Sample records for operating contracts dear

  1. DEAR Contract Clause Matrix

    Office of Energy Efficiency and Renewable Energy (EERE)

    Attached for your information is a corrected Department of Energy Acquisition Regulation contract clause matrix. This corrected clause matrix is also being posted to the Stripes library. The earlier edition incorrectly identified 952.204-73 and 952.211-70 as Section K Certifications but they are correctly identified as Section L Instructions. The clause at 952.5223-3 Agreement regarding workplace substance abuse programs at Department of Energy sites has also been added. Thanks to Christopher Miller in Albuquerque for spotting the errors. A revised matrix is attached.

  2. Status Update on Action 2d: Discussion of DEAR ISM Clause in DOE Contracts

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Status Update on Action 2d: Discussion of DEAR ISM Clause in DOE Contracts Status Update on Action 2d: Discussion of DEAR ISM Clause in DOE Contracts Addthis Description Slide Presentation by Patricia Worthington, PhD, Director Office of Health and Safety, Office of Health Safety and Security. Regulatory Aspects of ISM--Evaluating current ISM clause in DOE Contracts

  3. Dear Mr

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mr. Mark Whitney Acting Assistant Secretary for Environmental Management U.S. Department of Energy, EM-1 1000 Independence Avenue, SW Washington, DC 20585 Dear Mr. Whitney: Background The Waste Isolation Pilot Plant (WIPP) was created to safely and reliably dispose of this waste, and did so from 1999 to February 2014. The Waste Isolation Pilot Plant (WIPP) has been operating since 1999 as the only underground repository for transuranic (TRU) waste disposal. Having the WIPP facility available

  4. FAR and DEAR Clause Matrices

    Broader source: Energy.gov [DOE]

    Clause matrices have been prepared for both FAR and DEAR clauses. The matrices are similar to the FAR Matrix found at www.acquisition.gov. The DOE version leaves off several types of contracts we don’t use frequently such as R&D, leasing motor vehicles, communications services and so forth. It adds two types important to DOE, i.e., management and operating contracts and other facility management contracts. It then adds a very important applicability factor not found on the FAR Matrix, namely, Not Applicable. We believe these matrices should be helpful to the acquisition community. They should be considered another tool for your tool chest. Please report any apparent errors or inconsistencies. Our intent is to update them as changes are made to the FAR or DEAR. We will update the appropriate DOE Acquisition Guide chapters to include these.

  5. Contracts

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2.101 July 2016 1 Audit Requirements for Non-Management and Operating Contracts [References: FAR 9.1, FAR 15.404-1, FAR 15.404-2, FAR 31, FAR 32.202-7, FAR 42.1, FAR 42.7, FAR 52.216-7, DEAR 915.404-2-70, and Acquisition Guide Chapter 42.1] 1.0 Summary of Latest Changes This update: (1) provides information regarding an alternative to Defense Contract Audit Agency (DCAA) audit support that is available to Department of Energy (DOE) Contracting Officers, and (2) includes administrative changes.

  6. Dear Mr

    Office of Environmental Management (EM)

    February 27, 2013 Mr. David Huizenga Senior Advisor for Environmental Management U.S. Department of Energy, EM-1 1000 Independence Avenue, SW Washington, DC 20585 Dear Mr....

  7. Dear Mr

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    for Environmental Management U.S. Department of Energy, EM-1 1000 Independence Avenue, SW Washington, DC 20585 Dear Dr. Regalbuto: Background The Department of Energy (DOE)...

  8. FAR and DEAR Clause Matrices

    Broader source: Energy.gov [DOE]

    Policy Flash 2012-09, dated October 21, 2011, forwarded both FAR and DEAR contract clause matrices. The FAR matrix contained 2 errors. It listed FAR 52.215-12 and 13 as Not Applicable although they should be Required When Applicable per DEAR 970.1504-3-1. A corrected matrix is attached.

  9. DEAR 952

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ref: DEAR 952.227-11 (a) Definitions. (1) "Invention" means any invention or discovery which is or may be patentable or otherwise protectable under title 35 of the United States...

  10. Dear Mr

    Office of Environmental Management (EM)

    3 ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD ________________________________________________________________________________________________ Hanford Idaho Nevada Northern New Mexico Oak Ridge Paducah Portsmouth Savannah River ________________________________________________________________________________________________ March 4, 2014 David Huizenga Senior Advisor for Environmental Management U.S. Department of Energy, EM-1 1000 Independence Avenue, SW Washington, DC 20585 Dear

  11. Dear Mr

    Office of Environmental Management (EM)

    2 ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD ________________________________________________________________________________________________ Hanford Idaho Nevada Northern New Mexico Oak Ridge Paducah Portsmouth Savannah River ________________________________________________________________________________________________ March 4, 2014 David Huizenga Senior Advisor for Environmental Management U.S. Department of Energy, EM-1 1000 Independence Avenue, SW Washington, DC 20585 Dear

  12. Dear Mr

    Office of Environmental Management (EM)

    3 ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD ________________________________________________________________________________________________ Hanford Idaho Nevada Northern New Mexico Oak Ridge Paducah Portsmouth Savannah River ________________________________________________________________________________________________ March 4, 2014 David Huizenga Senior Advisor for Environmental Management U.S. Department of Energy, EM-1 1000 Independence Avenue, SW Washington, DC 20585 Dear

  13. Dear Mr

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dr. Monica Regalbuto Assistant Secretary for Environmental Management U.S. Department of Energy, EM-1 1000 Independence Avenue, SW Washington, DC 20585 Dear Dr. Regalbuto: Background The Department of Energy (DOE) Environmental Management (EM) sites with legacy waste awaiting permanent off-site disposal have been, or could be, subject to large fines from their respective regulatory agencies for failure to meet legally mandated deadlines for permanent disposal of legacy waste. For example, the

  14. Dear Colleague,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    , 2011 Dear Colleague, On August 18, 2011, President Obama issued an Executive Order, "Establishing a Coordinated Government-wide Initiative to Promote Diversity and Inclusion in the Federal Workforce," directing Federal agencies to develop strategic plans to recruit and retain a more diverse workforce. It calls for the Office of Personnel Management, along with the Office of Management and Budget and the Equal Employment Opportunity Commission, to release a strategic government-wide

  15. Dear Ms

    Office of Environmental Management (EM)

    31, 2012 Office of the General Counsel, Department of Energy Dear Mr. Cohen, Unfortunately we missed the dead line for the first set of comments regarding regulatory burden. We've searched the web at http://www.regulations.gov for any comments from the first round due on January 5, 2012 and could not find any. The situation we described last year (see below) has not improved. We are waiting for additional rules from DOE but don't believe they'll provide the needed relief from regulatory burden.

  16. Tank Operations Contract Section J Contract No. DE-AC27-08RV14800...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    EVALUATION AND MEASUREMENT PLAN (PEMP) Tank Operations Contract Section J Contract No. ... Performance Evaluation Board PEMP ......

  17. Consent to Subcontracts under Management and Operating (M&O) Contracts

    Broader source: Energy.gov [DOE]

    Reference earlier Policy Flash 2011-103, Consent to Subcontracts on Management and Operating Contracts. The Flash had discussed the possibility of an Acquisition Letter and possibly a DEAR amendment to improve Consent to Subcontract efficiency and to ensure we apply our limited resources to those subcontract actions that truly pose the most risk. Closer analysis revealed that only a change to Acquisition Guide Chapter 70.7, Chapter 10, paragraph B, was needed to accomplish these process improvements. The revised chapter has been issued. A copy is attached.

  18. DOE to Compete Contract for Management and Operation of Pacific...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Compete Contract for Management and Operation of Pacific Northwest National Laboratory DOE to Compete Contract for Management and Operation of Pacific Northwest National ...

  19. Acquisition Planning--Extending A Management and Operating Contract...

    Energy Savers [EERE]

    Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Acquisition Planning--Extending A Management and Operating Contract Without ...

  20. Energy Department Awards New Contract to Manage and Operate Brookhaven...

    Office of Environmental Management (EM)

    New Contract to Manage and Operate Brookhaven National Laboratory Energy Department Awards New Contract to Manage and Operate Brookhaven National Laboratory November 12, 2014 - ...

  1. Department of Energy to Compete Management & Operating Contract...

    Energy Savers [EERE]

    & Operating Contract for its National Renewable Energy Laboratory Department of Energy to Compete Management & Operating Contract for its National Renewable Energy Laboratory June ...

  2. DOE Extends Contract to Operate Depleted Uranium Hexafluoride...

    Energy Savers [EERE]

    Extends Contract to Operate Depleted Uranium Hexafluoride Conversion Plants DOE Extends Contract to Operate Depleted Uranium Hexafluoride Conversion Plants December 24, 2015 - ...

  3. Dear Mr. Cohen,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    31, 2012 Office of the General Counsel, Department of Energy Dear Mr. Cohen, Unfortunately we missed the dead line for the first set of comments regarding regulatory burden. We've ...

  4. Department of Energy Management and Operating Form of Contract | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy Management and Operating Form of Contract Department of Energy Management and Operating Form of Contract PF2008-01.pdf (81.18 KB) PF2008-01a - Acquisition Guide - Chapter 17.6 - Management and Operating (M&O) form of contract (111.74 KB) More Documents & Publications OPAM Policy Acquisition Guides Chapter 17 - Special Contracting Methods Management Reserve and Contingency

  5. Dear Mayor Hasloff:

    Office of Legacy Management (LM)

    Department of Emgy,, Washington; DC 20585 ,' .. APR 0 3' 1995 7.' " :.' ' - ' . ; ., :. ; "?S ! 0: iii city County"Duilding : Pittsburgh, Pennsylvania 15219 Dear Mayor Hasloff: Secretary of Energy Hazel O'Leary has' announced a new approach to openness in the Department of Energy (DOE) and its communications with the public. ,In support of this initiative, we are pleased to forward'the enclosed.information related to ttie former Koppers Co., Inc. site inyour jurisdiction that.

  6. Security Clause, DEAR 952.204-2

    Office of Energy Efficiency and Renewable Energy (EERE)

    The DOE Security Clause, DEAR 952.204-2, was amended on May 18, 2009 to augment the background check requirement and to add a drug test requirement as prerequisites for processing a request for an access authorization (security clearance). Please check to ensure that all applicable contracts have been amended to include these updated requirements. Expect personnel security to return contractor requests for access authorizations that do not include the required information. A summary of the required information is attached.

