Powered by Deep Web Technologies
Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Coaxial 30 kV Connectors for the RG220/U Cable 20 Years of Operational Experience  

E-Print Network (OSTI)

For the fast pulsed magnet system of CERN's SPS and LEP particle accelerators, a special type of moulded coaxial high voltage cable connector is used in large quantities. These connectors are mounted on coaxial transmission lines, which connect pulse generators in buildings at ground level to the fast pulsed magnets situated in an underground tunnel. Well over 1500 such connectors have already been installed and many more will be needed for the construction of the LHC. This 14 TeV Large Hadron Collider, which has a circumference of 27 km, is now under construction at CERN. The paper summarizes the operational experience over the last 20 years and the design principles of the connector. It explains how the excellent reliability and the extremely low failure rate were achieved and outlines the causes of the rare replacements. The paper also discusses the ageing effects caused by radiation, as well as wear and tear during installation and manipulation. Finally it gives a report on our experience with coaxial con...

Mayer, M

2000-01-01T23:59:59.000Z

2

Operation of a long-term transient monitoring system in a 138-KV and a 500-KV substation  

SciTech Connect

This paper describes the operating performance of automatic transient monitoring laboratories designed to capture fault and transient data on power systems. Laboratories were installed in a 138-kV and a 500-kV substation and operated for more than 25,000 hours over a three-year period. Recorded during this period were 341 events consisting of lightning, switching, and fault transients. These results provide invaluable data on actual transients in power systems to aid power system equipment designers.

Perkins, M.D.; Mauser, S.F.; Mikell, D.C.; Nilsson, S.L.

1984-08-01T23:59:59.000Z

3

230 kV operation of a substation designed for 115 kV by controlling voltage transients  

SciTech Connect

Arresters applied at the terminals of gas insulated substations have been used successfully for protection from switching and lightning surges. This arrester application for gas insulated substations permits the use of lower insulation levels and therefore more economical substations. In principle, the same technique can be applied to air insulated substations. This paper describes the analysis of transient voltages in a substation designed for 115 kV which is scheduled for operation at 230 kV. Both arrester rating and location are considered in this analysis. It is shown that complete substation protection is possible by addition of both arresters and capacitors.

Lannes, W.J.; Cheramie, W.J.; Priest, K.W.; Wilhelm, M.R.

1984-09-01T23:59:59.000Z

4

Hydro Quebec's 735 kV system in operation by 1965  

SciTech Connect

The 735-kV transmission system adopted for the Manicouagan-Outardes development consists of three 735-kV lines, two of which will cross the St. Lawrence River at Quebec City and follow its south shore to Montreal. The third circuit will be entirely on the north shore of the St. Lawrence. Six 735-kV substations will be required: two collector substations at the sending end, two intermediate substations in the Quebec City area and two receiving substations in the Montreal area. Some of the problems associated with the planning and design of a transmission system intended to deliver approximately 5000 MW over a distance of 360 miles are discussed. The aspects of transmission and substation planning, transmission line features, substation design, control and communications design are considered.

Cardella, O.; D' Auteuil, L.; Fournier, R.P.; McGillis, D.T.; Monty, G.

1963-01-01T23:59:59.000Z

5

OPERATIONAL RESULTS OF THE SPALLATION NEUTRON SOURCE (SNS) POLYPHASE CONVERTER-MODULATOR FOR THE 140 KV KLYSTRON RF SYSTEMS  

SciTech Connect

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltage-switching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three ''H-Bridge'' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

W.A. REASS; J.D. DOSS; ET AL

2001-06-01T23:59:59.000Z

6

Operational results of the spallation neutron source (SNS) polyphase converter-modulator for the 140 KV klystron RF system  

SciTech Connect

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltageswitching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three 'H-Bridge' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

Reass, W. A. (William A.); Doss, James D.; Gribble, R. F. (Robert F.); Lynch, M. T. (Michael T.); Rees, D. E. (Daniel E.); Tallerico, P. J. (Paul J.); Borovina, D. L.

2001-01-01T23:59:59.000Z

7

Operational results of the spallation neutron source (SNS) polyphase converter-modulator for the 140 KV klystron RF system  

DOE Green Energy (OSTI)

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltageswitching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three 'H-Bridge' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

Reass, W. A. (William A.); Doss, James D.; Gribble, R. F. (Robert F.); Lynch, M. T. (Michael T.); Rees, D. E. (Daniel E.); Tallerico, P. J. (Paul J.); Borovina, D. L.

2001-01-01T23:59:59.000Z

8

OPERATIONAL RESULTS OF THE SPALLATION NEUTRON SOURCE (SNS) POLYPHASE CONVERTER-MODULATOR FOR THE 140 KV KLYSTRON RF SYSTEMS  

SciTech Connect

This paper describes the first operational results of the 140 kV, 1 MW average, 11 MW peak, zero-voltage-switching, 20 kHz polyphase bridge, boost converter-modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2100 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three ''H-Bridge'' Insulated Gate Bipolar Transistor (IGBT) switching networks are used to generate the polyphase 20 kHz transformer primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. Pulse-Width Modulation (PWM) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to boost output voltage and resonate transformer leakage inductance. With the appropriate transformer leakage inductance and peaking capacitance, zero-voltage-switching of the IGBT's is attained, minimizing switching losses. Reviews of these design parameters and an examination of the first operational results will be performed.

W.A. REASS; J.D. DOSS; ET AL

2001-06-01T23:59:59.000Z

9

A New Operational Tests Circuit for Testing ±660kV UHVDC Thyristor Valves  

Science Conference Proceedings (OSTI)

Operational test is an important measure which can guarantee safe and stable operation of UHVDC thyristor valves. HVDC thyristor modules can be performed either in a six-pulse back-to-back test circuit or in a synthetic test circuit. UHVDC thyristor ... Keywords: HVDC thyristor valve, operational tests, synthetic test circuit

Ting Xie; Tang Guang-fu; Zha Kun-peng; Gao Chong

2010-06-01T23:59:59.000Z

10

Evaluation of 765-kV Polymer Insulators in a Contaminated Environment  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) and the Korea Electric Power Research Institute (KEPRI) are conducting a joint study on the aging performance of 765-kV polymer insulators in a contaminated marine environment. The main component of this research is a long-term (two-year) natural aging test that will be conducted by KEPRI at their 765-kV Gochang test facility in South Korea. EPRI has engaged three other utilities that operate 765-kV transmission systemsEskom in South Africa, American Electric ...

2010-04-30T23:59:59.000Z

11

Two Years of Operational Hurricane Synoptic Surveillance  

Science Conference Proceedings (OSTI)

In 1997, the National Hurricane Center and the Hurricane Research Division began operational synoptic surveillance missions with the Gulfstream IV-SP jet aircraft to improve the numerical guidance for hurricanes that threaten the continental ...

Sim D. Aberson

2002-10-01T23:59:59.000Z

12

FTCP Operational Plan and Closeout Summary, Fiscal Year 2012 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Plan and Closeout Summary, Fiscal Year 2012 Operational Plan and Closeout Summary, Fiscal Year 2012 FTCP Operational Plan and Closeout Summary, Fiscal Year 2012 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2012 Operational Plan FY2012 Operational Plan Closeout Summary More Documents & Publications FTCP Biennial Report - Calendar Years 2011-2012

13

FTCP Operational Plan and Closeout Summary, Fiscal Year 2011 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operational Plan and Closeout Summary, Fiscal Year 2011 Operational Plan and Closeout Summary, Fiscal Year 2011 FTCP Operational Plan and Closeout Summary, Fiscal Year 2011 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2011 Operational Plan FY2011 Operational Plan Closeout Summary More Documents & Publications FTCP Biennial Report - Calendar Years 2011-2012

14

FTCP OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 FTCP OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2009 Operational Plan FY2009 Operational Plan - Goal 1 Summary FY2009 Operational Plan - Goal 2 Summary

15

PROBLEMS ENCOUNTERED DURING FOUR YEARS OF ORR OPERATION  

SciTech Connect

The over-all design and operation of ORR is reviewed in the light of four years of operating experience. Items discussed consist of the reactor components and instrumentation, reactor and pool cooling systems (including system cleanup), the emergency systems for electric power and reactor cooling, the waste-disposal systems (liquid, gaseous, and solid), and the building, itself. The ORR was the first of a class of reactors which combined the features of both the pool-reactor and tank-reactor types. Four years of operation indicated areas where problems of various degrees have developed. These problems are discussed. (auth)

Tabor, W.H.; Costner, R.A. Jr.

1962-08-23T23:59:59.000Z

16

WIPP Marks 12 Years of Operations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marks 12 Years of Operations Marks 12 Years of Operations WIPP Marks 12 Years of Operations March 28, 2011 - 12:00pm Addthis Media Contact Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 CARLSBAD, N.M - On Saturday, March 26, 2011, the Department of Energy's Waste Isolation Pilot Plant marked another anniversary. It has now been 12 years since WIPP received its first shipment of transuranic (TRU) waste. TRU waste consists of clothing, tools, rags, debris, residues and other disposal items contaminated with radioactive elements - mostly plutonium. "WIPP employees and members of the community cheered when the first shipment of TRU waste arrived here in 1999," said Acting Carlsbad Field Office Manager Ed Ziemianski. "I applaud their continued dedication to our nation, which has placed its trust in WIPP to maintain those rigorous

17

Draft Supplement to the Environmental Statement Fiscal Year 1976 Proposed Program : Facility Location Evaluation for Pebble Springs-Marion 500-KV Line Study Area 75-B.  

SciTech Connect

Proposed is construction of an approximately 160 mile long, 500-kV, double-circuit transmission line from the proposed Pebble Springs Substation located southeast of Arlington, Oregon, to the existing Marion Substation, 11 miles west of Maupin, Oregon. Development is also proposed of a major switching complex, Pebble Springs Substation, near Arlington, Oregon. Depending on the final route chosen, from 45 to 71 miles of parallel, 9 to 42 miles of new, and 74 miles of existing right-of-way will be required. New access road requirements will range from 45 to 90 miles. Land use affected by the proposed facilities includes 800 to 855 acres of forestland removed from timber production. In addition, 50 miles of cropland, primarily wheat, and approximately 35 miles of grassland will be crossed. Disturbance to wildlife during construction will occur and habitat associated with the above land uses will be eliminated. Soil erosion and siltation, primarily during and immediately after construction will also occur. Visual impacts will occur near several highways, lakes, rivers, and recreation areas. Disturbances to nearby residents will occur during construction. An additional 45 acres of rangeland will be required for the proposed Pebble Springs Substation.

United States. Bonneville Power Administration.

1974-10-22T23:59:59.000Z

18

Operations, Maintenance, and Replacement 10-Year Plan, 1990 -1999.  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the late summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-Year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

United States. Bonneville Power Administration.

1990-08-01T23:59:59.000Z

19

Operations, Maintenance, and Replacement 10-Year Plan, 1990--1999  

SciTech Connect

In 1988 Bonneville Power Administration (BPA) began work on this Operations, Maintenance, and Replacement 10-Year Plan to develop a levelized program that would assure high system reliability. During the Programs in Perspective (PIP) meetings in the later summer and fall of 1988, many of the concerns to be addressed in an Operations, Maintenance, and Replacement Plan were identified. Following these PIP meetings BPA established internal work groups. During the winter and spring of 1989, these work groups developed technical background and issue papers on topics that ranged from substation maintenance to environmental protection. In addition, a customer forum group was established and met on several occasions to review work on the plan, to offer ideas and points of view, and to assure that BPA understood customer concerns. Based on recommendations from the work group reports and customer input, BPA's O M Management Team developed the draft Operations, Maintenance, and Replacement 10-Year Plan that was released for public comment during the spring of 1990. During the public review period, BPA received a number of written comments from customers and the interested public. In addition, special meetings were held with interested customers. This final Operations, Maintenance, and Replacement 10-year Plan reflects BPA's response to customers and interested public on each topic discussed in the 10-Year Plan. The plan is a distillation of BPA's strategies to achieve a levelized program over 10 years.

Not Available

1990-08-01T23:59:59.000Z

20

Fermi Large Area Telescope Operations: Progress Over 4 Years  

SciTech Connect

The Fermi Gamma-ray Space Telescope was launched into orbit in June 2008, and is conducting a multi-year gamma-ray all-sky survey, using the main instrument on Fermi, the Large Area Telescope (LAT). Fermi began its science mission in August 2008, and has now been operating for almost 4 years. The SLAC National Accelerator Laboratory hosts the LAT Instrument Science Operations Center (ISOC), which supports the operation of the LAT in conjunction with the Mission Operations Center (MOC) and the Fermi Science Support Center (FSSC), both at NASA's Goddard Space Flight Center. The LAT has a continuous output data rate of about 1.5 Mbits per second, and data from the LAT are stored on Fermi and transmitted to the ground through TDRS and the MOC to the ISOC about 10 times per day. Several hundred computers at SLAC are used to process LAT data to perform event reconstruction, and gamma-ray photon data are subsequently delivered to the FSSC for public release with a few hours of being detected by the LAT. We summarize the current status of the LAT, and the evolution of the data processing and monitoring performed by the ISOC during the first 4 years of the Fermi mission, together with future plans for further changes to detected event data processing and instrument operations and monitoring.

Cameron, Robert A.; /SLAC

2012-06-28T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

22

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

23

The Defense Waste Processing Facility: Two Years of Radioactive Operation  

Science Conference Proceedings (OSTI)

The Defense Waste Processing Facility (DWPF) at the Savannah River Site in Aiken, SC is currently immobilizing high level radioactive sludge waste in borosilicate glass. The DWPF began vitrification of radioactive waste in May, 1996. Prior to that time, an extensive startup test program was completed with simulated waste. The DWPF is a first of its kind facility. The experience gained and data collected during the startup program and early years of operation can provide valuable information to other similar facilities. This experience involves many areas such as process enhancements, analytical improvements, glass pouring issues, and documentation/data collection and tracking. A summary of this experience and the results of the first two years of operation will be presented.

Marra, S.L. [Westinghouse Savannah River Company, AIKEN, SC (United States); Gee, J.T.; Sproull, J.F.

1998-05-01T23:59:59.000Z

24

Coal operators prepare for a prosperous new year  

Science Conference Proceedings (OSTI)

Results are given of the Coal Age 2008 annual Forecast Survey of 17 coal mining executives which reinforces that 2008 could be a very good year. Coal operators are planning to invest in new equipment, development and new coal mine start-ups, based on a number of demand- and supply-side fundamentals. 71% of those surveyed thought coal production in 2008 would increase from 2007 levels and US exports are expected to climb due to the weak dollar. If the tax credit on synfuels expires on 31 December 2007 production of coal synfuel will likely cease. Asked about expensive planned purchases, companies answers ranged from $80,000 for an underground scoop to $500 m for a new mine installation. However, most producers admit they will not be able to operate at full capacity. 7 figs.

Fiscor, S.

2008-01-15T23:59:59.000Z

25

Categorical Exclusion (CX) Determination Proposed Action: Elliot 115kV/43.8kV Transmission Substation Construction and Elliot  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Elliot 115kV/43.8kV Transmission Substation Construction and Elliot Elliot 115kV/43.8kV Transmission Substation Construction and Elliot 43.8kV Transmission Line. Description of Proposed Action: The Central Power Electric Cooperative (Central Power) is proposing a new substation near Elliot, ND to be owned and operated by Western under Western's Valley City to Forman 115kV transmission line in addition to 8 miles of new 43.8kV transmission line to connect the new substation to Dakota Valley Electric's (a Central Power member) North Milnor substation. Number and Title of Categorical Exclusions Being Applied: 10 CFR 1021.410 Subpart D, Appendix B, B4.l1: Construction of electric power substations ... or modification of existing substations and support facilities. Regulatory Requirements for CX Determination: The DOE Guidelines for Compliance with

26

Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick  

Science Conference Proceedings (OSTI)

This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

NONE

1993-10-01T23:59:59.000Z

27

MFTF 230 kV pulsed power substation  

SciTech Connect

The Mirror Fusion Test Facility (MFTF) currently under construction at the Lawrence Livermore Laboratory includes a Sustaining Neutral Beam Power Supply System (SNBPSS) consisting of 24 power-supply sets. The System will operate in long pulses (initially .5 seconds and eventually 30 seconds) at high power (200 MW), which will necessitate a large source of ac power. To meet this requirement, a new 230-kV substation is also being built at LLL. The constraints of cost, equipment protection, short operating lifetime (10 years), and reliability dictated a unique substation design. Its unusual features include provisions for fast fault detection and tripping, a capability for limiting ground fault current, low impedance, and economical design.

Wilson, J.H.

1979-11-12T23:59:59.000Z

28

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's...

29

Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison: Final Report  

Science Conference Proceedings (OSTI)

Following up the successful testing of a complete 50 m, 115 kV high temperature superconducting (HTS) power cable system prototype, EPRI, Pirelli Power Cables and Systems, the Department of Energy, Detroit Edison, and American Superconductor Corporation undertook a project to design, install, and operate a 24 kV HTS power cable at Detroit Edison's Frisbie substation to serve customer load. The demonstration cable circuit ran approximately 120 m between the 24 kV bus distribution bus and a 120 kV-24 kV tr...

2004-12-22T23:59:59.000Z

30

United States Department of Energy, Nevada Operations Office, completion report Operation KLAXON, Fiscal Year 1993  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guide for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.

Not Available

1994-06-01T23:59:59.000Z

31

SP-100 operational life model. Fiscal Year 1990 annual report  

DOE Green Energy (OSTI)

This report covers the initial year`s effort in the development of an Operational Life Model (OLM) for the SP-100 Space Reactor Power System. The initial step undertaken in developing the OLM was to review all available documentation from GE on their plans for the OLM and on the degradation and failure mechanisms envisioned for the SP-100. In addition, the DEGRA code developed at JPL, which modelled the degradation of the General Purpose Heat Source based Radioisotope Thermoelectric Generator (GPHS-RTG), was reviewed. Based on the review of the degradation and failure mechanisms, a list of the most pertinent degradation effects along with their key degradation mechanisms was compiled. This was done as a way of separating the mechanisms from the effects and allowing all of the effects to be incorporated into the OLM. The emphasis was on parameters which will tend to change performance as a function of time and not on those that are simply failures without any prior degradation.

Ewell, R.; Awaya, H.

1990-12-14T23:59:59.000Z

32

Four years of operations and results with FORTE  

DOE Green Energy (OSTI)

The FORTE (Fast Onboard Recording of Transient Events) satellite was launched on 29 August 1997 and has been in continuous operation since that time. FORTE was placed in a nearly circular, 825-km-altitude, 70 degrees inclination orbit by a Pegasus rocket funded by Air Force Space Test Program. The Department of Energy funded the FORTE satellite, which was designed and built at Los Alamos. FORTE's successful launch and engineered robustness were a result of several years of dedicated work by the joint Los Alamos National Laboratory/Sandia National Laboratory project team, led through mission definition, payload and satellite development, and launch by Dr. Stephen Knox. The project is now led by Dr. Abram Jacobson. FORTE carries a suite of instruments, an optical system and a rf system, for the study of lightning and anthropogenic signals. As a result of this effort, new understandings of lightning events have emerged as well as a more complete understanding of the relationship between optical and rf lightning events. This paper will provide an overview of the FORTE satellite and will discuss the on orbit performance of the subsystems.

Klingner, P. L. (Phillip L.); Carlson, L. D. (Leslie D.); Dingler, R. D. (Robert D.); Esch-Mosher, D. M. (Diana M.); Jacobson, A. R.; Roussel-Dupre, D. (Diane)

2001-01-01T23:59:59.000Z

33

FOUR YEARS OF OPERATIONS AND RESULTS WITH FORTE  

DOE Green Energy (OSTI)

The FORTE (Fast Onboard Recording of Transient Events) satellite was launched on 29 August 1997 and has been in continuous operation since that time. FORTE was placed in a nearly circular, 825-km-altitude, 70 degrees inclination orbit by a Pegasus rocket funded by Air Force Space Test Program. The Department of Energy funded the FORTE satellite, which was designed and built at Los Alamos. FORTE's successful launch and engineered robustness were a result of several years of dedicated work by the joint Los Alamos National Laboratory/Sandia National Laboratory project team, led through mission definition, payload and satellite development, and launch by Dr. Stephen Knox. The project is now led by Dr. Abram Jacobson. FORTE carries a suite of instruments, an optical system and a rf system, for the study of lightning and anthropogenic signals. As a result of this effort, new understandings of lightning events have emerged as well as a more complete understanding of the relationship between optical and rf lightning events. This paper will provide an overview of the FORTE satellite and will discuss the on orbit performance of the subsystems.

D. ROUSSEL-DUPRE; P. KLINGNER; L. CARLSON; ET AL

2001-06-01T23:59:59.000Z

34

Retrofit of an existing 160 MVA 69KV major Chicago downtown substation to 200 MVA 138KV while maintaining continuity of service  

SciTech Connect

In 1957 Transmission Substation 68, LaSalle, (TSS 68) was placed in service. This paper reports that the station consists of four 40 MVA 69 kV/12 kV transformers which feed two 12 kV ring buses. The 12 kV switchgear is housed on the first and second floors of a 62 year old structurally sound building. Located on the south and west sides of this building are the four transformers. The entire station is located on a parcel of land approximately 14,000 square feet.

Czernenko, G.P. (Commonwealth Edison Co., Chicago, IL (United States))

1992-01-01T23:59:59.000Z

35

Proposed 230-kV Crossover Substation, Big Horn County, Montana: Environmental assessment  

SciTech Connect

Western proposes to construct, operate, and maintain a 230-kV substation northwest of Hardin, Big Horn County, Montana. The proposed Crossover Substation would form an interconnection between Western's Yellowtail-Custer and MPC's Colstrip-Billings 230-kV transmission lines. Impacts and mitigation strategies are discussed.

1984-02-01T23:59:59.000Z

36

APS Long-Range Operations Schedule (Fiscal Year 2014)  

NLE Websites -- All DOE Office Websites (Extended Search)

Schedule (Fiscal Year 2014) Schedule (Fiscal Year 2014) Run 2013-3 Run 2014-1 Run 2014-2 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 2 2 2 2 1 1 1 2 2 2 2 1 1 1 2 2 3 3 1 1 1 3 3 3 3 1 1 1 3 3 3 3 1 1 1 3 3 4 4 1 1 1 4 4 4 4 4 4 1 4 4 4 4 1 4 4 5 5 1 5 4 4 4 5 5 5 1 1 5 5 5 5 5 5 6 6 1 1 6 4 4 4 6 6 6 1 1 1 6 6 6 6 6 6 7 7 1 1 1 7 4 4 4 7 7 7 1 1 1 7 7 7 7 7 7 8 8 1 1 1 8 4 4 4 8 8 8 1 1 1 8 8 8 8 1 1 8 8 9 9 1 1 1 9 4 4 4 9 9 9 1 1 1 9 9 9 9 1 1 1 9 9 10 10 1 1 1 10 4 10 10 10 1 1 1 10 10 10 10 1 1 1 10 10 11 11 1 11 4 4 11 11 11 1 11 11 11 11 1 1 1 11 11 12 12 12 4 4 4 12 12 12 4 4 12 12 12 12 1 1 1 12 12 13 13 13 4 4 4 13 13 13 4 4 4 13 13 13 13 1 1

37

Draft Supplement to the Environmental Statement Fiscal Year 1976 Proposed Program : Facilty Location Evaluation for Franklin-Badger Canyon 230-kV Line and Badger Canyon Substation Study Area 74-6B.  

SciTech Connect

Proposed is the construction of a 15-mile, 230-kV double-circuit transmission line from Franklin Substation near Pasco, Washington, to a proposed new Badger Canyon Substation to be constructed 5 miles west of Kennewick, Washington. Depending on the final route location chosen, approximately 15 miles of 230-kV double circuit transmission line requiring 5.6 miles of new and 9.4 miles of existing right-of-way would be needed as well as approximately 2500 feet of new access road. Land use affected includes crossing Sacajawea State Park and passig through irrigated cropland and grassland on existing right-of-way, and depending on the alternative route chosen, could cross land proposed for residential development and a proposed interstate highway. An additional 10 to 11 acres of potential cropland would be required for the proposed substation. Disturbance to wildlife during construction would occur and habitat associated with the above land uses would be eliminated. Some erosion and sedimentation would occur. Visual impacts would affect Sacajawea State Park, a proposed highway, and potential residential development land. Noise and other disturbances to residents will occur, primarily during construction.

United States. Bonneville Power Administration.

1974-10-22T23:59:59.000Z

38

STABILIZED HIGH INTENSITY SOURCE OF 80 kv  

SciTech Connect

With the change of the current load from 0 to 2.5 mamp and simultaneous change of incoming intensity from 270 to 190 v, the stabilized high-intensity source changes less than l%.. The stabilized intensity can be arranged in steps of 5 kv from 60 to 80 kv. The high-intensity stabilizer automatically switches on upon reaching 60 kv. (tr-auth)

Polivanov, V.V.; Izyurov, A.V.; Pyatakov, N.I.

1959-09-01T23:59:59.000Z

39

FTCP OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 FTCP OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 The objective of the Federal Technical Capability Program is to recruit, deploy, develop, and retain Federal personnel with the necessary technical capabilities to safely accomplish the Department's missions and responsibilities. The operational plan documents the processes and goals focused on improving the overall implementation of the Program by continuing to implement an integrated approach throughout DOE with clear roles and responsibilities and accountability to include effective line management oversight by Federal organizations. FY2010 Operational Plan FY2010 Operational Plan - Goal 1 Summary FY2010 Operational Plan - Goal 2 Summary FY2010 Operational Plan - Goal 3 Summary

40

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

1994-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

CEBAF 200 kV Inverted Electron Gun  

Science Conference Proceedings (OSTI)

Two DC high voltage GaAs photoguns have been built at Jefferson Lab based on a compact inverted insulator design. One photogun provides the polarized electron beam at CEBAF and operates at 130 kV bias voltage. The other gun is used for high average current lifetime studies at a dedicated test facility and has been operated at bias voltage up to 225 kV. The advantages of higher DC voltage for CEBAF include reduced space-charge emittance growth and the potential for prolonged photocathode lifetime. However, a consequence of operating at higher voltages is the increased likelihood of field emission or breakdown, both of which are unacceptable. Highlights of the R&D studies leading toward a production 200keV GaAs photogun for CEBAF will be presented.

J.M. Grames, P.A. Adderley, J. Clark, J. Hansknecht, M. Poelker, M.L. Stutzman, R. Suleiman, K.E.L. Surles-Law

2011-03-01T23:59:59.000Z

42

DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exercises 5 Year Option on Washington TRU Solutions Contract to Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP January 18, 2005 - 9:55am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) announced today that it has decided to exercise the five year option in the Washington TRU Solutions LLC ("WTS") contract to continue managing and operating the Department's Waste Isolation Pilot Plant (WIPP), located in New Mexico. The option DOE exercised is a part of the WIPP contract that was competitively procured in 2000. The WTS contract will now run through September 30, 2010 with an estimated value over the five year timeframe of approximately $704 million. "We are very pleased to take this step," said Kyle McSlarrow, Deputy

43

A 50 kV solid state multipulse kicker modulator  

DOE Green Energy (OSTI)

Performance requirements, design concepts, and test results for a prototype multipulse kicker modulator based on solid-state switches and a voltage-adding transformer topology are described. Tape-wound cores are stacked to form the transformer primary windings and a cylindrical pipe that passes through the circular inner diameters of the cores serves as the secondary winding of the step-up transformer. Boards containing MOSFET switches, trigger circuitry, and energy-storage capacitors plug into the core housings. A 50 kV prototype modulator that meets most of the facility requirements has been designed, fabricated, and tested at LLNL. More recent work has been concerned with designing and testing cores and boards with the full volt-second capability needed for 24-pulse operation. Results of the 50 kV prototype tests, preliminary tests of the full-volt-second cores and boards, and future development needs are described.

Walstrom, P. L. (Peter L.); Cook, E. G. (Edward G.)

2003-01-01T23:59:59.000Z

44

RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3  

SciTech Connect

RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

Not Available

1993-12-01T23:59:59.000Z

45

Carbon Storage Partner Completes First Year of CO2 Injection Operations in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Storage Partner Completes First Year of CO2 Injection Storage Partner Completes First Year of CO2 Injection Operations in Illinois Carbon Storage Partner Completes First Year of CO2 Injection Operations in Illinois November 19, 2012 - 12:00pm Addthis Washington, DC - A project important to demonstrating the commercial viability of carbon capture, utilization and storage (CCUS) technology has completed the first year of injecting carbon dioxide (CO2) from an industrial plant at a large-scale test site in Illinois. Led by the Illinois State Geological Survey, the Illinois Basin-Decatur Project is the first demonstration-scale project in the United States to use CO2 from an industrial source and inject it into a saline reservoir. The CO2 is being captured from an ethanol production facility operated by the Archer Daniels Midland Company in Decatur, Ill., and is being injected

46

Field Demonstration of a 24-kV Warm Dielectric Superconducting Cable at Detroit Edison: FY2003 Annual Progress Report  

Science Conference Proceedings (OSTI)

A project sponsored by EPRI, Pirelli Power Cables and Systems, the Department of Energy, Detroit Edison, and American Superconductor Corporation was initiated in 1998 to install and operate a 24 kV HTS power cable in a Detroit Edison substation to serve customer load. The previous years of activity have focused on design, testing, manufacturing, and installation of the cable system as described in the FY2000 and FY2001 status reports. The FY2002 status report focused on leak detection. The cornerstone of...

2004-03-30T23:59:59.000Z

47

EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

79: Grand Coulee's Third Powerplant 500-kV Transmission Line 79: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington Summary This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE's Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior's Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011. BPA website: http://efw.bpa.gov/environmental_services/Document_Library/Grand_Coulee/

48

Results from the second year of operation of the federal methanol fleet at Lawrence Berkeley Laboratory  

DOE Green Energy (OSTI)

This interim report describes the second year's operation of the methanol fleet at Lawrence Berkeley Laboratory (LBL) in Berkeley, California. The fleet consists of five 1984 methanol-fueled Chevrolet Citation sedans paired with five comparable gasoline-fueled Citations for comparison. Data have been collected and tabulated on fuel consumption, maintenance records, oil sample analyses, and driver perceptions of vehicle operability. Fuel efficiency was slightly improved as compared to the first year for both the methanol and gasoline vehicles. The methanol vehicles continued to experience slightly less energy efficiency than the gasoline vehicles. Maintenance data reveal that the methanol vehicles required substantially more service than the gasoline vehicles, which may be due partially to a greater sensitivity on the part of users about methanol vehicle problems. Oil sample analyses revealed that engine wear rates are lower for the second year as compared to the first year and are probably not cause for great alarm. Drivers still rate all of the vehicles quite highly, but the methanol vehicles were rated not as highly during the second year of operation as in the first year. 5 refs., 1 figs., 16 tabs.

McGill, R.N.; Hillis, S.L.

1988-08-01T23:59:59.000Z

49

EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

65: Davis-Kingman 69-kV Transmission Line Rebuild Project, 65: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona Overview Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis-Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service. The line has been in service well beyond its projected service life, customer load on the line has increased considerably over the years, and reliability has decreased due to natural aging, extreme weather exposure, vandalism, and lightning strikes. The western-most 0.7 mile of the existing line was rebuilt as part of the Davis Dam Switchyard in 2010. Public Comment Opportunities No public comment opportunities available at this time.

50

Alameda 115-kV project  

SciTech Connect

Faced with an increasing demand for electricity, the Bureau of Electricity in Alameda, California decided to investigate alternative means to increase reliability, reduce losses and provide for economic expansion of the power supply system. The investigation indicated the need for 115-kV service to interconnect the Pacific Gas and Electric Company Substation C in Oakland with the Bureau's Atlantic Substation on Alameda Island, a distance of approximately 1.5 miles. Detailed planning and design for the 115-kV project was undertaken. Extensive studies were performed to select the route and determine the design. The studies are described.

1985-01-01T23:59:59.000Z

51

Naval Petroleum and Oil Shale Reserves annual report of operations for fiscal year 1996  

SciTech Connect

During fiscal year 1996, the Department of Energy continued to operate Naval Petroleum Reserve No. 1 in California and Naval Petroleum Reserve No. 3 in Wyoming through its contractors. In addition, natural gas operations were conducted at Naval Petroleum Reserve No. 3. All productive acreage owned by the Government at Naval Petroleum Reserve No. 2 in California was produced under lease to private companies. The locations of all six Naval Petroleum and Oil Shale Reserves are shown in a figure. Under the Naval Petroleum Reserves Production Act of 1976, production was originally authorized for six years, and based on findings of national interest, the President was authorized to extend production in three-year increments. President Reagan exercised this authority three times (in 1981, 1984, and 1987) and President Bush authorized extended production once (in 1990). President Clinton exercised this authority in 1993 and again in October 1996; production is presently authorized through April 5, 2000. 4 figs. 30 tabs.

1996-12-31T23:59:59.000Z

52

Quality Assurance Plan for site electrical replacements at substation line item subproject: 69 KV Substation  

Science Conference Proceedings (OSTI)

The 69 KV Substation Project is based on the recognized need to provide a continuous, reliable source of power and to improve the firm capacity of the electrical service to all production facilities at Mound. The project consists of the following major element: 69 KV Substation: (1) Install a 69 KV Substation and associated equipment with two parallel 18 MVA transformers. (2) Install duct bank as required and provide 15 KV feeder cable from new substation to existing Substation 95 for connection to Mound`s existing primary distribution system. (3) Install duct bank for underground routing of the 15 KV feeder cable from Manhole 5C to the existing power house cable pit. (4) Reconfigure existing Dayton Power and Light Co. 15 KV switchgear in P Building. The purpose of this Quality Assurance Plan (QA Plan) is to assure that the objectives of the United States Department of Energy (D.O.E.) and EG&G Mound Applied Technologies, Miamisburg, Ohio (Mound) are met for this non-weapons project relative to health and safety, protection of the environment, reliability and continuity of operations, and documentation of quality efforts. This QA Plan identifies the activities and responsibilities which are necessary in the design, procurement, fabrication, installation, and start up of this project in order to meet these objectives.

Ohler, C.K.

1991-05-21T23:59:59.000Z

53

Operation of an on-line substation diagnosis system  

SciTech Connect

On-line monitoring systems for substation equipment are expected to give an impact on the improvement of the reliability of the power system. A monitoring system was applied to one of the newly built substations. It monitors the 204 kV and 72 kV GIS's and the transformer in their normal operation condition. The basic philosophy of the monitoring system and the principle of the detection of the abnormality is introduced together with the record of its operation in the first year.

Fujimoto, Y.; Ono, T. (Shikoku Electric Power Co., Inc., Takamatsu (JP)); Ibuki, K.; Taka, S. (Itami Works, Mitsubishi Electric Corp., Amagasaki (JP))

1988-10-01T23:59:59.000Z

54

Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1992  

SciTech Connect

During fiscal year 1992, the reserves generated $473 million in revenues, a $181 million decrease from the fiscal year 1991 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $200 million, resulting in net cash flow of $273 million, compared with $454 million in fiscal year 1991. From 1976 through fiscal year 1992, the Naval Petroleum and Oil Shale Reserves generated more than $15 billion in revenues and a net operating income after costs of $12.5 billion. In fiscal year 1992, production at the Naval Petroleum Reserves at maximum efficient rates yielded 26 million barrels of crude oil, 119 billion cubic feet of natural gas, and 164 million gallons of natural gas liquids. From April to November 1992, senior managers from the Naval Petroleum and Oil Shale Reserves held a series of three workshops in Boulder, Colorado, in order to build a comprehensive Strategic Plan as required by Secretary of Energy Notice 25A-91. Other highlights are presented for the following: Naval Petroleum Reserve No. 1--production achievements, crude oil shipments to the strategic petroleum reserve, horizontal drilling, shallow oil zone gas injection project, environment and safety, and vanpool program; Naval Petroleum Reserve No. 2--new management and operating contractor and exploration drilling; Naval Petroleum Reserve No. 3--steamflood; Naval Oil Shale Reserves--protection program; and Tiger Team environmental assessment of the Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming.

1992-12-31T23:59:59.000Z

55

NETL: News Release - Solid Oxide Fuel Cell Reaches One Year of Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

January 31, 2000 January 31, 2000 Solid Oxide Fuel Cell Reaches One Year of Operations Netherlands Test Boosts Confidence for Commercial Introduction by 2004 An experimental all solid-state fuel cell - the possible prototype for a future "combustion-less" power plant - has passed a key milestone in a joint public-private development effort. Schematic Diagram of Tubular Solid Oxide Fuel Cell The Siemens Westinghouse solid oxide fuel cell is a tubular arrangement of concentric ceramic electrodes and a solid-state electrolyte. Siemens-Westinghouse Power Corp., headquartered in Orlando, FL, announced this week that its 100-kilowatt solid oxide fuel cell power system, the world's largest, has completed one year of total operating time, the longest any fuel cell of this type and size has run. The milestone marked

56

Electric Vehicle Site Operator Program. Year 1 third quarter report, January 1, 1992--March 31, 1992  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Through participation is this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort stationwagons.

Not Available

1992-06-01T23:59:59.000Z

57

DOE KSU EV Site Operator Program. Year 1, fourth quarter report, April 1--June 30, 1992  

SciTech Connect

Kansas State University, with funding from federal, state, public, and private companies, is participating in the DOE Electric Vehicle Site Operator Program. Kansas State is demonstrating, testing, and evaluating electric of hybrid vehicle technology. This will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four(4) electric cars during the first two years of this five-year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort station wagons. This quarter`s report describes ongoing public relations activities and meetings as well as presenting performance data for the electric vehicles. (GHH)

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1992-08-01T23:59:59.000Z

58

Safety implications from 20 years of operating experience at EBR-II  

Science Conference Proceedings (OSTI)

EBR-II recently passed a major milestone in its operating history, 20 years of operation on August 13, 1984. The plant has gone through three major program phases during this time and is now entering a fourth. Those are: (1) demonstration of the feasibility of a complete LMFBR power plant, including on-site reprocessing of metal fuel, (2) irradiation testing of fuels and materials to support core and fuel design for CRBR and FFTF, (3) operational-safety testing to establish and demonstrate the inherent safety of LMFBRs and now, (4) the integration of this technology into demonstration of the integral fast reactor (IFR) concept. As EBR-II has progressed through these phases, much has been learned that is relevant to fast-reactor safety.

