National Library of Energy BETA

Sample records for operating licenses issued

  1. NETL Issues Licenses for its Arc Position Sensing Technology | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Issues Licenses for its Arc Position Sensing Technology NETL Issues Licenses for its Arc Position Sensing Technology May 27, 2015 - 8:57am Addthis NETL Issues Licenses for its Arc Position Sensing Technology The U.S. Department of Energy's National Energy Technology Laboratory (NETL) has issued two licenses involving its Arc Position Sensing (APS) technology to KW Associates LLC, an Oregon-based company founded by the technology's inventors. APS technology is a patented,

  2. Technical issues in licensing low-level radioactive waste facilities

    SciTech Connect (OSTI)

    Junkert, R.

    1993-03-01

    The California Department of Health Service spent two years in the review of an application for a low-level radioactive waste disposal facility in California. During this review period a variety of technical issues had to be evaluated and resolved. One of the first issues was the applicability and use of NRC guidance documents for the development of LLW disposal facilities. Other technical issues that required intensive evaluations included surface water hydrology, seismic investigation, field and numerical analysis of the unsaturated zone, including a water infiltration test. Source term verification became an issue because of one specific isotope that comprised more than 90% of the curies projected for disposal during the operational period. The use of trench liners and the proposed monitoring of the unsaturated zone were reviewed by a highly select panel of experts to provide guidance on the need for liners and to ensure that the monitoring system was capable of monitoring sufficient representative areas for radionuclides in the soil, soil gas, and soil moisture. Finally, concerns about the quality of the preoperational environmental monitoring program, including data, sample collection procedures, laboratory analysis, data review and interpretation and duration of monitoring caused a significant delay in completing the licensing review.

  3. Application of coupled codes for safety analysis and licensing issues

    SciTech Connect (OSTI)

    Langenbuch, S.; Velkov, K.

    2006-07-01

    An overview is given on the development and the advantages of coupled codes which integrate 3D neutron kinetics into thermal-hydraulic system codes. The work performed within GRS by coupling the thermal-hydraulic system code ATHLET and the 3D neutronics code QUABOX/CUBBOX is described as an example. The application of the coupled codes as best-estimate simulation tools for safety analysis is discussed. Some examples from German licensing practices are given which demonstrate how the improved analytical methods of coupled codes have contributed to solve licensing issues related to optimized and more economical use of fuel. (authors)

  4. Energy Department Issues Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a final Request for Proposal (RFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities contract is for managing Spent Nuclear Fuel (SNF) storage facilities and licenses under NRC regulations.

  5. Land based crane operator training and licensing program

    SciTech Connect (OSTI)

    Borg, R. van der; Dingman, S.

    1995-12-31

    Working safely and having a healthy respect for safety has always been important to the Corps of Engineers. Because we recognize the increased importance of safety to crane operations, we have developed this Training and Licensing program for all crane operators. What the guidelines and this program intends is, think before you act and thinking requires a knowledge base. We feel the following program strengthens the guidelines to enable competent as well as confident crane operations by our personnel. This document outlines the Corps of Engineer`s Land Based Crane Training and Licensing Program for Class I, II, and III operators. The Corps of Engineer`s Portland District Operation`s Division melded guidelines from industry with specific Corps regulations to produce this program. The Crane Licensing and Training program includes three crane operator classes. Each class discusses licensing, physical and academic requirements and performance evaluations. Other related personnel and their responsibilities are also discussed. These include rigger/signalmen, maintenance staff, and inspectors. A section on testing requirements for specific needs follows with a glossary at the end of this document.

  6. Energy Department Issues Draft Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition Planning.

  7. Resolution of thermal-hydraulic safety and licensing issues for the system 80+{sup {trademark}} design

    SciTech Connect (OSTI)

    Carpentino, S.E.; Ritterbusch, S.E.; Schneider, R.E.

    1995-09-01

    The System 80+{sup {trademark}} Standard Design is an evolutionary Advanced Light Water Reactor (ALWR) with a generating capacity of 3931 MWt (1350 MWe). The Final Design Approval (FDA) for this design was issued by the Nuclear Regulatory Commission (NRC) in July 1994. The design certification by the NRC is anticipated by the end of 1995 or early 1996. NRC review of the System 80+ design has involved several new safety issues never before addressed in a regulatory atmosphere. In addition, conformance with the Electric Power Research Institute (EPRI) ALWR Utility Requirements Document (URD) required that the System 80+ plant address nuclear industry concerns with regard to design, construction, operation and maintenance of nuclear power plants. A large number of these issues/concerns deals with previously unresolved generic thermal-hydraulic safety issues and severe accident prevention and mitigation. This paper discusses the thermal-hydraulic analyses and evaluations performed for the System 80+ design to resolve safety and licensing issues relevant to both the Nuclear Stream Supply System (NSSS) and containment designs. For the NSSS design, the Safety Depressurization System mitigation capability and resolution of the boron dilution concern are described. Examples of containment design issues dealing with containment shell strength, robustness of the reactor cavity walls and hydrogen mixing under severe accident conditions are also provided. Finally, the overall approach used in the application of NRC`s new (NUREG-1465) radiological source term for System 80+ evaluation is described. The robustness of the System 80+ containment design to withstand severe accident consequences was demonstrated through detailed thermal-hydraulic analyses and evaluations. This advanced design to shown to meet NRC severe accident policy goals and ALWR URD requirements without any special design features and unnecessary costs.

  8. DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear...

    Energy Savers [EERE]

    an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process ...

  9. Safety and licensing issues that are being addressed by the Power Burst Facility test programs. [PWR; BWR

    SciTech Connect (OSTI)

    McCardell, R.K.; MacDonald, P.E.

    1980-01-01

    This paper presents an overview of the results of the experimental program being conducted in the Power Burst Facility and the relationship of these results to certain safety and licensing issues. The safety issues that were addressed by the Power-Cooling-Mismatch, Reactivity Initiated Accident, and Loss of Coolant Accident tests, which comprised the original test program in the Power Burst Facility, are discussed. The resolution of these safety issues based on the results of the thirty-six tests performed to date, is presented. The future resolution of safety issues identified in the new Power Burst Facility test program which consists of tests which simulate BWR and PWR operational transients, anticipated transients without scram, and severe fuel damage accidents, is described.

  10. Status of safety issues at licensed power plants: TMI Action Plan requirements; unresolved safety issues; generic safety issues; other multiplant action issues. Supplement 3

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. This third annual NUREG report, Supplement 3, presents updated information as of September 30, 1993. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ``A Prioritization of Generic Safety Issues,`` which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees.

  11. Licensing of spent fuel dry storage and consolidated rod storage: A Review of Issues and Experiences

    SciTech Connect (OSTI)

    Bailey, W.J.

    1990-02-01

    The results of this study, performed by Pacific Northwest Laboratory (PNL) and sponsored by the US Department of Energy (DOE), respond to the nuclear industry's recommendation that a report be prepared that collects and describes the licensing issues (and their resolutions) that confront a new applicant requesting approval from the US Nuclear Regulatory Commission (NRC) for dry storage of spent fuel or for large-scale storage of consolidated spent fuel rods in pools. The issues are identified in comments, questions, and requests from the NRC during its review of applicants' submittals. Included in the report are discussions of (1) the 18 topical reports on cask and module designs for dry storage fuel that have been submitted to the NRC, (2) the three license applications for dry storage of spent fuel at independent spent fuel storage installations (ISFSIs) that have been submitted to the NRC, and (3) the three applications (one of which was later withdrawn) for large-scale storage of consolidated fuel rods in existing spent fuel storage pools at reactors that were submitted tot he NRC. For each of the applications submitted, examples of some of the issues (and suggestions for their resolutions) are described. The issues and their resolutions are also covered in detail in an example in each of the three subject areas: (1) the application for the CASTOR V/21 dry spent fuel storage cask, (2) the application for the ISFSI for dry storage of spent fuel at Surry, and (3) the application for full-scale wet storage of consolidated spent fuel at Millstone-2. The conclusions in the report include examples of major issues that applicants have encountered. Recommendations for future applicants to follow are listed. 401 refs., 26 tabs.

  12. Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report

    Broader source: Energy.gov [DOE]

    The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States.

  13. Site selection and licensing issues: Southwest Compact low-level radioactive waste disposal site

    SciTech Connect (OSTI)

    Grant, J.L.

    1989-11-01

    The low-level radioactive waste disposal site in California is being selected through a three-phase program. Phase 1 is a systematic statewide, regional, and local screening study. This program was conducted during 1986 and 1987, and culminated in the selection of three candidate sites fur further study. The candidate sites are identified as the Panamint, Silurian, and Ward Valley sites. Phase 2 comprises site characterization and environmental and socio-economic impact study activities at the three candidate sites. Based upon the site characterization studies, the candidate sites are ranked according to the desirability and conformance with regulatory requirements. Phase 3 comprises preparation of a license application for the selected candidate site. The license application will include a detailed characterization of the site, detailed design and operations plans for the proposed facility, and assessments of potential impacts of the site upon the environment and the local communities. Five types of siting criteria were developed to govern the site selection process. These types are: technical suitability exclusionary criteria, high-avoidance criteria beyond technical suitability requirements, discretionary criteria, public acceptance, and schedule requirements of the LLWR Policy Act Amendments. This paper discusses the application of the hydrological and geotechnical criteria during the siting and licensing studies in California. These criteria address site location and performance, and the degree to which present and future site behavior can be predicted. Primary regulatory requirements governing the suitability of a site are that the site must be hydrologically and geologically simple enough for the confident prediction of future behavior, and that the site must be stable enough that frequent or intensive maintenance of the closed site will not be required. This paper addresses the methods to measure site suitability at each stage of the process, methods to

  14. Operational Issues at the Environmental Restoration Disposal Facility at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford | Department of Energy Operational Issues at the Environmental Restoration Disposal Facility at Hanford Operational Issues at the Environmental Restoration Disposal Facility at Hanford Full Document and Summary Versions are available for download Operational Issues at the Environmental Restoration Disposal Facility at Hanford (238.34 KB) Summary - Operational Issues at the Environmental Restoration Disposal Facility (ERDF) at Hanford (56.27 KB) More Documents & Publications Idaho

  15. Challenge # 3 … Operational Issues | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 … Operational Issues Challenge # 3 … Operational Issues Fernando Preto presentation on May 9, 2012, at the Pyrolysis Oil Workshop on Challenge #3 Operational Issues. pyrolysis_challenge3.pdf (1.15 MB) More Documents & Publications U.S., Canada, and Finland Pyrolysis Collaborations Technical Information Exchange on Pyrolysis Oil: Potential for a Renewab;e Heating Oil Substation Fuel in New England 2013 Peer Review Presentations-Bio-oil

  16. DOE Issues Request for Information for Richland Operations Office...

    Office of Environmental Management (EM)

    Contract Acquisition Planning- Occupational Medical Services (OccMed) DOE Issues Request for Information for Richland Operations Office Richland Acquisitions - Post Fiscal Year ...

  17. Fundamental Issues in Subzero PEMFC Startup and Operation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fundamental issues in subzero PEMFC startup and operation Jeremy P. Meyers February 1, 2005 DOE Freeze Workshop Outline of presentation * Motivation * Stack performance * ...

  18. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    Until 1994, Florida offered limited specialty licenses for residential solar hot water and pool heating, as well a general solar contractor's license. These specialty licenses have not been issued...

  19. Licensed operating reactors. Status summary report data as of December 31, 1993

    SciTech Connect (OSTI)

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  20. Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19

    SciTech Connect (OSTI)

    1995-04-01

    The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  1. DOE LABORATORY OPEN SOURCE SOFTWARE: ADVANCE DOE PROGRAM Approval and other oss Licensing Issues

    Broader source: Energy.gov [DOE]

    On Feb 1, 2002, DOE Patent Counsel issued an IPI-II-1-01 for "Development and Use of Open Source Software."

  2. Issues in the review of a license application for an above grade low-level radioactive waste disposal facility

    SciTech Connect (OSTI)

    Ringenberg, J.D.

    1993-03-01

    In December 1987, Nebraska was selected by the Central Interstate Compact (CIC) Commission as the host state for the construction of a low-level radioactive waste disposal facility. After spending a year in the site screening process, the Compact`s developer, US Ecology, selected three sites for detailed site characterization. These sites were located in Nemaha, Nuckolls and Boyd Counties. One year later the Boyd County site was selected as the preferred site and additional site characterization studies were undertaken. On July 29, 1990, US Ecology submitted a license application to the Nebraska Department of Environmental Control (now Department of Environmental Quality-NDEQ). This paper will present issues that the NDEQ has dealt with since Nebraska`s selection as the host state for the CIC facility.

  3. Master Software License Agreement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... that system. 4. SCOPE OF LICENSE USE. Regardless of the ... and use the Product in support of GE's internal, research ... consolidate computer or network operations), andor other ...

  4. Operational Issues at the Environmental Restoration Disposal Facility at Hanford

    Office of Environmental Management (EM)

    Operating Guidelines Appendix C D.DOC� Operating Guidelines Appendix C D.DOC� Operating Guidelines Appendix C D.DOC� (41.73 KB) More Documents & Publications Operating Guidelines Appendix A B.DOC� DOE HR Guidebook 12_15_05.DOC� Questions and Answers 202-05-03 | Department of Energy

    Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03

  5. Fundamental Issues in Subzero PEMFC Startup and Operation

    Broader source: Energy.gov [DOE]

    Presentation by Jeremy Meyers to DOE's Fuel Cell Operations at Sub-Freezing Temperatures Workshop held February 1-5, 2005 in Phoenix, Arizona.

  6. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Ames Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor to operate Ames...