  7. Voluntary Protection Program Onsite Review, Tank Farm Operations Contract -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    November 2010 | Department of Energy Tank Farm Operations Contract - November 2010 Voluntary Protection Program Onsite Review, Tank Farm Operations Contract - November 2010 November 2010 Evaluation to determine whether the Tank Farm Operations Contract is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during November 1 - 11, 2010 to determine whether Washington River Protection Solutions, LLC is continuing to perform at a level deserving

  8. Department of Energy to Compete Management and Operating Contracts for

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Three Office of Science Laboratories | Department of Energy to Compete Management and Operating Contracts for Three Office of Science Laboratories Department of Energy to Compete Management and Operating Contracts for Three Office of Science Laboratories November 17, 2006 - 9:25am Addthis WASHINGTON, DC -- The U.S. Department of Energy (DOE) announced today that it plans to begin competing the management and operating (M&O) contracts for three of its Office of Science national

  9. DOE Extends Contract to Operate Depleted Uranium Hexafluoride Conversion

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plants | Department of Energy Contract to Operate Depleted Uranium Hexafluoride Conversion Plants DOE Extends Contract to Operate Depleted Uranium Hexafluoride Conversion Plants December 24, 2015 - 10:00am Addthis Media Contact Brad Mitzelfelt, 859-219-4035 brad.mitzelfelt@lex.doe.gov LEXINGTON, Ky. - The U.S. Department of Energy's Office of Environmental Management (EM) today announced it is extending its contract for Operations of Depleted Uranium Hexafluoride (DUF6) Conversion Facilities

  10. NNSA Awards Nevada National Security Site Management & Operating Contract

    National Nuclear Security Administration (NNSA)

    to NVS3T | National Nuclear Security Administration | (NNSA) Awards Nevada National Security Site Management & Operating Contract to NVS3T August 26, 2016 Contract Award Provides Best Value to the Government and Workforce Stability for a Decade WASHINGTON, D.C. - The National Nuclear Security Administration (NNSA) announced today it has awarded Nevada Site Science Support and Technologies Corporation, LLC (NVS3T) with the management and operating contract for the Nevada National Security

  11. Dear Sir/Madam:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    June 3, 2016 Dear Sir/Madam: The Lake Erie Connector Project Draft Environmental Assessment (draft EA) (DOE/EA-2019) prepared by the Department of Energy (DOE) pursuant to the National Environmental Policy Act of 1969 (NEPA) and its implementing regulations is available for your review and comment. The U.S. Army Corps of Engineers (USACE)-Pittsburgh District is a cooperating agency in preparing the Lake Erie Connector Project draft EA. The proposed DOE action in the draft EA is to issue a

  12. Dear Mayor Riley: I

    Office of Legacy Management (LM)

    ~. Washington, DC 20585 ' . . aaAq 3 .A , Tbs %z;y;bl& &r& Ri!ey !llll Brookshire Avenue Downey, California 90247 ' Dear Mayor Riley: I Secretary of.Energy Hazel O!.Leary has announced a new approach, to openness in the Department of Energy (DOE) and its communications with the pubTic. In support of this initiative, we are pleased to forward the enclosed 'info'rmation related to:the former North American Aviation site in your jurisdiction that performed work for DOE or its

  13. Dear Mr. Dunr:

    Office of Legacy Management (LM)

    Dear Mr. Dunr: responded to &as L I am in a recci t of our correspondence dated 22 July 1992, truments in which you (TI) request for remediatton funding at a formerly utilixedburialsita at our Attleboro; Massachusetts facility. Though your letter discussed FUSRAP' s (Formerly Utilized Sites Re~@;q;r Action Program) protccol as determined by the De rtment of Ene failed to addres? potdial mechanisms for funding w le. Materials& ri F ontrola 1;:. Fi$tflI) was rnvolved with the U.S.

  14. DearMayor Kimble:

    Office of Legacy Management (LM)

    .' Department of Energy Washington; ' DC 20585 r FEBiO 1995' The Honorable Fred Kimble '. * '. -161 S. Cherry Street in Galesburg, Ill<inois. 61401, DearMayor Kimble: ,', .-. ; .,-.: " I' Secretary of Energy .Hazel O'Leary has announced a,new,approach toopenness in the Department of ,Energy (DOE) and its cotmnunications~with the.public.. In support of this initiative, we are pleased to,forward the.enc1ose.d information related to the former Midwest.Manufacturing Co. site in your

  15. DOE Awards Management and Operating Contract for DOE's Strategic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Petroleum Reserve | Department of Energy Management and Operating Contract for DOE's Strategic Petroleum Reserve DOE Awards Management and Operating Contract for DOE's Strategic Petroleum Reserve September 18, 2013 - 5:11pm Addthis WASHINGON, D. C. - After conducting a rigorous competitive selection process, the U.S. Department of Energy (DOE) today announced that Fluor Federal Petroleum Operations, LLC (team includes members comprised of Parent Company Fluor Federal Services, Inc., of

  16. Department of Energy Acquisition Regulation (DEAR) Technical...

    Broader source: Energy.gov (indexed) [DOE]

    of Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule (172.78 KB) More Documents & Publications Department of Energy Acquisition Regulation (DEAR) Technical ...

  17. Labor Standards for DOE Management and Operating Contracts

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Flash is issued to provide you an Acquisition Letter containing information and guidance regarding application of labor standards at the Department of Energy (DOE) and National Nuclear Security Administration (NNSA) management and operating (M&O) contract facilities.

  18. Acquisition Planning--Extending A Management and Operating Contract Without

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Full and Open Competition; and Site and Utilization Management Planning | Department of Energy Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning PF2009-13.pdf (337.25 KB) PF2009-13a - Acquisition Letter 2009-03 - Acquisition Planning (130.37 KB) More Documents

  19. ACQUISITION LETTER DEAR Part 933

    Broader source: Energy.gov [DOE]

    This Acquisition Letter (AL) is issued by the Procurement Executive pursuant to a delegation from the Secretary and under the authority of the Department of Energy Acquisition Regulation (DEAR) subsection 901.301-70.

  20. USA RS Basic Contract - Contract No.: DE-RW0000005 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    USA RS Basic Contract - Contract No.: DE-RW0000005 USA RS Basic Contract - Contract No.: DE-RW0000005 This document describes the Statement of Work (SOW) of the Management and Operating Contractor (M&O) Contract for the U.S. Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) Program's Yucca Mountain Project (YMP). An M&O contract is defined at Federal Acquisition Regulation (FAR) 17.6 and Department of Energy Acquisition Regulation (DEAR) 970. Inasmuch as

  1. DOE Awards Management and Operating Contract for DOE's Waste Isolation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pilot Plant | Department of Energy Management and Operating Contract for DOE's Waste Isolation Pilot Plant DOE Awards Management and Operating Contract for DOE's Waste Isolation Pilot Plant April 20, 2012 - 12:00pm Addthis Media Contacts Bill Taylor Environmental Management Consolidated Business Center (803) 952-8564 Deb Gill U.S. DOE Carlsbad Field Office (575) 234-7270 CARLSBAD, N.M. - The U.S. Department of Energy (DOE) announced today that Nuclear Waste Partnership LLC (members comprised

  2. Policy Flash 2014-10 Class Deviation DEAR 952.204-02 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DEAR 952.204-02 Questions concerning this policy flash should be directed to Lawrence Butler, of the Contract and Financial Assistance Policy Division at (202) 287-1945 or at...

  3. Dear Pantex Stakeholder,

    National Nuclear Security Administration (NNSA)

    ASSESSMENT FOR THE HIGH EXPLOSIVE SCIENCE & ENGINEERING FACILITY The Department of ... operate, and maintain a High Explosive Science & Engineering Facility (HE S&E) on Pantex ...

  4. Department of Energy Acquisition Regulation (DEAR) Technical

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Amendment-Final Rule | Department of Energy Technical Amendment-Final Rule Department of Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule PF2009-66.pdf (171.29 KB) PF2009-66a - Attachment-Department of Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule (172.78 KB) More Documents & Publications Department of Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters

  5. Dear Pantex Stakeholder,

    National Nuclear Security Administration (NNSA)

    PRODUCTION OFFICE INVITES COMMENTS ON DRAFT ENVIRONMENTAL ASSESSMENT FOR THE HIGH EXPLOSIVE SCIENCE & ENGINEERING FACILITY The Department of Energy/National Nuclear Security Administration Production Office (DOE/NPO) proposes to design, construct, operate, and maintain a High Explosive Science & Engineering Facility (HE S&E) on Pantex federal property using federal funding. The HE S&E facility would provide a modernized capability-based infrastructure at the Pantex Plant needed

  6. Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts

    Broader source: Energy.gov [DOE]

    Attached is Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts

  7. Dear Mr. Flack and Kolevar:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4, 2006 Dear Mr. Flack and Kolevar: We are pleased to submit the enclosed report The Relationship between Competitive Power Markets and Grid Reliability. This report was prepared in response to a recommendation of the U.S.-Canada Power System Outage Task Force (the Task Force). The Task Force concluded from its investigation of the August 13, 2003, blackout that restructuring of the bulk power industry was not a cause of the blackout. However, the Task Force did determine that it was appropriate

  8. Performance-based Contracting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance-based Contracting Reference: FAR 37.6; DEAR 970.1001 Overview This section provides guidance and instruction for the development and administration of Performance-Bas...

  9. Department of Energy Awards Contract for Management and Operation...

    Broader source: Energy.gov (indexed) [DOE]

    The U.S. Department of Energy (DOE) has awarded a new 2.5 billion, five-year contract for ... Under the new contract, UChicago Argonne is also joined by industrial partners, Jacobs ...

  10. Department of Energy Acquisition Regulation (DEAR) Final Rule...

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, ... More Documents & Publications Department of Energy Acquisition Regulation (DEAR) Technical ...

  11. Department of Energy Acquisition Regulation (DEAR) Final Rule...

    Broader source: Energy.gov (indexed) [DOE]

    Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, and C ... Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, ...

  12. Department of Energy Acquisition Regulation (DEAR) Subpart 903...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Acquisition Regulation (DEAR) Subpart 903.9: Whistleblower Protections for Contractor Employees Department of Energy Acquisition Regulation (DEAR) Subpart ...

  13. Tank Operations Contract Section J Contract No. DE-AC27-08RV14800...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Hanford Site contractors and their subcontractors. Conduct or support emergency ... PRC TOC WTP RCCC Other Contracts 91 Occupational Medicine Service Service Fee for Service ...

  14. Energy Department Awards New Contract to Manage and Operate Brookhaven National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy (DOE) has awarded a new five-year, $3.2 billion contract to Brookhaven Science Associates (BSA) to manage and operate Brookhaven National Laboratory. The award was the result of a DOE competition for the management and operations (M&O) contract for the laboratory, which has been operated by BSA for the Department since 1998.

  15. How to Determine and Verify Operating and Maintenance Savings in Federal Energy Savings Performance Contracts

    Broader source: Energy.gov [DOE]

    Document describes guidance on operations and maintenance (O&M) savings determination and verification within the energy savings performance contracts (ESPCs).

  16. Wallington, New Jersey 07057 Dear Mayor Wourgacki:.

    Office of Legacy Management (LM)

    : 24 Union Boulevard Wallington, New Jersey 07057 Dear Mayor Wourgacki:. 1 .' Secretary of Energy.Hazel O'Leary has announced a' new approach to openness in the Department ...

  17. Department of Energy Acquisition Regulation (DEAR)

    Office of Energy Efficiency and Renewable Energy (EERE)

    To ensure that you are using the most recent version of the Department of Energy Acquisition Regulation (DEAR), use one of the electronic versions at one of the following websites: DOE Procurement - http://management.energy.gov/DEAR.htm; Electronic Code of Federal Regulations - http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&tpl=/ecfrbrowse/Tit... or Hill Air Force Base - http://farsite.hill.af.mil/vfdoea.htm.

