Powered by Deep Web Technologies
Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Amendment No.: 185. Renewed Facility Operating License  

E-Print Network (OSTI)

Brief description of amendment: The amendments revise the facility operating license to delete Section 2.G.1 of the Facility Operating License, which requires reporting of violations of the requirements in Section 2, items C(1), C(3) though (33), E, F, K, and L of the Facility Operating License. The proposed amendment would also delete Section 6.6 of the Technical Specifications (TSs) regarding reportable events. Section 6.6 of the TSs are redundant to requirements that have since been embodied in the regulations and, accordingly, may be deleted from the TS.

Virgil C. Summer Nuclear Station

2011-01-01T23:59:59.000Z

2

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission (NRC) today delivered to Congress the Next Generation Nuclear Plant (NGNP) Licensing Strategy Report which describes the licensing approach, the analytical tools, the research and development activities and the estimated resources required to license an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process heat for any number of industrial applications including electricity production, hydrogen production, coal-to-liquids, shale oil

3

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear Plant August 15, 2008 - 3:15pm Addthis WASHINGTON, DC -The U.S. Department of Energy (DOE) and the U.S. Nuclear Regulatory Commission (NRC) today delivered to Congress the Next Generation Nuclear Plant (NGNP) Licensing Strategy Report which describes the licensing approach, the analytical tools, the research and development activities and the estimated resources required to license an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process heat for any number of industrial applications including electricity production, hydrogen production, coal-to-liquids, shale oil

4

Idaho National Engineering and Environmental Laboratory Licensing Qualification Issues  

E-Print Network (OSTI)

Idaho National Engineering and Environmental Laboratory Licensing Qualification Issues Subcommittee Meeting Oct. 28, 2002 Livermore, CA #12;Idaho National Engineering and Environmental Laboratory · Approach to Regulatory Approval · Nuclear Design Codes · Summary #12;Idaho National Engineering

5

Combined Operating License Model Program Plan  

Science Conference Proceedings (OSTI)

The Model Program Plan (MPP) provides functional guidance on how to prepare a Combined Operating License (COL) application for a new nuclear power facility when incorporating previous findings from both design certification (DC) and an early site permit (ESP) proceedings. The plan identifies the activities necessary to prepare an application and provides guidance on planning and managing a COL program, including working with DC and ESP holders and using subcontracted resources to develop necessary new in...

2003-11-17T23:59:59.000Z

6

Cogeneration Operational Issues  

E-Print Network (OSTI)

A great deal of the discussions concerning congeneration projects are focused on the "avoided cost" and other legal issues which effect these projects. These areas are extremely important and are essential to the success of the venture. Equally important, however, are the operational Issues which impact the utility and the cogenerator. This paper addresses the utility perspective in regard to possible impact of cogeneration systems on utility service to other customer, safety and substation operations. Other operational issues also include utility transmission planning, generation planning and fuel mix decisions. All of these operational problems have an impact on the ratepayer in regard to quality of electric service and future rates. Both the cogenerator and the utility have an interest in solving these problems.

Williams, M.

1985-05-01T23:59:59.000Z

7

Combined Construction and Operating License (COL)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Updates available at: http://www.nuclear.gov NEXT UPDATE - April 2013 Page 1 News Updates  On October 22 Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013.  On November 20, 2012, the Department of Energy announced that it had selected the Generation mPower team as a recipient for Government cost-shared funding as part of its Small Modular Reactor Licensing Technical Support program. The Department also announced plans to issue a

8

Non-Power Reactor Operator Licensing Examiner Standards. Revision 1  

SciTech Connect

The Non-Power Reactor Operator Licensing Examiner Standards provide policy and guidance to NRC examiners and establish the procedures and practices for examining and licensing of applicants for NRC operator licenses pursuant to Part 55 of Title 10 of the Code of Federal Regulations (10 CFR 55). They are intended to assist NRC examiners and facility licensees to understand the examination process better and to provide for equitable and consistent administration of examinations to all applicants by NRC examiners. These standards are not a substitute for the operator licensing regulations and are subject to revision or other internal operator examination licensing policy changes. As appropriate, these standards will be revised periodically to accommodate comments and reflect new information or experience.

NONE

1995-06-01T23:59:59.000Z

9

Key Issues for the Safety and Licensing of Fusion  

SciTech Connect

Studies of the safety and environmental impacts of fusion, both of future power plants and of ITER, have shown that a good performance can be achieved. Although it is difficult to anticipate the regulatory regime in which future fusion power stations will be licensed, the areas of public and occupational safety and short and long-term environmental impact are likely to remain important. In each of these areas, the outcome of various studies have been reviewed, leading to a list of issues which should be given attention to facilitate eventual licensing of a fusion power plant. Many of these relate to reducing conservatisms and uncertainties in the analyses, but also included are improved understanding of tritium retention and of dust generation, and development of materials to provide long component lifetimes. A full appraisal is also recommended of the viability of recycling of active materials after end of plant life.

Taylor, Neill P. [Culham Science Centre (United Kingdom)

2005-05-15T23:59:59.000Z

10

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power 2010 Program: Combined Construction and Operating Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

11

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power 2010 Program: Combined Construction and Operating Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

12

Interim On-Site Storage of Low Level Waste: Volume 1: Licensing and Regulatory Issues  

Science Conference Proceedings (OSTI)

This report is an all-inclusive resource guide for evaluating a utility's on-site storage licensing requirements. Specifically, the report offers an extensive review of licensing and regulatory documents related to on-site storage of low level waste as well as a methodology for evaluating on-site storage licensing issues.

1992-06-01T23:59:59.000Z

13

Executive Director for Operations RENEWAL OF FULL-POWER OPERATING LICENSE FOR PILGRIM NUCLEAR POWER STATION  

E-Print Network (OSTI)

This paper (1) requests that the Commission authorize the Director of the Office of Nuclear Reactor Regulation (NRR) to renew the operating license for Pilgrim Nuclear Power Station (PNPS) for an additional 20 years, and (2) informs the Commission of the results of the U.S. Nuclear Regulatory Commission (NRC) staffs review of the PNPS license renewal application (LRA) (Ref. 1) submitted by Entergy Nuclear Generation Company (Entergy Nuclear) and Entergy Nuclear Operations, Inc. (ENO) (owner and operator, respectively, of PNPS). In the Staff Requirements Memorandum for SECY-02-0088, Turkey Point Nuclear Plant, Units 3 and

R. W. Borchardt

2012-01-01T23:59:59.000Z

14

Licensing an assured isolation facility for low-level radioactive waste. Volume 1: Licensing strategy and issues  

Science Conference Proceedings (OSTI)

This report provides a detailed set of proposed criteria and guidance for the preparation of a license application for an assured isolation facility (AIF). The report is intended to provide a detailed planning basis upon which a prospective applicant may begin pre-licensing discussions with the Nuclear Regulatory Commission and initiate development of a license application. The report may also be useful to the NRC or to state regulatory agencies that may be asked to review such an application. Volume 1 of this report provides background information, and describes the licensing approach and methodology. Volume 2 identifies specific information that is recommended for inclusion in a license application.

Silverman, D.J.; Bauser, M.A. [Morgan, Lewis and Bockius, Washington, DC (United States); Baird, R.D. [Rogers and Associates Engineering Corp., Salt Lake City, UT (United States)

1998-07-01T23:59:59.000Z

15

Licensing NIST Technologies  

Science Conference Proceedings (OSTI)

... Partnerships Office (TPO) works with partners to license NIST patented inventions. Parties interested in licensing an issued patent or patent ...

2013-04-08T23:59:59.000Z

16

NRC Regulatory Issue Summary on EPRI Digital Licensing Guideline, TR-102348 (NEI 01-01)  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission (NRC) issued this regulatory issue summary (RIS) to announce that the NRC has reviewed the EPRI / Nuclear Energy Institute (NEI) Joint Task Force Report entitled "Guideline on Licensing Digital Upgrades: EPRI TR-102348, Revision 1, NEI 01-01: A Revision of EPRI TR-102348 To Reflect Changes to the 10 CFR 50.59 Rule," and has endorsed the report for use as guidance in designing and implementing digital upgrades to instrumentation and control systems. The attached safe...

2004-01-16T23:59:59.000Z

17

Licensing of spent fuel dry storage and consolidated rod storage: A Review of Issues and Experiences  

Science Conference Proceedings (OSTI)

The results of this study, performed by Pacific Northwest Laboratory (PNL) and sponsored by the US Department of Energy (DOE), respond to the nuclear industry's recommendation that a report be prepared that collects and describes the licensing issues (and their resolutions) that confront a new applicant requesting approval from the US Nuclear Regulatory Commission (NRC) for dry storage of spent fuel or for large-scale storage of consolidated spent fuel rods in pools. The issues are identified in comments, questions, and requests from the NRC during its review of applicants' submittals. Included in the report are discussions of (1) the 18 topical reports on cask and module designs for dry storage fuel that have been submitted to the NRC, (2) the three license applications for dry storage of spent fuel at independent spent fuel storage installations (ISFSIs) that have been submitted to the NRC, and (3) the three applications (one of which was later withdrawn) for large-scale storage of consolidated fuel rods in existing spent fuel storage pools at reactors that were submitted tot he NRC. For each of the applications submitted, examples of some of the issues (and suggestions for their resolutions) are described. The issues and their resolutions are also covered in detail in an example in each of the three subject areas: (1) the application for the CASTOR V/21 dry spent fuel storage cask, (2) the application for the ISFSI for dry storage of spent fuel at Surry, and (3) the application for full-scale wet storage of consolidated spent fuel at Millstone-2. The conclusions in the report include examples of major issues that applicants have encountered. Recommendations for future applicants to follow are listed. 401 refs., 26 tabs.

Bailey, W.J.

1990-02-01T23:59:59.000Z

18

Licensed operating reactors: Status summary report, data as of December 31, 1995. Volume 20  

Science Conference Proceedings (OSTI)

The US Nuclear Regulatory Commission`s monthly summary of licensed nuclear power reactor data is based primarily on the operating data report submitted by licensees for each unit. This report is divided into two sections: the first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 availability factors, capacity factors, and forced outage rates are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensees and notes to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1996-06-01T23:59:59.000Z

19

Reference: Additional Radiation Dose Information Supporting the License Amendment Request to Permit Uprated Power Operation  

E-Print Network (OSTI)

In the referenced letter, Commonwealth Edison Company, now Exelon Generation Company (EGC), LLC, submitted a request for changes to the operating licenses and Technical Specifications for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2, to allow operation with an extended power uprate. In an August 7, 2001, teleconference between representatives of EGC and Mr. L. W. Rossbach and other members of the NRC, the NRC requested additional information regarding these proposed changes. The attachment to this letter provides the requested information. Should you have any questions concerning this letter, please contact Mr. A. R. Haeger at (630) 657-2807.

Exelon Genetation; K. A. Ainger

2001-01-01T23:59:59.000Z

20

License Agreements  

Science Conference Proceedings (OSTI)

Standard Reference Database NIST 23 REFPROP License Information. Single Location License. A single location license ...

2013-05-06T23:59:59.000Z

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Licensed operating reactors: Status summary report data as of December 31, 1991. Volume 16  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1991) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1992-03-01T23:59:59.000Z

22

Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

NONE

1995-04-01T23:59:59.000Z

23

Licensed operating reactors. Status summary report data as of December 31, 1993  

SciTech Connect

The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

Hartfield, R.A.

1994-03-01T23:59:59.000Z

24

for Renewal of Operating Licenses for Nuclear Power Plants. " The staff determined that the  

E-Print Network (OSTI)

LRA was complete and acceptable for docketing on May 15, 2009 (74 FR 22978). The staff has reviewed the PVNGS LRA, conducted site audits, issued requests for additional information (RAls), reviewed the applicant's responses to the staffs RAls, developed its "Safety Evaluation Report with Open Item Related to the License Renewal of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 " (SER with Open Item), and reviewed the applicant's comments on the SER with Open Item. The SER with Open Item was discussed at an Advisory Committee on Reactor Safeguards (ACRS) subcommittee meeting on September 8,2010. The staff has closed the open item discussed in the SER with Open Item. Section 1.5 of the attached "Safety Evaluation Report Related to the License Renewal of the Palo Verde Nuclear Generating Station, Units 1, 2, and 3 " (SER), provides a summary of the open item including actions to close the item. On the basis of this review, the staff has developed the enclosed SER to document its findings associated with the safety review of the LRA and supporting documentation. This SER is scheduled to be discussed at the ACRS full committee meeting on

United States; Mr. Randall; K. Edington

2011-01-01T23:59:59.000Z

25

Operational Issues at the Environmental Restoration Disposal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ERDF is operated by Stoller Corporation (Stoller) under subcontract to Washington Closure Hanford (WCH). Currently, six disposal cells comprise the ERDF, with four more...

26

LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM  

NLE Websites -- All DOE Office Websites (Extended Search)

LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM LOS ALAMOS NATIONAL LABORATORY - EXPRESS LICENSING PROGRAM NON-EXCLUSIVE PATENT LICENSE AGREEMENT This Agreement between Los Alamos National Security, LLC ("LANS"), under its United States Department of Energy ("DOE") Contract No. DE-AC52-06NA25396, to manage and operate Los Alamos National Laboratory ("LANL"), and ______________________________________, a _____________________________ corporation Company Name ("LICENSEE") (State of Incorporation) having its principal place of business at: ________________________________________________________________________________________ (Company Address) is effective on the date of execution by the last signing Party and payment of the License Issue Fee

27

Licensing issues associated with the use of mixed-oxide fuel in US commercial nuclear reactors  

Science Conference Proceedings (OSTI)

On January 14, 1997, the Department of Energy, as part of its Record of Decision on the storage and disposition of surplus nuclear weapons materials, committed to pursue the use of excess weapons-usable plutonium in the fabrication of mixed-oxide (MOX) fuel for consumption in existing commercial nuclear power plants. Domestic use of MOX fuel has been deferred since the late 1970s, principally due to nuclear proliferation concerns. This report documents a review of past and present literature (i.e., correspondence, reports, etc.) on the domestic use of MOX fuel and provides discussion on the technical and regulatory issues that must be addressed by DOE (and the utility/consortia selected by DOE to effect the MOX fuel consumption strategy) in obtaining approval from the Nuclear Regulatory Commission to use MOX fuel in one or a group of existing commercial nuclear power plants.

Williams, D.L. Jr.

1997-04-01T23:59:59.000Z

28

BURNER DEVELOPMENT AND OPERABILITY ISSUES ASSOCIATED WITH STEADY FLOWING SYNGAS  

E-Print Network (OSTI)

BURNER DEVELOPMENT AND OPERABILITY ISSUES ASSOCIATED WITH STEADY FLOWING SYNGAS FIRED COMBUSTORS-Mu¨nchen, Garching, Germany This article addresses the impact of syngas fuel composition on combustor blowout, flash flashback mechanisms are present in swirling flows, and the key thermophysical properties of a syngas

Lieuwen, Timothy C.

29

Related to the License Renewal  

E-Print Network (OSTI)

requested that the U.S. Nuclear Regulatory Commission (NRC) renew the operating license for Ginna (license number DPR-18) for a period of 20 years beyond the current expiration of midnight, September 18, 2009. The Ginna plant is located in the Town of Ontario, in the northwest corner of Wayne County, New York, on the south shore of Lake Ontario. The NRC issued the construction permit in April 1966, followed by a provisional operating license on September 19, 1969, and a full-term operating license on December 10, 1984. The Ginna unit consists of a Westinghouse pressurized-water reactor with nuclear steam supply systems designed to operate at core power levels up to 1,520 megawatts-thermal, or approximately 490 megawatts-electric. This SER presents the status of the staffs review of information submitted to the NRC through January 9, 2004. In its SER with open items, issued on October 9, 2003, the staff identified open and confirmatory items that required resolution before the staff could make a final determination on the application. These items are summarized in Sections 1.5 and 1.6 of this

R. E. Ginna; Nuclear Power Plant; R. E. Ginna; Nuclear Power Plant

2004-01-01T23:59:59.000Z

30

Atomic Safety and Licensing Board Panel annual report, Fiscal year 1992  

SciTech Connect

In Fiscal Year 1992, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 38 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license from the Nuclear Regulatory Commission. This reports sets out the Panel`s caseload during the year and summarizes, highlights, and analyzes how the wide-ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

Not Available

1993-09-01T23:59:59.000Z

31

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Water Heating Program Info State Florida Program Type Solar/Wind Contractor Licensing Provider Florida Solar Energy Industries Association Until 1994, Florida offered limited specialty licenses for residential solar hot water and pool heating, as well a general solar contractor's license. These specialty licenses have not been issued since that time, although people holding these licenses may renew them. The new solar contractor license defines a broader scope of work. With the new license, solar contractors have the authority to install, maintain and

32

NETL: Investigation on Flame Characteristics and Burner Operability Issues  

NLE Websites -- All DOE Office Websites (Extended Search)

Investigation on Flame Characteristics and Burner Operability Issues of Oxy-Fuel Combustion Investigation on Flame Characteristics and Burner Operability Issues of Oxy-Fuel Combustion Project No.: DE-FE0002402 NETL has partnered with the University of Texas at El Paso (UTEP) to investigate the characteristics of oxy-fuel flames and assess their impact on the operability of oxy-fuel combustion systems. The examination of fundamental flame characteristics data and related burner operability parameters are essential for designing and developing oxy-fuel combustion systems for new power plants and retrofitting existing power generation units. In an oxy-fuel system, coal is combusted in an enriched oxygen environment using pure oxygen diluted with recycled CO2 or water vapor (H2O), resulting in a flue stream consisting only of CO2 and H2O (no other co-contaminants) (Figure 1). Oxy-fuel combustion is promising for CCUS applications because water can be condensed out of the CO2/H2O flue stream to produce a relatively pure CO2 end product for capture. Oxy-fuel combustion and subsequent CO2 capture is currently being considered by the DOE's Innovations for Existing Plants Program as having the potential to meet the goal of 90 percent CO2 capture without increasing the cost of electricity more than 35 percent.

33

Operational Issues at the Environmental Restoration Disposal Facility at Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hanford Operations Hanford Operations Evaluating Operational Issues at the Environmental Restoration Disposal Facility at Hanford By Craig H. Benson, PhD, PE; William H. Albright, PhD; and David P. Ray, PE Sponsored by: The Office of Engineering and Technology (EM-20) 17 June 2007 i TABLE OF CONTENTS EXECUTIVE SUMMARY ii ACKNOWLEDGEMENTS iv INTRODUCTION 1 BACKGROUND 1 Environmental Restoration Disposal Facility 1 Source of Concern 2 LINES OF INQUIRY 2 1. Validate Scope of Identified Problems 2 2. Assess Contractor Evaluation of the Elevated Leachate Level on the Landfill Liner 3 3. Evaluate Adequacy of Landfill Performance in View of the Discovered Falsified Compaction Data and Potential Leachate Level Problems 4

34

Long-term safety issues associated with mixer pump operation  

SciTech Connect

In this report, we examine several long-term issues: the effect of pump operation on future gas release events (GREs), uncontrolled chemical reactions, chronic toxic gas releases, foaming, and erosion and corrosion. Heat load in excess of the design limit, uncontrolled chemical reactions, chronic toxic gas releases, foaming, and erosion and corrosion have been shown not to be safety concerns. The effect of pump operation on future GREs could not be quantified. The problem with evaluating the long-term effects of pump operation on GREs is a lack of knowledge and uncertainty. In particular, the phenomena governing gas retention, particle size distribution, and settling are not well understood, nor are the interactions among these factors understood. There is a possibility that changes in these factors could increase the size of future GREs. Bounding estimates of the potential increase in size of GREs are not possible because of a lack of engineering data. Proper management of the hazards can reduce, but not eliminate, the possibility of undesirable changes. Maintaining temperature within the historical limits can reduce the possibility of undesirable changes. A monitoring program to detect changes in the gas composition and crust thickness will help detect slowly occurring changes. Because pump operation has be shown to eliminate GREs, continued pump operation can eliminate the hazards associated with future GREs.

Kubic, W.L. Jr.

1994-12-31T23:59:59.000Z

35

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

and operate Lawrence Livermore National Laboratory ... which may be useful for human health treatment ... Licensed Service means the use of Licensed ...

36

Nuclear Power 2010 Program Lessons Learned Report on the Combined Construction and Operating License/Design Certification Demonstration Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power 2010 Program Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report August 30, 2012 Prepared by Longenecker and Associates DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not

37

Executive Director for Operations STATUS OF EFFORTS TO FINALIZE REGULATIONS FOR RADIOLOGICAL CRITERIA FOR LICENSE TERMINATION:URANIUM RECOVERY FACILITIES  

E-Print Network (OSTI)

This paper provides information to the Commission and requests approval by negative consent of the staff's proposed alternative for proceeding with final rulemaking to amend criterion 6 of 10 CFR Part 40, Appendix A in order to provide radiological criteria for termination of uranium recovery licenses. SUMMARY: In a Staff Requirements Memorandum (SRM) on SECY-97-046A, dated May 21, 1997, the Commission instructed staff to develop a rule that addresses radiological criteria (decommissioning land and buildings) for license termination for uranium recovery facilities, i.e., uranium mills and in-situ leach facilities (ISLs), on an expedited basis. The staff has requested additional public comment on this issue, and is preparing a final rule for Commission approval. If the Commission approves the staff's recommended approach, the final rulemaking package will be forwarded to the Commission within 5 months after receiving approval. If the Commission selects an alternative approach, an additional opportunity for public comment may be necessary. A discussion of the alternatives considered is in Attachment 1. Attachment 2 is a differing viewpoint (as allowed under Office of Nuclear Material Safety and Safeguards Policy and Procedures Letter 1-8, Revision 4, December 1996) on the approach delineated in this Commission Paper, submitted by a staff member on April 8, 1998. A differing viewpoint is an allowed alternative to a Differing Professional View (DPV) or a Differing Professional Opinion (DPO). This alternative allows employees to document their differing professional views and attach these views to proposed staff positions or other documents, to be forwarded as the document moves through the management chain. Attachment 3 contains the dose modeling assumptions and results that support the staff's recommended approach. CONTACT:

L. Joseph Callan /s; Elaine Brummett Nmss/dwm

1998-01-01T23:59:59.000Z

38

Research License Agreement Template  

NLE Websites -- All DOE Office Websites (Extended Search)

Research License Template Research License Template RESEARCH LICENSE Between Alliance for Sustainable Energy, LLC And [COMPANY or UNIVERSITY NAME] This License Agreement (hereinafter "Agreement"), which shall be effective on the date it is executed by the last Party to sign (the "Effective Date"), is between Alliance for Sustainable Energy, LLC (hereinafter "Alliance"), Management and Operating Contractor for the National Renewable Energy Laboratory (hereinafter "NREL") located at 1617 Cole Blvd., Golden, Colorado 80401 and [COMPANY or UNIVERSITY NAME], (hereinafter "Research Licensee"), a [FOR-PROFIT or NON-PROFIT] entity organized and existing under the laws of the State of [NAME of STATE] and having a principal place of business at [ADDRESS], hereinafter referred

39

Email licensing  

Science Conference Proceedings (OSTI)

We propose a framework, email licensing, that allows email users to determine whose messages and in what content and conditions are authorized to come into their inboxes. The idea is to treat email address as a data owned by the addressee, and any use ... Keywords: Email licensing, Personal data licensing, Spam, Unsolicited emails

Yuh-Jzer Joung; Chu-Jui Yang

2009-05-01T23:59:59.000Z

40

Occupational Risk Consequences of the Department of Energy's Approach to Repository Design, Performance Assessment, and Operation in the Yucca Mountain License Application  

Science Conference Proceedings (OSTI)

EPRI has discovered several aspects of the U.S Department of Energy (DOE) proposed design and operation of the Yucca Mountain repository thatif implemented as described in the license application (LA)could result in unnecessary occupational health and safety risk to workers involved with repository-related activities. This report identifies key DOE conservatisms and focuses on the occupational risk consequences of the DOE's approach to the repository design, performance assessment, and operation.

2008-08-12T23:59:59.000Z

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Maintenance Issues Related to Operation of HTLS Conductors  

Science Conference Proceedings (OSTI)

The new High-Temperature Low-Sag conductors (HTLS) are used to raise current capacity of an existing transmission line. As the use of these conductors increases, it is crucial to address some of the outstanding issues that arise with these conductors. One such issue, as revealed during a field demonstration carried out by EPRI to gain experience on the design and handling of this type of conductors, is conductor maintenance. HTLS conductors are more complex than conventional Aluminum Conductor Steel Rein...

2008-12-02T23:59:59.000Z

42

Negotiable Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Negotiable Licensing Negotiable Licensing Negotiable Licenses LANL's significant portfolio of intellectual property (patents, copyrights, and trademarks) primarily results from federally-sponsored research and development in support of the Laboratory's national security mission. Also, we collaborate with industry to develop innovative, application-specific technology to further our partner's ultimate commercialization objectives. In each case, we develop valuable technology that provides benefit to both the public and private sectors, the majority of which is available for commercial licensing. To ensure that our partners have the necessary intellectual property advantage to successfully deploy LANL technology, we offer a variety of negotiable commercial license agreements that can be tailored to suit specific market

43

Life-Limiting Issues for Long-Term Operation of Nuclear Power Plants  

Science Conference Proceedings (OSTI)

This report identifies and investigates issues that can be life-limiting for nuclear power plants operating beyond 60 years. It also provides a foundation and basis for evaluating life-limiting conditions and events that might challenge long-term operations. The report addresses these questions: Are there any showstoppers that will prevent plants from operating beyond 60 years? If so, what are those issues? How should these issues be managed?

2010-11-30T23:59:59.000Z

44

TAO: License  

NLE Websites -- All DOE Office Websites (Extended Search)

Copyright 2013 , UChicago Argonne, LLC Copyright 2013 , UChicago Argonne, LLC Operator of Argonne National Laboratory All rights reserved. Toolkit for Advanced Optimization (TAO), Version 2.2.0 OPEN SOURCE LICENSE Redistribution and use in source and binary forms, with or without modification, are permitted provided that the following conditions are met: Redistributions of source code must retain the above copyright notice, this list of conditions and the following disclaimer. Software changes, modifications, or derivative works, should be noted with comments and the author and organization's name. Redistributions in binary form must reproduce the above copyright notice, this list of conditions and the following disclaimer in the documentation and/or other materials provided with the distribution.

45

Investigation of several critical issues in screen mesh heat pipe manufacturing and operation.  

E-Print Network (OSTI)

??The PhD thesis with the title Investigation of several critical issues in screen mesh heat pipe manufacturing and operation presented hereafter describes work carried out (more)

Engelhardt, Andreas

2010-01-01T23:59:59.000Z

46

Energy Department Issues Draft Request for Proposals for Operation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

full and open basis to manage and operate DOE's Pacific Northwest National Laboratory (PNNL). PNNL is a world-class multi-program national laboratory located in Richland,...

47

DOE?s Idaho Operations Office Issues 2011-Beyond Strategic...  

NLE Websites -- All DOE Office Websites (Extended Search)

of the Department of Energys Idaho Operations Office (DOE-ID) FY 2011 and Beyond Strategic Plan. This plan ensures flow-down and alignment of national objectives to our...

48

Atomic Safety and Licensing Board Panel Biennial Report, Fiscal Years 1993--1994. Volume 6  

SciTech Connect

In Fiscal Year 1993, the Atomic Safety and Licensing Board Panel (``the Panel``) handled 30 proceedings. In Fiscal Year 1994, the Panel handled 36 proceedings. The cases addressed issues in the construction, operation, and maintenance of commercial nuclear power reactors and other activities requiring a license form the Nuclear Regulatory Commission. This report sets out the Panel`s caseload during the year and summarizes, highlight, and analyzes how the wide- ranging issues raised in those proceedings were addressed by the Panel`s judges and licensing boards.

NONE

1995-08-01T23:59:59.000Z

49

Audit Report, MANAGEMENT OF PATENT AND LICENSING ACTIVITIES AT...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report, MANAGEMENT OF PATENT AND LICENSING ACTIVITIES AT DEPARTMENT-OWNED CONTRACTOR-OPERATED LABORATORIES, DOEIG-0479 Audit Report, MANAGEMENT OF PATENT AND LICENSING ACTIVITIES...

50

Reference: Additional Plant Systems Information Supporting the License Amendment Request to Permit Uprated Power Operation, Dresden Nuclear Power Station and Quad Cities Nuclear Power Station  

E-Print Network (OSTI)

2000 In the referenced letter, Commonwealth Edison Company, now Exelon Generation Company (EGC), LLC, submitted a request for changes to the operating licenses and Technical Specifications (TS) for Dresden Nuclear Power Station, Units 2 and 3, and Quad Cities Nuclear Power Station, Units 1 and 2, to allow operation at uprated power levels. In a telephone conference on August 31, 2001, between representatives of EGC and Mr. L. W. Rossbach and other members of the NRC, the NRC requested additional information regarding these proposed changes. The attachment to this letter provides the requested information. Should you have any questions related to this letter, please contact Mr. Allan R. Haeger

K. A. Ainger

2001-01-01T23:59:59.000Z

51

Cyclic Operation of Power Plant: Technical, Operational and Cost Issues -- An International Seminar: Proceedings: ''Two Shifting'' Seminar  

SciTech Connect

Because of changes in demand and competition within the power industry, fossil fuel plants in many countries are now subject to two-shift operation, that is, generating power for 10-15 hours during the day only, usually in combination with a complete shutdown on weekends. Other fossil-fueled units, although running around the clock, need to follow changes in electricity demand. This mode of functioning, in which temperatures and pressures are never stable for more than a few hours, is referred to as ''cyclic operation of plant.'' The aim of the seminar at which these papers were presented was to identify the basic causes of component and equipment problems in two-shift operation, and to begin to identify procedures that could minimize operating and maintenance costs. The papers cover the following topics: Session 1: Plant Operation Experience and Design Issues; Session 2: Materials Issues; Session 3: Cost, Manpower and Management Issues; Session 4: Plant Automation Issues; Session 5: Hot Section Gas Turbine Issues; and Session 6: HRSG [heat recovery steam generator] Issues.

None

2001-01-01T23:59:59.000Z

52

Energy Department Issues Draft Request for Proposals for Operation of its  

NLE Websites -- All DOE Office Websites (Extended Search)

Issues Draft Request for Proposals for Operation of its Pacific Issues Draft Request for Proposals for Operation of its Pacific Northwest National Laboratory in Washington News Featured Articles Science Headlines 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Presentations & Testimony News Archives Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 10.25.07 Energy Department Issues Draft Request for Proposals for Operation of its Pacific Northwest National Laboratory in Washington Print Text Size: A A A Subscribe FeedbackShare Page WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued a draft Request for Proposals (RFP) for prospective contractors who are interested in competing on a full and open basis to manage and operate DOE's Pacific

53

NREL: Technology Transfer - Technologies Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies Available for Licensing Technologies Available for Licensing Photo of NREL scientist in the NREL Hydrogen Lab. NREL's scientists and engineers develop award-winning technologies available for licensing. NREL scientists and engineers produce breakthrough and award-winning renewable energy and energy efficiency technologies that are available for licensing. We have many licensing opportunities for NREL-developed technologies, including our featured LED technologies. To see all our technologies available for licensing, visit the EERE Innovation Portal and search for NREL. Learn about our licensing agreement process. Contact For more information about licensing NREL-developed technologies, contact Eric Payne, 303-275-3166. Ombuds NREL strives to quickly resolve any issue or concern you may have regarding

54

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Request for Proposals Seeking a Contractor to Manage and DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory July 10, 2006 - 2:57pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximately $1.58 billion, five-year management and operating contract for Fermi National Accelerator Laboratory (Fermilab). Fermilab is a major DOE Office of Science single program research facility located on 6,800 acres approximately 45 miles west of Chicago, Illinois. "Fermilab is a world leader in high energy physics, which helps the U.S.

55

Managing license compliance in free and open source software development  

Science Conference Proceedings (OSTI)

License compliance in Free and Open Source Software development is a significant issue today and organizations using free and open source software are predominately focusing on this issue. The non-compliance to licenses in free and open source software ... Keywords: Compatibility analysis, Compliance management, Free and open source software, License compliance, Rights expression languages

G. R. Gangadharan; Vincenzo D'Andrea; Stefano Paoli; Michael Weiss

2012-04-01T23:59:59.000Z

56

Energy Department Issues Draft Request for Proposals for Operation of its  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Request for Proposals for Operation Draft Request for Proposals for Operation of its Pacific Northwest National Laboratory in Washington Energy Department Issues Draft Request for Proposals for Operation of its Pacific Northwest National Laboratory in Washington October 25, 2007 - 3:45pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued a draft Request for Proposals (RFP) for prospective contractors who are interested in competing on a full and open basis to manage and operate DOE's Pacific Northwest National Laboratory (PNNL). PNNL is a world-class multi-program national laboratory located in Richland, Washington, whose mission is to deliver science-based solutions for the nation's energy, environmental, and security needs. The draft RFP's Statement of Work highlights the type of work being

57

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Request for Proposals Seeking a Contractor to Manage and Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a contractor to manage and operate Princeton Plasma Physics Laboratory (PPPL), a DOE Office of Science research facility in Princeton, NJ. PPPL receives approximately $78 million annually from DOE. This is the first competition for a contractor in the history of the laboratory. The RFP describes the criteria DOE will use in selecting a successful future management and operating (M&O) contractor. Key criteria include:

58

Licensing Opportunity Announcements | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Technology Licensing | Licensing Opportunity Announcements SHARE Licensing Opportunity Announcements UT-Battelle, LLC, acting under its Prime Contract No. ORNL Laboratory Director Signs New License Agreement DE-AC05-00OR22725 with the U.S. Department of Energy (DOE) for the management and operation of the Oak Ridge National Laboratory (ORNL), is posting notice of near-term license opportunities for technologies listed on this page and is requesting license applications from potential commercialization partners. ORNL will license these technologies in defined fields of use. License applications will be evaluated based on prospective partners' ability and commitment to successfully commercialize the technology, with a preference for United States-based

59

Licensing - Oak Ridge National Laboratory | ORNL  

Licensing Things You Should Know about Working with ORNL. UT-Battelle manages and operates ORNL under a contract with the U.S. Department of Energy (DOE).

60

Final Safety Evaluation Report to license the construction and operation of a facility to receive, store, and dispose of 11e.(2) byproduct material near Clive, Utah (Docket No. 40-8989)  

Science Conference Proceedings (OSTI)

The Final Safety Evaluation Report (FSER) summarizes the US Nuclear Regulatory Commission (NRC) staff`s review of Envirocare of Utah, Inc.`s (Envirocare`s) application for a license to receive, store, and dispose of uranium and thorium byproduct material (as defined in Section 11e.(2) of the Atomic Energy Act of 1954, as amended) at a site near Clive, Utah. Envirocare proposes to dispose of high-volume, low-activity Section 11e.(2) byproduct material in separate earthen disposal cells on a site where the applicant currently disposes of naturally occurring radioactive material (NORM), low-level waste, and mixed waste under license by the Utah Department of Environmental Quality. The NRC staff review of the December 23, 1991, license application, as revised by page changes dated July 2 and August 10, 1992, April 5, 7, and 10, 1993, and May 3, 6, 7, 11, and 21, 1993, has identified open issues in geotechnical engineering, water resources protection, radon attenuation, financial assurance, and radiological safety. The NRC will not issue a license for the proposed action until Envirocare adequately resolves these open issues.

Not Available

1994-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

U.S. Material Licenses  

E-Print Network (OSTI)

There are approximately 22,400 licenses issued for medical, academic, industrial, and general uses of radioactive materials in the United States. The United States Nuclear Regulatory Commission (NRC) and State radiation safety regulatory programs are responsible for ensuring protection of public health and safety and the environment. Currently, there are approximately 3,450 licenses issued by the NRC and 18,950 licenses issued by the 36 Agreement States. An Agreement State is any state with which the Atomic Energy Commission or the Nuclear Regulatory Commission has entered into an Agreement under subsection 274b of the Atomic Energy Act of 1954 (as amended). Definition of the National Materials Program The National Materials Program (NMP) is a term that has been used for many years, to define the broad collective framework within which both NRC and the Agreement States function in carrying out their respective radiation safety regulatory programs. This framework also includes

unknown authors

2009-01-01T23:59:59.000Z

62

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

its Ames Laboratory its Ames Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Ames Laboratory June 29, 2006 - 2:48pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor to operate Ames Laboratory, a DOE Office of Science (SC) research facility in Ames, Iowa. This competition for a contractor is the first in the history of the laboratory. Ames is a laboratory that has been funded at approximately $30 million annually by the Office of Science, other government agencies, and private industry. "Ames Laboratory provides leadership in basic research across a broad spectrum of science, with great expertise in biology, chemistry, physics

63

State of California BOARD OF EQUALIZATION CIGARETTE AND TOBACCO PRODUCTS LICENSING ACT REGULATIONS  

E-Print Network (OSTI)

A new license shall not be issued to an applicant when any of the following apply: (1) a license subject to civil or criminal citation has been issued for the same location; (2) a license for the same location is suspended; (3) a license for the same location has been revoked any time within the preceding five years; or (4) any person

Regulation Denial; Of License

2006-01-01T23:59:59.000Z

64

Issues Involving The OSI Concept of Operation For Noble Gas Radionuclide Detection  

Science Conference Proceedings (OSTI)

The development of a technically sound protocol for detecting the subsurface release of noble gas radionuclides is critical to the successful operation of an on site inspection (OSI) under the CTBT and has broad ramifications for all aspects of the OSI regime including the setting of specifications for both sampling and analysis equipment used during an OSI. With NA-24 support, we are investigating a variety of issues and concerns that have significant bearing on policy development and technical guidance regarding the detection of noble gases and the creation of a technically justifiable OSI concept of operation. The work at LLNL focuses on optimizing the ability to capture radioactive noble gases subject to the constraints of possible OSI scenarios. This focus results from recognizing the difficulty of detecting gas releases in geologic environments - a lesson we learned previously from the LLNL Non-Proliferation Experiment (NPE). Evaluation of a number of important noble gas detection issues, potentially affecting OSI policy, has awaited the US re-engagement with the OSI technical community. Thus, there have been numerous issues to address during the past 18 months. Most of our evaluations of a sampling or transport issue necessarily involve computer simulations. This is partly due to the lack of OSI-relevant field data, such as that provided by the NPE, and partly a result of the ability of LLNL computer-based models to test a range of geologic and atmospheric scenarios far beyond what could ever be studied in the field making this approach very highly cost effective. We review some highlights of the transport and sampling issues we have investigated during the past year. We complete the discussion of these issues with a description of a preliminary design for subsurface sampling that is intended to be a practical solution to most if not all the challenges addressed here.

