Powered by Deep Web Technologies
Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Policy Flash 2011-49 OPAM | Department of Energy  

Energy Savers (EERE)

2011-49 OPAM DOE O 458.1 Admin Chg 1, Radiation Protection of the Public and the Environment Policy Flash 2011-49 OPAM More Documents & Publications Flash2011-45 OPAM...

2

Flash2011-71 OPAM | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Flash2011-71 OPAM Flash2011-71 OPAM DOE O 436.1 Departmental Sustainability Flash2011-71 OPAM More Documents & Publications Policy Flash 2011-47 OPAM Flash2011-76...

3

Flash2011-45 OPAM | Department of Energy  

Energy Savers (EERE)

5 OPAM Flash2011-45 OPAM DOE O 458.1 Radiation Protection of the Public and the Environment Flash2011-45 OPAM More Documents & Publications Policy Flash 2011-49 OPAM Flash2011-79...

4

FLASH2011-17-OPAM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7-OPAM FLASH2011-17-OPAM DOE M 470.4-1 Change 2, Safeguards and Security Program Planning and Management FLASH2011-17-OPAM More Documents & Publications FLASH2011-16-OPAM Policy...

5

Flash2011-72 OPAM | Department of Energy  

Energy Savers (EERE)

2 OPAM Flash2011-72 OPAM DOE O 414.1D Quality Assurance DOE O 226.1B Implementation of Department of Energy Oversight Policy Flash2011-72 OPAM More Documents & Publications Policy...

6

Flash2011-77 OPAM | Department of Energy  

Energy Savers (EERE)

77 OPAM Flash2011-77 OPAM Acquisition Guide Chapter 71.3, Data Reporting - Quality Management Flash2011-77 OPAM More Documents & Publications FLASH2011-11-OPAM Flash 2011-10 OPAM...

7

OPAM Policy Acquisition Guides | Department of Energy  

Energy Savers (EERE)

0 - Cost Accounting Standards Administration Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause OPAM Policy...

8

FLASH2011-34-OPAM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FLASH2011-34-OPAM Extension of Other Transaction Authority to enter into Technology Investment Agreements (TIAs) FLASH2011-34-OPAM More Documents & Publications Flash2011-63 OPAM...

9

Flash2011-32 OPAM | Department of Energy  

Office of Environmental Management (EM)

and Assignments Program Flash2011-32 OPAM More Documents & Publications FAQS Job Task Analyses - NNSA Package Certification Engineer Attachment FY2011-3(2) OPAM Flash 2011-58-OPAM...

10

Policy Flash 2011-48 | Department of Energy  

Energy Savers (EERE)

8 Policy Flash 2011-48 DOE O 225.1B Accident Investigations - OPAM Policy Flash 2011-48 More Documents & Publications Policy Flash 2011-84 Policy Flash 2011-47 OPAM Policy Flash...

11

FLASH2011-2-OPAM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FLASH2011-2-OPAM FLASH2011-2-OPAM POLITICAL ACTIVITY AT DOE FACILITIES OR BY DOE CONTRACTORS 2011-2 Attachment 1 Political Activity at DOE Facilities or by DOE Contractors, which...

12

Attachment FY2011-68 OPAM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

68 OPAM Attachment FY2011-68 OPAM Acquisition Letter AL-2011-04 Attachment FY2011-68 OPAM More Documents & Publications Flash2011-68 OPAM Policy Flash 2011-73 Attachment FY2011-73...

13

AttachmentFlash2011-2 -(2)-OPAM | Department of Energy  

Energy Savers (EERE)

AttachmentFlash2011-2 -(2)-OPAM AttachmentFlash2011-2 -(2)-OPAM REQUESTS BY POLITICAL CANDIDATES TO TOUR DOE FACILITIES AttachmentFlash2011-2 -(2)-OPAM More Documents &...

14

OPAM Policy Acquisition Guides | Department of Energy  

Energy Savers (EERE)

Policy Acquisition Guides Acquisition Guides OPAM Policy Acquisition Guides More Documents & Publications Weighted Guidelines Weighted Guidelines Microsoft Word - Final MR AL.doc...

15

FLASH2011-6-OPAM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FLASH2011-6-OPAM FLASH2011-6-OPAM THE SMALL BUSINESS JOBS ACT OF 2010 H.R. 5297 2011-6 Attachment 1 Summary of Public Law 111-240 The Small Business Jobs Act of 2010 2011-6...

16

Policy Flash 2011-76 | Department of Energy  

Office of Environmental Management (EM)

Policy Flash 2011-76 Policy Flash 2011-76 PolicyFlash2011-76.pdf More Documents & Publications Flash2011-76 OPAM Policy Flash 2011-84 Policy Flash 2011-60...

17

Policy Flash 2011-89 | Department of Energy  

Energy Savers (EERE)

9 Policy Flash 2011-89 PolicyFlash2011-89.pdf More Documents & Publications Policy Flash 2011-84 Policy Flash 2011-48 Policy Flash 2011-47 OPAM...

18

OPAM Policy Acquisition Guides  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17.3 (February 2004) 17.3 (February 2004) Acquisition, Use, and Disposal of Real Estate [Reference: DEAR 917.74, 970.5244-1] Overview This section provides internal Departmental information and a DOE point of contact for issues dealing with real estate acquisition, use, and disposal. Background DEAR 917.74 provides the policy and procedures to be followed in the acquisition, use, and disposal of real estate. In accordance with DEAR clause 970.5244-1, Management and Operating contractors also follow the DEAR 917.74 coverage when they acquire real property. Occasionally in the performance of cost type contracts, the performer will be required to acquire an interest in real estate. Real estate interests include purchases, leases, easements, permits, and licenses. In accordance with the current Secretarial delegation of authority for acquisition,

19

Attachment FY2011-77 OPAM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 OPAM Attachment FY2011-77 OPAM Data Quality Plan Attachment FY2011-77 OPAM More Documents & Publications Policy Flash 2011-77 Attachment 2 Source Selection Guide Source Selection...

20

Attachment FY2011-73 OPAM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

73 OPAM Attachment FY2011-73 OPAM Acquisition Letter AL-2011-04 Attachment FY2011-73 OPAM More Documents & Publications Policy Flash 2011-73 G Attachment FY2011-68...

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

OPAM Policy Acquisition Guides | Department of Energy  

Energy Savers (EERE)

FY2011-25 OPAM Chapter 23 - Environment, Energy and Water Efficiency, Renewable Energy Technologies, Occupational Safety, and Drug-free Workplace. Labor Standards for...

22

Policy_Flash_2011-85__Attachment_2.pdf | Department of Energy  

Energy Savers (EERE)

PolicyFlash2011-85Attachment2.pdf PolicyFlash2011-85Attachment2.pdf PolicyFlash2011-85Attachment2.pdf More Documents & Publications Attachment FY2011-46(1) OPAM...

23

POLICY FLASH  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: TO: FROM: January 28,2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management SUBJECT: Changes in Small Business Contracting Policy SUMMARY: This Policy Flash forwards changes to the Small Disadvantaged Business (SDB) price evaluation adjustment, new guidance from the U.S. Small Business Administration (SBA) on improving subcontracting opportunities with small businesses, and the requirement for recertification of small business status. Page 1 of3 POLICY FLASH 2005-16 1. The statute for the SDB price evaluation adjustment implemented in FAR Subpart 19.11 is no longer in effect for civilian agencies, except the National Aeronautics and Space Administration and Coast Guard. See the attached Civilian Agency Acquisition Council Letter, dated December 27,2004: ~ CAAC Letter 2004-04, Expirationc

24

POLICY FLASH  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 DATE: TO: FROM: February 10,2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Updates SUMMARY: This Policy Flash advises you of changes being made to five chapters of the Department of Energy Acquisition Guide. These changes are as follows: Pagel of 2 -_un - --- n__- Chapter 26.1 Energy Policy Act hnplementation - The changes to this chapter were updates and editorial style changes. Chapter 26.2 Energy Policy Act Cost Sharing Requirements - The changes to this chapter were updates and editorial style changes. Chapter 37.1 Support Service Contracting - Revisions were made to recognize performance based service acquisition. Other changes were updates and editorial style changes. Chapter39.1 Acquisitionof InformationResources- The changesto this chapterwere updates

25

Policy Flash 2012-12 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

12 12 Policy Flash 2012-12 As described in Policy Flash 2011-44, the Office of Federal Procurement Policy (OFPP) memorandum entitled "Myth-Busting: Addressing Misconceptions to Improve Communication with Industry during the Acquisition Process" required agencies to develop and submit a high-level vendor communication plan for OFPP approval. DOE's approved plan is attached. Attachment 1 - DOE Vendor Communication Plan Attachment 2 - Memo from OFPP titled "Myth-Busting": Addressing Misconceptions to Improve Communication with Industry during the Acquisition Process Policy_Flash_2012-12.pdf Policy_Flash_2012-12_Attachment_1.pdf Policy_Flash_2012-12_Attachment_2.pdf More Documents & Publications MEMORANDUM FOR CHIEF ACQUISITION OFFICERS Attachment FY2011-44 OPAM

26

Policy Flashes | Department of Energy  

Energy Savers (EERE)

Policy Flashes Policy Flashes The following is a list of Policy Flashes issued by the Office of Procurement and Assistance Policy. These files are in PDF (Portable Document Files)...

27

Policy Flash 20012-15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12-15 12-15 Policy Flash 20012-15 This AL is a reissuance (under the new AL number of 2012-05) of the AL on Meal Costs in Management and Operating Contracts that was originally issued on August 2, 2005 (under AL number 2005-12). It provides additional application guidance on: understanding the standards for reimbursement of contractor meal costs; applying the standards in determining the allowability of contractor meal costs; and overseeing the Department's and contractors' internal controls applicable to reimbursement of contractor meal costs. Attachment - AL 2012-05, Meal Costs in Management and Operation Contracts Policy_Flash_2012-15.pdf Policy_Flash_2012-15_Attachment.pdf More Documents & Publications Microsoft Word - AL2005-12.doc OPAM Policy Acquisition Guides

28

Policy Flash 20012-15 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

012-15 012-15 Policy Flash 20012-15 This AL is a reissuance (under the new AL number of 2012-05) of the AL on Meal Costs in Management and Operating Contracts that was originally issued on August 2, 2005 (under AL number 2005-12). It provides additional application guidance on: understanding the standards for reimbursement of contractor meal costs; applying the standards in determining the allowability of contractor meal costs; and overseeing the Department's and contractors' internal controls applicable to reimbursement of contractor meal costs. Attachment - AL 2012-05, Meal Costs in Management and Operation Contracts Policy_Flash_2012-15.pdf Policy_Flash_2012-15_Attachment.pdf More Documents & Publications Microsoft Word - AL2005-12.doc OPAM Policy Acquisition Guides

29

HEADQUARTERS POLICY FLASH  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

----- - ----- - HEADQUARTERS POLICY FLASH DATE: June 29,2005 TO: Procurement Directors FROM: Office of Procurement and Assistance Policy, ME-6 1 Office of Procurement and Assistance Management SUBJECT: Department of Energy Rulemaking on Research Misconduct SUMMARY: This Policy Flash distributes the Department's interim final rules on research misconduct that were published in the Federal Register on June 28, 2005 and are effective on July 28, 2005. These rules includes a general statement of policy and standard financial assistance and procurement requirements that implement the government-wide policy on research misconduct issued by the White IIouse Office of Science and Technology Page 1 of 2 POLICY FLASH 2005-41 The attached Federal Register Notice promulgates a new 10 CFR Part 733, "Allegations of

30

Policy Flash 2005-53  

Office of Environmental Management (EM)

POLICY FLASH 2011-61 DATE: March 28, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance...

31

Policy Flash 2005-53  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

POLICY FLASH 2011-58 DATE: March 16, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance...

32

Policy Flash 2005-53  

Energy Savers (EERE)

POLICY FLASH 2015-09 DATE: December 12, 2014 TO: Procurement Directors and Contracting Officers FROM: Director, Contract and Financial Assistance Policy Division Office of Policy...

33

Policy Flash 2012-54  

Energy.gov (U.S. Department of Energy (DOE))

Attached is Policy Flash 2012-54 Acquisition Guide Chapter 71.1, Headquarters Business Clearance Process

34

Policy Flash 2013-06  

Energy.gov (U.S. Department of Energy (DOE))

Attached is Policy Flash 2013-06 Executive Order-Strengthening Protections Against Trafficking in Persons in Federal Contracts.

35

Policy Flashes | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Policy Policy Flashes Policy Flashes The following is a list of Policy Flashes issued by the Office of Procurement and Assistance Policy. These files are in PDF (Portable Document Files) format. To read PDF files you must have Adobe Acrobat Reader, which is available at no charge from Adobe (http://www.adobe.com/). If you have any questions concerning this list, please contact the Office of Procurement and Assistance Policy on (202) 287-1330. If a Policy Flash and/or attachment is in a different format than Adobe Acrobat, the format type will be noted after the number of the Flash. View the archive of Policy Flashes for FY 2013. Earlier Policy Flashes can be found in the right bar of this screen. Number Topic 2014-11 Federal Acquisition Circular (FAC) 2005-71

36

Policy Flash 2013-42 Acquisition Guide Chapter 19.1- Summary of Small  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Acquisition Guide Chapter 19.1- Summary of 2 Acquisition Guide Chapter 19.1- Summary of Small Business Administration and Department of Energy Partnership Policy Flash 2013-42 Acquisition Guide Chapter 19.1- Summary of Small Business Administration and Department of Energy Partnership Attached is Policy Flash 2013-42 Acquisition Guide Chapter 19.1 - Summary of Small Business Administration and Department of Energy Partnership Agreement Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe.gov. Policy Flash 2013-42.pdf Department of Energy Partnership Agreement.pdf AG19 1.pdf More Documents & Publications Attachment FY2011-55 OPAM

37

Policy Flash 2012-61  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 DATE: August 16, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: COR Toolkit SUMMARY: The COR Toolkit cited in the attachments to Policy Flash 2012-25 and posted to/linked from various DOE Internet pages has been withdrawn until further notice. This Flash will be available online at the following website: http://energy.gov/management/office-management/operational- management/procurement-and-acquisition/policy-flashes. Questions concerning this policy flash should be directed to

38

Policy Flash 2012-49  

Energy.gov (U.S. Department of Energy (DOE))

Attached is Policy Flash 2012-49 Acquisition Guide Chapter 17.1- Interagency Acquisitions, Interagency Transactions, and Interagency Agreements- Minor Revision.

39

Policy Flash 2013-10  

Energy.gov (U.S. Department of Energy (DOE))

Attached is Policy Flash 2013-10 Hurricane Sandy Contingency Operation --Increase in Micro-Purchase and Simplified Acquisition Thresholds for Specific States and Counties

40

Policy Flash 2005-53  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

38 38 DATE: February 3, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Career Management Handbook Change 2011-01 SUMMARY: A recent review of the Department of Energy (DOE) Acquisition Career Management Program (ACMP), Financial Assistance Program certification identified opportunities for updating the courses required for Level I, Level II, and Level III certification. This Policy Flash and its attachment will be available online at the following website: http://www.management.energy.gov/policy_guidance/policy_flashes.htm. Questions concerning this policy flash should be directed to the Acquisition Career

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Policy Flash 2014-34  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to A. Scott Geary, of the  Office of Acquisition and Project Management Policy at 202-287-1507 or at andrew.geary@hq.doe.gov.

42

POlicy Flash 2013-60  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at Kevin.M.Smith@hq.doe.gov,  or at (202) 287-1614.

43

Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Acquisition Letter 09 - Revision of Department 2 Acquisition Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Questions concerning this policy flash should be directed to Robert M. Myers, Director, Contractor Human Resources Policy Division (MA-612) at (202) 287-1584 or robert.myers@hq.doe.gov. Policy Flash - DOE O 350 1.pdf Consolidated Model H-Clause 06-27-13.pdf Acquisition Letter - DOE O 350 1 6-27-13.pdf More Documents & Publications Chapter 30 - Cost Accounting Standards Administration OPAM Policy Acquisition Guides GAO-04-539 Department of Energy: Certain Postretirement Benefits for Contractor Employees Are Unfunded and Program Oversight Could Be Improved

44

Policy Flash 2011-86 | Department of Energy  

Office of Environmental Management (EM)

6 Policy Flash 2011-86 PolicyFlash2011-86.pdf More Documents & Publications Policy Flash 2011-84 Policy Flash 2011-60 Policy Flash 2011-9...

45

Policy Flash 2005-53 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

05-53 Policy Flash 2005-53 Policy Flash 2005-53 More Documents & Publications Policy Flash 2011-84 Policy Flash 2011-87 Policy Flash 2011-48...

46

Policy Flash 2011-60 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

60 Policy Flash 2011-60 PolicyFlash2011-60.pdf More Documents & Publications Policy Flash 2011-84 Policy Flash 2011-86 Policy Flash 2011-90...

47

Policy Flash 2011-93 | Department of Energy  

Office of Environmental Management (EM)

3 Policy Flash 2011-93 DOE O 420.2C Safety of Accelerator Facilities PolicyFlash2011-93.pdf More Documents & Publications Policy Flash 2011-84 Policy Flash 2011-48 Policy Flash...

48

Policy Flash 2011-87 | Department of Energy  

Office of Environmental Management (EM)

7 Policy Flash 2011-87 PolicyFlash2011-87.pdf More Documents & Publications Policy Flash 2011-84 Policy Flash 2005-53 Policy Flash 2011-6...

49

Policy Flash 2011-84 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

4 Policy Flash 2011-84 PolicyFlash2011-84.pdf More Documents & Publications Policy Flash 2005-53 Policy Flash 2011-87 Policy Flash 2011-48...

50

Policy Flash 2011-90 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

0 Policy Flash 2011-90 PolicyFlash2011-90.pdf More Documents & Publications Policy Flash 2011-84 Policy Flash 2011-60 Policy Flash 2011-86...

51

Policy Flash 2012-18  

Energy.gov (U.S. Department of Energy (DOE))

Policy Flash 2012-09, dated October 21, 2011, forwarded both FAR and DEAR contract clause matrices. The FAR matrix contained 2 errors. It listed FAR 52.215-12 and 13 as Not Applicable although they...

52

Policy Flash 2012-68  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

68 68 DATE: September 21, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Political Activity SUMMARY: Policy Flash 2011-2, issued October 5, 2010, provided information on the prohibition on using Government property and facilities to conduct political activities. Recently, there was an alleged misuse of the Department of Energy (DOE) e-mail system to conduct political activities by a DOE contractor. This Policy Flash serves as a reminder on political activities in the workplace during this election season. Government property and facilities are not authorized for political activity. DOE contractors are restricted from using Government property

53

Policy Flash 2005-53  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 DATE: March 16, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapters 4.1 - Procurement and Assistance Data System (PADS) and 4.3 - Requirements for the Industry Interactive Procurement System (IIPS) SUMMARY: With the implementation of Strategic Integrated Procurement Enterprise System (STRIPES), Acquisition Guide Chapters 4.1 - Procurement and Assistance Data System (PADS) and 4.3 - Requirements for the Industry Interactive Procurement System (IIPS) are hereby rescinded. This flash may be viewed at http://management.energy.gov/policy_guidance/policy_flashes.htm. Questions concerning this policy flash should be directed to Barbara Binney at (202) 287-1340

54

Policy Flashes 2014 | Department of Energy  

Energy Savers (EERE)

2014 Policy Flashes 2014 The following is a list of Policy Flashes issued by the Office of Procurement and Assistance Policy. These files are in PDF (Portable Document Files)...

55

Policy Flash 2013-08 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Policy Flash 2013-08 Attached: Policy Flash 2013-08 Major Disaster and Emergency Declarations for Specific States from Hurricane Sandy Questions concerning this policy flash...

56

Policy Flash 2012-21 | Department of Energy  

Energy Savers (EERE)

1 Policy Flash 2012-21 Attached is Policy Flash 2012-21 Class Deviation on Trade Agreements. PolicyFlash2012-21.pdf More Documents & Publications PolicyFlash2011-62.pdf Policy...

57

Policy Flash 2011-92 | Department of Energy  

Energy Savers (EERE)

Policy Flash 2011-92 Policy Flash 2011-92 Federal Acquisition Circular 2005-53. PolicyFlash2011-92.pdf PolicyFlash2011-92Attachment.pdf More Documents & Publications Policy...

58

DATE: TO: FROM: POLICY FLASH  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 5,2008 June 5,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: DOE 0 540.1B - Departmental Business Instrument Numbering System for Actions Conducted Outside of the Strategic Integrated Procurement Enterprise System (STRIPES) SUMMARY: This Policy flash is to inform you that the above listed Directive was issued on May 23,2008. This Order prescribes procedures for assigning identifying numbers to all new business instruments processed outside the Strategic Integrated Procurement Enterprise System. This Flash may be viewed online at the following website: http://mananement.energy.~ov/policy ~idance/policy flashes.htm. Questions regarding this Guide should be directed to the office identified in the "Contact"

59

Policy Flash 2005-53  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: November 4, 2011 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Accelerating Payment to Small Businesses for Goods and Services SUMMARY: With reference to Policy Flash 2012-02, Acquisition Guide Chapter 32.1 - Reviewing and Approving Contract Invoices, and OMB Memorandum M-11-32, "Accelerating Payment to Small Businesses for Goods and Services," established an Executive Branch policy to pay small business invoices as quickly as practicable, with a goal of paying within 15 days. Acquisition Guide Chapter 32.1 - Reviewing and Approving Contract Invoices implements this

60

Policy_Flash_2011-62.pdf | Department of Energy  

Energy Savers (EERE)

62.pdf PolicyFlash2011-62.pdf 2011-62 Attachment - Attachment to ACMP Flash 2011-62 PolicyFlash2011-62.pdf More Documents & Publications PolicyFlash2011-62Attachment.pdf...

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Policy Flashes FY 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Flashes FY 2013 Flashes FY 2013 Policy Flashes FY 2013 The following is a list of Policy Flashes issued by the Office of Procurement and Assistance Policy. These files are in PDF (Portable Document Files) format. To read PDF files you must have Adobe Acrobat Reader, which is available at no charge from Adobe (http://www.adobe.com/). If you have any questions concerning this list, please contact the Office of Procurement and Assistance Policy on (202) 287-1330. If a Policy Flash and/or attachment is in a different format than Adobe Acrobat, the format type will be noted after the number of the Flash. View the archive of Policy Flashes for FY 2012. Number Topic 2013-79 Professional and Consultant service costs (FAR 31.205-33) 2013-78 Acquisition Guide Chapter 7.3 Acquisition Planning in the M&O Enviroment

62

DATE: TO: POLICY FLASH  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 19,2008 Procurement Directors Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: DOE M 205.1-5 - Cyber Security Process Requirements Manual SUMMARY: The Department issued a Contractor Requirements Document (CRD) on August 12,2008 to the above listed Directive. Under the Department's Directives Program (DOE Order 25 1.1 B), Heads of Field Elements are responsible for determining which contracts are to include this CRD. Contracting Officers, once notified, are responsible for incorporating the CRD into affected contracts. Since some Heads of Field Elements may not be aware that this change has been issued, Contracting Officers should request their determination of which, if any, contracts are affected and remind them that they

63

Policy Flash 2014-34 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Flash 2014-34 Policy Flash 2014-34 Questions concerning this policy flash should be directed to A. Scott Geary, of the Office of Acquisition and Project Management Policy at...

64

Policy Flash 2011-61 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

1-61 Policy Flash 2011-61 2011-61 Attachment - Acquisition, Use, and Disposal of Real Estate PolicyFlash2011-61.pdf More Documents & Publications Flash2011-91.pdf Flash2011-83...

65

Policy Flash 2015-03 CRA Appropriations  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning the policy flash should be directed to Richard Bonnell at (202) 287-1747 or at richard.bonnell@hq.doe.gov.

66

Policy Flash 2012-59  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 DATE: August 6, 2012 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Section 311 Revised Template August 2012 SUMMARY: Attached are 3 revised templates for sending the Section 311 notices to Congress as prescribed in Acquisition Letter (AL) 2012-07 and Financial Assistance Letter (FAL) 2012-01. The template revises the first bullet to use of the program name and subprogram name found in the appropriations, instead of the treasury account number. If there are multiple program names and/or subprogram names, then these will need to be listed. This Flash will be available online at the following website:

67

Policy Flash 2012-38 | Department of Energy  

Office of Environmental Management (EM)

38 Policy Flash 2012-38 Attached is Policy Flash 2012-38 Acquisition Guide 42.2 Foreign Travel Approval Questions concerning the policy flash should be directed to Richard Bonnell...

68

Policy Flash 2012-43 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Policy Flash 2012-43 Attached is Policy Flash 2012-44 Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Questions concerning this policy flash should be directed to...

69

Policy Flash 2012-57 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

57 Policy Flash 2012-57 Attached is Policy Flash 2012-57 Communication to All Department of Energy Contractors Questions concerning this policy flash should be directed to Richard...

70

Policy Flash 2012-30 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2-30 Policy Flash 2012-30 Attached is Policy Flash 2012-30, Acquisition Guide Chapter 9.4 - Contractor Responsibility Determinations. PolicyFlash2012-30.pdf AcqGuideChapter9.4...

71

Policy Flash 2013-17 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Policy Flash 2013-17 Attached is Policy Flash 2013-17 Federal Acquisition Circular 2005-62 Questions concerning this policy flash should be directed to Barbara Binney, of the...

72

Policy Flash 2012-50 | Department of Energy  

Office of Environmental Management (EM)

Policy Flash 2012-50 Policy Flash 2012-50 Attached Policy Flash 2012-50 Department of Energy Audit Guide for For-Profit Recipients Questions regarding the contracts intended to be...

73

Policy Flash 2012-61 | Department of Energy  

Energy Savers (EERE)

1 Policy Flash 2012-61 Attached is Policy Flash 2012-61 COR Tool Kit Rescission. Questions concerning this policy flash should be directed to Lorri Wilkins of the Professional...

74

Policy Flash 2012-63 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Policy Flash 2012-63 Attached is Policy Flash 2012-63 Update Department of Energy Acquisition Guide Chapter 22.1 Labor Standards Questions concerning this policy flash should be...

75

Policy Flash 2012-67 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Policy Flash 2012-67 Attached is Policy Flash 2012-67, Acquisition Savings Reporting Template Guidance Questions concerning this policy flash should be directed to Scott Clemons...