  18. National Security Campus Management and Operating (M&O) Contract

    National Nuclear Security Administration (NNSA)

    Competition | National Nuclear Security Administration | (NNSA) Solicitation National Security Campus Management and Operating (M&O) Contract Competition Contract Competition Home Page Welcome to the National Nuclear Security Administration's website for the National Security Campus (NSC) Management and Operating Contract Competition. The NSC in Kansas City, MO, is situated on approximately 177 acres. The facility is leased for the NNSA by the General Services Administration. Satellite

  19. Consent to Subcontracts on Management and Operating (M&O) Contracts

    Broader source: Energy.gov [DOE]

    This is to provide notice that an Acquisition Letter (AL) will be issued addressing the establishment of subcontract review thresholds on M&O contracts. Currently, DEAR 970.4401-1 and 970.4401-2 require Heads of the Contracting Activities (HCAs) to establish thresholds, by subcontract type and dollar level, for the review and approval of proposed subcontracting actions by each M&O contractor under their cognizance. The AL will seek to improve Consent to Subcontract efficiency and to ensure we apply our resources to those subcontract actions that truly pose the most risk. The AL will state that the HCA should determine appropriate tiers for subcontract review thresholds, as a result of a risk assessment. This tiered approach may result in different thresholds being established for different sites as well as different thresholds at a given site, taking into consideration the best interests of DOE and the following factors: approval status of the contractor's purchasing system results of Independent Peer Review Program for Contractors' Purchasing Systems (e.g., PERT results) results of Contractor Balanced Scorecard Self-assessment size, experience, ability, reliability, and organization of the contractor's purchasing function internal controls, procedures, and organizational stature of the contractor's purchasing function subcontract type (fixed price vs. cost reimbursement) degree of competition value nature of the work/complexity whether the subcontract needs special surveillance

  20. Chapter 52.1, Local Contract Clauses

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2.1, Local Contract Clauses Reference: FAR 52, DEAR 952 Overview This section addresses ... Background A local clause is a solicitation provision or contract clause that is not ...

  1. DOE-SR Exercises Option on Management and Operating Contract | Department

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Energy DOE-SR Exercises Option on Management and Operating Contract DOE-SR Exercises Option on Management and Operating Contract August 4, 2016 - 12:00pm Addthis Media Contact: Jim Giusti, DOE-SR, (803) 952-8283 james-r.giusti@srs.gov The Department of Energy (DOE), Savannah River Operations Office, will exercise an option to extend the term of the current management and operating contract with Savannah River Nuclear Solutions (SRNS) for an additional 22 months, from Oct. 1, 2016 to July

  2. Chapter 70 - DOE Management and Operating Contracts | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    icon 70.7ch3ContractorHumanResourceManagement1.pdf ...h6PatentandDataRights1.pdf PDF icon 70.7ch7FinancialManagement1.pdf PDF icon 70.7ch8BusinessandContractMan...

  3. DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WIPP | Department of Energy Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP January 18, 2005 - 9:55am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) announced today that it has decided to exercise the five year option in the Washington TRU Solutions LLC ("WTS") contract to continue managing and operating the Department's Waste Isolation Pilot Plant (WIPP),

  4. Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts

    Office of Energy Efficiency and Renewable Energy (EERE)

    The attached Acquisition Letter is issued to provide updated guidance on the unique acquisition planning procedures associated with management and operating (M%26O) contracts. Acquisition Letter 2009-3 is cancelled.

  5. NNSA Announces Plans to Extend BWXT Y-12 Contract for Operation of the Y-12

    National Nuclear Security Administration (NNSA)

    National Security Complex | National Nuclear Security Administration | (NNSA) Plans to Extend BWXT Y-12 Contract for Operation of the Y-12 National Security Complex June 02, 2005 PDF icon NR04-05.pdf

  6. Department of Energy to Compete Management & Operating Contract for its National Renewable Energy Laboratory

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that it will compete the management and operating (M&O) contract for its National Renewable Energy Laboratory (NREL) in...

  7. DOE to Compete Contract for Management and Operation of Pacific Northwest National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, D.C. -- The U.S. Department of Energy (DOE) announced today that it intends to seek competitive bids for the management and operations contract for the Pacific Northwest National...

  8. U.S. Department of Energy to Extend Pacific Northwest National Laboratory Management and Operating Contract

    Office of Energy Efficiency and Renewable Energy (EERE)

    Washington, DC - Secretary of Energy Samuel W. Bodman today announced his decision to authorize a four-year contract extension for the management and operation of the U.S. Department of Energy's ...

  9. Department of Energy to Compete Management and Operating Contracts for Three Office of Science Laboratories

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC -- The U.S. Department of Energy (DOE) announced today that it plans to begin competing the management and operating (M&O) contracts for three of its Office of Science national...

  10. Management & Operating (M&O) Contracts | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management & Operating (M&O) Contracts Laboratory Policy (LP) LP Home About Laboratory Appraisal Process Laboratory Planning Process Laboratory Directed Research and Development (LDRD) Management & Operating (M&O) Contracts Technology Transfer Strategic Partnership Projects (SPP) Contact Information Laboratory Policy U.S. Department of Energy SC-32/Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5447 F: (202) 586-3119 More Information » Management

  11. DOE Awards Management and Operating Contract for DOE's Strategic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Arlington, Virginia and major subcontractors MRIGlobal of Kansas City, Missouri; Booz Allen Hamilton of Mclean, Virginia; and ASRC Petroleum Operations and Maintenance of ...

  12. Department of Energy to Compete Management and Operating Contracts...

    Broader source: Energy.gov (indexed) [DOE]

    Associates, Long Island, NY; Princeton Plasma Physics Laboratory (PPPL) operated by ... (PET) Facility, and others. Princeton Plasma Physics Laboratory is a collaborative ...

  13. DOE Orders/Standards and Applicable CFRs/DEAR Crosswalk

    Office of Environmental Management (EM)

    21102 1 DOE OrdersStandards and Applicable CFRsDEAR Crosswalk DOE Order Title Date Corresponding Standards Corresponding CFRsDEAR Clauses DOE O 3790.1B Federal Employee ...

  14. Technical Standards, DOE Orders and Applicable CFRs/DEAR Crosswalk -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    February 2, 2002 | Department of Energy DOE Orders and Applicable CFRs/DEAR Crosswalk - February 2, 2002 Technical Standards, DOE Orders and Applicable CFRs/DEAR Crosswalk - February 2, 2002 February 2, 2002 DOE Orders/Standards and Applicable CFRs/DEAR Crosswalk List Technical Standards, DOE Orders and Applicable CFRs/DEAR Crosswalk (35.5 KB) More Documents & Publications Technical Standards,DOE Standards and Corresponding Directives Crosswalk - February 2, 2002 Technical Standards,

  15. Dear Mr. Flack and Kolevar:

    Office of Environmental Management (EM)

    ... In simple terms, this arrangement is like having a coal-fired power generation plant operating next to the coal mine that provides a dedicated, continuous supply of fuel for the ...

  16. Energy San Francisco Operations Office

    Office of Legacy Management (LM)

    Depariment of ' Energy San Francisco Operations Office 1333 Broadway Oakland, California 94612 FEB 6 1984 Mr. c:c. canners Energy Systems Group Rockwell International Corporation Post Office BOX 309 Canoga Park Dear 8 a CA 91304 G ers : Remedial action was taken to decontaminate the Hot Cave (Building 003) and Sodium Reactor Experiment (SRE) under Contract No. DE-AT03-76SF75008. The report of the post remedial survey, performed by Argonne National Laboratory, indicates that the levels of

  17. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Richland Operations Office P.O. Box 550 &?ATES0~Richland, Washington 99352 10O-AMSE-0054 A PR I~ ~~ Mr. J. G. Lehew III, President and Chief Executive Officer CH2M HILL Plateau Remediation Company Richland, Washington 99352 Dear Mr. Lehew: CONTRACT NO. DE-AC06-08RL14788 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HASQARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Attachment J.2, List B:

  18. Management and Operating (M&O) Contracts | U.S. DOE Office of Science (SC)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management and Operating (M&O) Contracts Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Kenneth Tarcza U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-4444 Acquisition and Assistance Management and Operating (M&O) Contracts Print Text Size: A

  19. Reissuance of Acquisition Letter on Meal Costs in Management and Operation Contracts

    Office of Energy Efficiency and Renewable Energy (EERE)

    This AL is a reissuance (under the new AL number of 2012-05) of the AL on Meal Costs in Management and Operating Contracts that was originally issued on August 2, 2005 (under AL number 2005-12). It provides additional application guidance on: understanding the standards for reimbursement of contractor meal costs

  20. Department of Energy Acquisition Regulation (DEAR) Subpart 903.9:

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Whistleblower Protections for Contractor Employees | Department of Energy Department of Energy Acquisition Regulation (DEAR) Subpart 903.9: Whistleblower Protections for Contractor Employees Department of Energy Acquisition Regulation (DEAR) Subpart 903.9: Whistleblower Protections for Contractor Employees Stakeholders: DOE Contractor employees Scope: This subpart of DEAR implements the DOE Contractor Employee Protection Program as set forth at 10 CFR part 708. This establishes the criteria

  1. Department of Energy Acquisition Regulation (DEAR) Final Rule for changes

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Parts 908, 945, 952, and 970 regarding Government Property | Department of Energy Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property was published

  2. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 7/14/14) Appendix SFA-1 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at the following website addresses: * FAR: http://farsite.hill.af.mil/vffara.htm and * DEAR:

  3. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 7/14/14) Appendix SFA-1 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at the following website addresses: * FAR: http://farsite.hill.af.mil/vffara.htm and * DEAR:

  4. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 7/14/14) Appendix SFA-1 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at the following website addresses: * FAR: http://farsite.hill.af.mil/vffara.htm and * DEAR:

  5. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 7/14/14) Appendix SFA-1 Page 1 of 5 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website addresses: FAR: http://farsite.hill.af.mil/vffara.htm DEAR:

  6. U.S. Department of Energy Awards Contract for Management and Operation of

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fermi National Accelerator Laboratory to the Fermi Research Alliance, LLC | U.S. DOE Office of Science (SC) U.S. Department of Energy Awards Contract for Management and Operation of Fermi National Accelerator Laboratory to the Fermi Research Alliance, LLC News News Home Featured Articles Science Headlines 2016 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 Science Highlights Presentations & Testimony News Archives Communications and Public Affairs Contact Information Office of

  7. Class Deviation from the Department of Energy Acquisition Regulation (DEAR) 952.204-2, Security Requirements

    Office of Energy Efficiency and Renewable Energy (EERE)

    A class deviation from DEAR 952.204-2, Security Requirements, has been issued. The DEAR will be amended to reflect this change in an upcoming rulemaking.

