1

Use of Management and Operating Contractor and National Laboratory Employees for Services in the D.C. Area  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Notice provides requirements for Headquarters use of employees from Management and Operating (M&O) contractors and National Laboratories and establishes limitations on payments to those employees whose assignments to Headquarters exceed 365 days.

1997-03-05T23:59:59.000Z

2

Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish policies and procedures for management of DOE, including NNSA, Management and Operating (M&O) and other facility management contractor employees assigned to the Washington, D.C., area. Cancels DOE O 350.2.

2003-10-29T23:59:59.000Z

3

Supplemental Requirements for the Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Notice supplements review and approval requirements of DOE O 350.2A, Use of Management and Operating (M&O) or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area, dated 10-29-03.

2005-10-19T23:59:59.000Z

4

Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C. Area  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish policies and procedures for management of Department of Energy (DOE), including National Nuclear Security Administration (NNSA), management and operating (M&O) and other facility management contractor employees assigned to the Washington, D.C. area. Cancels DOE O 350.2A

2011-05-31T23:59:59.000Z

5

Use of Facility Contractor Employees for Services to DOE in the Washington, D.C., Area  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To clarify and modify policies and procedures for management of Department of Energy (DOE) facility contractor employees located in the Washington, D.C., area. A facility contractor employee is any employee of either a contractor responsible for managing a Department-owned facility, such as a National Laboratory, or a subcontractor of such a contractor. Facility contractor means any contractor performing under a Management and Operating (M&O), Management and Integration (M&I), or Environmental Restoration Management Contractor (ERMC) contract awarded by a DOE contracting officer. Canceled by DOE O 350.2.

1999-04-15T23:59:59.000Z

6

Department of Energy Honors Hanford Site Contractor for Employee...  

Office of Environmental Management (EM)

Department of Energy Honors Hanford Site Contractor for Employee Involvement and Management Leadership in Safety and Health Department of Energy Honors Hanford Site Contractor for...

7

Contractor Employee Pension and Medical Benefits Policy  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To ensure that reimbursement of costs incurred by Department of Energy (DOE) contractors' pension and medical benefits are reasonable in accordance with applicable laws, regulations and contract requirements and reflect prudent business practices. This directive has been suspended as of June 19, 2006, for 1 year. For more information, see DOE N 251.66.

2006-06-19T23:59:59.000Z

8

Audit of the Department of Energy`s management of field contractor employees assigned to headquarters and other federal agencies  

SciTech Connect (OSTI)

The Department of Energy (Department) has spent at least $76 million annually for field contractor employee support in Headquarters and other Federal agencies. The employees were to provide technical expertise and experience critical to Department operations and programs. Overall, the audit was performed to determine if the Department was managing the use of field contractor employees assigned to Headquarters and other Federal agencies. Specifically, it was to determine whether the Department reviews and evaluates the costs for the use of contractor employees, is reimbursed for contractors working at other Federal agencies, and had implemented corrective actions proposed as the result of a prior audit report on this subject. The Department did not effectively manage the use of field contractor employees assigned to Headquarters and other Federal agencies. Specifically, the Department was unable to identify all contractor employees assigned to the Washington, DC area or determine the total cost of maintaining them; some employees were providing routine support and administrative services rather than unique program expertise; and several of the Department`s contractors had assigned their employees to work in other agencies without receiving full reimbursement for their services. In addition, the Department did not fully implement the corrective actions it agreed to in the prior audit report. Recommendations were made for the Deputy Secretary based on the audit findings. 3 tabs.

NONE

1997-12-05T23:59:59.000Z

9

Employee-Focused Structure Helps Produce Upgrades for Contractor...  

Energy Savers [EERE]

at the camera, dressed in jeans and polo shirt. Progressive Building Solutions, an energy efficiency contractor participating in Seattle, Washington's Community Power Works...

10

Worker Protection Management for DOE Federal and Contractor Employees  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Establishes the framework for an effective worker protection program that will reduce or prevent injuries, illnesses, and accidental losses by providing DOE Federal and contractor workers with a safe and healthful workplace. Cancels DOE O 440.1.

1998-03-27T23:59:59.000Z

11

Worker Protection Management for DOE Federal and Contractor Employees  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Establishes the framework for an effective worker protection program that will reduce or prevent accidental losses, injuries, and illnesses by providing DOE Federal and contractor workers with a safe and healthful workplace. Chg 1, 10-26-95; Chg 2, 10-26-96.

1995-09-30T23:59:59.000Z

12

Charitable Giving by EM Employees, Contractors Tops $800,000...  

Broader source: Energy.gov (indexed) [DOE]

Site Celebrates 21 Years of Bringing Joy to Kids Energy Department employee Tyesha Bennett and her family gleaned 4,400 pounds of sweet potatoes as part of Feds Feed Families |...

13

Use of Facility Contractor Employees for Services to DOE in the Washington, D.C., Area  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To clarify and modify policies and procedures for management of Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facility contractor employees located in the Washington, D.C., area. Cancels DOE N 350.5. Certified 12-28-06. Canceled by DOE O 350.2A.

2001-07-12T23:59:59.000Z

14

OLMS Fact Sheet Obligation of Federal Contractors to Notify Employees of  

E-Print Network [OSTI]

OLMS Fact Sheet Obligation of Federal Contractors to Notify Employees of Their Rights Under Federal) the Department of Labor's Office of Labor-Management Standards (OLMS) at (202) 693-0123 or www.olms.dol.gov; or (3) field offices of the Department of Labor's OLMS or Office of Federal Contract Compliance Pro

Oklahoma, University of

15

PART 708 -- DOE CONTRACTOR EMPLOYEE PROTECTION PROGRAM | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment ofOil's Impact on OurSempriusEnergy PART 708 -- DOE CONTRACTOR

16

Management and operating contractor plan for transition to the project Hanford Management Contractor  

SciTech Connect (OSTI)

This is Revision 1 to the M{ampersand}O Contractor Plan for Transition to the Project Hanford Management Contractor.

Waite, J.L., Westinghouse Hanford

1996-06-27T23:59:59.000Z

17

Notice of Intent to Revise DOE O 350.2B, Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The objective of this revision is to incorporate a more performance based risk management approach into the oversight and management of these assignments. The revision will result in a reduction of DOE requirements, increased delegation of management responsibilities to sponsoring program organizations, elimination of reporting requirements and institutionalizing DOE-wide cost constraints for contractor domestic assignments. Approved 3-20-15.

2015-03-20T23:59:59.000Z

18

Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)  

SciTech Connect (OSTI)

This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impact to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.

Waite, J.L.

1996-04-12T23:59:59.000Z

19

Worker Safety and Health Program for DOE (Including the National Nuclear Security Administration) Federal and Contractor Employees  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This document was developed to assist the Department of Energy (DOE or the Department) Federal and contractor employees in effectively developing, managing, and implementing a worker safety and health program. Cancels DOE G 440.1-1A and DOE G 440.1-8. Adm Chg 1, dated 3-22-13.

2011-10-20T23:59:59.000Z

20

Worker Safety and Health Program for DOE (Including the National Nuclear Security Administration) Federal and Contractor Employees  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This document was developed to assist the Department of Energy (DOE or the Department) Federal and contractor employees in effectively developing, managing, and implementing a worker safety and health program. Cancels DOE G 440.1-1A and DOE G 440.1-8. Adm Chg 1, dated 3-22-13, cancels DOE G 440.1-1B.

2011-10-20T23:59:59.000Z

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Employee Job Task Analysis (EJTA) PIA, Richland Operations Office...  

Office of Environmental Management (EM)

Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland Operations Office Employee Job Task Analysis (EJTA) PIA, Richland...

22

Office of Employee Development Operational Efficiency Project  

E-Print Network [OSTI]

Office of Employee Development Operational Efficiency Project Survey Summary from Supervisory Staff the University titled "Operational Efficiency Project." Its mandate was to gather information, evaluate current operations, review benchmarks and best practices, and develop organizational and/or cost saving alternatives

Huang, Jianyu

23

2014-02 Acquistion Letter 2014-01: Management and Operating Contractor...  

Broader source: Energy.gov (indexed) [DOE]

2014-02 Acquistion Letter 2014-01: Management and Operating Contractors' Audit Coverage of Cost-Reimbursement Subcontracts 2014-02 Acquistion Letter 2014-01: Management and...

24

Emergency preparedness for the small oilfield contractor  

SciTech Connect (OSTI)

Changes in the oil and gas industry have been dramatic in recent years. Operators have consolidated field office facilities and downsized staffing at many of their remaining facilities. As a result, operators are turning to independent Contractors as a method of controlling both peak personnel demands and selected production functions. With these changes in the business environment, the role of the specialized contractor has been greatly expanded. Tasks Diane performed by operator employees are now ongoing services provided by the contractor. Their performance can Taken be exemplary until a major emergency occurs. Emergency response can no longer be considered a secondary issue. Every contractor, small or large, must be equally prepared for an emergency. Their ability to address emergency incidents will have a direct effect in their success. This paper is a presentation of the actual learning experiences of one oilfield contractor confronted with the ask of emergency preparedness, more specifically a small contractor. Oilfield service contractors commonly employ field personnel who work for extended periods of time without direct supervision. These employees may singularly or collectively float between sites or anchor one site. Operating sites might be localized or spread over a vast geographical area. Because of the uniqueness of their situation, direct supervision is minimal and the employees will shoulder greater responsibilities and authority. The contractor must evaluate operating conditions and develop an approach which will achieve the optimum results.

Reavis, H.C.

1995-12-01T23:59:59.000Z

25

Employee vs. Independent Contractor Checklist When contracting for services, you must evaluate whether the Internal Revenue Service (IRS) would consider the person  

E-Print Network [OSTI]

Employee vs. Independent Contractor Checklist When contracting for services, you must evaluate for the contracted result of the work, not the manner or method used to accomplish the work solely controls/her own prices for goods and fees for service can terminate contract while not terminating his

Caughman, John

26

Office of Inspector General report on audit of Department of Energy management and operating contractor available fees  

SciTech Connect (OSTI)

The Office of Procurement and Assistance Management has proposed changes to the method used to annually calculate and negotiate ``for profit`` management and operating contractor available fees. This proposal will increase contractor fees in exchange for the contractor`s purported assumption of additional risk. In 1991, the Department, through the Accountability Rule, increased contractor fees as an incentive to improve contractor performance and accountability. Despite the lack of measurable benefits of this effort, the Department is crafting a new fee policy which will, depending upon how it is executed, increase fees above the amount provided through the Accountability Rule as an incentive to the Department`s management and operating contractors. The objective of the audit was to determine whether the Department`s proposed change to the fee structure for determining management and operating contractor fees will be cost effective. This report describes the study`s approach, its findings and recommendations, management and auditor comments, and includes appendices with further data.

NONE

1996-05-01T23:59:59.000Z

27

Third-party/shared savings initiatives at DOE's government-owned/contractor-operated sites  

SciTech Connect (OSTI)

To promote energy conservation at its government owned/contractor operated (GOCO) facilities, DOE implemented the In-house Energy Management (IHEM) Program. In early FY 1984, the IHEM program became interested in the concept of third-party financing as a potential supplement for its appropriated budget. The basic approach to this activity is discussed, including some of the initial concerns of third-party/shared savings financing at DOE facilities. The legal and procurement issues involved are discussed in detail. Planned initiatives are also discussed.

Petrolati, V.P.

1986-03-01T23:59:59.000Z

28

Report on audit of Department of Energy`s contractor salary increase fund  

SciTech Connect (OSTI)

The Department of Energy (Department) uses contractors to operate its facilities and compensates contractor employees based on their skills, complexity of jobs, and work performance. Thirty-one of the Department`s major contractors reported a total payroll of $4.3 billion and $4.4 billion during 1994 and 1995, respectively. The 31 contractors also reported awarding salary increases of $18 million for 1994 and $200 million for 1995. The purpose of the audit was to review the process used to determine and approve the amount of salary increases for contractor employees. The specific audit objective was to determine whether salary increases received by contractor employees were in accordance with Departmental policies and procedures. The Department of Energy Acquisition Regulation (DEAR) requires that contractor salary actions be within specific limitations, supportable, and approved prior to incurrence of costs. In addition, the Secretary of Energy imposed a 1 year salary freeze on the merit portion of management and operating contractor employee salaries for each contractor`s Fiscal Year 1994 compensation year. However, a fund for promotions and adjustments was approved but limited to 0.5 percent of payroll for the year. A review of eight major contractors showed that six complied with the Department`s policies on salary increases. The other two gave salary increases that were not always in accordance with Departmental policies. This resulted in both contractors not fully complying with the pay freeze in 1994 and exceeding their salary increase fund budgets in 1995. If these two contractors had implemented Department and contract requirements and contracting officers had properly performed their contract administrative responsibilities concerning salary increase funds, both contractors would have frozen salary increases and would not have exceeded their annual budgets.

NONE

1997-04-04T23:59:59.000Z

29

Occupational Safety and Health Program for DOE Contractor Employees at Government-Owned Contractor-Operated Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Cancels DOE O 5483.1. Canceled by DOE O 440.1 of 9-30-1995 and by DOE N 251.4 & para. 2a, 2b, 2c of Chapter III canceled by DOE O 231.1.

1983-06-22T23:59:59.000Z

30

Department of Energy Employee Concerns Program Guide  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Department of Energy (DOE) recognizes that free and open expression of DOE Federal and contractor and subcontractor employee concerns is essential to safe and efficient accomplishment of DOE's missions. DOE employees and any contractor or subcontractor fulfilling DOE's mission have the right and responsbility to report concerns relating to the environment, safety, health, or management of Department operations. The guide provides methods of implementing requirements of DOE O 442.1.

1999-02-01T23:59:59.000Z

31

Memorandum requesting a clarification of the circumstances under which a DOE Government Owned Contractor Operated (GOCO) facility  

Broader source: Energy.gov [DOE]

Memorandum requesting a clarification of the circumstances under which a DOE Government Owned Contractor Operated (GOCO) facility may be considered a laser manufacturer and subject to FDA laser manufacturer requirements and other points of interpretation of the FDA Exemption Letter, 78EL-01DOE (DOE exemption or exemption) by the LSSG for GOCG facilities.

32

DOE General Counsel Issues Arbitration Guidance for Management and Operations Contractors  

Broader source: Energy.gov [DOE]

Washington, DC - The Office of the General Counsel, in conjunction with the Office of General Counsel of the NNSA, has reviewed the question of whether Department of Energy contractors can include...

33

CRAD, Conduct of Operations- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February, 2007 assessment of the Conduct of Operations Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory, High Flux Isotope Reactor.

34

Solar Installation Contractor  

Broader source: Energy.gov [DOE]

Alternate Title(s):General Contractor, Electrical or Plumbing Contractor, Construction Manager, Project Superintendant

35

Comparison of management, overhead, and direct costs of six projects managed by the Department of Energy and Government-Owned, Contractor-Operated Laboratories  

SciTech Connect (OSTI)

The report covers management, overhead, and direct cost data on six DOE projects - three managed directly by DOE, and three managed for DOE by government-owned, contractor-operated (GOCO) laboratories. These data provide comparison for decisions on contracting out for project management services. (GHT)

Not Available

1981-09-30T23:59:59.000Z

36

Tank Farm Contractor Operation and Utilization Plan [SEC 1 Thru 3  

SciTech Connect (OSTI)

This document updates the operating scenario and plans for feed delivery to BNFL Inc. of retrieval and waste from single-shell tanks, and the overall process flowsheets for Phases 1 and 2 of the River Protection Project. The plans and flowsheets are updated with the most recent guidance from ORP and tank-by-tank inventory. The results provide the technical basis for the RTP-2 planning effort. Sensitivity cases were run to evaluate the effect of changes on key parameters.

KIRKBRIDE, R.A.

2000-04-19T23:59:59.000Z

37

Solar Contractor Licensing  

Broader source: Energy.gov [DOE]

The California Contractors State License Board administers contractor licenses. The C-46 Solar Contractor license covers active solar water and space heating systems, solar pool heating systems,...

38

Contractor Protective Force  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Manual establishes requirements for the management and operation of the U.S. Department of Energy contractor protective forces. Cancels: DOE M 470.4-3 Chg 1, CRD (Attachment 2) only, except for Section C. Canceled by DOE O 473.3.

2008-11-05T23:59:59.000Z

39

Project W-519 CDR supplement: Raw water and electrical services for privatization contractor, AP tank farm operations  

SciTech Connect (OSTI)

This supplement to the Project W-519 Conceptual Design will identify a means to provide RW and Electrical services to serve the needs of the TWRS Privatization Contractor (PC) at AP Tank Farm as directed by DOE-RL. The RW will serve the fire suppression and untreated process water requirements for the PC. The purpose of this CDR supplement is to identify Raw Water (RW) and Electrical service line routes to the TWRS Privatization Contractor (PC) feed delivery tanks, AP-106 and/or AP-108, and establish associated cost impacts to the Project W-519 baseline.

Parazin, R.J.

1998-07-31T23:59:59.000Z

40

Report on Audit of the Department of Energy Program Offices' Use of Management and Operating Contractor Employees, IG-0392  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments onReply Comments of SouthernJune 6, 1996 REPLY TO ATTN

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Uinit Contractor Operational Readiness Review, June 2012  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalancedDepartmentRestrictions on Federal EmployeestheReview of theContractor

42

Solar Contractor Licensing  

Broader source: Energy.gov [DOE]

Utah's Division of Occupational and Professional Licensing requires installers of solar energy systems to be licensed contractors. General electrical contractors carrying an S200 license are...

43

STEP Preferred Contractors  

Broader source: Energy.gov [DOE]

STEP Preferred Contractors, from the Tool Kit Framework: Small Town University Energy Program (STEP).

44

Evaluation of the US Department of Energy's occupational safety and health program for its government-owned contractor-operated facilities  

SciTech Connect (OSTI)

An evaluation of the Department of Energy's (DOE) occupational safety and health programs for its government-owned contractor-operated (GOCO) activities was completed by the Department of Labor's Occupational Safety and Health Administration (OSHA) in response to DOE's request for assistance. The purpose of the evaluation was to provide DOE with a blueprint for strengthening these programs. Under the leadership of Secretary of Energy James Watkins, DOE has launched a number of significant initiatives designed to instill a new culture of safety and health accountability within the Department. The Secretary of Energy's personal concern for safety and health was not being reflected in the priorities, resource allocation decisions and planning of DOE and GOCO managers. The report recommends that DOE consider major organizational changes, changes in priorities, and the development of operationally meaningful safety and health goals and objectives together with the accountability systems necessary to measure progress.

Not Available

1990-12-01T23:59:59.000Z

45

Workplace Violence Prevention: Employee Awareness Class  

Broader source: Energy.gov [DOE]

Registration:Federal employees should sign up directly in CHRIS (ďNTC Workplace ViolenceĒ Course #002647) for one of the sessions below.Approved contractor employees should email Steven Martinez...

46

Carlsbad Field Office Technical Assistance Contractor Shares In Top Honor  

Broader source: Energy.gov [DOE]

CARLSBAD, N.M. Ė The Carlsbad Field Office Technical Assistance Contractorís (CTAC) parent company, Portage, Inc., and its 400 employees nationwide recently achieved a significant milestone by exceeding one million hours worked over 560 days without a lost-time injury or illness.

47

Idaho Cleanup Contractor Surpasses Significant Safety Milestones  

Broader source: Energy.gov [DOE]

IDAHO FALLS, Idaho Ė For the second time in a little over a year, employees with DOE contractor CH2M-WG Idaho (CWI) supporting EM at the Idaho site have achieved 1 million hours without a recordable injury. They also worked more than 1.7 million hours without a lost work-time injury.

48

Evaluation of the US Department of Energy's occupational safety and health program for its government-owned contractor-operated facilities  

SciTech Connect (OSTI)

The purpose of this report is to present to Secretary of Energy James Watkins the findings and recommendations of the Occupational Safety and Health Administration's (OSHA) evaluation of the Department of Energy's (DOE) programs for worker safety and health at DOE's government-owned contractor-operated (GOCO) nuclear facilities. The OSHA evaluation is based on an intensive and comprehensive review and analysis of DOE's worker safety and health programs including: written programs; safety and health inspection programs; and the adequacy of resource, training, and management controls. The evaluation began on April 10, 1990 and involved over three staff years before its conclusion. The evaluation was initiated by former Secretary of Labor Elizabeth Dole in response to Secretary of Energy James Watkins' request that OSHA assist him in determining the actions needed to assure that DOE has an exemplary safety and health program in place at its GOCOs. 6 figs.

Not Available

1990-12-01T23:59:59.000Z

49

Labor Standards Compliance, Contractor Labor Relations, and Contractor Workforce Restructuring Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To ensure that contractors pursue collective bargaining practices that promote efficiency and economy in contract operations, judicious expenditure of public funds, equitable resolution of disputes, and effective collective bargaining relationships; that contractor relations/human resources specialists achieve consultations with management and operating contractors; and that appropriate labor standards are included in DOE/NNSA contracts and subcontracts. Cancels Chapters I-III of DOE O 350.1 Chg 4. Does not cancel other directives.

2014-09-29T23:59:59.000Z

50

Solar Contractor Licensing  

Broader source: Energy.gov [DOE]

Nevada law requires that solar energy system installers be licensed by the Nevada State Contractors Board. Contractors may be licensed under License Classification C-37 (solar contracting for solar...

51

Solar Contractor Licensing  

Broader source: Energy.gov [DOE]

The Arizona Registrar of Contractors does not offer a general solar electric contractor license, but the state's C-11/L-11 electrical license covers solar electric installations. C-11 licenses are...

52

Solar Heating Contractor Licensing  

Broader source: Energy.gov [DOE]

Michigan offers a solar heating contractor specialty license to individuals who have at least three years of experience installing solar equipment under the direction of a licensed solar contractor...

53

Renewable Energy Contractor Licensing  

Broader source: Energy.gov [DOE]

Oregon requires trade licenses for people installing solar energy equipment, and contractor licenses for the companies that do construction.

54

Solar Contractor Licensing  

Broader source: Energy.gov [DOE]

Hawaii offers several specialty licenses for solar contractors through Hawaiiís Department of Commerce and Consumer Affairs. The following specialty licenses are available: Solar Power Systems...

55

DOE Issues Request for Proposals Seeking a Contractor to Manage...  

Broader source: Energy.gov (indexed) [DOE]

Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm...

56

DOE Issues Request for Proposals Seeking a Contractor to Manage...  

Energy Savers [EERE]

world-class scientific research and development, as well as in operations and business management; and the value added by the contractor. Significant changes from the draft RFP...