Sackett, J.I.; Buschman, H.W.

1985-01-01T23:59:59.000Z

59

Field Demonstration of a 24-kV Superconducting Cable at Detroit Edison  

SciTech Connect

Customer acceptance of high temperature superconducting (HTS) cable technology requires a substantial field demonstration illustrating both the system's technical capabilities and its suitability for installation and operation within the utility environment. In this project, the world's first underground installation of an HTS cable using existing ductwork, a 120 meter demonstration cable circuit was designed and installed between the 24 kV bus distribution bus and a 120 kV-24 kV transformer at Detroit Edison's Frisbie substation. The system incorporated cables, accessories, a refrigeration system, and control instrumentation. Although the system was never put in operation because of problems with leaks in the cryostat, the project significantly advanced the state-of-the-art in the design and implementation of Warm Dielectric cable systems in substation applications. Lessons learned in this project are already being incorporated in several ongoing demonstration projects.

Kelley, Nathan; Corsaro, Pietro

2004-12-01T23:59:59.000Z

60

Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne  

Science Conference Proceedings (OSTI)

OAK A271 Site Environmental Report for Calendar Year 1999. DOE Operations at The Boeing Company, Rocketdyne. This Annual Site Environmental Report (ASER) for 1999 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL). In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials under the former Atomics International Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned, company-operated test facility within Area IV. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D&D) of the previously used nuclear facilities and associated site areas. Large-scale D&D activities of the sodium test facilities began in 1996. This Annual Site Environmental Report provides information showing that there are no indications of any potential impact on public health and safety due to the operations conducted at the SSFL. All measures and calculations of off-site conditions demonstrate compliance with applicable regulations, which provide for protection of human health and the environment.

None

2000-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Field Demonstration of a 24-kV Warm Dielectric Cable at Detroit Edison: FY2002 Annual Progress Report for the Detroit Edison HTS Cab le Field Demonstration Project  

Science Conference Proceedings (OSTI)

A project sponsored by EPRI, Pirelli Power Cables and Systems, the Department of Energy, Detroit Edison, and American Superconductor Corporation was initiated in 1998 to install and operate a 24 kV high temperature superconductor (HTS) power cable in a Detroit Edison substation to serve customer load. The previous years of activity have focused on design, testing, manufacturing, and installation of the cable system as described in the FY2000 and FY2001 status reports. The successful implementation of thi...

2003-02-26T23:59:59.000Z

62

Results from the first year of operation of the Federal Methanol Fleet at Argonne National Laboratory  

DOE Green Energy (OSTI)

The Oak Ridge National Laboratory, under the auspices of the Department of Energy's Alternative Fuels Utilization Program, has managed the Federal Methanol Fleet Project since its inception in fiscal year 1985. This congressionally-mandated project directed the Department of Energy to introduce methanol-fueled vehicles into civilian government fleet operations. This interim report describes the first year of operation of a methanol fleet at Argonne National Laboratory in Argonne, Illinois. The fleet consists of five methanol-fueled 1986 Chevrolet S-10 pickup trucks along with five Chevrolet S-10s for comparison, as well as five methanol-fueled 1986 Ford Crown Victorias paired with four gasoline Fords. Data have been collected and tabulated on fuel consumption, maintenance records, oil sample analyses, and driver perceptions of vehicle operability. Energy efficiency for the methanol vehicles was slightly greater than that for the counterpart gasoline vehicles. Maintenance records reveal that the methanol vehicles required substantially more service than the gasoline vehicles, but a large proportion of the difference was due to methanol component replacements where improvements or upgrades were scheduled to be implemented after the vehicles were in service. Oil sample analyses revealed that engine wear rates were higher in the methanol vehicles. Drivers indicated that the methanol vehicles are quite acceptable, but they rated the gasoline vehicles higher. The Argonne fleet serves as the cold-weather site of the Federal Methanol Fleet and, as such, the methanol vehicles have been outfitted with special systems to aid in cold-starting and driveability.

McGill, R.N.; Hillis, S.L.; Larsen, R.P.

1988-10-01T23:59:59.000Z

63

Wild Horse 69-kV transmission line environmental assessment  

SciTech Connect

Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

NONE

1996-12-01T23:59:59.000Z

64

Superconducting Super Collider site environmental report for calendar year 1991. Pre-operational  

SciTech Connect

This is the first annual SER prepared for the SSC project. It is a pre-operational report, intended primarily to describe the baseline characterization of the Ellis County, Texas site that has been developed subsequent to the Environmental Impact Statement (EIS) and the Supplemental Environmental impact Statement (SEIS). As such, the emphasis will be on environmental compliance efforts, including monitoring and mitigation programs. The SER also reports on the measures taken to meet the commitments made in the EIS and SEIS. These measures are detailed in the Mitigation Action Plan (MAP) (Department of Energy (DOE), 1991), which was prepared following the signing of the Record of Decision (ROD) to construct the SSC in Texas. The SER will continue to be preoperational until the first high-energy (20 trillion electron volt or TeV) protons collisions are observed, at which point the SSC will become operational. At that time, the SER will place more emphasis on the radiological monitoring program. This SER will report on actions taken in 1991 or earlier and briefly mention some of those planned for calendar year 1992. AU actions completed in 1992 will be addressed in the SER for calendar year 1992.

NONE

1995-05-01T23:59:59.000Z

65

Site Environmental Report for calendar year 1998, DOE operations at Rocketdyne Propulsion and Power  

SciTech Connect

This Annual Site Environmental Report for 1998 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL) and De Soto facilities. In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned company-operated, test facility within Area IV. AI was merged into Rocketdyne in 1984 and many of the AI functions were transferred to existing Rocketdyne departments. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D and D) of the previously used nuclear facilities and associated site areas. Large-scale D and D activities of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 1998 continue to indicate that there are no significant releases of radioactive material from Rocketdyne sites. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, and direct radiation. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway.

Rutherford, P.D. [ed.] [ed.

1999-09-22T23:59:59.000Z

66

CEBAF 200 kV Inverted Electron Gun  

Science Conference Proceedings (OSTI)

Two DC high volt­age GaAs pho­to­guns have been built at Jef­fer­son Lab based on a com­pact in­vert­ed in­su­la­tor de­sign. One pho­to­gun pro­vides the po­lar­ized elec­tron beam at CEBAF and op­er­ates at 130 kV bias volt­age. The other gun is used for high av­er­age cur­rent life­time stud­ies at a ded­i­cat­ed test fa­cil­i­ty and has been op­er­at­ed at bias volt­age up to 225 kV. The ad­van­tages of high­er DC volt­age for CEBAF in­clude re­duced space-charge emit­tance growth and the po­ten­tial for pro­longed pho­to­cath­ode life­time. How­ev­er, a con­se­quence of op­er­at­ing at high­er volt­ages is the in­creased like­li­hood of field emis­sion or break­down, both of which are un­ac­cept­able. High­lights of the R&D stud­ies lead­ing to­ward a pro­duc­tion 200keV GaAs pho­to­gun for CEBAF will be pre­sent­ed.

Grames, J M; Clark, J; Hansknecht, J; Poelker, M; Stutzman, M L; Suleiman, R; Surles-Law, K.E.L.; BastaniNejad, M

2011-03-01T23:59:59.000Z

67

SUMMARY OF REACTOR DESIGN INFORMATION FROM THREE YEARS' OPERATION OF A SMALL PWR  

SciTech Connect

Reactor design information obtained from 3 years' operation of a small pressurized-water reactor, the SM-1 (formerly APPR-l), is presented and discussed. The SM-1 reactor, designed to produce 10 Mw(t) power, employs fully enriched uranium fuel in the form of UO/sub 2/ dispersed in stainless-steel fuel plates. The reactor is cooled by water at 1200 psia and mean temperature of 44) deg F. Core-physics measurements were performed of temperature coefficient, pressure coefficient, rod calibration, stuck rod position, and transient xenon as a function of core burn-out. Core burn-out characteristics were compared with few- group calculations, and reasonable agreement was obtained. Thermal-heat-balance data were obtained on the reactor core. The temperature pattern in the nominal and hot channels under operating conditions was calculated. These calculations indicated that certain of the fuel channels operated in the nucleate boiling regime. Examination of one of the fuel channels suspected of nucleate boiling indicated no adverse effects. The system response to load perturbations and during pump coast-down was measured utilizing plant instrumentation. This response was compared with analytical predictions using a lumped kinetic model, and reasonable agreement was found. Both neutron and gamma traverses were made through the primary shield during reactor operation. Gamma traverses were also made through the primary shield as a function of time after reactor shutdown. Conventional shielding calculational methods are found to give agreement with experiment sufficient for design purposes. An absolute ionization chamber was employed to measure N/sup 16/ activity in the reactor coolant. These measurements were compared with N/sup 16/ calculated from the (n,p) reaction on O/ sup 16/. (auth)

Gallagher, J.G.

1960-09-01T23:59:59.000Z

68

Hayden-Blue River 345-kV transmission line project, Colorado  

SciTech Connect

Tri-State Generation and Transmission Association, Inc., Colorado-Ute Electric Association, Inc., Platte River Power Authority, and Western Area Power Administration propose to construct and operate approximately 90 miles of 345-kilovolt (kV) transmission line between Hayden and the Blue River Valley in Colorado. The project would involve expansion of existing substation facilities at Hayden and construction of two new substations. The line would be operated at 230 kV initially. Estimated cost of the project is $37.8 million. The new line and substation facilities would provide a backup transmission path, satisfy the long-term needs in meeting the energy requirements, improve system reliability, improve system stability for the Craig and Hayden generating stations, and leave the existing 115-kV and 138-kV lines in operation to provide additional transmission capacity that would function as backup transmission during an outage on another line. Minute amounts of lands would be displaced. Construction activities would disturb critical ranges for elk and mule deer, elk calving areas, and the mating and nesting areas of greater sandhill cranes, great blue herons, sage grouse, golden eagles, and prairie falcons. Management of timberland would damage natural vegetation. The line would traverse 3.1 miles of flood-prone area, and as many as three transmission towers would lie within the floodplain of the Colorado River. The visual quality of land crossed by the line would be degraded somewhat.

Not Available

1982-09-01T23:59:59.000Z

69

Westinghouse Hanford Company operational environmental monitoring annual report - calendar year 1995  

SciTech Connect

This document summarizes the results of the Westinghouse Hanford Company (WHC) near-facility operational environmental monitoring for 1995 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air, surface water,groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

Schmidt, J.W., Westinghouse Hanford

1996-07-30T23:59:59.000Z

70

Westinghouse Hanford Company operational environmental monitoring annual report, calendar year 1994  

SciTech Connect

This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1994 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities are still seen on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

Schmidt, J.; Fassett, J.W.; Johnson, A.R.; Johnson, V.G.; Markes, B.M.; McKinney, S.M.; Moss, K.J.; Perkins, C.J.; Richterich, L.R.

1995-08-01T23:59:59.000Z

71

Umatilla Basin Fish Facilities Operation & Maintenance : Annual Report Fiscal Year 2008.  

DOE Green Energy (OSTI)

Westland Irrigation District, as contractor to Bonneville Power Administration, and West Extension Irrigation District, as subcontractor to Westland, provide labor, equipment, and material necessary for the operation, care, and maintenance of fish facilities on the Umatilla River. Westland Irrigation District is the contractor of record. Job sites that are covered: Three Mile Right, Three Mile Left, Three Mile Adult Spawning, WEID Sampling Facility, Maxwell Screen Site, Westland Screen Site/Ladder/Juvenile Sampling Facility, Feed Canal Ladder/Screen Site, Stanfield Ladder/Screen Site, Minthorn Holding Facility, Thornhollow Acclimation Site, Imeques Acclimation Site, Pendleton Acclimation Site, and South Fork Walla Walla Spawning Facility. O & M personnel coordinate with the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) personnel in performing tasks under this contract including scheduling of trap and haul, sampling, acclimation site maintenance, and other related activities as needed. The input from ODFW biologists Bill Duke and Ken Loffink, and CTUIR biologist Preston Bronson is indispensable to the success of the project, and is gratefully acknowledged. All tasks associated with the project were successfully completed during the fiscal year 2008 work period of October, 2007 through September, 2008. The project provides operations and maintenance throughout the year on five fish screen sites with a total of thirty-four rotating drum-screens, and four fish ladders in the Umatilla River Basin; additionally, periodic operations and maintenance is performed at holding, acclimation, and spawning sites in the Basin. Three people are employed full-time to perform these tasks. The FY08 budget for this project was $492,405 and actual expenditures were $490,267.01. Selected work activities and concerns: (1) Feed Dam Passage Improvement Project - A project to improve fish passage over the short term at the Feed Canal Diversion Dam site (Umatilla River mile 28.7) was implemented with local U.S. Bureau of Reclamation field office personnel coordinating project activities. Operation and Maintenance Project personnel assisted with labor, materials, and equipment to ensure the project was completed as planned. Discussions are under way to determine feasible alternatives for longer term solutions to passage issues at the site. (2) Three Mile Right (east bank) Facilities - The pump for supplying water to the fish handling facility holding pond was reconstructed successfully to achieve the desired increase in flow output necessary when increased quantities of fish are present. (3) Fish Screen Rehab at Stanfield Canal Diversion - Working with the Washington Department of Fish and Wildlife screen shop personnel, three rotating drum screens at the Stanfield Canal diversion site (Umatilla River mile 33.3) were serviced and overhauled with new bearings, seals, paint, and reinforcing bars. Work was completed, and screens reinstalled prior to water diversions beginning in the spring. (4) O & M personnel performed daily, weekly, and monthly operations and maintenance duties at the screen and ladder sites including, but not limited to, desilting of mud and debris, lubrication of mechanical parts, replacement of screen seals and screen motor components, adjustment of ladder gates, removal of large trees and woody debris deposited during high river flow conditions, servicing of pumps and screens for fish handling operations and sampling studies, in addition to general site clean-up, vegetative control, and security. Crew members responded as needed during evenings and after-hours according to weather conditions, river flows, and fish passage facility needs.

Wick, Mike

2008-12-30T23:59:59.000Z

72

DOE/KEURP site operator program. Year 3, Second Quarter Report, October 1--December 31, 1993  

Science Conference Proceedings (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU has purchased several electric cars and proposes to purchase additional electric vehicles. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has procured two (2) Soleq 1993 Ford EVcort station wagons. During calendar year 1994, the Kansas` electric vehicle program expects to purchase a minimum of four and a maximum of eleven additional electric vehicles. The G-Van was signed in order for the public to be aware that it was an electric vehicle. Financial participants` names have been stenciled on the back door of the van. The Soleq EvCorts have not been signed. In order to demonstrate the technology as feasible, the EvCorts were deliberately not signed. The goal is to generate a public perception that this vehicle is no different from any similar internal combustion engine vehicle. Magnetic signs have been made for special functions to ensure sponsor support is recognized and acknowledged.

Not Available

1993-12-31T23:59:59.000Z

73

Results of the first year of operation at Embalse Nuclear Power Station in Argentina  

SciTech Connect

As a part of the International Remote Monitoring Project, during March 1995, a Remote Monitoring System (RMS) was installed at the Embalse Nuclear Power Station in Embalse, Argentina. This system monitors the status of four typical Candu spent fuel dry storage silos. The monitoring equipment for each silo consists of analog sensors for temperature and gamma radiation measurement; digital sensors for motion detection; and electronic fiber-optic seals. The monitoring system for each silo is connected to a wireless Authenticate Item Monitoring System (AIMS). This paper describes the operation of the RMS during the first year of the trial and presents the results of the signals reported by the system compared with the on site inspections conducted by the regulatory bodies, ABACC, IAEA, ENREN. As an additional security feature, each sensor periodically transmits authenticated State-of-Health (SOH) messages. This feature provides assurance that all sensors are operational and have not been tampered with. The details of the transmitted information and the incidents of loss of SOH, referred to as Missing SOH Event, and the possible causes which produced the MSOHE are described. The RMS at the embalse facility uses gamma radiation detectors in a strong radiation field of spent fuel dry storage silos. The detectors are Geiger Muller tubes and Silicon solid state diodes. The study of the thermal drift of electronics in GM detectors and the possible radiation damage in silicon detectors is shown. Since the initial installation, the system has been successfully interrogated from Buenos Aires and Albuquerque. The experience gained, and the small changes made in the hardware in order to improve the performance of the system is presented.

Bonino, A.; Pizarro, L.; Higa, Z. [Ente Nacional Regulador Nuclear, Buenos Aires (Argentina); Dupree, S.A.; Schoeneman, J.L. [Sandia National Labs., Albuquerque, NM (United States)

1996-07-16T23:59:59.000Z

74

YEAR  

National Nuclear Security Administration (NNSA)

Male 2 Asian Female 1 Hispanic Male 3 Hispanic Female 6 White Male 50 White Female 11 DIVERSITY GENDER Workforce Diversity Associate Administrator for Emergency Operations (NA-40)...

75

One-Year Operational Measurements with a Sonic Anemometer–Thermometer and a Doppler Sodar  

Science Conference Proceedings (OSTI)

A Doppler sodar and an ultrasonic anemometer–thermometer, which are operated continuously at a nuclear research center in Germany, are described. Mean values and second moments including turbulent surface fluxes recorded over 1 yr are analyzed in ...

Gerhard Peters; Bernd Fischer; Hans Jürgen Kirtzel

1998-02-01T23:59:59.000Z

76

Two Years of Operational Comprehensive Hydrostatic Quality Control at the National Meteorological Center  

Science Conference Proceedings (OSTI)

A comprehensive hydrostatic quality control (CHQC) procedure for rawinsonde heights and temperatures was implemented into operational use at the National Meteorological Center (NMC) in December 1988. The CHQC uses a sophisticated decision-making ...

Lev S. Gandin; Lauren L. Morone; William G. Collins

1993-03-01T23:59:59.000Z

77

Model Output Statistics Forecasts: Three Years of Operational Experience in the Netherlands  

Science Conference Proceedings (OSTI)

In the Netherlands, one to five day Model Output Statistics (MOS) forecasts have been used operationally since November 1983. The weather elements predicted are the probability of precipitation, the conditional probability of frozen precipitation,...

C. Lemcke; S. Kruizinga

1988-05-01T23:59:59.000Z

78

Site operator program final report for fiscal years 1992 through 1996  

DOE Green Energy (OSTI)

The Site Operator Program was an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed at the Idaho National Engineering and Environmental Laboratory. The Program`s goals included the field evaluation of electric vehicles in real-world applications and environments; the support of electric vehicle technology advancement; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles. This report covers Program activities from 1992 to 1996. The Site Operator Program ended in September 1996, when it was superseded by the Field Operations Program. Electric vehicle testing included baseline performance testing, which was performed in conjunction with EV America. The baseline performance parameters included acceleration, braking, range, energy efficiency, and charging time. The Program collected fleet operations data on electric vehicles operated by the Program`s thirteen partners, comprising electric utilities, universities, and federal agencies. The Program`s partners had over 250 electric vehicles, from vehicle converters and original equipment manufacturers, in their operating fleets. Test results are available via the World Wide Web site at http://ev.inel.gov/sop.

Francfort, J.E. [Lockheed Martin Idaho Technologies Co., Idaho Falls, ID (United States). Idaho National Engineering and Environmental Lab.; Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Birasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

1998-01-01T23:59:59.000Z

79

YEAR  

National Nuclear Security Administration (NNSA)

1 1 YEAR 2011 Males 18 Females 23 YEAR 2011 SES 2 EJ/EK 2 NQ (Prof/Tech/Admin) 35 NU (Tech/Admin Support) 2 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 9 Asian Male 0 Asian Female 0 Hispanic Male 2 Hispanic Female 6 White Male 12 White Female 6 DIVERSITY Workforce Diversity Associate Administrator for Information Management & Chief Information Officer, NA-IM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 18 43.9% 23 56.1% Gender Males Females 4.9% 4.9% 85.4% 4.9% Pay Plan SES EJ/EK NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 2.4% 4.9% 7.3% 22.0% 0.0% 0.0% 4.9% 14.6% 29.3% 14.6% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

80

YEAR  

National Nuclear Security Administration (NNSA)

4 4 YEAR 2011 Males 21 Females 23 YEAR 2011 SES 3 EJ/EK 1 EN 03 1 NN (Engineering) 3 NQ (Prof/Tech/Admin) 31 NU (Tech/Admin Support) 5 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 2 Asian Male 1 Asian Female 1 Hispanic Male 6 Hispanic Female 10 White Male 13 White Female 10 DIVERSITY Workforce Diversity Office of General Counsel, NA-GC As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 21 47.7% 23 52.3% Gender Males Females 6.8% 2.3% 2.3% 6.8% 70.5% 11.4% Pay Plan SES EJ/EK EN 03 NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.0% 0.0% 2.3% 4.5% 2.3% 2.3% 13.6% 22.7% 29.5% 22.7% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

YEAR  

National Nuclear Security Administration (NNSA)

6 6 YEAR 2011 Males 7 Females 9 YEAR 2011 SES 1 NQ (Prof/Tech/Admin) 9 GS 15 2 GS 13 2 GS 12 1 GS 11 1 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 4 White Female 6 DIVERSITY Workforce Diversity Associate Administrator of External Affairs, NA-EA As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 7 43.8% 9 56.3% Gender Males Females 6.3% 56.3% 12.5% 12.5% 6.3% 6.3% Pay Plan SES NQ (Prof/Tech/Admin) GS 15 GS 13 GS 12 GS 11 0.0% 0.0% 6.3% 18.8% 6.3% 0.0% 6.3% 0.0% 25.0% 37.5% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male Hispanic Female White Male White Female FY11 Workforce Diversity

82

YEAR  

National Nuclear Security Administration (NNSA)

40 40 YEAR 2011 Males 68 Females 72 YEAR 2011 SES 5 EJ/EK 1 NN (Engineering) 16 NQ (Prof/Tech/Admin) 115 NU (Tech/Admin Support) 3 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 7 Asian Male 4 Asian Female 0 Hispanic Male 25 Hispanic Female 26 White Male 35 White Female 37 DIVERSITY Workforce Diversity Associate Administrator for Acquistion & Project Management, NA-APM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 68 48.6% 72 51.4% Gender Males Females 3.6% 0.7% 11.4% 82.1% 2.1% Pay Plan SES EJ/EK NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.7% 1.4% 2.1% 5.0% 2.9% 0.0% 17.9% 18.6% 25.0% 26.4% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male

83

Cable System Technology Review of XLPE EHV Cables: 220 kV to 500 kV  

Science Conference Proceedings (OSTI)

Utilities in North America are now evaluating the first long-length circuits of extruded cross-linked polyethylene (XLPE) cable systems containing many joints at rated voltages 220 kV, 230 kV, and 345 kV. Of interest is whether the design, manufacture, and installation of XLPE extra-high-voltage (EHV) cable systems has been sufficiently demonstrated to satisfy utilities that it can provide reliable service for their particular applications. This report reviews the worldwide state of the art, gives method...

2002-12-16T23:59:59.000Z

84

Federal Alternative Fuel Program Light Duty Vehicle Operations. Second annual report to Congress for fiscal year 1992  

DOE Green Energy (OSTI)

This annual report to Congress details the second year of the Federal light duty vehicle operations as required by Section 400AA(b)(1)(B) of the Energy Policy and Conservation Act as amended by the Alternative Motor Fuels Act of 1988, Public Law 100-494. In 1992, the Federal alternative fuel vehicle fleet expanded significantly, from the 65 M85 (85 percent methanol and 15 percent unleaded gasoline) vehicles acquired in 1991 to an anticipated total of 3,267 light duty vehicles. Operating data are being collected from slightly over 20 percent, or 666, of these vehicles. The 601 additional vehicles that were added to the data collection program in 1992 include 75 compressed natural gas Dodge full-size (8-passenger) vans, 25 E85 (85 percent denatured ethanol and 15 percent unleaded gasoline) Chevrolet Lumina sedans, 250 M85 Dodge Spirit sedans (planned to begin operation in fiscal year 1993), and 251 compressed natural gas Chevrolet C-20 pickup trucks. Figure ES-1 illustrates the locations where the Federal light duty alternative fuel vehicles that are participating in the data collection program are operating. The primary criteria for placement of vehicles will continue to include air quality attainment status and the availability of an alternative fuel infrastructure to support the vehicles. This report details the second year of the Federal light duty vehicle operations, from October 1991 through September 1992.

Not Available

1993-07-01T23:59:59.000Z

85

DOE/KEURP Site Operator Program. Year 2, Final report (fourth quarter), April--June 1993  

SciTech Connect

A second successful year has been completed of demonstrating and evaluating electric vehicle technology. The G-Van has begun to show signs of system failure (<10 miles/charge). The DSEP minivan remains idle. The Soleq vehicle performed well.

Hague, J.R.

1993-07-01T23:59:59.000Z

86

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

In accordance with DOE Order No. 202-05-03 Pepco is In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of Energy Emergency Orders Regarding Operation of the Potomac River Generating Station in Alexandria, Virginia

87

University of Washington Clinical Neutron Facility: Report on 26 Years of Operation  

Science Conference Proceedings (OSTI)

Particle radiotherapy facilities are highly capital intensive and must operate over decades to recoup the original investment. We describe the successful, long-term operation of a neutron radiotherapy center at the University of Washington, which has been operating continuously since September 1984. To date, 2836 patients have received neutron radiotherapy. The mission of the facility has also evolved to include the production of unique radioisotopes that cannot be made with the low-energy cyclotrons more commonly found in nuclear medicine departments. The facility is also used for neutron damage testing for industrial devices. In this paper, we describe the challenges of operating such a facility over an extended time period, including a planned maintenance and upgrade program serving diverse user groups, and summarize the major clinical results in terms of tumor control and normal tissue toxicity. Over time, the mix of patients being treated has shifted from common tumors such as prostate cancer, lung cancer, and squamous cell tumors of the head and neck to the rarer tumors such as salivary gland tumors and sarcomas due to the results of clinical trials. Current indications for neutron radiotherapy are described and neutron tolerance doses for a range of normal tissues presented.

Laramore, George E.; Emery, Robert; Reid, David; Banerian, Stefani; Kalet, Ira; Jacky, Jonathan; Risler, Ruedi [Department of Radiation Oncology, Box 356043 University of Washington Medical Center Seattle, WA 98195-6043 (United States)

2011-12-13T23:59:59.000Z

88

Years  

NLE Websites -- All DOE Office Websites (Extended Search)

and Technology in and Technology in the National Interest 60 Years of Excellence Lawrence Livermore National Laboratory FY 2012 Annual Report About the Cover: Lawrence Livermore National Laboratory (LLNL) engineers Chris Spadaccini (left) and Eric Duoss are shown experimenting with direct ink-writing to create micro- to macroscale structures with extreme precision. The Laboratory is advancing this process and other additive manufacturing technologies to develop new materials with extraordinary properties for use in a wide range of national-security and other applications. About the Laboratory: Lawrence Livermore National Laboratory was founded in 1952 to enhance the security of the United States by advancing nuclear weapons science and technology. With a talented and dedicated workforce and

89

Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1993  

Science Conference Proceedings (OSTI)

During fiscal year 1993, the reserves generated $440 million in revenues, a $33 million decrease from the fiscal year 1992 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $207 million, resulting in net cash flow of $233 million, compared with $273 million in fiscal year 1992. From 1976 through fiscal year 1993, the Naval Petroleum and Oil Shale Reserves generated $15.7 billion in revenues for the US Treasury, with expenses of $2.9 billion. The net revenues of $12.8 billion represent a return on costs of 441 percent. See figures 2, 3, and 4. In fiscal year 1993, production at the Naval Petroleum and Oil Shale Reserves at maximum efficient rates yielded 25 million barrels of crude oil, 123 billion cubic feet of natural gas, and 158 million gallons of natural gas liquids. The Naval Petroleum and Oil Shale Reserves has embarked on an effort to identify additional hydrocarbon resources on the reserves for future production. In 1993, in cooperation with the US Geological Survey, the Department initiated a project to assess the oil and gas potential of the program`s oil shale reserves, which remain largely unexplored. These reserves, which total a land area of more than 145,000 acres and are located in Colorado and Utah, are favorably situated in oil and gas producing regions and are likely to contain significant hydrocarbon deposits. Alternatively the producing assets may be sold or leased if that will produce the most value. This task will continue through the first quarter of fiscal year 1994.

Not Available

1993-12-31T23:59:59.000Z

90

Prison Industries Metering at the Texas Department of Criminal Justice: Two Years of Operational Experience  

E-Print Network (OSTI)

In 2001 the Texas Department of Criminal Justice Utilities and Energy Department (TDCJU& E) completed the installation of an extensive energy consumption metering system for their prison industries system. As the second largest state prison system in the nation, TDCJ facilities are scattered over many locations around the state and cover a diversity of prison industries and agricultural operations. The Energy Systems Laboratory (ESL), with New Horizon Technologies, Inc. (NHT) and eComponents Technology, Inc. installed a state-ofthe- art sub-metering system with the intent of meeting the needs of the TDCJ-U&E group well into the future. The system uses a web-based data acquisition interface and is capable of near real-time data acquisition and display. Fifteen-minute interval utility and sub-metered energy consumption data have been continuously collected since the system was commissioned. This paper describes the varied applications for these data at the TDCJ-U&E department. Significant improvements in the quality of energy use reporting and unit accountability have been obtained. Prison industries now receive monthly energy consumption reports and are responsible for the cost of their sub-metered energy consumption. Additionally, the operations and maintenance staff have found the data to be very useful for energy systems and equipment operational diagnosis.

Bryant, J.; McBride, J.; Merka, T.

2003-01-01T23:59:59.000Z

91

DOE/KEURP Site Operator Program year 5 first quarter report, July 1-- September 30, 1995  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy` s Electric Vehicle Site Operator Program. Through participation in this program, Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU now has two electric cars. Both are electric conversion vehicles from Soleq Corporation out of Chicago. KSU in conjunction with KEURP also initiated procurement for the purchase of four (4) Chevy S-10 pickup trucks. Since the supplier, GE-Spartan, canceled its effort concerning the production of vehicles other appropriate sources were sought. Today, K-State and the Kansas Utilities are working with Troy Design and Manufacturing (TDM), Redford, Michigan. TDM is working with Ford Motor Company and expects to become the first certified electric vehicle Quality Vehicle Modifier (QVM). Kansas State has entered into an agreement to assist TDM in supporting the infrastructure and technical manual development for these vehicles. The Soleq EVcorts have not been signed to illustrate to the public that it is an electric vehicle. Magnetic signs have been made for special functions to ensure sponsor support is recognized and acknowledged. As soon as TDM`s Ford Ranger electric vehicles are delivered they will be used throughout the state by utility companies that are participating with K-State`s Site Operator Program.

NONE

1995-12-01T23:59:59.000Z

92

Computing Division two-year operational plan, FY 1981-1982  

Science Conference Proceedings (OSTI)

This report is a comprehensive planning guide for the Computing Division of the Los Alamos National Laboratory for fiscal years 1981 and 1982. Subjects discussed include critical issues, programmatic requiements, hardware plans, software projects, direct user services, research projects, and projections of future developments.

Euald, R.H.; Worlton, W.J.; McCormick, M.

1981-02-01T23:59:59.000Z

93

Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability standards that minimize risks to public safety and to equipment. BPA is considering two construction alternatives, the Agency Proposed Action and the Alternative Action. The Alternative Action would include all the components of the Preferred Action except a double-circuit line would be constructed in the Spokane area between a point about 2 miles west of the Spokane River and Bell Substation, a distance of about 9 miles. BPA is also considering the No Action Alternative.

N /A

2002-08-09T23:59:59.000Z

94

The CERN Accelerator Logging Service- 10 Years in Operation: A Look at the Past, Present and Future  

E-Print Network (OSTI)

During the 10 years since it's first operational use, the scope and scale of the CERN Accelerator Logging Service (LS) has evolved significantly: from an LHC specific service expected to store 1TB / year; to a CERN-wide service spanning the complete accelerator complex (including related sub-systems and experiments) currently storing more than 50 TB / year on-line for some 1 million signals. Despite the massive increase over initial expectations the LS remains reliable, and highly usable - this can be attested to by the 5 million daily / average number of data extraction requests, from close to 1000 users. Although a highly successful service, demands on the LS are expected to increase significantly as CERN prepares LHC for running at top energy, which is likely to result in at least doubling current data volumes. Furthermore, focus is now shifting firmly towards a need to perform complex analysis on logged data, which in-turn presents new challenges. This paper reflects on 10 years as an operational service,...

Roderick, C; Kruk, G

2013-01-01T23:59:59.000Z

95

Results from the second year of operation of the Federal Methanol Fleet at Oak Ridge National Laboratory  

DOE Green Energy (OSTI)

The Oak Ridge National Laboratory has completed its second year of operation of ten vehicles for the Federal Methanol Fleet Project; five of the vehicles are fueled with methanol. Over 56,000 miles were accumulated on the vehicles in the second year bringing the total to over 152,000 miles. Energy consumption for the methanol cars was slightly higher than that of the gasoline cars again this year, most likely as a result of shorter average trip lengths for the methanol gas. Iron and lead have accumulated at greater rates in the lubricating oil of the methanol cars. Driver's ratings of vehicles reflected some dissatisfaction with the cold-weather performance of the methanol cars, but the cars have no special provisions for cold weather starting, and the fuel vapor pressure has not been tailored to the season as at other test sites. Otherwise, drivers' opinions of the methanol cars have been favorable. 13 refs., 4 figs., 10 tabs.

West, B.H.; McGill (Oak Ridge National Lab., TN (USA)); Hillis, S.L. (Tennessee Univ., Knoxville, TN (USA))

1990-09-01T23:59:59.000Z

96

Status of the Atlas Liquid Argon Calorimeter and its Performance after Three Years of LHC Operation  

E-Print Network (OSTI)

The ATLAS experiment is designed to study the proton-proton collisions pro- duced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo- rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.5-4.9. The electromagnetic calorimeters use lead as passive material and are characterised by an accordion geometry that allows a fast and uniform az- imuthal response without any gap. Copper and tungsten were chosen as pas- sive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical elec- trodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at approximately 89 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three-year period prior to first collisions in 2009, using cosmic ra...

Lampl, W; The ATLAS collaboration

2013-01-01T23:59:59.000Z

97

Status of the Atlas Liquid Argon Calorimeter and its Performance after Three Years of LHC Operation  

E-Print Network (OSTI)

The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo- rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.5-4.9. The electromagnetic calorimeters use lead as passive material and are characterized by an accordion geometry that allows a fast and uniform azimuthal response without any gap. Copper and tungsten were chosen as passive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical electrodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at approximately 89 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three-year period prior to first collisions in 2009, using cosmic rays and s...

Lampl, W; The ATLAS collaboration

2013-01-01T23:59:59.000Z

98

Status of the Atlas Liquid Argon Calorimeter and its Performance after two years of LHC operation  

E-Print Network (OSTI)

The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo-rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.4-4.9. The electromagnetic calorimeters use lead as passive material and are characterized by an accordion geometry that allows a fast and uniform azimuthal response without any gap. Copper and tungsten were chosen as passive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical electrodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at 87 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three years period prior to first collisions in 2009, using cosmic rays and single LHC beam...

AbouZeid, H; The ATLAS collaboration

2012-01-01T23:59:59.000Z

99

Status of the Atlas Liquid Argon Calorimeter and its Performance after three years of LHC operation  

E-Print Network (OSTI)

The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo-rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.4-4.9. The electromagnetic calorimeters use lead as passive material and are characterized by an accordion geometry that allows a fast and uniform azimuthal response without any gap. Copper and tungsten were chosen as passive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical electrodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at 87 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three years period prior to first collisions in 2009, using cosmic rays and single LHC beam...

De La Torre, H; The ATLAS collaboration

2013-01-01T23:59:59.000Z

100

Status of the ATLAS Liquid Argon Calorimeter; Performance after 2 years of LHC operation  

E-Print Network (OSTI)

The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo-rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.4-4.9. The electromagnetic calorimeters use lead as passive material and are characterized by an accordion geometry that allows a fast and uniform azimuthal response without any gap. Copper and tungsten were chosen as passive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical electrodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at about 87 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three years period prior to first collisions in 2009, using cosmic rays and single LH...

AbouZeid, H; The ATLAS collaboration

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

1200-kV future seen; automated distribution dangers  

SciTech Connect

A major problem facing the electric-utility industry concerns power-transmission corridors. The corridors serving the nation's power needs may not be available in sufficient numbers to meet growing electricity demand. The difficulty in locating new power corridors will necessitate the transmission of increased power along pathways already available. The possibility of open-transmission systems going to 1200 kV is being researched at Westinghouse Electric Corporation. While much of the technology for 1200-kV transmission is being demonstrated currently (such as transformers, puffer-breakers, lightning arrestors, and reactors), the public fear of low-level radiation and excessive noise may make construction of 1200-kV open substations near the load virtually impossible. The implications of not having sufficient load capability to meet demand concern Westinghouse officials. The possibility of involuntary power rationing could require social and political solutions instead of technical ones. (SAC)

1980-07-01T23:59:59.000Z

102

Naval petroleum and oil shale reserves: Annual report of operations, Fiscal Year 1986  

Science Conference Proceedings (OSTI)

Market prices for curde oil experienced their greatest decline in history during 1986, with substantial effect on the Naval Petroleum and Oil Shale Reserves. Sales procedures which had served the Department well in prior years during periods when oil prices were stable or rising were found inadequate to cope with these declines, and new sales procedures were developed and implemented. Congressional concern that the Government receive fair prices from Naval Petroleum Reserves (NPR) petroleum sales also led to Public Law No. 99-413, enacted on August 29, 1986, which amended title 10, United States Code, Chapter 641. This law sets a minimum price, using two criteria, under which petroleum from the NPR cannot be sold. Notwithstanding the decline in oil and gas prices, revenues from the sale of NPR petroleum totaled $763 million in 1986. Although this represented a 41% decline from 1985 receipts, the 1986 revenues well exceeded net program expenditures of $157 million. Because of the decline in prevailing oil prices during the second quarter of 1986, major cost reductions of $3.4 million were implemented at NPR-3, and even greater reductions are planned for 1987 to ensure the profitability of that field. The decline in energy prices also affected plans to protect natural gas underlying Naval Oil Shale Reserve No. 3 (NOSR-3). Two of 14 planned wells were drilled and are available for production. Unfortunately, efforts to sell gas from these wells have been unsuccessful, and further drilling has been delayed until the gas market is stronger. 16 figs., 20 tabs.