  8. Request for Proposal No. DE-SOL-0007749 PART II - CONTRACT CLAUSES

    National Nuclear Security Administration (NNSA)

    PART II - CONTRACT CLAUSES SECTION I CONTRACT CLAUSES TABLE OF CONTENTS A. FAR CLAUSES INCORPORATED BY REFERENCE ..................................................................................... 1 B. DEAR CLAUSES INCORPORATED BY REFERENCE .................................................................................. 5 C. FAR AND DEAR CLAUSES INCORPORATED IN FULL TEXT .................................................................. 7 I-1 FAR 52.202-1 DEFINITIONS (NOV 2013) (AS MODIFIED

  9. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    .1, 6/17/13) Appendix SFA-1 Page 1 of 6 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website address: http://www.acquisition.gov/far/ or http://www.management.energy.gov/DEAR.htm (c) The

  10. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    .1, 6/17/13) Appendix SFA-1 Page 1 of 6 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website address: http://www.acquisition.gov/far/ or http://www.management.energy.gov/DEAR.htm (c) The

  11. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, 3/11/13) Appendix SFA-1 Page 1 of 9 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website address: http://www.acquisition.gov/far/ or http://www.management.energy.gov/DEAR.htm (c) The

  12. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SFA (Rev. 2, 3/11/13) Appendix SFA-1 Page 1 of 8 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website address: http://www.acquisition.gov/far/ or http://www.management.energy.gov/DEAR.htm

  13. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 3/11/13) Appendix SFA-1 Page 1 of 3 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website address: http://www.acquisition.gov/far/ or http://www.management.energy.gov/DEAR.htm (c) The

  14. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, 3/11/13) Appendix SFA-1 Page 1 of 8 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website address: http://www.acquisition.gov/far/ or http://www.management.energy.gov/DEAR.htm (c) The

  15. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 3/11/13) Page 1 of 6 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website address: http://www.acquisition.gov/far/ or http://www.management.energy.gov/DEAR.htm (c) The following

  16. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 3/11/13) Appendix SFA-1 Page 1 of 6 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website address: http://www.acquisition.gov/far/ or http://www.management.energy.gov/DEAR.htm (c) The

  17. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 7/14/14) Appendix SFA-1 Page 1 of 7 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website address: FAR: http://farsite.hill.af.mil/vffara.htm DEAR: http://farsite.hill.af.mil/vfdoea.htm

  18. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 7/14/14) Appendix SFA-1 Page 1 of 8 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website address: FAR: http://farsite.hill.af.mil/vffara.htm DEAR: http://farsite.hill.af.mil/vfdoea.htm

  19. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 7/14/14) Appendix SFA-1 Page 1 of 8 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website address: FAR: http://farsite.hill.af.mil/vffara.htm DEAR: http://farsite.hill.af.mil/vfdoea.htm

  20. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2, 7/14/14) Appendix SFA-1 Page 1 of 3 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website address: FAR: http://farsite.hill.af.mil/vffara.htm DEAR: http://farsite.hill.af.mil/vfdoea.htm

  1. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    , 7/14/14) Appendix SFA-1 Page 1 of 8 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website address: FAR: http://farsite.hill.af.mil/vffara.htm DEAR: http://farsite.hill.af.mil/vfdoea.htm

  2. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ATESORichland, Washington 99352 16-PRO-0061 DEC 17 2015 Ms. H. P. Mooers, President HPM Corporation 4304 West 2 4 th Aye, Suite 100 Kennewick, Washington 99338 Dear Ms. Mooers: CONTRACT NO. DE-EM0002043 - HPM CORPORATION (HPMC) FISCAL YEAR 2015 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) FEE DETERMINATION The U.S. Department of Energy Richland Operation Office (RL) has completed its evaluation of I-PMC's performance for the period of October 1, 2014, through September 30, 2015. As the Fee

  3. Contract No. DE-AC02-07CH11358

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... the Department of Energy Acquisition Regulation (DEAR) in effect at the time the fee is ... accordance with the Federal Acquisition Regulation (FAR) Part 35 and operated under this ...

  4. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... electrical conductors in accordance with NFPA 70E. Further, it was apparent based upon ... Company Richland, Washington 99352 Dear Mr. Lehew: CONTRACT NO. DE-AC06-08RL14788 - ...

  5. U.S. Department of Energy Awards Contract for Management and Operation of Ames Laboratory to Iowa State University

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) has awarded a new $150 million, five-year contract for management and operation of Ames Laboratory to Iowa State University (ISU).

  6. Department of Energy Awards Contract for Management and Operation of Argonne National Laboratory to the University of Chicago Argonne, LLC

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, DC - The U.S. Department of Energy (DOE) has awarded a new $2.5 billion, five-year contract for management and operation of Argonne National Laboratory (ANL) to the UChicago Argonne,...

  7. Energy Department Awards Contract to the University of California to Manage and Operate Lawrence Berkeley National Laboratory

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC -- The Department of Energy (DOE) has awarded a new five-year contract to the University of California to manage and operate its Lawrence Berkeley National Laboratory (LBNL).  The...

  8. Newark, New Jersey ,07102 DearMayor Sharpe:

    Office of Legacy Management (LM)

    The Honorable,,JamesSharpe 920 Broad' Street Newark, New Jersey ,07102 : DearMayor Sharpe: ., Secretary of Energy Hazel O'Leary-has:announced a new.approach to openn Secretary of ...

  9. Union City, New Jersey 07087 Dear Mayor Walter:

    Office of Legacy Management (LM)

    3715 Paisade Avenue - .*<;1 Union City, New Jersey 07087 Dear Mayor Walter: Secretary of Energy Hazel O'Leary has announced a new approach to openness in the Department of ...

  10. Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3, 3/11/13) Construction Subcontract Appendix SFA-1 Page 1 of 8 Appendix SFA-1 FAR & DEAR Clauses Incorporated By Reference (a) The Federal Acquisition Regulation (FAR) and the Department of Energy Acquisition Regulation (DEAR) clauses which are incorporated by reference herein shall have the same force and effect as if printed in full text. (b) Full text of the referenced clauses may be accessed electronically at website address: http://www.acquisition.gov/far/ or

  11. Class Deviation addressing Buy American Act requirements in Department of Energy Acquisition Regulation (DEAR) 970.5244-1, Contractor Purchasing System

    Office of Energy Efficiency and Renewable Energy (EERE)

    The attached class deviation from DEAR 970.5244-1(g) has been issued to increase the dollar threshold from $100,000 to $500,000 for: (1) determinations of individual item non-availability requiring the prior concurrence of the Head of the Contracting Activity (HCA)

  12. TO: Procurement Directors/Contracting Officers FROM: Director

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 DATE: January 28, 2013 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property SUMMARY: Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property was

  13. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    SciTech Connect (OSTI)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

  14. Management and Operating (M&O) Contracts | U.S. DOE Office of...

    Office of Science (SC) Website

    DE-AC05-00OR22725 External link Pacific Northwest National Laboratory - Contract No. DE-AC05-76RL01830 External link Princeton Plasma Physics Laboratory - Contract No. ...

  15. Current Contracts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Current Contracts U.S. Department of Energy Carlsbad Field Office Management & Operating Contractor for the Waste Isolation Pilot Plant Contract Number DE-EM0001971 Fee Payment Information (Nuclear Waste Partnership, LLC.) U.S. Department of Energy Carlsbad Field Office Transportation Contractors for the Waste Isolation Pilot Plant Contract Number DE-EM0001840 (Visionary Solutions, LLC) Contract Number DE-EM0001819 (CAST Specialty Transportation Services, Inc.) U.S. Department of Energy

  16. Public Utilities Specialist (Contracts- Senior Contract Administrator)

    Broader source: Energy.gov [DOE]

    This position is located in the Contract Administration group of the Contract Management and Administration (KSC) organization, Customer Support Services (KS), Chief Operating Officer (K),...

  17. DOE Issues Request for Information for Richland Operations Office Richland Acquisitions – Post Fiscal Year 2018 Contract(s) Acquisition Planning

    Broader source: Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center today issued a Sources Sought/Request for Information (RFI) seeking interested parties with specialized capabilities necessary to successfully perform all or a portion of the elements of scope for a potential upcoming competitive Environmental Management (EM) procurement(s) for the environmental cleanup projects and Hanford Site infrastructure and services at the Richland Operations Office (RL), hereafter referred to as “Richland Acquisitions – Post Fiscal Year 2018 Contract(s)” and to further determine whether or not all or a portion of the work can be set-aside for small and disadvantaged businesses.

  18. Incorporation of the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts

    Office of Energy Efficiency and Renewable Energy (EERE)

    This subject guide chapter provides guidance for Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts.

  19. RE: FOIA SWPA-2016-00632-F Dear Mr.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RE: FOIA SWPA-2016-00632-F Dear Mr. Department of Energy Southwestem Power Administration One West Third Street Tulsa, .Oklahoma 74103-3502 April 11, 2016 This letter is in response to your Freedom of lnfonnation Act request received on March 14, 2016. You requested the following: 1) All documentation of any actions, SWPA has taken to protect Its generating capacity, transformers, substations and/or power lines against the effects of an Electromagnetic Pulse event (EMP) whether against natural

  20. Policy Flash 2013-40 Acquisition Guide Chapter 43.3 Maintaining Alignment of Project Management with Contract Management of Non-Management and Operating (M&O) Cost Reimburstment Contracts

    Broader source: Energy.gov [DOE]

    Attached is Policy Flash 2013-40 Acquisition Guide Chapter 43.3 Maintaining Alignment of Project Management with Contract Management of Non-Management and Operating (M&O) Cost Reimbursement...

  1. Class Deviation- DEAR 950.7006 /AL 2012-10, Implementation of the Price-Anderson Amendments Act of 2005

    Office of Energy Efficiency and Renewable Energy (EERE)

    A class deviation from DEAR 950.7006, Statutory nuclear hazards indemnity agreement, has been issued pending formal amendment of the DEAR Clause 952.250-70, Nuclear Hazards Indemnity Agreement. Acquisition Letter 2005-15 includes an alternative model clause for use in place of DEAR clause 952.250-70 until the dear amended.

  2. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    SciTech Connect (OSTI)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  3. Cost Participation in Research and Development Contracting

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    35.2 June 2016 ______________________________________________________________________________ 1 Cost Participation in Research and Development Contracting [References: Public Law 109-58, Energy Policy Act of 2005, FAR 35.003(b), DEAR 917.70] 1.0 Summary of Latest Changes This update: (1) combines Acquisition Guide Chapters 17.2, Cost Participation, and 35.2, Cost Sharing in Research and Development Contracting, (2) updates delegations of authority, (3) updates sample cost sharing language for

  4. Tank Operations Contract No. DE-AC27-08R Vi4800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    R Vi4800 Modification No. 077 Page 2 of 2 Continuation Page, SF30 Block 14 Purpose of Modification: This Unilateral Change Order modifies the Change Order issued under contract modification 069, by finalizing the draft version of the Corrective Action Plan (CAP), which was recently approved by the Department of Energy Headquarters with no changes. This modification also adds interim action item number 7, which provides guidance on the submission of weekly progress reports to ORP. The Not to

  5. U.S. Department of Energy Awards a Contract to USA Repository Services for Management and Operating Contractor Support for the Yucca Mountain Project

    Broader source: Energy.gov [DOE]

    Washington, D.C. -- The U.S. Department of Energy (DOE) today awarded a $2.5 billion management and operating (M&O) contract to USA Repository Services (USA-RS), a wholly-owned subsidiary of...

  6. U.S. Department of Energy Awards Contract for Management and Operation of Fermi National Accelerator Laboratory to the Fermi Research Alliance, LLC

    Broader source: Energy.gov [DOE]

    BATAVIA, ILLINOIS -- The U.S. Department of Energy (DOE) has awarded a new $1.575 billion, five-year contract for management and operation of Fermi National Accelerator Laboratory (FNAL) to the...