76

Policy Flash 2012-42 | Department of Energy  

Office of Environmental Management (EM)

2 Policy Flash 2012-42 Attached is Policy flash 2012-42 Federal Acquisition Circular 2005-59 Questions concerning this policy flash should be directed to Richard Langston, of the...

77

Policy Flash 2013-09 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

09 Policy Flash 2013-09 Attached: Policy Flash 2013-09 Acquisition Guide Chapter 7.1 - Acquisition Planning Questions concerning this policy flash should be directed to Jason...

78

Policy Flash 2012-26 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

26 Policy Flash 2012-26 Below is Policy Flash 2012-26, Release of Department of Energy Award Fee and Incentive Fee Reports PolicyFlash2012-26.pdf More Documents & Publications...

79

Policy Flash 2012-41 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1 Policy Flash 2012-41 Attached is Policy flash 2012-41 OFPP Myth-Busting Memo Questions concerning this policy flash should be directed to Jason Taylor at (202) 287-1945 or...

80

Policy Flash 2012-35 | Department of Energy  

Energy Savers (EERE)

5 Policy Flash 2012-35 Attached is Policy Flash 2012-35 Federal Acquisition Circular 2005-58 Questions concerning this policy flash should be directed to Richard Langston at (202)...

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Policy Flash 2013-18 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Policy Flash 2013-18 Attached is Policy Flash 2013-18 Federal Acquisition Circular 2005-63 Questions concerning this policy flash should be directed to Barbara Binney, of the...

82

Policy Flash 2012-46 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Policy Flash 2012-46 Attached is Policy Flash 2012-46 Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Questions concerning this policy flash should be directed to...

83

Policy Flash 2012-48 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

8 Policy Flash 2012-48 Attached is Policy Flash 2012-48: Interim Reporting for Advanced Notifications of Awards (ANA) Questions concerning this policy flash should be directed to...

84

Policy Flash 2012-58 | Department of Energy  

Office of Environmental Management (EM)

8 Policy Flash 2012-58 Attached is Policy Flash 2012-58 Federal Acquisition Circular 2005-60 Questions concerning this policy flash should be directed to Richard Langston, of the...

85

Policy Flash 2012-59 | Department of Energy  

Office of Environmental Management (EM)

9 Policy Flash 2012-59 Attached is Policy Flash 2012-59 Section 311 Revised Template August 2012 Questions concerning this policy flash should be directed to Barbara Binney, of the...

86

Policy Flash 2013-04 | Department of Energy  

Office of Environmental Management (EM)

3-04 Policy Flash 2013-04 Attached is Policy Flash 2013-04 Extension of SBA-DOE 8(a) Partnership Agreement. Questions concerning this policy flash should be directed to Jason...

87

Policy Flash 2013-19 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Policy Flash 2013-19 Attached is Policy Flash 2013-19 Federal Acquisition Circular 2005-64 Questions concerning this policy flash should be directed to Barbara Binney, of the...

88

Policy Flash 2012-53 | Department of Energy  

Energy Savers (EERE)

3 Policy Flash 2012-53 Policy Flash 2012-53 M-12-16: Providing Prompt Payment to Small Business Subcontractors More Documents & Publications Policy Flash 2013-69 Extension of...

89

Policy Flash 2013-65 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Flash 2013-65 Policy Flash 2013-65 Questions concerning this policy flash should be directed to Mike Larson of the Office of Acquisition and Project Management, Strategic...

90

Policy Flash 2013-13 | Department of Energy  

Office of Environmental Management (EM)

3-13 Policy Flash 2013-13 Attached is Policy Flash 2013-13 Further Extension of SBA-DOE 8(a) Partnership Agreement Questions concerning this policy flash should be directed to...

91

POLICY FLASH 2013-67 FAC-68 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-67 FAC-68 POLICY FLASH 2013-67 FAC-68 Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project...

92

DATE: TO: POLICY FLASH L 110-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

L 110- L 110- June 1,2010 Procurement Directors FROM: Office of Procurement and Assistance Policy, MA-6 1 Office of Procurement and Assistance Management SUBJECT: Supplemental Audit Services SUMMARY: The Office of Procurement and Assistance Management (OPAM) awarded a contract for supplemental audit services on May 12,20 10. The purpose of this contract is to perform audit services in support of both financial assistance and contractual instrument awards department-wide. Although the focus of this contract is for auditing ARRA work, other non- ARRA auditing services may also be ordered. The contract is with KPMG LLP and is an Indefinite-Delivery-Indefinite-Quantity type and was awarded on a Time-and-Materials basis. The contract runs through May 1 1,20 15 and has a

93

POLICY FLASH 2014-12 Executive Compensation Cap | Department...  

Energy Savers (EERE)

2 Executive Compensation Cap POLICY FLASH 2014-12 Executive Compensation Cap Questions concerning this policy flash should be directed to Carol Jenkins, of the Office of...

94

Policy Flash 2012-34 | Department of Energy  

Energy Savers (EERE)

4 Policy Flash 2012-34 Attached is Policy Flash 34-Waiver of Mandatory Use of the Strategic Integrated Procurement Enterprise System (STRIPES) for GSA Global Supply Service...

95

Policy Flash: 2013-52 Contractor Legal Management Requirements...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Flash: 2013-52 Contractor Legal Management Requirements: Final Rule Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule Questions concerning this policy...

96

Policy Flash 2014-19 Electronic Products Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19 Electronic Products Environmental Assessment Tool (EPEAT) Policy Flash 2014-19 Electronic Products Environmental Assessment Tool (EPEAT) Questions concerning this policy flash...

97

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain...  

Office of Environmental Management (EM)

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's...

98

OPAM Policy Acquisition Guides  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 2006) October 2006) 1 Contingency Contracting Authorities: 42 U.S.C. 5150, Robert T. Stafford Disaster Relief and Emergency Assistance Act, P.L. 93-288 as amended Preference shall be given to those organizations, firms, or individuals residing or doing business in the area affected for the purpose of debris clearance, distribution of supplies, reconstruction, and other major disaster or emergency assistance activities. Defense Priorities and Allocation System Program (DPAS) Title I of the Defense Production Act of 1950, as amended, authorizes the President to require preferential acceptance and performance of contracts or orders supporting certain approved national defense and energy programs, and to allocate materials (including equipment), services, and facilities in such a manner as to promote these

99

OPAM Policy Acquisition Guides  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 15.4-2 (January 2007) Chapter 15.4-2 (January 2007) 1 Weighted Guidelines [References: FAR 15.4, DEAR 915.4] Overview This section provides guidance for applying the Department's structured approach in determining profit/fee. Background The FAR requires consideration of certain factors (described in 15.404-4 as "profit- analysis factors" or "common factors") in developing a structured profit/fee approach. DOE's structured approach for determining profit/fee objectives is used in those acquisitions when the contracting officer is required to perform a cost analysis. This system provides a comprehensive approach for determining a fair profit or fee. It ensures consistent consideration of the relative value of the factors and provides a basis for

100

Policy Flash 2013-15 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Flash 2013-15 Attached is Policy Flash 2013-15 DOE O 231.1B, Environment, Safety and Health Reporting Questions concerning this policy flash should be directed to Jason Taylor of...

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Microsoft Word - Policy Flash 2010-81 Attachment 1 | Department...  

Energy Savers (EERE)

Flash 2010-81 Attachment 1 Microsoft Word - Policy Flash 2010-81 Attachment 2 Policy Flash 2014-13 AL 2014-03: Allowability of Contractor Litigation Defense and Settlement Costs...

102

Policy Flashes FY 2004 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Policy Flashes FY 2004 The following is a list of Policy Flashes issued by the Office of Procurement and Assistance Policy. These files are in PDF (Portable Document Files) format. To read PDF files you must have Adobe Acrobat Reader, which is available at no charge from Adobe (http://www.adobe.com/). If you have any questions concerning this list, please contact the Office of Procurement and Assistance Policy on (202) 287-1330. If a Policy Flash and/or attachment is in a different format than Adobe Acrobat, the format type will be noted after the number of the Flash. 2004-26 (pdf) - Discretionary Set-Aside Authority 2004-26 Attachment (pdf) - Memorandum from Richard Hopf on Discretionary Set-Aside Authority 2004-25 (pdf) - Nepotism in Contracting (with attachment)

103

Policy Flashes for 2007 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 Policy Flashes for 2007 The following is a list of Policy Flashes issued by the Office of Procurement and Assistance Policy. These files are in PDF (Portable Document Files) format. To read PDF files you must have Adobe Acrobat Reader, which is available at no charge from Adobe (http://www.adobe.com/). If you have any questions concerning this list, please contact the Office of Procurement and Assistance Policy on (202) 287-1330. If a Policy Flash and/or attachment is in a different format than Adobe Acrobat, the format type will be noted after the number of the Flash. 2007-62 Executive Order 13423, Strengthening Federal Environmental, Energy and Transportation Management 2007-62 Attachment Acquisition Letter 2007-12, Executive Order 13423, Strengthening Federal Environmental, Energy and Transportation Management

104

Policy Flashes for 2008 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 Policy Flashes for 2008 The following is a list of Policy Flashes issued by the Office of Procurement and Assistance Policy. These files are in PDF (Portable Document Files) format. To read PDF files you must have Adobe Acrobat Reader, which is available at no charge from Adobe (http://www.adobe.com/). If you have any questions concerning this list, please contact the Office of Procurement and Assistance Policy on (202) 287-1330. If a Policy Flash and/or attachment is in a different format than Adobe Acrobat, the format type will be noted after the number of the Flash. 2008-67 Federal Acquisition Circular (FAC) 2005-27 2008-67 Attachment 1 Federal Acquisition Circular (FAC) 2005-27 2008-67 Attachment 2 Federal Register Notice of September 17, 2008 2008-66 Revised Acquisition Guide Chapter 71.1 Headquarters Business

105

Policy Flashes FY 2003 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Policy Flashes FY 2003 The following is a list of Policy Flashes issued by the Office of Procurement and Assistance Policy. These files are in PDF (Portable Document Files) format. To read PDF files you must have Adobe Acrobat Reader, which is available at no charge from Adobe (http://www.adobe.com/). If you have any questions concerning this list, please contact the Office of Procurement and Assistance Policy on (202) 287-1330. If a Policy Flash and/or attachment is in a different format than Adobe Acrobat, the format type will be noted after the number of the Flash. 2003-32 (pdf) Amendment of the Department of Energy Acquisition Regulation (DEAR) to Revise Conditional Payment of Fee Clause 2003-31 (pdf) Federal Acquisition Circular (FAC) 2001-16 -

106

CRB Policy Flashes | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CRB Policy Flashes CRB Policy Flashes CRB Policy Flashes In addition to granting certifications for DOE project management personnel, the Board is also tasked with developing and updating the policies that define the requisite knowledge, skills, and abilities needed to fulfill the Departmental mission for the effective management of capital asset projects as defined in DOE O 413.3B. To that end, the Board also establishes PMCDP certification requirements and publishes them in the Certification and Equivalency Guideline. In an effort to better inform the various participating program offices of changes within the PMCDP and the various certification requirements needed for each level of PMCDP certification, the Board publishes policy flash documents that are available for download here on the PMCDP Web site. New

107

Policy Flash 2012-29 | Department of Energy  

Office of Environmental Management (EM)

Policy Flash 2012-29 Policy Flash 2012-29 Attached is Policy Flash 2012-29 Federal Acquisition Circular 2005-56 and 57 PolicyFlash2012-29.pdf AttachmentFAC-2005-56&FAC-2005-57...

108

Policy Flash 2014-19 Electronic Products Environmental Assessment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Flash 2014-19 Electronic Products Environmental Assessment Tool (EPEAT) Policy Flash 2014-19 Electronic Products Environmental Assessment Tool (EPEAT) Questions concerning this...

109

Policy Flashes - FY 2002 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Policy Flashes - FY 2002 The following is a list of Policy Flashes issued by the Office of Procurement and Assistance Policy. To obtain any Policy Flash listed below please contact Office of Policy at DOE_OAPM@hq.doe.gov or on (202) 287-1330. 2002-42 Federal Acquisition Circular 2001-10 2002-42 Attachment Federal Acquisition Circular 2001-10 2002-41 Revisions and Additions to the Department of Energy (DOE) Acquisition Guide - Chapter 7, Acquisition Planning, and Chapter 71, Headquarters Review of Contract and Financial Assistance Actions 2002-40 Extension of Price-Anderson Act - 1) Awarded Contracts, 2) Proposed Awards, and 3) Reinstatement of Acquisition Letter (AL) 2002-04 2002-39 Financial Assistance Letter (FAL) 2002-03, Implementation of DOE's Industry Interactive Procurement System (IIPS)

110

Policy Flashes - FY 2001 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Policy Flashes - FY 2001 The following is a list of Policy Flashes issued by the Office of Procurement and Assistance Policy. To obtain any Policy Flash listed below please contact Office of Policy at DOE_OAPM@hq.doe.gov or on (202) 287-1330. Number Topic 2001-29 Biological Etiologic Agents Notice 450.7 Implementation 2001-28 Greening the Government Executive Orders 2001-27 Implementation of New Advance Award Notification System 2001-26 Federal Acquisition Circular 2001-01 2001-25 Financial Assistance Letter (FAL) 2001-04 and Acquisition Letter 2001-05 2001-24 Financial Assistance Letter (FAL) 2001-03 and e-Digest 2001-23 Restrictions on Management and Operating and Support Services Contracting 2001-22 New Acquisition Guide Chapter 2001-21 Acquisition Letter (AL) 2001-04

111

POLICY FLASH 2014-16 In September 2012, DOE issued Policy Flash...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 In September 2012, DOE issued Policy Flash 2012-67, Acquisition Savings Reporting Template Guidance to fully comply with reporting requirements. This is an update to that Policy...

112

Policy Flash 2012-60 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Flash 2012-60 Acquisition Guide Chapter 13.1, Purchase Card Policy and Operating Procedures Questions concerning this policy flash should be directed to Denise T. Clarke...

113

Policy Flash 2011-72 | Department of Energy  

Office of Environmental Management (EM)

72 Policy Flash 2011-72 DOE O 414.1D Quality Assurance and DOE O 226.1B Implementation of Department of Energy Oversight Policy PolicyFlash2011-72.pdf More Documents &...

114

Policy Flashes FY 2012 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FY 2012 FY 2012 Policy Flashes FY 2012 Archive of Policy Flashes issued in FY 2012. Number Topic 2012-70 Department of Energy Federal Acquisition Regulation Clause Usage Guide 2012-69 DEAR Contract Clause Matrix 2012-68 Political Activity 2012-67 Acquisition Savings Reporting Guidance 2012-66 Attachment to Policy Flash on New Procedures for Submitting Clause or Template Changes 2012-65 Federal Acquisition Circular 61 2012-64 Contract Clause Matrix 2012-63 Update Department of Energy Acquisition Guide Chapter 22.1 Labor Standards 2012-62 Class Deviation DEAR 950.7006/AL 2012-10, Implementation of the Price-Anderson Act of 2005 2012-61 DOE COR Toolkit Recission 2012-60 Acquisition Guide Chapter 13.1, Purchase Card Policy and Operating Procedures 2012-59 Section 311 Revised Template August 2012

115

Policy Flash 2015-04-Class Deviation: Min Wage  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Sharon Archer of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management...

116

Policy Flash 2014-22 Chart Supplement to Acquistion Guide  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at ...

117

Policy Flash 2012-31 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Foreign Travel. Questions concerning this policy flash should be directed to Kevin M. Smith of the Contract and Financial Assistance Policy Division, Office of Policy, Office of...

118

Policy Flash 2013-14 | Department of Energy  

Energy Savers (EERE)

Requirement Questions concerning this policy flash should be directed to Kevin Smith of the Contract and Financial Assistance Policy Division, Office of Policy, Office of...

119

Microsoft PowerPoint - IGCA Training 2011-OPAM | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IGCA Training 2011-OPAM Microsoft PowerPoint - IGCA Training 2011-OPAM IGCA Inventory Data Collection Tool Training 2011 Microsoft PowerPoint - IGCA Training 2011-OPAM More...

120

Attachment FY2011-25 OPAM | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

OPAM Attachment FY2011-25 OPAM Federal Leadership in Environmental, Energy, and Economic Performance Attachment FY2011-25 OPAM More Documents & Publications Chapter 23 -...

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Policy Flash 2005-53  

Office of Environmental Management (EM)

2 DATE: May 9, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Acquisition and Assistance Management SUBJECT:...

122

Policy Flash 2005-53  

Energy Savers (EERE)

1-76 DATE: May 19, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Acquisition and Assistance Management...

123

Policy Flash 2013-79 Professional and Consultant service cost...  

Energy Savers (EERE)

9 Professional and Consultant service cost (FAR 31.205-33) Policy Flash 2013-79 Professional and Consultant service cost (FAR 31.205-33) Questions concerning this policy flash...

124

Policy Flash 2014-38 Federal Acquisition Circular (FAC) 2005...  

Energy Savers (EERE)

4-38 Federal Acquisition Circular (FAC) 2005-76 Policy Flash 2014-38 Federal Acquisition Circular (FAC) 2005-76 Questions concerning this policy flash should be directed to Jason...

125

POLICY FLASH 2014-31 Federal Acquisition Circulars (FACs) 2005...  

Energy Savers (EERE)

POLICY FLASH 2014-31 Federal Acquisition Circulars (FACs) 2005-73 and 2005-74 POLICY FLASH 2014-31 Federal Acquisition Circulars (FACs) 2005-73 and 2005-74 Questions concerning...

126

Policy Flash 2012-18 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

A corrected matrix is attached. Attachment - Federal Acquisition Regulation Clause Usage Guide PolicyFlash2012-18.pdf PolicyFlash2012-18Attachment.pdf More Documents &...

127

Policy Flash 2012-37 | Department of Energy  

Office of Environmental Management (EM)

37 Policy Flash 2012-37 Attached is Policy Flash 2012-37 Acquisition Guide Chapter 4.6 - Assigning Identifying Numbers Outside of the Strategic Integrated Procurement Enterprise...

128

Policy Flash 2012-47 | Department of Energy  

Energy Savers (EERE)

7 Policy Flash 2012-47 Attached is Policy Flash 2012-47: Delay of Rollout of the System for Award Management (SAM) by the General Services Administration (GSA) Questions should be...

129

Policy Flash 2011-95 | Department of Energy  

Energy Savers (EERE)

5 Policy Flash 2011-95 On July 21, 2011, the Department issued a Contractor Requirements Document (CRD) for DOE O 452.8, Control of Nuclear Weapons Data Policy Flash 2011-950.pdf...

130

Policy Flash 2013-57 New Strategic Sourcing Acquisition Guide...  

Energy Savers (EERE)

57 New Strategic Sourcing Acquisition Guide Chapter 7.2 Policy Flash 2013-57 New Strategic Sourcing Acquisition Guide Chapter 7.2 Questions concerning this policy flash should be...

131

Policy Flash 2012-45 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

5 Policy Flash 2012-45 Attached is Policy Flash 2012-45 Rollout of the System for Award Management (SAM) by the General Services Administration (GSA) Questions should be directed...

132

Policy Flash 2011-101 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

1 Policy Flash 2011-101 Flash 2011-101 - OFPP Policy Letter 11-01, Performance of Inherently Governmental and Critical Functions. On September 12, 2011, the Office of Federal...

133

Policy Flash 2014-11 Federal Acquisition Circular (FAC) 2005...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Federal Acquisition Circular (FAC) 2005-71 Policy Flash 2014-11 Federal Acquisition Circular (FAC) 2005-71 Questions concerning this policy flash should be directed to Barbara...

134

Policy Flash 2013-37 Federal Acquisition Circular (FAC) 2005...  

Energy Savers (EERE)

37 Federal Acquisition Circular (FAC) 2005-66 Policy Flash 2013-37 Federal Acquisition Circular (FAC) 2005-66 Attached is Policy Flash 2013-37 Federal Acquisition Circular (FAC)...

135

Policy Flash 2012-44 | Department of Energy  

Energy Savers (EERE)

4 Policy Flash 2012-44 Attached is POLICY FLASH 2012-44 Congressional Notifications- Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2 Section 2.6.1...

136

Policy Flash 2013-27 Federal Acquisition Circular (FAC) 2005...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

27 Federal Acquisition Circular (FAC) 2005-65 Policy Flash 2013-27 Federal Acquisition Circular (FAC) 2005-65 Attached is Policy Flash 2013-27 Federal Acquisition Circular (FAC)...

137

Policy Flash 2012-33 | Department of Energy  

Energy Savers (EERE)

3 Policy Flash 2012-33 Attached Policy Flash 2012-33 DOE O 580.1A Department of Energy Personal Property Management Program. Questions regarding the contracts intended to be...

138

Policy Flash 2011-100 | Department of Energy  

Office of Environmental Management (EM)

00 Policy Flash 2011-100 The Department issued Contractor Requirements Documents (CRDs) for the subject Directives on August 30, 2011. PolicyFlash2011-100.pdf More Documents &...

139

Policy Flash 2013-36 Update to Congressional Notifications -...  

Office of Environmental Management (EM)

Policy Flash 2013-36 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Policy Flash 2013-36 Update to...

140

Policy Flash 2012-33 | Department of Energy  

Office of Environmental Management (EM)

2-33 Policy Flash 2012-33 Attached Policy Flash 2012-33 DOE O 580.1A Department of Energy Personal Property Management Program. Questions regarding the contracts intended to be...

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Policy Flash 2012-37 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Policy Flash 2012-37 Attached is Policy Flash 2012-37 Acquisition Guide Chapter 4.6 - Assigning Identifying Numbers Outside of the Strategic Integrated Procurement Enterprise...

142

Policy Flash 2009-01 Tips for Processing Financial Assistance...  

Energy Savers (EERE)

09-01 Tips for Processing Financial Assistance Actions in STRIPES Policy Flash 2009-01 Tips for Processing Financial Assistance Actions in STRIPES Attached is Policy Flash 2009-01...

143

Policy Flash 2012-14 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

14 Policy Flash 2012-14 With reference to Policy Flash 2012-02, Acquisition Guide Chapter 32.1 - Reviewing and Approving Contract Invoices, and OMB Memorandum M-11-32,...

144

Policy Flash 2012-13 | Department of Energy  

Office of Environmental Management (EM)

Policy Flash 2012-13 Policy Flash 2012-13 Attached for your information is a list of FAR amendments published in today's Federal Register (76 FR 68027, November 2, 2011)....

145

Policy Flash 2012-23 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

3 Policy Flash 2012-23 Attached is Policy Flash 2012-23 FAR Part 17 Special Contracting Methods and Part 35 Research and Development Contracting. Updated 22812. Revisions to FAR...

146

Policy Flash 2012-68 | Department of Energy  

Office of Environmental Management (EM)

is Policy Flash 2012-68 Political Activity Questions should be directed to Kevin Smith at (202) 287-1705 or kevin.m.smith@hq.doe.gov. Policy Flash 2012-68 Contractor...

147

POlicy Flash 2013-60 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Flash 2013-60 Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at Kevin.M.Smith@hq.doe.gov...

148

Policy Flash 2012-27 | Department of Energy  

Energy Savers (EERE)

7 Policy Flash 2012-27 Below is Policy Flash 2012-27 and an attachment, a summary of Federal Acquisition Circular 2005-56. PolicyFlash2012-27.pdf AttachmentFAC2005-56Summary.p...

149

Policy Flash 2012-2 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Flash 2012-2 Policy Flash 2012-2 Policy Flash 2012-2 OMB Memorandum M-11-32, "Accelerating Payment to Small Businesses for Goods and Services," established an Executive Branch policy to pay small business invoices as quickly as practicable, with a goal of paying within 15 days. Acquisition Guide Chapter 32.1 - Reviewing and Approving Contract Invoices is revised to implement this policy. Attachment 1 - Acquisition Guide Chapter 32.1, Reviewing and Approving Contractor Invoices (updated October 2011) Attachment 2 - Memo from OMB M-11-32, Accelerating Payment to Small Businesses for Goods and Services Policy_Flash_2012-02.pdf Policy_Flash_2012-02_Attachment_1_0.pdf Policy_Flash_2012-02_Attachment_2_0.pdf More Documents & Publications Policy Flash 2012-14 Chapter 32 - Contract Financing

150

Attachment FY2011-74 OPAM | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 OPAM Attachment FY2011-74 OPAM Acquisition Letter AL 2011-05 FAL 2011-01 Attachment FY2011-74 OPAM More Documents & Publications Attachment FY2011-74 OPAM Attachment FY2011-74...

151

Policy Flash 2012-6 | Department of Energy  

Office of Environmental Management (EM)

6 Policy Flash 2012-6 Office of Federal Procurement Policy's (OFPP) memorandum, dated September 29, 2011, Development, Review and Approval of Business Cases for Certain Interagency...

152

Policy Flash 2012-40 | Department of Energy  

Office of Environmental Management (EM)

Matters Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division at (202) 287-1614 or at...

153

Policy Flash 2005-53  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 DATE: October 4, 2011 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: Acquisition Guide Chapter 32.1 - Reviewing and Approving Contract Invoices SUMMARY: OMB Memorandum M-11-32, "Accelerating Payment to Small Businesses for Goods and Services," established an Executive Branch policy to pay small business invoices as quickly as practicable, with a goal of paying within 15 days. Acquisition Guide Chapter 32.1 - Reviewing and Approving Contract Invoices is revised to implement this policy.

154

Policy Flash 2012-66  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 DATE: September 19, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: New Procedures for Submitting Clause or Template Changes SUMMARY: Attached are the new procedures for submitting requests for clause or template changes to the official versions of the clauses and templates contained in STRIPES; including additions or changes to local clauses and templates. Only Site Points of Contact (SPOCs) or Contract and Financial Assistance Policy Division (CFAPD) staff, of the Office of Acquisition and Project Management's Office of Policy, can initiate requests for additions or

155

Policy Flash 2005-53  

Office of Environmental Management (EM)

14, 2011 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Acquisition Guide...

