Powered by Deep Web Technologies
Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Power Plant Dams (Kansas)  

Broader source: Energy.gov [DOE]

This act states the provisions for erection and maintenance of dams. When any person, corporation or city may be desirous of erecting and maintaining a milldam or dam for generating power across...

2

Smoke-Free Olympics  

E-Print Network [OSTI]

for the enthusiastic smoker. Despite an ambitious promise from the government of a "smoke-free Olympics" the market here is 350 million... and growing. So when a restaurant chain called Meizhou Dongpo responded to a call to make restaurants smoke-free, they quickly...

Hacker, Randi; Tsutsui, William

2008-01-30T23:59:59.000Z

3

Sustainability transformations in Olympic host cities  

E-Print Network [OSTI]

The Olympic Games represent an unparalleled fast-track urban development opportunity for Olympic host cities. Taking the premise that the transformational effect of the Olympics has a potential to drive long-term urban ...

Mokrushina, Ksenia

2012-01-01T23:59:59.000Z

4

Dams, Mills, and Electric Power (Missouri)  

Broader source: Energy.gov [DOE]

The Water Resources Center of the Missouri Department of Natural Resources is responsible for implementing regulations pertaining to dam and reservoir safety. Any person or corporation may erect a...

5

athens olympic games: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

University ,,Accessible Web Design" Universidad Politcnica Heiz, Ulrich 7 Olympic Robot Building Manual MIT - DSpace Summary: The 1989 AI Lab Winter Olympics will take a...

6

A flexible system for Olympic villages  

E-Print Network [OSTI]

This thesis suggests a flexible system and its systems approach in constructing Olympic Villages which are used both during and after the Games. A historical overview of ancient Olympia and modern Olympia, as well as a ...

Chung, Se-Hack

1985-01-01T23:59:59.000Z

7

Water quality and sedimentation implications of installing a hydroelectric dam on the Río Baker in Chilean Patagonia  

E-Print Network [OSTI]

HidroAysen, a Chilean corporation operated by energy giant Endesa, has proposed to build two hydroelectric dams on the Rio Baker in the Aysin Region of Chilean Patagonia. The proposed dams have been met with a variety of ...

Leandro, Gianna Dee

2009-01-01T23:59:59.000Z

8

Dam Safety Program (Maryland)  

Broader source: Energy.gov [DOE]

The Dam Safety Division within the Department of the Environment is responsible for administering a dam safety program to regulate the construction, operation, and maintenance of dams to prevent...

9

Dam Safety (Pennsylvania)  

Broader source: Energy.gov [DOE]

The Pennsylvania Department of Environmental Protection's Division of Dam Safety provides for the regulation and safety of dams and reservoirs throughout the Commonwealth in order to protect the...

10

How to prepare an airport for the Olympic Games? : transportation of the Olympic Family Members  

E-Print Network [OSTI]

This thesis describes and assesses the preparation of Athens International Airport for and its performance during the Olympic Games in 2004. The analysis includes infrastructural modifications made and organizational ...

Kassens, Eva

2005-01-01T23:59:59.000Z

11

2012 London Olympics Go for the Green with Its Energy Efficient...  

Broader source: Energy.gov (indexed) [DOE]

2 London Olympics Go for the Green with Its Energy Efficient, Sustainable, and Recyclable Design 2012 London Olympics Go for the Green with Its Energy Efficient, Sustainable, and...

12

Dam Safety Regulation (Mississippi)  

Broader source: Energy.gov [DOE]

The purpose of the Dam Safety Regulation is to ensure that all dams constructed in the state of Mississippi are permitted and thus do not potentially harm wildlife, water supplies and property. ...

13

Dam Safety (Delaware)  

Broader source: Energy.gov [DOE]

The Delaware Dam Safety Law was adopted in 2004 and provides the framework for proper design, construction, operation, maintenance, and inspection of dams in the interest of public health, safety,...

14

Dam Safety Regulations (Connecticut)  

Broader source: Energy.gov [DOE]

All dams, except those owned by the U.S., are under the jurisdiction of these regulations. These dams will be classified by hazard rating, and may be subject to periodic inspections. The...

15

Dams – Fishways (Iowa)  

Broader source: Energy.gov [DOE]

No permanent dam or obstruction may be placed in the waters of the state without providing for fish passage.

16

Dam Safety Program (Florida)  

Broader source: Energy.gov [DOE]

Dam safety in Florida is a shared responsibility among the Florida Department of Environmental Protection (FDEP), the regional water management districts, the United States Army Corps of Engineers ...

17

Dams, Dikes, and Other Devices; Dam Safety Program (North Dakota)  

Broader source: Energy.gov [DOE]

These regulations govern the permitting, construction, operation, inspection, and hazard classifications of dams, dikes, and other water impoundments. The Dam Safety page of the State Water...

18

Dam Safety Standards (New Jersey)  

Broader source: Energy.gov [DOE]

These rules set forth procedures for application to construct, repair or modify a dam and set standards for design and maintenance of dams. These rules also establish a dam inspection procedure....

19

Montana Dam Safety Act (Montana)  

Broader source: Energy.gov [DOE]

This Act establishes the state's interest in the construction of dams for water control and regulation and for hydropower generation purposes. It regulates dam construction, operation, and...

20

Design for reuse : post occupancy of Olympic stadiums  

E-Print Network [OSTI]

On the surface, the spirit of Olympic Games is about the competition for medals. Underneath the surface, however, lies a series of political, economical, social agendas. Individual Olympians represent their Nations. Rising ...

Lin, George X. (George Xinxin)

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Building an artifact : an Olympic archery venue for Williamsburg, NYC  

E-Print Network [OSTI]

Every four years, cities throughout the world compete for the right to host the Olympic games. The competition is vigorous because the rewards in terms of increased visibility on the world stage, are perceived to be great. ...

Braddock, William Jonathan, 1977-

2005-01-01T23:59:59.000Z

22

The Olympics of science knowledge at DOE's New Jersey Regional...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Olympics of science knowledge at DOE's New Jersey Regional Science Bowl at PPPL By Jeanne Jackson DeVoe March 3, 2014 Tweet Widget Google Plus One Share on Facebook The J Droids, a...

23

Dams (South Dakota)  

Broader source: Energy.gov [DOE]

Dam construction in South Dakota requires a Location Notice or a Water Right Permit. A Location Notice is a form that must be filed with the County Register of Deeds, and is the only paperwork...

24

Regulation of Dams (Indiana)  

Broader source: Energy.gov [DOE]

The owner of a dam is required to maintain the structure in good condition, and notify the Department of Environmental Management upon the sale or transfer of ownership of the structure. The...

25

Dam Safety (Michigan)  

Broader source: Energy.gov [DOE]

This rule requires that anyone who desires to construct a dam that is 6 feet or more in height and impounds 5 surface acres or more at the design flood elevation, must first obtain a permit from...

26

Dam Safety (North Carolina)  

Broader source: Energy.gov [DOE]

North Carolina Administrative Code Title 15A, Subchapter 2K lays out further regulations for the design, approval, construction, maintenance, and inspection of dams to ensure public safety and...

27

Flood Protection and Dam Safety (Virginia)  

Broader source: Energy.gov [DOE]

All dams in Virginia are subject to the Dam Safety Act and Dam Safety Regulations unless specifically excluded. A dam is excluded if it: (a) is less than six feet high; (b) has a maximum capacity...

28

Mills, Dams, and Reservoirs (Massachusetts)  

Broader source: Energy.gov [DOE]

This chapter of the Massachusetts General Laws outlines procedures to settle disputes regarding the construction and operation of dams on non-navigable waters. Dam construction or alteration is...

29

Dam Safety Rules (West Virginia)  

Broader source: Energy.gov [DOE]

This establishes requirements relating to the design, placement, construction, enlargement, alteration, removal, abandonment, and repair of dams and also establishes requirements to govern the...

30

LHC Olympics Workshop and String Phenomenology 2006 Conference  

SciTech Connect (OSTI)

This is the final report of the organizers of the String Phenomenolgy program of which the LHC Olympics and the String Phenomenolgy conference were a part. In addition, it includes the list of talks from our website which comprise the online proceedings. The KITP no longer publishes conferences proceedings but rather makes recordings and visuals of all talks available on its website at www.kitp.ucsb.edu Program talks are available at http://online.kitp.ucsb.edu/online/strings06/ Conference talks are are at http://online.itp.ucsb.edu/online/strings_c06/ and LHC Olympics talks are at http://online.itp.ucsb.edu/online/lhco_c06/. These talks constitute the proceedings of these meetings.

David Gross

2006-10-01T23:59:59.000Z

31

Huub van Dam | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-SeriesFlickr FlickrGuidedCH2MLLC HistoryVeteranstoHuub van Dam Recent Highlights

32

Huub van Dam | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation ProposedUsingFun withconfinement plasmasSandy-Nor'easter Situation ReportsHuub van Dam Recent

33

Regulations and Permits Related to Dams (Vermont)  

Broader source: Energy.gov [DOE]

Vermont law requires a permit, or a dam order, for the construction, alteration, or removal of dams impounding more than 500,000 cubic feet of water, including any accumulated sediments. Dam...

34

War damages and reconstruction of Peruca dam  

SciTech Connect (OSTI)

The paper describes the heavy damages caused by blasting in the Peruca rockfill dam in Croatia in January 1993. Complete collapse of the dam by overtopping was prevented through quick action of the dam owner by dumping clayey gravel on the lowest sections of the dam crest and opening the bottom outlet of the reservoir, thus efficiently lowering the water level. After the damages were sufficiently established and alternatives for restoration of the dam were evaluated, it was decided to construct a diaphragm wall through the damaged core in the central dam part as the impermeable dam element and to rebuild the central clay core at the dam abutments. Reconstruction works are described.

Nonveiller, E. [Univ. of Zagreb (Croatia). Faculty of Civil Engineering] [Univ. of Zagreb (Croatia). Faculty of Civil Engineering; Rupcic, J. [Univ. of Zagreb (Croatia). Faculty of Civil Engineering] [Univ. of Zagreb (Croatia). Faculty of Civil Engineering; [Elektroprojekt Consulting Engineering, Zagreb (Croatia); Sever, Z. [Elektroprojekt Consulting Engineering, Zagreb (Croatia)] [Elektroprojekt Consulting Engineering, Zagreb (Croatia)

1999-04-01T23:59:59.000Z

35

Safety of Dams and Reservoirs Act (Nebraska)  

Broader source: Energy.gov [DOE]

This act regulates dams and associated reservoirs to protect health and public safety and minimize adverse consequences associated with potential dam failure. The act describes the responsibilities...

36

Sandia Corporation  

Office of Environmental Management (EM)

Corporation Sandia National Laboratories P.O. Box 5800, MS 0101 Albuquerque, New Mexico 87185-0101 WEL-2012-01 Dear Dr. Hommert: The Office of Health, Safety and Security's...

37

Division of Water, Part 673: Dam Safety Regulations (New York)  

Broader source: Energy.gov [DOE]

These regulations address dam safety, define dam hazard categories and inspection procedures, and apply to any owner of a dam. Dam owners are required to maintain dams in a safe condition at all...

38

Corporate Governance and Taxation  

E-Print Network [OSTI]

Accounting and Corporate Governance,” Journal of Accounting1997) “A Survey of Corporate Governance” Journal of FinanceCorporate Governance and Taxation Mihir A. Desai* Harvard

Dyck, Alexander

2004-01-01T23:59:59.000Z

39

Dam Construction and Maintenance (Minnesota)  

Broader source: Energy.gov [DOE]

Dams may be constructed, improved, or repaired on private, non-navigable waters subject to certain timelines; however, previously-developed hydropower mechanisms cannot be disrupted. The State may...

40

Use, Maintenance, Removal, Inspections, and Safety of Dams (Iowa)  

Broader source: Energy.gov [DOE]

This section describes operating plans for dams with movable structures, as well as procedures for raising or lowering of impoundment levels, dam removal, and dam safety inspections.

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Perspectives on Dam Removal: York Creek Dam and the Water Framework Directive  

E-Print Network [OSTI]

Retirement of Dams and Hydroelectric Facilities. ASCE, Newon the Allier River, a hydroelectric plant in France. Thethe dam generating hydroelectric power versus the ecological

Lawrence, Justin E; Pollak, Josh D; Richmond, Sarah F

2008-01-01T23:59:59.000Z

42

A real options analysis of Olympic Village development : how design flexibility adds value  

E-Print Network [OSTI]

This thesis applies past research on real options - a right, but not an obligation to take some action on a real asset in the future - to a very specific type of real estate development related to Olympic Village development. ...

Martinson, Robert J., S.M. Massachusetts Institute of Technology

2009-01-01T23:59:59.000Z

43

Corporate Profitability and Corporate Longevity  

E-Print Network [OSTI]

49 2 4 6 2.9 Energy Program E 20 32.6 8 1.7 4 8 4 (2.3) F 5 8.1 4 2.4 6 12 (2) (36) G 10 16.3 8 49 6 12 2 (1.1) H 10 16.3 4 0.9 2 4 2 (1.1) With Malar Energy Program E F G H 20 5 10 10 20.0 5.0 10.0 10.0 8 4 8 4 8.0 4...CORPORATE PROFITABILITY AND CORPORATE LONGEVITY Joel S. Gilbert, P.E. Mechanical Technology Incorporated Latham, New York ABSTRACT Many firms have discovered in the last few represents 9 to 12% of the cost of their goods 10 years...

Gilbert, J. S.

1983-01-01T23:59:59.000Z

44

Georgia Safe Dams Act of 1978 (Georgia)  

Broader source: Energy.gov [DOE]

The purpose of the Georgia Safe Dams Act is to provide regulation, inspection and permitting of dams to the State. The Director of the Environmental Protection Division (EPD) is responsible for...

45

Dams and Reservoirs Safety Act (South Carolina)  

Broader source: Energy.gov [DOE]

The Dams and Reservoirs Safety Act provides for the certification and inspection of dams in South Carolina and confers regulatory authority on the Department of Health and Environmental Control....

46

Ethanol Consumption by Rat Dams During Gestation,  

E-Print Network [OSTI]

Ethanol Consumption by Rat Dams During Gestation, Lactation and Weaning Increases Ethanol examined effects of ethanol consumption in rat dams during gestation, lactation, and weaning on voluntary ethanol consumption by their adolescent young. We found that exposure to an ethanol-ingesting dam

Galef Jr., Bennett G.

47

Dam Design and Construction (Wisconsin)  

Broader source: Energy.gov [DOE]

These regulations apply to dams that are not owned by the U.S. government and (a) have a structural height of more than 6 feet and a maximum storage capacity of 50 acre–feet or more of water, (b)...

48

Law and Corporate Governance  

E-Print Network [OSTI]

1997. A survey of corporate governance. J. Finan. 52(2):737-1999. Employees and Corporate Governance. Washington, DC:structural change in corporate governance. J. Law Soc. 27(

Fligstein, Neil; Choo, Jennifer

2005-01-01T23:59:59.000Z

49

Destruction or Alteration of a Dam (Iowa)  

Broader source: Energy.gov [DOE]

Permission from the Environmental Protection Commission is required prior to the removal, destruction, or alteration that results in a lower water level of any existing dam.

50

Green River Locks and Dams 3, 4, 5, 6 and Barren River Lock and Dam 1 Disposition, Kentucky  

E-Print Network [OSTI]

Green River Locks and Dams 3, 4, 5, 6 and Barren River Lock and Dam 1 Disposition, Kentucky 16 September 2014 ABSTRACT: Green River Locks and Dams 3 through 6 and Barren River Lock and Dam 1 were. The Green River Locks and Dams 5 and 6 ceased operations in 1951 due to a marked decline in navigation

US Army Corps of Engineers

51

THE CONTENT OF CORPORATE FEDERALISM  

E-Print Network [OSTI]

Federalism in Corporate Governance: Protecting ShareholderCollaborative Corporate Governance: Listing Standards, Stateof Care Stadanrd in Corporate Governance 75 Iowa L. Rev. 1,

Bratton, William W.

2004-01-01T23:59:59.000Z

52

Corporate sustainability assessment methodology  

E-Print Network [OSTI]

Sustainability is a vague concept specifically in the context of a corporate world. There are numerous definitions for corporate sustainability and just as many ways of evaluating it. This work attempts to define, structure ...

Pinchuk, Natallia

2011-01-01T23:59:59.000Z

53

Yubing Wang EMC Corporation  

E-Print Network [OSTI]

Yubing Wang EMC Corporation Hopkinton, MA 01748, USA wang_yubing@emc.com Mark Claypool Computer@cs.wpi.edu Zheng Zuo EMC Corporation Hopkinton, MA 01748, USA zuo_zheng@emc.com Abstract--The tremendous increase

Claypool, Mark

54

Our Corporate Residents...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the quality and variety of the Corporate Residents who call ETTP home. From young start-ups to Fortune 500 corporations, Heritage Center's resources and assets are being fully...

55

Corporate/Foundation Relations CORPORATE AND FOUNDATION RELATIONS The Offices of Corporate and  

E-Print Network [OSTI]

Corporate/Foundation Relations - 1 - CORPORATE AND FOUNDATION RELATIONS The Offices of Corporate and Foundation Relations (CR, FR) are responsible for coordinating with OSP on applications to key University development and institutional advancement prospects. Applying to Foundations or Corporations. Faculty

Mather, Patrick T.

56

Choices and benefits : alternative access and venue sites for Ä°stanbul Olympics  

E-Print Network [OSTI]

This thesis is based on the idea that the Olympics, a global mega-project that interrupts and re-channels the forces of urban evolution in its host city, can be planned in ways that bring long-term benefits to that city. ...

Alkan, Özgür, BaĹŸ ak, 1977-

2004-01-01T23:59:59.000Z

57

first major B,C,solar energy conference here The Solar Olympics, in which contestants at-  

E-Print Network [OSTI]

first major B,C,solar energy conference here The Solar Olympics, in which contestants at- tempt on solar energy to be held next week at UBC. Solwest 80, the first major solar conference ever held in B.C., is sponsored jointly by the Solar Energy Society of Canada and the Pa,cific North- west Solar Energy

Farrell, Anthony P.

58

Atlanta Centennial Olympic Games and Paralympic Games event study, 1996. Final report, July 1996--August 1996  

SciTech Connect (OSTI)

The Atlanta metropolitan region was the location of one of the most ambitious Intelligent Transportation Systems (ITS) deployments in the United States. This deployment included several individual projects--a Central Transportation Management Center (TMC), six Traffic Control Centers (TCCs), one Transit Information Center (TIC), The Travel Information Showcase (TIS), and the extension of the Metropolitan Atlanta Rapid Transit Authority (MARTA) Rail network and the new high-occupancy vehicle (HOV) lanes on I-85 and I-75. The 1996 Atlanta Centennial Olympic Games and Paralympic Games created a focus for these projects. All of these systems were to be brought on-line in time for the Olympic Games. This report presents the findings of the 1996 Olympic and Paralympic Games Events Study--a compilation of findings of system performance, the benefits realized, and the lessons learned during their operations over the event period. The study assessed the performance of the various Travel Demand Management (TDM) plans employed for Olympic Games traffic management.

Amodei, R.; Bard, E.; Brong, B.; Cahoon, F.; Jasper, K.

1998-11-01T23:59:59.000Z

59

Sex, health, and athletes Recent policy introduced by the International Olympic Committee to regulate hyperandrogenism in  

E-Print Network [OSTI]

and at least one government, India, has already complied, creating a policy that applies to women athletesSex, health, and athletes Recent policy introduced by the International Olympic Committee introduced policies requiring medical investigation of women athletes known or suspected to have

60

Architectural Structures Beijing Olympic Stadium 2008 as Biomimicry of a Bird's Nest  

E-Print Network [OSTI]

Architectural Structures ARCH 251 Beijing Olympic Stadium 2008 as Biomimicry of a Bird's Nest Ann: Bird's Nest 5 Figure 2 Rendering of interior concourse - Beijing National Stadium 8 Figure 3 CAD model welding of steel structure of the Bird's Nest 10 Figure 7 Maasai woman of Kenya plasters dung over her

Barthelat, Francois

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Leveraging Aboriginal Tourism Legacy Benefits from the 2010 Olympics: A Case  

E-Print Network [OSTI]

Leveraging Aboriginal Tourism Legacy Benefits from the 2010 Olympics: A Case Study of Whistler: Master of Resource Management (Planning) Report No. : 606 Title of Project: Leveraging Aboriginal Tourism-established, and also signaled that the power the First Nations will likely increase with respect to local and tourism

62

Civil Engineering Explore the environmental impact of dams.  

E-Print Network [OSTI]

Dams Civil Engineering Objective · Explore the environmental impact of dams. · Discuss the need for dams, and how environmental engineers mitigate some impacts. Standards and Objectives · Earth Systems humans' standard of living and environmental impacts. · The basic concept of constructing a dam

Provancher, William

63

Limited Liability Companies and Corporate Business Structures  

E-Print Network [OSTI]

This publication describes limited liability companies and corporate forms of business organization, including S-Corporations and C-Corporations....

Thompson, Bill; Polk, Wade; Hayenga, Wayne

2009-01-07T23:59:59.000Z

64

Perspectives on Dam Removal: York Creek Dam and the Water Framework Directive  

E-Print Network [OSTI]

supply, flood control, hydropower, and recreation. However,as changes induced by hydropower, flood control, or waterFERC requires private hydropower dams to provide “equal

Lawrence, Justin E; Pollak, Josh D; Richmond, Sarah F

2008-01-01T23:59:59.000Z

65

Safe Dams Act of 1972 (Tennessee)  

Broader source: Energy.gov [DOE]

The Safe Dams Act of 1973 (SDA) gives the Commissioner of the Department of Environment and Conservation the power to issue certificates authorizing the construction, alteration, or operation of a...

66

Dam Safety and Encroachments Act (Pennsylvania)  

Broader source: Energy.gov [DOE]

This act sets the standards and criteria for the siting and design of dams, water obstructions and encroachments considering both existing and projected conditions. It requires operational plans to...

67

Dam Control and Safety Act (West Virginia)  

Broader source: Energy.gov [DOE]

This law grants authority to the secretary of the Department of Environmental Protection to control and exercise regulatory jurisdiction over dams as indicated in the subsections of the law. This...

68

Providing protection: Agencies receive funding to repair, upgrade dams  

E-Print Network [OSTI]

Story by Kathy Wythe tx H2O | pg. 26 Providing protection Agencies receive funding to repair, upgrade dams along with local partners, can apply for grant funds, he said. Construction of the dams began through four federal authorizations... totaling about $11 million. Of the 343 dams currently classified as high hazard, Scattered across Texas are almost 2,000 nondescript, earthen dams built on private land to protect property, roads, and bridges from flood damages. Some of these dams...

Wythe, Kathy

2009-01-01T23:59:59.000Z

69

Characterizing Gender and Race in the 2000 Summer Olympics: NBC's Coverage of Maurice Greene,MichaelJohnson, Marion Jones, and Cathy Freeman  

E-Print Network [OSTI]

emerge, the Olympics being one of the few .global events which consistently attracts extensive worldly attention (Lapchick, 1996). However, in terms of both gender and race politics, the Olympic Games generally reflect larger societal trends. Women... and John Carlos during the 1968 Games in Mexico City are remembered asmonumental moments in American and world history. Like women from allethnicities, African Americans were also excluded from early Olympic competition. However, African Americans (aswell...

Mayeda, David

2001-04-01T23:59:59.000Z

70

Corporate Headquarters 317 Route 104  

E-Print Network [OSTI]

Sustainable Energy Developments, Inc. is a New York Corporation Founded April 2002 Visualization Phone: (978) 422 7744 Sustainable Energy Developments, Inc. is a New York Corporation Founded Energy Developments, Inc. is a New York Corporation Founded April 2002

Firestone, Jeremy

71

Corporate Information & Computing Services  

E-Print Network [OSTI]

Corporate Information & Computing Services High Performance Computing Report March 2008 Author The University of Sheffield's High Performance Computing (HPC) facility is provided by CiCS. It consists of both Graduate Students and Staff. #12;Corporate Information & Computing Services High Performance Computing

Martin, Stephen John

72

Corporate and Business Plan  

E-Print Network [OSTI]

Corporate and Business Plan 2010-2011 #12;Main addresses Forest Research Alice Holt Lodge Farnham Research's Business Plan 2010-2011 ..........................12 Table Contents Table 1 - Income This Corporate and Business Plan sets out FR's aims and strategic objectives. It describes the Key Performance

73

Smith & Franklin Academic Publishing Corporation  

E-Print Network [OSTI]

Smith & Franklin Academic Publishing Corporation www.smithandfranklin.com Science, Religion | Pages 23 Smith & Franklin Academic Publishing Corporation www.smithandfranklin.com ic origin, meant

Tong, Liang

74

MFR PAPER 1222 Effects of Dams on Pacific Salmon  

E-Print Network [OSTI]

. Their numbers were few and their total effect was relatively minor. In the 1880's dams for hydroelectric power. In the 1930's major hydroelectric dams were built on the mainstem Columbia River (Fig. I), initiating

75

Rutgers Business School Corporate Finance  

E-Print Network [OSTI]

Rutgers Business School Corporate Finance Fall 2014 Instructor: Vikram Nanda Office: 5186 to the basic and current research questions and methods ­ theoretical and empirical ­ in corporate finance areas in corporate finance. Among these: · Tirole, Corporate Finance · Finance Handbooks such as: Jarrow

Lin, Xiaodong

76

Design of a Sediment Mitigation System for Conowingo Dam  

E-Print Network [OSTI]

Design of a Sediment Mitigation System for Conowingo Dam Rayhan Ain, Kevin Cazenas, Sheri Gravette as enhanced erosion of sediment due to significantly increased flow rates and constant interaction of water with the Dam. During these events, the sediment build up at Conowingo Dam in the Lower Susquehanna River has

77

Corporate Operating Experience Program  

Broader source: Energy.gov [DOE]

The DOE Corporate Operating Experience Program helps to prevent the recurrence of significant adverse events/trends by sharing performance information, lessons learned and good practices across the DOE complex.

78

Corporate Energy Management Process  

E-Print Network [OSTI]

. May 21-24, 2013 Corporate Energy Management Process 2 ?Brief introduction to BASF ? BASF Corporate Energy Management ? Management Support ? Goals ? Continuous Improvement ? Best Practices ? Recognition ?Summary ESL-IE-13-05-25 Proceedings...-value products ? Intelligent, sustainable system solutions ? 2012 Sales: ?72.1 Billion ? Employees: 110,000 Company overview BASF ? The Chemical Company ESL-IE-13-05-25 Proceedings of the Thrity-Fifth Industrial Energy Technology Conference New Orleans, LA...

Geiger, T.

2013-01-01T23:59:59.000Z

79

Chapter 13 Water Resources Hoover Dam  

E-Print Network [OSTI]

management Water shortage linked to food supply Learning Objectives #12; The global water cycleChapter 13 Water Resources #12;Hoover Dam #12;The Colorado River Basin Population growth Urbanization Climate change #12; Water cycle Water use Surface water and groundwater processes Water

Pan, Feifei

80

EVOLVING EXPECTATIONS OF DAM REMOVAL OUTCOMES: DOWNSTREAM GEOMORPHIC EFFECTS FOLLOWING REMOVAL OF A SMALL, GRAVEL-FILLED DAM1  

E-Print Network [OSTI]

EVOLVING EXPECTATIONS OF DAM REMOVAL OUTCOMES: DOWNSTREAM GEOMORPHIC EFFECTS FOLLOWING REMOVAL downstream were virtually undetectable. One year after dam removal, substrates of bars and riffles within 400 m downstream of the dam coarsened and a dominance of gravel and cobble sediments replaced previously

Tullos, Desiree

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Quality Assurance Corporate Board | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Assurance Corporate Board Quality Assurance Corporate Board The Office of Environmental Management (EM) Quality Assurance Corporate Board is an executive board that includes both...

82

Corporate Law's Current-Owner Bias  

E-Print Network [OSTI]

Owner Bias in Corporate Governance Jesse Fried * Boalt Hallmy conclusion that corporate governance arrangements choseninterventions in corporate governance through the securities

Fried, Jesse M.

2005-01-01T23:59:59.000Z

83

Corporate Law's Current-Owner Bias  

E-Print Network [OSTI]

Owner Bias in Corporate Governance Jesse Fried * Boalt Hallmy conclusion that corporate governance arrangements choseninterventions in corporate governance through the securities

Fried, Jesse M.

2006-01-01T23:59:59.000Z

84

Corporate Governance, the Environment, and the Internet  

E-Print Network [OSTI]

contemporary society: Corporate governance at a crossroads.R. (1997). A survey of corporate governance. The Journal ofCorporate Governance, the Environment, and the Internet Jane

Andrew, Jane

2003-01-01T23:59:59.000Z

85

Lesson from Fiascos in Russian Corporate Governance  

E-Print Network [OSTI]

Cause Corporate Governance Failures . . . . . . . . . 1.understanding of how corporate governance works. See Heller,Shareholders in Corporate Governance (1999) (mimeo on file

Fox, Merritt; Heller, Michael

2000-01-01T23:59:59.000Z

86

Lesson from Fiascos in Russian Corporate Governance  

E-Print Network [OSTI]

Cause Corporate Governance Failures . . . . . . . . . 1.understanding of how corporate governance works. See Heller,Shareholders in Corporate Governance (1999) (mimeo on file

Fox, Merritt B.; Heller, Michael A.

1999-01-01T23:59:59.000Z

87

Capital Structure Implications for Corporate Governance  

E-Print Network [OSTI]

A. R¨oell, 2002, “Corporate governance and control,” ECGI-Enjoying the quiet life? Corporate governance and managerialGrinstein, 2007, “Corporate governance and firm value: The

Rajan, Nishanth

2012-01-01T23:59:59.000Z

88

Corporate Law, Social Norms and Belief Systems  

E-Print Network [OSTI]

fiduciary duties, corporate governance, and takeovers (Partinvestors in corporate governance. Often, the operation ofthe ALI’s Principles of Corporate Governance provides that a

Eisenberg, Melvin

1999-01-01T23:59:59.000Z

89

Sustainable Energy Dam: research into possible improvement of dam/dike safety by application of sustainable energy on dams/dikes:.  

E-Print Network [OSTI]

??A study on the use of the Afsluitdijk (or more generic, enclosure dams in general) for the generation of energy. Focus in this study in… (more)

Wondergem, D.

2008-01-01T23:59:59.000Z

90

UBC Social Ecological Economic Development Studies (SEEDS) Student Report Whole Building Life Cycle Assessment: Three Olympic Venues  

E-Print Network [OSTI]

Ice and Sledge Hockey Events Home of the UBC Thunderbirds Hockey Teams BACKGROUND #12;Thunderbird Winter Sports Center Originally opened in 1963 Expanded in 1968/1969 3 full-size rinks, curling arena was retained by the Doug Mitchell Center and used as a practice rink for the Olympics BACKGROUND #12

91

Corporate governance and insider trading  

E-Print Network [OSTI]

I investigate the relation between corporate governance and insider trading by corporate executives. Despite the general view that trade on non-public information adversely affects capital market participants, the impact ...

