Powered by Deep Web Technologies
Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

CFN Ops Plan | Work Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations Plan Operations Plan Work Planning & Control for Experiments and Operations All experimental work will be conducted in accordance with Work Planning and Control for Experiments and Operations, which ensures proper design and operation of all experiments prior to their commencement. CFN will use the SBMS provided standard form for the formal documentation. The Lead Experimenter/Responsible person will notify the Experimental Safety Review Committee of any new experiments or modifications to existing experiments. CFN will appoint an Experimental Safety Review Committee. This committee will consist of the Experiment Review Coordinator, CFN personnel, Facility Support Representative (FSR), Environmental Compliance Representative (ECR). Additional subject matter experts may be appointed on an ad-hoc

2

Microsoft Word - AL-Consolidated Approps FY 2008 as of feb 21...  

Office of Environmental Management (EM)

Consolidated Approps FY 2008 as of feb 21 2008 final.doc Microsoft Word - AL-Consolidated Approps FY 2008 as of feb 21 2008 final.doc Microsoft Word - AL-Consolidated Approps FY...

3

Treasury, Postal Approp's Act (11/19/95) PL 104-52  

Broader source: Energy.gov (indexed) [DOE]

96 Appropriations Chronology (Draft) 96 Appropriations Chronology (Draft) CR (9/30/95) went through 11/13 PL 104-31 MilCon Approp's Act (10/3/95) PL 104-32 Agriculture Approp's Act (10/21/95) PL 104-37 Energy/Water Approp's Act (11/13/95) PL 104-46 Transportation Approp's Act (11/15/95) PL 104-50 Treasury, Postal Approp's Act (11/19/95) PL 104-52 Legislative Approp's Act (11/19/95) PL 104-53 CR (11/19/95) 11/14 through 11/20 PL 104-54 CR (11/20/95) through 12/15 PL 104-56 Defense Approp's Act (12/1/95) PL 104-61 Approp's for AFDC, VA, DC (12/22/95) PL 104-69 CR for DC (1/4/96) through 1/25 PL 104-90 Various Approp's (1/6/96) PL 104-92 CR (1/6/96) through 1/26 PL 104-94 Various Approp's (1/26/96) PL 104-99

4

Congressional House Senate Current Request Marks Marks Approp  

Broader source: Energy.gov (indexed) [DOE]

2 2 FY 2012 FY 2012 FY 2012 ($ in thousands) Congressional House Senate Current Request Marks Marks Approp FOSSIL ENERGY R&D Coal 291,358 289,415 291,358 359,320 Natural Gas Technologies 0 15,000 0 14,575 Unconventional Fossil Energy Technologies 0 0 0 4,858 Program Direction 159,233 120,847 151,729 119,929 Plant & Capital Equipment 16,794 16,794 16,794 16,794 Environmental Restoration 7,897 7,897 7,897 7,897 Special Recruitment Program 700 700 700 700 Subtotal, Fossil Energy R&D 475,982 450,653 468,478 524,073 Use of prior year balances -23,007 -23,007 -23,007 0 Rescission of prior year balances 0 0 -187,000 -187,000 TOTAL FOSSIL ENERGY R&D 452,975 427,646 258,471 337,073 STRATEGIC PETROLEUM RESERVE Facilities Development 192,704 192,704 192,704 192,704 Rescission of prior year balances

5

Microsoft Word - PSRP May 15 2009 _WAPA Implementation Approp_ Final.docx  

Broader source: Energy.gov (indexed) [DOE]

Implementation Approp) Final.docx Implementation Approp) Final.docx PSRP Name: WAPA Recovery Act Implementation Appropriation PSRP Lead Program Office and/or Laboratory/Site Office: Western Area Power Administration PSRP Lead Manager: Tim Meeks phone: (720) 962-7077 e-mail: tmeeks@wapa.gov address: P.O. Box 281213 Lakewood, CO 80228-8213 Does this program align with an existing PART program? No Does this program align with an existing CFDA program? No Program Title WAPA Recovery Act Implementation Appropriation 1. Objectives: Program Purpose Title IV, section 402, of the American Recovery and Reinvestment Act of 2009 (Recovery Act) provided Western with $10 million of non-reimbursable funding to implement borrowing

6

OPERATIONS (OPS)  

Broader source: Energy.gov (indexed) [DOE]

OPS) OPS) OBJECTIVE OPS.1 The formality and discipline of operations is adequate to conduct work safely and programs are in place to maintain this formality and discipline. (CR 13) Scope: The Conduct of Operations Program was evaluated during the recent KE Basin FTS ORR and was found to be adequately implemented. Based on this result and the subsequent program enhancements, the scope of the review is to be limited to the SWS operating and maintenance evolutions. Criteria * Programmatic elements of conduct of operations are in place for SWS operations. (DOE Order 5480.19) * The SWS operations personnel adequately demonstrate the principles of conduct of operations requirements during the shift performance period. (DOE Order 5480.19)

7

Operations Directorate (OPS Directorate)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operations Directorate (OPS Directorate) Operations Directorate (OPS Directorate) Purpose A group chartered by the Associate Laboratory Director for the Advanced Photon Source that includes the responsible Division Directors and other appropriate APS operations personnel. The Operations Directorate collectively coordinates operating decisions that affect the facility as a whole and establishes both long- and short-term schedules, including scheduled maintenance and facility improvement periods. The Operations Directorate is the APS forum in which decisions regarding operations are discussed: These include, but are not limited to: Safety issues related to operations Operational Schedule Global operating parameters within the defined and approved operational and safety envelopes, such as energy, maximum circulating beam

8

K:Career Development Center/Co-op/Co-op Handbook/Co-op Handbook for Norse Recruiting Co-op/Internship Handbook  

E-Print Network [OSTI]

K:Career Development Center/Co-op/Co-op Handbook/Co-op Handbook for Norse Recruiting Co-op/Internship Handbook College of Business majors Students in the Haile/US Bank College of Business must submit their co).* · Once you begin the Experiential Learning form, you must complete it; the system does not allow you

Boyce, Richard L.

9

OP-XMP-61 1 / 5 Princeton Plasma Physics Laboratory  

E-Print Network [OSTI]

) Independent Review ES&H Review MINOR MODIFICATIONS #12;OP-XMP-61 2 / 5 REVIEWERS (designated by RLM the standard calibration of the MPTS system using Raman scattering from nitrogen gas in the vacuum vessel confirmation that the calibration technique is well understood, and additional scientific insight. 3. Plan

Princeton Plasma Physics Laboratory

10

Minutes Ops mtg 1210005  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

November 2, 2012 November 2, 2012 10:30 - 11:30 AM Minutes Attendees: Marshall Granados, Abdi Salehi, Thomas Schenkel, Pat Thomas, Herb Toor, Csaba Toth, Theresa Triplett, Linnea Wahl 1. ES&H News and Lessons Learned: News: * AFRD Safety Week -- We are planning to have an "AFRD Safety Week" November 26-30. Programs can schedule either 1 whole day or 2 half-days to devote to safety. * Each Program is responsible for identifying electrical equipment surveyors by November 1, 2012. * Supervisor Safety Plan activity reports for FY12 are now overdue. Best Practices from AFRD, ALS & Engineering Spot Awards: AFRD Programs are encouraged to nominate people you observe contributing to our safety for spot awards through the safety spot award website at:

11

Microsoft Word - RHUBC_OpsPlan.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

for the campaign, one for each of three PWV ranges: a) 1.5 mm < PWV < 2 mm: A dataset of 2-3 hours will be taken corresponding to the launch of a single radiosonde. b) 1.0...

12

Minutes Ops mtg 120706  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6, 2012 6, 2012 10:30 - 11:30 AM Minutes Attendees: Ken Barat, Thomas Schenkel, Peter Seidl, Pat Thomas, Herb Toor, Csaba Toth, Linnea Wahl, Weyland Wong 1. ES&H News and Lessons Learned: News: * Chemical and gas cylinder clean-outs - EHS is organizing some chemical and gas cylinder clean-out efforts this summer. If you have old "orphaned" gas cylinders from a previous vendor or damaged cylinders that you have been having difficulties getting picked up, please contact Pat Thomas so they can be included in the clean-out. EHS is planning to bring in a contractor that can pick up the unwanted cylinders. * Goats have arrived - The herd of goats has been seen grazing on dry grass and brush around the Lab to reduce fire risk. When the goats are

13

Minutes Ops mtg 120302  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

March 2, 2012 March 2, 2012 10:30 - 11:30 AM Minutes Attendees: Ken Barat, Robert Fairchild, Tom McVeigh, Gregg Penn, Abdi Salehi, Peter Seidl, Pat Thomas, Csaba Toth, Weyland Wong, Justine Woo 1. ES&H News and Lessons Learned: News: * Laser Safety Training - Ken Barat is providing a series of special in- depth laser safety training classes: o Session 3 is scheduled on March 8 and will cover non- traditional laser systems o Session 4 is scheduled on March 22 and will cover regulations and standards, engineering and administrative controls * Working Alone Policy - The AFRD ISM Plan has been updated to incorporate the requirements of the Working Alone policy (PUB-3000, Chapter 5, Section 5.3). See the AFRD ISM web page for changes. * Focus Area Self-Assessments - The Lessons Learned/Near Hits and

14

Minutes Ops mtg 100110  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

B-290 Conference Room B-290 Conference Room October 1, 2010 2:00 - 3:00 PM Minutes Attendees: Katherine Johnson, Tom McVeigh, Tom Scarvie, Peter Seidl, Xiaorong Wang 1. Program Forum ALS Accelerator Physics has moved into their new offices in Bldg. 15. The LBNL ergonomist visited their offices. Fusion reports that construction of NDCX-2 is progressing. They are working on the girder to support the rails. They expect to be doing seismic securing in October. There will be a DOE review, but it is not specific to safety. Wayne Greenway has been preparing for a furnace that will be coming in within the next two weeks. Joe Dionne has reviewed the plans for gas use, and the Fire Marshall has been contacted. IBT is preparing to move a neutron generator from Bldg. 52 to 71A. They are

15

FY 2007 Operating Plan for DOE--March 16, 2007.xls  

Broader source: Energy.gov (indexed) [DOE]

Operating Plan by Appropriation Operating Plan by Appropriation (Dollars in Thousands) FY 2006 FY 2007 FY 2008 Current Operating Congressional Approp. Plan Request Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy supply and conservation Operation and maintenance........................................... 1,781,242 2,065,474 2,187,943 Construction.................................................................... 31,155 89,030 ---- Total, Energy supply and conservation.............................. 1,812,397 2,154,504 2,187,943 Fossil energy programs Clean coal technology..................................................... -20,000 ---- -58,000 Fossil energy research and development....................... 580,669 592,621 566,801

16

OP-PR-0010-001.PDF  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OP-PR-0010-001.doc Student Caretaker Date: 20000830 1. Assure that your name appears on the "Student Caretaker Authorization List" (OP-AL-0010-001.doc). 2. Place your name,...

17

Weerwoord op het commentaar van Jansen en Havermans  

Science Journals Connector (OSTI)

Marlies Marissen en Ingmar Franken reageren op het kritische commentaar van Anita Jansen en Remco Havermans op hun artikel Heeft...

Dr. Marlies Marissen; Dr. Ingmar Franken

2006-12-01T23:59:59.000Z

18

OP-PO-0010-001.PDF  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OP-PO-0010-001.doc Student Caretaker Date: 20000830 1. Introduction: To increase the accessibility of photon beams, especially for non-CAMD staff, LSUCAMD has initiated the...

19

On-Line Renewals Spring 2015 Co-op Timeline  

E-Print Network [OSTI]

On-Line Renewals Spring 2015 Co-op Timeline All students applying for Co-ops &/or Internships must for Spring 2015 Co-op ( Renewals are for Co-ops only). Also Work Term Evaluations will be accepted. November 10, 2014 Earliest date for submitting Coop Renewals to start working (on January 12th ) December 1

Heller, Barbara

20

The CO-OP Guide  

SciTech Connect (OSTI)

You are at D0, the newest and most advanced experiment at Fermilab. Its goal is to find the 'top quark', nicknamed 'truth'. theoretically one of the six fundamental building blocks of matter. Combinations of the six quarks are said to make up electrons, protons and neutrons. Your group at D0 is the cryogenic division. Its goal is to provide and maintain a cryogenic system which ultimately supplies and controls the liquid argon used in the giant cryostats for the experiment. The high purity liquid argon is needed to keep the detector modules inside the cryostats cold, so that they will operate properly. Your job at D0 is to be a co-op for the research and development group of the cryogenics division. Your goals are dependent on the needs of the cryo group. D0 is where you will spend most of your time. The co-op office is located on what is known as the 3rd floor, but is actually on the ground floor. The floor directly above the 3rd floor is the 5th floor, which contains your immediate superiors and the D0 secretary. The 6th and top floor is above that, and contains the D0 secretary for official and important business. On the other side of the D0 assembly building is the cryo control room. This is where the cryogenic piping system is remotely monitored and controlled. Other important sites at D0 include the trailer city on the north parking lot, which has the D0 secretary who handles all the payroll matters (among other duties), and the portakamp in the south parking lot. Besides D0, which is named for its location on the particle accelerator ring. the most important place is Wilson Hall. That is the large building shaped like a big Atact symbol. It contains various important people such as the safety group. the personnel department (which you have already encountered. being hired), the minor stock room, the cafeteria, the Fermi library. Ramsey Auditorium. etc. Behind Wilson Hall is the Booster Ring, which accelerates particles before they are injected into the main ring. Inside the booster ring are the East and West Booster towers, which contain cryogenic support groups. The D0 cryo group offices used to be in the West Booster Portakamps. Away from Wilson Hall, there are various buildings strewn about the Fermilab property that have important functional uses to D0. One such example is Lab A. This is where the now unused bubble chamber resides. which was used to take pictures of particle motion. Many of our group is from the bubble chamber, and occasionally stories from the 'bubble chamber days' can be heard as someone waxes nostalgic. Lab A has a machine shop and many technicians. All three of the cryostats used in the D0 experiment went through Lab A for preparation and installation work. Lab A is located directly up the road from the front of Wilson Hall (north-east). Its unmistakable dark geodesic dome makes it easy to find. The Feynman Computer building, located east and just a little bit north of Wilson Hall, houses the computer repair people. If any of the computers used in our group crash and burn, we must take them to the third floor of Feynman to be fixed or exchanged. On one side is the Prep department, which handles the VAX mainframe computers, and on the other is personal computer repair, which handles Fermi Macs and IBMs. Directly north of Wilson Hall is Site 38. This site is the location of many important Fermilab facilities, such as the Fermi fire department, the carpenter's shop, the Fermi gas pumps, the main stock room, and shipping and receiving. Lastly, but perhaps most significantly, is the Fermilab Village. In addition to the machine shops, the cut shop, welding facilities, and the garishly painted physicist dorms, there are such things as a gym, a pool and other facilities to take the edge off a weary mind. The village is located just north off Batavia road on the east side of Fermilab. The village barn is the first and most notable building as one approaches.

Michael, J.; /Fermilab

1991-08-16T23:59:59.000Z

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Fl YO Co -op E athea lectric  

E-Print Network [OSTI]

are based on a false premise that the cost and usage pattern for energy in the Pacific Northwest should and Energy Efficiency The High Level indicator of "Regional Electricity Use per Person vs. US Average" shouldFl YO Co -op E athea lectric Community...Integrity...Reliability 2510 U.S. Highway 2 East

22

Energy Department Names Virginia and Illinois Electric Co-ops...  

Broader source: Energy.gov (indexed) [DOE]

Names Virginia and Illinois Electric Co-ops the 2013 Wind Cooperatives of the Year Energy Department Names Virginia and Illinois Electric Co-ops the 2013 Wind Cooperatives of the...

23

PP/OP 02.07 Utilities Addendum  

E-Print Network [OSTI]

PP/OP 02.07 Utilities Addendum LOCKOUT/TAGOUT POLICY SECTION OF UTILITIES ADDENDUM PURPOSE (Lockout/Tagout)." (See PP/OP 02.07 for reference to this Act.) It is imperative that a clear distinction

Gelfond, Michael

24

1079 Adressen Zorginstellingen Verkrijgbaar Op Cd-Rom  

Science Journals Connector (OSTI)

Adressen van zorginstellingen uit de database van ZorgGids Nederland zijn nu verkrijgbaar op twee cd-roms. Op de ene cd staan de NAWT-gegevens van 1.700 zorginstellingen in Nederland onderverdeeld per provincie.

2009-07-01T23:59:59.000Z

25

Co-op & Internship Workshop Viterbi Career Services (VCS)  

E-Print Network [OSTI]

;Cooperative Education (Co-op) and Internship Workshop Cooperative Education ­ What is Cooperative Education Elective Credit May alternate with Academic Semesters #12;Benefits of a Co-op Why Co-op? Apply knowledge in a "real world" work environment Maintain full-time student status while working Receive technical elective

Wang, Hai

26

Current CO-OP Open Positions | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Current CO-OP Open Positions Position 1: Electrical Engineer Student The Electronics Group of the High Energy Physics Division seeks two Electrical Engineering undergraduate...

27

PP/OP 08.05 PHYSICAL PLANT  

E-Print Network [OSTI]

PP/OP 08.05 PHYSICAL PLANT OPERATING POLICY AND PROCEDURE PP/OP 08.05: Department of Utilities Awards Program DATE: February 16, 2009 PURPOSE The purpose of the Physical Plant Operating Policy burden, more timely accomplishment of assigned tasks, safe practices, or other operational improvements

Gelfond, Michael

28

OP-XMP-56 1 / 5 Princeton Plasma Physics Laboratory  

E-Print Network [OSTI]

&H Review MINOR MODIFICATIONS #12;OP-XMP-56 2 / 5 REVIEWERS (designated by RLM) Organization/Position Name Signature ATI Test Director Independent Reviewer NB RF Diagnostics TRAINING (designated by RLM) Training Operations Procedure Requirements designated by RLM NSTX Work Permit T-MOD (OP-AD-03) Independent Review ES

Princeton Plasma Physics Laboratory

29

PP/OP 02.07 PHYSICAL PLANT  

E-Print Network [OSTI]

PP/OP 02.07 PHYSICAL PLANT OPERATING POLICY AND PROCEDURE PP/OP 02.07 Lockout/Tagout Program DATE for the lockout/tagout of machines/equipment having the potential for unexpected release of stored energy or maintenance is being performed under lockout or tagout, or whose job requires him/her to work in an area

Gelfond, Michael

30

Property:AvgAnnlGrossOpCpcty | Open Energy Information  

Open Energy Info (EERE)

AvgAnnlGrossOpCpcty AvgAnnlGrossOpCpcty Jump to: navigation, search Property Name AvgAnnlGrossOpCpcty Property Type Number Description Avg. Annual Gross Operating Capacity(MW). Pages using the property "AvgAnnlGrossOpCpcty" Showing 6 pages using this property. F Faulkner I Energy Generation Facility + 49.5 + N Navy I Geothermal Facility + 81.7 + Navy II Geothermal Facility + 86 + Neal Hot Springs Geothermal Power Plant + 22 + North Brawley Geothermal Power Plant + 50 + R Raft River Geothermal Facility + 11.5 + Retrieved from "http://en.openei.org/w/index.php?title=Property:AvgAnnlGrossOpCpcty&oldid=400186#SMWResults" Categories: Properties Geothermal Energy Generation Facilities properties What links here Related changes Special pages Printable version

31

Deputy Secretary Daniel Poneman USA Today Op-Ed September 13...  

Broader source: Energy.gov (indexed) [DOE]

Deputy Secretary Daniel Poneman USA Today Op-Ed September 13, 2011 Deputy Secretary Daniel Poneman USA Today Op-Ed September 13, 2011 091411Poneman USA Today op-ed.pdf More...

32

Facility Ops | U.S. DOE Office of Science (SC)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facility Ops Facility Ops High Energy Physics (HEP) HEP Home About Research Facilities Facility Ops Experiments at the Energy Frontier Experiments at the Intensity Frontier Experiments at the Cosmic Frontier Projects, Missions, and Status HEP User Facilities Science Highlights Benefits of HEP Funding Opportunities Advisory Committees News & Resources Contact Information High Energy Physics U.S. Department of Energy SC-25/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3624 F: (301) 903-2597 E: sc.hep@science.doe.gov More Information » Facilities Facility Ops Print Text Size: A A A RSS Feeds FeedbackShare Page The Facility Operations division supports major operations at the Fermilab Tevatron Complex, U.S. LHC Operations, and operations at other labs as

33

High School Co-op Program Recruitment Calendar  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Recruitment Calendar High School Co-op Program Recruitment Calendar Point your career towards Los Alamos Lab: work with the best minds on the planet in an inclusive environment...

34

Attachment A PP/OP 03.08  

E-Print Network [OSTI]

Attachment A PP/OP 03.08 Page 1 04/02/2010 STANDARDS OF APPRENTICESHIP FOR Texas Tech University a trade as outlined in these standards. "Apprenticeship Committee" shall mean a twelve-member group.............................................................................................3 HVAC Mechanic

Gelfond, Michael

35

On Metre in the Rondo of Brahms's Op. 25  

E-Print Network [OSTI]

The rondo from Brahms's Piano Quartet Op. 25 projects a number of different metres which may be organised into various metric spaces modelled on those of David Lewin and Richard Cohn. Although this organisation does not ...

Murphy, Scott

2007-01-01T23:59:59.000Z

36

Identificatie & Regelaar Tuning: Een Stukje Hardheid op de Tafel  

E-Print Network [OSTI]

1 Identificatie & Regelaar Tuning: Een Stukje Hardheid op de Tafel R.A. de Callafon On the occasion Tafel: Robust Estimation for Automatic Control Tuning (REACT) Motivation & Illustration Some Details

Langendoen, Koen

37

Start uw eigen web dialoog op www.lucide.info  

Science Journals Connector (OSTI)

Website Bent u bestuurder of toezichthouder bij een zorginstelling? Bent u alleen ge nteresseerd, of wilt u gewoon meepraten met de mensen die het in de zorg voor het zeggen hebben? Op de websit...

2014-03-01T23:59:59.000Z

38

Applications of the LM392 Comparator Op Amp IC  

E-Print Network [OSTI]

Applications of the LM392 Comparator Op Amp IC The LM339 quad comparator and the LM324 op amp operation and ease of use has contributed to the wide range of applications for these devices. The LM392 FIGURE 1. 00749302 Q1, Q2, Q3 = 2N2369 Q4 = 2N2907 C1, A1 = LM392 amplifier-comparator dual *1% metal

Lanterman, Aaron

39

Application of Boiler Op for combustion optimization at PEPCO  

SciTech Connect (OSTI)

Title IV requires the reduction of NOx at all stations within the PEPCO system. To assist PEPCO plant personnel in achieving low heat rates while meeting NOx targets, Lehigh University`s Energy Research Center and PEPCO developed a new combustion optimization software package called Boiler Op. The Boiler Op code contains an expert system, neural networks and an optimization algorithm. The expert system guides the plant engineer through a series of parametric boiler tests, required for the development of a comprehensive boiler database. The data are then analyzed by the neural networks and optimization algorithm to provide results on the boiler control settings which result in the best possible heat rate at a target NOx level or produce minimum NOx. Boiler Op has been used at both Potomac River and Morgantown Stations to help PEPCO engineers optimize combustion. With the use of Boiler Op, Morgantown Station operates under low NOx restrictions and continues to achieve record heat rate values, similar to pre-retrofit conditions. Potomac River Station achieves the regulatory NOx limit through the use of Boiler Op recommended control settings and without NOx burners. Importantly, any software like Boiler Op cannot be used alone. Its application must be in concert with human intelligence to ensure unit safety, reliability and accurate data collection.

Maines, P.; Williams, S. [Potomac Electric Power Co., Upper Marlsboro, MD (United States); Levy, E. [Lehigh Univ., Bethlehem, PA (United States). Energy Research Center

1997-09-01T23:59:59.000Z

40

WC_1999_006_CLASS_WAIVER_FOR_BECHTEL_RESEARCH_AND_CO-OP_AGRE...  

Broader source: Energy.gov (indexed) [DOE]

9006CLASSWAIVERFORBECHTELRESEARCHANDCO-OPAGRE.pdf WC1999006CLASSWAIVERFORBECHTELRESEARCHANDCO-OPAGRE.pdf WC1999006CLASSWAIVERFORBECHTELRESEARCHANDCO-OP...

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Updated 10/2012 Alcohol/Substance Abuse Treatment OP/IOP/PHP*  

E-Print Network [OSTI]

Updated 10/2012 Alcohol/Substance Abuse Treatment OP/IOP/PHP* Please note patient or family member, some limitations with Medicare 4 Adult locations with OP, IOP, and sometimes PHP 1) Plainville 2) New-OP, IOP, PHP; Primary Substance Abuse-OP, IOP; Senior Program > 55y.o., alcohol only substance, take

Oliver, Douglas L.

42

Conduct of operations implementation plan  

SciTech Connect (OSTI)

This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

Anderson, C.K.; Hall, R.L.

1991-02-20T23:59:59.000Z

43

Edgar Electric Co-op, Assn | Open Energy Information  

Open Energy Info (EERE)

op, Assn op, Assn Jump to: navigation, search Name Edgar Electric Co-op, Assn Place Illinois Utility Id 5531 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Rate 10 - Unmetered Outdoor Lighting(100 Watt Decorative Lighting) Lighting Rate 10 - Unmetered Outdoor Lighting(100 Watt HPS) Lighting Rate 10 - Unmetered Outdoor Lighting(175 Watt Mercury Vapor) Lighting Rate 10 - Unmetered Outdoor Lighting(400 Watt Directional HPS) Lighting Rate 10 - Unmetered Outdoor Lighting(Transformer Fee) Lighting

44

Cloverland Electric Co-op | Open Energy Information  

Open Energy Info (EERE)

Cloverland Electric Co-op Cloverland Electric Co-op Jump to: navigation, search Name Cloverland Electric Co-op Place Michigan Utility Id 3828 Utility Location Yes Ownership C NERC Location RFC NERC RFC Yes ISO MISO Yes Operates Generating Plant Yes Activity Generation Yes Activity Buying Transmission Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Commercial Heating and Air Conditioning Commercial Commercial Heating and Air Conditioning - Industrial Industrial Farm and Home Residential Rate (RES1) Residential General Service-Commercial (GEN2) Commercial

45

Microsoft Word - PSRP May 15 2009 _WAPA Implementation Approp...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

maintaining, or studying construction of new or upgraded electric power transmission lines and related facilities with at least one terminus within the area served by Western;...

46

AFRD Ops Minutes 5-6-2011  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

May 6, 2011 May 6, 2011 10:30-11:30 AM Minutes Attendees: Ken Barat, Gang Huang, Tom McVeigh, Gregg Penn, Abdi Salehi, Tom Scarvie, Peter Seidl, Pat Thomas, Herb Toor, Csaba Toth 1. Lessons Learned: * Back strain - An Engineering technician matrixed to Supercon experienced back pain while lifting a spool of cable weighing approximately 30 pounds onto a truck. The accident is being investigated by Engineering Division. Supercon is considering ways to avoid the need for manual lifting and they are also re- arranging their storage to reduce the risk of strains. While the weight lifted was within LBNL standards, other factors should be considered when planning a manual lift, such as individual capabilities, locations that could require awkward postures or twisting to execute a lift, whether the load is difficult to grasp, etc.

47

OP-XP-807 1 / 10 Princeton Plasma Physics Laboratory  

E-Print Network [OSTI]

as possible consistent with the spectra exhibiting all Eb, Eb/2 and Eb/3 NB injection energy components to particle pitch angle. The shaded green regions in Fig. 1 show that measurements at approximately half energy spectrum can be obtained at Rtan ~ 40 cm giving v||/v ~ 0.45 ­ 0.50. #12;OP-XP-807 3 / 10 3

Princeton Plasma Physics Laboratory

48

PP/OP 06.02 PHYSICAL PLANT  

E-Print Network [OSTI]

for Drawings and Equipment from Engineering Services DATE: May 10, 2010 PURPOSE This Physical Plant Operating the Engineering Services area. REVIEW This Physical Plant Operating Policy/Procedure (PP/OP) will be reviewed in April of each even numbered year (ENY) by the associate director for physical plant engineering services

Gelfond, Michael

49

OP-XMP-54 1 / 6 Princeton Plasma Physics Laboratory  

E-Print Network [OSTI]

) Organization/Position Name Signature ATI D. Mueller Test Director Independent Reviewer NB RF Diagnostics Requirements designated by RLM MINOR MODIFICATIONS #12;OP-XMP-54 2 / 6 REVIEWERS (designated by RLM TRAINING (designated by RLM) Training required: No Yes Instructor _____________________ Personnel (group

Princeton Plasma Physics Laboratory

50

SLAC Management Systems Larry Dardzinski/Ops/x4794  

E-Print Network [OSTI]

SLAC Management Systems PPA Update 24 May 12 Larry Dardzinski/Ops/x4794 #12;Outline · Management · Discussion Page 2 #12;A simple definition of a Management System A management system is the means by which of Management Systems? · Allow your customers and users to efficiently and effectively access your services

Wechsler, Risa H.