  7. Contract No. DE-AC27-OI RVI 4136

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OI RVI 4136 Modification No. 235 SF-30 Continuation Purpose of Modification: The purpose of this modification is to implement Department of Energy (DOE) Order (0) 200. 1, Departmen70t of Energy Privac Pro0graCm, into Section J, List of'Attachl?7ents, Attachmnent E, List of Applicable Directives (List B-DEAR 970.5204. 78), of the contract. This Order is implemented at no additional cost to the Government. Description of Modification: 1. Under the Authority of Contract Clause 1. 117, DEAR

  8. Part 2, Clauses Prescribed in DEAR Parts 952 and 970 | Department of Energy

    Office of Environmental Management (EM)

    Part 2, Clauses Prescribed in DEAR Parts 952 and 970 Part 2, Clauses Prescribed in DEAR Parts 952 and 970 M_O_ClauseMatrix.pdf (79.79 KB) More Documents & Publications Microsoft Word - Matrixpart2.doc AcqGuide70.52Matrixpart2Redo-OPAM Microsoft Word - AcqGuide70pt52Matrixpart2Redo

  9. Major Contracts Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contracts Summary Major Contracts Summary Major Contracts Summary (266.34 KB) More Documents & Publications LANS Bridge Contract DOE NNSA Site Facility Management Contracts - June 2016 RFP: Management and Operation of the National Renewable Energy Laboratory

  10. DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Capture Processes | Department of Energy DOE Establishes National Carbon Capture Center to Speed Deployment of CO2 Capture Processes DOE Establishes National Carbon Capture Center to Speed Deployment of CO2 Capture Processes May 27, 2009 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy has announced the creation of a new National Carbon Capture Center (NCCC) to develop and test technologies to capture carbon dioxide (CO2) from coal-based power plants. Managed and operated by

  11. Environmental Program Services Contract | National Nuclear Security...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Management Environmental Program Services Contract Environmental Program Services Contract ... Related News NNSA Awards Nevada National Security Site Management & Operating Contract to ...

  12. Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484

    SciTech Connect (OSTI)

    Simiele, Connie J.; Blackford, L. Ty; West, Lori D.

    2013-07-01

    Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource

  13. Memorandum to Procurement Directors about Class Deviation DEAR 970.5232-3

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Accounts, Records, and Inspections | Department of Energy Memorandum to Procurement Directors about Class Deviation DEAR 970.5232-3 Accounts, Records, and Inspections Memorandum to Procurement Directors about Class Deviation DEAR 970.5232-3 Accounts, Records, and Inspections PF2009-51.pdf (881.69 KB) PF2009-51a - Attachment 1-Acquisition Letter No. AL 2009-09: Class Deviation DEAR 970.5232-3 Accounts, Records, and Inspections (28.6 KB) PF2009-51b - Attachment 2 - DOE and NNSA Determination

  14. Contract | Argonne National Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Argonne's Prime Contract is the contract between the U.S. Department of Energy and UChicago Argonne, LLC that sets out the terms and conditions for the operation of Argonne National Laboratory. Please direct general comments and questions about the Argonne Prime Contract to William Luck. Navigation Tips Listed below are tips on navigating through the Argonne Prime Contract. The navigation menu contains the currently available options. Select the main Argonne Prime Contract at any time to return

  15. Total Estimated Contract Cost: Contract Option Period: Maximum...

    Office of Environmental Management (EM)

    LLC Contract Number: DE-AC30-11CC40015 Contract Type: Cost Plus Award Fee EM Contractor Fee December 2015 Site: Portsmouth Paducah Project Office Contract Name: Operation of DUF6

  16. Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, and C

    Office of Energy Efficiency and Renewable Energy (EERE)

    Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, and C was published February 11, 2011, in the Federal Register 76 FR 7685. The changes are effective March 14, 2011.

  17. GE partners with Matthew Dear to create "Drop Science" | GE Global...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    emissions from the world's most powerful machines. The result is an original track of music titled "Drop Science." Listen to the track here: Watc Matthew Dear and Andrew Gorton...

  18. Microsoft Word - KCP SEC I_Contract Clauses

    National Nuclear Security Administration (NNSA)

    I, Page i PART II - CONTRACT CLAUSES SECTION I CONTRACT CLAUSES TABLE OF CONTENTS I-1 FAR 52.202-1 DEFINITIONS (JUL 2004) (AS MODIFIED BY DEAR 952.202-1) ................................ 1 I-2 FAR 52.203-3 GRATUITIES (APR 1984) ................................................................................................... 1 I-3 FAR 52.203-5 COVENANT AGAINST CONTINGENT FEES (APR 1984) ........................................... 2 I-4 FAR 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE

  19. River Corridor Closure Contract Section J, Attachment J-6

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 Contract No. DE-AC06-05RL14655 Mod 459 1 ATTACHMENT J-6 ADVANCE AGREEMENT, PERSONNEL, AND RELATED COSTS This attachment will be prepared subsequent to Contract award pursuant to Clause H.15, Advance Understanding on Costs. The advance understandings listed below are subject to the specific limitations, conditions, and exclusions of subpart 31.2 of FAR as supplemented by Department of Energy Acquisition Regulation (DEAR) 931.2. TYPE OF COST ALLOWABILITY CLARIFICATION Beryllium Testing/Travel

  20. Tank Operations Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    as contaminated areas are identified; * Down-Posting of Cleared Facilities as clearance can be demonstrated; * Communication of Survey Results; o Generalized Employee ...

  1. MAJOR SITE CONTRACTS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NON-NNSA MANAGEMENT and OPERATING and MAJOR SITE CONTRACTS # DOE OFFICE HEAD OF CONTRACTING ACTIVITY PROCUREMENT DIRECTORS SENIOR DOE SITE PROCUREMENT MANAGERS M&O CONTRACT MAJOR SITE & FACILITIES CONTRACT CONTRACTOR NAME 1 Chicago Office (Ames Site Office) Jennifer A. Stricker Ames National Laboratory Iowa State University 2 Chicago Office (Argonne Site Office) Sergio E. Martinez Argonne National Laboratory University of Chicago Argonne, LLC 3 Chicago Office (Berkeley Site Office)

  2. Prime Contract

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Prime Contract Prime Contract Provides a list of fees earned by LANS and posted on the prime contract. Contact Jeanette Y. Bennion Ethics & Audit (505) 665-3014 Andrea ...

  3. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Broader source: Energy.gov (indexed) [DOE]

    Cumulative Fee 570,363,260 394,157,083 EM Contractor Fee Savannah River Site Office, Aiken, SC Management & Operating Contract June 2015 DE-AC09-08SR22470 Cost Plus Award Fee...

  4. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Energy Savers [EERE]

    Option 2: 10116 to 73118 EM Contractor Fee Savannah River Site Office, Aiken, SC Management & Operating Contract September 2015 DE-AC09-08SR22470 Cost Plus Award Fee...

  5. Contract No

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Section J Appendix J J-J-1 ATTACHMENT J.10 APPENDIX J TREATIES AND INTERNATIONAL AGREEMENTS/WAIVED INVENTIONS Applicable to the Operation of AMES Laboratory Contract No. DE-AC02-07CH11358 United States Department of Energy Agreement Listing J-J-2 Expiration Date DOE Office Title 1-6-97; exec 1-6-92 PO Agreement relating to scientific and technical cooperation between the Government of the United States of America and the Government of the Republic of Korea. 7-6-99; exec 7-6-94 IA and Department

  6. CONTRACT EMPLOYEES

    National Nuclear Security Administration (NNSA)

    Employee State Offices Contacts for Complaints of Discrimination CONTRACT EMPLOYEES: In ... Page 1 of 2, issued March 14, 2008. Contract Employee State Offices Contacts for ...

  7. Contract Acknowledgement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Acknowledgement These pages were developed under contract number DE-SC0014664 between Oak Ridge Associated Universities and the U.S. Department of Energy.

  8. INL Contract Modifications

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modifications to Contract No. DE-AC07-05ID14517 You are here: DOE-ID Home > Contracts, Financial Assistance & Solicitations > INL Contract > INL Basic Modifications Blue Line Free Acrobat Reader Link The documents listed below represent an electronic copy of modifications to the contract for the Management and Operation of the INL awarded to Battelle Energy Alliance, LLC. These documents are in PDF format. The Adobe Reader is required to access them. If you do not currently have the

  9. Mr. Jeff Dolven President and Chief Executive Officer Skookum Contract Services

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2, 2015 Mr. Jeff Dolven President and Chief Executive Officer Skookum Contract Services P.O. Box 5359 Bremerton, Washington 98312 WEL-2015-03 Dear Mr. Dolven: The Office of Enterprise Assessments' Office of Enforcement conducted an investigation into the partial finger amputation sustained by a Skookum Contract Services (Skookum) worker on December 4, 2014, during transformer demolition at the Office of Secure Transportation's Vehicle Maintenance Facility (VMF) in Oak Ridge, Tennessee. Based on

  10. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    S2ATES~*Richland, Washington 99352 CERTIFIED MAIL NOV Ii~ 2009 Mr. Marvin Kinney Port of Benton 3 100 George Washington Way Richland, Washington 99354 Dear Mr. Kinney: FREEDOM OF INFORMATION ACT REQUEST (FOI 20 10-00296) Pursuant to the Freedom of Information Act, you requested Contract AT-45-1I-GEN 21 between the Atomic Energy Commission and the Northern Pacific Railway Company dated December 7, 1948. We have conducted a thorough search and were unable to locate the contract. This search was

  11. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    t P.O. Box 550 ~4TES~Richland, Washington 99352 1 0-AMSE-0056 Anp 01 2019t Mr. F. A. Figueroa, President and General Manager Mission Support Alliance, LLC Richland, Washington 99352 Dear Mr. Figueroa: CONTRACT NO. DE-AC06-09RL 14728 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HASQARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Section J, Table J-2.9). The HASQARD contains the standards for site sampling and

  12. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ' 5 ~7AE d~Richland, Washington 99352 10-AMSE-0055 APR 0 9 2010 Mr. M. N. Brosee, President Washington Closure Hanford LLC Richland, Washington 99354 Dear Mr. Brosee: CONTRACT NO. DE-AC06-05RL14655 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HAS QARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Attachment J-2, List B: Applicable DOE Directives). The HASQARD contains the standards for site sampling and analytical

  13. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Number: Contract Type: Total Estimated Contract Cost: Contract Base Period: Contract Option Periods: Minimum Fee Maximum Fee Performance Period Fee Available Fee Earned FY2009/2010 $22,386,342 $19,332,431 FY2011 $26,164,766 $23,956,349 FY2012 $21,226,918 $19,099,251 FY2013 $21,030,647 $19,352,402 FY2014 $18,986,489 $16,518,626 FY2015 $21,043,816 $18,776,345 FY2016 $21,027,870 FY2017 Cumulative Fee $151,866,848 $117,035,404 $151,866,848 EM Contractor Fee Richland Operations Office - Richland, WA

  14. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Number: Contract Type: Total Estimated Contract Cost: Contract Base Period: Contract Option Period: Minimum Fee Target Fee Maximum Fee Performance Period Fee Available (N/A) Fee Earned (Equals 10% of Target) FY2005 $223,991 FY2006 $1,548,986 FY2007 $1,170,889 FY2008 $1,270,755 FY2009 $1,567,325 FY2010 $2,374,992 FY2011 $2,498,835 FY2012 $1,440,273 FY2013 $1,595,460 FY2014 $33,113,257 FY2015 $1,546,386 FY2016 $6,553,927 Cumulative Fee $54,905,075 N/A EM Contractor Fee Richland Operations Office -

  15. ATL Contract - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Office of River Protection ORP Contracts & Procurements Home DOE-ORP Contract Management Plans DOE-ORP Prime Contracts BNI Contract BNI Contract Modifications ATL Contract ATL Contract Modifications WRPS Contract WRPS Contract Modifications CH2M Contract CH2M Contract Modifications WAI Contract WAI Contract Mods DOE-ORP Contracting Officers DOE ORP Contracting Officer Representatives DOE ORP Purchase Card Buyers ATL Contract Email Email Page | Print Print Page | Text Increase Font

  16. BNI Contract - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Office of River Protection ORP Contracts & Procurements Home DOE-ORP Contract Management Plans DOE-ORP Prime Contracts BNI Contract BNI Contract Modifications ATL Contract ATL Contract Modifications WRPS Contract WRPS Contract Modifications CH2M Contract CH2M Contract Modifications WAI Contract WAI Contract Mods DOE-ORP Contracting Officers DOE ORP Contracting Officer Representatives DOE ORP Purchase Card Buyers BNI Contract Email Email Page | Print Print Page | Text Increase Font

  17. Dynamic-Feature Extraction, Attribution and Reconstruction (DEAR) Method for Power System Model Reduction

    SciTech Connect (OSTI)

    Wang, Shaobu; Lu, Shuai; Zhou, Ning; Lin, Guang; Elizondo, Marcelo A.; Pai, M. A.

