Powered by Deep Web Technologies
Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 4, 2013 June 4, 2013 CX-010433: Categorical Exclusion Determination Memaloose Meadows Land Acquisition CX(s) Applied: B1.25 Date: 06/04/2013 Location(s): Oregon Offices(s): Bonneville Power Administration June 3, 2013 CX-010436: Categorical Exclusion Determination Tri-Cities Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 06/03/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration June 3, 2013 CX-010435: Categorical Exclusion Determination De Moss Substation Expansion CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration June 3, 2013 CX-010434: Categorical Exclusion Determination LaPine Substation Shunt Reactor Addition CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

2

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Bonneville Power Administration Categorical Exclusion Determinations: Bonneville Power Administration Categorical Exclusion Determinations issued by Bonneville Power Administration. DOCUMENTS AVAILABLE FOR DOWNLOAD November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration August 26, 2013 CX-010720: Categorical Exclusion Determination Monroe-Custer #2 Access Roads CX(s) Applied: B1.3

3

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 30, 2012 July 30, 2012 CX-008891: Categorical Exclusion Determination Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration July 30, 2012 CX-008890: Categorical Exclusion Determination Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration July 27, 2012 CX-008676: Categorical Exclusion Determination Four AT&T Wireless Communication Site Upgrades CX(s) Applied: B1.7, B1.19 Date: 07/27/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration

4

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 19, 2012 September 19, 2012 CX-009203: Categorical Exclusion Determination Ross Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 09/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration September 19, 2012 CX-009200: Categorical Exclusion Determination Respond to the Town of Eatonville's Land Use Review Request (LURR) CX(s) Applied: B4.7 Date: 09/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration September 14, 2012 CX-009204: Categorical Exclusion Determination Bonneville-Hood River Number 1 Danger Pole Replacement and Access Road Upgrades CX(s) Applied: B1.3 Date: 09/14/2012 Location(s): Oregon Offices(s): Bonneville Power Administration September 14, 2012 CX-009202: Categorical Exclusion Determination Port Angeles Substation Equipment Additions

5

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 6, 2012 February 6, 2012 CX-007997: Categorical Exclusion Determination Grant Consumer Power, Incorporated's Request for use of Right-of-way at Harrisburg Substation CX(s) Applied: B4.9 Date: 02/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration February 2, 2012 CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration February 2, 2012 CX-007998: Categorical Exclusion Determination Integration of Stoltze Land and Lumber Biomass Generation CX(s) Applied: B1.7 Date: 02/02/2012 Location(s): Montana Offices(s): Bonneville Power Administration

6

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 12, 2012 June 12, 2012 CX-008698: Categorical Exclusion Determination Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008697: Categorical Exclusion Determination Sale of Line Mile 1 of the 115 Kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line CX(s) Applied: B1.24 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008696: Categorical Exclusion Determination Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration June 5, 2012 CX-008702: Categorical Exclusion Determination Forest Grove-McMinnville #1 Wood Pole Replacement Projects

7

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 27, 2012 December 27, 2012 CX-009701: Categorical Exclusion Determination Williams Northwest Pipeline Land Use Review Request CX(s) Applied: B4.9 Date: 12/27/2012 Location(s): Washington Offices(s): Bonneville Power Administration December 27, 2012 CX-009700: Categorical Exclusion Determination Finely Creek and North Valley Creek Property Funding CX(s) Applied: B1.25 Date: 12/27/2012 Location(s): Montana, Montana Offices(s): Bonneville Power Administration December 21, 2012 CX-009702: Categorical Exclusion Determination Columbia Rural Electric Association Walla Walla Hydroelectric Project CX(s) Applied: B4.1 Date: 12/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration December 19, 2012 CX-009703: Categorical Exclusion Determination Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the

8

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 9, 2013 April 9, 2013 CX-010153: Categorical Exclusion Determination Chinook Property Funding - Update CX(s) Applied: B1.25 Date: 04/09/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 5, 2013 CX-010154: Categorical Exclusion Determination Digital Communication System Upgrade Project: 'D' Analog System Retirement and #WC SONET Ring CX(s) Applied: B1.19 Date: 04/05/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 3, 2013 CX-010155: Categorical Exclusion Determination Augspurger Radio Tower Replacement Project CX(s) Applied: B1.19 Date: 04/03/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 1, 2013 CX-010156: Categorical Exclusion Determination Chinook Property Funding CX(s) Applied: B1.25

9

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 16, 2013 July 16, 2013 CX-010581: Categorical Exclusion Determination Little Shell Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration July 15, 2013 CX-010738: Categorical Exclusion Determination 2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration July 10, 2013 CX-010584: Categorical Exclusion Determination Kokanee Bend South Conservation Easement Funding CX(s) Applied: B1.25 Date: 07/10/2013 Location(s): Montana Offices(s): Bonneville Power Administration July 3, 2013 CX-010587: Categorical Exclusion Determination Mariah Wind CX(s) Applied: B1.7 Date: 07/03/2013

10

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 1, 2012 May 1, 2012 CX-008153: Categorical Exclusion Determination Maupin-Tygh Valley Number 1 Pole Replacement Project CX(s) Applied: B1.3 Date: 05/01/2012 Location(s): Oregon Offices(s): Bonneville Power Administration May 1, 2012 CX-008152: Categorical Exclusion Determination Whitefish In-line Hydroelectric Project CX(s) Applied: B4.1 Date: 05/01/2012 Location(s): Montana Offices(s): Bonneville Power Administration April 30, 2012 CX-008154: Categorical Exclusion Determination In-Kind Wood Pole Replacements - Driscoll-Naselle Number 1 CX(s) Applied: B1.3 Date: 04/30/2012 Location(s): Washington Offices(s): Bonneville Power Administration April 24, 2012 CX-008156: Categorical Exclusion Determination Amended Provision of Funds to the Idaho Department of Fish and Game (IDFG)

11

Bonneville Power Administration (BPA)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Staff version which still requires senior executive review Staff version which still requires senior executive review Office of Office of Human Capita Human Capital Management Management Bonneville Power Administration Risk Informed Human Capital - Workforce Plan 2007-2009 September 15, 2006 2007 BPA Risk Informed Human Capital - Workforce Plan Table of Contents INTRODUCTION............................................................................................................. 5 Impact of the 2006 Workforce Plan ..............................................................................................6 BPA Strategic Objectives as drivers of the WP .......................................................................... 6 I. CONTEXT ................................................................................................................... 6

12

Land Record System PIA, Bonneville Power Administration | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record System PIA, Bonneville Power Administration Land Record...

13

2013 Annual Planning Summary for the Bonneville Power Administration...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration 2013 Annual Planning Summary for the Bonneville Power Administration 2013 Annual Planning Summary for the Bonneville Power Administration The...

14

PP-10-1 Bonneville Power Administrator | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

border. PP-10-1 Bonneville Power Administrator More Documents & Publications PP-10 Bonneville Power Administrator PP-30 New York Power Authority PP-305 Montana Alberta Tie Ltd...

15

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 10, 2011 March 10, 2011 CX-005419: Categorical Exclusion Determination Ostrander Line Swap CX(s) Applied: B4.11 Date: 03/10/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration March 7, 2011 CX-005418: Categorical Exclusion Determination Birch Creek Radio Tower CX(s) Applied: B4.6 Date: 03/07/2011 Location(s): Bonneville County, Idaho Office(s): Bonneville Power Administration March 7, 2011 CX-005417: Categorical Exclusion Determination Beaver Creek Property CX(s) Applied: B1.25 Date: 03/07/2011 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration March 3, 2011 CX-005411: Categorical Exclusion Determination Troutdale Substation Control House CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Troutdale, Oregon Office(s): Bonneville Power Administration

16

Bonneville Power Administration Notice of Availability of Record...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

169 Thursday, August 31, 1995 Notices Bonneville Power Administration Notice of Availability of Record of Decision for the Business Plan AGENCY: Bonneville Power Administration...

17

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 29, 2010 July 29, 2010 CX-003233: Categorical Exclusion Determination Purchase of Conservation Easements on Cottom and Beyeler Properties CX(s) Applied: B1.25 Date: 07/29/2010 Location(s): Lemhi County, Idaho Office(s): Bonneville Power Administration July 22, 2010 CX-003235: Categorical Exclusion Determination Adolfson-Feleding Property (Lavaside Property) Purchase CX(s) Applied: B1.25 Date: 07/22/2010 Location(s): Bingham County, Idaho Office(s): Bonneville Power Administration July 22, 2010 CX-003234: Categorical Exclusion Determination Demolition of Vacant House at Bonneville Power Administration's Ross Complex CX(s) Applied: B1.23 Date: 07/22/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration July 21, 2010 CX-003236: Categorical Exclusion Determination

18

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 Biological Opinions. Sincerely, Robert J. Austin Deputy Director for Fish and Wildlife Enclosures (2) cc: Mr

19

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208 or Bob Austin (503-230-4748) if you have questions about this letter or our analysis. Sincerely, William

20

Bonneville Power Administration 1991 Annual Report.  

SciTech Connect

Congress enacted the Bonneville Project Act in 1937, creating the Bonneville Power Administration to market and transmit the power produced by Bonneville Dam on the Columbia River. Since then, Congress has directed BPA to sell at wholesale the power produced at a total of 30 Federal dams in the Pacific Northwest, and to acquire conservation and generating resources sufficient to meet the needs of BPA`s customer utilities. The dams and the electrical system are known as the Federal Columbia River Power System. Bonneville sells wholesale power to public and private utilities, rural cooperatives, large industries, and Federal agencies. BPA also sells or exchanges power with utilities in California. BPA uses revenues from the sale of power and transmission services to recover its own expenses, to repay the Federal investment in the power system, and to pay for the resources it has acquired. BPA pays for operation and maintenance expenses at the Federal dams and at non-Federal power plants. It also pays for irrigation benefits of Federal projects allocated to power to repay, and for fish and wildlife projects which offset damage to these resources by the Federal hydropower system. This document is the 1991 statement of budget, financial statement, cash flows, capitalization, expenses, and projects. An organization chart is included.

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 15, 2010 September 15, 2010 CX-004876: Categorical Exclusion Determination Casa Grande-Empire (Double Circuit Upgrade) CX(s) Applied: B4.13 Date: 09/15/2010 Location(s): Pinal County, Arizona Office(s): Bonneville Power Administration September 15, 2010 CX-003906: Categorical Exclusion Determination Fiscal Year 2010 Willamette Basin Mitigation CX(s) Applied: B1.25 Date: 09/15/2010 Location(s): Eugene, Oregon Office(s): Bonneville Power Administration September 10, 2010 CX-003791: Categorical Exclusion Determination Grant Access for Filling Potholes and for Paving Existing Roadway CX(s) Applied: B1.3 Date: 09/10/2010 Location(s): Clallam County, Washington Office(s): Bonneville Power Administration September 8, 2010 CX-003908: Categorical Exclusion Determination Fiscal Year 2010 Columbia Basin Fish Accords with Colville Confederated

22

Bonneville Power Admin (Washington) | Open Energy Information  

Open Energy Info (EERE)

Bonneville Power Admin Bonneville Power Admin Place Washington Utility Id 1738 References Energy Information Administration.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Industrial: $0.0046/kWh The following table contains monthly sales and revenue data for Bonneville Power Admin (Washington). Month RES REV (THOUSAND $) RES SALES (MWH) RES CONS COM REV (THOUSAND $) COM SALES (MWH) COM CONS IND_REV (THOUSAND $) IND SALES (MWH) IND CONS OTH REV (THOUSAND $) OTH SALES (MWH) OTH CONS TOT REV (THOUSAND $) TOT SALES (MWH) TOT CONS 2009-03 2,220.339 71,908.718 8 2,220.339 71,908.718 8

23

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 5, 2011 January 5, 2011 CX-005015: Categorical Exclusion Determination Redland South and Oregon City Microwave Tower Wireless Communication Projects CX(s) Applied: B1.7, B1.19 Date: 01/05/2011 Location(s): Clackamas County, Oregon Office(s): Bonneville Power Administration December 22, 2010 CX-004850: Categorical Exclusion Determination Marion to Santiam Fiber Installation CX(s) Applied: B4.7 Date: 12/22/2010 Location(s): Marion, Oregon Office(s): Bonneville Power Administration December 13, 2010 CX-004742: Categorical Exclusion Determination De Moss-Fossil 115-Kilovolt Line Upgrade CX(s) Applied: B4.6 Date: 12/13/2010 Location(s): Wasco County, Oregon Office(s): Bonneville Power Administration December 9, 2010 CX-004744: Categorical Exclusion Determination Provision of Funds to Confederated Salish and Kootenai Tribes (CSKT) for

24

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 5, 2011 August 5, 2011 CX-006482: Categorical Exclusion Determination Swan Valley - Palisades Communication Upgrade CX(s) Applied: B1.7, B4.6 Date: 08/05/2011 Location(s): Idaho Office(s): Bonneville Power Administration August 5, 2011 CX-006481: Categorical Exclusion Determination Funding Removal of Underground Storage Tank at Nelson Springs CX(s) Applied: B6.1 Date: 08/05/2011 Location(s): Richland, Washington Office(s): Bonneville Power Administration August 3, 2011 CX-006483: Categorical Exclusion Determination Balancing Authority Area Service Agreement with Lane Electric Cooperative, Inc. CX(s) Applied: B4.1 Date: 08/03/2011 Location(s): Eugene, Oregon Office(s): Bonneville Power Administration July 26, 2011 CX-006293: Categorical Exclusion Determination Provision of Funds to the Confederated Salish and Kootenai Tribes for

25

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 16, 2010 March 16, 2010 CX-001179: Categorical Exclusion Determination Lancaster-Noxon Number 1 Mile 46-50 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/16/2010 Location(s): Bonner County, Idaho Office(s): Bonneville Power Administration March 15, 2010 CX-001180: Categorical Exclusion Determination Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/15/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration March 12, 2010 CX-001181: Categorical Exclusion Determination Santiam Substation Renovation CX(s) Applied: B1.16 Date: 03/12/2010 Location(s): Linn County, Oregon Office(s): Bonneville Power Administration

26

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 9, 2011 June 9, 2011 CX-006197: Categorical Exclusion Determination Omak Area 3G Radio Site Upgrades CX(s) Applied: B1.19 Date: 06/09/2011 Location(s): Okanogan, Washington Office(s): Bonneville Power Administration June 1, 2011 CX-005969: Categorical Exclusion Determination Provision of Funds to Montana Fish, Wildlife and Parks for Purchase of the Perry Creek Property CX(s) Applied: B1.25 Date: 06/01/2011 Location(s): Lake County, Montana Office(s): Bonneville Power Administration May 26, 2011 CX-005968: Categorical Exclusion Determination Holcomb Radio Station and Naselle Substation Communication Upgrade Project CX(s) Applied: B1.7 Date: 05/26/2011 Location(s): Pacific County, Washington Office(s): Bonneville Power Administration May 25, 2011 CX-005967: Categorical Exclusion Determination

27

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 8, 2010 June 8, 2010 CX-003092: Categorical Exclusion Determination Ross-Lexington Number 1 New Access Road Construction: 15/1 to 15/2 CX(s) Applied: B1.13 Date: 06/08/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration June 8, 2010 CX-002771: Categorical Exclusion Determination Marion and Sand Springs Substations Radio Tower Projects CX(s) Applied: B1.19 Date: 06/08/2010 Location(s): Marion, Oregon Office(s): Bonneville Power Administration June 4, 2010 CX-002773: Categorical Exclusion Determination Idaho Department of Fish and Game Purchase of Crystal Springs Trout Farm - Snake River Sockeye Captive Propagation Program CX(s) Applied: A7 Date: 06/04/2010 Location(s): Springfield, Idaho Office(s): Bonneville Power Administration June 3, 2010

28

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 2, 2009 November 2, 2009 CX-000008: Categorical Exclusion Determination Raver-Paul #1 Access Road Improvement and Bridge Replacement CX(s) Applied: B1.3 Date: 11/02/2009 Location(s): Pierce County, Washington Office(s): Bonneville Power Administration October 27, 2009 CX-000007: Categorical Exclusion Determination Spirit Tap to Colville-Boundary #1 Landings and Access Roads Construction CX(s) Applied: B1.3, B1.13 Date: 10/27/2009 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration October 8, 2009 CX-000004: Categorical Exclusion Determination Lane-Wendson #1 Structure 10/5 Access Road Improvement and Pole Replacement Project CX(s) Applied: B1.3 Date: 10/08/2009 Location(s): Lane County, Oregon Office(s): Bonneville Power Administration October 8, 2009

29

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Department of Energy Bonneville Power Administration P.O. Box 3621 Portland, Oregon 97208. Delwiche ­ KE-4 J. Stier ­ KE-4 R. Austin ­ KEW-4 G. Dondlinger ­ KEWB-4 P. Lofy ­ KEWL-4 P. Krueger ­ KEWR

30

Bonneville Power Administration 1998 Annual Report.  

SciTech Connect

This is the 1998 annual report to the President by the Administrator and Chief Executive Officer of the Bonneville Power Administration. The topics of the report include financial highlights, letter to the President, review of 1998, financial data, management`s discussion and analysis, performance measures, financial statements, BPA executives, BPA offices, BPA profile.

United States. Bonneville Power Administration.

1998-01-01T23:59:59.000Z

31

Categorical Exclusion Determinations: Bonneville Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 19, 2011 September 19, 2011 CX-006818: Categorical Exclusion Determination Grant New Cingular Wireless? Request for Use of Right-Of-Way at the Salem Substation CX(s) Applied: B4.9 Date: 09/19/2011 Location(s): Salem, Polk County, Oregon Office(s): Bonneville Power Administration September 16, 2011 CX-006820: Categorical Exclusion Determination Prosser Hatchery Storage Shed CX(s) Applied: B1.15 Date: 09/16/2011 Location(s): Prosser, Benton County, Washington Office(s): Bonneville Power Administration, Natural Gas Regulation September 16, 2011 CX-006819: Categorical Exclusion Determination Replace Aging Wood Poles on Trans Alta?s Centralia Tap to Chehalis-Covington No. 1 230-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 09/16/2011 Location(s): Lewis County, Washington

32

COMMENTS OF THE BONNEVILLE POWER ADMINISTRATION  

U.S. Energy Information Administration (EIA)

Page 2 BONNEVILLES COMMENTS ON FORM EIA-930 II. Comments A. The Proposed Collection is not Necessary for Proper Performance of EIA Functions,

33

Management of Bonneville Power Administration's Information Technology Program, IG-0861  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management of Bonneville Power Management of Bonneville Power Administration's Information Technology Program DOE/IG-0861 March 2012 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 March 26, 2012 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Management of Bonneville Power Administration's Information Technology Program" INTRODUCTION AND OBJECTIVE The Bonneville Power Administration provides about 30 percent of wholesale electric power to regional utilities that service homes, hospitals, financial institutions, commercial entities and military installations in the Pacific Northwest. Bonneville makes extensive use of various

34

Distribution: Sonya Baskerville, Liaison, Bonneville Power Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11, 2013 11, 2013 Distribution: Sonya Baskerville, Liaison, Bonneville Power Administration Karen Boardman, Health Safety and Security, Director, National Training Center Wayne Elias, Fossil Energy, Director, FE-42 Gordon Fox, Office of Science, Director, SC-31.2 Mark Gilbertson, Environmental Management, DAS, Site Restoration Larry Harp, Division of Engineering and Planning, South Western Power Administration Joshua Hill, Federal Energy Regulatory Commission, Acting Director, Logistics Mgmt. Div. Doug Hooker, Energy Efficiency and Renewable Energy, Director, GO-OMA Mary McCune, Nuclear Energy, Director, Office of Facilities Management Peter O'Konski, Office of Management, Director, Office of Administration Jessica Schwersenska, Naval Reactors Laboratory Field Office, Analyst

35

Bonneville Power Administration's YouTube Channel  

DOE Data Explorer (OSTI)

The Bonneville Power Administration is one of DOE's four power marketing administration organizations. BPA describes its mission as a public service organization as one designed create and deliver the best value for our customers and constituents as we act in concert with others to assure the Pacific Northwest: 1) An adequate, efficient, economical and reliable power supply; 2) A transmission system that is adequate to the task of integrating and transmitting power from federal and non-federal generating units, providing service to BPA's customers, providing interregional interconnections, and maintaining electrical reliability and stability; and 3) Mitigation of the Federal Columbia River Power System's impacts on fish and wildlife. The more than 100 videos on BPA's YouTube channel are organized into 12 playlists, including: Technology R&D, Renewable Energy, Hydropower, Energy Efficiency and Conservation, Transmission, Environment, Fish, and Wildlife, Vegetation Management and Public Safety, Value of the River Education Series, and Community and Education.

36

Bonneville Power Admin | Open Energy Information  

Open Energy Info (EERE)

Power Admin Power Admin Jump to: navigation, search Name Bonneville Power Admin Place Oregon Utility Id 1738 Utility Location Yes Ownership F NERC Location WECC NERC WECC Yes Operates Generating Plant Yes Activity Transmission Yes Activity Buying Transmission Yes Activity Wholesale Marketing Yes Alt Fuel Vehicle Yes Alt Fuel Vehicle2 Yes References EIA Form EIA-861 Final Data File for 2010 - File1_a[1] Energy Information Administration Form 826[2] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Utility Rate Schedules Grid-background.png IP - 12 Industrial NR - 12 Industrial PF - 12 Exchange Residential PF - 12 Public - Average Tier 1 + Tier 2 rate Residential PF - 12 Public - Average Tier 1 rate Residential

37

EA-1002: Bonneville Power Administration's Hot Springs- Garrison...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration's proposal to upgrade its operational telecommunications system...

38

PV integration in the Bonneville Power Administration balancing authority area.  