  7. Licensing | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensing Argonne's Technology Development & Commercialization (TDC) Division negotiates and manages license agreements on behalf of UChicago Argonne, LLC, which operates Argonne National Laboratory for the U.S. Department of Energy. Argonne licenses a broad range of cutting-edge technologies to private industry. The TDC team seeks as licensees companies that can manage the requisite financial, research and development, manufacturing, marketing, and management functions necessary to

  8. License Structure for Multi-Module Facilities

    SciTech Connect (OSTI)

    Thomas Hicks

    2010-08-01

    The Next Generation Nuclear Plant (NGNP) Project is intended to be the prototype for multi-module commercial high temperature gas reactors (HTGRs) for process heat and/or electricity generation. Part of the objectives of the project are to establish the conditions that would govern or enhance the design, licensing, construction and operation of numerous, modular nuclear plants, particularly suited for industrial applications or that could reduce the risk of such projects. A determination is desired regarding whether a multi-module reactor plant can be licensed with a single Nuclear Regulatory Commission (NRC) review, hearing, and safety evaluation report. If it is determined that a multi-modular reactor plant can be licensed under a single review/hearing process, the structure and the duration of the license for each module will also need to be determined. The purpose of this paper is to describe for the NRC the NGNP position on these two issues and obtain either NRC general concurrence or comments on the approach to these issues. While the current NGNP planning provides for only a single reactor module, the project is intended to provide the basis and establish a licensing framework that can be used by future commercial HTGRs and other reactor designs, including a variety of small modular reactor technologies, with configurations reflecting design standardization of multi-module plants. Therefore, it is important to identify a path for addressing these modular reactor plant issues so that the resolution can be factored into the NGNP Project planning. The NGNP position is that a single combined license (COL) application can be submitted for a multi-modular reactor facility, the COL application can undergo a single NRC review/hearing process, and each module should be issued a separate license.

  9. DOE Issues Final Request for Proposal for the Operation of Depleted Uranium

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hexafluoride (DUF6) Conversion Facilities | Department of Energy the Operation of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities DOE Issues Final Request for Proposal for the Operation of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities September 8, 2015 - 3:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP), for the Operation of Depleted

  10. Licensing Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensing Technology Licensing Technology The primary function of Los Alamos Licensing Program is to move Los Alamos technology to the marketplace for the benefit of the U.S. economy. Our intellectual property may be licensed for commercial use, research applications, and U.S. government use. Contact thumbnail of Marcus Lucero Head of Licensing Marcus Lucero Richard P. Feynman Center for Innovation (505) 665-6569 Email Although Los Alamos's primary mission is national security, our technologies

  11. DOE Issues Safety Assessments for Diesel-Operated Equipment Underground at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 5, 2015 DOE Issues Safety Assessments for Diesel-Operated Equipment Underground at WIPP The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department of Energy's independent Office of Enterprise Assessments (EA), recently issued reports following reviews conducted on the WIPP Recovery Plan for Operating Diesel Equipment with available underground airflows and the Conduct of Maintenance and associated planned program enhancements. The onsite portions of the

  12. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    its Princeton Plasma Physics Laboratory | Department of Energy Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a contractor to manage and operate Princeton Plasma Physics Laboratory (PPPL), a DOE Office of Science research facility

  13. Issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issue One of the challenges at Sandia National Laboratories is addressing the issue of predictively connecting the macroscopic properties of metals to their micro- and nanostructure. While this issue may seem straightforward, it is anything but trivial. Materials are intrinsically inhomogeneous, but the relationship between microstructural variability and resulting properties is often unknown. Approach PPM is comprised of a group of multidisciplinary staff, post-docs, and university

  14. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Argonne National Laboratory | Department of Energy Argonne National Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Argonne National Laboratory April 19, 2006 - 10:23am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximated $2.54 billion, five-year management and operating contract for Argonne National Laboratory (ANL), a DOE Office

  15. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fermi National Accelerator Laboratory | Department of Energy Fermi National Accelerator Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory July 10, 2006 - 2:57pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximately $1.58 billion, five-year management and operating contract for Fermi National

  16. DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) issued a Draft Request for Proposal (RFP) seeking a management and operations contractor to maintain the Waste Isolation Pilot Plan (WIPP) and manage the DOE National Transuranic Waste (TRU) Program in Carlsbad, New Mexico.

  17. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Revision 14 Job Hazard Analysis Performance and Development Management Control Procedure EFFECTIVE DATE: 03/30/16 Tom Ferguson APPROVED FOR USE WP 12-IS3002 ISSUED WP 12-IS3002 Rev. 14 Page 2 of 22 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 3 INTRODUCTION ............................................................................................................. 4 REFERENCES

  18. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    02/09/16 WP 15-HS.02 Revision 9 Occupational Health Program Cognizant Department: Safety and Health Approved by: Tom Ferguson ISSUED WIPP Occupational Health Program WP 15-HS.02, Rev. 9 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 4 ABBREVIATIONS AND ACRONYMS ............................................................................. 5 PREFACE

  19. File System Licenses in SLURM

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    File System Licenses in SLURM Introduction Users can now specify the filesystems required for their jobs by requesting "licenses" for them in their batch scripts. With this new SLURM license feature, a batch job will not start if the specified file system is unavailable due to maintenance or an outage, or if we've detected that it's having performance issues. This will protect your jobs from failures or decreased performance from known issues. We encourage everyone to use the SLURM

  20. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Effective Date: 10/01/15 WP 15-GM.02 Revision 10 Worker Safety and Health Program Description Cognizant Section: Industrial Safety & Health Approved by: Signature on File Phil Breidenbach, President & Project Manager, NWP Approved by: Signature on File Dana Bryson, Acting Manager, CBFO ISSUED Worker Safety and Health Program Description WP 15-GM.02, Rev. 10 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 4

  1. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12/01/15 WP 15-GM.03 Revision 9 Integrated Safety Management System Description Cognizant Section: Environmental, Safety and Health Approved by: Signature on File / 11/16/15 Phil Breidenbach, President & Project Manager, NWP Date Approved by: Signature on File / 11/30/15 Todd Shrader Manager, CBFO Date ISSUED Integrated Safety Management System Description WP 15-GM.03, Rev. 9 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY

  2. Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

    SciTech Connect (OSTI)

    Wang, Liping; Hong, Tianzhen

    2013-01-01

    Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensors used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1) direct

  3. Summary - Operational Issues at the Environmental Restoration Disposal Facility (ERDF) at Hanford

    Office of Environmental Management (EM)

    ERDF ETR Report Date: June 2007 ETR-6 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Operational Issues at the Environmental Restoration Disposal Facility(ERDF) at Hanford Why DOE-EM Did This Review The ERDF is a large- scale disposal facility authorized to receive waste from Hanford cleanup activities. It contains double-lined cells with a RCRA Subtitle C- type liner and leachate collection system. By 2007, 6.8 million tons of

  4. Uranium-Loaded Water Treatment Resins: 'Equivalent Feed' at NRC and Agreement State-Licensed Uranium Recovery Facilities - 12094

    SciTech Connect (OSTI)

    Camper, Larry W.; Michalak, Paul; Cohen, Stephen; Carter, Ted

    2012-07-01

    Community Water Systems (CWSs) are required to remove uranium from drinking water to meet EPA standards. Similarly, mining operations are required to remove uranium from their dewatering discharges to meet permitted surface water discharge limits. Ion exchange (IX) is the primary treatment strategy used by these operations, which loads uranium onto resin beads. Presently, uranium-loaded resin from CWSs and mining operations can be disposed as a waste product or processed by NRC- or Agreement State-licensed uranium recovery facilities if that licensed facility has applied for and received permission to process 'alternate feed'. The disposal of uranium-loaded resin is costly and the cost to amend a uranium recovery license to accept alternate feed can be a strong disincentive to commercial uranium recovery facilities. In response to this issue, the NRC issued a Regulatory Issue Summary (RIS) to clarify the agency's policy that uranium-loaded resin from CWSs and mining operations can be processed by NRC- or Agreement State-licensed uranium recovery facilities without the need for an alternate feed license amendment when these resins are essentially the same, chemically and physically, to resins that licensed uranium recovery facilities currently use (i.e., equivalent feed). NRC staff is clarifying its current alternate feed policy to declare IX resins as equivalent feed. This clarification is necessary to alleviate a regulatory and financial burden on facilities that filter uranium using IX resin, such as CWSs and mine dewatering operations. Disposing of those resins in a licensed facility could be 40 to 50 percent of the total operations and maintenance (O and M) cost for a CWS. Allowing uranium recovery facilities to treat these resins without requiring a license amendment lowers O and M costs and captures a valuable natural resource. (authors)

  5. Issue Paper Potential Water Availability Problems Associated with Geothermal Energy Operations

    SciTech Connect (OSTI)

    1982-02-19

    The report is the first to study and discuss the effect of water supply problems of geothermal development. Geothermal energy resources have the potential of making a significant contribution to the U.S. energy supply situation, especially at the regional and local levels where the resources are located. A significant issue of concern is the availability and cost of water for use in a geothermal power operation primarily because geothermal power plants require large quantities of water for cooling, sludge handling and the operation of environmental control systems. On a per unit basis, geothermal power plants, because of their inherent high heat rejection rates, have cooling requirements several times greater than the conventional fossil fuel plants and therefore the supply of water is a critical factor in the planning, designing, and siting of geothermal power plants. However, no studies have been specifically performed to identify the water requirements of geothermal power plants, the underlying causes of water availability problems, and available techniques to alleviate some of these problems. There is no cost data included in the report. The report includes some descriptions of known geothermal areas. [DJE-2005

  6. Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues

    SciTech Connect (OSTI)

    Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

    2008-07-01

    California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

  7. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    Utah's Division of Occupational and Professional Licensing requires installers of solar energy systems to be licensed contractors. General electrical contractors carrying an S200 or an S201...

  8. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    Hawaii offers several specialty licenses for solar contractors through Hawaii’s Department of Commerce and Consumer Affairs. The following specialty licenses are available: Solar Power Systems...

  9. Texas site selection and licensing status

    SciTech Connect (OSTI)

    Avant, R.V. Jr.

    1989-11-01

    Texas has identified a potential site in Hudspeth County in far West Texas near the town of Fort Hancock. Over the past year the Texas Low-Level Radioactive Waste Disposal Authority has been conducting detailed geology, hydrology, meteorology, soils, and flora and fauna evaluations. An authorization by the Board of Directors of the Authority to proceed with a license application, assuming that the detailed evaluation indicates that the site is suitable, is expected by September. A prototype license has been prepared in anticipation of the order to proceed with licensing, and the formal license application is expected to be submitted to the Texas Department of Health-Bureau of Radiation Control in December, meeting the license application milestone. Although site selection processes in all siting areas across the country have experienced organized opposition, El Paso County has funded a particularly well-organized, well-financed program to legally and technically stop consideration of the Fort Hancock site prior to the licensing process. Many procedural, regulatory, and technical issues have been raised which have required responses from the Authority in order to proceed with licensing. This has provided a unique perspective of what to expect from well-organized opposition at the licensing stage. This paper presents an update on the Texas siting activity with detailed information on the site evaluation and license application. Experience of dealing with issues raised by opposition relating to NRC guidelines and rules is also discussed.

  10. Exposure Based Health Issues Project Report: Phase I of High Level Tank Operations, Retrieval, Pretreatment, and Vitrification Exposure Based Health Issues Analysis

    SciTech Connect (OSTI)

    Stenner, Robert D.; Bowers, Harold N.; Kenoyer, Judson L.; Strenge, Dennis L.; Brady, William H.; Ladue, Buffi; Samuels, Joseph K.

    2001-11-30

    The Department of Energy (DOE) has the responsibility to understand the ''big picture'' of worker health and safety which includes fully recognizing the vulnerabilities and associated programs necessary to protect workers at the various DOE sites across the complex. Exposure analysis and medical surveillance are key aspects for understanding this big picture, as is understanding current health and safety practices and how they may need to change to relate to future health and safety management needs. The exposure-based health issues project was initiated to assemble the components necessary to understand potential exposure situations and their medical surveillance and clinical aspects. Phase I focused only on current Hanford tank farm operations and serves as a starting point for the overall project. It is also anticipated that once the pilot is fully developed for Hanford HLW (i.e., current operations, retrieval, pretreatment, vitrification, and disposal), the process and analysis methods developed will be available and applicable for other DOE operations and sites. The purpose of this Phase I project report is to present the health impact information collected regarding ongoing tank waste maintenance operations, show the various aspects of health and safety involved in protecting workers, introduce the reader to the kinds of information that will need to be analyzed in order to effectively manage worker safety.

  11. NREL: Technology Transfer - Licensing Agreements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    using, and selling of the licensed technology, methods, or products. 5. Negotiate License Language The company then reviews and comments on the license agreement draft. If needed,...

  12. DOE Issues Final Request for Proposal for the Operation of Depleted...

    Broader source: Energy.gov (indexed) [DOE]

    Operation of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities at Paducah, Kentucky and Portsmouth, Ohio. A cost-plus award fee and firm-fixed-price contract line item ...

  13. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2

    SciTech Connect (OSTI)

    1996-02-01

    NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  14. Task 23 - background report on subsurface environmental issues relating to natural gas sweetening and dehydration operations. Topical report, February 1, 1994--February 28, 1996

    SciTech Connect (OSTI)

    Sorensen, J.A.

    1998-12-31

    This report describes information pertaining to environmental issues, toxicity, environmental transport, and fate of alkanolamines and glycols associated with natural gas sweetening and dehydration operations. Waste management associated with the operations is also discussed.

  15. Renewable Energy Contractor Licensing

    Broader source: Energy.gov [DOE]

    Companies with an electrical contractor license may engage in the business of making electrical installations. Similarly a plumbing contractor license allows a company to engage in the business of...

  16. Licensing Process | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensing Process Through licensing of its intellectual property rights, NREL provides industry with an opportunity to commercialize NREL-developed energy technologies and products. Our licensing opportunities are available to both small and large businesses-from start-ups to Fortune 500 companies. Step-by-Step Process 1. Identify and Qualify Opportunity To identify a licensing opportunity, a company can browse the Energy Innovation Portal. From the Portal, the company can review publically

  17. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    SciTech Connect (OSTI)

    Eugene S. Grecheck David P. Batalo

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  18. Renewing the licenses of US nuclear plants: An assessment of the socioeconomic impacts

    SciTech Connect (OSTI)

    Schweitzer, M.; Saulsbury, J.W. ); Schexnayder, S.M. )

    1993-01-01

    In recent years, increased national attention has been focused on the potential effects of renewing, or not renewing, the licenses of nuclear power plants as the oldest of them approach the end of the 40-year operating period allowed by their original licenses. As part of a larger study for the US Nuclear Regulatory commission (NRC), the authors conducted an assessment of the potential socioeconomic impacts to those communities throughout the country in which nuclear power plants are located and which, therefore, are most directly affected by renewal of nuclear power plant licenses. This paper focuses on six key issues that are traditionally considered essential in the assessment of social impacts: Population; housing; tax payments; local public services; land use and development; and economic structure.