51

PP/OP 02.07 Engineering Services Addendum  

E-Print Network [OSTI]

PP/OP 02.07 Engineering Services Addendum 01/05/2011 LOCKOUT AND TAGOUT POLICY Engineering Services Energy (Lockout/Tagout). b. Chapter XVII §1910.306(c); Elevators, dumbwaiters, escalators 29CFR), it will be the policy of Engineering Services to coordinate any needed tagout/lockout with the Utilities and/or Building

Gelfond, Michael

52

PP/OP 02.07 BMC Addendum  

E-Print Network [OSTI]

PP/OP 02.07 BMC Addendum 01/05/2011 LOCKOUT AND TAGOUT POLICY BUILDING MAINTENANCE AND CONSTRUCTION ADDENDUM Specifications for and Usage of Lockout and Tagout Devices: 1. Procedures: Only designated supervisors, operators, or maintenance personnel will perform lockout and tagout procedures. The supervisor

Gelfond, Michael

53

PP/OP 02.07 BMC Addendum  

E-Print Network [OSTI]

PP/OP 02.07 BMC Addendum Attachment A 01/05/2011 ATTACHMENT A LOCKOUT/TAGOUT PROCEDURES FOR BUILDING MAINTENANCE AND CONSTRUCTION PERSONNEL A. General: Lockout is the preferred method of isolating the requirements of OSHA standard, however, the following simple procedure is provided for use in both lockout

Gelfond, Michael

54

Handleiding eduroam op Apple iOS6  

E-Print Network [OSTI]

Handleiding eduroam op Apple iOS6 Version: 1.0 eduroam Date: 24-04-2013 #12;2 Inleiding Deze handleiding beschrijft hoe u met uw Apple iPad of iPhone met iOS6 een verbinding met eduroam kan opzetten

Galis, Frietson

55

ARM - Field Campaign - 2001 Philadelphia NE-OPS Air Quality Experiment  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Philadelphia NE-OPS Air Quality Experiment Comments? We would love to hear from you Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : 2001 Philadelphia NE-OPS Air...

56

Co-op advertising and pricing models in manufacturerretailer supply chains Jinxing Xie *, Alexandre Neyret  

E-Print Network [OSTI]

Co-op advertising and pricing models in manufacturer­retailer supply chains Jinxing Xie August 2008 Available online 12 September 2008 Keywords: Co-op advertising Pricing Supply chain Game theory a b s t r a c t Cooperative (co-op) advertising plays a significant role in marketing programs

Xie, Jinxing

57

United Electric Co-op, Inc | Open Energy Information  

Open Energy Info (EERE)

United Electric Co-op, Inc United Electric Co-op, Inc Place Idaho Utility Id 19502 Utility Location Yes Ownership C NERC Location WECC NERC WECC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png AUTOMATIC OUTDOOR LIGHTING (100W HPS WITHOUT POLE) Lighting AUTOMATIC OUTDOOR LIGHTING(100W HPS WITH POLE) Lighting GENERAL SERVICE(SINGLE PHASE RATE) Commercial GENERAL SERVICE(THREE PHASE RATE) Commercial IRRIGATION RATE Commercial LARGE COMMERCIAL (500-1,000 KW) Commercial MUNICIPAL STREET LIGHTING (100 W HPS-CITY OF ACEQUIA) Lighting MUNICIPAL STREET LIGHTING(100W HPS-CITY OF PAUL) Lighting

58

Shelby Energy Co-op, Inc | Open Energy Information  

Open Energy Info (EERE)

Energy Co-op, Inc Energy Co-op, Inc Place Kentucky Utility Id 17044 Utility Location Yes Ownership C NERC Location SERC NERC SERC Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png 100 Watt Decorative Colonial Light Lighting 100 Watt Security Light Lighting 150 Watt Decorative Acorn Light Lighting 250 Watt Directional Flood and Security and Street Light Lighting 400 Watt Directional Flood and Security and Street Light Lighting General Service - Rate 11 Industrial General Service - Rate 11 - Three Phase Commercial Large Industrial Rate - Schedule B1 Industrial

59

SUBJECT: Statement of Clearance - Decontamination Op'erations;  

Office of Legacy Management (LM)

Statement of Clearance - Decontamination Op'erations; Statement of Clearance - Decontamination Op'erations; Raritan Arsenal TO: Comtnanding General U. S. Army Supply and Maintenance Command ,kTTN: iii-LSSM.-S" * 9T ;/ i-~'-~-.-y/"+,,y-- Washingto,n, D. C. 20315 ;l. Reference: ~Paragraph 5b, AR 405-90. : : 2. Forwarded for approval are a.Stateinent of Clearance afld supporting 'documents covering the decontamination of the Ammuhition Arca at Raritan Arsellal, Mctuchen, New Jersey. I I 3. Transl%ittal of the Statement of Clearance was deferred pend- iny, the removal of the scrap material from the Arsenal, referred to in pa'ragraph 6 of CMT 1 of the supporting documents. This action was completed 5 December 1963. i 4. The Statement-of Clearance and supporting documents 'Bre to be forwaided to District Engineer, New York District, 80 Lafayette Street,

60

PANEL OP CONSULTrnS MEETING ON RULISON  

Office of Legacy Management (LM)

PANEL OP CONSULTrnS MEETING ON RULISON PANEL OP CONSULTrnS MEETING ON RULISON . - . . .. W V E Y GAP DAM) .. . . .. . N E V m OPERATIONS OFFICE Reported By: ( 2 - I / RTiXN0T.S ELECTRICAL U. ENGINEERING CO., INC., J 4 - .I, / I i Q b OFFICE OF COORDINATOR-BOARDS & PANELS This page intentionally left blank S.GETY PANEL 0 7 CC'_

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

FY 2009 Statistical Table  

Broader source: Energy.gov (indexed) [DOE]

Statistical Table by Appropriation Statistical Table by Appropriation (dollars in thousands - OMB Scoring) FY 2007 FY 2008 FY 2009 Current Current Congressional Op. Plan Approp. Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy.......................... -- 1,722,407 1,255,393 -467,014 -27.1% Electricity delivery and energy reliability........................... -- 138,556 134,000 -4,556 -3.3% Nuclear energy................................................................. -- 961,665 853,644 -108,021 -11.2% Legacy management........................................................ -- 33,872 -- -33,872 -100.0% Energy supply and conservation Operation and maintenance..........................................

62

FY 2009 Control Table by Appropriation  

Broader source: Energy.gov (indexed) [DOE]

Control Table by Appropriation Control Table by Appropriation (dollars in thousands - OMB Scoring) FY 2007 FY 2008 FY 2009 Current Current Congressional Op. Plan Approp. Request $ % Discretionary Summary By Appropriation Energy And Water Development, And Related Agencies Appropriation Summary: Energy Programs Energy efficiency and renewable energy.......................... -- 1,722,407 1,255,393 -467,014 -27.1% Electricity delivery and energy reliability........................... -- 138,556 134,000 -4,556 -3.3% Nuclear energy.................................................................. -- 961,665 853,644 -108,021 -11.2% Legacy management........................................................ -- 33,872 -- -33,872 -100.0% Energy supply and Conservation...................................... 2,145,149 -- -- -- -- Fossil energy programs

63

Sandia National Laboratories: Careers: Internships & Co-ops: Technical  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Technical Institute Programs Technical Institute Programs Internships & Co-ops Technical Institute Programs Computer Science Research Institute Enabling Predictive Simulation Research Institute Energy Surety Incubator Interns for Security, Arms Control, and Force Protection Engineering National Security Engineering Institute Physical Sciences Institute Sandia Institute for Modeling and Simulation Science of Extreme Environments Research Institute TITANS: Center for Analysis Systems and Applications TITANS: Center for Cyber Defenders TITANS: Monitoring Systems and Technology Intern Center How to Apply Intern Benefits Intern FAQs Fellowships Postdoctoral Positions Campus Recruiting Careers Technical Institute Programs Scientist working with lab equipment Critical skills of critical importance

64

New Hampshire Electric Co-Op - Small Business Energy Solutions | Department  

Broader source: Energy.gov (indexed) [DOE]

New Hampshire Electric Co-Op - Small Business Energy Solutions New Hampshire Electric Co-Op - Small Business Energy Solutions New Hampshire Electric Co-Op - Small Business Energy Solutions < Back Eligibility Commercial Industrial Savings Category Other Appliances & Electronics Commercial Lighting Lighting Program Info State New Hampshire Program Type Utility Rebate Program Rebate Amount Up to 50% of the cost Provider New Hampshire Electric Co-Op New Hampshire Electric Co-Op offers incentives for its small commercial customers (those using less than 100 kW) through the Small Business Energy Solutions Program. The Co-op will conduct a free assessment of a company's energy consumption, recommend efficiency improvements to reduce consumption, and provide rebates of up to 50% toward the cost of implementing the recommendations. Eligible improvements include: lighting

65

Index of /research/alcator/facility/Procedures/OPS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OPS OPS [ICO] Name Last modified Size Description [DIR] Parent Directory - [TXT] BAKE_CHECKLIST.TXT 25-Oct-2000 16:13 127 [TXT] CRYO_STARTUP_AFTER_A_SHUTDOWN.HTML 20-Oct-2003 07:00 11K [TXT] Cryostat_Fiber_Glassing_Procedure.html 30-Apr-2002 14:43 1.5K [TXT] ECDC_PROCEDURE.HTML 09-Jan-2001 17:25 11K [TXT] GDC.HTML 01-Sep-2005 11:23 8.1K [TXT] GDC.OLD.HTML 09-Jan-2001 17:25 3.1K [TXT] GLOW_CHECKLIST.TXT 25-Oct-2000 16:13 421 [TXT] GLOW_START_STOP.TXT 30-Nov-2000 17:58 2.0K [DIR] INDIVIDUAL_RUN_PROCEDURES/ 22-May-2012 12:38 - [TXT] LN2_VALVE_ADJ_PROC.HTML 09-Jan-2001 17:25 3.0K [TXT] PRE_RUN_ENGINEERING_STARTUP.HTML 09-Jan-2001 17:24 2.8K [TXT] PRE_RUN_POWER_ROOM_TURN_ON_PROCEDURE.html 23-Mar-2006 16:52 12K

66

Management Plan Management Plan  

E-Print Network [OSTI]

; and 5) consistency with the Endangered Species Act and Clean Water Act. In addition, the management plan Plan, Management Plan Page MP­ 1 #12;Management Plan water quality standards, instream flows, privateManagement Plan Management Plan "Management and restoration programs for native salmonids have

67

Winning with Wind: Electric Co-ops Providing Clean Energy to Customers  

Office of Energy Efficiency and Renewable Energy (EERE)

Electric co-ops are increasingly turning to wind power as a clean, reliable source of energy that slashes carbon emissions and protects the environment. The Energy Department and National Rural Electric Cooperative Association recently recognized two electric co-ops that demonstrate leadership in wind energy: Old Dominion Electric Cooperative of Virginia and the Rural Electric Convenience Cooperative (RECC) of Illinois.

68

Nonlinear Retrieval of Atmospheric Profiles from MetOp-IASI and MTG-IRS Data  

E-Print Network [OSTI]

Nonlinear Retrieval of Atmospheric Profiles from MetOp-IASI and MTG-IRS Data Gustavo Camps-Vallsa , Luis Guanterb , Jordi Mu~noz-Mar´ia , Luis G´omez-Chovaa and Xavier Calbetc a Image Processing retrieval methods to derive cloud, surface and atmospheric properties from hyperspectral MetOp-IASI and MTG

Camps-Valls, Gustavo

69

Secretary Chu's Weatherization Op-Ed in the Huffington Post | Department of  

Broader source: Energy.gov (indexed) [DOE]

Weatherization Op-Ed in the Huffington Post Weatherization Op-Ed in the Huffington Post Secretary Chu's Weatherization Op-Ed in the Huffington Post October 30, 2009 - 12:00am Addthis (Washington, DC) - Today, the Huffington Post Published an Op-Ed from U.S. Energy Secretary Chu in honor of National Weatherization Day. The text of the Op-ed is below: Weatherization: Saving Money by Saving Energy Published: October 30, 2009 in the Huffington Post I've always been a bit of an energy efficiency nut. I've made it my mission to cut the utility bills at every home we've owned. Long before I learned about the risks of climate change, I was fanatical about energy efficiency because I'm cheap. Whenever my wife and I move into a new home, I check the attic for adequate insulation. I look for leaks around doors and windows and install a

70

New Hampshire Electric Co-Op - Solar Hot Water | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

New Hampshire Electric Co-Op - Solar Hot Water New Hampshire Electric Co-Op - Solar Hot Water New Hampshire Electric Co-Op - Solar Hot Water < Back Eligibility Residential Savings Category Heating & Cooling Solar Water Heating Maximum Rebate $1,500 Program Info State New Hampshire Program Type Utility Rebate Program Rebate Amount 20% of installed costs Provider New Hampshire Electric Co-Op New Hampshire Electric Co-Op (NHEC) offers rebates to residential customers who install qualified solar water-heating systems. The rebate is equal to 20% of installed system costs, with a maximum award of $1,500. Systems must be pre-approved, and installed in NHEC's service territory by a qualified installer. Program funds are available on a first-come, first-served basis. See the program web site listed above for more information, an application

71

Milk, Eggs and Solar: Grocery Co-Op Puts Photovoltaics to Work | Department  

Broader source: Energy.gov (indexed) [DOE]

Milk, Eggs and Solar: Grocery Co-Op Puts Photovoltaics to Work Milk, Eggs and Solar: Grocery Co-Op Puts Photovoltaics to Work Milk, Eggs and Solar: Grocery Co-Op Puts Photovoltaics to Work September 2, 2010 - 12:15pm Addthis Maya Payne Smart Former Writer for Energy Empowers, EERE Grocery shoppers in Burlington, Vt., are picking up much more than food and household items these days. Strolling the aisles of community-owned City Market, the 3,000 daily customers also learn about the co-op's 136 rooftop photovoltaic panels and monthly "Solar Made Simple" seminars. Reducing energy demand With freezer and refrigerator units running 24/7, energy demand is high at the 16,000 square foot store. The co-op's electricity bill averaged $17,000 a month. With the solar energy system, its conventional energy use is expected to

72

Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Strategic Plan science-innovationassetsimagesicon-science.jpg Strategic Plan x Strategic Plan Los Alamos National Laboratory Strategic Plan - 2014 (pdf) Our Strategic Plan...

73

Kauai Island Utility Co-op (KIUC) PV integration study.  

SciTech Connect (OSTI)

This report investigates the effects that increased distributed photovoltaic (PV) generation would have on the Kauai Island Utility Co-op (KIUC) system operating requirements. The study focused on determining reserve requirements needed to mitigate the impact of PV variability on system frequency, and the impact on operating costs. Scenarios of 5-MW, 10-MW, and 15-MW nameplate capacity of PV generation plants distributed across the Kauai Island were considered in this study. The analysis required synthesis of the PV solar resource data and modeling of the KIUC system inertia. Based on the results, some findings and conclusions could be drawn, including that the selection of units identified as marginal resources that are used for load following will change; PV penetration will displace energy generated by existing conventional units, thus reducing overall fuel consumption; PV penetration at any deployment level is not likely to reduce system peak load; and increasing PV penetration has little effect on load-following reserves. The study was performed by EnerNex under contract from Sandia National Laboratories with cooperation from KIUC.

Ellis, Abraham; Mousseau, Tom (Knoxville, TN)

2011-08-01T23:59:59.000Z

74

Microsoft PowerPoint - FTCP FY12 Ops Plan Goal 3 Qtrly Reports conclusions.pptx  

Broader source: Energy.gov (indexed) [DOE]

Recommendations to the FTCP Recommendations to the FTCP FTCP Quarterly Report - Determine if the FTCP Quarterly Report Continues to Fulfill a Useful Function or if it Should Be Report Continues to Fulfill a Useful Function, or if it Should Be Revised or Discontinued  Task 1: Review and evaluate the original purpose and need filled  Task 1: Review and evaluate the original purpose and need filled by the quarterly report to determine if they have been satisfied or continue.  Task 2: Interview/poll a sample of recipients to determine if the p p p report provides value commensurate with the effort to produce, or if different information would provide greater value.  Task 3: Analyze the results of the surveys to determine if it

75

SUMMARY PLAN DESCRIPTION Plan Name: MCWAH Vision Plan [Plan # 505  

E-Print Network [OSTI]

to pay for such coverage. Review this summary plan description and the documents governing the planSUMMARY PLAN DESCRIPTION Plan Name: MCWAH Vision Plan [Plan # 505] Plan Type: Group Vision Insurance Plan Year: July 1 ­ June 30 Employer\\Policyholder\\Plan Administrator\\Plan Sponsor: Medical College

76

New Hampshire Electric Co-Op - Large Business Energy Solutions | Department  

Broader source: Energy.gov (indexed) [DOE]

New Hampshire Electric Co-Op - Large Business Energy Solutions New Hampshire Electric Co-Op - Large Business Energy Solutions New Hampshire Electric Co-Op - Large Business Energy Solutions < Back Eligibility Commercial Industrial Savings Category Manufacturing Other Appliances & Electronics Commercial Lighting Lighting Program Info State New Hampshire Program Type Utility Rebate Program Rebate Amount Air Compressors: $120 - $200/HP Additional Compressed Air Storage: $2.75/gallon LED Traffic Light: $60 - 80/unit Light Fixtures: $10 - $150/unit Lighting Controls: $25 - $50/unit Motors (Open Drip Proof): $75 - $2,110 Motors (Totally Enclosed Fan Cooled: $85 - $3,295 ECM Motors: $75/unit Variable Speed Drives: $1,050 - $4,400 Custom: lesser of 35% of the total installed cost or buy down to 1 year pay Provider New Hampshire Electric Co-Op

77

Op-Ed by Secretary of Energy Steven Chu and Secretary of Labor Hilda Solis:  

Broader source: Energy.gov (indexed) [DOE]

Op-Ed by Secretary of Energy Steven Chu and Secretary of Labor Op-Ed by Secretary of Energy Steven Chu and Secretary of Labor Hilda Solis: Building the American Clean Energy Economy Op-Ed by Secretary of Energy Steven Chu and Secretary of Labor Hilda Solis: Building the American Clean Energy Economy April 22, 2009 - 12:00am Addthis To commemorate Earth Day, the op-ed below on green jobs and energy independence by Secretaries Steven Chu and Hilda Solis ran in the following papers yesterday and today: Austin American-Statesman Buffalo News Denver Post Montgomery Advertiser Omaha World Herald Pittsburgh Post-Gazette Building the American Clean Energy Economy By Secretary of Energy Steven Chu and Secretary of Labor Hilda Solis Today, Americans will join with people around the world in celebrating Earth Day, raising awareness about the plight of our natural resources and

78

Secretary Chu Op-Ed on Energy Efficiency from the World Economic Forum |  

Broader source: Energy.gov (indexed) [DOE]

Op-Ed on Energy Efficiency from the World Economic Op-Ed on Energy Efficiency from the World Economic Forum Secretary Chu Op-Ed on Energy Efficiency from the World Economic Forum March 16, 2010 - 12:00am Addthis Washington, DC -- An op-ed by Secretary Steven Chu appears in a new report by the World Economic Forum and IHS Cambridge Energy Research Associates entitled "Energy Vision 2010: Towards a More Energy Efficient World." Read the full report (pdf- 1,456kb). The Secretary's piece is below and attached: Energy Efficiency: Achieving the Potential By Steven Chu, U.S. Secretary of Energy For the next few decades, energy efficiency is one of the lowest cost options for reducing US carbon emissions. Many studies have concluded that energy efficiency can save both energy and money. For example, a recent McKinsey report calculated the potential

79

New Hampshire Electric Co-Op- New Equipment and Construction Program  

Broader source: Energy.gov [DOE]

New Hampshire Electric Co-Op offers incentives to its commercial and industrial customers to encourage energy efficiency. The program targets any commercial/industrial member building a new...

80

BPA, electric co-op and irrigation district testing aquifer recharge  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Wednesday, April 4, 2012 CONTACT: Doug Johnson, 503-230-5840 or 503-230-5131 BPA, electric co-op and irrigation district testing aquifer recharge Dispatching recharge pumping...

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

New Hampshire Electric Co-Op- Residential Solar Photovoltaic Incentive Program  

Broader source: Energy.gov [DOE]

New Hampshire Electric Co-op (NHEC) is offering rebates for residential, grid-tied photovoltaic (PV) systems up to one megawatt (MW) in capacity. The rebate is equal to 20% of the installed cost of...

82

New Hampshire Electric Co-Op- Residential Energy Efficiency Rebate Programs  

Broader source: Energy.gov [DOE]

New Hampshire Electric Co-Op provides a number of energy efficiency incentive programs for residential members. First, members can receive a free Home Energy Analysis through the [http://www.nhec...

83

OPS 9.16 Procedure Content and Use 8/24/98 | Department of Energy  

Energy Savers [EERE]

6 Procedure Content and Use 82498 OPS 9.16 Procedure Content and Use 82498 The objective of this surveillance is to evaluate the effectiveness of the contractor's program for...

84

Op-Ed by Secretary of Energy Steven Chu and Secretary of Labor...  

Energy Savers [EERE]

Economy April 22, 2009 - 12:00am Addthis To commemorate Earth Day, the op-ed below on green jobs and energy independence by Secretaries Steven Chu and Hilda Solis ran in the...

85

Secretary Chu Op-Ed on Small Modular Reactors in the Wall Street Journal |  

Broader source: Energy.gov (indexed) [DOE]

Op-Ed on Small Modular Reactors in the Wall Street Op-Ed on Small Modular Reactors in the Wall Street Journal Secretary Chu Op-Ed on Small Modular Reactors in the Wall Street Journal March 23, 2010 - 12:00am Addthis Washington, D.C. - Today, the Wall Street Journal published an op-ed by U.S. Secretary of Energy Steven Chu on small modular reactors. The op-ed can be viewed on the Wall Street Journal. The text of the op-ed is below: America's New Nuclear Option Small modular reactors will expand the ways we use atomic power. By Steven Chu Wall Street Journal, March 23, 2010 America is on the cusp of reviving its nuclear power industry. Last month President Obama pledged more than $8 billion in conditional loan guarantees for what will be the first U.S. nuclear power plant to break ground in nearly three decades. And with the new authority granted by the president's

86

Secretary Chu's Op-Ed on Small Modular Reactors in the Wall Street Journal  

Broader source: Energy.gov (indexed) [DOE]

Secretary Chu's Op-Ed on Small Modular Reactors in the Wall Street Secretary Chu's Op-Ed on Small Modular Reactors in the Wall Street Journal Secretary Chu's Op-Ed on Small Modular Reactors in the Wall Street Journal March 23, 2010 - 12:24pm Addthis Washington, D.C. - Today, the Wall Street Journal published an op-ed by U.S. Secretary of Energy Steven Chu on small modular reactors. The op-ed can be found here. The text of the op-ed is below: Small modular reactors will expand the ways we use atomic power. By Steven Chu, Secretary of Energy Wall Street Journal America is on the cusp of reviving its nuclear power industry. Last month President Obama pledged more than $8 billion in conditional loan guarantees for what will be the first U.S. nuclear power plant to break ground in nearly three decades. And with the new authority granted by the president's

87

Secretary Chu's Op-Ed on Small Modular Reactors in the Wall Street Journal  

Broader source: Energy.gov (indexed) [DOE]

Secretary Chu's Op-Ed on Small Modular Reactors in the Wall Street Secretary Chu's Op-Ed on Small Modular Reactors in the Wall Street Journal Secretary Chu's Op-Ed on Small Modular Reactors in the Wall Street Journal March 23, 2010 - 12:24pm Addthis Washington, D.C. - Today, the Wall Street Journal published an op-ed by U.S. Secretary of Energy Steven Chu on small modular reactors. The op-ed can be found here. The text of the op-ed is below: Small modular reactors will expand the ways we use atomic power. By Steven Chu, Secretary of Energy Wall Street Journal America is on the cusp of reviving its nuclear power industry. Last month President Obama pledged more than $8 billion in conditional loan guarantees for what will be the first U.S. nuclear power plant to break ground in nearly three decades. And with the new authority granted by the president's

88

ATTACHMENT A PP/OP 04.04  

E-Print Network [OSTI]

with the proposed means of financing the expenditures. Capital budget - An expenditure plan for adding into parts that are designated for expenditure by specific organizational unit and/or for specific purposes of an account according to a specified schedule of times and amounts. Appropriation - An expenditure

Gelfond, Michael

89

Secretary Chu's Weatherization Op-Ed in the Huffington Post | Department of  

Broader source: Energy.gov (indexed) [DOE]

Secretary Chu's Weatherization Op-Ed in the Huffington Post Secretary Chu's Weatherization Op-Ed in the Huffington Post Secretary Chu's Weatherization Op-Ed in the Huffington Post October 30, 2009 - 12:00am Addthis (Washington, DC) - Today, the Huffington Post Published an Op-Ed from U.S. Energy Secretary Chu in honor of National Weatherization Day. The text of the Op-ed is below: Weatherization: Saving Money by Saving Energy Published: October 30, 2009 in the Huffington Post I've always been a bit of an energy efficiency nut. I've made it my mission to cut the utility bills at every home we've owned. Long before I learned about the risks of climate change, I was fanatical about energy efficiency because I'm cheap. Whenever my wife and I move into a new home, I check the attic for adequate insulation. I look for leaks around doors and windows and install a

90

Itasca-Mantrap Co-op Electrical Assn | Open Energy Information  

Open Energy Info (EERE)

Itasca-Mantrap Co-op Electrical Assn Itasca-Mantrap Co-op Electrical Assn Jump to: navigation, search Name Itasca-Mantrap Co-op Electrical Assn Place Minnesota Utility Id 9475 Utility Location Yes Ownership C NERC Location MRO NERC MRO Yes Activity Distribution Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png Dual Fuel and Air Source Heat Pump Commercial Freedom Heating Commercial Irrigation - Controlled Industrial Irrigation - Uncontrolled Industrial Large Commercial Commercial Residential Residential Residential(Controlled Air Condition ) Residential Residential-Load Management(off peak) Residential

91

OPS 9.1 Operations Organization and Administration 8/24/98 | Department of  

Broader source: Energy.gov (indexed) [DOE]

Operations Organization and Administration 8/24/98 Operations Organization and Administration 8/24/98 OPS 9.1 Operations Organization and Administration 8/24/98 The objective of this surveillance is to verify that the operations organization has clearly defined roles and responsibilities and that those roles and responsibilities are understood by operations personnel. This surveillance also verifies that management goals and objectives with regard to safety and facility performance have been established and are understood by facility personnel. This surveillance provides a basis for evaluating the effectiveness of the contractor's program for operations organization and administration and for establishing compliance with DOE requirements. OPS9-01.doc More Documents & Publications OPS 9.18 Equipment and Piping Labeling 8/24/98

92

Operating Systems D:\\My Documents\\Training & Courses\\Lecture Courses\\G53OPS\\Handouts\\intro.docx  

E-Print Network [OSTI]

Operating Systems D:\\My Documents\\Training & Courses\\Lecture Courses\\G53OPS\\Handouts\\intro.docx Graham Kendall - 9/25/2008 - Page 1 of 1 G53OPS Operating Systems Handout Introduction These notes were information. What is an Operating System? Introduction Before we look at what an operating system does we

Kendall, Graham

93

OpTeC Annual Meeting Agenda 1 11 Sept. 2014 Optical Science & Engineering Conference  

E-Print Network [OSTI]

Devices for Polarization Control 9:05 am Tianbo Liu & David Dickensheets MSU Electrical and Computer in an SOFC #12;OpTeC Annual Meeting Agenda 2 11 Sept. 2014 9:40 am Alexander Mikhaylov,a Lauren Bennett

Maxwell, Bruce D.

94

Multiprocessor Architectures Using MultiHop MultiOPS Lightwave Networks and Distributed Control  

E-Print Network [OSTI]

­hop lightwave network called stack­Kautz, based on the Kautz graph. We show that this architecture is very cost Introduction The advances in optical technology, such as low energy loss optical passive star couplers (OPS) [8 nodes to reach the destination. This allows the usage of statically tuned transmitters and receivers

Bermond, Jean-Claude

95

Multiprocessor Architectures Using Multi-Hop Multi-OPS Lightwave Networks and Distributed Control  

E-Print Network [OSTI]

-hop lightwave network called stack-Kautz, based on the Kautz graph. We show that this architecture is very cost Introduction The advances in optical technology, such as low energy loss optical passive star couplers (OPS) [8 nodes to reach the destination. This allows the usage of statically tuned transmitters and receivers

Paris-Sud XI, Université de

96

OpLog: a library for scaling update-heavy data structures  

E-Print Network [OSTI]

Existing techniques (e.g., RCU) can achieve good multi-core scaling for read-mostly data, but for update-heavy data structures only special-purpose techniques exist. This paper presents OpLog, a general-purpose library ...

Boyd-Wickizer, Silas

2014-09-16T23:59:59.000Z

97

ACQUISITION PLANNING  

Office of Environmental Management (EM)

PLANNING Guiding Principles Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory,...

98

STRATEGIC PLAN  

Energy Savers [EERE]

STRATEGIC PLAN 2015 - 2018 Message from the Associate Under Secretary for Environment, Health, Safety and Security I am proud to introduce this strategic plan for the Office of...

99

Microsoft Word - AL-Consolidated Approps FY 2008 as of feb 21 2008 final.doc  

Broader source: Energy.gov (indexed) [DOE]

8-04 (02/21/08) 8-04 (02/21/08) 1 G Subject: Implementation of the Consolidated Appropriations Act, 2008 (Energy and Water Development and Related Agencies Appropriations Act, 2008) References: Consolidated Appropriations Act, 2008 Pub. L. 110-161, sections 301, 302, 307, 311 and 501 FAR Part 6 Competition Requirements DEAR 906.3 Other Than Full and Open Competition DEAR 917.6 Management and Operating (M&O) Contracts DEAR 970.1706-1 Award, Renewal, and Extension DOE Acquisition Guide Chapter 6.1, Competition Requirements Acquisition Letter 96-09 Extend and Compete Process of M&O

100

FY 2009 Control Table by Organization  

Broader source: Energy.gov (indexed) [DOE]

9 Control Table by Organization 9 Control Table by Organization (dollars in thousands - OMB Scoring) FY 2007 FY 2008 FY 2009 Current Current Congressional Op. Plan Approp. Request $ % Discretionary Summary By Organization National Security Weapons................................................................................. 6,258,583 6,297,466 6,618,079 +320,613 +5.1% Defense Nuclear Nonproliferation........................................... 1,824,202 1,335,996 1,247,048 -88,948 -6.7% Naval Reactors....................................................................... 781,800 774,686 828,054 +53,368 +6.9% Office of the Administrator...................................................... 358,291 402,137 404,081 +1,944 +0.5% Total, National Nuclear Security Administration.......................