57

Department of Energy Employee Concerns Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this Order is to maintain an Employee Concerns Program at DOE, including NNSA, that encourages the free and open expression of employee concerns and provides DOE federal, contractor, and subcontractor employees with an independent avenue to raise any concern related, but not limited, to the environment, safety, health, security, quality, and management, as well as harassment, intimidation, retaliation, and discrimination.

2014-12-02T23:59:59.000Z

58

Peru modifies contractors' terms  

SciTech Connect (OSTI)

With both proved hydrocarbon reserves and daily production figures in trouble, Peru has moved to make its participation contracts more attractive to foreign contractors. To reverse this downward trend, Petroperu officials are visiting U.S. companies to explain policy changes designed to make work in Peru more attractive. Peru has instituted a cost recovery concept for contractors that can be implemented with no change in current law. This system ensures the contractor recovery of his investment and grants a profit percentage inversely proportional to production, introducing more rational incentives for private investment without affecting state participation in the long run. Contractors can also work on a service contract in which all production goes to Petroperu in exchange for a predetermined tariff per barrel. A third option to foreign contractors is work on several secondary recovery projects scheduled to be performed.

Not Available

1985-05-01T23:59:59.000Z

59

NEW - DOE O 350.3, Labor Standards Compliance, Contractor Labor Relations, and Contractor Workforce Restructuring Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To ensure that contractors pursue collective bargaining practices that promote efficiency and economy in contract operations, judicious expenditure of public funds, equitable resolution of disputes, and effective collective bargaining relationships; that contractor relations/human resources specialists achieve consultations with management and operating contractors; and that appropriate labor standards are included in DOE/NNSA contracts and subcontracts. Cancels Chapters I-III of DOE O 350.1 Chg 4. Does not cancel other directives.

60

Contractor Past Performance Information  

Office of Environmental Management (EM)

time the work under a contract or order is completed. In Section IV, it reminds the contracting officer of FAR 17.207 - Exercise of options, to consider contractor's past...

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Solar Contractor Licensing  

Broader source: Energy.gov [DOE]

Until 1994, Florida offered limited specialty licenses for residential solar hot water and pool heating, as well a general solar contractor's license. These specialty licenses have not been issued...

62

ENVIRONMENTAL HEALTH & SAFETY EMPLOYEE SAFETY ORIENTATION  

E-Print Network [OSTI]

: FS Vancouver: Ops CHEMICAL SAFETY 27265 CONTRACTOR SAFETY 23867 EARLY RETURN TO WORK 23011 EMERGENCYENVIRONMENTAL HEALTH & SAFETY EMPLOYEE SAFETY ORIENTATION SIMON FRASER UNIVERSITY ENVIRONMENTAL HEALTH & SAFETY DEPARTMENT Discovery Park - MTF 8888 University Drive Burnaby, British Columbia Canada V5

63

Directory of DOE and contractor personnel involved in non-government standards activities  

SciTech Connect (OSTI)

This document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity. Additional names were added from rosters supplied by non-Government standards bodies.

NONE

1995-08-01T23:59:59.000Z

64

Enenrgy Employees Occupational Illness Compensation Program Act (EEOICPA) Tracking System, PIA, Savannah River Operations Office  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit| Department ofNon-Road Engines,Employee AssistanceUser ManualDepartmentEnd

65

CONTRACTOR REPORT SAND927005  

E-Print Network [OSTI]

CONTRACTOR REPORT SAND92≠7005 Unlimited Release UC≠261 Fatigue of Fiberglass Wind Turbine Blade WIND TURBINE BLADE MATERIALS J.F. Mandell, R.M. Reed, D.D. Samborsky Montana State University Bozeman in wind turbine blades has been explored. Coupon testing was carried out under constant amplitude tensile

66

City of Madison- Contractor Licensing  

Broader source: Energy.gov [DOE]

Although the State of Wisconsin does not have any specific laws for contractors dealing with renewable energy, the City of Madison has issued rules for contractor licensing and equipment standards...

67

Solar and Wind Contractor Licensing  

Broader source: Energy.gov [DOE]

All solar and wind energy installations must be performed by a contractor duly licensed by and in good standing with the Louisiana Contractors Licensing Board with a classification of "Solar Energy...

68

CONTRACTOR REPORT SAND98-I617  

E-Print Network [OSTI]

CONTRACTOR REPORT SAND98-I617 Unlimited Release Tech Area 11:A History Rebecca UIlrich Ktech Corporation, a Lockheed Martin Company, for the United States Department of Energy under Contract DE-AC04-94AL laboratories #12;Issued by Sandia National Laboratories, operated for the United States Department of Energy

Fuerschbach, Phillip

69

Efficiency First - Contractor Outreach: Design & Implementation...  

Energy Savers [EERE]

Efficiency First - Contractor Outreach: Design & Implementation for Residential Retrofit Programs Efficiency First - Contractor Outreach: Design & Implementation for Residential...

70

Targeting Contractors That Target Moderate Income Homeowners  

Broader source: Energy.gov [DOE]

Provides an overview of the services provided by EGIA including business development webinars, a contractor exchange, and contractor recognition.

71

Labor Standards Compliance, Contractor Labor Relations, and Contractor Workforce Restructuring Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order ensures that DOE and NNSA management and operating and other facility management contractors pursue collective bargaining practices that promote efficiency and economy in contract operations, judicious expenditure of public funds, equitable resolution of disputes, and effective collective bargaining relationships.

2014-04-07T23:59:59.000Z

72

Contractor Past Performance Information  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth CodestheatforContactsContractContractor Issues 20116

73

Contractor Past Performance Information  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth CodestheatforContactsContractContractor Issues

74

Contractor Past Performance Information  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth CodestheatforContactsContractContractor

75

Contractor Past Performance Information  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth CodestheatforContactsContractContractor

76

Contractor Past Performance Information  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth CodestheatforContactsContractContractorMarch 2013)

77

Contractor Past Performance Information  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth CodestheatforContactsContractContractorMarch 2013)

78

Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors  

SciTech Connect (OSTI)

This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVAC companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational profile of an integrated whole house performance contracting company and identify the most significant challenges facing a traditional HVAC contractor looking to transition to a whole house performance contractor. To facilitate the discussion, IBACOS divided the business operations profile of a typical integrated whole house performance contracting company (one that performs both HVAC and shell repair/upgrade work) into seven Operational Areas with more detailed Business Functions and Work Activities falling under each high-level Operational Area. The expert panel was asked to review the operational profile or 'map' of the Business Functions. The specific Work Activities within the Business Functions identified as potential transition barriers were rated by the group relative to the value in IBACOS creating guidance ensuring a successful transition and the relative difficulty in executing.

Burdick, A.

2011-10-01T23:59:59.000Z

79

ORO Energy Employees Occupational Illness Compensation Program...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

ORO Energy Employees Occupational Illness Compensation Program(EEOICPA)PIA, Oak Ridge Operations Office ORO Energy Employees Occupational Illness Compensation Program(EEOICPA)PIA,...

80

Contractor Past Performance Information  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth CodestheatforContactsContractContractorMarch 2013) 1

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Guide to good practices for operations aspects of unique processes  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Aspects of Facility Chemistry and Unique Process, Chapter 13 of Department of Energy (DOE) Order 5480.19, ``Conduct of Operations Requirements for DOE Facilities.`` The practices in this guide should be considered when planning or reviewing employee training and facility management programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19.

Not Available

1993-06-01T23:59:59.000Z

82

Worldwide pipelines and contractors directory  

SciTech Connect (OSTI)

This directory contains information on the following: pipeline contractors; US natural gas pipelines; US crude oil pipelines; US product pipelines; Canadian pipelines and foreign pipelines.

NONE

1999-11-01T23:59:59.000Z

83

Employee Handbook  

E-Print Network [OSTI]

29-30 Hotline, LBNL . . . . . . . . . . . . . . . . . . . .22, 23, 31 LBNL Employee Handbook 41 Insurance,34 42 LBNL Employee Handbook Strawberry Canyon Recreational

Bello, Madelyn

2008-01-01T23:59:59.000Z

84

Tennessee Electrical Contractor Witnesses Stabilization | Department...  

Broader source: Energy.gov (indexed) [DOE]

Tennessee Electrical Contractor Witnesses Stabilization Tennessee Electrical Contractor Witnesses Stabilization April 2, 2010 - 11:31am Addthis Joshua DeLung David Andrews of...

85

Enforcement Letter, Geiger Brothers Mechanical Contractors, INC...  

Broader source: Energy.gov (indexed) [DOE]

Geiger Brothers Mechanical Contractors, INC - March 26, 2010 Enforcement Letter, Geiger Brothers Mechanical Contractors, INC - March 26, 2010 March 26, 2010 Issued to Geiger...

86

DRAFT- DOE O 442.1B, Department of Energy Employee Concerns Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this Order is to maintain an Employee Concerns Program (ECP) at the Department of Energy (DOE), including the National Nuclear Security Administration (NNSA) that encourages the free and open expression of employee concerns and provides DOE federal, contractor, and sub contractor employees with an independent avenue to raise any concern related, but not limited, to the environment, safety, health, security, quality, and management, as well as harassment, intimidation, retaliation, and discrimination (HIRD).

87

Contractor Human Resource Management Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09

1996-09-30T23:59:59.000Z

88

Contractor Human Resource Management Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09.

1996-09-30T23:59:59.000Z

89

FLINDERS UNIVERSITY Guidelines for Contractor Safety  

E-Print Network [OSTI]

FLINDERS UNIVERSITY Guidelines for Contractor Safety INTRODUCTION............................................................................................................3 PERMITS TO WORK.........................................................................................4 SAFETY SIGNS

90

DATE: May 23, 2003 TO: ALL LBNL EMPLOYEES  

E-Print Network [OSTI]

DATE: May 23, 2003 TO: ALL LBNL EMPLOYEES SUBJECT: Employee Information for Individuals government contractor, LBNL is required to take affirmative action to hire and promote individuals may be notified. The information may also be made available to government official investigating LBNL

Knowles, David William

91

RIVACY IMPACT ASSESSMENT: SPRO Business Operations General Support  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

business purposes. The contractor collects information required to process payroll and health care administration of its employees. YES Technical, physical, and administrative...

92

Worker Protection Management for DOE Federal and Contractor Employees  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Cancels DOE 3790.1B, Except VIII; attach. 2, para. 2C, 2D(2)-(3), 2E(1)-(8), attach. 3, para. 2C, 2D(2)-(3), 2E(1)-(7), of DOE 5480.4; DOE 5480.7A; DOE 5480.8A; DOE 5480.9A; DOE 5480.10; DOE 5480.16A; DOE 5483.1A

1995-09-30T23:59:59.000Z

93

Los Alamos National Laboratory employees, Lab contractor pledge...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and...

94

Proposed 708 Criteria and Procedures for DOE Contractor Employee Protection  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015 | Department ofThatGrid3 ProgramIDPromoting

95

Department of Energy Honors Hanford Site Contractor for Employee  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy CooperationRequirements Matrix U.S. Department of Energy |Energy |Energy'sNEPAFutureGen

96

Employee-Focused Structure Helps Produce Upgrades for Contractor |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatementNOTElectricityofWater Demands | Department

97

Worker Protection Management for DOE Federal and Contractor Employees |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of Dept.|Sindhu Jagadamma Women @Telecom (Draft

98

Employee Accident / Incident Investigation Report Employee Name _________________________________________________________________  

E-Print Network [OSTI]

Employee Accident / Incident Investigation Report Employee Name's Title _________________________________________________________________ Date and Time of Accident accident occurred

Long, Nicholas

99

Guide to good practices for operations aspects of unique processes  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Aspects of Facility Chemistry and Unique Processes, Chapter XIII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing employee training and facility management programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Operations Aspects of Unique Processes is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for all personnel to coordinate interrelated activities affecting unique processes.

NONE

1998-12-01T23:59:59.000Z

100

CRAD, Conduct of Operations - Oak Ridge National Laboratory High...  

Broader source: Energy.gov (indexed) [DOE]

Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR CRAD, Conduct of Operations - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR February...

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

CERTIFICATE OF INSURANCE REQUIREMENTS FROM OUTSIDE CONTRACTORS/VENDORS/PERFORMERS  

E-Print Network [OSTI]

CERTIFICATE OF INSURANCE REQUIREMENTS FROM OUTSIDE CONTRACTORS/VENDORS/PERFORMERS Contractor/Vendorrd Party Contractor/Vendor/Performer ("Insured") performing duties/services/events or seeking to use

Barrash, Warren

102

Trends in Contractor Conversion Rates | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Contractor Conversion Rates Trends in Contractor Conversion Rates Better Buildings Residential Network Workforce Business Partners Peer Exchange Call Series: Trends in Contractor...

103

Contractor Rating and Feedback Systems | Department of Energy  

Energy Savers [EERE]

Contractor Rating and Feedback Systems Contractor Rating and Feedback Systems Better Buildings Residential Workforce Business Partners Peer Exchange Call Series: Contractor Rating...

104

Medical transcription services: the use of independent contractors  

E-Print Network [OSTI]

contractors or employees. These factors are generally described as being a "series of weights on a scale with the heaviness of each factor determined by the particular circumstances of a case" (Stalnaker 1993). None of these factors is universally given more... qualitative measures as opposed to quantitative measures in research is to gather data that has both depth and detail (Patton 1980). For example, in a participant in a study may be asked what part of their job they find most difficult. A quantitative study...

Reyna, Cara Joanne

2013-02-22T23:59:59.000Z

105

EM Sees Growth Across Complex in Partnering Agreements with Contractors  

Broader source: Energy.gov [DOE]

AIKEN, S.C. Ė DOE Savannah River Operations Office Manager Dave Moody views the partnering relationship between his office and liquid waste contractor Savannah River Remediation (SRR) as an opportunity to view cleanup work from each otherís point of view.

106

EMPLOYEE TRAINING GUIDE Mandatory Courses & Refresher Descriptions  

E-Print Network [OSTI]

Shipping - Designated Employees by Director Hilti - Designated Employees by Director Lockout/Refresher - Designated Employees by Director Lockout Tagout Confined Space Grounds Personnel In addition to trainings Distraction Fire Safety Lockout/Tagout Refrigeration Certification Utility Operator I&II #12;TTU Operations

Gelfond, Michael

107

EM Employees at West Valley Help Beat Goal for Food Banks  

Broader source: Energy.gov [DOE]

WEST VALLEY, N.Y. Ė EM employees and their contractor counterparts at the West Valley Demonstration Project (WVDP) have supported their local food banks for several years, and this year was no exception.

108

Strategies for Aligning Program Demand with Contractor's Seasonal...  

Energy Savers [EERE]

Aligning Program Demand with Contractor's Seasonal Fluctuations Strategies for Aligning Program Demand with Contractor's Seasonal Fluctuations Better Buildings Neighborhood Program...

109

Technical Assistance Contractor management plan. Revision 1  

SciTech Connect (OSTI)

The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

NONE

1995-08-01T23:59:59.000Z

110

Contractor Human Resource Management Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels Chapters I-III of DOE O 350.1 Chg 4

1996-09-29T23:59:59.000Z

111

Contractor Human Resource Management Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. This order cancels DOE O 3220.1A, DOE O 3220.4A, DOE O 3220.6A, and DOE O 3309.1A.

1996-09-30T23:59:59.000Z

112

Contractor  

Broader source: Energy.gov (indexed) [DOE]

BNFL, Inc. BWX Technologies, Inc. Duke Engineering & Services, Inc. Fluor Corporation Johnson Controls World Services Corporation Newport News Shipbuilding and Dry Dock Company...

113

CONTRACTOR:  

Office of Legacy Management (LM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment ofof EnergyYou areDowntown Site -MiamiYVE r.

114

Contractor Work Planning and Control Lessons Learned from DOE and International Projects  

Broader source: Energy.gov [DOE]

Slide Presentation by Bob McQuinn; URS Global Management and Operations Services; Frank McCoy and Rick Runnels; URS - Professional Solutions. Contractor Work Planning and Control-URS Lessons Learned.

115

Contractor Human Resource Management Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels DOE O 350.1 Chg 4. The Order is revised to reflect the cancellation of Chapters 1-3 due to the incorporation of these chapters into DOE Order 350.3; reflect organizational changes; delete reference to the DOE Retrospective Rating Insurance Plan, which is no longer available; remove the CRD from Chapter VII.

1996-09-30T23:59:59.000Z

116

An Eigenvalue Symmetric Matrix Contractor Milan Hladik  

E-Print Network [OSTI]

for symmetric matrices. Given a symmetric interval matrix AS and an interval approximation of its eigen- value a contractor. Cj is able to contract the domains of the variables by eliminating values that are not consistent contractors related to linear constraints [3] or to the constraint "A is positive semi-definite" [10

Paris-Sud XI, Université de

117

An Eigenvalue Symmetric Matrix Contractor Milan Hladik  

E-Print Network [OSTI]

for symmetric matrices. Given a symmetric interval matrix AS and an interval approximation of its eigen- value called a contractor. Cj is able to contract the domains of the variables by eliminating values contractors related to linear constraints [3] or to the constraint "A is positive semi-definite" [10

Kearfott, R. Baker

118

Employee Handbook  

SciTech Connect (OSTI)

Welcome to Berkeley Lab. You are joining or are already a part of a laboratory with a sterling tradition of scientific achievement, including eleven Nobel Laureates and thirteen National Medal of Science winners. No matter what job you do, you make Berkeley Lab the outstanding organization that it is. Without your hard work and dedication, we could not achieve all that we have. We value you and thank you for choosing to be part of our community. This Employee Handbook is designed to help you navigate the Lab. With over 3,000 employees, an additional 3,000 guests visiting from countries around the world, a 200-acre campus and many policies and procedures, learning all the ins and outs may seem overwhelming, especially if you're a new employee. However, even if you have been here for a while, this Handbook should be a useful reference tool. It is meant to serve as a guide, highlighting and summarizing what you need to know and informing you where you can go for more detailed information. The general information provided in this Handbook serves only as a brief description of many of the Lab's policies. Policies, procedures and information are found in the Lab's Regulations and Procedures Manual (RPM), Summary Plan Descriptions, University of California policies, and provisions of Contract 31 between the Regents of the University and the U.S. Department of Energy. In addition, specific terms and conditions for represented employees are found in applicable collective bargaining agreements. Nothing in this Handbook is intended to supplant, change or conflict with the previously mentioned documents. In addition, the information in this Handbook does not constitute a contract or a promise of continued employment and may be changed at any time by the Lab. We believe employees are happier and more productive if they know what they can expect from their organization and what their organization expects from them. The Handbook will familiarize you with the privileges, benefits, and responsibilities of being an employee at Berkeley Lab. In this organization, as in the rest of the world, circumstances are constantly changing. Policies and procedures can change at any time, so it is advisable to keep apprised of these changes by checking in frequently to the electronic version of this Employee Handbook found at www.lbl.gov/Workplace/HumanResources/EmployeeHandbook.

Bello, Madelyn

2008-09-05T23:59:59.000Z

119

Payments to Nonresident Alien Contractors (Procedures) A Nonresident alien contractor is an individual of a foreign country that performs independent  

E-Print Network [OSTI]

Payments to Nonresident Alien Contractors (Procedures) A Nonresident alien contractor please contact Personnel and Payroll Services Nonresident Alien tax specialist with the attached form performed by all nonresident alien contractors. The University is also required to deduct a 30% withholding

Dyer, Bill

120

Better Buildings: Workforce, Spotlight on Maine: Contractor Sales...  

Energy Savers [EERE]

Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy Upgrade Conversions Better Buildings: Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy...

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Interview: LaborWorks@NeighborWorks Provides Vermont Contractors...  

Broader source: Energy.gov (indexed) [DOE]

Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need It Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They...

122

Policy Flash: 2013-52 Contractor Legal Management Requirements...  

Broader source: Energy.gov (indexed) [DOE]

Flash: 2013-52 Contractor Legal Management Requirements: Final Rule Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule Questions concerning this policy...

123

Statement of Work - Optional Service Offerings for Contractor...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Work - Optional Service Offerings for Contractor-Identified Project Statement of Work - Optional Service Offerings for Contractor-Identified Project Spreadsheet features optional...

124

assessing contractor selection: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

year. The automobile industry is therefore a very emblematic sector for best practices of LCA Boyer, Edmond 12 Contractor Area induction checklist checklist 11 Oct 2007 CONTRACTOR...

125

DOE Contractor Work Force Restructuring Approval Thresholds  

Broader source: Energy.gov (indexed) [DOE]

can make decision bit must notify DOE of intent of restructuring 101-200 employees DOENNSA field office is authorized to provide approval 201-500 employees LM is authorized to...

126

Technical assistance contractor Management Plan. Final [report  

SciTech Connect (OSTI)

The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

Not Available

1993-09-01T23:59:59.000Z

127

Fifth technical contractors' conference on peat  

SciTech Connect (OSTI)

The Fifth Technical Contractors' Conference on Peat was held April 28 to 29, 1982, at Bethesda, Maryland. Thirty papers have been entered into EDB and ERA; two had been entered previously from other sources. (LTN)

Not Available

1982-01-01T23:59:59.000Z

128

Better Buildings - Concierge Programs for Contractors - They...  

Energy Savers [EERE]

How Local Ties Lead to Local Wins Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need It 4th U.S.-China Energy Efficiency Forum Documents...

129

Magazine Bestows Safety Award on EM Contractor  

Broader source: Energy.gov [DOE]

RICHLAND, Wash. Ė A woman-owned small business prime contractor to EMís Office of River Protection has been named one of Americaís safest companies for 2013 by EHS Today magazine.

130

Selling Geothermal Systems The "Average" Contractor  

E-Print Network [OSTI]

Selling Geothermal Systems #12;The "Average" Contractor · History of sales procedures · Manufacturer Driven Procedures · What makes geothermal technology any harder to sell? #12;"It's difficult to sell a geothermal system." · It should

131

Office of Inspector General audit report on Hanford Site contractors` use of site services  

SciTech Connect (OSTI)

The mission of the Department of Energy (DOE), Richland Operations Office (Richland) is to safely manage legacy wastes, develop and deploy science and technology, and provide stewardship of the Hanford Site (Site). To accomplish its mission, Richland employs five prime contractors: Fluor Daniel Hanford, Inc. (Fluor Daniel); Bechtel Hanford, Inc. (Bechtel); Battelle-Pacific Northwest National Laboratory (Battelle); Hanford Environmental Health Foundation; and BNFL, Inc. Some of these contractors, in turn, have multiple subcontractors. To operate the Site, contractors need to use numerous services, such as telecommunications, copying, and photography. Richland directed certain contractors to provide these and other services, called site services, for the benefit of all contractors and assigned responsibility for optimal utilization of these services to its Site Infrastructure Division (SID). In the past, the Office of Inspector General (OIG) audited several site services, including groundwater monitoring, protective forces, personnel security clearances, railroad services, and fleet management. These audits disclosed that the services were not always efficiently and effectively coordinated. Therefore, the objective of this audit was to examine other site services, principally those provided at least in part by Fluor Daniel, to determine if contractors were acquiring services already available.

