1

Savannah River Site  

NLE Websites -- All DOE Office Websites (Extended Search)

River Site Savannah River Site Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable management of...

2

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Operations Savannah River Operations Office Categorical Exclusion Determinations: Savannah River Operations Office Categorical Exclusion Determinations issued by Savannah River Operations Office. DOCUMENTS AVAILABLE FOR DOWNLOAD September 10, 2013 CX-010669: Categorical Exclusion Determination 484-17D Coal Yard Remediation CX(s) Applied: B6.1 Date: 06/07/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010837: Categorical Exclusion Determination Disassembly, Relocation, and Reassembly of a Metal-framed Quonset Hut CX(s) Applied: B1.22 Date: 08/01/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 1, 2013 CX-010836: Categorical Exclusion Determination Subcontractor Roof Repair at 717-12S CX(s) Applied: B1.3

3

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 27, 2012 June 27, 2012 CX-008614: Categorical Exclusion Determination Repair Culvert on Road 3 CX(s) Applied: B1.3 Date: 06/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 27, 2012 CX-008613: Categorical Exclusion Determination Replace Awning, Building 735-A CX(s) Applied: B1.3 Date: 06/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 26, 2012 CX-008618: Categorical Exclusion Determination Evaluation of Sorbent/Ion Exchangers for Radiochemical and Metal Separations CX(s) Applied: B3.6 Date: 06/26/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office June 26, 2012 CX-008617: Categorical Exclusion Determination Savannah River National Laboratory Building 735-13A Power Addition CX(s) Applied: B1.15

4

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 20, 2012 July 20, 2012 CX-009070: Categorical Exclusion Determination A-Area Alternate Fire Water Supply CX(s) Applied: B1.3 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 20, 2012 CX-009069: Categorical Exclusion Determination Remove and Dispose of 107 A & B Tanks and Support Structure CX(s) Applied: B6.1 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 20, 2012 CX-009068: Categorical Exclusion Determination Hydrogen Charging Tritium Contaminated Metals CX(s) Applied: B3.6 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 16, 2012 CX-009077: Categorical Exclusion Determination F-Area Infrasturcture Improvement CX(s) Applied: B1.23 Date: 07/16/2012

5

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 30, 2012 August 30, 2012 CX-009100: Categorical Exclusion Determination Cooling Tower Water Sampling and Analysis for Legionella Pneumophila Density CX(s) Applied: B3.6 Date: 08/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 29, 2012 CX-009106: Categorical Exclusion Determination Dismantle/Remove Vacuum System and Related Equipment in 772-F CX(s) Applied: B1.3 Date: 08/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 29, 2012 CX-009105: Categorical Exclusion Determination 284-H Track Coal Hopper Pit Modifications CX(s) Applied: B1.28 Date: 08/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office August 29, 2012 CX-009104: Categorical Exclusion Determination Infrastructure Modification for the Mobile Plutonium Facility (MPF) at the

6

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 CX-008639: Categorical Exclusion Determination Establish Laydown Yard East of 281-3F CX(s) Applied: B1.15 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008638: Categorical Exclusion Determination Excavate to Repair Underground Domestic Water Leak between Tanks 5 and 7 CX(s) Applied: B1.3 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008637: Categorical Exclusion Determination Operation and Maintenance of Inductively Coupled Plasma Mass Spectrometry Method in 773, B142 CX(s) Applied: B3.6 Date: 05/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office May 29, 2012 CX-008636: Categorical Exclusion Determination Analysis of Organic Species by Gas Chromatography (GC) and Gas

7

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 20, 2013 June 20, 2013 CX-010655: Categorical Exclusion Determination Roof Repair on Crane Maintenance Area Roof CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 18, 2013 CX-010657: Categorical Exclusion Determination Western Sector Treatment System Soil Vapor Extraction Wells CX(s) Applied: B3.1 Date: 06/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 18, 2013 CX-010656: Categorical Exclusion Determination Stormwater Drainage Repair CX(s) Applied: B1.3 Date: 06/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office June 17, 2013 CX-010662: Categorical Exclusion Determination Reroute Diesel Water Cooling Line at 241-125H CX(s) Applied: B1.3 Date: 06/17/2013

8

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 21, 2013 May 21, 2013 CX-010489: Categorical Exclusion Determination Salt Batch 7 Qualification CX(s) Applied: B3.6 Date: 05/21/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010497: Categorical Exclusion Determination Electrical Operations to Perform Yard Maintenance in Electrical Substations CX(s) Applied: B1.3 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010496: Categorical Exclusion Determination Corrosion Tests on Carbon Steel Exposed to Oxalic Acid and a Sludge Simulant CX(s) Applied: B3.6 Date: 05/14/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office May 14, 2013 CX-010495: Categorical Exclusion Determination Advanced Fuel Cycle Initiative (AFCI) Am/Cm Separations

9

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 17, 2012 January 17, 2012 CX-007642: Categorical Exclusion Determination Parking Lot Construction North of Pad 717-14F CX(s) Applied: B1.15 Date: 01/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office January 4, 2012 CX-007646: Categorical Exclusion Determination Insulation removal work in F-Tank Farm CX(s) Applied: B1.3 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office January 4, 2012 CX-007645: Categorical Exclusion Determination Nonproliferation Technology Section - Nanomaterials Research CX(s) Applied: B3.6 Date: 01/04/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office December 29, 2011 CX-007650: Categorical Exclusion Determination Control Room Consolidation CX(s) Applied: B2.2

10

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 1, 2012 November 1, 2012 CX-009620: Categorical Exclusion Determination Next Generation Solvent (NGS) Real Waste Testing CX(s) Applied: B3.6 Date: 11/01/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office October 31, 2012 CX-009624: Categorical Exclusion Determination High Activity Waste Trailer (HAWT) Disposition CX(s) Applied: B3.1 Date: 10/31/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office October 31, 2012 CX-009623: Categorical Exclusion Determination Technetium Precipitation Batch Testing CX(s) Applied: B3.6 Date: 10/31/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office October 25, 2012 CX-009625: Categorical Exclusion Determination Preparation and Temperature-Time Settling Treatment of Rheology Samples

11

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 29, 2012 November 29, 2012 CX-009607: Categorical Exclusion Determination 772-F Low-Activity Drain (LAD) Discharge Header Modification CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 29, 2012 CX-008651: Categorical Exclusion Determination Dismantle and Remove (D&R) and Replace 773-A D-Wing Air Handling and Condensing Units CX(s) Applied: B1.3 Date: 05/17/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 29, 2012 CX-009608: Categorical Exclusion Determination Refurbish 607-53C Sanitary Sewer Lift Station CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office November 27, 2012 CX-009611: Categorical Exclusion Determination

12

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 31, 2013 July 31, 2013 CX-010844: Categorical Exclusion Determination Subcontractor Repair of Leak Over Entry Door #1 at 703-B CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 30, 2013 CX-010846: Categorical Exclusion Determination Install Stud, Shims, and Nut in the L-Basin 70-Ton Cask Lid Support Structure CX(s) Applied: B2.5 Date: 07/30/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 23, 2013 CX-010850: Categorical Exclusion Determination Install Well Pump into the F-Tank Farm Catch Tank FL-241901-WTS-TK-1 CX(s) Applied: B1.3 Date: 07/23/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 23, 2013 CX-010849: Categorical Exclusion Determination

13

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 15, 2013 March 15, 2013 CX-010126: Categorical Exclusion Determination Operation of Induction Furnace Fabrication Lab CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010125: Categorical Exclusion Determination Microfluidics for Advanced Separation and Ultrasensitive Detection CX(s) Applied: B3.6 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010131: Categorical Exclusion Determination Replacement of the 254-13H Safety Significant (SS) Standby Diesel Generator CX(s) Applied: B1.25 Date: 03/15/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office March 15, 2013 CX-010130: Categorical Exclusion Determination Mechanical Isolation of Plant Air System at TNX

14

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 13, 2013 August 13, 2013 CX-011158: Categorical Exclusion Determination Subcontractor Repair of Roof Leaks at 717-11A CX(s) Applied: B1.3 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 13, 2013 CX-011157: Categorical Exclusion Determination Subcontractor Roof Repairs in Telecom Room at 702-C CX(s) Applied: B1.3 Date: 08/13/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2013 CX-011163: Categorical Exclusion Determination Subcontractor Repair of Roof Leaks at 730-4B CX(s) Applied: B1.3 Date: 08/08/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office August 8, 2013 CX-011162: Categorical Exclusion Determination Subcontractor Repair of Roof Leaks at 730-1B CX(s) Applied: B1.3

15

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 16, 2013 April 16, 2013 CX-010322: Categorical Exclusion Determination Research and Development Welding and Brazing Sample Preparation and Activities in Building 723-A CX(s) Applied: B3.6 Date: 04/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 16, 2013 CX-010321: Categorical Exclusion Determination Destructive Evaluation of Plutonium Storage Can Bundles CX(s) Applied: B3.6 Date: 04/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 16, 2013 CX-010320: Categorical Exclusion Determination Corrosion Testing in Aqueous Solutions CX(s) Applied: B3.6 Date: 04/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 15, 2013 CX-010324: Categorical Exclusion Determination 772-F Chase 174 Sprinkler Modification

16

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 24, 2012 July 24, 2012 CX-009067: Categorical Exclusion Determination Deactivation and Decommissioning of the D-Area Detritiation Cells and Relocation of Associated Handi-Houses CX(s) Applied: B1.23 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 24, 2012 CX-009066: Categorical Exclusion Determination Characterization of Downgradient Volatile Organic Compounds Plume and Installation of Monitoring Well CX(s) Applied: B3.1 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office July 24, 2012 CX-009065: Categorical Exclusion Determination Installation of Sentinel Wells ASB011B/011C for A-2 Air Stripper Shutdown CX(s) Applied: B3.1 Date: 07/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

17

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 7, 2012 February 7, 2012 CX-007967: Categorical Exclusion Determination Electrochemical Fluorination in Molten Fluoride Salts CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office February 7, 2012 CX-007966: Categorical Exclusion Determination Sampling of Legacy Material for Material, Control & Accountability (MC&A) Verification CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office February 7, 2012 CX-007965: Categorical Exclusion Determination Grout Formulation & Variability Testing CX(s) Applied: B3.6 Date: 02/07/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office February 6, 2012 CX-007971: Categorical Exclusion Determination

18

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 7, 2011 November 7, 2011 CX-007671: Categorical Exclusion Determination Heat Exchanger Removal and Disposition CX(s) Applied: B6.1 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2011 CX-007670: Categorical Exclusion Determination Maintenance Excavation of the B-07 Outfall Ditch CX(s) Applied: B1.3 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office November 7, 2011 CX-007669: Categorical Exclusion Determination Vegetative Response to Metal Exposure in a Growing Media CX(s) Applied: B3.6 Date: 11/07/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office October 27, 2011 CX-007672: Categorical Exclusion Determination Sampling of Nuclear Fuel Assembly CX(s) Applied: B3.6

19

Savannah River National Laboratory  

At a glance Remote Electrical Throw Device Engineers at the Savannah River National Laboratory ... sufficient manufacturing capacity, established dist ...

20

Savannah River Site - Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Reports Savannah River Site Review Reports 2013 Independent Oversight Review of the Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation, November 2013 Independent Oversight Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development, August 2013 Independent Oversight Review of the Employee Concerns Program at the Savannah River Operations Office, July 2013 Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project, January 2013 Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design, January 2013 Activity Reports 2013 Savannah River Site Waste Solidification Building Corrective Actions from the January 2013 Report on Construction Quality of Mechanical Systems Installation and Fire Protection Design, May 2013

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Savannah River National Laboratory  

located in every town and city have the potential to be used as environmental ... Savannah River Nuclear Solutions, LLC. SRNS is responsible for

22

Savannah River Remediation Procurement  

NLE Websites -- All DOE Office Websites (Extended Search)

and procedures, rules and regulations, terms and conditions and the orders and directives under which Savannah River Remediation LLC (SRR) develops, issues, administers and...

23

Savannah River Ecology Laboratory  

NLE Websites -- All DOE Office Websites

Field Sites SREL is supported largely by external funding. Major sources include DOE Environmental Management, Savannah River Nuclear Solutions, USGS, US Department of the...

24

Savannah River National Laboratory  

The coupling also provided excellent response to impact. ... used as a means of remote camera and equipment, ... Savannah River Nuclear Solutions, ...

25

Savannah River National Laboratory  

Savannah River Nuclear Solutions, LLC. SRNS is responsible for transferring its technologies to the private sector so that these technologies may have ...

26

about Savannah River National Laboratory  

S R N The Savannah River Site and the Savannah River National Laboratory are owned by the U.S. Department of Energy, and are managed and operated by Savannah River ...

27

Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Savannah River Savannah River Following are compliance agreements for the Savannah River Site. Also included are short summaries of the agreements. Natural Resources Defense Council Consent Decree, May 26, 1988 Natural Resources Defense Council Consent Decree, May 26, 1988 Summary Savannah River Site Consent Order 99-155-W, October 11, 1999 Savannah River Site Consent Order 99-155-W, October 11, 1999 Summary Savannah River Site Consent Order 85-70-SW, November 7, 1985 Savannah River Site Consent Order 85-70-SW, November 7, 1985 Summary Savannah River Site Consent Order 95-22-HW, September 29, 1995 Savannah River Site Consent Order 95-22-HW, September 29, 1995 Summary Savannah River Site Consent Order 99-21-HW, July 13, 1999 Savannah River Site Consent Order 99-21-HW, July 13, 1999 Summary

28

from Savannah River National Laboratory  

operated by Savannah River Nuclear Solutions. SRNL offers innovative solutions ... The decommissioning of F Area at the Savannah River Site involves long-term management

29

Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River River Savannah River Following are compliance agreements for the Savannah River Site. Also included are short summaries of the agreements. Natural Resources Defense Council Consent Decree, May 26, 1988 Natural Resources Defense Council Consent Decree, May 26, 1988 Summary Savannah River Site Consent Order 99-155-W, October 11, 1999 Savannah River Site Consent Order 99-155-W, October 11, 1999 Summary Savannah River Site Consent Order 85-70-SW, November 7, 1985 Savannah River Site Consent Order 85-70-SW, November 7, 1985 Summary Savannah River Site Consent Order 95-22-HW, September 29, 1995 Savannah River Site Consent Order 95-22-HW, September 29, 1995 Summary Savannah River Site Consent Order 99-21-HW, July 13, 1999 Savannah River Site Consent Order 99-21-HW, July 13, 1999 Summary

30

Savannah River National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Savannah River National Laboratory Savannah River National Laboratory srnl.doe.gov SRNL is a DOE National Laboratory operated by Savannah River Nuclear Solutions. At a glance Additive Manufacturing (3D Printing): Selectively Printed Conductive Pathways Researchers at the Savannah River National Laboratory (SRNL) have developed a rapid prototype conductive material that can be used for electrical shielding or circuit fabrication. Background Several rapid prototype technologies currently exist. A few of the technologies produce metallic parts, but the majority produce nonconductive parts made from various grades of plastic. In all of these technologies however, only conductive material or nonconductive material can be used within one part created. There is no known option for 3D printing conductive material for

31

from Savannah River National Laboratory  

Operated by Savannah River Nuclear Solutions for the U.S. Department of Energy near Aiken, S.C. E from Savannah River National Laboratory PAGE 2 OF 2 ...

32

Savannah River Nuclear Solutions LLC  

Savannah River Nuclear Solutions LLC Permission to Publish KNOW ALL MEN BY THESE PRESENTS, that the undersigned (hereinafter referred to

33

Savannah River National Laboratory  

The Savannah iver Site and the Savannah iver ational aoratory are owned y the .S. Department of nergy and are managed and operated y Savannah iver uclear Solutions.

34

Savannah River Site - Enforcement Documents  

NLE Websites -- All DOE Office Websites (Extended Search)

Enforcement Documents Enforcement Documents Savannah River Site Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Puncture Wound Injury resulting in a Radiological Uptake at the Savannah River Site, July 22, 2011 (NEA-2011-02) Consent Order issued to Parsons Infrastructure & Technology Group, Inc., related to Nuclear Facility Construction Deficiencies and Subcontractor Oversight at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter issued to Amer Industrial Technologies, Inc. related to Weld Deficiencies at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter issued to Parsons Technology Development & Fabrication Complex related to Deficiencies in the Fabrication of Safety Significant Embed Plates at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010

35

about Savannah River National Laboratory  

Savannah River Nuclear Solutions ... Office of Environmental Management Applied research ... in the areas of national security, clean energy and environmental stewardship

36

from Savannah River National Laoratory  

of Energy’s Savannah River Site near Aiken, South Carolina ... guidance for understanding natural complexity and heterogeneity in the environment. Impact

37

about Savannah River National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Tritium Effects on Materials In an effort to ensure the safety of the nation's nuclear weapons stockpile, the Savannah River National Laboratory (SRNL) maintains an active role in...

38

Savannah River National Laboratory  

Functionality over the Internet Authenticity schemes to ensure validity of data Patent applied for. The Savannah iver Site and the Savannah iver ational

39

Savannah River Site Homepage  

NLE Websites -- All DOE Office Websites (Extended Search)

7/2014 7/2014 SEARCH GO News Releases Video Releases Upcoming Events 12.31.13 Dr. Sam Fink Earns Donald Orth Lifetime Achievement Award 12.31.13 Savannah River Remediation Issues Fiscal Year 2013 Annual Report 12.18.13 Prototype System Brings Advantages of Wireless Technology to Secure Environment CLICK HERE FOR ADDITIONAL NEWS RELEASES CLICK HERE for our email news service, govDELIVERY 2013 PMI Project of the Year Award - Click to play on YouTube 2013 PMI Project of the Year Award Finalist: SRS Recovery Act Project PLAY VIDEO CLICK HERE FOR ADDITIONAL VIDEO RELEASES Enterprise.SRS - Safety and Security begin with me! SRS Status & Emergency Information * Cold War Patriot's Resource Fair - Aiken, SC (04.25.13) * 3rd Annual Small Modular Reactor Conference - Columbia, SC (04.16-17.13)

40

Savannah River Operations Office Homepage  

NLE Websites -- All DOE Office Websites

Savannah River Operations banner art and link to DOE Link to Energy.gov Link to Energy.gov National Day of Remembrance NOTICE TO USERS Use of this system constitutes consent to...

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Savannah River Site Waste Solidification Building Corrective...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HIAR SRS-2013-5-07 Site: Savannah River Site Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Savannah...

42

Accelerating Clean-up at Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River More Documents & Publications Integrated Project Team RM...

43

Savannah River Site: Plutonium Preparation Project (PuPP) at...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site: Plutonium Preparation Project (PuPP) at Savannah River Site Savannah River Site: Plutonium Preparation Project (PuPP) at Savannah River Site Full Document and Summary...

44

Savannah River Tank Waste Residuals  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah Savannah River Savannah River Tank Waste Residuals HLW Corporate Board November 6, 2008 1 November 6, 2008 Presentation By Sherri R. Ross Department of Energy Savannah River Operations Office The Issue * How clean is clean? * Ultimate Challenge - Justify highly radioactive radionuclides have been removed to the maximum extent practical? 2 removed to the maximum extent practical? - Building compelling regulatory documentation that will withstand intense scrutiny §3116 Requirements 1. Does not require disposal in deep geological repository 2. Highly radioactive radionuclides removed to the maximum extent practical 3. Meet the performance objectives in 10 CFR Part 3 3. Meet the performance objectives in 10 CFR Part 61, Subpart C 4. Waste disposed pursuant to a State-approved closure plan or permit Note: If it is anticipated that Class C disposal limits will be exceeded, additional

45

Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Savannah River Site Savannah River Site Savannah River Site | June 2011 Aerial View Savannah River Site | June 2011 Aerial View Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable management of tritium resources; by contributing to the stockpile surveillance program; and by assisting in the development of alternatives for large-scale pit disassembly/conversion capability. SRS also manages excess nuclear materials and supports nuclear nonproliferation initiatives. Environmental stewardship activities include the management, treatment, and disposal of radioactive, hazardous, and mixed wastes. Enforcement April 13, 2010 Consent Order, Parsons Infrastructure & Technology Group, Inc. -

46

Savannah River National Laboratory - Home  

NLE Websites -- All DOE Office Websites

SRNL Logo SRNL and DOE logo art SRNL Logo SRNL and DOE logo art Top Menu Bar SRNL Update: Embassy Fellows Report A report co-authored by Savannah River National Laboratory Senior Advisory Engineer, Dr. Robert Sindelar, has been released. The report to the Government of Japan - Ministry of the Environment provides observations and recommendations on decontamination work and progress... >>MORE Portable Power Research at SRNL Hadron Technologies, Inc., a microwave technology and systems development and manufacturing company with offices in Tennessee and Colorado, has signed a license for a Hybrid Microwave and Off-Gas Treatment System developed by the Savannah River National Laboratory, the Department of Energy's applied science laboratory located at the Savannah River Site. >>MORE

47

Savannah River Site Environmental Implentation Plan  

SciTech Connect

This report describes the organizational responsibilities for the Savannah River Site Environmental program. Operations, Engineering and projects, Environment, safety, and health, Quality assurance, and the Savannah River Laboratory are described.

1989-08-01T23:59:59.000Z

48

PIA - Savannah River Operations Office Executive Commitment Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah...

49

DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Extend Savannah River Nuclear Solutions Contract at Savannah to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to September 2016 DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to September 2016 September 6, 2012 - 12:00pm Addthis Media Contact Bill Taylor 803-952-8564 bill.taylor@srs.gov Aiken, SC -- The Department of Energy's (DOE) Savannah River Operations Office today exercised its option to extend the current Savannah River Site Management and Operating contract with Savannah River Nuclear Solutions, LLC (SRNS) for an additional 38 months, from August 1, 2013 to September 2016. The SRNS contract was competatviely awareded January 10, 2008. The total value of the SRNS contract with the extension is approximately $8 billion. The current contract provides for management and operations of Savannah

50

G. A. Antaki Westinghouse Savannah River Company Savannah River Site  

Office of Scientific and Technical Information (OSTI)

W S R C: M S- 9 5 -0 0 0 8 W S R C: M S- 9 5 -0 0 0 8 Analytical Considerations in the Code Qualification of Piping Systems (U) by G. A. Antaki Westinghouse Savannah River Company Savannah River Site Aiken, South Carolina 29808 DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or respnsi- bility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Refer- ence herein to any specific commercial product, process, or service by trade name, trademark,

51

Independent Activity Report, Savannah River Operation - June 2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Operation - June 2010 Savannah River Operation - June 2010 Independent Activity Report, Savannah River Operation - June 2010 June 2010 Savannah River Operations Office Self-Assessment of the Technical Qualification Program The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR) self-assessment of the Technical Qualification Program (TQP). Independent Activity Report, Savannah River Operation - June 2010 More Documents & Publications Independent Oversight Review, Savannah River Operations Office - July 2013 Independent Activity Report, Savannah River Remediation - July 2010 2011 Annual Workforce Analysis and Staffing Plan Report - Savannah River

52

Independent Oversight Activity Report, Savannah River Site -...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Security (HSS) (Reference 1). Meet with the SRS WSB project staff and Savannah River Nuclear Solutions (SRNS) engineers to discuss the proposed corrective actions discussed in...

53

from Savannah River Nuclear Solutions, LLC NEWS  

NLE Websites -- All DOE Office Websites (Extended Search)

and communications campaign known as "Safety Begins with Me" led by Savannah River Nuclear Solutions, LLC (SRNS). Banners are flying over roadways, safety-related stories fill...

54

Savannah River Site, Health Physics Instrument Calibration ...  

Science Conference Proceedings (OSTI)

... Send E-Mail to Laboratory: Savannah River Nuclear Solutions, LLC ... for Alarming Personal Radiation Detection for Homeland Security, Clause 7 ...

2013-09-20T23:59:59.000Z

55

WASTE INVENTORY DATA AT OAK RIDGEAND SAVANNAH RIVER, IG-0434...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WASTE INVENTORY DATA AT OAK RIDGEAND SAVANNAH RIVER, IG-0434 WASTE INVENTORY DATA AT OAK RIDGEAND SAVANNAH RIVER, IG-0434 The Oak Ridge and Savannah River Operations Offices are...

56

U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...  

NLE Websites -- All DOE Office Websites (Extended Search)

The Savannah River Site and the Savannah River National Laboratory are owned by the U.S. Department of Energy, and are managed and operated by Savannah River Nuclear...

57

Accelerating Clean-up at Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River More Documents & Publications Accelerating Clean-up at...

58

Accelerating Clean-up at Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River More Documents & Publications Project NameDescription Slide...

59

U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...  

NLE Websites -- All DOE Office Websites (Extended Search)

validity of data Patent applied for Savannah River National Laboratory The Savannah River Site and the Savannah River National Laboratory are owned by the U.S. Department of...

60

PIA - Savannah River Operations Office Executive Commitment Action...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive Commitment Action Tracking System PIA - Savannah River Operations Office Executive...

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

PIA - Savannah River Nuclear Solution SRNS ProRad Environment...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRNS ProRad Environment Management PIA - Savannah River Nuclear Solution SRNS ProRad Environment Management PIA - Savannah River Nuclear Solution SRNS ProRad Environment Management...

62

Department of Energy Cites Savannah River Nuclear Solutions,...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Nuclear Solutions, LLC for Worker Safety and Health Violations Department of Energy Cites Savannah River Nuclear Solutions, LLC for Worker Safety and Health...

63

PIA - Savannah River Nuclear Solutions Training Records and Informatio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Records and Information Network (TRAIN) PIA - Savannah River Nuclear Solutions Training Records and Information Network (TRAIN) PIA - Savannah River Nuclear Solutions...

64

PIA - Savannah River Nuclear Solutions Training Records and Informatio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PIA - Savannah River Nuclear Solutions Training Records and Information Network (TRAIN) PIA - Savannah River Nuclear Solutions Training Records and Information Network (TRAIN) PIA...

65

Savannah River's Biomass Steam Plant Success with Clean and Renewable...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River's Biomass Steam Plant Success with Clean and Renewable Energy Savannah River's Biomass Steam Plant Success with Clean and Renewable Energy In order to meet the...

66

Consolidation of Surplus Plutonium at Savannah River Site | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Management Nuclear Materials & Waste Consolidation of Surplus Plutonium at Savannah River Site Consolidation of Surplus Plutonium at Savannah River Site Waste...

67

Independent Oversight Review, Savannah River Site Salt Waste...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Salt Waste Processing Facility - August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review...

68

Principal Media Contact: DT Townsend Savannah River Nuclear Solutions...  

NLE Websites -- All DOE Office Websites (Extended Search)

Central Savannah River Area that have previously participated in the DOE Savannah River Science Bowl academic competition. These students have a demonstrated interest and...

69

Savannah River National Laboratory Meets with Historically Black...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River National Laboratory Meets with Historically Black Colleges and Universities Savannah River National Laboratory Meets with Historically Black Colleges and...

70

2013 Annual Planning Summary for the Savannah River Operations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Annual Planning Summary for the Savannah River Operations Office 2013 Annual Planning Summary for the Savannah River Operations Office 2013 Annual Planning Summary for the...

71

2013 Annual Planning Summary for the Savannah River Operations...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2013 Annual Planning Summary for the Savannah River Operations Office 2013 Annual Planning Summary for the Savannah River Operations Office 2013 Annual Planning Summary for the...

72

Inspection of Savannah River Operations Office Managementof Emergency...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Operations Office Managementof Emergency Response and Law Enforcement-Related Grants, IG-0604 Inspection of Savannah River Operations Office Managementof Emergency...

73

Savannah River Site Environmental Report for 1998  

Science Conference Proceedings (OSTI)

The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program.

Arnett, M.

1999-06-09T23:59:59.000Z

74

EIS-0082-S2: Savannah River Site Salt Processing, Savannah River Site,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

082-S2: Savannah River Site Salt Processing, Savannah River 082-S2: Savannah River Site Salt Processing, Savannah River Site, Aiken, South Carolina EIS-0082-S2: Savannah River Site Salt Processing, Savannah River Site, Aiken, South Carolina SUMMARY This SEIS evaluates the potential environmental impacts of alternatives for separating the high-activity fraction from the low-activity fraction of the high-level radioactive waste salt solutions now stored in underground tanks at the Savannah River Site (SRS) near Aiken, South Carolina. The high-activity fraction of the high-level waste (HLW) salt solution would then be vitrified in the Defense Waste Processing Facility (DWPF) and stored until it could be disposed of as HLW in a geologic repository. The low activity fraction would be disposed of as low-level waste (saltstone)

75

Independent Oversight Review, Savannah River Operations Office- August 2013  

Energy.gov (U.S. Department of Energy (DOE))

Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development.

76

Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Remediation Intern Sees Nuclear Industry as Job Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity July 9, 2012 - 10:00am Addthis Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Maddie M. Blair Public Affairs Intern, Savannah River Remediation Why does she keep coming back? "There are so many fascinating processes, people, and work

77

Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Remediation Intern Sees Nuclear Industry as Job Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity Savannah River Remediation Intern Sees Nuclear Industry as Job Opportunity July 9, 2012 - 10:00am Addthis Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Spencer Isom, second year engineering intern for Savannah River Remediation (SRR) and fourth summer at Savannah River Site (SRS), performs a standard equipment check at Saltstone Production Facility. | Photo courtesy of Savannah River Site Maddie M. Blair Public Affairs Intern, Savannah River Remediation Why does she keep coming back? "There are so many fascinating processes, people, and work

78

Oversight Reports - Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Savannah River Site Oversight Reports - Savannah River Site September 4, 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development. August 5, 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 Review of the Employee Concerns Program at the Savannah River Operations Office July 25, 2013 Independent Oversight Activity Report, Savannah River Site Waste Solidification Building Savannah River Site Waste Solidification Building Corrective Actions from the January 2013 Report on Construction Quality of Mechanical Systems Installation and Fire Protection Design [HIAR SRS-2013-5-07] April 22, 2013 Independent Activity Report, Savannah River Site - March 2013

79

Savannah River Site Environmental Report for 1997  

Science Conference Proceedings (OSTI)

The mission at the Savannah River Site has changed from the production of nuclear weapons materials for national defense to the management of waste, restoration of the environment, and the development of industry in and around the site.

Arnett, M.W.; Mamatey, A.R. [eds.

1998-08-01T23:59:59.000Z

80

First Savannah River Shipment Arrives At WIPP  

NLE Websites -- All DOE Office Websites (Extended Search)

First Savannah River Site Shipment Arrives At WIPP CARLSBAD, N.M., May 10, 2001 - The U.S. Department of Energy's (DOE) Carlsbad Field Office today announced that the first...

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Contractor Fee Payments- Savannah River Site Office  

Energy.gov (U.S. Department of Energy (DOE))

See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts. 

82

Lance Lab Research | Savannah River Ecology Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

from a Cu study On the Savannah River Site we have access to several areas with coal fly ash contamination. We also are looking at the effects of coal combustion wastes on...

83

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 24, 2011 February 24, 2011 CX-005504: Categorical Exclusion Determination Analytical Methods for Radiochemical Measurements CX(s) Applied: B3.6 Date: 02/24/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 24, 2011 CX-005503: Categorical Exclusion Determination Drain Line Replacement West of 735-A CX(s) Applied: B1.3 Date: 02/24/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 24, 2011 CX-005502: Categorical Exclusion Determination Implement Savannah River National Laboratory Defense Nuclear Facilities Safety Board 2004-2 Gap Closure Activity CX(s) Applied: B2.3 Date: 02/24/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

84

Independent Oversight Follow-up Review, Savannah River National Laboratory  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River National Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray release" and supporting information documented in the Savannah River National Laboratory (SRNL) WSRC-SA-2, SRNL Technical Area Documented Safety Analysis, Revision 10; WSRC-TS-97-00014, SRNL Technical Area Technical Safety Requirements,

85

Ichthyoplankton entrainment study at the SRS Savannah River water intakes for Westinghouse Savannah River Company  

SciTech Connect

Cooling water for L and K Reactors and makeup water for Par Pond is pumped from the Savannah River at the 1G, 3G, and 5G pump houses. Ichthyoplankton (drifting fish larvae and eggs) from the river are entrained into the reactor cooling systems with the river water and passed through the reactor's heat exchangers where temperatures may reach 70[degrees]C during full power operation. Ichthyoplankton mortality under such conditions is assumed to be 100 percent. The number of ichthyoplankton entrained into the cooling system depends on a variety of variables, including time of year, density and distribution of ichthyoplankton in the river, discharge levels in the river, and the volume of water withdrawn by the pumps. Entrainment at the 1 G pump house, which is immediately downstream from the confluence of Upper Three Runs Creek and the Savannah River, is also influenced by discharge rates and ichthyoplankton densities in Upper Three Runs Creek. Because of the anticipated restart of several SRS reactors and the growing concern surrounding striped bass and American shad stocks in the Savannah River, the Department of Energy requested that the Environmental Sciences Section (ESS) of the Savannah River Laboratory sample ichthyoplankton at the SRS Savannah River intakes. Dams Moore, Inc., under a contract with Westinghouse Savannah River Company performed the sampling and data analysis for the ESS.