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

FY 2009 Summary Table by Organization  

Broader source: Energy.gov (indexed) [DOE]

7 7 FY 2008 FY 2009 Current Current Congressional Op. Plan Approp. Request $ % Discretionary Summary By Organization National Security Weapons................................................................................. 6,258,583 6,297,466 6,618,079 +320,613 +5.1% Defense Nuclear Nonproliferation........................................... 1,824,202 1,335,996 1,247,048 -88,948 -6.7% Naval Reactors....................................................................... 781,800 774,686 828,054 +53,368 +6.9% Office of the Administrator...................................................... 358,291 402,137 404,081 +1,944 +0.5% Total, National Nuclear Security Administration....................... 9,222,876 8,810,285 9,097,262 +286,977 +3.3% Energy and Environment

102

Task Plans  

Broader source: Energy.gov (indexed) [DOE]

Task Plans Task Plans This page contains links to a tentative listing of active and closed TEC Task Plans. Final status of these task plans will be determined after the July 2000 TEC meeting. Task Plan Number/Title DOE Lead Staff Last Update Comment Status/ New No. After 7/27/00 GP-1, Section 180(c) Coordination (begun 1/96) C. Macaluso 7/98 DOE published a Revised Proposed Policy and Procedures in April 1998; no final policy will be issued until a definitive date for NWPA shipments is determined, based on site suitability or other legislative direction. To the extent that any issues related to Section 180(c) arise in TEC meetings, they are being discussed in the context of the consolidated grant topic group which is covered by another task plan. Closed

103

A DevOps framework to shorten delivery time for cloud applications  

Science Journals Connector (OSTI)

This paper proposes DevOps platforms for cloud applications, integrating both the development and operation environment seamlessly. It consists of the client-side integrated development environment (IDE), and the server-side service portfolio and cloud controller. The IDE has requirement definition, architecture design and application prototyping tools, and it can simulate execution of large-scale applications in developers' PCs. The service portfolio incorporates data from these tools and enables automatic data sharing between them, thereby avoiding setback and redundancy. To deploy the applications in the cloud, the cloud controller utilises the resource structures designed in the IDE and generates virtual machines (VMs) from templates, in which a verified OS and middleware for large-scale data processing are packaged. The behaviour of applications and VMs will be automatically monitored and catalogued as feedbacks for the developers. With these comprehensive approaches, the system integration methods can be streamlined and the acceleration of development can be easily demonstrated.

Shigeru Hosono

2012-01-01T23:59:59.000Z

104

Microsoft PowerPoint - 00_agenda_02_ops_in_fy13.pptx  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

12 Q3, August 13, 2012 12 Q3, August 13, 2012 Jim Irby: Facility status and plans Earl Marmar: Discussion of possible operations in FY13 Anne White: FY2012 Joint Research Target Steve Wukitch: Field-aligned ICRF antenna, results and plans Ron Parker: Lower Hybrid RF results and plans Geoff Olynyk: Recent disruption mitigation studies Dennis Whyte: RFQ accelerator for in-situ surface analysis, status and plans DoE Quarterly Review 08/13/2012 Facilities Outline * Status - C-Mod - ICRF Systems - LH Systems - Outer Divertor - Diagnostics * ARRA Upgrades * Plans and Schedule C-Mod Status * 13.5 weeks thus far out of 18 weeks of planned research operation * 1940 plasma discharges * Plasma operations in support of - New Field-Aligned antenna - LH current drive and wave physics - ICRF physics

105

WHITE Co-Op Office YELLOW Advisor PINK Employer GOLD Student coop: 02-2011 WEST VIRGINIA UNIVERSITY  

E-Print Network [OSTI]

WHITE ­ Co-Op Office YELLOW ­ Advisor PINK ­ Employer GOLD ­ Student coop: 02-2011 WEST VIRGINIA and Mineral Resources and the employer. 4. Consult your academic advisor to closely arrange and monitor your _____________________ Date __________ Academic Advisor _____________________ Department _____________________ Date

Mohaghegh, Shahab

106

Examen Begrippen van Kansrekening en Statistiek 2K WE, april 1998 maak iedere opgave op een apart vel papier,  

E-Print Network [OSTI]

kansverdeling? Wat is de verwachtingswaarde en de variantie? 2. Aan een tafel staan vier stoelen. Twee personen gaan op een willekeurig gekozen plaats aan tafel zitten. Wat is de kans dat ze naast elkaar zitten, a. als de tafel rond is, b. als de tafel rechthoekig is en alle stoelen zijn aan een zijde geplaatst. 3

de Groen, Pieter

107

Op%mal Scheduling of Combined Heat and Power (CHP) Plants1 under Time-sensi%ve Electricity Prices  

E-Print Network [OSTI]

1 Op%mal Scheduling of Combined Heat and Power (CHP) Plants1 under Time. Combined heat and power genera%on plants are also called co-genera%on plants. #12. #12;Facing the challenge of variability, the power grid is in transi

Grossmann, Ignacio E.

108

CORPORATE AND STRATEGIC PLANNING Faculty planning workbook  

E-Print Network [OSTI]

.............................................................................33 Staffing & workforce planningCORPORATE AND STRATEGIC PLANNING Faculty planning workbook Humanities, Law & Social Studies Outcomes from 2008/09 Confirmation of progress during 2009/10 Faculty planning for 2010/11 ­ 2012/13 #12

109

Proactive Planning  

E-Print Network [OSTI]

, rainwater harvesting, stream bank stabilization, and educational programs to prevent urban and agricultural nonpoint source pollution. Project leaders plan to have the Cedar Creek Watershed Protection Plan finalized by the summer of 2008. ?We... on watershed management, stream restoration practices, agricultural best man- agement practices, rainwater harvesting, non- point source pollution control, on-site septic system maintenance, and other water quality issues facing urban and rural...

Wythe, Kathy

2008-01-01T23:59:59.000Z

110

FTCP FY 2011 Operational Plan - Goal 2  

Broader source: Energy.gov (indexed) [DOE]

2 2 Accelerate and Expand Implementation of eTQP Champions: Allen Tate, SSO and Robert Hastings, RL Goal was not achieved due to change in software platform. The goal to automate portions of the TQP is identified in the FTCP FY2011 Ops Plan as a separate issue. Objective 1: Acceleration of eTQP Baseline Champion: Allen Tate Accomplishments The team developed an implementation schedule but the rest of the objective was not accomplished due to HC-1 decision to change the eTQP software platform to PLATEAU versus Vision. Subsequent energy of the team was spent on trying to find alternative approaches to fund and use Vision. The fiscal year ended with no solutions. Objective 2: Accelerate Implementation of eTQP Champion: Rob Hastings Accomplishments

111

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

Chapter 7.1 (May 2012 second revision) Chapter 7.1 (May 2012 second revision) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

112

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

-Chapter 7.1 (May 2012) -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

113

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

January 2011) January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

114

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

OCTOBER 2010) OCTOBER 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

115

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

PLANNING PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 6 Competition Requirements 4. FAR Part 7 Acquisition Planning 5. FAR Part 8 Required Sources of Supply 6. FAR Part 9 Contractor Qualifications 7. FAR Part 10 Market Research 8. FAR Part 11 Describing Agency Needs 9. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 10. FAR Subpart 16.1 Selecting Contract Types 11. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 12. FAR 17 Special Contracting Methods 13. FAR Part 19 Small Business Programs 14. FAR 25.802(a)(2) Other International Agreements and Coordination 15. FAR 34.004 Acquisition Strategy

116

POSITION JOB IDENTIFICATION FORM FOR NON-LINE POSITIONS (Form is required for Temporary (previously OPS) Exempt, Teaching Assistant, and Research Assistant)  

E-Print Network [OSTI]

, design, development, documentation, analysis, creation, testing, or modification of a computer systemPOSITION JOB IDENTIFICATION FORM FOR NON-LINE POSITIONS (Form is required for Temporary (previously OPS) Exempt, Teaching Assistant, and Research Assistant) EMPLOYEE NAME Position

Fernandez, Eduardo

117

The Dark Energy Survey (DES) is a next genera6on op6cal survey aimed at understanding the expansion rate of the universe using four complementary  

E-Print Network [OSTI]

The Dark Energy Survey (DES) is a next genera6on op6cal survey aimed of the project will be described. ! Dark Energy Survey Camera! http is building the Dark Energy Camera (DECam), a 3 square degree, 520 Megapixel

Wechsler, Risa H.

118

Tax-Advantaged Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plans Tax-Advantaged Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact...

119

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

7.1 (May 2010) 7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination 13. FAR 34.004 Acquisition Strategy Guiding Principles

120

ACQUISITION PLANNING  

Broader source: Energy.gov (indexed) [DOE]

--Chapter 7.1 (JUNE 2010) --Chapter 7.1 (JUNE 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Maps and Plans  

E-Print Network [OSTI]

shrouded door to box seats. Rose / Maps and Plans Re-Placing Places 20.1 Rose / Maps and Plans Re-Placing PlacesMaps and Plans Thomas Rose Architectural plans create the

Rose, Thomas

2008-01-01T23:59:59.000Z

122

Annual Training Plan Template  

Broader source: Energy.gov [DOE]

The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

123

PROJECT MANAGEMENT PLANS Project Management Plans  

Broader source: Energy.gov (indexed) [DOE]

MANAGEMENT PLANS MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Section 4.2 of DOE Guide 430.1-3, DEACTIVATION IMPLEMENTATION GUIDE discusses the content and purpose of deactivation project management plans. It is presented as a suggested outline followed by other potential subjects. For the convenience of readers, that information is repeated below.

124

LANS DB PENSION PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

December 2010 December 2010 u:\my documents\pension plan\revised tcp1 db plan spd dec 2010.doc LANS Defined Benefit Pension Plan Summary Plan Description This Summary Plan Description (SPD) is intended to provide a summary of the principal features of the LANS Defined Benefit Pension Plan ("Plan") and is not meant to interpret, extend or change the Plan in any way. This SPD will continue to be updated. Please check back on a regular basis for the most recent version. Nothing in the Plan and/or this SPD shall be construed as giving any member the right to be retained in service with LANS or any affiliated company, or as a guarantee of any rights or benefits under the Plan. LANS, in its sole discretion, reserves the right to amend the SPD or Plan, or to terminate the Plan, at any time.

125

Knowledge Preconditions for Plans  

Science Journals Connector (OSTI)

......research-article Original Articles Knowledge Preconditions for Plans ERNEST DAVIS...of time and a possible worlds model of knowledge. The definitions strictly subsume previous...semantics of plans|formal theory of knowledge.| Knowledge Preconditions for Plans......

ERNEST DAVIS

1994-10-01T23:59:59.000Z

126

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007. Blevins #12; i ACKNOWLEDGEMENTS The 2007 Strategic Transmission Investment Plan was prepared Investment Plan. California Energy Commission, Engineering Office. CEC7002007018CTF. #12; ii #12; iii

127

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2007 Investment Plan was prepared with contribution from the following Energy Commission staff and consultants Kondoleon, Chuck Najarian. 2007 Strategic Transmission Investment Plan. California Energy Commission

128

Venus Technology Plan Venus Technology Plan  

E-Print Network [OSTI]

Venus Technology Plan May 2014 #12; ii Venus Technology Plan At the Venus Exploration a Roadmap for Venus Exploration (RVE) that is consistent with VEXAG priorities as well as Planetary Decadal Survey priorities, and (3) develop a Technology Plan for future Venus missions (after a Technology

Rathbun, Julie A.

129

4865 recreation planning [n  

Science Journals Connector (OSTI)

landsc. plan. pol. recr....(Development of policies, strategies and measures for the provision of recreation areas and facilities; ? urban area recreation planning ...

2010-01-01T23:59:59.000Z

130

Marketing Planning: Feeniks Koulu.  

E-Print Network [OSTI]

??Degree Thesis Marketing Planning: Feeniks Koulu demonstrates structured marketing planning process with the help of case company Feeniks Koulu. The central idea of Thesis is (more)

Raut, Biranjan

2013-01-01T23:59:59.000Z

131

Microsoft Word - FTCP FY 2012 Ops Plan Goal 2 input for face to face meeting in Sept 2012 Rev 3.docx  

Broader source: Energy.gov (indexed) [DOE]

18, 2012 18, 2012 Goal 2 Enhance Training Champion: TJ Jackson, EM Consolidated Business Center Objective 1: Human Factors Engineering Training Development Champion: Carol Ingram Accomplishments/Status 1) Design training to support the approved HFE competencies, by March 31, 2012. DONE - Completed analysis for three target audiences: o HQ Program Managers, o HQ Oversight personnel (e.g., ES&H or NS Managers), and o Site Office personnel (e.g., FRs, SSOs, NSSs, FMMs, etc.) - Compile training materials (ongoing) - Refine learning objectives (done for each of three audiences; attached) 2) Develop and implement training, by September 30, 2012. INCOMPLETE / TO BE POSTPONED - Determine and implement appropriate training methods based on JTA results: Done.

132

IMPROVING THE USER EXPERIENCE OF THE LAWRENCE TRANSIT SYSTEM: A FOCUS ON MAP USABILITY AND ROUTE PLANNING  

E-Print Network [OSTI]

Lawrence Memorial Hospital East Lawrence Recreation Center East Hills Business Park Douglas County Fairgrounds KU Park & Ride (open to public) OP 1 OP 2 OP 3 OP 4 OP 5 OP 6 OP 7 OP 5 OP 6 OP 8 ??? 70 OP 10 OP 32 OP 10 ?? 24/40 ?? 40/59 ?? 24/59 ??? 70... to the Lawrence Memorial Hospital. HINU 1 2 74 92 E.Berkman HINU Routes Routes 1, 2, 4, 7 1 2 4 Libr ar y Hospital F r ee S ta t e H.S. D ow n t ow n W al-M ar t - S outh Checkers HINU6th / W ak arusa East H ills Business P ar k D ow n t ow n P ost O f_f_ic e...

Berkman, Eric

2009-07-21T23:59:59.000Z

133

Motion Planning ! Jana Kosecka!  

E-Print Network [OSTI]

1! Motion Planning ! Jana Kosecka! Department of Computer Science! ·Discrete planning, graph search://cs.cmu.edu/~motionplanning, Jyh-Ming Lien! Discrete Planning! · Review of some discrete planning methods! · Given state space is discrete) ! · Use well developed search and graph traversal algorithms to find the path! · Path: set

Kosecka, Jana

134

Climate change action plan  

E-Print Network [OSTI]

Delivery Climate change action plan 2009-2011 #12;2 | Climate change action plan ©istockphoto.com #12;Climate Change Action Plan Climate change action plan | 3 Contents Overview 4 Preface and Introduction 5 Climate change predictions for Scotland 6 The role of forestry 7 Protecting and managing

135

Intermountain Province Subbasin Plan  

E-Print Network [OSTI]

, and stakeholders. The IMP subbasin plan includes: · an assessment providing the technical foundation for the plan Power and Conservation Council Portland, Oregon O N B E H A L F O F : Intermountain Province Oversight Planning in the Intermountain Province The Northwest Power Planning Council1 's (Council) 2000 Fish

136

Plan - Data Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Plan Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Plans NASA's Terrestrial Ecology Program now requires that each proposal include a Data Management Plan (DMP) of up to two pages. A DMP for a proposal is a brief document that outlines what you will do with your data during and after your research, to ensure your data will be safe, documented, and accessible now and in the future. A DMP - developed early and used throughout the research project - will increase research efficiency by making the data understandable and usable in the future and

137

Guidance for Planning Exercises  

Broader source: Energy.gov (indexed) [DOE]

for Planning, Conducting and Evaluating for Planning, Conducting and Evaluating Transportation Emergency Preparedness Tabletops, Drills and Exercises Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-10.p65 This page intentionally left blank table of contents Transportation Emergency Preparedness Program (TEPP) planning tools planning tools Guidance f Guidance f Guidance f Guidance f Guidance for Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Evaluating aluating aluating aluating aluating T T T T Tr r r r ransportation Emer ansportation Emer ansportation Emer ansportation Emer ansportation Emergenc genc genc genc gency Pr y Pr y Pr y Pr y Prepar epar epar epar eparedness T

138

Microsoft Word - prjct planning  

Broader source: Energy.gov (indexed) [DOE]

Planning Checklist Planning Checklist The following checklist is intended to provide system owners, project managers, and other information system development and maintenance professionals with guidance in identifying and preparing project planning activities. The checklist reflects recognized project planning activities to be performed throughout the information systems project life cycle. Project planning is generally characterized as a process for selecting the strategies, policies, programs, and procedures for achieving the objectives and goals of the project. The objectives of project planning for information systems projects are summarized as the following: C User's environment is analyzed. C Project objectives and scope are defined. C High-level functional requirements are estimated.

139

Tribal Strategic Energy Plan and Planning Handbook  

Broader source: Energy.gov [DOE]

The Tribal Strategic Energy Plan and Planning Handbook, published by the DOE Office of Indian Energy, is a tool for Tribes to use to help achieve energy goals in both the near- and long-term. This Handbook intends to help tribal leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building.

140

Marketing Plan for Transmission Planning Services  

E-Print Network [OSTI]

not specifically related to transmission planning and not to outside companies who may require the help in transmission planning. It is essential that we take the market opportunity that currently exists to expand our services to our existing and new clients...

Tu, Linh

2006-12-15T23:59:59.000Z

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

A shift-share analysis of industrial composition and growth in the Lower Rio Grande Valley State Planning Region of Texas  

E-Print Network [OSTI]

of Employment Early Short-run, 1967-1970 (Appendix B, Table 34) 66 69 69 69 70 71 74 74 75 75 77 77 80 81 81 83 85 90 90 91 92 93 93 97 97 97 98 100 105 105 106 107 108 108 110 110 110 TABLE OP CONTENTS (Continued) Pa. ge... Planning Region 4. Change in median family incomes in the Lower Rio Grande Valley State Planning Region, 1959-1969 5. Employment distribution and change, by Standard Indus- trial Classification divisions, for the United States, 1967-1974 50 6. Wage...

Shapiro, Barry Ira

2012-06-07T23:59:59.000Z

142

Training Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for systemsoftware development and...

143

Green Development Plan  

Science Journals Connector (OSTI)

The Ninth Five-Year Plan introduced two changes: the economic system will change from a traditional planned economy to a socialist market economy; and the economic growth mode will change from extensive to int...

Angang Hu

2014-01-01T23:59:59.000Z

144

Motion Planning Jana Kosecka  

E-Print Network [OSTI]

Slides thanks to http://cs.cmu.edu/~motionplanning, Jyh-Ming Lien Hard Motion Planning · Configuration Geometric Models S Sampling Based Motion Planner Discrete Search C-space planning Idea : Generate random

Kosecka, Jana

145

RM Capital Investment Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Capital Investment Plans FY 2004 (568kb pdf) FY 2005 (625kb pdf) FY 2006 (625kb pdf) FY 2007 (1.45mb pdf) Meter policy Capital Investment Plans...

146

Decommissioning Plan RM  

Broader source: Energy.gov [DOE]

The Decommissioning Plan Review (DPR) Module is a tool that assists DOE federal project review teams in evaluating the adequacy of the decommissioning plan prior to approval of the associated CD.

147

Sustainabiliity Sustainability Plan  

E-Print Network [OSTI]

Sustainabiliity IIT Campus Sustainability Plan 2010­2020 Published Fall Semester 2010 www.iit.edu/campus_sustainability #12;IIT Campus Sustainability Plan 2010-2020 Fall Semester 2010 1 Section I: Background Sustainability ...................................................................................................................................................................8 IIT Academic Entities on Sustainability

Heller, Barbara

148

Virginia Energy Plan (Virginia)  

Broader source: Energy.gov [DOE]

The 2010 Virginia Energy Plan affirms the state's support for the development of renewable energy. The Plan assesses the states energy picture through an examination of the states primary energy...

149

2030 OCARTS Plan Report  

E-Print Network [OSTI]

2030 OCARTS PLAN REPORT Oklahoma City Area Regional Transportation Study Adopted by the Intermodal Transportation Policy Committee and Endorsed by the Board of Directors of the Association... entitled Planning for 2030: Oklahoma City Area Regional Transportation Study and the Technical Supplement to the Plan Report are companion pieces to this document. The Plan brochure was developed to provide an overview of both the development process...

Association of Central Oklahoma Governments

150

NHMFL Emergency Action Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NATIONAL HIGH MAGNETIC FIELD LABORATORY NHMFL FLORIDA STATE UNIVERSITY SAFETY PROCEDURE SP-3 TITLE: EMERGENCY ACTION PLAN ...

151

Motion Planning Jana Kosecka  

E-Print Network [OSTI]

1 Motion Planning Jana Kosecka Department of Computer Science · Discrete planning, graph search://cs.cmu.edu/~motionplanning, Jyh-Ming Lien State space · Set of all possible states is represented as graph · Nodes states, links planning ­ generate a set of actions, if the solution exists it must be found in the finite time · Search

Kosecka, Jana

152

Bicycle Master Plan Acknowledgments  

E-Print Network [OSTI]

Bicycle Master Plan #12;Acknowledgments Many people contributed to the development of the APU Bicycle Master Plan by providing valuable input, comments and review of the document. Different departments of APU will have to work together to implement the plan and to further encourage bicycling

Scheel, David

153

January 2011 Strategic Planning Session  

E-Print Network [OSTI]

Maintenance work requests .1.2 All FM Units Achieve Customer Satisfaction of 85% 85% 85.0% Annual 4.1.3 Reduce: Maintenance & Ops.1.5 Maint Cost/GSF +/ 5% of APPA Avg for Peer Inst +/5% 6.1.6 Landscape Cost/GSF +/5% of APPA Avg for Peer

Howitt, Ivan

154

January 2013 Strategic Planning Session  

E-Print Network [OSTI]

Process 1.3.1 Reactive Maintenance work requests rating 85% 4.1.2 All FM Units Achieve Customer Satisfaction of 85% 85% 4.1.3 Reduce: Maintenance & Ops% of APPA Avg for Peer Inst "+/-5%" 6.1.6 Landscape Cost/GSF +/-5% of APPA Avg for Peer Inst "+/-5%" 6

Howitt, Ivan

155

April 2010 Strategic Planning Session  

E-Print Network [OSTI]

satisfaction 4.1.3 Reduce: Maintenance & Ops # hot/cold calls 15% or /GSF +/ 5% of APPA Avg for Peer Inst +/5% ? Annual Annual 6.1.6 Landscape Cost/GSF +/5% of APPA Avg for Peer Request Process 1.3.1 Reactive Maintenance work requests

Howitt, Ivan

156

October 2012 Strategic Planning Session  

E-Print Network [OSTI]

Process 1.3.1 Reactive Maintenance work requests : Maintenance & Ops # hot/cold calls -10% or Inst "+/-5%" 6.1.5 Maint Cost/GSF +/- 5% of APPA Avg for Peer Inst "+/-5%" 6.1.6 Landscape Cost

Howitt, Ivan

157

Draft 2014 Annual Plan | Department of Energy  

Office of Environmental Management (EM)

Draft 2014 Annual Plan Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan Section 999 - Draft 2014 Annual Plan More Documents & Publications 2011 Annual Plan 2013...

158

Long Range Campus Development Plan Implementation and Plan Phasing  

E-Print Network [OSTI]

Long Range Campus Development Plan Implementation and Plan Phasing 55 Introduction Plan Review approach and the formal, regular review of the process of the Plan. MSU will revisit the Plan on a cyclical will continue to build upon and refine these fundamental elements and strategies. Recurring review of the Plan

Maxwell, Bruce D.

159

Report: EM Strategic Planning  

Broader source: Energy.gov (indexed) [DOE]

STRATEGIC PLANNING STRATEGIC PLANNING September 25, 2008 Submitted by the EMAB Strategic Planning Subcommittee Background In Fiscal Year (FY) 2008, the Environmental Management Advisory Board (EMAB) was tasked to assess EM's strategic planning capabilities/processes and, in particular, to review the status of the initiatives pursued by the Office of Strategic Planning and Analysis (EM-32). This charge was derived from the Board's work pertaining to the topics of Discretionary Budgeting and Technical Uncertainty and Risk Reduction, which were addressed in previous reports and recommendations to the Assistant Secretary. The EMAB Strategic Planning Committee was formed to expand on this earlier work and pursue dialogues with the EM Office of Program Planning and Budget (EM-30) in

160

Operating plan FY 1998  

SciTech Connect (OSTI)

This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

NONE

1997-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Alaska Strategic Energy Plan and Planning Handbook  

Broader source: Energy.gov (indexed) [DOE]

Alaska Strategic Energy Alaska Strategic Energy Plan and Planning Handbook A. Dane and L. Doris National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence Ave. SW, Washington DC 20585 | 202-586-1272 energy.gov/indianenergy | indianenergy@hq.doe.gov Alaska Strategic Energy Plan and Planning Handbook ii NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned

162

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network [OSTI]

Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 Human Resources #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

Oliver, Douglas L.

163

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network [OSTI]

Department 2588 Hospital Risk Manager 2687 Hospital Quality Assurance 3153 Hospital Clinical Engineering 2954 #12;5. CHEMICAL HYGIENE PLAN 5.1 General Standard Operating Procedures 5.1.1 General Rules 5

Kim, Duck O.

164

Integrated Planning and Performance Management  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

management systems need clarification - Consolidated planning annual timetable needed for efficiency * Organizational rolesresponsibilities need alignment to defined planning...

165

Minutes Ops mtg 090211  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

September 2, 2011 September 2, 2011 11:00 - 11:45 AM Minutes Attendees: Gang Huang, Tom McVeigh, Gregg Penn, Abdi Salehi, Tom Scarvie, Peter Seidl, Pat Thomas, Herb Toor, Csaba Toth, Weyland Wong 1. ES&H News and Lessons Learned: News: LBNL will be vacated the existing off-site warehouse and contracting with a warehouse management company that has several regional warehouses to manage our storage. Programs will be charged for storage. Program Heads will be asking PIs to review the materials they have in storage and reduce the quantity. There will be a temptation to move equipment from the warehouse to AFRD space on site. With Bldg. 52 being demolished and the 58A and 71 high bays being filled with new experiments, we don't have much storage space left. Program Safety

166

Minutes Ops mtg 080511  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

August 5, 2011 August 5, 2011 10:30 - 11:30 AM Minutes Attendees: Tom McVeigh, Gregg Penn, Abdi Salehi, Pat Thomas, Herb Toor, Csaba Toth, Weyland Wong 1. ES&H News and Lessons Learned: * Accident Statistics - A review of LBNL accident statistics for June 2011 reveals several slip/trip/fall accidents, including: i. An administrator fell while walking across a parking lot, ii. A project manager tripped while walking up a wooden stairs, iii. A custodian sprained an ankle while stepping on the edge of a manhole cover, iv. A guest tripped over a fire hose that was stretched across a driveway. v. A research associate was startled by a hawk and fell off a sidewalk, vi. A writer/editor lost footing on a tapered curb near a bus stop, vii. A laborer lost footing on slippery concrete while cleaning a catch

167

Minutes Ops mtg 120803  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3, 2012 3, 2012 10:30 - 11:30 AM Minutes Attendees: Ned Borglin, Marshall Granados, Gregg Penn, Abdi Salehi, Peter Seidl, Pat Thomas, Herb Toor, Csaba Toth, Weyland Wong 1. ES&H News and Lessons Learned: News: * EHSS Customer Service Focus Group - Joe Dionne is organizing a focus group to discuss ways the Environmental Health, Safety, and Security Division can improve customer service. Participation will require a commitment of 1-2 hours. Please contact Peter Seidl or Pat Thomas if you are interested in participating. * Security and Emergency Services news - The annual drop/cover/hold/ evacuate earthquake drill is scheduled at 10 AM on October 18. A new version of the red-and-white Emergency Response Guide wall posters is being printed and should be available soon. The new Security and

168

Minutes Ops mtg 070111  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1, 2011 1, 2011 10:30 - 11:30 AM Minutes Attendees: Ken Barat, Tom McVeigh, Abdi Salehi, Pat Thomas, Herb Toor, Weyland Wong 1. ES&H News and Lessons Learned: * Yale shop fatality - In April, an astronomy and physics graduate student working alone late at night inside a machine shop was killed when her hair become caught in a lathe. The shop had a staff member present during daytime hours, but not at night. Students were allowed to use the shop after completing an introductory shop course. Yale is reviewing safety policies for facilities with power equipment. * Reciprocating saw injury - On March 3, an Idaho National Laboratory employee was injured while preparing to cut a brace with a reciprocating saw (Saws-All). The employee was wearing PPE (gloves and safety

169

Minutes Ops mtg 100711  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

October 7, 2011 October 7, 2011 10:30 - 11:30 AM Minutes Attendees: Gregg Penn, Tom McVeigh, Abdi Salehi, Tom Scarvie, Pat Thomas, Herb Toor, Csaba Toth 1. ES&H News and Lessons Learned: News: * Israel Tadesse is the new hazardous waste generator assistant for AFRD. Israel previously worked in the EHS radiation safety group. Maram Kassis remains as the supervisor of the generator assistants. * Mark Scott is the new electrical safety subject matter expert for Berkeley Lab. Keith Gershon has retired. * Ken Barat will be away from the Lab October 6-14 and Oct. 28-Nov. 4. Shawn Roe is his backup for laser safety. * There was a Town Hall meeting on October 7 regarding the proposed "Working Alone" policy. The final policy will appear in PUB-3000

170

Minutes Ops mtg 120601  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

, 2012 , 2012 10:30 - 11:30 AM Minutes Attendees: Ned Borglin, Marshall Granados, Prabir Roy, Abdi Salehi, Tom Scarvie, Thomas Schenkel, Peter Seidl, Pat Thomas, Herb Toor, Csaba Toth, Linnea Wahl, Marty White, Mike Wisherop, Weyland Wong 1. ES&H News and Lessons Learned: News: * New EHS Liaison - Linnea Wahl is the new EHS Liaison for General Sciences, including AFRD. Ned Borglin is Linnea's back-up when she is not available. Ken Barat will continue as the Laser Safety Officer until he retires. * Pat's Vacation - Pat Thomas will be on vacation June 8-24 and does not expect to be in email contact. If you have some urgent safety issues that cannot wait until June 25, please contact Pat now to get them started. Back-up people you can contact while Pat is away are:

171

CAN PLAN OR NO CAN PLAN? REVIEW OF NATURAL RESOURCE MANAGEMENT PLANNING IN HAWAI`I  

E-Print Network [OSTI]

CAN PLAN OR NO CAN PLAN? REVIEW OF NATURAL RESOURCE MANAGEMENT PLANNING IN HAWAI`I DAVID DUFFY,* S with planning experts and reviewed current literature to derive 15 criteria that in our opinion were important that reviewed plans only partially fulfilled most criteria. Only five reviewed plans came within 10% of total

Duffy, David Cameron

172

Decommissioning Plan RM  

Broader source: Energy.gov (indexed) [DOE]

Decommissioning Plan Review Module Decommissioning Plan Review Module March 2010 CD-0 O 0 C OFFICE OF D C CD-1 F ENVIRO Standard R Decomm Rev Critical Decisi CD-2 M ONMENTAL Review Plan missioning view Module ion (CD) Ap CD March 2010 L MANAGE n (SRP) g Plan e plicability D-3 EMENT CD-4 Post Oper ration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

173

Project Execution Plan RM  

Broader source: Energy.gov (indexed) [DOE]

Project Execution Plan (PEP) Review Module Project Execution Plan (PEP) Review Module March 2010 CD-0 O 0 OFFICE OF P C CD-1 F ENVIRO Standard R Project E Rev Critical Decis CD-2 M ONMENTAL Review Plan Execution view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) n Plan e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

174

IDC Integrated Master Plan.  