156

Policy Flash 2013-05 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Policy Flash 2013-05 Attached is Policy Flash 2013-05 Class Deviation from the Federal Acquisition Regulation (FAR) to Implement Office of Management and Budget (OMB) Policy Memorandum M-12-16, Providing Prompt Payment to Small Business Subcontractors. Questions concerning this policy flash should be directed to Nancy Harvey of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at Nancy.Harvey@hq.doe.gov. Class Deviation -Providing Prompt Payment 2013-05.pdf Signed Deviation Bosco-Waddell w-attachement.pdf More Documents & Publications Policy Flash 2014-11 Federal Acquisition Circular (FAC) 2005-71 Policy Flashes FY 2013 Policy Flash 2013-69 Extension of Policy to Provide accelerated payment to

157

Policy Flash 2005-53  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 41 DATE: May 8, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Procurement and Assistance Management SUBJECT: OFPP Myth-busting 2 Memorandum SUMMARY: The Office of Federal Procurement Policy, (OFPP) issued the attached memorandum entitled "Myth-Busting 2": Addressing Misconceptions and Further Improving Communication During the Acquisition Process on May 7, 2012. Whereas last year's "myth-busting" memorandum focused on misconceptions on the part of federal personnel, this second version addresses common misconceptions held by industry. It also provides some additional strategies for promoting more effective communication.

158

Policy Flash 2014-10 Update to Congressional Notifications - Full  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Update to Congressional Notifications - Full 0 Update to Congressional Notifications - Full Implementation of Advanced Notification of Awards (ANA) System Policy Flash 2014-10 Update to Congressional Notifications - Full Implementation of Advanced Notification of Awards (ANA) System The ANA system can be accessed directly at: https://iportalwc.doe.gov/pls/apex/f?p=ANA This flash and its attachments may be viewed at http://management.energy.gov/policy_guidance/policy_flashes.htm. Questions concerning this policy flash should be directed to Elle Clayton at 202-287-1444 or ellen.clayton@hq.doe.gov. New Policy_Flash_2013- ANA1172013 ec.pdf ANA User's Guide.pdf More Documents & Publications POLICY FLASH 2014-10 UPDATE TO CONGRESSIONAL NOTIFICATION_ FULL IMPLEMENTATION OF ANA SYSTEM Policy Flash 2013-36 Update to Congressional Notifications - Acquisition

159

Policy Flash 2012-57  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 DATE: July 30, 2012 TO: Heads of Contracting Activities/Procurement Directors FROM: Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Communication to All Department of Energy Contractors SUMMARY: Information is provided herein that is to be disseminated to all Department of Energy (DOE) prime Contractors. Please direct all of your Contracting Officers to electronically dispatch the information to all their prime contractors immediately. If an electronic message of non-deliverability is received, Contracting Officers should attempt delivery by an alternate means of delivery. Procurement Directors are directed to provide confirmation to Berta

160

Policy Flash 2012-53  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 DATE: July 18, 2012 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Accelerating Payment to Small Business Subcontractors SUMMARY: OMB Memorandum M-11-32, "Accelerating Payment to Small Businesses for Goods and Services" established an Executive Branch policy to pay small business invoices as quickly as practicable, with a goal of paying within 15 days. As a follow-up, OMB has issued Memorandum M-12-16 (attached) in order to similarly accelerate payment to small business subcontractors. In order to do so, the memorandum states that "agencies should, to the full extent permitted by

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Policy Flash 2013-2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 DATE: October 2, 2012 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Continuing Appropriations Resolution, 2013 -- Congressional Notification of Pending Contract or Financial Assistance Actions in excess of $1 Million under the Continuing Resolution SUMMARY: Section 101(a)(4) of the Continuing Appropriations Resolution Act, 2013, Pub. L No. 112-175, makes appropriations available through March 27, 2013 for continuing projects or activities that were conducted under Consolidated Appropriations Act, 2012, Pub. L. No.112-74, under the same authority and conditions. Therefore, the Section 311 Congressional Notice

162

Policy Flash 2012-67  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 7 DATE: September 21, 2012 TO: Procurement Directors Head of Contracting Activities FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Acquisition Savings Reporting Template Guidance SUMMARY: As part of the Office of Management and Budget (OMB) Acquisition Savings Initiative and the DOE Strategic Sourcing Program, a key challenge has been to address the requirements of reporting cost savings and cost avoidance data. In order for DOE to fully comply with reporting requirements, we are directing that the attached template be utilized for reporting acquisition savings/cost avoidance data effective as of October 1, 2012.

163

F POLICY FLASH 2009-24  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2009-24 POLICY FLASH 2009-24 1 DATE: TO: FROM: r February 12,2009 Procurement Directors Office of Procurement and Assistance Management SUBJECT: Management of Excess Weapons Inventories and Selective Sensitive Equipment SUMMARY: A recent Office of Inspector General (OIG) audit identified opportunities for improving the Department of Energy (DOE) management of excess weapons and its processes for identifying and tracking of sensitive items. Specifically, the OIG recommended that DOE amend existing guidance to ensure that appropriate processes are in place to effectively manage excess inventories of weapons, and to ensure the timely declaration of excess weapons. The OIG also recommended that DOE update its guidance regarding the identification of high risklsensitive equipment.

164

Policy Flash 2005-53  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

20 20 DATE: November 17, 2010 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Interim Guidance on DOE Personal Property Foreign Transactions SUMMARY: The attached Acquisition Letter provides interim direction and procedural guidance to DOE and NNSA on proper protocol for personal property transactions executed with foreign entities, to include property title transfers, loans and abandonments and pertains to personal property in the hand of the Federal government, contractor or a third party. Direction and guidance is specific to accountable personal property, as defined in DOE Order 580.1. Guidance in this Acquisition Letter shall be followed until DOE Order 580.1 is updated to

165

Policy Flash 2013-1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 DATE: October 2, 2012 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Continuing Appropriations Resolution, 2013 -- Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report SUMMARY: Section 101(a)(4) of the Continuing Appropriations Resolution, 2013, Pub. L No. 112-175, makes appropriations available through March 27, 2013 for continuing projects or activities that were conducted under Consolidated Appropriations Act, 2012, Pub. L. No.112-74, under the same authority and conditions. Section 104 provides that no appropriation under the continuing

166

Policy Flash 2013-26 Guidance for tracking inquiries related...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Questions concerning this policy flash should be directed to Karina Edmonds, Technology Transfer Coordinator, at (202) 586-2678 or at karina.edmonds@hq.doe.gov. Flash 2013-26...

167

Policy Flash 2012-4 | Department of Energy  

Energy Savers (EERE)

4 Policy Flash 2012-4 This Flash is issued to provide you an Acquisition Letter containing information and guidance regarding application of labor standards at the Department of...

168

Policy Flash 2013-07 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 Policy Flash 2013-07 The attached Flash announces the issuance of AL 2013-01 on Contractor Extended Personnel Assignments. This AL provide additional guidance on the earlier SPEs...

169

Policy Flash 2013-20 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Policy Flash 2013-20 Attached is Policy Flash 2013-20 Section 311 Revised Template January 4 2013 Questions concerning this policy flash should be directed to Barbara Binney, Office of Contract and Financial Assistance Policy Division at (202) 287-1340 or at Barbara.Binney@hq.doe.gov. Attachment 1 DOE Section 311 Contract Award Letter revised Jan 4 2013.pdf Attachment 2A DOE Section 311 Financial Assistance Letter revised Jan 4 2013.pdf Attachment 2B DOE Section 311 Financial Assistance Letter revised Jan 4 2013.pdf Policy flash 2013-20 Section 311 revised templateJan 4 2013.pdf More Documents & Publications Policy Flash 2013-22 Section 311 Revised Template January 24 2013 Policy Flash 2012-59 Letter to Congress RE: Office of Civilian Radioactive Waste Management's

170

Policy Flash 2013-69 Extension of Policy to Provide accelerated...  

Office of Environmental Management (EM)

69 Extension of Policy to Provide accelerated payment to small business subcontractors Policy Flash 2013-69 Extension of Policy to Provide accelerated payment to small business...

171

Policy Flash 2013-01 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3-01 3-01 Policy Flash 2013-01 Questions concerning the policy flash should be directed to Barbara Binney at (202) 287-1340 or barbara.binney@hq.doe.gov for the AL or Richard Bonnell at (202) 287-1747 or at richard.bonnell@hq.doe.gov for the FAL. Questions concerning the policy flash should be directed to Barbara Binney at (202) 287-1340 or barbara.binney@hq.doe.gov for the AL or Richard Bonnell at (202) 287-1747 or at richard.bonnell@hq.doe.gov for the FAL. More Documents & Publications Policy Flash 2013-1 Policy Flash 2014-05 Continuing Appropriations Act, 2014 -- Implementation of Division F, Title I, Title II, and Title III, and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No. 113-6 Policy Flash 2013-31 Class Deviation from the Federal Acquisition

172

Policy Flash 2013-12 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Policy Flash 2013-12 Attached is Policy Flash 2013-12 Section 301(b) Congressional Notification of Multi-year Contract Award Report Revision for Fiscal Year 2013 Questions concerning the policy flash should be directed to Barbara Binney at (202) 287-1340 or barbara.binney@hq.doe.gov. Questions concerning completing the spreadsheet should be directed to Casey Pearce at (202) 287-5810 or at casey.pearce@hq.doe.gov. Policy Flash 2013-12 FY 2013 301(b) reporting revision.pdf Updated 301(b) Spreadsheet.xlsx More Documents & Publications Policy Flash 2014-05 Continuing Appropriations Act, 2014 -- Implementation of Division F, Title I, Title II, and Title III, and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No. 113-6 Policy Flash 2013-53 Implementation of Division F, Title I, II, III AL

173

Policy Flash 2014-04 Continuing Appropriations Act, 2014 -- Congressio...  

Office of Environmental Management (EM)

4 Continuing Appropriations Act, 2014 -- Congressional Notification of Pending Contract or Financial Assistance Actions Policy Flash 2014-04 Continuing Appropriations Act, 2014 --...

174

Policy Flash 2014-29 Acquisition Letter 07 - Benchmark Compensation...  

Energy Savers (EERE)

07 - Benchmark Compensation Amount for Individual Executive Salary Actions Policy Flash 2014-29 Acquisition Letter 07 - Benchmark Compensation Amount for Individual Executive...

175

Policy Flash 2013-65 Procurement Evaluation & Re-Engineering...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule Policy Flash 2013-65 Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of...

176

Policy Flash 2013-30 Acquisition Letter on Acquisition Planning...  

Energy Savers (EERE)

Letter on Acquisition Planning Considerations for Management and Operating Contracts Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management...

177

Policy Flash 20 Acquisition Letter 2014-05/Financial Acquisition...  

Energy Savers (EERE)

Appropriations Committees Subject to Energy and Water Development and Related Agencies Policy Flash 20 Acquisition Letter 2014-05Financial Acquisition Letter 2014-02 Congressional...

178

POLICY FLASH 2014-10 UPDATE TO CONGRESSIONAL NOTIFICATION_ FULL...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 UPDATE TO CONGRESSIONAL NOTIFICATION FULL IMPLEMENTATION OF ANA SYSTEM POLICY FLASH 2014-10 UPDATE TO CONGRESSIONAL NOTIFICATION FULL IMPLEMENTATION OF ANA SYSTEM An updated...

179

Policy Flash 2014-32 General Accountability Office Report (GAO...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Improve Oversight of Work performed for non-DOE Entities (GAO 1478 October 2013) Policy Flash 2014-32 General Accountability Office Report (GAO) final report entitled...

180

Policy Flash 2014-06 Affirmative procurement of biobased products...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of biobased products under service and construction contracts (FAR clause 52.223-2) Policy Flash 2014-06 Affirmative procurement of biobased products under service and...

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

POLICY FLASH 2014-15 Determination of Benchmark Compensation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Determination of Benchmark Compensation Amount for Certain Executives and Employees POLICY FLASH 2014-15 Determination of Benchmark Compensation Amount for Certain Executives and...

182

Policy Flash 2014-04 Continuing Appropriations Act, 2014 -- Congressio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2014 -- Congressional Notification of Pending Contract or Financial Assistance Actions Policy Flash 2014-04 Continuing Appropriations Act, 2014 -- Congressional Notification of...

183

Policy Flash 2011-2 Attachment 1 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Policy Flash 2011-2 Attachment 1 During election seasons, questions arise regarding political activities on DOE facilities or using DOE email addresses. The General Counsel has...

184

Policy Flash 2015-12 Service Contracts Reporting (SCR) Requirements  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Carol Jenkins at 202-287-1827 or carol.jenkins@hq.doe.gov.

185

Policy Flash 2012-52 | Department of Energy  

Office of Environmental Management (EM)

Attached is Policy Flash 2012-52 The Deputy Secretary's Memorandum on Reporting Conference Related Activities and Spending Reporting Conference Related Activities and...

186

POLICY FLASH 2013-58 Revised Guide for Financial Assistance  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Ellen Colligan at (202) 287-1776 or Ellen.colligan@hq.doe.gov.

187

Policy Flash 2012-7 | Department of Energy  

Office of Environmental Management (EM)

Sustainable Acquisition and Reporting Attachment 2 - Memo from DOD, Reporting Sustainability Attributes to the Federal Procurement Data System (FPDS) PolicyFlash2012-07.pdf...

188

Policy Flash 2013-30 Acquisition Letter on Acquisition Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Acquisition Letter on Acquisition Planning 0 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts Attached is Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe.gov. Policy Flash_MO Acq Planning AL.pdf AL_ 2013-03 Acq Planning_MO.pdf More Documents & Publications Attachment FY2011-09(3) Policy Flash 2013-78 Acquisition Guide Chapter 7.3 Acquisition Planning in

189

Policy Flash 2012-12 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

12 12 Policy Flash 2012-12 As described in Policy Flash 2011-44, the Office of Federal Procurement Policy (OFPP) memorandum entitled "Myth-Busting: Addressing Misconceptions to Improve Communication with Industry during the Acquisition Process" required agencies to develop and submit a high-level vendor communication plan for OFPP approval. DOE's approved plan is attached. Attachment 1 - DOE Vendor Communication Plan Attachment 2 - Memo from OFPP titled "Myth-Busting": Addressing Misconceptions to Improve Communication with Industry during the Acquisition Process Policy_Flash_2012-12.pdf Policy_Flash_2012-12_Attachment_1.pdf Policy_Flash_2012-12_Attachment_2.pdf More Documents & Publications MEMORANDUM FOR CHIEF ACQUISITION OFFICERS OFPP "Myth-busting" Memo (2/2/11)

190

DATE: TO: FROM: SUBJECT: SUMMARY: POLICY FLASH  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TO: TO: FROM: SUBJECT: SUMMARY: POLICY FLASH 2005..19 March 1, 2005 Procurement Directors Office of Procurement and Assistance Policy, ME-61 Office of Procurement and Assistance Management STARS Conversion In April 2005, the Department will be converting to the new Standard Accounting and Reporting System (STARS). Department contractors and vendors will be encouraged to submit invoices early for goods or services to be delivered in March 2005 so they can be processed and paid by the end of the month. For such payment, invoices must be received by the Oak Ridge Financial Service Center not later than March 17,2005, and approving officials must provide their approvals by March 24,2005. Page 1 of2 To ensure a smooth transition, a one-time, limited delegation of Contracting Officer authority has been granted to the Director at Oak Ridge Financial Service Center for the purpose of signing

191

Policy Flash 2015-04-Class Deviation: Min Wage | Department of...  

Office of Environmental Management (EM)

Policy Flash 2015-04-Class Deviation: Min Wage Policy Flash 2015-04-Class Deviation: Min Wage Questions concerning this policy flash should be directed to Sharon Archer of the...

192

Policy Flash 2013-45 Source Selection Guide | Department of Energy  

Energy Savers (EERE)

Policy Flash 2013-45 Source Selection Guide Policy Flash 2013-45 Source Selection Guide Questions concerning this policy flash should be directed to Jeff Burgan at (865) 241-2513...

193

Policy Flash 2014-18 Complex-Wide Strategic Sourcing | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Flash 2014-18 Complex-Wide Strategic Sourcing Policy Flash 2014-18 Complex-Wide Strategic Sourcing Questions concerning this policy flash should be directed to Scott Clemons...

194

Policy_Flash_2011-59__Attachment.pdf | Department of Energy  

Energy Savers (EERE)

PolicyFlash2011-59Attachment.pdf PolicyFlash2011-59Attachment.pdf PolicyFlash2011-59Attachment.pdf More Documents & Publications PartnershipAgreementsTraining&0;...

195

Policy Flash 2013-77 Contractor Performance Information  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management Policy at (202) 287-1340 or at Barbara.Binney@hq.doe.gov.

196

Policy Flash 2012-64 | Department of Energy  

Office of Environmental Management (EM)

5 Federal Acquisition Circular 61 Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Procurement and Assistance Policy at (202) 287-1340...

197

Policy Flash 2012-2 | Department of Energy  

Energy Savers (EERE)

Policy Flash 2012-2 OMB Memorandum M-11-32, "Accelerating Payment to Small Businesses for Goods and Services," established an Executive Branch policy to pay small business...

198

Policy Flash 2012-69 | Department of Energy  

Office of Environmental Management (EM)

Clause Usage Guide Questions concerning this policy flash should be directed to Kevin Smith, of the Office of Procurement and Assistance Policy at (202) 287-1614 or at...

199

Policy Flash 2012-70 | Department of Energy  

Energy Savers (EERE)

Clause Usage Guide Questions concerning this policy flash should be directed to Kevin Smith, of the Office of Procurement and Assistance Policy at (202) 287-1614 or at...

200

Policy Flash 2013-11 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plan Process Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at (202) 287-1614 or at...

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Policy Flash 2015-07 FAC 2005-78  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Jason Taylor, of the Contract and Financial Assistance Policy Division at (202) 287-1560 or at Jason.Taylor@hq.doe.gov

202

Policy Flash 2013-29 Leveraging the General Services Administration's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Leveraging the General Services 9 Leveraging the General Services Administration's SmartPay2 Program and its Single Use Account Feature Policy Flash 2013-29 Leveraging the General Services Administration's SmartPay2 Program and its Single Use Account Feature Attached is Policy Flash 2013-29: Leveraging the General Services Administration's SmartPay2 Program and its Single Use Account Feature Questions concerning this policy flash should be directed to Denise T. Clarke of the Office of Acquisition and Project Management, Strategic Programs Division at (202) 287-1748 or at DeniseT.Clarke@hq.doe.gov. POLICY_FLASH_2013_28 Leveraging GSA SmartPay2.pdf Signed_Memo with_ attachments.pdf More Documents & Publications Policy Flash 2013-50 Leveraging the General Services Administration's SmartPay2 Program and its Single Use Account Feature

203

Policy Flash 2012-44 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Policy Flash 2012-44 Attached is POLICY FLASH 2012-44 Congressional Notifications- Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2 Section 2.6.1 Questions concerning this policy flash and the acquisition guide chapter should be directed to Barbara Binney at (202) 287-1340 or barbara.binney@hq.doe.gov. Questions concerning this policy flash and the financial assistance guide chapter should be directed to Ellen Colligan at (202) 287-1767 or Ellen.colligan@hq.doe.gov. For STRIPES, ANA System, or iPortal questions, contact the Energy IT Services (EITS) Service Desk at (301) 903-2500 or email EITSServiceDesk@hq.doe.gov. Policy_Flash_2012-44_0.pdf AcqGuide5pt1 for contracts only.pdf Advanced Notification of Awards (ANA) User Guide.pdf

204

Policy Flash 2012-11 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Policy Flash 2012-11 As part of the Office of Management and Budget (OMB) Acquisition Savings Initiative and the DOE Strategic Sourcing Program, a key challenge has been to address the requirements of reporting cost savings and cost avoidance data. In order for DOE to fully comply with reporting requirements, we are directing that the attached template be utilized for reporting Fiscal Year (FY) 2012 data. Attachment 1 - Memo regarding Standardized Cost Savings Definitions and Reporting Template Attachment 2 - Standardized Cost Savings Definitions and Reporting Template (excel) Policy_Flash_2012-11.pdf Policy_Flash_2012-11_Attachment_1.pdf Policy_Flash_2012-11_Attachment_2.xlsx More Documents & Publications Policy Flash 2012-67 Contractor Purchasing Balanced Scorecard for FY 2012

205

POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

23 Acquisition Guide 13.3 Simplified Acquisition Procedures POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition Procedures Questions concerning this policy flash...

206

AcqGuide4.2-OPAM | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

.2-OPAM AcqGuide4.2-OPAM Requirements for Contracting with Public Relations Firms AcqGuide4.2-OPAM More Documents & Publications Chapter 4 - Administrative Matters Microsoft Word -...

207

Policy Flash 2012-8 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-8 2-8 Policy Flash 2012-8 Reference earlier Policy Flash 2011-103, Consent to Subcontracts on Management and Operating Contracts. The Flash had discussed the possibility of an Acquisition Letter and possibly a DEAR amendment to improve Consent to Subcontract efficiency and to ensure we apply our limited resources to those subcontract actions that truly pose the most risk. Closer analysis revealed that only a change to Acquisition Guide Chapter 70.7, Chapter 10, paragraph B, was needed to accomplish these process improvements. Attachment - Acquisition Guide Chapter 70.7, Chapter 10, Subcontractor Management (Revised October 19, 2011) Policy_Flash_2012-08.pdf Policy_Flash_2012-08_Attachment.pdf More Documents & Publications Microsoft Word - Chapter 10_2006_Jun

208

Policy Flash 2012-14 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Policy Flash 2012-14 With reference to Policy Flash 2012-02, Acquisition Guide Chapter 32.1 - Reviewing and Approving Contract Invoices, and OMB Memorandum M-11-32, "Accelerating Payment to Small Businesses for Goods and Services," established an Executive Branch policy to pay small business invoices as quickly as practicable, with a goal of paying within 15 days. Acquisition Guide Chapter 32.1 - Reviewing and Approving Contract Invoices implements this policy. See the attachment below with the DOE response to OMB memorandum. Attachment - Response to OMB Memorandum M-11-32 Accelerating Payments to Small Businesses for Good and Services To see Policy Flash 2012-02 and Acquisition Guide Chapter 32.1. Attachment - Policy Flash 2012-02 and Acquisition Guide Chapter

209

Policy Flash 2012-32 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Policy Flash 2012-32 Attached is Policy Flash 2012-32 Acquisition Guide Chapter 17.1 - Interagency Acquisitions, Interagency Transactions and Interagency Agreements Questions concerning this policy flash should be directed to Barbara Binney of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Procurement and Assistance Management at (202) 287-1340 or barbara.binney@hq.doe.gov. Policy_Flash_2012-32_0.pdf AcqGuide_17.1_Interagency_Acquisitions_April_9_2012.pdf 17.1_Attachment_1_OFPP_Guidance_Interagence_Acquisitions_June_2008.pdf 17.1_Attachment_2_OFPPbusinesscaseguidance92911.pdf 3a-attachment_IA_FUNDS_OUT_Assisted_Aquisition_Part_A_april_2_2012.pdf 3a-attachment_IA_FUNDS_OUT_Assisted_Aquisition_Part_B_april_2_2012.pdf 3b-attachment_IA_FUNDS_OUT_Interagency_Transaction_Part_A_april_2_2012.pdf

210

Policy Flash 2012-62 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Policy Flash 2012-62 Attached is Policy Flash 2012-62 Class Deviation DEAR 950.7006/AL 2012-10, Implementation of the Price-Anderson Act of 2005 Questions concerning this policy flash should be directed to Nancy Harvey of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at Nancy.Harvey@hq.doe.gov. Policy Flash 2012-62 AL 2012-10, Implementation of the Price-Anderson Amendments Act of 2005 Class Deviation Findings and Determination - DEAR 950.7006, Statutory nuclear hazards indemnity agreement More Documents & Publications Microsoft Word - AL2005-15.doc Appendix A. Notice of Inquiry: Preparation of Report to Congress on Price-Anderson Act. 62 Federal Register 68,272 (December 31, 1997)

211

Policy Flash 2012-39 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

39 39 Policy Flash 2012-39 Attached is Policy Flash 2012-39 Department of Energy (DOE) Audit Guidance for For-Profit Recipients Questions concerning this policy flash should be directed to Ellen Colligan of the Contracts and Financial Assistance Policy Division, Office of Policy, Office of Procurement and Assistance Management at (202) 287-1776 or at Ellen.Colligan@hq.doe.gov. Policy_Flash_2012-39.pdf DOE_Audit_Guidance_for_For-Profit_Financial_Assistance_Awards (Part_I)_April_2012_0.pdf DOE_Audit_Guidance_for_For-Profit_Financial_Assistance_Awards (Part_II)_April_2012_0.pdf DOE_Audit_Guidance_for_For-Profit_Financial_Assistance_Awards_(Part_III)_April_2012_0.pdf DOE_Audit_Guidance_for_For-Profit_FA_(Part IV) Matrix_of_Compliance_Requirements_April_2012_0.pdf

212

Policy FLash 2014-36 FAC 2005-75 | Department of Energy  

Energy Savers (EERE)

FLash 2014-36 FAC 2005-75 Policy FLash 2014-36 FAC 2005-75 Questions concerning this policy flash should be directed to Jason Taylor, of the Contract and Financial Assistance...

213

Policy FLash 2013-72 Acqusition Guide 43.2 Change Order ADministration...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

FLash 2013-72 Acqusition Guide 43.2 Change Order ADministration Policy FLash 2013-72 Acqusition Guide 43.2 Change Order ADministration Questions concerning this policy flash should...

214

Policy Flashes for FY 2006 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Policy Flashes for FY 2006 The following is a list of Policy Flashes issued by the Office of Procurement and Assistance Policy. These files are in PDF (Portable Document Files) format. To read PDF files you must have Adobe Acrobat Reader, which is available at no charge from Adobe (http://www.adobe.com/). If you have any questions concerning this list, please contact the Office of Procurement and Assistance Policy on (202) 287-1330. If a Policy Flash and/or attachment is in a different format than Adobe Acrobat, the format type will be noted after the number of the Flash. 2006-62 Revision to Chapter 42.5, Contract Management Planning, of the Department of Energy Acquisition Guide 2006-62 Attachment Acquisition Guide Chapter 42.5, Contract Management Planning

215

Policy Flashes for 2009 & 2010 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for 2009 & 2010 for 2009 & 2010 Policy Flashes for 2009 & 2010 The following is a list of Policy Flashes issued by the Office of Procurement and Assistance Policy. These files are in PDF (Portable Document Files) format. To read PDF files you must have Adobe Acrobat Reader, which is available at no charge from Adobe (http://www.adobe.com/). If you have any questions concerning this list, please contact the Office of Procurement and Assistance Policy on (202) 287-1330. If a Policy Flash and/or attachment is in a different format than Adobe Acrobat, the format type will be noted after the number of the Flash. Number Topic 2010-83 DOE Acquisition Guide Chapter 23 2010-83 Attachment DOE Acquisition Guide Chapter 23 2010-82 Subaward Reporting For Federal Funding and Transparency Act of 2006 (FFATA)

216

Policy Flashes for FY 2005 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 Policy Flashes for FY 2005 The following is a list of Policy Flashes issued by the Office of Procurement and Assistance Policy. These files are in PDF (Portable Document Files) format. To read PDF files you must have Adobe Acrobat Reader, which is available at no charge from Adobe (http://www.adobe.com/). If you have any questions concerning this list, please contact the Office of Procurement and Assistance Policy on (202) 287-1330. If a Policy Flash and/or attachment is in a different format than Adobe Acrobat, the format type will be noted after the number of the Flash. 2005-58 (pdf) - Acquisition Letter 2005-15, Implementation of the Identity Proofing Requirement of HSPD-12 and FIPS Pub 201 2005-58 Attachment (pdf) - Acquisition Letter 2005-16, Implementation of

217

Policy Flash 2013-36 Update to Congressional Notifications - Acquisition  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

36 Update to Congressional Notifications - 36 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Policy Flash 2013-36 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Attached is Policy Flash 2013-36 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Questions concerning this policy flash and the acquisition guide chapter should be directed to Barbara Binney at (202) 287-1340 or barbara.binney@hq.doe.gov. Questions concerning this policy flash and the financial assistance guide chapter should be directed to Ellen Colligan at (202) 287-1776 or ellen.colligan@hq.doe.gov.

