National Library of Energy BETA

Sample records for operating idle downstream

  1. IDL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IDL IDL Description and Overview IDL's primary use is in the analysis and display of scientific data through its programming, plotting, and image display facilities. Features * 2-D Plotting & Contouring * Surface Plotting & 3-D Graphics * Graphic Effects * Color Systems * Curve & Surface Fitting * Image and Signal Processing * Eigensystems * Linear Systems * Sparse Linear Systems * Nonlinear Systems and Root Finding * Multi-Dimensional Optimization * Special & Transcendental

  2. New Truck Stop Electrification Station Maps Help Truckers Reduce Idling -

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    News Releases | NREL New Truck Stop Electrification Station Maps Help Truckers Reduce Idling April 21, 2006 Golden, Colo. - A new internet-based mapping program is helping truckers find truck stops with idle reduction facilities-on-site systems that can substantially cut fuel use while reducing air emissions. Idle reduction systems hold great promise for the approximately 500,000 long-haul trucks with sleeper cabs currently operating in the United States. Estimates show idle reduction

  3. Sluiceway Operations for Adult Steelhead Downstream Passage at The Dalles Dam, Columbia River, USA

    SciTech Connect (OSTI)

    Khan, Fenton; Royer, Ida M.; Johnson, Gary E.; Tackley, Sean C.

    2013-10-01

    This study evaluated adult steelhead (Oncorhynchus mykiss; fallbacks and kelts) downstream passage at The Dalles Dam in the Columbia River, USA, during the late fall, winter, and early spring months between 2008 and 2011. The purpose of the study was to determine the efficacy of operating the dam’s ice-and-trash sluiceway during non-spill months to provide a relatively safe, non-turbine, surface outlet for overwintering steelhead fallbacks and downstream migrating steelhead kelts. We applied the fixed-location hydroacoustic technique to estimate fish passage rates at the sluiceway and turbines of the dam. The spillway was closed during our sampling periods, which generally occurred in late fall, winter, and early spring. The sluiceway was highly used by adult steelhead (91–99% of total fish sampled passing the dam) during all sampling periods. Turbine passage was low when the sluiceway was not operated. This implies that lack of a sluiceway route did not result in increased turbine passage. However, when the sluiceway was open, adult steelhead used it to pass through the dam. The sluiceway may be operated during late fall, winter, and early spring to provide an optimal, non-turbine route for adult steelhead (fallbacks and kelts) downstream passage at The Dalles Dam.

  4. National Idling Reduction Network News- May 2012

    Broader source: Energy.gov [DOE]

    Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

  5. National Idling Reduction Network News- December 2011

    Office of Energy Efficiency and Renewable Energy (EERE)

    Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

  6. National Idling Reduction Network News- September 2013

    Broader source: Energy.gov [DOE]

    Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

  7. National Idling Reduction Network News- August 2011

    Broader source: Energy.gov [DOE]

    Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

  8. National Idling Reduction Network News- December 2009

    Broader source: Energy.gov [DOE]

    Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

  9. National Idling Reduction Network News- November 2013

    Broader source: Energy.gov [DOE]

    Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

  10. National Idling Reduction Network News- June 2010

    Broader source: Energy.gov [DOE]

    Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

  11. National Idling Reduction Network News- September 2011

    Broader source: Energy.gov [DOE]

    Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

  12. National Idling Reduction Network News- September 2009

    Broader source: Energy.gov [DOE]

    Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

  13. National Idling Reduction Network News- June 2012

    Broader source: Energy.gov [DOE]

    Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

  14. National Idling Reduction Network News- February 2014

    Broader source: Energy.gov [DOE]

    Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

  15. National Idling Reduction Network News- June 2013

    Broader source: Energy.gov [DOE]

    Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

  16. National Idling Reduction Network News- August 2009

    Office of Energy Efficiency and Renewable Energy (EERE)

    Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

  17. National Idling Reduction Network News- June 2009

    Office of Energy Efficiency and Renewable Energy (EERE)

    Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events.

  18. ,"U.S. Downstream Charge Capacity of Operable Petroleum Refineries"

    U.S. Energy Information Administration (EIA) Indexed Site

    Charge Capacity of Operable Petroleum Refineries" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","U.S. Downstream Charge Capacity of Operable Petroleum Refineries",32,"Annual",2015,"6/30/1982" ,"Release Date:","6/19/2015" ,"Next Release Date:","6/30/2016"

  19. Idling - cruising the fuel inefficiency highway.

    SciTech Connect (OSTI)

    Gaines, L.; Levinson, T.

    2011-06-30

    What is the purpose of idling? The scale of idling can be small, as when parents idle their vehicles while waiting for their children outside of school, or it can be large, as when ocean liners are in port. In many cases, the primary purpose for idling is to control the temperature of a passenger or freight compartment. Large line-haul trucks idle overnight to keep fuel and the engine warm, for the resting driver's comfort, to mask out noises and smells, and for safety. In addition, all classes of trucks idle during the workday at ports and terminals, busy delivery sites, border crossings, and other work sites. They may be idling to enable slow movement in a queue (creep idling) or to provide other services. Bus drivers also idle their vehicles while they wait for passengers and to warm up in the morning. Even locomotive engines are idled so they start, for hotel load, to keep the battery charged, to keep the toilet water from freezing, and for air brakes, or because the operator idles out of habit. Although this document focuses on long-haul trucks, much of the information applies to other vehicles as well. The impacts of idling are substantial, with as much as 6 billion gallons of fuel burned unnecessarily each year in the United States at a cost of over $20 billion. The extra hours of engine operation also cost the owners money for more frequent maintenance and overhauls. In addition, idling vehicles emit particulates (PM{sub 10}), nitrogen dioxide (NO{sub 2}), carbon monoxide (CO), and carbon dioxide (CO{sub 2}). These emissions, along with noise from idling vehicles, have led to many local and state restrictions on idling. Two main factors have combined to create a surge of interest in idling reduction (IR): (1) Increasing restrictions on idling for heavy vehicles and (2) The price of diesel fuel. Because stakeholders focus their efforts on improving different factors (air quality, fuel economy, noise level), they do not necessarily agree on the most advantageous technological alternatives to implement. In addition, although many equipment manufacturers have tried to educate customers and government agencies, they often provide conflicting claims about the comparative merits of different devices. This makes it difficult for truck owners to choose the right equipment for their needs. In this study, we present the first comparison of IR technologies with each other and with idling on the basis of both costs and full fuel-cycle emissions, for different locations, fuel prices, and idling patterns. The preferences described are for the technologies that reduce total emissions the most and cost truck owners the least. We also discuss how regulatory issues and legislation affect IR, what financial incentives help to promote IR, and how outreach and education approaches can be adopted to reduce the need to idle. Finally, we offer a prediction of how future research and development (R&D), regulations, and citizen involvement can help to improve fuel economy and clean the air.

  20. Fact #787: July 8, 2013 Truck Stop Electrification Reduces Idle...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    heating, cooling and use of electrical appliances. Electrification at truck stops allows truckers to "plug-in" vehicles to operate the necessary systems without idling the engine. ...

  1. Idling Reduction for Personal Vehicles

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    - Idling Reduction for Personal Vehicles Idling your vehicle-running your engine when you're not driving it-truly gets you nowhere. Idling reduces your vehicle's fuel economy, costs you money, and creates pollution. Idling for more than 10 seconds uses more fuel and produces more emissions that contribute to smog and climate change than stopping and restarting your engine does. Researchers estimate that idling from heavy-duty and light- duty vehicles combined wastes about 6 billion gallons of

  2. Performance of ESPs operating downstream from spray-drying desulphurisation units

    SciTech Connect (OSTI)

    Ollero, P.; Canadas, L.; Salvador, L.

    1995-06-01

    This paper summarizes data from a Spray Dryer/ESP pilot plant located at the Los Barrios Coal Power Plant (Cadiz, Spain). A series of tests has been conducted to evaluate the performance of an existing ESP operating downstream from a spray dryer in a retrofit application. A factorial design of experiments with two SO{sub 2} levels, two flyash load levels, three Ca/S ratios and three sulfur removal efficiencies, was run during a six-month experimental programme. A global and a field-by-field analysis of the performance of the pilot ESP has shown that the desulphurisation unit enhances ESP efficiency and reduces the emission level. No evidence of electrical dust reentrainment has been found.

  3. Vehicle Technologies Office: National Idling Reduction Network...

    Office of Environmental Management (EM)

    Idling Reduction Network News Archives Vehicle Technologies Office: National Idling Reduction Network News Archives The National Idling Reduction Network brings together trucking...

  4. Idling Reduction for Personal Vehicles

    SciTech Connect (OSTI)

    2015-05-07

    Fact sheet on reducing engine idling in personal vehicles. Idling your vehicle--running your engine when you're not driving it--truly gets you nowhere. Idling reduces your vehicle's fuel economy, costs you money, and creates pollution. Idling for more than 10 seconds uses more fuel and produces more emissions that contribute to smog and climate change than stopping and restarting your engine does.

  5. Alternative Fuels Data Center: Idle Reduction

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Idle Reduction to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction on Google Bookmark Alternative Fuels Data Center: Idle Reduction on Delicious Rank Alternative Fuels Data Center: Idle Reduction on Digg Find More places to share Alternative Fuels Data Center: Idle Reduction on AddThis.com... More in this section... Idle Reduction Benefits

  6. Locomotive Emission and Engine Idle Reduction Technology Demonstration Project

    SciTech Connect (OSTI)

    John R. Archer

    2005-03-14

    In response to a United States Department of Energy (DOE) solicitation, the Maryland Energy Administration (MEA), in partnership with CSX Transportation, Inc. (CSXT), submitted a proposal to DOE to support the demonstration of Auxiliary Power Unit (APU) technology on fifty-six CSXT locomotives. The project purpose was to demonstrate the idle fuel savings, the Nitrous Oxide (NOX) emissions reduction and the noise reduction capabilities of the APU. Fifty-six CSXT Baltimore Division locomotives were equipped with APUs, Engine Run Managers (ERM) and communications equipment to permit GPS tracking and data collection from the locomotives. Throughout the report there is mention of the percent time spent in the State of Maryland. The fifty-six locomotives spent most of their time inside the borders of Maryland and some spent all their time inside the state borders. Usually when a locomotive traveled beyond the Maryland State border it was into an adjoining state. They were divided into four groups according to assignment: (1) Power Unit/Switcher Mate units, (2) Remote Control units, (3) SD50 Pusher units and (4) Other units. The primary data of interest were idle data plus the status of the locomotive--stationary or moving. Also collected were main engine off, idling or working. Idle data were collected by county location, by locomotive status (stationary or moving) and type of idle (Idle 1, main engine idling, APU off; Idle 2, main engine off, APU on; Idle 3, main engine off, APU off; Idle 4, main engine idle, APU on). Desirable main engine idle states are main engine off and APU off or main engine off and APU on. Measuring the time the main engine spends in these desirable states versus the total time it could spend in an engine idling state allows the calculation of Percent Idle Management Effectiveness (%IME). IME is the result of the operation of the APU plus the implementation of CSXT's Warm Weather Shutdown Policy. It is difficult to separate the two. The units demonstrated an IME of 64% at stationary idle for the test period. The data collected during calendar year 2004 demonstrated that 707,600 gallons of fuel were saved and 285 tons of NOX were not emitted as a result of idle management in stationary idle, which translates to 12,636 gallons and 5.1 tons of NOx per unit respectively. The noise reduction capabilities of the APU demonstrated that at 150 feet from the locomotive the loaded APU with the main engine shut down generated noise that was only marginally above ambient noise level.

  7. Economic Analysis of Commercial Idling Reduction Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Economic Analysis of Commercial Idling Reduction Technologies: Which idling reduction ... A Key Enabler of Expanded U.S. Trade and Economic Growth Comparing Emissions Benefits from ...

  8. Diesel Idling Reduction | Open Energy Information

    Open Energy Info (EERE)

    Idling Reduction Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Diesel Idling Reduction AgencyCompany Organization: US EPA, NY SERDA Focus Area: Fuels & Efficiency...

  9. Driving/Idling Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    vehicle miles traveled. Find drivingidling resources below. Alternative Fuels Data Center: Idle Reduction Alternative Fuels Data Center: Idle Reduction Requirements. Back to ...

  10. "Idle Free Systems" Does Not Stand Idly by | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    "Idle Free Systems" Does Not Stand Idly by "Idle Free Systems" Does Not Stand Idly by March 12, 2012 - 6:50pm Addthis Idle Free System's frame rail unit mounted onto the chassis rail of a truck. Idle Free produces battery-powered, idle-elimination systems that lower fuel costs and CO2 emissions while retaining power to a truck’s cab. | Courtesy of Idle Free Systems. Idle Free System's frame rail unit mounted onto the chassis rail of a truck. Idle Free produces

  11. Caterpillar MorElectric DOE Idle Reduction Demonstration Program

    SciTech Connect (OSTI)

    John Bernardi

    2007-09-30

    This project titled 'Demonstration of the New MorElectric{trademark} Technology as an Idle Reduction Solution' is one of four demonstration projects awarded by the US Department of Energy in 2002. The goal of these demonstration and evaluation projects was to gather objective in-use information on the performance of available idle reduction technologies by characterizing the cost; fuel, maintenance, and engine life savings; payback; and user impressions of various systems and techniques. In brief, the Caterpillar Inc. project involved applying electrically driven accessories for cab comfort during engine-off stops and for reducing fuel consumption during on-highway operation. Caterpillar had equipped and operated five new trucks with the technology in conjunction with International Truck and Engine Corporation and COX Transfer. The most significant result of the project was a demonstrated average idle reduction of 13.8% for the 5 truck MEI fleet over the control fleet. It should be noted that the control fleet trucks were also equipped with an idle reduction device that would start and stop the main engine automatically in order to maintain cab temperature. The control fleet idle usage would have been reduced by 3858 hours over the 2 year period with the MEI system installed, or approximately 2315 gallons of fuel less (calculations assume a fuel consumption of 0.6 gallons per hour for the 13 liter engine at idle). The fuel saved will be significantly larger for higher displacement engines without idle reduction equipment such as the engine auto start/stop device used by COX Transfer. It is common for engines to consume 1.0 gallons per hour which would increase the fuel savings to approximately 1260 gallons per truck per year of typical idling (1800 hours idle/yr).

  12. National Idling Reduction Network News - November 2009 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 09 National Idling Reduction Network News - November 2009 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon nov09_network_news.pdf More Documents & Publications National Idling Reduction Network News - January 2009 National Idling Reduction Network News - October

  13. National Idling Reduction Network News - November 2010 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 10 National Idling Reduction Network News - November 2010 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon nov10_network_news.pdf More Documents & Publications National Idling Reduction Network News - January 2011 National Idling Reduction Network News - January

  14. National Idling Reduction Network News Compendium | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Compendium National Idling Reduction Network News Compendium Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon idling_newsletter_portfolio.pdf More Documents & Publications National Idling Reduction Network News - January 2014 National Idling Reduction Network News - June 2012 National Idling Reduction Network News - December 2013

  15. Idling is Not the Way to Go

    SciTech Connect (OSTI)

    2013-06-01

    Researchers estimate that idling from heavy-duty and light-duty vehicles combined wastes about 6 billion gallons of fuel annually. Many states have put restrictions on idling, especially in metropolitan areas. Clearly, idling is not the way to go.

  16. National Idling Reduction Network News - April 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 National Idling Reduction Network News - April 2010 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon apr10_network_news.pdf More Documents & Publications National Idling Reduction Network News - July 2010 National Idling Reduction Network News - May 2010 National Idling Reduction Network News - October 2009

  17. National Idling Reduction Network News - April 2011 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 National Idling Reduction Network News - April 2011 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon apr11_network_news.pdf More Documents & Publications National Idling Reduction Network News - August 2012 National Idling Reduction Network News - January 2013 National Idling Reduction Network News - June

  18. National Idling Reduction Network News - April 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 National Idling Reduction Network News - April 2012 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon apr12_network_news.pdf More Documents & Publications National Idling Reduction Network News - February 2012 National Idling Reduction Network News - March 2012 National Idling Reduction Network News - October

  19. National Idling Reduction Network News - April 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 National Idling Reduction Network News - April 2013 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon apr13_network_news.pdf More Documents & Publications National Idling Reduction Network News - October 2012 National Idling Reduction Network News - March 2014 National Idling Reduction Network News Compendium

  20. National Idling Reduction Network News - April 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 National Idling Reduction Network News - April 2014 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon apr14_network_news.pdf More Documents & Publications National Idling Reduction Network News Compendium National Idling Reduction Network News - January 2014 National Idling Reduction Network News - December 2013

  1. National Idling Reduction Network News - August 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 National Idling Reduction Network News - August 2010 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon aug10_network_news.pdf More Documents & Publications National Idling Reduction Network News - February 2011 National Idling Reduction Network News - May 2010 National Idling Reduction Network News - August

  2. National Idling Reduction Network News - August 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 National Idling Reduction Network News - August 2012 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon aug12_network_news.pdf More Documents & Publications National Idling Reduction Network News - January 2013 National Idling Reduction Network News - March 2012 National Idling Reduction Network News - June 2012

  3. National Idling Reduction Network News - August 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 National Idling Reduction Network News - August 2013 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon aug13_network_news.pdf More Documents & Publications National Idling Reduction Network News - October 2013 National Idling Reduction Network News - January 2013 National Idling Reduction Network News - August 2011

  4. National Idling Reduction Network News - December 2010 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 0 National Idling Reduction Network News - December 2010 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon dec10_network_news.pdf More Documents & Publications National Idling Reduction Network News - August 2011 National Idling Reduction Network News - May 2010 National Idling Reduction Network News - January 2013

  5. National Idling Reduction Network News - December 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 2 National Idling Reduction Network News - December 2012 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon dec12_network_news.pdf More Documents & Publications National Idling Reduction Network News - June 2011 National Idling Reduction Network News - April 2011 National Idling Reduction Network News - July 2010

  6. National Idling Reduction Network News - December 2013 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 3 National Idling Reduction Network News - December 2013 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon dec13_network_news.pdf More Documents & Publications National Idling Reduction Network News - June 2012 National Idling Reduction Network News Compendium National Idling Reduction Network News - March 2014

  7. National Idling Reduction Network News - Early Spring 2009 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Early Spring 2009 National Idling Reduction Network News - Early Spring 2009 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon early_spring09_network_news.pdf More Documents & Publications National Idling Reduction Network News - January 2009 National Idling Reduction Network News - August 2009 National Idling Reduction Network News

  8. National Idling Reduction Network News - February 2010 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 0 National Idling Reduction Network News - February 2010 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon feb10_network_news.pdf More Documents & Publications National Idling Reduction Network News - March 2012 National Idling Reduction Network News - May 2010 National Idling Reduction Network News - July 2010

  9. National Idling Reduction Network News - February 2011 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 1 National Idling Reduction Network News - February 2011 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon feb11_network_news.pdf More Documents & Publications National Idling Reduction Network News - January 2011 National Idling Reduction Network News - November 2010 National Idling Reduction Network News - December 2011

  10. National Idling Reduction Network News - February 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 2 National Idling Reduction Network News - February 2012 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon feb12_network_news.pdf More Documents & Publications National Idling Reduction Network News - August 2011 National Idling Reduction Network News - November 2011 National Idling Reduction Network News - March 2012

  11. National Idling Reduction Network News - February 2013 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 3 National Idling Reduction Network News - February 2013 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon feb13_network_news.pdf More Documents & Publications National Idling Reduction Network News - October 2013 National Idling Reduction Network News - April 2011 National Idling Reduction Network News Compendium

  12. National Idling Reduction Network News - January 2009 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 09 National Idling Reduction Network News - January 2009 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon jan09_network_news.pdf More Documents & Publications National Idling Reduction Network News - Early Spring 2009 National Idling Reduction Network News - October 2009 National Idling Reduction Network News - September 2009

  13. National Idling Reduction Network News - January 2010 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 0 National Idling Reduction Network News - January 2010 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon jan10_network_news.pdf More Documents & Publications National Idling Reduction Network News - February 2012 National Idling Reduction Network News - September 2010 National Idling Reduction Network News - March

  14. National Idling Reduction Network News - January 2011 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 1 National Idling Reduction Network News - January 2011 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon jan11_network_news.pdf More Documents & Publications National Idling Reduction Network News - February 2011 National Idling Reduction Network News - June 2011 National Idling Reduction Network News - August

  15. National Idling Reduction Network News - January 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 2 National Idling Reduction Network News - January 2012 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon jan12_network_news.pdf More Documents & Publications National Idling Reduction Network News - May 2012 National Idling Reduction Network News - July 2011 National Idling Reduction Network News - February

  16. National Idling Reduction Network News - January 2013 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 3 National Idling Reduction Network News - January 2013 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon jan13_network_news.pdf More Documents & Publications National Idling Reduction Network News - February 2013 National Idling Reduction Network News - March 2013 National Idling Reduction Network News - August

  17. National Idling Reduction Network News - January 2014 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 4 National Idling Reduction Network News - January 2014 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon jan14_network_news.pdf More Documents & Publications National Idling Reduction Network News Compendium National Idling Reduction Network News - June 2012 National Idling Reduction Network News - January 2009

  18. National Idling Reduction Network News - July 2009 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    09 National Idling Reduction Network News - July 2009 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon july09_network_news.pdf More Documents & Publications National Idling Reduction Network News - May 2012 National Idling Reduction Network News - June 2011 National Idling Reduction Network News - November

  19. National Idling Reduction Network News - July 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 National Idling Reduction Network News - July 2010 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon july10_network_news.pdf More Documents & Publications National Idling Reduction Network News - Early Spring 2009 National Idling Reduction Network News - June 2010 National Idling Reduction Network News - June

  20. National Idling Reduction Network News - July 2011 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 National Idling Reduction Network News - July 2011 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon july11_network_news.pdf More Documents & Publications National Idling Reduction Network News - June 2011 National Idling Reduction Network News - September 2009 National Idling Reduction Network News - April

  1. National Idling Reduction Network News - July 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 National Idling Reduction Network News - July 2012 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon july12_network_news.pdf More Documents & Publications National Idling Reduction Network News - March 2011 National Idling Reduction Network News - May 2012 National Idling Reduction Network News - October 2012

  2. National Idling Reduction Network News - July 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 National Idling Reduction Network News - July 2013 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon july13_network_news.pdf More Documents & Publications National Idling Reduction Network News - September 2012 National Idling Reduction Network News - June 2013 National Idling Reduction Network News - September 2013

  3. National Idling Reduction Network News - June 2011 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 National Idling Reduction Network News - June 2011 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon june11_network_news.pdf More Documents & Publications National Idling Reduction Network News - November 2011 National Idling Reduction Network News - October 2011 National Idling Reduction Network News - September 2012

  4. National Idling Reduction Network News - March 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 National Idling Reduction Network News - March 2010 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon mar10_network_news.pdf More Documents & Publications National Idling Reduction Network News - July 2010 National Idling Reduction Network News - Early Spring 2009 National Idling Reduction Network News - May 2010

  5. National Idling Reduction Network News - March 2011 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 National Idling Reduction Network News - March 2011 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon mar11_network_news.pdf More Documents & Publications National Idling Reduction Network News - August 2011 National Idling Reduction Network News - June 2011 National Idling Reduction Network News - January 2011

  6. National Idling Reduction Network News - March 2012 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 National Idling Reduction Network News - March 2012 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon mar12_network_news.pdf More Documents & Publications National Idling Reduction Network News Compendium National Idling Reduction Network News - May 2012 National Idling Reduction Network News - January 2013

  7. National Idling Reduction Network News - March 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 National Idling Reduction Network News - March 2013 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon mar13_network_news.pdf More Documents & Publications National Idling Reduction Network News - August 2011 National Idling Reduction Network News - March 2012 National Idling Reduction Network News - June 2011

  8. National Idling Reduction Network News - March 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 National Idling Reduction Network News - March 2014 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon mar14_network_news.pdf More Documents & Publications National Idling Reduction Network News - December 2013 National Idling Reduction Network News Compendium National Idling Reduction Network News - June 2012

  9. National Idling Reduction Network News - May 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 National Idling Reduction Network News - May 2010 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon may10_network_news.pdf More Documents & Publications National Idling Reduction Network News - August 2011 National Idling Reduction Network News - December 2010 National Idling Reduction Network News - January 2013

  10. National Idling Reduction Network News - May 2011 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 National Idling Reduction Network News - May 2011 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon may11_network_news.pdf More Documents & Publications National Idling Reduction Network News - October 2011 National Idling Reduction Network News - March 2012 National Idling Reduction Network News - February 2011

  11. National Idling Reduction Network News - May 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 National Idling Reduction Network News - May 2013 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon may13_network_news.pdf More Documents & Publications National Idling Reduction Network News - November 2012 National Idling Reduction Network News - November 2011 National Idling Reduction Network News - April 2013

  12. National Idling Reduction Network News - November 2011 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 1 National Idling Reduction Network News - November 2011 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon nov11_network_news.pdf More Documents & Publications National Idling Reduction Network News - August 2011 National Idling Reduction Network News - December 2010 National Idling Reduction Network News - August 2010

  13. National Idling Reduction Network News - November 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 2 National Idling Reduction Network News - November 2012 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon nov12_network_news.pdf More Documents & Publications National Idling Reduction Network News - June 2011 National Idling Reduction Network News - May 2012 National Idling Reduction Network News - Early Spring 2009

  14. National Idling Reduction Network News - October 2009 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 09 National Idling Reduction Network News - October 2009 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon oct09_network_news.pdf More Documents & Publications National Idling Reduction Network News - January 2009 National Idling Reduction Network News - November 2009 National Idling Reduction Network News - August

  15. National Idling Reduction Network News - October 2010 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 10 National Idling Reduction Network News - October 2010 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon oct10_network_news.pdf More Documents & Publications National Idling Reduction Network News - July 2010 National Idling Reduction Network News - May 2010 National Idling Reduction Network News - October

  16. National Idling Reduction Network News - October 2011 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 1 National Idling Reduction Network News - October 2011 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon oct11_network_news.pdf More Documents & Publications National Idling Reduction Network News - May 2011 National Idling Reduction Network News - November 2011 National Idling Reduction Network News - August 2011

  17. National Idling Reduction Network News - October 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 2 National Idling Reduction Network News - October 2012 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon oct12_network_news.pdf More Documents & Publications National Idling Reduction Network News - Early Spring 2009 National Idling Reduction Network News - June 2011 National Idling Reduction Network News - June 2009

  18. National Idling Reduction Network News - October 2013 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 3 National Idling Reduction Network News - October 2013 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon oct13_network_news.pdf More Documents & Publications National Idling Reduction Network News - February 2013 National Idling Reduction Network News - March 2013 National Idling Reduction Network News - May 2010

  19. National Idling Reduction Network News - September 2010 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 0 National Idling Reduction Network News - September 2010 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon sep10_network_news.pdf More Documents & Publications National Idling Reduction Network News - August 2010 National Idling Reduction Network News - May 2010 National Idling Reduction Network News - August 2011

  20. National Idling Reduction Network News - September 2012 | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 2 National Idling Reduction Network News - September 2012 Newsletter with information on idling reduction regulations, idling reduction grants, idling reduction general news, summary of state ani-idling regulations, and upcoming meetings and events. PDF icon sep12_network_news.pdf More Documents & Publications National Idling Reduction Network News - July 2013 National Idling Reduction Network News - February 2012 National Idling Reduction Network News - April

  1. January 2016 National Idling Reduction Network News

    Broader source: Energy.gov [DOE]

    The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators)...

  2. National Idling Reduction Network News - October 2009

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... the school districts it serves of its anti-idling policy. ... Clean Cities Annual Metrics Report http:www.trb.org... information, apparatus, product, or process disclosed, or ...

  3. March 2016 National Idling Reduction Network News

    Broader source: Energy.gov [DOE]

    The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators)...

  4. Evaluating Benefits of Idling Restrictions in a Large Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Evaluating Benefits of Idling Restrictions in a Large Northern City While an anti-idling law in a large northern city has brought about the deployment of anti-idling technologies ...

