Sample records for operating licenses issued

  1. NETL Issues Licenses for its Arc Position Sensing Technology | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Issues Licenses for its Arc Position Sensing Technology NETL Issues Licenses for its Arc Position Sensing Technology May 27, 2015 - 8:57am Addthis NETL Issues Licenses for its Arc Position Sensing Technology The U.S. Department of Energy's National Energy Technology Laboratory (NETL) has issued two licenses involving its Arc Position Sensing (APS) technology to KW Associates LLC, an Oregon-based company founded by the technology's inventors. APS technology is a patented,

  2. Technical issues in licensing low-level radioactive waste facilities

    SciTech Connect (OSTI)

    Junkert, R.

    1993-03-01

    The California Department of Health Service spent two years in the review of an application for a low-level radioactive waste disposal facility in California. During this review period a variety of technical issues had to be evaluated and resolved. One of the first issues was the applicability and use of NRC guidance documents for the development of LLW disposal facilities. Other technical issues that required intensive evaluations included surface water hydrology, seismic investigation, field and numerical analysis of the unsaturated zone, including a water infiltration test. Source term verification became an issue because of one specific isotope that comprised more than 90% of the curies projected for disposal during the operational period. The use of trench liners and the proposed monitoring of the unsaturated zone were reviewed by a highly select panel of experts to provide guidance on the need for liners and to ensure that the monitoring system was capable of monitoring sufficient representative areas for radionuclides in the soil, soil gas, and soil moisture. Finally, concerns about the quality of the preoperational environmental monitoring program, including data, sample collection procedures, laboratory analysis, data review and interpretation and duration of monitoring caused a significant delay in completing the licensing review.

  3. Application of coupled codes for safety analysis and licensing issues

    SciTech Connect (OSTI)

    Langenbuch, S.; Velkov, K.

    2006-07-01

    An overview is given on the development and the advantages of coupled codes which integrate 3D neutron kinetics into thermal-hydraulic system codes. The work performed within GRS by coupling the thermal-hydraulic system code ATHLET and the 3D neutronics code QUABOX/CUBBOX is described as an example. The application of the coupled codes as best-estimate simulation tools for safety analysis is discussed. Some examples from German licensing practices are given which demonstrate how the improved analytical methods of coupled codes have contributed to solve licensing issues related to optimized and more economical use of fuel. (authors)

  4. Energy Department Issues Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a final Request for Proposal (RFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities contract is for managing Spent Nuclear Fuel (SNF) storage facilities and licenses under NRC regulations.

  5. Land based crane operator training and licensing program

    SciTech Connect (OSTI)

    Borg, R. van der; Dingman, S.

    1995-12-31

    Working safely and having a healthy respect for safety has always been important to the Corps of Engineers. Because we recognize the increased importance of safety to crane operations, we have developed this Training and Licensing program for all crane operators. What the guidelines and this program intends is, think before you act and thinking requires a knowledge base. We feel the following program strengthens the guidelines to enable competent as well as confident crane operations by our personnel. This document outlines the Corps of Engineer`s Land Based Crane Training and Licensing Program for Class I, II, and III operators. The Corps of Engineer`s Portland District Operation`s Division melded guidelines from industry with specific Corps regulations to produce this program. The Crane Licensing and Training program includes three crane operator classes. Each class discusses licensing, physical and academic requirements and performance evaluations. Other related personnel and their responsibilities are also discussed. These include rigger/signalmen, maintenance staff, and inspectors. A section on testing requirements for specific needs follows with a glossary at the end of this document.

  6. Energy Department Issues Draft Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition Planning.

  7. Resolution of thermal-hydraulic safety and licensing issues for the system 80+{sup {trademark}} design

    SciTech Connect (OSTI)

    Carpentino, S.E.; Ritterbusch, S.E.; Schneider, R.E.

    1995-09-01

    The System 80+{sup {trademark}} Standard Design is an evolutionary Advanced Light Water Reactor (ALWR) with a generating capacity of 3931 MWt (1350 MWe). The Final Design Approval (FDA) for this design was issued by the Nuclear Regulatory Commission (NRC) in July 1994. The design certification by the NRC is anticipated by the end of 1995 or early 1996. NRC review of the System 80+ design has involved several new safety issues never before addressed in a regulatory atmosphere. In addition, conformance with the Electric Power Research Institute (EPRI) ALWR Utility Requirements Document (URD) required that the System 80+ plant address nuclear industry concerns with regard to design, construction, operation and maintenance of nuclear power plants. A large number of these issues/concerns deals with previously unresolved generic thermal-hydraulic safety issues and severe accident prevention and mitigation. This paper discusses the thermal-hydraulic analyses and evaluations performed for the System 80+ design to resolve safety and licensing issues relevant to both the Nuclear Stream Supply System (NSSS) and containment designs. For the NSSS design, the Safety Depressurization System mitigation capability and resolution of the boron dilution concern are described. Examples of containment design issues dealing with containment shell strength, robustness of the reactor cavity walls and hydrogen mixing under severe accident conditions are also provided. Finally, the overall approach used in the application of NRC`s new (NUREG-1465) radiological source term for System 80+ evaluation is described. The robustness of the System 80+ containment design to withstand severe accident consequences was demonstrated through detailed thermal-hydraulic analyses and evaluations. This advanced design to shown to meet NRC severe accident policy goals and ALWR URD requirements without any special design features and unnecessary costs.

  8. DOE, NRC Issue Licensing Roadmap For Next-Generation Nuclear...

    Energy Savers [EERE]

    an advanced reactor design by 2017 and begin operation by 2021. The NGNP represents a new concept for nuclear energy utilization, in which a gas-cooled reactor provides process ...

  9. Safety and licensing issues that are being addressed by the Power Burst Facility test programs. [PWR; BWR

    SciTech Connect (OSTI)

    McCardell, R.K.; MacDonald, P.E.

    1980-01-01

    This paper presents an overview of the results of the experimental program being conducted in the Power Burst Facility and the relationship of these results to certain safety and licensing issues. The safety issues that were addressed by the Power-Cooling-Mismatch, Reactivity Initiated Accident, and Loss of Coolant Accident tests, which comprised the original test program in the Power Burst Facility, are discussed. The resolution of these safety issues based on the results of the thirty-six tests performed to date, is presented. The future resolution of safety issues identified in the new Power Burst Facility test program which consists of tests which simulate BWR and PWR operational transients, anticipated transients without scram, and severe fuel damage accidents, is described.

  10. Status of safety issues at licensed power plants: TMI Action Plan requirements; unresolved safety issues; generic safety issues; other multiplant action issues. Supplement 3

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    As part of ongoing US Nuclear Regulatory Commission (NRC) efforts to ensure the quality and accountability of safety issue information, the NRC established a program for publishing an annual report on the status of licensee implementation and NRC verification of safety issues in major NRC requirements areas. This information was initially compiled and reported in three NUREG-series volumes. Volume 1, published in March 1991, addressed the status of Three Mile Island (TMI) Action Plan Requirements. Volume 2, published in May 1991, addressed the status of unresolved safety issues (USIs). Volume 3, published in June 1991, addressed the implementation and verification status of generic safety issues (GSIs). The first annual supplement, which combined these volumes into a single report and presented updated information as of September 30, 1991, was published in December 1991. The second annual supplement, which provided updated information as of September 30, 1992, was published in December 1992. Supplement 2 also provided the status of licensee implementation and NRC verification of other multiplant action (MPA) issues not related to TMI Action Plan requirements, USIs, or GSIs. This third annual NUREG report, Supplement 3, presents updated information as of September 30, 1993. This report gives a comprehensive description of the implementation and verification status of TMI Action Plan requirements, safety issues designated as USIs, GSIs, and other MPAs that have been resolved and involve implementation of an action or actions by licensees. This report makes the information available to other interested parties, including the public. Additionally, this report serves as a follow-on to NUREG-0933, ``A Prioritization of Generic Safety Issues,`` which tracks safety issues until requirements are approved for imposition at licensed plants or until the NRC issues a request for action by licensees.

  11. Licensing of spent fuel dry storage and consolidated rod storage: A Review of Issues and Experiences

    SciTech Connect (OSTI)

    Bailey, W.J.

    1990-02-01

    The results of this study, performed by Pacific Northwest Laboratory (PNL) and sponsored by the US Department of Energy (DOE), respond to the nuclear industry's recommendation that a report be prepared that collects and describes the licensing issues (and their resolutions) that confront a new applicant requesting approval from the US Nuclear Regulatory Commission (NRC) for dry storage of spent fuel or for large-scale storage of consolidated spent fuel rods in pools. The issues are identified in comments, questions, and requests from the NRC during its review of applicants' submittals. Included in the report are discussions of (1) the 18 topical reports on cask and module designs for dry storage fuel that have been submitted to the NRC, (2) the three license applications for dry storage of spent fuel at independent spent fuel storage installations (ISFSIs) that have been submitted to the NRC, and (3) the three applications (one of which was later withdrawn) for large-scale storage of consolidated fuel rods in existing spent fuel storage pools at reactors that were submitted tot he NRC. For each of the applications submitted, examples of some of the issues (and suggestions for their resolutions) are described. The issues and their resolutions are also covered in detail in an example in each of the three subject areas: (1) the application for the CASTOR V/21 dry spent fuel storage cask, (2) the application for the ISFSI for dry storage of spent fuel at Surry, and (3) the application for full-scale wet storage of consolidated spent fuel at Millstone-2. The conclusions in the report include examples of major issues that applicants have encountered. Recommendations for future applicants to follow are listed. 401 refs., 26 tabs.

  12. Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report

    Broader source: Energy.gov [DOE]

    The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States.

  13. Site selection and licensing issues: Southwest Compact low-level radioactive waste disposal site

    SciTech Connect (OSTI)

    Grant, J.L.

    1989-11-01

    The low-level radioactive waste disposal site in California is being selected through a three-phase program. Phase 1 is a systematic statewide, regional, and local screening study. This program was conducted during 1986 and 1987, and culminated in the selection of three candidate sites fur further study. The candidate sites are identified as the Panamint, Silurian, and Ward Valley sites. Phase 2 comprises site characterization and environmental and socio-economic impact study activities at the three candidate sites. Based upon the site characterization studies, the candidate sites are ranked according to the desirability and conformance with regulatory requirements. Phase 3 comprises preparation of a license application for the selected candidate site. The license application will include a detailed characterization of the site, detailed design and operations plans for the proposed facility, and assessments of potential impacts of the site upon the environment and the local communities. Five types of siting criteria were developed to govern the site selection process. These types are: technical suitability exclusionary criteria, high-avoidance criteria beyond technical suitability requirements, discretionary criteria, public acceptance, and schedule requirements of the LLWR Policy Act Amendments. This paper discusses the application of the hydrological and geotechnical criteria during the siting and licensing studies in California. These criteria address site location and performance, and the degree to which present and future site behavior can be predicted. Primary regulatory requirements governing the suitability of a site are that the site must be hydrologically and geologically simple enough for the confident prediction of future behavior, and that the site must be stable enough that frequent or intensive maintenance of the closed site will not be required. This paper addresses the methods to measure site suitability at each stage of the process, methods to

  14. Operational Issues at the Environmental Restoration Disposal Facility at

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford | Department of Energy Operational Issues at the Environmental Restoration Disposal Facility at Hanford Operational Issues at the Environmental Restoration Disposal Facility at Hanford Full Document and Summary Versions are available for download Operational Issues at the Environmental Restoration Disposal Facility at Hanford (238.34 KB) Summary - Operational Issues at the Environmental Restoration Disposal Facility (ERDF) at Hanford (56.27 KB) More Documents & Publications Idaho

  15. Challenge # 3 … Operational Issues | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 … Operational Issues Challenge # 3 … Operational Issues Fernando Preto presentation on May 9, 2012, at the Pyrolysis Oil Workshop on Challenge #3 Operational Issues. pyrolysis_challenge3.pdf (1.15 MB) More Documents & Publications U.S., Canada, and Finland Pyrolysis Collaborations Technical Information Exchange on Pyrolysis Oil: Potential for a Renewab;e Heating Oil Substation Fuel in New England 2013 Peer Review Presentations-Bio-oil

  16. DOE Issues Request for Information for Richland Operations Office...

    Office of Environmental Management (EM)

    Contract Acquisition Planning- Occupational Medical Services (OccMed) DOE Issues Request for Information for Richland Operations Office Richland Acquisitions - Post Fiscal Year ...

  17. Fundamental Issues in Subzero PEMFC Startup and Operation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fundamental issues in subzero PEMFC startup and operation Jeremy P. Meyers February 1, 2005 DOE Freeze Workshop Outline of presentation * Motivation * Stack performance * ...

  18. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    Until 1994, Florida offered limited specialty licenses for residential solar hot water and pool heating, as well a general solar contractor's license. These specialty licenses have not been issued...

  19. Licensed operating reactors. Status summary report data as of December 31, 1993

    SciTech Connect (OSTI)

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  20. Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19

    SciTech Connect (OSTI)

    1995-04-01

    The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  1. DOE LABORATORY OPEN SOURCE SOFTWARE: ADVANCE DOE PROGRAM Approval and other oss Licensing Issues

    Broader source: Energy.gov [DOE]

    On Feb 1, 2002, DOE Patent Counsel issued an IPI-II-1-01 for "Development and Use of Open Source Software."

  2. Issues in the review of a license application for an above grade low-level radioactive waste disposal facility

    SciTech Connect (OSTI)

    Ringenberg, J.D.

    1993-03-01

    In December 1987, Nebraska was selected by the Central Interstate Compact (CIC) Commission as the host state for the construction of a low-level radioactive waste disposal facility. After spending a year in the site screening process, the Compact`s developer, US Ecology, selected three sites for detailed site characterization. These sites were located in Nemaha, Nuckolls and Boyd Counties. One year later the Boyd County site was selected as the preferred site and additional site characterization studies were undertaken. On July 29, 1990, US Ecology submitted a license application to the Nebraska Department of Environmental Control (now Department of Environmental Quality-NDEQ). This paper will present issues that the NDEQ has dealt with since Nebraska`s selection as the host state for the CIC facility.

  3. Master Software License Agreement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... that system. 4. SCOPE OF LICENSE USE. Regardless of the ... and use the Product in support of GE's internal, research ... consolidate computer or network operations), andor other ...

  4. Operational Issues at the Environmental Restoration Disposal Facility at Hanford

    Office of Environmental Management (EM)

    Operating Guidelines Appendix C D.DOC� Operating Guidelines Appendix C D.DOC� Operating Guidelines Appendix C D.DOC� (41.73 KB) More Documents & Publications Operating Guidelines Appendix A B.DOC� DOE HR Guidebook 12_15_05.DOC� Questions and Answers 202-05-03 | Department of Energy

    Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03

  5. Fundamental Issues in Subzero PEMFC Startup and Operation

    Broader source: Energy.gov [DOE]

    Presentation by Jeremy Meyers to DOE's Fuel Cell Operations at Sub-Freezing Temperatures Workshop held February 1-5, 2005 in Phoenix, Arizona.

  6. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Ames Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor to operate Ames...

  7. Licensing | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensing Argonne's Technology Development & Commercialization (TDC) Division negotiates and manages license agreements on behalf of UChicago Argonne, LLC, which operates Argonne National Laboratory for the U.S. Department of Energy. Argonne licenses a broad range of cutting-edge technologies to private industry. The TDC team seeks as licensees companies that can manage the requisite financial, research and development, manufacturing, marketing, and management functions necessary to

  8. License Structure for Multi-Module Facilities

    SciTech Connect (OSTI)

    Thomas Hicks

    2010-08-01

    The Next Generation Nuclear Plant (NGNP) Project is intended to be the prototype for multi-module commercial high temperature gas reactors (HTGRs) for process heat and/or electricity generation. Part of the objectives of the project are to establish the conditions that would govern or enhance the design, licensing, construction and operation of numerous, modular nuclear plants, particularly suited for industrial applications or that could reduce the risk of such projects. A determination is desired regarding whether a multi-module reactor plant can be licensed with a single Nuclear Regulatory Commission (NRC) review, hearing, and safety evaluation report. If it is determined that a multi-modular reactor plant can be licensed under a single review/hearing process, the structure and the duration of the license for each module will also need to be determined. The purpose of this paper is to describe for the NRC the NGNP position on these two issues and obtain either NRC general concurrence or comments on the approach to these issues. While the current NGNP planning provides for only a single reactor module, the project is intended to provide the basis and establish a licensing framework that can be used by future commercial HTGRs and other reactor designs, including a variety of small modular reactor technologies, with configurations reflecting design standardization of multi-module plants. Therefore, it is important to identify a path for addressing these modular reactor plant issues so that the resolution can be factored into the NGNP Project planning. The NGNP position is that a single combined license (COL) application can be submitted for a multi-modular reactor facility, the COL application can undergo a single NRC review/hearing process, and each module should be issued a separate license.

  9. DOE Issues Final Request for Proposal for the Operation of Depleted Uranium

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hexafluoride (DUF6) Conversion Facilities | Department of Energy the Operation of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities DOE Issues Final Request for Proposal for the Operation of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities September 8, 2015 - 3:00pm Addthis Media Contact Lynette Chafin, 513-246-0461, Lynette.Chafin@emcbc.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today issued a Final Request for Proposal (RFP), for the Operation of Depleted

  10. Licensing Technology

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensing Technology Licensing Technology The primary function of Los Alamos Licensing Program is to move Los Alamos technology to the marketplace for the benefit of the U.S. economy. Our intellectual property may be licensed for commercial use, research applications, and U.S. government use. Contact thumbnail of Marcus Lucero Head of Licensing Marcus Lucero Richard P. Feynman Center for Innovation (505) 665-6569 Email Although Los Alamos's primary mission is national security, our technologies

  11. DOE Issues Safety Assessments for Diesel-Operated Equipment Underground at WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 5, 2015 DOE Issues Safety Assessments for Diesel-Operated Equipment Underground at WIPP The Office of Nuclear Safety and Environmental Assessments, within the U.S. Department of Energy's independent Office of Enterprise Assessments (EA), recently issued reports following reviews conducted on the WIPP Recovery Plan for Operating Diesel Equipment with available underground airflows and the Conduct of Maintenance and associated planned program enhancements. The onsite portions of the

  12. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    its Princeton Plasma Physics Laboratory | Department of Energy Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a contractor to manage and operate Princeton Plasma Physics Laboratory (PPPL), a DOE Office of Science research facility

  13. Issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issue One of the challenges at Sandia National Laboratories is addressing the issue of predictively connecting the macroscopic properties of metals to their micro- and nanostructure. While this issue may seem straightforward, it is anything but trivial. Materials are intrinsically inhomogeneous, but the relationship between microstructural variability and resulting properties is often unknown. Approach PPM is comprised of a group of multidisciplinary staff, post-docs, and university

  14. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Argonne National Laboratory | Department of Energy Argonne National Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Argonne National Laboratory April 19, 2006 - 10:23am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximated $2.54 billion, five-year management and operating contract for Argonne National Laboratory (ANL), a DOE Office

  15. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fermi National Accelerator Laboratory | Department of Energy Fermi National Accelerator Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory July 10, 2006 - 2:57pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximately $1.58 billion, five-year management and operating contract for Fermi National

  16. DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) issued a Draft Request for Proposal (RFP) seeking a management and operations contractor to maintain the Waste Isolation Pilot Plan (WIPP) and manage the DOE National Transuranic Waste (TRU) Program in Carlsbad, New Mexico.

  17. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Revision 14 Job Hazard Analysis Performance and Development Management Control Procedure EFFECTIVE DATE: 03/30/16 Tom Ferguson APPROVED FOR USE WP 12-IS3002 ISSUED WP 12-IS3002 Rev. 14 Page 2 of 22 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 3 INTRODUCTION ............................................................................................................. 4 REFERENCES

  18. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    02/09/16 WP 15-HS.02 Revision 9 Occupational Health Program Cognizant Department: Safety and Health Approved by: Tom Ferguson ISSUED WIPP Occupational Health Program WP 15-HS.02, Rev. 9 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 4 ABBREVIATIONS AND ACRONYMS ............................................................................. 5 PREFACE

  19. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Effective Date: 10/01/15 WP 15-GM.02 Revision 10 Worker Safety and Health Program Description Cognizant Section: Industrial Safety & Health Approved by: Signature on File Phil Breidenbach, President & Project Manager, NWP Approved by: Signature on File Dana Bryson, Acting Manager, CBFO ISSUED Worker Safety and Health Program Description WP 15-GM.02, Rev. 10 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 4

  20. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12/01/15 WP 15-GM.03 Revision 9 Integrated Safety Management System Description Cognizant Section: Environmental, Safety and Health Approved by: Signature on File / 11/16/15 Phil Breidenbach, President & Project Manager, NWP Date Approved by: Signature on File / 11/30/15 Todd Shrader Manager, CBFO Date ISSUED Integrated Safety Management System Description WP 15-GM.03, Rev. 9 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY

  1. File System Licenses in SLURM

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    File System Licenses in SLURM Introduction Users can now specify the filesystems required for their jobs by requesting "licenses" for them in their batch scripts. With this new SLURM license feature, a batch job will not start if the specified file system is unavailable due to maintenance or an outage, or if we've detected that it's having performance issues. This will protect your jobs from failures or decreased performance from known issues. We encourage everyone to use the SLURM

  2. Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

    SciTech Connect (OSTI)

    Wang, Liping; Hong, Tianzhen

    2013-01-01

    Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensors used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1) direct

  3. Summary - Operational Issues at the Environmental Restoration Disposal Facility (ERDF) at Hanford

    Office of Environmental Management (EM)

    ERDF ETR Report Date: June 2007 ETR-6 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Operational Issues at the Environmental Restoration Disposal Facility(ERDF) at Hanford Why DOE-EM Did This Review The ERDF is a large- scale disposal facility authorized to receive waste from Hanford cleanup activities. It contains double-lined cells with a RCRA Subtitle C- type liner and leachate collection system. By 2007, 6.8 million tons of

  4. Uranium-Loaded Water Treatment Resins: 'Equivalent Feed' at NRC and Agreement State-Licensed Uranium Recovery Facilities - 12094

    SciTech Connect (OSTI)

    Camper, Larry W.; Michalak, Paul; Cohen, Stephen; Carter, Ted

    2012-07-01

    Community Water Systems (CWSs) are required to remove uranium from drinking water to meet EPA standards. Similarly, mining operations are required to remove uranium from their dewatering discharges to meet permitted surface water discharge limits. Ion exchange (IX) is the primary treatment strategy used by these operations, which loads uranium onto resin beads. Presently, uranium-loaded resin from CWSs and mining operations can be disposed as a waste product or processed by NRC- or Agreement State-licensed uranium recovery facilities if that licensed facility has applied for and received permission to process 'alternate feed'. The disposal of uranium-loaded resin is costly and the cost to amend a uranium recovery license to accept alternate feed can be a strong disincentive to commercial uranium recovery facilities. In response to this issue, the NRC issued a Regulatory Issue Summary (RIS) to clarify the agency's policy that uranium-loaded resin from CWSs and mining operations can be processed by NRC- or Agreement State-licensed uranium recovery facilities without the need for an alternate feed license amendment when these resins are essentially the same, chemically and physically, to resins that licensed uranium recovery facilities currently use (i.e., equivalent feed). NRC staff is clarifying its current alternate feed policy to declare IX resins as equivalent feed. This clarification is necessary to alleviate a regulatory and financial burden on facilities that filter uranium using IX resin, such as CWSs and mine dewatering operations. Disposing of those resins in a licensed facility could be 40 to 50 percent of the total operations and maintenance (O and M) cost for a CWS. Allowing uranium recovery facilities to treat these resins without requiring a license amendment lowers O and M costs and captures a valuable natural resource. (authors)

  5. Issue Paper Potential Water Availability Problems Associated with Geothermal Energy Operations

    SciTech Connect (OSTI)

    1982-02-19

    The report is the first to study and discuss the effect of water supply problems of geothermal development. Geothermal energy resources have the potential of making a significant contribution to the U.S. energy supply situation, especially at the regional and local levels where the resources are located. A significant issue of concern is the availability and cost of water for use in a geothermal power operation primarily because geothermal power plants require large quantities of water for cooling, sludge handling and the operation of environmental control systems. On a per unit basis, geothermal power plants, because of their inherent high heat rejection rates, have cooling requirements several times greater than the conventional fossil fuel plants and therefore the supply of water is a critical factor in the planning, designing, and siting of geothermal power plants. However, no studies have been specifically performed to identify the water requirements of geothermal power plants, the underlying causes of water availability problems, and available techniques to alleviate some of these problems. There is no cost data included in the report. The report includes some descriptions of known geothermal areas. [DJE-2005

  6. Renewable Resource Integration Project - Scoping Study of Strategic Transmission, Operations, and Reliability Issues

    SciTech Connect (OSTI)

    Eto, Joseph; Budhraja, Vikram; Ballance, John; Dyer, Jim; Mobasheri, Fred; Eto, Joseph

    2008-07-01

    California is on a path to increase utilization of renewable resources. California will need to integrate approximately 30,000 megawatts (MW) of new renewable generation in the next 20 years. Renewable resources are typically located in remote locations, not near the load centers. Nearly two/thirds or 20,000 MW of new renewable resources needed are likely to be delivered to Los Angeles Basin transmission gateways. Integration of renewable resources requires interconnection to the power grid, expansion of the transmission system capability between the backbone power grid and transmission gateways, and increase in delivery capacity from transmission gateways to the local load centers. To scope the transmission, operations, and reliability issues for renewables integration, this research focused on the Los Angeles Basin Area transmission gateways where most of new renewables are likely. Necessary actions for successful renewables integration include: (1) Expand Los Angeles Basin Area transmission gateway and nomogram limits by 10,000 to 20,000 MW; (2) Upgrade local transmission network for deliverability to load centers; (3) Secure additional storage, demand management, automatic load control, dynamic pricing, and other resources that meet regulation and ramping needed in real time operations; (4) Enhance local voltage support; and (5) Expand deliverability from Los Angeles to San Diego and Northern California.

  7. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    Utah's Division of Occupational and Professional Licensing requires installers of solar energy systems to be licensed contractors. General electrical contractors carrying an S200 or an S201...

  8. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    Hawaii offers several specialty licenses for solar contractors through Hawaii’s Department of Commerce and Consumer Affairs. The following specialty licenses are available: Solar Power Systems...

  9. Texas site selection and licensing status

    SciTech Connect (OSTI)

    Avant, R.V. Jr.

    1989-11-01

    Texas has identified a potential site in Hudspeth County in far West Texas near the town of Fort Hancock. Over the past year the Texas Low-Level Radioactive Waste Disposal Authority has been conducting detailed geology, hydrology, meteorology, soils, and flora and fauna evaluations. An authorization by the Board of Directors of the Authority to proceed with a license application, assuming that the detailed evaluation indicates that the site is suitable, is expected by September. A prototype license has been prepared in anticipation of the order to proceed with licensing, and the formal license application is expected to be submitted to the Texas Department of Health-Bureau of Radiation Control in December, meeting the license application milestone. Although site selection processes in all siting areas across the country have experienced organized opposition, El Paso County has funded a particularly well-organized, well-financed program to legally and technically stop consideration of the Fort Hancock site prior to the licensing process. Many procedural, regulatory, and technical issues have been raised which have required responses from the Authority in order to proceed with licensing. This has provided a unique perspective of what to expect from well-organized opposition at the licensing stage. This paper presents an update on the Texas siting activity with detailed information on the site evaluation and license application. Experience of dealing with issues raised by opposition relating to NRC guidelines and rules is also discussed.

  10. Exposure Based Health Issues Project Report: Phase I of High Level Tank Operations, Retrieval, Pretreatment, and Vitrification Exposure Based Health Issues Analysis

    SciTech Connect (OSTI)

    Stenner, Robert D.; Bowers, Harold N.; Kenoyer, Judson L.; Strenge, Dennis L.; Brady, William H.; Ladue, Buffi; Samuels, Joseph K.

    2001-11-30

    The Department of Energy (DOE) has the responsibility to understand the ''big picture'' of worker health and safety which includes fully recognizing the vulnerabilities and associated programs necessary to protect workers at the various DOE sites across the complex. Exposure analysis and medical surveillance are key aspects for understanding this big picture, as is understanding current health and safety practices and how they may need to change to relate to future health and safety management needs. The exposure-based health issues project was initiated to assemble the components necessary to understand potential exposure situations and their medical surveillance and clinical aspects. Phase I focused only on current Hanford tank farm operations and serves as a starting point for the overall project. It is also anticipated that once the pilot is fully developed for Hanford HLW (i.e., current operations, retrieval, pretreatment, vitrification, and disposal), the process and analysis methods developed will be available and applicable for other DOE operations and sites. The purpose of this Phase I project report is to present the health impact information collected regarding ongoing tank waste maintenance operations, show the various aspects of health and safety involved in protecting workers, introduce the reader to the kinds of information that will need to be analyzed in order to effectively manage worker safety.

  11. NREL: Technology Transfer - Licensing Agreements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    using, and selling of the licensed technology, methods, or products. 5. Negotiate License Language The company then reviews and comments on the license agreement draft. If needed,...

  12. DOE Issues Final Request for Proposal for the Operation of Depleted...

    Broader source: Energy.gov (indexed) [DOE]

    Operation of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities at Paducah, Kentucky and Portsmouth, Ohio. A cost-plus award fee and firm-fixed-price contract line item ...

  13. Task 23 - background report on subsurface environmental issues relating to natural gas sweetening and dehydration operations. Topical report, February 1, 1994--February 28, 1996

    SciTech Connect (OSTI)

    Sorensen, J.A.

    1998-12-31

    This report describes information pertaining to environmental issues, toxicity, environmental transport, and fate of alkanolamines and glycols associated with natural gas sweetening and dehydration operations. Waste management associated with the operations is also discussed.

  14. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2

    SciTech Connect (OSTI)

    1996-02-01

    NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  15. Renewable Energy Contractor Licensing

    Broader source: Energy.gov [DOE]

    Companies with an electrical contractor license may engage in the business of making electrical installations. Similarly a plumbing contractor license allows a company to engage in the business of...

  16. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    SciTech Connect (OSTI)

    Eugene S. Grecheck David P. Batalo

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  17. Licensing Process | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensing Process Through licensing of its intellectual property rights, NREL provides industry with an opportunity to commercialize NREL-developed energy technologies and products. Our licensing opportunities are available to both small and large businesses-from start-ups to Fortune 500 companies. Step-by-Step Process 1. Identify and Qualify Opportunity To identify a licensing opportunity, a company can browse the Energy Innovation Portal. From the Portal, the company can review publically

  18. Renewing the licenses of US nuclear plants: An assessment of the socioeconomic impacts

    SciTech Connect (OSTI)

    Schweitzer, M.; Saulsbury, J.W. ); Schexnayder, S.M. )

    1993-01-01

    In recent years, increased national attention has been focused on the potential effects of renewing, or not renewing, the licenses of nuclear power plants as the oldest of them approach the end of the 40-year operating period allowed by their original licenses. As part of a larger study for the US Nuclear Regulatory commission (NRC), the authors conducted an assessment of the potential socioeconomic impacts to those communities throughout the country in which nuclear power plants are located and which, therefore, are most directly affected by renewal of nuclear power plant licenses. This paper focuses on six key issues that are traditionally considered essential in the assessment of social impacts: Population; housing; tax payments; local public services; land use and development; and economic structure.