Not Available

1987-01-01T23:59:59.000Z

103

Experimental results from the first year of operation of the solar ground coupling research facility at Brookhaven National Laboratory  

DOE Green Energy (OSTI)

Results from the first year of operation of the solar ground coupling research facility at Brookhaven National Laboratory (BNL) are presented. Nine experiments which are first generation ground coupled heat transfer and storage devices for a solar source heat pump system have been operated since December 1978. A computer program called GROCS which models the heat transfer between these devices and the earth has been written (and subsequently integrated with the solar energy system simulation program TRNSYS by John W. Andrews). In this paper the ground coupling research program, the first generation experiments, and the underground heat flow model GROCS are described. Experimental results from December 1978 to September 1979 are presented and compared to model directions.

Meta, P D

1979-01-01T23:59:59.000Z

104

Analysis of a 1200 kV circuit breaker for a gas insulated substation. Final report  

Science Conference Proceedings (OSTI)

This report describes the work carried out to analyze and design a circuit for use in 1200 kV gas insulated substations. The first part of the project was devoted to a thorough analysis of the requirements for the circuit breaker from the standpoint of the electrical system in which it would operate. A conceptual design was selected and all of the components of the circuit breaker were designed, modeled and verified. Finally a plan was prepared for the construction of a complete circuit breaker.

Not Available

1985-01-01T23:59:59.000Z

105

Scale model simulates full-size substation electric fields. [For 345-kV system  

SciTech Connect

An innovative scale model of a 345-kV substation that can be energized to produce representative electric fields has been developed. The purpose of the model is to determine how changes in substation design and operation affect ground-level voltage gradients. Recent tests of the field strengths predicted by the model and actual voltage gradients at the full-size substation at 150 different pairs of points showed excellent agreement. For 94 percent of the pairs the model error was less than 10 percent. The statistical mean of the absolute values of the discrepancies for all 150 points was only 4.6 percent.

1977-04-01T23:59:59.000Z

106

Development of 77 kV 40 MVA gas-vapor cooled transformer  

SciTech Connect

A 77 KV 40 MVA gas-vapor cooled transformer has been developed as a prototype of substation transformers, which is directed to nonflammable and lightweight properties. To examine the operating reliability of the transformer, the reliability test has continued since July, 1981 at the Hokusetsu substation of KEPCO (Kansai Electric Power Co., Inc.). This report will cover the development work on thermal stability of materials, electrical fault test, insulation characteristics, cooling of model transformer, flow-induced static electrifiction, protection system and the prototype unit which is being built based upon these developments.

Tokoro, K.; Harumoto, Y.; Ina, T.; Kabayama, Y.; Sato, T.; Yamauchi, A.

1982-11-01T23:59:59.000Z

107

Proposed Four Corners-Ambrosia-Pajarito 500 kV transmission project. Draft environmental statement  

SciTech Connect

The Public Service Company of New Mexico proposes to construct and operate a 500 kV alternating current (ac) transmission line in the northwestern portion of New Mexico. The proposed line will extend from the Four Corners Power Plant to Ambrosia Station to a proposed Pajarito Station west of Albuquerque, NM. The proposed line will be approximately 173 miles in length. Construction of the 500 kV transmission line will adversely impact soils, vegetation, visual resources, and possibly in an indirect manner, the cultural resources in the area. These adverse impacts may be made minimal by the practice of erosion protection measures, revegetation, and a sound cultural resource management plan. There will be no appreciable impacts, adverse or otherwise in regard to surface or subsurface water by the construction or operation of the proposed transmission line. No adverse effects may be anticipated in regard to communities or social services. Economic impacts in the area will be short-term and should prove beneficial for the duration of the project. Construction and operation of this line will be beneficial in providing needed additional bulk transmission capacity between the Four Corners Plant and Albuquerque and bulk transmission support to the local western New Mexico area.

Not Available

1980-01-01T23:59:59.000Z

108

Proposed Four Corners-Ambrosia-Pajarito 500 kV transmission project. Final environmental statement  

SciTech Connect

The Public Service Company of New Mexico proposes to construct and operate a 500 kV alternating current (AC) transmission line in the northwestern portion of New Mexico. The proposed line will extend from the Four Corners Power Plant to Ambrosia Station to a proposed Pajarito Station west of Albuquerque, NM. The proposed line will be approximately 173 miles in length. Construction of the 500 kV transmission line will adversely impact soils, vegetation, visual resources, and possibly in an indirect manner, the cultural resources in the area. The adverse impacts may be made minimal by the practice of erosion protection measures, revegetation, and a sound cultural resource management plan. There will be no appreciable impacts, adverse or otherwise in regard to surface or subsurface water by the construction or operation of the proposed transmission line. No adverse effects may be anticipated in regard to communities or social services. Economic impacts in the area will be short-term and should prove beneficial for the duration of the project. Construction and operation of this line will be beneficial in providing needed additional bulk transmission capacity between the Four Corners Plant and Albuquerque and bulk transmission support to the local western New Mexico area.

Not Available

1980-01-01T23:59:59.000Z

109

EPRI Transmission Line Reference Book (Blue Book): 115-345 kV Compact Line Design  

Science Conference Proceedings (OSTI)

This report is an updated edition of the industry standard on overhead line compaction, the EPRI Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the Blue Book, which was last published in 1978. Publication of this new edition is the culmination of three years of research by a team of experts in the field. The report includes the latest information on research, technology, materials, and utility experience with compact lines. Note that this electronic report is being pu...

2007-12-13T23:59:59.000Z

110

Kansas State University electric vehicle site operator program. Year 1, second quarter report, October 1, 1991--December 30, 1991  

DOE Green Energy (OSTI)

K-State is presently working with Grumman Allied and Unique Mobility to establish a working agreement for the research and development of a pure electric postal vehicle. K-State has worked on the design of this vehicle for the past year and is working to establish the appropriate consortium to bring this vehicle to commercial realization. K-State is working to establish infrastructure support for electric vehicles. Presently, a Kansas company is working with K-State to bring its patented low-cost vehicle metering product to market. An anticipated second year DOE project would provide 100 electric metering stations to Southern California for a large scale electric vehicle infrastructure demonstration project. This project would allow a parking lot(s) to be made EV ready. K-State`s Site Operator Program continues to get the ``word-out`` about electric vehicles. From a personal visit by Senator Bob Dole, to Corporate Board of Director Meetings, to school classrooms, to shopping mall demonstrations; K-State Employees are increasing public access and awareness about the electric vehicle industry. As has been shown in this report, K-State`s G-Van has logged an average eighteen miles per day while maintaining a full schedule of public relations tours within the state of Kansas and Missouri. K-State has now been contacted by companies in Nebraska and Iowa requesting information and involvement in this program. Kansas and Kansas State will continue its work to contribute to the Site Operator Program effort. With the purchase of two additional electric vehicles and the pending request to purchase two more electric vehicles during the next contractual year, K-states`s program will grow. When vehicle development plans and infrastructure requirements are solidified, K-State`s program will be ready to participate and be a major contributor to the development and introduction of this technology.

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1991-12-31T23:59:59.000Z

111

Survey of Magnetic Fields Near BPA 230-kV and 500-kV Transmission Lines.  

Science Conference Proceedings (OSTI)

The purpose of this study was to characterize typical levels and variability of 60Hz magnetic fields at the centerline and edge of right-of-way of Bonneville Power Administration (BPA) 230-kV and 500-kV transmission lines. This was accomplished by taking magnetic field measurements at over 800 spans in Oregon and Washington. The spans were sampled using a stratified random sampling procedure with region (East vs. West), voltage (230-kV vs 500-kV), and circuit configuration as strata. There were five different circuit configuration groups for each region/voltage category requiring a total of 200 strata. Magnetic field measurements were taken at 13 locations under each span using an EMDEX-C as a survey meter. Additional information recorded for each span included conductor height (at 10 locations), right-of-way width, longitudinal and lateral slope, time of day, vegetation, terrain, weather conditions, temperature, wind speed, span length and presence of other lines in the corridor. 9 refs., 17 figs., 26 tabs.

Perrin, Nancy; Aggarwal, Rajinder Pal; Bracken, T. Daniel

1991-05-20T23:59:59.000Z

112

EIS-0450: TransWest Express 600 kV Direct Current Transmission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

50: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in...

113

ESS 2012 Peer Review - 15 kV Phase Leg Power Modules with SiC...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

at medium voltages * 13.8 kV and 4.16 kV are commonly used voltages * Silicon Carbide high voltage devices play a pivotal role at these voltages 6 Multilevel vs Two-Level...

114

Notification of Planned 230kV Outage at Potomac River Generating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to provide notification of any and all 230kV planned and unplanned outages at Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating...

115

EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties, Oregon EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties,...

116

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project...

117

ETM (Distribution Network Automation on 10 kV cable line stations...  

Open Energy Info (EERE)

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable...

118

Investigation of Geomagnetically Induced Currents in the Proposed Winnipeg-Duluth-Twin Cities 500-kV Transmission Line  

Science Conference Proceedings (OSTI)

The effects of geomagnetically induced currents (GIC) on a new 749-km, 500-kV ac transmission line were investigated. GIC effects on the operation of the line, equipment connected directly to the line, and power systems connected to the line were considered. The study concluded that GIC can have a substantial impact on equipment performance and on the power system. Potentially troublesome equipment and system conditions (both steady-state and transient) were identified.

1981-07-01T23:59:59.000Z

119

Field Demonstration of a 24-KV Warm Dielectric Cable at Detroit Edison: FY2001 Annual Progress Report  

Science Conference Proceedings (OSTI)

A project sponsored by EPRI, Pirelli Power Cables and Systems, the U.S. Department of Energy, Detroit Edison, and American Superconductor Corporation was initiated in 1998 to install and operate a 24 kV high-temperature superconducting (HTS) power cable in a Detroit Edison substation to serve customer load. The scope of this demonstration will result in the world's first underground installation of an HTS cable system using an existing duct network. Furthermore, the project involves installing the necess...

2002-02-12T23:59:59.000Z

120

Kansas State University Electric Vehicle Site Operator Program. Year 1: First quarter report, July 2, 1991--September 30, 1991  

SciTech Connect

During the past fifteen years Kansas State`s faculty has been involved in research of alternative fuel vehicles. From formulation of fuels and automotive fuel storage to development of electronic controls, K-State`s faculty research has been ongoing. With the increased awareness of what is occurring to the world`s environment, the catalyst -- to ensure applied results from faculty research will occur -- has been activated. The Department of Energy`s Electric Vehicle Site Operator Program is the platform being used to demonstrate international efforts to bring a more acceptable daily mode of transportation to our highways. The first new electrical vehicle procured at K-State in the last ten years, a G-Van, is a technological dinosaur. It does not incorporate leading edge control or drive systems nor does it provide the type of vehicle frame and body to meet a majority of the daily commuter needs required by the American market. Yet, this vehicle represents initial efforts to bring a federally crash certified vehicle to the commercial automotive market. As such, it is an evolutionary step in the mass production of electric vehicle products.

Hague, J.R.; Steinert, R.A.; Nissen-Pfrang, T.

1991-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

EPRI Transmission Line Reference Book: 115-345 kV Compact Line Design, The Blue Book  

Science Conference Proceedings (OSTI)

This report is an updated edition of the industry standard on overhead line compaction, the EPRI Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the "Blue Book," which was last published in 1978. Publication of this new edition is the culmination of three years of research by a team of experts in the field. The report includes the latest information on research, technology, materials, and utility experience with compact lines.

2008-11-05T23:59:59.000Z

122

Annual Summary Report Calendar Year 2000 for the 100-HR-3, 100-KR-4, and 100-NR-2 Operable Units and Pump-and-Treat Operations  

Science Conference Proceedings (OSTI)

This annual progress and performance evaluation report discusses the groundwater remedial actions in the 100 Area, including the interim actions at the 100-HR-3 and 100-KR-4 Operable Units, and also discusses the expedited response action in the 100-NR-2 operable unit.

G. B. Mitchem

2001-08-22T23:59:59.000Z

123

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska  

SciTech Connect

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

NONE

1995-05-01T23:59:59.000Z

124

Big Spring Wind Power Project First-Year Operating Experience: 1999-2000: U.S. Department of Energy-EPRI Wind Turbine Verification P rogram  

Science Conference Proceedings (OSTI)

The 34-MW Big Spring wind power plant is sited on elevated tabletop mesas near Big Spring, Texas. Under a power purchase agreement between the project owner and operator, York Research Corporation (York), and TXU Electric and Gas (TXU), York will supply wind energy to TXU for 15 years. This report describes Big Spring's first-year operating experience. The lessons learned in the project will be valuable to other utilities and wind power developers planning similar wind power projects, especially those lo...

2000-12-18T23:59:59.000Z

125

Review and evaluation of the Department of Energy's Research and Development Program for 1200-kV transmission and substation equipment  

SciTech Connect

In 1975 the US Department of Energy (DOE), Division of Electric Energy Systems (EES), initiated a program for the research and development (R and D) of 1200-kV transmission and substation equipment with a goal of developing the technology capable of three-phase power transfer of 10 GW. The program was oriented toward compact, compressed-gas-insulated (CGI) component design. The DOE/EES R and D program has encompassed all the major and essential transmission cable, substation apparatus, and specialized instrumentation for a 1200-kV system. It has included more than ten major multiyear research projects and has involved numerous research, development, manufacturing, and testing organizations. This report provides a review and evaluation of the overall DOE/EES 1200-kV R and D program. It includes detailed descriptions of the major projects, their objectives, component and system design direction, and current research status. Future R and D requirements are noted, and commercialization issues are briefly discussed. Research to date has not presented any insurmountable technical obstacles to 1200-kV CGI component design. Thus, although all of the component pieces are not yet available and all of the testing is not yet complete, 1200-kV CGI-based transmission and substation equipment appears to be technically feasible. Although the substation and transmission components under development in this program will not likely reach 1200-kV system commercialization for a number of years, many of the materials and design concepts that have been identified for 1200-kV service are readily applicable to devices rated at lower voltages.

Gnadt, P.A.; Walldorf, S.P.

1985-06-01T23:59:59.000Z

126

Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Pursuant to the United States Department of Energy Order No. 202-05-03, issued December 20, 2005 directing Mirant Potomac River to generate electricity at Potomac River Generating Station, PEPCO hereby files this Further Notice of 230kV Circuit Planned Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages More Documents & Publications Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Re: Potomac River Generating Station Department of Energy Case No.

127

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

128

Further Notice of 230kV Circuit Planned Outages | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Further Notice of 230kV Circuit Planned Outages Docket No. EO-05-01. Order No. 202-05-03: Pursuant 10 the United States Department of Energy "DOE") Order No. 102-05-3, issued December 20, 2005 ("DOE Potomac River Order''), Pepco hereby files this Further Notice Of 230kV Circuit Planned Outages serving the Potomac River Substation, and through thaI station, the District of Columbia. Further Notice of 230kV Circuit Planned Outages More Documents & Publications Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages Re: Potomac River Generating Station Department of Energy, Case No. EO-05-01: Potomac Electric Power Company (PEPCO) Concerning Planned Outages of the 230 kV circuits

129

Waste Area Group 10, Operable Unit 10-08, Annual Monitoring Status Report for Fiscal Year 2009  

Science Conference Proceedings (OSTI)

This report documents the status of Fiscal Year 2009 groundwater monitoring performed in Waste Area Group 10 at the U.S. Department of Energy Idaho National Laboratory Site, as identified in the Groundwater Monitoring and Field Sampling Plan for Operable Unit 10-08. Twelve of the fourteen required wells were sampled, and all ten required intervals from the Westbay wells were sampled. Two wells were not sampled because they were in the process of being converted into multiple-sample-interval Westbay wells by the U.S. Geological Survey. Groundwater samples were analyzed for volatile organic compounds identified on the Contract Laboratory Program target analyte list as well as metals (filtered), anions, and radionuclides (i.e., I-129, tritium, Tc-99, gross alpha, gross beta, and Sr-90). No contaminant exceeded maximum contaminant levels in wells along the southern boundary of the Idaho National Laboratory Site or in guard wells. Iron was above its secondary maximum contaminant level of 300 ug/L in one well. The cause of the elevated iron concentration is uncertain. Lead was detected just below its action level. However, the zinc concentration was also elevated in these wells, and the source of the lead is probably galvanized riser pipe in the wells. Once the galvanized pipe is replaced, both lead and zinc concentrations should decline, as has been observed at other Waste Area Group 10 wells.

Howard Forsythe

2010-02-04T23:59:59.000Z

130

Roseville Direct Service 230 kV Transmission Line Project, Sacramento and Placer Counties, California: Environmental assessment  

SciTech Connect

At present, the only transmission line serving the City of Roseville is operated by Pacific Gas and Electric Company (PG and E), which serves the City's Berry Street substation with a 60-kV circuit from the company's own Atlantic Street substation. Western pays wheeling charges to PG and E for use of their lines to deliver power to its customers which cannot be served directly. PG and E has informed Roseville that additional system facilities are required to meet the City's firm transmission requirements in excess of 69 megawatt peak. They proposed to build a new 230-kV line and transformer bank at a cost of $10.9 million which the City would have to pay, in addition to the wheeling charges Western would be charged to use the PG and E line. The City's preferred alternative is to have Western construct a direct 239-kV service from its Elverta substation to the Berry Street substation. This would save the city money in construction capital cost, result in more transmission capacity and eliminate the present wheeling costs charged to Western. Mitigation recommendations are included.

1986-06-01T23:59:59.000Z

131

Weld-Windsor 115-kV Transmission Line Project, Weld County, Colorado  

Science Conference Proceedings (OSTI)

The Western Area Power Administration is proposing to rebuild a 3.0 mile segment of the existing Flatiron-Weld 115-kV transmission line in Weld County. The line would be reconductored with new conductor on new wood pole double circuit structures. The new structures would support a double circuit transmission line configuration. The first circuit would be owned by Western and the second by Public Service Company of Colorado (PSCO). Alternatives considered included no action, constructing PSCO`s circuit on new right-of-way, and reconductoring Western`s existing line on the same structures. The proposed action was selected because it provided an opportunity to share structures with PSCO and, overall, would minimize costs and environmental impacts. The environmental assessment identifies minor effects on existing natural or human resources and minor benefits for agricultural operations.

NONE

1996-05-01T23:59:59.000Z

132

765kV Transmission line Voltage gradient  

E-Print Network (OSTI)

Corona ring Transmission lines Nowadays, due to the ever increasing energy consumption and power supply optimization, it is required to construct new power plants, substations and transmission lines. In Iran, also, because of increasing demand for electrical energy, for a significant power loss reduction in power transmission over long distances, and to construct high transmission lines that lead to reduction in the economic costs of transmission lines, the transmission lines must be considered at extra high voltage (EHV) levels. These EHV levels should be compared with the low voltage levels in order to extract the benefits. Therefore, in this paper, a review has been conducted on the types of 765 kV transmission lines used in different countries and a comparison between them and the low voltage levels have been performed. Accordingly, the advantages of EHV transmission lines are summarized. Finally, designing a line of 765 kV single-circuit with 6 conductors per bundle based on existing standards is presented.

unknown authors

2012-01-01T23:59:59.000Z

133

Design of the Atlas 240 kV Marx modules  

DOE Green Energy (OSTI)

A prototype 240 kV, oil-insulated Marx module has been designed and constructed at the Los Alamos National Laboratory (LANL). The prototype will be used for testing and certifying the design of the Marx module and certain components, including the closing switches, series resistor, and the capacitors themselves. The prototype will also be used to evaluate proposed mechanical systems designs. Information gained from the construction and testing of the 4-capacitor prototype will be folded into the design of the 16-capacitor maintenance unit. The prototype module consists of four 60 kV capacitors, two closing switches, one shunt resistor, and one series resistor. Cables are used to deliver the current to a dummy load scaled to match Atlas system parameters. The Marx unit is contained in a structure made from G-10, suspended from a steel frame that also serves to support components of the trigger, charging, and control system. Appropriate safety and charging systems are an integral part of the prototype design.

Bowman, D.W.; Bennett, G.; Biehl, F. [and others

1997-06-01T23:59:59.000Z

134

Final environmental assessment: Los Reales 115 kV transmission line alternative routes  

Science Conference Proceedings (OSTI)

The Central Arizona Project (CAP) was authorized as a part of the Colorado River Basin Project Act (Public Law 90-537) on September 30, 1968. The primary purpose of the CAP is to furnish water for agricultural, municipal, and industrial uses in central and southern Arizona, and western New Mexico. Due to its magnitude, the CAP is divided into several major features serving separate but interrelated functions. The Tucson Aqueduct Phase B pumping plants were designed and constructed to operate on a looped power system. The entire looped power system, including two switching stations and connecting 115-kv transmission lines, was identified in the FEIS and approved for construction in the Secretary of Interior's Record of Decision dated September 24, 1985. The loop begins in the vicinity of the Twin Peaks Pumping Plant -- the northernmost Phase B pumping station, at the Rattlesnake Switching Station. All of the looped power system has been constructed with the exception of the switching station and portion of transmission line proposed to be constructed in this project. Without construction of this final portion of the looped power system, the Phase B pumping plants will not be able to operate normally without negatively affecting nearby power sources. The CAP will also not be able to provide the reliability necessary for municipal water systems dependent upon CAP water. The purpose of this EA is to describe impacts that would result from relocating the Los Reales 115-kV transmission line, and possibly the switching station, originally identified in the FEIS. It should be mentioned the Department of Energy will complete a separate NEPA review.

Not Available

1989-10-01T23:59:59.000Z

135

Optimizing the CEBAF Injector for Beam Operation with a Higher Voltage Electron Gun  

Science Conference Proceedings (OSTI)

Recent developments in the DC gun technology used at CEBAF have allowed an increase in operational voltage from 100kV to 130kV. In the near future this will be extended further to 200kV with the purchase of a new power supply. The injector components and layout at this time have been designed specifically for 100kV operation. It is anticipated that with an increase in gun voltage and optimization of the layout and components for 200kV operation, that the electron bunch length and beam brightness can be improved upon. This paper explores some upgrade possibilities for a 200kV gun CEBAF injector through beam dynamic simulations.

F.E. Hannon, A.S. Hofler, R. Kazimi

2011-03-01T23:59:59.000Z

136

Geomagnetically Induced Current Estimation in the Wisconsin 345-kV Power Grid  

Science Conference Proceedings (OSTI)

This technical update presents the results from a project to assess space weather effects on the Wisconsin 345-kV power transmission grid.

2008-08-21T23:59:59.000Z

137

Ten Years of Compressed Natural Gas (CNG) Operations at SunLine Transit Agency: April 2003--December 2004  

Science Conference Proceedings (OSTI)

This report focuses on the lesson learned at the SunLine Transit Agency after it converted in 1994 its entire operating transit bus fleet to compressed natural gas (CNG).

Chandler, K.

2006-01-01T23:59:59.000Z

138

The Meteorological Model BOLAM at the National Observatory of Athens: Assessment of Two-Year Operational Use  

Science Conference Proceedings (OSTI)

Since November 1999, the hydrostatic meteorological Bologna Limited-Area Model (BOLAM) has been running operationally at the National Observatory of Athens. The assessment of the model forecast skill during the 2-yr period included (a) ...

K. Lagouvardos; V. Kotroni; A. Koussis; H. Feidas; A. Buzzi; P. Malguzzi

2003-11-01T23:59:59.000Z

139

Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Annual Status Report for Fiscal Year 2006  

SciTech Connect

This report provides a status of the progress made in Fiscal Year 2006 on tasks identified in the Waste Area Group 10, Operable Unit 10-08, Remedial Investigation/Feasibility Study Work Plan. Major accomplishments include: (1) groundwater sampling and review of the groundwater monitoring data, (2) installation of a Sitewide groundwater-level monitoring network, (3) update of the Groundwater Monitoring and Field Sampling Plan of Operable Unit 10-08, (4) re-evaluation of the risk at Site TSF-08, (5) progress on the Operable Unit 10-08 Sitewide Groundwater Model.

R. P. Wells

2007-05-09T23:59:59.000Z

140

The results of systems tests of the 500 kV busbar controllable shunting reactor in the Tavricheskaya substation  

Science Conference Proceedings (OSTI)

The results of systems tests of the 500 kV busbar magnetization-controllable shunting reactor (CSR), set up in the Tavricheskaya substation, including measurements of the quality of the electric power, the harmonic composition of the network currents of the reactor for different values of the reactive power consumed, the determination of the regulating characteristics of the reactor, the speed of response of the shunting reactor in the current and voltage stabilization modes, and also the operation of the reactor under dynamic conditions for different perturbations, are presented. The results obtained are analyzed.

Gusev, S. I. [JSC 'FSK EES' (Russian Federation); Karpov, V. N.; Kiselev, A. N.; Kochkin, V. I. [Scientific-Research Institute of Electric Power Engineering (VNIIE) - Branch of the JSC 'NTTs Elektroenergetiki', (Russian Federation)

2009-09-15T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Green Mountain Power Wind Power Project Third-Year Operating Experience: 1999-2000: U.S. Department of Energy-EPRI Wind Turbine Veri fication Program  

Science Conference Proceedings (OSTI)

The 6.05-MW Green Mountain Power (GMP) wind power project is located on top of a wooded ridge in the Green Mountains of southern Vermont near the town of Searsburg. This report describes the third-year operating experience at the GMP wind project. The lessons learned in the project will be valuable to other utilities planning similar wind power projects.

2000-12-07T23:59:59.000Z

142

Kotzebue Electric Association Wind Power Project Third-Year Operating Experience: 2001-2002: U.S. Department of Energy - EPRI Wind T urbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the third-year operating experience and expansion of the 0.76-MW Kotzebue Electric Association (KEA) wind power project near Kotzebue, Alaska. The lessons learned in the project will be valuable to other utilities planning similar wind power projects.

2002-12-13T23:59:59.000Z

143

Kotzebue Electric Association Wind Power Project Second-Year Operating Experience: 2000-2001: U.S. Department of Energy-EPRI Wind Tu rbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the second-year operating experience at the 0.66-MW Kotzebue Electric Association (KEA) wind power project near Kotzebue, Alaska. Lessons learned in the project will be valuable to other utilities planning similar wind power projects.

2001-11-30T23:59:59.000Z

144

Wisconsin Low Wind Speed Turbine Project Third-Year Operating Experience: 2000-2001: U.S. Department of Energy - EPRI Wind Turbine V erification Program  

Science Conference Proceedings (OSTI)

This report describes the third-year operating experience at the 1.2-MW Low Wind Speed Turbine Project (LWSTP) in Glenmore, Wisconsin. The lessons learned in the project will be valuable to other utilities planning similar wind power projects.

2001-12-06T23:59:59.000Z

145

Kotzebue Electric Association Wind Power Project Fourth-Year Operating Experience: 2002-2003: U.S. Department of Energy - EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the fourth-year operating experience and expansion of the 0.76 MW Kotzebue Electric Association (KEA) wind power project near Kotzebue, Alaska. The lessons learned in the project will be valuable to other utilities planning similar wind power projects.

2003-12-15T23:59:59.000Z

146

Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report for July through September 1994 (Fourth quarter of fiscal year 1994)  

DOE Green Energy (OSTI)

The Site Operator Program was initially established by the Department of Energy (DOE) to incorporate the electric vehicle activities dictated by the Electric and Hybrid Vehicle Research, Development and Demonstration Act of 1976. In the ensuing years, the Program has evolved in response to new legislation and interests. The Program currently includes twelve sites located in diverse geographic, metrologic, and metropolitan areas across the US. Information is shared reciprocally with a thirteenth site, not under Program contract. The vehicles are operator-owned, except for two Griffon vans. The Mission Statement of the Site Operator Program includes three major activities: advancement of electric vehicle technologies; development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of electric vehicles (EVs) by the public. The current participants in the Site Operator Program are shown. The ultimate thrust of program activities varies among sites, reflecting not only the Operator`s business interests but also geographic and climate-related operating conditions. This fourth quarter report (FY-94) includes a summary of activities from the previous three quarters. The report section sequence has been revised to provide a more easily seen program overview, and specific operator activities are now found in Appendix A.

Kiser, D.M.; Brown, H.L.

1995-03-01T23:59:59.000Z

147

Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas  

SciTech Connect

Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

1992-04-01T23:59:59.000Z

148

Fiscal Year 2009 Annual Report for Operable Unit 3-14, Tank Farm Soil and INTEC Groundwater  

SciTech Connect

This annual report summarizes maintenance, monitoring, and inspection activities performed to implement the selected remedy for Waste Area Group 3, Operable Unit 3-14, Tank Farm soil and groundwater at the Idaho Nuclear Technology and Engineering Center located within the Idaho National Laboratory Site. Results from monitoring perched water and groundwater at the Idaho Nuclear Technology and Engineering Center are also presented.

Forsythe, Howard S.

2010-04-10T23:59:59.000Z

149

First year's operation experience of the deepest SPM (Single Point Mooring) in the world  

SciTech Connect

The British National Oil Corp. had a Single Anchor Leg Mooring (SALM) installed at the Thistle Field in Apr. 1977 for export loading of tankers pending completion of the Brent System 36 in. pipeline to Sullom-Voe, which became operational in Dec. 1978; the SALM will continue to be maintained in good condition as a standby alternative export outlet. Modification of the original three 80,000 dwt tankers during 1977 provided the original design capacity of an 80,000 dwt tanker, but with added clean ballast capacity to eliminate tank cleaning and treatment of dirty ballast water. A fully integrated tanker/SALM/platform instrumentation system monitors mooring loads, buoy and riser angles, and tanker status; the latter being radio telemetered to the nearby block platform. Operation of the system and necessary modifications are described.

Millar, J.L.; Hughes, H.; Dyer, R.C.

1979-01-01T23:59:59.000Z

150

Notification of Planned 230kV Outage at Potomac River Generating Station |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Notification of Planned 230kV Outage at Potomac River Generating Notification of Planned 230kV Outage at Potomac River Generating Station Notification of Planned 230kV Outage at Potomac River Generating Station Docket No. EO-05-01. In accordance with DOE Order No. 202-05-03 Pepco is required to provide notification of any and all 230kV planned outages at Potomac River Generating Station. On Tuesday February 20, 2007 Potomac Electric Power Company (Pepco) will be taking a planned outage on the 23106 high voltage circuit between the Palmer's Corner Substation and the Potomac River Generating Station. Notification of Planned 230kV Outage at Potomac River Generating Station More Documents & Publications Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Special Environmental Analysis For Actions Taken under U.S. Department of

151

Kansas State University: DOE/KEURP Site Operator Program. Year 4, fourth quarterly report, April 1, 1995--June 30, 1995  

SciTech Connect

Kansas State University, in support of a DOE and Kansas Electric Utilities Research Program subject contract, continues to test, evaluate, demonstrate, and develop electric vehicle and infrastructure technology. K-State is operating two Soleq EVcort vehicles. During this reporting period both vehicles were brought back to full operational status after warranty service was completed by Soleq. Vehicle failures occurred due to three unrelated battery cable failures in addition to the replacement of one battery. Both vehicles are being operated on a routine basis. K-State, along with York Technical College, has established a relationship with Troy Design and Manufacturing (TDM) Redford, Michigan. K-State has ordered no less than four Ford Ranger electric trucks from TDM. K-State is involved in the steering committee that is monitoring and refining information to direct the design and testing of these new technology vehicles. TDM should become the first automotive manufacturer certified by one of the Big Three under their Quality Vehicle Manufacturer program. Kansas State University and the Kansas Electric Utility Research Program look forward to working with TDM on their new EV program.

1995-08-01T23:59:59.000Z

152

Five-year summary and evaluation of operations and performance of the Utica aquifer and North Lake Basin Wetlands restoration project in 2004-2009.  

SciTech Connect

This document reviews the performance of the groundwater (and wetlands) restoration program implemented by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the first five years (2004-2009) of this initiative. The report summarizes treatment system operational data and regulatory compliance monitoring results for the site during this period, together with the results of the targeted groundwater sampling and analysis for volatile organic compounds (VOCs) conducted in early 2010 (following completion of the fifth year of systems operation), to assess the initial five years of progress of the Utica remediation effort. On the basis of the 2003 groundwater sampling results, a remedial system employing 4 extraction wells (GWEX1-GWEX4), with groundwater treatment by spray irrigation and conventional air stripping, was implemented with the concurrence of the CCC/USDA and the agencies (Table 1.1). The principal components of the system are shown in Figure 1.3 and are briefly described in Section 1.2. Operation of well GWEX4 and the associated air stripper began on October 29, 2004, and routine operation of wells GWEX1-GWEX3 and the spray irrigation treatment units began on November 22, 2004.

LaFreniere, L. M. (Environmental Science Division)

2011-09-13T23:59:59.000Z

153

First-Year Operation of a New Water Vapor Raman Lidar at the JPL Table Mountain Facility, California  

Science Conference Proceedings (OSTI)

A new water vapor Raman lidar was recently built at the Table Mountain Facility (TMF) of the Jet Propulsion Laboratory (JPL) in California and more than a year of routine 2-h-long nighttime measurements 4–5 times per week have been completed. The ...

Thierry Leblanc; I. Stuart McDermid; Robin A. Aspey

2008-08-01T23:59:59.000Z

154

Iowa / Nebraska Distributed Wind Generation Projects First and Second-Year Operating Experience: 1999-2001: U.S. Department of Energ y - EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

The Wind Turbine Verification Program (TVP) is a collaborative effort of the U.S. Department of Energy (DOE), EPRI, and host utilities to develop, construct, and operate wind power plants. This report describes the first- and second-year operating experience at the 2.25-MW Iowa Distributed Wind Generation Project (IDWGP) in Algona, Iowa, and the 1.5-MW Nebraska Distributed Wind Generation Project (NDWGP) in Springview, Nebraska. The lessons learned in both projects will be valuable to other utilities pla...

2001-12-03T23:59:59.000Z

155

Evaluation of Suspected Steady-State Magnetic Induction by a 345-kV Double-Circuit Transmission Line onto Railroad Track  

Science Conference Proceedings (OSTI)

CenterPoint Energy operates a double circuit 345-kV transmission line north of Houston that parallels the Burlington Northern Santa Fe Railroad (BNSF) for approximately 15 miles. The railroad is experiencing elevated steady-state 60-Hz voltage in the parallel exposure. AC voltages and currents in railroad track can come from many sources. And, railroad systems can withstand reasonable amounts of this electromagnetic interference (EMI) without problems. When problems with EMI on a railroad do appear, it i...

2008-11-12T23:59:59.000Z

156

Low voltage operation of plasma focus  

SciTech Connect

Plasma foci of compact sizes and operating with low energies (from tens of joules to few hundred joules) have found application in recent years and have attracted plasma-physics scientists and engineers for research in this direction. We are presenting a low energy and miniature plasma focus which operates from a capacitor bank of 8.4 {mu}F capacity, charged at 4.2-4.3 kV and delivering approximately 52 kA peak current at approximately 60 nH calculated circuit inductance. The total circuit inductance includes the plasma focus inductance. The reported plasma focus operates at the lowest voltage among all reported plasma foci so far. Moreover the cost of capacitor bank used for plasma focus is nearly 20 U.S. dollars making it very cheap. At low voltage operation of plasma focus, the initial breakdown mechanism becomes important for operation of plasma focus. The quartz glass tube is used as insulator and breakdown initiation is done on its surface. The total energy of the plasma focus is approximately 75 J. The plasma focus system is made compact and the switching of capacitor bank energy is done by manual operating switch. The focus is operated with hydrogen and deuterium filled at 1-2 mbar.

Shukla, Rohit; Sharma, S. K.; Banerjee, P.; Das, R.; Deb, P.; Prabahar, T.; Das, B. K.; Adhikary, B.; Shyam, A. [Energetics and Electromagnetics Division, Facility for Electromagnetic Systems, Bhabha Atomic Research Center, Visakhapatanam, A.P. 530012 (India)

2010-08-15T23:59:59.000Z

157

Hardware Development of a Laboratory-Scale Microgrid Phase 1--Single Inverter in Island Mode Operation: Base Year Report, December 2000 -- November 2001  

SciTech Connect

This report summarizes the activities of the first year of a three-year project to develop control software for micro-source distributed generation systems. The focus of this phase was on internal energy storage requirements, the modification of an off-the-shelf motor drive system inverter to supply utility-grade ac power, and a single inverter system operating in island mode. The report provides a methodology for determining battery energy storage requirements, a method for converting a motor drive inverter into a utility-grade inverter, and typical characteristics and test results of using such an inverter in a complex load environment.

Venkataramanan, G.; Illindala, M. S.; Houle, C.; Lasseter, R. H.

2002-11-01T23:59:59.000Z

158

Report on Matters Identified at the Richland Operations Office During the Audit of the Department's Consolidated Fiscal Year 1996 Financial Statements, WR-FS-97-04  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPORT ON MATTERS IDENTIFIED AT THE RICHLAND OPERATIONS OFFICE DURING THE AUDIT OF THE DEPARTMENT S CONSOLIDATED FISCAL YEAR 1996 FINANCIAL STATEMENTS The Office of Inspector General wants to make the distribution of its audit reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov

159

Big Spring Wind Power Project Third- Through Fifth-Year Operating Experience: 2001-2004: U.S. Department of Energy-EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the third-, fourth-, and fifth-year operating experience at the 34-MW Big Spring Wind Power Plant near Big Spring, Texas. The project consists of 42 Vestas V47 wind turbines installed on 65-m (213-ft) towers and four Vestas V66 wind turbines installed on 80-m (262-ft) towers. Lessons learned in the project will be valuable to other utilities and wind power developers planning similar wind power projects.

2004-10-25T23:59:59.000Z

160

Big Spring Wind Power Project Second-Year Operating Experience: 2000-2001: U.S. Department of Energy - EPRI Wind Turbine Verificatio n Program  

Science Conference Proceedings (OSTI)

This report describes second-year operating experience at the 34 MW Big Spring Wind Power Plant near Big Spring, Texas. The project consists of 42 Vestas V47 wind turbines installed on 65-meter (213-foot) towers and 4 Vestas V66 wind turbines installed on 80-meter (262-foot) towers. The lessons learned in the project will be valuable to other utilities and wind power developers planning similar wind power projects.