218

Policy Flash 2013-36 Update to Congressional Notifications - Acquisition  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Update to Congressional Notifications - 6 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Policy Flash 2013-36 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Attached is Policy Flash 2013-36 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Questions concerning this policy flash and the acquisition guide chapter should be directed to Barbara Binney at (202) 287-1340 or barbara.binney@hq.doe.gov. Questions concerning this policy flash and the financial assistance guide chapter should be directed to Ellen Colligan at (202) 287-1776 or ellen.colligan@hq.doe.gov.

219

Policy Flash 2014-05 Continuing Appropriations Act, 2014 -- Implementation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Continuing Appropriations Act, 2014 -- 5 Continuing Appropriations Act, 2014 -- Implementation of Division F, Title I, Title II, and Title III, and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No. 113-6 Policy Flash 2014-05 Continuing Appropriations Act, 2014 -- Implementation of Division F, Title I, Title II, and Title III, and Division G, Consolidated and Further Continuing Appropriations Act, 2013, Pub. L. No. 113-6 Questions concerning the policy flash should be directed to Barbara Binney at (202) 287-1340 or barbara.binney@hq.doe.gov for the AL or Richard Bonnell at (202) 287-1747 or at richard.bonnell@hq.doe.gov for the FAL. Policy flash 2014-05 CRA Appropriations AL FY2014.pdf More Documents & Publications Policy Flash 2014-04 Continuing Appropriations Act, 2014 -- Congressional

220

POLICY FLASH 2014-10 UPDATE TO CONGRESSIONAL NOTIFICATION_ FULL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2014-10 UPDATE TO CONGRESSIONAL NOTIFICATION_ FULL POLICY FLASH 2014-10 UPDATE TO CONGRESSIONAL NOTIFICATION_ FULL IMPLEMENTATION OF ANA SYSTEM POLICY FLASH 2014-10 UPDATE TO CONGRESSIONAL NOTIFICATION_ FULL IMPLEMENTATION OF ANA SYSTEM An updated copy of the ANA Users Guide is attached and can be found at the ANA iPortal space at https://iportalwc.doe.gov/webcenter/spaces/ANA_SPACE/ The ANA system can be accessed directly at: https://iportalwc.doe.gov/pls/apex/f?p=ANA Questions concerning this policy flash should be directed to Elle Clayton at 202-287-1444 or ellen.clayton@hq.doe.gov. If you have questions or need assistance using the ANA system, please contact the iManage Help Desk Support at (301) 903-2500 and select option 4, option 1, option 1. For Congressional Affairs Support, send an e-mail to CI-ANA@hq.doe.gov.

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Policy Flash 2012-51 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

policy flash should be directed to John Lucas, Assistant General Counsel for Technology Transfer in the Office of the General Counsel by phone at (202) 586-2939 or by email at...

222

Policy Flash 2012-13 | Department of Energy  

Energy Savers (EERE)

3 Policy Flash 2012-13 Attached for your information is a list of FAR amendments published in today's Federal Register (76 FR 68027, November 2, 2011). Attachment - List of Rules...

223

Policy Flash 2015 Revision to the Federal Assistance Reporting...  

NLE Websites -- All DOE Office Websites (Extended Search)

Revision to the Federal Assistance Reporting Checklist, DOE F 4600.2 (102014). Policy Flash 2015 Revision to the Federal Assistance Reporting Checklist, DOE F 4600.2 (102014)....

224

Policy Flash 2013-29 Leveraging the General Services Administration...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

General Services Administration's SmartPay2 Program and its Single Use Account Feature Policy Flash 2013-29 Leveraging the General Services Administration's SmartPay2 Program and...

225

Policy Flash 2012-19 | Department of Energy  

Energy Savers (EERE)

9 Policy Flash 2012-19 Attached for your information is a summary of FAR amendments published in the Federal Register (77 FR 33405, January 3, 2012) and a January 11, 2012...

226

Policy Flash 2011-98 | Department of Energy  

Energy Savers (EERE)

8 Policy Flash 2011-98 The attached class deviation from DEAR 970.5244-1(g) has been issued to increase the dollar threshold from 100,000 to 500,000 for: (1) determinations of...

227

Policy Flash 2013-28 Implementation of Indian Energy Preference...  

Energy Savers (EERE)

of Indian Energy Preference Provision in EP Act 2005 and Acquisition Letter 2013-02 Policy Flash 2013-28 Implementation of Indian Energy Preference Provision in EP Act 2005 and...

228

Policy Flash 2011-73 | Department of Energy  

Energy Savers (EERE)

Continuing Appropriations Act, 2011 Policy Flash 2011-73 Attachment - Acquisition Letter AL-2011-04 - Implementation of Division B, Title I, Section 1101(a)(2) of the Department of...

229

Policy Flash 2012-1 | Department of Energy  

Office of Environmental Management (EM)

1 Policy Flash 2012-1 Acquisition Letter (AL) 2012-01 has been issued. It lists ALs currently in effect and the discontinued ALs, along with the reason why the AL is no longer in...

230

Policy Flash 2012-5 | Department of Energy  

Energy Savers (EERE)

5 Policy Flash 2012-5 This AL is a reissuance under a new AL number of AL 2005-11, Home Office Expenses of Management and Operating Contracts. Attachment - Aquisition Letter...

231

Policy Flash 2012-36 | Department of Energy  

Energy Savers (EERE)

6 Policy Flash 2012-36 The statutory provisions addressed in this AL are a continuation of the provisions effective on the enactment date of the Consolidated Appropriations Act of...

232

Policy Flash 2012-36 | Department of Energy  

Office of Environmental Management (EM)

2-36 Policy Flash 2012-36 The statutory provisions addressed in this AL are a continuation of the provisions effective on the enactment date of the Consolidated Appropriations Act...

233

Policy Flash 2012-66 | Department of Energy  

Energy Savers (EERE)

or Template Changes Questions concerning this policy flash should be directed to Kevin Smith at (202) 287- 1614 or kevin.m.smith@hq.doe.gov (for Acquisition) or Ellen Colligan at...

234

Policy Flash 2012-55 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

in STRIPES Questions concerning this policy flash should be directed to Kevin Smith at (202) 287- 1614 or kevin.m.smith@hq.doe.gov (for Acquisition) or Ellen Colligan at...

235

Policy Flash 2014-38 FAC 2005-76 | Department of Energy  

Energy Savers (EERE)

8 FAC 2005-76 Policy Flash 2014-38 FAC 2005-76 Questions concerning this policy flash should be directed to Jason Taylor, of the Contract and Financial Assistance Policy Division...

236

Flash2004-23Attachment_2.pdf | Department of Energy  

Office of Environmental Management (EM)

Flash2004-23Attachment2.pdf Flash2004-23Attachment2.pdf More Documents & Publications December 12, 2013 Business Opportunity Session Presentations Attachment FY2011-28 OPAM...

237

Policy Flash 2015-06 Energy Star and Electronic Products Environmental Assessment Tool (EPEAT)  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Sharon Archer of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management...

238

Policy Flash 2015-02 INCREMENTALLY FUNDING FIXED-PRICE ACTIONS  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at ...

239

Policy Flash 2014-19 Electronic Products Environmental Assessment Tool (EPEAT)  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Sharon Archer of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management...

240

Policy Flash 2013-69 Extension of Policy to Provide accelerated payment to small business subcontractors  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Lawrence Butler, of the Contract and Financial Assistance Policy Division at (202) 287-1945 or at lawrence.butler@hq.doe.gov.

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Policy Flash 2013-64 Acquisition Letter 10 and Class Deviation for  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Flash 2013-64 Acquisition Letter 10 and Class Deviation for Policy Flash 2013-64 Acquisition Letter 10 and Class Deviation for Nondisplacement of Qualified Workers Policy Flash 2013-64 Acquisition Letter 10 and Class Deviation for Nondisplacement of Qualified Workers Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe.gov. Policy Flash_Nondisplacement.pdf SIGNED_classdeviation970.5244-1.pdf AL nondisplacement of qualified workers.pdf More Documents & Publications Policy Flash 2013-79 Professional and Consultant service cost (FAR 31.205-33) Policy Flash 2013-41 Contracts Periods of Performance Exceeding 5 Years Policy Flashes FY 2013

242

POLICY FLASH 2013-55 FPDS-NG Change Management Notice for the Oklahoma  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 FPDS-NG Change Management Notice for the 5 FPDS-NG Change Management Notice for the Oklahoma Tornado and Storm POLICY FLASH 2013-55 FPDS-NG Change Management Notice for the Oklahoma Tornado and Storm This Flash will be available online at the following website: http://energy.gov/management/office-management/operational-management/procurement-and-acquisition/policy-flashes Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at Kevin.M.Smith@hq.doe.gov, or at (202) 287-1614. Policy Flash 2013-55_Oklahoma Tornado FPDS.pdf More Documents & Publications Policy Flash 2013-47 Management and Security of Personally Identifiable Information POlicy Flash 2013-60 Policy Flash 2013-74 Quarterly Notification of the DOE's Differing

243

Policy Flash 2014-03 Federal Acquisition Circular 2005-70 | Department...  

Energy Savers (EERE)

3 Federal Acquisition Circular 2005-70 Policy Flash 2014-03 Federal Acquisition Circular 2005-70 Questions concerning this policy flash should be directed to Barbara Binney, of the...

244

Policy Flash 2014-08 ACQUISITION LETTER 2014-02: PROVISIONAL...  

Energy Savers (EERE)

4-08 ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE Policy Flash 2014-08 ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE Questions concerning this policy flash...

245

Policy Flash 2015-02 INCREMENTALLY FUNDING FIXED-PRICE ACTIONS...  

Office of Environmental Management (EM)

5-02 INCREMENTALLY FUNDING FIXED-PRICE ACTIONS Policy Flash 2015-02 INCREMENTALLY FUNDING FIXED-PRICE ACTIONS Questions concerning this policy flash should be directed to Michael...

246

POLICY FLASH 2013-59 Class Deviation (FAR) 19.15, Women-Owned...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

POLICY FLASH 2013-59 Class Deviation (FAR) 19.15, Women-Owned Small Business (WOSB) Program POLICY FLASH 2013-59 Class Deviation (FAR) 19.15, Women-Owned Small Business (WOSB)...

247

Policy Flash 2014-10 Class Deviation DEAR 952.204-02 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10 Class Deviation DEAR 952.204-02 Policy Flash 2014-10 Class Deviation DEAR 952.204-02 Questions concerning this policy flash should be directed to Lawrence Butler, of the...

248

POLICY FLASH 2013-66 Revised Merit Review Guide for FInancail...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-66 Revised Merit Review Guide for FInancail Assistance, July 2013 POLICY FLASH 2013-66 Revised Merit Review Guide for FInancail Assistance, July 2013 Questions...

249

Policy Flash 2013-42 Acquisition Guide Chapter 19.1- Summary...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Policy Flash 2013-42 Acquisition Guide Chapter 19.1- Summary of Small Business Administration and Department of Energy Partnership Policy Flash 2013-42 Acquisition Guide Chapter...

250

Policy Flash 2013-76 Term Assignments of Contractors to the DC...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Term Assignments of Contractors to the DC Area Policy Flash 2013-76 Term Assignments of Contractors to the DC Area Questions concerning this policy flash should be directed to A...

251

Attached is Policy Flash 2013-34 Department of Energy Acquisition...  

Energy Savers (EERE)

Attached is Policy Flash 2013-34 Department of Energy Acquisition Letter 2013-04 on Executive Compensation Attached is Policy Flash 2013-34 Department of Energy Acquisition Letter...

252

Policy Flash 2014-22 Chart Supplement to Acquistion Guide | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

14-22 Chart Supplement to Acquistion Guide Policy Flash 2014-22 Chart Supplement to Acquistion Guide Questions concerning this policy flash should be directed to Michael Righi of...

253

POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25 Revision to the Procurement Strategy Panel (PSP) Briefing Process POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel (PSP) Briefing Process POLICY FLASH 2014-25...

254

Policy Flash 2013-32 Fiscal Year 2013 Small Business Contracting...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Fiscal Year 2013 Small Business Contracting Goals Policy Flash 2013-32 Fiscal Year 2013 Small Business Contracting Goals Attached is Policy Flash 2013-32 Fiscal Year 2013 Small...

255

Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES FOR SECTION H Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES FOR SECTION H Policy Flash - AL...

256

Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES FOR SECTION H Policy Flash 2013-71 AL 2013-11 NON M&O CONTRACTOR BUSINESS SYSTEMS CLAUSES FOR SECTION H Policy Flash - AL...

257

Policy Flash 2013-51 311 Notice Aquisition Letter 2013-05 Financial...  

Energy Savers (EERE)

or at (202) 287-1340 Policy Flash 2013-51.pdf Policy Flash 2013- Attachment AL 2013-05 FAL 2013-03 April 24 2013 final.pdf Attachment 1 DOE Section 311 Contract Award...

258

Policy Flash 2013-39 Acquisition Guide, Chapter 42.15, Contractor...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Acquisition Guide, Chapter 42.15, Contractor Performance Information Policy Flash 2013-39 Acquisition Guide, Chapter 42.15, Contractor Performance Information Attached is Policy...

259

Attached is Policy Flash 2013-35 Acquisition Guide Chapter 43...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Modifications Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at (202) 287-1614, or at...

260

Policy Flash 2013-46 Awardee in STRIPES | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Awardee in STRIPES 6 Awardee in STRIPES Policy Flash 2013-46 Awardee in STRIPES Attached is Policy Flash 2013-46 Awardee in STRIPES This Flash will be available online at the following website: http://energy.gov/management/office-management/operational-management/procurement-and-acquisition/policy-flashes. Questions concerning this policy flash should be directed to Ellen Colligan at (202) 287-1776 or ellen.colligan@hq.doe.gov of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management. Policy Flash 2013-46.pdf FAADS FAADS Plus dollar amounts.pdf Awardee Share Procedures.pdf asst agreement form from STRIPES.pdf More Documents & Publications Policy Flash 2013-36 Update to Congressional Notifications - Acquisition

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Policy Flash 2013-51 311 Notice Aquisition Letter 2013-05 Financial  

NLE Websites -- All DOE Office Websites (Extended Search)

Policy Flash 2013-51 311 Notice Aquisition Letter 2013-05 Financial Policy Flash 2013-51 311 Notice Aquisition Letter 2013-05 Financial Assistance Letter 2013-03 Policy Flash 2013-51 311 Notice Aquisition Letter 2013-05 Financial Assistance Letter 2013-03 Questions concerning this policy flash should be directed to Barbara Binney of the Contract and Financial Assistance Policy Division, at Barbara Binney@hq.doe.gov or at (202) 287-1340 Policy Flash 2013-51.pdf Policy Flash 2013- Attachment AL 2013-05 FAL 2013-03 April 24 2013 final.pdf Attachment 1 DOE Section 311 Contract Award letter FY2013 April 26.pdf Attachment 2A DOE Section 311 Financial Assistance Letter FY2013 April 26.pdf Attachment 2B DOE Section 311 Financial Assistance Letter FY2013 April 26.pdf More Documents & Publications Policy Flash 2014-04 Continuing Appropriations Act, 2014 -- Congressional

262

Microsoft Word - POLICY FLASH version 2 1.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2009-74 POLICY FLASH 2009-74 DATE: September 21, 2009 TO: Procurement Directors FROM: Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: Update to the DOE Implementation Guide for the American Recovery and Reinvestment Act (ARRA) of 2009 SUMMARY: As previously stated, the subject Guide is intended to be a "living document" that will be periodically updated, as necessary. This current update includes additional information in multiple parts of the Guide, and as such, the Guide is being reissued, in its entirety, as Version 2.1. In particular, Version 2.1 includes new information on reporting, amended conflicts of interest guidance relating to merit review, and Buy American requirements. Sections that are

263

Policy Flashes for FY 2011 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for FY 2011 for FY 2011 Policy Flashes for FY 2011 Archive of Policy Flashes issued in FY 2011. Number Topic 2011-104 Sources for Office Supplies 2011-103 Consent to Subcontracts on Management and Operating (M&O) Contracts. 2011-102 Guide Chapter 70.7 Subcontract Management-For Commercial Items & Services under $100,000. 2011-101 OFPP Policy Letter 11-01, Performance of Inherently Governmental and Critical Functions 2011-100 DOE O 227.1, Independent Oversight Program and DOE O 232.2, Occurence Reporting and Processing of Operations Information. 2011-99 Acquisition Career Management Handbook Change (Chapter 4 - FAP-C (Contracting Officer Warrant Requirements - Technology Investment Agreements) 2011-98 Class Deviation addressing Buy American Act requirements in Department of Energy Acquisition Regulation (DEAR) 970.5244-1, Contractor Purchasing System

264

Policy Flash 2013-25 Acquisition Certifications Program Handbook 3rd  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Flash 2013-25 Acquisition Certifications Program Handbook Policy Flash 2013-25 Acquisition Certifications Program Handbook 3rd Edition released Policy Flash 2013-25 Acquisition Certifications Program Handbook 3rd Edition released Attached is Policy Flash 2013-25 Acquisition Certifications Program Handbook 3rd Edition released The Handbook is available online at the following website: http://energy.gov/management/downloads/acquisition-certifications-program-handbook Questions concerning this policy flash should be directed to Linda Ott of the Office of Acquisition and Project Management, Professional Development Division, at (202) 287-5310 or at linda.ott@hq.doe.gov. Policy Flash 2013_25 AMCP Handbook 3rd Edition Released.pdf More Documents & Publications Policy Flash 2013-54 Acquisition Certification Program Handbook 4th Edition

265

Policy Flash 2013-31 Class Deviation from the Federal Acquisition  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Class Deviation from the Federal Acquisition 1 Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, Test Program for Certain Commercial Items Policy Flash 2013-31 Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, Test Program for Certain Commercial Items Attached is Policy Flash 2013-31 Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, Test Program for Certain Commercial Items Questions concerning this policy flash should be directed to Richard Bonnell of the Contract and Financial Assistance Policy Division at (202) 287-1747 or at richard.bonnell@hq.doe.gov. Flash 2013-31 Class Deviation FAR 13 5 (2-25).pdf Signed_Class Deviation.pdf More Documents & Publications Policy Flash 2013-01 Policy Flashes FY 2013 Policy Flash 2013-66 Revised Merit Review Guide for Financial Assistance,

266

Policy Flash 2012-22 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Policy Flash 2012-22 Attached is Policy Flash 2012-22 - Acquisition Letter AL 2012-07/Financial Acquisition Letter FAL 2012-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in Excess of $1 Million AL 2012-07/FAL 2012-01 (AL/FAL) implements statutory Congressional notification of pending award of a contract action, announcement of selected applications for negotiation of financial assistance awards, or to award a financial assistance action in excess of $1 million. The total value of the award includes options, budget periods and cost share. The AL/FAL implements Division B, Consolidated Appropriations Act, Fiscal Year

267

Policy Flash 2013-1 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Policy Flash 2013-1 POLICY FLASH 2013-01 Continuing Appropriations Resolution, 2013 -- Implementation of Division B, Title III, Title V and Division C Title VII, Consolidated Appropriations Act, 2012, Pub. L. No.112-74 and Related Conference Report Section 101(a)(4) of the Continuing Appropriations Resolution, 2013, Pub. L No. 112-175, makes appropriations available through March 27, 2013 for continuing projects or activities that were conducted under Consolidated Appropriations Act, 2012, Pub. L. No.112-74, under the same authority and conditions. Section 104 provides that no appropriation under the continuing resolution shall be used to initiate or resume any project or activity for which appropriations, funds, or other authority were not available during

268

Policy Flash 2013-2 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Flash 2013-2 POLICY FLASH 2013-02 Continuing Appropriations Resolution, 2013 -- Congressional Notification of Pending Contract or Financial Assistance Actions in excess of $1 Million under the Continuing Resolution Section 101(a)(4) of the Continuing Appropriations Resolution Act, 2013, Pub. L No. 112-175, makes appropriations available through March 27, 2013 for continuing projects or activities that were conducted under Consolidated Appropriations Act, 2012, Pub. L. No.112-74, under the same authority and conditions. Therefore, the Section 311 Congressional Notice requirements will continue as established in Acquisition Letter/Financial Acquisition Letter (AL/FAL) AL 2012- 07/FAL 2011-01 Congressional Notification of Pending Contract or Financial Assistance Actions in excess

269

Policy Flash 2011-74 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

74 74 Policy Flash 2011-74 Acquisition Letter AL 2011-05/Financial Acquisition Letter FAL 2011-01 Congressional Notification of Pending Award of a Contract Action, Announcement of Selected Applications for Negotiation of Financial Assistance Awards, or to Award a Financial Assistance Action in excess of $1 Million Policy Flash 2011-74 Attachment - AL 2011-05 - Congressional Notification of Pending Contract or Financial Assistance Actions in excess of $1 Million Attachment 1 - Section 311 Notification of Pending Contract Action Attachment 2A - Section 311 Notification of Pending Public announcement of Selection of Applications for Negotiation of Financial Assistance Awards Attachment 2B - Section 311 Notification to Make a Non-competitive Financial Assistance Award

270

Policy Flash 2013-32 Fiscal Year 2013 Small Business Contracting Goals |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Fiscal Year 2013 Small Business Contracting 2 Fiscal Year 2013 Small Business Contracting Goals Policy Flash 2013-32 Fiscal Year 2013 Small Business Contracting Goals Attached is Policy Flash 2013-32 Fiscal Year 2013 Small Business Contracting Goals Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe.gov. Policy Flash for SBA Goaling_FY13.pdf Attch_SBA FY13 Small Business Goaling Ltr Jan24_2013.pdf More Documents & Publications Policy Flash 2013-79 Professional and Consultant service cost (FAR 31.205-33) Policy Flash 2013-42 Acquisition Guide Chapter 19.1- Summary of Small Business Administration and Department of Energy Partnership

271

Policy Flash 2013-68 Acquisition Guide 42.101 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Flash 2013-68 Acquisition Guide 42.101 Policy Flash 2013-68 Acquisition Guide 42.101 Policy Flash 2013-68 Acquisition Guide 42.101 Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at (202) 287-1337 or at Michael.Righi@hq.doe.gov POLICY_FLASH_for Acquisition Guiide Chapter on Audit Requirements for non MO contracts.pdf ninth version of Audit Guide Chapter of April 2013--incorporating field comments -FINAL.pdf More Documents & Publications Chapter 42 - Contract Administration Attached is Policy Flash 2013-44 Acquisition Guide- Allowability of Incurred Costs 2014-02 Acquistion Letter 2014-01: Management and Operating Contractors' Audit Coverage of Cost-Reimbursement Subcontracts

272

Policy FLash 2014-21AL 2014-04 and FAL 2014-01 Implementation...  

Energy Savers (EERE)

FLash 2014-21AL 2014-04 and FAL 2014-01 Implementation of Division D, Titles III and V, and Division E, Title VII of the Consolidated Appropriations Act, 2014, Policy FLash...

273

Policy Flash 2014-09 Class Deviation from the Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 Class Deviation from the Department of Energy 09 Class Deviation from the Department of Energy Acquisition Regulation (DEAR) 952.204-2, Security Requirements Policy Flash 2014-09 Class Deviation from the Department of Energy Acquisition Regulation (DEAR) 952.204-2, Security Requirements Questions concerning this policy flash should be directed to Lawrence Butler, of the Contract and Financial Assistance Policy Division at (202) 287-1945 or at lawrence.butler@hq.doe.gov. Policy Flash 13 Class Deviation(2) (3).pdf Signed Class Deviation DEAR 952 204-2.pdf More Documents & Publications Policy Flash 2014-09 Class Deviation from the Department of Energy Acquisition Regulation (DEAR) 952.204-2 Policy Flash 2014-10 Class Deviation DEAR 952.204-02 POLICY FLASH 2013-59 Class Deviation (FAR) 19.15, Women-Owned Small

274

Microsoft Word - POLICY FLASH reporting.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09-71 09-71 DATE: September 3, 2009 TO: Procurement Directors FROM: Office of Procurement and Assistance Policy, MA-61 Office of Procurement and Assistance Management SUBJECT: FederalReporting.gov Registration for Recipient Reporting for Awards Funded by the American Recovery and Reinvestment Act of 2009 (ARRA) SUMMARY: Section 1512 of ARRA requires recipient reporting of job creation and retention along with basic award information for all contracts, grants, cooperative agreements and loan guarantees funded in whole or in part with ARRA dollars. Reporting will be done by recipients entering the required data elements through an electronic portal at www.FederalReporting.gov. The first report is due no later than October 10, 2009.

275

Policy FLash 2013-72 Acqusition Guide 43.2 Change Order ADministration  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at...