  19. Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 4: June 8, 2009 Vehicles per Licensed Driver Rising Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising The number of vehicles in operation per licensed driver has risen steadily since 1950. In 1985, for the first time, there was one vehicle for every licensed driver. Since 1985, the number of vehicles in operation has exceeded the number of licensed drivers reaching a level of 1.21 vehicles per licensed driver in 2007. Vehicles per Licensed Driver, 1950-2007 Line graph

  20. Investigation on Flame Characteristics and Burner Operability Issues of Oxy-Fuel Combustion

    SciTech Connect (OSTI)

    Choudhuri, Ahsan

    2013-09-30

    Oxy-fuel combustion has been used previously in a wide range of industrial applications. Oxy- combustion is carried out by burning a hydrocarbon fuel with oxygen instead of air. Flames burning in this configuration achieve higher flame temperatures which present opportunities for significant efficiency improvements and direct capture of CO2 from the exhaust stream. In an effort to better understand and characterize the fundamental flame characteristics of oxy-fuel combustion this research presents the experimental measurements of flame stability of various oxyfuel flames. Effects of H2 concentration, fuel composition, exhaust gas recirculation ratio, firing inputs, and burner diameters on the flame stability of these fuels are discussed. Effects of exhaust gas recirculation i.e. CO2 and H2O (steam) acting as diluents on burner operability are also presented. The roles of firing input on flame stability are then analyzed. For this study it was observed that many oxy-flames did not stabilize without exhaust gas recirculation due to their higher burning velocities. In addition, the stability regime of all compositions was observed to decrease as the burner diameter increased. A flashback model is also presented, using the critical velocity gradient gF) values for CH4-O2-CO2 flames. The second part of the study focuses on the experimental measurements of the flow field characteristics of premixed CH4/21%O2/79%N2 and CH4/38%O2/72%CO2 mixtures at constant firing input of 7.5 kW, constant, equivalence ratio of 0.8, constant swirl number of 0.92 and constant Reynolds Numbers. These measurements were taken in a swirl stabilized combustor at atmospheric pressure. The flow field visualization using Particle Imaging Velocimetry (PIV) technique is implemented to make a better understanding of the turbulence characteristics of

  1. Licensable Life Science Technologies | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensable Life Science Technologies A selection of biology-based technologies available for licensing PDF icon licensable_biological_technologies

  2. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    In June 2005, Assembly Bill 3 amended the Nevada Revised Statutes, Chapter 618, to create a mandatory licensing program for contractors installing and maintaining photovoltaic systems, beginning...

  3. Solar Contractor Licensing

    Broader source: Energy.gov [DOE]

    The Arizona Registrar of Contractors does have a specific plumbing license which includes solar water heaters. R-37 is required for contractors installing or performing maintenance on residential...

  4. Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification, Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance

    SciTech Connect (OSTI)

    R. Fink, D. Hill, J. O'Hara

    2004-11-30

    Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.

  5. Analysis of environmental issues related to small-scale hydroelectric development. VI. Dissolved oxygen concentrations below operating dams

    SciTech Connect (OSTI)

    Cada, G.F.; Kumar, K.D.; Solomon, J.A.; Hildebrand, S.G.

    1982-01-01

    Results are presented of an effort aimed at determining whether or not water quality degradation, as exemplified by dissolved oxygen concentrations, is a potentially significant issue affecting small-scale hydropower development in the US. The approach was to pair operating hydroelectric sites of all sizes with dissolved oxygen measurements from nearby downstream US Geological Survey water quality stations (acquired from the WATSTORE data base). The USGS data were used to calculate probabilities of non-compliance (PNCs), i.e., the probabilities that dissolved oxygen concentrations in the discharge waters of operating hydroelectric dams will drop below 5 mg/l. PNCs were estimated for each site, season (summer vs remaining months), and capacity category (less than or equal to 30 MW vs >30 MW). Because of the low numbers of usable sites in many states, much of the subsequent analysis was conducted on a regional basis. During the winter months (November through June) all regions had low mean PNCs regardless of capacity. Most regions had higher mean PNCs in summer than in winter, and summer PNCs were greater for large-scale than for small-scale sites. Among regions, the highest mean summer PNCs were found in the Great Basin, the Southeast, and the Ohio Valley. To obtain a more comprehensive picture of the effects of season and capacity on potential dissolved oxygen problems, cumulative probability distributions of PNC were developed for selected regions. This analysis indicates that low dissolved oxygen concentrations in the tailwaters below operating hydroelectric projects are a problem largely confined to large-scale facilities.

  6. NEXT GENERATION NUCLEAR PLANT LICENSING BASIS EVENT SELECTION WHITE PAPER

    SciTech Connect (OSTI)

    Mark Holbrook

    2010-09-01

    The Next Generation Nuclear Plant (NGNP) will be a licensed commercial high temperature gas-cooled reactor (HTGR) plant capable of producing the electricity and high temperature process heat for industrial markets supporting a range of end-user applications. The NGNP Project has adopted the 10 CFR 52 Combined License (COL) application process, as recommended in the Report to Congress, dated August 2008, as the foundation for the NGNP licensing strategy. NRC licensing of the NGNP plant utilizing this process will demonstrate the efficacy of licensing future HTGRs for commercial industrial applications. This white paper is one in a series of submittals that will address key generic issues of the COL priority licensing topics as part of the process for establishing HTGR regulatory requirements.

  7. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1

    SciTech Connect (OSTI)

    1996-02-01

    NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  8. License Iso. CM35

    Office of Legacy Management (LM)

    Reither this license nor my right under this licewe shall be uslgned or otherwise traneferred in violation of the pmvislont of the Atalc Finer&y Act oi 19%. ' Ibis licenae haJ..l ...

  9. License for the Konrad Deep Geological Repository

    SciTech Connect (OSTI)

    Biurrun, E.; Hartje, B.

    2003-02-24

    Deep geological disposal of long-lived radioactive waste is currently considered a major challenge. Until present, only three deep geological disposal facilities have worldwide been operated: the Asse experimental repository (1967-1978) and the Morsleben repository (1971-1998) in Germany as well as the Waste Isolation Pilot Plant (WIPP) in the USA (1999 to present). Recently, the licensing procedure for the fourth such facility, the German Konrad repository, ended with a positive ''Planfeststellung'' (plan approval). With its plan approval decision, the licensing authority, the Ministry of the Environment of the state of Lower Saxony, approved the single license needed pursuant to German law to construct, operate, and later close down this facility.

  10. TTWG Licensing Guide | Department of Energy

    Energy Savers [EERE]

    TTWG Licensing Guide TTWG Licensing Guide PDF icon TTWG Licensing Guide More Documents & Publications ITP Aluminum: Technical Working Group on Inert Anode Technologies EIS-0333:...

  11. Licensing Technologies | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensing Technologies Licensing Technologies New tack cloth leaves no sticky residue. A license is a means of transferring commercial rights for technologies developed at Y-12 to...

  12. License Iso. CM35

    Office of Legacy Management (LM)

    License Iso. CM35 hUhUll4MhiM&POlltYll7~ llolh-thRqalStract Alolan&le, vlrghla Attoatlonl w. & 0. EutahlDon Pursuant to the Atanic Energy Act of 1954 and Section 40.21 or the Code of Federal Regulations, Title 10 - Atomic Energy, Chapter 1, Part 40 - Control of Sauce Haterid, you are hereby licensed to receive possession of and title to three hundred uwi l lght the term of this liceaee for pounda of refined eource material during 880 in meueb and demlopmt aotiritim MDool.atd lfltb

  13. Energy Department Issues Draft Request for Proposals for Operation of its Pacific Northwest National Laboratory in Washington

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued a draft Request for Proposals (RFP) for prospective contractors who are interested in competing on a full and open basis to manage...

  14. Solar Hot Water Contractor Licensing

    Broader source: Energy.gov [DOE]

    In order to obtain one of these specialty licenses, installers must meet the following criteria. The applicant for a Restricted Solar Mechanic license must provide the Arkansas Department of...

  15. NREL: Technology Transfer - Technologies Available for Licensing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ombuds. Printable Version Technology Transfer Home About Technology Transfer Technology Partnership Agreements Licensing Agreements Technologies Available for Licensing...

  16. Combined Construction and Operating License (COL)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... REACTOR SIZE (MWE) APPLICATION EXPECTED SUBMITTAL DATE Light Water Reactors Babcock &Wilcox mPower, Inc. mPower SMR 180 DC CP Late 2013 March 2014 Holtec International ...

  17. Combined Construction and Operating License (COL)

    Broader source: Energy.gov (indexed) [DOE]

    Forge Corporation announced an agreement with Babcock and Wilcox Company to fabricate and qualify large forgings for the B&W mPower SMR. Forgings would be manufactured at Lehigh ...

  18. NRC Licensing Status Summary Report for NGNP

    SciTech Connect (OSTI)

    Moe, Wayne Leland; Kinsey, James Carl

    2014-11-01

    The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction and operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.

  19. Exclusive Patent License Agreement between Alliance and company

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Page 1 of 19 EXCLUSIVE PATENT LICENSE AGREEMENT Between Alliance for Sustainable Energy, LLC And [COMPANY NAME] This License Agreement (hereinafter "Agreement"), which shall be effective on the date it is executed by the last Party to sign (the "Effective Date") below, is between Alliance for Sustainable Energy, LLC (hereinafter "Alliance"), Management and Operating Contractor for the National Renewable Energy Laboratory (hereinafter "NREL") located at

  20. Non-exclusive patent license agreement between Alliance and company

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Page 1 of 19 NON-EXCLUSIVE PATENT LICENSE AGREEMENT Between Alliance for Sustainable Energy, LLC And [COMPANY NAME] This License Agreement (hereinafter "Agreement"), which shall be effective on the date it is executed by the last Party to sign (the "Effective Date"), below is between Alliance for Sustainable Energy, LLC (hereinafter "Alliance"), Management and Operating Contractor for the National Renewable Energy Laboratory (hereinafter "NREL") located

  1. NETL Partnership and Licensing Agreements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    A CRADA allows for joint research projects between NETL and either public or private ... An Intellectual Property License transfers NETL-owned IP from government sector to private ...

  2. Nuclear reactor characteristics and operational history

    Gasoline and Diesel Fuel Update (EIA)

    Application License Renewal Issued Extended Expiration Arkansas Nuclear One 1 PWR Babcock&Wilcox, Lower Loop 1011968 8171974 5202014 212000 6202001 5202034 Arkansas ...

  3. DOE Issues Request for Information for Richland Operations Office Richland Acquisitions – Post Fiscal Year 2018 Contract(s) Acquisition Planning

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center today issued a Sources Sought/Request for Information (RFI) seeking interested parties with specialized capabilities necessary to successfully perform all or a portion of the elements of scope for a potential upcoming competitive Environmental Management (EM) procurement(s) for the environmental cleanup projects and Hanford Site infrastructure and services at the Richland Operations Office (RL), hereafter referred to as “Richland Acquisitions – Post Fiscal Year 2018 Contract(s)” and to further determine whether or not all or a portion of the work can be set-aside for small and disadvantaged businesses.

  4. Cleanup of Nuclear Licensed Facility 57

    SciTech Connect (OSTI)

    Jeanjacques, Michel; Bremond, Marie Pierre; Marchand, Carole; Poyau, Cecile; Viallefont, Cecile; Gautier, Laurent; Masure, Frederic

    2008-01-15

    This summary describes the operations to clean up the equipment of the Nuclear Licensed Facility 57 (NLF 57). Due to the diversity of the research and development work carried out on the reprocessing of spent fuel in it, this installation is emblematic of many of the technical and organizational issues liable to be encountered in the final closure of nuclear facilities. The French atomic energy commission's center at Fontenay aux Roses (CEA-FAR) was created in 1946 to house pile ZOE. Laboratories for fuel cycle research were installed in existing buildings at the site. Work was later concentrated on spent fuel reprocessing, in a pilot workshop referred to as the 'Usine Pu'. In the early sixties, after the dismantling of these first generation facilities, a radiochemistry laboratory dedicated to research and development work on reprocessing was constructed, designated Building 18. During the same decade, more buildings were added: Building 54, storehouses and offices, Building 91, a hall and laboratories for chemical engineering research on natural and depleted uranium. Together, these three building constitute NLF 57. Building 18 architecture featured four similar modules. Each module had three levels: a sub-level consisting of technical galleries and rooms for the liquid effluent tanks, a ground floor and roof space in which the ventilation was installed. Offices, change rooms, four laboratories and a hall were situated on the ground floor. The shielded lines were installed in the laboratories and the halls. Construction of the building took place between 1959 and 1962, and its commissioning began in 1961. The research and development programs performed in NLF 57 related to studies of the reprocessing of spent fuel, including dry methods and the Purex process, techniques for the treatment of waste (vitrification, alpha waste decontamination, etc.) as well as studies and production of transuranic elements for industry and research. In addition to this work, the

  5. The Atomic Safety and Licensing Board Panel

    SciTech Connect (OSTI)

    1998-03-01

    Through the Atomic Energy Act, Congress made is possible for the public to get a full and fair hearing on civilian nuclear matters. Individuals who are directly affected by any licensing action involving a facility producing or utilizing nuclear materials may participate in a formal hearing, on the record, before independent judges on the Atomic Safety and Licensing Board Panel (ASLBP or Panel). Frequently, in deciding whether a license, permit, amendment, or extension should be granted to a particular applicant, the Panel members must be more than mere umpires. If appropriate, they are authorized to go beyond the issues the parties place before them in order to identify, explore, and resolve significant questions involving threats to the public health and safety that come to a board`s attention during the proceedings. This brochure explains the purpose of the panel. Also addressed are: type of hearing handled; method of public participation; formality of hearings; high-level waste; other panel responsibilities and litigation technology.

  6. NREL: Technology Transfer - Nonexclusive and Exclusive Licenses

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    sold utilizing the licensed technology. The fees and payments vary depending on the business model, market(s), and the number of patents licensed. Exclusive NREL grants an...

  7. intellectual property license | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    intellectual property license Intellectual Property License Agreements transfer NETL-owned intellectual property (IP) from the government to the private sector both exclusively and...

  8. Property:FERC License | Open Energy Information

    Open Energy Info (EERE)

    FERC License Jump to: navigation, search Property Name FERC License Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense&oldid610683...

  9. Issue: K

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issue: K Author: Mark D. Ivey Page 1 of 24 DR 6 / 30 / 2010 ES&H STANDARD OPERATING PROCEDURE (ES&H SOP) Title: ATMOSPHERIC RADIATION MEASUREMENT CLIMATE RESEARCH FACILITY/NORTH SLOPE OF ALASKA/ADJACENT ARCTIC OCEAN (ACRF/NSA/AAO) PROJECT OPERATING PLAN (U) Location: North Slope of Alaska and Adjacent Arctic Ocean Owners: Mark D Ivey, Department 6383, Manager Mark D Ivey, Department 6383, ACRF/NSA/AAO Site Project Manager and Site ES&H Coordinator Document Release or Change History:

  10. Safety Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Safety Orientation April, 2015 Atmospheric Radiation Measurement Climate Research Facility/ North Slope of Alaska/Adjacent Arctic Ocean (ACRF/NSA/AAO) Site Safety Orientation Purpose This document provides an overview and summary of safety issues and safe work practices associated with operations at the Atmospheric Radiation Measurement Climate Research Facility/North Slope of Alaska/Adjacent Arctic Ocean (ACRF/NSA/AAO) Sites. It is intended for site visitors as well as routine site

  11. Challenge # 3 … Operational Issues

    Broader source: Energy.gov (indexed) [DOE]

    knowledge gaps that need to be closed order for industry to establish the ... Kgh 697.6 715.2 669.7 690.1 684.1 652.1 421.1 Combustion Air Temperature C 116.7 45.5 ...

  12. Solar and Wind Contractor Licensing

    Broader source: Energy.gov [DOE]

    In June of 2014, SB 447 mandated that the Louisiana State Licencsing Board for Contractors develop new rules for solar contractors no later than January 1, 2015. Licensed contractors must be in c...

  13. Licensing Oppurtunities | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensing Oppurtunities The Ames Laboratory's Contract allows for Privately Funded Technology Transfer (PFTT). PFTT is a Contractor activity, which allows ISU to perform patenting and licensing activities for the Laboratory. The ISU Research Foundation (ISURF) and ISU's Office of Intellectual Property and Technology Transfer provides these services on behalf of the Laboratory. Under PFTT, the Laboratory, Contractor, and inventors share in any monetary success derived from DOE funded intellectual

  14. Licensing Technologies | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licensing Technologies Licensing Technologies New tack cloth leaves no sticky residue. A license is a means of transferring commercial rights for technologies developed at Y-12 to the private sector. A license authorizes a "licensee" to use a patent, copyright, trademark. A technology license can be the basis of a new product line, or even a new company. The technology transfer process can shortcircuit the lengthy and costly product development cycle, and provide the licensee with a

  15. intellectual property license | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    intellectual property license Intellectual Property License Agreements transfer NETL-owned intellectual property (IP) from the government to the private sector both exclusively and non-exclusively. NETL looks for licensing partners with a plan for technology development and marketing with a high probability for technology commercialization. Licensing partners should also plan to make the benefits of the licensed IP reasonably accessible to the public. Review the list of current NETL technology

  16. Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decision, July 1972 - June 1995

    SciTech Connect (OSTI)

    1996-04-01

    This is the seventh edition of the Nuclear Regulatory Commission (NRC) Staff Practice and Procedure Digest. It contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 1995 interpreting the NRC rules of practice in 10 CFR part 2.

  17. Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective

    SciTech Connect (OSTI)

    Watson, B.A.; Buckley, J.T.; Craig, C.M.

    2006-07-01

    Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in decommissioning planning, conduct of decommissioning operations, volumes of low- level radioactive waste disposed, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated their 10 CFR Part 50 license. Maine Yankee elected to obtain a general license under 10 CFR Part 50 for the ISFSI and reduce the physical site footprint to the ISFSI through a series of license amendments. While the NRC regulations are flexible and allow different approaches to ISFSI licensing there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, public input resulted in the licensee entering into an agreement with a concerned citizen group and resulted in State legislation that significantly lowered the dose limit below the NRC radiological criteria of 25 mrem (0.25 mSv) per year (yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs

  18. License Agreement Moves Promising Technology Into the Marketplace

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    License Agreement Moves Promising Technology Into the Marketplace For information contact: e:mail: Public Affairs Golden, Colo., February 13, 1998 — A new pretreatment process may give cities better options in dealing with a persistent environmental problem: disposing the tons of sludge biosolids generated every day by sewage treatment plants. The pretreatment process was developed at the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL), which recently issued a

  19. Environmental Standard Review Plan for the review of license renewal applications for nuclear power plants

    SciTech Connect (OSTI)

    O'Brien, J.; Kim, T.J.; Reynolds, S.

    1991-08-01

    The Environmental Standard Review Plan for the Review of License Applications for Nuclear Power Plants (ESRP-LR) is to be used by the NRC staff when performing environmental reviews of applications for the renewal of power reactor licenses. The use of the ESRP-LR provides a framework for the staff to determine whether or not environmental issues important to license renewal have been identified and the impacts evaluated and provides acceptance standards to help the reviewers comply with the National Environmental Policy Act.

  20. Regulatory issues for deep borehole plutonium disposition

    SciTech Connect (OSTI)

    Halsey, W.G.

    1995-03-01

    As a result of recent changes throughout the world, a substantial inventory of excess separated plutonium is expected to result from dismantlement of US nuclear weapons. The safe and secure management and eventual disposition of this plutonium, and of a similar inventory in Russia, is a high priority. A variety of options (both interim and permanent) are under consideration to manage this material. The permanent solutions can be categorized into two broad groups: direct disposal and utilization. The deep borehole disposition concept involves placing excess plutonium deep into old stable rock formations with little free water present. Issues of concern include the regulatory, statutory and policy status of such a facility, the availability of sites with desirable characteristics and the technologies required for drilling deep holes, characterizing them, emplacing excess plutonium and sealing the holes. This white paper discusses the regulatory issues. Regulatory issues concerning construction, operation and decommissioning of the surface facility do not appear to be controversial, with existing regulations providing adequate coverage. It is in the areas of siting, licensing and long term environmental protection that current regulations may be inappropriate. This is because many current regulations are by intent or by default specific to waste forms, facilities or missions significantly different from deep borehole disposition of excess weapons usable fissile material. It is expected that custom regulations can be evolved in the context of this mission.

  1. Registration/Licensing Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Registration/Licensing Resources Registration/Licensing Resources Federal agencies and certain state governments are required to acquire alternative fuel vehicles as part of the Energy Policy Act of 1992, though they are also entitled to choose a petroleum reduction path as an alternative to the mandate. Find registration/licensing resources below. Alternative Fuels Data Center: Laws and Incentives by State.

  2. T-564: Vulnerabilities in Citrix Licensing administration components

    Broader source: Energy.gov [DOE]

    The vulnerabilities impact all current versions of the Citrix Licensing Administration Console, formerly known as the License Management Console.

  3. Tritium Laboratory Karlsruhe: administrative and technical framework for isotope laboratory operation

    SciTech Connect (OSTI)

    Welte, S.; Besserer, U.; Osenberg, D.; Wendel, J.

    2015-03-15

    Originally licensed in 1993 the Tritium Laboratory Karlsruhe (TLK) is a unique pilot scale isotope laboratory focused on tritium handling and processing to conduct a variety of scientific experiments and development tasks in view of future fusion power plants. TLK currently operates 15 glove boxes of 125 m{sup 3} total volume in an experimental hall measuring nearly 1500 m{sup 2}. The tritium infrastructure, comprising of the tritium storage system, the tritium transfer system and the isotope separation system, is integrated into TLK as a closed loop system to supply tritium to the experiments. Having a license for handling of up to 40 g of tritium and a closed tritium processing loop, TLK is a unique institute in non-military tritium research. In order to fulfil all requirements regarding the license, a framework of regulations is applied as a basis for the operation of TLK, as well as the setup of new experiments and the design of components. This paper will give an overview on the framework of operation in view of licensing issues, as well as administrative and technical regulations mandatory to legally and reliably operate an isotope laboratory of this scale.

  4. Section 106 Consultation Between Federal Agencies and Indian Tribes Regarding Federal Permits, Licenses, and Assistance Questions and Answers (ACHP, 2008)

    Broader source: Energy.gov [DOE]

    This Advisory Council on Historic Preservation guidance uses a question-and-answer format to explain issues related to Section 106 consultation between federal agencies and Indian tribes related to permits, licenses, and assistance.

  5. Air cleaning issues with contaminated sites

    SciTech Connect (OSTI)

    Bellamy, R.R.

    1997-08-01

    The US Nuclear Regulatory Commission has developed a list of contaminated sites that warrant special USNRC attention because they pose unique or complex decommissioning issues. This list of radiologically contaminated sites is termed the Site Decommissioning Management Plan (SDMP), and was first issued in 1990. A site is placed on the SDMP list if it has; (1) Problems with the viability of the responsible organization (e.g., the licensee for the site is unable or unwilling to pay for the decommissioning); (2) Large amounts of soil contamination or unused settling ponds or burial grounds that may make the waste difficult to dispose of; (3) The long-term presence of contaminated, unused buildings; (4) A previously terminated license; or (5) Contaminated or potential contamination of the ground water from on-site wastes. In deciding whether to add a site to the SDMP list, the NRC also considers the projected length of time for decommissioning and the willingness of the responsible organization to complete the decommissioning in a timely manner. Since the list was established, 9 sites have been removed from the list, and the current SDMP list contains 47 sites in 11 states. The USNRC annually publishes NUREG-1444, {open_quotes}Site Decommissioning Management Plan{close_quotes}, which updates the status of each site. This paper will discuss the philosophical goals of the SDMP, then will concentrate on the regulatory requirements associated with air cleaning issues at the SDMP sites during characterization and remediation. Both effluent and worker protection issues will be discussed. For effluents, the source terms at sites will be characterized, and measurement techniques will be presented. Off-site dose impacts will be included. For worker protection issues, air sampling analyses will be presented in order to show how the workers are adequately protected and their doses measured to satisfy regulatory criteria during decontamination operations. 1 tab.

  6. License renewal demonstration program: NRC observations and lessons learned

    SciTech Connect (OSTI)

    Prato, R.J.; Kuo, P.T.; Newberry, S.F.

    1996-12-01

    This report summarizes the Nuclear Regulatory Commission staff`s observations and lessons learned from the five License Renewal Demonstration Program (LRDP) site visits performed by the staff from March 25, 1996, through August 16, 1996. The LRDP was a Nuclear Energy Institute (NEI) program intended to assess the effectiveness of the guidance provided by NEI 95-10, Revision 0, {open_quotes}Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule,{close_quotes} to implement the requirements of Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), {open_quotes}Requirements for Renewal of Operating Licenses for Nuclear Power Plants.{close_quotes} In general, NEI 95-10 appeared to contain the basic guidance needed for scoping, screening, identifying aging effects, developing aging management programs, and performing time-limited aging analyses. However, inconsistent implementation of this guidance in some areas was an indication that clarification of existing guidance and/or the inclusion-of some new guidance may be needed for applicants to develop a license renewal program that is consistent with the intent of the rule.

  7. NNWSI [Nevada Nuclear Waste Storage Investigation] strategy for repository licensing

    SciTech Connect (OSTI)

    Plodinec, M.J.

    1987-01-16

    The Nevada Nuclear Waste Storage Investigation (NNWSI) has developed a strategy to license a nuclear waste repository in tuff. This strategy, which is currently circulating in draft form within the Department of Energy`s Office of Civilian Radioactive Waste Management, has important implications for DWPF waste form qualification activities, design of the DWPF process, and DWPF operations. In this report, the strategy and its implications for the DWPF are presented. 2 refs.

  8. Public Comments on the proposed 10 CFR Part 51 rule for renewal of nuclear power plant operating licenses and supporting documents: Review of concerns and NRC staff response. Appendices

    SciTech Connect (OSTI)

    1996-05-01

    This volume contains several appendices. Appendix A contains the list of individuals and organizations providing comments at various stages of the rulemaking process. The names of commenters at the public meetings are listed in the order that they spoke at the meeting; those who submitted written comments are listed by docket number. Appendix B contains the summaries of comments made. Each comment summary is identified by a unique comment number. Appendix C presents the concerns and NRC staff responses. Each concern embodies one or more comments on similar or related issues. The associated comment numbers are referenced for each concern. The concerns are organized by topic areas. A three-letter identifier for the topic, followed by a number, is assigned to each concern.

  9. FERC Licensing Processes Matrix | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: FERC Licensing Processes MatrixPermittingRegulatory GuidanceGuideHandbook...

  10. Vermont Waste Transportation Permit and License Information ...

    Open Energy Info (EERE)

    Waste Transportation Permit and License Information Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Vermont...

  11. Recreational Technical Assistance in Hydropower Licensing | Open...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Recreational Technical Assistance in Hydropower LicensingPermittingRegulatory...

  12. Technologies licensed | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    facilities and large sporting venues, as well as for other Department of Energy sites. Sustainable Environment Technologies, LLC (SET), licensed the Access Rate Control System...

  13. Nuclear Power 2010 Program: Combined Construction and Operating...

    Broader source: Energy.gov (indexed) [DOE]

    Power 2010 (NP 2010) Construction and Operating LicenseDesign Certification (COLDC) Demonstration program together with the financial incentives provided by the Energy Policy Act...

  14. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1991

    SciTech Connect (OSTI)

    Not Available

    1992-11-01

    This 4th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to December 31, 1991, interpreting the NRC's Rules of Practice in 10 CFR Part 2.

  15. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1991. Digest 6, Revision 4

    SciTech Connect (OSTI)

    Not Available

    1992-11-01

    This 4th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to December 31, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  16. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest: Commission, Appeal Board and Licensing Board decisions, July 1972--March 1992

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    This 5th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1992, interpreting the NRC's Rules of Practice in 10 CFR Part 2.

  17. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board Decisions, July 1972--June 1971: Revision 2

    SciTech Connect (OSTI)

    Not Available

    1992-05-01

    This 2nd revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to June 30, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  18. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--March 1991: Revision 1

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    This revision of the sixth edition of the NRC Practice and Procedure Digest contains a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  19. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--September 1992: Digest No. 6, Revision No. 7

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    This 7th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to September 30, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  20. United States Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decisions, July 1972--June 1992: Digest 6, Revision 6

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This 6th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to June 30, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  1. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest: Commission, Appeal Board and Licensing Board decisions, July 1972--March 1992. Digest 6, Revision 5

    SciTech Connect (OSTI)

    Not Available

    1993-02-01

    This 5th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  2. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--September 1991: Digest 6, Revision 3

    SciTech Connect (OSTI)

    Not Available

    1992-08-01

    This 2nd revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to September 30, 1991, interpreting the NRC`s Rules of Pratice in 10 CFR Part 2.

  3. DOE Issues Request for Information for Richland Operations Office Richland Acquisitions – Post Fiscal Year 2018 Contract Acquisition Planning- Occupational Medical Services (OccMed)

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center today issued a Sources Sought/Request for Information (RFI) seeking interested parties with specialized capabilities necessary to successfully perform all or a portion of the elements of scope for the upcoming competitive Environmental Management (EM) procurement for the Hanford Site occupational medical services, hereafter referred to as “Richland Acquisitions – Post Fiscal Year 2018 OccMed Contract” and to further determine whether or not all or a portion of the work can be set-aside for small and disadvantaged businesses.

  4. Identification and Resolution of Safety Issues for the Advanced Integral Type PWR

    SciTech Connect (OSTI)

    Kim, Woong Sik; Jo, Jong Chull; Yune, Young Gill; Kim, Hho Jung

    2004-07-01

    This paper presents the interim results of a study on the identification and resolution of safety issues for the AIPWR licensing. The safety issues discussed in this paper include (1) policy issues for which decision-makings are needed for the procedural requirements of licensing system in the regulatory policy point of view, (2) technical issues for which either development of new requirements or amendment of some existing requirements is needed, or (3) other technical issues for which safety verifications are required. The study covers (a) the assessment of applicability of the issues identified from the previous studies to the case of the AIPWR, (b) identification of safety issues through analysis of the international experiences in the design and licensing of advanced reactors, and technical review of the AIPWR design, and (c) development of the resolutions of safety issues, and application of the resolutions to the amendment of regulatory requirements and the licensing review of the AIPWR. As the results of this study, a total of twenty eight safety issues was identified: fourteen issues from the previous studies, including the establishment of design safety goals; four issues from the foreign practices and experiences, including the risk-informed licensing; and ten issues by the AIPWR design review, including reliability of passive safety systems. Ten issues of them have been already resolved and the succeeding study is under way to resolve the remaining ones. (authors)

  5. Exclusive Patent License Agreement between Alliance and company

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    or indirectly by Alliance in the grant of a license to the Licensed Patents, from the United States of America, directly or indirectly without first complying with all...

  6. Non-exclusive patent license agreement between Alliance and company

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    or indirectly by Alliance in the grant of a license to the Licensed Patents, from the United States of America, directly or indirectly without first complying with all...

  7. Property:FERC License Application Date | Open Energy Information

    Open Energy Info (EERE)

    FERC License Application Date Jump to: navigation, search Property Name FERC License Application Date Property Type String Retrieved from "http:en.openei.orgw...

  8. Technology Test Drive: PNNL Offers Exploratory Licenses | Department...

    Office of Environmental Management (EM)

    Technology Test Drive: PNNL Offers Exploratory Licenses Technology Test Drive: PNNL Offers Exploratory Licenses May 10, 2016 - 11:59am Addthis News release from Pacific Northwest ...

  9. Energy Facility Licensing Process Developer's Guide | Open Energy...

    Open Energy Info (EERE)

    Licensing Process Developer's Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Energy Facility Licensing Process Developer's...

  10. Solar/Wind Contractor Licensing | Open Energy Information

    Open Energy Info (EERE)

    Licensing Louisiana InstallerContractor Photovoltaics Solar Water Heat Yes Tennessee Solar Panel Installation Specialty and Solar Thermal-Geothermal Licensing (Tennessee)...

  11. Title 50 CFR Part 221 Prescriptions in FERC Hydropower Licenses...

    Open Energy Info (EERE)

    in FERC Hydropower LicensesLegal Abstract Regulations governing Department of Commerce review of FERC hydropower license conditions under Federal Power Act. Published NA...

  12. ORNL Licenses Rare Earth Magnet Recycling Process to Momentum...

    Office of Environmental Management (EM)

    ORNL Licenses Rare Earth Magnet Recycling Process to Momentum Technologies ORNL Licenses ... Dallas-based Momentum Technologies is focused on extraction of rare earth elements and ...