Rozanov, Konstantin A

2008-01-01T23:59:59.000Z

92

Corporate governance and banking regulation  

E-Print Network [OSTI]

The globalisation of banking markets has raised important issues regarding corporate governance regulation for banking institutions. This research paper addresses some of the major issues of corporate governance as it relates to banking regulation...

Alexander, Kern

93

North American Electric Reliability Corporation Interconnections...  

Office of Environmental Management (EM)

North American Electric Reliability Corporation Interconnections North American Electric Reliability Corporation Interconnections Map of the North American Electric Reliability...

94

Forestry Commission England Corporate Plan  

E-Print Network [OSTI]

Forestry Commission England Corporate Plan 2011-15 This is the Corporate Plan for the Forestry Commission in England. It is one of a suite of plans including those for Forestry Commission (GB) and Forest Research. Page 1Forestry Commission England Corporate Plan 2011-15 #12;Page 2Forestry Commission England

95

Press Release Corporate Communications  

E-Print Network [OSTI]

Page: 1/2 Press Release Corporate Communications Karolinenplatz 5 D-64289 Darmstadt Germany Your.ch@pvw.tu- darmstadt.de Internet: http://www.tu- darmstadt.de/presse e-mail: presse@tu-darmstadt.de On Cloud Nine TU). She intends to use the funding for basic research into the programming of software that will be fit

Haller-Dintelmann, Robert

96

CORPORATIONS APAC Tennessee Incorporated  

E-Print Network [OSTI]

Services Deal Cooper Holton PLLC Design Details A.C.A.P. - The Care Foundation Devault Interactive Deweese of Jacksonville Inc. FedEx Corporation First South Financial Credit Union First Tennessee Bank First Tennessee and Music Publishing LLC Macmillan Subscription Services Magnolia Processing Inc Mr. Chris Marable Marsh

Dasgupta, Dipankar

97

Corporate and personal responsibility  

SciTech Connect (OSTI)

Socioeconomic aspects of global climate change are discussed in this paper. Behavioral dimensions are discussed, with a focus on individual and collective value systems. It is suggested that traditional values are not adequate for addressing the climate change issue. Social aspects of the corporate role in climatic change are also briefly discussed.

Jemieson, D. [Univ. of Colorado, Boulder, CO (United States)

1992-12-31T23:59:59.000Z

98

Modeling the costs and benefits of dam construction from a multidisciplinary perspective  

E-Print Network [OSTI]

, energy, and environmental protection well into the future, a broader view of dams is needed. We thus and to articulate priorities associated with a dam project, making the decision process about dams more informed dams, the next generation may witness a renewed intensity in large dam development in the U.S. More

Tullos, Desiree

99

Title 33 USC 401 Construction of Bridges, Causeways, Dams or...  

Open Energy Info (EERE)

Reference LibraryAdd to library Legal Document- StatuteStatute: Title 33 USC 401 Construction of Bridges, Causeways, Dams or Dikes Generally; ExemptionsLegal Abstract Section...

100

EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement...  

Broader source: Energy.gov (indexed) [DOE]

Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA's proposed action was to fund the project. PUBLIC COMMENT...

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

A climatology, synoptic assessment, and thermodynamic evaluation for cloud-to-ground lightning in Georgia: a study for the 1996 Summer Olympics  

E-Print Network [OSTI]

A lightning climatology within 50 km of nine outdoor venue locations for the 1996 Summer Olympics is produced. Spatial and temporal patterns were analyzed for July and August from 1986 to 1993. Active and inactive lightning days were isolated...

Livingston, Eric Scott

1995-01-01T23:59:59.000Z

102

Japanese Corporate Governance: The Hidden Problems of the Corporate Law and Their Solutions  

E-Print Network [OSTI]

norm. Japanese Corporate Governance: The Hidden Problems ofsame time. Arguments on corporate governance can be dividedinto two types: corporate governance in the narrow sense and

Shishido, Zenichi

1999-01-01T23:59:59.000Z

103

Dams and Energy Sectors Interdependency Study  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy CooperationRequirements Matrix DOE-STD-3009-2014ofOutline of RemarksType text] Dams and

104

Milner Dam Wind Park | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's HeatMexico: Energy Resources JumpMicrelBirds JumpMilner Dam Wind Park Jump to:

105

McNary Dam hits the rewind  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region serviceMissionreal-timeMaRIEMcNary-Dam-hits-the-rewind Sign In About |

106

Potential Geomorphic and Ecological Impacts of Marmot Dam Removal, Sandy River, OR  

E-Print Network [OSTI]

Marmot Dam is a 13-meter (42 ft) high hydroelectric diversion dam on the Sandy River that is owned Run Hydroelectric project and began the process of creating a decommissioning plan for the dam

107

The Downstream Geomorphic Effects of Dams: A Comprehensive and Comparative Approach  

E-Print Network [OSTI]

Framework for Interpreting Downstream Effects of Dams onF. and N. Shin, 2001. The downstream effects of dams on theG.P. and M.G. Wolman, 1984. Downstream Effects of Dams on

Minear, Justin Toby

2010-01-01T23:59:59.000Z

108

The distribution of dams in Costa Rica and their hydrologic impacts  

E-Print Network [OSTI]

Dam construction has increased exponentially over the past century, primarily in temperate environments. While the impacts of dams in temperate regions have been well-documented, a parallel level of research on dam impacts has not been achieved...

Laurencio, Laura Richards

2006-04-12T23:59:59.000Z

109

Industrial Analytics Corporation  

SciTech Connect (OSTI)

The lost foam casting process is sensitive to the properties of the EPS patterns used for the casting operation. In this project Industrial Analytics Corporation (IAC) has developed a new low voltage x-ray instrument for x-ray radiography of very low mass EPS patterns. IAC has also developed a transmitted visible light method for characterizing the properties of EPS patterns. The systems developed are also applicable to other low density materials including graphite foams.

Industrial Analytics Corporation

2004-01-30T23:59:59.000Z

110

Benchmarking Corporate Energy Management  

E-Print Network [OSTI]

BENCHMARKING CORPORATE ENERGY MANAGEMENT Dr. Douglas L. Norland Director of Research and Industrial Programs Alliance to Save Energy Washington, DC ABSTRACT There is growing interest among energy managers in finding out how their company...'s energy management procedures and perfonnance compare to that of other companies. Energy management involves everything from setting goals and targets to implementing best maintenance practices. This paper, however, discusses benchmarking energy...

Norland, D. L.

111

A DETAILED RESEARCH PLAN TO ASSESS BEHAVIOR OF ADULT SUMMER/FALL CHINOOK UPSTREAM OF WELLS DAM USING  

E-Print Network [OSTI]

........................................................................ 11 3.6.3 Chief Joseph Dam Powerhouse

112

Financial Analysis of Experimental Releases Conducted at Glen Canyon Dam  

E-Print Network [OSTI]

Department of Energy Western Area Power Administration #12;ii FOREWORD This report was prepared by Argonne Canyon Dam (GCD) conducted for the U.S. Department of Energy's Western Area Power Administration (Western. The facilities known collectively as the Salt Lake City Area Integrated Projects include dams equipped for power

Kemner, Ken

113

GEOSYNTHETIC DAM LINING SYSTEMS By: Christine T. Weber1  

E-Print Network [OSTI]

of geosynthetic liners for dams involves heads much larger than those in environmental applications. Accordingly. Geosynthetics have been used in a large number of geotechnical, transportation, environmental and hydraulic and industrial use. As dams age, deterioration and structural damage are of major concern as they can lead

Zornberg, Jorge G.

114

Processes affecting the spatial and temporal variability of methane in a temperate dammed river system  

E-Print Network [OSTI]

gas emissions from a hydroelectric reservoir (Brazil’sgas emissions from hydroelectric dams: controversies provideP. M. , 2005a. Do hydroelectric dams mitigate global

Bilsley, Nicole A.

2012-01-01T23:59:59.000Z

115

US Society on Dams Annual Conference, March 2007, Philadelphia, Pennsylvania TOLERABLE RISK FOR DAMS: HOW SAFE IS SAFE ENOUGH?  

E-Print Network [OSTI]

and value judgements. ICOLD (2005) ABSTRACT Risk assessment provides an opportunity to manage dam safety for the tolerability of risk developed by the UK Health and Safety Executive (HSE) is summarized. The important role and Environmental Engineering and Director, Institute for Dam Safety Risk Management, Utah State University, Logan

Bowles, David S.

116

Phase 1: Dam, Lake, and Wetland The project's first phase was a dam and stormwater impoundment to control  

E-Print Network [OSTI]

. Phase 3: Constructed Treatment Wetland (not publicly accessible) Six stormwater wetland cells surround Phase 1: Dam, Lake, and Wetland The project's first phase was a dam and stormwater impoundment to control surface water and groundwater hydrology. The surrounding wetlands were restored

117

Incorporating Sustainability into Brownfield Remediation and Redevelopment in Mega-project: Experience and Lessons Learnt at the London Olympic Park  

E-Print Network [OSTI]

network established in 2007 in the UK) and CL:AIRE (Contaminated Land: Applications in Real Environments - a UK not-for-profit organisation founded in 1999), sustainable remediation is defined as ‘‘remediation that eliminates and/or controls... D, CEng, FICE Professor at University of Cambridge Jan Hellings, MBA, PhD, DIC, MSc, CEng, FICE former Project Sponsor at Olympic Delivery Authority Keyword: Pollution, Sustainability, Land reclamation Page 2 of 16 ABSTRACT The 2012 London...

Hou, Deyi; Al-Tabbaa, Abir; Hellings, Jan

2014-01-01T23:59:59.000Z

118

Corporate Board Meeting Minutes  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartmentSmart GridThird Quarter OverallDepartmentSpaceDebateCorporate

119

Corporate and Foundation Proposal Checklist  

E-Print Network [OSTI]

Corporate and Foundation Proposal Checklist For additional information or assistance, please contact the MSU Foundation Office of Corporate and Foundation Relations at 994-2522 MSU Mission Statement MSU Foundation Mission Statement Needs Statement States the need using hard-core statistics

Dyer, Bill

120

The Farm and Ranch Corporation.  

E-Print Network [OSTI]

rooc - ~ TA245.7 1873 0.1302 The Texas A&M University System Texas Agricultural Extension Service 8-1302 Director Daniel C. Pfannstiel College Station, Texas 77843 The Farm and Ranch Corporation Farm and Ranch Busin 0 nization... in Texas CONTENTS Alternative Forms of Business Organization. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 3 Closely Held Farm Corporations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 4...

Brints, Norman; Sartin, Marvin

1980-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Siemens Pittsburgh, PA Novelis Corporation Atlanta, GA  

E-Print Network [OSTI]

Industrial Design ­ Shanghai, China Eaton Corporation ­ Pittsburgh, PA CMU, CTTEC ­ PittsburghSiemens ­ Pittsburgh, PA Novelis Corporation ­ Atlanta, GA Expense

McGaughey, Alan

122

Quantifying and Generalizing Hydrologic Responses to Dam Regulation using a Statistical Modeling Approach  

SciTech Connect (OSTI)

Despite the ubiquitous existence of dams within riverscapes, much of our knowledge about dams and their environmental effects remains context-specific. Hydrology, more than any other environmental variable, has been studied in great detail with regard to dam regulation. While much progress has been made in generalizing the hydrologic effects of regulation by large dams, many aspects of hydrology show site-specific fidelity to dam operations, small dams (including diversions), and regional hydrologic regimes. A statistical modeling framework is presented to quantify and generalize hydrologic responses to varying degrees of dam regulation. Specifically, the objectives were to 1) compare the effects of local versus cumulative dam regulation, 2) determine the importance of different regional hydrologic regimes in influencing hydrologic responses to dams, and 3) evaluate how different regulation contexts lead to error in predicting hydrologic responses to dams. Overall, model performance was poor in quantifying the magnitude of hydrologic responses, but performance was sufficient in classifying hydrologic responses as negative or positive. Responses of some hydrologic indices to dam regulation were highly dependent upon hydrologic class membership and the purpose of the dam. The opposing coefficients between local and cumulative-dam predictors suggested that hydrologic responses to cumulative dam regulation are complex, and predicting the hydrology downstream of individual dams, as opposed to multiple dams, may be more easy accomplished using statistical approaches. Results also suggested that particular contexts, including multipurpose dams, high cumulative regulation by multiple dams, diversions, close proximity to dams, and certain hydrologic classes are all sources of increased error when predicting hydrologic responses to dams. Statistical models, such as the ones presented herein, show promise in their ability to model the effects of dam regulation effects at large spatial scales as to generalize the directionality of hydrologic responses.

McManamay, Ryan A [ORNL

2014-01-01T23:59:59.000Z

123

Experimental Study on Impact Load on a Dam Due to Debris Flow1  

E-Print Network [OSTI]

as a fluid hits the dam (fluid impact load). The former tends to cause partial break of the concrete damExperimental Study on Impact Load on a Dam Due to Debris Flow1 lwao Miyoshi2 ABSTRACT When a dam is struck by mud or debris flow, it is put under a great impact load and sometimes is destroyed. To prevent

Standiford, Richard B.

124

TSSGNEO suggestions for refinement of safety criteria for dam at the Sayano-Shushenskaya HPP  

SciTech Connect (OSTI)

Analysis of radial-displacements of the dam, measured by direct and inverted plumb lines, indicates that curves of the variation in radial displacements of the dam at different elevations make it possible to plot diagrams of increases in the radial displacement over the entire height of the dam, i.e., inclines of the axis of the dam to the vertical.

Savich, A. I.; Gaziev, E. G. [Expert Commission on Assessment of the 'Dam - Bed' System at the Sayano-Shushenskaya HPP (Russian Federation)] [Expert Commission on Assessment of the 'Dam - Bed' System at the Sayano-Shushenskaya HPP (Russian Federation)

2013-09-15T23:59:59.000Z

125

DOWNSTREAM CHANNEL CHANGES AFTER A SMALL DAM REMOVAL: USING AERIAL PHOTOS AND MEASUREMENT ERROR FOR CONTEXT;  

E-Print Network [OSTI]

DOWNSTREAM CHANNEL CHANGES AFTER A SMALL DAM REMOVAL: USING AERIAL PHOTOS AND MEASUREMENT ERROR to assess downstream channel changes associated with a small dam removal. The Brownsville Dam, a 2.1 m tall downstream from the dam and in an upstream control reach using aerial photos (1994­2008) and in the field

Tullos, Desiree

126

Route-Specific Passage Proportions and Survival Rates for Fish Passing through John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011  

SciTech Connect (OSTI)

This report fulfills a request of the U.S. Army Engineer District, Portland, Oregon, to produce an interim report of estimates of route-specific fish passage proportions and survival rates for lower Columbia River dams in 2010 and 2011. The estimates are needed to update the Compass Model for the Columbia River Treaty and the new Biological Opinion before detail technical reports are published in late 2012. This report tabulates route-specific fish-passage proportions and survival rates for steelhead and Chinook salmon smolts passing through various sampled routes at John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011. Results were compiled from analyses of data acquired in spring 2010 and 2011 studies that were specifically designed to estimate dam-passage and forebay-to-tailrace survival rates, travel time metrics, and spill passage efficiency, as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the Columbia Basin Fish Accords. The study designs allowed for estimation of route-specific fish passage proportions and survival rates as well as estimation of forebay-passage survival, all of which are summarized herein.

Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

2012-06-04T23:59:59.000Z

127

CARL J. BAUER* Dams and Markets: Rivers and  

E-Print Network [OSTI]

a variety of new thermal power plants.3 The proposed dams in Patagonia have gotten the headlines and caused the most public conflict, both within Chile and internationally.4 Patagonia is the rugged and remote region

128

Rules and Regulations for Dam Safety (Rhode Island)  

Broader source: Energy.gov [DOE]

These rules and regulations seek to provide for the safety of dams to protect the public, real property, and natural resources by establishing reasonable standards and creating a public record for...

129

Regulation of Dams and Bridges Affecting Navigable Waters (Wisconsin)  

Broader source: Energy.gov [DOE]

Chapter 31 of the Wisconsin Statutes lays out the regulations relevant to dams and bridges on or near navigable waters. This statute establishes that the Department of Natural Resources has...

130

Power benefits of the lower Snake River dams - FACT SHEET  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

dams to have been built in the Federal Columbia River Power System. The FCRPS is the largest source of electricity in the Pacifi c Northwest and the largest source of renewable...

131

Travertine Deposits of Soda Dam, New Mexico, and Their Implications...  

Open Energy Info (EERE)

Travertine Deposits of Soda Dam, New Mexico, and Their Implications for the Age and Evolution of the Valles Caldera Hydrothermal System Jump to: navigation, search OpenEI Reference...

132

Temporary Restoration of Bull Trout Passage at Albeni Falls Dam  

SciTech Connect (OSTI)

This study was designed to monitor movements of bull trout that were provided passage above Albeni Falls Dam, Pend Oreille River. Electrofishing and angling were used to collect bull trout below the dam. Tissue samples were collected from each bull trout and sent to the U. S. Fish and Wildlife Service Abernathy Fish Technology Center Conservation Genetics Lab, Washington. The DNA extracted from tissue samples were compared to a catalog of bull trout population DNA from the Priest River drainage, Lake Pend Oreille tributaries, and the Clark Fork drainage to determine the most probable tributary of origin. A combined acoustic radio or radio tag was implanted in each fish prior to being transported and released above the dam. Bull trout relocated above the dam were able to volitionally migrate into their natal tributary, drop back downstream, or migrate upstream to the next dam. A combination of stationary radio receiving stations and tracking via aircraft, boat, and vehicle were used to monitor the movement of tagged fish to determine if the spawning tributary it selected matched the tributary assigned from the genetic analysis. Seven bull trout were captured during electrofishing surveys in 2008. Of these seven, four were tagged and relocated above the dam. Two were tagged and left below the dam as part of a study monitoring movements below the dam. One was immature and too small at the time of capture to implant a tracking tag. All four fish released above the dam passed by stationary receivers stations leading into Lake Pend Oreille and no fish dropped back below the dam. One of the radio tags was recovered in the tributary corresponding with the results of the genetic test. Another fish was located in the vicinity of its assigned tributary, which was impassable due to low water discharge at its mouth. Two fish have not been located since entering the lake. Of these fish, one was immature and not expected to enter its natal tributary in the fall of 2008. The other fish was large enough to be mature, but at the time of capture its sex was unable to be determined, indicating it may not have been mature at the time of capture. These fish are expected to enter their natal tributaries in early summer or fall of 2009.

Paluch, Mark; Scholz, Allan; McLellan, Holly [Eastern Washington University Department of Biology; Olson, Jason [Kalispel Tribe of Indians Natural Resources Department

2009-07-13T23:59:59.000Z

133

Hindawi Publishing Corporation PPAR Research  

E-Print Network [OSTI]

Hindawi Publishing Corporation PPAR Research Volume 2006, Article ID 27489, Pages 1­9 DOI 10 these two phenotypes and makes them inseparable [2, 3]. According to the shared precursor hypoth- esis

Abraham, Nader G.

134

Corporate Jobs Tax Credit (Louisiana)  

Broader source: Energy.gov [DOE]

Corporate Jobs Tax Credit is a one-time tax credit ranging from up to $225 for each net new permanent job created as the result of a new business start-up or the expansion of an existing one. ...

135

Sustainable Building Tax Credit (Corporate)  

Broader source: Energy.gov [DOE]

SB 463, enacted in April 2007, established a personal tax credit and a corporate tax credit for sustainable buildings in New Mexico. The tax credits apply to both commercial and residential...

136

Power Reliability at BASF Corporation  

E-Print Network [OSTI]

Power Reliability at BASF Corporation Thomas R. Theising Energy Systems Manager BASF Corporation ABSTRACT: Quality is defined not as what the supplier puts into the product but what the customer gets out and is willing to pay for. Power... of overcoming these problems. The approach of addressing the reliability of its utility systems is common within BASF. This paper will address one of BASF?s approaches to addressing Power Reliability. PROBLEM RECOGNITION: The first issue to address...

Theising, T. R.

2011-01-01T23:59:59.000Z

137

Power Reliability at BASF Corporation  

E-Print Network [OSTI]

Power Reliability at BASF Corporation Thomas R. Theising Energy Systems Manager BASF Corporation ABSTRACT: Quality is defined not as what the supplier puts into the product but what the customer gets out and is willing to pay for. Power... of overcoming these problems. The approach of addressing the reliability of its utility systems is common within BASF. This paper will address one of BASF?s approaches to addressing Power Reliability. PROBLEM RECOGNITION: The first issue to address...

Theising, T. R.

2012-01-01T23:59:59.000Z

138

Tax aspects of collapsible corporations  

E-Print Network [OSTI]

TAX ASPECTS OF COLLAPSIBLE CORPORATIONS A Thesis By HERMAN AUGUST LEHMANN Submitted to the Graduate School of the Agricultural and 14 echanical College of Texas in partial fulfillment of the requirements for the degree of MASTER OF BUSINESS... his sincere appreciation for the guidance and assistance rendered by Professor Thomas Vi'. Leland in the preparation of this thesis. TABLE OF CONTENTS Chapter Page I. INTRODUCTION II. PROBLEMS RELATING TO COLLAPSIBLE CORPORATIONS Definition...

Lehmann, Herman August

2012-06-07T23:59:59.000Z

139

abolishes corporate income: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5, 2014 12;Corporate Affiliates Chairman: Mark Ambrose San Diego Site Executive, Raytheon 12;Corporate Affiliates Program Welcome New CAP Members 12;Corporate Affiliates...

140

abolishing corporate income: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5, 2014 12;Corporate Affiliates Chairman: Mark Ambrose San Diego Site Executive, Raytheon 12;Corporate Affiliates Program Welcome New CAP Members 12;Corporate Affiliates...

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Culture, Law, and Finance: Cultural Dimensions of Corporate Governance Laws  

E-Print Network [OSTI]

Protection and Corporate Governance, 58 J. Fin. Econ.the legal approach to corporate governance by presenting newlegal rules of corporate governance. 5 The need to take

Licht, Amir N.; Goldschmidt, Chanan; Schwartz, Shalom H.

2001-01-01T23:59:59.000Z

142

Corporate Governance, State-Contingent Control Rights, and Financial Distress  

E-Print Network [OSTI]

20-6:00 pm, Boalt 13 Corporate Governance, State-ContingentRobert K. Rasmussen Corporate Governance, State-ContingentTraditional accounts of corporate governance focus on how

Rasmussen, Robert K.

2004-01-01T23:59:59.000Z

143

U.S. Style Corporate Governance in Korea's Largest Companies  

E-Print Network [OSTI]

E.g. , D. Gordon Smith, Corporate Governance and ManagerialPrinciples of Corporate Governance, http://www.oecd.orgdaf/Bank/OECD Global Corporate Governance Forum, Washington

Ehrlich, Craig; Kang, Dae-Seob

2000-01-01T23:59:59.000Z

144

Corporate Social Responsibility as a Conflict Between Owners  

E-Print Network [OSTI]

Metrick, 2003, Corporate governance and equity prices,to link CSR with corporate governance. Arguably this linkexpenditure and good corporate governance mechanisms are to

Rubin, Amir

2005-01-01T23:59:59.000Z

145

How Big a Problem is U.S. Corporate Governance?  

E-Print Network [OSTI]

suggests that poor corporate governance or managerial powertheories argue that corporate governance deteriorated in thestealing CEOs or poor corporate governance cannot possibly

Kaplan, Steve

2007-01-01T23:59:59.000Z

146

Choice as Regulatory Reform: The Case of Japanese Corporate Governance  

E-Print Network [OSTI]

Globalization of Corporate Governance: Convergence of Formthe idea that U.S. corporate governance was a model for AsiaWoochan Kim, Does Corporate Governance Predict Firms’ Market

Milhaupt, Curtis

2004-01-01T23:59:59.000Z

147

Nuclear Safety Enforcement Letter issued to Sandia Corporation...  

Broader source: Energy.gov (indexed) [DOE]

Enforcement Letter issued to Sandia Corporation Nuclear Safety Enforcement Letter issued to Sandia Corporation 9222014 Enforcement Letter, Sandia Corporation, September 22, 2014...

148

Karnataka Power Corporation Limited and National Thermal Power...  

Open Energy Info (EERE)

Limited and National Thermal Power Corporation JV Jump to: navigation, search Name: Karnataka Power Corporation Limited and National Thermal Power Corporation JV Place: India...

149

Steffes Corporation Smart Grid RFI: Addressing Policy and Logistical...  

Broader source: Energy.gov (indexed) [DOE]

Steffes Corporation Smart Grid RFI: Addressing Policy and Logistical Challenges Steffes Corporation Smart Grid RFI: Addressing Policy and Logistical Challenges Steffes Corporation...

150

The Sensor Fish - Making Dams More Salmon-Friendly  

SciTech Connect (OSTI)

This article describes the Sensor Fish, an instrument package that travels through hydroelectric dams collecting data on the hazardous conditions that migrating salmon smolt encounter. The Sensor Fish was developed by Pacific Northwest National Laboratory with funding from DOE and the US Army Corps of Engineers and has been used at several federal and utility-run hydroelectric projects on the Snake and Columbia Rivers of the US Pacific Northwest. The article describes the evolution of the Sensor Fish design and provides examples of its use at McNary and Ice Harbor dams.

Carlson, Thomas J.; Duncan, Joanne P.; Gilbride, Theresa L.; Keilman, Geogre

2004-07-31T23:59:59.000Z

151

E-Print Network 3.0 - arch dams Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

infectious secretions from both the vagina and anus, the dental dam is a popular safer sex tool. Dental dams... now come in different colors, scents, sizes and even flavors How...

152

E-Print Network 3.0 - analysis model dam Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

water from Yongdam Dam. The advantages of a model such as the one... , irrigation, hydropower, and recreation. Two major dams are ... Source: Kim, Young-Oh - Department of Civil...

153

E-Print Network 3.0 - arch dams including Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

part of the East Branch Dam Safety Initiative in Elk County, Pa. The site development work went to Tab... seepage-related dam safety concerns at East Branch Clarion River Lake in...

154

Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012  

SciTech Connect (OSTI)

The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

2013-05-01T23:59:59.000Z

155

Matching Gift Companies LEHIGH UNIVERSITY 1 3M Corporation  

E-Print Network [OSTI]

Corporation Foundation The Eaton Charitable Fund Electroline Corporation Eli Lilly and Company FoundationMatching Gift Companies LEHIGH UNIVERSITY 1 3M Corporation Abbott Laboratories Accenture Foundation Technologies, Inc. Air Products Air Products Foundation Albemarle Corporation Alcoa Foundation Alliance Capital

Gilchrist, James F.

156

The Market for Borrowing Corporate Bonds  

E-Print Network [OSTI]

This paper describes the market for borrowing corporate bonds using a comprehensive data set from a major lender. The cost of borrowing corporate bonds is comparable to the cost of borrowing stock, between 10 and 20 basis ...

Asquith, Paul

157

Corporate governance : the case for Asian REITs  

E-Print Network [OSTI]

At the entity level, the design of sound corporate governance mechanisms is critical for REITs that are preparing to go public. At the industry level, issues of transparency and corporate governance are consequential to ...

Tan, Denise, S.M. Massachusetts Institute of Technology

2009-01-01T23:59:59.000Z

158

Corporate Headquarters Tax Credit (West Virginia)  

Broader source: Energy.gov [DOE]

The Corporate Headquarters Tax Credit is available to companies who relocate their corporate headquarters to West Virginia and create 15 new jobs. The credit can offset up to 100% of the tax...

159

CORPORATE SUSTAINABILITY, STRATEGY AND ACCOUNTING CONTROLS: AN  

E-Print Network [OSTI]

PRACTICES Nathalie CRUTZEN, Dr, Assistant Professor, Accenture Chair in Sustainable Strategy, HEC support the implementation of a sustainability strategy in practice. With reference to Malmi and Brown 1 CORPORATE SUSTAINABILITY, STRATEGY AND ACCOUNTING CONTROLS: AN EXPLORATION OF CORPORATE

Boyer, Edmond

160

Corporate decision analysis : an engineering approach  

E-Print Network [OSTI]

We explore corporate decisions and their solutions under uncertainty using engineering methods. Corporate decisions tend to be complex; they are interdisciplinary and defy programmable solutions. To address these challenges, ...

Tang, Victor, Ph.D. Massachusetts Institute of Technology

2006-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Green River Lake and Dam interim plan benefits ecosystem By John Hickey  

E-Print Network [OSTI]

11 Green River Lake and Dam interim plan benefits ecosystem By John Hickey Hydrologic Engineering that water is released from Green River Dam in Kentucky. In May 2006, the interim plan was approved shown that operation of Green River Dam can be changed in ways that improve ecosystems while continuing

US Army Corps of Engineers

162

Effect of Flow Pulses on Degradation Downstream of Hapcheon Dam, South Korea  

E-Print Network [OSTI]

Effect of Flow Pulses on Degradation Downstream of Hapcheon Dam, South Korea Young Ho Shin1 and Pierre Y. Julien, M.ASCE2 Abstract: The changes in channel geometry downstream of Hapcheon Dam, South: Channels; Geometry; Dams; Korea, South; Sediment transport. Author keywords: Alluvial channels; Downstream

Julien, Pierre Y.

163

STUDY OF LOSS AND DELAY OF SALMON PASSING ROCK ISLAND DAM, COLUMBIA RIVER, 1954-56  

E-Print Network [OSTI]

). Six new generating unit.s were added in t.he powerhouse (locat.ed on the left. side of t.he dam returns from below and above dam releases were compared; data failed to show that the dam caused losses

164

Research Article Effects of Alpine hydropower dams on particle transport and  

E-Print Network [OSTI]

Research Article Effects of Alpine hydropower dams on particle transport and lacustrine December 2006 Abstract. The effects of high-alpine hydropower damming on lacustrine sedimentation impact, such as by hydropower dam construction that form artifi- cial sediment sinks acting as manmade

Gilli, Adrian

165

Proceedings of the Australian Committee on Large Dams Conference, Melbourne, Victoria, Australia. November 2004  

E-Print Network [OSTI]

Proceedings of the Australian Committee on Large Dams Conference, Melbourne, Victoria, Australia. November 2004 ANCOLD 2004 Conference Page 1 TRANSPORTATION MODEL FOR EVACUATION IN ESTIMATING DAM FAILURE and requiring only a reasonable level of effort to #12;Proceedings of the Australian Committee on Large Dams

Bowles, David S.

166

Corporate Productivity and I/S Investment  

E-Print Network [OSTI]

EG&G Inc. Enron Corp. Entergy Corporation Equitable LifeDuke Power Co. Enron Corp. Entergy Servies Florida Power &

Kraemer, Kenneth L.; Dunkle, Debbie

1997-01-01T23:59:59.000Z

167

Energy Conservation in China North Industries Corporation  

E-Print Network [OSTI]

ENERGY CONSERVATION IN CHINA NORTH INDUSTRIES CORPORATION Wang Tian You, Chen Hua De, Jing Xing Chu, Ling Rui Fu, China North Industries Corporation Beijing, People's Republic of China ABSTRACT This paper describes an overview of the energy... conservation in China North Industries Corporation. It shows how the corporation improves energy effi ciencies and how it changes constitution of fuel-- converting oil consumption to coal. Energy management organization, energy balance in plants...