    2014-09-04

    In interconnected power systems, dynamic model reduction can be applied on generators outside the area of interest to mitigate the computational cost with transient stability studies. This paper presents an approach of deriving the reduced dynamic model of the external area based on dynamic response measurements, which comprises of three steps, dynamic-feature extraction, attribution and reconstruction (DEAR). In the DEAR approach, a feature extraction technique, such as singular value decomposition (SVD), is applied to the measured generator dynamics after a disturbance. Characteristic generators are then identified in the feature attribution step for matching the extracted dynamic features with the highest similarity, forming a suboptimal basis of system dynamics. In the reconstruction step, generator state variables such as rotor angles and voltage magnitudes are approximated with a linear combination of the characteristic generators, resulting in a quasi-nonlinear reduced model of the original external system. Network model is un-changed in the DEAR method. Tests on several IEEE standard systems show that the proposed method gets better reduction ratio and response errors than the traditional coherency aggregation methods.

  18. Template for Contracting Company Drug Testing for DOE Positions

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Address of Requestor Dear Sir or Madam: Subject: Last name, First name Middle initial - [last four digits of the SSN] xxx-xx-0123 This letter is in response to a request from [insert name of requestor] received on [insert date] to process [insert name] for a Department of Energy (DOE) security clearance in connection with his/her employment as [insert position] with [insert company name] under [insert site office] Contract No.: [insert contract number] Please be advised that your request for a

  19. Contract DE-AC27-08RV14800

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    56 SF30 Continuation Page, Block 14 Page 2 of 3 Purpose of Modification: The purpose of this modification is to make certain additions and changes to the contract: 1. In accordance with DEAR 970.5204-2, Laws, Regulations and DOE Directives (DEC 2000) and FAR Clause 52.243-2, Changes-Cost Reimbursement (AUG 1987) the following are updated: a. In Section C, Table C.5-Summary of Contract Deliverables, revise the Deliverable Due Date for Deliverable Number C.2.3.1-2, 'Integrated Waste Feed Delivery

  20. DOE Exercises 5 Year Option on Washington TRU Solutions Contract...

    Energy Savers [EERE]

    Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP DOE Exercises 5 Year Option on Washington TRU Solutions Contract to Operate WIPP January 18, 2005 - ...

  1. Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (~ii~,Richland Operations Office ~Z4TESO~Richland, Washington 99352 SEP 2 2009 CERTIFIED MAIL Ms. Sarah Washburn Heart of America Northwest 1314 N.E. 5 6 th Street Suite 100 Seattle, Washington 98105 Dear Ms. Washburn: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0067) You requested, pursuant to the Freedom of Information Act (FOJA), the following documents relating to: 1 . "The authorization, decision to use, and actual use of any and all pesticides and herbicides anywhere within the

  2. LANS Contract | National Nuclear Security Administration | (NNSA)

    National Nuclear Security Administration (NNSA)

    LANS Contract LANS Contract Information Management and Operating Contract for the Los Alamos National Laboratory For confirmation of Official Contract Provisions, call: Dan Saiz, Contract Specialist, M&O Contract Support Division at (505) 845-4024. Get Adobe Reader You will need Adobe Acrobat to read many of the files on this site. If you haven't already done so, please download the free Adobe Reader

  3. Dear Citizen:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... the Department of Energy) through Public Land ... Radiological Control Program, engineering and ... are also several smaller citiescommunities (<10,000 people), ...

  4. Dear Colleagues,

    Energy Savers [EERE]

    Earlier in my career, I watched a similar office at Stanford University provide a safe, independent, and confidential environment for university employees to resolve workplace ...

  5. Dear Citizen

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NEPA Planning Summary Secretarial Officers and Heads of Field Orga nizations must submit annual NEPA planning summaries that briefly describe the status of ongoing NEPA compliance...

  6. Dear Mr

    Office of Environmental Management (EM)

    have been jeopardized because of federal funding. Observations and Comments: Over the past several years, the federal government has made several budget cuts to programs around...

  7. Dear Mr

    Office of Environmental Management (EM)

    ... These components are constructed of monel, copper, nickel-plated steel, aluminum, and ... Costs associated with manufacturing include mining, smelting, refining, and ...

  8. Dear Mr

    Office of Environmental Management (EM)

    Energy David K. Garman Sworn in as Under Secretary of Energy David K. Garman Sworn in as Under Secretary of Energy June 23, 2005 - 1:39pm Addthis WASHINGTON, DC - David K. Garman was sworn in today as Under Secretary of Energy for Energy, Science and Environment at a small ceremony held at the Department of Energy (DOE) headquarters in Washington, D.C. Mr. Garman was sworn in by Secretary of Energy Samuel W. Bodman after being unanimously confirmed by the United States Senate on Wednesday,

  9. Dear Mr

    Office of Environmental Management (EM)

    with cleaning up the waste generated by legacy, Cold War and national defense efforts. ... To date, clean-up efforts, as it relates to legacy and Cold War efforts in and around each ...

  10. DEAR 952

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LOAN PROGRAMS OFFICE U. S. DEPARTMENT OF ENERGY energy.gov/lpo I N V E S T I N G in A M E R I C A N E N E R G Y ADVANCED TECHNOLOGY VEHICLES MANUFACTURING LOAN PROGRAM THIS DOCUMENT IS PROVIDED FOR GENERAL INFORMATION PURPOSES ONLY AND DOES NOT CONSTITUTE RULEMAKING BY DOE. Achieving Rising Fuel Economy Standards Creating & Preserving American Manufacturing Jobs Expanding Domestic Manufacturing Deploying New Technology EXPANDING U.S. ADVANCED VEHICLE & COMPONENT MANUFACTURING $25 BILLION

  11. Dear Mr

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD ________________________________________________________________________________________________ Hanford Idaho Nevada Northern New Mexico Oak Ridge Paducah Portsmouth Savannah River ________________________________________________________________________________________________ September 30, 2014 Mark Whitney Acting Assistant Secretary for Environmental Management U.S. Department of Energy, EM-1 1000 Independence Avenue, SW Washington, DC

  12. Dear Mr

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5 ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD ________________________________________________________________________________________________ Hanford Idaho Nevada Northern New Mexico Oak Ridge Paducah Portsmouth Savannah River ________________________________________________________________________________________________ September 30, 2014 Mark Whitney Acting Assistant Secretary for Environmental Management U.S. Department of Energy, EM-1 1000 Independence Avenue, SW Washington, DC

  13. Dear Colleague,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ED, and Mike Kane, the Department's Chief Human Capital Officer, to take the following ... address the following: (1) workforce development; (2) training; (3) work-life balance; ...

  14. Dear Colleague,

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    In support of our efforts, I am directing Associate Deputy Secretary Mel Williams to lead this effort and to work with Bill Valdez, Acting Director of ED, and Mike Kane, the ...

  15. Dear Mr

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    and community outreach for the cleanup programs locally and complex-wide. We look forward to continuing the collaborative work between the boards, DOE, and the public. EM...

  16. Dear Mr

    Office of Environmental Management (EM)

    Department of Energy Commences While Cleanup Continues at Paducah Site Deactivation Project Commences While Cleanup Continues at Paducah Site December 23, 2014 - 12:00pm Addthis Switchyards at the Paducah Gaseous Diffusion Plant will be optimized to meet future needs at the plant as part of EM’s deactivation activities. Switchyards at the Paducah Gaseous Diffusion Plant will be optimized to meet future needs at the plant as part of EM's deactivation activities. Brad Brown takes a sample

  17. Dear Ms

    Office of Environmental Management (EM)

    oral, as well as written. The main purpose of these discussions is to notify [insert name of offeror] of deficiencies and weaknesses in its proposal, as well as other aspects of its proposal that could be altered or explained. These deficiencies, weaknesses and other aspects of the proposal that could be altered or explained are specified in Attachment 1. [insert name of offeror] is requested to meet with the DOE SEB on [insert date] , beginning at [insert time] in [insert location] to discuss

  18. Dear Ms

    Office of Environmental Management (EM)

    in writing. The main purpose of these discussions is to notify [insert name of offeror] of deficiencies and weaknesses in its proposal, as well as other aspects of its proposal that could be altered or explained. These deficiencies, weaknesses and other aspects of the proposal that could be altered or explained are specified in Attachment 1. [insert name of offeror] should address each issue identified in Attachment 1 thoroughly in a written response to DOE. Your response is required no later

  19. Dear Mr

    Office of Environmental Management (EM)

    The enhanced solvent for the Salt Waste Processing Facility at the Savannah River Site is an example of a successful research and development (R&D) project. As the current federal ...

  20. Dear Ray,

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    wire costs as 2,000 per foot in a nuclear power plant). "Up in front of the room, a ... invited (and host funded) talks in France, Peru, Australia, Canada, China, India ...

  1. Dear Mr

    Office of Environmental Management (EM)

    cells Adding more dollars for cleanup from the sale of excess Reducing cumulative environmental insult Reducing long-term monitoring and stewardship costs To facilitate...

  2. Dear Speaker -

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Re: Public Meeting on "Enhancing Resilience in Energy Infrastructure and Addressing ... The meeting will focus on infrastructure vulnerabilities related to the electricity, ...

  3. Dear Mr

    Office of Environmental Management (EM)

    and relative quantities of nuclear waste that were placed in the locations where the waste would be generated or interim stored with an arrow stretched from that location to...

  4. Dear Mr

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford Idaho Nevada Northern New Mexico Oak Ridge Paducah Portsmouth Savannah ... Laboratory Nevada SSAB Northern New Mexico Site EM Citizens Advisory Citizens' ...

  5. Dear Mr

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanford Idaho Nevada Northern New Mexico Oak Ridge Paducah Portsmouth Savannah ... Kentucky, Nevada, New Mexico, Ohio, Oregon, South Carolina, Tennessee and Washington. ...

  6. Dear Mr

    Office of Environmental Management (EM)

    inside the arrows. The 3D visuals were profound and easily understood, and paper, color-coded graphics were provided to the participants in the workshop to keep. The EMSSAB...