276

Policy Flash 2013-31 Class Deviation from the Federal Acquisition  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 Class Deviation from the Federal Acquisition 31 Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, Test Program for Certain Commercial Items Policy Flash 2013-31 Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, Test Program for Certain Commercial Items Attached is Policy Flash 2013-31 Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, Test Program for Certain Commercial Items Questions concerning this policy flash should be directed to Richard Bonnell of the Contract and Financial Assistance Policy Division at (202) 287-1747 or at richard.bonnell@hq.doe.gov. Flash 2013-31 Class Deviation FAR 13 5 (2-25).pdf Signed_Class Deviation.pdf More Documents & Publications Policy Flash 2013-01 Policy Flash 2013-66 Revised Merit Review Guide for Financial Assistance,

277

Policy Flash 2013-49 Updating Reporting Requirement Checklist including the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Flash 2013-49 Updating Reporting Requirement Checklist Policy Flash 2013-49 Updating Reporting Requirement Checklist including the research performance progress report Policy Flash 2013-49 Updating Reporting Requirement Checklist including the research performance progress report Questions concerning this policy flash should be directed to Ellen Colligan, of the Contract and Financial Assistance Policy Division, Office of Contract Management, Office of Acquisition and Project Management at (202) 287-1776, Ellen.colligan@hq.doe.gov Policy Flash 2013-49.pdf Attch_FA_RepReqChecklist_COMBINED_FINAL_4-23-13 (3).pdf More Documents & Publications ATTACHMENT FLASH 2011-46(6) Federal Assistance Reporting Checklist and Instructions for Projects Federal Assistance Reporting Checklist and Instructions for RD&D Projects

278

Policy Flash 2014-35 Rescission of American Recovery and Reinvestment...  

Energy Savers (EERE)

of American Recovery and Reinvestment Act Reporting Requirements. Policy Flash 2014-35 Rescission of American Recovery and Reinvestment Act Reporting Requirements. For DOE...

279

Policy Flash 2013-64 Acquisition Letter 10 and Class Deviation...  

Office of Environmental Management (EM)

4 Acquisition Letter 10 and Class Deviation for Nondisplacement of Qualified Workers Policy Flash 2013-64 Acquisition Letter 10 and Class Deviation for Nondisplacement of Qualified...

280

Policy Flash 2013-66 Revised Merit Review Guide for Financial...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

66 Revised Merit Review Guide for Financial Assistance, JULY 2013 Policy Flash 2013-66 Revised Merit Review Guide for Financial Assistance, JULY 2013 Questions concerning this...

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel...  

Office of Environmental Management (EM)

5 Revision to the Procurement Strategy Panel (PSP) Briefing Process POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel (PSP) Briefing Process For DOE questions...

282

Policy Flash 2014-09 Class Deviation from the Department of Energy...  

Office of Environmental Management (EM)

, Security Requirements Policy Flash 2014-09 Class Deviation from the Department of Energy Acquisition Regulation (DEAR) 952.204-2, Security Requirements Questions concerning this...

283

Policy Flash 2014-35 Rescission of American Recovery and Reinvestment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 Rescission of American Recovery and Reinvestment Act Reporting Requirements. Policy Flash 2014-35 Rescission of American Recovery and Reinvestment Act Reporting Requirements. For...

284

POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Business Systems Clauses for Section H - Earned Value Management Clause POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non-Management and Operating...

285

Policy Flash 2013-73 Utlization of GSA Federal Strategic Sourcing...  

Energy Savers (EERE)

for Office Supplies Questions concerning this policy flash should be directed to Rose Johnson of the Strategic Programs Division, Office of Contract Management at (202) 287-1552...

286

POLICY FLASH 2014-25 Revision to the Procurement Strategy Panel (PSP) Briefing Process  

Energy.gov (U.S. Department of Energy (DOE))

For DOE questions concerning the policy flash or the revised Acquisition Guide, please contact Sangok Shin at (202) 287-1474 or sangok.shin@hq.doe.gov.

287

Policy Flash 2014-13 AL 2014-03: Allowability of Contractor Litigation Defense and Settlement Costs  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at ...

288

POLICY FLASH 2014-16 In September 2012, DOE issued Policy Flash 2012-67, Acquisition Savings Reporting Template Guidance to fully comply with reporting requirements. This is an update to that Policy Flash.  

Energy.gov (U.S. Department of Energy (DOE))

            Questions concerning this Policy Flash should be directed to Scott Clemons of the Strategic Programs Division, Office of Contract Management, at (202) 287-1554 or at Scott.Clemons@hq...

289

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Fee Determinations: Requirement to Obtain 4 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Attached is Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input. Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at (202) 287-1337 or at Michael.Righi@hq.doe.gov. POLICY_FLASH_2013-24 disseminating the Dep Sec's memo of Jan 28 2013 on Fee Determ and AEs.pdf Fee Determinations - Requirement to Obtain Acquisition Executive's Input.pdf More Documents & Publications Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule

290

Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 Fee Determinations: Requirement to Obtain 4 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input Attached is Policy Flash 2013-24 Fee Determinations: Requirement to Obtain Acquisition Executive's Input. Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at (202) 287-1337 or at Michael.Righi@hq.doe.gov. POLICY_FLASH_2013-24 disseminating the Dep Sec's memo of Jan 28 2013 on Fee Determ and AEs.pdf Fee Determinations - Requirement to Obtain Acquisition Executive's Input.pdf More Documents & Publications Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule

291

Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Questions concerning this policy flash should be directed to Robert M. Myers, Director, Contractor Human Resources Policy Division (MA-612) at (202) 287-1584 or robert.myers@hq.doe.gov. Policy Flash - DOE O 350 1.pdf Consolidated Model H-Clause 06-27-13.pdf Acquisition Letter - DOE O 350 1 6-27-13.pdf More Documents & Publications GAO-04-539 Department of Energy: Certain Postretirement Benefits for Contractor Employees Are Unfunded and Program Oversight Could Be Improved Chapter 30 - Cost Accounting Standards Administration

292

Policy Flash 2013-39 Acquisition Guide, Chapter 42.15, Contractor  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Acquisition Guide, Chapter 42.15, Contractor 9 Acquisition Guide, Chapter 42.15, Contractor Performance Information Policy Flash 2013-39 Acquisition Guide, Chapter 42.15, Contractor Performance Information Attached is Policy Flash 2013-39 Acquisition Guide, Chapter 42.15, Contractor Performance Information Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management Policy at (202) 287-1340 or at Barbara.Binney@hq.doe.gov. Policy Flash AG chapter 4215.pdf AcqGuide42pt15 March 2013.pdf AcqGuide42pt15 attachment March 2013 ratings and narratives.pdf More Documents & Publications Policy Flash 2013-70 Acqusition Guides 42.15 Contractor Performance Infromation and 42.16 reporting Other Contractor Performance into Federal Awardee Performance and Integrity Infromation Systems (FAPIIS)

293

Policy FLash 2014-07 Recent State Initiatives on “Recreational” Marijuana use  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Jacqueline D. Rogers of the Office of Worker Safety & Health Policy on 202-586-4714, or by e-mail at jackie.rogers@hq.doe.gov

294

Policy Flash 2014-11 Federal Acquisition Circular (FAC) 2005-71  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management Policy at (202) 287-1340 or at Barbara.Binney@hq.doe.gov.

295

POLICY FLASH 2014-15 Determination of Benchmark Compensation Amount for Certain Executives and Employees  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Carol Jenkins, of the Office of Acquisition and Project Management Policy at 202-287-1827 or at Carol.Jenkins@hq.doe.gov.

296

POLICY FLASH 2014-15 Determination of Benchmark Compensation Amount for Certain Executives and Employees (Update)  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Carol Jenkins, of the Office of Acquisition and Project Management Policy at 202-287-1827 or at Carol.Jenkins@hq.doe.gov.

297

Policy Flash 2014-29 Acquisition Letter 07- Benchmark Compensation Amount for Individual Executive Salary Actions  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Joel Gonzalez, Industrial Relations Specialist, Contractor Human Resources Policy Division (MA-612) at (202) 287-1752 or joel.gonzalez...

298

Policy Flash 2014-38 Federal Acquisition Circular (FAC) 2005-76  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Jason Taylor, of the Contract and Financial Assistance Policy Division at (202) 287-1560 or at Jason.Taylor@hq.doe.gov

299

Policy Flash 2013-21 Change to Procurement Evaluation & Re-Engineering...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Change to Procurement Evaluation & Re-Engineering Team (PERT) Review Cycle Policy Flash 2013-21 Change to Procurement Evaluation & Re-Engineering Team (PERT) Review Cycle Policy...

300

POLICY FLASH 2013-66 Revised Merit Review Guide for FInancail Assistance, July 2013  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Richard Bonnell of the Contract and Financial Assistance Policy Division at 202-287-1747 or at richard.bonnell@hq.doe.gov

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Policy Flash 2013-63 Federal Acquisition Circular (FAC) 2005-67  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management Policy at (202) 287-1340 or at Barbara.Binney@hq.doe.gov.  

302

POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition Procedures  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Carol Jenkins, of the Office of Acquisition and Project Management Policy at 202-287-1827 or at Carol.Jenkins@hq.doe.gov

303

Policy Flash 2013-75 Federal Acquisition Circular 2005-69  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management Policy at (202) 287-1340 or at Barbara.Binney@hq.doe.gov.

304

Policy Flash 2014-30 DOE Order 412.1a, Work Authorization System Administrative Change  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Mike Dombrowski, of the Office of Acquisition and Project Management Policy at 202-287-1828 or at michael.dombrowski@hq.doe.gov.

305

Policy Flash 2013-66 Revised Merit Review Guide for Financial Assistance, JULY 2013  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Richard Bonnell of the Contract and Financial Assistance Policy Division at 202-287-1747 or at richard.bonnell@hq.doe.gov

306

Policy Flash 2014-28 Updated Class Deviation for FAR 52.209-5...  

Energy Savers (EERE)

Matters Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at Kevin.M.Smith@hq.doe.gov...

307

Policy Flash 2013-48 OMB memorandum M-13-10, Antideficiency Act...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agreements Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at Kevin.M.Smith@hq.doe.gov...

308

Policy Flash 2013-74 Quarterly Notification of the DOE's Differing...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Opinion Process Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at Kevin.M.Smith@hq.doe.gov...

309

Policy Flash 2013-47 Management and Security of Personally Identifiabl...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at Kevin.M.Smith@hq.doe.gov...

310

Policy Flash 2013-70 Acqusition Guides 42.15 Contractor Performance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Flash 2013-70 Acqusition Guides 42.15 Contractor Performance Policy Flash 2013-70 Acqusition Guides 42.15 Contractor Performance Infromation and 42.16 reporting Other Contractor Performance into Federal Awardee Performance and Integrity Infromation Systems (FAPIIS) Policy Flash 2013-70 Acqusition Guides 42.15 Contractor Performance Infromation and 42.16 reporting Other Contractor Performance into Federal Awardee Performance and Integrity Infromation Systems (FAPIIS) Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management Policy at (202) 287-1340 or at Barbara.Binney@hq.doe.gov. Flash AG chapter 4215 final.pdf AcqGuide42pt15 August 1 2013.pdf AcqGuide42pt FAPIIS August 1 2013.pdf More Documents & Publications Contractor Past Performance Information

311

Policy Flash 2013-33 Department of Energy Order 206.2 Identity, Credential and Access Managment (ICAM)  

Energy.gov (U.S. Department of Energy (DOE))

Attached is Policy Flash 2013-33 Department of Energy Order 206.2 Identity, Credential and Access Managment (ICAM)

312

Attached is Policy Flash 2013-34 Department of Energy Acquisition Letter 2013-04 on Executive Compensation  

Energy.gov (U.S. Department of Energy (DOE))

Attached is Policy Flash 2013-34 Department of Energy Acquisition Letter 2013-04 on Executive Compensation           

313

Policy Flash 2013-28 Implementation of Indian Energy Preference Provision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Implementation of Indian Energy Preference 8 Implementation of Indian Energy Preference Provision in EP Act 2005 and Acquisition Letter 2013-02 Policy Flash 2013-28 Implementation of Indian Energy Preference Provision in EP Act 2005 and Acquisition Letter 2013-02 Attached is Policy Flash 2013-28 Implementation of Indian Energy Preference Provision in EP Act 2005 and Acquisition Letter 2013-02 Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1945 or at jason.taylor@hq.doe.gov. Policy Flash for Indian Energy Preference (2).pdf AL 02 01 13 (2).pdf Attch_Secretarial Decision Memo_ Indian Energy Preference.pdf Attch_Secretarial Policy Memo.pdf More Documents & Publications

314

Policy Flash 2011-96 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-96 1-96 Policy Flash 2011-96 Request for Proposals (RFP) Section H Clause Templates Issues the final versions of the following sixteen RFP Section H clause templates: 1) COMPLIANCE WITH INTERNET PROTOCOL VERSION 6 (IPV6) IN ACQUIRING INFORMATION TECHNOLOGY, 2) CONTRACTOR ACCEPTANCE OF NOTICES OF VIOLATION OR ALLEGED VIOLATIONS, FINES, AND PENALTIES, 3) ASSIGNMENT AND ADMINISTRATION OF CONTRACTS AND SUBCONTRACTS, 4) SMALL BUSINESS SUBCONTRACTING PLAN, 5) MATERIAL SAFETY DATA SHEET AVAILABILITY, 6) PARENT ORGANIZATION SUPPORT, 7) KEY PERSONNEL, 8) SEPARATE CORPORATE ENTITY, 9) PERFORMANCE GUARANTEE AGREEMENT, 10) RESPONSIBLE CORPORATE OFFICIAL, 11) PRIVACY ACT SYSTEM OF RECORDS, 12) DISPOSITION OF INTELLECTUAL PROPERTY - FAILURE TO COMPLETE CONTRACT PERFORMANCE, 13) PRICE-ANDERSON AMENDMENTS ACT NONCOMPLIANCE, 14)

315

OPAM Policy Acquisition Guides | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17 - Special Contracting Methods Acquisition Letter 2009-03 Acquisition Planning-Extending A Management and Operating Contract Without Full and Open Competition and Site and...

316

OPAM Policy Acquisition Guides | Department of Energy  

Energy Savers (EERE)

Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate Chapter 17 - Special Contracting Methods...

317

OPAM Policy Acquisition Guides | Department of Energy  

Office of Environmental Management (EM)

2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating...

318

Policy Flash 2013-26 Guidance for tracking inquiries related to the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 Guidance for tracking inquiries related to the 6 Guidance for tracking inquiries related to the licensing of inventions developed at DOE facilities Policy Flash 2013-26 Guidance for tracking inquiries related to the licensing of inventions developed at DOE facilities Attached is Policy Flash 2013-26 Guidance for tracking inquiries related to the licensing of inventions developed at DOE facilities Questions concerning this policy flash should be directed to Karina Edmonds, Technology Transfer Coordinator, at (202) 586-2678 or at karina.edmonds@hq.doe.gov. Flash 2013-26 Guidance for tracking inquires on licensing 1-30.pdf Attch_Guidance for Tracking Inquiries RE Licensing of DOE Inventions.pdf More Documents & Publications Policy Flashes FY 2013 TT Coordinator Ltr dated May 13 2010 Microsoft Word - TT Coordinator Letter dated May 13 2010.docx

319

Policy Flash 2013-68 Acquisition Guide 42.101 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Acquisition Guide 42.101 8 Acquisition Guide 42.101 Policy Flash 2013-68 Acquisition Guide 42.101 Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at (202) 287-1337 or at Michael.Righi@hq.doe.gov POLICY_FLASH_for Acquisition Guiide Chapter on Audit Requirements for non MO contracts.pdf ninth version of Audit Guide Chapter of April 2013--incorporating field comments -FINAL.pdf More Documents & Publications Chapter 42 - Contract Administration 2014-02 Acquistion Letter 2014-01: Management and Operating Contractors' Audit Coverage of Cost-Reimbursement Subcontracts Attached is Policy Flash 2013-44 Acquisition Guide- Allowability of Incurred Costs

320

Policy Flash 2013-53 Implementation of Division F, Title I, II, III AL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Flash 2013-53 Implementation of Division F, Title I, II, III Flash 2013-53 Implementation of Division F, Title I, II, III AL 2013-06 and FAL 2013-04 Policy Flash 2013-53 Implementation of Division F, Title I, II, III AL 2013-06 and FAL 2013-04 Questions concerning conference spending, should be directed to Jason Taylor at 202-287-1560 or jason.taylor@hq.doe.gov For DOE question concerning the policy flash should be directed to Barbara Binney at 202-287-1340 or barbara.binney@hq.doe.gov for the AL or Richard Bonnell at 202-287-1747 or at richard.bonnell@hq.doe.gov for the FAL. For NNSA questions concerning the policy flash should be directed NNSA by contacting 202-586-6681 Policy Flash 2013-53 FY 2013 appropriations.pdf AL 2013-06 FY 2013 appro.pdf FAL 2013 - 04 FY13 Approp.pdf More Documents & Publications Policy Flash 2014-05 Continuing Appropriations Act, 2014 -- Implementation

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Policy Flash 2013-70 Acqusition Guides 42.15 Contractor Performance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Acqusition Guides 42.15 Contractor Performance 0 Acqusition Guides 42.15 Contractor Performance Infromation and 42.16 reporting Other Contractor Performance into Federal Awardee Performance and Integrity Infromation Systems (FAPIIS) Policy Flash 2013-70 Acqusition Guides 42.15 Contractor Performance Infromation and 42.16 reporting Other Contractor Performance into Federal Awardee Performance and Integrity Infromation Systems (FAPIIS) Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management Policy at (202) 287-1340 or at Barbara.Binney@hq.doe.gov. Flash AG chapter 4215 final.pdf AcqGuide42pt15 August 1 2013.pdf AcqGuide42pt FAPIIS August 1 2013.pdf More Documents & Publications Policy Flash 2013-77 Contractor Performance Information

322

Policy Flash 2013-38 Revised Merit Review Guide For Financial Assistance |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 Revised Merit Review Guide For Financial 8 Revised Merit Review Guide For Financial Assistance Policy Flash 2013-38 Revised Merit Review Guide For Financial Assistance Attached is Policy Flash 2013-38 Revised Merit Review Guide for Financial Assistance Questions concerning this policy flash should be directed to Richard Bonnell of the Contract and Financial Assistance Policy Division at (202) 287-1747 or at richard.bonnell@hq.doe.gov. Flash 2013-38 Revisions to the Merit Review Guide 2013.pdf Merit Review Guide FINAL JULY 2013 ATTACHMENT 1 Sample Merit Rev Panel Appt Letter 1-10.docx ATTACHMENT 2 Sample COI ADDED WB LANGUAGE JULY 2013.docx ATTACHMENT 3 - Sample Evaluation and Selection Plan JULY 2013.docx ATTACHMENT 4 Sample Noncompetitive Review Plan.docx ATTACHMENT 5 Sample Initial Compliance Review 1-16.docx

323

Policy Flash 2014-39 Initiatives to Achieve Strategic Plan 2014...  

Energy Savers (EERE)

2014-39 Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused on Cost Savings Policy Flash 2014-39 Initiatives to Achieve Strategic Plan 2014-2018...

324

POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non...  

Energy Savers (EERE)

Business Systems Clauses for Section H - Earned Value Management Clause POLICY FLASH 2014-17 Revised Acquisition Letter 2013-11- Non-Management and Operating (Non-M&O)...

325

Policy Flash 2014-01 Acquisition Guide 15.4-3 Negotiation Documentatio...  

Energy Savers (EERE)

1 Acquisition Guide 15.4-3 Negotiation Documentation: Pre-negotiation Plan & the Price Negotiation Memorandum Policy Flash 2014-01 Acquisition Guide 15.4-3 Negotiation...

326

Policy Flash 2014-01 Acquisition Guide 15.4-3 Negotiation Documentatio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2014-01 Acquisition Guide 15.4-3 Negotiation Documentation: Pre-negotiation Plan & the Price Negotiation Memorandum Policy Flash 2014-01 Acquisition Guide 15.4-3 Negotiation...

327

Policy Flash 2014-40 Implementation of DOE O 580.1A, DOE Energy...  

Energy Savers (EERE)

4-40 Implementation of DOE O 580.1A, DOE Energy Personal Property Management Policy Flash 2014-40 Implementation of DOE O 580.1A, DOE Energy Personal Property Management Questions...

328

Policy Flash 2013-33 Department of Energy Order 206.2 Identity...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Department of Energy Order 206.2 Identity, Credential and Access Managment (ICAM) Policy Flash 2013-33 Department of Energy Order 206.2 Identity, Credential and Access Managment...

329

Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Policy Flash 2013-62 Acquisition Letter 09 - Revision of Department of Energy (DOE) Order...

330

Policy Flash 2014-30 DOE Order 412.1a, Work Authorization System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 DOE Order 412.1a, Work Authorization System Administrative Change Policy Flash 2014-30 DOE Order 412.1a, Work Authorization System Administrative Change Questions concerning this...

331

Policy Flash 2015-08 One Acquisiton Solution for Services (OASIS)  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Chris Greene of the Strategic Programs Division, Office of Contract Management, at (202) 287-1719 or at  Christopher.Greene@hq.doe.gov.

332

Policy Flash 2013-31 Class Deviation from the Federal Acquisition...  

Office of Environmental Management (EM)

3-31 Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, Test Program for Certain Commercial Items Policy Flash 2013-31 Class Deviation from the Federal Acquisition...

333

Policy Flash 2014-13 AL 2014-03: Allowability of Contractor Litigation...  

Office of Environmental Management (EM)

13 AL 2014-03: Allowability of Contractor Litigation Defense and Settlement Costs Policy Flash 2014-13 AL 2014-03: Allowability of Contractor Litigation Defense and Settlement...

334

Policy Flash 2014-27 Implementation of Division D, Titles III...  

Office of Environmental Management (EM)

Division E, Title VII of the Consolidated Appropriations Act, 2014,Pub. L. No. 113-76. (AL) 2014-04 and (FAL) 2014-01 revised Policy Flash 2014-27 Implementation of Division D,...

335

Policy Flash 2015-10 Announcing Award of General Services Administration Federal  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Chris Greene of the Strategic Programs Division, Office of Contract Management, at (202) 287-1719 or at Christopher.Greene@hq.doe.gov.

336

Policy Flash 2013-53 Implementation of Division F, Title I, II, III AL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Policy Flash 2013-53 Implementation of Division F, Title I, II, III Policy Flash 2013-53 Implementation of Division F, Title I, II, III AL 2013-06 and FAL 2013-04 Policy Flash 2013-53 Implementation of Division F, Title I, II, III AL 2013-06 and FAL 2013-04 Questions concerning conference spending, should be directed to Jason Taylor at 202-287-1560 or jason.taylor@hq.doe.gov For DOE question concerning the policy flash should be directed to Barbara Binney at 202-287-1340 or barbara.binney@hq.doe.gov for the AL or Richard Bonnell at 202-287-1747 or at richard.bonnell@hq.doe.gov for the FAL. For NNSA questions concerning the policy flash should be directed NNSA by contacting 202-586-6681 Policy Flash 2013-53 FY 2013 appropriations.pdf AL 2013-06 FY 2013 appro.pdf FAL 2013 - 04 FY13 Approp.pdf More Documents & Publications

337

FLASH2011-25-OPAM | Department of Energy  

Office of Environmental Management (EM)

considerations for DOE contracts has been updated. The update recognizes the new Sustainable Acquisition Program clauses which became effective October 20, 2010 as a result of...

338

FLASH2011-11-OPAM | Department of Energy  

Energy Savers (EERE)

The attached "GC Guidance: Model Arbitration Provision" is issued for use by Contracting Officers for M&O contracts as needed. 2011-11 Attachment GC Guidance: Model...

339

Policy Flash 2013-78 Acquisition Guide Chapter 7.3 Acquisition Planning in the M&O Environment  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at...

340

Policy Flash 2012-17 | Department of Energy  

Office of Environmental Management (EM)

Flash 2012-17 The attached Acquisition Letter has been issued to provide guidance to Contracting Officers on the implications of time-limited funding on contract planning, award,...

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Policy Flash 2014-33 Revised Department of Energy (DOE) Acquisition Guide Chapter 7.2 Strategic Sourcing Requirements  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Mike Larson at 202-287-1426 or email at Michael.Larson@hq.doe.gov

342

Policy Flash 2014-04 Continuing Appropriations Act, 2014-- Congressional Notification of Pending Contract or Financial Assistance Actions  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Barbara Binney at (202) 287-1340 or barbara.binney@hq.doe.gov.

343

Policy Flash 2013-40 Acquisition Guide Chapter 43.3 - Maintaining  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Acquisition Guide Chapter 43.3 - Maintaining 0 Acquisition Guide Chapter 43.3 - Maintaining Alignment of Project Management with Contract Management of Non-Management and Operating (M&O) Cost Reimburstment Contracts Policy Flash 2013-40 Acquisition Guide Chapter 43.3 - Maintaining Alignment of Project Management with Contract Management of Non-Management and Operating (M&O) Cost Reimburstment Contracts Attached is Policy Flash 2013-40 Acquisition Guide Chapter 43.3 - Maintaining Alignment of Project Management with Contract Management of Non-Management and Operating (M&O) Cost Reimbursement Contracts for Capital Asset Projects, Environmental Remediation, Decontamination and Decommissioning, Facility Operations, and Other Major Projects Questions concerning this policy flash should be directed to Barbara Binney

344

Policy Flash 2014-28 Updated Class Deviation for FAR 52.209-5, Certifications Regarding Responsibility Matters  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at Kevin.M.Smith@hq.doe.gov , or at (202) 287-1614. 

345

Policy Flash 2014-26 Acquisition Guide Chapter 70.31A- Costs Associated with Whistleblower Actions  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Jason Taylor, of the Contract and Financial Assistance Policy Division at (202) 287-1560 or at Jason.Taylor@hq.doe.gov

346

POLICY FLASH 2013-59 Class Deviation (FAR) 19.15, Women-Owned Small Business (WOSB) Program  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Lawrence Butler, of the Contract and Financial Assistance Policy Division at (202) 287-1945 or at lawrence.butler@hq.doe.gov.

347

Policy Flash 2014-09 Class Deviation from the Department of Energy Acquisition Regulation (DEAR) 952.204-2  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Lawrence Butler, of the Contract and Financial Assistance Policy Division at (202) 287-1945 or at lawrence.butler@hq.doe.gov.

348

Policy Flash 2013-53 Implementation of Division F, Title I, II...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Implementation of Division F, Title I, II, III AL 2013-06 and FAL 2013-04 Policy Flash 2013-53 Implementation of Division F, Title I, II, III AL 2013-06 and FAL 2013-04 Questions...

349

Policy Flash 2014-39 Initiatives to Achieve Strategic Plan 2014-2018 Performance Goal Focused on Cost Savings  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Scott Clemons of the Strategic Programs Division, Office of Contract Management, at (202) 287-1554 or at Scott.Clemons@hq.doe.gov.