Carrigan, C R; Sun, Y

2011-01-21T23:59:59.000Z

65

Science-Operational Metrics and Issues for the "Are We Alone?" Movement  

E-Print Network (OSTI)

A movement is underway to test the uniqueness of Earth. Sponsored primarily by NASA, it is enlisting talented researchers from many disciplines. It is conceiving new telescopes to discover and characterize other worlds like Earth around nearby stars and to obtain their spectra. The goal is to search for signs of biological activity and perhaps find other cradles of life. Most effort thus far has focused on the optics to make such observations feasible. Relatively little attention has been paid to science operations--the link between instrument and science. Because of the special challenges presented by extrasolar planets, science-operational issues may be limiting factors for the "Are We Alone?" (AWA) movement. Science-operational metrics can help compare the merits of direct and astrometric planet searches, and estimate the concatenated completeness of searching followed by spectroscopy. This completeness is the prime science metric of the AWA program. Therefore, the goals of this white paper are to present ...

Brown, Robert A

2009-01-01T23:59:59.000Z

66

Licensing Instructions  

Operated by Lawrence Livermore National Security, LLC, for the Department of Energy's National Nuclear Security Administration

67

City of Madison - Contractor Licensing (Wisconsin) | Open Energy...  

Open Energy Info (EERE)

the City of Madison has issued rules for contractor licensing and equipment standards for solar thermal installations. In the City's Heating, Ventilating and Air Conditioning Code...

68

City of Madison - Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the City of Madison has issued rules for contractor licensing and equipment standards for solar thermal installations. In the City's Heating, Ventilating and Air Conditioning Code...

69

Summary - Operational Issues at the Environmental Restoration Disposal Facility (ERDF) at Hanford  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ERDF ERDF ETR Report Date: June 2007 ETR-6 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Operational Issues at the Environmental Restoration Disposal Facility(ERDF) at Hanford Why DOE-EM Did This Review The ERDF is a large- scale disposal facility authorized to receive waste from Hanford cleanup activities. It contains double-lined cells with a RCRA Subtitle C- type liner and leachate collection system. By 2007, 6.8 million tons of waste with 39,000 Curies of radioactivity had been placed in the ERDF. In 2006, events occurred that affected the operation of the automatic leachate transfer pumps and a technician confessed to having not performed compaction tests and to falsification of the data.

70

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fermi National Accelerator Laboratory Fermi National Accelerator Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory July 10, 2006 - 2:57pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximately $1.58 billion, five-year management and operating contract for Fermi National Accelerator Laboratory (Fermilab). Fermilab is a major DOE Office of Science single program research facility located on 6,800 acres approximately 45 miles west of Chicago, Illinois. "Fermilab is a world leader in high energy physics, which helps the U.S. maintain global competitiveness," said Under Secretary for Science, Dr.

71

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Argonne National Laboratory Argonne National Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Argonne National Laboratory April 19, 2006 - 10:23am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximated $2.54 billion, five-year management and operating contract for Argonne National Laboratory (ANL), a DOE Office of Science multi-program research facility located near Chicago, Illinois. "Argonne lab contributes expert scientists and unique leadership in basic research, which helps the U.S. maintain our global competitiveness," said Office of Science Director, Dr. Raymond L. Orbach. "Through this contracting process, DOE seeks the best possible management of this

72

Yankee nuclear power station license renewal assessment  

Science Conference Proceedings (OSTI)

Nuclear power plants are initially licensed to operate for 40 years. Recent changes to US Nuclear Regulatory Commission regulations allow licenses to be renewed for up to 20 additional years. The new regulations require a comprehensive plant assessment to ensure continued effective aging management of equipment important to license renewal (ILR). Under the industry's lead plant program, Yankee Atomic Electric Company (YAEC) has assisted with development and demonstration of a generic license renewal assessment process. The generic assessment process developed under the lead plant program is the Nuclear Management and Resources Council methodology.

Hinkle, W.D. (Yankee Atomic Electric Co., Bolten, MA (United States))

1992-01-01T23:59:59.000Z

73

Technologies licensed | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Technologies licensed Technologies licensed Technologies licensed Posted: July 16, 2012 - 3:49pm | Y-12 Report | Volume 9, Issue 1 | 2012 Rendering of Y-12's Access Rate Control System Wherever threatening situations arise, in-place security measures make the most of every second. On Feb. 8, a startup firm in Knoxville, Tenn., licensed two security-related technologies from the Y-12 National Security Complex that do just that. The technologies, which delay entrance to controlled-access areas, provide a security solution for various potential markets: commercial nuclear facilities, pharmaceutical manufacturers, correctional facilities and large sporting venues, as well as for other Department of Energy sites. Sustainable Environment Technologies, LLC (SET), licensed the Access Rate

74

Solar Heating Contractor Licensing  

Energy.gov (U.S. Department of Energy (DOE))

Michigan offers a solar heating contractor specialty license to individuals who have at least three years of experience installing solar equipment under the direction of a licensed solar contractor...

75

Issue Paper Potential Water Availability Problems Associated with Geothermal Energy Operations  

DOE Green Energy (OSTI)

The report is the first to study and discuss the effect of water supply problems of geothermal development. Geothermal energy resources have the potential of making a significant contribution to the U.S. energy supply situation, especially at the regional and local levels where the resources are located. A significant issue of concern is the availability and cost of water for use in a geothermal power operation primarily because geothermal power plants require large quantities of water for cooling, sludge handling and the operation of environmental control systems. On a per unit basis, geothermal power plants, because of their inherent high heat rejection rates, have cooling requirements several times greater than the conventional fossil fuel plants and therefore the supply of water is a critical factor in the planning, designing, and siting of geothermal power plants. However, no studies have been specifically performed to identify the water requirements of geothermal power plants, the underlying causes of water availability problems, and available techniques to alleviate some of these problems. There is no cost data included in the report. The report includes some descriptions of known geothermal areas. [DJE-2005

None

1982-02-19T23:59:59.000Z

76

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

Science Conference Proceedings (OSTI)

California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

2008-07-01T23:59:59.000Z

77

Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2  

SciTech Connect

NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

1996-02-01T23:59:59.000Z

78

PCx END USER SOFTWARE LICENSE AGREEMENT  

PCx_lic.web.enduser. doc 7-19-06 1 PCx END USER SOFTWARE LICENSE AGREEMENT This Agreement, is made between the University of Chica go as operator of Argonne National ...

79

NREL: Technology Transfer - Licensing Agreements  

National Renewable Energy Laboratory Technology Transfer Licensing Agreements. Through licensing agreements, NREL provides industry with an opportunity to ...

80

Resolving issues at the Department of Energy/Oak Ridge Operations Facilities  

SciTech Connect

Waste management, like many other issues, has experienced major milestones. In 1971, the Calvert Cliff's decision resulted in an entirely different approach to the consideration of environmental impact analysis in reactor siting. The accidents at Three Mile Island and Chernobyl have had profound effects on nuclear power plant design. The high-level waste repository program has had many similar experiences that have modified the course of events. The management of radioactive, hazardous chemical and mixed waste in all of the facilities of the Oak Ridge Operations (ORO) Office of the Department of Energy (DOE) took on an entirely different meaning in 1984. On April 13, 1984, Federal Judge Robert Taylor said that DOE should proceed 'with all deliberate speed' to bring the Y-12 plant into compliance with the Resource Conservation and Recovery Act and the Clean Water Act. This decision resulted from a suit brought by the Legal Environmental Assistance Foundation (LEAF) and grew out of a continuing revelation of mercury spills and other problems related to the Oak Ridge plants of DOE. In this same time frame, other events occurred in Oak Ridge that would set the stage for major changes, to provide the supporting environment that allowed a very different and successful approach to resolving waste management issues at the DOE/ORO Facilities. This is the origin of the Oak Ridge Model which was recently adopted as the DOE Model. The concept is to assure that all stakeholders in waste management decisions have the opportunity to be participants from the first step. A discussion of many of the elements that have contributed to the success of the Model follows.

Row, T.H.; Adams, W.D.

1988-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Resolving issues at the Department of Energy/Oak Ridge Operations Facilities  

SciTech Connect

Waste management, like many other issues, has experienced major milestones. In 1971, the Calvert Cliff's decision resulted in an entirely different approach to the consideration of environmental impact analysis in reactor siting. The accidents at Three Mile Island and Chernobyl have had profound effects on nuclear power plant design. The high-level waste repository program has had many similar experiences that have modified the course of events. The management of radioactive, hazardous chemical and mixed waste in all of the facilities of the Oak Ridge Operations (ORO) Office of the Department of Energy (DOE) took on an entirely different meaning in 1984. On April 13, 1984, Federal Judge Robert Taylor said that DOE should proceed 'with all deliberate speed' to bring the Y-12 plant into compliance with the Resource Conservation and Recovery Act and the Clean Water Act. This decision resulted from a suit brought by the Legal Environmental Assistance Foundation (LEAF) and grew out of a continuing revelation of mercury spills and other problems related to the Oak Ridge plants of DOE. In this same time frame, other events occurred in Oak Ridge that would set the stage for major changes, to provide the supporting environment that allowed a very different and successful approach to resolving waste management issues at the DOE/ORO Facilities. This is the origin of the Oak Ridge Model which was recently adopted as the DOE Model. The concept is to assure that all stakeholders in waste management decisions have the opportunity to be participants from the first step. A discussion of many of the elements that have contributed to the success of the Model follows.

Row, T.H.; Adams, W.D.

1988-01-01T23:59:59.000Z

82

Chapter 5, "License Renewal and Aging Management for Continued Service  

SciTech Connect

As of August 2011, there were 104 commercial nuclear power reactors licensed to operate in 31 states in the United States. Initial operating licenses in the United States are granted for a period of 40 years. In order to help assure an adequate energy supply, the USNRC has established a timely license renewal process and clear requirements that are needed to ensure safe plant operation for an extended plant life. The principals of license renewal and the basic requirements that address license renewal are identified as well as additional sources of guidance that can be utilized as part of the license renewal process. Aging management program inspections and operating experience related to the concrete and steel containment structures are provided. Finally, several lessons learned are provided based on containment operating experience.

Naus, Dan J [ORNL] [ORNL

2013-01-01T23:59:59.000Z

83

NOTICE OF INTENT TO GRANT PARTIALLY EXCLUSIVE LICENSE NATIONAL ...  

Gasification Combined Cycle (IGCC) Operator Training System (OTS) Software. The software license will include source and executable copies of the IGCC Dynamic Model ...

84

LALP-05-111 Licensable Novel Zeolite Synthesis Technologies Method ...  

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA www.lanl.gov/partnerships/license/technologies/ Summary Zeolites and molecular

85

Impact of reduced dose limits on NRC licensed activities. Major issues in the implementation of ICRP/NCRP dose limit recommendations: Final report  

Science Conference Proceedings (OSTI)

This report summarizes information required to estimate, at least qualitatively, the potential impacts of reducing occupational dose limits below those given in 10 CFR 20 (Revised). For this study, a questionnaire was developed and widely distributed to the radiation protection community. The resulting data together with data from existing surveys and sources were used to estimate the impact of three dose-limit options; 10 mSv yr{sup {minus}1} (1 rem yr{sup {minus}1}), 20 mSv yr{sup {minus}1} (2 rem yr{sup {minus}1}), and a combination of an annual limit of 50 mSv yr{sup {minus}1} (5 rem yr{sup {minus}1}) coupled with a cumulative limit, in rem, equal to age in years. Due to the somewhat small number of responses and the lack of data in some specific areas, a working committee of radiation protection experts from a variety of licensees was employed to ensure the exposure data were representative. The following overall conclusions were reached: (1) although 10 mSv yr{sup {minus}1} is a reasonable limit for many licensees, such a limit could be extraordinarily difficult to achieve and potentially destructive to the continued operation of some licensees, such as nuclear power, fuel fabrication, and medicine; (2) twenty mSv yr{sup {minus}1} as a limit is possible for some of these groups, but for others it would prove difficult. (3) fifty mSv yr{sup {minus}1} and age in 10s of mSv appear reasonable for all licensees, both in terms of the lifetime risk of cancer and severe genetic effects to the most highly exposed workers, and the practicality of operation.

Meinhold, C.B. [Brookhaven National Lab., Upton, NY (United States)

1995-05-01T23:59:59.000Z

86

Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report  

Science Conference Proceedings (OSTI)

This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

Eugene S. Grecheck David P. Batalo

2010-11-30T23:59:59.000Z

87

License Iso. CM35  

Office of Legacy Management (LM)

License Iso. CM35 License Iso. CM35 hUhUll4MhiM&POlltYll7~ llolh-thRqalStract Alolan&le, vlrghla Attoatlonl w. & 0. EutahlDon Pursuant to the Atanic Energy Act of 1954 and Section 40.21 or the Code of Federal Regulations, Title 10 - Atomic Energy, Chapter 1, Part 40 - Control of Sauce Haterid, you are hereby licensed to receive possession of and title to three hundred uwi l lght the term of this liceaee for pounda of refined eource material during 880 in meueb and demlopmt aotiritim MDool.atd lfltb fual oleroat f*hrlcmtlon. You are nirthcr licensed to transfer aad deliver poaaeeslon of and title to refined ecwce material to any person licensed by the Atcmlc Energy ~~slon, VitAin the limits of his license. i f Am a condition of iemzaace of thie llcenee, you are required to maintain

88

License Application Guidelines  

market, and describe how the funding will be obtained. LICENSE APPLICATION GUIDELINES 6. ... Key events that have led to your companys current position in the

89

END USER LICENSE  

to be accessed over the internet; c. LICENSEE may copy the Software solely to the extent necessary to exercise the foregoing license, ...

90

END USER LICENSE SAC  

to be accessed over the internet; c. LICENSEE may copy the Software solely to the extent necessary to exercise the foregoing license, ...

91

Licensing Guidelines | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

parties. Licenses that include the right to sublicense to others also include financial terms for sublicensing revenue that is based on the commercialization of the technology by a...

92

Licensing Berkeley Lab Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

to inquire. For more information on licensing, please see Frequently Asked Questions . Contact Us Receive Customized Tech Alerts Tech Transfer Site Map Last updated: 09172009...

93

Assessment of Operationally-Issued Long Range Precipitation Outlooks for Illinois  

Science Conference Proceedings (OSTI)

As a result of a 198081 drought, statistically derived outlooks of monthly and seasonal precipitation began to be issued to Illinois officials who were making management decisions relating to water supplies and agricultural activities. Outlooks ...

Stanley A. Changnon Jr.; Chin-Fei Hsu

1985-03-01T23:59:59.000Z

94

Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues  

E-Print Network (OSTI)

inoff?peakloads(pumpedstorageorretailcustomerexcessof4,000MWofpumpedstorage capabilitythat,ifthisissue. Alsonewpumped storagefacilitiescouldbe

Budhraja, Vikram

2008-01-01T23:59:59.000Z

95

City of Madison - Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Madison - Contractor Licensing of Madison - Contractor Licensing City of Madison - Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Water Heating Program Info State Wisconsin Program Type Solar/Wind Contractor Licensing Provider City of Madison Although the State of Wisconsin does not have any specific laws for contractors dealing with renewable energy, the City of Madison has issued rules for contractor licensing and equipment standards for solar thermal installations. In the City's Heating, Ventilating and Air Conditioning Code is a requirement for a Class A-4 license for "a person desiring to enter into the business of installing, altering or repairing active solar heating equipment" as well as fee and examination details. As a result of a

96

NEXT GENERATION NUCLEAR PLANT LICENSING BASIS EVENT SELECTION WHITE PAPER  

SciTech Connect

The Next Generation Nuclear Plant (NGNP) will be a licensed commercial high temperature gas-cooled reactor (HTGR) plant capable of producing the electricity and high temperature process heat for industrial markets supporting a range of end-user applications. The NGNP Project has adopted the 10 CFR 52 Combined License (COL) application process, as recommended in the Report to Congress, dated August 2008, as the foundation for the NGNP licensing strategy. NRC licensing of the NGNP plant utilizing this process will demonstrate the efficacy of licensing future HTGRs for commercial industrial applications. This white paper is one in a series of submittals that will address key generic issues of the COL priority licensing topics as part of the process for establishing HTGR regulatory requirements.

Mark Holbrook

2010-09-01T23:59:59.000Z

97

Licensable Life Science Technologies | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensable Life Science Technologies A selection of biology-based technologies available for licensing licensablebiologicaltechnologies...

98

Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1  

Science Conference Proceedings (OSTI)

NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

NONE

1996-02-01T23:59:59.000Z

99

Task 23 - background report on subsurface environmental issues relating to natural gas sweetening and dehydration operations. Topical report, February 1, 1994--February 28, 1996  

Science Conference Proceedings (OSTI)

This report describes information pertaining to environmental issues, toxicity, environmental transport, and fate of alkanolamines and glycols associated with natural gas sweetening and dehydration operations. Waste management associated with the operations is also discussed.

Sorensen, J.A.

1998-12-31T23:59:59.000Z

100

Calvert Cliffs License Renewal Aging Management Review Reports  

Science Conference Proceedings (OSTI)

This report and associated CD-ROM documents the Calvert Cliffs License Renewal Aging Management Review Reports as of December 1998. The option to operate a nuclear power plant beyond its initial license term of 40 years is an important factor in financial decisions and long-term planning for utility asset management and capital improvement. This report provides other utilities with details of the technical evaluations to support their own preparation of a License Renewal Application (LRA).

1999-06-23T23:59:59.000Z

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification, Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance  

Science Conference Proceedings (OSTI)

Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.

R. Fink, D. Hill, J. O'Hara

2004-11-30T23:59:59.000Z

102

Potential for by-product recovery in geothermal energy operations issue paper  

DOE Green Energy (OSTI)

This document identifies and discusses the significant issues raised by the idea of recovering useful by-products from wastes (primarily spent brine) generated during geothermal power production. The physical availability of numerous valuable materials in geothermal brines has captured the interest of geothermal resource developers and other parties ever since their presence was known. The prospects for utilizing huge volumes of highly-saline geothermal brines for electricity generation in the Imperial Valley of California have served to maintain this interest in both private sector and government circles.

None

1982-07-01T23:59:59.000Z

103

Public comments on the proposed 10 CFR Part 51 rule for renewal of nuclear power plant operating licenses and supporting documents: Review of concerns and NRC staff response. Volume 1  

SciTech Connect

This report documents the Nuclear Regulatory Commission (NRC) staff review of public comments provided in response to the NRC`s proposed amendments to 10 Code of Federal Regulations (CFR) Part 51, which establish new requirements for the environmental review of applications for the renewal of operating licenses of nuclear power plants. The public comments include those submitted in writing, as well as those provided at public meetings that were held with other Federal agencies, State agencies, nuclear industry representatives, public interest groups, and the general public. This report also contains the NRC staff response to the various concerns raised, and highlights the changes made to the final rule and the supporting documents in response to these concerns.

NONE

1996-05-01T23:59:59.000Z

104

PNNL: Technology Transfer - Our Licensing Guidelines  

NLE Websites -- All DOE Office Websites (Extended Search)

Our Licensing Guidelines PNNL approaches licensing in a flexible, collaborative manner Although every technology license is unique, at PNNL we recognize that there are basic...

105

Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification: Guidelines for Planning, Specifi cation, Design, Licensing, Implementation, Training, Operation, and Maintenance  

Science Conference Proceedings (OSTI)

Operators of nuclear power plants face a significant challenge designing and modifying control rooms that will be produced at various stages of instrumentation and control modernization. This report provides guidance on planning, specifying, designing, implementing, operating, maintaining, and training for modernized control rooms and digital human-system interfaces. Much of the guidance also will support new plant control rooms. This report also presents detailed information and guidelines on specific t...

2004-11-29T23:59:59.000Z

106

Successful Clean Coal Technology Licensed for Commercial Application |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Successful Clean Coal Technology Licensed for Commercial Successful Clean Coal Technology Licensed for Commercial Application Successful Clean Coal Technology Licensed for Commercial Application July 26, 2010 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) has received the first installment from a repayment agreement for the Liquid Phase Methanol (LPMEOH™) Process. A royalty license issued for the advanced methanol production system underscores the clean coal technology's presence in the commercial market. The DOE-funded LPMEOH Process, developed in collaboration with Air Products and Chemicals Inc., has been licensed to Woodland Biofuel Inc., who intends to use the technology to develop a wood-gasification process to produce methanol from wood-scrap. The first facility is planned in New York State.

107

Solar and Wind Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar and Wind Contractor Licensing Solar and Wind Contractor Licensing Solar and Wind Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Water Heating Wind Program Info State Connecticut Program Type Solar/Wind Contractor Licensing Provider Connecticut Department of Consumer Protection The Connecticut Department of Consumer Protection (DCP) is authorized to issue licenses for solar-thermal work, solar-electric work and wind-electric work. "Solar thermal work" is defined as "the installation, erection, repair, replacement, alteration, or maintenance of active, passive and hybrid solar systems that directly convert ambient energy into heat or convey, store or distribute such ambient energy." Solar electricity

108

License extension for the MIT research reactor  

Science Conference Proceedings (OSTI)

On February 8, 1995, the U.S. Nuclear Regulatory Commission (NRC) amended the operating license for the Massachusetts Institute of Technology (MIT) research reactor (MITR) by extending its expiration date from May 7, 1996, to August 8, 1999. This increase of 2.25 yr in the duration of the license was for the purpose of recapturing construction time. Extensions of this type have routinely been granted to power plants. The significance of the present action is that it is the first such extension ever granted to a research reactor. This paper describes the basis for the amendment request and the supporting safety analysis.

Bernard, J.A. [Massachusetts Institute of Technology, Cambridge, MA (United States)

1995-12-31T23:59:59.000Z

109

Argonne TDC: Licensing Intellectual Property from Argonne ...  

Licensing Intellectual Property from Argonne National Laboratory. Argonne's licensing program provides companies with opportunities to acquire rights in Argonne ...

110

Summary of Utility License Termination Documents and Lessons Learned: Summary of License Termination Plan Submittals by Three Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The U.S. Nuclear Regulatory Commission's (NRC's) 1996 revised decommissioning regulations specify that the operator of a nuclear plant must submit a "License Termination Plan" (LTP) two years prior to termination of the plant license. The LTP explicitly defines the elements that the plant operator must address in the decommissioning plan. This report focuses on the approaches and experience gained by three of the leading plants in the preparation and submittal of their LTP submittals under the 1996 regul...

2002-10-28T23:59:59.000Z

111

NREL: Technology Transfer - Licensing Agreements  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensing Agreements Licensing Agreements Through licensing agreements, NREL provides industry with an opportunity to commercialize NREL-developed energy technologies and products. Our licensing opportunities are available to both small and large businesses-from start-ups to Fortune 500 companies. Process The licensing agreement process basically includes seven steps. See the NREL Licensing Agreement Process flowchart. We are committed to working through these steps in a timely manner. Experience suggests that the fastest means to reach an agreement is through direct communications to create understanding and agree on actions. 1. Identify and Qualify Opportunity To identify an opportunity, a company can browse the technologies available for licensing. When an opportunity has been identified, NREL then asks the company to

112

LA-UR-08-0123a Licensable Explosives Ordnance Disposal Using ...  

An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA www.lanl.gov/partnerships/license/technologies/ Summary:

113

LALP-08-045 Licensable Lead-Free Super-Thermite Electric Matches  

Licensable Technologies Lead-Free Super-Thermite Electric Matches An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA

114

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Licensing Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Commercial Heating & Cooling Solar Heating Buying & Making Electricity Swimming Pool Heaters Water Heating Program Info State California Program Type Solar/Wind Contractor Licensing Provider California Contractors State License Board The California Contractors State License Board administers contractor licenses. The C-46 Solar Contractor license covers active solar water and space heating systems, solar pool heating systems, and photovoltaic systems. C-46 requirements include four years of experience and passing the business and law exam and the trade exam. Independent license schools offer courses to prepare for license exams.

115

Analysis of environmental issues related to small-scale hydroelectric development. VI. Dissolved oxygen concentrations below operating dams  

DOE Green Energy (OSTI)

Results are presented of an effort aimed at determining whether or not water quality degradation, as exemplified by dissolved oxygen concentrations, is a potentially significant issue affecting small-scale hydropower development in the US. The approach was to pair operating hydroelectric sites of all sizes with dissolved oxygen measurements from nearby downstream US Geological Survey water quality stations (acquired from the WATSTORE data base). The USGS data were used to calculate probabilities of non-compliance (PNCs), i.e., the probabilities that dissolved oxygen concentrations in the discharge waters of operating hydroelectric dams will drop below 5 mg/l. PNCs were estimated for each site, season (summer vs remaining months), and capacity category (less than or equal to 30 MW vs >30 MW). Because of the low numbers of usable sites in many states, much of the subsequent analysis was conducted on a regional basis. During the winter months (November through June) all regions had low mean PNCs regardless of capacity. Most regions had higher mean PNCs in summer than in winter, and summer PNCs were greater for large-scale than for small-scale sites. Among regions, the highest mean summer PNCs were found in the Great Basin, the Southeast, and the Ohio Valley. To obtain a more comprehensive picture of the effects of season and capacity on potential dissolved oxygen problems, cumulative probability distributions of PNC were developed for selected regions. This analysis indicates that low dissolved oxygen concentrations in the tailwaters below operating hydroelectric projects are a problem largely confined to large-scale facilities.

Cada, G.F.; Kumar, K.D.; Solomon, J.A.; Hildebrand, S.G.

1982-01-01T23:59:59.000Z

116

License Renewal Application PREFACE  

E-Print Network (OSTI)

The following describes the information location, layout, and editorial conventions in the Beaver Valley Power Station (BVPS) License Renewal Application (hereinafter referred to as this application or the application). Abbreviated names and acronyms used throughout the application are defined at the end of this preface. Commonly understood terms (such as U.S.) and terms used only in referenced document numbers may not be identified in this table. Regulatory documents such as NUREG-1801, Generic Aging Lessons Learned (GALL) Report,

Beaver Valley; Power Station

2007-01-01T23:59:59.000Z

117

Regulators Experiences in Licensing and Inspection of Dry Cask Storage Facilities  

SciTech Connect

The United States Nuclear Regulatory Commission (NRC), through the combination of a rigorous licensing and inspection program, ensures the safety and security of dry cask storage. NRC authorizes the storage of spent fuel at an independent spent fuel storage installation (ISFSI) under two licensing options: site-specific licensing and general licensing. In July 1986, the NRC issued the first site-specific license to the Surry Nuclear Power Plant in Virginia authorizing the interim storage of spent fuel in a dry storage cask configuration. Today, there are over 30 ISFSIs currently licensed by the NRC with over 700 loaded dry casks. Current projections identify over 50 ISFSIs by the year 2010. No releases of spent fuel dry storage cask contents or other significant safety problems from the storage systems in use today have been reported. This paper discusses the NRC licensing and inspection experiences. (authors)

Baggett, S.; Brach, E.W. [Spent Fuel Project Office, U.S. Nuclear Regulatory Commission, Washington, DC 20555 (United States)

2006-07-01T23:59:59.000Z

118

Nuclear reactor characteristics and operational history  

Gasoline and Diesel Fuel Update (EIA)

Nuclear > U.S. reactor operation status tables Nuclear > U.S. reactor operation status tables Nuclear Reactor Operational Status Tables Release date: November 22, 2011 Next release date: November 2012 See also: Table 1. Capacity and Generation, Table 2. Ownership Data Table 3. Nuclear Reactor Characteristics and Operational History PDF XLS Plant Name Generator ID Type Reactor Supplier and Model Construction Start Grid Connection Original Expiration Date License Renewal Application License Renewal Issued Extended Expiration Arkansas Nuclear One 1 PWR Babcock&Wilcox, Lower Loop 10/1/1968 8/17/1974 5/20/2014 2/1/2000 6/20/2001 5/20/2034 Arkansas Nuclear One 2 PWR Combustion Eng. 7/1/1971 12/26/1978 7/17/2018 10/15/2003 6/30/2005 7/17/2038

119

Nondestructive Evaluation: Plant Aging/License Renewal Nondestructive Examination Gap Solutions and Strategies, Vol. 1  

Science Conference Proceedings (OSTI)

This report provides strategic direction to the development of nondestructive evaluation (NDE) technology and programs for the management of aging nuclear power plants and plant license renewal. Section 2 provides project proposal descriptions developed by staff of the Electric Power Research Institute (EPRI) to address issues identified by the Aging Plant NDE Working Group. Section 3 is a summary of support provided to the License Renewal Integration Working Group on NDE related to license renewal. Sect...

2008-12-22T23:59:59.000Z

120

TO :Lyall E. Johnson, Chief Licensing Branch  

Office of Legacy Management (LM)

Lyall E. Johnson, Chief Lyall E. Johnson, Chief Licensing Branch ,,,_ i-.. FROM :Clifford K. Beck, Chief q q+. ., ,,/,j !i-/ I, v' Hazards Evaluation Branch ,: s~~p:~LLItma0~7c ~HEI-IICAL wows We have reviewed the letter of December 10, 1958, from Mallinckrodt Chemical Works, requesting amendment of License No. SNM-33 to permit pelleting operations on uranium enriched to 5% U-235 in a new facility at Hematite, Missouri. Batch sizes throughout the operations will not exceed limited safe masses as specified in Report K-1019, Part 4 (Deleted). Neither the diameter nor capacity of the storage hopper located above the feed hopper of the pelleting press is given. Either the diameter should be not over the limited safe dimension or positive means should be in effect to insure against more than a limited safe m&s in the

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Technology Licensing Contacts | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

(865) 574-1051 Biography Robert Scott Administrative Assistant scottre@ornl.gov (865) 241-2356 Jennifer Caldwell Technology Licensing, Group Leader caldwelljt@ornl.gov (865)...

122

Combined Construction and Operating License (COL)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Updates available at: http://www.nuclear.gov NEXT UPDATE - October 2012 Page 1 News Updates  The final ruling on the design certification for Mitsubishi Heavy Industries' APWR has been revised until 2015. Structural changes were made to the design by vendor, which requires a new seismic analysis to be performed. Because of this, the review schedule for the COL applications for Comanche Peak and North Anna has been delayed by approximately 18 months.  The final ruling on Areva's EPR design certification has been revised from June 2013 until the end of 2014. The change is to allow Areva to

123

Combined Construction and Operating License (COL)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

fuel. The EIS and rule are to be completed within 24 months. Due to low natural gas prices and unfavorable economic conditions, Exelon has withdrawn its application for...

124

Guideline on Licensing Digital Upgrades - TR-102348 Revision 1 - NEI 01-01: A Revision of EPRI TR-102348 to Reflect Changes to the 10 CFR 50.59 Rule  

Science Conference Proceedings (OSTI)

To continue meeting safety and reliability requirements while controlling operating costs, operators of nuclear power plants must be able to replace and upgrade equipment in a cost-effective manner. Upgrades to plant equipment and especially instrumentation and control (I&C) systems typically involve either replacement of analog devices with more modern digital technology or updating existing digital equipment. However, the use of digital technology has raised new design and licensing issues. This guide ...

2002-03-08T23:59:59.000Z

125

BIOLOGICAL ASSESSMENT FOR BALD EAGLES FOR LICENSE RENEWAL  

E-Print Network (OSTI)

The Nuclear Regulatory Commission (NRC) is evaluating an application submitted by Virginia Electric and Power Company (VEPCo) for the renewal of the operating licenses for an additional 20 years for its Surry Power Station (SPS), Units 1 and 2. The SPS is located on the Gravel Neck Peninsula in Surry County, Virginia. The current license for Unit 1 will expire on May 25, 2012, and for Unit 2 on January 29, 2013. License renewal will extend the operating license for each unit an additional 20 years past the above dates. The proposed action would include the continued operation and maintenance of the existing facilities at the SPS site and the transmission corridor that connects the SPS, Units 1 and 2, to the regional electrical grid. The proposed action will not include any new construction or onsite disturbance. The NRC is preparing a supplement to its 1996?Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG-1437) for this proposed license renewal. As part of the renewal review, we evaluate potential impacts to Federally listed, proposed, or candidate species, as well as designated or proposed critical habitat. In a letter to the Virginia Field Office of the U.S. Fish and Wildlife Service (FWS) dated January 24, 2002, the NRC staff requested a list of Federally protected species and any critical

John P. Wolflin; U. S. Fish; Wildlife Service

2002-01-01T23:59:59.000Z

126

REVIEWS FOR IN SITU LEACH URANIUM EXTRACTION LICENSE APPLICATIONS  

E-Print Network (OSTI)

Review Plan (NUREG1569) which provides guidance for staff reviews of applications to develop and operate uranium in situ leach facilities. Under the provisions of Title 10 of the Code of Federal Regulations, Part 40 (10 CFR Part 40), Domestic Licensing of Source Material, an NRC Materials License is required to conduct uranium recovery by in situ leach extraction techniques. Applicants for a new license and operators seeking an amendment or renewal of an existing license are required to provided detailed information on the facilities, equipment, and procedures used in the proposed activities. In addition, the applicant for a new license also provides an Environmental Report that discusses the effects of proposed operations on the health and safety of the public and assesses impacts to the environment. For amendment or renewal of an existing license, the original Environmental Report is supplemented, as necessary. This information is used by the NRC staff to determine whether the proposed activities will be protective of public health and safety and the environment and to fulfill NRC responsibilities under the National Environmental Policy Act (NEPA). The purpose of the Standard Review Plan (NUREG1569) is to provide the NRC staff with guidance on performing reviews of information provided by the applicant, and to ensure a consistent quality and

In Situ; Leach Uranium; In Situ; Leach Uranium; J. Lusher

2003-01-01T23:59:59.000Z

127

The Atomic Safety and Licensing Board Panel  

SciTech Connect

Through the Atomic Energy Act, Congress made is possible for the public to get a full and fair hearing on civilian nuclear matters. Individuals who are directly affected by any licensing action involving a facility producing or utilizing nuclear materials may participate in a formal hearing, on the record, before independent judges on the Atomic Safety and Licensing Board Panel (ASLBP or Panel). Frequently, in deciding whether a license, permit, amendment, or extension should be granted to a particular applicant, the Panel members must be more than mere umpires. If appropriate, they are authorized to go beyond the issues the parties place before them in order to identify, explore, and resolve significant questions involving threats to the public health and safety that come to a board`s attention during the proceedings. This brochure explains the purpose of the panel. Also addressed are: type of hearing handled; method of public participation; formality of hearings; high-level waste; other panel responsibilities and litigation technology.

NONE

1998-03-01T23:59:59.000Z

128

License Application Design Selection Report, REV 01. August 1999  

Science Conference Proceedings (OSTI)

In December 1998, the U.S. Department of Energy (DOE) published the ''Viability Assessment of a Repository at Yucca Mountain'' (DOE 1998b). The Viability Assessment described a preliminary design of a potential repository at Yucca Mountain, Nevada, for disposal of spent nuclear fuel and high-level radioactive waste, and assessed the probable behavior of that repository design in the Yucca Mountain geologic setting. The report concluded that 'Yucca Mountain remains a promising site for a geologic repository and that work should proceed to support a decision in 2001 on whether to recommend the site to the President for development as a repository'. It also concluded that 'uncertainties remain about key natural processes, the preliminary design, and how the site and design would interact'. Recognizing that the design that was evaluated will be refined before a license application could be submitted, the Viability Aassesment notes that 'DOE is evaluating several design options and alternatives that could reduce existing uncertainty and improve the performance of the repository system'. During the preparation of the Viability Assessment, DOE asked the contractor for the Civilian Radioactive Waste Management Program to study alternative design concepts for a potential geologic repository for high-level radioactive waste at Yucca Mountain. The License Application Design Selection (LADS) project was initiated to conduct that study. The goal of the project was to develop and evaluate a diverse range of conceptual repository designs that work well in concert with the Yucca Mountain site and to recommend an initial design concept for the possible Site Recommendation and License Apllication. This report presents the results of the LADS project. The design process consisted of two phases. In Phase I, a series of basic design concepts (design alternatives) and components (design features) were analyzed for their potential value as elements of a repository design. In Phase II, these enhanced design alternatives were refined, screened for accepatable postclosure performance, and evaluated against a set of criteria addressing four broad aspects of the repository: performance demonstrability; flexibility; construction, operations and maintenance; and cost. Based on this evaluation, a conceptual design was recommended to DOE and could be characterized as a low thermal impact design. Included in the report is more in depth information regarding the basis of the recommendation, performance issues, benefits related to reduced uncertainties, construction/operational benefits, technical and programmatic flexibilty and cost impacts.