SciTech Connect (OSTI)

This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

Clifford, David J.; Harris, James M.

2014-12-01T23:59:59.000Z

175

JGI - Sequencing Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sequencing Plans Sequencing Plans JGI engages users from the National Laboratory system, academic institutions, and private industry to perform sequencing projects that directly relate to the DOE Office of Biological and Environmental Research's missions in alternative energy, global carbon cycling, and bioremediation. JGI's sequencing portfolio is drawn from its user programs, including the Community Science Program and the new Bioenergy Research Centers, as well as targets chosen by DOE to meet programmatic objectives. Plans by Program and Year All projects GEBA Sequencing Plans Community Science Program FY2014 Community Sequencing Program FY2013 Community Sequencing Program FY2012 Community Sequencing Program FY2011 Community Sequencing Program FY2010 Community Sequencing Program FY2009

176

Advance Care Planning Safeguards  

Science Journals Connector (OSTI)

Regardless of which goals of advance care planning are featured, safeguards, as reviewed in my article and by...5 we inadvertently may be doing harm.

J. Andrew Billings MD

2012-11-01T23:59:59.000Z

177

Environmental Management System Plan  

E-Print Network [OSTI]

R-3 Environmental Management System Plan References 30.of Energy, Safety Management System Policy, DOE P 450.4 (E), Environmental Management Systems ? Requirements with

Fox, Robert

2009-01-01T23:59:59.000Z

178

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

Brekke, D.D.

1995-11-01T23:59:59.000Z

179

WATER CONSERVATION PLAN  

National Nuclear Security Administration (NNSA)

i WATER CONSERVATION PLAN TONOPAH TEST RANGE UNITED STATES DEPARTMENT OF ENERGY January 10, 2011 Prepared for: Tonopah Test Range Post Office Box 871 Tonopah, Nevada 89049 (702)...

180

Strategic Plan: 2014 - 2018  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

marketplace to an expanding customer base. EIA's program directly supports Goal 1 (Science and Energy) of DOE's 2014 Strategic Plan. Specifically, EIA has identified four...

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 6 Actions to Implement Investments

182

STRATEGIC TRANSMISSION INVESTMENT PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION STRATEGIC TRANSMISSION INVESTMENT PLAN Prepared in Support of the 2005............................................................................................ 5 Project Investment Recommendations ............................................................... 5 Actions to Implement Investments

183

Navajo Marketing Plan Process  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Navajo Surplus Marketing Reference Material Amended Navajo Marketing Plan AZ Water Settlements Act Colorado River Basin Project Act General Power Contract Provisions (GCPC) - 09...

184

BROMEX Logistics Meeting plan  

E-Print Network [OSTI]

BROMEX Logistics Meeting plan Fairbanks, Alaska 22-23 Feb 2011 #12;22 Feb 2011 ­ Photo taken by Son

Rigor, Ignatius G.

185

PROJECT MANAGEMENT PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7, 2011 Verification Method: Functional model module operating in decision support system Title: Water institutions tool: Phase I Planned Date: April 1, 2011 Verification...

186

BPA Energy Efficiency Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

BPA Energy Efficiency Plan Pages default Sign In About | Careers | Contact | Investors | bpa.gov Search Policy & Reporting Expand Policy & Reporting EE Sectors Expand EE...

187

MITG Test Plan  

SciTech Connect (OSTI)

The plan presented is for the testing of a prototypical slice of the Modular Isotopic Thermoelectric Generator (MITG). Cross Reference T48-1.

Eck, Marshall B.

1981-08-01T23:59:59.000Z

188

State Energy Strategic Planning  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

189

planning for emergencies  

National Nuclear Security Administration (NNSA)

1%2A en Planning for Emergencies http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorismplanningforemergencies

190

Strategic Energy Planning Process  

Broader source: Energy.gov [DOE]

The nine-step process for community strategic energy planning helps Tribes establish a comprehensive understanding of current energy use and costs, get insight into efficiency and conservation...

191

Health Education Lesson Plans Health Education Lesson Plans  

E-Print Network [OSTI]

Health Education Lesson Plans Health Education Lesson Plans (Healthy Kids Resource Center; no lesson plans to download, but library of health curriculum http://www.hkresources.org/ Dairy Council://www.epa.gov/teachers For Lesson Plans http://www.forlessonplans.com Health Lessons Plans Web Quest http://www.edhelper.com/cat55

de Lijser, Peter

192

Environmental Protection Implementation Plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. The Environmental Protection Implementation Plan serves as an aid to management and staff to implement new environmental programs in a timely manner.

Brekke, D.D.

1994-01-01T23:59:59.000Z

193

Hanford facility contingency plan  

SciTech Connect (OSTI)

The Hanford Facility Contingency Plan, together with each TSD unit- specific contingency plan, meets the WAC 173-303 requirements for a contingency plan. Applicability of this plan to Hanford Facility activities is described in the Hanford Facility RCRA Permit, Dangerous Waste Portion, General Condition II.A. General Condition II.A applies to Part III TSD units, Part V TSD units, and to releases of hazardous substances which threaten human health or the environment. Additional information about the applicability of this document may also be found in the Hanford Facility RCRA Permit Handbook (DOE/RL-96-10). This plan includes descriptions of responses to a nonradiological hazardous substance spill or release at Hanford Facility locations not covered by TSD unit-specific contingency plans or building emergency plans. The term hazardous substances is defined in WAC 173-303-040 as: ``any liquid, solid, gas, or sludge, including any material, substance, product, commodity, or waste, regardless of quantity, that exhibits any of the physical, chemical or biological properties described in WAC 173-303-090 or 173-303-100.`` Whenever the term hazardous substances is used in this document, it will be used in the context of this definition. This plan includes descriptions of responses for spills or releases of hazardous substances occurring at areas between TSD units that may, or may not, threaten human health or the environment.

Sutton, L.N.

1996-07-01T23:59:59.000Z

194

Environmental protection Implementation Plan  

SciTech Connect (OSTI)

This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

R. C. Holland

1999-12-01T23:59:59.000Z

195

Walkability Planning in Jakarta  

E-Print Network [OSTI]

Integrated accessibility strategy and design Legibility Integrated activity Shared spaces Strategy 1: Policy Pedestrian planning as constituency buildingIntegrated activity study Inclusive road designation WikiPlaces pedestrian network mapping Vernacular placemaking and Asian shared street design Pedestrian planning as constituency building

Lo, Ria S. Hutabarat

2011-01-01T23:59:59.000Z

196

ENERGY EMERGENCY RESPONSE PLAN  

E-Print Network [OSTI]

CALIFORNIA ENERGY COMMISSION ENERGY EMERGENCY RESPONSE PLAN COMMISSIONREPORT October 2006 CEC-600-2006-014 Arnold Schwarzenegger, Governor #12;CALIFORNIA ENERGY COMMISSION Jackalyne Pfannenstiel Chairman James D Deputy Director FUELS AND TRANSPORTATION DIVISION #12;The Energy Emergency Response Plan is prepared

197

Corporate Plan Corporate Plan 2008-2011  

E-Print Network [OSTI]

Planned Income and Expenditure 26 Performance Measures Table 3 - Key Agency Targets 27 #12;3 | Corporate the difference between income raised and expenditure incurred. We operate in accordance with full resource levied on the capital value tied up in the national forest estate. The 2007 Spending Review allocated

198

PROJECT PLANNING TEMPLATE  

Broader source: Energy.gov (indexed) [DOE]

Plan i Issue Date: 4/24/2009 Plan i Issue Date: 4/24/2009 U.S. Department of Energy Office of Engineering and Construction Management Project Plan for the Project Assessment and Reporting System (PARS II) Version 2.0a (Public) April 20, 2009 Submitted by: Energy Enterprises Solutions 20440 Century Blvd. Suite 150 Germantown, MD 20874 Phone 301-916-0050 Fax 301-916-0066 www.eesllc.net PARS II Project Plan ii Issue Date: 4/24/2009 Title Page Document Name: Project Plan for the Project Assessment and Reporting System (PARS II), V2.0a Publication Date: April 24, 2009 Contract Number: DE-AT01-06IM00102 Project Number: 1ME07, CLIN 2 Prepared by: Judith Bernsen, PMC, LLC Kai Mong, Energy Enterprise Solutions, LLC

199

Commissioning Plan RM  

Broader source: Energy.gov (indexed) [DOE]

Checkout, Testing, and Checkout, Testing, and Commissioning Plan Review Module March 2010 CD-0 O Ch 0 OFFICE OF heckout, T C CD-1 F ENVIRON Standard R Testing, a Revi Critical Decis CD-2 Ma NMENTAL Review Plan and Com iew Module sion (CD) Ap CD arch 2010 L MANAGE n (SRP) mmissioni e pplicability D-3 EMENT ing Plan CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

200

Operational Area Monitoring Plan  

Office of Legacy Management (LM)

' ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan for the DOE Field Office, Nevada (DOEINV) nuclear and non- nuclear testing activities associated with the Nevada Test Site (NTS). These Operational Area Monitoring Plans are prepared by various DOE support contractors, NTS user organizations, and federal or state agencies supporting DOE NTS operations. These plans and the parent

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

South Texas Planning Region Public Transportation Coordination Plan  

E-Print Network [OSTI]

KFH GROUP, INC. SOUTH TEXAS PLANNING REGION PUBLIC TRANSPORTATION COORDINATION PLAN Developed for the: SOUTH TEXAS DEVELOPMENT COUNCIL ECONOMIC DEVELOPMENT PROGRAM By: KFH Group, Incorporated December.................................................................................................................................1 PLAN PROCESS .............................................................................................................................3 GOALS AND OBJECTIVES...

South Texas Development Council Economic Development Program

2006-12-15T23:59:59.000Z

202

Domain area planning utility (DAPU) for planning wireless battlefield networks  

Science Journals Connector (OSTI)

We describe the key design concepts of Domain Area Planning Utility (DAPU) developed by the PILSNER program to perform high-speed automated planning of Future Battlefield Networks (FBNs). DAPU processes multiple inputs from Resource Planning such as ...

Mariusz A. Fecko; John Unger; Sunil Samtani; Douglas Davey; Andrzej Cichocki; Bill Biagini; Paul Rego; Rick Stewart; Aristides Staikos

2009-10-01T23:59:59.000Z

203

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan  

E-Print Network [OSTI]

DRAFT Fifteenmile Management Plan 5. Fifteenmile Subbasin Management Plan DRAFT May 25 2004 Compiled by Wasco County Soil and Water Conservation District in cooperation with Fifteenmile Coordinating Group 5. FIFTEENMILE SUBBASIN MANAGEMENT PLAN

204

Energy Efficiency Market Sustainable Business Planning | Department...  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Market Sustainable Business Planning Energy Efficiency Market Sustainable Business Planning Energy Efficiency Market Sustainable Business Planning, a presentation...

205

2012 DOE Strategic Sustainability Performance Plan | Department...  

Broader source: Energy.gov (indexed) [DOE]

DOE Strategic Sustainability Performance Plan 2012 DOE Strategic Sustainability Performance Plan The 2012 DOE Strategic Sustainability Performance Plan embodies DOE's...

206

Yakima Habitat Improvement Project Master Plan, Technical Report 2003.  

SciTech Connect (OSTI)

The Yakima Urban Growth Area (UGA) is a developing and growing urban area in south-central Washington. Despite increased development, the Yakima River and its tributaries within the UGA continue to support threatened populations of summer steelhead and bull trout as well as a variety of non-listed salmonid species. In order to provide for the maintenance and recovery of these species, while successfully planning for the continued growth and development within the UGA, the City of Yakima has undertaken the Yakima Habitat Improvement Project. The overall goal of the project is to maintain, preserve, and restore functioning fish and wildlife habitat within and immediately surrounding the Yakima UGA over the long term. Acquisition and protection of the fish and wildlife habitat associated with key properties in the UGA will prevent future subdivision along riparian corridors, reduce further degradation or removal of riparian habitat, and maintain or enhance the long term condition of aquatic habitat. By placing these properties in long-term protection, the threat of development from continued growth in the urban area will be removed. To most effectively implement the multi-year habitat acquisition and protection effort, the City has developed this Master Plan. The Master Plan provides the structure and guidance for future habitat acquisition and restoration activities to be performed within the Yakima Urban Area. The development of this Master Plan also supports several Reasonable and Prudent Alternatives (RPAs) of the NOAA Fisheries 2000 Biological Opinion (BiOp), as well as the Water Investment Action Agenda for the Yakima Basin, local planning efforts, and the Columbia Basin Fish and Wildlife Authority's 2000 Fish and Wildlife Program. This Master Plan also provides the framework for coordination of the Yakima Habitat Improvement Project with other fish and wildlife habitat acquisition and protection activities currently being implemented in the area. As a result of the planning effort leading to this Master Plan, a Technical Working Group (TWG) was established that represents most, if not all, fish and wildlife agencies/interests in the subbasin. This TWG met regularly throughout the planning process to provide input and review and was instrumental in the development of this plan. Preparation of this plan included the development of a quantitative prioritization process to rank 40,000 parcels within the Urban Growth Area based on the value of fish and wildlife habitat each parcel provided. Biological and physical criteria were developed and applied to all parcels through a GIS-based prioritization model. In the second-phase of the prioritization process, the TWG provided local expert knowledge and review of the properties. In selecting the most critical areas within the Urban Growth Area for protection, this project assessed the value of fish and wildlife habitat on the Yakima River. Well-developed habitat acquisition efforts (e.g., Yakima River Basin Water Enhancement Project by the Bureau of Reclamation and Yakama Nation acquisition projects) are already underway on the Yakima River mainstem. These efforts, however, face several limitations in protection of floodplain function that could be addressed through the support of the Yakima Habitat Improvement Project. This Master Plan integrates tributary habitat acquisition efforts with those ongoing on the Yakima River to best benefit fish and wildlife in the Urban Growth Area. The parcel ranking process identified 25 properties with the highest fish and wildlife value for habitat acquisition in the Yakima Urban Area. These parcels contain important fish and wildlife corridors on Ahtanum and Wide Hollow Creeks and the Naches River. The fifteen highest-ranking parcels of the 25 parcels identified were considered very high priority for protection of fish and wildlife habitat. These 15 parcels were subsequently grouped into four priority acquisition areas. This Master Plan outlines a four-year schedule for acquisition, protection, and restoration of the 25 highest ranked prop

Golder Associates, Inc.

2003-04-22T23:59:59.000Z

207

Waste Management Quality Assurance Plan  

E-Print Network [OSTI]

PUB-5352, Rev. 6 WM QA Plan Review and approval of changesand review of procedures, work plans, instructions, reports,Plans, Instructions and Reports9 4.1.2 Procedure Review and

Waste Management Group

2006-01-01T23:59:59.000Z

208

Renewables Portfolio Standard Procurement Plan  

E-Print Network [OSTI]

Renewables Portfolio Standard Procurement Plan November 2013 Roseville Electric 2090 Hilltop Circle Council will deliberate in public on the RPS Procurement Plan. Information distributed to the City Council regarding Roseville's renewable energy resources procurement status and future plans for consideration

209

FIRE MANAGEMENT PLAN MONTAGUE PLAIN  

E-Print Network [OSTI]

FIRE MANAGEMENT PLAN FOR MONTAGUE PLAIN WILDLIFE MANAGEMENT AREA #12;Fire Management Plan for Montague Plain Wildlife Management Area prepared for Massachusetts Dept. of Fisheries, Wildlife. 2003. Fire Management Plan for Montague Plain Wildlife Management Area. Department of Natural Resources

Schweik, Charles M.

210

EMSL Strategic Plan 2008  

SciTech Connect (OSTI)

This Strategic Plan is EMSLs template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges of the Department of Energy and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOEs Office of Biological and Environmental Research, and other key stakeholders. This Strategic Plan is fully aligned with the strategic plans of DOE and its Office of Science. We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Strategic Plan should be viewed as a living document for which we will continually evaluate changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly.

Campbell, Allison A.

2008-08-15T23:59:59.000Z

211

EMSL Contribution Plan  

SciTech Connect (OSTI)

This Contribution Plan is EMSLs template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOEs Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSLs workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSLs long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2 describes EMSLs detailed business plan, including an analysis of opportunity, organizational investments, and actionable milestones.

Campbell, Allison A.

2008-12-01T23:59:59.000Z

212

Environmental monitoring plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

Holland, R.C.

1997-02-01T23:59:59.000Z

213

10-Yr. Transmission Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Power Marketing Rates Power Marketing Rates 10-Yr Transmission Plan 2012 Customer Meeting Announcement Agenda 120611 CRSP South Projects CRSP South PowerPoint Presentation CRSP South 2009-2011 Capitalized Execution CRSP North Projects CRSP North PowerPoint Presentation CRSP North 2009-2011 Capitalized Execution About Power Marketing Transmission Newsroom Business Policies Products Plan contents OASIS News features Careers No FEAR act Organization chart Plan processes Functions News releases Doing business Privacy policy History General power contract provisions OATT Revisions Fact sheets Energy Services Accessibility Financial information Rates and Repayment Interconnection Publications EPTC Adobe PDF Power projects EPAMP Infrastructure projects Federal Register Notices

214

Building Technologies Office: Strategic Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Strategic Plans to Strategic Plans to someone by E-mail Share Building Technologies Office: Strategic Plans on Facebook Tweet about Building Technologies Office: Strategic Plans on Twitter Bookmark Building Technologies Office: Strategic Plans on Google Bookmark Building Technologies Office: Strategic Plans on Delicious Rank Building Technologies Office: Strategic Plans on Digg Find More places to share Building Technologies Office: Strategic Plans on AddThis.com... About Take Action to Save Energy Partner With DOE Activities Solar Decathlon Building America Research Innovations Research Tools Building Science Education Climate-Specific Guidance Solution Center Partnerships Meetings Publications Home Energy Score Home Performance with ENERGY STAR Better Buildings Neighborhood Program Challenge Home

215

Planning for Years to Come  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education...

216

Transition Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

and training needs for system operation and maintenance, planning for data migration, etc Transition Plan More Documents & Publications System Design Feasibility Study Report...

217

Career Planning | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Development Plan, identifying your specific career goals and how you'll acquire the knowledge and develop the skills necessary to achieve them. Career planning and professional...

218

Research deciphers HIV attack plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

deciphers HIV attack plan Research deciphers HIV attack plan These findings will help inform vaccine design and interpretation of vaccine trials, and provide new insights...

219

Transmission Planning | Department of Energy  

Office of Environmental Management (EM)

Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study made...

220

Community Energy Stategic Planning Resources  

Broader source: Energy.gov (indexed) [DOE]

Community Energy Strategic Planning Resources Technical Assistance Program January 24 th , 2013 2 Agenda 1. Welcome & overview 2. What is a community energy strategic plan and why...

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Sixth Northwest Conservation and Electric Power Plan Sixth Power Plan Action Plan  

E-Print Network [OSTI]

are organized by resource areas, Bonneville Power Administration, and Council monitoring activities. In manySixth Northwest Conservation and Electric Power Plan Sixth Power Plan Action Plan Introduction ................................................. 15 Future Role of Bonneville

222

Arguing About Plans: Plan Representation and Reasoning for Mixed-Initiative Planning  

E-Print Network [OSTI]

Arguing About Plans: Plan Representation and Reasoning for Mixed-Initiative Planning George into a microphone. Over thirteen hours of inter- action have been collected and transcribed (see (Gross, Allen

Ferguson, George

223

Policy & Strategic Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Laboratory Directed R&D Laboratory Directed R&D Office of Technology Commercialization and Partnerships Other Information BNL Site Index Can't View PDFs? Policy & Strategic Planning Directorate Policy and Strategic Planning (P&SP) Directorate coordinates development of the Laboratory Strategic Plan and annual business plans at the institutional and organizational Level. This function includes administration of the Laboratory Directed Research and Development (LDRD) program. The Directorate is also responsible for the Laboratory's technology transfer functions, including collaborations with industry and work for others; and for increasing funding from sources other than DOE. Organization Chart (pdf) Top of Page Last Modified: June 4, 2013 Please forward all questions about this site to: Teresa Baker

224

DOE Retro Analysis Plan  

Broader source: Energy.gov (indexed) [DOE]

Retro Analysis Plan Retro Analysis Plan August 2, 2011 Page 1 August 2, 2011 Daniel Cohen, Esq. Office of General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Re: Preliminary Plan for Retrospective Analysis Dear Mr. Cohen: These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice appearing in the July 11, 2011 Federal Register requesting comments on the Preliminary Plan for Retrospective Analysis of Existing Rules. We are encouraged by DOE's efforts to implement Executive Order 13563. We appreciate the actions already taken by DOE to address our concerns regarding the Final Rule on Certification, Compliance, and Enforcement Regulations for Consumer Products and Commercial and

225

Plan Your School Visit  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Your School Visit Plan Your School Visit For Teachers Teachers Visit the Museum We Visit You Teacher Resources Home Schoolers Plan Your School Visit invisible utility element Plan Your School Visit Chaperones To ensure that your students have the best possible experience at the Museum, we ask that you provide one chaperone for every 6 children. The chaperones should stay with their assigned group of students throughout the entire visit and model positive behavior. General Before arriving at the Museum, please remind your students about the following guidelines: If possible, leave food and drinks on the bus. Respect other visitors in the Museum by using inside voices, walking, etc. Please be gentle with the exhibits. Cameras are welcome at the Bradbury Science Museum. Have fun! Upon your arrival

226

CURRICULUM VITAE RESEARCH PLAN  

E-Print Network [OSTI]

CURRICULUM VITAE & RESEARCH PLAN Erik Schwartz Sørensen Ph. D. Theoretical Condensed Matter Physics Contents Curriculum vitae 3 Address . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20 Recent Invited Talks 21 Referees 22 #12; Erik Sørensen February 19, 2001 3 Curriculum vitae

Sørensen, Erik S.

227

Financial Planning Resource Allocation  

E-Print Network [OSTI]

Financial Planning Resource Allocation Human Resources Administrative Services Recruitment Management Leadership Studies Minor Admissions Information Desk & Game Center Fraternity/Sorority Life & Cross-Cultural Support Board Dining Medical Services Liaison for Faculty, Staff & Scholarships Retail

Barrash, Warren

228

Advance Care Planning Safeguards  

Science Journals Connector (OSTI)

To the Editors:We read with interest the recent article by Dr. Billings.1...In the article, Dr. Billings defines the goal of advance care planning as promoting the autonomy of decisionally incapac...

Sangeeta C. Ahluwalia PhD; MPH; Howard S. Gordon MD

2012-11-01T23:59:59.000Z

229

Environmental Monitoring Plan  

SciTech Connect (OSTI)

This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

1993-07-01T23:59:59.000Z

230

Developing a Marketing Plan  

E-Print Network [OSTI]

Developing a good marketing plan will help you identify and quantify costs, set price goals, determine potential price outlook, examine production and price risk, and develop a strategy for marketing your crop. This publication describes...

Bevers, Stan; Waller, Mark L.; Amosson, Stephen H.; McCorkle, Dean

2009-03-02T23:59:59.000Z

231

Environmental Implementation Plan  

SciTech Connect (OSTI)

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

232

Environmental Implementation Plan  

SciTech Connect (OSTI)

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

233

Technical Planning Basis  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Guide assists DOE/NNSA field elements and operating contractors in identifying and analyzing hazards at facilities and sites to provide the technical planning basis for emergency management programs. Cancels DOE G 151.1-1, Volume 2.

2007-07-11T23:59:59.000Z

234

2014- 2018 Strategic Plan  

Broader source: Energy.gov [DOE]

In April 2014, The Department of Energy released its 2014 - 2018 strategic plan, a comprehensive blueprint to guide the agency's core mission of ensuring America's security and prosperity by...

235

Strategic Plan: Implementation and  

E-Print Network [OSTI]

Findings From: Planning Interviews Stakeholder Survey Environmental Assessment Refine Mission and Vision Define Goals with Measurable Outcomes Develop Specific Strategies & Tactics Finalize;Improving lives and transforming healthcare.* Mission Statement ­ "Core Purpose" Vision Statement

Nguyen, Danh

236

Milestone Plan Process Improvement  

Broader source: Energy.gov (indexed) [DOE]

Milestone Plan Process Improvement Milestone Plan Process Improvement Milestone Plan Process Improvement Background In response to our community's concern over the milestone plan (MP) process within the system, the STRIPES Project Office initiated an in-depth evaluation of the required steps and issues surrounding this process. We concluded that the MP process could be improved for most users by tuning the system configuration. With the approval of both the STRIPES Executive Steering Committee and the STRIPES Project Office, we launched the MP Process Improvement Initiative. After many meetings with members of the STRIPES Team and Working Group, we are ready to "go-live" with this initiative. On October 1 st , 2012 the new MP process will be implemented for use by most field offices.

237

Site Sustainability Plan  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy U.S. Department of Energy Office of Legacy Management December 2013 LMS/S07225 This page intentionally left blank This page intentionally left blank U.S. Department of Energy Site Sustainability Plan December 2013 Doc. No. S07225 Page i Contents Abbreviations ................................................................................................................................. iii I. Executive Summary ...............................................................................................................1 II. Performance Review and Plan Narrative ...............................................................................9 1 GHG Reduction and Comprehensive GHG Inventory ...........................................................9

238

Greenhouse Gas Mitigation Planning  

Broader source: Energy.gov [DOE]

The Greenhouse Gas (GHG) Mitigation Planning section provides Federal agency personnel with guidance to achieve agency GHG reduction goals in the most cost-effective way. Using a portfolio-based management approach for GHG mitigation planning, agencies will be able to prioritize strategies for GHG mitigation. Agencies can also use this guidance to set appropriate GHG reduction targets for different programs and sites within an agency.

239

Lubbock Metropolitan Transportation Plan  

E-Print Network [OSTI]

in the foreground and the Lubbock Area Veterans Memorial in the background EXECUTIVE SUMMARY This Metropolitan Transportation Plan was developed based upon the four Lubbock Metropolitan Planning Organization?s (MPO) goals of Improve Safety ? Congestion...: researching proposed routes; studying environmental impacts; performing engineering surveys; holding public hearings; signing agreements with the counties or cities (if needed to fulfill state or federal requirements); acquiring right-of-way; producing...

Lubbock Metropolitan Planning Organization

2007-09-18T23:59:59.000Z

240

Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities  

SciTech Connect (OSTI)

This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs.

Nickels, J.M.