  5. Vehicle Technologies Office: Idle Reduction | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fuel Efficiency & Emissions » Vehicle Technologies Office: Idle Reduction Vehicle Technologies Office: Idle Reduction Idle reduction, or limiting the amount of time that vehicles idle unnecessarily, can be a key strategy for increasing fuel efficiency and reducing petroleum use. The Vehicle Technologies Office supports research on idle reduction and provides a variety of technical resources to help fleets and individuals reduce idling. Research and Development As part of its broader efforts

  6. Alternative Fuels Data Center: Idle Reduction Benefits and Considerations

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Idle Reduction Benefits and Considerations to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Benefits and Considerations on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Benefits and Considerations on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Benefits and Considerations on Google Bookmark Alternative Fuels Data Center: Idle Reduction Benefits and Considerations on Delicious Rank Alternative Fuels Data Center: Idle Reduction

  7. Alternative Fuels Data Center: Idle Reduction Programs at Tennessee Schools

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Idle Reduction Programs at Tennessee Schools to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Programs at Tennessee Schools on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Programs at Tennessee Schools on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Programs at Tennessee Schools on Google Bookmark Alternative Fuels Data Center: Idle Reduction Programs at Tennessee Schools on Delicious Rank Alternative Fuels Data Center: Idle

  8. Alternative Fuels Data Center: Idle Reduction Research and Development

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Idle Reduction Research and Development to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Research and Development on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Research and Development on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Research and Development on Google Bookmark Alternative Fuels Data Center: Idle Reduction Research and Development on Delicious Rank Alternative Fuels Data Center: Idle Reduction Research and

  9. Alternative Fuels Data Center: School Bus Idle Reduction Strategies

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    School Bus Idle Reduction Strategies to someone by E-mail Share Alternative Fuels Data Center: School Bus Idle Reduction Strategies on Facebook Tweet about Alternative Fuels Data Center: School Bus Idle Reduction Strategies on Twitter Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Strategies on Google Bookmark Alternative Fuels Data Center: School Bus Idle Reduction Strategies on Delicious Rank Alternative Fuels Data Center: School Bus Idle Reduction Strategies on Digg Find

  10. National Idling Reduction Network News - April 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... and anti-idling equipment on 26 school buses 70,228 Zane Trace Local School District (Ross County, Ohio) Ohio EPA Installation of emission control equipment on 8 school buses and ...

  11. National Idling Reduction Network News - January 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... for drivers who are new to truck stop electrification," said IdleAir's Chief Listening Officer, Jeff Maurer. For more information, please go to http:www.idleair.comnews. ...

  12. June 2015 National Idling Reduction Network News

    Broader source: Energy.gov [DOE]

    This is the June 2015 edition of the National Idling Reduction Network News, an e-newsletter that reports solicitations for funding, regulatory changes, awards and recognition, reports and other resources of interest, upcoming meetings and events, and manufacturers’ announcements.

  13. December 2015 National Idling Reduction Network News

    Broader source: Energy.gov [DOE]

    This is the December 2015 edition of the National Idling Reduction Network News, an e-newsletter that reports solicitations for funding, regulatory changes, awards and recognition, reports and other resources of interest, upcoming meetings and events, and manufacturers’ announcements.

  14. National Idling Reduction Network News - April 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Idle-Reduction Strategy http:www.dpna- digital.comdpna201302?subidChgTFLb8We5Lfpg31 ... truck engines," said Alan Bates, vice president of marketing for Shorepower Technologies. ...

  15. December 2014 National Idling Reduction Network News

    Broader source: Energy.gov [DOE]

    This is the December 2014 edition of the National Idling Reduction Network News, an e-newsletter that reports solicitations for funding, regulatory changes, awards and recognition, reports and other resources of interest, upcoming meetings and events, and manufacturers’ announcements.

  16. November 2015 National Idling Reduction Network News

    Broader source: Energy.gov [DOE]

    This is the November 2015 edition of the National Idling Reduction Network News, an e-newsletter that reports solicitations for funding, regulatory changes, awards and recognition, reports and other resources of interest, upcoming meetings and events, and manufacturers’ announcements.

  17. Vehicle Technologies Office: National Idling Reduction Network News |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy National Idling Reduction Network News Vehicle Technologies Office: National Idling Reduction Network News The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to vehicle idling for the entire United States. Below is the most

  18. Vehicle Technologies Office: National Idling Reduction Network News

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Archives | Department of Energy Idling Reduction Network News Archives Vehicle Technologies Office: National Idling Reduction Network News Archives The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United

  19. Alternative Fuels Data Center: Idle Reduction Related Links

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Conserve Fuel Printable Version Share this resource Send a link to Alternative Fuels Data Center: Idle Reduction Related Links to someone by E-mail Share Alternative Fuels Data Center: Idle Reduction Related Links on Facebook Tweet about Alternative Fuels Data Center: Idle Reduction Related Links on Twitter Bookmark Alternative Fuels Data Center: Idle Reduction Related Links on Google Bookmark Alternative Fuels Data Center: Idle Reduction Related Links on Delicious Rank Alternative Fuels Data

  20. Alternative Fuels Data Center: Medium-Duty Vehicle Idle Reduction

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Strategies Medium-Duty Vehicle Idle Reduction Strategies to someone by E-mail Share Alternative Fuels Data Center: Medium-Duty Vehicle Idle Reduction Strategies on Facebook Tweet about Alternative Fuels Data Center: Medium-Duty Vehicle Idle Reduction Strategies on Twitter Bookmark Alternative Fuels Data Center: Medium-Duty Vehicle Idle Reduction Strategies on Google Bookmark Alternative Fuels Data Center: Medium-Duty Vehicle Idle Reduction Strategies on Delicious Rank Alternative Fuels Data

  1. Alternative Fuels Data Center: Onboard Idle Reduction Equipment for

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Heavy-Duty Trucks Onboard Idle Reduction Equipment for Heavy-Duty Trucks to someone by E-mail Share Alternative Fuels Data Center: Onboard Idle Reduction Equipment for Heavy-Duty Trucks on Facebook Tweet about Alternative Fuels Data Center: Onboard Idle Reduction Equipment for Heavy-Duty Trucks on Twitter Bookmark Alternative Fuels Data Center: Onboard Idle Reduction Equipment for Heavy-Duty Trucks on Google Bookmark Alternative Fuels Data Center: Onboard Idle Reduction Equipment for

  2. Alternative Fuels Data Center: Students Reduce Vehicle Idling in San

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Antonio, Texas Students Reduce Vehicle Idling in San Antonio, Texas to someone by E-mail Share Alternative Fuels Data Center: Students Reduce Vehicle Idling in San Antonio, Texas on Facebook Tweet about Alternative Fuels Data Center: Students Reduce Vehicle Idling in San Antonio, Texas on Twitter Bookmark Alternative Fuels Data Center: Students Reduce Vehicle Idling in San Antonio, Texas on Google Bookmark Alternative Fuels Data Center: Students Reduce Vehicle Idling in San Antonio, Texas on

  3. SEP Success Story: "Idle Free Systems" Does Not Stand Idly by

    Broader source: Energy.gov [DOE]

    Wisconsin-based Idle Free Systems received nearly $1.2M from the Energy Department’s State Energy Program to expand production of their idle elimination solutions through the Recovery Act, and expects to create 20 jobs from the investment. Learn more.

  4. Analysis of Technology Options to Reduce the Fuel Consumption of Idling Trucks

    SciTech Connect (OSTI)

    F. Stodolsky; L. Gaines; A. Vyas

    2000-06-01

    Long-haul trucks idling overnight consume more than 838 million gallons (20 million barrels) of fuel annually. Idling also emits pollutants. Truck drivers idle their engines primarily to (1) heat or cool the cab and/or sleeper, (2) keep the fuel warm in winter, and (3) keep the engine warm in the winter so that the engine is easier to start. Alternatives to overnight idling could save much of this fuel, reduce emissions, and cut operating costs. Several fuel-efficient alternatives to idling are available to provide heating and cooling: (1) direct-fired heater for cab/sleeper heating, with or without storage cooling; (2) auxiliary power units; and (3) truck stop electrification. Many of these technologies have drawbacks that limit market acceptance. Options that supply electricity are economically viable for trucks that are idled for 1,000-3,000 or more hours a year, while heater units could be used across the board. Payback times for fleets, which would receive quantity discounts on the prices, would be somewhat shorter.

  5. Which Idling Reduction Technologeis are the Best? | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Diesel Trucks: A Comparison of Full-Fuel-Cycle Emissions, Energy Use, and Proximity to Urban Populations in Five States To Idle or Not to Idle: That is the Question Evaluating...

  6. Fact #627: June 14, 2010 Idle Reduction for Heavy Trucks

    Broader source: Energy.gov [DOE]

    In order to encourage the use of idling reduction devices in large trucks, the Energy Policy Act of 2005 allowed for a 400-pound weight exemption for the additional weight of idling reduction...

  7. February 2015 National Idling Reduction Network News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 National Idling Reduction Network News February 2015 National Idling Reduction Network News April 2, 2015 - 11:35am Addthis The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United States. Below is the

  8. February 2016 National Idling Reduction Network News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 National Idling Reduction Network News February 2016 National Idling Reduction Network News April 5, 2016 - 10:05am Addthis The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United States. Below is the

  9. March 2015 National Idling Reduction Network News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 National Idling Reduction Network News March 2015 National Idling Reduction Network News May 6, 2015 - 10:12am Addthis The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United States. Below is the March 2015

  10. May 2014 National Idling Reduction Network News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 National Idling Reduction Network News May 2014 National Idling Reduction Network News July 17, 2014 - 3:47pm Addthis The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United States. Below is the May 2014

  11. May 2015 National Idling Reduction Network News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 National Idling Reduction Network News May 2015 National Idling Reduction Network News July 2, 2015 - 4:19pm Addthis The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United States. Below is the May 2015

  12. August 2015 National Idling Reduction Network News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2015 National Idling Reduction Network News August 2015 National Idling Reduction Network News October 6, 2015 - 10:26am Addthis The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United States. Below is

  13. August 2014 National Idling Reduction Network News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2014 National Idling Reduction Network News August 2014 National Idling Reduction Network News October 3, 2014 - 12:11pm Addthis The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United States. Below is

  14. October 2014 National Idling Reduction Network News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 National Idling Reduction Network News October 2014 National Idling Reduction Network News December 9, 2014 - 10:39am Addthis The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United States. Below is the

  15. October 2015 National Idling Reduction Network News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 National Idling Reduction Network News October 2015 National Idling Reduction Network News December 4, 2015 - 7:53pm Addthis The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United States. Below is the

  16. April 2015 National Idling Reduction Network News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    April 2015 National Idling Reduction Network News April 2015 National Idling Reduction Network News June 4, 2015 - 12:19pm Addthis The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United States. Below is the

  17. July 2014 National Idling Reduction Network News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 National Idling Reduction Network News July 2014 National Idling Reduction Network News September 3, 2014 - 3:43pm Addthis The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United States. Below is the July

  18. July 2015 National Idling Reduction Network News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 National Idling Reduction Network News July 2015 National Idling Reduction Network News September 8, 2015 - 11:01am Addthis The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United States. Below is the July

  19. June 2014 National Idling Reduction Network News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    June 2014 National Idling Reduction Network News June 2014 National Idling Reduction Network News September 3, 2014 - 2:54pm Addthis The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United States. Below is

  20. September 2015 National Idling Reduction Network News | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 5 National Idling Reduction Network News September 2015 National Idling Reduction Network News November 5, 2015 - 12:26pm Addthis The National Idling Reduction Network brings together trucking and transit companies; railroads; ports; equipment manufacturers; Federal, state, and local government agencies (including regulators); nonprofit organizations; and national research laboratories to identify consistent, workable solutions to heavy-vehicle idling for the entire United States.

  1. Alternative Fuels Data Center: Delaware Reduces Truck Idling With

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Electrified Parking Areas Delaware Reduces Truck Idling With Electrified Parking Areas to someone by E-mail Share Alternative Fuels Data Center: Delaware Reduces Truck Idling With Electrified Parking Areas on Facebook Tweet about Alternative Fuels Data Center: Delaware Reduces Truck Idling With Electrified Parking Areas on Twitter Bookmark Alternative Fuels Data Center: Delaware Reduces Truck Idling With Electrified Parking Areas on Google Bookmark Alternative Fuels Data Center: Delaware

  2. Alternative Fuels Data Center: Federal Laws and Incentives for Idle

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Reduction Conserve Fuel Printable Version Share this resource Send a link to Alternative Fuels Data Center: Federal Laws and Incentives for Idle Reduction to someone by E-mail Share Alternative Fuels Data Center: Federal Laws and Incentives for Idle Reduction on Facebook Tweet about Alternative Fuels Data Center: Federal Laws and Incentives for Idle Reduction on Twitter Bookmark Alternative Fuels Data Center: Federal Laws and Incentives for Idle Reduction on Google Bookmark Alternative Fuels

  3. Idling Reduction for Emergency and Other Service Vehicles

    SciTech Connect (OSTI)

    2015-05-07

    This is a fact sheet about reducing idling for emergency and service vehicles. Emergency vehicles, such as police cars, ambulances, and fire trucks, along with other service vehicles such as armored cars, are often exempt from laws that limit engine idling. However, these vehicles can save fuel and reduce emissions with technologies that allow them to perform vital services without idling.

  4. xdamp Version 6 : an IDL-based data and image manipulation program.

    SciTech Connect (OSTI)

    Ballard, William Parker

    2012-04-01

    The original DAMP (DAta Manipulation Program) was written by Mark Hedemann of Sandia National Laboratories and used the CA-DISSPLA{trademark} (available from Computer Associates International, Inc., Garden City, NY) graphics package as its engine. It was used to plot, modify, and otherwise manipulate the one-dimensional data waveforms (data vs. time) from a wide variety of accelerators. With the waning of CA-DISSPLA and the increasing popularity of Unix(reg sign)-based workstations, a replacement was needed. This package uses the IDL(reg sign) software, available from Research Systems Incorporated, a Xerox company, in Boulder, Colorado, as the engine, and creates a set of widgets to manipulate the data in a manner similar to the original DAMP and earlier versions of xdamp. IDL is currently supported on a wide variety of Unix platforms such as IBM(reg sign) workstations, Hewlett Packard workstations, SUN(reg sign) workstations, Microsoft(reg sign) Windows{trademark} computers, Macintosh(reg sign) computers and Digital Equipment Corporation VMS(reg sign) and Alpha(reg sign) systems. Thus, xdamp is portable across many platforms. We have verified operation, albeit with some minor IDL bugs, on personal computers using Windows 7 and Windows Vista; Unix platforms; and Macintosh computers. Version 6 is an update that uses the IDL Virtual Machine to resolve the need for licensing IDL.

  5. Idling Reduction for Emergency and Other Service Vehicles

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    VEHICLE TECHNOLOGIES OFFICE Idling Reduction for Emergency and Other Service Vehicles Emergency vehicles, such as police cars, ambulances, and fire trucks, along with other service vehicles such as armored cars, are often exempt from laws that limit engine idling. However, these vehicles can save fuel and reduce emissions with technologies that allow them to perform vital services without idling. Police Vehicles Police cruisers spend much of their time parked and running while offcers monitor

  6. Alternative Fuels Data Center: Idle Reduction Laws and Incentives

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    More in this section... Idle Reduction Benefits & Considerations Heavy-Duty Vehicles Medium-Duty Vehicles Light-Duty Vehicles School Buses Laws & Incentives Research & Development ...

  7. A Municipal Official's Guide to Diesel Idling Reduction | Open...

    Open Energy Info (EERE)

    Planning Federation Sector: Climate, Energy Focus Area: Transportation Resource Type: Lessons learnedbest practices Website: www.nyserda.orgpublications09-06GuidetoDieselIdl...

  8. Rocky Flats Environmental Technology Site Idle Equipment, August...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Management Plan for Material Contained in Idle ... be enforceable as a requirement of this Order on ... through the RFCA budget planning process. * If ...

  9. Evaluating Benefits of Idling Restrictions in a Large Northern City |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy While an anti-idling law in a large northern city has brought about the deployment of anti-idling technologies in city vehicles, it has not had the same effect on some classes of private vehicles. PDF icon p-08_gaines.pdf More Documents & Publications Vehicle Technologies Office Merit Review 2014: CoolCab Test and Evaluation and CoolCalc HVAC Tool Development National Idling Reduction Network News - April 2014 National Idling Reduction Network News - October 20

  10. Case Study – Idling Reduction Technologies for Emergency Service Vehicles

    SciTech Connect (OSTI)

    Laughlin, Michael; Owens, Russell J.

    2016-01-01

    This case study explores the use of idle reduction technologies (IRTs) on emergency service vehicles in police, fire, and ambulance applications. Various commercially available IRT systems and approaches can decrease, or ultimately eliminate, engine idling. Fleets will thus save money on fuel, and will also decrease their criteria pollutant emissions, greenhouse gas emissions, and noise.

  11. Long-Haul Truck Idling Burns Up Profits

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Long-Haul Truck Idling Burns Up Profits Long-haul truck drivers perform a vitally important service. In the course of their work, they must take rest periods as required by federal law. Most drivers remain in their trucks, which they keep running to provide power for heating, cooling, and other necessities. Such idling, however, comes at a cost; it is an expensive and polluting way to keep drivers safe and comfortable. Increasingly affordable alternatives to idling not only save money and reduce

  12. Neutrino Factory Downstream Systems

    SciTech Connect (OSTI)

    Zisman, Michael S.

    2009-12-23

    We describe the Neutrino Factory accelerator systems downstream from the target and capture area. These include the bunching and phase rotation, cooling, acceleration, and decay ring systems. We also briefly discuss the R&D program under way to develop these systems, and indicate areas where help from CERN would be invaluable.

  13. Anti-Idling Battery for Truck Applications

    SciTech Connect (OSTI)

    Keith Kelly

    2011-09-30

    In accordance to the Assistance Agreement DE-EE0001036, the objective of this project was to develop an advanced high voltage lithium-ion battery for use in an all-electric HVAC system for Class-7-8 heavy duty trucks. This system will help heavy duty truck drivers meet the tough new anti-idling laws being implemented by over 23 states. Quallion will be partnering with a major OEM supplier of HVAC systems to develop this system. The major OEM supplier will provide Quallion the necessary interface requirements and HVAC hardware to ensure successful testing of the all-electric system. At the end of the program, Quallion will deliver test data on three (3) batteries as well as test data for the prototype HVAC system. The objectives of the program are: (1) Battery Development - Objective 1 - Define battery and electronics specifications in preparation for building the prototype module. (Completed - summary included in report) and Objective 2 - Establish a functional prototype battery and characterize three batteries in-house. (Completed - photos and data included in report); (2) HVAC Development - Objective 1 - Collaborate with manufacturers to define HVAC components, layout, and electronics in preparation for establishing the prototype system. (Completed - photos and data included in report) and Objective 2 - Acquire components for three functional prototypes for use by Quallion. (Completed - photos and data included in report).

  14. November 2014 National Idling Reduction Network News | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... West Palm Beach, Florida, now limits the idling of city utility vehicles to 5 minutes or less. According to the City, the policy will save tens of thousands of dollars each year. ...

  15. Which is Greener: Idle, or Stop and Restart? | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    National Idling Reduction Network News - December 2012 Cold-Start Performance and Emissions Behavior of Alcohol Fuels in an SIDI Engine Using Transient Hardware-In-Loop Test Meth ...

  16. January 2015 National Idling Reduction Network News | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... SAE 2015 Commercial Vehicle Engineering Congress October 6-8, 2015 (Rosemont, Illinois) ... of, idling incidents at a post office, a grocery store, and a fast-food drive-through. ...

  17. Idling Emissions Reduction Technology with Low Temperature Combustion...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Low Temperature Combustion of DI Biodiesel and PFI n-Butanol Idling Emissions Reduction Technology with Low Temperature Combustion of DI Biodiesel and PFI n-Butanol Results from an ...

  18. Alternative Fuels Data Center: Heavy-Duty Truck Idle Reduction Technologies

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Heavy-Duty Truck Idle Reduction Technologies to someone by E-mail Share Alternative Fuels Data Center: Heavy-Duty Truck Idle Reduction Technologies on Facebook Tweet about Alternative Fuels Data Center: Heavy-Duty Truck Idle Reduction Technologies on Twitter Bookmark Alternative Fuels Data Center: Heavy-Duty Truck Idle Reduction Technologies on Google Bookmark Alternative Fuels Data Center: Heavy-Duty Truck Idle Reduction Technologies on Delicious Rank Alternative Fuels Data Center: Heavy-Duty

  19. Alternative Fuels Data Center: Idaho County Employs FFVs and Idle Reduction

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Idaho County Employs FFVs and Idle Reduction to someone by E-mail Share Alternative Fuels Data Center: Idaho County Employs FFVs and Idle Reduction on Facebook Tweet about Alternative Fuels Data Center: Idaho County Employs FFVs and Idle Reduction on Twitter Bookmark Alternative Fuels Data Center: Idaho County Employs FFVs and Idle Reduction on Google Bookmark Alternative Fuels Data Center: Idaho County Employs FFVs and Idle Reduction on Delicious Rank Alternative Fuels Data Center: Idaho County

  20. Alternative Fuels Data Center: Light-Duty Vehicle Idle Reduction Strategies

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Light-Duty Vehicle Idle Reduction Strategies to someone by E-mail Share Alternative Fuels Data Center: Light-Duty Vehicle Idle Reduction Strategies on Facebook Tweet about Alternative Fuels Data Center: Light-Duty Vehicle Idle Reduction Strategies on Twitter Bookmark Alternative Fuels Data Center: Light-Duty Vehicle Idle Reduction Strategies on Google Bookmark Alternative Fuels Data Center: Light-Duty Vehicle Idle Reduction Strategies on Delicious Rank Alternative Fuels Data Center: Light-Duty

  1. Alternative Fuels Data Center: Idle-Reduction Efforts Cut Emissions and

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Conserve Fuel Idle-Reduction Efforts Cut Emissions and Conserve Fuel to someone by E-mail Share Alternative Fuels Data Center: Idle-Reduction Efforts Cut Emissions and Conserve Fuel on Facebook Tweet about Alternative Fuels Data Center: Idle-Reduction Efforts Cut Emissions and Conserve Fuel on Twitter Bookmark Alternative Fuels Data Center: Idle-Reduction Efforts Cut Emissions and Conserve Fuel on Google Bookmark Alternative Fuels Data Center: Idle-Reduction Efforts Cut Emissions and

  2. xdamp An IDL-based data and image manipulation program

    Energy Science and Technology Software Center (OSTI)

    2002-06-26

    xdamp is a graphical user interface (GUI) designed to allow the user to manipulate two-dimensional waveforms (data vs. time) and images (usually digitized radiographic film or digital camera outputs)that are typical of electrical engineering applications. A typical single data set from these applications will generate ~ 100 time-dependent waveforms and possibly a few images. xdamp can manipulate waveforms both in time and in amplitude. Typical operations are: time shifting, truncating before or after a specificmore » time, adding, multiplying, integrating, and averaging. When manipulating images, the spatial dimensions are maintained as important data. Standard electrical engineering quantities (maximum, minimum, fully-width-at-half-maximum, rise-time, mean, standard deviation) are calculated for each waveform and automatically displayed. Annotation can be added to each waveform and/or image and the overall file so that the data contains full documentation. PostScript printing is supported. xdamp supports full audit trail information on each waveform. Data are saved using the Hierarchical Data Format (HDF) from the National Center for Supercomputing Applications. xdamp uses the Interactive Data Language (IDL) from Research Systems, Inc., a Xerox company, as the processing engine. The entire program is written inthe IDL macro language to enhance portability. IDL is currently supported on the macintosh, alpha computers, Windows-based computers, and on virtually all UNIX platforms. Portability to all of these platforms has been verified. xdamp has a full internal language for creating macros useful for repetitive data reduction and analysis. xdamp can manipulate waveforms both in time and in amplitude. Some advanced features included are: the ability to compare waveforms in time and amplitude, the ability to generate high-frequence cable compensators, both integration and differentiation of waveforms, Fourier transforms of waveforms, and automatic execution of macros. Annotation can be added to each waveform and the overall file so that the data contains full documentation. Audit trails are maintained on each waveform. In addition to most of the waveform capabilities, xdamp can manipulate images in both space and amplitude. A variety of image processing capabilities are available such as mirroring around various axes, rotating through arbitrary angles, histogram equalization, Lee filtering, Roberts and Sobel edge enhancement algorithms and creating waveforms consisting of line-out profiles of images. Flexible printing to PostScript printers is supported as are both local and networked printers. Data are saved using the hierarchical Data Format (HDF) from the National Center for Supercomputing Applications. This format is highly compressed, self-encoded, and easily transportable across the Internet. There is also the capability of writing ASCII data files suitable for use by other plotting programs. Automatic generation of spreadsheet compatible files containing summary information for waveforms is also supported.« less

  3. Long-Haul Truck Idling Burns Up Profits

    SciTech Connect (OSTI)

    2015-08-12

    Long-haul truck drivers perform a vitally important service. In the course of their work, they must take rest periods as required by federal law. Most drivers remain in their trucks, which they keep running to provide power for heating, cooling, and other necessities. Such idling, however, comes at a cost; it is an expensive and polluting way to keep drivers safe and comfortable. Increasingly affordable alternatives to idling not only save money and reduce pollution, but also help drivers get a better night's rest.

  4. Fact #917: March 21, 2016 Work Truck Daily Idle Time by Industry...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7: March 21, 2016 Work Truck Daily Idle Time by Industry Fact 917: March 21, 2016 Work Truck Daily Idle Time by Industry SUBSCRIBE to the Fact of the Week Results of the 2015 Work ...

  5. Idling Emissions Reduction Technology with Low Temperature Combustion of DI Biodiesel and PFI n-Butanol

    Broader source: Energy.gov [DOE]

    Results from an idling strategy using PCCI coupled with LTC indicate that, when used with n-butanol, it can be very promising for extended idling including the LTC regimes.

  6. DOE Awards Grants to Evaluate Technologies that Reduce Truck Idling - News

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Releases | NREL DOE Awards Grants to Evaluate Technologies that Reduce Truck Idling January 29, 2004 Golden, Colo. - The U.S. Department of Energy's Advanced Vehicle Testing Activity has awarded separate project grants to Caterpillar Inc. and Schneider National Inc. to investigate technologies that reduce truck idling. According to industry experts, truck idling consumes more than 800 million gallons of fuel each year. Reducing the amount of fuel needed to support idling activities, such as

  7. Idling Pushes Profits out the Tailpipe

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    but without a separate piece of equipment. A small electric pump is connected to the water line, which keeps the truck's cooling system and heater operating after the engine is...

  8. Downstream extent of the N Reactor plume

    SciTech Connect (OSTI)

    Dauble, D.D.; Ecker, R.M.; Vail, L.W.; Neitzel, D.A.

    1987-09-01

    The downstream extent of the N Reactor thermal plume was studied to assess the potential for fisheries impacts downstream of N Reactor. The N Reactor plume, as defined by the 0.5/sup 0/F isotherm, will extend less than 10 miles downstream at river flows greater than or equal to annual average flows (120,000 cfs). Incremental temperature increases at the Oregon-Washington border are expected to be less than 0.5/sup 0/F during all Columbia River flows greater than the minimum regulated flows (36,000 cfs). The major physical factor affecting Columbia River temperatures in the Hanford Reach is solar radiation. Because the estimated temperature increase resulting from N Reactor operations is less than 0.3/sup 0/F under all flow scenarios, it is unlikely that Columbia River fish populations will be adversely impacted.

  9. Oil Bypass Filter and Diesel Engine Idling Wear-Rate Evaluations...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bypass Filter and Diesel Engine Idling Wear-Rate Evaluations Oil Bypass Filter and Diesel ... More Documents & Publications Demonstrated Petroleum Reduction Using Oil Bypass Filter ...

  10. Fact #861 February 23, 2015 Idle Fuel Consumption for Selected Gasoline and Diesel Vehicles

    Broader source: Energy.gov [DOE]

    Based on a worksheet developed by Argonne National Laboratory, the idle fuel consumption rate for selected gasoline and diesel vehicles with no load (no use of accessories such as air conditioners,...

  11. Fact #787: July 8, 2013 Truck Stop Electrification Reduces Idle Fuel Consumption

    Broader source: Energy.gov [DOE]

    The U.S. Department of Transportation mandates that truckers rest for 10 hours after driving for 11 hours, during which time they often park at truck stops idling the engines to provide heating,...

  12. How Do You Reduce the Time You Spend Idling? | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    How Do You Reduce the Time You Spend Idling? November 4, 2010 - 7:30am Addthis On Tuesday, Shannon discussed some efforts by Clean Cities, parents, and students to reduce the time ...

  13. DIESEL TRUCK IDLING EMISSIONS - MEASUREMENTS AT A PM2.5 HOT SPOT

    SciTech Connect (OSTI)

    Parks, II, James E; Miller, Terry L.; Storey, John Morse; Fu, Joshua S.; Hromis, Boris

    2007-01-01

    The University of Tennessee and Oak Ridge National Laboratory conducted a 5-month long air monitoring study at the Watt Road interchange on I-40 in Knoxville Tennessee where there are 20,000 heavy-duty trucks per day traveling the interstate. In addition, there are 3 large truck stops at this interchange where as many as 400 trucks idle engines at night. As a result, high levels of PM2.5 were measured near the interchange often exceeding National Ambient Air Quality Standards. This paper presents the results of the air monitoring study illustrating the hourly, day-of-week, and seasonal patterns of PM2.5 resulting from diesel truck emissions on the interstate and at the truck stops. Surprisingly, most of the PM2.5 concentrations occurred during the night when the largest contribution of emissions was from idling trucks rather than trucks on the interstate. A nearby background air monitoring site was used to identify the contribution of regional PM2.5 emissions which also contribute significantly to the concentrations measured at the site. The relative contributions of regional background, local truck idling and trucks on the interstate to local PM2.5 concentrations are presented and discussed in the paper. The results indicate the potential significance of diesel truck idling emissions to the occurrence of hot-spots of high PM2.5 concentrations near large truck stops, ports or border crossings.