Paller, M. (Westinghouse Savannah River Co., Aiken, SC (United States))

1992-03-26T23:59:59.000Z

86

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 10, 2010 March 10, 2010 CX-001373: Categorical Exclusion Determination Analytical Development Tritium Support Laboratory for Mass Spectroscopy, Infrared Spectroscopy, and Raman CX(s) Applied: B3.6 Date: 03/10/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 10, 2010 CX-001372: Categorical Exclusion Determination On-Dock Rail Straddle Portal Prototype Project, Y580 CX(s) Applied: B3.6 Date: 03/10/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office March 4, 2010 CX-001129: Categorical Exclusion Determination Cut and Cap Firewater Line Tap-Off Near 714-7N CX(s) Applied: B1.3 Date: 03/04/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

87

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 20, 2011 July 20, 2011 CX-006620: Categorical Exclusion Determination Relocate Hydroburst System from 238-H to 234-7H CX(s) Applied: B1.31 Date: 07/20/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 18, 2011 CX-006619: Categorical Exclusion Determination Install Seventeen Monitoring Wells Around 715-D CX(s) Applied: B3.1 Date: 07/18/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 18, 2011 CX-006618: Categorical Exclusion Determination Disable F-Tank Farm (FTF) Air Compressor Sequencer CX(s) Applied: B1.3 Date: 07/18/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 18, 2011 CX-006617: Categorical Exclusion Determination E Area Fire Water Extension CX(s) Applied: B1.15

88

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 16, 2010 April 16, 2010 CX-002207: Categorical Exclusion Determination Thin Films for Whisker Growth CX(s) Applied: B3.6 Date: 04/16/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 16, 2010 CX-002206: Categorical Exclusion Determination Real-Waste Testing of Enhanced Chemical Cleaning for Sludge Heel Removal CX(s) Applied: B3.6 Date: 04/16/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 16, 2010 CX-002208: Categorical Exclusion Determination Monitor Instruments Mass Spectrometer at Aiken County Technology Laboratory CX(s) Applied: B3.6 Date: 04/16/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

89

Savannah River Site | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Site | National Nuclear Security Administration Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Locations > Savannah River Site Savannah River Site http://www.srs.gov/general/srs-home.html Field Office: Located south of Aiken, South Carolina, the Savannah River Field Office (SRFO) is responsible for the NNSA Defense Program missions at

90

Savannah River Site Waste Disposition Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Terrel J. Spears Terrel J. Spears Assistant Manager Waste Disposition Project DOE Savannah River Operations Office Savannah River Site Savannah River Site Waste Disposition Project Waste Disposition Project 2 Waste Disposition Project - Mission Radioactive Liquid Waste - Tank Waste Stabilization and Disposition - Disposition 36 million gallons of radioactive liquid waste - Close 49 underground storage tanks in which the waste now resides 3 36.7 Million 33.7 Mgal (92%) 3.0 Mgal (8%) Saltcake Sludge Salt Supernate Volume Curies 397 Million Curies (MCi) 212 MCi (54%) 185 MCi (46%) Gallons (Mgal) 36.5 Million 33.5 Mgal (92%) 3.0 Mgal (8%) Liquid Waste Background Liquid Waste Background * 2 tanks closed * 49 tanks remaining to close - aging, carbon steel - 27 compliant, 22 non-compliant - 12 have known leak sites

91

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 20, 2011 June 20, 2011 CX-006372: Categorical Exclusion Determination Well Installations at R-Area Operable Unit CX(s) Applied: B3.1 Date: 06/20/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 15, 2011 CX-006373: Categorical Exclusion Determination Connect 735-11A to the Central Plant Chilled Water System CX(s) Applied: B1.3 Date: 06/15/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 14, 2011 CX-006375: Categorical Exclusion Determination Replace Transfer Lines with Spare Lines CX(s) Applied: B1.3 Date: 06/14/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 14, 2011 CX-006374: Categorical Exclusion Determination

92

Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Savannah River Site Savannah River Site Work is under way to decommission the Heavy Water Components Test Reactor, which had been used to test experimental fuel assemblies for commercial heavy-water power reactors. SRS is scheduled to remove the dome of the reactor this month (January 2011). Workers also will displace the reactor vessel and steam generators, grout the remaining structure in place, and install a concrete cover over the reactor's footprint Work is under way to decommission the Heavy Water Components Test Reactor, which had been used to test experimental fuel assemblies for commercial heavy-water power reactors. SRS is scheduled to remove the dome of the reactor this month (January 2011). Workers also will displace the reactor vessel and steam generators, grout the remaining structure in place, and

93

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 23, 2009 June 23, 2009 CX-000497: Categorical Exclusion Determination F-Canyon Complex Deactivation CX(s) Applied: B1.28 Date: 06/23/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 15, 2009 CX-000495: Categorical Exclusion Determination M-Area Chemical Oxidation (MACO) - Installation of Southern Sector Coreholes and Monitoring Wells Date: 06/15/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 15, 2009 CX-000496: Categorical Exclusion Determination F Area Hazardous Waste Management Facility Silver Chloride Solution Injection Wells CX(s) Applied: B6.2 Date: 06/15/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

94

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 2, 2009 September 2, 2009 CX-000521: Categorical Exclusion Determination Cut and Cap #325 Steam Supply Header, 261-H Consolidated Incineration Facility CX(s) Applied: B1.27 Date: 09/02/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office September 2, 2009 CX-000520: Categorical Exclusion Determination 690-N (Ford Building) Fire System Isolation and Sanitary Sewer Grouting CX(s) Applied: B1.27 Date: 09/02/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office September 1, 2009 CX-000519: Categorical Exclusion Determination E-Area Box Remediation Project CX(s) Applied: B6.6 Date: 09/01/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

95

Savannah River Site | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Site | National Nuclear Security Administration Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Locations > Savannah River Site Savannah River Site http://www.srs.gov/general/srs-home.html Field Office: Located south of Aiken, South Carolina, the Savannah River Field Office (SRFO) is responsible for the NNSA Defense Program missions at

96

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 9, 2010 August 9, 2010 CX-003633: Categorical Exclusion Determination Install Platform and Stairs at F-10 Outfall CX(s) Applied: B2.3 Date: 08/09/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office August 4, 2010 CX-003635: Categorical Exclusion Determination D-Area Chemical Truck Unloading Station CX(s) Applied: B2.5 Date: 08/04/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office August 4, 2010 CX-003636: Categorical Exclusion Determination 484-D Sump Discharge Line Installation CX(s) Applied: B1.3 Date: 08/04/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 30, 2010 CX-003640: Categorical Exclusion Determination Howard T. Ricketts Laboratory (HTRL) Lab 134 CX(s) Applied: B3.6

97

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 20, 2011 April 20, 2011 CX-005766: Categorical Exclusion Determination Filter Testing with Static Test Cell CX(s) Applied: B3.6 Date: 04/20/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 19, 2011 CX-005769: Categorical Exclusion Determination Dismantle and Removal (D&R) and Enhance Chemical Cleaning (ECC) on Waste Tank 8F (General) CX(s) Applied: B1.28 Date: 04/19/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office April 15, 2011 CX-005771: Categorical Exclusion Determination Install Alternate Diesel Generator and Tie-In Connection for HB-Line CX(s) Applied: B2.5 Date: 04/15/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

98

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 23, 2010 February 23, 2010 CX-001128: Categorical Exclusion Determination Closure of 607-10G Septic Tank (Served 661-G) CX(s) Applied: B1.27 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010 CX-001127: Categorical Exclusion Determination Ballistic Resistant Enclosure Hatch Counterbalance CX(s) Applied: B2.5 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010 CX-000878: Categorical Exclusion Determination 293-F Stack Risk Reduction Project CX(s) Applied: B1.28 Date: 02/23/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office February 23, 2010

99

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 11, 2009 August 11, 2009 CX-000513: Categorical Exclusion Determination Cone Penetration Test sampling at ECODS (Early Construction and Operational Disposal Sites) B3 and B5 CX(s) Applied: B3.1 Date: 08/11/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000511: Categorical Exclusion Determination Isolation of Domestic Water Line, 782-4G CX(s) Applied: B1.3 Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office August 5, 2009 CX-000512: Categorical Exclusion Determination Tree Removal and Chipping at P-Area Ash Basin and R-Area Ash Basin and P-007 Outfall Date: 08/05/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office

100

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 25, 2010 October 25, 2010 CX-004445: Categorical Exclusion Determination Waste Treatment Plant Secondary Waste Radioactive Fluidized Bed Steam Reforming (Module A) CX(s) Applied: B3.6 Date: 10/25/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office October 15, 2010 CX-004450: Categorical Exclusion Determination Plutonium Glass Sectioning CX(s) Applied: B3.6 Date: 10/15/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office October 15, 2010 CX-004449: Categorical Exclusion Determination Bench Scale Testing to Provide Data on Precipitation Control in the Cesium Nitric Acid Recovery Process CX(s) Applied: B3.6 Date: 10/15/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office October 15, 2010

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 10, 2010 December 10, 2010 CX-004837: Categorical Exclusion Determination Measurement of Compressive Strength CX(s) Applied: B3.6 Date: 12/10/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 7, 2010 CX-004826: Categorical Exclusion Determination Piezometer Well Installation for 1,4-Dioxane Monitoring CX(s) Applied: B3.1 Date: 12/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 7, 2010 CX-004824: Categorical Exclusion Determination Dismantle and Remove Tank 6 Riser 7 for Waste Determination (WD) Sampling CX(s) Applied: B1.3 Date: 12/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office December 7, 2010 CX-004823: Categorical Exclusion Determination Consolidation of K- and L-Area Heavy Water in C-Area

102

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 24, 2011 January 24, 2011 CX-005090: Categorical Exclusion Determination Stairway to FM-1H CX(s) Applied: B2.3 Date: 01/24/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office January 21, 2011 CX-005109: Categorical Exclusion Determination Y589, Mobile Digital Radiography Identification System - Station CX(s) Applied: B1.15 Date: 01/21/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office January 20, 2011 CX-005108: Categorical Exclusion Determination Thin Films for Whisker Growth CX(s) Applied: B3.6 Date: 01/20/2011 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office January 19, 2011 CX-005107: Categorical Exclusion Determination Karl Fisher Titration CX(s) Applied: B3.6 Date: 01/19/2011

103

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 29, 2010 November 29, 2010 CX-004808: Categorical Exclusion Determination Flowsheet Evaluation for the Neutralization of High Aluminum ? Low Uranium Used Nuclear Fuel (UNF) Solution CX(s) Applied: B3.6 Date: 11/29/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office November 29, 2010 CX-004809: Categorical Exclusion Determination Reactive Gas Reprocessing of Used Nuclear Fuel Simulants CX(s) Applied: B3.6 Date: 11/29/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office November 29, 2010 CX-004806: Categorical Exclusion Determination Volume Measurement of Solids by Gas Pycnometry CX(s) Applied: B3.6 Date: 11/29/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office November 12, 2010 CX-004805: Categorical Exclusion Determination

104

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 11, 2009 December 11, 2009 CX-000815: Categorical Exclusion Determination Hydrogen Technology Laboratory 140 - Chromatography, Wet Laboratory CX(s) Applied: B3.6 Date: 12/11/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 8, 2009 CX-000819: Categorical Exclusion Determination Thin-Film Development Laboratory CX(s) Applied: B3.6 Date: 12/08/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 8, 2009 CX-000820: Categorical Exclusion Determination Vacuum Induction Melting of Metals CX(s) Applied: B3.6 Date: 12/08/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 8, 2009 CX-000818: Categorical Exclusion Determination

105

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 20, 2010 July 20, 2010 CX-003668: Categorical Exclusion Determination Subsurface Soils Exploration for Potential Pit Disassembly and Conversion Project Sandfilter Footprint CX(s) Applied: B3.1 Date: 07/20/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 7, 2010 CX-003670: Categorical Exclusion Determination Improvements to L Area Sidewalks CX(s) Applied: B1.3 Date: 07/07/2010 Location(s): Aiken, South Carolina Office(s): Savannah River Operations Office July 7, 2010 CX-002984: Categorical Exclusion Determination Improvements to L Area Sidewalks CX(s) Applied: B1.3 Date: 07/07/2010 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office June 25, 2010 CX-003671: Categorical Exclusion Determination

106

Independent Oversight Follow-up Review, Savannah River National Laboratory- January 2012  

Energy.gov (U.S. Department of Energy (DOE))

Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site

107

EIS-0217: Savannah River Site Waste Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17: Savannah River Site Waste Management 17: Savannah River Site Waste Management EIS-0217: Savannah River Site Waste Management Summary This EIS evaluates the potential environmental impacts and costs of storing, treating, and/or disposing of liquid high-level radioactive, low-level radioactive, hazardous, mixed (radioactive and hazardous), and transuranic wastes at SRS. Public Comment Opportunities None available at this time. Documents Available for Download June 28, 2001 EIS-0217: Amended Record of Decision Savannah River Site Waste Management, Savannah River Operations Office, Aiken, South Carolina May 19, 1997 EIS-0217: Supplemental Record of Decision Savannah River Site Waste Management May 19, 1997 EIS-0217: Supplemental Record of Decision Savannah River Site Waste Management, Savannah River Operations Office,

108

Preliminary Notice of Violation, Westinghouse Savannah River Company - EA  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Notice of Violation, Westinghouse Savannah River Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 September 21, 1998 Preliminary Notice of Violation issued to Westinghouse Savannah River Company, related to Bioassay Program Deficiencies at the Savannah River Site, (EA-98-09) This letter refers to the Department of Energy's (DOE) investigation of the facts and circumstances concerning deficiencies in Westinghouse Savannah River Company's (WSRC) bioassay participation requirements and WSRC's corrective actions to remedy those deficiencies. Preliminary Notice of Violation, Westinghouse Savannah River Company - EA 98-09 More Documents & Publications Preliminary Notice of Violation, Westinghouse Savannah River Company -

109

Independent Activity Report, Savannah River Site - March 2013 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site - March 2013 Savannah River Site - March 2013 Independent Activity Report, Savannah River Site - March 2013 March 2013 Oversight Scheduling an Operational Awareness at the Savannah River Site [HIAR-SRS-2013-03-25] Activity Description/Purpose: The Independent Oversight Site Lead for the Savannah River Site traveled to the site to work with functional area managers to schedule nuclear safety oversight activities. The Site Lead reviewed the differing professional opinion (DPO) program at the Savannah River Operations Office (Department of Energy (DOE)-SR). Independent Activity Report, Savannah River Site - March 2013 More Documents & Publications Independent Oversight Review, Savannah River Operations Office - July 2013 Policy Flash 2013-74 Quarterly Notification of the DOE's Differing

110

Savannah River Site Achieves Transuranic Waste Disposition Goal in 2013 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Achieves Transuranic Waste Disposition Goal in Savannah River Site Achieves Transuranic Waste Disposition Goal in 2013 Savannah River Site Achieves Transuranic Waste Disposition Goal in 2013 December 24, 2013 - 12:00pm Addthis Workers gather behind a “Safety and Security begins with Me” banner at the Savannah River Site. Workers gather behind a "Safety and Security begins with Me" banner at the Savannah River Site. Workers sort through transuranic waste at the Savannah River Site. Workers sort through transuranic waste at the Savannah River Site. SRR employees Glenn Kelly and Fred Merriweather pour the final amount of grout into Tank 6. SRR employees Glenn Kelly and Fred Merriweather pour the final amount of grout into Tank 6. Workers gather behind a "Safety and Security begins with Me" banner at the Savannah River Site.

111

U. S. Department of Energy Savannah River Operations Office ...  

NLE Websites -- All DOE Office Websites (Extended Search)

Financial Officer for the U.S. Department of Energy Savannah River Operations Office (DOE-SR) at the Savannah River Site (SRS) in Aiken, South Carolina. Serving dual roles as...

112

U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...  

NLE Websites -- All DOE Office Websites (Extended Search)

SRNL Office of Communications 803.725.4396 Located at the U.S. Department of Energy's Savannah River Site near Aiken, South Carolina Operated by Savannah River Nuclear Solutions...

113

DOE Issues Salt Waste Determination for the Savannah River Site...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Salt Waste Determination for the Savannah River Site DOE Issues Salt Waste Determination for the Savannah River Site January 18, 2006 - 10:49am Addthis WASHINGTON, DC - The U.S....

114

Savannah River Ecology Laboratory FY2006 Annual Technical Progress Report  

SciTech Connect

FY2006 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of the University of Georgia operating on the Savannah River Site in Aiken, County, SC.

Paul M. Bertsch

2006-10-23T23:59:59.000Z

115

Savannah River Ecology Laboratory 2004 Annual Technical Progress Report  

SciTech Connect

2004 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of The University of Georgia operating on the Savannah River Site in Aiken, South Carolina

Paul M. Bertsch

2004-07-29T23:59:59.000Z

116

Savannah River Ecology Laboratory 2005 Annual Technical Progress Report  

SciTech Connect

2005 annual report of research conducted by the Savannah River Ecology Laboratory, a research unit of The University of Georgia operating on the Savannah River Site, Aiken, South Carolina

Paul M. Bertsch

2005-07-19T23:59:59.000Z

117

SAVANNAH RIVER TECHNOLOGY CENTER MONTHLY REPORT AUGUST 1992  

Science Conference Proceedings (OSTI)

'This monthly report summarizes Programs and Accomplishments of the Savannah River Technology Center in support of activities at the Savannah River Site. The following categories are addressed: Reactor, Tritium, Separations, Environmental, Waste Management, General, and Items of Interest.'

Ferrell, J.M.

1999-06-21T23:59:59.000Z

118

Radioiodine in the Savannah River Site environment  

Science Conference Proceedings (OSTI)

Radioiodine, which is the collective term for all radioactive isotopes of the element iodine, is formed at the Savannah River Site (SRS) principally as a by-product of nuclear reactor operations. Part of the radioiodine is released to the environment during reactor and reprocessing operations at the site. The purpose of this report is to provide an introduction to radioiodine production and disposition, its status in the environment, and the radiation dose and health risks as a consequence of its release to the environment around the Savannah River Plant. A rigorous dose reconstruction study is to be completed by thee Center for Disease Control during the 1990s.

Kantelo, M.V.; Bauer, L.R.; Marter, W.L.; Murphy, C.E. Jr.; Zeigler, C.C.

1993-01-15T23:59:59.000Z

119

PIA - Savannah River Nuclear Solution (SRNS) Energy Employees...  

NLE Websites -- All DOE Office Websites (Extended Search)

Employees Occupational Illness Compensation Program Act (EEOICPA) PIA - Savannah River Nuclear Solution (SRNS) Energy Employees Occupational Illness Compensation Program Act...

120

2012 Annual Planning Summary for Savannah River Operations Office  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Savannah River Operations Office.

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Terrestrial Carbon Inventory at the Savannah River Site, 1951 – 2001.  

Science Conference Proceedings (OSTI)

A Power Point slide presentation/report on the terestrial carbon inventory at the Savannah River Site.

US Forest Service - Annonymous,

2012-02-01T23:59:59.000Z

122

Savannah River's Biomass Steam Plant Success with Clean and Renewable...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

River's Biomass Steam Plant Success with Clean and Renewable Energy Savannah River's Biomass Steam Plant Success with Clean and Renewable Energy In order to meet the federal energy...

123

from Savannah River Nuclear Solutions, LLC NEWS Savannah River Tritium Enterprise Achieves High Marks for  

NLE Websites -- All DOE Office Websites (Extended Search)

Tritium Enterprise Achieves High Marks for Tritium Enterprise Achieves High Marks for Support to Nation's Security Fiscal Year 2012 Performance Prepares Enterprise for Continued Service AIKEN, S.C. (February 7, 2013) - The National Nuclear Security Administration (NNSA) has rated the Savannah River Tritium Enterprise's overall Fiscal Year 2012 performance as "excel- lent," meaning that the Savannah River Site's tritium-related work has once again success- fully met and exceeded NNSA's Defense Programs goals. The Savannah River Tritium Enterprise (SRTE), which is managed for NNSA by Savannah River Nuclear Solutions (SRNS), earned the rating for its successful performance of the four missions it carries out in support of the nation's security: tritium supply, nuclear stockpile maintenance,

124

Land Use Baseline Report Savannah River Site  

Science Conference Proceedings (OSTI)

This document is to serve as a resource for Savannah River Site managers, planners, and SRS stakeholders by providing a general description of the site and land-use factors important to future use decisions and plans. The intent of this document is to be comprehensive in its review of SRS and the surrounding area.

Noah, J.C.

1995-06-29T23:59:59.000Z

125

Savannah River Laboratory monthly report, February 1992  

Science Conference Proceedings (OSTI)

This report is a progress report for the Savannah River Laboratory for the month of February 1992. The progress and activities in six categories were described in the report. The categories are reactor, tritium, separations, environmental, waste management, and general. Each category described numerous and varied activities. Some examples of these activities described are such things as radiation monitoring, maintenance, modifications, and remedial action.

Ferrell, J.M. [comp.; Ice, L.W. [ed.

1992-02-01T23:59:59.000Z

126

Savannah River Technology Center. Monthly report  

SciTech Connect

This is a monthly progress report from the Savannah River Laboratory for the month of January 1993. It has sections with work in the areas of reactor safety, tritium processes and absorption, separations programs and wastes, environmental concerns and responses, waste management practices, and general concerns.

Not Available

1993-01-01T23:59:59.000Z

127

Savannah River National Laboratory Meets with Historically Black Colleges  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River National Laboratory Meets with Historically Black Savannah River National Laboratory Meets with Historically Black Colleges and Universities Savannah River National Laboratory Meets with Historically Black Colleges and Universities February 1, 2013 - 9:00am Addthis South Carolina State University students William Dumpson, left, and Alejandra Chirino, center, talk with Savannah River National Laboratory Director Dr. Terry Michalske at a recent research exchange involving the laboratory and seven historically black colleges and universities. South Carolina State University students William Dumpson, left, and Alejandra Chirino, center, talk with Savannah River National Laboratory Director Dr. Terry Michalske at a recent research exchange involving the laboratory and seven historically black colleges and universities.

128

Savannah River National Laboratory Meets with Historically Black Colleges  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River National Laboratory Meets with Historically Black Savannah River National Laboratory Meets with Historically Black Colleges and Universities Savannah River National Laboratory Meets with Historically Black Colleges and Universities February 1, 2013 - 9:00am Addthis South Carolina State University students William Dumpson, left, and Alejandra Chirino, center, talk with Savannah River National Laboratory Director Dr. Terry Michalske at a recent research exchange involving the laboratory and seven historically black colleges and universities. South Carolina State University students William Dumpson, left, and Alejandra Chirino, center, talk with Savannah River National Laboratory Director Dr. Terry Michalske at a recent research exchange involving the laboratory and seven historically black colleges and universities.

129

Independent Oversight Review, Savannah River Site - September 2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site - September 2011 Savannah River Site - September 2011 Independent Oversight Review, Savannah River Site - September 2011 September 2011 Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities The Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS), conducted an independent review of the Implementation Verification Review (IVR) Processes at Savannah River Site Environmental Management Nuclear Facilities. The overall objective of the Independent Oversight IVR review process includes verification that contractors and site offices have developed and implemented appropriate methods for performing IVRs (including direction for scheduling and conducting IVR activities) and measurement of the

130

Enforcement Documents - Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Savannah River Site Enforcement Documents - Savannah River Site April 13, 2010 Consent Order, Parsons Infrastructure & Technology Group, Inc. - NCO-2010-02 Consent Order issued to Parsons Infrastructure & Technology Group, Inc. related to Nuclear Facility Construction Deficiencies and Subcontractor Oversight at the Salt Waste Processing Facility at the Savannah River Site April 13, 2010 Enforcement Letter, Parsons Technology Development & Fabrication Complex - April 13, 2010 Enforcement Letter issued to Parsons Technology Development & Fabrication Complex related to Deficiencies in the Fabrication of Safety Significant Embed Plates at the Salt Waste Processing Facility at the Savannah River Site, April 13, 2010 Enforcement Letter, Amer Industrial Technologies - April 13, 2010

131

Independent Activity Report, Savannah River Site - July 2010 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Activity Report, Savannah River Site - July 2010 Independent Activity Report, Savannah River Site - July 2010 Independent Activity Report, Savannah River Site - July 2010 July 2010 Savannah River Site Salt Waste Processing Facility Construction Project Review A Department of Energy Construction Project Review (CPR) of the Salt Waste Processing Facility (SWPF) project was conducted on July 19-22, 2010, at the request of the Principal Deputy Secretary, Office of Environmental Management (EM-2). The purpose of the review was to assess the cost, schedule, and technical progress against the approved Performance Baseline. Independent Activity Report, Savannah River Site - July 2010 More Documents & Publications Independent Activity Report, Savannah River Site - September 2010 Independent Activity Report, Savannah River Site - May 2010

132

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 17, 2009 December 17, 2009 CX-000810: Categorical Exclusion Determination Ceramic Synthesis and Gas Permeation Measurements in 735-11A CX(s) Applied: B3.6 Date: 12/17/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 17, 2009 CX-000809: Categorical Exclusion Determination Cut, Remove and Replace Off-Gas Exhaust Fan #2 and #3 foundation and Replace Air Monitor Fan #1 and #2 CX(s) Applied: B1.3 Date: 12/17/2009 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office December 17, 2009 CX-000808: Categorical Exclusion Determination Howard T. Ricketts Regional Biocontainment Laboratory 134 CX(s) Applied: B3.6 Date: 12/17/2009 Location(s): Aiken, South Carolina

133

The Savannah River Site's Groundwater Monitoring Program  

Science Conference Proceedings (OSTI)

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-01-01T23:59:59.000Z

134

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 16, 2011 May 16, 2011 CX-006405: Categorical Exclusion Determination 707-C Storm Drain Repairs CX(s) Applied: B1.3 Date: 05/16/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 13, 2011 CX-006406: Categorical Exclusion Determination Silver Chloride Injection at the F Area Hazardous Waste Management Facilities Barrier Wall CX(s) Applied: B6.9 Date: 05/13/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, Savannah River Operations Office May 12, 2011 CX-006407: Categorical Exclusion Determination Removal of Inactive Chromate Water Isolation Valves CRW-V-170 and CRW-V-175 and Installation of 3 Inch Blind Flanges for F-area New Hill CX(s) Applied: B1.3 Date: 05/12/2011 Location(s): Aiken, South Carolina

135

Groundwater protection EIS: Existing environment: Savannah River  

SciTech Connect

Per Groundwater Protection EIS commitments, a baseline of surface water hydrology and chemistry of each onsite stream is needed to define the existing environment of each watershed so that environmental impacts associated with the various waste site closure options can be assessed. This report summarizes the existing water quality of the Savannah River; lists the various waste sites encompassing this watershed; and summarizes the availability of surface water and floodplain sediment monitoring data, both radiochemical and physiochemical, collected from this watershed.

Stejskal, G.F.

1985-10-25T23:59:59.000Z

136

Savannah River Technology Center monthly report  

Science Conference Proceedings (OSTI)

This is a monthly report published by Westinghouse Savannah River Company. Topics discussed in this progress report are: Terrazzo reservoir, Replacement Tritium Facility Final Safety Analysis Report, tritium processing and disposal, separation processes, environmental effects and future impacts, laboratory performance evaluation, groundwater characterization, mixed waste management facility, Raman Spectroscopy, waste processing, Defense Waste Processing Facility, mercury recycling, off-gas components testing, incineration facility blowdown solidification, and weld residual stress minimization study.

Ferrell, J.M.

1993-09-01T23:59:59.000Z

137

Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Ecology Laboratory - June 7, Savannah River Ecology Laboratory - June 7, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 June 7, 2000 Issued to Savannah River Ecology Laboratory related to Radioactive Material Control Deficiencies at the Savannah River Site This letter refers to the Department of Energy's (DOE) evaluation of radioactive material control deficiencies occurring at the Savannah River Ecology Laboratory (SREL) in September 1999. During the underlying event, SREL investigators transported radioactive environmental samples from the Ukraine to SREL and University of Georgia facilities without appropriate labeling, monitoring, and controls. These deficiencies were identified in September 1999; however, they were not formally reported to DOE via the Noncompliance Tracking System (NTS) until March 14, 2000. The Office

138

Savannah River Site Contractor Receives Project Management Institute Award  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Contractor Receives Project Management Savannah River Site Contractor Receives Project Management Institute Award Savannah River Site Contractor Receives Project Management Institute Award November 15, 2011 - 12:00pm Addthis SRR Bubbler Project Manager Bill Pepper, center, accepts the PMI Project of the Year award from Eloy Saldivar, left, president of the Savannah River Chapter of PMI. DWPF Facility Manager Les Sonnenberg is on the right. SRR Bubbler Project Manager Bill Pepper, center, accepts the PMI Project of the Year award from Eloy Saldivar, left, president of the Savannah River Chapter of PMI. DWPF Facility Manager Les Sonnenberg is on the right. AIKEN, S.C. - The local chapter of the Project Management Institute (PMI) recently honored the Savannah River Site liquid waste contractor with its

139

Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Company - April 15, Savannah River Company - April 15, 1997 Enforcement Letter, Westinghouse Savannah River Company - April 15, 1997 April 15, 1997 Issued to Westinghouse Savannah River Company related to Potential Violations of Quality Assurance and Work Process Requirements at the Savannah River Site On February 11, 1997, the Office of Enforcement and Investigation (EH-10) met with members of your staff and the DOE Savannah River Operations Office (DOE-SR) to review your progress in correcting the noncompliances identified in the subject Noncompliance Tracking System (NTS) reports. A summary of our meeting and assessment of the information provided is enclosed with this letter. Your evaluation of the events and conditions leading to each of the occurrences, reported to EH-10 in the subject NTS reports, has identified

140

Independent Activity Report, Savannah River Site - June 2010 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 2010 June 2010 Independent Activity Report, Savannah River Site - June 2010 June 2010 Savannah River Site Salt Waste Processing Facility Construction Site Orientation Visit The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an orientation visit on June 21-25, 2010, at the Salt Waste Processing Facility (SWPF) construction site at the DOE Savannah River Site (SRS). The purpose of the visit was to determine methods for HSS to carry out its independent oversight responsibilities with respect to this project in coordination with DOE's Savannah River Operations Office (DOE-SR). Independent Activity Report, Savannah River Site - June 2010 More Documents & Publications Independent Activity Report, Savannah River Site - May 2010

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

A Milestone for Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Milestone for Savannah River Site A Milestone for Savannah River Site A Milestone for Savannah River Site October 21, 2010 - 4:38pm Addthis Employees of the Savannah River Site's M Area Operable Unit (MAOU) gather at the completed site. Employees of the Savannah River Site's M Area Operable Unit (MAOU) gather at the completed site. Dr. Ines Triay I had the privilege yesterday to celebrate history and embrace the future at the first Savannah River Site (SRS) Area Completion under the American Recovery and Reinvestment Act. I was one of about 250 people gathered at the M Area Operable Unit (MAOU) area completion event that marked the end of an era at SRS. During the Cold War, M Area was the site of three support buildings used to fabricate fuel targets for the Site's reactors; home to the Liquid Effluent Treatment

142

Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Preliminary Notice of Violation, Savannah River Nuclear Solutions, Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC - WEA-2010-05 Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC - WEA-2010-05 October 7, 2010 Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Nitric Acid Spill Event and an Electrical Arc Flash Injury Event at the Savannah River Site This letter refers to the Office of Health, Safety and Security's Office of Enforcement investigation into the facts and circumstances surrounding the nitric acid spill event that occurred in F Area on August 18, 2009, and the electrical arc flash injury that occurred in the D Area powerhouse on September 23, 2009, at the Savannah River Site. Based on an evaluation of the evidence in this matter, the U.S. Department of Energy (DOE) has

143

A Milestone for Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A Milestone for Savannah River Site A Milestone for Savannah River Site A Milestone for Savannah River Site October 21, 2010 - 4:38pm Addthis Employees of the Savannah River Site's M Area Operable Unit (MAOU) gather at the completed site. Employees of the Savannah River Site's M Area Operable Unit (MAOU) gather at the completed site. Dr. Ines Triay I had the privilege yesterday to celebrate history and embrace the future at the first Savannah River Site (SRS) Area Completion under the American Recovery and Reinvestment Act. I was one of about 250 people gathered at the M Area Operable Unit (MAOU) area completion event that marked the end of an era at SRS. During the Cold War, M Area was the site of three support buildings used to fabricate fuel targets for the Site's reactors; home to the Liquid Effluent Treatment

144

Preliminary Notice of Violation,Savannah River Nuclear Solutions, LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Nuclear Solutions, Savannah River Nuclear Solutions, LLC - NEA-2011-02 Preliminary Notice of Violation,Savannah River Nuclear Solutions, LLC - NEA-2011-02 July 22, 2011 Preliminary Notice of Violation issued to Savannah River Nuclear Solutions, LLC related to a Puncture Wound Injury resulting in a Radiological Uptake at the Savannah River Site This letter refers to the Office of Health, Safety and Security's Office of Enforcement and Oversight investigation into the facts and circumstances associated with the June 14, 2010, employee puncture wound injury, which occurred in the F-TRU Remediation Enclosure within the F-Canyon Facility, at the U.S. Department of Energy' s (DOE) Savannah River Site. This occurrence was reported in Noncompliance Tracking System (NTS) report NTS-SRSO--SRNS-CPWM-20IO-0002, Contaminated Puncture Wound During TRU Drum

145

Independent Activity Report, Savannah River Site - May 2010 | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 2010 May 2010 Independent Activity Report, Savannah River Site - May 2010 May 2010 Savannah River Site Salt Waste Processing Facility Construction Site Walkthrough The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted a visit to the Savannah River Site (SRS) on May 4-5, 2010. The visit focused on the Salt Waste Processing Facility (SWPF) Construction Site, which is managed by Parsons with DOE line management program direction and oversight from the DOE Savannah River Operations Office. Independent Activity Report, Savannah River Site - May 2010 More Documents & Publications Independent Activity Report, Savannah River Site - June 2010 Consent Order, Parsons Infrastructure & Technology Group, Inc. -

146

Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Ecology Laboratory - June 7, Savannah River Ecology Laboratory - June 7, 2000 Enforcement Letter, Savannah River Ecology Laboratory - June 7, 2000 June 7, 2000 Issued to Savannah River Ecology Laboratory related to Radioactive Material Control Deficiencies at the Savannah River Site This letter refers to the Department of Energy's (DOE) evaluation of radioactive material control deficiencies occurring at the Savannah River Ecology Laboratory (SREL) in September 1999. During the underlying event, SREL investigators transported radioactive environmental samples from the Ukraine to SREL and University of Georgia facilities without appropriate labeling, monitoring, and controls. These deficiencies were identified in September 1999; however, they were not formally reported to DOE via the Noncompliance Tracking System (NTS) until March 14, 2000. The Office

147

John C. Barnes of Savannah River Operations named 2012 Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

John C. Barnes of Savannah River Operations named 2012 Facility John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year August 20, 2013 - 8:27am Addthis John C. Barnes of Savannah River Operations named 2012 Facility Representative of the Year About 200 Department of Energy (DOE) federal employees are Facility Representatives (FR) who provide day-to-day oversight of contractor operations at DOE facilities. Each year the Department presents the FR of the Year Award to recognize superior service. Mr. John C. Barnes from the Savannah River Operations Office was selected from a field of sixteen nominees as the 2012 DOE FR of the Year. He is responsible for operational oversight of key facilities at the Savannah River Site, including the F and

148

Independent Oversight Review, Savannah River Field Office Tritium  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Field Office Tritium Field Office Tritium Facilities - November 2013 Independent Oversight Review, Savannah River Field Office Tritium Facilities - November 2013 November 13, 2013 Review of Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of the radiological protection program at the Savannah River Site (SRS) tritium facilities implemented at the activity-level by Savannah River Nuclear Solutions, LLC and its subcontractors. The review was performed by the Office of Health, Safety and Security's Office of Safety and Emergency Management Evaluations within the broader context of an ongoing program of targeted assessments of radiological control programs, with an emphasis on

149

Workforce Statistics - Savannah River Field Office | National Nuclear  

National Nuclear Security Administration (NNSA)

Savannah River Field Office | National Nuclear Savannah River Field Office | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Workforce Statistics - Savannah River Field Office Home > About Us > Our Operations > Management and Budget > Office of Civil Rights > Workforce Statistics > Workforce Statistics - Savannah River Field

150

Independent Oversight Review, Savannah River Site- June 2012  

Energy.gov (U.S. Department of Energy (DOE))

Review of Electrical System Configuration Management, Safety Instrumented System Commercial Grade Dedication, Setpoint Calculations, and Software Testing at the Savannah River Site, Waste Solidification Building Project

151

PIA - Savannah River Nuclear Solution SRNS Electronic Document...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management System (HRMS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing...

152

PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) PIA - Savannah River Nuclear Solution (SRNS) MedGate...

153

PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management System (HRMS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing...

154

PIA - Savannah River Nuclear Solutions (SRNS) Human Resource...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Procurement Cycle System (PCS) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing...

155

from Savannah River Nuclear Solutions, LLC NEWS SRNS Education...  

NLE Websites -- All DOE Office Websites (Extended Search)

the CSRA AIKEN, S.C. (August 23, 2012) - As another school year begins, Savannah River Nuclear Solutions, LLC Education Outreach Programs (EOP) prepares for another year of...

156

U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...  

NLE Websites -- All DOE Office Websites (Extended Search)

Boron-structured Nano-proportional Counters for Neutron Detection Scientists at the Savannah River National Laboratory (SRNL) have explored the use of nanotechnology to improve the...

157

DOE Selects Savannah River Remediation, LLC for Liquid Waste...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2009. Savannah River Remediation, LLC is a limited liability company consisting of URS Washington Division; Babcock & Wilcox Technical Services Group, Inc.; Bechtel National,...

158

Savannah River Site Fire Protection engineers work in the community...  

National Nuclear Security Administration (NNSA)

work in the community Posted By Office of Public Affairs Members of the Savannah River Tritium Enterprise's Fire Protection department have taken their expertise out into the local...

159

Savannah River maintains safety focus through multiple tasks...  

National Nuclear Security Administration (NNSA)

focus through multiple tasks Posted By Office of Public Affairs The Savannah River Tritium Enterprise took advantage of a recent multi-week outage to safely complete a...

160

Record of Decision for the Savannah River Site Spent Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Final Environmental Impact Statement, Aiken, SC AGENCY: Department of Energy (DOE). ACTION: Record of decision. SUMMARY: The Savannah River Site Spent Nuclear Fuel...

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Review of the Savannah River Site Tritium Facilities Implementation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Tritium Facilities Implementation Verification Review Processes June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and...

162

Review of Safety Basis Development for the Savannah River Site...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Subject: Review of Safety Basis Development for the Savannah River Site Salt Waste Processing Facility - Inspection Criteria, Approach, and Line: HS: Rev:...

163

2011 Annual Planning Summary for Savannah River Operations Office (SRS)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Savannah River Operations Office (SRS) (See also Environmental Management).

164

Savannah River Technology Center monthly report, January 1994  

SciTech Connect

This is the monthly progress report for the Savannah River Technology Center, which covers the following areas of interest, Tritium, Separation processes, Environmental Issues, and Waste Management.

Not Available

1994-01-01T23:59:59.000Z

165

Savannah River Remediation Donates $10,000 to South Carolina...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRS Waste Tank Closures Since 1997 A Savannah River Remediation employee uses a manipulator located inside a shielded enclosure at the Defense Waste Processing Facility, where...

166

Savannah River Remediation Donates $10,000 to South Carolina...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commemorate Historic Cleanup Milestone A Savannah River Remediation employee uses a manipulator located inside a shielded enclosure at the Defense Waste Processing Facility, where...

167

Independent Activity Report, Savannah River Remediation - July 2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Remediation - July 2010 Remediation - July 2010 Independent Activity Report, Savannah River Remediation - July 2010 July 2010 Savannah River Operations Office Integrated Safety Management System Phase II Verification Review of Savannah River Remediation The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR), Office of Safety and Quality Assurance (OSQA), Technical Support Division (TSD) Integrated Safety Management System (ISMS), Phase II Verification of Savannah River Remediation (SRR). The purpose of the DOE-SR Phase II ISMS Verification was to verify that the SRR ISMS Description that was submitted to and approved by the DOE-SR Manager is being effectively implemented at the Savannah

168

Biological surveys on the Savannah River in the vicinity of the Savannah River Plant (1951-1976)  

Science Conference Proceedings (OSTI)

In 1951, the Academy of Natural Sciences of Philadelphia was contracted by the Savannah River Plant to initiate a long-term monitoring program in the Savannah River. The purpose of this program was to determine the effect of the Savannah River Plant on the Savannah River aquatic ecosystem. The data from this monitoring program have been computerized by the Savannah River Laboratory, and are summarized in this report. During the period from 1951-1976, 16 major surveys were conducted by the Academy in the Savannah River. Water chemistry analyses were made, and all major biological communities were sampled qualitatively during the spring and fall of each survey year. In addition, quantitative diatom data have been collected quarterly since 1953. Major changes in the Savannah River basin, in the Savannah River Plant's activities, and in the Academy sampling patterns are discussed to provide a historical overview of the biomonitoring program. Appendices include a complete taxonomic listing of species collected from the Savannah River, and summaries of the entire biological and physicochemical data base.

Matthews, R. A.

1982-04-01T23:59:59.000Z

169

Savannah River Site environmental report for 1995  

Science Conference Proceedings (OSTI)

The 1990s have brought dramatic change to the Savannah River Site (SRS) in its role as a key part of the U.S. Department of Energy`s (DOE) weapons complex. Shrinking federal budgets, sharp workforce reductions, the end of the Cold War, and a major shift in mission objectives have combined to severely test the mettle of SRS-South Carolina`s largest employer. But the sprawling 310-square-mile site`s employees have responded to the test in admirable fashion, effectively shifting their emphasis from weapons production to environmental restoration. This report describes the environmental report for the SRS for 1995.

Arnett, M.W.; Mamatey, A. [eds.

1995-12-31T23:59:59.000Z

170

SAVANNAH RIVER SITE ENVIRONMENTAL REPORT FOR 2007  

SciTech Connect

The Savannah River Site Environmental Report for 2007 (WSRC-STI-2008-00057) prepared for the US Department of Energy (DOE) according to requirements of DOE Order 231.1A, 'Environment, Safety and Health Reporting', and DOE Order 5400.5, 'Radiation Protection of the Public and Environment'. The report's purpose is to: (1) present summary environmental data that characterize site environmental management performance; (2) confirm compliance with environmental standards and requirements; (3) highlight significant programs and efforts; (4) assess the impact of SRS operations on the public and the environment.