NONE

1999-03-01T23:59:59.000Z

132

CONTRACT EMPLOYEES  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed New Substation Sites Proposed Route BTRICGEGR-N Goods PO 1 ofEmployee State Offices

133

Employee Spotlight  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployeeLos Careers

134

From: NIH Contractors Listserv [mailto:NIH-CONTRACTORS@LIST.NIH.GOV] On Behalf Of Contract Data Management Program Help Desk  

E-Print Network [OSTI]

From: NIH Contractors Listserv [mailto:NIH-CONTRACTORS@LIST.NIH.GOV] On Behalf Of Contract Data Management Program Help Desk Sent: Monday, March 04, 2013 12:19 PM To: NIH-CONTRACTORS@LIST.NIH.GOV Subject: National Institutes of Health (NIH) Sequestration Notice to Contractors Importance: High To All NIH

Ginzel, Matthew

135

Technical assistance contractor management plan: Surface and ground water  

SciTech Connect (OSTI)

This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC`s mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel.

Not Available

1994-09-01T23:59:59.000Z

136

Contractor Rating and Feedback Systems | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energyon ArmedWaste andAccessCO2Administrative Operations Contacts for3Second7.2Contractor

137

Federal Employee Health Services  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes requirements and responsibilities for occupational medical, employee assistance, and workers' compensation programs for Federal employees. Cancels DOE O 341.1.

2007-10-18T23:59:59.000Z

138

Employee Advisory Committee  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

PSC Employee Advisory Committee (PSC-EAC) Purpose A mechanism to help facilitate communication and provide a forum where employees can raise concerns and issues. The members of...

139

Employee Replacement Costs  

E-Print Network [OSTI]

Employee Replacement Costs Arindrajit Dube, Eric Freeman andproperties of employee replacement costs, using a panel2008. We establish that replacement costs are sub- stantial

Dube, Arindrajit; Freeman, Eric; Reich, Michael

2010-01-01T23:59:59.000Z

140

ORNL Check-List for Contractor Compliance with 10 CFR Part 707 -Workplace Substance Abuse Program at DOE Sites Page 1 of 4  

E-Print Network [OSTI]

/supervisor and employee training programs that meets the requirements of 10 CFR 707.6. Testing Designated Positions 13 707 from working in a TDP. 15 707.5(B)(4)(a) Notify TDPs at least 60 days in advance of testing unless the contractor is currently conducting a testing program for individuals. 16 707.5(B)(4)(b) Assure individuals

Pennycook, Steve

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DOE technical standards list: Directory of DOE and contractor personnel involved in non-government standards activities  

SciTech Connect (OSTI)

The body of this document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity, which is attached to the end of this document. Additional names were added from rosters supplied by non-Government standards bodies. The committees or governing bodies in which the person participates is listed after each name. An asterisk preceding the committee notation indicates that the person has identified himself or herself as the DOE representative on that committee. Appendices to this document are also provided to sort the information by the parent employment organization, by non-Government standards activity, and by the proper names of the non-Government standards organizations and committees. DOE employees and contractors listed in this technical standards list are those recorded as of May 1, 1999.

NONE

1999-05-01T23:59:59.000Z

142

DOE technical standards list: Directory of DOE and contractor personnel involved in non-government standards activities  

SciTech Connect (OSTI)

The body of this document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity, which is attached to the end of this document and to DOE Order 1300.2A. Additional names were added from rosters supplied by non-Government standards bodies. The committees or governing bodies in which the person participates is listed after each name. An asterisk preceding the committee notation indicates that the person has identified himself or herself as the DOE representative on that committee. Appendices to this document are also provided to sort the information by the parent employment organization, by non-Government standards activity, and by the proper names of the non-Government standards organizations and committees. DOE employees and contractors listed in this TSL are those recorded as of July 1, 1996.

NONE

1996-08-01T23:59:59.000Z

143

Statement of Work (SOW) Template (Combined EIR/ICE Support Contractor...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Statement of Work (SOW) Template (Combined EIRICE Support Contractor) Statement of Work (SOW) Template (Combined EIRICE Support Contractor) Contractor SOW Template - EIR &...

144

CONTRACTOR REPORT SAND97-3002  

E-Print Network [OSTI]

presents a detailed analysis of the results from fatigue studies of wind turbine blade composite materials are evident in the range of materials currently used in many blades. A preliminary evaluation of knockdownsCONTRACTOR REPORT SAND97-3002 Unlimited Distribution UC-1210 DOE/MSU COMPOSITE MATERIAL FATIGUE

145

CONTRACTOR ASBESTOS INFORMATION ASBESTOS MANAGEMENT AT SFU  

E-Print Network [OSTI]

CONTRACTOR ASBESTOS INFORMATION ASBESTOS MANAGEMENT AT SFU An extensive Asbestos Survey has been term Asbestos Management Program was approved by the Workers' Compensation Board of British Columbia. Note: There is a possibility that ACM containing materials may not have been identified or labeled

146

PRESOLICITATION Category: A. Owner: Department of Energy, Oak Ridge National Laboratory -UT Battelle LLC (DOE Contractor), Oak Ridge National Laboratory, Bethel  

E-Print Network [OSTI]

PRESOLICITATION Category: A. Owner: Department of Energy, Oak Ridge National Laboratory - UT Battelle LLC (DOE Contractor), Oak Ridge National Laboratory, Bethel Valley Road P.O. Box 2008, Oak Ridge-Battelle), the management and operating contractor for the United States Department of Energy's Oak Ridge National

Hively, Lee M.

147

DOE's Worker-Focused Safety Program Honors Contractors Across...  

Office of Environmental Management (EM)

DOE's Worker-Focused Safety Program Honors Contractors Across EM Complex DOE's Worker-Focused Safety Program Honors Contractors Across EM Complex May 29, 2014 - 12:00pm Addthis VPP...

148

DE-AC02-76SF00515 Contractor Performance Evaluation and  

E-Print Network [OSTI]

#12;#12;DE-AC02-76SF00515 Appendix B M544 FY 2008 Contractor Performance Evaluation and Measurement Plan for Management and Operations ofthe Stanford Linear Accelerator Center 10-03-07 09:58 RCVD J

Wechsler, Risa H.

149

Office of Enterprise Assessments Operational Awareness Record...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Review of the Waste Isolation Pilot Plant Exercise Horizon-14 - December 2014. The WIPP operating contractor, Nuclear Waste Partnership LLC (NWP), conducted the Horizon-14...

150

Better Buildings Neighborhood Program Business Models Guide: Contractor/Retailer Business Models  

Broader source: Energy.gov [DOE]

Business models information focused on remodelers, HVAC (heating, ventilation, and air conditioning) contractors, home performance contractors, or retailers.

151

Protection Program Operations  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Order establishes requirements for the management and operation of the Department of Energy (DOE) Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE.

2014-10-14T23:59:59.000Z

152

Needs of Non Energy-Focused Contractors  

SciTech Connect (OSTI)

To better understand the informational needs of non energy-focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

Liaukus, C.

2012-12-01T23:59:59.000Z

153

Leighton Contractors Pty Ltd | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429Lacey, Washington:Lakeville,Leighton Contractors Pty Ltd Jump to: navigation,

154

Contractor Past Performance Information | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth CodestheatforContactsContractContractorMarch

155

Contractor Political Activity Q&A  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate EarthEnergy Contractor Performance Assessment Reporting

156

The Hanford Site Richland Operations Office Office of River Protection Office of Science  

E-Print Network [OSTI]

The Hanford Site Richland Operations Office Office of River Protection Office of Science Plateau Remediation Contractor Tank Operations Contractor Analytical Services Contractor Waste Treatment Plant (WTP;HANFORDSMALLBUSINESSCOUNCIL Richland Operations Office Sally A. Sieracki Small Business Program Manager E-mail: sally

157

CLASSIFIED EMPLOYEE RECOGNITION AWARD  

E-Print Network [OSTI]

Laurie Matsen Mark Turner 1996 CLASSIFIED EMPLOYEE RECOGNITION AWARD Nancy Blake Connie Tapp Paul Marjorie Bigelow Rachele Raia Gary A. Smith Laura Willey #12;1995 CLASSIFIED EMPLOYEE RECOGNITION AWARD Pat

Oregon, University of

158

Federal Employee Health Services  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish requirements and responsibilities for occupational medical, employee assistance, and workers' compensation programs for Federal employees. Cancels DOE 3790.1B. Canceled by DOE O 341.1A.

2003-12-01T23:59:59.000Z

159

UMTRA Project Office Federal Employee Occupational Safety and Health Program Plan. Final draft  

SciTech Connect (OSTI)

This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with the applicable requirements of DOE Order 3790.1 B and DOE Albuquerque Operations Office (AL) Order 3790.1A. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES&H) Plan (DOE, 1992), which establishes the basic programmatic ES&H requirements for all participants on the UMTRA Project. The ES&H plan is designed primarily to cover remedial action activities at UMTRA sites, and defines the ES&H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES&H program and covers only the federal employees working on the UMTRA Project.

Young, B.H.

1994-02-01T23:59:59.000Z

160

UMTRA project office federal employee occupational safety and health program plan. Revision 1  

SciTech Connect (OSTI)

This document establishes the Federal Employee Occupational Safety and Health (FEOSH) Program for the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project Office. This program will ensure compliance with applicable requirements of DOE Order 3790.1B and DOE Albuquerque Operations Office (AL) Order 3790.lA. FEOSH Program responsibilities delegated by the DOE-AL to the UMTRA Project Office by AL Order 3790.1A also are assigned. The UMTRA Project Office has developed the UMTRA Project Environmental, Safety, and Health (ES&H) Plan (DOE, 1992), which establishes the basic programmatic ES&H requirements for all participants on the UMTRA Project. The ES&H plan is designed primarily to cover remedial action activities at UMTRA sites and defines the ES&H responsibilities of both the UMTRA Project Office and its contractors. The UMTRA FEOSH Program described herein is a subset of the overall UMTRA ES&H program and covers only federal employees working on the UMTRA Project.

Not Available

1994-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Employee Performance Management System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish requirements and responsibilities for employee performance appraisals, performance-related awards, and other forms of employee recognition. This Order covers most employees at grades GS-15 and below. Cancels DOE O 331.1. Canceled by DOE O 331.1B.

1999-06-15T23:59:59.000Z

162

Finance & Operations Vice President,  

E-Print Network [OSTI]

Operations · Public Safety Educational Outreach · Safe IA Partnership (S.I.P) · Security Guard Programs Assistance Program · Employee Immigration Services · Employee Disability Services · Family Services · Compensation & Classification · Employee & Labor Relations · Employment Services · Family Issues Committee

Stanier, Charlie

163

COMPARISON OF GOVERNMENT-OWNED CONTRACTOR-OPERATED (GOCO) FACILITIES  

E-Print Network [OSTI]

and Development (R&D) X Atomic Energy Act c. Performs Special Production (Nuclear) X Stevenson-Wydler Tech. Act d, or support, on its behalf, of a Government-owned or-controlled research, development, special production Contract X FAR 16.101 a. Fixed price X FAR 16.300 b. Cost reimbursable 2. Relationship with Sponsoring

164

COMPARISON OF GOVERNMENT-OWNED CONTRACTOR-OPERATED (GOCO) FACILITIES  

E-Print Network [OSTI]

and Development (R&D) X Atomic Energy Act c. Performs Special Production (Nuclear) X Stevenson-Wydler Tech. Act d, or support, on its behalf, of a Government-owned or-controlled Uresearch, development, special production.S. Government Contract X FAR 16.101 a. Fixed price X FAR 16.300 b. Cost reimbursable 2. Relationship

165

PIA - Savannah River Site Management and Operating Contractor...  

Energy Savers [EERE]

Management System (HRMS) Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA - Advanced Test Reactor National Scientific User Facility...

166

Contractor Fee Payments - Richland Operations Office | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth CodestheatforContactsContract

167

Programs: Operating as a Prime Contractor | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Careerlumens_placard-green.epsEnergy1.pdfMarket |21,-CommitteeItems at6A photo ofofofNetwork Program

168

U. S. Department of Energy Savannah River Operations Office - Contractor  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearchScheduled System BurstLongTitanConsortiumtraining

169

Management and Operating Contractors' Subcontract Audit Coverage, IG-0885  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-Cost ProductionManagement ControlsVHTRManagement and

170

Contractor Fee Payments - Idaho Operations Office | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart GridThird Quarter Overall Contract and

171

Contractor Fee Payments - Oak Ridge Operations | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart GridThird Quarter Overall Contract andOak Ridge

172

PIA - Savannah River Site Management and Operating Contractor (HRMS) |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 The 2002OpticsPeriodical:Rocky Mountain OTC GSSofDepartment of

173

Arbitration Guidance for Management & Operating Contractors | Department of  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energyon ArmedWaste andAccess to OUO Access toEnergy 5 BTOof Energy6,

174

Audit of Management and Operating Contractor Overtime Costs, IG-0381  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3--Logistical5/08 Attendance List1-02Evaluation Report TheU.S. DEPARTMENT

175

An accounting manual for construction contractors  

E-Print Network [OSTI]

the problem of income reporting at its 1938 meting. The committee concluded that it is generally better practice to include calcu3ated profits or losses on uncompleted contracts in the current incove statement. The committee recognised that there are cases... established to cover the liability to correct any defects in nnLterials and/ar worhmanship assumed by a contractor under the terms of a contract. The amaunt of such a liability nnMt be determined fram past experience or based on the general practice oi...

Whatley, James R

1951-01-01T23:59:59.000Z

176

NCON: A tensor network contractor for MATLAB  

E-Print Network [OSTI]

A fundamental process in the implementation of any numerical tensor network algorithm is that of contracting a tensor network. In this process, a network made up of multiple tensors connected by summed indices is reduced to a single tensor or a number by evaluating the index sums. This article presents a MATLAB function ncon(), or "Network CONtractor", which accepts as its input a tensor network and a contraction sequence describing how this network may be reduced to a single tensor or number. As its output it returns that single tensor or number. The function ncon() may be obtained by downloading the source of this preprint.

Robert N. C. Pfeifer; Glen Evenbly; Sukhwinder Singh; Guifre Vidal

2014-02-05T23:59:59.000Z

177

Contractor SOW Template - ICR | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orAChief MedicalDepartmentWorking withAboutUsICR Contractor

178

EM Contractor Fee Payments | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005Department ofDOEDisability EmploymentDrain-Water00:DepartmentContractor

179

Lab contractor awards LANL Foundation $3 million  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickrinformationPostdocs space control NewsUWFive R&D awardsContractor

180

Contractor: Contract Number: Contract Type: Total Estimated  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South42.2Consolidated Edison Uranium activities on DOE facilities orContractor:

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Plug-In Electric Vehicle Handbook for Electrical Contractors (Brochure)  

SciTech Connect (OSTI)

This handbook answers basic questions about plug-in electric vehicles, charging stations, charging equipment, charging equipment installation, and training for electrical contractors.

Not Available

2012-04-01T23:59:59.000Z

182

Contractor-Specific Documentation & Information in PARS II  

Energy Savers [EERE]

notice indicating that contractor EVMS system is certified as compliant with ANSIEIA-748 of a certain date. APM EVMS Specialist EVMS Self-Assessment reports Full...

183

DOE Selects Contractor for California Energy Technology Engineering...  

Broader source: Energy.gov (indexed) [DOE]

California Energy Technology Engineering Center Cleanup DOE Selects Contractor for California Energy Technology Engineering Center Cleanup June 26, 2014 - 12:00pm Addthis Media...

184

Contractor Work Planning and Control Lessons Learned from DOE...  

Broader source: Energy.gov (indexed) [DOE]

Work Planning and Control Lessons Learned from DOE and International Projects Contractor Work Planning and Control Lessons Learned from DOE and International Projects Addthis...

185

Strategies for Building Contractor Interest in Program Participation...  

Energy Savers [EERE]

business partner peer exchange call discussed strategies for building contractor interest in program participation. Call Slides and Summary More Documents & Publications...

186

Manpower trends and training requirements for radiation protection personnel in the DOE contractor system  

SciTech Connect (OSTI)

This document reports results of a survey undertaken jointly by the Office of Nuclear Safety and the Office of Industrial Relations, US Department of Energy, with assistance from Oak Ridge Associated Universities. The purpose of the survey was twofold: (1) to determine the current status and recent trends in technician-level radiation safety manpower among DOE contractors; and (2) to document the scope of radiation safety training activities for radiation protection technicians and other workers within the DOE contractor system. Data reported here were obtained both by use of a formal written questionnaire completed by staff at 34 government-owned, contractor-operated (GOCO) nuclear facilities and through supplemental documentation obtained from contractors of training procedures and requirements. The first half of this report describes trends in radiation protection manpower and reports workforce characteristics of health physics technicians. The second half of the report describes program requirements and procedures in those facilities that conduct formal in-house training programs for their radiation protection workforces. 4 figures, 22 tables.

Trice, J.

1984-02-01T23:59:59.000Z

187

HANFORD SITE WELDING PROGRAM SUCCESSFULLY PROVIDING A SINGLE SITE FUNCTION FOR USE BY MULTIPLE CONTRACTORS  

SciTech Connect (OSTI)

The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

CANNELL GR

2009-11-19T23:59:59.000Z

188

Energy Employees' Occupational Illness Compensation Program Act...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Employees' Occupational Illness Compensation Program Act (EEOICPA) Tracking Database, INL Energy Employees' Occupational Illness Compensation Program Energy Employees'...

189

Employee Development For Supervisors  

Broader source: Energy.gov [DOE]

Registration link: Register through Employee Self Service (ESS) CHRIS SystemFor organizations not currently using the CHRIS workflow process, please follow your existing interoffice training...

190

Employee Information Employee Name Employee ID Phone Number  

E-Print Network [OSTI]

(if applicable) Date of Birth Child Date of Birth Child Date of Birth Child Date of Birth Certification I certify that I have accurately reflected the qualifying federal tax status of each dependent Classified Employees Certification of Dependency for University Benefits #12;

191

ALARA training at DOE contractor facilities  

SciTech Connect (OSTI)

ALARA training is an important element of a sound ALARA program. ALARA training at a nuclear facility needs to be conducted for all occupational workers, for radiation workers, for radiation protection technicians, and for all other employees who have ALARA responsibilities. Each of these groups needs to receive ALARA training specific to their responsibilities. This report describes how to develop this training. It also outlines what should be included in an acceptable ALARA training program.

Neeser, J.L.

1992-05-22T23:59:59.000Z

192

Page 1 of 12 CONTRACTOR NAME CONTRACT # CONTRACT  

E-Print Network [OSTI]

Page 1 of 12 CONTRACTOR NAME CONTRACT # CONTRACT START CONTRACT EXPIRE ADDRESS LINE 1 CITY STATE-3-/850/10/31/14 11-01-2011 10-31-2014 21 Griffin Road North Windsor CT 06095 Jennifer Peshka CONTRACTOR NAME CONTRACT # CONTRACT START CONTRACT EXPIRE ADDRESS LINE 1 CITY STATE ZIP CODE CONTACT NAME CDM Smith 005

Holsinger, Kent

193

OPS 9.13 Operations Aspects of Facility Chemistry and Unique Processes 8/24/98  

Broader source: Energy.gov [DOE]

The objective of this surveillance is to ensure that the contractor has provided for an effective interface between facility operations personnel and personnel responsible for operation of...

194

Federal Employee Training Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Manual provides detailed requirements to supplement DOE O 360.1B, FEDERAL EMPLOYEE TRAINING. The information in this Manual is intended to assist in improving Federal workforce performance under Department of Energy (DOE) managed Federal employee training. Cancels DOE M 360.1A-1. Canceled by DOE O 360.1C.

2001-10-11T23:59:59.000Z

195

Federal Employee Training  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To plan and establish requirements and assign responsibilities for Department of Energy (DOE) Federal employee training, education, and development (hereafter referred to as "training") under the Government Employees Training Act of 1958. Cancels DOE O 360.1A. Canceled by DOE O 360.1C.

2001-10-11T23:59:59.000Z

196

Federal Employee Training  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To plan and establish requirements and assign responsibilities for Department of Energy (DOE) Federal employee training, education, and development under the Government Employees Training Act of 1958, as amended. Cancels DOE O 360.1. Canceled by DOE O 360.1B.

1999-09-21T23:59:59.000Z

197

Federal Employee Training Manual  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Manual provides detailed requirements to supplement DOE O 360.1A, Federal Employee Training, dated 9-21-99. The information in this Manual is intended to assist in improving Federal workforce performance under Department of Energy (DOE) managed Federal employee training. Canceled by DOE M 360.1-1B.

1999-09-21T23:59:59.000Z

198

Employee Performance Management System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish requirements and responsibilities for employee performance appraisals, performance-related awards, and other forms of employee recognition. (Cancels existing provisions of DOE O 3450.1B, Incentive Awards, dated 6/23/92.) Cancels DOE O 331.1A, DOE O 3450.1B. Canceled by DOE O 331.1C

2001-03-14T23:59:59.000Z

199

Employee Performance Management System  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish requirements and responsibilities for employee performance appraisals, performance-related awards, and other forms of employee recognition. Cancels DOE O 331.1A and (2) existing provisions of DOE O 3450.1B. Cancelled by DOE O 331.1C.

2001-03-14T23:59:59.000Z

200

Rowan University Independent Contractor/Employee Use Policy Issued: 4/2006  

E-Print Network [OSTI]

a Personal Service Contract downloadable from http://www.rowan.edu/open/adminfinance/accountspayable. 3

Rusu, Adrian

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Diverse Array of Career Resources Help EM Contractor Employees Find New  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005Department ofDOEDisability Employment POCs DisabilityDistributedWork |

202

48 C.F.R. 970.0309: Whistleblower Protection of Contractor Employees |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South Valley ResponsibleSubmission |4MembershipQUARTERLY1,48,K-3331, 2010

203

10 C.F.R. 708: DOE Contractor Employee Protection Program | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment( Sample of Shipment Notice) FederalLANDFILLStatement

204

DOE Employees, Contractors Donate More than 15,500 Pounds of Food |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomenthe HouseStudents2.2at Multiple Cleanof

205

Portsmouth/Paducah Employees, Contractors Donate 17,500 Pounds of Food |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment ofOil's ImpactAppendix3EnergyMay 2015Harmless |Department of

206

Los Alamos National Laboratory employees, Lab contractor pledge record $2.3  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickrinformationPostdocsCenterCentera A B CAwards Pollutionmillion to

207

Los Alamos National Laboratory employees, Lab contractor pledge record $2.5  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickrinformationPostdocsCenterCentera A B CAwards Pollutionmillion

208

Diverse Array of Career Resources Help EM Contractor Employees Find New Work  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power SystemsResources DOE ZeroThree Biorefineries toDirectDiscover and Deliver:Response to

209

Policy Flash 2013-39 Acquisition Guide, Chapter 42.15, Contractor...  

