Sample records for operating kv frcc

  1. Evaluation of first 10-kV optical ETO thyristor operating without any low-voltage control bias

    E-Print Network [OSTI]

    Mazumder, Sudip K.

    unlike any existing ETO (or even IGCT/MTO/GTO devices) is reported at 10 kV using the Silvaco TCAD suite

  2. EIS-0344: Grand Coulee-Bell 500 kV Transmission Line

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

  3. Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick

    SciTech Connect (OSTI)

    NONE

    1993-10-01T23:59:59.000Z

    This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

  4. CEBAF 200 kV Inverted Electron Gun

    SciTech Connect (OSTI)

    J.M. Grames, P.A. Adderley, J. Clark, J. Hansknecht, M. Poelker, M.L. Stutzman, R. Suleiman, K.E.L. Surles-Law

    2011-03-01T23:59:59.000Z

    Two DC high voltage GaAs photoguns have been built at Jefferson Lab based on a compact inverted insulator design. One photogun provides the polarized electron beam at CEBAF and operates at 130 kV bias voltage. The other gun is used for high average current lifetime studies at a dedicated test facility and has been operated at bias voltage up to 225 kV. The advantages of higher DC voltage for CEBAF include reduced space-charge emittance growth and the potential for prolonged photocathode lifetime. However, a consequence of operating at higher voltages is the increased likelihood of field emission or breakdown, both of which are unacceptable. Highlights of the R&D studies leading toward a production 200keV GaAs photogun for CEBAF will be presented.

  5. Design and performance of a 30 KV electron gun with ten independent cathodes & a magnetic lens.

    SciTech Connect (OSTI)

    Rudys, Joseph Matthew; Reed, Kim Warren

    2006-08-01T23:59:59.000Z

    Measurements on a 30 kV electron gun with ten independent cathodes, operating in a 6.5 Tesla (T) magnetic field are presented. An earlier paper covered the design of this electron gun [1]. Experimental results are compared to model predictions. Beam current is compared to theoretical space charge limited flow.

  6. Wild Horse 69-kV transmission line environmental assessment

    SciTech Connect (OSTI)

    NONE

    1996-12-01T23:59:59.000Z

    Hill County Electric Cooperative Inc. (Hill County) proposes to construct and operate a 69-kV transmission line from its North Gildford Substation in Montana north to the Canadian border. A vicinity project area map is enclosed as a figure. TransCanada Power Corporation (TCP), a Canadian power-marketing company, will own and construct the connecting 69-kV line from the international border to Express Pipeline`s pump station at Wild Horse, Alberta. This Environmental Assessment is prepared for the Department of Energy (DOE) as lead federal agency to comply with the requirements of the National Environmental Policy Act (NEPA), as part of DOE`s review and approval process of the applications filed by Hill County for a DOE Presidential Permit and License to Export Electricity to a foreign country. The purpose of the proposed line is to supply electric energy to a crude oil pump station in Canada, owned by Express Pipeline Ltd. (Express). The pipeline would transport Canadian-produced oil from Hardisty, Alberta, Canada, to Caster, Wyoming. The Express Pipeline is scheduled to be constructed in 1996--97 and will supply crude oil to refineries in Wyoming and the midwest.

  7. CEBAF 200 kV Inverted Electron Gun

    SciTech Connect (OSTI)

    Grames, J M; Clark, J; Hansknecht, J; Poelker, M; Stutzman, M L; Suleiman, R; Surles-Law, K.E.L.; BastaniNejad, M

    2011-03-01T23:59:59.000Z

    Two DC high volt­age GaAs pho­to­guns have been built at Jef­fer­son Lab based on a com­pact in­vert­ed in­su­la­tor de­sign. One pho­to­gun pro­vides the po­lar­ized elec­tron beam at CEBAF and op­er­ates at 130 kV bias volt­age. The other gun is used for high av­er­age cur­rent life­time stud­ies at a ded­i­cat­ed test fa­cil­i­ty and has been op­er­at­ed at bias volt­age up to 225 kV. The ad­van­tages of high­er DC volt­age for CEBAF in­clude re­duced space-charge emit­tance growth and the po­ten­tial for pro­longed pho­to­cath­ode life­time. How­ev­er, a con­se­quence of op­er­at­ing at high­er volt­ages is the in­creased like­li­hood of field emis­sion or break­down, both of which are un­ac­cept­able. High­lights of the R&D stud­ies lead­ing to­ward a pro­duc­tion 200keV GaAs pho­to­gun for CEBAF will be pre­sent­ed.

  8. A charge-pump 60kV modulator for the ISOLDE target extraction voltage

    E-Print Network [OSTI]

    Barlow, R A; Fowler, A; Gaudillet, H; Gharsa, T; Schipper, J

    2015-01-01T23:59:59.000Z

    The ISOLDE facility at CERN provides radioactive ion beams to a number of experimental stations. These ions are produced by a metal target, floating at 60 kV, which is impacted by a 1.4 GeV high intensity proton beam. The ions are then accelerated by a grounded extraction electrode to 60 keV, before transport to the experimental area. During proton beam impact extremely high ionisation of the volume around the target gives rise to significant leakage current which results in loss of charge on the effective target capacitance of approximately 6 nF. If short life-time isotopes are to be studied, the 60 kV must be re-established within a maximum of 10 ms. Recharging the target capacitance to 60 kV and to the required stability of better than 10-4 precludes a direct charging system and an alternative method of re-establishing the 60 kV is used. The present system [1], in operation since 1991, employs a resonant circuit which is triggered 35 µs prior to beam impact. This circuit transfers the charge on the effec...

  9. The varistor protected series capacitors at the 500 KV broadview substation

    SciTech Connect (OSTI)

    Barcus, J.M. (General Electric Co., Hudson Falls, NY (US)); Miske, S.A. Jr. (General Electric Co., Schenectady, NY (US)); Vitols, A.P. (General Electric Co., Pittsfield, MA (US)); Maynard, H.M. (Montana Power Co., Butte, MT (US)); Peterson, W.G. (Bonneville Power Admin., Portland, OR (US))

    1988-10-01T23:59:59.000Z

    Two 235 Mvar series capacitors have been successfully applied at the 500 kV Broadview substation of the Colstrip Transmission Project. The series capacitors have an overvoltage protection system based on metal oxide varistors. The system provides instantaneous bypass and reinsertion of the capacitors following external line section faults. The excellent performance of the equipment was demonstrated during staged fault tests performed in October, 1985. The banks have been in successful operation since January, 1986.

  10. Property:EIA/861/NercFrcc | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformationInyoCoolingTowerWaterUseSummerConsumed JumpMoverNercErcot Jump to: navigation,

  11. EA-1679: Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington

    Broader source: Energy.gov [DOE]

    This EA evaluates potential environmental impacts from the construction and operation of six new 500-kV overhead transmission lines to replace six existing underground lines at Grand Coulee Dam. DOE’s Bonneville Power Administration (BPA), a cooperating agency, was asked by the U. S. Department of the Interior’s Bureau of Reclamation to design and construct the proposed new transmission lines. A Finding of No Significant Impact was issued by BPA in December 2011.

  12. Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).

  13. Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1994-02-01T23:59:59.000Z

    The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

  14. Increasing the reliability of the shutdown of 500 - 750-kV overhead lines equipped with shunt reactors in an unsuccessful three-phase automatic repeated closure cycle

    SciTech Connect (OSTI)

    Kuz'micheva, K. I.; Merzlyakov, A. S.; Fokin, G. G. [JSC 'R and D Center at Federal Grid Company of the United Power System' (Russian Federation)

    2013-05-15T23:59:59.000Z

    The reasons for circuit-breaker failures during repeated disconnection of 500 - 750 kV overhead lines with shunt reactors in a cycle of unsuccessful three-phase automatic reconnection (TARC) are analyzed. Recommendations are made for increasing the operating reliability of power transmission lines with shunt reactors when there is unsuccessful reconnection.

  15. Blythe-Knob 161-kV Transmission Line

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScienceCareers Apply forBiosurveillance A8 Blythe-Knob 161-kV

  16. ELECTRICAL AGING OF 15 KV EPR CABLES ENERGIZED BY AC VOLTAGE WITH SWITCHING IMPULSES SUPERIMPOSED.

    E-Print Network [OSTI]

    Zanwar, Anand Umeshlal

    2011-01-01T23:59:59.000Z

    ?? In this study, the electrical aging of 15 kV Ethylene Propylene Rubber (EPR) power cables, located in PVC pipes containing water, was conducted by… (more)

  17. Optimizing the CEBAF Injector for Beam Operation with a Higher Voltage Electron Gun

    E-Print Network [OSTI]

    Hannon, F E; Kazimi, R

    2011-01-01T23:59:59.000Z

    Recent developments in the DC gun technology used at CEBAF have allowed an increase in operational voltage from 100kV to 130kV. In the near future this will be extended further to 200kV with the purchase of a new power supply. The injector components and layout at this time have been designed specifically for 100kV operation. It is anticipated that with an increase in gun voltage and optimization of the layout and components for 200kV operation, that the electron bunch length and beam brightness can be improved upon. This paper explores some upgrade possibilities for a 200kV gun CEBAF injector through beam dynamic simulations.

  18. Optimizing the CEBAF Injector for Beam Operation with a Higher Voltage Electron Gun

    SciTech Connect (OSTI)

    F.E. Hannon, A.S. Hofler, R. Kazimi

    2011-03-01T23:59:59.000Z

    Recent developments in the DC gun technology used at CEBAF have allowed an increase in operational voltage from 100kV to 130kV. In the near future this will be extended further to 200kV with the purchase of a new power supply. The injector components and layout at this time have been designed specifically for 100kV operation. It is anticipated that with an increase in gun voltage and optimization of the layout and components for 200kV operation, that the electron bunch length and beam brightness can be improved upon. This paper explores some upgrade possibilities for a 200kV gun CEBAF injector through beam dynamic simulations.

  19. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    SciTech Connect (OSTI)

    Not Available

    1992-04-01T23:59:59.000Z

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  20. Tungsten anode spectral model using interpolating cubic splines: Unfiltered x-ray spectra from 20 kV to 640 kV

    SciTech Connect (OSTI)

    Hernandez, Andrew M. [Biomedical Engineering Graduate Group, University of California Davis, Sacramento, California 95817 (United States)] [Biomedical Engineering Graduate Group, University of California Davis, Sacramento, California 95817 (United States); Boone, John M., E-mail: john.boone@ucdmc.ucdavis.edu [Departments of Radiology and Biomedical Engineering, Biomedical Engineering Graduate Group, University of California Davis, Sacramento, California 95817 (United States)

    2014-04-15T23:59:59.000Z

    Purpose: Monte Carlo methods were used to generate lightly filtered high resolution x-ray spectra spanning from 20 kV to 640 kV. Methods: X-ray spectra were simulated for a conventional tungsten anode. The Monte Carlo N-Particle eXtended radiation transport code (MCNPX 2.6.0) was used to produce 35 spectra over the tube potential range from 20 kV to 640 kV, and cubic spline interpolation procedures were used to create piecewise polynomials characterizing the photon fluence per energy bin as a function of x-ray tube potential. Using these basis spectra and the cubic spline interpolation, 621 spectra were generated at 1 kV intervals from 20 to 640 kV. The tungsten anode spectral model using interpolating cubic splines (TASMICS) produces minimally filtered (0.8 mm Be) x-ray spectra with 1 keV energy resolution. The TASMICS spectra were compared mathematically with other, previously reported spectra. Results: Using pairedt-test analyses, no statistically significant difference (i.e., p > 0.05) was observed between compared spectra over energy bins above 1% of peak bremsstrahlung fluence. For all energy bins, the correlation of determination (R{sup 2}) demonstrated good correlation for all spectral comparisons. The mean overall difference (MOD) and mean absolute difference (MAD) were computed over energy bins (above 1% of peak bremsstrahlung fluence) and over all the kV permutations compared. MOD and MAD comparisons with previously reported spectra were 2.7% and 9.7%, respectively (TASMIP), 0.1% and 12.0%, respectively [R. Birch and M. Marshall, “Computation of bremsstrahlung x-ray spectra and comparison with spectra measured with a Ge(Li) detector,” Phys. Med. Biol. 24, 505–517 (1979)], 0.4% and 8.1%, respectively (Poludniowski), and 0.4% and 8.1%, respectively (AAPM TG 195). The effective energy of TASMICS spectra with 2.5 mm of added Al filtration ranged from 17 keV (at 20 kV) to 138 keV (at 640 kV); with 0.2 mm of added Cu filtration the effective energy was 9 keV at 20 kV and 169 keV at 640 kV. Conclusions: Ranging from 20 kV to 640 kV, 621 x-ray spectra were produced and are available at 1 kV tube potential intervals. The spectra are tabulated at 1 keV intervals. TASMICS spectra were shown to be largely equivalent to published spectral models and are available in spreadsheet format for interested users by emailing the corresponding author (JMB)

  1. GENERATION OF A 5A, 10kV HOLLOW ELECTRON BEAM BY A PIERCE GUN J.J. BARROSO, P.J. CASTRO, J.O. ROSSI, J.A.N. GONALVES, and H. PATIRE JR.

    E-Print Network [OSTI]

    GENERATION OF A 5A, 10kV HOLLOW ELECTRON BEAM BY A PIERCE GUN J.J. BARROSO, P.J. CASTRO, J.O. ROSSI, the monotron is the simplest microwave generator, whose principle of operation relies on transit-time effects to accelerate and inject a hollow electron into a cylindrical cavity to generate high-power microwaves at 6

  2. 150-kV, 80-A SOLID STATE POWER SUPPLY FOR NEUTRAL BEAM INJECTION

    E-Print Network [OSTI]

    Owren, H.

    2011-01-01T23:59:59.000Z

    owned rig 150-kV, 80-A SOLID STATE POWER SUPPLY FOR NEUTRALpaper describes an all solid state power supply designed forment and arc power supplies are also solid state. With the

  3. A SCR SWITCHED CAPACITOR VOLTAGE REGULATOR FOR 150 kV NEUTRAL BEAM POWER SUPPLY

    E-Print Network [OSTI]

    Milnes, K.A.

    2011-01-01T23:59:59.000Z

    et a1. , "150-kV, 80-A Solid State Power Supply for Neutral100% solid state and provides 1% regulation at power levelssolid state high voltage re- gulator. The block diagram of the power

  4. ESS 2012 Peer Review - 15 kV Phase Leg Power Modules with SiC...

    Broader source: Energy.gov (indexed) [DOE]

    1 Click to edit Master title style 15 kV Phase Leg Power Modules with SiC MIDSJT Devices Ranbir Singh and Siddarth Sundaresan GeneSiC Semiconductor Inc. ranbir.singh@genesicsemi.co...

  5. ESS 2012 Peer Review - 6.5 kV Silicon Carbide Half-Bridge Power...

    Broader source: Energy.gov (indexed) [DOE]

    a 5 kV DC-Link voltage which will greatly impact Storage Systems by reducing costs of power conversion stages Impact current system designs as well as create a platform for...

  6. EMI (electromagnetic interference) potential of proposed 115KV line near B-691

    SciTech Connect (OSTI)

    Latorre, V.R.; Wythe, D.M.

    1989-07-27T23:59:59.000Z

    The Laser Operated Diamond Turning Machine (LODTM) is housed in Building 691. This facility contains electronic measurement and control systems which could be susceptible to interfering electromagnetic interference (EMI) generated by sources external to B-691. In particular, concern has been expressed that such harmful EMI signals could be produced by the proposed WAPA 115KV feeder line which would be routed approximately 30 feet from the East side of the facility. Also, there has been some concern expressed about the effects of the resulting electromagnetic (EM) fields on personnel in the proximity of the power line. Since it is necessary to measure the EM fields to ascertain if a hazard does indeed exist, and since we in ERD have been performing such field measurements for many years, we were contacted to determine the field levels from the line that might be expected inside and close to B-691. This report describes our approach, equipment and calibration procedures, analysis techniques used, results, and suggestions for future work in related areas. 9 refs., 41 figs.

  7. Solid-State Fault Current Limiter Development : Design and Testing Update of a 15kV SSCL Power Stack

    SciTech Connect (OSTI)

    Dr. Ram Adapa; Mr. Dante Piccone

    2012-04-30T23:59:59.000Z

    ABSTRACT The Solid-State Fault Current Limiter (SSCL) is a promising technology that can be applied to utility power delivery systems to address the problem of increasing fault currents associated with load growth. As demand continues to grow, more power is added to utility system either by increasing generator capacity or by adding distributed generators, resulting in higher available fault currents, often beyond the capabilities of the present infrastructure. The SSCL is power-electronics based equipment designed to work with the present utility system to address this problem. The SSCL monitors the line current and dynamically inserts additional impedance into the line in the event of a fault being detected. The SSCL is based on a modular design and can be configured for 5kV through 69kV systems at nominal current ratings of 1000A to 4000A. Results and Findings This report provides the final test results on the development of 15kV class SSCL single phase power stack. The scope of work included the design of the modular standard building block sub-assemblies, the design and manufacture of the power stack and the testing of the power stack for the key functional tests of continuous current capability and fault current limiting action. Challenges and Objectives Solid-State Current Limiter technology impacts a wide spectrum of utility engineering and operating personnel. It addresses the problems associated with load growth both at Transmission and Distribution class networks. The design concept is pioneering in terms of developing the most efficient and compact power electronics equipment for utility use. The initial test results of the standard building blocks are promising. The independent laboratory tests of the power stack are promising. However the complete 3 phase system needs rigorous testing for performance and reliability. Applications, Values, and Use The SSCL is an intelligent power-electronics device which is modular in design and can provide current limiting or current interrupting capabilities. It can be applied to variety of applications from distribution class to transmission class power delivery grids and networks. It can also be applied to single major commercial and industrial loads and distributed generator supplies. The active switching of devices can be further utilized for protection of substation transformers. The stress on the system can be reduced substantially improving the life of the power system. It minimizes the voltage sag by speedy elimination of heavy fault currents and promises to be an important element of the utility power system. DOE Perspective This development effort is now focused on a 15kV system. This project will help mitigate the challenges of increasing available fault current. DOE has made a major contribution in providing a cost effective SSCL designed to integrate seamlessly into the Transmission and Distribution networks of today and the future. Approach SSCL development program for a 69kV SSCL was initiated which included the use of the Super GTO advanced semiconductor device which won the 2007 R&D100 Award. In the beginning, steps were identified to accomplish the economically viable design of a 69kV class Solid State Current Limiter that is extremely reliable, cost effective, and compact enough to be applied in urban transmission. The prime thrust in design and development was to encompass the 1000A and the 3000A ratings and provide a modular design to cover the wide range of applications. The focus of the project was then shifted to a 15kV class SSCL. The specifications for the 15kV power stack are reviewed. The design changes integrated into the 15kV power stack are discussed. In this Technical Update the complete project is summarized followed by a detailed test report. The power stack independent high voltage laboratory test requirements and results are presented. Keywords Solid State Current Limiter, SSCL, Fault Current Limiter, Fault Current Controller, Power electronics controller, Intelligent power-electronics Device, IED

  8. Marys Lake 69/115-kV transmission line upgrade and substation expansion projects

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    Western Area Power Administration (Western) and the Platte River Power Authority (Platte River) propose to upgrade portions of the existing electric transmission and substation system that serves the Town of Estes Park, Colorado. The existing transmission lines between the Estes Power Plant Switchyard and the Marys Lake Substation include a 115,000 volt (115-kV) line and 69,000 volt (69-kV) line. Approximately one mile is a double-circuit 115/69-kV line on steel lattice structures, and approximately two miles consists of separate single-circuit 115-kV and a 69-kV lines, constructed on wood H-Frame structures. Both lines were constructed in 1951 by the US Bureau of Reclamation. The existing transmission lines are on rights-of-way (ROW) that vary from 75 feet to 120 feet and are owned by Western. There are 48 landowners adjacent to the existing ROW. All of the houses were built adjacent to the existing ROW after the transmission lines were constructed. Upgrading the existing 69-kV transmission line between the Marys Lake Substation and the Estes Power Plant Switchyard to 115-kV and expanding the Marys Lake Substation was identified as the most effective way in which to improve electric service to Estes Park. The primary purpose and need of the proposed project is to improve the reliability of electric service to the Town of Estes Park. Lack of reliability has been a historical concern, and reliability will always be less than desired until physical improvements are made to the electrical facilities serving Estes Park.

  9. 15-kV Single-Bias All-Optical ETO Thyristor A. Mojab and S.K. Mazumder

    E-Print Network [OSTI]

    Mazumder, Sudip K.

    15-kV Single-Bias All-Optical ETO Thyristor A. Mojab and S.K. Mazumder Laboratory for Energy 15 kV single bias and a current of 10 A. This ETO is completely controlled by two optical signals, one for the 15 kV SiC gate- turn-off (GTO) thyristor and the other one for a triggering low- voltage

  10. Development of a thyristor valve for next generation 500kV HVDC transmission systems

    SciTech Connect (OSTI)

    Hasegawa, T. [Kansai Electric Power Co., Inc., Osaka (Japan)] [Kansai Electric Power Co., Inc., Osaka (Japan); Yamaji, K. [Shikoku Electric Power Co., Inc., Takamatsu (Japan)] [Shikoku Electric Power Co., Inc., Takamatsu (Japan); Irokawa, H. [Electric Power Development Co., Ltd., Tokyo (Japan)] [Electric Power Development Co., Ltd., Tokyo (Japan); Shirahama, H.; Tanaka, C.; Akabane, K.

    1996-10-01T23:59:59.000Z

    A high voltage thyristor valve is the basic component of an HVDC transmission system. Development of a 500kV valve for next generation HVDC transmission systems is described. First, the power loss of the valve is analyzed to decide a reasonable wafer size for the light triggered thyristor. From these results, a six inch diameter wafer size is selected. The light triggered thyristor, with ratings of 8kV and 3.5kA, is developed using the six inch wafer. The designing of the valve employing the thyristor and test results with the prototype valve prove that a 500kV valve can be realized by the design method.

  11. EIS-0107: Mead-Phoenix +500-kV Direct Current Transmission Line

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration (WAPA) prepared this statement to analyze the potential environmental and socioeconomic impacts arising from WAPA and regional project sponsors’ proposal to construct a 500 kilovolt (kV) alternating current (AC) transmission line with the capability to be upgraded later to 500kV direct current (DC), connecting the Westwing Substation, located north of Phoenix, Arizona, with a new McCullough II Substation, located approximately 14 miles west of Boulder City, Nevada. This statement modifies a previously prepared federal statement from which the participants' election to proceed had not occurred at the time this statement was prepared.

  12. Consideration of 34. 5 KV as an in-plant voltage for a large industrial user

    SciTech Connect (OSTI)

    Niculescu, T.D.; Regan, R.R.

    1983-09-01T23:59:59.000Z

    Traditionally, the in-plant distribution voltage for a large refinery or petrochemical complex has been 13.8 kV. Selection of this voltage level was dictated primarily by economic factors, simply because in most cases the magnitude of the loads or the lengths of the feeders did not produce sufficient savings to compensate for the costlier higher voltage switchgear. This paper presents some engineering and cost considerations for distribution at 34.5 kV and attempts to show that this voltage level is both economically and technically feasible for large electrical systems.

  13. EA-1665: Davis-Kingman 69-kV Transmission Line Rebuild Project, Arizona

    Broader source: Energy.gov [DOE]

    Western plans to rebuild a 26.6-mile-long portion of the existing 27.3-mile-long Davis–Kingman Tap 69-kV Transmission Line within the existing ROW in order to improve the reliability of the transmission service.

  14. EA-2007: Groton-Ordway 115-kV Transmission Line, Groton, South Dakota

    Broader source: Energy.gov [DOE]

    DOE’s Western Area Power Administration (Upper Great Plains Region) is preparing an EA that assesses the potential environmental impacts of a proposal to construct a new 115-kV transmission line that would connect Western’s existing Groton and Ordway Substations near Groton, South Dakota.

  15. Plasma Immersion Ion Implantation with a 4kV/10kHz Compact High Voltage Pulser

    SciTech Connect (OSTI)

    Ueda, M.; Oliveira, R. M.; Rossi, J. O. [Associated Laboratory of Plasma, National Institute for Space Research, Av. dos Astronautas 1758, Sao Jose dos Campos, Sao Paulo (Brazil); Reuther, H. [Institute of Ion Beam Physics and Materials Research, Rossendorf, Dresden (Germany); Silva, G. [Associated Laboratory of Plasma, National Institute for Space Research, Av. dos Astronautas 1758, Sao Jose dos Campos, Sao Paulo (Brazil); Department of Aeronautics and Mechanics, Technological Institute of Aeronautics, Sao Jose dos Campos, Sao Paulo (Brazil)

    2006-11-13T23:59:59.000Z

    Development of a 4 kV/10 kHz Compact High Voltage Pulser and its application to nitrogen plasma immersion ion implantation (PIII) of different materials as Si, Al alloys, SS304 stainless steel and Ti alloys are discussed. Low voltage (1-5 kV) pulses at high frequencies (up to 20 kHz for 2 kV) were obtained with maximum power delivered at 5 kV, 7 kHz. These conditions were not sufficient to reach temperatures above 200 deg. C in the samples because of short duration of the pulses. However, very shallow implantations of nitrogen in Si, Al5052, SS304 were observed by Auger electron spectroscopy and improved corrosion resistance was obtained for Al5052 when it was treated by nitrogen PIII at 2.5 kV, 5{mu}s and 5 kHz pulses.

  16. Development of 500 kV DC PPLP-insulated oil-filled submarine cable

    SciTech Connect (OSTI)

    Fujimori, A. [Kansai Electric Power Co., Inc., Osaka (Japan)] [Kansai Electric Power Co., Inc., Osaka (Japan); Tanaka, T. [Electric Power Development Co., Ltd., Tokyo (Japan)] [Electric Power Development Co., Ltd., Tokyo (Japan); Takashima, H. [Shikoku Electric Power Co., Inc., Kagawa (Japan)] [Shikoku Electric Power Co., Inc., Kagawa (Japan); Imajo, T. [Central Research Inst. of Electric Power Industry, Tokyo (Japan)] [Central Research Inst. of Electric Power Industry, Tokyo (Japan); Hata, R. [Sumitomo Electric Industries, Ltd., Osaka (Japan)] [Sumitomo Electric Industries, Ltd., Osaka (Japan); Tanabe, T. [Furukawa Electric Co., Ltd., Tokyo (Japan)] [Furukawa Electric Co., Ltd., Tokyo (Japan); Yoshida, S. [Fujikura, Ltd., Tokyo (Japan)] [Fujikura, Ltd., Tokyo (Japan); Kakihana, T. [Hitachi Cable, Ltd., Tokyo (Japan)] [Hitachi Cable, Ltd., Tokyo (Japan)

    1996-01-01T23:59:59.000Z

    This paper outlines the development of a 500 kV DC oil-filled submarine cable capable of transmitting 2,800 MW with {+-} 500 kV 2800A bipole system. Polypropylene Laminated Paper (PPL) was employed as the insulation material, which is the worlds first application to DC cables. The conductor size is 3,000 mm{sup 2}, which is the largest size for submarine cables ever put into practical use. Through various fundamental and prototype tests, the cable proved to have excellent electrical characteristics for DC voltage as well as transient overvoltage. The cable and accessories are currently undergoing a long-term accelerated aging test as the final confirmation of their reliability and stability.

  17. Design and Overview of 100 kV Bushing for the DNB Injector of ITER

    SciTech Connect (OSTI)

    Shah, Sejal; Bandyopadhyay, M.; Rotti, C.; Singh, M. J.; Roopesh, G.; Chakraborty, A. K. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Rajesh, S. [ITER-India, Institute for Plasma Research, Gandhinagar-382025, Gujarat (India); Microelectronics and Materials Physics Labs, P.O.Box 4500, FIN-90014 University of Oulu (Finland); Nishad, S.; Srusti, B. [DesignTech Systems Ltd, Banjara Hills, Hyderabad, Andhra Pradesh-500034 (India); Schunke, B.; Hemsworth, R.; Chareyre, J.; Svensson, L. [ITER Organisation, Route de Vinon, CS 90 046, 13067 St. Paul lez Durance Cedex (France)

    2011-09-26T23:59:59.000Z

    The 100 kV bushing is one of the most important and technologically challenging Safety Important Class (SIC) components of the Diagnostic Neutral Beam (DNB) injector of ITER. It forms interface between gas insulated electrical transmission line and torus primary vacuum and acts as a vacuum feedthrough of ITER. Design optimization has been carried out to meet the electric and structural requirements based on its classification. Unlike HNB bushing, single stage bushing is designed to provide 100 kV isolation. Finite Element Analysis (FEA) based optimization has been carried out for electrostatic and structural analysis. Manufacturing assembly sequence is studied and presented in this paper. However validation of the same is foreseen from manufacturer.

  18. EIS-0365: Imperial-Mexicali 230-kV Transmission Lines

    Broader source: Energy.gov [DOE]

    On February 27, 2001, Baja California Power, Inc. (hereafter referred to as Intergen), InterGen Aztec Energy, V.B.V., filed an application with DOE, Office of Fossil Energy, for a Presidential permit that would allow construction and connection of a double-circuit, 230-kV transmission line extending from the Imperial Valley Substation in California for a distance of about 6 mi (10 km) to a point west of Calexico at the U.S.-Mexico border.

  19. A 6 kV arbitrary waveform generator for the Tevatron Electron Lens

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Pfeffer, H; Saewert, G

    2011-11-01T23:59:59.000Z

    This paper reports on a 6 kV modulator built and installed at Fermilab to drive the electron gun anode for the Tevatron Electron Lens (TEL). The TEL was built with the intention of shifting the individual (anti)proton bunch tunes to even out the tune spread among all 36 bunches with the desire of improving Tevatron integrated luminosity. This modulator is essentially a 6 kV arbitrary waveform generator that enables the TEL to define the electron beam intensity on a bunch-by-bunch basis. A voltage waveform is constructed having a 7 {micro}s duration that corresponds to the tune shift requirements of a 12-bunch (anti)proton beam pulse train. This waveform is played out for any one or all three bunch trains in the Tevatron. The programmed waveform voltages transition to different levels at time intervals corresponding to the 395 ns bunch spacing. Thus, complex voltage waveforms can be played out at a sustained rate of 143 kHz over the full 6 kV output range. This paper describes the novel design of the inductive adder topology employing five transformers. It describes the design aspects that minimize switching losses for this multi-kilovolt, high repetition rate and high duty factor application.

  20. Sidney-North Yuma 230-kV Transmission Line Project, Colorado and Nebraska

    SciTech Connect (OSTI)

    Not Available

    1991-06-01T23:59:59.000Z

    This report describes the need for a 230-kV overhead transmission line to supply power from Sidney, Nebraska to eastern Colorado. The alternative scenario compared to construction of the line is No Action. Rejected alternatives include underground lines and different routing paths, with a possible extension to the Sterling area. Both scenarios are evaluated for environmental effects, cost, and consequences for the eastern Colorado region. The proposed route is determined to be the environmentally preferred choice. 120 refs., 6 figs., 13 tabs. (MHB)

  1. Blythe-Knob 161-kV Transmission Line Cross Arm Replacements -

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScienceCareers Apply forBiosurveillance A8 Blythe-Knob 161-kV9

  2. KvH Projekt GmbH Co KG | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpInc Place:Keystone Clean Air JumpMaine. ItsKun Renewables JumpKvH

  3. 1.9 kV AlGaN/GaN Lateral Schottky Barrier Diodes on Silicon

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Zhu, Mingda [University of Notre Dame, IN (United States); Song, Bo [Cornell University, Ithaca, NY (United States); Qi, Meng [University of Notre Dame, IN (United States); Hu, Zongyang [University of Notre Dame, IN (United States); Nomoto, Kazuki [University of Notre Dame, IN (United States); Yan, Xiaodong [University of Notre Dame, IN (United States); Cao, Yu [IQE/HRL Labs; Johnson, Wayne [IQE, Westborough, MA (United States); Kohn, Erhard [University of Notre Dame, IN (United States); Jena, Debdeep [Cornell University, Ithaca, NY (United States); Xing, Grace Huili [Cornell University, Ithaca, NY (United States)

    2015-04-01T23:59:59.000Z

    In this letter, we present AlGaN/GaN lateral Schottky barrier diodes on silicon with recessed anodes and dual field plates. A low specific on-resistance RON,SP (5.12 m?{center_dot}cm2), a low turn-on voltage (1.9 kV), were simultaneously achieved in devices with a 25 ?m anode/cathode separation, resulting in a power figure-of-merit (FOM) BV2/RON,SP of 727 MW{center_dot}cm2. The record high breakdown voltage of 1.9 kV is attributed to the dual field plate structure.