Mamatey, A

2008-08-27T23:59:59.000Z

171

Savannah River Site environmental report for 1991  

SciTech Connect

This report describes environmental activities conducted on and in the vicinity of the Savannah River Site (SRS) in Aiken, S.C., from Jan. 1 to Dec. 31, 1991, with an update on compliance activities through April 1, 1992. The report is a single volume with a separate summary pamphlet highlighting the major findings for 1991. The report is divided into an executive summary and 14 chapters containing information on environmental compliance issues, environmental monitoring methods and programs, and environmental research activities for 1991, as well as historical data from previous years. Analytical results, figures, charts, and data tables relevant to the environmental monitoring program for 1991 at SRS are included.

Arnett, M.W.; Karapatakis, L.K.; Mamatey, A.R.; Todd, J.L.

1991-01-01T23:59:59.000Z

172

SAVANNAH RIVER SITE ENVIRONMENTAL REPORT FOR 2005  

SciTech Connect

The ''Savannah River Site Environmental Report for 2005'' (WSRC-TR-2006-00007) is prepared for the U.S. Department of Energy (DOE) according to requirements of DOE Order 231.1A, ''Environment, Safety and Health Reporting'', and DOE Order 5400.5, ''Radiation Protection of the Public and Environment''. The report's purpose is to: present summary environmental data that characterize site environmental management performance; confirm compliance with environmental standards and requirements; highlight significant programs and efforts; and assess the impact of SRS operations on the public and the environment.

Mamatey, A

2006-07-18T23:59:59.000Z

173

SAVANNAH RIVER SITE ENVIRONMENTAL REPORT FOR 2007  

SciTech Connect

The Savannah River Site Environmental Report for 2007 (WSRC-STI-2008-00057) prepared for the US Department of Energy (DOE) according to requirements of DOE Order 231.1A, 'Environment, Safety and Health Reporting', and DOE Order 5400.5, 'Radiation Protection of the Public and Environment'. The report's purpose is to: (1) present summary environmental data that characterize site environmental management performance; (2) confirm compliance with environmental standards and requirements; (3) highlight significant programs and efforts; (4) assess the impact of SRS operations on the public and the environment.

Mamatey, A

2008-08-27T23:59:59.000Z

174

Savannah River Site Environmental Report for 2004  

SciTech Connect

The Savannah River Site Environmental Report for 2004 (WSRC-TR-2005-00005) is prepared for the U.S. Department of Energy (DOE) according to requirements of DOE Order 231.1A, ''Environment, Safety and Health Reporting,'' and DOE Order 5400.5, ''Radiation Protection of the Public and Environment''. The report's purpose is to present summary environmental data that characterize site environmental management performance; confirm compliance with environmental standards and requirements; highlight significant programs and efforts; and assess the impact of SRS operations on the public and the environment.

Mamatey, Albert R.

2005-06-07T23:59:59.000Z

175

SAVANNAH RIVER ENVIRONMENTAL REPORT FOR 2006  

SciTech Connect

The ''Savannah River Site Environmental Report for 2006'' (WSRC-TR-2007-00008) is prepared for the U.S. Department of Energy (DOE) according to requirements of DOE Order 231.1A, ''Environment, Safety and Health Reporting'', and DOE Order 5400.5, ''Radiation Protection of the Public and Environment''. The report's purpose is to: present summary environmental data that characterize site environmental management performance; confirm compliance with environmental standards and requirements; highlight significant programs and efforts; and assess the impact of SRS operations on the public and the environment.

Mamatey, A

2007-08-22T23:59:59.000Z

176

U. S. Department of Energy Savannah River Operations Office ...  

NLE Websites -- All DOE Office Websites (Extended Search)

River Operations Office Mission Welcome to the Savannah River Operations Office (DOE-SR) website. DOE-SR is a U.S. Department of Energy (DOE) organization that serves as...

177

Energy Department Awards $295,000 Grant to Savannah River Regional...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

295,000 Grant to Savannah River Regional Diversification Initiative Energy Department Awards 295,000 Grant to Savannah River Regional Diversification Initiative Energy Department...

178

Department of Energy Awards $300,000 to Savannah River Regional...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Regional Diversification Initiative Department of Energy Awards 300,000 to Savannah River Regional Diversification Initiative Department of Energy Awards 300,000...

179

Savannah River Technology Center Quarterly Report - July, Aug., and Sept., 1997  

SciTech Connect

This monthly report summarizes programs and accomplishments of the Savannah River Technology Center in support of activities at the Savannah River Site.

Ferrell, J.M.

1998-10-16T23:59:59.000Z

180

RECOVERY OF DEGRADED HEAVY WATER AT THE SAVANNAH RIVER PLANT  

SciTech Connect

Information is presented on purification and reconcentration of heavy water at the Savannah River Plant. Process and equipment descriptions, typical operating costs, procedures for control of health hazards, standard analytical methods, and specifications for receipt of degraded heavy water for recovery at the Savannah River Plant are included. (auth)

Scotten, W.C.

1960-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Savannah River site environmental report for 1996  

Science Conference Proceedings (OSTI)

The mission at the Savannah River Site (SRS) has changed from the production of nuclear weapons materials for national defense to the management of site-generated waste, restoration of the surrounding environment, and the development of industry in and around the site. However, SRS-through its prime operating contractor, Westinghouse Savannah River Company (WSRC)-continues to maintain a comprehensive environmental monitoring program. In 1996, effluent monitoring and environmental surveillance were conducted within a 31,000-square-mile area in and around SRS that includes neighboring cities, towns, and counties in Georgia and South Carolina and extends up to 100 miles from the site. Though the environmental monitoring program was streamlined in 1996-to improve its cost-effectiveness without compromising data quality or reducing its overall ability to produce critical information-thousands of samples of air, surface water, groundwater, food products, drinking water, wildlife, rainwater, soil, sediment, and vegetation were collected and analyzed for radioactive and nonradioactive contaminants.

Arnett, M.; Mamatey, A. [eds.

1998-12-31T23:59:59.000Z

182

Savannah River Site new NIM design  

SciTech Connect

The Savannah River Laboratory (SRL) is developing a replacement Nuclear Incident Monitor (NIM) system. A prototype system has been built for human factors study and for operations testing. The design of the new NIM is based on the existing NIM system, developed at SRL, which has been in operation at the Savannah River Site since 1979. Many of the components of this system have remained unchanged, or with only minimal changes. The design of the new NIM system takes advantage of the extensive maintenance and operation records that have been accumulated on the existing NIM system. These records identified those components of the system that had performed satisfactorily over the years. Most importantly, the records pinpointed the problem areas in the system. Components were that required replacement, and circuitry that required redesign to ensure that the NIM system meets all of the site criteria for safety, accuracy and maintainability were identified. Mechanical changes were made to assure that the new system conforms to all seismic requirements specified in pertinent standards. 7 figs.

Smoak, A.E.

1990-01-01T23:59:59.000Z

183

Savannah River Site environmental report for 1993  

Science Conference Proceedings (OSTI)

Savannah River Site (SRS) conducts effluent monitoring and environmental surveillance to ensure the safety of the public and the well-being of the environment. DOE Order 5400,1, ``General Environmental Protection Program,`` requires the submission of an environmental report that documents the impact of facility operations on the environment and on public health. SRS has had an extensive environmental surveillance program in place since 1951 (before site startup). At that time, data generated by the on-site surveillance program were reported in site documents. Beginning in 1959, data from off-site environmental monitoring activities were presented in reports issued for public dissemination. Separate reporting of SRS`s on- and off-site environmental monitoring activities continued until 1985, when data from both surveillance programs were merged into a single public document. The Savannah River Site Environmental Report for 1993 is an overview of effluent monitoring and environmental surveillance activities conducted on and in the vicinity of SRS from January 1 through December 31, 1993. For complete program descriptions, consult the ``SRS Environmental Monitoring Plan`` (WSRC-3Ql-2-1000). It documents the rationale and design criteria for the monitoring program, the frequency of monitoring and analysis, the specific analytical and sampling procedures, and the quality assurance requirements.

Arnett, M.W.; Karapatakis, L.K.; Mamatey, A.R. [eds.

1994-08-01T23:59:59.000Z

184

Independent Oversight Activity Report, Savannah River Site Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Activity Report, Savannah River Site Waste Independent Oversight Activity Report, Savannah River Site Waste Solidification Building Independent Oversight Activity Report, Savannah River Site Waste Solidification Building May 2013 Savannah River Site Waste Solidification Building Corrective Actions from the January 2013 Report on Construction Quality of Mechanical Systems Installation and Fire Protection Design [HIAR SRS-2013-5-07] Activity Description/Purpose: Review the corrective actions being implemented by the construction contractor to address Findings 1-4, 6, and 9 from a construction quality review performed by the Office of Health, Safety and Security (HSS) (Reference 1). Meet with the SRS WSB project staff and Savannah River Nuclear Solutions (SRNS) engineers to discuss the proposed corrective actions

185

Two Savannah River Site Projects Gain National Recognition | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Projects Gain National Recognition Savannah River Site Projects Gain National Recognition Two Savannah River Site Projects Gain National Recognition June 21, 2011 - 12:00pm Addthis Media Contacts Jim Giusti, DOE (803) 952-7697 james-r.giusti@srs.gov Will Callicott, SRNL (803) 725-3786 will.callicott@srs.gov AIKEN, SC - The Department of Energy's Savannah River Site has received Environmental Sustainability (EStar) awards from DOE for two projects growing out of technology research, development and application at the Savannah River National Laboratory. EStar awards recognize excellence in pollution prevention and sustainable environmental stewardship. They are awarded for projects and programs that reduce environmental impacts, enhance site operations, and reduce costs. One award, for Renewable Technology Development, Deployment and Education

186

Savannah River National Laboratory (SRNL) | Open Energy Information  

Open Energy Info (EERE)

Savannah River National Laboratory (SRNL) Savannah River National Laboratory (SRNL) (Redirected from Savannah River National Laboratory) Jump to: navigation, search Logo: Savannah River National Laboratory Name Savannah River National Laboratory Place Aiken, South Carolina Zip 29808 Coordinates 33.5606°, -81.7194° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":33.5606,"lon":-81.7194,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

187

Independent Oversight Inspection, Savannah River Site, Summary Report -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site, Summary Savannah River Site, Summary Report - February 2004 Independent Oversight Inspection, Savannah River Site, Summary Report - February 2004 February 2004 Inspection of Environment, Safety, and Health Management and Emergency Management at the Savannah River Site The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted an inspection of environment, safety, and health (ES&H) and emergency management programs at the U.S. Department of Energy's (DOE) Savannah River Site (SRS) in January and February 2004. The inspection was performed as a joint effort by the OA Office of Environment, Safety and Health Evaluations and the Office of Emergency Management Oversight. WSRC has implemented an emergency management program at SRS that exhibits

188

Independent Oversight Review, Savannah River Site - September 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site - September 2012 Savannah River Site - September 2012 Independent Oversight Review, Savannah River Site - September 2012 September 2012 Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of construction quality at the U.S. Department of Energy (DOE) Savannah River Site (SRS) Salt Waste Processing Facility (SWPF). The focus of the review, performed on site between May 14 and 18, 2012, was piping and pipe supports. The review team also observed installation of two tanks in the dark cells (DCs). Subsequent to the onsite review, procurement records were reviewed for quality-related piping and piping system components.

189

Preliminary Notice of Violation, Westinghouse Savannah River Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Westinghouse Savannah River Westinghouse Savannah River Company - EA-97-12 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA-97-12 December 5, 1997 Preliminary Notice of Violation issued to Westinghouse Savannah River Company, related to an Unplanned Radioactive Material Intake at the Savannah River Site, (EA-97-12) This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances surrounding an unplanned intake of radioactive material [ ] by a worker that resulted in the worker receiving an occupational whole body dose of [a specifed value] Total Effective Dose Equivalent (TEDE). The intake, which exceeds the regulatory limit of 5 rems, was identified in April 1997 during a review of the worker's routine bioassay sample results. Subsequent investigation by the Westinghouse

190

Independent Oversight Review, Savannah River Site Salt Waste Processing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Salt Waste Savannah River Site Salt Waste Processing Facility - August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development. This report documents the results of an independent oversight review of the safety basis and design development for the Salt Waste Processing Facility (SWPF) at the U.S. Department of Energy (DOE) Savannah River Site. The review was performed February 12-14, 2013 by DOE's Office of Safety and Emergency Management Evaluations, which is within the DOE Office of Health, Safety and Security. The purpose of the review was to evaluate the safety basis, design, and the associated technical documents developed for

191

Independent Oversight Activity Report, Savannah River Site Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Waste Savannah River Site Waste Solidification Building Independent Oversight Activity Report, Savannah River Site Waste Solidification Building May 2013 Savannah River Site Waste Solidification Building Corrective Actions from the January 2013 Report on Construction Quality of Mechanical Systems Installation and Fire Protection Design [HIAR SRS-2013-5-07] Activity Description/Purpose: Review the corrective actions being implemented by the construction contractor to address Findings 1-4, 6, and 9 from a construction quality review performed by the Office of Health, Safety and Security (HSS) (Reference 1). Meet with the SRS WSB project staff and Savannah River Nuclear Solutions (SRNS) engineers to discuss the proposed corrective actions discussed in Reference 2, and clarify additional reviews to be performed by

192

Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-04 2-04 Preliminary Notice of Violation, Savannah River Nuclear Solutions, LLC - WEA-2012-04 November 9, 2012 Issued to Savannah River Nuclear Solutions (SRNS), LLC, related to a Worker Fall from a Scaffold in the K-Area Complex at the Savannah River Site This letter refers to the U.S. Department of Energy (DOE) Office of Health, Safety and Security's Office of Enforcement and Oversight investigation into the facts and circumstances associated with a worker fall from a Tele-Tower® Adjustable Work Platform in the K-Area Complex at the Savannah River Site on July 1, 2011. The results of DOE's investigation were provided to Savannah River Nuclear Solutions, LLC (SRNS) in an investigation report dated May 8, 2012. An enforcement conference was held on June 27, 2012, with you and members of your staff to discuss the

193

Principal Media Contact: DT Townsend Savannah River Nuclear Solutions, LLC  

NLE Websites -- All DOE Office Websites (Extended Search)

NNSA Honors 41 Savannah River Site Employees with Defense NNSA Honors 41 Savannah River Site Employees with Defense Programs Awards of Excellence AIKEN, S.C. (September 20, 2013) - Forty-one Savannah River Nuclear Solutions employ- ees were honored for excellence in support of the National Nuclear Security Administration's Defense Programs. Doug Dearolph, manager of the NNSA Savannah River Field Office presented NNSA Defense Programs Awards of Excellence to one individual and two teams for their "signif- icant achievement in quality, productivity, cost savings, safety, or creativity in support of NNSA's nuclear weapons program." Honorees included Rick Poland of Savannah River National Laboratory, the Tritium Control Room Operator Training Team, and the B83 Alt 353 Implementation Team. Poland was honored for his multi-year work as Director of the Federal Working Group on

194

Independent Oversight Review, Savannah River Site Salt Waste Processing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Salt Waste Savannah River Site Salt Waste Processing Facility - August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development. This report documents the results of an independent oversight review of the safety basis and design development for the Salt Waste Processing Facility (SWPF) at the U.S. Department of Energy (DOE) Savannah River Site. The review was performed February 12-14, 2013 by DOE's Office of Safety and Emergency Management Evaluations, which is within the DOE Office of Health, Safety and Security. The purpose of the review was to evaluate the safety basis, design, and the associated technical documents developed for

195

Savannah River Site Marks Waste Processing Milestone with Melter's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Marks Waste Processing Milestone with Savannah River Site Marks Waste Processing Milestone with Melter's 2,000th Waste Canister Savannah River Site Marks Waste Processing Milestone with Melter's 2,000th Waste Canister February 1, 2012 - 12:00pm Addthis A Savannah River Remediation employee uses a manipulator located inside a shielded enclosure at the Defense Waste Processing Facility, where a melter pours molten glass into a canister. A Savannah River Remediation employee uses a manipulator located inside a shielded enclosure at the Defense Waste Processing Facility, where a melter pours molten glass into a canister. AIKEN, S.C. - The second melter to operate in the 16-year history of the nation's largest radioactive waste glassification plant shows no signs of slowing after recently pouring its 2,000 canister of glass-formed hazardous

196

Independent Oversight Inspection, Savannah River Site - January 2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site - January Savannah River Site - January 2010 Independent Oversight Inspection, Savannah River Site - January 2010 January 2010 Inspection of Emergency Management at the Savannah River Site The U.S. Department of Energy (DOE) Office of Independent Oversight within the Office of Health, Safety and Security (HSS), inspected the emergency management program at the DOE Savannah River Site (SRS) in August and September 2009. The inspection was performed by the Office of Independent Oversight's Office of Emergency Management Oversight to support site management in the execution of the SRS mission. This report discusses the results of the review of the SRS emergency management program. Overall, SRS has implemented a mature, comprehensive, and well-documented emergency management program whose programmatic elements and site emergency

197

Independent Oversight Inspection, Savannah River Site Office - December  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Office - Savannah River Site Office - December 2009 Independent Oversight Inspection, Savannah River Site Office - December 2009 December 2009 Inspection of Nuclear Safety at the Savannah River Site Office and the Tritium Program Facilities The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), conducted an inspection of nuclear safety at several National Nuclear Security Administration (NNSA) facilities located at DOE's Savannah River Site (SRS) during August and September 2009. The inspection was performed by the Office of Independent Oversight's Office of Environment, Safety and Health Evaluations. With some isolated exceptions, the current SRNS nuclear safety programs and processes at the Tritium Program facilities are effective. Facility and

198

Lempke visits Savannah River Site | National Nuclear Security  

National Nuclear Security Administration (NNSA)

visits Savannah River Site | National Nuclear Security visits Savannah River Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Lempke visits Savannah River Site Lempke visits Savannah River Site Posted By Office of Public Affairs NNSA Associate Principal Deputy Administrator Michael Lempke recently visited the Savannah River Site, getting an up-close look at facilities

199

Two Savannah River Site Projects Gain National Recognition | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Two Savannah River Site Projects Gain National Recognition Two Savannah River Site Projects Gain National Recognition Two Savannah River Site Projects Gain National Recognition June 21, 2011 - 12:00pm Addthis Media Contacts Jim Giusti, DOE (803) 952-7697 james-r.giusti@srs.gov Will Callicott, SRNL (803) 725-3786 will.callicott@srs.gov AIKEN, SC - The Department of Energy's Savannah River Site has received Environmental Sustainability (EStar) awards from DOE for two projects growing out of technology research, development and application at the Savannah River National Laboratory. EStar awards recognize excellence in pollution prevention and sustainable environmental stewardship. They are awarded for projects and programs that reduce environmental impacts, enhance site operations, and reduce costs. One award, for Renewable Technology Development, Deployment and Education

200

Savannah River Site Removes Dome, Opening Reactor for Recovery Act  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Removes Dome, Opening Reactor for Recovery Act Savannah River Site Removes Dome, Opening Reactor for Recovery Act Decommissioning Savannah River Site Removes Dome, Opening Reactor for Recovery Act Decommissioning American Recovery and Reinvestment Act workers achieved a significant milestone in the decommissioning of a Cold War reactor at the Savannah River Site this month after they safely removed its rusty, orange, 75-foot-tall dome. With the help of a 660-ton crane and lifting lugs, the workers pulled the 174,000-pound dome off the Heavy Water Components Test Reactor, capping more than 16 months of preparations. Savannah River Site Removes Dome, Opening Reactor for Recovery Act Decommissioning More Documents & Publications Recovery Act Changes Hanford Skyline with Explosive Demolitions Recovery Act Workers Add Time Capsule Before Sealing Reactor for Hundreds

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Independent Oversight Inspection, Savannah River Site - February 2006 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site - February Savannah River Site - February 2006 Independent Oversight Inspection, Savannah River Site - February 2006 February 2006 Inspection of Emergency Management at the Savannah River Site The U.S. Department of Energy (DOE) Office of Independent Oversight conducted an inspection of environment, safety, and health and emergency management programs at the DOE Savannah River Site (SRS) in January and February 2006. The inspection was performed as a joint effort by Independent Oversight's Office of Environment, Safety and Health Evaluations and Office of Emergency Management Oversight. This 2006 Independent Oversight inspection found that nearly all of the WSRC weaknesses from the 2004 inspection have been addressed. Actions included implementing a comprehensive hazardous material screening process,

202

Savannah River Nuclear Solutions awards family scholarships | National  

National Nuclear Security Administration (NNSA)

Savannah River Nuclear Solutions awards family scholarships | National Savannah River Nuclear Solutions awards family scholarships | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Savannah River Nuclear Solutions awards family scholarships Savannah River Nuclear Solutions awards family scholarships Posted By Office of Public Affairs Savannah River Nuclear Solutions awards family scholarships

203

Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site, January 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site May 2011 January 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................... 1 2.0 Background ............................................................................................................................................ 1 3.0 Scope ...................................................................................................................................................... 2

204

Categorical Exclusion Determinations: Savannah River Operations Office |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 14, 2011 September 14, 2011 CX-006968: Categorical Exclusion Determination Sampling Cooling Tower Water at Savannah River Site and Performing and Analysis for Legionella Pneumophila Density CX(s) Applied: B3.1 Date: 09/14/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, National Energy Technology Laboratory September 14, 2011 CX-006987: Categorical Exclusion Determination Reconfigure and Standardize Piping to Floor Drain in Pump Pit 281-9H CX(s) Applied: B1.3 Date: 09/14/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management, National Energy Technology Laboratory September 14, 2011 CX-006970: Categorical Exclusion Determination Replace Wooden Poles Around K Area CX(s) Applied: B1.3 Date: 09/14/2011 Location(s): Aiken, South Carolina

205

SAVANNAH RIVER SITE ENVIRONMENTAL REPORT FOR 2008  

Science Conference Proceedings (OSTI)

The Savannah River Site Environmental Report for 2008 (SRNS-STI-2009-00190) is prepared for the U.S. Department of Energy (DOE) according to requirements of DOE Order 231.1A, 'Environment, Safety and Health Reporting,' and DOE Order 5400.5, 'Radiation Protection of the Public and Environment.' The annual SRS Environmental Report has been produced for more than 50 years. Several hundred copies are distributed each year to government officials, universities, public libraries, environmental and civic groups, news media, and interested individuals. The report's purpose is to: (1) present summary environmental data that characterize site environmental management performance; (2) confirm compliance with environmental standards and requirements; and (3) highlight significant programs and efforts.

Mamatey, A.

2009-09-15T23:59:59.000Z

206

Savannah River Site environmental report for 1989  

SciTech Connect

The purpose of this report is to meet three of the primary objectives of the Savannah River Site (SRS) environmental monitoring program. These objectives are to assess actual or potential exposures to populations form the presence of radioactive and nonradioactive materials from normal operations or nonroutine occurrences; to demonstrate compliance with applicable authorized limits and legal requirements; and to communicate results of the monitoring program to the public. This 1989 report contains descriptions of radiological and nonradiological monitoring programs, it provides data obtained from these programs, and it describes various environmental research activities ongoing at the site. Also included are summaries of environmental management and compliance activities, a summary of National Environmental Policy Act activities, and a listing of environmental permits issued by regulatory agencies.

Cummins, C.L.; Martin, D.K.; Todd, J.L.

1989-01-01T23:59:59.000Z

207

SAVANNAH RIVER ENVIRONMENTAL REPORT FOR 2006  

SciTech Connect

The ''Savannah River Site Environmental Report for 2006'' (WSRC-TR-2007-00008) is prepared for the U.S. Department of Energy (DOE) according to requirements of DOE Order 231.1A, ''Environment, Safety and Health Reporting'', and DOE Order 5400.5, ''Radiation Protection of the Public and Environment''. The report's purpose is to: present summary environmental data that characterize site environmental management performance; confirm compliance with environmental standards and requirements; highlight significant programs and efforts; and assess the impact of SRS operations on the public and the environment.

Mamatey, A

2007-08-22T23:59:59.000Z

208

Savannah River Site Environmental Report for 1994  

Science Conference Proceedings (OSTI)

The mission at the Savannah River Site has changed from producing nuclear weapons materials for national defense to managing the waste it has generated, restoring the environment, and enhancing industrial development in and around the site. But no matter what the site`s mission is, it will continue to maintain its comprehensive environmental monitoring and surveillance program. In 1994, effluent monitoring and environmental surveillance were conducted within a 30,000-square-mile area in and around SRS that includes neighboring cities, towns, and counties in Georgia and South Carolina and extends up to 100 miles from the site. Thousands of samples of air, surface water, groundwater, foodstuffs, drinking water, wildlife, rainwater, soil, sediment, and vegetation were collected and analyzed for radioactive and nonradioactive contaminants.

Arnett, M.W.; Mamatey, A.; Spitzer, D.

1994-12-16T23:59:59.000Z

209

Savannah River Site Environmental Implementation Plan  

SciTech Connect

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

1989-08-01T23:59:59.000Z

210

Savannah River Site environmental implementation plan  

SciTech Connect

Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

1989-08-01T23:59:59.000Z

211

The Savannah River Site's Groundwater Monitoring Program  

Science Conference Proceedings (OSTI)

This report summarizes the Savannah River Site (SRS) groundwater monitoring program conducted in the first quarter of 1990. It includes the analytical data, field data, well activity data, and the other documentation for this program and provides a record of the program's activities and rationale and an official document of the analytical results. The groundwater monitoring program includes the following activities: installation, maintenance, and abandonment of monitoring wells, environmental soil borings, development of the sampling and analytical schedule, collection and analyses of groundwater samples, review of the analytical data and other data, maintenance of the databases containing groundwater monitoring data and related data, quality assurance (QA) evaluations of laboratory performance, and reports of results to waste-site facility custodians and to the Environmental Protection Section (EPS) of EPD.

Not Available

1990-10-18T23:59:59.000Z

212

SAVANNAH RIVER SITE ENVIRONMENTAL REPORT FOR 2010  

SciTech Connect

This report was prepared in accordance with U.S. Department of Energy (DOE) Order 231.1A, 'Environment, Safety and Health Reporting,' to present summary environmental data for the purpose of: (a) characterizing site's environmental management performance; (b) summarizing environmental occurrences and responses reported during the calendar year; (c) describing compliance status with respect to environmental standards and requirements; and (d) highlighting significant site programs and efforts. This report is the principal document that demonstrates compliance with the requirements of DOE Order 5400.5, 'Radiation Protection of the Public and the Environment,' and is a key component of DOE's effort to keep the public informed of environmental conditions at Savannah River Site (SRS). SRS has four primary missions: (1) Environmental Management - Cleaning up the legacy of the Cold War efforts and preparing decommissioned facilities and areas for long-term stewardship; (2) Nuclear Weapons Stockpile Support - Meeting the needs of the U.S. nuclear weapons stockpile through the tritium programs of the National Nuclear Security Administration (NNSA); (3) Nuclear Nonproliferation Support - Meeting the needs of the NNSA's nuclear nonproliferation programs by safely storing and dispositioning excess special nuclear materials; and (4) Research and Development - Supporting the application of science by the Savannah River National Laboratory (SRNL) to meet the needs of SRS, the DOE complex, and other federal agencies During 2010, SRS worked to fulfill these missions and position the site for future operations. SRS continued to work with the South Carolina Department of Health and Environmental Control (SCDHEC), the Environmental Protection Agency (EPA), and the Nuclear Regulatory Commission to find and implement solutions and schedules for waste management and disposition. As part of its mission to clean up the Cold War legacy, SRS will continue to address the highest-risk waste management issues by safely storing and preparing liquid waste and nuclear materials for disposition, and by safely stabilizing any tank waste residues that remain on site.

Mamatey, A.; Dunaway-Ackerman, J.

2011-08-16T23:59:59.000Z

213

Independent Oversight Review, Savannah River Site Tritium Facilities -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tritium Tritium Facilities - December 2012 Independent Oversight Review, Savannah River Site Tritium Facilities - December 2012 December 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Savannah River Site Tritium Facilities The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of preparedness for severe natural phenomena events (NPEs) at the National Nuclear Security Administration (NNSA) Savannah River Site's (SRS's) Tritium Facilities (TF). The HSS Office of Safety and Emergency Management Evaluations performed this review to evaluate the processes for identifying emergency response capabilities and maintaining them in a state of readiness in case of a severe NPE.

214

Independent Activity Report, Savannah River Site - September 2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 2010 September 2010 Independent Activity Report, Savannah River Site - September 2010 Savannah River Site Salt Waste Processing Facility Effectiveness Review The U.S. Department of Energy (DOE), Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the DOE Savannah River Operations Office (DOE-SR), Salt Waste Processing Facility Project Office (SWPFPO), Salt Waste Processing Facility (SWPF) Integrated Safety Management System (ISMS) Effectiveness Review. The HSS participation, through its Site Lead program, provided HSS with an opportunity to maintain operational awareness and evaluate site programs, while supporting DOE line management efforts to safely and securely accomplish their missions. The onsite review was conducted during the

215

Independent Oversight Review, Savannah River Site - July 2011 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2011 July 2011 Independent Oversight Review, Savannah River Site - July 2011 July 2011 Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project The Office of Safety and Emergency Management Evaluations, within the Office of Health, Safety and Security (HSS), conducted an independent review of selected engineering processes for the Waste Solidification Building (WSB) safety significant electrical system at the Savannah River Site (SRS). The purpose of this review was to assess the adequacy of the contractor's electrical system configuration management and design change control during construction and initial system turnover activities. Interviews and reviewed WSB Project Electrical System DCFs, an SDDR, and

216

Independent Oversight Review, Savannah River Site - September 2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Independent Oversight Review, Savannah River Site - September 2011 September 2011 Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities The Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS), conducted an independent review of the Implementation Verification Review (IVR) Processes at Savannah River Site Environmental Management Nuclear Facilities. The overall objective of the Independent Oversight IVR review process includes verification that contractors and site offices have developed and implemented appropriate methods for performing IVRs (including direction for scheduling and conducting IVR activities) and measurement of the

217

Independent Oversight Inspection, Savannah River Site - February 2006 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February February 2006 Independent Oversight Inspection, Savannah River Site - February 2006 February 2006 Inspection of Emergency Management at the Savannah River Site The U.S. Department of Energy (DOE) Office of Independent Oversight conducted an inspection of environment, safety, and health and emergency management programs at the DOE Savannah River Site (SRS) in January and February 2006. The inspection was performed as a joint effort by Independent Oversight's Office of Environment, Safety and Health Evaluations and Office of Emergency Management Oversight. This 2006 Independent Oversight inspection found that nearly all of the WSRC weaknesses from the 2004 inspection have been addressed. Actions included implementing a comprehensive hazardous material screening process,

218

Tank Farms at the Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tank Farms at the Savannah River Site Tank Farms at the Savannah River Site Tank Farms at the Savannah River Site Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 authorizes the Secretary of Energy, in consultation with the Nuclear Regulatory Commission, to reclassify certain waste from reprocessing spent nuclear fuel from high-level waste to low-level waste if it meets the criteria set forth in Section 3116. A Waste Determination Basis (WD Basis) provides the analysis to document the Secretary's determination to manage the residuals as low-level radioactive waste. The Savannah River Site has several facilities managed under Section 3116. The F-Area Tank Farm (FTF) WD Basis covers 20 tanks remaining to be closed in the FTF and the H-Area Tank Farm (HTF) WD Basis will cover all 29 HTF

219

Microsoft Word - GrantSavannahRiver20020828.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

200,000 Grant to the Savannah River 200,000 Grant to the Savannah River Regional Diversification Initiative Community Reuse Organization WASHINGTON, D.C. - The Department of Energy has awarded $200,000 in the form of a competitive grant to the Savannah River Regional Diversification Initiative (SRRDI). SRRDI is the community reuse organization (CRO) for the Department's Savannah River Site. The SRRDI applied for funding from the Department's Office of Worker and Community Transition in the form of a competitive grant. Each CRO can apply for funds under the Small Capital Program (small cap) up to $200,000 and/or the Large Capital Program (large cap) up to one million dollars. "The Energy Department is a good neighbor to the communities surrounding our sites," Secretary of Energy Spencer Abraham said. "We will continue to work with SRDDI and other

220

DOE Issues Salt Waste Determination for the Savannah River Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issues Salt Waste Determination for the Savannah River Site Issues Salt Waste Determination for the Savannah River Site DOE Issues Salt Waste Determination for the Savannah River Site January 18, 2006 - 10:49am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued the waste determination for the treatment and stabilization of low activity salt-waste at the Savannah River Site allowing for significant reductions in environmental and health risks posed by the material. Stored in forty-nine underground tanks, approximately 36 million gallons of radioactive waste is left over from plutonium production during the Cold War. In addition, the department issued an amended Record of Decision and Implementation Plan to the Defense Nuclear Facilities Safety Board. "Today's announcement clears the way for the removal and treatment of this

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Savannah River Site Contractor Receives Project Management Institute Award  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Receives Project Management Contractor Receives Project Management Institute Award Savannah River Site Contractor Receives Project Management Institute Award November 15, 2011 - 12:00pm Addthis SRR Bubbler Project Manager Bill Pepper, center, accepts the PMI Project of the Year award from Eloy Saldivar, left, president of the Savannah River Chapter of PMI. DWPF Facility Manager Les Sonnenberg is on the right. SRR Bubbler Project Manager Bill Pepper, center, accepts the PMI Project of the Year award from Eloy Saldivar, left, president of the Savannah River Chapter of PMI. DWPF Facility Manager Les Sonnenberg is on the right. AIKEN, S.C. - The local chapter of the Project Management Institute (PMI) recently honored the Savannah River Site liquid waste contractor with its 2011 Project of the Year award.

222

FY 2007 Washington Savannah River Company, LLC, PER Summary | National  

National Nuclear Security Administration (NNSA)

7 Washington Savannah River Company, LLC, PER Summary | National 7 Washington Savannah River Company, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2007 Washington Savannah River Company, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2007 Washington Savannah River Company, LLC,

223

FY 2012 Savannah River Nuclear Solutions, LLC, PER Summary | National  

National Nuclear Security Administration (NNSA)

Savannah River Nuclear Solutions, LLC, PER Summary | National Savannah River Nuclear Solutions, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2012 Savannah River Nuclear Solutions, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2012 Savannah River Nuclear Solutions, LLC,

224

Savannah River Site Celebrates Historic Closure of Radioactive Waste Tanks:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Celebrates Historic Closure of Radioactive Savannah River Site Celebrates Historic Closure of Radioactive Waste Tanks: Senior DOE Officials and South Carolina Congressional Leadership Gather to Commemorate Historic Cleanup Milestone Savannah River Site Celebrates Historic Closure of Radioactive Waste Tanks: Senior DOE Officials and South Carolina Congressional Leadership Gather to Commemorate Historic Cleanup Milestone October 1, 2012 - 12:00pm Addthis U.S. Energy Under Secretary for Nuclear Security Thomas D'Agostino, left, South Carolina Department of Health and Environmental Control Director Catherine Templeton and U.S. Sen. Lindsey Graham (R-SC) unveil a marker to commemorate the closing of waste tanks at the Savannah River Site in South Carolina. U.S. Energy Under Secretary for Nuclear Security Thomas D'Agostino, left,

225

A Supplement Analysis on Plutonium Consolidation at Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE))

DOE’s April 2002 decision to consolidate surplus, non-pit weapons-usable plutonium at Savannah River Site did not affect a 1997 DOE decision to continue storage of non-pit surplus plutonium at...

226

Savannah River Site Celebrates Historic Closure of Radioactive Waste Tanks:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Celebrates Historic Closure of Radioactive Savannah River Site Celebrates Historic Closure of Radioactive Waste Tanks: Senior DOE Officials and South Carolina Congressional Leadership Gather to Commemorate Historic Cleanup Milestone Savannah River Site Celebrates Historic Closure of Radioactive Waste Tanks: Senior DOE Officials and South Carolina Congressional Leadership Gather to Commemorate Historic Cleanup Milestone October 1, 2012 - 12:00pm Addthis U.S. Energy Under Secretary for Nuclear Security Thomas D'Agostino, left, South Carolina Department of Health and Environmental Control Director Catherine Templeton and U.S. Sen. Lindsey Graham (R-SC) unveil a marker to commemorate the closing of waste tanks at the Savannah River Site in South Carolina. U.S. Energy Under Secretary for Nuclear Security Thomas D'Agostino, left,

227

DOE Statement on Savannah River Site Vitrified Waste Concentrations |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement on Savannah River Site Vitrified Waste Concentrations Statement on Savannah River Site Vitrified Waste Concentrations DOE Statement on Savannah River Site Vitrified Waste Concentrations April 30, 2010 - 12:30pm Addthis "The Office of Environmental Management has decided not to move forward at this time with its February decision to direct contractors to start planning for higher concentrations of plutonium in waste canisters at the Savannah River Site. While this may ultimately be a better way to manage and minimize the volume of waste, the Department wants to further review the issues involved before proceeding. No canisters have been filled at the higher concentration level." Addthis Related Articles Energy Secretary Chu Announces $6 Billion in Recovery Act Funding for Environmental Cleanup Department of Energy Projects Win 36 R&D 100 Awards for 2011

228

Savannah River Site Contractor Achieves Tank Waste Milestone | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contractor Achieves Tank Waste Milestone Contractor Achieves Tank Waste Milestone Savannah River Site Contractor Achieves Tank Waste Milestone February 2, 2012 - 12:00pm Addthis Pictured here is a component of the Interim Salt Disposition Process — known as Modular Caustic Side Solvent Extraction Unit (MCU) — that helped Savannah River Remediation process more than 500,000 gallons of salt waste since October last year, a contract milestone. Pictured here is a component of the Interim Salt Disposition Process - known as Modular Caustic Side Solvent Extraction Unit (MCU) - that helped Savannah River Remediation process more than 500,000 gallons of salt waste since October last year, a contract milestone. AIKEN, S.C. - The Savannah River Site's liquid waste contractor recently achieved a contract milestone by processing 500,000 gallons of

229

FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary | National  

National Nuclear Security Administration (NNSA)

Savannah River Nuclear Solutions, LLC, PER Summary | National Savannah River Nuclear Solutions, LLC, PER Summary | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary Home > About Us > Our Operations > Acquisition and Project Management > Performance Evaluations > FY 2010 Savannah River Nuclear Solutions, LLC,

230

Independent Oversight Review, Savannah River Site - August 2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 2011 August 2011 Independent Oversight Review, Savannah River Site - August 2011 August 2011 Review of Commercial Grade Dedication Plans for the Safety Instrumented System at the Savannah River Site Waste Solidification Building Project The Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS), conducted an independent review of selected aspects of Savannah River Nuclear Solutions' (SRNS) plans for commercial grade dedication (CGD) of the Waste Solidification Building (WSB) Safety Instrumented System (SIS) safety significant components at the Savannah River Site (SRS). The independent review was conducted during June 14-24 and July 12-13, 2011, by Independent Oversight in coordination with the U.S. Department of Energy and the National Nuclear

231

Microsoft Word - SavannahRiverAward20030701.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2003 , 2003 Energy Department Awards $295,000 Grant to Savannah River Regional Diversification Initiative WASHINGTON, DC - The Department of Energy (DOE) today announced that it will award $295,000 to the Savannah River Regional Diversification Initiative (SRRDI), to establish a positive economic development environment that includes job creation, job retention, and entrepreneurial development in high-tech and manufacturing businesses. SRRDI is the community reuse organization (CRO) for the department's Savannah River Site. "The Energy Department is a good neighbor to the communities surrounding our sites," Secretary of Energy Spencer Abraham said. "We will continue to work with the Savannah River Regional Diversification Initiative and other community reuse organizations around the country,

232

Preliminary Notice of Violation, Westinghouse Savannah River Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA-2000-02 March 6, 2000 Preliminary Notice of Violation issued to Westinghouse Savannah River Company, related to Procurement Quality Assurance and Quality Improvement Deficiencies at the Savannah River Site. This letter refers to the Department of Energy's (DOE) evaluation of quality assurance deficiencies with the procurement of items for use at nuclear facilities under your control. DOE conducted an investigation and issued an Investigation Summary Report on December 21, 1999, detailing its findings. An Enforcement Conference was held with management of the Westinghouse Savannah River Company (WSRC) to discuss these matters on January 11, 2000. The Enforcement Conference Summary Report is enclosed.