You, W. T.; De, C. H.; Chu, J. X.; Fu, L. R.

168

Essays on the Market for Corporate Control  

E-Print Network [OSTI]

corporate governance play its role during this process? And why do managers often resist takeovers? The agency model this paper develops is compatible with existing theories on takeovers including neoclassical, inefficient stock market, and the free cash... .............................................................................................................. 72 IV CORPORATE GOVERNANCE DRIVEN TAKEOVERS ........................................... 82 1. The basic setting ................................................................................................. 82 2. Corporate...

Kim, Hyunjung

2011-02-22T23:59:59.000Z

169

IBM Research Zurich 2010 IBM Corporation  

E-Print Network [OSTI]

&D Budget>6 B $ #12;ETH PolyVortrag 2010 Jana Koehler5 IBM Research ­ Zurich © 2010 IBM Corporation IBM - Zurich #12;ETH PolyVortrag 2010 Jana Koehler8 IBM Research ­ Zurich © 2010 IBM Corporation Math;ETH PolyVortrag 2010 Jana Koehler9 IBM Research ­ Zurich © 2010 IBM Corporation Selected Projects #12

170

Dam-Breach Flood Wave Propagation Using Dimensionless Parameters  

E-Print Network [OSTI]

insight into the gamut of shallow water waves, including kinematic, diffusion, dynamic, and gravity wavesDam-Breach Flood Wave Propagation Using Dimensionless Parameters Victor M. Ponce, M.ASCE1 ; Ahmad Taher-shamsi2 ; and Ampar V. Shetty3 Abstract: An analytical model of flood wave propagation is used

Ponce, V. Miguel

171

James W. Van Dam US Burning Plasma Organization  

E-Print Network [OSTI]

scenarios, ... · Diagnostics ­ High time/space resolution, velocity distribution measurements, ... · Plasma · Toroidal Alfvén Eigenmodes · Internal plasma diagnostic #12;Page 12 USBPO · Plasma ions and electrons: ­ TiJames W. Van Dam US Burning Plasma Organization US ITER Project Office Institute for Fusion Studies

172

Optimization of Hydroacoustic Equipment Deployment at Foster Dam, 2013  

SciTech Connect (OSTI)

The goal of the study was to optimize performance of the fixed-location hydroacoustic systems at Foster Dam (FOS) by determining deployment and data acquisition methods that minimized structural, electrical, and acoustic interference. Optimization of the hydroacoustic systems will establish methodology for sampling by active acoustic methods during this year-long evaluation of juvenile salmonid passage at FOS.

Hughes, James S.; Johnson, Gary E.; Ploskey, Gene R.; Hennen, Matthew J.; Fischer, Eric S.; Zimmerman, Shon A.

2013-03-01T23:59:59.000Z

173

INCORPORATING UNCERTAINTY INTO DAM SAFETY RISK Sanjay S. Chauhan1  

E-Print Network [OSTI]

of Reclamation are using risk assessment as a decision support tool. This paper summarizes an approach to incorporating input uncertainties into risk analysis model. Input uncertainties are captured by using for uncertainty analysis in dam safety risk assessment, and demonstrates some useful formats for presenting

Chauhan, Sanjay S.

174

Corporate Partners with industry to  

E-Print Network [OSTI]

, and a place to search for solutions. Corporate Partner Induct SARL, a French company, sponsored several that meet your company's needs. UCR's College of Engineering ­ Center for Environmental Research'sorcenter'sAdvisoryCouncil · Namedgraduatefellowshipinareaofspecialinterest · Directconnectiontodepartment'sorcenter'sChairorDirector · Company

175

Corporate Security and Conflict Outcomes  

E-Print Network [OSTI]

..................................................................................................... 75 Competition in Security Contracting and Conflict Outcomes .................................. 80 Research Design ....................................................................................................... 88 Dependent Variable... ................................... 16 Table 2 Contracted Service Total by Corporate Structure ............................................... 42 Table 3 The Effects of Public and Individual Firms Operating in Iraq (Part A) .............. 54 Table 4 The Effects of Public...

Tkach, Benjamin K

2013-10-21T23:59:59.000Z

176

Hindawi Publishing Corporation Prostate Cancer  

E-Print Network [OSTI]

Hindawi Publishing Corporation Prostate Cancer Volume 2011, Article ID 176164, 7 pages doi:10.1155/2011/176164 Clinical Study Effect of Zoledronic Acid on Bone Mineral Density in Men with Prostate Cancer Receiving cancer is well recognized. We assessed the effects of quarterly infusion of zoledronic acid on bone

Ahn, Hongshik

177

Internship opportunity with URS Corporation  

E-Print Network [OSTI]

Internship opportunity with URS Corporation URS is the largest global engineering design firm of undergraduate studies to participate in an internship program with the School of Ocean & Earth Science & Technology (SOEST) at the University of Hawaii. The intent of the internship is two-fold: · To establish

178

Monitoring of Olympic National Park Beaches to determine fate and effects of spilled bunker C fuel oil  

SciTech Connect (OSTI)

On December 23, 1988, the barge Nestucca was accidentally struck by its tow, a Souse Brothers Towing Company tug, releasing approximately 230,000 gallons of Bunker C fuel oil and fouling beaches from Grays Harbor north to Vancouver Island. Affected beaches in Washington included a 40-mile-long strip that has been recently added to Olympic National Park. The purpose of the monitoring program documented in this report was to determine the fate of spilled Bunker C fuel oil on selected Washington coastal beaches. We sought to determine (1) how much oil remained in intertidal and shallow subtidal habitats following clean-up and weathering, (2) to what extent intertidal and/or shallow subtidal biotic assemblages have been contaminated, and (3) how rapidly the oil has left the ecosystem. 45 refs., 18 figs., 8 tabs.

Strand, J.A.; Cullinan, V.I.; Crecelius, E.A.; Fortman, T.J.; Citterman, R.J.; Fleischmann, M.L.

1990-10-01T23:59:59.000Z

179

Compliance Monitoring of Subyearling Chinook Salmon Survival and Passage at The Dalles Dam, Summer 2012  

SciTech Connect (OSTI)

The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at The Dalles Dam during summer 2012. Under the 2008 Federal Columbia River Power System Biological Opinion, dam passage survival is required to be greater than or equal to 0.93 and estimated with a standard error (SE) less than or equal to 0.015. The study also estimated survival from the forebay 2 km upstream of the dam and through the tailrace to 2 km downstream of the dam, forebay residence time, tailrace egress time, spill passage efficiency (SPE), and fish passage efficiency (FPE), as required by the 2008 Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Johnson, Gary E.

2013-05-01T23:59:59.000Z

180

Enlargement of concrete blocks of arch dams with allowance of the formation of radial thermal cracks  

SciTech Connect (OSTI)

Considerable acceleration of the construction of arch dams with the use of highly productive continuous concreting mechanisms is possible with enlargement of the blocks and allowance of the formation of thermal radial cracks in them. A theoretical analysis and the results of on-site observations show that under the effect of the hydrostatic head of water, radial joints and cracks in compressed zones of an arch dam close and the dam in these zones works as a solid dam. Thermal cracking in concrete blocks of arch dams enlarged in plan should be controlled by making radial notches to concentrate tensile stresses providing the formation of radial cracks at prescribed places and through the usual methods of thermal regulation. The block size along the face of an arch dam is then no longer limited by the condition of crack resistance but is determined by the rate of concreting. The technical and economic effects from concreting arch dams are cited.

Verbetskii, G.P.; Chogovadze, G.I.; Daneliya, A.I.

1988-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

BASF Corporate Energy Management Process  

E-Print Network [OSTI]

Process 2 2 ? Brief introduction to BASF ? BASF Corporate Energy Management ? Management Support ? Goals ? Continuous Improvement ? Knowledge Sharing ? Recognition ESL-IE-14-05-30 Proceedings of the Thrity-Sixth Industrial Energy Technology Conference... • 2013 Sales: €74 Billion • Employees: 112,000 Company overview BASF – The Chemical Company 3 ESL-IE-14-05-30 Proceedings of the Thrity-Sixth Industrial Energy Technology Conference New Orleans, LA. May 20-23, 2014 Structure of BASF’s segments...

Geiger, T.

2014-01-01T23:59:59.000Z

182

Ampulse Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergyCT Biomass Facility Jump to: navigation,Amherst,Ampulse Corporation

183

Ryokuseisha Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to: navigation, searchVirginiaRoosevelt GardensUK-basedRutherford isRyokuseisha Corporation

184

Itochu Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429 Throttled (botOpen Energy2005) | OpenIssaquenaItochu Corporation Jump to:

185

Singapore's Economic Balancing Act: How a Company's Collapse Challenged the Country's New Corporate Governance Regime  

E-Print Network [OSTI]

THE COUNTRY'S NEW CORPORATE GOVERNANCE REGIME Sam RosemeON SINGAPORE'S CORPORATE GOVERNANCE REGIME . A.CORPORATE GOVERNANCE .. B. CHINA'S

Roseme, Sam

2007-01-01T23:59:59.000Z

186

Dam constructions as sealing systems in rock salt  

SciTech Connect (OSTI)

Dam constructions represent an essential component of the multibarrier safety concept in the Federal Republic of Germany for a repository of radioactive waste in salt formations. They enhance safety during the operational phase as well as in the post operational phase of the repository. In the framework of a joint R and D-project between BGR, DBE and GSF the components of a suitable dam have been developed and will be constructed and tested in the GSF-Asse salt mine in Lower-Saxony. The aims of the investigation program, its realization and some results on the development of construction materials will be presented and discussed. Experiences gained during these tests in laboratory and in situ will be described.

Engelmann, H.J.; Bollingerfehr, W.; Fischer, H. [Deutsche Gesellschaft zum Bau und Betrieb von Endlagern fuer Abfallstoffe mbH, Peine (Germany)

1993-12-31T23:59:59.000Z

187

Turbocharger with sliding piston, and having vanes and leakage dams  

DOE Patents [OSTI]

A turbocharger having a sliding piston for regulating exhaust gas flow into the turbine wheel includes a set of first vanes mounted on a fixed first wall of the turbine nozzle and projecting axially toward an opposite second wall of the nozzle, and/or a set of second vanes mounted on the end of the piston and projecting in an opposite axial direction toward the first wall of the nozzle. For the/each set of vanes, there are leakage dams formed on the wall that is adjacent the vane tips when the piston is closed. The leakage dams are closely adjacent the vane tips and discourage exhaust gas from leaking in a generally radial direction past the vane tips as the piston just begins to open from its fully closed position.

Roberts, Quentin (Nancy, FR); Alnega, Ahmed (Thaon Les Vosges, FR)

2011-12-06T23:59:59.000Z

188

Seismic safety of earth dams: A probabilistic approach  

SciTech Connect (OSTI)

The evaluation of the potential for slope sliding and/or liquefaction failure of earthen dams subjected to earthquake loadings is most often based on deterministic procedures of both the excitation input and of the physical model. Such treatment provides answers in the form of either factor of safety values or a yes or no as to whether liquefaction will occur or not. Uncertainties in the physical properties of the soil in the embankment and the foundation layers underlying the dam are typically treated with parametric studies. Consideration of probabilities pertaining to the uncertainties of the earthquake and of the site characterization is expected to augment the prediction of failure potential by associating slope and liquefaction failure to generic properties of the earthquake and of the site characterization. In this study, the procedures for conditional slope failure/liquefaction probabilities are formulated based on a series of simulated deterministic analyses of a dam cross section . These synthetic earthquakes emanate from a 1-D stationary stochastic process of zero mean and an analytical form of power spectral density function. The response of the dam section is formed upon a dynamic finite element approach which provides the temporal variations of the stresses, strains and pore water pressure throughout the model. The constitutive response of the granular soil skeleton and its coupling with the fluid phase is formulated based on the Biot dynamic equations of motion with nonlinear terms compensated for into soil hysteretic damping. Lastly, a stochastic approach to liquefaction based on the transferring of the input motion statistics to the cross section is presented.

Simos, N.; Costantino, C.J.; Reich, M.

1994-08-01T23:59:59.000Z

189

City of Coulee Dam, Washington (Utility Company) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDITOhio (Utility Company) Jump to:Chicopee,Colman Place:Cornell,Coulee Dam,

190

Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004  

SciTech Connect (OSTI)

The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

2005-12-22T23:59:59.000Z

191

Lower Granite Dam Smolt Monitoring Program, 2000 Annual Report.  

SciTech Connect (OSTI)

The 2000 fish collection season at Lower Granite was characterized by lower than average spring flows and spill, low levels of debris, cool water temperatures, increased unclipped yearling and subyearling chinook smolts, and 8,300,546 smolts collected and transported compared to 5,882,872 in 1999. With the continued release of unclipped supplementation chinook and steelhead above Lower Granite Dam, we can no longer accurately distinguish wild chinook, steelhead, and sockeye/kokanee in the sample. Although some table titles in this report still show ''wild'' column headings, the numbers in these columns for 1999 and 2000 include wild and unclipped hatchery origin smolts. The increases over previous years reflect the increased supplementation. A total of 8,300,546 juvenile salmonids were collected at Lower Granite Dam. Of these, 187,862 fish were bypassed back to the river and 7,950,648 were transported to release sites below Bonneville Dam, 7,778,853 by barge and 171,795 by truck. A total of 151,344 salmonids were examined in daily samples. Nine research projects conducted by four agencies impacted a total of 1,361,006 smolts (16.4% of the total collection).

Morrill, Charles; Ross, Doug; Mensik, Fred

2000-01-01T23:59:59.000Z

192

Of Enterprise Principles & Corporate Groups: Does Corporate Law Reach Human Rights?  

E-Print Network [OSTI]

conduct by remote affiliates and business partners of vast multinational corporate organizations. Corporate law, in contrast, governs the "internal affairs" of discrete legal entities within a given jurisdiction, each protected by a limited liability...

Harper Ho, Virginia E.

2013-03-01T23:59:59.000Z

193

Corporations LEHIGH UNIVERSITY 1 Aesculap, Inc.  

E-Print Network [OSTI]

Corporations LEHIGH UNIVERSITY 1 Aesculap, Inc. Air Products Air Products Foundation Arcelor Smarter Fuel, Inc. Sodexo Stryker Orthopaedics Stupp Bros., Inc. Sugarbush Products, Inc. TD Bank Thomson

Napier, Terrence

194

Comments of North American Electric Reliability Corporation ...  

Broader source: Energy.gov (indexed) [DOE]

North American Electric Reliability Corporation (NERC) to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Comments of North American Electric Reliability...

195

Resources, real options, and corporate strategy  

E-Print Network [OSTI]

211–234 Resources, real options, and corporate strategy $D83; G30; G31 Keywords: Real options; Valuation; Corporateparticipants at the Real Options Conference at Northwestern

Bernardo, Antonio; Chowdhry, Bhagwan

1998-01-01T23:59:59.000Z

196

Hindawi Publishing Corporation Advances in Bioinformatics  

E-Print Network [OSTI]

Hindawi Publishing Corporation Advances in Bioinformatics Volume 2012, Article ID 582765, 12 pages- esis generation--all of these tasks require processing and summarizing large amounts of individual

Gent, Universiteit

197

Duro Corporation: Proposed Penalty (2014-CE-23009)  

Broader source: Energy.gov [DOE]

DOE alleged in a Notice of Proposed Civil Penalty that Duro Corporation failed to certify cooking products as compliant with the applicable energy conservation standards.

198

Gibson Electric Membership Corporation- Energy Efficiency Rebates  

Broader source: Energy.gov [DOE]

Gibson Electric Membership Corporation, in collaboration with the Tennessee Valley Authority, promotes energy efficient building design through its [http://www.energyright.com/ ''energy right'']...

199

North American Electric Reliability Corporation (NERC): Reliability...  

Broader source: Energy.gov (indexed) [DOE]

and winter and summer forecasts; monitors the bulk power systems; and educates, trains, and certifies industry personnel. North American Electric Reliability Corporation...

200

Corporate Plan Page 1Forestry Commission England Corporate Plan 2011-15  

E-Print Network [OSTI]

Corporate Plan 2011-15 Page 1Forestry Commission England Corporate Plan 2011-15 Welcome This is the Corporate Plan for the Forestry Commission in England. It is one of a suite of plans including those for Forestry Commission (GB) and Forest Research. This document has been optimised for on-screen reading

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Information GRID in the Corporate World Information GRID in the Corporate World  

E-Print Network [OSTI]

Information GRID in the Corporate World Information GRID in the Corporate World .Bogonikolos Zeus Ontology Grid) project, an EU project funded under the Information Society Technologies programme and EAI Tools is discussed. The COG (Corporate Ontology Grid) project addresses the problem of accessing

Paris-Sud XI, Université de

202

Earl Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It is classified asThis article is a stub. You can helpEarl Corporation

203

Vairex Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 South Place: Salt Lake City, Utah Zip:Scale Solar IncVairex Corporation Jump

204

Sipex Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant ofRichardtonManagement, 2009) | Open EnergySCRSipex Corporation

205

Hygrogenics Corporation | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy Health andof EnergyHydrogen-Powered BusesHygrogenics Corporation

206

EXAR Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision has beenFfe2fb55-352f-473b-a2dd-50ae8b27f0a6 No revision hasESE Alcohol Jump to:EXAR Corporation Jump to:

207

Amphenol Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300Algoil JumpAltergy SystemsAmericanAmphenol Corporation Jump to: navigation,

208

Tyntek Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,LtdInformationTulsa,TuscarawasFallon | OpenTyntek Corporation Jump

209

Emcore Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It is classifiedProject) | OpenTexas:CountyElyria, Ohio:Emcore Corporation

210

Etrion Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It isInformationexplains a4 ClimateEtrion Corporation Jump to:

211

ISE Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat Jump to:PhotonHolyName HousingIIIDrive LtdINDEX JumpISE Corporation Jump

212

IXYS Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat Jump to:PhotonHolyName HousingIIIDrive LtdINDEX JumpISEIXYS Corporation

213

Kanematsu Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpInc Place: EdenOverviewKanematsu Corporation Jump to: navigation,

214

Estimating the seismic stability of the arch dam in the Chirkeiskaya hydrosystem  

SciTech Connect (OSTI)

A calculation analysis of the arch dam constructed in an area with standardized seismicity of magnitude 9-10 is presented.

Khrapkov, A. A.; Skomorovskaya, E. Ya

2004-11-15T23:59:59.000Z

215

Environmental Constraints on Hydropower: An Ex Post Benefit-Cost Analysis of Dam  

E-Print Network [OSTI]

Environmental Constraints on Hydropower: An Ex Post Benefit-Cost Analysis of Dam Relicensing Consumers Protection Act (1986), which instructs federal regulators to ``balance'' hydropower

Kotchen, Matthew J.

216

Law, Politics and Markets of Corporate Governance: Institutional Investors' Influence  

E-Print Network [OSTI]

S. , “The State of Corporate Governance Research,” 23 R.What Matters in Corporate Governance? ,” 22 R. Fin. StudiesLegitimacy and Corporate Governance,” 32 Del. J. Corp. L.

Carniglia, Stephen Davis

2013-01-01T23:59:59.000Z

217

Measuring Efficiency in Corporate Law: The Role of Shareholder Primacy  

E-Print Network [OSTI]

17 Empirical studies of corporate governance reforms such asDirectors as a Corporate Governance Mechanism: Theories andMeans and Ends of Corporate Governance, 97 N W .U. L. R EV .

Fisch, Jill

2004-01-01T23:59:59.000Z

218

Preliminary Notice of Violation, Safety and Ecology Corporation...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Safety and Ecology Corporation - EA-2005-03 Preliminary Notice of Violation, Safety and Ecology Corporation - EA-2005-03 June 14, 2005 Issued to Safety and Ecology Corporation...

219

NEC Corporation Volkswagen Group of America  

E-Print Network [OSTI]

Dentsu-Aegis Network Ltd. Digital Garage Hisense Co. Ltd. Jaguar Land Rover LG Electronics, Inc Alexander W. Dreyfoos, Jr. Informatix, Inc. The LEGO Group Dorothy Lemelson LG Electronics, Inc. Master. Panasonic Corporation RECRUIT Samsung Electronics Co., Ltd. SingTel TCL Multimedia Toshiba Corporation

220

Corporate Political Donations: Investment or Agency?  

E-Print Network [OSTI]

are negatively correlated with returns. A $10,000 increase in donations is associated with a reduction in annual excess returns of 7.4 basis points. Worse corporate governance is associated with larger donations. Even after controlling for corporate governance...

Aggarwal, Rajesh K.; Meschke, Felix; Wang, Tracy Yue

2012-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Is Sustainability Attractive for Corporate Real Estate  

E-Print Network [OSTI]

Is Sustainability Attractive for Corporate Real Estate Decisions ? Research Center ESSEC Working Is Sustainability Attractive for Corporate Real Estate Decisions? Ingrid Nappi-Choulet Professor ESSEC BUSINESS SCHOOL Real Estate and Sustainable Development Chair nappi@essec.fr Aurélien Décamps Researcher ESSEC

Paris-Sud XI, Université de

222

QUESTIONING THE RELEVANCE OF CORPORATE SOCIAL PERFORMANCE  

E-Print Network [OSTI]

on the limits of the concept of Corporate Social Performance (CSP) and its instrumentation in the form on Corporate Social Performance (CSP) and its instrumentation in the form of models for measuring form, the BSC reduces its search for balance to three essential Stakeholders: employees, customers

Paris-Sud XI, Université de

223

Corporate Training On-Site Online Global  

E-Print Network [OSTI]

MAKE THE RIGHT MOVE Corporate Training On-Site · Online · Global IMPROVE YOUR COMPETITIVE ADVANTAGE WITH WORLD-CLASS ON-SITE AND ONLINE SOLUTIONS TAILORED TO MEET YOUR BUSINESS AND EMPLOYEE TRAINING NEEDS a competitive advantage depends on how well your staff executes. UCIrvineExtension's Corporate Training helps

Barrett, Jeffrey A.

224

Climate, geography, and tree establishment in Subalpine Meadows of the Olympic Mountains, Washington, U.S.A.  

SciTech Connect (OSTI)

Noticeable changes in vegetation distribution have occurred in the Pacific Northwest during the last century as trees have established in some subalpine meadows. To study the relationship of this process to climate, recently established trees were aged in six subalpine meadows in the Olympic Mountains, Washington. The sites represent three points along a steep precipitation gradient. Subalpine fir (Abies lasiocarpa) has been establishing at the dry end of the gradient, mountain hemlock (Tsuga mertensiana) at the wet end, and both species in the center. Establishment patterns were compared with deviations from the century-long average for these weather variables: winter precipitation, Palmer Drought Severity Index, and winter, October and May temperatures. Results show that establishment occurred in dry areas when weather conditions were wetter than average, and in wet areas under drier than average conditions. Establishment at central sites did not show consistent relationships with climate. If future climatic conditions continue to warm, establishment of subalpine fir in subalpine meadows in dry areas may cease and mountain hemlock may resume in wet areas. 34 refs., 5 figs., 3 tabs.

Woodward, A.; Silsbee, D.G. [Univ. of Washington, Seattle, WA (United States); Schreiner, E.G. [National Biological Service, Port Angeles, WA (United States)

1995-08-01T23:59:59.000Z

225

Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2005  

SciTech Connect (OSTI)

The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2005. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of two studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 16 and July 15, 2005, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, and (2) smolt approach and fate at B1 Sluiceway Outlet 3C from the B1 forebay. Some of the large appendices are only presented on the compact disk (CD) that accompanies the final report. Examples include six large comma-separated-variable (.CSV) files of hourly fish passage, hourly variances, and Project operations for spring and summer from Appendix E, and large Audio Video Interleave (AVI) files with DIDSON-movie clips of the area upstream of B1 Sluiceway Outlet 3C (Appendix H). Those video clips show smolts approaching the outlet, predators feeding on smolts, and vortices that sometimes entrained approaching smolts into turbines. The CD also includes Adobe Acrobat Portable Document Files (PDF) of the entire report and appendices.

Ploskey, Gene R.; Weiland, Mark A.; Zimmerman, Shon A.; Hughes, James S.; Bouchard, Kyle E.; Fischer, Eric S.; Schilt, Carl R.; Hanks, Michael E.; Kim, Jina; Skalski, John R.; Hedgepeth, J.; Nagy, William T.

2006-12-04T23:59:59.000Z

226

EIS-0352: U.S. 93 Hoover Dam Bypass Project,  

Broader source: Energy.gov [DOE]

The Western Area Power Administration (WAPA) served as a cooperating agency for this Federal Highway Administration Environmental Impact Statement (EIS) due to WAPA’s role in the relocation of several transmission lines. The Federal Highway Administration (FHWA) prepared an Environmental Impact Statement (EIS) for construction of a new segment of U.S. Highway 93 for the purpose of improving congestion and hazardous vehicle/pedestrian conflicts where the highway crosses the Colorado River over Hoover Dam. As a cooperating agency for the EIS, Western Area Power Administration (Western) proposed modifications to its transmission system and facilities to accommodate the construction of the new highway and bridge spanning the Colorado River.

227

Women @ Energy: Kerstin Kleese van Dam | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from theDepartment of Dept.| WEATHERIZATION5Iski WomenKerstin Kleese van Dam Women @

228

Four Dam Pool Power Agency FDPPA | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision has beenFfe2fb55-352f-473b-a2dd-50ae8b27f0a6Theoretical vsFlintFluxInputDam Pool Power Agency FDPPA Jump

229

IT Capital Planning Corporate Management Improvement Program (CMIP)  

Broader source: Energy.gov [DOE]

The Corporate Management Improvement Program (CMIP) was initiated by the Department in recognition of the fact that corporate legacy systems that support administrative functions were nearing the...

230

Trony Solar Corporation formerly Shenzhen Trony Science Technology...  

Open Energy Info (EERE)

Trony Solar Corporation formerly Shenzhen Trony Science Technology Development Co Ltd Jump to: navigation, search Name: Trony Solar Corporation (formerly Shenzhen Trony Science &...

231

Sandia National Laboratories: ECIS-Automotive Fuel Cell Corporation...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ClimateECAbout ECFacilitiesCRFECIS-Automotive Fuel Cell Corporation: Hydrocarbon Membrane Fuels the Success of Future Generation Vehicles ECIS-Automotive Fuel Cell Corporation:...

232

Comments of New England Electric Transmission Corporation on...  

Broader source: Energy.gov (indexed) [DOE]

out of time and comments of New England Electric Transmission Corporation, New England Hydro-Transmission Electric Company, Inc. and New England Hydro-Transmission Corporation and...

233

Shenyang Huachuang Wind Energy Corporation HCWE aka China Creative...  

Open Energy Info (EERE)

Shenyang Huachuang Wind Energy Corporation HCWE aka China Creative Wind Energy Co Ltd Jump to: navigation, search Name: Shenyang Huachuang Wind Energy Corporation (HCWE) (aka China...

234

E-Print Network 3.0 - applications international corporation...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 Matching Gift Companies LEHIGH UNIVERSITY 1 3M Corporation Summary: -Plough Foundation Science Applications International Corporation (SAIC) Scripps Howard Foundation...

235

Testimonials - Partnerships in R&D - Capstone Turbine Corporation...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

R&D - Capstone Turbine Corporation Testimonials - Partnerships in R&D - Capstone Turbine Corporation Addthis Text Version The words Office of Energy Efficiency and Renewable Energy...

236

Integration of the EM Corporate QA Performance Metrics With Performanc...  

Office of Environmental Management (EM)

Integration of the EM Corporate QA Performance Metrics With Performance Analysis Process Integration of the EM Corporate QA Performance Metrics With Performance Analysis Process...

237

Corporate Human Resources Information Services (CHIRS) PIA, Office...  

Broader source: Energy.gov (indexed) [DOE]

Corporate Human Resources Information Services (CHIRS) PIA, Office of Human Capitol Management Corporate Human Resources Information Services (CHIRS) PIA, Office of Human Capitol...

238

Temperature measurement in the Intel Efraim Rotem Mobile Platform Group, Intel corporation  

E-Print Network [OSTI]

, Intel corporation Jim Hermerding ­ Mobile platform Group, Intel corporation Cohen Aviad - Microprocessor

Paris-Sud XI, Université de

239

Effective mitigation of debris flows at Lemon Dam, La Plata County, Colorado  

E-Print Network [OSTI]

Effective mitigation of debris flows at Lemon Dam, La Plata County, Colorado Victor G. deWolfe a May 2007 Abstract To reduce the hazards from debris flows in drainage basins burned by wildfire, erosion control measures such as construction of check dams, installation of log erosion barriers (LEBs

240

Research Report Long lasting effects of rearing by an ethanol-consuming dam  

E-Print Network [OSTI]

Research Report Long lasting effects of rearing by an ethanol-consuming dam on voluntary ethanol rats as subjects, we examined effects of exposure during weaning to a dam consuming ethanol on adolescents' later affinity for ethanol. In a preliminary experiment, we offered rat pups a choice between 8

Galef Jr., Bennett G.

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Continuous Monitoring of an Ice Sheet in a Reservoir Upstream of Beaumont Dam, Canada  

E-Print Network [OSTI]

conducted at the Beaumont hydroelectric dam owned and operated by Hydro-Québec. This power plant has six find- ings will help to harmonize the different standards that are used to manage hydroelectric power considerable economic savings related to minimizing production losses, optimizing dam reinforcement works

Santerre, Rock

242

A. Reservoir Effects of Stream Channels DAM IMPACTS ON AND RESTORATION OF AN ALLUVIAL RIVER  

E-Print Network [OSTI]

A. Reservoir Effects of Stream Channels DAM IMPACTS ON AND RESTORATION OF AN ALLUVIAL RIVER ­ RIO, and restoration efforts. Cochiti Dam was constructed on the main stem of the Rio Grande in 1973 for flood control minnow. Recent restoration strategies include removal of non-native riparian vegetation, mechanical

Julien, Pierre Y.