E-Print Network (OSTI)

??In this study I investigate the accuracy and necessity of the Bonneville Power Administration (BPA) PV integration tariff, which was instituted in 2011. Note that, (more)

Schumaker, Adam

2012-01-01T23:59:59.000Z

39

PP-10 Bonneville Power Administrator | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to construct, operate, and maintain electric transmission facilities at the U.S-Canada border. PP-10 Bonneville Power Administrator More Documents & Publications...

40

EIS-0312: Notice of Availability of the Bonneville Power Administratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

the Bonneville Power Administration Administrator's Record of Decision: Columbia Basin Fish Accords Memorandum of Agreement (MOA) with the Kalispel Tribe on Columbia Basin Fish...

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Bonneville Power Administration (Bpa) Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1994/01_cover.html[6/27/2011 11:57:49 AM] 1994/01_cover.html[6/27/2011 11:57:49 AM] Final Environmental Impact Statement (DOE/eis-0194) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Action: Tenaska Washington II Generation Project State Involved: Washington Abstract: BPA is considering whether to purchase electrical power from a proposed privately-owned combustion-turbine electrical generation plant in Washington. The plant would be fired by natural gas and would use combined-cycle technology to generate 240 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Tenaska Washington Partners II, L.P. The project would be located about 19 kilometers (12 miles) southeast of downtown Tacoma in the Frederickson

42

Bonneville Power Administration 1997 Annual Report.  

SciTech Connect

The Bonneville Power Administration`s 60th anniversary year exceeded expectations. Net revenues were the best since 1991, which demonstrates that earlier decisions to transform BPA into a smaller, cost-conscious, customer-focused organization were the correct decisions. The region`s evaluation of the agency`s role in the Northwest was as gratifying as the positive financial position. Through the Comprehensive Review of the Northwest Energy System, the region concluded that BPA has been and must continue to be an important economic and environmental benefit to the Northwest. BPA occupies a unique position in the region that is crystallized in the agency`s new purpose statement: to meet their public responsibilities through commercially successful businesses. The agency must be commercially successful to provide funding for public responsibilities such as its fish and wildlife program, conservation, and reliable power and transmission systems. But the heart and soul of the agency is providing benefits that reflect the public service orientation that inspired the agency`s creation 60 years ago. BPA will provide the region with power at cost, provide preference to the region because the river on which the hydro system is based is a regional resource, and continue to see that its power flows to the little guys. It is just as important that BPA deliver power to the region`s residential and rural consumers now as it was when the agency brought electricity to rural areas for the first time.

United States. Bonneville Power Administration.

1998-01-01T23:59:59.000Z

43

Continuity of Operations at Bonneville Power Administration, IG-0781 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Continuity of Operations at Bonneville Power Administration, Continuity of Operations at Bonneville Power Administration, IG-0781 Continuity of Operations at Bonneville Power Administration, IG-0781 In the event of a major disruption to its nonnal operations, Bonneville must be prepared to continue its essential functions, particularly its power scheduling, tra~lsmission scheduling, and system operations. In this regard, Bonneville is required to follow Federal Preparedness Circular 65 (FPC 65), as prescribed by the Department of Homeland Security's Federal Emergency Management Agency. Under FPC 65, agencies are to develop viable contingency plans. The Circular also provides a number of key steps that agencies should take for continuity of operations. Specifically, it recommends that each agency: ( I ) prepare alternate operating facilities; (2)

44

DOE Names Bill Drummond As New Bonneville Power Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Names Bill Drummond As New Bonneville Power Administration Names Bill Drummond As New Bonneville Power Administration Administrator DOE Names Bill Drummond As New Bonneville Power Administration Administrator January 16, 2013 - 7:00pm Addthis News Media Contact (202) 586-4940 WASHINGTON - The Energy Department has chosen Bill Drummond to be the new Administrator for the Bonneville Power Administration (BPA), one of the four Power Marketing Administrations (PMAs) the Department oversees. As BPA's Administrator, Drummond will be responsible for managing the non-profit federal agency, which markets carbon-free power from Columbia River hydroelectic dams and operates the surrounding power grid, distributing wind, nuclear and other energy to the Pacific Northwest and beyond. Drummond's leadership of BPA is part of a larger strategy for

45

The Skycrane at the Bonneville Power Administration | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Skycrane at the Bonneville Power Administration The Skycrane at the Bonneville Power Administration The Skycrane at the Bonneville Power Administration August 2, 2010 - 10:44am Addthis Daniel B. Poneman Daniel B. Poneman Deputy Secretary of Energy What does this project do? The project is now on schedule and under budget. The Skycrane helped overcome challenging environmental conditions. It also made the work safer for workers on the ground. The project is expected to employ approximately 140 people at its peak. For a striking glimpse of a power grid rapidly evolving to handle renewable power, look to the Bonneville Power Administration in the Pacific Northwest. Crews just finished using a Skycrane helicopter to assemble 65 steel towers for a new high-voltage transmission line to move wind power throughout the region.

46

Bonneville Power Administration Notice of Availability of Record...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10-12-95; 8:45 am BILLING CODE 6450-01-P Bonneville Power Administration Notice of Availability of Record of Decision for Industrial Incentive Rate Sale for Idle Pacific Northwest...

47

Bonneville Power Administration Fish & Wildlife Implementation Plan Final EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: 2: Appendices DOE/EIS-0312 April 2003 Appendix A Fish and Wildlife Funding Principles for Bonneville Power Administration Rates and Contracts Fish and Wildlife Implementation Plan EIS Appendix A: Fish and Wildlife Funding Principles Appendix A/ 1 Appendix A FISH AND WILDLIFE FUNDING PRINCIPLES FOR BONNEVILLE POWER ADMINISTRATION RATES AND CONTRACTS September 16, 1998 Preamble The purpose of these principles is to conclude the fish and wildlife funding process in which Bonneville has been engaged with various interests in the Region, and provide a set of guidelines for structuring Bonneville's subscription and power rate processes. The principles are intended to "keep the options open" for future fish and wildlife decisions that are anticipated to be made in late 1999 on reconfiguration of the hydrosystem and in

48

Bonneville Power Administration Yakima Fisheries Project; 13Sept1996  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION YAKIMA FISHERIES PROJECT (YFP) RECORD OF DECISION Summary. As Administrator of the Bonneville Power Administration (BPA), I have decided to implement Alternative 2 of the proposed Yakima Fisheries Project (YFP) to undertake fishery research and mitigation activities in the Yakima River Basin in south- central Washington. The project responds directly to a need for knowledge of viable means to rebuild and maintain naturally spawning anadromous fish stocks in the Yakima Basin. Alternative 2 would experimentally supplement depressed populations of upper Yakima spring chinook salmon that spawn naturally, as well as undertake a study to determine the feasibility of re-establishing a naturally spawning population and significant fall fishery for coho salmon (now eliminated in the Basin).

49

Bonneville Power Administration 1993 Annual Report.  

SciTech Connect

For the first time in a decade, Bonneville had to propose a double digit rate increase in 1993. Many of the causes were beyond our control, but self-examination and painful budget cuts put the focus squarely where it should be -- on the changes needed for BPA to compete in an increasingly market-driven business environment. As deregulation and change sweep the electricity industry, BPA has launched a major Competitiveness Project. It`s clear that we can, and will, cut costs and make ourselves more efficient. We can shape our products and services to better reflect what customers want and are willing to pay for. And more than ever we will measure and reward output -- results -- more than process. BPA today is the Northwest`s low-cost supplier of electricity and transmission services. To stay that way, we must adopt a more business-like model. The move does not signal a rejection of our role as a federal agency. In fact, close attention to sound business principles is the only way to strengthen our commitment to fish and wildlife, environment, and other community values.

United States. Bonneville Power Administration.

1994-01-01T23:59:59.000Z

50

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Wind Power Forecasting andWind Power Forecasting and Electricity Market Operations Audun Botterud (point forecast ­ 10% quantile forecast) Det. Point R3 Det. UC w/additional reserve (15% of load) Det Stochastic UC w/additional reserve (15% of load) Stoch. Scenarios #12;Wind Power Forecast Day-ahead point

51

STATEMENT FOR THE RECORD BONNEVILLE POWER ADMINISTRATION BEFORE THE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOR THE RECORD FOR THE RECORD BONNEVILLE POWER ADMINISTRATION BEFORE THE COMMITTEE ON ENERGY AND NATURAL RESOURCES UNITED STATES SENATE JUNE 20, 2013 REGARDING RESOURCE ISSUES IN THE KLAMATH RIVER BASIN The U.S Department of the Interior's Bureau of Reclamation (Reclamation) has approached the Bonneville Power Administration (BPA) with a request to provide Federal power service to the Klamath Basin Irrigation Project's load. This request was made to the Administrator by letter received on August 27, 2009, requesting a contract(s) for the purchase and delivery of power to serve existing Reclamation load within the Klamath Project in Oregon. The letter noted the load was approximately 10 average megawatts and currently is served by PacifiCorp. The Klamath

52

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

Idaho Department of Fish and Game 600 S. Walnut P.O. Box 25 Boise, ID 83707 Re: Redirection of Idaho Accord Funds Dear Mr. Schriever: BPA Power Administration (BPA) received the Idaho Department of Fish and Game (IDFG) request to reallocate funding within the Idaho Fish Accord executed on May 2, 2008

53

Report on Audit of Bonneville Power Administration's Energy Resource Programs, IG-0379  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1995 1995 IG-1 INFORMATION: Report on "Audit of Bonneville Power Administration's Energy Resource Programs" The Secretary BACKGROUND: Bonneville Power Administration (Bonneville) was established to market and transmit hydroelectric power produced at the Bonneville Dam. Since then, Bonneville has acquired additional resources and, today, markets the power from 30 Federal dams and 1 non-federal nuclear plant in the Pacific Northwest. In April 1994, Bonneville entered into a 20-year contract to purchase the electrical output from a natural gas fired combustion turbine facility at a total cost of about $2.2 billion. Bonneville's resource acquisitions were to be made only after its planning process showed that demand for its electricity would exceed its available resources. In

54

EA-1002: Bonneville Power Administration's Hot Springs- Garrison Fiber Optic Project, Montana  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration's proposal to upgrade its operational telecommunications system between the Hot...

55

Bonneville Power Administration Communication Alarm Processor (CAP). Final report  

Science Conference Proceedings (OSTI)

Power systems operations and maintenance currently face an ever-increasing need for a high level of computerized support. This paper is the final report of a research and development effort undertaken by the Bonneville Power Administration to develop a computerized decision support system to aid operations and maintenance personnel isolate and diagnose faults on a microwave communication system used for centralized dispatch operations. The system, called CAP for Communication Alarm Processor, provides statistical analysis of microwave communication system alarms, as well as an expert system capability for fault isolation and diagnosis. CAP is implemented on a DEC VAX Station 3100 computer, utilizing both knowledge-based programming principles as well as conventional programming techniques.

MacGregor, D.G. [MacGregor-Bates, Inc., Eugene, OR (United States); Goeltz, R. [Oak Ridge National Lab., TN (United States)

1995-01-01T23:59:59.000Z

56

Bonneville Power Administration Fish & Wildlife Implementation Plan Final EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1: 1: Environmental Analyses DOE/EIS-0312 April 2003 Fish and Wildlife Implementation Plan Final Environmental Impact Statement (DOE/EIS-0312) Responsible Agency: U.S. Department of Energy (DOE), Bonneville Power Administration (BPA) Title of Proposed Action: Fish and Wildlife Implementation Plan States and Provinces Involved: Arizona, California, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, Wyoming, and British Columbia Abstract: Despite the efforts of BPA and other regional entities in the Pacific Northwest, some populations of fish and wildlife continue to decline. Reasons for the lack of success include the following: different groups have different values and priorities; there is no clear and agreed-upon scientific answer; and there are conflicting

57

Pressurization test results: Bonneville Power Administration Energy Conservation Study  

SciTech Connect

Results are presented of air leakage measurements in 18 single-family detached houses at the Midway substation, Hanford, Washington, performed as part of the Bonneville Power Administration's Energy Conservation Study. The change in energy consumption following various retrofit strategies is compared. Air leakage was measured in each house with the fan pressurization technique, before and after the retrofits were installed. No significant change was found in infiltration rates in those houses receiving either no retrofits or insulation only; and average reduction of 17% in leakage area was found in the houses retrofitted with storm doors and windows. There appears to be great potential for further savings in energy use from reduced infiltration, and the study is being extended to investigate this.

Krinkel, D.L.; Dickeroff, D.J.; Casey, J.; Grimsrud, D.T.

1980-12-01T23:59:59.000Z

58

Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.  

DOE Green Energy (OSTI)

Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

United States. Bonneville Power Administration.

1996-08-01T23:59:59.000Z

59

Bonneville Power Administration`s Commercial Sector Conservation Market.  

SciTech Connect

Bonneville has, as part of its resource plan, accepted targets for commercial conservation which are quite ambitious. To meet these targets, Bonneville will need to acquire as much cost-effective conservation as possible over the next twelve years. With this in mind, this document explores the relative importance of different commercial market segments and the types of assistance each market needs to install as many cost-effective conservation measures in as many buildings as possible. This document reviews Bonneville`s marketing environment and position, and suggests goals for commercial sector conservation marketing at Bonneville. Then it presents a broad market segmentation and series of additional demographic analyses. These analyses assess what groups of consumers Bonneville must reach to achieve most of the commercial conservation potential and what is needed to reach them. A final section reviews the success of Bonneville programs at reaching various markets. The market segmentation identifies different types of consumers and opportunities which would require distinct program approaches. Four large market segments are identified that have distinct program needs. Then four ``building life-cycle events`` are identified which provide important conservation opportunities and also require distinct program services. This creates a matrix of 16 cells which delineate distinct needs for program marketing. Each of the four key market segments manages at least 20% of the Region`s commercial floorspace.

Gordan, Frederick M. [Pacific Energy Associates, Inc. (United States)

1992-11-10T23:59:59.000Z

60

Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power Administration  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Special Inquiry Report Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power Administration DOE/IG-0895 October 2013 Department of Energy Washington, DC 20585 October 3, 2013 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Special Inquiry: "Review of Allegations Regarding Prohibited Personnel Practices at the Bonneville Power Administration" BACKGROUND The Department of Energy's Bonneville Power Administration (Bonneville) is a self-funding entity that covers its costs by marketing wholesale electrical power from 31 Federal hydro projects. It is responsible for operating and maintaining about three-fourths of the high-voltage transmission in the Pacific Northwest. Bonneville's 3,100 employees represent 20 percent of the

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Report on audit of Bonneville Power Administration`s energy resource programs  

SciTech Connect

The Bonneville Power Administration (Bonneville) must ensure that the costs of its contracts for energy resources are as low as reasonably possible and that the resources are needed. During the audit, we reviewed Bonneville`s energy resource programs and focused on its purchase of electrical output from natural gas fired combustion turbines. The objective of this audit was to determine if Bonneville paid excessive costs to acquire the electrical output from combustion turbine facilities. The audit showed that Bonneville contracted to purchase the output from a combustion turbine facility at excessive cost, and that the electricity was not needed. The cost of the electricity under this contract exceeded the amount of revenue Bonneville could obtain by selling it. Bonneville estimated it would operate the generation facility for only 6 months of the year; the contract, however, required Bonneville to pay the fixed costs of the facility during the other 6 months. Consequently, the cost of the electricity plus the fixed costs in the first year of the contract would exceed revenues by $20.9 million. The contract also contained cost escalators that exceeded the rate of inflation. These cost escalators combined with the excessive initial cost resulted in projected excessive costs of $146.8 million in the first 5 years of the contract, Finally, the contract was not needed due to competition from similar facilities and a desire by customers to diversify their sources of electricity.

1995-09-08T23:59:59.000Z

62

Evaluation of the Super Efficient Refrigerator Program (SERP) in the Bonneville Power Administration service territory  

Science Conference Proceedings (OSTI)

The Super Efficient Refrigerator Program (SERP) is a collaborative utility program intended to transform the market for energy-efficient and environmentally friendly refrigerators. it is one of the first examples of large-scale {open_quotes}market transformation{close_quotes} energy efficiency program. This report documents the evaluation of SERP ({open_quotes}the Program{close_quotes}) in the Bonneville Power Administration`s (Bonneville`s) service territory. Pacific Northwest National Laboratory (PNNL) conducted this evaluation for Bonneville. This study includes the process evaluation, preliminary impact evaluation, and market transformation assessment. It is based on site visits and interviews with refrigerator dealers and manufacturers, industry data, and Bonneville information. Results from this study are compared with those from a parallel study that examines the Program across the 24 participating utilities.

Lee, A.D.; Conger, R.L.

1996-06-01T23:59:59.000Z

63

Bonneville Power Administration South Oregon Coast Reinforcement Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Federal Register / Vol. 63, No. 61 / Tuesday, March 31, 1998 / Notices President of Utility Contracting, Citizens Power Sales, 160 Federal Street, Boston, Massachusetts 02110. A final decision will be made on this application after the environmental impacts have been evaluated pursuant to the National Environmental Policy Act of 1969, and a determination is made by the DOE that the proposed action will not adversely impact on the reliability of the U.S. electric power supply system. Copies of this application will be made available, upon request, for public inspection and copying at the address provided above. Issued in Washington, DC on March 24, 1998. Anthony J. Como, Manager, Electric Power Regulation, Office of Coal and Power Im/Ex, Office of Coal and Power Systems, Office of Fossil Energy.

64

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Statement DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (DOE/EIS-0285) Responsible Agency: Bonneville Power Administration (Bonneville), U.S. Department of Energy Cooperating Agencies: U.S. Forest Service (FS), U.S. Department of Agriculture; Bureau of Land Management (BLM), U.S. Department of Interior Title of Proposed Action: Transmission System Vegetation Management Program States Involved: California, Idaho, Montana, Oregon, Utah, Washington, and Wyoming Abstract: Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation.

65

Audit of Bonneville Power Administration's Management of Information Resources, WR-B-96-06  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AUDIT OF BONNEVILLE POWER ADMINISTRATION'S MANAGEMENT OF INFORMATION RESOURCES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov Department of Energy Human Resources and Administration Home Page http://www.hr.doe.gov/ig

66

30 MJ superconducting magnetic energy storage performance on the Bonneville Power Administration utility transmission system*  

DOE Green Energy (OSTI)

The 30 MJ, 10 MW superconducting magnetic energy storage (SMES) system was devised to interact in the Western U.S. Power System as an alternate means to damp unstable oscillations at 0.35 Hz on the Pacific HVAC Intertie. The SMES unit was installed at the Tacoma Substation of the Bonneville Power Administration (BPA). The operating limits of the 30 MJ SMES unit were established, and different means of controlling real and reactive power were tested. The unit can follow a sinusoidal power demand signal with an amplitude of up to 8.6 MW with the converter working in a 12 pulse mode. When the converter operates in the constant VAR mode, a time varying real power demand signal of up to 5 MW can be met. Experiments showed that the Pacific AC Intertie has current and reactive power variations of the same frequency as the modulating frequency of the SMES device. Endurance tests were run to assess the reliability of the SMES subsystems with a narrow band noise input, which is characteristic of the modulation signal for stabilizer operation. In this mode, the energy of the power spectrum is not concentrated at one frequency to avoid exciting a resonance frequency of the ac transmission system. During the endurance tests, parameters of the ac power system were determined. Accurate power system data are necessary for tuning the control algorithm so that the SMES unit can operate in the closed loop stabilizer mode.

Rogers, J.D.; Boenig, H.J.

1984-08-01T23:59:59.000Z

67

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration  

Science Conference Proceedings (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

68

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement - Appendices Statement - Appendices DOE/EIS-0285 Arrow-leaf Balsamroot Cooperating Agencies Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement DOE/EIS-0285 APPENDICES May 2000 Table of Contents Appendix A - Public Involvement: Publications Appendix B - Biological Weed Control Agents Appendix C - Bonneville Pesticide Applicator Certification Plan Appendix D - Sample Educational Information Appendix E - Clearance Criteria Appendix F - FS Mitigation Measures and Background Appendix G - BLM Mitigation Measures and Background Appendix H - Herbicide Fact Sheets 2,4-D Azafenidin Bromacil Chlorsulfuron Clopyralid Dicamba Dichlobenil Diuron Fosamine Ammonium Glyphosate Halosulfuron-methyl Hexazinone Imazapyr Isoxaben Mefluidide Metsulfuron-methyl

69

Application of EPRI's Transmission Reliability Evaluation for Large-Scale Systems (TRELSS) Program to Bonneville Power Administration System  

Science Conference Proceedings (OSTI)

Delivering power at the lowest cost while maintaining an acceptable level of reliability requires careful transmission planning. EPRI's Transmission Reliability Evaluation for Large-Scale Systems (TRELSS) can be used to analyze and quantify the reliability of bulk power systems to help determine the need for new transmission facilities. This report presents the results of reliability analyses for Bonneville Power Administration (BPA) using the TRELSS program.

1997-11-11T23:59:59.000Z

70

Bonneville Power Administration, Office of Engineering 10-Year Plan, 1992-2001 : Draft.  

SciTech Connect

For over 50 years, the Bonneville Power Administration (BPA) has evolved to supply electric power to more than 170 customer utilities and direct service industries across 14,800 miles of high voltage transmission lines. BPA's Office of Engineering provides the planning, development, and engineering for the required expansion, upgrade, and replacement of the transmission system. The purpose of this 10-Year Plan is to present strategies to maintain a reliable energy delivery system within changing public, business, technological, and environmental climates. The issues and trends discussed in this document and our strategies for addressing them provide the background for the Office of Engineering programs and projects. With a budget in the hundreds of millions annually and increasing public concern, we welcome the opportunity to communicate with our customers. In addition to the factors, trends and issues described in this document are two appendices containing project costs and program and staffing levels. These figures are preliminary with estimates current as of May 13, 1992.

United States. Bonneville Power Administration. Office of Engineering.