  4. AC and lightning performance of fiberglass crossarms aged in 115 kV transmission line

    SciTech Connect (OSTI)

    Grzybowski, S. (Mississippi State Univ., Mississippi State, MS (United States). Dept. of Electrical and Computer Engineering); Jenkins, E.B. (Entergy, New Orleans, LA (United States). Generation and Transmission Group)

    1993-10-01T23:59:59.000Z

    This paper presents the results of an investigation of the electrical performance of 115 kV transmission line fiberglass cross-arm used by Mississippi Power and Light Company. A transmission line fiberglass crossarm removed from service and companion cross-arms outdoors but not in service were examined. The evaluation of electrical performance was based on flashover voltage value at AC voltage and standard lightning impulses as well as under dry and wet conditions. The tests were performed in the Mississippi State University High Voltage Laboratory. The obtained flashover voltages show no large differences in electrical strength of fiberglass crossarms removed from service and those stored outdoors. The Added CFO voltage by fiberglass crossarm to the porcelain suspension insulators is presented versus the length of the fiberglass crossarm for dry and wet conditions.

  5. Malcolm, N. and Aggarwal, R.k. (2014) An Analysis of Reducing Back Flashover Faults with Surge Arresters on 69/138 kV Double

    E-Print Network [OSTI]

    McCusker, Guy

    Arresters on 69/138 kV Double Circuit Transmission Lines Due to Direct Lightning Strikes on the Shield Wires-EMTP, Back flashover faults, Lightning strokes, Surge arrester, Transmission lines. Abstract Back flashover causes of power interruptions on the double-circuit 69/138 kV overhead transmission lines in Jamaica

  6. Performance characteristics of the Atlas 60 kV, 60 kJ plastic capacitors

    SciTech Connect (OSTI)

    Reass, W.; Bennet, G.; Bowman, D.; Lopez, E.; Monroe, M.; Parsons, W.

    1997-12-01T23:59:59.000Z

    This paper provides the performance data of Atlas plastic capacitors as supplied by Maxwell Technologies and Aerovox Corporation. The fiberglass cases at 13 inches high by 29 inches wide and 28 inches in depth with a 2 inch by 18 inch bushing on each end. Two styles of the 33.5uF capacitors have been evaluated for Atlas use, a conventional paper-foil and a self-healing metalized-paper and plastic dielectric design. A test program to capacitor failure, is being used to evaluate capacitor lifetime at full voltage (60 kV) and a nominal 15% reversal. With the Atlas parameters, peak currents of {approximately} 340 kA are realized. In anticipation of faults, capacitors are capable, specified, and tested for 700 kA performance. Accurate methods are also utilized to determine capacitor inductance, less than 20 nH. The results of the various capacitor testing programs will be presented in addition to future directives for their R and D efforts.

  7. EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project, Yakima, Grant, Benton and Kittitas Counties, Washington

    Broader source: Energy.gov [DOE]

    The Bureau of Land Management is preparing, with DOE’s Bonneville Power Administration (BPA) as a cooperating agency, an EIS that evaluates the potential environmental impacts of a proposal to construct a 60- to 67-mile long 230-kV transmission line. BPA’s proposed action is to interconnect the transmission line to an existing BPA substation. Additional information is available at http://www.blm.gov/or/districts/spokane/plans/vph230/.

  8. Heavy duty insulator assemblies for 500-kV bulk power transmission line with large diameter octagonalbundled conductor

    SciTech Connect (OSTI)

    Tsujimoto, K.; Hayase, I.; Hirai, J.; Inove, M.; Naito, K.; Yukino, T.

    1982-11-01T23:59:59.000Z

    This paper describes the design procedure and the results of field tests on mechanical performances of insulator assemblies newly developed to support octagonal-bundled conductors for 500-kV bulk power transmission. Taking account of conductor-motion-induced peak tensile load, fatigue, torsional torque and others, a successful design has been achieved in two prototype assemblies for such heavy mechanical duties as encountered during conductor galloping or swing. This has been proved throughout three years of the field tests.

  9. EIS-0025: Miles City-New Underwood 230-kV Electrical Transmission Line, Montana, North Dakota, and South Dakota

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy’s Western Area Power Administration prepared this statement to assess the environmental and socioeconomic implications of its proposed action to construct a 3.28-mile, 230-kV transmission line between Miles City and Baker, Montana , Hettinger, North Dakota , and New Underwood , South Dakota , in Custer and Fallon Counties in Montana, Adams , Bowman , and Slope Counties in North Dakota and Meade, Pennington, and Perkins Counties in South Dakota.

  10. EIS-0005-FS: Bonneville Power Administration Proposed FY 1979 Program, Facility Location on Supplement, Southwest Oregon Area Service, Buckley-Summer Lake 500 kV Line, Supplemental

    Broader source: Energy.gov [DOE]

    This Bonneville Power Administration document assesses the environmental impacts of constructing transmission facilities, which will coordinate with the Midpoint-Malin 500-kV line to be constructed by the Pacific Power and Light (PP&L) Company. The proposed action includes the construction of the 1.56-mile Buckley-Summer Lake 500-kV transmission line; the proposed Buckley Substation near Maupin, Oregon; and the proposed Summer Lake Substation near Silver Lake, Oregon.

  11. Gain Measurement of Antennas using RFID Pavel V. Nikitin and K.V. S. Rao

    E-Print Network [OSTI]

    Hochberg, Michael

    modulation [4-6], using fixed impedance loads [7], and special small battery operated RF transceivers [8 RF hardware [14], or even made simply and inexpensively using a standard RFID reader and a bank

  12. EIS-0129: New England/Hydro-Quebec 450 kV Transmission Line Interconnection- Phase II

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration issued this EIS to explore the impacts of amending Presidential Permit PP-76 to allow the Vermont Electrical Company to operate at power levels above those stipulated in the permit and to build additional transmission facilities to distribute the increased power.

  13. EIS-0103: New England/Hydro-Quebec 450-kV Direct Current Transmission Line Interconnection

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration prepared this statement to evaluate the environmental impacts of the construction, maintenance and operation of a 57-mile transmission line from Monroe, New Hampshire, to the U.S./Canadian border for the purpose of economic exchange of power and increased reliability.

  14. High speed transfer switch with 50 kA and 50 kV

    SciTech Connect (OSTI)

    Reass, W.A.; Kasik, R.J.; Wilds, W.A.

    1989-01-01T23:59:59.000Z

    This paper gives the mechanical design and electrical parameters of a pneumatically operated transfer switch. This design is used to switch 3-second 50-kA current pulses, and is easily capable of 75 kA operation (2 {times} 10{sup 10} I{sup 2}t); with water-cooled versions capable of 20 kA continuously. Although the switch is not specifically designed to make or break 50 kA, it is provided with auxiliary Elkonite arcing contacts have proven their value in protecting the main electrodes even under repetitive (50 kA) fault conditions. Included in this presentation will be the results of extensive life testing and associated criteria. 6 figs., 1 tab.

  15. EIS-0112: Rifle to San Juan 345-kV Transmission Line and Associated Facilities

    Broader source: Energy.gov [DOE]

    The U.S. Department of Agriculture - Rural Electrification Administration developed this statement to evaluate the environmental impacts of the Colorado-Ute Electric Association Inc. and the U.s. Department of Energy's Western Area Power Administration (WAPA) constructing and operating a 345-kilovolt transmission line from Rifle, Colorado, to the San Juan Generating Station near Farmington, New Mexico. WAPA served as a cooperating agency in the preparation of this statement and adopted it on 10/30/1984. WAPA assumed the lead role for project implementation after issuance of the final statement.

  16. Type A Accident Investigation Board Report of the April 25, 1997, Contractor Fatality on the Olympia-White River #1 230 kV Line

    Broader source: Energy.gov [DOE]

    On April 25, 1997, at approximately 1510 hours, a lineman for Great Southwestern Construction Inc. was fatally electrocuted when he came in direct contact with a deenergized 230-kilovolt (kV) transmission power line conductor which contained an induced voltage.

  17. Type A Accident Investigation Report on the June 25, 1997, Contractor Inspector Fatality on the Satsop-Aberdeen #2 & #3 230 kV Line

    Broader source: Energy.gov [DOE]

    On June 27, 1997, I established a Type-A Accident Investigation Board to investigate the June 25, 1997 fatal contractor accident which occurred on BPA?s Satsop-Aberdeen #2 and #3 230-kV transmission lines right-of-way.

  18. Fast 8 kV metal-oxide semiconductor field-effect transistor switch R. E. Continetti, D. R. Cyr,al and D. M. Neumarkb)

    E-Print Network [OSTI]

    Neumark, Daniel M.

    V. A key to this approach is the use of a metal-oxide varistor (MOV) to clamp the voltage acrossa givenFast 8 kV metal-oxide semiconductor field-effect transistor switch R. E. Continetti, D. R. Cyr transformer-isolatedpower metal-oxide semiconductor field-effect transistors in seriesis described

  19. Seasonal Patterns of Melatonin, Cortisol, and Progesterone Secretion in Female Lambs Raised Beneath a 500-kV Transmission Line.

    SciTech Connect (OSTI)

    Lee, Jack M.

    1992-06-01T23:59:59.000Z

    Although several kinds of biological effects of electric and magnetic fields have been reported from laboratory studies, few have been independently replicated. When this study was being planned, the suppression of nighttime melatonin in rodents was thought to represent one of the strongest known effects of these fields. The effect had been replicated by a single laboratory for 60-Hz electric fields, and by multiple laboratories for d-c magnetic fields. The primary objective of this study was to determine whether the effect of electric and magnetic fields on melatonin would also occur in sheep exposed to a high voltage transmission line. The specific hypothesis tested by this experiment was as follows: The electrical environment produced by a 60-Hz, 500-kV transmission line causes a depression in nocturnal melatonin in chronically exposed female lambs. This may mimic effects of pinealectomy or constant long-day photoperiods, thus delaying the onset of reproductive cycles. Results of the study do not provide evidence to support the hypothesis. Melatonin concentrations in the sheep exposed to the transmission line showed the normal pattern of low daytime and high nighttime serum levels. As compared to the control group, there were no statistically significant group differences in the mean amplitude, phase, or duration of the nighttime melatonin elevation.

  20. Environmental Assessment and Finding of No Significant Impact: Western's Hoover Dam Bypass Project Phase II (Double-Circuiting a Portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 230-kV Transmission Line, Clark County, Nevada)

    SciTech Connect (OSTI)

    N /A

    2003-10-27T23:59:59.000Z

    The U.S. Highway 93 (U.S. 93) Hoover Dam Bypass Project calls for the U.S. Department of Energy (DOE) Western Area Power Administration (Western) to remove its Arizona and Nevada (A&N) Switchyard. As a result of this action, Western must reconfigure its existing electrical transmission system in the Hoover Dam area. Western proposes to double-circuit a portion of the Hoover-Mead No.5 and No.7 230-kV Transmission Lines with the Henderson-Mead No.1 Transmission Line (see Figure 1-1). Double-circuiting is the placement of two separate electrical circuits, typically in the form of three separate conductors or bundles of conductors, on the same set of transmission line structures. The old Henderson-Hoover 230-kV Transmission Line would become the new Henderson-Mead No.1 and would extend approximately eight miles to connect with the Mead Substation. Western owns, operates, and maintains the Hoover-Mead No.5 and No.7, and Henderson-Hoover electrical power transmission lines. Additionally, approximately 0.25 miles of new right-of-way (ROW) would be needed for the Henderson-Mead No.1 when it transfers from double-circuiting with the Hoover-Mead No.7 to the Hoover-Mead No.5 at the Boulder City Tap. The proposed project would also involve a new transmission line ROW and structures where the Henderson-Mead No.1 will split from the Hoover-Mead No.5 and enter the northeast corner of the Mead Substation. Lastly, Western has proposed adding fiber optic overhead ground wire from the Hoover Power Plant to the Mead Substation on to the Henderson-Mead No.1, Hoover-Mead No.5 and No.7 Transmission Lines. The proposed project includes replacing existing transmission line tower structures, installing new structures, and adding new electrical conductors and fiber optic cables. As a consequence of these activities, ground disturbance may result from grading areas for structure placement, constructing new roads, improving existing roads for vehicle and equipment access, and from installing structures, conductors, and fiber optic cables. Project construction activities would be conducted within the existing 200-foot transmission line ROW and 50-foot access road ROW, although new spur access roads could occur outside of existing ROWs. As lead Federal agency for this action under National Environmental Policy Act (NEPA), Western must ensure that adverse environmental effects on Federal and non-Federal lands and resources are avoided or minimized. This Environmental Assessment (EA) is intended to be a concise public document that assesses the probable and known impacts to the environment from Western's Proposed Action and alternatives, and reaches a conclusion about the significance of the impacts. This EA was prepared in compliance with NEPA regulations published by the Council on Environmental Quality (40 CFR 1500-1508) and implementing procedures of the Department of Energy (10 CFR 1021).

  1. Testing of a 50 kA, 50 kV current interrupter with I sup 2 t preheating and long recovery voltage

    SciTech Connect (OSTI)

    Reass, W.A.; Boenig, H.J.; Melton, J.G. (Los Alamos National Lab., NM (USA))

    1989-01-01T23:59:59.000Z

    The Confinement Physics Research Facility (CPRF) presently being constructed at Los Alamos in a next generation Reversed Field Pinch (RFP) plasma experiment. An inductive energy transfer system, employing a 50 kA, 50 kV dc current interrupter, is being utilized for initiating the plasma current. These performance requirements (50 kA, 50 kV) had yet to be realized in a reliable switching system, development of this current interrupter system was initiated. A switch test bay with a 50 kA battery bank has been built at Los Alamos to test the interrupter in conditions which will exist in the CPRF experiment. Many switch parameters were measured to provide information on the current interrupting characteristics and reliability. Some of these diagnostics include voltage, current, pre and post I{sup 2}t contact resistance, opening speed and position, arc voltage, and stem temperature. To determine any long term changes, all shots and data channels are computer indexed, and may be easily recalled for review. Extensive testing was performed on Siemens D-10 vacuum interrupter. Test parameter space included 55 kA, 40 kV (per bottle); di/dt of 2250 A/{mu}s, I{sup 2}t of 5 {times} 10{sup 9} amp{sup 2} sec; and 20 kV-200 msec RC recovery decay. Circuit parameters effect opening reliability. Circuit data and the associated testing results will be presented along with long term trends of switch performance under normal'' conditions. 12 figs.

  2. Progress on the 140 KV, 10 Megawatt Peak, 1 Megawatt Average Polyphase Quasi-Resonant Bridge, Boost Converter/Modulator for the Spallation Neutron Source (SNS) Klystron Power System

    E-Print Network [OSTI]

    Reass, W A; Gribble, R F; Lynch, M T; Tallerico, P J; Reass, William A.; Doss, James D.; Gribble, Robert F.; Lynch, Michael T.; Tallerico, Paul J.

    2000-01-01T23:59:59.000Z

    This paper describes electrical design and operational characteristics of a zero-voltage-switching 20 kHz polyphase bridge, boost converter/modulator for klystron pulse application. The DC-DC converter derives the buss voltages from a standard 13.8 kV to 2300 Y substation cast-core transformer. Energy storage and filtering is provided by self-clearing metallized hazy polypropylene traction capacitors. Three "H-Bridge" IGBT switching networks are used to generate the polyphase 20 kHz transformers primary drive waveforms. The 20 kHz drive waveforms are chirped the appropriate duration to generate the desired klystron pulse width. PWM (pulse width modulation) of the individual 20 kHz pulses is utilized to provide regulated output waveforms with adaptive feedforward and feedback techniques. The boost transformer design utilizes amorphous nanocrystalline material that provides the required low core loss at design flux levels and switching frequencies. Resonant shunt peaking is used on the transformer secondary to ...

  3. Voltage flicker prediction for two simultaneously operated ac arc furnaces

    SciTech Connect (OSTI)

    Tang, L. [ABB Power T and D Co., Inc., Raleigh, NC (United States)] [ABB Power T and D Co., Inc., Raleigh, NC (United States); Kolluri, S. [Entergy Services, New Orleans, LA (United States)] [Entergy Services, New Orleans, LA (United States); McGranaghan, M.F. [Electrotek Concepts, Inc., Knoxville, TN (United States)] [Electrotek Concepts, Inc., Knoxville, TN (United States)

    1997-04-01T23:59:59.000Z

    An EMTP-based arc furnace model was developed for evaluation of flicker concerns associated with supplying a large integrated steel mill as they go from one to two furnace operation and as system changes are implemented that will affect the short circuit capacity at the 230 kV power supply substation. The model includes a dynamic arc representation which is designed to be characteristic of the initial portions of the melt cycle when the arc characteristics are the most variable (worst flicker conditions). The flicker calculations are verified using previous measurements with one furnace operation. Flicker simulations were then performed to evaluate a variety of different possible system strengths with both one and two furnaces in operation. The primary flicker measure used for this study is the unweighted rms value of the fluctuation envelope, expressed as a percentage of the rms line-to-ground voltage magnitude.

  4. EIS-0079: 300-kV International Submarine Transmission Line- Erie, Pennsylvania to Nanticoke, Ontario, Canada General Public Utilities Corporation

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy Office of Energy Emergency Operations developed this statement to assess the potential environmental and socioeconomic impacts of the construction and operation of 44 miles of cable between the Erie West Substation and the Canadian border.

  5. Case Study of the Failure of two 13.8kV Control & Metering Transformers that caused significant Equipment Damage

    SciTech Connect (OSTI)

    Dreifuerst, G R; Chew, D B; Mangonon, H L; Swyers, P W

    2011-08-25T23:59:59.000Z

    The degradation and failure of cast-coil epoxy windings within 13.8kV control power transformers and metering potential transformers has been shown to be dangerous to both equipment and personnel, even though best industrial design practices were followed. Accident scenes will be examined for two events at a U.S. Department of Energy laboratory. Failure modes will be explained and current design practices discussed with changes suggested to prevent a recurrence and to minimize future risk. New maintenance philosophies utilizing partial discharge testing of the transformers as a prediction of end-of-life will be examined.

  6. Development of NS-TACSR with extremely suppressed aeolian noise and its application to 500 kV overhead transmission lines

    SciTech Connect (OSTI)

    Tsujimoto, K.; Furukawa, S. (Kansai Electric Power Co., Inc., Osaka (Japan)); Shimojima, K.; Yamamoto, K. (Hitachi Cable, Ltd., Hitachi (JP))

    1991-10-01T23:59:59.000Z

    Recently in Japan, with the unprecedented advance of residential area development in the suburbs of large cities, it has become quite difficult to secure the routes of EHV transmission lines from nuclear power plants in remote places to the suburbs of large cities, urging resolution of environmental problems related to transmission lines. In Japan, aerodynamic sound produced by conductors and insulators frequently caused noise problems. Having an opportunity of constructing a 500 kV transmission line through a residential are, we made a research to resolve this noise problem. This paper describes the characteristics of aeolian noise and preventive measures against it.

  7. OPERATIONS (OPS)

    Broader source: Energy.gov (indexed) [DOE]

    OPS) OBJECTIVE OPS.1 The formality and discipline of operations is adequate to conduct work safely and programs are in place to maintain this formality and discipline. (CR 13)...

  8. Design operators

    E-Print Network [OSTI]

    Dritsas, Stylianos, 1978-

    2004-01-01T23:59:59.000Z

    Design operators is a thesis that investigates the nature and characteristics of the design process by examining the interaction of computation with architectural design. The effects of the introduction of these media in ...

  9. Operating Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28T23:59:59.000Z

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  10. Low-energy dc ion source for low operating pressure

    SciTech Connect (OSTI)

    Oks, Efim, E-mail: oks@opee.hcei.tsc.ru [Institute of High Current Electronics, Russian Academy of Sciences, Akademichesky ave. 2/3, Tomsk 634055 (Russian Federation); State University of Control Systems and Radioelectronics, 40 Lenin Ave., Tomsk 634050 (Russian Federation); Shandrikov, Maxim [Institute of High Current Electronics, Russian Academy of Sciences, Akademichesky ave. 2/3, Tomsk 634055 (Russian Federation); Salvadori, Cecilia [Institute of Physics, University of Săo Paulo, C.P. 66318, CEP 05315-970 Săo Paulo S.P. (Brazil); Brown, Ian [Lawrence Berkeley National Laboratory, 1 Cyclotron Road, Berkeley, California 94720 (United States)

    2014-08-15T23:59:59.000Z

    We report on an experimental study of an ion source based on a Penning discharge with a cold hollow cathode in crossed electric and magnetic fields. The minimum vacuum chamber operating pressure was 3 × 10{sup ?5} Torr for argon and 5 × 10{sup ?5} Torr for hydrogen. The use of a hollow cathode allowed decreasing the discharge operating voltage down to 350 V at a discharge current of ?100 mA. At a discharge current of 100 mA and beam accelerating voltage of 2 kV, the ion current was 2.5 mA for argon and 8 mA for hydrogen, and the ion beam on-axis current density 170 and 450 ?A/cm{sup 2}, respectively. The current-voltage characteristics of the discharge and the radial ion beam current density distribution were measured. The influence of pressure on the discharge parameters and their time stability was investigated.

  11. Operation Poorman

    SciTech Connect (OSTI)

    Pruvost, N.; Tsitouras, J.

    1981-03-18T23:59:59.000Z

    The objectives of Operation Poorman were to design and build a portable seismic system and to set up and use this system in a cold-weather environment. The equipment design uses current technology to achieve a low-power, lightweight system that is configured into three modules. The system was deployed in Alaska during wintertime, and the results provide a basis for specifying a mission-ready seismic verification system.

  12. Operations Videos

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 TechnicalOilOnlineandOperations

  13. Beam extraction and high stability operation of high current electron cyclotron resonance proton ion source

    SciTech Connect (OSTI)

    Roychowdhury, P., E-mail: pradipr@barc.gov.in; Mishra, L.; Kewlani, H.; Mittal, K. C. [Accelerator and Pulse Power Division, Bhabha Atomic Research Centre, Trombay, Mumbai 400085 (India)] [Accelerator and Pulse Power Division, Bhabha Atomic Research Centre, Trombay, Mumbai 400085 (India); Patil, D. S. [Laser and Plasma Technology Division, Bhabha Atomic Research Centre, Trombay, Mumbai 400085 (India)] [Laser and Plasma Technology Division, Bhabha Atomic Research Centre, Trombay, Mumbai 400085 (India)

    2014-03-15T23:59:59.000Z

    A high current electron cyclotron resonance proton ion source is designed and developed for the low energy high intensity proton accelerator at Bhabha Atomic Research Centre. The plasma discharge in the ion source is stabilized by minimizing the reflected microwave power using four stub auto tuner and magnetic field. The optimization of extraction geometry is performed using PBGUNS code by varying the aperture, shape, accelerating gap, and the potential on the electrodes. While operating the source, it was found that the two layered microwave window (6 mm quartz plate and 2 mm boron nitride plate) was damaged (a fine hole was drilled) by the back-streaming electrons after continuous operation of the source for 3 h at beam current of 20–40 mA. The microwave window was then shifted from the line of sight of the back-streaming electrons and located after the water-cooled H-plane bend. In this configuration the stable operation of the high current ion source for several hours is achieved. The ion beam is extracted from the source by biasing plasma electrode, puller electrode, and ground electrode to +10 to +50 kV, ?2 to ?4 kV, and 0 kV, respectively. The total ion beam current of 30–40 mA is recorded on Faraday cup at 40 keV of beam energy at 600–1000 W of microwave power, 800–1000 G axial magnetic field and (1.2–3.9) × 10{sup ?3} mbar of neutral hydrogen gas pressure in the plasma chamber. The dependence of beam current on extraction voltage, microwave power, and gas pressure is investigated in the range of operation of the ion source.

  14. Environmental Assessment and Finding of No Significant Impact: Curecanti-Lost Canyon 230-kV Transmission Line Reroute Project, Montrose County, Colorado

    SciTech Connect (OSTI)

    N /A

    2000-03-20T23:59:59.000Z

    The Department of Energy (DOE), Western Area Power Administration (Western) is proposing to reroute a section of the Curecanti-Lost Canyon 230-kilovolt (kV) transmission line, in Montrose County, Colorado. A portion of the transmission line, situated 11 miles southeast of Montrose, Colorado, crosses Waterdog Peak, an area of significant geologic surface activity, which is causing the transmission line's lattice steel towers to shift. This increases stress to structure hardware and conductors, and poses a threat to the integrity of the transmission system. Western proposes to relocate the lattice steel towers and line to a more geologically stable area. The existing section of transmission line and the proposed relocation route cross Bureau of Land Management and private land holdings.

  15. Operations Information

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 The 2002 WholesaleEnergy'sRunning jobsOPERATING PLANOperations

  16. ,"Table 3B.1. FRCC Monthly Peak Hour Demand, by North American Electric Reliability Corporation Assesment Area,"

    U.S. Energy Information Administration (EIA) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National and Regional Data; Row: NAICS Codes; Column: EnergyShale ProvedTexas"Brunei (Dollars per ThousandPrice Sold to9"3 and Projected

  17. New Switches for Utility-Scale Inverters: First In-Class Demonstration of a Completely New Type of SiC Bipolar Switch (15kV-20kV) for Utility-Scale Inverters

    SciTech Connect (OSTI)

    None

    2011-12-31T23:59:59.000Z

    Solar ADEPT Project: The SiCLAB is developing a new power switch for utility-scale PV inverters that would improve the performance and significantly reduce the size, weight, and energy loss of PV systems. A power switch controls the electrical energy flowing through an inverter, which takes the electrical current from a PV solar panel and converts it into the type and amount of electricity that is compatible with the electric grid. SiCLAB is using silicon carbide (SiC) semiconductors in its new power switches, which are more efficient than the silicon semiconductors used to conduct electricity in most conventional power switches today. Switches with SiC semiconductors can operate at much higher temperatures, as well as higher voltage and power levels than silicon switches. SiC-based power switches are also smaller than those made with silicon alone, so they result in much smaller and lighter electrical devices. In addition to their use in utility-scale PV inverters, SiCLAB’s new power switches can also be used in wind turbines, railways, and other smart grid applications.

  18. Hermitian Young operators

    SciTech Connect (OSTI)

    Keppeler, Stefan, E-mail: stefan.keppeler@uni-tuebingen.de [Mathematisches Institut, Universität Tübingen, Auf der Morgenstelle 10, 72076 Tübingen (Germany)] [Mathematisches Institut, Universität Tübingen, Auf der Morgenstelle 10, 72076 Tübingen (Germany); Sjödahl, Malin, E-mail: malin.sjodahl@thep.lu.se [Department of Astronomy and Theoretical Physics, Lund University, Sölvegatan 14A, 223 62 Lund (Sweden)] [Department of Astronomy and Theoretical Physics, Lund University, Sölvegatan 14A, 223 62 Lund (Sweden)

    2014-02-15T23:59:59.000Z

    Starting from conventional Young operators, we construct Hermitian operators which project orthogonally onto irreducible representations of the (special) unitary group.

  19. 2.3-MW Medium-Voltage, Three-Level Wind Energy Inverter Applying a Unique Bus Structure and 4.5-kV Si/SiC Hybrid Isolated Power Modules: Preprint

    SciTech Connect (OSTI)

    Erdman, W.; Keller, J.; Grider, D.; VanBrunt, E.

    2014-11-01T23:59:59.000Z

    A high-efficiency, 2.3-MW, medium-voltage, three-level inverter utilizing 4.5-kV Si/SiC (silicon carbide) hybrid modules for wind energy applications is discussed. The inverter addresses recent trends in siting the inverter within the base of multimegawatt turbine towers. A simplified split, three-layer laminated bus structure that maintains low parasitic inductances is introduced along with a low-voltage, high-current test method for determining these inductances. Feed-thru bushings, edge fill methods, and other design features of the laminated bus structure provide voltage isolation that is consistent with the 10.4-kV module isolation levels. Inverter efficiency improvement is a result of the (essential) elimination of the reverse recovery charge present in 4.5-kV Si PIN diodes, which can produce a significant reduction in diode turn-off losses as well as insulated-gate bipolar transistor (IGBT) turn-on losses. The hybrid modules are supplied in industry-standard 140 mm x 130 mm and 190 mm x 130 mm packages to demonstrate direct module substitution into existing inverter designs. A focus on laminated bus/capacitor-bank/module subassembly level switching performance is presented.

  20. Operations and compositions in transrecursive operators

    SciTech Connect (OSTI)

    Burgin, M.S.; Borodyanskii, Yu.M.

    1995-03-01T23:59:59.000Z

    The present study is a continuation of a study focusing on introduction and analysis of operations on transrecursive operators, which are similar to the operators considered in the theory of algorithms. Such operations may be standard product of algorithms) or special ({alpha}-disjunction and {alpha}-iteration. In some respects, these operations in the class of transrecursive operators are similar to their traditional analogs. In other respects, however, they are essentially different. For instance, they may have different types and modes. Specific features of operations on transrecursive operators are attributable to explicit omission of some restrictions on their construction compared with the construction of algorithms. The standard approaches to mathematical modeling of the concept of algorithm assume a number of essential restrictions. Specifically, they assume finiteness of (1) the input data arriving during a finite time interval; (2) the list of rules underlying the operations of the algorithm; (3) the transformations executed by a single operation; (4) the description of each rule; (5) the time to execute one operation; (6) the time to execute one operation; (7) the number of cycles that the algorithm executes in order to realize the mapping. In application to Turing machines, these restrictions imply finiteness of the initial word, finiteness of the command table of the read head, and ultimate stopping when the result is obtained after finitely many steps. Various classes of transrecursive operators are constructed by dropping various combinations of the {open_quotes}finiteness{close_quotes} restrictions. Two classes of transrecursive operators - the limit (inductive) Turing machines and transalgorithms - have been obtained by dropping respectively the assumption of finiteness of the number of execution cycles and the assumption of finiteness of the list of rules.

  1. Operating Permits (New Jersey)

    Broader source: Energy.gov [DOE]

    The owner or operator of a facility subject to this article shall obtain and maintain an operating permit for the facility. The owner or operator of a facility subject to this article shall ensure...

  2. Cogeneration Operational Issues

    E-Print Network [OSTI]

    Williams, M.

    operations. Other operational issues also include utility transmission planning, generation planning and fuel mix decisions. All of these operational problems have an impact on the ratepayer in regard to quality of electric service and future rates. Both...

  3. Air Carrier Flight Operations

    E-Print Network [OSTI]

    Midkif, Alan H.

    Most air carriers operate under a system of prioritized goals including safety, customer service (on-time departures and arrivals) and operating economics. The flight operations department is responsible for the safe and ...