243

PREDICTION OF TOTAL DISSOLVED GAS EXCHANGE AT HYDROPOWER DAMS  

SciTech Connect (OSTI)

Total dissolved gas (TDG) supersaturation in waters released at hydropower dams can cause gas bubble trauma in fisheries resulting in physical injuries and eyeball protrusion that can lead to mortality. Elevated TDG pressures in hydropower releases are generally caused by the entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin. The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. These dam operations are constrained by state and federal water quality standards for TDG saturation which balance the benefits of spillway operations designed for Endangered Species Act (ESA)-listed fisheries versus the degradation to water quality as defined by TDG saturation. In the 1970s, the United States Environmental Protection Agency (USEPA), under the federal Clean Water Act (Section 303(d)), established a criterion not to exceed the TDG saturation level of 110% in order to protect freshwater and marine aquatic life. The states of Washington and Oregon have adopted special water quality standards for TDG saturation in the tailrace and forebays of hydropower facilities on the Columbia and Snake Rivers where spillway operations support fish passage objectives. The physical processes that affect TDG exchange at hydropower facilities have been studied throughout the CRB in site-specific studies and routine water quality monitoring programs. These data have been used to quantify the relationship between project operations, structural properties, and TDG exchange. These data have also been used to develop predictive models of TDG exchange to support real-time TDG management decisions. These empirically based predictive models have been developed for specific projects and account for both the fate of spillway and powerhouse flows in the tailrace channel and resultant exchange in route to the next downstream dam. Currently, there exists a need to summarize the general finding from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow the formulation of optimal daily water regulation schedules subject to water quality constraints for TDG supersaturation. A generalized TDG exchange model can also be applied to other hydropower dams that affect TDG pressures in tailraces and can be used to develop alternative operational and structural measures to minimize TDG generation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases. TDG data from hydropower facilities located throughout the northwest region of the United States will be used to identify relationships between TDG exchange and relevant dependent variables. Data analysis and regression techniques will be used to develop predictive TDG exchange expressions for various structural categories.

Hadjerioua, Boualem [ORNL; Pasha, MD Fayzul K [ORNL; Stewart, Kevin M [ORNL; Bender, Merlynn [Bureau of Reclamation; Schneider, Michael L. [U.S. Army Corps of Engineers

2012-07-01T23:59:59.000Z

244

Dam and Hydroelectric Powerplant University of Hawai`i CEE 491University of Hawai`i CEE 491  

E-Print Network [OSTI]

Karun 3 Dam and Hydroelectric Powerplant University of Hawai`i ­ CEE 491University of Hawai`i ­ CEE;Location #12;Description/Background Hydroelectric dam on Karun River Help with national energy needs

Prevedouros, Panos D.

245

and 19% of the stomachs of late-lifted fish were Food of the striped bass at Holyoke Dam was  

E-Print Network [OSTI]

below hydroelectric dams and feed on the parts of fish (anadromous or freshwater species) that die Kaplan turbine at a low-head hydroelectric dam. North Am. J. Fish. Manage. 5:33-38. HOLLIS, E. H. 1952

246

A Multiple Network Approach to Corporate Governance  

E-Print Network [OSTI]

In this work, we consider Corporate Governance ties among companies from a multiple network perspective. Such a structurenaturally arises from the close interrelation between the Shareholding Network and the Board of Directors network. Inorder to capture the simultaneous effects on both networks on Corporate Governance, we propose to model the Corporate Governance multiple network structure via tensor analysis. In particular, we consider the TOPHITS model, based on the PARAFAC tensor decomposition, to show that tensor techniques can be successfully applied in this context. After providing some empirical results from the Italian financial market in the univariate case, we will show that a tensor-based multiple network approach can reveal important information.

Bonacina, Fausto; Moretto, Enrico; Stefani, Silvana; Torriero, Anna

2014-01-01T23:59:59.000Z

247

Invited Contribution to Q 76: The Use of Risk Analysis to Support Dam Safety Decisions and Management  

E-Print Network [OSTI]

Decisions and Management DRAFT FOR REVIEW ONLY Portfolio Risk Assessment: A Tool for Managing Dam SafetyICOLD 20th Congress Invited Contribution to Q 76: The Use of Risk Analysis to Support Dam Safety in the Context of the Owner's Business David S. Bowles Professor and Director, Institute for Dam Safety Risk

Bowles, David S.

248

Simulations of The Dalles Dam Proposed Full Length Spillwall  

SciTech Connect (OSTI)

This report presents results of a computational fluid dynamics (CFD) modeling study to evaluatethe impacts of a full-length spillwall at The Dalles Dam. The full-length spillwall is being designed and evaluated as a structural means to improve tailrace egress and thus survival of juvenile fish passing through the spillway. During the course of this study, a full-length spillwall at Bays 6/7 and 8/9 were considered. The U.S. Army Corps of Engineers (USACE) has proposed extending the spillwall constructed in the stilling basin between spillway Bays 6 and 7 about 590 ft farther downstream. It is believed that the extension of the spillwall will improve egress conditions for downstream juvenile salmonids by moving them more rapidly into the thalweg of the river hence reducing their exposure to predators. A numerical model was created, validated, and applied the The Dalles Dam tailrace. The models were designed to assess impacts to flow, tailrace egress, navigation, and adult salmon passage of a proposed spill wall extension. The more extensive model validation undertaken in this study greatly improved our confidence in the numerical model to represent the flow conditions in The Dalles tailrace. This study used these validated CFD models to simulate the potential impacts of a spillwall extension for The Dalles Dam tailrace for two locations. We determined the following: (1)The construction of an extended wall (between Bays 6/7) will not adversely impact entering or exiting the navigation lock. Impact should be less if a wall were constructed between Bays 8/9. (2)The construction of a wall between Bays 6/7 will increase the water surface elevation between the wall and the Washington shore. Although the increased water surface elevation would be beneficial to adult upstream migrants in that it decreases velocities on the approach to the adult ladder, the increased flow depth would enhance dissolved gas production, impacting potential operations of the project because of water quality. A wall between Bays 8/9 should have a lesser impact as the confined spill would be across more bays and the relative flow constriction less. (3) The 405 kcfs case was used for the rapid assessment of flow conditions and hydraulic mechanisms that might be responsible for the unexpected erosion at the end of the shelf downstream of Bay 7.

Rakowski, Cynthia L.; Perkins, William A.; Richmond, Marshall C.; Serkowski, John A.

2008-02-25T23:59:59.000Z

249

ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project  

SciTech Connect (OSTI)

Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor to continue with the project, the Watts Bar Dam Project was canceled and the Exploranium radiation monitors were removed from the doors of Watts Bar Dam in early 2006. The DHS Domestic Nuclear Detection Office decided to proceed with a Pilot building on the ORNL work performed at the TN and SC weigh stations in the highway sector of the Trusted Corridors project and eventually expanded it to other southern states under the name of Southeastern Corridor Pilot Project (SETCP). Many of the Phase I goals were achieved however real-world test data of private watercraft and barges was never obtained.

Walker, Randy M [ORNL; Gross, Ian G [ORNL; Smith, Cyrus M [ORNL; Hill, David E [ORNL

2011-11-01T23:59:59.000Z

250

Solar Energy Systems Tax Credit (Corporate) (Iowa)  

Broader source: Energy.gov [DOE]

Iowa offers a 15% corporate tax credit for solar energy systems. The credit is based on the federal tax credits for solar; a taxpayer may claim 50% of the value of the [http://dsireusa.org...

251

CORPORATE GOVERNANCE AND MANAGEMENT EARNINGS FORECAST  

E-Print Network [OSTI]

1 CORPORATE GOVERNANCE AND MANAGEMENT EARNINGS FORECAST QUALITY: EVIDENCE FROM FRENCH IPOS Anis attributes, ownership retained, auditor quality, and underwriter reputation and management earnings forecast quality measured by management earnings forecast accuracy and bias. Using 117 French IPOs, we find

Paris-Sud XI, Université de

252

Managing preventative maintenance activities at Intel Corporation  

E-Print Network [OSTI]

The work for this thesis was completed at Intel Corporation in Colorado Springs, Colorado at Fab 23, a semiconductor fabrication facility making flash memory. The project focused on evaluating and managing preventative ...

Fearing, Rebecca Cassler

2006-01-01T23:59:59.000Z

253

Selecting Financing Strategies to Overcome Corporate Barriers  

E-Print Network [OSTI]

, or longer than the list of presentations at this year's Industrial Energy Conservation Conference. This paper will focus on two of the many potential answers. First, the corporate decision making process in industrial firms presents many obstacles to a final...

Michaelson, M. L.

1984-01-01T23:59:59.000Z

254

Corporate Analysis of DOE Safety Performance  

Broader source: Energy.gov [DOE]

The Office of Environment, Health, Safety and Security (EHSS), Office of Analysis develops analysis tools and performance dashboards, and conducts analysis of DOE safety performance corporately and on a variety of specific environment, safety and health topics.

255

Renewable Energy Production Tax Credit (Corporate)  

Broader source: Energy.gov [DOE]

Enacted in 2002, the New Mexico Renewable Energy Production Tax Credit provides a tax credit against the corporate income tax of one cent per kilowatt-hour for companies that generate electricity...

256

Bio-Heating Oil Tax Credit (Corporate)  

Broader source: Energy.gov [DOE]

Maryland allows individuals and corporations to take an income tax credit of $0.03/gallon for purchases of biodiesel used for space heating or water heating. The maximum credit is $500 per year. It...

257

3M's Corporate Approach to Energy Management  

E-Print Network [OSTI]

recognized as a corporate environmental management leader and continues to demonstrate such leadership via the company's participation in EPA's Climate Wise and its own internal programs such as Pollution Prevention Pays (3P). Pamela R. Bingham...

Schultz, S. C.; Bingham, P. R.

258

Law as Economy: Convention, Corporation, Currency  

E-Print Network [OSTI]

1015 Law as Economy: Convention, Corporation, Currency Ritu Birla* I. Law as Economy: Nomos. Law Inside/Outside Economy of an orthodox faith in economy as universal law, that is, in the free market as the law of the universe

Barrett, Jeffrey A.

259

CORPORATE AND STRATEGIC PLANNING Faculty planning workbook  

E-Print Network [OSTI]

.............................................................................33 Staffing & workforce planningCORPORATE AND STRATEGIC PLANNING Faculty planning workbook Humanities, Law & Social Studies Outcomes from 2008/09 Confirmation of progress during 2009/10 Faculty planning for 2010/11 ­ 2012/13 #12

260

Alternative Energy Development Incentive (Corporate) (Utah)  

Broader source: Energy.gov [DOE]

The Alternative Energy Development Incentive (AEDI) is a post-performance non-refundable tax credit for 75% of new state tax revenues (including, state, corporate, sales and withholding taxes) over...

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Rock Island Dam Smolt Monitoring; 1996 Annual Report.  

SciTech Connect (OSTI)

Downstream migrating salmon and steelhead (Oncoryhnchus spp.) smolts were monitored at the Rock Island Dam bypass trap from April 1--August 31, 1996. This was the twelfth consecutive year that the bypass trap was monitored. Data collected included: (1) number of fish collected by species, (2) number of fin clipped and/or Passive Integrated Transponder (PIT) tagged fish caught by species, (3) total number of fish showing signs of gas bubble trauma (GBT), (4) percent of descaled fish, and (5) daily average river flow, powerhouse {number_sign}1 flow, powerhouse {number_sign}2 flow and daily average spill. These data were transmitted to the Fish Passage Center (FPC), which manages the Smolt Monitoring Program throughout the Columbia River Basin. The Smolt Monitoring Program is used to manage the water budget, releasing upstream reservoir water storage allocated to supplement river flows during the downstream migration of juvenile salmonids.

McDonald, Robert (Chelan County Public Utility District No. 1, Power Operations Department, Wenatchee, WA)

1996-10-01T23:59:59.000Z

262

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010  

SciTech Connect (OSTI)

The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

2011-02-01T23:59:59.000Z

263

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010  

SciTech Connect (OSTI)

The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

2012-09-01T23:59:59.000Z

264

Investor Sentiment and Antitrust Law as Determinants of Corporate Ownership Structure: The great Merger Wave of 1897 to 1903  

E-Print Network [OSTI]

for Corporate Control: Corporate Governance and EconomicCurrent Trends in Corporate Governance: Going From London toon international corporate governance. This paper retrieves

Cheffins, Brian R.

2002-01-01T23:59:59.000Z

265

Investor Sentiment and Antitrust Law as Determinants of Corporate Ownership Structure: The Great Merger Wave of 1897 to 1903  

E-Print Network [OSTI]

for Corporate Control: Corporate Governance and EconomicCurrent Trends in Corporate Governance: Going From London toon international corporate governance. This paper retrieves

Cheffins, Brian

2002-01-01T23:59:59.000Z

266

Monitoring of Subyearling Chinook Salmon Survival and Passage at Bonneville Dam, Summer 2010  

SciTech Connect (OSTI)

The purpose of this study was to estimate dam passage and route specific survival rates for subyearling Chinook salmon smolts to a primary survival-detection array located 81 km downstream of the dam, evaluate a BGS located in the B2 forebay, and evaluate effects of two spill treatments. The 2010 study also provided estimates of forebay residence time, tailrace egress time, spill passage efficiency (SPE), and spill + B2 Corner Collector (B2CC) efficiency, as required in the Columbia Basin Fish Accords. In addition, the study estimated forebay passage survival and survival of fish traveling from the forebay entrance array, through the dam and downstream through 81 km of tailwater.

Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

2012-09-01T23:59:59.000Z

267

Monitoring of Subyearling Chinook Salmon Survival and Passage at Bonneville Dam, Summer 2010  

SciTech Connect (OSTI)

The purpose of this study was to estimate dam passage and route specific survival rates for subyearling Chinook salmon smolts to a primary survival-detection array located 81 km downstream of the dam, evaluate a BGS located in the B2 forebay, and evaluate effects of two spill treatments. The 2010 study also provided estimates of forebay residence time, tailrace egress time, spill passage efficiency (SPE), and spill + B2 Corner Collector (B2CC) efficiency, as required in the Columbia Basin Fish Accords. In addition, the study estimated forebay passage survival and survival of fish traveling from the forebay entrance array, through the dam and downstream through 81 km of tailwater.

Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

2011-02-01T23:59:59.000Z

268

Page 1Forestry Commission England Corporate Plan 2012-13 Corporate Plan  

E-Print Network [OSTI]

Page 1Forestry Commission England Corporate Plan 2012-13 Corporate Plan 2012-13 #12;Page 2Forestry the environment and supporting a strong green economy, and the Forestry Commission is well placed to contribute toward this. The recent report from the Forestry Regulation Task Force highlighted the need to make

269

Australian Efforts to Promote Corporate Social Responsibility: Can Disclosure Alone Suffice?  

E-Print Network [OSTI]

they comply with the ASX Corporate Governance Principles andAUSTRALIAN EFFORTS Corporate Governance Principles, isand Gary O'Donovan, Corporate Governance and Environmental

von Nessen, Paul

2009-01-01T23:59:59.000Z

270

Comparative Corporate Governance: Findings from a Workshop, March 14-15, 2008  

E-Print Network [OSTI]

of Chicago, ‘‘Corporate Governance: History withoutComparative Corporate Governance Findings from a Workshopon Comparative Corporate Governance, March 14-15, 2008

Huberty, Mark; Newsome, Akasemi; Street, Alex; Ziegler, J. Nicholas

2008-01-01T23:59:59.000Z

271

The Maximands of Corporate Governance: A Theory of Values and Cognitive Style  

E-Print Network [OSTI]

roots of American corporate governance. See Mark J. Roe, Aover the maximands of corporate governance. 4 My goal ison the maximands of corporate governance, that identifies

Licht, Amir

2004-01-01T23:59:59.000Z

272

Firm Value and Corporate Governance: How the Former Determines the Latter  

E-Print Network [OSTI]

The Econometrics of Corporate Governance Studies, Cambridge,Firm Value and Corporate Governance: How the FormerAbstract A model of corporate governance must explain (i)

Hermalin, Benjamin E.

2008-01-01T23:59:59.000Z

273

Changes in Japanese Corporate Law and Governance: Revisiting the Convergence Debate  

E-Print Network [OSTI]

of Path Dependence in Corporate Governance and Ownership.Convergence in Corporate Governance and Its Implicatins.2001). Globalizing Corporate Governance: Convergence of Form

Shishido, Zenichi

2004-01-01T23:59:59.000Z

274

Imitate or Differentiate? Evaluating the validity of corporate social responsibility ratings  

E-Print Network [OSTI]

and A. Metrick “Corporate Governance and Equity Prices. ”investors on corporate governance and social http://it focuses directly on corporate governance and is much more

Chatterji, Aaron K; Levine, David I. I.

2008-01-01T23:59:59.000Z

275

Corporate Governance from a Comparative Perspective: Specific Applications of the Duty of Loyalty in Korea  

E-Print Network [OSTI]

transaction. Kon S. Kim, Corporate Governance in Korea, 8 J.ARTICLES CORPORATE GOVERNANCE FROM A COMPARATIVEof Care Standard in Corporate Governance, 75 IOWA L. REV. 1,

Kwon, Jae Yeol

2004-01-01T23:59:59.000Z

276

The Role of Boards of Directors in Corporate Governance: A Conceptual Framework & Survey  

E-Print Network [OSTI]

Era of Heightened Corporate Governance,” New York UniversityThe Emergence of Corporate Governance from Wall St. to MainAnna, ed. , Corporate Governance and Firm Organization,

Adams, Renee; Hermalin, Benjamin E.; Weisbach, Michael S.

2008-01-01T23:59:59.000Z

277

Monitoring and Evaluation of Yearling Fall Chinook Salmon Released from Acclimation Facilities Upstream of Lower Granite Dam; 1998 Annual Report.  

SciTech Connect (OSTI)

The Nez Perce Tribe, in cooperation with the U.S. Fish and Wildlife Service and Washington Department of Fish and Wildlife, conducted monitoring and evaluation studies on Lyons Ferry Hatchery (Snake River stock) yearling fall chinook salmon that were acclimated and released at three Fall Chinook Acclimation Project sites upstream of Lower Granite Dam along with yearlings released on-station from Lyons Ferry Hatchery in 1998. The three fall chinook acclimation facilities are operated by the Nez Perce Tribe and located at Pittsburg Landing and Captain John Rapids on the Snake River and at Big Canyon Creek on the Clearwater River. Yearlings at the Big Canyon facility consisted of two size classes that are referred to in this report as 9.5 fish per pound (fpp) and 30 fpp. The Big Canyon 9.5 fpp were comparable to the yearlings at Pittsburg Landing, Captain John Rapids and Lyons Ferry Hatchery. A total of 9,942 yearlings were PIT tagged and released at Pittsburg Landing. PIT tagged yearlings had a mean fork length of 159.9 mm and mean condition factor of 1.19. Of the 9,942 PIT tagged fish released, a total of 6,836 unique tags were detected at mainstem Snake and Columbia River dams (Lower Granite, Little Goose, Lower Monumental and McNary). A total of 4,926 9.5 fpp and 2,532 30 fpp yearlings were PIT tagged and released at Big Canyon. PIT tagged 9.5 fpp yearlings had a mean fork length of 156.9 mm and mean condition factor of 1.13. PIT tagged 30 fpp yearlings had a mean fork length of 113.1 mm and mean condition factor of 1.18. Of the 4,926 PIT tagged 9.5 fpp yearlings released, a total of 3,042 unique tags were detected at mainstem Snake and Columbia River dams. Of the 2,532 PIT tagged 30 fpp yearlings released, a total of 1,130 unique tags were detected at mainstem Snake and Columbia River dams. A total of 1,253 yearlings were PIT tagged and released at Captain John Rapids. PIT tagged yearlings had a mean fork length of 147.5 mm and mean condition factor of 1.09. Of the 1,253 PIT tagged fish released, a total of 719 unique tags were detected at mainstem Snake and Columbia River dams. A total of 2,420 yearlings were PIT tagged and released at Lyons Ferry Hatchery. PIT tagged yearlings had a mean fork length of 159.0 mm and mean condition factor of 1.10. Of the 2,420 PIT tagged fish released, a total of 979 unique tags were detected at mainstem Snake and Columbia River dams (Lower Monumental and McNary). Median travel times, based on all detections, of PIT tagged fish released from Pittsburg Landing were 10.5 days to Lower Granite Dam, 21.7 days to McNary Dam and 29.8 days to Bonneville Dam. Median migration rates were 16.4 rkm/d to Lower Granite Dam, 18.3 rkm/d to McNary Dam and 18.9 rkm/d to Bonneville Dam. The median arrival dates were April 25 at Lower Granite Dam, May 6 at McNary Dam and May 14 at Bonneville Dam. The 90% passage dates were May 5 at Lower Granite Dam, May 20 at McNary Dam and May 25 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged 9.5 fpp yearlings released from Big Canyon were 13.3 days to Lower Granite Dam, 26.0 days to McNary Dam and 30.8 days to Bonneville Dam. Median migration rates were 13.0 rkm/d to Lower Granite Dam, 15.3 rkm/d to McNary Dam and 18.3 rkm/d to Bonneville Dam. The median arrival dates were April 27 at Lower Granite Dam, May 11 at McNary Dam and May 15 at Bonneville Dam. The 90% passage dates were May 9 at Lower Granite Dam, May 24 at McNary Dam and May 25 at Bonneville Dam. Median travel times, based on all detections, of PIT tagged 30 fpp yearlings released from Big Canyon were 20.8 days to Lower Granite Dam, 37.6 days to McNary Dam and 43.5 days to Bonneville Dam. Median migration rates were 8.3 rkm/d to Lower Granite Dam, 10.6 rkm/d to McNary Dam and 12.9 rkm/d to Bonneville Dam. The median arrival dates were May 5 at Lower Granite Dam, May 23 at McNary Dam and May 28 at Bonneville Dam. The 90% passage dates were May 22 at Lower Granite Dam, May 31 at McNary Dam and June 5 at Bonneville Dam. Median arrival dates, based on all detections, of PIT tagge

Rocklage, Stephen J. (Nez Perce Tribe, Department of Fisheries Resource Management, Lapwai, ID)

2004-01-01T23:59:59.000Z

278

A Prehistoric Lahar-Dammed Lake And Eruption Of Mount Pinatubo...  

Open Energy Info (EERE)

Pinatubo Described In A Philippine Aborigine Legend Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: A Prehistoric Lahar-Dammed Lake And...

279

Monitoring of Juvenile Subyearling Chinook Salmon Survival and Passage at John Day Dam, Summer 2010  

SciTech Connect (OSTI)

The purpose of this study was to evaluate dam passage survival of subyearling Chinook salmon (Oncorhynchus tshawytscha; CH0) at John Day Dam (JDA) during summer 2010. This study was conducted by researchers from the Pacific Northwest National Laboratory (PNNL) in collaboration with the Pacific States Marine Fisheries Commission (PSMFC) and the University of Washington (UW). The study was designed to estimate the effects of 30% and 40% spill treatment levels on single release survival rates of CH0 passing through two reaches: (1) the dam, and 40 km of tailwater, (2) the forebay, dam, and 40 km of tailwater. The study also estimated additional passage performance measures which are stipulated in the Columbia Basin Fish Accords.

Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Skalski, J. R.; Townsend, Richard L.

2012-11-15T23:59:59.000Z

280

Factors affecting calf and dam weights and their effects on breeding programs  

E-Print Network [OSTI]

FACTORS AFFECTING CALF AND DAM WEIGHTS AND THEIR EFFECTS ON BREEDING PROGRAMS A Thesis By LAMRENCE ALLEN MADDOX, JR. Submitted to the Graduate College of the Texas A&M University in partial fulf illment of the requirements for the degree... of MASTER OF SCIENCE May, 1964 Major Subject: Animal Breeding FACTORS AFFECTING CALF AND DAM WEIGHTS AND THEIR EFFECTS ON BREEDING PROGRAMS A Thesis By IAWRENCE ALLEN MADDOX, JR Approved as to style and content by: (Chairman of Commit ee) (Head...

Maddox, Lawrence Allen

1964-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Optimization of Hydroacoustic Equipment Deployments at Lookout Point and Cougar Dams, Willamette Valley Project, 2010  

SciTech Connect (OSTI)

The goal of the study was to optimize performance of the fixed-location hydroacoustic systems at Lookout Point Dam (LOP) and the acoustic imaging system at Cougar Dam (CGR) by determining deployment and data acquisition methods that minimized structural, electrical, and acoustic interference. The general approach was a multi-step process from mount design to final system configuration. The optimization effort resulted in successful deployments of hydroacoustic equipment at LOP and CGR.

Johnson, Gary E.; Khan, Fenton; Ploskey, Gene R.; Hughes, James S.; Fischer, Eric S.

2010-08-18T23:59:59.000Z

282

Non-powered Dams: An untapped source of renewable electricity in the USA  

SciTech Connect (OSTI)

Hydropower has been a source of clean, renewable electricity in the USA for more than 100 years. Today, approximately 2500 US dams provide 78 GW of conventional and 22 GW of pumped-storage hydropower. In contrast, another approximately 80 000 dams in the USA do not include hydraulic turbine equipment and provide non-energy related services, such as flood control, water supply, navigation, and recreation.

Hadjerioua, Boualem [ORNL; Kao, Shih-Chieh [ORNL; Wei, Yaxing [ORNL; Battey, Hoyt [Department of Energy; Smith, Brennan T [ORNL

2012-01-01T23:59:59.000Z

283

EIS-0351: Operation of Flaming Gorge Dam, Colorado River Storage Project, Colorado River, UT  

Broader source: Energy.gov [DOE]

The Secretary of the United States Department of the Interior (Secretary), acting through the Bureau of Reclamation (Reclamation), is considering whether to implement a proposed action under which Flaming Gorge Dam would be operated to achieve the flow and temperature regimes recommended in the September 2000 report Flow and Temperature Recommendations for Endangered Fishes in the Green River Downstream of Flaming Gorge Dam (2000 Flow and Temperature Recommendations), published by the Upper Colorado River Endangered Fish Recovery Program (Recovery Program).

284

EIS-0480: Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam  

Broader source: Energy.gov [DOE]

Two agencies of the Department of the Interior, Bureau of Reclamation and National Park Service, are jointly preparing a Long-Term Experimental and Management Plan for the Glen Canyon Dam and an EIS for adoption of the Plan. The Glen Canyon Dam, on the Colorado River in northern, Arizona, generates hydroelectric power that is marketed by DOE's Western Area Power Administration, a cooperating agency.

285

Compliance Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at The Dalles Dam, Spring 2010  

SciTech Connect (OSTI)

The purpose of this compliance study was to estimate dam passage survival of yearling Chinook salmon and steelhead smolts at The Dalles Dam during spring 2010. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated smolt passage survival from the forebay boat-restricted zone (BRZ) to the tailrace BRZ at The Dalles Dam, as well as the forebay residence time, tailrace egress, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A virtual/paired-release design was used to estimate dam passage survival at The Dalles Dam. The approach included releases of acoustic-tagged smolts above John Day Dam that contributed to the formation of a virtual release at the face of The Dalles Dam. A survival estimate from this release was adjusted by a paired release below The Dalles Dam. A total of 4,298 yearling Chinook salmon and 4,309 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation. The dam passage survival results are summarized as follows: Yearling Chinook Salmon 0.9641 (SE = 0.0096) and Steelhead 0.9535 (SE = 0.0097).

Carlson, Thomas J.; Skalski, John R.

2010-10-01T23:59:59.000Z

286

Hydropower and the environment: A case study at Glen Canyon Dam  

SciTech Connect (OSTI)

The management of hydroelectric resources in the Colorado River requires a balancing of hydrologic, social, natural and cultural resources. The resulting management often has to deal with inherently conflicting objectives, short and long-term goals, time frames and operational flexibility. Glen Canyon Dam, AZ, on the Colorado River, controls the release of water into the Grand Canyon. The dam has been under intense public scrutiny since it was completed in 1963. An Environmental Impact Statement evaluating the future operations and options for Glen Canyon Dam was initiated by the Department of the Interior in 1989 and completed in 1995. An Adaptive Management approach to future operational management has been developed as part of the Glen Canyon Dam Environmental Impact Statement process. Future operations at Glen Canyon Dam will take into consideration the need to balance water movement and hydroelectricity development with natural, recreation, Native American and cultural needs. Future management of rivers requires acknowledgement of the dynamic nature of ecosystems and the need to link scientific information into the decision-making process. Lessons learned and programs developed at Glen Canyon Dam may be applied to other river systems.

Wegner, D.L. [Denver Technical Service Center, Flagstaff, AZ (United States)

1995-12-31T23:59:59.000Z

287

Operation of the Lower Granite Dam Adult Trap, 2008.  

SciTech Connect (OSTI)

During 2008 we operated the adult salmonid trap at Lower Granite Dam from 7 March through 25 November, except during a short summer period when water temperatures were too high to safely handle fish. We collected and handled a total of 20,463 steelhead Oncorhynchus mykiss and radio-tagged 34 of the hatchery steelhead. We took scale samples from 3,724 spring/summer Chinook salmon O. tshawytscha for age and genetic analysis. We collected and handled a total of 8,254 fall Chinook salmon. Of those fish, 2,520 adults and 942 jacks were transported to Lyons Ferry Hatchery on the Snake River in Washington. In addition, 961 adults and 107 jacks were transported to the Nez Perce Tribal Hatchery on the Clearwater River in Idaho. The remaining 3,724 fall Chinook salmon were passed upstream. Scales samples were taken from 780 fall Chinook salmon tagged with passive integrated transponder (PIT) tags and collected by the sort-by-code system.

Harmon, Jerrel R.

2009-01-01T23:59:59.000Z

288

Tax consequences of separating corporate businesses  

E-Print Network [OSTI]

Lips ARY g ~ggpgF ep &Ex' TAX CONSEQUENCES OP SEPARATING CORPORATE BUSINESSES A Thesis Gordon D. Zuber Submitted to the Graduate School of the Agricultural and lNechanical College of Texas in partial fulfillment of the requirements... for the Degree of MASTER OP BUSINESS ADl/iliVISTRAT ION August 1958 Ma)or Subject: Accounting TAX CONSEQUENCES OP SEPARATING CORPORATE BUSINESSES A Thesis Gordon D. Zuber Approved as to style and content by: Chairman of the Committee ead. o the Divas...

Zuber, Gordon Dewey

2012-06-07T23:59:59.000Z

289

Corporations LEHIGH UNIVERSITY 1 The Accenture Foundation, Inc.  

E-Print Network [OSTI]

Corporations LEHIGH UNIVERSITY 1 The Accenture Foundation, Inc. Air Products Air Products Foundation ArcelorMittal Atofina Chemicals Foundation B. Braun Medical, Inc. (BD) Becton, Dickinson Foundation, Inc. IBM Corporation Insaco, Inc. Just Born, Inc. Lutron Electronics Company, Inc. Lutron

Gilchrist, James F.

290

Corporate Energy Management: A Survey of Large Manufacturing Companies  

E-Print Network [OSTI]

Corporate practices regarding energy management vary substantially from one company to another. Some companies pay close attention to energy use throughout the corporation while others pay scant attention. This paper first describes what we call...

Norland, D. L.; Lind, L.

291

Corporate Gray Military Officer Job Fair | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Corporate Gray Military Officer Job Fair Corporate Gray Military Officer Job Fair September 11, 2014 8:00AM to 1:30PM EDT Location: 6715 Commerce Street, Springfield, VA 22150 POC:...