1992-05-01T23:59:59.000Z

71

Design and operation of the 30-MJ superconducting magnetic-storage system on the Bonneville Power Administration bus  

DOE Green Energy (OSTI)

A superconducting magnetic-energy-storage (SMES) unit is suitable for power-system stabilization because it can provide positive damping by absorbing or releasing energy with a relatively fast response time, 10 ms. In the fall of 1982, an SMES unit was installed at the Tacoma Substation of the Bonneville Power Administration as an experiment in monitoring, predicting and improving system stability. This paper reports principally on the system testing.

Schermer, R.I.; Barron, M.H.; Boenig, H.J.; Brown, R.R.; Criscuolo, A.L.; Cumming, C.J.; Dean, J.W.; Hassenzahl, W.V.; Rogers, J.D.; Seamons, M.J.

1983-01-01T23:59:59.000Z

72

DOE/EIS-0285; Bonneville Power Administration Transmission System Vegetation Management Program Final Environmental Impact Statement (May 2000)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Purpose, Need and Issues Purpose, Need and Issues S-1 Summary In this summary: ΠPurpose, Need, and Issues ΠMethods and Their Impacts ΠPlanning Steps ΠProgram Alternatives and Their Impacts Purpose, Need and Issues Bonneville Power Administration (Bonneville) is responsible for maintaining a network of 15,000 miles of electric transmission lines and 350 substations. This electric transmission system operates in seven states of the Pacific Northwest. (See Figure S-1.) Those states offer a great diversity of vegetation (from trees to brush to grasses), which can interfere with electric power flow, pose safety problems for us and neighboring members of the public, or interfere with our ability to maintain our system. We need to keep vegetation a safe distance away from our electric power facilities and control

73

Comparison of Energy Information Administration and Bonneville Power Administration load forecasts  

SciTech Connect

Comparisons of the modeling methodologies underlying the project Independence Evaluation System (PIES) and the Bonneville Power Administration forecasts are discussed in this paper. This Technical Memorandum is presented in order to reconcile apparent inconsistencies between the forecasts. These represent different purposes for the modeling effort as well as different forecasts. Nonetheless, both are appropriate within the context that they are intended. The BPA forecasts are site-specific, detailed, micro-level, yearly forecasts of the demand for electricity. PIES develops regional, macro forecasts and does not contain estimates of the timing of the completion of plants within the period of the forecast. The BPA forecast is intended to be utilized in analyzing a sub-regional capacity expansion program. PIES is a regional energy market-clearing, non-normative model which allows different scenarios to be compared by changing input variables. Clearly, both forecasts are dependent upon the accuracy of the assumptions and input variables included. However, the differing levels of aggregation and objectives require different types of input variables.

Reed, H.J.

1978-06-01T23:59:59.000Z

74

Bonneville Power Administration Transmission System Vegetation Management Program - Final Environmental Impact Statement  

SciTech Connect

Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from our electric facilities; (2) increase our program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This Final Environmental Impact Statement (FEIS) establishes Planning Steps for managing vegetation for specific projects (to be tiered to this Environmental Impact Statement (EIS)). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed manual, mechanical, herbicide, and biological. Also evaluated are 23 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, we consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would favor a management approach that fosters low-growing plant communities.

N /A

2000-06-23T23:59:59.000Z

75

Bonneville Power Administration Transmission System Vegetation Management Program Draft Environmental Impact Statement  

Science Conference Proceedings (OSTI)

Bonneville is responsible for maintaining a network of 24,000 kilometers (km) or 15,000 miles (mi.) of electric transmission lines and 350 substations in a region of diverse vegetation. This vegetation can interfere with electric power flow, pose safety problems for us and the public, and interfere with our ability to maintain these facilities. We need to (1) keep vegetation away from the electric facilities; (2) increase the program efficiency and consistency; (3) review herbicide use (under increased public scrutiny); and (4) maximize the range of tools we can use while minimizing environmental impact (Integrated Vegetation Management). This DEIS establishes Planning Steps for managing vegetation for specific projects (to be tiered to this EIS). In addition to No Action (current practice), alternatives are presented for Rights-of-way, Electric Yards, and Non-electric Facilities (landscaping, work yards). Four vegetation control methods are analyzed: manual, mechanical, herbicide, and biological. Also evaluated are 24 herbicide active ingredients and 4 herbicide application techniques (spot, localized, broadcast, and aerial). For rights-of-way, they consider three sets of alternatives: alternative management approaches (time-driven or establishing low-growing plant communities); alternative method packages; and, if herbicides are in a methods package, alternative vegetation selections (noxious weeds, deciduous, or any vegetation). For electric yards, one herbicide-use alternative is considered. For non-electric facilities, two method package alternatives are considered. For rights-of-way, the environmentally preferred alternative(s) would use manual, mechanical, and biological control methods, as well as spot and localized herbicide applications for noxious and deciduous plant species; the BPA-preferred alternative(s) would add broadcast and aerial herbicide applications, and would use herbicides on any vegetation. Both would factor a management approach that fosters low-growing plant communities.

N /A

1999-08-20T23:59:59.000Z

76

Results of the Bonneville Power Administration weatherization and tightening projects at the Midway substation residential community  

Science Conference Proceedings (OSTI)

As part of a regional conservation program, the Bonneville Power Administration retrofitted 18 houses at its Midway substation in central Washington and monitored the results for a three year period. The 18 houses were divided into three groups, or cells. During the first year of the project, energy consumption was monitored but no changes were made to the houses. Prior to the second year of the project, Cell 2 received attic and crawlspace insulation, foundation sill caulking, and increased attic ventilation. Cell 3 received these retrofits plus storm windows and doors, and Cell 1 served as the control group. Before the beginning of the project's third year, each house in Cell 1 received 22 hours of infiltration reduction weatherization or house tightening. Each house in Cell 3 received 10 hours of this same type of weatherization. Cell 2 served as the control group for the house doctoring phase of the project. Energy consumption and weather data were monitored for the entire three year period. Before and after each set of retrofits, leakage area measurements were made using blower door fan pressurization, thereby allowing calculation of heating season infiltration rates. An energy use model correlating energy consumption with outside temperature was developed in order to determine improvements to the thermal conductance of the building envelope as a result of the retrofits. Energy savings were calculated based on the results of the energy use model and, as a check on these findings, the Computerized Instrumented Residential Analysis (CIRA) load calculation program developed at Lawrence Berkeley Laboratory provided a theoretical estimate of the savings resulting from the retrofits.

Dickinson, J.B.; Grimsrud, D.T.; Krinkel, D.L.; Lipschutz, R.D.

1982-02-01T23:59:59.000Z

77

Information System Development Practices at the Bonneville and...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Information System Development Practices at the Bonneville and Western Area Power Administrations, IG-0586 Information System Development Practices at the Bonneville and Western...

78

Operation of the 30 MJ superconducting magnetic energy storage system in the Bonneville Power Administration Electrical Grid  

DOE Green Energy (OSTI)

The 30 MJ superconducting magnetic energy storage (SMES) system was installed in the Bonneville Power Administration (BPA) Tacoma Substation in 1982 to 1983. Operation of the unit since that time has been for over 1200 hours. Specific tests to explore the SMES system's thermal and electrical characteristics and the control functions were conducted. The coil heat load with current modulation was determined. A converter with two 6-pulse bridges interfaces the superconducting coil to the power bus. Equal bridge voltage amplitude and constant reactive power modes of operation of the system were run with computer control of the SCR bridge firing angles. Coil energy dump tests were performed. Electrical grid system response to SMES modulation was observed, and full power SMES modulation was undertaken.

Rogers, J.D.; Boenig, H.J.; Schermer, R.I.; Hauer, J.F.

1984-01-01T23:59:59.000Z

79

Operation of the 30 MJ superconducting magnetic energy storage system in the Bonneville Power Administration Electrical Grid  

SciTech Connect

The 30 MJ superconducting magnetic energy storage (SMES) system was installed in the Bonneville Power Administration (BPA) Tacoma Substation in 1982 to 1983. Operation of the unit since that time has been for over 1200 hours. Specific tests to explore the SMES system's thermal and electrical characteristics and the control functions were conducted. The coil heat load with current modulation was determined. A converter with two 6-pulse bridges interfaces the superconducting coil to the power bus. Equal bridge voltage amplitude and constant reactive power modes of operation of the system were run with computer control of the SCR bridge firing angles. Coil energy dump tests were performed. Electrical grid system response to SMES modulation was observed, and full power SMES modulation was undertaken.

Rogers, J.D.; Boenig, H.J.; Schermer, R.I.; Hauer, J.F.

1984-01-01T23:59:59.000Z

80

Feasibility study: Application of RCM techniques for substation maintenance at the Bonneville Power Administration. [Reliability Centered Maintenance (RCM)  

Science Conference Proceedings (OSTI)

This feasibility study examines reliability centered maintenance (RCM) as it applies to Bonneville Power Administrations (BPA) substation maintenance program. Reliability techniques are examined in evaluated. Existing BPA equipment maintenance procedures are documented. Equipment failure history is considered. Economic impacts are estimated. Various equipment instrumentation methods are reviewed. Based on this analysis a prototype system is proposed. The prototype will be implemented in two phases. Phase 1 is to be completed in 1992, it includes instrumenting one power transformer and one oil circuit breaker. Software development will focus on displaying data. Phase 2 is to be completed the following year. The remaining transformers and breakers will be instrumented during the second phase. Software development will focus on predictive maintenance techniques and maintenance decision support.

Purucker, S.L.; Tonn, B.E.; Goeltz, R.T.; James, R.D.; Kercel, S.; Rizy, D.T.; Simpson, M.L.; Van Dyke, J.W.

1992-05-28T23:59:59.000Z

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Demonstration Assessment of Light-Emitting Diode (LED) Retrofit Lamps at the Lobby of the Bonneville Power Administration, Portland, OR  

SciTech Connect

This report describes the process and results of a demonstration of solid-state lighting (SSL) technology in the lobby of the Bonneville Power Administration (BPA) headquarters building in Portland, Oregon. The project involved a simple retrofit of 32 track lights used to illuminate historical black-and-white photos and printed color posters from the 1930s and 1940s. BPA is a federal power marketing agency in the Northwestern United States, and selected this prominent location to demonstrate energy efficient light-emitting diode (LED) retrofit options that not only can reduce the electric bill for their customers but also provide attractive alternatives to conventional products, in this case accent lighting for BPA's historical artwork.

Miller, Naomi

2011-07-01T23:59:59.000Z

82

Tests with a line-commutated converter as a variable inductive load on the Bonneville Power Administration transmission system  

DOE Green Energy (OSTI)

A twelve-pulse, line-commutated converter, with a steady-state rating of 2.5 kV and 5.5 kA, formerly used for charging and discharging a superconducting magnet, was reconfigured as a static reactive power load. Tests staged at the Tacoma, WA, substation of the Bonneville Power Administration (BPA) revealed that the converter could be used as a variable inductive load, provided a stable current controller was installed. The unit was modulated as a variable VAR load following a sinusoidal VAR demand signal with an amplitude up to 14.8 MVAR. The total losses at maximum VAR output were 370 kW. This paper explains the necessary modifications of the converter to operate as a variable reactive load. Measured current waveshapes are analyzed. The effects of such a load on the BPA transmission system are presented.

Boenig, H.J.; Hauer, J.F.; Nielsen, R.G.

1986-01-01T23:59:59.000Z

83

Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision (DOE/EIS-0317) (7/21/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Bonneville Power Administration Bonneville Power Administration Kangley-Echo Lake Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Kangley-Echo Lake Transmission Line Project in King County, Washington. BPA has decided to implement the Proposed Action (Alternative 1) identified in the Kangley-Echo Lake Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0317-S1, June 2003). This decision is made thirty (30) days after publication of the notice for a final EIS (June 20, 2003) in the Federal Register. The Proposed Action consists of constructing a new 500-kilovolt (kV) transmission line from a tap point on an existing 500-kV line near Kangley, Washington, to BPA's Echo Lake

84

Bonneville Power Administration Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Grand Coulee-Bell 500-kV Transmission Line Project Grand Coulee-Bell 500-kV Transmission Line Project Record of Decision Decision The Bonneville Power Administration (BPA) has decided to construct the proposed Grand Coulee-Bell 500-kV Transmission Line Project in Douglas, Grant, Lincoln, and Spokane Counties, Washington. BPA has decided to implement the proposed action identified in the Grand Coulee-Bell 500-kV Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0344, December 2002). The proposed action consists of constructing a new 500- kilovolt (kV) transmission line between the Bureau of Reclamation's (BOR) Grand Coulee 500- kV Switchyard near Grand Coulee, Washington, and BPA's Bell Substation near Spokane, a distance of 84 miles. The proposed action involves removing an existing 115-kV transmission

85

DOE/EIS-0333; Draft NEPA/SEPA Environmental Impact Statement Bonneville Power Administration, Benton County, Washington (03/2002)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1520 Kelly Place 1520 Kelly Place Walla Walla, Washington 99362 March 26, 2002 In reply refer to: PTS/Walla Walla To: People Interested in the Maiden Wind Farm We would like to hear from you about Bonneville Power Administration (BPA) and Benton County's Draft Environmental Impact Statement (EIS) for the Maiden Wind Farm. If you requested a copy of the Draft EIS or Summary, it is enclosed for your review. Comments will be accepted until May 15, 2002. The Draft EIS describes the proposed project, tells why it may be needed, discusses the environmental and social impacts the project could create, and lists the mitigation measures that would lessen or eliminate those impacts. We greatly appreciate your time in reviewing the document and giving us

86

Air quality analysis and related risk assessment for the Bonneville Power Administration's Resource Program Environmental Impact Statement  

SciTech Connect

The Bonneville Power Administration (BPA) is considering 12 different alternatives for acquiring energy resources over the next 20 years. Each of the alternatives utilizes a full range of energy resources (e.g., coal, cogeneration, conservation, and nuclear); however, individual alternatives place greater emphases on different types of power-producing resources and employ different timetables for implementing these resources. The environmental impacts that would result from the implementation of each alternative and the economic valuations of these impacts, will be an important consideration in the alternative selection process. In this report we discuss the methods used to estimate environmental impacts from the resource alternatives. We focus on pollutant emissions rates, ground-level air concentrations of basic criteria pollutants, the acidity of rain, particulate deposition, ozone concentrations, visibility attenuation, global warming, human health effects, agricultural and forest impacts, and wildlife impacts. For this study, pollutant emission rates are computed by processing BPA data on power production and associated pollutant emissions. The assessment of human health effects from ozone indicated little variation between the resource alternatives. Impacts on plants, crops, and wildlife populations from power plant emissions are projected to be minimal for all resource alternatives.

Glantz, C S; Burk, K W; Driver, C J; Liljegren, J C; Neitzel, D A; Schwartz, M N; Dana, M T; Laws, G L; Mahoney, L A; Rhoads, K

1992-04-01T23:59:59.000Z

87

Operational Impacts of Wind Energy Resources in the Bonneville Power Administration Control Area - Phase I Report  

SciTech Connect

This report presents a methodology developed to study the future impact of wind on BPA power system load following and regulation requirements. The methodology uses historical data and stochastic processes to simulate the load balancing processes in the BPA power system, by mimicking the actual power system operations. Therefore, the results are close to reality, yet the study based on this methodology is convenient to conduct. Compared with the proposed methodology, existing methodologies for doing similar analysis include dispatch model simulation and standard deviation evaluation on load and wind data. Dispatch model simulation is constrained by the design of the dispatch program, and standard deviation evaluation is artificial in separating the load following and regulation requirements, both of which usually do not reflect actual operational practice. The methodology used in this study provides not only capacity requirement information, it also analyzes the ramp rate requirements for system load following and regulation processes. The ramp rate data can be used to evaluate generator response/maneuverability requirements, which is another necessary capability of the generation fleet for the smooth integration of wind energy. The study results are presented in an innovative way such that the increased generation capacity or ramp requirements are compared for two different years, across 24 hours a day. Therefore, the impact of different levels of wind energy on generation requirements at different times can be easily visualized.

Makarov, Yuri V.; Lu, Shuai

2008-07-15T23:59:59.000Z

88

Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 (DOE/EIS-0183) (05/31/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SUPPLEMENT TO ADMINISTRATOR'S RECORD OF DECISION ON SUPPLEMENT TO ADMINISTRATOR'S RECORD OF DECISION ON BONNEVILLE POWER ADMINISTRATION'S SERVICE TO DIRECT SERVICE INDUSTRIAL (DSI) CUSTOMERS FOR FISCAL YEARS 2007-2011 ADMINISTRATOR'S RECORD OF DECISION Bonneville Power Administration U.S. Department of Energy May 31, 2006 1 Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 I. Background On February 4, 2005, Bonneville Power Administration (BPA) sent a letter to customers and constituents describing a public process for comments on certain issues related to service by BPA to its remaining direct service industrial (DSI) customers that had not been finally decided in the Policy For Power Supply Role For Fiscal Years 2007-

89

Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 (DOE/EIS-0183) (06/19/06)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

266 Federal Register 266 Federal Register / Vol. 71, No. 117 / Monday, June 19, 2006 / Notices Education, Room 5C141, 400 Maryland Avenue, SW., Washington, DC 20202. [FR Doc. 06-5528 Filed 6-16-06; 8:45 am] BILLING CODE 4000-01-M DEPARTMENT OF ENERGY Bonneville Power Administration Supplement to Administrator's Record of Decision on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011 AGENCY: Bonneville Power Administration (BPA), Department of Energy. ACTION: Notice of final policy. SUMMARY: BPA Administrator Stephen J. Wright signed a supplement to the Administrator's Record of Decision (ROD) on Bonneville Power Administration's Service to Direct Service Industrial (DSI) Customers for Fiscal Years 2007-2011. The original

90

DOE/EIS-0312; Bonneville Power Administration, Fish and Wildlife Implementation Plan Draft EIS (5/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft EIS Draft EIS "Piecing The Puzzle Together" DOE/EIS-0312 June 2001 B i o l o g i c a l O p i n i o n s P u b l i c B e n e f i t s P a c i f i c S a l m o n T r e a t y C o l u m b i a R i v e r F i s h e r y M a n a g e m e n t P l a n S t a t e P la n s T r i b a l P l a n s A r t i f i c i a l P r o p a g a t i o n B . A . L o w e r S n a k e F e a s i b i l i t y S t u d y E I S Wy-Kan-Ush- Mi Wa- Kush-Wit P o w e r C o u n c i l P l a n M O A ( M e m o r a n d u m o f A g r e e m e n t ) F e d e r a l C a u c u s A l l H P a p e r Wildlife Program EIS F r a m e w o r k P a p e r W a t e r s h e d M g m t . P r o g r a m E I S S O R E I S ( S y s t e m O p e r a t io n s R e v i e w ) BPA Business Plan EIS I C B E M P E I S ( I n t e r io r C o l u m b ia B a s in E c o s y s t e m M g m t . P r o je c t ) Governance Structure C a n a d i a n I s s u e s P r i v a t e I n t e r e s t s C o m m e r c i a l I n t e r e s t s ? ? Volume 1: Environmental Analyses Fish and Wildlife Implementation Plan DEIS Cover Sheet Fish & Wildlife Implementation Plan Draft Environmental Impact Statement (DOE/EIS-0312) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA)

91

Bonneville Power Administration Record of Decision for the Electrical Interconnection of the Summit/Westward Project (DOE/EIS-0183) (7/25/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summit/Westward Project Summit/Westward Project July 2003 INTRODUCTION The Bonneville Power Administration (BPA) has decided to offer contract terms for interconnection of the proposed Summit/Westward Project ("Project") into the Federal Columbia River Transmission System (FCRTS) at BPA's Allston Substation. The Project, which has been proposed by Westward Energy, LLC (Westward Energy), involves construction and operation of a 520-megawatt (MW) natural-gas-fired, combined-cycle generating facility. The facility will be located in Columbia County, Oregon, about 4.5 miles north of Clatskanie, Oregon. The decision to offer terms to interconnect the Project is consistent with BPA's Business Plan Final Environmental Impact Statement (BP EIS) (DOE/EIS-0183, June 1995), and the Business Plan

92

Wide-Area Energy Storage and Management system to Balance Intermittent Resources in the Bonneville Power Administration and California ISO Control Areas  

DOE Green Energy (OSTI)

The entire project addresses the issue of mitigating additional intermittency and fast ramps that occur at higher penetration of intermittent resources, including wind genera-tion, in the Bonneville Power Administration (BPA) and the California Independent Sys-tem Operator (California ISO) control areas. The proposed Wide Area Energy Storage and Management System (WAEMS) will address the additional regulation requirement through the energy exchange between the participating control areas and through the use of energy storage and other generation resources. For the BPA and California ISO control centers, the new regulation service will look no different comparing with the traditional regulation resources. The proposed project will benefit the regulation service in these service areas, regardless of the actual degree of penetration of the intermittent resources in the regions. The project develops principles, algorithms, market integration rules, functional de-sign and technical specifications for the WAEMS system. The project is sponsored by BPA and supported in kind by California ISO, Beacon Power Corporation, and the Cali-fornia Energy Commission (CEC).

Makarov, Yuri V.; Yang, Bo; DeSteese, John G.; Lu, Shuai; Miller, Carl H.; Nyeng, Preben; Ma, Jian; Hammerstrom, Donald J.; Vishwanathan, Vilanyur V.

2008-06-30T23:59:59.000Z

93

White Sturgeon Mitigation & Restoration in the Columbia & Snake River Upstream from Bonneville Dam  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Finding of No Significant Impact (FONSI) Summary: Bonneville Power Administration (BPA) is proposing to fund the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The project proposes to continue to carry out harvest monitoring and stock status updates coordinated with fisheries management planning, annual young-of-the year recruitment indexing, research, experimental artificial propagation, and transport of white sturgeon to less densely populated areas of the river(s). Additionally, release of hatchery-reared juveniles is proposed to evaluate release

94

1992-1993 Bonneville Appliance Efficiency Program: Showerhead Evaluation Volume II - Appendices  

SciTech Connect

This report included the appendices for 1992-1993 Bonneville appliance efficiency program: showerhead evaluation. It consists of nine appendices, titled: Bonneville documents; overview of research projects; Puget Power and Light persistence study; hot-water flow analyses and assumptions documentation; regional end-use metering program; showerhead and faucet aerator performance assessment; Bonneville showerhead program distribution methods by participating utility; water- and energy-saving measure distribution methods literature review; REMP study load shape results.