2001-12-06T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Kotzebue Electric Association Wind Power Project First-Year Operating Experience: 1999-2000: U.S. Department of Energy - EPRI Wind T urbine Verification Program  

Science Conference Proceedings (OSTI)

Although much of western Alaska has abundant wind resources, wind energy technology has not been widely deployed in the state, and utilities rely primarily on diesel fuel for energy generation. Kotzebue Electric Association is pioneering the application of wind energy technology in combination with the existing diesel generation in the remote communities in Northwest Alaska. This report describes the first-year operating experience at the 0.66-MW Kotzebue Electric Association (KEA) wind power project nea...

2000-12-13T23:59:59.000Z

162

Wisconsin Low Wind Speed Turbine Project First- and Second-Year Operating Experience: 1998-2000: U.S. Department of Energy-EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

The 1.2 MW Low Wind Speed Turbine Project (LWSTP) -- installed in Glenmore, Wisconsin, in early 1998 -- was the first commercial-scale wind project in Wisconsin. This report describes the first- and second-year operating experience at the LWSTP. The lessons learned in the project will be valuable to other utilities planning similar wind power projects, particularly in cold-weather, moderate wind resource areas.

2000-12-15T23:59:59.000Z

163

Tennessee Valley Authority Eagle Bend 161-kV delivery point environmental assessment  

Science Conference Proceedings (OSTI)

Eagle Bend is an area located in a bend of the Clinch River about one mile southeast of Clinton, Tennessee, in Anderson County. This area, including an industrial park, is supplied electric power by the Clinton Utilities Board (UB) through its 69-kV system, which is in turn supplied by TVA over a 69-kV transmission line from Norris Hydro Plant. Studies of the power supply in the area indicate that there will likely be significant load growth both in the Clinton area in general and the industrial park in particular. Studies further show that if this new load is supplied at 69-kV, the TVA transformer at Norris Hydro which supplies this load will be overloaded by the summer of 1993 and no feasible alternate source which would maintain the quality and reliability of the power delivered to the Clinton system exists to accept this load. Clinton UB also needs to transfer load from its Clinton substation in the same time period to prevent overloading. Additional studies and consultation between TVA and Clinton UB have indicated that the best solution to this problem is to supply this load at 161-kV at a new delivery point for Clinton UB. This would require the construction of a new 161/13-kV substation by Clinton UB and the construction by TVA of a new 161-kV transmission line to connect this substation to the existing TVA 161-kV transmission system.

Not Available

1993-02-05T23:59:59.000Z

164

Continuous Energy Management of the HVAC&R System in an Office Building System Operation and Energy Consumption for the Eight Years after Building Completion  

E-Print Network (OSTI)

The authors continuously studied the energy consumption of a heating, ventilating, air- conditioning and refrigerating (HVAC&R) system in an office for the operation of the system in terms of its expected performance. A fault in the system control setting was detected, and the system performance improved significantly as a result of correcting the fault. Recently, however, problematic issues, such as the malfunction of chillers and deteriorated performance of the heat exchangers, have emerged, resulting in the degradation of overall system performance. This paper describes (a) changes in the energy consumption of the building over a period of eight years during which the HVAC&R system was operated, and (b) problematic issues that arose during system operation in order to identify the energy-saving effects of the system found when energy management of the building is continuously practiced. In this HVAC&R system, about 25% of electric power consumption for wintertime could be saved by checking the system operation during the first two years. After that, the electric power consumption gradually increased due to the system deterioration until 2004, but it decreased again by properly dealing with the problems.

Akashi, Y.; Shinozaki, M.; Kusuda, R.; Ito, S.

2006-01-01T23:59:59.000Z

165

HVDC converter stations for voltages above 600 kV: R and D needs and priorities: Final report  

Science Conference Proceedings (OSTI)

A study of the R and D needed to build converter stations for HVDC transmission lines with pole-to-ground voltages between 800 and 1200 kV confirmed that economical designs for more than 800 kV will require long-term R and D. Converter stations for 800 kV appear possible with existing technology.

Krishnayya, P.C.S.; Maruvada, P.S.; Lambeth, P.J.; Desilets, G.; Trinh, N.G.

1986-12-01T23:59:59.000Z

166

Kansas State University DOE/KEURP Site Operator Program. Year 3, Third quarter report, January 1, 1994--March 31, 1994  

Science Conference Proceedings (OSTI)

Formed on July 15, 1981, the goal of this program is to undertake applied research and development projects that may enhance reliability and minimize the cost of electric service in Kansas. The Kansas Electric Utilities Research Program (KEURP) is a contractual joint venture between six major electric utilities that serve the residents of the State of Kansas. The establishment of KEURP was made possible by the Kansas Corporation Commission (KCC). The KCC allowed Kansas electric utilities to include research and development (R & D) costs in their operating expenses, including dues to the Electric Power Research Institute (EPRI). Kansas universities play a unique role in KEURP with representation on the executive, technical and advisory committees of the program. The universities receive significant direct and indirect support from KEURP through direct funded projects as well as KEURP/EPRI co-funded projects. KEURP is working with EPRI researchers on projects to develop or expand Kansans knowledge and expertise in the fields of high technology and economic development. KEURP is a major source of funding in the electric/hybrid vehicle demonstration program.

Hague, J.R.

1994-05-01T23:59:59.000Z

167

Performance of the ATLAS Liquid Argon Calorimeter after three years of LHC operation and plans for a future upgrade  

E-Print Network (OSTI)

The ATLAS experiment is designed to study the proton-proton collisions produced at the Large Hadron Collider(LHC) at CERN. Liquid argon sampling calorimeters are used for all electromagnetic calorimetry covering the pseudo-rapidity region up to 3.2, as well as for hadronic calorimetry in the range 1.4-4.9. The electromagnetic calorimeters use lead as passive material and are characterized by an accordion geometry that allows a fast and uniform azimuthal response without any gap. Copper and tungsten were chosen as passive material for the hadronic calorimetry; whereas a classic plate geometry was adopted at large polar angles, an innovative one based on cylindrical electrodes with thin argon gaps was designed for the coverage at low angles, where the particles flow is higher. All detectors are housed in three cryostats kept at 87 K. After installation in 2004-2006, the calorimeters were extensively commissioned over the three years period prior to first collisions in 2009, using cosmic rays and single LHC beam...

Nikiforou, N; The ATLAS collaboration

2013-01-01T23:59:59.000Z

168

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA has taken in its OM R programs, a utility comparison team was assembled in early January 1989. The team included representatives from BPA's Management Analysis, Internal Audit and Financial Management organizations, and operation and maintenance program areas. BPA selected four utilities from a field of more than 250 electric utilities in the US and Canada. The selection criteria generally pertained to size, with key factors including transformation capacity, load, gross revenue, and interstate transmission and/or marketing agreements, and their OM R programs. Information was gathered during meetings with managers and technical experts representing the four utilities. Subsequent exchanges of information also took place to verify findings. The comparison focused on: Transmission operations and maintenance program direction and emphasis; Organization, management and implementation techniques; Reliability; and Program costs. 2 figs., 21 tabs.

United States. Bonneville Power Administration.

1990-09-01T23:59:59.000Z

169

Wood substation design beats out steel. [Conversion of 115-kV to 230 kV substations at Carolina Power and Light Co  

SciTech Connect

Construction plans for voltage conversion of substations can lead to new designs that are economical, reduce outage times, and result in minimum impacts on the environment. In fact, these factors prompted Carolina Power and Light Co. to make one such design its construction standard. Cost of converting a 115-kV distribution source substation to 230 kV is 20 percent less than that of replacing it with one of steel design. And because the conversion creates negligible environmental impact, getting government approval for the project is not a major problem. Steel is relegated to special situations.

Thompson, C.M.

1976-09-15T23:59:59.000Z

170

Plans for 735 kV substation. Towers revealed: Manicouagan-Outardes system  

SciTech Connect

A review of papers presented at the Toronto IEEE meeting is presented. Details of the substation design for the Manicouagan-Outardes 735 kV system are given.

Archambeau, J.; Cardella, O.; D' Auteuil, L.; Fournier, R.P.; McGillis, D.T.; Monty, G.

1963-07-15T23:59:59.000Z

171

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

172

Solid-State Fault Current Limiter Development : Design and Testing Update of a 15kV SSCL Power Stack  

Science Conference Proceedings (OSTI)

ABSTRACT The Solid-State Fault Current Limiter (SSCL) is a promising technology that can be applied to utility power delivery systems to address the problem of increasing fault currents associated with load growth. As demand continues to grow, more power is added to utility system either by increasing generator capacity or by adding distributed generators, resulting in higher available fault currents, often beyond the capabilities of the present infrastructure. The SSCL is power-electronics based equipment designed to work with the present utility system to address this problem. The SSCL monitors the line current and dynamically inserts additional impedance into the line in the event of a fault being detected. The SSCL is based on a modular design and can be configured for 5kV through 69kV systems at nominal current ratings of 1000A to 4000A. Results and Findings This report provides the final test results on the development of 15kV class SSCL single phase power stack. The scope of work included the design of the modular standard building block sub-assemblies, the design and manufacture of the power stack and the testing of the power stack for the key functional tests of continuous current capability and fault current limiting action. Challenges and Objectives Solid-State Current Limiter technology impacts a wide spectrum of utility engineering and operating personnel. It addresses the problems associated with load growth both at Transmission and Distribution class networks. The design concept is pioneering in terms of developing the most efficient and compact power electronics equipment for utility use. The initial test results of the standard building blocks are promising. The independent laboratory tests of the power stack are promising. However the complete 3 phase system needs rigorous testing for performance and reliability. Applications, Values, and Use The SSCL is an intelligent power-electronics device which is modular in design and can provide current limiting or current interrupting capabilities. It can be applied to variety of applications from distribution class to transmission class power delivery grids and networks. It can also be applied to single major commercial and industrial loads and distributed generator supplies. The active switching of devices can be further utilized for protection of substation transformers. The stress on the system can be reduced substantially improving the life of the power system. It minimizes the voltage sag by speedy elimination of heavy fault currents and promises to be an important element of the utility power system. DOE Perspective This development effort is now focused on a 15kV system. This project will help mitigate the challenges of increasing available fault current. DOE has made a major contribution in providing a cost effective SSCL designed to integrate seamlessly into the Transmission and Distribution networks of today and the future. Approach SSCL development program for a 69kV SSCL was initiated which included the use of the Super GTO advanced semiconductor device which won the 2007 R&D100 Award. In the beginning, steps were identified to accomplish the economically viable design of a 69kV class Solid State Current Limiter that is extremely reliable, cost effective, and compact enough to be applied in urban transmission. The prime thrust in design and development was to encompass the 1000A and the 3000A ratings and provide a modular design to cover the wide range of applications. The focus of the project was then shifted to a 15kV class SSCL. The specifications for the 15kV power stack are reviewed. The design changes integrated into the 15kV power stack are discussed. In this Technical Update the complete project is summarized followed by a detailed test report. The power stack independent high voltage laboratory test requirements and results are presented. Keywords Solid State Current Limiter, SSCL, Fault Current Limiter, Fault Current Controller, Power electronics controller, Intelligent power-electronics Device, IED

Dr. Ram Adapa; Mr. Dante Piccone

2012-04-30T23:59:59.000Z

173

The Operational Experience of the Triple-GEM Detectors of the LHCb Muon System: Summary of 2 Years of Data Taking  

E-Print Network (OSTI)

The LHCb muon system consists of more than a thousand gas detectors, mostly MWPC, located in five different stations. The Muon detector is used to define the muon trigger and to identify muons at the high-level triger and at the recontruction stage. The first station of the muon detector, located in front of the calorimetric system, is made of 274 chambers. The 12 most irradiated chambers, the ones closer to the beam pipe, are double triple-GEM detectors with pad readout. These detectors have an active area of 200x240 mm$^2$ and are routinely operated at rates close to 300 kHz/cm$^2$. With the gas mixture used (Ar/CO$_2$/CF$_4$ at 45/15/40) these detectors have the requested efficiency (>96% in a 20 ns time window for the logical OR of the two sensitive gaps) when operated at gains of about 2300. In this presentation we will report on the performance of these 24 triple-GEM detectors after more than 2 years of operation in the harsh LHCb conditions. We will also show some problems occurred during data taking, ...

Cardini, Alessandro; De Simone, Patrizia

2012-01-01T23:59:59.000Z

174

Marys Lake 69/115-kV transmission line upgrade and substation expansion projects  

SciTech Connect

Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

NONE

1996-05-01T23:59:59.000Z

175

SNS LINAC MODULATOR OPERATIONAL HISTORY AND PERFOMANCE  

Science Conference Proceedings (OSTI)

Fourteen High Voltage Converter Modulators (HVCM) were initially installed at the Spallation Neutron Source Linear Accelerator (SNS Linac) at the Oak Ridge National Laboratory in 2005. A fifteenth HVCM was added in 2009. Each modulator provides a pulse of up to 140 kV at a maximum width of 1.35 msec. Peak power level is 11 MW with an 8% duty factor. The HVCM system must be available for neutron production (NP) 24/7 with the exception being two, 6-week maintenance periods per year. HVCM reliability is one of the most important factors to maximize Linac availability and achieve SNS performance goals. During the last few years several modifications have been implemented to improve the overall system reliability. This paper presents operational history of the HVCM systems and examines failure mode statistical data since the modulators began operating at 60 Hz. System enhancements and upgrades aimed at providing long term reliable operation with minimal down time are also discussed in the paper.

Peplov, Vladimir V [ORNL; Anderson, David E [ORNL; Cutler, Roy I [ORNL; Hicks, Jim [ORNL; Saethre, Robert B [ORNL; Wezensky, Mark W [ORNL

2011-01-01T23:59:59.000Z

176

Microsoft Word - CX-Alvey 500 kV Fencing_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2010 3, 2010 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Hamid Habibi Project Manager - TESF-CSB Proposed Action: Replace existing posts and fencing around Alvey Substation 500-kV switch yard. PP&A Project No.: 1 632 Budget Information: Work Order: 00250208 Task: 3 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.11 Installation of fencing, including that for border marking that will not adversely affect wildlife movements or surface water flow. Location: The proposed project is located in Lane County, Oregon at the Bonneville Power Administration (BPA) Alvey substation around the 500-kV switch yard. Proposed by: BPA Description of the Proposed Action: The project involves replacement of the existing fence and fence posts for the 500-kV yard at the

177

220 kV SSSC device for power flow control (Smart Grid Project) | Open  

Open Energy Info (EERE)

kV SSSC device for power flow control (Smart Grid Project) kV SSSC device for power flow control (Smart Grid Project) Jump to: navigation, search Project Name 220 kV SSSC device for power flow control Country Spain Headquarters Location Catalonia, Spain Coordinates 41.59116°, 1.520862° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":41.59116,"lon":1.520862,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

178

EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: TransWest Express 600 kV Direct Current Transmission 0: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada EIS-0450: TransWest Express 600 kV Direct Current Transmission Project in Wyoming, Colorado, Utah, and Nevada Summary This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Bureau of Land Management (Wyoming State Office), evaluates the environmental impacts of granting a right-of-way for the TransWest Express 600-kilovolt Direct Current Transmission Project and amending a land use plan. The project consists of an overhead transmission line that would extend approximately 725 miles from south-central Wyoming, through Colorado and Utah. Western proposes to be a joint owner of the project. Public Comment Opportunities

179

0.4 kV remote control (Smart Grid Project) | Open Energy Information  

Open Energy Info (EERE)

4 kV remote control (Smart Grid Project) 4 kV remote control (Smart Grid Project) Jump to: navigation, search Project Name 0.4 kV remote control Country Denmark Coordinates 56.26392°, 9.501785° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":56.26392,"lon":9.501785,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

180

Operator Manual  

Science Conference Proceedings (OSTI)

... Pressing the 'Defaults' button will restore the default choice of X-ray lines ... These defaults are based on an accelerating voltage of 20kV and a 20keV ...

2013-01-18T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

TVA's 500-kV electric and magnetic fields: measurements and analyses  

Science Conference Proceedings (OSTI)

This report summarizes the results of the 500-kV electric and magnetic fields data project, performed by the Electrical Systems Group of the Tennessee Valley Authority (TVA). The objectives of the project were to measure, record, and analyze electric and magnetic fields in the vicintiy of TVA's 500-kV transmission lines. Also the effects of transmission line fields on the growth and development of selected agricultural and forest plant species were to be investigated. This report contains only the categorization and the statistical analysis of the fields data.

Not Available

1983-09-01T23:59:59.000Z

182

Insulation and radio influence dictate design of 650 kV substation  

SciTech Connect

The 650 kV North Substation of Project EHV is marked by three unusual features which differentiate it from the more familiar 230 and 345 kV substations. First, the sheer size of the apparatus, structures, and busses is striking. Second, is the amount of insulation. As represented by insulators and bushings it is proportionally much larger in lower voltage substations. Third, is the absence of sharp protrusions or angles anywhere in the substation, even on the roof of the house where corona loss is measured. Shielding is evident everywhere in the circles or ovals of smooth aluminum tubing.

Abetti, P.A.

1961-03-27T23:59:59.000Z

183

Present and future applications for 34. 5-kV vacuum switchgear  

SciTech Connect

Vacuum technology applied to circuit breakers for 34.5-kV metal-clad switchgear offers significant advantages over equipment of previous design. Substation size, a major consideration to the 34.5-kV distribution system designer, is further reduced when vacuum equipment is specified. Vacuum equipment versatility is evidenced by the growing number of substation circuit configurations being implemented. Improved interruption capabilities, longer life and reduced maintenance are features offered by vacuum. These many features assure vacuum equipment a prominent position in future substation designs in this voltage class.

Sullivan, P.

1975-01-01T23:59:59.000Z

184

Defective insulators in live working on a 550kV compact steel lattice tower  

Science Conference Proceedings (OSTI)

Research was conducted to determine the minimum number of healthy insulator units needed to ensure worker safety in live working on a compact 550 kV steel lattice tower. A large variety of worksite conditions was investigated. Test results confirm the conservative nature of the CIGRE formula for defective insulator units, and modifications to the formula are suggested. The recommended number of healthy units is 12 in a string of 24 units for the case of live work on the compact 550 kV tower, when the Portable Protective Gap (PPG) is used. Adjustment for altitude should be made above 900 m (3,000 ft).

Gela, G. [EPRI Power Delivery Center, Lenox, MA (United States); Kientz, H. [Western Area Power Administration, Golden, CO (United States); Fox, H.J. Jr. [Public Service Electric and Gas, Bridgewater, NJ (United States); Mitchell, J.D. [Alabama Power Co., Birmingham, AL (United States); Lyons, P.F. [EPRI, Haslet, TX (United States)

1997-04-01T23:59:59.000Z

185

Eight percent cost penalty for world's first 765-kV SF/sub 6/ substation may be bargain  

SciTech Connect

A Lynchburg, Virginia 765 kV sulfur hexafluoride substation cost a premium of 8% over conventional substations in order to meet environmental requirements, but the first 18 months of operation required no maintenance costs and a design flexibility that meant less land and no landscaping was required. Some of the added front-end cost should be assigned to research and development for this prototype installation. A review of the siting and design specifications cites a number of environmental as well as economic advantages of low-profile, gas-insulated substations. 7 figures, 1 table. (DCK)

Laskowski, L.M.

1981-08-01T23:59:59.000Z

186

Proposed amendment for Presidential Permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada Northern States Power Company. Final Environmental Assessment  

SciTech Connect

Northern States Power Company, (NSP), a Minnesota investor owned utility has applied to the Office of Fossil Energy, United States Department of Energy, to amend Presidential Permit PP-63 to allow for alterations to the 500 kV transmission line and as sedated facilities currently regulated by this permit. The alterations proposed for the 500 kV line owned by NSP are part of a long term effort sponsored by NSP to upgrade the existing NSP transmission system to allow for increased exchange of electricity with the Manitoba Hydro-Electric Board. Presidential Permit PP-63 authorized NSP to construct, connect, operate and maintain a 500 kV line at the United States/Canadian border approximately seven-and-a-half miles west of Warroad in Roseau County, Minnesota. This line connects with a 500 kV line owned and operated by the Manitoba Hydro-Electric Board (MHEB), which extends from Dorsey, Manitoba, Canada to the United States/Canadian border. NSP proposes to increase the electricity transfer capability of this transmission facility by constructing a new 80-acre substation on the existing 500 kV line in Roseau County, Minnesota, and upgrading the existing substation at Forbes, Minnesota. The proposed Roseau substation would contain two 41.5 ohm series capacitor banks. In addition, static VAR compensators are to be installed at the existing Forbes Substation. Approximately 5 acres would be added to the 30-acre Forbes site to house the additional equipment. No new lines would enter or exit the facility. NSP proposes to place the new Roseau Substation in service in May 1993 and to complete the upgrading of the Forbes Substation in March 1994. The primary, initial purpose of these modifications is to enable NSP to import 400 megawatts of electric power from MHEB during the summer months to meet peak electrical demand in the Minneapolis-St. Paul area. It is expected that this power transfer would begin in 1993.

Not Available

1992-02-01T23:59:59.000Z

187

The 4 times 6 network; Upgrade of a major 500kV substation  

SciTech Connect

This paper describes a study to enhance the reliability of BC Hydro's Ingledow 500 kV substation. It employs truth tables and frequency and duration analysis. The study included double-breaker double-bus and 4 {times} 6 arrangements, and 4 {times} 6 was recommended for its cost and reliability advantages.

Page, R.; Nishikawara, K.; Stromotich, F. (Substation Planning Associates, Inc., West Vancouver (CA))

1991-04-01T23:59:59.000Z

188

Special design and testing aspects of the 345 kV East Fishkill substation  

SciTech Connect

The installation of two 135 MVAR capacitor banks in the 345 kV East Fishkill substation required special design of the grounding system, installation of reactors in series with the capacitor banks, closing resistors in the circuit breakers and special shielding of control cables. This paper describes the design of the substation and the tests performed before commissioning the capacitor banks.

Fogarty, R.P.; Halleran, T.M.; Laskowski, L.M.; Mark, D.A. (Consolidated Edison Co. of New York, Inc., New York, NY (United States))

1992-10-01T23:59:59.000Z

189

BLID sensor evaluation at a 500-kV substation: an interim report  

SciTech Connect

A joint Sandia Laboratories-Bonneville Power Administration (BPA) evaluation of a buried-line intrusion detection (BLID) sensor is being performed at a 500-kV switching substation. Measurements of the electrical environment and the effects of the environment on the sensor are described.

1979-05-01T23:59:59.000Z

190

Perimeter sensor evaluation at a 500-kV substation. Interim report  

SciTech Connect

A joint Sandia Laboratories-Bonneville Power Administration (BPA) evaluation of exterior perimeter intrusion sensors is being performed at a 500-kV switching substation. Measurements of the electrical environment and the effects of the environment on the sensors are described.

Griffith, R.D.

1978-08-01T23:59:59.000Z

191

Critical Needs for Distribution System Operations  

Science Conference Proceedings (OSTI)

The electric power distribution system (voltages up to 35 kV) is the most extensive network. While the operation of this system is of great importance from the reliability and safety point of view, managing this network varies among utilities from cases where modern distribution management systems are utilized to cases of minimal central operational capability. Distribution Management Systems (DMS) provide real time information to DSOs for the continuous moment by moment (24 hours a day, 7 days a week) o...

2005-12-20T23:59:59.000Z

192

Electric and Hybrid Vehicle Program, Site Operator Program. Quarterly progress report, October--December 1995 (first quarter of fiscal year 1996)  

DOE Green Energy (OSTI)

This is the Site Operator Program quarterly report for USDOE electric and hybrid vehicle research. Its mission now includes the three major activity categories of advancement of electric vehicle (EV) technologies, development of infrastructure elements needed to support significant EV use and increasing public awareness and acceptance of EVs. The 11 Site Operator Program participants, their geographic locations, and the principal thrusts of their efforts are identified. The EV inventories of the site operators totals about 250 vehicles. The individual fleets are summarized.

Francfort, J.E. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

1996-03-01T23:59:59.000Z

193

El Paso electric 345 kV, Springerville to Deming, transmission line project, New Mexico  

SciTech Connect

Construction of a 213.5-mile, 345-kilovolt (kV) transmission line is proposed from the El Paso Electric Company Luna substation, 1.5 miles north of Deming, to a point on the existing Tucson Electric Power Company transmission line near Red Hill, in New Mexico. Counties in New Mexico that could be directly affected are Luna, Sierra, Socorro, Catron, and Grant. The proposed line would use wood towers, 51 to 55 feet high, placed at an average interval of 800 feet. More equipment would be added to the Luna substation, consisting of a 345-kV circuit breaker, two switches, a dead-end tower, and relay equipment. Communication and control would be provided through a microwave radio system. The transmission line would be paralleled by a two-track road for routine patrol. Estimated cost of the project is $42.9 million.

Not Available

1985-07-01T23:59:59.000Z

194

Design and Overview of 100 kV Bushing for the DNB Injector of ITER  

Science Conference Proceedings (OSTI)

The 100 kV bushing is one of the most important and technologically challenging Safety Important Class (SIC) components of the Diagnostic Neutral Beam (DNB) injector of ITER. It forms interface between gas insulated electrical transmission line and torus primary vacuum and acts as a vacuum feedthrough of ITER. Design optimization has been carried out to meet the electric and structural requirements based on its classification. Unlike HNB bushing, single stage bushing is designed to provide 100 kV isolation. Finite Element Analysis (FEA) based optimization has been carried out for electrostatic and structural analysis. Manufacturing assembly sequence is studied and presented in this paper. However validation of the same is foreseen from manufacturer.

Shah, Sejal; Bandyopadhyay, M.; Rotti, C.; Singh, M. J.; Roopesh, G.; Chakraborty, A. K. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Rajesh, S. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Microelectronics and Materials Physics Labs, P.O.Box 4500, FIN-90014 University of Oulu (Finland); Nishad, S.; Srusti, B. [DesignTech Systems Ltd, Banjara Hills, Hyderabad, Andhra Pradesh-500034 (India); Schunke, B.; Hemsworth, R.; Chareyre, J.; Svensson, L. [ITER Organisation, Route de Vinon, CS 90 046, 13067 St. Paul lez Durance Cedex (France)

2011-09-26T23:59:59.000Z

195

Year Four, 104th Congress, 3rd quarter report, January 1, 1995--March 31, 1995. DOE/KEURP Site Operator Program  

Science Conference Proceedings (OSTI)

Kansas State University is participating in the Department of Energy`s Electric Vehicle Site Operator Program. Kansas State is displaying, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations an opportunity to examine the latest EHV prototypes under actual operating conditions.

NONE

1995-06-01T23:59:59.000Z

196

Solid-State Fault Current Limiter Development: Design of a 15.5-kV Field-Ready Unit  

Science Conference Proceedings (OSTI)

The solid-state current limiter (SSCL) is power-electronics-based equipment designed to work with the present utility system. The SSCL monitors the line current and dynamically inserts additional impedance into the line if a fault is detected. The SSCL is based on a modular design and can be configured for 5-kV through 69-kV systems at nominal current ratings of 1000A–4000A.In this report, a complete design is presented for 15.5-kV, 1200A and 4000A, single-phase and three-phase ...

2013-02-14T23:59:59.000Z

197

15KV Class 25KVA Single-Phase IUT Prototype Development, Testing, and Performance Verification  

Science Conference Proceedings (OSTI)

EPRI is leading the development and demonstration of fully integrated, production-grade 4-kV and 15-kV-class solid-state transformers for integrating energy storage technologies and electric vehicle (EV) fast charging. The development team includes utilities, power electronics experts, and a transformer manufacturer to provide guidance on taking the technologies from concept to production. The intelligent universal transformer (IUT) technology has been validated through development and lab testing, ...

2013-12-12T23:59:59.000Z

198

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart  

Open Energy Info (EERE)

ETM (Distribution Network Automation on 10 kV cable line stations) (Smart ETM (Distribution Network Automation on 10 kV cable line stations) (Smart Grid Project) Jump to: navigation, search Project Name ETM (Distribution Network Automation on 10 kV cable line stations) Country Hungary Headquarters Location Budapest, Hungary Coordinates 47.498405°, 19.040758° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.498405,"lon":19.040758,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

199

KvH Projekt GmbH Co KG | Open Energy Information  

Open Energy Info (EERE)

KvH Projekt GmbH Co KG KvH Projekt GmbH Co KG Jump to: navigation, search Name KvH Projekt GmbH & Co KG Place Hamburg, Germany Zip D-20259 Sector Biomass, Solar, Wind energy Product Project developer in wind, solar, biomass and smart architecture. Coordinates 53.553345°, 9.992455° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":53.553345,"lon":9.992455,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

200

ARM - NSA Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Images Information for Guest Scientists Contacts NSA Operations Barrow Facility Instrumentation at the Barrow facility operates 7 days a week, 24 hours a day, year around. The...

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Operation, modification, and maintenance of DOE/PETC 700 H. P. combustion test facility. Yearly activity report, April 3, 1978--April 1, 1979  

SciTech Connect

The operation, modifications and maintenance of the DOE/PETC 700 H.P. combustion test facility are described. Shakedown and operation limit tests were performed with No. 6 fuel oil and 30% COM. The tests involved flame studies, erosion, corrosion and the examination of boiler deposits. Various construction, modification and maintenance efforts are detailed. The original 100 H.P. test facility was scrapped after 3 months operation under this contract and construction of a new 100-20 H.P. test facility begun. (LTN)

1978-01-01T23:59:59.000Z

202

EA-1891: Alvey-Fairview 230-kV Transmission Line Rebuild Lane, Douglas and Coos Counties, Oregon  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of a proposal to rebuild DOE’s Bonneville Power Administration’s Alvey-Fairview No. 1 230-kV transmission line located between Eugene, Oregon, and Coquille, Oregon.

203

Electric and hybrid vehicle program; Site Operator Program. Quarterly progress report, January--March 1992 (Second quarter of fiscal year 1992)  

DOE Green Energy (OSTI)

Activities during the second quarter included the second meeting of the Site Operators in Phoenix, AZ in late April. The meeting was held in conjunction with the Solar and Electric 500 Race activities. Delivery of vehicles ordered previously has begun, although two of the operators are experiencing some delays in receiving their vehicles. Public demonstration activities continue, with an apparent increasing level of awareness and interest being displayed by the public. Initial problems with the Site Operator Database have been corrected and revised copies of the program have been supplied to the Program participants. Operating and Maintenance data is being supplied and submitted to INEL on a monthly basis. Interest in the Site Operator Program is being reflected in requests for information from several organizations from across the country, representing a wide diversity of interests. These organizations have been referred to existing Site Operators with the explanation that the program will not be adding new participants, but that most of the existing organizations are willing to work with other groups. The exception to this was the addition of Potomac Electric Power Company (PEPCO) to the program. PEPCO has been awarded a subcontract to operate and maintain the DOE owned G-Van and Escort located in Washington, DC. They will provide data on these vehicles, as well as a Solectria Force which PEPCO has purchased. The Task Force intends to be actively involved in the infrastructure development in a wide range of areas. These include, among others, personnel development, safety, charging, and servicing. Work continues in these areas. York Technical College (YORK) has completed the draft outline for the EV Technician course. This is being circulated to organizations around the country for comments. Kansas State University (KSU) is working with a private sector company to develop a energy dispensing meter for opportunity charging in public areas.

Warren, J.F.

1992-05-01T23:59:59.000Z

204

Electric and hybrid vehicle program, site operator program quarterly progress report for April through June 1996 (third quarter of fiscal year 1996)  

DOE Green Energy (OSTI)

The US Department of Energy (DOE) Site Operator Program was initially established to meet the requirements of the Electric and Hybrid Vehicle Research, Development, and Demonstration Act of 1976. The Program has since evolved in response to new legislation and interests. The goals of the Site Operator Program include the field evaluation of electric vehicles (EVs) in real-world applications and environments; the advancement of electric vehicle technologies; the development of infrastructure elements necessary to support significant electric vehicle use; and increasing the awareness and acceptance of EVs by the public. The Site Operator Program currently consists of eleven participants under contract and two other organizations that have data-sharing agreements with the Program (Table ES-1). Several national organizations have joined DOE to further the introduction and awareness of electric vehicles, including: (1) EVAmerica (a utility program) and DOE conduct performance and evaluation tests to support market development for electric vehicles; and (2) DOE, the Department of Transportation, the Electric Transportation Coalition, and the Electric Vehicle Association of the Americas are conducting a series of workshops to encourage urban groups in Clean Cities (a DOE program) to initiate the policies and infrastructure development necessary to support large-scale demonstrations, and ultimately the mass market use, of electric vehicles. The current focus of the Program is the collection and dissemination of EV operations and performance data to aid in the evaluation of real-world EV use. This report contains several sections with vehicle evaluation as a focus.

Francfort, J. [Lockheed Idaho Technologies Co., Idaho Falls, ID (United States); Bassett, R.R. [Sandia National Labs., Albuquerque, NM (United States); Briasco, S. [Los Angeles Dept. of Water and Power, CA (United States)] [and others

1997-01-01T23:59:59.000Z

205

Kansas State University DOE/KEURP Site Operator User Task Force. Year 3, Fourth quarterly report, April 1--June 30, 1994  

DOE Green Energy (OSTI)

This program relates to demonstration use of electric-powered vehicles. KSU has two electric cars (conversion vehicles) from Soleq. Corp., and is purchasing 4 Chevy trucks for conversion. This document discusses the participating groups, program plan, events, vehicles and components, operations, and procurement.

Hague, J.

1994-06-28T23:59:59.000Z

206

Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska  

SciTech Connect

This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

1991-06-01T23:59:59.000Z

207

Use the drop-down search menus and operators (AND, OR, NOT) to customize your search. Search by topic, author, journal title, publication year, and other fields.  

E-Print Network (OSTI)

by topic, author, journal title, publication year, and other fields. Topic Enter your search words, joined, and subject terms; choose Title from the drop-down search menu to restrict your search to document titles only for the most comprehensive search. 1.To find all articles by Francis Harry Compton Crick, click , enter Crick F

California at Berkeley, University of

208

Exposure to transmission line electric fields during farming operations  

Science Conference Proceedings (OSTI)

This paper describes an analysis of exposure to transmission line electric fields during typical farming operations. This analysis makes use of experimentally determined ''activity factors'' and time budget information for typical farms as compiled by the U.S. Department of Agriculture. A detailed exposure assessment for 18 ''typical farms'' (as defined by USDA) is provided for a base case 345 kV design. Exposure estimates for transmission lines ranging from 115-765 kV are provided for a representative farm.

Silva, M.; Huber, D.

1985-09-01T23:59:59.000Z

209

Curecanti-Blue Mesa-Salida 115-kV transmission lines access roads rehabilitation, maintenance, and construction project. Environmental Assessment  

SciTech Connect

Western Area Power Administration (Western) is a power marketing agency of the US Department of Energy, with jurisdiction in 15 western states. The Salt Lake City Area (SLCA) of Western performs the agency`s mission in parts of Colorado, New Mexico, Texas, Utah, Arizona, Wyoming, and Nevada. As part of its mission, Western owns, operates, and maintains a system of transmission lines for transmitting bulk electrical energy from points of generation to and between delivery points. Part of that system in southwestern Colorado includes the Blue Mesa-Curecanti and Blue Mesa-Salida 115-kV transmission lines. Western proposes to conduct maintenance and improve its access roads for these two transmission lines. This paper discusses the impacts to the existing environment as well as the environmental consequences resulting from the maintenance and construction that is proposed.

Not Available

1993-07-01T23:59:59.000Z

210

ESS 2012 Peer Review - 15 kV Phase Leg Power Modules with SiC Devices - Ranbir Singh, GeneSiC Semiconductor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Click to edit Master title style 15 kV Phase Leg Power Modules with SiC MIDSJT Devices Ranbir Singh and Siddarth Sundaresan GeneSiC Semiconductor Inc. ranbir.singh@genesicsemi.com +1 703 996 8200 43670 Trade Center Pl #155; Dulles VA 20166 September 27, 2012 Acknowledgement: The authors thank Dr. Imre Gyuk for funding this work and Dr. Stan Atcitty for technical supervision Sandia National Laboratories is a multi- program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. DOE SBIR HV DC Link Grant #SC0008240 2 Phase Leg forms fundamental building block for AC/DC AND DC/AC Conversion

211

Single-transformer substation for 500 kV and over  

SciTech Connect

At extra high voltage substations which must meet high reliability requirements, in particular, two autotransformer groups are often installed almost simultaneously independent of the load. As a result, significant capital investment is frozen for long periods, and scarce electrical equipment is utilized inefficiently. Thus, in a number of cases the construction of substations with a single group of single-phase autotransformers is desirable. In this case, on failure of one autotransformer phase the time of subnormal energy output due to disconnection of the substation may reach several hours. The efficiency of extra high voltage substations may be improved significantly by using a proposed circuit for connection of a group of single-phase transformers with a single reserve phase, permitting installation of one group of single-phase transformers at a substation without impairment of reliability. The installation, performance and cost of this transformer arrangement are discussed. It is concluded that the use of single-transformer 500 kV substations with the proposed circuit as distribution substations would, on the one hand, provide sufficient reliability for users and, on the other hand, would make them competitive with 220 to 330 kV substations. In this case the network reliability can be provided by sectionalizing the lines at the site of transformer connection. This circuit can be used with two-sided substation supply. (LCL)

Gryuntal, Yu.L.; Mikhailov, A.K.; Slavin, G.A.

1978-06-01T23:59:59.000Z

212

Proposed Norton-Tesuque 115 kV overhead transmission line and substation in Sante Fe, New Mexico  

SciTech Connect

Construction is proposed of a 115/12.5-kilovolt (kV), 10/12.5-megavolt-ampere (MVA) substation in the Tesuque area and of 9.02 miles of 115-kV overhead transmission line from the Norton Station to the new substation in an area approximately three miles north of Sante Fe, New Mexico. The project would involve the granting of a 100-foot width right-of-way by the Tesuque Pueblo, the construction of the substation on the Tesuque Pueblo Indian Reservation between the Rio Tesuque and New Mexico 85, the addition of a 115-kV breaker bay at Norton Station, and the installation of two underground 12.47-kV distribution feeders to connect to existing ones in the Tesuque area. In addition, the station would be designed to accommodate one future underground 12.47-kV feeder that would terminate at a future distribution line in the Tesuque area. The preferred transmission line route would originate at the Norton Station and proceed east-northeast up Calabasa Arroyo to a point approximately 1.1 miles north of the southwest corner of the Tesuque Pueblo boundary. From this point the route would proceed east to the proposed substation site.