  4. Heat Transfer Operators Associated with Quantum Operations

    E-Print Network [OSTI]

    Ç. Aksak; S. Turgut

    2011-04-14T23:59:59.000Z

    Any quantum operation applied on a physical system is performed as a unitary transformation on a larger extended system. If the extension used is a heat bath in thermal equilibrium, the concomitant change in the state of the bath necessarily implies a heat exchange with it. The dependence of the average heat transferred to the bath on the initial state of the system can then be found from the expectation value of a hermitian operator, which is named as the heat transfer operator (HTO). The purpose of this article is the investigation of the relation between the HTOs and the associated quantum operations. Since, any given quantum operation on a system can be realized by different baths and unitaries, many different HTOs are possible for each quantum operation. On the other hand, there are also strong restrictions on the HTOs which arise from the unitarity of the transformations. The most important of these is the Landauer erasure principle. This article is concerned with the question of finding a complete set of restrictions on the HTOs that are associated with a given quantum operation. An answer to this question has been found only for a subset of quantum operations. For erasure operations, these characterizations are equivalent to the generalized Landauer erasure principle. For the case of generic quantum operations however, it appears that the HTOs obey further restrictions which cannot be obtained from the entropic restrictions of the generalized Landauer erasure principle.

  5. Building Operator Certification

    E-Print Network [OSTI]

    Lilley, D.

    2013-01-01T23:59:59.000Z

    Building Operator Certification Energy Efficiency through Operator Training CATEE December 18, 2013 – San Antonio, TX Dennis Lilley, CEM, PMP ESL-KT-13-12-49 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16...-18 Building Operator Certification Energy Efficiency through Operator Training What is Building Operator Certification? Industry-recognized credential in energy efficient building operation practices Created with 100 industry experts Launched in 1996 9...

  6. Operations Research Analyst

    Broader source: Energy.gov [DOE]

    The incumbent in this position will serve as an Operations Research Analyst in the Generation Scheduling (PGS). The Operations Research Analyst is responsible for analytical work that involves...

  7. The design, construction, and operation of long-distance high-voltage electricity transmission technologies.

    SciTech Connect (OSTI)

    Molburg, J. C.; Kavicky, J. A.; Picel, K. C.

    2008-03-03T23:59:59.000Z

    This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these conductors at a safe distance from each other and from the ground and the natural and built environment. Common elements that are generally less visible (or at least more easily overlooked) include the maintained ROW along the path of the towers, access roads needed for maintenance, and staging areas used for initial construction that may be restored after construction is complete. Also visible but less common elements along the corridor may include switching stations or substations, where lines of similar or different voltages meet to transfer power.

  8. NUCLEAR PLANT OPERATIONS AND

    E-Print Network [OSTI]

    Pázsit, Imre

    NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: neutron flux, cur- rent noise, vibration diagnostics: Swedish Nuclear Powe

  9. Operator pencil passing through a given operator

    SciTech Connect (OSTI)

    Biggs, A., E-mail: khudian@manchester.ac.uk, E-mail: adam.biggs@student.manchester.ac.uk; Khudaverdian, H. M., E-mail: khudian@manchester.ac.uk, E-mail: adam.biggs@student.manchester.ac.uk [School of Mathematics, University of Manchester, Oxford Road, Manchester M13 9PL (United Kingdom)

    2013-12-15T23:59:59.000Z

    Let ? be a linear differential operator acting on the space of densities of a given weight ?{sub 0} on a manifold M. One can consider a pencil of operators ?-circumflex(?)=(?{sub ?}) passing through the operator ? such that any ?{sub ?} is a linear differential operator acting on densities of weight ?. This pencil can be identified with a linear differential operator ?-circumflex acting on the algebra of densities of all weights. The existence of an invariant scalar product in the algebra of densities implies a natural decomposition of operators, i.e., pencils of self-adjoint and anti-self-adjoint operators. We study lifting maps that are on one hand equivariant with respect to divergenceless vector fields, and, on the other hand, with values in self-adjoint or anti-self-adjoint operators. In particular, we analyze the relation between these two concepts, and apply it to the study of diff?(M)-equivariant liftings. Finally, we briefly consider the case of liftings equivariant with respect to the algebra of projective transformations and describe all regular self-adjoint and anti-self-adjoint liftings. Our constructions can be considered as a generalisation of equivariant quantisation.

  10. CONDUCT OF OPERATIONS (CO)

    Broader source: Energy.gov (indexed) [DOE]

    CONDUCT OF OPERATIONS (CO) OBJECTIVE TA-55 SST Facility NNSA ORR Implementation Plan 1 1 CO.1 The formality and discipline of operations is adequate to conduct work safely and...

  11. Reservoir Operation in Texas

    E-Print Network [OSTI]

    Wurbs, Ralph A.

    management of the surface water resources of the various river basins of the state. The operation of these essential water control facilities is examined in this report. Reservoir operation is viewed here from the perspective of deciding how much water...

  12. Aerosol Sampler Operations Manual

    E-Print Network [OSTI]

    Fischer, Emily V.

    -1123 Laboratory FAX (916) 752-4107 Standard Operating Procedures Technical Information Document TI 201A #12;TI 201.................................................................................................................................................. 3 1.0 Weekly Maintenance ProceduresIMPROVE Aerosol Sampler Operations Manual February 10, 1997 Air Quality Group Crocker Nuclear

  13. SWPF Crane Lift Operation

    SciTech Connect (OSTI)

    None

    2010-01-01T23:59:59.000Z

    A multiple vview shot of the SWPF crane lift operation at the Savannah River Site. Funded by the Recovery Act.

  14. Quantum Operations and Measurement

    E-Print Network [OSTI]

    Seevinck, Michiel

    the Stinespring dilation form of E . 6 #12; II: operator­sum representation E(#) = Tr env # U(## # env )U

  15. Operations and maintenance philosophy

    SciTech Connect (OSTI)

    DUNCAN, G.P.

    1999-10-28T23:59:59.000Z

    This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

  16. MANUFACTURING & SERVICE OPERATIONS MANAGEMENT

    E-Print Network [OSTI]

    Boucherie, Richard J.

    MANUFACTURING & SERVICE OPERATIONS MANAGEMENT Vol. 14, No. 4, Fall 2012, pp. 495­511 ISSN 1523 research directions, expanding upon the key points raised by Green [Green LV (2012) The vital role of operations analysis in improving healthcare delivery. Manufacturing Service Oper. Management 14

  17. High power operation of an X-band coaxial multi-beam relativistic klystron amplifier

    SciTech Connect (OSTI)

    Liu, Zhenbang; Huang, Hua; Jin, Xiao; Zhao, Yucong; He, Hu; Lei, Lurong; Chen, Zhaofu [Science and Technology on High Power Microwave Laboratory, Institute of Applied Electronics, China Academy of Engineering Physics, Mianyang 621900 (China)] [Science and Technology on High Power Microwave Laboratory, Institute of Applied Electronics, China Academy of Engineering Physics, Mianyang 621900 (China)

    2013-11-15T23:59:59.000Z

    An X-band coaxial multi-beam relativistic klystron amplifier is designed in order to increase output microwave power and operating frequency of the amplifier tube. The experiment is performed on a Tesla-type accelerator. The amplifier is driven by an electron beam of 2.8 kA at 720 kV, and a microwave power of 30 kW and frequency of 9.384 GHz is injected into an input cavity by means of an external source, then a microwave power of over 800 MW is extracted, the amplifier gain is about 44 dB, and conversion efficiency is 40%. The experiment proves that output power of nearly GWs can be generated with the X-band coaxial multi-beam relativistic klystron amplifier driven by a kW-level input power.

  18. EIS-0067: 230-kV International Transmission Line San Diego County, California to Tijuana, Mexico, San Diego Gas and Electric Company

    Broader source: Energy.gov [DOE]

    The Economic Regulatory Administration and the California Public Utilities Commission jointly prepared this EIS to evaluate the environmental impacts of the construction, maintenance and operation of a 10-mile, 230-kilovolt transmission line across the U.S./Mexico border for the purpose of economic exchange of power and increased reliability.

  19. Cask fleet operations study

    SciTech Connect (OSTI)

    Not Available

    1988-01-01T23:59:59.000Z

    The Nuclear Waste Policy Act of 1982 assigned to the Department of Energy's (DOE) Office of Civilian Waste Management the responsibility for disposing of high-level waste and spent fuel. A significant part of that responsibility involves transporting nuclear waste materials within the federal waste management system; that is, from the waste generator to the repository. The lead responsibility for transportation operations has been assigned to Oak Ridge Operations, with Oak Ridge National Laboratory (ORNL) providing technical support through the Transportation Operations Support Task Group. One of the ORNL support activities involves assessing what facilities, equipment and services are required to assure that an acceptable, cost-effective and safe transportation operations system can be designed, operated and maintained. This study reviews, surveys and assesses the experience of Nuclear Assurance Corporation (NAC) in operating a fleet of spent-fuel shipping casks to aid in developing the spent-fuel transportation system.

  20. Pipeline Operations Program (Louisiana)

    Broader source: Energy.gov [DOE]

    The Pipeline Operations Program regulates the construction, acquisition, abandonment and interconnection of natural gas pipelines, as well as, the transportation and use of natural gas supplies.

  1. Hyponormality of Toeplitz Operators

    E-Print Network [OSTI]

    1910-40-52T23:59:59.000Z

    Amer. Math. Soc. 82(1976), 494-496. [12] S. C. Power. Hankel Operators on Hilbert Space, Pitman, Boston, 1982. [13] D. Sarason. Generalized interpolation in H.

  2. Semicausal operations are semilocalizable

    E-Print Network [OSTI]

    Eggeling, T; Werner, R F

    2002-01-01T23:59:59.000Z

    We prove a conjecture by DiVincenzo, which in the terminology of Preskill et al. [quant-ph/0102043] states that ``semicausal operations are semilocalizable''. That is, we show that any operation on the combined system of Alice and Bob, which does not allow Bob to send messages to Alice, can be represented as an operation by Alice, transmitting a quantum particle to Bob, and a local operation by Bob. The proof is based on the uniqueness of the Stinespring representation for a completely positive map. We sketch some of the problems in transferring these concepts to the context of relativistic quantum field theory.

  3. Operating System Resource Management

    E-Print Network [OSTI]

    Operating System Resource Management Date: Monday, September 27, 2010 Time: 2:00 ­ 3:00 pm Location constrained. This talk will propose a scheme for addressing the operating system resource management problem Sciences Seminar Series presents Pacific Northwest National Laboratory Resource management is the dynamic

  4. Ordered involutive operator spaces

    E-Print Network [OSTI]

    Blecher, David P; Neal, Matthew; Werner, Wend

    2007-01-01T23:59:59.000Z

    This is a companion to recent papers of the authors; here we construct the `noncommutative Shilov boundary' of a (possibly nonunital) selfadjoint ordered space of Hilbert space operators. The morphisms in the universal property of the boundary preserve order. As an application, we consider `maximal' and `minimal' unitizations of such ordered operator spaces.

  5. Operations Research + Information Engineering

    E-Print Network [OSTI]

    Keinan, Alon

    and the equipment they operate to perform most efficiently. The allocation of resources may be represented of the techniques and modeling concepts needed to analyze and design complex systems. As an operations researcher. All business systems are complex and need sophisticated decision-making methods that enable employees

  6. MANUFACTURING & SERVICE OPERATIONS MANAGEMENT

    E-Print Network [OSTI]

    Soares, JoĂŁo LuĂ­s Cardoso

    ;Green and Soares: Note Manufacturing & Service Operations Management 9(1), pp. 54­61, © 2007 INFORMS 55MANUFACTURING & SERVICE OPERATIONS MANAGEMENT Vol. 9, No. 1, Winter 2007, pp. 54­61 issn 1523-Dependent Waiting Time Probabilities in M t /M/s t Queuing Systems Linda V. Green Graduate School of Business

  7. OPERATIONS MANAGEMENT Spring 2008

    E-Print Network [OSTI]

    Almor, Amit

    1 MGSC 395 OPERATIONS MANAGEMENT Spring 2008 Course Syllabus Instructor: Professor Anand Nair Class MATERIALS Required Text Books Textbook: Krajewski, Lee, Ritzman, Larry, and Malhotra, Manoj. Operations Management: Processes and Value Chains, 8 th edition, Prentice Hall, 2007. (ISBN: 0-13-187294-X). Novel

  8. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    SciTech Connect (OSTI)

    Not Available

    1992-04-01T23:59:59.000Z

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  9. Powerline Conductor Operational Testing Facility (PCOT) The Powerline Conductor Operational Testing Facility (PCOT), currently planned for

    E-Print Network [OSTI]

    , a 9-unit, 1400 MW coal- fired generating power station and switchyard, which is 10 miles to the West, and the TVA Roane 500/161 kV Substation, which is 1.5 miles to the East. At the PCOT site, a double-circuit

  10. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Richland Operations Office P.O. Box 550 &?ATES0Richland, Washington 99352 10O-AMSE-0054 A PR I Mr. J. G. Lehew III, President and Chief Executive Officer...

  11. Conduct of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-29T23:59:59.000Z

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 1, 6-25-13

  12. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the internal dosimetry program. " S-li -SED-CHPRC-PFP-002-F1 1: Less than adequate conduct of operations was observed. Failures to follow procedures contributed to...

  13. Operating plan FY 1998

    SciTech Connect (OSTI)

    NONE

    1997-10-01T23:59:59.000Z

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  14. Operations Security Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-04-30T23:59:59.000Z

    To establish policies, responsibilities and authorities for implementing and sustaining the Department of Energy (DOE) Operations Security (OPSEC) Program. Cancels DOE O 5632.3B. Canceled by DOE O 471.2 of 9-28-1995.

  15. Plant Operations Executive Director

    E-Print Network [OSTI]

    Awtar, Shorya

    Campus North Campus Recycling Operations Materials Human Resources Payroll Misc Svs Special Projects Planning Spray Shop Glass Shop Upholstery Shop Plant IT Painting Services G. Weincouff Human Resources Business Services Estimating Shutdown Coordination Scheduling L. Rastique Human Resources 67398 M

  16. Transmission and Storage Operations

    Energy Savers [EERE]

    to see minimal to none in static or dynamic mode) - Rates are dependent on size, mechanical wear and operating pressures * PM * PdM 5 Methane Release Reduction Can the gas be...

  17. Continuity of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-14T23:59:59.000Z

    The notice defines requirements and responsibilities for continuity of operations planning within the DOE to ensure the capability to continue essential Departmental functions across a wide range of all hazard emergencies. Does not cancel other directives.

  18. SNS Target Systems Operational

    E-Print Network [OSTI]

    McDonald, Kirk

    a failed gas seal on the shaft and leaking oil seals but has operated well since then · The moderator 7.5 k First target replacement · No observed corrosion · Internal Boroscope examination in progress · ~ 50 mm

  19. Protection Program Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-10-14T23:59:59.000Z

    This Order establishes requirements for the management and operation of the Department of Energy (DOE) Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE.

  20. CH Packaging Operations Manual

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2005-06-13T23:59:59.000Z

    This procedure provides instructions for assembling the CH Packaging Drum payload assembly, Standard Waste Box (SWB) assembly, Abnormal Operations and ICV and OCV Preshipment Leakage Rate Tests on the packaging seals, using a nondestructive Helium (He) Leak Test.

  1. Nuclear material operations manual

    SciTech Connect (OSTI)

    Tyler, R.P.

    1981-02-01T23:59:59.000Z

    This manual provides a concise and comprehensive documentation of the operating procedures currently practiced at Sandia National Laboratories with regard to the management, control, and accountability of nuclear materials. The manual is divided into chapters which are devoted to the separate functions performed in nuclear material operations-management, control, accountability, and safeguards, and the final two chapters comprise a document which is also issued separately to provide a summary of the information and operating procedures relevant to custodians and users of radioactive and nuclear materials. The manual also contains samples of the forms utilized in carrying out nuclear material activities. To enhance the clarity of presentation, operating procedures are presented in the form of playscripts in which the responsible organizations and necessary actions are clearly delineated in a chronological fashion from the initiation of a transaction to its completion.

  2. Corporate Operating Experience Program

    Broader source: Energy.gov [DOE]

    The DOE Corporate Operating Experience Program helps to prevent the recurrence of significant adverse events/trends by sharing performance information, lessons learned and good practices across the DOE complex.

  3. Operational Waste Volume Projection

    SciTech Connect (OSTI)

    STRODE, J.N.

    2000-08-28T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  4. Operational waste volume projection

    SciTech Connect (OSTI)

    Koreski, G.M.

    1996-09-20T23:59:59.000Z

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June 1996.

  5. SSCL Commissioning and Operations

    SciTech Connect (OSTI)

    NONE

    1992-03-31T23:59:59.000Z

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL.

  6. Updated July 2009 Operations Organization

    E-Print Network [OSTI]

    Eisen, Michael

    All-Hands, Brown Bags, and COO Open-Door sessions Ongoing Conduct Operations Employee Climate SurveysOperations Strategic Plan Updated July 2009 #12;Operations Organization Chief Operating Officer deliver exceptional operational services in support of the scientific mission of Berkeley Lab. goals

  7. Hoyte Phifer Facilities Operations

    E-Print Network [OSTI]

    Saidak, Filip

    battery operated clocks in offices. #12;#12;·Last year, UNCG produced over 1973 tons of solid waste. · 1. , corner of Highland Ave. and Oakland ­ red brick building #12;#12; "All State agencies, universities, and community colleges that have State-owned vehicle fleets shall develop and implement plans to improve

  8. Concept of Operations: Essence

    SciTech Connect (OSTI)

    Hutton, William J.

    2014-04-01T23:59:59.000Z

    This concept of operations is designed to give the reader a brief overview of the National Rural Electric Cooperative Association’s Essence project and a description of the Essence device design. The data collected by the device, how the data are used, and how the data are protected are also discussed in this document.

  9. Conduct of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-29T23:59:59.000Z

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 1, dated 6-25-13, cancels DOE O 422.1. Certified 12-3-14.

  10. Finance & Operations Vice President,

    E-Print Network [OSTI]

    Stanier, Charlie

    Operations · Public Safety Educational Outreach · Safe IA Partnership (S.I.P) · Security Guard Programs Assistance Program · Employee Immigration Services · Employee Disability Services · Family Services · Compensation & Classification · Employee & Labor Relations · Employment Services · Family Issues Committee

  11. REACTOR OPERATIONS AND CONTROL

    E-Print Network [OSTI]

    Pázsit, Imre

    REACTOR OPERATIONS AND CONTROL KEYWORDS: core calculations, neural networks, control rod elevation of a control rod, or a group of control rods, is an important parameter from the viewpoint of reactor control DETERMINATION OF PWR CONTROL ROD POSITION BY CORE PHYSICS AND NEURAL NETWORK METHODS NINOS S. GARIS* and IMRE

  12. Intelligent Potroom Operation

    SciTech Connect (OSTI)

    Jan Berkow; Larry Banta

    2003-07-29T23:59:59.000Z

    The Intelligent Potroom Operation project focuses on maximizing the performance of an aluminum smelter by innovating components for an intelligent manufacturing system. The Intelligent Potroom Advisor (IPA) monitors process data to identify reduction cells exhibiting behaviors that require immediate attention. It then advises operational personnel on those heuristic-based actions to bring the cell back to an optimal operating state in order to reduce the duration and frequency of substandard reduction cell performance referred to as ''Off-Peak Modes'' (OPMs). Techniques developed to identify cells exhibiting OPMs include the use of a finite element model-based cell state estimator for defining the cell's current operating state via advanced cell noise analyses. In addition, rule induction was also employed to identify statistically significant complex behaviors that occur prior to OPMs. The intelligent manufacturing system design, concepts and formalisms developed in this project w ere used as a basis for an intelligent manufacturing system design. Future research will incorporate an adaptive component to automate continuous process improvement, a technology platform with the potential to improve process performance in many of the other Industries of the Future applications as well.

  13. NUCLEAR PLANT OPERATIONS AND

    E-Print Network [OSTI]

    Demazičre, Christophe

    NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: moderator temper ature coefficient, reactivity co reactor Unit 4 of the Ringhals Nuclear Power Plant (Sweden) during fuel cycle 16 is analyzed absorption cross-section behavior. Consequently, if NUCLEAR TECHNOLOGY VOL. 140 NOV. 2002 147 #12;Demazičre

  14. NUCLEAR PLANT OPERATIONS AND

    E-Print Network [OSTI]

    Pázsit, Imre

    NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: moderator temper- ature coefficient, reactivity co reactor Unit 4 of the Ringhals Nuclear Power Plant (Sweden) during fuel cycle 16 is analyzed. Consequently, if*E-mail: demaz@nephy.chalmers.se NUCLEAR TECHNOLOGY VOL. 140 NOV. 2002 147 #12;high-burnup fuel

  15. Hamiltonian and Volume Operators

    E-Print Network [OSTI]

    M. Pierri

    2002-01-04T23:59:59.000Z

    2+1 gravity coupled to a massless scalar field has an initial singularity when the spatial slices are compact. The quantized model is used here to investigate several issues of quantum gravity. The spectrum of the volume operator is studied at the initial singularity. The energy spectrum is obtained. Dynamics of the universe is also investigated.

  16. Office of Business Operations

    Broader source: Energy.gov [DOE]

    The Office of Business Operations manages financial and acquisition management programs throughout the Associate Under Secretary for the Office of Environment, Health, Safety and Security (AU), including the formulation and execution of the AU budget; funding control and accounting activities; preparation of management studies; and provision of acquisition management support.

  17. RUNWAY OPERATIONAL QUALITY ASSURANCE

    E-Print Network [OSTI]

    RUNWAY OPERATIONAL QUALITY ASSURANCE MELANIE BAKER, DARIC MEGERSA & ALFONSO PANLILIO Sponsors: Dr Vortex Separation Rule, for a homogeneous fleet mix, is determined by the time between arriving aircraft Occupancy (SRO) rule, for a non- homogeneous fleet mix, MTC= 3600/ [ROT] [ROT]= = i (pi *ROTi) ROT (in sec

  18. Operations and Maintenance Program Structure

    Broader source: Energy.gov [DOE]

    The Federal Energy Management Program recommends Federal operations and maintenance (O&M) programs comprise of five distinct functions: operations, maintenance, engineering, training, and...

  19. Cable Measuring Engine Operation Procedures

    E-Print Network [OSTI]

    Authors, Various

    2011-01-01T23:59:59.000Z

    MEASURING ENGINE OPERATION PROCEDURES LBNL-40565 SC-MAG-597MEASURING ENGINE OPERATION PROCEDURES INDEX IN T ROD U C TCALIBRATION PROCEDURE . .

  20. Response Operations | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Electricity Delivery and Energy Reliability Response Operations Response Operations Overview The federal government primarily plays a coordinating and support role during...

  1. Cable Measuring Engine Operation Procedures

    E-Print Network [OSTI]

    Authors, Various

    2011-01-01T23:59:59.000Z

    gov CABLE MEASURING ENGINE OPERATION PROCEDURES LBNL-40565LBNL-40565 CABLE MEASURING ENGINE OPERATION PROCEDURES INDEXThe Cable Measuring Engine (CME) is a tool which measures

  2. STANDARD OPERATING PROCEDURES Sampler Maintenance by Site Operators

    E-Print Network [OSTI]

    Fischer, Emily V.

    IMPROVE STANDARD OPERATING PROCEDURES SOP 201 Sampler Maintenance by Site Operators Date Last.0 PURPOSE AND APPLICABILITY This standard operating procedure (SOP) describes the procedures and schedules. The procedural steps for weekly maintenance and repairs performed by the site operator are included in TI 201A

  3. OPERATOR'S MANUAL IMPORTANT NOTES

    E-Print Network [OSTI]

    Kleinfeld, David

    -3 B) LOAD CONNECTION (I) and PAR. 3-3 C) LOAD CONNECTION (II) add the following: Load connectionsMODEL OPERATOR'S MANUAL IMPORTANT NOTES: 1) This manual is valid for the following Model: BOP 20-20, BOP 36-12, BOP 50-8, BOP 72-6, BOP 100-4 BOP 100W, 200W, 400W POWER SUPPLY #12;#12;1 LOAD

  4. Operations Task Management (OTM)

    SciTech Connect (OSTI)

    Miller, C.B.; Duck, C.H.

    1985-10-01T23:59:59.000Z

    This paper reviews the steps taken by management at Ashland Oil to reduce expenses, including an analysis of every aspect of the refinery. It was determined that the areas most adaptable to improvement were the maintenance department, storerooms, the laboratory and energy utilization. The authors focus, however, on the difficulties met in implementing an effective cost control program in the operations area, detailing the reasons why and examining the system ultimately installed in this area.

  5. DCO Operations Interesting Statistics

    E-Print Network [OSTI]

    DCO Operations Interesting Statistics 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Chart by: HANDS DOWN SOFTWARE, www.handsdownsoftware.com 1.00 0.95 0.90 0.85 0.80 0.75 0.70 0.65 0.60 0 is annotated with the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE

  6. Operations Cost Allocation Project

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 TechnicalOilOnlineandOperations

  7. Operational health physics training

    SciTech Connect (OSTI)

    NONE

    1992-06-01T23:59:59.000Z

    The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of {alpha}, {beta}, {gamma}, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included.

  8. IBRD Operational Decision Framework

    SciTech Connect (OSTI)

    Greenwalt, R; Hibbard, W; Raber, E; Carlsen, T; Folks, K; MacQueen, D; Mancieri, S; Bunt, T; Richards, J; Hirabayashi-Dethier, J

    2010-11-12T23:59:59.000Z

    The IBRD Operational Decision Framework in this document is an expansion of an emerging general risk management framework under development by an interagency working group. It provides the level of detail necessary to develop a general Consequence Management Guidance Document for biological contamination remediation and restoration. It is the intent of this document to support both wide area and individual site remediation and restoration activities. This product was initiated as a portion of the IBRD Task 1 Systems Analysis to aid in identification of wide area remediation and restoration shortcomings and gaps. The draft interagency general risk management framework was used as the basis for the analysis. The initial Task 1 analysis document expanded the draft interagency framework to a higher level of resolution, building on both the logic structure and the accompanying text explanations. It was then employed in a qualitative manner to identify responsible agencies, data requirements, tool requirements, and current capabilities for each decision and task. This resulted in identifying shortcomings and gaps needing resolution. Several meetings of a joint LLNL/SNL working group reviewed and approved the initial content of this analysis. At the conclusion of Task 1, work continued on the expanded framework to generate this Operational Decision Framework which is consistent with the existing interagency general risk management framework. A large LLNL task group met repeatedly over a three-month period to develop the expanded framework, coordinate the framework with the biological remediation checklist, and synchronize the logic with the Consequence Management Plan table of contents. The expanded framework was briefed at a large table top exercise reviewing the interagency risk management framework. This exercise had representation from major US metropolitan areas as well as national agencies. This product received positive comments from the participants. Upon completion of the Operational Decision Framework, another joint LLNL/SNL working group conducted a day-long review. Identified modifications were made to the document, resulting in the included product.

  9. Equipment Operational Requirements

    SciTech Connect (OSTI)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11T23:59:59.000Z

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  10. ARM - SGP Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc Documentation RUC :ProductsSCM Forcing Data DerivedInstrumentsPolarExtended FacilityOperations

  11. Operations Information for Studies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 The 2002 WholesaleEnergy'sRunning jobsOPERATING

  12. Operations | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 The 2002 WholesaleEnergy'sRunningOperations Two Argonne teams each

  13. Operations Research Analysts

    Gasoline and Diesel Fuel Update (EIA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"Click worksheet9,1,50022,3,,,,6,1,,781 2,328 2,683DieselValuesEIA-782A andProduct: Total583093Operations

  14. New Operation Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Regionat Cornell Batteries &NSTCurrent IssuesHypothesisNew Operation

  15. Crane Operation Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed Newcatalyst phases on γ-Al2O3.Winter (Part 2) | DepartmentCrane Operational

  16. Operation and Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 TechnicalOilOnlineand Future DirectionOperations

  17. Operations & Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 TechnicalOilOnlineand FutureOperationalRates

  18. Operations & Maintenance

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 TechnicalOilOnlineandOperations and Maintenance

  19. Parastillation Process in Operations

    E-Print Network [OSTI]

    Canfield, F.; Jenkins, O.

    PARASTII.IMICN PIO:ESS rn OPERATIONS Frank canfield ChenShare Coq:oration Houston, Texas The Parastillation process is a new rrethod for ITU.11ti-stage, counter-current contact between vapor and liquid that results in 33% rrore ideal stages... than distillation for a given tray spaci.n;J. Patents have been granted in the U.S.A., U.K., Europe and other countries. Perfonnance of the process has been confimm aver the past several years by eat1puter siITU.llation, by laboratory tests...

  20. Extending quantum operations

    SciTech Connect (OSTI)

    Heinosaari, Teiko [Turku Centre for Quantum Physics, Department of Physics and Astronomy, University of Turku (Finland); Jivulescu, Maria A. [Department of Mathematics, University Politehnica Timisoara, 300006 Timisoara (Romania); Reeb, David; Wolf, Michael M. [Department of Mathematics, Technische Universitaet Muenchen, 85748 Garching (Germany)

    2012-10-15T23:59:59.000Z

    For a given set of input-output pairs of quantum states or observables, we ask the question whether there exists a physically implementable transformation that maps each of the inputs to the corresponding output. The physical maps on quantum states are trace-preserving completely positive maps, but we also consider variants of these requirements. We generalize the definition of complete positivity to linear maps defined on arbitrary subspaces, then formulate this notion as a semidefinite program, and relate it by duality to approximative extensions of this map. This gives a characterization of the maps which can be approximated arbitrarily well as the restriction of a map that is completely positive on the whole algebra, also yielding the familiar extension theorems on operator spaces. For quantum channel extensions and extensions by probabilistic operations we obtain semidefinite characterizations, and we also elucidate the special case of Abelian inputs or outputs. Finally, revisiting a theorem by Alberti and Uhlmann, we provide simpler and more widely applicable conditions for certain extension problems on qubits, and by using a semidefinite programming formulation we exhibit counterexamples to seemingly reasonable but false generalizations of the Alberti-Uhlmann theorem.

  1. Operational Security (OPSEC) Reminder | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Operational Security (OPSEC) Reminder Operational Security (OPSEC) Reminder June 3, 2014 - 1:24pm Addthis Operational Security (OPSEC) Reminder Operational Security (OPSEC)...

  2. FRMAC Operations Manual

    SciTech Connect (OSTI)

    Frandsen, K.

    2010-05-01T23:59:59.000Z

    In the event of a major radiological incident, the Federal Radiological Monitoring and Assessment Center (FRMAC) will coordinate the federal agencies that have various statutory responsibilities. The FRMAC is responsible for coordinating all environmental radiological monitoring, sampling, and assessment activities for the response. This manual describes the FRMAC’s response activities in a radiological incident. It also outlines how FRMAC fits in the National Incident Management System (NIMS) under the National Response Framework (NRF) and describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the affected areas. In the event of a potential or existing major radiological incident, the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is responsible for establishing and managing the FRMAC during the initial phases.

  3. RH Packaging Operations Manual

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2003-09-17T23:59:59.000Z

    This procedure provides operating instructions for the RH-TRU 72-B Road Cask, Waste Shipping Package. In this document, ''Packaging'' refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). ''Package'' refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Loading of the RH 72-B cask can be done two ways, on the RH cask trailer in the vertical position or by removing the cask from the trailer and loading it in a facility designed for remote-handling (RH). Before loading the 72-B cask, loading procedures and changes to the loading procedures for the 72-B cask must be sent to CBFO at sitedocuments@wipp.ws for approval.

  4. CONTRACTS AND PROCUREMENT OPERATIONS MANUAL

    E-Print Network [OSTI]

    de Lijser, Peter

    CONTRACTS AND PROCUREMENT OPERATIONS MANUAL California State University, Fullerton Division University, Fullerton Contracts and Procurement P a g e | 1 Table of Contents ALPHABETICAL INDEX OF TERMS.........................................................................................................................14 CONTRACTS AND PROCUREMENT OPERATIONS

  5. Operating Efficiency Comes From Teamwork

    E-Print Network [OSTI]

    Relyea, D. L.; Stone, A.

    A group of operating and planning personnel formed the INter Plant Utilities Team [INPUT] to improve energy efficiency and reliability for Exxon's Baytown, Texas, refinery and chemical plants complex. The Team coordinates the day-to-day operations...