Hastings, C.R.

1999-08-30T23:59:59.000Z

129

Transmittal of Additional Information For License  

E-Print Network (OSTI)

By letter dated June 5, 2001 Southern Nuclear Operating Company (SNC) formally transmitted the collected responses to eighteen open items contained in the draft license renewal Safety Evaluation Report to NRC. Since that time additional information has been developed on several open items, and Appendix B, the FSAR Supplement, and various application sections have been revised. This letter formally transmits all additional information related to the Hatch license renewal application and the related open items, and is intended to complete the documentation necessary to allow the open items to be closed by the NRC. If you have any questions concerning this information, please contact this office. Respectfully submitted, HLS/JAM H. L. Sumner, Jr. Enclosures:

Lewis Sumner; Edwin I. Hatch; Nuclear Plant

2001-01-01T23:59:59.000Z

130

Renewable Energy Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Licensing Contractor Licensing Renewable Energy Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Solar Buying & Making Electricity Home Weatherization Water Heating & Cooling Commercial Heating & Cooling Heating Water Heating Wind Program Info State Oregon Program Type Solar/Wind Contractor Licensing Provider Department of Consumer and Business Services Oregon requires trade licenses for people installing solar energy equipment, and contractor licenses for the companies that do construction. Companies with an electrical contractor license may engage in the business of making electrical installations. Similarly a plumbing contractor license allows a company to engage in the business of making plumbing

131

Technologies Available for Licensing | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Licensing Technology Licensing How To License ORNL Technologies Licensing Guidelines NDA(s) and MTA(s) Sample Licensing Agreement Technology Innovation Program Technology Assistance Program Licensing Staff Search For Technologies Available Technologies Analytical Instrumentation Chemicals Detectors and Sensors Energy and Utilities Healthcare and Biology Information Technology and Communications Manufacturing Materials Security and Defense Transportation Licensing Opportunity Announcements Partnerships Home | Connect with ORNL | For Industry | Partnerships | Technology Licensing | Available Technologies SHARE Available Technologies One of the primary missions of the Technology Transfer Division is to move our intellectual property from the research facility to the commercial

132

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Solar Buying & Making Electricity Heating & Cooling Swimming Pool Heaters Water Heating Commercial Heating & Cooling Heating Program Info State Nevada Program Type Solar/Wind Contractor Licensing Provider Nevada State Contractors Board - Reno Nevada law requires that solar energy system installers be licensed by the Nevada State Contractors Board. Contractors may be licensed under License Classification C-37 (solar contracting for solar water heating and space heating and air conditioning). Contractors may also perform solar work under License Classification C-1* (plumbing and heating), sub-classification (d) for solar water heating installations, or

133

Property:FERC License | Open Energy Information  

Open Energy Info (EERE)

License Jump to: navigation, search Property Name FERC License Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense&oldid610683...

134

DANESS DEVELOPERS SOFTWARE LICENSE AGREEMENT This Agreement ...  

Daness Developers Web License,.Version, 4.5, Sept. 2009 1 DANESS DEVELOPERS SOFTWARE LICENSE AGREEMENT. This Agreement, is made between the UChicago Argonne ...

135

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

general plumbing contractors carrying an S210 license are authorized to install solar thermal systems. The Division has also established solar-specific license classifications....

136

Sandia National Laboratories : Licensing/Technology Transfer ...  

IP Home; Search/Browse Technology Portfolios; Licensing Overview; Ready-to-Sign Licenses; DOE SBIR TTI; Government Use Notices; News; Contact Us; Technology Summary

137

NREL: Technology Transfer - Nonexclusive and Exclusive Licenses  

Nonexclusive and Exclusive Licenses. NREL's technology licensing agreements with companies are either nonexclusive or exclusive depending on their field of use.

138

Featured Licensing Professional - Energy Innovation Portal  

Eric Payne. Meet Eric Payne! Eric is the Senior Licensing Executive at the National Renewable Energy Laboratory and one of the licensing contacts on the Energy ...

139

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Eligibility InstallerContractor Savings For Solar Buying & Making Electricity Heating & Cooling Commercial Heating & Cooling...

140

Photovoltaics at DOE's National Renewable Energy Laboratory License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOLAR ROOF-TOP LICENSE AGREEMENT KEY TERMS SOLAR ROOF-TOP LICENSE AGREEMENT KEY TERMS (Non-Recordable) FOR INSTALLATION AND OPERATION OF A SOLAR ROOF-TOP ELECTRIC GENERATING SYSTEM AT THE NATIONAL RENEWABLE ENERGY LABORATORY, RESEARCH SUPPORT FACILITY United States of America Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office THIS LICENSE AGREEMENT (License) is made as of the _____ day of August, 2009, by the UNITED STATES OF AMERICA, Department of Energy, Office of Energy Efficiency and Renewable Energy, Golden Field Office, hereinafter referred to as LICENSOR, and SunEdison Origination1, LLC, hereinafter referred to as LICENSEE. WHEREAS, the LICENSOR owns certain buildings located at the National Renewable Energy Laboratory (NREL) and in particular, [____________________] the address of which

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Photovoltaics at DOE's National Renewable Energy Laboratory License  

NLE Websites -- All DOE Office Websites (Extended Search)

ROOF-TOP LICENSE AGREEMENT KEY TERMS ROOF-TOP LICENSE AGREEMENT KEY TERMS (Non-Recordable) FOR INSTALLATION AND OPERATION OF A SOLAR ROOF-TOP ELECTRIC GENERATING SYSTEM AT THE NATIONAL RENEWABLE ENERGY LABORATORY, RESEARCH SUPPORT FACILITY United States of America Department of Energy Office of Energy Efficiency and Renewable Energy Golden Field Office THIS LICENSE AGREEMENT (License) is made as of the _____ day of August, 2009, by the UNITED STATES OF AMERICA, Department of Energy, Office of Energy Efficiency and Renewable Energy, Golden Field Office, hereinafter referred to as LICENSOR, and SunEdison Origination1, LLC, hereinafter referred to as LICENSEE. WHEREAS, the LICENSOR owns certain buildings located at the National Renewable Energy Laboratory (NREL) and in particular, [____________________] the address of which

142

How to License Technologies | Partnerships | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Technology Licensing Technology Licensing How To License ORNL Technologies Licensing Guidelines NDA(s) and MTA(s) Sample Licensing Agreement Technology Innovation Program Technology Assistance Program Licensing Staff Search For Technologies Available Technologies Licensing Opportunity Announcements Partnerships Home | Connect with ORNL | For Industry | Partnerships | Technology Licensing | How To License ORNL Technologies SHARE How To License ORNL Technologies Technology Evaluation The first step in the licensing process is for you to identify technologies of interest to you. As a starting point, you may wish to browse the available technologies or search using keywords and the ORNL InSpire Technology Search Engine. At any point in your search, please feel free to contact the commercialization manager identified for each technology or

143

Alternative Fuels Data Center: Ethanol License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Ethanol License to Ethanol License to someone by E-mail Share Alternative Fuels Data Center: Ethanol License on Facebook Tweet about Alternative Fuels Data Center: Ethanol License on Twitter Bookmark Alternative Fuels Data Center: Ethanol License on Google Bookmark Alternative Fuels Data Center: Ethanol License on Delicious Rank Alternative Fuels Data Center: Ethanol License on Digg Find More places to share Alternative Fuels Data Center: Ethanol License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Ethanol License Anyone who imports, exports, or supplies ethanol in the state of Wyoming must obtain an annual license from the Wyoming Department of Transportation. The fee for each license is $25. (Reference Wyoming

144

Exclusive License: AGMT-XXXX  

NLE Websites -- All DOE Office Websites (Extended Search)

5.20.2011 UU.S. DEPARTMENT OF ENERGY UNATIONAL ENERGY TECHNOLOGY LABORATORY UEXCLUSIVE PATENT LICENSE AGREEMENT This Agreement is by and between the United States Department of...

145

Draft Surety Bond Rider Associated With Request for Transfer of Licenses Dear Ms. Haney: Purpose  

E-Print Network (OSTI)

The purpose of this letter is to request the U.S. Nuclear Regulatory Commission's (NRC) review and approval of a draft surety bond rider for the American Centrifuge Lead Cascade Facility. Background On December 30, 2010 (Reference 1), the NRC issued approval of the draft financial assurance instrument with one condition. Prior to the execution of the new surety bond, USEC Inc. (USEC) must submit for review a draft of the entire surety bond. This draft of the new surety bond must state the company that will underwrite the bond. The draft bond should also indicate the following on the line following the State of incorporation: "Surety's qualification in jurisdiction where licensed facility is located. " Also, on February 11, 2011 (Reference 2), the NRC issued Order EA- 11-013 in relation to USEC's request for written consent to transfer materials licenses from USEC to a subsidiary limited liability company (LLC), American Centrifuge Operating, LLC. Condition 1 states "USEC will obtain NRC approval on the revised financial assurance instruments for decommissioning of the Lead Cascade Facility." Discussion As stated within the Decommissioning Funding Plan, USEC presently intends to provide for funding through a surety bond. Enclosure 1 of this letter provides the draft surety bond rider which meets the conditions as specified within References 1 and 2. Action USEC respectfully requests that the NRC complete their review of the enclosed draft surety bond rider for the American Centrifuge Lead Cascade Facility by May 20, 2011.

Peter J

2011-01-01T23:59:59.000Z

146

Solar Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Contractor Licensing Solar Contractor Licensing Solar Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Solar Buying & Making Electricity Heating & Cooling Swimming Pool Heaters Water Heating Commercial Heating & Cooling Heating Program Info State Arizona Program Type Solar/Wind Contractor Licensing Provider Registrar of Contractors The Arizona Registrar of Contractors does not offer a general solar electric contractor license, but the state's C-11/L-11 electrical license covers solar electric installations. C-11 licenses are required for electrical work on residential property and L-11 licenses apply to commercial installations. Contractors can also acquire a K-11 license to work on both residential and commercial installations. The Arizona Registrar of Contractors does have a specific plumbing license

147

NETL: News Release - Successful Clean Coal Technology Licensed for  

NLE Websites -- All DOE Office Websites (Extended Search)

6, 2010 6, 2010 Successful Clean Coal Technology Licensed for Commercial Application DOE Receives First Repayment for Liquid Phase Methanol Process Development Washington, DC - The U.S. Department of Energy (DOE) has received the first installment from a repayment agreement for the Liquid Phase Methanol (LPMEOH(tm)) Process. A royalty license issued for the advanced methanol production system underscores the clean coal technology's presence in the commercial market. The DOE-funded LPMEOH Process, developed in collaboration with Air Products and Chemicals Inc., has been licensed to Woodland Biofuel Inc., who intends to use the technology to develop a wood-gasification process to produce methanol from wood-scrap. The first facility is planned in New York State.

148

Alternative Fuels Data Center: Alternative Fuel License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Fuel License to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel License on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel License on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel License on Google Bookmark Alternative Fuels Data Center: Alternative Fuel License on Delicious Rank Alternative Fuels Data Center: Alternative Fuel License on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel License Any person acting as an alternative fuels dealer must hold a valid alternative fuel license and certificate from the Wisconsin Department of Administration. Except for alternative fuels that a dealer delivers into a

149

Revised Industry Steam Generator Program Generic License Change Package  

E-Print Network (OSTI)

License Change Package for NRC review and endorsement. Industry events during the subsequent months have delayed the NRC review and presented an opportunity for the industry to improve the submittal. A summary of the major changes from the February submittal is provided in Enclosure 1. The resulting package (Enclosures 2 through 8), which supercedes the earlier version in its entirety, is enclosed for your endorsement. Although the events of the last ten months have resulted in some changes to the industry steam generator program guidance, the fundamental principles remain sound. Equally as important, the program has demonstrated its resiliency. The steam generator program guidance is designed to accommodate new knowledge and experience, and that is precisely what is occurring. The enclosed Generic License Change Package includes changes that reflect recent experience. In addition, the appropriate underlying technical documents are currently being revised or supplemental guidance is being developed as necessary to reflect new information. The industry and the NRC worked diligently to address the technical and licensing issues that ultimately resulted in the February 2000 version of the Steam Generator Program Generic License Change Package. Although these documents have been revised since the previous submittal, the differences do not represent a change in our position on the issues.

David J. Modeen; Mr. Samuel; J. Collins; U. S. Nuclear; Regulatory Commission; Xuo Mr; Samuel J. Collins

2000-01-01T23:59:59.000Z

150

Operator Certification Standards for Fossil Fuel Fired Plants: Survey of State and Regional Requirements  

Science Conference Proceedings (OSTI)

The Environmental Protection Agency has only started addressing the issue of certification for fossil fuel power plant operators within the last two years. This report, which includes data collected from research of state and local authorities that currently require power plant operators to be certified or licensed, is the first phase of a certification program for Fossil Fuel Fired Power Plants. The report also addresses the possible future shortage of skilled workers needed by the power plants and the ...

1999-12-16T23:59:59.000Z

151

Sensor network based vehicle classification and license plate identification system  

Science Conference Proceedings (OSTI)

Typically, for energy efficiency and scalability purposes, sensor networks have been used in the context of environmental and traffic monitoring applications in which operations at the sensor level are not computationally intensive. But increasingly, ... Keywords: acoustic vehicle classification, license plate detection, seismic, wireless sensor networks

Jan Frigo; Vinod Kulathumani; Sean Brennan; Ed Rosten; Eric Raby

2009-06-01T23:59:59.000Z

152

SUBJECT: SAFETY EVALUATION REPORT WITH OPEN ITEMS RELATED TO THE LICENSE RENEWAL OF KEWAUNEE POWER STATION (TAC NO. MD9408)  

E-Print Network (OSTI)

The license renewal application (LRA) was submitted pursuant to Title 10 of the Code of Federal Regulations Part 54, "Requirements for Renewal of Operating Licenses for Nuclear Power Plants. " The staff determined that the LRA was complete and acceptable for docketing on September 25,2008. The staff has reviewed the KPS LRA and has developed the enclosed "Safety Evaluation Report With Open Items related to the License Renewal of the Kewaunee Power Station," hereinafter referred to as the Safety Evaluation Report (SER). This SER reflects the status of the staff's review of the LRA, requests for additional information (RAts), the applicant's responses to the staff's RAls, and other questions related to the LRA through March 26, 2010, unless otherwise noted. Issuance of the enclosed SER is an important milestone for both the applicant and the staff. The staff has identified four open items in its review which must be resolved before it can make a final determination on the application. SER Section 1.5 includes a listing of the open items with a summary of the information required to satisfactorily resolve the issues. In order to resolve these items, the staff has requested additional information, as identified in the SER.

United States; Mr. David; A. Heacock; Dear Mr. Heacock

2010-01-01T23:59:59.000Z

153

Authorization and Driving History Form The following information will be retained on file by all agencies on their drivers authorized to operate a  

E-Print Network (OSTI)

agencies on their drivers authorized to operate a State vehicle, or a private vehicle for state purposes ******************************************************************************************** AGENCY HEAD OR DESIGNEE STATEMENT I have reviewed this individual's genuine need to drive a State Vehicle of Birth ______________________________________ Issuing State _________ Class License _______ Phone Number

Harms, Kyle E.

154

Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective  

SciTech Connect

Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in decommissioning planning, conduct of decommissioning operations, volumes of low- level radioactive waste disposed, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated their 10 CFR Part 50 license. Maine Yankee elected to obtain a general license under 10 CFR Part 50 for the ISFSI and reduce the physical site footprint to the ISFSI through a series of license amendments. While the NRC regulations are flexible and allow different approaches to ISFSI licensing there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, public input resulted in the licensee entering into an agreement with a concerned citizen group and resulted in State legislation that significantly lowered the dose limit below the NRC radiological criteria of 25 mrem (0.25 mSv) per year (yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs) that were well below the NRC DCGL screening values. This contributed to a longer than anticipated period to obtain NRC approval of the Maine Yankee License Termination Plan (LTP). By employing the lessons learned from its first LTP submittal, which was not accepted by the NRC staff, Trojan was able to obtain approval of its revised LTP promptly. While both licensees provided final status survey reports (FSSRs) for NRC approval, the Trojan approach to decommissioning and data management allowed NRC to efficiently review FSS records and supporting documentation. Therefore, NRC was able to review Trojan's FSSR more efficiently than Maine Yankee's FSSR. This paper describes the regulatory impacts of the two different approaches to the decommissioning, the development of licensee required plans, decommissioning operations and records, the differences in licensing processes, and the lessons learned for improving the processes. (authors)

Watson, B.A.; Buckley, J.T.; Craig, C.M. [U.S. Nuclear Regulatory Commission, Office of Nuclear Materials Safety and Safeguards, Decommissioning Directorate (T7E18), Washington, D.C. 20555 (United States)

2006-07-01T23:59:59.000Z

155

Steam generation in line-focus solar collectors: a comparative assessment of thermal performance, operating stability, and cost issues  

DOE Green Energy (OSTI)

The engineering and system benefits of using direct steam (in situ) generation in line-focus collectors are assessed. The major emphasis of the analysis is a detailed thermal performance comparison of in situ systems (which utilize unfired boilers). The analysis model developed for this study is discussed in detail. An analysis of potential flow stability problems is also provided along with a cursory cost analysis and an assessment of freeze protection, safety, and control issues. Results indicated a significant thermal performance advantage over the more conventional oil and flash systems and the flow stability does not appear to be a significant problem. In particular, at steam temperatures of 220/sup 0/C (430/sup 0/F) under the chosen set of assumptions, annual delivered energy predictions indicate that the in situ system can deliver 15% more energy than an oil system and 12% more energy than a flash system, with all of the systems using the same collector field. Further, the in situ system may result in a 10% capital cost reduction. Other advantages include improvement in simpler control when compared with flash systems, and fluid handling and safety enhancement when compared with oil systems.

Murphy, L.M.; May, E.K.

1982-04-01T23:59:59.000Z

156

Sandia National Laboratories : Licensing/Technology Transfer ...  

Ready-to-Sign licenses require that R & D and substantial manufacture of the licensed product occur within the U.S. to provide benefit to the U.S. economy.

157

Alternative Fuels Data Center: Alternative Fuel License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Fuel Fuel License to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel License on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel License on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel License on Google Bookmark Alternative Fuels Data Center: Alternative Fuel License on Delicious Rank Alternative Fuels Data Center: Alternative Fuel License on Digg Find More places to share Alternative Fuels Data Center: Alternative Fuel License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Alternative Fuel License Alternative fuel providers, bulk users, and retailers, or any person who fuels an alternative fuel vehicle from a private source that does not pay

158

Experimental and theoretical investigation of operational and survivability issues in thermal radiators for thermionic space nuclear power systems. Final report  

SciTech Connect

Heat pipes are a promising candidate for spacecraft radiators. This report describes a program designed to investigate the mass migration phenomenon in heat pipes. The program involved experiments to observe and measure the mass migration rates in both high and low operating temperature heat pipes. The low-temperature experiments were intended to simulate the operation of high-temperature, liquid metal heat pipes. Octadecane was the selected low-temperature working fluid. It is a paraffin and exhibits some of the characteristics of liquid metal working fluids. Sodium was the working fluid used in the high temperature experiment. A one-dimensional compressible flow model was developed for describing the hydrodynamics of rarefied vapor flow in heat pipe condensers. This model was compared with experimental data for the low-temperature octadecane heat pipes and the high-temperature sodium heat pipe. The model was found to satisfactorily predict the temperature profiles and location of freeze-fronts for the low-temperature heat pipes. Mass migration rate predictions using the model were satisfactory for the low-temperature heat pipes as well. However, the mass migration prediction for the high-temperature, sodium heat pipe was not in agreement with experimental data. An analytical model which accounts for property variations in the radial as well as longitudinal directions is recommended. A one-dimensional model was unsatisfactory for predicting mass migration rates in liquid metal heat pipes.

Keddy, M.D.

1994-03-15T23:59:59.000Z

159

Guide to Microsoft Volume Licensing June 2013 i  

E-Print Network (OSTI)

Guide to Microsoft Volume Licensing June 2013 i Guide to Microsoft Volume Licensing #12;Guide to Microsoft Volume Licensing June 2013 ii Table of Contents Chapter 1: Introduction to Microsoft Volume................................................................................................................................................................ 1 Keys to Understanding Microsoft Volume Licensing

Narasayya, Vivek

160

Vehicles and Fuels Technologies Available for Licensing ...  

Vehicles and Fuels Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have ...

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Advanced Materials Technologies Available for Licensing ...  

Advanced Materials Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have ...

162

Solar Thermal Technologies Available for Licensing ...  

Solar Thermal Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have ...

163

Sandia National Laboratories Technologies Available for Licensing ...  

Wind Energy; Partners (27) Visual Patent Search; Success Stories; News; Events; Sandia National Laboratories Technologies Available for Licensing

164

Sandia National Laboratories : Licensing/Technology Transfer ...  

IP Home; Search/Browse Technology Portfolios; Licensing Overview; ... National Defense and Security; Molecular Spectroscopy; Imaging Array; Medical Imaging; Remote ...

165

Energy Storage Technologies Available for Licensing ...  

Energy Storage Technologies Available for Licensing U.S. Department of Energy laboratories and participating research institutions have energy storage ...

166

Industrial Technologies Available for Licensing - Energy ...  

Industrial Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have technologies ...

167

Biomass and Biofuels Technologies Available for Licensing ...  

Site Map; Printable Version; Share this resource. Send a link to Biomass and Biofuels Technologies Available for Licensing - Energy Innovation ...

168

Solar Photovoltaic Technologies Available for Licensing ...  

Site Map; Printable Version; Share this resource. Send a link to Solar Photovoltaic Technologies Available for Licensing - Energy Innovation Portalto ...

169

Geothermal Technologies Available for Licensing - Energy ...  

Geothermal Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating institutions research and develop ...

170

Ames Laboratory Technologies Available for Licensing - Energy ...  

Bookmark Ames Laboratory Technologies Available for Licensing - Energy Innovation Portal on Google; Bookmark Ames Laboratory Technologies Available ...

171

Sandia National Laboratories : Licensing/Technology Transfer  

Search; About Sandia; Mission Areas; Newsroom; Careers; Doing Business; Education; Contact Us; Licensing and Technology Transfer. IP Home; Search ...

172

Initial Assessment of Sulfur-Iodine Process Safety Issues and How They May Affect Pilot Plant Design and Operation  

DOE Green Energy (OSTI)

The sulfur-iodine process to make hydrogen by the thermochemical splitting of water is under active development as part of a U.S. Department of Energy program. An integrated lab scale system is currently being designed and built. The next planned stage of development is a pilot plant with a thermal input of about 500 kW, equivalent to about 30,000 standard liters per hour of hydrogen production. The sulfur-iodine process contains a variety of hazards, including temperatures up to 850 C and hazardous chemical species including SO2, H2SO4, HI, I2, and of course H2. The siting and design of a pilot plant must consider these and other hazards. This report presents an initial analysis of the hazards that might affect pilot plant design and should be considered in the initial planning. The general hazards that have been identified include reactivity, flammability, toxicity, pressure, electrical hazards, and industrial hazards such as lifting and rotating equipment. Personnel exposure to these hazards could occur during normal operations, which includes not only running the process at the design conditions but also initial inventory loading, heatup, startup, shutdown, and system flushing before equipment maintenance. Because of the complexity and severity of the process, these ancillary operations are expected to be performed frequently. In addition, personnel could be exposed to the hazards during various abnormal situations which could include unplanned phase changes of liquids or solids, leaks of process fluids or cooling water into other process streams, unintentional introducion of foreign species into the process, and unexpected side reactions. Design of a pilot plant will also be affected by various codes and regulations such as the International Building Code, the International Fire Code, various National Fire Protection Association Codes, and the Emergency Planning and Community Right-to-Know Act.

Robert S. Cherry

2006-09-01T23:59:59.000Z

173

Windows Server 2008 R2 Licensing Guide  

E-Print Network (OSTI)

Windows Server 2008 R2 Licensing Guide m Your Comprehensive Resource for Licensing and Pricing #12;2 Table of Contents Summary 3 Table of Windows Server 2008 R2 Core Product Offerings 3 License Terms ­ Windows Server 2008 R2 Product Line Updates 4 Edition Comparison by Server Role 5 New and Updated Features

Narasayya, Vivek

174

Review of export license applications (Strategic Trade Control...  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensing Nonproliferation & National Security (NPNS) Overview Technical Nonproliferation Policy Support Strategic Trade Control Review of export license applications Multilateral...

175

Executive Director for Operations UPDATE OF ISSUES RELATED TO NUCLEAR POWER REACTOR FINANCIAL QUALIFICATIONS IN RESPONSE TO RESTRUCTURING OF THE ELECTRIC UTILITY INDUSTRY  

E-Print Network (OSTI)

To provide the Commission with an update of electric utility deregulation and restructuring issues regarding the financial qualifications of power reactor licensees to operate their facilities safely. BACKGROUND: On October 24, 1997, the staff sent to the Commission SECY-97-253, "Policy Options for Nuclear Power Reactor Financial Qualifications in Response to Restructuring of the Electric Utility Industry. " In that paper, the staff discussed three options for the Commission's consideration regarding possible approaches that the NRC could use in assessing the financial qualifications of power reactor licensees to operate their plants safely. (The impact of deregulation and restructuring on decommissioning funding assurance is being addressed in a separate rulemaking, which was published in the Federal Register on September 10, 1997. A final rule is scheduled to be sent to the Commission by June 30, 1998.) In response to SECY-97-253, the Commission issued a staff requirements memorandum on January 15, 1998, and directed the staff to maintain the existing financial qualifications framework as discussed in Option 2 of SECY-97-253 and to "develop a coherent, efficient plan that would allow timely confirmation of the status of licensees (i.e., whether they meet the definition of 'electric utility')as deregulation actions are finalized by States. " In response, on April 16, 1998, the

L. Joseph Callan /s; Robert S. Wood

1998-01-01T23:59:59.000Z

176

Transportation Issues  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issues Issues and Resolutions - Compilation of Laboratory Transportation Work Package Reports Prepared for U.S. Department of Energy Used Fuel Disposition Campaign Compiled by Paul McConnell Sandia National Laboratories September 30, 2012 FCRD-UFD-2012-000342 Transportation Issues and Resolutions ii September 2012 Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. DISCLAIMER This information was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any

177

Commercialization and Licensing | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Success Stories Success Stories Commercialization and Licensing Economic Development Industrial Partnerships Sponsored Research Partnerships Home | Connect with ORNL | For Industry | Partnerships | Success Stories | Commercialization and Licensing Success Stories Commercialization and Licensing 1-10 of 14 Results Prev 12 Next DNP Green Technology, Inc. Exclusively Licenses Patents Invented at Argonne National Laboratory and Oak Ridge National Laboratory March 09, 2010 - On March 9, 2010, UT-Battelle, LLC, UChicago Argonne, LLC, and DNP Green Technology, INC fully executed an exclusive license agreement for patents invented solely by Argonne National Laboratory and jointly by Oak Ridge National Laboratory (ORNL) and Argonne National Laboratory (ANL). GE-Reuter Stokes to Market SNS-Designed Electronics

178

Full Issue  

E-Print Network (OSTI)

regulating commercial gun sales, banning guns in schools andso we regulate commercial gun sales. We do not want guns inthe commercial sales of firearms as such. Licensing of gun

UCLA, Law School

2011-01-01T23:59:59.000Z

179

Clean Fractionation: Technology Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

Clean Fractionation Clean Fractionation National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Offi ce of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. NREL/FS-7A1-43959 * October 2008 Printed with a renewable-source ink on paper containing at least 50% wastepaper, including 10% postconsumer waste. You'll find more technologies available for licensing on the NREL Technology Transfer Web site at www.nrel.gov/technologytransfer/. National Renewable Energy Laboratory Innovation for Our Energy Future Biorefinery production costs are driven Insolubles Wash Cellulose pulp Lignocellulosic feedstock Solubles

180

President Issues  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

President Issues President Issues Executive Order on Alternative Fuels On December 13, 1996, President Clinton signed Exec- utive Order 13031, which calls on each Federal agency to develop and implement ways to meet the alternative fuel vehicle (AFV) acquisition requirements of the Energy Policy Act (EPAct) of 1992. The executive order requires each agency to submit detailed reports within 60 days of the signing of the order to the Office of Management and Budget detailing its compliance with the EPAct sections regarding AFVs. Annual reports of the same nature must follow. "Our organization will care- fully track AFV acquisitions by the Federal agencies," said Phil Lampert, project coordinator at the National Ethanol Vehicle Coalition. "If the states can operate all these

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

COMMERICAL MOTOR VEHICLE OPERATOR EMPLOYMENT APPLICATION SUPPLEMENT  

E-Print Network (OSTI)

COMMERICAL MOTOR VEHICLE OPERATOR EMPLOYMENT APPLICATION SUPPLEMENT _________________________________________________________ Applicants for positions involving the operation of a commercial motor vehicle must comply with Title 49 CFR: _______________ Please list the following information for each unexpired commercial motor vehicle operator license

Roy, Subrata

182

License integration patterns: Addressing license mismatches in component-based development  

Science Conference Proceedings (OSTI)

In this paper we address the problem of combining software components with different and possibly incompatible legal licenses to create a software application that does not violate any of these licenses while potentially having its own. We call this ...

Daniel M. German; Ahmed E. Hassan

2009-05-01T23:59:59.000Z

183

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

Halbach Array DC Motor/Generator Company Name 1/7 TL0_____ Date PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT This Agreement between Lawrence Livermore National ...

184

Vehicles and Fuels Technologies Available for Licensing ...  

Site Map; Printable Version; Share this resource. Send a link to Vehicles and Fuels Technologies Available for Licensing - Energy Innovation Portalto ...

185

Wind Energy Technologies Available for Licensing - Energy ...  

Wind Energy Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have wind energy ...

186

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

Cross-Talk Free, Low-Noise Optical Amplifier Company Name 1/7 TL0_____ Date PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT This Agreement between ...

187

University of Colorado Technologies Available for Licensing ...  

Wind Energy; Partners (27) Visual Patent Search; Success Stories; News; Events; University of Colorado Technologies Available for Licensing The University of Colorado ...

188

PAID-UP NONEXCLUSIVE PATENT LICENSE AGREEMENT  

United States Department of Energy (DOE) Contract No. DE-AC52-07NA27344 to manage ... Sale, or import of the Licensed Products, performance of ...

189

Solar Thermal Technologies Available for Licensing - Energy ...  

Solar Thermal Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have concentrating solar power ...

190

Overview of the Yucca Mountain Licensing Process  

SciTech Connect

This paper presents an overview of the licensing process for a Yucca Mountain repository for high-level radioactive waste and spent nuclear fuel. The paper discusses the steps in the licensing proceeding, the roles of the participants, the licensing and hearing requirements contained in the Code of Federal Regulations. A description of the Nuclear Regulatory Commission (NRC) staff acceptance and compliance reviews of the Department of Energy (DOE) application for a construction authorization and a license to receive and possess high-level radioactive waste and spent nuclear fuel is provided. The paper also includes a detailed description of the hearing process.

M. Wisenburg

2004-05-03T23:59:59.000Z

191

Sandia National Laboratories : Licensing/Technology Transfer ...  

Search; About Sandia; Mission Areas; Newsroom; Careers; Doing Business; Education; Contact Us; IP Management, Alliances & Licensing Contacts. IP Home; Search/Browse ...

192

NREL: Technology Transfer - Technologies Available for Licensing  

NREL scientists and engineers produce breakthrough and award-winning renewable energy and energy efficiency technologies that are available for licensing.

193

Wind Energy Technologies Available for Licensing - Energy ...  

Site Map; Printable Version; Share this resource. Send a link to Wind Energy Technologies Available for Licensing - Energy Innovation Portalto someone by E-mail

194

Energy Storage Technologies Available for Licensing - Energy ...  

Energy Storage Technologies Available for Licensing U.S. Department of Energy laboratories and participating research institutions have energy storage technologies ...

195

Startup America Technologies Available for Licensing - Energy ...  

Startup America Technologies Available for Licensing Startup America is a White House initiative to celebrate, inspire, and accelerate high-growth ...

196

Commercialization and Licensing | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Exclusive Patent License for ORNL Graphite Foam Technology January 28, 2010 - Light-emitting diode (LED) lamps are increasingly in demand in industrial and commercial...

197

Non-exclusive License: AGMT-XXXX  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. DEPARTMENT OF ENERGY NATIONAL ENERGY TECHNOLOGY LABORATORY NON-EXCLUSIVE PATENT LICENSE AGREEMENT This Agreement is by and between the United States Department of...

198

Exclusive Patent License Agreement between Alliance and ...  

In such event, Alliance shall be free to license such rights to third parties without further obligation to Licensee. 8.5 Alliance agrees, ...

199

Three essays on licensing university inventions  

E-Print Network (OSTI)

of inventor(s), invention title, disclosure date, patent andphases: Phase 1 - Inventions Disclosure. The invention isDiego regarding the disclosure of inventions and licensing

Munteanu, Radu

2007-01-01T23:59:59.000Z

200

Advanced Materials Technologies Available for Licensing - Energy ...  

Advanced Materials Technologies Available for Licensing U.S. Department of Energy (DOE) laboratories and participating research institutions have advanced materials ...

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Geothermal Technologies Available for Licensing - Energy ...  

Site Map; Printable Version; Share this resource. Send a link to Geothermal Technologies Available for Licensing - Energy Innovation Portalto someone by E-mail

202

Nondestructive Evaluation: Update on License Renewal One Time Inspection and Best NDE Practices  

Science Conference Proceedings (OSTI)

As nuclear plants enter long-term operations beyond 40 years with extended licenses, nondestructive evaluation (NDE) becomes increasingly important. This is especially true for plants that are going through the license renewal process. Many of the commitments made by more than 100 plants have submitted applications that include identification of systems, structures, and components for one-time inspection (OTI) based on suitable NDE techniques. This report provides an example of such inspection and the as...

2011-11-02T23:59:59.000Z

203

License  

E-Print Network (OSTI)

This report documents the program and the outcomes of Dagstuhl Seminar 11181 Organic Computing Design of Self-Organizing Systems.

Kirstie Bellman; Andreas Herkersdorf; Michael G. Hinchey; Tu Mnchen De; Andreas Herkersdorf; Mike Hinchey; Christian Mller-schloer; Hartmut Schmeck; Rolf Wrtz; Kirstie Bellman; Andreas Herkersdorf; Mike Hinchey; Christian Mller-schloer; Hartmut Schmeck; Rolf Wrtz

2011-01-01T23:59:59.000Z

204

License  

E-Print Network (OSTI)

EWF is short for Expert Witness Compression Format, according to [ASR02]. It is a file type used to store media images for forensic purposes. It is currently widely used in the field of computer forensics in proprietary tooling like EnCase en FTK. The original specification of the format is provided by ASRDATA, for the SMART application. This document is intended as a working document for the EWF specification. Which should allow existing Open Source forensic tooling to be able to process this file type. page iDocument information Author(s):

Joachim Metz; Joachim Metz

2006-01-01T23:59:59.000Z

205

Public Comments on the proposed 10 CFR Part 51 rule for renewal of nuclear power plant operating licenses and supporting documents: Review of concerns and NRC staff response. Appendices  

SciTech Connect

This volume contains several appendices. Appendix A contains the list of individuals and organizations providing comments at various stages of the rulemaking process. The names of commenters at the public meetings are listed in the order that they spoke at the meeting; those who submitted written comments are listed by docket number. Appendix B contains the summaries of comments made. Each comment summary is identified by a unique comment number. Appendix C presents the concerns and NRC staff responses. Each concern embodies one or more comments on similar or related issues. The associated comment numbers are referenced for each concern. The concerns are organized by topic areas. A three-letter identifier for the topic, followed by a number, is assigned to each concern.