  14. Oil Bypass Filter and Diesel Engine Idling Wear-Rate Evaluations |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy 05 Diesel Engine Emissions Reduction (DEER) Conference Presentations and Posters PDF icon 2005_deer_zirker.pdf More Documents & Publications Demonstrated Petroleum Reduction Using Oil Bypass Filter Technology on Heavy and Light Vehicles Development of Partial Filter Technology for HDD Retrofit Comparing Emissions Benefits from Regulating Heavy Vehicle Idling

  15. U.S. Downstream Charge Capacity of Operable Petroleum Refineries

    U.S. Energy Information Administration (EIA) Indexed Site

    Catalytic Reforming 3,700,463 3,720,613 3,641,813 3,758,347 3,759,323 3,740,763 1982-2015 Low Pressure 2,322,700 2,390,950 2,347,850 2,486,550 2,541,250 2,615,750 1987-2015 High ...

  16. Philippines' downstream sector poised for growth

    SciTech Connect (OSTI)

    Not Available

    1992-05-11

    This paper reports that the Philippines' downstream sector is poised for sharp growth. Despite a slip in refined products demand in recent years, Philippines products demand will rebound sharply by 2000, East-West Center (EWC), Honolulu, predicts. Philippines planned refinery expansions are expected to meet that added demand, EWC Director Fereidun Fesharaki says. Like the rest of the Asia-Pacific region, product specifications are changing, but major refiners in the area expect to meet the changes without major case outlays. At the same time, Fesharaki says, push toward deregulation will further bolster the outlook for the Philippines downstream sector.

  17. Emissions from Idling Trucks for Extended Time Periods | Department of

    Broader source: Energy.gov (indexed) [DOE]

    Energy 2 DEER Conference Presentation: Oak Ridge National Laboratory PDF icon 2002_deer_lewis.pdf More Documents & Publications 21st Century Truck Partnership - Roadmap and Technical White Papers Appendix of Supporting Information - 21CTP-0003, December 2006 Technical Demonstration of 2010 Emissions Regulations over Transient Operation 21st Century Truck Partnership Roadmap Roadmap and Technical White Papers - 21CTP-0003, December 2006

  18. Sleeper Cab Climate Control Load Reduction for Long-Haul Truck Rest Period Idling

    SciTech Connect (OSTI)

    Lustbader, J. A.; Kreutzer, C.; Adelman, S.; Yeakel, S.; Zehme, J.

    2015-04-29

    Annual fuel use for long-haul truck rest period idling is estimated at 667 million gallons in the United States. The U.S. Department of Energy’s National Renewable Energy Laboratory’s CoolCab project aims to reduce heating, ventilating, and air conditioning (HVAC) loads and resulting fuel use from rest period idling by working closely with industry to design efficient long-haul truck climate control systems while maintaining occupant comfort. Enhancing the thermal performance of cab/sleepers will enable smaller, lighter, and more cost-effective idle reduction solutions. In order for candidate idle reduction technologies to be implemented at the original equipment manufacturer and fleet level, their effectiveness must be quantified. To address this need, a number of promising candidate technologies were evaluated through experimentation and modeling to determine their effectiveness in reducing rest period HVAC loads. For this study, load reduction strategies were grouped into the focus areas of solar envelope, occupant environment, and conductive pathways. The technologies selected for a complete-cab package of technologies were “ultra-white” paint, advanced insulation, and advanced curtains. To measure the impact of these technologies, a nationally-averaged solar-weighted reflectivity long-haul truck paint color was determined and applied to the baseline test vehicle. Using the complete-cab package of technologies, electrical energy consumption for long-haul truck daytime rest period air conditioning was reduced by at least 35% for summer weather conditions in Colorado. The National Renewable Energy Laboratory's CoolCalc model was then used to extrapolate the performance of the thermal load reduction technologies nationally for 161 major U.S. cities using typical weather conditions for each location over an entire year.

  19. Fact #916: March 14, 2016 Fuel Savings/Emissions Reduction was the Top Reason Cited by Truck Fleet Management for Adopting Idle Reduction Technologies- Dataset

    Broader source: Energy.gov [DOE]

    Excel file and dataset for Fuel Savings/Emissions Reduction was the Top Reason Cited by Truck Fleet Management for Adopting Idle Reduction Technologies

  20. EIA-812

    U.S. Energy Information Administration (EIA) Indexed Site

    ... Idle Capacity) Net Available Shell (Total) Idle In Operation Working (Excl. Idle Capacity) Net Available Shell (Total) Idle In Operation Working (Excl. Idle Capacity) Net Available ...

  1. Written Statement of Peggy Montana, Shell Downstream Quadrennial...

    Broader source: Energy.gov (indexed) [DOE]

    April 11. 2014 Good Morning. I am Peggy Montana, Executive Vice President, Pipelines and Special Projects, for Shell Downstream Inc. My previous role was EVP Supply...

  2. Microelectromechanical accelerometer with resonance-cancelling control circuit including an idle state

    DOE Patents [OSTI]

    Chu, Dahlon D.; Thelen, Jr., Donald C.; Campbell, David V.

    2001-01-01

    A digital feedback control circuit is disclosed for use in an accelerometer (e.g. a microelectromechanical accelerometer). The digital feedback control circuit, which periodically re-centers a proof mass in response to a sensed acceleration, is based on a sigma-delta (.SIGMA..DELTA.) configuration that includes a notch filter (e.g. a digital switched-capacitor filter) for rejecting signals due to mechanical resonances of the proof mass and further includes a comparator (e.g. a three-level comparator). The comparator generates one of three possible feedback states, with two of the feedback states acting to re-center the proof mass when that is needed, and with a third feedback state being an "idle" state which does not act to move the proof mass when no re-centering is needed. Additionally, the digital feedback control system includes an auto-zero trim capability for calibration of the accelerometer for accurate sensing of acceleration. The digital feedback control circuit can be fabricated using complementary metal-oxide semiconductor (CMOS) technology, bi-CMOS technology or bipolar technology and used in single- and dual-proof-mass accelerometers.

  3. Transition duct with divided upstream and downstream portions

    DOE Patents [OSTI]

    McMahan, Kevin Weston; LeBegue, Jeffrey Scott; Maldonado, Jaime Javier; Dillard, Daniel Jackson; Flanagan, James Scott

    2015-07-14

    Turbine systems are provided. In one embodiment, a turbine system includes a transition duct comprising an inlet, an outlet, and a duct passage extending between the inlet and the outlet and defining a longitudinal axis, a radial axis, and a tangential axis. The outlet of the transition duct is offset from the inlet along the longitudinal axis and the tangential axis. The duct passage includes an upstream portion extending from the inlet and a downstream portion extending from the outlet. The turbine system further includes a rib extending from an outer surface of the duct passage, the rib dividing the upstream portion and the downstream portion.

  4. Large-Scale Algal Cultivation, Harvesting and Downstream Processing Workshop

    Broader source: Energy.gov [DOE]

    ATP3 (Algae Testbed Public-Private Partnership) is hosting the Large-Scale Algal Cultivation, Harvesting and Downstream Processing Workshop on November 2–6, 2015, at the Arizona Center for Algae Technology and Innovation in Mesa, Arizona. Topics will include practical applications of growing and managing microalgal cultures at production scale (such as methods for handling cultures, screening strains for desirable characteristics, identifying and mitigating contaminants, scaling up cultures for outdoor growth, harvesting and processing technologies, and the analysis of lipids, proteins, and carbohydrates). Related training will include hands-on laboratory and field opportunities.

  5. Investigation of Diesel combustion using multiple injection strategies for idling after cold start of passenger-car engines

    SciTech Connect (OSTI)

    Payri, F.; Broatch, A.; Salavert, J.M.; Martin, J.

    2010-10-15

    A comprehensive investigation was carried out in order to better understand the combustion behaviour in a low compression ratio DI Diesel engine when multiple injection strategies are applied just after the engine cold starts in low temperature conditions (idling). More specifically, the aim of this study was twofold: on one hand, to understand the effect of the multiple injection strategies on the indicated mean effective pressure; on the other hand, to contribute to the understanding of combustion stability characterized by the coefficient of variation of indicated mean effective pressure. The first objective was fulfilled by analyzing the rate of heat release obtained by in-cylinder pressure diagnosis. The results showed that the timing of the pilot injection closest to the main injection was the most influential parameter based on the behaviour of the rate of heat release (regardless of the multiple injection strategy applied). For the second objective, the combustion stability was found to be correlated with the combustion centroid angle. The results showed a trend between them and the existence of a range of centroid angles where the combustion stability is strong enough. In addition, it was also evident that convenient split injection allows shifting the centroid to such a zone and improves combustion stability after start. (author)

  6. Reducing Idle Power Consumption in Office Spaces Saves U.S. Navy in Energy Costs (Fact Sheet), NREL (National Renewable Energy Laboratory)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Reducing Idle Power Consumption in Office Spaces Saves U.S. Navy in Energy Costs As part of a two-year project to demonstrate energy efficiency measures, renewable energy generation, and energy systems integration, the National Renewable Energy Laboratory (NREL) has identified advanced plug load controls as a promising technology for reducing energy use and related costs in the U.S. Navy's Naval Facilities Engineering Command (NAVFAC) office spaces. The demonstration was one of eight

  7. Reactivation of an Idle Lease to Increase Heavy Oil Recovery through Application of Conventional Steam Drive Technology in a Low Dip Slope and Basin Reservoir in the Midway-Sunset Field, San Jaoquin Basin, California

    SciTech Connect (OSTI)

    Steven Schamel

    1998-02-27

    A previously idle portion of the Midway-Sunset field, the ARCO Western Energy Pru Fee property, is being brought back into commercial production through tight integration of geologic characterization, geostatistical modeling, reservoir simulation, and petroleum engineering. This property, shut-in over a decade ago as economically marginal using conventional cyclic steaming methods, has a 200-300 foot thick oil column in the Monarch Sand. However, the sand lacks effective steam barriers and has a thick water-saturation zone above the oil-water contact. These factors require an innovative approach to steam flood production design that will balance optimal total oil production against economically viable steam-oil ratios and production rates. The methods used in the Class III demonstration are accessible to most operators in the Midway-Sunset field and could be used to revitalize properties with declining production of heavy oils throughout the region. In January 1997 the project entered its second and main phase with the purpose of demonstrating whether steamflood can be a more effective mode of production of the heavy, viscous oils from the Monarch Sand reservoir than the more conventional cyclic steaming. The objective is not just to produce the pilot site within the Pru Fee property south of Taft, but to test which production parameters optimize total oil recovery at economically acceptable rates of production and production costs.

  8. Quantifying the Effects of Idle-Stop Systems on Fuel Economy in Light-Duty Passenger Vehicles

    SciTech Connect (OSTI)

    Jeff Wishart; Matthew Shirk

    2012-12-01

    Vehicles equipped with idle-stop (IS) systems are capable of engine shut down when the vehicle is stopped and rapid engine re-start for the vehicle launch. This capability reduces fuel consumption and emissions during periods when the engine is not being utilized to provide propulsion or to power accessories. IS systems are a low-cost and fast-growing technology in the industry-wide pursuit of increased vehicle efficiency, possibly becoming standard features in European vehicles in the near future. In contrast, currently there are only three non-hybrid vehicle models for sale in North America with IS systems and these models are distinctly low-volume models. As part of the United States Department of Energy’s Advanced Vehicle Testing Activity, ECOtality North America has tested the real-world effect of IS systems on fuel consumption in three vehicle models imported from Europe. These vehicles were chosen to represent three types of systems: (1) spark ignition with 12-V belt alternator starter; (2) compression ignition with 12-V belt alternator starter; and (3) direct-injection spark ignition, with 12-V belt alternator starter/combustion restart. The vehicles have undergone both dynamometer and on-road testing; the test results show somewhat conflicting data. The laboratory data and the portion of the on-road data in which driving is conducted on a prescribed route with trained drivers produced significant fuel economy improvement. However, the fleet data do not corroborate improvement, even though the data show significant engine-off time. It is possible that the effects of the varying driving styles and routes in the fleet testing overshadowed the fuel economy improvements. More testing with the same driver over routes that are similar with the IS system-enabled and disabled is recommended. There is anecdotal evidence that current Environmental Protection Agency fuel economy test procedures do not capture the fuel economy gains that IS systems produce in real-world driving. The program test results provide information on the veracity of these claims.

  9. Operation Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operation Schedule Daily Hours of Operation

  10. Operating experience with 100% pellet burden on Amanda blast furnace

    SciTech Connect (OSTI)

    Keaton, D.E.; Minakawa, T. . Ironmaking Dept.)

    1993-01-01

    A number of significant changes in operations at the Ashland Works of the Armco Steel Company occurred in 1992 which directly impacted the Amanda Blast Furnace operation. These changes included the shutdown of the hot strip mill which resulted in coke oven gas enrichment of the Amanda stoves and an increase of 75 C in hot blast temperature, transition to 100% continuous cast operation which resulted in increased variation of the hot metal demand, and the July idling of the sinter plant. Historically, the Amanda Blast Furnace burden was 30% fluxed sinter and 70% acid pellet. It was anticipated that the change to 100% pellet burden would require changes in charging practice and alter furnace performance. The paper gives a general furnace description and then describes the burden characteristics, operating practice with 30% sinter/70% acid pellet burden, preparations for the 100% acid pellet burden operation, the 100% acid pellet operation, and the 100% fluxed pellet burden operation.

  11. Refinery Capacity Report

    U.S. Energy Information Administration (EIA) Indexed Site

    Vacuum State/Refiner/Location Barrels per Atmospheric Crude Oil Distillation Capacity Barrels per Operating Idle Operating Idle Downstream Charge Capacity Thermal Cracking Delayed Fluid Coking Visbreaking Other/Gas Calendar Day Stream Day Distillation Coking Oil Table 3. Capacity of Operable Petroleum Refineries by State as of January 1, 2015 (Barrels per Stream Day, Except Where Noted) ......................................................... Alabama 120,100 0 135,000 0 45,000 32,000 0 0 0

  12. Measurement of velocity deficit at the downstream of a 1:10 axial hydrokinetic turbine model

    SciTech Connect (OSTI)

    Gunawan, Budi; Neary, Vincent S; Hill, Craig; Chamorro, Leonardo

    2012-01-01

    Wake recovery constrains the downstream spacing and density of turbines that can be deployed in turbine farms and limits the amount of energy that can be produced at a hydrokinetic energy site. This study investigates the wake recovery at the downstream of a 1:10 axial flow turbine model using a pulse-to-pulse coherent Acoustic Doppler Profiler (ADP). In addition, turbine inflow and outflow velocities were measured for calculating the thrust on the turbine. The result shows that the depth-averaged longitudinal velocity recovers to 97% of the inflow velocity at 35 turbine diameter (D) downstream of the turbine.

  13. Evaluation of the Biological Effects of the Northwest Power Conservation Council's Mainstem Amendment on the Fisheries Upstream and Downstream of Libby Dam, Montana, 2007-2008 Annual Report.

    SciTech Connect (OSTI)

    Sylvester, Ryan; Stephens, Brian; Tohtz, Joel

    2009-04-03

    A new project began in 2005 to monitor the biological and physical effects of improved operations of Hungry Horse and Libby Dams, Montana, called for by the Northwest Power and Conservation Council (NPCC) Mainstem Amendment. This operating strategy was designed to benefit resident fish impacted by hydropower and flood control operations. Under the new operating guidelines, July through September reservoir drafts will be limited to 10 feet from full pool during the highest 80% of water supply years and 20 feet from full pool during the lowest 20% of water supply (drought) years. Limits were also established on how rapidly discharge from the dams can be increased or decreased depending on the season. The NPCC also directed the federal agencies that operate Libby and Hungry Horse Dams to implement a new flood control strategy (VARQ) and directed Montana Fish, Wildlife & Parks to evaluate biological responses to this operating strategy. The Mainstem Amendment operating strategy has not been fully implemented at the Montana dams as of June 2008 but the strategy will be implemented in 2009. This report highlights the monitoring methods used to monitor the effects of the Mainstem Amendment operations on fishes, habitat, and aquatic invertebrates upstream and downstream of Libby Dam. We also present initial assessments of data and the effects of various operating strategies on physical and biological components of the systems upstream and downstream of Libby Dam. Annual electrofishing surveys in the Kootenai River and selected tributaries, along with gill net surveys in the reservoir, are being used to quantify the impacts of dam operations on fish populations upstream and downstream of Libby Dam. Scales and otoliths are being used to determine the age structure and growth of focal species. Annual population estimates and tagging experiments provide estimates of survival and growth in the mainstem Kootenai River and selected tributaries. Radio telemetry will be used to validate an existing Instream Flow Incremental Methodology (IFIM) model developed for the Kootenai River and will also be used to assess the effect of changes in discharge on fish movements and habitat use downstream of Libby Dam. Passive integrated transponder (PIT) tags will be injected into rainbow, bull, and cutthroat trout throughout the mainstem Kootenai River and selected tributaries to provide information on growth, survival, and migration patterns in relation to abiotic and biotic variables. Model simulations (RIVBIO) are used to calculate the effects of dam operations on the wetted perimeter and benthic biomass in the Kootenai River below Libby Dam. Additional models (IFIM) will also be used to evaluate the impacts of dam operations on the amount of available habitat for different life stages of rainbow and bull trout in the Kootenai River.

  14. Estimating Adult Chinook Salmon Exposure to Dissolved Gas Supersaturation Downstream of Hydroelectric Dams Using Telemetry and Hydrodynamic Models

    SciTech Connect (OSTI)

    Johnson, Eric L.; Clabough, Tami S.; Peery, Christopher A.; Bennett, David H.; bjornn, Theodore C.; Caudill, Christopher C.; Richmond, Marshall C.

    2007-11-01

    Gas bubble disease (GBD) has been recognized for years as a potential problem for fishes in the Columbia River basin. GBD results from exposure to gas supersaturated water created by discharge over dam spillways. Spill typically creates a downstream plume of water with high total dissolved gas supersaturation (TDGS) that may be positioned along either shore or mid-channel, depending on dam operations. We obtained spatial data on fish migration paths and migration depths for 228 adult spring and summer Chinook salmon, Oncorhynchus tshawytscha, during 2000. Migration paths were compared to output from a two-dimensional hydrodynamic and dissolved gas model to estimate the potential for GBD expression and to test for behavioral avoidance of the high TDGS plume in unrestrained fish migrating under field conditions. Consistent with our previous estimates using single-location estimates of TDGS, we observed salmon swam sufficiently deep in the water column to receive complete hydrostatic compensation 95.9% of time spent in the Bonneville tailrace and 88.1% of the time in the Ice Harbor tailrace. The majority of depth uncompensated exposure occurred at TDGS levels > 115%. Adult spring and summer Chinook salmon tended to migrate near the shoreline. Adults moved into the high dissolved gas plume as often as they moved out of it downstream of Bonneville Dam, providing no evidence that adults moved laterally to avoid areas with elevated dissolved gas levels. The strong influence of dam operations on the position of the high-TDGS plume and shoreline-orientation behaviors of adults suggest that exposure of adult salmonids to high-TDGS conditions may be minimized using operational conditions that direct the plume mid-channel, particularly during periods of high discharge and spill. More generally, our approach illustrates the potential for combined field and modeling efforts to estimate the fine-scale environmental conditions encountered by fishes in natural and regulated rivers.

  15. Recent hydrocarbon developments in Latin America: Key issues in the downstream oil sector

    SciTech Connect (OSTI)

    Wu, K.; Pezeshki, S.

    1995-03-01

    This report discusses the following: (1) An overview of major issues in the downstream oil sector, including oil demand and product export availability, the changing product consumption pattern, and refineries being due for major investment; (2) Recent upstream developments in the oil and gas sector in Argentina, Bolivia, Brazil, Chile, Colombia, Ecuador, Mexico, Peru, Trinidad and Tobago, and Venezuela; (3) Recent downstream developments in the oil and gas sector in Argentina, Chile, Colombia, Ecuador, Mexico, Peru, Cuba, and Venezuela; (4) Pipelines in Argentina, Bolivia, Brazil, Chile, and Mexico; and (5) Regional energy balance. 4 figs., 5 tabs.

  16. ,"Catalytic Reforming Downstream Processing of Fresh Feed Input"

    U.S. Energy Information Administration (EIA) Indexed Site

    Catalytic Reforming Downstream Processing of Fresh Feed Input" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Catalytic Reforming Downstream Processing of Fresh Feed Input",16,"Monthly","2/2016","1/15/2010" ,"Release Date:","4/29/2016" ,"Next Release

  17. Economic Analysis of Commercial Idling Reduction Technologies: Which idling

    Broader source: Energy.gov (indexed) [DOE]

    (SMART) | Department of Energy Ecology Action: Small Market Advanced Retrofit Transformation Program (SMART) Lead Performer: Ecology Action - Santa Cruz, CA Partners: - New Buildings Institute - Portland, OR - Electric and Gas Industries Association (EGIA) - Sacramento, CA - Pacific Gas and Electric - San Francisco, CA - Sacramento Municipal Utility District - Sacramento, CA DOE Total Funding: $2,000,000 Cost Share: $2,000,000 Project Term: October 1, 2013 - September 30, 2016 Funding

  18. Downstream plasma transport and metal ionization in a high-powered pulsed-plasma magnetron

    SciTech Connect (OSTI)

    Meng, Liang; Szott, Matthew M.; McLain, Jake T.; Ruzic, David N.; Yu, He

    2014-06-14

    Downstream plasma transport and ionization processes in a high-powered pulsed-plasma magnetron were studied. The temporal evolution and spatial distribution of electron density (n{sub e}) and temperature (T{sub e}) were characterized with a 3D scanning triple Langmuir probe. Plasma expanded from the racetrack region into the downstream region, where a high n{sub e} peak was formed some time into the pulse-off period. The expansion speed and directionality towards the substrate increased with a stronger magnetic field (B), largely as a consequence of a larger potential drop in the bulk plasma region during a relatively slower sheath formation. The fraction of Cu ions in the deposition flux was measured on the substrate using a gridded energy analyzer. It increased with higher pulse voltage. With increased B field from 200 to 800 Gauss above racetrack, n{sub e} increased but the Cu ion fraction decreased from 42% to 16%. A comprehensive model was built, including the diffusion of as-sputtered Cu flux, the Cu ionization in the entire plasma region using the mapped n{sub e} and T{sub e} data, and ion extraction efficiency based on the measured plasma potential (V{sub p}) distribution. The calculations matched the measurements and indicated the main causes of lower Cu ion fractions in stronger B fields to be the lower T{sub e} and inefficient ion extraction in a larger pre-sheath potential.

  19. Electromagnetic energy conversion in downstream fronts from three dimensional kinetic reconnection

    SciTech Connect (OSTI)

    Lapenta, Giovanni [Departement Wiskunde, KU Leuven, Universiteit Leuven (Belgium)] [Departement Wiskunde, KU Leuven, Universiteit Leuven (Belgium); Goldman, Martin; Newman, David [University of Colorado, Colorado 80309 (United States)] [University of Colorado, Colorado 80309 (United States); Markidis, Stefano [High Performance Computing and Visualization (HPCViz) Department, KTH Royal Institute of Technology, Stockholm (Sweden)] [High Performance Computing and Visualization (HPCViz) Department, KTH Royal Institute of Technology, Stockholm (Sweden); Divin, Andrey [Swedish Institute of Space Physics, Uppsala (Sweden)] [Swedish Institute of Space Physics, Uppsala (Sweden)

    2014-05-15

    The electromagnetic energy equation is analyzed term by term in a 3D simulation of kinetic reconnection previously reported by Vapirev et al. [J. Geophys. Res.: Space Phys. 118, 1435 (2013)]. The evolution presents the usual 2D-like topological structures caused by an initial perturbation independent of the third dimension. However, downstream of the reconnection site, where the jetting plasma encounters the yet unperturbed pre-existing plasma, a downstream front is formed and made unstable by the strong density gradient and the unfavorable local acceleration field. The energy exchange between plasma and fields is most intense at the instability, reaching several pW/m{sup 3}, alternating between load (energy going from fields to particles) and generator (energy going from particles to fields) regions. Energy exchange is instead purely that of a load at the reconnection site itself in a region focused around the x-line and elongated along the separatrix surfaces. Poynting fluxes are generated at all energy exchange regions and travel away from the reconnection site transporting an energy signal of the order of about S?10{sup ?3}W/m{sup 2}.

  20. Laboratory Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory Operations /newsroom/_assets/images/operations-icon.png Laboratory Operations Latest announcements from the Lab on its operations. Community, Events Laboratory Operations Environmental Stewardship Melissa Blueflower-Sanchez and Robert Sanchez, owners of R and M Construction, LLC, of Santa Clara Pueblo. Four regional businesses receive Native American Venture Acceleration Fund grants The grants are designed to help the recipients create jobs, increase their revenue base and help

  1. Operational Excellence

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operational Excellence /about/_assets/images/icon-70th.jpg Operational Excellence The Lab's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. aeiral shot of los alamos, new mexico What Los Alamos gets done as a premier national security science laboratory depends on how we do it The Laboratory's operations and business

  2. Operations Videos

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Research Analysts The U.S. Energy Information Administration (EIA) within the Department of Energy has forged a world-class information program that stresses quality, teamwork, and employee growth. In support of our program, we offer a variety of profes- sional positions, including the Operations Research Analyst, whose work is associated with the development and main- tenance of energy modeling systems. Responsibilities: Operations Research Analysts perform or participate in one or

  3. SPEAR Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Interface 1113 N. Kurita J. Langton Vacuum TSP's 1120 J. Corbett A. Terebilo MATLAB Applications - Basics 1121 F. Rafael Booster Kicker Upgrade, Operation Manual 1121...

  4. operations center

    National Nuclear Security Administration (NNSA)

    servers and other critical Operations Center equipment

  5. Independent air supply system filtered to protect against biological and radiological agents (99.7%).
  6. <...

  7. EIA-813

    U.S. Energy Information Administration (EIA) Indexed Site

    Working Storage Capacity (Exclude Idle Capacity) Net Available Shell Storage Capacity (Total) Idle In Operation (Exclusive Use) In Operation (Leased to Others) Item Description ...

  8. Operating Costs

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-03-28

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  9. Operating Strategies

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operating Strategies and Design Recommendations for Mitigating Local Damage Effects in Offshore Turbine Blades Phillip W. Richards phillip@gatech.edu Graduate Research Assistant Daniel Guggenheim School of Aerospace Engineering Atlanta, Georgia, USA D. Todd Griffith dgriffi@sandia.gov Principal Member of the Technical Staff Sandia National Laboratories Albuquerque, New Mexico, USA Dewey H. Hodges dhodges@gatech.edu Professor Daniel Guggenheim School of Aerospace Engineering Atlanta, Georgia, USA

  10. Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (~ii~,Richland Operations Office ~Z4TESO~Richland, Washington 99352 SEP 2 2009 CERTIFIED MAIL Ms. Sarah Washburn Heart of America Northwest 1314 N.E. 5 6 th Street Suite 100 Seattle, Washington 98105 Dear Ms. Washburn: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0067) You requested, pursuant to the Freedom of Information Act (FOJA), the following documents relating to: 1 . "The authorization, decision to use, and actual use of any and all pesticides and herbicides anywhere within the

  11. A 50-month gasifier mechanistic study and downstream unit process development program for the pressurized ash-agglomerating fluidized-bed gasification system

    SciTech Connect (OSTI)

    Haldipur, G.B.; Schmidt, D.K.; Smith, K.J.

    1989-03-01

    This technology development program scope included studies of those processes and components necessary to convert coal, oxidant and steam into a clean fuel gas. The configuration of the processes and components constitutes a Gasifier Island which is a key concept in the application of the KRW gasification and cleanup technologies. This Gasifier Island typically consists of process units that perform the following functions: feedstock preparation, gasification, desulfurization, heat recovery, particulate removal, and solid waste treatment. The processing has been conducted in a variety of gasifier operating modes including air-blown and oxygen-blown, both with and without in-bed desulfurization which includes injection of limestone or dolomite sorbent. Process configurations downstream of the gasifier have included recycle and non-recycle cyclones, sintered filters, and zinc ferrite fixed beds. Because of the developmental nature of the KRW technology program and the flexibility of the pilot plant itself, a wide range of gasifier-cleanup process configurations has been investigated. The KRW pilot plant program evaluated a system comprised of the following major process elements: gasifier and in-bed desulfurizer, particulate cleanup train, external sulfur polishing bed, and solid waste disposal system.