  6. DOE Corporate Operating Experience Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-08T23:59:59.000Z

    The Order institutes a DOE wide program for the management of operating experience to prevent adverse operating incidents and facilitate the sharing of good work practices among DOE sites. Cancels DOE O 210.2.

  7. 500-kV Central Ferry Substation ...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Substation Y Y Central Ferry Substation T u c a n n o n R i v e r S n a k e R i v e r 12 U V 127 U V 127 U V 260 U V 261 12 Starbuck Starbuck W h i t m a n W h i t m a...

  8. KV-tOOJHfe Metallurgy Department

    E-Print Network [OSTI]

    .1. Fracture Testing 24 3.2. Fatigue Testing Using Offshore Load Spectrum .. 25 3.3. Brazing and Soldering 25 3 Research on Advanced Ceramic Materials 37 4.8. Developaent and Testing of Oxygen Sensors 38 FUEL ELEMENTS concentrated mainly on nuclear metallurgy to covering a number of different areas within ma- terials science

  9. Appendix A: STANDARD OPERATING PROCEDURES

    E-Print Network [OSTI]

    Ferrara, Katherine W.

    1 Appendix A: STANDARD OPERATING PROCEDURES A. STANDARD OPERATING PROCEDURES Standard Operating Procedures (SOP) are written safety and health guidelines for laboratory work with hazardous chemicals Procedures be written for hazardous chemicals when the chemical is used routinely in the laboratory and when

  10. Operating Reserves and Variable Generation

    SciTech Connect (OSTI)

    Ela, E.; Milligan, M.; Kirby, B.

    2011-08-01T23:59:59.000Z

    This report tries to first generalize the requirements of the power system as it relates to the needs of operating reserves. It also includes a survey of operating reserves and how they are managed internationally in system operations today and then how new studies and research are proposing they may be managed in the future with higher penetrations of variable generation.

  11. STANDARD OPERATING PROCEDURES Site Selection

    E-Print Network [OSTI]

    Fischer, Emily V.

    IMPROVE STANDARD OPERATING PROCEDURES SOP 126 Site Selection Date Last Modified Modified by: 09 References none #12;SOP 126: Site Selection 3 1.0 PURPOSE AND APPLICABILITY This standard operating procedure field conditions, and for ease of operation and maintenance. IMPROVE aerosol samplers are generally

  12. National Spherical Torus Experiment (NSTX) Construction, Commissioning, and Initial Operations

    E-Print Network [OSTI]

    Poloidal Field (PF) coils, thermal insulation, and a center stack casing which forms the inner wall vacuum insulator assemblies which permit the use of Coaxial Helicity Injection (CHI) as one of the means, 5 sec Coaxial Helicity Injection (CHI) 50kA injection @ 1kV Neutral Beam Injection Upgrade (NBI) 5

  13. National Spherical Torus Experiment (NSTX) Construction, Commissioning, and Initial Operations

    E-Print Network [OSTI]

    cylinder, a pair of inner Poloidal Field (PF) coils, thermal insulation, and a center stack casing which of the machine via ceramic insulator assemblies which permit the use of Coaxial Helicity Injection (CHI) as one, 5 sec Coaxial Helicity Injection (CHI) 50kA injection @ 1kV Neutral Beam Injection Upgrade (NBI) 5

  14. Drilling operations change gear

    SciTech Connect (OSTI)

    Moore, S.D.

    1982-08-01T23:59:59.000Z

    Predicts that several technological developments (e.g. measurement-while-drilling tools, computer data-gathering systems, improved drill bits, muds, downhole mud motors, and more efficient rigs) will have a major effect on drilling operations in the not-too-distant future. While several companies manufacture MWD systems and most can boast of successful runs, the major problem with the MWD system is cost. Manufacturers continue to make advances in both turbine and positive displacement mud motors. As the life span of downhole mud motors improves, these motors can economically compete with a rotary rig in drilling certain straight-hole intervals. Prototype bit designs include the use of lasers, electronic beams, flames, sparks, explosives, rocket exhaust, chains, projectiles, abrasive jets, and high-pressure erosion. Because drilling fluids are taking a large share of the drilling budget, mud engineers are trying to optimize costs, while maintaining well bore stability and increasing penetration rates. Many companies are taking the strategy of designing the simplest mud program possible and increasing additives only as needed. Air and foam drilling techniques are gaining attention. Concludes that as crude oil prices increase and the rig count begins to rebound, attention will once again turn to drilling technology and methodology.

  15. The higher spin Laplace operator

    E-Print Network [OSTI]

    Hendrik De Bie; David Eelbode; Matthias Roels

    2015-01-24T23:59:59.000Z

    This paper deals with a certain class of second-order conformally invariant operators acting on functions taking values in particular (finite-dimensional) irreducible representations of the orthogonal group. These operators can be seen as a generalisation of the Laplace operator to higher spin as well as a second order analogue of the Rarita-Schwinger operator. To construct these operators, we will use the framework of Clifford analysis, a multivariate function theory in which arbitrary irreducible representations for the orthogonal group can be realised in terms of polynomials satisfying a system of differential equations. As a consequence, the functions on which this particular class of operators act are functions taking values in the space of harmonics homogeneous of degree k. We prove the ellipticity of these operators and use this to investigate their kernel, focusing on both polynomial solutions and the fundamental solution.

  16. Liens for Oil and Gas Operations (Nebraska)

    Broader source: Energy.gov [DOE]

    This section contains regulations concerning lien allowances made to operators of oil and gas operations.

  17. Riser and wellhead monitoring for improved offshore drilling operations

    E-Print Network [OSTI]

    Nørvåg, Kjetil

    in mind during riser operations. Safe operation... ...deals with conduction the operation within operation

  18. Operators eye closer service relationships

    SciTech Connect (OSTI)

    Deffarges, E.H.; Ellis, P.A. (Booz Allen Hamilton Inc., Paris (France)); McArthur, N.C. (Booz Allen Hamilton Inc., Wassenaar (Netherlands))

    1994-09-19T23:59:59.000Z

    The use of integrated drilling services and alliance-type contracts has become economical and more practicable for many operators and service companies world-wide. The alliance-type contract provides a better balance of risks and rewards shared equally among all operator and contractor parties than many standard day rate and turnkey contracts. The general trend toward longer term contracts with fewer supply companies has helped numerous operators remain competitive. The paper discusses the trend toward increased partnerships and fewer suppliers.

  19. DOE limited standard: Operations assessments

    SciTech Connect (OSTI)

    NONE

    1996-05-01T23:59:59.000Z

    Purpose of this standard is to provide DOE Field Element assessors with a guide for conducting operations assessments, and provide DOE Field Element managers with the criteria of the EM Operations Assessment Program. Sections 6.1 to 6.21 provide examples of how to assess specific areas; the general techniques of operations assessments (Section 5) may be applied to other areas of health and safety (e.g. fire protection, criticality safety, quality assurance, occupational safety, etc.).

  20. Bohmian Mechanics with Discrete Operators

    E-Print Network [OSTI]

    R. A. Hyman; Shane A. Caldwell; Edward Dalton

    2004-01-02T23:59:59.000Z

    A deterministic Bohmian mechanics for operators with continuous and discrete spectra is presented. Randomness enters only through initial conditions. Operators with discrete spectra are incorporated into Bohmian mechanics by associating with each operator a continuous variable in which a finite range of the continuous variable correspond to the same discrete eigenvalue. In this way Bohmian mechanics can handle the creation and annihilation of particles. Examples are given and generalizations are discussed.

  1. SPECTR System Operational Test Report

    SciTech Connect (OSTI)

    W.H. Landman Jr.

    2011-08-01T23:59:59.000Z

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  2. Independent Oversight Review, Richland Operations Office and...

    Broader source: Energy.gov (indexed) [DOE]

    Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance Conduct of Operations f an independent oversight review of Richland Operations Office,...

  3. Independent Activity Report, Savannah River Operation - June...

    Broader source: Energy.gov (indexed) [DOE]

    Operation - June 2010 Independent Activity Report, Savannah River Operation - June 2010 June 2010 Savannah River Operations Office Self-Assessment of the Technical Qualification...

  4. All Night Study TSU Operations

    E-Print Network [OSTI]

    de Lijser, Peter

    All Night Study TSU Operations Student Engagement Report FY 2012-2013 Mission Statement The purpose. ASI Marketing and ASI Productions conduct promotional activities throughout the program, providing with ASI Marketing and TSU Operations to increase the number of promotional activities and study breaks

  5. TEELINDUSTRIAL OPERATING INSTRUCTIONS & PARTS MANUAL

    E-Print Network [OSTI]

    Kleinfeld, David

    -stage zoning applications in hydronic heating and cooling systems for residential, commercial and/or inTEELINDUSTRIAL SERIES OPERATING INSTRUCTIONS & PARTS MANUAL WATER CIRCULATING PUMPS MODELS 1P899A INSTRUCTIONS CAREFULLY BEFORE ATTEMPTING TO INSTALL, OPERATE, OR SERVICE TEEL PUMPS. PROTECT YOURSELF

  6. Optimization of Wind Turbine Operation

    E-Print Network [OSTI]

    Optimization of Wind Turbine Operation by Use of Spinner Anemometer TF Pedersen, NN Sørensen, L Title: Optimization of Wind Turbine Operation by Use of Spinner Anemometer Department: Wind Energy prototype wind turbine. Statistics of the yaw error showed an average of about 10°. The average flow

  7. Vehicle Operation and Parking Policy

    E-Print Network [OSTI]

    Vehicle Operation and Parking Policy Responsible Administrative Unit: Finance & Administration in this policy. 2.0 POLICY STATEMENT This policy is intended to promote safe driving by operators of all vehicles are in effect at all times and apply to all persons and vehicles physically present on the CSM campus

  8. Vehicle Operation and Parking Policy

    E-Print Network [OSTI]

    Vehicle Operation and Parking Policy Responsible Administrative Unit: Finance & Administration STATEMENT This policy is intended to promote safe driving by operators of all vehicles utilizing streets and apply to all persons and vehicles physically present on the CSM campus. For the purpose of this policy

  9. DOE Corporate Operating Experience Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-06-12T23:59:59.000Z

    The Order establishes a DOE wide program for management of operating experience to prevent adverse operating incidents and to expand the sharing of good work practices among DOE sites. Canceled by DOE O 210.2A. Does not cancel other directives.

  10. Transportation System Concept of Operations

    SciTech Connect (OSTI)

    N. Slater-Thompson

    2006-08-16T23:59:59.000Z

    The Nuclear Waste Policy Act of 1982 (NWPA), as amended, authorized the DOE to develop and manage a Federal system for the disposal of SNF and HLW. OCRWM was created to manage acceptance and disposal of SNF and HLW in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. This responsibility includes managing the transportation of SNF and HLW from origin sites to the Repository for disposal. The Transportation System Concept of Operations is the core high-level OCRWM document written to describe the Transportation System integrated design and present the vision, mission, and goals for Transportation System operations. By defining the functions, processes, and critical interfaces of this system early in the system development phase, programmatic risks are minimized, system costs are contained, and system operations are better managed, safer, and more secure. This document also facilitates discussions and understanding among parties responsible for the design, development, and operation of the Transportation System. Such understanding is important for the timely development of system requirements and identification of system interfaces. Information provided in the Transportation System Concept of Operations includes: the functions and key components of the Transportation System; system component interactions; flows of information within the system; the general operating sequences; and the internal and external factors affecting transportation operations. The Transportation System Concept of Operations reflects OCRWM's overall waste management system policies and mission objectives, and as such provides a description of the preferred state of system operation. The description of general Transportation System operating functions in the Transportation System Concept of Operations is the first step in the OCRWM systems engineering process, establishing the starting point for the lower level descriptions. of subsystems and components, and the Transportation System Requirements Document. Other program and system documents, plans, instructions, and detailed designs will be consistent with and informed by the Transportation System Concept of Operations. The Transportation System Concept of Operations is a living document, enduring throughout the OCRWM systems engineering lifecycle. It will undergo formal approval and controlled revisions as appropriate while the Transportation System matures. Revisions will take into account new policy decisions, new information available through system modeling, engineering investigations, technical analyses and tests, and the introduction of new technologies that can demonstrably improve system performance.

  11. Chapter 9 -Forklift Operations Forklift Operations Safety Rules

    E-Print Network [OSTI]

    , or hazardous locations. 19. Operators should not put their fingers, arms, or legs between the uprights that horn, lights, brakes, tires, gas supply, hydraulic lines, etc. are in safe working condition. Employees

  12. Operating in the Caspian environment

    SciTech Connect (OSTI)

    Kristoffersen, B.; Rogers, L.

    1996-11-01T23:59:59.000Z

    The Azerbaijan International Operating Company (AIOC) is currently developing oil production from three oil fields in the Caspian Sea. The activities are guided by a comprehensive Environmental Management System adopted to the uniqueness of the Caspian and the historical and political situation in Azerbaijan. The paper discusses the challenges of operating in the Caspian region with a focus on local involvement connected to environmental literature data review and environmental impact assessment. Local involvement and training is concluded to be one key to success for operations in an environmental sensitive region like the Caspian.

  13. Training For Radiation Emergencies, First Responder Operations...

    Energy Savers [EERE]

    Training For Radiation Emergencies, First Responder Operations - Instructors Guide Training For Radiation Emergencies, First Responder Operations - Instructors Guide COURSE...

  14. Enterprise Assessments Operational Awareness Record, Waste Treatment...

    Energy Savers [EERE]

    March 2015 Enterprise Assessments Operational Awareness Record, Waste Treatment and Immobilization Plant - March 2015 March 2015 Enterprise Assessments Operational Awareness...

  15. Enterprise Assessments Operational Awareness Record, Argonne...

    Energy Savers [EERE]

    Operational Awareness Record, Argonne National Laboratory and New Brunswick Laboratory - March 2015 Enterprise Assessments Operational Awareness Record, Argonne National Laboratory...

  16. Operations and Maintenance Program Measurement

    Broader source: Energy.gov [DOE]

    Operations and maintenance (O&M) measurement tends to focus on reliability as the sole metric. Every Federal agency wants a reliable facility, but this metric alone is not enough to build a...

  17. Operations and Maintenance Management Support

    Broader source: Energy.gov [DOE]

    Federal operations and maintenance (O&M) programs must gain full support from management to succeed. Management understanding and buying into the program elevates O&M importance and allows...

  18. Reactor operation safety information document

    SciTech Connect (OSTI)

    Not Available

    1990-01-01T23:59:59.000Z

    The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

  19. Advanced control documentation for operators

    SciTech Connect (OSTI)

    Ayral, T.E. (Mobil Oil, Torrance, CA (US)); Conley, R.C. (Profimatics, Inc., Thousand Oaks, CA (US)); England, J.; Antis, K. (Ashland Oil, Ashland, KY (US))

    1988-09-01T23:59:59.000Z

    Advanced controls were implemented on Ashland Oil's Reduced Crude Conversion (RCC) and Metals Removal System (MRS) units, the RCC and MRS main fractionators and the unit gas plant. This article describes the format used for the operator documentation at Ashland. Also, a potential process unit problem is described which can be solved by good operator documentation. The situation presented in the paper is hypothetical, however,the type of unit upset described an occur if proper precautions are not taken.

  20. Conduct of operations implementation plan

    SciTech Connect (OSTI)

    Anderson, C.K.; Hall, R.L.

    1991-02-20T23:59:59.000Z

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  1. Lease Operations Environmental Guidance Document

    SciTech Connect (OSTI)

    Bureau of Land Management

    2001-02-14T23:59:59.000Z

    This report contains discussions in nine different areas as follows: (1) Good Lease Operating Practices; (2) Site Assessment and Sampling; (3) Spills/Accidents; (4) Containment and Disposal of Produced Waters; (5) Restoration of Hydrocarbon Impacted Soils; (6) Restoration of Salt Impacted Soils; (7) Pit Closures; (8) Identification, Removal and Disposal of Naturally Occurring Radioactive Materials (NORM); and (9) Site Closure and Construction Methods for Abandonment Wells/Locations. This report is primary directed towards the operation of oil and gas producing wells.

  2. TFTR tritium operations lessons learned

    SciTech Connect (OSTI)

    Gentile, C.A.; Raftopoulos, S.; LaMarche, P. [Princeton Plasma Physics Lab., NJ (United States)] [and others

    1996-12-31T23:59:59.000Z

    The Tokamak Fusion Test Reactor which is the progenitor for full D-T operating tokamaks has successfully processed > 81 grams of tritium in a safe and efficient fashion. Many of the fundamental operational techniques associated with the safe movement of tritium through the TFTR facility were developed over the course of many years of DOE tritium facilities (LANL, LLNL, SRS, Mound). In the mid 1980`s The Tritium Systems Test Assembly (TSTA) at LANL began reporting operational techniques for the safe handling of tritium, and became a major conduit for the transfer of safe tritium handling technology from DOE weapons laboratories to non-weapon facilities. TFTR has built on many of the TSTA operational techniques and has had the opportunity of performing and enhancing these techniques at America`s first operational D-T fusion reactor. This paper will discuss negative pressure employing `elephant trunks` in the control and mitigation of tritium contamination at the TFTR facility, and the interaction between contaminated line operations and {Delta} pressure control. In addition the strategy employed in managing the movement of tritium through TFTR while maintaining an active tritium inventory of < 50,000 Ci will be discussed. 5 refs.

  3. operations

    National Nuclear Security Administration (NNSA)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartmentNationalRestart of the Review of theOFFICE OF8/%2A ennike | National7/%2A en8/%2A

  4. An operational analysis of flashing traffic signal operation

    E-Print Network [OSTI]

    Benz, Robert Joseph

    1993-01-01T23:59:59.000Z

    AN OPERATIONAL ANALYSIS OF FLASHING TRAFFIC SIGNAL OPERATION A Thesis by ROBERT JOSEPH BENZ Submitted to the Office of Graduate Studies of Texas AEcM University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE... street volumes are below 250 vph per approach and for main street volume of 500 vph per approach when the main/minor street volume ratio is above two. The volume range exceeds the Warrant 1 the minimum volume warrant for traffic signal installation...

  5. Inverse operator representations of quantum phase

    E-Print Network [OSTI]

    G. M. Saxena

    2008-03-14T23:59:59.000Z

    We define quantum phase in terms of inverses of annihilation and creation operators. We show that like Susskind - Glogower phase operators, the measured phase operators and the unitary phase operators can be defined in terms of the inverse operators. However, for the unitary phase operator the Hilbert space includes the negative energy states. The quantum phase in inverse operator representation may find the applications in the field of quantum optics particularly in the squeezed states.

  6. OPERATOR PERFORMANCE IN LONG DURATION, LOW TASK LOAD CONTROL OPERATIONS

    E-Print Network [OSTI]

    Cummings, Mary "Missy"

    and conducted. Overall, 36 participants operated a digital nuclear power plant control workstation simulation In the United States, a major effort is underway to modernize existing nuclear power plants and their control rooms, as well as design new, advanced nuclear power plants. Current control rooms for nuclear power

  7. Southern Illinois University Watercraft & Equipment Operating Boat Operation Eligibility

    E-Print Network [OSTI]

    that a stream of water is flowing from the motor for engine cooling. 8. Click in gear hard, don't grind. D the Illinois Boaters Safety Exam. General Boating Safety Guidelines All boat operations must comply with state is in distress, a fire extinguisher and engine cut-off safety lanyard for all boats with internal combustion

  8. Performing a local barrier operation

    DOE Patents [OSTI]

    Archer, Charles J; Blocksome, Michael A; Ratterman, Joseph D; Smith, Brian E

    2014-03-04T23:59:59.000Z

    Performing a local barrier operation with parallel tasks executing on a compute node including, for each task: retrieving a present value of a counter; calculating, in dependence upon the present value of the counter and a total number of tasks performing the local barrier operation, a base value of the counter, the base value representing the counter's value prior to any task joining the local barrier; calculating, in dependence upon the base value and the total number of tasks performing the local barrier operation, a target value, the target value representing the counter's value when all tasks have joined the local barrier; joining the local barrier, including atomically incrementing the value of the counter; and repetitively, until the present value of the counter is no less than the target value of the counter: retrieving the present value of the counter and determining whether the present value equals the target value.

  9. Performing a local barrier operation

    DOE Patents [OSTI]

    Archer, Charles J; Blocksome, Michael A; Ratterman, Joseph D; Smith, Brian E

    2014-03-04T23:59:59.000Z

    Performing a local barrier operation with parallel tasks executing on a compute node including, for each task: retrieving a present value of a counter; calculating, in dependence upon the present value of the counter and a total number of tasks performing the local barrier operation, a base value, the base value representing the counter's value prior to any task joining the local barrier; calculating, in dependence upon the base value and the total number of tasks performing the local barrier operation, a target value of the counter, the target value representing the counter's value when all tasks have joined the local barrier; joining the local barrier, including atomically incrementing the value of the counter; and repetitively, until the present value of the counter is no less than the target value of the counter: retrieving the present value of the counter and determining whether the present value equals the target value.

  10. PEATGAS pilot plant operating results

    SciTech Connect (OSTI)

    Biljetina, R.; Punwani, D.

    1982-08-01T23:59:59.000Z

    The Institute of Gas Technology has been developing the PEATGAS process for the conversion of peat to synthetic fuels. A program has recently been completed for the pilot-plant-scale testing of the process. In this scheme, peat is gasified in a two-stage reactor system, which operates at temperatures up to 1750/sup 0/F and pressures up to 500 psig. The process can be controlled to maximize the production of either substitute natural gas (SNG) or liquid hydrocarbons. The technical feasibility of the process was demonstrated in a series of five gasification tests. Highlights of this operating program are presented in this paper.

  11. PEATGAS pilot plant operating results

    SciTech Connect (OSTI)

    Biljetina, R.; Punwani, D.

    1982-01-01T23:59:59.000Z

    The Institute of Gas Technology has been developing the PEATGAS process for the conversion of peat to synthetic fuels. A program has recently been completed for the pilot-plant-scale testing of the process. In this scheme, peat is gasified in a two-stage reactor system, which operates at temperatures up to 1750/sup 0/F and pressures up to 500 psig. The process can be controlled to maximize the production of either substitute natural gas (SNG) or liquid hydrocarbons. The technical feasibility of the process was demonstrated in a series of five gasification tests. Highlights of this operating program are presented in this paper.

  12. Electric Vehicle Site Operator Program

    SciTech Connect (OSTI)

    Not Available

    1992-01-01T23:59:59.000Z

    Kansas State University, with funding support from federal, state, public, and private companies, is participating in the Department of Energy's Electric Vehicle Site Operator Program. Through participation is this program, Kansas State is demonstrating, testing, and evaluating electric or hybrid vehicle technology. This participation will provide organizations the opportunity to examine the latest EHV prototypes under actual operating conditions. KSU proposes to purchase one (1) electric or hybrid van and four (4) electric cars during the first two years of this five year program. KSU has purchased one G-Van built by Conceptor Industries, Toronto, Canada and has initiated a procurement order to purchase two (2) Soleq 1992 Ford EVcort stationwagons.

  13. SAFETY MANAGEMENT MANUAL OSU SHIP OPERATIONS

    E-Print Network [OSTI]

    Kurapov, Alexander

    The operation of the A-frame and Hydro Boom in the conduct of ship's work and training other personnelSAFETY MANAGEMENT MANUAL OSU SHIP OPERATIONS 6.5 A-FRAME AND BOOM OPERATIONS Originator: Approved Boom operations and the qualification for training operators on the R/V Oceanus. 6.5.2 Responsibility

  14. VICE PRESIDENT FINANCE, RESOURCES & OPERATIONS

    E-Print Network [OSTI]

    Handy, Todd C.

    VICE PRESIDENT FINANCE, RESOURCES & OPERATIONS PIERRE OUILLET EA to VP Carolina Cerna ASSOCIATE VP ADMINISTRATION & FINANCE OKANAGAN CAMPUS Jackie Podger Michael Shakespeare (Interim) ASSOCIATE VP CAMPUS Dennis Silva FINANCE UBCO Carla Waters FINANCE UBCO Carla Waters BUDGET AND MGMT REPORTING Andrew Glynn

  15. Auditing of Programs and Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-11-09T23:59:59.000Z

    To set forth audit requirements and responsibilities for the promotion of economy and efficiency in the administration of or the prevention or detection of fraud, waste, and abuse in programs and operations of the Department of Energy. Cancels DOE O 224.2.

  16. Safety of Nuclear Explosive Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-08-07T23:59:59.000Z

    This directive establishes responsibilities and requirements to ensure the safety of routine and planned nuclear explosive operations and associated activities and facilities. Cancels DOE O 452.2A and DOE G 452.2A-1A. Canceled by DOE O 452.2C.

  17. Richland Operations Office technology summary

    SciTech Connect (OSTI)

    Not Available

    1994-05-01T23:59:59.000Z

    This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

  18. Emergency Operating Records Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1991-10-23T23:59:59.000Z

    To establish the policy, responsibilities, and requirements for a Departmental Emergency Operating Records Protection Program to safeguard that core or records deemed necessary to assure continuity of essential Governmental activities during and following disaster and attack-related emergency conditions. Cancels DOE 5500.7A. Chanceled by DOE O 151.1 of 9-25-1995.

  19. Cooperative Education Detailed Operational Procedures

    E-Print Network [OSTI]

    de Doncker, Elise

    credits of Cooperative education for one of the required elective courses in the ME programME 3990 Cooperative Education Detailed Operational Procedures Overview Cooperative education and Aeronautical Engineering faculty. Cooperative education is not a required component of the ME program

  20. Auditing of Programs and Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-03-22T23:59:59.000Z

    To set forth audit responsibilities for the promotion of economy and efficiency in the administration of, or the prevention or detection of fraud, waste, and abuse in, programs and operations of the Department of Energy (DOE). Cancels DOE 2321.1B. Canceled by DOE O 224.2A.

  1. Chief Operating Officer Joe Bengfort

    E-Print Network [OSTI]

    Yamamoto, Keith

    Virtualization Engineer Jason Braatz Virtualization Engineer Dong Tran Sr. Intel/Citrix Systems Engineer Mark/Citrix Systems Engineer Hossain Bayat Sr. Desktop Systems Engineer Christopher Hester Desktop Systems Engineer Karen O'Neill Director ­ IT Operations Mark Uchi Field Services Manager Michael Fernandez FS Technical

  2. EMISSIONS TO AIR OPERATIONAL PROCEDURE

    E-Print Network [OSTI]

    Harman, Neal.A.

    EMISSIONS TO AIR OPERATIONAL PROCEDURE Swansea University Estates Services Singleton Park Swansea to Air Department: Estates and Facilities Site: All Author: Ambreen Jahangir Approved by: Mark Durdin PURPOSE: To minimise emissions and discharges to air from boilers, fume cupboards, air conditioning

  3. DIVING OPERATIONS 30.A GENERAL

    E-Print Network [OSTI]

    US Army Corps of Engineers

    as in the contract, using the particular diving techniques and equipment to be used under the contract. Divers shall demonstrate that at least one (1) of the four (4) qualification dives was performed in the last 6 months prior to the start of dive operations. The DDC will ensure USACE divers meet the training and qualification

  4. Operation REDWING 1956. Technical report

    SciTech Connect (OSTI)

    Bruce-Henderson, S.; Gladeck, F.R.; Hallowell, J.H.; Martin, E.J.; McMullan, F.W.

    1982-08-01T23:59:59.000Z

    REDWING was a 17-detonation atmospheric nuclear weapons test series conducted in the Marshall Islands at Enewetak and Bikini atolls in spring and summer 1956. This is a report of DOD personnel in REDWING with an emphasis on operations and radiological safety.

  5. Reliability Assessment Incorporating Operational Considerations and Economic

    E-Print Network [OSTI]

    PSERC Reliability Assessment Incorporating Operational Considerations and Economic Aspects Engineering Research Center Reliability Assessment Incorporating Operational Considerations and Economic Center (PSERC) research project titled "Reliability Assessment Incorporating Operational Considerations

  6. Utility vehicle safety Operator training program

    E-Print Network [OSTI]

    Minnesota, University of

    Utility vehicle safety Operator training program #12;Permissible use Utility Vehicles may only Utility Vehicle operator · When equipped with the "Required Equipment" · On public roadways within Drivers" · Obey all traffic regulations · Trained; update training every two years · Operate vehicles

  7. LANL continuity of operations plan

    SciTech Connect (OSTI)

    Senutovitch, Diane M [Los Alamos National Laboratory

    2010-12-22T23:59:59.000Z

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an allhazards event, including a national security emergency, major fire, catastrophic natural disaster, man-made disaster, terrorism event, or technological disaster by rendering LANL buildings, infrastructure, or Technical Areas unsafe, temporarily unusable, or inaccessible.

  8. Extending the Operating Lives of Materials

    ScienceCinema (OSTI)

    Paul Jablonski

    2010-09-01T23:59:59.000Z

    Metallurgist Paul Jablonski discusses his role in developing processes that extend the operating temperatures and operating lives of materials used in energy applications.

  9. Operating Experience Summary, 2013-03

    Broader source: Energy.gov (indexed) [DOE]

    Investigation: Contamination at Los Alamos Neutron Science Center Due to Deficiencies in Conduct of Operations ...5 Page 1 Page 5 Page 1 of 12 Operating Experience Summary...

  10. Independent Activity Report, Hanford Operations Office - July...

    Broader source: Energy.gov (indexed) [DOE]

    assessment included evaluation of work control, fall protection, quality assurance, and conduct of operations. Independent Activity Report, Hanford Operations Office - July 2010...

  11. Independent Oversight Review, Savannah River Operations Office...

    Energy Savers [EERE]

    Savannah River Operations Office - July 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 July 2013 Review of the Employee Concerns Program at the...

  12. Extending the Operating Lives of Materials

    SciTech Connect (OSTI)

    Paul Jablonski

    2010-01-26T23:59:59.000Z

    Metallurgist Paul Jablonski discusses his role in developing processes that extend the operating temperatures and operating lives of materials used in energy applications.

  13. Enterprise Assessments Operational Awareness Record, Waste Isolation...

    Energy Savers [EERE]

    Operational Awareness Record, Waste Isolation Pilot Plant - March 2015 Enterprise Assessments Operational Awareness Record, Waste Isolation Pilot Plant - March 2015 March 2015...

  14. THE MECHANICAL DESIGN AND FABRICATION OF A CONVECTIVELY COOLED ION ACCELERATOR FOR CONTINUOUSLY OPERATING NEUTRAL BEAM SYSTEMS

    E-Print Network [OSTI]

    Paterson, J.A.

    2012-01-01T23:59:59.000Z

    100 kV 1. 5 sec Table 1. Grid heat loads as %beam power. Towith a central separation. Grid heat loading is the dominantsystem. To investigate grid heat loads on our grid designs

  15. Operator entanglement of two-qubit joint unitary operations revisited: Schmidt number approach

    E-Print Network [OSTI]

    Hui-Zhi Xia; Chao Li; Qing Yang; Ming Yang; Zhuo-Liang Cao

    2012-04-04T23:59:59.000Z

    Operator entanglement of two-qubit joint unitary operations is revisited. Schmidt number is an important attribute of a two-qubit unitary operation, and may have connection with the entanglement measure of the unitary operator. We found the entanglement measure of two-qubit unitary operators is classified by the Schmidt number of the unitary operators. The exact relation between the operator entanglement and the parameters of the unitary operator is clarified too.

  16. Reactor operation environmental information document

    SciTech Connect (OSTI)

    Haselow, J.S.; Price, V.; Stephenson, D.E.; Bledsoe, H.W.; Looney, B.B.

    1989-12-01T23:59:59.000Z

    The Savannah River Site (SRS) produces nuclear materials, primarily plutonium and tritium, to meet the requirements of the Department of Defense. These products have been formed in nuclear reactors that were built during 1950--1955 at the SRS. K, L, and P reactors are three of five reactors that have been used in the past to produce the nuclear materials. All three of these reactors discontinued operation in 1988. Currently, intense efforts are being extended to prepare these three reactors for restart in a manner that protects human health and the environment. To document that restarting the reactors will have minimal impacts to human health and the environment, a three-volume Reactor Operations Environmental Impact Document has been prepared. The document focuses on the impacts of restarting the K, L, and P reactors on both the SRS and surrounding areas. This volume discusses the geology, seismology, and subsurface hydrology. 195 refs., 101 figs., 16 tabs.