292

Survey of Radionuclide Distributions Resulting from the Church Rock, New Mexico, Uranium Mill Tailings Pond Dam Failure  

SciTech Connect (OSTI)

An intensive site survey and on-site analysis program were conducted to evaluate the distribution of four radionucliGes in the general vicinity of Gallup, New Mexico, subsequent to the accidental breach of a uranium mill tailings pond dam and the release of a large quantity of tailings pond materials. The objective of this work was to determine the distribution and concentration levels of {sup 210}Pb, {sup 226}Ra, {sup 230}Th, and {sup 238}U in the arroyo that is immediately adjacent to the uranium tailings pond (pipeline arroyo) and in the Rio Puerco arroyo into which the pipeline arroyo drains. An intensive survey between the United Nuclear Corporation (UNC) Church Rock Mill site and the New Mexico-Arizona state border was performed. Sampling locations were established at approximately 500-ft intervals along the arroyo. During the weeks of September 24 through October 5, 1979, a series of samples was collected from alternate sampling locations along the arroyo. The purpose of this collection of samples and their subsequent analysis was to provide an immediate evaluation of the extent and the levels of radioactive contamination. The data obtained from this extensive survey were then compared to action levels which had been proposed by the Nuclear Regulatory Commission and were adapted by the New Mexico Environmental Improvement Division (NMEID) for {sup 230}Th and {sup 226}Ra concentrations that would require site cleanup. The Pacific Northwest Laboratory/Nuclear Regulatory Commission mobile laboratory van was on-site at the UNC Church Rock Mill from September 22, 1979, through December 13, 1979, and was manned by one or more PNL personnel for all but four weeks of this time period. Approximately 1200 samples associated with the Rio Puerco survey were analyzed 1n the laboratory. An additional 1200 samples related to the Rio Puerco cleanup operations which the United Nuclear Corporation was conducting were analyzed on-site in the mobile laboratory. The purpose of these analyses was to determine the effectiveness of the cleanup operations that were ongoing and to evaluate what additional cleanup would be required. This on-site analysis of radioactive contamination constituted the principal task of this project, with the identification of those portions of the arroyo exceeding the NMEID proposed cleanup criteria being the major output. Additiond1 tasks included an evaluation of the initial soil sampling scheme (letter from T. Wolff [NMEID] to J. Abiss [UNC]. oated September 25, 1979) and the proposed NMEID verification sampling scheme (letter from T. Buhl [NMEID] to H. Miller [NRC]. dated April 23, 1980).

Weimer, W. C.; Kinnison, R. R.; Reeves, J. H.

1981-12-01T23:59:59.000Z

293

Rutgers Business School Professor Simi Kedia Corporate Finance  

E-Print Network [OSTI]

Rutgers Business School Professor Simi Kedia Corporate Finance Office: WP - 1132 26:390:572 Phone Objectives: The objective of this course is to introduce doctoral students to research in corporate finance of capital, corporation finance and the theory of investment, American Economic Review. ***S. Myers and N

Lin, Xiaodong

294

2011 Corporate Headquarters: An Analysis of Immediate Communities  

E-Print Network [OSTI]

While the Bay Area’s history has shaped today’s culture, there is little written about how corporations affect their immediate communities. This thesis focuses on the largest corporations in the Bay Area to determine if these corporations have any...

Conti, Serena Nicole

2013-04-25T23:59:59.000Z

295

Hindawi Publishing Corporation Comparative and Functional Genomics  

E-Print Network [OSTI]

Hindawi Publishing Corporation Comparative and Functional Genomics Volume 2007, Article ID 47304, 7 pages doi:10.1155/2007/47304 Meeting Report eGenomics: Cataloguing Our Complete Genome Collection III, Michigan State University, East Lansing, MI 48824, USA 3 The Institute for Genomic Research, 9712 Medical

Newcastle upon Tyne, University of

296

Hindawi Publishing Corporation Advances in Civil Engineering  

E-Print Network [OSTI]

Hindawi Publishing Corporation Advances in Civil Engineering Volume 2009, Article ID 353960, 10 and Josep Dolz3 1 Instituto de Ingenier´ia, UNAM, Ciudad Universitaria, Edificio 5, Cub. 403, 04510 M´exico, DF, Mexico 2 Facultad de Ingenier´ia, UNAM, Ciudad Universitaria, 04510 M´exico, DF, Mexico 3

Fernandez, Thomas

297

Senior projectS corporate Sponsored  

E-Print Network [OSTI]

--Professor, Computer Engineering | http://users.soe.ucsc. edu/~larrabee/Site/Professor_Tracy_Larrabee.html Charlie McSenior projectS program corporate Sponsored Partner's Day May 31, 2012 Baskin School of Engineering earning their engineering degree and fulfilling this capstone design sequence. Our students who have

Stuart, Josh

298

Hindawi Publishing Corporation International Journal of Hypertension  

E-Print Network [OSTI]

Hindawi Publishing Corporation International Journal of Hypertension Volume 2012, Article ID 405892 of Hypertension: The Experience of the Cardiovascular Health Program in Chilean Primary Health Care Centers. To assess the blood pressure control and cardiovascular risk factors (CVRFs) in a population of hypertensive

Gleeson, Joseph G.

299

Hindawi Publishing Corporation Journal of Nanotechnology  

E-Print Network [OSTI]

Hindawi Publishing Corporation Journal of Nanotechnology Volume 2010, Article ID 801789, 42 pages a general interest in both fundamental and practical nanotechnology. Over the past 20 years, research's -orbital axis vector (POAV) #12;2 Journal of Nanotechnology (0,0) (1,0) (2,0) (3,0) (4,0) (5,0) (1,1) (2

Wang, Yan Alexander

300

Researcher at Cerner Corporation Cerner Overview  

E-Print Network [OSTI]

Researcher at Cerner Corporation Cerner Overview Cerner is the leading U.S. supplier of healthcare Qualifications Minimum Qualifications: · Master's degree in biostatistics, epidemiology, MIS or related field. Preferred Qualifications: · Intermediate knowledge of both traditional statistical methods and modern

Jornsten, Rebecka

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

A generalized simulation model for corporate planning  

E-Print Network [OSTI]

, Head of the Department of Industrial Engineering, at Texas ASM University, a" quoted by Hilton (24): "It /corporate pianning7 should serve as the roadmap of tomorrow. We see it as an azzalysis of all the activities that influ- ence ozr business...

Viswanathan, Krishnan

2012-06-07T23:59:59.000Z

302

Hindawi Publishing Corporation International Journal of Ecology  

E-Print Network [OSTI]

Hindawi Publishing Corporation International Journal of Ecology Volume 2012, Article ID 939862, 17 pages doi:10.1155/2012/939862 Review Article Parallel Ecological Speciation in Plants? Katherine L speciation, known as parallel ecological speciation, is one of several forms of evidence for ecology's role

Rieseberg, Loren

303

URANIUM MILLING ACTIVITIES AT SEQUOYAH FUELS CORPORATION  

E-Print Network [OSTI]

Sequoyah Fuels Corporation (SFC) describes previous operations at its Gore, Oklahoma, uranium conversion facility as: (1) the recovery of uranium by concentration and purification processes; and (2) the conversion of concentrated and purified uranium ore into uranium hexafluoride (UF 6), or the reduction of depleted uranium tetrafluoride (UF 4) to UF 6. SFC contends that these

unknown authors

304

UNIVERSITY OF KENTUCKY AND AFFILIATED CORPORATIONS  

E-Print Network [OSTI]

UNIVERSITY OF KENTUCKY AND AFFILIATED CORPORATIONS ENDOWMENT INVESTMENT POLICY Amended January 30, 2014 University of Kentucky University of Kentucky Research Foundation The Fund for Advancement of Education and Research in the UK Medical Center University of Kentucky Mining Engineering Foundation, Inc

Hayes, Jane E.

305

Free Flow Power Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision has beenFfe2fb55-352f-473b-a2dd-50ae8b27f0a6Theoretical vsFlintFluxInputDam PoolCounty, Maryland:Power

306

The Dalles Dam, Columbia River: Spillway Improvement CFD Study  

SciTech Connect (OSTI)

This report documents development of computational fluid dynamics (CFD) models that were applied to The Dalles spillway for the US Army Corps of Engineers, Portland District. The models have been successfully validated against physical models and prototype data, and are suitable to support biological research and operations management. The CFD models have been proven to provide reliable information in the turbulent high-velocity flow field downstream of the spillway face that is typically difficult to monitor in the prototype. In addition, CFD data provides hydraulic information throughout the solution domain that can be easily extracted from archived simulations for later use if necessary. This project is part of an ongoing program at the Portland District to improve spillway survival conditions for juvenile salmon at The Dalles. Biological data collected at The Dalles spillway have shown that for the original spillway configuration juvenile salmon passage survival is lower than desired. Therefore, the Portland District is seeking to identify operational and/or structural changes that might be implemented to improve fish passage survival. Pacific Northwest National Laboratory (PNNL) went through a sequence of steps to develop a CFD model of The Dalles spillway and tailrace. The first step was to identify a preferred CFD modeling package. In the case of The Dalles spillway, Flow-3D was as selected because of its ability to simulate the turbulent free-surface flows that occur downstream of each spilling bay. The second step in development of The Dalles CFD model was to assemble bathymetric datasets and structural drawings sufficient to describe the dam (powerhouse, non-overflow dam, spillway, fish ladder entrances, etc.) and tailrace. These datasets are documented in this report as are various 3-D graphical representations of The Dalles spillway and tailrace. The performance of the CFD model was then validated for several cases as the third step. The validated model was then applied to address specific SIS design questions. Specifically, the CFD models were used to evaluate flow deflectors, baffle block removal and the effects of spillwalls. The CFD models were also used to evaluate downstream differences at other locations, such as at the Highway 197 bridge piers and Oregon shore islands, due to alterations in spill pattern. CFD model results were analyzed to quantitatively compare impacts of the spillwall that has subsequently been constructed between bays 6 and 7. CFD model results provided detailed information about how the spillwall would impact downstream flow patterns that complemented results from the 1:80 scale physical model. The CFD model was also used to examine relative differences between the juvenile spill pattern used in previous years and the anticipated spill pattern that will be applied once the wall is complete. In addition, the CFD model examined velocity magnitudes over the downstream basalt shelf to investigate potential for erosion under high flow conditions (e.g., 21 kcfs/bay for bays 1 through 6) with the spillwall in place. Several appendices follow the results and discussion sections of this report. These appendices document the large number of CFD simulations that have been performed by PNNL; both spillway improvement study (SIS) related and those performed for related biological tests.

Cook, Chris B.; Richmond, Marshall C.; Serkowski, John A.

2006-06-01T23:59:59.000Z

307

Olympic Oval Emergency Instructions  

E-Print Network [OSTI]

Security at 403-220-5333 from a safe location Hazardous Materials Spill Only attempt to clean up a spill assailant, run away from the subject Hide - if you cannot flee, or do not know the location of the shooter, hide in a locked or barricaded room and turn out the lights Fight ­ if confronted by the shooter

de Leon, Alex R.

308

Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)—a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

2011-03-01T23:59:59.000Z

309

Computational Fluid Dynamics Modeling of the John Day Dam Tailrace  

SciTech Connect (OSTI)

US Army Corps of Engineers - Portland District required that a two-dimensional (2D) depth-averaged and a three-dimensional (3D) free-surface numerical models to be developed and validated for the John Day tailrace. These models were used to assess potential impact of a select group of structural and operational alternatives to tailrace flows aimed at improving fish survival at John Day Dam. The 2D model was used for the initial assessment of the alternatives in conjunction with a reduced-scale physical model of the John Day Project. A finer resolution 3D model was used to more accurately model the details of flow in the stilling basin and near-project tailrace hydraulics. Three-dimensional model results were used as input to the Pacific Northwest National Laboratory particle tracking software, and particle paths and times to pass a downstream cross section were used to assess the relative differences in travel times resulting from project operations and structural scenarios for multiple total river flows. Streamlines and neutrally-buoyant particles were seeded in all turbine and spill bays with flows. For a Total River of 250 kcfs running with the Fish Passage Plan spill pattern and a spillwall, the mean residence times for all particles were little changed; however the tails of the distribution were truncated for both spillway and powerhouse release points, and, for the powerhouse releases, reduced the residence time for 75% of the particles to pass a downstream cross section from 45.5 minutes to 41.3 minutes. For a total river of 125 kcfs configured with the operations from the Fish Passage Plan for the temporary spillway weirs and for a proposed spillwall, the neutrally-buoyant particle tracking data showed that the river with a spillwall in place had the overall mean residence time increase; however, the residence time for 75% of the powerhouse-released particles to pass a downstream cross section was reduced from 102.4 min to 89 minutes.

Rakowski, Cynthia L.; Perkins, William A.; Richmond, Marshall C.; Serkowski, John A.

2010-07-08T23:59:59.000Z

310

Fish Migration, Dams, and Loss of Ecosystem Services in the Mekong Basin  

SciTech Connect (OSTI)

The past decade has seen increased international recognition of the importance of the services provided by natural ecosystems. It is unclear however whether such international awareness will lead to improved environmental management in many regions. We explore this issue by examining the specific case of fish migration and dams on the Mekong river. We determine that dams on the Mekong mainstem and major tributaries will have a major impact on the basin's fisheries and the people who depend upon them for food and income. We find no evidence that current moves towards dam construction will stop, and consider two scenarios for the future of the fisheries and other ecosystems of the basin. We conclude that major investment is required in innovative technology to reduce the loss of ecosystem services, and alternative livelihood strategies to cope with the losses that do occur

Dugan, Patrick J. [WorldFish Center; Barlow, Chris [Australian Center for International Agricultural Research (ACIAR); Agostinho, Angelo A. [Fundacao University, Parana Brazil; Baran, Eric [WorldFish Center; Cada, Glenn F [ORNL; Chen, Daqing [Yangtze River Fisheries Research Institute, People's Republic of China; Cowx, Ian G. [Hull International Fisheries Research Institute, England; Ferguson, John W. [North West Fisheries Science Center, Seattle, WA; Jutagate, Tuantong [Ubon Ratchathani University, Ubon Ratchathani, Thailand; Mallen-Cooper, Martin [Fishway Consulting Service, Australia; Marmulla, Gerd [Food and Agriculture Organization of the United Nations (FAO), Rome, Italy; Nestler, John [USA Corps Engineers, Concord, MA USA; Petrere, Miquel [Universidade Estadual Paulista, Rio Claro, Brazil; Winemiller, Kirk O. [Texas A& M University

2010-06-01T23:59:59.000Z

311

Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.  

SciTech Connect (OSTI)

In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

1993-03-10T23:59:59.000Z

312

Temporary Restoration of Bull Trout Passage at Albeni Falls Dam, 2008 Progress Report.  

SciTech Connect (OSTI)

The goal of this project is to provide temporary upstream passage of bull trout around Albeni Falls Dam on the Pend Oreille River, Idaho. Our specific objectives are to capture fish downstream of Albeni Falls Dam, tag them with combination acoustic and radio transmitters, release them upstream of Albeni Falls Dam, and determine if genetic information on tagged fish can be used to accurately establish where fish are located during the spawning season. In 2007, radio receiving stations were installed at several locations throughout the Pend Oreille River watershed to detect movements of adult bull trout; however, no bull trout were tagged during that year. In 2008, four bull trout were captured downstream of Albeni Falls Dam, implanted with transmitters, and released upstream of the dam at Priest River, Idaho. The most-likely natal tributaries of bull trout assigned using genetic analyses were Grouse Creek (N = 2); a tributary of the Pack River, Lightning Creek (N = 1); and Rattle Creek (N = 1), a tributary of Lightning Creek. All four bull trout migrated upstream from the release site in Priest River, Idaho, were detected at monitoring stations near Dover, Idaho, and were presumed to reside in Lake Pend Oreille from spring until fall 2008. The transmitter of one bull trout with a genetic assignment to Grouse Creek was found in Grouse Creek in October 2008; however, the fish was not found. The bull trout assigned to Rattle Creek was detected in the Clark Fork River downstream from Cabinet Gorge Dam (approximately 13 km from the mouth of Lightning Creek) in September but was not detected entering Lightning Creek. The remaining two bull trout were not detected in 2008 after detection at the Dover receiving stations. This report details the progress by work element in the 2008 statement of work, including data analyses of fish movements, and expands on the information reported in the quarterly Pisces status reports.

Bellgraph, Brian J. [Pacific Northwest National Laboratory

2009-03-31T23:59:59.000Z

313

People's Electric Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Powerstories onFocusOski Energy LLCPascoag UtilityPennsylvaniaPeopleCorporation

314

Jackson Purchase Energy Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Powerstories on climate compatibleInformation offApproachEnergy Corporation

315

Meridian Biorefining Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Powerstories on climateJunoMedanosElectric CoMeridian Biorefining Corporation

316

NanoPV Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3Informationof Energy Calculator29NanoPV Corporation Jump to:

317

Nanomaterials Discovery Corporation NDC | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte3Informationof Energy Calculator29NanoPV Corporation

318

Cosmos Energy Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentratingRenewable Solutions LLC Jump to:Information NewAdvisorsCosmos Energy Corporation

319

Miami Power Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 -Energieprojekte GmbH Jump to: navigation,MetalysisMi GmbHMiami Power Corporation

320

PPP Equipment Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(UtilityCounty,Orleans County,PPP Equipment Corporation Jump to: navigation,

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Powder River Energy Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoadingPenobscot County, Maine:Plug Power IncPowder River Energy Corporation Place: Sundance,

322

GainSpan Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power Basics (TheEtelligenceGainSpan Corporation Jump to: navigation, search

323

Gateway Energy Services Corporation (Pennsylvania) | Open Energy  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power Basics (TheEtelligenceGainSpan Corporation JumpGarkane Energy

324

Gateway Energy Services Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Power Basics (TheEtelligenceGainSpan Corporation JumpGarkane EnergyGateway

325

Catamount Resources Corporation CRC | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORT Americium/CuriumSunways JVGroup India Jump to:Corporation CRC Jump

326

Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2011  

SciTech Connect (OSTI)

This report presents survival, behavioral, and fish passage results for tagged yearling Chinook salmon and juvenile steelhead as part of a survival study conducted at John Day Dam during spring 2011. This study was designed to evaluate the passage and survival of yearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a paired-release survival model.

Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Hughes, James S.; Hennen, Matthew J.; Kim, Jin A.; Deng, Zhiqun; Fu, Tao; Skalski, J. R.; Townsend, Richard L.; Wagner, Katie A.; Fischer, Eric S.; Duncan, Joanne P.; Batten, G.; Carlson, Thomas J.; Carpenter, Scott M.; Cushing, Aaron W.; Elder, T.; Etherington, D. J.; Johnson, Gary E.; Khan, Fenton; Miracle, Ann L.; Mitchell, T. D.; Prather, K.; Rayamajhi, Bishes; Royer, Ida; Seaburg, Adam; Zimmerman, Shon A.

2013-06-21T23:59:59.000Z

327

Relationship of the weaning weight of beef calves to the size of their dams  

E-Print Network [OSTI]

of MASTER OF SCIENCE August 1964 Major Subject; Animal Breeding REIATIONSHIP OF THE WEANING WEIGHT OF BEEF CALVES TO THE SIZE OF THEIR DAMS A Thesis By JAMES EDWARD TANNER Approved as to style and content by: ';/ . (Chatrman o Committee) (Head... of age of dam within weight groups of Angus cows 20 Analyses of covariance of 200-day weight (lb. ? of Angus calves. Estimated least-squares constants for 200-day weight (lb. ) of Angus calves Least-squares means of 200-day weight (lb. ) of Angus...

Tanner, James Edward

1964-01-01T23:59:59.000Z

328

A biometrical evaluation of relationships between dam weight and progeny preweaning performance in beef cattle  

E-Print Network [OSTI]

A BIDMETRICA' EVALUA11ON Oi. RELATIONSV, IPS BFT'AEENI DAM W. IGHT AND PROGENY nREIfEANING PERFORMANCE IN BEEF CATILE A Thesis by GFRALD MAX SMITH Suf&mitfed to the Cradua'te Colleae of Texas Aiild University in pardial f. . lfillmen...& I TH App oved as Io style and content by: (Head of Doper t nant ) I Pie p1 be I' ) AoGnst ISSB ABS'IRAC) A P&ometricaI Bvaluation o~ Relationships Betweor Dam lrieight and Progeny Preweaning Performance in Beef Cattle. (Augusl I"GB) Gerald...

Smith, Gerald Max

1968-01-01T23:59:59.000Z

329

Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007  

SciTech Connect (OSTI)

The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

2008-12-01T23:59:59.000Z

330

Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam, 2010  

SciTech Connect (OSTI)

This report presents survival, behavioral, and fish passage results for yearling and subyearling Chinook salmon smolts and juvenile steelhead tagged with JSATS acoustic micro-transmitters as part of a survival study conducted at John Day Dam during 2010. This study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead to assist managers in identifying dam operations for compliance testing as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the 2008 Columbia Basin Fish Accords. Survival estimates were based on a single-release survival estimate model.

Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Hughes, James S.; Kim, Jin A.; Deng, Zhiqun; Fu, Tao; Fischer, Eric S.; Skalski, J. R.; Townsend, Richard L.; Duncan, Joanne P.; Hennen, Matthew J.; Wagner, Katie A.; Arntzen, Evan V.; Miller, Benjamin L.; Miracle, Ann L.; Zimmerman, Shon A.; Royer, Ida M.; Khan, Fenton; Cushing, Aaron W.; Etherington, D. J.; Mitchell, T. D.; Elder, T.; Batton, George; Johnson, Gary E.; Carlson, Thomas J.

2013-05-01T23:59:59.000Z

331

Eco-Design of River Fishways for Upstream Passage: Application for Hanfeng Dam, Pengxi River, China  

SciTech Connect (OSTI)

This paper provides a scientific approach to eco-design of river fishways to allow upstream movement of fish past new and existing dams in China. This eco-design approach integrates principles of fish ecology/behavior and engineering, a scientific field also known as bio-engineering or eco-hydraulics. We define a fishway as a structure or mechanism to convey fish upstream past a dam. Man-made or natural stream beds can be part of the fishway mechanism. Fish include bony and non-bony fishes, and upstream passage is the concern here, not downstream passage. The problem is dams block access to upstream habitat used for spawning, rearing, and refuge, i.e., dams decrease habitat connectivity. A solution to alleviate this problem is to design fishways, preferably while the dam is being designed, but if necessary, as retrofits afterward to provide a route that fish can and will use to pass safely upstream without undue delay. Our eco-design approach for fishways involves eight steps: 1) identify the primary species of importance; 2) understand basic ecology and behavior of these fish; 3) characterize the environmental conditions where passage is or will be blocked; 4 identify fishway alternatives and select a preferred alternative; 5) establish eco-design criteria for the fishway, either from management agencies or, if necessary, developed specifically for the given site; 6) where needed, identify and perform research required to resolve critical uncertainties and finalize the eco-design criteria; 7) apply the eco-design criteria and site-specific considerations to design the fishway, involving peer-review by local stakeholders in the process; 8) build the fishway, monitor its effectiveness, and apply the lessons learned. Example fishways are described showing a range of eco-designs depending on the dam site and fish species of concern. We apply the eco-design principles to recommend an approach and next steps for a fishway to pass fish upstream at Hanfeng Dam, an existing regulating dam forming Hanfeng Lake on the Pengxi River near Kaixian, China.

Johnson, Gary E.; Rainey, William S.

2012-05-20T23:59:59.000Z

332

Survival and Passage of Yearling and Subyearling Chinook Salmon and Steelhead at The Dalles Dam, 2010  

SciTech Connect (OSTI)

The acoustic telemetry study reported here was conducted by researchers at Pacific Northwest National Laboratory (PNNL) and the University of Washington (UW) for the U.S. Army Corps of Engineers, Portland District (USACE). The purpose of the study was to estimate dam passage survival and other performance measures for yearling and subyearling Chinook salmon and steelhead at The Dalles Dam as stipulated by the 2008 Biological Opinion on operation of the Federal Columbia River Power System (FCRPS) and 2008 Columbia Basin Fish Accords.

Johnson, Gary E.; Skalski, J. R.; Carlson, Thomas J.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Fischer, Eric S.; Hughes, James S.; Khan, Fenton; Kim, Jin A.; Townsend, Richard L.

2011-12-01T23:59:59.000Z

333

Hungry Horse Dam Fisheries Mitigation; Kokanee Stocking and Monitoring in Flathead Lake, 1995 Annual Report.  

SciTech Connect (OSTI)

The operation of Hungry Horse Dam on the South Fork-of the Flathead River reduced the reproductive success of kokanee (Oncorhynchus nerka) spawning in the Flathead River. Montana Fish, Wildlife and Parks (MFWP) and the Confederated Salish and Kootenai Tribes (CSKT) authored a mitigation plan to offset those losses. The mitigation goal, stated in the Fisheries Mitigation Plan for Losses Attributed to the Construction and Operation of Hungry Horse Dam, is to: {open_quotes}Replace lost annual production of 100,000 kokanee adults, initially through hatchery production and pen rearing in Flathead Lake, partially replacing lost forage for lake trout (Salvelinus namaycush) in Flathead Lake.{close_quotes}

Fredenberg, Wade; Carty, Daniel (US Fish and Wildlife Service, Kalispell, MT); Cavigli, Jon (Montana Department of Fish, Wildlife and Parks, Kalispell, MT)

1996-06-01T23:59:59.000Z

334

Apparatus for efficient sidewall containment of molten metal with horizontal alternating magnetic fields utilizing a ferromagnetic dam  

DOE Patents [OSTI]

An apparatus is disclosed for casting sheets of metal from molten metal. The apparatus includes a containment structure having an open side, a horizontal alternating magnetic field generating structure and a ferromagnetic dam. The magnetic field and the ferromagnetic dam contain the molten metal from leaking out side portions of the open side of the containment structure. 25 figs.

Praeg, W.F.

1997-02-11T23:59:59.000Z

335

Do impassable dams and flow regulation constrain the distribution of green sturgeon in the Sacramento River, California?  

E-Print Network [OSTI]

, American River, and Yuba River. While dams block access to about 9% of historically available habitatDo impassable dams and flow regulation constrain the distribution of green sturgeon in the Sacramento River, California? By E. A. Mora1 , S. T. Lindley2 , D. L. Erickson3 and A. P. Klimley4 1 Joint

Klimley, A. Peter

336

White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2002-2003 Annual Report.  

SciTech Connect (OSTI)

We report on our progress from April 2002 through March 2003 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

Ward, David L.; Kern, J. Chris; Hughes, Michele L. (Oregon Department of Fish and Wildlife)

2004-02-01T23:59:59.000Z

337

White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2001-2002 Annual Report.  

SciTech Connect (OSTI)

We report on our progress from April 2001 through March 2002 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam.

Ward, David L.; Kern, J. Chris; Hughes, Michele L.

2003-12-01T23:59:59.000Z

338

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011  

SciTech Connect (OSTI)

The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

2012-03-01T23:59:59.000Z

339

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, Spring 2011  

SciTech Connect (OSTI)

The study was designed to estimate dam passage survival at John Day Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.

2012-02-01T23:59:59.000Z

340

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011  

SciTech Connect (OSTI)

The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

2012-06-07T23:59:59.000Z

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, Spring 2011  

SciTech Connect (OSTI)

The study was designed to estimate dam passage survival at John Day Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Carlson, Thomas J.

2012-06-01T23:59:59.000Z

342

The Olympus Scandal and Corporate Governance Reform: Can Japan Find a Middle Ground between the Board Monitoring Model and Management Model  

E-Print Network [OSTI]

OLYMPUS SCANDAL AND CORPORATE GOVERNANCE REFORM: CAN JAPANScandal and Corporate Governance Issues A. Background of theunder Japan's Corporate Governance System ..

Aronson, Bruce E.

2012-01-01T23:59:59.000Z

343

Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008  

SciTech Connect (OSTI)

Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

2010-02-12T23:59:59.000Z

344

"Enlightened Shareholder Value": Corporate Governance Beyond the Shareholder - Stakeholder Divide  

E-Print Network [OSTI]

Ho FINAL.docx Do Not Delete 11/15/2010 4:38 PM “Enlightened Shareholder Value”: Corporate Governance Beyond the Shareholder-Stakeholder Divide Virginia Harper Ho* I. INTRODUCTION... on Risk Management and Corporate Governance, Oct. 2009, for their generous comments on earlier drafts. All remaining errors are mine alone. Ho FINAL.docx Do Not Delete 11/15/2010 4:38 PM 60 The Journal of Corporation Law [Vol. 36:1 1. The Enlightened...

Harper Ho, Virginia E.

2010-01-01T23:59:59.000Z

345

The Shareholder Derivative Action and Good Corporate Governance in China: Why the Excitement is Actually for Nothing  

E-Print Network [OSTI]

Noack & Dirk Zetzsche, Corporate Governance Reform in Ger-Protection Seriously? Corporate Governance in the UnitedDonald C. Clarke, Corporate Governance in China: An Overview

Zhang, Zhong

2011-01-01T23:59:59.000Z

346

On the Export of U.S.-Style Corporate Fiduciary Duties to Other Cultures: Can A Transplant Take?  

E-Print Network [OSTI]

able to evolve corporate governance patterns that resemble2002. How To Fix Corporate Governance, Business Week 69-78 (Cultural Theory of Corporate Governance Systems, Delaware

Stout, Lynn A.

2005-01-01T23:59:59.000Z

347

Assessment of Natural Stream Sites for Hydroelectric Dams in the Pacific Northwest Region  

SciTech Connect (OSTI)

This pilot study presents a methodology for modeling project characteristics using a development model of a stream obstructing dam. The model is applied to all individual stream reaches in hydrologic region 17, which encompasses nearly all of Idaho, Oregon, and Washington. Project site characteristics produced by the modeling technique include: capacity potential, principal dam dimensions, number of required auxiliary dams, total extent of the constructed impoundment boundary, and the surface area of the resulting reservoir. Aggregated capacity potential values for the region are presented in capacity categories including total, that at existing dams, within federal and environmentally sensitive exclusion zones, and the balance which is consider available for greenfield development within the limits of the study. Distributions of site characteristics for small hydropower sites are presented and discussed. These sites are screened to identify candidate small hydropower sites and distributions of the site characteristics of this site population are presented and discussed. Recommendations are made for upgrading the methodology and extensions to make the results more accessible and available on a larger scale.

Douglas G. Hall; Kristin L. Verdin; Randy D. Lee

2012-03-01T23:59:59.000Z

348

Updating of Safety Criteria for Basic Diagnostic Indicators of Dam at the Sayano-Shushenskaya HPP  

SciTech Connect (OSTI)

Values of diagnostic indicators [K]-limitations placed on radial displacements and turn angles of horizontal sections of the dam - which are permitted for each upper-pool level within the range from 520 to 539 m are determined and proposed for inclusion in the Declaration of Safety. Empirical relationships used to develop safety criteria K1 and K2 are modified.

Gordon, L. A.; Skvortsova, A. E. [JSC 'VNIIG im. B. E. Vedeneeva' (Russian Federation)] [JSC 'VNIIG im. B. E. Vedeneeva' (Russian Federation)

2013-09-15T23:59:59.000Z

349

DOWNSTREAM EFFECTS OF DIVERSION DAMS ON SEDIMENT AND HYDRAULIC CONDITIONS OF ROCKY MOUNTAIN STREAMS  

E-Print Network [OSTI]

DOWNSTREAM EFFECTS OF DIVERSION DAMS ON SEDIMENT AND HYDRAULIC CONDITIONS OF ROCKY MOUNTAIN STREAMS of downstream channels and lead to accumulation of fine sediments and habitat degradation. To investigate, we-sediment measures, and an intensive sampling scheme, this study found that channels downstream of diversions

Poff, N. LeRoy

350

Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.  