1991-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

OSU Bicycle Plan 2/10 OSU Bicycle Plan  

E-Print Network [OSTI]

OSU Bicycle Plan 2/10 DRAFT OSU Bicycle Plan Introduction Goals and Performance Measures (statistics and data points) Bicycle Network (circulation and parking) Bicycle Programs (incentives, outreach, education and enforcement) Improvement Plan #12;OSU Bicycle Plan 2/10 Introduction The 2010 Oregon State

Escher, Christine

242

Optimal Interdiction of Attack Plans Joshua Letchford  

E-Print Network [OSTI]

Economics, Security, Algorithms Keywords Game theory, security, planning, plan interdiction 1. INTRODUCTION

Vorobeychik, Eugene

243

Windward Community College Strategic Plan  

E-Print Network [OSTI]

.......................................................1 II. DESCRIPTION OF THE COLLEGE PLANNING PROCESS.......................................3 A with career exploration, technolo

244

UNL CAMPUS & LANDSCAPE MASTER PLANS  

E-Print Network [OSTI]

are to both support the upkeep and maintenance of existing landscapes on campus and to support the designPLAN BIG UNL CAMPUS & LANDSCAPE MASTER PLANS NOVEMBER 2013 #12;#12;PLAN BIG ARCHITECTURAL AND LANDSCAPE GUIDELINES #12;4 #12;5 TABLE OF CONTENTS INTRODUCTION Purpose and Introduction 6 The Plan Big

Farritor, Shane

245

REVIEW PLAN PINE CREEK LAKE  

E-Print Network [OSTI]

#12;REVIEW PLAN PINE CREEK LAKE McCurtain County, Oklahoma DAM SAFETY MODIFICATION STUDY TULSA LEFT BLANK #12;REVIEW PLAN Pine Creek Lake, Oklahoma Dam Safety Modification Study TABLE OF CONTENTS and Costs 17 13. Public Participation 19 14. Review Plan Approval and Updates 19 15. Review Plan Points

US Army Corps of Engineers

246

EIS-0472: Mitigation Action Plan  

Broader source: Energy.gov [DOE]

Uranium Leasing Program Mitigation Action Plan for the Final Uranium Leasing Program Programmatic Environmental Impact Statement

247

Plans, Implementation, and Results Glossary  

Office of Energy Efficiency and Renewable Energy (EERE)

Definitions of the office overview, plans, implementation, and results document and website categories are provided below:

248

Agent Program Planning Information Money Smart  

E-Print Network [OSTI]

Agent Program Planning Information Money Smart http participated in Money Smart classes: Habitat for Humanity, Head Start, workforce center clients, adult Planning Model plans have been developed for a Money Smart outcome plan and a Money Smart output plan

249

Environmental Implementation Plan  

SciTech Connect (OSTI)

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

Not Available

1994-02-01T23:59:59.000Z

250

List of Acronyms Acronyms in CIOSS Five-Year Plan  

E-Print Network [OSTI]

Information Systems GLOBEC Global Ocean Ecosystems Dynamics program GODAE Global Ocean Data Assimilation Satellite Studies COAS College of Oceanic and Atmospheric Sciences COAST Coastal Ocean Applications and Science Team CoOP Coastal Ocean Processes CoOP COASTCoastal Ocean Processes ­ Coastal Ocean Advances

Kurapov, Alexander

251

Alaska Strategic Energy Plan and Planning Handbook | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the Office of Indian Energy, is a tool for Alaska Native Villages and communities to use in achieving energy goals in both the near- and long-term. This Handbook intends to help Alaska Native leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building. The Handbook: Provides a step-by-step process that Alaska Native villages and communities may wish to use as a roadmap for discussion and decisions related to strategic energy planning and energy project prioritization Includes blank text boxes for communities to input their own

252

DRAFT Bear Safety Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bear Safety Plan June 2010 Bear Safety Plan June 2010 NSA_bsp_Rev9.doc 1 Atmospheric Radiation Measurement Climate Research Facility/ North Slope of Alaska/Adjacent Arctic Ocean (ACRF/NSA/AAO) Bear Safety Plan Background As a major part of DOE's participation in the US Global Change Research Program (USGCRP), the North Slope of Alaska (NSA) and Adjacent Arctic Ocean (AAO) Climate Research Facility (ACRF) exists on the North Slope of Alaska with its Central Facility near the town of Barrow. A secondary facility exists at Atqasuk, a town 100km inland from Barrow. Other instrumentation locations in more remote areas on the North Slope may be established in later stages of the project. Polar bears, and to a lesser extent, brown bears (barren ground grizzly) are significant hazards within the ACRF/NSA/AAO

253

PROJECT MANGEMENT PLAN EXAMPLES  

Broader source: Energy.gov (indexed) [DOE]

Baselines - Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP) for WBS 1.4 (FDH 1998). These cost and schedule details will provide the basis for a baseline change request that will be processed to revise the MYWP, consistent with the accelerated project plan presented below. 6.1 Project Baseline Overview This section of the IPMP presents the PFP baseline cost and schedule summary. The currently approved PFP Stabilization and

254

Report: Strategic Planning Impacts  

Broader source: Energy.gov (indexed) [DOE]

Strategic Planning Impacts Strategic Planning Impacts September 30, 2009 Submitted by the EMAB ARRA Implementation and Oversight Subcommittee Background: EM plans to use the influx of stimulus funding from the American Recovery and Reinvestment Act (ARRA) to fulfill compliance agreements, complete construction projects, and address the program's lower-tier activities such as decontamination and decommissioning (D&D) and soil and groundwater remediation. Using the ARRA funds to reduce the physical size of the EM complex will also help to lower overall lifecycle costs, create jobs, and allow the program to capitalize on its past successes. Implementation of ARRA is a high-visibility endeavor that has the potential to impact the EM base program's day-to-day operations and processes.

255

IT Capital Planning  

Broader source: Energy.gov (indexed) [DOE]

IT Capital Planning IT Capital Planning and Architecture Division (IM-21) Peter Lenentine, Director IM Organization Structure (as of 12/19/2013) Chief Information Officer (IM-1) Robert Brese Deputy Chief Information Officer Donald Adcock Associate CIO for Cyber Security (IM-30) Paul Cunningham (Acting) Corporate IT Project Management Office (IM-40) Frank Husson, Director Associate CIO for IT Planning, Architecture, and E-Government (IM-20) TheAnne Gordon Technology Evaluation Office (IM-50) Peter Tseronis, Director (Acting) Associate CIO for IT Corporate Management (IM-10) Sarah Gamage Associate CIO for Energy IT Services (IM-60) Virginia Arreguin Deputy Associate CIO for Cyber Security Paul Cunningham Deputy Associate CIO for Energy IT Services John Berthiaume (Acting) Human Capital and Administrative

256

Customer Service Plan  

Broader source: Energy.gov (indexed) [DOE]

Customer Service Plan Department of Energy Customer Service Plan - 2011 1 A Message from the Secretary Over the past two and a half years, the Obama Administration and the Department of Energy have worked to make the federal government more open for the American public and its own employees. Through these efforts, we have significantly expanded the amount and breadth of information available online about our programs and services. We have also transformed the way we communicate with the public by relaunching Energy.gov, making it an interactive, streamlined information platform. In April, President Obama directed federal agencies to take this ongoing effort one step further and establish Customer Service Plans, improving the public's interactions with the

257

MITIGATION ACTION PLAN  

Broader source: Energy.gov (indexed) [DOE]

MITIGATION ACTION PLAN MITIGATION ACTION PLAN KEMPER COUNTY IGCC PROJECT KEMPER COUNTY, MISSISSIPPI U.S. Department of Energy National Energy Technology Laboratory September 2010 2 INTRODUCTION The Department of Energy (DOE) issued a Final Environmental Impact Statement (EIS) for the Kemper County IGCC Project (Project) (DOE/EIS-0409) in May 2010 and a Record of Decision (ROD) in August 2010 (75 FR 51248). The ROD identified commitments to mitigate potential adverse impacts associated with the project. This Mitigation Action Plan (MAP) describes the monitoring and mitigation actions the recipient must implement during the design, construction, and demonstration of the Project. DOE prepared this MAP in accordance with 10 CFR § 1021.331. PURPOSE Section 1021.331 of the DOE regulations implementing NEPA (10 CFR Part 1021) provides

258

INL Executable Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ID-11383 ID-11383 Revision 2 INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report December 2010 (This Page Intentionally Left Blank) DOE/ID-11383 Revision 2 INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report December 2010 Prepared for the U.S. Department of Energy DOE Idaho Operations Office (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) (This Page Intentionally Left Blank) INL FY 2011 Site Sustainability Plan with the FY 2010 Annual Report DOE/ID-11383 Revision 2 December 2010 Approved By: ~~~/ Jeffrey~USseau Fa~ 7 Dlte President and General Manager , - Bechtel BWXT Idaho, LLC Advanced Mixed Waste Treatment Project (This Page Intentionally Left Blank)

259

DOE CONTRACTOR PENSION PLANS  

Broader source: Energy.gov (indexed) [DOE]

1-13 1-13 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental remediation, infrastructure services and other site-specific project completion contracts. DOE-H-1002 EMPLOYEE COMPENSATION: PAY AND BENEFITS (a) Contractor Employee Compensation Plan The Contractor shall submit, for Contracting Officer approval, by (fill-in

260

High Risk Plan  

Broader source: Energy.gov (indexed) [DOE]

Risk Plan Risk Plan John Bashista Melissa Rider Jeff Davis Timeline to date * OMB memo on Improving Government Acquisition issued July 29, 2009 - Review existing contracts and acquisition practices to save 7% of baseline contract spending (3.5% in FY 2010 and 3.5% in FY 2011) - Reduce high risk contracts by 10% the share of dollars obligated in FY2010 - Final plan was due and submitted on November 2, 2009 - OMB reviewed and requested revision Dec 23, 2009 - Revision submitted April 21, 2010 M&Os are an Issue * With respect to reductions in high risk contracting strategies, the M&O contracts was also a challenge since the opportunity to further influence competition and contract type was highly constrained. The Department had already competed approximately 85 percent of its M&O

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Standard Review Plan Overview  

Broader source: Energy.gov (indexed) [DOE]

Technical Framework for EM Projects Critical Decision (CD) Technical Framework for EM Projects Critical Decision (CD) Milestones Review & Approval Standard Review Plan (SRP) E n v i r o n m e n t a l M a n a g e m e n t DOE - EM - SRP - 2010 2nd Edition Overview March 2010 This page intentionally left blank. Standard Review Plan, 2 nd Edition, March 2010 1 Standard Review Plan Overview Technical Framework for EM Projects Critical Decision Milestones Review and Approval The Office of Environmental Management (EM) is responsible for managing the design, construction, operation, and eventual disposition of mission-critical projects/facilities. Coupled with this ongoing mission is the added responsibility for EM to diligently leverage and apply American Recovery and Reinvestment Act (ARRA) funds to accelerate the completion of its

262

IT Capital Planning  

Broader source: Energy.gov (indexed) [DOE]

IT Capital Planning IT Capital Planning and Architecture Division (IM-21) Carol Blackston, Director (Acting) IM Organization Structure (as of 1/13/2014) Chief Information Officer (IM-1) Robert Brese Deputy Chief Information Officer Donald Adcock Associate CIO for Cyber Security (IM-30) Paul Cunningham (Acting) Corporate IT Project Management Office (IM-40) Frank Husson, Director Associate CIO for IT Planning, Architecture, and E-Government (IM-20) Russell Pereira (Acting) Associate CIO for Technology Evaluation and Chief Technology Officer (IM-50) Peter Tseronis Associate CIO for IT Corporate Management (IM-10) Sarah Gamage Associate CIO for Energy IT Services (IM-60) Virginia Arreguin Deputy Associate CIO for Cyber Security Paul Cunningham Deputy Associate CIO for Energy IT Services Steve Cox (Acting)

263

Human Capital Plan  

Broader source: Energy.gov (indexed) [DOE]

Plan Plan Bea Dukes Melissa Rider AHCP Issues  Decentralization of Contracting Process within DOE  In spite of MA and CFO guidance, the actual (FTE) growth of Acquisition Workforce depends on Program Office and/or site level management Recap of this year's planning process  Thanks for your efforts on the development and consolidation of this year's AHCP  Collaborative effort with most HCA level activities  A few glitches ◦ OMB Template very confusing and required much clarification ◦ Many changes throughout the process  Thanks for your patience ◦ Lesson Learned: SPE, CFO, HC and Program Offices must be in synchronization Fallout  Additional funding called out in FY11 -

264

DAF Glovebox Project Plan  

SciTech Connect (OSTI)

This document defines how the glovebox project will be managed and executed. It provides a path forward for establishing a glovebox capability in Building 341 of the DAF in time to meet JASPER programmatic requirements as the first user. Note that some elements of the glovebox project have been under way for some time and are more mature than others; other elements are being worked concurrently. This plan serves the following purposes: Assign organizational and individual responsibilities for bringing the glovebox capability online; Coordinate activities between organizations; Facilitate communication between project members and management; and Identify the mechanisms used to manage and control the project. The scope of this plan includes all activities conducted to achieve project objectives, culminating in DOE/NV approval to operate. This plan does not address the issues associated with the steady-state operation of the glovebox.

Martinez, M.W.; Higgs, R.L.

2000-11-14T23:59:59.000Z

265

Energy Organizational Planning  

SciTech Connect (OSTI)

As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

Gina C. Paradis; James Yockey; Tracey LeBeau

2009-04-17T23:59:59.000Z

266

EMSL Strategic Plan 2008  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7753 7753 EMSL Strategic Plan 2008 AA Campbell August 2008 Prepared for the U.S. Department of Energy's Office of Biological and Environmental Research under Contract DE-AC05-76RL01830 Pacific Northwest National Laboratory Richland, Washington 99352 iii Environmental Molecular Sciences Laboratory Strategic Plan Our Mission EMSL, a U.S. Department of Energy national scientific user facility located at Pacific Northwest National Laboratory, provides integrated experimental and computational resources for discovery and technological innovation in the environmental molecular

267

PICs Implementation Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WIPP 04-2301 WIPP 04-2301 Passive Institutional Controls Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-2301 Passive Institutional Controls Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-2301 i Table of Contents List of Tables .....................................................................................................................ii

268

Strategic Action Plan  

Broader source: Energy.gov (indexed) [DOE]

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

269

Permanent Markers Implementation Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

WIPP 04-3302 WIPP 04-3302 Permanent Markers Implementation Plan August 19, 2004 United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico DOE/WIPP 04-3302 ii Permanent Markers Implementation Plan Waste Isolation Pilot Plant Carlsbad, New Mexico August 19, 2004 Prepared for: Washington Regulatory and Environmental Services an affiliate of Washington TRU Solutions, LLC P.O. Box 2078 Carlsbad, New Mexico 88221 Prepared by: John Hart and Associates, P.A. 2815 Candelaria Road, N.W. Albuquerque, New Mexico 87107 (505) 344-7868 DOE/WIPP 04-3302 iii Table of Contents Table of Contents.................................................................................................

270

Plutonium Vulnerability Management Plan  

SciTech Connect (OSTI)

This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

NONE

1995-03-01T23:59:59.000Z

271

Implementing Motor Decision Plans  

E-Print Network [OSTI]

Implementing Motor Decision Plans R. Neal Elliott, Ph.D., P.E., Senior Associate American Council for an Energy-Efficient Economy (ACEEE), Washington, DC Abstract The first step to reducing energy costs and increasing reliability in motors... is chosen with limited regard to the short or long-tenn cost. This paper discusses how to develop a plan appropriate to the needs of a particular facility. Introduction In most cases, the opportunity to install a more efficient motor isO available...

Elliott, R. N.

272

Environmental protection implementation plan  

SciTech Connect (OSTI)

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

Holland, R.C.

1998-03-01T23:59:59.000Z

273

Workforce Plans | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Policy and Guidance » Human Capital Management » Workforce Plans Policy and Guidance » Human Capital Management » Workforce Plans Workforce Plans Workforce Planning is an integral part of the human capital planning process. The intent of every workforce planning effort is to ensure that organizations have the resources necessary to meet mission requirements and program priorities. To achieve this intent, organizations must first identify and understand those mission requirements and program priorities; typically through Strategic Planning. These goals and objectives not only provide the basis for determining necessary financial resources, but they also provide the basis for determining workforce needs. For assistance with creating or modifying your workforce plans please see our Guide to Workforce Planning Documents Available for Download

274

Strategic Plans | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Strategic Plans Strategic Plans Strategic Plans September 20, 2013 DOE OIG Strategic Plan Fiscal Years 2014 - 2019 The Office of Inspector General's plan to strengthen the integrity, economy, and efficiency of the Department's programs and operations. December 31, 2007 DOE OIG Strategic Plan Fiscal Years 2009 - 2013 This Strategic Plan offers a glance at the Office of the Inspector General's long term effort to work with the Department of Energy's leadership to improve the management and performance of the Department's programs and operations. December 31, 2002 DOE OIG Strategic Plan Fiscal Years 2003-2008 This plan represents the Office of the Inspector General's vision and strong commitment for improving the management and performance of the Department of Energy's many programs and operations

275

Performance Plans | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Performance Plans Performance Plans Performance Plans December 13, 2013 Combined Fiscal Year (FY) 2013 Annual Performance Results and FYs 2014 and 2015 Annual Performance Plan Combined Fiscal Year (FY) 2013 Annual Performance Results and FY 2014-15 Annual Performance Plan December 18, 2012 Combined Fiscal Year (FY) 2012 Annual Performance Results and FYs 2013 and 2014 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2012 actual performance and FYs 2013 and 2014 planned activities. November 28, 2011 Combined Fiscal Year (FY) 2011 Annual Performance Results and FY 2012 Annual Performance Plan This report presents the goals, objectives, and strategies for measuring the OIG's FY 2011 actual performance and FY 2012 planned activities.

276

Cooperative Education (co-op) at the University of Connecticut is a paid work experience which allows undergraduate students to integrate classroom learning with training related to their professional and/or  

E-Print Network [OSTI]

Cooperative Education (co-op) at the University of Connecticut is a paid work experience which of Connecticut degree program. The employer is not obligated to offer the student permanent employment upon and/or conference calls by the University of Connecticut for the purpose of evaluating a student

Alpay, S. Pamir

277

Strategic Plans | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Strategic Plans Strategic Plans Strategic Plans The strategic planning process charts the course for the U.S. Department of Energy (DOE) Building America program's efforts to widely deploy new integrated packages of energy-saving measures in new and existing homes. These living documents give an overview of Building America's research approach to evaluate specific building system options for reliability, cost-effectiveness, and marketability. Here you can learn more by reading strategic planning reports for specific research areas. Standing Technical Committees The Building America program actively engages all relevant industry stakeholders in the research planning process, primarily through Standing Technical Committees (STCs). STCs focus on identifying and resolving key

278

Strategic Plan Recreation Management  

E-Print Network [OSTI]

Strategic Plan Recreation Management Department Brigham Young University 2013 #12;Vision We strive in meaningful recreational experiences. Core Values We value the role wholesome recreation plays in the well strive to make meaningful contributions to both recreation related research and practice. Department

Olsen Jr., Dan R.

279

A plan for action  

Science Journals Connector (OSTI)

......to see how the peer-review element to arrive at...Comprehensive Spending Review and try to reverse some...should fol- low up our review, published jointly with...can improve this. I plan to start with a personal...microchannel plate camera, a standard technique in X-ray......

Michael Rowan Robinson

2006-10-01T23:59:59.000Z

280

Plan ?: core or cusp?  

Science Journals Connector (OSTI)

......research-article Article Plan beta: core or cusp? Thomas...Breddels (2013) for a detailed review of the more sophisticated numerical...is available for each star (standard technique). Large data sets...velocity space, we use the standard definition, for the velocity......

Thomas D. Richardson; Douglas Spolyar; Matthew D. Lehnert

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

EMERGENCY PLANNING AND PROCEDURES  

E-Print Network [OSTI]

EMERGENCY PLANNING AND PROCEDURES HANDBOOK FOR CWRU EMPLOYEES August 2013 #12;CWRU EMERGENCY innovation, technology, teamwork, public- private co- operation and vigilance. Mission Statement We increase appropriately to any crisis or emergency. This handbook is comprehensive and provides employees with information

Cavusoglu, Cenk

282

EMERGENCY PLANNING AND PROCEDURES  

E-Print Network [OSTI]

EMERGENCY PLANNING AND PROCEDURES HANDBOOK FOR CWRU STUDENTS August 2013 #12;CWRU EMERGENCY innovation, technology, teamwork, public- private co- operation and vigilance. Mission Statement We increase. This handbook is comprehensive and provides studetns with information on how to prepare for and respond

Cavusoglu, Cenk

283

Climate Change Scoping Plan  

E-Print Network [OSTI]

Climate Change Scoping Plan a amework for change as approved Prepared by the California AirBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

284

Climate Change Scoping Plan  

E-Print Network [OSTI]

Climate Change Scoping Plan a amework for change Prepared by the California Air Resources BoardBackgroundBackgroundBackground ............................................................................................................................................................................................................................................................................................................................................................................................................ 4444 1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California1. Climate Change Policy in California

285

Poster Resources Poster Planning  

E-Print Network [OSTI]

Poster Resources Poster Planning � Discovery Day: Tips for Successful Posters by University of South Carolina Office of Undergraduate Research � Creating Effective Poster Presentations by George Hess, Kathryn Tosney, Leon Liegel http://www.ncsu.edu/project/posters/NewSite/index.html � How to Write

Almor, Amit

286

COMMUNITY WILDFIRE PROTECTION PLANS  

E-Print Network [OSTI]

natural resource knowledge and technical expertise to the planning process, particularly in the areas of GIS and mapping, vegetation management, assessment of values and risks and funding strategies. WHAT of the community, priorities for fuel treatment may include critical watersheds, public water and power facilities

287

Planning for Cities  

Science Journals Connector (OSTI)

... of the techniques-or the disciplines -which should by now inform the work even of pedestrian city planners. The fact that the planning study which has been carried out for ... s ahurch is an obvious need. Some skill has been spent on devices for separating pedestrians and wheeled traffic, chiefly by erecting ...

1968-11-23T23:59:59.000Z

288

ALGAE PLANS BLOOM  

Science Journals Connector (OSTI)

ALGAE PLANS BLOOM ... From PERSONAL CARE TO FISH FOOD, algae firms look for ways to make profits quickly ... ALGAE-GROWING cleantech firms are enjoying a burst of attention, triggered by Solazymes successful initial public offering (IPO) of stock in May. ...

MELODY M. BOMGARDNER

2011-07-18T23:59:59.000Z

289

Planning European space science  

Science Journals Connector (OSTI)

......scientists were aiming for the outer solar sys- tem, for multi-spacecraft...planning process is to identify key technologies to be developed so that identified...are good prospects for better solar-cell technology for planetary missions as far......

Martin Barstow

2004-12-01T23:59:59.000Z

290

Designing a Benchmarking Plan  

Broader source: Energy.gov [DOE]

U.S. Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) Weatherization and Intergovernmental Program (WIP) Solution Center document about how state and local governments, Indian tribes, and overseas U.S. territories can design a plan to benchmark the energy consumption in public buildings.

291

2011 Strategic Plan  

Broader source: Energy.gov [DOE]

In May 2011, The Department of Energy today released its 2011 strategic plan, a comprehensive blueprint to guide the agency's core mission of ensuring America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions.

292

Plans, Implementation, and Results  

Broader source: Energy.gov [DOE]

The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

293

Corporate Plan Corporate Publications  

E-Print Network [OSTI]

Commission Scotland planned income and expenditure 24 Measuring Performance Developing performance measures providing the difference between income raised and expenditure incurred. We operate in accordance with full-cash charges levied on the capital value tied up in the national forest estate. The 2004 Spending Review

294

Marketing Plan Company Description  

E-Print Network [OSTI]

Marketing Plan Company Description: Consumer company that provides a product to helps boost Marketing Swat Team Project Description and Deliverables: The team will Identify the best online vehicles of promotions from YouTube celebs, co- marketing with related businesses, affiliate marketing, cross marketing

Dahl, David B.

295

Refinery Planning under Uncertainty  

Science Journals Connector (OSTI)

The planning/scheduling of the supply chain under uncertainty is important in light of the ever-changing market conditions. ... Examples of the open-shop mode, such as the news vendor model26 in which the sales of holiday lights disappear after Christmas, for instance, can be found in the real world. ...

Wenkai Li; Chi-Wai Hui; Pu Li; An-Xue Li

2004-09-10T23:59:59.000Z

296

Gonzales Comprehensive Plan  

E-Print Network [OSTI]

Programs (NFIP) Community Rat- ing System (CRS) which reduces the premiums for policy holders within the municipality. In terms of improving the human environment, the plan addresses the impacts of the oil and gas industry as well as improving trails............242 Environment.....245 Future Environment..........283 Policy Table.........288 Appendix....292 Urban Design...

Bright, Elise; Cutaia, Louis; Barrios, Nair; Brinkman, Travis; Caraballo, Stephany; Chen, Long; Coleman, Alex; Crosby, Kevin; Dai, Boya; Espinoza, Carlos; Han, Dondjin; Hansen, Todd; Hyde, Allison; Lazaro, Cristopher; Lin, Rosie; Lopez, Michael; Martin, Michael; Masterson, Jaimie Hicks; Medina, Izel; Peackock, Walter M; Sengupta, Koly; Shelnutt, Andrew; Su, Jin; Tan, Shuman; Tang, Taoi; Tran, Tho

2013-01-01T23:59:59.000Z

297

Student Health Benefit Plan  

E-Print Network [OSTI]

and programs tailored to the needs of students. The SHBP coordinates care with University Health Services (UHS), UMass Amherst's fully accredited health center. UHS provides comprehensive primary care, walk-in care2 2013-2014 Student Health Benefit Plan (SHBP) Designed for the Students of Policy Period: August 1

Massachusetts at Amherst, University of

298

Search Criteria Health Plan  

E-Print Network [OSTI]

Search Criteria Location: Distance: Health Plan: Provider Type: San Diego, CA 92103 Within 10 miles another provider, you are seeking care from that provider, not from Anthem Blue Cross. The provider benefit decisions only and are not the provision of medical care. Anthem Blue Cross is not responsible for

Gleeson, Joseph G.

299

6 Management Plan Introduction  

E-Print Network [OSTI]

and enhance the fish and wildlife populations and the aquatic and terrestrial ecosystems that exist within for restoration of fish and wildlife habitat and populations which form the bulk of the management plan is derived or the inventory. The assessment and inventory are designed and may be used to guide restoration and management

300

Hoechst plans Mexican unit  

SciTech Connect (OSTI)

Hoechst is considering plans to build its first ethoxylates project in Mexico, Mark Sijthoff, head of surfactants and auxiliaries for Hoechst`s specialty chemical business unit, tells CW. The company expects to make a decision on the 30,000-m.t./year project by the end of the year. Sijthoff would not disclose the site or where ethylene oxide (EO) feed would be obtained. The plan may depend on results of the privatization of Petroleos Mexicanos (Pemex), which is the only producer of EO in Mexico. Hoechst is part of a consortium bidding on the privatization. Sources say the unit will be built at Quimica Hoechst`s Coatzacoalcos site, close to Pemex`s EO plants at Cangregera and Morelos. A planned EO expansion at Morelos will probably move ahead when the sell-off is completed. Sijthoff says that Hoechst is also looking at improving its US surfactants position, although the company has no plans to expand ethoxylates, as there is {open_quotes}plenty of capacity.{close_quotes} Hoechst started up a 150-million lbs/year plant at Clear Lake, TX last year, ending a tolling agreement with Union Carbide. In addition, Rhone-Poulenc recently started a unit at Marcus Hook, PA, and Condea Vista is doubling its ethoxylation capacity at Lake Charles, LA. Meanwhile, Hoechst is still considering construction of 30,000-m.t./year ethoxylation plant in India or China. A decision is expected later this year.

Wood, A.; Alperowicz, N.

1996-05-22T23:59:59.000Z

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Fermilab Master Plan Fermilab Master Plan Overview Presentation  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Master Plan Master Plan Fermilab Master Plan Overview Presentation Mission Support Organization Planning Winter Workshop Feb 20, 2013 Thursday, February 21, 13 Fermilab Master Plan Integrating the new vision for the Intensity Frontier facilities and other Science with a sound strategy for infrastructure and support facility development Thursday, February 21, 13 Fermilab Master Plan In order to help define and best use all laboratory resources to most effec5vely and efficiently meet Fermilab's Plan for Discovery, the laboratory is developing a Fermilab Campus Master Plan (FCMP) for the next 20 years. The document will guide the development of modern, produc5ve, and efficient laboratory facili5es that will enable the laboratory to fulfill its mission of advancing

302

Planning support systems for spatial planning through social learning  

E-Print Network [OSTI]

This dissertation examines new professional practices in urban planning that utilize new types of spatial planning support systems (PSS) based on geographic information systems (GIS) software. Through a mixed-methods ...

Goodspeed, Robert (Robert Charles)

2013-01-01T23:59:59.000Z

303

Hydrogen Posture Plan: An Integrated Research, Development and Demonstration Plan  

Broader source: Energy.gov [DOE]

The 2006 Hydrogen Posture Plan satisfies Section 804 of the Energy Policy Act of 2005, which requires that the Secretary of Energy transmit to Congress a coordinated plan for the Departments hydrogen and fuel cell programs.

304

Architecture & Urban Planning College of Architecture & Urban Planning  

E-Print Network [OSTI]

Architecture & Urban Planning College of Architecture & Urban Planning Architecture (ARCH) 300 projects for the remainder of the term. 560 Macroecon Envir Bus 3.00 ADVISORY, ENFORCED 74595 P RW REC 451

Shyy, Wei

305

Architecture & Urban Planning College of Architecture & Urban Planning  

E-Print Network [OSTI]

Architecture & Urban Planning College of Architecture & Urban Planning Architecture (ARCH) 690 Arc is reserved for Executive MBA students only, and meets from 7/19- 9/6. 637 Macroecon Envir Bus 1.50 ADVISORY

Shyy, Wei

306

Performance Confirmation Plan  

SciTech Connect (OSTI)

As described, the purpose of the Performance Confirmation Plan is to specify monitoring, testing, and analysis activities for evaluating the accuracy and adequacy of the information used to determine that performance objectives for postclosure will be met. This plan defines a number of specific performance confirmation activities and associated test concepts in support of the MGR that will be implemented to fulfill this purpose. In doing so, the plan defines an approach to identify key factors and processes, predict performance, establish tolerances and test criteria, collect data (through monitoring, testing, and experiments), analyze these data, and recommend appropriate action. The process of defining which factors to address under performance confirmation incorporates input from several areas. In all cases, key performance confirmation factors are those factors which are: (1) important to safety, (2) measurable and predictable, and (3) relevant to the program (i.e., a factor that i s affected by construction, emplacement, or is a time-dependent variable). For the present version of the plan, performance confirmation factors important to safety are identified using the principal factors from the RSS (CRWMS M and O 2000a) (which is derived from TSPA analyses) together with other available performance assessment analyses. With this basis, key performance confirmation factors have been identified, and test concepts and test descriptions have been developed in the plan. Other activities are also incorporated into the performance confirmation program outside of these key factors. Additional activities and tests have been incorporated when they are prescribed by requirements and regulations or are necessary to address data needs and model validation requirements relevant to postclosure safety. These other activities have been included with identified factors to construct the overall performance confirmation program.