  13. U-047: Siemens Automation License Manager Bugs Let Remote Users...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code U-047: Siemens Automation License Manager Bugs Let Remote Users Deny Service or...

  14. DOE Announces Yucca Mountain License Application Schedule | Department...

    Energy Savers [EERE]

    Yucca Mountain License Application Schedule DOE Announces Yucca Mountain License Application Schedule July 19, 2006 - 3:13pm Addthis New Director Ward Sproat Testifies on Revised ...

  15. NASA Partners License Nanotube Technology for Commercial Use...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NASA Partners License Nanotube Technology for Commercial Use (PR Newswire) External Link: http:www.prnewswire.comnews-releasesnasa-partners-license-nanotube-technolog... By ...

  16. Nuclear Safety Design Base for License Application (Technical...

    Office of Scientific and Technical Information (OSTI)

    Nuclear Safety Design Base for License Application Citation Details In-Document Search Title: Nuclear Safety Design Base for License Application You are accessing a document ...

  17. FERC Handbook for Hydroelectric Project Licensing and 5 MW Exemptions...

    Open Energy Info (EERE)

    Handbook for Hydroelectric Project Licensing and 5 MW Exemptions from Licensing Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  18. Sandia Energy - NuMAD License and Disclaimer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power Energy Conversion Efficiency Wind Energy Rotor Innovation Numerical Manufacturing And Design Tool (NuMAD) NuMAD License and Disclaimer NuMAD License and...

  19. Montana - Land Use License Application | Open Energy Information

    Open Energy Info (EERE)

    Land Use License Application Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Montana - Land Use License Application Author Montana Department of Natural...

  20. All Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AlumniLink » All Issues All Issues Bi-monthly publication connecting our alumni with news, information and former colleagues from the Lab. Archive - 2015 September July May March January Archive - 2014 November September June Publications 1663 Actinide Research Quarterly (ARQ) AlumniLink Publications Archive Connections National Security Science VISTAS

  1. Threatened and endangered species evaluation for 75 licensed commercial nuclear power generating plants

    SciTech Connect (OSTI)

    Sackschewsky, M.R.

    1997-03-01

    The Endangered Species Act (ESA) of 1973, as amended, and related implementing regulations of the jurisdictional federal agencies, the U.S. Departments of Commerce and Interior, at 50 CFR Part 17. 1, et seq., require that federal agencies ensure that any action authorized, funded, or carried out under their jurisdiction is not likely to jeopardize the continued existence of any threatened or endangered species or result in the destruction or adverse modification of critical habitats for such species. The issuance and maintenance of a federal license, such as a construction permit or operating license issued by the U.S. Nuclear Regulatory Commission (NRC) for a commercial nuclear power generating facility is a federal action under the jurisdiction of a federal agency, and is therefore subject to the provisions of the ESA. The U.S. Department of the Interior (through the Fish and Wildlife Service), and the U.S. Department of Commerce, share responsibility for administration of the ESA. The National Marine Fisheries Service (NMFS) deals with species that inhabit marine environments and anadromous fish, while the U.S. Fish and Wildlife Service (USFWS) is responsible for terrestrial and freshwater species and migratory birds. A species (or other distinct taxonomic unit such as subspecies, variety, and for vertebrates, distinct population units) may be classified for protection as `endangered` when it is in danger of extinction within the foreseeable future throughout all or a significant portion of its range. A `threatened` classification is provided to those animals and plants likely to become endangered within the foreseeable future throughout all or a significant portion of their ranges. As of February 1997, there were about 1067 species listed under the ESA in the United States. Additionally there were approximately 125 species currently proposed for listing as threatened or endangered, and another 183 species considered to be candidates for formal listing proposals.

  2. Licensed reactor nuclear safety criteria applicable to DOE reactors

    SciTech Connect (OSTI)

    Not Available

    1991-04-01

    The Department of Energy (DOE) Order DOE 5480.6, Safety of Department of Energy-Owned Nuclear Reactors, establishes reactor safety requirements to assure that reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that adequately protects health and safety and is in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. This document identifies nuclear safety criteria applied to NRC (Nuclear Regulatory Commission) licensed reactors. The titles of the chapters and sections of USNRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, Rev. 3, are used as the format for compiling the NRC criteria applied to the various areas of nuclear safety addressed in a safety analysis report for a nuclear reactor. In each section the criteria are compiled in four groups: (1) Code of Federal Regulations, (2) US NRC Regulatory Guides, SRP Branch Technical Positions and Appendices, (3) Codes and Standards, and (4) Supplemental Information. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor.

  3. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    using house July 6, 2012 Description There have been a lot of issues recently with NFS hangs on the gpint machines. The origin of the gpint hanging has been determined to be...

  4. Land Use License | Open Energy Information

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Land Use LicenseLegal Published NA Year Signed or Took Effect 2013 Legal Citation Not...

  5. Hydropower licensing: a case study of Massachusetts' streamlined procedure

    SciTech Connect (OSTI)

    Gardiner, P.

    1980-08-01

    Licensing procedures for hydroelectric projects in Massachusetts are enumerated, reviewed, and evaluated. (LCL)

  6. DEPARTMENT OF ENERGY NONEXCLUSIVE PATENT LICENSE APPLICATION | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy NONEXCLUSIVE PATENT LICENSE APPLICATION DEPARTMENT OF ENERGY NONEXCLUSIVE PATENT LICENSE APPLICATION It is the policy of the U.S. Department of Energy (DOE) to accord licensed on DOE-owned patents applications in appropriate circumstances to applicants with satisfactory plans for development and/or marketing of the invention. NONEXCLUSIVE PATENT LICENSE APPLICATION (16.18 KB) More Documents & Publications DEPARTMENT OF ENERGY EXCLUSIVE OR PARTIALLY EXCLUSIVE PATENT LICENSE

  7. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Open Issues Open Issues The /scratc3 performance degradation after GridRaid upgrade April 7, 2016 The Edison /scratch3 file system was upgraded to Grid Raid from MDRaid during the move to the CRT building (Dec, 2015). This upgrade was recommended by the vendors because it greatly enhances the drive rebuild time and write performance when compared to the traditional MDRaid that was deployed on Edison /scratch3 file system before the move (The /scratch1 and /scratch2 file systems are still in

  8. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Open Issues Open Issues runtime error message: "readControlMsg: System returned error Connection timed out on TCP socket fd" June 30, 2015 Symptom User jobs with sinlge or multiple apruns in a batch script may get this run time error: "readControlMsg: System returned error Connection timed out on TCP socket fd". This problem is intermittent, sometimes resubmit works. This error message started to appear after the Hopper OS upgrade to CLE52UP02 on March 11, 2015. Read the full

  9. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    March 2012 Resolved: Reports of Hanging Jobs on Hopper March 1, 2012 by Katie Antypas Issue: A number of users have reported intermittent large jobs hanging on Hopper. A job appears to start and then hangs shortly after producing no output. The job stops when the wall clock limit has been reached

  10. Summary and analysis of public comments on NUREG-1317: Regulatory options for nuclear plant license renewal: Final report

    SciTech Connect (OSTI)

    Ligon, D.M.; Seth, S.S.

    1989-03-01

    On August 29, 1988, the US Nuclear Regulatory Commission (NRC) issued an Advance Notice of Proposed Rulemaking on nuclear plant license renewal and solicited public comments on NUREG-1317, ''Regulatory Options for Nuclear Plant License Renewal.'' NUREG-1317 presents a discussion of fifteen topics involving technical, environmental, and procedural issues and poses a set of related questions. As part of its ongoing task for the NRC, The MITRE Corporation has summarized and analyzed the public comments received. Fifty-three written comments were received. Of these, 83 percent were from nuclear industry representatives; the remaining comments represented federal and state agencies, public interest groups, and a private citizen.

  11. President Issues

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    President Issues Executive Order on Alternative Fuels On December 13, 1996, President Clinton signed Exec- utive Order 13031, which calls on each Federal agency to develop and implement ways to meet the alternative fuel vehicle (AFV) acquisition requirements of the Energy Policy Act (EPAct) of 1992. The executive order requires each agency to submit detailed reports within 60 days of the signing of the order to the Office of Management and Budget detailing its compliance with the EPAct sections

  12. Cogeneration : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect (OSTI)

    Deshaye, Joyce; Bloomquist, R.Gordon

    1992-12-01

    This guidebook focuses on cogeneration development. It is one of a series of four guidebooks recently prepared to introduce the energy developer to the federal, state and local agencies that regulate energy facilities in Idaho, Montana, Oregon, and Washington (the Bonneville Power Administration Service Territory). It was prepared specifically to help cogeneration developers obtain the permits, licenses and approvals necessary to construct and operate a cogeneration facility. The regulations, agencies and policies described herein are subject to change. Changes are likely to occur whenever energy or a project becomes a political issue, a state legislature meets, a preexisting popular or valuable land use is thought threatened, elected and appointed officials change, and new directions are imposed on states and local governments by the federal government. Accordingly, cogeneration developers should verify and continuously monitor the status of laws and rules that might affect their plans. Developers are cautioned that the regulations described herein may only be a starting point on the road to obtaining all the necessary permits.

  13. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect (OSTI)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  14. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect (OSTI)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  15. Inspection of the Department`s export licensing process for dual-use and munitions commodities

    SciTech Connect (OSTI)

    Not Available

    1993-08-10

    The purpose of our inspection was to review the Department of Energy`s (Energy) export licensing process for dual-use and military (munitions) commodities subject to nuclear nonproliferation controls. Specifically, we reviewed Energy`s authorities, procedures, and policies pertaining to the export licensing process and examined procedures for safeguarding data transmitted between Energy and other agencies involved in the export licensing process. We also reviewed Energy`s role as a member of the Subgroup on Nuclear Export Coordination. Our review of the sample of 60 export cases did not find evidence to lead us to believe that Energy`s recommendations for these cases were inappropriate or incorrect. We identified, however, problems regarding management systems associated with the export license review process. We found that without documentation supporting export licensing decisions by the Export Control Operations Division (ECOD), we could not determine whether ECOD analysts considered all required criteria in their review of export cases referred to Energy. For example, we found that the ECOD did not retain records documenting the bases for its advice, recommendations, or decisions regarding its reviews of export license cases or revisions to lists of controlled commodities and, therefore, was not in compliance with certain provisions of the Export Administration Act, as amended, and Energy records management directives. Additionally, we found that the degree of compliance by Energy with the export licensing review criteria contained in the Export Administration Regulations and the Nuclear Non-Proliferation Act of 1978 could not be determined because ECOD did not retain records documenting the bases for its advice and recommendations on export cases.

  16. Kirkland gets license in hot Philippines area

    SciTech Connect (OSTI)

    Kirkland, A.S.

    1992-08-03

    This paper reports that Kirkland As, Oslo, has received a geophysical survey and exploration contract (GSEC) in a sizzling exploration and development theater off the Philippines. The license covers about 6,000 sq miles of undisputed waters, with depths mostly less than 300 ft, and lies in the Reed Bank area off Northwest Palawan Island, where several major oil and gas strikes have been made recently. Kirkland has 1 year in which to carry out its seismic work commitment. The terms of the GSEC then give an option to drill one well in a 6 month period. Once the results have been analyzed, the company can either drill another well or enter into a service contract for the license. Kirkland has a 65% share in the license, with the remainder split between Philippine companies Philodrill Corp., Beguet Mining Corp. subsidiary Petrofields, and Seafront Resources Corp. The Philippines is one of Kirkland's main areas of activity, the Kirkland Commercial Manager Ralph Baxter.

  17. Operational Issues at the Environmental Restoration Disposal...

    Office of Environmental Management (EM)

    of Engineering and Technology (EM-20) 17 June 2007 ... with real-time remote output. Similar systems are commonly used in ... 1-21. Refereed Conference Papers Benson, C. ...

  18. Summary - Operational Issues at the Environmental Restoration...

    Office of Environmental Management (EM)

    Restoration Disposal Facility(ERDF) at Hanford Why DOE-EM Did This Review The ERDF is a large- scale disposal facility authorized to receive waste from Hanford cleanup...

  19. Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 2011 "Unable to open kgni version file /sys/class/gemini/kgni0/version" error April 13, 2011 by Helen He Symptom: Dynamic executables built with compiler wrappers running directly on the external login nodes are getting the following error message: Read the full post Resolved -- Default version not shown in "module avail module_name" command April 13, 2011 by Helen He Symptom: The default software version is not shown when "module avail module_name" is issued.

  20. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391): Supplement No. 19

    SciTech Connect (OSTI)

    1995-11-01

    Supplement No. 19 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation with (1) additional information submitted by the applicant since Supplement No. 18 was issued, and (2) matters that the staff had under review when Supplement No. 18 was issued.

  1. Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 12

    SciTech Connect (OSTI)

    Tam, P.S.

    1993-10-01

    Supplement No. 12 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation of (1) additional information submitted by the applicant since Supplement No. 11 was issued, and (2) matters that the staff had under review when Supplement No. 11 was issued.

  2. Total System Performance Assessment-License Application Methods and Approach

    SciTech Connect (OSTI)

    J. McNeish

    2002-09-13

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issue (KTI) agreements, the ''Yucca Mountain Review Plan'' (CNWRA 2002 [158449]), and 10 CFR Part 63. This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are utilized in this document.

  3. Total System Performance Assessment - License Application Methods and Approach

    SciTech Connect (OSTI)

    J. McNeish

    2003-12-08

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

  4. Advanced Reactor Licensing: Experience with Digital I&C Technology in Evolutionary Plants

    SciTech Connect (OSTI)

    Wood, RT

    2004-09-27

    This report presents the findings from a study of experience with digital instrumentation and controls (I&C) technology in evolutionary nuclear power plants. In particular, this study evaluated regulatory approaches employed by the international nuclear power community for licensing advanced l&C systems and identified lessons learned. The report (1) gives an overview of the modern l&C technologies employed at numerous evolutionary nuclear power plants, (2) identifies performance experience derived from those applications, (3) discusses regulatory processes employed and issues that have arisen, (4) captures lessons learned from performance and regulatory experience, (5) suggests anticipated issues that may arise from international near-term deployment of reactor concepts, and (6) offers conclusions and recommendations for potential activities to support advanced reactor licensing in the United States.

  5. Known Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NNSA's national security missions | National Nuclear Security Administration | (NNSA) Klotz visits Y-12 to see progress on new projects and ongoing work on NNSA's national security missions Tuesday, June 7, 2016 - 11:48am Last week, NNSA Administrator Lt. Gen. Frank Klotz (Ret.) visited the Y-12 National Security Complex to check on the status of ongoing projects like the Uranium Processing Facility as well as the site's continuing uranium operations. He also met with the Region 2 volunteers

  6. ARS 41-1072 Licensing Time Frames | Open Energy Information

    Open Energy Info (EERE)

    1-1072 Licensing Time Frames Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: ARS 41-1072 Licensing Time FramesLegal Abstract...

  7. NASA Partners License Nanotube Technology for Commercial Use (PR Newswire)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    | Jefferson Lab NASA Partners License Nanotube Technology for Commercial Use (PR Newswire) External Link: http://www.prnewswire.com/news-releases/nasa-partners-license-nanotube-technolog... By jlab_admin on Tue, 2012-05-0

  8. Title 18 CFR 5 Integrated License Application Process | Open...

    Open Energy Info (EERE)

    5 Integrated License Application Process Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 CFR 5 Integrated License...

  9. CCC Federal License and Permit List | Open Energy Information

    Open Energy Info (EERE)

    CCC Federal License and Permit List Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: CCC Federal License and Permit ListLegal Abstract...

  10. Review of safety guidelines and licensing procedures applicable in Italy with regard to fusion machines

    SciTech Connect (OSTI)

    Sgalambro, G.

    1993-06-01

    A consistent set of general safety criteria has been set up in Italy dealing with fusion machines, considering also the most recent recommendations issued by ICRP. The paper gives a short discussion of the more safety relevant aspects in the design of fusion machines starting from the consideration of the applicable dose limits. The procedure for the licensing of fusion machines is presented in the second part of the paper.

  11. Nuclear Regulatory Commission Regulatory and Licensing Matters | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a

  12. Laboratory Licenses Hydrogen Sensor Technology - News Releases | NREL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Licenses Hydrogen Sensor Technology Nuclear Filter Technology Awarded Licenses for Fiber Optic Hydrogen Sensor February 23, 2006 Golden, Colo. - The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) today announced that Nuclear Filter Technology (NucFil) has been awarded licenses to manufacture Fiber Optic Hydrogen Sensors. The licenses, together with a Cooperative Research and Development Agreement (CRADA), allow NucFil to work with scientists and engineers at

  13. Professional Engineer Licenses are Symbol of Achievement for Employees |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Professional Engineer Licenses are Symbol of Achievement for Employees Professional Engineer Licenses are Symbol of Achievement for Employees July 14, 2016 - 12:10pm Addthis ORP employees Kelly Ebert, left, and Anne McCartney, recently earned their professional engineer licenses from the state of California. ORP employees Kelly Ebert, left, and Anne McCartney, recently earned their professional engineer licenses from the state of California. RICHLAND, Wash. - Two EM

  14. DEPARTMENT OF ENERGY EXCLUSIVE OR PARTIALLY EXCLUSIVE PATENT LICENSE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    APPLICATION | Department of Energy EXCLUSIVE OR PARTIALLY EXCLUSIVE PATENT LICENSE APPLICATION DEPARTMENT OF ENERGY EXCLUSIVE OR PARTIALLY EXCLUSIVE PATENT LICENSE APPLICATION It is the policy of the U.S. Department of Energy (DOE) to accord licenses on DOE-owned patents and patent applications in appropriate circumstances to applicants with satisfactory plans for development and/or marketing of the invention. EXCLUSIVE OR PARTIALLY EXCLUSIVE PATENT LICENSE APPLICATION (21.33 KB) More

  15. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Energy Savers [EERE]

    ... Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and ...

  16. Human Factors Aspects of Operating Small Reactors

    SciTech Connect (OSTI)

    OHara, J.M.; Higgins, J.; Deem, R.; Xing, J.; DAgostino, A.

    2010-11-07

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. They are considering small modular reactors (SMRs) as one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants, and so may require a concept of operations (ConOps) that also is different. The U.S. Nuclear Regulatory Commission (NRC) has begun examining the human factors engineering- (HFE) and ConOps- aspects of SMRs; if needed, they will formulate guidance to support SMR licensing reviews. We developed a ConOps model, consisting of the following dimensions: Plant mission; roles and responsibilities of all agents; staffing, qualifications, and training; management of normal operations; management of off-normal conditions and emergencies; and, management of maintenance and modifications. We are reviewing information on SMR design to obtain data about each of these dimensions, and have identified several preliminary issues. In addition, we are obtaining operations-related information from other types of multi-module systems, such as refineries, to identify lessons learned from their experience. Here, we describe the project's methodology and our preliminary findings.

  17. The Role of the Engineered Barrier System in Safety Cases for Geological Radioactive Waste Repoitories: An NEA Initiaive in Co-Operations with the EC, Process Issues and Modeling

    SciTech Connect (OSTI)

    D.G. Bennett; A.J. Hooper; S. Voinis; H. Umeki; A.V. Luik; J. Alonso

    2006-02-07

    The Integration Group for the Safety Case (IGSC) of the Nuclear Energy Agency (NEA) Radioactive Waste Management Committee in co-operation with the European Commission (EC) is conducting a project to develop a greater understanding of how to achieve the necessary integration for successful design, construction, testing, modeling, and assessment of engineered barrier systems. The project also seeks to clarify the role that the EBS plays in assuring the overall safety of a repository. A framework for the EBS Project is provided by a series of workshops that allow discussion of the wide range of activities necessary for the design, assessment and optimization of the EBS, and the integration of this information into the safety case. The topics of this series of workshops have been planned so that the EBS project will work progressively through the main aspects comprising one cycle of the design and optimization process. This paper seeks to communicate key results from the EBS project to a wider audience. The paper focuses on two topics discussed at the workshops: process issues and the role of modeling.

  18. Sensor network based vehicle classification and license plate identification system

    SciTech Connect (OSTI)

    Frigo, Janette Rose; Brennan, Sean M; Rosten, Edward J; Raby, Eric Y; Kulathumani, Vinod K

    2009-01-01

    Typically, for energy efficiency and scalability purposes, sensor networks have been used in the context of environmental and traffic monitoring applications in which operations at the sensor level are not computationally intensive. But increasingly, sensor network applications require data and compute intensive sensors such video cameras and microphones. In this paper, we describe the design and implementation of two such systems: a vehicle classifier based on acoustic signals and a license plate identification system using a camera. The systems are implemented in an energy-efficient manner to the extent possible using commercially available hardware, the Mica motes and the Stargate platform. Our experience in designing these systems leads us to consider an alternate more flexible, modular, low-power mote architecture that uses a combination of FPGAs, specialized embedded processing units and sensor data acquisition systems.

  19. NRC antitrust licensing actions, 1978--1996

    SciTech Connect (OSTI)

    Mayer, S.J.; Simpson, J.J.

    1997-09-01

    NUREG-0447, Antitrust Review of Nuclear Power Plants, was published in May 1978 and includes a compilation and discussion of U.S. Nuclear Regulatory Commission (NRC) proceedings and activity involving the NRC`s competitive review program through February 1978, NUREG-0447 is an update of an earlier discussion of the NRC`s antitrust review of nuclear power plants, NR-AIG-001, The US Nuclear Regulatory Commission`s Antitrust Review of Nuclear Power Plants: The Conditioning of Licenses, which reviewed the Commission`s antitrust review function from its inception in December 1970 through April 1976. This report summarizes the support provided to NRC staff in updating the compilation of the NRC`s antitrust licensing review activities for commercial nuclear power plants that have occurred since February 1978. 4 refs., 4 tabs.

  20. TEAM 1 Drivers License.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    I Core Status: new users must complete 2 training sessions and pass a sample exchange exam to work independently during Core sessions (regular work hours). Flex Status: core users must complete 5 Core sessions and pass a driving test to work during Flex sessions (evening and weekend hours). All TEAM I scheduling must be coordinated through Peter Ercius at PErcius@lbl.gov. You may only be assigned two sessions per month. CORE LICENSE TEST Safety  Understand emergency shutdown procedure 

  1. Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository

    SciTech Connect (OSTI)

    Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

    2002-02-26

    If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required

  2. Testing, licensing, and code requirements for seismic isolation systems (for nuclear power plants)

    SciTech Connect (OSTI)

    Seidensticker, R.W.

    1987-01-01

    The use of seismic isolation as an earthquake hazard mitigation strategy for nuclear reactor power plants is rapidly receiving interest throughout the world. Seismic isolation has already been used on at least two French PWR plants, was to have been used for plants to be built in Iran, and is under serious consideration for advanced LMR plants (in the US, UK, France, and Japan). In addition, there is a growing use of seismic isolation throughout the world for other critical facilities such as hospitals, emergency facilities, buildings with very high-cost equipment (e.g., computers) and as a strategy to reduce loss of life and expensive equipment in earthquakes. Such a design approach is in complete contrast to the conventional seismic design strategy in which the structure and components are provided with sufficient strength and ductility to resist the earthquake forces and to prevent structural collapses or failure. The use of seismic isolation for nuclear plants can, therefore, be expected to be a significant licensing issue. For isolation, the licensing process must shift away in large measure from the superstructure and concentrate on the behavior of the seismic isolation system. This paper is not intended to promote the advantages of seismic isolation system, but to explore in some detail those technical issues which must be satisfactorily addressed to achieve full licensability of the use of seismic isolation as a viable, attractive and economical alternative to current traditional design approaches. Special problems and topics associated with testing and codes and standards development are addressed. A positive program for approach or strategy to secure licensing is presented.

  3. Photovoltaics at DOE's National Renewable Energy Laboratory License |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Photovoltaics at DOE's National Renewable Energy Laboratory License Photovoltaics at DOE's National Renewable Energy Laboratory License Document describes a sample land use agreement surrounding the National Renewable Energy Laboratory Science and Technology Facility roof-top photovoltaic (PV) power purchase agreement (PPA). Download the photovoltaics at DOE's National Renewable Energy Laboratory license document. (256.08 KB) More Documents & Publications USA RS

  4. DOE Marks Milestone in Submitting Yucca Mountain License Application |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Milestone in Submitting Yucca Mountain License Application DOE Marks Milestone in Submitting Yucca Mountain License Application June 3, 2008 - 12:51pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced submittal of a license application (LA) to the U.S. Nuclear Regulatory Commission (NRC) seeking authorization to construct America's first repository for spent nuclear fuel and high-level radioactive waste at Yucca Mountain, Nevada. The 8,600 page

  5. Department of Energy Files Motion to Withdraw Yucca Mountain License

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Application | Department of Energy Files Motion to Withdraw Yucca Mountain License Application Department of Energy Files Motion to Withdraw Yucca Mountain License Application March 3, 2010 - 12:00am Addthis WASHINGTON, D.C. - The U.S. Department of Energy today filed a motion with the Nuclear Regulatory Commission to withdraw the license application for a high-level nuclear waste repository at Yucca Mountain with prejudice. "President Obama is fully committed to ensuring that the

  6. Department of Energy Issues Draft Request for Proposals for Argonne...

    Energy Savers [EERE]

    ... Seeking a Contractor to Manage and Operate its Ames Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory

  7. NRC Licensing Strategy Development for the NGNP

    SciTech Connect (OSTI)

    Mark R. Holbrook; Trevor Cook

    2008-09-01

    The Next Generation Nuclear Plant (NGNP) project will provide the basis for commercialization of a new generation of advanced nuclear plants that utilize hightemperature gas-cooled reactor (HTGR) technology. The inherently safe HTGR design characteristics can be utilized to supply high-temperature process heat, co-generated electricity, and/or hydrogen for a number of industrial applications (e.g., petrochemical processes). Completion of the NGNP will result in a facility that demonstrates the safety and economics of the design, the commercial industrial potential of the technology, and the viability of the licensing strategy.

  8. Property:FERC License Issuance Date | Open Energy Information

    Open Energy Info (EERE)

    Issuance Date Jump to: navigation, search Property Name FERC License Issuance Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense...

  9. Vermont Permit and License Information: NPDES Stormwater General...

    Open Energy Info (EERE)

    General Permits for Construction SitesLegal Abstract Permit and licensing information for Clean Water Act 304 National Pollution Discharge Elimination System (NPDES) Permits for...

  10. Title 18 CFR 4 Licenses, Permits, Exemptions, and Determination...

    Open Energy Info (EERE)

    for licenses, permits, exemptions, and determination of project costs associated with conservation of power and water resources. Published NA Year Signed or Took Effect 1979...

  11. NREL: Technology Transfer - New Energy License Encourages Investment...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    New Energy License Encourages Investment in Green Technologies August 5, 2015 The Energy Department's National Renewable Energy Laboratory (NREL) has developed a new technology ...

  12. FERC Hydropower Licensing and Endangered Species - A Guide for...

    Open Energy Info (EERE)

    FERC Hydropower Licensing and Endangered Species - A Guide for Applicants, Contractors, and Staff Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  13. Hydropower Licensing and Endangered Species A Guide for Applicants...

    Open Energy Info (EERE)

    Hydropower Licensing and Endangered Species A Guide for Applicants, Contractors, and Staff Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Hydropower...

  14. FERC Handbook for Hydroelectric Filings other than Licenses and...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: FERC Handbook for Hydroelectric Filings other than Licenses and...

  15. FERC Hydroelectric Project Handbook for Filings other than Licenses...

    Open Energy Info (EERE)

    Hydroelectric Project Handbook for Filings other than Licenses and Exemptions Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  16. Guidelines to Consider for Participating in the Alternative Licensing...

    Open Energy Info (EERE)

    to Consider for Participating in the Alternative Licensing Process Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Guide...

  17. FERC Hydropower Licensing Guidelines webpage | Open Energy Information

    Open Energy Info (EERE)

    Guidelines webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: FERC Hydropower Licensing Guidelines webpage Abstract This webpage provides...

  18. UDOT - Statewide Utility License Agreements | Open Energy Information

    Open Energy Info (EERE)

    UDOT, 2013 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for UDOT - Statewide Utility License Agreements Citation UDOT. UDOT - Statewide...

  19. 18 CFR 5: Integrated License Application Process | Open Energy...

    Open Energy Info (EERE)

    5: Integrated License Application Process Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: 18 CFR 5:...

  20. DOE Grant Recipients Technologies Available for Licensing - Energy...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Patent Search Success Stories News Events DOE Grant Recipients Technologies Available for Licensing In addition to National Laboratory research, the Department of Energy (DOE)...

  1. No Open Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Problems » No Open Issues No Open Issues There are currently no open issues with Euclid. Subscribe via RSS Subscribe Browse by Date January 2016 Last edited: 2011-03-15 10:01:46

  2. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3070)

    SciTech Connect (OSTI)

    Zeitoun, A.

    1994-08-01

    This two-volume Final Environmental Impact Statement (FEIS) was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA). Volume 1 contains the assessment of the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana, by Louisiana Energy Services, LP. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are construction, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning (D&D)- of the site. Issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment. The FEIS supports issuance of a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility.

  3. Seismic Analysis Issues in Design Certification Applications for New Reactors

    SciTech Connect (OSTI)

    Miranda, M.; Morante, R.; Xu, J.

    2011-07-17

    The licensing framework established by the U.S. Nuclear Regulatory Commission under Title 10 of the Code of Federal Regulations (10 CFR) Part 52, “Licenses, Certifications, and Approvals for Nuclear Power Plants,” provides requirements for standard design certifications (DCs) and combined license (COL) applications. The intent of this process is the early reso- lution of safety issues at the DC application stage. Subsequent COL applications may incorporate a DC by reference. Thus, the COL review will not reconsider safety issues resolved during the DC process. However, a COL application that incorporates a DC by reference must demonstrate that relevant site-specific de- sign parameters are within the bounds postulated by the DC, and any departures from the DC need to be justified. This paper provides an overview of several seismic analysis issues encountered during a review of recent DC applications under the 10 CFR Part 52 process, in which the authors have participated as part of the safety review effort.

  4. Project Analysis Standard Operating Procedure

    Office of Environmental Management (EM)

    Standard Operating Procedure (EPASOP) Issued by Office of Acquisition and Project Management MA-63 March 12, 2014 DEPARTMENT OF ENERGY Office of Acquisition and Project...

  5. Issues evaluation process at Rocky Flats Plant

    SciTech Connect (OSTI)

    Smith, L.C.

    1992-04-16

    This report describes the issues evaluation process for Rocky Flats Plant as established in July 1990. The issues evaluation process was initiated February 27, 1990 with a Charter and Process Overview for short-term implementation. The purpose of the process was to determine the projects required for completion before the Phased Resumption of Plutonium Operations. To determine which projects were required, the issues evaluation process and emphasized risk mitigation, based on a ranking system. The purpose of this report is to document the early design of the issues evaluation process to record the methodologies used that continue as the basis for the ongoing Issues Management Program at Rocky Flats Plant.

  6. Web-based training related to NRC staff review of dose modeling aspects of license termination and decommissioning plans.

    SciTech Connect (OSTI)

    LePoire, D.; Arnish, J.; Cheng, J. J.; Kamboj, S.; Richmond, P.; Chen, S. Y.; Barr, C.; McKenney, C.; Environmental Science Division; NRC

    2007-01-01

    NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course is being developed in 2006 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The training course consists of the core and advanced modules tailored to specific NRC job functions. Topics for individual modules include identifying the characteristics of simple and complex sites, identifying when outside expertise or consultation is needed, demonstrating how to conduct acceptance and technical reviews of dose modeling, and providing details regarding the level of justification needed for realistic scenarios for both dose modeling and derivation of DCGLs. Various methods of applying probabilistic uncertainty analysis to demonstrate compliance with dose-based requirements are presented. These approaches include: (1) modeling the pathways of radiological exposure and estimating doses to receptors from a combination of contaminated media and radionuclides, and (2) using probabilistic analysis to determine an appropriate set of input parameters to develop derived concentration guideline limits or DCGLs (DCGLs are media- and nuclide-specific concentration limits that will meet dose-based, license termination rule criteria found in 10 CFR Part 20, Subpart E). Calculation of operational (field) DCGL's from media- and nuclide-specific DCGLs and use of operational DCGLs in conducting

  7. Web-based training related to NRC staff review of dose modeling aspects of license termination and decommissioning plans

    SciTech Connect (OSTI)

    LePoire, D.; Arnish, J.; Cheng, J.J.; Kamboj, S.; Richmond, P.; Chen, S.Y.; Barr, C.; McKenney, C.