233

Accident Investigation of the Fall Injury at the Savannah River...  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S. Department of Energy Office of Environmental Management Accident Investigation Report Fall Injury Accident at the Savannah River Site on July 1, 2011 August 8, 2011 Disclaimer...

234

Summary - Disposal Practices at the Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ETR-19 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Disposal Practices at the Savannah River Site Why DOE-EM Did...

235

U. S. Department of Energy Savannah River Operations Office ...  

NLE Websites -- All DOE Office Websites (Extended Search)

Moody Dr. David C. Moody Manager U. S. Department of Energy Savannah River Operations Office Dr. David C. Moody Dr. Moody is the Manager of the U.S. Department of Energy (DOE)...

236

U. S. Department of Energy Savannah River Operations Office ...  

NLE Websites -- All DOE Office Websites (Extended Search)

T. Zack Smith Deputy Manager U. S. Department of Energy Savannah River Operations Office T. Zack Smith Mr. Smith is the Deputy Manager for the U. S. Department of Energy...

237

Independent Activity Report, Savannah River Site - July 2011 | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Activity Report, Savannah River Site - July 2011 Independent Activity Report, Savannah River Site - July 2011 Independent Activity Report, Savannah River Site - July 2011 July 2011 Savannah River Site Waste Solidification Building Project Peer Review [HIAR-SRS-2011-07-15] At the request of the National Nuclear Security Administration (NNSA) Office of Enterprise Project Management (NAAPM-20), the Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), provided an expert to review the Waste Solidification Building (WSB) startup programs and procedures associated with worker safety and health, environment, and security. Criteria for the review was detailed in the Criteria, Review and Approach Document (CRAD) contained within the NNSA review plan, and the expert served as a member of

238

2010 Annual Planning Summary for Savannah River Operations Office...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to be prepared in the next 24 months, and the planned cost and schedule for each NEPA review identified. 2010 Annual Planning Summary for Savannah River Operations Office (SRS)...

239

Young Professionals in Nuclear Industry Group Forms at Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Young Professionals in Nuclear Industry Group Forms at Savannah Young Professionals in Nuclear Industry Group Forms at Savannah River Site Young Professionals in Nuclear Industry Group Forms at Savannah River Site January 1, 2012 - 12:00pm Addthis The Savannah River Chapter of North American – Young Generation in Nuclear is a new group forming at the Savannah River Site. The Savannah River Chapter of North American - Young Generation in Nuclear is a new group forming at the Savannah River Site. AIKEN, S.C. - Supporting the development of young nuclear professionals in the Central Savannah River Area (CSRA) is the purpose behind a new group forming at the Savannah River Site (SRS). The Savannah River Chapter of North American - Young Generation in Nuclear (SR-YGN) will hold a kick-off meeting Jan. 26 in Aiken and all

240

SAVANNAH RIVER NATIONAL LABORATORY HYDROGEN TECHNOLOGY RESEARCH  

DOE Green Energy (OSTI)

The Savannah River National Laboratory (SRNL) is a U.S. Department of Energy research and development laboratory located at the Savannah River Site (SRS) near Aiken, South Carolina. SRNL has over 50 years of experience in developing and applying hydrogen technology, both through its national defense activities as well as through its recent activities with the DOE Hydrogen Programs. The hydrogen technical staff at SRNL comprises over 90 scientists, engineers and technologists, and it is believed to be the largest such staff in the U.S. SRNL has ongoing R&D initiatives in a variety of hydrogen storage areas, including metal hydrides, complex hydrides, chemical hydrides and carbon nanotubes. SRNL has over 25 years of experience in metal hydrides and solid-state hydrogen storage research, development and demonstration. As part of its defense mission at SRS, SRNL developed, designed, demonstrated and provides ongoing technical support for the largest hydrogen processing facility in the world based on the integrated use of metal hydrides for hydrogen storage, separation, and compression. The SRNL has been active in teaming with academic and industrial partners to advance hydrogen technology. A primary focus of SRNL's R&D has been hydrogen storage using metal and complex hydrides. SRNL and its Hydrogen Technology Research Laboratory have been very successful in leveraging their defense infrastructure, capabilities and investments to help solve this country's energy problems. SRNL has participated in projects to convert public transit and utility vehicles for operation using hydrogen fuel. Two major projects include the H2Fuel Bus and an Industrial Fuel Cell Vehicle (IFCV) also known as the GATOR{trademark}. Both of these projects were funded by DOE and cost shared by industry. These are discussed further in Section 3.0, Demonstration Projects. In addition to metal hydrides technology, the SRNL Hydrogen group has done extensive R&D in other hydrogen technologies, including membrane filters for H2 separation, doped carbon nanotubes, storage vessel design and optimization, chemical hydrides, hydrogen compressors and hydrogen production using nuclear energy. Several of these are discussed further in Section 2, SRNL Hydrogen Research and Development.

Danko, E

2008-02-08T23:59:59.000Z

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

ROUGHNESS LENGTHS FOR THE SAVANNAH RIVER SITE  

SciTech Connect

Surface roughness values for the areas surrounding the H, D and N-Area meteorological towers were computed from archived 2010 meteorological data. These 15-minute-averaged data were measured with cup anemometers and bidirectional wind vanes (bivanes) 61 m above the surface. The results of the roughness calculation using the standard deviation of elevation angle {sigma}{sub E}, and applying the simple formula based on tree canopy height, gave consistent estimates for roughness around the H-Area tower in the range of 1.76 to 1.86 m (95% confidence interval) with a mean value of 1.81 m. Application of the {sigma}{sub E} method for the 61-m level at D and N-Areas gave mean values of 1.71 and 1.81 with confidence ranges of 1.62-1.81 and 1.73-1.88 meters, respectively. Roughness results are azimuth dependent, and thus are presented as averages over compass sectors spanning 22.5 degrees. Calculated values were compared to other methods of determining roughness, including the standard deviation of the azimuth direction, {sigma}{sub A}, and standard deviation of the wind speed, {sigma}{sub U}. Additional data was obtained from a sonic anemometer at 61-m on the H-Area tower during a period of a few weeks in 2010. Results from the sonic anemometer support our use of {sigma}{sub E} to calculate roughness. Based on the H-Area tower results, a surface roughness of 1.8 m using is recommended for use in dispersion modeling applications that consider the impacts of a contaminant release to individuals along the Site boundary. The canopy surrounding the H-Area tower is relatively uniform (i.e., little variance in roughness by upwind direction), and data supplied by the U.S. Forest Service at Savannah River show that the canopy height and composition surrounding the H-Area tower is reasonably representative of forested areas throughout the SRS reservation. For dispersion modeling analyses requiring assessments of a co-located worker within the respective operations area, recommended area-specific values range from 0.3 m for E Area to 0.7 m for A Area at the Savannah River National Laboratory. These area-specific values, summarized in Table 4-1, were determined using the Environmental Protection Agency's AERSURFACE computer algorithm.

Hunter, C.

2012-03-28T23:59:59.000Z

242

Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site, IG-0377  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IG-1 IG-1 INFORMATION: Report on "Inspection of Westinghouse Savannah River Company Fees for Managing and Operating the Savannah River Site" The Secretary BACKGROUND: During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department's annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth

243

EA-1606: Proposed Use of Savannah River Site Lands for Military...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Assessment Proposed Use of Savannah River Site Lands for Military Training, SC September 7, 2011 EA-1606: Draft Environmental Assessment Proposed Use of Savannah...

244

Tritium in the Savannah River Site environment  

Science Conference Proceedings (OSTI)

Tritium is released to the environment from many of the operations at the Savannah River Site. The releases from each facility to the atmosphere and to the soil and streams, both from normal operations and inadvertent releases, over the period of operation from the early 1950s through 1988 are presented. The fate of the tritium released is evaluated through environmental monitoring, special studies, and modeling. It is concluded that approximately 91% of the tritium remaining after decay is now in the oceans. A dose and risk assessment to the population around the site is presented. It is concluded that about 0.6 fatal cancers may be associated with the tritium released during all the years of operation to the population of about 625,000. This same population (based on the overall US cancer statistics) is expected to experience about 105,000 cancer fatalities from all types of cancer. Therefore, it is considered unlikely that a relationship between any of the cancer deaths occurring in this population and releases of tritium from the SRS will be found.

Murphy, C.E. Jr.; Bauer, L.R.; Hayes, D.W.; Marter, W.L.; Zeigler, C.C.; Stephenson, D.E.; Hoel, D.D.; Hamby, D.M.

1991-05-01T23:59:59.000Z

245

Savannah River Site Environmental Report for 2003  

SciTech Connect

The ''Savannah River Site Environmental Report for 2003'' (WSRC-TR-2004-00015) is prepared for the U.S. Department of Energy (DOE) according to requirements of DOE Order 231.1, ''Environment, Safety and Health Reporting'', and DOE Order 5400.5, ''Radiation Protection of the Public and Environment''. The report's purpose is to: (1) present summary environmental data that characterize site environmental management performance; (2) confirm compliance with environmental standards and requirements; (3) highlight significant programs and efforts; and (4) assess the impact of SRS operations on the public and the environment. This year's report reflects a continuing effort (begun in 2001) to streamline the document and thereby increase its cost effectiveness--without omitting valuable technical data. To that end each author will continue to work toward presenting results in summary fashion, focusing on historical trends. Complete data tables again are included on the CD inside the back cover of the report. The CD also features an electronic version of the report; an appendix of site, environmental sampling location, dose, and groundwater maps; and complete 2003 reports from a number of other SRS organizations.

A. MAMATEY

2003-01-01T23:59:59.000Z

246

Savannah River Site environmental report for 1988  

SciTech Connect

During 1988, as in previous years, Savannah River Site operations had no adverse impact on the general public or the environment. Based on the SRS site-specific code, the maximum radiation dose commitment to a hypothetical individual at the SRS boundary from 1988 SRS atmospheric releases of radioactive materials was 0.46 millirem (mrem) (0.0046 millisievert (mSv)). To obtain the maximum dose, an individual would have had to reside on the SRS boundary at the location of highest dose for 24 hours per day, 365 days per year, consume a maximum amount of foliage and meat which originated from the general vicinity of the plant boundary, and drink a maximum amount of milk from cows grazing at the plant boundary. The average radiation dose commitment from atmospheric releases to the hypothetical individual on the SRS boundary in 1988 was 0.18 mrem (0. 0018 mSv). This person, unlike the maximumly exposed individual, consumes an average amount of foliage, meat, and milk which originated from the foliage and animals living at the plant boundary.

Cummins, C.L.; Hetrick, C.S.; Stevenson, D.A. (eds.); Davis, H.A.; Martin, D.K.; Todd, J.L.

1989-01-01T23:59:59.000Z

247

SAVANNAH RIVER NATIONAL LABORATORYREGENERATIVE FUEL CELL PROJECT  

DOE Green Energy (OSTI)

A team comprised of governmental, academic and industrial partners led by the Savannah River National Laboratory developed and demonstrated a regenerative fuel cell system for backup power applications. Recent market assessments have identified emergency response and telecommunication applications as promising near-term markets for fuel cell backup power systems. The Regenerative Fuel Cell System (RFC) consisted of a 2 kg-per-day electrolyzer, metal-hydride based hydrogen storage units and a 5 kW fuel cell. Coupling these components together created a system that can produce and store its own energy from the power grid much like a rechargeable battery. A series of test were conducted to evaluate the performance of the RFC system under both steady-state and transit conditions that might be encountered in typical backup power applications. In almost all cases the RFC functioned effectively. Test results from the demonstration project will be used to support recommendations for future fuel cell and hydrogen component and system designs and support potential commercialization activities. In addition to the work presented in this report, further testing of the RFC system at the Center for Hydrogen Research in Aiken County, SC is planned including evaluating the system as a renewable system coupled with a 20kW-peak solar photovoltaic array.

Motyka, T

2008-11-11T23:59:59.000Z

248

SAVANNAH RIVER SITE COLD WAR HISTORIC PROPERTY DOCUMENTATION  

NLE Websites -- All DOE Office Websites (Extended Search)

WAR HISTORIC PROPERTY DOCUMENTATION WAR HISTORIC PROPERTY DOCUMENTATION NARRATIVE AND PHOTOGRAPHY CMX AND TNX SAVANNAH RIVER'S PILOT PLANTS Aiken County, South Carolina SAVANNAH RIVER SITE COLD WAR HISTORIC PROPERTY DOCUMENTATION CMX AND TNX CMX AND TNX SA SA V V ANNAH RIVER'S ANNAH RIVER'S PILOT PLANTS PILOT PLANTS Aiken County, South Carolina NARRATIVE AND PHOTOGRAPHY ii ABSTRACT This documentation was prepared in accordance with a Memorandum of Agreement (MOA) signed by the Department of Energy-Savannah River (DOE-SR) and the South Carolina Historic Preservation Office (SHPO) dated February 27, 2003, as well as the Consolidated MOA of August 2004. The MOA stipulated a thematic study and photographic documentation of 679-T and 678-T, known respectively as the CMX and TNX buildings. Initially, this area was called the CMX-TNX

249

Savannah River Site: Plutonium Preparation Project (PuPP) at Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Revieir of the Plutonium Revieir of the Plutonium Preparation Project at Savannah River Site October 2008 Dr. David S. Kosson, Vanderbilt University Dr. David R. Gallay, Logistics Management Institute Dr. R. Bruce Mathews, Consultant Mr. David Nulton, National Nuclear Security Administration (ret.) Dr. Kenneth Okafor, South Carolina State University Dr. Steven Krahn, U. S. Department of Energy I I External Technical Review of the Plutonium Preparation Project October 2008 - I Acknowledgements The Review Team thanks Ms. Michelle Ewart, Savantiah River Site, and Mr. Ricky Bell, for their exceptional support during this review. Ms. Ewart was the lead DOE representative responsible for organizing reviews held on-site by the Review Team. Mr. Theodore Venetz (Fluor Hanford Company) served as an observer to this review. The

250

Savannah River Site disaggregated seismic spectra  

SciTech Connect

The objective of this technical note is to characterize seismic ground motion at the Savannah River Site (SRS) by postulated earthquakes that may impact facilities at the site. This task is accomplished by reviewing the deterministic and probabilistic assessments of the seismic hazard to establish the earthquakes that control the hazard to establish the earthquakes that control the hazard at the site and then evaluate the associated seismic ground motions in terms of response spectra. For engineering design criteria of earthquake-resistant structures, response spectra serve the function of characterizing ground motions as a function of period or frequency. These motions then provide the input parameters that are used in the analysis of structural response. Because they use the maximum response, the response spectra are an inherently conservative design tool. Response spectra are described in terms of amplitude, duration, and frequency content, and these are related to source parameters, travel path, and site conditions. Studies by a number of investigators have shown by statistical analysis that for different magnitudes the response spectrum values are different for differing periods. These facts support Jennings' position that using different shapes of design spectra for earthquakes of different magnitudes and travel paths is a better practice than employing a single, general-purpose shape. All seismic ground motion characterization results indicate that the PGA is controlled by a local event with M[sub w] < 6 and R < 30km. The results also show that lower frequencies are controlled by a larger, more distant event, typically the Charleston source. The PGA of 0.2 g, based originally on the Blume study, is consistent with LLNL report UCRL-15910 (1990) and with the DOE position on LLNL/EPRI.

Stephenson, D.E.

1993-02-01T23:59:59.000Z

251

Savannah River Site disaggregated seismic spectra  

SciTech Connect

The objective of this technical note is to characterize seismic ground motion at the Savannah River Site (SRS) by postulated earthquakes that may impact facilities at the site. This task is accomplished by reviewing the deterministic and probabilistic assessments of the seismic hazard to establish the earthquakes that control the hazard to establish the earthquakes that control the hazard at the site and then evaluate the associated seismic ground motions in terms of response spectra. For engineering design criteria of earthquake-resistant structures, response spectra serve the function of characterizing ground motions as a function of period or frequency. These motions then provide the input parameters that are used in the analysis of structural response. Because they use the maximum response, the response spectra are an inherently conservative design tool. Response spectra are described in terms of amplitude, duration, and frequency content, and these are related to source parameters, travel path, and site conditions. Studies by a number of investigators have shown by statistical analysis that for different magnitudes the response spectrum values are different for differing periods. These facts support Jennings` position that using different shapes of design spectra for earthquakes of different magnitudes and travel paths is a better practice than employing a single, general-purpose shape. All seismic ground motion characterization results indicate that the PGA is controlled by a local event with M{sub w} < 6 and R < 30km. The results also show that lower frequencies are controlled by a larger, more distant event, typically the Charleston source. The PGA of 0.2 g, based originally on the Blume study, is consistent with LLNL report UCRL-15910 (1990) and with the DOE position on LLNL/EPRI.

Stephenson, D.E.

1993-02-01T23:59:59.000Z

252

Environmental Assessment for the Replacement Source of Steam for A Area at the Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 8 OCTOBER 2006 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE ENVIRONMENTAL ASSESSMENT FOR THE REPLACEMENT SOURCE OF STEAM FOR A AREA AT THE SAVANNAH RIVER SITE DOE/EA-1568 ENVIRONMENTAL ASSESSMENT FOR THE REPLACEMENT SOURCE OF STEAM FOR A AREA AT THE SAVANNAH RIVER SITE OCTOBER 2006 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE ii TABLE OF CONTENTS Page 1.0 INTRODUCTION ...............................................................................................1 1.1 Background ..............................................................................................1 1.2 Purpose and Need for Proposed Action.....................................................1 2.0 PROPOSED ACTION AND ALTERNATIVES

253

DOE/EA-1606 ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED USE OF SAVANNAH RIVER  

NLE Websites -- All DOE Office Websites (Extended Search)

EA-1606 EA-1606 ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED USE OF SAVANNAH RIVER SITE LANDS FOR MILITARY TRAINING December 2011 U.S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE DOE/EA-1606 ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED USE OF SAVANNAH RIVER SITE LANDS FOR MILITARY TRAINING December 2011 U.S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE ii This page is intentionally left blank iii TABLE OF CONTENTS PAGE 1.0 INTRODUCTION ...................................................................................................1 1.1 Background ..................................................................................................1 1.2 Purpose and Need for Action .......................................................................3

254

Food production and consumption near the Savannah River Site  

SciTech Connect

Routine operations at the Savannah River Site (SRS) result in the release of radionuclides to the atmosphere and to the Savannah River. The resulting radiological doses to the off-site maximum individual and the 80-km population are estimated on a yearly basis. These estimates are generated using dose models prescribed in the NRC Reg. Guide 1.109 for the commercial nuclear power industry. A study of land and water usage characteristics in the region of the Savannah River Site has been conducted to determine site-specific values of the NRC dose model parameters. The study`s scope included local characteristics of meat, milk, vegetable production; Savannah River recreational activities and fish harvests; meat, milk, vegetable, and seafood consumption rates; and Savannah River drinking-water populations. Average and maximum consumption rates of beef, milk, vegetables, and fish have been determined for individuals residing in the southern United States. The study suggest that many of the consumption rates provided by the NRC may not be appropriate for residents of the South. Average consumption rates are slightly higher than the defaults provided by the NRC. Maximum consumption rates, however, are typically lower than NRC values. Agricultural productivity in the SRS region was found to be quite different than NRC recommendations. Off-site doses have been predicted using both NRC and SRS parameter values to demonstrate the significance of site-specific data.

Hamby, D.M.

1991-12-31T23:59:59.000Z

255

Food production and consumption near the Savannah River Site  

SciTech Connect

Routine operations at the Savannah River Site (SRS) result in the release of radionuclides to the atmosphere and to the Savannah River. The resulting radiological doses to the off-site maximum individual and the 80-km population are estimated on a yearly basis. These estimates are generated using dose models prescribed in the NRC Reg. Guide 1.109 for the commercial nuclear power industry. A study of land and water usage characteristics in the region of the Savannah River Site has been conducted to determine site-specific values of the NRC dose model parameters. The study's scope included local characteristics of meat, milk, vegetable production; Savannah River recreational activities and fish harvests; meat, milk, vegetable, and seafood consumption rates; and Savannah River drinking-water populations. Average and maximum consumption rates of beef, milk, vegetables, and fish have been determined for individuals residing in the southern United States. The study suggest that many of the consumption rates provided by the NRC may not be appropriate for residents of the South. Average consumption rates are slightly higher than the defaults provided by the NRC. Maximum consumption rates, however, are typically lower than NRC values. Agricultural productivity in the SRS region was found to be quite different than NRC recommendations. Off-site doses have been predicted using both NRC and SRS parameter values to demonstrate the significance of site-specific data.

Hamby, D.M.

1991-01-01T23:59:59.000Z

256

Savannah River Site Federal Facility Agreement, January 15, 1993 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Site Agreement Name Savannah River Site Federal Facility Agreement Under Section 120 of CERCLA, January 15, 1993 State South Carolina Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Ensure that the environmental impacts associated with past and present activities at the Savannah River Site are thoroughly investigated and that appropriate response actions are taken to protect the public health, welfare, and the environment. Parties DOE; US EPA; South Carolina Department of Health and Environmental Control (SCDHEC) Date 1/15/1993 SCOPE * Ensure that the environmental impacts associated with past and present activities at the Savannah River Site are thoroughly investigated and that appropriate response actions are taken to protect the public health, welfare, and the environment.

257

Savannah River Site Marks Waste Processing Milestone with Melter's  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marks Waste Processing Milestone with Marks Waste Processing Milestone with Melter's 2,000th Waste Canister Savannah River Site Marks Waste Processing Milestone with Melter's 2,000th Waste Canister February 1, 2012 - 12:00pm Addthis A Savannah River Remediation employee uses a manipulator located inside a shielded enclosure at the Defense Waste Processing Facility, where a melter pours molten glass into a canister. A Savannah River Remediation employee uses a manipulator located inside a shielded enclosure at the Defense Waste Processing Facility, where a melter pours molten glass into a canister. AIKEN, S.C. - The second melter to operate in the 16-year history of the nation's largest radioactive waste glassification plant shows no signs of slowing after recently pouring its 2,000 canister of glass-formed hazardous

258

May 6, 2010, Savannah River Site Safety Training Workshop Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MAY o G aorn MAY o G aorn MEMORANDUM FOR JACK CRAIG MANAGER SAVANNAH RIVER sr~~ FROM: ARNOLDE.GUEVA~ DIRECTOR NATIONAL TRAINING CENTER OFFICE OF HEAL TH, SAFETY AND SECURITY SUBJECT: Savannah River Site Safety Training Workshop Report Attached please find the final report from the December 8-9, 2009 collaborative safety training workshop conducted in Savannah River Site (SRS), which was attended by key SRS federal, contractor and union representatives. We apologize for the belated delivery of this report. The report provides results and recommendations developed by workshop attendees on possible enhancements to the safety training programs across the SRS complex. It should be noted that SRS has already implemented numerous initiatives to gain

259

Independent Oversight Review, Savannah River Site - September 2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Independent Oversight Review, Savannah River Site - September 2012 September 2012 Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of construction quality at the U.S. Department of Energy (DOE) Savannah River Site (SRS) Salt Waste Processing Facility (SWPF). The focus of the review, performed on site between May 14 and 18, 2012, was piping and pipe supports. The review team also observed installation of two tanks in the dark cells (DCs). Subsequent to the onsite review, procurement records were reviewed for quality-related piping and piping system components.

260

Savannah River Ecology Laboratory Annual Technical Progress Report  

Office of Scientific and Technical Information (OSTI)

Savannah River Ecology Savannah River Ecology Laboratory Annual Technical Progress Report of Ecological Research Draft submitted July 31, 2001 Final submitted August 17,2001 Supported under Cooperative Agreement between The University of Georgia and the U.S. Department of Energy for The University of Georgia fiscal year ending June 30,2001 DE-F609-96SR18546 Paul M. Bertsch, Director Prepared by Laura Janecek and Brenda Rosier Savannah River Ecology Laboratory Drawer E Aiken, SC 29801 PH (803) 725-2472 FX 725-3309 E-mail: Rosier @srel.edu This report is provided for information only and is not to be considered formally contained herein without the express consent of the investigator. published literature. We request that no citations be made of information TABLE OF CONTENTS

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Implemntation of the Recovery Act at the Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation of the Recovery Act Implementation of the Recovery Act at the Savannah River Site OAS-RA-L-11-12 September 2011 Department of Energy Washington, DC 20585 September 29, 2011 MEMORANDUM FOR THE MANAGER, SAVANNAH RIVER OPERATIONS OFFICE FROM: Daniel M. Weeber, Director Environment, Technology, and Corporate Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Implementation of the Recovery Act at the Savannah River Site" Audit Report Number: OAS-RA-L-11-12 BACKGROUND The American Recovery and Reinvestment Act of 2009 (Recovery Act) provided the Department of Energy (Department) $5.1 billion for Defense Environmental Cleanup. These funds have afforded the Department's Office of Environmental Management (EM) the opportunity to reduce

262

Independent Oversight Review, Savannah River Site - January 2013 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2013 January 2013 Independent Oversight Review, Savannah River Site - January 2013 January 2013 Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design The Office of Enforcement and Oversight (Independent Oversight), within the U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS), conducted an independent review of construction quality and selected aspects for fire protection system design at the DOE Savannah River Site (SRS) Waste Solidification Building (WSB). The review was performed on site between September 24 and 27, 2012, focusing on the WSB process vessel ventilation (PVV) system and the fire protection active and passive

263

Preliminary Notice of Violation, Westinghouse Savannah River Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

97-12 97-12 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA-97-12 December 5, 1997 Preliminary Notice of Violation issued to Westinghouse Savannah River Company, related to an Unplanned Radioactive Material Intake at the Savannah River Site, (EA-97-12) This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances surrounding an unplanned intake of radioactive material [ ] by a worker that resulted in the worker receiving an occupational whole body dose of [a specifed value] Total Effective Dose Equivalent (TEDE). The intake, which exceeds the regulatory limit of 5 rems, was identified in April 1997 during a review of the worker's routine bioassay sample results. Subsequent investigation by the Westinghouse

264

Savannah River Site, Former Construction Worker Screening Projects |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site, Former Construction Worker Screening Projects Savannah River Site, Former Construction Worker Screening Projects Savannah River Site, Former Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: SRS Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Local Outreach Office: Charles Jernigan 1250 A Reynolds Street Augusta, GA 30901 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

265

ONSITE TRANSPORTATION AUTHORIZATION CHALLENGES AT THE SAVANNAH RIVER SITE  

SciTech Connect

Prior to 2008, transfers of radioactive material within the Savannah River Site (SRS) boundary, referred to as onsite transfers, were authorized by Transportation Safety Basis (TSB) documents that only required approval by the SRS contractor. This practice was in accordance with the existing SRS Transportation Safety Document (TSD). In 2008 the Department of Energy Savannah River Field Office (DOE-SR) requested that the SRS TSD be revised to require DOE-SR approval of all Transportation Safety Basis (TSB) documents. As a result, the primary SRS contractor embarked on a multi-year campaign to consolidate old or generate new TSB documents and obtain DOE-SR approval for each. This paper focuses on the challenges incurred during the rewriting or writing of and obtaining DOE-SR approval of all Savannah River Site Onsite Transportation Safety Basis documents.

Watkins, R.; Loftin, B.; Hoang, D.; Maxted, M.

2012-05-30T23:59:59.000Z

266

Microsoft Word - SavannahRiverRegDivers20020717.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Regional Diversification Initiative Savannah River Regional Diversification Initiative WASHINGTON, D.C. - The Department of Energy (DOE) today announced that it will award $300,000 to the Savannah River Regional Diversification Initiative (SRRDI). This block grant will fund SRRDI's administrative expenses as it continues working with other economic development organizations to diversify the economic base within the region. "The Energy Department is a good neighbor to the communities surrounding our sites," Secretary of Energy Spencer Abraham said. "Working with SRRDI and other community reuse organizations around the country, the Department has retained, expanded or created over 25,000 jobs for workers affected by restructuring efforts at DOE sites." SRRDI was established in 1993 to mitigate the adverse effects of the downsizing of the

267

Preliminary Notice of Violation, Westinghouse Savannah River Company -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2-01 2-01 Preliminary Notice of Violation, Westinghouse Savannah River Company - EA-2002-01 March 19, 2002 Preliminary Notice of Violation issued to Westinghouse Savannah River Company related to Safety Basis and Radiation Protection Violations at the Savannah River Site, During the period December 11-13, 2001, the Office of Price-Anderson Enforcement (OE) conducted an on-site investigation into the facts and circumstances surrounding ten events that were reported into the Noncompliance Tracking System (NTS) and/or the Occurrence Reporting and Processing System (ORPS) during 2001. These events included work control deficiencies that resulted in violations of your facility safety basis requirements, and As Low As Reasonably Achievable (ALARA) deficiencies that

268

Savannah River Nuclear Solutions, LLC Preliminary Notice of Violation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CERTIFIED MAIL CERTIFIED MAIL RETURN RECEIPT REQUESTED Garry W. Flowers President and Chief Executive Officer Savannah River Nuclear Solutions, LLC 6160 Executive Woodside Court Aiken, South Carolina 29803 WEA-2010-05 Dear Mr. Flowers: This letter refers to the Office of Health, Safety and Security's Office of Enforcement investigation into the facts and circumstances surrounding the nitric acid spill event that occurred in F Area on August 18,2009, and the electrical arc flash injury that occurred in the D Area powerhouse on September 23,2009, at the Savannah River Site. Based on an evaluation of the evidence in this matter, the U.S. Department of Energy (DOE) has concluded that violations of 10 C.F.R Part 851, Worker Safety and Health Program, by Savannah River Nuclear Solutions,

269

Savannah River Site Environmental Implentation Plan. Volume 3, Management and support programs  

SciTech Connect

This report describes the organizational responsibilities for the Savannah River Site Environmental program. Operations, Engineering and projects, Environment, safety, and health, Quality assurance, and the Savannah River Laboratory are described.

1989-08-01T23:59:59.000Z

270

Sorption and transport of iodine species in sediments from the Savannah River and Hanford Sites  

E-Print Network (OSTI)

Sorption and transport of iodine species in sediments from the Savannah River and Hanford Sites-iodoaniline) in sediments collected at the Savannah River and Hanford Sites, where anthropogenic 129 I from

Hu, Qinhong "Max"

271

Independent Oversight Inspection, Savannah River Site - December 2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December December 2009 Independent Oversight Inspection, Savannah River Site - December 2009 December 2009 Inspection of Reinforced Concrete Construction at the Savannah River Site Mixed Oxide Fuel Fabrication Facility The U.S. Department of Energy (DOE) Office of Independent Oversight conducted a nuclear safety inspection at the Mixed Oxide (MOX) Fuel Fabrication Facility (MFFF) construction project, focusing on construction quality, specifically for reinforced concrete, at the MFFF construction project. This purpose of the inspection was to provide mission support to site management in determining whether the facility structure is constructed in accordance with the applicable requirements. The overall quality of concrete that has been placed in the MFFF to date is

272

Savannah River Restart Peer Evaluation Program final examination report  

Science Conference Proceedings (OSTI)

During the period of August 13, 1990 through September 6, 1991 the Savannah River Peer Evaluation Program was administered during three distinct phases to 73 certified Central Control Room Operators, Central Control Room Supervisors, and Shift Technical Engineers assigned to the K Reactor, on the Savannah River Site (SRS). This program was conceived and developed by the Department of Energy (DOE) and it`s implementation satisfies recommendations made by the Defense Nuclear Facilities Safety Board. The review identified both strengths and weaknesses of the procedures and personnel.

Morgan, M.P.; Draper, D.G.

1991-12-01T23:59:59.000Z

273

Savannah River Restart Peer Evaluation Program final examination report  

Science Conference Proceedings (OSTI)

During the period of August 13, 1990 through September 6, 1991 the Savannah River Peer Evaluation Program was administered during three distinct phases to 73 certified Central Control Room Operators, Central Control Room Supervisors, and Shift Technical Engineers assigned to the K Reactor, on the Savannah River Site (SRS). This program was conceived and developed by the Department of Energy (DOE) and it's implementation satisfies recommendations made by the Defense Nuclear Facilities Safety Board. The review identified both strengths and weaknesses of the procedures and personnel.

Morgan, M.P.; Draper, D.G.

1991-12-01T23:59:59.000Z

274

Microbial Characteristics of Native Aquatic Species of Savannah River Wetlands  

SciTech Connect

In 1974 the Savannah River Site (SRS) was established as a National Environmental Research Park (NERP) in the United States. NERP provided locations for long-term ecological research investigation. Many of the ecological studies that have been conducted in the past mainly focused on the macroscopic view. The Savannah River Site contains wetlands that are home to many diverse organisms. We conducted a preliminary survey of microbial habitats in order to explore the biodiversity of species-specific symbionts. Bacterial surveys included viable counts, direct counts, isolation, identification, and metabolic profiles.

McKinsey, P.C.

2000-12-12T23:59:59.000Z

275

Savannah River Site ECS-2 tests uncertainty report  

SciTech Connect

This document presents a measurement uncertainty analysis for the instruments used in the ECS-2 test series conducted for the Savannah River Site at the Idaho National Engineering Laboratory. The tests are a series of downflow dryout heat transfer experiments designed to support computer code development and verification in setting limits for the Savannah River Production reactors. The measurements include input current, voltage, and power; air and water flows, fluid and metal temperatures, and absolute and differential pressures. An analysis of the data acquisition system as it relates to these measurements is also included. 18 refs., 6 figs., 12 tabs.

Wilkins, S.C.; Larson, R.A.

1990-07-01T23:59:59.000Z

276

Audit of the Savannah River Site's Quality Control Program for Groundwater Sampling, IG-0405  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 1997 0, 1997 MEMORANDUM FOR: THE SECRETARY FROM: John C. Layton Inspector General SUBJECT: INFORMATION: Report on "Audit of the Savannah River Site's Quality Control Program for Groundwater Sampling" BACKGROUND The Savannah River Site's groundwater remediation program was managed by the Department of Energy's (Department) management and operating contractor for the site, Westinghouse Savannah River Company (Westinghouse). One component of the remediation

277

SAVANNAH RIVER SITE ENVIRONMENTAL REPORT FOR 2009  

Science Conference Proceedings (OSTI)

The Savannah River Site Environmental Report for 2009 (SRNS-STI-2010-00175) is prepared for the U.S. Department of Energy (DOE) according to requirements of DOE Order 231.1A,'Environment, Safety and Health Reporting,' and DOE Order 5400.5, 'Radiation Protection of the Public and Environment.' The annual SRS Environmental Report has been produced for more than 50 years. Several hundred copies are distributed each year to government officials, universities, public libraries, environmental and civic groups, news media, and interested individuals. The report's purpose is to: (1) present summary environmental data that characterize site environmental management performance; (2) confirm compliance with environmental standards and requirements; and (3) highlight significant programs and efforts. SRS maintained its record of environmental excellence in 2009, as its operations continued to result in minimal impact to the offsite public and the surrounding environment. The site's radioactive and chemical discharges to air and water were well below regulatory standards for environmental and public health protection; its air and water quality met applicable requirements; and the potential radiation dose from its discharges was less than the national dose standards. The largest radiation dose that an offsite, hypothetical, maximally exposed individual could have received from SRS operations during 2009 was estimated to be 0.12 millirem (mrem). (An mrem is a standard unit of measure for radiation exposure.) The 2009 SRS dose is just 0.12 percent of the DOE all-pathway dose standard of 100 mrem per year, and far less than the natural average dose of about 300 mrem per year (according to Report No. 160 of the National Council of Radiation Protection and Measurements) to people in the United States. This 2009 all-pathway dose of 0.12 mrem was the same as the 2008 dose. Environmental monitoring is conducted extensively within a 2,000-square-mile network extending 25 miles from SRS, with some monitoring performed as far as 100 miles from the site. The area includes neighboring cities, towns, and counties in Georgia and South Carolina. Thousands of samples of air, rainwater, surface water, drinking water, groundwater, food products, wildlife, soil, sediment, and vegetation are collected by SRS and state authorities and analyzed for the presence of radioactive and nonradioactive contaminants. Compliance with environmental regulations and with DOE orders related to environmental protection provides assurance that onsite processes do not impact the public or the environment adversely. Such compliance is documented in this report. SRS had a National Pollutant Discharge Elimination System (NPDES) compliance rate of 99.92 percent in 2009, with only four of the 4,989 sample analyses performed exceeding permit limits. The NPDES program protects streams, reservoirs, and other wetlands by limiting the release of nonradiological pollution into surface waters. Discharge limits are set for each facility to ensure that SRS operations do not negatively impact aquatic life or degrade water quality.