Lindner, E.N.

2000-05-19T23:59:59.000Z

307

CHEIBA Trust Employee Benefit Plan 2013 PlanYear  

E-Print Network [OSTI]

UNIVERSITY OF DENVER UNIVERSITY OF NORTHERN COLORADO WESTERN STATE COLORADO UNIVERSITY 2013 Benefit Plan YearCHEIBA Trust Employee Benefit Plan 2013 PlanYear Sponsored by - Colorado Higher Education Insurance HIGHER EDUCATION CENTER COLORADO SCHOOL OF MINES COLORADO STATE UNIVERSITY ­ PUEBLO COLORADO STATE

308

5285 rural recreation planning [n] [US  

Science Journals Connector (OSTI)

landsc. plan. pol. recr. (? recreation planning ); syn. countryside recreation planning [n] [UK];splanificacin [f] recreacional en zonas rurales (Planificac...

2010-01-01T23:59:59.000Z

309

OREM Program Plan | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Mission OREM Program Plan OREM Program Plan The Oak Ridge Office of Environmental Management's (OREM) Program Plan discusses the vision, goals, and strategy for 2014-2024. The...

310

Plans and Reports | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Plans and Reports Plans and Reports The U.S. Department of Energy (DOE) Sustainability Performance Office (SPO) plans and reports progress on sustainability metrics set by...

311

Project Management Plans | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to...

312

2012 Quality Assurance Improvement Project Plan | Department...  

Office of Environmental Management (EM)

2 Quality Assurance Improvement Project Plan 2012 Quality Assurance Improvement Project Plan This Project Plan is jointly developed by the Department of Energy (DOE) Office of...

313

NATIONAL PLAN TO ACHIEVE MARITIME DOMAIN AWARENESS  

E-Print Network [OSTI]

infrastructure following attack or similar disruption. · Maritime Transportation System Security Plan responds regarding the maritime domain. · Maritime Commerce Security Plan establishes a comprehensive plan to secure

Acton, Scott

314

Best Management Practice #1: Water Management Planning  

Broader source: Energy.gov [DOE]

A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

315

2014 DOE Strategic Sustainability Performance Plan | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

2014 DOE Strategic Sustainability Performance Plan 2014 DOE Strategic Sustainability Performance Plan In the 2014 DOE Strategic Sustainability Performance Plan, DOE pledges to...

316

2014 Site Sustainability Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2014 Site Sustainability Plan 2014 Site Sustainability Plan The purpose of this Site Sustainability Plan (SSP) is to outline the strategies for managing, funding, and implementing...

317

PLANNING UNIT October 26, 2009  

E-Print Network [OSTI]

PLANNING UNIT October 26, 2009 Advertisement for TRIPP Chair in the Institute A large number research work in the area of Transportation Planning for control of accidents and pollution with special

Prasad, Sanjiva

318

NASA PLANS RETURN TO MOON  

Science Journals Connector (OSTI)

NASA PLANS RETURN TO MOON ... By the end of the next decade, the moon will again be visited by humans, according to plans announced by NASA on Dec. 4. Unlike NASA's previous human missions to the moon, however, this plan would set up a permanent, self-sustaining lunar base at the south pole. ... As part of the plan, NASA would launch a series of robotic missions to study the moon in detail over the next few years. ...

2006-12-11T23:59:59.000Z

319

2030 Transportation and Mobility Plan  

E-Print Network [OSTI]

sections are as follows: 1. Introduction 2. Bi-State MPO Area Description 3. Planning Horizon Description and Data Projections 4. Long Range Plan Presentation 5. Plan Implementation and Monitoring Procedures 6. Bi-State MPO 2030 Transportation..., improved access at the Leigh Avenue/I-540 interchange, and the deployment of appropriate Intelligent Transportation Systems (ITS) projects. The Airport Master Plan Update has estimated a total airport improvement cost of $ 74,170,000 over a Three (3...

Bi-State Metropolitan Planning Organization

2006-08-11T23:59:59.000Z

320

ESPC ENABLE ACQUISITION PLAN TEMPLATE  

Broader source: Energy.gov [DOE]

Template serves as a tool to help agencies develop an acquisition plan. The acquisition plan is the first formal step in the Energy Savings Performance Contract (ESPC) ENABLE procurement process. The completed acquisition plan will serve as a guide throughout the rest of the process.

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

KINGSTON UNIVERSITY FRAUD RESPONSE PLAN  

E-Print Network [OSTI]

KINGSTON UNIVERSITY FRAUD RESPONSE PLAN KUIA Page 1 09/12/2008 1. INTRODUCTION The purpose of this plan is to formalise the responsibilities and action plan in the event of a suspected fraud of irregularities in the event of fraud and corruption. The suspicion of fraud and irregularity is currently

Jones, Graeme A.

322

November 2006 CHEMICAL HYGIENE PLAN  

E-Print Network [OSTI]

.4 LABORATORY-SPECIFIC SAFETY PLANS 4.5 LABORATORY SAFETY AUDITS 4.6 CHEMICAL HYGIENE PLAN REVIEW 5.0 LABORATORYNovember 2006 1 CHEMICAL HYGIENE PLAN (November 2006) Department of Chemistry Vanderbilt University #12;November 2006 2 1.0 INTRODUCTION 2.0 THE LABORATORY STANDARD 3.0 SCOPE AND APPLICATION 4

Bordenstein, Seth

323

Action Plan UNIVERSITY OF MISSOURI  

E-Print Network [OSTI]

Energy, Energy Economics and Policy, and Energy-related Commercialization & Business Development. Other, transportation will play a larger role in its greenhouse gas profile. The Climate Action Plan recommends sustain- ability plan. While the initial Climate Action Plan focuses primarily on greenhouse gas emissions

Taylor, Jerry

324

UC Operational Plan 2006 INTRODUCTION  

E-Print Network [OSTI]

(FMP) including a financial forecast model and capital expenditure plan April Finance Manager 3-2006) and develop a follow-on Financial Management Plan which will include a financial forecast model and a capital expenditure plan Operational Steps 2006 Timeline Task Responsibility 1. Complete the implementation

Hickman, Mark

325

Sample Lesson Plan Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection 1 Sample Lesson Plan  

E-Print Network [OSTI]

, Emergency Action Plans, Fire Prevention Plans, and Fire Protection Overview of the OSHA Standard Subpart E problems finding and using it. Subpart L, Fire Protection, contains requirements for fire brigades, and all installed to meet the fire protection requirements of 29 CFR Part 1910. Step 1: Planning the Lesson

Homes, Christopher C.

326

Clean Energy Business Plan Competition  

ScienceCinema (OSTI)

Top Students Pitch Clean Energy Business Plans The six regional finalists of the National Clean Energy Business Plan Competition pitched their business plans to a panel of judges June 13 in Washington, D.C. The expert judges announced NuMat Technologies from Northwestern University as the grand prize winner.

Maxted, Sara Jane; Lojewski, Brandon; Scherson, Yaniv;

2013-05-29T23:59:59.000Z

327

October 12, 2009 Strategic Planning Session  

E-Print Network [OSTI]

: Maintenance & Ops # hot/cold calls 15% or Inst +/5% 39% 6.1.6 Landscape Cost/GSF +/5% of APPA Avg for Peer Inst +/5% 49% 6.1.7 Exceed Labor time (request to receipt time) Maintenance work

Howitt, Ivan

328

PROJECT MANGEMENT PLAN EXAMPLES  

Broader source: Energy.gov (indexed) [DOE]

End Point Closeout Examples Example 77 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field representative will verify acceptable completion of the applicable activity. Verification may be performed by reviewing documents, letters, photos, work packages, or work plans, or by visual inspection. When all the endpoints for a specific area of the building have been completed and verified, designated BWHC and BHI management will sign for completion and acceptance of that

329

Individual Development Plan (IDP)  

Broader source: Energy.gov (indexed) [DOE]

Individual Development Plan (IDP) Individual Development Plan (IDP) SAMPLE 10/01/2012 to 09/30/2013 Training Reason Developmental Activity Description Training Cost Travel Cost Total Cost Hours Start Date/ Completion Date Short Range Goal 1: Enhance Leadership Skills Development Mentoring Receive mentoring from a higher grade employee (s) and provide mentoring to lower grade employee(s). 0 0 0 TBD 1/1/2013 Development Instructor led EM Leadership Excellence Program - Interpersonal Communication Skills 0 0 0 8 6/15/2013 Development Instructor led Federal Executive Institute (OPM): Leadership for a Democratic Society $18,300 0 0 30 day residential TBD Development Shadowing Shadow one or more SES employees for one or two day period to learn leadership techniques. 0 0 0 TBD TBD

330

Plan Your Arrival  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan Your Arrival Plan Your Arrival Special arrangements and training are required for your first visit. When you complete your APS orientation, you will be issued an APS badge. With this badge you may enter the site at any time. Notify User Office When you know which beamline you'll be using and the date of your beam time, contact the User Office. We will check the status of your request for access and schedule any required orientation and training (630-252-9090, apsuser@aps.anl.gov). If you will arrive outside of normal business hours, you must notify the User Office in advance so we can arrange for gate access. Make Travel Arrangements When the User Office has notified you that you have been approved for access and your training has been scheduled, you may make your travel

331

PROJECT MANGEMENT PLAN EXAMPLES  

Broader source: Energy.gov (indexed) [DOE]

Approach to Meeting Requirements Examples Approach to Meeting Requirements Examples Example 26 9.2 HEALTH AND SAFETY STRATEGY B Plant has integrated safety into its management, planning and work practices in order to protect the public, the environment and facility workers against nuclear and non-nuclear hazards associated with facility transition. Based upon the principles of DNFSB Recommendation 95-2, the Plant's approach to safety management includes:  Applicable. standards and requirements specifically identified and implemented  Safety integrated into baseline and detailed planning  Workers and trained safety professionals use a team approach in hazard identification, analysis and control  Graded approach used to tailor controls based upon hazard type and severity

332

Proj. Plan Example SEM  

Broader source: Energy.gov (indexed) [DOE]

Project Plan Project Plan December 1997 U. S. DEPARTMENT OF ENERGY Office of the Chief Information Officer and Headquarters Collaboration Group Change Control Page The change control page will be used to record information for controlling and tracking modifications made to this document. Revision Date: 12/15/97 Author: Brian Field a. Section(s): 2.3 Page Number(s): 2-2 through 2-4 Summary of Change(s): Updated roles and responsibilities chart to include known resources. b. Section(s): 3.6 & 3.7 Page Number(s): 3-8 through 3-10 Summary of Change(s): Modified Resource Loading Chart to reflect current estimates. Modified Project/Deliverable Schedule to reflect current status of project. c. Section(s): Page Number(s): Summary of Change(s):

333

Community Relations Plan Update  

Office of Legacy Management (LM)

8-TAR 8-TAR MAC-MRAP 1.9.1 Monticello Mill Tailings Superfund Site and Monticello Vicinity Properties Superfund Site Monticello, Utah Community Relations Plan Update FY 2001 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Prepared by MACTEC Environmental Restoration Services, LLC Grand Junction, Colorado Work performed under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy For more information or to request additional copies of this document, please call (800) 269-7145 (Utah only) or Monticello Repository Office Complex (435) 587-4000 DOE Grand Junction Office Community Relations Plan Update FY 2001 Page v Table of Contents Terms and Abbreviations........................................................................................................... vii

334

Mon Valley work plan  

Office of Legacy Management (LM)

GWSHP 1.8 GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for Characterization Activities at the Shiprock UMTRA Project Site June 1998 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number UGW-511-0020-01-000 Document Number U0013400 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in Adobe Acrobat. Document Number U0013400 Contents DOE/Grand Junction Office Work Plan for Characterization Activities at Shiprock Project Site June 1998 Draft Final Page v Contents Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1.0 Introduction .

335

Mitigation Action Plan  

Broader source: Energy.gov (indexed) [DOE]

212 212 Mitigation Action Plan for the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory Departme~t of Energy Albuquerque Operations Office Los Alamos Area Office Los Alamos, New Mexico MITIGATION ACTION PLAN for the LEASE OF LAND FOR THE DEVELOPMENT OF A RESEARCH PARK AT LOS ALAMOS NATIONAL LABORATORY Background on the Lease of Land at Los Alamos National Laboratory: The U. S. Department of Energy (DOE) has approved an Environmental Assessment (EA) on the Lease of Land for the Development of a Research Park at Los Alamos National Laboratory (LANL)(DOE/EA-1212), Los Alamos, New Mexico. The DOE released a Predecisional Draft of this EA for State and Tribal review and made the draft document available to the public on July 24, 1997 for

336

Rail Planning Timeline  

Broader source: Energy.gov (indexed) [DOE]

Planning Timeline: By Responsible Party Planning Timeline: By Responsible Party Rev. 4.0, November 2006 Timeframe Offeror/Agent FRA Railroad(s) Other Post Shipment * DOE conducts Lessons Learned Review. During Shipment(s) * The offeror (shipper) will ensure that the appropriate FRA point of contact is notified of any changes 1 in the transportation schedule upon confirmation of the change (modification of SCOP OI-4). * DOE will notify the state Governors or designees and designated tribal points of contact by telephone in the event of schedule changes greater than six hours (DOE Manual 8.2.1). * In the event of a substantial unanticipated delay en route (e.g., greater than 2 hours), the affected states and tribes will be notified of the event by TRANSCOM. 2 TRANSCOM will notify the affected states and tribes

337

Workforce Diversity Action Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley National Laboratory is principally an institution of scientific research, committed to addressing the needs of society. A diverse workforce is an invaluable asset to innovation and research excellence. To this end, we must embody the following principles to successfully affect the Laboratory's mission and embrace our diverse workplace community. We affirm the inherent dignity in all of us and strive to maintain an environment characterized by respect, fairness, and inclusion. Our valued community encompasses an array of races, creeds, and social circumstances. We recognize and cherish the richness contributed by our diversity.

338

ESnet Planning, Status,  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ESnet Planning, Status, ESnet Planning, Status, and Future Issues William E. Johnston, ESnet Department Head and Senior Scientist Joe Burrescia, General Manager Mike Collins, Chin Guok, and Eli Dart, Engineering Brian Tierney, Advanced Development Jim Gagliardi, Operations and Deployment Stan Kluz, Infrastructure and ECS Mike Helm, Federated Trust Dan Peterson, Security Officer Gizella Kapus, Business Manager and the rest of the ESnet Team wej@es.net, this talk is available at www.es.net Energy Sciences Network Lawrence Berkeley National Laboratory Networking for the Future of Science ASCAC, August 2008 2 DOE Office of Science and ESnet - the ESnet Mission * ESnet is an Office of Science ("SC") facility in the Office of Advanced Scientific Computing Research ("ASCR")

339

SAVEnergy Action Plans  

SciTech Connect (OSTI)

The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

Mayo, K.; Westby, R. [National Renewable Energy Lab., Golden, CO (United States)] [National Renewable Energy Lab., Golden, CO (United States); deMonsabert, S. [George Mason Univ., Fairfax, VA (United States)] [George Mason Univ., Fairfax, VA (United States); Ginsberg, M. [USDOE, Washington, DC (United States)] [USDOE, Washington, DC (United States)

1994-04-01T23:59:59.000Z

340

Guam Energy Action Plan  

SciTech Connect (OSTI)

Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

Conrad, M. D.; Ness, J. E.

2013-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

National Infrastructure Protection Plan  

Broader source: Energy.gov (indexed) [DOE]

Infrastructure Infrastructure Protection Plan 2006 Preface Preface i The ability to protect the critical infrastructure and key resources (CI/KR) of the United States is vital to our national security, public health and safety, economic vitality, and way of life. U.S. policy focuses on the importance of enhancing CI/KR protection to ensure that essential governmental missions, public services, and economic functions are maintained in the event of a

342

Pretreatment Technology Plan  

SciTech Connect (OSTI)

This technology plan presents a strategy for the identification, evaluation, and development of technologies for the pretreatment of radioactive wastes stored in underground storage tanks at the Hanford Site. This strategy includes deployment of facilities and process development schedules to support the other program elements. This document also presents schedule information for alternative pretreatment systems: (1) the reference pretreatment technology development system, (2) an enhanced pretreatment technology development system, and (3) alternative pretreatment technology development systems.

Barker, S.A. [Westinghouse Hanford Co., Richland, WA (US); Thornhill, C.K.; Holton, L.K. Jr. [Pacific Northwest Lab., Richland, WA (US)

1993-03-01T23:59:59.000Z

343

Business plan proposal  

E-Print Network [OSTI]

about you and your business. The following guideline has been provided to ensure that important points are included in the executive summary. Your business may believe that other information may be pertinent to the completion of the agribusiness plan..., partnership, corporation), if it is a merchandising, processing, or service related business. Is it a new business? an expansion? or a relocation? If it is a relocation, where are you currently located? Trace the history of your business: when was it formed...

Kucera, Carolyn

1991-01-01T23:59:59.000Z

344

Mobile systems capability plan  

SciTech Connect (OSTI)

This plan was prepared to initiate contracting for and deployment of these mobile system services. 102,000 cubic meters of retrievable, contact-handled TRU waste are stored at many sites around the country. Also, an estimated 38,000 cubic meters of TRU waste will be generated in the course of waste inventory workoff and continuing DOE operations. All the defense TRU waste is destined for disposal in WIPP near Carlsbad NM. To ship TRU waste there, sites must first certify that the waste meets WIPP waste acceptance criteria. The waste must be characterized, and if not acceptable, subjected to additional processing, including repackaging. Most sites plan to use existing fixed facilities or open new ones between FY1997-2006 to perform these functions; small-quantity sites lack this capability. An alternative to fixed facilities is the use of mobile systems mounted in trailers or skids, and transported to sites. Mobile systems will be used for all characterization and certification at small sites; large sites can also use them. The Carlsbad Area Office plans to pursue a strategy of privatization of mobile system services, since this offers a number of advantages. To indicate the possible magnitude of the costs of deploying mobile systems, preliminary estimates of equipment, maintenance, and operating costs over a 10-year period were prepared and options for purchase, lease, and privatization through fixed-price contracts considered.

NONE

1996-09-01T23:59:59.000Z

345

TRUPACT-1 implementation plan  

SciTech Connect (OSTI)

TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

Hurley, J.D.; Tappen, J.J. (Westinghouse Electric Corp., Albuquerque, NM (United States). Joint Integration Office); Christensen, D.S. (USDOE Joint Integration Office, Albuquerque, NM (United States)) (eds.)

1985-09-01T23:59:59.000Z

346

Un~ted States Env~ronmental Monltor~ng EPA.600 '4-88, 021 Envtronmental Protect~on Systems Laboratory DOE/OP/00539/060  

Office of Legacy Management (LM)

Env~ronmental Monltor~ng EPA.600 '4-88, 021 Env~ronmental Monltor~ng EPA.600 '4-88, 021 Envtronmental Protect~on Systems Laboratory DOE/OP/00539/060 Agency P 0. Box 93478 June 1988 Las Vegas NV 89193-5478 Research and Development Off-Site Environmental Monitoring Report Radiation Monitoring Around United States 1 ' 7 L 8 f Nuclear Test Areas This page intentionally left blank EPA-60014-88-021 DOE/DPI0053?-060 May 1988 OFF-SITE ENVIRONMENTAL MONITORING REPORT R a d i a t i o n M o n i t o r i n g Around U n i t e d States Nuclear Test Areas, Calendar Year 1987 c o n t r i b u t o r s - C . A . Fontana, N . R . Sunderland S. C. Black, B. B. Dicey, A. N. J a r v i s D. D . Smith, D. J. Thorn6 A . A . Mullen, and Nuclear R a d i a t i o n Assessment D i v i s i o n prepared f o r t h e U.S. Department o f Energy under I n t e r a g e n c y Agreement Number DE-AI08-86NV10522

347

FY 2008 Control Table by Organization  

Office of Environmental Management (EM)

Congressional Approp. Request Request % FY 2008 vs. FY 2007 Naval Petroleum & Oil Shale Reserves Production operations......

348

PROJECT MANGEMENT PLAN EXAMPLES Project Management Plan Examples  

Broader source: Energy.gov (indexed) [DOE]

Management Plan Examples Management Plan Examples The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The elements table below should be used to navigate to the subject of interest. Elements of Deactivation Project Planning Deactivation Project Key Planning Elements Reference DOE O 430.1A Reference DOE G 430.1-3 DOE G 430.1- 3 Fig. 1 Link to Examples Policy & Operational Decisions, Assumptions and Strategies Includes organizational responsibilities and structure, disposition path, future use of facility, S&S Reqs and plan, hazard elimination or mitigation, NEPA, RCRA, CERCLA, HVAC/lighting service reqs, structural integrity reqs, etc. Sect. 6.e.7.a Sect. 4.1.1 Step 1 1. Example 1

349

PROJECT MANGEMENT PLAN EXAMPLES  

Broader source: Energy.gov (indexed) [DOE]

Prioritization of Facility Hazards Examples Prioritization of Facility Hazards Examples Example 20 7.7 PRELIMINARY HAZARD ANALYSIS Table 7-1 Preliminary Hazard Analysis (PHA) Overview for 779 Cluster's Decommissioning and Dismantlement Major Work Task Hazard Cause Preventive Measures Perform building walkdowns to identify Integrated Work Control Package (IWCP) work steps. Tripping, falling, exposure to chemicals, hazardous substances and / or radioactive materials. Also exposure to noise hazards. No planning, lack of communicating between work groups, improper use of Radiological Work Permits (RWPs), not following room or building instructions.  Develop Activity Hazard Analysis (AHA).  Conduct effective pre-evolution briefings.

350

TEPP Planning Brochure  

Broader source: Energy.gov (indexed) [DOE]

Following the completion of the assessment process Following the completion of the assessment process and the remedying of any identified improvement areas, a training tabletop drill or an exercise involving applicable emergency response organizations should be conducted. The drill or exercise will help to evaluate current emergency responder readiness. GUIDANCE FOR PLANNING, CONDUCTING AND EVALUATING TRANSPORTATION EXERCISES: This guide assists local, state, tribal and federal agencies in conducting tabletops, drills and exercises for transportation emergencies. Tabletops, drills and exercises facilitate a learning environment where response agencies can come together to understand and talk through an integrated response for a radiological transportation emergency. The accident scenarios provided with this manual may be modified to

351

Standard Review Plan  

Broader source: Energy.gov [DOE]

The Standard Review Plan (SRP) serves as the corporate framework designed to formalize the Department of Energy (DOE) and EM institutional processes and requirements associated with the review of project activities in support of CD approvals. The SRP has been developed as a collaborative effort between EM and the Chief of Nuclear Safety (CNS), Office of the Under Secretary. It is modeled after similar principles used extensively and successfully by the Nuclear Regulatory Commission (NRC) for evaluating U.S. commercial nuclear industry licensed activities.

352

Transportation Business Plan  

SciTech Connect (OSTI)

The Transportation Business Plan is a step in the process of procuring the transportation system. It sets the context for business strategy decisions by providing pertinent background information, describing the legislation and policies governing transportation under the NWPA, and describing requirements of the transportation system. Included in the document are strategies for procuring shipping casks and transportation support services. In the spirit of the NWPA directive to utilize the private sector to the maximum extent possible, opportunities for business ventures are obvious throughout the system development cycle.

Not Available

1986-01-01T23:59:59.000Z

353

Datasheet Fujitsu EsPRiMO P9900 E-staR 5.0 DEsktOP PC Page 1 / 7 http://ts.fujitsu.com/esPRIMO  

E-Print Network [OSTI]

://ts.fujitsu.com/esPRIMO Datasheet Fujitsu EsPRiMO P9900 E-staR 5.0 DEsktOP PC thE ExPanDablE businEss wORkhORsE HALOGEN FREE QUIET with turbo boost and hyperthreading, is the ideal companion for all those highly demanding business of performance state-of-the-art intel ® CoreTM processors with turbo boost and hyperthreading technology

Fiebig, Peter

354

HIPAA NOTICE OF PRIVACY PRACTICES HEALTH CARE SERVICE CORPORATION HEALTH PLAN ("Health Plan")  

E-Print Network [OSTI]

TO THIS INFORMATION. PLEASE REVIEW IT CAREFULLY. The Health Plan and the Flex Plan (collectively, the "Plans1 HIPAA NOTICE OF PRIVACY PRACTICES HEALTH CARE SERVICE CORPORATION HEALTH PLAN ("Health Plan") & HEALTH CARE SERVICE CORPORATION MASTER FLEXIBLE BENEFIT PLAN ("Flex Plan") EFFECTIVE APRIL 14, 2003

Shahriar, Selim

355

Human Factors Review Plan  

SciTech Connect (OSTI)

''Human Factors'' is concerned with the incorporation of human user considerations into a system in order to maximize human reliability and reduce errors. This Review Plan is intended to assist in the assessment of human factors conditions in existing DOE facilities. In addition to specifying assessment methodologies, the plan describes techniques for improving conditions which are found to not adequately support reliable human performance. The following topics are addressed: (1) selection of areas for review describes techniques for needs assessment to assist in selecting and prioritizing areas for review; (2) human factors engineering review is concerned with optimizing the interfaces between people and equipment and people and their work environment; (3) procedures review evaluates completeness and accuracy of procedures, as well as their usability and management; (4) organizational interface review is concerned with communication and coordination between all levels of an organization; and (5) training review evaluates training program criteria such as those involving: trainee selection, qualification of training staff, content and conduct of training, requalification training, and program management.

Paramore, B.; Peterson, L.R. (eds.)

1985-12-01T23:59:59.000Z

356

Planning Team | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Planning Team Planning Team Planning Team October 16, 2013 - 5:11pm Addthis Photo of three men standing together reviewing a large print document. The men have bright orange and yellow construction vests and hard hats. A data center manager reviews blueprints with an IT project manager and data center coordinator during construction of a Federal facility. Planning is the time to bring renewable energy expertise to the table, including a strong renewable energy planning team that will be part of the project though completion. It is important to have a team in place with the skills required to advocate for renewable energy and the agency's best interests throughout the project. The planning team set the goals and objectives for the project as well as criteria for design team selection and should be convened at the outset of

357

Open Government Plan Self Evaluation  

Broader source: Energy.gov (indexed) [DOE]

Government Plan Self Evaluation Government Plan Self Evaluation Page 1 of 3 NAME OF AGENCY: Department of Energy NAME OF EVALUATOR: TheAnne Gordon DIRECTIONS The enclosed list of 30 criteria is drawn directly from the text of the Open Government Directive. Please return this form to the White House Open Government team at opengov@ostp.gov by 5 pm on Friday, April 23 rd . To complete the self- evaluation form, please indicate a response to each of the criteria as follows: Red (R) - plan does not satisfy the requirement Yellow (Y) - plan partially satisfies the requirement Green (G) - plan fully satisfies the requirement N/A - not applicable because agency does not engage in that activity or area Please include any explanatory comments on the last page. Optional: If you wish, please provide the page range for the relevant section of the plan that is the basis for your

358

Electric utility system master plan  

SciTech Connect (OSTI)

This publication contains the electric utility system plan and guidelines for providing adequate electric power to the various facilities of Lawrence Livermore National Laboratory in support of the mission of the Laboratory. The topics of the publication include general information on the current systems and their operation, a planning analysis for current and future growth in energy demand, proposed improvements and expansions required to meet long range site development and the site`s five-year plan.

Erickson, O.M.

1992-10-01T23:59:59.000Z

359

Regional Planning | Data.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Regional Planning Regional Planning Ocean Data Tools Technical Guide Map Gallery Regional Planning Feedback Ocean You are here Data.gov » Communities » Ocean Regional Planning Efforts Alias (field_alias) Apply California, Oregon, Washington Regional Ocean Partnership West Coast Governors' Alliance Regional Data Portal In Development U.S. Virgin Islands, Puerto Rico Regional Ocean Partnership U.S. Caribbean Regional Ocean Partnership-currently being formally established Regional Data Portal To be developed Georgia, Florida, North Carolina, South Carolina Regional Ocean Partnership Governors' South Atlantic Alliance Regional Data Portal Currently in development American Samoa, Commonwealth of the Northern Mariana Islands (CNMI), Federated States of Micronesia, Guam, Hawaii, Marshall Islands, Palau

360

ORISE: Operations Support and Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Securing the Golden State Amber Waves 2012 Bureau of Reclamation Emergency Management Issues Special Interest Group Golden Guardian Joint Information Center Preventing Nuclear Smuggling Program Training and Technology Support Resources How to Work With Us Contact Us Oak Ridge Institute for Science Education Operations Support and Planning Operations Support and Planning The Oak Ridge Institute for Science and Education (ORISE) provides operations and planning support to the U.S. Department of Energy (DOE), Federal Emergency Management Agency and other government agencies for their counterterrorism and emergency response readiness programs. ORISE's planning, logistical and administrative support areas are focused on enhancing the radiological preparedness and response coordination

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Fermilab | Directorate | Program Planning Office  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Program Planning Office Program Planning Office Steve Geer, Head The Program Planning Office within the Fermilab Directorate coordinates the experimental physics program carried out at the Laboratory. The office provides a link between ongoing and planned experiments and the Directorate, by: Acting as liaison between experimenters and laboratory staff regarding beam conditions during accelerator operation. Establishing priorities between accelerator studies and experiments and among experiments, in consultation with the Director, and resolving conflicting requests from experiments. Coordinating Division and Section reviews of draft Memoranda of Understanding for approved experiments. Coordinating updates to the "Procedures for Researchers" which provides a guide for researchers using Fermilab facilities.