  12. Vehicle Technologies Office: 21st Century Truck Partnership ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... losses, auxiliary loads) Idle Reduction (reduce overnight and work-day idling) Safety (crash avoidance, intelligent transportation systems) Operational Efficiency (vehicle duty ...

  13. State of Terengganu: A development plan for the petrochemical industry and its associated downstream industries. Final report

    SciTech Connect (OSTI)

    Not Available

    1987-01-08

    This study, conducted by Chem Systems, Inc., was funded by the U.S. Trade and Development Agency on behalf of Terengganu's State Economic Planning Unit. The main objectives of the report are to: (1) Identify and list all medium stream and downstream activities, including services in petrochemical industries, using natural gas-derived ethane, propane, and butane as main feedstock and other linkages; (2) List the various enterprises noted above that can be economically and viably established in Terengganu; (3) Identify and locate the various sites for the projects identified. This is volume 1 of 2 and it contains the Final Report.

  14. State of Terengganu: A development plan for the petrochemical industry and its associated downstream industries. Appendix. Export trade information

    SciTech Connect (OSTI)

    Not Available

    1987-02-01

    The study, conducted by Chem Systems, Inc., was funded by the U.S. Trade and Development Agency on behalf of Terengganu's State Economic Planning Unit. The main objectives of the report are to: (1) Identify and list all medium stream and downstream activities, including services in petrochemical industries, using natural gas-derived ethane, propane, and butane as main feedstock and other linkages; (2) List the various enterprises noted above that can be economically and viably established in Terengganu; (3) Identify and locate the various sites for the projects identified. This is volume 2 of 2 and it contains the Appendix.

  15. Calutron Operations | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Calutron Operations

  16. Benthic invertebrate metals exposure, accumulation, and community-level effects downstream from a hard-rock mine site

    SciTech Connect (OSTI)

    Beltman, D.J.; Lipton, J.; Cacela, D.; Clements, W.H.

    1999-02-01

    This study quantitatively evaluated the relationships among As, Co, and Cu concentrations in exposure media (surface water, sediment, and aufwuchs), As, Co, and Cu concentrations in aquatic macroinvertebrates, and invertebrate community structure in a mine-affected stream. Concentrations of As, Co, and Cu were significantly elevated in both exposure media and invertebrate tissue downstream from the mine. Copper in invertebrates was significantly correlated only with Cu in aufwuchs, and Co in invertebrates was significantly correlated only with dissolved Co in water, suggesting different mechanisms of invertebrate accumulation for these two metals. The invertebrate community was severely affected downstream from the mine, with a loss of metals-sensitive species and reductions in both total biomass and number of species. Total abundance was not affected. Principal components analysis was performed on the invertebrate community data to develop a simplified description of community response to mine inputs. Based on this index, metal concentrations in invertebrates were poor predictors of community structure. Copper concentrations in water, combined with an estimate of invertebrate drift from clean tributaries, were statistically significant predictors of community structure.

  17. Mercury in Fish Collected Upstream and Downstream of Los Alamos National Laboratory, New Mexico: 1991--2004.

    SciTech Connect (OSTI)

    P.R. Fresquez

    2004-10-15

    Small amounts of mercury (Hg) may exist in some canyon drainage systems within Los Alamos National Laboratory lands as a result of past discharges of untreated effluents. This paper reports on the concentrations of Hg in muscle (fillets) of various types of fish species collected downstream of LANL's influence from 1991 through 2004. The mean Hg concentration in fish from Cochiti reservoir (0.22 {micro}g/g wet weight), which is located downstream of LANL, was similar to fish collected from a reservoir upstream of LANL (Abiquiu) (0.26 {micro}g/g wet weight). Mercury concentrations in fish collected from both reservoirs exhibited significantly (Abiquiu = p < 0.05 and Cochiti = p < 0.10) decreasing trends over time. Predator fish like the northern pike (Esox lucius) contained significantly higher concentrations of Hg (0.39 {micro}g/g wet weight) than bottom-feeding fish like the white sucker (Catostomus commersoni) (0.10 {micro}g/g wet weight).

  18. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2003 Annual Report.

    SciTech Connect (OSTI)

    Martinson, Rick D.; Kamps, Jeffrey W.; Kovalchuk, Gregory M.

    2004-02-01

    The 2003 spring flows were within 7 kcfs of last year's flows, but the summer flows were significantly lower, averaging 194 kcfs compared to 278 kcfs last year. Late summer and fall flows were within 20 kcfs of last year's flows. These flow levels provided good migration conditions for juvenile salmonids, comparable to last year, except in June and July. Monthly average river flows were lower than the historical averages. The number of fish handled at John Day decreased from 257,741 last year to 166,209 this year. Part of this decline is due to reduced research effort which lowers the total number of fish needed. Descaling, compared to last year, varied by species, increasing for yearling chinook and clipped and unclipped steelhead, decreasing for coho and sockeye, and remaining about the same for subyearling chinook. Descaling was well below the average for the airlift years for all species except unclipped steelhead. This may be a function of unclipped hatchery steelhead being counted as unclipped steelhead, a category traditionally reserved for wild steelhead. Mortality continues to be low, at or below last year's levels for yearling chinook, subyearling chinook, clipped steelhead and sockeye; slightly higher than last year for unclipped steelhead and coho. With the exception of sockeye, mortality rates at the new facility are well below the average for the years of sampling with the airlift system. The spring migrants generally started migrating later and finished earlier, for a shorter overall duration. Sub-yearling chinook did just the opposite, starting earlier and ending later for a longer middle 80% duration. This was the fourth year of index level sampling at the Hamilton Island Juvenile Monitoring Facility at Bonneville. The number of fish handled declined from 85,552 last year to 80,303 this year. Descaling for all species was similar to the previous two years (within 2%) but in all cases lower than the historical average. Mortality was lower than last year for all species, and below 1% for all species except sockeye (1.9%). Passage timing and duration was similar to last year for all species. A total of 5,542 fish were handled in the first powerhouse for condition monitoring and gas bubble exams. Fish condition was good, with descaling and mortality below last year's levels for all species. Powerhouse 2 operational priority reduced operation of PH1 again this year especially in midsummer as river flow declined. This prompted a 31 July end to a season that was scheduled to go through August. After 23 June exams for gas bubble trauma symptoms were conducted in the Juvenile Monitoring Facility. A total of 3,473 fish were examined and only one fish with bubbles was observed.

  19. Global tree network for computing structures enabling global processing operations

    DOE Patents [OSTI]

    Blumrich; Matthias A.; Chen, Dong; Coteus, Paul W.; Gara, Alan G.; Giampapa, Mark E.; Heidelberger, Philip; Hoenicke, Dirk; Steinmacher-Burow, Burkhard D.; Takken, Todd E.; Vranas, Pavlos M.

    2010-01-19

    A system and method for enabling high-speed, low-latency global tree network communications among processing nodes interconnected according to a tree network structure. The global tree network enables collective reduction operations to be performed during parallel algorithm operations executing in a computer structure having a plurality of the interconnected processing nodes. Router devices are included that interconnect the nodes of the tree via links to facilitate performance of low-latency global processing operations at nodes of the virtual tree and sub-tree structures. The global operations performed include one or more of: broadcast operations downstream from a root node to leaf nodes of a virtual tree, reduction operations upstream from leaf nodes to the root node in the virtual tree, and point-to-point message passing from any node to the root node. The global tree network is configurable to provide global barrier and interrupt functionality in asynchronous or synchronized manner, and, is physically and logically partitionable.

  20. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2004-2005 Annual Report.

    SciTech Connect (OSTI)

    Martinson, Rick D.; Kamps, Jeffrey W.; Kovalchuk, Gregory M.

    2005-02-02

    The 2004 river flows were near or below the historical average for each month of the fish passage season (Mar-Oct) at John Day and Bonneville. These flow levels provided average migration conditions for juvenile salmonids, comparable to 2003. The number of fish handled at John Day increased from 166,209 in 2003 to 412,797 in 2004. This dramatic increase is due entirely to an increased sample rate to get fish for researchers, from an average of 8.5% last year to 18.5% this year. In the spring, 83% of fish sampled were for research, and in the fall, 92% were for research. Unusually small subyearling Chinook, on average 10 millimeters shorter than last year, made meeting the 110 mm fork length or 13 gram requirement difficult. Consequently, we had to sample even more fish to get the number required by researchers. Passage timing at John Day was similar to previous years, with the 10% and 90% dates within a week of last year for all species. Descaling was lower than last year for all species except sockeye and below the historical average for all species. At 5.4%, sockeye descaling was 2% higher than any other species. Mortality, while up from last year for all species and higher than the historical average for all species except sockeye, continued to be low, below 1% for all species. The number of fish sampled at Bonneville was five and one half times the number sampled last year, from 80,687 to 444,580. Like John Day, this increase resulted from research fish collections. Passage timing at Bonneville was early for spring migrants, with record early 10%, 50%, and 90% dates for yearling Chinook, unclipped steelhead, and coho. Clipped steelhead also passed Bonneville earlier than normal, with record early 50% and 90% dates and only missing the 10% date by two days. Sockeye were the exception this year with the 10% date only a couple of days different than the 50% date for three previous years and the latest 90% date of any year, except of 2001. The middle 80% of the yearling Chinook and unclipped steelhead runs took longer to pass Bonneville than any previous year, at 44 and 45 days, respectively. For subyearling Chinook, the middle 80% of the fish passed during the last three weeks of June and the first week of July, taking 35 days to pass the project, the same as last year. Descaling for all species was slightly higher than the average of the last five years. Compared to last year, descaling varied by species, increasing for yearling Chinook, coho, and sockeye and lower for subyearling Chinook and steelhead. Since sampling began in the juvenile monitoring facility, descaling has been quite consistent, staying below 3.6% for yearling and subyearling Chinook, unclipped steelhead and coho, and above 4.7% for clipped steelhead and sockeye. Mortality was slightly higher than last year and the historical average for yearling and subyearling Chinook and steelhead. Coho and sockeye mortality was lower than last year and the historical average. Mortality for all species was below 1%. Powerhouse 2 operational priority and research results showing higher survival of fish passing through the PH1 turbines rather than through the bypass system resulted in a complete disuse of the PH1 bypass system. Consequently, we removed the historic PH1 data from this report and refer readers to any prior report for information regarding first powerhouse fish sampling.

  21. Operation of Glen Canyon Dam. Final environmental impact statement, summary, comments and responses

    SciTech Connect (OSTI)

    1995-03-01

    The Federal action considered in this environmental impact statement (EIS) is the operation of Glen Canyon Dam, Colorado River Storage Project (CRSP), Arizona. The purpose of the reevaluation is to determine specific options that could be implemented to minimize--consistent with law-adverse impacts on the downstream environmental and cultural resources, as well as Native American interests in Glen and Grand Canyons.

  22. ARM - AMF2 Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and Contacts Management and Operations Operations Overview ARM Links BCR | ECR ECO, EWO Extraview PIF, CAR, DQR & DQPR Operations Status System i.arm.gov AMF2 Deployment...

  1. Perspective: Towards environmentally acceptable criteria for downstream fish passage through mini hydro and irrigation infrastructure in the Lower Mekong River Basin

    SciTech Connect (OSTI)

    Baumgartner, Lee J.; Deng, Zhiqun; Thorncraft, Garry; Boys, Craig A.; Brown, Richard S.; Singhanouvong, Douangkham; Phonekhampeng, Oudom

    2014-02-26

    Tropical rivers have high annual discharges optimal for hydropower and irrigation development. The Mekong River is one of the largest tropical river systems, supporting a unique mega-diverse fish community. Fish are an important commodity in the Mekong, contributing a large proportion of calcium, protein, and essential nutrients to the diet of the local people and providing a critical source of income for rural households. Many of these fish migrate not only upstream and downstream within main-channel habitats but also laterally into highly productive floodplain habitat to both feed and spawn. Most work to date has focused on providing for upstream fish passage, but downstream movement is an equally important process to protect. Expansion of hydropower and irrigation weirs can disrupt downstream migrations and it is important to ensure that passage through regulators or mini hydro systems is not harmful or fatal. Many new infrastructure projects (<6 m head) are proposed for the thousands of tributary streams throughout the Lower Mekong Basin and it is important that designs incorporate the best available science to protect downstream migrants. Recent advances in technology have provided new techniques which could be applied to Mekong fish species to obtain design criteria that can facilitate safe downstream passage. Obtaining and applying this knowledge to new infrastructure projects is essential in order to produce outcomes that are more favorable to local ecosystems and fisheries.

  2. National Idling Reduction Network News - December 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... provider of pre- and post-production mill services for the steel industry, is set to receive a ... Delaware Iowa* Minnesota New Mexico Rhode Island Washington States in ...

  3. National Idling Reduction Network News - December 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Travel Plaza, 20 plug-ins); Parma, Michigan (Parma Travel Center, 24 plug- ins); Springer, New Mexico (Russell's Truck and Travel, 24 plug-ins and 4 TRU connections); Canton, ...

  4. National Idling Reduction Network News - August 2009

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    09 SOLICITATIONS FOR FUNDING AND AWARDS Red text indicates a new entry since last month. Organization Project Funding Deadline Website Allegheny County (Pennsylvania) Health ...

  5. National Idling Reduction Network News - April 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 SOLICITATIONS FOR FUNDING AND AWARDS Brown text indicates a new entry, or updated information, since last month. ORGANIZATION PROJECT FUNDING DEADLINE WEBSITE California Air ...

  6. National Idling Reduction Network News - August 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... technology for the inspection of trucks traveling at highway speeds; with this technology, ... Any new entry this month is shown in the costs and benefits of paying for and installing ...

  7. National Idling Reduction Network News - November 2009

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Information sought includes: truck drivers' parking habits and preferences while traveling ... Here are a few sites that determine the cost and benefits of installing and paying for ...

  8. National Idling Reduction Network News - September 2009

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    009 SOLICITATIONS FOR FUNDING AND AWARDS Red text indicates a new entry since last month. Organization Project Funding Deadline Website Allegheny County (Pennsylvania) Health ...

  9. National Idling Reduction Network News - May 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 SOLICITATIONS FOR FUNDING AND AWARDS Brown text indicates a new entry, or updated information, since last month. ORGANIZATION PROJECT FUNDING DEADLINE WEBSITE Bay Area Air ...

  10. National Idling Reduction Network News - July 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 SOLICITATIONS FOR FUNDING AND AWARDS Brown text indicates a new entry, or updated information, since last month. ORGANIZATION PROJECT FUNDING DEADLINE WEBSITE California Air ...

  11. National Idling Reduction Network News - April 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...transairprogramsi dlingNCTCOG2012CleanDieselCFP.asp San Joaquin Valley Air Pollution Control District (California) Locomotive Program (implementation of emissions ...

  12. National Idling Reduction Network News - January 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...small-business- environmental-improvement-loan- program.html San Joaquin Valley Air Pollution Control District (SJVAPCD) SJVAPCD Hybrid Truck and Bus Voucher Incentive Project ...

  13. National Idling Reduction Network News - June 2009

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schools, the Heinz Endowments, Clean Water Action, Group Against Smog and Pollution, and the Clean Air Task Force Pittsburgh Healthy School Bus Fund 500,000 Rolling deadline until ...

  14. National Idling Reduction Network News - March 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    www.baaqmd.gov?scitemid08F9 594F-BF34-4A2A-BD38- 9A3D0CCFF8F8 San Diego County Air Pollution Control District (SDAPCD) Carl Moyer Program 1.4 million First come, first served ...

  15. National Idling Reduction Network News - February 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 31, 2013 www.csswebform.orgwebformTSE RebateInfo.aspx San Diego County Air Pollution Control District (SDAPCD) Carl Moyer Program 1.4 million First come, first served ...

  16. National Idling Reduction Network News - February 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...small-business- environmental-improvement-loan- program.html San Joaquin Valley Air Pollution Control District (SJVAPCD) SJVAPCD Hybrid Truck and Bus Voucher Incentive Project ...

  17. National Idling Reduction Network News - August 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2013 2 ORGANIZATION PROJECT FUNDING DEADLINE WEBSITE San Joaquin Valley Air Pollution Control District (SJVAPCD) SJVAPCD Hybrid Truck and Bus Voucher Incentive Project ...

  18. National Idling Reduction Network News - July 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    deadline until funds are awarded. http:www.dep.state.fl.usairemissionm scdieselemission.htm Minnesota Pollution Control Agency Small Business APU Loan Program 192,000 ...

  19. National Idling Reduction Network News - October 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...small-business-auxiliary- power-unit-apu-loan-program.html San Joaquin Valley Air Pollution Control District (SJVAPCD) SJVAPCD Hybrid Truck and Bus Voucher Incentive Project ...

  20. National Idling Reduction Network News - June 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3, 2011 http:www07.grants.govsearchsearch.do? &modeVIEW&oppId101073 San Diego Air Pollution Control District (California) Goods Movement Emission Reduction Program: ...

  1. National Idling Reduction Network News - March 2014

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...small-business- environmental-improvement-loan- program.html San Joaquin Valley Air Pollution Control District (SJVAPCD) SJVAPCD Hybrid Truck and Bus Voucher Incentive Project ...

  2. National Idling Reduction Network News - May 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    deadline until funds are awarded. http:www.dep.state.fl.usairemissionm scdieselemission.htm Minnesota Pollution Control Agency Small Business Auxiliary Power Unit (APU) ...

  3. National Idling Reduction Network News - October 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...www.baaqmd.gov?scitemid08F9594 F-BF34-4A2A-BD38-9A3D0CCFF8F8 San Diego County Air Pollution Control District (SDAPCD) Carl Moyer Program 2.2 million First come, first ...

  4. National Idling Reduction Network News - November 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...www.pca.state.mn.usindex. phpairair-quality-and- pollutantsgeneral-air- qualitymotor-vehicle- pollutiongrantsfinancial- assistance-for-clean-diesel- projects.html U.S. ...

  5. National Idling Reduction Network News - December 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...small-business- environmental-improvement-loan- program.html San Joaquin Valley Air Pollution Control District (SJVAPCD) SJVAPCD Hybrid Truck and Bus Voucher Incentive Project ...

  6. National Idling Reduction Network News - January 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schools, the Heinz Endowments, Clean Water Action, Group Against Smog and Pollution, and the Clean Air Task Force Pittsburgh Healthy School Bus Fund 500,000 Rolling deadline until ...

  7. National Idling Reduction Network News - September 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schools, the Heinz Endowments, Clean Water Action, Group Against Smog and Pollution, and the Clean Air Task Force Pittsburgh Healthy School Bus Fund 500,000 Rolling deadline until ...

  8. National Idling Reduction Network News - June 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    deadline until funds are awarded. http:www.dep.state.fl.usairemissionm scdieselemission.htm Minnesota Pollution Control Agency Small Business APU Loan Program 192,000 ...

  9. National Idling Reduction Network News - July 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of every month. turnyourengineoff.orgcampaignreco gnition.html San Joaquin Valley Air Pollution Control District (SJVACPCD) SJVAPCD HVIP Plus-up Voucher Funding Program 804,000 ...

  10. National Idling Reduction Network News - August 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schools, the Heinz Endowments, Clean Water Action, Group Against Smog and Pollution, and the Clean Air Task Force Pittsburgh Healthy School Bus Fund 500,000 Rolling deadline until ...

  11. National Idling Reduction Network News - February 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schools, the Heinz Endowments, Clean Water Action, Group Against Smog and Pollution, and the Clean Air Task Force Pittsburgh Healthy School Bus Fund 500,000 Rolling deadline until ...

  12. National Idling Reduction Network News - April 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schools, the Heinz Endowments, Clean Water Action, Group Against Smog and Pollution, and the Clean Air Task Force Pittsburgh Healthy School Bus Fund 500,000 Rolling deadline until ...

  13. National Idling Reduction Network News - February 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    deadline until funds are awarded. http:www.dep.state.fl.usairemissionmsc dieselrebate.htm Minnesota Pollution Control Agency Small Business Auxiliary Power Unit (APU) ...

  14. National Idling Reduction Network News - October 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schools, the Heinz Endowments, Clean Water Action, Group Against Smog and Pollution, and the Clean Air Task Force Pittsburgh Healthy School Bus Fund 500,000 Rolling deadline until ...

  15. National Idling Reduction Network News - March 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schools, the Heinz Endowments, Clean Water Action, Group Against Smog and Pollution, and the Clean Air Task Force Pittsburgh Healthy School Bus Fund 500,000 Rolling deadline until ...

  16. National Idling Reduction Network News - March 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    deadline until funds are awarded. http:www.dep.state.fl.usairemissionmscdie selrebate.htm Minnesota Pollution Control Agency Small Business Auxiliary Power Unit (APU) ...

  17. National Idling Reduction Network News - September 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...small-business-auxiliary- power-unit-apu-loan-program.html San Joaquin Valley Air Pollution Control District (SJVAPCD) SJVAPCD Hybrid Truck and Bus Voucher Incentive Project ...

  18. National Idling Reduction Network News - November 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pittsburgh Public Schools, the Heinz Endowments, Clean Water Action, Group Against Smog and Pollution, and the Clean Air Task Force (800) 444-5791 Pittsburgh Healthy School Bus ...

  19. National Idling Reduction Network News - November 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...small-business- environmental-improvement-loan- program.html San Joaquin Valley Air Pollution Control District (SJVAPCD) SJVAPCD Hybrid Truck and Bus Voucher Incentive Project ...

  20. National Idling Reduction Network News - September 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ...egies-for-a-Sustainable-Multi- Modal-Transportation-Network.aspx San Joaquin Valley Air Pollution Control District Technology Advancement Program (TAP) Demonstration Projects 4 ...

  1. National Idling Reduction Network News - December 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schools, the Heinz Endowments, Clean Water Action, Group Against Smog and Pollution, and the Clean Air Task Force Pittsburgh Healthy School Bus Fund 500,000 Rolling deadline until ...

  2. National Idling Reduction Network News - January 2009

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... There are exemptions to the bylaw for such vehicles as emergency vehicles, taxis carrying passengers between November 1 and March 31, hybrid or electric cars, vehicles stopped in ...

  3. National Idling Reduction Network News - June 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... school buses 17,558 Huber Heights City Schools (Montgomery County, Ohio) Ohio EPA ... heat, and 120-V electricity for computers, televisions, and other hotel needs. ...

  4. National Idling Reduction Network News - March 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... workers at eight underground (nonmetal) mining facilities where diesel equipment is ... and abroad, and to people living in urban areas where diesel exhaust levels are elevated." ...

  5. National Idling Reduction Network News - June 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Massachusetts) MassDEP Purchase and installation of 1 APU and retrofit device 11,165 Porter-Cooler Rentals (Swansea, Massachusetts) MassDEP Purchase and installation of 3 eTRUS ...

  6. National Idling Reduction Network News - May 2013

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Protection Agency (EPA) Illinois Clean Diesel Grant Program 294,517 Rolling deadline until funds are awarded. illinoisgreenfleets.org Illinois EPA Illinois Clean Diesel ...

  7. National Idling Reduction Network News - July 2009

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Heads off to Greener Pastures Mitch Greenberg, who has led the EPA SmartWay Transport ... Sources: Mitch Greenberg and Annie Kee, EPA SmartWay RECURRING FEATURES How to Find Back ...

  8. National Idling Reduction Network News - February 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 SOLICITATIONS FOR FUNDING AND AWARDS Brown text indicates a new entry, or updated information, since last month. ORGANIZATION PROJECT FUNDING DEADLINE WEBSITE Bay Area Air ...

  9. National Idling Reduction Network News - January 2010

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    January 2010 SOLICITATIONS FOR FUNDING AND AWARDS Brown text indicates a new entry since last month. ORGANIZATION PROJECT FUNDING DEADLINE WEBSITE California Air Resources Board ...

  10. National Idling Reduction Network News - August 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 SOLICITATIONS FOR FUNDING AND AWARDS Brown text indicates a new entry, or updated information, since last month. ORGANIZATION PROJECT FUNDING DEADLINE WEBSITE Bay Area Air ...

  11. National Idling Reduction Network News - October 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 SOLICITATIONS FOR FUNDING AND AWARDS Brown text indicates a new entry, or updated information, since last month. ORGANIZATION PROJECT FUNDING DEADLINE WEBSITE Bay Area Air ...

  12. National Idling Reduction Network News - January 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 SOLICITATIONS FOR FUNDING AND AWARDS Brown text indicates a new entry, or updated information, since last month. ORGANIZATION PROJECT FUNDING DEADLINE WEBSITE Bay Area Air ...

  13. National Idling Reduction Network News - November 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 SOLICITATIONS FOR FUNDING AND AWARDS Brown text indicates a new entry since last month. ORGANIZATION PROJECT FUNDING DEADLINE WEBSITE Alabama Department of Environmental ...

  14. National Idling Reduction Network News - July 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    July 2012 SOLICITATIONS FOR FUNDING AND AWARDS Brown text indicates a new entry, or updated information, since last month. ORGANIZATION PROJECT FUNDING DEADLINE WEBSITE Bay Area ...

  15. National Idling Reduction Network News - May 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 SOLICITATIONS FOR FUNDING AND AWARDS Brown text indicates a new entry, or updated information, since last month. ORGANIZATION PROJECT FUNDING DEADLINE WEBSITE California Air ...

  16. National Idling Reduction Network News - September 2011

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 SOLICITATIONS FOR FUNDING AND AWARDS Brown text indicates a new entry, or updated information, since last month. ORGANIZATION PROJECT FUNDING DEADLINE WEBSITE Bay Area Air ...

  17. National Idling Reduction Network News - December 2009

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    December 2009 SOLICITATIONS FOR FUNDING AND AWARDS Red text indicates a new entry since last month. Organization Project Funding Deadline Website California Air Resources Board ...

  18. EnergySolution's Clive Disposal Facility Operational Research Model - 13475

    SciTech Connect (OSTI)

    Nissley, Paul; Berry, Joanne

    2013-07-01

    EnergySolutions owns and operates a licensed, commercial low-level radioactive waste disposal facility located in Clive, Utah. The Clive site receives low-level radioactive waste from various locations within the United States via bulk truck, containerised truck, enclosed truck, bulk rail-cars, rail boxcars, and rail inter-modals. Waste packages are unloaded, characterized, processed, and disposed of at the Clive site. Examples of low-level radioactive waste arriving at Clive include, but are not limited to, contaminated soil/debris, spent nuclear power plant components, and medical waste. Generators of low-level radioactive waste typically include nuclear power plants, hospitals, national laboratories, and various United States government operated waste sites. Over the past few years, poor economic conditions have significantly reduced the number of shipments to Clive. With less revenue coming in from processing shipments, Clive needed to keep its expenses down if it was going to maintain past levels of profitability. The Operational Research group of EnergySolutions were asked to develop a simulation model to help identify any improvement opportunities that would increase overall operating efficiency and reduce costs at the Clive Facility. The Clive operations research model simulates the receipt, movement, and processing requirements of shipments arriving at the facility. The model includes shipment schedules, processing times of various waste types, labor requirements, shift schedules, and site equipment availability. The Clive operations research model has been developed using the WITNESS{sup TM} process simulation software, which is developed by the Lanner Group. The major goals of this project were to: - identify processing bottlenecks that could reduce the turnaround time from shipment arrival to disposal; - evaluate the use (or idle time) of labor and equipment; - project future operational requirements under different forecasted scenarios. By identifying processing bottlenecks and unused equipment and/or labor, improvements to operating efficiency could be determined and appropriate cost saving measures implemented. Model runs forecasting various scenarios helped illustrate potential impacts of certain conditions (e.g. 20% decrease in shipments arrived), variables (e.g. 20% decrease in labor), or other possible situations. (authors)

  19. Operating Experience Committee Charter

    Broader source: Energy.gov [DOE]

    The Operating Experience Committee (OEC) charter provides a description of the OEC's purpose, background, membership, functions, and operations.

  20. Annual radiological environmental operating report: Browns Ferry Nuclear Plant, 1992. Operations Services/Technical Programs

    SciTech Connect (OSTI)

    Not Available

    1993-04-01

    This report describes the environmental radiological monitoring program conducted by TVA in the vicinity of Browns Ferry Nuclear Plant (BFN) in 1992. The program includes the collection of samples from the environment and the determination of the concentrations of radioactive materials in the samples. Samples are taken from stations in the general area of the plant and from areas not influenced by plant operations. Station locations are selected after careful consideration of the weather patterns and projected radiation doses to the various areas around the plant. Material sampled includes air, water, milk, foods, vegetation, soil, fish, sediment, and direct radiation levels. Results from stations near the plant are compared with concentrations from control stations and with preoperational measurements to determine potential impacts of plant operations. Small amounts of Co-60 and Cs-134 were found in sediment samples downstream from the plant. This activity in stream sediment would result in no measurable increase over background in the dose to the general public.