Warwick, W.M.

1995-01-01T23:59:59.000Z

95

US Department of Energy, Bonneville Power Administration US Army Corps of Engineers, North Pacific Division Columbia River System Operation Review Canadian Entitlement Allocation Extension Agreements Record of Decision; April 29, 1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Columbia River System Operation Review Columbia River System Operation Review Final Environmental Impact Statement Canadian Entitlement Allocation Extension Agreements Record of Decision Summary The Administrator and Chief Executive Officer (CEO) of the Bonneville Power Administration (BPA), acting for BPA, and, as Chairman of the United States Entity (the Administrator and the Division Engineer, North Pacific Division of the United States Army Corps of Engineers), acting on behalf of the United States Entity, has decided to adopt for the Canadian Entitlement Allocation Extension Agreements (CEAEA) a federal hydroelectric projects allocation of 72.5 percent and a non-Federal hydroelectric projects allocation of 27.5 percent. The Columbia River Treaty (Treaty), ratified in 1964, required the construction of three

96

Bonneville Power Administration Power Subscription Strategy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Register / Vol. 64, No. 1 / Monday, January 4, 1999 / Notices population models to evaluate anthropogenic effects, population trends, and define a recovering or steady-state population. NMFS-SWR (1190) requests a 5-year scientific research permit to take up to 150 loggerhead, 10 green, 10 hawksbill, 25 leatherback, and 10 olive ridley sea turtles annually in the Pacific Basin for the purpose of determining take rates of sea turtles taken incidental to the Hawaiian longline fishery, and to determine the fate of sea turtles released alive after incidental capture. Trained observers may weigh, measure, flipper tag, satellite tag, tissue sample, blood sample, stomach lavage, and release sea turtles taken incidental to the Hawaiian longline fishery. This is a continuation

97

EA-0956: South Fork Snake River/Palisades Wildlife Mitigation Project, Bonneville County, Idaho  

Energy.gov (U.S. Department of Energy (DOE))

This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration proposal to fund the implementation of the South Fork Snake River Programmatic...

98

Bonneville Power Administration (Bpa) Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary-1994.html[6/27/2011 11:54:25 AM] Summary-1994.html[6/27/2011 11:54:25 AM] TABLE OF CONTENTS Section Page S.0 SUMMARY S-1 S.1 INTRODUCTION S-1 S.2 PURPOSE OF AND NEED FOR ACTION S-1 S.2.1 Need S-1 S.2.2 Purpose S-4 S.3 BACKGROUND S-4 S.4 ALTERNATIVES INCLUDING THE PROPOSED ACTION S-5 S.4.1 Proposed Action S-5

99

BPA.gov - Bonneville Power Administration  

NLE Websites -- All DOE Office Websites

Navigate Up This page location is: Agency Portal Prod - Internal Pages home Sign In About | Careers | Contact | bpa.gov Search News & Us Expand News & Us Projects & Initiatives...

100

PIA - Bonneville Power Adminstration Ethics Helpline | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Historical Records System, Office of Legacy Management iManage Strategic Integrated Procurement Enterprise System (STRIPES) PIA, Office of Procurement and Assistance Management...

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Bonneville Power Administration Fish and Wildlife Implementation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Trademark Office, Washington, DC 20231, Term-expires September 30, 2001 Jin F. Ng, Director, Patent Examining Group, Patent and Trademark Office, Washington, DC 20231,...

102

Distribution: Sonya Baskerville, Liaison, Bonneville Power Administrat...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

that are energy-efficient (Energy Star or Federal Energy Management Program (FEMP)-designated), water-efficient, biobased, environmentally preferable (e.g., Electronic...

103

Bonneville Power Administration Fish & Wildlife Implementation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

habitat quality that will support native aquatic species, achieved mainly through natural regenerative processes (Draft All-H paper Dec. 1999). Establish riparian reserves to...

104

Bonneville Power Administration Site Environmental Report, 1991.  

SciTech Connect

In 1991, in order to provide BPA`s management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA`s findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

United States. Bonneville Power Administration.

1992-06-01T23:59:59.000Z

105

Bonneville Power Administration 1991 site environmental report  

SciTech Connect

In 1991, in order to provide BPA's management with environmental information for decision making, and to comply with the National Environmental Policy Act (NEPA) of 1969, BPA completed 15 environmental impact evaluations and decision documents, with many more in progress. BPA received the results of two US Department of Energy (DOE) environmental management audits, which noted areas for improvement in our operations. We completed Action Plans in response to each DOE report. We received one administrative complaint from the US Environmental Protection Agency (EPA) concerning a 1990 spill in Arlington, Oregon, caused by a BPA subcontractor. BPA responded promptly to EPA's findings and concerns. There were 32 new spill/release incidents, most involving failure of Polychlorinated biphenyl (PCB) capacitors. Cleanup of these spills/releases has proceeded satisfactorily. BPA continued vigorous efforts to clean up substations contaminated with residuals of oil and PCB from past spills. BPA took several actions to improve our environmental performance with respect to water quality. The BPA environmental team developed a long-term schedule for environmental appraisals and audits, identifying facilities and projects that will receive audits through 1996.

Not Available

1992-06-01T23:59:59.000Z

106

Department of Energy Bonneville Power Administration  

E-Print Network (OSTI)

pending a regional review and re-invention of activities and delivery mechanisms in these program areas of this issue in the draft document, it seems more appropriate to consider it following a fuller disclosure

107

Bonneville Power Admin (Idaho) | Open Energy Information  

Open Energy Info (EERE)

Idaho Utility Id 1738 References EIA Form EIA-861 Final Data File for 2010 - File220101 LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now This...

108

Microsoft Word - CX-Bonneville-HoodRiverDangerPoleandARFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 14, 2012 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Darin Bowman Civil Engineer - TELF-TPP-3 Proposed Action: Bonneville-Hood River No. 1 Danger Pole Replacement and Access Road Upgrades Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine Maintenance Location: Hood River County, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: Upgrade access roads and landings from Structures 6/1 through 7/4 and replace danger poles on the Bonneville-Hood River No. 1 115-kV transmission line. Background This project entails improving the existing access along the Bonneville-Hood River No. 1 transmission line; maintaining existing structure landings; and replacing three danger poles and associated hardware.

109

1992-1993 Bonneville Appliance Efficiency Program: Showerhead evaluation. Volume I - report  

SciTech Connect

The Bonneville Power Administration (Bonneville) provides wholesale electric power to over 100 retail distribution utilities in the Pacific Northwest. Bonneville is faced with meeting growing loads from these utilities. It acquires conservation as one means of meeting this load growth. Bonneville has offered a variety of conservation programs since 1980. Efficient showerheads have been a feature in residential conservation programs ever since. Bonneville launched the Residential Appliance Efficiency Program to focus on water-heater energy conservation opportunities in 1992. The Residential Appliance Efficiency Program consists of two parts, a water-heater efficiency program, and a hot-water efficiency program. This report evaluates the savings and costs of the first two years of the showerhead portion of the Residential Appliance Efficiency Program (the showerhead program). Although it is not a formal evaluation of the program limited to implementation or a {open_quotes}process{close_quotes} evaluation, observations about program design and implementation are included as appropriate. Results of this evaluation are limited to program participants within the Bonneville service territory.

Warwick, W.M.

1995-01-01T23:59:59.000Z

110

Before the Subcommittee on Water and Power - House Natural Resources Committee  

Energy.gov (U.S. Department of Energy (DOE))

Subject: FY 2014 Budget Request for the Bonneville Power Administration By: William K. Drummond, Administrator, BPA

111

Microsoft Word - CX-NorthBonneville-MidwayInsulatorRep_FY13_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6, 2013 6, 2013 REPLY TO ATTN OF: KEP-Celilo SUBJECT: Environmental Clearance Memorandum Scott Williams Line Foreman III - TFDF-The Dalles Proposed Action: Insulator replacement on Bonneville Power Administration's (BPA) North Bonneville-Midway No. 1 transmission line PP&A Project No.: 2705 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions and modifications to transmission facilities Location: Skamania County, Washington Line Corridor Structures TRS County, State N. Bonneville - Midway No. 1 1/1 to 10/1 2N, 7E, Sections 3, 7, 9, 16, 39 3N, 7E, Sections 25, 35, 36 3N, 8E, Sections 28, 29, 30 Skamania, Washington Proposed by: BPA Description of the Proposed Action: In order to provide continued system reliability, BPA

112

Microsoft Word - CX-NorthBonneville75-4ReplacementWenatcheeFY12_WEB.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

KEPR/Pasco KEPR/Pasco SUBJECT: Environmental Clearance Memorandum Richard Heredia Project Manager - TEP-TPP-1 Proposed Action: North Bonneville-Midway No. 1 Tower 75/4 Replacement PP&A Project No.: 2410 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3 Routine maintenance Location: The work associated with this project will take place in the areas shown in the table below: Transmission Line/ROW Structure # Township Range Section County, State North Bonneville- Midway #1 75/4 6N 17E 14, 23 Klickitat, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace tower 75/4 on the North Bonneville-Midway No. 1 230-kilovolt (kV) transmission line to ensure the continued safe and

113

POWER MARKETING ADMINISTRATIONS'INSTALLATION OF FIBER OPTICS...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(Bonneville), Western Area Power Administration (Western), and Southwestern Power Administration (Southwestern) - own and operate transmission lines that cross 22...

114

Southwestern Power Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

FOIAPrivacy Act Submit a FOIA Request DOE FOIA Requester Service Center Electronic Reading Room FOIA Links Power Marketing Administrations' FOIA Links Bonneville Power...

115

Bonneville Environmental Foundation | Open Energy Information  

Open Energy Info (EERE)

Foundation Foundation Jump to: navigation, search Name Bonneville Environmental Foundation Address 240 SW 1st Avenue Place Portland, Oregon Zip 97204 Region Pacific Northwest Area Website https://www.b-e-f.org/ Coordinates 45.520495°, -122.671887° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.520495,"lon":-122.671887,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

116

Bonneville Project: CFD of the Spillway Tailrace  

SciTech Connect

US Army Corps of Engineers, Portland District (CENWP) operates the Bonneville Lock and Dam Project on the Columbia River. High spill flows that occurred during 2011 moved a large volume of rock from downstream of the spillway apron to the stilling basin and apron. Although 400 cubic yards of rocks were removed from the stilling basin, there are still large volumes of rock downstream of the apron that could, under certain flow conditions, move upstream into the stilling basin. CENWP is investigating operational changes that could be implemented to minimize future movement of rock into the stilling basin. A key analysis tool to develop these operational changes is a computational fluid dynamics (CFD) model of the spillway. A free-surface CFD model of the Bonneville spillway tailrace was developed and applied for four flow scenarios. These scenarios looked at the impact of flow volume and flow distribution on tailrace hydraulics. The simulation results showed that areas of upstream flow existed near the river bed downstream of the apron, on the apron, and within the stilling basin for all flows. For spill flows of 300 kcfs, the cross-stream and downstream extent of the recirculation zones along Cascade and Bradford Island was very dependent on the spill pattern. The center-loaded pattern had much larger recirculation zones than the flat or bi-modal pattern. The lower flow (200 kcfs) with a flat pattern had a very large recirculation zone that extended half way across the channel near the river bed. A single flow scenario (300 kcfs of flow in a relatively flat spill pattern) was further interrogated using Lagrangian particle tracking. The tracked particles (with size and mass) showed the upstream movement of sediments onto the concrete apron and against the vertical wall between the apron and the stilling basin from seed locations downstream of the apron and on the apron.

Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.; Romero Gomez, Pedro DJ

2012-11-19T23:59:59.000Z

117

Microsoft Word - CX-NorthBonneville-RossNorthBonneville-Troutdale_LineSwap_WEB.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4, 2011 4, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Erich Orth Civil Engineer - TEP-TPP-3 Proposed Action: North Bonneville-Ross #1 230-kV, North Bonneville-Troutdale #2 230-kV transmission line maintenance Budget Information: Work Order #00246927 PP&A Project No.: PP&A 1666 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.13 Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines approximately 20 miles in length or less to enhance environmental and land use values. Such actions include relocations to avoid right-of-way encroachments, resolve conflict with property development, accommodate road/highway construction, allow for the construction of facilities

118

Microsoft Word - NEPA_CX_WSDOT_LURR_No_20080504_SALE_North_Bonneville-Ross_ROW.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dawneen Dostert Dawneen Dostert Project Manager - TERR-LMT Proposed Action: Proposed Sale of Bonneville Power Administration (BPA) Fee Owned Property to Washington State Department of Transportation (WSDOT) for Interstate On and Off Ramps Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.24 Property Transfers Location: Vancouver, Clark County, WA, Township 2 North, Range 2 East, Section 28 and 21, Willamette Meridian Proposed by: Bonneville Power Adminitstration (BPA) Description of the Proposed Action: In response to a Land Use Review Request (LURR 20080504), BPA proposes to sell in fee 2.3 acres of land, located in Clark County, Washington, to WSDOT. The land consists of two strips within a residential area, located on either side of

119

Before House Subcommittee on Water and Power- Committee on Natural Resources  

Energy.gov (U.S. Department of Energy (DOE))

Subject: FY 2013 Spending and Missions of the Power Marketing Administrations By: Steven Wright, Administrator, Bonneville Power Administration

120

CX-008705: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Upgrade of the Secondary Containment System at Bonneville Power Administrations (BPA) Santiam Substation CX(s) Applied: B4.6 Date: 05/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Compliance Monitoring of Subyearling Chinook Salmon Smolt Survival and Passage at Bonneville Dam, Summer 2012  

SciTech Connect

The purpose of this compliance study was to estimate dam passage survival of subyearling Chinook salmon at Bonneville Dam during summer 2012, as required by the 2008 Federal Columbia River Power System Biological Opinion. The study also estimated smolt passage survival from the forebay 2 km upstream of the dam to the tailrace 1 km below the dam, as well as forebay residence time, tailrace egress, and spill passage efficiency, as required in the 2008 Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.

2013-05-01T23:59:59.000Z

122

CX-010590: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Kalispell Shunt Cap Addition Project CX(s) Applied: B4.11 Date: 07/01/2013 Location(s): Montana Offices(s): Bonneville Power Administration

123

CX-008161: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Prosser Hatchery Backup Generator Replacement CX(s) Applied: B1.31 Date: 04/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration

124

CX-010578: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Celilo Converter Station Upgrades CX(s) Applied: B4.11 Date: 07/25/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

125

CX-008691: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Mason Substation Metering Replacement Project CX(s) Applied: B1.7 Date: 06/25/2012 Location(s): Washington Offices(s): Bonneville Power Administration

126

CX-008875: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Bingen Substation Sectionalizing Switches Disposition CX(s) Applied: B1.24 Date: 08/27/2012 Location(s): Washington Offices(s): Bonneville Power Administration

127

CX-008882: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Sno-King Substation Expansion CX(s) Applied: B4.11 Date: 08/08/2012 Location(s): Washington Offices(s): Bonneville Power Administration

128

CX-010346: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Monroe Substation Integrated Project CX(s) Applied: B4.11 Date: 05/08/2013 Location(s): Washington Offices(s): Bonneville Power Administration

129

CX-010341: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Chandler Tap Line Reconductoring CX(s) Applied: B4.6 Date: 05/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration

130

CX-010589: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Nine Canyon Communication Tower Addition CX(s) Applied: B4.6 Date: 07/01/2013 Location(s): Washington Offices(s): Bonneville Power Administration

131

CX-009202: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Port Angeles Substation Equipment Additions CX(s) Applied: B4.6 Date: 09/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration

132

CX-009698: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Sale of Lakeside Radio Station CX(s) Applied: B1.24 Date: 12/27/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

133

CX-010591: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

South Yamhill Floodplain Property Funding CX(s) Applied: B1.25 Date: 06/26/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

134

CX-008699: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Old Highway Bridge Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration

135

CX-008698: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration

136

CX-010150: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Celilo Fiber System CX(s) Applied: B4.7 Date: 04/15/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

137

CX-010435: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

De Moss Substation Expansion CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

138

CX-010724: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Franklin Substation Upgrades CX(s) Applied: B4.11 Date: 08/19/2013 Location(s): Washington Offices(s): Bonneville Power Administration

139

CX-010338: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Eugene Substation Fiber Interconnection CX(s) Applied: B4.7 Date: 05/21/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

140

CX-010582: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Spring Creek Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

CX-010583: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Upper Jocko River Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration

142

CX-009513: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Aquatic Invasive Mussels Monitoring CX(s) Applied: B3.1 Date: 10/15/2012 Location(s): CX: none Offices(s): Bonneville Power Administration

143

CX-010581: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Little Shell Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration

144

CX-010586: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Umatilla Electric Cooperative CX(s) Applied: B4.9 Date: 07/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

145

CX-010730: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Paisley Geothermal Integration CX(s) Applied: B1.7 Date: 08/09/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

146

CX-010588: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Chehalis Substation Tree Clearing CX(s) Applied: B1.3 Date: 07/02/2013 Location(s): Washington Offices(s): Bonneville Power Administration

147

CX-010148: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Merritt Radio Station Upgrade CX(s) Applied: B1.19 Date: 04/18/2013 Location(s): Washington Offices(s): Bonneville Power Administration

148

CX-008684: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Metaline Radio Station Upgrade Project CX(s) Applied: B1.19 Date: 07/11/2012 Location(s): Washington Offices(s): Bonneville Power Administration

149

CX-008706: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Tunk Mountain Radio Station Upgrade CX(s) Applied: B1.19 Date: 05/30/2012 Location(s): Washington Offices(s): Bonneville Power Administration

150

CX-010437: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Rocky Ridge Radio Station Upgrade CX(s) Applied: B1.19 Date: 05/31/2013 Location(s): Montana Offices(s): Bonneville Power Administration

151

CX-010160: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Sundial Island Transmission Tower Relocation CX(s) Applied: B4.6 Date: 03/20/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

152

White Sturgeon Mitigation & Restoration in the Columbia & Snake River Upstream from Bonneville Dam  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

29, 2003 29, 2003 To: People Interested in the Project to Mitigate and Restore White Sturgeon Populations in the Columbia and Snake Rivers Bonneville Power Administration (BPA) has prepared the Final Environmental Assessment (EA), which includes a Finding of No Significant Impact (FONSI), for the White Sturgeon Mitigation and Restoration in the Columbia and Snake Rivers Upstream from Bonneville Dam Project. The document is enclosed for your information. Background: Since 1986, State, Federal, and Tribal fisheries agencies have been gathering data and studying habitats, movements, population dynamics, feeding, and distribution of white sturgeon in the Columbia River system. With the decline in anadromous salmonid runs there has been an increase in the importance of the white sturgeon fisheries. The Oregon Department of

153

Bonneville Project Act, Federal Columbia River Transmission System Act and Other Related Legislation.  

DOE Green Energy (OSTI)

Legislative texts are provided for: Bonneville Project Act which authorizes the completion, maintenance, and operation of Bonneville project for navigation, and for other purposes; Federal Columbia River Transmission system Act which enables the Secretary of the Interior to provide for operation, maintenance, and continued construction of the Federal transmission system in the Pacific Northwest by use of the revenues of the Federal Columbia River Power System and the proceeds of revenue bonds, and for other purposes; public law 88--552 which guarantees electric consumers of the Pacific Northwest first call on electric energy generated at Federal hydroelectric plants in that regions and reciprocal priority, and for other purposes; and public law 78--329 which provides for the partial construction of the Hungary Horse Dam on the South Fork of the Flathead River in the state of Montana, and for other purposes

Not Available

1985-01-01T23:59:59.000Z

154

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011  

Science Conference Proceedings (OSTI)

The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, J. R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

2012-03-01T23:59:59.000Z

155

Compliance Monitoring of Yearling Chinook Salmon and Juvenile Steelhead Survival and Passage at Bonneville Dam, Spring 2011  

Science Conference Proceedings (OSTI)

The study was designed to estimate dam passage survival at Bonneville Dam as stipulated by the 2008 Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) and to provide additional fish passage performance measures at that site as stipulated in the Columbia Basin Fish Accords.

Skalski, John R.; Townsend, Richard L.; Seaburg, Adam; Ploskey, Gene R.; Carlson, Thomas J.

2012-06-07T23:59:59.000Z

156

CX-008886: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

AT&T Fiber Addition North Bonneville-Ross No. 2 CX(s) Applied: B4.7 Date: 08/09/2012 Location(s): Washington Offices(s): Bonneville Power Administration

157

Lake-atmosphere feedbacks associated with paleolakes Bonneville and Lahontan  

SciTech Connect

A high-resolution, regional climate model nested within a general circulation model was used to study the interactions between the atmosphere and the large Pleistocene lakes in the Great Basin of the United States. Simulations for January and July 18,000 years ago indicate that moisture provided by synoptic-scale atmospheric circulation features was the primary component of the hydrologic budgets of Lakes Lahontan and Bonneville. In addition, lake-generated precipitation was a substantial component of the hydrologic budget of Lake Bonneville at that time. This local lake-atmosphere interaction may help explain differences in the relative size of these lakes 18,000 years ago.