SciTech Connect (OSTI)

The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

Ashley, Paul

1992-06-01T23:59:59.000Z

351

Sluiceway Operations to Pass Juvenile Salmonids at The Dalles Dam, Columbia River, USA  

SciTech Connect (OSTI)

Existing ice and trash sluiceways are commonly used to pass juvenile salmonids downstream at hydropower dams through a benign, non-turbine route. At The Dalles Dam on the Columbia River, managers undertook optimizing operations of sluiceway weirs to maximize survival of juvenile salmonids at the powerhouse. We applied fixed-location hydroacoustic methods to compare fish passage rates and sluiceway efficiencies for two weir configurations during 2004 and 2005: three weirs versus six weirs, located at the mid- versus east powerhouse, respectively. We also analyzed horizontal distributions of passage at the sluiceway and turbines and the effects of operating turbines beneath open sluiceway gates to provide supporting data relevant to operations optimization. Based on the findings, we recommend the following for long-term operations for the sluiceway at The Dalles Dam: open six rather than three sluiceway weirs to take advantage of the maximum hydraulic capacity of the sluiceway; open the three weirs above the western-most operating main turbine unit (MU) and the three weirs at MU 8 where turbine passage rates are relatively high; operate the turbine units below open sluiceway weirs as a standard procedure; operate the sluiceway 24 h/d year-round to maximize its benefits to juvenile salmonids; and use the same operations for spring and summer emigrants. These operational concepts are transferable to dams where sluiceway surface flow outlets are used protect downstream migrating fishes.

Johnson, Gary E.; Khan, Fenton; Skalski, J. R.; Klatte, Bernard A.

2013-11-20T23:59:59.000Z

352

Monitoring of the stresses induced by AAR in the Beauharnois concrete gravity dam  

SciTech Connect (OSTI)

The Beauharnois dam is a well known example of a large dam subjected to AAR attack. This particular dam was built in different stages and its powerhouse contains 3 sections having distinct AAR evolutions over time. It has been decided to monitor the stress variations in the different structural parts of the dam using a new technique; instrumented concrete inclusion (CIUS: Cylindre instruments de l`Universite de Sherbrooke) grouted into concrete mass. With the readings obtained from vibrating wire extensometers, it is possible to monitor the stress variations in two dimensions (2D) and three dimensions (3D) taking into account the surrounding conditions (temperature, relative humidity, etc.). Three cylinders (2D) were installed in 1987 and seven (3D) in 1992. It appears that compressive stresses are induced in powerhouse numbers 1 and 3 and anisotropic conditions produced in powerhouse number 1, with large horizontal stresses due to closing of the expansive joints. It appears also that stresses are building around the injected inclusion very quickly, within a few months, and are close to the maximum tensile strength value of the concrete. These stress changes, when isotropic are comparable to variations of interstitial pressures in saturated soils during a loading processes.

Ballivy, G.; Bois, A.P. [Universite de Sherbrooke, Quebec (Canada); Saleh, K.; Rivest, M. [Hydro-Quebec, Montreal (Canada)

1995-12-31T23:59:59.000Z

353

Juvenile Radio-Tag Study: Lower Granite Dam, 1985 Annual Report.  

SciTech Connect (OSTI)

The concept of using mass releases of juvenile radio tags represents a new and potentially powerful research tool that could be effectively applied to juvenile salmonid passage problems at dams on the Columbia and Snake Rivers. A system of detector antennas, strategically located, would automatically detect and record individually tagged juvenile salmonids as they pass through the spillway, powerhouse, bypass system, or tailrace areas below the dam. Accurate measurements of spill effectiveness, fish guiding efficiency (FGE), collection efficiency (CE), spillway survival, powerhouse survival, and bypass survival would be possible without handling large numbers of unmarked fish. A prototype juvenile radio-tag system was developed and tested by the National Marine Fisheries Service (NMFS) and Bonneville Power Administration (BPA) at John Day Dam and at Lower Granite Dam. This report summarizes research to: (1) evaluate the effectiveness of the prototype juvenile radio-tag system in a field situation and (2) to test the basic assumptions inherent in using the juvenile radio tag as a research tool.

Stuehrenberg, Lowell C.

1986-06-01T23:59:59.000Z

354

Durability Assessment of an Arch Dam using Inverse Analysis with Neural Networks and High Performance Computing.  

E-Print Network [OSTI]

the viscoelastic parameters; 3D FEM analysis using High Performance Computing (parallel and vector features) to run Performance Computing. E. M. R. Fairbairn, E. Goulart, A. L. G. A. Coutinho, N. F. F. Ebecken COPPEDurability Assessment of an Arch Dam using Inverse Analysis with Neural Networks and High

Coutinho, Alvaro L. G. A.

355

EA-1994: Malheur Resource Area Jonesboro Diversion Dam Replacement Project, Malheur County, Oregon  

Broader source: Energy.gov [DOE]

The Bureau of Land Management, with the Bonneville Power Administration (BPA) as a cooperating agency, prepared an EA that assesses the potential environmental impacts of the proposed authorization of a right of way to the Burns Paiute Tribe for replacement of an existing diversion dam and installation of a fish passage structure. BPA’s proposed action was to fund the project

356

EIFAC 2006: DAMS, WEIRS AND FISH Long-term effects of hydropower installations  

E-Print Network [OSTI]

EIFAC 2006: DAMS, WEIRS AND FISH Long-term effects of hydropower installations and associated river on stocking lakes with elvers and fingerling eels. These were trapped at the hydropower facilities.) stocks is a matter of great concern and Guest editors: R. L. Welcomme & G. Marmulla Hydropower, Flood

McCarthy, T.K.

357

Analysis of Seismic Activity near Theodore Roosevelt Dam, Arizona, during the Occupation  

E-Print Network [OSTI]

E Analysis of Seismic Activity near Theodore Roosevelt Dam, Arizona, during the Occupation, and Lepolt Linkimer Online Material: Plot of viable focal mechanisms and table of regional seismic velocity model. INTRODUCTION Rate and distribution of seismic activity are important indica- tors of the overall

Fouch, Matthew J.

358

Seismic vulnerability assessment to slight dam-age based on experimental modal parameters  

E-Print Network [OSTI]

Seismic vulnerability assessment to slight dam- age based on experimental modal parameters Clotaire Federal Institute of Technology, Zuerich, Switzerland. Michel C., Gueguen P., Causse M. 2011. Seismic higher modes and full seismic ground motion, (2) using a single-degree of freedom model considering

Paris-Sud XI, Université de

359

Ice storm impacts on woody debris and debris dam formation in northeastern U.S. streams  

E-Print Network [OSTI]

Ice storm impacts on woody debris and debris dam formation in northeastern U.S. streams Clifford E and associated streams. During 1999 and 2000, tree canopy damage, stream physical habitat, and wood deposition were evaluated within 51 first-, second-, and third-order streams located within five eastern

Kraft, Clifford E.

360

LEAKAGE THROUGH GEOSYNTHETIC DAM LINING SYSTEMS Christine T. Weber, The University of Texas at Austin  

E-Print Network [OSTI]

clay liner (e.g. 10-9 m/s). In spite of their function as hydraulic barriers, geomembrane liners shouldLEAKAGE THROUGH GEOSYNTHETIC DAM LINING SYSTEMS Christine T. Weber, The University of Texas was conducted to quantify leakage through a geomembrane liner system when subjected to high hydraulic heads

Zornberg, Jorge G.

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

The influence of large dams on surrounding climate and precipitation patterns  

E-Print Network [OSTI]

reports that large dams influence local climate most in Mediterranean, and semiarid climates, while in impounded basins of the Mediterranean and arid climates of the United States. Citation: Degu, A. M., F, then it is physically plausible to expect a gradual change in the local climate and rainfall patterns in the impounded

Niyogi, Dev

362

FACTORS FOR DECLINE 3.4.5 EFFECTS OF HYDROELECTRIC DAMS ON VIABILITY OF WILD FISH  

E-Print Network [OSTI]

FACTORS FOR DECLINE 3.4.5 EFFECTS OF HYDROELECTRIC DAMS ON VIABILITY OF WILD FISH The existence and operation of the Columbia River Hydrosystem poses risks to wild populations of anadromous salmonids. Run-tagged hatchery fish or a mixture of hatchery and wild fish are used as indicator stocks. In the Snake River

363

Department of Mechanical Engineering Spring 2011 General Motors 2 Variable Height Vehicle Air Dam  

E-Print Network [OSTI]

economy and aerodynamic drag requirements. Therefore we are required to use our creativity and figure out to increase the fuel economy of a particular vehicle at highway speeds. The dam must successfully divert air existing products and patents · Brainstorming, concept generation, refinement and selection · NO SITE VISIT

Demirel, Melik C.

364

PORTFOLIO RISK ASSESSMENT OF SA WATER'S LARGE DAMS by David S. Bowles1  

E-Print Network [OSTI]

PORTFOLIO RISK ASSESSMENT OF SA WATER'S LARGE DAMS by David S. Bowles1 , Andrew M. Parsons2 , Loren R. Anderson3 and Terry F. Glover4 ABSTRACT This paper summarises the Portfolio Risk Assessment (PRA and an initial prioritisation of future investigations and possible risk reduction measures. The PRA comprised

Bowles, David S.

365

Southwest Gas Corporation- Combined Heat and Power Program  

Broader source: Energy.gov [DOE]

Southwest Gas Corporation (SWG) offers incentives to qualifying commercial and industrial facilities who install efficient Combined Heat and Power systems (CHP). CHP systems produce localized, on...

366

Alternative Energy Projects by Rural Electric Membership Corporations (Indiana)  

Broader source: Energy.gov [DOE]

This legislation encourages the development of alternative energy projects using clean or renewable resources by rural electric membership corporations. The section establishes the Office of...

367

2008_Transition_Corporate_Overview_Book_One.pdf | Department...  

Broader source: Energy.gov (indexed) [DOE]

2008TransitionCorporateOverviewBookOne.pdf More Documents & Publications DOE Transition Documents - 2008 DOE Organization Chart - May 2, 2014 DOE Organization Chart - October...

368

Corporate Clean Energy Investment Trends in Brazil, China, India...  

Open Energy Info (EERE)

Brazil, China, India and South Africa Jump to: navigation, search Name Corporate Clean Energy Investment Trends in Brazil, China, India and South Africa AgencyCompany...

369

Electric, Street Railway, and Gas Corporations (South Dakota)  

Broader source: Energy.gov [DOE]

This legislation contains provisions pertaining to a corporation formed for the purpose of constructing, maintaining and operating a street railway or railways; generating, transmitting or...

370

azure dynamics corporation: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Coverage of Students on Medically Necessary Leave of Absence 116 Navneet Gulati Eaton Corporation, Engineering Websites Summary: autonomy to human-scale power-comparable...

371

Corn Belt Energy Corporation- Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov [DOE]

Corn Belt Energy Corporation (CBEC), in association with the Wabash Valley Power Association, provides its customers with the "Power Moves" energy efficiency rebate program. Through this program,...

372

Preliminary Notice of Violation, Fluor Daniel Fernald Corporation...  

Broader source: Energy.gov (indexed) [DOE]

July 29, 1997 Issued to Fluor Daniel Fernald Corporation related to Corrective Actions Implementation Deficiencies at the Fernald Environmental Management Project, (EA-97-05) On...

373

Accounting for Taste: Board Member Preferences and Corporate Policy Choices  

E-Print Network [OSTI]

This paper explores whether firms that share common directors also pursue similar corporate policies. Using a sample of 885 U.S. firms with common directors, we find ...

Richardson, Scott

2003-05-23T23:59:59.000Z

374

EERE Partner Testimonials- Robert Gleason, Capstone Turbine Corporation  

Broader source: Energy.gov [DOE]

Robert Gleason, Senior Vice President of Product Development for Capstone Turbine Corporation describes the benefits of a strategic partnership with the U.S. Department of Energy.

375

EERE Partner Testimonials- Darren Jamison, Capstone Turbine Corporation  

Broader source: Energy.gov [DOE]

Darren Jamison, President and CEO of Capstone Turbine Corporation, shares his experience of partnering with the U.S. Department of Energy.

376

Southwest Gas Corporation- Commercial Energy Efficient Equipment Rebate Program  

Broader source: Energy.gov [DOE]

Southwest Gas Corporation (SWG) offers rebates to commercial customers in Nevada who purchase energy efficient natural gas equipment. Eligible equipment includes clothes washers, storage water...

377

Southwest Gas Corporation- Commercial High-Efficiency Equipment Rebate Program  

Broader source: Energy.gov [DOE]

Southwest Gas Corporation (SWG) offers rebates to commercial customers in Arizona who purchase energy efficient natural gas equipment. Eligible equipment includes natural gas storage and tankless...

378

Southwest Gas Corporation- Residential and Builder Efficiency Rebate Program (Arizona)  

Broader source: Energy.gov [DOE]

Southwest Gas Corporation (SWG) offers rebates to residential customers in Arizona who purchase and install energy efficient natural gas tankless water heaters, clothes dryers, windows, attic...

379

Compliance Monitoring of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead Survival and Passage at John Day Dam, 2012  

SciTech Connect (OSTI)

The purpose of this compliance study was to estimate dam passage survival of yearling and subyearling Chinook salmon and steelhead smolts at John Day Dam during the spring and summer outmigrations in 2012. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 for spring migrants and greater than or equal to 0.93 for summer migrants, estimated with a standard error (SE) less than or equal to 0.015. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 3 km downstream of the dam, as well as the forebay residence time, tailrace egress time, spill passage efficiency (SPE), and fish passage efficiency (FPE), as required in the Columbia Basin Fish Accords (Fish Accords). A virtual/paired-release design was used to estimate dam passage survival at John Day Dam. The approach included releases of smolts, tagged with acoustic micro-transmitters, above John Day Dam that contributed to the formation of a virtual release at the face of John Day Dam. A survival estimate from this release was adjusted by a paired release below John Day Dam. A total of 3376 yearling Chinook salmon, 5726 subyearling Chinook salmon, and 3239 steelhead smolts were used in the virtual releases. Sample sizes for the below-dam paired releases (R2 and R3, respectively) were 997 and 995 for yearling Chinook salmon smolts, 986 and 983 for subyearling Chinook salmon smolts, and 1000 and 1000 for steelhead smolts. The Juvenile Salmon Acoustic Telemetry System (JSATS) tags were manufactured by Advanced Telemetry Systems. Model SS300 tags, weighing 0.304 g in air, were surgically implanted in yearling and subyearling Chinook salmon, and Model SS130 tag, weighing 0.438 g in air, were surgically implanted in juvenile steelhead for this investigation. The intent of the spring study was to estimate dam passage survival during both 30% and 40% spill conditions. The two spill conditions were to be systematically performed in alternating 2-day test intervals over the course of the spring outmigration. High flow conditions in 2012 interrupted the spill study. Dam passage survival was therefore estimated season-wide regardless of spill conditions.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Weiland, Mark A.; Woodley, Christa M.; Hughes, James S.; Ploskey, Gene R.; Deng, Zhiqun; Carlson, Thomas J.

2013-05-01T23:59:59.000Z

380

Chapter 2Chapter 2 A Complete CorporateA Complete Corporate  

E-Print Network [OSTI]

average cost of capital (WACC) Estimate expected future free cash flows (FCF)(FCF) Find value of company investors called the weightedinvestors--called the weighted average cost of capital (WACC) DES Chapter 2 13 #12;Steps in the corporate value model Determine weighted average cost of capitalDetermine weighted

Schubart, Christoph

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Corporate Fellows Council | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to User GroupInformationE-GovNatural Gas Usage FormCorporate Fellows

382

Lithium Technology Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpInc Place:KeystoneSolarList ofPassiveMachineBalance JumpCorporation

383

Corporate International Operations | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160Benin:EnergyWisconsin:2003) |Cordova Electric Coop, IncKilauea Name: Corporate

384

Diversified Energy Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump to:52c8ff988c1Dering Harbor,DiscountDiversified Energy Corporation Jump to:

385

Workplace Charging Challenge Partner: Sears Holdings Corporation |  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarlyEnergyDepartment ofDepartment of EnergyofDepartment of Energy Sears Holdings Corporation

386

Applied Films Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300AlgoilEnergy Information the Army Permit:Films Corporation Jump to:

387

HydroChina Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORTOpen EnergyBoard"Starting a new pageHuadeHydroChina Corporation

388

Schering Plough Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant ofRichardton AbbeyA Jump to:Schering Plough Corporation Jump to:

389

Sound Geothermal Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd Jump to:InformationSolergyAddison,Souderton,Geothermal Corporation Jump

390

Vu1 Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300 South Place: Salt Lake City,Division of OilGuyane Jump to:Vu1 Corporation

391

Jupiter Oxygen Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429 Throttled (botOpen6 Climate ZoneJeromeCounty isJupiter Oxygen Corporation

392

Verenium Corporation (Massachusetts) | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectric Coop,Save Energy NowNew HampshireValero RefiningCorporation

393

Bhoruka Power Corporation Ltd | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartmentAUDIT REPORT Americium/CuriumSunways JV Jump to:Bhoruka Power Corporation Ltd Jump

394

StarSolar Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd JumpGTZHolland,0162112°,St.Stanly County, NorthStarSolar Corporation Jump

395

SunPower Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen, Minnesota:36052°, -97.6114217°SunEnergy Power CorpSunOneCorporation

396

Technology Ventures Corporation TVC | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,Ltd Jump to:Taos County, NewTechnologiekontor BremerhavenCorporation

397

Empire Natural Gas Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It is classifiedProject) |Emeryville,Empire Natural Gas Corporation Place:

398

EnerVault Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It is classifiedProject)EnerVault Corporation Jump to: navigation, search

399

IST Energy Corporation | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat Jump to:PhotonHolyName HousingIIIDrive LtdINDEX JumpISE CorporationIST

400

Dead Hand and No Hand Pills: Precommitment Strategies in Corporate Law  

E-Print Network [OSTI]

Decisionmaking in Corporate Governance, 55 V AND . L. R EV .Dooley, Two Models of Corporate Governance, 47 B US . L AW .resurgence of the corporate governance issues that dominated

Bainbridge, Stephen M

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

The Shareholder As Ulysses: Some Empirical Evidence on Why Investors in Public Corporations Tolerate Board Governance  

E-Print Network [OSTI]

default rules of corporate governance at all, they almostThe Means and Ends of Corporate Governance, 97 N W . U. L. Rof the way modern corporate governance actually works. In

Stout, Lynn A.

2003-01-01T23:59:59.000Z

402

Anglo-American Corporate Taxation: Tracing the Common Roots of Divergent Approaches  

E-Print Network [OSTI]

History and the Global Corporate Governance Revolution: Thelength structure of corporate governance, the U.K. continuedarm’s-length form of corporate governance in the U.K. was

Bank, Steven A.

2013-01-01T23:59:59.000Z

403

Software & Services Group Developer Products Division Copyright 2011, Intel Corporation. All rights reserved.  

E-Print Network [OSTI]

Software & Services Group Developer Products Division Copyright© 2011, Intel Corporation. All & Services Group Developer Products Division Copyright© 2011, Intel Corporation. All rights reserved. *Other Division Copyright© 2011, Intel Corporation. All rights reserved. *Other brands and names are the property

California at Berkeley, University of

404

Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003  

SciTech Connect (OSTI)

This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

2005-02-01T23:59:59.000Z

405

The Earth Institute I Corporate Circle Spring 2011  

E-Print Network [OSTI]

,000 in unrestricted support, to be renewed once a year · Support the on-going sustainable development work on strategic plans, metrics, operations as relates to energy, water, sustainable food systems, etc. · Corporate #12;The Earth Institute I Corporate Circle Indicative examples Global: · PepsiCo: water & energy

Khatiwala, Samar

406

Copyright 1997 by Rational Software Corporation Analysis and Design  

E-Print Network [OSTI]

Page 1 Copyright © 1997 by Rational Software Corporation Analysis and Design with UML Page 2 Copyright © 1997 by Rational Software Corporation Agenda n Benefits of Visual Modeling n History of the UML n Visual Modeling with UML n The Rational Iterative Development Process #12;Page 3 Copyright © 1997

Mylopoulos, John

407

Industrial Engineering 361 Six Sigma Making Corporations and  

E-Print Network [OSTI]

Industrial Engineering 361 Six Sigma ­ Making Corporations and Stockholders... Kim Knuth Grant in the late 1980's. The term "Six Sigma" came to identify a popular form of corporate improvement://www.public.iastate.edu/~vardeman/stat531/sixsigma.pdf). Before we began research, we questioned the importance of Six Sigma and were

Vardeman, Stephen B.

408

Corporate governance reform in a developing country : the case of Bangladesh   

E-Print Network [OSTI]

Bangladesh reformed its corporate governance by adopting Bangladesh Corporate Governance Guidelines-2006 (the BCGG-2006 hereafter) due to pressures from international financial institutions (IFIs). However, there is huge ...

Sobhan, Md. Abdus

2014-07-02T23:59:59.000Z

409

IS THE TAIL WAGGING THE DOG? AN EMPIRICAL ANALYSIS OF CORPORATE CARBON FOOTPRINTS AND FINANCIAL PERFORMANCE  

E-Print Network [OSTI]

The importance of carbon footprint estimation boundaries.ANALYSIS OF CORPORATE CARBON FOOTPRINTS AND FINANCIALANALYSIS OF CORPORATE CARBON FOOTPRINTS AND FINANCIAL

Delmas, Magali A; Nairn-Birch, Nicholas S.

2011-01-01T23:59:59.000Z

410

The effect of a corporate name change related to a change in corporate image upon a firm's stock price  

E-Print Network [OSTI]

change to the corporate name during a CNC related to a change in corporate image? Third, what is the effect of a non-brand name altering CNC versus a brand name altering CNC on a firm’s stock price? This dissertation makes its primary contribution...

DeFanti, Mark P.

2009-06-02T23:59:59.000Z

411

The Feasibility of Using an Ultrasonic Fish Tracking System in the Tailrace of Lower Granite Dam in 2002  

SciTech Connect (OSTI)

This report describes a study conducted by PNNL in Spring 2002 at Lower Granite Dam on the Snake River for the US Army Corps of Engineers Portland District. Our goal was to determine the feasibility of using ultrasonic fish tracking in the untested environment of a hydroelectric dam tailrace. If fish tracking were determined to be feasible, we would track the movement of juvenile hatchery chinook (Oncorhynchus tshawytscha), juvenile hatchery steelhead (O. mykiss), and juvenile wild steelhead (O. mykiss) and relate their movement to dam operations. The majority of fish to be tracked were released as a part of a separate study conducted by the Biological Resources Division of the U.S. Geological Survey (BRD), which was investigating the movement of juvenile salmon in the forebay of Lower Granite Dam in relation to Removable Spillway Weir (RSW) testing. The two studies took place consecutively from April 14 to June 7, 2002.

Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.; Cash, Kenneth; Zimmerman, Shon A.

2003-09-10T23:59:59.000Z

412

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at John Day Dam, Spring 2010  

SciTech Connect (OSTI)

The purpose of this study was to compare dam passage survival, at two spill treatment levels, of yearling Chinook salmon and steelhead smolts at John Day Dam during spring 2010. The two treatments were 30% and 40% spill out of total project discharge. Under the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp), dam passage survival should be greater than or equal to 0.96 and estimated with a standard error (SE) less than or equal 0.015. The study also estimated forebay residence time, tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. However, by agreement among the stakeholders, this study was not an official BiOp compliance test because the long-term passage measures at John Day Dam have yet to be finalized and another year of spill-treatment testing was desired.

Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Skalski, J. R.; Townsend, Richard L.

2012-11-15T23:59:59.000Z

413

Mitigation for the Construction and Operation of Libby Dam, 2000 Annual Report.  

SciTech Connect (OSTI)

''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.

Hoffman, Greg; Marotz, Brian L.; Dunnigan, James (Montana Department of Fish, Wildlife and Parks, Libby, MT)

2002-09-01T23:59:59.000Z

414

Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

2012-09-01T23:59:59.000Z

415

Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

2011-12-01T23:59:59.000Z

416

Survival and Passage of Yearling and Subyearling Chinook Salmon and Juvenile Steelhead at McNary Dam, 2012  

SciTech Connect (OSTI)

The study was designed to evaluate the passage and survival of yearling and subyearling Chinook salmon and juvenile steelhead at McNary Dam as stipulated by the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a virtual/paired-release model. This study supports the USACE’s continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Hughes, James S.; Weiland, Mark A.; Woodley, Christa M.; Ploskey, Gene R.; Carpenter, Scott M.; Hennen, Matthew J.; Fischer, Eric S.; Batton, George; Carlson, Thomas J.; Cushing, Aaron W.; Deng, Zhiqun; Etherington, D. J.; Fu, Tao; Greiner, Michael J.; Ingraham, John M.; Kim, Jin A.; Li, Xi; Martinez, Jayson J.; Mitchell, T. D.; Rayamajhi, Bishes; Seaburg, Adam; Skalski, J. R.; Townsend, Richard L.; Wagner, Katie A.; Zimmerman, Shon A.

2013-12-23T23:59:59.000Z

417

Scientific substantiation of safe operation of the Earthen Dams at the Votkinsk HPP  

SciTech Connect (OSTI)

Over a period of 15 years, coworkers of the B. E. Vedeneev Scientific-Research Institute of Hydraulic Engineering have conducted scientific accompaniment of the operation of the earthen dams at the Votkinsk HPP. During that time, basic performance characteristics associated with complex hydrogeologic and hydrochemical conditions, and the forms of their unfavorable manifestations influencing the reliability and safety of the structures were revealed, and, recommendations and measures were developed for their elimination.

Deev, A. P.; Fisenko, V. F. [Votkinsk HPP Branch of the JSC 'RusGidro,' Chaikovskii (Russian Federation); Sol'skii, S. V.; Lopatina, M. G.; Gints, A. V.; Aref'eva, A. N. [JSC 'VNIIG im. B. E. Vedeneeva', Branch of JSC 'RusGidro' (Russian Federation)

2012-11-15T23:59:59.000Z

418

Design Tools to Assess Hydro-Turbine Biological Performance: Priest Rapids Dam Turbine Replacement Project  

SciTech Connect (OSTI)

Over the past two decades, there have been many studies describing injury mechanisms associated with turbine passage, the response of various fish species to these mechanisms, and the probability of survival through dams. Although developing tools to design turbines that improve passage survival has been difficult and slow, a more robust quantification of the turbine environment has emerged through integrating physical model data, fish survival data, and computational fluid dynamics (CFD) studies. Grant County Public Utility District (GCPUD) operates the Priest Rapids Dam (PRD), a hydroelectric facility on the Columbia River in Washington State. The dam contains 10 Kaplan-type turbine units that are now almost 50 years old. The Utility District plans to refit all of these aging turbines with new turbines. The Columbia River at PRD is a migratory pathway for several species of juvenile and adult salmonids, so passage of fish through the dam is a major consideration when replacing the turbines. In this presentation, a method for turbine biological performance assessment (BioPA) is introduced. Using this method, a suite of biological performance indicators is computed based on simulated data from a CFD model of a proposed turbine design. Each performance indicator is a measure of the probability of exposure to a certain dose of an injury mechanism. Using known relationships between the dose of an injury mechanism and frequency of injury (dose–response) from laboratory or field studies, the likelihood of fish injury for a turbine design can be computed from the performance indicator. By comparing the values of the indicators from proposed designs, the engineer can identify the more-promising alternatives. We will present application of the BioPA method for baseline risk assessment calculations for the existing Kaplan turbines at PRD that will be used as the minimum biological performance that a proposed new design must achieve.

Richmond, Marshall C.; Rakowski, Cynthia L.; Serkowski, John A.; Strickler, Brad; Weisbeck, Molly; Dotson, Curtis L.

2013-06-25T23:59:59.000Z

419

Framing India's Hydraulic Crises The Politics of the Modern Large Dam  

E-Print Network [OSTI]

Framing India's Hydraulic Crises The Politics of the Modern Large Dam ROHAN D'SOUZA For several University Press, 2006). #12;I N D I A ' S H Y D R A U L I C C R I S I S 1 1 3 commentator on India, declared landscape.4 The TVA model was soon to mark a profound hydraulic departure by kick-starting the post

Sussex, University of

420

Oxygenation cost estimates in 1983 dollars for Cherokee and Douglas Dams  

SciTech Connect (OSTI)

As part of the Reservoir Releases Program, estimates of costs associated with providing high purity oxygen injection systems at Cherokee and Douglas Dams were computed in 1983 dollars. This report presents results of the computations. An 8.125% interest rate, a 25-year economic life, and a 10-year diffuser life were assumed. Weekly average dissolved oxygen concentration (DO) and turbine flowrate data were available for the years 1958 through 1980. 4 refs., 6 figs., 3 tabs.

Fain, T.G.; Boyd, J.W.

1983-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay  

SciTech Connect (OSTI)

This report documents the third year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes).

Simmons, Mary Ann; Johnson, Robert L.; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

2004-01-01T23:59:59.000Z

422

Alternatives for physically modifying John Sevier detention dam to allow fish passage  

SciTech Connect (OSTI)

Studies conducted in the vicinity of John Sevier Steam-Electric Plant (JSF) indicated some modification of the fish assemblage from that expected. By blocking movements of fish between Cherokee Reservoir and the upper Holston River, John Sevier detention dam has affected the fisheries in both systems. Providing passage for river-spawning fish at John Sevier detention dam might improve fish communities and fisheries in Cherokee Reservoir as well as upstream habitats. This would include enhanced reproductive success of river-spawning species found in Cherokee Reservoir (e.g., white bass and possibly striped bass and paddlefish) and repopulation of John Sevier Reservoir and the upper Holston River by several species presently found only downstream of the detention dam. TVA has identified and studied several alternatives that alone or in combination might improve the fisheries. Cost estimates were developed for three alternatives. These three alternatives with cost estimates are discussed briefly along with two other alternatives for which cost estimates have not been made. Merits of the three alternatives which have at least some possibility to improve migratory fish stocks are discussed in detail. 5 references.

Not Available

1984-09-01T23:59:59.000Z

423

Lower Granite Dam Smolt Monitoring Program, 2003-2004 Annual Report.  