Mamatey, A.; Fanning, R.

2010-08-19T23:59:59.000Z

278

Two Years Later: Bill Picciano of DOE's Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE))

We checked back in with Bill Picciano, who we last spoke to in October 2009 after he'd recently been hired at the Savannah River Site (SRS) through the Recovery Act. Now he's permanently employed at the Site as an Associate Engineer/Technical Support Specialist - a job he's proud to have.

279

Plan for the management of radioactive waste, Savannah River Plant  

SciTech Connect

The following areas are covered in the Savannah River Plant's radioactive waste management plan: program administration; description of waste generating processes; waste management facilities; radioactive wastes stored; plans and budget projections; and description of decontamination and decommissioning . (LK)

1975-07-01T23:59:59.000Z

280

Savannah River Technology Center monthly report, September 1992  

Science Conference Proceedings (OSTI)

This is a monthly progress report from the Savannah River Laboratory for the month of September, 1992. It has sections dealing with work in the broad areas of reactor safety, tritium processes and absorption, separations programs and wastes, environmental concerns and responses, waste management practices, and general concerns.

Ferrell, J.M. [comp.

1992-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Westinghouse independent safety review of Savannah River production reactors  

Science Conference Proceedings (OSTI)

Westinghouse Electric Corporation has performed a safety assessment of the Savannah River production reactors (K,L, and P) as requested by the US Department of Energy. This assessment was performed between November 1, 1988, and April 1, 1989, under the transition contract for the Westinghouse Savannah River Company's preparations to succeed E.I. du Pont de Nemours Company as the US Department of Energy contractor for the Savannah River Project. The reviewers were drawn from several Westinghouse nuclear energy organizations, embody a combination of commercial and government reactor experience, and have backgrounds covering the range of technologies relevant to assessing nuclear safety. The report presents the rationale from which the overall judgment was drawn and the basis for the committee's opinion on the phased restart strategy proposed by E.I. du Pont de Nemours Company, Westinghouse, and the US Department of Energy-Savannah River. The committee concluded that it could recommend restart of one reactor at partial power upon completion of a list of recommended upgrades both to systems and their supporting analyses and after demonstration that the organization had assimilated the massive changes it will have undergone.

Leggett, W.D.; McShane, W.J. (Westinghouse Hanford Co., Richland, WA (USA)); Liparulo, N.J.; McAdoo, J.D.; Strawbridge, L.E. (Westinghouse Electric Corp., Pittsburgh, PA (USA). Nuclear and Advanced Technology Div.); Toto, G. (Westinghouse Electric Corp., Pittsburgh, PA (USA). Nuclear Services Div.); Fauske, H.K. (Fauske and Associates, Inc., Burr Ridge, IL (USA)); Call, D.W. (Westinghouse Savannah R

1989-04-01T23:59:59.000Z

282

DOE Selects Savannah River Remediation, LLC for Liquid Waste Contract at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Selects Savannah River Remediation, LLC for Liquid Waste DOE Selects Savannah River Remediation, LLC for Liquid Waste Contract at Savannah River Site DOE Selects Savannah River Remediation, LLC for Liquid Waste Contract at Savannah River Site December 8, 2008 - 4:58pm Addthis Washington, D.C. -The U.S. Department of Energy (DOE) today announced the award to Savannah River Remediation, LLC as the liquid waste contractor for DOE's Savannah River Site (SRS) in Aiken, South Carolina. The contract is a cost-plus award-fee contract valued at approximately $3.3 billion over the entire contract, consisting of a base period of six years, plus an option to extend for up to two additional years. The base performance period of the contract will be from April 1, 2009 through March 31, 2015. A 90-day transition period will begin January 2, 2009.

283

Department of Energy Awards $200,000 Grant to the Savannah River Regional  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

200,000 Grant to the Savannah River 200,000 Grant to the Savannah River Regional Diversification Initiative Community Reuse Organization Department of Energy Awards $200,000 Grant to the Savannah River Regional Diversification Initiative Community Reuse Organization Department of Energy Awards $200,000 Grant to the Savannah River Regional Diversification Initiative Community Reuse Organization Department of Energy Awards $200,000 Grant to the Savannah River Regional Diversification Initiative Community Reuse Organization More Documents & Publications Energy Department Awards $295,000 Grant to Savannah River Regional Diversification Initiative Department of Energy Awards $300,000 to Savannah River Regional Diversification Initiative Department of Energy Awards $485,000 Grant to the Southern Ohio

284

DOE Selects Savannah River Remediation, LLC for Liquid Waste Contract at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Selects Savannah River Remediation, LLC for Liquid Waste DOE Selects Savannah River Remediation, LLC for Liquid Waste Contract at Savannah River Site DOE Selects Savannah River Remediation, LLC for Liquid Waste Contract at Savannah River Site December 8, 2008 - 4:58pm Addthis Washington, D.C. -The U.S. Department of Energy (DOE) today announced the award to Savannah River Remediation, LLC as the liquid waste contractor for DOE's Savannah River Site (SRS) in Aiken, South Carolina. The contract is a cost-plus award-fee contract valued at approximately $3.3 billion over the entire contract, consisting of a base period of six years, plus an option to extend for up to two additional years. The base performance period of the contract will be from April 1, 2009 through March 31, 2015. A 90-day transition period will begin January 2, 2009.

285

Savannah River Remediation Donates $10,000 to South Carolina State Nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Remediation Donates $10,000 to South Carolina State Savannah River Remediation Donates $10,000 to South Carolina State Nuclear Engineering Program Savannah River Remediation Donates $10,000 to South Carolina State Nuclear Engineering Program September 28, 2012 - 9:27am Addthis Savannah River Remediation presents a $10,000 to South Carolina State University to support its Nuclear Engineering Program. In the photo, from left: Kayla Miller, Savannah River Remediation Procurement Department and South Carolina State University 2010 graduate; Dr. John Corbitt, Acting Chairman of the South Carolina State University Board of Trustees; Dr. Cynthia Warrick, Interim South Carolina State University President; and Dave Olson, Savannah River Remediation President and Project Manager. Savannah River Remediation presents a $10,000 to South Carolina State

286

DOE Selects Savannah River Nuclear Solutions, LLC to Manage and Operate its  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Selects Savannah River Nuclear Solutions, LLC to Manage and DOE Selects Savannah River Nuclear Solutions, LLC to Manage and Operate its Savannah River Site DOE Selects Savannah River Nuclear Solutions, LLC to Manage and Operate its Savannah River Site January 10, 2007 - 10:24am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Savannah River Nuclear Solutions (SRNS), LLC has been selected as the management and operating contractor for DOE's Savannah River Site (SRS) in Aiken, South Carolina. The contract is a cost-plus award-fee contract valued at approximately $800 million per year and is for a five-year base period with the option to extend it for up to five additional years. SRNS is a limited liability corporation consisting of Fluor Federal Services, Inc., Honeywell International, Inc., and Newport News

287

DOE Selects Savannah River Nuclear Solutions, LLC to Manage and Operate its  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Nuclear Solutions, LLC to Manage and Savannah River Nuclear Solutions, LLC to Manage and Operate its Savannah River Site DOE Selects Savannah River Nuclear Solutions, LLC to Manage and Operate its Savannah River Site January 10, 2007 - 10:24am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that Savannah River Nuclear Solutions (SRNS), LLC has been selected as the management and operating contractor for DOE's Savannah River Site (SRS) in Aiken, South Carolina. The contract is a cost-plus award-fee contract valued at approximately $800 million per year and is for a five-year base period with the option to extend it for up to five additional years. SRNS is a limited liability corporation consisting of Fluor Federal Services, Inc., Honeywell International, Inc., and Newport News

288

Summary - Disposal Practices at the Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ETR-19 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Disposal Practices at the Savannah River Site Why DOE-EM Did This Review Disposal operations have been ongoing at the Savannah River Site (SRS) for over 50 years. Active disposal in E-Area, is near the center of the site. Although a wide range of wastes are being managed at the SRS, only low level radioactive wastes (LLRW) are disposed of on site. Wastes are disposed of in unlined slit and engineered trenches, and in low activity waste and intermediate level vaults. Some wastes are isolated in place with grout and all wastes will be covered with a cap that includes a hydraulic barrier to limit precipitation infiltration. The objective of this review was to

289

Enforcement Letter - Savannah River-07/21/1998  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21, 1998 21, 1998 Mr. A. L. Schwallie [ ] Westinghouse Savannah River Company Building 703-A, P.O. Box 616 Road 1 Aiken, SC 29802 Subject: Enforcement Letter Incomplete Corrective Action for Noncompliance Report: NTS-SR--WSRC-SLDHZD-1996-0001 Dear Mr. Schwallie: The Office of Enforcement and Investigation (EH-10) has received your letter dated June 30, 1998, Subject: Notification of Incomplete Corrective Action, in which you report that one corrective action for the above referenced NTS report was not completed and only partially implemented in the field. This action dealt with developing and implementing qualification standards for Generator Certification Officials and was reported by Westinghouse Savannah River Company (WSRC) as being completed June 30, 1997.

290

from Savannah River Nuclear Solutions, LLC NEWS SRNS's Maciaszek Elected  

NLE Websites -- All DOE Office Websites (Extended Search)

SRNS's Maciaszek Elected SRNS's Maciaszek Elected Fellow of Society of Fire Protection Engineers AIKEN, S.C. (July 11, 2012) - Stan Maciaszek, fire protection engineer for Savannah River Nuclear Solutions' (SRNS) Tritium Programs, was recently inducted as a Fellow of the Society of Fire Protection Engineers (SFPE). A Registered Professional Engineer, Maciaszek has served as a system engineer and design authority for the Savannah River Site tritium facilities for over 11 years, in which he has been responsible for the nu- clear safety related fire suppression systems. He actively supports and promotes fire pro- tection and fire protection engineering through mentoring, National Engineer Week activities and other education outreach programs, which introduce middle and high school students

291

Enforcement Letter-Savannah River-06/04/1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Mr. Ambrose Schwallie [ ] Westinghouse Savannah River Company Building 703-A P.O. Box 616 Road 1 Aiken, SC 29802 Dear Mr. Schwallie: Subject: Noncompliance with 10 CFR 830.120 (Quality Assurance Requirements) and 10 CFR 835 (Occupational Radiation Protection) at selected Savannah River Site Facilities On March 26-27, 1996, the Office of Enforcement and Investigation conducted an onsite evaluation of the five potential noncompliances reported to DOE by you in the Noncompliance Tracking System (NTS). Additionally, selected Occurrence Reporting Processing System (ORPS) reports associated with potential Price-Anderson Amendments Act (PAAA) enforcement issues were also reviewed. The following NTS and ORPS reports were included in the onsite review: 1. NTS-SR--WSRC-FCAN-1995-0001

292

Savannah River National Laboratory Feed | Open Energy Information  

Open Energy Info (EERE)

Savannah River National Laboratory Feed Savannah River National Laboratory Feed Jump to: navigation, search Home | About | Inventory | Partnerships | Capacity Building | Webinars | Reports | Events | News | List Serve CLEAN Member Feeds Center for Environment and National Security at Scripps Centro de EnergĂ­as Renovables (CER) The Children's Investment Fund Foundation (CIFF) Climate and Development Knowledge Network (CDKN) Climate Technology Initiative (CTI) ClimateWorks Foundation Coalition for Rainforest Nations (CfRN) Ecofys Energy Research Centre of the Netherlands (ECN) Energy Sector Management Assistance Program of the World Bank (ESMAP) Environment and Development Action in the Third World (ENDA-TM) German Aerospace Center (DLR) German Agency for International Cooperation (GIZ) Global Village Energy Partnership (GVEP)

293

The Savannah River Site's Groundwater Monitoring Program, second quarter 1989  

SciTech Connect

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-01-01T23:59:59.000Z

294

Native American prehistory of the middle Savannah River Valley  

Science Conference Proceedings (OSTI)

Archaeological investigations on the United States Department of Energy's (DOE) Savannah River Site (SRS) in South Carolina span 17 years and continue today through a cooperative agreement between DOE and the South Carolina Institute of Archaeology and Anthropology (SCIAA), University of South Carolina. The Savannah River Archaeological Research Program (SRARP) of SCIAA has been and continues to be the sole archaeological consultant for DOE-SRS. This report documents technical aspects of all prehistoric archaeological research conducted by the SRARP between 1973 and 1987. Further, this report provides interpretative contexts for archaeological resources as a basis for an archaeological resource plan reported elsewhere (SRARP 1989), and as a comprehensive statement of our current understanding of Native American prehistory. 400 refs., 130 figs., 39 tabs.

Sassaman, K.E.; Brooks, M.J.; Hanson, G.T.; Anderson, D.G.

1990-01-01T23:59:59.000Z

295

Principal Media Contact: DT Townsend Savannah River Nuclear Solutions, LLC  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Management Institute Selects SRNS as Finalist for Project Management Institute Selects SRNS as Finalist for International Award Project Management Institute cites SRS American Recovery and Reinvestment Act cleanup success in naming SRNS finalist for prestigious recognition AIKEN, S.C. (Sept. 4, 2013) - Department of Energy -SR contractor Savannah River Nuclear Solutions, LLC (SRNS) has been named one of three finalists for the "Project Management of the Year" award by the internationally-renowned Project Management Institute (PMI), the world's largest association for project managers. SRNS is being considered for this coveted award due to exceptional project management of the extensive work accomplished through Savannah River Site's $1.4 billion American Recovery and Reinvestment Act (ARRA) clean-

296

Savannah River Operations Office Interim Management of Nuclear  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Federal Register / Vol. 62, No. 70 / Friday, April 11, 1997 / Notices 1 The term ''failed'' means that the cladding on the fuel has been breached. The ROD, 60 Fed. Reg. 65300 (December 19, 1995), stated that failed fuel is indicated by gas releases from a fuel storage canister or visible failure of the cladding or canisters. select samples for specialized surveys for example on children's services or on access for persons with disabilities. [FR Doc. 97-9341 Filed 4-10-97; 8:45 am] BILLING CODE 4000-01-P DEPARTMENT OF ENERGY Savannah River Operations Office Interim Management of Nuclear Materials at the Savannah River Site AGENCY: Department of Energy. ACTION: Supplemental record of decision and supplement analysis determination. SUMMARY: The U.S. Department of Energy (DOE) prepared a final

297

Enforcement Letter -Savannah River-06/07/2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2000 7, 2000 Paul Bertsch, PhD [ ] Savannah River Ecology Laboratory Drawer E Aiken, SC 29802 Subject: Enforcement Letter (NTS-SR--SREL-2000-0001) Dear Dr. Bertsch: This letter refers to the Department of Energy's (DOE) evaluation of radioactive material control deficiencies occurring at the Savannah River Ecology Laboratory (SREL) in September 1999. During the underlying event, SREL investigators transported radioactive environmental samples from the Ukraine to SREL and University of Georgia facilities without appropriate labeling, monitoring, and controls. These deficiencies were identified in September 1999; however, they were not formally reported to DOE via the Noncompliance Tracking System (NTS) until March 14, 2000. The Office of Enforcement and Investigation (EH-Enforcement) staff discussed the details of the

298

Principal Media Contact: DT Townsend Savannah River Nuclear Solutions, LLC  

NLE Websites -- All DOE Office Websites (Extended Search)

Children to Benefit Children to Benefit from SRS "Toys for Tots" Campaign Over two decades of toy collection merit special celebration AIKEN, S.C. (Dec. 12, 2013) - Employees at the Department of Energy's Savannah River Site (SRS) are celebrating more than 20 years of supporting the U.S. Marine Reserves Toys for Tots campaign with the collection of more than 15,000 toys this year alone and over 220,000 toys since the start of SRS Toys for Tots campaigns in 1991. "Many families throughout the Central Savannah River Area have been hit hard by the continu- ing recession," said Julie Kirby, Chair, SRS Toys for Tots Campaign. "Our hearts and now our gifts go out to those in need, many of whom consist of the working poor and single mothers. We hope to brighten Christmas day for their children and lighten the burden they carry day to day."

299

Savannah River Tritium Enterprise exceeds productivity savings goals for  

NLE Websites -- All DOE Office Websites (Extended Search)

Tritium Enterprise exceeds productivity savings goals for Tritium Enterprise exceeds productivity savings goals for FY13 | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Savannah River Tritium Enterprise exceeds productivity savings ... Savannah River Tritium Enterprise exceeds productivity savings goals for FY13 Posted By Office of Public Affairs

300

Savannah River Tritium Enterprise exceeds productivity savings goals for  

National Nuclear Security Administration (NNSA)

Tritium Enterprise exceeds productivity savings goals for Tritium Enterprise exceeds productivity savings goals for FY13 | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Savannah River Tritium Enterprise exceeds productivity savings ... Savannah River Tritium Enterprise exceeds productivity savings goals for FY13 Posted By Office of Public Affairs

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

L-Reactor Operation Savannah River Plant Aiken, SC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51371 (F.R.) 51371 (F.R.) NOTICES DEPARTMENT OF ENERGY L-Reactor Operation, Savannah River Plant Aiken, South Carolina; Finding of No Significant Impact Monday, August 23, 1982 *36691 The Department of Energy (DOE) proposes to resume operation of L- Reactor at its Savannah River Plant at Aiken, South Carolina, as soon as it is ready for operation, scheduled for October 1983. The environmental impacts of the resumption of operation have been evaluated in an environmental assessment (DOE/EA-0195), prepared in accordance with the National Environmental Policy Act of 1969 (NEPA) as implemented by regulations promulgated by the Council on Environmental Quality (CEQ) (40 CFR Parts 1500 -1508, November 1978) and DOE implementing guidelines (45 FR 20694, March 28, 1980). Based on the analysis in the assessment, DOE has

302

Environmental audit of the Savannah River Ecology Laboratory (SREL)  

SciTech Connect

This report documents the results of the environmental audit conducted at the Savannah River Ecology Laboratory (SREL) at the Savannah River Site (SRS), principally in Aiken and Barnwell Counties, South Carolina. The audit was conducted by the US Department of Energy`s (DOE`s), Office of Environmental Audit (EH-24), beginning September 13, 1993, and ending September 23, 1993. The scope of the audit at SREL was comprehensive, addressing environmental activities in the technical areas of air; surface water/drinking water; groundwater/soil, sediment, and biota; waste management; toxic and chemical materials; inactive Waste sites; radiation; quality assurance; and environmental management. Specifically assessed was the compliance of SREL operations and activities with Federal, state, and local regulations; DOE Orders; and best management practices.

1993-09-01T23:59:59.000Z

303

Radioactive releases at the Savannah River Site, 1954--1989  

Science Conference Proceedings (OSTI)

This report is the continuation of a series of reports, previously titled, Releases of Radioactivity at the Savannah River Plant (DPSPU-YR-25-1). The reports reflect the use of air and liquid effluent sample analyses in determining the amount of radioactivity released from Savannah River Site (SRS) operations. The identification and characterization of these source terms since plant startup in 1954 have aided Site personnel in confining and limiting the amount of radioactivity released to the environment from SRS facilities. This document is an effluent/source term report; items falling under other categories, such as environmental spills or solid waste transport to the burial ground, are not included. Any classified or secret data have either been excluded, as in the case of 1960--1970 atmospheric releases of {sup 85}Kr from the Separations Areas, or combined to avoid classification, such as atmospheric tritium releases from the Separations Area.

Cummins, C.L.; Hetrick, C.S.; Martin, D.K.

1991-02-01T23:59:59.000Z

304

Risk assessment data bank design at the Savannah River Site  

SciTech Connect

The Savannah River Site has designed and implemented a database system containing a series of compilations of incidents used primarily for risk assessment. Four databases have been designed and implemented using advanced database management system computer software. These databases exist for reprocessing, fuel fabrication, waste management, and the Savannah River Technology Center. They are combined into one system caged the Risk Assessment Methodology (RAM) Fault Tree Data Banks. This paper will discuss the logical design of the data, the menus, and the operating platform. Built-in updating features, such as batch and on-line data entry; data validation methods; automatic update features; and expert system programs, will also be discussed. User functions, such as on-line search/view/report and statistical functions, will be presented. Security features and backup and recovery methods will also be covered.

Townsend, C.S.; Johnson, K.B.

1992-12-01T23:59:59.000Z

305

Risk assessment data bank design at the Savannah River Site  

SciTech Connect

The Savannah River Site has designed and implemented a database system containing a series of compilations of incidents used primarily for risk assessment. Four databases have been designed and implemented using advanced database management system computer software. These databases exist for reprocessing, fuel fabrication, waste management, and the Savannah River Technology Center. They are combined into one system caged the Risk Assessment Methodology (RAM) Fault Tree Data Banks. This paper will discuss the logical design of the data, the menus, and the operating platform. Built-in updating features, such as batch and on-line data entry; data validation methods; automatic update features; and expert system programs, will also be discussed. User functions, such as on-line search/view/report and statistical functions, will be presented. Security features and backup and recovery methods will also be covered.

Townsend, C.S.; Johnson, K.B.

1992-01-01T23:59:59.000Z

306

The Savannah River Site's Groundwater Monitoring Program, first quarter 1989  

Science Conference Proceedings (OSTI)

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site's Groundwater Monitoring Program. During first quarter 1989 (January--March), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the first quarter is presented in the Flagging Criteria section of this document. All analytical results from first quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-01-01T23:59:59.000Z

307

Assessment of Noble Gases in the Savannah River Site Environment  

SciTech Connect

A series of documents has been published that assesses the impact of various radionuclides released to the environment by Savannah River Site operations. The quantity released, the disposition of the radionuclides in the environment, and the dose to offsite individuals has been presented for carbon, cesium, iodine, plutonium, strontium, technetium, tritium, and uranium. An assessment of the impact of non-radioactive mercury also has been published.

Carlton, W.H.; Murphy, C.E. Jr.

1995-04-01T23:59:59.000Z

308

Tritium Processing and Containment Practices at the Savannah River Site  

DOE Green Energy (OSTI)

This report emphasizes the features of the United States Tritium Facility operation at the Savannah River Site. It outlines the buildings that represent the facility operating basis. It explores areas where new technology and proven methods of operation developed at the Site have made dramatic environmental and facility work enhancements over the last several years. These enhancements should be consideration for future facility designs and for any current tritium missions.

Buley, R.D.; Green, D.J.; Metzler, J.

1995-03-01T23:59:59.000Z

309

1996 Savannah River Site annual epidemiologic surveillance report  

Science Conference Proceedings (OSTI)

This report provides a summary of epidemiologic surveillance data collected from Savannah River Site from January 1, 1996 through December 31, 1996. The data were collected by a coordinator at Savannah River Site and submitted to the Epidemiologic Surveillance Data Center located at Oak Ridge Institute for Science and Education, where quality control procedures and preliminary data analyses were carried out. The analyses were interpreted and the final report prepared by the DOE Office of Epidemiologic Studies. The information in this report provides highlights of the data analyses conducted on the 1996 data collected from Savannah River Site. The main sections of the report include: work force characteristics; absences due to injury or illness lasting 5 or more consecutive workdays; workplace illnesses, injuries, and deaths that were reportable to the Occupational Safety and Health Administration (''OSHA-recordable'' events); and disabilities and deaths among current workers. The 1996 report includes a new section on time trends that provides comparative information on the health of the work force from 1994 through 1996.

None

2000-03-01T23:59:59.000Z

310

1997 Savannah River Site annual epidemiologic surveillance report  

Science Conference Proceedings (OSTI)

This report provides a summary of epidemiologic surveillance data collected from Savannah River Site from January 1, 1997 through December 31, 1997. The data were collected by a coordinator at Savannah River Site and submitted to the Epidemiologic Surveillance Data Center located at Oak Ridge Institute for Science and Education, where quality control procedures and preliminary data analyses were carried out. The analyses were interpreted and the final report prepared by the DOE Office of Epidemiologic Studies. The information in this report provides highlights of the data analyses conducted on the 1997 data collected from Savannah River Site. The main sections of the report include: work force characteristics; absences due to injury or illness lasting 5 or more consecutive workdays; workplace illnesses, injuries, and deaths that were reportable to the Occupational Safety and Health Administration (''OSHA-recordable'' events); and disabilities and deaths among current workers. The 199 7 report includes a section on time trends that provides comparative information on the health of the work force from 1994 through 1997.

None

2000-06-01T23:59:59.000Z

311

SRNS-RP-2013-00005 Savannah River Site Ten Year Site Plan FY  

NLE Websites -- All DOE Office Websites (Extended Search)

SRNS-RP-2013-00005 SRNS-RP-2013-00005 Savannah River Site Ten Year Site Plan FY 2014 - 2023 May 2013 United States Department of Energy Savannah River Site Ten Year Site Plan FY 2014 - 2023 May 2013 Prepared by: Savannah River Nuclear Solutions, LLC A Fluor Daniel Partnership Savannah River Site Aiken, SC 29808 SRNS-RP-2013-00005 Savannah River Site Ten Year Site Plan SRNS-RP-2013-00005 May 2013 DISCLAIMER This report was prepared by Savannah River Nuclear Solutions LLC (SRNS) for the United States Department of Energy under Contract No. DE-AC09-08SR22470 and is an account of work performed under that contract. Reference herein to any specific commercial product, process or services by trademark, name, manufacturer, or otherwise does not necessarily constitute or imply endorsement,

312

Preliminary Notice of Violation, Savannah River Company - EA-97-11 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Company - EA-97-11 Savannah River Company - EA-97-11 Preliminary Notice of Violation, Savannah River Company - EA-97-11 November 24, 1997 Preliminary Notice of Violation issued to Westinghouse Savannah River Company, related to Quality Assurance Program Deficiencies at the Defense Waste Processing Facility at the Savannah River Site, (EA-97-11) This letter refers to the Department of Energy's (DOE) evaluation of the circumstances surrounding Quality Assurance (QA) Program deficiencies associated with three safety grade Nitrogen Systems placed into operation at the Defense Waste Processing Facility (DWPF) in March 1996. [ ] The QA deficiencies involve the failure of Westinghouse Savannah River Company (WSRC) personnel to perform an adequate acceptance review for compliance

313

Cutting-Edge Savannah River Site Project Avoids Millions in Costs, Removes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cutting-Edge Savannah River Site Project Avoids Millions in Costs, Cutting-Edge Savannah River Site Project Avoids Millions in Costs, Removes Chemical Solvents from Underground: Project avoided costs totaling more than $15 million, removed tons of chemical solvents from beneath the Savannah River Site Cutting-Edge Savannah River Site Project Avoids Millions in Costs, Removes Chemical Solvents from Underground: Project avoided costs totaling more than $15 million, removed tons of chemical solvents from beneath the Savannah River Site June 13, 2012 - 12:00pm Addthis Harrel McCray, left, and Joey Clark, employees with SRS management and operations contractor, Savannah River Nuclear Solutions, stand by an extensive SRS cleanup system that safely and successfully rid the site of more than 33,000 gallons of non-radioactive chemical

314

Community-Minded Interns at Savannah River Site Help Area Residents in Need  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Community-Minded Interns at Savannah River Site Help Area Residents Community-Minded Interns at Savannah River Site Help Area Residents in Need with Home Repairs Community-Minded Interns at Savannah River Site Help Area Residents in Need with Home Repairs August 1, 2012 - 12:00pm Addthis James Cunningham, right, nails a board to the framework for a deck project in Jackson. Ashley Flowers, Savannah River Remediation project controls intern, assists by holding the board in place. James Cunningham, right, nails a board to the framework for a deck project in Jackson. Ashley Flowers, Savannah River Remediation project controls intern, assists by holding the board in place. AIKEN, S.C. - More than two dozen college interns who worked at the Savannah River Site (SRS) this summer joined other volunteers and headed into area neighborhoods to help people in need with home repairs.

315

from Savannah River Nuclear Solutions, LLC NEWS SRS Employees Donate Food to Golden Harvest Food Bank  

NLE Websites -- All DOE Office Websites (Extended Search)

Employees Donate Food to Golden Harvest Food Bank Employees Donate Food to Golden Harvest Food Bank AIKEN, S.C. - (June 7, 2012) Today, the Savannah River Site (SRS) donated $22,000 and 18,000 pounds of food during its annual food drive for the Golden Harvest Food Bank. Several SRS organizations participated in this food drive-Savannah River Nuclear Solutions, Savannah River Remediation, U.S. Forest Service-Savannah River, URS and WSI- Savannah River. The SRS food drive is one of Golden Harvest Food Bank's largest, local fund-raisers. According to Savannah River Nuclear Solutions, LLC President and CEO Dwayne Wilson, the Site's past food drives have collec- tively yielded over 262,475 pounds of food for Golden Harvest. "We're pleased to support Golden Harvest in their highly effective efforts as they strive

316

Cutting-Edge Savannah River Site Project Avoids Millions in Costs, Removes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cutting-Edge Savannah River Site Project Avoids Millions in Costs, Cutting-Edge Savannah River Site Project Avoids Millions in Costs, Removes Chemical Solvents from Underground: Project avoided costs totaling more than $15 million, removed tons of chemical solvents from beneath the Savannah River Site Cutting-Edge Savannah River Site Project Avoids Millions in Costs, Removes Chemical Solvents from Underground: Project avoided costs totaling more than $15 million, removed tons of chemical solvents from beneath the Savannah River Site June 13, 2012 - 12:00pm Addthis Harrel McCray, left, and Joey Clark, employees with SRS management and operations contractor, Savannah River Nuclear Solutions, stand by an extensive SRS cleanup system that safely and successfully rid the site of more than 33,000 gallons of non-radioactive chemical

317

Community-Minded Interns at Savannah River Site Help Area Residents in Need  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Community-Minded Interns at Savannah River Site Help Area Residents Community-Minded Interns at Savannah River Site Help Area Residents in Need with Home Repairs Community-Minded Interns at Savannah River Site Help Area Residents in Need with Home Repairs August 1, 2012 - 12:00pm Addthis James Cunningham, right, nails a board to the framework for a deck project in Jackson. Ashley Flowers, Savannah River Remediation project controls intern, assists by holding the board in place. James Cunningham, right, nails a board to the framework for a deck project in Jackson. Ashley Flowers, Savannah River Remediation project controls intern, assists by holding the board in place. AIKEN, S.C. - More than two dozen college interns who worked at the Savannah River Site (SRS) this summer joined other volunteers and headed into area neighborhoods to help people in need with home repairs.

318

U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER SITE * AIKEN * SC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

* SAVANNAH RIVER SITE * AIKEN * SC * SAVANNAH RIVER SITE * AIKEN * SC from Savannah River National Laboratory srnl.doe.gov SRNL is a DOE National Laboratory operated by Savannah River Nuclear Solutions. The SRNL Technical Assistance Program: When standard approaches don't work Teams provide phased technical solutions that combine applied strategies with technologies that are carefully matched to site- specific conditions and issues. The teams then delineate steps to optimize and focus final selection and implementation of strategies. At SRNL, we focus on matching remediation technologies with real- world conditions and desired goals to achieve transformational outcomes for the Environmental Management program. This innovation and flexibility is vital in meeting the needs

319

Savannah River Technology Center. Quarterly report, July 1, 1996--September 30, 1996  

SciTech Connect

This report provides information and progress from the Savannah River Technology Center. Topics include tritium activities, separations, environmental, and waste management activities.

Ferrell, J.M.

1997-07-01T23:59:59.000Z

320

Site Selection for Surplus Plutonium Disposition Facilities at the Savannah River Site  

Science Conference Proceedings (OSTI)

The purpose of this study is to identify, assess, and rank potential sites for the proposed Surplus Plutonium Disposition Facilities complex at the Savannah River Site.

Wike, L.D.

2000-12-13T23:59:59.000Z

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

from Savannah River Nuclear Solutions, LLC NEWS Multi-Year Modernizati...  

NLE Websites -- All DOE Office Websites (Extended Search)

for the system that tracks tritium reservoirs throughout their lifecycle. The National Nuclear Security Administration (NNSA), SRTE and Savannah River National Laboratory all rely...

322

Use of Noncompetitive Procurements to Obtain Services at the Savannah River Site, IG-0862  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Use of Noncompetitive Use of Noncompetitive Procurements to Obtain Services at the Savannah River Site DOE/IG-0862 April 2012 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 April 10, 2012 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Use of Noncompetitive Procurements to Obtain Services at the Savannah River Site" INTRODUCTION AND OBJECTIVE Savannah River Nuclear Solutions, LLC (SRNS), assumed management and operating responsibility for the Department of Energy's Savannah River Site located near Aiken, South Carolina, in August 2008. Under its contract, SRNS is responsible for environmental cleanup,

323

DOE/EA-1605: Environmental Assessment for Biomass Cogeneration and Heating Facilities at the Savannah River Site (August 2008)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

605 605 ENVIRONMENTAL ASSESSMENT FOR BIOMASS COGENERATION AND HEATING FACILITIES AT THE SAVANNAH RIVER SITE AUGUST 2008 U. S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE DOE/EA-1605 ENVIRONMENTAL ASSESSMENT FOR BIOMASS COGENERATION AND HEATING FACILITIES AT THE SAVANNAH RIVER SITE AUGUST 2008 U.S. DEPARTMENT OF ENERGY SAVANNAH RIVER OPERATIONS OFFICE SAVANNAH RIVER SITE This page intentionally left blank - i - TABLE OF CONTENTS Page 1.0 INTRODUCTION ...................................................................................................1 1.1 Background and Proposed Action ...............................................................1 1.2 Purpose and Need ........................................................................................4

324

Assessment of mercury in the Savannah River Site environment  

SciTech Connect

Mercury has been valued by humans for several millennia. Its principal ore, cinnabar, was mined for its distinctive reddish-gold color and high density. Mercury and its salts were used as medicines and aphrodisiacs. At SRS, mercury originated from one of the following: as a processing aid in aluminum dissolution and chloride precipitation; as part of the tritium facilities` gas handling system; from experimental, laboratory, or process support facilities; and as a waste from site operations. Mercury is also found in Par Pond and some SRS streams as the result of discharges from a mercury-cell-type chlor-alkali plant near the city of Augusta, GA. Reactor cooling water, drawn from the Savannah River, transported mercury onto the SRS. Approximately 80,000 kg of mercury is contained in the high level waste tanks and 10,000 kg is located in the SWDF. Additional quantities are located in the various seepage basins. In 1992, 617 wells were monitored for mercury contamination, with 47 indicating contamination in excess of the 0.002-ppm EPA Primary Drinking Water Standard. More than 20 Savannah River Ecology Laboratory (SREL) reports and publications pertinent to mercury (Hg) have been generated during the last two decades. They are divided into three groupings: SRS-specific studies, basic studies of bioaccumulation, and basic studies of effect. Many studies have taken place at Par Pond and Upper Three Runs Creek. Mercury has been detected in wells monitoring the groundwater beneath SRS, but not in water supply wells in excess of the Primary Drinking Water Limit of 0.002 ppm. There has been no significant release of mercury from SRS to the Savannah River. While releases to air are likely, based on process knowledge, modeling of the releases indicates concentrations that are well below the SCDHEC ambient standard.

Kvartek, E.J.; Carlton, W.H.; Denham, M.; Eldridge, L.; Newman, M.C.

1994-09-01T23:59:59.000Z

325

Radioactive releases at the Savannah River Site, 1954--1988  

Science Conference Proceedings (OSTI)

Radioactive Releases at the Savannah River Site, 1954--1988 (WSRC-RP-89-737) is the continuation of a series of reports, previously titled Releases of Radioactivity at the Savannah River Plant (DPSU-1-YR-25). The series reflects the use of air and liquid effluent sample analyses in determining the amount of radioactivity released from Savannah River Site (SRS) operations. The identification and characterization of these source terms since plant startup in 1954 have aided Site personnel in confining and limiting the amount of radioactivity released to the environment from SRS facilities. Data contained in this report are used for a variety of purposes, including the calculation of offsite dose estimates and aiding special environmental studies. This document is an effluent/source term report. The report is divided into four summary sections. Summary A details volumes of air and water released from emission sources since plant startup. Summary B lists annual radioactive release data from these emission sources, grouped by nuclide and area. Summary C provides yearly totals of radioactive releases by radionuclide, under the headings Atmospheric,'' Liquid to streams,'' or Liquid to Seepage Basins'' accordingly. Monthly radioactive releases from each emission source from 1986 to 1988 are found in Summary D. Where appropriate, headings in the summary tables have been changed to clarify and simplify emission data (see Appendix B). Additionally, any new discharge points, such as the liquid discharge from the Effluent Treatment Facility (ETF), are included in this report. A listing of 1988 source term and onsite discharge designations is provided in Appendix C. 36 refs.

Hetrick, C.S.; Martin, D.K.