NONE

1996-05-01T23:59:59.000Z

206

Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Liquefied Petroleum Liquefied Petroleum Gas (Propane) License to someone by E-mail Share Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Facebook Tweet about Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Twitter Bookmark Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Google Bookmark Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Delicious Rank Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on Digg Find More places to share Alternative Fuels Data Center: Liquefied Petroleum Gas (Propane) License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Liquefied Petroleum Gas (Propane) License

207

Solar/Wind Contractor Licensing | Open Energy Information  

Open Energy Info (EERE)

Solar/Wind Contractor Licensing Solar/Wind Contractor Licensing < Solar Jump to: navigation, search Some states have established a licensing process for solar-energy contractors and/or wind-energy contractors. These requirements are designed to ensure that contractors have the necessary knowledge and experience to install systems properly. Solar licenses typically take the form of either a separate, specialized solar contractor's license, or a specialty classification under a general electrical or plumbing license. [1] Solar/Wind Contractor Licensing Incentives CSV (rows 1 - 24) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active Alternative Energy System Contracting (Virginia) Solar/Wind Contractor Licensing Virginia Installer/Contractor Photovoltaics No

208

READY-TO-SIGN NONEXCLUSIVE PATENT LICENSE AGREEMENT  

Bullet Detection Tracking and Stopping System Company Name 1/7 TL0_____ Date READY-TO-SIGN NONEXCLUSIVE . PATENT LICENSE AGREEMENT . This license agreement ...

209

Solar and Wind Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Heating Program Information Louisiana Program Type SolarWind Contractor Licensing All solar and wind energy installations must be performed by a contractor duly licensed by and...

210

LAWRENCE LIVERMORE NATIONAL LABORATORY OVERVIEW OF LLNL LICENSE ...  

one or more fields of use. ... c. Security and energy conservation; d. ... Number of Licenses Total Cost for All Licenses 1 $100,000

211

Ready-to-Sign Licensing Instructions - Industrial Partnerships ...  

Ready-to-Sign Licensing Instructions. Read the Notice for RTS License Agreement and complete Commercialization Information Form; Select a technology from the patents ...

212

Argonne TDC: Licensing Intellectual Property from Argonne National...  

NLE Websites -- All DOE Office Websites (Extended Search)

Property from Argonne National Laboratory Argonne's licensing program provides companies with opportunities to acquire rights in Argonne inventions and copyrights. Licenses...

213

Threatened and endangered species evaluation for 75 licensed commercial nuclear power generating plants  

SciTech Connect

The Endangered Species Act (ESA) of 1973, as amended, and related implementing regulations of the jurisdictional federal agencies, the U.S. Departments of Commerce and Interior, at 50 CFR Part 17. 1, et seq., require that federal agencies ensure that any action authorized, funded, or carried out under their jurisdiction is not likely to jeopardize the continued existence of any threatened or endangered species or result in the destruction or adverse modification of critical habitats for such species. The issuance and maintenance of a federal license, such as a construction permit or operating license issued by the U.S. Nuclear Regulatory Commission (NRC) for a commercial nuclear power generating facility is a federal action under the jurisdiction of a federal agency, and is therefore subject to the provisions of the ESA. The U.S. Department of the Interior (through the Fish and Wildlife Service), and the U.S. Department of Commerce, share responsibility for administration of the ESA. The National Marine Fisheries Service (NMFS) deals with species that inhabit marine environments and anadromous fish, while the U.S. Fish and Wildlife Service (USFWS) is responsible for terrestrial and freshwater species and migratory birds. A species (or other distinct taxonomic unit such as subspecies, variety, and for vertebrates, distinct population units) may be classified for protection as `endangered` when it is in danger of extinction within the foreseeable future throughout all or a significant portion of its range. A `threatened` classification is provided to those animals and plants likely to become endangered within the foreseeable future throughout all or a significant portion of their ranges. As of February 1997, there were about 1067 species listed under the ESA in the United States. Additionally there were approximately 125 species currently proposed for listing as threatened or endangered, and another 183 species considered to be candidates for formal listing proposals.

Sackschewsky, M.R.

1997-03-01T23:59:59.000Z

214

Technology Transfer: Success Stories: Licensed Technologies  

NLE Websites -- All DOE Office Websites (Extended Search)

Licensed Technologies Licensed Technologies Here are some of our licensees and the technologies they are commercializing; see our Start-Up Company page for more of our technology licenses. Company (Licensee) Technology Life Technologies Corp. Cell lines for breast cancer research Bristol Myers Squibb; Novartis; Plexxikon Inc.; Wyeth Research; GlaxoSmithKline; Johnson & Johnson; Boehringer Ingelheim Pharmaceuticals, Inc.; Genzyme Software for automated macromolecular crystallography Shell International Exploration and Production; ConnocoPhillips Company; StatOil ASA; Schlumburger Technology Corportation; BHP Billiton Ltd.; Chevron Energy Technology Company; EniTecnologie S.p.A. Geo-Hydrophysical modeling software Microsoft Home Energy Saver software distribution Kalinex Colorimetric bioassay

215

Licensed reactor nuclear safety criteria applicable to DOE reactors  

SciTech Connect

The Department of Energy (DOE) Order DOE 5480.6, Safety of Department of Energy-Owned Nuclear Reactors, establishes reactor safety requirements to assure that reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that adequately protects health and safety and is in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. This document identifies nuclear safety criteria applied to NRC (Nuclear Regulatory Commission) licensed reactors. The titles of the chapters and sections of USNRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, Rev. 3, are used as the format for compiling the NRC criteria applied to the various areas of nuclear safety addressed in a safety analysis report for a nuclear reactor. In each section the criteria are compiled in four groups: (1) Code of Federal Regulations, (2) US NRC Regulatory Guides, SRP Branch Technical Positions and Appendices, (3) Codes and Standards, and (4) Supplemental Information. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor.

Not Available

1991-04-01T23:59:59.000Z

216

Monticello Lead Plant License Renewal Project Summary Report  

Science Conference Proceedings (OSTI)

This report summarizes license renewal evaluation activities from the Monticello Lead Plant License Renewal Project (MLP Project) that were conducted between October 1988 and December 1992. The lessons learned during this first plant-specific license renewal evaluation provide valuable information that utilities can use when initiating a license renewal effort.

1996-10-06T23:59:59.000Z

217

Invention to License: The Tech Transfer Process  

NLE Websites -- All DOE Office Websites (Extended Search)

Invention to License: The Tech Transfer Process Speaker(s): Michael Mueller Robin C. Chiang Date: November 14, 2013 - 12:00pm - 1:00pm Location: 90-3122 Seminar HostPoint of...

218

Argument licensing and agreement in Zulu  

E-Print Network (OSTI)

In this thesis, I examine some core grammatical phenomena - case licensing, agreement, the EPP - through the lens of the Bantu language Zulu. Zulu has a number of remarkable and puzzling properties whose analysis affords ...

Halpert, Claire

2012-01-01T23:59:59.000Z

219

Technologies Recently Available for Licensing - 1999  

DOE Green Energy (OSTI)

An NREL Technology Transfer fact sheet describing four technologies that are available for licensing: steel weld weakness detection, cadmium telluride solar cell enhancement, HOMER model for choosing optimal electrical systems for remote areas, and inner-flame matrix burner.

Brown, H.; Touryan, K.

1999-09-07T23:59:59.000Z

220

Alternative Fuels Data Center: Biodiesel Distributor License and  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Distributor Distributor License and Recordkeeping Requirements to someone by E-mail Share Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Facebook Tweet about Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Twitter Bookmark Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Google Bookmark Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Delicious Rank Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on Digg Find More places to share Alternative Fuels Data Center: Biodiesel Distributor License and Recordkeeping Requirements on AddThis.com... More in this section...

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Solar Hot Water Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hot Water Contractor Licensing Hot Water Contractor Licensing Solar Hot Water Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Arkansas Program Type Solar/Wind Contractor Licensing Arkansas offers several limited, specialty licenses for solar thermal installers under the general plumbing license. There are three specialty classifications available for solar thermal installers: a Restricted Solar Mechanic license, a Supervising Solar Mechanic license, and a Solar Mechanic Trainee classification. Installers with a Restricted Solar Mechanic license can install and maintain systems used to heat domestic hot water, but are not allowed to perform any other plumbing work. Individuals holding a Supervising Solar Mechanic license are able to supervise, install

222

The Brazilian Audit Tribunal's role in improving the federal environmental licensing process  

SciTech Connect

This article describes the role played by the Brazilian Audit Tribunal (Tribunal de Contas da Uniao - TCU) in the external auditing of environmental management in Brazil, highlighting the findings of an operational audit conducted in 2007 of the federal environmental licensing process. Initially, it records the constitutional and legal framework of Brazilian environmental licensing, describing the powers and duties granted to federal, state and municipal institutions. In addition, it presents the responsibilities of the TCU in the environmental area, comparing these with those of other Supreme Audit Institutions (SAI) that are members of the International Organization of Supreme Audit Institutions (INTOSAI). It also describes the work carried out in the operational audit of the Brazilian environmental licensing process and its main conclusions and recommendations. Finally, it draws a parallel between the findings and recommendations made in Brazil with those of academic studies and audits conducted in other countries.

Lima, Luiz Henrique, E-mail: luizhlima@terra.com.b [Rio de Janeiro Federal University, Alberto Luiz Coimbra Postgraduate Institute of Engineering Research, Energy Planning Program (Brazil); Magrini, Alessandra, E-mail: ale@ppe.ufrj.b [Rio de Janeiro Federal University, Alberto Luiz Coimbra Postgraduate Institute of Engineering Research, Energy Planning Program (Brazil); Centro de Tecnologia - Bloco C Sala 211, Ilha do Fundao, 21949-900 - Rio de Janeiro, Caixa-Postal: 68565, RJ (Brazil)

2010-02-15T23:59:59.000Z

223

Effects of delaying the operation of a nuclear power plant  

Science Conference Proceedings (OSTI)

This report documents a study of an actual 24-month nuclear power plant licensing delay. A representative utility was chosen for examination. The research was oriented toward determination of the licensing delay's impact on the utility's operating results, ratepayers, and security issues. The methodology utilized to estimate those impacts involved the recursive interaction of a generation costing program to estimate replacement fuel costs and a financial regulatory model to concomitantly determine the impact on the utility, its ratepayers and security issues. The latter model was executed under six alternate scenarios: (1) no delay in the plant's operation; (2) a 24-month delay; (3) a 24-month delay but further assuming all replacement power was generated by coal-fired plants; (4) a 24-month delay assuming all replacement power from oil-fired plants; (5) no delay but assuming the capital cost of the plant was twice as large; and (6) a 24-month delay with the capital cost of the plant twice as large. Three primary conclusions were made. First, under all scenarios, a 24-month delay in operation of the plant has an adverse impact on the utility's internal generation of funds. Second, although electricity rates are not appreciably affected by the delay, the direction of electricity price changes is contingent on the source of fuel used for replacement power. Finally, a 24-month delay has an adverse impact on the indicators used to evaluate the financial soundness of the utility in all cases under consideration.

Hill, L.J.; Rainey, J.A.; Tepel, R.C.; Van Dyke, J.W.

1983-12-01T23:59:59.000Z

224

BLACK ISSUES  

E-Print Network (OSTI)

BLACK ISSUES :: Your Portal To Diversity :: ::::::::::::::::::::::::::: http transactions in recent years include Viacom's acquisition of Black Entertainment Television, NBC's purchase Bookshelf Events Tech Briefs - more - #12;BLACK ISSUES :: Your Portal To Diversity

Valero-Cuevas, Francisco

225

Nuclear Power Plant License Renewal Environmental Life Cycle Management Plan Manual: License Renewal Environmental Compliance  

Science Conference Proceedings (OSTI)

This manual focuses on preparing to meet NRC environmental requirements for license renewal. It describes a nuclear power plant's day-to-day environmental protection activities and the relationship between these activities and a plan for preparing a license renewal environmental report supplement.

1995-06-01T23:59:59.000Z

226

T-564: Vulnerabilities in Citrix Licensing administration components |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Vulnerabilities in Citrix Licensing administration 4: Vulnerabilities in Citrix Licensing administration components T-564: Vulnerabilities in Citrix Licensing administration components February 24, 2011 - 7:00am Addthis PROBLEM: Vulnerabilities in Citrix Licensing administration components. PLATFORM: Citrix Licensing Administration Console, formerly known as the License Management Console. ABSTRACT: The vulnerabilities impact all current versions of the Citrix Licensing Administration Console, formerly known as the License Management Console. reference LINKS: Citrix ID:CTX128167 SecurityTracker Alert ID:1025123 Citrix Support IMPACT ASSESSMENT: Medium Discussion: Citrix has been made aware of a number of vulnerabilities in a third-party component that is used by the Citrix Licensing administration console. These vulnerabilities could potentially allow an unauthorized user to gain

227

Alternative Fuels Data Center: Natural Gas and Propane Retailer License  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Retailer License to someone by E-mail Retailer License to someone by E-mail Share Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Facebook Tweet about Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Twitter Bookmark Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Google Bookmark Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Delicious Rank Alternative Fuels Data Center: Natural Gas and Propane Retailer License on Digg Find More places to share Alternative Fuels Data Center: Natural Gas and Propane Retailer License on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Natural Gas and Propane Retailer License Compressed natural gas, liquefied natural gas, or liquefied petroleum gas

228

Long-Term Operations Program: Assessment of Research and Development Supporting Aging Management Programs for Long-Term Operation  

Science Conference Proceedings (OSTI)

Presently, U.S. nuclear utilities and the Nuclear Regulatory Commission (NRC) are discussing a second round of plant license renewals, termed subsequent license renewal (SLR). For the U.S. plants this could mean extending a plants operating license from 60 years to 80. To achieve safe and reliable operation for such an extended period will require a comprehensive technical understanding of aging degradation effects on nuclear plant systems, structures, and components (SSCs). EPRI ...

2013-08-29T23:59:59.000Z

229

VERMONT YANKEE NUCLEAR POWER STATION- NRC LICENSE  

E-Print Network (OSTI)

your application for a renewed license of your Vermont Yankee Nuclear Power Station. The enclosed report documents the result of the inspection which was discussed with members of your staff on May 24, 2007, at a publicly observed exit meeting conducted at the Latchis Theater in Brattleboro, VY. The purpose of this inspection was to examine the plant activities and documents that supported the application for a renewed license of the Vermont Yankee Nuclear Power Station. The inspection reviewed the screening and scoping of non-safety related systems, structures, and components, as required in 10 CFR 54.4(a)(2), and determined whether the proposed aging management programs are capable of reasonably managing the effects of aging. These NRC inspection activities constitute one of several inputs into the NRC review process for license renewal applications. The inspection team concluded screening and scoping of nonsafety-related systems, structures, and components, were implemented as required in 10 CFR 54.4(a)(2), and the aging management portions of the license renewal activities were conducted as described in the License Renewal Application. The inspection results supported a conclusion that the

Mr. Theodore; A. Sullivan

2007-01-01T23:59:59.000Z

230

Cogeneration : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.  

Science Conference Proceedings (OSTI)

This guidebook focuses on cogeneration development. It is one of a series of four guidebooks recently prepared to introduce the energy developer to the federal, state and local agencies that regulate energy facilities in Idaho, Montana, Oregon, and Washington (the Bonneville Power Administration Service Territory). It was prepared specifically to help cogeneration developers obtain the permits, licenses and approvals necessary to construct and operate a cogeneration facility. The regulations, agencies and policies described herein are subject to change. Changes are likely to occur whenever energy or a project becomes a political issue, a state legislature meets, a preexisting popular or valuable land use is thought threatened, elected and appointed officials change, and new directions are imposed on states and local governments by the federal government. Accordingly, cogeneration developers should verify and continuously monitor the status of laws and rules that might affect their plans. Developers are cautioned that the regulations described herein may only be a starting point on the road to obtaining all the necessary permits.

Deshaye, Joyce; Bloomquist, R. Gordon

1992-12-01T23:59:59.000Z

231

Inspection of the Department`s export licensing process for dual-use and munitions commodities  

Science Conference Proceedings (OSTI)

The purpose of our inspection was to review the Department of Energy`s (Energy) export licensing process for dual-use and military (munitions) commodities subject to nuclear nonproliferation controls. Specifically, we reviewed Energy`s authorities, procedures, and policies pertaining to the export licensing process and examined procedures for safeguarding data transmitted between Energy and other agencies involved in the export licensing process. We also reviewed Energy`s role as a member of the Subgroup on Nuclear Export Coordination. Our review of the sample of 60 export cases did not find evidence to lead us to believe that Energy`s recommendations for these cases were inappropriate or incorrect. We identified, however, problems regarding management systems associated with the export license review process. We found that without documentation supporting export licensing decisions by the Export Control Operations Division (ECOD), we could not determine whether ECOD analysts considered all required criteria in their review of export cases referred to Energy. For example, we found that the ECOD did not retain records documenting the bases for its advice, recommendations, or decisions regarding its reviews of export license cases or revisions to lists of controlled commodities and, therefore, was not in compliance with certain provisions of the Export Administration Act, as amended, and Energy records management directives. Additionally, we found that the degree of compliance by Energy with the export licensing review criteria contained in the Export Administration Regulations and the Nuclear Non-Proliferation Act of 1978 could not be determined because ECOD did not retain records documenting the bases for its advice and recommendations on export cases.

Not Available

1993-08-10T23:59:59.000Z

232

Seismic Analysis Issues in Design Certification Applications for New Reactors  

SciTech Connect

The licensing framework established by the U.S. Nuclear Regulatory Commission under Title 10 of the Code of Federal Regulations (10 CFR) Part 52, Licenses, Certifications, and Approvals for Nuclear Power Plants, provides requirements for standard design certifications (DCs) and combined license (COL) applications. The intent of this process is the early reso- lution of safety issues at the DC application stage. Subsequent COL applications may incorporate a DC by reference. Thus, the COL review will not reconsider safety issues resolved during the DC process. However, a COL application that incorporates a DC by reference must demonstrate that relevant site-specific de- sign parameters are within the bounds postulated by the DC, and any departures from the DC need to be justified. This paper provides an overview of several seismic analysis issues encountered during a review of recent DC applications under the 10 CFR Part 52 process, in which the authors have participated as part of the safety review effort.

Miranda, M.; Morante, R.; Xu, J.

2011-07-17T23:59:59.000Z

233

Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.  

DOE Green Energy (OSTI)

The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

McCoy, Gilbert A.

1992-12-01T23:59:59.000Z

234

Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.  

DOE Green Energy (OSTI)

The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

McCoy, Gilbert A.

1992-12-01T23:59:59.000Z

235

ENVIRONMENTAL ASSESSMENT FOR HYDROPOWER PILOT PROJECT LICENSE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR HYDROPOWER PILOT PROJECT LICENSE Admiralty Inlet Pilot Tidal Project-FERC Project No. 12690-005 (DOE/EA-1949) Washington Federal Energy Regulatory Commission Office of Energy Projects Division of Hydropower Licensing 888 First Street, NE Washington, DC 20426 U.S. Department of Energy Office of Energy Efficiency and Renewable Energy 1617 Cole Boulevard Golden, Colorado 80401 January 15, 2013 20130115-3035 FERC PDF (Unofficial) 01/15/2013 i TABLE OF CONTENTS LIST OF FIGURES ............................................................................................................ iv LIST OF TABLES............................................................................................................... v EXECUTIVE SUMMARY ................................................................................................

236

Total System Performance Assessment - License Application Methods and Approach  

Science Conference Proceedings (OSTI)

''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

J. McNeish

2003-12-08T23:59:59.000Z

237

Total System Performance Assessment-License Application Methods and Approach  

SciTech Connect

''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issue (KTI) agreements, the ''Yucca Mountain Review Plan'' (CNWRA 2002 [158449]), and 10 CFR Part 63. This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are utilized in this document.

J. McNeish

2002-09-13T23:59:59.000Z

238

Advanced Reactor Licensing: Experience with Digital I&C Technology in Evolutionary Plants  

Science Conference Proceedings (OSTI)

This report presents the findings from a study of experience with digital instrumentation and controls (I&C) technology in evolutionary nuclear power plants. In particular, this study evaluated regulatory approaches employed by the international nuclear power community for licensing advanced l&C systems and identified lessons learned. The report (1) gives an overview of the modern l&C technologies employed at numerous evolutionary nuclear power plants, (2) identifies performance experience derived from those applications, (3) discusses regulatory processes employed and issues that have arisen, (4) captures lessons learned from performance and regulatory experience, (5) suggests anticipated issues that may arise from international near-term deployment of reactor concepts, and (6) offers conclusions and recommendations for potential activities to support advanced reactor licensing in the United States.

Wood, RT

2004-09-27T23:59:59.000Z

239

Regression analysis of oncology drug licensing deal values  

E-Print Network (OSTI)

This work is an attempt to explain wide variations in drug licensing deal value by using regression modeling to describe and predict the relationship between oncology drug deal characteristics and their licensing deal ...

Hawkins, Paul Allen

2006-01-01T23:59:59.000Z

240

Multiple clues for license plate detection and recognition  

Science Conference Proceedings (OSTI)

This paper addresses a license plate detection and recognition (LPR) task on still images of trucks. The main contribution of our LPR system is the fusion of different segmentation algorithms used to improve the license plate detection. We also compare ...

Pablo Negri; Mariano Tepper; Daniel Acevedo; Julio Jacobo; Marta Mejail

2010-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Alternative Fuels Data Center: License Exemptions for Biodiesel Production  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

License Exemptions for License Exemptions for Biodiesel Production for Personal Use to someone by E-mail Share Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Facebook Tweet about Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Twitter Bookmark Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Google Bookmark Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Delicious Rank Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on Digg Find More places to share Alternative Fuels Data Center: License Exemptions for Biodiesel Production for Personal Use on AddThis.com...

242

Y-12 cleaning technology licensed by Knoxville engineering firm...  

National Nuclear Security Administration (NNSA)

cleaning technology licensed by Knoxville engineering firm | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the...

243

Hydrogen and Fuel Cell Technologies Available for Licensing ...  

... Energy Innovation Portal on Google; Bookmark Hydrogen and Fuel Cell Technologies Available for Licensing - Energy Innovation Portal on Delicious ...

244

SAS4A/SASSYS-1 Commercial Software License Agreement  

Licensed Program is furnished is free of manufacturing defects and damage provided that themedia has been properly installed by Licensee.

245

Oil and Water Dispersion Technology Licensing Opportunity  

E-Print Network (OSTI)

Oil and Water Dispersion Technology Licensing Opportunity Technology Brief Professor Richard can be achieved by the process of degassing. The removal of dissolved gas, for example in oil dispersions. While laboratory scale degassing is predominantly batch processed and time consuming, Professor

246

NRC LICENSE RENEWAL SCOPING/SCREENING INSPECTION  

E-Print Network (OSTI)

Dear Mr. Nazar: On May 21, 2004, the NRC completed an inspection regarding the application for license renewal for the D. C Cook Nuclear Plant. The enclosed report documents the inspection results, which were discussed with members of your staff. The purpose of this inspection was an examination of activities that support the application for a renewed license for D. C. Cook. The inspection consisted of a selected examination of procedures and representative records, and interviews with personnel regarding the process of scoping and screening plant equipment to select equipment subject to an aging management review. The inspection concluded that the scoping and screening portion of license renewal activities was conducted as described in the License Renewal Application and that documentation supporting the application is in an auditable and retrievable form. With the exception of the items identified in this report, your scoping and screening process was successful in identifying those systems, structures, and components required to be considered for aging management. In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice, " a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at

Cynthia D. Pederson; M. Finissi; Plant Manager; G. White; Michigan Public; Service Commission

2004-01-01T23:59:59.000Z

247

Business Ymwet Centlsaem: Enclosed is AEC Special Nuclear Material License Yo. SW-551, as  

Office of Legacy Management (LM)

c-ii 3-y c-ii 3-y !WL?DF!i 70.424 SW-551, 9s renewed AUG 9 196s cmhustian En&merin~, Inc. %.lelcar Division tYindter, Connecticut ,~ttentionr ?tr. 5. ff. Shfp,penbmg: Business Ymwet Centlsaem: Enclosed is AEC Special Nuclear Material License Yo. SW-551, as renewed. Very tTuly yours, fkmald A. Nusshauaer, Chief Saurce 4 Specfel Wcleer Yaterials Brmch Ofvision of Meterbls Licensing EnClOSUWl W W m , as renwed DISTRIBUTION: Ccaplianee, HQs 2 w/encl. H. j. McAlduff, OR00 w/encl. D. George, ?MM w/mcl. N. Dtilos, ML w/emCl, C. Luke, ML w/end. Br. RF w/encl. Div. RF w/o encl. UNITED STATES ATOMIC ENERGY COMMISSION SPECIAL NUCLEAR MATERIAL LICENSE Pursuant to the Atomic Energy Act of 1954 and Title 10, Code of Federal Regulations, Chapter 1, Part 70, "Special Nuclear Material Regulations," a license is hereby issued authorizing the licensee

248

Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 12  

Science Conference Proceedings (OSTI)

Supplement No. 12 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation of (1) additional information submitted by the applicant since Supplement No. 11 was issued, and (2) matters that the staff had under review when Supplement No. 11 was issued.

Tam, P.S.

1993-10-01T23:59:59.000Z

249

Software License Agreement | Scientific and Technical Information Program  

Office of Scientific and Technical Information (OSTI)

License Agreement License Agreement Print page Print page Email page Email page U.S. Department of Energy Office of Scientific and Technical Information Energy Science and Technology Software Center As the Office of Scientific and Technical Information's (OSTI) Energy Science and Technology Software Center (ESTSC), we are authorized to license and distribute this software to you. Upon receipt of license fee and execution of this license, the herein identified computer software package (software and accompanying documentation) is licensed, on a non-exclusive basis, to the UNDERSIGNED for use ONLY at the site designated herein below, and is to be used in accordance with this license and with the special restrictions identified below or on the software package. DOE-funded modifications, enhancements, or conversions of this

250

DOE NETL Intellectual Property Available for Licensing  

NLE Websites -- All DOE Office Websites (Extended Search)

18.12 18.12 DOE NETL Intellectual Property Available for Licensing Complete marketing summaries of the following technologies will be posted on the NETL Available Technologies page shortly. For additional information or to submit a license application, please contact techtransfer@netl.doe.gov. Technology Title and Brief Description Intellectual Property Status Metal oxide promoters for improving the reactivity and capacity of oxygen carriers for the chemical looping combustion process This invention provides an oxygen carrier comprised of a plurality of metal oxide particles in contact with a plurality of MgO promoter particles. The MgO promoter particles increase the reaction rate and oxygen utilization of the metal oxide when contacting with a gaseous hydrocarbon at a temperature greater than

251

NRC antitrust licensing actions, 1978--1996  

Science Conference Proceedings (OSTI)

NUREG-0447, Antitrust Review of Nuclear Power Plants, was published in May 1978 and includes a compilation and discussion of U.S. Nuclear Regulatory Commission (NRC) proceedings and activity involving the NRC`s competitive review program through February 1978, NUREG-0447 is an update of an earlier discussion of the NRC`s antitrust review of nuclear power plants, NR-AIG-001, The US Nuclear Regulatory Commission`s Antitrust Review of Nuclear Power Plants: The Conditioning of Licenses, which reviewed the Commission`s antitrust review function from its inception in December 1970 through April 1976. This report summarizes the support provided to NRC staff in updating the compilation of the NRC`s antitrust licensing review activities for commercial nuclear power plants that have occurred since February 1978. 4 refs., 4 tabs.

Mayer, S.J.; Simpson, J.J.

1997-09-01T23:59:59.000Z

252

Licensing : BioEnergy Science Center  

NLE Websites -- All DOE Office Websites (Extended Search)

Available for Licensing Available for Licensing As new inventions are disclosed from BESC researchers, we will post information about the inventions on this webpage. Use the search engine below to match your technology needs with BESC disclosures or view all technologies in a particular category by clicking on the category below. View all inventions Enter keywords in the box. Separate the words with a comma (,) for multiple keywords. GO Advanced Biofuels (1 Inventions) Bioconversion (2 Inventions) Biomass Grasses (7 Inventions) Trees (1 Inventions) Genetic Tools (9 Inventions) Biotechnology (9 Inventions) Imaging (2 Inventions) PreTreatment (2 Inventions) Adams, Michael A (2 Inventions) Albersheim, Ivana G. (1 Invention) Backe, Jason (1 Invention) Bar-Peled, Maor (1 Invention) Bhave, Ramesh R (2 Inventions)

253

Open Issues  

NLE Websites -- All DOE Office Websites (Extended Search)

Open Issues Open Issues Open Issues [PATCHED] python/2.7.4 gzip package fails September 24, 2013 by Doug Jacobsen | 0 Comments The modules version of python (python/2.7.4) had a bug in the default gzip python package. This was due to problems introduced in python 2.7.4 and fixed in python 2.7.5. Receiving a TypeError or structError upon opening and reading a gzip'ped file were the phenotypes of this bug. This has been corrected by installing the python 2.7.5 version of gzip.py into our python distribution. 0 comments | Read the full post [FIXED] JGI data loss in /projectb/sandbox area [purge] August 19, 2013 by Kjiersten Fagnan | 0 Comments We have discovered a serious bug in our purge scripts on /global/projectb. The */global/projectb/sandbox* areas are supposed to be immune from the

254

Open Issues  

NLE Websites -- All DOE Office Websites (Extended Search)

Open Issues Open Issues Open Issues "error while loading shared libraries: libalpslli.so.0" with serial codes on login nodes December 13, 2013 by Helen He | 0 Comments Symptom: Dynamic executables built with compiler wrappers running directly on the external login nodes are getting the following error message: 0 comments | Read the full post Resolved: Running jobs error: "inet_arp_address_lookup" September 22, 2013 by Helen He | 0 Comments Symptom: After the Hopper August 14 maintenance, users reporting get the error message similar as follows occassionaly: 0 comments | Read the full post Resolved: qstat -a does not show correct hours in elpsed time for running jobs July 12, 2013 by Helen He | 0 Comments Sympton: After the Torque/Moab upgrade on 6/19, the elapsed run time display from

255

Plant maintenance and advanced reactors issue, 2004  

SciTech Connect

The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Optimism about the future of nuclear power, by Ruth G. Shaw, Duke Power Company; Licensed in three countries, by GE Energy; Enhancing public acceptance, by Westinghouse Electric Company; Standardized MOV program, by Ted Neckowicz, Exelon; Inservice testing, by Steven Unikewicz, U.S. Nuclear Regulatory Commission; Asian network for education, Fatimah Mohd Amin, Malaysian Institute for Nuclear Technology Research; and, Cooling water intake optimization, by Jeffrey M. Jones and Bert Mayer, P.E., Framatome ANP.

Agnihotri, Newal (ed.)

2004-09-15T23:59:59.000Z

256

Interconnect Issues  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interconnect Issues in NE Serge Khalife, 15 th April 2010 Agenda  About National Grid and Service territories  Scope and definitions  Interconnection Process Overview  Time Frames and Fees  Governmental Entity Exceptions  Net Metering Limit  Technical Issues  Observations and recommendations  Questions and Answers Service Territories Map Scope and definitions  The Distributed Generation Group at National Grid process interconnection applications on the distribution system typically 10 MW and under with a few exceptions.  ISO-NE process larger interconnection applications on the transmission system. Their timelines and procedures vary from National Grid's Distributed Generation process.  Governmental Entity : The Commonwealth of Massachusetts, or any

257

Carbonaceous Chemistry for Computational Modeling Licensing and Partnership Opportunity  

NLE Websites -- All DOE Office Websites (Extended Search)

Chemistry for Computational Modeling Chemistry for Computational Modeling Opportunity The Department of Energy's National Energy Technology Laboratory (NETL) has developed a software platform entitled Carbonaceous Chemistry for Computational Modeling (C3M) that is used to access a variety of kinetic processes and reaction mechanisms typically found in coal gasification, gas clean-up, and carbon capture processes. This unique software provides the user the ability to conduct virtual kinetic experiments using leading kinetic packages and available experimental data to evaluate kinetic predictions as a function of fuel and sorbent type and/or operating conditions. A Patent Cooperation Treaty application was filed in June 2008. NETL is seeking non-exclusive licensing partners interested in implementing

258

Sensor network based vehicle classification and license plate identification system  

Science Conference Proceedings (OSTI)

Typically, for energy efficiency and scalability purposes, sensor networks have been used in the context of environmental and traffic monitoring applications in which operations at the sensor level are not computationally intensive. But increasingly, sensor network applications require data and compute intensive sensors such video cameras and microphones. In this paper, we describe the design and implementation of two such systems: a vehicle classifier based on acoustic signals and a license plate identification system using a camera. The systems are implemented in an energy-efficient manner to the extent possible using commercially available hardware, the Mica motes and the Stargate platform. Our experience in designing these systems leads us to consider an alternate more flexible, modular, low-power mote architecture that uses a combination of FPGAs, specialized embedded processing units and sensor data acquisition systems.

Frigo, Janette Rose [Los Alamos National Laboratory; Brennan, Sean M [Los Alamos National Laboratory; Rosten, Edward J [Los Alamos National Laboratory; Raby, Eric Y [Los Alamos National Laboratory; Kulathumani, Vinod K [WEST VIRGINIA UNIV.

2009-01-01T23:59:59.000Z

259

Issue Date  

E-Print Network (OSTI)

Report on Financial Statements and Federal Single Audit Please find attached our report on the City of Issaquahs financial statements and compliance with federal laws and regulations. We are issuing this report in order to provide information on the Citys financial condition.

Brian Sonntag; City Council; City Of Issaquah; Brian Sonntag Cgfm

2010-01-01T23:59:59.000Z

260

Entergy Grand Gulf site, MS issued on April 5, 2007. Dominion Energy North Anna site, VA issued on November 27, 2007.  

E-Print Network (OSTI)

decision expected 2009. Duke notified NRC of future planned ESP applications (as many as 2) Possibly Oconee County, SC, and Davie County, NC, no dates identified. Unspecified power company announced plans to submit an ESP application in fiscal year 2010. Combined Construction and Operating License (COL) Summary: Of nine COL applications submitted, six have been docketed for NRC review. 20 power companies, of which two are unidentified, intend to submit 23 license applications for 34 units. A Reference COL (R-COL) application has been submitted for four of the five reactor designs. Combined Construction and Operating License Applications (COLA) Submitted:

unknown authors

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Entergy Grand Gulf site, MS issued on April 5, 2007. Dominion Energy North Anna site, VA issued on November 27, 2007.  

E-Print Network (OSTI)

decision expected 2009. Duke notified NRC of future planned ESP applications (as many as 2) Possibly Oconee County, SC, and Davie County, NC, no dates identified. Unspecified power company announced plans to submit an ESP application in fiscal year 2010. Combined Construction and Operating License (COL) Summary: Of nine COL applications submitted, four have been docketed for NRC review. 19 power companies, of which one is unidentified, intend to submit 22 license applications for 33 units. A Reference COL (R-COL) application has been submitted for four of the five reactor designs. Combined Construction and Operating License Applications (COLA) Submitted:

unknown authors

2008-01-01T23:59:59.000Z

262

Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository  

SciTech Connect

If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required for a construction authorization. The LA must also support a licensing proceeding before an Atomic Safety and Licensing Board panel prior to NRC action on any decision to authorize construction. The DOE has established a strategic basis for planning that is intended to provide the framework for development of an integrated plan for activities leading to preparation and submittal of a LA.

Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

2002-02-26T23:59:59.000Z

263

City of Dubuque - Solar Thermal Licensing Requirement | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

City of Dubuque - Solar Thermal Licensing Requirement City of Dubuque - Solar Thermal Licensing Requirement City of Dubuque - Solar Thermal Licensing Requirement < Back Eligibility Construction Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Iowa Program Type Solar/Wind Contractor Licensing Provider City of Dubuque The City of Dubuque requires a Solar Thermal License in order for a person to install a solar thermal project on a home or business. The requirement does not apply to solar photovoltaics. The licensing requirement can be met one of two ways. An installer may be Solar Thermal Certified by the North American Board of Certified Energy Practitioners (NABCEP) or An installer may complete the Northeast Iowa Community College Solar Thermal Training Installers are also required to obtain a permit before altering or

264

Nuclear Regulatory Commission Regulatory and Licensing Matters | Department  

NLE Websites -- All DOE Office Websites (Extended Search)

Regulatory Commission Regulatory and Licensing Matters Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a variety of NRC matters including regulation and licensing of DOE independent spent fuel storage facilities (ISFSIs) and a mixed-oxide fuel fabrication facility, consultation with NRC on certain DOE waste determinations, and imports and exports of nuclear materials and radioactive sealed sources.

265

Patents Licensing and Patent Waivers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Patents Licensing and Patent Waivers Patents Licensing and Patent Waivers Patents Licensing and Patent Waivers Patent Licensing The DOE Invention Licensing Program provides information on licensing of DOE-owned inventions. Patent Waivers Patent Rights - Waiver Clause: This clause makes modifications to the Patent Rights clause of 48 C.F.R. 52.227-12 and should replace that clause in the contract when an advance waiver is granted. Petition form for advance waiver (PDF) to contractor of Government's title to inventions that may be made under a Government contract [42 U.S.C. 5908] [10 C.F.R. Part 784]. Petition form for waiver (PDF) to contractor of Government's title to an identified invention already made under a Government contract [42 U.S.C. 5908] [10 C.F.R. Part 784]. Patent Waiver Decisions:

266

Decommissioning of the Nuclear Licensed Facilities at the Fontenay aux Roses CEA Center  

SciTech Connect

This is a summary of the program for the decommissioning of all the CEA's facilities in Fontenay aux Roses. The particularity of this center is that it is located in a built-up area. Taking into account the particularities of the various buildings and the levels of radioactivity in them, it was possible to devise a coherent, optimized program for the CEA-FAR licensed nuclear facility decommissioning operations.