SciTech Connect (OSTI)

The 2003 fish collection season at Lower Granite Dam Juvenile Fish Facility (LGR) was characterized by water temperatures, total flows and spill that were below the five year average, low levels of debris, and increased smolt collection numbers compared to 2002 with the exception of unclipped sockeye/kokanee. There were 6,183,825 juvenile salmonids collected. Of these, 6,054,167 were transported to release sites below Bonneville Dam, 5,957,885 by barge and 96,282 by truck. An additional 102,340 fish were bypassed back to the river, primarily due to research projects with another 62,122 bypassed through the PIT-tag bypass system. According to the PTAGIS database, 152,268 PIT-tagged fish were detected at Lower Granite Dam. Of these, Smolt Monitoring Staff recorded 345 PIT-tagged raceway and sample mortalities. Of the 6,183,825 total fish collected, 113,290 were PIT-tagged or radio tagged and 380 were sacrificed by researchers. The collection included 836,885 fish that had hatchery marks other than clipped fins (elastomer, freeze brands or Coded Wire Tags). An estimated 54,857 incidental fish were collected with an additional 8,730 adult salmonids removed from the separator.

Mensik, Fred; Rapp, Shawn; Ross, Doug

2004-08-01T23:59:59.000Z

424

Unsteady flow model of Priest Rapids Dam releases at Hanford Reach, Columbia River, Washington  

SciTech Connect (OSTI)

A model was developed to simulate water levels at three locations on the Columbia River between Priest Rapids Dam River Mile 396.1 (River Kilometer 639.0) and River Mile 361.50 (River Kilometer 581.7). The model was calibrated and verified over a range of flows. The results of calibration and verification indicate that the model, with reasonable accuracy, simulates stages to within +-0.08 m (+- 0.25 ft) and surface wave timing to within +-20 min. The model can be used by researchers, river system managers, planners, and decision makers as a tool to predict fluctuating water levels at locations downstream of dams. Data produced by the model can be used to evaluate and quantify possible impacts on aquatic organisms, water supply, navigation, irrigation, recreation, and additional hydropower enhancement. Although the results of this model calibrationand the model simulations presented are site-specific, the methodology is generic. Therefore, the model can be adapted to reflect dam discharges and resulting river flows at other river systems affected by water-level fluctuations.

Sneider, S.C.; Skaggs, R.L.

1983-02-01T23:59:59.000Z

425

Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.  

SciTech Connect (OSTI)

''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.

Dunnigan, James; DeShazer, Jay; Garrow, Larry (Montana Department of Fish, Wildlife and Parks, Libby, MT)

2005-06-01T23:59:59.000Z

426

Comment submitted by Whirlpool Corporation regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by Whirlpool Corporation regarding the Energy Star Verification Testing Program

427

Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam Sluiceway, 2005  

SciTech Connect (OSTI)

The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate fish passage at The Dalles Dam powerhouse in 2005. The goal of the study was to provide information on smolt passage that will inform decisions on long-term measures and operations to enhance sluiceway passage and reduce turbine passage to improve smolt survival at the dam. The study addressed one of the main programs dedicated to improving juvenile salmonid survival at The Dalles Dam: Surface Flow Bypass. The study objectives (see below) were met using a combination of hydroacoustic and hydraulic data. The study incorporated fixed-location hydroacoustic methods across the entire powerhouse, with especially intense sampling using multiple split-beam transducers at all sluiceway portals. We did not sample fish passage at the spillway in 2005. In the sluiceway nearfield, we used an acoustic camera to track fish movements. The fish data were interpreted with hydraulic data from a computational fluid dynamics (CFD) model. Fish passage data were collected in the framework of an “experiment” using a randomized block design (3-day treatments; two treatments) to compare two sluiceway operational configurations: Sluice 2+5 and Sluice 2+19 (six gates open for each configuration). Total project outflow was 76% of the 10-year average for spring and 71% of the 10-year average for summer. Based on these findings, we make the following recommendations: 1) The sluice should be operated 24 h/d from April until November. 2) Open six rather than three sluice gates to take advantage of the maximum hydraulic capacity of the sluiceway. 3) Open the three gates above the western-most operating main turbine unit and the three gates at MU 8 where turbine passage rates are relatively high. 4) Operate the turbine units below open sluice gates as a standard fish operations procedure. 5) Develop hydraulic and entrance enhancements to the sluiceway to tap the potential of The Dalles Dam sluiceway to be highly efficient and effective at passing juvenile salmonids. 6) Consider the following elements for surface flow bypasses during design of any sluiceway enhancements at The Dalles Dam: Form an extensive surface flow bypass flow net (surface bypass discharge greater than ~7% of total project discharge) at both west and east ends of the dam; Create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration < 1 m/s per meter); Make water velocities at an entrance high enough (> 3 m/s) to entrain the subject juvenile fishes, e.g., 10,000 cfs or so; Adapt the shape and orientation of the surface entrance(s) to fit site-specific features, i.e., test a Removable Sluiceway Weir. 7)The Dalles Dam sluiceway has potential to be highly efficient and effective at passing juvenile salmonids. We recommend tapping this potential with enhancements to the sluiceway.

Johnson, Gary E.; Khan, Fenton; Hedgepeth, J; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Serkowski, John A.; Skalski, John R.

2006-06-01T23:59:59.000Z

428

Hydroacoustic Evaluation of Juvenile Salmonid Passage and Distribution at Lookout Point Dam, 2010  

SciTech Connect (OSTI)

This report presents the results of an evaluation of juvenile salmonid passage and distribution at Lookout Point Dam (LOP) on the Middle Fork Willamette River. The study was conducted by the Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers, Portland District (USACE). The goal of the study was to provide fish passage and distribution data to support decisions on long-term measures to enhance downstream passage at LOP and others dams in USACE’s Willamette Valley Project in response to the listing of Upper Willamette River Spring Chinook salmon (Oncorhynchus tshawytscha) and Upper Willamette River steelhead (O. mykiss) as threatened under the Endangered Species Act. During the year-long study period - February 1, 2010 to January 31, 2011the objectives of the hydroacoustic evaluation of fish passage and distribution at LOP were to: 1. Estimate passage rates, run timing, horizontal distribution, and diel distribution at turbine penstock intakes for smolt-size fish. 2. Estimate passage rates, run timing and diel distribution at turbine penstock intakes for small-size fish. 3. Estimate passage rates and run timing at the regulating outlets for smolt-size fish. 4. Estimate vertical distribution of smolt-size fish in the forebay near the upstream face of the dam. The fixed-location hydroacoustic technique was used to accomplish the objectives of this study. Transducers (420 kHz) were deployed in each penstock intake, above each RO entrance, and on the dam face; a total of nine transducers (2 single-beam and 7 split-beam) were used. We summarize the findings from the hydroacoustic evaluation of juvenile salmonid passage and distribution at LOP during February 2010 through January 2011 as follows. • Fish passage rates for smolt-size fish (> ~90 mm) were highest during December-January and lowest in mid-summer through early fall. • During the entire study period, an estimated total of 142,463 fish ± 4,444 (95% confidence interval) smolt-size fish passed through turbine penstock intakes. • Diel periodicity of smolt-size fish showing crepuscular peaks was evident in fish passage into turbine penstock intakes. • Run timing for small-size fish (~65-90 mm) peaked (702 fish) on December 18. Downstream passage of small-size juvenile fish was variable, occurring on two days in the spring, eight days in the summer, and at times throughout late fall and winter. A total of 7,017 ± 690 small-size fish passed through the turbine penstock intakes during the study period. • Relatively few fish passed into the ROs when they were open in summer (2 fish/d) and winter (8 fish/d). • Fish were surface-oriented with 62-80% above 10 m deep. The highest percentage of fish (30-60%) was in the 5-10 m depth bin. We draw the following conclusions from the study. • The non-obtrusive hydroacoustic data from this study are reliable because passage estimates and patterns were similar with those observed in the direct capture data from the tailrace screw trap and were consistent with distribution patterns observed in other studies of juvenile salmonid passage at dams. • Fish passage at LOP was apparently affected but not dominated by dam operations and reservoir elevation. • The surface-oriented vertical distribution of fish we observed supports development of surface passage or collector devices. In summary, the high-resolution spatially and temporally data reported herein provide detailed estimates of vertical, horizontal, diel, daily, and seasonal passage and distributions at LOP during March 2010 through January 2011. This information is applicable to management decisions on design and development of surface passage and collections devices to help restore Chinook salmon populations in the Middle Fork Willamette River watershed above Lookout Point Dam.

Khan, Fenton; Johnson, Gary E.; Royer, Ida M.; Hughes, James S.; Fischer, Eric S.; Trott, Donna M.; Ploskey, Gene R.

2011-07-01T23:59:59.000Z

429

Uncertain Growth Cycles, Corporate Investment, and Dynamic Hedging  

E-Print Network [OSTI]

Chowdhry. Resources, real options, and corporate strategy.not exist in standard real option models: When invest- mentIn the theory of real options, uncertainty plays a crucial

Yonce, Adam

2010-01-01T23:59:59.000Z

430

Hindawi Publishing Corporation EURASIP Journal on Embedded Systems  

E-Print Network [OSTI]

Hindawi Publishing Corporation EURASIP Journal on Embedded Systems Volume 2009, Article ID 175043 Yassin El-Hillali,1 and Atika Rivenq-Menhaj1 1 Universit´e de Valenciennes et du Hainaut-Cambr´esis, ISTV

Boyer, Edmond

431

Essays on banking and corporate finance in developing countries  

E-Print Network [OSTI]

This dissertation consists of three essays that examine banking and corporate finance in developing countries. Specifically, it explores the theoretical and empirical implications of open capital markets, foreign bank ...

Gormley, Todd A

2006-01-01T23:59:59.000Z

432

THREE ESSAYS ON MONITORING OF FINANCIAL REPORTING BY CORPORATE DIRECTORS  

E-Print Network [OSTI]

Recent high-profile financial scandals and increasing instances of restatements focus public attention on the role of audit committees, auditors and CFOs in maintaining the integrity and quality of corporate financial ...

Xu, Yang

2012-08-31T23:59:59.000Z

433

Corporate budgeting In practice : driving strategic focus and performance  

E-Print Network [OSTI]

This paper identifies insights and methods used in practice to address two weaknesses in the traditional corporate budgeting process. One point of failure is the weak linkage between organizational strategy and budgeting ...

Briggman, Chandra A. (Chandra Alisa)

2014-01-01T23:59:59.000Z

434

Aeronautics Test Program (ATP) Corporate Management of Aeronautical Facilities  

E-Print Network [OSTI]

Aeronautics Test Program (ATP) Corporate Management of Aeronautical Facilities 44th AIAA Aerospace Propulsion Systems Lab. 3 & 4 · Glenn 10x10 Supersonic Tunnel ATP provides 60%- 75% of fixed costs #12

435

Creating an incentive for investor intermediaries to improve corporate governance  

E-Print Network [OSTI]

At the end of the 1980s, there was some speculation that leveraged buyouts (LBOs) would lead to the demise of the public company in favor of privately owned companies after a decade of the market for corporate control ...

Gershkowitz, Todd M

2006-01-01T23:59:59.000Z

436

Corporate Governance & The UK Split Capital Investment Trust Crisis   

E-Print Network [OSTI]

of corporate governance issues. This paper draws on the results of a survey of investment trust directors and other investment professionals connected with the investment trust industry to examine the lessons to be learned from the crisis. The regulatory...

Adams, Andrew T; Angus, Robin

2005-01-01T23:59:59.000Z

437

Board independence and corporate governance: evidence from director resignations  

E-Print Network [OSTI]

As evident from recent changes in NYSE and Nasdaq listing requirements, board independence is considered an important constituent of firms?? corporate governance structures. However, the empirical evidence regarding the impact of board structure...

Gupta, Manu

2005-08-29T23:59:59.000Z

438

Corporate governance and long-term stock returns  

E-Print Network [OSTI]

Extant literature finds that long-term abnormal stock returns are generated by a strategy based on corporate governance index values (Gompers, Ishii, and Metrick 2003). The result is inconsistent with efficient markets and suggests that information...

Moorman, Theodore Clark

2005-08-29T23:59:59.000Z

439

Buildings and corporate strategy : towards a management system model  

E-Print Network [OSTI]

This thesis focuses on buildings as a subject of attention and inquiry in a corporate setting. It attempts to draw implications for the design of a management system to deal with the special nature of buildings as a resource. ...

Brana, Rodrigo

1985-01-01T23:59:59.000Z

440

STATEMENT OF CONSIDERATIONS REQUEST BY PARKER HANNIFIN CORPORATION...  

Broader source: Energy.gov (indexed) [DOE]

HANNIFIN CORPORATION FOR AN ADVANCE WAIVER OF PATENT RIGHTS TO INVENTIONS MADE UNDER COOPERATIVE AGREEMENT NO. DE-FC26-06NT42648; W(A)-06-033, CH-1391 As set out in the...

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

STATEMENT OF CONSIDERATIONS REQUEST BY GENERAL MOTORS CORPORATION...  

Broader source: Energy.gov (indexed) [DOE]

ADVANCE WAIVER OF DOMESTIC AND FOREIGN INVENTION RIGHTS UNDER DOE COOPERATIVE AGREEMENT NO. DE-FC26-04NT42278; W(A)-04-070, CH-1248 The Petitioner, General Motors Corporation (GM)...

442

How Well Do Social Ratings Actually Measure Corporate Social Responsibility?*  

E-Print Network [OSTI]

environmental strengths, in contrast, do not accurately predict pollution levels or compliance violations. Levine Haas School of Business University of California at Berkeley 545 Student Services Building #1900 Responsibility? Abstract: Ratings of corporations' environmental activities and capabilities influence billions

Sadoulet, Elisabeth

443

UNDERSTANDING POSTAL PRIVATIZATION: CORPORATIONS, UNIONS AND "THE PUBLIC INTEREST"  

E-Print Network [OSTI]

1 UNDERSTANDING POSTAL PRIVATIZATION: CORPORATIONS, UNIONS AND "THE PUBLIC INTEREST" BY SARAH F Relations Written under the direction of Professor Adrienne Eaton and approved by ___________[Jeffrey Keefe]_____________ ____________[Dorothy Sue Cobble]____________ ____________[Adrienne Eaton]_____________ New Brunswick, New Jersey

444

Introduction: White-Collar and Corporate Crime in Asia  

E-Print Network [OSTI]

International Handbook of White-Collar and Corporate Crime.Japanese social structure and white collar crime: recruitG. (2007). Black Mist and White Collars: Economic Crime in

Pontell, Henry N.; Geis, Gilbert

2010-01-01T23:59:59.000Z

445

Corporate serial acquisitions: An empirical test of the learning hypothesis  

E-Print Network [OSTI]

2007/23 Corporate serial acquisitions: An empirical test of the learning hypothesis Nihat Aktas: An empirical test of the learning hypothesis Nihat AKTAS1, Eric DE BODT2 and Richard ROLL3 March2007 Abstract

Nesterov, Yurii

446

Fitting In: Extreme Corporate Wellness and Organizational Communication  

E-Print Network [OSTI]

, and (3) corporeal ethics. First, organizational culture, including espoused values and shared levels of assumptions, took on certain changes because of an emphasis on extreme fitness. Employee participation in CrossFit led to strict notions of strength...

James, Eric Preston

2014-07-31T23:59:59.000Z

447

Acoustic Telemetry Evaluation of Juvenile Salmonid Passage and Survival at John Day Dam with Emphasis on the Prototype Surface Flow Outlet, 2008  

SciTech Connect (OSTI)

The main purpose of the study was to evaluate the performance of Top Spill Weirs installed at two spillbays at John Day Dam and evaluate the effectiveness of these surface flow outlets at attracting juvenile salmon away from the powerhouse and reducing turbine passage. The Juvenile Salmonid Acoustic Telemetry System (JSATS) was used to estimate survival of juvenile salmonids passing the dam and also for calculating performance metrics used to evaluate the efficiency and effectiveness of the dam at passing juvenile salmonids.

Weiland, Mark A.; Ploskey, Gene R.; Hughes, James S.; Deng, Zhiqun; Fu, Tao; Monter, Tyrell J.; Johnson, Gary E.; Khan, Fenton; Wilberding, Matthew C.; Cushing, Aaron W.; Zimmerman, Shon A.; Faber, Derrek M.; Durham, Robin E.; Townsend, Richard L.; Skalski, John R.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.

2009-12-01T23:59:59.000Z

448

Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Dam Powerhouse 1  

SciTech Connect (OSTI)

This report describes a pilot study conducted by Tom Carlson of PNNL and Mark Weiland of MEVATEC Corp to test the feasibility of using light-emitting tags to visually track objects passing through the turbine environment of a hydroelectric dam. Light sticks were released at the blade tip, mid-blade, and hub in the MGR turbine and a Kaplan turbine at Bonneville Dam and videotaped passing thru the dam to determine visibility and object trajectories.

Carlson, Thomas J.; Weiland, Mark A.

2001-01-30T23:59:59.000Z

449

Synthesis of Sensor Fish Data for Assessment of Fish Passage Conditions at Turbines, Spillways, and Bypass Facilities – Phase 1: The Dalles Dam Spillway Case Study  

SciTech Connect (OSTI)

This report summarizes the characterization of spillway passage conditions at The Dalles Dam in 2006 and the effort to complete a comprehensive database for data sets from The Dalles Dam spillway Sensor Fish and balloon-tagged live fish experiments. Through The Dalles Dam spillway case study, Pacific Northwest National Laboratory (PNNL) researchers evaluated the database as an efficient means for accessing and retrieving system-wide data for the U.S Army Corps of Engineers (USACE).

Deng, Zhiqun; Serkowski, John A.; Fu, Tao; Carlson, Thomas J.; Richmond, Marshall C.

2007-12-31T23:59:59.000Z

450

Characterization of Fish Passage Conditions through the Fish Weir and Turbine Unit 1 at Foster Dam, Oregon, Using Sensor Fish, 2012  

SciTech Connect (OSTI)

This report documents investigations of downstream fish passage research involving a spillway fish weir and turbine passage conditions at Foster Dam in May 2012.

Duncan, Joanne P.

2013-02-01T23:59:59.000Z

451

Corporate governance under stress : an institutional perspective on the transformation of corporate governance in France and Germany  

E-Print Network [OSTI]

This work contributes to the study of comparative political economy by examining the impact of financial deregulation on corporate governance in the two main continental European economies, France and Germany. It investigates ...

Goyer, Michel, 1964-

2004-01-01T23:59:59.000Z

452

Reducing the Impacts of Hydroelectric Dams on Juvenile Anadromous Fishes: Bioengineering Evaluations Using Acoustic Imaging in the Columbia River, USA  

SciTech Connect (OSTI)

Dams impact the survival of juvenile anadromous fishes by obstructing migration corridors, lowering water quality, delaying migrations, and entraining fish in turbine discharge. To reduce these impacts, structural and operational modifications to dams— such as voluntary spill discharge, turbine intake guidance screens, and surface flow outlets—are instituted. Over the last six years, we have used acoustic imaging technology to evaluate the effects of these modifications on fish behavior, passage rates, entrainment zones, and fish/flow relationships at hydroelectric projects on the Columbia River. The imaging technique has evolved from studies documenting simple movement patterns to automated tracking of images to merging and analysis with concurrent hydraulic data. This chapter chronicles this evolution and shows how the information gleaned from the scientific evaluations has been applied to improve passage conditions for juvenile salmonids. We present data from Bonneville and The Dalles dams that document fish behavior and entrainment zones at sluiceway outlets (14 to 142 m3/s), fish passage rates through a gap at a turbine intake screen, and the relationship between fish swimming effort and hydraulic conditions. Dam operators and fisheries managers have applied these data to support decisions on operational and structural changes to the dams for the benefit of anadromous fish populations in the Columbia River basin.

Johnson, Gary E.; Ploskey, Gene R.; Hedgepeth, J.; Khan, Fenton; Mueller, Robert P.; Nagy, William T.; Richmond, Marshall C.; Weiland, Mark A.

2008-07-29T23:59:59.000Z

453

Mitigation for the Construction and Operation of Libby Dam, 2001-2002 Annual Report.  

SciTech Connect (OSTI)

Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to ''protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries...'' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May, 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to redevelop fisheries and fisheries habitat in basin streams and lakes.

Dunnigan, James L.; Marotz, Brian L.; DeShazer, Jay (Montana Department of Fish, Wildlife and Parks, Libby, MT)

2003-06-01T23:59:59.000Z

454

Development of age of dam and sex adjustment factors for preweaning traits of Brangus cattle  

E-Print Network [OSTI]

supplied on Brangus cattle enrolled in the BHIR by the IBBA. The data consisted of 103, 620 preweaning records from 1962 through 1988. Variables pertinent to the analyses were sire, age of dam, sex of calf, month of birth, year of birth, age at weaning... calf records reduced the data set size to approximately 55, 000 records. Further editing included records with birth weights less than 18. 14 kg and greater than 63. 50 kg, because calves outside of this weight range would be very rare or would...

Cravey, Matthew David

1989-01-01T23:59:59.000Z

455

The Distribution and Flux of Fish in the Forebay of The Dalles Dam in 2003  

SciTech Connect (OSTI)

In spring and summer 2003, the Pacific Northwest National Laboratory led a team that conducted mobile and fixed hydroacoustic surveys in the forebay of The Dalles Dam for the U.S. Army Corps of Engineers - Portland District, for the Anadromous Fish Evaluation Program. The surveys provided information on the distribution and movement of smolt-sized fish relative to ambient factors such as flow, bathymetry, or diel cycle in the forebay at The Dalles Dam. This information is intended to provide baseline data for the development of a surface bypass alternative for juvenile salmon at The Dalles Dam. We sampled the forebay of The Dallas Dam one day and night each week for six weeks in the spring and another six weeks in the summer. In general, during the day in the spring, the greatest densities of smolt-sized fish were observed in the thalweg of the main channel from the Washington bank, to the east side of the powerhouse, along the powerhouse, and concentrated in the areas next to the sluiceway. Fish density was lower on the Washington side of the river and west of mid-powerhouse (north spillway side). The spring night distribution was similar, with a few notable differences. The density of fish was high on the east side of the powerhouse and along the face of the powerhouse, and more fish were detected on the north spillway side. The distribution of sub-yearling sized fish in summer followed the same general patterns as spring, except that summer fish had a greater presence on the east side of the powerhouse and on the north spillway side. The vertical distribution of fish was also determined. In spring 80% of fish were above 5.6 m of depth during the day and above 4.7 m in the night. The summer fish were similarly distributed in the day and night with 80% of the fish in the upper 4.5 m and 4.7 m of the water column respectively. In general the smolt-sized fish were distributed deeper in the water column in the center of the channel than near the edges. The net movement of smolt-sized fish in the forebay from fixed-point samples appeared to be in a circular pattern, with fish moving with the flow and channel upstream of the powerhouse, and upstream at points near the powerhouse. The rate of fish movement (flux) was greatest at the east end of the powerhouse and on the upstream-north side of the channel.

Faber, Derrek M.; Hanks, Michael E.; Zimmerman, Shon A.; Skalski, John R.; Dillingham, Peter W.

2005-04-29T23:59:59.000Z

456

Hydroacoustic Evaluation of Juvenile Salmonid Passage at The Dalles Dam in 2004  

SciTech Connect (OSTI)

The U.S. Army Corps of Engineers Portland District engaged the Pacific Northwest National Laboratory to evaluate juvenile salmon passage at The Dalles Dam in 2004 to inform decisions about long-term measures and operations to enhance sluiceway and spill passage and reduce turbine passage to improve smolt survival at the dam. PNNL used fixed-location hydroacoustic sampling across the entire project, especially at the sluiceway and spillway, using multiple split-beam transducers at selected locations. At the sluiceway nearfield, we used an acoustic camera to track fish. The fish data were interpreted and integrated with hydraulic data from a CFD model and in-field ADCP measurements. Two sluiceway operations were compared: West only (SL 1) vs. West+East (SL 1 + SL 18). Based on our findings, we concluded that The Dalles Dam sluiceway has the potential to be highly efficient and effective at passing juvenile salmonids. This potential could be tapped with hydraulic and entrance enhancements to the sluiceway. We recommended the following: (1) six rather than three sluice gates should be opened to take advantage of the maximum hydraulic capacity of the sluiceway. (2) The turbine units below open sluice gates should be operated as a standard fish operations procedure. (3) In 2005, the Corps and fisheries agencies should consider operating sluice gates in one or more of the following combinations of six gates: (a) SL 1-1, 1-2, 1-3 and SL 18-1, 18-2, 18-3 (repeat 2004 operation), (b) SL 1-1, 1-2, 1-3 and SL 11-1, 11-2, 11-3, or (c) SL 1-1, 1-2, 1-3 and SL 2-1, 2-2, 2-3. The following elements for surface flow bypasses which should be considered during design of any sluiceway enhancements at The Dalles Dam: (1) form an extensive surface flow bypass flow net (surface bypass discharge greater than {approx}7% of total project discharge), (2) create a gradual increase in water velocity approaching the surface flow bypass (ideally, acceleration < 1 m/s/m), (3) make water velocities at an entrance high enough (> 3 m/s) to entrain the subject juvenile fishes, (4) adapt the shape and orientation of the surface entrance(s) to fit site-specific features, and (5) consider installing a forebay wall to increase fish availability to the surface flow bypass.

Johnson, Gary E.; Hanks, Michael E.; Khan, Fenton; Cook, Chris B.; Hedgepeth, J; Mueller, Robert P.; Rakowski, Cynthia L.; Richmond, Marshall C.; Sargeant, Susan L.; Serkowski, John A.; Skalski, John R.

2005-06-01T23:59:59.000Z

457

Simulation analysis of within-day flow fluctuation effects on trout below flaming Gorge Dam.  

SciTech Connect (OSTI)

In addition to being renewable, hydropower has the advantage of allowing rapid load-following, in that the generation rate can easily be varied within a day to match the demand for power. However, the flow fluctuations that result from load-following can be controversial, in part because they may affect downstream fish populations. At Flaming Gorge Dam, located on the Green River in northeastern Utah, concern has been raised about whether flow fluctuations caused by the dam disrupt feeding at a tailwater trout fishery, as fish move in response to flow changes and as the flow changes alter the amount or timing of the invertebrate drift that trout feed on. Western Area Power Administration (Western), which controls power production on submonthly time scales, has made several operational changes to address concerns about flow fluctuation effects on fisheries. These changes include reducing the number of daily flow peaks from two to one and operating within a restricted range of flows. These changes significantly reduce the value of the power produced at Flaming Gorge Dam and put higher load-following pressure on other power plants. Consequently, Western has great interest in understanding what benefits these restrictions provide to the fishery and whether adjusting the restrictions could provide a better tradeoff between power and non-power concerns. Directly evaluating the effects of flow fluctuations on fish populations is unfortunately difficult. Effects are expected to be relatively small, so tightly controlled experiments with large sample sizes and long study durations would be needed to evaluate them. Such experiments would be extremely expensive and would be subject to the confounding effects of uncontrollable variations in factors such as runoff and weather. Computer simulation using individual-based models (IBMs) is an alternative study approach for ecological problems that are not amenable to analysis using field studies alone. An IBM simulates how a population responds to environmental changes by representing how the population's individuals interact with their environment and each other. IBMs represent key characteristics of both individual organisms (trout, in this case) and the environment, thus allowing controlled simulation experiments to analyze the effects of changes in the key variables. For the flow fluctuation problem at Flaming Gorge Dam, the key environmental variables are flow rates and invertebrate drift concentrations, and the most important processes involve how trout adapt to changes (over space and time) in growth potential and mortality risk. This report documents simulation analyses of flow fluctuation effects on trout populations. The analyses were conducted in a highly controlled fashion: an IBM was used to predict production (survival and growth) of trout populations under a variety of scenarios that differ only in the level or type of flow fluctuation.

Railsback, S. F.; Hayse, J. W.; LaGory, K. E.; Environmental Science Division; EPRI

2006-01-01T23:59:59.000Z

458

Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008  

SciTech Connect (OSTI)

This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

2009-12-28T23:59:59.000Z

459

Korea's Newly Enacted Unified Bankruptcy Act: The Role of the New Act in Facilitating (or Discouraging) the Transfer of Corporate Control  

E-Print Network [OSTI]

perspective of corporate governance, the decision whether toefforts to implement corporate governance reforms and otherthe weakness of the corporate governance mechanism in Korea,

Ko, Haksoo

2007-01-01T23:59:59.000Z

460

--ibm corporate responsibility report--The IBM Corporate Responsibility Report represents the information reported in various categories on IBM's Corporate Responsibility Web site.  

E-Print Network [OSTI]

Thomas, Harvard Business School The Future of Work: an interview with Thomas Malone, MIT Sloan School Corporate Governance · Leadership · External Audits Management System · Objectives · Business Conduct Guidelines · Policies · Internal Audits · Personal Business Commitments Relationships · Business Partners

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

FINAL TECHNICAL REPORT AMERICAN RECOVERY AND REINVESTMENT ACT NORTH FORK SKOKOMISH POWERHOUSE AT CUSHMAN NO. 2 DAM  

SciTech Connect (OSTI)

The objective of this project was to add generating capacity on an in-stream flow release at Tacoma Power's Cushman hydroelectric project, Cushman No. 2 Dam, FERC Project P-460. The flow that is being used to generate additional electricity was being discharged from a valve at the base of the dam without recovery of the energy. A second objective to the project was to incorporate upstream fish passage by use of a fish collection structure attached to the draft tubes of the hydroelectric units. This will enable reintroduction of native anadromous fish above the dams which have blocked fish passage since the late 1920's. The project was funded in part by the American Recovery and Reinvestment Act through the Department of Energy, Office of Energy, Efficiency and Renewable Energy, Wind and Water Power Program.

Fischer, Steve; Wilson, Matthew

2013-09-30T23:59:59.000Z

462

Water Velocity Measurements on a Vertical Barrier Screen at the Bonneville Dam Second Powerhouse  

SciTech Connect (OSTI)

Fish screens at hydroelectric dams help to protect rearing and migrating fish by preventing them from passing through the turbines and directing them towards the bypass channels by providing a sweeping flow parallel to the screen. However, fish screens may actually be harmful to fish if they become impinged on the surface of the screen or become disoriented due to poor flow conditions near the screen. Recent modifications to the vertical barrier screens (VBS) at the Bonneville Dam second powerhouse (B2) intended to increase the guidance of juvenile salmonids into the juvenile bypass system (JBS) have resulted in high mortality and descaling rates of hatchery subyearling Chinook salmon during the 2008 juvenile salmonid passage season. To investigate the potential cause of the high mortality and descaling rates, an in situ water velocity measurement study was conducted using acoustic Doppler velocimeters (ADV) in the gatewell slot at Units 12A and 14A of B2. From the measurements collected the average approach velocity, sweep velocity, and the root mean square (RMS) value of the velocity fluctuations were calculated. The approach velocities measured across the face of the VBS varied but were mostly less than 0.3 m/s. The sweep velocities also showed large variances across the face of the VBS with most measurements being less than 1.5 m/s. This study revealed that the approach velocities exceeded criteria recommended by NOAA Fisheries and Washington State Department of Fish and Wildlife intended to improve fish passage conditions.