1988-01-01T23:59:59.000Z

326

SBOT SOUTH CAROLINA SAVANNAH RIVER LAB POC Sharon Campbell Telephone  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SOUTH CAROLINA SOUTH CAROLINA SAVANNAH RIVER LAB POC Sharon Campbell Telephone (800) 888-7986 Email sharon-pmmd.campbell@srs.gov EDUCATION Professional and Management Development Training 611430 GOODS Motor Vehicle Supplies and New Parts Merchant Wholesalers 423120 Tire and Tube Merchant Wholesalers 423130 Lumber, Plywood, Millwork, and Wood Panel Merchant Wholesalers 423310 Photographic Equipment and Supplies Merchant Wholesalers 423410 Office Equipment Merchant Wholesalers 423420 Computer and Computer Peripheral Equipment and Software Merchant Wholesalers 423430 Other Professional Equipment and Supplies Merchant Wholesalers 423490 Electrical Apparatus and Equipment, Wiring Supplies, and Related Equipment Merchant Wholesalers 423610 Warm Air Heating and Air-Conditioning Equipment and Supplies Merchant Wholesalers

327

Savannah River Site K-Reactor Probabilistic Safety Assessment  

SciTech Connect

This report gives the results of a Savannah River Site (SRS) K-Reactor Probabilistic Safety Assessment (PSA). Measures of adverse consequences to health and safety resulting from representations of severe accidents in SRS reactors are presented. In addition, the report gives a summary of the methods employed to represent these accidents and to assess the resultant consequences. The report is issued to provide useful information to the U. S. Department of Energy (DOE) on the risk of operation of SRS reactors, for insights into severe accident phenomena that contribute to this risk, and in support of improved bases for other DOE programs in Heavy Water Reactor safety.

Brandyberry, M.D.; Bailey, R.T.; Baker, W.H.; Kearnaghan, D.P.; O`Kula, K.R.; Wittman, R.S.; Woody, N.D. [Westinghouse Savannah River Co., Aiken, SC (United States); Amos, C.N.; Weingardt, J.J. [Science Applications International Corp. (United States)

1992-12-01T23:59:59.000Z

328

Adverse experiences with nitric acid at the Savannah River Site  

SciTech Connect

Nitric acid is used routinely at the Savannah River Site (SRS) in many processes. However, the site has experienced a number of adverse situations in handling nitric acid. These have ranged from minor injuries to personnel to significant explosions. This document compiles many of these events and includes discussions of process upsets, fires, injuries, and toxic effects of nitric acid and its decomposition products. The purpose of the publication is to apprise those using the acid that it is a potentially dangerous material and can react in many ways as demonstrated by SRS experience. 10 refs.

Durant, W.S.; Craig, D.K.; Vitacco, M.J.; McCormick, J.A.

1991-06-01T23:59:59.000Z

329

Savannah River Site environmental report for 1991. [Contains Glossary  

SciTech Connect

This report describes environmental activities conducted on and in the vicinity of the Savannah River Site (SRS) in Aiken, S.C., from Jan. 1 to Dec. 31, 1991, with an update on compliance activities through April 1, 1992. The report is a single volume with a separate summary pamphlet highlighting the major findings for 1991. The report is divided into an executive summary and 14 chapters containing information on environmental compliance issues, environmental monitoring methods and programs, and environmental research activities for 1991, as well as historical data from previous years. Analytical results, figures, charts, and data tables relevant to the environmental monitoring program for 1991 at SRS are included.

Arnett, M.W.; Karapatakis, L.K.; Mamatey, A.R.; Todd, J.L.

1991-01-01T23:59:59.000Z

330

Sr$sup 90$ MONITORING AT THE SAVANNAH RIVER PLANT  

SciTech Connect

Radioassays of milk, soil, grass, and other material located near the Savannah River Plant showed no detectable Sr/sup 90/ due to plant wastes. These assays indicated that the Sr/sup 90/ found in this geographical area (25-mile radius of SRP) was nuclear weapons debris. Sr/sup 90/ was separated from milk by absorption on cation exchange resin. An extraction technique was used in assaying Sr/sup 90/ in all types of samples. Cs/sup 137//Sr/sup 90/ ratios were found to be constant in soil samples. (auth)

Butler, F.E.

1960-05-01T23:59:59.000Z

331

Heat Transfer Laboratory of the Savannah River Laboratory  

SciTech Connect

The Heat Transfer Laboratory, recently- constructed adjacent to the main Savannah River Laboratory building, was designed to mock up nuclear heating and cooling of reactor components under a variety- of conditions. Nuclear heating is simulated by electrical resistance heating of test sections with a 3 MW directcurrent power supply. Cooling is provided by water. Three test stations (A, B, and C) are available for testing full-size fuel assemblies, measuring flow instabilities, and for measuring burnout heat fluxes. Safeguards provided in the design of the facility and conservative operating procedures minimize or elimnate potential hazards. (auth)

Knoebel, D.H.; Harris, S.D.

1973-10-01T23:59:59.000Z

332

Environmental Survey preliminary report, Savannah River Plant, Aiken, South Carolina  

Science Conference Proceedings (OSTI)

This report contains the preliminary findings based on the first phase of an Environmental Survey at the Department of Energy (DOE) Savannah River Plant (SRP), located at Aiken, South Carolina. The Survey is being conducted by DOE's Office of Environment, Safety and Health. The following topics are discussed: general site information; air, soil, surface water and ground water; hydrogeology; waste management; toxic and chemical materials; release of tritium oxides; radioactivity in milk; contamination of ground water and wildlife; pesticide use; and release of radionuclides into seepage basins. 149 refs., 44 figs., 53 tabs.

Not Available

1987-08-01T23:59:59.000Z

333

Review of the Savannah River Site Tritium Facilities Implementation Verification Review Processes  

NLE Websites -- All DOE Office Websites (Extended Search)

Savannah River Site Tritium Facilities Savannah River Site Tritium Facilities Implementation Verification Review Processes June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1 3.0 Scope..................................................................................................................................................... 1

334

Review of the Savannah River Site Tritium Facilities Implementation Verification Review Processes  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Tritium Facilities Savannah River Site Tritium Facilities Implementation Verification Review Processes June 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1 3.0 Scope..................................................................................................................................................... 1

335

Commercial integration and partnering at Savannah River Site  

Science Conference Proceedings (OSTI)

Savannah River Site (SRS), particularly the Savannah River Technology Center (SRTC) with the experience from the first successful Integrated Technology Demonstration, can provide an excellent foundation for meeting DOE-EM`s objectives with the new DOE-EM five focus area approach. With this in mind, SRTC established an activity to pursue full commercialization of environmental technologies. This report is an assessment of the status of commercialization at SRS and provides recommendations for enhancement as well as some tools critical to implementation. A review was made of the current situation at SRS with regards to taking technology development to commercial fruition. This was done from the perspective of comparing it to known commercialization models and processes. It was found that SRTC already works through many of the steps in these processes. With integration and action-oriented efforts of the inclusion of business and market factors, SRTC could become an aggressive, successful developer of commercialized technologies. Commercial success criteria tools were developed with regards to integrating them with SRTC selection criteria to ensure that all critical factors are covered in technology commercialization project evaluations. Private investors are very clear that their interest lies in funding commercial enterprises, not merely technologies. Mobilizing private capital is critical to real job growth and long-term economic development. Also, potential industry partners were identified that are willing to be involved with SRS` technology applications and regional development efforts. As another important component to success, regional support organizations were reviewed and evaluated.

Steele, J.R. [Westinghouse Savannah River Co., Aiken, SC (United States); Babione, R.A.; Shikashio, L.A.; Wacaster, A.J.; Paterson, A.D. [SCIENTECH, Inc., Idaho Falls, ID (United States)

1994-06-01T23:59:59.000Z

336

Improved neutron monitor systems for Savannah River Site separations facilities  

Science Conference Proceedings (OSTI)

The Savannah River Laboratory (SRL), in conjunction with Savannah River Site (SRS) Separations Technology personnel, has developed and implemented a comprehensive program to improve the performance and reliability of neutron detector systems (neutron monitors) in the SRS separations areas. The neutron monitors, which monitor the buildup of fissile material in the mixer-settler banks of the solvent extraction process, are important nuclear safety control devices. A review of the performance history of the neutron monitors reveals that many of the systems exhibit problems arising from several causes, including: low neutron sensitivity, high susceptibility to electromagnetic interferences (due to long cable runs between detectors and their electronics), and high maintenance requirements. To address these problems, the neutron monitor improvement program encompasses both technical and administrative improvements, including: substitution of more sensitive neutron monitors at many locations in the solvent extraction areas, the development of an integrated preamplifier/amplifier package to eliminate long cable runs, and improvements in the neutron monitor functional test procedures to reduce maintenance requirements. The implementation of these improvements, already partially complete, is expected to provide enhanced operation and reliability for the neutron monitors. This paper will present a description of the solvent neutron monitors as well as technical details of the improvement program. 2 refs., 5 figs., 1 tab.

Griffin, J.C.

1989-01-01T23:59:59.000Z

337

Savannah River Site Approved Site Treatment Plan, 1998 Annual Update  

Science Conference Proceedings (OSTI)

The U.S. Department of Energy, Savannah River Operations Office (DOE- SR),has prepared the Site Treatment Plan (STP) for Savannah River Site (SRS) mixed wastes in accordance with RCRA Section 3021(b), and SCDHEC has approved the STP (except for certain offsite wastes) and issued an order enforcing the STP commitments in Volume I. DOE-SR and SCDHEC agree that this STP fulfills the requirements contained in the FFCAct, RCRA Section 3021, and therefore,pursuant to Section 105(a) of the FFCAct (RCRA Section 3021(b)(5)), DOE`s requirements are to implement the plan for the development of treatment capacities and technologies pursuant to RCRA Section 3021.Emerging and new technologies not yet considered may be identified to manage waste more safely, effectively, and at lower cost than technologies currently identified in the plan. DOE will continue to evaluate and develop technologies that offer potential advantages in public acceptance, privatization, consolidation, risk abatement, performance, and life-cycle cost. Should technologies that offer such advantages be identified, DOE may request a revision/modification of the STP in accordance with the provisions of Consent Order 95-22-HW.The Compliance Plan Volume (Volume I) identifies project activity schedule milestones for achieving compliance with Land Disposal Restrictions (LDR). Information regarding the technical evaluation of treatment options for SRS mixed wastes is contained in the Background Volume (Volume II) and is provided for information.

Lawrence, B. [Westinghouse Savannah River Company, AIKEN, SC (United States); Berry, M.

1998-03-01T23:59:59.000Z

338

EIS-0303: Savannah River Site High-Level Waste Tank Closure | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

03: Savannah River Site High-Level Waste Tank Closure 03: Savannah River Site High-Level Waste Tank Closure EIS-0303: Savannah River Site High-Level Waste Tank Closure SUMMARY This EIS evaluates alternatives for closing 49 high-level radioactive waste tanks and associated equipment such as evaporator systems, transfer pipelines, diversion boxes, and pump pits. DOE selected the preferred alternative identified in the Final EIS, Stabilize Tanks-Fill with Grout, to guide development and implementation of closure of the high-level waste tanks and associated equipment at the Savannah River Site. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD March 5, 2012 EIS-0303: Supplement Analysis Savannah River Site High-Level Waste Tank Closure, SC July 8, 2011 EIS-0303: Notice of Intent to Prepare an Environmental Impact Statement

339

Savannah River Site Team Wins Carolina Challenge at 2012 DOE Security  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Team Wins Carolina Challenge at 2012 DOE Savannah River Site Team Wins Carolina Challenge at 2012 DOE Security Protection Officer Competition Savannah River Site Team Wins Carolina Challenge at 2012 DOE Security Protection Officer Competition April 26, 2012 - 12:00pm Addthis Media Contact Bill Taylor, (803) 952-8564, bill.taylor@srs.gov Savannah River Site, Aiken, S.C. - Security Protection Officers from Savannah River Site's (SRS) security contractor WSI-SRS, today won the Department of Energy (DOE) Secretary's Trophy as the top DOE team in the 2012 Security Protection Officer Team Competition (SPOTC)- 2012 Carolina Challenge, held here, April 22-26. It was the 40th anniversary of the SPOTC competition. In 2012 Carolina Challenge, SRS was among 11 teams representing DOE sites. The threeman team competition was won by Security Protection Officers

340

Toy to the World: Savannah River Site Celebrates 21 Years of Bringing Joy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Toy to the World: Savannah River Site Celebrates 21 Years of Toy to the World: Savannah River Site Celebrates 21 Years of Bringing Joy to Kids Toy to the World: Savannah River Site Celebrates 21 Years of Bringing Joy to Kids December 11, 2012 - 12:00pm Addthis An elf from DOE's Savannah River Site poses with Santa Claus, who holds a bike, one of the more than 14,200 toys federal employees and contractors donated to the U.S. Marine Toys for Tots Program. Mounds of bikes and other donated toys for the program can be seen in the background. An elf from DOE's Savannah River Site poses with Santa Claus, who holds a bike, one of the more than 14,200 toys federal employees and contractors donated to the U.S. Marine Toys for Tots Program. Mounds of bikes and other donated toys for the program can be seen in the background.

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Faces of the Recovery Act: Jobs at Savannah River Site | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Recovery Act: Jobs at Savannah River Site the Recovery Act: Jobs at Savannah River Site Faces of the Recovery Act: Jobs at Savannah River Site October 30, 2009 - 3:35pm Addthis The Savannah River Site in Aiken, South Carolina has been able to create/save thousands of jobs through the Recovery Act. These are the stories of just a few of their new hires. Andy Oare Andy Oare Former New Media Strategist, Office of Public Affairs Hear from some of the Recovery Act hires at the Energy Department's Savannah River Site in Aiken, South Carolina. These are just a few of the jobs funded by the Recovery Act to accelerate the cleanup of the former nuclear weapons research site and make the site safe for future generations. Addthis Related Articles Deputy Secretary Poneman: Recovery Act Putting Americans to Work and

342

Oversight Scheduling and Operational Awareness at the Savannah River Site, March 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HSS Independent Activity Report - HSS Independent Activity Report - Rev. 0 Report Number: HIAR-SRS-2013-03-25 Site: Savannah River Site Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report on Oversight Scheduling and Operational Awareness at the Savannah River Site Dates of Activity : 03/25/2013 - 03/28/2013 Report Preparer: Phillip D. Aiken Activity Description/Purpose: 1. The Independent Oversight Site Lead for the Savannah River Site traveled to the site to work with functional area managers to schedule nuclear safety oversight activities. 2. The Site Lead reviewed the differing professional opinion (DPO) program at the Savannah River Operations Office (Department of Energy (DOE)-SR). Result: 1. The Site Lead scheduled a radiological program review at the National Nuclear Security Administration Savannah River

343

PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health  

NLE Websites -- All DOE Office Websites (Extended Search)

MedGate Occupational MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) PIA - Savannah River Nuclear Solution (SRNS) MedGate Occupational Health and Safety Medical System (OHS) (Includes the Drug and Alcohol Testing System (Assistant)) More Documents & Publications PIA - Savannah River Nuclear Solution (SRNS) Procurement Cycle System (PCS) PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management

344

EIS-0270: Accelerator Production of Tritium at the Savannah River Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0270: Accelerator Production of Tritium at the Savannah River EIS-0270: Accelerator Production of Tritium at the Savannah River Site EIS-0270: Accelerator Production of Tritium at the Savannah River Site Summary This EIS evaluates the potential environmental impact of a proposal to construct and operate an Accelerator for the Production of Tritium at the Savannah River Site. Public Comment Opportunities None available at this time. Documents Available for Download May 14, 1999 EIS-0288: Consolidated Record of Decision (EIS-0270 & EIS-0271) Tritium Supply and Recycling March 1, 1999 EIS-0270: Final Environmental Impact Statement Accelerator Production of Tritium at the Savannah River Site September 5, 1996 EIS-0270: Notice of Intent to Prepare an Environmental Impact Statement Construction and Operation of an Accelerator for the Production of Tritium

345

EA-1606: Proposed Use of Savannah River Site Lands for Military Training,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

06: Proposed Use of Savannah River Site Lands for Military 06: Proposed Use of Savannah River Site Lands for Military Training, South Carolina EA-1606: Proposed Use of Savannah River Site Lands for Military Training, South Carolina Summary This EA evaluates the environmental impacts of a proposal for the Department of Defense and Department of Homeland Security to use the Savannah River Site, near Aiken, South Carolina, for military training purposes. For more information, contact: Mr. Andrew R. Grainger NEPA Compliance Officer U. S. Department of Energy Savannah River Operations Office Building 730-1B, Room 3150 Aiken, SC 29808 Telephone: 803-952-8001 Fax/telephone: 1-800-881-7292 Electronic mail: nepa@srs.gov Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download

346

EM Celebrates Ribbon Cutting for New Biomass Plant at Savannah River Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Celebrates Ribbon Cutting for New Biomass Plant at Savannah Celebrates Ribbon Cutting for New Biomass Plant at Savannah River Site EM Celebrates Ribbon Cutting for New Biomass Plant at Savannah River Site March 1, 2012 - 12:00pm Addthis Pictured from left are Senior Advisor for Environmental Management David Huizenga; DOE Savannah River Operations Office Manager Dave Moody; SRNS Infrastructure Maintenance and Engineering Manager John Stafford; DOE Federal Projects Director Jim DeMass; Under Secretary for Nuclear Security Thomas D’Agostino; DOE-Savannah River Assistant Manager Karen Guevara; Ameresco Federal Programs Director Nicole Bulgarino; Ameresco Executive Vice President Keith Derrington; U.S. Rep. Joe Wilson (R-SC); Ameresco Program Manager Ken Chacey; and Ameresco President and CEO George Sakellaris.

347

Epidemiologic surveillance. Annual report for Savannah River Site  

Science Conference Proceedings (OSTI)

Epidemiologic surveillance at US Department of Energy (DOE) facilities consists of regular and systematic collection, analysis, and interpretation of data on absences due to illness and injury in the work force. Its purpose is to provide an early warning system for health problems occurring among employees at participating sites. In this annual report, the 1994 morbidity data for the Savannah River Site (SRS) are summarized. These analyses focus on absences of 5 or more consecutive workdays occurring among workers aged 16-75 years. They are arranged in five sets of tables that present: (1) the distribution of the labor force by occupational category and salary status; (2) the absences per person, diagnoses per absences, and diagnosis rates for the whole work force; (3) diagnosis rates by type of disease or injury; (4) diagnosis rates by occupational category; and (5) relative risks for specific types of disease or injury by occupational category.

NONE

1997-09-01T23:59:59.000Z

348

Qualifying Officials Designation Letter - Savannah River Operations Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOEP IUUI DOEP IUUI United States Government Department of Energy (DOE) memorandum Savannah River Operations Office (SR) DATE: REPLY TO ATTN OF: SUBJECT: NOV 3 o 2010 MGR (Moody, 2-9468) Technical Qualification Program (TQP) Qualifying Officials (QO) ro: DISTRIBUTION Each employee whose name appears on the attached listings is designated as a TQP QO. You were chosen by your supervisor because you have demonstrated an in-depth level of knowledge and abilities in the functional area or functional competency for which you are designated. As a designated TQP QO, you play a significant role in the qualification process of TQP participants and have a grave responsibility for maintaining the intent and integrity of the program. Your signature on the qualification record validates the

349

Summary - Tank 48 at the Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tank 48 Tank 48 ETR Report Date: August 2006 ETR-2 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of Tank 48 at the Savannah River Site (SRS) Why DOE-EM Did This Review Tank 48 is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system that will play a very important role in removal and processing of high-level waste (HLW) in the years ahead. However, the tank is currently isolated from the system and unavailable for use, because its contents. It contains approximately 250,000 gallons of salt solution containing Cesium-137 and other radioisotopes which are contaminated with significant quantities of tetraphenylborate (TPB), a material which

350

Principal Media Contact: DT Townsend Savannah River Nuclear Solutions, LLC  

NLE Websites -- All DOE Office Websites (Extended Search)

Registration for the 2014 SRS Registration for the 2014 SRS Public Tour Program Begins December 30 AIKEN, S.C. (Dec. 16, 2013) - Registration for the Savannah River Site's 2014 public tour program will begin Monday, Dec. 30. More than 1,000 seats will be available during 22 tours to be held throughout the upcoming year at the Department of Energy site near Aiken, S.C. Driving tours are offered each year at SRS to provide members of the public an opportunity to see many of the site's facilities and learn more about the site's history, current activities and future missions. The first of the tours will be held in January. Each tour starts at the Aiken County Applied Research Center located off Highway 278, near New Ellenton, and begins with an overview pre- sentation about SRS and a safety briefing.

351

SAVANNAH RIVER SITE COLD WAR HISTORIC PROPERTY DOCUMENTATION  

NLE Websites -- All DOE Office Websites (Extended Search)

WAR WAR HISTORIC PROPERTY DOCUMENTATION 700/A AREA Aiken County, South Carolina 6150 East Ponce de Leon Avenue Stone Mountain, Georgia 30083 700/A AREA SITE ADMINISTRATION, SAFETY, SECURITY, AND SUPPORT NEW SOUTH ASSOCIATES ii ABSTRACT This documentation was prepared in accordance with a Memorandum of Agreement (MOA) signed by the Department of Energy-Savannah River (DOE-SR) and the South Carolina Historic Preservation Office (SHPO) dated February 17, 2004, as well as the Consolidated MOA of August 2004. The MOA stipulated that a thematic study and photographic documentation be undertaken on A Area historic properties 703-A and 708-A. In addition, a Cultural Resource Management Plan was accepted and signed by DOE-SR and the SHPO on December 9, 2004 calling for documentation of the remainder

352

Savannah River Site - Tank 48 SRS Review Report  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ETR-2 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of Tank 48 at the Savannah River Site (SRS) Why DOE-EM Did This Review Tank 48 is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system that will play a very important role in removal and processing of high-level waste (HLW) in the years ahead. However, the tank is currently isolated from the system and unavailable for use, because its contents. It contains approximately 250,000 gallons of salt solution containing Cesium-137 and other radioisotopes which are contaminated with significant quantities of tetraphenylborate (TPB), a material which can release benzene vapor to the tank head space in

353

Summary - Plutonium Preparation Project at the Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Site EM Project: PuPP ETR Report Date: October 2008 ETR-17 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Plutonium Preparation Project at the Savannah River Site Why DOE-EM Did This Review The purpose of the Plutonium Preparation Project (PuPP) is to prepare for disposition of plutonium materials; for examination, re-stabilization, and disassembly of the Fast Flux Test Facility (FFTF) unirradiated fuel; and for repackaging of Pu stored in 3013 containers. Of ~12.8 MT of plutonium, ~4.1 MT will be directly transferred to the MOX Fuel Fabrication Facility (MFFF); ~3.7 MT will require processing prior to transfer to the MFFF; and ~5 MT was proposed to be processed in H-Canyon with the

354

Savannah River Site, Former Production Workers Screening Projects |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site, Former Production Workers Screening Projects Site, Former Production Workers Screening Projects Savannah River Site, Former Production Workers Screening Projects Project Name: National Supplemental Screening Program Covered DOE Site: SRS Worker Population Served: Production Workers Principal Investigator: Donna Cragle, PhD Toll-free Telephone: (866) 812-6703 Website: http://www.orau.org/nssp/ This project is conducted by the Oak Ridge Associated Universities (ORAU), as a component of its National Supplemental Screening Program. ORAU has teamed with its partners, Comprehensive Health Services, National Jewish Health, the University of Colorado Denver, and Axion Health, to run the program. Construction Worker Screening Projects Construction Worker Projects, Former Worker Medical Screening Program (FWP)

355

Enforcement Letter-Savannah River-03/29/2000  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Mr. Joseph J. Buggy, President [ ] Building 703-A Road 1 Aiken, SC 29802 Subject: Enforcement Letter (NTS-SR-WSRC-ESH-1999-0002) Dear Mr. Buggy: This letter refers to the Department of Energy's (DOE) evaluation of the facts and circumstances concerning the referenced Noncompliance Tracking System (NTS) Report which describes the failure to properly retrain portions of the Westinghouse Savannah River Company (WSRC) nonradiological workforce with General Employee Radiological Training (GERT) and the failure to provide such training to all temporary visitors and individuals badged at other DOE locations. These deficiencies were identified by the WSRC Price-Anderson Coordinator in a 10 CFR 835 assessment. The deficiencies identified were noncompliances with the following requirements:

356

HyTech - The Hydrogen Technology Laboratory at Savannah River  

DOE Green Energy (OSTI)

SRS recently announced the formation of the Hydrogen Technology Laboratory (HyTech) to work with industry and government in developing technologies based on the site`s four decades of experience with tritium and other forms of H. HyTech will continue to sustain the site`s ongoing role in H technology applications for defense programs. In addition, the laboratory will work with the chemical, transportation, power, medical, and other industries to develop and test related technologies. HyTech, which is located in the Savannah River Technology Center, will make use of its facilities and staff, as well as the infrastructure within the site`s Tritium Facilities. More than 80 SRS scientists, engineers, and technical professionals with backgrounds in chemistry, engineering, materials science, metallurgy, physics, and computer science will work with the laboratory. This paper describes some of HyTech`s current initiatives in the area of H storage, transportation, and energy applications.

Motyka, T.; Knight, J.R.; Heung, L.K.; Lee, M.W.

1995-12-31T23:59:59.000Z

357

Implementation of ISO140001 at the Savannah River Site  

SciTech Connect

The Department of Energy`s Savannah River Site (SRS) in Aiken, SC recently received ISO14001 certification. ISO14001 is an internationally recognized standard that delineates the elements of an effective environmental management system (EMS) and enhances environmental stewardship. SRS preparations for ISO14001 certification involved a comparison of existing programs to the requirements of the standard. Gaps in the program were identified and work initiated to fill those gaps. Primarily, these deficiencies were related to documentation of the SRS EMS and employee training. Certification was granted after an extensive review by a team of independent auditors. The review included personnel interviews, documentation reviews, and work practice observations. An overview of the preparation process as well as the independent review will be presented.

Marra, S.L. [Westinghouse Savannah River Company, AIKEN, SC (United States); Reeves, R.D.

1998-04-20T23:59:59.000Z

358

Savannah River Site's Site Specific Plan  

SciTech Connect

This Site Specific Plan (SSP) has been prepared by the Savannah River Site (SRS) in order to show the Environmental Restoration and Waste Management activities that were identified during the preparation of the Department of Energy-Headquarters (DOE-HQ) Environmental Restoration and Waste Management Five-Year Plan (FYP) for FY 1992--1996. The SSP has been prepared in accordance with guidance received from DOE-HQ. DOE-SR is accountable to DOE-HQ for the implementation of this plan. The purpose of the SSP is to develop a baseline for policy, budget, and schedules for the DOE Environmental Restoration and Waste Management activities. The plan explains accomplishments since the Fiscal Year (FY) 1990 plan, demonstrates how present and future activities are prioritized, identifies currently funded activities and activities that are planned to be funded in the upcoming fiscal year, and describes future activities that SRS is considering.

1991-08-01T23:59:59.000Z

359

Savannah River Site environmental implementation plan. Volume 1, Executive summary  

SciTech Connect

Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

1989-08-01T23:59:59.000Z

360

Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs  

SciTech Connect

Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

1989-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Principal Media Contact: DT Townsend Savannah River Nuclear Solutions, LLC  

NLE Websites -- All DOE Office Websites (Extended Search)

Over 7,000 Area Students Attend College Night 2013 Over 7,000 Area Students Attend College Night 2013 Greatly exceeds last year's attendance as $15,000 in scholarships were awarded to area students AAiken, S.C., (Sept. 13, 2013) - Over 7,000 high school students and educators from the greater Aiken-Augusta area recently met with recruiters from more than 150 colleges and universi- ties during this year's CSRA College Night. "We were thrilled with this year's attendance," said Gladys Moore, Program Coordinator, Savannah River Nuclear Solutions, LLC (SRNS). "We broke last year's attendance by more than one thousand students. At times, the arena was packed, wall to wall, with enthusiastic students eager to obtain much needed information." A large number of College Night volun- teers are employees working at the U.S.

362

Nuclear Material Processing at the Savannah River Site  

Science Conference Proceedings (OSTI)

Plutonium production for national defense began at Savannah River in the mid-1950s, following construction of production reactors and separations facilities. Following the successful completion of its production mission, the site`s nuclear material processing facilities continue to operate to perform stabilization of excess materials and potentially support the disposition of these materials. A number of restoration and productivity improvement projects implemented in the 1980s, totaling nearly a billion dollars, have resulted in these facilities representing the most modern and only remaining operating large-scale processing facilities in the DOE Complex. Together with the Site`s extensive nuclear infrastructure, and integrated waste management system, SRS is the only DOE site with the capability and mission of ongoing processing operations.

Severynse, T.F. [Westinghouse Savannah River Company, AIKEN, SC (United States)

1998-07-01T23:59:59.000Z

363

TESTING OF THE RADBALL TECHNOLOGY AT SAVANNAH RIVER NATIONAL LABORATORY  

SciTech Connect

The United Kingdom's National Nuclear Laboratory (NNL) has developed a remote, nonelectrical, radiation-mapping device known as RadBall (patent pending), which offers a means to locate and quantify radiation hazards and sources within contaminated areas of the nuclear industry. Positive results from initial deployment trials in nuclear waste reprocessing plants at Sellafield in the United Kingdom and the anticipated future potential use of RadBall throughout the U.S. Department of Energy Complex have led to the NNL partnering with the Savannah River National Laboratory (SRNL) to further test, underpin, and strengthen the technical performance of the technology. The study completed at SRNL addresses key aspects of the testing of the RadBall technology. The first set of tests was performed at Savannah River Nuclear Solutions Health Physics Instrument Calibration Laboratory (HPICL) using various gamma-ray sources and an x-ray machine with known radiological characteristics. The objective of these preliminary tests was to identify the optimal dose and collimator thickness. The second set of tests involved a highly contaminated hot cell. The objective of this testing was to characterize a hot cell with unknown radiation sources. The RadBall calibration experiments and hot cell deployment were successful in that for each trial radiation tracks were visible. The deployment of RadBall can be accomplished in different ways depending on the size and characteristics of the contaminated area (e.g., a hot cell that already has a crane/manipulator available or highly contaminated room that requires the use of a remote control device with sensor and video equipment to position RadBall). This report also presents SRNL-designed RadBall accessories for future RadBall deployment (a harness, PODS, and robot).

Farfan, E.; Foley, T.

2010-02-10T23:59:59.000Z

364

Summary - Savannah River Site Tank 48H Waste Treatment Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

S S Wet Air Savan contain liquid w contain potent to the option tank w Bed S condu be pur The as Techn Techn as liste * W o o The Ele Site: S roject: S P Report Date: J ited States Savanna Why DOE r Oxidation Proc nnah River Tan ning approxima waste. The wa ns tetraphenylb tially flammable tank head spa s have been id waste: Wet Air O team Reformin cted to aid in d rsued for treatin What th ssessment team ology Element ology Readine ed below: Wet Air Oxidatio Reactor sys Offgas Trea To view the full T http://www.em.doe. objective of a Tech ements (CTEs), usin Savannah Rive SRS Tank 48H Project July 2007 Departmen ah River E-EM Did This cess k 48H is a 1.3 ately 250, 000 aste is a salt so borate (TPB), w e concentration ce. Two poten dentified for this Oxidation (WAO ng (FBSR). Th deciding which ng the Tank 48

365

Intensive archaeological survey of the proposed Savannah River Ecology Laboratory Conference Center and Educational Facility, Savannah River Site, Aiken County, South Carolina  

Science Conference Proceedings (OSTI)

Documented in this report are the methods and results of an intensive archaeological survey for the proposed University of Georgia Savannah River Ecology Laboratory (SREL) Conference Center and Educational Facility on the DOE Savannah River Site (SRS). Archaeological investigations conducted by the Savannah River Archaeological Research Program (SRARP) on the 70-acre project area and associated rights-of-way consisted of subsurface testing at two previously recorded sites and the discovery of one previously unrecorded site. The results show that 2 sites contain archaeological remains that may yield significant information about human occupations in the Aiken Plateau and are therefore considered eligible for nomination to the National Register of Historic Places. Adverse impacts to these sites can be mitigated through avoidance.

Stephenson, K.; Crass, D.C.; Sassaman, K.E.

1993-02-01T23:59:59.000Z

366

COLLOQUIUM - NOTE SPECIAL TIME OF 3:15PM: Savannah River National  

NLE Websites -- All DOE Office Websites (Extended Search)

May 15, 2013, 3:15pm to 5:30pm May 15, 2013, 3:15pm to 5:30pm Colloquia MBG Auditorium COLLOQUIUM - NOTE SPECIAL TIME OF 3:15PM: Savannah River National Laboratory: Underpinning Critical National Missions Dr. Jeff Griffin Savannah River National Laboratory The Cold War mission of the Savannah River Site in South Carolina was to produce nuclear materials for the national defense. Since the Cold War ended, SRS has continued to ensure United States national and energy security while cleaning up the environmental legacy from nuclear materials production. Throughout the history of SRS, the Savannah River National Laboratory has developed the processes to successfully accomplish the site's missions. SRNL is a multi-program laboratory dedicated to addressing the nation's present and future challenges in National Security, Clean Energy, and

367

Audit of Groundwater Remediation Plans at Savannah River, ER-B-96-02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF GROUNDWATER REMEDIATION PLANS AT THE SAVANNAH RIVER SITE The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible.

368

Progress Continues Toward Closure of Two Underground Waste Tanks at Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE))

AIKEN, S.C. – The EM program at the Savannah River Site (SRS) is filling two radioactive liquid waste tanks with a cement-like grout in an effort to operationally close them this fall.

369

U. S. Department of Energy Savannah River Operations Office - DOE-SR News  

NLE Websites -- All DOE Office Websites (Extended Search)

Release Archive Release Archive DOE-SR News Release Archive 2012 News Releases Savannah River Site Reaches Significant Milestone with Waste Tank Closure SR-2012-06 Adobe Acrobat PDF DOE to Extend Savannah River Nuclear Solutions Contract at Savannah River Site to September 2016 SR-2012-05 Adobe Acrobat PDF Savannah River Site Federal Employees Volunteer for United Way Campaign SR-2012-04 Adobe Acrobat PDF Installation of Six Large Process Tanks Mark Big Step in Construction of Critical Waste Cleanup Facility at SRS SR-2012-03 Adobe Acrobat PDF Grouting Begins on First SRS Waste Tanks Since 1997 SR-2012-02 Adobe Acrobat PDF SRS Marks Successful Operational Startup of New Biomass Cogeneration Facility SR-2012-01 Adobe Acrobat PDF 2011 News Releases Recovery Act Funds Test Reactor Dome Removal in Historic D&D Project

370

Faces of the Recovery Act: Jobs at Savannah River Site | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Jobs at Savannah River Site Jobs at Savannah River Site Faces of the Recovery Act: Jobs at Savannah River Site Addthis Description The Savannah River Site in Aiken, SC has been able to create/save thousands of jobs through the Recovery Act. These are the stories of just a few of the new hires. Speakers Skila Harris, Doug Clark, Bill Picciano, Kelli Culpepper, Nancy Cole, Duration 5:08 Topic Recovery Act Waste Management Nuclear Security & Safety Credit Energy Department Video SKILA HARRIS: We understand the health risks associated with radioactivity much better today than we did 50 years ago. And at the sites where this country was developing its weapons, we were not responsible in how we handled those materials. The recovery act has allowed us to accelerate the clean-up, hire a lot more people so we can

371

Major Cold War Cleanup Milestone Reached at the Savannah River Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Major Cold War Cleanup Milestone Reached at the Savannah River Site Major Cold War Cleanup Milestone Reached at the Savannah River Site Major Cold War Cleanup Milestone Reached at the Savannah River Site March 29, 2012 - 10:37am Addthis WASHINGTON, DC - Today, the Energy Department announced it has reached a major milestone in the Department's efforts to clean up the Cold War legacy at the Savannah River Site (SRS) in South Carolina, laying the groundwork for closing two underground storage tanks that previously held radioactive liquid waste from nuclear weapons production at SRS. The determination signed by Energy Secretary Steven Chu paves the way for SRS to begin closing the massive tanks that make up the F Tank Farm. The site will start this year by closing two tanks that pose the greatest risk to the environment - Tanks 18 and 19. These tank closures will be the first

372

Savannah River Site Land Use Plan - May, 2013 i SRNS-RP-2013-00162  

NLE Websites -- All DOE Office Websites (Extended Search)

Savannah River Site Land Use Plan - May, 2013 i Savannah River Site Land Use Plan - May, 2013 i SRNS-RP-2013-00162 Savannah River Site Land Use Plan - May, 2013 i Table of Contents 1.0 - Purpose p1 2.0 - Executive Summary p1 3.0 - SRS Land Use Overview p5 Assumptions Current Land Use Leases, Transfers and Other Land Use Actions Future Land Use Land Use Issues 4.0 - Land Use Planning and Control for Existing Missions p13 Cleanup, Production and Support Missions Natural and Cultural Resource Management 5.0 - Process for Future Land Use Changes p15 Introduction Process Overview Process Description 6.0 - Summary p19 7.0 - References p20 8.0 - Acronyms p21 Savannah River Site Land Use Plan - May, 2013 i

373

U. S. Department of Energy Savannah River Operations Office - DOE-SR News  

NLE Websites -- All DOE Office Websites (Extended Search)

Releases Releases DOE-SR News Releases GROUTING TO BEGIN TOMORROW ON TWO ADDITIONAL SRS WASTE TANKS SR-2013-08 Adobe Acrobat PDF PARSONS' SALT WASTE PROCESSING FACILITY PROJECT EARNS DOE VOLUNTARY PROTECTION PROGRAM MERIT AWARD SR-2013-07 Adobe Acrobat PDF Public Comment Sought for Savannah River Site Workforce Restructuring Plan SR-2013-06 Adobe Acrobat PDF Savannah River Site Citizens Advisory Board Seeking New Members SR-2013-05 Adobe Acrobat PDF Salt Waste Processing Facility: New Leadership SR-2013-04 Adobe Acrobat PDF Savannah River Site Exceeds Waste Shipment Goals SR-2013-03 Adobe Acrobat PDF Savannah River Operations Office Honors Federal Manager of the Year SR-2013-02 Adobe Acrobat PDF SRS Advisory Board to Hold Augusta Public Meeting March 25-26 SR-2013-01 Adobe Acrobat PDF

374

Major Cold War Cleanup Milestone Reached at the Savannah River Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Major Cold War Cleanup Milestone Reached at the Savannah River Site Major Cold War Cleanup Milestone Reached at the Savannah River Site Major Cold War Cleanup Milestone Reached at the Savannah River Site March 29, 2012 - 10:37am Addthis WASHINGTON, DC - Today, the Energy Department announced it has reached a major milestone in the Department's efforts to clean up the Cold War legacy at the Savannah River Site (SRS) in South Carolina, laying the groundwork for closing two underground storage tanks that previously held radioactive liquid waste from nuclear weapons production at SRS. The determination signed by Energy Secretary Steven Chu paves the way for SRS to begin closing the massive tanks that make up the F Tank Farm. The site will start this year by closing two tanks that pose the greatest risk to the environment - Tanks 18 and 19. These tank closures will be the first

375

Fuel performance comparison between Savannah River reactors and the US commercial nuclear reactors  

SciTech Connect

This document provides a review of fuel/target performance of the Savannah River Reactors which was made to compare their in-core performance with that of the commercial nuclear reactors in the US.