350

Policy Flash 2013-73 Utlization of GSA Federal Strategic Sourcing Initiative Blanket Purchase Agreements for Office Supplies  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Rose Johnson of the Strategic Programs Division, Office of Contract Management at (202) 287-1552 or at Rosemary.Johnson@hq.doe.gov.

351

Policy Flash 2013-22 Section 311 Revised Template January 24 2013 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Section 311 Revised Template January 24 2013 2 Section 311 Revised Template January 24 2013 Policy Flash 2013-22 Section 311 Revised Template January 24 2013 UPDATE: WORD VERISON OF ALL DOCUEMENTS ARE ATTACHED 311 Notice ALERT - EFFECTIVE IMMEDIATELY Please ensure all of your Contracting Officers are aware of the changes to the template. Attached are 3 revised templates for sending the Section 311 notices to Congress as prescribed in Acquisition Letter (AL) 2012-07 and Financial Assistance Letter (FAL) 2012-01. The template revises two subcommittee assignment addresses at the end of the letter. The revision changes The Ranking Member, formerly Thad Cochran, to The Honorable Richard C. Shelby and The Ranking Member, formerly Peter Visclosky, to The Honorable Marcy Kaptur. Policy flash 2013-22 Section 311 revised templateJan 24 2013.pdf

352

Policy Flash 2013-22 Section 311 Revised Template January 24 2013 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

22 Section 311 Revised Template January 24 2013 22 Section 311 Revised Template January 24 2013 Policy Flash 2013-22 Section 311 Revised Template January 24 2013 UPDATE: WORD VERISON OF ALL DOCUEMENTS ARE ATTACHED 311 Notice ALERT - EFFECTIVE IMMEDIATELY Please ensure all of your Contracting Officers are aware of the changes to the template. Attached are 3 revised templates for sending the Section 311 notices to Congress as prescribed in Acquisition Letter (AL) 2012-07 and Financial Assistance Letter (FAL) 2012-01. The template revises two subcommittee assignment addresses at the end of the letter. The revision changes The Ranking Member, formerly Thad Cochran, to The Honorable Richard C. Shelby and The Ranking Member, formerly Peter Visclosky, to The Honorable Marcy Kaptur. Policy flash 2013-22 Section 311 revised templateJan 24 2013.pdf

353

Policy Flash 2013-61 The Whistleblower Protection Enhancement Act of 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 The Whistleblower Protection Enhancement Act 1 The Whistleblower Protection Enhancement Act of 2012 and How It Affects Federal Employee Non-Disclosure Policies, Forms, Certificates, Agreements and Acknowledgments Policy Flash 2013-61 The Whistleblower Protection Enhancement Act of 2012 and How It Affects Federal Employee Non-Disclosure Policies, Forms, Certificates, Agreements and Acknowledgments For questions concerning the Whistleblower Protection Enhancement Act of 2012 or the April 24, 2013 DOECAST, contact Beth Kelly, Deputy Assistant General Counsel for Procurement and Financial Assistance at (202) 586-6906 or beth.kelly@hq.doe.gov. For DOE, contact Richard Bonnell of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1747 or richard.bonnell@hq.doe.gov; or for NNSA,

354

Microsoft Word - Policy Flash 2010-82 Attachment 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 New Subsections for FOA for DUNS/CCR and Subaward and Executive Reporting The new subsections are highlighted below. Section VI - AWARD ADMINISTRATION INFORMATION B. ADMINISTRATIVE AND NATIONAL POLICY REQUIREMENTS 1. Administrative Requirements The administrative requirements for DOE grants and cooperative agreements are contained in 10 CFR 600 (See: http://ecfr.gpoaccess.gov). Grants and cooperative agreements made to universities, non-profits and other entities subject to Title 2 CFR are subject to the Research Terms and Conditions located on the National Science Foundation web site at http://www.nsf.gov/bfa/dias/policy/rtc/index.jsp. DUNS and CCR Requirements Additional administrative requirements for DOE grants and cooperative agreements are contained in 2

356

Policy Flash 2013-28 Implementation of Indian Energy Preference Provision in EP Act 2005 and Acquisition Letter 2013-02  

Energy.gov (U.S. Department of Energy (DOE))

Attached is Policy Flash 2013-28 Implementation of Indian Energy Preference Provision in EP Act 2005 and Acquisition Letter 2013-02

357

Policy Flash 2013-48 OMB memorandum M-13-10, Antideficiency Act Implications of Certain Online Terms of Service Agreements  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Kevin M. Smith, of the Contract and Financial Assistance Policy Division, at Kevin.M.Smith@hq.doe.gov or at (202) 287-1614.

358

Policy Flash 2015-05 AL Letter 2015-02- Revision of DOE O 350.1 and Special H Clause  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Robert M. Myers, Director, Contractor Human Resources Policy Division (MA-612) at (202) 287-1584 or robert.myers@hq.doe.gov.

359

Policy Flash 2014-09 Class Deviation from the Department of Energy Acquisition Regulation (DEAR) 952.204-2, Security Requirements  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Lawrence Butler, of the Contract and Financial Assistance Policy Division at (202) 287-1945 or at lawrence.butler@hq.doe.gov.

360

Policy Flash 2013-65 Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Mike Larson of the Office of Acquisition and Project Management, Strategic Programs Division at (202) 287-1426 or at Michael.Larson@hq...

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Policy Flash 2014-01 Acquisition Guide 15.4-3 Negotiation Documentation: Pre-negotiation Plan & the Price Negotiation Memorandum  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Sandy Shin of the Field Assistance and Oversight Division, Office Acquisition and Project Management at (202) 287-1474 or at Sangok.Shin...

362

Policy Flash 2010-54 Guidance on Manufactured Goods and Substantial...  

Office of Environmental Management (EM)

More Documents & Publications Substantial Transformation Flash2010-54.pdf Questions and Answers for the Smart Grid Investment Grant Program: Frequently Asked Questions...

363

Policy Flash 2013-40 Acquisition Guide Chapter 43.3 - Maintaining...  

Energy Savers (EERE)

& Publications Chapter 43 - Contract Modifications DOE Acquisition and Project Management (APM) Glossary of Terms Handbook FINAL VERSION 9-30-2014 Flash2008-39attachment.pdf...

365

Policy Flash 2014-32 General Accountability Office Report (GAO) final report entitled National Laboratories: DOE needs to Improve Oversight of Work performed for non-DOE Entities (GAO 14_78 October 2013)  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Andrew Scott Geary, Office of Contract and Financial Assistance Policy in the Office of the Acquisition and Project management by phone...

366

Policy Flash 20 Acquisition Letter 2014-05/Financial Acquisition Letter 2014-02 Congressional Notifications and Quarterly Reporting to the Appropriations Committees Subject to Energy and Water Development and Related Agencies  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Barbara Binney of the Contract and Financial Assistance Policy Division, at Barbara.Binney@hq.doe.gov or at (202) 287-1340.

367

Policy Flash 2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts  

Energy.gov (U.S. Department of Energy (DOE))

Questions concerning this policy flash should be directed to Carol Jenkins, of the Office of Acquisition and Project Management Policy at 202-287-1827 or at Carol.Jenkins@hq.doe.gov.

368

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 22160 of 26,764 results. 51 - 22160 of 26,764 results. Download Microsoft Word- Policy_Flash_ 09_03_ACOR.doc http://energy.gov/management/downloads/microsoft-word-policyflash-0903acordoc Download Flash2011-39 OPAM http://energy.gov/management/downloads/flash2011-39-opam Download Flash2008-63.pdf http://energy.gov/management/downloads/flash2008-63pdf Download Flash_2010-15.pdf http://energy.gov/management/downloads/flash2010-15pdf Download Flash2010-68.pdf http://energy.gov/management/downloads/flash2010-68pdf Download Flash2011-65 OPAM http://energy.gov/management/downloads/flash2011-65-opam Download Flash2010-35.pdf http://energy.gov/management/downloads/flash2010-35pdf Download SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION 216 http://energy.gov/oe/downloads/summary-regulations-implementing-federal-power-act-section-216

369

Policy FLash 2014-21AL 2014-04 and FAL 2014-01 Implementation of Division D, Titles III and V, and Division E, Title VII of the Consolidated Appropriations Act, 2014,  

Energy.gov (U.S. Department of Energy (DOE))

For DOE questions concerning the policy flash or AL, please contact Jason Taylor at (202) 287-1560 or jason.taylor@hq.doe.gov  or Richard Bonnell at (202) 287-1747 or richard.bonnell@hq.doe.gov ...

370

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 24040 of 29,416 results. 31 - 24040 of 29,416 results. Download Aspen: Noncompliance Determination (2010-SE-0305) DOE issued a Notice of Noncompliance Determination to Aspen Manufacturing finding that a variety of basic models of split-system air conditioning heat pumps do not comport with the energy conservation standards. http://energy.gov/gc/downloads/aspen-noncompliance-determination-2010-se-0305 Download Flash2008-60.pdf http://energy.gov/management/downloads/flash2008-60pdf Download Flash2010-09.pdf http://energy.gov/management/downloads/flash2010-09pdf Download Policy Flash 2011-48 http://energy.gov/management/downloads/policy-flash-2011-48 Download FLASH2011-17-OPAM http://energy.gov/management/downloads/flash2011-17-opam Download FLASH2011-16-OPAM http://energy.gov/management/downloads/flash2011-16-opam

371

Attachment to Policy Flash on New Procedures for Submitting Clause or Template Changes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on New Procedures for Submitting Clause or Template on New Procedures for Submitting Clause or Template Changes The following are the new procedures for submitting requests to add new clauses or templates or to change existing clauses and templates (including local clauses and templates) in STRIPES: Note that we are not specifying a specific number of days for any step in the process until we have some statistics on how long this new process will take. ∗ Site Points of Contact (SPOCs) and Contract and Financial Assistance Policy Division (CFAPD) staff are the only individuals who can submit a request for a clause or template addition or revision to the STRIPES functional team. Requests from other than the SPOCs will not be reviewed. ∗ The new forms developed for the requests for clause and template additions or revisions

372

flash flood  

Science Journals Connector (OSTI)

flash flood [Context: The flash flood in the Big Thompson Canyon in Colorado on July 31,1976 killed 139 people]? flutartige Überschwemmung f, durch heftige Regenfälle ausgelöste Überschwemmung f ...

2014-08-01T23:59:59.000Z

373

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 25190 of 26,764 results. 81 - 25190 of 26,764 results. Download AcqGuide9.3-OPAM http://energy.gov/management/downloads/acqguide93-opam Download Flash2007-03Attachment.doc http://energy.gov/management/downloads/flash2007-03attachmentdoc0 Download PIA- WEB Unclassified Business Operations General Support System http://energy.gov/management/downloads/pia-web-unclassified-business-operations-general-support-system Download Microsoft Word- Policy Flash 2010-81 Attachment 1 http://energy.gov/management/downloads/microsoft-word-policy-flash-2010-81-attachment-1 Download OPAM Policy Acquisition Guides http://energy.gov/management/downloads/opam-policy-acquisition-guides-9 Download This message has been concurred and approved by the Director of the Emergency Operations Training Academy and by the Continuity Programs

374

Flash2008-39attachment.pdf | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Award Actions Microsoft PowerPoint - changeorders Policy Flash 2014-01 Acquisition Guide 15.4-3 Negotiation Documentation: Pre-negotiation Plan & the Price Negotiation Memorandum...

375

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 - 21670 of 28,905 results. 61 - 21670 of 28,905 results. Download Policy Flash 2011-47 OPAM http://energy.gov/management/downloads/policy-flash-2011-47-opam Download Flash2008-50.pdf http://energy.gov/management/downloads/flash2008-50pdf Download Flash2010-44.pdf http://energy.gov/management/downloads/flash2010-44pdf Download Purchaser Fee Payments to the Nuclear Waste Fund as of December 31, 2009 http://energy.gov/downloads/purchaser-fee-payments-nuclear-waste-fund-december-31-2009 Download Policy Flash 2011-86 http://energy.gov/management/downloads/policy-flash-2011-86 Download Policy Flash 2011-87 http://energy.gov/management/downloads/policy-flash-2011-87 Article Four Central Air Conditioners Determined Noncompliant With Energy Efficiency Standard The U.S. Department of Energy's Office of Enforcement issued a Notice of

376

Policies  

NLE Websites -- All DOE Office Websites (Extended Search)

Cleanroom Policies (All policies are in .pdf format) After Hours Access Policy Booking and Login Policy Cleanroom Policy Equipment Use Policy Two-Person Rule Cleanroom Chemical...

377

Microhole Arrays / FLASH  

Energy.gov (U.S. Department of Energy (DOE))

Microhole Arrays / FLASH presentation at the April 2013 peer review meeting held in Denver, Colorado.

378

Policy Flash 2012-62  

Energy Savers (EERE)

Office of Acquisition and Project Management SUBJECT: Class Deviation - DEAR 950.7006 AL 2012-10, Implementation of the Price-Anderson Amendments Act of 2005 SUMMARY: A class...

379

Policy Flash 2005-53  

Energy Savers (EERE)

Management SUBJECT: Acquisition Letters Remaining In Effect SUMMARY: Acquisition Letter (AL) 2012-01 has been issued. It lists ALs currently in effect and the discontinued ALs,...

380

Policy Flash 2005-53  

Office of Environmental Management (EM)

and Assistance Management SUBJECT: Interagency Acquisitions SUMMARY: Acquisition Letter (AL) 2011-03 has been updated to incorporate Federal Acquisition Circular (FAC) 2005-47...

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Double Flash | Open Energy Information  

Open Energy Info (EERE)

Flash Jump to: navigation, search Retrieved from "http:en.openei.orgwindex.php?titleDoubleFlash&oldid599606"...

382

Policies  

NLE Websites -- All DOE Office Websites (Extended Search)

Policies Policies The Research Library provides a large collection of print and electronic books, journals, reports, conference proceedings and many audiovisual materials....

383

EM News Flashes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

flashes Office of Environmental Management 1000 Independence Ave., SW Washington, DC 20585 202-586-7709 en Head of EM Visits Waste Isolation Pilot Plant for First Underground Tour...

384

Policies  

E-Print Network (OSTI)

Optimization Online Policy. Mission statement. Optimization Online is a repository of eprints about optimization and related topics. It facilitates quick ...

385

Flash2006-23Attachment.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CORRECTION NOTICE FLASH 2005-23 CORRECTION NOTICE FLASH 2005-23 SUMMARY OF CHANGES IN MAKE-OR-BUY ELIMINATION A study of the Make-or-Buy process concluded that it was costly to administer and did not produce the expected benefits. 1. Section 901.105 is amended to remove the reference to the Make-or-Buy paperwork clearance under the Paperwork Reduction Act. 2. Section 970.1504-4-1, Make-or-Buy Plans, is removed. It included 970.1504-4-2, Policy, and 970.1504-3, Requirements. 3. Section 970.1504-5(b) is removed. It was the instruc tion for use of the Make-or-Buy Plan clause. 4. Section 970.5203-1, Management Controls, is amended to include outsourcing of functions as a consideration of efficient and effective operations. 5. Section 970.5203-2, Performance improvement and collaboratio

386

Recovery News Flashes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

news-flashes Office of Environmental news-flashes Office of Environmental Management 1000 Independence Ave., SW Washington, DC 20585 202-586-7709 en "TRU" Success: SRS Recovery Act Prepares to Complete Shipment of More Than 5,000 Cubic Meters of Nuclear Waste to WIPP http://energy.gov/em/downloads/tru-success-srs-recovery-act-prepares-complete-shipment-more-5000-cubic-meters-nuclear "TRU" Success: SRS Recovery Act Prepares to Complete Shipment of More Than 5,000 Cubic Meters of Nuclear Waste to WIPP

387

Policy Flash 2011-2 Attachment 1  

Energy.gov (U.S. Department of Energy (DOE))

During election seasons, questions arise regarding political activities on DOE facilities or using DOE email addresses. The General Counsel has issued guidance on this issue for federal employees.

388

 

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 DATE: October 27, 2010 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Revised DOE Acquisition Guide Chapter 42.1 Indirect Rate Administration (October 2010) SUMMARY: The Office of Procurement and Assistant Management (OPAM) has issued the above Acquisition Guide Chapter. DOE Acquisition Guide Chapter 42.1 Indirect Rate Administration has been revised to provide the current references and requirements. This Flash will be available online at the following website: http://www.management.energy.gov/policy_guidance/policy_flashes.htm. Questions concerning this policy flash should be directed to Helen Oxberger at

389

Vacuum flash evaporated polymer composites  

DOE Patents (OSTI)

A method for fabrication of polymer composite layers in a vacuum is disclosed. More specifically, the method of dissolving salts in a monomer solution, vacuum flash evaporating the solution, condensing the flash evaporated solution as a liquid film, and forming the condensed liquid film into a polymer composite layer on a substrate is disclosed.

Affinito, J.D.; Gross, M.E.

1997-10-28T23:59:59.000Z

390

POLICY  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2013 3, 2013 POLICY * Successful execution of this research and development (R&D) program will materially contribute to U.S. supply of oil and gas both today and beyond the 10 year R&D horizon. It is the consensus of this Committee that the resource potential impacted by this technology program is significant and of major importance to the Nation. There is a critical need for a sustainable and consistent approach to the technology challenges facing unconventional resource development. * The Committee believes the Plan and the procedures followed in its development to be professional and inclusive, with a significant infusion of industry knowledge. * These Independents are faced with unique and ever more difficult technical challenges in developing new unconventional resources, yet they often lack the

391

TO: Procurement Directors FROM: Director, Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2011-56 POLICY FLASH 2011-56 DATE: March 16, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Publication of Federal Acquisition Circular 2005-50 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular 2005-50 which makes miscellaneous changes to the Federal Acquisition Regulation. We are reviewing Item II for possible changes we may need to make in DOE Acquisition Guide Chapter 38. This Flash and its attachment will be available online within a day, at the following website: http://www.management.energy.gov/policy_guidance/policy_flashes.htm. Federal Acquisition Circulars may be found, in both their Federal Register notice form

392

Flash pyrolysis of sewage sludge  

Science Journals Connector (OSTI)

Flash pyrolysis of sewage sludge ... Influence of the Pyrolysis Temperature on Sewage Sludge Product Distribution, Bio-Oil, and Char Properties ... Influence of the Pyrolysis Temperature on Sewage Sludge Product Distribution, Bio-Oil, and Char Properties ...

Jan Piskorz; Donald S. Scott; Ian B. Westerberg

1986-01-01T23:59:59.000Z

393

Flash Steam Power Plant | Open Energy Information  

Open Energy Info (EERE)

Flash Steam Power Plant Flash Steam Power Plant (Redirected from Flash Steam Power Plants) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Flash Steam Power Plants General List of Flash Steam Plants Flash Steam power plant process diagram - DOE EERE 2012 Flash steam plants are the most common type of geothermal power generation plants in operation in the world today. Fluid at temperatures greater than 360°F (182°C) is pumped under high pressure into a tank at the surface held at a much lower pressure, causing some of the fluid to rapidly vaporize, or "flash." The vapor then drives a turbine, which drives a generator. If any liquid remains in the tank, it can be flashed again in a second tank to extract even more energy.[1] Facility Name Owner Capacity (MW) Facility

394

Flash Estimate July 2005 Final.xls  

Gasoline and Diesel Fuel Update (EIA)

and Stock Trends and Stock Trends Page 5 6. Month-to-Month Comparisons: Electric Power Retail Sales and Average Prices Page 6 7. Retail Sales Trends Page 7 8. Average Retail Price Trends Page 8 9. Heating and Cooling Degree Days Page 9 10. Documentation Page 10 Monthly Flash Estimates of Data for: May 2005 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be attributed to the Energy Information Administration and should not be construed as advocating or reflecting any policy of the Department of Energy or any other organization. For additional information, contact Orhan Yildiz at 202-287-1586, or at Orhan.Yildiz@eia.doe.gov.

395

Flash Estimate August 2005 Final.xls  

Gasoline and Diesel Fuel Update (EIA)

and Stock Trends and Stock Trends Page 5 6. Month-to-Month Comparisons: Electric Power Retail Sales and Average Prices Page 6 7. Retail Sales Trends Page 7 8. Average Retail Price Trends Page 8 9. Heating and Cooling Degree Days Page 9 10. Documentation Page 10 Monthly Flash Estimates of Data for: June 2005 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the U.S. Department of Energy. The information contained herein should be attributed to the Energy Information Administration and should not be construed as advocating or reflecting any policy of the Department of Energy or any other organization. For additional information, contact Orhan Yildiz at 202-287-1586, or at Orhan.Yildiz@eia.doe.gov.

396

flash2004-18attachment1.pdf | Department of Energy  

Energy Savers (EERE)

attachment1.pdf flash2004-18attachment1.pdf flash2004-18attachment1.pdf More Documents & Publications flash2004-18attachment2.pdf flash2004-18.pdf Financial Management Handbook...

397

Analysis of accidents during flashing operations  

E-Print Network (OSTI)

occurred at intersections under flashing operation compared to those operating in the normal mode. A statistical analysis was conducted to determine the safety of flashing signal operation. No significant increases in accidents or accident severity were...

Obermeyer, Michael Edward

2012-06-07T23:59:59.000Z

398

Flash Steam Power Plant | Open Energy Information  

Open Energy Info (EERE)

Flash Steam Power Plant Flash Steam Power Plant Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Flash Steam Power Plants General List of Flash Steam Plants Flash Steam power plant process diagram - DOE EERE 2012 Flash steam plants are the most common type of geothermal power generation plants in operation in the world today. Fluid at temperatures greater than 360°F (182°C) is pumped under high pressure into a tank at the surface held at a much lower pressure, causing some of the fluid to rapidly vaporize, or "flash." The vapor then drives a turbine, which drives a generator. If any liquid remains in the tank, it can be flashed again in a second tank to extract even more energy.[1] Facility Name Owner Capacity (MW) Facility Type Commercial Online Date Geothermal Area

399

Cooling Fusion in a Flash | Princeton Plasma Physics Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

Cooling Fusion in a Flash American Fusion News Category: U.S. Universities Link: Cooling Fusion in a Flash...

400

Initial breakdown pulses in intracloud lightning flashes and their relation to terrestrial gamma ray flashes  

E-Print Network (OSTI)

Initial breakdown pulses in intracloud lightning flashes and their relation to terrestrial gamma breakdown stage of 10 intracloud lightning flashes that may have produced terrestrial gamma ray flashes, and S. Xiong (2013), Initial breakdown pulses in intracloud lightning flashes and their relation

Cummer, Steven A.

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

The real science behind FlashForward  

ScienceCinema (OSTI)

Berkeley Lab nuclear physicist Peter Jacobs discusses the ALICE experiment, setting of the science fiction novel FlashForward.

Peter Jacobs

2010-01-08T23:59:59.000Z

402

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 - 25770 of 26,764 results. 61 - 25770 of 26,764 results. Download DOE F 470.2 FACILITY DATA AND APPROVAL RECORD (FDAR) http://energy.gov/cio/downloads/doe-f-4702 Download DOE F 471.1 Security Incident Notification Report http://energy.gov/cio/downloads/doe-f-4711 Download DOE - BCS TSD comments http://energy.gov/gc/downloads/doe-bcs-tsd-comments Download Public Comment re Price-Anderson Act http://energy.gov/gc/downloads/public-comment-re-price-anderson-act-5 Download Davis-Bacon Compliance and Performance http://energy.gov/gc/downloads/davis-bacon-compliance-and-performance Download Policy_Statement_on_TT.pdf http://energy.gov/gc/downloads/policystatementonttpdf Download Flash2001-16.pdf http://energy.gov/management/downloads/flash2001-16pdf Download OPAM Policy Acquisition Guides http://energy.gov/management/downloads/opam-policy-acquisition-guides-1

403

Multi-stage flash degaser  

DOE Patents (OSTI)

A multi-stage flash degaser is incorporated in an energy conversion system having a direct-contact, binary-fluid heat exchanger to remove essentially all of the noncondensable gases from geothermal brine ahead of the direct-contact binary-fluid heat exchanger in order that the heat exchanger and a turbine and condenser of the system can operate at optimal efficiency.

Rapier, P.M.

1980-06-26T23:59:59.000Z

404

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: October 12, 2012 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Extension of SBA-DOE 8(a) Partnership Agreement SUMMARY: The current Partnership Agreement between the Small Business Administration and the Department of Energy has been extended through October 31, 2012. This Flash will be available online at the following website: http://energy.gov/management/office-management/operational- management/procurement-and-acquisition/policy-flashes. Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy,

405

Multi-stage flash degaser  

DOE Patents (OSTI)

A multi-stage flash degaser (18) is incorporated in an energy conversion system (10) having a direct-contact, binary-fluid heat exchanger to remove essentially all of the noncondensable gases from geothermal brine ahead of the direct-contact binary-fluid heat exchanger (22) in order that the heat exchanger (22) and a turbine (48) and condenser (32) of the system (10) can operate at optimal efficiency.

Rapier, Pascal M. (Richmond, CA)

1982-01-01T23:59:59.000Z

406

News Flash - HPMC Occupational Health Services  

NLE Websites -- All DOE Office Websites (Extended Search)

of Privacy Practices Patient Rights & Responsibilities Frequently Asked Questions News Flash Email Email Page | Print Print Page |Text Increase Font Size Decrease Font Size...

407

Digital Photography with Flash and No-Flash Image Pairs Georg Petschnigg Maneesh Agrawala Hugues Hoppe  

E-Print Network (OSTI)

(bottom) Flash No-Flash Detail Transfer with Denoising Figure 1: This candlelit setting from the wine cave include denoising and detail transfer (to merge the ambient qualities of the no-flash image with the high demonstrate how these applications can synthesize new images that are of higher quality than either

Cohen, Michael

408

Microfabrication Policies  

NLE Websites -- All DOE Office Websites (Extended Search)

Polcies Booking Login Policy Cleanroom Policy Equipment Use Policy 2 Person Rule Experimental Hall Policy After Hours Policy...

409

flash2004-18attachment2.pdf | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

flash2004-18attachment2.pdf flash2004-18attachment2.pdf More Documents & Publications flash2004-18attachment1.pdf Financial Management Handbook AcqGuide70pt4.doc&0;...