Broader source: Energy.gov (indexed) [DOE]

9 Acquisition Guide, Chapter 42.15, Contractor Performance Information Policy Flash 2013-39 Acquisition Guide, Chapter 42.15, Contractor Performance Information Attached is Policy...

210

Contingency contractor optimization. phase 3, model description and formulation.  

SciTech Connect (OSTI)

The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

Gearhart, Jared Lee; Adair, Kristin Lynn; Jones, Katherine A.; Bandlow, Alisa; Detry, Richard Joseph; Durfee, Justin D.; Jones, Dean A.; Martin, Nathaniel; Nanco, Alan Stewart; Nozick, Linda Karen

2013-06-01T23:59:59.000Z

211

Contingency contractor optimization. Phase 3, model description and formulation.  

SciTech Connect (OSTI)

The goal of Phase 3 the OSD ATL Contingency Contractor Optimization (CCO) project is to create an engineering prototype of a tool for the contingency contractor element of total force planning during the Support for Strategic Analysis (SSA). An optimization model was developed to determine the optimal mix of military, Department of Defense (DoD) civilians, and contractors that accomplishes a set of user defined mission requirements at the lowest possible cost while honoring resource limitations and manpower use rules. An additional feature allows the model to understand the variability of the Total Force Mix when there is uncertainty in mission requirements.

Gearhart, Jared Lee; Adair, Kristin Lynn; Jones, Katherine A.; Bandlow, Alisa; Durfee, Justin D.; Jones, Dean A.; Martin, Nathaniel; Detry, Richard Joseph; Nanco, Alan Stewart; Nozick, Linda Karen [Cornell University

2013-10-01T23:59:59.000Z

212

Microsoft Word - DOE News Release - 'DOE, Contractors Gather...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ky. - The U.S. Department of Energy (DOE) and its Paducah contractors are collecting food and personal hygiene items to help restock the shelves of Paducah area service...

213

FY 2007/2008 Contractor Performance Plan, Volume 1  

SciTech Connect (OSTI)

This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.

Project Integration

2006-10-03T23:59:59.000Z

214

ORAU Wins DOE Facility Management Contractor Small Business Achievemen...  

Energy Savers [EERE]

On June 12, 2014, at the US Department of Energy's Small Business Forum in Tampa, FL, the Oak Ridge Associated Universities won the FY 2013 Facility Management Contractor Small...

215

FY 2007/2008 Contractor Performance Plan, Volume 2  

SciTech Connect (OSTI)

This Contractor Performance Plan is a detailed execution plan covering fiscal years 2007 and 2008 that implements the Integration Project Baseline in a more aggressive cost and schedule approach.

Project Integration

2006-10-03T23:59:59.000Z

216

Site: Contract Name: Contractor: Contract Number: Contract Type...  

Office of Environmental Management (EM)

EM Contractor Fee Sep-14 Portsmouth Paducah Project Office Paducah Remediation Contract LATA of Kentucky 12,231,233 Cost Plus Award Fee 403,310,497 July 2010 - July 2015...

217

FY 13 Award Fee Determination Scorecard Contractor: LATA Environmenta...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

FY 13 Award Fee Determination Scorecard Contractor: LATA Environmental Services of Kentucky, LLC Contract: DE-AC30-10CC40020 Award Period: October 1, 2012 - September 30, 2013...

218

Contractor-specific Documentation & Information in PARS II  

Broader source: Energy.gov [DOE]

DOE Office of Acquisition and Project Management established guidelines for documentation that should be available within PARS II through contractor-specific records that are not linked to any...

219

2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report  

SciTech Connect (OSTI)

This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractorís revegetation and mitigation areas on the Hanford Site.

West, W. J.; Lucas, J. G.; Gano, K. A.

2011-11-14T23:59:59.000Z

220

Independent Oversight Review, Savannah River Operations Office...  

Energy Savers [EERE]

Savannah River Operations Office - July 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 July 2013 Review of the Employee Concerns Program at the...

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Operating and Assurance Program Plan. Revision 4  

SciTech Connect (OSTI)

The LBL Operating and Assurance Program (OAP) is a management system and a set of requirements designed to maintain the level of performance necessary to achieve LBL`s programmatic and administrative objectives effectively and safely through the application of quality assurance and related conduct of operations and maintenance management principles. Implement an LBL management philosophy that supports and encourages continual improvement in performance and quality at the Laboratory. Provide an integrated approach to compliance with applicable regulatory requirements and DOE orders. The OAP is intended to meet the requirements of DOE Order 5700.6C, Quality Assurance. The Program also contains management system elements of DOE Orders 5480.19, Conduct of Operations Requirements for DOE Facilities; 5480.25, Safety of Accelerator Facilities; and 4330.4A, Maintenance Management Program, and is meant to integrate these elements into the overall LBL approach to Laboratory management. The requirements of this program apply to LBL employees and organizations, and to contractors and facility users as managed by their LBL sponsors. They are also applicable to external vendors and suppliers as specified in procurement documents and contracts.

Not Available

1994-07-01T23:59:59.000Z

222

Fermilab | FRA Contractor Assurance System (CAS) | Management...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

M8) Quality 1.0 Purpose 2.0 Roles and Responsibilities 3.0 Management System Operation 4.0 References 5.0 Processes Supporting System 6.0 Reviews, Audits and Reports Quality...

223

Slide 2 What is the Office of Employee Assistance Services? The Office of Employee Assistance Services incorporates several employee services  

E-Print Network [OSTI]

Slide 2 What is the Office of Employee Assistance Services? The Office of Employee Assistance Development Slide 3 Why does FSU have an Office of Employee Assistance Services? The Office of Employee need it. Slide 4 How can the Office of Employee Assistance Services help me? The "Employee Assistance

Weston, Ken

224

Frontline Employee Confidential Counseling  

E-Print Network [OSTI]

Frontline Employee Confidential Counseling ·Addiction ·Anxiety ·Depression ·Family Issues Resources & Referrals ·Legal ·Financial ·Child Care ·Elder Care Stress Management ·Personal Concerns ·Professional concentration. Treatments for ADHD include medication and psychological and behavioral therapies

Fraden, Seth

225

EMPLOYEE SAFETY ORIENTATION  

E-Print Network [OSTI]

Page | 0 EMPLOYEE SAFETY ORIENTATION _________________ Risk, Safety & Security 3333 University Way to be acquainted with the safety program, welcome! Risk, Safety & Security at UNBC is dynamic. With more than 3 worksite and safe work procedures which pertain to your job. The role of the Risk and Safety Office

Bolch, Tobias

226

Federal Employee Training  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Order establishes requirements and responsibilities for DOE Federal employee training in accordance with Chapter 41 of Title 5, United States Code (U.S.C.). Cancels DOE O 360.1B and DOE M 360.1-1B.

2011-07-06T23:59:59.000Z

227

Energy Employees Occupational Illness Compensation Program Act...  

Energy Savers [EERE]

Tracking Database, INL Energy Employees' Occupational Illness Compensation Program LM Records Handling System (LMRHS01) - Energy Employees Occupational Illness Compensation...

228

Enenrgy Employees Occupational Illness Compensation Program Act...  

Energy Savers [EERE]

Program Act (EEOICPA) Energy Employees' Occupational Illness Compensation Program Act (EEOICPA) Tracking Database, INL Energy Employees' Occupational Illness Compensation Program...

229

Revegetation manual for the environmental restoration contractor  

SciTech Connect (OSTI)

The purpose of this manual is to provide guidance and general guidelines for the revegetation of remediation waste sites and other disturbed areas on the Hanford Site. Specific revegetation plans will be developed using guidance from this manual. Locations, resources, and funding will dictate the specific revegetation design at each disturbed area. Disturbances have occurred to some of the ecological communities of the Hanford Site. Many of these disturbances are the result of operations of the Hanford Site, including Comprehensive Environmental Response, Compensation, and Liability Act of 1980 waste sites on small portions of the Hanford Site. There were, however, extensive disturbances to the native vegetation prior to operations of the facility. These resulted from cultivation, grazing, fire, and the introduction of exotics. Revegetation planning must take into account these early disturbances, as well as the later ones.

McLendon, T.; Redente, E.F.

1997-02-01T23:59:59.000Z

230

Contractor Sales Training | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energyon ArmedWaste andAccessCO2Administrative Operations Contacts

231

SF 2001-WLD;CONTRACTOR WELDING, CUTTING AND BRAZING  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

01-WLD (11-2012) Supersedes (4-2010) Issue CONTRACTOR WELDING, CUTTING, BRAZING P ART 1: CO NT R ACT O R' S E X PO S UR E AS S E S SM ENT Identify what welding, cutting andor...

232

DOE Human Genome Program contractor-grantee workshop  

SciTech Connect (OSTI)

This volume contains the proceedings for the DOE Human Genome Program`s Contractor-Grantee Workshop V held in Sante Fe, New Mexico January 28, February 1, 1996. Presentations were divided into sessions entitled Sequencing; Mapping; Informatics; Ethical, Legal, and Social Issues; and Infrastructure. Reports of individual projects described herein are separately indexed and abstracted for the database.

NONE

1996-01-01T23:59:59.000Z

233

Proceedings of the fuels technology contractors review meeting  

SciTech Connect (OSTI)

The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

Malone, R.D. [ed.

1993-11-01T23:59:59.000Z

234

SANDIA CONTRACTORS REPORT FATIGUE OF COMPOSITE MATERIALS AND  

E-Print Network [OSTI]

SANDIA CONTRACTORS REPORT FATIGUE OF COMPOSITE MATERIALS AND SUBSTRUCTURES FOR WIND TURBINE BLADES Abstract ThisreportpresentsthemajorfindingsoftheMontanaStateUniversityCompositeMaterialsFatigue Program from 1997 to 2001, and is intended to be used in conjunction with the DOE/MSU Composite Materials

235

On Ethics Form #1: There are two sections on this form where the vendor/contractor can list any campaign  

E-Print Network [OSTI]

On Ethics Form #1: There are two sections on this form where the vendor/contractor can list any by the vendor/contractor in the shaded box at the bottom before a notary, UNLESS the contractor has entered

Alpay, S. Pamir

236

CONTRACTOR HAZARDOUS MATERIALS INVENTORY REPORT Project Name: ORNL Y-12 Project Begin Date: Estimated Project End Date  

E-Print Network [OSTI]

CONTRACTOR HAZARDOUS MATERIALS INVENTORY REPORT Project Name: ORNL Y-12 Project Begin Date: Phone Numbers: Project Manager: Field Representative: SHEST Representative: List of Hazardous Materials: Estimated Project End Date: Contractor/Service Subcontractor Name: Contractor/Service Subcontractor Address

Pennycook, Steve

237

Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS...  

Broader source: Energy.gov (indexed) [DOE]

1 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES FOR SECTION H Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES FOR SECTION H Policy Flash - AL...

238

Policy Flash 2014-13 AL 2014-03: Allowability of Contractor Litigation...  

Broader source: Energy.gov (indexed) [DOE]

4-13 AL 2014-03: Allowability of Contractor Litigation Defense and Settlement Costs Policy Flash 2014-13 AL 2014-03: Allowability of Contractor Litigation Defense and Settlement...

239

GAO-04-148R Department of Energy: Reimbursement of Contractor...  

Broader source: Energy.gov (indexed) [DOE]

148R Department of Energy: Reimbursement of Contractor Litigation Costs GAO-04-148R Department of Energy: Reimbursement of Contractor Litigation Costs GAO-04-148R Department of...

240

DOE Technical Standards List. Directory of DOE and contractor personnel involved in non-government standards activities  

SciTech Connect (OSTI)

This is a periodic report on the level of agency participation in non-Government standards activities. This technical standards list is intended to assist US Department of Energy (DOE) management and other personnel involved in the DOE technical Standards Program by identifying those participating individuals. The body of this document contains a listing of DOE employees and DOE contractors who have submitted a Record of Non-Government Standards Activity. Additional names were added from rosters supplied by non-Government standards bodies. Appendices to this document are provided to list the information by parent employment organization, by non-Government standards activity, and by the proper names of the non-Government standards organizations and committees.

NONE

1997-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Statement of Work: Standard Service Offerings for Contractor-Identified Project  

Broader source: Energy.gov [DOE]

Excel file offers a template for a statement of work for standard service offerings for projects identified by a contractor.

242

The September 1957 Rocky Flats fire: A guide to record series of the Department of Energy and its contractors  

SciTech Connect (OSTI)

The primary purpose of this guide is to help the DOE locate and make available information relating to the 1957 Rocky Flats fire. The records are arranged into six categories: administrative and general; facilities and equipment; production and materials handling; waste management; workplace and environmental monitoring; and employee occupational exposure and health. A brief explanation of each category follows. The administrative and general section pertains to the administration of individual contractor organizations and DOE divisions at Rocky Flats. It also contains records which encompass several different subject areas and therefore can not be placed in a single category. The facilities and equipment category relates to the routine construction and maintenance of plant buildings as well as the purchase and installation of equipment. The production and materials handling records relate primarily to the inventory and production of nuclear materials and weapons components. The waste management records series found under this heading relate to the storage, handling, treatment, and disposal of radioactive, chemical or mixed materials produced or used at Rocky Flats. The records consist mostly of waste sampling and shipment records. The workplace and environmental monitoring records series found in this section pertain to monitoring of the workplace. The section also includes records that document efforts to monitor the environment outside of buildings, either onsite or offsite. Records in this category consist of sampling data and environmental impact reports. The employee occupational exposure and health section pertains to documentation relating to the health and occupational exposures of employees and visitors at Rocky Flats. Records series consist generally of dosimeter data, radiation exposure records, and medical records. Many of the records contain personal data pertaining to individual employees and may therefore be Privacy Act systems and records.

NONE

1995-07-19T23:59:59.000Z

243

Oak Ridge Reservation Volume 3. Records relating to RaLa, iodine-131, and cesium-137 at the Oak Ridge National Laboratory and the Oak Ridge Operations Office: A guide to record series of the Department of Energy and its contractors  

SciTech Connect (OSTI)

The purpose of this guide is to describe each of the documents and record series pertaining to the production, release, and disposal of radioactive barium-lanthanum (RaLa), iodine-131, and cesium-137 at the Department of Energy`s (DOE) Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee. History Associates Incorporated (HAI) prepared this guide as part of DOE`s Epidemiologic Records Inventory Project, which seeks to verify and conduct inventories of epidemiologic and health-related records at various DOE and DOE contractor sites. This introduction briefly describes the Epidemiologic Records Inventory Project and HAI`s role. It provides information on the history of the DOE-Oak Ridge Reservation (ORR), particularly ORNL. Specific attention is given to the production of RaLa and the fission products iodine-131 and cesium-137. This introduction also describes the methodologies HAI used in the selection and inventorying of documents and record series pertaining to RaLa, iodine-131, and cesium-137, and in the production of this guide. Concluding paragraphs describe the arrangement of the record series, explain the information contained in the record series descriptions, and indicate restrictions on access to the records.

NONE

1995-03-21T23:59:59.000Z

244

Employee Concerns Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployee Headcount

245

Employee Spotlight: Alessandro Cattaneo  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployeeLos

246

Employee Spotlight: Bryant Roybal  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployeeLosAli ErdemirBryant

247

Employee Spotlight: Dave Keller  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployeeLosAli

248

Employee Spotlight: Janice Lovato  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployeeLosAliJanice Lovato

249

Employee Spotlight: Jonathan Engle  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployeeLosAliJanice

250

Contractor Issues 2011 Annual Review | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate Earth CodestheatforContactsContractContractor Issues 2011

251

Contractor Performance Assessment Reporting System (CPARS) | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate EarthEnergy Contractor Performance Assessment Reporting

252

Contractor Purchasing Balanced Scorecard for FY 2012 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate EarthEnergy Contractor Performance Assessment

253

Contractor-Based Revenue Streams- Notes | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate EarthEnergy Contractor Performance

254

Policy Flash 2013-77 Contractor Performance Information | Department of  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy from Elizabeth C. P - . .Poli A.BusinessandEnergy 7 Contractor

255

ITEP Course: Greening Tribal Operations and Facilities  

Office of Energy Efficiency and Renewable Energy (EERE)

The Institute for Tribal Environmental Professionals will be offering a new course, Greening Tribal Operations and Facilities in San Diego, California, December 9 -11, 2014, for employees of...

256

Garnishment of Federal Employees' Pay  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order prescribes procedures for collecting from an employee's pay those amounts subject to legal process brought for enforcement of the employee's legal obligations to provide child support and/or make alimony payments and commercial garnishments. Cancels DOE O 2200.11. Admin Chg 1, dated 6-4-2008, cancels DOE O 323.1.

2004-08-01T23:59:59.000Z

257

Garnishment of Federal Employees' Pay  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order prescribes procedures for collecting from an employee's pay those amounts subject to legal process brought for enforcement of the employee's legal obligations to provide child support and/or make alimony payments and commercial garnishments. Cancels DOE O 2200.11.

2004-08-01T23:59:59.000Z

258

Updated July 2009 Operations Organization  

E-Print Network [OSTI]

All-Hands, Brown Bags, and COO Open-Door sessions Ongoing Conduct Operations Employee Climate SurveysOperations Strategic Plan Updated July 2009 #12;Operations Organization Chief Operating Officer deliver exceptional operational services in support of the scientific mission of Berkeley Lab. goals

Eisen, Michael

259

Operators eye closer service relationships  

SciTech Connect (OSTI)

The use of integrated drilling services and alliance-type contracts has become economical and more practicable for many operators and service companies world-wide. The alliance-type contract provides a better balance of risks and rewards shared equally among all operator and contractor parties than many standard day rate and turnkey contracts. The general trend toward longer term contracts with fewer supply companies has helped numerous operators remain competitive. The paper discusses the trend toward increased partnerships and fewer suppliers.

Deffarges, E.H.; Ellis, P.A. (Booz Allen Hamilton Inc., Paris (France)); McArthur, N.C. (Booz Allen Hamilton Inc., Wassenaar (Netherlands))

1994-09-19T23:59:59.000Z

260

EM Contractors for Capital Asset Projects | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005Department ofDOEDisabilityContractors for Capital Asset Projects EM

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

REQUEST FOR EMPLOYEE TERMINATION CLEARANCE SUPERVISOR'S RESPONSIBILITY  

E-Print Network [OSTI]

REQUEST FOR EMPLOYEE TERMINATION CLEARANCE PROCESS SUPERVISOR'S RESPONSIBILITY: Before an employeeClearance@caltech.edu. The following departments will be notified prior to the employee's termination date: ∑ Athenaeum ∑ Bursar ∑ Telecommunications ∑ Travel Audit The following departments will be notified after the employee's termination date

Faraon, Andrei

262

Track 4: Employee Health and Wellness  

Broader source: Energy.gov [DOE]

ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 4: Employee Health and Wellness

263

PROSPECTIVE EMPLOYEE BENEFIT PREVIEW PACKET  

E-Print Network [OSTI]

Weatherly Educational Assistance Insurance/Workers' Compensation 901-448-5601 901-448-5577 Dgillia4@uthsc. Exempt employees have the option to elect the TCRS or Optional Retirement Program (ORP). The ORP

Cui, Yan

264

Operations Research + Information Engineering  

E-Print Network [OSTI]

and the equipment they operate to perform most efficiently. The allocation of resources may be represented of the techniques and modeling concepts needed to analyze and design complex systems. As an operations researcher. All business systems are complex and need sophisticated decision-making methods that enable employees

Keinan, Alon

265

Cost-Effective, Customer-Focused, and Contractor-Focused Data...  

Broader source: Energy.gov (indexed) [DOE]

Data and Evaluation Peer Exchange Call Series: Cost-Effective, Customer-Focused and Contractor-Focused Data Tracking Systems, July 24, 2014, Call Slides and Discussion Summary....

266

Memo from Deputy Secretary Poneman to DOE Contractor or Financial Assistance Recipient  

Broader source: Energy.gov [DOE]

The memo from the Deputy Secretary Poneman provides the DOE Contractor or Financial Assistance recipients with timely and clear information about the budget cuts.

267

Policy Flash 2013-70 Acqusition Guides 42.15 Contractor Performance...  

Office of Environmental Management (EM)

into Federal Awardee Performance and Integrity Infromation Systems (FAPIIS) Policy Flash 2013-70 Acqusition Guides 42.15 Contractor Performance Infromation and 42.16...

268

Employee Relations | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQ Contract ESPCElectricalofVoltageEmployee AssistanceEmployee

269

Environmental Program Description for the Tank Farm Contractor  

SciTech Connect (OSTI)

This Environmental Program Description has been developed in support of the Integrated Environmental, Safety, and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan. This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Description for the Tank Farm Contractor (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of five core functions. Each section of this plan describes the activities (formerly known as the Tank Waste Remediation System) of the Tank Farm Contractor (TFC) environmental organization according to the following core functions: Establish Environmental Policy and Define Work Scope; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Provide Feedback and Continuous Improvement; and Perform Work within Controls.

POWELL, P.A.

2000-04-20T23:59:59.000Z

270

Chapter 9 -Forklift Operations Forklift Operations Safety Rules  

E-Print Network [OSTI]

, or hazardous locations. 19. Operators should not put their fingers, arms, or legs between the uprights that horn, lights, brakes, tires, gas supply, hydraulic lines, etc. are in safe working condition. Employees

271

Worker Protection Management for DOE Federal and Contractor Employees Guide for use with DOE O 440.1  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This implementation guide provides general information and methodologies that DOE finds acceptable in meeting the Department's requirements defined in DOE O 440.1.

1997-07-10T23:59:59.000Z

272

Issues Pertaining to the Termination of Ms. Donna Busche, a Contractor Employee at the Waste Treatment Plant Project  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel2007 | Department7 U.S.DepartmentEnergyREVIEW Issues

273

The US Department of Energy`s prime contractor fees on subcontractor costs  

SciTech Connect (OSTI)

In Fiscal Year 1996, the Department`s prime contractors awarded $5.3 billion in subcontracts. The purpose of this audit was to determine if the Department adjusted the fee bases of prime contractors to reflect the actual effort necessary to manage the technical and administrative activities of their subcontractors.