  7. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    /: -. !~t. Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 Nav 0 4 ?nn~ 05-AMCP-OO46 Mr. Todd Martin, Chair Hanford Advisory Board 1933 Jadwin, Suite 135 Richland, Washington 99352 Dear Mr. Martin: HANFORD ADVISORY BOARD (HAB) ADVICE #166 -FUND U PLANT AREA REMEDIATION ACTIVITIES In response to your letter dated September 10, 2004, the U.S. Department of Energy, Richland Operations Office (RL), appreciates your recommendations contained in HAB Consensus

  8. Expired_Contracts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Expired Contracts U.S. Department of Energy Carlsbad Field Office Carlsbad Technical Assistance Contractor for the Waste Isolation Pilot Plant Contract Number DE-AT30-05EW03000 U.S. Department of Energy Carlsbad Field Office Management & Operating Contractor for the Waste Isolation Pilot Plant Contract Number DE-AC29-01AL66444 Fee Payment Information (Washington TRU Solutions, LLC) U.S. Department of Energy Carlsbad Field Office Transportation Contractors for the Waste Isolation Pilot Plant

  9. Contract Clause Matrix

    Broader source: Energy.gov [DOE]

    Attached for your information is a corrected Department of Energy Acquisition Regulation contract clause matrix. This corrected clause matrix is also being posted to the Stripes library. The earlier edition incorrectly designated 970.5223-78, Sustainable acquisition, as a required clause. It is only required in contracts under which the contractor operates Government-owned facilities, Government owned fleets or performs construction at a Government-owned facility.

  10. Marti Ayers From: Sent: To: Subject: Dear Marti Ayers: Don Merrill

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ayers From: Sent: To: Subject: Dear Marti Ayers: Don Merrill Sunday, April 10, 2016 6:42 PM FOIA FOIA Request I am requesting information and history about any money your agency or office has given to the Corporation for Public Broadcasting and/or any public radio station, in any form (grants, etc.), as part of an effort to promote your work, support publlc radio or for any other purpose. I believe Southwestem Power Administration may have the records I am seeking. I request them to be in

  11. Microsoft Word - 12.18.13 NEPA UK FT DSEA draft DearReaderLtr.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    William.Gwilliam@netl.doe.gov  Voice (304) 285-4401  Fax (304) 285-4403  www.netl.doe.gov A l b a ny, O R * M o rg a n tow n , W V * Pi t t s b u rg h , PA December 18 , 2013 Dear Reader: The U.S. Department of Energy (DOE) invites comments on the enclosed draft Supplemental Environmental Assessment (draft SEA) for the University of Kentucky Small-Scale Pilot Plant for the Gasification of Coal and Coal-Biomass Blends and Conversion of Derived Syngas to Liquid Fuels via Fischer-Tropsch

  12. Policy Flash 2013-23 Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property

    Broader source: Energy.gov [DOE]

    Attached is Policy Flash 2013-23 Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, 945, 952, and 970 regarding Government Property.

  13. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ZATESO~'P.O. Box 550 E Richland, Washington 99352 11 -SED-0 124 JUL 0 7 2Mt Mr. J. G. Lehew 111, President and Chief Executive Officer CH2M HILL Plateau Remnediation Company Richland, Washington 99352 Dear Mr. Lehew: CONTRACT NO. DE-ACO6-08RL 14788 - TRANSN4ITTAL OF SURVEILLANCE REPORT PLANNING AND EXECUTION OF RADIOLOGICAL WORK (S-1I l-SFD-CHPRC-PFP-002) Pursuant to Clause E. 1, "DOE Inspection and Acceptance," this letter transmits Surveillance Report S-1 I -SED-CHPRC-PFP-002. The

  14. EM Utility Contracts

    Office of Environmental Management (EM)

    22012 EM UTILITY CONTRACT Site State Supplier Executed Contract Type DOE Contract East Tennessee Technology Park TN Tennessee Valley Authority 4272007 Energy supply contract ...

  15. MSA Contracts

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    MSA Contracts U.S. Department of Energy | MSA Subcontracts | Solicitations and Notices | Vendor Registration | Small Business | Subcontractor Forms | Doing Business with Mission Support Alliance Home Hanford.gov | Energy.gov MSA Contracts Definitions EPA Listing Biobased Products Agreements with Environmentally Preferred Products Small Business Conferences/Workshops Contractor Video Clips Small Business Resources Small Business POC's Subcontractors/Subcontracting Goals View Solicitations &

  16. San Francisco Operations Office

    Office of Legacy Management (LM)

    San Francisco Operations Office 1333 Broadway Oakland, California 94612 Dr. Joseph 0. Ward, Chief Radiological Health Section Department of Health Services 744 P Street Sacramento, California, 95814 SUBJECT: Certification Docket of Gilman Hall Dear Dr. Ward: The Department of Energy (DOE) has completed and reviewed the remedial ac- tions of Gilman Hall located at the University of California, Berkeley, California. Based on this review, DOE certifies that the condition of Gilman Hall is

  17. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    j;. ~.Department of Energy Richland Operations Office P.O. Box 550 ZATES~Richland, Washington 99352 July 29, 2010 Certified Mail Mr. Alec Osenbach Heart of America Northwest 1314 NE 56 1hStreet Suite 100 Seattle, Washington 98105 Dear Mr. Osenbach: FREEDOM OF INFORMATION ACT REQUEST (FOI 20 10-01599) You requested, pursuant to the Freedom of Information Act (FOJA), the following information: 1 . Documents and records relating to the potential duration of storage for soil excavated since 2009

  18. Albuquerque Operations Office

    Office of Legacy Management (LM)

    %r © J~4 aDepartment of Energy Albuquerque Operations Office P.O. Box 5400 Albuquerue. New Mexico 87118 JUIl 0 198 Vicinity Property No. CA-401 _ U l Address; Mayer Street Bridgeville, Pennsylvania Cyclops Corporation 650 Washington Road Pittsburgh, Pennsylvania 15228 Dear Sir: Under the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, the Department of Energy (DOE) is authorized to conduct remedial action at properties contaminated with residual radioactive material from

  19. DOE Awards Native American, Tribally-Owned Small Business Contract...

    Energy Savers [EERE]

    Small Business Contract for Support Services to Savannah River Operations Office DOE Awards Native American, Tribally-Owned Small Business Contract for Support Services to ...

  20. Jefferson Lab Contract to be Awarded to Jefferson Science Associates...

    Office of Environmental Management (EM)

    Jefferson Lab Contract to be Awarded to Jefferson Science Associates, LLC for Management and Operation of World-Class Office of Science Laboratory Jefferson Lab Contract to be ...

  1. Energy Department Awards Contract to the University of California...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Contract to the University of California to Manage and Operate Lawrence Berkeley National Laboratory Energy Department Awards Contract to the University of California to Manage and ...

  2. DOE-ORP Contract Management Plans - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan (Rev. 7 September 19, 2014) (PDF) Tank Operations Contract Management Plan TOC Contract Management Plan (October 27, 2008) (PDF) TOC CMP Attachment A Section B...

  3. Contract No. DE-AC04-94AL85000 Modification M0541

    National Nuclear Security Administration (NNSA)

    M0541 Attachment 3 Part III - Section J Appendix H Contractor and Corporate Parent Commitments, Agreements, and Understandings May 1, 2014 The Contractor, Sandia Corporation (hereinafter Sandia), and the Contractor's Parent Organization, Lockheed Martin Corporation (hereinafter LMC), shall in accordance with Part I, Section H, H-20, CONTRACTOR COMMITMENTS, and Part II, Section I, Clause I-83, DEAR 970.5226-3, COMMUNITY COMMITMENT (DEC 2000), of this Contract, take the actions identified below.

  4. contract | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    contract Sandia National Laboratories Contract Process Announced WASHINGTON (May 18, 2016) - The Department of Energy's (DOE) National Nuclear Security Administration (NNSA) has initiated the process to compete the management and operating contract for Sandia National Laboratories (SNL) in Albuquerque, N.M.; Livermore, Calif.; Kauai, Hawaii;... Questions, Comments, and Answers for Draft Request for Proposal Documents DE-SOL-0008470 Responses to Draft Solicitation (Updated May 23, 2016) NNSA

  5. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Contract Option Period: Minimum Fee Maximum Fee Performance Period Fee Available Fee Earned FY2008 $2,550,203 $2,550,203 FY2009 $42,649,069 $36,473,354 FY2010 $69,660,249 $64,874,187 FY2011 $48,750,000 $44,329,841 FY2012 $48,950,000 $41,492,503 FY2013 $122,283,499 $66,203,499 FY2014 $144,860,240 $138,233,496 FY2015 $45,730,000 $37,853,814 FY2016 $44,930,000 $0 Cumulative Fee $570,363,260 $432,010,897 EM Contractor Fee Savannah River Site Office, Aiken, SC Management & Operating Contract June

  6. TRW CONTRACT

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    J-I- 1 SECTION J APPENDIX I REPORTS & PLANS REQUIREMENTS LIST Contract No.: DE-RW0000005 QA:QA J-I- 2 PART III -LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS SECTION J - LIST OF ATTACHMENTS APPENDIX I - REPORTS & PLANS REQUIREMENTS LIST Reporting Requirement Freq. Distribution Date Due 1. Annual Work Plans Y OPM&P, OGS As Directed 2. S/C small/disadvantaged contract Report (FM294/5) S CO April 25 and October 25 3. Cyber Security Program A OGS As Required, every 2 yrs 4.

  7. WAI Contract Mods - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Mods Office of River Protection ORP Contracts & Procurements Home DOE-ORP Contract Management Plans DOE-ORP Prime Contracts BNI Contract BNI Contract Modifications ATL Contract ATL Contract Modifications WRPS Contract WRPS Contract Modifications CH2M Contract CH2M Contract Modifications WAI Contract WAI Contract Mods DOE-ORP Contracting Officers DOE ORP Contracting Officer Representatives DOE ORP Purchase Card Buyers WAI Contract Mods Email Email Page | Print Print Page | Text

  8. ATL Contract Modifications - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contract Modifications Office of River Protection ORP Contracts & Procurements Home DOE-ORP Contract Management Plans DOE-ORP Prime Contracts BNI Contract BNI Contract Modifications ATL Contract ATL Contract Modifications WRPS Contract WRPS Contract Modifications CH2M Contract CH2M Contract Modifications WAI Contract WAI Contract Mods DOE-ORP Contracting Officers DOE ORP Contracting Officer Representatives DOE ORP Purchase Card Buyers ATL Contract Modifications Email Email Page | Print Print

  9. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    SciTech Connect (OSTI)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  10. Aligning Contract Incentives & Contract Mgt Trends - David Leotta...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Aligning Contract Incentives & Contract Mgt Trends - David Leotta, Director, Office of Contract Management, OAPM Aligning Contract Incentives & Contract Mgt Trends - David Leotta, ...

  11. DOE - NNSA/NFO -- NSTEC Contract Mods

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NSTEC Contract Modifications NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office National Security Technologies, LLC Contract Modifications National Security Technologies, LLC is the Management and Operating contractor for the Nevada National Security Site and satellite facilities of the Department of Energy's National Nuclear Security Administration Nevada Field Office. The contract valued at approximately $2,500,000,000 was awarded on March 28, 2006. The contract period of

  12. Templates for Approval to Continue Sponsorship as a Federally Funded Research Development Center (FFRDC) and Authorization for a Management and Operating (M&O) Type of Contract

    Broader source: Energy.gov [DOE]

    The purpose of this Flash is to provide you copies of the subject templates. These templates were developed to standardize the format for approving sponsorship as a FFRDC and authorization to enter into an M&O type of contract. Two versions of each template were developed. One version covers non-competitive extensions and the other covers competitions. Word versions of the four templates will be available in the STRIPES Library.

  13. PRC Contract Management Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ......... 11 3.4 Contract Payment Method ............ 14 3.6 Conditional Payment of Fee Contract Clause ...