410

POLICY SECTIONS POLICY OFFICE  

E-Print Network (OSTI)

POLICY SECTIONS POLICY OFFICE POLICIES FORMS PROCEDURES UNIVERSITY POLICY #12;guide to WRITING POLICIES Administrative policies align opera- tions, set behavior expectations across the University system and communicate policy roles and responsibilities. You, as the policy owner or writer, have the important task

Minnesota, University of

411

N. Baboi, MDIN. Baboi, MDI FLASH Seminar, Dec. 8, 2009FLASH Seminar, Dec. 8, 2009 Status of FLASH-BPMsStatus of FLASH-BPMs  

E-Print Network (OSTI)

-BPMsStatus of FLASH-BPMs ·Status of BPM-system ·Maintenance work checked/adjusted trigger delay, zero-offset, calibration 6BYP: used by energy server ·BPM studies HERA (Neumann) electronics in TCA tested toroid in TCA tested BPM resolution for multibunch toroid resolution vs. charge ·FLASH Upgrade Changes in the BPM

412

Flash Center for Computational Science The University of Chicago  

NLE Websites -- All DOE Office Websites (Extended Search)

Flash Center for Computational Science Flash Center for Computational Science The University of Chicago Flash Center for Computational Science Mira Early Science Project Conference Argonne National Laboratory 15 May 2013 Carlo Graziani Flash Center University of Chicago New Insights Into Buoyancy-Driven Turbulent Nuclear Combustion from Large-Scale 3D FLASH Simulations Flash Center for Computational Science The University of Chicago What are Type Ia supernovae? Supernova Cosmology Project Flash Center for Computational Science The University of Chicago What are Type Ia supernovae? Supernova Cosmology Project Peak luminosities of most Type Ia SNe are similar - making them excellent "cosmic yardsticks" Flash Center for Computational Science The University of Chicago

413

T-569: Adobe Flash SWF File Processing Memory Corruption Remote...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

69: Adobe Flash SWF File Processing Memory Corruption Remote Code Execution Vulnerability T-569: Adobe Flash SWF File Processing Memory Corruption Remote Code Execution...

414

T-539: Adobe Acrobat, Reader, and Flash Player Arbitrary Code...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

T-539: Adobe Acrobat, Reader, and Flash Player Arbitrary Code Execution Vulnerability T-539: Adobe Acrobat, Reader, and Flash Player Arbitrary Code Execution Vulnerability January...

415

V-176: Adobe Flash Player Memory Corruption Flaw Lets Remote...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Adobe Flash Player Memory Corruption Flaw Lets Remote Users Execute Arbitrary Code V-176: Adobe Flash Player Memory Corruption Flaw Lets Remote Users Execute Arbitrary Code June...

416

V-018: Adobe Flash Player Buffer Overflows and Memory Corruption...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Adobe Flash Player Buffer Overflows and Memory Corruption Errors Let Remote Users Execute Arbitrary Code V-018: Adobe Flash Player Buffer Overflows and Memory Corruption Errors...

417

TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

POLICY FLASH 2013-58 POLICY FLASH 2013-58 DATE: June 5, 2013 TO: Procurement Directors FROM: Director, Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Revised Guide for Financial Assistance SUMMARY: Attached is a revised Guide for Financial Assistance. The Guide has been updated to reflect changes to web sites, organization names, systems, and DOE policies and practices since the guide was last issued. The revision date has been inserted in the section heading for all sections that had substantive changes (not just web site or organization name changes). This flash and its attachments may be viewed at http://management.energy.gov/policy_guidance/policy_flashes.htm.

418

BOILER BLOW-DOWN FLASH RECOVERY  

E-Print Network (OSTI)

Malelane’s boiler blow-down flash, which was previously rejected to atmosphere, is now recovered into the turbo-alternator exhaust steam range and used for process heating duty. Various flash vapour recovery options have been evaluated for operability, maintainability and cost effectiveness. The design considerations for the blow-down vessel and the valve and piping configuration, which resulted from a Hazop Study, are explained. The recovery of 1.6 tons per hour of boiler blowdown flash equates to R260 000 per annum in coal savings.

I Singh; F Weyers

419

V-087: Adobe Flash Player Two Vulnerabilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Adobe Flash Player Two Vulnerabilities 7: Adobe Flash Player Two Vulnerabilities V-087: Adobe Flash Player Two Vulnerabilities February 8, 2013 - 6:00am Addthis PROBLEM: Two vulnerabilities have been reported in Adobe Flash Player PLATFORM: Vulnerabilities are reported in the following versions: Adobe Flash Player versions 11.5.502.146 and earlier for Windows and Macintosh Adobe Flash Player versions 11.2.202.261 and earlier for Linux Adobe Flash Player versions 11.1.115.36 and earlier for Android 4.x Adobe Flash Player versions 11.1.111.31 and earlier for Android 3.x Adobe Flash Player versions 11.5.31.137 and earlier for Chrome users Adobe Flash Player versions 11.3.378.5 and earlier for Internet Explorer 10 users on Windows 8 ABSTRACT: Two vulnerabilities are reported as 0-day which can be exploited by

420

U-035: Adobe Flash Player Multiple Vulnerabilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

35: Adobe Flash Player Multiple Vulnerabilities 35: Adobe Flash Player Multiple Vulnerabilities U-035: Adobe Flash Player Multiple Vulnerabilities November 14, 2011 - 10:15am Addthis PROBLEM: Adobe Flash Player Multiple Vulnerabilities. PLATFORM: Adobe Flash Player 11.0.1.152 and earlier versions for Windows, Macintosh, Linux and Solaris operating systems Adobe Flash Player 11.0.1.153 and earlier versions for Android Adobe AIR 3.0 and earlier versions for Windows, Macintosh, and Android ABSTRACT: Adobe recommends users of Adobe Flash Player 11.0.1.152 and earlier versions for Windows, Macintosh, Linux and Solaris update to Adobe Flash Player 11.1.102.55. Users of Adobe Flash Player 11.0.1.153 and earlier versions for Android should update to Adobe Flash Player 11.1.102.59 for Android. Users of Adobe AIR 3.0 for Windows, Macintosh, and Android should

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

V-087: Adobe Flash Player Two Vulnerabilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Adobe Flash Player Two Vulnerabilities 7: Adobe Flash Player Two Vulnerabilities V-087: Adobe Flash Player Two Vulnerabilities February 8, 2013 - 6:00am Addthis PROBLEM: Two vulnerabilities have been reported in Adobe Flash Player PLATFORM: Vulnerabilities are reported in the following versions: Adobe Flash Player versions 11.5.502.146 and earlier for Windows and Macintosh Adobe Flash Player versions 11.2.202.261 and earlier for Linux Adobe Flash Player versions 11.1.115.36 and earlier for Android 4.x Adobe Flash Player versions 11.1.111.31 and earlier for Android 3.x Adobe Flash Player versions 11.5.31.137 and earlier for Chrome users Adobe Flash Player versions 11.3.378.5 and earlier for Internet Explorer 10 users on Windows 8 ABSTRACT: Two vulnerabilities are reported as 0-day which can be exploited by

422

U-187: Adobe Flash Player Multiple Vulnerabilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Adobe Flash Player Multiple Vulnerabilities 7: Adobe Flash Player Multiple Vulnerabilities U-187: Adobe Flash Player Multiple Vulnerabilities June 11, 2012 - 7:00am Addthis PROBLEM: Multiple vulnerabilities have been reported in Adobe Flash Player PLATFORM: Adobe Flash Player 11.2.202.235 and earlier for Windows, Macintosh and Linux Adobe Flash Player 11.1.115.8 and earlier for Android 4.x Adobe Flash Player 11.1.111.9 and earlier for Android 3.x and 2.x Adobe AIR 3.2.0.2070 and earlier for Windows, Macintosh and Android ABSTRACT: Adobe released security updates for Adobe Flash Player 11.2.202.235 and earlier versions for Windows, Macintosh and Linux, Adobe Flash Player 11.1.115.8 and earlier versions for Android 4.x, and Adobe Flash Player 11.1.111.9 and earlier versions for Android 3.x and 2.x. These updates

423

Proton Efflux and Phosphorylation in Flash Groups  

Science Journals Connector (OSTI)

When thylakoid membranes are illuminated by single turnover flashes, transmembrane redox reactions in photosystem I and II lead to the rapid generation (>1 ns) of a transmembrane electric potential difference,...

P. Bogdanoff; P. Gräber

1990-01-01T23:59:59.000Z

424

New Diagnostics in the FLASH Dump Line  

E-Print Network (OSTI)

Line Status Aug. 2009 BPM 9DUMP BPM 15DUMP BPM 5DUMP Toroid 9DUMP OTR screen 9DUMP BLM 14DUMP BLM 13 at the dump #12;N. Baboi, MDIN. Baboi, MDI FLASH Seminar, Dec. 1, 2009FLASH Seminar, Dec. 1, 2009 Old BPM 15DUMPOld BPM 15DUMP ·Strange behavior of BPM signals measured impedance from end of cable (in bld. 49): L

425

Microsoft Word - Policy Flash 2011-2 Attachment 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

activities on DOE facilities or using DOE email addresses. The General Counsel has issued guidance on this issue for federal employees [see attached]. The following Q&A relates to contractors' use of Government property for political activity. Please ensure that your contractors are aware of and respect these limitations. Contractor Political Activity Q: Are DOE contractors permitted to use Government property or facilities to conduct political activity? A: No, political activity is not an authorized use of Government property or facilities and the Contracting Officer will not approve or allow its use. Q: Does DOE Order 203.1, which is entitled, "Limited Personal use of Government

426

Microsoft Word - Policy Flash 2008-05.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUGUST 2008 AUGUST 2008 MEMORANDUM FOR ALL PROGRAM ELEMENTS FROM: PAUL BOSCO DIRECTOR, OFFICE OF ENGINEERING AND CONSTRUCTION MANAGEMENT CO-CHAIR, CERTIFICATION REVIEW BOARD ALICE C. WILLIAMS ASSOCIATE ADMINISTRATOR INFRASTRUCTURE AND ENVIRONMENT CO-CHAIR, CERTIFICATION REVIEW BOARD SUBJECT: Project Management Career Development Continuing Education Credit The Certification Review Board (CRB) changes to the continuing education (CE) hours awarded to PMCDP courses are as follows, effective immediately: PMCDP CE hour credits will match those awarded by Project Management Institute (PMI). The CRB expands the activities for which continuing education credit may be requested by adding the following 3 additional activities: Participation on O413.3A Guide Team:

427

Microsoft Word - Policy Flash 2010-81 Attachment 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 70-31C (September 2010) Chapter 70-31C (September 2010) 1 Contractor Legal Management Requirements Overview This guide chapter deals with two aspects of the Department's system of managing legal costs- ensuring our major contractors prudently hire and continue to retain as outside counsel only those law firms who have demonstrated reliable billing practices; and ensuring appropriate consideration of the contractor's exercise of prudent business judgment when determining the allowability of settlement costs. Background DOE has placed special emphasis on managing contractor litigation for over a decade. The first litigation management procedures, issued in March 1994, applied to virtually all cases where DOE might be contractually responsible for contractor litigation costs. They imposed

428

Microsoft Word - Policy Flash 2010-73 Attachment 4  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PAST-PERFORMANCE REFERENCE INFORMATION FORM (JUL 2010) PAST-PERFORMANCE REFERENCE INFORMATION FORM (JUL 2010) 1. Complete name of Government agency, commercial firm, or other organization 2. Complete address 3. Contract number or other reference and type 4. Date of contract 5. Date work commenced 6. Date work was completed or scheduled to be completed 7. Contract Type and Contract Value 8. Final amount invoiced or amount invoiced to date 9a. Technical point of contact (name, title, company/agency, address, telephone number, fax number, and e-mail address) 9b. Contracting point of contact (name, title, company/agency, address, telephone number, fax number, and e-mail address) 9c. Environmental Regulator point of contact (name, title, company/agency, address, telephone number, fax number, and e-mail

429

Policy Flash 2011-96 Attachment.pdf  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

in solicitations involving M&O contracts, management of major in solicitations involving M&O contracts, management of major facilities, and any acquisition which could involve the direct or indirect purchase of Information Technology equipment that uses Internet Protocol (IP) technology. DOE-H-__ COMPLIANCE WITH INTERNET PROTOCOL VERSION 6 (IPV6) IN ACQUIRING INFORMATION TECHNOLOGY (JULY 2011) This contract involves the acquisition of Information Technology (IT) that uses Internet Protocol (IP) technology. The Contractor agrees that (1) all deliverables that involve IT that uses IP (products, services, software, etc.) comply with IPv6 standards and interoperate with both IPv6 and IPv4 systems and products; and (2) it has IPv6 technical support for fielded product management, development and implementation available. If the Contractor plans to offer a deliverable that involves

430

Microsoft Word - Policy Flash 2010-77 Attachment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Use of Federal Supply Schedules Use of Federal Supply Schedules Contractors placing orders under Federal Supply Schedule contracts shall follow the terms of the applicable Schedule contract and include with each order- * A copy of the letter of authorization (unless a copy of the authorization was previously furnished to the Federal Supply Schedule contractor); and * The following statement: This order is placed under written authorization from _____________________________ dated ______________. In the event of any inconsistency between the terms and conditions of this order and those of your Federal Supply Schedule contract, the latter will govern. _______________________________________________________________________________________ _______________________________________________________________________________________

431

Microsoft Word - Policy Flash 2010-67 Attachment 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy No. AL-2009-03 Revision 1 Department of Energy No. AL-2009-03 Revision 1 Acquisition Regulation Date XXXXXXX ACQUISITION LETTER This Acquisition Letter is issued under the authority of the DOE and NNSA Procurement Executives. Subject: Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning References: FAR Subpart 6.1 Full and Open Competition FAR Subpart 6.3 Other than Full and Open Competition FAR Part 7 Acquisition Planning FAR Part 34 Major System Acquisition DEAR Subpart 917.6 Management and Operating Contracts DEAR 970.1706-1 Award, Renewal, and Extension Acquisition Guide Chapter 7.1, Acquisition Planning

432

Microsoft Word - Policy Flash 2010-73 Attachment 5  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Attachment L-___ Past Performance Information Questionnaire (JUL 2010) Attachment L-___ Past Performance Information Questionnaire (JUL 2010) 4 = Outstanding Performance was substantially and consistently above contract requirements. Contractor displayed an overall superior understanding of contract requirements, and used innovative approaches leading to enhanced performance. 3 = Good Performance was above minimum contract requirements. Contractor displayed a thorough understanding of contract requirements. 2 = Satisfactory Performance met minimum contract requirements. 1 = Marginal Performance was below minimum contract requirements. Contractor displayed a lack of thorough understanding of contract requirements in one or more significant performance areas. 0 = Unsatisfactory Performance completely failed to meet the minimum contract requirements.

433

Microsoft Word - Policy Flash 2008-11.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OCTOBER 17, 2008 OCTOBER 17, 2008 MEMORANDUM FOR ALL PROGRAM ELEMENTS FROM: PAUL BOSCO DIRECTOR, OFFICE OF ENGINEERING AND CONSTRUCTION MANAGEMENT CO-CHAIR, CERTIFICATION REVIEW BOARD ALICE C. WILLIAMS ASSOCIATE ADMINISTRATOR INFRASTRUCTURE AND ENVIRONMENT CO-CHAIR, CERTIFICATION REVIEW BOARD SUBJECT: Project Management Career Development Interim Certification The Certification Review Board announces the following addition to the PMCDP. Beginning in November 2008, an interim federal project director (FPD) certification is established. Participants. Private or public sector professionals hired in to project management billets that will assume federal project manager duties upon entry under DOE Order 413.3A Program and Project Management for the Acquisition of Capital Assets. (i.e., formal designation as the project

434

Microsoft Word - Policy Flash 2008-06.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work/Development Work/Development Requirement The Certification Review Board announces the following modifications to the work/development competencies. All persons coming forward for initial PMCDP certification or certification at a higher level will be required to comply with these modifications. These modifications will be included in the current updating of the Certification and Equivalency Guide. * Beginning July 1, 2008, former experience must be documented with a copy of project documents naming the FPD. This can be through a variety of project documents such as, but not limited to: o Page from Project Execution Plan that names the FPD o Page from Program/Project Plan which names the FPD o ESSAB documents naming the FPD o Organization chart * Beginning January 1, 2009, FPDs will be required to submit the relevant Federal personnel

435

Microsoft Word - Policy Flash 2008-09.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PAUL BOSCO PAUL BOSCO DIRECTOR, OFFICE OF ENGINEERING AND CONSTRUCTION MANAGEMENT CO-CHAIR, CERTIFICATION REVIEW BOARD ALICE C. WILLIAMS ASSOCIATE ADMINISTRATOR INFRASTRUCTURE AND ENVIRONMENT CO-CHAIR, CERTIFICATION REVIEW BOARD SUBJECT: Project Management Career Development Work/Developmental Requirement The Certification Review Board announces the following clarification to roles required of a Deputy Federal Project Director (FPD). In order to obtain credit as a Deputy FPD, the following criteria must be met: * Formally recognized in project documents (e.g. Project Execution Plan) on a Level 3 or higher project. * Serve one continuous year as the deputy FPD as reflected in an SF-50 to receive formal recognition. This is not required for those with experience from past years when SF-50

436

Microsoft Word - Policy Flash 2010-67 Attachment 2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

----------------------------Chapter 7.1 (JUNE 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination

437

Microsoft Word - Policy Flash 2008-01.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2008 5, 2008 MEMORANDUM FOR ALL PROGRAM ELEMENTS FROM: PAUL BOSCO DIRECTOR, OFFICE OF ENGINEERING AND CONSTRUCTION MANAGEMENT CO-CHAIR, CERTIFICATION REVIEW BOARD ALICE C. WILLIAMS ASSOCIATE ADMINISTRATOR INFRASTRUCTURE AND ENVIRONMENT CO-CHAIR, CERTIFICATION REVIEW BOARD SUBJECT: Project Management Career Development Requirement On February 15, 2008, the Project Management Career Development Program (PMCDP) Certification Review Board (CRB) recommended that all certification candidate profiles include specific experiential details when addressing a competency. This information should be included whether the certification candidate has completed the PMCDP training or not. Emphasis should be placed on how the knowledge gained from the training impacted the project or their ability as

438

Microsoft Word - Policy Flash 2010-70 Attachment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0-70 for FAC 2005-43 1 0-70 for FAC 2005-43 1 FAC 2005-43 is summarized below and states whether any DOE supplemental guidance will be issued. Item I - Government Property (FAR Case 2008-011) (Final) 48 CFR Parts 2, 4, 15, 32, 42,45 and 52 Effective date: August 2, 2010 This final rule amends the FAR to revise FAR part 45 and its associated clauses. Changes are being made to FAR parts 2, 4, 15, 32, 42, 45, and 52. These changes are to clarify and correct the previous FAR rule for part 45, Government Property, published under Federal Acquisition Circular 2005-17, FAR case 2004-025, May 15, 2007, (72 FR 27364). Minor changes are made to the proposed rule published August 6, 2009 (74 FR 39262). The rule specifically impacts contracting officers, property administrators, and

439

Microsoft Word - Policy Flash 2008-10.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ALICE C. WILLIAMS ALICE C. WILLIAMS ASSOCIATE ADMINISTRATOR INFRASTRUCTURE AND ENVIRONMENT CO-CHAIR, CERTIFICATION REVIEW BOARD PAUL BOSCO DIRECTOR, OFFICE OF ENGINEERING AND CONSTRUCTION MANAGEMENT CO-CHAIR, CERTIFICATION REVIEW BOARD SUBJECT: Project Management Career Development Decertification The Certification Review Board announces the following clarification of decertification of Federal Project Directors (FPD). Applicable program offices will be notified by the Secretariat of the CRB if certified federal project directors fail to maintain CE hours and given a 90-day notification of pending revocation of certification. The CRB may consider extenuating circumstances such as illness or military service which prevent them from remedying identified deficiencies.

440

Microsoft Word - Policy Flash 2010-73 Attachment 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

_ Letter of Commitment (JUL 2010) _ Letter of Commitment (JUL 2010) I, _______________________(proposed person's name) a proposed Key Person for _____________________________ (name of offeror) hereby certify that the all of the information contained in my resume which was submitted as part of the proposal in response to Request for Proposals (RFP)___________________ is true and correct. Furthermore, if___________________ (name of offeror) is awarded the contract associated with the aforementioned RFP, I hereby agree to accept employment for the proposed position of________________ (insert title of proposed position) and commit to perform in this position for _________________ (Contracting Officer insert time period). _________________________ SIGNATURE OF KEY PERSON

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Microsoft Word - Policy Flash 2008-02.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2008 8, 2008 MEMORANDUM FOR ALL PROGRAM ELEMENTS FROM: ALICE C. WILLIAMS ASSOCIATE ADMINISTRATOR INFRASTRUCTURE AND ENVIRONMENT CO-CHAIR, CERTIFICATION REVIEW BOARD PAUL BOSCO DIRECTOR, OFFICE OF ENGINEERING AND CONSTRUCTION MANAGEMENT CO-CHAIR, CERTIFICATION REVIEW BOARD SUBJECT: Project Management Career Development Course Requirement On October 5, 2006, the Project Management Career Development Program (PMCDP) Certification Review Board (CRB) communicated a change in the PMCDP curriculum to add the PMCDP course Integrating Safety into Project Management to the PMCDP level 1 required core curriculum. Federal project directors (FPDs) were notified that they were to complete this training at the earliest possible opportunity, or demonstrate they have completed equivalent

442

Policy Flash 2012-9 | Department of Energy  

Office of Environmental Management (EM)

Guide chapters to include these. Attachment 1 - Federal Acquisition Regulation Clause Usage Guide Attachment 2 - Acquisition Regulation Solicitation Provision and Contract Clause...

443

Policy Flash 2013-61 The Whistleblower Protection Enhancement...  

Energy Savers (EERE)

Protection Enhancement Act of 2012 or the April 24, 2013 DOECAST, contact Beth Kelly, Deputy Assistant General Counsel for Procurement and Financial Assistance at (202)...

444

Policy Flash 2011-102 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

70.7 Subcontract Management-For Commercial Items & Services under 100,000. The Contracting Officer must ensure that the contractor is sufficiently managing its purchasing...

445

Policy Flash 2011-97 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

(CRD) to DOE N 435.1 Contact-Handled and Remote-Handled Transuranic Waste Packaging. Contracting Officers are responsible for incorporating the CRD into affected contracts. Since...

446

Policy Flash 2012-10 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The attached Acquisition Letter has been issued to provide application guidance to contracting officers for determining the allowability of incurred costs due to contractor...

447

Policy Flash 2012-25 | Department of Energy  

Energy Savers (EERE)

- Acquisition Career Management Program Handbook, Partial Revision of Chapter 11, Contracting Officer's Representative and related documents. NOTE: As of 282013, the file...

448

Policy Flash 2011-99 | Department of Energy  

Energy Savers (EERE)

Financial Assistance Program certification identified revisions required for the Contracting Officer Warrant Requirements that apply to Technology Investment Agreements (TIAs)....

449

Policy Flash 2012-56 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Incorporation of the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Non-Management and Operating Contracts Questions...

450

Policy Flash 2012-3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

will continue as established in Acquisition LetterFinancial Acquisition Letter (ALFAL) AL 2011- 05FAL 2011-01 Congressional Notification of Pending Contract or Financial...

451

Policy Flash 2014-05 Continuing Appropriations Act, 2014 -- Implementa...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

be directed to Barbara Binney at (202) 287-1340 or barbara.binney@hq.doe.gov for the AL or Richard Bonnell at (202) 287-1747 or at richard.bonnell@hq.doe.gov for the FAL....

452

Policy Flash 2011-103 | Department of Energy  

Energy Savers (EERE)

and Operating (M&O) Contracts This is to provide notice that an Acquisition Letter (AL) will be issued addressing the establishment of subcontract review thresholds on M&O...

453

Microsoft Word - Policy Flash 2010-78 Attachment 4 Successful...  

Office of Environmental Management (EM)

Mr. John Doe President ABC Company 2222 Anywhere Street Sun City, TT 22222 Dear Mr. Doe: NOTICE OF SELECTION OF insert name of successful offeror FOR THE (insert title of...

454

Policy Flash 2011-104 | Department of Energy  

Office of Environmental Management (EM)

utilization of: (1) the General Service Administration's Blanket Purchase Agreements (BPA) under the Federal Strategic Sourcing Initiative for Office Supplies Second Generation...

455

Microsoft Word - Policy Flash 2011-63 Attachment 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Yearly; 180 days after the end of the recipient's fiscal year Yearly; 180 days after the end of the recipient's fiscal year O - Other; See instructions for further details. 5. Special Instructions: Annual Indirect Cost Proposal - If DOE is the Cognizant Federal Agency, then the proposal should be sent https://www.fedconnect.net/fedconnect/default.aspx . Otherwise, it should be sent to the Cognizant Federal Agency. Audit of For-Profit Recipients must be sent to 2 different addresses in accordance with the final audit guidance . A copy for the Contracting Officer shall be submitted via https://www.fedconnect.net/fedconnect/default.aspx ; a copy must also be e-mailed to the CFO at DOE-Audit- Submission@hq.doe.gov DOE F 4600.2 (03/11) All Other Editions Are Obsolete U.S. Department of Energy

456

Network Policies  

NLE Websites -- All DOE Office Websites (Extended Search)

Acceptable Use Policy About ESnet Our Mission The Network ESnet History Governance & Policies ESnet Policy Board ESCC Acceptable Use Policy Facility Data Policy Career...