  19. Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 4: June 8, 2009 Vehicles per Licensed Driver Rising Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising The number of vehicles in operation per licensed driver has risen steadily since 1950. In 1985, for the first time, there was one vehicle for every licensed driver. Since 1985, the number of vehicles in operation has exceeded the number of licensed drivers reaching a level of 1.21 vehicles per licensed driver in 2007. Vehicles per Licensed Driver, 1950-2007 Line graph

  20. Investigation on Flame Characteristics and Burner Operability Issues of Oxy-Fuel Combustion

    SciTech Connect (OSTI)

    Choudhuri, Ahsan

    2013-09-30

    Oxy-fuel combustion has been used previously in a wide range of industrial applications. Oxy- combustion is carried out by burning a hydrocarbon fuel with oxygen instead of air. Flames burning in this configuration achieve higher flame temperatures which present opportunities for significant efficiency improvements and direct capture of CO2 from the exhaust stream. In an effort to better understand and characterize the fundamental flame characteristics of oxy-fuel combustion this research presents the experimental measurements of flame stability of various oxyfuel flames. Effects of H2 concentration, fuel composition, exhaust gas recirculation ratio, firing inputs, and burner diameters on the flame stability of these fuels are discussed. Effects of exhaust gas recirculation i.e. CO2 and H2O (steam) acting as diluents on burner operability are also presented. The roles of firing input on flame stability are then analyzed. For this study it was observed that many oxy-flames did not stabilize without exhaust gas recirculation due to their higher burning velocities. In addition, the stability regime of all compositions was observed to decrease as the burner diameter increased. A flashback model is also presented, using the critical velocity gradient gF) values for CH4-O2-CO2 flames. The second part of the study focuses on the experimental measurements of the flow field characteristics of premixed CH4/21%O2/79%N2 and CH4/38%O2/72%CO2 mixtures at constant firing input of 7.5 kW, constant, equivalence ratio of 0.8, constant swirl number of 0.92 and constant Reynolds Numbers. These measurements were taken in a swirl stabilized combustor at atmospheric pressure. The flow field visualization using Particle Imaging Velocimetry (PIV) technique is implemented to make a better understanding of the turbulence characteristics of

  1. Licensable Life Science Technologies | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensable Life Science Technologies A selection of biology-based technologies available for licensing PDF icon licensable_biological_technologies

  2. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    The Arizona Registrar of Contractors does have a specific plumbing license which includes solar water heaters. R-37 is required for contractors installing or performing maintenance on residential...

  3. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    In June 2005, Assembly Bill 3 amended the Nevada Revised Statutes, Chapter 618, to create a mandatory licensing program for contractors installing and maintaining photovoltaic systems, beginning...

  4. Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification, Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance

    SciTech Connect (OSTI)

    R. Fink, D. Hill, J. O'Hara

    2004-11-30

    Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.

  5. Analysis of environmental issues related to small-scale hydroelectric development. VI. Dissolved oxygen concentrations below operating dams

    SciTech Connect (OSTI)

    Cada, G.F.; Kumar, K.D.; Solomon, J.A.; Hildebrand, S.G.

    1982-01-01

    Results are presented of an effort aimed at determining whether or not water quality degradation, as exemplified by dissolved oxygen concentrations, is a potentially significant issue affecting small-scale hydropower development in the US. The approach was to pair operating hydroelectric sites of all sizes with dissolved oxygen measurements from nearby downstream US Geological Survey water quality stations (acquired from the WATSTORE data base). The USGS data were used to calculate probabilities of non-compliance (PNCs), i.e., the probabilities that dissolved oxygen concentrations in the discharge waters of operating hydroelectric dams will drop below 5 mg/l. PNCs were estimated for each site, season (summer vs remaining months), and capacity category (less than or equal to 30 MW vs >30 MW). Because of the low numbers of usable sites in many states, much of the subsequent analysis was conducted on a regional basis. During the winter months (November through June) all regions had low mean PNCs regardless of capacity. Most regions had higher mean PNCs in summer than in winter, and summer PNCs were greater for large-scale than for small-scale sites. Among regions, the highest mean summer PNCs were found in the Great Basin, the Southeast, and the Ohio Valley. To obtain a more comprehensive picture of the effects of season and capacity on potential dissolved oxygen problems, cumulative probability distributions of PNC were developed for selected regions. This analysis indicates that low dissolved oxygen concentrations in the tailwaters below operating hydroelectric projects are a problem largely confined to large-scale facilities.

  6. NEXT GENERATION NUCLEAR PLANT LICENSING BASIS EVENT SELECTION WHITE PAPER

    SciTech Connect (OSTI)

    Mark Holbrook

    2010-09-01

    The Next Generation Nuclear Plant (NGNP) will be a licensed commercial high temperature gas-cooled reactor (HTGR) plant capable of producing the electricity and high temperature process heat for industrial markets supporting a range of end-user applications. The NGNP Project has adopted the 10 CFR 52 Combined License (COL) application process, as recommended in the Report to Congress, dated August 2008, as the foundation for the NGNP licensing strategy. NRC licensing of the NGNP plant utilizing this process will demonstrate the efficacy of licensing future HTGRs for commercial industrial applications. This white paper is one in a series of submittals that will address key generic issues of the COL priority licensing topics as part of the process for establishing HTGR regulatory requirements.

  7. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1

    SciTech Connect (OSTI)

    1996-02-01

    NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  8. License Iso. CM35

    Office of Legacy Management (LM)

    Reither this license nor my right under this licewe shall be uslgned or otherwise traneferred in violation of the pmvislont of the Atalc Finer&y Act oi 19%. ' Ibis licenae haJ..l ...

  9. License for the Konrad Deep Geological Repository

    SciTech Connect (OSTI)

    Biurrun, E.; Hartje, B.

    2003-02-24

    Deep geological disposal of long-lived radioactive waste is currently considered a major challenge. Until present, only three deep geological disposal facilities have worldwide been operated: the Asse experimental repository (1967-1978) and the Morsleben repository (1971-1998) in Germany as well as the Waste Isolation Pilot Plant (WIPP) in the USA (1999 to present). Recently, the licensing procedure for the fourth such facility, the German Konrad repository, ended with a positive ''Planfeststellung'' (plan approval). With its plan approval decision, the licensing authority, the Ministry of the Environment of the state of Lower Saxony, approved the single license needed pursuant to German law to construct, operate, and later close down this facility.

  10. TTWG Licensing Guide | Department of Energy

    Energy Savers [EERE]

    TTWG Licensing Guide TTWG Licensing Guide PDF icon TTWG Licensing Guide More Documents & Publications ITP Aluminum: Technical Working Group on Inert Anode Technologies EIS-0333:...

  11. Licensing Technologies | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensing Technologies Licensing Technologies New tack cloth leaves no sticky residue. A license is a means of transferring commercial rights for technologies developed at Y-12 to...

  12. License Iso. CM35

    Office of Legacy Management (LM)

    License Iso. CM35 hUhUll4MhiM&POlltYll7~ llolh-thRqalStract Alolan&le, vlrghla Attoatlonl w. & 0. EutahlDon Pursuant to the Atanic Energy Act of 1954 and Section 40.21 or the Code of Federal Regulations, Title 10 - Atomic Energy, Chapter 1, Part 40 - Control of Sauce Haterid, you are hereby licensed to receive possession of and title to three hundred uwi l lght the term of this liceaee for pounda of refined eource material during 880 in meueb and demlopmt aotiritim MDool.atd lfltb

  13. Energy Department Issues Draft Request for Proposals for Operation of its Pacific Northwest National Laboratory in Washington

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued a draft Request for Proposals (RFP) for prospective contractors who are interested in competing on a full and open basis to manage...

  14. Solar Hot Water Contractor Licensing

    Broader source: Energy.gov [DOE]

    In order to obtain one of these specialty licenses, installers must meet the following criteria. The applicant for a Restricted Solar Mechanic license must provide the Arkansas Department of...

  15. NREL: Technology Transfer - Technologies Available for Licensing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ombuds. Printable Version Technology Transfer Home About Technology Transfer Technology Partnership Agreements Licensing Agreements Technologies Available for Licensing...

  16. Combined Construction and Operating License (COL)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... REACTOR SIZE (MWE) APPLICATION EXPECTED SUBMITTAL DATE Light Water Reactors Babcock &Wilcox mPower, Inc. mPower SMR 180 DC CP Late 2013 March 2014 Holtec International ...

  17. Combined Construction and Operating License (COL)

    Broader source: Energy.gov (indexed) [DOE]

    Forge Corporation announced an agreement with Babcock and Wilcox Company to fabricate and qualify large forgings for the B&W mPower SMR. Forgings would be manufactured at Lehigh ...

  18. NRC Licensing Status Summary Report for NGNP

    SciTech Connect (OSTI)

    Moe, Wayne Leland; Kinsey, James Carl

    2014-11-01

    The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction and operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.

  19. Non-exclusive patent license agreement between Alliance and company

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Page 1 of 19 NON-EXCLUSIVE PATENT LICENSE AGREEMENT Between Alliance for Sustainable Energy, LLC And [COMPANY NAME] This License Agreement (hereinafter "Agreement"), which shall be effective on the date it is executed by the last Party to sign (the "Effective Date"), below is between Alliance for Sustainable Energy, LLC (hereinafter "Alliance"), Management and Operating Contractor for the National Renewable Energy Laboratory (hereinafter "NREL") located

  20. Exclusive Patent License Agreement between Alliance and company

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Page 1 of 19 EXCLUSIVE PATENT LICENSE AGREEMENT Between Alliance for Sustainable Energy, LLC And [COMPANY NAME] This License Agreement (hereinafter "Agreement"), which shall be effective on the date it is executed by the last Party to sign (the "Effective Date") below, is between Alliance for Sustainable Energy, LLC (hereinafter "Alliance"), Management and Operating Contractor for the National Renewable Energy Laboratory (hereinafter "NREL") located at

  1. NETL Partnership and Licensing Agreements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A CRADA allows for joint research projects between NETL and either public or private ... An Intellectual Property License transfers NETL-owned IP from government sector to private ...

  2. Nuclear reactor characteristics and operational history

    Gasoline and Diesel Fuel Update (EIA)

    Application License Renewal Issued Extended Expiration Arkansas Nuclear One 1 PWR Babcock&Wilcox, Lower Loop 1011968 8171974 5202014 212000 6202001 5202034 Arkansas ...

  3. DOE Issues Request for Information for Richland Operations Office Richland Acquisitions – Post Fiscal Year 2018 Contract(s) Acquisition Planning

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center today issued a Sources Sought/Request for Information (RFI) seeking interested parties with specialized capabilities necessary to successfully perform all or a portion of the elements of scope for a potential upcoming competitive Environmental Management (EM) procurement(s) for the environmental cleanup projects and Hanford Site infrastructure and services at the Richland Operations Office (RL), hereafter referred to as “Richland Acquisitions – Post Fiscal Year 2018 Contract(s)” and to further determine whether or not all or a portion of the work can be set-aside for small and disadvantaged businesses.

  4. Cleanup of Nuclear Licensed Facility 57

    SciTech Connect (OSTI)

    Jeanjacques, Michel; Bremond, Marie Pierre; Marchand, Carole; Poyau, Cecile; Viallefont, Cecile; Gautier, Laurent; Masure, Frederic

    2008-01-15

    This summary describes the operations to clean up the equipment of the Nuclear Licensed Facility 57 (NLF 57). Due to the diversity of the research and development work carried out on the reprocessing of spent fuel in it, this installation is emblematic of many of the technical and organizational issues liable to be encountered in the final closure of nuclear facilities. The French atomic energy commission's center at Fontenay aux Roses (CEA-FAR) was created in 1946 to house pile ZOE. Laboratories for fuel cycle research were installed in existing buildings at the site. Work was later concentrated on spent fuel reprocessing, in a pilot workshop referred to as the 'Usine Pu'. In the early sixties, after the dismantling of these first generation facilities, a radiochemistry laboratory dedicated to research and development work on reprocessing was constructed, designated Building 18. During the same decade, more buildings were added: Building 54, storehouses and offices, Building 91, a hall and laboratories for chemical engineering research on natural and depleted uranium. Together, these three building constitute NLF 57. Building 18 architecture featured four similar modules. Each module had three levels: a sub-level consisting of technical galleries and rooms for the liquid effluent tanks, a ground floor and roof space in which the ventilation was installed. Offices, change rooms, four laboratories and a hall were situated on the ground floor. The shielded lines were installed in the laboratories and the halls. Construction of the building took place between 1959 and 1962, and its commissioning began in 1961. The research and development programs performed in NLF 57 related to studies of the reprocessing of spent fuel, including dry methods and the Purex process, techniques for the treatment of waste (vitrification, alpha waste decontamination, etc.) as well as studies and production of transuranic elements for industry and research. In addition to this work, the

  5. The Atomic Safety and Licensing Board Panel

    SciTech Connect (OSTI)

    1998-03-01

    Through the Atomic Energy Act, Congress made is possible for the public to get a full and fair hearing on civilian nuclear matters. Individuals who are directly affected by any licensing action involving a facility producing or utilizing nuclear materials may participate in a formal hearing, on the record, before independent judges on the Atomic Safety and Licensing Board Panel (ASLBP or Panel). Frequently, in deciding whether a license, permit, amendment, or extension should be granted to a particular applicant, the Panel members must be more than mere umpires. If appropriate, they are authorized to go beyond the issues the parties place before them in order to identify, explore, and resolve significant questions involving threats to the public health and safety that come to a board`s attention during the proceedings. This brochure explains the purpose of the panel. Also addressed are: type of hearing handled; method of public participation; formality of hearings; high-level waste; other panel responsibilities and litigation technology.

  6. Property:FERC License | Open Energy Information

    Open Energy Info (EERE)

    FERC License Jump to: navigation, search Property Name FERC License Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense&oldid610683...

  7. NREL: Technology Transfer - Nonexclusive and Exclusive Licenses

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    sold utilizing the licensed technology. The fees and payments vary depending on the business model, market(s), and the number of patents licensed. Exclusive NREL grants an...

  8. intellectual property license | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    intellectual property license Intellectual Property License Agreements transfer NETL-owned intellectual property (IP) from the government to the private sector both exclusively and...