  1. Feasibility Study for Evaluating Cumulative Exposure of Downstream Migrant Juvenile Salmonids to Total Dissolved Gas. Final Report 1996.

    SciTech Connect (OSTI)

    Abernethy, C.Scott; Dauble, Dennis D.; Johnson, Robert L.

    1997-11-01

    A feasibility study was initiated to determine if downstream migrant salmonids could be monitored to determine potential relationships between total dissolved gas (TDG) exposure and signs of gas bubble trauma (GBT). The primary objectives were to: (1) establish logistical requirements for in-river monitoring of TDG exposure, including net pen design, deployment, and navigation constraints; (2) resolve uncertainties associated with effects of the net pen on fish behavior; (3) test the accuracy and precision of in-river monitoring equipment used to measure fish distribution and water quality; and (4) determine the application of hydrologic/flow models to predictions of TDG exposure. In-river measurements included water velocity, boat position, and selected water quality parameters (temperature, dissolved oxygen, pH, depth, conductivity). Fish distribution within the net pen was monitored using scanning sonar, and a split-beam echo sounder was used to evaluate vertical distribution of fish m in the river adjacent to the net pen. Three test drifts were conducted from late July through late August. The studies demonstrated that it was feasible to assemble and deploy a large net pen for mobile monitoring of TDG exposure. Accurate monitoring of vertical and lateral distribution of smolts was performed, and diel differences in behavior were documented. Further, the fish sounded in response to researcher activity on the perimeter platform. Thus, in-transit monitoring for GBT or mortality would affect fish depth distribution and exposure to TDG. Principal recommendations for future studies are directed at improving maneuverability of the net pen in adverse weather conditions and applying new acoustics technology to simultaneously collect fish distribution data from within and outside of the pen. 6 refs., 17 figs., 2 tabs.

  2. ARM - NSA Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AlaskaNSA Operations NSA Related Links Facilities and Instruments Barrow Atqasuk Oliktok Point (AMF3) ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site...

  3. Crane Operation Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Crane Operational Training Crane Operational Safety Test NOTE: All Training and Testing Material is for LSU CAMD Users ONLY Crane Training - Information Reduces Risk Crane...

  4. Energy Consumption of Die Casting Operations

    SciTech Connect (OSTI)

    Jerald Brevick; clark Mount-Campbell; Carroll Mobley

    2004-03-15

    Molten metal processing is inherently energy intensive and roughly 25% of the cost of die-cast products can be traced to some form of energy consumption [1]. The obvious major energy requirements are for melting and holding molten alloy in preparation for casting. The proper selection and maintenance of melting and holding equipment are clearly important factors in minimizing energy consumption in die-casting operations [2]. In addition to energy consumption, furnace selection also influences metal loss due to oxidation, metal quality, and maintenance requirements. Other important factors influencing energy consumption in a die-casting facility include geographic location, alloy(s) cast, starting form of alloy (solid or liquid), overall process flow, casting yield, scrap rate, cycle times, number of shifts per day, days of operation per month, type and size of die-casting form of alloy (solid or liquid), overall process flow, casting yield, scrap rate, cycle times, number of shifts per day, days of operation per month, type and size of die-casting machine, related equipment (robots, trim presses), and downstream processing (machining, plating, assembly, etc.). Each of these factors also may influence the casting quality and productivity of a die-casting enterprise. In a die-casting enterprise, decisions regarding these issues are made frequently and are based on a large number of factors. Therefore, it is not surprising that energy consumption can vary significantly from one die-casting enterprise to the next, and within a single enterprise as function of time.

  5. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Idle Reduction Weight Exemption Any vehicle equipped with qualifying idle reduction technology may exceed the state's gross vehicle weight limits by up to 400 pounds to compensate for the additional weight of the idle reduction technology. Upon request, vehicle operators must provide proof that the idle reduction technology is fully functional. (Reference Texas Statutes, Transportation Code 622.955

  6. Operation Warfighter Internship Fair

    Broader source: Energy.gov [DOE]

    Attendees: Participants of Operation Warfighter Program Cost: Free Supports: Veteran and Disability Employment Programs

  7. Operating Experience Committee Charter

    Broader source: Energy.gov [DOE]

    The Operating Experience Committe Charter explains the purpose of the Department of Energy (DOE) Operating Experience Committee (OEC), which is to support line management within DOE and the DOE community in developing and sustaining effective oeprating experience programs so that lessons from inernal and external operating experience lead to improvement in future operational and safety performance.

  8. ARM - SGP Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations SGP Related Links Virtual Tour Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Summer Training SGP Fact Sheet Images Information for Guest Scientists Contacts SGP Operations Routine Operations SGP central facility offices. SGP central facility offices. The overwhelming majority of the measurements

  9. Sluiceway Operations to Pass Juvenile Salmonids at The Dalles Dam, Columbia River, USA

    SciTech Connect (OSTI)

    Johnson, Gary E.; Khan, Fenton; Skalski, J. R.; Klatte, Bernard A.

    2013-11-20

    Existing ice and trash sluiceways are commonly used to pass juvenile salmonids downstream at hydropower dams through a benign, non-turbine route. At The Dalles Dam on the Columbia River, managers undertook optimizing operations of sluiceway weirs to maximize survival of juvenile salmonids at the powerhouse. We applied fixed-location hydroacoustic methods to compare fish passage rates and sluiceway efficiencies for two weir configurations during 2004 and 2005: three weirs versus six weirs, located at the mid- versus east powerhouse, respectively. We also analyzed horizontal distributions of passage at the sluiceway and turbines and the effects of operating turbines beneath open sluiceway gates to provide supporting data relevant to operations optimization. Based on the findings, we recommend the following for long-term operations for the sluiceway at The Dalles Dam: open six rather than three sluiceway weirs to take advantage of the maximum hydraulic capacity of the sluiceway; open the three weirs above the western-most operating main turbine unit (MU) and the three weirs at MU 8 where turbine passage rates are relatively high; operate the turbine units below open sluiceway weirs as a standard procedure; operate the sluiceway 24 h/d year-round to maximize its benefits to juvenile salmonids; and use the same operations for spring and summer emigrants. These operational concepts are transferable to dams where sluiceway surface flow outlets are used protect downstream migrating fishes.

  10. A review of proposed Glen Canyon Dam interim operating criteria

    SciTech Connect (OSTI)

    LaGory, K.; Hlohowskyj, I.; Tomasko, D.; Hayse, J.; Durham, L.

    1992-04-01

    Three sets of interim operating criteria for Glen Canyon Dam on the Colorado River have been proposed for the period of November 1991, to the completion of the record of decision for the Glen Canyon Dam environmental impact statement (about 1993). These criteria set specific limits on dam releases, including maximum and minimum flows, up-ramp and down-ramp rates, and maximum daily fluctuation. Under the proposed interim criteria, all of these parameters would be reduced relative to historical operating criteria to protect downstream natural resources, including sediment deposits, threatened and endangered fishes, trout, the aquatic food base, and riparian plant communities. The scientific bases of the three sets of proposed operating criteria are evaluated in the present report:(1) criteria proposed by the Research/Scientific Group, associated with the Glen Canyon Environmental Studies (GCES); (2) criteria proposed state and federal officials charged with managing downstream resources; and (3) test criteria imposed from July 1991, to November 1991. Data from Phase 1 of the GCES and other sources established that the targeted natural resources are affected by dam operations, but the specific interim criteria chosen were not supported by any existing studies. It is unlikely that irreversible changes to any of the resources would occur over the interim period if historical operating criteria remained in place. It is likely that adoption of any of the sets of proposed interim operating criteria would reduce the levels of sediment transport and erosion below Glen Canyon Dam; however, these interim criteria could result in some adverse effects, including the accumulation of debris at tributary mouths, a shift of new high-water-zone vegetation into more flood-prone areas, and further declines in vegetation in the old high water zone.

  11. Statistical evaluation of the effects of fall and winter flows on the spring condition of rainbow and brown trout in the green river downstream of Flaming Gorge Dam.

    SciTech Connect (OSTI)

    Magnusson, A. K.; LaGory, K. E.; Hayse, J. W.; Environmental Science Division

    2009-01-09

    Flaming Gorge Dam, a hydroelectric facility operated by the Bureau of Reclamation (Reclamation), is located on the Green River in Daggett County, northeastern Utah. In recent years, single peak releases each day or steady flows have been the operational pattern during the winter period. A double-peak pattern (two flow peaks each day) was implemented during the winter of 2006-2007 by Reclamation. Because there is no recent history of double-peaking at Flaming Gorge Dam, the potential effects of double-peaking operations on the body condition of trout in the dam's tailwater are not known. A study plan was developed that identified research activities to evaluate potential effects from double-peaking operations during winter months. Along with other tasks, the study plan identified the need to conduct a statistical analysis of existing data on trout condition and macroinvertebrate abundance to evaluate potential effects of hydropower operations. This report presents the results of this analysis. We analyzed historical data to (1) describe temporal patterns and relationships among flows, benthic macroinvertebrate abundance, and condition of brown trout (Salmo trutta) and rainbow trout (Oncorhynchus mykiss) in the tailwaters of Flaming Gorge Dam and (2) to evaluate the degree to which flow characteristics (i.e., flow volumes and flow variability) and benthic macroinvertebrate abundance affect the condition of trout in this area. This information, together with further analyses of size-stratified trout data, may also serve as baseline data to which the effects of potential future double-peaking flows can be compared. The condition (length, weight and/or relative weight) of rainbow trout (Oncorhynchus mykiss) at two sites in the Green River downstream of Flaming Gorge Dam (Tailrace and Little Hole) and weight of brown trout (Salmo trutta) at the Little Hole site has been decreasing since 1990 while the abundance of brown trout has been increasing at the two sites. At the same time, flow variability in the river has decreased and the abundance of total benthic macroinvertebrates at the Tailrace site has increased. The condition of trout in spring (averaged across all sampled trout) was positively correlated with fall and winter flow variability (including within-day skewness, within-season skewness and/or change in flow between days) at both locations. No negative correlations between trout condition and any measure of flow variability were detected. The length and weight of rainbow trout at the Little Hole site were negatively correlated with increasing fall and winter flow volume. The condition of brown trout at Little Hole and the condition of brown and rainbow trout at Tailrace were not correlated with flow volume. Macroinvertebrate variables during October were either positively correlated or not correlated with measures of trout condition at the Tailrace and Little Hole sites. With the exception of a positive correlation between taxa richness of macroinvertebrates in January and the relative weight of brown trout at Tailrace, the macroinvertebrate variables during January and April were either not correlated or negatively correlated with measures of trout condition. We hypothesize that high flow variability increased drift by dislodging benthic macroinvertebrates, and that the drift, in turn, resulted in mostly lower densities of benthic macroinvertebrates, which benefited the trout by giving them more feeding opportunities. This was supported by negative correlations between benthic macroinvertebrates and flow variability. Macroinvertebrate abundance (with the exception of ephemeropterans) was also negatively correlated with flow volume. The change in trout condition from fall to spring, as measured by the ratio of spring to fall relative weight, was evaluated to determine their usefulness as a standardized index to control for the initial condition of the fish as they enter the winter period. The ratio values were less correlated with the fall condition values than the spring condition values and did not show the same relationships to flows, to macroinvertebrates, or across years as the above-mentioned spring relative weight values. We found that the condition ratio of rainbow trout at Tailrace was positively correlated with within-day flow variability but was not correlated with flow volume, between-day-, or within-season flow variability. The condition ratios of rainbow trout at Little Hole and of both trout species at Tailrace were not correlated to any of the measured flow variables. The condition ratios of both trout species were positively correlated with the abundance of January benthic macroinvertebrates at the Little Hole site and with January dipterans (brown trout) or total coleopterans (rainbow trout) at the Tailrace site. The relationships among flows, macroinvertebrates, and trout condition were varied among species and locations.

  12. Emissions from Idling Heavy-Duty Trucks and Idling-Reduction Equipment |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Emission Testing of Washington Metropolitan Area Transit Authority (WMATA) Natural Gas and Diesel Transit Buses M. Melendez, J. Taylor, and J. Zuboy National Renewable Energy Laboratory W.S. Wayne West Virginia University D. Smith U.S. Department of Energy Technical Report NREL/TP-540-36355 December 2005 Emission Testing of Washington Metropolitan Area Transit Authority (WMATA) Natural Gas and Diesel Transit Buses M. Melendez, J. Taylor, and J. Zuboy National Renewable Energy Laboratory W.S.

  13. To Idle or Not to Idle: That is the Question | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Poster presented at the 16th Directions in Engine-Efficiency ... More Documents & Publications A High Temperature Direct Vehicle Exhaust Flowmeter for Heavy Duty Diesel Emission ...

  14. Reactivation of an idle lease to increase heavy oil recovery through application of conventional steam drive technology in a low dip slope and basin reservoir in the Midway-Sunset field, San Jaoquin Basin, California. Annual report, June 13, 1995--June 13, 1996

    SciTech Connect (OSTI)

    Deo, M.; Jenkins, C.; Sprinkel, D.; Swain, R.; Wydrinski, R.; Schamel, S.

    1998-09-01

    This project reactivates ARCO`s idle Pru Fee lease in the Midway-Sunset field, California and conducts a continuous steamflood enhanced oil recovery demonstration aided by an integration of modern reservoir characterization and simulation methods. Cyclic steaming is being used to reestablish baseline production within the reservoir characterization phase of the project. During the demonstration phase scheduled to begin in January 1997, a continuous steamflood enhanced oil recovery will be initiated to test the incremental value of this method as an alternative to cyclic steaming. Other economically marginal Class III reservoirs having similar producibility problems will benefit from insight gained in this project. The objectives of the project are: (1) to return the shut-in portion of the reservoir to optimal commercial production; (2) to accurately describe the reservoir and recovery process; and (3) to convey the details of this activity to the domestic petroleum industry, especially to other producers in California, through an aggressive technology transfer program.

  15. Climate Data Operators (CDO)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Climate Data Operators (CDO) Climate Data Operators (CDO) Description and Overview CDO is a large tool set for working on climate data. NetCDF 34, GRIB including SZIP compression, ...

  16. Polychlorinated Biphenyls (PCBs) in Catfish and Carp Collected from the Rio Grande Upstream and Downstream of Los Alamos National Laboratory: Revision 1

    SciTech Connect (OSTI)

    Gilbert J. Gonzales Philip R. Fresquez

    2008-05-12

    Concern has existed for years that the Los Alamos National Laboratory (LANL), a complex of nuclear weapons research and support facilities, has released polychlorinated biphenyls (PCBs) to the environment that may have reached adjacent bodies of water through canyons that connect them. In 1997, LANL's Ecology Group began measuring PCBs in fish in the Rio Grande upstream and downstream of ephemeral streams that cross LANL and later began sampling fish in Abiquiu and Cochiti reservoirs, which are situated on the Rio Chama and Rio Grande upstream and downstream of LANL, respectively. In 2002, we electroshocked channel catfish (Ictalurus punctatus) and common carp (Carpiodes carpio) in the Rio Grande upstream and downstream of LANL and analyzed fillets for PCB congeners. We also sampled soils along the Rio Chama and Rio Grande drainages to discern whether a background atmospheric source of PCBs that could impact surface water adjacent to LANL might exist. Trace concentrations of PCBs measured in soil (mean = 4.7E-05 {micro}g/g-ww) appear to be from background global atmospheric sources, at least in part, because the bimodal distribution of low-chlorinated PCB congeners and mid-chlorinated PCB congeners in the soil samples is interpreted to be typical of volatilized PCB congeners that are found in the atmosphere and dust from global fallout. Upstream catfish (n = 5) contained statistically (P = 0.047) higher concentrations of total PCBs (mean = 2.80E-02 {micro}g/g-ww) than downstream catfish (n = 10) (mean = 1.50E-02 {micro}g/g-ww). Similarly, upstream carp (n = 4) contained higher concentrations of total PCBs (mean = 7.98E-02 {micro}g/g-ww) than downstream carp (n = 4) (3.07E-02 {micro}g/g-ww); however, the difference was not statistically significant (P = 0.42). The dominant PCB homologue in all fish samples was hexachlorobiphenyls. Total PCB concentrations in fish in 2002 are lower than 1997; however, differences in analytical methods and other uncertainties exist. A review of historical quantitative PCB data for fish from the Rio Grande and Abiquiu and Cochiti reservoirs does not indicate a distinct contribution of PCBs from LANL to fish in the Rio Grande or Cochiti. Analysis of homologue patterns for fish does not provide sufficient evidence of a LANL contribution. Nevertheless, concentrations of PCBs in fillets of fish sampled from the Rio Grande are indicative of potential adverse chronic health impact from consumption of these fish on a long-term basis.

  17. Paducah Operations Timeline | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Timeline Paducah Operations Timeline Paducah Operations Timeline

  18. Calutron Operators | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operators Calutron Operators Young women recruited to operate the calutrons

  19. EIS-0351: Operation of Flaming Gorge Dam, Colorado River Storage Project, Colorado River, UT

    Broader source: Energy.gov [DOE]

    The Secretary of the United States Department of the Interior (Secretary), acting through the Bureau of Reclamation (Reclamation), is considering whether to implement a proposed action under which Flaming Gorge Dam would be operated to achieve the flow and temperature regimes recommended in the September 2000 report Flow and Temperature Recommendations for Endangered Fishes in the Green River Downstream of Flaming Gorge Dam (2000 Flow and Temperature Recommendations), published by the Upper Colorado River Endangered Fish Recovery Program (Recovery Program).

  20. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Idle Reduction Requirements A driver may not idle a motor vehicle for more than five minutes in a 60-minute period. This limit does not apply if the vehicle is operating an auxiliary power unit, generator set, or other mobile idle reduction technology. Additional exemptions apply. Additionally, all driver education courses must include instruction on the adverse environmental, health, economic, and other impacts of unnecessary idling and on the law governing idling of motor vehicles. (Reference

  1. Reactivation of an Idle Lease to Increase Heavy Oil Recovery through Application of Conventional Steam Drive Technology in a Low-Dip Slope and Reservoir in the Midway-Sunset Field, San Jaoquin Basin, California, Class III

    SciTech Connect (OSTI)

    Schamel, S.

    2001-01-09

    The objective of this project is not just to produce oil from the Pru Fee property, but rather to test which operational strategies best optimize total oil recovery at economically acceptable rates of production and production costs.

  2. Reactivation of an Idle Lease to Increase Heavy Oil Recovery through Application of Conventional Steam Drive Technology in a Low-Dip Slope and Reservoir in the Midway-Sunset Field, San Jaoquin Basin, California, Class III

    SciTech Connect (OSTI)

    Schamel, Steven; Deo, Milind; Deets, Mike

    2002-02-21

    The objective of the project is not just to commercially produce oil from the Pru Fee property, but rather to test which operational strategies best optimize total oil recovery at economically acceptable rates of production volumes and costs.

  3. Algal Testbed Public Private Partnerships Workshop on Principles and Processes: Algae Culture Management, Production and Downstream Harvesting

    Broader source: Energy.gov [DOE]

    The Spring 2016 ATP3 workshop will occur May 16th-20th at Santa Fe Community College (SFCC) and the Los Alamos National Lab's New Mexico Consortium (LANL NMC). These unique facilities will give participants incredible insights into aspects across the algae value chain and the food, energy and water nexus. Lectures will cover the fundamentals of managing microalgal cultures, culturing techniques, measuring and analyzing biomass, harvesting and processing technologies, as well as life cycle analysis and operations at the production scale. Participants will have opportunities to work in the laboratory and learn how to measure culture density (cell counting and optical density), use a light and fluorescence microscope, use flow cytometry, and perform gravimetric analyses (dry weight and ash-free dry weight), and techniques necessary to analyze biomass compounds.

  4. Cask fleet operations study

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The Nuclear Waste Policy Act of 1982 assigned to the Department of Energy's (DOE) Office of Civilian Waste Management the responsibility for disposing of high-level waste and spent fuel. A significant part of that responsibility involves transporting nuclear waste materials within the federal waste management system; that is, from the waste generator to the repository. The lead responsibility for transportation operations has been assigned to Oak Ridge Operations, with Oak Ridge National Laboratory (ORNL) providing technical support through the Transportation Operations Support Task Group. One of the ORNL support activities involves assessing what facilities, equipment and services are required to assure that an acceptable, cost-effective and safe transportation operations system can be designed, operated and maintained. This study reviews, surveys and assesses the experience of Nuclear Assurance Corporation (NAC) in operating a fleet of spent-fuel shipping casks to aid in developing the spent-fuel transportation system.

  5. Site Operator Program

    SciTech Connect (OSTI)

    Warren, J.F.

    1991-01-01

    Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

  6. Site Operator Program

    SciTech Connect (OSTI)

    Warren, J.F.

    1991-12-31

    Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

  7. Operating Experience Summaries

    Broader source: Energy.gov [DOE]

    The Office of Environment, Health, Safety and Security (AU) Office of Analysis publishes the Operating Experience Summary to exchange lessons-learned information between DOE facilities.

  8. TYPE OF OPERATION

    Office of Legacy Management (LM)

    & RESIDUE 0 AECMED INVOLVEME?JT AT SITE ...----------- Control a Health Physics Protection 0 AECfMED managed operations G Little or None 0 AEUMED respansible far C ...

  9. TYPE OF OPERATION

    Office of Legacy Management (LM)

    . .' .,Ec-itkED I' NVULVEFY l- AT SITE '---------... .Control c Health Physics Protection 0 AECMED managed operations G Little or None :kf AECMED responsible for ...

  10. TYPE OF OPERATION

    Office of Legacy Management (LM)

    operations G AECtlED responsible for acrountability . G I i I : I I 1 Health Physics; Protection ; c Little or, None, .c AECMED responsibility c Contractoi ...

  11. ARM - AAF Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2007 - UAV Campaigns 1993 - 2006, 2015 Other Aircraft Campaigns 1993 - 2010 AAF Contacts Rickey Petty DOE AAF Program Director Beat Schmid Technical Director AAF Operations...

  12. APS User Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Schedules APS Schedule Useful Links Beamline Design Library (former Design Exchange) Machine Status Link Bunch Clock Information APS Systems Status Storage Ring Operating Status...

  13. APS Operational Statistics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Downtime Log Yearly Operation Statistics 2016 Statistics 2015 Statistics 2014 Statistics 2013 Statistics 2012 Statistics 2011 Statistics 2010 Statistics 2009 Statistics 2008...

  14. Operator interface for vehicles

    DOE Patents [OSTI]

    Bissontz, Jay E

    2015-03-10

    A control interface for drivetrain braking provided by a regenerative brake and a non-regenerative brake is implemented using a combination of switches and graphic interface elements. The control interface comprises a control system for allocating drivetrain braking effort between the regenerative brake and the non-regenerative brake, a first operator actuated control for enabling operation of the drivetrain braking, and a second operator actuated control for selecting a target braking effort for drivetrain braking. A graphic display displays to an operator the selected target braking effort and can be used to further display actual braking effort achieved by drivetrain braking.

  15. Operations Committee Report

    Broader source: Energy.gov (indexed) [DOE]

    Presented to the Commission to Review Effectiveness of National Energy Laboratories Jeff Smith Deputy for Operations Oak Ridge National Laboratory February 24, 2015 The Importance ...

  16. ARM - Historical Operational Statistics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    For a complete description of hours for each site, please refer to the current ARM Climate Research Facility Operations Quarterly Report. The tables below provide the...

  17. ARM - AMF Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2009-2010 Shouxian, China, 2008 Black Forest, Germany, 2007 Niamey, Niger, 2006 Point Reyes, California, 2005 AMF Operations Members of the AMF1 installation team prepare the...

  18. Classification of US hydropower dams by their modes of operation

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    McManamay, Ryan A.; Oigbokie, II, Clement O.; Kao, Shih -Chieh; Bevelhimer, Mark S.

    2016-02-19

    A key challenge to understanding ecohydrologic responses to dam regulation is the absence of a universally transferable classification framework for how dams operate. In the present paper, we develop a classification system to organize the modes of operation (MOPs) for U.S. hydropower dams and powerplants. To determine the full diversity of MOPs, we mined federal documents, open-access data repositories, and internet sources. W then used CART classification trees to predict MOPs based on physical characteristics, regulation, and project generation. Finally, we evaluated how much variation MOPs explained in sub-daily discharge patterns for stream gages downstream of hydropower dams. After reviewingmore » information for 721 dams and 597 power plants, we developed a 2-tier hierarchical classification based on 1) the storage and control of flows to powerplants, and 2) the presence of a diversion around the natural stream bed. This resulted in nine tier-1 MOPs representing a continuum of operations from strictly peaking, to reregulating, to run-of-river, and two tier-2 MOPs, representing diversion and integral dam-powerhouse configurations. Although MOPs differed in physical characteristics and energy production, classification trees had low accuracies (<62%), which suggested accurate evaluations of MOPs may require individual attention. MOPs and dam storage explained 20% of the variation in downstream subdaily flow characteristics and showed consistent alterations in subdaily flow patterns from reference streams. Lastly, this standardized classification scheme is important for future research including estimating reservoir operations for large-scale hydrologic models and evaluating project economics, environmental impacts, and mitigation.« less

  19. DOWNSTREAM IMPACTS OF SLUDGE MASS REDUCTION VIA ALUMINUM DISSOLUTION ON DWPF PROCESSING OF SAVANNAH RIVER SITE HIGH LEVEL WASTE - 9382

    SciTech Connect (OSTI)

    Pareizs, J; Cj Bannochie, C; Michael Hay, M; Daniel McCabe, D

    2009-01-14

    The SRS sludge that was to become a major fraction of Sludge Batch 5 (SB5) for the Defense Waste Processing Facility (DWPF) contained a large fraction of H-Modified PUREX (HM) sludge, containing a large fraction of aluminum compounds that could adversely impact the processing and increase the vitrified waste volume. It is beneficial to reduce the non-radioactive fraction of the sludge to minimize the number of glass waste canisters that must be sent to a Federal Repository. Removal of aluminum compounds, such as boehmite and gibbsite, from sludge can be performed with the addition of NaOH solution and heating the sludge for several days. Preparation of SB5 involved adding sodium hydroxide directly to the waste tank and heating the contents to a moderate temperature through slurry pump operation to remove a fraction of this aluminum. The Savannah River National Laboratory (SRNL) was tasked with demonstrating this process on actual tank waste sludge in our Shielded Cells Facility. This paper evaluates some of the impacts of aluminum dissolution on sludge washing and DWPF processing by comparing sludge processing with and without aluminum dissolution. It was necessary to demonstrate these steps to ensure that the aluminum removal process would not adversely impact the chemical and physical properties of the sludge which could result in slower processing or process upsets in the DWPF.

  20. Stirling machine operating experience

    SciTech Connect (OSTI)

    Ross, B.; Dudenhoefer, J.E.

    1991-01-01

    Numerous Stirling machines have been built and operated, but the operating experience of these machines is not well known. It is important to examine this operating experience in detail, because it largely substantiates the claim that Stirling machines are capable of reliable and lengthy lives. The amount of data that exists is impressive, considering that many of the machines that have been built are developmental machines intended to show proof of concept, and were not expected to operate for any lengthy period of time. Some Stirling machines (typically free-piston machines) achieve long life through non-contact bearings, while other Stirling machines (typically kinematic) have achieved long operating lives through regular seal and bearing replacements. In addition to engine and system testing, life testing of critical components is also considered.

  1. Stirling machine operating experience

    SciTech Connect (OSTI)

    Ross, B.; Dudenhoefer, J.E.

    1994-09-01

    Numerous Stirling machines have been built and operated, but the operating experience of these machines is not well known. It is important to examine this operating experience in detail, because it largely substantiates the claim that stirling machines are capable of reliable and lengthy operating lives. The amount of data that exists is impressive, considering that many of the machines that have been built are developmental machines intended to show proof of concept, and are not expected to operate for lengthy periods of time. Some Stirling machines (typically free-piston machines) achieve long life through non-contact bearings, while other Stirling machines (typically kinematic) have achieved long operating lives through regular seal and bearing replacements. In addition to engine and system testing, life testing of critical components is also considered. The record in this paper is not complete, due to the reluctance of some organizations to release operational data and because several organizations were not contacted. The authors intend to repeat this assessment in three years, hoping for even greater participation.

  2. Operational Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operational Management Operational Management Operational Management Leadership Contact Information Office of Resource Management and Planning U.S. Department of Energy, MA-1.1 ...