NONE

1998-09-11T23:59:59.000Z

274

Reactor operation safety information document  

SciTech Connect (OSTI)

The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

Not Available

1990-01-01T23:59:59.000Z

275

to Employee and Organization  

E-Print Network [OSTI]

; · HRS Operations and Customer Service; · Workforce and Human Resource Planning; and, · Compensation | Strategic Plan High Level Overview of UT at Austin Workforce Issues Below are high level facts regarding the university workforce which serves as a backdrop for some of the recommendations of the strategic plan

Yang, Zong-Liang

276

Los Alamos National Laboratory employees receive Pollution Prevention...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Employees Receive Pollution Prevention Awards Los Alamos National Laboratory employees receive Pollution Prevention Awards Nearly 400 employees on 47 teams received Pollution...

277

Employee Directory | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployeeLos AlamosEmployee

278

Employee Information | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployeeLos Employee

279

Letter to Mr. Podonsky from DOE and Contractor Attorneys' Association concerning 10 CFR 851 implementation issues, May 21, 2007  

Broader source: Energy.gov [DOE]

Memorandum to Mr. Podonsky from DOE and Contractor Attorneys' Association concerning 10 CFR 851 implementation issues, May 21, 2007

280

Guide on Federal Employee Assistance Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide supplements the requirements and responsibilities specified in DOE O 341.1, Federal Employee Health Services, dated 12-1-03, and applies only to Federal employees. Canceled by DOE G 341.1-2A.

2003-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Employee Motivation in Energy Management Programs  

E-Print Network [OSTI]

Effective management of energy requires the same degree of manager/employee motivation as other management responsibilities. Basically the same factors cause managers and employees to be motivated and effective. In this discussion, we will review...

Hogeland, A. W.

1982-01-01T23:59:59.000Z

282

Travel Codes Traveler Is Employee  

E-Print Network [OSTI]

Travel Codes Traveler Is Employee: 64100-Domestic Travel 64150-Mileage 64200-International Travel Supplies & Expense Codes 71410-Office Supplies 71430-Lab/Research Supplies (dollar value of each item less Charges Equipment Codes 84320-Equipment (non-computer & peripherals) with a cost of $5,000.00 or more per

Arnold, Jonathan

283

Human Resources Tool Kit: Employee Self Service  

E-Print Network [OSTI]

Human Resources Tool Kit: Employee Self Service Overview: Employee Self Service (ESS) offers a single, secure source for individuals to manage their personal information. ESS offers two components in both eProfile and BuckeyeLink for employee-students. ESS will roll out university-wide April 30

284

Department of Energy Employee Concerns Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Establishes a Department of Energy Employee Concerns Program (ECP) that ensures employee concerns related to such issues such as the environment, safety, health, and management of DOE programs and facilities are properly addressed. Cancels DOE O 5480.29, Employee Concerns Management System, dated 1/15/93.

1999-02-01T23:59:59.000Z

285

Employee Performance Management and Recognition Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes requirements and responsibilities for the performance management program for all supervisory and non supervisory employees at grades GS 15 and below or equivalent, employees in EJ and EK pay bands IV and V in the Excepted Service, and all wage grade employees. Cancels DOE O 331.1B. Admin Chg 1, 2-16-11.

2010-10-15T23:59:59.000Z

286

Employee Self Assessment TTU Human Resources Employee Self Assessment (08/15/2013) Page 1 of 2  

E-Print Network [OSTI]

Employee Self Assessment TTU Human Resources Employee Self Assessment (08/15/2013) Page 1 of 2? #12;Employee Name R # TTU Human Resources Page 2 of 2Employee Self Assessment (08/15/2013) 7. What can

Rock, Chris

287

Microsoft Word - WBH-12-0005.docx  

Broader source: Energy.gov (indexed) [DOE]

any other government official who has responsibility for the oversight of the conduct of operations at a DOE site, the employee's employer, or any higher tier contractor,...

288

Microsoft Word - WBZ-12-0005.doc  

Broader source: Energy.gov (indexed) [DOE]

any other government official who has responsibility for the oversight of the conduct of operations at a DOE site, the employee's employer, or any higher tier contractor,...

289

UMTRA project technical assistance contractor quality assurance implementation plan  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center.

Not Available

1994-03-01T23:59:59.000Z

290

Licensee contractor and vendor inspection status report: Quarterly report, January--March 1997. Volume 21, Number 1  

SciTech Connect (OSTI)

A fundamental premise of the US Nuclear Regulatory Commission (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The Federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. Each licensee, contractor, and vendor participates in a quality verification process in compliance with requirements prescribed by the NRC`s rules and regulations (Title 10 of the Code of Federal Regulations). The NRC does inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of quality verification programs. This periodical covers the results of inspections performed by the NRC`s Special Inspection Branch, Vendor Inspection Section, that have been distributed to the inspected organizations during the period from January 1997 through March 1997.

NONE

1997-07-01T23:59:59.000Z

291

Licensee contractor and vendor inspection status report: Quarterly report, July--September 1997. Volume 21, Number 3  

SciTech Connect (OSTI)

A fundamental premise of the US Nuclear Regulatory Commission (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The Federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. Each licensee, contractor, and vendor participates in a quality verification process in compliance with requirements prescribed by the NRC`s rules and regulations (Title 10 of the Code of Federal Regulations). The NRC does inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of quality verification programs. This periodical covers the results if inspections that were performed by the NRC`s Special Inspection Branch, Vendor Inspection Section, and that were distributed to the inspected organizations during the period from July through September 1997.

NONE

1997-11-01T23:59:59.000Z

292

Licensee contractor and vendor inspection status report: Quarterly report, January--March 1996. Volume 20, Number 1  

SciTech Connect (OSTI)

A fundamental premise of the US Nuclear Regulatory Commission (NRC) licensing and inspection program is that licensees are responsible for the proper construction and safe and efficient operation of their nuclear power plants. The Federal government and nuclear industry have established a system for the inspection of commercial nuclear facilities to provide for multiple levels of inspection and verification. Each licensee, contractor, and vendor participates in a quality verification process in compliance with requirements prescribed by the NRC`s rules and regulations (Title 10 of the Code of Federal Regulations). The NRC does inspections to oversee the commercial nuclear industry to determine whether its requirements are being met by licensees and their contractors, while the major inspection effort is performed by the industry within the framework of quality verification programs. This periodical covers the results of inspections performed by the NRC`s Special Inspection Branch, Vendor Inspection Section, that have been distributed to the inspected organizations during the period from January 1996 through March 1996.

NONE

1996-05-01T23:59:59.000Z

293

Saving Money Through Employee Motivation and Participation in Energy Conservation  

E-Print Network [OSTI]

SAVING MONEY THROUGH EMPLOYEE MOTIVATION AND PARTICIPATION IN ENERGY CONSERVATION GARRY FRANCIS, ENERGY CONSERVATION TECHNOLOGIST GARRETT MANUFACTURING LIMITED REXDALE, ONTARIO, CANADA It is a particular pleasure for me to be here... is con~orned with the action taken since 1975 to conserv? energy in the operational activities of Garrett Manufacturing Limited, the Canadian subsidiary of The Garrett Corpora tion, one of the Signal Companies. For conference members not familiar...

Francis, G.

1982-01-01T23:59:59.000Z

294

Saving Money Through Employee Motivation and Participation in Energy Conservation  

E-Print Network [OSTI]

SAVING MOOEY THROUGH EMPLOYEE MOTIVATION AND PARTICIPATION IN ENERGY CONSERVATION WARD TOMLIN GARRETT MANUFACTURING LIMITED REXDALE, ONTARIO. CANADA It is a particular pleasure for me to be here with you today to take part in the Texas... taken since 1975 to conserve energy in the operational activities of Garrett Manufacturing Limited, the Canadian subsidiary of The Garrett Corporation, one of the Signal Companies. For conference members not familiar with the electronics industry...

Tomlin, W.

1980-01-01T23:59:59.000Z

295

Practical matters for defense contractors converting DoD technology to commercial markets  

E-Print Network [OSTI]

This thesis asks if and how the defense contractor can profitably transfer the technology and institutional learning obtained from DoD funded R&D to commercial markets. There are numerous examples of very successful defense ...

Ting, Carina Maria

2012-01-01T23:59:59.000Z

296

Type A Accident Investigation Report on the June 25, 1997, Contractor...  

Broader source: Energy.gov (indexed) [DOE]

contractor accident which occurred on BPAs Satsop-Aberdeen 2 and 3 230-kV transmission lines right-of-way. The responsibilities of this board have been completed with...

297

Guide to good practices for operations turnover  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Turnover, Chapter XII of Department of Energy (DOE) Order 5480.19, ``Conduct of Operations Requirements for DOE Facilities``. The practices in this guide should be considered when planning or reviewing operations turnover programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. ``Operations Turnover`` is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a formal operations turnover program to promote safe and efficient operations.

Not Available

1993-06-01T23:59:59.000Z

298

Guide to good practices for operations turnover  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Turnover, Chapter XII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities''. The practices in this guide should be considered when planning or reviewing operations turnover programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Operations Turnover'' is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a formal operations turnover program to promote safe and efficient operations.

Not Available

1993-06-01T23:59:59.000Z

299

Guide to good practices for operations turnover  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Turnover, Chapter XII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing operations turnover programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Operations Turnover is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a formal operations turnover program to promote safe and efficient operations.

NONE

1998-12-01T23:59:59.000Z

300

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomenthe HouseStudents2.2at Multipleorder suppliesArgonne National Laboratory |

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomenthe HouseStudents2.2at Multipleorder suppliesArgonne National Laboratory |Fermi

302

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomenthe HouseStudents2.2at Multipleorder suppliesArgonne National Laboratory |Fermiits

303

DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomenthe HouseStudents2.2at Multipleorder suppliesArgonne National Laboratory

304

DOE Seeks Contractor for Depleted Uranium Hexafluoride (DUF6) Operations at  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orAChiefAppropriation FYG 242.1-1of1.9MOhio and Kentucky

305

Report on Audit of Department of Energy Management and Operating Contractor Available Fees, IG-0390  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments onReply Comments of SouthernJune 6, 1996 REPLY TO ATTN

306

SPECIAL REPORT Incurred Cost Audit Coverage of Non- Management and Operating Contractors  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September2-SCORECARD-01-24-13 Page 1 of 1 ThisApril 2, 2015Incurred Cost

307

2014-02 Acquistion Letter 2014-01: Management and Operating Contractors'  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energyon ArmedWaste and Materials2014 Chief Freedom of Information20144 Smart Grid2014

308

Audit of the Contractor Incentive Program at the Nevada Operations Office,  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3--Logistical5/08 Attendance List1-02Evaluation Report TheU.S. DEPARTMENT,

309

Audit of the Contractor Incentive Program at the Nevada Operations Office, IG-0412  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustionImprovement3--Logistical5/08 Attendance List1-02Evaluation Report TheU.S. DEPARTMENT,October

310

ADMINISTRATIVE CHANGE TO NAP-25, Management and Operating Contractor Business Meals and Light Refreshment  

National Nuclear Security Administration (NNSA)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartmentStewardshipAdministration helps more than 600 kidspeoplet I s

311

SUBSIDY ENERGY EMPLOYEES TRANSIT (SEET)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromCommentsRevolving STATEMENT OF MELANIESUBSIDY ENERGY EMPLOYEES

312

Employee SelfService (ESS) Time Entry Eligible employees may utilize the Employee SelfService application in myOleMiss to submit their attendances  

E-Print Network [OSTI]

1 Employee SelfService (ESS) Time Entry Eligible employees may utilize the Employee Self them that time has been submitted for their approval. If you need assistance with ESS Time Entry

Tchumper, Gregory S.

313

Improved Management of the Technical Interfaces Between the Hanford Tank Farm Operator and the Hanford Waste Treatment Plant - 13383  

SciTech Connect (OSTI)

The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two different prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2; - Development of a set of alternatives to the current baseline that involve aspects of direct feed, feed conditioning, and design changes. The One System Technical Organization has served WTP, TOC, and DOE well in managing and resolving issues at the interface. This paper describes the organizational structure used to improve the interface and several examples of technical interface issues that have been successfully addressed by the new organization. (authors)

Duncan, Garth M. [Bechtel National Inc., 2435 Stevens Center Place, Richland, Washington, 99352 (United States)] [Bechtel National Inc., 2435 Stevens Center Place, Richland, Washington, 99352 (United States); Saunders, Scott A. [Washington River Protection Solutions, P.O. Box 850, Richland, Washington, 99352 (United States)] [Washington River Protection Solutions, P.O. Box 850, Richland, Washington, 99352 (United States)

2013-07-01T23:59:59.000Z

314

FY 13 Award Fee Determination Scorecard Contractor: Swift &...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

There were no significant deficiencies but improvements are expected in work controls and conduct of operations in fiscal year 2014. Performance Based Incentives Award Fee...

315

Employee Performance Management and Recognition Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish requirements and responsibilities for the performance management program for all supervisory and non-supervisory employees at grades GS-15 and below or equivalent, employees in EJ and EK pay bands IV and V in the Excepted Service, and all wage grade employees. Admin Chg 1, dated 2-16-11. Admin Chg 2, dated 2-26-2013, cancels DOE O 331.1C Admin Chg 1. Canceled by DOE O 331.1C Chg 3.

2010-10-15T23:59:59.000Z

316

Employee Performance Management and Recognition Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish requirements and responsibilities for the performance management program for all supervisory and non-supervisory employees at grades GS-15 and below or equivalent, employees in EJ and EK pay bands IV and V in the Excepted Service, and all wage grade employees. Admin Chg 1, dated 2-16-11. Admin Chg 2, dated 2-26-2013. Admin Chg 3, dated 11-13-14 cancels Admin Chg 2.

2010-10-15T23:59:59.000Z

317

Argonne honors employees for outstanding performance | Argonne...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

honors employees for outstanding performance August 15, 2013 Tweet EmailPrint ARGONNE, Ill. (Aug. 13, 2013) -- On Thursday, Aug. 15, 2013, the UChicago Argonne, LLC, Board of...

318

Type B Accident Investigation, Subcontractor Employee Personal...  

Broader source: Energy.gov (indexed) [DOE]

ignited the right leg of his 100% cotton anticontamination (anti-c) coveralls and the plastic bootie. Type B Accident Investigation, Subcontractor Employee Personal Protective...

319

Achieving Total Employee Engagement in Energy Efficiency  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

recognized with InfoWorld Green 15 award - Named one of Uptime Institute's 2009 "Global Green 100 Environmental, Health and Safety (EHS) - Earth Day events, employee contests...

320

Energy Department Employees Recognized for Power Restoration...  

Broader source: Energy.gov (indexed) [DOE]

and commercial equipment that will save consumers money and reduce energy consumption and air pollution. "The Samuel J. Heyman Service to America Medals recognize federal employees...

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Report: Employee Recruitment and Retention  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015Department of Energy onACQUISITION ANDEMEMU.S.EMPLOYEE

322

Annual Employee Giving campaign underway  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAbout theOFFICEAmes Laboratory Site|Andrea LockwoodAndrzej19aEmployee

323

Subcontracting Practices at the Nevada Operations Office and Its Management and Operating Contractor, WR-B-96-07  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage ¬Ľof Energy Strain Rate Characterization|Energy High|Study: AlgaeU.S.

324

Management of government personal property in the hands of contractors. Handbook for contracting officers and staff  

SciTech Connect (OSTI)

This manual is divided into three parts. Part One applies to the management of Government personal property within the Department of Energy in general terms. Part Two describes the specifics of the application of personal property management techniques to On-Site Contractors. Part three applies to Off-Site Contractors. Part One introduces the field of property management. It discusses: the legal basis and requirements established by Federal Statutes and the parallel authorities and responsibilities; the related evolution of the Department of Energy; the regulation system within the Federal Government and its implementation by the Department for personal property management. The life cycle of equipment is presented and how control over personal property is maintained through an accountability system. Classifications of property and contract clauses are discussed. The relationships of contracting officers and property administrators with contractors are presented in each of the discussions as appropriate. Part One consists of only one chapter and is applicable to the management of property utilized by all types of contractors. It provides the foundation to explore in some detail the actions and interactions that occur between the Department's procurement and property personnel and those of the contractor. This exploration in depth is made in Parts Two and Three.

Not Available

1982-04-01T23:59:59.000Z

325

Occupational dose reduction at Department of Energy contractor facilities: Study of ALARA programs. Status 1990  

SciTech Connect (OSTI)

This report provides the US Department of Energy (DOE) and its contractors with information that will be useful for reducing occupational radiation doses at DOE`s nuclear facilities. In 1989 and 1990, health physicists from the Brookhaven National Laboratory`s (BNL) ALARA Center visited twelve DOE contractor facilities with annual collective dose equivalents greater than 100 person-rem (100 person-cSv). The health physicists interviewed radiological safety staff, engineers, and training personnel who were responsible for dose control. The status of ALARA practices at the major contractor facilities was compared with the requirements and recommendation in DOE Order 5480.11 ``Radiation Protection for Occupational Workers`` and PNL-6577 ``Health Physics Manual of Good Practices for Reducing Radiation Exposure to Levels that are as Low as Reasonably Achievable.`` The information and data collected are described and examples of successful practices are presented. The findings on the status of the DOE Contractor ALARA Programs are summarized and evaluated. In addition, the supplement to this report contains examples of good-practice documents associated with implementing the major elements of a formally documented ALARA program for a major DOE contractor facility.

Dionne, B.J.; Meinhold, C.B.; Khan, T.A.; Baum, J.W.

1992-08-01T23:59:59.000Z

326

Owner/contractor work structure process with integrated alignment framework  

E-Print Network [OSTI]

capital program expenditures , and to improve operational efficiency. For their capital projects, owners want the highest quality project, as fast as possible, at the lowest possible cost, with no harm to workers or the environment. To accomplish this...

Sullivan, George Ray

1996-01-01T23:59:59.000Z

327

Finance Division Employee Status Form Finance Division  

E-Print Network [OSTI]

's Date: Employee Name: Home Address: City/State: Zip/Postal Code: Work Phone Home Phone: Cell Phone Phone: Work Phone: Cell Phone: Relationship: Name (2): Address: State/Province: Zip/Postal Code: Home Phone: Work Phone: Cell Phone: Relationship: Special Notes: Department New Employee Resignation Change

Crews, Stephen

328

VCP Network State of Florida Employees  

E-Print Network [OSTI]

.You pay the wholesale price, avoiding high retail markups.And the cost of frames is the same at any, by employees.1 #12;Affordable frames Benefits include a wholesale frame allowance. If the wholesale cost exceeds the frame allowance, employees pay twice the wholesale difference. They never pay full retail

Fernandez, Eduardo

329

Employee and Organizational Development UNM Business Center  

E-Print Network [OSTI]

Employee and Organizational Development UNM Business Center Suite 1200 277-1555 http://hr.unm.edu/eod/ WWeellccoommee ttoo NNeeww EEmmppllooyyeeee OOrriieennttaattiioonn #12;Employee and Organizational Development to the mission and vision of the State's flagship institution of higher learning and one of the country's top

New Mexico, University of

330

Department of Energy Employee Concerns Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes a DOE Employee Concerns Program (ECP) to ensure that employee concerns related the environment, safety, health, and management of DOE and NNSA programs and facilities are addressed. Cancels DOE O 442.1 and DOE 5480.29

2001-06-06T23:59:59.000Z

331

Human Resource Management: Employee Compensation Guide  

E-Print Network [OSTI]

Human Resource Management: Employee Compensation Guide Risk Management *Extension Agricultural Economist, Kansas State University Agricultural Experiment Station and Cooperative Extension Service; and Extension Program Specialist III.... ?Employee Compensation and Job Satisfaction on Dairy Farms in the Northeast.? April 1999. Cornell University, RB99-02. Kansas Department of Human Resources. Kansas Wage Survey, 1996 Edition. Rosenberg, Howard. ?Labor Management Decisions.? University...

Fogleman, Sarah L.; McCorkle, Dean

2009-04-08T23:59:59.000Z

332

Employee Job Task Analysis (EJTA) PIA, Richland Operations Office |  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProvedDecember 2005DepartmentDecember 2011 EMAB MeetingInformation Center ¬ĽDepartment of

333

The use of binding arbitration for Arizona's public works disputes as viewed from the contractor's perspective  

E-Print Network [OSTI]

Buildin s and Im rovements include contractual language in their contracts requiring optional binding arbitration for claims under $100, 000. 00. DEDICATION This thesis is dedicated to the contractors who took part in the survey. Their opinions... of the Associated General Contractors of American and Mr. John K. Mangum, Esq. for their direction in helping to define the scope of this research. I would also like to thank Mr. Melvin C. Cohen, Esq. for his suggestions and advise. I am grateful to my brother...

Bluff, Michael Robert

2012-06-07T23:59:59.000Z

334

Los Alamos National Laboratory employees receive Pollution Prevention...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Pollution Prevention Awardees Los Alamos National Laboratory employees receive Pollution Prevention Awards Nearly 400 employees on 47 teams received Pollution Prevention awards for...

335

Federal Employee Occupational Safety And Health (FEOSH) Program...  

Energy Savers [EERE]

Federal Employee Occupational Safety And Health (FEOSH) Program Overview Federal Employee Occupational Safety And Health (FEOSH) Program Overview Congress established Public Law...

336

LM Records Handling System (LMRHS01) - Energy Employees Occupational...  

Broader source: Energy.gov (indexed) [DOE]

Employees Occupational Illness Compensation Program Act, Office of Legacy Management LM Records Handling System (LMRHS01) - Energy Employees Occupational Illness Compensation...

337

Former Oak Ridge Bechtel Jacobs Employee Charged with Violating...  

Broader source: Energy.gov (indexed) [DOE]

Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic Energy Act Former Oak Ridge Bechtel Jacobs Employee Charged with Violating Atomic Energy Act Department of...

338

3M's Model Rewards and Recognition Program Engages Employees...  

Broader source: Energy.gov (indexed) [DOE]

3M's Model Rewards and Recognition Program Engages Employees and Drives Energy Savings Efforts 3M's Model Rewards and Recognition Program Engages Employees and Drives Energy...

339

HQ Employee/Labor Management Relations Division (HC-33) | Department...  

Broader source: Energy.gov (indexed) [DOE]

and support services to Headquarters employees covering such areas as child care, elder care, employee assistance programs, health and wellness, career transition and programs...

340

E-Print Network 3.0 - annual operation plan Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

45 to Employee and Organization Summary: ; HRS Operations and Customer Service; Workforce and Human Resource Planning; and, Compensation... Annual HRS Internal...