457

V-090: Adobe Flash Player / AIR Multiple Vulnerabilities | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Adobe Flash Player / AIR Multiple Vulnerabilities 0: Adobe Flash Player / AIR Multiple Vulnerabilities V-090: Adobe Flash Player / AIR Multiple Vulnerabilities February 13, 2013 - 12:14am Addthis PROBLEM: Adobe Flash Player / AIR Multiple Vulnerabilities PLATFORM: Adobe Flash Player versions 11.5.502.149 and prior for Windows and Macintosh Adobe Flash Player versions 11.2.202.262 and prior for Linux Adobe Flash Player versions 11.1.115.37 and prior for Android 4.x Adobe Flash Player versions 11.1.111.32 and prior for Android 3.x and 2.x Adobe AIR versions 3.5.0.1060 and prior Adobe AIR versions 3.5.0.1060 SDK and prior ABSTRACT: Multiple vulnerabilities have been reported in Adobe Flash Player and AIR. REFERENCE LINKS: Vulnerability identifier: APSB13-05 Secunia Advisory SA52166 CVE-2013-0637 CVE-2013-0638 CVE-2013-0639

458

U-104: Adobe Flash Player Multiple Vulnerabilities | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Adobe Flash Player Multiple Vulnerabilities 4: Adobe Flash Player Multiple Vulnerabilities U-104: Adobe Flash Player Multiple Vulnerabilities February 16, 2012 - 6:30am Addthis PROBLEM: Adobe Flash Player Multiple Vulnerabilities PLATFORM: Adobe Flash Player versions 11.1.102.55 and prior for Windows, Macintosh, Linux, and Solaris Adobe Flash Player versions 11.1.112.61 and prior for Android 4.x Adobe Flash Player versions 11.1.111.5 and prior for Android 3.x and prior ABSTRACT: Multiple vulnerabilities have been reported in Adobe Flash Player, which can be exploited by malicious people to conduct cross-site scripting attacks, bypass certain security restrictions, and compromise a user's system. reference LINKS: Adobe Security Bulletin Secunia Advisory 48033 IMPACT ASSESSMENT: High Discussion: Multiple vulnerabilities have been reported in Adobe Flash Player, which

459

TO: Procurement Directors FROM: Director Contracts and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 DATE: June 21, 2012 TO: Procurement Directors FROM: Director Contracts and Financial Assistance Policy Division Office of Acquisition and Project Management SUBJECT: Department of Energy (DOE) Audit Guidance for For-Profit Recipients SUMMARY: Policy Flash 2012-39 provided the final audit guidance documents for independent audit forms to use in conducting compliance audits of for-profit recipients of federal financial assistance from DOE for FY 2011 and thereafter. Attached are FAQs to answer some questions we have received about the guidance. This Flash will be available online at the following website: http://energy.gov/management/office-management/operational- management/procurement-and-acquisition/policy-flashes.

460

Recovery News Flashes | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery News Flashes Recovery News Flashes Recovery News Flashes RSS September 1, 2011 Workers Complete Asbestos Removal at West Valley to Prepare Facility for Demolition American Recovery and Reinvestment Act workers safely cleared asbestos from more than 5,500 feet of piping in the Main Plant Process Building. Project completion is an important step in preparing the former commercial nuclear fuel reprocessing building for demolition. August 29, 2011 Idaho Workers Complete Last of Transuranic Waste Transfers Funded by Recovery Act American Recovery and Reinvestment Act workers successfully transferred 130 containers of remote-handled transuranic waste – each weighing up to 15 tons – to a facility for repackaging and shipment to a permanent disposal location.

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Recovery News Flashes | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery News Flashes Recovery News Flashes Recovery News Flashes RSS January 29, 2013 "TRU" Success: SRS Recovery Act Prepares to Complete Shipment of More Than 5,000 Cubic Meters of Nuclear Waste to WIPP With the American Recovery and Reinvestment Act funding, Savannah River Site (SRS) continues to safely treat and dispose of radioactive waste created while producing materials for nuclear weapons throughout the Cold War. The DOE site in Aiken, S.C., is safely, steadily, and cost-effectively making progress to analyze, measure, and then carefully cleanup or dispose of legacy transuranic (TRU) waste remaining at SRS after the lengthy nuclear arms race. November 2, 2012 Recovery Act Exceeds Major Cleanup Milestone, DOE Complex Now 74 Percent Remediated The Office of Environmental Management's (EM) American Recovery and

462

EM News Flashes | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

News Flashes News Flashes EM News Flashes RSS December 23, 2013 Aspen Cass, a relative of an EM Carlsbad Field Office (CBFO) employee, holds donated coats with Farok Sharif (left), president and project manager of Nuclear Waste Partnership, the WIPP management and operating contractor, and Joe Franco, manager of CBFO. EM Waste Isolation Pilot Plant Team's Holiday Spirit Shines CARLSBAD, N.M. - Children in the Carlsbad area are warmer this holiday season thanks to the generosity of EM's Waste Isolation Pilot Plant (WIPP) team of employees. December 11, 2013 Jim Kopotic and his daughter Lauren pause for a photo after a race that raised money for cancer research and treatment. 'Can Do' Attitude Brings EM Family Together OAK RIDGE, Tenn. - It's 7:51 a.m. on a Tuesday morning. A white,

463

EM News Flashes | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

News Flashes News Flashes EM News Flashes RSS September 13, 2012 Pictured here is the Integrated Waste Treatment Unit's off-gas filter following the June incident. Idaho Site Launches Corrective Actions Before Restarting Waste Treatment Facility IDAHO FALLS, Idaho - The Idaho site and its cleanup contractor have launched a series of corrective actions they will complete before safely resuming startup operations at the Integrated Waste Treatment Unit (IWTU) following an incident in June that caused the new waste treatment facility to shut down. September 11, 2012 Wastren-EnergX Mission Support (WEMS) Senior Safety Engineer Marsha Bevins, left, stands with DOE Director of Worker Safety and Health Brad Davy while holding her Voluntary Protection Program Contractor Champion of the Year award and the 2012 Star of Excellence award WEMS received.

464

Type B Accident Investigation of the January 10, 2006, Flash...  

Office of Environmental Management (EM)

January 10, 2006, Flash Fire and Injury at the Savannah River National Laboratory Type B Accident Investigation of the January 10, 2006, Flash Fire and Injury at the Savannah River...

465

Sunset science. III. Visual adaptation and green flashes  

Science Journals Connector (OSTI)

Photographs of green flashes do not preclude a role for physiological effects in these phenomena. While green flashes are certainly not after-images, there is compelling evidence that...

Young, Andrew T

2000-01-01T23:59:59.000Z

466

TERRESTRIAL GAMMA-RAY FLASH PRODUCTION BY LIGHTNING  

E-Print Network (OSTI)

TERRESTRIAL GAMMA-RAY FLASH PRODUCTION BY LIGHTNING A DISSERTATION SUBMITTED TO THE DEPARTMENT gamma-ray flashes (TGFs) are brief flashes of gamma-rays originating in the Earth's atmosphere) that extends from below 25 keV to above 20 MeV. When good lightning data exists, TGFs are closely associated

467

MICROSECOND-SCALE ELECTRIC FIELD PULSES IN CLOUD LIGHTNING FLASHES  

E-Print Network (OSTI)

-149- 30F3 MICROSECOND-SCALE ELECTRIC FIELD PULSES IN CLOUD LIGHTNING FLASHES Y. Villanueva, V tape-recorded data) for ground flashes by Rakov et al. [5]. Note that the K process in a lightning-scale pulses in different stages of cloud flashes in Florida and New Mexico are analyzed. The pulse occurrence

Florida, University of

468

TO: Procurement Directors FROM: Director, Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 DATE: April 7, 2011 TO: Procurement Directors FROM: Director, Policy Division Office of Procurement and Assistance Policy Office of Procurement and Assistance Management SUBJECT: Publication of Federal Acquisition Circular 2005-51 SUMMARY: Attached for your information is a summary of Federal Acquisition Circular 2005-51 which makes two changes to the Federal Acquisition Regulation involving the small business program and a modification of Standard Form 26. This Flash and its attachment will be available online within a day, at the following website: http://www.management.energy.gov/policy_guidance/policy_flashes.htm. Federal Acquisition Circulars may be found, in both their Federal Register notice form and in loose leaf form at: https://www.acquisition.gov/far/.

469

Attachment FY2011-55 OPAM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1, Summary of Small Business 1, Summary of Small Business Administration and Department of Energy Partnership Agreement Reference: FAR 19.8 Overview Recently, the Secretary and the Administrator of the Small Business Administration (SBA) executed a Partnership Agreement to expedite the award of requirements pursuant to section 8(a) of the Small Business Act. It will remain in effect through September 30, 2012. A copy is attached. This section discusses the effects of that Partnership Agreement on the way Department of Energy (DOE) contracting officers process awards under the 8(a) Program. Background Section 8(a) of the Small Business Act provides for the award of contracts to the SBA and the award of a subcontract to a small disadvantaged businesses accepted into the SBA's 8(a)

470

T-627: Adobe Flash Player Memory Corruption | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Adobe Flash Player Memory Corruption 7: Adobe Flash Player Memory Corruption T-627: Adobe Flash Player Memory Corruption May 20, 2011 - 2:50pm Addthis PROBLEM: Adobe Flash Player Memory Corruption, Denial Of Service, Execute Code PLATFORM: Windows, Mac OS X, Linux, and Solaris ABSTRACT: Adobe Flash Player before 10.3.181.14 on Windows, Mac OS X, Linux, and Solaris and before 10.3.185.21 on Android allows remote attackers to execute arbitrary code or cause a denial of service (memory corruption) via crafted Flash content, as possibly exploited in the wild in May 2011 by a Microsoft Office document with an embedded .swf file. reference LINKS: CVE Details - CVE-2011-0627 CVE Details - Adobe Flash Player Vulnerability Statistics CVE Details - Adobe Security Vulnerabilities IMPACT ASSESSMENT: High Discussion:

471

T-576: Oracle Solaris Adobe Flash Player Multiple Vulnerabilities |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Oracle Solaris Adobe Flash Player Multiple Vulnerabilities 6: Oracle Solaris Adobe Flash Player Multiple Vulnerabilities T-576: Oracle Solaris Adobe Flash Player Multiple Vulnerabilities March 14, 2011 - 3:05pm Addthis PROBLEM: Oracle has acknowledged multiple vulnerabilities in Adobe Flash Player included in Solaris, which can be exploited by malicious people to compromise a user's system. PLATFORM: Sun Solaris 10 ABSTRACT: Oracle Solaris Adobe Flash Player Multiple Vulnerabilities. reference LINKS: Secunia Advisory: SA43747 Oracle Sun Advisory: CVE Multiple Vulnerabilities in Adobe Flash Player Secure List: SA43747 Oracle Sun Support Adobe Flash Player for Linux and Solaris IMPACT ASSESSMENT: High Discussion: Oracle has acknowledged multiple vulnerabilities in Solaris, which can be exploited by malicious people to disclose sensitive information, bypass

472

Electrical Safety and Arc Flash Protections  

SciTech Connect

Over the past four years, the Electrical Safety Program at PPPL has evolved in addressing changing regulatory requirements and lessons learned from accident events, particularly in regards to arc flash hazards and implementing NFPA 70E requirements. This presentation will discuss PPPL's approaches to the areas of electrical hazards evaluation, both shock and arc flash; engineered solutions for hazards mitigation such as remote racking of medium voltage breakers, operational changes for hazards avoidance, targeted personnel training and hazard appropriate personal protective equipment. Practical solutions for nominal voltage identification and zero voltage checks for lockout/tagout will also be covered. Finally, we will review the value of a comprehensive electrical drawing program, employee attitudes expressed as a personal safety work ethic, integrated safety management, and sustained management support for continuous safety improvement.

R. Camp

2008-03-04T23:59:59.000Z

473

Flash pyrolysis and hydropyrolysis of biomass  

SciTech Connect

Process chemistry data on the flash pyrolysis and hydropyrolysis of wood is being obtained in a 1'' downflow entrained tubular reactor. The data indicates that at residence times of <1 second, and 900 to 1000/sup 0/C and 500 psi pressure, the flash hydropyrolysis of wood yields mainly methane and water. As the residence time increases to >3 seconds, the products are methane and CO. Almost complete conversion of the carbon to methane and CO are obtained in these experiments. At lower temperatures, in the order of 800/sup 0/C, 500 psi and residence times <4 seconds, significant amounts of benzene and ethane are produced. The experimental process chemistry data have been used to design and evaluate two processes in a preliminary manner. One process converts wood to high BTU pipeline gas and the other to methanol and chemical feedstocks consisting of benzene and ethylene. Reasonable plant investments which compare favorably with coal conversion plant estimates are derived.

Not Available

1982-08-01T23:59:59.000Z

474

Fraud Policy Governance Policy  

E-Print Network (OSTI)

Fraud Policy Governance Policy © Victoria University of Wellington Page 1 1 Purpose The purpose of this policy is to address the risk of fraud and to lay out the actions the University will take when any suspected fraud is reported or discovered and should be read in conjunction with the Student Conduct Statute

Frean, Marcus

475

OFFICIAL POLICY Ethics Policy  

E-Print Network (OSTI)

OFFICIAL POLICY Ethics Policy 1.0 PREFACE It is the intent of this Ethics Policy to state those standards of ethical conduct that are expected of all members of the College Community. These standards must the minimum standards of ethical conduct that are required by South Carolina law and reflect the aspirations

Kasman, Alex

476

Flash flooding events in south central Texas  

E-Print Network (OSTI)

. Heights in Peters. (Fran Henry, 1981 I. TABLE 1. Station information for Del Rio, Stephenville, and Victoria (from Henry, 1981). Station Name Station Number Call Elevation Letters m Latitude Lon itude Del Rio 72261 Stephenville 72Z60 Victoria... Totals Index (TTI) was computed for each rawinsonde station using the following formula: 16 TABLE 5. Neteorological elements used to determine the state of the atmosphere orior to flash flooding events over South Central Texas in a triangular area...

Utley, Tom Wilson

2012-06-07T23:59:59.000Z

477

3800 Green Series Cost Elements | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(formerly EPP) Program 3800 Green Series Cost Elements 06112014 (Rev. 7) 3800 Green Series Cost Elements More Documents & Publications 1 OPAM Policy Acquisition Guides...

478

Photovoltaics at DOE's National Renewable Energy Laboratory License...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(PV) power purchase agreement (PPA). nrelpvlicense.pdf More Documents & Publications USA RS Basic Contract - Contract No.: DE-RW0000005 Aligned Partnerships OPAM Policy...

479

Thermal Decomposition of Molecules Relevant to Combustion and Chemical Vapor Deposition by Flash Pyrolysis Time-of-Flight Mass Spectrometry  

E-Print Network (OSTI)

of Small Molecules by Flash Pyrolysis, University ofwas performed using flash pyrolysis vacuum-ultraviolet time-Vapor Deposition by Flash Pyrolysis Time-of-Flight Mass

Lemieux, Jessy Mario

2013-01-01T23:59:59.000Z

480

Arc Flash Boundary Calculations Using Computer Software Tools  

SciTech Connect

Arc Flash Protection boundary calculations have become easier to perform with the availability of personal computer software. These programs incorporate arc flash protection boundary formulas for different voltage and current levels, calculate the bolted fault current at each bus, and use built in time-current coordination curves to determine the clearing time of protective devices in the system. Results of the arc flash protection boundary calculations can be presented in several different forms--as an annotation to the one-line diagram, as a table of arc flash protection boundary distances, and as printed placards to be attached to the appropriate equipment. Basic arc flash protection boundary principles are presented in this paper along with several helpful suggestions for performing arc flash protection boundary calculations.

Gibbs, M.D.

2005-01-07T23:59:59.000Z

Note: This page contains sample records for the topic "opam policy flash" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

A Flashing Binary Combined Cycle For Geothermal Power Generation | Open  

Open Energy Info (EERE)

Flashing Binary Combined Cycle For Geothermal Power Generation Flashing Binary Combined Cycle For Geothermal Power Generation Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: A Flashing Binary Combined Cycle For Geothermal Power Generation Details Activities (0) Areas (0) Regions (0) Abstract: The performance of a flashing binary combined cycle for geothermal power generation is analysed. It is proposed to utilize hot residual brine from the separator in flashing-type plants to run a binary cycle, thereby producing incremental power. Parametric variations were carried out to determine the optimum performance of the combined cycle. Comparative evaluation with the simple flashing plant was made to assess its thermodynamic potential and economic viability. Results of the analyses indicate that the combined cycle can generate 13-28% more power than the

482

Administration Policy Complete Policy Title  

E-Print Network (OSTI)

Administration Policy Complete Policy Title: McMaster University Alcohol Policy Policy Number, 1998 Supersedes/Amends Policy dated: May 11, 1998 Responsible Executive: Vice-President (Administration policy and the written copy held by the policy owner, the written copy prevails. INTRODUCTION Mc

Haykin, Simon

483

Digital Photography with Flash and No-Flash Image Pairs Georg Petschnigg Maneesh Agrawala Hugues Hoppe  

E-Print Network (OSTI)

: This candlelit setting from the wine cave of a castle is difficult to photograph due to its low light nature include denoising and detail transfer (to merge the ambient qualities of the no-flash image with the high demonstrate how these applications can synthesize new images that are of higher quality than either

Cohen, Michael

484

Ionization Chambers in the FLASH Dump Line  

E-Print Network (OSTI)

. 7, 2010FLASH Seminar, Dec. 7, 2010 BPM 13DUMP Dump Line Upgrade 2009Dump Line Upgrade 2009 BPM 9DUMP BPM 5DUMP Toroid 9DUMP OTR screen 9DUMP BLM 14DUMP BLM 13.1DUMP 13.2DUMP BLM 9DUMP BLM 6DUMP BLM 1.1DUMP 1.2DUMP BPM 10DUMP BPM 16DUMP 8 x BHM 16DUMP BLM 14R.DUMP 14L.DUMP 14U.DUMP 14D.DUMP Ionization

485

767JUNE 2003AMERICAN METEOROLOGICAL SOCIETY | ositive lightning discharges (flashes) are defined  

E-Print Network (OSTI)

767JUNE 2003AMERICAN METEOROLOGICAL SOCIETY | P ositive lightning discharges (flashes) are defined (flashes) that transfer to ground both positive and negative charges are termed bipolar lightning common than positive lightning. Currently available observations of bipolar lightning flashes, which can

Florida, University of

486

Flash Memory Garbage Collection in Hard Real-Time Systems  

E-Print Network (OSTI)

-date behavior and time consuming garbage collection mechanism, NAND-based flash memory is difficult to integrate into hard-real-time embedded systems. In this thesis, I propose a performance model for flash memory garbage collection that can be used...

Lai, Chien-An

2012-10-19T23:59:59.000Z

487

Terrestrial gamma ray flash production by active lightning leader channels  

E-Print Network (OSTI)

Terrestrial gamma ray flash production by active lightning leader channels B. E. Carlson,1 N. G 28 October 2010. [1] The production of terrestrial gamma ray flashes (TGFs) requires a seed energetic electron source and a strong electric field. Lightning leaders naturally provide seed electrons by cold

Bergen, Universitetet i

488

Microfluidic Flow-Flash: Method for Investigating Protein Dynamics  

E-Print Network (OSTI)

Microfluidic Flow-Flash: Method for Investigating Protein Dynamics Michael W. Toepke, Scott H Institute, Troy, New York 12180 We report a new method, microfluidic flow-flash, for measuring protein reaction kinetics. The method couples a microscope imaging detection system with a microfluidic flow cell

Kenis, Paul J. A.

489

T-607: Update: Adobe Acrobat, Reader, and Flash Player SWF File...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reader, and Flash Player SWF File Processing Arbitrary Code Execution Vulnerability T-607: Update: Adobe Acrobat, Reader, and Flash Player SWF File Processing Arbitrary Code...

490

Thermo-fluid Dynamics of Flash Atomizing Sprays and Single Droplet Impacts  

E-Print Network (OSTI)

in two-phase flashing propane jets. Part one: velocitymeasurements in two-phase propane releases . in Proceedingsin two-phase flashing propane jets. Part one: velocity

Vu, Henry

2010-01-01T23:59:59.000Z

491

POLICY: A:VPFA # / Purchasing Policy PROCEDURES  

E-Print Network (OSTI)

POLICY: A:VPFA # / Purchasing Policy PROCEDURES: APPENDIX: Approved: April 1, 2013 Revised: Cross References: Purchasing Policy Capital Projects and Renovations Policy Conflict of Interest Policy Sustainability Policy Green Procurement Policy 1 of 9 PROCEDURES: Purchasing Policy AUTHORITY: University

Martin, Jeff

492

TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 9 DATE: May 2, 2013 TO: Procurement Directors FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Updated Reporting Requirement Checklist including the Research Performance Progress Report (RPPR) SUMMARY: Policy Flash 2011-63 transmitted the previous versions of the Reporting Requirements Checklists and the Research Performance Progress Report (RPPR) which was an attachment to the checklist. This Flash transmits a combined checklist which replaces both of the previous checklists. The RPPR has also been incorporated into the checklist. Additional updates were necessary including: correcting web site addresses, removing references to subawards for audits of

493

Microsoft Word - FORM46002.doc | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2.doc Microsoft Word - FORM46002.doc Microsoft Word - FORM46002.doc More Documents & Publications DOE F 4600.2 ATTACHMENT FLASH 2011-46(6) Attachment FY2011-63 OPAM...

494

Monthly Flash Estimates of Electric Power Data  

Gasoline and Diesel Fuel Update (EIA)

7/22/2011 7/22/2011 Table of Contents 1. Commentary Page 1 2. Key Indicators of Generation, Consumption & Stocks Page 2 3. Month-to-Month Comparisons: Generation, Consumption and Stocks (Total) Page 3 4. Net Generation Trends Page 4 5. Fossil Fuel Consumption Trends Page 5 6. Fossil Fuel Stock Trends Page 6 7. Average Number of Days of Burn Non-Lignite Coal Page 7 8. Month-to-Month Comparisons: Electric Power Retail Sales and Average Prices Page 8 9. Retail Sales Trends Page 9 10. Average Retail Price Trends Page 10 11. Heating and Cooling Degree Days Page 11 12. Documentation Page 12 Monthly Flash Estimates of Data for: May 2011 Section 1. Commentary Electric Power Data The contiguous United States experienced temperatures that were slightly below normal in May 2011.

495

Monthly Flash Estimates of Electric Power Data  

Gasoline and Diesel Fuel Update (EIA)

Burn Non-Lignite Coal Burn Non-Lignite Coal Page 7 8. Month-to-Month Comparisons: Electric Power Retail Sales and Average Prices Page 8 9. Retail Sales Trends Page 9 10. Average Retail Price Trends Page 10 11. Heating and Cooling Degree Days Page 11 12. Documentation Page 12 Monthly Flash Estimates of Data for: October 2010 Section 1. Commentary Electric Power Data In October 2010, the contiguous United States experienced temperatures that were above average. Accordingly, the total population-weighted heating degree days for the United States were 15.6 percent below the October normal. Retail sales of electricity remained relatively unchanged from October 2009. Over the same period, the average U.S. retail price of electricity increased 1.8 percent. For the 12-month period ending October 2010, the average U.S.

496

Monthly Flash Estimates of Electric Power Data  

Gasoline and Diesel Fuel Update (EIA)

6/24/2011 6/24/2011 Table of Contents 1. Commentary Page 1 2. Key Indicators of Generation, Consumption & Stocks Page 2 3. Month-to-Month Comparisons: Generation, Consumption and Stocks (Total) Page 3 4. Net Generation Trends Page 4 5. Fossil Fuel Consumption Trends Page 5 6. Fossil Fuel Stock Trends Page 6 7. Average Number of Days of Burn Non-Lignite Coal Page 7 8. Month-to-Month Comparisons: Electric Power Retail Sales and Average Prices Page 8 9. Retail Sales Trends Page 9 10. Average Retail Price Trends Page 10 11. Heating and Cooling Degree Days Page 11 12. Documentation Page 12 Monthly Flash Estimates of Data for: April 2011 Section 1. Commentary Electric Power Data The contiguous United States experienced temperatures that were above normal in April 2011.

497

Monthly Flash Estimates of Electric Power Data  

Gasoline and Diesel Fuel Update (EIA)

9/20/2011 9/20/2011 Table of Contents 1. Commentary Page 1 2. Key Indicators of Generation, Consumption & Stocks Page 2 3. Month-to-Month Comparisons: Generation, Consumption and Stocks (Total) Page 3 4. Net Generation Trends Page 4 5. Fossil Fuel Consumption Trends Page 5 6. Fossil Fuel Stock Trends Page 6 7. Average Number of Days of Burn Non-Lignite Coal Page 7 8. Month-to-Month Comparisons: Electric Power Retail Sales and Average Prices Page 8 9. Retail Sales Trends Page 9 10. Average Retail Price Trends Page 10 11. Heating and Cooling Degree Days Page 11 12. Documentation Page 12 Monthly Flash Estimates of Data for: July 2011 Section 1. Commentary Electric Power Data The contiguous United States experienced temperatures

498

Flash photolysis-shock tube studies  

SciTech Connect

Even though this project in the past has concentrated on the measurement of thermal bimolecular reactions of atomic species with stable molecules by the flash or laser photolysis-shock tube (FP- or LP-ST) method using atomic resonance absorption spectrometry (ARAS) as the diagnostic technique, during the past year the authors have concentrated on studies of the thermal decompositions of selected chlorocarbon molecules. These studies are necessary if the degradation of chlorine containing organic molecules by incineration are to be understood at the molecular level. Clearly, destruction of these molecules will not only involve abstraction reactions, when possible, but also thermal decomposition followed by secondary reactions of the initially formed atoms and radicals. Studies on the thermal decomposition of CH{sub 3}Cl are complete, and the curve-of-growth for Cl-atom atomic resonance absorption has been determined. The new thermal decomposition studies are similar to those already reported for CH{sub 3}Cl.

Michael, J.V. [Argonne National Laboratory, IL (United States)

1993-12-01T23:59:59.000Z

499

Article coated with flash bonded superhydrophobic particles  

DOE Patents (OSTI)

A method of making article having a superhydrophobic surface includes: providing a solid body defining at least one surface; applying to the surface a plurality of diatomaceous earth particles and/or particles characterized by particle sizes ranging from at least 100 nm to about 10 .mu.m, the particles being further characterized by a plurality of nanopores, wherein at least some of the nanopores provide flow through porosity, the particles being further characterized by a plurality of spaced apart nanostructured features that include a contiguous, protrusive material; flash bonding the particles to the surface so that the particles are adherently bonded to the surface; and applying a hydrophobic coating layer to the surface and the particles so that the hydrophobic coating layer conforms to the nanostructured features.

Simpson, John T (Clinton, TN) [Clinton, TN; Blue, Craig A (Knoxville, TN) [Knoxville, TN; Kiggans, Jr., James O [Oak Ridge, TN

2010-07-13T23:59:59.000Z

500

Scannerless loss modulated flash color range imaging  

DOE Patents (OSTI)

Scannerless loss modulated flash color range imaging methods and apparatus are disclosed for producing three dimensional (3D) images of a target within a scene. Apparatus and methods according to the present invention comprise a light source providing at least three wavelengths (passbands) of illumination that are each loss modulated, phase delayed and simultaneously directed to illuminate the target. Phase delayed light backscattered from the target is spectrally filtered, demodulated and imaged by a planar detector array. Images of the intensity distributions for the selected wavelengths are obtained under modulated and unmodulated (dc) illumination of the target, and the information contained in the images combined to produce a 3D image of the target.

Sandusky, John V. (Albuquerque, NM); Pitts, Todd Alan (Rio Rancho, NM)

2008-09-02T23:59:59.000Z