362

National Grid Energy Efficiency Plans  

Broader source: Energy.gov [DOE]

Presentation covers the National Grid Energy Efficiency plans and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

363

Conversion Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

document the conversion plan that clearly defines the system or project's conversion procedures; outlines the installation of new and converted filesdatabases; coordinates the...

364

Annual Operating Plan: FY 1991  

SciTech Connect (OSTI)

This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form.

None

1991-06-05T23:59:59.000Z

365

Final Draft Strategic Marketing Plan.  

SciTech Connect (OSTI)

The Bonneville Power Administration (BPA) has developed a marketing plan to define how BPA can be viable and competitive in the future, a result important to BPA`s customers and constituents. The Marketing Plan represents the preferred customer outcomes, marketplace achievements, and competitive advantage required to accomplish the Vision and the Strategic Business Objectives of the agency. The Marketing Plan contributes to successful implementation of BPA`s Strategic Business Objectives (SBOs) by providing common guidance to organizations and activities throughout the agency responsible for (1) planning, constructing, operating, and maintaining the Federal Columbia River Power System; (2) conducting business with BPA`s customers; and (3) providing required internal support services.

United States. Bonneville Power Administration.

1994-02-01T23:59:59.000Z

366

Health & Safety Plan Last Updated  

E-Print Network [OSTI]

Health & Safety Plan Last Updated March 2008 1 #12;A. SCOPE AND RESPONSIBILITY....................................................................................................................................... 3 2. Safety and Health Policy...................................................................................................................... 3 4. Safety Coordinator

Anderson, Richard

367

Emergency Readiness Assurance Plans (ERAPs)  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This volume describes the assessments and documentation that would ensure that stated response capabilities are sufficient to implement emergency plans. Canceled by DOE G 151.1-3.

1997-08-21T23:59:59.000Z

368

ARM - Lesson Plans: Global Warming  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plans: Global Warming Objective The objective is to understand the enhanced greenhouse effect and the effects of global warming. Important Points to Understand If the...

369

Sample Lesson Plan Safety and Health Programs 1 Lesson Plan  

E-Print Network [OSTI]

culture that reduces accidents for workers and improves the bottom line for managers. When safetySample Lesson Plan ­ Safety and Health Programs 1 Lesson Plan General Industry Outreach Training Program (10-hour) Topic: Safety and Health Programs Overview Effective management of worker safety

Homes, Christopher C.

370

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL  

Office of Legacy Management (LM)

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community Improvement Corporation 720 Mound Road Miamisburg, Ohio 45342-6714 Dear Mr. Bird: The Core Team, consisting of the U.S. Department of Energy Miamisburg Environmental Management Project (DOE-MEMP), U.S. Environmental Protection Agency (USEPA), and the Ohio Environmental Protection Agency (OEPA), appreciates your comments on the Work

371

PROJECT MANGEMENT PLAN EXAMPLES  

Broader source: Energy.gov (indexed) [DOE]

Development of Detailed End Points - Development of Detailed End Points - End Point Document Examples Example 28 7.0 ENDPOINTS Chapter 7.0 describes the endpoint development principles and methodology, administration, closure, and turnover package for the 324 and 327 Buildings Stabilization/Deactivation Project. 7.1 Background The endpoint method for the 324 and 327 Buildings Stabilization/Deactivation Project will follow the EM-60 guidance, published in DOE/EM-0318, Rev. 0, U.S. Department of Energy, Office of Environmental Management Facility Deactivation, Methods and Practice Handbook, Emphasizing End Points (sic) Implementation . The methods of defining endpoints for facility stabilization and deactivation were proven extremely effective at the PUREX and B-Plant facilities for planning work and interacting with the

372

TECHNOLOGY PROGRAM PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

COMBUSTION SYSTEMS COMBUSTION SYSTEMS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any

373

2007 Strategic Plan  

Broader source: Energy.gov (indexed) [DOE]

U.S. Department of Energy Office of Legacy Management Office of Legacy Management Strategic Plan O r g a n i z a t i o n O r g a n i z a t i o n A H i g h Perfo r m i n g A H i g h Perfo r m i n g HPO Managing Today's Change, Protecting Tomorrow's Future Managing Today's Change, Protecting Tomorrow's Future DOE/LM-1458 Cover, left to right, top to bottom: The Environmental Justice program affords learning opportunities for interns at an U.S. Department of Energy national laboratory. A records storage facility at the Mound, Ohio, site. A c The Weldon Spring, Missouri, Site disposal cell shown with its prairie in bloom. Tours of the disposal cell and Interpretive Center are available for school children and other groups. Environmental Sciences Laboratory personnel conduct projects in applied science that help ensure that Legacy Management remediation

374

TECHNOLOGY PROGRAM PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SOLID OXIDE FUEL CELLS SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any

375

2004 Strategic Plan  

Broader source: Energy.gov (indexed) [DOE]

Legacy Management Legacy Management STRATEGIC PLAN "Managing Today's Change, Protecting Tomorrow's Future" July 2004 ii July 2004 Executive Summary Activities of the U.S. Department of Energy (the Department) and predecessor agencies, particularly during the Cold War, have left a legacy of environmental impact at over 100 sites. Workers associated with these historical and current activities number in the hundreds of thousands. Addressing this environmental and human legacy has been, and will continue to be, a major Departmental undertaking. On December 15, 2003, the Department took a significant step toward managing post-closure activities so as to ensure the future protection of human health and the environment by creating the Office of

376

Hazmat Team Planning Guide  

Broader source: Energy.gov (indexed) [DOE]

EPA 540/G-90/003 EPA 540/G-90/003 Directive: 9285.3-05 September 1990 Hazmat Team Planning Guidance Office of Emergency and Remedial Response U.S. Environmental Protection Agency Washington, DC 20460 NOTICE The policies and procedures set forth in this document are intended solely to provide guidance. This guidance does not constitute rulemaking by the U.S. Environmental Protection Agency (EPA), and may not be relied on to create a substantive or procedural right enforceable by any party in litigation with the United States. EPA may take action that is at variance with the policies and procedures in these guidelines and may change them at any time without public notice. The mention of trade names or commercial products in this manual is for illustration purposes and does not constitute endorsement or recommendation for use by EPA. Cost

377

TECHNOLOGY PROGRAM PLAN  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SEPTEMBER 2013 SEPTEMBER 2013 CARBON STORAGE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any

378

ARM Science Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ER-ARM-0402 ER-ARM-0402 Atmospheric Radiation Measurement Program Science Plan Current Status and Future Directions of the ARM Science Program Thomas P. Ackerman, Lead Author Anthony D. Del Genio Gregory M. McFarquhar Robert G. Ellingson Peter J. Lamb Richard A. Ferrare Charles N. Long Steve A. Klein Johannes Verlinde October 2004 United States Department of Energy Office of Science, Office of Biological and Environmental Research Executive Summary The Atmospheric Radiation Measurement (ARM) Program has matured into one of the key programs in the U.S. Climate Change Science Program. The ARM Program has achieved considerable scientific success in a broad range of activities, including site and instrument development, atmospheric radiative

379

GEND planning report  

SciTech Connect (OSTI)

The Three Mile Island (TMI) Unit 2 accident on March 28, 1979 was and is of great concern to the nuclear industry; electric power generating companies and their customers, regulatory and other government agencies, the entire nuclear community, and to the country as a whole. While the accident resulted in only limited external plant radiation exposure, the plant itself suffered extensive damage with high radiation contamination within the reactor and auxiliary system facilities. The GEND Planning Report for cleanup activities at TMI-2 covers the areas of: instrumentation and electrical equipment survivability; fission product transport; decontamination/radiation dose reduction technology; data bank organization and sample archive facility; characterization of primary system pressure boundary and mechanical components; core damage assessment; and fuel handling, removal, examination and disposal.

None

1980-10-01T23:59:59.000Z

380

Planning Tool for Strategic Evaluation of Facility Plans - 13570  

SciTech Connect (OSTI)

Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

Magoulas, Virginia; Cercy, Michael [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States)] [Savannah River National Laboratory, Savannah River Site, Aiken, SC 29808 (United States); Hall, Irin [Newport News Shipbuilding, 4101 Washington Ave., Newport News, VA 23607 (United States)] [Newport News Shipbuilding, 4101 Washington Ave., Newport News, VA 23607 (United States)

2013-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

FTCP Plans & Reports | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Plans & Reports Plans & Reports FTCP Plans & Reports Biennial Report FTCP Biennial Report - Calendar Years 2011-2012 FTCP Biennial Report - Calendar Years 2009-2010 Annual Reports FTCP Annual Report - Calendar Year 2008 FTCP Annual Report - Calendar Year 2007 FTCP Annual Report - Fiscal Year 2004 FTCP Annual Report - Fiscal Year 2002 Status Report FTCP Senior Technical Safety Manager (STSM) Status Report Annual Plans FTCP Annual Plan - Fiscal Year 2005 FTCP Annual Plan - Fiscal Year 2004 FTCP Annual Plan - Fiscal Year 2003 FTCP Annual Plan - Fiscal Year 2002 Operational Plans FTCP Operational Plan and Closeout Summary, Fiscal Year 2012 FTCP Operational Plan and Closeout Summary, Fiscal Year 2011 FTCP OPERATIONAL PLAN and Summary, FISCAL YEAR 2010 FTCP OPERATIONAL PLAN and Closeout Summary, FISCAL YEAR 2009

382

Planning, Budget, and Acquisition | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Planning, Budget, and Acquisition Planning, Budget, and Acquisition Planning, Budget, and Acquisition The Office of Legacy Management's (LM) Planning, Budget, and Acquisition (PBA) Team performs the following management functions: Plans, develops, and implements improvements in efficiencies of business processes and identifies opportunities for reengineering or restructuring. Plans, develops, and implements strategic planning efforts, which include analyzing the organization's annual and long-term goals and the best approach for achieving those goals. Plans, develops, and implements budget formulation processes to include identifying future spending priorities and assessing the effectiveness of programs. Plans, develops, and implements processes for budget execution, including day-to-day obligations for agency expenditures, invoices, billing

383

Topic A Awardee: Eastern Interconnection Planning Collaborative |  

Broader source: Energy.gov (indexed) [DOE]

A Awardee: Eastern Interconnection Planning A Awardee: Eastern Interconnection Planning Collaborative Topic A Awardee: Eastern Interconnection Planning Collaborative Eastern Interconnection Planning Collaborative The Eastern Interconnection Planning Collaborative (EIPC) was initiated by a coalition of regional Planning Authorities. These Planning Authorities are entities listed on the NERC compliance registry as Planning Authorities and represent the entire Eastern Interconnection. The EIPC was founded to be a broad-based, transparent collaborative process among all interested stakeholders: State and Federal policy makers Consumer and environmental interests Transmission Planning Authorities Market participants generating, transmitting or consuming electricity within the Eastern Interconnection. The EIPC will provide a grass-roots approach which builds upon the regional

384

Procedure for Planning and Conducting  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lift Plan Procedure Lift Plan Procedure Stanford Synchrotron Radiation Laboratory Lead Author __________________________________ Date 07/13/2005___________ David A. Ernst Mechanical Service Group Approvals: __________________ Date _____________________ Matt Padilla SSRL Safety Officer __________________ Date _____________________ Robert Hettel Accelerator System Department Head __________________ Date _____________________ Piero Pianetta Beam Line System Department Head Hoist and Rigging Panel Member _______________________________________ Date ______________________

385

What Is the Plan Commission  

E-Print Network [OSTI]

What Is the Plan Commission & How Does It Work? Purdue University Cooperative Extension Service valuable to the community and to its elected and appointed officials. Plans and proposals from individuals- nance, and a subdivision ordinance. They also make recommendations to elected officials on proposed

386

STRATEGIC PLAN August 19, 2011  

E-Print Network [OSTI]

Planning Team Members 27 #12;SEAS STRATEGIC PLAN 2 | P a g e INTRODUCTION SEAS History The School of Engineering and Applied Science at the University of Virginia got its start as the School of Civil Engineering in 1836. It was the first engineering school in the South and the fourth university-level engineering

Acton, Scott

387

Climate Change Proposed Scoping Plan  

E-Print Network [OSTI]

Climate Change Proposed Scoping Plan a amework for change Prepared by the California Air Resources #12;CLIMATE CHANGE SCOPING PLAN State of California Air Resources Board Resolution 08-47 December 11 greenhouse gas (GHG) emissions that cause global warming; WHEREAS, the adverse impacts of climate change

388

Business Plan Development Company Description  

E-Print Network [OSTI]

by the establishment of additional work stations. Raw materials purchasing and subsequent manufacturing need to be done purchasing and manufacturing under my personal name to-date. The concept of the device I patented market, marketing plan, web development, manufacturing plan to allow for maximum profit margin while

Dahl, David B.

389

TGS plans return to Mexico  

Science Journals Connector (OSTI)

TGS plans return to Mexico ... Hardly a day goes by without a new development relating to mining sulfur in Mexico (C&EN, Oct. 24, page 28), with the latest move being Texas Gulf Sulphurs plans to form a company with the Mexican government to explore for sulfur in that country. ...

1966-10-31T23:59:59.000Z

390

Natural Resource Management Plan Update  

E-Print Network [OSTI]

Natural Resource Management Plan Update Tim Green Environmental Protection Division Community. Cultural Resources) · Focus on gaining better understanding of site resources · Began or continued managing · Monitoring layers · Cultural Resources ­ WW I, WW II, CCC GIS used for planning ­ NSLS II, LISF, Permits, etc

Homes, Christopher C.

391

BIOMASS ACTION PLAN FOR SCOTLAND  

E-Print Network [OSTI]

BIOMASS ACTION PLAN FOR SCOTLAND #12; #12;© Crown copyright 2007 ISBN: 978 0 7559 6506 9 Scottish% recyclable. #12;A BIOMASS ACTION PLAN FOR SCOTLAND #12;#12;1 CONTENTS FOREWORD 3 1. EXECUTIVE SUMMARY 5 2. INTRODUCTION 9 3. WIDER CONTEXT 13 4. SCOTLAND'S ROLE IN THE UK BIOMASS STRATEGY 17 5. BIOMASS HEATING 23 6

392

COMMISSION REPORT 20122013 INVESTMENT PLAN  

E-Print Network [OSTI]

COMMISSION REPORT 20122013 INVESTMENT PLAN UPDATE FOR THE ALTERNATIVE AND RENEWABLE FUEL, and diesel substitute fuels. State investment is necessary to fill the gap and fund the differential cost the Energy Commission to adopt an investment plan that describes how funding will complement existing public

393

TECHNOLOGY MASTER PLAN 2013 2015  

E-Print Network [OSTI]

TECHNOLOGY MASTER PLAN 2013 ­ 2015 Endorsed by Academic Senate On October 25, 2013 & College Council On November 8, 2013 #12;Information Technology Strategic Plan 2013-2015 Prepared by Willie Pritchard & Gene Spencer, Higher Education Technology Consultants on behalf of the many participants

394

NUCLEAR ENGINEERING Four Year Plan  

E-Print Network [OSTI]

NUCLEAR ENGINEERING Four Year Plan Fall 2009 Nuclear Engineering (67 hrs) CH Grade Perspectives (15;Nuclear Engineering Four Year Plan Starting Fall 2009 FALL Year 1 Credits WINTER Year 1 Credits SPRING I NE 452 3 Neutronic Analysis II NE 457 2 Nuclear Reactor Lab Western Culture (3): NE 467 4 Nucl

Tullos, Desiree

395

Exposure Control Plan Bloodborne Pathogen Program  

E-Print Network [OSTI]

) will review and revise the Plan annually in accordance with the current OSHA BBP Standard. 2. OCCUPATIONAL. The Standard requires employers to develop and implement a written Exposure Control Plan (the "Plan"). The Plan provisions of the Standard. The Exposure Control Plan is contained in the Laboratory Safety Manual

Natelson, Douglas

396

Public Involvment Plan - Rifle, Colorado  

Office of Legacy Management (LM)

4-TAR 4-TAR MAC-GWRIF 7.1 UMTRA Ground Water Project Public Involvement Plan for the Environmental Assessment of Ground Water Compliance at the New and Old Rifle, Colorado, Uranium Mill Tailings Sites May 1999 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work performed under DOE Contract No. DE-AC13-96GJ87335 Public Involvement Plan for the Rifle UMTRA Sites Page 2 Introduction This Public Involvement Plan is tiered to the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project Public Participation Plan dated October 1997. This Public Involvement Plan applies to both the Old and New Rifle, Colorado, UMTRA Project sites and details the activities that have been or will be carried out to meet the public participation requirements of the

397

Technical planning activity: Final report  

SciTech Connect (OSTI)

In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

Not Available

1987-01-01T23:59:59.000Z

398

CAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS  

E-Print Network [OSTI]

CAMPUS PLANNING COMMITTEE PLANNING AND REVIEW PROCESS FOR MAJOR CAPITAL PROJECTS (Revised June 2011) ___________________________________________________________________________________________ I. INTRODUCTION An effective major capital planning and review process will: Encourage appropriate planning objectives of the campus are appropriately coordinated and facilitate the successful

California at Santa Barbara, University of

399

CESP Tool 9.1: Monitoring Plan Template  

Broader source: Energy.gov [DOE]

CESP Tool 9.1: Monitoring Plan Template from Step 9: Plan to Elevate, Guide to Community Energy Strategic Planning.

400

Externaliteiten van Landmarks op woningwaardes:.  

E-Print Network [OSTI]

??De term Landmark is een veelgebruikt begrip in de stedenbouw. Enkele bekende voorbeelden zijn de Eilffeltoren, Petronas twin-towers en het Opera House in Sydney. In (more)

Thijs, M.L.

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

OPS Application Requisition #: Job Title  

E-Print Network [OSTI]

to my application and resume. I certify that the application and/or resume submitted are a complete statements or omissions made by me on this form, my application, my resume, or any supplementary

Mazzotti, Frank

402

LM Annual NEPA Planning Summary 2014 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Annual NEPA Planning Summary 2014 LM Annual NEPA Planning Summary 2014 LM Annual NEPA Planning Summary 2014 LM Annual NEPA Planning Summary 2014 More Documents & Publications 2010...

403

Software Quality Assurance Plan Example | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Assurance Plan Example Software Quality Assurance Plan Example An example of a software quality assurance plan developed from an actual DOE project SQA plan based on DOE G...

404

Hydrogen Posture Plan: An Integrated Research, Development and...  

Broader source: Energy.gov (indexed) [DOE]

Posture Plan: An Integrated Research, Development and Demonstration Plan Hydrogen Posture Plan: An Integrated Research, Development and Demonstration Plan The 2006 Hydrogen Posture...

405

Site Sustainability Plan (SSP) 2013 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Sustainability Plan (SSP) 2013 Site Sustainability Plan (SSP) 2013 Site Sustainability Plan (SSP) 2013 2013 Site Sustainability Plan More Documents & Publications Site...

406

Site Sustainability Plan (SSP) 2010 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0 Site Sustainability Plan (SSP) 2010 Site Sustainability Plan (SSP) 2010 2010 More Documents & Publications Site Sustainability Plan (SSP) 2012 Site Sustainability Plan (SSP) 2013...

407

Site Sustainability Plan (SSP) 2012 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2 Site Sustainability Plan (SSP) 2012 Site Sustainability Plan (SSP) 2012 2012 More Documents & Publications Site Sustainability Plan (SSP) 2013 2014 Site Sustainability Plan Site...

408

New Mexico State University Dining Services Master PlanDining Services Master Plan  

E-Print Network [OSTI]

within a framework of financial self- sustainment. The Dining Services Master Plan is founded with other strategic planning initiatives such as the Campus Master Plan, Housing Master Plan and Corbett program, and an evaluation of the impact of the Campus Master Plan, Housing Master Plan and Corbett Center

Nishiguchi, Michele

409

Health Plans | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Health Plans Health Plans Health Plans A side-by side benefit comparison for medical, vision, and prescription drugs is provided here for your information. A similar comparison is provided for the two dental plans. The plans are available to employees and pre-65 retirees. As required under health care reform, employer group health plans must complete a Summary of Benefits and Coverage (SBC) document for each medical plan offered in 2014. The SBC must be provided to plan participants. This requirement applies even if the plan benefits are not changing. The Y-12 health plans impacted by the 2014 health reform notice requirements are the medical and prescription drug benefit plans. If the medical and prescription benefits are not changing, then they are referred to as "grandfathered" plans, and participants must be told the benefits

410

Annual Planning Summaries: 2013 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3 3 Annual Planning Summaries: 2013 March 25, 2013 2013 Annual Planning Summary for the Argonne Site Office 2013 Annual Planning Summary for the Argonne Site Office March 25, 2013 2013 Annual Planning Summary for the Argonne Site Office 2013 Annual Planning Summary for the Argonne Site Office January 30, 2013 2013 Annual Planning Summary for the Carlsbad Field Office 2013 Annual Planning Summary for the Carlsbad Field Office January 30, 2013 2013 Annual Planning Summary for the Oak Ridge Office 2013 Annual Planning Summary for the Oak Ridge Office January 30, 2013 2013 Annual Planning Summary for the Western Area Power Administration 2013 Annual Planning Summary for the Western Area Power Administration January 29, 2013 2013 Annual Planning Summary for the Idaho Operations Office

411

Guide to Workforce Planning Dec 8  

Broader source: Energy.gov (indexed) [DOE]

GUIDE TO WORKFORCE PLANNING GUIDE TO WORKFORCE PLANNING at the Department of Energy Forecasting our future demands to getting the right people; with the right skills; in the right place at the right time September 2005 Human Capital Management Strategic Planning and Vision ii GUIDE TO WORKFORCE PLANNING iii CONTENTS Introduction 1 Executive Summary 2 Why undertake workforce planning? 2 What is workforce planning? 2 Diagram of a workforce planning system 3 Main drivers for workforce planning 4 Benefits of workforce planning 4 Timescales and scope 5 Five Phases for Workforce Planning Phase 1-Analyzing 6 Phase 2-Forecasting 7 Phase 3-Planning 9 Phase 4-Implementing 10 Phase 5-Evaluating 10 Tables Table 1 - SWOT 11 Table 2 PEST/LE 11 1 WORKFORCE PLANNING GUIDE

412

Workforce Management Office WORKFORCE AND SUCCESSION PLANNING  

E-Print Network [OSTI]

2012 Workforce Management Office NOAA 1/1/2012 WORKFORCE AND SUCCESSION PLANNING Toolkit to Identify and Address Strategic Talent Gaps #12;Workforce & Succession Planning Toolkit NOAA Workforce .......................................................................................................3 Workforce Planning

413

Plans, Implementation, and Results | Department of Energy  

Energy Savers [EERE]

Implementaton WIPO Goals and Metrics Inter-Tribal Energy Network and DOE Strategic Planning Session Report Multiyear Program Plans Proposed FY 2008-2012 Five-Year Plan Back...

414

NASA's Metering Plan | Department of Energy  

Energy Savers [EERE]

NASA's Metering Plan NASA's Metering Plan Presentation covers NASA's Meterting Plan and is given at the FUPWG 2006 Spring meeting, held on May 3-4, 2006 in Atlanta, Georgia....

415

RAP Committee 3-Month Work Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(where does this fit into the HAB FY2014 Work Plan?) Update on 100-N RIFS and Proposed Plan Rev 0; advice development o Review of recommendations of proposed plans o Draft A ...

416

Planning for an Energy Management System  

Broader source: Energy.gov [DOE]

This presentation discusses the Planning step as part of an Energy Management System. Planning involves establishing your energy picture, defining the scope and boundary, setting an energy baseline, and developing action plans.

417

Work Plans & Manuals | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Work Plans & Manuals Work Plans & Manuals This list contains audit and inspections manuals and a list of planned reviews to be conducted by the Office of Audits and Inspections....

418

UCSF Sustainability Action Plan: Executive Summary  

E-Print Network [OSTI]

UCSF Sustainability Action Plan: Executive Summary Issue Date: April 21, 2011 #12;UCSF Sustainability Action Plan Executive Summary April 21, 2011 Page 1 Table of Contents An Introduction to the Sustainability Action Plan

Yamamoto, Keith

419

Cerda and Barcelona : research and plan  

E-Print Network [OSTI]

The Industrial Revolution had a huge impact on nineteenth century cities had plans to expand the "old city". Due to its historical controversy a plans developed during that time was the Eixample plan in Barcelona. The ...

Alonso Fernndez, Valeria, 1977-

2008-01-01T23:59:59.000Z

420

First mideast capacity planned  

SciTech Connect (OSTI)

Kuwait catalyst Co.`s (KCC) plans to build a hydrodesulfurization (HDS) catalysts plant in Kuwait will mark the startup of the first refining catalysts production in the Persian Gulf region. KCC, owned by a conglomerate of Kuwait companies and governmental agencies, has licensed catalyst manufacturing technology from Japan Energy in a deal estimated at more than 7 billion ($62 million). Plant design will be based on technology from Orient Catalyst, Japan Energy`s catalysts division. Construction is expected to begin in January 1997 for production startup by January 1998. A source close to the deal says the new plant will eventually reach a capacity of 5,000 m.t./year of HDS catalysts to supply most of Kuwait`s estimated 3,500-m.t./year demand, driven primarily by Kuwait National Petroleum refineries. KCC also expects to supply demand from other catalyst consumers in the region. Alumina supply will be acquired on the open market. KCC will take all production from the plant and will be responsible for marketing.

Fattah, H.

1996-11-06T23:59:59.000Z

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Draft Mission Plan Amendment  

SciTech Connect (OSTI)

The Department of Energy`s Office Civilian Radioactive Waste Management has prepared this document to report plans for the Civilian Radioactive Waste Management Program, whose mission is to manage and dispose of the nation`s spent fuel and high-level radioactive waste in a manner that protects the health and safety of the public and of workers and the quality of the environment. The Congress established this program through the Nuclear Waste Policy Act of 1982. Specifically, the Congress directed us to isolate these wastes in geologic repositories constructed in suitable rock formations deep beneath the surface of the earth. In the Nuclear Waste Policy Amendments Act of 1987, the Congress mandated that only one repository was to be developed at present and that only the Yucca Mountain candidate site in Nevada was to be characterized at this time. The Amendments Act also authorized the construction of a facility for monitored retrievable storage (MRS) and established the Office of the Nuclear Waste Negotiator and the Nuclear Waste Technical Review Board. After a reassessment in 1989, the Secretary of Energy restructured the program, focusing the repository effort scientific evaluations of the Yucca Mountain candidate site, deciding to proceed with the development of an MRS facility, and strengthening the management of the program. 48 refs., 32 figs.

NONE

1991-09-01T23:59:59.000Z

422

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Broader source: Energy.gov (indexed) [DOE]

H&S Plan Examples H&S Plan Examples Example 46 9.2 HEALTH AND SAFETY STRATEGY B Plant has integrated safety into its management, planning and work practices in order to protect the public, the environment and facility workers against nuclear and non-nuclear hazards associated with facility transition. Based upon the principles of DNFSB Recommendation 95-2, the Plant's approach to safety management includes:  Applicable. standards and requirements specifically identified and implemented  Safety integrated into baseline and detailed planning  Workers and trained safety professionals use a team approach in hazard identification, analysis and control  Graded approach used to tailor controls based upon hazard type and severity  Hazard control integrated into work processes

423

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Broader source: Energy.gov (indexed) [DOE]

System Closure Plan Examples System Closure Plan Examples Example 61 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field representative will verify acceptable completion of the applicable activity. Verification may be performed by reviewing documents, letters, photos, work packages, or work plans, or by visual inspection. When all the endpoints for a specific area of the building have been completed and verified, designated BWHC and BHI management will sign for completion and acceptance of that

424

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Broader source: Energy.gov (indexed) [DOE]

S&M Plan Examples S&M Plan Examples Example 44 5.0 SURVEILLANCE AND MAINTENANCE 5.01 Current S&M Requirements Currently, the heavy water facility is performing operational maintenance and surveillances as dictated by outside and inside facility operating rounds, facility operating procedures, facility maintenance procedures, facility alarm response procedures, and any additional surveillance and maintenance required by SFSD and SRS administrative programs and policies. As the facility progresses through deactivation, the operational S&M requirements will be retired. 5.02 Post Deactivation S&M Plan (Summary) An S&M plan, required by Ref. 1, will be developed and approved following deactivation of the 400-D excess facilities. Three types of S&M activities are envisioned. On a monthly basis, the outside of the excess facilities will be inspected for safety, security, and

425

Family Emergency Preparedness Plan 1 Family Emergency Preparedness Plan  

E-Print Network [OSTI]

........................................................................................10 Utilities services and government agencies may not be able to respond to your needs immediately. Their buildings to plan to be on our own for a minimum of three days. While we cannot stop these disasters from occurring

Noble, James S.

426

Biomedical Engineering Program Assessment Plan Biomedical Engineering Program Assessment Plan  

E-Print Network [OSTI]

1 Biomedical Engineering Program Assessment Plan Biomedical Engineering Program in science and mathematics to address engineering problems in a biomedical context. a. Demonstrate a working sciences. b. Demonstrate ability to apply basic science concepts as foundations to biomedical engineering

Cantlon, Jessica F.

427

DOE Emergency Public Affairs Plan  

Broader source: Energy.gov (indexed) [DOE]

Headquarters Headquarters Office of Public Affairs Emergency Public Affairs Plan The DOE HQ Office of Public Affairs Emergency Public Affairs Plan has been approved for implementation by: __________________________________________________________ Dan Leistikow, Director, HQ Office of Public Affairs Date: ______________ __________________________________________________________ Joseph Krol, Director, HQ Office of Emergency Management Date: ______________ DOE Office of Public Affairs Emergency Public Affairs Plan 1 Purpose The Department of Energy (DOE) HQ Office of Public Affairs (PA) is committed to communicating information about the Department's work in a timely, accurate and accessible way to the news media, general public and employees.

428

2010 Annual Plan | Department of Energy  

Office of Environmental Management (EM)

2010 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2009 Annual Plan Ultra-Deepwater and...