  3. NERSC Operational Assessment Review

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NERSC Operational Assessment Review Agenda and Logistics Home » Events » HPC Workshops » NERSC Operational Assessment Review NERSC Operational Assessment Review By invitation only. Agenda TUESDAY, FEBRUARY 16 8am - Coffee and Pastries 8:15am: Welcome and logistics - Katie Antypas 8:20am: Welcome and DOE charge - Dave Goodwin 8:30am - 9:15am:Year in Review - Sudip Dosanjh 9:30am - 10:30am: User Results - Katie Antypas 10:45 - 11:am: Break 11:00-11:45: Science and Strategic Results - Richard

  4. Operations & Administration - JCAP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Heat & Cool » Heat Pump Systems » Operating and Maintaining Your Heat Pump Operating and Maintaining Your Heat Pump Changing filters regularly is an important part of maintaining a heat pump system. | Photo courtesy of ©iStockphoto/BanksPhotos Changing filters regularly is an important part of maintaining a heat pump system. | Photo courtesy of ©iStockphoto/BanksPhotos Proper operation of your heat pump will save energy. Do not set back the heat pump's thermostat if it causes the

  5. Conduct of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 1, 6-25-13

  6. Protection Program Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-10-14

    This Order establishes requirements for the management and operation of the Department of Energy (DOE) Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE.

  7. TYPE OF OPERATION

    Office of Legacy Management (LM)

    WASTE G RESIDUE a i-CtlED INVOLVE"ENT-AT SITE -'---... Control ci Health Physics Protection 0 AECtlED managed operations c Little or None G AECMED rea' poneible for ...

  8. TYPE OF OPERATION

    Office of Legacy Management (LM)

    181 WASTE & RESIDUE q ,r . ,, A&MED I NVOLVEMENI-AT SITE I - . : Control 1 Health Physics Protection ' I, 0 AEWHED managed operations 0 Little or None 13 AEWHED responsible for ...

  9. TYPE OF OPERATION

    Office of Legacy Management (LM)

    b RESIDUE q GOUT LECISED CONTReCTOR CONTRCICTOR -EEL ---LEeSED Control Health Physics 0 AEWMED managed operations q Little or No 0 AECMED responsible for AEWMED resp ...

  10. Reduction/Transformation Operators

    Energy Science and Technology Software Center (OSTI)

    2006-09-01

    RTOp (reduction/transformation operators) is a collection of C++ software that provides the basic mechanism for implementinig vector operations in a flexible and efficient manner. This is the main interface utilized by Thyra to allow for the specification of specific vector reduction and/or transformation operations. The RTOp package contains three different types of software. (a) a small number of interoperability interfaces. (b) support software including code for the parallel SPMD mode based on only Teuchos::Comm(and notmore » MPl directly(, and (c) a library of pre-implemented RTOp subclasses for everything from simple AXPYs and norms, to more specialized vector operations. RTOp allows an algorithm developer to implement their own RTOp subclasses in a way that is independent from any specific serial, parallel, out-of-core or other type of vector implementation. RTOp is a required package by Thyra and MOOCHO. (c)« less

  11. Conduct of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Admin Chg 2, dated 12-3-14, supersedes Admin Chg 1.

  12. Operations Security Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-04-30

    To establish policies, responsibilities and authorities for implementing and sustaining the Department of Energy (DOE) Operations Security (OPSEC) Program. Cancels DOE O 5632.3B. Canceled by DOE O 471.2 of 9-28-1995.

  13. Operating plan FY 1998

    SciTech Connect (OSTI)

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  14. Continuity of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-01-14

    The notice defines requirements and responsibilities for continuity of operations planning within the DOE to ensure the capability to continue essential Departmental functions across a wide range of all hazard emergencies. Does not cancel other directives.

  15. Rich land Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rich land Operations Office P.O. Box 550 July 10, 2009 CERTIFIED MAIL Mr. Ryan Jarvis Heart of America Northwest 1314 N.E. 56h" Street Suite 100 Seattle, Washington 98105 Dear Mr....

  16. CH Packaging Operations Manual

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2005-06-13

    This procedure provides instructions for assembling the CH Packaging Drum payload assembly, Standard Waste Box (SWB) assembly, Abnormal Operations and ICV and OCV Preshipment Leakage Rate Tests on the packaging seals, using a nondestructive Helium (He) Leak Test.

  17. Deputy Chief Operating Officer

    Broader source: Energy.gov [DOE]

    This position will be filled at either Morgantown, WV or Pittsburgh, PA. A successful candidate in this position will serve as the Deputy Chief Operating Officer assigned to the Laboratory...

  18. Operations | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Welcome to the Ames Laboratory and the operations pages of our website. Our website has recently been revised starting with the front page, the science division pages and a few pages needed for public interface. If you find that the pages you need are not available please contact the Manager in charge (i.e., Purchasing, Sponsored Programs, etc.) and we will get you the information you need.

  19. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    /: -. !~t. Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 Nav 0 4 ?nn~ 05-AMCP-OO46 Mr. Todd Martin, Chair Hanford Advisory Board 1933 Jadwin, Suite 135 Richland, Washington 99352 Dear Mr. Martin: HANFORD ADVISORY BOARD (HAB) ADVICE #166 -FUND U PLANT AREA REMEDIATION ACTIVITIES In response to your letter dated September 10, 2004, the U.S. Department of Energy, Richland Operations Office (RL), appreciates your recommendations contained in HAB Consensus

  20. About APPLE II Operation

    SciTech Connect (OSTI)

    Schmidt, T.; Zimoch, D.

    2007-01-19

    The operation of an APPLE II based undulator beamline with all its polarization states (linear horizontal and vertical, circular and elliptical, and continous variation of the linear vector) requires an effective description allowing an automated calculation of gap and shift parameter as function of energy and operation mode. The extension of the linear polarization range from 0 to 180 deg. requires 4 shiftable magnet arrrays, permitting use of the APU (adjustable phase undulator) concept. Studies for a pure fixed gap APPLE II for the SLS revealed surprising symmetries between circular and linear polarization modes allowing for simplified operation. A semi-analytical model covering all types of APPLE II and its implementation will be presented.

  1. Chapter 10: FTU Operation

    SciTech Connect (OSTI)

    Angelini, B.M.; Apicella, M.L.; Buceti, G.; Centioli, C.; Crisanti, F.; Iannone, F.; Mazza, G.; Mazzitelli, G.; Panella, M.; Vitale, V.

    2004-05-15

    Some specific points of the Frascati Tokamak Upgrade (FTU) operation are presented for plasma performance as well as for the machine availability and the development of new tools needed to operate in a complex scenario needed for tokamak research. The different techniques adopted for wall conditioning of the FTU are reviewed. Plasmas with low Z{sub eff} have been achieved including those at low density and high additional heating power. The obtained experimental results are discussed in terms of better operation and plasma performance achieved. As with any other large - and thus long-lasting - experiments, a mixture of old and new technological solutions inserted in an open source framework characterizes the FTU data control and acquisition systems. We give some information on the original architecture and try to detail its current state. The high level of reliability presently achieved is discussed.

  2. Conduct of Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 1, dated 6-25-13, cancels DOE O 422.1. Certified 12-3-14.

  3. Electromagnetically Operated Counter

    DOE Patents [OSTI]

    Goldberg, H.D.; Goldberg, M.I.

    1951-12-18

    An electromagnetically operated counter wherein signals to be counted are applied to cause stepwise rotation of a rotatable element which is connected to a suitable register. The mechanism involved consists of a rotatable armature having three spaced cores of magnetic material and a pair of diametrically opposed electromagnets with a suitable pulsing circuit to actuate the magnets.

  4. LCLS Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LCLS Operating Schedule August - December 2009 Ver: 2 103009 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S...

  5. Concept of Operations: Essence

    SciTech Connect (OSTI)

    Hutton, William J.

    2014-04-01

    This concept of operations is designed to give the reader a brief overview of the National Rural Electric Cooperative Association’s Essence project and a description of the Essence device design. The data collected by the device, how the data are used, and how the data are protected are also discussed in this document.

  6. Protection Program Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-03-23

    The Order establishes requirements for the management and operation of the DOE Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE. Supersedes DOE O 473.3. NOTE: Safeguards and Security Alarm Management and Control Systems, of DOE O 473.3, is retained as Attachment 3, Annex 1.

  7. Office of Business Operations

    Broader source: Energy.gov [DOE]

    The Office of Business Operations manages financial and acquisition management programs throughout the Associate Under Secretary for the Office of Environment, Health, Safety and Security (AU), including the formulation and execution of the AU budget; funding control and accounting activities; preparation of management studies; and provision of acquisition management support.

  8. Intelligent Potroom Operation

    SciTech Connect (OSTI)

    Jan Berkow; Larry Banta

    2003-07-29

    The Intelligent Potroom Operation project focuses on maximizing the performance of an aluminum smelter by innovating components for an intelligent manufacturing system. The Intelligent Potroom Advisor (IPA) monitors process data to identify reduction cells exhibiting behaviors that require immediate attention. It then advises operational personnel on those heuristic-based actions to bring the cell back to an optimal operating state in order to reduce the duration and frequency of substandard reduction cell performance referred to as ''Off-Peak Modes'' (OPMs). Techniques developed to identify cells exhibiting OPMs include the use of a finite element model-based cell state estimator for defining the cell's current operating state via advanced cell noise analyses. In addition, rule induction was also employed to identify statistically significant complex behaviors that occur prior to OPMs. The intelligent manufacturing system design, concepts and formalisms developed in this project w ere used as a basis for an intelligent manufacturing system design. Future research will incorporate an adaptive component to automate continuous process improvement, a technology platform with the potential to improve process performance in many of the other Industries of the Future applications as well.

  9. Guiding drilling operations

    SciTech Connect (OSTI)

    Not Available

    1985-06-01

    Artificial intelligence (AI) was the overriding theme at this year's Offshore Technology Conference (OTC) exhibition and conference, with the emphasis more on drilling rather than production methods. A wide range of electronic aids to improve accuracy and speed in drilling operations - from calculators to computers - is described.

  10. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    School Bus Idle Reduction Requirement The Mississippi State Department of Education requires public school district bus operators to minimize school bus idling to reduce exposure to diesel exhaust. (Reference Mississippi Code 37-11-71

  11. Operational Pause at Savannah River Site Benefits Safety Culture, Operations

    Broader source: Energy.gov [DOE]

    AIKEN, S.C. – EM and the Savannah River Site (SRS) management and operations contractor are seeing positive impacts on safety culture as the site works to restore operations following last year’s operational pause.

  12. BASE Operator's Manual - 88-Inch Cyclotron

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BASE Operator's Manual BASE_Facility_-_SEE_Software_Operation.doc

  13. THERMALLY OPERATED VAPOR VALVE

    DOE Patents [OSTI]

    Dorward, J.G. Jr.

    1959-02-10

    A valve is presented for use in a calutron to supply and control the vapor to be ionized. The invention provides a means readily operable from the exterior of the vacuum tank of the apparatuss without mechanical transmission of forces for the quick and accurate control of the ionizing arc by a corresponding control of gas flow theretos thereby producing an effective way of carefully regulating the operation of the calutron. The invention consists essentially of a tube member extending into the charge bottle of a calutron devices having a poppet type valve closing the lower end of the tube. An electrical heating means is provided in the valve stem to thermally vary the length of the stem to regulate the valve opening to control the flow of material from the charge bottle.

  14. Operations building | Y-12 National Security Complex

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations building Operations building Chemical recycling columns in an operations building

  15. SWiFT Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power Supercritical CO2 Geothermal Natural Gas Safety, Security & Resilience of the Energy Infrastructure Energy Storage Nuclear Power & Engineering Grid Modernization Battery Testing Nuclear Fuel Cycle Defense Waste Management Programs Advanced Nuclear

  16. Transmission and Storage Operations

    Energy Savers [EERE]

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014 Agenda * DTE Gas Snapshot * NOx & CO - Combustion stability * Methane - Packing - Blowdowns * Capture vs Flare 2 SNAPSHOT * DTE Gas - 41 Units * Age Range: 8-59yrs (Average 45yrs) - 118,200HP * 1,000-15,000HP - 7 different manufacturers * Cooper-Bessemer, Solar, Waukesha, DeLaval, IR, CAT, Ariel - Complete Mixture *

  17. Fermilab | Tevatron | Tevatron Operation

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tevatron Operation Fermilab's Accelerator Complex Fermilab's Accelerator Complex has 10 accelerators. The Tevatron, which shuts down on Sept. 30, is one of those accelerators. The Cockcroft Walton accelerates negative hydrogen ions to 740 kilo electron volts (KeV). The negative ions are then accelerated down the LINAC to 400 MeV. The particles enter the booster where the electrons are stripped off, leaving the protons. In the Booster, the protons are then accelerated to 8 GeV. Once the protons

  18. Operational health physics training

    SciTech Connect (OSTI)

    1992-06-01

    The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of {alpha}, {beta}, {gamma}, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included.

  19. Richland Operations Office - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Richland Operations Office Richland Operations Office Richland Operations Office River Corridor Central Plateau Groundwater Mission Support Newsroom Richland Operations Office Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size Registration for 2016 Hanford Cleanup Tours Hanford Public Comment Period Hanford Public Comment Period UNITED STATES DEPARTMENT OF ENERGY Richland Operations Office RL2016LogoVert StacyCharboneau Welcome to the Richland Operations Office (RL),

  20. Movements and Distribution of Northern Squawfish Downstream of Lower Snake River Dams Relative to the Migration of Juvenile Salmonids, 1992-1993 Completion Report.

    SciTech Connect (OSTI)

    Isaak, D.J.; Bjornn, T.C.

    1996-03-01

    Northern squawfish Ptychocheilus oregonensis movements were monitored downstream of two lower Snake River dams during the juvenile salmonid migrations of 1992 and 1993. During a high flow year in 1993, the abundance of squawfish in the tailrace of Lower Granite Dam peaked in July, after the majority of juveniles had moved past Lower Granite Dam, and peak abundance was inversely related to river discharge. Few squawfish moved into the tailrace of Ice Harbor Dam in 1993 because of the extended period of spill. Distributions of squawfish in the tailrace of Lower Granite Dam varied between and within years and shifted in response to changing prey densities, flow patterns, water temperature, and diel cycles, but fish consistently used low velocity habitats. Data from Ice Harbor Dam is less extensive, but squawfish distributions there appeared to be affected by changing flow patterns and fish used low velocity habitats. The changes in distribution and abundance of squawfish in tailrace areas are evidence that predation on seaward migrating salmonids depends on the timing of migration and size and timing of runoff. Juvenile salmonids migrating in the spring and early summer will probably be less affected by squawfish predation in tailrace areas than salmon that migrate later in the summer.

  1. Equipment Operational Requirements

    SciTech Connect (OSTI)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  2. Idaho Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 2. 2010 Josh Berman 2 N. Riverside Plaza, Suite 2250 Chicago, IL 60606 SUBJECT: FOIA Response (10-034) (lD-201O-01859-F)(OHA Case No. TFA-0404) (OM-PA-I0- 062) Dear Mr. Berman: This is a revised final response from the Idaho Operations Office (DOE-ID), regarding your July 22, 2010, Freedom ofInformation Act (FOIA) request. In that letter you requested: * Richard Boardman Emails * WoodiGrubick Emails FY 2006 * Wood/Grubick Emails FY 2007 * WoodiGrubick Emails FY 2008 * WoodiGrubick

  3. Idaho Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    31,2010 Rod Wetsch 420 County Road 26 Beulah, ND 58523 SUBJECT: FOIA Response (10-035) (ID-2010-01986-F) (OM-PA-I0-061) Dear Mr. Wetsch: This is in final response from the Idaho Operations Office (DOE-ID), regarding your June 2, 2010, Freedom of Information Act Request. In that e-mail you requested documents relating to: "vulnerabilities of running desktop applications (Word, Excel, and PowerPoint) on the same platform as the process control systems applications." The administrator for

  4. Operations | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Achieving Diversity and Inclusion: An Evidence-based Approach Shuttle service will be provided beginning at 9:15 a.m. with stops at Buildings 201, 212, 202, 240, 222, 203, 208, 200, 205 and 362. Return trips will follow the talk. Read more about Achieving Diversity and Inclusion: An Evidence-based Approach Jerome LinMay 10, 2016 Postdoctoral Appointee Read more about Jerome Lin Anne BoronMay 6, 2016 Safety Systems Engineering Specialist Read more about Anne Boron First Friday Forum:

  5. Nevada Operations Office

    Office of Legacy Management (LM)

    Nevada Operations Office t' . 0. Box 14100, Las Vegas, NV 89114-4100 Lt. Col. Kent J. Rohlof; USAF Commander 554th Civil Engineering Support Squadron (TAC) Nellis Air Force Base, NV 89191 DISPOSAL OF LIQUID RADIOACTIVE WASTE--NELLIS AIR FORCE BASE Layton O'Neill and Thomas Graham of my office recently visited two sites at Nellis AFB, Area II, identified as locations for burial of radioactive waste. The purpose of this visit was to visually inspect the physical status of the sites, one identified

  6. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    :4Tsc1 ~Richland, Washington 99352 December 18, 2009 CERTIFIED MAIL Ms. Shannon Dininny The Associated Press P.O. Box 1349 Yakima, Washington 98901 Dear Ms. Dininny: FREEDOM OF INFORMATION ACT REQUEST (FOI 20 10-00644) Your Freedom of Information Act (FOIA) request dated December 2, 2009, addressed to the U.S. Department of Energy, Headquarters FOJA Office has been forwarded to this office for response as well as to the DOE Office of Environmental Management (EM), the Oak Ridge Operations Office

  7. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 TL~ Rich land, Washington 99352 APR 0 22012 1 2-EMD-0057 Addressees - See Attached SUPPLEMENT TO DOE/RL-201 1-27, HANFORD SITE AIR OPERATING PERMIT (AOP) RENEWAL APPLICATION: COVERING THE PERIOD JANUARY 1, 2011, THROUGH DECEMBER 31, 2011 (DOE/RL-201 2-04, REV. 0) Enclosed is DOE/RL-20 12-04, Supplement to DOE/RL-20 11-27, "Hanford Site AOP Renewal Application: Covering the period January 1, 2011, through December 31, 2011." The AOP Renewal Application Supplement is being submitted in

  8. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ITEM 1 Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 15-PRO-0175 APR 3 0 205 Mr. J. A. Ciucci, President and Chief Executive Officer CH2M HILL Plateau Remediation Company Richland, Washington 99352 Dear Mr. Ciucci: CONTRACT NO. DE-ACO6-08RL 14788 - FISCAL YEAR (FY) 2014 FINAL FEE DETERMINATION FOR PLATEAU REMEDIATION CONTRACT The purpose of this letter is to provide the final fee determination for the FY 2014 evaluation period. Pursuant to the

  9. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ATESORichland, Washington 99352 16-PRO-0061 DEC 17 2015 Ms. H. P. Mooers, President HPM Corporation 4304 West 2 4 th Aye, Suite 100 Kennewick, Washington 99338 Dear Ms. Mooers: CONTRACT NO. DE-EM0002043 - HPM CORPORATION (HPMC) FISCAL YEAR 2015 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) FEE DETERMINATION The U.S. Department of Energy Richland Operation Office (RL) has completed its evaluation of I-PMC's performance for the period of October 1, 2014, through September 30, 2015. As the Fee

  10. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Richland Operations Office P.O. Box 550 &?ATES0~Richland, Washington 99352 10O-AMSE-0054 A PR I~ ~~ Mr. J. G. Lehew III, President and Chief Executive Officer CH2M HILL Plateau Remediation Company Richland, Washington 99352 Dear Mr. Lehew: CONTRACT NO. DE-AC06-08RL14788 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HASQARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Attachment J.2, List B:

  11. Oak Ridge Operations YTO

    Office of Legacy Management (LM)

    ed States Government Department of Energy Oak Ridge Operations YTO r , , EM-93:Hartman I -= CATEGORICAL EXCLUSION (CX) DETERMINATION - RMOVAL ACTION AT M E SPRINGDALE r SITE I -a Carol U. Borgstrom, Director, Office o f NEPA Oversight, EH-25 . r Attached i s a categorical exclusion (CX) determination describing t h e proposed removal and disposal o f r a d i o l o g i c a l l y contaminated materials a t t h e r Springdale, Pennsylvania, s i t e . I have determined t h a t t h i s a c t i o n

  12. Oak Ridge Operations.

    Office of Legacy Management (LM)

    4s - 22 Department of Energy Oak Ridge Operations. S~I9J>liB~~ ~P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director Pennsylvania Department of Environmental Resources 400 Waterfront Drive Pittsburgh, Pennsylvania 15222-4745 Dear Mr. Duritsa: FUSRAP PENNSYLVANIA SITES - LETTER OF APPRECIATION I would like to express my appreciation for the assistance Jim Yusko, Hark Russell, Dennis Angelo, Steve Hepler, and Roy Woods provided to the

  13. Business Operations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations Business Operations The Office of Business Operations is the central organization for all Office of Energy Efficiency and Renewable Energy (EERE) organizational products and services, processes, and systems. The four main offices and managers of Business Operations - the Project Management Coordination Office, the Information Technology and Services Office, Workforce Management Office and the Golden Field Office - are outlined in the Business Operations organization chart. Offices

  14. Plant Operational Status - Pantex Plant

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plant Operational Status Plant Operational Status Page Content Shift 1 - Day The Pantex Plant is open for normal Day Shift operations. Plant personnel are to report as assigned. Personnel may call 477-3000, Option 1 for additional details. Shift 2 - Swing The Pantex Plant is open for normal Swing Shift operations. Plant personnel are to report as assigned. Personnel may call 477-3000, Option 1 for additional details. Shift 3 - Grave The Pantex Plant is open for normal Graveyard Shift operations.

  15. Step 5: Operations and Maintenance

    Energy Savers [EERE]

    Process Step 5: Project Operations and Maintenance Project Development Process 1 Potential 5 Operations & Maintenance 3 Refinement 2 Options 4 Implementation 2 1/28/2016 2 Presentation Agenda * Step 5: Project Operations and Maintenance (O&M) * Post-procurement activities * Drivers * Technology examples * Activity 3 Potential Options Refinement Implementation Operations & Maintenance Step 5: Operations & Maintenance 4 Photo by Warren Getz, NREL 00180 Purpose: Conduct or ensure

  16. RHIC Polarized proton operation

    SciTech Connect (OSTI)

    Huang, H.; Ahrens, L.; Alekseev, I.G.; Aschenauer, E.; Atoian, G.; Bai, M.; Bazilevsky, A.; Blaskiewicz, M.; Brennan, J.M.; Brown, K.A.; Bruno, D.; Connolly, R.; Dion, A.; D'Ottavio, T.; Drees, K.A.; Fischer, W.; Gardner, C.; Glenn, J.W.; Gu, X.; Harvey, M.; Hayes, T.; Hoff, L.; Hulsart, R.L.; Laster, J.; Liu, C.; Luo, Y.; MacKay, W.W.; Makdisi, Y.; Marr, G.J.; Marusic, A.; Meot, F.; Mernick, K.; Michnoff, R,; Minty, M.; Montag, C.; Morris, J.; Nemesure, S.; Poblaguev, A.; Ptitsyn, V.; Ranjibar, V.; Robert-Demolaize, G.; Roser, T.; J.; Severino, F.; Schmidke, B.; Schoefer, V.; Severino, F.; Smirnov, D.; Smith, K.; Steski, D.; Svirida, D.; Tepikian, S.; Trbojevic, D.; Tsoupas, N.; Tuozzolo, J. Wang, G.; Wilinski, M.; Yip, K.; Zaltsman, A.; Zelenski, A.; Zeno, K.; Zhang, S.Y.

    2011-03-28

    The Relativistic Heavy Ion Collider (RHIC) operation as the polarized proton collider presents unique challenges since both luminosity(L) and spin polarization(P) are important. With longitudinally polarized beams at the experiments, the figure of merit is LP{sup 4}. A lot of upgrades and modifications have been made since last polarized proton operation. A 9 MHz rf system is installed to improve longitudinal match at injection and to increase luminosity. The beam dump was upgraded to increase bunch intensity. A vertical survey of RHIC was performed before the run to get better magnet alignment. The orbit control is also improved this year. Additional efforts are put in to improve source polarization and AGS polarization transfer efficiency. To preserve polarization on the ramp, a new working point is chosen such that the vertical tune is near a third order resonance. The overview of the changes and the operation results are presented in this paper. Siberian snakes are essential tools to preserve polarization when accelerating polarized beams to higher energy. At the same time, the higher order resonances still can cause polarization loss. As seen in RHIC, the betatron tune has to be carefully set and maintained on the ramp and during the store to avoid polarization loss. In addition, the orbit control is also critical to preserve polarization. The higher polarization during this run comes from several improvements over last run. First we have a much better orbit on the ramp. The orbit feedback brings down the vertical rms orbit error to 0.1mm, much better than the 0.5mm last run. With correct BPM offset and vertical realignment, this rms orbit error is indeed small. Second, the jump quads in the AGS improved input polarization for RHIC. Third, the vertical tune was pushed further away from 7/10 snake resonance. The tune feedback maintained the tune at the desired value through the ramp. To calibrate the analyzing power of RHIC polarimeters at any energy above injection, the polarized hydrogen jet target runs for every fill with both beams. Based on the known analyzing power, there is very little polarization loss between injection and 100 GeV. An alternative way is to measure the asymmetry at 100 GeV followed by ramping up to 250 GeV and back down to 100 GeV and then to measure the asymmetry again at 100 GeV. If the asymmetry after the down ramp is similar to the measurement before the up ramp, polarization was also preserved during the ramp to 250 GeV. The analyzing power at storage energy can then be extracted from the asymmetries measured at 100 GeV and 250 GeV. The tune and orbit feedbacks are essential for the down ramp to be possible. The polarized proton operation is still going on. We will push bunch intensity higher until reaching the beam-beam limit. The even higher intensity will have to wait for the electron lenses to compensate the beam-beam effect. To understand the details of spin dynamics in RHIC with two snakes, spin simulation with the real magnet fields have been developed recently. The study will provide guidance for possible polarization loss schemes. Further polarization gain will requires a polarized source upgrade; more careful setup jump quads in the AGS to get full benefit; and control emittance in the whole accelerator chain.

  17. REMOTELY OPERATED MANIPULATOR

    DOE Patents [OSTI]

    Hutto, E.L.

    1961-08-15

    A manipulator is described for performing, within an entirely enclosed cell containling radioactive materials, various mechanical operations. A rod with flexible fingers is encompassed by a tubular sleeve shorter than the rod. Relative movement between the rod and sleeve causes the fingers to open and close. This relative movement is effected by relative movement of permanent magnets in magnetic coupling relation to magnetic followers affixed to the ends of the rod and sleeve. The rod and its sleeve may be moved as a unit axially or may be rotated by means of the magnetic couplings. The manipulator is enclosed within a tubular member which is flexibly sealed to an opening in the cell. (AEC)

  18. FRMAC Operations Manual

    SciTech Connect (OSTI)

    Frandsen, K.

    2010-05-01

    In the event of a major radiological incident, the Federal Radiological Monitoring and Assessment Center (FRMAC) will coordinate the federal agencies that have various statutory responsibilities. The FRMAC is responsible for coordinating all environmental radiological monitoring, sampling, and assessment activities for the response. This manual describes the FRMAC’s response activities in a radiological incident. It also outlines how FRMAC fits in the National Incident Management System (NIMS) under the National Response Framework (NRF) and describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the affected areas. In the event of a potential or existing major radiological incident, the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is responsible for establishing and managing the FRMAC during the initial phases.