  17. Office of Headquarters Security Operations

    Broader source: Energy.gov [DOE]

    The Office of Headquarters Security Operations strengthens national security by protecting personnel, facilities, property, classified information, and sensitive unclassified information for DOE Headquarters facilities in the National Capital Area under normal and abnormal (i.e., emergency) conditions; managing access authorization functions for Headquarters; ensuring that executives and dignitaries are fully protected, and supporting efforts to ensure the continuity of government in all circumstances as mandated by Presidential Decision Directive.

  18. A cask fleet operations study

    SciTech Connect (OSTI)

    Not Available

    1988-03-01T23:59:59.000Z

    This document describes the cask fleet currently available to transport spent nuclear fuels. The report describes the proposed operational procedures for these casks and the vehicles intended to transport them. Included are techniques for loading the cask, lifting it onto the transport vehicle, preparing the invoices, and unloading the cask at the destination. The document concludes with a discussion on the maintenance and repair of the casks. (tem) 29 figs.

  19. State Energy Program Operations Manual

    SciTech Connect (OSTI)

    Office of Building Technology, State and Community Programs

    1999-03-17T23:59:59.000Z

    The State Energy Program Operations Manual is a reference tool for the states and the program officials at the U.S. Department of Energy's Office of Building Technology, State and Community Programs and Regional Support Offices as well as State Energy Offices. The Manual contains information needed to apply for and administer the State Energy Program, including program history, application rules and requirements, and program administration and monitoring requirements.

  20. Business Operations | Department of Energy

    Energy Savers [EERE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orA BRIEFAprilBudgetAbout »Operations »

  1. Businss Operations Calendar: YY 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAboutScienceCareersEnergy,ServicesBurningOperations

  2. TEMPERED OPERATORS AND THE HEAT KERNEL AND COMPLEX POWERS OF ELLIPTIC PSEUDODIFFERENTIAL OPERATORS

    E-Print Network [OSTI]

    Loya, Paul

    TEMPERED OPERATORS AND THE HEAT KERNEL AND COMPLEX POWERS OF ELLIPTIC PSEUDODIFFERENTIAL OPERATORS operator and complex powers of b-pseudodi#27;erential operators, as the heat operator and complex powers are the Laplace and Mellin transforms, respectively, of the resolvent. The heat operator and complex powers

  3. Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 The 2002 WholesaleEnergy'sRunning jobsOPERATING PLAN 573.1-207

  4. Operations, OPS, Accelerator and Beam Science, ABS, Accelerator Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 The 2002 WholesaleEnergy'sRunningOperations Two Argonne teams

  5. ARM Climate Research Facility Radar Operations Plan

    SciTech Connect (OSTI)

    Voyles, JW

    2012-05-18T23:59:59.000Z

    Roles, responsibilities, and processes associated with Atmospheric Radiation Measurement (ARM) Radar Operations.

  6. Utrecht University Close Co-operation

    E-Print Network [OSTI]

    Utrecht, Universiteit

    Utrecht University Close Co-operation #12;1 CloseCo-operation Preface 3 TheNextGeneration 18 Facts&Figures 20 Faculty Humanities 4 Faculty Geosciences 6 Faculty Medicine/UniversityMedicalCenter Utrecht 8 VeterinaryMedicine 16 Contents Utrecht University CloseCo-operation #12;3 CloseCo-operation It is a great

  7. Guide to good practices for operations turnover

    SciTech Connect (OSTI)

    Not Available

    1993-06-01T23:59:59.000Z

    This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Turnover, Chapter XII of Department of Energy (DOE) Order 5480.19, ``Conduct of Operations Requirements for DOE Facilities``. The practices in this guide should be considered when planning or reviewing operations turnover programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. ``Operations Turnover`` is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a formal operations turnover program to promote safe and efficient operations.

  8. Guide to good practices for operations turnover

    SciTech Connect (OSTI)

    Not Available

    1993-06-01T23:59:59.000Z

    This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Turnover, Chapter XII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities''. The practices in this guide should be considered when planning or reviewing operations turnover programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Operations Turnover'' is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a formal operations turnover program to promote safe and efficient operations.

  9. Guide to good practices for operations turnover

    SciTech Connect (OSTI)

    NONE

    1998-12-01T23:59:59.000Z

    This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Turnover, Chapter XII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing operations turnover programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Operations Turnover is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a formal operations turnover program to promote safe and efficient operations.

  10. Compact bilinear operators and commutators

    E-Print Network [OSTI]

    Bé nyi, Á rpá d; Torres, Rodolfo H.

    2013-07-01T23:59:59.000Z

    ) For all bounded B1 ? X,B2 ? Y , T (B1 ×B2) is precompact. (c7) For all bounded sequences {(xn, yn)} ? X × Y , the sequence {T (xn, yn)} has a convergent subsequence. Furthermore, if Z is Banach, then (c1) is also equivalent to: (c8) For all bounded B ? X...(X ×Y, Z) ? B(X ×Y, Z), assume that the compact bilinear operator T is not bounded. Then, for some r > 0, there exists a sequence (xn, yn) ? Br,X×Y , and ?T (xn, yn)? ? ?. Thus, {T (xn, yn)} could not have a convergent subsequence, so T (Br,X×Y ) would...

  11. First Wall and Operational Diagnostics

    SciTech Connect (OSTI)

    Lasnier, C; Allen, S; Boedo, J; Groth, M; Brooks, N; McLean, A; LaBombard, B; Sharpe, J; Skinner, C; Whyte, D; Rudakov, D; West, W; Wong, C

    2006-06-19T23:59:59.000Z

    In this chapter we review numerous diagnostics capable of measurements at or near the first wall, many of which contribute information useful for safe operation of a tokamak. There are sections discussing infrared cameras, visible and VUV cameras, pressure gauges and RGAs, Langmuir probes, thermocouples, and erosion and deposition measurements by insertable probes and quartz microbalance. Also discussed are dust measurements by electrostatic detectors, laser scattering, visible and IR cameras, and manual collection of samples after machine opening. In each case the diagnostic is discussed with a view toward application to a burning plasma machine such as ITER.

  12. CNMS Operations/ESH Highlights

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed New Substation Sites Proposed Route BTRIC CNMS CSMBLynda NicelyAnalysisOperations/ESH

  13. Operating Ground Rules - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Regionat CornellInternships, ScholarshipsSpeedingOilOnlineOperating

  14. Operation Periods: Single Column Model

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 The 2002 WholesaleEnergy'sRunning jobsOPERATING PLAN 573.1-2

  15. Operations Division at Berkeley Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 The 2002 WholesaleEnergy'sRunning jobsOPERATING PLANOperations at

  16. APS Long Range Operations Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNGExperience4AJ01) (See95TI07)Operations2AP-XPSAPS Floor Coordinators5) Alternate

  17. Operations Division at Berkeley Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 TechnicalOilOnlineandOperations Safety ISM Plan

  18. AEC and Oak Ridge Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNGExperience4AJ01) (See95TI07)Operations During the months between August 1, 1946

  19. Operator Ideals in Lipschitz and Operator Spaces Categories

    E-Print Network [OSTI]

    Chavez Dominguez, Javier

    2012-10-19T23:59:59.000Z

    ) = outdegree(y0) and indegree(y0) = 0. Therefore, m = X (x;y)2E m(y) (y) m(x) (x) myx (2.3.1) 20 and thus kmk X (x;y)2E m(y) (y) m(x) (x) d(y; x) = kj(m)k‘1(E;G) : Now, consider x; y 2 X. Let n = d(x; y) and fx = z0... results similar to those in the linear case. We follow closely the presentation of [Rya02, Sec. 2.1] Let us start with what could be called \\projective tensor products of operators". Compare to [Rya02, Prop. 2.3]. Proposition 2.3.6. Let S : X ! Z be a...

  20. Stack Monitor Operating Experience Review

    SciTech Connect (OSTI)

    L. C. Cadwallader; S. A. Bruyere

    2009-05-01T23:59:59.000Z

    Stack monitors are used to sense radioactive particulates and gases in effluent air being vented from rooms of nuclear facilities. These monitors record the levels and types of effluents to the environment. This paper presents the results of a stack monitor operating experience review of the U.S. Department of Energy (DOE) Occurrence Reporting and Processing System (ORPS) database records from the past 18 years. Regulations regarding these monitors are briefly described. Operating experiences reported by the U.S. DOE and in engineering literature sources were reviewed to determine the strengths and weaknesses of these monitors. Electrical faults, radiation instrumentation faults, and human errors are the three leading causes of failures. A representative “all modes” failure rate is 1E-04/hr. Repair time estimates vary from an average repair time of 17.5 hours (with spare parts on hand) to 160 hours (without spare parts on hand). These data should support the use of stack monitors in any nuclear facility, including the National Ignition Facility and the international ITER project.

  1. Miniature electrically operated diaphragm valve

    DOE Patents [OSTI]

    Adkins, Douglas R. (Albuquerque, NM); Spletzer, Barry L. (Albuquerque, NM); Wong, Chungnin C. (Albuquerque, NM); Frye-Mason, Gregory C. (Cedar Crest, NM); Fischer, Gary J. (Albuquerque, NM); Hesketh, Peter J. (Atlanta, GA)

    2001-01-01T23:59:59.000Z

    The present invention provides a miniature electrically operated valve that can stand off significant pressures, that can be inexpensively produced, and that can be made to operate without continuous electrical power. A valve according to the present invention comprises a housing and a beam mounted with the housing. A diaphragm mounted with the housing forms a sealed fluid volume. An electromagnetic energy source, such as an electromagnetic coil, mounts with the housing and when energized urges the beam in one direction. The beam can be urged in the opposing direction by passive means or by reversing the polarity of the electromagnetic energy source or by a second electromagnetic energy source. Two fluid ports mount with the housing. A first fluid port mounts so that, as the beam is urged in one direction or the opposite, the beam urges the diaphragm to move between engaging and substantially sealing the fluid port and disengaging and not substantially sealing the fluid port. A seat can be mounted with the diaphragm to aid in sealing the fluid port. Latching mechanisms such as permanent magnets can be mounted so that the valve remains in the open or closed positions without continuous electrical power input. Fluid can flow through the housing between the two fluid ports when the diaphragm does not seal the first fluid port, but can be prevented from flowing by urging the beam so that the diaphragm seals the first fluid port. Various embodiments accommodate various latching mechanisms, electromagnetic energy sources, number of fluid ports, and diaphragm design considerations.

  2. Thailand gas project now operational

    SciTech Connect (OSTI)

    Horner, C.

    1982-08-01T23:59:59.000Z

    Now operational, Phase 1 of Thailand's first major natural gas system comprises one of the world's longest (264 miles) offshore gas lines. Built for the Petroleum Authority of Thailand (PTT), this system delivers gas from the Erawan field in the Gulf of Thailand to two electrical power plants near Bangkok, operated by the Electricity Generating Authority of Thailand (EGAT). The project required laying about 360 miles of pipeline, 34-in., 0.625 in.-thick API-5LX-60 pipe offshore and 28-in., 0.406 in.-thick API-5LX-60 onshore. The offshore pipe received a coal-tar coating, a 3.5-5.0 in. concrete coating, and zinc sacrificial-anode bracelets. The onshore line was coated with the same coal-tar enamel and, where necessary, with concrete up to 4.5 in. thick. Because EGAT's two power plants are the system's only customers, no more pipeline will be constructed until deliveries, currently averaging about 100 million CF/day, reach the 250 million CF/day level. The project's second phase will include additional pipelines as well as an onshore distribution network to industrial customers.

  3. PEP-II Operations Report

    SciTech Connect (OSTI)

    Zisman, Michael S.

    2000-11-01T23:59:59.000Z

    PEP-II is a two-ring asymmetric B factory operating at the Upsilon(4S) resonance. It was constructed by a SLAC-LBNL-LLNL collaboration. The collider comprises two rings, a High-Energy Ring (HER) storing 9 GeV electrons, and a Low-Energy Ring (LER) storing 3.1 GeV positrons. Commissioning of the HER began in mid-1997 and commissioning of the LER began in mid-1998. First evidence for collisions was obtained on July 23, 1998. The BaBar detector was installed in early 1999, and commissioning with the detector commenced in May 1999. By September 1999, PEP-II had reached a peak luminosity of 1.35 x 10{sup 33} cm{sup {minus}2} s{sup {minus}1}. In the present run, which began in October 1999, the peak luminosity has reached 3.1 x 10{sup 33} cm{sup {minus}2} s{sup {minus}1} and the integrated luminosity delivered is 25 fb{sup {minus}1}. At present, PEP-II is the world's highest luminosity collider. In this paper we describe the startup experience and summarize the operational experience during fiscal year 2000 (from October 1999 through September 2000). Plan s for luminosity upgrades are briefly described.

  4. Operations & Maintenance Best Practices Guide: Release 3.0

    Broader source: Energy.gov (indexed) [DOE]

    - To ensure effective implementation and control of operation activities. * Conduct of Operations - To ensure efficient, safe, and reliable process operations. *...

  5. The Technology of Cyber Operations Symposium on Cyber Operations and National

    E-Print Network [OSTI]

    operations can be conducted with plausible deniability But adversaries make mistakes too, and allThe Technology of Cyber Operations Herb Lin Symposium on Cyber Operations and National Security not acknowledge role of offensive operations. · Offensive cyber operations can also have non-defensive purposes

  6. Augmented reality building operations tool

    DOE Patents [OSTI]

    Brackney, Larry J.

    2014-09-09T23:59:59.000Z

    A method (700) for providing an augmented reality operations tool to a mobile client (642) positioned in a building (604). The method (700) includes, with a server (660), receiving (720) from the client (642) an augmented reality request for building system equipment (612) managed by an energy management system (EMS) (620). The method (700) includes transmitting (740) a data request for the equipment (612) to the EMS (620) and receiving (750) building management data (634) for the equipment (612). The method (700) includes generating (760) an overlay (656) with an object created based on the building management data (634), which may be sensor data, diagnostic procedures, or the like. The overlay (656) is configured for concurrent display on a display screen (652) of the client (642) with a real-time image of the building equipment (612). The method (700) includes transmitting (770) the overlay (656) to the client (642).

  7. Spectral Functions of Singular Operators

    E-Print Network [OSTI]

    Pablo Pisani

    2014-10-28T23:59:59.000Z

    The asymptotic expansion of the heat-kernel for small values of its argument has been studied in many different cases and has been applied to 1-loop calculations in Quantum Field Theory. In this thesis we consider this asymptotic behavior for certain singular differential operators which can be related to quantum fields on manifolds with conical singularities. Our main result is that, due to the existence of this singularity and of infinitely many boundary conditions of physical relevance related to the admissible behavior of the fields on the singular point, the heat-kernel has an "unusual" asymptotic expansion. We describe examples where the heat-kernel admits an asymptotic expansion in powers of its argument whose exponents depend on "external" parameters. As far as we know, this kind of asymptotics had not been found and therefore its physical consequences are still unexplored.

  8. Reactor operation environmental information document

    SciTech Connect (OSTI)

    Wike, L.D.; Specht, W.L.; Mackey, H.E.; Paller, M.H.; Wilde, E.W.; Dicks, A.S.

    1989-12-01T23:59:59.000Z

    The Savannah River Site (SRS) is a large United States Department of Energy installation on the upper Atlantic Coastal Plain of South Carolina. The SRS contains diverse habitats, flora, and fauna. Habitats include upland terrestrial areas, varied wetlands including Carolina Bays, the Savannah River swamp system, and impoundment related and riparian wetlands, and the aquatic habitats of several stream systems, two large cooling reservoirs, and the Savannah River. These diverse habitats support a large variety of plants and animals including many commercially or recreational valuable species and several rare, threatened or endangered species. This volume describes the major habitats and their biota found on the SRS, and discuss the impacts of continued operation of the K, L, and P production reactors.

  9. Chicago Operations Office: Technology summary

    SciTech Connect (OSTI)

    Not Available

    1994-12-01T23:59:59.000Z

    This document has been prepared by the Department of Energy`s (DOE) Environmental Management (EM) Office of Technology Development (OTD) to highlight its research, development, demonstration, testing, and evaluation (RDDT and E) activities funded through the Chicago Operations Office. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US Industry`s competitiveness in global environmental markets. The information has been assembled from recently produced OTD documents which highlight technology development activities within each of the OTD program elements. OTD technologies addresses three specific problem areas: (1) groundwater and soils cleanup; (2) waste retrieval and processing; and (3) pollution prevention. These problems are not unique to DOE, but are associated with other Federal agency and industry sites as well. Thus, technical solutions developed within OTD programs will benefit DOE, and should have direct applications in outside markets.

  10. Electro Catalytic Oxidation (ECO) Operation

    SciTech Connect (OSTI)

    Morgan Jones

    2011-03-31T23:59:59.000Z

    The power industry in the United States is faced with meeting many new regulations to reduce a number of air pollutants including sulfur dioxide, nitrogen oxides, fine particulate matter, and mercury. With over 1,000 power plants in the US, this is a daunting task. In some cases, traditional pollution control technologies such as wet scrubbers and SCRs are not feasible. Powerspan's Electro-Catalytic Oxidation, or ECO{reg_sign} process combines four pollution control devices into a single integrated system that can be installed after a power plant's particulate control device. Besides achieving major reductions in emissions of sulfur dioxide (SO{sub 2}), nitrogen oxides (NOx), fine particulate matter (PM2.5) and mercury (Hg), ECO produces a highly marketable fertilizer, which can help offset the operating costs of the process system. Powerspan has been operating a 50-MW ECO commercial demonstration unit (CDU) at FirstEnergy Corp.'s R.E. Burger Plant near Shadyside, Ohio, since February 2004. In addition to the CDU, a test loop has been constructed beside the CDU to demonstrate higher NOx removal rates and test various scrubber packing types and wet ESP configurations. Furthermore, Powerspan has developed the ECO{reg_sign}{sub 2} technology, a regenerative process that uses a proprietary solvent to capture CO{sub 2} from flue gas. The CO{sub 2} capture takes place after the capture of NOx, SO{sub 2}, mercury, and fine particulate matter. Once the CO{sub 2} is captured, the proprietary solution is regenerated to release CO{sub 2} in a form that is ready for geological storage or beneficial use. Pilot scale testing of ECO{sub 2} began in early 2009 at FirstEnergy's Burger Plant. The ECO{sub 2} pilot unit is designed to process a 1-MW flue gas stream and produce 20 tons of CO{sub 2} per day, achieving a 90% CO{sub 2} capture rate. The ECO{sub 2} pilot program provided the opportunity to confirm process design and cost estimates, and prepare for large scale capture and sequestration projects. The objectives of this project were to prove at a commercial scale that ECO is capable of extended operations over a range of conditions, that it meets the reliability requirements of a typical utility, and that the fertilizer co-product can be consistently generated, providing ECO with an economic advantage over conventional technologies currently available. Further objectives of the project were to show that the ECO system provides flue gas that meets the inlet standards necessary for ECO{sub 2} to operate, and that the outlet CO{sub 2} and other constituents produced by the ECO{sub 2} pilot can meet Kinder-Morgan pipeline standards for purposes of sequestration. All project objectives are consistent with DOE's Pollution Control Innovations for Power Plants program goals.

  11. Robust scheduling in forest operations planning

    E-Print Network [OSTI]

    Lim, Lui Cheng

    2008-01-01T23:59:59.000Z

    Forest operations planning is a complex decision process which considers multiple objectives on the strategic, tactical and operational horizons. Decisions such as where to harvest and in what order over different time ...

  12. FM 3-21.38 Pathfinder Operations

    E-Print Network [OSTI]

    US Army Corps of Engineers

    .........................................................................................2-6 Section III. CONDUCT OF OPERATIONSFM 3-21.38 Pathfinder Operations APRIL 2006 DISTRIBUTION RESTRICTION: Approved for public-21.38 Department of the Army Washington, DC, 25 April 2006 Pathfinder Operations Contents Page PREFACE

  13. Sandia National Laboratories: SWiFT Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations SWiFT Operations wind-turbines The DOESNL SWiFT facility has three research-scale variable-speed variable-pitch modified wind turbines with full power conversion and an...

  14. Operational experience with superconducting synchrotron magnets

    SciTech Connect (OSTI)

    Martin, P.S.

    1987-03-01T23:59:59.000Z

    The operational experience with the Fermilab Tevatron is presented, with emphasis on reliability and failure modes. Comprisons are made between the operating efficiencies for the superconducting machine and for he conventional Main Ring.

  15. Distributed scheduling for efficient HVAC precooling operations

    E-Print Network [OSTI]

    Yang, Su

    2014-01-01T23:59:59.000Z

    of supply and return fans for HVAC systems under di?erentOp- timal Scheduling of HVAC Pre-cooling Operations withScheduling for E?cient HVAC Pre-cooling Operations ? Yang

  16. Automatic Control of Freeboard and Turbine Operation

    E-Print Network [OSTI]

    Automatic Control of Freeboard and Turbine Operation ­ Wave Dragon, Nissum Bredning Project: Sea of Freeboard and Turbine Operation Wave Dragon, Nissum Bredning by Jens Peter Kofoed & Peter Frigaard, Aalborg.........................................................................................................................10 TURBINE PERFORMANCE DATA

  17. Store-operate-coherence-on-value

    DOE Patents [OSTI]

    Chen, Dong; Heidelberger, Philip; Kumar, Sameer; Ohmacht, Martin; Steinmacher-Burow, Burkhard

    2014-11-18T23:59:59.000Z

    A system, method and computer program product for performing various store-operate instructions in a parallel computing environment that includes a plurality of processors and at least one cache memory device. A queue in the system receives, from a processor, a store-operate instruction that specifies under which condition a cache coherence operation is to be invoked. A hardware unit in the system runs the received store-operate instruction. The hardware unit evaluates whether a result of the running the received store-operate instruction satisfies the condition. The hardware unit invokes a cache coherence operation on a cache memory address associated with the received store-operate instruction if the result satisfies the condition. Otherwise, the hardware unit does not invoke the cache coherence operation on the cache memory device.

  18. OFFICE OF RESOURCE PLANNING OPERATING BUDGET UNIT

    E-Print Network [OSTI]

    Leng, Chenlei

    OFFICE OF RESOURCE PLANNING Manager Sarah Teo OPERATING BUDGET UNIT Deputy Director (Operating, Strategic Initiatives & Consolidated Budgets) Tay Sok Kian Senior Director Ajith Prasad Senior Associate Initiatives & Research Budgets: (Planning & Budget Management) Revenue Policies & Planning: (Grants

  19. 15.761 Operations Management, Summer 2002

    E-Print Network [OSTI]

    Rosenfield, Donald

    2002-01-01T23:59:59.000Z

    This course will introduce concepts and techniques for design, planning and control of manufacturing and service operations. The course provides basic definitions of operations management terms, tools and techniques ...

  20. SPECTRAL THEORY FOR JACOBI OPERATORS A Dissertation

    E-Print Network [OSTI]

    Teschl, Gerald

    of a given semi-bounded back- ground Jacobi operator and the double commutation method which inserts eigen- values into arbitrary spectral gaps. Moreover, we prove unitary equivalence of the commuted operators

  1. Building Operator Certification: Improving Commercial Building Energy Efficiency Through Operator Training and Certification

    E-Print Network [OSTI]

    Putnam, C.; Mulak, A.

    2001-01-01T23:59:59.000Z

    Building Operator Certification (BOC) is a competency-based certification for building operators designed to improve the energy efficiency of commercial buildings. Operators earn certification by attending training sessions and completing project...

  2. Daily Scheduling of Nurses in Operating Suites

    E-Print Network [OSTI]

    2011-10-07T23:59:59.000Z

    Department of Industrial Engineering ... Quality Engineering and Clinical Operations Informatics ... As the types of services and treatments offered by.

  3. Office of Administrative Operations (GC-90)

    Broader source: Energy.gov [DOE]

    John D. (Dan) Bullington, Director of Administrative Operations 202-586-7364dan.bullington@hq.doe.gov

  4. Commuting higher rank ordinary differential operators

    E-Print Network [OSTI]

    Andrey E. Mironov

    2012-04-10T23:59:59.000Z

    In this paper we discuss some results related to commuting ordinary differential operators of rank greater than one.

  5. Track 6: Integrating Safety Into Security Operations

    Broader source: Energy.gov [DOE]

    ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 6: Integrating Safety Into Security Operations

  6. Measurement and self-adjoint operators

    E-Print Network [OSTI]

    Glenn Eric Johnson

    2014-09-05T23:59:59.000Z

    The approximations of classical mechanics resulting from quantum mechanics are richer than a correspondence of classical dynamical variables with self-adjoint Hilbert space operators. Assertion that classical dynamic variables correspond to self-adjoint Hilbert space operators is disputable and sets unnatural limits on quantum mechanics. Well known examples of classical dynamical variables not associated with self-adjoint Hilbert space operators are discussed as a motivation for the realizations of quantum field theory that lack Hermitian field operators but exhibit interaction.

  7. Optimization Online - Operations Risk Management by Planning ...

    E-Print Network [OSTI]

    Emmanuel Fragni re

    2007-08-01T23:59:59.000Z

    Aug 1, 2007 ... Operations Risk Management by Planning Optimally the Qualified Workforce Capacity. Emmanuel Fragni re(Emmanuel.Fragniere ***at*** ...

  8. Standard Operating Procedure (SOP) -Milling Machine

    E-Print Network [OSTI]

    Veiga, Pedro Manuel Barbosa

    Standard Operating Procedure (SOP) - Milling Machine · Keep all guards in place while operating the machine. · While operating the milling machine allow no one else to touch it. · Keep hands away from moving cutting tools. · Do not make measurements of the stock while the milling machine is powered. · Do

  9. TEXAS A&M UNIVERSITY EMERGENCY OPERATIONS

    E-Print Network [OSTI]

    TEXAS A&M UNIVERSITY EMERGENCY OPERATIONS PLAN July 31, 2013 #12;TEXAS A&M UNIVERSITY EMERGENCY OPERATIONS PLAN 7/31/2013 v.2.0 Page 1 PROMULGATION STATEMENT The Emergency Operations Plan (EOP) and contents within is a guide to how the University conducts all-hazards response. The EOP is written

  10. August 1993 INTEGRATED HATCHERY OPERATIONS TEAM

    E-Print Network [OSTI]

    August 1993 INTEGRATED HATCHERY OPERATIONS TEAM OPERATION PLANS FOR ANADROMOUS FISH PRODUCTION.S. Department of Energy, as part of BPA's program to protect, mitigate, and enhance fish and wildlife affected as follows: Shelldrake, Tom, U.S. Fish and Wildlife Service Hatcheries, Integrated Hatchery Operations Team

  11. LM741OperationalAmplifier November 1994

    E-Print Network [OSTI]

    Ida, Nathan

    TL H 9341 LM741OperationalAmplifier November 1994 LM741 Operational Amplifier General Description The LM741 series are general purpose operational amplifi- ers which feature improved performance over industry stan- dards like the LM709 They are direct plug-in replacements for the 709C LM201 MC1439 and 748

  12. Void Fraction Instrument operation and maintenance manual

    SciTech Connect (OSTI)

    Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

    1994-09-01T23:59:59.000Z

    This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

  13. Automated Operating Procedures for Transfer Limits

    E-Print Network [OSTI]

    Automated Operating Procedures for Transfer Limits Final Project Report Power Systems Engineering · Illinois · Iowa State · Texas A&M · Washington State · Wisconsin Automated Operating Procedures operating procedures to establish system constraints, particularly in regards to transfer limits across

  14. CLOUD COMPUTING INFRASTRUCTURE AND OPERATIONS PROGRAM

    E-Print Network [OSTI]

    Schaefer, Marcus

    CLOUD COMPUTING INFRASTRUCTURE AND OPERATIONS PROGRAM A six-week in-depth program in the architectures, infrastructure, and operations of Cloud Computing DePaul University's Cloud Computing Infrastructure and Operations Program provides specialized knowledge in Cloud infrastructure with emphasis

  15. The Joint Essential Numerical Range of operators

    E-Print Network [OSTI]

    Li, Chi-Kwong

    The Joint Essential Numerical Range of operators: Convexity and Related Results Chi-Kwong Li Classification 47A12, 47A13, 47A55. Keywords Joint essential numerical range, self-adjoint operator, Hilbert the joint behavior of several operators A1, . . . , Am. One may see [1, 5, 12, 14, 15, 16, 19, 23, 28, 31

  16. LIMITING ABSORPTION PRINCIPLE FOR SINGULARLY PERTURBED OPERATORS

    E-Print Network [OSTI]

    LIMITING ABSORPTION PRINCIPLE FOR SINGULARLY PERTURBED OPERATORS WALTER RENGER Abstract. Given an operator H 1 for which a limiting absorption principle holds, we study operators H 2 which are produced that (except for possibly a discrete set of eigenvalues) a limiting absorption principle holds for H 2 . We

  17. LABORATORY ANIMAL FACILITIES STANDARD OPERATING PROCEDURE

    E-Print Network [OSTI]

    Krovi, Venkat

    4.A.22 LABORATORY ANIMAL FACILITIES STANDARD OPERATING PROCEDURE FOR OPERATION/MAINTENANCE. 2.0 Scope This procedure applies to all personnel needing to operate this equipment. 3.0 Procedure 3 OF QUANTIFLEX ANESTHESIA MACHINE/ SURGIVET SAV2500 VENTILATOR UNIT 1.0 Purpose This procedure outlines how

  18. STANDARD OPERATING PROCEDURES Annual Site Maintenance

    E-Print Network [OSTI]

    Fischer, Emily V.

    IMPROVE STANDARD OPERATING PROCEDURES SOP 226 Annual Site Maintenance Date Last Modified Modified This standard operating procedure (SOP) describes the procedures for annual maintenance of equipment Sampler Operation Manual #12;SOP 226: Annual Site Maintenance 3 1.0 PURPOSE AND APPLICABILITY

  19. Office of Employee Development Operational Efficiency Project

    E-Print Network [OSTI]

    Huang, Jianyu

    Office of Employee Development Operational Efficiency Project Survey Summary from Supervisory Staff the University titled "Operational Efficiency Project." Its mandate was to gather information, evaluate current operations, review benchmarks and best practices, and develop organizational and/or cost saving alternatives

  20. Liquid and gaseous waste operations section. Annual operating report CY 1997

    SciTech Connect (OSTI)

    Maddox, J.J.; Scott, C.B.

    1998-03-01T23:59:59.000Z

    This document presents information on the liquid and gaseous wastes operations section for calendar year 1997. Operating activities, upgrade activities, and maintenance activities are described.

  1. Training new operators - the first six months

    SciTech Connect (OSTI)

    Worthel, B.; /Fermilab

    2010-04-01T23:59:59.000Z

    The Fermilab Operations Department takes about two years to train a new Operator. The Operator's introductory (Concepts) On-the-Job-Training (OJT) gives him or her an overview of the laboratory, teaches the basic facts about all the accelerators, and it also teaches the new operator the training process used for all the rest of their OJT training. The Concepts OJT takes about four to six months for most people to complete. This paper will explain how this first six months of training sets the new employee on their path to becoming a fully trained Operator.

  2. Multilinear operators for higher-order decompositions.

    SciTech Connect (OSTI)

    Kolda, Tamara Gibson

    2006-04-01T23:59:59.000Z

    We propose two new multilinear operators for expressing the matrix compositions that are needed in the Tucker and PARAFAC (CANDECOMP) decompositions. The first operator, which we call the Tucker operator, is shorthand for performing an n-mode matrix multiplication for every mode of a given tensor and can be employed to concisely express the Tucker decomposition. The second operator, which we call the Kruskal operator, is shorthand for the sum of the outer-products of the columns of N matrices and allows a divorce from a matricized representation and a very concise expression of the PARAFAC decomposition. We explore the properties of the Tucker and Kruskal operators independently of the related decompositions. Additionally, we provide a review of the matrix and tensor operations that are frequently used in the context of tensor decompositions.