  9. Issue: K

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issue: K Author: Mark D. Ivey Page 1 of 24 DR 6 / 30 / 2010 ES&H STANDARD OPERATING PROCEDURE (ES&H SOP) Title: ATMOSPHERIC RADIATION MEASUREMENT CLIMATE RESEARCH FACILITY/NORTH SLOPE OF ALASKA/ADJACENT ARCTIC OCEAN (ACRF/NSA/AAO) PROJECT OPERATING PLAN (U) Location: North Slope of Alaska and Adjacent Arctic Ocean Owners: Mark D Ivey, Department 6383, Manager Mark D Ivey, Department 6383, ACRF/NSA/AAO Site Project Manager and Site ES&H Coordinator Document Release or Change History:

  10. Safety Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Safety Orientation April, 2015 Atmospheric Radiation Measurement Climate Research Facility/ North Slope of Alaska/Adjacent Arctic Ocean (ACRF/NSA/AAO) Site Safety Orientation Purpose This document provides an overview and summary of safety issues and safe work practices associated with operations at the Atmospheric Radiation Measurement Climate Research Facility/North Slope of Alaska/Adjacent Arctic Ocean (ACRF/NSA/AAO) Sites. It is intended for site visitors as well as routine site

  11. Challenge # 3 … Operational Issues

    Broader source: Energy.gov (indexed) [DOE]

    knowledge gaps that need to be closed order for industry to establish the ... Kgh 697.6 715.2 669.7 690.1 684.1 652.1 421.1 Combustion Air Temperature C 116.7 45.5 ...

  12. Solar and Wind Contractor Licensing

    Broader source: Energy.gov [DOE]

    In June of 2014, SB 447 mandated that the Louisiana State Licencsing Board for Contractors develop new rules for solar contractors no later than January 1, 2015. Licensed contractors must be in c...

  13. Licensing Oppurtunities | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensing Oppurtunities The Ames Laboratory's Contract allows for Privately Funded Technology Transfer (PFTT). PFTT is a Contractor activity, which allows ISU to perform patenting and licensing activities for the Laboratory. The ISU Research Foundation (ISURF) and ISU's Office of Intellectual Property and Technology Transfer provides these services on behalf of the Laboratory. Under PFTT, the Laboratory, Contractor, and inventors share in any monetary success derived from DOE funded intellectual

  14. Licensing Technologies | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensing Technologies Licensing Technologies New tack cloth leaves no sticky residue. A license is a means of transferring commercial rights for technologies developed at Y-12 to the private sector. A license authorizes a "licensee" to use a patent, copyright, trademark. A technology license can be the basis of a new product line, or even a new company. The technology transfer process can shortcircuit the lengthy and costly product development cycle, and provide the licensee with a

  15. intellectual property license | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    intellectual property license Intellectual Property License Agreements transfer NETL-owned intellectual property (IP) from the government to the private sector both exclusively and non-exclusively. NETL looks for licensing partners with a plan for technology development and marketing with a high probability for technology commercialization. Licensing partners should also plan to make the benefits of the licensed IP reasonably accessible to the public. Review the list of current NETL technology

  16. Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decision, July 1972 - June 1995

    SciTech Connect (OSTI)

    1996-04-01

    This is the seventh edition of the Nuclear Regulatory Commission (NRC) Staff Practice and Procedure Digest. It contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 1995 interpreting the NRC rules of practice in 10 CFR part 2.

  17. Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective

    SciTech Connect (OSTI)

    Watson, B.A.; Buckley, J.T.; Craig, C.M.

    2006-07-01

    Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in decommissioning planning, conduct of decommissioning operations, volumes of low- level radioactive waste disposed, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated their 10 CFR Part 50 license. Maine Yankee elected to obtain a general license under 10 CFR Part 50 for the ISFSI and reduce the physical site footprint to the ISFSI through a series of license amendments. While the NRC regulations are flexible and allow different approaches to ISFSI licensing there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, public input resulted in the licensee entering into an agreement with a concerned citizen group and resulted in State legislation that significantly lowered the dose limit below the NRC radiological criteria of 25 mrem (0.25 mSv) per year (yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs

  18. License Agreement Moves Promising Technology Into the Marketplace

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    License Agreement Moves Promising Technology Into the Marketplace For information contact: e:mail: Public Affairs Golden, Colo., February 13, 1998 — A new pretreatment process may give cities better options in dealing with a persistent environmental problem: disposing the tons of sludge biosolids generated every day by sewage treatment plants. The pretreatment process was developed at the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL), which recently issued a

  19. Environmental Standard Review Plan for the review of license renewal applications for nuclear power plants

    SciTech Connect (OSTI)

    O'Brien, J.; Kim, T.J.; Reynolds, S.

    1991-08-01

    The Environmental Standard Review Plan for the Review of License Applications for Nuclear Power Plants (ESRP-LR) is to be used by the NRC staff when performing environmental reviews of applications for the renewal of power reactor licenses. The use of the ESRP-LR provides a framework for the staff to determine whether or not environmental issues important to license renewal have been identified and the impacts evaluated and provides acceptance standards to help the reviewers comply with the National Environmental Policy Act.

  20. Regulatory issues for deep borehole plutonium disposition

    SciTech Connect (OSTI)

    Halsey, W.G.

    1995-03-01

    As a result of recent changes throughout the world, a substantial inventory of excess separated plutonium is expected to result from dismantlement of US nuclear weapons. The safe and secure management and eventual disposition of this plutonium, and of a similar inventory in Russia, is a high priority. A variety of options (both interim and permanent) are under consideration to manage this material. The permanent solutions can be categorized into two broad groups: direct disposal and utilization. The deep borehole disposition concept involves placing excess plutonium deep into old stable rock formations with little free water present. Issues of concern include the regulatory, statutory and policy status of such a facility, the availability of sites with desirable characteristics and the technologies required for drilling deep holes, characterizing them, emplacing excess plutonium and sealing the holes. This white paper discusses the regulatory issues. Regulatory issues concerning construction, operation and decommissioning of the surface facility do not appear to be controversial, with existing regulations providing adequate coverage. It is in the areas of siting, licensing and long term environmental protection that current regulations may be inappropriate. This is because many current regulations are by intent or by default specific to waste forms, facilities or missions significantly different from deep borehole disposition of excess weapons usable fissile material. It is expected that custom regulations can be evolved in the context of this mission.

  1. Registration/Licensing Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Registration/Licensing Resources Registration/Licensing Resources Federal agencies and certain state governments are required to acquire alternative fuel vehicles as part of the Energy Policy Act of 1992, though they are also entitled to choose a petroleum reduction path as an alternative to the mandate. Find registration/licensing resources below. Alternative Fuels Data Center: Laws and Incentives by State.

  2. T-564: Vulnerabilities in Citrix Licensing administration components

    Broader source: Energy.gov [DOE]

    The vulnerabilities impact all current versions of the Citrix Licensing Administration Console, formerly known as the License Management Console.

  3. Tritium Laboratory Karlsruhe: administrative and technical framework for isotope laboratory operation

    SciTech Connect (OSTI)

    Welte, S.; Besserer, U.; Osenberg, D.; Wendel, J.

    2015-03-15

    Originally licensed in 1993 the Tritium Laboratory Karlsruhe (TLK) is a unique pilot scale isotope laboratory focused on tritium handling and processing to conduct a variety of scientific experiments and development tasks in view of future fusion power plants. TLK currently operates 15 glove boxes of 125 m{sup 3} total volume in an experimental hall measuring nearly 1500 m{sup 2}. The tritium infrastructure, comprising of the tritium storage system, the tritium transfer system and the isotope separation system, is integrated into TLK as a closed loop system to supply tritium to the experiments. Having a license for handling of up to 40 g of tritium and a closed tritium processing loop, TLK is a unique institute in non-military tritium research. In order to fulfil all requirements regarding the license, a framework of regulations is applied as a basis for the operation of TLK, as well as the setup of new experiments and the design of components. This paper will give an overview on the framework of operation in view of licensing issues, as well as administrative and technical regulations mandatory to legally and reliably operate an isotope laboratory of this scale.

  4. Section 106 Consultation Between Federal Agencies and Indian Tribes Regarding Federal Permits, Licenses, and Assistance Questions and Answers (ACHP, 2008)

    Broader source: Energy.gov [DOE]

    This Advisory Council on Historic Preservation guidance uses a question-and-answer format to explain issues related to Section 106 consultation between federal agencies and Indian tribes related to permits, licenses, and assistance.

  5. Air cleaning issues with contaminated sites

    SciTech Connect (OSTI)

    Bellamy, R.R.

    1997-08-01

    The US Nuclear Regulatory Commission has developed a list of contaminated sites that warrant special USNRC attention because they pose unique or complex decommissioning issues. This list of radiologically contaminated sites is termed the Site Decommissioning Management Plan (SDMP), and was first issued in 1990. A site is placed on the SDMP list if it has; (1) Problems with the viability of the responsible organization (e.g., the licensee for the site is unable or unwilling to pay for the decommissioning); (2) Large amounts of soil contamination or unused settling ponds or burial grounds that may make the waste difficult to dispose of; (3) The long-term presence of contaminated, unused buildings; (4) A previously terminated license; or (5) Contaminated or potential contamination of the ground water from on-site wastes. In deciding whether to add a site to the SDMP list, the NRC also considers the projected length of time for decommissioning and the willingness of the responsible organization to complete the decommissioning in a timely manner. Since the list was established, 9 sites have been removed from the list, and the current SDMP list contains 47 sites in 11 states. The USNRC annually publishes NUREG-1444, {open_quotes}Site Decommissioning Management Plan{close_quotes}, which updates the status of each site. This paper will discuss the philosophical goals of the SDMP, then will concentrate on the regulatory requirements associated with air cleaning issues at the SDMP sites during characterization and remediation. Both effluent and worker protection issues will be discussed. For effluents, the source terms at sites will be characterized, and measurement techniques will be presented. Off-site dose impacts will be included. For worker protection issues, air sampling analyses will be presented in order to show how the workers are adequately protected and their doses measured to satisfy regulatory criteria during decontamination operations. 1 tab.

  6. License renewal demonstration program: NRC observations and lessons learned

    SciTech Connect (OSTI)

    Prato, R.J.; Kuo, P.T.; Newberry, S.F.

    1996-12-01

    This report summarizes the Nuclear Regulatory Commission staff`s observations and lessons learned from the five License Renewal Demonstration Program (LRDP) site visits performed by the staff from March 25, 1996, through August 16, 1996. The LRDP was a Nuclear Energy Institute (NEI) program intended to assess the effectiveness of the guidance provided by NEI 95-10, Revision 0, {open_quotes}Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule,{close_quotes} to implement the requirements of Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), {open_quotes}Requirements for Renewal of Operating Licenses for Nuclear Power Plants.{close_quotes} In general, NEI 95-10 appeared to contain the basic guidance needed for scoping, screening, identifying aging effects, developing aging management programs, and performing time-limited aging analyses. However, inconsistent implementation of this guidance in some areas was an indication that clarification of existing guidance and/or the inclusion-of some new guidance may be needed for applicants to develop a license renewal program that is consistent with the intent of the rule.

  7. NNWSI [Nevada Nuclear Waste Storage Investigation] strategy for repository licensing

    SciTech Connect (OSTI)

    Plodinec, M.J.

    1987-01-16

    The Nevada Nuclear Waste Storage Investigation (NNWSI) has developed a strategy to license a nuclear waste repository in tuff. This strategy, which is currently circulating in draft form within the Department of Energy`s Office of Civilian Radioactive Waste Management, has important implications for DWPF waste form qualification activities, design of the DWPF process, and DWPF operations. In this report, the strategy and its implications for the DWPF are presented. 2 refs.

  8. Public Comments on the proposed 10 CFR Part 51 rule for renewal of nuclear power plant operating licenses and supporting documents: Review of concerns and NRC staff response. Appendices

    SciTech Connect (OSTI)

    1996-05-01

    This volume contains several appendices. Appendix A contains the list of individuals and organizations providing comments at various stages of the rulemaking process. The names of commenters at the public meetings are listed in the order that they spoke at the meeting; those who submitted written comments are listed by docket number. Appendix B contains the summaries of comments made. Each comment summary is identified by a unique comment number. Appendix C presents the concerns and NRC staff responses. Each concern embodies one or more comments on similar or related issues. The associated comment numbers are referenced for each concern. The concerns are organized by topic areas. A three-letter identifier for the topic, followed by a number, is assigned to each concern.

  9. FERC Licensing Processes Matrix | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: FERC Licensing Processes MatrixPermittingRegulatory GuidanceGuideHandbook...

  10. Vermont Waste Transportation Permit and License Information ...

    Open Energy Info (EERE)

    Waste Transportation Permit and License Information Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Vermont...

  11. Recreational Technical Assistance in Hydropower Licensing | Open...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Recreational Technical Assistance in Hydropower LicensingPermittingRegulatory...

  12. Technologies licensed | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    facilities and large sporting venues, as well as for other Department of Energy sites. Sustainable Environment Technologies, LLC (SET), licensed the Access Rate Control System...

  13. Nuclear Power 2010 Program: Combined Construction and Operating...

    Broader source: Energy.gov (indexed) [DOE]

    Power 2010 (NP 2010) Construction and Operating LicenseDesign Certification (COLDC) Demonstration program together with the financial incentives provided by the Energy Policy Act...

  14. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1991

    SciTech Connect (OSTI)

    Not Available

    1992-11-01

    This 4th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to December 31, 1991, interpreting the NRC's Rules of Practice in 10 CFR Part 2.

  15. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1991. Digest 6, Revision 4

    SciTech Connect (OSTI)

    Not Available

    1992-11-01

    This 4th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to December 31, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  16. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest: Commission, Appeal Board and Licensing Board decisions, July 1972--March 1992

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    This 5th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1992, interpreting the NRC's Rules of Practice in 10 CFR Part 2.

  17. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board Decisions, July 1972--June 1971: Revision 2

    SciTech Connect (OSTI)

    Not Available

    1992-05-01

    This 2nd revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to June 30, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  18. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--March 1991: Revision 1

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    This revision of the sixth edition of the NRC Practice and Procedure Digest contains a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  19. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--September 1992: Digest No. 6, Revision No. 7

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This 7th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to September 30, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  20. United States Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decisions, July 1972--June 1992: Digest 6, Revision 6

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This 6th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to June 30, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  1. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest: Commission, Appeal Board and Licensing Board decisions, July 1972--March 1992. Digest 6, Revision 5

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    This 5th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  2. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--September 1991: Digest 6, Revision 3

    SciTech Connect (OSTI)

    Not Available

    1992-08-01

    This 2nd revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to September 30, 1991, interpreting the NRC`s Rules of Pratice in 10 CFR Part 2.