    2007-07-01

    NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course is being developed in 2006 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The training course consists of the core and advanced modules tailored to specific NRC job functions. Topics for individual modules include identifying the characteristics of simple and complex sites, identifying when outside expertise or consultation is needed, demonstrating how to conduct acceptance and technical reviews of dose modeling, and providing details regarding the level of justification needed for realistic scenarios for both dose modeling and derivation of DCGLs. Various methods of applying probabilistic uncertainty analysis to demonstrate compliance with dose-based requirements are presented. These approaches include 1) modeling the pathways of radiological exposure and estimating doses to receptors from a combination of contaminated media and radionuclides, and 2) using probabilistic analysis to determine an appropriate set of input parameters to develop derived concentration guideline limits or DCGLs (DCGLs are media- and nuclide-specific concentration limits that will meet dose-based, license termination rule criteria found in 10 CFR Part 20, Subpart E). Calculation of operational (field) DCGL's from media- and nuclide-specific DCGLs and use of operational DCGLs in conducting

  8. LICENSE HISTORY MO.8 Petrolite Corporation, St. Louis

    Office of Legacy Management (LM)

    LICENSE HISTORY MO.8 Petrolite Corporation, St. Louis 07,16/93 l See attached Document and Pile Sumnary for MO.8 l License History: l 24-10452-01, 30-051175, 08/13/79. Loose H-3, I-131, P-32. l 24-10452-1, 10/30/64. K66 R. R. Annand et al Multiple. . 70-621, 12-15-61, SNM license for 0.5 kg. of U-235, 93% enriched as a fuel loading and star-up ~curce for Webster Groves, Missouri reactor. l Discussion: Historical documents for this site are limited. The only information available on work done

  9. Welcome to this Issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Welcome National Security Science Latest Issue:April 2016 past issues All Issues » submit Welcome to this Issue Los Alamos National Laboratory has been at the forefront of high explosives research since the Manhattan Project, says Bob Webster, Principal Associate Director, Weapons Programs. March 22, 2016 Welcome to this Issue Bob Webster (Photo: Los Alamos) Contact Managing Editor Clay Dillingham Email Here's to another year of noteworthy accomplishments and continued excellence in 2016.

  10. Past Issues | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Inquiry Magazine Past Issues To view past issues of Inquiry magazine, click on the links below. Inquiry 2015, Issue 1 Inquiry 2014, Issue 2 Inquiry 2014, Issue 1 Image Inquiry 2013, Issue 2 Image Inquiry 2013, Issue 1 Image Inquiry 2012. Issue 2 Image Inquiry 2012, Issue 1 Image Inquiry 2011, Issue 2 Image Inquiry 2011, Issue 1 Image Inquiry 2010, Issue 2 Image Inquiry 2010, Issue 1 Inq10-1cover.jpg

  11. United States Nuclear Regulatory Commission staff practice and procedure digest. Commission, Appeal Board and Licensing Board decisions, July 1972-September 1985. Digest No. 4, Revision No. 1

    SciTech Connect (OSTI)

    Not Available

    1986-04-01

    This Revision 1 of the fourth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to September 30, 1985 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 1 replaces earlier editions and supplements and includes appropriate changes reflecting the admendments to the Rules of Practice effective through September 20, 1985.

  12. United States Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board decisions, July 1972--December 1990

    SciTech Connect (OSTI)

    Not Available

    1991-12-01

    This sixth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to December 31, 1990 interpreting the NRC`s Rules of Practice in 10 CFR Part 2. This sixth edition replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through December 31, 1990.

  13. 16 USC 799 License duration, conditions, revocation, alteration...

    Open Energy Info (EERE)

    9 License duration, conditions, revocation, alteration, or surrender Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: 16 USC 799...

  14. US Fish and Wildlife Service Hydropower Licensing webpage | Open...

    Open Energy Info (EERE)

    US Fish and Wildlife Service Hydropower Licensing webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: US Fish and Wildlife Service Hydropower...

  15. ENERGY COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE

    Office of Legacy Management (LM)

    ... MATERIAL LICENSE . Pursuant to the Atomic Energy Act of 1954, and Title 10, Code of ... specified in Section 183 of the Atotic Energy Act of 1954 and is subject to all ...

  16. 33 USC 1341 Permits and Licenses - Certification | Open Energy...

    Open Energy Info (EERE)

    1341 Permits and Licenses - CertificationLegal Published NA Year Signed or Took Effect 1977 Legal Citation 33 USC 1341 (1977) DOI Not Provided Check for DOI availability: http:...

  17. ORNL Licenses Rare Earth Magnet Recycling Process to Momentum Technologies

    Broader source: Energy.gov [DOE]

    The Department of Energy’s Oak Ridge National Laboratory and Momentum Technologies have signed a non-exclusive licensing agreement for an ORNL process designed to recover rare earth magnets from used computer hard drives.

  18. Title 16 USC 2705 Simplified and Expeditious Licensing Procedures...

    Open Energy Info (EERE)

    2705 Simplified and Expeditious Licensing Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 USC 2705 Simplified...

  19. Microsoft Word - Webdam_online_endusers_licensing_agreement_final...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    P D c LAWRENCE BERKELEY NATIONAL LAB END USER LICENSE AGREEMENT FOR SELECTED IMAGES FOR NON-COMMERCIAL USE Image title and description selected from http:photos.lbl.gov...

  20. NREL Model Licensed to Improve Accuracy of Battery Simulations - News

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Releases | NREL Model Licensed to Improve Accuracy of Battery Simulations January 14, 2014 The Energy Department's National Renewable Energy Laboratory (NREL) has licensed its Equivalent Circuit Battery Model to software developer ThermoAnalytics for use in its recently updated RadTherm software package. The model is a part of the Battery Module within RadTherm, which is used by engineers to simulate the performance of battery cells and optimize multi-cell pack designs. Before the addition

  1. First License for a CMI Invention | Critical Materials Institute

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    First License for a CMI Invention diagram of membrane solvent extraction system developed by CMI researchers Diagram of membrane solvent extraction system developed by CMI researchers at ORNL and INL. The first license for a CMI invention was granted for a recycling process developed by CMI researchers at Oak Ridge National Laboratory and Idaho National Laboratory. They have applied for a patent for "Membrane Solvent Extraction for Rare Earth Separations." Official news release from

  2. DOE Signs Advanced Enrichment Technology License and Facility Lease |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Advanced Enrichment Technology License and Facility Lease DOE Signs Advanced Enrichment Technology License and Facility Lease December 8, 2006 - 9:34am Addthis Announces Agreements with USEC Enabling Deployment of Advanced Domestic Technology for Uranium Enrichment WASHINGTON, DC - U.S. Secretary of Energy Samuel W. Bodman today announced the signing of a lease agreement with the United States Enrichment Corporation, Inc. (USEC) for their use of the Department's gas

  3. Lab grants Decision Sciences Corporation exclusive commercial license for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    muon tomography Muon tomography license Lab grants Decision Sciences Corporation exclusive commercial license for muon tomography Muon tomography uses naturally occurring cosmic-ray muons to detect and identify concealed nuclear threat materials based on their atomic number and density. October 7, 2008 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from

  4. Front Burner- Issue 15

    Broader source: Energy.gov [DOE]

    The Cybersecurity Front Burner Issue No. 15 addresses the DOE eSCRM Program and Secure Online Shopping.

  5. Connections: All Issues

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Connections Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: September 1, 2016 all issues All Issues » submit Community Connections Monthly news and opportunities for the Laboratory's neighbors and friends, with a primary focus on economic development, education and community giving. All Issues Connections Newsletter September 2016 September 2016 Great opportunity for Native American-owned businesses; 900 backpacks donated to local

  6. Front Burner- Issue 14

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Cybersecurity Front Burner Issue No. 14 highlights the 2013 National Cybersecurity Awareness Month (NCSAM) Campaign and Phishing Scams.

  7. Enforcement Guidance Supplement 00-03: Specific Issues on Applicabilit...

    Office of Environmental Management (EM)

    00-03: Specific Issues on Applicability of 10 CFR 830 Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of 10 CFR 830 Section 1.3 of the Operational Procedure...

  8. The role of non-destructive assay in support of the exemption of solid waste from nuclear licensed sites

    SciTech Connect (OSTI)

    Fisher, Alan; Adsley, Ian; Green, Tommy

    2007-07-01

    Available in abstract form only. Full text of publication follows: Nuclear Site License Holders within the United Kingdom are increasingly re-examining the options available for disposal of solid waste produced during routine operations and decommissioning activities. The incentives to do so include: 'Compliance with the requirement to minimise radioactive waste, as stipulated in Disposal Authorisations issued by the Environment Agency' Reducing the burden on the UK Low Level Waste Repository (LLWR)' Achieving cost savings on waste management, by avoiding expensive conditioning, transport and disposal costs for certain wastes. Wastes may be exempted from regulation under the Radioactive Substances Act, 1993 (RSA 93) provided they comply with the conditions laid out in the relevant Exemption Orders. In effect, they may be legally disposed as if they were non-radioactive waste. A national Code of Practice on Clearance and Exemption Principles, Processes and Practices was introduced in 2005 to clarify the requirements of these Exemption Orders and provide guidance on their practical application. In order to demonstrate compliance with these Exemption Orders, it is essential to have good knowledge of the items' history and their potential for contamination. Monitoring is frequently used as definitive evidence that the radioactivity content of waste items does not exceed limits proscribed in the relevant Exemption Orders. The practicalities of monitoring require careful consideration in order to achieve meaningful results and be capable of achieving the low specific activity limits quoted in the Exemption Orders. The Cross Industry Assay Working Group is a national collection of non-destructive assay specialists from a range of companies, which meets regularly to discuss challenges relating to the assay of all categories of waste. In this paper, the Group presents examples of how NDA techniques are being used to support the exemption of waste items. (authors)

  9. PRECLOSURE CONSEQUENCE ANALYSES FOR LICENSE APPLICATION

    SciTech Connect (OSTI)

    S. Tsai

    2005-01-12

    Radiological consequence analyses are performed for potential releases from normal operations in surface and subsurface facilities and from Category 1 and Category 2 event sequences during the preclosure period. Surface releases from normal repository operations are primarily from radionuclides released from opening a transportation cask during dry transfer operations of spent nuclear fuel (SNF) in Dry Transfer Facility 1 (DTF 1), Dry Transfer Facility 2 (DTF 2), the Canister Handling facility (CHF), or the Fuel Handling Facility (FHF). Subsurface releases from normal repository operations are from resuspension of waste package surface contamination and neutron activation of ventilated air and silica dust from host rock in the emplacement drifts. The purpose of this calculation is to demonstrate that the preclosure performance objectives, specified in 10 CFR 63.111(a) and 10 CFR 63.111(b), have been met for the proposed design and operations in the geologic repository operations area. Preclosure performance objectives are discussed in Section 6.2.3 and are summarized in Tables 1 and 2.

  10. Facility Operations and User Support | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Facility Operations and User Support This sub-program provides both necessary physical facility and operational support for reliable, cross-lab production computing and storage environments as well as a suite of user services for effective use of ASC tri-lab computing resources. The scope of the facility operations includes planning, integration and deployment, continuing product support, software license and maintenance fees, procurement of operational equipment and

  11. Reverse licensing: international technology transfer to the United States

    SciTech Connect (OSTI)

    Sharokhi, M.

    1985-01-01

    This dissertation, theoretically and empirically, focuses on US licensees as the recipient of foreign technology, and investigates characteristics of licensees, licenses, and licensed technology. The viability of reverse licensing, as an international growth strategy, is evaluated from the standpoint of two groups of firms. The first consists of thousands of small and medium sized US manufacturing firms, with few products and virtually no R and D expenditures. Without R and D, new technology and stiff international competition, they are forced into bankruptcies despite their extreme importance in the economy (48% of private workforce, 42% of sales, and 38% of GNP). The second group consists of thousands of small and medium sized firms overseas, with a relatively good supply of technology (i.e., patents) and anxious to exploit the US market but lack required resources for FDI. Technology licensing is, perhaps, the only viable option available to them. Reverse licensing provides both groups with a mechanism for their growth, survival, and prosperity. Many US firms have utilized this strategy for many years (i.e, 118 in Ohio) for tapping foreign sources including Soviet bloc technology.

  12. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Office of Environmental Management (EM)

    Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm ...

  13. Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors

    SciTech Connect (OSTI)

    1997-12-01

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC`s Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission in 1996.

  14. Office for Analysis and Evaluation of Operational Data. 1992 annual report: Nonreactors: Volume 7, No. 2

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC`s Operations Center. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued for 1981--1992.

  15. Office for Analysis and Evaluation of Operational Data 1990 annual report

    SciTech Connect (OSTI)

    1991-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1990. The report is published in two separate parts. This document NUREG-1272, Vol. 5, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol.5, No. 2, covers nonreactors and presents a review of the events and concerns during 1990 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. Each volume contains a list of the AEOD reports issued for 1980 through 1990. 9 figs., 8 tabs.

  16. Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

    SciTech Connect (OSTI)

    Kostova, M.; Howard, D.; Elder, P.

    2013-07-01

    The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

  17. ISSUES MANAGEMENT PROGRAM MANUAL

    SciTech Connect (OSTI)

    Gravois, Melanie

    2007-06-27

    The Lawrence Berkeley National Laboratory (LBNL) Issues Management Program encompasses the continuous monitoring of work programs, performance and safety to promptly identify issues to determine their risk and significance, their causes, and to identify and effectively implement corrective actions to ensure successful resolution and prevent the same or similar problems from occurring. This document describes the LBNL Issues Management Program and prescribes the process for issues identification, tracking, resolution, closure, validation, and effectiveness of corrective actions. Issues that are governed by this program include program and performance deficiencies or nonconformances that may be identified through employee discovery, internal or external oversight assessment findings, suggested process improvements and associated actions that require formal corrective action. Issues may also be identified in and/or may result in Root Cause Analysis (RCA) reports, Price Anderson Amendment Act (PAAA) reports, Occurrence Reporting and Processing System (ORPS) reports, Accident Investigation reports, assessment reports, and External Oversight reports. The scope of these issues may include issues of both high and low significance as well as adverse conditions that meet the reporting requirements of the University of California (UC) Assurance Plan for LBNL or other reporting entities (e.g., U.S. Environmental Protection Agency, U.S. Department of Energy). Issues that are found as a result of a walk-around or workspace inspection that can be immediately corrected or fixed are exempt from the requirements of this document.

  18. Front Burner- Issue 13

    Broader source: Energy.gov [DOE]

    The Cybersecurity Front Burner Issue No. 13 contained a message from the Associate Chief Information Officer (ACIO) for Cybersecurity as well as a listing of recommended cybersecurity practices.

  19. Tribal Utility Policy Issues

    Broader source: Energy.gov (indexed) [DOE]

    ... Coal Combustion Residuals Regulation Act of 2015 (H.R. 1734) FCC's Connect America Funding to provide broadband to rural communities Gas Utility Issues Pipeline Safety & ...

  20. Front Burner- Issue 16

    Broader source: Energy.gov [DOE]

    The Cybersecurity Front Burner Issue No. 16 addresses Malware, the Worst Passwords of 2013, and the Flat Stanley and Stop.Think.Connect. Campaign.

  1. Front Burner- Issue 18

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Cybersecurity Front Burner Issue No. 18 addresses keeping kids safe on the Internet, cyber crime, and DOE Cyber awareness and training initiatives.

  2. FRONT BURNER- ISSUE 19

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Cybersecurity Front Burner Issue No. 19 examines Securing the Internet of Things, Facebook Messenger Application, and implementation of the Contractor Training Site.

  3. Issues in recycling galvanized scrap

    SciTech Connect (OSTI)

    Koros, P.J.; Hellickson, D.A.; Dudek, F.J.

    1995-02-10

    The quality of the steel used for most galvanizing (and tinplate) applications makes scrap derived from their production and use a premier solid charge material for steelmaking. In 1989 the AISI created a Task Force to define the issues and to recommend technologically and economically sound approaches to assure continued, unhindered recyclability of the growing volume of galvanized scrap. The AISI program addressed the treatment of full-sized industrial bales of scrap. The current, on-going MRI (US)--Argonne National Laboratory program is focused on ``loose`` scrap from industrial and post-consumer sources. Results from these programs, issues of scrap management from source to steel melting, the choices for handling zinc in iron and steelmaking and the benefits/costs for removal of zinc (and lead) from scrap prior to melting in BOF and foundry operations are reviewed in this paper.

  4. DOE Issues Guidance on Electric Vehicle Recharging Stations

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy recently issued guidance to its national laboratory management and operating (M&O) contractors on the installation and operation of electric vehicle recharging...

  5. Licensed reactor nuclear safety criteria applicable to DOE reactors

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    This document is a compilation and source list of nuclear safety criteria that the Nuclear Regulatory Commission (NRC) applies to licensed reactors; it can be used by DOE and DOE contractors to identify NRC criteria to be evaluated for application to the DOE reactors under their cognizance. The criteria listed are those that are applied to the areas of nuclear safety addressed in the safety analysis report of a licensed reactor. They are derived from federal regulations, USNRC regulatory guides, Standard Review Plan (SRP) branch technical positions and appendices, and industry codes and standards.

  6. NETL Sorbents Licensed to Help Lower Power Draw of HVAC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sorbents Licensed To Help Lower Power Draw of HVAC Success Story NETL has licensed one of its patented CO 2 - removal sorbents to Boston-based technology company enVerid Systems. enVerid has adopted the sorbent for use in their proprietary Heat Load Reduction (HLR) module, a retrofit air-recirculation system it designed to increase the energy efficiency of commercial HVAC (heating, ventilation, and air conditioning) systems. HVAC is one of the largest draws of electric power in the United

  7. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3-70). Volume 2, Public comments and NRC response

    SciTech Connect (OSTI)

    Zeitoun, A.

    1994-08-01

    The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are co on, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility.

  8. Hydrogen Delivery Options and Issues

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Options and Issues Mark Paster DOE August, 2006 Scope * From the end point of central or distributed production (300 psi H2) to and including the dispenser at a refueling station or stationary power site - GH2 Pipelines and Trucks, LH2 Trucks, Carriers <$1.00/kg of Hydrogen by 2017 Hydrogen Delivery H2 Delivery Current Status * Technology - GH2 Tube Trailers: ~340 kg, ~2600 psi - LH2 Trucks: ~3900 kg - Pipelines: up to 1500 psi (~630 miles in the U.S.) - Refueling Site Operations

  9. Current regulatory and licensing status for byproduct sources, facilities and applications

    SciTech Connect (OSTI)

    Tingey, G.L.; Jensen, G.A.; Hazelton, R.F.

    1985-02-01

    Public use of nuclear byproducts, especially radioactive isotopes, will require approval by various regulatory agencies. Use of cesium-137 as an irradiation source for sterilizing medical products will require US Nuclear Regulatory Commission (NRC) approval. Two applications have been filed with NRC, and approval is expected soon. Widespread use of irradiation for food products depends on a favorable ruling by the Food and Drug Administration (FDA). A ruling is pending that would permit irradiation of fruits and vegetables up to 100 krad. NRC also controls the use of isotopes in remote power generators, but little regulatory action has been required in recent years. Recent development of radioluminescent (RL) lighting for runway lights has led to interest by commercial manufacturers. At the present time, a license has been issued to at least one manufacturer for sale of tritium-powered runway lights. 28 refs., 1 fig.

  10. CATEGORIZATION OF EVENT SEQUENCES FOR LICENSE APPLICATION

    SciTech Connect (OSTI)

    G.E. Ragan; P. Mecheret; D. Dexheimer

    2005-04-14

    The purposes of this analysis are: (1) Categorize (as Category 1, Category 2, or Beyond Category 2) internal event sequences that may occur before permanent closure of the repository at Yucca Mountain. (2) Categorize external event sequences that may occur before permanent closure of the repository at Yucca Mountain. This includes examining DBGM-1 seismic classifications and upgrading to DBGM-2, if appropriate, to ensure Beyond Category 2 categorization. (3) State the design and operational requirements that are invoked to make the categorization assignments valid. (4) Indicate the amount of material put at risk by Category 1 and Category 2 event sequences. (5) Estimate frequencies of Category 1 event sequences at the maximum capacity and receipt rate of the repository. (6) Distinguish occurrences associated with normal operations from event sequences. It is beyond the scope of the analysis to propose design requirements that may be required to control radiological exposure associated with normal operations. (7) Provide a convenient compilation of the results of the analysis in tabular form. The results of this analysis are used as inputs to the consequence analyses in an iterative design process that is depicted in Figure 1. Categorization of event sequences for permanent retrieval of waste from the repository is beyond the scope of this analysis. Cleanup activities that take place after an event sequence and other responses to abnormal events are also beyond the scope of the analysis.

  11. Fact #922: April 25, 2016 Share of Older Population Holding Driver’s Licenses is Up and Share of Younger Population Holding Driver’s Licenses is Down- Dataset

    Broader source: Energy.gov [DOE]

    Excel file and dataset for Share of Older Population Holding Driver’s Licenses is Up and Share of Younger Population Holding Driver’s Licenses is Down

  12. Open Discussion of Freeze Related Issues

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Cell Operations at Sub- Freezing Temperatures Open Discussion of Freeze Related Issues Moderator, Doug Wheeler 1. "Using Computational Fluid Dynamics to Understand Freezing in PEMFCs", John Van Zee, University of South Carolina 2. "Freeze Issues & Landscape of Fuel Cell Freeze Patents", Ahmad Pesaran, National Renewable Energy Laboratory 3. "A Study on Performance Degradation of PEMFC by Water Freezing", EunAe Cho, Fuel Cell Research Center, Korea Institute

  13. AAC R17-1-102 Licensing Time Frames | Open Energy Information

    Open Energy Info (EERE)

    1-102 Licensing Time Frames Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: AAC R17-1-102 Licensing Time FramesLegal...

  14. New York: EERE-Supported Catalyst Licensed for Use in Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supported Catalyst Licensed for Use in Fuel Cell Hybrid Advanced Vehicles New York: EERE-Supported Catalyst Licensed for Use in Fuel Cell Hybrid Advanced Vehicles January 24, 2014 ...

  15. Fact #761: January 7, 2013 Smaller Share of Teenagers Have a Driver's License in 2010

    Broader source: Energy.gov [DOE]

    In the 1980's, more than half of all teenagers 15 to 19 years old had a driver's license. But that has changed. Since 1995, less than half of that age group has a driver's license. In 2010, the...

  16. ISO and software quality assurance - licensing and certification of software professionals

    SciTech Connect (OSTI)

    Hare, J.; Rodin, L.

    1997-11-01

    This report contains viewgraphs on licensing and certifing of software professionals. Discussed in this report are: certification programs; licensing programs; why became certified; certification as a condition of empolyment; certification requirements; and examination structures.

  17. A review of the new ISC-PRIME model and implications for power plant licensing in Maryland

    SciTech Connect (OSTI)

    Gill, S.; Garrison, M.; Sherwell, J.

    1999-07-01

    The Maryland Department of Natural Resources (DNR) Power Plant Research Program (PPRP) manages the consolidated review of environmental, engineering, socioeconomic, cost, and need issues that new and modified power plants in Maryland must address as part of the power plant licensing process. Power plant licensing cases in Maryland have included the addition or replacement of small diesel or combustion turbine electrical generation units, or the addition of new, larger simple-cycle combustion turbine units. Air quality modeling, including an assessment of the effects of building downwash, is often a part of the licensing process. The Electric Power Research Institute (EPRI) has sponsored the development of an improved building downwash model through its PRIME (Plume Rise Model Enhancements) project, involving the design and development of algorithms intended to address deficiencies in the widely used ISCST3. EPA recently provided a version of ISC that incorporates the PRIME model (ISC-PRIME) for review and comment by the public prior to deciding on the suitability and regulatory status of ISC-PRIME. The present paper focuses on a systematic evaluation of ISC-PRIME as it relates to short stacks with exhaust characteristics similar to diesel generators and combustion turbines, using both routine hourly meteorology and synthesized meteorological data covering a wide variety of stability and wind speed combinations. The goals of the paper are two-fold: first, to understand and explain the implications of this new model for power plant licensing decisions in the State of Maryland; and second, to broaden the experience base of the potential ISC-PRIME user community with information on model performance details that are not otherwise readily available.

  18. The Texas concurrent characterization, licensing, and development process

    SciTech Connect (OSTI)

    Avant, R.V. Jr.

    1993-03-01

    The 72nd Texas Legislature specifically delineated a 400-square-mile area in southeast Hudspeth County where siting activities would be limited. The Authority was given unprecedented powers of property access and eminent domain and expanded budget authority to conduct site selection, characterization, and licensing. In the summer of 1991, the Authority identified five general siting areas in the prescribed region, and in the fall of 1991, the Authority narrowed the siting area to one large ranch composed of about 16,000 acres--called the Faskin Ranch. Site characterization began in 1991 and will be complete by September 1993. In September 1991, Authority staff began preparing the license application and included all available information on the Faskin Ranch. At its February meeting, the Authority`s board directed staff to submit the license application to the Texas Water Commission (the new Texas radiation control agency). The license application was submitted on March 2, 1992, and on April 15, 1992, the Commission determined that the application was sufficiently complete to begin review. Discrete technical packages such as groundwater hydrology, surface water hydrology, design, etc., will be submitted to the agency for review on the completion of each package. A schedule has been developed to allow the regulators the maximum time possible to review critical technical areas while minimizing the total review period.

  19. FTCP Issue Papers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issue Papers FTCP Issue Papers Document Number Subject Disposition FTCP-12-003 Supplemental Competencies Approved by FTCP Chair, December 19, 2012 FTCP-12-001 Use of "Expert Level" in Qualification Path Forward Approved by vote at May 15, 2012 meeting; to delete all reference to expert-level knowledge requirements in FAQS FTCP-10-003 Expert Competencies Pertaining to DOE Orders & Technical Standards Issue transitioned to FY 2011 FTCP Operational Plan Goal #2 FTCP-10-002

  20. Natural gas 1998: Issues and trends

    SciTech Connect (OSTI)

    1999-06-01

    Natural Gas 1998: Issues and Trends provides a summary of the latest data and information relating to the US natural gas industry, including prices, production, transmission, consumption, and the financial and environmental aspects of the industry. The report consists of seven chapters and five appendices. Chapter 1 presents a summary of various data trends and key issues in today`s natural gas industry and examines some of the emerging trends. Chapters 2 through 7 focus on specific areas or segments of the industry, highlighting some of the issues associated with the impact of natural gas operations on the environment. 57 figs., 18 tabs.

  1. DOE Issues Noncompliance Notices

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Office of Enforcement issued a Notice of Noncompliance Determination to Haier America Trading, L.L.C., regarding Haier compact chest freezer model number HNCM070,...

  2. DOE Issues Noncompliance Notices

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Office of Enforcement issued Notices of Noncompliance Determinations to Midea America Corporation and Felix Storch, Inc. for a compact freezer that, as determined by...

  3. Community Issues - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In recent months, significant SRS-related community issues have included the Department of Energy's decision to abandon its long-standing commitment to Yucca Mountain in Nevada as ...

  4. Operating Experience Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    June 19, 2014 Operating Experience Summary - 2014-03 - June 19, 2014 Inside this issue: Wilson Construction Company Crew Foreman Receives Fatal Shock during Transmission Line ...

  5. Operating Experience Summary, 2015-01

    Energy Savers [EERE]

    1 September 16, 2015 Inside This Issue * Explosion at the Nonproliferation Test and Evaluation Complex ... 1 Page 1 of 8 Operating Experience Summary Office of Environment,...

  6. Preliminary Notice of Violation, URS Global Management & Operations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    URS Global Management & Operations Services - NEA-2011-04 Preliminary Notice of Violation, URS Global Management & Operations Services - NEA-2011-04 September 1, 2011 Issued to ...

  7. Office for Analysis and Evaluation of Operational Data 1994-FY 95 annual report. Volume 9, Number 2

    SciTech Connect (OSTI)

    1996-09-01

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during CY 1994 and FY 1995. The report is published in three parts. NUREG-1272, Vol. 9, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC`s Operations Center. NUREG-1272, Vol. 9, No. 2, covers nuclear materials and presents a review of the events and concerns associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from 1980 through FY 1995. NUREG-1272, Vol. 9, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission.

  8. Office for Analysis and Evaluation of Operational Data 1992 annual report: Power reactors. Volume 7, No. 1

    SciTech Connect (OSTI)

    1993-07-01

    The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance, measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from such sources as licensee event report% diagnostic evaluations, and reports to the NRC`s Operations Center. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Each volume contains a list of the AEOD reports issued for 1984--1992.

  9. DOE Issues Request for Information for Richland Operations Office...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contract(s) Acquisition Planning October 15, 2015 - 2:00pm ... specialized capabilities necessary to successfully perform ... the environmental cleanup projects and Hanford Site ...

  10. Energy Department Issues Draft Request for Proposals for Operation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... The draft RFP will be available on DOE's Industry Interactive Procurement System andor FedBizOpps. Media contact(s): Jeff Sherwood, (202) 586-4940 Walter Perry, (865) 576-0885 ...

  11. DOE?s Idaho Operations Office Issues 2011-Beyond Strategic...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    support DOE's missions in energy, science and national security, through excellence in management. The DOE-ID Strategic Plan sets out objectives for ID and its contractors that...

  12. Issued by Sandia National Laboratories, operated for the United...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of average annual power using 2 and 42 bending moment (BM) deendencies. Figure 3.2. PROP output for the AWT-26 model. 33 Figure 3.3. Power to Average Power Conversion. 33...

  13. Natural Gas Transportation - Infrastructure Issues and Operational Trends

    Reports and Publications (EIA)

    2001-01-01

    This report examines how well the current national natural gas pipeline network has been able to handle today's market demand for natural gas. In addition, it identifies those areas of the country where pipeline utilization is continuing to grow rapidly and where new pipeline capacity is needed or is planned over the next several years.

  14. FRONT BURNER- Issue 20

    Broader source: Energy.gov [DOE]

    The Cybersecurity Front Burner Issue No. 20 examines Phishing to include defining Phishing and related terms and how to protect yourself from this very common and clever security threat. The newsletter also addresses wireless networks, supply chains, training events, and readily available cybersecurity resources. Stay cyber informed and check it out!

  15. JPRS report proliferation issues

    SciTech Connect (OSTI)

    1991-11-18

    This report contains foreign media information on issues related to worldwide proliferation and transfer activities in nuclear, chemical, and biological weapons, including delivery systems and the transfer of weapons relevant technologies. The following locations are included: (1) China; (2) Indonesia; (3) Bulgaria; (4) Brazil, Cuba; (5) Egypt, India, Iran, Iraq, Israel, Pakistan; (6) Soviet Union; and (7) France, Germany, United Kingdom, Italy, Norway.

  16. Environmental Compliance Issue Coordination

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1993-01-07

    To establish the Department of Energy (DOE) requirements for coordination of significant environmental compliance issues to ensure timely development and consistent application of Departmental environmental policy and guidance. Cancels DOE O 5400.2. Para. 5a(2) and 5a(7) canceled by DOE O 231.1.