Hostetler, S.W. (Geological Survey, Boulder, CO (United States)); Giorgi, F.; Bates, G.T. (National Center for Atmospheric Research, Boulder, CO (United States)); Bartlein, P.J. (Univ. of Oregon, Eugene, OR (United States))

1994-02-04T23:59:59.000Z

158

Bonneville Power Administration Fish & Wildlife Implementation Plan Final EIS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 SAMPLE IMPLEMENTATION ACTIONS, RESEARCH MONITORING AND EVALUATION, AND POLICY AND PLANNING Fish and Wildlife Implementation Plan EIS Volume 3: Sample Implementation Actions, Research Monitoring and Evaluation, and Policy and Planning Volume 3/ 1 VOLUME 3 SAMPLE IMPLEMENTATION ACTIONS, RESEARCH MONITORING AND EVALUATION, AND POLICY AND PLANNING One of the major challenges within the Region has been understanding the interrelationships among the numerous proposed fish and wildlife mitigation and recovery actions. One reason for this difficulty is that these actions are derived from many different regional proposals, each of which has been designed to meet a specific goal. In addition, the lack of an effective tool to illustrate these interrelationships has hampered understanding.

159

Bonneville Power Administration Nez Perce Tribal Hatchery Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

17 17 Federal Register / Vol. 62, No. 203 / Tuesday, October 21, 1997 / Notices all comments received within 60 days of the date of publication of this notice. FOR FURTHER INFORMATION CONTACT: To request more information on this proposed information collection or to obtain a copy of the proposal and associated collection instruments, please write the above address, or call Department of the Army Reports clearance officer at (703) 614-0454. Title: Research to Develop a Profile of Army National Guard Members. Needs and Uses: This research will be a mail survey among Army National Guard members. The research will assist the Army National Guard (ARNG) in making the most effective use of its public relations, advertising and marketing budget for recruiting efforts. The research will help the ARNG and its

160

Bonneville Power Administration/Lower Valley Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

853 853 Federal Register / Vol. 63, No. 162 / Friday, August 21, 1998 / Notices Radiological Impacts-Total radiological releases would be significantly lower than either the U.S. Environmental Protection Agency (EPA) limit or past annual releases from LANL. The resulting maximum concentrations for radionuclides measured at the location of the MEI for the demonstration is estimated to be less than two percent of the EPA limit. Radiological impacts associated with the proposed action could increase LANL total site impacts by a small percentage (1.0 percent for the MEI, 1.3 percent for the surrounding population, and 1.3 percent for the average individual). Under the proposed action, the estimated annual average dose to pit disassembly workers would be 750 mrem. The annual dose received by the

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

PRESSURIZATION TEST RESULTS: BONNEVILLE POWER ADMINISTRATION ENERGY CONSERVATION STUDY  

E-Print Network (OSTI)

retrofitted with a solar space heating system, with a forcedwith a roof-mounted solar water heating system. The plumbingwas retrofitted with solar space heating in addition to the

Krinkel, D.L.

2013-01-01T23:59:59.000Z

162

PRESSURIZATION TEST RESULTS: BONNEVILLE POWER ADMINISTRATION ENERGY CONSERVATION STUDY  

E-Print Network (OSTI)

solar space heating system seems to have introduced new leaks that perhaps counteract the effects of the storm

Krinkel, D.L.

2013-01-01T23:59:59.000Z

163

Bonneville Power Administration Notice of Availability of Record...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Volume Reduction Technology Study AGENCY: Department of Energy. ACTION: Notice of availability. SUMMARY: The Department of Energy has issued a study that reviews the technologies...

164

Audit of Bonneville Power Administration's Management of Information...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ombudsman FOIA Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work...

165

2011 Annual Planning Summary for Bonneville Power Administration...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Annual Planning Summary for National Nuclear Security Administration Service Center (NNSA-SC) Energy.gov Careers & Internships Guidance & Requirements Contact Us About This Site...

166

eGIS Portal PIA, Bonneville Power Administration | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory MOX Services Unclassified Information System PIA, National Nuclear Services Administration...

167

DOE/EIS-0285; Bonneville Power Administration Transmission System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning Steps and Mitigation Measures Site-specific Planning Steps will be a tool for ensuring that environmental aspects are considered as part of an integrated...

168

PRESSURIZATION TEST RESULTS: BONNEVILLE POWER ADMINISTRATION ENERGY CONSERVATION STUDY  

E-Print Network (OSTI)

either no retrofits or insulation only. Some reduction inin the houses fitted with insulation and storm doors andeither no retrofits or insulation only; an average reduction

Krinkel, D.L.

2013-01-01T23:59:59.000Z

169

DOE/EIS-0285; Bonneville Power Administration Transmission System...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Publications A-4 Scoping Feedback FYI A-5 A Public Involvement: Publications A-6 A-7 Scoping Feedback FYI A Public Involvement: Publications A-8 A-9 Scoping Feedback FYI...

170

Categorical Exclusion Determinations: Western Area PowerAdministratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region June 5, 2012 CX-008778: Categorical Exclusion Determination Combined Crew Vegetation Management on...

171

Bonneville County, Idaho: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Bonneville County, Idaho: Energy Resources Bonneville County, Idaho: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 43.4508683°, -111.5455289° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":43.4508683,"lon":-111.5455289,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

172

Hydroacoustic Evaluation of Fish Passage Through Bonneville Dam in 2002  

DOE Green Energy (OSTI)

The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) and the U.S. Army Engineer Research and Development Center (ERDC) conduct fish-passage studies at Bonneville Dam in 2002. The ERDC contracted with MEVATEC Corporation to provide staff ranging from scientists to technicians to help conduct the study. This study supports the Portland-District goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. In this report, we present results of two studies of juvenile salmonid passage at Bonneville Dam that we carried out in the 2002 downstream passage season April 20 through July 15, 2002. The first study of Project-wide FPE provides hourly estimates of fish passage and associated variances for all operating turbine units, spill bays, and the two sluiceway entrances at Powerhouse 1 (B1), as well as estimates of a variety of fish-passage efficiency and effectiveness measures. This was the third consecutive year of full-project hydroacoustic sampling and passage estimation. The second study was more narrowly focused on B2 turbines and had two components: (1) to sample the FGE at two modified turbine intakes and compare them with efficiencies of other B2 units that were sampled in the first study, and (2) to evaluate proportions of fish passing up into gatewell slots versus through screen gaps at a few B2 turbine intakes.

Ploskey, Gene R. (BATTELLE (PACIFIC NW LAB)); Schilt, Carl R. (MEVATEC); Kim, J (Lynntech); Escher, Charles (MEVATEC Corporation); Skalski, John R.

2003-08-15T23:59:59.000Z

173

Hydroacoustic Evaluation of Fish Passage through Bonneville Dam in 2004  

DOE Green Energy (OSTI)

The Portland District of the U.S. Army Corps of Engineers requested that the Pacific Northwest National Laboratory (PNNL) conduct fish-passage studies at Bonneville Dam in 2004. These studies support the Portland District's goal of maximizing fish-passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing Bonneville Dam. Major passage routes include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines and a sluiceway at Powerhouse 2 (B2). In this report, we present results of four studies related to juvenile salmonid passage at Bonneville Dam. The studies were conducted between April 15 and July 15, 2004, encompassing most of the spring and summer migrations. Studies included evaluations of (1) Project fish passage efficiency and other major passage metrics, (2) B2 fish guidance efficiency and gap loss, (3) smolt approach and fate at the B2 Corner Collector (B2CC), and (4) B2 vertical barrier screen head differential.

Ploskey, Gene R.; Weiland, Mark A.; Schilt, Carl R.; Kim, Jina; Johnson, Peter N.; Hanks, Michael E.; Patterson, Deborah S.; Skalski, John R.; Hedgepeth, J

2005-12-22T23:59:59.000Z

174

Evaluation of Salmon Spawning Below Bonneville Dam, 2005-2006 Annual Report.  

DOE Green Energy (OSTI)

Since FY 2000, scientists at Pacific Northwest National Laboratory (PNNL) have conducted research to assess the extent of spawning by chum salmon (Oncorhynchus keta) and fall Chinook salmon (O. tshawytscha) in the lower mainstem Columbia River. Their work supports a larger project funded by the Bonneville Power Administration (BPA) aimed at characterizing the physical habitat used by mainstem fall Chinook and chum salmon populations. Multiple collaborators in addition to PNNL are involved in the BPA project--counterparts include the Washington Department of Fish and Wildlife (WDFW), U.S. Fish and Wildlife Service (USFWS), Pacific States Marine Fisheries Commission (PSMFC), U.S. Geological Survey (USGS), and Oregon Department of Fish and Wildlife (ODFW). Data resulting from the individual tasks each agency conducts are providing a sound scientific basis for developing strategies to operate the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance the chum and tule fall Chinook salmon populations--both listed as threatened under the Endangered Species Act (ESA). Fall Chinook salmon, thought to originate from Bonneville Hatchery, were first noted to be spawning downstream of Bonneville Dam by WDFW biologists in 1993. Known spawning areas include gravel beds on the Washington side of the river near Hamilton Creek and near Ives Island. Limited surveys of spawning ground were conducted in the area around Ives and Pierce islands from 1994 through 1997. Based on those surveys, it is believed that fall Chinook salmon are spawning successfully in this area. The size of this population from 1994 to 1996 was estimated at 1800 to 5200 fish. Chum salmon also have been documented spawning downstream of Bonneville Dam. Chum salmon were listed as threatened under the ESA in March 1999. At present there is a need to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning areas, and the flows necessary to ensure their long-term survival. Ongoing discussions regarding the minimum and maximum flows will result in optimal spawning habitat usage and survival of embryos of both species. Collection of additional data as part of this project will ensure that established flow guidelines are appropriate and provide adequate protection for the species of concern. This is consistent with the high priority placed by the Northwest Power and Conservation Council Independent Scientific Advisory Board and the salmon managers on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin. Thus, there is a need to better understand the physical habitat variables used by mainstem fall Chinook and chum salmon populations and the effects of hydropower project operations on spawning and incubation. Pacific Northwest National Laboratory was asked to participate in the cooperative study during FY 2000. Since then, we have focused on (1) investigating the interactions between groundwater and surface water near fall Chinook and chum salmon spawning areas; (2) providing in-season hyporheic temperature data and assisting state agencies with emergence timing estimates; (3) locating and mapping deep-water fall Chinook salmon spawning areas; and (4) providing support to the WDFW for analysis of stranding data. Work conducted during FY 2006 addressed these same efforts. This report documents the studies and tasks performed by PNNL during FY 2006. Chapter 1 provides a description of the searches conducted for deepwater redds--adjacent to Pierce and Ives islands for fall Chinook salmon and near the Interstate 205 bridge for chum salmon. The chapter also provides data on redd location, information about habitat associations, and estimates of total spawning populations. Chapter 2 documents the collection of data on riverbed and river temperatures and water surface elevations, from the onset of spawning to the end of emergence, and the provision of those data in-season to fisheries management agencies to assist with emer

Arntzen, Evan; Mueller, Robert; Murray, Christopher [Pacific Northwest National Laboratory

2007-03-01T23:59:59.000Z

175

Evaluation of Salmon Spawning Below Bonneville Dam, Annual Report October 2005 - September 2006.  

DOE Green Energy (OSTI)

Since FY 2000, scientists at Pacific Northwest National Laboratory (PNNL) have conducted research to assess the extent of spawning by chum salmon (Oncorhynchus keta) and fall Chinook salmon (O. tshawytscha) in the lower mainstem Columbia River. Their work supports a larger project funded by the Bonneville Power Administration (BPA) aimed at characterizing the physical habitat used by mainstem fall Chinook and chum salmon populations. Multiple collaborators in addition to PNNL are involved in the BPA project--counterparts include the Washington Department of Fish and Wildlife (WDFW), U.S. Fish and Wildlife Service (USFWS), Pacific States Marine Fisheries Commission (PSMFC), U.S. Geological Survey (USGS), and Oregon Department of Fish and Wildlife (ODFW). Data resulting from the individual tasks each agency conducts are providing a sound scientific basis for developing strategies to operate the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance the chum and tule fall Chinook salmon populations--both listed as threatened under the Endangered Species Act (ESA). Fall Chinook salmon, thought to originate from Bonneville Hatchery, were first noted to be spawning downstream of Bonneville Dam by WDFW biologists in 1993. Known spawning areas include gravel beds on the Washington side of the river near Hamilton Creek and near Ives Island. Limited surveys of spawning ground were conducted in the area around Ives and Pierce islands from 1994 through 1997. Based on those surveys, it is believed that fall Chinook salmon are spawning successfully in this area. The size of this population from 1994 to 1996 was estimated at 1800 to 5200 fish. Chum salmon also have been documented spawning downstream of Bonneville Dam. Chum salmon were listed as threatened under the ESA in March 1999. At present there is a need to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning areas, and the flows necessary to ensure their long-term survival. Ongoing discussions regarding the minimum and maximum flows will result in optimal spawning habitat usage and survival of embryos of both species. Collection of additional data as part of this project will ensure that established flow guidelines are appropriate and provide adequate protection for the species of concern. This is consistent with the high priority placed by the Northwest Power and Conservation Council Independent Scientific Advisory Board and the salmon managers on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin. Thus, there is a need to better understand the physical habitat variables used by mainstem fall Chinook and chum salmon populations and the effects of hydropower project operations on spawning and incubation. Pacific Northwest National Laboratory was asked to participate in the cooperative study during FY 2000. Since then, we have focused on (1) investigating the interactions between groundwater and surface water near fall Chinook and chum salmon spawning areas; (2) providing in-season hyporheic temperature data and assisting state agencies with emergence timing estimates; (3) locating and mapping deep-water fall Chinook salmon spawning areas; and (4) providing support to the WDFW for analysis of stranding data. Work conducted during FY 2006 addressed these same efforts. This report documents the studies and tasks performed by PNNL during FY 2006. Chapter 1 provides a description of the searches conducted for deepwater redds--adjacent to Pierce and Ives islands for fall Chinook salmon and near the Interstate 205 bridge for chum salmon. The chapter also provides data on redd location, information about habitat associations, and estimates of total spawning populations. Chapter 2 documents the collection of data on riverbed and river temperatures and water surface elevations, from the onset of spawning to the end of emergence, and the provision of those data in-season to fisheries management agencies to assist with emer

Arntzen, Evan V.; Mueller, Robert P.; Murray, Christopher J. [Pacific Northwest National Laboratory

2007-09-21T23:59:59.000Z

176

Electricity savings among participants three years after weatherization in Bonneville's 1986 residential weatherization program  

SciTech Connect

To ensure proper assessment of its weatherization activities, the Bonneville Power Administration (Bonneville) has examined several cohorts of participants in various phases of its Long-Term Residential Weatherization Program (Long-Term RWP). Beginning in 1980, energy savings one, two, and three years after program participation have been evaluated. This study, which continues the series of Bonneville's ongoing evaluation of weatherization activities, examines electricity savings three years after weatherization in the 1986 Long-Term RWP. Electricity bills were weather-adjusted using the Princeton Scorekeeping Method (PRISM). Normalized Annual Consumption (NAC) was calculated for each participant and control household for which data were available. Gross energy savings were calculated by subtracting a household's NAC for each postretrofit year (1986--87, 1986--88, and 1988--89) from its preretrofit NAC (1985--86). Household level data were aggregated and examined at the utility level allowing the calculation of average net savings, which is the difference between gross savings by nonparticipants and participants. Utility-level data were then weighted, based on the extent of each utility's participation in the Long-Term RWP in 1986, to allow the identification of overall program savings. 29 refs., 5 figs., 14 tabs.

White, D.L.; Brown, M.A.

1990-09-01T23:59:59.000Z

177

Evaluation of Salmon Spawning Below Bonneville Dam Annual Report October 2006 - September 2007.  

DOE Green Energy (OSTI)

From 1999 through 2007, the Fish and Wildlife Program of the Bonneville Power Administration funded a project to determine the number of fall Chinook and chum salmon spawning downstream of Bonneville Dam, the characteristics of their spawning areas, and the flows necessary to ensure their long-term survival. Data were collected to ensure that established flow guidelines are appropriate and provide adequate protection for the species of concern. The projects objectives are consistent with the high priority placed by the Northwest Power and Conservation Council Independent Scientific Advisory Board and the salmon managers on determining the importance of mainstem habitats to the production of salmon in the Columbia River Basin. Because of the influence of mainstem habitat on salmon production, there is a continued need to better understand the physical habitat variables used by mainstem fall Chinook and chum salmon populations and the effects of hydropower project operations on spawning and incubation. During FY 2007, Pacific Northwest National Laboratory focused on (1) locating and mapping deep-water fall Chinook salmon and chum salmon spawning areas, (2) investigating the interaction between groundwater and surface water near fall Chinook and chum salmon spawning areas, and (3) providing in-season hyporheic temperature and water surface elevation data to assist state agencies with emergence timing and redd dewatering estimates. This report documents the studies and tasks performed by PNNL during FY 2007. Chapter 1 provides a description of the searches conducted for deepwater redds-adjacent to Pierce and Ives islands for fall Chinook salmon and near the Interstate 205 bridge for chum salmon. The chapter also provides data on redd location, information about habitat associations, and estimates of total spawning populations. Chapter 2 documents the collection of data on riverbed and river temperatures and water surface elevations, from the onset of spawning to the end of emergence, and the provision of those data in-season to fisheries management agencies to assist with emergence timing estimates and evaluations of redd dewatering.

Arntzen, Evan V.; Mueller, Robert P.; Murray, Katherine J.; Bott, Yi-Ju [Pacific Northwest National Laboratory

2008-08-08T23:59:59.000Z

178

Above Bonneville Passage and Propagation Cost Effectiveness Analysis.  

DOE Green Energy (OSTI)

We have developed several models to evaluate the cost-effectiveness of alternative strategies to mitigate hydrosystem impacts on salmon and steelhead, and applied these models to areas of the Columbia River Basin. Our latest application evaluates the cost-effectiveness of proposed strategies that target mainstem survival (e.g., predator control, increases in water velocity) and subbasin propagation (e.g., habitat improvements, screening, hatchery production increases) for chinook salmon and steelhead stocks, in the portion of the Columbia Basin bounded by Bonneville, Chief Joseph, Dworshak, and Hells Canyon darns. At its core the analysis primarily considers financial cost and biological effectiveness, but we have included other attributes which may be of concern to the region.

Paulsen, C.M.; Hyman, J.B.; Wernstedt, K.

1993-05-01T23:59:59.000Z

179

CX-008696: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration

180

Bonneville Power Administration Notice of Availability of Record of Decision for the Bonneville Power Administration/Puget Power Northwest Washington Transmission Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

74 74 Federal Register / Vol. 60, No. 197 / Thursday, October 12, 1995 / Notices to speak to the Committee, on a first come, first serve basis. Those who call in and reserve time will be given the opportunity to speak first. The Chairman is empowered to conduct the meeting in a fashion that will facilitate the orderly conduct of business. Transcripts and Minutes: Meeting minutes will be available for public review and copying at the Freedom of Information Public Reading Room, 1E-190, Forrestal Building, 1000 Independence Avenue, S.W., Washington, DC 20585 between 9:00 a.m. and 4:00 p.m., Monday through Friday, except Federal holidays. Issued at Washington, DC on October 5, 1995. Rachel M. Samuel, Acting Deputy Advisory Committee Management Officer. [FR Doc. 95-25215 Filed 10-11-95; 8:45 am]

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville, The Dalles, John Day and McNary Dams; 1999-2000 Annual Report.  

DOE Green Energy (OSTI)

This report describes work conducted by the Oregon Department of Fish and Wildlife (ODFW) and the Washington Department of Fish and Wildlife (WDFW) from 1 October 1999 to 30 September 2000. The work is part of studies to evaluate spawning of fall chinook salmon (Oncorhynchus tshawytscha) and chum salmon (O. keta) below the four lowermost Columbia River dams under the Bonneville Power Administration's Project 99-003. The purpose of this project is twofold: (1) Document the existence of fall chinook and chum populations spawning below Bonneville Dam (river mile (RM) 145), The Dalles Dam (RM 192), John Day Dam (RM 216), and McNary Dam (RM 292) (Figure 1) and estimate the size of these populations; and (2) Profile stocks for important population characteristics; including spawning time, genetic make-up, emergence timing, migration size and timing, and juvenile to adult survival rates.

van der Naald, Wayne; Spellman, Bryant; Clark, Roy (Oregon Department of Fish and Wildlife, Portland, OR)

2001-10-01T23:59:59.000Z

182

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010  

SciTech Connect

The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

2011-02-01T23:59:59.000Z

183

Monitoring of Juvenile Yearling Chinook Salmon and Steelhead Survival and Passage at Bonneville Dam, Spring 2010  

Science Conference Proceedings (OSTI)

The purpose of this study was to estimate the survival for yearling Chinook salmon and steelhead smolts during spring 2010 in a portion of the Columbia River that includes Bonneville Dam. The study estimated smolt survival from a virtual release at Bonneville Dam to a survival array 81 km downstream of Bonneville Dam. We also estimated median forebay residence time, median tailrace egress time, and spill passage efficiency (SPE), as required in the Columbia Basin Fish Accords. A single release design was used to estimate survival from Bonneville Dam to a primary array located 81 km downstream of Bonneville. The approach did not include a reference tailrace release. Releases of acoustic-tagged smolts above John Day Dam to Hood River contributed to the formation of virtual releases at a Bonneville Dam forebay entrance array and at the face of the dam. A total of 3,880 yearling Chinook salmon and 3,885 steelhead smolts were tagged and released in the investigation. The Juvenile Salmon Acoustic Telemetry System (JSATS) tag model number ATS-156dB, weighing 0.438 g in air, was used in this investigation.

Ploskey, Gene R.; Faber, Derrek M.; Weiland, Mark A.; Carlson, Thomas J.