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Notice of Intent to Revise Department of Energy Order 350.1, Contractor Human Resources Management Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

DOE O 350.1 establishes responsibilities, requirements, and cost allow-ability criteria for the management an oversight of contractor human resource management programs, is being revised to remove contractor requirements from Chapter IV, Compensation, Chapter V, Benefits, and Chapter VI Pensions

2012-10-19T23:59:59.000Z

342

OUHSC Office of Research Administration For ORA Use Only Independent Contractor Agreement (ICA) Cover Page ICA ID#: _________________________  

E-Print Network [OSTI]

OUHSC Office of Research Administration For ORA Use Only Independent Contractor Agreement (ICA if contractor is a business with a TIN or EIN. Purchasing Approval PURCHASING APPROVAL Required for all ) No Exempt: For Purchasing Use Only Date received in Purchasing: Purchasing Approval: Yes No Notes: By

Oklahoma, University of

343

Sponsored by the U.S. Department of Energy, the Hanford Site Prime Contractors, and the Pacific  

E-Print Network [OSTI]

Sponsored by the U.S. Department of Energy, the Hanford Site Prime Contractors, and the Pacific Northwest National Laboratory Wednesday, April 18th: Bus tours of the Hanford Site Evening "Nuclear Business Expo with DOE, Hanford Prime Contractors, PNNL, other Businesses, with representation from ports

344

Communications -Any member wishing to communicate concerns to MCC, the charter bus contractor, or the  

E-Print Network [OSTI]

contractor, or the Golden Gate Bridge ­ Highway and Transportation District, is encouraged to do so through to pay a Golden Gate Bridge toll, and can receive free parking in the UCSF Surge/Wood lots. P lease by members for Golden Gate Transit and or San Francisco MUNI service. Taxis ­Under no circumstances will MCC

Mullins, Dyche

345

Contractor Workplace Substance Abuse Program at DOE Sites (10 CFR 707)  

Broader source: Energy.gov [DOE]

This rule establishes policies, criteria, and procedures for developing and implementing programs to maintain a workplace free from the use of illegal drugs. It applies to DOE contractors performing work at sites owned or controlled by DOE and to individuals with unescorted access to the control areas of certain DOE reactors.

346

DOE Issues Draft Request for Proposals Seeking Contractor to Manage,  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South42.2Consolidated Edison5Operate Waste Isolation Pilot Plant | Department

347

Policy on Temporary Non Student Employees Policy on Temporary Non-  

E-Print Network [OSTI]

Policy on Temporary Non Student Employees 10/29/2014 Policy on Temporary Non- Student Employees I-term project, job or assignment. This policy sets forth the hiring parameters for such temporary employees. II-term project, job, or assignment. Students cannot be hired as temporary employees. III. Policy Temporary

Sridhar, Srinivas

348

Unapproved Minutes Provost Employee Communication Council Meeting  

E-Print Network [OSTI]

in calling special elections vs. concerns about appointed #12;reps, the council decided to ask resigning elections in May 2003. The Chair then brought up the issue of state classified employee evaluations

Whittle, Mark

349

JOBAID-VIEWING AN EMPLOYEE MATRIX (SUPERVISOR)  

Broader source: Energy.gov [DOE]

The purpose of this job aid is to guide†supervisor†users through the step-by-step process of viewing an employee matrix within SuccessFactors Learning.

350

[PROCESSING WEB TIME ENTRY FOR EMPLOYEES  

E-Print Network [OSTI]

2012 [PROCESSING WEB TIME ENTRY FOR EMPLOYEES] #12;Page 1 of 35 Contents Beginning the Process ....................................................................................... 33 #12;Page 2 of 35 Beginning the Process... Web Time Entry is processed through Banweb, using your

351

Promotion and resignation in employee networks  

E-Print Network [OSTI]

Enterprises have put more and more emphasis on data analysis so as to obtain effective management advices. Managers and researchers are trying to dig out the major factors that lead to employees' promotion and resignation. Most previous analyses were based on questionnaire survey, which usually consists of a small fraction of samples and contains biases caused by psychological defense. In this paper, we successfully collect a data set consisting of all the employees' work-related interactions (action network, AN for short) and online social connections (social network, SN for short) of a company, which inspires us to reveal the correlations between structural features and employees' career development, namely promotion and resignation. Through statistical analysis and prediction, we show that the structural features of both AN and SN are correlated and predictive to employees' promotion and resignation, and the AN has higher correlation and predictability. More specifically, the in-degree in AN is the most re...

Yuan, Jia; Gao, Jian; Zhang, Linyan; Wan, Xue-Song; Yu, Xiao-Jun; Zhou, Tao

2015-01-01T23:59:59.000Z

352

Guide on Federal Employee Occupational Medical Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Guide supplements the requirements and responsibilities specified in DOE O 341.1, Federal Employee Health Services, dated 12-1-03. This Guide provides preferred implementing methods and procedures. Canceled by DOE G 341.1-1A.

2003-12-01T23:59:59.000Z

353

A Total Quality Management (TQM) Approach for Energy Savings Through Employee Awareness and Building Upgrades to Improve Energy Efficiency  

E-Print Network [OSTI]

A TOTAL QUALIn' MANAGEMENT (TQM) APPROACH FOR ENERGY SAVINGS THROUGH EMPLOYEE AWARENESS AND BUILDING UPGRADES TO IMPROVE ENERGY EFFICIENCY Daniel H. Stewart, Principal Engineer, Facilities Department, Rh6oe-Poulenc. Inc., Cranbury, NJ...) approach depends on the input from the end-users, clients, employees, power companies, various consultants and site operation management. This paper discusses the energy efficiency projects that are currently in progress at Rhone Poulenc's Corporate...

Stewart, D. H.

354

Ergonomic Chair Specifications These specifications are intended to address most employees. Employees that have  

E-Print Network [OSTI]

Ergonomic Chair Specifications These specifications are intended to address most employees should consult Environmental Health & Safety if they require a special ergonomic chair. a. Any chair must

de Lijser, Peter

355

Theory versus practice in employee publications  

E-Print Network [OSTI]

THEORY VERSUS PRACTICE IN EMPLOYEE PUBLICATIONS A Thesis By Robbie Don Godwin Submitted to the Graduate School of the Agricultural and Mechanical College of Texas in Partial fulfillment of the requirements for the degree of MASTER... OF BUSINESS ADMINISTRATION August, l952 Major Subject: General Business THEORY VERSUS PRACTICE IN EMPLOYEE PUBLICATIONS A Thesis By Robbie Don Godwin Approved as to style and content by: (Chairman of Committee) ( e partment) August, 1962 PREFACE...

Godwin, Robbie Don

2012-06-07T23:59:59.000Z

356

Organizational commitment among public service employees  

E-Print Network [OSTI]

ORGANIZATIONAL COMMITMENT AMONG PUBLIC SERVICE EMPLOYEES A Thesis by BRIAN SCOTT YOUNG Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE May... 1993 Major Subject: Psychology ORGANIZATIONAL COMMITMENT AMONG PUBLIC SERVICE EMPLOYEES A Thesis by BRIAN SCOTT YOUNG Submitted to Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE Approved a...

Young, Brian Scott

2012-06-07T23:59:59.000Z

357

University Health Care Plus University of Utah Employee Health Plan Healthy U -Medicaid  

E-Print Network [OSTI]

University Health Care Plus ≠ University of Utah Employee Health Plan Healthy U - Medicaid NOTICE for Treatment, Payment and Health Care Operations The following categories describe the ways that the UUHP for the treatment activities of a health care provider. #12;Payment: We may use or disclose your personal

Tipple, Brett

358

Guide to good practices for operator aid postings  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operator Aid Postings, Chapter XVII of Department of Energy (DOE) Order 5480.19, ``Conduct of Operations Requirements for DOE Facilities.`` The practices in this guide should be considered when planning or reviewing operator aid postings. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19.

Not Available

1993-06-01T23:59:59.000Z

359

Westinghouse conduct of operations manual as a tool  

SciTech Connect (OSTI)

This presentation discusses the Westinghouse Government-Owned and Contractor-Operated (GOCO) Conduct of Operations Manual and how it compares with US Department of Energy (DOE) Order 5480.19 and with the Price Anderson Safety Guide, 10 CFR 830.310. This presentation will focus on what has been added to the requirements of the DOE order and how these items can be used as tools to create excellence in operation.

Schilperoort, D.L.; Scanlan, P.R.

1992-04-01T23:59:59.000Z

360

Guide to good practices for operator aid postings  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operator Aid Postings, Chapter XVII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities.'' The practices in this guide should be considered when planning or reviewing operator aid postings. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19.

Not Available

1993-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Guide to good practices for timely orders to operators  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Timely Orders to Operators, Chapter XV of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing Timely Orders to Operators programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Timely Orders to Operators is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for timely orders to operators to promote safe and efficient operations.

NONE

1998-12-01T23:59:59.000Z

362

Employee SelfService (ESS) Time Approval Supervisors may utilize the Employee SelfService application in myOleMiss to approve employees' attendances  

E-Print Network [OSTI]

1 Employee SelfService (ESS) Time Approval Supervisors may utilize the Employee Self/rejection. If you need assistance with ESS Time Approval, please contact the Payroll Office in Human Resources

Tchumper, Gregory S.

363

Inspection of the cost reduction incentive program at the Department of Energy`s Idaho Operations Office  

SciTech Connect (OSTI)

The purpose of this inspection was to review the economy and efficiency of Idaho`s Fiscal Year 1992 Cost Reduction Incentive Program, as well as to provide information to Departmental officials regarding any difficulties in administering these types of programs. The report is of the findings and recommendations. According to Idaho officials, their Cost Reduction Incentive Program was designed to motivate and provide incentives to management and operating contractors which would result in cost savings to the Department while increasing the efficiency and effectiveness of the contractors` operations. Idaho officials reported that over $22.5 million in costs were saved as a result of the Fiscal Year 1992 Cost Reduction Incentive Program. It was found that: (1) Idaho officials acknowledged that they did not attempt a full accounting records validation of the contractor`s submitted cost savings; (2) cost reduction incentive programs may result in conflicts of interest--contractors may defer work in order to receive an incentive fee; (3) the Department lacks written Department-wide policies and procedures--senior Procurement officials stated that the 1985 memorandum from the then-Assistant Secretary for Management and Administration was not the current policy of the Department; and (4) the Department already has the management and operating contract award fee provisions and value engineering program that can be used to provide financial rewards for contractors that operate cost effectively and efficiently.

Not Available

1994-07-07T23:59:59.000Z

364

CleanFleet. Final report: Volume 5, employee attitude assessment  

SciTech Connect (OSTI)

The experiences of couriers, operations managers, vehicle handlers (refuelers), and mechanics who drove and/or worked with alternative fuel vehicles, and the attitudes and perceptions of people with these experiences, are examined. Five alternative fuels studied in the CleanFleet project are considers& compressed natural gas, propane gas, California Phase 2 reformulated gasoline, M-85, and electricity. The three major areas of interest include comparative analysis of issues such as health, safety and vehicle performance, business issues encompassing several facets of station operations, and personal commentary and opinions about the CleanFleet project and the alterative fuels. Results of the employee attitude assessment are presented as both statistical and qualitative analysis.

NONE

1995-12-01T23:59:59.000Z

365

Proceedings of the advanced research and technology development direct utilization, instrumentation and diagnostics contractors' review meeting  

SciTech Connect (OSTI)

The 1990 Advanced Research and Technology Development (AR TD) Direct Utilization, and Instrumentation and Diagnostics Contractors Review Meeting was held September 16--18, 1990, at the Hyatt at Chatham Center in Pittsburgh, PA. The meeting was sponsored by the US Department of Energy (DOE), Office of Fossil Energy, and the Pittsburgh and Morgantown Energy Technology Centers. Each year the meeting provides a forum for the exchange of information among the DOE AR TD contractors and interested parties. This year's meeting was hosted by the Pittsburgh Energy Technology Center and was attended by 120 individuals from industry, academia, national laboratories, and other governmental agencies. Papers were presented on research addressing coal surface, science, devolatilization and combustion, ash behavior, emission controls for gases particulates, fluid bed combustion and utilization in diesels and turbines. Individual reports are processed separately for the data bases.

Geiling, D.W. (USDOE Morgantown Energy Technology Center, WV (USA)); Goldberg, P.M. (eds.) (USDOE Pittsburgh Energy Technology Center, PA (USA))

1990-01-01T23:59:59.000Z

366

Pollution prevention opportunity assessment approach, training, and technical assistance for DOE contractors. FY 1995 report  

SciTech Connect (OSTI)

The Department of Energy and its contractors are faced with environmental concerns and large waste management costs. Federal legislation and DOE Orders require sites to develop waste minimization/pollution prevention programs. In response to these requirements, the Kansas City Plant developed a pollution prevention tool called a pollution prevention opportunity assessment (PPOA). Pilot assessments resulted in the development of a graded approach to reduce the amount of effort required for activities that utilized nonhazardous and/or low-volume waste streams. The project`s objectives in FY95 were to validate DOE`s PPOA Graded Approach methodology, provide PPOA training and technical assistance to interested DOE personnel and DOE contractors, enhance the methodology with energy analysis and tools for environmental restoration activities, implement a DOE-wide PPOA database, and provide support to DOE EM-334 in the completion of a report which estimates the future potential for pollution prevention and waste minimization in the DOE complex.

Pemberton, S.

1996-02-01T23:59:59.000Z

367

Tank waste remediation system (TWRS) privatization contractor samples waste envelope D material 241-C-106  

SciTech Connect (OSTI)

This report represents the Final Analytical Report on Tank Waste Remediation System (TWRS) Privatization Contractor Samples for Waste Envelope D. All work was conducted in accordance with ''Addendum 1 of the Letter of Instruction (LOI) for TWRS Privatization Contractor Samples Addressing Waste Envelope D Materials - Revision 0, Revision 1, and Revision 2.'' (Jones 1996, Wiemers 1996a, Wiemers 1996b) Tank 241-C-1 06 (C-106) was selected by TWRS Privatization for the Part 1A Envelope D high-level waste demonstration. Twenty bottles of Tank C-106 material were collected by Westinghouse Hanford Company using a grab sampling technique and transferred to the 325 building for processing by the Pacific Northwest National Laboratory (PNNL). At the 325 building, the contents of the twenty bottles were combined into a single Initial Composite Material. This composite was subsampled for the laboratory-scale screening test and characterization testing, and the remainder was transferred to the 324 building for bench-scale preparation of the Privatization Contractor samples.

Esch, R.A.

1997-04-14T23:59:59.000Z

368

[Minor revisionposted 11/20/12 (replaces 10/6/05 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

OP 60.06: Lockout/Tagout Program DATE: November 20, 2012 PURPOSE: The purpose of this Operating of Federal Regulations, 1910.147, "The Control of Hazardous Energy (Lockout/Tagout)," and the Accident Employee - An employee whose job requires her/him to operate or use a machine or equipment under lockout

Rock, Chris

369

Guide to good practices for operator and postings  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operator Aid Postings, Chapter XVII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing operator aid postings. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Operator Aid Postings is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for controlling posted information to promote safe and efficient operations.

NONE

1998-12-01T23:59:59.000Z

370

Employee Concerns Program (ECP) - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployee HeadcountEmployee

371

Employee Policies | netl.doe.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployeeLos EmployeePolicies

372

Western Employee Presents Wind Award to Minnkota | Department...  

Broader source: Energy.gov (indexed) [DOE]

Western Employee Presents Wind Award to Minnkota Western Employee Presents Wind Award to Minnkota April 7, 2011 - 2:47pm Addthis Randy Manion Director of Renewable Energy, Western...

373

STUDENT EMPLOYEE HANDBOOK Financial Aid Services  

E-Print Network [OSTI]

(413) 545-0801 (413) 545-1722 fax seo@finaid.umass.edu www.umass.edu/umfa/seo/ Updated 2013-2014 #12 Student Employment Office Financial Aid Services 243 Whitmore Building 413.545.0801 seo@finaid.umass.edu umass.edu/umfa/seo Paychecks Payroll Procedures Human Resources Employee Service Center 325 Whitmore

Massachusetts at Amherst, University of

374

Florida State University Online New Employee Orientation  

E-Print Network [OSTI]

. Health insurance covers many forms of inpatient and outpatient care in private and public treatment: · marital and family conflicts, job stress, alcohol & drug abuse, eating disorders, financial difficulties, physical/sexual/emotional abuse, and communication problems #12;Florida State University Employee

Weston, Ken

375

Supervisor's Name ___________________________________ Employee's name _________________________________ Signature ___________________________________________ Signature ________________________________________  

E-Print Network [OSTI]

or system being worked on: Process being evaluated: M Lockout/tagout (Go to Lockout/Tagout below) M Tagout only (Go to Tagout below) M Energized work (Go to Energized Work below) A. Lockout/Tagout A1. Yes M of written lockout procedure if required. (See details on other side.) A7. Yes M No M Did the employee

Wilcock, William

376

Environmental Health and Instructional Safety Employee Safety  

E-Print Network [OSTI]

Environmental Health and Instructional Safety #12;Employee Safety Page 1 To our University an environment for students, faculty, staff, and visitors that will not adversely affect their health and safety task that is unsafe or hazardous. Environmental Health and Instructional Safety can assist departments

de Lijser, Peter

377

EMPLOYEE BENEFIT SERVICE Signature Service Oil Change  

E-Print Network [OSTI]

UNM Staff EMPLOYEE BENEFIT SERVICE Jiffy Lube Signature Service Oil Change Fast - No Appointment We change your oil with up to 5 quarts of major brand motor oil We install a new oil fi We visually inspect. ASE training programs · Jiffy Lube uses top quality products that meet or exceed vehicle warranty

New Mexico, University of

378

Renewable Energy Powers Renewable Energy Lab, Employees  

E-Print Network [OSTI]

Renewable Energy Powers Renewable Energy Lab, Employees The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) does more than just research renewable energy. It runs on it into PSC's grid. But this is the first time the lab--or any DOE lab--has drawn, or used, renewable energy

379

Workplace Violence Prevention Employee Awareness Class  

Broader source: Energy.gov [DOE]

The Office of Health, Safety, and Security has been working to organize a Workplace Violence Prevention Program that includes dealing with the Active Shooter scenario. After the Navy Yard event, HSS has been trying to accelerate the roll out. Next week we start two-a-days for the Employee Awareness class, which is the first step in the program development and roll out.

380

Employee Performance Management and Recognition Program  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order establishes requirements and responsibilities for the performance management program for all supervisory and non-supervisory employees other than those who are exempt herein or by memorandum. Admin Chg 1, dated 2-16-11, cancels DOE O 331.1C.

2010-10-15T23:59:59.000Z

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

SALARY STIPEND REQUEST FOR CSUEU EMPLOYEES  

E-Print Network [OSTI]

SALARY STIPEND REQUEST FOR CSUEU EMPLOYEES HUMAN RESOURCES Workforce Planning | One Washington Administrator--Submit completed request to Workforce Planning in Human Resources, 0046. Article 20 for Eligibility Sr. Workforce Planning Analyst Signature Phone: Date: HR: 07/01/08 #12;

Eirinaki, Magdalini

382

Guide to good practices for operations organization and administration  

SciTech Connect (OSTI)

The purpose of this Guide to Good Practices is to provide Department of Energy (DOE) contractors with information that can be used to validate and/or modify existing programs relative to Conduct of Operations. This Guide to Good Practices is part of a series of guides designed to enhance the guidelines set forth in DOE Order 5480.19, Conduct of Operations Requirements for DOE Facilities.''

Not Available

1992-12-01T23:59:59.000Z

383

Guide to good practices for timely orders to operators  

SciTech Connect (OSTI)

The purpose of this Guide to Good Practices is to provide Department of Energy (DOE) contractors with information that can be used to validate and/or modify existing programs relative to Conduct of Operations. This Guide to Good Practices is part of a series of guides designed to enhance the guidelines set forth in DOE Order 5480. 19, Conduct of Operations Requirements for DOE Facilities.'' (JDB)

Not Available

1993-03-01T23:59:59.000Z

384

Guide to good practices for operations organization and administration  

SciTech Connect (OSTI)

The purpose of this Guide to Good Practices is to provide Department of Energy (DOE) contractors with information that can be used to validate and/or modify existing programs relative to Conduct of Operations. This Guide to Good Practices is part of a series of guides designed to enhance the guidelines set forth in DOE Order 5480.19, ``Conduct of Operations Requirements for DOE Facilities.``

Not Available

1992-12-01T23:59:59.000Z

385

Guide to good practices for timely orders to operators  

SciTech Connect (OSTI)

The purpose of this Guide to Good Practices is to provide Department of Energy (DOE) contractors with information that can be used to validate and/or modify existing programs relative to Conduct of Operations. This Guide to Good Practices is part of a series of guides designed to enhance the guidelines set forth in DOE Order 5480. 19, ``Conduct of Operations Requirements for DOE Facilities.`` (JDB)

Not Available

1993-03-01T23:59:59.000Z

386

SUPERVISOR'S ACCIDENT INVESTIGATION FORM Employee's Name: Job Title  

E-Print Network [OSTI]

SUPERVISOR'S ACCIDENT INVESTIGATION FORM Employee's Name: Job Title: Time employee has been in current position? How long had employee been at work prior to injury? Accident Date: Time of Accident: AM PM Overtime: Yes No Location of Accident (Be Specific): Specific Task Being Performed at Time

Jiang, Wen

387

Congressional Record of Employment Discrimination Against LGBT Public Employees. 1994-2007.  

E-Print Network [OSTI]

Cal. 1992). Doe v. Gates. CIA agent dismissed because he wasDubbs. Defense contractor?s CIA security clearance upgradeCal. 1992). Doe v. Gates. CIA agent dismissed because he was

Sears, Brad; Mallory, Christy; Hunter, Nan D.

2009-01-01T23:59:59.000Z

388

Exit Checklist This checklist assists supervisors and employees in adhering to the College of Charleston's employee exit  

E-Print Network [OSTI]

on applicable security systems 6. Advise employee to return ID to Cougar Card Services 7. Ensure all parking of Charleston's employee exit process. Permanent employees should be made aware of this process from budget(s), bank account(s), etc. 12. Verify with Controller's Office that any travel advances

Kasman, Alex

389

To: York Non-Academic Employees From: Learning and Organizational Development and the Employee Well-Being Office  

E-Print Network [OSTI]

Memo To: York Non-Academic Employees From: Learning and Organizational Development and the Employee Well-Being Office Date: August 31, 2010 Subject: Wellness @ Work Series 2010-11 Learning and Organizational Development and the Employee Well-Being Office invite you to attend the "Wellness @ Work" series

390

UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water, Revision 2  

SciTech Connect (OSTI)

This document contains the Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. The QAIP outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QA program is designed to use monitoring, audit, and surveillance activities as management tools to ensure that UMTRA Project activities are carried out in amanner to protect public health and safety, promote the success of the UMTRA Project, and meet or exceed contract requirements.