  14. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Fee Maximum Fee Performance Period Fee Available Fee Earned FY2009 $18,417,000 $17,667,000 FY2010 $28,613,905 $28,141,405 FY2011 $33,334,089 $33,300,000 FY2012 $23,507,000 $23,078,500 FY2013 $20,894,699 $19,073,701 FY2014 $25,073,192 $21,887,968 FY2015 $30,000,000 $28,182,000 FY2016 $38,000,000 $5,075,333 Cumulative Fee $217,839,885 $176,405,907 $0 EM Contractor Fee Office of River Protection - Richland, WA Tank Operations Contract June 2016 $217,839,885 October 1, 2008 - September 30, 2013

  15. FILL IN OF CONTRACT CLAUSES

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FILL IN OF CONTRACT CLAUSES Certain solicitation clauses have been uploaded with the solicitation, as a separate Word document (Clauses.doc), which are to be completed by the Offeror, saved and submit as File 3. All areas marked as TBD in these clauses are to be filled in by the Offeror, this information shall then be utilized to complete these specific areas prior to contract award. B.1 SERVICES BEING ACQUIRED - INFORMATION TECHNOLOGY OPERATIONS AND MAINTENANCE SUPPORT SERVICES The Contractor

  16. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    Cost (Price of base): Contract Base Period: Contract Option Period: Minimum Fee Maximum Fee (Base Only) Performance Period Fee Available Fee Earned FY2012 15,763,807 15,087,078...

  17. Contract Agreement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    c. There will be no discrimination among applicants on the basis of race, color, religion or sex. 3. AGENCY will operate within the parameters given in the latest version of...

  18. LANS Bridge Contract | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    LANS Bridge Contract LANS Bridge Contract The purpose of this contract is to perform the EM-funded work at LANL outside of the National Nuclear Security Administration (NNSA) Management and Operations (M&O) contract, for purposes of serving as a "bridge" to a contractor other than the LANL M&O contractor. This Bridge Contract will facilitate transition of the work from NNSA to DOE/EM oversight, with minimal disruption to the national security missions of LANL. In performing

  19. Contract Administration & Business Management | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Contract Administration & Business Management The SFO Contract Administration and Business Management (CABM) office is responsible for providing direction, day-to-day oversight and contract administration activities related to the Sandia National Laboratories Management and Operating (M&O) contract and associated business management functions such as information technology, cyber security, human resources, purchasing, personal property management, Inspector

  20. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Contractor: Contract Number: Contract Type: Total Estimated Contract Cost: Contract Base Period: Contract Option Period: Minimum Fee Maximum Fee Performance Period Fee Available Fee Earned FY2011 $6,190,992 $5,779,687 FY2012 $16,380,944 $14,173,044 FY2013 $16,972,816 $12,693,413 FY2014 $15,520,007 $13,207,526 FY2015 $14,269,197 $10,503,998 FY2016 Base Period $24,350,863 March 29, 2016- September 30, 2017 $28,251,114 $6,823,811 October 1, 2017- September 30, 2018 $18,834,076 October 1, 2018-

  1. Oak Ridge Operations.

    Office of Legacy Management (LM)

    4s - 22 Department of Energy Oak Ridge Operations. S~I9J>liB~~ ~P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director Pennsylvania Department of Environmental Resources 400 Waterfront Drive Pittsburgh, Pennsylvania 15222-4745 Dear Mr. Duritsa: FUSRAP PENNSYLVANIA SITES - LETTER OF APPRECIATION I would like to express my appreciation for the assistance Jim Yusko, Hark Russell, Dennis Angelo, Steve Hepler, and Roy Woods provided to the

  2. Rich land Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TG Department of Energy Rich land Operations Office P.O. Box 550 AES Richland, Washington 99352 CERTIFIED MAIL NOV~ 2 10 2009 Mr. Gerald Pollet Heart of America Northwest 1314 N.E. 5 6 th Street Suite 100 Seattle, Washington 98105 Dear Mr. Pollet: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0054) The purpose of this letter is to inform you that we have withdrawn our response dated September 14, 2009, and have issued the following determination regarding item 8 of your request. In response to

  3. Rich land Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rich land Operations Office P.O. Box 550 July 10, 2009 CERTIFIED MAIL Mr. Ryan Jarvis Heart of America Northwest 1314 N.E. 56h" Street Suite 100 Seattle, Washington 98105 Dear Mr. Jarvis: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0054) Pursuant to the Freedom of Information Act (FOJA), you requested the following information as stated below: 1. "The RCRA permit (both Parts A and B) for the mixed waste disposal trenches 31 and 34 located in the 200 West area of Hanford, including,

  4. Richland Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    to) Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 r OV( 4 2009 CERTIFIED MAIL Mr. Bryan Evenson Thorner, Kennedy & Gano P.S. P.O. Box 1410 Yakima, Washington 98907-14 10 Dear Mr. Evenson: FREEDOM OF INFORMATION ACT REQUEST (FOI 2010-00208) Pursuant to the Freedom of Information Act, you requested two prints, a negative, and a high resolution digital scan of May 1943 aerial photographs L26-12 and L-26-3. In addition, you requested the photographs be

  5. Idaho Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 2. 2010 Josh Berman 2 N. Riverside Plaza, Suite 2250 Chicago, IL 60606 SUBJECT: FOIA Response (10-034) (lD-201O-01859-F)(OHA Case No. TFA-0404) (OM-PA-I0- 062) Dear Mr. Berman: This is a revised final response from the Idaho Operations Office (DOE-ID), regarding your July 22, 2010, Freedom ofInformation Act (FOIA) request. In that letter you requested: * Richard Boardman Emails * WoodiGrubick Emails FY 2006 * Wood/Grubick Emails FY 2007 * WoodiGrubick Emails FY 2008 * WoodiGrubick

  6. Idaho Operations Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    31,2010 Rod Wetsch 420 County Road 26 Beulah, ND 58523 SUBJECT: FOIA Response (10-035) (ID-2010-01986-F) (OM-PA-I0-061) Dear Mr. Wetsch: This is in final response from the Idaho Operations Office (DOE-ID), regarding your June 2, 2010, Freedom of Information Act Request. In that e-mail you requested documents relating to: "vulnerabilities of running desktop applications (Word, Excel, and PowerPoint) on the same platform as the process control systems applications." The administrator for

  7. Contracts | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Information Center » Contracts Contracts General Construction and Environmental Regulatory Support at the Los Alamos National Laboratory (LANL) Contractor: TSAY Corporation Contract: DE-EM0003298 - Base DOE Contracting Officer: Chris Lockhart Christopher.Lockhart@em.doe.gov Support EM LA Airport Landfill Cover Project by providing ~40,000 tons of soil Contractor: TSAY Corporation Contract: DE-DT0010454 - Task Order #4 DOE Contracting Officer: Chris Lockhart Christopher.Lockhart@em.doe.gov

  8. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Second Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast ...

  9. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 ...

  10. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 nd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. ...

  11. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    3 rd Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. ...

  12. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fourth Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY ...

  13. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Forecast ...

  14. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fourth Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Performance Metric FY 2012 Target FY 2012 Final FY ...

  15. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Third Quarter Overall Contract and Project Management Improvement Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 ...

  16. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Second Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Actual FY ...

  17. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 st Quarter Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2009 Target FY 2009 Actual Comment 1. ...

  18. Contract/Project Management

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 4 th Quarter Metrics Final Overall Contract and Project Management Performance Metrics and Targets ContractProject Management Performance Metrics FY 2008 Target FY 2008 Actual ...

  19. Contract Management Plan Outline

    Energy Savers [EERE]

    of all necessary actions for effective contracting, ensuring compliance with the terms of the contract, and safeguarding the interests of the United States in its...

  20. Using Other Agencies' Contracts

    Broader source: Energy.gov [DOE]

    The Department of Energy's (DOE) use of other agencies contracts has increased in recent years. Other agency contracts include Economy Act interagency agreements, Franchise Fund Organizations,...

  1. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Third Quarter Overall Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2010 Target FY 2010 Forecast FY ...

  2. Contract/Project Management

    Broader source: Energy.gov (indexed) [DOE]

    Contract and Project Management Performance Metrics and Targets 1 ContractProject Management Primary Performance Metrics FY 2011 Target FY 2011 Actual & Forecast FY 2011 Pre- & ...

  3. Contract Types Used For Federal Utility Energy Service Contracts |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Project Financing » Utility Energy Service Contracts » Contract Types Used For Federal Utility Energy Service Contracts Contract Types Used For Federal Utility Energy Service Contracts Contract Types Used For Federal Utility Energy Service Contracts Several types of contracts are used for federal utility energy service contracts (UESCs). Many agency sites procure electricity services under a contract with the local utility, and most of these contracts have provisions

  4. NNSA NPO M&O Contract Placement Team receives DOE 2015 Secretary...

    National Nuclear Security Administration (NNSA)

    NPO M&O Contract Placement Team receives DOE 2015 Secretary's Achievement Award Wednesday, ... (NPO) Management and Operating (M&O) Contract Placement team recently received the ...

  5. DOE - NNSA/NFO -- NSTEC Contract Mods

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Modifications NNSA/NFO Language Options U.S. DOE/NNSA - Nevada Field Office TechSource, Inc. Contract Modifications TechSource, Inc. is the security support contractor responsible for operating the Badge Office, managing the Vulnerability Assessment lab, maintaining OPSEC and security awareness programs, security clearances, and classified matter protection. The contract valued at approximately $12,383,205 was awarded on 5/28/2015. The contract period of performance is July 1, 2015 through June

  6. Energy Savings Performance Contracting | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Savings Performance Contracting Energy Savings Performance Contracting Energy Savings Performance Contracting (ESPC) is a budget-neutral approach to make building improvements that reduce energy and water use and increase operational efficiency. By partnering with an energy service company (ESCO), a facility owner can use an ESPC to pay for today's facility upgrades with tomorrow's energy savings-without tapping into capital budgets. State and local governments can implement ESPC projects in

  7. Communication Consultant Contract

    Broader source: Energy.gov [DOE]

    Communication Consultant Contract, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  8. Microsoft Word - MOD M229 FAR-DEAR Attach 1 - FINAL

    National Nuclear Security Administration (NNSA)

    Modification No. M229 Contract No. DE-AC54-00AL66620 Page No. 2 of 2 The purpose of this Modification is to incorporate the following: A. Replace Part III, LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS, Section J - LIST OF ATTACHMENTS, Appendix A - PERSONNEL APPENDIX in its entirety to update REIMBURSEMENT AUTHORIZATIONS, TABLE OF CONTENTS, and to replace Section II. BENEFITS PROGRAM, B.4.e.(6), B.4.f.(4), and B.4.j.(1)(a)&(b) (See Attachment 1). B. Replace Part III - LIST OF DOCUMENTS,

  9. Voluntary Protection Program Onsite Review, Tank Farm Operations...

    Office of Environmental Management (EM)

    Tank Farm Operations Contract - November 2010 Voluntary Protection Program Onsite Review, Tank Farm Operations Contract - November 2010 November 2010 Evaluation to determine ...

  10. Office of Environmental Management MAJOR CONTRACTS SUMMARY

    Office of Environmental Management (EM)

    12 - 93017 1.33B Waste Isolation Pilot Project Management and Operating Contract Cost plus award fee 5-Yr Option 100117 - 93022 Portage, Inc. DE-EM0004007 Base Period 116...