2012-09-01T23:59:59.000Z

184

(DOE/EIS-0285/SA-112): Supplement Analysis for the Transmission System Vegetation Management Program FEIS -Ross-Alcoa 1&2, 3&4 and Bonneville-Alcoa 1&2) 10/15/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October October 15, 2002 REPLY TO ATTN OF: KEP/Z-992 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS (DOE/EIS-0285/SA-112-Ross-Alcoa 1&2, 3&4 and Bonneville Alcoa 1&2. Ed Tompkins - TFO/Ross Proposed Action: Vegetation Management for portions of the Ross-Alcoa transmission lines 230kV & 115kV and Bonneville-Alcoa 115kV. Proposed by: Bonneville Power Administration (BPA). Location: Project location is within Clark County, Washington and is within the Olympia Region. Description of the Proposal: BPA proposes to clear targeted vegetation within the Right-of-Ways along access roads and around tower structures that may impede the operation and maintenance of the subject transmission lines. See Section 1.4 of the attached checklists for a complete description of the proposed action. Analysis: See the attached checklists

185

Section 5.7.3 Power Factor Correction: Greening Federal Facilities...  

NLE Websites -- All DOE Office Websites (Extended Search)

through a capacitor has the effect of cancelling out the lagging current. References Energy-Efficient Motor Selection Handbook (DE-B179- 93-B08158), Bonneville Power...

186

CX-009697: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Tualatin Valley Water District Waterline Land Use Review Request CX(s) Applied: B4.9 Date: 12/31/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

187

CX-008885: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Raver Substation-Control House Expansion & Seismic Retrofit CX(s) Applied: B4.11 Date: 08/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration

188

CX-008682: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

South Tacoma-Frederickson Fiber Project (Update) CX(s) Applied: B4.7 Date: 07/13/2012 Location(s): Washington Offices(s): Bonneville Power Administration

189

CX-008686: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Disposition of Mountain Avenue Substation and Tap Line CX(s) Applied: B1.24 Date: 07/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

190

CX-007990: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Pearl Substation 500-Kilovolt #6 Bay Addition CX(s) Applied: B4.6 Date: 02/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

191

CX-009706: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Keeler Substation-Control House Expansion CX(s) Applied: B4.11 Date: 12/04/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

192

CX-010430: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale CX(s) Applied: B1.24 Date: 06/20/2013 Location(s): Washington Offices(s): Bonneville Power Administration

193

CX-010432: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

De-energized Wood Pole Removal Project CX(s) Applied: B4.10 Date: 06/05/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

194

CX-010149: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Integration of the Port of Tillamook Bay Generating Facility CX(s) Applied: B1.7 Date: 04/15/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

195

CX-010580: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

McNary Substation Shunt Capacitor Addition CX(s) Applied: B4.6 Date: 07/17/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

196

CX-007986: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Pearl-Marion #1 Tower 6/2 Replacement Project CX(s) Applied: B4.6 Date: 02/23/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

197

CX-008879: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Pearl-Marion No.1 Line Tower 21/1 Bank Repair Project CX(s) Applied: B1.3 Date: 08/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

198

CX-008878: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Driscoll-Naselle No. 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 08/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration

199

CX-009787: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Rogue-Gold Beach No. 2 Disconnect Switch Replacement CX(s) Applied: B4.6 Date: 01/08/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

200

CX-010162: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Revenue Meter Replacement at Oregon Trail Electric Co-ops (OTEC's) West John Day Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

CX-010738: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration

202

CX-010592: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Big Eddy-Redmond Conductor Maintenance CX(s) Applied: B1.3 Date: 06/24/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

203

CX-010594: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Monroe-Snohomish Expanded Conductor Replacement CX(s) Applied: B4.6 Date: 06/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration

204

CX-010584: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Kokanee Bend South Conservation Easement Funding CX(s) Applied: B1.25 Date: 07/10/2013 Location(s): Montana Offices(s): Bonneville Power Administration

205

CX-008694: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Acquisition and Disposition of Property CX(s) Applied: B1.24 Date: 06/20/2012 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration

206

CX-010434: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

LaPine Substation Shunt Reactor Addition CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

207

CX-008687: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Bandon-Rogue Transmission Line Rebuild Project - Fiscal Year 2012 Culvert Replacement and Associated Access Road Reconstruction CX(s) Applied: B1.3 Date: 07/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

208

CX-008163: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Portland General Electric 13-Kilovolt Overhead Electrical Line Land Use Review Request CX(s) Applied: B4.9 Date: 03/28/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

209

CX-010421: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Bell-Boundary Fiber Project CX(s) Applied: B4.7 Date: 06/11/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

210

CX-010577: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Peninsula Light Company Line and Load Interconnection Request L0308 (Amendment) CX(s) Applied: B4.12 Date: 07/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration

211

CX-010720: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Monroe-Custer #2 Access Roads CX(s) Applied: B1.3 Date: 08/26/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

212

CX-010725: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

2013 Ross Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 08/19/2013 Location(s): Washington, Washington, Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

213

CX-010729: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

2013 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 08/12/2013 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

214

CX-010722: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Soos Creek Water & Sewer District Land Use Review Request Case No. 20120040 CX(s) Applied: B4.9 Date: 08/20/2013 Location(s): Washington Offices(s): Bonneville Power Administration

215

CX-010731: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Chief Joseph-Snohomish Rockfall Barrier Fence Construction CX(s) Applied: B1.11 Date: 08/05/2013 Location(s): Washington Offices(s): Bonneville Power Administration

216

CX-010719: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Grande Ronde-Boyer Ground Impairments CX(s) Applied: B1.3 Date: 08/26/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

217

CX-010146: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Bald Mountain, Miller Peak, Lines Creek, and Taft Passive Repeater Communication Upgrades CX(s) Applied: B1.19 Date: 04/24/2013 Location(s): Montana, Montana, Idaho Offices(s): Bonneville Power Administration

218

CX-009785: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Roosevelt Radio Station Emergency Generator Removal and Replacement CX(s) Applied: B1.3 Date: 01/07/2013 Location(s): Washington Offices(s): Bonneville Power Administration

219

CX-010585: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Teakean Butte Radio Station Upgrade CX(s) Applied: B1.19, B1.24 Date: 07/03/2013 Location(s): Idaho Offices(s): Bonneville Power Administration

220

CX-010154: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Digital Communication System Upgrade Project: D Analog System Retirement and #WC SONET Ring CX(s) Applied: B1.19 Date: 04/05/2013 Location(s): Washington Offices(s): Bonneville Power Administration

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

CX-008721: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

City of Longview Pump Stations and Force Main Project CX(s) Applied: B4.9 Date: 05/15/2012 Location(s): Washington Offices(s): Bonneville Power Administration

222

CX-008169: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Integration of the Echo Point Community Wind Generation Project CX(s) Applied: B1.7 Date: 03/20/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

223

CX-010347: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Franklin-Badger Canyon #2 & Walla Walla-Pendleton #1 Wood Poles CX(s) Applied: B1.3 Date: 04/30/2013 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration

224

CX-010424: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Grand Coulee District Wood Replacement CX(s) Applied: B1.3 Date: 06/07/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

225

CX-010345: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

North Bend District Wood Poles CX(s) Applied: B1.3 Date: 05/09/2013 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

226

CX-010166: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Wenatchee District Wood Pole Replacements CX(s) Applied: B1.3 Date: 03/22/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

227

CX-010344: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Alvey District Wood Poles CX(s) Applied: B1.3 Date: 05/09/2013 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration

228

CX-010151: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Brasada-Harney No. 1 Wood Pole Replacement Project CX(s) Applied: B1.3 Date: 04/12/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

229

CX-007994: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Upgrade of the Existing Septic System at the Redmond Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

230

CX-007995: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Upgrade of the Existing Septic System at the Big Eddy Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/07/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

231

CX-010423: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Underwood Tap Structure Replacement and Access Road CX(s) Applied: B4.6 Date: 06/07/2013 Location(s): Washington Offices(s): Bonneville Power Administration

232

CX-008690: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Lancaster Line and Load Project CX(s) Applied: B4.6, B4.7 Date: 06/28/2012 Location(s): Idaho Offices(s): Bonneville Power Administration

233

CX-009200: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Respond to the Town of Eatonvilles Land Use Review Request (LURR) CX(s) Applied: B4.7 Date: 09/19/2012 Location(s): Washington Offices(s): Bonneville Power Administration

234

CX-008704: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Grand Coulee-Bell No. 3 Double Circuit 230 Kilovolt Transmission Line Reconductoring Project CX(s) Applied: B1.3 Date: 05/31/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration

235

CX-010429: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Harbour Pointe Small Generator Integration CX(s) Applied: B1.7 Date: 06/25/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

236

The Bonneville Flood Debris Field as Sacred Landscape  

E-Print Network (OSTI)

Area for the CJ Strike Hydroelectric Plant, Idaho PowerWithin the Proposed Dike Hydroelectric Project Impact Area.

Pavesic, Max G

2007-01-01T23:59:59.000Z

237

Categorical Exclusion Determinations: Western Area PowerAdministratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CX(s) Applied: B4.6 Date: 12132012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region December 11, 2012 CX-009532: Categorical...

238

Categorical Exclusion Determinations: Western Area PowerAdministratio...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

B1.16, B1.19, B1.23 Date: 10172011 Location(s): California Offices(s): Western Area Power Administration-Desert Southwest Region October 13, 2011 CX-007801: Categorical...

239

Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2003-2004 Annual Report.  

DOE Green Energy (OSTI)

In 2003 a total of 253 adult fall chinook and 113 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 221 fall chinook and 109 chum samples. The peak redd count for fall chinook was 190. The peak redd count for chum was 262. Peak spawning time for fall chinook was set at approximately 24 November. Peak spawning time for chum occurred approximately 24 November. There were estimated to be a total of 1,533 fall chinook spawning below Bonneville Dam in 2003. The study area's 2003 chum population was estimated to be 688 spawning fish. Temperature unit data suggests that below Bonneville Dam 2003 brood bright stock, fall chinook emergence began on January 6, 2004 and ended 28 April 2004, with peak emergence occurring 13 April. 2003 brood juvenile chum emergence below Bonneville Dam began 22 February and continued through 15 April 2004. Peak chum emergence took place 25 March. A total of 25,433 juvenile chinook and 4,864 juvenile chum were sampled between the dates of 20 January and 28 June 2004 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2004 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2003 all of the fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock. Observed spawning times, adult age and sex composition, GSI and DNA analysis, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration suggests chum spawning and rearing below Bonneville dam are similar to stocks of chum found in Hamilton and Hardy creek and are part of the Lower Columbia River Chum ESU.

van der Naald, Wayne; Duff, Cameron; Brooks, Robert (Oregon Department of Fish and Wildlife, Columbia River Section, John Day, OR)

2005-01-01T23:59:59.000Z

240

Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2002-2003 Annual Report.  

DOE Green Energy (OSTI)

In 2002 a total of 364 adult fall chinook and 472 chum were sampled for biological data in the Ives and Pierce islands area below Bonneville Dam. Vital statistics were developed from 290 fall chinook and 403 chum samples. The peak redd count for fall chinook was 214. The peak redd count for chum was 776. Peak spawning time for fall chinook was set at approximately 15 November. Peak spawning time for chum occurred approximately 6 December. There were estimated to be a total of 1,881 fall chinook spawning below Bonneville Dam in 2002. The study area's 2002 chum population was estimated to be 4,232 spawning fish. Temperature unit data suggests that below Bonneville Dam 2002 brood bright stock, fall chinook emergence began on February 3 2003 and ended 7 May 2003, with peak emergence occurring 20 April. 2002 brood juvenile chum emergence below Bonneville Dam began 27 January and continued through 6 April 2003. Peak chum emergence took place 1 March. A total of 10,925 juvenile chinook and 1,577 juvenile chum were sampled between the dates of 24 January and 21 July 2003 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place during the month of June 2003 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2002 and 2003 the majority of fall chinook using the area below Bonneville Dam were of a late-spawning, bright stock of fall chinook. Observed spawning times, adult age and sex composition, GSI and DNA analysis, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration suggests chum spawning and rearing below Bonneville dam are similar to stocks of chum found in Hamilton and Hardy creek and are part of the Lower Columbia River Chum ESU.

van der Naald, Wayne; Clark, Roy; Brooks, Robert (Oregon Department of Fish and Wildlife, Columbia River Section, John Day, OR)

2004-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

CX-009196: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

Proposed Sale of Bonneville Power Administration (BPA) Fee Owned Property to Washington State Department of Transportation (WSDOT) for Interstate On and Off Ramps CX(s) Applied: B1.24 Date: 10/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration

242

Quantifying the Behavioral Response of Spawning Chum Salmon to Elevated Discharges from Bonneville Dam, Columbia River : Annual Report 2005-2006.  

DOE Green Energy (OSTI)

In unimpounded rivers, Pacific salmon (Oncorhynchus spp.) typically spawn under relatively stable stream flows, with exceptions occurring during periodic precipitation events. In contrast, hydroelectric development has often resulted in an artificial hydrograph characterized by rapid changes in discharge and tailwater elevation that occur on a daily, or even an hourly basis, due to power generation (Cushman 1985; Moog 1993). Consequently, populations of Pacific salmon that are known to spawn in main-stem habitats below hydroelectric dams face the risks of changing habitat suitability, potential redd dewatering, and uncertain spawning success (Hamilton and Buell 1976; Chapman et al. 1986; Dauble et al. 1999; Garland et al. 2003; Connor and Pflug 2004; McMichael et al. 2005). Although the direct effects of a variable hydrograph, such as redd dewatering are apparent, specific effects on spawning behavior remain largely unexplored. Chum salmon (O. keta) that spawn below Bonneville Dam on the Columbia River are particularly vulnerable to the effects of water level fluctuations. Although chum salmon generally spawn in smaller tributaries (Johnson et al. 1997), many fish spawn in main-stem habitats below Bonneville Dam near Ives Island (Tomaro et al. 2007; Figure 1). The primary spawning area near Ives Island is shallow and sensitive to changes in water level caused by hydroelectric power generation at Bonneville Dam. In the past, fluctuating water levels have dewatered redds and changed the amount of available spawning habitat (Garland et al. 2003). To minimize these effects, fishery managers attempt to maintain a stable tailwater elevation at Bonneville Dam of 3.5 m (above mean sea level) during spawning, which ensures adequate water is provided to the primary chum salmon spawning area below the mouth of Hamilton Creek (Figure 1). Given the uncertainty of winter precipitation and water supply, this strategy has been effective at restricting spawning to a specific riverbed elevation and providing minimum spawning flows that have the greatest chance of being maintained through egg incubation and fry emergence. However, managing the lower Columbia River for a stable tailwater elevation does not provide much operational flexibility at Bonneville Dam, which has little storage capacity. When river discharges increase due to rain events, the traditional approach has been to pass excess water at night to maintain stable tailwater elevations during the daytime. The underlying assumption of this strategy, referred to as reverse load following, is that fish do not spawn at night. However, Tiffan et al. (2005) showed that this assumption is false by documenting nighttime spawning by chum salmon in the Ives Island area. Similarly, McMichael et al. (2005) reported nighttime spawning by Chinook salmon (O. tshawytscha) in the Columbia River, indicating that diel spawning may be a common occurrence in Pacific salmon. During the latter portion of the chum spawning period in December 2003 and 2004, discharges from Bonneville Dam increased from an average of 3,398 m3/s (tailwater elevation {approx} 3.5 m above mean sea level) during the day to over 5,664 m3/s (tailwater elevation {approx} 5.1 m) at night, with peak discharges of 7,080 m{sup 3}/s (tailwater elevation {approx} 6.1 m). This caused concern among fishery managers regarding the potential effects of these high discharges on this population of spawning chum salmon, which is listed under the Endangered Species Act (National Oceanic and Atmospheric Administration 1999). We hypothesized that increased water velocities associated with elevated tailwaters might alter chum salmon spawning behavior if water velocities at redd locations increased beyond the range of suitability (>0.8 m/s; Salo 1991). In 2005, we investigated the movement and behavioral responses of spawning chum salmon at Ives Island to increased tailwater elevations at Bonneville Dam. We used acoustic telemetry to determine if the higher velocities associated with increased tailwater elevations caused fish to leave their re

Tiffan, Kenneth F.; Haskell, Craig A.; Kock, Tobias J.

2008-12-01T23:59:59.000Z

243

Evaluation of a Behavioral Guidance Structure at Bonneville Dam Second Powerhouse including Passage Survival of Juvenile Salmon and Steelhead using Acoustic Telemetry, 2008  

DOE Green Energy (OSTI)

Summarizes research conducted at Bonneville Dam in 2008 to evaluate a prototype Behavioral Guidance Structure, that was deployed by the US Army Corps of Engineers in an effort to increase survival of outmigrating smolts at Bonneville Dam.

Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; McComas, Roy L.; Kim, Jina; Townsend, R. L.; Fu, Tao; Skalski, J. R.; Fischer, Eric S.

2010-02-12T23:59:59.000Z

244

Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 1, Environmental Analysis.  

DOE Green Energy (OSTI)

This is volume 1 of the final environmental impact statement of the Bonneville Power Administration Information is included on the following: Purpose of and need for action; alternatives including the proposed action; affected environment; and environmental consequences.

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

245

Influence of river level on temperature and hydraulic gradients in chum and fall Chinook salmon spawning areas downstream of Bonneville Dam, Columbia River  

SciTech Connect

Chum (Oncorhynchus keta) and fall Chinook (O. tshawytscha) salmon segregate spatially during spawning in the Ives Island side channel of the lower Columbia River downstream from Bonneville Dam. Previous research during one spawning season (2000) suggested that these species selected spawning habitats based on differences in hyporheic temperature and vertical hydraulic gradient (VHG) with the river. In this study, we confirmed the spatial segregation of spawning based on hyporheic characteristics over four years (20012004) and examined the effects of load-following operations (power generation to meet short-term electrical demand) at Bonneville Dam on hyporheic function and characteristics. We found that during the study period, hyporheic temperature and VHG in chum salmon spawning areas were highly variable during periods of load-following operation when river levels fluctuated. In contrast, hyporheic water temperature and VHG within chum spawning areas fluctuated less when river levels were not changing due to load-following operation. Variable temperature and VHG could affect chum and fall Chinook salmon spawning segregation and incubation success by altering the cues each species uses to select redd sites. Alterations in site selection would result in a breakdown in the spatial segregation of spawning between chum and fall Chinook salmon, which would expose earlier spawning fall Chinook eggs to a greater risk of dislodgement from later spawning chum salmon. Additional research will be required to fully assess the effects of load-following operations on the hyporheic environment and spawning and incubation success of chum and fall Chinook salmon downstream from Bonneville Dam.

Geist, David R.; Arntzen, Evan V.; Murray, Christopher J.; McGrath, Kathy; Bott, Yi-Ju; Hanrahan, Timothy P.

2008-02-01T23:59:59.000Z

246

Categorical Exclusion Determinations: Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

September 14, 2012 September 14, 2012 CX-009204: Categorical Exclusion Determination Bonneville-Hood River Number 1 Danger Pole Replacement and Access Road Upgrades CX(s) Applied: B1.3 Date: 09/14/2012 Location(s): Oregon Offices(s): Bonneville Power Administration September 14, 2012 CX-009201: Categorical Exclusion Determination Short-term Additional Amendments to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 09/14/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration September 12, 2012 CX-009206: Categorical Exclusion Determination Chahalpam Property Funding CX(s) Applied: B1.25 Date: 09/12/2012 Location(s): Oregon Offices(s): Bonneville Power Administration September 12, 2012 CX-009205: Categorical Exclusion Determination Rice Flats Electrode Site Maintenance and Inspection Project

247

Bonneville Seabase Scuba Dive Pool Pool & Spa Low Temperature Geothermal  

Open Energy Info (EERE)

Seabase Scuba Dive Pool Pool & Spa Low Temperature Geothermal Seabase Scuba Dive Pool Pool & Spa Low Temperature Geothermal Facility Jump to: navigation, search Name Bonneville Seabase Scuba Dive Pool Pool & Spa Low Temperature Geothermal Facility Facility Bonneville Seabase Scuba Dive Pool Sector Geothermal energy Type Pool and Spa Location Grantsville, Utah Coordinates 40.5999425°, -112.4643988° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

248

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 29, 2012 March 29, 2012 CX-008407: Categorical Exclusion Determination Terry Ranch Road Substation CX(s) Applied: B1.24, B4.11 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region March 29, 2012 CX-008403: Categorical Exclusion Determination Multiple Structure Replacement Flaming Gorge to Vernal No. 1 138 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region March 29, 2012 CX-008399: Categorical Exclusion Determination Erosion Control Measures Structure No. 110-3 Dave Johnston to Stegall 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

249

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 1, 2013 April 1, 2013 CX-010106: Categorical Exclusion Determination Flaming Gorge Microwave Site Communications Building Access Road Repairs CX(s) Applied: B1.3 Date: 04/01/2013 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region March 26, 2013 CX-010105: Categorical Exclusion Determination Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 03/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region January 23, 2013 CX-009804: Categorical Exclusion Determination Kersey West Switching Station Interconnection Kiowa Creek - Welc 115 Kilovolt Transmission Line CX(s) Applied: B4.1, B4.11 Date: 01/23/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

250

Categorical Exclusion Determinations: Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 5, 2013 June 5, 2013 CX-010432: Categorical Exclusion Determination De-energized Wood Pole Removal Project CX(s) Applied: B4.10 Date: 06/05/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration June 4, 2013 CX-010521: Categorical Exclusion Determination Recovery Act: Rural Electric Cooperative Geothermal Development CX(s) Applied: B4.12, B5.15 Date: 06/04/2013 Location(s): Oregon Offices(s): Golden Field Office June 4, 2013 CX-010433: Categorical Exclusion Determination Memaloose Meadows Land Acquisition CX(s) Applied: B1.25 Date: 06/04/2013 Location(s): Oregon Offices(s): Bonneville Power Administration June 3, 2013 CX-010435: Categorical Exclusion Determination De Moss Substation Expansion CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

251

Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville, The Dalles, John Day, and McNary Dams; 2000-2001 Annual Report.  