  3. Environmental Response Team Standard Operating Procedures for Contaminated Water Diving Operations

    E-Print Network [OSTI]

    Sura, Philip

    Dilution of Contaminants ·· Small Closed Body of WaterSmall Closed Body of Water ·· Pond or Flooded QuarryPond or FloodedEnvironmental Response Team Standard Operating Procedures for Contaminated Water Diving Operations for Contaminated Water Diving OperationsProcedures for Contaminated Water Diving Operations AAUS March 2010 Meeting

  4. CIS 380 Operating Systems Course Number & Title (A.1) CIS 380 Operating Systems

    E-Print Network [OSTI]

    Plotkin, Joshua B.

    CIS 380 Operating Systems Course Number & Title (A.1) CIS 380 Operating Systems Credit Units (A.2 Operating Systems (3/e). Prentice Hall, Supplementary text: W. Richard Stevens and Stephen A. Rago. Advanced) This course is an introduction to the theory and practice behind modern computer operating systems. Topics

  5. Method of operating a thermoelectric generator

    DOE Patents [OSTI]

    Reynolds, Michael G; Cowgill, Joshua D

    2013-11-05T23:59:59.000Z

    A method for operating a thermoelectric generator supplying a variable-load component includes commanding the variable-load component to operate at a first output and determining a first load current and a first load voltage to the variable-load component while operating at the commanded first output. The method also includes commanding the variable-load component to operate at a second output and determining a second load current and a second load voltage to the variable-load component while operating at the commanded second output. The method includes calculating a maximum power output of the thermoelectric generator from the determined first load current and voltage and the determined second load current and voltage, and commanding the variable-load component to operate at a third output. The commanded third output is configured to draw the calculated maximum power output from the thermoelectric generator.

  6. Digital computer operation of a nuclear reactor

    DOE Patents [OSTI]

    Colley, Robert W. (Richland, WA)

    1984-01-01T23:59:59.000Z

    A method is described for the safe operation of a complex system such as a nuclear reactor using a digital computer. The computer is supplied with a data base containing a list of the safe state of the reactor and a list of operating instructions for achieving a safe state when the actual state of the reactor does not correspond to a listed safe state, the computer selects operating instructions to return the reactor to a safe state.

  7. Digital computer operation of a nuclear reactor

    DOE Patents [OSTI]

    Colley, R.W.

    1982-06-29T23:59:59.000Z

    A method is described for the safe operation of a complex system such as a nuclear reactor using a digital computer. The computer is supplied with a data base containing a list of the safe state of the reactor and a list of operating instructions for achieving a safe state when the actual state of the reactor does not correspond to a listed safe state, the computer selects operating instructions to return the reactor to a safe state.

  8. WRAP TRUPACT loading systems operational test report

    SciTech Connect (OSTI)

    DOSRAMOS, E.V.

    1999-09-01T23:59:59.000Z

    This Operational Test Report documents the operational testing of the TRUPACT process equipment HNF-3918, Revision 0, TRUPACT Operational Test Procedure. The test accomplished the following: Procedure validation; Facility equipment interface; Facility personnel support; and Subcontractor personnel support interface. Field changes are documented as test exceptions with resolutions. All resolutions are completed or a formal method is identified to track the resolution through to completion.

  9. A Thomson-type mass and energy spectrometer for characterizing ion energy distributions in a coaxial plasma gun operating in a gas-puff mode

    SciTech Connect (OSTI)

    Rieker, G. B.; Poehlmann, F. R.; Cappelli, M. A. [High Temperature Gasdynamics Laboratory, Stanford University, Stanford, California 94305 (United States)] [High Temperature Gasdynamics Laboratory, Stanford University, Stanford, California 94305 (United States)

    2013-07-15T23:59:59.000Z

    Measurements of ion energy distribution are performed in the accelerated plasma of a coaxial electromagnetic plasma gun operating in a gas-puff mode at relatively low discharge energy (900 J) and discharge potential (4 kV). The measurements are made using a Thomson-type mass and energy spectrometer with a gated microchannel plate and phosphor screen as the ion sensor. The parabolic ion trajectories are captured from the sensor screen with an intensified charge-coupled detector camera. The spectrometer was designed and calibrated using the Geant4 toolkit, accounting for the effects on the ion trajectories of spatial non-uniformities in the spectrometer magnetic and electric fields. Results for hydrogen gas puffs indicate the existence of a class of accelerated protons with energies well above the coaxial discharge potential (up to 24 keV). The Thomson analyzer confirms the presence of impurities of copper and iron, also of relatively high energies, which are likely erosion or sputter products from plasma-electrode interactions.

  10. Office of Enterprise Assessments Operational Awareness Record...

    Energy Savers [EERE]

    HA sessions of select LMP HA events to clarify the hazards of the glass-water reaction, maintenance operations, and potential criticality. The HAT discussed updated analysis to...

  11. Multicylinder Diesel Engine Design for HCCI Operation

    Broader source: Energy.gov (indexed) [DOE]

    7 DEER Detroit August 12-16 Multicylinder Diesel Engine Design for HCCI operation William de Ojeda Phil Zoldak, Ral Espinoza, Raj Kumar, Chunyi Xia, Dan Cornelius International...

  12. Investigation on Operating Characteristics of RGB LEDs.

    E-Print Network [OSTI]

    Liao, Chi-nan

    2007-01-01T23:59:59.000Z

    ??This thesis seeks to gain a better understanding on operating characteristics of the three primary color light emitting diode (LED). By applying direct, pulse and… (more)

  13. ITEP Course: Greening Tribal Operations and Facilities

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Institute for Tribal Environmental Professionals will be offering a new course, Greening Tribal Operations and Facilities in San Diego, California, December 9 -11, 2014, for employees of...

  14. Multidisciplinary University Research Initiative: High Operating...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    University Research Initiative (MURI) to develop high-operating temperature heat-transfer fluids for concentrating solar power (CSP) applications. The following...

  15. Occurrence Reporting and Processing of Operations Information

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-25T23:59:59.000Z

    This Manual provides detailed requirements to supplement DOE O 232.1, Occurrence Reporting and Processing of Operations Information. Chg 1 dated 8-12-96.

  16. ICDF Complex Operations Waste Management Plan

    SciTech Connect (OSTI)

    W.M. Heileson

    2006-12-01T23:59:59.000Z

    This Waste Management Plan functions as a management and planning tool for managing waste streams generated as a result of operations at the Idaho CERCLA Disposal Facility (ICDF) Complex. The waste management activities described in this plan support the selected remedy presented in the Waste Area Group 3, Operable Unit 3-13 Final Record of Decision for the operation of the Idaho CERCLA Disposal Facility Complex. This plan identifies the types of waste that are anticipated during operations at the Idaho CERCLA Disposal Facility Complex. In addition, this plan presents management strategies and disposition for these anticipated waste streams.

  17. Jefferson Lab accelerator upgrade completed: Initial operations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DOE to begin initial operations of the Continuous Electron Beam Accelerator Facility (CEBAF) as part of its ongoing 338 million upgrade. With the approval of Critical...

  18. Participatory Carbon Monitoring: Operational Guidance for National...

    Open Energy Info (EERE)

    Participatory Carbon Monitoring: Operational Guidance for National REDD+ Carbon Accounting Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Participatory Carbon...

  19. APPA Engineering and Operations Technical Conference

    Office of Energy Efficiency and Renewable Energy (EERE)

    The 2014 APPA Engineering and Operations Technical Conference is designed for public power professionals charged with designing, developing, and maintaining the nation's electric system.

  20. Process Design and Operation for Energy Efficiency

    E-Print Network [OSTI]

    Rossiter, A. P.; Nath, R.; Yell, M. D.

    by the following example from a large petrochemical plant that recently installed an optimization system: It was plant practice to maintain a large steam reserve in the operation...

  1. Distributed Generation Operational Reliability and Availability...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reliability and Availability Database, Final Report, January 2004 Distributed Generation Operational Reliability and Availability Database, Final Report, January 2004 This final...

  2. STANDARD OPERATING PROCEDURE ACIDS CONTAINING PHOSPHOROUS

    E-Print Network [OSTI]

    Pawlowski, Wojtek

    12.1 STANDARD OPERATING PROCEDURE for ACIDS CONTAINING PHOSPHOROUS Location(s): ___________________________________________________ Chemical(s): Hypophosphorous acid, methylphosphonic acid, phosphonic acid, phosphoric acid, phosphorous

  3. Optimizing Asset Utilization and Operating Efficiency Efficiently...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2008 Optimizing Asset Utilization and Operating Efficiency Efficiently, June 2008 Smart Grid Implementation Workshop Breakout Group Report, a discussion of metrics for smart grid...

  4. Enterprise Assessments Operational Awareness Record, Waste Treatment...

    Office of Environmental Management (EM)

    tables. The review was conducted June 2-19, 2014. Enterprise Assessments Operational Awareness Record, Waste Treatment and Immobilization Plant - December 2014 More Documents &...

  5. Wastewater Construction and Operation Permits (Iowa)

    Broader source: Energy.gov [DOE]

    These regulations describe permit requirements for the construction and operation of facilities treating wastewater, and provide separation distances from other water sources.

  6. Integrating Solar PV in Utility System Operations

    E-Print Network [OSTI]

    Mills, A.

    2014-01-01T23:59:59.000Z

    Laboratory National Renewable Energy Laboratory Universityof Energy Efficiency and Renewable Energy (Solar EnergySystem Operations Table 27. Renewable Curtailment in the BR

  7. Office of Enterprise Assessments Operational Awareness Record...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Review of the Waste Isolation Pilot Plant Exercise Horizon-14 - December 2014. The WIPP operating contractor, Nuclear Waste Partnership LLC (NWP), conducted the Horizon-14...

  8. Automating Datacenter Operations Using Machine Learning

    E-Print Network [OSTI]

    Bodik, Peter

    2010-01-01T23:59:59.000Z

    4 Fingerprinting the Datacenter: Automated Classification of6.2.2 Trusting SML in Datacenter Operations . . . . . .in the datacenter under study. . . . . . . . . . . . . ROC

  9. Emergency Operations Training Academy | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    Introduction Monitoring Division Mgr Training, Adv NARAC Dispersion Modeling NARAC Web Operations Overview of Consequence Management Overview of the DOENNSA Emergency...

  10. 15.769 Operations Strategy, Fall 2005

    E-Print Network [OSTI]

    Rosenfield, Donald

    The class provides a unifying framework for analyzing strategic issues in manufacturing and service operations. Relationships between manufacturing and service companies and their suppliers, customers, and competitors are ...

  11. International reservoir operations agreement helps NW fish &...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    or 503-230-5131 International reservoir operations agreement helps Northwest fish and power Portland, Ore. - The Bonneville Power Administration and the British Columbia...

  12. DOE High Performance Computing Operational Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Forward Private Sector Partnerships MANTISSA Home R & D HPCOR DOE High Performance Computing Operational Review (HPCOR) All logos Enabling Data-Driven Scientific...

  13. Convolution type operators on locally compact groups

    E-Print Network [OSTI]

    Shtein--~erg, Convolution Type Operators on Locally Compact Groups [in Russian],. Manuscript Deposited in the All-Union Institute of Scientific and Technical ...

  14. Summary - Operational Issues at the Environmental Restoration...

    Office of Environmental Management (EM)

    radioactivity had been placed in the ERDF. In 2006, events occurred that affected the operation of the automatic leachate transfer pumps and a technician confessed to having not...

  15. Operational quantum theory without predefined time

    E-Print Network [OSTI]

    Ognyan Oreshkov; Nicolas J. Cerf

    2014-12-25T23:59:59.000Z

    The current operational formulation of quantum theory is based on the concept of operation with an input and an output system, which assumes a prior notion of time and is asymmetric under time reversal. But in certain contexts, such as those involving gravity, time is expected to be dynamical and not predefined. Here, we propose an operational formulation of quantum theory without any predefined notion of time. It is based on a generalization of the concept of operation motivated by an epistemic approach: an operation is a description of knowledge about the events in a given region, which can be updated conditionally on information obtained from that region. Each such region has a set of boundary systems, which by definition provide the sole means of information exchange between the events in the region and the events in other regions. Separate operations can be connected in networks through their boundary systems with no directionality assumed for the connections, which generalizes the standard circuit picture. The events associated with an operation are described by positive semidefinite operators on the Hilbert spaces of the boundary systems, while the connections between regions are described by entangled states that encode a nontrivial physical symmetry. A simple rule provides the joint probabilities for the events in a network of operations. We discuss how it may be possible to understand the emergence of a causal structure from properties of the operators on the boundaries of compact space-time regions. The framework allows for indefinite causal order, timelike loops, and other acausal structures. As part of this work, we obtain a generalization of Wigner's theorem, which is based on the preservation of probabilities of actual events and thus puts the concept of time reversal symmetry on operational grounds. It contains the possibility for a new class of symmetry transformations.

  16. Conduct Operations Assessment Plan - Developed By NNSA/Nevada...

    Broader source: Energy.gov (indexed) [DOE]

    August 2003 - Conduct of Operations (Programmatic Implementation) Utilize Conduct of Operations - 5480.19 Utilize BN PD-0021.001 - Formality of Operations Utilize LLNL, LANL...

  17. PIA - Savannah River Operations Office Executive Commitment Action...

    Energy Savers [EERE]

    Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations...

  18. PIA - WEB Unclassified Business Operations General Support System...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support System PIA - WEB Unclassified Business Operations General Support...

  19. Defining control strategies for microgrids islanded operation

    E-Print Network [OSTI]

    J. A. Peças Lopes; Senior Member; C. L. Moreira; A. G. Madureira

    2006-01-01T23:59:59.000Z

    Abstract—This paper describes and evaluates the feasibility of control strategies to be adopted for the operation of a microgrid when it becomes isolated. Normally, the microgrid operates in interconnected mode with the medium voltage network; however, scheduled or forced isolation can take place

  20. CMA Operating Manual: Canon Mask Aligner Introduction

    E-Print Network [OSTI]

    Yoo, S. J. Ben

    CMA Operating Manual: Canon Mask Aligner Introduction Use the Canon PLA-501F Mask Aligner (See Fig: Dan Haskell, 1125 Kemper Hall Corey Wolin, 1125 Kemper Hall Lab Manager Pre-operational Checklist Before you enter the cleanroom: 1. Have you arranged training from the superuser or lab manager

  1. University of Maryland Forklift Operator Evaluation

    E-Print Network [OSTI]

    Rubloff, Gary W.

    -314-9294. OPERATOR ACTIONS RATING COMMENTS Pre-use Inspection 1. Follow Operator's Daily Checklist GOOD. Uses Seat belt YES NO Picking Up The Load 1. Square up on the center of the load. GOOD FAIR POOR N/A 2. Stop with the fork tips about 1 foot from the load. GOOD FAIR POOR N

  2. Factorizations of Operator Matrices Lawrence A. Harris

    E-Print Network [OSTI]

    Harris, Larry

    Factorizations of Operator Matrices Lawrence A. Harris Mathematics Department University matrix as a product of an upper triangular operator matrix and an involutory, unitary or J- unitary L(H, K) and (A - WC)-1 exists; moreover, S = T-1 . Theorem 1 Put R = -(A - W0C) AZ0 + W0D 0 CZ0 + D

  3. ICD Complex Operations and Maintenance Plan

    SciTech Connect (OSTI)

    Gibson, P. L.

    2007-06-25T23:59:59.000Z

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  4. The XY Spin Chain Random Block Operators

    E-Print Network [OSTI]

    Jung, Paul

    The XY Spin Chain Random Block Operators Proof of Main Result Open Questions Localization for Random Block Operators Related to the XY Spin Chain Jacob W. Chapman Division of Science Southern Wesleyan University Central, SC Joint work with G¨unter Stolz UAB NSF-CBMS Conference on Quantum Spin

  5. Occurrence Reporting and Processing of Operations Information

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-25T23:59:59.000Z

    To establish and maintain a system for reporting operations information related to DOE-owned or -operated facilities and processing that information to identify the root causes of Unusual, Off -Normal, and Emergency Occurrences and provide for appropriate corrective action. Chg 1, 10-26-95. Canceled by DOE O 231.1B

  6. Occurrence Reporting and Processing of Operations Information

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-08-12T23:59:59.000Z

    To establish and maintain a system for reporting operations information related to DOE-owned or -operated facilities and processing that information to identify the root causes of Unusual, Off -Normal, and Emergency Occurrences and provide for appropriate corrective action. Chg 2, 8-12-96

  7. Safe Operating Procedure (Revised 8/09)

    E-Print Network [OSTI]

    Farritor, Shane

    laboratories, maintenance and custodial operations, or auxiliary operations such as Transportation or Printing an inspection. Regulatory authorities will be interested in management practices for chemical wastes, as well types. The following guidelines describe what you should do if NDEQ or EPA conducts an inspection

  8. Integrated Retail & Wholesale Power System Operation

    E-Print Network [OSTI]

    Tesfatsion, Leigh

    Integrated Retail & Wholesale Power System Operation with Smart-Grid Functionality PIs: Dionysios Retail/Wholesale Power System Operation with Smart-Grid Functionality Project PIs: Dionysios Aliprantis (open-source release): AMES Wholesale Power Market Testbed (ISU) + GridLAB-D distribution platform (DOE

  9. Virtualizing Operating Systems for Seamless Distributed Environments

    E-Print Network [OSTI]

    Dasgupta, Partha

    Virtualizing Operating Systems for Seamless Distributed Environments 1 Tom Boyd and Partha Dasgupta of the "Computing Communities" project, a joint effort between Arizona State University and New York University. Abstract Applications and operating systems can be augmented with extra functionality by injecting

  10. WATER DISTRIBUTION SYSTEM OPERATION: APPLICATION OF

    E-Print Network [OSTI]

    Mays, Larry W.

    CHAPTER 5 WATER DISTRIBUTION SYSTEM OPERATION: APPLICATION OF SIMULATED ANNEALING Fred E. Goldman Arizona State University, Tempe, Arizona 5.1 INTRODUCTION The operation of water distribution systems affects the water quality in these systems. EPA regulations require that water quality be maintained

  11. Cw rf operation of the FMIT RFQ

    SciTech Connect (OSTI)

    Fazio, M.V.; Brandeberry, F.E.

    1985-01-01T23:59:59.000Z

    The 80-MHz RFQ for the Fusion Materials Irradiation Test Facility prototype accelerator has been rf conditioned for cw operation to the design field level of 17.5 MV/m (1.68 x Kilpatrick limit). Experimental results and operating experience will be discussed.

  12. Efficiency Vermont's Enhanced Building Operations Programs

    E-Print Network [OSTI]

    Laflamme, S.

    2011-01-01T23:59:59.000Z

    assistance, economic analysis, and financial incentives to help Vermont households and businesses reduce their energy costs 4 Efficiency Vermont?s Commercial & Industrial Programs New Construction Program ? Prescriptive - Rebates ? Core Performance... ? Custom Market Opportunity Program ? Prescriptive - Rebates ? Custom Retrofit Program ? Custom* * includes improving building operations programs More Information at www.efficiencyvermont.com 5 Efficiency Vermont?s Operational Improvement...

  13. Operation of orifice meter chart integrators

    SciTech Connect (OSTI)

    Gray, C. [EMC Services Co., Inc., Arlington, TX (United States)

    1995-12-01T23:59:59.000Z

    When properly maintained and operated, the chart integrator can provide reliable chart integration for many years. The overall accuracy of the integration process win be determined by the proficiency of the operator as well as the upkeep and calibration of the chart integrator.

  14. Potential Operating Orbits for the SAFE-400

    SciTech Connect (OSTI)

    Houts, Mike; Kos, Larry; Poston, David [NASA MSFC, TD40, Marshall Space Flight Center, Alabama, 35812 (United States)

    2002-07-01T23:59:59.000Z

    Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp > 3000 s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially non-radioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into nonradioactive isotopes. Operational constraints required to ensure safety can thus be quantified. (authors)

  15. Building a Sustainable Future FACILITIES & OPERATIONS

    E-Print Network [OSTI]

    Building a Sustainable Future FACILITIES & OPERATIONS #12;A Laboratory on a Mission ...to meet: The Environmental Technology Building and National Security Building house more than 650 staff members. #12;Pacific capacity "The Facilities & Operations organization is dedicated to safely and sustainably building

  16. Conduct of Operations Requirements for DOE Facilities

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1990-07-09T23:59:59.000Z

    "To provide requirements and guidelines for Departmental Elements, including the National Nuclear Security Administration (NNSA), to use in developing directives, plans, and/or procedures relating to the conduct of operations at DOE facilities. The implementation of these requirements and guidelines should result in improved quality and uniformity of operations. Change 2, 10-23-2001. Canceled by DOE O 422.1.

  17. PHYSICAL PLANT OPERATING POLICY AND PROCEDURE

    E-Print Network [OSTI]

    Gelfond, Michael

    PHYSICAL PLANT OPERATING POLICY AND PROCEDURE PP/OP 04.05: Development of Standard Labor Charge and Procedure (PP/OP) is to establish procedures for the development of a standard labor charge rate used when-600) ­ Account used to fund all maintenance and operation expenses for Custodial Services #12;June 7, 2010 Page 2

  18. SAFETY MANAGEMENT MANUAL OSU SHIP OPERATIONS

    E-Print Network [OSTI]

    Kurapov, Alexander

    overboarding operations on the vessel. 7.16.2 Scope This procedure covers the design, installation, maintenance.16.1 Purpose The purpose of this procedure is to set forth standards to ensure safe overboarding equipment on RSAFETY MANAGEMENT MANUAL OSU SHIP OPERATIONS 7.16 OVERBOARDING EQUIPMENT Originator: Approved By

  19. Occurrence reporting and processing of operations information

    SciTech Connect (OSTI)

    NONE

    1997-07-21T23:59:59.000Z

    DOE O 232.1A, Occurrence Reporting and Processing of Operations Information, and 10 CFR 830.350, Occurrence Reporting and Processing of Operations Information (when it becomes effective), along with this manual, set forth occurrence reporting requirements for Department of Energy (DOE) Departmental Elements and contractors responsible for the management and operation of DOE-owned and -leased facilities. These requirements include categorization of occurrences related to safety, security, environment, health, or operations (``Reportable Occurrences``); DOE notification of these occurrences; and the development and submission of documented follow-up reports. This Manual provides detailed information for categorizing and reporting occurrences at DOE facilities. Information gathered by the Occurrence Reporting and processing System is used for analysis of the Department`s performance in environmental protection, safeguards and security, and safety and health of its workers and the public. This information is also used to develop lessons learned and document events that significantly impact DOE operations.

  20. Locally-smeared operator product expansions

    SciTech Connect (OSTI)

    Monahan, Christopher; Orginos, Kostantinos

    2014-12-01T23:59:59.000Z

    We propose a "locally-smeared Operator Product Expansion" (sOPE) to decompose non-local operators in terms of a basis of locally-smeared operators. The sOPE formally connects nonperturbative matrix elements of smeared degrees of freedom, determined numerically using the gradient flow, to non-local operators in the continuum. The nonperturbative matrix elements do not suffer from power-divergent mixing on the lattice, provided the smearing scale is kept fixed in the continuum limit. The presence of this smearing scale prevents a simple connection to the standard operator product expansion and therefore requires the construction of a two-scale formalism. We demonstrate the feasibility of our approach using the example of real scalar field theory.

  1. A length operator for canonical quantum gravity

    E-Print Network [OSTI]

    T. Thiemann

    1996-06-29T23:59:59.000Z

    We construct an operator that measures the length of a curve in four-dimensional Lorentzian vacuum quantum gravity. We work in a representation in which a $SU(2)$ connection is diagonal and it is therefore surprising that the operator obtained after regularization is densely defined, does not suffer from factor ordering singularities and does not require any renormalization. We show that the length operator admits self-adjoint extensions and compute part of its spectrum which like its companions, the volume and area operators already constructed in the literature, is purely discrete and roughly is quantized in units of the Planck length. The length operator contains full and direct information about all the components of the metric tensor which faciliates the construction of a new type of weave states which approximate a given classical 3-geometry.

  2. Operating Experience and Teardown Analysis for Engines Operated on Biodiesel Blends (B20)

    SciTech Connect (OSTI)

    Fraer, R.; Dinh, H.; Proc, K.; McCormick, R. L.; Chandler, K.; Buchholz, B.

    2005-11-01T23:59:59.000Z

    In this study, eight engines and fuel systems were removed from trucks operating on B20 or diesel. Results indicate little difference in operational and maintenance costs between the B20- and diesel.

  3. CASE STUDY 95-04: Operator Certification: A Case Study in Operator Self-Inspection

    E-Print Network [OSTI]

    Cowap, Stacey

    1996-02-22T23:59:59.000Z

    Operator certification is the process where production workers are trained, authorized, and given the necessary resources to inspect their own work. This case study evaluated operator certification systems in the manufacturing ...

  4. Operating Experience Level 3, Importance of Conduct of Operations and Training for Effective Criticality Safety Programs

    Broader source: Energy.gov [DOE]

    OE-3 2012-07: Importance of Conduct of Operations and Training for Effective Criticality Safety Programs

  5. 1Centre for Autonomous Marine Operations and Systems -AMOSwww.ntnu.edu/amos Autonomous Marine Operations

    E-Print Network [OSTI]

    Nørvåg, Kjetil

    06.06.2013 1 1Centre for Autonomous Marine Operations and Systems - AMOSwww.ntnu.edu/amos Centre for Autonomous Marine Operations and Systems AMOS 2013-2022 Cost: NOK 566 million AMOS Funding: NOK 240 million Research Council 2Centre for Autonomous Marine Operations and Systems - AMOSwww.ntnu.edu/amos Greener

  6. T. Pun et al The Potato Operation 1 The Potato Operation

    E-Print Network [OSTI]

    Genève, Université de

    T. Pun et al The Potato Operation 1 The Potato Operation: Computer vision for agricultural robotics, Switzerland ABSTRACT Each year at harvest time millions of seed potatoes are checked for the presence of viruses, by means of an Elisa test. The Potato Operation aims at automatizing the potato manipulation

  7. Advanced energy design and operation technologies

    SciTech Connect (OSTI)

    Brambley, M.R.; Crawley, D.B.

    1988-09-01T23:59:59.000Z

    Current practice in design of commercial buildings does not adequately consider the relationships between design decisions and energy performance. Estimates indicate that if energy criteria were integral to the design process, more than 15% of the energy used in new buildings could be conserved. This could be done using readily available energy-efficient design knowledge, without any increase in first costs. Furthermore, building design necessarily involves assumptions concerning use and operation of the building once it is built. Currently, operations practices intended by the designer are not adequately transferred during commissioning to building operators for use as guides during operation. Advanced technologies for overcoming these problems are described in this paper. The advanced energy design and operations technologies will consist of an intelligent automated design advisor that utilizes artificial intelligence and other advanced computer technologies to provide assistance to and encourage interaction among all participants in the design process. Assistance will be provided at all points in the building design process, especially in the early phases of design (e.g., during building programming) where decisions can have particularly significant impacts on energy consumption. The technology used for the design advisor will facilitate transfer of critical operation guidance to building operators and, coupled with monitoring technology, provide feedback on performance to the design process. 4 refs., 1 fig.

  8. On conformal higher spin wave operators

    E-Print Network [OSTI]

    Teake Nutma; Massimo Taronna

    2014-07-08T23:59:59.000Z

    We analyze free conformal higher spin actions and the corresponding wave operators in arbitrary even dimensions and backgrounds. We show that the wave operators do not factorize in general, and identify the Weyl tensor and its derivatives as the obstruction to factorization. We give a manifestly factorized form for them on (A)dS backgrounds for arbitrary spin and on Einstein backgrounds for spin 2. We are also able to fix the conformal wave operator in d=4 for s=3 up to linear order in the Riemann tensor on generic Bach-flat backgrounds.

  9. Operation of staged membrane oxidation reactor systems

    SciTech Connect (OSTI)

    Repasky, John Michael

    2012-10-16T23:59:59.000Z

    A method of operating a multi-stage ion transport membrane oxidation system. The method comprises providing a multi-stage ion transport membrane oxidation system with at least a first membrane oxidation stage and a second membrane oxidation stage, operating the ion transport membrane oxidation system at operating conditions including a characteristic temperature of the first membrane oxidation stage and a characteristic temperature of the second membrane oxidation stage; and controlling the production capacity and/or the product quality by changing the characteristic temperature of the first membrane oxidation stage and/or changing the characteristic temperature of the second membrane oxidation stage.

  10. Systematic Comparison of Operating Reserve Methodologies: Preprint

    SciTech Connect (OSTI)

    Ibanez, E.; Krad, I.; Ela, E.

    2014-04-01T23:59:59.000Z

    Operating reserve requirements are a key component of modern power systems, and they contribute to maintaining reliable operations with minimum economic impact. No universal method exists for determining reserve requirements, thus there is a need for a thorough study and performance comparison of the different existing methodologies. Increasing penetrations of variable generation (VG) on electric power systems are posed to increase system uncertainty and variability, thus the need for additional reserve also increases. This paper presents background information on operating reserve and its relationship to VG. A consistent comparison of three methodologies to calculate regulating and flexibility reserve in systems with VG is performed.

  11. Schrödinger operators on armchair nanotubes. II

    E-Print Network [OSTI]

    Andrey Badanin; Jochen Brüning; Evgeny Korotyaev

    2007-07-26T23:59:59.000Z

    We consider the Schr\\"odinger operator with a periodic potential on quasi-1D models of armchair single-wall nanotubes. The spectrum of this operator consists of an absolutely continuous part (intervals separated by gaps) plus an infinite number of eigenvalues with infinite multiplicity. We describe the absolutely continuous spectrum of the Schr\\"odinger operator: 1) the multiplicity, 2) endpoints of the gaps, they are given by periodic or antiperiodic eigenvalues or resonances (branch points of the Lyapunov function), 3) resonance gaps, where the Lyapunov function is non-real. We determine the asymptotics of the gaps at high energy.

  12. Hazardous waste operational plan for site 300

    SciTech Connect (OSTI)

    Roberts, R.S.

    1982-02-12T23:59:59.000Z

    This plan outlines the procedures and operations used at LLNL's Site 300 for the management of the hazardous waste generated. This waste consists primarily of depleted uranium (a by-product of U-235 enrichment), beryllium, small quantities of analytical chemicals, industrial type waste such as solvents, cleaning acids, photographic chemicals, etc., and explosives. This plan details the operations generating this waste, the proper handling of this material and the procedures used to treat or dispose of the hazardous waste. A considerable amount of information found in this plan was extracted from the Site 300 Safety and Operational Manual written by Site 300 Facility personnel and the Hazards Control Department.

  13. Operations & Maintenance Best Practices Guide: Release 3.0

    Broader source: Energy.gov [DOE]

    Guide covers version 3.0 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  14. 500-kV Central Ferry Substation in Garfield County,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNGExperience hands-onASTROPHYSICS H.CarbonMarchTHE ADVANCED PHOTON

  15. Alvey-Fairview No.1, 230 kV Rebuild

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAbout theOFFICE OFFuelsPropane TankWashingtonAlternativeSolar Alumni

  16. Market characteristics of future oil tanker operations

    E-Print Network [OSTI]

    Willemann, Simmy Dhawan

    2014-01-01T23:59:59.000Z

    This work analyzes the market characteristics of future oil tanker operations with a particular emphasis on those aspects which will have a potential impact on the design of future vessels. The market analysis model used ...

  17. Modeling Operational Constraints imposed by Renewable Generation

    E-Print Network [OSTI]

    Daniels, Thomas E.

    4 #12;Operational effects into NETPLAN G LX L T R 5 #12;Effect of Wind on Load Following 10 min, that include: Regulation, Intra-hour and inter-hour load following, Contingency reserves, Generation cycling

  18. Facilities Operations, Planning, and Engineering Services

    E-Print Network [OSTI]

    McLaughlin, Richard M.