NONE

1995-11-01T23:59:59.000Z

391

Energy Renovations: Volume 17: Insulation - A Guide for Contractors to Share with Homeowners  

SciTech Connect (OSTI)

This report was prepared by PNNL for DOE's Building America program and is intended as a guide that energy performance contractors can share with homeowners to describe various insulation options for improving the energy performance and comfort of existing homes. The report provides descriptions of many common insulation types, including their advantages and disadvantages, R-values, characteristics, and typical uses. The report also describes potentially hazardous products such as asbestos and formaldehyde and safety issues when conducting energy-efficient upgrades including radon. The guide is available for download at the DOE Building America website, www.buildingamerica.gov.

Baechler, Michael C.; Adams, Karen; Hefty, Marye G.; Gilbride, Theresa L.; Love, Pat M.

2012-05-15T23:59:59.000Z

392

Security Requirements for Remote Access to DOE and Applicable Contractor Information Technology Systems  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Notice establishes DOE policy requirements and responsibilities for remote connections to DOE and contractor information technology systems. The Notice will also ensure compliance with the requirements of DOE O 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, to protect DOE information and information technology systems commensurate with the risk and magnitude of harm that could result from their unauthorized access, use, disclosure, modification or destruction. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06. No cancellations.

2004-02-19T23:59:59.000Z

393

NEW - DOE O 350.1 Chg 5, Contractor Human Resource Management Programs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels DOE O 350.1 Chg 4. The Order is revised to reflect the cancellation of Chapters 1-3 due to the incorporation of these chapters into DOE Order 350.3; reflect organizational changes; delete reference to the DOE Retrospective Rating Insurance Plan, which is no longer available; remove the CRD from Chapter VII.

394

Contractor Workplace Substance Abuse Program at DOE Sites (10 CFR 707) |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTieCelebrate EarthEnergy Contractor Performance AssessmentDepartment

395

Contractor Human Resources | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched5 Industrial CarbonArticlesHumanJune 2008Contractor Human Resources Integrated Support

396

Statement of Work (SOW) Template (Combined EIR/ICE Support Contractor) |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomenthe House Committee on Energy andDepartmentDepartment of Energy Contractor SOW

397

Environment/Health/Safety: Sub-Contractor Construction Resource Page 2015  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsing Zirconia NanoparticlesSmartAffects theEnvironment,EH&S Sub-Contractor

398

Municipal solid waste management: A bibliography of US Department of Energy contractor reports through 1993  

SciTech Connect (OSTI)

US Department of Energy contractors continue to conduct research targeting the productive and responsible use of the more than 536,000 tons of municipal solid waste (MSW) that is generated each day in the United States. It is becoming more and more prudent to improve current methods of MSW management and to continue to search for additional cost-effective, energy-efficient means to manage our MSW resource. This bibliography is an updated version of Municipal Waste to Energy: An Annotated Bibliography of US Department of Energy Contractor Reports, by Caroline Brooks, published in 1987. Like its predecessor, this bibliography provides information about technical reports on energy from municipal waste that were prepared under grants or contracts from the US Department of Energy. The reports listed focus on energy from municipal waste technologies and energy conservation in wastewater treatment. The bibliography contains three indexes -- an author index, a subject index, and a title index. The reports are listed alphabetically in the subject areas and may appear under more than one subject. All of the reports cited in the original MSW bibliography are also included in this update. The number of copies of each report originally published varied according to anticipated public demand. However, all reports are available in either microfiche or hard copy form and may be ordered from the National Technical Information Service (NTIS), US Department of Commerce, Springfield, VA 22161. Explicit information on ordering reports is included in Appendix A.

Shepherd, P.

1994-07-01T23:59:59.000Z

399

Evaluation of exposures of hospital employees to anesthetic gases  

SciTech Connect (OSTI)

Hospital employees who work in hospital operating and recovery rooms are often exposed to a number of anesthetic gases. There is evidence to support the belief that such exposures have led to higher rates of miscarriages and spontaneous abortions of pregnancies among women directly exposed to these gases than among women not exposed. Most of the studies assessing exposure levels were conducted prior to the widespread use of scavenging systems. Air sampling was conducted in hospital operatories and recovery rooms of three large hospitals to assess the current exposure levels in these areas and determine the effectiveness of these systems in reducing exposures to fluoride-containing anesthetic gases. It was determined that recovery-room personnel are exposed to levels of anesthesia gases that often approach and exceed the recommended Threshold Limit Value-Time Weighted Average (TLV-TWA) of 2.0 ppm. Recovery-room personnel do not have the protection from exposure provided by scavenging systems in operating rooms. Operating-room personnel were exposed to anesthesia gas levels above the TLV-TWA only when patients were masked, or connected and disconnected from the scavenging systems. Recovery-room personnel also need to be protected from exposure to anesthesia gases by a scavenging system.

Lambeth, J.D.

1988-01-01T23:59:59.000Z

400

Analysis of the Employee Performance Evaluation System  

E-Print Network [OSTI]

Appendix A: Company Employee Evaluation Forms - Exhibit A1: Aegon Financial Partners (AFP) IT, Individual Performance Appraisal for Non Managers - Exhibit A2: Aegon Financial Partners (AFP) IT, Individual Performance Appraisal... for Managers - Exhibit A3: Commerce Bank, Performance Appraisal and Plan - Exhibit A4: Federal Aviation Administration, Project Management Office, Small Airplane Directorate Performance Review - Exhibit A5: Sprint Corporation, ?LiNK? for Exempt...

Mercado, Albert

2005-07-29T23:59:59.000Z

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Identifying at-risk employees: A behavioral model for predicting potential insider threats  

SciTech Connect (OSTI)

A psychosocial model was developed to assess an employeeís behavior associated with an increased risk of insider abuse. The model is based on case studies and research literature on factors/correlates associated with precursor behavioral manifestations of individuals committing insider crimes. In many of these crimes, managers and other coworkers observed that the offenders had exhibited signs of stress, disgruntlement, or other issues, but no alarms were raised. Barriers to using such psychosocial indicators include the inability to recognize the signs and the failure to record the behaviors so that they could be assessed by a person experienced in psychosocial evaluations. We have developed a model using a Bayesian belief network with the help of human resources staff, experienced in evaluating behaviors in staff. We conducted an experiment to assess its agreement with human resources and management professionals, with positive results. If implemented in an operational setting, the model would be part of a set of management tools for employee assessment that can raise an alarm about employees who pose higher insider threat risks. In separate work, we combine this psychosocial modelís assessment with computer workstation behavior to raise the efficacy of recognizing an insider crime in the making.

Greitzer, Frank L.; Kangas, Lars J.; Noonan, Christine F.; Dalton, Angela C.

2010-09-01T23:59:59.000Z

402

Operational Awareness Oversight of the Portsmouth/Paducah Project Office Performance of the Contractor Assurance System Program, April 2013  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L d F SSales LLCDiesel Engines |Open SourcefHSS Independent Activity

403

Occurrence reporting and processing of operations information  

SciTech Connect (OSTI)

DOE O 232.1A, Occurrence Reporting and Processing of Operations Information, and 10 CFR 830.350, Occurrence Reporting and Processing of Operations Information (when it becomes effective), along with this manual, set forth occurrence reporting requirements for Department of Energy (DOE) Departmental Elements and contractors responsible for the management and operation of DOE-owned and -leased facilities. These requirements include categorization of occurrences related to safety, security, environment, health, or operations (``Reportable Occurrences``); DOE notification of these occurrences; and the development and submission of documented follow-up reports. This Manual provides detailed information for categorizing and reporting occurrences at DOE facilities. Information gathered by the Occurrence Reporting and processing System is used for analysis of the Department`s performance in environmental protection, safeguards and security, and safety and health of its workers and the public. This information is also used to develop lessons learned and document events that significantly impact DOE operations.

NONE

1997-07-21T23:59:59.000Z

404

Summary of the contractor information exchange meeting for improving the safety of Soviet-Designed Nuclear Power Plants, February 19, 1997  

SciTech Connect (OSTI)

This report summarizes a meeting held on February 19, 1997, in Washington, D.C. The meeting was held primarily to exchange information among the contractors involved in the U.S. Department of Energy`s efforts to improve the safety of Soviet-designed nuclear power plants. Previous meetings have been held on December 5-6, 1995, and May 22, 1996. The meetings are sponsored by the U.S. Department of Energy and coordinated by the Pacific Northwest National Laboratory. The U.S. Department of Energy works with countries to increase the level of safety at 63 Soviet-designed nuclear reactors operating in Armenia, Bulgaria, the Czech Republic, Hungary, Lithuania, Russia, Slovakia, and Ukraine. The work is implemented largely by commercial companies and individuals who provide technologies and services to the countries with Soviet-designed nuclear power plants. Attending the meeting were 71 representatives of commercial contractors, the U.S. Department of Energy, the U.S. Department of State, national laboratories, and other federal agencies. The presentations and discussions that occurred during the exchange are summarized in this report. While this report captures the general presentation and discussion points covered at the meeting, it is not a verbatim, inclusive record. To make the report useful, information presented at the meeting has been expanded to clarify issues, respond to attendees` requests, or place discussion points in a broader programmatic context. Appendixes A through F contain the meeting agenda, list of attendees, copies of presentation visuals and handouts, the Strategy Document discussed at the meeting, and a summary of attendees` post-meeting evaluation comments. As with past information exchanges, the participants found this meeting valuable and useful. In response to the participant`s requests, a fourth information exchange will be held later in 1997.

NONE

1997-04-01T23:59:59.000Z

405

PHYSICAL PLANT OPERATING POLICY AND PROCEDURE  

E-Print Network [OSTI]

in this technology. REVIEW This Physical Plant Operating Policy/Procedure (PP/OP) will be reviewed in March of each Plant. Physical Plant's intention is to provide each employee reasonable access to the technology Plant technology will be a prime consideration. Requests for non-standard products will not be approved

Gelfond, Michael

406

Page 1 of 2 An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA  

E-Print Network [OSTI]

Page 1 of 2 An Equal Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA contractor to the National Nuclear Security Administration (NNSA), anticipates a joint procurement commencing Opportunity Employer / Operated by Los Alamos National Security LLC for DOE/NNSA · no later than 4:00 PM

407

Training new operators - the first six months  

SciTech Connect (OSTI)

The Fermilab Operations Department takes about two years to train a new Operator. The Operator's introductory (Concepts) On-the-Job-Training (OJT) gives him or her an overview of the laboratory, teaches the basic facts about all the accelerators, and it also teaches the new operator the training process used for all the rest of their OJT training. The Concepts OJT takes about four to six months for most people to complete. This paper will explain how this first six months of training sets the new employee on their path to becoming a fully trained Operator.

Worthel, B.; /Fermilab

2010-04-01T23:59:59.000Z

408

Energy Renovations: Volume 14: HVAC - A Guide for Contractors to Share with Homeowners  

SciTech Connect (OSTI)

This report was prepared by PNNL for DOE's Building America program and is intended as a guide that energy performance contractors can share with homeowners to describe various energy-efficient options for heating, cooling, and ventilating existing homes. The report provides descriptions of many common and not-so-common HVAC systems, including their advantages and disadvantages, efficiency ranges and characteristics of high-performance models, typical costs, and climate considerations. The report also provides decision trees and tables of useful information for homeowners who are making decisions about adding, replacing, or upgrading existing HVAC equipment in their homes. Information regarding home energy performance assessments (audits) and combustion safety issues when replacing HVAC equipment are also provided.

Gilbride, Theresa L.; Baechler, Michael C.; Hefty, Marye G.; Hand, James R.; Love, Pat M.

2011-08-29T23:59:59.000Z

409

UMTRA project technical assistance contractor quality assurance implementation plan for surface and ground water  

SciTech Connect (OSTI)

The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP). The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. The QAIP is authorized and approved by the TAC Project Manager and QA manager. The QA program is designed to use monitoring, audit, and surveillance functions as management tools to ensure that all Project organization activities are carried out in a manner that will protect public health and safety, promote the success of the UMTRA Project and meet or exceed contract requirements.

Not Available

1994-09-01T23:59:59.000Z

410

Municipal solid waste management: A bibliography of US Department of Energy contractor report through 1994  

SciTech Connect (OSTI)

U.S. Department of Energy contractors continue to conduct research targeting the productive and responsible use of the more than 516,000 metric tons (567,000 tons) of municipal solid waste (MSW) that is generated each day in the United States. It is becoming more and more prudent to improve current methods of MSW management and to continue to search for additional cost-effective, energy-efficient means to manage our MSW resource. This bibliography provides information about technical reports on energy from municipal waste that were prepared under grants or contracts from the US DOE. The reports listed focus on energy from municipal waste technologies and energy conservation in wastewater treatment.

None

1995-09-01T23:59:59.000Z

411

Waste isolation safety assessment program. Task 4. Third contractor information meeting  

SciTech Connect (OSTI)

The Contractor Information Meeting (October 14 to 17, 1979) was part of the FY-1979 effort of Task 4 of the Waste Isolation Safety Assessment Program (WISAP): Sorption/Desorption Analysis. The objectives of this task are to: evaluate sorption/desorption measurement methods and develop a standardized measurement procedure; produce a generic data bank of nuclide-geologic interactions using a wide variety of geologic media and groundwaters; perform statistical analysis and synthesis of these data; perform validation studies to compare short-term laboratory studies to long-term in situ behavior; develop a fundamental understanding of sorption/desorption processes; produce x-ray and gamma-emitting isotopes suitable for the study of actinides at tracer concentrations; disseminate resulting information to the international technical community; and provide input data support for repository safety assessment. Conference participants included those subcontracted to WISAP Task 4, representatives and independent subcontractors to the Office of Nuclear Waste Isolation, representatives from other waste disposal programs, and experts in the area of waste/geologic media interaction. Since the meeting, WISAP has been divided into two programs: Assessment of Effectiveness of Geologic Isolation Systems (AEGIS) (modeling efforts) and Waste/Rock Interactions Technology (WRIT) (experimental work). The WRIT program encompasses the work conducted under Task 4. This report contains the information presented at the Task 4, Third Contractor Information Meeting. Technical Reports from the subcontractors, as well as Pacific Northwest Laboratory (PNL), are provided along with transcripts of the question-and-answer sessions. The agenda and abstracts of the presentations are also included. Appendix A is a list of the participants. Appendix B gives an overview of the WRIT program and details the WRIT work breakdown structure for 1980.

Not Available

1980-06-01T23:59:59.000Z

412

Open Nominations Call - Energy Department Employees, Join the...  

Broader source: Energy.gov (indexed) [DOE]

Nominations Call - Energy Department Employees, Join the Women @ Energy Series Dot Harris Dot Harris Director, Office of Economic Impact and Diversity In honor of Women's...

413

TSC all-employee meeting - January 19, 2011  

SciTech Connect (OSTI)

Annual presentation on TSC accomplishments and state of the Directorate. This information is general knowledge and intended for all employees within the Theory, Simulation and Computation Directorate.

Bishop, Alan [Los Alamos National Laboratory

2011-01-25T23:59:59.000Z

414

National Nuclear Security Administration honors Y-12 employees...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

National Nuclear Security ... National Nuclear Security Administration honors Y-12 employees Posted: September 25, 2012 - 12:55pm Joining Oder (center) to present the awards was...

415

Survey Employees to Evaluate Greenhouse Gas Emissions Profile for Commuting  

Broader source: Energy.gov [DOE]

For evaluating a greenhouse gas (GHG) profile for employee commuting, data on behavior and attitudes are best collected through an agency-wide survey.

416

Type B Accident Investigation of the Subcontractor Employee Injuries...  

Broader source: Energy.gov (indexed) [DOE]

Type B Accident Investigation of the Subcontractor Employee Injuries from a November 15, 2000, Fall Accident at the Oak Ridge National Laboratory Type B Accident Investigation of...

417

Volunteering employees, retirees recognized in June  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched Ferromagnetism inS-4500IIVasudhaSurface. |Volunteering employees, retirees recognized

418

New Employee Forms | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratory | NationalJohn CyberNeutrons used to studyThe AmesA|New Employee

419

Report: Employee Recruitment and Service Recognition  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015Department of Energy onACQUISITION ANDEMEMU.S.EMPLOYEE

420

Employee Headcount by County of Residence  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployee Headcount by County

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Employee Benefits | netl.doe.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployee Headcount by

422

Employee Concerns Program | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployee

423

Employee Concerns Program | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployeeLos Alamos Field

424

Employee Resource Groups | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployeeLos Careers Home |

425

Employee Spotlight: Ali Erdemir | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployeeLosAli Erdemir

426

Employee Spotlight: Jos√© Valdez  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and West OtherEmployeeLosAliJaniceJosé

427

Employees pledge record $2.8 million  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series toESnet4: Networking for37 East and WestLydia Finney March2012 Employee

428

Restrictions on Federal Employees Acceptance of Gifts  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalancedDepartmentRestrictions on Federal Employees Acceptance of Gifts As the

429

2014 National Small Business Contracting Summit- US Womenís Chamber of Commerce & National Association of Small Business Contractors  

Broader source: Energy.gov [DOE]

The National Association of Small Business Contractors and the U.S. Women's Chamber of Commerce present the 2014 National Small Business Federal Contracting Summit. The event will include sessions on securing a fair share of federal contracting, legal issues, trends and opportunities.

430

Contractors Walk on the Wild Side...Why? Kristin Heinemeier, Ph.D., P.E., University of California, Davis  

E-Print Network [OSTI]

Contractors Walk on the Wild Side...Why? Kristin Heinemeier, Ph.D., P.E., University of California comply with nor verify the energy efficiency measures of California's energy code (not to mention: ∑ designed a flyer to explain the energy code to potential customers, so that they understand why bids

California at Davis, University of

431

CRAD, DOE Oversight- Y-12 Enriched Uranium Operations Oxide Conversion Facility  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a DOE independent oversight assessment of the Y-12 Site Office's programs for oversight of its contractors at the Y-12 Enriched Uranium Operations Oxide Conversion Facility.

432

Completed By Employee New Employee Revision to Existing Data (changes only)  

E-Print Network [OSTI]

) Disabled Veteran Yes No Female Alien Permanent Armed Forces Service Medal Veteran Male Alien Temporary, the Middle East or North Africa. Citizenship Definitions Alien: DO NOT USE: Select "Alien-Permanent" or "Alien Temporary." Employees misidentified as "Alien" are reported as "Nonresident Alien." Alien

Amin, S. Massoud

433

HelpMe Telecom - Service Support Organization (SSO) Operating Plan  

E-Print Network [OSTI]

pace with technology changes over the years, yet with improving supplier?s systems, SSO can achieve significant improvements without having to rely on extensive system modifications. It is the process analysis aspect that provided the most insight...: Short-term Operational Improvements Long-Term Value Creation ? Hire additional contractors to clear current order backlog. ? Identify Subject-Matter-Experts (SMEs), and delegate problem resolution. ? Create robust training process...

Bhojwani, Sunil

2005-12-16T23:59:59.000Z

434

THE HANFORD WASTE FEED DELIVERY OPERATIONS RESEARCH MODEL  

SciTech Connect (OSTI)

Washington River Protection Solutions (WRPS), the Hanford tank farm contractor, is tasked with the long term planning of the cleanup mission. Cleanup plans do not explicitly reflect the mission effects associated with tank farm operating equipment failures. EnergySolutions, a subcontractor to WRPS has developed, in conjunction with WRPS tank farms staff, an Operations Research (OR) model to assess and identify areas to improve the performance of the Waste Feed Delivery Systems. This paper provides an example of how OR modeling can be used to help identify and mitigate operational risks at the Hanford tank farms.

BERRY J; GALLAHER BN

2011-01-13T23:59:59.000Z

435

DISCIPLINE AND TERMINATION POLICY Employees covered by this policy  

E-Print Network [OSTI]

DISCIPLINE AND TERMINATION POLICY Employees covered by this policy This policy applies to all non to discipline, suspend with or without pay, or terminate employees for just cause. Just cause includes to discipline or termination for just cause, the University reserves the right to demote, suspend or terminate

436

Chapter 13 Employee Health and Safety Table of Contents  

E-Print Network [OSTI]

to understand their responsibility for the safety of all persons coming into their work areas. EmployeesChapter 13 Employee Health and Safety Table of Contents 13.01 Safety Policy and Accident Reporting 13.02 Workplace Violence Policy 13.03 Hazardous Employment Injury 13.04 Safety Committees 13

Sheridan, Jennifer

437

Certification of Health Care Provider for Employee's Serious Health Condition  

E-Print Network [OSTI]

of Health Care Provider for Employee's Serious Health Condition (Family and Medical Leave Act) SECTION I health condition to submit a medical certification issued by the employee's health care provider. Please: __________________________________________________________________________________ First Middle Last SECTION III: For Completion by the HEALTH CARE PROVIDER INSTRUCTIONS to the HEALTH

Subramanian, Venkat

438

Managing County Employee Health Care Costs The Problem  

E-Print Network [OSTI]

Managing County Employee Health Care Costs The Problem If food costs increased at same rate as health care, one dozen eggs would cost $80.20! 87.5% of health-care claims are due to employees cholesterol, and inactivity. Costs include unnecessary use of health-care services: 25% of doctor visits

439

Optimal Training, Employee Preferences and Moral Statistics and Mathematics Unit  

E-Print Network [OSTI]

Optimal Training, Employee Preferences and Moral Hazard Arup Bose Statistics and Mathematics Unit Abstract We study an agency model with moral hazard, when the employer offers com- plementary training to offer training and development opportunities and given that employees are not identical, how

Bandyopadhyay, Antar

440

CERTIFICATION OF HEALTH CARE PROVIDER FOR EMPLOYEE'S PREGNANCY DISABILITY  

E-Print Network [OSTI]

CERTIFICATION OF HEALTH CARE PROVIDER FOR EMPLOYEE'S PREGNANCY DISABILITY HUMAN RESOURCES Employee this form to your medical provider. Section II must be fully completed by the health care provider Department/College name: Campus Phone: I authorize my health care provider to complete this form and provide

Eirinaki, Magdalini

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

HUMAN RESOURCES MANUAL SECTION 4: NON-STUDENT HOURLY EMPLOYEES  

E-Print Network [OSTI]

HUMAN RESOURCES MANUAL SECTION 4: NON-STUDENT HOURLY EMPLOYEES 1 | P a g e S e c t i o n 4 will be notified by the Human Resources Department as non-student hourly employees approach their employment limits is submitted to the Human Resources Department by March and October for each school term of each year

442

Hanford Site air operating permit application  

SciTech Connect (OSTI)

The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

NONE

1995-05-01T23:59:59.000Z

443

CONTRACTOR REPORT SAND952729 Unlimited Release U G A Q O D  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed New Substation Sites Proposed Route BTRICGEGR-N Goods PO 1 ofEmployee State Officesx

444

CONTRACTOR REPORT SAND97-2426 Unlimited Release UC-705 Penetration Equations  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed New Substation Sites Proposed Route BTRICGEGR-N Goods PO 1 ofEmployee State

445

32.01 Employee Complaint and Appeal Procedures Page 1 of 2 32.01 Employee Complaint and Appeal Procedures  

E-Print Network [OSTI]

32.01 Employee Complaint and Appeal Procedures Page 1 of 2 32.01 Employee Complaint and Appeal Procedures Approved February 27, 1995 (MO 44-95) Revised October 13, 1995 (MO 335-95) Revised September 26. Procedures and Responsibilities 1. The chancellor shall establish comprehensive regulations

446

Guide to good practices for shift routines and operating practices  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Shift Routines and Operating Practices, Chapter H of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities.'' The practices in this guide should be considered when planning or reviewing shift routines and operating practices. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Shift Routines and Operating Practices'' is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a high standard of professional conduct and sound operating practices to promote safe and efficient operations.