DOE Green Energy (OSTI)

This report describes work conducted by the Oregon Department of Fish and Wildlife (ODFW) and the Washington Department of Fish and Wildlife (WDFW) from 1 October 2000 to 30 September 2001. The work is part of studies to evaluate spawning of fall chinook salmon (Oncorhynchus tshawytscha) and chum salmon (O. keta) below the four lowermost Columbia River dams under the Bonneville Power Administration's Project 99-003. The purpose of this project is twofold: (1) Document the existence of fall chinook and chum populations spawning below Bonneville Dam (river mile (RM) 145), The Dalles Dam (RM 192), John Day Dam (RM 216), and McNary Dam (RM 292) (Figure 1) and estimate the size of these populations. (2) Profile stocks for important population characteristics; including spawning time, genetic make-up, emergence timing, migration size and timing, and juvenile to adult survival rates. Specific tasks conducted by ODFW and WDFW during this period were: (1) Documentation of fall chinook and chum spawning below Bonneville, The Dalles, John Day and McNary dams using on-water observations; (2) Collection of biological data to profile stocks in areas described in Task 1; (3) Determination of spawning population estimates and age composition, average size at return, and sex ratios in order to profile stocks in areas described in Task 1; (4) Collection of data to determine stock origin of adult salmon found in areas described in Task 1; (5) Determination of possible stock origins of adult salmon found in areas described in Task 1 using tag rates based on coded-wire tag recoveries and genetic baseline analysis; (6) Determination of emergence timing and hatching rate of juvenile fall chinook and chum below Bonneville Dam; (7) Determination of migration time and size for juvenile fall chinook and chum rearing in the area described in Task 6; (8) Investigation of feasibility of determining stock composition of juvenile fall chinook and chum rearing in the area described in Task 6; (9) Documentation of entrapment in low-lying areas of juvenile fall chinook and chum rearing in the area described in Task 6; and (10) Investigation of feasibility of determining juvenile to adult survival rate from coded-wire tagged juvenile fall chinook captured and tagged in the area described in Task 6.

van der Naald, Wayne; Clark, Roy; Spellman, Bryant (Oregon Department of Fish and Wildlife, Portland, OR)

2002-09-17T23:59:59.000Z

252

Evaluation of Fall Chinook and Chum Salmon below Bonneville, The Dalles, John Day and McNary Dams; 1998-1999 Annual Report.  

DOE Green Energy (OSTI)

This report describes work conducted by the Oregon Department of Fish and Wildlife (ODFW) and the Washington Department of Fish and Wildlife (WDFW) from 1 October 1998 to 30 September 1999. The work is part of studies to evaluate spawning of fall chinook salmon (Oncorhynchus tshawytscha) and chum salmon (O. keta) below the four lowermost Columbia River dams under the Bonneville Power Administration's Project 99-003. The purpose of this project is twofold: (1) Document the existence of fall chinook and chum populations spawning below Bonneville Dam (river mile (RM) 145), The Dalles Dam (RM 192), John Day Dam (RM 216), and McNary Dam (RM 292) (Figure 1) and estimate the size of these populations; and (2) Profile stocks for important population characteristics; including spawning time, genetic make-up, emergence timing, migration size and timing, and juvenile to adult survival rates. Specific tasks conducted by ODFW and WDFW during this period were: (1) Documentation of fall chinook and chum spawning below Bonneville, The Dalles, John Day and McNary dams using on-water observations; (2) Collection of biological data to profile stocks in areas described in Task 1; (3) Determination of spawning population estimates and age composition, average size at return, and sex ratios in order to profile stocks in areas described in Task 1; (4) Collection of data to determine stock origin of adult salmon found in areas described in Task 1; (5) Determination of possible stock origins of adult salmon found in areas described in Task 1 using tag rates based on coded-wire tag recoveries and genetic baseline analysis; (6) Determination of emergence timing and hatching rate of juvenile fall chinook and chum below Bonneville Dam; (7) Determination of migration time and size for juvenile fall chinook and chum rearing in the area described in Task 6; (8) Investigation of feasibility of determining stock composition of juvenile fall chinook and chum rearing in the area described in Task 6; (9) Documentation of stranding and entrapment in low-lying areas of juvenile fall chinook and chum rearing in the area described in Task 6; and (10) Investigation of feasibility of coded-wire tagging juvenile fall chinook captured in the area described in Task 6 to determine juvenile to adult survival rate.

van der Naald, Wayne; Clark, Roy; Spellman, Bryant

1999-12-01T23:59:59.000Z

253

Total Dissolved Gas Monitoring in Chum Salmon Spawning Gravels Below Bonneville Dam  

DOE Green Energy (OSTI)

At the request of the U.S. Army Corps of Engineers (Portland District), Pacific Northwest National Laboratory (PNNL) conducted research to determine whether total dissolved gas concentrations are elevated in chum salmon redds during spring spill operations at Bonneville Dam. The study involved monitoring the total dissolved gas levels at egg pocket depth and in the river at two chum salmon spawning locations downstream from Bonneville Dam. Dissolved atmospheric gas supersaturation generated by spill from Bonneville Dam may diminish survival of chum (Oncorhynchus keta) salmon when sac fry are still present in the gravel downstream from Bonneville Dam. However, no previous work has been conducted to determine whether total dissolved gas (TDG) levels are elevated during spring spill operations within incubation habitats. The guidance used by hydropower system managers to provide protection for pre-emergent chum salmon fry has been to limit TDG to 105% after allowing for depth compensation. A previous literature review completed in early 2006 shows that TDG levels as low as 103% have been documented to cause mortality in sac fry. Our study measured TDG in the incubation environment to evaluate whether these levels were exceeded during spring spill operations. Total dissolved gas levels were measured within chum salmon spawning areas near Ives Island and Multnomah Falls on the Columbia River. Water quality sensors screened at egg pocket depth and to the river were installed at both sites. At each location, we also measured dissolved oxygen, temperature, specific conductance, and water depth to assist with the interpretation of TDG results. Total dissolved gas was depth-compensated to determine when levels were high enough to potentially affect sac fry. This report provides detailed descriptions of the two study sites downstream of Bonneville Dam, as well as the equipment and procedures employed to monitor the TDG levels at the study sites. Results of the monitoring at both sites are then presented in both text and graphics. The findings and recommendations for further research are discussed, followed by a listing of the references cited in the report.

Arntzen, Evan V.; Geist, David R.; Panther, Jennifer L.; Dawley, Earl

2007-01-30T23:59:59.000Z

254

Department of Energy, Bonneville Power Administration Delivery of the Canadian Entitlement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

349 349 Federal Register / Vol. 64, No. 75 / Tuesday, April 20, 1999 / Notices which is available free at either of the preceding sites. If you have questions about using the pdf, call the U.S. Government Printing officer toll free at 1-888-293-6498. Note: The official version of this document is the document published in the Federal Register. Program Authority: 20 U.S.C. 7131. Dated: April 16, 1999. (Catalog of Federal Domestic Assistance Number 84.184H Office of Elementary and Secondary Education-Safe and Drug-Free Schools and Communities National Programs-Federal Activities -State and Regional Coalition Grant Competition to Prevent High-Risk Drinking Among College Students) Judith Johnson, Acting Assistant Secretary for Elementary and Secondary Education. [FR Doc. 99-10025 Filed 4-19-99; 8:45 am]

255

EIS-0312: Notice of Availability of the Bonneville Power Administration Administrator's Record of Decision  

Energy.gov (U.S. Department of Energy (DOE))

Columbia Basin Fish Accords Memorandum of Agreement (MOA) with the Kalispel Tribe on Columbia Basin Fish Accords

256

Distribution of Extreme Winds in the Bonneville Power Administration Service Area  

Science Conference Proceedings (OSTI)

Annual extreme 1 min wind speeds at 78 Pacific Northwest locations were analyzed using the Fisher-Tippet type II extreme value function. From computed mean recurrence intervals, we could easily determine the wind speed likely to recur in a ...

J. William Wantz; Robert E. Sinclair

1981-12-01T23:59:59.000Z

257

Bonneville Power Administration Fish and Wildlife Implementation Plan, October 23, 1999  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

488 488 Federal Register / Vol. 64, No. 202 / Wednesday, October 20, 1999 / Notices DEPARTMENT OF COMMERCE Patent and Trademark Office Performance Review Board AGENCY: Patent and Trademark Office, Commerce. ACTION: Announcement of membership of the Patent and Trademark Office Performance Review Board. SUMMARY: In conformance with the Civil Service Reform Act of 1978, 5 U.S.C. 4314(c)(4), the Patent and Trademark Office announces the appointment of persons to serve as members of its Performance Review Board. ADDRESSES: Comments should be addressed to Director, Office of Human Resources, Patent and Trademark Office, One Crystal Park, Suite 707, Washington, DC 20231. FOR FURTHER INFORMATION CONTACT: Alethea Long-Green at the above address or telephone (703) 305-8062. SUPPLEMENTARY

258

Lakeview Light and Power - Energy Smart Grocer Rebate Program | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lakeview Light and Power - Energy Smart Grocer Rebate Program Lakeview Light and Power - Energy Smart Grocer Rebate Program Lakeview Light and Power - Energy Smart Grocer Rebate Program < Back Eligibility Commercial Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Manufacturing Sealing Your Home Windows, Doors, & Skylights Appliances & Electronics Commercial Lighting Lighting Other Program Info Funding Source Lakeview Light and Power and Bonneville Power Administration State District of Columbia Program Type Utility Rebate Program Rebate Amount Varies by technology Provider Lakeview Light and Power Lakeview Light and Power, in association with the Bonneville Power Administration, offers the Energy Smart Program through which grocery

259

Survival of Juvenile Chinook Salmon Passing the Bonneville Dam Spillway in 2007  

DOE Green Energy (OSTI)

The U.S. Army Corps of Engineers Portland District (CENWP) funds numerous evaluations of fish passage and survival on the Columbia River. In 2007, the CENWP asked Pacific Northwest National Laboratory to conduct an acoustic telemetry study to estimate the survival of juvenile Chinook salmon passing the spillway at Bonneville Dam. This report documents the study results which are intended to be used to improve the conditions juvenile anadromous fish experience when passing through the dams that the Corps operates on the river.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Zimmerman, Shon A.; Durham, Robin E.; Fischer, Eric S.; Kim, Jina; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; McComas, Roy L.

2008-12-01T23:59:59.000Z

260

Survival Rates of Juvenile Salmonids Passing Through the Bonneville Dam and Spillway in 2008  

DOE Green Energy (OSTI)

This report describes a 2008 acoustic telemetry survival study conducted by the Pacific Northwest National Laboratory for the Portland District of the U.S. Army Corps of Engineers. The study estimated the survival of juvenile Chinook salmon and steelhead passing Bonneville Dam (BON) and its spillway. Of particular interest was the relative survival of smolts detected passing through end spill bays 1-3 and 16-18, which had deep flow deflectors immediately downstream of spill gates, versus survival of smolts passing middle spill bays 4-15, which had shallow flow deflectors.

Ploskey, Gene R.; Weiland, Mark A.; Faber, Derrek M.; Deng, Zhiqun; Johnson, Gary E.; Hughes, James S.; Zimmerman, Shon A.; Monter, Tyrell J.; Cushing, Aaron W.; Wilberding, Matthew C.; Durham, Robin E.; Townsend, R. L.; Skalski, J. R.; Buchanan, Rebecca A.; Kim, Jina; Fischer, Eric S.; Meyer, Matthew M.; McComas, Roy L.; Everett, Jason

2009-12-28T23:59:59.000Z

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Network wind power over the Pacific Northwest  

DOE Green Energy (OSTI)

Since 1975 the Bonneville Power Administration (BPA) has been sponsoring wind power research at Oregon State University. A feasibility study that initially concentrated on the wind power potential in the Columbia River Gorge has expanded to the BPA service area which covers Washington, Oregon, Idaho, western Montana and northern Nevada. Previous BPA reports have documented the progress of this research.

Hewson, E W; Baker, R W; Barber, D A; Peterson, B

1978-09-01T23:59:59.000Z

262

Evaluation of Behavioral Guidance Structure on Juvenile Salmonid Passage and Survival at Bonneville Dam in 2009  

DOE Green Energy (OSTI)

Pacific Northwest National Laboratory (PNNL) conducted an acoustic-telemetry study at Bonneville Dam in 2009 to evaluate the effects of a behavioral guidance structure (BGS) in the Bonneville Dam second powerhouse forebay on fish passage and survival through the second powerhouse (B2), the dam as a whole, and through the first powerhouse and spillway combined. The BGS was deployed to increase the survival of fish passing through B2 by increasing the percentage of outmigrating smolts entering the B2 Corner Collector (B2CC)a surface flow outlet known to be a relatively benign route for downstream passage at this dam. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. Study results indicated that having turbine 11 in service is important for providing flow conditions that are comparable to those observed in pre-BGS years (2004 and 2005) and in 2008. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Faber, Derrek M.; Ploskey, Gene R.; Weiland, Mark A.; Deng, Zhiqun; Hughes, James S.; Kim, Jin A.; Fu, Tao; Fischer, Eric S.; Monter, Tyrell J.; Skalski, J. R.

2011-03-01T23:59:59.000Z

263

Record of Decision for the Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements (DOE/EIS-0266) (11/20/00)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements Administrator's Record of Decision Summary The Bonneville Power Administration (BPA) has decided to execute Transmission Services Agreements (TSAs) and Power Purchase Agreements (PPAs) with Calpine Siskiyou Geothermal Partners, L.P. (Calpine) to acquire output from the Fourmile Hill Geothermal Development Project (Project). Initially, BPA will execute one or more PPAs in order to acquire up to the entire Project output. TSAs will be executed before the Project becomes operational. The United States Forest Service (Forest Service) and the Bureau of Land Management (BLM) were the joint lead Federal agencies in the preparation of

264

Evaluation of the Fish Passage Effectiveness of the Bonneville I Prototype Surface Collector using Three-Dimensional Ultrasonic Fish Tracking  

Science Conference Proceedings (OSTI)

This report describes tests conducted at Bonneville Dam on the Columbia River in the spring of 2000 using three-dimensional acoustic telemetry and computational fluid dynamics hydraulic modeling to observe the response of outmigrating juvenile steelhead and yearling chinook to a prototype surface collector installed at the Powerhouse. The study described in this report was one of several conducted for the U.S. Army Corps of Engineers to prepare a decision document on which of two bypass methods: surface flow bypass or extended-length submersible bar screens to use to help smolts pass around Bonneville dams without going through the turbines.

Faber, Derrek M.; Weiland, Mark A.; Moursund, Robert; Carlson, Thomas J.; Adams, Noah; Rhondorf, D.

2001-05-01T23:59:59.000Z

265

Monitoring and Evaluation of the Prototype Surface Collector at Bonneville First Powerhouse in 2000: Synthesis of Results  

DOE Green Energy (OSTI)

This report describes research done to evaluate the Prototype Surface Collector at Bonneville Dam, Powerhouse I, on the Columbia River. The surface collector is being evaluated as a means for bringing downstream migrating salmon and steelhead through the powerhouse while avoiding the turbines. The report describes evaluations conducted by PNNL, National Marine Fisheries Service, and various contractors using radio telemetry, hydroacoustics, and computational fluid dynamics models. The evaluation will provide information to the U.S. Army Corps of Engineers for their 2001 decision on whether to use surface flow bypass or extended-length submersible bar screens for long-term smolt passage at Bonneville Dam.

Carlson, Thomas J

2001-06-01T23:59:59.000Z

266

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 22, 2012 June 22, 2012 CX-008692: Categorical Exclusion Determination Amendment Number 2 to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 06/22/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration June 21, 2012 CX-008695: Categorical Exclusion Determination Munro Control Center Expansion CX(s) Applied: B1.15 Date: 06/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 20, 2012 CX-008694: Categorical Exclusion Determination Acquisition and Disposition of Property CX(s) Applied: B1.24 Date: 06/20/2012 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration June 20, 2012 CX-008693: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Centralia No. 2 115 Kilovolt Transmission Line

267

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 - 11670 of 31,917 results. 61 - 11670 of 31,917 results. Download CX-008692: Categorical Exclusion Determination Amendment Number 2 to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 06/22/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008692-categorical-exclusion-determination Download CX-008698: Categorical Exclusion Determination Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008698-categorical-exclusion-determination Download CX-008699: Categorical Exclusion Determination Old Highway Bridge Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration

268

Wildlife Impact Assessment : Bonneville, McNary, The Dalles, and John Day Projects.  

DOE Green Energy (OSTI)

The Habitat Evaluation Procedures (HEP) were used to evaluate pre- and post-construction habitat conditions of the US Army Corps of Engineers Bonneville project in Oregon and Washington. The project directly impacted 20,749 acres of wildlife habitat. Seven evaluation species were selected with losses and gains expressed in Habitat Units (HU's). One HU is equivalent to 1 acre of prime habitat. The evaluation estimated a gain of 2671 HU's of lesser scaup wintering habitat. Losses of 4300 HU's of great blue heron habitat, 2443 HU's of Canada goose habitat, 2767 HU's of spotted sandpiper habitat, 163 HU's of yellow warbler habitat, 1022 HU's black-capped chickadee habitat, and 1622 HU's of mink habitat occurred as a result of the project. This amounts to a total combined loss of 12,317 HU's. 18 refs., 1 fig., 4 tabs.

Rasmussen, Larry; Wright, Patrick

1990-10-01T23:59:59.000Z

269

Synthesis of Biological Reports on Juvenile Fish Passage and Survival at Bonneville Dam through 2005  

DOE Green Energy (OSTI)

This report describes a review of available literature on juvenile salmonid passage at Bonneville Dam from 1939 through 2005. Studies of interest included project-wide fish-passage efficiency (FPE) studies by radio telemetry and fixed-aspect hydroacoustics, fish survival studies (direct and indirect), FGE studies, powerhouse and unit (by netting, hydroacoustics, and radio telemetry), predation studies in the forebay and tailrace, behavioral studies on forebay approach and egress, and surface-bypass studies. The FPE effort will include a review of available distribution data (horizontal, diel, and vertical) for juvenile salmon. This study does not repeat the results of previous review and synthesis studies but cites them. Where no previous review exists for a subject area, all reports were reviewed and synthesized. The report includes an annotated bibliography summarizing each of the documents reviewed and a DVD disk containing all of the original papers and reports along with an HTML index to the documents.

Ploskey, Gene R.; Johnson, Gary E.; Giorgi, Albert E.; Johnson, Richard L.; Stevenson, John R.; Schilt, Carl R.; Johnson, Peter N.; Patterson, Deborah S.

2005-06-01T23:59:59.000Z

270

Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing Through Bonneville Dam, 2010  

Science Conference Proceedings (OSTI)

Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, T. D.; Monter, Tyrell J.; Skalski, J. R.; Townsend, Richard L.; Zimmerman, Shon A.

2012-09-01T23:59:59.000Z

271

Survival and Passage of Juvenile Chinook Salmon and Steelhead Passing through Bonneville Dam, 2010  

DOE Green Energy (OSTI)

Pacific Northwest National Laboratory (PNNL) and subcontractors conducted an acoustic-telemetry study of juvenile salmonid fish passage and survival at Bonneville Dam in 2010. The study was conducted to assess the readiness of the monitoring system for official compliance studies under the 2008 Biological Opinion and Fish Accords and to assess performance measures including route-specific fish passage proportions, travel times, and survival based upon a single-release model. This also was the last year of evaluation of effects of a behavioral guidance device installed in the Powerhouse 2 forebay. The study relied on releases of live Juvenile Salmon Acoustic Telemetry System tagged smolts in the Columbia River and used acoustic telemetry to evaluate the approach, passage, and survival of passing juvenile salmon. This study supports the U.S. Army Corps of Engineers continual effort to improve conditions for juvenile anadromous fish passing through Columbia River dams.

Ploskey, Gene R.; Weiland, Mark A.; Hughes, James S.; Woodley, Christa M.; Deng, Zhiqun; Carlson, Thomas J.; Kim, Jin A.; Royer, Ida M.; Batten, George W.; Cushing, Aaron W.; Carpenter, Scott M.; Etherington, D. J.; Faber, Derrek M.; Fischer, Eric S.; Fu, Tao; Hennen, Matthew J.; Mitchell, Tyler; Monter, Tyrell J.; Skalski, John R.; Townsend, Richard L.; Zimmerman, Shon A.

2011-12-01T23:59:59.000Z

272

Hydroacoustic Evaluation of Fish-Passage Efficiency at Bonneville Dam in 2001  

DOE Green Energy (OSTI)

The Portland District of the U.S. Army Corps of Engineers requested that scientists with the Pacific Northwest National Laboratory (PNNL) and the U.S. Army Engineer Research and Development Center (ERDC) conduct the hydroacoustic fish-passage studies described in this report. The ERDC also contracted with MEVATEC Corporation and Dyntel to provide staff ranging from scientists to technicians for the study. This study supports the Portland-District goal of maximizing fish passage efficiency (FPE) and obtaining 95% survival for juvenile salmon passing the Bonneville Project. This report presents results of two hydroacoustic studies of juvenile salmonids. One was a Project-wide study of fish-passage efficiency, and the other was more narrowly focused upon the approach, vertical distribution, and fish-guidance efficiency (FGE) of fish at Unit 15, where the Portland District extensively modified the gatewell and vertical barrier screen to improve gatewell flow and FGE. The goal of the larger of the two studies was to provide project-wide estimates of FPE, spill efficiency, and spill effectiveness for run-of-river fish passing the Bonneville Project during the 2001 out-migration. This type of study also provides estimates of the horizontal, vertical, and diel distributions of fish passage and FGE by turbine unit. These data will provide a baseline for evaluating the performance of future management efforts to improve juvenile fish passage. The goal of the second study was to assess the effect of gatewell and vertical-barrier-screen modifications on the FGE of Unit 15.