Jeanjacques, Michel; Piketty, Laurence; Mandard, Lionel; Pedron, Guy; Boissonneau, Jean Francois; Fouquereau, Alain; Pichereau, Eric; Lethuaire, Nathalie; Estivie, David; Binet, Cedric; Meden, Igor [Commissariat a l'Energie Atomique, Direction de l'Energie Nucleaire, Direction deleguee des Activites Nucleaires de Saclay, Departement des Reacteurs et des Services Nucleaires, Service d'Assainissement de Fontenay Aux Roses : 18, route du Panorama, BP6, 92265 Fontenay aux Roses Cedex (France)

2008-01-15T23:59:59.000Z

267

Vorbeck Materials Licenses Graphene-based Battery Technologies ...  

Vorbeck Materials Licenses Graphene-based Battery Technologies Vorbeck Materials Corp of Jessup, MD participated in the Americas Next Top Energy Innovator program ...

268

LED North America Receives Exclusive Patent License for ORNL...  

NLE Websites -- All DOE Office Websites (Extended Search)

Highlights Success Stories Contact Us Index Home | ORNL | Success Stories SHARE LED North America Receives Exclusive Patent License for ORNL Technology June 19, 2013 Views...

269

Property:FERC License Issuance Date | Open Energy Information  

Open Energy Info (EERE)

Issuance Date Jump to: navigation, search Property Name FERC License Issuance Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense...

270

Property:FERC License Application Date | Open Energy Information  

Open Energy Info (EERE)

Property Name FERC License Application Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicenseApplicationDate&oldid610687...

271

Get listed in the Directory of Licensed Professionals | ENERGY...  

NLE Websites -- All DOE Office Websites (Extended Search)

or Province(s) in which you are a licensed Professional Engineer or Registered Architect Whether you hold a Green Building Engineer certification from the Association of...

272

Glass Furnace Model (GFM) Six-Month Trial License  

Licensed Program is furnished is free of manufacturing defects and damage provided that the media has been properly installed by Licensee.

273

Non-exclusive patent license agreement between Alliance and ...  

DRAFT FOR DISCUSSION PURPOSES ONLY Page 1 of 19 NON-EXCLUSIVE PATENT LICENSE AGREEMENT Between Alliance for Sustainable Energy, LLC And

274

Sandia National Laboratories : Licensing/Technology Transfer News  

Search; About Sandia; Mission Areas; Newsroom; Careers; Doing Business; Education; Contact Us; News. IP Home; Search/Browse Technology Portfolios; Licensing Overview ...

275

NETL: News Release - DOE Licenses Mercury Control Patent to Help...  

NLE Websites -- All DOE Office Websites (Extended Search)

4, 2007 DOE Licenses Mercury Control Patent to Help Meet Clean Air Regulations Research Aims at Trace Element Reduction from Power Generation Facilities by 2010 Washington, DC - A...

276

MC2, Version 3.0, Software License Agreement  

Licensed Program is furnished is free of manufacturing defects and damage provided that the media has been properly installed by Licensee.

277

NETL: News Release - Licensing Agreement Moves Two NETL-Patented...  

NLE Websites -- All DOE Office Websites (Extended Search)

March 23, 2011 Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization Washington, D.C. - Two new patented sorbents used for carbon dioxide...

278

Argonne, Evigia finalize licensing agreement for next-gen RFID...  

NLE Websites -- All DOE Office Websites (Extended Search)

See related New RFID technology tracks and monitors nuclear materials Argonne, Evigia finalize licensing agreement for next-gen RFID sensor technology By Angela Hardin * July 16,...

279

U.S. Department of Energy Technologies Available for Licensing ...  

U.S. Department of Energy Technologies Available for Licensing Our Mission. The mission of the Energy Department is to ensure Americas security and prosperity by ...

280

NRC Licensing Strategy Development for the NGNP  

DOE Green Energy (OSTI)

The Next Generation Nuclear Plant (NGNP) project will provide the basis for commercialization of a new generation of advanced nuclear plants that utilize hightemperature gas-cooled reactor (HTGR) technology. The inherently safe HTGR design characteristics can be utilized to supply high-temperature process heat, co-generated electricity, and/or hydrogen for a number of industrial applications (e.g., petrochemical processes). Completion of the NGNP will result in a facility that demonstrates the safety and economics of the design, the commercial industrial potential of the technology, and the viability of the licensing strategy.

Mark R. Holbrook; Trevor Cook

2008-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Issued by Sandia National Laboratories,  

NLE Websites -- All DOE Office Websites (Extended Search)

Issued by Sandia National Laboratories, operated for the United States Issued by Sandia National Laboratories, operated for the United States Department of Energy by Sandia Corporation. NOTICE: This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government, nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, make any warranty, express or implied, or assume any legal liability

282

Issues in Emerging Home Delivery Operations  

E-Print Network (OSTI)

convenience stores and gas stations available for 24 hours,hour convenient stores or gas stations as local pick-up and

Park, Minyoung; Regan, Amelia

2004-01-01T23:59:59.000Z

283

Open Issues  

NLE Websites -- All DOE Office Websites (Extended Search)

"Unable to open kgni version file /sys/class/gemini/kgni0/version" error "Unable to open kgni version file /sys/class/gemini/kgni0/version" error April 13, 2011 by Helen He | 0 Comments Symptom: Dynamic executables built with compiler wrappers running directly on the external login nodes are getting the following error message: 0 comments | Read the full post Resolved -- Default version not shown in "module avail module_name" command April 13, 2011 by Helen He | 0 Comments Symptom: The default software version is not shown when "module avail module_name" is issued. For example: 0 comments | Read the full post Job dependencies do not work as expected. Require additional string in job name April 8, 2011 by Katie Antypas | 0 Comments Symptom: submitting jobs which depend on other jobs does not work. 0 comments | Read the full post

284

NEAMS Software Licensing, Release, and Distribution: Implications for FY2013 Work Package Planning  

Science Conference Proceedings (OSTI)

The vision of the NEAMS program is to bring truly predictive modeling and simulation (M&S) capabilities to the nuclear engineering community in order to enable a new approach to the analysis of nuclear systems. NEAMS anticipates issuing in FY 2018 a full release of its computational 'Fermi Toolkit' aimed at advanced reactor and fuel cycles. The NEAMS toolkit involves extensive software development activities, some of which have already been underway for several years, however, the Advanced Modeling and Simulation Office (AMSO), which sponsors the NEAMS program, has not yet issued any official guidance regarding software licensing, release, and distribution policies. This motivated an FY12 task in the Capability Transfer work package to develop and recommend an appropriate set of policies. The current preliminary report is intended to provide awareness of issues with implications for work package planning for FY13. We anticipate a small amount of effort associated with putting into place formal licenses and contributor agreements for NEAMS software which doesn't already have them. We do not anticipate any additional effort or costs associated with software release procedures or schedules beyond those dictated by the quality expectations for the software. The largest potential costs we anticipate would be associated with the setup and maintenance of shared code repositories for development and early access to NEAMS software products. We also anticipate an opportunity, with modest associated costs, to work with the Radiation Safety Information Computational Center (RSICC) to clarify export control assessment policies for software under development.

Bernholdt, David E [ORNL

2012-06-01T23:59:59.000Z

285

Human Factors Aspects of Operating Small Reactors  

DOE Green Energy (OSTI)

The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. They are considering small modular reactors (SMRs) as one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants, and so may require a concept of operations (ConOps) that also is different. The U.S. Nuclear Regulatory Commission (NRC) has begun examining the human factors engineering- (HFE) and ConOps- aspects of SMRs; if needed, they will formulate guidance to support SMR licensing reviews. We developed a ConOps model, consisting of the following dimensions: Plant mission; roles and responsibilities of all agents; staffing, qualifications, and training; management of normal operations; management of off-normal conditions and emergencies; and, management of maintenance and modifications. We are reviewing information on SMR design to obtain data about each of these dimensions, and have identified several preliminary issues. In addition, we are obtaining operations-related information from other types of multi-module systems, such as refineries, to identify lessons learned from their experience. Here, we describe the project's methodology and our preliminary findings.

OHara, J.M.; Higgins, J.; Deem, R. (BNL); Xing, J.; DAgostino, A. (NRC)

2010-11-07T23:59:59.000Z

286

DOE Announces Yucca Mountain License Application Schedule | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Yucca Mountain License Application Schedule Yucca Mountain License Application Schedule DOE Announces Yucca Mountain License Application Schedule July 19, 2006 - 3:13pm Addthis New Director Ward Sproat Testifies on Revised Timeline WASHINGTON, DC - The Department of Energy (DOE) today announced that it will submit a license application to the Nuclear Regulatory Commission (NRC) for a nuclear waste repository at Yucca Mountain, Nevada, no later than June 30, 2008. The Department also announced that if requested legislative changes are enacted, the repository will be able to accept spent nuclear fuel and high-level waste starting in early 2017. Announcing a schedule for submitting a license application is another step in the Department's mission to provide stability, clarity and predictability in moving the Yucca Mountain Project forward as quickly as

287

Los Alamos National Laboratory announces Express Licensing program  

NLE Websites -- All DOE Office Websites (Extended Search)

LANL announces Express Licensing program LANL announces Express Licensing program Los Alamos National Laboratory announces Express Licensing program With the launch of a new "Express Licensing" program, access to innovative technology invented at Los Alamos National Laboratory has gotten easier. August 1, 2013 The following sequence shows the formation of nanoFOAM technology developed at Los Alamos National Laboratory. NanoFOAMs are self-supporting nanoporous metal foams that have potential applications in oil-refining processes, filtration of liquid or airborne germs, rocket fuels or catalytic production of a range of products from ammonia to plastics. NanoFOAM is just one of many licensable technologies available at Los Alamos National Laboratory. The following sequence shows the formation of nanoFOAM technology developed

288

Solar Hot Water Contractor Licensing | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solar Hot Water Contractor Licensing Solar Hot Water Contractor Licensing Solar Hot Water Contractor Licensing < Back Eligibility Installer/Contractor Savings Category Heating & Cooling Solar Water Heating Program Info State Maine Program Type Solar/Wind Contractor Licensing In order to be eligible for Maine's solar thermal rebate program, systems must be installed by licensed plumbers who have received additional certification for solar thermal systems from the North American Board of Certified Energy Practitioners (NABCEP). The state solar thermal rebate program maintains a list of Efficiency Maine registered vendors/installers. In addition, Efficiency Maine has information for vendors interested in becoming registered and listed on the [http://www.efficiencymaine.com/at-home/registered-vendor-locator web

289

Why did DOE issue a DEC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

did DOE issue a DEC? did DOE issue a DEC? DOE issued the DEC to more effectively promote U.S. manufacturing of new technologies developed under certain DOE funding agreements (e.g. cooperative agreements), a key objective of the Bayh-Dole Act. What does the DEC do? It allows DOE to require all applicants, regardless of type, to submit U.S. manufacturing plans, use U.S. manufacturing plans to evaluate and select applications, and ensure compliance of U.S. manufacturing plans. What is a U.S. manufacturing plan? A U.S. manufacturing plan is an applicant's measurable commitment to support U.S. manufacturing of the technologies related to their DOE funding agreement. The range of commitment may include, for example, manufacturing certain products in the U.S., investing in U.S. facilities or a licensing strategy

290

Statement by Deputy Secretary of Energy Clay Sell on NRG's License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

by Deputy Secretary of Energy Clay Sell on NRG's by Deputy Secretary of Energy Clay Sell on NRG's License Application Statement by Deputy Secretary of Energy Clay Sell on NRG's License Application September 25, 2007 - 2:49pm Addthis "Today marks the most significant and tangible step to date, towards the construction of the first new nuclear power plant in the United States in over 30 years. DOE is confident that with NRG's reactor design selection and cooperation with their partners, General Electric and Toshiba, this project will likely result in the first of many new reactors being constructed and operated in the U.S. This reactor would join an American nuclear industry that is safe, secure and has a strong record to prove it. We look forward to the continued cooperation with industrial partners and

291

Burnup Credit Approach Used in the Yucca Mountain License Application  

SciTech Connect

The United States Department of Energy has submitted a license application (LA) for construction authorization of a deep geologic repository at Yucca Mountain, Nevada. The license application is currently under review by the United States Nuclear Regulatory Commission (NRC). This paper will describe the methodology and approach used in the LA to address the issue of criticality and the role of burnup credit during the postclosure period. The most significant and effective measures for prevention of criticality in the repository include multiple redundant barriers that act to isolate fissionable material from water (which can act as a moderator, corrosive agent, and transporter of fissile material); inherent geometry of waste package internals and waste forms; presence of fixed neutron absorbers in waste package internals; and fuel burnup for commercial spent nuclear fuel. A probabilistic approach has been used to screen criticality from the total system performance assessment. Within the probabilistic approach, criticality is considered an event, and the total probability of a criticality event occurring within 10,000 years of disposal is calculated and compared against the regulatory criterion. The total probability of criticality includes contributions associated with both internal (within waste packages) and external (external to waste packages) criticality for each of the initiating events that could lead to waste package breach. The occurrence of and conditions necessary for criticality in the repository have been thoroughly evaluated using a comprehensive range of parameter distributions. A simplified design-basis modeling approach has been used to evaluate the probability of criticality by using numerous significant and conservative assumptions. Burnup credit is used only for evaluations of in-package configurations and uses a combination of conservative and bounding modeling approximations to ensure conservatism. This paper will review the NRC regulatory criteria relevant to postclosure criticality, explain the role of criticality within the overall repository performance assessment, describe the strategy for preventing criticality via design features and waste form properties, and discuss the numerous considerations relevant to criticality and burnup credit for spent nuclear fuel disposed of in a geologic repository, with emphasis on the burnup credit approach and analyses.

Scaglione, John M [ORNL; Wagner, John C [ORNL

2010-01-01T23:59:59.000Z

292

TEAM 1 Drivers License.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

I I Core Status: new users must complete 2 training sessions and pass a sample exchange exam to work independently during Core sessions (regular work hours). Flex Status: core users must complete 5 Core sessions and pass a driving test to work during Flex sessions (evening and weekend hours). All TEAM I scheduling must be coordinated through Peter Ercius at PErcius@lbl.gov. You may only be assigned two sessions per month. CORE LICENSE TEST Safety  Understand emergency shutdown procedure  Understand potential X-ray hazards of the modified instrument and shielding  Read and understand the Low Dose Machine Authorization document  Recognize high voltage hazards with the TEAM stage  Demonstrate handling of column valves  Point out where emergency contact numbers are posted

293

Patent Protection and Licensing Procedure | BNL Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

BNL Inventors BNL Inventors Patent Protection and Licensing Procedure TCP Staff Assignment - Invention Disclosures received by Intellectual Property Legal Group (IPLG) will be given a BNL number, and assigned to a specific TCP staff member for commercial assessment. Henceforth, the assigned staff member will be responsible for all commercialization actions relating to the docket. Assessment - The TCP staff member assigned to the docket will meet with the inventor(s). Together they will discuss the invention and make a preliminary evaluation of potential applications and possible markets. Based on commercial assessment and a preliminary novelty determination, the TCP staff will make a recommendation to the IPLG whether to patent the invention. The TCP's decision and relevant documents will be circulated

294

Operations Directorate (OPS Directorate)  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Directorate (OPS Directorate) Operations Directorate (OPS Directorate) Purpose A group chartered by the Associate Laboratory Director for the Advanced Photon Source that includes the responsible Division Directors and other appropriate APS operations personnel. The Operations Directorate collectively coordinates operating decisions that affect the facility as a whole and establishes both long- and short-term schedules, including scheduled maintenance and facility improvement periods. The Operations Directorate is the APS forum in which decisions regarding operations are discussed: These include, but are not limited to: Safety issues related to operations Operational Schedule Global operating parameters within the defined and approved operational and safety envelopes, such as energy, maximum circulating beam

295

Open Issues  

NLE Websites -- All DOE Office Websites (Extended Search)

RESOLVED: Projectb filesystem outage July 9, 2012 RESOLVED: Projectb filesystem outage July 9, 2012 July 9, 2012 | 0 Comments The projectb filesystem had a hardware failure that potentially generated I/O errors. The filesystem logs indicate that the earliest abnormal event on the filesystem occurred at 9:19AM and the filesystem was taken down for maintenance at 10:42AM. The filesystem returned to service at 11:20AM. Jobs running on the cluster would not have been able to read from or write to the projectb filesystem between 10:42AM and 11:20AM. Between 9:19AM and 10:42AM one out of the 20 GPFS controllers on projectb was down, and didn't failover (as it should have). This means: 1/20 file I/O operations could have failed between 9:19AM and 10:42AM If your job was performing a large number of short reads and writes, then

296

Web-based training related to NRC staff review of dose modeling aspects of license termination and decommissioning plans.  

SciTech Connect

NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course is being developed in 2006 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The training course consists of the core and advanced modules tailored to specific NRC job functions. Topics for individual modules include identifying the characteristics of simple and complex sites, identifying when outside expertise or consultation is needed, demonstrating how to conduct acceptance and technical reviews of dose modeling, and providing details regarding the level of justification needed for realistic scenarios for both dose modeling and derivation of DCGLs. Various methods of applying probabilistic uncertainty analysis to demonstrate compliance with dose-based requirements are presented. These approaches include: (1) modeling the pathways of radiological exposure and estimating doses to receptors from a combination of contaminated media and radionuclides, and (2) using probabilistic analysis to determine an appropriate set of input parameters to develop derived concentration guideline limits or DCGLs (DCGLs are media- and nuclide-specific concentration limits that will meet dose-based, license termination rule criteria found in 10 CFR Part 20, Subpart E). Calculation of operational (field) DCGL's from media- and nuclide-specific DCGLs and use of operational DCGLs in conducting final status surveys are addressed in the WBT. Realistic case examples are presented and analyzed including the abstraction of a realistic site into a conceptual model and computer model. A case history is also used to demonstrate development of NRC review documents such as requests for additional information (RAIs). To enhance the web-based training experience, audio, animations, linked documents, quizzes, and scripts are being integrated with a commercial web-based training package that supports simple navigation. The course is also being integrated into both existing and state-of-the-art learning management systems. A testing group is being utilized to identify and help resolve training issues prior to deployment of the course. When completed, the course can be accessed for credited training with required modules dependent on the job category of the training participant. The modules will also be accessible to NRC staff for review or refresher following initial course completion. WBT promotes consistency in reviews and has the advantage of being able to be used as a resource to staff at any time. The WBT provides reviewers with knowledge needed to perform risk-informed analyses (e.g., information related to development of realistic scenarios and use of probabilistic analysis). WBT on review of LTP or DP dose modeling promotes staff development, efficiency, and effectiveness in performing risk-informed, performance-based reviews of decommissioning activities at NRC-licensed facilities.

LePoire, D.; Arnish, J.; Cheng, J. J.; Kamboj, S.; Richmond, P.; Chen, S. Y.; Barr, C.; McKenney, C.; Environmental Science Division; NRC

2007-01-01T23:59:59.000Z

297

Web-based training related to NRC staff review of dose modeling aspects of license termination and decommissioning plans  

SciTech Connect

NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course is being developed in 2006 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The training course consists of the core and advanced modules tailored to specific NRC job functions. Topics for individual modules include identifying the characteristics of simple and complex sites, identifying when outside expertise or consultation is needed, demonstrating how to conduct acceptance and technical reviews of dose modeling, and providing details regarding the level of justification needed for realistic scenarios for both dose modeling and derivation of DCGLs. Various methods of applying probabilistic uncertainty analysis to demonstrate compliance with dose-based requirements are presented. These approaches include 1) modeling the pathways of radiological exposure and estimating doses to receptors from a combination of contaminated media and radionuclides, and 2) using probabilistic analysis to determine an appropriate set of input parameters to develop derived concentration guideline limits or DCGLs (DCGLs are media- and nuclide-specific concentration limits that will meet dose-based, license termination rule criteria found in 10 CFR Part 20, Subpart E). Calculation of operational (field) DCGL's from media- and nuclide-specific DCGLs and use of operational DCGLs in conducting final status surveys are addressed in the WBT. Realistic case examples are presented and analyzed including the abstraction of a realistic site into a conceptual model and computer model. A case history is also used to demonstrate development of NRC review documents such as requests for additional information (RAIs). To enhance the web-based training experience, audio, animations, linked documents, quizzes, and scripts are being integrated with a commercial web-based training package that supports simple navigation. The course is also being integrated into both existing and state-of-the-art learning management systems. A testing group is being utilized to identify and help resolve training issues prior to deployment of the course. When completed, the course can be accessed for credited training with required modules dependent on the job category of the training participant. The modules will also be accessible to NRC staff for review or refresher following initial course completion. WBT promotes consistency in reviews and has the advantage of being able to be used as a resource to staff at any time. The WBT will provide reviewers with knowledge needed to perform risk-informed analyses (e.g., information related to development of realistic scenarios and use of probabilistic analysis). WBT on review of LTP or DP dose modeling will promote staff development, efficiency, and effectiveness in performing risk-informed, performance-based reviews of decommissioning activities at NRC-licensed facilities. (authors)

LePoire, D.; Arnish, J.; Cheng, J.J.; Kamboj, S.; Richmond, P.; Chen, S.Y. [Argonne National Laboratory, Argonne, IL (United States); Barr, C.; McKenney, C. [U.S. Nuclear Regulatory Commission, Rockville, MD (United States)

2007-07-01T23:59:59.000Z

298

Sandia National Laboratories : Licensing/Technology Transfer ...  

DOE SBIR TTI; Government Use Notices; ... 10674.1: 7,741,613 06/22/2010 Issued: Neutron ... Published 09/29/2011 Last Updated 10/18/2013

299

Sandia National Laboratories : Licensing/Technology Transfer ...  

7662.1: 7,785,391 08/31/2010 Issued: Technology ID ... Published 07/29/2013 Last Updated 10/14/2013 ... News release RSS feed ...

300

DOE Marks Milestone in Submitting Yucca Mountain License Application |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marks Milestone in Submitting Yucca Mountain License Marks Milestone in Submitting Yucca Mountain License Application DOE Marks Milestone in Submitting Yucca Mountain License Application June 3, 2008 - 12:51pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced submittal of a license application (LA) to the U.S. Nuclear Regulatory Commission (NRC) seeking authorization to construct America's first repository for spent nuclear fuel and high-level radioactive waste at Yucca Mountain, Nevada. The 8,600 page application describes DOE's plan to safely isolate spent nuclear fuel and high-level radioactive waste in tunnels deep underground at Yucca Mountain, a remote ridge on federally controlled land in the Mojave Desert 90 miles northwest of Las Vegas. Currently, the waste is stored at 121 temporary locations in 39 states

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

DOE Signs Advanced Enrichment Technology License and Facility Lease |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advanced Enrichment Technology License and Facility Lease Advanced Enrichment Technology License and Facility Lease DOE Signs Advanced Enrichment Technology License and Facility Lease December 8, 2006 - 9:34am Addthis Announces Agreements with USEC Enabling Deployment of Advanced Domestic Technology for Uranium Enrichment WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman today announced the signing of a lease agreement with the United States Enrichment Corporation, Inc. (USEC) for their use of the Department's gas centrifuge enrichment plant (GCEP) facilities in Piketon, OH for their American Centrifuge Plant. The Department of Energy (DOE) also granted a non-exclusive patent license to USEC for use of DOE's centrifuge technology for uranium enrichment at the plant, which will initiate the first successful deployment of advanced domestic enrichment technology in the

302

ENERGY COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE  

Office of Legacy Management (LM)

COMMISSION COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE Pursuant to the rcgu!ations in Title 10, Code of Federal Regulations, Chapter 1, Part 40, application is hereby made for a license to receive, possess, use, transfer, deliver or import into the United Stat-, source material for the activity or activities described. 1. (check ooa) 2. NAME OF APPLICANT W. R. GRACE 6 Co. 0 (a) New Iicense 0 (b) Amendment to License No.- Davison Chemical Division STA-422 3. Q (c) Renewal of Licensr No. 0 (d) Previous License No. Pompton Plains, N. J. 4. ST,.TE THE AOORESS(ES) AT WHICH SOURCE MATERIAL WILL BE POSSESSED OR USED 868 Black Oak Ridge Road, Wayne, fi. J. a*ocY s up/'l File IF 5. BUSINESS OR OCCUPATION I 6. (a) IF APPLICANT IS AN INDIVIDUAL. STATE CITIZENSHIP

303

Property:Permit/License Buildout (MW) | Open Energy Information  

Open Energy Info (EERE)

Permit/License Buildout (MW) Permit/License Buildout (MW) Jump to: navigation, search Property Name Permit/License Buildout (MW) Property Type String Pages using the property "Permit/License Buildout (MW)" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/40MW Lewis project + 40 + MHK Projects/Algiers Light Project + 20 + MHK Projects/Anconia Point Project + 15 + MHK Projects/Ashley Point Project + 148 + MHK Projects/Avalon Tidal + 30 + MHK Projects/Avondale Bend Project + 18 + MHK Projects/BW2 Tidal + 3 + MHK Projects/Bar Field Bend + 94 + MHK Projects/Barfield Point + 114 + MHK Projects/Bayou Latenache + 50 + MHK Projects/Bondurant Chute + 152 + MHK Projects/Breeze Point + 198 + MHK Projects/Brilliant Point Project + 56 + MHK Projects/Brough Head Wave Farm + 200 +

304

ECOdriving - Widespread Implementation for Learner Drivers and Licensed  

Open Energy Info (EERE)

ECOdriving - Widespread Implementation for Learner Drivers and Licensed ECOdriving - Widespread Implementation for Learner Drivers and Licensed Drivers (ECOWILL) Jump to: navigation, search Tool Summary LAUNCH TOOL Name: ECOdriving - Widespread Implementation for Learner Drivers and Licensed Drivers (ECOWILL) Agency/Company /Organization: Austrian Energy Agency Focus Area: Fuels & Efficiency Topics: Best Practices Website: www.ecodrive.org/ The ECOWILL project aims to reduce carbon emissions by up to 8 Mt until 2015 by boosting the application of eco-driving across Europe. The project will roll out training programs for licensed drivers in 13 European countries. ECOWILL also promotes the education of eco-driving for learner drivers. This website provides information about eco-driving, including country-specific activities.

305

NATIONAL ENERGY TECHNOLOGY LABORATORY (NETL) LICENSE ON FEDERALLY ...  

The facts set forth in this request for license are within the knowledge of the requestor and are submitted with the intention that the Director of the NETL rely on ...

306

Licensing arrangements and the development of the solar energy industry  

SciTech Connect

The process by which technology and information related to technology are transferred within industry is explored. Property rights in technology are part of the broader field of intellectual property. The general contours of legal protection for knowledge are explored. The four basic forms of intellectual property - patents, trade secrets (or know-how), trademarks, and copyrights - are covered in varying degrees of depth, depending on their relative applicability to the development of the solar industry. Once this background has been established, the legal aspects of licensing are examined. A license is a legal arrangement whereby a party (licensor) who controls the right to use an idea, invention, etc. shares the right to use the particular intellectual property with someone else (licensee). The advantages and disadvantages of licensing are described from the point of view of potential licensees and licensors. Barriers to licensing are discussed.

Green, M.

1979-06-01T23:59:59.000Z

307

Argonne Software Licensing: SAS4A/SASSYS-1  

BatPro software licensing ... SAS4A/SASSYS-1. The SAS4A/SASSYS-1 safety analysis code system is a simulation tool to perform deterministic transient safety analysis ...

308

Y-12 cleaning technology licensed by local engineering firm ...  

NLE Websites -- All DOE Office Websites (Extended Search)

cleaning technology ... Y-12 cleaning technology licensed by local engineering firm Posted: October 31, 2012 - 10:00am MK Technologies CEO and founder Mike Carroll and director of...

309

DOCKET NO. 40-9027 LICENSE NO. LICENSEE: SUBJECT:  

E-Print Network (OSTI)

License SMC-1562, covering storage of radioactive materials at both its Revere and Reading sites in Pennsylvania. Former ore processing at the Revere facility generated waste slag contaminated with uranium and thorium. In 1988, Cabot began onsite decommissioning

unknown authors

2001-01-01T23:59:59.000Z

310

ORNL, Da Vinci Sign Licensing Agreement | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Da Vinci Sign Licensing Agreement April 12, 2012 Seated are (l to r) ORNL Partnerships Director Tom Ballard and Da Vinci CEO Kent Froelund. Standing are (l to r) Johney Green, ORNL...

311

Software Development and Licensing at the Berkeley Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

explain software licensing and distribution options available for LBNL software and how Tech Transfer can help get the job done. If you are a software developer, or you supervise...

312

For The Calvert Cliffs Combined License Application  

E-Print Network (OSTI)

The purpose of this letter is to respond to the requests for additional information (RAIs) identified in the NRC letter to UniStar dated February 3, 2009 (Reference 1). The RAIs address figures needed to publish the environmental impact statement (EIS) and information necessary for completion of regulatory reviews. UniStar Regulatory Affairs staff, UniStar vendors for the Calvert Cliffs Nuclear Power Plant Unit 3 (CCNPP3) project, NRC headquarters staff, and NRC contractors supporting review of the CCNPP3 Combined License Application (COLA) environmental report discussed the scope of the RAIs (Reference 1) during four telephone conferences on February 13, 18, 19, and 24. The discussions focused on how UniStar can provide the NRC with graphics needed to develop the CCNPP3 Draft EIS and necessary additional details of environmental reviews performed by UniStar. The telephone conferences resulted in a common understanding of the NRC requests and how UniStar can provide the needed information (Reference 2).UN#09-1140 Page 2 of 2 The NRC staff agreed that certain information regarding alternate sites is available in the

unknown authors

2009-01-01T23:59:59.000Z

313

Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3070)  

Science Conference Proceedings (OSTI)

This two-volume Final Environmental Impact Statement (FEIS) was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA). Volume 1 contains the assessment of the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana, by Louisiana Energy Services, LP. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are construction, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning (D&D)- of the site. Issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment. The FEIS supports issuance of a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility.

Zeitoun, A. [Science Applications International Corp., Germantown, MD (United States)

1994-08-01T23:59:59.000Z

314

Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Pilgrim Nuclear Power Station (PNPS) License Renewal Application  

E-Print Network (OSTI)

information that supplemented the LRA as a result of operating experience (OE) and industry activities potentially relevant to aging management in several specific areas. This letter provides further clarification of that supplemental information to the LRA specific to the following areas which Entergy agreed to evaluate based upon communications with the NRC technical staff. 1. Aging management of neutron-absorbing materialsEntergy Nuclear Operations, Inc. Letter Number: 2.11.017 Pilgrim Nuclear Power Station Page 2 2. Inspection of buried pipe and tanks 3. Aging management of low voltage cables 4. Inspection of containment coatings 5. Metal fatigue NUREG/CR-6260 A new regulatory commitment is provided in the PNPS License Renewal Commitment List as

Stephen J. Bethay

2011-01-01T23:59:59.000Z

315

Federal Technical Capability Program - Issue Papers  

NLE Websites -- All DOE Office Websites (Extended Search)

FTCP Plans, Reports & Issue Papers FTCP Plans, Reports & Issue Papers FTCP Plans and Reports FTCP Operational Plans FTCP Issue Papers STSM Status Report FTCP Issue Papers PD.08.001 FTCP Issues Process, 8-25-2008 Document Number Subject Disposition FTCP-12-003 Supplemental Competencies Approved by FTCP Chair, December 19, 2012 PDF Template FTCP-12-001 Use of "Expert Level" in Qualification Path Forward Approved by vote at May 15, 2012 meeting; to delete all reference to expert-level knowledge requirements in FAQS PDF FTCP-10-003 Expert Competencies Pertaining to DOE Orders & Technical Standards Issue transitioned to FY 2011 FTCP Operational Plan Goal #2 FTCP-10-002 Expert-Level Knowledge Issue assigned to team lead by Debbie Monette to evaluate the expert competencies for possible re-classification. See FTCP-10-003.

316

License Stewardship Approach to Commercial Nuclear Power Plant Decommissioning  

SciTech Connect

The paper explores both the conceptual approach to decommissioning commercial nuclear facilities using a license stewardship approach as well as the first commercial application of this approach. The license stewardship approach involves a decommissioning company taking control of a site and the 10 CFR 50 License in order to complete the work utilizing the established trust fund. In conclusion: The license stewardship approach is a novel way to approach the decommissioning of a retired nuclear power plant that offers several key advantages to all parties. For the owner and regulators, it provides assurance that the station will be decommissioned in a safe, timely manner. Ratepayers are assured that the work will be completed for the price they already have paid, with the decommissioning contractor assuming the financial risk of decommissioning. The contractor gains control of the assets and liabilities, the license, and the decommissioning fund. This enables the decommissioning contractor to control their work and eliminates redundant layers of management, while bringing more focus on achieving the desired end state - a restored site. (authors)

Daly, P.T.; Hlopak, W.J. [Commercial Services Group, EnergySolutions 1009 Commerce Park, Oak Ridge, TN (United States)

2008-07-01T23:59:59.000Z

317

PRECLOSURE CONSEQUENCE ANALYSES FOR LICENSE APPLICATION  

Science Conference Proceedings (OSTI)

Radiological consequence analyses are performed for potential releases from normal operations in surface and subsurface facilities and from Category 1 and Category 2 event sequences during the preclosure period. Surface releases from normal repository operations are primarily from radionuclides released from opening a transportation cask during dry transfer operations of spent nuclear fuel (SNF) in Dry Transfer Facility 1 (DTF 1), Dry Transfer Facility 2 (DTF 2), the Canister Handling facility (CHF), or the Fuel Handling Facility (FHF). Subsurface releases from normal repository operations are from resuspension of waste package surface contamination and neutron activation of ventilated air and silica dust from host rock in the emplacement drifts. The purpose of this calculation is to demonstrate that the preclosure performance objectives, specified in 10 CFR 63.111(a) and 10 CFR 63.111(b), have been met for the proposed design and operations in the geologic repository operations area. Preclosure performance objectives are discussed in Section 6.2.3 and are summarized in Tables 1 and 2.

S. Tsai

2005-01-12T23:59:59.000Z

318

License amendment for neutron capture therapy at the MIT research reactor  

SciTech Connect

This paper reports the issuance by the U.S. Nuclear Regulatory Commission (NRC) of a license amendment to the Massachusetts Institute of Technology (MIT) for the use of the MIT Research Reactor's (MITR-II) medical therapy facility beam for the treatment of humans using neutron capture therapy (NCT). This amendment is one of 11 required approvals. The others are those of internal MIT committees, review panels of the Tufts-New England Medical Center (NEMC), which is directing the program jointly with MIT, that of the U.S. Food and Drug Administration, and an NRC amendment to the NEMC hospital license. This amendment is the first of its type to be issued by NRC, and as such it establishes a precedent for the conduct of human therapy using neutron beams. Neutron capture therapy is a bimodal method for treating cancer that entails the administration of a tumor-seeking boronated drug followed by the irradiation of the target organ with neutrons. The latter cause boron nuclei to fission and thereby release densely ionizing helium and lithium nuclei, which destroy cancerous cells while leaving adjacent healthy cells undamaged. Neutron capture therapy is applicable to glioblastoma multiforme (brain tumors) and metastasized melanoma (skin cancer). Both Brookhaven National Laboratory and MIT conducted trials of NCT more than 30 yr ago. These were unsuccessful because the available boron drugs did not concentrate sufficiently in tumor and because the thermal neutron beams that were used did not enable neutrons to travel deep enough into the brain.

Bernard, J.A. (Massachusetts Institute of Technology, Cambride, MA (United States))

1993-01-01T23:59:59.000Z

319

Lessons learnt from ITER safety & licensing for DEMO and future nuclear fusion facilities  

E-Print Network (OSTI)

One of the strong motivations for pursuing the development of fusion energy is its potentially low environmental impact and very good safety performance. But this safety and environmental potential can only be fully realized by careful design choices. For DEMO and other fusion facilities that will require nuclear licensing, S&E objectives and criteria should be set at an early stage and taken into account when choosing basic design options and throughout the design process. Studies in recent decades of the safety of fusion power plant concepts give a useful basis on which to build the S&E approach and to assess the impact of design choices. The experience of licensing ITER is of particular value, even though there are some important differences between ITER and DEMO. The ITER project has developed a safety case, produced a preliminary safety report and had it examined by the French nuclear safety authorities, leading to the licence to construct the facility. The key technical issues that arose during ...

Taylor, Neill

2013-01-01T23:59:59.000Z

320

Edison Known issues  

NLE Websites -- All DOE Office Websites (Extended Search)

3 or 510-486-8611 Home For Users Computational Systems Retired Systems Edison Phase I - Retired 6242013 Known issues Known issues IPM Not Reporting the FLOPS...