1985-06-01T23:59:59.000Z

213

Multiple High Voltage Modulators Operating Independently From a Single Common 100 kV DC Power Supply (A26447)  

E-Print Network (OSTI)

Proc. Of 23rd IEEE/NPSS Symposium On Fusion Engineering, San Diego, California; To Be Published In The Proceedings23rd IEEE/NPSS Symposium on Fusion Engineering San Diego California, US, 2009999616315

McDaniel, W.L.

2009-06-17T23:59:59.000Z

214

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the the Interior Bureau of Land Management Las Vegas Field Office Las Vegas, Nevada March 2004 Interstate Intertie Centennial Plan Environmental Assessment Harry Allen - Mead 500kV Transmission Line DOE/EA-1470 Harry Allen-Mead 500kV Transmission Line Project Harry Allen-Mead 500kV Transmission Line Environmental Assessment 1 Chapter 1 Purpose and Need 1.1 Introduction The construction of new transmission and distribution facilities is required throughout the western United States to meet the increasing demand for power as more people move to many of the fastest growing communities. According to Executive Order 13212 dated May 18, 2001, "The increased production and transmission of energy in a safe and environmentally sound manner is essential to the well-being of the American people...agencies shall take appropriate actions, to the extent

215

EA-1972: ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona  

Energy.gov (U.S. Department of Energy (DOE))

ED2 Saguaro No. 2 115-kV Transmission Line Rebuild Project for Central Arizona Project near Eloy, Pinal County, Arizona

216

Proposal to negotiate, without competitive tendering, a contract for the maintenance of three 420 kV circuit breakers  

E-Print Network (OSTI)

This document concerns the award of a contract for the maintenance, by the manufacturer, of three 420 kV circuit breakers. The Finance Committee is invited to agree to the negotiation of a contract, without competitive tendering, with SCHNEIDER ITALY (IT) (formerly NUOVA MAGRINI GALILEO), the manufacturer of the equipment, for the maintenance of three 420 kV circuit breakers for a total amount of 490 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: IT?100%.

2000-01-01T23:59:59.000Z

217

Johnson Creek Artificial Propagation and Enhancement Project Operations and Maintenance Program; Brood Year 1998: Johnson Creek Chinook Salmon Supplementation, Biennial Report 1998-2000.  

DOE Green Energy (OSTI)

The Nez Perce Tribe, through funding provided by the Bonneville Power Administration, has implemented a small scale chinook salmon supplementation program on Johnson Creek, a tributary in the South Fork of the Salmon River, Idaho. The Johnson Creek Artificial Propagation Enhancement project was established to enhance the number of threatened Snake River summer chinook salmon (Oncorhynchus tshawytscha) returning to Johnson Creek through artificial propagation. Adult chinook salmon collection and spawning began in 1998. A total of 114 fish were collected from Johnson Creek and 54 fish (20 males and 34 females) were retained for Broodstock. All broodstock were transported to Lower Snake River Compensation Plan's South Fork Salmon River adult holding and spawning facility, operated by the Idaho Department of Fish and Game. The remaining 60 fish were released to spawn naturally. An estimated 155,870 eggs from Johnson Creek chinook spawned at the South Fork Salmon River facility were transported to the McCall Fish Hatchery for rearing. Average fecundity for Johnson Creek females was 4,871. Approximately 20,500 eggs from females with high levels of Bacterial Kidney Disease were culled. This, combined with green-egg to eyed-egg survival of 62%, resulted in about 84,000 eyed eggs produced in 1998. Resulting juveniles were reared indoors at the McCall Fish Hatchery in 1999. All of these fish were marked with Coded Wire Tags and Visual Implant Elastomer tags and 8,043 were also PIT tagged. A total of 78,950 smolts were transported from the McCall Fish Hatchery and released directly into Johnson Creek on March 27, 28, 29, and 30, 2000.

Daniel, Mitch; Gebhards, John

2003-05-01T23:59:59.000Z

218

Notification of Planned 230kV Outage at Potomac River Generating Station  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sent: Wednesday, May 16, 2007 4:49 PM To: #DOE_Notification@pepco.com Subject: Notification of Planned 230kV Outage at Potomac River Generating Station To Whom It May Concern: This morning Pepco and PJM observed that the generation at the Potomac River Generating Station was having difficulty matching the station generation requirement to the Potomac River area load. Mirant has also informed Pepco and PJM that several generating units were experiencing equipment problems which required them to reduce unit and total plant output. Based on these observations and information received from Mirant, Pepco has elected to cease the current work activities underway on xxxxx high voltage circuit and we will be placing this transmission line back in service this afternoon.

219

A frequency domain model for 3 kV dc traction dc-side resonance identification  

SciTech Connect

Frequency-dependent effects in railway traction power systems arise from the impedance of substation and locomotive line filters and the traction line. Harmonic noise from traction drives and substations can excite resonances and produce overcurrent or overvoltage conditions at critical points in the network. In this paper, the harmonic feeding impedances of a 3 kV DC traction system seen from the rectifier substation, locomotive drive converter and pantograph terminals are presented. Several substation and locomotive filters are considered with a frequency-dependent traction line. Resonances attributed to the substation filter, locomotive filter and traction line are separate and distinct, the line introducing poles and zeros in the audio frequency (AF) range which vary in frequency and magnitude with locomotive position.

Hill, R.J. [Univ. of Bath (United Kingdom). School of Electronic and Electrical Engineering; Fracchia, M.; Pozzobon, P.; Sciutto, G. [Univ. degli Studi di Genova (Italy). Dipt. di Ingegneria Elettrica

1995-08-01T23:59:59.000Z

220

Lightning overvoltage protection of the paddock 362-145 kV Gas-Insulated Substation  

SciTech Connect

Backflashovers close to the Paddiock 362-145 kV Gas-Insulated Substation (GIS) have been analyzed with the Electro-Magnetic Transient Program (EMTP) using a frequency dependent multi-conductor system. The severity of the lightning stroke currents were derived based on recent recordings in the eastern United States. Impacts of corona attenuation and distortion were accounted for using a shunt linear model approach. Turn-up effects of both line insulator flashover voltages and surge arrester protective characteristics were represented based on manufacturer's volt-time curves. Wave shaping effects of substation capacitances (ie., PT's transformers, CCPD's) were also modeled. Results show the importance of various modeling details in determining the overvoltages inside the GIS due to close backflashovers, which are caused by lightning strokes with varying intensity. These results are aimed at better evaluation of lightning protection requirements for GIS protected by metal-oxide surge arresters.

Elahi, H.; Sublich, M. (GE Industry and Utility Sales, Schenectady, NY (US)); Anderson, M.E.; Nelson, B.D. (Wisconsin Power and Light Co., Madison, WI (USA))

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Knowledge engineering tool for training power-substation operators  

Science Conference Proceedings (OSTI)

Artificial intelligence techniques have been applied to create systems that can give answers for different situations and assistance during the substation switching operation. These techniques have also been used for training purposes. This paper presents a computational package for training power substation operators in the control and corrective actions using expert system techniques. Illustrative examples are presented using a 138-kV CEMIG substation.

Lambert-Torres, G. [Escola Federal de Engenharia de Itajuba (Brazil)]|[Univ. of Waterloo, Ontario (Canada); Costa, C.I.A.; Alves da Silva, A.P. [Escola Federal de Engeharia de Itajuba (Brazil); Ribeiro, G.M. [Companhia Energetica de Minas Gerais (Brazil); Quintana, V.H. [Univ. of Waterloo, Ontario (Canada)

1997-04-01T23:59:59.000Z

222

Comparison of prediction and measurement of negative sequence currents of generators connected to 345-kV asymmetrical transmission lines  

Science Conference Proceedings (OSTI)

This paper is used to evaluate the negative sequence currents (NSC) of two generators in a generation plant, which are connected to the power pool through four over-head asymmetrical 345-kV transmission lines. The simulation results by using PSS/E and ... Keywords: EMTP, PSS/E, asymmetrical transmission lines, negative sequence current, unbalance

Chi-Jui Wu; Ping-Heng Ho

2011-03-01T23:59:59.000Z

223

Study on Tubular Busbar Corona Design Optimization of ±660kV HVDC Converter Substation in Qingdao  

Science Conference Proceedings (OSTI)

The HVDC busbar corona characteristic is the main factor taken into account for choosing busbar of HVDC converter substation. By establishing the calculation models of electric field strength along the busbar surface, ground total electric field strength ... Keywords: ±660 kV HVDC, converter substation, corona characteristics, electromagnetic, tubular busbar optimization

Xu Mingming; Li Kejun; Tan Zhenyu; Niu Lin

2010-06-01T23:59:59.000Z

224

Environmental Assessment for the Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Environmental Assessment Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan at the Thomas Jefferson National Accelerator Facility Newport News, Virginia January 2007 U. S. Department of Energy Thomas Jefferson Site Office Newport News, VA DOE/EA-1534 January 2007 C:\TRANSFER\JANUARY 26 Final EA-1534-012607 (2).doc i TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................... 1 1.0 INTRODUCTION ...........................................................................................11 1.1 PREVIOUS ACTIONS....................................................................................11 1.2 SCOPE OF THIS PROPOSED ACTION .......................................................11

225

Fifteen years of GTC operations at Aldel  

Science Conference Proceedings (OSTI)

... within demands imposed by the production process and environmental legislation. ... DUBAL CELL VOLTAGE DROP INITIATIVES TOWARDS LOW ENERGY ... Preparation of solar grade silicon precursor by electrolysis SiO2 in molten salts.

226

Idaho Natural Gas Underground Storage Net Withdrawals All Operators...  

Annual Energy Outlook 2012 (EIA)

Net Withdrawals All Operators (Million Cubic Feet) Idaho Natural Gas Underground Storage Net Withdrawals All Operators (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3...

227

Alaska Natural Gas Underground Storage Net Withdrawals All Operators...  

U.S. Energy Information Administration (EIA) Indexed Site

Net Withdrawals All Operators (Million Cubic Feet) Alaska Natural Gas Underground Storage Net Withdrawals All Operators (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3...

228

Georgia Natural Gas Underground Storage Net Withdrawals All Operators...  

U.S. Energy Information Administration (EIA) Indexed Site

Net Withdrawals All Operators (Million Cubic Feet) Georgia Natural Gas Underground Storage Net Withdrawals All Operators (Million Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3...

229

Environmental assessment: Coolidge-Saguaro 115-kV rehabilitation, Pinal County, Arizona  

Science Conference Proceedings (OSTI)

This Environmental Assessment (EA) presents an analysis of the environmental impacts of the proposed rehabilitation of 29.6 miles of the Coolidge-Saguaro 115-kV transmission line. The project area is in Pinal County, Arizona. The proposal involves reconductoring the line with larger conductor, replacement of deteriorated structures, and replacement of damaged insulators. The proposed action is being considered in order to increase the safety and reliability of this line. The alternative of no action is also addressed in this EA. The proposed action would have insignificant impacts on wildlife, vegetation or other natural resources. There would be no impacts on floodplains or wetlands. The major impact would be on agricultural crops but much of this can be minimized by the timing of construction. There are no conflicts with county or local planning projects. No cultural resources will be affected by the proposed action. The no action alternative would not correct the potential safety hazard or reliability problems of the existing line.

Not Available

1982-09-01T23:59:59.000Z

230

Performance characteristics of the Atlas 60 kV, 60 kJ plastic capacitors  

DOE Green Energy (OSTI)

This paper provides the performance data of Atlas plastic capacitors as supplied by Maxwell Technologies and Aerovox Corporation. The fiberglass cases at 13 inches high by 29 inches wide and 28 inches in depth with a 2 inch by 18 inch bushing on each end. Two styles of the 33.5uF capacitors have been evaluated for Atlas use, a conventional paper-foil and a self-healing metalized-paper and plastic dielectric design. A test program to capacitor failure, is being used to evaluate capacitor lifetime at full voltage (60 kV) and a nominal 15% reversal. With the Atlas parameters, peak currents of {approximately} 340 kA are realized. In anticipation of faults, capacitors are capable, specified, and tested for 700 kA performance. Accurate methods are also utilized to determine capacitor inductance, less than 20 nH. The results of the various capacitor testing programs will be presented in addition to future directives for their R and D efforts.

Reass, W.; Bennet, G.; Bowman, D.; Lopez, E.; Monroe, M.; Parsons, W.

1997-12-01T23:59:59.000Z

231

Draft Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Imperial-Mexicali Imperial-Mexicali DEIS 1-4 May 2004 FIGURE 1.1-1 Regional Setting for Imperial-Mexicali 230-kV Transmission Lines Introduction Imperial-Mexicali DEIS 1-5 May 2004 FIGURE 1.1-2 La Rosita Power Complex: Electrical Distribution 2-40 May 2004 Alternatives Imperial-Mexicali DEIS TABLE 2.5-1 Summary of Impacts for Proposed Action and Other Alternatives by Resource Area a For the proposed action, that is, the granting of one or both of the Presidential permits and ROWs, for most resource areas, the analysis was bounded by calculating impacts as if both lines had been allowed. This serves two purposes. First, it demonstrates the maximum possible impacts; second, it clearly presents the combined impacts of the agencies' preferred alternative, that is, permitting both facilities. The only exceptions to this methodology are in the areas of air, water, and human health. Impacts to air, water, and human

232

U. S. Operating Crude Oil Distillation Capacity (Thousand Barrels ...  

U.S. Energy Information Administration (EIA)

U. S. Operating Crude Oil Distillation Capacity (Thousand Barrels per Day) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9; 1980's ...

233

DOE/EA-1470: Environmental Assessment Harry Allen-Mead 500 kV Transmission Line Project Environmental Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DOE/EA-1470 DEPARTMENT OF ENERGY Western Area Power Administration Finding of No Significant Impact and Floodplain Statement of Findings Nevada Power Company's Harry Allen-Mead 500-kV Transmission Line Project Summary - Nevada Power Company (Nevada Power) proposes to build a 48- mile, 500-kilovolt (kV) transmission line between the Harry Allen Substation, northeast of Las Vegas Nevada, and the Mead Substation, southeast of Las Vegas (Proposed Action). The project would be part of the Interstate Intertie of the Centennial Plan. Of the 48 miles, 32 miles are within lands managed by the Bureau of Land Management (BLM), 8 miles are within lands managed by the US Bureau of Reclamation (USBR), and 4 miles are within lands managed by Western Area

234

Western Area Power Administration, Desert Southwest Region Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm  

NLE Websites -- All DOE Office Websites (Extended Search)

Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Parker-Gila 161-kV Transmission Line Maintenance, Cross Arm Replacements at Structure 0/7 - Continuation Sheet Special Conditions Biological Resources 1. To avoid impacts to nesting birds, project activities will be scheduled between August 1 and February 15, as feasible. Crews shall not cause injury or death to nesting birds, active nests, eggs, or nestlings. If evidence of a nesting bird is found in the project area, crews shall immediately stop work in that area until Western's Environmental Group has been contacted. 2. A qualified biologist will be present during all project activities and serve as the project's Biological Monitor. The Biological Monitor will be authorized by Western to temporarily halt construction activity if needed to prevent harm to desert tortoise. The Biological Monitor's

235

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 1: Main Text and Appendixes A-L U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Cover Sheet Imperial-Mexicali FEIS iii December 2004 COVER SHEET RESPONSIBLE FEDERAL AGENCY: U.S. Department of Energy, Office of Fossil Energy COOPERATING AGENCY: U.S. Department of the Interior, Bureau of Land Management TITLE: Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines LOCATION: Imperial County, California CONTACT: For further information on this environmental impact statement (EIS) contact: Mrs. Ellen Russell Office of Electric Power Regulation Office of Fossil Energy, FE-27

236

EIS-0399: Final EIS for the Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line Comments/Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 Final Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line VOLUME 2 COMMENT RESPONSE DOCUMENT September 2008 United States Department of Energy State of Montana Department of Environmental Quality COVER SHEET Responsible Agencies: U.S. Department of Energy (DOE) and Montana Department of Environmental Quality (DEQ) are co-lead agencies; the Bureau of Land Management (BLM), U.S. Department of the Interior, is a cooperating agency. Title: Final Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line (DOE/EIS-0399) Location: Cascade, Teton, Chouteau, Pondera, Toole, and Glacier counties, Montana. Contacts: For further information about this Final EIS, contact: Ellen Russell, Project Manager,

237

JGI - Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations The Operations Department sees to it that JGI has the best possible facilities and support, ensuring that its operations are conducted in accordance with the...

238

Power Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Operations Outage Coordination Standards of Conduct Transmission Planning You are here: SN Home page > Power Operations Power Operations Western's Sierra Nevada Region...

239

Best Practices for HPFF Pipe Type Cable Assessment, Maintenance and Testing: Blenheim-Gilboa 345-kV Cable Systems  

Science Conference Proceedings (OSTI)

EPRI and the New York Power Authority (NYPA) have sponsored an extensive series of tests on the NYPA Blenheim-Gilboa 345-kV high-pressure fluid-filled (HPFF) transmission cable systems to determine their condition. Several tests were also designed to determine cable power transfer capability based on distributed temperature measurements and to improve the best maintenance practices for the Blenheim-Gilboa HPFF cable systems.

2005-03-01T23:59:59.000Z

240

High-Pressure Fluid-Filled Cable Condition Assessment Through Electrical Impulse Testing of PSE&G 230-kV Service-Aged Cable  

Science Conference Proceedings (OSTI)

This report describes electrical and mechanical testing of a service-aged 230-kV high-pressure fluid-filled (HPFF) cable sample that was removed from a Public Service Electric & Gas (PSE&G) underground transmission line.

2008-11-26T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

STUDY OF ACCELERATED AGING OF 15 kV XLPE AND EPR CABLE INSULATION BY SWITCHING IMPULSES AND ELEVATED AC VOLTAGE.  

E-Print Network (OSTI)

?? Accelerated aging of 15 kV Cross-linked Polyethylene (XLPE) and Ethylene Propylene Rubber (EPR) power cables was carried out in the experiments set for the… (more)

Cao, Linfeng

2010-01-01T23:59:59.000Z

242

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Western Area Power Administration Western Area Power Administration Fort Collins 115-kV Transmission Line Upgrade Project, Fort Collins, Colorado. AGENCY: Western Area Power Administration, DOE ACTION: Finding of no significant impact SUMMARY: The Department of Energy (DOE), Western Area Power Administration (Western) is the lead federal agency for a proposed project to upgrade the electric transmission system in the Fort Collins, Colorado area. Platte River Power Authority (Platte River) is proposing to add additional generation at its Rawhide Power Plant, to rebuild and upgrade segments of Western's existing Flatiron-Poudre and Poudre-Richard's Lake 115-kilovolt (kV) transmission lines, and to install additional 230 kV transmission to Platte River's existing electrical system. Western prepared an environmental assessment (EA) titled "Fort Collins 115kV Transmission

243

Characteristics of Gafchromic XRQA2 films for kV image dose measurement  

SciTech Connect

Purpose: In this study, the relevant characteristics of the new Gafchromic XRQA2 film for its application in measuring kV cone beam computed tomography (CBCT) image doses were thoroughly investigated. Methods: The film was calibrated free in air to air kerma levels between 0 and 9 cGy using 120 kVp photon beams produced by the x-ray volume imager. Films were scanned using transmission and reflection scanning modes with the Epson Expression 10000 XL flat-bed document scanner. The impact of film size, region of interest for the analysis, scan uniformity, scan resolution, scan orientation and alternate scanning sides on the analysis process were investigated. Energy dependence, postirradiation growth of reflectance with time and irradiation angular dependence of the film were tested at different air kerma levels. Results: The net reflectance changed by {approx}3% when the size of the film piece changed from 1 cm x 2 cm to 10 cm x 11 cm and changed by {approx}1% when ROI changed from 0. 7 cm x 0. 7 cm to 8 cm x 8 cm, suggesting a good uniformity of the film. The film was successfully analyzed using the transmission scanning mode, calibration curves from both transmission and reflection scanning modes showed similar behavior. The calibration uncertainty was somewhat lower when the film was scanned using reflection mode (6% and 8% for reflection and transmission modes, respectively.) Higher scanning resolution came with increasing calibration uncertainty. The calibration uncertainty for reflection and transmission modes increased from {approx}3.5% to 7% and from {approx}3.5% to 9%, respectively when scanning resolution was changed from 50 to 400 dpi. Scanning the film on alternate sides using transmission mode led to variation of 16%-19% in the net optical density at doses commonly used for CBCT procedures. The film response changed by almost 10% when it was exposed to beams of two different energies (100 and 120 kVp.) Other features of the film such as film orientation, postexposure growth, and irradiation angular dependence were also investigated. Conclusions: The size of film piece and analysis ROI used for calibration slightly affected the film response. Both transmission and reflection scanning modes can be used to analyze the Gafchromic XRQA2, with the reflection mode having a somewhat lower calibration uncertainty. Scanning films on alternate sides using transmission mode significantly affects the optical density. The film response was shown to be energy dependent. The films reached stability in about 6 h after exposure. The film response was proven to be independent of irradiation angle except when the beam is parallel to the film surface.

Giaddui, Tawfik; Cui Yunfeng; Galvin, James; Chen Wenzhou; Yu Yan; Xiao Ying [Department Of Radiation Oncology, Thomas Jefferson University, Philadelphia, Pennsylvania 19107 (United States)

2012-02-15T23:59:59.000Z

244

Idaho Natural Gas Underground Storage Injections All Operators...  

Gasoline and Diesel Fuel Update (EIA)

Underground Storage Injections All Operators (Million Cubic Feet) Idaho Natural Gas Underground Storage Injections All Operators (Million Cubic Feet) Decade Year-0 Year-1 Year-2...

245

Alaska Natural Gas Underground Storage Injections All Operators...  

U.S. Energy Information Administration (EIA) Indexed Site

Underground Storage Injections All Operators (Million Cubic Feet) Alaska Natural Gas Underground Storage Injections All Operators (Million Cubic Feet) Decade Year-0 Year-1 Year-2...

246

Delaware Natural Gas Underground Storage Injections All Operators...  

U.S. Energy Information Administration (EIA) Indexed Site

Underground Storage Injections All Operators (Million Cubic Feet) Delaware Natural Gas Underground Storage Injections All Operators (Million Cubic Feet) Decade Year-0 Year-1 Year-2...

247

Georgia Natural Gas Underground Storage Injections All Operators...  

U.S. Energy Information Administration (EIA) Indexed Site

Underground Storage Injections All Operators (Million Cubic Feet) Georgia Natural Gas Underground Storage Injections All Operators (Million Cubic Feet) Decade Year-0 Year-1 Year-2...

248

Operations & Maintenance  

NLE Websites -- All DOE Office Websites (Extended Search)

Rates Operations & Maintenance Operations OASIS: WACM (Note: this site is not hosted by Western and requires a digital certificate and login for full access.) wesTTrans Common...

249

DOE/EIS-0365; Final Environmental Impact Statement for the Imperial-Mexicali 230-kV Transmission Lines  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 FINAL ENVIRONMENTAL IMPACT STATEMENT FOR THE IMPERIAL-MEXICALI 230-kV TRANSMISSION LINES Volume 2: Comment and Response Document U.S. Department of Energy Washington, DC U.S. Department of the Interior Bureau of Land Management El Centro, CA Cooperating Agency December 2004 Comment and Response Document Imperial-Mexicali FEIS iii December 2004 CONTENTS NOTATION .......................................................................................................................... v ENGLISH/METRIC AND METRIC/ENGLISH EQUIVALENTS..................................... ix 1 PUBLIC REVIEW OF THE DRAFT ENVIRONMENTAL IMPACT STATEMENT ................................................................................................................ 1-1 1.1 Overview of the Public Review Process

250

Strategy for Updating EPRI's Transmission Line Reference Book: 115-138-kV Compact Line Design ("The Blue Book")  

Science Conference Proceedings (OSTI)

EPRI is sponsoring development of a new, updated edition of the Transmission Line Reference Book: 115-138 kV Compact Line Design, commonly known as the "Blue Book," which was originally published in 1978. The new edition will provide the most up-to-date technical information and practices on the design and maintenance of compact overhead lines. It will enable energy companies to construct cost-effective compact lines that produce optimal performances and to address the ability to maintain compact lines w...

2006-10-30T23:59:59.000Z

251

Paste Plant Operations  

Science Conference Proceedings (OSTI)

Mar 5, 2013 ... It now provides data extraction features that aggregate system ... DUBAL Carbon Plant management team defined and implemented a 3-year strategic ... how to best approach Paste Plant operating and maintenance activities.

252

Operating Experience Summary 2004-07  

NLE Websites -- All DOE Office Websites (Extended Search)

of the 13.2 kV switch, and the detector indicated the presence of voltage. (The National Electric Safety Code defines the minimum safe approach distance to 13.2-kV equipment as 2...

253

150-kV, 80-A SOLID STATE POWER SUPPLY FOR NEUTRAL BEAM INJECTION  

E-Print Network (OSTI)

or in single banks to limit maximum energy available to thereliable energy storage systems. We have operated many banksbanks of 450-V electrolytic capacitors for over 10 joules of energy

Owren, H.

2011-01-01T23:59:59.000Z

254

150-kV, 80-A SOLID STATE POWER SUPPLY FOR NEUTRAL BEAM INJECTION  

E-Print Network (OSTI)

depending on the operating volt- age desired. A singlehas a rating of 2000 x 10 farads at 450 volts DC working. Weon each capacitor to 400 volts with clamping zener diodes. A

Owren, H.

2011-01-01T23:59:59.000Z

255

Operations Information for Studies  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Information for Studies Operations Information for Studies This page contains historical information about hydropower operations. Reclamation UC Region 24-Month Studies FY2009 Load Information (pdf) SLIP total customer loads for Fiscal Year 2009 (Oct, 2008-Sept, 2009) FY2010 Load Information (pdf) SLIP total customer loads for Fiscal Year 2010 (Oct, 2009-Sept, 2010) FY2011 Load Information (pdf) SLIP total customer loads for Fiscal Year 2011 (Oct, 2010-Sept, 2011) FY2012 Load Information (pdf) SLIP total customer loads for Fiscal Year 2012 (Oct, 2011-Sept, 2012) FY2013 Load Information (pdf) SLIP total customer loads for Fiscal Year 2013 (Oct, 2012-Sept, 2013) CRSP Projected Power Releases From USBR (Excel) The most recent file of projected future power releases from CRSP Dams, median projection

256

Updated Operations Assessment Guideline  

Science Conference Proceedings (OSTI)

The Operations Assessment Guideline (OAG) can be used to assess the organization and processes of operations departments. An internal utility team or third party can use this report to guide a team composed of industry experts and members of the assessed utility. This report is an update to EPRI report 1008520, Operations Assessment Guideline, published in March 2005. This improved version includes insights gained after three years of experience with the original report.

2008-03-25T23:59:59.000Z

257

Lightning protection requirements of SF/sub 6/ substation determined by hybrid simulator. [115/345 kv station  

SciTech Connect

The development of a hybrid computer simulation which can provide the type and quantity of data necessary for determining the behavior of lightning-caused surges traveling through substations is discussed. Results from a specific application on a 115-kV/345-kV station are presented. The results show that the simulation of SF/sub 6/ substations during lightning-caused surges is ideally accomplished by hybrid computer. The quantity of data for complete substation analysis may be gathered efficiently. In addition, digital graphical summaries provide quick insight into substation behavior. The application of this method to simple configurations has shown the previous assumptions must be carefully reviewed. For example, it is shown by computer simulation and analytical hand calculation that the surges with the steepest wave fronts may not produce the highest substation voltages. It is concluded that this hybrid simulation is an excellent tool in the determination of SF/sub 6/ substation response to lightning-caused surges. (LCL)

Tranen, J.D. (New England Electric System, Westborough, MA); Hedin, R.A.; Minnick, J.J.; Priest, K.W.

1977-01-01T23:59:59.000Z

258

Development of 1200-kV compressed-gas-insulated transmission and substation equipment in the United States  

SciTech Connect

Major research and development (R and D) programs for the development of sulfur hexafluoride (SF/sub 6/) compressed-gas-insulated (CGI) equipment for ultrahighvoltage (uhv) application at 100-1200 kV have been under way independently in both the United States and Japan. The CGI transmission and substation equipment under study and development in these countries has included the surge arrester, circuit breaker, CGI transmission bus, disconnect and ground switches, and an air-SF/sub 6/ termination. The US CGI program has also included development of a power transformer, shunt reactor, voltage- and current-sensing instrumentation, and a line trap, all for 1200-kV application. This paper presents the overall status of development of CGI substation equipment for uhv application in the United States. It describes the major CGI components developed, highlights their key design aspects, indicates the present status of development and testing, and addresses the work remaining to establish final design consepts. The paper also includes 23 references, a number of which have not been widely distributed or included in any of the recently published bibliographies of uhv substation equipment.

Walldorf, S.P.; Gnadt, P.A.

1986-01-01T23:59:59.000Z

259

THE ORNL ANALYTICAL CHEMISTRY DIVISION'S 150-KV COCKCROFT-WALTON GENERATOR  

SciTech Connect

A general description of the facilities used to house a small Cockcroft- Walton generator is presented. Preliminary irformation and data are given as to the operational performance of the generator, the radiation safety controls involved, and the expected use of the device, In addition, an automatic-manual device for control of tritium target usage is described. (auth)

Strain, J.E.; Hampton, W.J.; Leddicotte, G.W.

1962-09-10T23:59:59.000Z

260

Federal Draft Environmental Impact Statement and State of Montana Supplemental Draft Environmental Impact Statement for the Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S-1 S.1 Introduction This document is both a State of Montana Supplemental Draft Environmental Impact Statement (EIS) and a U.S. Department of Energy (DOE) Federal Draft EIS (referred to herein as the Draft EIS for both state and federal purposes) prepared for the United States portion of the proposed Montana Alberta Tie Ltd. (MATL) 230-kilovolt (kV) transmission line. MATL has proposed to construct an international 230-kV alternating current merchant (private) transmission line that would originate at an existing NorthWestern Energy (NWE) 230-kV switch yard at Great Falls, Montana, and extend north to a new substation to be constructed northeast of Lethbridge, Alberta, crossing the U.S.-Canada international border north of Cut Bank, Montana (proposed Project). Approximately

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

PLATO administers operator training  

SciTech Connect

Baltimore Gas and Electric Co. is committed to an in-depth training program for substation operators. For the past two years, one important part of the training program has been a computer-based educational system with a CRT touch-response graphic display that is interactive with the trainee. This system, known as PLATO, reproduces a training situation so realistic that the operator becomes completely involved with the lesson. When used for pretraining prior to substation operating experience, it provides a hands-on insight into operating practices without jeopardizing personnel or equipment, or degrading customer service.

Buehner, R.E.

1979-02-15T23:59:59.000Z

262

DOE Exercises 5 Year Option on Washington TRU Solutions Contract...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP January 18, 2005 -...

263

OPERATIONS (OPS)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OPS) OPS) OBJECTIVE OPS.1 The formality and discipline of operations is adequate to conduct work safely and programs are in place to maintain this formality and discipline. (CR 13) Scope: The Conduct of Operations Program was evaluated during the recent KE Basin FTS ORR and was found to be adequately implemented. Based on this result and the subsequent program enhancements, the scope of the review is to be limited to the SWS operating and maintenance evolutions. Criteria * Programmatic elements of conduct of operations are in place for SWS operations. (DOE Order 5480.19) * The SWS operations personnel adequately demonstrate the principles of conduct of operations requirements during the shift performance period. (DOE Order 5480.19)

264

Improvements in the computation of balances and localization of commercial losses of electric energy in 0.38-kV networks  

SciTech Connect

An example of four 0.38-kV overhead distribution lines fed from a 10/0.4-kV transformer substation of the Grodno Electrical Networks (Belarus') and supplying electricity to a cottage area is used for analyzing energy balances and commercial losses in the networks. It is shown that the reliability of such analysis can be ensured by the use of modern software and electronic energy meters recording a retrospective of half-hourly intervals of active and reactive electric energy.

Vorotnitskii, V. Z.; Zaslonov, S. V.; Lysyuk, S. S. [Electric Power Research Institute (VNIIE) (Russian Federation)

2006-11-15T23:59:59.000Z

265

High speed transfer switch with 50 kA and 50 kV  

SciTech Connect

This paper gives the mechanical design and electrical parameters of a pneumatically operated transfer switch. This design is used to switch 3-second 50-kA current pulses, and is easily capable of 75 kA operation (2 {times} 10{sup 10} I{sup 2}t); with water-cooled versions capable of 20 kA continuously. Although the switch is not specifically designed to make or break 50 kA, it is provided with auxiliary Elkonite arcing contacts have proven their value in protecting the main electrodes even under repetitive (50 kA) fault conditions. Included in this presentation will be the results of extensive life testing and associated criteria. 6 figs., 1 tab.

Reass, W.A.; Kasik, R.J.; Wilds, W.A.

1989-01-01T23:59:59.000Z

266

Outline of Guide for Application of Transmission Line Surge Arresters 42 to 765 kV  

Science Conference Proceedings (OSTI)

Lightning flashovers are the most frequent cause of transmission line outages. Transmission line surge arresters (TLSA) limit lightning overvoltages between phase conductors and towers, and thus eliminate most outages on protected structures. This guide provides a tutorial on the relevant lightning phenomena, with an in-depth look at the operation, application, and placement of TLSA to maximize flashover protection and minimize capital investment. The guide also describes ways to improve tower grounding ...

2006-10-29T23:59:59.000Z

267

Site Operator Program  

DOE Green Energy (OSTI)

Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

Warren, J.F.

1991-12-31T23:59:59.000Z

268

Site Operator Program  

DOE Green Energy (OSTI)

Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

Warren, J.F.

1991-01-01T23:59:59.000Z

269

Tennessee Valley Authority Buffalo Mountain Wind Power Project First- and Second-Year Operating Experience: 2001-2003: U.S. Departme nt of Energy - EPRI Wind Turbine Verification Program  

Science Conference Proceedings (OSTI)

This report describes the turbine performance and operating experience from July 2001 through June 2003 at the Tennessee Valley Authority (TVA) Buffalo Mountain Wind Power Project, located near Oliver Springs, Tennessee. The report summarizes the project's wind resource data, energy production, availability, operation and maintenance experience, and power curve performance measurements. Lessons learned from the project will be valuable to other utilities or companies planning similar wind power projects.

2003-12-22T23:59:59.000Z

270

Government Operation  

Science Conference Proceedings (OSTI)

Use Cases from NBD(NIST Big Data) Requirements WG V1.0. http://bigdatawg. nist.gov/home.php. Contents. Blank Template. Government Operation ...

2013-09-07T23:59:59.000Z

271

Operations Research  

E-Print Network (OSTI)

Mar 1, 2005 ... Operations Research. Report 2005-01. On a closedness theorem. Miklós Ujvári. Marc 2005. Eötvös Loránd University of Sciences. Department ...

272

Operating Instructions  

Science Conference Proceedings (OSTI)

... The system operation is center around 3 areas of the equipment 1) Deposition chamber 2) Vaporizer 3) Chiller/cold finger ...

2013-01-18T23:59:59.000Z

273

U.S. Offshore Crude Oil and Natural Gas Rotary Rigs in Operation ...  

U.S. Energy Information Administration (EIA)

U.S. Offshore Crude Oil and Natural Gas Rotary Rigs in Operation (Number of Elements) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 ...

274

Field Operations Program  

NLE Websites -- All DOE Office Websites (Extended Search)

688 688 May 1999 Field Operations Program Activities Status Report Fiscal Years 1997 through mid-1999 J. E. Francfort D. V. O'Hara L. A. Slezak DOE/ID-10688 Field Operations Program Activities Status Report Fiscal Years 1997 through mid-1999 J. E. Francfort 1 D. V. O'Hara 2 L. A. Slezak 2 Published May 1999 Idaho National Engineering and Environmental Laboratory Automotive Systems and Technology Department Lockheed Martin Idaho Technologies Company Idaho Falls, Idaho 83415 Prepared for the U.S. Department of Energy Idaho Operations Office 1 INEEL/Lockheed Martin Idaho Technologies Co. 2 U.S. Department of Energy iii EXECUTIVE SUMMARY The Field Operations Program is an electric vehicle testing and evaluation program sponsored by U.S. Department of Energy and managed by the Idaho National Engineering and Environmental

275

Operating plan FY 1998  

SciTech Connect

This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

1997-10-01T23:59:59.000Z

276

Operations research  

Science Conference Proceedings (OSTI)

In Evita, Andrew Lloyd Webber and Tim Rice wrote: Politics, the Art of the Possible. To those of us in the operations research community, we postulate: Operations Research, the Science of Better - (i.e. better processes, better systems and better decisions). ...

William P. Pierskalla

2009-01-01T23:59:59.000Z

277

Operation crosscheck  

SciTech Connect

This report consists of three sections covering the three major areas of Lawrence Livermore Laboratory`s participation in Operation Crosscheck. These areas are: Diagnostic Aircraft; Radiochemical Sampling; and Device Assembly and Handling, Barbers Point. The information contained in these sections has been extracted from Crosscheck post-operation reports.

Gilbert, F. C.

1964-11-06T23:59:59.000Z

278

Connecticut Natural Gas Underground Storage Injections All Operators...  

U.S. Energy Information Administration (EIA) Indexed Site

Underground Storage Injections All Operators (Million Cubic Feet) Connecticut Natural Gas Underground Storage Injections All Operators (Million Cubic Feet) Decade Year-0 Year-1...

279

Wisconsin Natural Gas Underground Storage Injections All Operators...  

U.S. Energy Information Administration (EIA) Indexed Site

Underground Storage Injections All Operators (Million Cubic Feet) Wisconsin Natural Gas Underground Storage Injections All Operators (Million Cubic Feet) Decade Year-0 Year-1...

280

Review for the State of the Art and Application of Polymer Materials / Insulation used in Distribution Class (12 - 46 kV class) Substations  

Science Conference Proceedings (OSTI)

This report covers the results of a state-of-art study into distribution class (12-46 kV) polymer-based products, the technology used to manufacture them, utility experiences, field potential inspection and diagnostic technique, and utility interest for future research and development to be conducted by EPRI.