Paik, I.K.; Ellison, P.G.

1989-01-01T23:59:59.000Z

376

Actinide-soil interactions in waste management at the Savannah River Plant  

SciTech Connect

Three aspects of the transuranium (TRU) nuclide-soil interaction were studied in connection with Savannah River Plant (SRP) burial ground operations. Results of the studies are reported as three separate parts of this report. (auth)

Holcomb, H.P.; Horton, J.H.; Wilhite, E.L.

1976-01-01T23:59:59.000Z

377

Savannah River Site Basis for Section 3116 Determination for Salt Waste Disposal  

Energy.gov (U.S. Department of Energy (DOE))

The Department of Energy (DOE) published in the Federal Register (January 24, 2006), a Notice of Availability of Section 3116 Determination for Salt Waste Disposal at the Savannah River Site.

378

Savannah River Site Experiences in In Situ Field Measurements of Radioactive Materials  

Science Conference Proceedings (OSTI)

This paper discusses some of the field gamma-ray measurements made at the Savannah River Site, the equipment used for the measurements, and lessons learned during in situ identification and characterization of radioactive materials.

Moore, F.S.

1999-10-07T23:59:59.000Z

379

Site Selection for Concrete Batch Plant to Support Plutonium Disposition Facilities at the Savannah River Site  

Science Conference Proceedings (OSTI)

WSRC conducted a site selection study to identify, assess, and rank candidate sites for an onsite concrete batch plant at the Savannah River Site in the vicinity of F-Area.

Wike, L.D.

2001-06-15T23:59:59.000Z

380

Cross borehole induced polarization to detect subsurface NAPL at the Savannah River Site, South Carolina  

E-Print Network (OSTI)

Spectral induced polarization measurements were acquired in six cross-borehole panels within four boreholes at the Savannah River Site. The investigation was performed to delineate the presence of dense non-aqueous phase ...

Lambert, Michael B. (Michael Brian), 1980-

2003-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Small Column Ion Exchange Technology at Savannah River Site | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Small Column Ion Exchange Technology at Savannah River Site Small Column Ion Exchange Technology at Savannah River Site Small Column Ion Exchange Technology at Savannah River Site The Small Column Ion Exchange (SCIX) system being developed for deployment at the Savannah River Site (SRS) is a supplementary salt waste processing technology that, if implemented, will augment the baseline Salt Waste Processing Facility (SWPF) capability. An opportunity exists to shorten the SRS radioactive waste system lifecycle by 6 years, and significantly reduce life cycle costs, by accelerating salt processing to earlier completion, simultaneous with sludge vitrification. As described in the Enhanced Tank Waste Strategy, which is part of the Department of Energy (DOE) Office of Environmental Management (EM) Roadmap - EM Journey to Excellence,

382

Savannah River Site Retires Coal-Fired D-Area Powerhouse after Nearly 60  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Retires Coal-Fired D-Area Powerhouse after Savannah River Site Retires Coal-Fired D-Area Powerhouse after Nearly 60 Years of Service Savannah River Site Retires Coal-Fired D-Area Powerhouse after Nearly 60 Years of Service May 1, 2012 - 12:00pm Addthis SRNS Maintenance Supervisor Steve Cooper, left to right, Control Room Operator Robert Dicks, and Deputy Operations Manager Ren Hatfield stand near a boiler unit of the DArea powerhouse. The three workers have a combined experience of 83 years at the facility. SRNS Maintenance Supervisor Steve Cooper, left to right, Control Room Operator Robert Dicks, and Deputy Operations Manager Ren Hatfield stand near a boiler unit of the DArea powerhouse. The three workers have a combined experience of 83 years at the facility. AIKEN, S.C. - The Savannah River Site (SRS) has shut down the massive,

383

The Cold and Dark Process at the Savannah River Site  

SciTech Connect

The deactivation and decommissioning (D and D) of a facility exposes D and D workers to numerous hazards. One of the more serious hazards is coming into contact to hazardous energy sources (e.g. electrical, pressurized steam). At the Savannah River Site (SRS) a formal process for identifying and eliminating sources of hazardous energy was developed and is called 'Cold and Dark'. Several 'near miss' events involving cutting of energized conductors during D and D work in buildings thought to be isolated identified the need to have a formal process to identify and isolate these potentially hazardous systems. This process was developed using lessons learned from D and D activities at the Rocky Flats Environmental Technology Site (Rocky Flats) in Colorado. The Cold and Dark process defines an isolation boundary (usually a building perimeter) and then systematically identifies all of the penetrations through this boundary. All penetrations that involve hazardous energy sources are then physically air-gapped. The final product is a documented declaration of isolation performed by a team involving operations, engineering, and project management. Once the Cold and Dark declaration is made for a building work can proceed without the usual controls used in an operational facility (e.g. lockout/tag-out, arc flash PPE). It is important to note that the Cold and Dark process does not remove all hazards from a facility. Work planning and controls still need to address hazards that can be present from such things as chemicals, radiological contamination, residual liquids, etc., as well as standard industrial hazards. Savannah River Site experienced 6 electrical events prior to declaring a facility 'cold and dark' and has had zero electrical events after 'cold and dark' declaration (263 facilities to date). The formal Cold and Dark process developed at SRS has eliminated D and D worker exposures to hazardous energy sources. Since the implementation of the process there have been no incidents involving energized conductors or pressurized liquids/gases. During this time SRS has demolished over 200 facilities. The ability to perform intrusive D and D activities without the normal controls such as lock outs results in shorter schedule durations and lower overall costs for a facility D and D.

Gilmour, John C. [CH2SRC, Savannah River Site, Aiken, SC 29808 (United States); Willis, Michael L. [Washington Savannah River Company, Aiken, SC 29808 (United States)

2008-01-15T23:59:59.000Z

384

HYDROGEN TECHNOLOGY RESEARCH AT THE SAVANNAH RIVER NATIONAL LABORATORY  

DOE Green Energy (OSTI)

The Savannah River National Laboratory (SRNL) is a U.S. Department of Energy research and development laboratory located at the Savannah River Site (SRS) near Aiken, South Carolina. SRNL has over 50 years of experience in developing and applying hydrogen technology, both through its national defense activities as well as through its recent activities with the DOE Hydrogen Programs. The hydrogen technical staff at SRNL comprises over 90 scientists, engineers and technologists, and it is believed to be the largest such staff in the U.S. SRNL has ongoing R&D initiatives in a variety of hydrogen storage areas, including metal hydrides, complex hydrides, chemical hydrides and carbon nanotubes. SRNL has over 25 years of experience in metal hydrides and solid-state hydrogen storage research, development and demonstration. As part of its defense mission at SRS, SRNL developed, designed, demonstrated and provides ongoing technical support for the largest hydrogen processing facility in the world based on the integrated use of metal hydrides for hydrogen storage, separation, and compression. The SRNL has been active in teaming with academic and industrial partners to advance hydrogen technology. A primary focus of SRNL's R&D has been hydrogen storage using metal and complex hydrides. SRNL and its Hydrogen Technology Research Laboratory have been very successful in leveraging their defense infrastructure, capabilities and investments to help solve this country's energy problems. SRNL has participated in projects to convert public transit and utility vehicles for operation using hydrogen fuel. Two major projects include the H2Fuel Bus and an Industrial Fuel Cell Vehicle (IFCV) also known as the GATOR{trademark}. Both of these projects were funded by DOE and cost shared by industry. These are discussed further in Section 3.0, Demonstration Projects. In addition to metal hydrides technology, the SRNL Hydrogen group has done extensive R&D in other hydrogen technologies, including membrane filters for H2 separation, doped carbon nanotubes, storage vessel design and optimization, chemical hydrides, hydrogen compressors and hydrogen production using nuclear energy. Several of these are discussed further in Section 2, SRNL Hydrogen Research and Development.

Danko, E

2009-03-02T23:59:59.000Z

385

A COMPARISON OF HANFORD AND SAVANNAH RIVER SITE HIGH-LEVEL WASTES  

SciTech Connect

This study is a simple comparison of high-level waste from plutonium production stored in tanks at the Hanford and Savannah River sites. Savannah River principally used the PUREX process for plutonium separation. Hanford used the PUREX, Bismuth Phosphate, and REDOX processes, and reprocessed many wastes for recovery of uranium and fission products. Thus, Hanford has 55 distinct waste types, only 17 of which could be at Savannah River. While Hanford and Savannah River wastes both have high concentrations of sodium nitrate, caustic, iron, and aluminum, Hanford wastes have higher concentrations of several key constituents. The factors by which average concentrations are higher in Hanford salt waste than in Savannah River waste are 67 for {sup 241}Am, 4 for aluminum, 18 for chromium, 10 for fluoride, 8 for phosphate, 6 for potassium, and 2 for sulfate. The factors by which average concentrations are higher in Hanford sludges than in Savannah River sludges are 3 for chromium, 19 for fluoride, 67 for phosphate, and 6 for zirconium. Waste composition differences must be considered before a waste processing method is selected: A method may be applicable to one site but not to the other.

HILL RC PHILIP; REYNOLDS JG; RUTLAND PL

2011-02-23T23:59:59.000Z

386

THE COLD AND DARK PROCESS AT THE SAVANNAH RIVER SITE  

Science Conference Proceedings (OSTI)

The deactivation and decommissioning (D&D) of a facility exposes D&D workers to numerous hazards. One of the more serious hazards is coming into contact to hazardous energy sources (e.g. electrical, pressurized steam). At the Savannah River Site (SRS) a formal process for identifying and eliminating sources of hazardous energy was developed and is called ''Cold & Dark''. Several ''near miss'' events involving cutting of energized conductors during D&D work in buildings thought to be isolated identified the need to have a formal process to identify and isolate these potentially hazardous systems. This process was developed using lessons learned from D&D activities at the Rocky Flats Environmental Technology Site (Rocky Flats) in Colorado. The Cold & Dark process defines an isolation boundary (usually a building perimeter) and then systematically identifies all of the penetrations through this boundary. All penetrations that involve hazardous energy sources are then physically air-gapped. The final product is a documented declaration of isolation performed by a team involving operations, engineering, and project management. Once the Cold & Dark declaration is made for a building work can proceed without the usual controls used in an operational facility (e.g. lockout/tagout, arc flash PPE). It is important to note that the Cold & Dark process does not remove all hazards from a facility. Work planning and controls still need to address hazards that can be present from such things as chemicals, radiological contamination, residual liquids, etc., as well as standard industrial hazards.

Gilmour, J; William Austin, W; Cathy Sizemore, C

2007-01-31T23:59:59.000Z

387

Application of UAVs at the Savannah River Site  

SciTech Connect

Small, unmanned aerial vehicles (UAVs) equipped with sensors for physical, chemical, and radiochemical measurements of remote environments have been tested at the Savannah River Site (SRS). A miniature helicopter was used as an aerial platform for testing a variety of sensors with outputs integrated with the flight control system for real-time data acquisition and evaluation. The sensors included a precision magnetometer, two broad band infra-red radiometers, a 1-inch by 1-inch Nal(TI) scintillation detector, and an on-board color video camera. Included in the avionics package was an ultrasonic altimeter, a precision barometer, and a portable Global Positioning System. Two separate demonstration locations at SRS were flown that had been previously characterized by careful sampling and analyses and by aerial surveys at high altitudes. The Steed Pond demonstration site contains elevated levels of uranium in the soil and pond silt due to runoff from one of the site`s uranium fuel and target production areas. The soil at the other site is contaminated with oil bearing materials and contains some buried objects. The results and limitations of the UAV surveys are presented and improvements for future measurements are discussed.

Hofstetter, K.J.; Pendergast, M.M.

1996-08-01T23:59:59.000Z

388

Environmental data management system at the Savannah River Site  

SciTech Connect

The volume and complexity of data associated with escalating environmental regulations has prompted professionals at the Savannah River Site to begin taking steps necessary to better manage environmental information. This paper describes a plan to implement an integrated environmental information system at the site. Nine topic areas have been identified. They are: administrative, air, audit & QA, chemical information/inventory, ecology, environmental education, groundwater, solid/hazardous waste, and surface water. Identification of environmental databases that currently exist, integration into a ``friendly environment,`` and development of new applications will all take place as a result of this effort. New applications recently completed include Groundwater Well Construction, NPDES (Surface Water) Discharge Monitoring, RCRA Quarterly Reporting, and Material Safety Data Sheet Information. Database applications are relational (Oracle RDBMS) and reside largely in DEC VMS environments. In today`s regulatory and litigation climate, the site recognizes they must have knowledge of accurate environmental data at the earliest possible time. Implementation of this system will help ensure this.

Story, C.H.; Gordon, D.E.

1989-12-31T23:59:59.000Z

389

Environmental data management system at the Savannah River Site  

SciTech Connect

The volume and complexity of data associated with escalating environmental regulations has prompted professionals at the Savannah River Site to begin taking steps necessary to better manage environmental information. This paper describes a plan to implement an integrated environmental information system at the site. Nine topic areas have been identified. They are: administrative, air, audit QA, chemical information/inventory, ecology, environmental education, groundwater, solid/hazardous waste, and surface water. Identification of environmental databases that currently exist, integration into a friendly environment,'' and development of new applications will all take place as a result of this effort. New applications recently completed include Groundwater Well Construction, NPDES (Surface Water) Discharge Monitoring, RCRA Quarterly Reporting, and Material Safety Data Sheet Information. Database applications are relational (Oracle RDBMS) and reside largely in DEC VMS environments. In today's regulatory and litigation climate, the site recognizes they must have knowledge of accurate environmental data at the earliest possible time. Implementation of this system will help ensure this.

Story, C.H.; Gordon, D.E.

1989-01-01T23:59:59.000Z

390

Tritium in the Savannah River Site environment. Revision 1  

Science Conference Proceedings (OSTI)

Tritium is released to the environment from many of the operations at the Savannah River Site. The releases from each facility to the atmosphere and to the soil and streams, both from normal operations and inadvertent releases, over the period of operation from the early 1950s through 1988 are presented. The fate of the tritium released is evaluated through environmental monitoring, special studies, and modeling. It is concluded that approximately 91% of the tritium remaining after decay is now in the oceans. A dose and risk assessment to the population around the site is presented. It is concluded that about 0.6 fatal cancers may be associated with the tritium released during all the years of operation to the population of about 625,000. This same population (based on the overall US cancer statistics) is expected to experience about 105,000 cancer fatalities from all types of cancer. Therefore, it is considered unlikely that a relationship between any of the cancer deaths occurring in this population and releases of tritium from the SRS will be found.

Murphy, C.E. Jr.; Bauer, L.R.; Hayes, D.W.; Marter, W.L.; Zeigler, C.C.; Stephenson, D.E.; Hoel, D.D.; Hamby, D.M.

1991-05-01T23:59:59.000Z

391

Assessment of strontium in the Savannah River Site environment  

Science Conference Proceedings (OSTI)

This document on strontium is published as a part of the Radiological Assessment Program (RAP). It is the sixth in a series of eight documents on individual radioisotopes released to the environment as a result of SRS (Savannah River Site) operations. Strontium exists in the environment as a result of above-ground nuclear weapons tests, the Chernobyl accident, the destruction of satellite Cosmos 954, small releases from reactors and reprocessing plants, and the operation of industrial, medical, and educational facilities. Strontium has been produced at SRS during the operation of 5 production reactors. About 300 curies of radiostrontium were released into streams in the late 50s and 60s, primarily from leaking fuel elements in reactor storage basins. Smaller quantities were released from the fuel reprocessing operations. About 400 Ci were released to seepage basins. A much smaller quantity, about 2 Ci, was released to the atmosphere. The overall radiological impact of SRS releases on the offsite maximum individual can be characterized by total doses of 6.2 mrem (atmospheric) and 1.4 mrem (liquid), compared with a dose of 12,960 mrem from non-SRS sources during the same period of time. Radiostrontium releases have resulted in a negligible risk to the environment and the population it supports.

Carlton, W.H.; Evans, A.G.; Geary, L.A.; Murphy, C.E. Jr.; Strom, R.N.

1992-12-31T23:59:59.000Z

392

Seismic response analyses for reactor facilities at Savannah River  

Science Conference Proceedings (OSTI)

The reactor facilities at the Savannah River Plant (SRP) were designed during the 1950's. The original seismic criteria defining the input ground motion was 0.1 G with UBC (uniform building code) provisions used to evaluate structural seismic loads. Later ground motion criteria have defined the free field seismic motion with a 0.2 G ZPA (free field acceleration) and various spectral shapes. The spectral shapes have included the Housner spectra, a site specific spectra, and the US NRC (Nuclear Regulatory Commission) Reg. Guide 1.60 shape. The development of these free field seismic criteria are discussed in the paper. The more recent seismic analyses have been of the following type: fixed base response spectra, frequency independent lumped parameter soil/structure interaction (SSI), frequency dependent lumped parameter SSI, and current state of the art analyses using computer codes such as SASSI. The results from these computations consist of structural loads and floor response spectra (used for piping and equipment qualification). These results are compared in the paper and the methods used to validate the results are discussed. 14 refs., 11 figs.

Miller, C.A. Costantino, C.J. (City Univ. of New York, NY (USA)); Xu, J. (Brookhaven National Lab., Upton, NY (USA))

1991-01-01T23:59:59.000Z

393

Reprocessing of nuclear fuels at the Savannah River Plant  

Science Conference Proceedings (OSTI)

For more than 30 years, the Savannah River Plant (SRP) has been a major supplier of nuclear materials such as plutonium-239 and tritium-3 for nuclear and thermonuclear weapons, plutonium-238 for space exploration, and isotopes of americium, curium, and californium for use in the nuclear research community. SRP is a complete nuclear park, providing most of the processes in the nuclear fuel cycle. Key processes involve fabrication and cladding of the nuclear fuel, target, and control assemblies; rework of heavy water for use as reactor moderator; reactor loading, operation, and unloading; chemical recovery of the reactor transmutation products and spent fuels; and management of the gaseous, liquid, and solid nuclear and chemical wastes; plus a host of support operations. The site's history and the key processes from fabrication of reactor fuels and targets to finishing of virgin plutonium for use in the nuclear weapons complex are reviewed. Emphasis has been given to the chemistry of the recovery and purification of weapons grade plutonium from irradiated reactor targets.

Gray, L.W.

1986-10-04T23:59:59.000Z

394

MOX Lead Assembly Fabrication at the Savannah River Site  

SciTech Connect

The U. S. Department of Energy (DOE) announced its intent to prepare an Environmental Impact Statement (EIS) under the National Environmental Policy Act (NEPA) on the disposition of the nations weapon-usable surplus plutonium.This EIS is tiered from the Storage and Disposition of Weapons-Usable Fissile Material Programmatic Environmental Impact Statement issued in December 1996,and the associated Record of Decision issued on January, 1997. The EIS will examine reasonable alternatives and potential environmental impacts for the proposed siting, construction, and operation of three types of facilities for plutonium disposition. The three types of facilities are: a pit disassembly and conversion facility, a facility to immobilize surplus plutonium in a glass or ceramic form for disposition, and a facility to fabricate plutonium oxide into mixed oxide (MOX) fuel.As an integral part of the surplus plutonium program, Oak Ridge National Laboratory (ORNL) was tasked by the DOE Office of Fissile Material Disposition(MD) as the technical lead to organize and evaluate existing facilities in the DOE complex which may meet MD`s need for a domestic MOX fuel fabrication demonstration facility. The Lead Assembly (LA) facility is to produce 1 MT of usable test fuel per year for three years. The Savannah River Site (SRS) as the only operating plutonium processing site in the DOE complex, proposes two options to carry out the fabrication of MOX fuel lead test assemblies: an all Category I facility option and a combined Category I and non-Category I facilities option.

Geddes, R.L. [Westinghouse Savannah River Company, AIKEN, SC (United States); Spiker, D.L.; Poon, A.P.

1997-12-01T23:59:59.000Z

395

U.S. DEPARTMENT OF ENERGY * SAVANNAH RIVER ...  

NLE Websites -- All DOE Office Websites (Extended Search)

sites, such as Paducah, Portsmouth, Pinellas, Ashtabula, Fernald, Mound and Kansas City Plant, and larger sites such as Oak Ridge, Los Alamos, Lawrence Livermore and Savannah...

396

Explosions and other uncontrolled chemical reactions at non-reactor nuclear facilities of the Savannah River Plant  

Science Conference Proceedings (OSTI)

This paper describes five energetic reactions (explosions) that have occurred at the Savannah River Plant non-reactor nuclear facilities. 1 fig.

Durant, W.S.; Gray, L.W.; Wallace, R.M.; Yau, W.W.F.

1988-01-01T23:59:59.000Z

397

PLUTONIUM SOLUBILITY IN SIMULATED SAVANNAH RIVER SITE WASTE SOLUTIONS  

Science Conference Proceedings (OSTI)

To address the accelerated disposition of the supernate and salt portions of Savannah River Site (SRS) high level waste (HLW), solubility experiments were performed to develop a predictive capability for plutonium (Pu) solubility. A statistically designed experiment was used to measure the solubility of Pu in simulated solutions with salt concentrations and temperatures which bounded those observed in SRS HLW solutions. Constituents of the simulated waste solutions included: hydroxide (OH{sup -}), aluminate (Al(OH){sub 4}{sup -}), sulfate (SO{sub 4}{sup 2-}), carbonate (CO{sub 3}{sup 2-}), nitrate (NO{sub 3}{sup -}), and nitrite (NO{sub 2}{sup -}) anions. Each anion was added to the waste solution in the sodium form. The solubilities were measured at 25 and 80 C. Five sets of samples were analyzed over a six month period and a partial sample set was analyzed after nominally fifteen months of equilibration. No discernable time dependence of the measured Pu concentrations was observed except for two salt solutions equilibrated at 80 C which contained OH{sup -} concentrations >5 mol/L. In these solutions, the Pu solubility increased with time. This observation was attributed to the air oxidation of a portion of the Pu from Pu(IV) to the more soluble Pu(V) or Pu(VI) valence states. A data driven approach was subsequently used to develop a modified response surface model for Pu solubility. Solubility data from this study and historical data from the literature were used to fit the model. The model predicted the Pu solubility of the solutions from this study within the 95% confidence interval for individual predictions and the analysis of variance indicated no statistically significant lack of fit. The Savannah River National Laboratory (SRNL) model was compared with predicted values from the Aqueous Electrolyte (AQ) model developed by OLI Systems, Inc. and a solubility prediction equation developed by Delegard and Gallagher for Hanford tank waste. The agreement between measured or values predicted by the SRNL model and values predicted by the OLI AG model was very poor. The much higher predicted concentrations by the OLI AQ model appears to be the result of the model predicting the predominate Pu oxidation state is Pu(V) which is reported as unstable below sodium hydroxide (NaOH) concentrations of 6 M. There was very good agreement between the predicted Pu concentrations using the SRNL model and the model developed by Delegard and Gallagher with the exception of solutions that had very high OH{sup -} (15 M) concentrations. The lower Pu solubilities in these solutions were attributed to the presence of NO{sub 3}{sup -} and NO{sub 2}{sup -} which limit the oxidation of Pu(IV) to Pu(V).

Rudisill, T.; Hobbs, D.; Edwards, T.

2010-09-27T23:59:59.000Z

398

Radiolytic gas production from concrete containing Savannah River Plant waste  

DOE Green Energy (OSTI)

To determine the extent of gas production from radiolysis of concrete containing radioactive Savannah River Plant waste, samples of concrete and simulated waste were irradiated by /sup 60/Co gamma rays and /sup 244/Cm alpha particles. Gamma radiolysis simulated radiolysis by beta particles from fission products in the waste. Alpha radiolysis indicated the effect of alpha particles from transuranic isotopes in the waste. With gamma radiolysis, hydrogen was the only significant product; hydrogen reached a steady-state pressure that increased with increasing radiation intensity. Hydrogen was produced faster, and a higher steady-state pressure resulted when an organic set retarder was present. Oxygen that was sealed with the wastes was depleted. Gamma radiolysis also produced nitrous oxide gas when nitrate or nitrite was present in the concrete. With alpha radiolysis, hydrogen and oxygen were produced. Hydrogen did not reach a steady-state pressure at <140 psi. From these results, estimates of pressure in conceptual containers (cylinders 2 feet ID by 10 feet tall, 90% full) of SRP waste concrete were made. During the first 300 years of storage when radiolysis will mainly be from beta-gamma radiation (from /sup 137/Cs and /sup 90/Sr), hydrogen will reach a steady-state pressure of 8 to 28 psi, and oxygen will be partially consumed. These predictions were confirmed by measurement of gas produced over a short time in a container of concrete and actual SRP waste. The tests with simulated waste also indicated that nitrous oxide may form, but because of the low nitrate or nitrite content of the waste, the maximum pressure of nitrous oxide after 300 years will be <60 psi. After decay of these fission products, alpha radiolysis from /sup 238/Pu and /sup 239/Pu will predominate; the hydrogen and oxygen pressures will increase to >200 psi.

Bibler, N.E.

1978-01-01T23:59:59.000Z

399

CRITICAL RADIONUCLIDE AND PATHWAY ANALYSIS FOR THE SAVANNAH RIVER SITE  

SciTech Connect

This report is an update to the analysis, Assessment of SRS Radiological Liquid and Airborne Contaminants and Pathways, that was performed in 1997. An electronic version of this large original report is included in the attached CD to this report. During the operational history (1954 to the present) of the Savannah River Site (SRS), many different radionuclides have been released to the environment from the various production facilities. However, as will be shown by this updated radiological critical contaminant/critical pathway analysis, only a small number of the released radionuclides have been significant contributors to potential doses and risks to offsite people. The analysis covers radiological releases to the atmosphere and to surface waters, the principal media that carry contaminants offsite. These releases potentially result in exposure to offsite people. The groundwater monitoring performed at the site shows that an estimated 5 to 10% of SRS has been contaminated by radionuclides, no evidence exists from the extensive monitoring performed that groundwater contaminated with these constituents has migrated off the site (SRS 2011). Therefore, with the notable exception of radiological source terms originating from shallow surface water migration into site streams, onsite groundwater was not considered as a potential exposure pathway to offsite people. In addition, in response to the Department of Energy's (DOE) Order 435.1, several Performance Assessments (WSRC 2008; LWO 2009; SRR 2010; SRR 2011) and a Comprehensive SRS Composite Analysis (SRNO 2010) have recently been completed at SRS. The critical radionuclides and pathways identified in these extensive reports are discussed and, where applicable, included in this analysis.

Jannik, T.

2011-08-30T23:59:59.000Z

400

USED NUCLEAR MATERIALS AT SAVANNAH RIVER SITE: ASSET OR WASTE?  

SciTech Connect

The nuclear industry, both in the commercial and the government sectors, has generated large quantities of material that span the spectrum of usefulness, from highly valuable (“assets”) to worthless (“wastes”). In many cases, the decision parameters are clear. Transuranic waste and high level waste, for example, have no value, and is either in a final disposition path today, or – in the case of high level waste – awaiting a policy decision about final disposition. Other materials, though discardable, have intrinsic scientific or market value that may be hidden by the complexity, hazard, or cost of recovery. An informed decision process should acknowledge the asset value, or lack of value, of the complete inventory of materials, and the structure necessary to implement the range of possible options. It is important that informed decisions are made about the asset value for the variety of nuclear materials available. For example, there is a significant quantity of spent fuel available for recycle (an estimated $4 billion value in the Savannah River Site’s (SRS) L area alone); in fact, SRS has already blended down more than 300 metric tons of uranium for commercial reactor use. Over 34 metric tons of surplus plutonium is also on a path to be used as commercial fuel. There are other radiological materials that are routinely handled at the site in large quantities that should be viewed as strategically important and / or commercially viable. In some cases, these materials are irreplaceable domestically, and failure to consider their recovery could jeopardize our technological leadership or national defense. The inventories of nuclear materials at SRS that have been characterized as “waste” include isotopes of plutonium, uranium, americium, and helium. Although planning has been performed to establish the technical and regulatory bases for their discard and disposal, recovery of these materials is both economically attractive and in the national interest.

Magoulas, V.

2013-06-03T23:59:59.000Z

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Restart of K-Reactor, Savannah River Site: Safety evaluation report  

Science Conference Proceedings (OSTI)

This Safety Evaluation Report (SER) focuses on those issues required to support the restart of the K-Reactor at the Savannah River Plant. This SER provides the safety criteria for restart and documents the results of the staff reviews of the DOE and operating contractor activities to meet these criteria. To develop the restart criteria for the issues discussed in this SER, the Savannah River Restart Office and Savannah River Special Projects Office staffs relied, when possible, on commercial industry codes and standards and on NRC requirements and guidelines for the commercial nuclear industry. However, because of the age and uniqueness of the Savannah River reactors, criteria for the commercial plants were not always applicable. In these cases, alternate criteria were developed. The restart criteria applicable to each of the issues are identified in the safety evaluations for each issue. The restart criteria identified in this report are intended to apply only to restart of the Savannah River reactors. Following the development of the acceptance criteria, the DOE staff and their support contractors evaluated the results of the DOE and operating contractor (WSRC) activities to meet these criteria. The results of those evaluations are documented in this report. Deviations or failures to meet the requirements are either justified in the report or carried as open or confirmatory items to be completed and evaluated in supplements to this report before restart. 62 refs., 1 fig.

Not Available

1991-04-01T23:59:59.000Z

402

Inspector General audit report on waste inventory data at Oak Ridge and Savannah River  

SciTech Connect

The Oak Ridge and Savannah River Operations Offices are responsible for maintaining reliable and accurate waste inventories to ensure effective waste management operations at their sites. The objective of this audit was to determine whether the hazardous, low-level, and low-level mixed waste inventories at the Oak Ridge Reservation and the Savannah River Site were accurate and reliable in Fiscal year (FY) 1998. The volumes of hazardous, low-level, and low-level mixed waste stored at the Oak Ridge Reservation was overstated in FY 1998 inventory records, and the locations of many waste containers at the Savannah River Site were recorded inaccurately or incompletely. Additionally, the Department incurred unnecessary costs adjusting waste inventory data for management reports at the Oak Ridge Reservation and locating waste containers for treatment or disposal at the Savannah River Site. The auditors recommended that the Acting Assistant Secretary for Environmental Management establish general requirements for tracking and reporting waste inventories at the sites. They also recommended that the Manager, Oak Ridge Operations Office, direct contractor personnel to perform an inventory of stored waste and establish adequate procedures to ensure that waste inventory records are kept current, accurate, and complete at all Oak Ridge Reservation sites. Further, they recommended that the Manager, Savannah River Operations Office, ensure that the planned inventory of stored waste is completed, and the contractor personnel record the storage location for all containers and update inventory data when containers are moved.

1998-12-01T23:59:59.000Z

403

MORTALITY AMONG WORKERS AT THE SAVANNAH RIVER NUCLEAR FUELS PRODUCTION FACILITY  

NLE Websites -- All DOE Office Websites (Extended Search)

MORTALITY AMONG WORKERS AT THE SAVANNAH RIVER NUCLEAR FUELS MORTALITY AMONG WORKERS AT THE SAVANNAH RIVER NUCLEAR FUELS PRODUCTION FACILITY Donna L. Cragle and Janice P. Watkins, Center for Epidemiologic Research; Kathryn Robertson-DeMers, Bechtel Hanford, Inc. Donna Cragle, Oak Ridge Associated Universities, P.O. Box 117, Oak Ridge, TN 37831-0117 Key Words: mortality study, radiation exposure, leukemia, occupational cohort, trend test INTRODUCTION Since 1952 the Savannah River Site (SRS), located in Aiken, South Carolina, has operated as a Department of Energy (DOE) production facility for nuclear fuels and other materials. A previous study 1 through 1980 of 9,860 white males employed at least 90 consecutive days at the SRS between 1952 and 1974 found an increased number of leukemia deaths among

404

Savannah River's Biomass Steam Plant Success with Clean and Renewable Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRS SRS Biomass Cogeneration Plant Tech Stage: Deployed (Operational) Energy Savings Performance Contract Project ID: Task Order No.-KL46299M The technical solution has been deployed to the A-Area at Savannah River Site. Page 1 of 2 Savannah River Site South Carolina Savannah River's Biomass Steam Plant Success with Clean and Renewable Energy Challenge In order to meet the federal energy and environmental management requirements in Presidential Executive Order 13423, DOE Order 430.2B, and the Transformational Energy Action Management (TEAM) Initiative, DOE Secretary Samuel Bodman encouraged the DOE federal complex to utilize third party financing options like the Energy Savings Performance Contract (ESPC). Specifically, this innovative renewable steam plant meets two of the TEAM initiatives, which strengthens the federal requirements by requiring that DOE sites (1)

405

Department of Energy Issues Final Request for Proposals for Savannah River  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Issues Final Request for Proposals for Issues Final Request for Proposals for Savannah River Site Liquid Waste Contract Department of Energy Issues Final Request for Proposals for Savannah River Site Liquid Waste Contract September 13, 2007 - 2:33pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the release of a final Request for Proposals (RFP) for the competitive selection of a Liquid Waste (LW) contractor for the Savannah River Site (SRS). The resulting contract is expected to be approximately $3 billion over six years with an option for a two year extension. The fee for the LW contract is up to ten percent. The primary facilities related to this procurement include liquid radioactive waste tank farms, the Defense Waste Processing Facility, the saltstone facility, and potential operation of the Salt Waste Processing

406

Savannah River Site Makes Progress on Recovery Act-funded Cleanup |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Makes Progress on Recovery Act-funded Cleanup Savannah River Site Makes Progress on Recovery Act-funded Cleanup Savannah River Site Makes Progress on Recovery Act-funded Cleanup February 9, 2011 - 12:00pm Addthis SRS loaded 14 standard waste boxes containing mixed and low-level waste that previously was classified as transuranic TRU waste. This shipment to a Florida treatment site marks the 1,000 cubic meter milestone of the 5,000 cubic meters in the Site’s TRU program that will be dispositioned through the Recovery Act. SRS loaded 14 standard waste boxes containing mixed and low-level waste that previously was classified as transuranic TRU waste. This shipment to a Florida treatment site marks the 1,000 cubic meter milestone of the 5,000 cubic meters in the Site's TRU program that will be dispositioned through

407

Department of Energy Cites Savannah River Nuclear Solutions, LLC for Worker  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Solutions, LLC Solutions, LLC for Worker Safety and Health Violations Department of Energy Cites Savannah River Nuclear Solutions, LLC for Worker Safety and Health Violations November 9, 2012 - 5:50pm Addthis News Media Contact (202) 586-4940 WASHINGTON - The U.S. Department of Energy has issued a Preliminary Notice of Violation (PNOV) to Savannah River Nuclear Solutions, LLC (SRNS) for violations of the Department's worker safety and health regulations. The violations are associated with a July 1, 2011, incident that occurred while a worker was using a Tele-Tower® scaffold to perform facility modifications in the Purification Area Vault of Building 105-K in the K-Area Complex at the Savannah River Site (SRS). The SRNS worker fell from the scaffold and was hospitalized with injuries to his head and

408

Savannah River Regional High School Science Bowl | U.S. DOE Office of  

Office of Science (SC) Website

Carolina Regions » Savannah River Carolina Regions » Savannah River Regional High School Science Bowl National Science Bowl® (NSB) NSB Home About High School High School Students High School Coaches High School Regionals High School Rules, Forms, and Resources Middle School Attending National Event Volunteers 2013 Competition Results News Media WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: 202-586-6702 E: National.Science.Bowl@science.doe.gov South Carolina Regions Savannah River Regional High School Science Bowl Print Text Size: A A A RSS Feeds FeedbackShare Page Regional Coordinator Information Name: Kim Mitchell Email: kimberly.mitchell@srs.gov Regional Event Information Date: Saturday, March 1, 2014

409

Final Environmental Impact Statement Waste Management Activities for Groundwater Protection Savannah River Plant Aiken, South Carolina  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Els-o120 Els-o120 Final Environmental Impact Statement I Waste Management Activities for Groundwater Protection Savannah River Plant Aiken, South Carolina of Energy 1 COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy ACTIVITY: Final Environmental Impact Statement, Waste Management I TC Activities for Groundwater Protection at the Savannah River Plant, Aiken, South Carolina. CONTACT: ABSTRACT: Additional information concerning this Statement can be obtained from: Mr. S. R. Wright Director, Environmental Division U.S. Department of Energy Savannah River Operations Office Post Office Box A Aiken, South Carolina 29802 (803) 725-3957 I TC For general information on the Department of Energy qs EIS process contact: Office of the Assistant Secretary for Environment, Safety, and Health U.S. Department of Energy Attn: Ms. Carol Bergstrom (EH-25) Acting Director, Office of

410

Savannah River Site Team Wins Carolina Challenge at 2012 DOE Security  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Team Wins Carolina Challenge at 2012 DOE Team Wins Carolina Challenge at 2012 DOE Security Protection Officer Competition Savannah River Site Team Wins Carolina Challenge at 2012 DOE Security Protection Officer Competition April 26, 2012 - 12:00pm Addthis Media Contact Bill Taylor, (803) 952-8564, bill.taylor@srs.gov Savannah River Site, Aiken, S.C. - Security Protection Officers from Savannah River Site's (SRS) security contractor WSI-SRS, today won the Department of Energy (DOE) Secretary's Trophy as the top DOE team in the 2012 Security Protection Officer Team Competition (SPOTC)- 2012 Carolina Challenge, held here, April 22-26. It was the 40th anniversary of the SPOTC competition. In 2012 Carolina Challenge, SRS was among 11 teams representing DOE sites. The threeman team competition was won by Security Protection Officers

411

Salt Waste Disposal at the Savannah River Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Salt Waste Disposal at the Savannah River Site Salt Waste Disposal at the Savannah River Site Salt Waste Disposal at the Savannah River Site Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 authorizes the Secretary of Energy, in consultation with the Nuclear Regulatory Commission, to reclassify certain waste from reprocessing spent nuclear fuel from high-level waste to low-level waste if it meets the criteria set forth in Section 3116. Currently, DOE SRS has prepared one final (salt waste) and is working on two additional waste determinations: F Tank Farm and H Tank Farm. The Salt Waste Determination has been finalized and the Secretary of Energy issued that determination on January 17, 2006. In 2007, it was decided that due to a new Saltstone disposal vault design,

412

F-Area Tank Farm, Savannah River Site Available for Public Comment  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 February 20, 2013 Industrial Wastewater Closure Module for Liquid Waste Tanks 5F and 6F F-Area Tank Farm, Savannah River Site Available for Public Comment Background: The U.S. Department of Energy (DOE) Savannah River Operations Office has requested approval from the South Carolina De- partment of Health and Environmental Control (SCDHEC) of the Industrial Wastewater Closure Module for Waste Tanks 5F and 6F to support removal from service of these subject tanks located in the F-Area Tank Farm (FTF) at the Savannah River Site (SRS). The FTF General Closure Plan, approved on January 24, 2011, established the protocols by which DOE would: (1) close SRS FTF waste tank systems in accordance with South Carolina Regulations R.61-82, "Proper Closeout of Wastewater

413

from Savannah River Nuclear Solutions, LLC NEWS Mobility Impaired Hunters Seek Trophy Buck at SRS  

NLE Websites -- All DOE Office Websites (Extended Search)

Mobility Impaired Hunters Seek Trophy Buck at SRS Mobility Impaired Hunters Seek Trophy Buck at SRS SRNS manages hunt, providing an opportunity of a lifetime AIKEN, S.C. (Sept. 17, 2012) - Twenty-five physically disabled hunters participated today in the twelfth annual "Deer Hunt for Mobility-Impaired Hunters" at the Savannah River Site, Aiken, S.C. Mobility-impaired hunters from throughout the southeast, and as far as Ohio, met Friday, Nov. 16, at the Savannah River Ecology Lab (SREL) Conference Center to begin the two day hunt. "The Site is a prime location to conduct this type of hunt and we are fortunate to be a part of such a special event," said Ed Spears, Savannah River Nuclear Solutions, LLC (SRNS) Deer Hunt Manager. "This hunt specifically is special because it is a unique opportunity for

414

Savannah River Site 2012 Outlook: Transuranic Waste Program Set to Safely  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site 2012 Outlook: Transuranic Waste Program Set to Site 2012 Outlook: Transuranic Waste Program Set to Safely Reach Milestone Savannah River Site 2012 Outlook: Transuranic Waste Program Set to Safely Reach Milestone January 1, 2012 - 12:00pm Addthis By May, Savannah River Nuclear Solutions expects to be shipping transuranic waste to the Waste Isolation Pilot Plant almost continuously, using six TRUPACT-III shipping containers like the one shown here. By May, Savannah River Nuclear Solutions expects to be shipping transuranic waste to the Waste Isolation Pilot Plant almost continuously, using six TRUPACT-III shipping containers like the one shown here. Workers relocate a pipe overpack container used to transport small amounts of excess plutonium oxide destined for long-term storage at the Waste Isolation Pilot Plant in Carlsbad, New Mexico.