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

EM Issues Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SNF Transfer Shipments between SRS and INL - SNF Transfer Shipments between SRS and INL - Scott Declue, Federal Project Director, Savannah River Site * Completion of SNF Transfer results in: * Elimination of the entire SNF inventory at SRS * Reduction in the number of shipments of SNF from DOE Sites to the repository * Eliminates need for SRS to build/operate a SNF packaging and dry storage facility. * Integrated Project Team has been formed to work the issues * OCRWM has representation on IPT to ensure communications and transfer lessons learned to future RW activities * Plan to use GE-2000 and/or NAC-LWT casks (cask availability is not a constraint on the project at this time) * Shipments planned to start October 2009 * Stakeholder comments * Routing concerns include: * Use of southern route does not meet criteria for time in transit

322

Issues evaluation process at Rocky Flats Plant  

SciTech Connect

This report describes the issues evaluation process for Rocky Flats Plant as established in July 1990. The issues evaluation process was initiated February 27, 1990 with a Charter and Process Overview for short-term implementation. The purpose of the process was to determine the projects required for completion before the Phased Resumption of Plutonium Operations. To determine which projects were required, the issues evaluation process and emphasized risk mitigation, based on a ranking system. The purpose of this report is to document the early design of the issues evaluation process to record the methodologies used that continue as the basis for the ongoing Issues Management Program at Rocky Flats Plant.

Smith, L.C.

1992-04-16T23:59:59.000Z

323

Department of Energy Files Motion to Withdraw Yucca Mountain License  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Files Motion to Withdraw Yucca Mountain Files Motion to Withdraw Yucca Mountain License Application Department of Energy Files Motion to Withdraw Yucca Mountain License Application March 3, 2010 - 12:00am Addthis WASHINGTON, D.C. - The U.S. Department of Energy today filed a motion with the Nuclear Regulatory Commission to withdraw the license application for a high-level nuclear waste repository at Yucca Mountain with prejudice. "President Obama is fully committed to ensuring that the Nation meets our long-term storage obligations for nuclear waste," said Department of Energy General Counsel Scott Blake Harris. "In light of the decision not to proceed with the Yucca Mountain nuclear waste repository, the President directed Secretary Chu to establish the Blue Ribbon Commission on America's

324

Air Permits, Licenses, Certifications (Maine) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Air Permits, Licenses, Certifications (Maine) Air Permits, Licenses, Certifications (Maine) Air Permits, Licenses, Certifications (Maine) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Program Info State Maine Program Type Siting and Permitting Provider Department of Environmental Protection This program regulates and limits air emissions from a variety of sources within Maine through a statewide permitting program. Separate regulations exist for limiting emissions of nitrogen oxides (NOx), sulfur dioxide

325

Argonne licenses diamond semiconductor discoveries to AKHAN Technologies |  

NLE Websites -- All DOE Office Websites (Extended Search)

licenses diamond semiconductor discoveries to AKHAN Technologies licenses diamond semiconductor discoveries to AKHAN Technologies By Joseph Bernstein * By Jared Sagoff * March 4, 2013 Tweet EmailPrint LEMONT, Ill. - The U.S. Department of Energy's Argonne National Laboratory announced today that the laboratory has granted AKHAN Technologies exclusive diamond semiconductor application licensing rights to breakthrough low-temperature diamond deposition technology developed by Argonne's Center for Nanoscale Materials (CNM). The Argonne-developed technology allows for the deposition of nanocrystalline diamond on a variety of wafer substrate materials at temperatures as low as 400 degrees Celsius. The combination of the Argonne's low-temperature diamond technology with AKHAN's Miraj Diamond(tm) process represents the state of the art in diamond semiconductor

326

Electrical Energy Producer's License Tax (Montana) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Energy Producer's License Tax (Montana) Energy Producer&#039;s License Tax (Montana) Electrical Energy Producer's License Tax (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Institutional Multi-Family Residential Systems Integrator Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Montana Program Type Fees Provider Montana Department of Revenue Each person or other organization engaged in the generation, manufacture, or production of electricity and electrical energy in the state of Montana,

327

Property:FERC License Docket Number | Open Energy Information  

Open Energy Info (EERE)

License Docket Number License Docket Number Jump to: navigation, search This is a property of type string. Pages using the property "FERC License Docket Number" Showing 25 pages using this property. (previous 25) (next 25) M MHK Projects/Admirality Inlet Tidal Energy Project + P-12690 + MHK Projects/Algiers Light Project + P-12848 + MHK Projects/Anconia Point Project + P-12928 + MHK Projects/Astoria Tidal Energy + P-12665 + MHK Projects/Avalon Tidal + P-14228 + MHK Projects/Avondale Bend Project + P-12866 + MHK Projects/BW2 Tidal + P-14222 + MHK Projects/Bar Field Bend + P-12942 + MHK Projects/Barfield Point + P-13489 + MHK Projects/Bayou Latenache + P-13542 + MHK Projects/Belair Project + P-13125 + MHK Projects/Bondurant Chute + P-13477 + MHK Projects/Breeze Point + P-13480 +

328

ENERGY STAR Guide for Licensed Professionals | ENERGY STAR Buildings &  

NLE Websites -- All DOE Office Websites (Extended Search)

Guide for Licensed Professionals Guide for Licensed Professionals Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

329

Licensed reactor nuclear safety criteria applicable to DOE reactors  

SciTech Connect

This document is a compilation and source list of nuclear safety criteria that the Nuclear Regulatory Commission (NRC) applies to licensed reactors; it can be used by DOE and DOE contractors to identify NRC criteria to be evaluated for application to the DOE reactors under their cognizance. The criteria listed are those that are applied to the areas of nuclear safety addressed in the safety analysis report of a licensed reactor. They are derived from federal regulations, USNRC regulatory guides, Standard Review Plan (SRP) branch technical positions and appendices, and industry codes and standards.

Not Available

1993-11-01T23:59:59.000Z

330

FTCP Issue Papers | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issue Papers Issue Papers FTCP Issue Papers Document Number Subject Disposition FTCP-12-003 Supplemental Competencies Approved by FTCP Chair, December 19, 2012 FTCP-12-001 Use of "Expert Level" in Qualification Path Forward Approved by vote at May 15, 2012 meeting; to delete all reference to expert-level knowledge requirements in FAQS FTCP-10-003 Expert Competencies Pertaining to DOE Orders & Technical Standards Issue transitioned to FY 2011 FTCP Operational Plan Goal #2 FTCP-10-002 Expert-Level Knowledge Issue assigned to team lead by Debbie Monette to evaluate the expert competencies for possible re-classification. See FTCP-10-003. FTCP-10-001 FCTP Safeguards and Security Advisor Issue transitioned to FY 2010 Operational Plan Goal #3

331

The use for frequency-consequence curves in future reactor licensing  

E-Print Network (OSTI)

The licensing of nuclear power plants has focused until now on Light Water Reactors and has not incorporated systematically insights and benefits from Probabilistic Risk Assessment (PRA). With the goal of making the licensing ...

Debesse, Laurne

2007-01-01T23:59:59.000Z

332

A Process for Reducing the Licensing Burden for New Products Containing Depleted Uranium  

NLE Websites -- All DOE Office Websites (Extended Search)

3-01 3-01 A Process for Reducing the Licensing Burden for New Products Containing Depleted Uranium Environmental Assessment Division Argonne National Laboratory Operated by The University of Chicago, under Contract W-31-109-Eng-38, for the United States Department of Energy Argonne National Laboratory, a U.S. Department of Energy Office of Science laboratory, is operated by The University of Chicago under contract W-31-109-Eng-38. DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor The University of Chicago, nor any of their employees or officers, makes any warranty, express or implied, or assumes

333

San Francisco Operations Office  

Office of Legacy Management (LM)

San Francisco Operations Office San Francisco Operations Office 1333 Broadway Oakland, California 94612 Dr. Joseph 0. Ward, Chief Radiological Health Section Department of Health Services 744 P Street Sacramento, California, 95814 SUBJECT: Certification Docket of Gilman Hall Dear Dr. Ward: The Department of Energy (DOE) has completed and reviewed the remedial ac- tions of Gilman Hall located at the University of California, Berkeley, California. Based on this review, DOE certifies that the condition of Gilman Hall is radiologically acceptable for restricted use under the con- trols of the University of California's State General License 1333-62 pro- vided that the University's Office of Environmental Health and Safety con- tinues to survey Gilman Hall and monitor whenever remodeling or renovation

334

Licensing sentence-internal readings in english: an experimental study  

Science Conference Proceedings (OSTI)

Adjectives of comparison (AOCs) like same, different and similar can compare two elements sentence-internally, i.e., without referring to any previously introduced element. This reading is licensed only if a semantically plural NP ... Keywords: Bayesian statistics, acceptability judgments, adjectives of comparison, distributivity, pluralities

Adrian Brasoveanu; Jakub Dotla?il

2011-12-01T23:59:59.000Z

335

Office of Information Technology University of Minnesota 1 Software Licenses  

E-Print Network (OSTI)

, visit the Change Management website. Scheduled Maintenance The schedule of OIT maintenance windows is published on the System Status page. Should maintenance be required outside of the scheduled maintenanceSoftwareLicenseServer. If the maintenance window extends beyond anticipated end time, the System Status page will be updated accordingly

Amin, S. Massoud

336

Radiation Protection and Licensing FNAL Radiation Physics Team  

E-Print Network (OSTI)

/replace philosophy 8. Remote Handling capabilities 9. Alignment and Stability 10. Radioactive off-gas (especially shielded repair cells · Need remote handling capability · Problems during lifting and moving are difficult. January 13, 2012 Radiation Protection and Licensing #12;11 Repair Cell and Remote Handling capabilities

McDonald, Kirk

337

Objectives, characteristics and outcomes of university licensing: A survey of major U.S. universities  

E-Print Network (OSTI)

Abstract This paper describes results of our survey of licensing at 62 research universities. We consider ownership, income splits, stage of development, marketing, license policies and characteristics, goals of licensing and the role of the inventor in licensing. Based on these results we analyze the relationship between licensing outcomes and both the objectives of the TTO and the characteristics of the technologies. Patent applications grow one-to-one with disclosures, while sponsored research grows similarly with licenses executed. Royalties are typically larger the higher the quality of the faculty and the higher the fraction of licenses that are executed at latter stages of development. Sponsored research is more likely to be included in a license if the new technology is at an early stage of development or if the TTO evaluates it as important. We find that additional disclosures generate smaller percentage increases in licenses, and those increases in licenses generate smaller percentage increases in royalties. University licensing has increased dramatically since the passage of the Bayh-Dole Act in 1980, which gave universities the right to retain title to and license inventions resulting from federallysponsored

Jerry G. Thursby; Richard Jensen; Marie C. Thursby

2001-01-01T23:59:59.000Z

338

Real-time automatic license plate recognition for CCTV forensic applications  

Science Conference Proceedings (OSTI)

We propose an efficient real-time automatic license plate recognition (ALPR) framework, particularly designed to work on CCTV video footage obtained from cameras that are not dedicated to the use in ALPR. At present, in license plate detection, tracking ... Keywords: CCTV video footage, License plate recognition, Surveillance, Traffic monitoring, Video indexing

M. S. Sarfraz, A. Shahzad, Muhammad A. Elahi, M. Fraz, I. Zafar, E. A. Edirisinghe

2013-09-01T23:59:59.000Z

339

Hydrogen Delivery Options and Issues  

NLE Websites -- All DOE Office Websites (Extended Search)

Options and Issues Options and Issues Mark Paster DOE August, 2006 Scope * From the end point of central or distributed production (300 psi H2) to and including the dispenser at a refueling station or stationary power site - GH2 Pipelines and Trucks, LH2 Trucks, Carriers <$1.00/kg of Hydrogen by 2017 Hydrogen Delivery H2 Delivery Current Status * Technology - GH2 Tube Trailers: ~340 kg, ~2600 psi - LH2 Trucks: ~3900 kg - Pipelines: up to 1500 psi (~630 miles in the U.S.) - Refueling Site Operations (compression, storage dispensing): Demonstration projects * Cost (Does NOT include refueling Site Operations) - Trucks: $4-$12/kg - Pipeline: <$2/kg H2A Analysis * Consistent, comparable, transparent approach to hydrogen production and delivery cost analysis * Excel spreadsheet tools with common economic

340

Licenses Available in Energy & Utilities | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy and Utilities Energy and Utilities SHARE Energy and Utilities 200000741 Automatic Detection of Bone Fragments in Poultry 200000782 Droplet Acoustic Wave Sensors 200000784 Method for the Enhancement of Aqueous Cleaning Operations 200000785 Bulk Metallic Glass Surgical Tools and Orthopedic Implants 200000789 Device for Separating CO2 from Fossil Power Plant Emissions 200000791 Wheel Reaction Force Sensing Apparatus/Whole-Vehicle Brake Tester 200000796 Fossil Fuel Combined Cycle Power System 200000799 Method for Accelerated Curing of Coatings for Explosion Prevention and Other Needs Using Microwave Technology 200000807 Effective Switching Frequency Multiplier Inverter 200000809 Improved Response Microcantilever Thermal Detector 200000813 High Slot Utilization System for Electric Machines

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Challenges of Fusion Power Plant Licensing: Differences and Commonalities with Existing Systems  

SciTech Connect

At present, there are no regulatory guidelines to follow for US fusion power plant construction and operation. Thus far, the Department of Energy (DOE) has been regulating existing fusion experiments, following the 1996-1999 DOE Fusion Standards and using the spirit of the ASME (American Society of Mechanical Engineers) code. Considering this reality, a few options emerged for licensing ARIES-type power plants and the like. Developing new fusion-specific regulations stands out as the most logical option, but requires well-coordinated effort between DOE, regulatory agencies, and the fusion community with considerable funding and long lead-time. Nevertheless, a few recent developments seem promising: (1) The US Nuclear Regulatory Commission (NRC) plans to assert regulatory jurisdiction over commercial fusion devices, and (2) the ongoing effort within ASME will develop rules for the construction of fusion-energy-related components. The most recent NRC, ASME and fusion licensing developments are reviewed in this paper. In addition, an interesting comparison with ITER was made to foresee how US fusion power plants could leverage from ITER.

L. El-Guebaly; L. Cadwallader; W. Sowder

2011-08-01T23:59:59.000Z

342

The Standard Review Plan for Review of License Renewal Applications for Nuclear Power  

E-Print Network (OSTI)

Plants (SRP-LR) provides guidance to Nuclear Regulatory Commission staff reviewers in the Office of Nuclear Reactor Regulation. These reviewers perform safety reviews of applications to renew nuclear power plant licenses in accordance with Title 10 of the Code of Federal Regulations Part 54. The principal purposes of the SRP-LR are to ensure the quality and uniformity of staff reviews and to present a well-defined base from which to evaluate applicant programs and activities for the period of extended operation. The SRP-LR is also intended to make information about regulatory matters widely available, to enhance communication with interested members of the public and the nuclear power industry, and to improve public and industry understanding of the staff review process. The safety review is based primarily on the information provided by the applicant in a license renewal application. Each of the individual SRP-LR sections addresses (1) who performs the review, (2) the matters that are reviewed, (3) the basis for review, (4) the way the review is accomplished, and (5) the conclusions that are sought.

Power Plants

2005-01-01T23:59:59.000Z

343

Operating Practices Guidebook (OPG)  

Science Conference Proceedings (OSTI)

This guidebook is a summary of current practices concerning operation, maintenance, siting, and staffing of combustion turbine, combined cycle, and cogeneration equipment. Information obtained from both utility and independent generators addresses the important issues faced by operators, project planners, and business managers.

1995-05-12T23:59:59.000Z

344

Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors  

Science Conference Proceedings (OSTI)

This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC`s Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission in 1996.

NONE

1997-12-01T23:59:59.000Z

345

Office for Analysis and Evaluation of Operational Data. 1992 annual report: Nonreactors: Volume 7, No. 2  

Science Conference Proceedings (OSTI)

The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC`s Operations Center. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued for 1981--1992.

Not Available

1993-10-01T23:59:59.000Z

346

THE NRC HAS ISSUED Ati ACTION PLAN FOR CLEANUP OF 46 SfTES that;;ece  

Office of Legacy Management (LM)

NRC HAS ISSUED Ati ACTION PLAN FOR CLEANUP OF 46 SfTES that;;ece NRC HAS ISSUED Ati ACTION PLAN FOR CLEANUP OF 46 SfTES that;;ece :: ~,: : ..,.... ..,:y... included in the agency' s Site Decommissioning Managem&t Pian (SDMP) in.1990. The ., ,.;' -,; ;.L..z,. sites are all radioactive materials handling facilities in various stages of decommission- ~' ... ,' . .-_.... ..,: ,,~ ..,. -c : -: ing; some of them are slill under active Nuclear Regulatory Commission licenses,~some .~. . . . . . ...i.~ ,;::,: ' :-&-:' . -1.: : ;: _ :: .,,. >.r"!.-<,z...;::.~ ? ~' .._ .' l...' -i:i -::;.. c : of them were under licenses that are now terminated, and some were never licensed~, ,~: ,.~. ~~.. .,_. .i ' . In the Action Plan, which was published in the April 16 Federal Register, the NRC says' ;; *_: ._.:, :-.~:i:r~'

347

Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed  

NLE Websites -- All DOE Office Websites (Extended Search)

4: June 8, 2009 4: June 8, 2009 Vehicles per Licensed Driver Rising to someone by E-mail Share Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Facebook Tweet about Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Twitter Bookmark Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Google Bookmark Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Delicious Rank Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on Digg Find More places to share Vehicle Technologies Office: Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising on AddThis.com... Fact #574: June 8, 2009

348

GRR/Section 3-MT-d - Land Use License Process | Open Energy Information  

Open Energy Info (EERE)

d - Land Use License Process d - Land Use License Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-MT-d - Land Use License Process 03MTDLandUseLicenseProcess (1).pdf Click to View Fullscreen Contact Agencies Montana Department of Natural Resources & Conservation Regulations & Policies Surface Management Rule 36.25.103 Triggers None specified Click "Edit With Form" above to add content 03MTDLandUseLicenseProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The land use license is intended to be used for short-term use of state-owned lands. This license may be used for casual use of the lands

349

Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3-70). Volume 2, Public comments and NRC response  

Science Conference Proceedings (OSTI)

The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are co on, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility.

Zeitoun, A. [Science Applications International Corp., Germantown, MD (United States)

1994-08-01T23:59:59.000Z

350

Completion of decommissioning: Monitoring for site release and license termination  

SciTech Connect

To request termination of a license upon completion of dismantling or decommissioning activities, documenting any residual radioactivity to show that the levels are environmentally acceptable will be necessary. When the regulators approve the decommissioning plan, they establish what the release criteria for the decommissioned site will be at the time of the site release and license termination. The criteria are numeric guidelines for direct radiation in soils and on surfaces. If the regulatory body finds that the measured on-site values are below the guidelines, the site will be acceptable for unrestricted release (no radiological controls or future use). If areas are found above those values, more decontamination or cleanup of these areas may be required unless the regulatory body grants an exemption.

Boing, L.E.

1997-08-01T23:59:59.000Z

351

Investing in the Energy Future: An Industry Guide to Licensing Technologies at the National Renewable Energy Laboratory (NREL) (Brochure)  

Science Conference Proceedings (OSTI)

Provides an overview of NREL's licensing opportunities and processes, and commercialization programs.

Not Available

2010-09-01T23:59:59.000Z

352

APS User News-at-a-Glance Issue 18  

NLE Websites -- All DOE Office Websites (Extended Search)

Holiday Shutdown Affects Many Argonne Services Operations Update: APS Achieves 99% Availability APS User News-at-a-Glance Issue 18: December 20, 2002 1. Message from Murray...

353

DOE Issues Request for Proposals Seeking a Contractor to Manage...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm...

354

Greece licensing round to focus on western sedimentary basins  

SciTech Connect

New opportunities for international oil companies to explore for hydrocarbons in Greece will emerge shortly. Parliament ratified a new petroleum law in January 1995, and DEP-EKY SA will undertake an international licensing round for offshore-onshore areas mainly in western Greece during second half 1995. The paper describes the fold and thrust belt of western Greece; the Katakolon oil field; the tertiary basins of eastern Greece; the Prinos and Prinos North oil fields; and the Epanomi gas field.

Roussos, N.; Marnelis, F. (Public Petroleum Corp. of Greece, Athens (Greece))

1995-03-06T23:59:59.000Z

355

Albert R Meyer February 13, 2012 This work is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported License.  

E-Print Network (OSTI)

2/11/12 1 Lec 2M.1 Albert R Meyer February 13, 2012 This work is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 3.0 Unported License. Mathematics for Computer Science MIT 6.042J/18.062J The Well Ordering Principle, III Lec 2M.2 Albert R Meyer February 13, 2012 Geometric sums

356

Proposed License Amendments "Revised Pressure/Temperature (P/T) Curves, and  

E-Print Network (OSTI)

(FPL) requests that Appendix A of Facility Operating Licenses DPR-31 and DPR-41 for Turkey Point Units 3 and 4 be amended to extend the heatup, cooldown, and inservice test limitations for the Reactor Coolant System (RCS). The present pressure/temperature (P/T) limits specified in Technical Specification (TS) 3/4.4.9, and in TS Figures 3.4-2, 3.4-3 and 3.4-4 apply for operation up to 19 Effective Full Power Years (EFPY). The proposed amendments will extend the service period for the new P/T limits to a maximum of 32 EFPY. The proposed amendments also revise TS 3.4.9.3, Cold Overpressure Mitigation System (COMS) setpoints. COMS is the Westinghouse version of Low Temperature Overpressure Protection (LTOP). The maximum permissible Power Operated Relief Valve (PORV) setpoint for low temperature operation of the RCS is being changed from 415 + 15 psig to < 561 psig, which includes instrument uncertainty of 70 psig, as a result of the P/T limit changes. The enable temperature for the

In Accordance Cfr; Florida Power; Light Company

2000-01-01T23:59:59.000Z

357

ISSUES MANAGEMENT PROGRAM MANUAL  

Science Conference Proceedings (OSTI)

The Lawrence Berkeley National Laboratory (LBNL) Issues Management Program encompasses the continuous monitoring of work programs, performance and safety to promptly identify issues to determine their risk and significance, their causes, and to identify and effectively implement corrective actions to ensure successful resolution and prevent the same or similar problems from occurring. This document describes the LBNL Issues Management Program and prescribes the process for issues identification, tracking, resolution, closure, validation, and effectiveness of corrective actions. Issues that are governed by this program include program and performance deficiencies or nonconformances that may be identified through employee discovery, internal or external oversight assessment findings, suggested process improvements and associated actions that require formal corrective action. Issues may also be identified in and/or may result in Root Cause Analysis (RCA) reports, Price Anderson Amendment Act (PAAA) reports, Occurrence Reporting and Processing System (ORPS) reports, Accident Investigation reports, assessment reports, and External Oversight reports. The scope of these issues may include issues of both high and low significance as well as adverse conditions that meet the reporting requirements of the University of California (UC) Assurance Plan for LBNL or other reporting entities (e.g., U.S. Environmental Protection Agency, U.S. Department of Energy). Issues that are found as a result of a walk-around or workspace inspection that can be immediately corrected or fixed are exempt from the requirements of this document.

Gravois, Melanie

2007-06-27T23:59:59.000Z

358

L This Issue:  

Science Conference Proceedings (OSTI)

Page 1. Volume 92, Number 6, November-December 1987 Journal of Research of the National Bureau of Standards L This Issue: Departments ...

2010-04-08T23:59:59.000Z

359

Diversity Issues Committee - History  

NLE Websites -- All DOE Office Websites (Extended Search)

Events leading to formation of Diversity Issues Committee Visit by American Physical Society Committee on the Status of Women in Physics (CSWP) to assess the work environment at...

360

Inside This Issue  

NLE Websites -- All DOE Office Websites (Extended Search)

Inside This Issue 1995 CAT Calendar APS Compton Award Established APSUO Seeks Nominees for Steering Committee Beamline Commissioning Workshop Held Commissioning of User Beamlines...

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Breakout Session I OCRWM Issues  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I: OCRWM Issues I: OCRWM Issues Presented to: Transportation External Coordination Working Group Presented by: Frank Moussa Office of Logistics Management February 7, 2008 San Antonio, Texas 2 Topics of Discussion * National Transportation Plan (NTP) * Improving methods of communication and outreach * Section 180(c) of the Nuclear Waste Policy Act 3 Development of the NTP * Developing the NTP is one of four strategic Program objectives * Elements of the plan include - Requirements - Infrastructure development - Stakeholder involvement - Operations planning * Stakeholder input has been incorporated - Impacts of FY 08 funding and future profiles are being incorporated - NTP will be published for public comment when integrated planning baseline decisions are finalized 4 Total HAZMAT Shipments Flammable/Combustible Liquid (Class 3) -

362

Preparing to Submit a License Application for Yucca Mountain  

Science Conference Proceedings (OSTI)

In 1982, the U.S. Congress passed the Nuclear Waste Policy Act, a Federal law that established U.S. policy for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Congress amended the Act in 1987, directing the Department of Energy to study only Yucca Mountain, Nevada as the site for a permanent geologic repository. As the law mandated, the Department evaluated Yucca Mountain to determine its suitability as the site for a permanent geologic repository. Decades of scientific studies demonstrated that Yucca Mountain would protect workers, the public, and the environment during the time that a repository would be operating and for tens of thousands of years after closure of the repository. A repository at this remote site would also: preserve the quality of the environment; allow the environmental cleanup of Cold War weapons facilities; provide the nation with additional protection from acts of terrorism; and support a sound energy policy. Throughout the scientific evaluation of Yucca Mountain, there has been no evidence to disqualify Yucca Mountain as a suitable site for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Upon completion of site characterization, the Secretary of Energy considered the results and concluded that a repository at Yucca Mountain would perform in a manner that protects public health and safety. The Secretary recommended the site to the President in February 2002; the President agreed and recommended to Congress that the site be approved. The Governor of Nevada submitted a notice of disapproval, and both houses of Congress acted to override the disapproval. In July 2002, the President's approval allowed the Department to begin the process of submittal of a license application for Yucca Mountain as the site for the nation's first repository for spent nuclear fuel and high-level radioactive waste. Yucca Mountain is located on federal land in Nye County in southern Nevada, an arid region of the United States, approximately 100 miles (160 kilometers) northwest of Las Vegas (Figure 1). The location is remote from population centers, and there are no permanent residents within approximately 14 miles (23 km) of the site. Overall, Nye County has a population density of about two persons per square mile (two persons per 2.5 square km); in the vicinity of Yucca Mountain, it is significantly less. Yucca Mountain is a series of north-south-trending ridges extending approximately 25 miles (40 km), and consists of successive layers of fine-grained volcanic tuffs, millions of years old, underlain by older carbonate rocks. The alternating layers of welded and nonwelded volcanic tuffs have differing hydrologic properties that significantly impact the manner in which water moves through the mountain. The repository horizon will be in welded tuff located in the unsaturated zone, more than 1,000 feet (300 meters) above the water table in the present-day climate, and is expected to remain well above the water table during wetter future climate conditions. Future meteorology and climatology at Yucca Mountain are important elements in understanding the amount of water available to potentially interact with the waste.

W.J. Arthur; M.D. Voegele

2005-03-14T23:59:59.000Z

363

Nondestructive Evaluation Program Issue Management Tables: Revision 0  

Science Conference Proceedings (OSTI)

Ongoing issues related to non-destructive examination of nuclear plant components have resulted in the need for a summary tool to assist in tracking and prioritizing NDE-related research and development (R&D) needs.BackgroundA comprehensive, integrated understanding of materials issues and management options is a fundamental consideration in the development of overall plant business and operating strategies. Issue ...

2012-12-20T23:59:59.000Z

364

U-047: Siemens Automation License Manager Bugs Let Remote Users Deny  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Siemens Automation License Manager Bugs Let Remote Users 7: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code U-047: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code November 29, 2011 - 9:00am Addthis PROBLEM: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code. PLATFORM: Siemens Automation License Manager 500.0.122.1 ABSTRACT: Several vulnerabilities were reported in Siemens Automation License Manager. reference LINKS: SecurityTracker Alert ID: 1026354 Bugtraq Siemens Advisory Services IMPACT ASSESSMENT: Medium Discussion: A remote user can execute arbitrary code on the target system. A remote user can cause denial of service conditions. A remote user can send specially crafted *_licensekey commands to trigger a

365

GRR/Section 12-HI-a - Habitat Conservation Plan and Incidental Take License  

Open Energy Info (EERE)

2-HI-a - Habitat Conservation Plan and Incidental Take License 2-HI-a - Habitat Conservation Plan and Incidental Take License < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-HI-a - Habitat Conservation Plan and Incidental Take License 12HIAHabitatConservationPlanAndIncidentalTakeLicense (3).pdf Click to View Fullscreen Contact Agencies Hawaii Department of Land and Natural Resources Division of Forestry and Wildlife Regulations & Policies Hawaii Revised Statutes 195D-21 Triggers None specified Click "Edit With Form" above to add content 12HIAHabitatConservationPlanAndIncidentalTakeLicense (3).pdf 12HIAHabitatConservationPlanAndIncidentalTakeLicense (3).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

366

OIA: Office of Contract Assurance: Assurance Systems: Issues Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Issues Management Program Issues Management Program Overview The Lawrence Berkeley National Laboratory (LBNL) Issues Management Program encompasses issue identification, causal analysis, corrective action development, tracking and implementation, and corrective action verification of completion and validation of effectiveness. The program also includes monitoring and analysis of adverse trends and conditions, and sharing of lessons learned and best practices. The issues that are relevant to this program pertain to any safety or operational event, condition, or circumstance that: results or could result in injury, damage, loss, or noncompliance (Example: actual or near miss incidents); represents a program, safety or operational deficiency (Example: audit or assessment finding, performance weakness); or

367

PNNL: Pacific Northwest Technology Today - Issue Archive  

NLE Websites -- All DOE Office Websites (Extended Search)

Community Outreach Community Outreach Issue Archive Volume 7, Issue 2 Volume 7, Issue 1 Volume 6, Issue 6 Volume 6, Issue 5 Volume 6, Issue 4 Volume 6, Issue 3 Volume 6, Issue 2 Volume 6, Issue 1 Volume 5, Issue 5 Volume 5, Issue 4 Volume 5, Issue 3 Volume 5, Issue 2 Volume 5, Issue 1 Volume 4, Issue 4 Volume 4, Issue 5 Volume 4, Issue 4 Volume 4, Issue 3 Volume 3, Issue 2 Volume 3, Issue 1 Volume 2, Issue 8 Volume 2, Issue 7 Volume 2, Issue 6 Volume 2, Issue 5 Volume 2, Issue 4 Volume 2, Issue 3 Volume 2, Issue 2 Volume 2, Issue 1 Volume 1, Issue 4 Volume 1, Issue 3 Volume 1, Issue 2 Volume 1, Issue 1 Community & Regional Outreach Home Pacific Northwest Technology Today eNewsletter Current Issue Issue Archive Subscribe/Unsubscribe Inquiries Speakers and Seminars Community Science & Technology Seminar Series

368

DOE Issues Noncompliance Notices | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Issues Noncompliance Notices Issues Noncompliance Notices DOE Issues Noncompliance Notices November 1, 2011 - 12:23pm Addthis The U.S. Department of Energy's Office of Enforcement issued a Notice of Noncompliance Determination to Haier America Trading, L.L.C., regarding Haier compact chest freezer model number HNCM070, which is manufactured in China. DOE tested four units of the freezer and determined that the units consumed energy at the rates of 363, 341, 352, and 387 kWh/yr, exceeding the federal limit by an average of 32 percent. The Office of Enforcement also issued a Notice of Noncompliance Determination to Goodman Manufacturing regarding commercial package central air conditioner model CPC180XXX3BXXXAA. The federal energy conservation standard requires that commercial package central air conditioners operate

369

DOE Issues Noncompliance Notices | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Noncompliance Notices DOE Issues Noncompliance Notices DOE Issues Noncompliance Notices November 1, 2011 - 12:23pm Addthis The U.S. Department of Energy's Office of Enforcement issued a Notice of Noncompliance Determination to Haier America Trading, L.L.C., regarding Haier compact chest freezer model number HNCM070, which is manufactured in China. DOE tested four units of the freezer and determined that the units consumed energy at the rates of 363, 341, 352, and 387 kWh/yr, exceeding the federal limit by an average of 32 percent. The Office of Enforcement also issued a Notice of Noncompliance Determination to Goodman Manufacturing regarding commercial package central air conditioner model CPC180XXX3BXXXAA. The federal energy conservation standard requires that commercial package central air conditioners operate

370

The debate over re-licensing the Vermont Yankee nuclear power plant  

Science Conference Proceedings (OSTI)

In 2009, the NRC's Atomic Safety and Licensing Board approved a 20-year license extension for the Vermont Yankee Nuclear Power plant. Less than seven months later, the Vermont State Senate voted 26-4 to block the required certificate for public good. How did a plant seen as likely to be re-licensed become the first in 20 years to be rejected in a public vote? (author)

Watts, Richard; Hines, Paul; Dowds, Jonathan

2010-05-15T23:59:59.000Z

371

Proceedings: 2004 EPRI Topical Workshop - License Termination Plans/Final Site Release  

Science Conference Proceedings (OSTI)

One of the final challenges in plant decommissioning is that of license termination and final site release. The EPRI Decommissioning - License Termination and Final Site Release Workshop was the tenth in a series designed to aid utility personnel in decommissioning nuclear power plants. This workshop focused on specific aspects of license termination activities and final site release as they relate to decommissioning. The information presented will update utilities on developments and experience related ...

2005-09-16T23:59:59.000Z

372

Management of the Licensed Bases of Advanced Nuclear Plants: Proof of Approach  

Science Conference Proceedings (OSTI)

Prospective Advanced Nuclear Plant (ANP) owners must have high confidence that the integrity of the licensed bases (LB) of a plant will be effectively maintained over its lifecycle. Currently, licensing engineers use text retrieval systems, database managers, and checklists to access, update, and maintain vast and disparate licensing information libraries. This project adopted and demonstrated a "twin-engine" approach that integrates a program from the emerging class of concept searching tools with a mod...

2000-08-28T23:59:59.000Z

373

Evaluation of Thermal Fatigue Effects on Systems Requiring Aging Management Review for License Renewal for the Calvert Cliffs Nuclear Power Plant  

Science Conference Proceedings (OSTI)

In recent years, the nuclear power industry has devoted significant attention to metal fatigue and its impact on the design qualification and serviceability of operating components. This study provides a pilot plant demonstration of the current industry technical position on fatigue evaluation for license renewal, specifically addressing reactor water environmental effects. It also develops a technical evaluation method for determining fatigue life adequacy in a feedwater piping system, a pressurizer sur...

1998-02-25T23:59:59.000Z

374

ISSUES MANAGEMENT PROGRAM MANUAL  

E-Print Network (OSTI)

Conduct of Operations Requirements for DOE Facilities UCthat does not address all appropriate the requirements,

Gravois, Melanie

2007-01-01T23:59:59.000Z

375

Radon-222 emissions and control practices for licensed uranium mills and their associated tailings piles. Final report  

SciTech Connect

The report is organized into five main sections. The conclusions of the effort are summarized in Chapter 2. A general description of current milling and tailings management practices and a summary of the site-specific characteristics of operating and standby uranium mills are contained in Chapter-3. The sources and emission rates of radon-222 at licensed mills and their associated tailings piles are contained in Chapter 4 along with the results of an effort to develop generic procedures to estimate radon-222 emissions for milling operations and tailings disposal. Control practices that are being or could be applied to the milling operation and tailings disposal areas and their estimated cost and effectiveness in reducing radon-222 emissions are presented in Chapter 5. The appendices contain detailed information on mill site data and emission estimates.

Not Available

1985-06-01T23:59:59.000Z

376

Natural gas 1998: Issues and trends  

Science Conference Proceedings (OSTI)

Natural Gas 1998: Issues and Trends provides a summary of the latest data and information relating to the US natural gas industry, including prices, production, transmission, consumption, and the financial and environmental aspects of the industry. The report consists of seven chapters and five appendices. Chapter 1 presents a summary of various data trends and key issues in today`s natural gas industry and examines some of the emerging trends. Chapters 2 through 7 focus on specific areas or segments of the industry, highlighting some of the issues associated with the impact of natural gas operations on the environment. 57 figs., 18 tabs.