  19. Burkholderia phytofirmans inoculation-induced changes on the shoot cell anatomy and iron accumulation reveal novel components of Arabidopsis-endophyte interaction that can benefit downstream biomass deconstruction

    DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

    Zhao, Shuai; Wei, Hui; Lin, Chien -Yuan; Zeng, Yining; Tucker, Melvin P.; Himmel, Michael E.; Ding, Shi -You

    2016-01-29

    In this study, it is known that plant growth promoting bacteria (PGPB) elicit positive effects on plant growth and biomass yield. However, the actual mechanism behind the plant-PGPB interaction is poorly understood, and the literature is scarce regarding the thermochemical pretreatability and enzymatic degradability of biomass derived from PGPB-inoculated plants. Most recent transcriptional analyses of PGPB strain Burkholderia phytofirmans PsJN inoculating potato in literature and Arabidopsis in our present study have revealed the expression of genes for ferritin and the biosynthesis and transport of siderophores (i.e., the molecules with high affinity for iron), respectively. The expression of such genes inmore » the shoots of PsJN-inoculated plants prompted us to propose that PsJN-inoculation can improve the host plant's iron uptake and accumulation, which facilitates the downstream plant biomass pretreatment and conversion to simple sugars. In this study, we employed B. phytofirmans PsJN to inoculate the Arabidopsis thaliana plants, and conducted the first investigation for its effects on the biomass yield, the anatomical organization of stems, the iron accumulation, and the pretreatment and enzymatic hydrolysis of harvested biomass. The results showed that the strain PsJN stimulated plant growth in the earlier period of plant development and enlarged the cell size of stem piths, and it also indeed enhanced the essential metals uptake and accumulation in host plants. Moreover, we found that the PsJN-inoculated plant biomass released more glucose and xylose after hot water pretreatment and subsequent co-saccharification, which provided a novel insight into development of lignocellulosic biofuels from renewable biomass resources.« less

  20. Web Operational Status Boards

    SciTech Connect (OSTI)

    2004-04-16

    Web Operational Status Boards (WebOSB)is a web-based application designed to acquire, display, and update highly dynamic status information between multiple users and jurisdictions. WebOSB is able to disseminate real-time status information?support the timely sharing of information?with constant, dynamic updates via personal computers and the Internet between emergency operations centers (EOCs), incident command centers, and to users outside the EOC who need to know the information (hospitals, shelters, schools). The WebOSB application far exceeds outdated information-sharing methods used by emergency workers: whiteboards, Word and Excel documents, or even locality-specific Web sites. WebOSB?s capabilities include the following elements: - Secure access. Multiple users can access information on WebOSB from any personal computer with Internet access and a secure ID. Privileges are use to control access and distribution of status information and to identify users who are authorized to add or edit information. - Simultaneous update. WebOSB provides options for users to add, display, and update dynamic information simultaneously at all locations involved in the emergency management effort, A single status board can be updated from multiple locations enabling shelters and hospitals to post bed availability or list decontamination capability. - On-the-fly modification. Allowing the definition of an existing status board to be modified on-the-fly can be an asset during an emergency, where information requirements can change quickly. The status board designer feature allows an administrator to quickly define, modi,, add to, and implement new status boards in minutes without needing the help of Web designers and computer programmers. - Publisher/subscriber notification. As a subscriber, each user automatically receives notification of any new information relating to specific status boards. The publisher/subscriber feature automatically notified each user of any new information relating to specific status boards. WebOSB can be installed to fit the specific needs of an emergency management community. Because it was originally developed to concurrently support multiple EOCs at the local, county, and state level, it can also support multi-user environments for other types of projects.

  1. Web Operational Status Boards

    Energy Science and Technology Software Center (OSTI)

    2004-04-16

    Web Operational Status Boards (WebOSB)is a web-based application designed to acquire, display, and update highly dynamic status information between multiple users and jurisdictions. WebOSB is able to disseminate real-time status information—support the timely sharing of information—with constant, dynamic updates via personal computers and the Internet between emergency operations centers (EOCs), incident command centers, and to users outside the EOC who need to know the information (hospitals, shelters, schools). The WebOSB application far exceeds outdated information-sharingmore » methods used by emergency workers: whiteboards, Word and Excel documents, or even locality-specific Web sites. WebOSB’s capabilities include the following elements: - Secure access. Multiple users can access information on WebOSB from any personal computer with Internet access and a secure ID. Privileges are use to control access and distribution of status information and to identify users who are authorized to add or edit information. - Simultaneous update. WebOSB provides options for users to add, display, and update dynamic information simultaneously at all locations involved in the emergency management effort, A single status board can be updated from multiple locations enabling shelters and hospitals to post bed availability or list decontamination capability. - On-the-fly modification. Allowing the definition of an existing status board to be modified on-the-fly can be an asset during an emergency, where information requirements can change quickly. The status board designer feature allows an administrator to quickly define, modi,, add to, and implement new status boards in minutes without needing the help of Web designers and computer programmers. - Publisher/subscriber notification. As a subscriber, each user automatically receives notification of any new information relating to specific status boards. The publisher/subscriber feature automatically notified each user of any new information relating to specific status boards. WebOSB can be installed to fit the specific needs of an emergency management community. Because it was originally developed to concurrently support multiple EOCs at the local, county, and state level, it can also support multi-user environments for other types of projects.« less

  2. LCLS Operating Schedule

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LCLS Operating Schedule August - December 2009 Ver: 2 10/30/09 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M 0000-0800 MD MD MD MD MD 0800-1600 ROD MD AMO ROD MD AMO 1600-2400 MD MD Commissioning MD MD Comm. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W 0000-0800 MD MD MD MD MD MD MD MD

  3. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Idle Reduction Weight Exemption A commercial vehicle equipped with qualified idle reduction technology may exceed the state's gross, total axle, or bridge formula vehicle weight limits by up to 400 pounds to compensate for the additional weight of the idle reduction technology. Upon request, vehicle operators must provide proof that the idle reduction technology is fully functional. (Reference Alaska Administrative Code 17.25.01

  4. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Idle Reduction Weight Exemption Any motor vehicle equipped with idle reduction technology may exceed the gross vehicle or internal bridge weight by the amount equal to the certified weight of the idle reduction technology, up to 550 pounds. To be eligible, the operator must present written verification of the weight of the idle reduction technology and demonstrate that it is fully functional at all times. (Reference Florida Statutes 316.54

  5. The Bender-Dunne basis operators as Hilbert space operators

    SciTech Connect (OSTI)

    Bunao, Joseph; Galapon, Eric A. E-mail: eric.galapon@upd.edu.ph

    2014-02-15

    The Bender-Dunne basis operators, T{sub ?m,n}=2{sup ?n}?{sub k=0}{sup n}(n/k )q{sup k}p{sup ?m}q{sup n?k} where q and p are the position and momentum operators, respectively, are formal integral operators in position representation in the entire real line R for positive integers n and m. We show, by explicit construction of a dense domain, that the operators T{sub ?m,n}'s are densely defined operators in the Hilbert space L{sup 2}(R)

  6. DOE Corporate Operating Experience Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-08

    The Order institutes a DOE wide program for the management of operating experience to prevent adverse operating incidents and facilitate the sharing of good work practices among DOE sites. Supersedes DOE O 210.2.

  7. Facility Operations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Facility Operations Facility Operations The Office of Management provides many of the services that keep the Department of Energy facilities operating, as well as many of the managerial support functions that are shared by many of the Program Offices. These functions are primarily provided by the Office of Administration, MA-40. Facility Operations Electrical Maintenance Furniture and Carpeting Furniture Repairs - If you are located at Germantown, Corporate 270, or Cloverleaf, the number for

  8. Jefferson Lab Chief Operating Officer

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    COO Privacy and Security Notice Skip over navigation Search the JLab Site Chief Operating Officer Please upgrade your browser. This site's design is only visible in a graphical browser that supports web standards, but its content is accessible to any browser. Concerns? Group Navigation COO Home Lab Contracts print version Mike Dallas Chief Operating Officer mdallas@jlab.org, x7538 Chief Operating Officer (COO) The Chief Operating Officer is responsible for the business functions of Jefferson

  9. ARM - ARM Operations Quarterly Reports

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Quarterly Reports Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library...

  10. Operations | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Operations NNSA's Emergency Response Operations program acts as the headquarters command and control, functioning as the coordinating focal point for all deployed assets during a nuclear or radiological incident. It also acts as support to any national special security events, special events, the Department of Defense; the Department of State during operations outside the continental United States and local, state, or federal law enforcement. The Operations Program coordinates the following

  11. PNNL Electricity Infrastructure Operations Center | Open Energy...

    Open Energy Info (EERE)

    Electricity Infrastructure Operations Center Jump to: navigation, search Logo: Electricity Infrastructure Operations Center Name Electricity Infrastructure Operations Center...

  12. Operating Reserves and Variable Generation

    SciTech Connect (OSTI)

    Ela, E.; Milligan, M.; Kirby, B.

    2011-08-01

    This report tries to first generalize the requirements of the power system as it relates to the needs of operating reserves. It also includes a survey of operating reserves and how they are managed internationally in system operations today and then how new studies and research are proposing they may be managed in the future with higher penetrations of variable generation.

  13. Atmospheric Radiation Measurement Climate Research Facility (ARM) | U.S.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (Barrels per Calendar Day) Data Series: Total Number of Operable Refineries Number of Operating Refineries Number of Idle Refineries Atmospheric Crude Oil Distillation Operable Capacity (B/CD) Atmospheric Crude Oil Distillation Operating Capacity (B/CD) Atmospheric Crude Oil Distillation Idle Capacity (B/CD) Atmospheric Crude Oil Distillation Operable Capacity (B/SD) Atmospheric Crude Oil Distillation Operating Capacity (B/SD) Atmospheric Crude Oil Distillation Idle Capacity (B/SD) Vacuum

  14. Reservoir release patterns for hydropower operations at the Aspinall Unit on the Gunnison River, Colorado

    SciTech Connect (OSTI)

    Yin, S.C.L.; McCoy, J.J.; Sedlacek, J.

    1995-05-01

    This report presents the development of reservoir release patterns for the Aspinall Unit, which includes Blue Mesa, Morrow Point, and Crystal Reservoirs on the Gunnison River in Colorado. Release patterns were assessed for two hydropower operational scenarios--seasonally adjusted steady flows and seasonally adjusted high fluctuating flows--and three representative hydrologic years--moderate (1987), dry (1989), and wet (1983). The release patterns for the operational scenarios were developed with the aid of monthly, daily, and hourly reservoir operational models, which simulate the linked operation of the three Aspinall Unit reservoirs. Also presented are reservoir fluctuations and downstream water surface elevations corresponding to the reservoir release patterns. Both of the hydropower operational scenarios evaluated are based on the ecological research flows proposed by the US Fish and Wildlife Service for the Aspinall Unit. The first operational scenario allows only seasonally adjusted steady flows (no hourly fluctuations at any dam within one day), whereas the second scenario permits high fluctuating flows from Blue Mesa and Morrow Point Reservoirs during certain times of the year. Crystal Reservoir would release a steady flow within each day under both operational scenarios.

  15. Turbulence Investigation and Reproduction for Assisting Downstream Migrating Juvenile Salmonids, Part II of II; Effects of Induced Turbulence on Behavior of Juvenile Salmon, 2001-2005 Final Report.

    SciTech Connect (OSTI)

    Perry, Russell W.; Farley, M. Jared; Hansen, Gabriel S.

    2005-07-01

    Passage through dams is a major source of mortality of anadromous juvenile salmonids because some populations must negotiate up to eight dams in Columbia and Snake rivers. Dams cause direct mortality when fish pass through turbines, but dams may also cause indirect mortality by altering migration conditions in rivers. Forebays immediately upstream of dams have decreased the water velocity of rivers and may contribute substantially to the total migration delay of juvenile salmonids. Recently, Coutant (2001a) suggested that in addition to low water velocities, lack of natural turbulence may contribute to migration delay by causing fish to lose directional cues. Coutant (2001a) further hypothesized that restoring turbulence in dam forebays may reduce migration delay by providing directional cues that allow fish to find passage routes more quickly (Coutant 2001a). Although field experiments have yielded proof of the concept of using induced turbulence to guide fish to safe passage routes, little is known about mechanisms actually causing behavioral changes. To test hypotheses about how turbulence influences movement and behavior of migrating juvenile salmonids, we conducted two types of controlled experiments at Cowlitz Falls Dam, Washington. A common measure of migration delay is the elapsed time between arrival at, and passage through, a dam. Therefore, for the first set of experiments, we tested the effect of induced turbulence on the elapsed time needed for fish to traverse through a raceway and pass over a weir at its downstream end (time trial experiment). If turbulence helps guide fish to passage routes, then fish should pass through the raceway quicker in the presence of appropriately scaled and directed turbulent cues. Second, little is known about how the physical properties of water movement provide directional cues to migrating juvenile salmonids. To examine the feasibility of guiding fish with turbulence, we tested whether directed turbulence could guide fish into one of two channels in the raceway, and subsequently cause them to pass disproportionately over the weir where turbulent cues were aimed (guidance experiment). Last, we measured and mapped water velocity and turbulence during the experiments to understand water movement patterns and the spatial distribution of turbulence in the raceways.

  16. Fact #861 February 23, 2015 Idle Fuel Consumption for Selected...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    from a study by the American Trucking Associations; both of the medium heavy truck results were from a study published in the Journal of the Air & Waste Management Association. ...

  17. National Idling Reduction Network News - Early Spring 2009

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Schools, the Heinz Endowments, Clean Water Action, Group Against Smog and Pollution, and the Clean Air Task Force Pittsburgh Healthy School Bus Fund 500,000 Rolling deadline until ...

  18. Alternative Fuels Data Center: County Fleet Goes Big on Idle...

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    With a population of about 200,000, Canyon County, Idaho, may not be very big. But its recent successes in reducing petroleum use are enormous. About two years ago, Canyon County ...

  19. Schools Move Forward with Idle Reduction | Department of Energy

    Energy Savers [EERE]

    Agreement.pdf Scanned_Agreement.pdf PDF icon Scanned_Agreement.pdf More Documents & Publications MOED_of_the_Italian_Republic.PDF International_Agreements_January_2001_December_2004.pdf Implementing Arrangement Between DOE and METI on R&D Cooperation on Clean Energy Technology - April 2015

    English).pdf Scanned_Joint_Declaration_(English).pdf PDF icon Scanned_Joint_Declaration_(English).pdf More Documents & Publications Joint Statement by Energy Ministers of G8, The People's

  20. September 2014 National Idling Reduction Network News | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Heavy-Duty Battery Electric Vehicles: Technology Assessment (CARB: Technology Assessment presentation) Medium-Duty Fleets Look for Alternative Drivetrain "Holy Grail" (Work Truck ...

  1. Case Study - Idle Reduction Technologies for Emergency Service Vehicles |

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CNG ........................................................................................................................................ 4 Financial Benefits ........................................................................................................................................................... 4 Environment and Energy Benefits .............................................................................................................................. 4 Other Benefits

  2. August 2015 National Idling Reduction Network News | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Other Resources of Interest Advanced Energy Storage for Automotive Applications: Lithium Ion Batteries for Battery, Plug-In Hybrid, and Hybrid Electric Vehicles and...

  3. Rocky Flats Environmental Technology Site Idle Equipment, August 21, 1997

    Office of Environmental Management (EM)

  4. Comparing Emissions Benefits from Regulating Heavy Vehicle Idling...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Announces the Energy Materials Network EERE Announces the Energy Materials Network In support of President Obama's Materials Genome Initiative, the Energy Department launched ...

  5. Comparing Emissions Benefits from Regulating Heavy Vehicle Idling |

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy gaines.pdf More Documents & Publications Future Diesel Engine Thermal Efficiency Improvement andn Emissions Control Technology 3-D Printed Molds Hold Promise for Enhanced Wind Energy Manufacturing 3-D Printed Molds Hold Promise for Enhanced Wind Energy Manufacturing The Energy Department is exploring the production of wind energy blade molds through 3-D printing, which could reduce production time from about a year to six weeks. EERE Announces the Energy Materials

  6. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Welch, J.L.; Stephens, R.K. )

    1992-09-01

    This paper reports on coiled tubing units which are used for many types of remedial well operations, including sand plugbacks, cement squeezes, fill cleanouts, underreaming, acid stimulations, and fishing. Fishing operations include removal of inflatable bridge plugs, lock mandrels stuck in profile nipples, coiled tubing, coiled tubing bottomhole assemblies (BHAs) and wireline. Recommended guidelines for selecting candidates, proper tool string configuration and operational techniques are presented here to assist coiled tubing supervisors and company representatives in the planning and implementation of efficient and effective fishing operations. Treatment of these areas are not intended to be exhaustive, but rather generally representative of common applications. Each fishing operation requires individualized analysis and planning.

  7. Operations & Maintenance Best Practices Guide: Chapter 3

    Broader source: Energy.gov [DOE]

    Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  8. Refund Policy | Argonne Leadership Computing Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Number and Capacity of Operable Petroleum Refineries by PAD District and State as of January 1, 2011 Idle Operating Total Stream Day Barrels per Idle Operating Total Calendar Day Barrels per Atmospheric Crude Oil Distillation Capacity Idle Operating Total Operable Refineries Number of State and PAD District a b b 14 10 4 1,617,500 1,205,000 412,500 1,708,500 1,273,500 435,000

  9. Operating Innovative Networks Workshop Series

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operating Innovative Networks Workshop Series Science Engagement Move your data Programs & Workshops CrossConnects Workshop Series Operating Innovative Networks Workshop Series Enlighten Your Research Global Program Science Requirements Reviews Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Operating Innovative

  10. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    07, 2013 DOE-ID Operations Summary For the Period July 8, 2013 through July 28, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced

  11. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2013 DOE-ID Operations Summary For the Period July 29, 2013 through August 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced

  12. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8, 2013 DOE-ID Operations Summary For the Period September 30, 2013 through October 31, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  13. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2014 DOE-ID Operations Summary For the Period November 01, 2013 through November 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  14. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    27, 2014 DOE-ID Operations Summary For the Period December 01, 2013 through January 15, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  15. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, 2015 Updated on April 28, 2015 DOE-ID Operations Summary For the Period September 30, 2014 through November 1, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle

  16. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, 2015 DOE-ID Operations Summary For the Period January 1, 2015 - January 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  17. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6, 2015 DOE-ID Operations Summary For the Period February 1, 2015 - February 28, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  18. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    23, 2015 DOE-ID Operations Summary For the Period March 1, 2015 -March 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  19. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2015 DOE-ID Operations Summary For the Period April 1, 2015 - April 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information about health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  20. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4, 2015 DOE-ID Operations Summary For the Period May 1, 2015 - May 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced

  1. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    25, 2015 DOE-ID Operations Summary For the Period June 1, 2015 - June 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced

  2. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 2, 2015 DOE-ID Operations Summary For the Period September 1, 2015 - September 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208)

  3. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7, 2015 DOE-ID Operations Summary For the Period August 1, 2015 - August 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  4. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    February 11, 2016 DOE-ID Operations Summary For the Period November 1, 2015 - November 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208)

  5. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 1, 2015 -December 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Idaho Operations Office (DOE-ID) December 17: The

  6. Vice President, Transmission System Operations

    Broader source: Energy.gov [DOE]

    The VP for Transmission System Operations provides strategic leadership, direction, and oversight of the people, business processes, and systems that are responsible for the safe, reliable, and...

  7. SPECTR System Operational Test Report

    SciTech Connect (OSTI)

    W.H. Landman Jr.

    2011-08-01

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  8. Operations Division at Berkeley Lab

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    deliver exceptional operational services in support of the scientific mission of Berkeley Lab. Vision Berkeley Lab will be the best place in the world to conduct scientific...

  9. Project Analysis Standard Operating Procedure

    Office of Environmental Management (EM)

    Standard Operating Procedure (EPASOP) Issued by Office of Acquisition and Project Management MA-63 March 12, 2014 DEPARTMENT OF ENERGY Office of Acquisition and Project...

  10. The effects of overwinter flowson the spring condition of rainbow and brown trout size classes in the Green River downstream of Flaming Gorge Dam, Utah.

    SciTech Connect (OSTI)

    Magnusson, A. K.; LaGory, K. E.; Hayse, J. W.; Environmental Science Division

    2010-06-25

    Flaming Gorge Dam, a hydroelectric facility operated by the Bureau of Reclamation (Reclamation), is located on the Green River in Daggett County, northeastern Utah. Until recently, and since the early 1990s, single daily peak releases or steady flows have been the operational pattern of the dam during the winter period. However, releases from Flaming Gorge Reservoir followed a double-peak pattern (two daily flow peaks) during the winters of 2006-2007 and 2008-2009. Because there is little recent long-term history of double-peaking at Flaming Gorge Dam, the potential effects of double-peaking operations on trout body condition in the dam's tailwater are not known. A study plan was developed that identified research activities to evaluate potential effects from winter double-peaking operations (Hayse et al. 2009). Along with other tasks, the study plan identified the need to conduct a statistical analysis of historical trout condition and macroinvertebrate abundance to evaluate the potential effects of hydropower operations. The results from analyses based on the combined size classes of trout (85-630 mm) were presented in Magnusson et al. (2008). The results of this earlier analysis suggested possible relationships between trout condition and flow, but concern that some of the relationships resulted from size-based effects (e.g., apparent changes in condition may have been related to concomitant changes in size distribution, because small trout may have responded differently to flow than large trout) prompted additional analysis of within-size class relationships. This report presents the results of analyses of three different size classes of trout (small: 200-299 mm, medium: 300-399 mm, and large: {ge}400 mm body length). We analyzed historical data to (1) describe temporal patterns and relationships among flows, benthic macroinvertebrate abundance, and condition of brown trout (Salmo trutta) and rainbow trout (Oncorhynchus mykiss) in the tailwaters of Flaming Gorge Dam, and to (2) evaluate the relative importance of the effects of flow (i.e., flow volumes and flow variability), trout abundance (catch per unit effort [CPUE]), and benthic macroinvertebrate abundance on trout condition for different size classes of trout.

  11. Glen Ganyon Dam, Colorado River Storage Project, Arizona. The short-run economic cost of environmental constraints on hydropower operations. Final report

    SciTech Connect (OSTI)

    Harpman, D.A.

    1997-06-01

    In October of 1995, the Secretary of the Interior announced that Glen Canyon Dam would be operated under the Modified Low Fluctuating Flow (MLFF) criteria to protect downstream archeological, cultural, aquatic and riparian resources. Although the annual and monthly amounts of water released downstream remain the same, MLFF imposes a unique and complex set of constraints on hourly and daily hydropower operations. These constraints include restrictions on ramp rates (hourly rate of change in release), minimum flows, maximum flows, and the daily change in flow. In addition, a key component of MLFF operations is adaptive management which establishes a framework of research and monitoring on which future changes in operation will be based. Consequently, MLFF operations are not static and variants of these hourly constraints may be contemplated in the future. This paper summarizes the environmental concerns which led to MLFF, reviews some pertinent electric power concepts, and describes current institutional and market conditions. A generalized method for simulating and valuing hourly hydroelectric generation under various operational constraints is then introduced.

  12. DOE Corporate Operating Experience Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-06-12

    The Order establishes a DOE wide program for management of operating experience to prevent adverse operating incidents and to expand the sharing of good work practices among DOE sites. Canceled by DOE O 210.2A. Does not cancel other directives.

  13. Office of Emergency Operations | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Office of Emergency Operations

  14. Transportation System Concept of Operations

    SciTech Connect (OSTI)

    N. Slater-Thompson

    2006-08-16

    The Nuclear Waste Policy Act of 1982 (NWPA), as amended, authorized the DOE to develop and manage a Federal system for the disposal of SNF and HLW. OCRWM was created to manage acceptance and disposal of SNF and HLW in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. This responsibility includes managing the transportation of SNF and HLW from origin sites to the Repository for disposal. The Transportation System Concept of Operations is the core high-level OCRWM document written to describe the Transportation System integrated design and present the vision, mission, and goals for Transportation System operations. By defining the functions, processes, and critical interfaces of this system early in the system development phase, programmatic risks are minimized, system costs are contained, and system operations are better managed, safer, and more secure. This document also facilitates discussions and understanding among parties responsible for the design, development, and operation of the Transportation System. Such understanding is important for the timely development of system requirements and identification of system interfaces. Information provided in the Transportation System Concept of Operations includes: the functions and key components of the Transportation System; system component interactions; flows of information within the system; the general operating sequences; and the internal and external factors affecting transportation operations. The Transportation System Concept of Operations reflects OCRWM's overall waste management system policies and mission objectives, and as such provides a description of the preferred state of system operation. The description of general Transportation System operating functions in the Transportation System Concept of Operations is the first step in the OCRWM systems engineering process, establishing the starting point for the lower level descriptions. of subsystems and components, and the Transportation System Requirements Document. Other program and system documents, plans, instructions, and detailed designs will be consistent with and informed by the Transportation System Concept of Operations. The Transportation System Concept of Operations is a living document, enduring throughout the OCRWM systems engineering lifecycle. It will undergo formal approval and controlled revisions as appropriate while the Transportation System matures. Revisions will take into account new policy decisions, new information available through system modeling, engineering investigations, technical analyses and tests, and the introduction of new technologies that can demonstrably improve system performance.

  15. Cryogenic pellet production developments for long-pulse plasma operation

    SciTech Connect (OSTI)

    Meitner, S. J.; Baylor, L. R.; Combs, S. K.; Fehling, D. T.; McGill, J. M.; Duckworth, R. C.; McGinnis, W. D.; Rasmussen, D. A.

    2014-01-29

    Long pulse plasma operation on large magnetic fusion devices require multiple forms of cryogenically formed pellets for plasma fueling, on-demand edge localized mode (ELM) triggering, radiative cooling of the divertor, and impurity transport studies. The solid deuterium fueling and ELM triggering pellets can be formed by extrusions created by helium cooled, twin-screw extruder based injection system that freezes deuterium in the screw section. A solenoid actuated cutter mechanism is activated to cut the pellets from the extrusion, inserting them into the barrel, and then fired by the pneumatic valve pulse of high pressure gas. Fuel pellets are injected at a rate up to 10 Hz, and ELM triggering pellets are injected at rates up to 20 Hz. The radiative cooling and impurity transport study pellets are produced by introducing impurity gas into a helium cooled section of a pipe gun where it deposits in-situ. A pneumatic valve is opened and propellant gas is released downstream where it encounters a passive punch which initially accelerates the pellet before the gas flow around the finishes the pellet acceleration. This paper discusses the various cryogenic pellet production techniques based on the twin-screw extruder, pipe gun, and pellet punch designs.

  16. Refinery Capacity Report

    U.S. Energy Information Administration (EIA) Indexed Site

    5 Idle Operating Total Stream Day Barrels per Idle Operating Total Calendar Day Barrels per Atmospheric Crude Oil Distillation Capacity Idle Operating Total Operable Refineries Number of State and PAD District a b b 9 9 0 1,268,500 1,236,500 32,000 1,332,000 1,297,000 35,000 ............................................................................................................................................... PAD District I 1 1 0 182,200 182,200 0 190,200 190,200 0

  17. Operations and Maintenance Best Practices Guide | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operations and Maintenance Best Practices Guide Operations and Maintenance Best Practices Guide The Federal Energy Management Program's Operations and Maintenance (O&M) Best ...

  18. Nuclear Operations | National Nuclear Security Administration

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Operations The SFO Nuclear Operations office is responsible for direction, day-to-day oversight and contract administration activities regarding safe nuclear operations in ...

  19. Independent Oversight Review, Richland Operations Office - November...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Richland Operations Office - November 2012 Independent Oversight Review, Richland Operations Office - November 2012 November 2012 Review of the Richland Operations Office Oversight...

  20. Operational Awareness Records and Activity Reports | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operational Awareness Records and Activity Reports Operational Awareness Records and Activity Reports December 10, 2015 Enterprise Assessments Operational Awareness Record for the...

  1. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Sas-Jaworsky, A. II )

    1991-12-01

    This article outlines the minimum safety requirements that should be considered for onshore and offshore oil well service operations with coiled tubing equipment. These guidelines comply with Minerals Management Service (MMS) regulations issued on May 31, 1988, for offshore work. Where specific MMS regulations are sited, the regulation reference, Incident of Non-Compliance (INC), number is provided. These guidelines can be used by operators and contractors, and although U.S. offshore operations are emphasized, they are applicable wherever coiled tubing services are used.

  2. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 5, 2013 DOE-ID Operations Summary For the Period May 16, through May 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993.

  3. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    24, 2013 DOE-ID Operations Summary For the Period May 30, 2013 through June 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993.

  4. High Temperature Electrolysis Pressurized Experiment Design, Operation, and Results

    SciTech Connect (OSTI)

    J.E. O'Brien; X. Zhang; G.K. Housley; K. DeWall; L. Moore-McAteer

    2012-09-01

    A new facility has been developed at the Idaho National Laboratory for pressurized testing of solid oxide electrolysis stacks. Pressurized operation is envisioned for large-scale hydrogen production plants, yielding higher overall efficiencies when the hydrogen product is to be delivered at elevated pressure for tank storage or pipelines. Pressurized operation also supports higher mass flow rates of the process gases with smaller components. The test stand can accommodate planar cells with dimensions up to 8.5 cm x 8.5 cm and stacks of up to 25 cells. It is also suitable for testing other cell and stack geometries including tubular cells. The pressure boundary for these tests is a water-cooled spool-piece pressure vessel designed for operation up to 5 MPa. Pressurized operation of a ten-cell internally manifolded solid oxide electrolysis stack has been successfully demonstrated up 1.5 MPa. The stack is internally manifolded and operates in cross-flow with an inverted-U flow pattern. Feed-throughs for gas inlets/outlets, power, and instrumentation are all located in the bottom flange. The entire spool piece, with the exception of the bottom flange, can be lifted to allow access to the internal furnace and test fixture. Lifting is accomplished with a motorized threaded drive mechanism attached to a rigid structural frame. Stack mechanical compression is accomplished using springs that are located inside of the pressure boundary, but outside of the hot zone. Initial stack heatup and performance characterization occurs at ambient pressure followed by lowering and sealing of the pressure vessel and subsequent pressurization. Pressure equalization between the anode and cathode sides of the cells and the stack surroundings is ensured by combining all of the process gases downstream of the stack. Steady pressure is maintained by means of a backpressure regulator and a digital pressure controller. A full description of the pressurized test apparatus is provided in this report. Results of initial testing showed the expected increase in open-cell voltage associated with elevated pressure. However, stack performance in terms of area-specific resistance was enhanced at elevated pressure due to better gas diffusion through the porous electrodes of the cells. Some issues such as cracked cells and seals were encountered during testing. Full resolution of these issues will require additional testing to identify the optimum test configurations and protocols.