  3. DOE Issues Request for Information for Richland Operations Office Richland Acquisitions – Post Fiscal Year 2018 Contract Acquisition Planning- Occupational Medical Services (OccMed)

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center today issued a Sources Sought/Request for Information (RFI) seeking interested parties with specialized capabilities necessary to successfully perform all or a portion of the elements of scope for the upcoming competitive Environmental Management (EM) procurement for the Hanford Site occupational medical services, hereafter referred to as “Richland Acquisitions – Post Fiscal Year 2018 OccMed Contract” and to further determine whether or not all or a portion of the work can be set-aside for small and disadvantaged businesses.

  4. Identification and Resolution of Safety Issues for the Advanced Integral Type PWR

    SciTech Connect (OSTI)

    Kim, Woong Sik; Jo, Jong Chull; Yune, Young Gill; Kim, Hho Jung

    2004-07-01

    This paper presents the interim results of a study on the identification and resolution of safety issues for the AIPWR licensing. The safety issues discussed in this paper include (1) policy issues for which decision-makings are needed for the procedural requirements of licensing system in the regulatory policy point of view, (2) technical issues for which either development of new requirements or amendment of some existing requirements is needed, or (3) other technical issues for which safety verifications are required. The study covers (a) the assessment of applicability of the issues identified from the previous studies to the case of the AIPWR, (b) identification of safety issues through analysis of the international experiences in the design and licensing of advanced reactors, and technical review of the AIPWR design, and (c) development of the resolutions of safety issues, and application of the resolutions to the amendment of regulatory requirements and the licensing review of the AIPWR. As the results of this study, a total of twenty eight safety issues was identified: fourteen issues from the previous studies, including the establishment of design safety goals; four issues from the foreign practices and experiences, including the risk-informed licensing; and ten issues by the AIPWR design review, including reliability of passive safety systems. Ten issues of them have been already resolved and the succeeding study is under way to resolve the remaining ones. (authors)

  5. Nuclear Safety Design Base for License Application (Technical...

    Office of Scientific and Technical Information (OSTI)

    Nuclear Safety Design Base for License Application Citation Details In-Document Search Title: Nuclear Safety Design Base for License Application You are accessing a document ...

  6. FERC Handbook for Hydroelectric Project Licensing and 5 MW Exemptions...

    Open Energy Info (EERE)

    Handbook for Hydroelectric Project Licensing and 5 MW Exemptions from Licensing Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  7. Sandia Energy - NuMAD License and Disclaimer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power Energy Conversion Efficiency Wind Energy Rotor Innovation Numerical Manufacturing And Design Tool (NuMAD) NuMAD License and Disclaimer NuMAD License and...

  8. Energy Facility Licensing Process Developer's Guide | Open Energy...

    Open Energy Info (EERE)

    Licensing Process Developer's Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Energy Facility Licensing Process Developer's...

  9. Solar/Wind Contractor Licensing | Open Energy Information

    Open Energy Info (EERE)

    Licensing Louisiana InstallerContractor Photovoltaics Solar Water Heat Yes Tennessee Solar Panel Installation Specialty and Solar Thermal-Geothermal Licensing (Tennessee)...

  10. Title 50 CFR Part 221 Prescriptions in FERC Hydropower Licenses...

    Open Energy Info (EERE)

    in FERC Hydropower LicensesLegal Abstract Regulations governing Department of Commerce review of FERC hydropower license conditions under Federal Power Act. Published NA...

  11. ORNL Licenses Rare Earth Magnet Recycling Process to Momentum...

    Office of Environmental Management (EM)

    ORNL Licenses Rare Earth Magnet Recycling Process to Momentum Technologies ORNL Licenses ... Dallas-based Momentum Technologies is focused on extraction of rare earth elements and ...

  12. Exclusive Patent License Agreement between Alliance and company

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    or indirectly by Alliance in the grant of a license to the Licensed Patents, from the United States of America, directly or indirectly without first complying with all...

  13. Non-exclusive patent license agreement between Alliance and company

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    or indirectly by Alliance in the grant of a license to the Licensed Patents, from the United States of America, directly or indirectly without first complying with all...

  14. Property:FERC License Application Date | Open Energy Information

    Open Energy Info (EERE)

    FERC License Application Date Jump to: navigation, search Property Name FERC License Application Date Property Type String Retrieved from "http:en.openei.orgw...

  15. Technology Test Drive: PNNL Offers Exploratory Licenses | Department...

    Office of Environmental Management (EM)

    Technology Test Drive: PNNL Offers Exploratory Licenses Technology Test Drive: PNNL Offers Exploratory Licenses May 10, 2016 - 11:59am Addthis News release from Pacific Northwest ...

  16. NASA Partners License Nanotube Technology for Commercial Use...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NASA Partners License Nanotube Technology for Commercial Use (PR Newswire) External Link: http:www.prnewswire.comnews-releasesnasa-partners-license-nanotube-technolog... By ...

  17. Montana - Land Use License Application | Open Energy Information

    Open Energy Info (EERE)

    Land Use License Application Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Montana - Land Use License Application Author Montana Department of Natural...

  18. U-047: Siemens Automation License Manager Bugs Let Remote Users...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code U-047: Siemens Automation License Manager Bugs Let Remote Users Deny Service or...

  19. DOE Announces Yucca Mountain License Application Schedule | Department...

    Energy Savers [EERE]

    Yucca Mountain License Application Schedule DOE Announces Yucca Mountain License Application Schedule July 19, 2006 - 3:13pm Addthis New Director Ward Sproat Testifies on Revised ...

  20. All Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AlumniLink » All Issues All Issues Bi-monthly publication connecting our alumni with news, information and former colleagues from the Lab. Archive - 2015 September July May March January Archive - 2014 November September June Publications 1663 Actinide Research Quarterly (ARQ) AlumniLink Publications Archive Connections National Security Science VISTAS

  1. Threatened and endangered species evaluation for 75 licensed commercial nuclear power generating plants

    SciTech Connect (OSTI)

    Sackschewsky, M.R.

    1997-03-01

    The Endangered Species Act (ESA) of 1973, as amended, and related implementing regulations of the jurisdictional federal agencies, the U.S. Departments of Commerce and Interior, at 50 CFR Part 17. 1, et seq., require that federal agencies ensure that any action authorized, funded, or carried out under their jurisdiction is not likely to jeopardize the continued existence of any threatened or endangered species or result in the destruction or adverse modification of critical habitats for such species. The issuance and maintenance of a federal license, such as a construction permit or operating license issued by the U.S. Nuclear Regulatory Commission (NRC) for a commercial nuclear power generating facility is a federal action under the jurisdiction of a federal agency, and is therefore subject to the provisions of the ESA. The U.S. Department of the Interior (through the Fish and Wildlife Service), and the U.S. Department of Commerce, share responsibility for administration of the ESA. The National Marine Fisheries Service (NMFS) deals with species that inhabit marine environments and anadromous fish, while the U.S. Fish and Wildlife Service (USFWS) is responsible for terrestrial and freshwater species and migratory birds. A species (or other distinct taxonomic unit such as subspecies, variety, and for vertebrates, distinct population units) may be classified for protection as `endangered` when it is in danger of extinction within the foreseeable future throughout all or a significant portion of its range. A `threatened` classification is provided to those animals and plants likely to become endangered within the foreseeable future throughout all or a significant portion of their ranges. As of February 1997, there were about 1067 species listed under the ESA in the United States. Additionally there were approximately 125 species currently proposed for listing as threatened or endangered, and another 183 species considered to be candidates for formal listing proposals.

  2. Licensed reactor nuclear safety criteria applicable to DOE reactors

    SciTech Connect (OSTI)

    Not Available

    1991-04-01

    The Department of Energy (DOE) Order DOE 5480.6, Safety of Department of Energy-Owned Nuclear Reactors, establishes reactor safety requirements to assure that reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that adequately protects health and safety and is in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. This document identifies nuclear safety criteria applied to NRC (Nuclear Regulatory Commission) licensed reactors. The titles of the chapters and sections of USNRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, Rev. 3, are used as the format for compiling the NRC criteria applied to the various areas of nuclear safety addressed in a safety analysis report for a nuclear reactor. In each section the criteria are compiled in four groups: (1) Code of Federal Regulations, (2) US NRC Regulatory Guides, SRP Branch Technical Positions and Appendices, (3) Codes and Standards, and (4) Supplemental Information. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor.

  3. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    using house July 6, 2012 Description There have been a lot of issues recently with NFS hangs on the gpint machines. The origin of the gpint hanging has been determined to be...

  4. Land Use License | Open Energy Information

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Land Use LicenseLegal Published NA Year Signed or Took Effect 2013 Legal Citation Not...

  5. Hydropower licensing: a case study of Massachusetts' streamlined procedure

    SciTech Connect (OSTI)

    Gardiner, P.

    1980-08-01

    Licensing procedures for hydroelectric projects in Massachusetts are enumerated, reviewed, and evaluated. (LCL)

  6. DEPARTMENT OF ENERGY NONEXCLUSIVE PATENT LICENSE APPLICATION | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy NONEXCLUSIVE PATENT LICENSE APPLICATION DEPARTMENT OF ENERGY NONEXCLUSIVE PATENT LICENSE APPLICATION It is the policy of the U.S. Department of Energy (DOE) to accord licensed on DOE-owned patents applications in appropriate circumstances to applicants with satisfactory plans for development and/or marketing of the invention. NONEXCLUSIVE PATENT LICENSE APPLICATION (16.18 KB) More Documents & Publications DEPARTMENT OF ENERGY EXCLUSIVE OR PARTIALLY EXCLUSIVE PATENT LICENSE

  7. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Open Issues Open Issues The /scratc3 performance degradation after GridRaid upgrade April 7, 2016 The Edison /scratch3 file system was upgraded to Grid Raid from MDRaid during the move to the CRT building (Dec, 2015). This upgrade was recommended by the vendors because it greatly enhances the drive rebuild time and write performance when compared to the traditional MDRaid that was deployed on Edison /scratch3 file system before the move (The /scratch1 and /scratch2 file systems are still in

  8. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Open Issues Open Issues runtime error message: "readControlMsg: System returned error Connection timed out on TCP socket fd" June 30, 2015 Symptom User jobs with sinlge or multiple apruns in a batch script may get this run time error: "readControlMsg: System returned error Connection timed out on TCP socket fd". This problem is intermittent, sometimes resubmit works. This error message started to appear after the Hopper OS upgrade to CLE52UP02 on March 11, 2015. Read the full

  9. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 2012 Resolved: Reports of Hanging Jobs on Hopper March 1, 2012 by Katie Antypas Issue: A number of users have reported intermittent large jobs hanging on Hopper. A job appears to start and then hangs shortly after producing no output. The job stops when the wall clock limit has been reached

  10. Summary and analysis of public comments on NUREG-1317: Regulatory options for nuclear plant license renewal: Final report

    SciTech Connect (OSTI)

    Ligon, D.M.; Seth, S.S.

    1989-03-01

    On August 29, 1988, the US Nuclear Regulatory Commission (NRC) issued an Advance Notice of Proposed Rulemaking on nuclear plant license renewal and solicited public comments on NUREG-1317, ''Regulatory Options for Nuclear Plant License Renewal.'' NUREG-1317 presents a discussion of fifteen topics involving technical, environmental, and procedural issues and poses a set of related questions. As part of its ongoing task for the NRC, The MITRE Corporation has summarized and analyzed the public comments received. Fifty-three written comments were received. Of these, 83 percent were from nuclear industry representatives; the remaining comments represented federal and state agencies, public interest groups, and a private citizen.

  11. Cogeneration : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect (OSTI)

    Deshaye, Joyce; Bloomquist, R.Gordon

    1992-12-01

    This guidebook focuses on cogeneration development. It is one of a series of four guidebooks recently prepared to introduce the energy developer to the federal, state and local agencies that regulate energy facilities in Idaho, Montana, Oregon, and Washington (the Bonneville Power Administration Service Territory). It was prepared specifically to help cogeneration developers obtain the permits, licenses and approvals necessary to construct and operate a cogeneration facility. The regulations, agencies and policies described herein are subject to change. Changes are likely to occur whenever energy or a project becomes a political issue, a state legislature meets, a preexisting popular or valuable land use is thought threatened, elected and appointed officials change, and new directions are imposed on states and local governments by the federal government. Accordingly, cogeneration developers should verify and continuously monitor the status of laws and rules that might affect their plans. Developers are cautioned that the regulations described herein may only be a starting point on the road to obtaining all the necessary permits.

  12. President Issues

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    President Issues Executive Order on Alternative Fuels On December 13, 1996, President Clinton signed Exec- utive Order 13031, which calls on each Federal agency to develop and implement ways to meet the alternative fuel vehicle (AFV) acquisition requirements of the Energy Policy Act (EPAct) of 1992. The executive order requires each agency to submit detailed reports within 60 days of the signing of the order to the Office of Management and Budget detailing its compliance with the EPAct sections

  13. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect (OSTI)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  14. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect (OSTI)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  15. Inspection of the Department`s export licensing process for dual-use and munitions commodities

    SciTech Connect (OSTI)

    Not Available

    1993-08-10

    The purpose of our inspection was to review the Department of Energy`s (Energy) export licensing process for dual-use and military (munitions) commodities subject to nuclear nonproliferation controls. Specifically, we reviewed Energy`s authorities, procedures, and policies pertaining to the export licensing process and examined procedures for safeguarding data transmitted between Energy and other agencies involved in the export licensing process. We also reviewed Energy`s role as a member of the Subgroup on Nuclear Export Coordination. Our review of the sample of 60 export cases did not find evidence to lead us to believe that Energy`s recommendations for these cases were inappropriate or incorrect. We identified, however, problems regarding management systems associated with the export license review process. We found that without documentation supporting export licensing decisions by the Export Control Operations Division (ECOD), we could not determine whether ECOD analysts considered all required criteria in their review of export cases referred to Energy. For example, we found that the ECOD did not retain records documenting the bases for its advice, recommendations, or decisions regarding its reviews of export license cases or revisions to lists of controlled commodities and, therefore, was not in compliance with certain provisions of the Export Administration Act, as amended, and Energy records management directives. Additionally, we found that the degree of compliance by Energy with the export licensing review criteria contained in the Export Administration Regulations and the Nuclear Non-Proliferation Act of 1978 could not be determined because ECOD did not retain records documenting the bases for its advice and recommendations on export cases.