  17. NATIONAL ENERGY TECHNOLOGY LABORATORY Technology Transfer NETL Licenses Transformational

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Licenses Transformational Technology for Carbon Dioxide Capture Success Story Carbon capture and storage from fossil fuel-based power generation systems are critical strategic components to curb emissions of atmospheric carbon dioxide (CO 2 ). Currently available carbon capture processes are limited-significantly reducing the efficiency of power generation and increasing electricity cost. Working in collaboration with partners at Carnegie Mellon University, NETL researchers have developed a

  18. Technology available for license: Charging of liquid energy storage media

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    through radiolysis (ANL-IN-14-036) | Argonne National Laboratory Technology available for license: Charging of liquid energy storage media through radiolysis (ANL-IN-14-036) January 23, 2015 Tweet EmailPrint This technology utilizes radiolysis to charge liquid energy storage media including nanoelectrofuels. Charged liquid can be used in flow batteries for transportation and stationary energy-storage applications. Radiolysis charging can be conducted on aqueous and non-aqueous battery

  19. Investing in the Energy Future: An Industry Guide to Licensing Technologies at the National Renewable Energy Laboratory (NREL) (Brochure)

    SciTech Connect (OSTI)

    Not Available

    2010-09-01

    Provides an overview of NREL's licensing opportunities and processes, and commercialization programs.

  20. Issue Development sheet Blank

    Broader source: Energy.gov [DOE]

    ISSUE DEVELOPMENT SHEET INFORMATION ONLY The information provided below indicates that a potential concern for finding has been identified. Please provide any objective evidence you may have that could either alleviate the concern or eliminate the finding. If no objective evidence is available/can be provided by the end of this audit (at the scheduled end of field work), this information will be included in the audit report and reported as a concern or an audit finding as appropriate.

  1. Issues Management Tool

    Energy Science and Technology Software Center (OSTI)

    2010-12-31

    IMTool performs the following: • The IMTool can manage issues, actions, and activities from one screen. • Provides enhanced and intuitive searching, sorting, and filtering capabilities. Grids allow for filtering any column instantly by any data heading. • IMTool uses drop-down menus to ensure date is entered accurately with consistency. • User-friendly system – highly utilized commitment tracking screen functions. Information is viewed on the left side of the screen and managed on the right.

  2. JPRS report proliferation issues

    SciTech Connect (OSTI)

    1991-12-02

    This report contains foreign media information on issues related to worldwide proliferation and transfer activities in nuclear, chemical, and biological weapons, including delivery systems and the transfer of weapons relevant technologies. The following locations are included: (1) South Africa; (2) China; (3) North and South Korea, Taiwan; (4) Hungary, Yugoslavia; (5) Brazil, Argentina; (6) Afghanistan, India, Iran, Iraq, Israel, Pakistan; (7) Soviet Union; and (8) France, Germany, Italy, Switzerland.

  3. JPRS report proliferation issues

    SciTech Connect (OSTI)

    1991-12-13

    This report contains foreign media information on issues related to worldwide proliferation and transfer activities in nuclear, chemical, and biological weapons, including delivery systems and the transfer of weapons relevant technologies. The following locations are included: (1) South Africa; (2) China; (3) North and South Korea, Taiwan; (4) Hungary; (5) Brazil; (6) India, Iran, Israel, Pakistan; (7) Soviet Union; and (8) Austria, Germany, United Kingdom.

  4. Issue Development sheet Example

    Broader source: Energy.gov [DOE]

    ISSUE DEVELOPMENT SHEET INFORMATION ONLY The information provided below indicates that a potential concern for finding has been identified. Please provide any objective evidence you may have that could either alleviate the concern or eliminate the finding. If no objective evidence is available/can be provided by the end of this audit (at the scheduled end of field work), this information will be included in the audit report and reported as a concern or an audit finding as appropriate.

  5. Preparing to Submit a License Application for Yucca Mountain

    SciTech Connect (OSTI)

    W.J. Arthur; M.D. Voegele

    2005-03-14

    In 1982, the U.S. Congress passed the Nuclear Waste Policy Act, a Federal law that established U.S. policy for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Congress amended the Act in 1987, directing the Department of Energy to study only Yucca Mountain, Nevada as the site for a permanent geologic repository. As the law mandated, the Department evaluated Yucca Mountain to determine its suitability as the site for a permanent geologic repository. Decades of scientific studies demonstrated that Yucca Mountain would protect workers, the public, and the environment during the time that a repository would be operating and for tens of thousands of years after closure of the repository. A repository at this remote site would also: preserve the quality of the environment; allow the environmental cleanup of Cold War weapons facilities; provide the nation with additional protection from acts of terrorism; and support a sound energy policy. Throughout the scientific evaluation of Yucca Mountain, there has been no evidence to disqualify Yucca Mountain as a suitable site for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Upon completion of site characterization, the Secretary of Energy considered the results and concluded that a repository at Yucca Mountain would perform in a manner that protects public health and safety. The Secretary recommended the site to the President in February 2002; the President agreed and recommended to Congress that the site be approved. The Governor of Nevada submitted a notice of disapproval, and both houses of Congress acted to override the disapproval. In July 2002, the President's approval allowed the Department to begin the process of submittal of a license application for Yucca Mountain as the site for the nation's first repository for spent nuclear fuel and high-level radioactive waste. Yucca Mountain is located on federal land in Nye County in southern Nevada, an arid region

  6. Operational Excellence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operational Excellence Operational Excellence The Lab's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. aeiral shot of los alamos, new mexico What Los Alamos gets done as a premier national security science laboratory depends on how we do it The Laboratory's operations and business systems ensure the safe, secure, and

  7. Operations Videos

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Research Analysts The U.S. Energy Information Administration (EIA) within the Department of Energy has forged a world-class information program that stresses quality, teamwork, and employee growth. In support of our program, we offer a variety of profes- sional positions, including the Operations Research Analyst, whose work is associated with the development and main- tenance of energy modeling systems. Responsibilities: Operations Research Analysts perform or participate in one or

  8. Laboratory Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Operations Laboratory Operations Latest announcements from the Lab on its operations. News Releases Science Briefs Photos Picture of the Week Publications Social Media Videos Fact Sheets The Laboratory began the Hazmat Challenge in 1996 to hone the skills of its own hazmat team members. 20th Hazmat Challenge tests skills of hazardous materials response teams Ten hazardous materials response teams from New Mexico, Missouri, Oklahoma and Nebraska test their skills in a series of graded,

  9. Laboratory Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Hockaday is the associate director of the Experimental Physical Sciences Directorate and Cabbil is associate director for Nuclear and High Hazard Operations. - 12513 Norris ...

  10. operations center

    National Nuclear Security Administration (NNSA)

    servers and other critical Operations Center equipment

  11. Independent air supply system filtered to protect against biological and radiological agents (99.7%).
  12. <...

  13. SPEAR Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Interface 1113 N. Kurita J. Langton Vacuum TSP's 1120 J. Corbett A. Terebilo MATLAB Applications - Basics 1121 F. Rafael Booster Kicker Upgrade, Operation Manual 1121...

  14. Also In This Issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    In This Issue ■ Annual review assesses the state of science and technology in NMT Division ■ Technology transfer between Savannah River and the national labs ■ Plutonium Futures conference speakers set ■ Mary Neu is intrigued by actinides ■ "Eye of the Beholder" N u c l e a r M a t e r i a l s R e s e a r c h a n d T e c h n o l o g y Quarterly Actinide Research Researchers cast first "spiked" plutonium alloy 2nd quarter 2002 Nuclear Materials Technology Division

  15. Tribal Utility Policy Issues

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Utility Policy Issues New Mexico July 27, 2015 Margaret Schaff Kanim Associates, LLC (An Indian Owned Consulting Firm) 303-443-0182 mschaff@att.net *US Energy Information Administration New Mexico Energy Stats  Sixth in crude oil production in the nation in 2013.  5% of U.S. marketed natural gas production in 2012  Largest coal-fired electric power plants in NM both on Navajo Nation  2,100-megawatt Four Corners (Navajo Mine) (APS)  1,643-megawatt San Juan (San Juan Mines) (Public

  16. Evaluating the Probabilistic Land-Use Scenarios in the Radiological Dose Assessment for License Termination

    SciTech Connect (OSTI)

    Chen, S.Y.; Yu, C.; Kamboj, S.; Allison, T.; LePoire, D.; Mo, T.

    2006-07-01

    A recent trend in establishing regulatory policy regarding environmental cleanup has been the adoption of a risk-informed decision approach. This approach places an emphasis on the development of a defensible technical basis upon which cleanup decisions can be understood and accepted by stakeholders. The process has been exemplified by the U.S. Nuclear Regulatory Commission's (NRC's) approach to implement its License Termination Rule in Title 10, Part 20, Subpart E of the Code of Federal Regulations (10 CFR 20, Subpart E), for which probabilistic radiological dose assessment has been a key technical element for demonstrating compliance. Further guidance including NUREG-1757 and its supplemental document are also prepared for this purpose. The approach also entails extensive data collection to cover the range of parameter variability, along with interpretations of the probabilistic dose results and demonstration of compliance. One major remaining issue, however, involves the future use of the land following cleanup. Land use is a key factor that may profoundly influence dose assessment, which in turn will affect the level of cleanup and therefore the associated costs. Despite this, incorporation of land-use considerations into the current probabilistic dose assessment approach has not actually been performed in the regulatory process. In order to address the issue, a study was initiated to evaluate the potential influence of land use on dose analysis, to understand the possible ramifications in cleanup decision-making. A probabilistic distribution based on land use was developed as input into the probabilistic RESRAD analysis for the demonstration of this approach.. This results in an understanding of the characteristics of dose distributions as exhibited by various land-use scenarios. By factoring in the probability distribution of land-use scenarios, the potential 'levels of conservatism' can be explicitly defined and evaluated. The results allow the

  17. Sensor system scaling issues

    SciTech Connect (OSTI)

    Canavan, G.H.

    1996-07-01

    A model for IR sensor performance is used to compare estimates of sensor cost effectiveness. Although data from aircraft sensors indicate a weaker scaling, their agreement is adequate to support the assessment of the benefits of operating up to the maximum altitude of most current UAVs.

  18. Environmental issues in China

    SciTech Connect (OSTI)

    Travis, P.S.

    1991-10-01

    Global concern about the environment is increasing, and the People's Republic of China (PRC) is not immune from such concerns. The Chinese face issues similar to those of many other developing nations. The US Department of Energy is particularly interested in national and world pollution issues, especially those that may infringe on other countries' economic growth and development. The DOE is also interested in any opportunities that might exist for US technical assistance and equipment in combating environmental problems. Our studies of articles in the China Daily, and English-language daily newspaper published by the Chinese government, show that population, pollution, and energy are major concerns of the Chinese Communist Party. Thus this report emphasizes the official Chinese government view. Supporting data were also obtained from other sources. Regardless of the severity of their various environmental problems, the Chinese will only try to remedy those problems with the greatest negative effects on its developing economy. They will be looking for foreign assistance, financial and informational, to help implement solutions. With the Chinese government seeking assistance, the United States has an opportunity to export basic technical information, especially in the areas of pollution control and monitoring, oil exploration methods, oil drilling technology, water and sewage treatment procedures, hazardous waste and nuclear waste handling techniques, and nuclear power plant safety procedures. In those areas the US has expertise and extensive technical experience, and by exporting the technologies the US would benefit both economically and politically. 59 refs., 3 figs.

  19. Reformulated gasoline quality issues

    SciTech Connect (OSTI)

    Gonzalez, R.G.; Felch, D.E.; Edgar, M.D.

    1995-11-01

    One year ago, a panel of industry experts were interviewed in the November/December 1994 issue of Fuel Reformulation (Vol. 4, No. 6). With the focus then and now on refinery investments, the panelists were asked to forecast which refining processes would grow in importance. It is apparent from their response, and from other articles and discussions throughout the year, that hydroprocessing and catalytic conversion processes are synergistic in the overall refinery design, with flexibility and process objectives varying on a unit-by-unit case. To an extent, future refinery investments in downstream petrochemicals, such as for paraxylene production, are based on available catalytic reforming feedstock. Just a importantly, hydroprocessing units (hydrotreating, hydrocracking) needed for clean fuel production (gasoline, diesel, aviation fuel), are heavily dependent on hydrogen production from the catalytic reformer. Catalytic reforming`s significant influence in the refinery hydrogen balance, as well as its status as a significant naphtha conversion route to higher-quality fuels, make this unit a high-priority issue for engineers and planners striving for flexibility.

  20. Procurement of a fully licensed radioisotope thermoelectric generator transportation system

    SciTech Connect (OSTI)

    Adkins, H.E.; Bearden, T.E.

    1990-10-01

    A fully licensed transportation system for Radioisotope Thermoelectric Generators and Light-Weight Radioisotope Heater Units is currently being designed and built. The system will comply with all applicable US Department of Transportation regulations without the use of a DOE Alternative.'' The US Department of Transportation has special double containment'' requirements for plutonium. The system packaging uses a doubly contained bell jar'' concept. A refrigerated trailer is used for cooling the high-heat payloads. The same packaging is used for both high- and low-heat payloads. The system is scheduled to be available for use by mid-1992. 4 refs., 4 figs., 2 tabs.

  21. EERE Success Story-New York: EERE-Supported Catalyst Licensed...

    Energy Savers [EERE]

    Supported Catalyst Licensed for Use in Fuel Cell Hybrid Advanced Vehicles EERE Success ... Facility Opened Using EERE-Supported Low-Cost Fuel Cell Manufacturing Methods Project ...

  22. Downloaded 01 Jul 2002 to 128.104.222.103. Redistribution subject to AIP license

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Jul 2002 to 128.104.222.103. Redistribution subject to AIP license or copyright, see http://ojps.aip.org/pop/popcr.jsp Downloaded 01 Jul 2002 to 128.104.222.103. Redistribution subject to AIP license or copyright, see http://ojps.aip.org/pop/popcr.jsp Downloaded 01 Jul 2002 to 128.104.222.103. Redistribution subject to AIP license or copyright, see http://ojps.aip.org/pop/popcr.jsp Downloaded 01 Jul 2002 to 128.104.222.103. Redistribution subject to AIP license or copyright, see

  1. Downloaded 10 Jan 2005 to 128.104.223.90. Redistribution subject to AIP license

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 Jan 2005 to 128.104.223.90. Redistribution subject to AIP license or copyright, see http://pof.aip.org/pof/copyright.jsp Downloaded 10 Jan 2005 to 128.104.223.90. Redistribution subject to AIP license or copyright, see http://pof.aip.org/pof/copyright.jsp Downloaded 10 Jan 2005 to 128.104.223.90. Redistribution subject to AIP license or copyright, see http://pof.aip.org/pof/copyright.jsp Downloaded 10 Jan 2005 to 128.104.223.90. Redistribution subject to AIP license or copyright, see

  2. NREL: Wind Research - NREL and Partners Review Key Issues, Lessons...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NREL and Partners Review Key Issues, Lessons Learned from U.S. Wind Integration Studies and Operating Practices April 17, 2015 As a complement to DOE's recently released Wind...

  3. Steam Pressure Reduction: Opportunities and Issues | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pressure Reduction: Opportunities and Issues Steam Pressure Reduction: Opportunities and Issues This brief details industrial steam generation systems best practices and opportunities for reducing steam system operating pressure. Steam Pressure Reduction: Opportunities and Issues (November 2005) (1.18 MB) More Documents & Publications Steam System Survey Guide Improving Steam System Performance: A Sourcebook for Industry, Second Edition Install an Automatic Blowdown-Control System

  4. Advocate - Issue 57 - January 2015 | Department of Energy

    Office of Environmental Management (EM)

    7 - January 2015 Advocate - Issue 57 - January 2015 Here are the topics in this issue: ORSSAB Has Open Discussion About Board Operations EM & Stewardship Committee Members Take Field Trip to ETTP DOE Continues to Work With TRU Waste During WIPP Shutdown Public Has Several Ways to Learn About 25 Years of EM Sucesses Eight Boards Comprise the National EM Site Specific Advisory Board January 2015 Advocate Newsletter (1.19 MB) More Documents & Publications Advocate - Issue 58 - April 2015

  5. Issues for reuse of gloveboxes at LANL TA-55

    SciTech Connect (OSTI)

    Cadwallader, L.C.; Pinson, P.A.; Miller, C.F.

    1998-08-01

    This report is a summary of issues that face plutonium glovebox designers and users at the Los Alamos National Laboratory (LANL) Technical Area 55 (TA-55). Characterizing the issues is a step in the task of enhancing the next generation glovebox design to minimize waste streams while providing the other design functions. This report gives an initial assessment of eight important design and operation issues that can benefit from waste minimization.

  6. Threatened and Endangered Species Evaluation for Operating Commercial Nuclear Power Generating Plants

    SciTech Connect (OSTI)

    Sackschewsky, Michael R.

    2004-01-15

    The Endangered Species Act (ESA) of 1973 requires that federal agencies ensure that any action authorized, funded, or carried out under their jurisdiction is not likely to jeopardize the continued existence of any threatened or endangered (T&E) species or result in the destruction or adverse modification of critical habitats for such species. The issuance and maintenance of a federal license, such as a construction permit or operating license issued by the U.S. Nuclear Regulatory Commission (NRC) for a commercial nuclear power generating facility is a federal action under the jurisdiction of a federal agency, and is therefore subject to the provisions of the ESA. The Office of Nuclear Reactor Regulation (NRR) staff have performed appropriate assessments of potential impacts to threatened or endangered species, and consulted with appropriate agencies with regard to protection of such species in authorizing the construction, operation, and relicensing of nuclear power generating facilities. However, the assessments and consultations concerning many facilities were performed during the 1970's or early 1980's, and have not been re-evaluated in detail or updated since those initial evaluations. A review of potential Endangered Species Act issues at licensed nuclear power facilities was completed in 1997. In that review 484 different ESA-listed species were identified as potentially occurring near one or more of the 75 facility sites that were examined. An update of the previous T&E species evaluation at this time is desired because, during the intervening 6 years: nearly 200 species have been added to the ESA list, critical habitats have been designated for many of the listed species, and significantly more information is available online, allowing for more efficient high-level evaluations of potential species presence near sites and the potential operation impacts. The updated evaluation included searching the NRC's ADAMS database to find any documents related to T

  7. EFRT M-12 Issue Resolution: Solids Washing

    SciTech Connect (OSTI)

    Baldwin, David L.; Schonewill, Philip P.; Toth, James J.; Huckaby, James L.; Eslinger, Paul W.; Hanson, Brady D.; Kurath, Dean E.; Minette, Michael J.

    2010-01-01

    Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, Undemonstrated Leaching Processes of the External Flowsheet Review Team (EFRT) issue response plan.( ) The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing.

  8. Small Business Issues for Environmental Restoration Acquisitions...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Issues for Environmental Restoration Acquisitions Small Business Issues for Environmental Restoration Acquisitions Small Business Issues for Environmental Restoration Acquisitions ...

  9. Table 9.1 Nuclear Generating Units, 1955-2011

    U.S. Energy Information Administration (EIA) Indexed Site

    1 Nuclear Generating Units, 1955-2011 Year Original Licensing Regulations (10 CFR Part 50) 1 Current Licensing Regulations (10 CFR Part 52) 1 Permanent Shutdowns Operable Units 7 Construction Permits Issued 2,3 Low-Power Operating Licenses Issued 3,4 Full-Power Operating Licenses Issued 3,5 Early Site Permits Issued 3 Combined License Applications Received 6 Combined Licenses Issued 3 1955 1 0 0 – – – – – – 0 0 1956 3 0 0 – – – – – – 0 0 1957 1 1 1 – – – – – – 0 1 1958 0 0 0 –

  10. Word Pro - Untitled1

    U.S. Energy Information Administration (EIA) Indexed Site

    71 Table 9.1 Nuclear Generating Units, 1955-2011 Year Original Licensing Regulations (10 CFR Part 50) 1 Current Licensing Regulations (10 CFR Part 52) 1 Permanent Shutdowns Operable Units 7 Construction Permits Issued 2,3 Low-Power Operating Licenses Issued 3,4 Full-Power Operating Licenses Issued 3,5 Early Site Permits Issued 3 Combined License Applications Received 6 Combined Licenses Issued 3 1955 1 0 0 - - - - - - 0 0 1956 3 0 0 - - - - - - 0 0 1957 1 1 1 - - - - - - 0 1 1958 0 0 0 - - - - -

  11. Sodium fast reactor safety and licensing research plan. Volume I.

    SciTech Connect (OSTI)

    Sofu, Tanju; LaChance, Jeffrey L.; Bari, R.; Wigeland, Roald; Denman, Matthew R.; Flanagan, George F.

    2012-05-01

    This report proposes potential research priorities for the Department of Energy (DOE) with the intent of improving the licensability of the Sodium Fast Reactor (SFR). In support of this project, five panels were tasked with identifying potential safety-related gaps in available information, data, and models needed to support the licensing of a SFR. The areas examined were sodium technology, accident sequences and initiators, source term characterization, codes and methods, and fuels and materials. It is the intent of this report to utilize a structured and transparent process that incorporates feedback from all interested stakeholders to suggest future funding priorities for the SFR research and development. While numerous gaps were identified, two cross-cutting gaps related to knowledge preservation were agreed upon by all panels and should be addressed in the near future. The first gap is a need to re-evaluate the current procedures for removing the Applied Technology designation from old documents. The second cross-cutting gap is the need for a robust Knowledge Management and Preservation system in all SFR research areas. Closure of these and the other identified gaps will require both a reprioritization of funding within DOE as well as a re-evaluation of existing bureaucratic procedures within the DOE associated with Applied Technology and Knowledge Management.

  12. Operating Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  13. Cold Test Operation of the German VEK Vitrification Plant

    SciTech Connect (OSTI)

    Fleisch, J.; Schwaab, E.; Weishaupt, M. [WAK GmbH, Eggenstein-Leopoldshafen (Germany); Gruenewald, W.; Roth, G.; Tobie, W. [Forschungszentrum Karlsruhe, Institut fur Nukleare Entsorgung, Eggenstein-Leopoldshafen (Germany)

    2008-07-01

    In 2007 the German High-Level Liquid Waste (HLLW) Vitrification plant VEK (Verglasungseinrichtung Karlsruhe) has passed a three months integral cold test operation as final step before entering the hot phase. The overall performance of the vitrification process equipment with a liquid-fed ceramic glass melter as main component proved to be completely in line with the requirements of the regulatory body. The retention efficiency of main radioactive-bearing elements across melter and wet off-gas treatment system exceeded the design values distinctly. The strategy to produce a specified waste glass could be successfully demonstrated. The results of the cold test operation allow entering the next step of hot commissioning, i.e. processing of approximately 2 m{sup 3} of diluted HLLW. In summary: An important step of the VEK vitrification plant towards hot operation has been the performance of the cold test operation from April to July 2007. This first integral operation was carried out under boundary conditions and rules established for radioactive operation. Operation and process control were carried out following the procedure as documented in the licensed operational manuals. The function of the process technology and the safe operation could be demonstrated. No severe problems were encountered. Based on the positive results of the cold test, application of the license for hot operation has been initiated and is expected in the near future. (authors)

  14. Advocate- Issue 47- July 2012

    Broader source: Energy.gov [DOE]

    Here are some of the topics from this issue: Wild West Tour, EM SSAB Chairs’ Meeting, and Reservation Updates.

  15. Guidance for tracking inquiries related to the licensing of inventions developed at DOE facilities

    Broader source: Energy.gov [DOE]

    The attached memorandum provides guidance for tracking inquiries received from outside parties regarding licensable inventions developed at Department of Energy facilities. To help ensure that the Facilities consistently track valid licensing inquiries, the guidance outlines a minimum set of information that must be collected from each inquiry and requires that this information be made available to the Technology Transfer Coordinator upon request.

  16. Summary report on safety and licensing strategy support for the ABR prototype.

    SciTech Connect (OSTI)

    Cahalan, J. E.; Nuclear Engineering Division

    2007-09-18

    Argonne National Laboratory is providing support to the US Department of Energy in the Global Nuclear Energy Partnership (GNEP) in certification of an advanced, sodium-cooled fast reactor. The reactor is to be constructed as a prototype for future commercial power reactors that will produce electricity while consuming actinides recovered from light water reactor spent fuel. This prototype reactor has been called the Advanced Burner Reactor, or ABR, and is now often referred to as the advanced recycle reactor. As part of its activities, Argonne is providing technical services to assist definition of a safety and licensing strategy for the ABR prototype, and to further implementation of the strategy. In FY06, an organizational meeting was held for DOE and its laboratory contractors to discuss licensing alternatives and review previous licensing experience for the Fast Flux Test Facility (FFTF) and the Clinch River Breeder Reactor Plant (CRBRP). Near the end of FY06, a report summarizing the discussions and conclusions was written. One of the top-level conclusions recorded in the report was a recommendation to follow a licensing strategy that included the US Nuclear Regulatory Commission (NRC) as the regulatory review and licensing authority. In FY07, activities ar Argonne to support safety and licensing progress have continued. These activities have focused on further evaluation of licensing alternatives; assessment of design, analysis, and documentation implications of licensing paths; and initial technical interactions with the Nuclear Regulatory Commission. This report summarizes FY07 activities.

  17. Radioactive waste storage issues

    SciTech Connect (OSTI)

    Kunz, D.E.

    1994-08-15

    In the United States we generate greater than 500 million tons of toxic waste per year which pose a threat to human health and the environment. Some of the most toxic of these wastes are those that are radioactively contaminated. This thesis explores the need for permanent disposal facilities to isolate radioactive waste materials that are being stored temporarily, and therefore potentially unsafely, at generating facilities. Because of current controversies involving the interstate transfer of toxic waste, more states are restricting the flow of wastes into - their borders with the resultant outcome of requiring the management (storage and disposal) of wastes generated solely within a state`s boundary to remain there. The purpose of this project is to study nuclear waste storage issues and public perceptions of this important matter. Temporary storage at generating facilities is a cause for safety concerns and underscores, the need for the opening of permanent disposal sites. Political controversies and public concern are forcing states to look within their own borders to find solutions to this difficult problem. Permanent disposal or retrievable storage for radioactive waste may become a necessity in the near future in Colorado. Suitable areas that could support - a nuclear storage/disposal site need to be explored to make certain the health, safety and environment of our citizens now, and that of future generations, will be protected.

  18. Assessment of the US regulations for fissile exemptions and fissile material general licenses

    SciTech Connect (OSTI)

    Parks, C.V.; Hopper, C.M.; Lichtenwalter, J.J. [Oak Ridge National Lab., TN (United States); Easton, E.P.; Brochman, P.G. [NRC, Washington, DC (United States)

    1997-05-01

    The paragraphs for general licenses for fissile material and exemptions (often termed exceptions in the international community) for fissile material have long been a part of the US Code of Federal Regulations (CFR) 10 CFR Part 71, Packaging and Transportation of Radioactive Material. More recently, the Nuclear Regulatory Commission (NRC) issued a final rule on Part 71 via emergency rule-making procedures in order to address an identified deficiency related to one of the fissile exemptions. To address the specified deficiency in a general fashion, the emergency rule adopted the approach of the 1996 Edition of the IAEA: Regulations for the Safe Transport of Radioactive Material (IAEA 1996), which places restrictions on certain moderating materials and limits the quantity of fissile material in a consignment. The public comments received by the NRC indicated general agreement with the need for restrictions on certain moderators (beryllium, deuterium, and graphite). The comments indicated concern relative to both the degree of restriction imposed (not more than 0.1% of fissile material mass) and the need to limit the fissile material mass of the consignment, particularly in light of the subsequent NRC staff position that the true intent was to provide control for limiting the fissile mass of the conveyance. The purpose of the review is to identify potential deficiencies that might be adverse to maintaining adequate subcriticality under normal conditions of transport and hypothetical accident conditions. In addition, ORNL has been asked to identify changes that would address any identified safety issues, enable inherently safe packages to continue to be unencumbered in transport, and seek to minimize the impact on current safe practices.

  19. Rich land Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TG Department of Energy Rich land Operations Office P.O. Box 550 AES Richland, Washington 99352 CERTIFIED MAIL NOV~ 2 10 2009 Mr. Gerald Pollet Heart of America Northwest 1314 N.E. 5 6 th Street Suite 100 Seattle, Washington 98105 Dear Mr. Pollet: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0054) The purpose of this letter is to inform you that we have withdrawn our response dated September 14, 2009, and have issued the following determination regarding item 8 of your request. In response to

  20. Personnel supply and demand issues in the nuclear power industry. Final report

    SciTech Connect (OSTI)

    Not Available

    1981-12-01

    Information is presented concerning engineering, personnel, reactor operators, health physics personnel, competing demands on technical manpower, personnel management issues, and emerging technology.

  1. CTBT technical issues handbook

    SciTech Connect (OSTI)

    Zucca, J.J.

    1994-05-01

    The purpose of this handbook is to give the nonspecialist in nuclear explosion physics and nuclear test monitoring an introduction to the topic as it pertains to a Comprehensive Test Ban Treaty (CTBT). The authors have tried to make the handbook visually oriented, with figures paired to short discussions. As such, the handbook may be read straight through or in sections. The handbook covers four main areas and ends with a glossary, which includes both scientific terms and acronyms likely to be encountered during CTBT negotiations. The following topics are covered: (1) Physics of nuclear explosion experiments. This is a description of basic nuclear physics and elementary nuclear weapon design. Also discussed are testing practices. (2) Other nuclear experiments. This section discusses experiments that produce small amounts of nuclear energy but differ from explosion experiments discussed in the first chapter. This includes the type of activities, such as laser fusion, that would continue after a CTBT is in force. (3) Monitoring tests in various environments. This section describes the different physical environments in which a test could be conducted (underground, in the atmosphere, in space, underwater, and in the laboratory); the sources of non-nuclear events (such as earthquakes and mining operations); and the opportunities for evasion. (4) On-site inspections. A CTBT is likely to include these inspections as an element of the verification provisions, in order to resolve the nature of ambiguous events. This chapter describes some technical considerations and technologies that are likely to be useful. (5) Selecting verification measures. This chapter discusses the uncertain nature of the evidence from monitoring systems and how compliance judgments could be made, taking the uncertainties into account. It also discusses how to allocate monitoring resources, given the likelihood of testing by various countries in various environments.

  2. Operating Strategies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operating Strategies and Design Recommendations for Mitigating Local Damage Effects in Offshore Turbine Blades Phillip W. Richards phillip@gatech.edu Graduate Research Assistant Daniel Guggenheim School of Aerospace Engineering Atlanta, Georgia, USA D. Todd Griffith dgriffi@sandia.gov Principal Member of the Technical Staff Sandia National Laboratories Albuquerque, New Mexico, USA Dewey H. Hodges dhodges@gatech.edu Professor Daniel Guggenheim School of Aerospace Engineering Atlanta, Georgia, USA

  3. Advocate- Issue 44- October 2011

    Broader source: Energy.gov [DOE]

    Here are some of the topics in this issue: UCOR Starts on K-25, Annual Planning Meeting, Recovery Act Update, and Results of the PublicvEnvironmental Survey.

  4. Advocate- Issue 61- Jan. 2016

    Broader source: Energy.gov [DOE]

    Here are some of the topics in this issue: DOE Launches K-25 Virtual Museum, Manhattan Project National Park Established, ORSSAB Celebrates 20 Years.

  5. Advocate- Issue 61- Jan. 2016

    Broader source: Energy.gov [DOE]

    Here are some topics in this issue: DOE Launches K-25 Virtual Museum, Manhattan Project National Park Established, ORSSAB Celebrates 20 Years.

  6. Advocate- Issue 52- October 2013

    Broader source: Energy.gov [DOE]

    Here are just some of the stories featured in this issue: Agency Suggestions for FY 2014, Historic Preservation of K-25, and Member Profile - Jimmy Bell

  7. Advocate- Issue 45- January 2012

    Broader source: Energy.gov [DOE]

    Here are some of the topics in this issue: Member Profile: Chuck Jensen, Chairs Videoconference, DOE/NNSA Appeal Y-12 Pollutant Discharge Permit.

  8. Advocate- Issue 48- October 2012

    Broader source: Energy.gov [DOE]

    Here are some of the topics from this issue: K-25 Historic Preservation Agreement, the Board Says Farewell to Maggie Owen, and Groundwater Study Proposed.