Hughes, James S.; Deng, Zhiqun; Weiland, Mark A.; Martinez, Jayson J.; Yuan, Yong

2011-11-22T23:59:59.000Z

463

Prediction of Total Dissolved Gas (TDG) at Hydropower Dams throughout the Columbia  

SciTech Connect (OSTI)

The network of dams throughout the Columbia River Basin (CRB) are managed for irrigation, hydropower production, flood control, navigation, and fish passage that frequently result in both voluntary and involuntary spillway releases. The entrainment of air in spillway releases and the subsequent exchange of atmospheric gasses into solution during passage through the stilling basin cause elevated levels of total dissolved gas (TDG) saturation. Physical processes that affect TDG exchange at hydropower facilities have been characterized throughout the CRB in site-specific studies and at real-time water quality monitoring stations. These data have been used to develop predictive models of TDG exchange which are site specific and account for the fate of spillway and powerhouse flows in the tailrace channel and resultant transport and exchange in route to the downstream dam. Currently, there exists a need to summarize the findings from operational and structural TDG abatement programs conducted throughout the CRB and for the development of a generalized prediction model that pools data collected at multiple projects with similar structural attributes. A generalized TDG exchange model can be tuned to specific projects and coupled with water regulation models to allow for the formulation of optimal water regulation schedules subject to water quality constraints for TDG supersaturation. It is proposed to develop a methodology for predicting TDG levels downstream of hydropower facilities with similar structural properties as a function of a set of variables that affect TDG exchange; such as tailwater depth, spill discharge and pattern, project head, and entrainment of powerhouse releases.

Pasha, MD Fayzul K [ORNL] [ORNL; Hadjerioua, Boualem [ORNL] [ORNL; Stewart, Kevin M [ORNL] [ORNL; Bender, Merlynn [Bureau of Reclamation] [Bureau of Reclamation; Schneider, Michael L. [U.S. Army Corps of Engineers] [U.S. Army Corps of Engineers

2012-01-01T23:59:59.000Z

464

White Sturgeon Mitgation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2003-2004 Annual Report.  

SciTech Connect (OSTI)

We report on our progress from April 2003 through March 2004 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

Rein, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

2005-08-01T23:59:59.000Z

465

White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam; 2004-2005 Annual Report.  

SciTech Connect (OSTI)

We report on our progress from April 2004 through March 2005 on determining the effects of mitigative measures on productivity of white sturgeon populations in the Columbia River downstream from McNary Dam, and on determining the status and habitat requirements of white sturgeon populations in the Columbia and Snake rivers upstream from McNary Dam. This is a multi-year study with many objectives requiring more than one year to complete; therefore, findings from a given year may be part of more significant findings yet to be reported.

Rien, Thomas A.; Hughes, Michele L.; Kern, J. Chris (Oregon Department of Fish and Wildlife, Clackamas, OR)

2006-03-01T23:59:59.000Z

466

The Implications of Dam Deconstruction Methods on the Downstream Channel Bed Kristen M. Cannatelli (kmc7r@virginia.edu) and Joanna Crowe Curran (curran@virginia.edu)  

E-Print Network [OSTI]

The Implications of Dam Deconstruction Methods on the Downstream Channel Bed Kristen M. Cannatelli it downstream. At the same time, the lack of sediment supply downstream leads to channel and bank erosion of dam removal sequencing on sediment transport rates and downstream channel bathymetry. Vertical, Staged

Curran, Joanna C.

467

Under very extreme conditions a flood that threatens to overtop a dam may be combined with strong winds that generate waves in the reservoir.  

E-Print Network [OSTI]

Under very extreme conditions a flood that threatens to overtop a dam may be combined with strong winds that generate waves in the reservoir. Prolonged wave overtopping or a combination of wave the actions of wind generated waves and wave overtopping. The uneven elevations of the dam crest

Bowles, David S.

468

Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.  

SciTech Connect (OSTI)

Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to 'protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to restore the fisheries and fish habitat in basin streams and lakes. 'Mitigation for the Construction and Operation of Libby Dam' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan.

Dunnigan, James; DeShazer, J.; Garrow, L.

2009-05-26T23:59:59.000Z

469

Hydroacoustic Evaluation of Juvenile Salmonid Passage and Distribution at Detroit Dam, 2011  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory evaluated juvenile salmonid passage and distribution at Detroit Dam (DET) on the North Santiam River, Oregon for the U.S. Army Corps of Engineers (USACE) to provide data to support decisions on long-term measures to enhance downstream passage at DET and others dams in USACE’s Willamette Valley Project. This study was conducted in response to regulatory requirements necessitated by the listing of Upper Willamette River Spring Chinook salmon (Oncorhynchus tshawytscha) and Upper Willamette River steelhead (O. mykiss) as threatened under the Endangered Species Act. The goal of the study was to provide information of juvenile salmonid passage and distribution at DET from February 2011 through February 2012. The results of the hydroacoustic study provide new and, in some cases, first-ever data on passage estimates, run timing, distributions, and relationships between fish passage and environmental variables at the dam. This information will inform management decisions on the design and development of surface passage and collection devices to help restore Chinook salmon populations in the North Santiam River watershed above DET. During the entire study period, an estimated total of 182,526 smolt-size fish (±4,660 fish, 95% CI) passed through turbine penstock intakes. Run timing peaked in winter and early spring months. Passage rates were highest during late fall, winter and early spring months and low during summer. Horizontal distribution for hours when both turbine units were operated simultaneously indicated Unit 2 passed almost twice as much fish as Unit 1. Diel distribution for smolt-size fish during the study period was fairly uniform, indicating fish were passing the turbines at all times of the day. A total of 5,083 smolt-size fish (± 312 fish, 95% CI) were estimated passed via the spillway when it was open between June 23 and September 27, 2011. Daily passage was low at the spillway during the June-August period, and increased somewhat in September 2011. When the spillway was operated simultaneously with the turbines, spillway efficiency (efficiency is estimated as spillway passage divided by total project passage) was 0.72 and effectiveness (fish:flow ratio—proportion fish passage at a route (e.g., spillway) divided by proportion water through that route out of the total project) was 2.69. That is, when the spillway was open, 72% of the fish passing the dam used the spillway and 28% passed into the turbine penstocks. Diel distribution for smolt-size fish at the spillway shows a distinct peak in passage between mid-morning and mid-afternoon and low passage at night. We estimated that 23,339 smolt-size fish (± 572 fish, 95% CI) passed via the Regulating Outlet (RO) when it was open from October 29 through November 12, 2011, January 2-6, and January 20 through February 3, 2012. During the October–November period, RO passage peaked at 1,086 fish on November 5, with a second peak on November 7 (1,075 fish). When the RO was operated simultaneously with the turbines, RO efficiency was 0.33 and effectiveness was 0.89. In multiple regression analyses, a relatively parsimonious model was selected that predicted the observed fish passage data well. The best model included forebay temperature at depth, forebay elevation, total discharge, hours of daylight, and the operation period. The vertical distribution of fish in the forebay near the face of the dam where the transducers sampled showed fish were generally distributed throughout the water column during all four operational periods. During the refill and full pool periods, vertical distribution was bi-modal with surface-layer and mid-water modes. Patterns for day and night distributions were variable. Fish were distributed above and below the thermocline when it was present (full pool and drawdown periods).

Khan, Fenton; Royer, Ida M.; Johnson, Gary E.; Ham, Kenneth D.

2012-11-15T23:59:59.000Z

470

Recovery Act: Waste Energy Project at AK Steel Corporation Middletown  

SciTech Connect (OSTI)

In 2008, Air Products and Chemicals, Inc. (“Air Products”) began development of a project to beneficially utilize waste blast furnace “topgas” generated in the course of the iron-making process at AK Steel Corporation’s Middletown, Ohio works. In early 2010, Air Products was awarded DOE Assistance Agreement DE-EE002736 to further develop and build the combined-cycle power generation facility. In June 2012, Air Products and AK Steel Corporation terminated work when it was determined that the project would not be economically viable at that time nor in the foreseeable future. The project would have achieved the FOA-0000044 Statement of Project Objectives by demonstrating, at a commercial scale, the technology to capture, treat, and convert blast furnace topgas into electric power and thermal energy.

Joyce, Jeffrey

2012-06-30T23:59:59.000Z

471

Development of the SEA Corporation Powergrid{trademark} photovoltaic concentrator  

SciTech Connect (OSTI)

This report covers the three phase effort to bring the SEA Corporation`s Powergrid{trademark} from the concept stage to pilot production. The three phases of this contract covered component development, prototype module development, and pilot line production. The Powergrid is a photovoltaic concentrator that generates direct current electricity directly from sunlight using a linear Fresnel lens. Analysis has shown that the Powergrid has the potential to be very low cost in volume production. Before the start of the project, only proof of concept demonstrations of the components had been completed. During the project, SEA Corporation developed a low cost extruded Fresnel lens, a low cost receiver assembly using one sun type cells, a low cost plastic module housing, a single axis tracking system and frame structure, and pilot production equipment and techniques. In addition, an 800 kW/yr pilot production rate was demonstrated and two 40 kW systems were manufactured and installed.

Kaminar, N.; Curchod, D.; Daroczi, S.; Walpert, M.; Sahagian, J.; Pepper, J. [Photovoltaics International, LLC, Sunnyvale, CA (United States)

1998-03-01T23:59:59.000Z

472

Factors Affecting Route Selection and Survival of Steelhead Kelts at Snake River Dams in 2012 and 2013  

SciTech Connect (OSTI)

In 2012 and 2013, Pacific Northwest National Laboratory conducted a study that summarized the passage proportions and route-specific survival rates of steelhead kelts that passed through Federal Columbia River Power System (FCRPS) dams. To accomplish this, a total of 811 steelhead kelts were tagged with Juvenile Salmon Acoustic Telemetry System (JSATS) transmitters. Acoustic receivers, both autonomous and cabled, were deployed throughout the FCRPS to monitor the downstream movements of tagged-kelts. Kelts were also tagged with Passive Integrated Transponder tags to monitor passage through juvenile bypass systems and detect returning fish. The current study evaluated data collected in 2012 and 2013 to identify individual, behavioral, environmental and dam operation variables that were related to passage and survival of steelhead kelts that passed through FCRPS dams. Bayesian model averaging of multivariable logistic regression models was used to identify the environmental, temporal, operational, individual, and behavioral variables that had the highest probability of influencing the route of passage and the route-specific survival probabilities for kelts that passed Lower Granite (LGR), Little Goose (LGS), and Lower Monumental (LMN) dams in 2012 and 2013. The posterior probabilities of the best models for predicting route of passage ranged from 0.106 for traditional spill at LMN to 0.720 for turbine passage at LGS. Generally, the behavior (depth and near-dam searching activity) of kelts in the forebay appeared to have the greatest influence on their route of passage. Shallower-migrating kelts had a higher probability of passing via the weir and deeper-migrating kelts had a higher probability of passing via the JBS and turbines than other routes. Kelts that displayed a higher level of near-dam searching activity had a higher probability of passing via the spillway weir and those that did less near-dam searching had a higher probability of passing via the JBS and turbines. The side of the river in which kelts approached the dam and dam operations also affected route of passage. Dam operations and the size and condition of kelts were found to have the greatest effect on route-specific survival probabilities for fish that passed via the spillway at LGS. That is, longer kelts and those in fair condition had a lower probability of survival for fish that passed via the spillway weir. The survival of spillway weir- and deep-spill passed kelts was positively correlated with the percent of the total discharge that passed through turbine unit 4. Too few kelts passed through the traditional spill, JBS, and turbine units to evaluate survival through these routes. The information gathered in this study describes Snake River steelhead kelt passage behavior, rates, and distributions through the FCRPS as well as provide information to biologists and engineers about the dam operations and abiotic conditions that are related to passage and survival of steelhead kelts.

Harnish, Ryan A.; Colotelo, Alison HA; Li, Xinya; Ham, Kenneth D.; Deng, Zhiqun

2014-12-15T23:59:59.000Z

473

A corporate fitness center : an example for the reuse of the Empire Stores, Brooklyn, N.Y.  

E-Print Network [OSTI]

The proliferation of over 500 fitness programs for the employees of American corporations marks a turning point for the way American corporations regard employee and corporate health. Typically, sports facilities were the ...

Georgopulos, Diane Theodora

1982-01-01T23:59:59.000Z

474

Accounting procedures under the Texas Business Corporation Act  

E-Print Network [OSTI]

Cuesion 0 ~ ~ ~ ~ ~ 0 ~ 0 4 8 8 ~ 8 I, Accounting for Stook Sulsoriptions and Issue of Capital Stook . . . ~ ~ & l XX y Surplus Qsl DivM and a s ~ e s a ~ ~ e ~ ~ i7 XIII' Trasaurg Stoa& ~ ~ o ~ s s e ~ ~ ~ ~ ~ a 52 XV. Dissolution of a Corporation... of the corporation with- out par value that, have been issued except such part of the consideration actually received therefor as msy have been allocated to capital surplus in a mannex' presented by law and any other amounts that have been txanskerred to stated...

Dodson, Donald R

1961-01-01T23:59:59.000Z

475

Figure 1. The wet area is flooded by damming up a small stream adjacent to the study area once a year for a period of 2-3 months. By  

E-Print Network [OSTI]

Figure 1. The wet area is flooded by damming up a small stream adjacent to the study area once. Figure 1.g The wet area is flooded by damming up a small streamded by damming up a smded by damwet area Vegetation data are obtained from two ri- parian grassland sites with strong hydro- logical gradients

Schierup, Mikkel Heide

476

An exploration of corporate entrepreneurship : venturing signatures and their underlying dynamics  

E-Print Network [OSTI]

The primary goal of this work is to broadly explore the factors influencing corporate entrepreneurship and to examine how its many elements can be linked together. A broad reading of the published literature on corporate ...

Furst, Michael R

2005-01-01T23:59:59.000Z

477

NCCR Trade Regulation Brown Bag Series Dr Franziska Humbert, Policy Advisor Corporate Social Responsibility, Oxfam Germany  

E-Print Network [OSTI]

Social Responsibility, Oxfam Germany International Constitutionalism and Child Labour Wednesday, 23, Policy Advisor Corporate Social Responsibility, Oxfam Germany. Abstract The postdoctoral thesis builds of the Speaker Franziska Humbert is a policy advisor on corporate social responsibility at Oxfam Germany

Richner, Heinz

478

E-business and organizational partnerships in Corporate Real Estate: a case study  

E-Print Network [OSTI]

E-business is transforming the business landscape and changing the roles and methods of Corporate Real Estate. In a Corporate Real Estate department in a large firm, a new and innovative strategy is used to manage their facilities - organizational...

Xia, Ge

2012-06-07T23:59:59.000Z

479

Corporate bankruptcy : assessment, analysis and prediction of financial distress, insolvency, and failure  

E-Print Network [OSTI]

This paper is divided into three sections that address the various elements of understanding, predicting and analyzing corporate failure and bankruptcy. Part I covers the definitions of corporate failure, explains the ...

Danilov, Konstantin A

2014-01-01T23:59:59.000Z

480

State Participation and the Corporate Value of Natural Resource Economic Rents   

E-Print Network [OSTI]

The asset participation relationship between the state and the corporate entity is an essential determinant of corporate value in the natural resource sector. Natural resources deplete, with the result that oil reserve ...

Kretzschmar, Gavin Lee

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "olympic dam corporation" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Bear Head LNG Corporation and Bear Head LNG (USA), LLC - FE Dkt...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Bear Head LNG Corporation and Bear Head LNG (USA), LLC - FE Dkt. No. - 15-33-LNG Bear Head LNG Corporation and Bear Head LNG (USA), LLC - FE Dkt. No. - 15-33-LNG The Office of...

482

Changing gear : driving corporate real estate financing decisions for the agile workplace  

E-Print Network [OSTI]

Given the needs of corporations in the global business environment, corporate real estate investment decisions represent strategic choices that support a company's overall business strategy. This thesis clearly illustrates ...

Hardy, Trevor J. F. (Trevor John Fraser), 1977-

2002-01-01T23:59:59.000Z

483

What are matching gifts? Many corporations match their employees' charitable contributions. Your support for The  

E-Print Network [OSTI]

Mobil FAMM LLC Firestone/Bridgestone Tire First Data Corporation FMC Foundation Freeport McMoran, Inc Co. Georgia Gulf Corporation Goodyear Corp. Graybar Electric Co. Great Lakes Carbon Corp. Grinnell

Azevedo, Ricardo

484

Olympic Volunteer Centre Emergency Instructions  

E-Print Network [OSTI]

, or do not know the location of the shooter, hide in a locked or barricaded room and turn out the lights the emergency call Campus Security at 403-220-5333 from a safe location Hazardous Materials Spill Only attempt

de Leon, Alex R.

485

Review: Business and Environmental Policy: Corporate Interests in the American Political System, by Michael E. Kraft and Sheldon Kamieniecki (eds.)  

E-Print Network [OSTI]

Business and Environmental Policy: Corporate Interests ineds). Business and Environmental Policy: Corporate Interestsalso holds in the environmental policy-making realm and many

Meij, Jan-Martin

2008-01-01T23:59:59.000Z

486

Exploring the Potential Impact of Reforestation on the Hydrology of the Upper Tana River Catchment and the Masinga Dam, Kenya  

E-Print Network [OSTI]

Catchment and the Masinga Dam, Kenya Jennifer Jacobs, Jay Angerer, Jeff Vitale Raghavan Srinivasan, Robert of the most critical resource areas of Kenya. The Masinga Reservoir, at the outlet of the basin, provides, collaborating technical policy analysts working for key government institutions in Kenya identified the need

487

Comment submitted by BSH Home Appliances Corporation regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by BSH Home Appliances Corporation regarding the Energy Star Verification Testing Program

488

Comment submitted by CertainTeed Corporation regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by CertainTeed Corporation regarding the Energy Star Verification Testing Program

489

Comment submitted by A. O. Smith Corporation regarding the Energy Star Verification Testing Program  

Broader source: Energy.gov [DOE]

This document is a comment submitted by A. O. Smith Corporation regarding the Energy Star Verification Testing Program

490

Survival Estimates for the Passage of Spring-Migrating Juvenile Salmonids through Snake and Columbia River Dams and Reservoirs, 2008.  

SciTech Connect (OSTI)

In 2008, the National Marine Fisheries Service completed the sixteenth year of a study to estimate survival and travel time of juvenile salmonids Oncorhynchus spp. passing through dams and reservoirs on the Snake and Columbia Rivers. All estimates were derived from detections of fish tagged with passive integrated transponder (PIT) tags. We PIT tagged and released a total of 18,565 hatchery steelhead O. mykiss, 15,991 wild steelhead, and 9,714 wild yearling Chinook salmon O. tshawytscha at Lower Granite Dam in the Snake River. In addition, we utilized fish PIT tagged by other agencies at traps and hatcheries upstream from the hydropower system and at sites within the hydropower system in both the Snake and Columbia Rivers. These included 122,061 yearling Chinook salmon tagged at Lower Granite Dam for evaluation of latent mortality related to passage through Snake River dams. PIT-tagged smolts were detected at interrogation facilities at Lower Granite, Little Goose, Lower Monumental, Ice Harbor, McNary, John Day, and Bonneville Dams and in the PIT-tag detector trawl operated in the Columbia River estuary. Survival estimates were calculated using a statistical model for tag-recapture data from single release groups (the single-release model). Primary research objectives in 2008 were to: (1) estimate reach survival and travel time in the Snake and Columbia Rivers throughout the migration period of yearling Chinook salmon and steelhead, (2) evaluate relationships between survival estimates and migration conditions, and (3) evaluate the survival estimation models under prevailing conditions. This report provides reach survival and travel time estimates for 2008 for PIT-tagged yearling Chinook salmon (hatchery and wild), hatchery sockeye salmon O. nerka, hatchery coho salmon O. kisutch, and steelhead (hatchery and wild) in the Snake and Columbia Rivers. Additional details on the methodology and statistical models used are provided in previous reports cited here. Survival and detection probabilities were estimated precisely for most of the 2008 yearling Chinook salmon and steelhead migrations. Hatchery and wild fish were combined in some of the analyses. For yearling Chinook salmon, overall percentages for combined release groups used in survival analyses in the Snake River were 80% hatchery-reared and 20% wild. For steelhead, the overall percentages were 65% hatchery-reared and 35% wild. Estimated survival from the tailrace of Lower Granite Dam to the tailrace of Little Goose Dam averaged 0.939 for yearling Chinook salmon and 0.935 for steelhead.

Faulkner, James R.; Smith, Steven G.; Muir, William D. [Northwest Fisheries Science Center

2009-06-23T23:59:59.000Z

491

The Earth Institute I Corporate Circle The latest information, tools and networks to achieve sustainability  

E-Print Network [OSTI]

The Earth Institute I Corporate Circle Fall 2009 The latest information, tools and networks to achieve sustainability #12;The Earth Institute I Corporate Circle STRATEGIC OPPORTUNITIES GOAL Engage and allow for flexibility in the nature and extent of engagement. The Earth Institute I Corporate Circle #12

492

Do corporate political strategies differ from one country to The case of France and Britain  

E-Print Network [OSTI]

Do corporate political strategies differ from one country to the next ? The case of France in particular to determine if corporate political actions differ from one country to the next. To answer. Then, variance analysis is used to modelize corporate political strategies in both countries. Keywords

Boyer, Edmond

493

TECHNICAL REPORT SCR-01-TR-703 c Siemens Corporate Research 2001  

E-Print Network [OSTI]

TECHNICAL REPORT SCR-01-TR-703 c Siemens Corporate Research 2001 A Spectral Power Factorization Radu Balan and Justinian Rosca radu.balan,justinian.rosca@scr.siemens.com Siemens Corporate Research) #12;c Siemens Corporate Research 2001 2 and therefore the sum has the spectral power: Rx(z) = G2 1 P1

Maryland at College Park, University of

494

2012 Eaton Corporation. All rights reserved. This is a photographic template your  

E-Print Network [OSTI]

© 2012 Eaton Corporation. All rights reserved. This is a photographic template ­ your photograph (dominiquelallement@eaton.com) #12;2© 2012 Eaton Corporation. All rights reserved. Green Days January 2012 Power Management in virtual server environment Agenda · Eaton Corporation · Power Management Software suite · Power

Lefèvre, Laurent

495

An Assessment of Energy Potential at Non-Powered Dams in the United States  

SciTech Connect (OSTI)

fleet by 15%. A majority of this potential is concentrated in just 100 NPDs, which could contribute approximately 8 GW of clean, reliable hydropower; the top 10 facilities alone could add up to 3 GW of new hydropower. Eighty-one of the 100 top NPDs are U.S. Army Corps of Engineers (USACE) facilities, many of which, including all of the top 10, are navigation locks on the Ohio River, Mississippi River, Alabama River, and Arkansas River, as well as their major tributaries. This study also shows that dams owned by the U.S. Bureau of Reclamation hold the potential to add approximately 260 MW of capacity; the Bureau has also engaged in an effort to conduct a more detailed evaluation of its own facilities.

Hadjerioua, Boualem [ORNL; Wei, Yaxing [ORNL; Kao, Shih-Chieh [ORNL

2012-04-01T23:59:59.000Z

496

Synthesis of Biological Reports on Juvenile Fish Passage and Survival at Bonneville Dam through 2005  

SciTech Connect (OSTI)

This report describes a review of available literature on juvenile salmonid passage at Bonneville Dam from 1939 through 2005. Studies of interest included project-wide fish-passage efficiency (FPE) studies by radio telemetry and fixed-aspect hydroacoustics, fish survival studies (direct and indirect), FGE studies, powerhouse and unit (by netting, hydroacoustics, and radio telemetry), predation studies in the forebay and tailrace, behavioral studies on forebay approach and egress, and surface-bypass studies. The FPE effort will include a review of available distribution data (horizontal, diel, and vertical) for juvenile salmon. This study does not repeat the results of previous review and synthesis studies but cites them. Where no previous review exists for a subject area, all reports were reviewed and synthesized. The report includes an annotated bibliography summarizing each of the documents reviewed and a DVD disk containing all of the original papers and reports along with an HTML index to the documents.

Ploskey, Gene R.; Johnson, Gary E.; Giorgi, Albert E.; Johnson, Richard L.; Stevenson, John R.; Schilt, Carl R.; Johnson, Peter N.; Patterson, Deborah S.

2005-06-01T23:59:59.000Z

497

Evaluation of Fish Passage Conditions for Juvenile Salmonids Using Sensor Fish at Detroit Dam, Oregon  

SciTech Connect (OSTI)

Fish passage conditions through two spillways at Detroit Dam on the North Santiam River in Oregon were evaluated by Pacific Northwest National Laboratory for the U.S. Army Corps of Engineers (USACE), Portland District, using Sensor Fish devices. The objective of the study was to describe and compare passage exposure conditions through Spillbay 3 and Spillbay 6 at 1.5- and 3.5-ft gate openings, identifying potential fish injury regions of the routes. The study was performed in July 2009, concurrent with HI-Z balloon-tag studies by Normandeau Associates, Inc. Sensor Fish and live fish were deployed at elevations approximately 3 ft above structure at depths determined using a computational fluid dynamics model. Data collected were analyzed to estimate 1) exposure conditions, particularly exposure to severe collision and shear events by passage route sub-regions; 2) differences in passage conditions between passage routes; and 3) relationships to live-fish injury and mortality data estimates.

Duncan, Joanne P.

2010-01-29T23:59:59.000Z

498

Hydroacoustic Evaluation of Juvenile Salmonid Passage and Distribution at Lookout Point Dam, 2010  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory evaluated juvenile salmonid passage and distribution at Lookout Point Dam (LOP) on the Middle Fork Willamette River for the U.S. Army Corps of Engineers, Portland District (USACE), to provide data to support decisions on long-term measures to enhance downstream passage at LOP and others dams in USACE's Willamette Valley Project. This study was conducted in response to the listing of Upper Willamette River Spring Chinook salmon (Oncorhynchus tshawytscha) and Upper Willamette River steelhead (O. mykiss) as threatened under the Endangered Species Act. We conducted a hydroacoustic evaluation of juvenile salmonid passage and distribution at LOP during February 2010 through January 2011. Findings from this 1 year of study should be applied carefully because annual variation can be expected due to variability in adult salmon escapement, egg-to-fry and fry-to-smolt survival rates, reservoir rearing and predation, dam operations, and weather. Fish passage rates for smolt-size fish (> {approx}90 mm and < 300 mm) were highest during December-January and lowest in mid-summer through early fall. Passage peaks were also evident in early spring, early summer, and late fall. During the entire study period, an estimated total of 142,463 fish {+-} 4,444 (95% confidence interval) smolt-size fish passed through turbine penstock intakes. Of this total, 84% passed during December-January. Run timing for small-size fish ({approx}65-90 mm) peaked (702 fish) on December 18. Diel periodicity of smolt-size fish showing crepuscular peaks was evident in fish passage into turbine penstock intakes. Relatively few fish passed into the Regulating Outlets (ROs) when they were open in summer (2 fish/d) and winter (8 fish/d). Overall, when the ROs were open, RO efficiency (RO passage divided by total project passage) was 0.004. In linear regression analyses, daily fish passage (turbines and ROs combined) for smolt-size fish was significantly related to project discharge (P<0.001). This relationship was positive, but there was no relationship between total project passage and forebay elevation (P=0.48) or forebay elevation delta, i.e., day-to-day change in forebay elevation (P=0.16). In multiple regression analyses, a relatively parsimonious model was selected that predicted the observed data well. The multiple regression model indicates a positive trend between expected daily fish passage and each of the three variables in the model-Julian day, log(discharge), and log(abs(forebay delta)); i.e., as any of the environmental variables increase, expected daily fish passage increases. For vertical distribution of fish at the face of the dam, fish were surface-oriented with 62%-80% occurring above 10 m deep. The highest percentage of fish (30%-60%) was found between 5-10-m-deep. During spring and summer, mean target strengths for the analysis periods ranged from -44.2 to -42.1 dB. These values are indicative of yearling-sized juvenile salmon. In contrast, mean target strengths in fall and winter were about -49.0 dB, which are representative of subyearling-sized fish. The high-resolution spatial and temporal data reported herein provide detailed information about vertical, horizontal, diel, daily, and seasonal fish passage rates and distributions at LOP from March 2010 through January 2011. This information will support management decisions on design and development of surface passage and collection devices to help restore Chinook salmon populations in the Middle Fork Willamette River watershed above LOP.

Khan, Fenton; Johnson, Gary E.; Royer, Ida M.; Hughes, James S.; Fischer, Eric S.; Trott, Donna M.; Ploskey, Gene R.

2012-05-31T23:59:59.000Z

499

Philadelphia Electric Company's East Fish Passage Facility at the Conowingo Dam  

SciTech Connect (OSTI)

The Conowingo East Fish Passage Facility employs the latest technology to attract, collect, and pass American Shad upstream of the dam as they make their annual spring spawning run u the Susquehanna River. The facility is designed to move up to 750,000 American Shad and 5 million River Herring per season, i.e., April 1 through June 15. The facility is designed so that if the numbers of American Shad warrant, the capacity of the flit may be doubled in the future. This paper will discuss the key elements in the design of a fishway, including planning, engineering, and hydraulic modelling. The paper will also address installation and operational experience at Philadelphia Electric's new East Side Fish Passage Facility.

Brunot, J.T. (Philadelphia Electric Co., Philadelphia, PA (US)); Frese, C.R. (RMC Environmental Services, Muddy Run Ecological Lab., Drumore, PA (US))

1992-01-01T23:59:59.000Z

500

Use of an autonomous sensor to evaluate the biological performance of the advanced turbine at Wanapum Dam  

DOE Public Access Gateway for Energy & Science Beta (PAGES Beta)

Hydropower is the largest renewable energy resource in the United States and the world. However, hydropower dams have adverse ecological impacts because migrating fish may be injured or killed when they pass through hydroturbines. In the Columbia and Snake River basins, dam operators and engineers are required to make those hydroelectric facilities more fish-friendly through changes in hydroturbine design and operation after fish population declines and the subsequent listing of several species of Pacific salmon under the Endangered Species Act of 1973. Public Utility District No. 2 of Grant County, Washington, requested authorization from the Federal Energy Regulatory Commission to replace the ten turbines at Wanapum Dam with advanced hydropower turbines designed to improve survival for fish passing through the turbines while improving operation efficiency and increasing power generation. As an additional measure to the primary metric of direct injury and mortality rates of juvenile Chinook salmon using balloon tag-recapture methodology, this study used an autonomous sensor device - the Sensor Fish - to provide insight into the specific hydraulic conditions and physical stresses experienced by the fish as well as the specific causes of fish biological response. We found that the new hydroturbine blade shape and the corresponding reduction of turbulence in the advanced hydropower turbine were effective in meeting the objectives of improving fish survival while enhancing operational efficiency of the dam. The frequency of severe events based on Sensor Fish pressure and acceleration measurements showed trends similar to those of fish survival determined by the balloon tag-recapture methodology. In addition, the new turbine provided a better pressure and rate of pressure change environment for fish passage. Overall, the Sensor Fish data indicated that the advanced hydroturbine design improved passage of juvenile salmon at Wanapum Dam.

Deng, Zhiqun; Carlson, Thomas J.; Duncan, Joanne P.; Richmond, Marshall C.; Dauble, Dennis D.

2010-10-13T23:59:59.000Z