  16. Kirkland gets license in hot Philippines area

    SciTech Connect (OSTI)

    Kirkland, A.S.

    1992-08-03

    This paper reports that Kirkland As, Oslo, has received a geophysical survey and exploration contract (GSEC) in a sizzling exploration and development theater off the Philippines. The license covers about 6,000 sq miles of undisputed waters, with depths mostly less than 300 ft, and lies in the Reed Bank area off Northwest Palawan Island, where several major oil and gas strikes have been made recently. Kirkland has 1 year in which to carry out its seismic work commitment. The terms of the GSEC then give an option to drill one well in a 6 month period. Once the results have been analyzed, the company can either drill another well or enter into a service contract for the license. Kirkland has a 65% share in the license, with the remainder split between Philippine companies Philodrill Corp., Beguet Mining Corp. subsidiary Petrofields, and Seafront Resources Corp. The Philippines is one of Kirkland's main areas of activity, the Kirkland Commercial Manager Ralph Baxter.

  17. Operational Issues at the Environmental Restoration Disposal...

    Office of Environmental Management (EM)

    of Engineering and Technology (EM-20) 17 June 2007 ... with real-time remote output. Similar systems are commonly used in ... 1-21. Refereed Conference Papers Benson, C. ...

  18. Summary - Operational Issues at the Environmental Restoration...

    Office of Environmental Management (EM)

    Restoration Disposal Facility(ERDF) at Hanford Why DOE-EM Did This Review The ERDF is a large- scale disposal facility authorized to receive waste from Hanford cleanup...

  19. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 2011 "Unable to open kgni version file /sys/class/gemini/kgni0/version" error April 13, 2011 by Helen He Symptom: Dynamic executables built with compiler wrappers running directly on the external login nodes are getting the following error message: Read the full post Resolved -- Default version not shown in "module avail module_name" command April 13, 2011 by Helen He Symptom: The default software version is not shown when "module avail module_name" is issued.

  20. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391): Supplement No. 19

    SciTech Connect (OSTI)

    1995-11-01

    Supplement No. 19 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation with (1) additional information submitted by the applicant since Supplement No. 18 was issued, and (2) matters that the staff had under review when Supplement No. 18 was issued.

  1. Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 12

    SciTech Connect (OSTI)

    Tam, P.S.

    1993-10-01

    Supplement No. 12 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation of (1) additional information submitted by the applicant since Supplement No. 11 was issued, and (2) matters that the staff had under review when Supplement No. 11 was issued.

  2. Total System Performance Assessment-License Application Methods and Approach

    SciTech Connect (OSTI)

    J. McNeish

    2002-09-13

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issue (KTI) agreements, the ''Yucca Mountain Review Plan'' (CNWRA 2002 [158449]), and 10 CFR Part 63. This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are utilized in this document.

  3. Total System Performance Assessment - License Application Methods and Approach

    SciTech Connect (OSTI)

    J. McNeish

    2003-12-08

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

  4. Advanced Reactor Licensing: Experience with Digital I&C Technology in Evolutionary Plants

    SciTech Connect (OSTI)

    Wood, RT

    2004-09-27

    This report presents the findings from a study of experience with digital instrumentation and controls (I&C) technology in evolutionary nuclear power plants. In particular, this study evaluated regulatory approaches employed by the international nuclear power community for licensing advanced l&C systems and identified lessons learned. The report (1) gives an overview of the modern l&C technologies employed at numerous evolutionary nuclear power plants, (2) identifies performance experience derived from those applications, (3) discusses regulatory processes employed and issues that have arisen, (4) captures lessons learned from performance and regulatory experience, (5) suggests anticipated issues that may arise from international near-term deployment of reactor concepts, and (6) offers conclusions and recommendations for potential activities to support advanced reactor licensing in the United States.

  5. NASA Partners License Nanotube Technology for Commercial Use (PR Newswire)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | Jefferson Lab NASA Partners License Nanotube Technology for Commercial Use (PR Newswire) External Link: http://www.prnewswire.com/news-releases/nasa-partners-license-nanotube-technolog... By jlab_admin on Tue, 2012-05-0

  6. Title 18 CFR 5 Integrated License Application Process | Open...

    Open Energy Info (EERE)

    5 Integrated License Application Process Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 CFR 5 Integrated License...

  7. ARS 41-1072 Licensing Time Frames | Open Energy Information

    Open Energy Info (EERE)

    1-1072 Licensing Time Frames Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: ARS 41-1072 Licensing Time FramesLegal Abstract...

  8. CCC Federal License and Permit List | Open Energy Information

    Open Energy Info (EERE)

    CCC Federal License and Permit List Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: CCC Federal License and Permit ListLegal Abstract...

  9. Known Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NNSA's national security missions | National Nuclear Security Administration | (NNSA) Klotz visits Y-12 to see progress on new projects and ongoing work on NNSA's national security missions Tuesday, June 7, 2016 - 11:48am Last week, NNSA Administrator Lt. Gen. Frank Klotz (Ret.) visited the Y-12 National Security Complex to check on the status of ongoing projects like the Uranium Processing Facility as well as the site's continuing uranium operations. He also met with the Region 2 volunteers

  10. Review of safety guidelines and licensing procedures applicable in Italy with regard to fusion machines

    SciTech Connect (OSTI)

    Sgalambro, G.

    1993-06-01

    A consistent set of general safety criteria has been set up in Italy dealing with fusion machines, considering also the most recent recommendations issued by ICRP. The paper gives a short discussion of the more safety relevant aspects in the design of fusion machines starting from the consideration of the applicable dose limits. The procedure for the licensing of fusion machines is presented in the second part of the paper.

  11. Professional Engineer Licenses are Symbol of Achievement for Employees |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Professional Engineer Licenses are Symbol of Achievement for Employees Professional Engineer Licenses are Symbol of Achievement for Employees July 14, 2016 - 12:10pm Addthis ORP employees Kelly Ebert, left, and Anne McCartney, recently earned their professional engineer licenses from the state of California. ORP employees Kelly Ebert, left, and Anne McCartney, recently earned their professional engineer licenses from the state of California. RICHLAND, Wash. - Two EM

  12. Nuclear Regulatory Commission Regulatory and Licensing Matters | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a

  13. Laboratory Licenses Hydrogen Sensor Technology - News Releases | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Licenses Hydrogen Sensor Technology Nuclear Filter Technology Awarded Licenses for Fiber Optic Hydrogen Sensor February 23, 2006 Golden, Colo. - The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) today announced that Nuclear Filter Technology (NucFil) has been awarded licenses to manufacture Fiber Optic Hydrogen Sensors. The licenses, together with a Cooperative Research and Development Agreement (CRADA), allow NucFil to work with scientists and engineers at

  14. DEPARTMENT OF ENERGY EXCLUSIVE OR PARTIALLY EXCLUSIVE PATENT LICENSE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    APPLICATION | Department of Energy EXCLUSIVE OR PARTIALLY EXCLUSIVE PATENT LICENSE APPLICATION DEPARTMENT OF ENERGY EXCLUSIVE OR PARTIALLY EXCLUSIVE PATENT LICENSE APPLICATION It is the policy of the U.S. Department of Energy (DOE) to accord licenses on DOE-owned patents and patent applications in appropriate circumstances to applicants with satisfactory plans for development and/or marketing of the invention. EXCLUSIVE OR PARTIALLY EXCLUSIVE PATENT LICENSE APPLICATION (21.33 KB) More

  15. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Energy Savers [EERE]

    ... Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and ...

  16. Human Factors Aspects of Operating Small Reactors

    SciTech Connect (OSTI)

    OHara, J.M.; Higgins, J.; Deem, R.; Xing, J.; DAgostino, A.

    2010-11-07

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. They are considering small modular reactors (SMRs) as one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants, and so may require a concept of operations (ConOps) that also is different. The U.S. Nuclear Regulatory Commission (NRC) has begun examining the human factors engineering- (HFE) and ConOps- aspects of SMRs; if needed, they will formulate guidance to support SMR licensing reviews. We developed a ConOps model, consisting of the following dimensions: Plant mission; roles and responsibilities of all agents; staffing, qualifications, and training; management of normal operations; management of off-normal conditions and emergencies; and, management of maintenance and modifications. We are reviewing information on SMR design to obtain data about each of these dimensions, and have identified several preliminary issues. In addition, we are obtaining operations-related information from other types of multi-module systems, such as refineries, to identify lessons learned from their experience. Here, we describe the project's methodology and our preliminary findings.

  17. The Role of the Engineered Barrier System in Safety Cases for Geological Radioactive Waste Repoitories: An NEA Initiaive in Co-Operations with the EC, Process Issues and Modeling

    SciTech Connect (OSTI)

    D.G. Bennett; A.J. Hooper; S. Voinis; H. Umeki; A.V. Luik; J. Alonso

    2006-02-07

    The Integration Group for the Safety Case (IGSC) of the Nuclear Energy Agency (NEA) Radioactive Waste Management Committee in co-operation with the European Commission (EC) is conducting a project to develop a greater understanding of how to achieve the necessary integration for successful design, construction, testing, modeling, and assessment of engineered barrier systems. The project also seeks to clarify the role that the EBS plays in assuring the overall safety of a repository. A framework for the EBS Project is provided by a series of workshops that allow discussion of the wide range of activities necessary for the design, assessment and optimization of the EBS, and the integration of this information into the safety case. The topics of this series of workshops have been planned so that the EBS project will work progressively through the main aspects comprising one cycle of the design and optimization process. This paper seeks to communicate key results from the EBS project to a wider audience. The paper focuses on two topics discussed at the workshops: process issues and the role of modeling.

  18. Sensor network based vehicle classification and license plate identification system

    SciTech Connect (OSTI)

    Frigo, Janette Rose; Brennan, Sean M; Rosten, Edward J; Raby, Eric Y; Kulathumani, Vinod K

    2009-01-01

    Typically, for energy efficiency and scalability purposes, sensor networks have been used in the context of environmental and traffic monitoring applications in which operations at the sensor level are not computationally intensive. But increasingly, sensor network applications require data and compute intensive sensors such video cameras and microphones. In this paper, we describe the design and implementation of two such systems: a vehicle classifier based on acoustic signals and a license plate identification system using a camera. The systems are implemented in an energy-efficient manner to the extent possible using commercially available hardware, the Mica motes and the Stargate platform. Our experience in designing these systems leads us to consider an alternate more flexible, modular, low-power mote architecture that uses a combination of FPGAs, specialized embedded processing units and sensor data acquisition systems.

  19. NRC antitrust licensing actions, 1978--1996

    SciTech Connect (OSTI)

    Mayer, S.J.; Simpson, J.J.

    1997-09-01

    NUREG-0447, Antitrust Review of Nuclear Power Plants, was published in May 1978 and includes a compilation and discussion of U.S. Nuclear Regulatory Commission (NRC) proceedings and activity involving the NRC`s competitive review program through February 1978, NUREG-0447 is an update of an earlier discussion of the NRC`s antitrust review of nuclear power plants, NR-AIG-001, The US Nuclear Regulatory Commission`s Antitrust Review of Nuclear Power Plants: The Conditioning of Licenses, which reviewed the Commission`s antitrust review function from its inception in December 1970 through April 1976. This report summarizes the support provided to NRC staff in updating the compilation of the NRC`s antitrust licensing review activities for commercial nuclear power plants that have occurred since February 1978. 4 refs., 4 tabs.

  20. TEAM 1 Drivers License.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    I Core Status: new users must complete 2 training sessions and pass a sample exchange exam to work independently during Core sessions (regular work hours). Flex Status: core users must complete 5 Core sessions and pass a driving test to work during Flex sessions (evening and weekend hours). All TEAM I scheduling must be coordinated through Peter Ercius at PErcius@lbl.gov. You may only be assigned two sessions per month. CORE LICENSE TEST Safety  Understand emergency shutdown procedure 

  1. Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository

    SciTech Connect (OSTI)

    Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

    2002-02-26

    If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required

  2. Testing, licensing, and code requirements for seismic isolation systems (for nuclear power plants)

    SciTech Connect (OSTI)

    Seidensticker, R.W.

    1987-01-01

    The use of seismic isolation as an earthquake hazard mitigation strategy for nuclear reactor power plants is rapidly receiving interest throughout the world. Seismic isolation has already been used on at least two French PWR plants, was to have been used for plants to be built in Iran, and is under serious consideration for advanced LMR plants (in the US, UK, France, and Japan). In addition, there is a growing use of seismic isolation throughout the world for other critical facilities such as hospitals, emergency facilities, buildings with very high-cost equipment (e.g., computers) and as a strategy to reduce loss of life and expensive equipment in earthquakes. Such a design approach is in complete contrast to the conventional seismic design strategy in which the structure and components are provided with sufficient strength and ductility to resist the earthquake forces and to prevent structural collapses or failure. The use of seismic isolation for nuclear plants can, therefore, be expected to be a significant licensing issue. For isolation, the licensing process must shift away in large measure from the superstructure and concentrate on the behavior of the seismic isolation system. This paper is not intended to promote the advantages of seismic isolation system, but to explore in some detail those technical issues which must be satisfactorily addressed to achieve full licensability of the use of seismic isolation as a viable, attractive and economical alternative to current traditional design approaches. Special problems and topics associated with testing and codes and standards development are addressed. A positive program for approach or strategy to secure licensing is presented.