  9. Advocate- Issue 42- April 2011

    Broader source: Energy.gov [DOE]

    Here are some of the topics in this issue: Membership Drive, Member Profile: Betty Jones, Chuck Jenkins Recognized, DOE Rethinks U-233 Project, and Membership Changes.

  10. Smart-Grid Security Issues

    SciTech Connect (OSTI)

    Khurana, Himanshu; Hadley, Mark D.; Lu, Ning; Frincke, Deborah A.

    2010-01-29

    TITLE: Smart-Grid Security Issues (Editorial Material, English) IEEE SECURITY & PRIVACY 8 (1). JAN-FEB 2010. p.81-85 IEEE COMPUTER SOC, LOS ALAMITOS

  11. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Sas-Jaworsky, A. II )

    1991-12-01

    This article outlines the minimum safety requirements that should be considered for onshore and offshore oil well service operations with coiled tubing equipment. These guidelines comply with Minerals Management Service (MMS) regulations issued on May 31, 1988, for offshore work. Where specific MMS regulations are sited, the regulation reference, Incident of Non-Compliance (INC), number is provided. These guidelines can be used by operators and contractors, and although U.S. offshore operations are emphasized, they are applicable wherever coiled tubing services are used.

  12. BARRIER ISSUES TO THE UTILIZATION OF BIOMASS

    SciTech Connect (OSTI)

    Greg F. Weber; Christopher J. Zygarlicke

    2001-05-01

    In summary, stoker-fired boilers that cofire or switch to biomass fuel may potentially have to deal with ash behavior issues such as production of different concentrations and quantities of fine particulate or aerosols and ash-fouling deposition. Stoker boiler operators that are considering switching to biomass and adding potential infrastructure to accommodate the switch may also at the same time be looking into upgrades that will allow for generating additional power for sale on the grid. This is the case for the feasibility study being done currently for a small (<1-MW) stoker facility at the North Dakota State Penitentiary, which is considering not only the incorporation of a lower-cost biomass fuel but also a refurbishing of the stoker boiler to burn slightly hotter with the ability to generate more power and sell excess energy on the grid. These types of fuel and boiler changes can greatly affect ash behavior issues.

  13. Overview of the earth mounded concrete bunker prototype license application project: Objectives and approach

    SciTech Connect (OSTI)

    Conner, J.E.

    1989-11-01

    This paper presents an overview of the objectives and approach taken in developing the Earth-mounded Concrete Bunker Prototype License Application Project. The Prototype License Application Project was initiated by the Department of Energy`s National Low-Level Waste Management Program in early 1987 and completed in November 1988. As part of this project a prototype safety analysis report was developed. The safety analysis report evaluates the licensibility of an earth-mounded concrete bunker for a low-level radioactive waste (LLW) disposal facility located on a hypothetical site in the northeastern United States. The project required approximately five person-years and twenty months to develop.

  14. Assessment of SPEAR-FCODE-BETA for fuel licensing. Final report. [PWR; BWR

    SciTech Connect (OSTI)

    Bradley, E.R.; Lanning, D.D.; Fiero, I.B.; Freeburn, H.R.; Garde, A.M.; Krammen, M.A.; Rotondo, P.L.

    1983-03-01

    The EPRI FCODE-BETA fuel performance code is the mechanistic model portion for the SPEAR-BETA fuel reliability code, which was developed for EPRI by Entropy Limited. FCODE-BETA was assessed by Battelle, Pacific Northwest Laboratories, and Combustion Engineering, Inc., for adequacy in simulating fuel performance in fuel licensing proceedings. The assessment included a detailed review of those thermal and mechanical performance models of greatest importance to fuel licensing, including fission gas release, fuel temperatures, and cladding uniform strain. It was concluded that the code is inadequate for licensing calculations in its present form. Recommendations for modeling and usability improvements are made.

  15. Categorical Exclusion Determinations: Idaho Operations Office | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Idaho Operations Office Categorical Exclusion Determinations: Idaho Operations Office Categorical Exclusion Determinations issued by Idaho Operations Office. DOCUMENTS AVAILABLE FOR DOWNLOAD May 26, 2015 CX-013669: Categorical Exclusion Determination Advanced Test Reactor 2A Loop Chemistry Control CX(s) Applied: B3.6 Date: 05/26/2015 Location(s): Idaho Offices(s): Idaho Operations Office May 20, 2015 CX-013673: Categorical Exclusion Determination Advanced Test Reactor Complex

  16. Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (~ii~,Richland Operations Office ~Z4TESO~Richland, Washington 99352 SEP 2 2009 CERTIFIED MAIL Ms. Sarah Washburn Heart of America Northwest 1314 N.E. 5 6 th Street Suite 100 Seattle, Washington 98105 Dear Ms. Washburn: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0067) You requested, pursuant to the Freedom of Information Act (FOJA), the following documents relating to: 1 . "The authorization, decision to use, and actual use of any and all pesticides and herbicides anywhere within the

  17. Global strategies for environmental issues

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This is the 19th Annual NAEP conference proceedings, containing abstracts of oral presentations and poster sessions. Broad areas covered include the following: Environmental Management; Biodiversity/sustainable development; Gulf Regional Issues; Environmental ethics/equity; NEPA workshop and symposium; International environmental issues; global Environmental Effects; Risk Assessment; and Environmental effects of nuclear waste management.

  18. Model and Analytic Processes for Export License Assessments

    SciTech Connect (OSTI)

    Thompson, Sandra E.; Whitney, Paul D.; Weimar, Mark R.; Wood, Thomas W.; Daly, Don S.; Brothers, Alan J.; Sanfilippo, Antonio P.; Cook, Diane; Holder, Larry

    2011-09-29

    This paper represents the Department of Energy Office of Nonproliferation Research and Development (NA-22) Simulations, Algorithms and Modeling (SAM) Program's first effort to identify and frame analytical methods and tools to aid export control professionals in effectively predicting proliferation intent; a complex, multi-step and multi-agency process. The report focuses on analytical modeling methodologies that alone, or combined, may improve the proliferation export control license approval process. It is a follow-up to an earlier paper describing information sources and environments related to international nuclear technology transfer. This report describes the decision criteria used to evaluate modeling techniques and tools to determine which approaches will be investigated during the final 2 years of the project. The report also details the motivation for why new modeling techniques and tools are needed. The analytical modeling methodologies will enable analysts to evaluate the information environment for relevance to detecting proliferation intent, with specific focus on assessing risks associated with transferring dual-use technologies. Dual-use technologies can be used in both weapons and commercial enterprises. A decision-framework was developed to evaluate which of the different analytical modeling methodologies would be most appropriate conditional on the uniqueness of the approach, data availability, laboratory capabilities, relevance to NA-22 and Office of Arms Control and Nonproliferation (NA-24) research needs and the impact if successful. Modeling methodologies were divided into whether they could help micro-level assessments (e.g., help improve individual license assessments) or macro-level assessment. Macro-level assessment focuses on suppliers, technology, consumers, economies, and proliferation context. Macro-level assessment technologies scored higher in the area of uniqueness because less work has been done at the macro level. An approach to

  19. Operating Experience Summary- 2012-03 – August 14, 2012

    Broader source: Energy.gov [DOE]

    Inside this issue: Operating Experience from Cerro Grande and Las Conchas Fires Improves Los Alamos National Laboratory Emergency Preparedness and Response to Wildfire Events - Page 1

  20. PETC Review, Issue 4, Fall 1991

    SciTech Connect (OSTI)

    Blaustein, B.D.; Reiss, J.; Tarquinio, M.A.; Brown, J.; Evans, E.

    1991-12-31

    In this issue of PETC Review, short discussion is given on the following topics: (1) ``Combustion 2000``--a low-emission boiler system coupled to a high-performance power system; (2) ``Liquid Transportation Fuels from Coal, Part 2: Indirect Liquefaction``--outline research program; (3) ``A Computer Expert System to Reduce Power Plant Emissions``--a system being developed to predict the economic, operational, and environmental benefits of using commercially achievable cleaned coals; (4) ``PETC`s Flow Analysis Laboratory Assists Artificial Heart Research``--PETC equipment used to study the flow of blood in artificial hearts. Supplemental sections on events, special focuses, calendars, publication lists, etc. are also included.

  1. PETC Review, Issue 4, Fall 1991

    SciTech Connect (OSTI)

    Blaustein, B D; Reiss, J; Tarquinio, M A; Brown, J; Evans, E

    1991-10-01

    In this issue of PETC Review, short discussion is given on the following topics: (1) Combustion 2000''--a low-emission boiler system coupled to a high-performance power system; (2) Liquid Transportation Fuels from Coal, Part 2: Indirect Liquefaction''--outline research program; (3) A Computer Expert System to Reduce Power Plant Emissions''--a system being developed to predict the economic, operational, and environmental benefits of using commercially achievable cleaned coals; (4) PETC's Flow Analysis Laboratory Assists Artificial Heart Research''--PETC equipment used to study the flow of blood in artificial hearts. Supplemental sections on events, special focuses, calendars, publication lists, etc. are also included.

  2. Task 4 - EMI/RFI Issues Potentially Impacting Electromagnetic Compatibility of I&C Systems (NRCHQ6014D0015)

    SciTech Connect (OSTI)

    Wood, Richard Thomas; Ewing, Paul D.

    2015-05-01

    The U.S. Nuclear Regulatory Commission’s (NRC’s) regulations in Part 50, “Domestic Licensing of Production and Utilization Facilities,” of Title 10 of the Code of Federal Regulations (10 CFR Part 50) state that structures, systems, and components important to safety in a nuclear power plant are to be designed to accommodate the effects of environmental conditions (i.e., remain functional under all postulated service conditions) and that design control measures such as testing are to be used to check the adequacy of design. Regulatory Guide (RG) 1.180 was developed to provide guidance to licensees and applicants on methods acceptable to the NRC staff for complying with the NRC’s regulations on design, installation, and testing practices for addressing the effects of electromagnetic and radio-frequency interference (EMI/RFI) and power surges on safety-related instrumentation and control (I&C) systems. The first revision of RG 1.180 was issued in January 2000 and a second revision was issued in October 2003*. The second revision differed from the first revision in endorsing Military Standard (MIL-STD)-461E and the International Electrotechnical Commission (IEC) Standard (Std) 61000 series of EMI/RFI test methods, extending the guidance to cover signal line testing, incorporating frequency ranges where portable communications devices are experiencing increasing use, and relaxing the operating envelopes (test levels) when experience and confirmatory research warranted. It also offered exemptions from specific test criteria based on technical considerations such as plant conditions and the intended location of the safety-related I&C equipment. Since the last revision, new requirements have been identified, associated RGs have been created and updated, and additional industry guidance has been developed. Additionally, the operational environment has changed with the increase in wireless communication technology for both personal (smartphone) and industrial

  3. Sodium fast reactor safety and licensing research plan. Volume II.

    SciTech Connect (OSTI)

    Ludewig, H.; Powers, D. A.; Hewson, John C.; LaChance, Jeffrey L.; Wright, A.; Phillips, J.; Zeyen, R.; Clement, B.; Garner, Frank; Walters, Leon; Wright, Steve; Ott, Larry J.; Suo-Anttila, Ahti Jorma; Denning, Richard; Ohshima, Hiroyuki; Ohno, S.; Miyhara, S.; Yacout, Abdellatif; Farmer, M.; Wade, D.; Grandy, C.; Schmidt, R.; Cahalen, J.; Olivier, Tara Jean; Budnitz, R.; Tobita, Yoshiharu; Serre, Frederic; Natesan, Ken; Carbajo, Juan J.; Jeong, Hae-Yong; Wigeland, Roald; Corradini, Michael; Thomas, Justin; Wei, Tom; Sofu, Tanju; Flanagan, George F.; Bari, R.; Porter D.; Lambert, J.; Hayes, S.; Sackett, J.; Denman, Matthew R.

    2012-05-01

    Expert panels comprised of subject matter experts identified at the U.S. National Laboratories (SNL, ANL, INL, ORNL, LBL, and BNL), universities (University of Wisconsin and Ohio State University), international agencies (IRSN, CEA, JAEA, KAERI, and JRC-IE) and private consultation companies (Radiation Effects Consulting) were assembled to perform a gap analysis for sodium fast reactor licensing. Expert-opinion elicitation was performed to qualitatively assess the current state of sodium fast reactor technologies. Five independent gap analyses were performed resulting in the following topical reports: (1) Accident Initiators and Sequences (i.e., Initiators/Sequences Technology Gap Analysis), (2) Sodium Technology Phenomena (i.e., Advanced Burner Reactor Sodium Technology Gap Analysis), (3) Fuels and Materials (i.e., Sodium Fast Reactor Fuels and Materials: Research Needs), (4) Source Term Characterization (i.e., Advanced Sodium Fast Reactor Accident Source Terms: Research Needs), and (5) Computer Codes and Models (i.e., Sodium Fast Reactor Gaps Analysis of Computer Codes and Models for Accident Analysis and Reactor Safety). Volume II of the Sodium Research Plan consolidates the five gap analysis reports produced by each expert panel, wherein the importance of the identified phenomena and necessities of further experimental research and code development were addressed. The findings from these five reports comprised the basis for the analysis in Sodium Fast Reactor Research Plan Volume I.

  4. Title 18 CFR 4.200 et seq. Application for Amendment of License...

    Open Energy Info (EERE)

    OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 CFR 4.200 et seq. Application for Amendment of LicenseLegal Abstract Regulations providing for...

  5. Title 7 CFR 1.601 et seq. Conditions in FERC Hydropower Licenses...

    Open Energy Info (EERE)

    7 CFR 1.601 et seq. Conditions in FERC Hydropower Licenses Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 7 CFR...

  6. NSNFP Activities in Support of Repository Licensing for Disposal of DOE SNF

    SciTech Connect (OSTI)

    Henry H. Loo; Brett W.. Carlsen; Sheryl L. Morton; Larry L. Taylor; Gregg W. Wachs

    2004-09-01

    The U.S. Department of Energy (DOE) Office of Civilian Radioactive Waste Management is in the process of preparing the Yucca Mountain license application for submission to the Nuclear Regulatory Commission as the nation’s first geologic repository for spent nuclear fuel (SNF) and high-level waste. Because the DOE SNF will be part of the license application, there are various components of the license application that will require information relative to the DOE SNF. The National Spent Nuclear Fuel Program (NSNFP) is the organization that directs the research, development, and testing of treatment, shipment, and disposal technologies for all DOE SNF. This report documents the work activities conducted by the NSNFP and discusses the relationship between these NSNFP technical activities and the license application. A number of the NSNFP activities were performed to provide risk insights and understanding of DOE SNF disposal as well as to prepare for anticipated questions from the regulatory agency.

  7. Colorado - C.R.S. 24-4-101 et seq., Rule-making and Licensing...

    Open Energy Info (EERE)

    Colorado - C.R.S. 24-4-101 et seq., Rule-making and Licensing Procedures by State Agencies Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  8. Colorado - C.R.S. 24-4-104, Licenses-issuance, suspension, or...

    Open Energy Info (EERE)

    Colorado - C.R.S. 24-4-104, Licenses-issuance, suspension, or revocation, renewal Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute:...

  9. Title 18 CFR Subpart G Application for License for Minor Water...

    Open Energy Info (EERE)

    G Application for License for Minor Water Power Projects and Major Water Power Projects 5 Megawatts or Less Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal...

  10. Title 18 CFR Subpart E Application for License for Major Unconstructed...

    Open Energy Info (EERE)

    Title 18 CFR Subpart E Application for License for Major Unconstructed Project and Major Modified Project Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal...

  11. Title 18 CFR 6.2 Surrender of License | Open Energy Information

    Open Energy Info (EERE)

    Title 18 CFR 6.2 Surrender of License Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 CFR 6.2 Surrender of...

  12. Title 43 CFR 3273 How To Apply for a Site License | Open Energy...

    Open Energy Info (EERE)

    Title 43 CFR 3273 How To Apply for a Site License Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43...

  13. Title 18 CFR Subpart F Application for License for Major Project...

    Open Energy Info (EERE)

    CFR Subpart F Application for License for Major Project -- Existing Dam Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation:...

  14. Open Discussion of Freeze Related Issues | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Discussion of Freeze Related Issues Open Discussion of Freeze Related Issues Presentation by Doug Wheeler to DOE's Fuel Cell Operations at Sub-Freezing Temperatures Workshop held February 1-5, 2005 in Phoenix, Arizona. 10_wheeler_discussion.pdf (223.65 KB) More Documents & Publications A Study on Performance Degradation of PEMFC by Water Freezing Fuel Cell Freeze Workshop Agenda WA_02_036_DE_NORA_NORTH_AMERICA_Waiver_of_Domestic_and_Foreg.pdf

  15. DOE Issues RFP for Waste Treatment Services | Department of Energy

    Office of Environmental Management (EM)

    Greater-Than-Class C Waste | Department of Energy Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste DOE Issues Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste February 25, 2016 - 3:30pm Addthis WASHINGTON, D.C. - The U.S. Department of Energy (DOE) today issued a Final Environmental Impact Statement (EIS) that evaluates the potential environmental impacts associated with the proposed development, operation, and long-term

  16. Issues in workforce composition analysis

    SciTech Connect (OSTI)

    Koeck, D.C.; Rogers, J.D.

    1996-05-01

    An issue of paramount interest to US industry is the supply and quality of human resources available for this country`s scientific and technological activities. The changing composition of the workforce and the responsibility that an organization has to assure equal opportunity, give rise to various issues. This paper discusses some of the issues associated with the scientific and technical workforce. Specifically, it explores some of the questions pertaining to workforce composition and measures of workforce composition. This paper should be useful to those responsible for personnel policies.

  17. Breakthrough Los Alamos software is available for licensing

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Begins Full-Scale Operations | Department of Energy Breakthrough Industrial Carbon Capture, Utilization and Storage Project Begins Full-Scale Operations Breakthrough Industrial Carbon Capture, Utilization and Storage Project Begins Full-Scale Operations May 10, 2013 - 11:36am Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON - The Energy Department's Acting Assistant Secretary for Fossil Energy Christopher Smith today attended a dedication ceremony at the Air Products and Chemicals

  18. Mr. William f. Crow, Acting Director . Uranium Fuel Licensing...

    Office of Legacy Management (LM)

    ... Director Division of Facility and Site Decomnlssioning Projects Office of Nuclear Energy 3 ... C-3725 (Source Material) Oescription of Operations: Production scale briquetting of green ...

  19. Calutron Operations | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Calutron Operations

  20. Advocate- Issue 43- July 2011

    Broader source: Energy.gov [DOE]

    Here are some of the topics in this issue: Retiring Members Honored, Member Profile: David Martin, EM SSAB Chairs Meeting, Board Member’s Company Assists with Japanese Nuclear Plant.

  1. Workers' Spotlight Newsletter- Issue 3

    Office of Energy Efficiency and Renewable Energy (EERE)

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. January 2013 issue covers National Supplemental Screening Program and What's going on around the Complex.

  2. Workers' Spotlight Newsletter- Issue 4

    Broader source: Energy.gov [DOE]

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. February 2013 issue covers John Hopkins University Former Worker Program.

  3. Advocate- Issue 50- April 2013

    Broader source: Energy.gov [DOE]

    Here are some stories from this issue: Legacy Waste on the Oak Ridge Reservation, K-25's North Tower Demolished, Agency for Toxic Substances and Disease Registry Meets in Oak Ridge, and a Profile on Dave Hemelright.

  4. Automotive Thermoelectric Generator Design Issues

    Office of Energy Efficiency and Renewable Energy (EERE)

    Mechanical, electrical, thermal engineering, and durability issues related to use of TEGs in the challenging automotive environment need to be resolved as they affect warranty cost and customer acceptance.

  5. Advocate- Issue 63- July 2016

    Office of Energy Efficiency and Renewable Energy (EERE)

    Special topics in this issue include DOE's alternatives for increased waste disposal capacity, ORSSAB's recommendation to DOE on the FY 2018 budget request, and progress on the K-27 demolition.

  6. Workers' Spotlight Newsletter- Issue 7

    Broader source: Energy.gov [DOE]

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. May 2013 issue covers WHPP and BTMed Roster Updates and WHPP Video Acknowledgement.

  7. Advocate- Issue 60- October 2015

    Broader source: Energy.gov [DOE]

    Here are some of the topics in this issue: ORSSAB has annual meeting; EM SSAB Chairs meet in Santa Fe; ORSSAB member participates in EPA Community Involvement Conference; ORSSAB members go into the field.

  8. Petroleum 1996: Issues and Trends

    Reports and Publications (EIA)

    1997-01-01

    Examines historical trends and focuses on major petroleum issues and the events they represent. It analyzes different dimensions of the petroleum industry and related markets in terms of how they relate to the volatility in petroleum markets.

  9. Microsoft PowerPoint - Nuclear Material Import Export License … Uses & Reporting processes_Gary Langlie_Karen Antizzo [Compatib

    National Nuclear Security Administration (NNSA)

    Material Import/Export License - Uses & Reporting processes Gary Langlie - Nuclear Regulatory Commission Karen Antizzo - Link Technologies Overview  What is a Nuclear Regulatory Commission (NRC) import/export license? - Licenses for imports - Licenses for exports - Export license monitoring  Highlights of imports/exports in 2014 - Nuclear material imported to the U.S. - Nuclear material exported from the U.S. - Types of materials shipped - Typical uses and applications  What is

  10. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... recognize and respond to a variety of problems and anomalies; to understand complex ... a basis for hazard surveys used for safety analysis, emergency planning, and work planning. ...

  11. ISSUED

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technical Assistance » ISO 50001 Energy Management Standard ISO 50001 Energy Management Standard The ISO 50001 energy management standard is a proven framework for industrial facilities, commercial facilities, or entire organizations to manage energy-including all aspects of energy procurement and use. An energy management system establishes the structure and discipline to implement technical and management strategies that significantly cut energy costs and greenhouse gas emissions-and sustain

  12. Issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    01 October 2004 Remembering the B-Complex Piece by piece it was decommissioned through the summer of 2004. August, when the bulldozers arrived to tear down all that remained of buildings B-1 and B-2. 650 NNSA/NSO contractor employees lay in the parking lot, a heap of rubble and debris. The demolition of buildings B-1 and B-2 in the NNSA/NSO Nevada Support Facility complex surprised no one. The buildings were the subject of a lengthy investigation after it was revealed, in March 2002, that a

  13. Issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 November 2006 A publication for all members of the NNSA/NSO family ear Admiral Gerald L. Talbot, Jr. has been named as the new manager of the National Nuclear Security Administration's Nevada Site Office. Upon his retirement, after serving 35-years in the United States Navy, Rear Admiral Talbot will assume his new position in January, 2007. He succeeds Kathy A. Carlson, who retired in May 2006. Rear Admiral Talbot currently serves as the Director, Military Personnel Plans and Policy Division.

  14. Issue

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 December 06/January 2007 H a p p y H o l i d a y s t o o u r N S O f a m i l y n November, the National Nuclear Security Administration (NNSA) conducted two public meetings in Nevada as part of the preparation of the Supplement to the Stockpile Stewardship and Management Programmatic Environmental Impact Statement - Complex 2030. The first meeting on Nov. 28 at Cashman Center in Las Vegas observed an "open-house" format, allowing the public to view information displays, ask questions

  15. NGNP Composites R&D Technical Issues Study

    SciTech Connect (OSTI)

    AREVA Federal Services

    2008-09-01

    This study identifies potential applications and design requirements for ceramic materials (CMs) and ceramic composite materials (CCMs) in the NGNP hightemperature gas-cooled reactor (HTGR) primary circuit. Components anticipated for fabrication from non-graphite CMs and CCMs are identified along with recommended normal and off-normal operating conditions. The evaluation defines required dimensions and material properties of the candidate materials for normal operating conditions (NOC), anticipated transients, abnormal events, and design basis events. The report also identifies additional activities required for codifying the selected materials. The activities include ASTM Standard and ASME Code development and other work to support NRC licensing of the plant. Evaluation of the NGNP baseline design indicates components requiring either CMs or CCMs depend upon the reactor operating temperatures. For a reactor outlet temperature of 900 oC, four of the five evaluated components would benefit from either CMs or CCMs. Although some thermal and mechanical data exist for most of the candidate materials, they all need additional irradiation, thermal, and mechanical testing. The codification process must take into account the type of material and the geometry of components using either CMs or CCMs. The process requires close integration of the design and the research and development (R&D) program, which has already started by using preliminary control rod component designs as the basis for establishing specimen geometry and test conditions. The remaining time and budget for completing the R&D program need further assessment.

  16. Development and Assessment of the Appendix K Version of RELAP5-3D for LOCA Licensing Analysis

    SciTech Connect (OSTI)

    Liang, Thomas K.S.; Chang, C.-J.; Hung, H.-J

    2002-09-15

    In light water reactors, particularly the pressurized water reactor (PWR), the severity of a loss-of-coolant accident (LOCA) would limit how high the reactor power can operate. Although the best-estimate LOCA licensing methodology can provide the greatest margin on the peak cladding temperature (PCT) evaluation during a LOCA, it generally takes much more resources to develop. Instead, implementation of evaluation models required by Appendix K of 10CFR50 on an advanced thermal-hydraulic platform such as RELAP5, TRAC, etc., also can gain significant margin for the PCT calculation. Through compliance evaluation against Appendix K of 10CFR50, all of the required evaluation models have been implemented in RELAP5-3D. To verify and assess the development of the Appendix K version of RELAP5-3D, nine kinds of separate-effects experiments and eight sets of LOCA integral experiments were adopted. Through the assessments against separate-effects experiments, the success of the code modification in accordance with Appendix K of 10CFR50 was demonstrated. Besides, one set of a typical integral large-break LOCA from Loss-of-Fluid Test Facility experiments (L2-5) has also been applied to preliminarily evaluate the integral performance of the Appendix K version of RELAP5-3D. The PCT predicted by the evaluation models is greater than the one from best-estimate calculation in the whole LOCA history with the conservatism of 150 K, and the measured PCTs of L2-5 are also well bounded by the evaluation model calculation. Another seven sets of integral-effect experiments will be further applied in the next step to ensure the reasonable integral conservatism of the newly developed LOCA licensing analysis code (RELAP5-3DK/INER), which can cover all the phases of both large- and small LOCA in one code.

  17. Key Issues | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Key Issues Key Issues The following presentations offer information about other key topics related to high performance homes. wall_system_innovations_kochkin.pdf (1.48 MB) removing_codes_barriers_cole.pdf (479.86 KB) testing_residential_ariconditioners_booten_winkler.pdf (5.21 MB) code_gaps_combustion_safety.pdf (1.34 MB) automated_utility_bill_calibration_polly.pdf (1.64 MB) predicting_envelope_leakage_griffiths.pdf (1.63 MB) More Documents & Publications Code Gaps and Future Research Needs

  18. Policy Flash 2013-26 Guidance for tracking inquiries related to the licensing of inventions developed at DOE facilities

    Broader source: Energy.gov [DOE]

    Attached is Policy Flash 2013-26 Guidance for tracking inquiries related to the licensing of inventions developed at DOE facilities

  19. Statement from U.S. Secretary of Energy Samuel W. Bodman Regarding the Docketing of DOE's Yucca Mountain License Application

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - Today, September 8, 2008, the Nuclear Regulatory Commission (NRC) announced it has docketed the U.S. Department of Energy's (DOE) Yucca Mountain license application seeking...

  20. Lessons Learned Quarterly Report; March 3, 2003; Issue No. 34...

    National Nuclear Security Administration (NNSA)

    Mixed Oxide (MOX) Fuel Fabrication Facility at DOE's Savannah River Site in South Carolina. ... terrorism in generic environmental reviews for nuclear power plant license renewal." ...

  1. Tritium Issues in Next Step Devices

    SciTech Connect (OSTI)

    C.H. Skinner; G. Federici

    2001-09-05

    Tritium issues will play a central role in the performance and operation of next-step deuterium-tritium (DT) burning plasma tokamaks and the safety aspects associated with tritium will attract intense public scrutiny. The orders-of-magnitude increase in duty cycle and stored energy will be a much larger change than the increase in plasma performance necessary to achieve high fusion gain and ignition. Erosion of plasma-facing components will scale up with the pulse length from being barely measurable on existing machines to centimeter scale. Magnetic Fusion Energy (MFE) devices with carbon plasma-facing components will accumulate tritium by co-deposition with the eroded carbon and this will strongly constrain plasma operations. We report on a novel laser-based method to remove co-deposited tritium from carbon plasma-facing components in tokamaks. A major fraction of the tritium trapped in a co-deposited layer during the deuterium-tritium (DT) campaign on the Tokamak Fusion Test Reactor (TFTR) was released by heating with a scanning laser beam. This technique offers the potential for tritium removal in a next-step DT device without the use of oxidation and the associated deconditioning of the plasma-facing surfaces and expense of processing large quantities of tritium oxide. The operational lifetime of alternative materials such as tungsten has significant uncertainties due to melt layer loss during disruptions. Production of dust and flakes will need careful monitoring and minimization, and control and accountancy of the tritium inventory will be critical issues. Many of the tritium issues in Inertial Fusion Energy (IFE) are similar to MFE, but some, for example those associated with the target factory, are unique to IFE. The plasma-edge region in a tokamak has greater complexity than the core due to lack of poloidal symmetry and nonlinear feedback between the plasma and wall. Sparse diagnostic coverage and low dedicated experimental run time has hampered the

  2. EM Issues Amended Decision to Expand Use of Nuclear Facility

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – EM issued an amended Record of Decision (ROD) to the Savannah River Site (SRS) Spent Nuclear Fuel Environmental Impact Statement to expand the operations of the H-Canyon Facility at SRS to support a major nuclear non-proliferation goal and save taxpayer dollars.

  3. DOE Issues Draft RFP for Hanford Site Lab Services

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP), 100 percent set-aside for small businesses, for the operation and performance of analytical and testing services at the DOE Hanford 222-S Lab.

  4. DOE Issues Final RFP for Hanford Site Lab Services

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP), 100 percent set-aside for small businesses, for the operation and performance of analytical and testing services at the DOE Hanford 222-S Lab. A Draft RFP was previously released on February 28, 2014, requesting comments from industry.

  5. Application of the IBERDROLA RETRAN Licensing Methodology to the Confrentes BWR-6 110% Extended Power Uprate

    SciTech Connect (OSTI)

    Fuente, Rafael de la; Iglesias, Javier; Sedano, Pablo G.; Mata, Pedro

    2003-04-15

    IBERDROLA (Spanish utility) and IBERDROLA INGENIERIA (engineering branch) have been developing during the last 2 yr the 110% Extended Power Uprate Project for Cofrentes BWR-6. IBERDROLA has available an in-house design and licensing reload methodology that has been approved in advance by the Spanish Nuclear Regulatory Authority. This methodology has been applied to perform the nuclear design and the reload licensing analysis for Cofrentes cycles 12 and 13 and to develop a significant number of safety analyses of the Cofrentes Extended Power.Because the scope of the licensing process of the Cofrentes Extended Power Uprate exceeds the range of analysis included in the Cofrentes generic reload licensing process, it has been required to extend the applicability of the Cofrentes RETRAN model to the analysis of new transients. This is the case of the total loss of feedwater (TLFW) transient.The content of this paper shows the benefits of having an in-house design and licensing methodology and describes the process to extend the applicability of the Cofrentes RETRAN model to the analysis of new transients, particularly in this paper the TLFW transient.

  6. The NRC's SPAR Models: Current Status, Future Development, and Modeling Issues

    SciTech Connect (OSTI)

    Robert F. Buell

    2008-09-01

    Probabilistic risk assessments (PRAs) play an increasingly important role in the regulatory framework of the U.S. nuclear power industry. The Nuclear Regulatory Commission (NRC) relies on a set of plant-specific Standardized Plant Analysis Risk (SPAR) models to provide critical risk-based input to the regulatory process. The Significance Determination Process (SDP), Management Directive 8.3 - NRC Incident Investigation Program, Accident Sequence Precursor (ASP) and Mitigating Systems Performance Index (MSPI) programs are among the regulatory initiatives that receive significant input from the SPAR models. Other uses of the SPAR models include: Screening & Resolution of Generic Safety Issues, License Amendment reviews and Notice of Enforcement Discretion (NOEDs). This paper presents the current status of SPAR model development activities, future development objectives, and issues related to the development, verification and maintenance of the SPAR models.