NONE

1999-06-01T23:59:59.000Z

377

RADIOLOGICAL CRITERIA FOR LICENSE TERMINATION OF URANIUM RECOVERY FACILITIES  

E-Print Network (OSTI)

radiological criteria for building surfaces and radionuclides other than radium in soil, for termination of uranium recovery licenses. SUMMARY: In a Staff Requirements Memorandum (SRM) on SECY-98-084, dated August 11, 1998 (Attachment 1), the Commission indicated that it did not object to the staff's recommendation to use the radium benchmark dose in developing a final rule applicable to uranium recovery licensees. The final rule addresses radiological criteria for decommissioning land and buildings required for license termination for uranium recovery facilities, e.g., uranium mills and in situ leach facilities (ISLs). The final rule will provide a clear and consistent regulatory basis for determining the extent to which lands and structures can be considered to be decommissioned. BACKGROUND: On August 22, 1994 (59 FR 43200), the U.S. Nuclear Regulatory Commission (NRC) published a proposed rule for comment in the Federal Register, to amend 10 CFR Part 20, "Standards for Protection Against Radiation, " to include radiological criteria for decommissioning as subpart E. The proposed rule applied to uranium mill facilities and other NRC licensees, but did not apply to mill tailings disposal or to soil radium cleanup at mills because the radiological criteria for these activities are regulated under 10 CFR Part 40, Appendix A. Some commenters recommended that the rule exempt conventional thorium and uranium mill facilities and ISLs. In SECY-97-046A, dated March 28, 1997, entitled "Final Rule on Radiological Criteria for License Termination, " the staff recommended that the final rule indicate that for uranium and thorium mill facilities the cleanup of radionuclides other than radium from soil and buildings must result in a dose no greater than the dose resulting from the cleanup of radium-contaminated soil (benchmark

William D. Travers /s

1999-01-01T23:59:59.000Z

378

(Draft was issued as DG-1106) ASSURING THE AVAILABILITY OF FUNDS FOR  

E-Print Network (OSTI)

Regulatory guides are issued to describe and make available to the public such information as methods acceptable to the NRC staff for implementing specific parts of the NRCs regulations, techniques used by the staff in evaluating specific problems or postulated accidents, and data needed by the NRC staff in its review of applications for permits and licenses. Regulatory guides are not substitutes for regulations, and compliance with them is not required. Methods and solutions different from those set out in the guides will be acceptable if they provide a basis for the findings requisite to the issuance or continuance of a permit or license by the Commission. This guide was issued after consideration of comments received from the public. Comments and suggestions for improvements in these guides are encouraged at all times, and guides will be revised, as appropriate, to accommodate comments and to reflect new information or experience. Written comments may be

Decommissioning Nuclear Reactors

2002-01-01T23:59:59.000Z

379

TransForum v8n2 - DeNOX Catalyst License  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Fuel Technologies Gets Worldwide License for Argonne-developed Diesel DeNOX Catalyst Argonne chemist Chris Marshall (front) displays a container of the catalyst while...

380

SAS4A/SASSYS-1 Educational/Nonprofit Software License Agreement  

1 SAS4A/SASSYS-1 EDUCATIONAL/NON-PROFIT SOFTWARE LICENSE AGREEMENT. This Agreement, is made between the UChicago Argonne, LLC asoperator of Argonne ...

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

JGI - Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations The Operations Department sees to it that JGI has the best possible facilities and support, ensuring that its operations are conducted in accordance with the...

382

Power Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Operations Outage Coordination Standards of Conduct Transmission Planning You are here: SN Home page > Power Operations Power Operations Western's Sierra Nevada Region...

383

Security & Defense Licenses Available | Tech Transfer | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Available Technologies Available Technologies Analytical Instrumentation Chemicals Detectors and Sensors Energy and Utilities Healthcare and Biology Information Technology and Communications Manufacturing Materials Security and Defense Transportation Partnerships Home | Connect with ORNL | For Industry | Partnerships | Technology Licensing | Available Technologies | Security and Defense SHARE Security and Defense 200401423 Synthesis Method for Stable Colloids of "Naked" Metal Nanocrystals 200501549 Enhanced Detection of Toxic Agents 200501614 Robust Low-Frequency Spread-Spectrum Navigation System (Related ID # 200601627) 200501640 Secure Identification of Textiles and Other Consumer Products 200701980 Cyberspace Security Econometrics System 200701995 An Intrusion Detection System Using Quantum-mechanical

384

Safety and licensing for small and medium power reactors  

SciTech Connect

Proposed new concepts for small and medium power reactors differ substantially from traditional Light Water Reactors (LWRs). Although designers have a large base of experience in safety and licensing, much of it is not relevant to new concepts. It can be a disadvantage if regulators apply LWR rules directly. A fresh start is appropriate. The extensive interactions between industry, regulators, and the public complicates but may enhance safety. It is basic to recognize the features that distinguish nuclear energy safety from that for other industries. These features include: nuclear reactivity, fission product radiation, and radioactive decay heat. Small and medium power reactors offer potential advantages over LWRs, particularly for reactivity and decay heat.

Trauger, D.B.

1987-01-01T23:59:59.000Z

385

Regulatory Reform and License Termination Planning in Decommissioning  

SciTech Connect

Decommissioning of commercial nuclear power plants (NPPs) must be safe and cost-effective and consider the needs of a wide range of stakeholders. The creative tension among these objectives has provided opportunities to reform the way these plants are regulated and managed in decommissioning. Enlightened and visionary leaders from the U.S. Nuclear Regulatory Commission (NRC) and industry are seizing these opportunities to create new paradigms for risk-informed regulation; creative stakeholder involvement; and effective, end-state focused, license termination planning.

Michael J. Meisner

2000-06-04T23:59:59.000Z

386

NRC Consent to Indirect License Transfer/Threshold Determination- Merger  

E-Print Network (OSTI)

Company ("CY"), and Yankee Atomic Electric Company ("YR") (each a "Yankee Company," and together, "the Yankee Companies"), hereby respond to the Nuclear Regulatory Commission ("NRC") Third Request for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination (TAC Nos. L24496, L24497, and L24498) ("RAI 3") received by the Yankee Companies on August 5, 2011. If you have questions or require additional information, please contact me or Joe Fay at (207) 350-0300. Sincerely, Wayne Norton

The Yankee Companies

2011-01-01T23:59:59.000Z

387

Government Operation  

Science Conference Proceedings (OSTI)

... System), A high performance computer (48 GB RAM) is needed ... analysis,. ... Veracity (Robustness Issues, semantics), Failover of soft realtime analyses. ...

2013-09-26T23:59:59.000Z

388

Operating Guidelines Narrative.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Competitive Sourcing Program Operating Guidelines Issued under authority of: Competitive Sourcing Executive Steering Group July 1, 2004 DOE Competitive Sourcing Program OPERATING GUIDELINES (CS-OG-01) i COMPETITIVE SOURCING PROGRAM OPERATING GUIDELINES Table of Contents 1. REFERENCES ................................................................................................................................... 1 2. PURPOSE ........................................................................................................................................... 1 3. APPLICABILITY AND SCOPE ......................................................................................................

389

Operating Guidelines Narrative.DOC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Competitive Sourcing Program Operating Guidelines Issued under authority of: Competitive Sourcing Executive Steering Group July 1, 2004 DOE Competitive Sourcing Program OPERATING GUIDELINES (CS-OG-01) i COMPETITIVE SOURCING PROGRAM OPERATING GUIDELINES Table of Contents 1. REFERENCES ................................................................................................................................... 1 2. PURPOSE ........................................................................................................................................... 1 3. APPLICABILITY AND SCOPE ......................................................................................................

390

Office for Analysis and Evaluation of Operational Data 1994-FY 95 annual report. Volume 9, Number 2  

SciTech Connect

This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during CY 1994 and FY 1995. The report is published in three parts. NUREG-1272, Vol. 9, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC`s Operations Center. NUREG-1272, Vol. 9, No. 2, covers nuclear materials and presents a review of the events and concerns associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from 1980 through FY 1995. NUREG-1272, Vol. 9, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission.

NONE

1996-09-01T23:59:59.000Z

391

Readiness Issues for Emergency Response Instrumentation  

Science Conference Proceedings (OSTI)

Issues in maintaining readiness of instruments for deployment and use in emergency response situation often differ from those in maintaining instruments for normal operations. Confunding circumstances include use of non-availability of check sources, ensuring instruments are always in calibration and operable, possible use of instruments in different climates, packaging of instrumentation for deployment, transport of instrumentation and check sources, and ensuring users are familiar with instruments. Methods and procedures for addressing these issues are presented. Instrumentation used for survey, in situ measurements, electronic dosimetry, and air conditioning are discussed.

C.A. Riland; D.R. Bowman; R.J. Tighe

1999-03-01T23:59:59.000Z

392

A A S BA IMPORTANT ISSUES W BOOK TWO O  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

i i * A * A S BA IMPORTANT ISSUES W BOOK TWO O * - U.S. Department of Energy, Transition 2008 - HOT Issue Papers Section 1 - Energy 1-1 Carbon Capture and Storage (CCS) * CCS could be developed and accelerated to meet aggressive C02 emissions goals. This strategy includes FutureGen and Clean Coal Power Initiative (CCPI). * July 2009 - Select CCPI recipients (closes 1/15/09) * December 2009 - Award FutureGen based on a December 2008 selection 1-2 Next Generation Nuclear Plant (NGNP) Partnership with Industry * The Department is working to establish a partnership with industry on the design, licensing, and demonstration of the NGNP. An NGNP is a commercial scale (500-600 MWe) Generation IV version of a Very High Temperature Reactor (VHTR) which has the ability to produce electricity

393

Volume III, Issue 9  

NLE Websites -- All DOE Office Websites (Extended Search)

Issue 9 September 2013 your connection to Brookhaven Lab's world-class science First NSLS-II Beamlines Begin to Take Shape BNL's National Synchrotron Light Source II will be a...

394

The Hurricane Intensity Issue  

Science Conference Proceedings (OSTI)

The intensity issue of hurricanes is addressed in this paper using the angular momentum budget of a hurricane in storm-relative cylindrical coordinates and a scale-interaction approach. In the angular momentum budget in storm-relative coordinates,...

T. N. Krishnamurti; S. Pattnaik; L. Stefanova; T. S. V. Vijaya Kumar; B. P. Mackey; A. J. OShay; Richard J. Pasch

2005-07-01T23:59:59.000Z

395

ISSUES MANAGEMENT PROGRAM MANUAL  

E-Print Network (OSTI)

ISSUES MANAGEMENT PROGRAM MANUAL LBNL/PUB-5519 (1), Rev. 0and Analysis Program Manual. LBNL/PUB-5519 (1), Rev. 0the Regulations and Procedures Manual (RPM): CATS database o

Gravois, Melanie

2007-01-01T23:59:59.000Z

396

Biofuels Issues and Trends  

U.S. Energy Information Administration (EIA) Indexed Site

Biofuels Issues and Trends Biofuels Issues and Trends October 2012 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | Biofuels Issues and Trends i This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States Government. The views in this report therefore should not be construed as representing those of the Department of Energy or other Federal agencies. October 2012 U.S. Energy Information Administration | Biofuels Issues and Trends ii Table of Contents

397

Gas reactor international cooperative program interim report: United States/Federal Republic of Germany nuclear licensing comparison  

SciTech Connect

In order to compare US and FRG Nuclear Licensing, a summary description of United States Nuclear Licensing is provided as a basis. This is followed by detailed information on the participants in the Nuclear Licensing process in the Federal Republic of Germany (FRG). FRG licensing procedures are described and the rules and regulations imposed are summarized. The status of gas reactor licensing in both the U.S. and the FRG is outlined and overall conclusions are drawn as to the major licensing differences. An appendix describes the most important technical differences between US and FRG criteria.

1978-09-01T23:59:59.000Z

398

Sodium fast reactor safety and licensing research plan. Volume I.  

SciTech Connect

This report proposes potential research priorities for the Department of Energy (DOE) with the intent of improving the licensability of the Sodium Fast Reactor (SFR). In support of this project, five panels were tasked with identifying potential safety-related gaps in available information, data, and models needed to support the licensing of a SFR. The areas examined were sodium technology, accident sequences and initiators, source term characterization, codes and methods, and fuels and materials. It is the intent of this report to utilize a structured and transparent process that incorporates feedback from all interested stakeholders to suggest future funding priorities for the SFR research and development. While numerous gaps were identified, two cross-cutting gaps related to knowledge preservation were agreed upon by all panels and should be addressed in the near future. The first gap is a need to re-evaluate the current procedures for removing the Applied Technology designation from old documents. The second cross-cutting gap is the need for a robust Knowledge Management and Preservation system in all SFR research areas. Closure of these and the other identified gaps will require both a reprioritization of funding within DOE as well as a re-evaluation of existing bureaucratic procedures within the DOE associated with Applied Technology and Knowledge Management.

Sofu, Tanju (Argonne National Laboratory, Argonne, IL); LaChance, Jeffrey L.; Bari, R. (Brokhaven National Laboratory Upton, NY); Wigeland, Roald (Idaho National Laboratory, Idaho Falls, ID); Denman, Matthew R.; Flanagan, George F. (Oak Ridge National Laboratory, Oak Ridge, TN)

2012-05-01T23:59:59.000Z

399

Oconee Electrical Component Integrated Plant Assessment and Time Limited Aging Analyses for License Renewal: Revision 1  

Science Conference Proceedings (OSTI)

Duke Power Co. and Baltimore Gas and Electric Co. were the first two utilities to apply for and obtain license renewal for their nuclear units. This report is one in a series of EPRI reports providing the technical basis for the Oconee and Calvert Cliffs License Renewal Applications.

2000-08-10T23:59:59.000Z

400

ORNL's alumina-forming austenitic alloy family licensed to Carpenter Technology Corp.  

E-Print Network (OSTI)

ORNL's alumina-forming austenitic alloy family licensed to Carpenter Technology Corp. Carpenter Technology Corp. has licensed an alumina-forming austenitic (AFA) stainless steel alloy developed under technology from the initial conception and alloy design stage to the first successful prototype alloy

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Summary report on safety and licensing strategy support for the ABR prototype.  

SciTech Connect

Argonne National Laboratory is providing support to the US Department of Energy in the Global Nuclear Energy Partnership (GNEP) in certification of an advanced, sodium-cooled fast reactor. The reactor is to be constructed as a prototype for future commercial power reactors that will produce electricity while consuming actinides recovered from light water reactor spent fuel. This prototype reactor has been called the Advanced Burner Reactor, or ABR, and is now often referred to as the advanced recycle reactor. As part of its activities, Argonne is providing technical services to assist definition of a safety and licensing strategy for the ABR prototype, and to further implementation of the strategy. In FY06, an organizational meeting was held for DOE and its laboratory contractors to discuss licensing alternatives and review previous licensing experience for the Fast Flux Test Facility (FFTF) and the Clinch River Breeder Reactor Plant (CRBRP). Near the end of FY06, a report summarizing the discussions and conclusions was written. One of the top-level conclusions recorded in the report was a recommendation to follow a licensing strategy that included the US Nuclear Regulatory Commission (NRC) as the regulatory review and licensing authority. In FY07, activities ar Argonne to support safety and licensing progress have continued. These activities have focused on further evaluation of licensing alternatives; assessment of design, analysis, and documentation implications of licensing paths; and initial technical interactions with the Nuclear Regulatory Commission. This report summarizes FY07 activities.

Cahalan, J. E.; Nuclear Engineering Division

2007-09-18T23:59:59.000Z

402

Who Is Selling the Ivory Tower? Sources of Growth in University Licensing  

Science Conference Proceedings (OSTI)

Historically, commercial use of university research has been viewed in terms of spillovers. Recently, there has been a dramatic increase in technology transfer through licensing as universities attempt to appropriate the returns from faculty research. ... Keywords: Entrepreneurial activity, Invention disclosures, Patents, University licensing

Jerry G. Thursby; Marie C. Thursby

2002-01-01T23:59:59.000Z

403

15.769 Operations Strategy, Fall 2005  

E-Print Network (OSTI)

The class provides a unifying framework for analyzing strategic issues in manufacturing and service operations. Relationships between manufacturing and service companies and their suppliers, customers, and competitors are ...

Rosenfield, Donald

404

Modeling and Simulation of HVAC Faulty Operations and Performance...  

NLE Websites -- All DOE Office Websites (Extended Search)

Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues Title Modeling and Simulation of HVAC Faulty Operations and Performance...

405

Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization March 23, 2011 - 1:00pm Addthis Washington, DC - Two new patented sorbents used for carbon dioxide (CO2) capture from coal-based power plants have moved closer to commercialization as a result of a licensing agreement between the Office of Fossil Energy's (FE) National Energy Technology Laboratory (NETL) and ADA Environmental Solutions (ADA-ES). The nonexclusive agreement facilitates negotiations on intellectual property rights, protects proprietary information, and grants non-exclusive licensing of the new technology. Under federal regulations, NETL is authorized to obtain, maintain, and own patent protection for its

406

Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization March 23, 2011 - 1:00pm Addthis Washington, DC - Two new patented sorbents used for carbon dioxide (CO2) capture from coal-based power plants have moved closer to commercialization as a result of a licensing agreement between the Office of Fossil Energy's (FE) National Energy Technology Laboratory (NETL) and ADA Environmental Solutions (ADA-ES). The nonexclusive agreement facilitates negotiations on intellectual property rights, protects proprietary information, and grants non-exclusive licensing of the new technology. Under federal regulations, NETL is authorized to obtain, maintain, and own patent protection for its

407

UNITED STATES OF AMERICA ATOMIC ENERGY COMMISSION APPLICATION FORAEC LICENSE TO  

Office of Legacy Management (LM)

OF AMERICA OF AMERICA ATOMIC ENERGY COMMISSION APPLICATION FORAEC LICENSE TO TRANSFER,DELIVER,EXPORT,OR RECEIVE URANIUM ORTHORIUM SOURCE MATERIAL Pursuant to Code of Federal Regulations. Title II- Atomic Energy. Part IO-Control of Source Material Form approved Budget Bureau No. 3%RO02.2. 2. PREVIOUS AEC LICENSE NUMBER, IF ANY. R-103 _..._............_.~_~~......~~~.....~.. INSTRUCTIONS File two (2) copies of this application with the U. S. Atomic Energy Commission, P. 0. Box 30, Ansonia Station, New York 23, N. Y. This application may be used for an original license or for the renewal of a license. In the case of a rrnewal, this application should be received by the Commission on or before 30 days before the expiration of the previous license. Complete blocks 1, 2, 3, 9. and if

408

Stability issues for dynamic traffic assignment  

Science Conference Proceedings (OSTI)

This paper explores stability issues for operational route guidance control strategies for vehicular traffic networks equipped with advanced information systems, and develops a general procedure for the stability analysis of the associated dynamic traffic ... Keywords: Dynamical systems, Feedback control, Lyapunov methods, Stability analysis

S. Peeta; T. -H. Yang

2003-01-01T23:59:59.000Z

409

LANL | TT | License | Software - Los Alamos National Lab ...  

An example tool to enable high performance computing researchers to study the performance issues with the checkpoint dump mechanisms used by many high ...

410

License or copyright restrictions may apply to redistribution; see http://www.ams.org/journal-terms-of-use License or copyright restrictions may apply to redistribution; see http://www.ams.org/journal-terms-of-use  

E-Print Network (OSTI)

License or copyright restrictions may apply to redistribution; see http://www.ams.org/journal-terms-of-use #12;License or copyright restrictions may apply to redistribution; see http://www.ams.org/journal-terms-of-use #12;License or copyright restrictions may apply to redistribution; see http://www.ams.org/journal-terms

Flicker, Yuval

411

Proposal to negotiate the renewal of the contract for the licensing and maintenance of database management system software  

E-Print Network (OSTI)

Proposal to negotiate the renewal of the contract for the licensing and maintenance of database management system software

2008-01-01T23:59:59.000Z

412

L This Issue:  

Science Conference Proceedings (OSTI)

... or simpler operations such as checking auto- mobile engine ... the relatively small quantity of hydro- carbon undergoing ... of motion must be car- ried out ...

2010-04-08T23:59:59.000Z

413

UPDATE TO THE YUCCA MOUNTAIN REPOSITORY LICENSE APPLICATION  

E-Print Network (OSTI)

The purpose of this letter is to transmit the U.S. Department of Energy's (DOE) first update to the Yucca Mountain Repository LA, which meets the requirements of 10 CFR 63.22(c) to update the application on notification of the appointment of an Atomic Safety and Licensing Board. DOE initially transmitted its LA for construction authorization to the U.S. Nuclear Regulatory Commission (NRC) on June 3, 2008. In accordance with 10 CFR 63.22(e), DOE certifies that this revision reflects the updated LA as of October 16, 2008. Changes made to this revision were determined not to be significant and did not impact the conclusions of the LA. The update was initiated soon after the docketing of the LA by the NRC in anticipation of notification of the appointment of an Atomic Safety and Licensing Board. Due to the lengthy process required to maintain configuration control between the paper version and the electronic version, and the time required to print the paper version, DOE is submitting the update prepared as of that time. Enclosed are optical storage media which contain: 1) the first update of the LA, with revised sections clearly identified as Revision 1, and text and figure changes noted with marginal change bars; and 2) updates to the primary reference documents to the LA, affecting 36 of the original 196 references. In addition, enclosed in paper format are: 1) a detailed listing of the contents of the optical storage media submitted with this letter; 2) a summary of the specific LA changes that have been made, including the sections revised and a description of each change; and 3) copies of the individual LA pages affected by changes since the June 3, 2008, submittal. The updates to the primary reference

Michael F. Weber

2009-01-01T23:59:59.000Z

414

Accelerating News Issue 5  

E-Print Network (OSTI)

In this spring issue, we look at developments towards higher luminosity and higher energy colliders. We report on the technology developed for the remote powering of the LHC magnets and studies of diagnostics based on higher order mode port signals. We also inform you about the main outcome of the TIARA survey on market needs for accelerator scientists.

Szeberenyi, A

2013-01-01T23:59:59.000Z

415

In this issue  

SciTech Connect

The following topics are discussed in this issue: (1) review of a decade of research in plasma studies at Cornell, (2) reaching ignition temperature in a controlled thermonuclear reactor, (3) heating toroidal plasmas with electron beams, (4) new sources of very high power, and (5) an ion ring bottle for a fusion reactor. (MOW)

1977-12-01T23:59:59.000Z

416

Reviewing Consensus HFE Standards for NRC Use: A Case Study using the IEEE Standard for Computerized Operating Procedure Systems  

SciTech Connect

The U.S. Nuclear Regulatory Commissions (NRCs) endorsement of consensus standards provides a cost-effective means of enhancing the staffs ability to review state-of-the-art designs. Although the NRC endorsed consensus standards in many technical disciplines, it yet has to do so in human factors engineering (HFE). The purpose of our study was to develop a standardized methodology whereby to evaluate a consensus HFE standard to determine its appropriateness to, and adequacy for using in licensing reviews. The high-level objective of the methodology is to ensure that the guidance meets the NRCs requirements on scientific- and engineering-rigor that they use in developing their own guidance. We propose four criteria for endorsing a consensus standard: (1) It should meet an existing need for NRCs licensing and safety reviews; (2) it should be based on sound HFE principles; (3) it should be thoroughly peer-reviewed; and, (4) it should address human performance issues identified in the literature. Our methodology offers a means to assess these four criteria. We used it to evaluate an Institute of Electrical and Electronics Engineers (IEEE) draft standard on computerized operating procedure systems. We concluded that the IEEE standard generally met the established criteria, although several areas were identified that needed further clarification. Our evaluation methodology particularly was useful for identifying issues to be resolved, and for providing a basis for judging whether the staff should consider endorsing the standard. The methodology also helped recognize criteria in the proposed standard that may benefit from additional scrutiny by the staff. The evaluation methodology developed is applicable generally to reviewing other HFE standards that the NRC is considering for use or endorsement.

OHara, J.M.; Higgins, J.; Xing, J., Fleger S. - NRC

2010-11-07T23:59:59.000Z

417

Operations & Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

418

Diversity Issues Committee - Mission Statement  

NLE Websites -- All DOE Office Websites (Extended Search)

Diversity Issues Committee Mission Statement Investigate and study issues relating to diversity in the SUF workforce. Provide recommendations to SUF management to improve the work...

419

Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 15  

Science Conference Proceedings (OSTI)

This report supplements the Safety Evaluation Report (SER), NUREG-0847 (June 1982), Supplement No. 1 (September 1982), Supplement No. 2 (January 1984), Supplement No. 3 (January 1985), Supplement No. 4 (March 1985), Supplement No. 5 (November 1990), Supplement No. 6 (April 1991), Supplement No. 7 (September 1991), Supplement No. 8 (January 1992), Supplement No. 9 (June 1992), Supplement No. 10 (October 1992), Supplement No. 11 (April 1993), Supplement No. 12 (October 1993), Supplement No. 13 (April 1994), and Supplement No. 14 (December 1994) issued by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission with respect to the application filed by the Tennessee Valley Authority, as applicant and owner, for licenses to operate the Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). The facility is located in Rhea County, Tennessee, near the Watts Bar Dam on the Tennessee River. This supplement provides recent information regarding resolution of some of the outstanding and confirmatory items, and proposed license conditions identified in the SER.

Tam, P.S.

1995-06-01T23:59:59.000Z

420

Fundamental Issues in Subzero PEMFC Startup and Operation  

NLE Websites -- All DOE Office Websites (Extended Search)

associated with phase transition * Water movement under temperature gradients and multiphase transport in porous media under very low temperature conditions * Kinetics of...

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Energy Department Issues Draft Request for Proposals for Operation...  

Office of Science (SC) Website

for Teachers and Scientists Small Business Innovation Research and Small Business Technology Transfer Project Assessment Laboratories Ames Laboratory Argonne National...

422

Slag Furnaces - Some Issues for Optimal Design and Operation  

Science Conference Proceedings (OSTI)

A Review of Pyro, Hydro and Electro-metallurgical Processes for Recovering Valuable ... Hydrodynamic Interactions of Two Micro-bubbles Due to an Ultrasonic...

423

Natural Gas Transportation - Infrastructure Issues and Operational Trends  

Reports and Publications (EIA)

This report examines how well the current national natural gas pipeline network has been able to handle today's market demand for natural gas. In addition, it identifies those areas of the country where pipeline utilization is continuing to grow rapidly and where new pipeline capacity is needed or is planned over the next several years.

Information Center

2001-10-01T23:59:59.000Z

424

Materials Issues Potentially Impacting Long-Term Safe Operations  

Science Conference Proceedings (OSTI)

Abstract Scope, Existing nuclear power plants (NPPs), which were originally designed for ... Atomic-Scale Modeling of the Dislocation - Radiation Obstacle Interactions ... Mechanical Behavior of Ion Irradiated Metals at High Damage Levels.

425

Volume III, Issue 11  

NLE Websites -- All DOE Office Websites (Extended Search)

III, Issue 11 III, Issue 11 November 2013 your connection to Brookhaven Lab's world-class science Maximizing Energy Gains from Tiny Nanoparticles Sometimes big change comes from small begin- nings. That's especially true in the research of Anatoly Frenkel, a professor of phys- ics at Yeshiva University, who is working to reinvent the way we use and produce energy by unlocking the potential of some of the world's tiniest structures - nanoparticles. "The nanoparticle is the smallest unit in most novel materials, and all of its prop- erties are linked in one way or another to its structure," said Frenkel. "If we can un- derstand that connection, we can derive much more infor- mation about how it can be used for catalysis, energy, and other purposes."

426

Sample Changes and Issues  

U.S. Energy Information Administration (EIA) Indexed Site

Sample and Model Issues Sample and Model Issues Summary Our comprehensive review of the EIA 914 has confirmed that discrepancies can arise between estimates for December of one year and January of the next. These are most evident for Texas estimates between December 2008 and January 2009. Reports now available from HPDI show that production for all the companies we sampled in both 2008 and 2009 rose by about 60 million cubic feet per day (MMcf/d) in January and that total production in Texas rose by a similar amount. Our estimate was a decrease of 360 MMcf/d. Why the difference? Computationally, EIA-914 estimates depend on two factors: * Reports from the companies in the survey sample * An expansion factor to estimate total production from the sample's reported

427

Discussion of Process Issues  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Study and Study and Criteria for Designation of National Interest Electric Transmission Corridors March 29, 2006 Discussion of Process Issues David Meyer Office of Electricity Delivery and Energy Reliability US Department of Energy 2 Two Basic, Interdependent Issues Geographic Scope of National Corridors Appropriate Timing for Designation of a National Corridor Interdependent because route becomes more predictable as a proposed project is refined 3 New Term: Electric Transmission Constraint Area "Constraint Area" would refer to a problem in the transmission infrastructure Usually would not have a precise locus or boundaries By designating a Constraint Area, DOE could flag an important problem - and remain agnostic about how to solve it 4 Relationship of Constraint Areas

428

Emerging Protective Relay Issues  

Science Conference Proceedings (OSTI)

The synchrophasor technology gains industrywide interest and momentum. Thousands of phasor measurement units (PMUs) will be deployed in substations across the North American power grid in the next few years. However, the synchrophasor technology and associated industry standards are still under development and evolve every day. Utilities, particularly those that have ongoing synchrophasor projects, are facing various challenges and issues in the practical deployment and application of the technology. The...

2010-12-11T23:59:59.000Z

429

Issue Development sheet Example  

Energy.gov (U.S. Department of Energy (DOE))

ISSUE DEVELOPMENT SHEET INFORMATION ONLY The information provided below indicates that a potential concern for finding has been identified. Please provide any objective evidence you may have that could either alleviate the concern or eliminate the finding. If no objective evidence is available/can be provided by the end of this audit (at the scheduled end of field work), this information will be included in the audit report and reported as a concern or an audit finding as appropriate.

430

Wind energy: legal issues and institutional barriers  

DOE Green Energy (OSTI)

Before the potential of wind energy can be realized, large-scale commercialization will have to occur. Standing in the way of commercial development are various institutional and legal barriers. These include (1) possible conflicts with existing zoning and other land-use planning schemes, (2) the question of guaranteeing access to the wind, (3) possible tort and environmental law issues raised by WECS operation, and (4) the critical problem of creating financial incentives. The implications of each of these issues and solutions where practicable are presented.

Coit, L.

1979-06-01T23:59:59.000Z

431

Licensing topical report: interpretation of general design criteria for high-temperature gas-cooled reactors  

SciTech Connect

This Licensing Topical Report presents a set of General Design Criteria (GDC) which is proposed for applicability to licensing of graphite-moderated, high-temperature gas-cooled reactors (HTGRs). Modifications as necessary to reflect HTGR characteristics and design practices have been made to the GDC derived for applicability to light-water-cooled reactors and presented in Appendix A of Part 50, Title 10, Code of Federal Regulations, including the Introduction, Definitions, and Criteria. It is concluded that the proposed set of GDC affords a better basis for design and licensing of HTGRs.

Orvis, D.D.; Raabe, P.H.

1980-01-01T23:59:59.000Z

432

Annual Operation of Selective Catalytic Reduction Systems  

Science Conference Proceedings (OSTI)

In 2009, many coal-fired generating units equipped with selective catalytic reduction (SCR) systems for nitrogen oxide (NOX) control will convert from seasonal to annual SCR operation. This report provides guidelines on how to prepare for annual operation. It focuses on existing experience with annual operation, catalyst management strategy, equipment reliability, cold weather issues, low load and cycling operation, and risk assessment.

2007-12-18T23:59:59.000Z

433

Model and Analytic Processes for Export License Assessments  

SciTech Connect

This paper represents the Department of Energy Office of Nonproliferation Research and Development (NA-22) Simulations, Algorithms and Modeling (SAM) Program's first effort to identify and frame analytical methods and tools to aid export control professionals in effectively predicting proliferation intent; a complex, multi-step and multi-agency process. The report focuses on analytical modeling methodologies that alone, or combined, may improve the proliferation export control license approval process. It is a follow-up to an earlier paper describing information sources and environments related to international nuclear technology transfer. This report describes the decision criteria used to evaluate modeling techniques and tools to determine which approaches will be investigated during the final 2 years of the project. The report also details the motivation for why new modeling techniques and tools are needed. The analytical modeling methodologies will enable analysts to evaluate the information environment for relevance to detecting proliferation intent, with specific focus on assessing risks associated with transferring dual-use technologies. Dual-use technologies can be used in both weapons and commercial enterprises. A decision-framework was developed to evaluate which of the different analytical modeling methodologies would be most appropriate conditional on the uniqueness of the approach, data availability, laboratory capabilities, relevance to NA-22 and Office of Arms Control and Nonproliferation (NA-24) research needs and the impact if successful. Modeling methodologies were divided into whether they could help micro-level assessments (e.g., help improve individual license assessments) or macro-level assessment. Macro-level assessment focuses on suppliers, technology, consumers, economies, and proliferation context. Macro-level assessment technologies scored higher in the area of uniqueness because less work has been done at the macro level. An approach to developing testable hypotheses for the macro-level assessment methodologies is provided. The outcome of this works suggests that we should develop a Bayes Net for micro-level analysis and continue to focus on Bayes Net, System Dynamics and Economic Input/Output models for assessing macro-level problems. Simultaneously, we need to develop metrics for assessing intent in export control, including the risks and consequences associated with all aspects of export control.

Thompson, Sandra E.; Whitney, Paul D.; Weimar, Mark R.; Wood, Thomas W.; Daly, Don S.; Brothers, Alan J.; Sanfilippo, Antonio P.; Cook, Diane; Holder, Larry

2011-09-29T23:59:59.000Z

434

Issues for reuse of gloveboxes at LANL TA-55  

Science Conference Proceedings (OSTI)

This report is a summary of issues that face plutonium glovebox designers and users at the Los Alamos National Laboratory (LANL) Technical Area 55 (TA-55). Characterizing the issues is a step in the task of enhancing the next generation glovebox design to minimize waste streams while providing the other design functions. This report gives an initial assessment of eight important design and operation issues that can benefit from waste minimization.

Cadwallader, L.C.; Pinson, P.A.; Miller, C.F.

1998-08-01T23:59:59.000Z

435

Enforcement Guidance Supplement 00-03, Specific Issues on Applicabilit...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SUBJECT: Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of 10 CFR 830 Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety...

436

Maintenance simulation: Software issues  

SciTech Connect

The maintenance of a distributed software system in a production environment involves: (1) maintaining software integrity, (2) maintaining and database integrity, (3) adding new features, and (4) adding new systems. These issues will be discussed in general: what they are and how they are handled. This paper will present our experience with a distributed resource management system that accounts for resources consumed, in real-time, on a network of heterogenous computers. The simulated environments to maintain this system will be presented relate to the four maintenance areas.

Luk, C.H.; Jette, M.A.

1995-07-01T23:59:59.000Z

437

Technology transfer issue  

Science Conference Proceedings (OSTI)

Testimony by Lawrence J. Brady, Commerce Assistant Secretary for Trade Administration, at Congressional hearings on the national security issues of technology transfers to the Soviet Union identified steps the US needs to take to deal effectively with the problem. These steps include an understanding of how the Soviet Union has and will benefit militarily by acquiring Western technology and efforts to work with other countries, counterintelligence agencies, and industries to stem the flow of technological information. Brady outlined changes in technology development that complicate the enforcement of transfer rules, and emphasized the importance of a close relationship between the business community and the Commerce Department. (DCK)

Jacobson, C.

1982-05-31T23:59:59.000Z

438

Pricing and licensing of software products and services : a study on industry trends  

E-Print Network (OSTI)

The software product business reached the $150 billion mark at the end of 2005. The pricing and licensing of new products, maintenance services, services and service maintenance have become an important strategy to deliver ...

Nayak, Shivashis

2006-01-01T23:59:59.000Z

439

Sci Protek Signs Licensing Deal for Technology that Reduces Plant Disease |  

NLE Websites -- All DOE Office Websites (Extended Search)

Sci Protek Signs Licensing Deal for Technology that Reduces Plant Disease Sci Protek Signs Licensing Deal for Technology that Reduces Plant Disease January 06, 2011 A California based small business, Sci Proteck, Inc, has recently licensed technology developed at the Department of Energy's Oak Ridge National Laboratory (ORNL) and the University of Chicago (UChicago) to protect plants from crop diseases. Research on this new method for inducing plant pathogen resistance began in 2005 following a grant from the National Science Foundation and research support from the Office of Biological and Environmental Research of the U.S. Department of Energy. Principal developers include Timothy Tschaplinski at ORNL and Drs. Jean Greenberg and Ho Won Jung at the UChicago. ORNL and UChicago entered into an Inter-Institutional Agreement for licensing, patent prosecution, and royalty sharing.

440

Figure 72. Vehicle miles traveled per licensed driver, 1970-2040 ...  

U.S. Energy Information Administration (EIA)

Sheet3 Sheet2 Sheet1 Figure 72. Vehicle miles traveled per licensed driver, 1970-2040 (thousand miles) History Reference case 1970.00 $8.69 1971.00 $9.01

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

NSNFP Activities in Support of Repository Licensing for Disposal of DOE SNF  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy (DOE) Office of Civilian Radioactive Waste Management is in the process of preparing the Yucca Mountain license application for submission to the Nuclear Regulatory Commission as the nations first geologic repository for spent nuclear fuel (SNF) and high-level waste. Because the DOE SNF will be part of the license application, there are various components of the license application that will require information relative to the DOE SNF. The National Spent Nuclear Fuel Program (NSNFP) is the organization that directs the research, development, and testing of treatment, shipment, and disposal technologies for all DOE SNF. This report documents the work activities conducted by the NSNFP and discusses the relationship between these NSNFP technical activities and the license application. A number of the NSNFP activities were performed to provide risk insights and understanding of DOE SNF disposal as well as to prepare for anticipated questions from the regulatory agency.

Henry H. Loo; Brett W.. Carlsen; Sheryl L. Morton; Larry L. Taylor; Gregg W. Wachs

2004-09-01T23:59:59.000Z

442

EFRT M-12 Issue Resolution: Solids Washing  

SciTech Connect

Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, Undemonstrated Leaching Processes of the External Flowsheet Review Team (EFRT) issue response plan.( ) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.