  3. Department of Energy Files Motion to Withdraw Yucca Mountain License

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application | Department of Energy Files Motion to Withdraw Yucca Mountain License Application Department of Energy Files Motion to Withdraw Yucca Mountain License Application March 3, 2010 - 12:00am Addthis WASHINGTON, D.C. - The U.S. Department of Energy today filed a motion with the Nuclear Regulatory Commission to withdraw the license application for a high-level nuclear waste repository at Yucca Mountain with prejudice. "President Obama is fully committed to ensuring that the

  4. Photovoltaics at DOE's National Renewable Energy Laboratory License |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Photovoltaics at DOE's National Renewable Energy Laboratory License Photovoltaics at DOE's National Renewable Energy Laboratory License Document describes a sample land use agreement surrounding the National Renewable Energy Laboratory Science and Technology Facility roof-top photovoltaic (PV) power purchase agreement (PPA). Download the photovoltaics at DOE's National Renewable Energy Laboratory license document. (256.08 KB) More Documents & Publications USA RS

  5. DOE Marks Milestone in Submitting Yucca Mountain License Application |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Milestone in Submitting Yucca Mountain License Application DOE Marks Milestone in Submitting Yucca Mountain License Application June 3, 2008 - 12:51pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced submittal of a license application (LA) to the U.S. Nuclear Regulatory Commission (NRC) seeking authorization to construct America's first repository for spent nuclear fuel and high-level radioactive waste at Yucca Mountain, Nevada. The 8,600 page

  6. Department of Energy Issues Draft Request for Proposals for Argonne...

    Energy Savers [EERE]

    ... Seeking a Contractor to Manage and Operate its Ames Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory

  7. NRC Licensing Strategy Development for the NGNP

    SciTech Connect (OSTI)

    Mark R. Holbrook; Trevor Cook

    2008-09-01

    The Next Generation Nuclear Plant (NGNP) project will provide the basis for commercialization of a new generation of advanced nuclear plants that utilize hightemperature gas-cooled reactor (HTGR) technology. The inherently safe HTGR design characteristics can be utilized to supply high-temperature process heat, co-generated electricity, and/or hydrogen for a number of industrial applications (e.g., petrochemical processes). Completion of the NGNP will result in a facility that demonstrates the safety and economics of the design, the commercial industrial potential of the technology, and the viability of the licensing strategy.

  8. 18 CFR 5: Integrated License Application Process | Open Energy...

    Open Energy Info (EERE)

    5: Integrated License Application Process Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: 18 CFR 5:...

  9. FERC Hydropower Licensing and Endangered Species - A Guide for...

    Open Energy Info (EERE)

    FERC Hydropower Licensing and Endangered Species - A Guide for Applicants, Contractors, and Staff Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  10. Hydropower Licensing and Endangered Species A Guide for Applicants...

    Open Energy Info (EERE)

    Hydropower Licensing and Endangered Species A Guide for Applicants, Contractors, and Staff Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Hydropower...

  11. FERC Handbook for Hydroelectric Filings other than Licenses and...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: FERC Handbook for Hydroelectric Filings other than Licenses and...

  12. FERC Hydroelectric Project Handbook for Filings other than Licenses...

    Open Energy Info (EERE)

    Hydroelectric Project Handbook for Filings other than Licenses and Exemptions Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  13. Guidelines to Consider for Participating in the Alternative Licensing...

    Open Energy Info (EERE)

    to Consider for Participating in the Alternative Licensing Process Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Guide...

  14. FERC Hydropower Licensing Guidelines webpage | Open Energy Information

    Open Energy Info (EERE)

    Guidelines webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: FERC Hydropower Licensing Guidelines webpage Abstract This webpage provides...

  15. DOE Grant Recipients Technologies Available for Licensing - Energy...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Patent Search Success Stories News Events DOE Grant Recipients Technologies Available for Licensing In addition to National Laboratory research, the Department of Energy (DOE)...

  16. Property:FERC License Issuance Date | Open Energy Information

    Open Energy Info (EERE)

    Issuance Date Jump to: navigation, search Property Name FERC License Issuance Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense...

  17. Vermont Permit and License Information: NPDES Stormwater General...

    Open Energy Info (EERE)

    General Permits for Construction SitesLegal Abstract Permit and licensing information for Clean Water Act 304 National Pollution Discharge Elimination System (NPDES) Permits for...

  18. Title 18 CFR 4 Licenses, Permits, Exemptions, and Determination...

    Open Energy Info (EERE)

    for licenses, permits, exemptions, and determination of project costs associated with conservation of power and water resources. Published NA Year Signed or Took Effect 1979...

  19. NREL: Technology Transfer - New Energy License Encourages Investment...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New Energy License Encourages Investment in Green Technologies August 5, 2015 The Energy Department's National Renewable Energy Laboratory (NREL) has developed a new technology ...

  20. UDOT - Statewide Utility License Agreements | Open Energy Information

    Open Energy Info (EERE)

    UDOT, 2013 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for UDOT - Statewide Utility License Agreements Citation UDOT. UDOT - Statewide...

  1. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3070)

    SciTech Connect (OSTI)

    Zeitoun, A.

    1994-08-01

    This two-volume Final Environmental Impact Statement (FEIS) was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA). Volume 1 contains the assessment of the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana, by Louisiana Energy Services, LP. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are construction, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning (D&D)- of the site. Issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment. The FEIS supports issuance of a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility.

  2. No Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Problems » No Open Issues No Open Issues There are currently no open issues with Euclid. Subscribe via RSS Subscribe Browse by Date January 2016 Last edited: 2011-03-15 10:01:46

  3. Seismic Analysis Issues in Design Certification Applications for New Reactors

    SciTech Connect (OSTI)

    Miranda, M.; Morante, R.; Xu, J.

    2011-07-17

    The licensing framework established by the U.S. Nuclear Regulatory Commission under Title 10 of the Code of Federal Regulations (10 CFR) Part 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants,” provides requirements for standard design certifications (DCs) and combined license (COL) applications. The intent of this process is the early reso- lution of safety issues at the DC application stage. Subsequent COL applications may incorporate a DC by reference. Thus, the COL review will not reconsider safety issues resolved during the DC process. However, a COL application that incorporates a DC by reference must demonstrate that relevant site-specific de- sign parameters are within the bounds postulated by the DC, and any departures from the DC need to be justified. This paper provides an overview of several seismic analysis issues encountered during a review of recent DC applications under the 10 CFR Part 52 process, in which the authors have participated as part of the safety review effort.

  4. Project Analysis Standard Operating Procedure

    Office of Environmental Management (EM)

    Standard Operating Procedure (EPASOP) Issued by Office of Acquisition and Project Management MA-63 March 12, 2014 DEPARTMENT OF ENERGY Office of Acquisition and Project...

  5. Web-based training related to NRC staff review of dose modeling aspects of license termination and decommissioning plans.

    SciTech Connect (OSTI)

    LePoire, D.; Arnish, J.; Cheng, J. J.; Kamboj, S.; Richmond, P.; Chen, S. Y.; Barr, C.; McKenney, C.; Environmental Science Division; NRC

    2007-01-01

    NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course is being developed in 2006 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The training course consists of the core and advanced modules tailored to specific NRC job functions. Topics for individual modules include identifying the characteristics of simple and complex sites, identifying when outside expertise or consultation is needed, demonstrating how to conduct acceptance and technical reviews of dose modeling, and providing details regarding the level of justification needed for realistic scenarios for both dose modeling and derivation of DCGLs. Various methods of applying probabilistic uncertainty analysis to demonstrate compliance with dose-based requirements are presented. These approaches include: (1) modeling the pathways of radiological exposure and estimating doses to receptors from a combination of contaminated media and radionuclides, and (2) using probabilistic analysis to determine an appropriate set of input parameters to develop derived concentration guideline limits or DCGLs (DCGLs are media- and nuclide-specific concentration limits that will meet dose-based, license termination rule criteria found in 10 CFR Part 20, Subpart E). Calculation of operational (field) DCGL's from media- and nuclide-specific DCGLs and use of operational DCGLs in conducting

  6. Web-based training related to NRC staff review of dose modeling aspects of license termination and decommissioning plans

    SciTech Connect (OSTI)

    LePoire, D.; Arnish, J.; Cheng, J.J.; Kamboj, S.; Richmond, P.; Chen, S.Y.; Barr, C.; McKenney, C.

    2007-07-01

    NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course is being developed in 2006 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The training course consists of the core and advanced modules tailored to specific NRC job functions. Topics for individual modules include identifying the characteristics of simple and complex sites, identifying when outside expertise or consultation is needed, demonstrating how to conduct acceptance and technical reviews of dose modeling, and providing details regarding the level of justification needed for realistic scenarios for both dose modeling and derivation of DCGLs. Various methods of applying probabilistic uncertainty analysis to demonstrate compliance with dose-based requirements are presented. These approaches include 1) modeling the pathways of radiological exposure and estimating doses to receptors from a combination of contaminated media and radionuclides, and 2) using probabilistic analysis to determine an appropriate set of input parameters to develop derived concentration guideline limits or DCGLs (DCGLs are media- and nuclide-specific concentration limits that will meet dose-based, license termination rule criteria found in 10 CFR Part 20, Subpart E). Calculation of operational (field) DCGL's from media- and nuclide-specific DCGLs and use of operational DCGLs in conducting

  7. Issues evaluation process at Rocky Flats Plant

    SciTech Connect (OSTI)

    Smith, L.C.

    1992-04-16

    This report describes the issues evaluation process for Rocky Flats Plant as established in July 1990. The issues evaluation process was initiated February 27, 1990 with a Charter and Process Overview for short-term implementation. The purpose of the process was to determine the projects required for completion before the Phased Resumption of Plutonium Operations. To determine which projects were required, the issues evaluation process and emphasized risk mitigation, based on a ranking system. The purpose of this report is to document the early design of the issues evaluation process to record the methodologies used that continue as the basis for the ongoing Issues Management Program at Rocky Flats Plant.

  8. LICENSE HISTORY MO.8 Petrolite Corporation, St. Louis

    Office of Legacy Management (LM)

    LICENSE HISTORY MO.8 Petrolite Corporation, St. Louis 07,16/93 l See attached Document and Pile Sumnary for MO.8 l License History: l 24-10452-01, 30-051175, 08/13/79. Loose H-3, I-131, P-32. l 24-10452-1, 10/30/64. K66 R. R. Annand et al Multiple. . 70-621, 12-15-61, SNM license for 0.5 kg. of U-235, 93% enriched as a fuel loading and star-up ~curce for Webster Groves, Missouri reactor. l Discussion: Historical documents for this site are limited. The only information available on work done

  9. Welcome to this Issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Welcome National Security Science Latest Issue:April 2016 past issues All Issues » submit Welcome to this Issue Los Alamos National Laboratory has been at the forefront of high explosives research since the Manhattan Project, says Bob Webster, Principal Associate Director, Weapons Programs. March 22, 2016 Welcome to this Issue Bob Webster (Photo: Los Alamos) Contact Managing Editor Clay Dillingham Email Here's to another year of noteworthy accomplishments and continued excellence in 2016.

  10. Past Issues | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Inquiry Magazine Past Issues To view past issues of Inquiry magazine, click on the links below. Inquiry 2015, Issue 1 Inquiry 2014, Issue 2 Inquiry 2014, Issue 1 Image Inquiry 2013, Issue 2 Image Inquiry 2013, Issue 1 Image Inquiry 2012. Issue 2 Image Inquiry 2012, Issue 1 Image Inquiry 2011, Issue 2 Image Inquiry 2011, Issue 1 Image Inquiry 2010, Issue 2 Image Inquiry 2010, Issue 1 Inq10-1cover.jpg

  11. United States Nuclear Regulatory Commission staff practice and procedure digest. Commission, Appeal Board and Licensing Board decisions, July 1972-September 1985. Digest No. 4, Revision No. 1

    SciTech Connect (OSTI)

    Not Available

    1986-04-01

    This Revision 1 of the fourth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to September 30, 1985 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 1 replaces earlier editions and supplements and includes appropriate changes reflecting the admendments to the Rules of Practice effective through September 20, 1985.

  12. United States Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board decisions, July 1972--December 1990

    SciTech Connect (OSTI)

    Not Available

    1991-12-01

    This sixth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to December 31, 1990 interpreting the NRC`s Rules of Practice in 10 CFR Part 2. This sixth edition replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through December 31, 1990.

  13. ENERGY COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE

    Office of Legacy Management (LM)

    ... MATERIAL LICENSE . Pursuant to the Atomic Energy Act of 1954, and Title 10, Code of ... specified in Section 183 of the Atotic Energy Act of 1954 and is subject to all ...

  14. 33 USC 1341 Permits and Licenses - Certification | Open Energy...

    Open Energy Info (EERE)

    1341 Permits and Licenses - CertificationLegal Published NA Year Signed or Took Effect 1977 Legal Citation 33 USC 1341 (1977) DOI Not Provided Check for DOI availability: http:...

  15. ORNL Licenses Rare Earth Magnet Recycling Process to Momentum Technologies

    Broader source: Energy.gov [DOE]

    The Department of Energy’s Oak Ridge National Laboratory and Momentum Technologies have signed a non-exclusive licensing agreement for an ORNL process designed to recover rare earth magnets from used computer hard drives.

  16. 16 USC 799 License duration, conditions, revocation, alteration...

    Open Energy Info (EERE)

    9 License duration, conditions, revocation, alteration, or surrender Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: 16 USC 799...

  17. US Fish and Wildlife Service Hydropower Licensing webpage | Open...

    Open Energy Info (EERE)

    US Fish and Wildlife Service Hydropower Licensing webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: US Fish and Wildlife Service Hydropower...

  18. Title 16 USC 2705 Simplified and Expeditious Licensing Procedures...

    Open Energy Info (EERE)

    2705 Simplified and Expeditious Licensing Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 USC 2705 Simplified...

  19. Microsoft Word - Webdam_online_endusers_licensing_agreement_final...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P D c LAWRENCE BERKELEY NATIONAL LAB END USER LICENSE AGREEMENT FOR SELECTED IMAGES FOR NON-COMMERCIAL USE Image title and description selected from http:photos.lbl.gov...

  20. NREL Model Licensed to Improve Accuracy of Battery Simulations - News

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Releases | NREL Model Licensed to Improve Accuracy of Battery Simulations January 14, 2014 The Energy Department's National Renewable Energy Laboratory (NREL) has licensed its Equivalent Circuit Battery Model to software developer ThermoAnalytics for use in its recently updated RadTherm software package. The model is a part of the Battery Module within RadTherm, which is used by engineers to simulate the performance of battery cells and optimize multi-cell pack designs. Before the addition

  1. First License for a CMI Invention | Critical Materials Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    First License for a CMI Invention diagram of membrane solvent extraction system developed by CMI researchers Diagram of membrane solvent extraction system developed by CMI researchers at ORNL and INL. The first license for a CMI invention was granted for a recycling process developed by CMI researchers at Oak Ridge National Laboratory and Idaho National Laboratory. They have applied for a patent for "Membrane Solvent Extraction for Rare Earth Separations." Official news release from

  2. DOE Signs Advanced Enrichment Technology License and Facility Lease |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Advanced Enrichment Technology License and Facility Lease DOE Signs Advanced Enrichment Technology License and Facility Lease December 8, 2006 - 9:34am Addthis Announces Agreements with USEC Enabling Deployment of Advanced Domestic Technology for Uranium Enrichment WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman today announced the signing of a lease agreement with the United States Enrichment Corporation, Inc. (USEC) for their use of the Department's gas

  3. Lab grants Decision Sciences Corporation exclusive commercial license for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    muon tomography Muon tomography license Lab grants Decision Sciences Corporation exclusive commercial license for muon tomography Muon tomography uses naturally occurring cosmic-ray muons to detect and identify concealed nuclear threat materials based on their atomic number and density. October 7, 2008 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from

  4. Front Burner- Issue 15

    Broader source: Energy.gov [DOE]

    The Cybersecurity Front Burner Issue No. 15 addresses the DOE eSCRM Program and Secure Online Shopping.