  7. Workers' Spotlight Newsletter- Issue 13

    Broader source: Energy.gov [DOE]

    Worker's Spotlight Newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. May/June 2014 issue covers the Director's Note, the Cold War Patriots' Remembrance Quilt, Staff, the National Museum of Nuclear Science and History, Chest X-ray B-reading, and Calendar of Events.

  8. Workers' Spotlight Newsletter- Issue 5

    Office of Energy Efficiency and Renewable Energy (EERE)

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. March 2013 issue covers Former Worker Medical Screening Program 2012 Annual Report and University of Iowa - Former Worker Program.

  9. Workers' Spotlight Newsletter- Issue 2

    Office of Energy Efficiency and Renewable Energy (EERE)

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. December 2012 issue covers Updating the Site Exposure Matrices (SEM) and the summary of the 2012 Advanced Ethical Research Conference.

  10. Workers' Spotlight Newsletter- Issue 9

    Broader source: Energy.gov [DOE]

    Workers’ Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. September/October 2013 issue covers Former Worker Medical Screening Program Milestone, United States Preventive Services Task Force (USPSTF) and John Hopkins Former Worker Program in New Mexico.

  11. Workers' Spotlight Newsletter- Issue 12

    Broader source: Energy.gov [DOE]

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. March/April 2014 issue covers Joint Outreach Task Group town hall meeting video, the Bradbury Science Museum, and spirometry.

  12. Workers' Spotlight Newsletter- Issue 8

    Broader source: Energy.gov [DOE]

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Screening Program. July/August issue covers Site Information Sessions, Joint Outreach Task Group Meeting, and National Supplemental Screening Program Low-Dose CT Program.

  13. Workers' Spotlight Newsletter- Issue 14

    Office of Energy Efficiency and Renewable Energy (EERE)

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. July/August/September issue covers Director's Note, 2014 Sylvia Kieding Award, National Atomic Testing Museum, and Calendar of Events.

  14. Advocate- Issue 56- October 2014

    Broader source: Energy.gov [DOE]

    Here are some of the stories in this issue: ORSSAB held its annual meeting and learned about a number of decisions that will be made in 2015, EM SSAB Chairs meet in Idaho, DOE Responds to recommendations, ORSSAB is recruiting new members, ORSSAB elects officers for FY 2015.

  15. Advocate- Issue 55-July 2014

    Office of Energy Efficiency and Renewable Energy (EERE)

    Here are some of the stories in this issue: TWPC Continues Processing Transuranic Waste During Suspension of Repository Activities, DOE Develops a Mercury Remediation Strategic Plan for Y-12, EM SSAB Representatives Gather for Semiannual Meeting, Report on Environmental Justice Conference, New Students, ORSSAB Member Honored.

  16. Advocate- Issue 54- April 2014

    Office of Energy Efficiency and Renewable Energy (EERE)

    Here are some of the stories in this issue: DOE Encourages ORSSAB Input on Second Waste Disposal Facility, ORSSAB/Public Were Involved in Siting EMWMF, Board Member Reports on Waste Management Symposia, and Public Environmental Survey Gathers Input on Cleanup Strategy.

  17. Workers' Spotlight Newsletter- Issue 11

    Office of Energy Efficiency and Renewable Energy (EERE)

    Worker's Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. January/February 2014 issue covers audiogram, the American Museum of Science and Energy, and trivia.

  18. Workers' Spotlight Newsletter- Issue 10

    Office of Energy Efficiency and Renewable Energy (EERE)

    Workers' Spotlight newsletter is a monthly publication that provides information regarding the Energy Employees Occupational Illness Compensation Program and the Former Worker Medical Screening Program. November / December 2013 issue covers Remembrance, Beryllium, Secure Electronic Records Transfer (SERT), and Commemorating DOE Former Workers.

  19. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, appeal board and licensing board decisions, July 1972--June 1996. Digest Number 8

    SciTech Connect (OSTI)

    1997-07-01

    This is the eighth edition of the NRC Staff Practice and Procedure Digest. It contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 1996 interpreting the NRC`s Rules of Practice in 10 CFR Part 2. Although the Appeal Board was abolished in 1991, Appeal Board precedent, to the extent it is consistent with more recent case law and rule changes, may still be cited. This eighth edition of the Digest replaces earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through June 1996. The Practice and Procedure Digest was originally prepared by NRC attorneys as an internal research tool. Because of its proven usefulness to those attorneys, it was decided that it might also prove useful to members of the public and practitioners before the NRC. Accordingly, the decision was made to publish the digest and subsequent editions thereof. This current edition of the Digest was prepared by staff members of the Office of General Counsel and the Office of Commission Appellate Adjudication.

  20. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... license application process including NuScale Power (NuScale Power Module), Babcock and Wilcox (mPower), and Mitsubishi Heavy Industries (U.S.-Advanced Pressurized Water Reactor). ...

  1. Tritium Ground Water Issues | Department of Energy

    Office of Environmental Management (EM)

    Ground Water Issues Tritium Ground Water Issues Presentation from the 35th Tritium Focus Group Meeting held in Princeton, New Jersey on May 05-07, 2015. Tritium Ground Water Issues ...

  2. Outage management and health physics issue, 2009

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2009-05-15

    The focus of the May-June issue is on outage management and health physics. Major articles include the following: Planning and scheduling to minimize refueling outage, by Pat McKenna, AmerenUE; Prioritizing safety, quality and schedule, by Tom Sharkey, Dominion; Benchmarking to high standards, by Margie Jepson, Energy Nuclear; Benchmarking against U.S. standards, by Magnox North, United Kingdom; Enabling suppliers for new build activity, by Marcus Harrington, GE Hitachi Nuclear Energy; Identifying, cultivating and qualifying suppliers, by Thomas E. Silva, AREVA NP; Creating new U.S. jobs, by Francois Martineau, Areva NP. Industry innovation articles include: MSL Acoustic source load reduction, by Amir Shahkarami, Exelon Nuclear; Dual Methodology NDE of CRDM nozzles, by Michael Stark, Dominion Nuclear; and Electronic circuit board testing, by James Amundsen, FirstEnergy Nuclear Operating Company. The plant profile article is titled The future is now, by Julia Milstead, Progress Energy Service Company, LLC.

  3. Plant maintenance and advanced reactors issue, 2008

    SciTech Connect (OSTI)

    Agnihotri, Newal

    2009-09-15

    The focus of the September-October issue is on plant maintenance and advanced reactors. Major articles/reports in this issue include: Technologies of national importance, by Tsutomu Ohkubo, Japan Atomic Energy Agency, Japan; Modeling and simulation advances brighten future nuclear power, by Hussein Khalil, Argonne National Laboratory, Energy and desalination projects, by Ratan Kumar Sinha, Bhabha Atomic Research Centre, India; A plant with simplified design, by John Higgins, GE Hitachi Nuclear Energy; A forward thinking design, by Ray Ganthner, AREVA; A passively safe design, by Ed Cummins, Westinghouse Electric Company; A market-ready design, by Ken Petrunik, Atomic Energy of Canada Limited, Canada; Generation IV Advanced Nuclear Energy Systems, by Jacques Bouchard, French Commissariat a l'Energie Atomique, France, and Ralph Bennett, Idaho National Laboratory; Innovative reactor designs, a report by IAEA, Vienna, Austria; Guidance for new vendors, by John Nakoski, U.S. Nuclear Regulatory Commission; Road map for future energy, by John Cleveland, International Atomic Energy Agency, Vienna, Austria; and, Vermont's largest source of electricity, by Tyler Lamberts, Entergy Nuclear Operations, Inc. The Industry Innovation article is titled Intelligent monitoring technology, by Chris Demars, Exelon Nuclear.

  4. Emergency preparedness source term development for the Office of Nuclear Material Safety and Safeguards-Licensed Facilities

    SciTech Connect (OSTI)

    Sutter, S.L.; Mishima, J.; Ballinger, M.Y.; Lindsey, C.G.

    1984-08-01

    In order to establish requirements for emergency preparedness plans at facilities licensed by the Office of Nuclear Materials Safety and Safeguards, the Nuclear Regulatory Commission (NRC) needs to develop source terms (the amount of material made airborne) in accidents. These source terms are used to estimate the potential public doses from the events, which, in turn, will be used to judge whether emergency preparedness plans are needed for a particular type of facility. Pacific Northwest Laboratory is providing the NRC with source terms by developing several accident scenarios for eleven types of fuel cycle and by-product operations. Several scenarios are developed for each operation, leading to the identification of the maximum release considered for emergency preparedness planning (MREPP) scenario. The MREPP scenarios postulated were of three types: fire, tornado, and criticality. Fire was significant at oxide fuel fabrication, UF/sub 6/ production, radiopharmaceutical manufacturing, radiopharmacy, sealed source manufacturing, waste warehousing, and university research and development facilities. Tornadoes were MREPP events for uranium mills and plutonium contaminated facilities, and criticalities were significant at nonoxide fuel fabrication and nuclear research and development facilities. Techniques for adjusting the MREPP release to different facilities are also described.

  5. Department of Energy Issues Funding Opportunity Announcement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Media contact(s): (202) 586-4940 Addthis Related Articles Department of Energy Issues ... of Energy Issues Funding Opportunity Announcements to Enhance Nuclear Energy Education

  6. Energy Department Issues Green Building Certification System...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Department Issues Green Building Certification System Final Rule to Support Increased Energy Measurement and Efficient Building Design Energy Department Issues Green...

  7. Knowledge and abilities catalog for nuclear power plant operators: Pressurized water reactors. Revision 1

    SciTech Connect (OSTI)

    1995-08-01

    This document provides the basis for the development of content-valid licensing examinations for reactor operators and senior reactor operators. The examinations developed using the PWR catalog will cover those topics listed under Title 10, (ode of Federal Regulations Part 55. The PWR catalog contains approximately 5100 knowledge and ability (K/A) statements for reactor operators and senior reactor operators. The catalog is organized into six major sections: Catalog Organization; Generic Knowledge and Abilities; Plant Systems; Emergency and Abnormal Plant Evolutions; Components and Theory.

  8. ARM - AMF2 Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Contacts Management and Operations Operations Overview ARM Links BCR | ECR ECO, EWO Extraview PIF, CAR, DQR & DQPR Operations Status System i.arm.gov AMF2 Deployment...

  9. Line Equipment Operator

    Broader source: Energy.gov [DOE]

    There are several Line Equipment Operator positions located in Washington and Oregon. A successful candidate in this position will perform Line Equipment Operator work operating trucks and all...

  10. Business Ymwet Centlsaem: Enclosed is AEC Special Nuclear Material License Yo. SW-551, as

    Office of Legacy Management (LM)

    c-ii 3-y !WL?DF!i 70.424 SW-551, 9s renewed AUG 9 196s cmhustian En&merin~, Inc. %.lelcar Division tYindter, Connecticut ,~ttentionr ?tr. 5. ff. Shfp,penbmg: Business Ymwet Centlsaem: Enclosed is AEC Special Nuclear Material License Yo. SW-551, as renewed. Very tTuly yours, fkmald A. Nusshauaer, Chief Saurce 4 Specfel Wcleer Yaterials Brmch Ofvision of Meterbls Licensing EnClOSUWl W W m , as renwed DISTRIBUTION: Ccaplianee, HQs 2 w/encl. H. j. McAlduff, OR00 w/encl. D. George, ?MM w/mcl. N.

  11. Oak Ridge National Laboratory Seeking U.S. Manufacturers to License

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low-Cost Carbon Fiber Process | Department of Energy Oak Ridge National Laboratory Seeking U.S. Manufacturers to License Low-Cost Carbon Fiber Process Oak Ridge National Laboratory Seeking U.S. Manufacturers to License Low-Cost Carbon Fiber Process March 23, 2016 - 12:46pm Addthis News release from Oak Ridge National Laboratory. OAK RIDGE, Tenn., March 22, 2016 - Researchers at the Department of Energy's Oak Ridge National Laboratory (ORNL) have demonstrated a production method they estimate

  12. Knowledge and abilities catalog for nuclear power plant operators: Boiling water reactors, Revision 1

    SciTech Connect (OSTI)

    1995-08-01

    The Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling-Water Reactors (BWRs) (NUREG-1123, Revision 1) provides the basis for the development of content-valid licensing examinations for reactor operators (ROs) and senior reactor operators (SROs). The examinations developed using the BWR Catalog along with the Operator Licensing Examiner Standards (NUREG-1021) and the Examiner`s Handbook for Developing Operator Licensing Written Examinations (NUREG/BR-0122), will cover the topics listed under Title 10, Code of Federal Regulations, Part 55 (10 CFR 55). The BWR Catalog contains approximately 7,000 knowledge and ability (K/A) statements for ROs and SROs at BWRs. The catalog is organized into six major sections: Organization of the Catalog, Generic Knowledge and Ability Statements, Plant Systems grouped by Safety Functions, Emergency and Abnormal Plant Evolutions, Components, and Theory. Revision 1 to the BWR Catalog represents a modification in form and content of the original catalog. The K/As were linked to their applicable 10 CFR 55 item numbers. SRO level K/As were identified by 10 CFR 55.43 item numbers. The plant-wide generic and system generic K/As were combined in one section with approximately one hundred new K/As. Component Cooling Water and Instrument Air Systems were added to the Systems Section. Finally, High Containment Hydrogen Concentration and Plant Fire On Site evolutions added to the Emergency and Abnormal Plant Evolutions section.

  13. Earned Value Management System (EVMS) Corrective Action Standard Operating Procedure

    Office of Environmental Management (EM)

    Corrective Action Standard Operating Procedure (ECASOP) Issued by Office of Project Management, Oversight, and Assessments (PMOA) PM-1 September 21, 2015 DEPARTMENT OF ENERGY EVMS CORRECTIVE ACTION SOP SEPTEMBER 21, 2015 ii Earned Value Management System (EVMS) Corrective Action (CA) Standard Operating Procedure (ECASOP) OPR: PM-30 Issue Date: September 21, 2015 1. PURPOSE. This EVMS Corrective Action Standard Operating Procedure (ECASOP) serves as a primary reference for PMOA PM-1 for

  14. EIS-0183: EPA Notice of Availability of the Final Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    License Renewal of Nuclear Plants, Supplement 36 to NUREG1437, Regarding Beaver Valley Power Station, Units 1 and 2, Plant Specific, Issuing Nuclear Power Plant Operating License for an Additional 20- Year Period, Pennsylvania

  15. Redesignation Order No. 00-09.01-01 to the Manager of Department of Energy Idaho Operations Office

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-05-12

    Redesignation of the Manager of the Idaho Operations Office as the representative to perform as the "authorized representative," as that term is used in the NRC regulations at 10 CFR 72.16(b), and as name holder of the NRC license under 10 CFR 72 for the Idaho Spent Fuel Facility Independent Spent Fuel Storage Installation.

  16. Operating Experience Committee Charter

    Broader source: Energy.gov [DOE]

    The Operating Experience Committee (OEC) charter provides a description of the OEC's purpose, background, membership, functions, and operations.

  17. Regulatory Safety Issues in the Structural Design Criteria of ASME Section III Subsection NH and for Very High Temperatures for VHTR & GEN IV

    SciTech Connect (OSTI)

    William J. O’Donnell; Donald S. Griffin

    2007-05-07

    The objective of this task is to identify issues relevant to ASME Section III, Subsection NH [1], and related Code Cases that must be resolved for licensing purposes for VHTGRs (Very High Temperature Gas Reactor concepts such as those of PBMR, Areva, and GA); and to identify the material models, design criteria, and analysis methods that need to be added to the ASME Code to cover the unresolved safety issues. Subsection NH was originally developed to provide structural design criteria and limits for elevated-temperature design of Liquid Metal Fast Breeder Reactor (LMFBR) systems and some gas-cooled systems. The U.S. Nuclear Regulatory Commission (NRC) and its Advisory Committee for Reactor Safeguards (ACRS) reviewed the design limits and procedures in the process of reviewing the Clinch River Breeder Reactor (CRBR) for a construction permit in the late 1970s and early 1980s, and identified issues that needed resolution. In the years since then, the NRC and various contractors have evaluated the applicability of the ASME Code and Code Cases to high-temperature reactor designs such as the VHTGRs, and identified issues that need to be resolved to provide a regulatory basis for licensing. This Report describes: (1) NRC and ACRS safety concerns raised during the licensing process of CRBR , (2) how some of these issues are addressed by the current Subsection NH of the ASME Code; and (3) the material models, design criteria, and analysis methods that need to be added to the ASME Code and Code Cases to cover unresolved regulatory issues for very high temperature service.

  18. DOE Issues Final Environmental Impact Statement for Disposal of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Greater-Than-Class C Waste | Department of Energy Environmental Impact Statement for Disposal of Greater-Than-Class C Waste DOE Issues Final Environmental Impact Statement for Disposal of Greater-Than-Class C Waste February 25, 2016 - 3:30pm Addthis WASHINGTON, D.C. - The U.S. Department of Energy (DOE) today issued a Final Environmental Impact Statement (EIS) that evaluates the potential environmental impacts associated with the proposed development, operation, and long-term management of

  19. and Operations | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    and Operations

  20. Occupational radiation Exposure at Agreement State-Licensed Materials Facilities, 1997-2010

    SciTech Connect (OSTI)

    U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research

    2012-07-07

    The purpose of this report is to examine occupational radiation exposures received under Agreement State licensees. As such, this report reflects the occupational radiation exposure data contained in the Radiation Exposure Information and Reporting System (REIRS) database, for 1997 through 2010, from Agreement State-licensed materials facilities.

  1. Technical guidance document for environmental requirements of commercial OTEC licensing regulations (15 CFR Part 981)

    SciTech Connect (OSTI)

    Not Available

    1981-09-01

    This document provides a potential OTEC applicant with the insights believed needed to satisfy the environmental information requirements of the regulations for licensing commercial OTEC facilities and plantships. This information should be used by applicants to define the site-specific details of the needed environmental assessment, and the details should then form a basis for pre-application consultations on the environmental requirements.

  2. Licensing Agreement Moves Two NETL-Patented Carbon Capture Sorbents Closer to Commercialization

    Office of Energy Efficiency and Renewable Energy (EERE)

    Two new patented sorbents used for carbon dioxide capture from coal-based power plants have moved closer to commercialization as a result of a licensing agreement between the Office of Fossil Energy's National Energy Technology Laboratory and ADA Environmental Solutions.

  3. NETL Technology for Safer, Cleaner Corrosion-Protecting Metal Coatings Licensed by Pittsburgh Start-Up

    Broader source: Energy.gov [DOE]

    The Energy Department’s National Energy Technology Laboratory (NETL) teamed up with Carnegie Mellon University to create a revolutionary, cost-effective technology to reduce the impact of corrosion, which costs the US economy an estimated $276 billion per year. This partnership resulted in the creation of a new spin-off company that signed a licensing agreement with NETL this past June.

  4. issue_no_9.pgm

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Winter 1997 Los Alamos National Laboratory o f t h e N u c l e a r M a t e r i a l s T e c h n o l o g y D i v i s i o n Quarterly In This Issue 1 Scientists Study the Use of Fullerenes to Trap Actinides 3 High-Level Policies Impact Stewardship of Excess Plutonium 5 On the Disposal of Plutonium 6 Fabrication of Zircon Leads to a Pu Stabilization Alternative 9 Ph.D. Thesis Explores Sodium Zirconium Phosphate (NZP) Waste Forms for Actinide Disposal 11 Recent Publications, Presentations, and

  5. Operating Experience Level 1, 2, and 3 Documents

    Broader source: Energy.gov [DOE]

    Operating Experience Level 1, 2, and 3 documents communicate required actions, information on safety issues or trends of concern, and lessons learned on operating experience to the DOE Complex to prevent adverse operating incidents and to expand the sharing of good work practices.

  6. EFRT M-12 Issue Resolution: Solids Washing

    SciTech Connect (OSTI)

    Baldwin, David L.; Schonewill, Philip P.; Toth, James J.; Huckaby, James L.; Eslinger, Paul W.; Hanson, Brady D.; Kurath, Dean E.; Minette, Michael J.

    2009-08-14

    Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.” The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. Two operating scenarios were evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-VSL-T01A/B ultrafiltration feed vessels, identified as Integrated Test A. The second scenario has caustic leaching conducted in the UFP-VSL-T02A ultrafiltration feed preparation vessel, identified as Integrated Test B. Washing operations in PEP Integrated Tests A and B were conducted successfully as per the approved run sheets. However, various minor instrumental problems occurred, and some of the process conditions specified in the run sheet were not met during the wash operations, such as filter-loop flow-rate targets not being met. Five analytes were selected based on full solubility and monitored in the post-caustic-leach wash as successful indicators of washing efficiency. These were aluminum, sulfate, nitrate, nitrite, and free hydroxide. Other analytes, including sodium, oxalate, phosphate, and total dissolved solids, showed indications of changing solubility; therefore, they were unsuitable for monitoring washing efficiency. In the post-oxidative-leach wash, two analytes with full solubility were selected as suitable indicators of washing

  7. Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues

    Broader source: Energy.gov [DOE]

    Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying...

  8. Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of

    Office of Environmental Management (EM)

    10 CFR 830 | Department of Energy 00-03: Specific Issues on Applicability of 10 CFR 830 Enforcement Guidance Supplement 00-03: Specific Issues on Applicability of 10 CFR 830 Section 1.3 of the Operational Procedure entitled Enforcement of DOE Nuclear Safety Requirements under Price-Anderson Amendments Act of 1988, published in June 1998, provides the opportunity for the Office of Enforcement and Investigation (EHEnforcement) to issue clarifying guidance in a timely manner with respect to the

  9. Enforcement Guidance Supplement 01-01: Nuclear Weapon Program Enforcement Issues

    Broader source: Energy.gov [DOE]

    Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. This enforcement guidance focuses on the applicability of 10 CFR Part 830 to nuclear weapon programs and several related enforcement issues.

  10. Issued by Sandia National Laboratories,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by Sandia National Laboratories, operated for the United States Department of Energy by Sandia Corporation. NOTICE: This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government, nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, make any warranty, express or implied, or assume any legal liability or responsibility for the accuracy, completeness, or

  11. Petroleum 1996 - issues and trends

    SciTech Connect (OSTI)

    1997-09-01

    Increasingly, users of the Energy Information Administration`s petroleum data and analytical reports have expressed an interest in a recurring report that takes a broad view of the petroleum sector. What is sought is some perspective on the complex interrelationships that comprise an industry and markets accounting for 40 percent of the energy consumed in the United States and ranging from the drilling rig in the oil field to the pump at the local gasoline station. This report comprehensively examines historical trends, and selectively focuses on major issues and the events they represent. It analyzes different dimensions of the industry and related markets in terms of how they relate to a common theme, in this case, the volatility in petroleum markets.

  12. Richland Operations Office - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Richland Operations Office Richland Operations Office Richland Operations Office River Corridor Central Plateau Groundwater Mission Support Newsroom Richland Operations Office...

  13. Document

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Issuing Nuclear Power Plant Operating License for an ... Tracts of Federal Coal Reserves, Belle Ayr, Coal Creek, ... Final EIS, NPS, SD, Wind Cave National Park ...

  14. EIS-0183: EPA Notice of Availability of the Final Environmental...

    Broader source: Energy.gov (indexed) [DOE]

    Beaver Valley Power Station, Units 1 and 2, Plant Specific, Issuing Nuclear Power Plant Operating License for an Additional 20- Year Period, Pennsylvania DOEEIS-0183,...

  15. Quarterly Nuclear Deployment Scorecard - October 2015 | Department...

    Office of Environmental Management (EM)

    October 2015 Quarterly Nuclear Deployment Scorecard - October 2015 News Updates The Nuclear Regulatory Commission has issued an operating license for Tennessee Valley Authority's ...

  16. Idaho National Laboratory Annual Site Environmental Report Issued

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    doe logo U.S. Department of Energy Idaho Operations Office Media Contact: Brad Bugger (208) 526-0833 September 20, 2011 Idaho National Laboratory Annual Site Environmental Report Issued The annual report that informs stakeholders about the Idaho National Laboratory�s environmental performance for the year 2010 is now available to the public. To access the report contact Gonzales-Stoller Surveillance at (208) 525-8250, to request a CD containing the report. The report includes data generated by

  17. Department of Energy Issues Draft Request for Proposals for Argonne

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Laboratory Contractor | Department of Energy Request for Proposals for Argonne National Laboratory Contractor Department of Energy Issues Draft Request for Proposals for Argonne National Laboratory Contractor January 3, 2006 - 9:06am Addthis WASHINGTON, DC -- The Department of Energy (DOE) is seeking comments on a draft Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor for Argonne National Laboratory (ANL), a major DOE

  18. Interagency mechanical operations group numerical systems group

    SciTech Connect (OSTI)

    1997-09-01

    This report consists of the minutes of the May 20-21, 1971 meeting of the Interagency Mechanical Operations Group (IMOG) Numerical Systems Group. This group looks at issues related to numerical control in the machining industry. Items discussed related to the use of CAD and CAM, EIA standards, data links, and numerical control.

  19. Issues in Midterm Analysis and Forecasting

    Reports and Publications (EIA)

    1999-01-01

    Final issue of this report. Presents a series of eight papers, which cover topics in analysis and modeling that underlie the Annual Energy Outlook 1999, as well as other significant issues in midterm energy markets.

  20. UAV sensor and survivability issues

    SciTech Connect (OSTI)

    Canavan, G.H.

    1996-07-01

    This report discusses the most significant tradeoffs between the operating altitude and the complexity and cost of UAVs and sensors. Low altitudes allow less complex, smaller sensors and platforms, but are vulnerable to ground fire. High altitudes require more numerous and capable sensors, but provide wider swaths for more rapid coverage and reduced vulnerability to ground fire. It is shown that for mission requirements and air defenses that higher is not necessarily better and that optimal flight altitudes exist that can be determined analytically.

  1. FEMP Federal Fleet Files - May 2009 Issue

    SciTech Connect (OSTI)

    2009-06-04

    May 2009 issue of the monthly FEMP newsletter highlighting the latest news and developments impacting Federal fleets.

  2. Labor Standards for DOE Management and Operating Contracts

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Flash is issued to provide you an Acquisition Letter containing information and guidance regarding application of labor standards at the Department of Energy (DOE) and National Nuclear Security Administration (NNSA) management and operating (M&O) contract facilities.

  3. BARRIER ISSUES TO THE UTILIZATION OF BIOMASS

    SciTech Connect (OSTI)

    Jay R. Gunderson; Bruce C. Folkedahl; Darren D. Schmidt; Greg F. Weber; Christopher J. Zygarlicke

    2002-05-01

    The Energy & Environmental Research Center (EERC) is conducting a project to examine the fundamental issues limiting the use of biomass in small industrial steam/power systems in order to increase the future use of this valuable domestic resource. Specifically, the EERC is attempting to elucidate the ash-related problems--grate clinkering and heat exchange surface fouling--associated with cofiring coal and biomass in grate-fired systems. Utilization of biomass in stoker boilers designed for coal can be a cause of concern for boiler operators. Boilers that were designed for low-volatile fuels with lower reactivities can experience damaging fouling when switched to higher-volatile and more reactive lower-rank fuels, such as when cofiring biomass. Higher heat release rates at the grate can cause more clinkering or slagging at the grate because of higher temperatures. Combustion and loss of volatile matter can start too early with biomass fuels compared to design fuel, vaporizing alkali and chlorides which then condense on rear walls and heat exchange tube banks in the convective pass of the boiler, causing noticeable increases in fouling. In addition, stoker-fired boilers that switch to biomass blends may encounter new chemical species such as potassium sulfates and various chlorides in combination with different flue gas temperatures because of changes in fuel heating value, which can adversely affect ash deposition behavior.

  4. PETC Review, Issue 6, Summer 1992

    SciTech Connect (OSTI)

    Santore, R.R.; Blaustein, B.D.; Reiss, J.; Brown, J.

    1992-10-01

    This issue of the PETC Review focuses on the Clean Coal Technology Demonstration Program. Several projects were completed recently and many more are beginning to generate data from operations, making this an ideal time to highlight this program. The program, which was initiated in 1986, now has 42 projects that represent a remarkable scope of activities ranging from the demonstration of improved retrofit components to the repowering of coal-fired electrical power plants with advanced systems. In 1986, when Congress committed the nation to this multi-billion dollar, multi-year demonstration program, the policy goals were clearly set forth and the funding was completely committed. I believe that defining and sticking to these goals and commitments has been critical to establishing substantial industry interest and investment, thereby enhancing the prospects for success. Both the public and private sectors were better able to establish priorities and to allocate resources to projects that best meet our nation`s energy and environmental needs. I believe that the Clean Coal Technology program will help fulfill the goals for coal that were recently reaffirmed in the National Energy Strategy: One Year Later-to maintain coal`s competitiveness and to create a favorable export market for US coal and coal technology.

  5. PETC Review, Issue 6, Summer 1992

    SciTech Connect (OSTI)

    Santore, R.R.; Blaustein, B.D.; Reiss, J.; Brown, J.

    1992-01-01

    This issue of the PETC Review focuses on the Clean Coal Technology Demonstration Program. Several projects were completed recently and many more are beginning to generate data from operations, making this an ideal time to highlight this program. The program, which was initiated in 1986, now has 42 projects that represent a remarkable scope of activities ranging from the demonstration of improved retrofit components to the repowering of coal-fired electrical power plants with advanced systems. In 1986, when Congress committed the nation to this multi-billion dollar, multi-year demonstration program, the policy goals were clearly set forth and the funding was completely committed. I believe that defining and sticking to these goals and commitments has been critical to establishing substantial industry interest and investment, thereby enhancing the prospects for success. Both the public and private sectors were better able to establish priorities and to allocate resources to projects that best meet our nation's energy and environmental needs. I believe that the Clean Coal Technology program will help fulfill the goals for coal that were recently reaffirmed in the National Energy Strategy: One Year Later-to maintain coal's competitiveness and to create a favorable export market for US coal and coal technology.

  6. Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility. Revision 3

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    The Standard Review Plan (SRP) (NUREG-1200) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform safety reviews of applications to construct and operate low-level radioactive waste disposal facilities. The SRP ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate proposed changes in the scope and requirements of the staff reviews. The SRP makes information about the regulatory licensing process widely available and serves to improve the understanding of the staff`s review process by interested members of the public and the industry. Each individual SRP addresses the responsibilities of persons performing the review, the matters that are reviewed, the Commission`s regulations and acceptance criteria necessary for the review, how the review is accomplished, the conclusions that are appropriate, and the implementation requirements.

  7. Assessment of Materials Issues for Light-Water Small Modular Reactors

    SciTech Connect (OSTI)

    Sandusky, David; Lunceford, Wayne; Bruemmer, Stephen M.; Catalan, Michael A.

    2013-02-01

    The primary objective of this report is to evaluate materials degradation issue unique to the operational environments of LWSMR. Concerns for specific primary system components and materials are identified based on the review of design information shared by mPower and NuScale. Direct comparisons are made to materials issues recognized for advanced large PWRs and research activities are recommended as needed. The issues identified are intended to improve the capability of industry to evaluate the significance of any degradation that might occur during long-term LWSMR operation and by extension affect the importance of future supporting R&D.