415

Department of Energy Issues Final Request for Proposals for Savannah River  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Request for Proposals for Final Request for Proposals for Savannah River Site Liquid Waste Contract Department of Energy Issues Final Request for Proposals for Savannah River Site Liquid Waste Contract September 13, 2007 - 2:33pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the release of a final Request for Proposals (RFP) for the competitive selection of a Liquid Waste (LW) contractor for the Savannah River Site (SRS). The resulting contract is expected to be approximately $3 billion over six years with an option for a two year extension. The fee for the LW contract is up to ten percent. The primary facilities related to this procurement include liquid radioactive waste tank farms, the Defense Waste Processing Facility, the saltstone facility, and potential operation of the Salt Waste Processing

416

Savannah River Region: Transition between the Gulf and Atlantic Coastal Plains. Proceedings  

Science Conference Proceedings (OSTI)

The focus of the this conference of Coastal Plains geologists was on the Savannah River region of Georgia and South Carolina, and particularly on the geology of the US Department of Energy`s 300 square mile Savannah River Site (SRS) in western South Carolina. Current geological studies indicate that the Mesozoic-Cenozoic section in the Savannah River region is transitional between that of the Gulf Coastal Plain to the southwest and that of the Atlantic Coastal Plain to the northeast. With the transitional aspect of the region as its theme, the first session was devoted to overviews of Cretaceous and Paleogene geology in the Gulf and Atlantic Coastal Plains. Succeeding presentations and resulting discussions dealt with more specific problems in structural, lithostratigraphic, hydrological, biostratigraphic, and cyclostratigraphic analysis, and of correlation to standard stratigraphic frameworks. For these conference proceedings, individual papers have been processed separately for the Energy Data Base.

Zullo, V.A.; Harris, W.B.; Price, V. [eds.

1990-12-31T23:59:59.000Z

417

DOE Order 435.1 Performance Assessment Savannah River Site | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Order 435.1 Performance Assessment Savannah River Site Order 435.1 Performance Assessment Savannah River Site DOE Order 435.1 Performance Assessment Savannah River Site Performance Assessments (PA) are analyses conducted for low level radioactive waste disposal facilities (or appropriate CERCLA documentation for a low level radioactive waste disposal facility), and are critical in determining the nature and extent of the controls that need to be put in place at the facility being evaluated. There are specific requirements for the protection of the public, workers, and environment that are critical to maintaining safe and effective disposal of radioactive waste and the PA is a risk analysis of the potential hazards of disposing of low level radioactive waste. The review and approval of these evaluations is

418

SAVANNAH RIVER SITE R REACTOR DISASSEMBLY BASIN IN SITU DECOMMISSIONING  

SciTech Connect

The US DOE concept for facility in-situ decommissioning (ISD) is to physically stabilize and isolate in tact, structurally sound facilities that are no longer needed for their original purpose of, i.e., generating (reactor facilities), processing(isotope separation facilities) or storing radioactive materials. The 105-R Disassembly Basin is the first SRS reactor facility to undergo the in-situ decommissioning (ISD) process. This ISD process complies with the105-R Disassembly Basin project strategy as outlined in the Engineering Evaluation/Cost Analysis for the Grouting of the R-Reactor Disassembly Basin at the Savannah River Site and includes: (1) Managing residual water by solidification in-place or evaporation at another facility; (2) Filling the below grade portion of the basin with cementitious materials to physically stabilize the basin and prevent collapse of the final cap - Sludge and debris in the bottom few feet of the basin will be encapsulated between the basin floor and overlying fill material to isolate if from the environment; (3) Demolishing the above grade portion of the structure and relocating the resulting debris to another location or disposing of the debris in-place; and (4) Capping the basin area with a concrete slab which is part of an engineered cap to prevent inadvertent intrusion. The estimated total grout volume to fill the 105-R Reactor Disassembly Basin is 24,424 cubic meters or 31,945 cubic yards. Portland cement-based structural fill materials were design and tested for the reactor ISD project and a placement strategy for stabilizing the basin was developed. Based on structural engineering analyses and work flow considerations, the recommended maximum lift height is 5 feet with 24 hours between lifts. Pertinent data and information related to the SRS 105-R-Reactor Disassembly Basin in-situ decommissioning include: regulatory documentation, residual water management, area preparation activities, technology needs, fill material designs and testing, and fill placement strategy. This information is applicable to decommissioning both the 105-P and 105-R facilities. The ISD process for the entire 105-P and 105-R reactor facilities will require approximately 250,000 cubic yards (191,140 cubic meters) of grout and 2,400 cubic yards (1,840 cubic meters) of structural concrete which will be placed over a twelve month period to meet the accelerated schedule ISD schedule. The status and lessons learned in the SRS Reactor Facility ISD process will be described.

Langton, C.; Blankenship, J.; Griffin, W.; Serrato, M.

2009-12-03T23:59:59.000Z

419

Hanford and Savannah River Site Programmatic and Technical Integration  

SciTech Connect

The Hanford Site and the Savannah River Site (SRS) were the primary plutonium production facilities within the U.S. nuclear weapons complex. Radioactive wastes were generated as patt of these missions and are stored in similar fashion. The majority of radioactivity maintained by the two sites is located in underground carbon steel tanks in the physical form of supernatant, saltcake, or sludge. Disposition of SRS tank waste is ongoing by converting it into glass (pathway for sludge and radionuclides separated from supernatant or dissolved saltcake) or cement (pathway for the decontaminated supernatant and dissolved saltcake). Tank closure activity has also begun at SRS and will continue for the duration of mission. The Hanford tank waste inventory is roughly 2/3rds larger than SRS's by volume- but nominally half the radioactivity. The baseline disposition path includes high-level and low-activity waste vitrification. with separate disposition of contact-handled transuranic tank waste. Retrieval of tank waste from aging single­ shell tanks (SSTs) into double-shell tanks (DSTs) is currently ongoing. As vitrification commences later this decade, Hanford will be in a similar operations mode as SRS. Site integration is increasing as the missions align. The ongoing integration is centered on key issues that impact both sites- regardless of mission timeframe. Three recent workshop exchanges have been held to improve communication with the primary intent of improving operations and technical work organization. The topics of these workshops are as follows: · 1) DST space utilization, optimization, and closure 2) Waste Feed Qualification 3) Cementitious Waste Forms Key goals for these and future exchanges include aligning research and technology, preparing for joint initiatives (to maximize budgetary value for the customer), and reviewing lessons learned. Each site has played a leading role in the development of technology and operational practices that can be used to meet current challenges and to minimize the impact of future challenges. This paper provides an overview of the exchanges held, but predominately focuses on the team development and actions leading from the workshops.

Ramsey, William Gene

2013-08-15T23:59:59.000Z

420

Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping and Pipe Supports, September 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Savannah River Site, Salt Waste Processing Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports September 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background .......................................................................................................................................... 1

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping and Pipe Supports, September 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site, Salt Waste Processing Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports September 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background .......................................................................................................................................... 1

422

Final Review of Safety Assessment Issues at Savannah River Site, August 2011  

Science Conference Proceedings (OSTI)

At the request of Savannah River Nuclear Solutions (SRNS) management, a review team composed of experts in atmospheric transport modeling for environmental radiation dose assessment convened at the Savannah River Site (SRS) on August 29-30, 2011. Though the meeting was prompted initially by suspected issues related to the treatment of surface roughness inherent in the SRS meteorological dataset and its treatment in the MELCOR Accident Consequence Code System Version 2 (MACCS2), various topical areas were discussed that are relevant to performing safety assessments at SRS; this final report addresses these topical areas.

Napier, Bruce A.; Rishel, Jeremy P.; Bixler, Nathan E.

2011-12-15T23:59:59.000Z

423

SAVANNAH RIVER SITE CAPABILITIES FOR CONDUCTING INGESTION PATHWAY CONSEQUENCE ASSESSMENTS FOR EMERGENCY RESPONSE  

SciTech Connect

Potential airborne releases of radioactivity from facilities operated for the U. S. Department of Energy at the Savannah River Site could pose significant consequences to the public through the ingestion pathway. The Savannah River National Laboratory has developed a suite of technologies needed to conduct assessments of ingestion dose during emergency response, enabling emergency manager at SRS to develop initial protective action recommendation for state agencies early in the response and to make informed decisions on activation of additional Federal assets that would be needed to support long-term monitoring and assessment activities.

Hunter, C

2007-12-11T23:59:59.000Z

424

ROBOTICS IN HAZARDOUS ENVIRONMENTS - REAL DEPLOYMENTS BY THE SAVANNAH RIVER NATIONAL LABORATORY  

Science Conference Proceedings (OSTI)

The Research & Development Engineering (R&DE) section in the Savannah River National Laboratory (SRNL) engineers, integrates, tests, and supports deployment of custom robotics, systems, and tools for use in radioactive, hazardous, or inaccessible environments. Mechanical and electrical engineers, computer control professionals, specialists, machinists, welders, electricians, and mechanics adapt and integrate commercially available technology with in-house designs, to meet the needs of Savannah River Site (SRS), Department of Energy (DOE), and other governmental agency customers. This paper discusses five R&DE robotic and remote system projects.

Kriikku, E.; Tibrea, S.; Nance, T.

2010-09-27T23:59:59.000Z

425

Evaluation of System Level Modeling and Simulation Tools in Support of Savannah River Site Liquid Waste Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Liquid Waste Process Savannah River Site Liquid Waste Process June 2009 Monica C. Regalbuto Office of Waste Processing DOE/EM Kevin G. Brown Vanderbilt University and CRESP David W. DePaoli Oak Ridge National Laboratory Candido Pereira Argonne National Laboratory John R. Shultz Office of Waste Processing DOE/EM Sahid C. Smith Office of Waste Processing DOE/EM External Technical Review for Evaluation of System Level Modeling and Simulation Tools in Support of Savannah River Site Liquid Waste Process June 2009 ACKNOWLEDGEMENTS The Review Team thanks Ms. Sonitza Blanco, Team Lead Planning and Coordination Waste Disposition Project U.S. Department of Energy Savannah River Operations Office and Mr. Pete Hill, Liquid Waste Planning Manager for Washington Savannah River Company, for their

426

INSTALLATION OF BUBBLERS IN THE SAVANNAH RIVER SITED DEFENSE WASTE PROCESSING FACILITY MELTER  

Science Conference Proceedings (OSTI)

Savannah River Remediation (SRR) LLC assumed the liquid waste contract at the Savannah River Site (SRS) in the summer of 2009. The main contractual agreement was to close 22 High Level Waste (HLW) tanks in eight years. To achieve this aggressive commitment, faster waste processing throughout the SRS liquid waste facilities will be required. Part of the approach to achieve faster waste processing is to increase the canister production rate of the Defense Waste Processing Facility (DWPF) from approximately 200 canisters filled with radioactive waste glass per year to 400 canisters per year. To reach this rate for melter throughput, four bubblers were installed in the DWPF Melter in the late summer of 2010. This effort required collaboration between SRR, SRR critical subcontractor EnergySolutions, and Savannah River Nuclear Solutions, including the Savannah River National Laboratory (SRNL). The tasks included design and fabrication of the bubblers and related equipment, testing of the bubblers for various technical issues, the actual installation of the bubblers and related equipment, and the initial successful operation of the bubblers in the DWPF Melter.

Smith, M.; Iverson, D.

2010-12-08T23:59:59.000Z

427

Design of a pilot silvicultural biomass farm at the Savannah River Plant  

DOE Green Energy (OSTI)

Metrek has designed a detailed plan for the establishment and operation of a 1000-acre silvicultural biomass farm at the Savannah River Plant, Aiken, South Carolina. The plan includes a discussion of possible sites, layout and design, and installation and operation. The estimated costs of installation and operation are also presented.

Salo, D.J.; Henry, J.F.; Inman, R.E.

1979-03-01T23:59:59.000Z

428

Cost benefit of caustic recycle for tank waste remediation at the Hanford and Savannah River Sites  

SciTech Connect

The potential cost savings due to the use of caustic recycle used in conjunction with remediation of radioactive underground storage tank waste, is shown in a figure for the Hanford and Savannah River sites. Two cost savings estimates for each case have been made for Hanford, and one cost savings estimate for each case have been made for Hanford, and one cost savings estimate for each case has been made for the Savannah River site. This is due to the Hanford site remediation effort being less mature than that of Savannah River; and consequently, a range of cost savings being more appropriate for Hanford. This range of cost savings (rather than a ingle value) for each case at Hanford is due to cost uncertainties related to the LAW immobilization operation. Caustic recycle Case-1 has been defined as the sodium required to meet al identified caustic needs for the entire Site. Case-2 has been defined as the maximum sodium which can be separated from the low activity waste without precipitation of Al(OH){sub 3}. It has been determined that the potential cost savings at Hanford ranges from $194 M to $215 M for Case-1, and $293 M to $324 M for Case-2. The potential cost savings at Savannah River are $186 M for Case-1 and $281 M for Case-2. A discussion of the uncertainty associated with these cost savings estimates can be found in the Discussion and Conclusions section.

DeMuth, S. [Los Alamos National Lab., NM (United States). Technology and Safety Assessment Div.; Kurath, D. [Pacific Northwest National Lab., Richland, WA (United States)

1998-07-30T23:59:59.000Z

429

Savannah River Ecology Laboratory annual technical progress report of ecological research, period ending July 31, 1993  

SciTech Connect

This progress report gives an overview of research programs at the Savannah River Site. Topics include; environmental operations support, wood stork foraging and breeding, defense waste processing, environmental stresses, alterations in the environment due to pollutants, wetland ecology, biodiversity, pond drawdown studies, and environmental toxicology.

Vaitkus, M.R.; Wein, G.R. [eds.; Johnson, G.

1993-11-01T23:59:59.000Z

430

Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan, Rev. 1  

Science Conference Proceedings (OSTI)

This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report.

Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

2001-12-10T23:59:59.000Z

431

Savannah River Site Salt Processing Project: FY2002 Research and Development Program Plan  

Science Conference Proceedings (OSTI)

This Plan describes the technology development program for alpha/strontium removal and Caustic Side Solvent Extraction cesium removal in FY2002. Crystalline Silicotitanate and Small Tank Tetratphenylborate Precipitation are discussed as possible backup technologies. Previous results are summarized in the Savannah River Site Salt Processing Project Research and Development Summary Report

Harmon, Harry D.; Leugemors, Robert K.; Schlahta, Stephan N.; Fink, Samuel D.; Thompson, Major C.; Walker, Darrell D.

2001-10-31T23:59:59.000Z

432

Review of the Savannah River Site Salt Waste Processing Facility...  

NLE Websites -- All DOE Office Websites (Extended Search)

River Site Salt Waste Processing Facility Safety Basis and Design Development May 2011 August 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement...

433

Pilot study risk assessment for selected problems at the Savannah River Site (SRS)  

SciTech Connect

An assessment of the health risks was made for releases of tritium and {sup 137}Cs from the Savannah River Site (SRS) at water-receptor locations downriver. Although reactor operations were shut down at the SRS in 1989, liquid wastes continue to be released to the Savannah River either by direct discharges into onsite surface waters or by groundwater transport into surface waters from waste facilities. Existing state mandates will cause the liquid waste streams from future operations to go directly into surface waters. Two drinking water processing plants take water from the river approximately 129 km downriver from the SRS. Potential incremental risks of cancer fatality to individuals and each population were analyzed for either no further reactor operations or resumption of operation of one specific reactor.

Hamilton, L.D.; Holtzman, S.; Meinhold, A.; Morris, S.C.; Pardi, R.; Sun, C. [Brookhaven National Lab., Upton, NY (United States); Daniels, J.I.; Layton, D.; McKone, T.E.; Straume, T.; Anspaugh, L. [Lawrence Livermore National Lab., CA (United States)

1993-03-01T23:59:59.000Z

434

Pilot study risk assessment for selected problems at the Savannah River Site (SRS)  

SciTech Connect

An assessment of the health risks was made for releases of tritium and [sup 137]Cs from the Savannah River Site (SRS) at water-receptor locations downriver. Although reactor operations were shut down at the SRS in 1989, liquid wastes continue to be released to the Savannah River either by direct discharges into onsite surface waters or by groundwater transport into surface waters from waste facilities. Existing state mandates will cause the liquid waste streams from future operations to go directly into surface waters. Two drinking water processing plants take water from the river approximately 129 km downriver from the SRS. Potential incremental risks of cancer fatality to individuals and each population were analyzed for either no further reactor operations or resumption of operation of one specific reactor.

Hamilton, L.D.; Holtzman, S.; Meinhold, A.; Morris, S.C.; Pardi, R.; Sun, C. (Brookhaven National Lab., Upton, NY (United States)); Daniels, J.I.; Layton, D.; McKone, T.E.; Straume, T.; Anspaugh, L. (Lawrence Livermore National Lab., CA (United States))

1993-03-01T23:59:59.000Z

435

The Savannah River Site (SRS) is located in south-central South Carolina approximately 100 miles from the Atlantic Coast  

NLE Websites -- All DOE Office Websites (Extended Search)

124 124 Revision 0 Tank 18/Tank 19 Special Analysis for the Performance Assessment for the F-Tank Farm at the Savannah River Site February 2012 Prepared by: Savannah River Remediation LLC Closure and Waste Disposal Authority Aiken, SC 29808 Prepared for U.S. Department of Energy Under Contract No. DE-AC09-09SR22505 Tank 18/Tank 19 Special Analysis for the SRR-CWDA-2010-00124 Performance Assessment for the Revision 0 F-Tank Farm at the Savannah River Site February 2012 Page 2 of 132 TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................. 2 LIST OF FIGURES ...................................................................................................................... 4

436

First Draft Performance Assessment for the H-Area Tank Farm at the Savannah River Site - Part 1  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRR-CWDA-2010-00128 SRR-CWDA-2010-00128 Revision 0 PERFORMANCE ASSESSMENT for the H-AREA TANK FARM at the SAVANNAH RIVER SITE March 2011 Prepared by: Savannah River Remediation LLC Closure & Waste Disposal Authority Aiken, SC 29808 Prepared for U.S. Department of Energy Under Contract No. DE-AC09-09SR22505 Performance Assessment for the SRR-CWDA-2010-00128 H-Area Tank Farm at the Revision 0 Savannah River Site March 2011 Page ii of 864 REVISION SUMMARY REV. # DESCRIPTION DATE OF ISSUE 0a Initial issue to DOE-SR 09/17/2010

437

U.S. Department of Energy Office of Inspector General report on inspection of Westinghouse Savannah River Company fees for managing and operating the Savannah River Site  

Science Conference Proceedings (OSTI)

During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department`s annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth in fees over this five year period. The review disclosed that, after Fiscal Year 1989, the Department used an increasing number of fee bases in calculating Westinghouse Savannah River Company`s fixed-fee-equivalents from the maximum fee schedules within the Department of Energy Acquisition Regulation. The authors found that the Department had significantly increased the percentage of the dollar value of subcontracts being placed in Westinghouse`s fee bases for fee calculation purposes. They found that the Department had effectively increased Westinghouse`s fixed-fee-equivalents by approximately $3 million in both Fiscal Year 1993 and 1994 to, in large part, fund an unallowable employee incentive compensation program. They found that Westinghouse`s total paid fees for the five year period increased significantly over what they would have been had the terms resulting from the original competitive negotiations been maintained. The authors recommended that the Deputy Assist Secretary for Procurement and Assistance Management require that changes in either the number or composition of fee bases used in calculating fees from the maximum fee schedules be submitted to the Department`s Procurement Executive for approval.

NONE

1995-08-03T23:59:59.000Z

438

Savannah River Site Retires Coal-Fired D-Area Powerhouse after Nearly 60 Years of Service  

Energy.gov (U.S. Department of Energy (DOE))

AIKEN, S.C. – The Savannah River Site (SRS) has shut down the massive, coal-powered D-Area powerhouse as the site turns to new, clean and highly efficient power generation technology.

439

Review of the Implementation Verification Rev iew Processes at the Savannah River Site Environmental Management Nuclear Facilities, September 2011  

NLE Websites -- All DOE Office Websites (Extended Search)

Implementation Verification Review Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities May 2011 September 2011 Office of Safety and Emergency Management Evaluations Office of Health, Safety and Security U.S. Department of Energy i Independent Oversight Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1

440

DOE/EIS-0279; Savannah River Site Spent Nuclear Fuel Management Final Environmental Impact Statement (March 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 2000 Cover Sheet iii COVER SHEET RESPONSIBLE AGENCY: U.S. Department of Energy (DOE) TITLE: Savannah River Site, Spent Nuclear Fuel Management Final Environmental Impact Statement (DOE/EIS-0279) CONTACT: For additional information on this environmental impact statement, write or call: Andrew R. Grainger, NEPA Compliance Officer U.S. Department of Energy, Savannah River Operations Office, Building 742A, Room 183

Note: This page contains sample records for the topic "officess savannah river" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development, August 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development May 2011 August 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose.................................................................................................................................................... 1 2.0 Background ............................................................................................................................................. 1 3.0 Scope and Methodology ......................................................................................................................... 2 4.0 Results .................................................................................................................................................... 3

442

Review of the Implementation Verification Rev iew Processes at the Savannah River Site Environmental Management Nuclear Facilities, September 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Implementation Verification Review Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities May 2011 September 2011 Office of Safety and Emergency Management Evaluations Office of Health, Safety and Security U.S. Department of Energy i Independent Oversight Review of the Implementation Verification Review Processes at the Savannah River Site Environmental Management Nuclear Facilities Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background ........................................................................................................................................... 1

443

Savannah River Site Consent Order 95-22-HW, September 29, 1995 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Consent Order, September 29, 1995 Savannah River Site Consent Order, September 29, 1995 (No. 95-22-HW) State South Carolina Agreement Type Consent Order Legal Driver(s) FFCAct Scope Summary Approve and establish guidelines for the Proposed Site Treatment Plan Parties DOE (SRS); State of South Carolina (Department of Health and Environmental Control) Date 9/29/1995 SCOPE * Approve the Proposed Site Treatment Plan, now to be known as the Approved Site Treatment Plan. * Establish guidelines for executing the Approved STP. ESTABLISHING MILESTONES * No later than April 30 of each year, SRS shall submit to the Department Annual Updates to the Approved STP. * SRS shall submit to the Department for information only a progress report on the Waste Isolation Pilot Plan (WIPP) with the Annual Update.

444

Finding of No Significant Impact, Consolidated Incineration Facility at the Savannah River Site, Aiken, SC  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

92 WL 381301 (F.R.) 92 WL 381301 (F.R.) NOTICES DEPARTMENT OF ENERGY Finding of No Significant Impact, Consolidated Incineration Facility at the Savannah River Site, Aiken, SC Thursday, December 24, 1992 *61402 AGENCY: Department of Energy. ACTION: Finding of no significant impact. SUMMARY: The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA -0400) for the proposed construction and operation of the Consolidated Incineration Facility (CIF) at the Savannah River Site (SRS), Aiken, South Carolina. The CIF would be for the treatment of hazardous, low- level radioactive, and mixed (both hazardous and radioactive) wastes from SRS. Incineration would reduce the volume and toxicity of these wastes. Construction and operation of the

445

from Savannah River Nuclear Solutions, LLC NEWS SRNS Partners with Georgialina Physical Therapy Associates to  

NLE Websites -- All DOE Office Websites (Extended Search)

Partners with Georgialina Physical Therapy Associates to Partners with Georgialina Physical Therapy Associates to Bring Services to SRS Employees AIKEN, S.C. - April 25, 2013 - The days of long drives, even longer wait times, and work challenges associated with ongoing physical therapy appointments are drawing to an end for Savannah River Site (SRS) employees thanks to a partnership between Savannah River Nuclear Solutions, LLC (SRNS) and Georgialina Physical Therapy (GPT) Associates. Together, the companies have launched a new program to provide a range of physical therapy services to all SRS employees. "Any SRS employee can schedule an appointment with us at our on-site location," said Brett Brannon, co-owner, Georgialina Physical Therapy Associates. "We provide the same services at our SRS clinic that we do in any of our

446

The Savannah River Site`s Groundwater Monitoring Program, second quarter 1989  

Science Conference Proceedings (OSTI)

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During second quarter 1989 (April--June), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. The flagging criteria are based on detection limits, background levels in SRS groundwater, and drinking water standards. An explanation of flagging criteria for the second quarter is presented in the Flagging Criteria section of this document. All analytical results from second quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-12-31T23:59:59.000Z

447

Summary of the Preliminary Analysis of Savannah River Depleted Uranium Trioxide  

SciTech Connect

This report summarizes a preliminary special analysis of the Savannah River Depleted Uranium Trioxide waste stream (SVRSURANIUM03, Revision 2). The analysis is considered preliminary because a final waste profile has not been submitted for review. The special analysis is performed to determine the acceptability of the waste stream for shallow land burial at the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada National Security Site (NNSS). The Savannah River Depleted Uranium Trioxide waste stream requires a special analysis because the waste stream’s sum of fractions exceeds one. The 99Tc activity concentration is 98 percent of the NNSS Waste Acceptance Criteria and the largest single contributor to the sum of fractions.

NSTec Environmental Management

2010-10-13T23:59:59.000Z

448

Annual review of cultural resource investigations by the Savannah River Archaeological Research Program. Fiscal year 1993  

Science Conference Proceedings (OSTI)

A cooperative agreement with the United States Department of Energy provides the necessary funding for the Savannah River Archaeological Research Program (SRARP) of the South Carolina Institute of Archaeology and Anthropology, University of South Carolina, to render services required under federal law for the protection and management of archaeological resources on the Savannah River Site (SRS). Because the significance of archaeological resources is usually determined by research potential, the SRARP is guided by research objectives. An ongoing research program provides the theoretical, methodological, and empirical basis for assessing site significance within the compliance process specified by law. In accordance with the spirit of the law, the SRARP maintains an active public education program for disseminating knowledge about prehistory and history, and for enhancing awareness of historic preservation. This report summarizes the management, research, and public education activities of the SRARP during Fiscal Year 1993.

Not Available

1993-10-01T23:59:59.000Z

449

Management Activities for Retrieved and Newly Generated Transuranic Wastes Savannah River Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8 WL 253648 (F.R.) 8 WL 253648 (F.R.) NOTICES DEPARTMENT OF ENERGY Finding of No Significant Impact; Transuranic Waste Management Activities at the Savannah River Plant, Aiken, SC Tuesday, August 30, 1988 *33172 AGENCY: Department of Energy. ACTION: Finding of No Significant Impact. SUMMARY: The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -0315, for transuranic (TRU) waste management activities at DOE's Savannah River Plant (SRP), including the construction and operation of a new TRU Waste Processing Facility. Based on analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact

450

Review of Safety Basis Development for the Savannah River Site Salt Waste Processing Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of5 of5 U.S. Department of Energy Subject: Review of Safety Basis Development for the Savannah River Site Salt Waste Processing Facility - Inspection Criteria, Approach, and Line:~ HS: Rev: Eff. Date: HSS CRAD 45-57 0 January 31,2013 Office of Safety and Emergency Management Evaluations Acting Direc or, Office of Sifety and Emergency Management Evaluations Date: January 31, 2013 Criteria Review and Approach Document LL.v. ~·M Criteria Lead:ife\riew of Safety Basis Development for the Savannah River Site Salt Waste Processing Facility Page 1 of 5 Date: January 31, 2013 1.0 PURPOSE Within the Office of Health, Safety and Security (HSS), the Office of Enforcement and Oversight, Office of Safety and Emergency Management Evaluations (HS-45) mission is to assess the effectiveness of the

451

Savannah River Site's H Canyon Begins 2012 with New and Continuing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site's H Canyon Begins 2012 with New and Site's H Canyon Begins 2012 with New and Continuing Missions - Transuranic waste remediation, new mission work are the focus of the nation's only active nuclear chemical separations facility in 2012 Savannah River Site's H Canyon Begins 2012 with New and Continuing Missions - Transuranic waste remediation, new mission work are the focus of the nation's only active nuclear chemical separations facility in 2012 January 1, 2012 - 12:00pm Addthis H Canyon, above, and HB-Line are scheduled to soon begin dissolving and purifying plutonium currently stored at the Savannah River Site to demonstrate the capability to produce oxide material that meets the Mixed Oxide Facility (MOX) feedstock specifications. The production process at MOX, which is now under construction, will eventually create fuel pellets for U.S. commercial reactor fuel assemblies.

452

Radioactive releases at the Savannah River Site, 1954--1989. An Environmental Protection Department summary  

Science Conference Proceedings (OSTI)

This report is the continuation of a series of reports, previously titled, Releases of Radioactivity at the Savannah River Plant (DPSPU-YR-25-1). The reports reflect the use of air and liquid effluent sample analyses in determining the amount of radioactivity released from Savannah River Site (SRS) operations. The identification and characterization of these source terms since plant startup in 1954 have aided Site personnel in confining and limiting the amount of radioactivity released to the environment from SRS facilities. This document is an effluent/source term report; items falling under other categories, such as environmental spills or solid waste transport to the burial ground, are not included. Any classified or secret data have either been excluded, as in the case of 1960--1970 atmospheric releases of {sup 85}Kr from the Separations Areas, or combined to avoid classification, such as atmospheric tritium releases from the Separations Area.

Cummins, C.L.; Hetrick, C.S.; Martin, D.K.

1991-02-01T23:59:59.000Z

453

The Savannah River Site`s Groundwater Monitoring Program. Fourth quarter, 1989  

Science Conference Proceedings (OSTI)

The Environmental Monitoring Section of the Environmental and Health Protection (EHP) Department administers the Savannah River Site`s Groundwater Monitoring Program. During fourth quarter 1989 (October--December), EHP conducted routine sampling of monitoring wells and drinking water locations. EHP collected the drinking water samples from Savannah River Site (SRS) drinking water systems supplied by wells. EHP established two sets of flagging criteria in 1986 to assist in the management of sample results. The flagging criteria aid personnel in sample scheduling, interpretation of data, and trend identification. An explanation of flagging criteria for the fourth quarter is presented in the Flagging Criteria section of this document. All analytical results from fourth quarter 1989 are listed in this report, which is distributed to all waste-site custodians.

Not Available

1989-12-31T23:59:59.000Z

454

An aerial radiological survey of the southwest drainage basin area of the Savannah River Site  

SciTech Connect

An aerial radiological survey was conducted over a 106-square-mile area of the Savannah River Site (SRS), formerly the Savannah River Plant. The survey was conducted from August 24 through September 8, 1988, to collect baseline radiological data over the area. Both natural and man-made gamma emitting radionuclides were detected in the area. The detected man-made sources were confined to creeks, branches, and SRS facilities in the surveyed area and were a result of SRS operations. Naturally-occurring radiation levels were consistent with those levels detected in adjacent areas during previous surveys. The annual dose levels were within the range of levels found throughout the United States.

Feimster, E.L.

1994-04-01T23:59:59.000Z

455

ADVANCES IN SE-79 ANALYSES ON SAVANNAH RIVER SITE RADIOACTIVE WASTE MATRICES  

SciTech Connect

Waste cleanup efforts underway at the United States Department of Energy's (DOE) Savannah River Site (SRS) in South Carolina, as well as other DOE nuclear sites, have created a need to characterize {sup 79}Se in radioactive waste inventories. Successful analysis of {sup 79}Se in high activity waste matrices is challenging for a variety of reasons. As a result of these unique challenges, the successful quantification of {sup 79}Se in the types of matrices present at SRS requires an extremely efficient and selective separation of {sup 79}Se from high levels of interfering radionuclides. A robust {sup 79}Se radiochemical separation method has been developed at the Savannah River National Laboratory (SRNL) which is routinely capable of successfully purifying {sup 79}Se from a wide range of interfering radioactive species. In addition to a dramatic improvements in the Kd, ease, and reproducibility of the analysis, the laboratory time has been reduced from several days to only 6 hours.

Diprete, D; C Diprete, C; Ned Bibler, N; Cj Bannochie, C; Michael Hay, M

2009-03-16T23:59:59.000Z

456

Preliminary Review of Safety Assessment Issues at Savannah River Site, August 2011  

Science Conference Proceedings (OSTI)

At the request of Savannah River Nuclear Solutions (SRNS) management, a review team composed of experts in atmospheric transport modeling for environmental radiation dose assessment convened at the Savannah River Site (SRS) on August 29-30, 2011. Several issues were presented at the meeting for discussion. This is a short summary that is organized in accordance with the primary issues discussed, which is not necessarily a chronological record. Issues include: SRS Meteorological Data and its Use in MACCS2; Deposition Velocities for Particles; Deposition Velocities for Tritium; MACCS2 Dispersion Coefficients; Use of Low Surface Roughness in Open Areas; Adequacy of Meteorological Tower and Instrumentation; Displacement Height; and Validity of MACCS2 Calculations at Close-in Distances. A longer report will be issued at a later date that expands upon these topics and recommendations.

Napier, Bruce A.; Rishel, Jeremy P.; Bixler, Nathan E.

2011-09-19T23:59:59.000Z

457

MEASUREMENT AND PREDICTION OF RADIOLYTIC HYDROGEN PRODUCTION IN DEFENSE WASTE PROCESSING SLURRIES AT SAVANNAH RIVER SITE  

DOE Green Energy (OSTI)

This paper presents results of measurements and predictions of radiolytic hydrogen production rates from two actual process slurries in the Defense Waste Processing Facility (DWPF) at Savannah River Site (SRS). Hydrogen is a flammable gas and its production in nuclear facilities can be a safety hazard if not mitigated. Measurements were made in the Shielded Cells of Savannah River National Laboratory (SRNL) using a sample of Sludge Batch 3 (SB3) currently being processed by the DWPF. Predictions were made using published values for rates of radiolytic reactions producing H{sub 2} in aqueous solutions and the measured radionuclide and chemical compositions of the two slurries. The agreement between measured and predicted results for nine experiments ranged from complete agreement to 24% difference. This agreement indicates that i