  5. Front Burner- Issue 14

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Cybersecurity Front Burner Issue No. 14 highlights the 2013 National Cybersecurity Awareness Month (NCSAM) Campaign and Phishing Scams.

  6. Connections: All Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Connections Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: September 1, 2016 all issues All Issues » submit Community Connections Monthly news and opportunities for the Laboratory's neighbors and friends, with a primary focus on economic development, education and community giving. All Issues Connections Newsletter September 2016 September 2016 Great opportunity for Native American-owned businesses; 900 backpacks donated to local

  7. Enforcement Guidance Supplement 00-03: Specific Issues on Applicabilit...

    Office of Environmental Management (EM)

    00-03: Specific Issues on Applicability of 10 CFR 830 Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of 10 CFR 830 Section 1.3 of the Operational Procedure...

  8. The role of non-destructive assay in support of the exemption of solid waste from nuclear licensed sites

    SciTech Connect (OSTI)

    Fisher, Alan; Adsley, Ian; Green, Tommy

    2007-07-01

    Available in abstract form only. Full text of publication follows: Nuclear Site License Holders within the United Kingdom are increasingly re-examining the options available for disposal of solid waste produced during routine operations and decommissioning activities. The incentives to do so include: 'Compliance with the requirement to minimise radioactive waste, as stipulated in Disposal Authorisations issued by the Environment Agency' Reducing the burden on the UK Low Level Waste Repository (LLWR)' Achieving cost savings on waste management, by avoiding expensive conditioning, transport and disposal costs for certain wastes. Wastes may be exempted from regulation under the Radioactive Substances Act, 1993 (RSA 93) provided they comply with the conditions laid out in the relevant Exemption Orders. In effect, they may be legally disposed as if they were non-radioactive waste. A national Code of Practice on Clearance and Exemption Principles, Processes and Practices was introduced in 2005 to clarify the requirements of these Exemption Orders and provide guidance on their practical application. In order to demonstrate compliance with these Exemption Orders, it is essential to have good knowledge of the items' history and their potential for contamination. Monitoring is frequently used as definitive evidence that the radioactivity content of waste items does not exceed limits proscribed in the relevant Exemption Orders. The practicalities of monitoring require careful consideration in order to achieve meaningful results and be capable of achieving the low specific activity limits quoted in the Exemption Orders. The Cross Industry Assay Working Group is a national collection of non-destructive assay specialists from a range of companies, which meets regularly to discuss challenges relating to the assay of all categories of waste. In this paper, the Group presents examples of how NDA techniques are being used to support the exemption of waste items. (authors)

  9. PRECLOSURE CONSEQUENCE ANALYSES FOR LICENSE APPLICATION

    SciTech Connect (OSTI)

    S. Tsai

    2005-01-12

    Radiological consequence analyses are performed for potential releases from normal operations in surface and subsurface facilities and from Category 1 and Category 2 event sequences during the preclosure period. Surface releases from normal repository operations are primarily from radionuclides released from opening a transportation cask during dry transfer operations of spent nuclear fuel (SNF) in Dry Transfer Facility 1 (DTF 1), Dry Transfer Facility 2 (DTF 2), the Canister Handling facility (CHF), or the Fuel Handling Facility (FHF). Subsurface releases from normal repository operations are from resuspension of waste package surface contamination and neutron activation of ventilated air and silica dust from host rock in the emplacement drifts. The purpose of this calculation is to demonstrate that the preclosure performance objectives, specified in 10 CFR 63.111(a) and 10 CFR 63.111(b), have been met for the proposed design and operations in the geologic repository operations area. Preclosure performance objectives are discussed in Section 6.2.3 and are summarized in Tables 1 and 2.

  10. Facility Operations and User Support | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Facility Operations and User Support This sub-program provides both necessary physical facility and operational support for reliable, cross-lab production computing and storage environments as well as a suite of user services for effective use of ASC tri-lab computing resources. The scope of the facility operations includes planning, integration and deployment, continuing product support, software license and maintenance fees, procurement of operational equipment and

  11. Reverse licensing: international technology transfer to the United States

    SciTech Connect (OSTI)

    Sharokhi, M.

    1985-01-01

    This dissertation, theoretically and empirically, focuses on US licensees as the recipient of foreign technology, and investigates characteristics of licensees, licenses, and licensed technology. The viability of reverse licensing, as an international growth strategy, is evaluated from the standpoint of two groups of firms. The first consists of thousands of small and medium sized US manufacturing firms, with few products and virtually no R and D expenditures. Without R and D, new technology and stiff international competition, they are forced into bankruptcies despite their extreme importance in the economy (48% of private workforce, 42% of sales, and 38% of GNP). The second group consists of thousands of small and medium sized firms overseas, with a relatively good supply of technology (i.e., patents) and anxious to exploit the US market but lack required resources for FDI. Technology licensing is, perhaps, the only viable option available to them. Reverse licensing provides both groups with a mechanism for their growth, survival, and prosperity. Many US firms have utilized this strategy for many years (i.e, 118 in Ohio) for tapping foreign sources including Soviet bloc technology.

  12. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Office of Environmental Management (EM)

    Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm ...

  13. Office for Analysis and Evaluation of Operational Data. 1992 annual report: Nonreactors: Volume 7, No. 2

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC`s Operations Center. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued for 1981--1992.

  14. Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors

    SciTech Connect (OSTI)

    1997-12-01

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC`s Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission in 1996.

  15. Office for Analysis and Evaluation of Operational Data 1990 annual report

    SciTech Connect (OSTI)

    1991-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1990. The report is published in two separate parts. This document NUREG-1272, Vol. 5, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol.5, No. 2, covers nonreactors and presents a review of the events and concerns during 1990 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. Each volume contains a list of the AEOD reports issued for 1980 through 1990. 9 figs., 8 tabs.

  16. Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

    SciTech Connect (OSTI)

    Kostova, M.; Howard, D.; Elder, P.

    2013-07-01

    The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

  17. FRONT BURNER- ISSUE 19

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Cybersecurity Front Burner Issue No. 19 examines Securing the Internet of Things, Facebook Messenger Application, and implementation of the Contractor Training Site.

  18. Tribal Utility Policy Issues

    Broader source: Energy.gov (indexed) [DOE]

    ... Coal Combustion Residuals Regulation Act of 2015 (H.R. 1734) FCC's Connect America Funding to provide broadband to rural communities Gas Utility Issues Pipeline Safety & ...

  19. ISSUES MANAGEMENT PROGRAM MANUAL

    SciTech Connect (OSTI)

    Gravois, Melanie

    2007-06-27

    The Lawrence Berkeley National Laboratory (LBNL) Issues Management Program encompasses the continuous monitoring of work programs, performance and safety to promptly identify issues to determine their risk and significance, their causes, and to identify and effectively implement corrective actions to ensure successful resolution and prevent the same or similar problems from occurring. This document describes the LBNL Issues Management Program and prescribes the process for issues identification, tracking, resolution, closure, validation, and effectiveness of corrective actions. Issues that are governed by this program include program and performance deficiencies or nonconformances that may be identified through employee discovery, internal or external oversight assessment findings, suggested process improvements and associated actions that require formal corrective action. Issues may also be identified in and/or may result in Root Cause Analysis (RCA) reports, Price Anderson Amendment Act (PAAA) reports, Occurrence Reporting and Processing System (ORPS) reports, Accident Investigation reports, assessment reports, and External Oversight reports. The scope of these issues may include issues of both high and low significance as well as adverse conditions that meet the reporting requirements of the University of California (UC) Assurance Plan for LBNL or other reporting entities (e.g., U.S. Environmental Protection Agency, U.S. Department of Energy). Issues that are found as a result of a walk-around or workspace inspection that can be immediately corrected or fixed are exempt from the requirements of this document.

  20. Front Burner- Issue 13

    Broader source: Energy.gov [DOE]

    The Cybersecurity Front Burner Issue No. 13 contained a message from the Associate Chief Information Officer (ACIO) for Cybersecurity as well as a listing of recommended cybersecurity practices.

  1. Front Burner- Issue 16

    Broader source: Energy.gov [DOE]

    The Cybersecurity Front Burner Issue No. 16 addresses Malware, the Worst Passwords of 2013, and the Flat Stanley and Stop.Think.Connect. Campaign.

  2. Front Burner- Issue 18

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Cybersecurity Front Burner Issue No. 18 addresses keeping kids safe on the Internet, cyber crime, and DOE Cyber awareness and training initiatives.

  3. Issues in recycling galvanized scrap

    SciTech Connect (OSTI)

    Koros, P.J.; Hellickson, D.A.; Dudek, F.J.

    1995-02-10

    The quality of the steel used for most galvanizing (and tinplate) applications makes scrap derived from their production and use a premier solid charge material for steelmaking. In 1989 the AISI created a Task Force to define the issues and to recommend technologically and economically sound approaches to assure continued, unhindered recyclability of the growing volume of galvanized scrap. The AISI program addressed the treatment of full-sized industrial bales of scrap. The current, on-going MRI (US)--Argonne National Laboratory program is focused on ``loose`` scrap from industrial and post-consumer sources. Results from these programs, issues of scrap management from source to steel melting, the choices for handling zinc in iron and steelmaking and the benefits/costs for removal of zinc (and lead) from scrap prior to melting in BOF and foundry operations are reviewed in this paper.

  4. DOE Issues Guidance on Electric Vehicle Recharging Stations

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy recently issued guidance to its national laboratory management and operating (M&O) contractors on the installation and operation of electric vehicle recharging...

  5. Licensed reactor nuclear safety criteria applicable to DOE reactors

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    This document is a compilation and source list of nuclear safety criteria that the Nuclear Regulatory Commission (NRC) applies to licensed reactors; it can be used by DOE and DOE contractors to identify NRC criteria to be evaluated for application to the DOE reactors under their cognizance. The criteria listed are those that are applied to the areas of nuclear safety addressed in the safety analysis report of a licensed reactor. They are derived from federal regulations, USNRC regulatory guides, Standard Review Plan (SRP) branch technical positions and appendices, and industry codes and standards.

  6. NETL Sorbents Licensed to Help Lower Power Draw of HVAC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sorbents Licensed To Help Lower Power Draw of HVAC Success Story NETL has licensed one of its patented CO 2 - removal sorbents to Boston-based technology company enVerid Systems. enVerid has adopted the sorbent for use in their proprietary Heat Load Reduction (HLR) module, a retrofit air-recirculation system it designed to increase the energy efficiency of commercial HVAC (heating, ventilation, and air conditioning) systems. HVAC is one of the largest draws of electric power in the United

  7. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3-70). Volume 2, Public comments and NRC response

    SciTech Connect (OSTI)

    Zeitoun, A.

    1994-08-01

    The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are co on, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility.

  8. Current regulatory and licensing status for byproduct sources, facilities and applications

    SciTech Connect (OSTI)

    Tingey, G.L.; Jensen, G.A.; Hazelton, R.F.

    1985-02-01

    Public use of nuclear byproducts, especially radioactive isotopes, will require approval by various regulatory agencies. Use of cesium-137 as an irradiation source for sterilizing medical products will require US Nuclear Regulatory Commission (NRC) approval. Two applications have been filed with NRC, and approval is expected soon. Widespread use of irradiation for food products depends on a favorable ruling by the Food and Drug Administration (FDA). A ruling is pending that would permit irradiation of fruits and vegetables up to 100 krad. NRC also controls the use of isotopes in remote power generators, but little regulatory action has been required in recent years. Recent development of radioluminescent (RL) lighting for runway lights has led to interest by commercial manufacturers. At the present time, a license has been issued to at least one manufacturer for sale of tritium-powered runway lights. 28 refs., 1 fig.

  9. Hydrogen Delivery Options and Issues

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Options and Issues Mark Paster DOE August, 2006 Scope * From the end point of central or distributed production (300 psi H2) to and including the dispenser at a refueling station or stationary power site - GH2 Pipelines and Trucks, LH2 Trucks, Carriers <$1.00/kg of Hydrogen by 2017 Hydrogen Delivery H2 Delivery Current Status * Technology - GH2 Tube Trailers: ~340 kg, ~2600 psi - LH2 Trucks: ~3900 kg - Pipelines: up to 1500 psi (~630 miles in the U.S.) - Refueling Site Operations

  10. CATEGORIZATION OF EVENT SEQUENCES FOR LICENSE APPLICATION

    SciTech Connect (OSTI)

    G.E. Ragan; P. Mecheret; D. Dexheimer

    2005-04-14

    The purposes of this analysis are: (1) Categorize (as Category 1, Category 2, or Beyond Category 2) internal event sequences that may occur before permanent closure of the repository at Yucca Mountain. (2) Categorize external event sequences that may occur before permanent closure of the repository at Yucca Mountain. This includes examining DBGM-1 seismic classifications and upgrading to DBGM-2, if appropriate, to ensure Beyond Category 2 categorization. (3) State the design and operational requirements that are invoked to make the categorization assignments valid. (4) Indicate the amount of material put at risk by Category 1 and Category 2 event sequences. (5) Estimate frequencies of Category 1 event sequences at the maximum capacity and receipt rate of the repository. (6) Distinguish occurrences associated with normal operations from event sequences. It is beyond the scope of the analysis to propose design requirements that may be required to control radiological exposure associated with normal operations. (7) Provide a convenient compilation of the results of the analysis in tabular form. The results of this analysis are used as inputs to the consequence analyses in an iterative design process that is depicted in Figure 1. Categorization of event sequences for permanent retrieval of waste from the repository is beyond the scope of this analysis. Cleanup activities that take place after an event sequence and other responses to abnormal events are also beyond the scope of the analysis.