  8. Hot Leg Piping Materials Issues

    SciTech Connect (OSTI)

    V. Munne

    2006-07-19

    With Naval Reactors (NR) approval of the Naval Reactors Prime Contractor Team (NRPCT) recommendation to develop a gas cooled reactor directly coupled to a Brayton power conversion system as the space nuclear power plant (SNPP) for Project Prometheus (References a and b) the reactor outlet piping was recognized to require a design that utilizes internal insulation (Reference c). The initial pipe design suggested ceramic fiber blanket as the insulation material based on requirements associated with service temperature capability within the expected range, very low thermal conductivity, and low density. Nevertheless, it was not considered to be well suited for internal insulation use because its very high surface area and proclivity for holding adsorbed gases, especially water, would make outgassing a source of contaminant gases in the He-Xe working fluid. Additionally, ceramic fiber blanket insulating materials become very friable after relatively short service periods at working temperatures and small pieces of fiber could be dislodged and contaminate the system. Consequently, alternative insulation materials were sought that would have comparable thermal properties and density but superior structural integrity and greatly reduced outgassing. This letter provides technical information regarding insulation and materials issues for the Hot Leg Piping preconceptual design developed for the Project Prometheus space nuclear power plant (SNPP).

  9. Special Report on "Allegations of Conflict of Interest Regarding Licensing of PROTECT by Argonne National Laboratory"

    SciTech Connect (OSTI)

    2009-08-01

    In February 2009, the Office of Inspector General received a letter from Congressman Mark Steven Kirk of Illinois, which included constituent allegations that an exclusive technology licensing agreement by Argonne National Laboratory was tainted by inadequate competition, conflicts of interest, and other improprieties. The technology in question was for the Program for Response Options and Technology Enhancements for Chemical/Biological Terrorism, commonly referred to as PROTECT. Because of the importance of the Department of Energy's technology transfer program, especially as implementation of the American Recovery and Reinvestment Act matures, we reviewed selected aspects of the licensing process for PROTECT to determine whether the allegations had merit. In summary, under the facts developed during our review, it was understandable that interested parties concluded that there was a conflict of interest in this matter and that Argonne may have provided the successful licensee with an unfair advantage. In part, this was consistent with aspects of the complaint from Congressman Kirk's constituent.

  10. Licensing topical report: application of probabilistic risk assessment in the selection of design basis accidents. [HTGR

    SciTech Connect (OSTI)

    Houghton, W.J.

    1980-06-01

    A probabilistic risk assessment (PRA) approach is proposed to be used to scrutinize selection of accident sequences. A technique is described in this Licensing Topical Report to identify candidates for Design Basis Accidents (DBAs) utilizing the risk assessment results. As a part of this technique, it is proposed that events with frequencies below a specified limit would not be candidates. The use of the methodology described is supplementary to the traditional, deterministic approach and may result, in some cases, in the selection of multiple failure sequences as DBAs; it may also provide a basis for not considering some traditionally postulated events as being DBAs. A process is then described for selecting a list of DBAs based on the candidates from PRA as supplementary to knowledge and judgments from past licensing practice. These DBAs would be the events considered in Chapter 15 of Safety Analysis Reports of high-temperature gas-cooled reactors (HTGRs).

  11. Operating Experience Committee Charter

    Broader source: Energy.gov [DOE]

    The Operating Experience Committe Charter explains the purpose of the Department of Energy (DOE) Operating Experience Committee (OEC), which is to support line management within DOE and the DOE community in developing and sustaining effective oeprating experience programs so that lessons from inernal and external operating experience lead to improvement in future operational and safety performance.

  12. Operation Warfighter Internship Fair

    Broader source: Energy.gov [DOE]

    Attendees: Participants of Operation Warfighter Program Cost: Free Supports: Veteran and Disability Employment Programs

  13. Spent Nuclear Fuel Project path forward: nuclear safety equivalency to comparable NRC-licensed facilities

    SciTech Connect (OSTI)

    Garvin, L.J.

    1995-11-01

    This document includes the Technical requirements which meet the nuclear safety objectives of the NRC regulations for fuel treatment and storage facilities. These include requirements regarding radiation exposure limits, safety analysis, design and construction. This document also includes administrative requirements which meet the objectives of the major elements of the NRC licensing process. These include formally documented design and safety analysis, independent technical review, and oppportunity for public involvement.

  14. Project plan for resolution of the organic waste tank safety issues at the Hanford Site

    SciTech Connect (OSTI)

    Meacham, J.E.

    1996-10-03

    A multi-year project plan for the Organic Safety Project has been developed with the objective of resolving the organic safety issues associated with the High Level Waste (HLW) in Hanford`s single-shell tanks (SSTS) and double-shell tanks (DSTs). The objective of the Organic Safety Project is to ensure safe interim storage until retrieval for pretreatment and disposal operations begins, and to resolve the organic safety issues by September 2001. Since the initial identification of organics as a tank waste safety issue, progress has been made in understanding the specific aspects of organic waste combustibility, and in developing and implementing activities to resolve the organic safety issues.

  15. Issue #3: HVAC Proper Installation Energy Savings: Over-Promising or

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Under-Delivering? | Department of Energy 3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering? Issue #3: HVAC Proper Installation Energy Savings: Over-Promising or Under-Delivering? What energy savings are realistically achievable by following quality installation standards for installation, operation, and maintenance of residential HVAC? issue3_airflow_charge.pdf (804.56 KB) issue3_hvac_installed.pdf (89.79 KB) issue3_pdi_hvacsys.pdf (325.73 KB) More Documents

  16. EXA-13-0001 - In the Matter of Washington State Fleet Operations...

    Broader source: Energy.gov (indexed) [DOE]

    State Fleet Operations (Washington) Appeal of a determination issued on September ... requirements under the AFTP. Washington's appeal was based upon its claims that: (1) it ...

  17. Inspection report: the Department of Energy's export licensing process for dual-use and munitions commodities

    SciTech Connect (OSTI)

    Friedman, Gregory H.

    1999-05-01

    Export of commodities, encouraged by both the private sector and the Federal Government, helps to improve our position in the global economy and is in the national interest of the US. However, exports of commodities or technologies, without regard to whether they may significantly contribute to the military potential of individual countries or combination of countries or enhance the proliferation of weapons of mass destruction, may adversely affect the national security of the US. The Federal Government, therefore, implements several laws, Executive Orders, and regulations to control the export of certain commodities and technologies. These commodities and technologies require a license for export. Some of the controlled items are designated as ''dual-use,'' that is, commodities and technologies that have both civilian and military application. Some dual-use commodities are designated as ''nuclear dual-use''--items controlled for nuclear nonproliferation purposes. Another group of controlled commodities is designated as munitions, which are goods and technologies that have solely military uses. The Department of Energy (Energy) conducts reviews of export license applications for nuclear dual-use items and certain munitions. On August 26, 1998, the Chairman of the Senate Committee on Governmental Affairs requested that the Inspectors General from the Departments of Commerce, Defense, Energy, State, and Treasury, and the Central Intelligence Agency (CIA), update and expand on a 1993 interagency review conducted by the Inspectors General of the Departments of Commerce, Defense, Energy, and State of the export licensing processes for dual-use and munitions commodities.

  18. EDITORIAL HPJ SPECIAL ISSUE INTRODUCTION

    SciTech Connect (OSTI)

    Farfan, E.

    2011-10-01

    international scientific community to support ICC and join its activities (Chernobyl Center 2006). In December 1995, a memorandum of understanding (MOU) on the ChNPP closure was signed by the government of Ukraine, all of the G7 governments, and the European Commission. The ICC foundation was considered critical to ensure the safe decommissioning of the ChNPP reactor units and improvement of the safety of the Chernobyl Containment Shelter. On the 10th anniversary of the Chernobyl accident (26 April 1996), Mr. Viktor Yushchenko, the President of Ukraine, issued a decree to establish the Chernobyl Center for Nuclear Safety, Radioactive Waste and Radioecology (Chernobyl Center). On the same day, a MOU involving the US participation in Chernobyl Center activities was signed by the US and Ukraine (Chernobyl Center 2006). In July 1998, the US and Ukraine signed an agreement to establish the International Radioecology Laboratory (IRL) as part of the Chernobyl Center. The creation of IRL was a logical continuation of previous programs to conduct scientific research in radioecology and provide Ukraine and the rest of the world with the necessary infrastructure and scientific basis to conduct research in radioecology, radiobiology, dosimetry, and environmental protection in the ChEZ (Chernobyl Center 2006). A recent collaborative effort with IRL has been implemented through a project titled 'Long-term impacts from radiation/contamination within the Chernobyl Exclusion Zone' (Farfan et al. 2008; Gerdes et al. 2009; Marra et al. 2010). This collaboration had the following objectives: (1) Assess the long-term impacts to the environment from radiation exposure within the ChEZ; (2) Provide information on remediation guidelines and ecological risk assessment within radioactively contaminated territories based on the results of long-term field monitoring, analytical measurements, and numerical modeling of soils and groundwater radioactive contamination; and (3) Recommend the development and

  19. US nuclear power plant operating cost and experience summaries

    SciTech Connect (OSTI)

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

  20. DOE Issues Request for Quotations for Depleted Uranium Hexafluoride Conversion Technical Services

    Broader source: Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Request for Quotation (RFQ) for engineering and operations technical services to support the Portsmouth Paducah Project Office and the oversight of operations of the Depleted Uranium Hexafluoride (DUF6) Conversion Project located in Paducah KY, and Portsmouth OH.

  1. Application Of The Iberdrola Licensing Methodology To The Cofrentes BWR-6 110% Extended Power Up-rate

    SciTech Connect (OSTI)

    Mata, Pedro; Fuente, Rafael de la; Iglesias, Javier; Sedano, Pablo G.

    2002-07-01

    Iberdrola (spanish utility) and Iberdrola Ingenieria (engineering branch) have been developing during the last two years the 110% Extended Power Up-rate Project (EPU 110%) for Cofrentes BWR-6. IBERDROLA has available an in-house design and licensing reload methodology that has been approved by the Spanish Nuclear Regulatory Authority. This methodology has been already used to perform the nuclear design and the reload licensing analysis for Cofrentes cycles 12 to 14. The methodology has been also applied to develop a significant number of safety analysis of the Cofrentes Extended Power Up-rate including: Reactor Heat Balance, Core and Fuel performance, Thermal Hydraulic Stability, ECCS LOCA Evaluation, Transient Analysis, Anticipated Transient Without Scram (ATWS) and Station Blackout (SBO) Since the scope of the licensing process of the Cofrentes Extended Power Up-rate exceeds the range of analysis included in the Cofrentes generic reload licensing process, it has been required to extend the applicability of the Cofrentes licensing methodology to the analysis of new transients. This is the case of the TLFW transient. The content of this paper shows the benefits of having an in-house design and licensing methodology, and describes the process to extend the applicability of the methodology to the analysis of new transients. The case of analysis of Total Loss of Feedwater with the Cofrentes Retran Model is included as an example of this process. (authors)

  2. PARC Periodical | Vol. 6, Issue 2 | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vol. 6, Issue 2 December 1, 2014 PARC Periodical | Vol. 6, Issue 2 View Periodical Here

  3. PARC Periodical | Vol. 6, Issue 3 | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vol. 6, Issue 3 February 9, 2015 PARC Periodical | Vol. 6, Issue 3 View Periodical Here

  4. PARC Periodical | Volume 6, Issue 6 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center 6, Issue 6 August 20, 2015 PARC Periodical | Volume 6, Issue 6

  5. PARC Periodical | Volume 7, Issue 1 | Photosynthetic Antenna Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Center 7, Issue 1 October 12, 2015 PARC Periodical | Volume 7, Issue 1

  6. Generic Issue 87: Flexible wedge gate valve test program

    SciTech Connect (OSTI)

    Steele, R. Jr.; DeWall, K.G.; Watkins, J.C. )

    1991-01-01

    Qualification and flow isolation tests were conducted to analyze the ability of selected boiling water reactor process valves to perform their containment isolation functions at high energy pipe break conditions and other more normal flow conditions. Numerous parameters were measured to assess valve and motor-operator performance at various valve loadings and to assess industry practices for predicting valve and motor operator requirements. The valves tested were representative of those used in reactor water cleanup systems in boiling water reactors and those used in boiling water reactor high-pressure coolant injection (HPCI) steam lines. These tests will provide further information for the US Nuclear Regulatory Commission Generic Issue-87, Failure of the HPCI Steam Line Without Isolation,'' and Generic Letter 89--10, Safety-related Motor Operated Valve Testing and Surveillance.'' 6 refs., 54 figs., 4 tabs.

  7. LANL continuity of operations plan

    SciTech Connect (OSTI)

    Senutovitch, Diane M

    2010-12-22

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an

  8. Overview of mixed waste issues

    SciTech Connect (OSTI)

    Piciulo, P.L.; Bowerman, B.S.; Kempf, C.R.; MacKenzie, D.R.; Siskind, B.

    1986-01-01

    Based on BNL's study it was concluded that there are LLWs which contain chemically hazardous components. Scintillation liquids may be considered an EPA listed hazardous waste and are, therefore, potential mixed wastes. Since November, 1985 no operating LLW disposal site will accept these wastes for disposal. Unless such wastes contain de minimis quantities of radionuclides, they cannot be disposed of at an EPA an EPA permitted site. Currently generators of LSC wastes can ship de minimis wastes to be burned at commercial facilities. Oil wastes will also eventually be an EPA listed waste and thus will have to be considered a potential radioactive mixed wasted unless NRC establishes de minimis levels of radionuclides below which oils can be managed as hazardous wastes. Regarding wastes containing lead metal there is some question as to the extent of the hazard posed by lead disposed in a LLW burial trench. Chromium-containing wastes would have to be tested to determine whether they are potential mixed wastes. There may be other wastes that are mixed wastes; the responsibility for determining this rests with the waste generator. It is believed that there are management options for handling potential mixed wastes but there is no regulatory guidance. BNL has identified and evaluated a variety of treatment options for the management of potential radioactive mixed wastes. The findings of that study showed that application of a management option with the purpose of addressing EPA concern can, at the same time, address stabilization and volume reduction concerns of NRC.

  9. Recent NRC research activities addressing valve and pump issues

    SciTech Connect (OSTI)

    Morrison, D.L.

    1996-12-01

    The mission of the U.S. Nuclear Regulatory Commission (NRC) is to ensure the safe design, construction, and operation of commercial nuclear power plants and other facilities in the U.S.A. One of the main roles that the Office of Nuclear Regulatory Research (RES) plays in achieving the NRC mission is to plan, recommend, and implement research programs that address safety and technical issues deemed important by the NRC. The results of the research activities provide the bases for developing NRC positions or decisions on these issues. Also, RES performs confirmatory research for developing the basis to evaluate industry responses and positions on various regulatory requirements. This presentation summarizes some recent RES supported research activities that have addressed safety and technical issues related to valves and pumps. These activities include the efforts on determining valve and motor-operator responses under dynamic loads and pressure locking events, evaluation of monitoring equipment, and methods for detecting and trending aging of check valves and pumps. The role that RES is expected to play in future years to fulfill the NRC mission is also discussed.

  10. Smart Grid - Transforming Power System Operations

    SciTech Connect (OSTI)

    Widergren, Steven E.; Kirkham, Harold

    2010-04-28

    AbstractElectric power systems are entering a new realm of operations. Large amounts of variable generation tax our ability to reliably operate the system. Couple this with a greater reliance on the electricity network to serve consumer demand that is likely to rise significantly even as we drive for greater efficiency. Trade-offs between energy and environmental needs will be constantly negotiated, while a reliable supply of electricity needs even greater assurance in a world where threats of disruption have risen. Smart grid capabilities are being proposed to help address the challenges confronting system operations. This paper reviews the impact of smart grid functionality on transforming power system operations. It explores models for distributed energy resources (DER generation, storage, and load) that are appearing on the system. It reviews the evolving nature of electricity markets to deal with this complexity and a change of emphasis on signals from these markets to affect power system control. Smart grid capabilities will also impact reliable operations, while cyber security issues must be addressed as a culture change that influences all system design, implementation, and maintenance. Lastly, the paper explores significant questions for further research and the need for a simulation environment that supports such investigation and informs deployments to mitigate operational issues as they arise.

  11. DOE SSL Postings: November 10, 2015, issue

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    West Parking Garage combined 252 metal halide (MH) luminaires that operated after dark with fluorescent luminaires that operated during daylight hours. In early 2013, the...

  12. The geologist and public policy issues, opportunities and obligations

    SciTech Connect (OSTI)

    Schmidt, W. )

    1993-03-01

    Historically, geologists have been perceived by the public as solely involved in resource exploration and production or geologic hazards mitigation. This generally included mining, oil drilling, landslide or earthquake (after the fact) comments, and rock or mineral collecting. These operations have come to be associated with land exploitation involving extraction of non-renewable resources, and often, in consequence, pollution. These generic activities may not currently be considered environmentally sound or politically correct. Because of the high visibility of environmental issues in recent years, geologists now have an opportunity to offer necessary input contributing to solutions for many of these problems. Indeed, geologists must be thought of as part of the solution, and thus alter public perception that geologists are facilitators of environmental damage. After all, who may better protect and conserve the earth and its environments than people trained in the Earth Sciences Governmental and industry or consulting geologists are now involved in a wide range of interpretative geologic decisions regarding a cross-section of activities aimed at development and conservation of lands and natural resources. These can be grouped in generalized categories including: waste disposal issues, water resources issues, land-use planning and zoning issues, and resource conservation or regulation requirements.

  13. Inquiry 2012, Issue 1 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, Issue 1 Image Welcome to Inquiry 2012, Issue 1 Materials and Manufacturing This issue of Inquiry focuses on the vital link between materials and manufacturing. The Ames Laboratory is among the research centers that are the most consistently successful in the world at bringing advanced basic science together with manufacturing applications in the realm of materials. This kind of success in technology transfer requires many skills and capabilities, but the first of these is world-leading

  14. Inquiry 2014, Issue 1 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, Issue 1 Welcome to Inquiry 2014, Issue 1 Behind the Science at The Ames Laboratory Image For every discovery, big or small, there are countless hours spent in the lab developing experiments, analyzing data and then trying to replicate the results. It takes experimentalists, characterization experts, and theorists all working together. Research at the Ames Laboratory exemplifies just this type of teamwork, as you'll see in the stories presented in this issue. While projects must have

  15. Key Issues in Tribal Energy Development

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Key Issues in Tribal Energy Development Common Issues, Causes and Solutions Douglas C. MacCourt, Ater Wynne LLP Chair Chair, Executive Committee Indian Law Practice Group Indian Law Section Ater Wynne LLP Oregon State Bar Association dcm@aterwynne.com www.aterwynne.com US DOE Tribal Energy Program/NREL Denver, Colorado October 25-28, 2010 Overview of Presentation * Overview of Handbook * A note on Alaska * Common development issues and solutions 1. Finding Early Stage Risk Capital * Necessary

  16. Abandoning pipelines working group regulatory issues

    SciTech Connect (OSTI)

    1997-03-01

    The history of hydrocarbon development in Louisiana and off its coast is one of the interdependence of technological innovation, entrepreneurial risk-taking, resource management, judicial decisions, legislation, marketing, employee good will, infrastructure and support services, coupled with favorable geologic structures that made early exploration and development relatively easy. Mariners sailing off the coast of Louisiana and Texas in the 1600`s recorded one of the earliest known natural oil seeps. They shrugged it off as unimportant, as there was no market for the substance they witnessed. The seepage, however, provided a tiny clue to the vast storehouse of hydrocarbons trapped in the earth`s crust extending from the uplands, through Louisiana`s swamps and marshes, and into the subaqueous habitats of the Gulf of Mexico-the world`s ninth largest body of water. In all cases, each move into a new geographic province required considerable change in operation philosophy and in the science supporting the exploration and development activity. As technology changed, or was developed to meet the industry`s needs, new frontiers were explored. However, with time-as is the case with any nonrenewable resource-fields and wells lost their productive life. They had to be abandoned. In fact, the Minerals Management Service suggests that within the next 10 years the offshore industry will remove 150 platforms per year, or nearly half of the current number of production units. The industry will be asked to dispose of nearly one unit every 2.4 days. If this is the case, abandonment issues are going to continue to surface.

  17. Climate Data Operators (CDO)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Climate Data Operators (CDO) Climate Data Operators (CDO) Description and Overview CDO is a large tool set for working on climate data. NetCDF 34, GRIB including SZIP compression, ...

  18. LLW Processing and Operational Experience using a Plasma ARC Centrifugal Treatment (PACT{sup TM}) System

    SciTech Connect (OSTI)

    Shuey, M.W.; Ottmer, P.P.

    2006-07-01

    After several years of development, a commercially available high-temperature treatment system has been developed, licensed, and installed that treats heterogeneous low-level radioactive waste. High temperature plasma processing, unique torch design and operating features make it feasible to achieve a volume reduced, permanent, high integrity waste form while eliminating the personnel exposure and costs associated with conventional sorting, characterizing and handling. The Plasma Arc Centrifugal Treatment system or PACT{sup TM} manufactured by Retech Systems LLC is a licensed thermal plasma system that processes and consolidates low level radioactive wastes. The first PACT{sup TM} thermal plasma system to be licensed was at ZWILAG (Zwischenlager Wuerenlingen AG, Switzerland) in May 2004, and the second is utilized by the Japan Atomic Power Company (JAPC) in Tsuruga, Japan in March 2005. ZWILAG uses a drum feeder that processes the 200-liter drums from storage horizontally and pours the molten slag into molds. The drums contain organic and inorganic wastes (mixed waste), and by processing the drums directly lowers exposure to processing personnel. ZWILAG production data mid-2004 through mid-June 2005 has fed 9.4 E+10 Bq of mixed waste and stabilized 8.5 E+10 Bq in slag with a mean activity of 2.1 E+09 Bq/drum. The operational experience demonstrated by ZWILAG and JAPC has been a testament to the success of thermal plasma and their unique status has proven the real benefits of using the PACT{sup TM} system. (authors)

  19. Relicensing and Environmental Issues Affecting Hydropower

    Reports and Publications (EIA)

    1998-01-01

    This article presents an overview of the hydropower industry and summarizes two recent events that have greatly influenced relicensing and environmental issues.

  20. Department of Energy Issues Funding Opportunity Announcements...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    website. Media contact(s): (202) 586-4940 Addthis Related Articles Department of Energy Issues Funding Opportunity Announcements to Enhance Nuclear Energy Education Department ...

  1. UESC Contracting Officer Issues Round-Up

    Broader source: Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses issues contracting officers often face with utility energy service contracts (UESCs).

  2. Inquiry 2010, Issue 2 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0, Issue 2 Welcome to Inquiry 2010, Issue 2 "The Rare Earth Issue" This issue of Inquiry highlights rare-earth elements which play a vital role in just about every new technology from consumer electronics and cell phones to hybrid car batteries and generator motors in wind turbines. We discuss the Ames Laboratory's role as an international leader in rare-earth research and look at the current crisis caused by China's monopoly as the source of rare-earth oxides, on-going research

  3. Inquiry 2012, Issue 2 | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, Issue 2 Welcome to Inquiry 2012, Issue 2 Faces of the Ames Laboratory Image This issue of Inquiry focuses on some of the many faces that make up the Ames Laboratory. In fact, it is the people -- the researchers, support staff and students -- who make the Laboratory what it is. In this issue, we introduce nine of our researchers. You get to learn about their research but also find out a little about them personally. What motivates them, how they view their work and the Ames Laboratory. We also

  4. Reactor Materials Newsletter, Issue 2, May 2016

    Broader source: Energy.gov [DOE]

    Reactor Materials Newsletter - Issue 2 The Reactor Materials (RM) newsletter includes information about key nuclear materials programs and results from ongoing projects across the Office of Nuclear Energy.

  5. Technical Assessment Team Issues Final Report

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 2015 Technical Assessment Team Issues Final Report This week the Department of Energy's Technical Assessment Team (TAT) visited Carlsbad and met with federal and contractor staff ...

  6. Emerging critical issues and technology needs

    SciTech Connect (OSTI)

    Arvizu, D.E.; Baker, A.B.

    1997-08-01

    In April 1997, a panel of experts representing private sector electricity companies met to identify emerging critical issues in the electricity sector and to ascertain how technology can help with these issues. Sandia National laboratories sponsored and conducted the meeting. The panel determined the top eight issues that will be critically important over the next five to ten years, when the electricity sector is expected to undergo a major transition in its market and the regulations that govern it. This report presents a discussion of the selection and ranking of critical issues identified by the panel and the research priorities that were identified.

  7. Department of Energy Issues Funding Opportunity Announcement...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Science and Engineering Fellowships and Scholarships Department of Energy Issues Funding Opportunity Announcement to U.S. Universities for Nuclear Science and Engineering ...

  8. Failure analysis issues in microelectromechanical systems (MEMS...

    Office of Scientific and Technical Information (OSTI)

    Title: Failure analysis issues in microelectromechanical systems (MEMS). Failure analysis and device characterization of MEMS components are critical steps in understanding the ...

  9. Energy Department Issues Green Building Certification System...

    Energy Savers [EERE]

    Green Building Certification System Final Rule to Support Increased Energy Measurement and Efficient Building Design Energy Department Issues Green Building Certification System ...

  10. Calutron Operators | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operators Calutron Operators Young women recruited to operate the calutrons

  11. Paducah Operations Timeline | Department of Energy

    Energy Savers [EERE]

    Operations Timeline Paducah Operations Timeline Paducah Operations Timeline

  12. ARM - NSA Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AlaskaNSA Operations NSA Related Links Virtual Tour Facilities and Instruments Barrow Atqasuk Oliktok Point (AMF3) ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site NSA Fact Sheet Images Information for Guest Scientists Contacts NSA Operations Barrow Facility Instrumentation at the Barrow facility operates 7 days a week, 24 hours a day, year around. The instrumentation is routinely maintained using an extensive "daily rounds" checklist 5 days a week,

  13. SWPF Crane Lift Operation

    SciTech Connect (OSTI)

    2010-01-01

    A multiple vview shot of the SWPF crane lift operation at the Savannah River Site. Funded by the Recovery Act.

  14. Identification and Evaluation of Human Factors Issues Associated with Emerging Nuclear Plant Technology

    SciTech Connect (OSTI)

    O'Hara,J.M.; Higgins,J.; Brown, William S.

    2009-04-01

    This study has identified human performance research issues associated with the implementation of new technology in nuclear power plants (NPPs). To identify the research issues, current industry developments and trends were evaluated in the areas of reactor technology, instrumentation and control technology, human-system integration technology, and human factors engineering (HFE) methods and tools. The issues were prioritized into four categories based on evaluations provided by 14 independent subject matter experts representing vendors, utilities, research organizations and regulators. Twenty issues were categorized into the top priority category. The study also identifies the priority of each issue and the rationale for those in the top priority category. The top priority issues were then organized into research program areas of: New Concepts of Operation using Multi-agent Teams, Human-system Interface Design, Complexity Issues in Advanced Systems, Operating Experience of New and Modernized Plants, and HFE Methods and Tools. The results can serve as input to the development of a long-term strategy and plan for addressing human performance in these areas to support the safe operation of new NPPs.

  15. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    unique in that it was issued by RL in 1996, and has been maintained and interpreted by a Focus Group with invited membership by technical experts from the Office of River...

  16. Application of the New Decommissioning Regulation to the Nuclear Licensed Facilities (NLF) at Fontenay-aux-Roses's Nuclear Center (CEA)

    SciTech Connect (OSTI)

    Sauret, Josiane; Piketty, Laurence; Jeanjacques, Michel

    2008-01-15

    This abstract describes the application of the new decommissioning regulation on all Nuclear Licensed Facilities (NLF is to say INB in French) at Fontenay-aux-Roses's Center (CEA/FAR). The decommissioning process has been applied in six buildings which are out of the new nuclear perimeter proposed (buildings no 7, no 40, no 94, no 39, no 52/1 and no 32) and three buildings have been reorganized (no 54, no 91 and no 53 instead of no 40 and no 94) in order to increase the space for temporary nuclear waste disposal and to reduce the internal transports of nuclear waste on the site. The advantages are the safety and radioprotection improvements and a lower operating cost. A global safety file was written in 2002 and 2003 and was sent to the French Nuclear Authority on November 2003. The list of documents required is given in the paragraph I of this paper. The main goals were two ministerial decrees (one decree for each NLF) getting the authorization to modify the NLF perimeter and to carry out cleaning and dismantling activities leading to the whole decommissioning of all NLF. Some specific authorizations were necessary to carry out the dismantling program during the decommissioning procedure. They were delivered by the French Nuclear Safety Authority (FNSA) or with limited delegation by the General Executive Director (GED) on the CEA Fontenay-aux-Roses's Center, called internal authorization. Some partial dismantling or decontamination examples are given below: - evaporator for the radioactive liquid waste treatment station (building no 53): FNSA authorization: phase realised in 2002/2003. - disposal tanks for the radioactive liquid waste treatment station (building no 53) FNSA authorization: phase realised in 2004, - incinerator for the radioactive solid waste treatment station (building no 07): FNSA authorization: operation realised in 2004, - research equipments in the building no. 54 and building no. 91: internal authorization ; realised in 2005, - sample

  17. Safety Issues with Hydrogen as a Vehicle Fuel

    SciTech Connect (OSTI)

    Cadwallader, Lee Charles; Herring, James Stephen

    1999-10-01

    This report is an initial effort to identify and evaluate safety issues associated with the use of hydrogen as a vehicle fuel in automobiles. Several forms of hydrogen have been considered: gas, liquid, slush, and hydrides. The safety issues have been discussed, beginning with properties of hydrogen and the phenomenology of hydrogen combustion. Safety-related operating experiences with hydrogen vehicles have been summarized to identify concerns that must be addressed in future design activities and to support probabilistic risk assessment. Also, applicable codes, standards, and regulations pertaining to hydrogen usage and refueling have been identified and are briefly discussed. This report serves as a safety foundation for any future hydrogen safety work, such as a safety analysis or a probabilistic risk assessment.

  18. Safety Issues with Hydrogen as a Vehicle Fuel

    SciTech Connect (OSTI)

    L. C. Cadwallader; J. S. Herring

    1999-09-01

    This report is an initial effort to identify and evaluate safety issues associated with the use of hydrogen as a vehicle fuel in automobiles. Several forms of hydrogen have been considered: gas, liquid, slush, and hydrides. The safety issues have been discussed, beginning with properties of hydrogen and the phenomenology of hydrogen combustion. Safety-related operating experiences with hydrogen vehicles have been summarized to identify concerns that must be addressed in future design activities and to support probabilistic risk assessment. Also, applicable codes, standards, and regulations pertaining to hydrogen usage and refueling have been identified and are briefly discussed. This report serves as a safety foundation for any future hydrogen safety work, such as a safety analysis or a probabilistic risk assessment.

  19. Product and Service Directory 2004 Issue

    SciTech Connect (OSTI)

    Agnihotri, N.K.

    2003-12-01

    This annual November-December issue of the Nuclear Plant Journal serves as directory of information resources on products and services related to the nuclear power industry. The directory consists of over 3,000 products and services submitted by over 300 suppliers worldwide during October and November 2003. The issue is divided into 4 main areas: Products and Services, Corporate Capabilities, and Suppliers.

  20. Preparation for Early Termination of Ignalina NPP Operation

    SciTech Connect (OSTI)

    Poskas, P.; Poskas, R.

    2003-02-26

    Seimas (Parliament of Lithuania) approved updated National Energy strategy where it is indicated that first Unit will be shutdown before the year 2005 and second Unit in 2009 if funding for decommissioning is available from EU and other donors. In accordance to Ignalina NPP Unit 1 Closure Law the Government of Lithuania approved the Ignalina NPP Unit 1 Decommissioning Program until year 2005. For enforcement of this program, the plan of measures for implementation of the program was prepared and approved by the Minister of Economy. The plan consists of two parts, namely technical- environmental and social-economic. Technical-environmental measures are mostly oriented to the safe management of spent nuclear fuel and operational radioactive waste stored at the plant and preparation of licensing documents for Unit 1 decommissioning. Social-economic measures are oriented to mitigate negative social and economic impact on Lithuania, inhabitants of the region, and, particularly, o n the staff of Ignalina NPP by means of creating favorable conditions for a balanced social and economic development of the region. In this paper analysis of planned activities, licensing requirements for decommissioning, progress in preparation of the Final Decommissioning Plan is discussed.