Baldwin, David L.; Schonewill, Philip P.; Toth, James J.; Huckaby, James L.; Eslinger, Paul W.; Hanson, Brady D.; Kurath, Dean E.; Minette, Michael J.

2010-01-01T23:59:59.000Z

443

Sodium fast reactor safety and licensing research plan. Volume II.  

SciTech Connect

Expert panels comprised of subject matter experts identified at the U.S. National Laboratories (SNL, ANL, INL, ORNL, LBL, and BNL), universities (University of Wisconsin and Ohio State University), international agencies (IRSN, CEA, JAEA, KAERI, and JRC-IE) and private consultation companies (Radiation Effects Consulting) were assembled to perform a gap analysis for sodium fast reactor licensing. Expert-opinion elicitation was performed to qualitatively assess the current state of sodium fast reactor technologies. Five independent gap analyses were performed resulting in the following topical reports: (1) Accident Initiators and Sequences (i.e., Initiators/Sequences Technology Gap Analysis), (2) Sodium Technology Phenomena (i.e., Advanced Burner Reactor Sodium Technology Gap Analysis), (3) Fuels and Materials (i.e., Sodium Fast Reactor Fuels and Materials: Research Needs), (4) Source Term Characterization (i.e., Advanced Sodium Fast Reactor Accident Source Terms: Research Needs), and (5) Computer Codes and Models (i.e., Sodium Fast Reactor Gaps Analysis of Computer Codes and Models for Accident Analysis and Reactor Safety). Volume II of the Sodium Research Plan consolidates the five gap analysis reports produced by each expert panel, wherein the importance of the identified phenomena and necessities of further experimental research and code development were addressed. The findings from these five reports comprised the basis for the analysis in Sodium Fast Reactor Research Plan Volume I.

Ludewig, H. (Brokhaven National Laboratory, Upton, NY); Powers, D. A.; Hewson, John C.; LaChance, Jeffrey L.; Wright, A. (Argonne National Laboratory, Argonne, IL); Phillips, J.; Zeyen, R. (Institute for Energy Petten, Saint-Paul-lez-Durance, France); Clement, B. (IRSN/DPAM.SEMIC Bt 702, Saint-Paul-lez-Durance, France); Garner, Frank (Radiation Effects Consulting, Richland, WA); Walters, Leon (Advanced Reactor Concepts, Los Alamos, NM); Wright, Steve; Ott, Larry J. (Oak Ridge National Laboratory, Oak Ridge, TN); Suo-Anttila, Ahti Jorma; Denning, Richard (Ohio State University, Columbus, OH); Ohshima, Hiroyuki (Japan Atomic Energy Agency, Ibaraki, Japan); Ohno, S. (Japan Atomic Energy Agency, Ibaraki, Japan); Miyhara, S. (Japan Atomic Energy Agency, Ibaraki, Japan); Yacout, Abdellatif (Argonne National Laboratory, Argonne, IL); Farmer, M. (Argonne National Laboratory, Argonne, IL); Wade, D. (Argonne National Laboratory, Argonne, IL); Grandy, C. (Argonne National Laboratory, Argonne, IL); Schmidt, R.; Cahalen, J. (Argonne National Laboratory, Argonne, IL); Olivier, Tara Jean; Budnitz, R. (Lawrence Berkeley National Laboratory, Berkeley, CA); Tobita, Yoshiharu (Japan Atomic Energy Agency, Ibaraki, Japan); Serre, Frederic (Centre d'%C3%94etudes nucl%C3%94eaires de Cadarache, Cea, France); Natesan, Ken (Argonne National Laboratory, Argonne, IL); Carbajo, Juan J. (Oak Ridge National Laboratory, Oak Ridge, TN); Jeong, Hae-Yong (Korea Atomic Energy Research Institute, Daejeon, Korea); Wigeland, Roald (Idaho National Laboratory, Idaho Falls, ID); Corradini, Michael (University of Wisconsin-Madison, Madison, WI); Thomas, Justin (Argonne National Laboratory, Argonne, IL); Wei, Tom (Argonne National Laboratory, Argonne, IL); Sofu, Tanju (Argonne National Laboratory, Argonne, IL); Flanagan, George F. (Oak Ridge National Laboratory, Oak Ridge, TN); Bari, R. (Brokhaven National Laboratory, Upton, NY); Porter D. (Idaho National Laboratory, Idaho Falls, ID); Lambert, J. (Argonne National Laboratory, Argonne, IL); Hayes, S. (Idaho National Laboratory, Idaho Falls, ID); Sackett, J. (Idaho National Laboratory, Idaho Falls, ID); Denman, Matthew R.

2012-05-01T23:59:59.000Z

444

Proceedings: Decommissioning--License Termination Plans and Final Site Release Workshop  

SciTech Connect

This report presents the proceedings of an EPRI workshop dealing with the subject of decommissioning license termination and final site release. The workshop was the ninth in a series designed to aid utility personnel in assessing technologies for decommissioning nuclear power plants. It focused on specific aspects of license termination activities and final site release as they relate to nuclear plant decommissioning. The information presented will help utilities control decommissioning costs by selecting the best practices and technologies

None

2004-03-01T23:59:59.000Z

445

Guide to Assessing Radiological Elements for License Termination of Nuclear Power Plants  

Science Conference Proceedings (OSTI)

This report provides guidance in the preparation of a License Termination Plan (LTP) to utilities engaged in nuclear plant decommissioning. The U.S. Nuclear Regulatory Commission (NRC) requires utilities to submit the LTP document years prior to the site license termination. This report focuses on the radiological components of the LTP. It identifies and addresses the regulatory requirements of each element in a way useful to the utility end user.

2002-06-12T23:59:59.000Z

446

Proceedings: Decommissioning--License Termination Plans and Final Site Release Workshop  

Science Conference Proceedings (OSTI)

This report presents the proceedings of an EPRI workshop dealing with the subject of decommissioning license termination and final site release. The workshop was the ninth in a series designed to aid utility personnel in assessing technologies for decommissioning nuclear power plants. It focused on specific aspects of license termination activities and final site release as they relate to nuclear plant decommissioning. The information presented will help utilities control decommissioning costs by selecti...

2004-04-13T23:59:59.000Z

447

Decommissioning: License Termination and Final Site Release: Proceedings of EPRI Technical Workshop, October 2001  

Science Conference Proceedings (OSTI)

This report presents the proceedings of an EPRI workshop on decommissioning license termination and final site release. The workshop was the eighth in a series designed to aid utility personnel in assessing technologies for decommissioning nuclear power plants. This workshop focused on specific aspects of license termination and final site release as they relate to nuclear plant decommissioning. The information presented will help utilities control decommissioning costs by selecting the best practices an...

2002-02-08T23:59:59.000Z

448

Environmental issues in China  

Science Conference Proceedings (OSTI)

Global concern about the environment is increasing, and the People's Republic of China (PRC) is not immune from such concerns. The Chinese face issues similar to those of many other developing nations. The US Department of Energy is particularly interested in national and world pollution issues, especially those that may infringe on other countries' economic growth and development. The DOE is also interested in any opportunities that might exist for US technical assistance and equipment in combating environmental problems. Our studies of articles in the China Daily, and English-language daily newspaper published by the Chinese government, show that population, pollution, and energy are major concerns of the Chinese Communist Party. Thus this report emphasizes the official Chinese government view. Supporting data were also obtained from other sources. Regardless of the severity of their various environmental problems, the Chinese will only try to remedy those problems with the greatest negative effects on its developing economy. They will be looking for foreign assistance, financial and informational, to help implement solutions. With the Chinese government seeking assistance, the United States has an opportunity to export basic technical information, especially in the areas of pollution control and monitoring, oil exploration methods, oil drilling technology, water and sewage treatment procedures, hazardous waste and nuclear waste handling techniques, and nuclear power plant safety procedures. In those areas the US has expertise and extensive technical experience, and by exporting the technologies the US would benefit both economically and politically. 59 refs., 3 figs.

Travis, P.S.

1991-10-01T23:59:59.000Z

449

Reformulated gasoline quality issues  

Science Conference Proceedings (OSTI)

One year ago, a panel of industry experts were interviewed in the November/December 1994 issue of Fuel Reformulation (Vol. 4, No. 6). With the focus then and now on refinery investments, the panelists were asked to forecast which refining processes would grow in importance. It is apparent from their response, and from other articles and discussions throughout the year, that hydroprocessing and catalytic conversion processes are synergistic in the overall refinery design, with flexibility and process objectives varying on a unit-by-unit case. To an extent, future refinery investments in downstream petrochemicals, such as for paraxylene production, are based on available catalytic reforming feedstock. Just a importantly, hydroprocessing units (hydrotreating, hydrocracking) needed for clean fuel production (gasoline, diesel, aviation fuel), are heavily dependent on hydrogen production from the catalytic reformer. Catalytic reforming`s significant influence in the refinery hydrogen balance, as well as its status as a significant naphtha conversion route to higher-quality fuels, make this unit a high-priority issue for engineers and planners striving for flexibility.

Gonzalez, R.G.; Felch, D.E.; Edgar, M.D.

1995-11-01T23:59:59.000Z

450

Decontamination, decommissioning, and vendor advertorial issue, 2008  

SciTech Connect

The focus of the July-August issue is on Decontamination, decommissioning, and vendor advertorials. Articles and reports in this issue include: D and D technical paper summaries; The role of nuclear power in turbulent times, by Tom Chrisopher, AREVA, NP, Inc.; Enthusiastic about new technologies, by Jack Fuller, GE Hitachi Nuclear Energy; It's important to be good citizens, by Steve Rus, Black and Veatch Corporation; Creating Jobs in the U.S., by Guy E. Chardon, ALSTOM Power; and, and, An enviroment and a community champion, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovations article is titled Best of the best TIP achievement 2008, by Edward Conaway, STP Nuclear Operating Company.

Agnihotri, Newal (ed.)

2008-07-15T23:59:59.000Z

451

Department of Energy interest and involvement in nuclear plant license renewal activities  

SciTech Connect

Recognizing the importance of nuclear license renewal to the nation's energy strategy, the Department of Energy (DOE) initiated a plant lifetime improvement program during 1985 to determine the feasibility of the license renewal option for US nuclear plants. Initial activities of the DOE program focused on determining whether there were technical and economic obstacles that might preclude or limit the successful implementation of the license renewal option. To make this determination, DOE cosponsored with the Electric Power Research Institute (EPRI) pilot-plant efforts by Virginia Electric Power and Northern States Power. Both pilot-plant efforts concluded that life extension is technically and economically feasible. In parallel with the pilot-plant activities, DOE performed national economic studies that demonstrated the economic desirability of life extension. Having demonstrated the feasibility of life extension, DOE, in conjunction with EPRI, selected two lead plants to demonstrate the license renewal process. These lead plants are Yankee Atomic's Yankee Rowe facility and Northern States Power's Monticello facility. DOE also initiated activities to develop the technical and regulatory bases to support the license renewal process in the United States. DOE has recently identified nuclear plant license renewal to be an important element of its National Energy Strategy. This paper summarizes the significant results, conclusions, and ongoing activities of the DOE effort. 18 refs.

Bustard, L.D. (Sandia National Labs., Albuquerque, NM (USA)); Harrison, D.L. (USDOE Assistant Secretary for Nuclear Energy, Washington, DC (USA). Office of LWR Safety and Technology)

1991-01-01T23:59:59.000Z

452

Project licensing plan for UMTRA (Uranium Mill Tailings Remedial Action) sites  

SciTech Connect

The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process ( Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs.

Not Available

1984-07-01T23:59:59.000Z

453

OPERATIONS (OPS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPS) OPS) OBJECTIVE OPS.1 The formality and discipline of operations is adequate to conduct work safely and programs are in place to maintain this formality and discipline. (CR 13) Scope: The Conduct of Operations Program was evaluated during the recent KE Basin FTS ORR and was found to be adequately implemented. Based on this result and the subsequent program enhancements, the scope of the review is to be limited to the SWS operating and maintenance evolutions. Criteria * Programmatic elements of conduct of operations are in place for SWS operations. (DOE Order 5480.19) * The SWS operations personnel adequately demonstrate the principles of conduct of operations requirements during the shift performance period. (DOE Order 5480.19)

454

In this issue:  

E-Print Network (OSTI)

The economics of nuclear energy Decommissioning policies, strategies and costs: an international overview Improving the interface between nuclear regulators and operators A new profile for regulators in radioactive waste management Stepwise decision making for the long-term management of radioactive waste Nuclear emergency management: whats new? Recurring events: a nuclear safety concern

French The Oecd Nuclear

2003-01-01T23:59:59.000Z

455

EIA - AEO2010 - Issues in Focus  

Gasoline and Diesel Fuel Update (EIA)

Issues in Focus Issues in Focus Annual Energy Outlook 2010 with Projections to 2035 Issues in Focus Introduction Each year, the Issues in Focus section of the AEO provides an in-depth discussion on topics of special interest, including significant changes in assumptions and recent developments in technologies for energy production, supply, and consumption. The first section compares the results of two cases that adopt different assumptions about the future course of existing energy policies. One case assumes the elimination of sunset provisions in existing energy policies. The other case assumes the extension of a selected group of existing policies—CAFE standards, appliance standards, and PTCs—in addition to the elimination of sunset provisions. Other sections include a discussion of end-use energy efficiency trends in AEO2010; an analysis of the impact of incentives on the use of natural gas in heavy freight trucks; factors affecting the relationship between crude oil and natural gas prices; the sensitivity of the projection results to variations in assumptions about the availability of U.S. shale gas resources; the implications of retiring nuclear plants after 60 years of operation; and issues related to accounting for CO2 emissions from biomass energy combustion.

456

SAFARI 2000 Special Issue  

NLE Websites -- All DOE Office Websites (Extended Search)

INTERNATIONAL JOURNAL OF REMOTE SENSING 26 (19) INTERNATIONAL JOURNAL OF REMOTE SENSING 26 (19) OCTOBER 10, 2005 Privette JL, Roy DP. Southern Africa as a remote sensing test bed: the SAFARI 2000 Special Issue overview. INTERNATIONAL JOURNAL OF REMOTE SENSING 26 (19): 4141-4158. Eckardt FD, Kuring N. SeaWiFS identifies dust sources in the Namib Desert. INTERNATIONAL JOURNAL OF REMOTE SENSING 26 (19): 4159-4167. Hao WM, Ward DE, Susott RA, et al. Comparison of aerosol optical thickness measurements by MODIS, AERONET sun photometers, and Forest Service handheld sun photometers in southern Africa during the SAFARI 2000 campaign. INTERNATIONAL JOURNAL OF REMOTE SENSING 26 (19): 4169-4183. Sa ACL, Pereira JMC, Silva JMN. Estimation of combustion completeness based on fire-induced spectral reflectance changes in a dambo grassland (Western Province, Zambia).

457

NIST Testimony on Computer Issues  

Science Conference Proceedings (OSTI)

NIST Testimony on Computer Issues. 2010. Cita Furlani House Oversight Testimony Cloud Computing, July 1, 2010 Cloud ...

2010-10-05T23:59:59.000Z

458

NIST Testimony on Earthquake Issues  

Science Conference Proceedings (OSTI)

NIST Testimony on Earthquake Issues. 2009. The Reauthorization of the National Earthquake Hazards Program: R&D for ...

2010-10-05T23:59:59.000Z

459

Mr. William f. Crow, Acting Director . Uranium Fuel Licensing...  

Office of Legacy Management (LM)

to conduct remedial action under FUSRAP, derived from the Atomic Energy Act of 1954, as amended, is limited to those sites operated prior to the establishment of AEC...

460

Support for Licensing of Nuclear Power Plants and Fuel Cycle...  

NLE Websites -- All DOE Office Websites (Extended Search)

have been reviewing applications for the construction and operation of new reactors and uranium enrichment facilities. Since 2007, after a hiatus of approximately 30 years, the...

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

LANL | TT | License | Software - Los Alamos National Lab: National ...  

Los Alamos National Laboratory Est 1943 . Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA

462

Heat pipe technology issues  

SciTech Connect

Critical high temperature, high power applications in space nuclear power designs are near the current state of the art of heat pipe technology in terms of power density, operating temperature, and lifetime. Recent heat pipe development work at Los Alamos National Laboratory has involved performance testing of typical space reactor heat pipe designs to power levels in excess of 19 kW/cm/sup 2/ axially and 300 W/cm/sup 2/ radially at temperatures in the 1400 to 1500 K range. Operation at conditions in the 10 kW/cm/sup 2/ range has been sustained for periods of up to 1000 hours without evidence of performance degradation. The effective length for heat transport in these heat pipes was from 1.0 to 1.5 M. Materials used were molybdenum alloys with lithium employed as the heat pipe operating fluid. Shorter, somewhat lower power, molybdenum heat pipes have been life tested at Los Alamos for periods of greater than 25,000 hours at 1700 K with lithium and 20,000 hours at 1500/sup 0/K with sodium. These life test demonstrations and the attendant performance limit investigations provide an experimental basis for heat pipe application in space reactor design and represent the current state-of-the-art of high temperature heat pipe technology.

Merrigan, M.A.

1984-04-01T23:59:59.000Z

463

Government Operation  

Science Conference Proceedings (OSTI)

Use Cases from NBD(NIST Big Data) Requirements WG V1.0. http://bigdatawg. nist.gov/home.php. Contents. Blank Template. Government Operation ...

2013-09-07T23:59:59.000Z

464

Operations Research  

E-Print Network (OSTI)

Mar 1, 2005 ... Operations Research. Report 2005-01. On a closedness theorem. Mikls Ujvri. Marc 2005. Etvs Lornd University of Sciences. Department...

465

Operating Instructions  

Science Conference Proceedings (OSTI)

... The system operation is center around 3 areas of the equipment 1) Deposition chamber 2) Vaporizer 3) Chiller/cold finger ...

2013-01-18T23:59:59.000Z

466

DOE Issues Draft Request for Proposals Seeking Contractor to Manage,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Draft Request for Proposals Seeking Contractor to DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant April 1, 2011 - 12:00pm Addthis Media Contact Bill Taylor 513-246-0539 william.taylor@emcbc.doe.gov Cincinnati - The U.S. Department of Energy (DOE) issued a Draft Request for Proposal (RFP)seeking a management and operations contractor to maintain the Waste Isolation Pilot Plan (WIPP) and manage the DOE National Transuranic Waste (TRU) Program in Carlsbad, New Mexico. The estimated value of the anticipated contract is from $130 to $160 million per year, for five years, with an option to extend the contract for an additional five years. DOE anticipates awarding a competitive, cost-plusaward-fee

467

Part 70 License NRC Docket No. 70-07018 Subject: References: SUPPLEMENT TO APPLICATION FOR A SPECIAL NUCLEAR MATERIAL LICENSE FOR WATTS BAR NUCLEAR PLANT UNIT 2 IN ACCORDANCE  

E-Print Network (OSTI)

(TAC NO. ME0853)" As part of TVA's application for a Special Nuclear Material (SNM) License for Watts Bar Unit 2

Watts Bar; Nuclear Plant; Watts Bar; Nuclear Plant

2009-01-01T23:59:59.000Z

468

Operations research  

Science Conference Proceedings (OSTI)

In Evita, Andrew Lloyd Webber and Tim Rice wrote: Politics, the Art of the Possible. To those of us in the operations research community, we postulate: Operations Research, the Science of Better - (i.e. better processes, better systems and better decisions). ...

William P. Pierskalla

2009-01-01T23:59:59.000Z

469

Operation crosscheck  

SciTech Connect

This report consists of three sections covering the three major areas of Lawrence Livermore Laboratory`s participation in Operation Crosscheck. These areas are: Diagnostic Aircraft; Radiochemical Sampling; and Device Assembly and Handling, Barbers Point. The information contained in these sections has been extracted from Crosscheck post-operation reports.

Gilbert, F. C.

1964-11-06T23:59:59.000Z

470

ITP Materials Compatibility Issues  

SciTech Connect

Based on information provided by ITP, normal operation will consist of controlled exposure to benzene and TBP concentrations of 300 and 100 ppm, respectively, in an approximate 5M NaOH solution at temperatures as high as 50 degrees C. Other compounds present in the filtrate solution were much lower in concentration and were not tested. In addition, levels as high as 1000 ppm benzene or TBP may be reached. It is assumed that the TBP will be maintained at a constant concentration to control foaming behavior.

Skidmore, T.E. [Westinghouse Savannah River Company, AIKEN, SC (United States)

1998-09-01T23:59:59.000Z

471

Laser Propulsion Standardization Issues  

SciTech Connect

It is a relevant issue in the research on laser propulsion that experimental results are treated seriously and that meaningful scientific comparison is possible between groups using different equipment and measurement techniques. However, critical aspects of experimental measurements are sparsely addressed in the literature. In addition, few studies so far have the benefit of independent confirmation by other laser propulsion groups. In this paper, we recommend several approaches towards standardization of published laser propulsion experiments. Such standards are particularly important for the measurement of laser ablation pulse energy, laser spot area, imparted impulse or thrust, and mass removal during ablation. Related examples are presented from experiences of an actual scientific cooperation between NU and DLR. On the basis of a given standardization, researchers may better understand and contribute their findings more clearly in the future, and compare those findings confidently with those already published in the laser propulsion literature. Relevant ISO standards are analyzed, and revised formats are recommended for application to laser propulsion studies.

Scharring, Stefan; Eckel, Hans-Albert [Institute of Technical Physics, German Aerospace Center (DLR), D-70569 Stuttgart, Pfaffenwaldring 38-40 (Germany); Roeser, Hans-Peter [Institute of Space Systems, University of Stuttgart, D-70569 Stuttgart, Pfaffenwaldring 31 (Germany); Sinko, John E. [Micro-Nano Global Center of Excellence, Nagoya University (Niue), Nagoya, Aichi, 464-8603 (Japan); Sasoh, Akihiro [Department of Aerospace Engineering, Nagoya University, Nagoya, Aichi, 464-8603 (Japan)

2010-10-08T23:59:59.000Z

472

Radioactive waste storage issues  

SciTech Connect

In the United States we generate greater than 500 million tons of toxic waste per year which pose a threat to human health and the environment. Some of the most toxic of these wastes are those that are radioactively contaminated. This thesis explores the need for permanent disposal facilities to isolate radioactive waste materials that are being stored temporarily, and therefore potentially unsafely, at generating facilities. Because of current controversies involving the interstate transfer of toxic waste, more states are restricting the flow of wastes into - their borders with the resultant outcome of requiring the management (storage and disposal) of wastes generated solely within a state`s boundary to remain there. The purpose of this project is to study nuclear waste storage issues and public perceptions of this important matter. Temporary storage at generating facilities is a cause for safety concerns and underscores, the need for the opening of permanent disposal sites. Political controversies and public concern are forcing states to look within their own borders to find solutions to this difficult problem. Permanent disposal or retrievable storage for radioactive waste may become a necessity in the near future in Colorado. Suitable areas that could support - a nuclear storage/disposal site need to be explored to make certain the health, safety and environment of our citizens now, and that of future generations, will be protected.

Kunz, D.E.

1994-08-15T23:59:59.000Z

473

Operation Terminology  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Conservation Magnets require a large amount of power to control a particle beam. In order to conserve energy and money when a beam line is down, Operations will install a...

474

Understanding aging issues in Indonesia.  

E-Print Network (OSTI)

??This study used combined methods of observations, interviews and document analysis to understand issues related to aging in Indonesia. The study describes relevant policy and (more)

Napsiyah, Siti.

2005-01-01T23:59:59.000Z

475

EDITORIAL HPJ SPECIAL ISSUE DEDICATION  

Science Conference Proceedings (OSTI)

This issue is dedicated to the heroes and professionals who helped protect the world from nuclear disasters and to those who were displaced by these catastrophes.

Farfan, E.

2011-10-01T23:59:59.000Z

476

PNNL: Breakthroughs Magazine - Past issues  

NLE Websites -- All DOE Office Websites (Extended Search)

enjoy Breakthroughs archived issues featuring science and technology conducted at PNNL. Breakthroughs Spring 2007 cover Spring 2007 Scientific Discovery Flash Version | HTML...

477

APS Diversity Issues Committee Members  

NLE Websites -- All DOE Office Websites (Extended Search)

SUF Diversity Issues Committee Members 2006 - 2008 Daniela Capatina (AES) Frederick Carter (AES) Diego Casa (XSD) Kathy Harkay, Chair (ASD) Quentin Hasse (IPNS) Jyotsana Lal (IPNS)...

478

Lithium-Ion Battery Issues  

NLE Websites -- All DOE Office Websites (Extended Search)

Lithium-Ion Battery Issues IEA Workshop on Battery Recycling Hoboken, Belgium September 26-27, 2011 Linda Gaines Center for Transportation Research Argonne National Laboratory...

479

FEMP Focus: Summer 2004 Issue  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Postal Service (USPS) issued a delivery order under their Northern California Shared Energy Savings (SES) contract to Chevron Energy Solutions for comprehensive energy...

480

Smart-Grid Security Issues  

Science Conference Proceedings (OSTI)

TITLE: Smart-Grid Security Issues (Editorial Material, English) IEEE SECURITY & PRIVACY 8 (1). JAN-FEB 2010. p.81-85 IEEE COMPUTER SOC, LOS ALAMITOS

Khurana, Himanshu; Hadley, Mark D.; Lu, Ning; Frincke, Deborah A.

2010-01-29T23:59:59.000Z

Note: This page contains sample records for the topic "operating licenses issued" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

New Licensing Agreement Opens Energy Patents to NGOs, Non-Profits |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Licensing Agreement Opens Energy Patents to NGOs, Non-Profits Licensing Agreement Opens Energy Patents to NGOs, Non-Profits New Licensing Agreement Opens Energy Patents to NGOs, Non-Profits February 17, 2012 - 11:20am Addthis To reduce the amount of firewood Darfur refugees need, Berkeley Lab scientist Ashok Gadgil and colleagues modified an existing cookstove design to create one that is 75 percent more energy-efficient than the three-stone stove traditionally used in Darfur, and is appropriate to the environmental conditions and food preferences of the local inhabitants. | Photo courtesy of Lawrence Berkeley National Laboratory. To reduce the amount of firewood Darfur refugees need, Berkeley Lab scientist Ashok Gadgil and colleagues modified an existing cookstove design to create one that is 75 percent more energy-efficient than the three-stone

482

Realities of Chiller Plant Operation: Utility Impacts on Owner Operating  

NLE Websites -- All DOE Office Websites (Extended Search)

Realities of Chiller Plant Operation: Utility Impacts on Owner Operating Realities of Chiller Plant Operation: Utility Impacts on Owner Operating Costs and Societal Environmental Issues Speaker(s): Don Aumann Date: March 21, 2000 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Satkartar K. Kinney Don Aumann, a Senior Consultant from BKi in Oakland, will present an overview of two projects he completed for the electric utility industry. The first, a case study evaluation of a hybrid chiller plant in Jefferson City, Missouri, demonstrates the importance of carefully evaluating the impact of utility rate structures on plant operating costs. The building owner, another engineering consultant, and the local utility representatives were confused by the rates and missed an opportunity to cut chiller-plant operating costs by about 20%, totaling $15,000 per year. In

483

BARRIER ISSUES TO THE UTILIZATION OF BIOMASS  

DOE Green Energy (OSTI)

In summary, stoker-fired boilers that cofire or switch to biomass fuel may potentially have to deal with ash behavior issues such as production of different concentrations and quantities of fine particulate or aerosols and ash-fouling deposition. Stoker boiler operators that are considering switching to biomass and adding potential infrastructure to accommodate the switch may also at the same time be looking into upgrades that will allow for generating additional power for sale on the grid. This is the case for the feasibility study being done currently for a small (<1-MW) stoker facility at the North Dakota State Penitentiary, which is considering not only the incorporation of a lower-cost biomass fuel but also a refurbishing of the stoker boiler to burn slightly hotter with the ability to generate more power and sell excess energy on the grid. These types of fuel and boiler changes can greatly affect ash behavior issues.

Greg F. Weber; Christopher J. Zygarlicke

2001-05-01T23:59:59.000Z

484

BARRIER ISSUES TO THE UTILIZATION OF BIOMASS  

Science Conference Proceedings (OSTI)

In summary, stoker-fired boilers that cofire or switch to biomass fuel may potentially have to deal with ash behavior issues such as production of different concentrations and quantities of fine particulate or aerosols and ash-fouling deposition. Stoker boiler operators that are considering switching to biomass and adding potential infrastructure to accommodate the switch may also at the same time be looking into upgrades that will allow for generating additional power for sale on the grid. This is the case for the feasibility study being done currently for a small (boiler to burn slightly hotter with the ability to generate more power and sell excess energy on the grid. These types of fuel and boiler changes can greatly affect ash behavior issues.

Greg F. Weber; Christopher J. Zygarlicke

2001-05-01T23:59:59.000Z

485

Licensing Assistance team U.S. Nuclear Regulatory Commission, Region 1  

E-Print Network (OSTI)

Division of Nuclear Materials Safety 09 / z-4 (p7- 317,7p-4) The enclosed application for Material License and one copy is being submitted for the purpose of obtaining a specific license from the United States Nuclear Regulatory Commission to obtain two cross belt analyzers. The analyzers would be utilized at the Appalachian Power Companys John E. Amos Plant in West Virginia. The Appalachian Power Company and the John E. Amos Plant are included in American Electric Power. If I can be of any further assistance please give me a call at my office telephone number

John E. Amos Plant; R. T. Carroll F; Cc Greg; Massey John; E. Amos Plant; Joe Beer; Corporate Radiation; Safety Officer Donald; C. Cook Plant

2007-01-01T23:59:59.000Z

486

CTBT technical issues handbook  

Science Conference Proceedings (OSTI)

The purpose of this handbook is to give the nonspecialist in nuclear explosion physics and nuclear test monitoring an introduction to the topic as it pertains to a Comprehensive Test Ban Treaty (CTBT). The authors have tried to make the handbook visually oriented, with figures paired to short discussions. As such, the handbook may be read straight through or in sections. The handbook covers four main areas and ends with a glossary, which includes both scientific terms and acronyms likely to be encountered during CTBT negotiations. The following topics are covered: (1) Physics of nuclear explosion experiments. This is a description of basic nuclear physics and elementary nuclear weapon design. Also discussed are testing practices. (2) Other nuclear experiments. This section discusses experiments that produce small amounts of nuclear energy but differ from explosion experiments discussed in the first chapter. This includes the type of activities, such as laser fusion, that would continue after a CTBT is in force. (3) Monitoring tests in various environments. This section describes the different physical environments in which a test could be conducted (underground, in the atmosphere, in space, underwater, and in the laboratory); the sources of non-nuclear events (such as earthquakes and mining operations); and the opportunities for evasion. (4) On-site inspections. A CTBT is likely to include these inspections as an element of the verification provisions, in order to resolve the nature of ambiguous events. This chapter describes some technical considerations and technologies that are likely to be useful. (5) Selecting verification measures. This chapter discusses the uncertain nature of the evidence from monitoring systems and how compliance judgments could be made, taking the uncertainties into account. It also discusses how to allocate monitoring resources, given the likelihood of testing by various countries in various environments.

Zucca, J.J. [ed.

1994-05-01T23:59:59.000Z

487

SSA Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Area Operations (SSA-Ops) Area Operations (SSA-Ops) "BOREAS Ops" was located at the Snodrifters Lodge, in Candle Lake, Saskatchewan. Radiosonde balloon launch at Ops The NASA Helicopter lands at Ops A meeting at the Snodrifter's Lodge Release of a radiosonde at the SSA operations center in Candle Lake. Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help | User Services - Tel: +1 (865) 241-3952 or E-mail: uso@daac.ornl.gov

488

BOREAS Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Study Area Operations/Thompson Airport (NSA-Ops) Study Area Operations/Thompson Airport (NSA-Ops) NSA Operations (NSA-Ops) The Keewatin Air Hanger: site of BOREAS Ops 1994 Dr. Piers Sellers working in Ops, 1994 BOREAS "Air Force" The NASA C-130 The University of Wyoming King Air The NASA Helicopter The NRC Twin Otter The NCAR Electra The Ontario Chieftain Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help |

489

DOE Issues Request for Quotations for Depleted Uranium Hexafluoride  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issues Request for Quotations for Depleted Uranium Hexafluoride Issues Request for Quotations for Depleted Uranium Hexafluoride Conversion Technical Services DOE Issues Request for Quotations for Depleted Uranium Hexafluoride Conversion Technical Services December 12, 2012 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today issued a Request for Quotation (RFQ) for engineering and operations technical services to support the Portsmouth Paducah Project Office and the oversight of operations of the Depleted Uranium Hexafluoride (DUF6) Conversion Project located in Paducah KY, and Portsmouth OH. The RFQ is for a Time-and-Materials Task Order for three years with two one-year option periods. The estimated contract value is approximately $15 - 20 million.

490

DOE Issues Request for Quotations for Depleted Uranium Hexafluoride  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issues Request for Quotations for Depleted Uranium Hexafluoride Issues Request for Quotations for Depleted Uranium Hexafluoride Conversion Technical Services DOE Issues Request for Quotations for Depleted Uranium Hexafluoride Conversion Technical Services December 12, 2012 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The U.S. Department of Energy (DOE) today issued a Request for Quotation (RFQ) for engineering and operations technical services to support the Portsmouth Paducah Project Office and the oversight of operations of the Depleted Uranium Hexafluoride (DUF6) Conversion Project located in Paducah KY, and Portsmouth OH. The RFQ is for a Time-and-Materials Task Order for three years with two one-year option periods. The estimated contract value is approximately $15 - 20 million.

491

DOE Issues Guidance on Electric Vehicle Recharging Stations | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Issues Guidance on Electric Vehicle Recharging Stations DOE Issues Guidance on Electric Vehicle Recharging Stations DOE Issues Guidance on Electric Vehicle Recharging Stations September 6, 2011 - 4:28pm Addthis The U.S. Department of Energy recently issued guidance to its national laboratory management and operating (M&O) contractors on the installation and operation of electric vehicle recharging stations at lab facilities. The guidance explains that lab contractors wishing to install electric vehicle recharging stations or make such stations available to employees and visitors have several options. Lab contractors may install such stations and seek reimbursement from the Department for their use to the extent such installation or use is reasonably required to meet fleet vehicle or demonstration project needs.

492

Measuring Short-term Air Conditioner Demand Reductions for Operations...  

NLE Websites -- All DOE Office Websites (Extended Search)

frequently without affecting customer comfort. A key issue for grid operations and electricity market settlement is how to accurately measure shorter-term (e.g., ten's of...

493

Oconee Electrical Component Integrated Plant Assessment and Time Limited Aging Analyses for License Renewal: Parts 1 and 2  

Science Conference Proceedings (OSTI)

Duke Power Co. and Baltimore Gas and Electric Co. are the first two utilities to apply for license renewal of their nuclear units. This report is one in a series of EPRI reports providing the technical basis for the Oconee and Calvert Cliffs License Renewal Applications.

1998-11-30T23:59:59.000Z

494

Ethical Issues in Occupational Health  

NLE Websites -- All DOE Office Websites (Extended Search)

ETillCAL ISSUES IN ETillCAL ISSUES IN OCCUPATIONAL HEALTH Mary L. Doyle, MPH, RN, COHN-S/CM DOE Headquarters January 17, 2002 OH Ethical Issues * Autonomy * Confidentiality * Right to Know * Putcmalism * Informed Consent OH Ethical Issues * Beneficence: Actions that contribute to the welfare of others - Engineering controls - Exposure monitoring/ walk throughs - Health screening/ Health surveillance - Health promotion - Occupational Health Research Ethical Principles * Autonomy: The right to self-determination * Nonmaleficence: The duty to do no harm * Beneficence: Actions that contribute to the welfare of others * .Justice: Fairness or giving person what is due them OH Ethical Issues * Nonmale.ficence - High risk jobs - Second Party induced Hazards - Incompetent , wtethical, illegal practices

495

Distributed Generation Implementation Guidelines: Siting, Environmental Permitting, and Licensing  

Science Conference Proceedings (OSTI)

In 1997, EPRI conducted a study of how distributed generation (DG) was implemented at approximately 125 facilities in California and throughout the Midwest. The results of that study, as well as subsequent interviews with key facilities done the following year, enabled EPRI to present guidelines representative of a "best practices" approach to implementing and operating a DG facility based on the experience of others.

1998-12-16T23:59:59.000Z

496

Combustion engineering issues for solid fuel systems  

SciTech Connect

The book combines modeling, policy/regulation and fuel properties with cutting edge breakthroughs in solid fuel combustion for electricity generation and industrial applications. This book provides real-life experiences and tips for addressing the various technical, operational and regulatory issues that are associated with the use of fuels. Contents are: Introduction; Coal Characteristics; Characteristics of Alternative Fuels; Characteristics and Behavior of Inorganic Constituents; Fuel Blending for Combustion Management; Fuel Preparation; Conventional Firing Systems; Fluidized-Bed Firing Systems; Post-Combustion Emissions Control; Some Computer Applications for Combustion Engineering with Solid Fuels; Gasification; Policy Considerations for Combustion Engineering.

Bruce Miller; David Tillman [Pennsylvania State University, University Park, PA (United States). Energy Institute