2003-11-24T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Longitudinal Load and Cascading Failure Risk Assessment (CASE): Central Louisiana Electric Cooperative's 500-kV Toledo-Coushatta Transmission Line  

Science Conference Proceedings (OSTI)

EPRI's Cascading Failure Risk Assessment (CASE) methodology was used to determine extreme event, unbalanced loads on Central Louisiana Electric Company's (CLECO) 500-kV, single circuit, Toledo-Coushatta transmission line. The methodology also identified the line's cascading potential under different loading conditions.

1998-03-11T23:59:59.000Z

282

Operational Waste Volume Projection  

SciTech Connect

Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

STRODE, J.N.

2000-08-28T23:59:59.000Z

283

TRIGA reactor operating experience  

SciTech Connect

The Oregon State TRIGA Reactor (OSTR) has been in operation 3 years. Last August it was upgraded from 250 kW to 1000 kW. This was accomplished with little difficulty. During the 3 years of operation no major problems have been experienced. Most of the problems have been minor in nature and easily corrected. They came from lazy susan (dry bearing), Westronics Recorder (dead spots in the range), The Reg Rod Magnet Lead-in Circuit (a new type lead-in wire that does not require the lead-in cord to coil during rod withdrawal hss been delivered, much better than the original) and other small corrections.

Anderson, T.V. [Oregon State University, Corvallis, OR (United States)

1970-07-01T23:59:59.000Z

284

Operation Terminology  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Conservation Magnets require a large amount of power to control a particle beam. In order to conserve energy and money when a beam line is down, Operations will install a...

285

Measurement of autonomous operation  

Science Conference Proceedings (OSTI)

While robotic systems and the field of Artificial Intelligence (AI) have been funded through the Department Of Defense (DoD) and Industry for decades, it was not until recent years that the combination of these two technologies has made truly significant ... Keywords: C4ISR, automated decision aid (ADA), autonomous control, autonomous operations, unmanned aerial system

W. Hamel

2010-09-01T23:59:59.000Z

286

SSA Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Area Operations (SSA-Ops) Area Operations (SSA-Ops) "BOREAS Ops" was located at the Snodrifters Lodge, in Candle Lake, Saskatchewan. Radiosonde balloon launch at Ops The NASA Helicopter lands at Ops A meeting at the Snodrifter's Lodge Release of a radiosonde at the SSA operations center in Candle Lake. Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help | User Services - Tel: +1 (865) 241-3952 or E-mail: uso@daac.ornl.gov

287

BOREAS Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Study Area Operations/Thompson Airport (NSA-Ops) Study Area Operations/Thompson Airport (NSA-Ops) NSA Operations (NSA-Ops) The Keewatin Air Hanger: site of BOREAS Ops 1994 Dr. Piers Sellers working in Ops, 1994 BOREAS "Air Force" The NASA C-130 The University of Wyoming King Air The NASA Helicopter The NRC Twin Otter The NCAR Electra The Ontario Chieftain Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos SSA Photos || SSA-Airport Photos | SSA-Fen Photos | SSA-Mix Photos | SSA-OA Photos | SSA-OBS Photos | SSA-OJP Photos | SSA-YA Photos | SSA-YJP Photos | SSA-Ops Photos | ORNL DAAC Home || ORNL Home || NASA || Privacy, Security, Notices || Data Citation || Rate Us || Help |

288

Seasonal Patterns of Melatonin, Cortisol, and Progesterone Secretion in Female Lambs Raised Beneath a 500-kV Transmission Line.  

SciTech Connect

Although several kinds of biological effects of electric and magnetic fields have been reported from laboratory studies, few have been independently replicated. When this study was being planned, the suppression of nighttime melatonin in rodents was thought to represent one of the strongest known effects of these fields. The effect had been replicated by a single laboratory for 60-Hz electric fields, and by multiple laboratories for d-c magnetic fields. The primary objective of this study was to determine whether the effect of electric and magnetic fields on melatonin would also occur in sheep exposed to a high voltage transmission line. The specific hypothesis tested by this experiment was as follows: The electrical environment produced by a 60-Hz, 500-kV transmission line causes a depression in nocturnal melatonin in chronically exposed female lambs. This may mimic effects of pinealectomy or constant long-day photoperiods, thus delaying the onset of reproductive cycles. Results of the study do not provide evidence to support the hypothesis. Melatonin concentrations in the sheep exposed to the transmission line showed the normal pattern of low daytime and high nighttime serum levels. As compared to the control group, there were no statistically significant group differences in the mean amplitude, phase, or duration of the nighttime melatonin elevation.

Lee, Jack M.

1992-06-01T23:59:59.000Z

289

Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)  

SciTech Connect

The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

N /A

2003-10-27T23:59:59.000Z

290

Integrated formal operations plan  

SciTech Connect

The concept of formal operations (that is, a collection of business practices to assure effective, accountable operations) has vexed the Laboratory for many years. To date most attempts at developing such programs have been based upon rigid, compliance-based interpretations of a veritable mountain of Department of Energy (DOE) orders, directives, notices, and standards. These DOE dictates seldom take the broad view but focus on highly specialized programs isolated from the overall context of formal operations. The result is a confusing array of specific, and often contradictory, requirements that produce a patchwork of overlapping niche programs. This unnecessary duplication wastes precious resources, dramatically increases the complexity of our work processes, and communicates a sense of confusion to our customers and regulators. Coupled with the artificial divisions that have historically existed among the Laboratory`s formal operations organizations (quality assurance, configuration management, records management, training, etc.), this approach has produced layers of increasingly vague and complex formal operations plans, each of which interprets its parent and adds additional requirements of its own. Organizational gridlock ensues whenever an activity attempts to implement these bureaucratic monstrosities. The integrated formal operations plan presented is to establish a set of requirements that must be met by an integrated formal operations program, assign responsibilities for implementation and operation of the program, and specify criteria against which the performance of the program will be measured. The accountable line manager specifies the items, processes, and information (the controlled elements) to which the formal operations program specified applies. The formal operations program is implemented using a graded approach based on the level of importance of the various controlled elements and the scope of the activities in which they are involved.

Cort, G.; Dearholt, W.; Donahue, S.; Frank, J.; Perkins, B.; Tyler, R.; Wrye, J.

1994-01-05T23:59:59.000Z

291

Stirling machine operating experience  

Science Conference Proceedings (OSTI)

Numerous Stirling machines have been built and operated, but the operating experience of these machines is not well known. It is important to examine this operating experience in detail, because it largely substantiates the claim that stirling machines are capable of reliable and lengthy operating lives. The amount of data that exists is impressive, considering that many of the machines that have been built are developmental machines intended to show proof of concept, and are not expected to operate for lengthy periods of time. Some Stirling machines (typically free-piston machines) achieve long life through non-contact bearings, while other Stirling machines (typically kinematic) have achieved long operating lives through regular seal and bearing replacements. In addition to engine and system testing, life testing of critical components is also considered. The record in this paper is not complete, due to the reluctance of some organizations to release operational data and because several organizations were not contacted. The authors intend to repeat this assessment in three years, hoping for even greater participation.

Ross, B. [Stirling Technology Co., Richland, WA (United States); Dudenhoefer, J.E. [Lewis Research Center, Cleveland, OH (United States)

1994-09-01T23:59:59.000Z

292

(DOE/EIS-0285/SA 118): Supplement Analysis for the Transmission System Vegetation Management Program EIS, Holcomb-Naselle 115kV)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2003 7, 2003 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-SA 118, Holcomb - Naselle 115 kV. James A. Jellison - TFO/Olympia Proposed Action: Vegetation Management along the Holcomb Naselle 115kV transmission line corridor from structure 1/1 through structure 21/10. Right of way width averages 100 feet. Location: The project area is located in Pacific County, Washington. Proposed by: Bonneville Power Administration (BPA). Description of the Proposal: BPA proposes to remove unwanted vegetation along the right-of- way, access roads and around tower structures along the subject transmission line corridor. Approximately 21 miles of right-of-way will be treated using selective and non-selective

293

"ALON ISRAEL OIL COMPANY LTD",820,13,"ALON BAKERSFIELD OPERATING INC","West Coast","California","BAKERSFIELD",5,"CAT HYDROCRACKING, GAS OIL","Downstream Charge Capacity, Current Year (barrels per calendar day)",14250  

U.S. Energy Information Administration (EIA) Indexed Site

CORPORATION","SURVEY","PERIOD","COMPANY_NAME","RDIST_LABEL","STATE_NAME","SITE","PADD","PRODUCT","SUPPLY","QUANTITY" CORPORATION","SURVEY","PERIOD","COMPANY_NAME","RDIST_LABEL","STATE_NAME","SITE","PADD","PRODUCT","SUPPLY","QUANTITY" "ALON ISRAEL OIL COMPANY LTD",820,13,"ALON BAKERSFIELD OPERATING INC","West Coast","California","BAKERSFIELD",5,"CAT HYDROCRACKING, GAS OIL","Downstream Charge Capacity, Current Year (barrels per calendar day)",14250 "ALON ISRAEL OIL COMPANY LTD",820,13,"ALON BAKERSFIELD OPERATING INC","West Coast","California","BAKERSFIELD",5,"CAT HYDROCRACKING, GAS OIL","Downstream Charge Capacity, Current Year (barrels per stream day)",15000

294

DOE/EA-1354; Environmental Assessment for the Fort Collins 115kV Transmission Line Upgrade Project (12/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT FOR THE FORT COLLINS 115kV TRANSMISSION LINE UPGRADE PROJECT Prepared for: Platte River Power Authority and U.S. Department of Energy Western Area Power Administration DOE/EA 1354 September 2001 i TABLE OF CONTENTS SUMMARY ............................................................................................................... S-1 1.0 INTRODUCTION ...............................................................................................1-1 1.1 DESCRIPTION OF PROPOSED PROJECT .................................................................. 1-1 1.3 PURPOSE OF ENVIRONMENTAL ASSESSMENT....................................................

295

Transformer requirements for the year 2000. Final report, December 1979  

Science Conference Proceedings (OSTI)

The principal objective of this program was to determine the design parameters required for transformers of the year 2000. The approach to meeting this objective was to determine the changes which may occur in transmission and distribution systems over the next twenty years, and how these changes might affect design parameters of distribution and power transformers. Emphasis was placed on domestic requirements, although the impact of international practices was factored into the overall requirements for transformers. Possible investigations that could help transformer designers meet the long term technical requirements of future transformers were also identified. The principal conclusions of this study were: 1200 kV transmission could be in service by the late 1980's and it is essential to develop 1200 kV transformers for these systems; transformer manufacturers must be prepared to supply higher MVA ratings at all voltage levels; there will be a strong demand for low-loss, minimum cost transformers; and environmental/safety, reliability, and size reduction considerations will increase in importance. (LLL)

Not Available

1980-06-01T23:59:59.000Z

296

ORNL radioactive waste operations  

SciTech Connect

Since its beginning in 1943, ORNL has generated large amounts of solid, liquid, and gaseous radioactive waste material as a by-product of the basic research and development work carried out at the laboratory. The waste system at ORNL has been continually modified and updated to keep pace with the changing release requirements for radioactive wastes. Major upgrading projects are currently in progress. The operating record of ORNL waste operation has been excellent over many years. Recent surveillance of radioactivity in the Oak Ridge environs indicates that atmospheric concentrations of radioactivity were not significantly different from other areas in East Tennesseee. Concentrations of radioactivity in the Clinch River and in fish collected from the river were less than 4% of the permissible concentration and intake guides for individuals in the offsite environment. While some radioactivity was released to the environment from plant operations, the concentrations in all of the media sampled were well below established standards.

Sease, J.D.; King, E.M.; Coobs, J.H.; Row, T.H.

1982-01-01T23:59:59.000Z

297

Condition Assessment of 138-kV Iwilei-Archer High-Pressure Fluid-Filled Cable System of Hawaiian Electric Company  

Science Conference Proceedings (OSTI)

High-pressure fluid-filled (HPFF) transmission cable systems are characterized by an exceedingly long life, with well-maintained integrity of the pipe and operating pressure. However, some failures have been encountered in the past 15 years, probably due to advancing age and harder use. The cable systemswhich are composed of the cable, splices, terminations, trifurcators, pumping plants, risers, and so onshould be adequately maintained and routinely inspected.

2011-04-13T23:59:59.000Z

298

Design and operating experience of an ac-dc power converter for a superconducting magnetic energy storage unit  

DOE Green Energy (OSTI)

The design philosophy and the operating behavior of a 5.5 kA, +-2.5 kV converter, being the electrical interface between a high voltage transmission system and a 30 MJ superconducting coil, are documented in this paper. Converter short circuit tests, load tests under various control conditions, dc breaker tests for magnet current interruption, and converter failure modes are described.

Boenig, H.J.; Nielsen, R.G.; Sueker, K.H.

1984-01-01T23:59:59.000Z

299

Operating Plan of Mirant Potomac River, LLC in Compliance with Order No.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operating Plan of Mirant Potomac River, LLC in Compliance with Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 Docket No. EO-05-01: Attached is the Operating Plan of Mirant Potomac River, LLC, which is being submitted in compliance with Order No. 202-05-03, issued by the Department of Energy on December 20, 2005, in the captioned proceeding. Operating Plan of Mirant Potomac River, LLC in Compliance with Order No. 202-05-03 More Documents & Publications Supplement Number 1 to Operating Plan of Mirnat Potomac River, LLC in Compliance with Order No. 202-05-03 Re: Potomac River Generating Station Department of Energy Case No. EO-05-01: Advanced Notice of Power Outages. Docket No. EO-05-01: Further Notice of 230kV Circuit Planned Outages

300

Bipolar HVDC Transmission System Study Between (+ or -) 600 kV and (+ or -) 1200 kV--Corona Studies, Phase II  

Science Conference Proceedings (OSTI)

This report documents a study of the corona performance characteristics of a 6 x 4.06 cm conductor bundle tested under all possible weather conditions and at voltages ranging from plus/minus 750 to plus/minus 1050 kV. Radio interference, audible noise, and corona loss performance were evaluated, and the influence of line voltage on these parameters was studied. Data were collected on the lateral profiles of radio interference, audible noise, ion current density, and electric field at ground level. Electr...

1982-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Failure Analysis of a 345 kV High-Pressure, Fluid-Filled Cable Insulated with Laminated Paper Polypropylene at New York Power Author ity  

Science Conference Proceedings (OSTI)

Three cable pieces of a 345-kV high-pressure, fluid-filled, laminated paper151polypropylene (LPP) cable, each nearly 3 ft in length, were received from New York Power Authority in January 2010. The Detroit Edison Company performed the dissection and analysis to address the cause(s) of the failure that occurred in late December 2009 and that was experienced by this 10.1 circuit-mile cable that had been energized in service in May 1991. One of the pieces contained the failure, and the other two were adjace...

2011-02-28T23:59:59.000Z

302

Case Study of the Failure of two 13.8kV Control & Metering Transformers that caused significant Equipment Damage  

SciTech Connect

The degradation and failure of cast-coil epoxy windings within 13.8kV control power transformers and metering potential transformers has been shown to be dangerous to both equipment and personnel, even though best industrial design practices were followed. Accident scenes will be examined for two events at a U.S. Department of Energy laboratory. Failure modes will be explained and current design practices discussed with changes suggested to prevent a recurrence and to minimize future risk. New maintenance philosophies utilizing partial discharge testing of the transformers as a prediction of end-of-life will be examined.

Dreifuerst, G R; Chew, D B; Mangonon, H L; Swyers, P W

2011-08-25T23:59:59.000Z

303

Realities of Chiller Plant Operation: Utility Impacts on Owner Operating  

NLE Websites -- All DOE Office Websites (Extended Search)

Realities of Chiller Plant Operation: Utility Impacts on Owner Operating Realities of Chiller Plant Operation: Utility Impacts on Owner Operating Costs and Societal Environmental Issues Speaker(s): Don Aumann Date: March 21, 2000 - 12:00pm Location: Bldg. 90 Seminar Host/Point of Contact: Satkartar K. Kinney Don Aumann, a Senior Consultant from BKi in Oakland, will present an overview of two projects he completed for the electric utility industry. The first, a case study evaluation of a hybrid chiller plant in Jefferson City, Missouri, demonstrates the importance of carefully evaluating the impact of utility rate structures on plant operating costs. The building owner, another engineering consultant, and the local utility representatives were confused by the rates and missed an opportunity to cut chiller-plant operating costs by about 20%, totaling $15,000 per year. In

304

Westinghouse TRU Solutions LLC Assumes WIPP Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Manager of WTS. A retired U.S. Navy Rear Admiral, Herrera has more than 27 years of nuclear operations and radioactive waste management experience. He spent 24 years in nuclear...

305

GNF2 Operating Experience  

Science Conference Proceedings (OSTI)

GNF's latest generation fuel product, GNF2, is designed to deliver improved nuclear efficiency, higher bundle and cycle energy capability, and more operational flexibility. But along with high performance, our customers face a growing need for absolute fuel reliability. This is driven by a general sense in the industry that LWR fuel reliability has plateaued. Too many plants are operating with fuel leakers, and the impact on plant operations and operator focus is unacceptable. The industry has responded by implementing an INPO-coordinated program aimed at achieving leaker-free reliability by 2010. One focus area of the program is the relationship between fuel performance (i.e., duty) and reliability. The industry recognizes that the right balance between performance and problem-free fuel reliability is critical. In the development of GNF2, GNF understood the requirement for a balanced solution and utilized a product development and introduction strategy that specifically addressed reliability: evolutionary design features supported by an extensive experience base; thoroughly tested components; and defense-in-depth mitigation of all identified failure mechanisms. The final proof test that the balance has been achieved is the application of the design, initially through lead use assemblies (LUAs), in a variety of plants that reflect the diversity of the BWR fleet. Regular detailed surveillance of these bundles provides the verification that the proper balance between performance and reliability has been achieved. GNF currently has GNF2 lead use assemblies operating in five plants. Included are plants that have implemented extended power up-rates, plants on one and two-year operating cycles, and plants with and without NobleChem{sup TM} and zinc injection. The leading plant has undergone three pool-side inspections outages to date. This paper reviews the actions taken to insure GNF2's reliability, and the lead use assembly surveillance data accumulated to date to validate the adequacy/expected behavior of the design. (authors)

Schardt, John [GE Energy, Nuclear, 3901 Castle Hayne Road, Wilmington, NC 28402 (United States)

2007-07-01T23:59:59.000Z

306

Technical Standards, Fiscal Year 2007 Agency Report - February...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

research, energy efficency, oil storage, hydroelectric power, accelerator operations, nuclear facility decommissioning, and fusion experiments. Technical Standards, Fiscal Year...

307

Three Years of Operational Prediction of Forecast Skill at NMC  

Science Conference Proceedings (OSTI)

In real time since 1990, the National Meteorological Center (NMC) has been running a system to predict the forecast skill of the medium-range forecasts produced by the NMC global spectral model. The predictors used are the agreement of an ...

Richard L. Wobus; Eugenia Kalnay

1995-07-01T23:59:59.000Z

308

First 15 Years of Operation of the Noranda Converter  

Science Conference Proceedings (OSTI)

Transfer and Consumption of Oxygen in Gold-bearing Sulfide Ores: Agnico-eagle Mines Trials · Tundish Process Performance Improvement: Some Indian Case ...

309

Site Operator Program Final Report for Fiscal Years 1992 through...  

NLE Websites -- All DOE Office Websites (Extended Search)

Troubleshooting electric vehicle faults * Component removal and replacement procedures * Electric vehicle safety. Field Data Collection The majority of field testing activities...

310

Alert State Detection and Switching Order Generation at a 400/120 kV Substation using Knowledge Server  

E-Print Network (OSTI)

At the operator level a new, PC-based SCADA system was introduced at the electrical substation of the Paks Nuclear Power Plant. An AI-based, intelligent advisory system was developed and connected to the SCADA system as knowledge server. The paper describes some of the advisory functions and their realizations in rules and procedures. Besides increasing reliability and safety of energy supply the basic goal of the system is to assist the operator in faster and more effective reactions, and to assist the plant engineer to better understand and evaluate any possible events.

Nacsa Kovcs Nacsa

2001-01-01T23:59:59.000Z

311

Greenhouse Gas Inventory Academic Years 2001 2007  

E-Print Network (OSTI)

Greenhouse Gas Inventory Academic Years 2001 2007 #12;Greenhouse Gas Inventory Academic Years 2001 is to identify and quantify the major sources of greenhouse q y j g gas emissions which result from the operation of the University.y #12;Greenhouse Gas Inventory Academic Years 2001 2007 · Major sources

McConnell, Terry

312

Electric Vehicle Site Operator Program  

DOE Green Energy (OSTI)

Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy's Electric Vehicle Site Operator Program. Through participation is this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort stationwagons.

Not Available

1992-01-01T23:59:59.000Z

313

Study about numerical relay SEL-387 for overcurrent and differential protections of 110/20 kV transformers  

Science Conference Proceedings (OSTI)

Nowadays, the main problems of the relay protections result from the fact that in the modern electric systems the performances imposed to the protections operation became very severe, enhancing the difficulty in their simultaneous satisfaction. In these ... Keywords: differential protection, numerical protection relay, overcurrent protection, transformer

Angela Iagar; Gabriel Nicolae Popa; Corina Maria Dinis; Gheorghe Moraru

2009-07-01T23:59:59.000Z

314

Office of Business Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations HSS Logo Office of Business Operations Reports to the Office of Resource Management Director's Message Welcome to the Office of Business Operations Richard D....

315

Operations Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Strategic Plan Updated July 2009 Operations Organization Chief Operating Officer (COO) Deputy COO Environment, Health & Safety EH&S Facilities FAC Project Management...

316

Program Operations Plan  

SciTech Connect

The Department of Energy's Atmospheric Chemistry Program (ACP) was initiated in 1991 to coordinate DOE's university and federal-laboratory atmospheric-chemistry research, and to focus these efforts on national and international information requirements in the atmospheric-chemistry field. This Program Operations Plan describes the structure and vision of the effort designed to fulfill these needs, and is divided into two major components. The first of these is a Strategic Plan, which outlines the ACP's rationale, objectives, and vision, and describes its products that are anticipated over a future ten-year period. Although based on realistic appraisals of goals that are attainable given the financial, material, and intellectual resources of the ACP community, this Strategic Plan does not describe these resources themselves. The second component of the Program Operations Plan, the Implementation Plan, deals directly with these resource considerations. As such it focuses on practical implementation of Strategic-Plan elements at the individual research institutions, the anticipated scientific contributions of these groups, and their coordination within the ACP. In contrast to the Strategic Plan, this Implementation Plan extends only five years into the future.

1993-04-01T23:59:59.000Z

317

APS Long Range Operations Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Shutdown Planning Shutdown Planning Planning Templates Shutdown Planning Schedules: Current Shutdown Schedule Archives: 2006 - 2013 APS Long-Range Operations Schedule: 2014 Archives: 2013 | 2012 2011 | 2010 | 2009 | 2008 2007 | 2006 | 2005 | 2004 2003 | 2002 | 2001 | 2000 1999 | 1998 | 1997 | 1996 APS Long-Range Operations Schedule (Fiscal Year 2014) Alternate Formats: iCal | Excel | PDF APS Long-Range Operation Schedule 2013-3 2014-1 2014-2 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep 1 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2

318

Operations Directorate (OPS Directorate)  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Directorate (OPS Directorate) Operations Directorate (OPS Directorate) Purpose A group chartered by the Associate Laboratory Director for the Advanced Photon Source that includes the responsible Division Directors and other appropriate APS operations personnel. The Operations Directorate collectively coordinates operating decisions that affect the facility as a whole and establishes both long- and short-term schedules, including scheduled maintenance and facility improvement periods. The Operations Directorate is the APS forum in which decisions regarding operations are discussed: These include, but are not limited to: Safety issues related to operations Operational Schedule Global operating parameters within the defined and approved operational and safety envelopes, such as energy, maximum circulating beam

319

1Office of Headquarters Operations Office of Headquarters Operations  

E-Print Network (OSTI)

· Initially, the needs assessment will be piloted across organizations within the Office of HQ Operations across all organizations at NASA HQ later in the year #12;16 Assessment P Assessment · HQ Web Site Redesign/Event and Meeting Services · Pandemic Preparedness · New Employees

320

Defense Waste Processing Facility -- Radioactive operations -- Part 3 -- Remote operations  

SciTech Connect

The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, South Carolina is the nation`s first and world`s largest vitrification facility. Following a ten year construction period and nearly three years of non-radioactive testing, the DWPF began radioactive operations in March 1996. Radioactive glass is poured from the joule heated melter into the stainless steel canisters. The canisters are then temporarily sealed, decontaminated, resistance welded for final closure, and transported to an interim storage facility. All of these operations are conducted remotely with equipment specially designed for these processes. This paper reviews canister processing during the first nine months of radioactive operations at DWPF. The fundamental design consideration for DWPF remote canister processing and handling equipment are discussed as well as interim canister storage.

Barnes, W.M.; Kerley, W.D.; Hughes, P.D.

1997-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

BEVATRON OPERATION AND DEVELOPMENT. XXXIII. Period Covered February- April 1962  

DOE Green Energy (OSTI)

Experimental work consisted of one new run started and completed this quarter, and the completion of one of the three continuing runs. Of the scheduled operating time, the beam was on for 69.4% of the time, 2.3% of the time was used for experimental setup, and equipment outage took 29.3% of the time. There were two scheduled and two impromptu shutdowns. During one of the scheduled shutdowns the external-beam extraction magnets were installed in the east and south tangent tanks. The other scheduled shutdown was to readjust the Bevatron magnet elevation to correct for foundation subsidence. Internal magnets were also installed. In the new linac development program the ion source was run at 480 kv with a beam current of 100 ma. The linac tank was partially deplated to provide a clean copper surface, and welds and holes were plated with copper. The r-f losses were thereby reduced 20%. (auth)

Crebbin, K.C.; Wenzel, W.A.; Lothrop, F.H.G.; Johnson, R.M.

1963-02-12T23:59:59.000Z

322

Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. [Forbes Substation  

SciTech Connect

This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company's (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP's original amendment request remain valid.

Not Available

1992-10-01T23:59:59.000Z

323

Long-Term Surveillance Operations and Maintenance Fiscal Year 2013 Year-End Summary Report  

Energy.gov (U.S. Department of Energy (DOE))

LTS–O&M is at the core of LM efforts to fulfill a strategy that includes objectives published in the 2011–2020 Strategic Plan (DOE 2011).

324

Aggregation operators for fuzzy ontologies  

Science Conference Proceedings (OSTI)

Fuzzy ontologies extend classical ontologies to allow the representation of imprecise and vague knowledge. Although a relatively important amount of work has been carried out in the field during the last years and they have been successfully used in ... Keywords: Aggregation operators, Fuzzy Description Logics, Fuzzy integrals, Fuzzy ontologies, Logic for the Semantic Web

Fernando Bobillo, Umberto Straccia

2013-09-01T23:59:59.000Z

325

Photovoltaics Overview: Fiscal Year 2001  

DOE Green Energy (OSTI)

In Fiscal Year 2001, for the third year in a row, the solar electric market grew at more than 30%. Fueling this growth is the U.S. photovoltaic industry - the companies that design, manufacture, install, operate, and maintain all components of solar generating systems. The messages of the U.S. PV industry roadmap are taken very seriously by the U.S. Department of Energy's Office of Solar Energy Technologies. Achieving industry's goals will demand aggressive work in fundamental and exploratory research, manufacturing, and system applications to reduce the cost of solar electric systems. This is an annual report of the DOE PV Program, FY2001.

Not Available

2002-02-01T23:59:59.000Z

326

Telecommunications in Russia: evolution over 20 years  

Science Conference Proceedings (OSTI)

This paper analyses and reviews the rapid transformation of Russian telecommunications and internet operators over the past 20 years, from small town phone service suppliers, to top-10 ranking amongst global players, on its way to adopt electronic finance. ...

L-F. Pau

2013-01-01T23:59:59.000Z

327

GARS Operations Newsletter G  

NLE Websites -- All DOE Office Websites (Extended Search)

1 1 GARS Operations Newsletter G l o b a l a n d R e g i o n a l S o l u t i o n s D i r e c t o r a t e V OLUME 2 , ISSUE 1 Safety Solutions and Pollution Prevention Proposals Congratulations to Barbara Roland of the Nonproliferation and National Security Dept.! Barbara's Safety Solution proposal has been funded. To improve personnel safety in Building 197 during emergency situations, she suggested that pathway markers be positioned on the hallway walls to help locate the Indoor Assembly Areas and Evacuation routes. Light mo- tion detectors for "common areas" in several of our buildings was also funded. This idea sprung from a suggestion received during our Director- ate Safety Stand Down in 2009. This will improve safety and conserve energy too. Remember to send us your suggestions for next year!

328

WMAP First Year Results  

E-Print Network (OSTI)

The Wilkinson Microwave Anisotropy Probe (WMAP) science team has released results from the first year of operation at the Earth-Sun L2 Lagrange point. The maps are consistent with previous observations but have much better sensitivity and angular resolution than the COBE DMR maps, and much better calibration accuracy and sky coverage than ground-based and balloon-borne experiments. The angular power spectra from these ground-based and balloon-borne experiments are consistent within their systematic and statistical uncertainties with the WMAP results. WMAP detected the large angular-scale correlation between the temperature and polarization anisotropies of the CMB caused by electron scattering since the Universe became reionized after the "Dark Ages", giving a value for the electron scattering optical depth of 0.17+/-0.04. The simplest Lambda-CDM model with n=1 and Omega_tot=1 provides an adequate fit to the WMAP data and gives parameters which are consistent with determinations of the Hubble constant and observations of the accelerating Universe using supernovae. The time-ordered data, maps, and power spectra from WMAP can be found at http://lambda.gsfc.nasa.gov along with 13 papers by the WMAP science team describing the results in detail.

E. L. Wright

2003-06-05T23:59:59.000Z

329

Uncertain generalized aggregation operators  

Science Conference Proceedings (OSTI)

The aim of this paper is to extend the generalized ordered weighted averaging operator and provide a new class of operators called the uncertain generalized ordered weighted averaging (UGOWA) operator. It provides a very general formulation that includes ... Keywords: Aggregation, Decision making, Generalized mean, OWA operator, Operator weights

Li-Gang Zhou; Hua-You Chen; José M. Merigó; Anna M. Gil-Lafuente

2012-01-01T23:59:59.000Z

330

Modulation and SSR tests performed on the BPA 500 kV thyristor controlled series capacitor unit at Slatt substation  

SciTech Connect

Field experience is reported for a thyristor controlled series capacitor (TCSC) recently commissioned at BPA`s Slatt substation. Subsynchronous resonance tests show that TCSC interactions with shaft dynamics of PGE`s Boardman steam generator are well understood and are effectively avoided by normal TCSC valve firing logic. Modulation tests, performed with the Boardman plant off line, show that the TCSC can be a powerful and responsive actuator for swing damping. Security considerations did not permit lightly damped operation of the controlled plant. Close analysis indicates that the TCSC damping contribution, though small, was measurable. The best estimate is that damping for the McNary mode is 7.33% and 8.55%, for the TCSC damper loop open and closed respectively. TCSC testing and monitoring is facilitated by an advanced interactive measurement network representing BPA`s approach to the information requirements of major control systems.

Hauer, J.F. [Pacific Northwest Lab., Richland, WA (United States); Mittelstadt, W.A. [Bonneville Power Administration, Portland, OR (United States); Piwko, R.J. [General Electric Co., Schenectady, NY (United States); Damsky, B.L. [Electric Power Research Inst., Palo Alto, CA (United States); Eden, J.D. [Portland General Electric, OR (United States)

1996-05-01T23:59:59.000Z

331

New Switches for Utility-Scale Inverters: First In-Class Demonstration of a Completely New Type of SiC Bipolar Switch (15kV-20kV) for Utility-Scale Inverters  

Science Conference Proceedings (OSTI)

Solar ADEPT Project: The SiCLAB is developing a new power switch for utility-scale PV inverters that would improve the performance and significantly reduce the size, weight, and energy loss of PV systems. A power switch controls the electrical energy flowing through an inverter, which takes the electrical current from a PV solar panel and converts it into the type and amount of electricity that is compatible with the electric grid. SiCLAB is using silicon carbide (SiC) semiconductors in its new power switches, which are more efficient than the silicon semiconductors used to conduct electricity in most conventional power switches today. Switches with SiC semiconductors can operate at much higher temperatures, as well as higher voltage and power levels than silicon switches. SiC-based power switches are also smaller than those made with silicon alone, so they result in much smaller and lighter electrical devices. In addition to their use in utility-scale PV inverters, SiCLAB’s new power switches can also be used in wind turbines, railways, and other smart grid applications.

None

2011-12-31T23:59:59.000Z

332

Heat Transfer Operators Associated with Quantum Operations  

E-Print Network (OSTI)

Any quantum operation applied on a physical system is performed as a unitary transformation on a larger extended system. If the extension used is a heat bath in thermal equilibrium, the concomitant change in the state of the bath necessarily implies a heat exchange with it. The dependence of the average heat transferred to the bath on the initial state of the system can then be found from the expectation value of a hermitian operator, which is named as the heat transfer operator (HTO). The purpose of this article is the investigation of the relation between the HTOs and the associated quantum operations. Since, any given quantum operation on a system can be realized by different baths and unitaries, many different HTOs are possible for each quantum operation. On the other hand, there are also strong restrictions on the HTOs which arise from the unitarity of the transformations. The most important of these is the Landauer erasure principle. This article is concerned with the question of finding a complete set of restrictions on the HTOs that are associated with a given quantum operation. An answer to this question has been found only for a subset of quantum operations. For erasure operations, these characterizations are equivalent to the generalized Landauer erasure principle. For the case of generic quantum operations however, it appears that the HTOs obey further restrictions which cannot be obtained from the entropic restrictions of the generalized Landauer erasure principle.

Ç. Aksak; S. Turgut

2010-02-03T23:59:59.000Z

333

Air Carrier Flight Operations  

E-Print Network (OSTI)

Most air carriers operate under a system of prioritized goals including safety, customer service (on-time departures and arrivals) and operating economics. The flight operations department is responsible for the safe and ...

Midkif, Alan H.

334

A conserved Parity Operator  

E-Print Network (OSTI)

The symmetry of Nature under a Space Inversion is described by a Parity operator. Contrary to popular belief, the Parity operator is not unique. The choice of the Parity operator requires several arbitrary decisions to be made. It is shown that alternative, equally plausible, choices leads to the definition of a Parity operator that is conserved by the Weak Interactions. The operator commonly known as CP is a more appropriate choice for a Parity operator.

Mark J Hadley

2004-06-24T23:59:59.000Z

335

Operating Experience Summaries  

NLE Websites -- All DOE Office Websites (Extended Search)

Operating Experience Summaries The Office of Health, Safety and Security (HSS) Office of Analysis publishes the Operating Experience Summary to exchange lessons-learned information...

336

Training new operators - the first six months  

Science Conference Proceedings (OSTI)

The Fermilab Operations Department takes about two years to train a new Operator. The Operator's introductory (Concepts) On-the-Job-Training (OJT) gives him or her an overview of the laboratory, teaches the basic facts about all the accelerators, and it also teaches the new operator the training process used for all the rest of their OJT training. The Concepts OJT takes about four to six months for most people to complete. This paper will explain how this first six months of training sets the new employee on their path to becoming a fully trained Operator.

Worthel, B.; /Fermilab

2010-04-01T23:59:59.000Z

337

Operator pencil passing through a given operator  

E-Print Network (OSTI)

Let $\\Delta$ be a linear differential operator acting on the space of densities of a given weight $\\lo$ on a manifold $M$. One can consider a pencil of operators $\\hPi(\\Delta)=\\{\\Delta_\\l\\}$ passing through the operator $\\Delta$ such that any $\\Delta_\\l$ is a linear differential operator acting on densities of weight $\\l$. This pencil can be identified with a linear differential operator $\\hD$ acting on the algebra of densities of all weights. The existence of an invariant scalar product in the algebra of densities implies a natural decomposition of operators, i.e. pencils of self-adjoint and anti-self-adjoint operators. We study lifting maps that are on one hand equivariant with respect to divergenceless vector fields, and, on the other hand, with values in self-adjoint or anti-self-adjoint operators. In particular we analyze the relation between these two concepts, and apply it to the study of $\\diff(M)$-equivariant liftings. Finally we briefly consider the case of liftings equivariant with respect to the algebra of projective transformations and describe all regular self-adjoint and anti-self-adjoint liftings.

A. Biggs; H. M. Khudaverdian

2013-01-28T23:59:59.000Z

338

John C. Barnes of Savannah River Operations named 2012 Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

John C. Barnes of Savannah River Operations named 2012 Facility John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year August 20, 2013 - 8:27am Addthis John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year About 200 Department of Energy (DOE) federal employees are Facility Representatives (FR) who provide day-to-day oversight of contractor operations at DOE facilities. Each year the Department presents the FR of the Year Award to recognize superior service. Mr. John C. Barnes from the Savannah River Operations Office was selected from a field of sixteen nominees as the 2012 DOE FR of the Year. He is responsible for operational oversight of key facilities at the Savannah River Site, including the F and

339

NIST: Methane Symmetry Operations  

Science Conference Proceedings (OSTI)

*. Bookmark and Share. Version History Methane Symmetry Operations. JT Hougen Optical Technology Division Gloria Wiersma ...

2010-10-05T23:59:59.000Z

340

ARM - SGP Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Operations SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Operations Routine Operations SGP central facility offices. SGP central facility offices. The overwhelming majority of the measurements with the highest priority, on which the existing experimental designs are based, are regular routine observations, as specified in the ARM Program Plan, 1990 (U.S. Department of Energy 1990). Scientifically and logistically, routine operations also serve as the basis and background for all nonroutine operations, including

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Recovery Act Funding Leads to Record Year for Transuranic Waste...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of American Recovery and Reinvestment Act funding, the Waste Isolation Pilot Plant (WIPP) received the most transuranic waste shipments in a single year since waste operations...

342

Twenty Years of Airborne Research at the University of Washington  

Science Conference Proceedings (OSTI)

Wherein is revealed the trials, tribulations, and triumphs of operating an aircraft for atmospheric research at a university over the past 20 years.