  5. An operational subsea wireline system

    SciTech Connect (OSTI)

    Dines, C.; Cowan, P.; Headworth, C.

    1989-02-01

    This paper describes an operational subsea wireline system that is self-contained and flexible and offers a safe, economical, and proven method for riserless re-entry into any subsea well.

  6. LCLS Operations Schedule January February...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Schedule January February March April May June July August September October November December 2009 Run 1 Oct. 1-Dec. 17 2010 Run 2 Run 3 May 6 - Sep. 13 Oct. 7 - Dec....

  7. Lease Operations Environmental Guidance Document

    SciTech Connect (OSTI)

    Bureau of Land Management

    2001-02-14

    This report contains discussions in nine different areas as follows: (1) Good Lease Operating Practices; (2) Site Assessment and Sampling; (3) Spills/Accidents; (4) Containment and Disposal of Produced Waters; (5) Restoration of Hydrocarbon Impacted Soils; (6) Restoration of Salt Impacted Soils; (7) Pit Closures; (8) Identification, Removal and Disposal of Naturally Occurring Radioactive Materials (NORM); and (9) Site Closure and Construction Methods for Abandonment Wells/Locations. This report is primary directed towards the operation of oil and gas producing wells.

  8. Reactor operation safety information document

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

  9. WIPP Activates Emergency Operations Center

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    August 5, 2015 WIPP Activates Emergency Operations Center At approximately 7:00 p.m. MDT on Tuesday, August 4, the Waste Isolation Pilot Plant (WIPP) activated the Emergency Operations Center (EOC) and the Joint Information Center (JIC) after a radiological control technician detected what was believed to be elevated radiological readings on a filter from an air particulate sampler located where air is exhausted from the WIPP underground. It was later determined that an error was made in the

  10. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    November 1, 2014 - November 30, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP)

  11. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 1, 2014 - December 31, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP)

  12. DOE-ID Operations Summary

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    January 1, 2016 -February 29, 2016 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP)

  13. Working and Net Available Shell Storage Capacity

    U.S. Energy Information Administration (EIA) Indexed Site

    Net Available Shell Storage Capacity by PAD District as of September 30, 2015 (Thousand Barrels) Commodity In Operation Idle 1 In Operation Idle 1 In Operation Idle 1 In Operation Idle 1 In Operation Idle 1 In Operation Idle 1 Refineries Crude Oil 16,853 981 24,677 733 91,650 2,192 4,748 137 40,924 2,201 178,852 6,244 Fuel Ethanol 174 - 171 - 309 - 144 6 77 9 875 15 Natural Gas Plant Liquids and Liquefied Refinery Gases 2 1,328 21 12,256 270 31,315 92 608 1 2,470 - 47,977 384 Propane/Propylene

  14. External Independent Review (EIR) Standard Operating Procedure...

    Broader source: Energy.gov (indexed) [DOE]

    External Independent Review (EIR) Standard Operating Procedure (SOP) - September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure...

  15. Operations & Maintenance Best Practices Guide: Chapter 6

    Broader source: Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  16. Operations & Maintenance Best Practices Guide: Chapter 9

    Broader source: Energy.gov [DOE]

    Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  17. PNNL Electricity Infrastructure Operations Center | Open Energy...

    Open Energy Info (EERE)

    PNNL Electricity Infrastructure Operations Center (Redirected from Electricity Infrastructure Operations Center) Jump to: navigation, search Logo: Electricity Infrastructure...

  18. Operations & Maintenance Best Practices Guide: Appendix a

    Broader source: Energy.gov [DOE]

    Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  19. Operations & Maintenance Best Practices Guide: Front Matter

    Broader source: Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  20. Operations & Maintenance Best Practices Guide: Appendix d

    Broader source: Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  1. Operations & Maintenance Best Practices Guide: Chapter 2

    Broader source: Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  2. Operations & Maintenance Best Practices Guide: Chapter 1

    Broader source: Energy.gov [DOE]

    Guide describes chapter 1 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  3. Operations & Maintenance Best Practices Guide: Chapter 5

    Broader source: Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  4. Operations & Maintenance Best Practices Guide: Chapter 8

    Broader source: Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  5. Operations & Maintenance Best Practices Guide: Chapter 7

    Broader source: Energy.gov [DOE]

    Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  6. Operations & Maintenance Best Practices Guide: Chapter 10

    Broader source: Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  7. Operations & Maintenance Best Practices Guide: Appendix c

    Broader source: Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  8. Operations & Maintenance Best Practices Guide: Appendix B

    Broader source: Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  9. Operations & Maintenance Best Practices Guide: Chapter 11

    Broader source: Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  10. Defense waste processing facility radioactive operations. Part 1 - operating experience

    SciTech Connect (OSTI)

    Little, D.B.; Gee, J.T.; Barnes, W.M.

    1997-12-31

    The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation`s first and the world`s largest vitrification facility. Following a ten year construction program and a 3 year non-radioactive test program, DWPF began radioactive operations in March 1996. This paper presents the results of the first 9 months of radioactive operations. Topics include: operations of the remote processing equipment reliability, and decontamination facilities for the remote processing equipment. Key equipment discussed includes process pumps, telerobotic manipulators, infrared camera, Holledge{trademark} level gauges and in-cell (remote) cranes. Information is presented regarding equipment at the conclusion of the DWPF test program it also discussed, with special emphasis on agitator blades and cooling/heating coil wear. 3 refs., 4 figs.

  11. Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    oak ridge 12 ...... Prepared by the Operational Readiness Team: OPERATIONAL READINESS REVIEW PLAN FOR THE RAD1 0 1 SOT0 PE THERMOELECTRIC GENERATOR MATERIALS PRODUCTION TASKS R. H. Cooper M. M. Martin C. R. Riggs R. L. Beatty E. K. Ohriner R. N. Escher OISTRIBUTIQM OF THIS DOCUMENT IS UNLIMITED DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency Thereof, nor any of their employees,

  12. Coiled tubing; Operations and services

    SciTech Connect (OSTI)

    Welch, J.L. ); Whitlow, R.R. )

    1992-07-01

    This paper reports that pulling tubing to clean out a production liner at Prudhoe Bay Unit Western Operating Area (PBU WOA) averages $600,000 to $800,000. Coiled tubing underreaming was developed to accomplish this objective at lower costs. Beginning in 1988, these operations have been improved through several generations of procedures and tool designs. Using current technology, the underreamer, in conjunction with coiled tubing, can reduce the cost of drilling out to a liner to about $50,000 or $100,000, depending on the amount and type of material to be removed. PBU WOA, operated by BP Exploration, produces about 600,000 bopd from 395 wells. Another 61 wells are used to inject produced water, seawater and miscible fluids. Most of the remedial well servicing operations are conducted using coiled tubing (CT). Three contract coiled tubing units (CTUs) work daily, performing wellbore cleanouts, stimulations, inflatable bridge plug installations and cement squeeze operations. About 42 underreaming jobs were performed from 1990 to 1991 at PBU WOA for an average cost of between $75,000 and $100,000, a cost savings of $500,000 power well compared to pulling tubing and cleaning out the wells conventionally.

  13. Low pressure EGR system having full range capability

    DOE Patents [OSTI]

    Easley, Jr., William Lanier; Milam, David Michael; Roozenboom, Stephan Donald; Bond, Michael Steven; Kapic, Amir

    2009-09-22

    An exhaust treatment system for an engine is disclosed and may have an air induction circuit, an exhaust circuit, and an exhaust recirculation circuit. The air induction circuit may be configured to direct air into the engine. The exhaust circuit may be configured to direct exhaust from the engine and include a turbine driven by the exhaust, a particulate filter disposed in series with and downstream of the turbine, and a catalytic device disposed in series with and downstream of the particulate filter. The exhaust recirculation circuit may be configured to selectively redirect at least some of the exhaust from between the particulate filter and the catalytic device to the air induction circuit. The catalytic device is selected to create backpressure within the exhaust circuit sufficient to ensure that, under normal engine operating conditions above low idle, exhaust can flow into the air induction circuit without throttling of the air.

  14. Performing a local barrier operation

    DOE Patents [OSTI]

    Archer, Charles J; Blocksome, Michael A; Ratterman, Joseph D; Smith, Brian E

    2014-03-04

    Performing a local barrier operation with parallel tasks executing on a compute node including, for each task: retrieving a present value of a counter; calculating, in dependence upon the present value of the counter and a total number of tasks performing the local barrier operation, a base value, the base value representing the counter's value prior to any task joining the local barrier; calculating, in dependence upon the base value and the total number of tasks performing the local barrier operation, a target value of the counter, the target value representing the counter's value when all tasks have joined the local barrier; joining the local barrier, including atomically incrementing the value of the counter; and repetitively, until the present value of the counter is no less than the target value of the counter: retrieving the present value of the counter and determining whether the present value equals the target value.

  15. Performing a local barrier operation

    DOE Patents [OSTI]

    Archer, Charles J; Blocksome, Michael A; Ratterman, Joseph D; Smith, Brian E

    2014-03-04

    Performing a local barrier operation with parallel tasks executing on a compute node including, for each task: retrieving a present value of a counter; calculating, in dependence upon the present value of the counter and a total number of tasks performing the local barrier operation, a base value of the counter, the base value representing the counter's value prior to any task joining the local barrier; calculating, in dependence upon the base value and the total number of tasks performing the local barrier operation, a target value, the target value representing the counter's value when all tasks have joined the local barrier; joining the local barrier, including atomically incrementing the value of the counter; and repetitively, until the present value of the counter is no less than the target value of the counter: retrieving the present value of the counter and determining whether the present value equals the target value.

  16. Turnaround team revitalizes mining operations

    SciTech Connect (OSTI)

    Buchsbaum, L.

    2005-11-01

    Starting from scratch, the Broe Companies' Century Coal trains the next generation. The article describes how the newly created Century Coal LLC, controlled by Denver-based Broe Companies investment firm, is rebuilding and expanding its highwall mining operations, increasing production from a current 1 million tons to 5 to 6 million tons in 2006 and 2007. The company has a $100,000 outreach program with 95% of these funds going to local communities. Present coal mining operations are spread around Bell, Clay, Harlan Knox and Leslie Counties. A priority is the renovation of the WenLar preparation plant in Bell County. 5 photos.

  17. Electrochemical cell operation and system

    DOE Patents [OSTI]

    Maru, Hansraj C.

    1980-03-11

    Thermal control in fuel cell operation is affected through sensible heat of process gas by providing common input manifolding of the cell gas flow passage in communication with the cell electrolyte and an additional gas flow passage which is isolated from the cell electrolyte and in thermal communication with a heat-generating surface of the cell. Flow level in the cell gas flow passage is selected based on desired output electrical energy and flow level in the additional gas flow passage is selected in accordance with desired cell operating temperature.

  18. Emergency Operating Records Protection Program

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1991-10-23

    To establish the policy, responsibilities, and requirements for a Departmental Emergency Operating Records Protection Program to safeguard that core or records deemed necessary to assure continuity of essential Governmental activities during and following disaster and attack-related emergency conditions. Cancels DOE 5500.7A. Chanceled by DOE O 151.1 of 9-25-1995.

  19. Auditing of Programs and Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-11-09

    To set forth audit requirements and responsibilities for the promotion of economy and efficiency in the administration of or the prevention or detection of fraud, waste, and abuse in programs and operations of the Department of Energy. Supersedes DOE O 224.2.

  20. Signal and Image Processing Operations

    Energy Science and Technology Software Center (OSTI)

    1995-05-10

    VIEW is a software system for processing arbitrary multidimensional signals. It provides facilities for numerical operations, signal displays, and signal databasing. The major emphasis of the system is on the processing of time-sequences and multidimensional images. The system is designed to be both portable and extensible. It runs currently on UNIX systems, primarily SUN workstations.

  1. Auditing of Programs and Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-03-22

    To set forth audit responsibilities for the promotion of economy and efficiency in the administration of, or the prevention or detection of fraud, waste, and abuse in, programs and operations of the Department of Energy (DOE). Cancels DOE 2321.1B. Canceled by DOE O 224.2A.

  2. Risk assessment in international operations

    SciTech Connect (OSTI)

    Stricklin, Daniela L.

    2008-11-15

    During international peace-keeping missions, a diverse number of non-battle hazards may be encountered, which range from heavily polluted areas, endemic disease, toxic industrial materials, local violence, traffic, and even psychological factors. Hence, elevated risk levels from a variety of sources are encountered during deployments. With the emphasis within the Swedish military moving from national defense towards prioritization of international missions in atypical environments, the risk of health consequences, including long term health effects, has received greater consideration. The Swedish military is interested in designing an optimal approach for assessment of health threats during deployments. The Medical Intelligence group at FOI CBRN Security and Defence in Umea has, on request from and in collaboration with the Swedish Armed Forces, reviewed a variety of international health threat and risk assessment models for military operations. Application of risk assessment methods used in different phases of military operations will be reviewed. An overview of different international approaches used in operational risk management (ORM) will be presented as well as a discussion of the specific needs and constraints for health risk assessment in military operations. This work highlights the specific challenges of risk assessment that are unique to the deployment setting such as the assessment of exposures to a variety of diverse hazards concurrently.

  3. Coiled tubing operations and services

    SciTech Connect (OSTI)

    Jaworsky, A.S. II )

    1991-11-01

    Coiled tubing offers many advantages over conventional jointed tubing used for drilling in oil fields, including time savings, pumping flexibility, fluid placement, reduced formation damage and safety. The article gives an overview of coiled tubing history and development. Operating concepts are explained, along with descriptions of the major equipment and components associated with coiled tubing use in the oil field today.

  4. COE1 Calorimeter Operations Manual

    SciTech Connect (OSTI)

    Santi, Peter Angelo

    2015-12-15

    The purpose of this manual is to describe the operations of the COE1 calorimeter which is used to measure the thermal power generated by the radioactive decay of plutonium-bearing materials for the purposes of assaying the amount of plutonium within the material.

  5. Safety of Nuclear Explosive Operations

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-08-07

    This directive establishes responsibilities and requirements to ensure the safety of routine and planned nuclear explosive operations and associated activities and facilities. Cancels DOE O 452.2A and DOE G 452.2A-1A. Canceled by DOE O 452.2C.

  6. Natural Gas Weekly Update, Printer-Friendly Version

    Gasoline and Diesel Fuel Update (EIA)

    idle since mid-December 2008. According to the companys press release, Terras methanol, ammonia, and nitrogen plants have resumed operations. Mosaic Company also restarted...

  7. Natural Gas Weekly Update

    Gasoline and Diesel Fuel Update (EIA)

    idle since mid-December 2008. According to the companys press release, Terras methanol, ammonia, and nitrogen plants have resumed operations. Mosaic Company also restarted...

  8. Stratified charge internal combustion engine

    SciTech Connect (OSTI)

    Skopil, A.O.

    1991-01-01

    This patent describes an internal combustion engine. It comprises: a main cylinder, a main piston within the main cylinder, and means for delivering a combustible charge into the main cylinder; a smaller idle cylinder, and idle piston within the idle cylinder, and means for delivering a combustible charge into the idle cylinder; an ignition passageway leading from the idle cylinder to the main cylinder; and an ignition device within the ignition passageway operable to ignite a compressed charge discharged by the idle cylinder into the ignition passageway. The passageway being positioned to discharge the ignited compressed charge from the idle cylinder into the main cylinder to ignite the compressed charge within the main cylinder.

  9. LANL continuity of operations plan

    SciTech Connect (OSTI)

    Senutovitch, Diane M

    2010-12-22

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an allhazards event, including a national security emergency, major fire, catastrophic natural disaster, man-made disaster, terrorism event, or technological disaster by rendering LANL buildings, infrastructure, or Technical Areas unsafe, temporarily unusable, or inaccessible.

  10. Effect of Coal Properties and Operation Conditions on Flow Behavior of Coal Slag in Entrained Flow Gasifiers: A Brief Review

    SciTech Connect (OSTI)

    Wang,Ping; Massoudi, Mehrdad

    2011-01-01

    Integrated gasification combined cycle (IGCC) is a potentially promising clean technology with an inherent advantage of low emissions, since the process removes contaminants before combustion instead of from flue gas after combustion, as in a conventional coal steam plant. In addition, IGCC has potential for cost-effective carbon dioxide capture. Availability and high capital costs are the main challenges to making IGCC technology more competitive and fully commercial. Experiences from demonstrated IGCC plants show that, in the gasification system, low availability is largely due to slag buildup in the gasifier and fouling in the syngas cooler downstream of the gasification system. In the entrained flow gasifiers used in IGCC plants, the majority of mineral matter transforms to liquid slag on the wall of the gasifier and flows out the bottom. However, a small fraction of the mineral matter (as fly ash) is entrained with the raw syngas out of the gasifier to downstream processing. This molten/sticky fly ash could cause fouling of the syngas cooler. Therefore, it is preferable to minimize the quantity of fly ash and maximize slag. In addition, the hot raw syngas is cooled to convert any entrained molten fly slag to hardened solid fly ash prior to entering the syngas cooler. To improve gasification availability through better design and operation of the gasification process, better understanding of slag behavior and characteristics of the slagging process are needed. Slagging behavior is affected by char/ash properties, gas compositions in the gasifier, the gasifier wall structure, fluid dynamics, and plant operating conditions (mainly temperature and oxygen/carbon ratio). The viscosity of the slag is used to characterize the behavior of the slag flow and is the dominating factor to determine the probability that ash particles will stick. Slag viscosity strongly depends on the temperature and chemical composition of the slag. Because coal has varying ash content and composition, different operating conditions are required to maintain the slag flow and limit problems downstream. This report briefly introduces the IGCC process, the gasification process, and the main types and operating conditions of entrained flow gasifiers used in IGCC plants. This report also discusses the effects of coal ash and slag properties on slag flow and its qualities required for the entrained flow gasifier. Finally this report will identify the key operating conditions affecting slag flow behaviors, including temperature, oxygen/coal ratio, and flux agents.

  11. Emergency Operations Training Academy | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration Emergency Operations Training Academy Emergency Operations Training Academy The Office of Emergency Operations, NA-40-The Emergency Operations Training Academy (EOTA) EOTA provides training and education to enhance the readiness of personnel in the radiological-nuclear emergency operations community. For more information or to contact us, visit the EOTA website at

  12. Recovering entanglement by local operations

    SciTech Connect (OSTI)

    D’Arrigo, A.; Lo Franco, R.; Benenti, G.; Paladino, E.; Falci, G.

    2014-11-15

    We investigate the phenomenon of bipartite entanglement revivals under purely local operations in systems subject to local and independent classical noise sources. We explain this apparent paradox in the physical ensemble description of the system state by introducing the concept of “hidden” entanglement, which indicates the amount of entanglement that cannot be exploited due to the lack of classical information on the system. For this reason this part of entanglement can be recovered without the action of non-local operations or back-transfer process. For two noninteracting qubits under a low-frequency stochastic noise, we show that entanglement can be recovered by local pulses only. We also discuss how hidden entanglement may provide new insights about entanglement revivals in non-Markovian dynamics.

  13. Fermilab SRF cryomodule operational experience

    SciTech Connect (OSTI)

    Martinez, A.; Klebaner, A.L.; Theilacker, J.C.; DeGraff, B.D.; White, M.; Johnson, G.S.; /Fermilab

    2011-06-01

    Fermi National Accelerator Laboratory is constructing an Advanced Accelerator Research and Development facility at New Muon Lab. The cryogenic infrastructure in support of the initial phase of the facility consists of two Tevatron style standalone refrigerators, cryogenic distribution system as well as an ambient temperature pumping system to achieve 2K operations with supporting purification systems. During this phase of the project a single Type III plus 1.3 GHz cryomodule was installed, cooled and tested. Design constraints of the cryomodule required that the cryomodule individual circuits be cooled at predetermined rates. These constraints required special design solutions to achieve. This paper describes the initial cooldown and operational experience of a 1.3 GHz cryomodule using the New Muon Lab cryogenic system.

  14. Reactor operation environmental information document

    SciTech Connect (OSTI)

    Haselow, J.S.; Price, V.; Stephenson, D.E.; Bledsoe, H.W.; Looney, B.B.

    1989-12-01

    The Savannah River Site (SRS) produces nuclear materials, primarily plutonium and tritium, to meet the requirements of the Department of Defense. These products have been formed in nuclear reactors that were built during 1950--1955 at the SRS. K, L, and P reactors are three of five reactors that have been used in the past to produce the nuclear materials. All three of these reactors discontinued operation in 1988. Currently, intense efforts are being extended to prepare these three reactors for restart in a manner that protects human health and the environment. To document that restarting the reactors will have minimal impacts to human health and the environment, a three-volume Reactor Operations Environmental Impact Document has been prepared. The document focuses on the impacts of restarting the K, L, and P reactors on both the SRS and surrounding areas. This volume discusses the geology, seismology, and subsurface hydrology. 195 refs., 101 figs., 16 tabs.

  15. Operational Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Operational Management The Office of Management supports many leadership responsibilities for the Department of Energy (DOE), providing support for project and contract management and other administrative functions. For example, the office oversees more than $22 billion in annual contract obligations and $2 billion in financial assistance obligations. It supports the management of the Department's multi-billion dollar project portfolio, and provides the Secretary of Energy and senior

  16. TWP-ICE Operations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Plan Peter May, Jim Mather, Christian Jakob, Jay Mace, Greg McFarquhar With contributions from many people Overview The TWPICE experiment will take place from January 21, 2006 through February 13, 2006. During this period, there will be a substantial ground and sea based component as well as NASA, ARM, ARA and UK aircraft. The UK aircraft will also be participating in an experiment in Darwin during November- December 2005. This earlier experiment also involves aircraft associated with

  17. Operation of thoriated tungsten cathodes

    SciTech Connect (OSTI)

    Polk, J.E. )

    1993-01-20

    The operating temperature of thoriated tungsten cathodes used in electric thrusters depends on the surface coverage of thorium, which is determined by a balance of rate processes which supply and deplete the surface layer. The fundamental processes and rates are first reviewed in detail, then a phenomenological model based on these rate processes is described. The model indicates that the thermionic emission capabilities of thoriated tungsten cathodes decay rapidly because of thorium depletion at temperatures encountered in electric thrusters.

  18. Wave-operated power plant

    SciTech Connect (OSTI)

    Ghesquiere, H.

    1980-08-12

    This wave-operated power plant comprises a perforated caisson breakwater in which propellers, or turbines, are mounted in the perforations or openings and drives hydraulic pumps connected thereto, which in turn drives a hydraulic motor coupled to an electric generator. One-way flap valves are mounted in the openings. Some of said flap valves allow the rushing waves to enter the caisson, while the other flap valves allow the water to flow out of the caisson.

  19. Energy San Francisco Operations Office

    Office of Legacy Management (LM)

    Depariment of ' Energy San Francisco Operations Office 1333 Broadway Oakland, California 94612 FEB 6 1984 Mr. c:c. canners Energy Systems Group Rockwell International Corporation Post Office BOX 309 Canoga Park Dear 8 a CA 91304 G ers : Remedial action was taken to decontaminate the Hot Cave (Building 003) and Sodium Reactor Experiment (SRE) under Contract No. DE-AT03-76SF75008. The report of the post remedial survey, performed by Argonne National Laboratory, indicates that the levels of

  20. NEUTRONIC REACTOR CONSTRUCTION AND OPERATION

    DOE Patents [OSTI]

    West, J.M.; Weills, J.T.

    1960-03-15

    A method is given for operating a nuclear reactor having a negative coefficient of reactivity to compensate for the change in reactor reactivity due to the burn-up of the xenon peak following start-up of the reactor. When it is desired to start up the reactor within less than 72 hours after shutdown, the temperature of the reactor is lowered prior to start-up, and then gradually raised after start-up.

  1. Office of Headquarters Security Operations

    Broader source: Energy.gov [DOE]

    The Office of Headquarters Security Operations strengthens national security by protecting personnel, facilities, property, classified information, and sensitive unclassified information for DOE Headquarters facilities in the National Capital Area under normal and abnormal (i.e., emergency) conditions; managing access authorization functions for Headquarters; ensuring that executives and dignitaries are fully protected, and supporting efforts to ensure the continuity of government in all circumstances as mandated by Presidential Decision Directive.

  2. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Operating Procedure (SOP) October 2008 PDF icon External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 More Documents & Publications Contractor...

  3. Westinghouse Again Recognized For Safe Underground Operations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and operating contractor for DOE at WIPP. The company's underground operations include mining, hoisting, maintenance, engineering and other related activities. The Certificate of...

  4. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in...

  5. Atmospheric Radiation Measurement Climate Research Facility Operations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6-001 Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly ... DOESC-ARM-16-001 Atmospheric Radiation Measurement Climate Research Facility Operations ...

  6. Atmospheric Radiation Measurement Climate Research Facility Operations...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Atmospheric Radiation Measurement Climate Research Facility Operations Quarterly Report ... DOESC-ARM-15-069 Atmospheric Radiation Measurement Climate Research Facility Operations ...

  7. Data Management Facility Operations Plan (Program Document) ...

    Office of Scientific and Technical Information (OSTI)

    Program Document: Data Management Facility Operations Plan Citation Details In-Document Search Title: Data Management Facility Operations Plan The Data Management Facility (DMF) is ...

  8. Nuclear reactor characteristics and operational history

    Annual Energy Outlook [U.S. Energy Information Administration (EIA)]

    Nuclear > U.S. reactor operation status tables Nuclear Reactor Operational Status Tables Release date: November 22, 2011 Next release date: TBD See also: Table 1. Capacity and ...

  9. Operating Plan 573.1-2

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mullens, ESS&H Division, Office of Institutional Operations Approving Official: Thomas Wilson, Jr., Director, Office of Institutional Operations signature s Thomas Wilson, Jr. ...

  10. KJC Operating Company | Open Energy Information

    Open Energy Info (EERE)

    KJC Operating Company Jump to: navigation, search Name: KJC Operating Company Place: Boron, California Zip: 93516 Sector: Solar Product: Developed solar thermal electricity...

  11. AG Plus Co operative | Open Energy Information

    Open Energy Info (EERE)

    Plus Co operative Jump to: navigation, search Name: AG Plus Co-operative Place: SE Kindred, North Dakota Zip: 58051 Product: Cooperative offering membership stock to agricultural...

  12. Reservoir-Stimulation Optimization with Operational Monitoring...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reservoir-Stimulation Optimization with Operational Monitoring for Creation of Enhanced Geothermal Systems Reservoir-Stimulation Optimization with Operational Monitoring for ...

  13. Midwest Independent Transmission System Operator | Open Energy...

    Open Energy Info (EERE)

    Midwest Independent Transmission System Operator Jump to: navigation, search Name: Midwest Independent Transmission System Operator Place: Carmel, IN References: SGIC1 This...

  14. Geisha Williams Executive Vice President, Electric Operations

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Geisha Williams Executive Vice President, Electric Operations Pacific Gas and Electric ... My name is Geisha Williams, and I am the Executive Vice President of Electric Operations ...

  15. Supervisory Operations Research Analyst | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Supervisory Operations Research Analyst Supervisory Operations Research Analyst Submitted by admin on Sat, 2016-01-16 00:16 Job Summary Organization Name Department Of Energy...

  16. Extending the Operating Lives of Materials

    ScienceCinema (OSTI)

    Paul Jablonski

    2010-09-01

    Metallurgist Paul Jablonski discusses his role in developing processes that extend the operating temperatures and operating lives of materials used in energy applications.

  17. Operations Strategic Planning Committee | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Strategic Planning Committee The Operations Strategic Planning Committee has come up with an initial list of new opportunities and opportunities for improvement over the...

  18. Optimizing Installation, Operation, and Maintenance at Offshore...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in the United States Optimizing Installation, Operation, and Maintenance at Offshore Wind Projects in ...

  19. Accelerator Operations and Technology, AOT: LANL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ADE Accelerator and Operations Technology, AOT About Us AOT Home Groups High Power Electrodynamics Instrumentation, Controls Mechanical Design Engineering Operations Radio...

  20. Facilities Operations Specialist | Department of Energy

    Office of Environmental Management (EM)

    Announcement Number DOE-BPA-16-11659-DE Job Summary Ross Facilities Operations and Maintenance operates and maintains the office and light industrial facilities, buildings and...