Not Available

1993-06-01T23:59:59.000Z

447

Guide to good practices for shift routines and operating practices  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Shift Routines and Operating Practices, Chapter H of Department of Energy (DOE) Order 5480.19, ``Conduct of Operations Requirements for DOE Facilities.`` The practices in this guide should be considered when planning or reviewing shift routines and operating practices. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. ``Shift Routines and Operating Practices`` is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a high standard of professional conduct and sound operating practices to promote safe and efficient operations.

Not Available

1993-06-01T23:59:59.000Z

448

Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 1  

SciTech Connect (OSTI)

On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster displays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume I covers information presented at sessions 1 through 4 on systems for the production of Co-products and industrial fuel gas, environmental projects, and components and materials. Individual papers have been processed for the Energy Data Base.

Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J. (eds.)

1987-08-01T23:59:59.000Z

449

Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 2  

SciTech Connect (OSTI)

On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster dsplays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume II covers papers presented at sessions 5 and 6 on system for the production of synthesis gas, and on system for the production of power. All papers have been processed for inclusion in the Energy Data Base.

Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J. (eds.)

1987-08-01T23:59:59.000Z

450

Annual DOE Occupational Radiation Exposure | 1974 Report  

Broader source: Energy.gov [DOE]

The Seventh Annual Report of Radiation Exposures for AEC & AEC Contractor Employees analyzes occupational radiation exposures at the Atomic Energy Commission (AEC) and its contractor employees during 1974.

451

Operating and Safety Procedure for all Radiation Devices in Rooms 1420, 2407 and 2408, Chemistry, Texas A & M  

E-Print Network [OSTI]

device. 1.5 Service personal : Individual who is not an employee of Texas A & M University whose dutiesOperating and Safety Procedure for all Radiation Devices in Rooms 1420, 2407 and 2408, Chemistry devices. 1.2 Instrument User : An employee of Texas A & M University who has been trained in the use

Meagher, Mary

452

Energy Management in Small Commercial Buildings: A Look at How HVAC Contractors Can Deliver Energy Efficiency to this Segment  

SciTech Connect (OSTI)

While buildings smaller than 50,000 sq ft account for nearly half of the energy used in US commercial buildings, energy efficiency programs to-date have primarily focused on larger buildings. Interviews with stakeholders and a review of the literature indicate interest in energy efficiency from the small commercial building sector, provided solutions are simple and low-cost. An approach to deliver energy management to small commercial buildings via HVAC contractors and preliminary demonstration findings are presented. The energy management package (EMP) developed includes five technical elements: benchmarking and analysis of monthly energy use; analysis of interval electricity data (if available), a one-hour onsite walkthrough, communication with the building owner, and checking of results. This data-driven approach tracks performance and identifies low-cost opportunities, using guidelines and worksheets for each element to streamline the delivery process and minimize the formal training required. This energy management approach is unique from, but often complementary to conventional quality maintenance or retrofit-focused programs targeting the small commercial segment. Because HVAC contractors already serve these clients, the transaction cost to market and deliver energy management services can be reduced to the order of hundreds of dollars per year. This business model, outlined briefly in this report, enables the offering to benefit the contractor and client even at the modest expected energy savings in small buildings. Results from a small-scale pilot of this approach validated that the EMP could be delivered by contractors in 4-8 hours per building per year, and that energy savings of 3-5percent are feasible through this approach.

Hult, Erin; Granderson, Jessica; Mathew, Paul

2014-07-01T23:59:59.000Z

453

Guide to good practices for operations and administration updates through required reading  

SciTech Connect (OSTI)

The purpose of this Guide to Good Practices is to provide Department of Energy (DOE) contractors with information that can be used to validate and/or modify existing programs relative to Conduct of Operations. This Guide to Good Practices is part of a series of guides designed to enhance the guidelines set forth in DOE Order 5480. 19, Conduct of Operations Requirements for DOE Facilities.'' (JDB)

Not Available

1992-12-01T23:59:59.000Z

454

Guide to good practices for operations and administration updates through required reading  

SciTech Connect (OSTI)

The purpose of this Guide to Good Practices is to provide Department of Energy (DOE) contractors with information that can be used to validate and/or modify existing programs relative to Conduct of Operations. This Guide to Good Practices is part of a series of guides designed to enhance the guidelines set forth in DOE Order 5480. 19, ``Conduct of Operations Requirements for DOE Facilities.`` (JDB)

Not Available

1992-12-01T23:59:59.000Z

455

Solicitation and Selection of Partner Projects, Technical Team Leads, and Measurement and Validation Contractors for the American Recovery and Reinvestment Act (ARRA) Funded Commercial Building Partnerships (CBP-2)  

SciTech Connect (OSTI)

In March 2010, Pacific Northwest National Laboratory (PNNL) joined two other labs receiving ARRA funding, Lawrence Berkeley National Laboratory (LBNL) and the National Renewable National Laboratory (NREL), to began weekly conference calls with the goal of coordinating a joint lab solicitation to support the ARRA-funded CBP project. Two solicitations were identified for: 1) new CBP Partners; 2) technical contractors to provide technical assistance and measurement and verification (M&V) contractors. The M&V contractors support the work by providing model reviews and conducting monitoring studies to verify building performance. This report documents the process used by the labs for the solicitations, and describes the process and outcomes for PNNL, selection of candidate Partners, technical teams, and M&V contractors.

Nesse, Ronald J.; Baechler, Michael C.; Iverson, Megan M.

2010-09-30T23:59:59.000Z

456

Accountable to beneficiaries? : the modern development enterprise & its contractors at war : lessons on accountability from Afghanistan to inform the contracting reform agenda  

E-Print Network [OSTI]

This thesis will review the most relevant existing and proposed accountability mechanisms for private development and security contractors coming out of the human rights, public administration and anti-corruption fields. ...

Gupta, Huma

2011-01-01T23:59:59.000Z

457

Solar Reflectance Index Calculation Worksheet Instructions The purpose of this calculator is to enable contractors and homeowners to quickly and accurately  

E-Print Network [OSTI]

Solar Reflectance Index Calculation Worksheet Instructions Usage: The purpose of this calculator is to enable contractors and homeowners to quickly and accurately calculate the solar reflectance product exceeds the Building Energy Efficiency Standards requirement for either the aged solar

458

Guide to good practices for operations organization and administration  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Operations Organization and Administration, Chapter I of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing operations organization and administration programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. This standard should be used in conjunction with principles of the Integrated Safety Management System as incorporated in DOE G 450.4-1, Integrated Safety Management System Guide. Operations Organization and Administration is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for well-defined standards and requirements for safe and efficient operations.

NONE

1998-12-01T23:59:59.000Z

459

2009 Voluntary Protection Programs Participants' Association (VPPPA) Presentaton: Employee Led Safety Committees  

Broader source: Energy.gov [DOE]

2009 Voluntary Protection Programs Participants' Association (VPPPA) Presentaton: Employee Led Safety Committees

460

Enterprise social networks : engaging employees and sustaining participation  

E-Print Network [OSTI]

Social relationships pervade every aspect of human life and development of social networks at work is inevitable. Enterprise social networking solutions provide a platform for employees to formally foster these professional ...

Sharma, Payal

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

The "Academy Awards" of the Energy Department Recognize Employee...  

Broader source: Energy.gov (indexed) [DOE]

good the people in the Department of Energy are." This year's awards - the so-called "Academy Awards" of the Energy Department - celebrated the work of employees from across the...

462

PROVOST EMPLOYEE COMMUNICATION COUNCIL MEETING MINUTES June 10, 2008  

E-Print Network [OSTI]

PROVOST EMPLOYEE COMMUNICATION COUNCIL MEETING MINUTES June 10, 2008 Those in attendance: Susan as a guest speaker for the recycling and going green efforts of the University. The suggestion was made

Whittle, Mark

463

2014 EMPLOYEE BENEFIT INSURANCE PLAN CONTACTS Health Insurance  

E-Print Network [OSTI]

2014 EMPLOYEE BENEFIT INSURANCE PLAN CONTACTS Health Insurance Anthem Blue Cross and Blue Shield www.anthem.com √? BlueAdvantage Point of Service Plan (HMO/POS) √? PRIME Health Plan (PPO) and Custom Plus Health Plan Phone

464

ORISE: Mosley selected as ORISE director of employee relations...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

to the ORAU Diversity Council. "Mae brings more than 30 years of employee relations and workforce development expertise to her new role at ORAU," said ORAU President and CEO Andy...

465

Type B Accident Investigation Board Report Employee Puncture...  

Broader source: Energy.gov (indexed) [DOE]

F-TRU Waste Remediation Facility at the Savannah River Site on June 14, 2010 Type B Accident Investigation Board Report Employee Puncture Wound at the F-TRU Waste Remediation...

466

Joint Institute for the Study of the Atmosphere & Ocean OPERATIONS MANUAL  

E-Print Network [OSTI]

Joint Institute for the Study of the Atmosphere & Ocean OPERATIONS MANUAL 2009-2010 Joint Institute Operations Manual Revised October 2009---mcs 2 TABLE OF CONTENTS Page I. INTRODUCTION 4 A. Organization Chart Employees 14 I. Equipment Inventory and Property Activity 14 #12;JISAO Operations Manual Revised October

Rigor, Ignatius G.

467

[Minor revisionposted 12/6/12 (replaces 10/6/10 edition)] Operating Policy and Procedure  

E-Print Network [OSTI]

of this Operating Policy/Procedure (OP) is to establish a standard procedure for controlled access, securityOP 61.07 [Minor revision≠posted 12/6/12 (replaces 10/6/10 edition)] Operating Policy and Procedure employees required to perform operational #12;December 6, 2012 Page 2 OP 61.07 checks and maintenance

Rock, Chris

468

Type B Accident Investigation of the Subcontractor Employee Injuries from a November 15, 2000, Fall Accident at the Oak Ridge National Laboratory  

Broader source: Energy.gov [DOE]

On November 15, 2000, an accident occurred at the U. S. Department of Energy (DOE) Oak Ridge National Laboratory located in Oak Ridge, Tennessee. An employee of Decon and Recovery Services of Oak Ridge, LLC (DRS), working on an Oak Ridge Operations Office (ORO) Environmental Management decommissioning and demolition project received serious injuries from a fall (approximately 13 feet) from a fixed ladder.

469

DOE Headquarters Contact Information: Employee Concerns Program...  

Energy Savers [EERE]

Max Lopez 505-844-7108 maxlopez@doeal.gov Savannah River Operations Office Shirley Johnson (Acting) Darren Parham Phone: 803-952-7646 803-952-6259 Hotline: 800-749-5991 Fax:...

470

EMPLOYEE FUEL ACCESS APPLICATION Use this application to request access for employees to use the campus service stations in conjunction with a fuel  

E-Print Network [OSTI]

EMPLOYEE FUEL ACCESS APPLICATION Use this application to request access for employees to use the campus service stations in conjunction with a fuel access device. In order to obtain fuel from for access. Employee access is not required for the U-M fleet vehicle equipped with an automated fuel device

Kirschner, Denise

471

Guide to good practices for operations and administration updates through required reading  

SciTech Connect (OSTI)

This Guide to Good Practices is written to enhance understanding of, and provide direction for, Required Reading, Chapter XIV of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing programs for updating personnel with operations and administration information through required reading. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Required Reading is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a coordinated required reading program to promote safe and efficient operations.

NONE

1998-12-01T23:59:59.000Z

472

A contractor report to the Department of Energy on environmental management baseline programs and integration opportunities (discussion draft)  

SciTech Connect (OSTI)

In July 1996, the US Department of Energy (DOE) Assistant Secretary for Environmental Management (EM) chartered a government contractor led effort to develop a suite of technically defensible, integrated alternatives which meet the EM mission. The contractor team was challenged to ``think outside-the-box`` for solutions that cross traditional site boundaries and enable the programs to get the job done at an earlier date and at a lower cost. This report documents baseline programs current plans for material disposition and presents the opportunities for additional acceleration of cleanup and cost savings. A graphical depiction of the disposition of EM-owned waste and material from current state to final disposition is shown as disposition maps in Attachments 1, 3, 5, 7, 9, and 11. These disposition maps detail the material disposition at eleven major DOE sites as planned in the current discussion draft plan, Accelerating Cleanup: Focus on 2006. Maps reflecting material disposition at additional sites will be added in the future. Opportunities to further accelerate the cleanup of DOE-EM sites and reduce the overall cost of cleanup are depicted in the alternative disposition maps shown in Attachments 2, 4, 6, 8, 10, and 12. These integration opportunities bring nation-wide resources to bear on common problems facing the DOE sites.

NONE

1997-05-01T23:59:59.000Z

473

DOE Human Genome Program: Contractor-Grantee Workshop IV, November 13--17, 1994, Santa Fe, New Mexico  

SciTech Connect (OSTI)

This volume contains the proceedings of the fourth Contractor-Grantee Workshop for the Department of Energy (DOE) Human Genome Program. Of the 204 abstracts in this book, some 200 describe the genome research of DOE-funded grantees and contractors located at the multidisciplinary centers at Lawrence Berkeley Laboratory, Lawrence Livermore National Laboratory, and Los Alamos National Laboratory; other DOE-supported laboratories; and more than 54 universities, research organizations, and companies in the United States and abroad. Included are 16 abstracts from ongoing projects in the Ethical, Legal, and Social Issues (ELSI) component, an area that continues to attract considerable attention from a wide variety of interested parties. Three abstracts summarize work in the new Microbial Genome Initiative launched this year by the Office of Health and Environmental Research (OHER) to provide genome sequence and mapping data on industrially important microorganisms and those that live under extreme conditions. Many of the projects will be discussed at plenary sessions held throughout the workshop, and all are represented in the poster sessions.

Not Available

1994-10-01T23:59:59.000Z

474

Roadmap to a Sustainable Structured Trusted Employee Program  

SciTech Connect (OSTI)

Organizations (facility, regulatory agency, or country) have a compelling interest in ensuring that individuals who occupy sensitive positions affording access to chemical biological, radiological and nuclear (CBRN) materials facilities and programs are functioning at their highest level of reliability. Human reliability and human performance relate not only to security but also focus on safety. Reliability has a logical and direct relationship to trustworthiness for the organization is placing trust in their employees to conduct themselves in a secure, safe, and dependable manner. This document focuses on providing an organization with a roadmap to implementing a successful and sustainable Structured Trusted Employee Program (STEP).

Coates, Cameron W [ORNL; Eisele, Gerhard R [ORNL

2013-08-01T23:59:59.000Z

475

Employees give to local food bank | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: TopEnergyIDIQ Contract ESPCElectricalofVoltageEmployeeEmployees give to local

476

P a g e | 1 Project Manual  

E-Print Network [OSTI]

are available to DOE employees, DOE contractors, Energy Technology Data Exchange (ETDE) representatives

477

OPERATIONS (OPS)  

Broader source: Energy.gov (indexed) [DOE]

OPS) OBJECTIVE OPS.1 The formality and discipline of operations is adequate to conduct work safely and programs are in place to maintain this formality and discipline. (CR 13)...

478

Design operators  

E-Print Network [OSTI]

Design operators is a thesis that investigates the nature and characteristics of the design process by examining the interaction of computation with architectural design. The effects of the introduction of these media in ...

Dritsas, Stylianos, 1978-

2004-01-01T23:59:59.000Z

479

Operating Costs  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

1997-03-28T23:59:59.000Z

480

CRAD, Maintenance- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor.

Note: This page contains sample records for the topic "operating contractor employees" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

CRAD, Management- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Management portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor.

482

CRAD, Engineering- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Engineering Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor.

483

CRAD, Configuration Management- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Configuration Management Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory, High Flux Isotope Reactor.

484

CRAD, Emergency Management- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Emergency Management Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor.

485

CRAD, Training- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Training Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor.

486

CRAD, Safety Basis- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Safety Basis portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor.

487

CRAD, Occupational Safety & Health- Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Occupational Safety and Health Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor.

488

Rebaselining seismic risks for resumption of Building 707 plutonium operations at the Rocky Flats Plant  

SciTech Connect (OSTI)

Natural phenomena risks have been assessed for plutonium handling facilities at the Rocky Flats Plant, based on numerous studies performed for the Department of Energy Natural Phenomena Hazards Project. The risk assessment was originally utilized in the facilities Final Safety Analysis Reports and in subsequent risk management decisions. Plutonium production operations were curtailed in 1989 in order for a new operating contractor to implement safety improvements. Since natural phenomena events dominated risks to the public, a re-assessment of these events were undertaken for resumption of plutonium operations.

Elia, F. Jr. [Stone and Webster Engineering Corp., Boston, MA (United States); Foppe, T.; Stahlnecker, E. [EG and G Rocky Flats, Inc., Golden, CO (United States)

1993-08-01T23:59:59.000Z

489

Report on the establishment and operation of the Federal Energy Regulatory Commission's Daycare Center  

SciTech Connect (OSTI)

We have completed an inspection of the Federal Energy Regulatory Commission's (FERC) Daycare Center (Center). The purpose of the inspection was to review for efficiency, economy and compliance with laws and regulations, FERC's establishment and operation of the Center. The inspection objectives were to review: (1) FERC's compliance with Federal laws and requirements of the General Services Administration and the District of Columbia; (2) the source and amount of funds for establishing and operating the Center; and (3) the organizational relationships between FERC, the Center and the contractor operating the Center.

Not Available

1991-09-16T23:59:59.000Z

490

Technology Support for Libraries Employees Working from Home Policy  

E-Print Network [OSTI]

Technology Support for Libraries Employees Working from Home Policy The Systems Department provides limited information technology support for L faculty who work at home and for staff who work campus guidelines and policies related to "mobile" computers. Systems will offer regular required

Stowell, Michael

491

STUDENT EMPLOYEE OF THE YEAR AWARD NOMINATION FORM  

E-Print Network [OSTI]

STUDENT EMPLOYEE OF THE YEAR AWARD NOMINATION FORM Nominees must be full-time, undergraduate, degree-seeking students and have at least one semester of employment as a student worker) for the University of Memphis as paid, student assistants. Generally student workers may be classified as "Work

Dasgupta, Dipankar

492

View Payments to Vendors and Non-Employees  

E-Print Network [OSTI]

View Payments to Vendors and Non-Employees NUFinancials Purchasing Job Aid ViewPaymentsVendors to vendors for Purchase Orders, Direct Payment Requests, Visitor Expense Reports, and Contracted Services information via Accounts Payable · Method 6: View vendor payments by Dept ID via Accounts Payable · Helpful

Shull, Kenneth R.

493

All Quebec Retired Employees age 65 and over  

E-Print Network [OSTI]

be kept in a safe place known to you and your family. The Plan is underwritten by #12;Protecting Your; as well as life, disability and critical illness insurance for individuals and families. As a leadingAll Quebec Retired Employees age 65 and over #12;Great-West Life is a leading Canadian life

494

Notice to Employees Rev. 8-31-2004  

E-Print Network [OSTI]

. Section 31-294b of the Workers' Compensation Act states: "Any employee who has sustained an injury'Compensation Commission (1-800-223-9675). THIS NOTICE MUST BE IN TYPE OF NOT LESS THAN TEN POINT BOLD-FACE AND POSTED TO STATUTORY PENALTY (Section 31-279 C.G.S.). Date Posted YALE UNIVERSITY PMA MANAGEMENT CORP. OF NEW ENGLAND

495

Certification of Healthcare Provider for Employee's Serious Health Condition  

E-Print Network [OSTI]

to determine how long and what type of leave the employee will need. INSTRUCTIONS: HEALTH CARE PROVIDER: Please-MAIL SECTION II ­ To be completed by HEALTH CARE PROVIDER PART A: MEDICAL FACTS* (1) Probable DURATION: SECTION III: INFORMATION & SIGNATURE OF HEALTH CARE PROVIDER PROVIDER'S NAME ADDRESS OR STAMP TELEPHONE

California at Santa Barbara, University of

496

Share this with The number of employees accessing enterprise  

E-Print Network [OSTI]

devices continues to grow. Employees want access to corporate information from their personal devices when separate personal and corporate workspaces on the same device to provide visibility and control for IT their own devices as they normally would when away from work, sending personal texts and emails or keeping

Fisher, Kathleen

497

Termination or Transfer Checklist for Managers Employees can terminate from their positions for many reasons including  

E-Print Network [OSTI]

HR-FRM-050 Termination or Transfer Checklist for Managers Employees can terminate from etc. This checklist is to be used by managers when an employee is going to terminate from as part of the termination process. Type of Termination Resignation: If your employee is resigning, review

Abolmaesumi, Purang

498

Chapter 13 Employee Health and Safety 13.01 Safety Policy and Accident Reporting  

E-Print Network [OSTI]

to understand their responsibility for the safety of all persons coming into their work areas. EmployeesChapter 13 Employee Health and Safety 13.01 Safety Policy and Accident Reporting General Safety The safety of every student, visitor, and employee is a primary consideration in every University activity

Sheridan, Jennifer

499

Employee Performance Management and Recognition Program Order DOE O 331.1C  

Broader source: Energy.gov [DOE]

The purpose of this program is to establish requirements and responsibilities for the performance management program for all supervisory and non-supervisory employees at grades GS-15 and below or equivalent, employees in EJ and EK pay bands IV and V in the Excepted Service, and all wage grade employee

500

Independent Oversight Review of the Employee Concerns Program at the Savannah River Operations Office, July 2013  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG | Department ofHTS CableDepartment ofDepartment2011 |2008 |