    Facilities Operations, Planning, and Design Engineering Services Energy Management & Water and In- house Engineering Mechanical Electrical Engineering Data Analysis Construction Services In Conservation Capital Project-Bldg Systems Review Commissioning BSL3/DLAM Engineer Building Systems Engineering

  19. An Effective Implementation of Operational Inventory Management

    E-Print Network [OSTI]

    Sellamuthu, Sivakumar

    2010-01-16T23:59:59.000Z

    operations related to inventory management projects and during that process adapt and/or extend theoretical inventory models according to real-world business complexity and data integrity problems. A holistic approach to automation was taken to satisfy both...

  20. Safe Operating Procedure (Revised 11/11)

    E-Print Network [OSTI]

    Farritor, Shane

    Generators Definition and Visual Determination of Opacity With regards to stack emissions, opacitySafe Operating Procedure (Revised 11/11) OPACITY OF EMISSIONS FROM COMBUSTION SOURCES (opacity) from combustion sources. Opacity monitoring & measurements are taken in accordance

  1. Control System Commissioning for Enhanced Building Operations

    E-Print Network [OSTI]

    Salsbury, T. I.; Singhal, A.

    2003-01-01T23:59:59.000Z

    This paper highlights the import role control systems play in the operation of modern buildings and describes ways to improve the final stage of commissioning. We also describe practical issues associated with modern IT-oriented control systems...

  2. An Operating Environment for the Jellybean Machine

    E-Print Network [OSTI]

    Totty, Brian K.

    1988-05-01T23:59:59.000Z

    The Jellybean Machine is a scalable MIMD concurrent processor consisting of special purpose RISC processors loosely coupled into a low latency network. I have developed an operating system to provide the supportive ...

  3. Saudi Aramco Gas Operations Energy Efficiency Program

    E-Print Network [OSTI]

    Al-Dossary, F. S.

    2012-01-01T23:59:59.000Z

    Saudi Aramco Gas Operations (GO) created energy efficiency strategies for its 5-year business plan (2011-2015), supported by a unique energy efficiency program, to reduce GO energy intensity by 26% by 2015. The program generated an energy savings...

  4. Nuclear Power - Operation, Safety and Environment

    E-Print Network [OSTI]

    as operation, safety, environment and radiation effects. The book is not offering a comprehensive coverage of the material in each area. Instead, selected themes are highlighted by authors of individual chapters representing contemporary interests worldwide...

  5. Asbestos : operating system security for mobile devices

    E-Print Network [OSTI]

    Stevenson, Martijn

    2006-01-01T23:59:59.000Z

    This thesis presents the design and implementation of a port of the Asbestos operating system to the ARM processor. The port to the ARM allows Asbestos to run on mobile devices such as cell phones and personal digital ...

  6. DOE-BATTELLE PRIME CONTRACT MANAGEMENT & OPERATIONS

    E-Print Network [OSTI]

    DOE-BATTELLE PRIME CONTRACT FOR THE MANAGEMENT & OPERATIONS OF PACIFIC NORTHWEST NATIONAL Introduction C ­ 2 RESERVED C ­ 3 Performance Expectations, Objectives, and Measures C ­ 3.1 Core Expectations

  7. Operating Plan 573.1-2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    573.1-2 Title: U.S. POSTAL MAIL, SHIPPING AND RECEIVING SECURITY Owner: Cindy Mullens, ESS&H Division, Office of Institutional Operations Approving Official: Thomas Wilson, Jr.,...

  8. A Computuerized Operator Support System Prototype

    SciTech Connect (OSTI)

    Ken Thomas; Ronald Boring; Roger Lew; Tom Ulrich; Richard Villim

    2013-08-01T23:59:59.000Z

    A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment.

  9. A Computuerized Operator Support System Prototype

    SciTech Connect (OSTI)

    Ken Thomas; Ronald Boring; Roger Lew; Tom Ulrich; Richard Villim

    2013-11-01T23:59:59.000Z

    A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment.

  10. Optimal operating strategy for a storage facility

    E-Print Network [OSTI]

    Zhai, Ning

    2008-01-01T23:59:59.000Z

    In the thesis, I derive the optimal operating strategy to maximize the value of a storage facility by exploiting the properties in the underlying natural gas spot price. To achieve the objective, I investigate the optimal ...

  11. PHYSICAL PLANT OPERATING POLICY AND PROCEDURE

    E-Print Network [OSTI]

    Gelfond, Michael

    or the parking lots of the Museum or ITC. f. Chiller Decks: Water from evaporator and condenser maintenance can: cleanup operations on the West Tower Driveway and the back doors of the plants adjacent to the chiller

  12. Expanding Robust HCCI Operation (Delphi CRADA)

    Broader source: Energy.gov (indexed) [DOE]

    Expanding Robust HCCI Operation A CRADA project with Delphi Automotive Systems Project ID: ACE053 2011 U.S. DOE Hydrogen and Vehicle Technologies Program Annual Merit Review and...

  13. Operations and Maintenance for Major Equipment Types

    Broader source: Energy.gov [DOE]

    Equipment lies at the heart of all operations and maintenance (O&M) activities. This equipment varies greatly across the Federal sector in age, size, type, model, condition, etc.

  14. Midwest Independent System Operator (Multiple States)

    Broader source: Energy.gov [DOE]

    Midwest Independent Transmission System Operator (MISO) is a Regional Transmission Organization, which administers wholesale electricity markets in all or parts of 11 U.S. states and the Canadian...

  15. Hydrate Control for Gas Storage Operations

    SciTech Connect (OSTI)

    Jeffrey Savidge

    2008-10-31T23:59:59.000Z

    The overall objective of this project was to identify low cost hydrate control options to help mitigate and solve hydrate problems that occur in moderate and high pressure natural gas storage field operations. The study includes data on a number of flow configurations, fluids and control options that are common in natural gas storage field flow lines. The final phase of this work brings together data and experience from the hydrate flow test facility and multiple field and operator sources. It includes a compilation of basic information on operating conditions as well as candidate field separation options. Lastly the work is integrated with the work with the initial work to provide a comprehensive view of gas storage field hydrate control for field operations and storage field personnel.

  16. Jrgen Bauck Jensen Optimal Operation of Refrigera-

    E-Print Network [OSTI]

    Skogestad, Sigurd

    and compared with the Tmin-method. Considering the large amount of work that goes into the design of LNG LNG process is used as an example for optimal design and optimal operation of LNG processes

  17. Inventory pre-positioning for humanitarian operations

    E-Print Network [OSTI]

    Akkihal, Anup Roop

    2006-01-01T23:59:59.000Z

    This research examines the impact of inventory pre-positioning on humanitarian operations. The study identifies optimal locations for warehousing non-consumable inventories required for initial deployment of aid. These ...

  18. VEHICLE OPERATING PROCEDURES DEPARTMENT OF BIOLOGICAL SCIENCE

    E-Print Network [OSTI]

    Ronquist, Fredrik

    VEHICLE OPERATING PROCEDURES DEPARTMENT OF BIOLOGICAL SCIENCE GENERAL INFORMATION Vehicles resposniblity and disciplinary action. Vehicles may be used by faculty or staff from other departments complete the vehicle usage agreement form certifying that they have a valid driver's license

  19. Safe Tractor Operation: Driving on Highways

    E-Print Network [OSTI]

    Smith, David

    2004-09-16T23:59:59.000Z

    About 50 tractor drivers are killed each year in collisions with other vehicles on public roads. Many of these accidents could be prevented. This publication describes the legal requirements for operating a tractor on public roads, safe driving...

  20. Safe Operating Procedure (Revised 5/08)

    E-Print Network [OSTI]

    Farritor, Shane

    , landscape, and maintenance operations) with kits. · Where kits are provided, a person should be designated, building maintenance reporter, or another individual. · Kits are a supplement to and not a replacement

  1. Naturalistic Decision Making for Power System Operators

    SciTech Connect (OSTI)

    Greitzer, Frank L.; Podmore, Robin; Robinson, Marck; Ey, Pamela

    2010-02-01T23:59:59.000Z

    Motivation – Investigations of large-scale outages in the North American interconnected electric system often attribute the causes to three T’s: Trees, Training and Tools. To document and understand the mental processes used by expert operators when making critical decisions, a naturalistic decision making (NDM) model was developed. Transcripts of conversations were analyzed to reveal and assess NDM-based performance criteria. Findings/Design – An item analysis indicated that the operators’ Situation Awareness Levels, mental models, and mental simulations can be mapped at different points in the training scenario. This may identify improved training methods or analytical/ visualization tools. Originality/Value – This study applies for the first time, the concepts of Recognition Primed Decision Making, Situation Awareness Levels and Cognitive Task Analysis to training of electric power system operators. Take away message – The NDM approach provides a viable framework for systematic training management to accelerate learning in simulator-based training scenarios for power system operators and teams.

  2. RECYCLING AND GENERAL WASTE MANAGEMENT OPERATIONAL PROCEDURE

    E-Print Network [OSTI]

    Harman, Neal.A.

    RECYCLING AND GENERAL WASTE MANAGEMENT OPERATIONAL PROCEDURE Swansea University Estates Services.6.1/1 Recycling & General Waste Management Department: Estates & Facilities Management Site: Swansea University recycling and waste management facilities in Swansea university To ensure that Waste Management Objectives

  3. Onsite Wastewater Treatment Systems: Operation and Maintenance

    E-Print Network [OSTI]

    Lesikar, Bruce J.

    2008-10-23T23:59:59.000Z

    To prevent health hazards to people and pollution in the environment, septic tank systems must be operated and maintained properly. This publication explains how septic systems work and how to keep them running properly....

  4. Energy efficient operating systems and software

    E-Print Network [OSTI]

    Sinha, Amit, 1976-

    2001-01-01T23:59:59.000Z

    Energy efficient system design is becoming increasingly important with the proliferation of portable, battery-operated appliances such as laptops, Personal Digital Assistants (PDAs) and cellular phones. Numerous dedicated ...

  5. Independent Activity Report, Richland Operations Office - June...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    June 20-22, 2011, at the Cold Vacuum Drying Facility at the Department of Energy's Hanford Site. The activity consisted of observing an operational assessment of the facility's...

  6. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    wind industries, and significant first-hand knowledge of offshore installation, operation and maintenance (IO&M) activities. The aim of the GL GH study was to enable project...

  7. Empowering Operators to Drive Sustainable Savings

    E-Print Network [OSTI]

    Reitmeier, T.

    2013-01-01T23:59:59.000Z

    CEPSA operates a complex steam, fuel gas and hot oil network at its chemical complex that produces Purified Terephthalic Acid (PTA) at San Roque (Spain). The site also contracts with neighboring industrial facilities for the exchange of steam, water...

  8. National Security Technology Incubator Operations Plan

    SciTech Connect (OSTI)

    None

    2008-04-30T23:59:59.000Z

    This report documents the operations plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program will focus on serving businesses with national security technology applications by nurturing them through critical stages of early development. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). The operation plan includes detailed descriptions of the structure and organization, policies and procedures, scope, tactics, and logistics involved in sustainable functioning of the NSTI program. Additionally, the operations plan will provide detailed descriptions of continuous quality assurance measures based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Forms that assist in operations of NSTI have been drafted and can be found as an attachment to the document.

  9. Quantum Operator Design for Lattice Baryon Spectroscopy

    SciTech Connect (OSTI)

    Adam Lichtl

    2007-09-06T23:59:59.000Z

    A previously-proposed method of constructing spatially-extended gauge-invariant three-quark operators for use in Monte Carlo lattice QCD calculations is tested, and a methodology for using these operators to extract the energies of a large number of baryon states is developed. This work is part of a long-term project undertaken by the Lattice Hadron Physics Collaboration to carry out a first-principles calculation of the low-lying spectrum of QCD. The operators are assemblages of smeared and gauge-covariantly-displaced quark fields having a definite flavor structure. The importance of using smeared fields is dramatically demonstrated. It is found that quark field smearing greatly reduces the couplings to the unwanted high-lying short-wavelength modes, while gauge field smearing drastically reduces the statistical noise in the extended operators.

  10. Performing process migration with allreduce operations

    DOE Patents [OSTI]

    Archer, Charles Jens (Rochester, MN); Peters, Amanda (Rochester, MN); Wallenfelt, Brian Paul (Plymouth, MN)

    2010-12-14T23:59:59.000Z

    Compute nodes perform allreduce operations that swap processes at nodes. A first allreduce operation generates a first result and uses a first process from a first compute node, a second process from a second compute node, and zeros from other compute nodes. The first compute node replaces the first process with the first result. A second allreduce operation generates a second result and uses the first result from the first compute node, the second process from the second compute node, and zeros from others. The second compute node replaces the second process with the second result, which is the first process. A third allreduce operation generates a third result and uses the first result from first compute node, the second result from the second compute node, and zeros from others. The first compute node replaces the first result with the third result, which is the second process.

  11. Evaluating Utility System Operations Using APLUS

    E-Print Network [OSTI]

    Pethe, S.; Singh, R.

    "Evaluating utility System Operations Using APLUS" Sanjay Pethe Sr. Process Engineer TENSA Services, Inc. 6200 Savoy Drive, Ste. 540 Houston, Texas 77036 ABSTRACT The steam system at a recycled paper fiberboard plant in Texas... Figure 1: Schematic of Steam System 86 "Evaluating utility System Operations Using APLUS" Sanjay Pethe Sr. Process Engineer Rajiv Singh Sr. Process Engineer TENSA Services, Inc. 6200 Savoy Drive, Ste. 540 Houston, Texas 77036 TENSA Services, Inc. 6200...

  12. Improving Unit Operations-Test Station Performance

    E-Print Network [OSTI]

    Filak, J. J. Jr.

    IMPROVING UNIT OPERATIONS - TEST STATION PERFORMANCE JosqIb 1. Filak. Jr, ? Corporate Energy Manager. Park.er?Hannafin COfpontioo- Cleveland. Oh ABSTRACT: This program's basic concept deals with the possibilities for reducing energy efficiency... requirements, control operation test performance functions more successfully, and retain peak load surges from reaching higher utility rate expense levels. 142 ESL-IE-95-04-23 Proceedings from the Seventeenth Industrial Energy Technology Conference...

  13. Developing Geospatial Intelligence Stewardship for Multinational Operations

    E-Print Network [OSTI]

    Thomas, Jeff

    2009-11-18T23:59:59.000Z

    Developing Geospatial Intelligence Stewardship for Multinational Operations Jeff Thomas, BA, MPPA, MS Major, US Army Corps of Engineers Student, Space Operations US Army Command & General Staff College Fort Leavenworth, Kansas GIS Day @ KU Nov 18..., 2009 GEOINT Stewardship • “The practice and responsibility of assuring decision makers that geospatial intelligence resources are properly utilized and developed.” • I propose – That a higher level of cognitive understanding for GEOINT comprehension...

  14. Operational Effectiveness in Use fo BAS

    E-Print Network [OSTI]

    Bobker, M.; Joseph, M.; Ascazubi, M.; Brown, T.; Thorpe, K.; Essman, J.

    2013-01-01T23:59:59.000Z

    , making it an under-utilized resource. We do not have an established industry baseline of how operators use BAS nor what best practices might be. An ASHRAE research project is surveying operators to investigate desirable ?dashboard? interfaces...-to-machine feedback is most advanced in the area of Demand Response, where initiation of a special mode activates prioritized load-shedding to meet a pre- determined kw level. The major controls manufacturers have prototypes for machine-to- machine oversight...

  15. Confortable Performance: Retro-Commissioning Building Operations

    E-Print Network [OSTI]

    Botan, L.

    2013-01-01T23:59:59.000Z

    troubleshooting ? New controls strategies ? Equipment schedule optimization ? Comfort improvements 7 ESL-IC-13-10-07 Proceedings of the 13th International Conference for Enhanced Building Operations, Montreal, Quebec, October 8-11, 2013 Tools ? Actuator... Operations, Montreal, Quebec, October 8-11, 2013 Example 1 ? Problem ? Monday morning ?too cold? complaints ? Solution ? Heating system start-up on Sunday at 2:00pm ? RCx Investigation ? Tenant MAU running 24x7 with no heat (space temperature...

  16. Reservoir analysis model for battlefield operations

    E-Print Network [OSTI]

    Sullivan, Garrett James

    1988-01-01T23:59:59.000Z

    RESERVOIR ANALYSIS MODEL FOR BATTLEFIELD OPERATIONS A Thesis by GARRETT JAMES SULLIVAN Submitted to the Graduate College of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE December 1988... Major Subject: Civil Engineering RESERVOIR ANALYSIS MODEL FOR BATTLEFIELD OPERATIONS A Thesis by GARRETT JAMES SULLIVAN Approved as to style and content by: Ralp A. Wurbs (Chair of Committee) mes (N er) neth tr ek Nem e Charles . a es...

  17. Statistical pert analysis using integral operators

    E-Print Network [OSTI]

    Ohlendorf, Curtis Gilbert

    1969-01-01T23:59:59.000Z

    of Optimization Algorithm. IV CONCLUSIONS AND SUMMARY. 23 25 27 BIBLIOGRAPHY' 29 VITA. 30 vi LIST OF FIGURES Figure Page 2. 1 Activities In Parallel. 2. 2 Activities In Series. 2. 3 2. 4 Wheatstone Bridge Double Wheatstone Bridge. 10 10 2. 5...] extended Hartley and Wortham's method by developing integral operators for activities in double wheatstone bridges and in different types of crise-crosses. Ringer [8] also developed integral operators for activities whose completion times...

  18. Iran moves to beef up downstream operations

    SciTech Connect (OSTI)

    Tippee, B.

    1996-02-26T23:59:59.000Z

    This paper reviews the plans of the Iranian oil and gas industry to rebuild their oil and gas processing and distribution network. It describes the construction and operation of two natural gas processing plants along with a gas condensate processing plant. Another project is a liquefied petroleum gas processing facility which is also discussed. Plant capacities and specifications of operations are discussed along with the various types of processing and treatment equipment and needed pipeline construction.

  19. 1987 DOE review: First collider run operation

    SciTech Connect (OSTI)

    Childress, S.; Crawford, J.; Dugan, G.; Edwards, H.; Finley, D.A.; Fowler, W.B.; Harrison, M.; Holmes, S.; Makara, J.N.; Malamud, E.

    1987-05-01T23:59:59.000Z

    This review covers the operations of the first run of the 1.8 TeV superconducting super collider. The papers enclosed cover: PBAR source status, fixed target operation, Tevatron cryogenic reliability and capacity upgrade, Tevatron Energy upgrade progress and plans, status of the D0 low beta insertion, 1.8 K and 4.7 K refrigeration for low-..beta.. quadrupoles, progress and plans for the LINAC and booster, near term and long term and long term performance improvements.

  20. RADCAL Operations Manual Radiation Calibration Laboratory Protocol

    SciTech Connect (OSTI)

    Bogard, J.S.

    1998-12-01T23:59:59.000Z

    The Life Sciences Division (LSD) of Oak Ridge National Laboratory (ORNL) has a long record of radiation dosimetry research, primarily using the Health Physics Research Reactor (HPRR) and the Radiation Calibration Laboratory (RADCAL) in its Dosimetry Applications Research (DOSAR) Program. These facilities have been used by a broad segment of the research community to perform a variety of experiments in areas including, but not limited to, radiobiology, radiation dosimeter and instrumentation development and calibration, and the testing of materials in a variety of radiation environments. Operations of the HPRR were terminated in 1987 and the reactor was moved to storage at the Oak Ridge Y-12 Plant; however, RADCAL will continue to be operated in accordance with the guidelines of the National Institute of Standards and Technology (NIST) Secondary Calibration Laboratory program and will meet all requirements for testing dosimeters under the National Voluntary Laboratory Accreditation Program (NVLAP). This manual is to serve as the primary instruction and operation manual for the Oak Ridge National Laboratory's RADCAL facility. Its purpose is to (1) provide operating protocols for the RADCAL facility, (2) outline the organizational structure, (3) define the Quality Assurance Action Plan, and (4) describe all the procedures, operations, and responsibilities for the safe and proper operation of all routine aspects of the calibration facility.

  1. Field Operations Program Activities Status Report

    SciTech Connect (OSTI)

    J. E. Francfort; D. V. O'Hara; L. A. Slezak

    1999-05-01T23:59:59.000Z

    The Field Operations Program is an electric vehicle testing and evaluation program sponsored by US Department of Energy and managed by the Idaho National Engineering and Environmental Laboratory. The Program's goals are to evaluate electric vehicles in real-world applications and environments, support electric vehicle technology advancement, develop infrastructure elements necessary to support significant electric vehicle use, support increased use of electric vehicles in federal fleets, and increase overall awareness and acceptance of electric vehicles. This report covers Program activities from fiscal year 1997 through mid-fiscal year 1999. The Field Operations Program succeeded the Site Operator Program, which ended in September 1996. Electric vehicle testing conducted by the Program includes baseline performance testing (EV America testing), accelerated reliability (life-cycle) testing, and fleet testing. The baseline performance parameters include accelerations, braking, range, energy efficiency, and charging time. The Program collects accelerated reliability and fleet operations data on electric vehicles operated by the Program's Qualified Vehicle Testing (QVT) partners. The Program's QVT partners have over 3 million miles of electric vehicle operating experience.

  2. Smart Grid - Transforming Power System Operations

    SciTech Connect (OSTI)

    Widergren, Steven E.; Kirkham, Harold

    2010-04-28T23:59:59.000Z

    Abstract—Electric power systems are entering a new realm of operations. Large amounts of variable generation tax our ability to reliably operate the system. Couple this with a greater reliance on the electricity network to serve consumer demand that is likely to rise significantly even as we drive for greater efficiency. Trade-offs between energy and environmental needs will be constantly negotiated, while a reliable supply of electricity needs even greater assurance in a world where threats of disruption have risen. Smart grid capabilities are being proposed to help address the challenges confronting system operations. This paper reviews the impact of smart grid functionality on transforming power system operations. It explores models for distributed energy resources (DER – generation, storage, and load) that are appearing on the system. It reviews the evolving nature of electricity markets to deal with this complexity and a change of emphasis on signals from these markets to affect power system control. Smart grid capabilities will also impact reliable operations, while cyber security issues must be addressed as a culture change that influences all system design, implementation, and maintenance. Lastly, the paper explores significant questions for further research and the need for a simulation environment that supports such investigation and informs deployments to mitigate operational issues as they arise.

  3. Naturalistic Decision Making For Power System Operators

    SciTech Connect (OSTI)

    Greitzer, Frank L.; Podmore, Robin; Robinson, Marck; Ey, Pamela

    2009-06-23T23:59:59.000Z

    Abstract: Motivation -- As indicated by the Blackout of 2003, the North American interconnected electric system is vulnerable to cascading outages and widespread blackouts. Investigations of large scale outages often attribute the causes to the three T’s: Trees, Training and Tools. A systematic approach has been developed to document and understand the mental processes that an expert power system operator uses when making critical decisions. The approach has been developed and refined as part of a capability demonstration of a high-fidelity real-time power system simulator under normal and emergency conditions. To examine naturalistic decision making (NDM) processes, transcripts of operator-to-operator conversations are analyzed to reveal and assess NDM-based performance criteria. Findings/Design -- The results of the study indicate that we can map the Situation Awareness Level of the operators at each point in the scenario. We can also identify clearly what mental models and mental simulations are being performed at different points in the scenario. As a result of this research we expect that we can identify improved training methods and improved analytical and visualization tools for power system operators. Originality/Value -- The research applies for the first time, the concepts of Recognition Primed Decision Making, Situation Awareness Levels and Cognitive Task Analysis to training of electric power system operators. Take away message -- The NDM approach provides an ideal framework for systematic training management and mitigation to accelerate learning in team-based training scenarios with high-fidelity power grid simulators.

  4. Hanford Site air operating permit application

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  5. Westinghouse Hanford Company Conduct of Operations Manual: GOCO Cross-Cultivation Committee, Operational Excellence Task Force

    SciTech Connect (OSTI)

    Schilperoort, D.

    1991-11-01T23:59:59.000Z

    This manual has been prepared to establish guidelines that are to be used at all Westinghouse Government Operations Business Unit (GOBU) sites and Westinghouse Savannah River Company (WSRC). The purpose of the manual is to establish standards that comply with the requirements of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities'' and that will be used at all Westinghouse Government Operations Business Unit sites and Westinghouse Savannah River Company.

  6. Westinghouse Hanford Company Conduct of Operations Manual: GOCO Cross-Cultivation Committee, Operational Excellence Task Force

    SciTech Connect (OSTI)

    Schilperoort, D.

    1991-11-01T23:59:59.000Z

    This manual has been prepared to establish guidelines that are to be used at all Westinghouse Government Operations Business Unit (GOBU) sites and Westinghouse Savannah River Company (WSRC). The purpose of the manual is to establish standards that comply with the requirements of Department of Energy (DOE) Order 5480.19, ``Conduct of Operations Requirements for DOE Facilities`` and that will be used at all Westinghouse Government Operations Business Unit sites and Westinghouse Savannah River Company.

  7. Type A Accident Investigation Report – Western Area Power Administration Investigation of the June 7, 2004, Construction Contractor Electrical Accident at Double-Circuit Structure 38/1, Watertown-Granite Falls 230-kV Transmission Line East of Watertown, S

    Broader source: Energy.gov [DOE]

    This report is an independent product of the Type A Accident Investigation board appointed by Timothy J. Meeks, Chief Operating Officer, Western Area Power Administration.

  8. Generalized computer-assisted operations; A comprehensive system for day-to-day oilfield operations

    SciTech Connect (OSTI)

    Dunham, C.L.; Anderson, S.R. (Shell Oil Co. (US))

    1991-03-01T23:59:59.000Z

    This paper reports that Shell Oil Co. and a U.S. subsidiary, Shell Western E and P Inc., developed a comprehensive, generalized, computer-assisted-operations (CAO) system for day-to-day oilfield operations. The system addresses many of the daily operating needs of data acquisition, well and facility monitoring and control, problem detection and diagnosis, design and/or redesign of artificial-lift systems, and oilfield data management. It is generalized in that one system, with common computer hardware, software, and techniques, serves several different oil fields with diverse operating requirements and conditions.

  9. Operational control of boiling water reactor stability

    SciTech Connect (OSTI)

    Mowry, C.M. [PECO Energy, Wayne, PA (United States); Nir, I. [Entergy Operations, Jackson, MS (United States); Newkirk, D.W. [GE Nuclear Energy, San Jose, CA (United States)

    1995-03-01T23:59:59.000Z

    Boiling water reactor cores are susceptible to instabilities, which generate power oscillations. Specific reactor operating practices can provide a mechanism for control of the instability phenomenon. An axial separation of the core into a single-phase region and a two-phase region resolves the influence of axial flux shapes on core stability. This separation provides the means to derive a core stability control that ensures significant reactor stability margin. The control is achieved by maintaining the core average bulk coolant saturation elevation above a predetermined axial plane. The control can be reliably and efficiently implemented during reactor operations. Analysis demonstrates that variations in parameters important to stability have only secondary influences on stability margin when the control is in effect. Actual plant experience with a large commercial boiling water reactor confirms the capabilities of this stability control in an operational setting.

  10. SPEAR 3: the First Year of Operation

    SciTech Connect (OSTI)

    Hettel, R.O.; /SLAC

    2006-02-10T23:59:59.000Z

    The first electrons were accumulated in the newly completed 3-GeV SPEAR 3 storage ring on December 15, 2003, five days after the beginning of commissioning. By mid-January of 2004, 100 mA were stored, the maximum current allowed in the first phase of SPEAR 3 operation, and ring characterization and tuning continued until early March when the first photon beam line was opened for users. After the first year of operation the SPEAR 3 beam properties and ring performance had been extensively measured. These include micron stability using slow orbit feedback, an emittance coupling of {approx}0.1% and 50-h lifetimes. The performance of SPEAR 3 during its first year of commissioning and operation and the improvement plans are described.

  11. Performing an allreduce operation using shared memory

    DOE Patents [OSTI]

    Archer, Charles J. (Rochester, MN); Dozsa, Gabor (Ardsley, NY); Ratterman, Joseph D. (Rochester, MN); Smith, Brian E. (Rochester, MN)

    2012-04-17T23:59:59.000Z

    Methods, apparatus, and products are disclosed for performing an allreduce operation using shared memory that include: receiving, by at least one of a plurality of processing cores on a compute node, an instruction to perform an allreduce operation; establishing, by the core that received the instruction, a job status object for specifying a plurality of shared memory allreduce work units, the plurality of shared memory allreduce work units together performing the allreduce operation on the compute node; determining, by an available core on the compute node, a next shared memory allreduce work unit in the job status object; and performing, by that available core on the compute node, that next shared memory allreduce work unit.

  12. Concept of Operations for Data Fusion Visualization

    SciTech Connect (OSTI)

    T.R. McJunkin; R.L. Boring; M.A. McQueen; L.P. Shunn; J.L. Wright; D.I. Gertman; O. Linda; K. McCarty; M. Manic

    2011-09-01T23:59:59.000Z

    Situational awareness in the operations and supervision of a industrial system means that decision making entity, whether machine or human, have the important data presented in a timely manner. An optimal presentation of information such that the operator has the best opportunity accurately interpret and react to anomalies due to system degradation, failures or adversaries. Anticipated problems are a matter for system design; however, the paper will focus on concepts for situational awareness enhancement for a human operator when the unanticipated or unaddressed event types occur. Methodology for human machine interface development and refinement strategy is described for a synthetic fuels plant model. A novel concept for adaptively highlighting the most interesting information in the system and a plan for testing the methodology is described.

  13. Document control and Conduct of Operations

    SciTech Connect (OSTI)

    Collins, S.K.; Meltzer, F.L.

    1993-01-01T23:59:59.000Z

    Department of Energy (DOE) Order 5480.19, Conduct of operations, places stringent requirements on a wide range of activities at DOE facilities. These requirements directly affect personnel at the Advanced Test Reactor (ATR), which is located in the Test Reactor Area of the Idaho National Engineering Laboratory and operated for DOE by EG G Idaho, Inc. In order for the ATR to comply with 5480.19, the very personality of the reactor facility's document control unit has had to undergo a major change. The Facility and Administrative Support Unit (FAS) is charged with nudntenance of ATR's controlled ddcuments-diousands of operating and administrative procedures. Prior to the imposition of 5480.19, FAS was content to operate in a clerical support mode, seldom questioning or seeking to improve. This numer of doing business is inappropriate within the framework of DOE 5480.19 and is also at odds with the approach to Total Quality Management (TQM) promulgated by EG G Idaho.To comply with the requirements of 5480.19, FAS has Actively applied TQM principles. Empowered personnel to unprove operations through the establishment of a teatn approach. Begun an automation process that is already paying large dividends in terms of improved procedure accuracy and compliance. A state-of-the-art text retrival system is already in place. We are vigorously pursuing fully automated document tmcidng and document management. This paper describes in detail the steps taken to date, the improvements and the lessons learned. It aLw discusses plans for the future that will enable FAS to support the ATR in inccreasing its responsiveness to the Conduct of Operations Order.