429

2009 Annual Plan | Department of Energy  

Office of Environmental Management (EM)

2009 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2010 Annual Plan Ultra-Deepwater and...

430

The Retail Planning Problem under Demand Uncertainty.  

E-Print Network [OSTI]

and Rajaram K. , (2000), Accurate Retail Testing of FashionThe Retail Planning Problem Under Demand Uncertainty GeorgeAbstract We consider the Retail Planning Problem in which

Georgiadis, G.; Rajaram, K.

2012-01-01T23:59:59.000Z

431

6681 urban area recreation planning [n  

Science Journals Connector (OSTI)

landsc. plan. pol. recr. (? recreation area planning ); splanificacin [f] de zonas urbanas de recreo (? planificacin de reas tursticas y de...

2010-01-01T23:59:59.000Z

432

Monitoring Plan for Weatherization Assistance Program, State...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Monitoring Plan for Weatherization Assistance Program, State Energy Program and Energy Efficiency and Conservation Block Grants Monitoring Plan for Weatherization Assistance...

433

Annual Planning Summaries: 2014 | Department of Energy  

Office of Environmental Management (EM)

4 Annual Planning Summaries: 2014 February 19, 2014 2014 Annual Planning Summary for the Office of Advanced Research Projects Agency - Energy The ongoing and projected...

434

ARM - Lesson Plans: Estimating Local Sea Level  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Lesson Plans Lesson Plans: Estimating Local Sea Level Objective The objective is to train students' skills in observing the local environment based upon the sea level...

435

Standard Review Plan - Overview | Department of Energy  

Office of Environmental Management (EM)

Standard Review Plan - Overview Standard Review Plan - Overview The Office of Environmental Management (EM) is responsible for managing the design, construction, operation, and...

436

2014 Headquarters Facilities Master Security Plan- Acronyms  

Broader source: Energy.gov [DOE]

2014 Headquarters Facilities Master Security Plan - Acronyms A list of the acronyms contained in the 2014 Headquarters Facilities Master Security Plan (HQFMSP).

437

2013 Annual Plan | Department of Energy  

Office of Environmental Management (EM)

Annual Plan 2013 Annual Plan Ultra-Deepwater and Uncoventional Natural Gas and Other Petroleum Resources Research and Development Program Report to Congress, June 2013 Section...

438

Partnership Plan, Roadmaps, and Other Documents | Department...  

Energy Savers [EERE]

for reference and information. Partnership Plan U.S. DRIVE Partnership Plan - March 2013 Roadmaps Advanced Combustion and Emissions Control: Advanced Combustion and Emission...

439

SES Performance Management System Plan Training | Department...  

Broader source: Energy.gov (indexed) [DOE]

Management System Plan Training SES Performance Management System Plan Training Overview of the DOE SES Performance Management System. Senior Executive Service Performance...

440

WINDExchange Offshore Wind Webinar: Transmission Planning and...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind WINDExchange Offshore Wind Webinar: Transmission Planning and Interconnection for Offshore Wind...

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Community Energy Strategic Planning Resources | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Resources Community Energy Strategic Planning Resources Presentation for the Community Energy Stategic Planning Resources webinar, presented on January 24, 2013 as part of the U.S....

442

Guide to Community Energy Strategic Planning: Introduction  

Broader source: Energy.gov (indexed) [DOE]

Energy%20Plan1.pdf Boulder, CO - Climate Action Plan www.bouldercolorado.govindex.php?optioncomcontent&viewarticle&id15356&Itemid2150 Chicago, IL - Chicago Climate...

443

Marketing plan for accountancy company Passiva Ltd.  

E-Print Network [OSTI]

??The purpose of thesis was to generate a marketing plan for Estonian accountancy company Passiva Ltd. The marketing plan as such, helps the entrepreneur sell (more)

Rtte, Maaria

2012-01-01T23:59:59.000Z

444

Building Emergency Plan - Department of Mathematics, Purdue ...  

E-Print Network [OSTI]

Aug 30, 2013 ... BEP Tracking Form. ..... mind as you read through the document. .... Building Emergency Plan: The plan is a document that consists of...

Physical Facilities

2013-11-12T23:59:59.000Z

445

CRAD, Communications Assessment Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Assessment Plan CRAD, Communications Assessment Plan Performance Objective: Lines of authority are clearly defined with clear and open communications existing between...

446

PROJECT PLANNING TEMPLATE | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

PLANNING TEMPLATE PROJECT PLANNING TEMPLATE More Documents & Publications Proposed Data Elements for PARS II Web Application Slide 1 Critical Decision 2 (CD-2) Approval Template...

447

State Energy Program Strategic Plan: February 2007  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

State Energy Program Strategic Plan )HEUXDU SEP Strategic Plan February 2007 TABLE OF CONTENTS Foreword iii Mission and Operations 1 Current Energy Trends 1 Key Drivers 3 Setting...

448

Enterprise Architecture Transition Plan - April 2011 | Department...  

Office of Environmental Management (EM)

Enterprise Architecture Transition Plan - April 2011 Enterprise Architecture Transition Plan - April 2011 DOE ETP Submission040411.docx More Documents & Publications Impacts of...

449

Campus Sustainability Office Campus Planning Office  

E-Print Network [OSTI]

Campus Sustainability Office (CSO) Campus Planning Office (CPO) Campus Sustainability Manager (Molly Bressers) Campus Sustainability Office and Campus Planning Office September 2014 Student Employee

Caughman, John

450

Chicago Climate Action Plan | Open Energy Information  

Open Energy Info (EERE)

Action Plan Action Plan Jump to: navigation, search Name Chicago Climate Action Plan Agency/Company /Organization City of Chicago Focus Area Buildings, Energy Efficiency - Central Plant, Greenhouse Gas, Other, Non-renewable Energy, Transportation, Renewable Energy Phase Prepare a Plan Topics Low emission development planning Resource Type Case studies/examples Availability Free Website http://www.chicagoclimateactio Locality Chicago, IL References Chicago Climate Action Plan[1] Overview Chicago's Climate Action Plan addresses both mitigation of and adaptation to climate change and encompasses the entire city (rather than only City operations). The plan contains a high-level overview of Chicago's climate action initiatives, including 26 mitigation strategies and nine adaptation

451

Security, Emergency Planning & Safety Records | Department of...  

Broader source: Energy.gov (indexed) [DOE]

Security, Emergency Planning & Safety Records Security, Emergency Planning & Safety Records ADM 180.pdf More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 18: SECURITY,...

452

Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: A planning parameters study  

SciTech Connect (OSTI)

Purpose: Adaptive radiation therapy for prostate cancer using online reoptimization provides an improved control of interfractional anatomy variations. However, the clinical implementation of online reoptimization is currently limited by the low efficiency of current strategies and the difficulties associated with integration into the current treatment planning system. This study investigates the strategies for performing fast (?2 min) automatic online reoptimization with a clinical fluence-map-based treatment planning system; and explores the performance with different input parameters settings: dose-volume histogram (DVH) objective settings, starting stage, and iteration number (in the context of real time planning).Methods: Simulated treatments of 10 patients were reoptimized daily for the first week of treatment (5 fractions) using 12 different combinations of optimization strategies. Options for objective settings included guideline-based RTOG objectives, patient-specific objectives based on anatomy on the planning CT, and daily-CBCT anatomy-based objectives adapted from planning CT objectives. Options for starting stages involved starting reoptimization with and without the original plan's fluence map. Options for iteration numbers were 50 and 100. The adapted plans were then analyzed by statistical modeling, and compared both in terms of dosimetry and delivery efficiency.Results: All online reoptimized plans were finished within ?2 min with excellent coverage and conformity to the daily target. The three input parameters, i.e., DVH objectives, starting stage, and iteration number, contributed to the outcome of optimization nearly independently. Patient-specific objectives generally provided better OAR sparing compared to guideline-based objectives. The benefit in high-dose sparing from incorporating daily anatomy into objective settings was positively correlated with the relative change in OAR volumes from planning CT to daily CBCT. The use of the original plan fluence map as the starting stage reduced OAR dose at the mid-dose region, but increased the monitor units by 17%. Differences of only 2cc or less in OAR V50%/V70Gy/V76Gy were observed between 100 and 50 iterations.Conclusions: It is feasible to perform automatic online reoptimization in ?2 min using a clinical treatment planning system. Selecting optimal sets of input parameters is the key to achieving high quality reoptimized plans, and should be based on the individual patient's daily anatomy, delivery efficiency, and time allowed for plan adaptation.

Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W. Robert; Yin, Fang-Fang; Wu, Q. Jackie [Duke Medical Physics Graduate Program, Duke University, Durham, North Carolina 27705 and Department of Radiation Oncology, Duke University Medical Center, Durham, North Carolina 27710 (United States)] [Duke Medical Physics Graduate Program, Duke University, Durham, North Carolina 27705 and Department of Radiation Oncology, Duke University Medical Center, Durham, North Carolina 27710 (United States)

2013-11-15T23:59:59.000Z

453

DIGITAL ARCHITECTURE PROJECT PLAN  

SciTech Connect (OSTI)

The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new technologies.

Ken Thomas

2014-09-01T23:59:59.000Z

454

Strategic Plan | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Strategic Plan Strategic Plan Strategic Plan Strategic Plan A modern, reliable, secure, affordable and environmentally sensitive national energy infrastructure is fundamental to our quality of life and energy future. Yet since 1982, growth in peak demand for electricity has exceeded the growth and development of our electric grid. This demand growth will continue due to a growing population; larger homes with burgeoning IT requirements and more elaborate appliances; and the growth of electric vehicles; as well as, the day-to-day energy required to power our hospitals, schools, industries and other necessities of life. The electricity we use today is delivered via an electric infrastructure built with 19th and 20th century technologies which are inadequate to keep pace

455

ORISE: Scientific Peer Review Planning  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning Planning Woman participating in a peer review The Oak Ridge Institute for Science and Education (ORISE) begins the peer review planning process by analyzing the purpose of the funds to be distributed. Because each agency's needs are different, ORISE then designs and manages a flexible, scientific peer review process that can be modified based on a sponsor's regulatory, policy and operational requirements. ORISE's existing tools and systems, and knowledge of reviewing proposals from a government agency perspective, are helping to promote the quality and credibility of scientific information and funded research. ORISE's peer review planning process ensures each objective review is completed on schedule, within budget and with a high degree of process integrity.

456

Hoisting & Rigging Lift Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Hoisting & Rigging Lift Plan Hoisting & Rigging Lift Plan Stanford Synchrotron Radiation Laboratory May 16, 2005 SSRL-HRLP-000-R0 Page 1 of 3 General Information Lift Plan Document # Plan prepared by: Describe the load or items to be lifted: Could the load, if dropped, release hazardous materials or radioactivity? No Yes (describe) Is the load irreplaceable or would it be very costly to replace if damaged? No Yes (describe) Brief description of lift activities (specify if rolling or flipping involved) Equipment Information Equipment ID: Equipment custodian: Rated capacity: Operator capacity : Personnel Protective Equipment (PPE) Steel-toed shoes Required for all personnel involved with lift activity to protect from crushing of feet/toes

457

Light Sources Directorate Strategic Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Light Sources Directorate Light Sources Directorate Strategic Plan December 2009 Light Sources Directorate Strategic Plan December 2009 ii | Vision and Mission Light Sources Directorate Strategic Plan The VISION of the Light Sources Directorate is: to be a provider of choice for world-class photon science and facilities that deliver outstanding scientific productivity and impact, and to be recognized as a leader in developing innovative techniques and ap- plications of photon science Our MISSION is defined by the set of activities that are required to realize this vision: to advance scientific knowledge and to solve critical problems through the design, construction, operation, and use of premier photon science facilities | Table of Contents Light Sources Directorate Strategic Plan

458

4853 recreation area planning [n  

Science Journals Connector (OSTI)

landsc. plan. pol. recr....(Development of policies, strategies and measures to make an area attractive for recreation users);splanificacin [f] de reas tursticas y de recreo (Planificacin y apli...

2010-01-01T23:59:59.000Z

459

Radiological Emergency Response Plan (Vermont)  

Broader source: Energy.gov [DOE]

This legislation establishes a radiological emergency response plan fund, into which any entity operating a nuclear reactor or storing nuclear fuel and radioactive waste in this state (referred to...

460

European telecommunications: Commission plans ahead  

Science Journals Connector (OSTI)

... plans for the preparatory phase of a major research and development programme to modernize European telecommunications. Known as Research in Advanced Communications in Europe (RACE), the programme will be ... Community research ministers at their meeting on 4 June.

Anna Lubinska

1985-03-28T23:59:59.000Z

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

River Protection Project System Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

gallons (Mgal) 1 closure of radioactive waste contained in the Hanford Site waste tanks and 2 This version of the RPP System Plan (Rev. 6) is a major update of the previous...

462

BUSINESS PLAN LBNL Main Site  

E-Print Network [OSTI]

of petroleum products (new or used) in aboveground tanks or containers. NoDoes your facility have Regulated for which an emergency plan is required pursuant to 10 CFR Parts 30, 40 or 70? Yes Underground Petroleum

Eisen, Michael

463

Generation Planning (pbl/generation)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Generation Hydro Power Wind Power Monthly GSP BPA White Book Dry Year Tools Firstgov Generation Planning Thumbnail image of BPA White Book BPA White Book (1998 - 2011) Draft Dry...

464

Academic Testing Services STRATEGIC PLAN  

E-Print Network [OSTI]

Academic Testing Services STRATEGIC PLAN 2009 MISSION STATEMENT Academic Testing Services provides proctored testing services administered in a secure and appropriate standardized testing environment. VISION STATEMENT Academic Testing Services will provide quality services that are integral to recruitment

Rock, Chris

465

Land and Facility Use Planning  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Land and Facility Use Planning process provides a way to guide future site development and reuse based on the shared long-term goals and objectives of the Department, site and its stakeholders. Does not cancel other directives.

1996-07-09T23:59:59.000Z

466

Marketing Communications Plan for SKC  

E-Print Network [OSTI]

Marketing Communications graduate students at the University of Kansas worked with SKC, a unified communications integrator, to conduct primary and secondary research to develop a strategic marketing communications plan for the organization...

Cofer, Katie; Hester, Mai; Gregory, Chris; Schaub, Jenni

2014-09-03T23:59:59.000Z

467

CLEMSON UNIVERSITY Sustainability Action Plan  

E-Print Network [OSTI]

.......................................................................... 8 Action Steps for Sustainability Education, Culture, and Leadership CLEMSON UNIVERSITY Sustainability Action Plan Submitted by the President's Commission on Sustainability, August 1, 2011 Version 1.0.9 #12; 1 Table of Contents President

Duchowski, Andrew T.

468

Performance Evaluation and Measurement Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Support Contract FY15 Performance Evaluation and Measurement Plan Printed on: December 30, 2014 Mission Support Contract Section J - November 2014 Contract No. DE-AC06-09RL14728...

469

Sample Business Plan Framework 3  

Broader source: Energy.gov [DOE]

U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 1: A program seeking to continue operations in the post-grant period as a not-for-profit (NGO) entity.

470

Sample Business Plan Framework 5  

Broader source: Energy.gov [DOE]

U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 1: A program seeking to continue operations in the post-grant period as a not-for-profit (NGO) entity.

471

Sample Business Plan Framework 2  

Broader source: Energy.gov [DOE]

U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 1: A program seeking to continue operations in the post-grant period as a not-for-profit (NGO) entity.

472

Sample Business Plan Framework 1  

Broader source: Energy.gov [DOE]

U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 1: A program seeking to continue operations in the post-grant period as a not-for-profit (NGO) entity.

473

Nuclear Waste Disposal Plan Drafted  

Science Journals Connector (OSTI)

Nuclear Waste Disposal Plan Drafted ... Of all the issues haunting nuclear power plants, that of disposing of the radioactive wastes and spent nuclear fuel they generate has been the most vexing. ...

1984-01-09T23:59:59.000Z

474

OpenEI Community - planning  

Open Energy Info (EERE)

Kicks Off http:en.openei.orgcommunityblogdetailed-planning-kicks

Skype call this morning to discuss details. More info coming soon

http:en.openei.org...

475

Integrating Timeliner and autonomous planning  

E-Print Network [OSTI]

Timeliner is used to automate tasks in a target system. Timeliner is capable of automating complex sequences of actions, but the desired actions must be planned out and understood in advance by human script-writers. This ...

Swanton, Daniel Reed

2006-01-01T23:59:59.000Z

476

2013 Strategic Sustainability Performance Plan  

Office of Energy Efficiency and Renewable Energy (EERE)

2013 Strategic Sustainability Performance Plan, a report to the White House Council on Environmental Quality and Office of Management and Budget, June 2013, by the U.S. Department of Energy.

477

NIST 3-Year Programmatic Plan  

E-Print Network [OSTI]

areas critical to the nation's economy.The America COMPETES Act outlines major roles for NIST-year period.NIST will continue to refine this plan as it works with the Administration to address national

478

Sample Business Plan Framework 4  

Broader source: Energy.gov [DOE]

U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 1: A program seeking to continue operations in the post-grant period as a not-for-profit (NGO) entity.

479

Strategic Energy Planning | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Strategic Energy Planning Strategic Energy Planning Strategic Energy Planning Below are resources for Tribes on strategic energy planning. Alaska Strategic Energy Plan and Planning Handbook Describes the process for developing a community energy strategic plan and provides fillable fields for Alaska Native villages and communities to input their own information and outcomes from energy planning discussions. The information entered is automatically compiled into a cohesive summary at the end of the document, in effect establishing the community's strategic energy plan. Source: DOE Office of Indian Energy. Developing Tribal Energy Projects: Community Energy Planning Highlights a strategic energy planning process for Tribes that is being put into practice through the DOE Office of Indian Energy's Strategic

480

Annual Planning Summaries: 2013 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3 3 Annual Planning Summaries: 2013 March 25, 2013 2013 Annual Planning Summary for the Thomas Jefferson Site Office 2013 Annual Planning Summary for the Thomas Jefferson Site Office March 25, 2013 2013 Annual Planning Summary for the Pacific Northwest Site Office 2013 Annual Planning Summary for the Pacific Northwest Site Office March 25, 2013 2013 Annual Planning Summary for the New Brunswick Laboratory 2013 Annual Planning Summary for the New Brunswick Laboratory March 25, 2013 2013 Annual Planning Summary for the Strategic Petroleum Reserve 2013 Annual Planning Summary for the Strategic Petroleum Reserve March 25, 2013 2013 Annual Planning Summary for the Rocky Mountain Oilfield Testing Center 2013 Annual Planning Summary for the Rocky Mountain Oilfield Testing Center

Note: This page contains sample records for the topic "op plan approp" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING  

Broader source: Energy.gov (indexed) [DOE]

POST-DEACTIVATION SURVEILLANCE AND POST-DEACTIVATION SURVEILLANCE AND MAINTENANCE PLANNING Post-Deactivation Surveillance and Maintenance Planning Dependence of End-Points Planning on S&M Planning Primary Surveillance Concerns Typical Deactivation S&M Plan Contents Example of a Post-Deactivation S&M Plan Dependence of End-Points Planning on S&M Planning One of the key elements of end-point planning is knowing what the post-deactivation S&M activities will be so that conditions can be established to support them. The post-deactivation S&M plan specifies the surveillance, inspection, and maintenance of the facility in the deactivated state. It should address the activities, the locations in which they will be conducted, and their frequency. Part of the S&M planning is

482

San Angelo Metropolitan Transportation Plan  

E-Print Network [OSTI]

Approved by the Policy Committee on November 16, 2009 Amendment (Draft) January 14, 2010 (Final) February 11, 2010 (pending Board approval) Prepared by: San Angelo Metropolitan Planning Organization In cooperation with... of the U.S. Department of Transportation. SAN ANGELO METROPOLITAN PLANNING ORGANIZATION POLICY COMMITTEE MEMBERSHIP Voting Members Jon Mark Hogg, Chairperson* Mayor Pro Tempore, City of San Angelo Clinton Bailey City Engineer, City of San...

San Angelo Metropolitan Planning Organization

2009-11-16T23:59:59.000Z

483

Cutting Family Planning in Texas  

Science Journals Connector (OSTI)

...priority system, with organizations that provide comprehensive primary care taking precedence over those providing only family planning services (see pie charts). The Texas legislature also imposed new restrictions on abortion care and reauthorized the exclusion of organizations affiliated with abortion... Four fundamental principles drive public funding for family planning. First, unintended pregnancy is associated with negative health consequences, including reduced use of prenatal care, lower breast-feeding rates, and poor maternal and neonatal outcomes....

White K.Grossman D.Hopkins K.Potter J.E.

2012-09-27T23:59:59.000Z

484

Planning integration FY 1995 Multi-Year Program Plan (MYPP)/Fiscal Year Work Plan (FYWP)  

SciTech Connect (OSTI)

This Multi-Year Program Plan (MYPP) for the Planning Integration Program, Work Breakdown structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes a binding agreement between RL and the performing contractors for the work to be performed. It was prepared by the Westinghouse Hanford Company (WHC) and the Pacific Northwest Laboratory (PNL). This MYPP provides a picture from fiscal year 1995 through FY 2001 for the Planning Integration Program. The MYPP provides a window of detailed information for the first three years. It also provides `execution year` work plans. The MYPP provides summary information for the next four years, documenting the same period as the Activity Data Sheets.

Not Available

1994-09-01T23:59:59.000Z

485

Colorado Natural Heritage Program Wetland Program Plan  

E-Print Network [OSTI]

Colorado Natural Heritage Program Wetland Program Plan A Vision for Building Comprehensive Wetland Information for the State of Colorado Planning Years 2011­2015 #12;Colorado Natural Heritage Program Wetland Program Plan A Vision for Building Comprehensive Wetland Information for the State of Colorado Planning

486

Quality Work Plan Inspection and Monitoring Requirement  

Broader source: Energy.gov [DOE]

Inspection and monitoring requirements for Weatherization Assistance Program's comprehensive Quality Work Plan.

487

Strategic Energy Planning Webinar Presentation Slides  

Broader source: Energy.gov [DOE]

Download presentation slides from the DOE Office of Indian Energy webinar on strategic energy planning.

488

ESPC ENABLE Measurement and Verification Plan Template  

Broader source: Energy.gov [DOE]

Document contains a comprehensive measurement and verification plan template for a proposed ESPC ENABLE project.

489

Technology Planning in Smaller Organizations or Nonprofits  

E-Print Network [OSTI]

1 Technology Planning in Smaller Organizations or Nonprofits (This is quite practical material...) Before we begin: See http://www.nten.org/ Why Undertake Technology Planning? Source: Podolsky, 2003 Wired for Good Planning can ensure technology supports the mission and strategic goals Planning

Schweik, Charles M.

490

Question and Answers Alternative Fuel Readiness Plans  

E-Print Network [OSTI]

Question and Answers Alternative Fuel Readiness Plans PON-13-603 September 3, 2013 Eligibility Q1 to readiness plans? A1 This solicitation is limited to readiness planning only for alternative fuels. Q2 In regards to PON-13-603 - Alternative Fuel Readiness Plans, is electricity used for transportation

491

Alternative Fuels Data Center: State Energy Plan  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

State Energy Plan to State Energy Plan to someone by E-mail Share Alternative Fuels Data Center: State Energy Plan on Facebook Tweet about Alternative Fuels Data Center: State Energy Plan on Twitter Bookmark Alternative Fuels Data Center: State Energy Plan on Google Bookmark Alternative Fuels Data Center: State Energy Plan on Delicious Rank Alternative Fuels Data Center: State Energy Plan on Digg Find More places to share Alternative Fuels Data Center: State Energy Plan on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type State Energy Plan The Virginia Energy Plan assesses the commonwealth's primary energy sources and recommends actions to meet the following goals: make Virginia the energy capital of the East Coast by expanding traditional and alternative

492

Alternative Fuels Data Center: State Transportation Plan  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

State Transportation State Transportation Plan to someone by E-mail Share Alternative Fuels Data Center: State Transportation Plan on Facebook Tweet about Alternative Fuels Data Center: State Transportation Plan on Twitter Bookmark Alternative Fuels Data Center: State Transportation Plan on Google Bookmark Alternative Fuels Data Center: State Transportation Plan on Delicious Rank Alternative Fuels Data Center: State Transportation Plan on Digg Find More places to share Alternative Fuels Data Center: State Transportation Plan on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type State Transportation Plan The California Department of Transportation (Caltrans) must update the California Transportation Plan (Plan) by December 31, 2015, and every five

493

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Broader source: Energy.gov (indexed) [DOE]

Quality Assurance Plan Examples Quality Assurance Plan Examples Example 64 8.3 QUALITY ASSURANCE This section describes policies and procedures that will be used to meet QA program objectives. This section also develops the strategies PFP will use to ensure the S&M of the PFP inventory, the material stabilization project, the deactivation project, and the dismantlement of the PFP Complex buildings and are completed in a high quality manner. 8.3.1 QA Program The QA program for the PFP Stabilization and Deactivation Project is implemented in accordance with the requirements of 10 CFR 830.120, Quality Assurance Requirements, (QA Rule) and HNF-PRO-260, Quality Assurance Program . The manner in which the requirements are implemented is specified in QA program plans and implementing procedures for the PFP Complex. The QA

494

PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

- March 2013 Page 1 - March 2013 Page 1 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE PLAN (AFP) 1 OCTOBER 2012 through 30 SEPTEMBER 2013 Contract No. DE- EM-0001971 I. INTRODUCTION This Performance Evaluation and Measurement Plan (PEMP) provides a standard process for development, administration, and coordination of all phases of the fee determination process consistent with Section B.2 of the subject contract. Fee determinations are not subject to the Disputes Clause of the contract. II. ORGANIZATIONAL STRUCTURE AND DUTIES The following organizational structure is established for administering the fee provisions of the contract. A. Roles and Responsibilities 1. Fee Determination Official (FDO) - The Head of Contracting Activity (HCA) has appointed the CBFO Manager as the FDO. The FDO

495

2011-2020 Strategic Plan | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Plan 2011-2020 Strategic Plan LM has completed its 2011-2020 Strategic Plan. The new plan provides our organization with clear directions for the future. 2011-2020 Strategic Plan...

496

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Broader source: Energy.gov (indexed) [DOE]

Communication and Stakeholder Involvement Communication and Stakeholder Involvement Plan Examples Example 49 10.0 COMMUNICATIONS AND PUBLIC INVOLVEMENT The transition of B Plant is a critical element in Hanford's mission of environmental management. The B Plant Transition Project Management Team have made a commitment to open communications throughout transition because effective communications and public involvement are critical success factors for the project. Communications must be living and dynamic, responding to accomplishments and emerging issues or activities. A communications plan will be developed to define specific actions for disseminating information regarding project objectives, strategies, problems/issues, and status, and for developing strategies for soliciting input/involvement throughout the deactivation

497

Realistic Financial Planning and Rapid  

Broader source: Energy.gov (indexed) [DOE]

Realistic Financial Planning and Rapid Realistic Financial Planning and Rapid Modification to Project Execution are Essential PMLL Identifier: PMLL-2010-LLNL-NIF-0001 (Source: User Submitted) Validator: Victoria Pratt Date: 4/27/2010 Contact: 202-586-7358 Statement: Schedule and cost impacts can be reduced by accounting for potential annual funding delays as well as by adjusting project execution rapidly Discussion: The NIF Project was funding constrained, and planned (per Acquisition Executive direction) with the assumption that the full annual funding in the budget profile would be available early in October. Any delays or changes in the annual funding availability required extraordinary measures both for obtaining the funding required to avoid significant project impacts in a timely manner, and in rapidly adjusting project execution.

498

Transmission Planning | Department of Energy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Planning Planning Transmission Planning Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The National Transmission Grid Study (PDF 2.0 MB) made clear that without dramatic improvements and upgrades over the next decade our nation's transmission system will fall short of the reliability standards our economy requires, and will result in higher electricity costs to consumers. The Department's research into a variety of tools that will improve advanced system monitoring, visualization, control, operations, and market structure will ultimately modernize the electricity transmission infrastructure to ease congestion, allow for increases in demand, and provide a greater degree of security. The next generation supervisory control and data acquisition (SCADA) and

499

Appendix V Public Involvement Plan  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

V V Public Involvement Plan Revision No.: 6 February 2008 Federal Facility Agreement and Consent Order (FFACO) FFACO, Appendix V February 2008 i FFACO Public Involvement Plan U.S. Department of Energy National Nuclear Security Administration Nevada Site Office Las Vegas, Nevada U.S. Department of Defense Defense Threat Reduction Agency Detachment 1, Nevada Operations Mercury, Nevada U.S. Department of Energy Office of Legacy Management Grand Junction, Colorado FFACO, Appendix V February 2008 ii Preface The Public Involvement Plan serves two purposes: it provides a broad public involvement strategy, and fulfills requirements contained in the Federal Facility Agreement and Consent Order (FFACO) relating to public awareness and participation. Under the FFACO, agreed to by

500

Specific test and evaluation plan  

SciTech Connect (OSTI)

The purpose of this Specific Test and Evaluation Plan (STEP) is to provide a detailed written plan for the systematic testing of modifications made to the 241-AX-B Valve Pit by the W-314 Project. The STEP develops the outline for test procedures that verify the system`s performance to the established Project design criteria. The STEP is a lower tier document based on the W-314 Test and Evaluation Plan (TEP). Testing includes Validations and Verifications (e.g., Commercial Grade Item Dedication activities), Factory Acceptance Tests (FATs), installation tests and inspections, Construction Acceptance Tests (CATs), Acceptance Test Procedures (ATPs), Pre-Operational Test Procedures (POTPs), and Operational Test Procedures (OTPs). It should be noted that POTPs are not required for testing of the transfer line addition. The STEP will be utilized in conjunction with the TEP for verification and validation.

Hays, W.H.

1998-03-20T23:59:59.000Z