Peter V. Hobbs

1991-11-01T23:59:59.000Z

343

Integrating Equipment Health Information Into Grid Operations  

Science Conference Proceedings (OSTI)

In recent years, grid operators have expressed keen interest in having equipment health information available in real time. The health status of critical power system equipment can help operators assess situations, identify associated risks, and develop mitigation strategies/solutions in a time frame commensurate with the risk level. Health status information can also help operators recognize potential failures and take proactive actions, such as unloading a transformer or breaker that has shown signs of...

2011-12-21T23:59:59.000Z

344

Centennial - Postwar Years  

Science Conference Proceedings (OSTI)

... valuable in the operation of nuclear reactors and in ... A small device called an omegatron was developed ... 1953 Pioneering Modular Electronics. ...

2010-04-05T23:59:59.000Z

345

2009 Reporting Year  

U.S. Energy Information Administration (EIA)

FRS Accumu- Book Value Year End Year's Foot Line # Gross Lated DD&A Net Additions DD&A of Disposals Other Balance Additions Other note Petroleum: A BCD E F G H IJ

346

Operating Efficiency Comes From Teamwork  

E-Print Network (OSTI)

A group of operating and planning personnel formed the INter Plant Utilities Team [INPUT] to improve energy efficiency and reliability for Exxon's Baytown, Texas, refinery and chemical plants complex. The Team coordinates the day-to-day operations of the Site's utilities generation and distribution systems, which cross the operating boundaries of all three of the plants in the complex, and supports both capital improvements and long-term energy optimization projects for those systems. INPUTs origins go back to the early 1980's, when a utility coordination team was organized to manage the interplay of the Site's several high-level steam systems, and to reduce the impact of occasional steam shortages on the operations of both Refinery and Chemical Plant. Three years ago the current team was formed to find ways to make the systems more efficient and reliable, and to pave the way for the Site's cogeneration expansion. INPUT provides a regular forum for surfacing and resolving issues that affect the economics and reliability of the Site's utility systems, and is a commitment on the part of the three Plants at the Site to work together for the overall benefit of the Site --a commitment worth over $5,000,000 annually in operating cost savings.

Relyea, D. L.; Stone, A.

1997-04-01T23:59:59.000Z

347

The AROME-France Convective-Scale Operational Model  

Science Conference Proceedings (OSTI)

After six years of scientific, technical developments and meteorological validation, the Application of Research to Operations at Mesoscale (AROME-France) convective-scale model became operational at Météo-France at the end of 2008. This paper ...

Y. Seity; P. Brousseau; S. Malardel; G. Hello; P. Bénard; F. Bouttier; C. Lac; V. Masson

2011-03-01T23:59:59.000Z

348

A Unified Operating System for Clouds and Manycore: fos  

E-Print Network (OSTI)

Single chip processors with thousands of cores will be available in the next ten years and clouds of multicore processors afford the operating system designer thousands of cores today. Constructing operating systems for ...

Modzelewski, Kevin

2009-11-20T23:59:59.000Z

349

RHIC Polarized proton operation  

DOE Green Energy (OSTI)

The Relativistic Heavy Ion Collider (RHIC) operation as the polarized proton collider presents unique challenges since both luminosity(L) and spin polarization(P) are important. With longitudinally polarized beams at the experiments, the figure of merit is LP{sup 4}. A lot of upgrades and modifications have been made since last polarized proton operation. A 9 MHz rf system is installed to improve longitudinal match at injection and to increase luminosity. The beam dump was upgraded to increase bunch intensity. A vertical survey of RHIC was performed before the run to get better magnet alignment. The orbit control is also improved this year. Additional efforts are put in to improve source polarization and AGS polarization transfer efficiency. To preserve polarization on the ramp, a new working point is chosen such that the vertical tune is near a third order resonance. The overview of the changes and the operation results are presented in this paper. Siberian snakes are essential tools to preserve polarization when accelerating polarized beams to higher energy. At the same time, the higher order resonances still can cause polarization loss. As seen in RHIC, the betatron tune has to be carefully set and maintained on the ramp and during the store to avoid polarization loss. In addition, the orbit control is also critical to preserve polarization. The higher polarization during this run comes from several improvements over last run. First we have a much better orbit on the ramp. The orbit feedback brings down the vertical rms orbit error to 0.1mm, much better than the 0.5mm last run. With correct BPM offset and vertical realignment, this rms orbit error is indeed small. Second, the jump quads in the AGS improved input polarization for RHIC. Third, the vertical tune was pushed further away from 7/10 snake resonance. The tune feedback maintained the tune at the desired value through the ramp. To calibrate the analyzing power of RHIC polarimeters at any energy above injection, the polarized hydrogen jet target runs for every fill with both beams. Based on the known analyzing power, there is very little polarization loss between injection and 100 GeV. An alternative way is to measure the asymmetry at 100 GeV followed by ramping up to 250 GeV and back down to 100 GeV and then to measure the asymmetry again at 100 GeV. If the asymmetry after the down ramp is similar to the measurement before the up ramp, polarization was also preserved during the ramp to 250 GeV. The analyzing power at storage energy can then be extracted from the asymmetries measured at 100 GeV and 250 GeV. The tune and orbit feedbacks are essential for the down ramp to be possible. The polarized proton operation is still going on. We will push bunch intensity higher until reaching the beam-beam limit. The even higher intensity will have to wait for the electron lenses to compensate the beam-beam effect. To understand the details of spin dynamics in RHIC with two snakes, spin simulation with the real magnet fields have been developed recently. The study will provide guidance for possible polarization loss schemes. Further polarization gain will requires a polarized source upgrade; more careful setup jump quads in the AGS to get full benefit; and control emittance in the whole accelerator chain.

Huang, H.; Ahrens, L.; Alekseev, I.G.; Aschenauer, E.; Atoian, G.; Bai, M.; Bazilevsky, A.; Blaskiewicz, M.; Brennan, J.M.; Brown, K.A.; Bruno, D.; Connolly, R.; Dion, A.; D'Ottavio, T.; Drees, K.A.; Fischer, W.; Gardner, C.; Glenn, J.W.; Gu, X.; Harvey, M.; Hayes, T.; Hoff, L.; Hulsart, R.L.; Laster, J.; Liu, C.; Luo, Y.; MacKay, W.W.; Makdisi, Y.; Marr, G.J.; Marusic, A.; Meot, F.; Mernick, K.; Michnoff, R,; Minty, M.; Montag, C.; Morris, J.; Nemesure, S.; Poblaguev, A.; Ptitsyn, V.; Ranjibar, V.; Robert-Demolaize, G.; Roser, T.; J.; Severino, F.; Schmidke, B.; Schoefer, V.; Severino, F.; Smirnov, D.; Smith, K.; Steski, D.; Svirida, D.; Tepikian, S.; Trbojevic, D.; Tsoupas, N.; Tuozzolo, J. Wang, G.; Wilinski, M.; Yip, K.; Zaltsman, A.; Zelenski, A.; Zeno, K.; Zhang, S.Y.

2011-03-28T23:59:59.000Z

350

CONDUCT OF OPERATIONS (CO)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONDUCT OF OPERATIONS (CO) CONDUCT OF OPERATIONS (CO) OBJECTIVE TA-55 SST Facility NNSA ORR Implementation Plan 1 1 CO.1 The formality and discipline of operations is adequate to conduct work safely and programs are inplace to maintain this formality and discipline. (Core Requirement 13) Criteria 1. Programmatic elements of conduct of operations are in place for TA-55 SST operations. 2. The TA-55 SST operations personnel adequately demonstrate the principles of conduct ofoperations requirements during the shift performance period. Approach Record Reviews: Review procedures and other facility documents to verify compliance with conduct of operations principles. Interviews: Interview a sampling of the TA-55 SST associated personnel to validate their understanding of the conduct of operations principles (e.g., procedure usage,

351

Transforming Commercial Building Operations  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transforming Commercial Building Operations Transforming Commercial Building Operations Transforming Commercial Building Operations Ron Underhill Pacific Northwest National Laboratory ronald.underhill@pnnl.gov (509)375-9765 April 4, 2013 2 | Building Technologies Office eere.energy.gov * Most buildings are not commissioned (Cx) before occupancy, including HVAC and lighting systems * Buildings often are poorly operated and maintained leading to significant energy waste of 5 to 20%, even when they have building automation systems (BASs)

352

NSLS Operations & Engineering  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations & Engineering Electrical Equipment Controls & Diagnostics Computer Systems Power Systems Mechanical Design Mechanical Tech Utilities Vacuum Work Planning & Controls...

353

Transforming Commercial Building Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Transforming Commercial Building Operations Transforming Commercial Building Operations Transforming Commercial Building Operations Ron Underhill Pacific Northwest National Laboratory ronald.underhill@pnnl.gov (509)375-9765 April 4, 2013 2 | Building Technologies Office eere.energy.gov * Most buildings are not commissioned (Cx) before occupancy, including HVAC and lighting systems * Buildings often are poorly operated and maintained leading to significant energy waste of 5 to 20%, even when they have building automation systems (BASs)

354

Operating Procedures and Control  

Science Conference Proceedings (OSTI)

...The principal operating variables are: Distance from inner cone of oxy-fuel gas flames or from air-fuel

355

Furnace Design and Operation  

Science Conference Proceedings (OSTI)

...S. Lampman, Energy-Efficient Heat-Treating Furnace Design and Operation, Heat Treating, Vol 4, ASM Handbook, ASM International,

356

Nuclear Maintenance Applications Center: Repair and Reconditioning Specification Guidance for AC Squirrel-Cage and Salient Pole Sync hronous Motors with Voltage Ratings of 2.3 to 13.2 kV: Revision 1 of 1000897  

Science Conference Proceedings (OSTI)

The power industry is experiencing a loss of expertise as the workforce ages and some work is being outsourced to specialty suppliers. Many of the major electric motors in plants were also beginning to experience aging effects. To assist with obtaining proper motor service, EPRI published Report 1000897, Repair and Reconditioning Specification for AC Squirrel-Cage Motors with Voltage Ratings of 2.3 to 13.2 kV in 2000.

2008-12-18T23:59:59.000Z

357

Allocation Year Rollover  

NLE Websites -- All DOE Office Websites (Extended Search)

Allocation Year Rollover Allocation Year Rollover Allocation Year Rollover: 2013 to 2014 Note: Allocation Year 2013 (AY13) ends at 23:59:59 on Monday, January 13, 2014. AY14 runs from Tuesday, January 14, 2014 through Monday, January 12, 2015. Below are major changes that will go into effect with the beginning of AY14 on Tuesday, January 14, 2014. All times listed are PST. Scheduled System Downtimes There will be no service disruption during the allocation year rollover this year. Interactive and batch use will continue uninterrupted (except for "premium" jobs on Hopper; see below). Charging Across AY Boundary All batch jobs will continue running during the rollover. Time accrued before midnight will be charged to AY13 repos; time accrued after midnight will be charged to AY14 repos. Running batch jobs that are associated with

358

Wavelet based analysis of circuit breaker operation  

E-Print Network (OSTI)

Circuit breaker is an important interrupting device in power system network. It usually has a lifetime about 20 to 40 years. During breaker's service time, maintenance and inspection are imperative duties to achieve its reliable operation. To automate the diagnostic practice for circuit breaker operation and reduce the utility company's workload, Wavelet based analysis software of circuit breaker operation is developed here. Combined with circuit breaker monitoring system, the analysis software processes the original circuit breaker information, speeds up the analysis time and provides stable and consistent evaluation for the circuit breaker operation.

Ren, Zhifang Jennifer

2006-05-01T23:59:59.000Z

359

The design, construction, and operation of long-distance high-voltage electricity transmission technologies.  

SciTech Connect

This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these conductors at a safe distance from each other and from the ground and the natural and built environment. Common elements that are generally less visible (or at least more easily overlooked) include the maintained ROW along the path of the towers, access roads needed for maintenance, and staging areas used for initial construction that may be restored after construction is complete. Also visible but less common elements along the corridor may include switching stations or substations, where lines of similar or different voltages meet to transfer power.

Molburg, J. C.; Kavicky, J. A.; Picel, K. C.

2008-03-03T23:59:59.000Z

360

MATTERS IDENTIFIED AT THE OAK RIDGE OPERATIONS OFFICE DURING...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marketing Administration Other Agencies You are here Home MATTERS IDENTIFIED AT THE OAK RIDGE OPERATIONS OFFICE DURING THE AUDIT OF THE DEPARTMENT'S CONSOLIDATEDFISCAL YEAR...

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Fiscal year 1987 program plan  

SciTech Connect

The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of Operations and R D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years.

1986-12-01T23:59:59.000Z

362

From US NAVY Mate to Division Leader for Operations - Requirements, Development and Career Paths of LANL/LANSCE Accelerator Operators  

SciTech Connect

There are opportunities for advancement within the team. Operators advance by: (1) Becoming fully qualified - following the LANSCE Accelerator Operator Training Manual, Operator trainees go through 5 levels of qualification, from Radiation Security System to Experimental Area Operator. Must obtain Knowledge and Performance checkouts by an OSS or AOSS, and an End-of-Card checkout by the team leader or RSS engineer (level I). Program was inspired by US NAVY qualification program for nuclear reactor operators. Time to complete: 2-2.5 years. (2) Fully qualified operators are eligible to apply for vacant (OSS)/AOSS positions; and (3) Alternatively, experienced operators can sign up for the voluntary Senior Operator Qualification Program. They must demonstrate in-depth knowledge of all areas of the accelerator complex. Time to complete is 2-3 years (Minimum 4 years from fully qualified). Eligible for promotion to level between qualified operator and AOSS.

Spickermann, Thomas [Los Alamos National Laboratory

2012-07-26T23:59:59.000Z

363

Circuit breaker operation and potential failure modes during an earthquake  

Science Conference Proceedings (OSTI)

This study addresses the effect of a strong-motion earthquake on circuit breaker operation. It focuses on the loss of offsite power (LOSP) transient caused by a strong-motion earthquake at the Zion Nuclear Power Plant. This paper also describes the operator action necessary to prevent core melt if the above circuit breaker failure modes occur simultaneously on three 4.16 KV buses. Numerous circuit breakers important to plant safety, such as circuit breakers to diesel generators and engineered safety systems (ESS), must open and/or close during this transient while strong motion is occurring. Potential seismically-induced circuit-breaker failures modes were uncovered while the study was conducted. These failure modes include: circuit breaker fails to close; circuit breaker trips inadvertently; circuit breaker fails to reclose after trip. The causes of these failure modes include: Relay chatter causes the circuit breaker to trip; Relay chatter causes anti-pumping relays to seal-in which prevents automatic closure of circuit breakers; Load sequencer failures. The incorporation of these failure modes as well as other instrumentation and control failures into a limited scope seismic probabilistic risk assessment is also discussed in this paper.

Lambert, H.E.; Budnitz, R.J.

1987-01-01T23:59:59.000Z

364

FIVE-YEAR FINANCIAL OUTLOOK  

E-Print Network (OSTI)

Outlook) for the City of San Diego which presented a comprehensive examination of the City’s long range fiscal condition. The Financial Outlook has proven to be an important planning tool for the City of San Diego. The Outlook guided the City in establishing the fiscal year 2008 annual budget and has served throughout the year as the basis for longer term fiscal decisionmaking. The Outlook has communicated the City’s fiscal priorities along with the City’s strengths and the challenges that remain in achieving a balanced General Fund budget and fiscal health. The updated Five-Year Financial Outlook (2009-2013 Outlook) includes revised revenue and expenditure projections for fiscal years 2009 through 2013 as well as additional fiscal commitments that have emerged since the 2008-2012 Outlook was issued. Similar to the 2008-2012 Outlook, the revised revenue and expenditure estimates in the 2009-2013 Outlook are based on a variety of assumptions in the context of current and projected economic conditions. The updated Outlook not only identifies revenue and expenditure trends but also discusses risks and opportunities that affect fiscal decisions and the City’s ability to accomplish its strategic goals over the next five-year period. Those goals include: • Preservation of City services to the fullest extent possible. Fund the operations of new public facilities. • Meet contractual obligations and fund mandated programs. • Contribute the full payment of the Annual Required Contribution (ARC) for the City’s pension system. • Establish and maintain adequate General Fund reserves according to City Charter Section 91 and the City Reserve Policy recently approved by the City Council. • Address other significant financial obligations with a longer-term strategy.

Jerry Sanders; Jay M. Goldstone

2006-01-01T23:59:59.000Z

365

YEAR 2 BIOMASS UTILIZATION  

DOE Green Energy (OSTI)

This Energy & Environmental Research Center (EERC) Year 2 Biomass Utilization Final Technical Report summarizes multiple projects in biopower or bioenergy, transportation biofuels, and bioproducts. A prototype of a novel advanced power system, termed the high-temperature air furnace (HITAF), was tested for performance while converting biomass and coal blends to energy. Three biomass fuels--wood residue or hog fuel, corn stover, and switchgrass--and Wyoming subbituminous coal were acquired for combustion tests in the 3-million-Btu/hr system. Blend levels were 20% biomass--80% coal on a heat basis. Hog fuel was prepared for the upcoming combustion test by air-drying and processing through a hammer mill and screen. A K-Tron biomass feeder capable of operating in both gravimetric and volumetric modes was selected as the HITAF feed system. Two oxide dispersion-strengthened (ODS) alloys that would be used in the HITAF high-temperature heat exchanger were tested for slag corrosion rates. An alumina layer formed on one particular alloy, which was more corrosion-resistant than a chromia layer that formed on the other alloy. Research activities were completed in the development of an atmospheric pressure, fluidized-bed pyrolysis-type system called the controlled spontaneous reactor (CSR), which is used to process and condition biomass. Tree trimmings were physically and chemically altered by the CSR process, resulting in a fuel that was very suitable for feeding into a coal combustion or gasification system with little or no feed system modifications required. Experimental procedures were successful for producing hydrogen from biomass using the bacteria Thermotoga, a deep-ocean thermal vent organism. Analytical procedures for hydrogen were evaluated, a gas chromatography (GC) method was derived for measuring hydrogen yields, and adaptation culturing and protocols for mutagenesis were initiated to better develop strains that can use biomass cellulose. Fly ash derived from cofiring coal with waste paper, sunflower hulls, and wood waste showed a broad spectrum of chemical and physical characteristics, according to American Society for Testing and Materials (ASTM) C618 procedures. Higher-than-normal levels of magnesium, sodium, and potassium oxide were observed for the biomass-coal fly ash, which may impact utilization in cement replacement in concrete under ASTM requirements. Other niche markets for biomass-derived fly ash were explored. Research was conducted to develop/optimize a catalytic partial oxidation-based concept for a simple, low-cost fuel processor (reformer). Work progressed to evaluate the effects of temperature and denaturant on ethanol catalytic partial oxidation. A catalyst was isolated that had a yield of 24 mole percent, with catalyst coking limited to less than 15% over a period of 2 hours. In biodiesel research, conversion of vegetable oils to biodiesel using an alternative alkaline catalyst was demonstrated without the need for subsequent water washing. In work related to biorefinery technologies, a continuous-flow reactor was used to react ethanol with lactic acid prepared from an ammonium lactate concentrate produced in fermentations conducted at the EERC. Good yields of ester were obtained even though the concentration of lactic acid in the feed was low with respect to the amount of water present. Esterification gave lower yields of ester, owing to the lowered lactic acid content of the feed. All lactic acid fermentation from amylose hydrolysate test trials was completed. Management activities included a decision to extend several projects to December 31, 2003, because of delays in receiving biomass feedstocks for testing and acquisition of commercial matching funds. In strategic studies, methods for producing acetate esters for high-value fibers, fuel additives, solvents, and chemical intermediates were discussed with several commercial entities. Commercial industries have an interest in efficient biomass gasification designs but are waiting for economic incentives. Utility, biorefinery, pulp and paper, or o

Christopher J. Zygarlicke

2004-11-01T23:59:59.000Z

366

10-Year Outlook Executive Summary  

E-Print Network (OSTI)

The provincial government?s plan to phase out coal?fired generation in favour of cleaner forms of generation represents one of the most significant undertakings in the 100?year history of Ontario?s electricity sector. Aging generation facilities and the continued increase in demand for electricity add to the urgency of proceeding with new generating and transmission facilities over the next 10 years. Over the last 12 months 650 MW of new gas?fired generation has been put in place and 515 MW of nuclear generation and 370 MW of renewable generation is expected to be in service within the next 18 months. There are also a number of projects totalling more than 9,000 MW of additional capacity that are in various stages of discussion, development or negotiation. Timely progress to achieve this additional capacity must continue if Ontario is to ensure a reliable supply of electricity over the next decade and beyond. This 10?year Outlook from the Independent Electricity System Operator (IESO) provides an assessment of the demand?supply picture for the province over the next decade and provides a plan identifying the timing and requirements of system changes needed to meet the government’s coal shutdown timeframe. Under the provisions of Bill 100, the Ontario Power

unknown authors

2005-01-01T23:59:59.000Z

367

Applied Science and Technology Task Order Fiscal Year 2009 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End...

368

Applied Science and Technology Task Order Fiscal Year 2010 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End...

369

Applied Science and Technology Task Order Fiscal Year 2011 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End...

370

Applied Science and Technology Task Order Fiscal Year 2008 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End...

371

Baldrige Award Winners Beat the S&P 500 for Eighth Year  

Science Conference Proceedings (OSTI)

... The five-year study showed these firms improved in many areas including stock price return, operating income and sales. ...

2012-12-13T23:59:59.000Z

372

Operating Procedures Guideline  

Science Conference Proceedings (OSTI)

The intention of this report is to provide guidance for generating stations’ management and personnel striving for successful methods of developing effective operating procedures. Standard operating procedure management is used in most businesses and industries to assist in the safe and efficient operation of those companies. Effectively managing the program is essential in order to comply with mandatory regulations, maintain the highest possible level of plant integrity, minimize human ...

2012-12-12T23:59:59.000Z

373

Operations Cost Allocation Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Consolidation Project Operations Consolidation Project Operations Consolidation Project (OCP) Cost Allocation Presentation - September 20, 2011 OCP Cost Allocation Customer Presentation List of Acronyms OCP Cost Allocation Spreadsheets OCP Cost Allocation Customer Presentation - Questions and Answers - September 19 - 20, 2011 Additional Questions and Answers Customer Comments/Questions and Answers: Arizona Municipal Power Users Association Arizona Power Authority Central Arizona Project Colorado River Commission Colorado River Energy Distributors Association City of Gilbert, AZ Irrigation and Electrical Districts Association of Arizona Town of Marana, AZ City of Mesa, AZ Town of Wickenburg, AZ Western's Final Decision Regarding the Long-Term Cost Allocation Methodology for Operations Staff Costs

374

Pipeline Operations Program (Louisiana)  

Energy.gov (U.S. Department of Energy (DOE))

The Pipeline Operations Program regulates the construction, acquisition, abandonment and interconnection of natural gas pipelines, as well as, the transportation and use of natural gas supplies.

375

Bevalac Operations, 1989  

Science Conference Proceedings (OSTI)

This report discusses the following topics in relation to the Bevalac accelerator: accelerator technology operations summary; nuclear science; biomedical research; and publications and presentations.

Not Available

1990-06-01T23:59:59.000Z

376

SERIES B: Operations Research  

E-Print Network (OSTI)

Tokyo Institute of Technology. SERIES B: Operations ... Department of Computer Science, The University of Electro-Communications,. Chofugaoka, Chofu-Shi ...

377

Operating Oak Ridge's "Calutrons"  

NLE Websites -- All DOE Office Websites (Extended Search)

Operating Oak Ridge's "Calutrons" The following Oral History is taken from The Manhattan Project - The Birth of the Atomic Bomb in the Words of Its Creators, Eyewitnesses, and...

378

HQ - Human Resources Operations  

Energy.gov (U.S. Department of Energy (DOE))

HQs Human Recources Operations delivers services, including position management, recruitment, staffing and classification, and reduction in force at Headquarters.  Click the "Contacts" Link to find...

379

Operating Conditions Opportunity  

NLE Websites -- All DOE Office Websites (Extended Search)

Components in Aggressive Operating Conditions Opportunity Research is active on the patent-pending technology, titled "3-Dimensional Functionally Gradient Coatings for...

380

The Emergency Response Operations  

Science Conference Proceedings (OSTI)

... ICS Incident Command System ... Trade Center Disaster: The Con Ed Substation in World ... operations, FDNY, NYPD, and fire ground positioning of ...

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Chemistry Department Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Procedures (c). Laser Safety Information: (d). Chemistry Department Laser Safety Guidelines Operational Work Planning (a). Training waiver (b). Staff Shop Posting Local...

382

Previous Year Awards  

NLE Websites -- All DOE Office Websites (Extended Search)

Awards Awards Previous Year Awards 2013 Allocation Awards This page lists the allocation awards for NERSC for the 2013 allocation year (Jan 8, 2013 through Jan 13, 2014). Read More » NERSC Initiative for Scientific Exploration (NISE) 2013 Awards NISE is a mechanism used for allocating the NERSC reserve (10% of the total allocation). In 2013 we made the second year of the two-year awards made in 2012, supplemented by projects selected by the NERSC director. Read More » Data Intensive Computing Pilot Program 2012/2013 Awards NERSC's new data-intensive science pilot program is aimed at helping scientists capture, analyze and store the increasing stream of scientific data coming out of experiments, simulations and instruments. Read More » 2012 Allocation Awards This page lists the allocation awards for NERSC for the 2012 allocation

383

Welcome Year in Review  

National Nuclear Security Administration (NNSA)

1 NMMSS Users Annual Training Meeting Orlando, Florida-May 23-25, 2006 Sponsored by the U.S. Department of Energy & the U.S. Nuclear Regulatory Commission Welcome & Year In Review...

384

10-Year Outlook Executive Summary  

E-Print Network (OSTI)

Ontario’s electricity system faces significant challenges over the next 10 years. The uncertainty surrounding the return to service of Pickering A nuclear units, the lack of new generation investment and the commitment to shut down 7,500 MW of coal fired generation by December 31, 2007, all contribute to a potentially severe shortfall. New transmission, supply and demand side initiatives are urgently needed to address this gap and secure Ontario’s energy future. The need is most pressing in the Toronto area, to deal with the immediate impact of the April 30, 2005 shutdown of the Lakeview Thermal Generating Station. Plans are being implemented to address this in the short term. In the longer term, additional generation is also required in the Toronto area to replace the Lakeview generating capacity and to meet load growth in the Greater Toronto Area (GTA). Each year the Independent Electricity Market Operator (IMO) publishes an integrated assessment of the security and adequacy of the Ontario electricity system over the next 10 years. This report presents the IMO assessment for the 10-year period from 2005 to 2014. It is based on the IMO’s forecast of electricity demand, information provided by Ontario generators on the supply that will be available and the latest information on the configuration and capability of the transmission system. Electricity Supply Outlook Additional Ontario electricity supply and demand-side measures are required to maintain supply adequacy into the future and to reduce Ontario’s dependency on supply from other jurisdictions.

unknown authors

2005-01-01T23:59:59.000Z

385

Operating Practices Guidebook (OPG)  

Science Conference Proceedings (OSTI)

This guidebook is a summary of current practices concerning operation, maintenance, siting, and staffing of combustion turbine, combined cycle, and cogeneration equipment. Information obtained from both utility and independent generators addresses the important issues faced by operators, project planners, and business managers.

1995-05-12T23:59:59.000Z

386

Cloud Computing Operations Research  

Science Conference Proceedings (OSTI)

This paper argues that the cloud computing industry faces many decision problems where operations research OR could add tremendous value. To this end, we provide an OR perspective on cloud computing in three ways. First, we compare the cloud computing ... Keywords: cloud IT, cloud computing, green IT, operations research, supply chain

Ilyas Iyoob, Emrah Zarifoglu, A. B. Dieker

2013-06-01T23:59:59.000Z

387

CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Y-12 Enriched Uranium Operations Oxide Conversion Facility CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide Conversion Facility January 2005 A section of...

388

Top 100 Operators: Proved Reserves and Production, Operated vs ...  

U.S. Energy Information Administration (EIA)

Top 100 Operators: Proved Reserves and Production, Operated vs Owned, 2008 . The operator of an oil or gas field is the company responsible for the field’s ...

389

Agency Improvement Plan For Fiscal Year 2006 and Fiscal Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Improvement Plan For Fiscal Year 2006 and Fiscal Year 2007 More Documents & Publications U.S> Department of Energy, Fiscal Year 2007 Buy American Act Report. Audit Report:...

390

Plant Operational Status - Pantex Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

Status Plant Operational Status Page Content Operational Status Shift 1 - Day The Pantex Plant is open for normal operations. All personnel are to report for duty according to...

391

Environmental monitoring report for Calendar Year 1986  

Science Conference Proceedings (OSTI)

The results of the 1986 environmental monitoring program for the Princeton Plasma Physics Laboratory (PPPL) are presented and discussed. Two of three large tokamak machines, the Princeton Large Torus (PLT) and the Tokamak Fusion Test Reactor (TFTR) were in operation during the year. The Princeton Beta Experiment (PBX) was shut down in December 1985 to undergo major modifications, and will recommence operations in 1987. PLT was shut down in December 1986. In addition, the S-1 Spheromak and the Radio-Frequency Test Facility (RFTF) were operated on a limited basis in 1986. The Environmental Committee became a standing committee of the Executive Safety Board (ESB) and continued to review items of environmental importance. During CY86 no adverse effects to the environment or public resulted from any operational program activities at PPPL, and the Laboratory was in compliance with all applicable federal, state, and local environmental regulations.

Stencel, J.R.

1987-05-01T23:59:59.000Z

392

Quantum Operation Time Reversal  

E-Print Network (OSTI)

The dynamics of an open quantum system can be described by a quantum operation, a linear, complete positive map of operators. Here, I exhibit a compact expression for the time reversal of a quantum operation, which is closely analogous to the time reversal of a classical Markov transition matrix. Since open quantum dynamics are stochastic, and not, in general, deterministic, the time reversal is not, in general, an inversion of the dynamics. Rather, the system relaxes towards equilibrium in both the forward and reverse time directions. The probability of a quantum trajectory and the conjugate, time reversed trajectory are related by the heat exchanged with the environment.

Crooks, Gavin E

2007-01-01T23:59:59.000Z

393

Quantum Operation Time Reversal  

E-Print Network (OSTI)

The dynamics of an open quantum system can be described by a quantum operation, a linear, complete positive map of operators. Here, I exhibit a compact expression for the time reversal of a quantum operation, which is closely analogous to the time reversal of a classical Markov transition matrix. Since open quantum dynamics are stochastic, and not, in general, deterministic, the time reversal is not, in general, an inversion of the dynamics. Rather, the system relaxes towards equilibrium in both the forward and reverse time directions. The probability of a quantum trajectory and the conjugate, time reversed trajectory are related by the heat exchanged with the environment.

Gavin E. Crooks

2007-06-26T23:59:59.000Z

394

PROJECTIZING AN OPERATING NUCLEAR FACILITY  

SciTech Connect

This paper will discuss the evolution of an operations-based organization to a project-based organization to facilitate successful deactivation of a major nuclear facility. It will describe the plan used for scope definition, staff reorganization, method estimation, baseline schedule development, project management training, and results of this transformation. It is a story of leadership and teamwork, pride and success. Workers at the Savannah River Site's (SRS) F Canyon Complex (FCC) started with a challenge--take all the hazardous byproducts from nearly 50 years of operations in a major, first-of-its-kind nuclear complex and safely get rid of them, leaving the facility cold, dark, dry and ready for whatever end state is ultimately determined by the United States Department of Energy (DOE). And do it in four years, with a constantly changing workforce and steadily declining funding. The goal was to reduce the overall operating staff by 93% and budget by 94%. The facilities, F Canyon and its adjoined sister, FB Line, are located at SRS, a 310-square-mile nuclear reservation near Aiken, S.C., owned by DOE and managed by Washington Group International subsidiary Washington Savannah River Company (WSRC). These facilities were supported by more than 50 surrounding buildings, whose purpose was to provide support services during operations. The radiological, chemical and industrial hazards inventory in the old buildings was significant. The historical mission at F Canyon was to extract plutonium-239 and uranium-238 from irradiated spent nuclear fuel through chemical processing. FB Line's mission included conversion of plutonium solutions into metal, characterization, stabilization and packaging, and storage of both metal and oxide forms. The plutonium metal was sent to another DOE site for use in weapons. Deactivation in F Canyon began when chemical separations activities were completed in 2002, and a cross-functional project team concept was implemented to successfully accomplish deactivation. This concept had to allow for continued operations in FB Line until 2005, while providing distinct task-oriented teams for deactivation of the FCC. Facility workers, always the most knowledgeable about any facility, were integral parts of the project team. The team defined the scope, developed a bottoms-up estimate, reorganized personnel to designated project teams, and developed a baseline schedule with about 12,000 activities. Training was implemented to prepare the facility workers to use project management tools and concepts, which were to execute the project, coordinate activities and track progress. The project budget was estimated at $579 million. The team completed F Canyon and FB Line deactivation in August 2006, four months ahead of schedule and under budget.

Adams, N

2007-07-08T23:59:59.000Z

395

Outlook: The Next Twenty Years  

E-Print Network (OSTI)

all this discussion, the outlook for the next twenty yearsLBNL-54470 OUTLOOK: THE NEXT TWENTY YEARS H. MURAYAMAUniversity of California. OUTLOOK: THE NEXT TWENTY YEARS H.

Murayama, Hitoshi

2009-01-01T23:59:59.000Z

396

Fiscal Year Justification of  

E-Print Network (OSTI)

, epidemiology, laboratory services strengthen support for state, tribal, local, and territorial public healthDEPARTMENT of HEALTH and HUMAN SERVICES Fiscal Year 2012 Justification of Estimates Justification is one of several documents that fulfill the Department of Health and Human Services` (HHS

397

Year 2000: energy enough  

SciTech Connect

The growing needs for energy in the U.S. are reviewed, and it is predicted that energy supplies will need be more than doubled by the year 2000. The solution lies in three areas: goal targeting, resource management, and timing. A no-growth economy and an economy continuing growth at an appropriate rate are two scenarios discussed. The second major area of choice in fixing energy capabilities for the year 2000 involves management of fuel resources. Shortages of oil and gas dictate that the increase in energy consumption be changed to coal and uranium, both of which are available domestically; utilization of these energy sources will mean increased electrification. It is concluded, then, that the best avenues toward ensuring a national energy supply are utilization of coal and uranium and the practice of energy conservation through greater efficiency. Timing is the third critical area of decision making that affects future energy supply. The long lead time required to bring about a change in the national energy mix is cited. Current estimates indicate that now is the time to push toward a national electricity target of at least 7500 billion kWh for the year 2000. Meeting the target means almost four times the present electricity supply, at a growth rate of about 5.7 percent per year. This target assumes a reasonable measure of energy conservation. (MCW)

Starr, C.

1976-06-01T23:59:59.000Z

398

Gas Turbine Upgrades for Enhancing Operational Flexibility  

Science Conference Proceedings (OSTI)

Over the last several years, gas turbines owners have had to adapt their operating profiles to adjust to an ever changing environment that has included a dramatic run-up in gas prices, the halt (or collapse) of deregulation efforts in regions of the United States, the bankruptcy or near bankruptcy of industry giants, and an overall squeeze in profitability. In recent years, these externalities have been further exacerbated by the push for renewable portfolio standards (RPS), which mandate how much energy...

2009-01-09T23:59:59.000Z

399

Cathodes - Materials and Operation  

Science Conference Proceedings (OSTI)

Feb 15, 2010 ... The increasing trend in line current over recent years has seen the erosion rate of graphitized cathode blocks also increasing, which has led to ...

400

Operations Research Analysts  

U.S. Energy Information Administration (EIA) Indexed Site

Operations Research Analysts Operations Research Analysts The U.S. Energy Information Administration (EIA) within the Department of Energy has forged a world-class information program that stresses quality, teamwork, and employee growth. In support of our program, we offer a variety of profes- sional positions, including the Operations Research Analyst, whose work is associated with the development and main- tenance of energy modeling systems. Responsibilities: Operations Research Analysts perform or participate in one or more of the following important functions: * Develop, design, perform, and document a broad range of analyses and studies involving current and projected energy pricing, production, supply, and distribution, and consumption * Using computer programming skills and knowledge of energy industries and markets, designs and develops math-

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Operational Area Monitoring Plan  

Office of Legacy Management (LM)

' ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan for the DOE Field Office, Nevada (DOEINV) nuclear and non- nuclear testing activities associated with the Nevada Test Site (NTS). These Operational Area Monitoring Plans are prepared by various DOE support contractors, NTS user organizations, and federal or state agencies supporting DOE NTS operations. These plans and the parent

402

CH Packaging Operations Manual  

Science Conference Proceedings (OSTI)

This procedure provides instructions for assembling the CH Packaging Drum payload assembly, Standard Waste Box (SWB) assembly, Abnormal Operations and ICV and OCV Preshipment Leakage Rate Tests on the packaging seals, using a nondestructive Helium (He) Leak Test.

Washington TRU Solutions LLC

2005-06-13T23:59:59.000Z

403

Oak Ridge Operations YTO  

Office of Legacy Management (LM)

ed States Government Department of Energy Oak Ridge Operations YTO r , , EM-93:Hartman I - CATEGORICAL EXCLUSION (CX) DETERMINATION - RMOVAL ACTION AT M E SPRINGDALE r SITE I -a...

404

Idaho Operations Office  

NLE Websites -- All DOE Office Websites (Extended Search)

TFA-0404) (OM-PA-I0- 062) Dear Mr. Berman: This is a revised final response from the Idaho Operations Office (DOE-ID), regarding your July 22, 2010, Freedom ofInformation Act...

405

Idaho Operations Office  

NLE Websites -- All DOE Office Websites (Extended Search)

(ID-2010-01986-F) (OM-PA-I0-061) Dear Mr. Wetsch: This is in final response from the Idaho Operations Office (DOE-ID), regarding your June 2, 2010, Freedom of Information Act...

406

APS Operational Statistics  

NLE Websites -- All DOE Office Websites (Extended Search)

physics, geology, and environmental science. The APS was built by the U.S. Department of Energy as a national user facility. This page provides access to operational statistics...