  14. Cultural intelligence support for military operations

    SciTech Connect (OSTI)

    Guthormsen, Amy M. [Los Alamos National Laboratory; MacKerrow, Edward P [Los Alamos National Laboratory; Merritt, Terence M [Los Alamos National Laboratory; Morgart, Ruth E [INTERNATIONAL ATOMIC ENERGY

    2010-04-08T23:59:59.000Z

    It has long been recognized that military success relies on knowledge of the enemy. In the context of standard warfare, adequate knowledge of the enemy may be gained by analyzing observable, measurable data. In the context of modern counterinsurgency operations and the global war on terror, the task of predicting the behavior of the enemy is vastly more complex and difficult. Without an understanding of the ways individuals in the host nation interpret and react to events, no amount of objective information can provide the insight required to accurately predict behavior. US military doctrine has begun to recognize the importance of the many ways that local culture can affect operation success. Increasingly military decision makers use cultural information in the service of operation planning, and troops are provided with pre-deployment cultural training. However, no amount of training can cover the breadth and depth of potentially useful cultural information, and no amount of careful planning can avoid the need to adapt as situations develop. Therefore, a critical challenge is to provide useful tools to US personnel in their efforts to collect, analyze, and utilize cultural information. Essential functions for cultural support tools include the following: (1) to narrow down a broad range of available data and focus the user's attention on context-relevant information, (2) to present cultural information in an easily understood form, (3) to prompt the user to seek relevant information in the environment, (4) to synthesize information, and (5) to predict outcomes based on possible courses of operation. In this paper, we begin by reviewing the ways in which military operations can benefit from cultural intelligence. We then discuss frameworks for analyzing cultural information in the context of a military operation. We conclude with a demonstration of our current efforts to develop a tool that meets the aforementioned functional challenges.

  15. Testing sand used in hydraulic fracturing operations

    SciTech Connect (OSTI)

    Not Available

    1983-03-01T23:59:59.000Z

    Recommended practices for testing sand used in hydraulic fracturing operations are outlined as developed by the Task Group on Evaluation of Hydraulic Fracturing Sand under the API Subcommittee on Evaluation of Well Completion Materials. The tests recommended were developed to improve the quality of frac sand delivered to the well site, and are for use in evaluating certain physical properties of sand used in hydraulic fracturing operations. The tests suggested enable users to compare physical characteristics of various sands and to select materials most useful for such applications. Parameters to be tested include turbidity, clay and soft particle content, crush resistance, and mineralogic analysis.

  16. Process for operating equilibrium controlled reactions

    DOE Patents [OSTI]

    Nataraj, Shankar (Allentown, PA); Carvill, Brian Thomas (Orefield, PA); Hufton, Jeffrey Raymond (Fogelsville, PA); Mayorga, Steven Gerard (Allentown, PA); Gaffney, Thomas Richard (Allentown, PA); Brzozowski, Jeffrey Richard (Bethlehem, PA)

    2001-01-01T23:59:59.000Z

    A cyclic process for operating an equilibrium controlled reaction in a plurality of reactors containing an admixture of an adsorbent and a reaction catalyst suitable for performing the desired reaction which is operated in a predetermined timed sequence wherein the heating and cooling requirements in a moving reaction mass transfer zone within each reactor are provided by indirect heat exchange with a fluid capable of phase change at temperatures maintained in each reactor during sorpreaction, depressurization, purging and pressurization steps during each process cycle.

  17. Scalar operators in solid-state NMR

    SciTech Connect (OSTI)

    Sun, Boqin

    1991-11-01T23:59:59.000Z

    Selectivity and resolution of solid-state NMR spectra are determined by dispersion of local magnetic fields originating from relaxation effects and orientation-dependent resonant frequencies of spin nuclei. Theoretically, the orientation-dependent resonant frequencies can be represented by a set of irreducible tensors. Among these tensors, only zero rank tensors (scalar operators) are capable of providing high resolution NMR spectra. This thesis presents a series of new developments in high resolution solid-state NMR concerning the reconstruction of various scalar operators motion in solid C{sub 60} is analyzed.

  18. Conduct of Operations and Quality Assurance Compliance

    SciTech Connect (OSTI)

    Andrews, N.S.

    1992-06-01T23:59:59.000Z

    The purpose of this document is to present and detail the deliverables for the Tiger Team Action Plan, Finding MF-11, and milestones in the FY92 Performance Appraisal for Conduct of Operations from Sandia National Laboratories to DOE. The ``Proposal for Reporting Conduct of Operations & Quality Assurance Compliance to DOE`` describes what the deliverables shall be. Five major steps that result in the development of line practices are covered in this document. These line practices specify what Sandia will do to comply with the above DOE management orders. The five steps include: hazard classification; programmatic risk classification; management grouping; compliance plan; and corporate reporting.

  19. Conduct of Operations and Quality Assurance Compliance

    SciTech Connect (OSTI)

    Andrews, N.S.

    1992-06-01T23:59:59.000Z

    The purpose of this document is to present and detail the deliverables for the Tiger Team Action Plan, Finding MF-11, and milestones in the FY92 Performance Appraisal for Conduct of Operations from Sandia National Laboratories to DOE. The Proposal for Reporting Conduct of Operations Quality Assurance Compliance to DOE'' describes what the deliverables shall be. Five major steps that result in the development of line practices are covered in this document. These line practices specify what Sandia will do to comply with the above DOE management orders. The five steps include: hazard classification; programmatic risk classification; management grouping; compliance plan; and corporate reporting.

  20. Magnetic Schrödinger operators on armchair nanotubes

    E-Print Network [OSTI]

    Evgeny Korotyaev; Andrey Badanin

    2008-04-01T23:59:59.000Z

    We consider the Schr\\"odinger operator with a periodic potential on a quasi 1D continuous periodic model of armchair nanotubes in $\\R^3$ in a uniform magnetic field (with amplitude $B\\in \\R$), which is parallel to the axis of the nanotube. The spectrum of this operator consists of an absolutely continuous part (spectral bands separated by gaps) plus an infinite number of eigenvalues with infinite multiplicity. We describe all eigenfunctions with the same eigenvalue including compactly supported. We describe the spectrum as a function of $B$. For some specific potentials we prove an existence of gaps independent on the magnetic field. If $B\

  1. Schrödinger operators on armchair nanotubes. I

    E-Print Network [OSTI]

    Andrey Badanin; Jochen Brüning; Evgeny Korotyaev; Igor Lobanov

    2007-07-26T23:59:59.000Z

    We consider the Schr\\"odinger operator with a periodic potential on quasi-1D models of armchair single-wall nanotubes. The spectrum of this operator consists of an absolutely continuous part (intervals separated by gaps) plus an infinite number of eigenvalues with infinite multiplicity. We describe all eigenfunctions with the same eigenvalue. We define a Lyapunov function, which is analytic on some Riemann surface. On each sheet, the Lyapunov function has the same properties as in the scalar case, but it has branch points, which we call resonances. In example we show the existence of real and complex resonances for some specific potentials.

  2. Operator Analysis of Neutrinoless Double Beta Decay

    E-Print Network [OSTI]

    Kiwoon Choi; Kwang Sik Jeong; Wan Young Song

    2002-07-19T23:59:59.000Z

    We study the effective operators of the standard model fields which would yield an observable rate of neutrinoless double beta decay. We particularly focus on the possibility that neutrinoless double beta decay is dominantly induced by lepton-number-violating higher dimensional operators other than the Majorana neutrino mass. Our analysis can be applied to models in which neutrinoless double beta decay is induced either by a strong dynamics or by quantum gravity effects at a fundamental scale near the TeV scale as well as the conventional models in which neutrinoless double beta decay is induced by perturbative renormalizable interactions.

  3. A guide to coalbed methane operations

    SciTech Connect (OSTI)

    Hollub, V.A.; Schafer, P.S.

    1992-01-01T23:59:59.000Z

    A guide to coalbed methane production is presented. The guide provides practical information on siting, drilling, completing, and producing coalbed methane wells. Information is presented for experienced coalbed methane producers and coalbed methane operations. The information will assist in making informed decisions about producing this resource. The information is presented in nine chapters on selecting and preparing of field site, drilling and casing the wellbore, wireline logging, completing the well, fracturing coal seams, selecting production equipment and facilities, operating wells and production equipment, treating and disposing of produced water, and testing the well.

  4. On the logical operators of quantum codes

    E-Print Network [OSTI]

    Mark M. Wilde

    2009-03-30T23:59:59.000Z

    I show how applying a symplectic Gram-Schmidt orthogonalization to the normalizer of a quantum code gives a different way of determining the code's logical operators. This approach may be more natural in the setting where we produce a quantum code from classical codes because the generator matrices of the classical codes form the normalizer of the resulting quantum code. This technique is particularly useful in determining the logical operators of an entanglement-assisted code produced from two classical binary codes or from one classical quaternary code. Finally, this approach gives additional formulas for computing the amount of entanglement that an entanglement-assisted code requires.

  5. Operating Experience Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDiesel Engines |Open Source SoftwareOperatingOperating

  6. APS Operational Statistics for FY 2015

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLasDelivered‰PNGExperience4AJ01) (See95TI07)Operations2AP-XPSAPS5 Operational Statistics Back to

  7. Operations Committee | Photosynthetic Antenna Research Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 TechnicalOilOnlineandOperations andOperations

  8. PWR core monitoring and simulation during load follow operation

    SciTech Connect (OSTI)

    Beard, C. (Westinghouse Electric Corp., Pittsburgh, PA (USA). Commercial Nuclear Fuel Div.); Winter, M.; Niederer, R. (Commonwealth Edison Co., Zion, IL (USA))

    1989-01-01T23:59:59.000Z

    This paper presents a new operation core support system developed for pressurized water reactors. This system provides an enhanced understanding of the operating core with significant benefits in operational flexibility. It also permits evaluation of alternatives and specific situations that allows for enhanced operation of the unit, which provides benefits in power capability and minimizes potential operational issues.

  9. FLORIDA ATLANTIC UNIVERSITY 2004-2005 UNIVERSITY OPERATING BUDGET

    E-Print Network [OSTI]

    Fernandez, Eduardo

    1 FLORIDA ATLANTIC UNIVERSITY 2004-2005 UNIVERSITY OPERATING BUDGET JULY 1, 2004 TO DECEMBER 31, 2004 SECOND QUARTER REPORT Educational and General Operating Budget Student Financial Aid Operating Budget Grants and Contracts-Sponsored Research Operating Budget Auxiliary Enterprises Operating Budget

  10. FLORIDA ATLANTIC UNIVERSITY 2004-2005 UNIVERSITY OPERATING BUDGET

    E-Print Network [OSTI]

    Fernandez, Eduardo

    1 FLORIDA ATLANTIC UNIVERSITY 2004-2005 UNIVERSITY OPERATING BUDGET JULY 1, 2004 TO MARCH 31, 2005 THIRD QUARTER REPORT Educational and General Operating Budget Student Financial Aid Operating Budget Grants and Contracts-Sponsored Research Operating Budget Auxiliary Enterprises Operating Budget Athletics

  11. FLORIDA ATLANTIC UNIVERSITY 2004-2005 UNIVERSITY OPERATING BUDGET

    E-Print Network [OSTI]

    Fernandez, Eduardo

    FLORIDA ATLANTIC UNIVERSITY 2004-2005 UNIVERSITY OPERATING BUDGET JULY 1, 2004 TO SEPTEMBER 30, 2004 FIRST QUARTER REPORT Educational and General Operating Budget Student Financial Aid Operating Budget Grants and Contracts-Sponsored Research Operating Budget Auxiliary Enterprises Operating Budget

  12. FLORIDA ATLANTIC UNIVERSITY 2008-09 UNIVERSITY OPERATING BUDGET

    E-Print Network [OSTI]

    Fernandez, Eduardo

    1 FLORIDA ATLANTIC UNIVERSITY 2008-09 UNIVERSITY OPERATING BUDGET JULY 1, 2008 TO DECEMBER 31, 2008 SECOND QUARTER REPORT Educational and General Operating Budget Student Financial Aid Operating Budget Grants and Contracts-Sponsored Research Operating Budget Auxiliary Enterprises Operating Budget Athletics

  13. FLORIDA ATLANTIC UNIVERSITY 2005-2006 UNIVERSITY OPERATING BUDGET

    E-Print Network [OSTI]

    Fernandez, Eduardo

    1 FLORIDA ATLANTIC UNIVERSITY 2005-2006 UNIVERSITY OPERATING BUDGET JULY 1, 2005 TO DECEMBER 31, 2005 SECOND QUARTER REPORT Educational and General Operating Budget Student Financial Aid Operating Budget Grants and Contracts-Sponsored Research Operating Budget Auxiliary Enterprises Operating Budget

  14. FLORIDA ATLANTIC UNIVERSITY 2010-11 UNIVERSITY OPERATING BUDGET

    E-Print Network [OSTI]

    Fernandez, Eduardo

    1 FLORIDA ATLANTIC UNIVERSITY 2010-11 UNIVERSITY OPERATING BUDGET JULY 1, 2010 TO DECEMBER 31, 2010 SECOND QUARTER REPORT Educational and General Operating Budget Student Financial Aid Operating Budget Grants and Contracts-Sponsored Research Operating Budget Auxiliary Enterprises Operating Budget

  15. FLORIDA ATLANTIC UNIVERSITY 2008-09 UNIVERSITY OPERATING BUDGET

    E-Print Network [OSTI]

    Fernandez, Eduardo

    1 FLORIDA ATLANTIC UNIVERSITY 2008-09 UNIVERSITY OPERATING BUDGET JULY 1, 2008 TO SEPTEMBER 30, 2008 FIRST QUARTER REPORT Educational and General Operating Budget Student Financial Aid Operating Budget Grants and Contracts-Sponsored Research Operating Budget Auxiliary Enterprises Operating Budget

  16. FLORIDA ATLANTIC UNIVERSITY 2005-2006 UNIVERSITY OPERATING BUDGET

    E-Print Network [OSTI]

    Fernandez, Eduardo

    1 FLORIDA ATLANTIC UNIVERSITY 2005-2006 UNIVERSITY OPERATING BUDGET JULY 1, 2005 TO MARCH 15, 2006 THIRD QUARTER REPORT Educational and General Operating Budget Student Financial Aid Operating Budget Grants and Contracts-Sponsored Research Operating Budget Auxiliary Enterprises Operating Budget Athletics

  17. FLORIDA ATLANTIC UNIVERSITY 2007-2008 UNIVERSITY OPERATING BUDGET

    E-Print Network [OSTI]

    Fernandez, Eduardo

    1 FLORIDA ATLANTIC UNIVERSITY 2007-2008 UNIVERSITY OPERATING BUDGET JULY 1, 2007 TO MARCH 31, 2008 THIRD QUARTER REPORT Educational and General Operating Budget Student Financial Aid Operating Budget Grants and Contracts-Sponsored Research Operating Budget Auxiliary Enterprises Operating Budget Athletics

  18. FLORIDA ATLANTIC UNIVERSITY 2007-2008 UNIVERSITY OPERATING BUDGET

    E-Print Network [OSTI]

    Fernandez, Eduardo

    1 FLORIDA ATLANTIC UNIVERSITY 2007-2008 UNIVERSITY OPERATING BUDGET JULY 1, 2007 TO DECEMBER 31, 2007 SECOND QUARTER REPORT Educational and General Operating Budget Student Financial Aid Operating Budget Grants and Contracts-Sponsored Research Operating Budget Auxiliary Enterprises Operating Budget

  19. FLORIDA ATLANTIC UNIVERSITY 2007-2008 UNIVERSITY OPERATING BUDGET

    E-Print Network [OSTI]

    Fernandez, Eduardo

    1 FLORIDA ATLANTIC UNIVERSITY 2007-2008 UNIVERSITY OPERATING BUDGET JULY 1, 2007 TO SEPTEMBER 30, 2007 FIRST QUARTER REPORT Educational and General Operating Budget Student Financial Aid Operating Budget Grants and Contracts-Sponsored Research Operating Budget Auxiliary Enterprises Operating Budget

  20. FLORIDA ATLANTIC UNIVERSITY 2005-2006 UNIVERSITY OPERATING BUDGET

    E-Print Network [OSTI]

    Fernandez, Eduardo

    1 FLORIDA ATLANTIC UNIVERSITY 2005-2006 UNIVERSITY OPERATING BUDGET JULY 1, 2005 TO SEPTEMBER 30, 2005 FIRST QUARTER REPORT Educational and General Operating Budget Student Financial Aid Operating Budget Grants and Contracts-Sponsored Research Operating Budget Auxiliary Enterprises Operating Budget

  1. Lawrence Berkeley National Laboratory Arboricultural Operations Safety Requirements LBNL Arboricultural Operation Safety Requirements

    E-Print Network [OSTI]

    Eisen, Michael

    Lawrence Berkeley National Laboratory Arboricultural Operations Safety Requirements 1 of 3 LBNL reviewed with LBNL Facilities Electric Shop (6023)? * IF THE ANSWER TO 3E WAS NO, STOP THIS WORK ACTIVITY AND CONTACT FACILITIES ELECTRIC SHOP a. Name of LBNL individual consulted? #12;LBNL Arboricultural Operations

  2. CRAD, Conduct of Operations- Y-12 Enriched Uranium Operations Oxide Conversion Facility

    Broader source: Energy.gov [DOE]

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a January, 2005 assessment of Conduct of Operations program at the Y-12 - Enriched Uranium Operations Oxide Conversion Facility.

  3. Hanford tank waste operation simulator operational waste volume projection verification and validation procedure

    SciTech Connect (OSTI)

    HARMSEN, R.W.

    1999-10-28T23:59:59.000Z

    The Hanford Tank Waste Operation Simulator is tested to determine if it can replace the FORTRAN-based Operational Waste Volume Projection computer simulation that has traditionally served to project double-shell tank utilization. Three Test Cases are used to compare the results of the two simulators; one incorporates the cleanup schedule of the Tri Party Agreement.

  4. Site and Operations Overview 1-1 1. Site and Operations Overview

    E-Print Network [OSTI]

    Pennycook, Steve

    Site and Operations Overview 1-1 1. Site and Operations Overview Setting The Oak Ridge Reservation Ridge Y-12 Plant, Oak Ridge National Laboratory, and East Tennessee Technology Park (formerly the K-25 Ridge Reservation Annual Site Environmental Report and Environmental Monitoring on the Oak Ridge

  5. Method and Apparatus Providing Deception and/or Altered Operation in an Information System Operating System

    DOE Patents [OSTI]

    Cohen, Fred (Livermore, CA); Rogers, Deanna T. (Fremont, CA); Neagoe, Vicentiu (San Leandro, CA)

    2008-10-14T23:59:59.000Z

    A method and/or system and/or apparatus providing deception and/or execution alteration in an information system. In specific embodiments, deceptions and/or protections are provided by intercepting and/or modifying operation of one or more system calls of an operating system.

  6. Level 1: Incidental crane operator`s and incidental rigger`s manual. Revision

    SciTech Connect (OSTI)

    Neubauer, P. [ed.

    1992-11-01T23:59:59.000Z

    This document is a safety manual for incidental crane operators and incidental riggers. The information contained in this manual includes: Terminology and definitions, safety orientation, general operating procedures, high-consequence/high value lifts, sling safety, basic rules of hitching and rigging, and common errors in hitching.

  7. Safe Operating Procedure (Reviewed 7/09)

    E-Print Network [OSTI]

    Farritor, Shane

    procedures for disposal of hazardous and/or radioactive wastes are to be followed. P-33 waste shouldSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: P-33://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

  8. Safe Operating Procedure (Reviewed 7/09)

    E-Print Network [OSTI]

    Farritor, Shane

    mCi. Waste Disposal EHS procedures for disposal of hazardous and/or radioactive wastesSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: H-3://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

  9. Safe Operating Procedure (Reviewed 7/09)

    E-Print Network [OSTI]

    Farritor, Shane

    procedures for disposal of hazardous and/or radioactive wastes are to be followed. Cr-51 waste shouldSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: Cr-51://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

  10. Safe Operating Procedure (Reviewed 7/09)

    E-Print Network [OSTI]

    Farritor, Shane

    through ingestion is 0.6 mCi. Waste Disposal EHS procedures for disposal of hazardous and/or radioactiveSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: P-32://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

  11. Safe Operating Procedure (Revised 9/10)

    E-Print Network [OSTI]

    Farritor, Shane

    ingestion is 0.04 mCi. Waste Disposal EHS procedures for disposal of hazardous and/or radioactive wastesSafe Operating Procedure (Revised 9/10) SAFETY PROTOCOL: I-125://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

  12. Safe Operating Procedure (Reviewed 7/09)

    E-Print Network [OSTI]

    Farritor, Shane

    ingestion is 9.0 mCi. Waste Disposal EHS procedures for disposal of hazardous and/or radioactive wastesSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: Fe-55://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

  13. Safe Operating Procedure (Reviewed 7/09)

    E-Print Network [OSTI]

    Farritor, Shane

    ingestion is 6 mCi. Waste Disposal EHS procedures for disposal of hazardous and/or radioactive wastesSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: S-35://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

  14. Safe Operating Procedure (Reviewed 7/09)

    E-Print Network [OSTI]

    Farritor, Shane

    for disposal of hazardous and/or radioactive wastes are to be followed. Ca- 45 waste should be segregated fromSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: Ca-45://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

  15. Safe Operating Procedure (Reviewed 7/09)

    E-Print Network [OSTI]

    Farritor, Shane

    .4 mCi. Waste Disposal EHS procedures for disposal of hazardous and/or radioactive wastesSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: Na-22://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

  16. Safe Operating Procedure (Reviewed 7/09)

    E-Print Network [OSTI]

    Farritor, Shane

    for disposal of hazardous and/or radioactive wastes are to be followed. Cl-36 waste should be segregated fromSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: Cl-36://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

  17. Safe Operating Procedure (Reviewed 7/09)

    E-Print Network [OSTI]

    Farritor, Shane

    of hazardous and/or radioactive wastes are to be followed. C-14 waste can be combined with H-3 wasteSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: C-14://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

  18. Safe Operating Procedure SAFETY PROTOCOL: Rb-86

    E-Print Network [OSTI]

    Farritor, Shane

    of hazardous and/or radioactive wastes are to be followed. Rb- 86 waste should be segregated from all otherSafe Operating Procedure (2/10) SAFETY PROTOCOL: Rb-86 this safety protocol or submit an alternative and equivalent procedure that you develop to meet your unique

  19. Safe Operating Procedure (Reviewed 7/09)

    E-Print Network [OSTI]

    Farritor, Shane

    through ingestion is 10 mCi. Waste Disposal EHS procedures for disposal of hazardous and/or radioactiveSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: Se-75://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

  20. Safe Operating Procedure (Reviewed 7/09)

    E-Print Network [OSTI]

    Farritor, Shane

    of intake through ingestion is 0.8 mCi. Waste Disposal EHS procedures for disposal of hazardous andSafe Operating Procedure (Reviewed 7/09) SAFETY PROTOCOL: Fe-59://ehs.unl.edu/) Use of radioactive materials requires a safety protocol be submitted to the UNL Radiation Safety

  1. Planning and Preparedness for Operational Emergencies

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1991-04-30T23:59:59.000Z

    To establish requirements for planning and prepardness for Operational Emergencies involving the Department of Energy (DOE) or requiring DOE assistance. Cancels DOE O 5500.3. Chg 1 dated Change 1 2-27-92. canceled by DOE O 151.1 of 9-25-1995.

  2. Finance, IT Operations & Information Security Dear Colleagues,

    E-Print Network [OSTI]

    1 Finance, IT Operations & Information Security Dear Colleagues, It is hard not to be mindful with the guidance of their senior administrators. The re-organization in some of the finance offices continues the intranet site. #12;2 Harry Dumay, PhD MBA Chief Financial Officer/ Associate Dean for Finance

  3. ARTICLE IN PRESS Computers & Operations Research ( )

    E-Print Network [OSTI]

    of a corrosive operating environment, the Coast Guard has planned an extensive preventative maintenance helicopter for its medium-range missions up to 300 nautical miles offshore. The search and rescue mission, property damage or loss by rendering aid to persons in distress and property in the maritime environment

  4. Steady-state inductive spheromak operation

    DOE Patents [OSTI]

    Janos, Alan C. (E. Windsor, NJ); Jardin, Stephen C. (Princeton, NJ); Yamada, Masaaki (Lawrenceville, NJ)

    1987-01-01T23:59:59.000Z

    The inductively formed spheromak plasma can be maintained in a highly stable and controlled fashion. Steady-state operation is obtained by forming the plasma in the linked mode, then oscillating the poloidal and toroidal fields such that they have different phases. Preferably, the poloidal and magnetic fields are 90.degree. out of phase.

  5. Clean positive operator valued measures Francesco Buscemia

    E-Print Network [OSTI]

    D'Ariano, Giacomo Mauro

    Clean positive operator valued measures Francesco Buscemia and Michael Keylb Dipartimento di Fisica Fisica "A. Volta," QUIT Group, via Bassi 6, I-27100 Pavia, Italy, and Department of Electrical di Fisica della Materia, QUIT Group, UnitĂ  di Pavia, Dipartimento di Fisica "A. Volta," via Bassi 6

  6. High Power Target Design and Operational Considerations

    E-Print Network [OSTI]

    McDonald, Kirk

    remote handling is a major driving requirement). #12;3 Managed by UT-Battelle for the U.S. Department Issues · Steady state power handling. ­ Cooling of target/enclosure window ­ wettability. ­ Hot spots systems: ­ Mercury loop operation. ­ Remote handling. · Nuclear data. #12;4 Managed by UT

  7. Safe Operating Procedure (Created 5/11)

    E-Print Network [OSTI]

    Farritor, Shane

    ://ehs.unl.edu (5/11) LOCKOUT/TAGOUT FOR MACHINES & EQUIPMENT: WRITTEN PROCEDURES during maintenance and repair operations. In these situations, a lockout/tagout (LO/TO) program must/TO procedures, as well as other program requirements. See EHS SOP, Lockout/Tagout for Machines & Equipment

  8. Reducing Emissions in Plant Flaring Operations

    E-Print Network [OSTI]

    Duck, B.

    2011-01-01T23:59:59.000Z

    and Water Saving Management which was applied to all operating equipment in the 13 company owned oil and gas fields, the 22 refineries and 3 pipeline companies. The plan for the refineries focused on key areas such as improving energy efficiency, utilizing...

  9. Operating Experience Level 3, Explosives Safety

    Broader source: Energy.gov [DOE]

    This Operating Experience Level 3 (OE-3) document provides information about the dangers inherent in material handling and the role hazard analysis, work planning, and walkdowns can play in preventing injuries during heavy equipment moves. More than 200 material handling events reported to the Occurrence Reporting and Processing System (ORPS) from January 1, 2010, through August 31, 2014.

  10. Operating Instructions CASSEHE PUMP DRIVE UNIT

    E-Print Network [OSTI]

    Kleinfeld, David

    4 · Operating Instructions CASSEHE® PUMP DRIVE UNIT Catalog No. 72-510-000 72-510-220 PUMPING The squeezing action of rollers on tubing causes the peristaltic pumping action. The flow is proportionate to the speied of the rollers and the inside diameter of the tubing, both of which can be varied. Pumping

  11. Masters in War Studies Politics, Strategy & Operations

    E-Print Network [OSTI]

    Glasgow, University of

    Masters in War Studies Politics, Strategy & Operations www.glasgow.ac.uk/warstudies #12;MLitt in War Studies The MLitt in War Studies aims to challenge, educate and engage students by exposing you to a wide range of different ideas about war in all its aspects. Core course: Theory & Reality in Western

  12. Evaluating operating system vulnerability to memory errors.

    SciTech Connect (OSTI)

    Ferreira, Kurt Brian; Bridges, Patrick G. (University of New Mexico); Pedretti, Kevin Thomas Tauke; Mueller, Frank (North Carolina State University); Fiala, David (North Carolina State University); Brightwell, Ronald Brian

    2012-05-01T23:59:59.000Z

    Reliability is of great concern to the scalability of extreme-scale systems. Of particular concern are soft errors in main memory, which are a leading cause of failures on current systems and are predicted to be the leading cause on future systems. While great effort has gone into designing algorithms and applications that can continue to make progress in the presence of these errors without restarting, the most critical software running on a node, the operating system (OS), is currently left relatively unprotected. OS resiliency is of particular importance because, though this software typically represents a small footprint of a compute node's physical memory, recent studies show more memory errors in this region of memory than the remainder of the system. In this paper, we investigate the soft error vulnerability of two operating systems used in current and future high-performance computing systems: Kitten, the lightweight kernel developed at Sandia National Laboratories, and CLE, a high-performance Linux-based operating system developed by Cray. For each of these platforms, we outline major structures and subsystems that are vulnerable to soft errors and describe methods that could be used to reconstruct damaged state. Our results show the Kitten lightweight operating system may be an easier target to harden against memory errors due to its smaller memory footprint, largely deterministic state, and simpler system structure.

  13. Occurrence Reporting and Processing of Operations Information

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-07-21T23:59:59.000Z

    To establish and maintain a system for reporting operations information related to DOE-owned and -leased facilities and processing that information to identify the root causes of Unusual, Off-Normal, and Emergency Occurrences and provide for appropriate corrective action. Cancels: DOE O 232.1

  14. Electronic Position Sensor for Power Operated Accessory

    DOE Patents [OSTI]

    Haag, Ronald H.; Chia, Michael I.

    2005-05-31T23:59:59.000Z

    An electronic position sensor for use with a power operated vehicle accessory, such as a power liftgate. The position sensor includes an elongated resistive circuit that is mounted such that it is stationary and extends along the path of a track portion of the power operated accessory. The position sensor further includes a contact nub mounted to a link member that moves within the track portion such that the contact nub is slidingly biased against the elongated circuit. As the link member moves under the force of a motor-driven output gear, the contact nub slides along the surface of the resistive circuit, thereby affecting the overall resistance of the circuit. The position sensor uses the overall resistance to provide an electronic position signal to an ECU, wherein the signal is indicative of the absolute position of the power operated accessory. Accordingly, the electronic position sensor is capable of providing an electronic signal that enables the ECU to track the absolute position of the power operated accessory.

  15. On the Automatic Construction of Indistinguishable Operations

    E-Print Network [OSTI]

    their computational and storage capacity; due to their low unit cost and small size, such devices are sig- nificantly of algorithms which are sensitive to the demands of the platform. Coupled with these issues of efficiency, which frequency of any operation since both eat into the valuable battery life of the device. Perhaps the most

  16. Accelerator/Experiment operations - FY 2004

    SciTech Connect (OSTI)

    Bromberg, C.; Conrad, J.; Denisov, D.; Holmes, S.; Louis, W.; Meyer, A.; Moore, Craig D.; Raja, R.; Ramberg, E.; Roser, R.; /Fermilab

    2004-12-01T23:59:59.000Z

    This Technical Memorandum (TM) summarizes the accelerator and experiment operations for FY 2004. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2004 Run II at the Tevatron Collider, the MiniBooNE neutrino experiment, and SY 120 activities.

  17. Spectral asymptotics for coupled Dirac operators

    E-Print Network [OSTI]

    Savale, Nikhil, Jr. (Nikhil A.)

    2012-01-01T23:59:59.000Z

    In this thesis, we study the problem of asymptotic spectral flow for a family of coupled Dirac operators. We prove that the leading order term in the spectral flow on an n dimensional manifold is of order r n+1/2 followed ...

  18. PHYSICAL PLANT OPERATING POLICY AND PROCEDURE

    E-Print Network [OSTI]

    Gelfond, Michael

    in this technology. REVIEW This Physical Plant Operating Policy/Procedure (PP/OP) will be reviewed in March of each Plant. Physical Plant's intention is to provide each employee reasonable access to the technology Plant technology will be a prime consideration. Requests for non-standard products will not be approved

  19. Certifications http://OperationsExcellence.utk.edu

    E-Print Network [OSTI]

    Grissino-Mayer, Henri D.

    Certifications http://OperationsExcellence.utk.edu Green, Black, Lean Six Sigma, and Master Black) Lean (one week of coursework) 2) Lean Six Sigma (two weeks of coursework) 3) Six Sigma (two weeks) lean Six Sigma Green Belt coursework: Location: Knoxville, Tennessee Tuition: $4,500 (5 days) or $3

  20. Stably operating pulse combustor and method

    DOE Patents [OSTI]

    Zinn, Ben T. (Atlanta, GA); Reiner, David (Haifa, IL)

    1990-01-01T23:59:59.000Z

    A pulse combustor apparatus adapted to burn either a liquid fuel or a pulverized solid fuel within a preselected volume of the combustion chamber. The combustion process is substantially restricted to an optimum combustion zone in order to attain effective pulse combustion operation.