407

New Switching Operator Training  

Science Conference Proceedings (OSTI)

This Technical Update report summarizes work done on a new project, launched in 2006, that is focused on the development of training materials for apprentice and new operators. The project is part of EPRI's Switching Safety and Reliability research.

2006-12-11T23:59:59.000Z

408

Cogeneration Operational Issues  

E-Print Network (OSTI)

A great deal of the discussions concerning congeneration projects are focused on the "avoided cost" and other legal issues which effect these projects. These areas are extremely important and are essential to the success of the venture. Equally important, however, are the operational Issues which impact the utility and the cogenerator. This paper addresses the utility perspective in regard to possible impact of cogeneration systems on utility service to other customer, safety and substation operations. Other operational issues also include utility transmission planning, generation planning and fuel mix decisions. All of these operational problems have an impact on the ratepayer in regard to quality of electric service and future rates. Both the cogenerator and the utility have an interest in solving these problems.

Williams, M.

1985-05-01T23:59:59.000Z

409

Oak Ridge Operations.  

Office of Legacy Management (LM)

9 4s - 22 Department of Energy Oak Ridge Operations. SI9J>liB P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director...

410

Cell Technology and Operation  

Science Conference Proceedings (OSTI)

Mar 14, 2012 ... The potlines are operating at 353 kA with excellent performances exceeding 96.0 % current efficiency and achieving 13.0 kWh/kgAl for more ...

411

Human Performance - Fossil Operations  

Science Conference Proceedings (OSTI)

All humans make errors. Industrial human errors can result in a loss of life and can significantly impact the productivity and cost effectiveness of any facility or company. Several industries in which human error has had a significant impact (for example, airline, medical, military, nuclear power, aviation, and chemical) have implemented human performance programs with excellent results. Human errors by fossil plant operators can easily challenge plant safety and production. In the fossil operations are...

2007-02-28T23:59:59.000Z

412

Through the years  

NLE Websites -- All DOE Office Websites (Extended Search)

Through the years Through the years Early 1960s Researchers at PNL (now called PNNL) developed the standards and devices for setting and measuring radiation doses received by nuclear industry work- ers. Tens of thousands of people, including children, have been mea- sured by whole-body counters since the 1960s to relate their physical content of radioactive materials to sources such as food and water. 1960s PNL formulated the first use of a digital computer for complete process control of a mass spectrometer. Mid-1960s PNL devised a computer code, called COBRA for COolant Boiling in Rod Arrays, which allowed for three-dimensional, multiphase hydrothermal modeling of reactor and other complex systems. 1967 PNL researchers continued the fundamental scientific and

413

MOTA: engineering an operator agnostic mobile service  

Science Conference Proceedings (OSTI)

There are two emerging trends in the mobile data world. First, mobile data is exploding at a rapid rate with analysts predicting 25-50X growth by the year 2015. The second trend is that users are demanding greater degree of flexibility in selecting their ... Keywords: operator agnostic

Supratim Deb; Kanthi Nagaraj; Vikram Srinivasan

2011-09-01T23:59:59.000Z

414

Operating and maintenance experience in tritium environments  

Science Conference Proceedings (OSTI)

This presentation is a summary of practical experience gained over more than twenty years from analyzing failures of process equipment operated in tritium and deuterium environments. Significant improvements have been achieved in design and procurement of new equipment, testing and selection of materials, and gradually more favorable maintenance experience. Preferred materials and inspection methods are described. 6 tabs.

Tuer, G.L.

1987-01-01T23:59:59.000Z

415

Storage Ring Operation Modes  

NLE Websites -- All DOE Office Websites (Extended Search)

Longitudinal bunch profile and Up: APS Storage Ring Parameters Longitudinal bunch profile and Up: APS Storage Ring Parameters Previous: Source Parameter Table Storage Ring Operation Modes Standard Operating Mode, top-up Fill pattern: 102 mA in 24 singlets (single bunches) with a nominal current of 4.25 mA and a spacing of 153 nanoseconds between singlets. Lattice configuration: Low emittance lattice with effective emittance of 3.1 nm-rad and coupling of 1%. Bunch length (rms): 33.5 ps. Refill schedule: Continuous top-up with single injection pulses occurring at a minimum of two minute intervals, or a multiple of two minute intervals. Special Operating Mode - 324 bunches, non top-up Fill pattern: 102 mA in 324 uniformly spaced singlets with a nominal single bunch current of 0.31 mA and a spacing of 11.37 nanoseconds between singlets.

416

Field Operations Program Activities Status Report  

Science Conference Proceedings (OSTI)

The Field Operations Program is an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed by the Idaho National Engineering and Environmental Laboratory. The Program's goals are to evaluate electric vehicles in real-world applications and environments, support electric vehicle technology advancement, develop infrastructure elements necessary to support significant electric vehicle use, support increased use of electric vehicles in federal fleets, and increase overall awareness and acceptance of electric vehicles. This report covers Program activities from fiscal year 1997 through mid-fiscal year 1999. The Field Operations Program succeeded the Site Operator Program, which ended in September 1996. Electric vehicle testing conducted by the Program includes baseline performance testing (EV America testing), accelerated reliability (life-cycle) testing, and fleet testing. The baseline performance parameters include accelerations, braking, range, energy efficiency, and charging time. The Program collects accelerated reliability and fleet operations data on electric vehicles operated by the Program's Qualified Vehicle Testing (QVT) partners. The Program's QVT partners have over 3 million miles of electric vehicle operating experience.

J. E. Francfort; D. V. O'Hara; L. A. Slezak

1999-05-01T23:59:59.000Z

417

Paducah Plant Begins Enrichment Operations after Five Parties Strike  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plant Begins Enrichment Operations after Five Parties Plant Begins Enrichment Operations after Five Parties Strike Agreement Paducah Plant Begins Enrichment Operations after Five Parties Strike Agreement May 1, 2012 - 12:00pm Addthis This cylinder hauler at Paducah’s Babcock & Wilcox Conversion Services plant delivers the first of DOE’s 14-ton depleted uranium cylinders to USEC for re-enrichment as part of a five-party agreement that is extending enrichment operations at the 60-year-old plant for another year, delaying increased costs at the site for DOE. This cylinder hauler at Paducah's Babcock & Wilcox Conversion Services plant delivers the first of DOE's 14-ton depleted uranium cylinders to USEC for re-enrichment as part of a five-party agreement that is extending enrichment operations at the 60-year-old plant for another year, delaying

418

Facility Representative Program: Facility Representative of the Year  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility Representative of the Year Award Facility Representative of the Year Award Annual Facility Representative Workshop Facility Representative of the Year Award Process Facility Representative of the Year Award 2012 WINNER: John C. Barnes, Savannah River Operations Office Letter from DNFSB Chairman Peter S. Winokur, Ph.D 2012 Nominees: Peter W. Kelley, Brookhaven Site Office James E. Garza, Idaho Operations Office (EM) William R. Watson, Idaho Operations Office (NE) Darlene S. Rodriguez, Los Alamos Field Office Robert R. Robb, Livermore Field Office Kenneth W. Wethington, Grand Junction Project Office's Moab site Thomas P. Denny, Nevada Field Office Michael J. Childers, NNSA Production Office Pantex Site Catherine T. Schidel, NNSA Production Office Y12 Site Chelsea D. Hubbard, Oak Ridge Operations Office (EM)

419

Applications: Operational wind turbines  

E-Print Network (OSTI)

Capability Applications: Operational wind turbines Benefits: Optimize wind turbine performance Summary: Researchers at the Los Alamos National Laboratory (LANL) Intelligent Wind Turbine Program are developing a multi-physics modeling approach for the analysis of wind turbines in the presence of realistic

420

REACTOR OPERATIONS AND CONTROL  

E-Print Network (OSTI)

of Neural Networks to the Operations of Nuclear Power Plants," Nucl. Safety, 32, 68 ~1991!. 3. I. PÁZSIT detectors.1 According to the technical specifications of the Ring- hals power plant, in which this work and the "distorted" axial flux shape, and from the latter, *Current address: The Swedish Nuclear Power Inspectorate

Pázsit, Imre

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

NUCLEAR PLANT OPERATIONS AND  

E-Print Network (OSTI)

NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: neutron flux, cur- rent noise, vibration diagnostics: Swedish Nuclear Power Inspectorate SE- 10658 Stockholm, Sweden. NUCLEAR TECHNOLOGY VOL. 131 AUG. 2000 239 by the Swedish Nuclear Power Inspectorate, contract 14.5-980942-98242. REFERENCES 1. A. M. WEINBERG and H. C

Pázsit, Imre

422

Operator strength reduction  

Science Conference Proceedings (OSTI)

Operator strength reduction is a technique that improves compiler-generated code by reformulating certain costly computations in terms of less expensive ones. A common case arises in array addressing expressions used in loops. The compiler can replace ... Keywords: loops, static single assignment form, strength reduction

Keith D. Cooper; L. Taylor Simpson; Christopher A. Vick

2001-09-01T23:59:59.000Z

423

Designing intelligent healthcare operations  

Science Conference Proceedings (OSTI)

Effective decision making is vital in all healthcare activities. While this decision making is typically complex and unstructured, it requires the decision maker to gather multi-spectral data and information in order to make an effective choice when ... Keywords: healthcare operations, intelligence continuum, knowledge management, multi agent systems

Nilmini Wickramasinghe; Christian Guttmann; Jonathan Schaffer

2009-12-01T23:59:59.000Z

424

Quantum Operations and Measurement  

E-Print Network (OSTI)

Quantum Operations and Measurement M.P Seevinck E-mail: M.P.Seevinck@phys.uu.nl Utrecht field in quantum physics ­ or perhaps better, a new way of doing quantum physics ­ . . . Surprisingly of these developments to the conceptual problems of quantum mechanics. In our view, the new work on quantum information

Seevinck, Michiel

425

Quantum Operations and Measurement  

E-Print Network (OSTI)

Quantum Operations and Measurement # M.P Seevinck # E­mail: M.P.Seevinck@phys.uu.nl Utrecht in quantum physics -- or perhaps better, a new way of doing quantum physics -- . . . Surprisingly, with few to the conceptual problems of quantum mechanics. In our view, the new work on quantum information changes

Seevinck, Michiel

426

Stack Monitor Operating Experience Review  

Science Conference Proceedings (OSTI)

Stack monitors are used to sense radioactive particulates and gases in effluent air being vented from rooms of nuclear facilities. These monitors record the levels and types of effluents to the environment. This paper presents the results of a stack monitor operating experience review of the U.S. Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS) database records from the past 18 years. Regulations regarding these monitors are briefly described. Operating experiences reported by the U.S. DOE and in engineering literature sources were reviewed to determine the strengths and weaknesses of these monitors. Electrical faults, radiation instrumentation faults, and human errors are the three leading causes of failures. A representative “all modes” failure rate is 1E-04/hr. Repair time estimates vary from an average repair time of 17.5 hours (with spare parts on hand) to 160 hours (without spare parts on hand). These data should support the use of stack monitors in any nuclear facility, including the National Ignition Facility and the international ITER project.

L. C. Cadwallader; S. A. Bruyere

2009-05-01T23:59:59.000Z

427

Calendar Year 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Office of Inspector General 
1000 3 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Audit Report: OAS-FS-14-03 http://energy.gov/ig/downloads/audit-report-oas-fs-14-03 Audit Report: OAS-FS-14-03

429

Top 100 Operators: Proved Reserves and Production, Operated vs ...  

U.S. Energy Information Administration (EIA)

The operator of an oil or gas field is the company ... Operators in the United States are obligated to ... Reserves Production Reserves Production ...

430

2013 Director's New Year Address  

NLE Websites -- All DOE Office Websites (Extended Search)

Director's New Year Address 2013 Director's New Year Address Print Looking Forward and Celebrating 20 Years in 2013 falocne We recently sat down with ALS Director Roger Falcone to...

431

CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conduct of Operations - Y-12 Enriched Uranium Operations Conduct of Operations - Y-12 Enriched Uranium Operations Oxide Conversion Facility CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide Conversion Facility January 2005 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a January, 2005 assessment of Conduct of Operations program at the Y-12 - Enriched Uranium Operations Oxide Conversion Facility. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Conduct of Operations - Y-12 Enriched Uranium Operations Oxide Conversion Facility More Documents & Publications CRAD, DOE Oversight - Y-12 Enriched Uranium Operations Oxide Conversion

432

San Francisco Operations Office  

Office of Legacy Management (LM)

San Francisco Operations Office San Francisco Operations Office 1333 Broadway Oakland, California 94612 Dr. Joseph 0. Ward, Chief Radiological Health Section Department of Health Services 744 P Street Sacramento, California, 95814 SUBJECT: Certification Docket of Gilman Hall Dear Dr. Ward: The Department of Energy (DOE) has completed and reviewed the remedial ac- tions of Gilman Hall located at the University of California, Berkeley, California. Based on this review, DOE certifies that the condition of Gilman Hall is radiologically acceptable for restricted use under the con- trols of the University of California's State General License 1333-62 pro- vided that the University's Office of Environmental Health and Safety con- tinues to survey Gilman Hall and monitor whenever remodeling or renovation

433

Nevada Operations Office  

Office of Legacy Management (LM)

Nevada Operations Office Nevada Operations Office t' . 0. Box 14100, Las Vegas, NV 89114-4100 Lt. Col. Kent J. Rohlof; USAF Commander 554th Civil Engineering Support Squadron (TAC) Nellis Air Force Base, NV 89191 DISPOSAL OF LIQUID RADIOACTIVE WASTE--NELLIS AIR FORCE BASE Layton O'Neill and Thomas Graham of my office recently visited two sites at Nellis AFB, Area II, identified as locations for burial of radioactive waste. The purpose of this visit was to visually inspect the physical status of the sites, one identified as the location of the subject liquid wastes. Numerous readings were made with a hand-held Ludlum Model 125 Micro-R meter, for the purpose of personnel radiation protection walking into the controlled, posted radioactive waste compounds. No readings were above background.

434

Improve your operations training  

Science Conference Proceedings (OSTI)

Operators need problem-solving expertise that allows them to successfully restore the system online. But they should also understand how what they did worked, and why. The method for this is process logic (PL). PL is a common-sense, efficient method of problem solving using an if-them deductive-reasoning approach to discover root cause of system upsets. PL procedures in troubleshooting call for the operator to: examine all effects; separate logical (expected) changes from unexpected; identify and tag unique set(s) of thumbprints; determine source of thumbprints (i.e. originating component); locate original change in said component; verify root cause change; devise appropriate corrective action plan; and implement corrective action. Several examples illustrate this method for troubleshooting.

Swain, J.H.; Maddux, M. (K and S Associates, Texas City, TX (United States))

1994-12-01T23:59:59.000Z

435

Operations Improvement Surveys  

E-Print Network (OSTI)

Exxon Chemical Company developed unique site-wide energy optimization technology in the mid1970's. This technology was applied by means of site energy surveys which were carried out at every major Exxon facility throughout the world during the 1976-1981 timeframe. The first 20% of energy savings, versus the 1972 reference, had already been captured or was in progress via conventional energy conservation methods. The site energy surveys identified attractive investments to save a second 20% of energy use. In early 1982, Exxon Corp. started to apply this same technology to its major facilities to define attractive NO INVESTMENT and LOW INVESTMENT operational improvement savings which could be implemented quickly. This presentation covers Exxon's approach to site energy optimization and the Operations Improvement Survey Program. The Program has identified at many sites, an average of 5% reduction in today's energy costs at No/Low investment plus additional savings in the feedstock and energy supply areas.

Guide, J. J.; O'Brien, W. J.

1984-01-01T23:59:59.000Z

436

SURVEY OF FALLOUT OPERATIONS  

SciTech Connect

A survey was made of fall-out operations in the various countries of the world, These operations are outlined by country. The source of information has largely been the reports submitted to UNSCEAR forwarding data for their consideration. In addition, some material has been received directly in exchange for HASL Quarterlies and other publications of the Laboratory. In many cases, responsible scientists from the country concerned have reviewed the sheets and have made corrections. All of the programs that are shown have been and are subject to modification as time goes on, thus, the data indicate the status of the program as of 1961. No attempt has been made to list re search projects or special fall-out measurements and only programs of a continuing nature have been covered. (auth)

1962-07-01T23:59:59.000Z

437

User Operation Manual  

NLE Websites -- All DOE Office Websites (Extended Search)

SNS-NSSD-TOF-TD-0002 - R00 SNS-NSSD-TOF-TD-0002 - R00 1 SEQUOIA Operations Manual for Users G.E. Granroth SEQUOIA Lead Instrument Scientist A.I. Kolesnikov SEQUOIA Instrument Scientist L.M. DeBeer-Schmitt SEQUOIA Scientific Associate T.E. Sherline Sample Environment Scientist Revised - May 13, 2013 SNS-NSSD-TOF-TD-0002 - R00 2 Abstract The SEQUOIA Operations Manual for Users presents a description of the SEQUOIA spectrometer located at beamline 17 (BL17) of the Spallation Neutron Source (SNS). It is the intent of this manual to inform the user regarding the SEQUOIA spectrometer and available sample environment, to run experiments, to access and analyze the collected data, and to provide the user with other potentially useful information. The first section serves to describe the components of which the instrument is comprised.

438

War Gaming Peace Operations  

Science Conference Proceedings (OSTI)

Today's military personnel fight against and work with a diverse variety of nonstate actors, from al-Qaeda terrorists to major nongovernmental organizations who provide vital humanitarian assistance. Furthermore, the nontraditional battle spaces where ... Keywords: Afghanistan, NGOs, active learning, board game, course of action, culture, curriculum, facilitator, faith-based, humanitarian, humanitarian assistance, indeterminacy, index, intelligence, kinetic, military, negotiations, operations, post-conflict, provincial reconstruction, random events, relationships, religion, religious, stability, terrorists, war game for peace

Roger Mason, Eric Patterson

2013-02-01T23:59:59.000Z

439

Climate Data Operators (CDO)  

NLE Websites -- All DOE Office Websites (Extended Search)

Climate Climate Data Operators (CDO) Climate Data Operators (CDO) Description and Overview CDO is a large tool set for working on climate data. NetCDF 3/4, GRIB including SZIP compression, EXTRA, SERVICE and IEG are supported as IO-formats. Apart from that cdo can be used to analyse any kind gridded data not related to climate science. CDO has very small memory requirements and can process files larger than the physical memory. How to Use CDO module load cdo cdo [Options] Operators ... Further Information CDO Online Documentation Availability Package Platform Category Version Module Install Date Date Made Default cdo carver libraries/ I/O 1.4.1 cdo/1.4.1 2012-01-13 2012-01-13 cdo carver libraries/ I/O 1.4.6 cdo/1.4.6 2012-05-24 2012-05-25 cdo carver libraries/ I/O 1.6.1 cdo/1.6.1 2013-07-02

440

Operational health physics training  

SciTech Connect

The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of {alpha}, {beta}, {gamma}, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included.

NONE

1992-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Operated device estimation framework  

E-Print Network (OSTI)

Protective device estimation is a challenging task because there are numerous protective devices present in a typical distribution system. Among various protective devices, auto-reclosers and fuses are the main overcurrent protection on distribution systems. Operation of a protective device in response to a particular fault condition depends upon the protective device’s operating behavior and coordination of various such protective devices. This thesis presents the design and implementation of a protective device estimation algorithm which helps in identifying which protective devices have operated to clear a short circuit condition. The algorithm uses manufacturer’s device details, power quality data measured from substation monitoring devices and power system event features estimated using existing DFA algorithms. The proposed technique can be used to evaluate coordination of these protective devices and helps in locating a fault in a distribution system feeder. This approach is independent of feeder topology and could be readily used for any distribution system. The effectiveness of this algorithm is verified by simulated and actual test data. Suggestions are included for future research and application by electric utilities.

Rengarajan, Janarthanan

2008-12-01T23:59:59.000Z

442

Executive Director for Operations RENEWAL OF FULL-POWER OPERATING LICENSE FOR PILGRIM NUCLEAR POWER STATION  

E-Print Network (OSTI)

This paper (1) requests that the Commission authorize the Director of the Office of Nuclear Reactor Regulation (NRR) to renew the operating license for Pilgrim Nuclear Power Station (PNPS) for an additional 20 years, and (2) informs the Commission of the results of the U.S. Nuclear Regulatory Commission (NRC) staff’s review of the PNPS license renewal application (LRA) (Ref. 1) submitted by Entergy Nuclear Generation Company (Entergy Nuclear) and Entergy Nuclear Operations, Inc. (ENO) (owner and operator, respectively, of PNPS). In the Staff Requirements Memorandum for SECY-02-0088, “Turkey Point Nuclear Plant, Units 3 and

R. W. Borchardt

2012-01-01T23:59:59.000Z

443

Design Evolution Study Thermal Operating Methodology  

Science Conference Proceedings (OSTI)

This study provides results supporting the conclusion that the repository can be operated over a varying range of thermal modes and therefore temperatures. In particular, this work focused on limiting the peak, postclosure waste package surface temperature to less than 85 degrees Celsius, a possible limit due to corrosion considerations. These operating modes were compared by varying the waste package in drift spacing (0.1-2.83 meters), drift pitch (drift spacing centerline to centerline of 40-120 meters), ventilation duration (75-300 years), and ventilation efficiency (50-80%). The resulting graphical representation shows where the constant temperature of the waste package (85 degrees Celsius) lies with respect to drift pitch and waste package spacing. The waste considered in this study is the strict youngest fuel first 5 years old fuel. Using only strict youngest fuel first 5 years old fuel in the waste stream results in an average heat load per waste package of 12.48kW/Pkg. With this high average heat load, it is not possible to achieve a maximum waste package surface temperature of 85 degrees Celsius or less. By aging 63% of the strict youngest fuel first 5 years old fuel for 27 years, it becomes possible to maintain the waste package surface temperature at 85 degrees Celsius or less. The 27 years of aging comes from the fact that the repository could be closed in as little as 50 years. It takes 23 years to emplace the waste and therefore the last fuel received for emplacement is 27 years prior to closures. The strict youngest fuel first 5 years old fuel waste stream with 63% aged for 27 years, results in an average power level of 8.4kW/Pkg. This lower heat load allows the controlled parameters of drift pitch, waste package spacing, aging, and ventilation duration to be varied to achieve the desired results. This study compares the hot strict youngest fuel first 5 years old fuel to the previous waste stream, which has an average of 26-year-old fuel. The 26-year-old fuel waste stream has an average power level of 7.2 kW/Pkg. This comparison illustrated how the parameters important to thermal performance differ for these two assumptions about the waste stream.

T.L. Mitchell

2002-04-29T23:59:59.000Z

444

Residential Commercial Industrial Year  

Gasoline and Diesel Fuel Update (EIA)

4 4 Residential Commercial Industrial Year and State Volume (million cubic feet) Consumers Volume (million cubic feet) Consumers Volume (million cubic feet) Consumers 2000 Total ................... 4,996,179 59,252,728 3,182,469 5,010,817 8,142,240 220,251 2001 Total ................... 4,771,340 60,286,364 3,022,712 4,996,446 7,344,219 217,026 2002 Total ................... 4,888,816 61,107,254 3,144,169 5,064,384 7,507,180 205,915 2003 Total ................... R 5,079,351 R 61,871,450 R 3,179,493 R 5,152,177 R 7,150,396 R 205,514 2004 Total ................... 4,884,521 62,469,142 3,141,653 5,135,985 7,250,634 212,191 Alabama ...................... 43,842 806,175 26,418 65,040 169,135 2,800 Alaska.......................... 18,200 104,360 18,373 13,999 46,580 10 Arizona ........................

445

HEV Fleet Testing Operating Statistics  

NLE Websites -- All DOE Office Websites (Extended Search)

calculated for this figure using mass air flow over dynamic vehicle operation. 2006 Toyota Highlander Hybrid Final Fleet Testing Results Operating Performance Cumulative MPG 1 :...

446

HEV Fleet Testing Operating Statistics  

NLE Websites -- All DOE Office Websites (Extended Search)

calculated for this figure using mass air flow over dynamic vehicle operation. 2007 Toyota Camry Hybrid Final Fleet Testing Results Operating Performance Cumulative MPG 1 : 33.6...

447

What is an accelerator operator?  

NLE Websites -- All DOE Office Websites (Extended Search)

is an accelerator operator? First I'll explain the education one must have in order to be considered for an Accelerator Operator position. Jefferson Lab's typical Accelerator...

448

702AZ aging waste ventilation facility year 2000 test procedure  

SciTech Connect

This test procedure was developed to determine if the 702AZ Tank Ventilation Facility system is Year 2000 Compliant. The procedure provides detailed instructions for performing the operations necessary and documenting the results. This verification procedure will document that the 702AZ Facility Systems are year 2000 compliant and will correctly meet the criteria established in this procedure.

Winkelman, W.D.

1998-07-22T23:59:59.000Z

449

Projects of the year  

SciTech Connect

The Peabody Hotel, Orlando, Florida was the site of Power Engineering magazine's 2006 Projects of the Year Awards Banquet, which kicked-off the Power-Gen International conference and exhibition. The Best Coal-fired Project was awarded to Tri-State Generation and Transmission Association Inc., owner of Springenville Unit 3. This is a 400 MW pulverized coal plant in Springeville, AZ, sited with two existing coal-fired units. Designed to fire Powder River Basin coal, it has low NOx burners and selective catalytic reduction for NOx control, dry flue gas desulfurization for SO{sub 2} control and a pulse jet baghouse for particulate control. It has a seven-stage feedwater heater and condensers to ensure maximum performance. Progress Energy-Carolinas' Asheville Power Station FGD and SCR Project was awarded the 2006 coal-fired Project Honorable Mention. This plant in Skyland, NC was required to significantly reduce NOx emissions. When completed, the improvements will reduce NOx by 93% compared to 1996 levels and SO{sub 2} by 93% compared to 2001 levels. Awards for best gas-fired, nuclear, and renewable/sustainable energy projects are recorded. The Sasyadko Coal-Mine Methane Cogeneration Plant near Donezk, Ukraine, was given the 2006 Honorable Mention for Best Renewable/Sustainable Energy Project. In November 2004, Ukraine was among 14 nations to launch the Methane to Markets partnership. The award-winning plant is fuelled by methane released during coal extraction. It generates 42 MW of power. 4 photos.

Hansen, T.

2007-01-15T23:59:59.000Z

450

Utility-Scale Silicon Carbide Power Transistors: 15 kV SiC IGBT Power Modules for Grid Scale Power Conversion  

SciTech Connect

ADEPT Project: Cree is developing silicon carbide (SiC) power transistors that are 50% more energy efficient than traditional transistors. Transistors act like a switch, controlling the electrical energy that flows through an electrical circuit. Most power transistors today use silicon semiconductors to conduct electricity. However, transistors with SiC semiconductors operate at much higher temperatures, as well as higher voltage and power levels than their silicon counterparts. SiC-based transistors are also smaller and require less cooling than those made with traditional silicon power technology. Cree's SiC transistors will enable electrical circuits to handle higher power levels more efficiently, and they will result in much smaller and lighter electrical devices and power converters. Cree, an established leader in SiC technology, has already released a commercially available SiC transistor that can operate at up to 1,200 volts. The company has also demonstrated a utility-scale SiC transistor that operates at up to 15,000 volts.

None

2010-09-01T23:59:59.000Z

451

Equipment Operational Requirements  

SciTech Connect

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

2009-06-11T23:59:59.000Z

452

IBRD Operational Decision Framework  

SciTech Connect

The IBRD Operational Decision Framework in this document is an expansion of an emerging general risk management framework under development by an interagency working group. It provides the level of detail necessary to develop a general Consequence Management Guidance Document for biological contamination remediation and restoration. It is the intent of this document to support both wide area and individual site remediation and restoration activities. This product was initiated as a portion of the IBRD Task 1 Systems Analysis to aid in identification of wide area remediation and restoration shortcomings and gaps. The draft interagency general risk management framework was used as the basis for the analysis. The initial Task 1 analysis document expanded the draft interagency framework to a higher level of resolution, building on both the logic structure and the accompanying text explanations. It was then employed in a qualitative manner to identify responsible agencies, data requirements, tool requirements, and current capabilities for each decision and task. This resulted in identifying shortcomings and gaps needing resolution. Several meetings of a joint LLNL/SNL working group reviewed and approved the initial content of this analysis. At the conclusion of Task 1, work continued on the expanded framework to generate this Operational Decision Framework which is consistent with the existing interagency general risk management framework. A large LLNL task group met repeatedly over a three-month period to develop the expanded framework, coordinate the framework with the biological remediation checklist, and synchronize the logic with the Consequence Management Plan table of contents. The expanded framework was briefed at a large table top exercise reviewing the interagency risk management framework. This exercise had representation from major US metropolitan areas as well as national agencies. This product received positive comments from the participants. Upon completion of the Operational Decision Framework, another joint LLNL/SNL working group conducted a day-long review. Identified modifications were made to the document, resulting in the included product.

Greenwalt, R; Hibbard, W; Raber, E; Carlsen, T; Folks, K; MacQueen, D; Mancieri, S; Bunt, T; Richards, J; Hirabayashi-Dethier, J

2010-11-12T23:59:59.000Z

453

U.S. Percent Utilization of Refinery Operable Capacity (Percent)  

U.S. Energy Information Administration (EIA)

Annual : Download Data (XLS File) U.S. Percent Utilization of Refinery Operable Capacity (Percent) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec; 1985: 74.0 ...

454

AUDIT REPORT REPORT ON MATTERS IDENTIFIED AT THE IDAHO OPERATIONS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

REPORT ON MATTERS IDENTIFIED AT THE IDAHO OPERATIONS OFFICE DURING THE AUDIT OF THE DEPARTMENT'S CONSOLIDATED FISCAL YEAR 1998 FINANCIAL STATEMENTS, WR-FS-99-01 AUDIT REPORT REPORT...

455

SLIC: an extensibility system for commodity operating systems  

Science Conference Proceedings (OSTI)

Modern commodity operating systems are large and complex systems developed over many years by large teams of programmers, containing hundreds of thousands of lines of code. Consequently, it is extremely difficult to add significant new functionality ...

Douglas P. Ghormley; David Petrou; Steven H. Rodrigues; Thomas E. Anderson

1998-06-01T23:59:59.000Z

456

Gulf Coast (PADD 3) Operable Crude Oil Distillation Capacity ...  

U.S. Energy Information Administration (EIA)

Gulf Coast (PADD 3) Operable Crude Oil Distillation Capacity (Thousand Barrels per Calendar Day) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec; 1985: 7,172 ...

457

U. S. Operating Crude Oil Distillation Capacity (Thousand Barrels ...  

U.S. Energy Information Administration (EIA)

U. S. Operating Crude Oil Distillation Capacity (Thousand Barrels per Day) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec; 1985: 14,361: 14,293: 14,268: 14,605 ...

458

U. S. Operable Crude Oil Distillation Capacity (Thousand Barrels ...  

U.S. Energy Information Administration (EIA)

U. S. Operable Crude Oil Distillation Capacity (Thousand Barrels per Calendar Day) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec; 1985: 15,659: 15,559: 15,582 ...

459

Proposed amendment to presidential permit PP-63 and associated modifications to 500 kV international transmission line, Forbes, Minnesota to Manitoba, Canada. Addendum to the final environmental assessment  

SciTech Connect

This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

Not Available

1992-10-01T23:59:59.000Z

460

Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500-kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada, Northern States Power Company. Addendum to the final Environmental Assessment  

SciTech Connect

This Addendum to the Final Environmental Assessment for the Proposed Amendment to Presidential Permit PP-63 and Associated Modifications to 500 kV International Transmission Line: Forbes, Minnesota to Manitoba, Canada (DOE/EA-587) addresses Northern States Power Company`s (NSP) proposed expansion of the Forbes Substation. The applicant has requested that the expansion take place on the west side of the substation, within the existing property line, instead of on the north side as originally proposed. All of the proposed construction would take place on property already owned by NSP. DOE has reviewed the environmental impacts associated with this minor modification and has determined that the conclusions reached in the environmental assessment and Finding of No Significant Impact prepared in connection with NSP`s original amendment request remain valid.

Not Available

1992-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating kv year" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

EFRC: Administration and Operation  

NLE Websites -- All DOE Office Websites (Extended Search)

Mark Pederson PhD Computation and Theoretical Chemistry Office of Basic Energy Sciences Office of Science, U.S. Department of Energy Computing and Storage Requirements for Basic Energy Sciences An ASCR / BES / NERSC Workshop February 9-10, 2010 9AM OFFICE OF SCIENCE OFFICE OF SCIENCE Primary: Near Future Needs of Capacity Computing? BES has approximately 150 users requesting 50K to 4M processor hours (PU) per year. BES users use approximately 80-100M PU per year through the NERSC allocation process NERSC users span the BES core research areas, the energy frontier research centers and the "Basic Research Needs (BRN)" workshops. Role/Needs of Capacity vs Capability? OFFICE OF SCIENCE Energy and Science Grand Challenges http://www.sc.doe.gov/bes/reports/list.html

462

Parastillation Process in Operations  

E-Print Network (OSTI)

The Parastillation process is a new method for multi-stage, counter-current contact between vapor and liquid that results in 33% more ideal stages than distillation for a given tray spacing. Patents have been granted in the U.S.A., U.K., Europe and other countries. Performance of the process has been confirmed over the past several years by computer simulation, by laboratory tests and in commercial installations.

Canfield, F.; Jenkins, O.

1986-06-01T23:59:59.000Z

463

INDEPENDENT ELECTRICITY SYSTEM OPERATOR  

E-Print Network (OSTI)

The Board of Directors of the Independent Electricity System Operator (IESO) has adopted this Charter as part of its commitment to high standards of corporate governance in pursuing the objects of the IESO set out in the Electricity Act, 1998. This Charter describes the Board’s mandate, accountability and composition, and sets out a specific Code of Conduct for the Board. More detailed information about the IESO’s corporate governance is set out in the Governance and Structure By?law and in corporate policies, notably the Terms of Reference for a Director. The activities of the Board and its Committees are formally recorded in minutes of meetings. MANDATE The Board shall manage and supervise the management of the IESO’s business and affairs and shall provide insight, input into and oversight of the development of the IESO’s strategic direction. More specifically, the Board’s mandate includes: periodically reviewing with Management: the strategic environment; the emergence of new risks and opportunities and the implications of such risks and opportunities for the IESO’s strategic direction; and the establishment and operation of the IESO?administered markets to promote the purposes of the Electricity Act, 1998 including, without limitation, making market rules and amendments thereto; approving strategic plans that take into account the IESO’s major risks and opportunities and overseeing the management of those risks; 2 appointing, monitoring and assessing the performance of the Chief Executive

unknown authors

2009-01-01T23:59:59.000Z

464

Operating experience at CEBAF  

Science Conference Proceedings (OSTI)

CEBAF, the Continuous Electron Beam Accelerator Facility, is a 5-pass, recirculating, superconducting rf linac designed to provide exceptional beam quality at 4 GeV up to 200 {mu}A CW. It is made up of an injector, two 400-MeV linacs, and 9 recirculation arcs having a total beamline length of more than 4.5 km. On Nov. 5, 1995, CEBAF delivered a 4 GeV, 25-{mu}A CW electron beam to the first of 3 experimental halls and the experimental physics program was started 10 days later. Accelerator availability during the first month of the experimental run exceeded 75%. Beam properties measured in the experimental hall to date are a one sigma momentum spread of 5{times}10{sup -5} and an rms emittance of 0.2 nanometer-radians, better than design specification. CW beam has been provided from all 5 passes at 800 MeV intervals. Outstanding performance of the superconducting linacs suggests a machine energy upgrade to 6 GeV in the near term with eventual machine operation at 8-10 GeV. Results from commissioning and operations experience since the last conference are presented.

Legg, R.

1996-07-01T23:59:59.000Z

465

Extending quantum operations  

SciTech Connect

For a given set of input-output pairs of quantum states or observables, we ask the question whether there exists a physically implementable transformation that maps each of the inputs to the corresponding output. The physical maps on quantum states are trace-preserving completely positive maps, but we also consider variants of these requirements. We generalize the definition of complete positivity to linear maps defined on arbitrary subspaces, then formulate this notion as a semidefinite program, and relate it by duality to approximative extensions of this map. This gives a characterization of the maps which can be approximated arbitrarily well as the restriction of a map that is completely positive on the whole algebra, also yielding the familiar extension theorems on operator spaces. For quantum channel extensions and extensions by probabilistic operations we obtain semidefinite characterizations, and we also elucidate the special case of Abelian inputs or outputs. Finally, revisiting a theorem by Alberti and Uhlmann, we provide simpler and more widely applicable conditions for certain extension problems on qubits, and by using a semidefinite programming formulation we exhibit counterexamples to seemingly reasonable but false generalizations of the Alberti-Uhlmann theorem.

Heinosaari, Teiko [Turku Centre for Quantum Physics, Department of Physics and Astronomy, University of Turku (Finland); Jivulescu, Maria A. [Department of Mathematics, University Politehnica Timisoara, 300006 Timisoara (Romania); Reeb, David; Wolf, Michael M. [Department of Mathematics, Technische Universitaet Muenchen, 85748 Garching (Germany)

2012-10-15T23:59:59.000Z

466

Mobile marine operations structure  

SciTech Connect

This patent describes the process of installing a marine operations structure in a pre-determined sea floor location. The structure has a central core and a support base having at least two differently sloped ice wall surfaces for achieving fracturing of ice features, and having at least two series of circumferentially arranged ballast tanks. It consists of positioning the structure over a selected sea floor location by the use of at least three tug boats connected to the structure by tension cables arranged radially with respect to the structure; flooding a first series of lower ballast tanks in a sequential ballasting operation; flooding a second series of ballast tanks located at a higher elevation within the structure than the first series of ballast tanks; maintaining radial forces along the tension cables during the flooding steps; and after the structure has become founded on the bottom of the sea, pumping sea waver into fluid tanks some of which are located at an elevation above the water level.

Bhalaik, A.; Braddick, P.W.; Brittin, D.S.; Johnson, G.L.

1987-09-22T23:59:59.000Z

467

STANDARD OPERATING PROTOCOLS FOR DECOMMISSIONING  

SciTech Connect

Decommissioning projects at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites are conducted under project-specific decision documents, which involve extensive preparation time, public comment periods, and regulatory approvals. Often, the decision documents must be initiated at least one year before comme