Ploskey, Gene R.; Schilt, Carl R.; Hanks, Michael E.; Johnson, Peter N.; Kim, Jina; Skalski, John R.; Patterson, Deborah S.; Nagy, William T.; Lawrence, Larry R.

2002-10-11T23:59:59.000Z

273

Total Dissolved Gas Effects on Incubating Chum Salmon Below Bonneville Dam  

DOE Green Energy (OSTI)

At the request of the U.S. Army Corps of Engineers (USACE; Portland District), Pacific Northwest National Laboratory (PNNL) undertook a project in 2006 to look further into issues of total dissolved gas (TDG) supersaturation in the lower Columbia River downstream of Bonneville Dam. In FY 2008, the third year of the project, PNNL conducted field monitoring and laboratory toxicity testing to both verify results from 2007 and answer some additional questions about how salmonid sac fry respond to elevated TDG in the field and the laboratory. For FY 2008, three objectives were 1) to repeat the 2006-2007 field effort to collect empirical data on TDG from the Ives Island and Multnomah Falls study sites; 2) to repeat the static laboratory toxicity tests on hatchery chum salmon fry to verify 2007 results and to expose wild chum salmon fry to incremental increases in TDG, above those of the static test, until external symptoms of gas bubble disease were clearly present; and 3) to assess physiological responses to TDG levels in wild chum salmon sac fry incubating below Bonneville Dam during spill operations. This report summarizes the tasks conducted and results obtained in pursuit of the three objectives. Chapter 1 discusses the field monitoring, Chapter 2 reports the findings of the laboratory toxicity tests, and Chapter 3 describes the field-sampling task. Each chapter contains an objective-specific introduction, description of the study site and methods, results of research, and discussion of findings. Literature cited throughout this report is listed in Chapter 4. Additional details on the monitoring methodology and results are provided in Appendices A and B included on the compact disc bound inside the back cover of the printed version of this report.

Arntzen, Evan V.; Hand, Kristine D.; Carter, Kathleen M.; Geist, David R.; Murray, Katherine J.; Dawley, Earl M.; Cullinan, Valerie I.; Elston, Ralph A.; Vavrinec, John

2009-01-29T23:59:59.000Z

274

Categorical Exclusion Determinations: Southwestern Power Administration |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southwestern Power Southwestern Power Administration Categorical Exclusion Determinations: Southwestern Power Administration Categorical Exclusion Determinations issued by Southwestern Power Administration. DOCUMENTS AVAILABLE FOR DOWNLOAD August 6, 2013 CX-010879: Categorical Exclusion Determination Transmission Line 3005, Structure 290 Replacement CX(s) Applied: B4.6 Date: 08/06/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration July 25, 2013 CX-010880: Categorical Exclusion Determination Transmission Line 3016, Access Road Acquisition Project CX(s) Applied: B1.24 Date: 07/25/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration July 22, 2013 CX-010716: Categorical Exclusion Determination Short Mountain Access Road Easement Acquisition CX(s) Applied: B1.24

275

EIS-0471: Department of Energy Loan Guarantee to Support Proposed Eagle Rock Enrichment Facility in Bonneville County, Idaho  

Energy.gov (U.S. Department of Energy (DOE))

This EIS evaluates the environmental impacts of construction, operation, and decommissioning of the proposed Eagle Rock Enrichment Facility (EREF), a gas centrifuge uranium enrichment facility to be located in a rural area in western Bonneville County, Idaho. (DOE adopted this EIS issued by NRC on 04/13/2007.)

276

Fort Lewis, Yakima Firing Center, and Vancouver Barracks/Camp Bonneville basewide energy use plan; executive summary. Final report  

SciTech Connect

This Executive Summary presents an overview of a series of studies, mostly energy related, of Fort Lewis, Yakima Firing Center, Vancouver Barracks, and Camp Bonneville. Collectively, the work is known as the Basewide Energy Use Plan and is a part of the Energy Conservation Investment Program (ECIP).

Smiley, D.P.

1984-03-01T23:59:59.000Z

277

(DOE/EIS-0285/SA-63): Supplement Analysis for the Transmission System Vegetation Management Program FEIS, North Bonneville-Midway and Hanford-Ostrander 4/22/02  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2002 2, 2002 REPLY TO ATTN OF: KEP-4 SUBJECT: Supplement Analysis for the Transmission System Vegetation Management Program FEIS, North Bonneville-Midway and Hanvor-Ostrander (DOE/EIS-0285/SA-63) Elizabeth Johnson - TFR/The Dalles Natural Resource Specialist Proposed Action: Vegetation Management on the North Bonneville-Midway and Hanford- Ostrander transmission line right-of-way (approx. 702 acres). The project area begins at the North Bonneville Substation and terminates at structure 25/3+500. For most of the length of the right-of-way, the width is 300 feet wide on the North Bonneville-Midway Line and 150 feet wide for the Hanford- Ostrander Line. Location: The ROW is located in North Bonneville, Skamania County, OR, being in the

278

Categorical Exclusion Determinations: Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 16, 2012 May 16, 2012 CX-008718: Categorical Exclusion Determination Revolution Energy Services (RES) Agriculture (Ag) - Forest Glen Oaks LLC Biomass Project CX(s) Applied: B4.13 Date: 05/16/2012 Location(s): Oregon Offices(s): Bonneville Power Administration May 1, 2012 CX-008153: Categorical Exclusion Determination Maupin-Tygh Valley Number 1 Pole Replacement Project CX(s) Applied: B1.3 Date: 05/01/2012 Location(s): Oregon Offices(s): Bonneville Power Administration April 23, 2012 CX-008160: Categorical Exclusion Determination Wood Pole Replacement on The Dalles-Discovery Number 1 Transmission Line CX(s) Applied: B1.3 Date: 04/23/2012 Location(s): Oregon Offices(s): Bonneville Power Administration April 20, 2012 CX-008232: Categorical Exclusion Determination Recovery Act: State Geological Survey Contributions to the National

279

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 15, 2013 July 15, 2013 CX-010738: Categorical Exclusion Determination 2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration July 2, 2013 CX-010588: Categorical Exclusion Determination Chehalis Substation Tree Clearing CX(s) Applied: B1.3 Date: 07/02/2013 Location(s): Washington Offices(s): Bonneville Power Administration July 1, 2013 CX-010589: Categorical Exclusion Determination Nine Canyon Communication Tower Addition CX(s) Applied: B4.6 Date: 07/01/2013 Location(s): Washington Offices(s): Bonneville Power Administration June 25, 2013 CX-010429: Categorical Exclusion Determination Harbour Pointe Small Generator Integration

280

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 30660 of 31,917 results. 51 - 30660 of 31,917 results. Download CX-010592: Categorical Exclusion Determination Big Eddy-Redmond Conductor Maintenance CX(s) Applied: B1.3 Date: 06/24/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010592-categorical-exclusion-determination Download CX-010586: Categorical Exclusion Determination Umatilla Electric Cooperative CX(s) Applied: B4.9 Date: 07/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010586-categorical-exclusion-determination Download CX-010587: Categorical Exclusion Determination Mariah Wind CX(s) Applied: B1.7 Date: 07/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010587-categorical-exclusion-determination

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 7630 of 26,764 results. 21 - 7630 of 26,764 results. Download CX-008698: Categorical Exclusion Determination Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008698-categorical-exclusion-determination Download CX-008699: Categorical Exclusion Determination Old Highway Bridge Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008699-categorical-exclusion-determination Download CX-008700: Categorical Exclusion Determination Natapoc Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008700-categorical-exclusion-determination

282

Categorical Exclusion Determinations: B1.25 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 12, 2012 June 12, 2012 CX-008699: Categorical Exclusion Determination Old Highway Bridge Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 12, 2012 CX-008698: Categorical Exclusion Determination Poorman Ponds Property Funding CX(s) Applied: B1.25 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration June 5, 2012 CX-008701: Categorical Exclusion Determination Spring Basin Wilderness Land Exchange CX(s) Applied: B1.25 Date: 06/05/2012 Location(s): Oregon Offices(s): Bonneville Power Administration May 2, 2012 CX-008151: Categorical Exclusion Determination Provision of Funds to the Columbia Land Trust For Purchase of Five Parcels of Land Located Near the Lower Elochoman River

283

Categorical Exclusion Determinations: Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 20, 2013 March 20, 2013 CX-010161: Categorical Exclusion Determination Buckley-Marion Overhead Groundwire Replacement Project CX(s) Applied: B1.3 Date: 03/20/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration March 20, 2013 CX-010160: Categorical Exclusion Determination Sundial Island Transmission Tower Relocation CX(s) Applied: B4.6 Date: 03/20/2013 Location(s): Oregon Offices(s): Bonneville Power Administration March 13, 2013 CX-010162: Categorical Exclusion Determination Revenue Meter Replacement at Oregon Trail Electric Co-op's (OTEC's) West John Day Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration March 11, 2013 CX-010164: Categorical Exclusion Determination 2013 Spacer and Insulator Replacement Program: First and Second Quarter

284

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 30790 of 31,917 results. 81 - 30790 of 31,917 results. Download CX-010344: Categorical Exclusion Determination Alvey District Wood Poles CX(s) Applied: B1.3 Date: 05/09/2013 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010344-categorical-exclusion-determination Download CX-010424: Categorical Exclusion Determination Grand Coulee District Wood Replacement CX(s) Applied: B1.3 Date: 06/07/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010424-categorical-exclusion-determination Download CX-010432: Categorical Exclusion Determination De-energized Wood Pole Removal Project CX(s) Applied: B4.10 Date: 06/05/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

285

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 13390 of 31,917 results. 81 - 13390 of 31,917 results. Download CX-010433: Categorical Exclusion Determination Memaloose Meadows Land Acquisition CX(s) Applied: B1.25 Date: 06/04/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010433-categorical-exclusion-determination Download CX-010584: Categorical Exclusion Determination Kokanee Bend South Conservation Easement Funding CX(s) Applied: B1.25 Date: 07/10/2013 Location(s): Montana Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010584-categorical-exclusion-determination Download CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration

286

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Desert Southwest Region Desert Southwest Region Categorical Exclusion Determinations: Western Area Power Administration-Desert Southwest Region Categorical Exclusion Determinations issued by Western Area Power Administration-Desert Southwest Region. DOCUMENTS AVAILABLE FOR DOWNLOAD August 22, 2013 CX-010882: Categorical Exclusion Determination Liberty-Parker Dam #2 230-Kilovolt Transmission Line, Optical Power Ground Wire Repair CX(s) Applied: B4.7 Date: 08/22/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region August 12, 2013 CX-010883: Categorical Exclusion Determination PHX-LOB and LIB-LOB 230-Kilovolt Double-Circuit- Replace Insulators at Structure No. 28-2 With NCI Type Polymers CX(s) Applied: B1.3 Date: 08/12/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

287

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2001 - 12010 of 26,764 results. 2001 - 12010 of 26,764 results. Download CX-010726: Categorical Exclusion Determination Big Eddy-Redmond No.1 Wood Pole Replacement Project CX(s) Applied: B1.3 Date: 08/14/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010726-categorical-exclusion-determination Download CX-010736: Categorical Exclusion Determination Capacity Increase on Bonneville Power Administration's (BPA) Horse Ranch Tap Line CX(s) Applied: B4.6 Date: 07/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010736-categorical-exclusion-determination Download CX-010737: Categorical Exclusion Determination Insulator Replacement on Bonneville Power Administration's (BPA) North

288

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Upper Great Plains Region Upper Great Plains Region Categorical Exclusion Determinations: Western Area Power Administration-Upper Great Plains Region Categorical Exclusion Determinations issued by Western Area Power Administration-Upper Great Plains Region. DOCUMENTS AVAILABLE FOR DOWNLOAD March 22, 2013 CX-010553: Categorical Exclusion Determination Appledorn Substation Construction CX(s) Applied: B4.11 Date: 03/22/2010 Location(s): Minnesota Offices(s): Western Area Power Administration-Upper Great Plains Region December 3, 2012 CX-009534: Categorical Exclusion Determination Construct New Transmission Line and Footings, Garrison Switchyard CX(s) Applied: B4.13 Date: 12/03/2012 Location(s): North Dakota Offices(s): Western Area Power Administration-Upper Great Plains Region October 11, 2011

289

City of North Bonneville, Washington: Geothermal Exploration Project, production test well, Phase II. Final report  

SciTech Connect

Based on discussions with the City of North Bonneville, the production test well was drilled to a depth that would also explore for ground water temperatures near 130/sup 0/F (54.4/sup 0/C). Depth projections to a 130/sup 0/F bottom hole temperature were made by assuming a constant ground water temperature rise greater than 50/sup 0/C per kilometer, and by assuming that essentially homogeneous or equivalent conductive rock units would be encountered. Minimum water production requirements were not set, although the City determined that about 800 gpm would be acceptable. Large upper casing diameters of 16 and 12 inches were installed in order to provide the future use of either a vertical turbine or submersible pump, as desired by the city. The scope of work included interpretation of well characteristics, evaluation of ground water as a geothermal resource, geologic analysis of data from drilling and testing, drilling supervision, daily drilling cost accounting, and preparation of a final report. The report includes geologic evaluation of the drilling and test data, ground water and geothermal potential.

Not Available

1982-06-01T23:59:59.000Z

290

Bonneville Second Powerhouse Tailrace and High Flow Outfall: ADCP and drogue release field study  

DOE Green Energy (OSTI)

The Bonneville Project is one of four US Army Corps of Engineers operated dams along the Lower Columbia River. Each year thousands of smelt pass through this Project on their way to the Pacific Ocean. High flow outfalls, if specifically designed for fish passage, are thought to have as good or better smelt survival rates as spillways. To better understand the hydrodynamic flow field around an operating outfall, the Corps of Engineers commissioned measurement of water velocities in the tailrace of the Second Powerhouse. These data also are necessary for proper calibration and verification of three-dimensional numerical models currently under development at PNNL. Hydrodynamic characterization of the tailrace with and without the outfall operating was accomplished through use of a surface drogue and acoustic Doppler current profiler (ADCP). Both the ADCP and drogue were linked to a GPS (global positioning system); locating the data in both space and time. Measurements focused on the area nearest to the high flow outfall, however several ADCP transects and drogue releases were performed away from the outfall to document ambient flow field conditions when the outfall was not operating.

Cook, Chris B; Richmond, Marshall C; Guensch, Greg

2001-03-20T23:59:59.000Z

291

Water Velocity Measurements on a Vertical Barrier Screen at the Bonneville Dam Second Powerhouse  

Science Conference Proceedings (OSTI)

Fish screens at hydroelectric dams help to protect rearing and migrating fish by preventing them from passing through the turbines and directing them towards the bypass channels by providing a sweeping flow parallel to the screen. However, fish screens may actually be harmful to fish if they become impinged on the surface of the screen or become disoriented due to poor flow conditions near the screen. Recent modifications to the vertical barrier screens (VBS) at the Bonneville Dam second powerhouse (B2) intended to increase the guidance of juvenile salmonids into the juvenile bypass system (JBS) have resulted in high mortality and descaling rates of hatchery subyearling Chinook salmon during the 2008 juvenile salmonid passage season. To investigate the potential cause of the high mortality and descaling rates, an in situ water velocity measurement study was conducted using acoustic Doppler velocimeters (ADV) in the gatewell slot at Units 12A and 14A of B2. From the measurements collected the average approach velocity, sweep velocity, and the root mean square (RMS) value of the velocity fluctuations were calculated. The approach velocities measured across the face of the VBS varied but were mostly less than 0.3 m/s. The sweep velocities also showed large variances across the face of the VBS with most measurements being less than 1.5 m/s. This study revealed that the approach velocities exceeded criteria recommended by NOAA Fisheries and Washington State Department of Fish and Wildlife intended to improve fish passage conditions.

Hughes, James S.; Deng, Zhiqun; Weiland, Mark A.; Martinez, Jayson J.; Yuan, Yong

2011-11-22T23:59:59.000Z

292

Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville Dam; 2004-2005 Annual Report.  

DOE Green Energy (OSTI)

Pacific salmon Oncorhynchus spp. populations have declined over the last century due to a variety of human impacts. Chum salmon O. keta populations in the Columbia River have remained severely depressed for the past several decades, while upriver bright (URB) fall Chinook salmon O. tschawytscha populations have maintained relatively healthy levels. For the past seven years we have collected data on adult spawning and juvenile emergence and outmigration of URB fall Chinook and chum salmon populations in the Ives and Pierce islands complex below Bonneville Dam. In 2004, we estimated 1,733 fall Chinook salmon and 336 chum salmon spawned in our study area. Fall Chinook salmon spawning peaked 19 November with 337 redds and chum salmon spawning peaked 3 December with 148 redds. Biological characteristics continue to suggest chum salmon in our study area are similar to nearby stocks in Hardy and Hamilton creeks, and Chinook salmon we observe are similar to upriver bright stocks. Temperature data indicated that 2004 brood URB fall Chinook salmon emergence began on 6 January and ended 27 May 2005, with peak emergence occurring 12 March. Chum salmon emergence began 4 February and continued through 2 May 2005, with peak emergence occurring on 21 March. Between 13 January and 28 June, we sampled 28,984 juvenile Chinook salmon and 1,909 juvenile chum salmon. We also released 32,642 fin-marked and coded-wire tagged juvenile fall Chinook salmon to assess survival. The peak catch of juvenile fall Chinook salmon occurred on 18 April. Our results suggested that the majority of fall Chinook salmon outmigrate during late May and early June, at 70-80 mm fork length (FL). The peak catch of juvenile chum salmon occurred 25 March. Juvenile chum salmon appeared to outmigrate at 40-55 mm FL. Outmigration of chum salmon peaked in March but extended into April and May.

van der Naald, Wayne; Duff, Cameron; Friesen, Thomas A. (Oregon Department of Fish and Wildlife, Clackamas, OR)

2006-02-01T23:59:59.000Z

293

Route-Specific Passage Proportions and Survival Rates for Fish Passing through John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011  

DOE Green Energy (OSTI)

This report fulfills a request of the U.S. Army Engineer District, Portland, Oregon, to produce an interim report of estimates of route-specific fish passage proportions and survival rates for lower Columbia River dams in 2010 and 2011. The estimates are needed to update the Compass Model for the Columbia River Treaty and the new Biological Opinion before detail technical reports are published in late 2012. This report tabulates route-specific fish-passage proportions and survival rates for steelhead and Chinook salmon smolts passing through various sampled routes at John Day Dam, The Dalles Dam, and Bonneville Dam in 2010 and 2011. Results were compiled from analyses of data acquired in spring 2010 and 2011 studies that were specifically designed to estimate dam-passage and forebay-to-tailrace survival rates, travel time metrics, and spill passage efficiency, as stipulated by the 2008 Federal Columbia River Power System Biological Opinion and the Columbia Basin Fish Accords. The study designs allowed for estimation of route-specific fish passage proportions and survival rates as well as estimation of forebay-passage survival, all of which are summarized herein.

Ploskey, Gene R.; Weiland, Mark A.; Carlson, Thomas J.

2012-06-04T23:59:59.000Z

294

Evaluation of Fall Chinook and Chum Salmon Spawning below Bonneville, The Dalles, John Day, and McNary Dams; 2001-2002 Annual Report.  

DOE Green Energy (OSTI)

In 2001 a total of 309 adult fall chinook and 264 chum were sampled in the Ives and Pierce islands area below Bonneville Dam. The peak redd count for fall chinook was 48. The peak redd count for chum was 181. Peak spawning time for fall chinook was set at approximately 16 November. Peak spawning time for chum occurred approximately 26 November. There were estimated to be a total of 721 fall chinook spawning below Bonneville Dam in 2001. The 2001 chum population below Bonneville Dam was estimated to be 532 spawning fish. Temperature unit data suggests that below Bonneville Dam 2001 brood chinook emergence began on 11 March 2002 and ended 18 May 2002, with peak emergence occurring 26 April. 2001 brood juvenile chum emergence below Bonneville Dam began 29 January and continued through 31 March 2002. Peak chum emergence took place 25 February. A total of 5,487 juvenile chinook and 678 juvenile chum were sampled between the dates of 22 January and 30 July 2002 below Bonneville Dam. Juvenile chum migrated from the study area in the 40-55 mm fork length range. Migration of chum occurred during the months of March, April and May. Sampling results suggest fall chinook migration from rearing areas took place from mid June through early July 2002 when juvenile fall chinook were in the 65 to 80 mm fork length size range. Adult and juvenile sampling below Bonneville Dam provided information to assist in determining the stock of fall chinook and chum spawning and rearing below Bonneville Dam. Based on observed spawning times, adult age and sex composition, GSI analysis, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration, it appears that in 2001 and 2002 the majority of fall chinook using the area below Bonneville Dam were of a late-spawning bright stock of fall chinook. Observed spawning times, adult age and sex composition, GSI analysis, juvenile emergence timing, juvenile migration timing and juvenile size at the time of migration suggests chum spawning and rearing below Bonneville dam are similar to stocks of chum found in Hamilton and Hardy creek and are part of the Lower Columbia River Chum ESU.

van der Naald, Wayne; Clark, Roy; Spellman, Bryant (Oregon Department of Fish and Wildlife, Portland, OR)

2003-04-01T23:59:59.000Z

295

Cost-Effectiveness: Implication for Bonneville and Utility Programs Council document 2007-23 August 2007  

E-Print Network (OSTI)

own demand response. An example is a dishwasher with an economy delay cycle that waits for cheap power

296

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 24, 2013 April 24, 2013 CX-010097: Categorical Exclusion Determination Herbicide Application at Lone Butte Substation During Fiscal Year 2013 CX(s) Applied: B1.3 Date: 04/24/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region April 19, 2013 CX-010096: Categorical Exclusion Determination Herbicide Application at 36 Substations Located in Arizona and California During Fiscal Year 2013 CX(s) Applied: B1.3 Date: 04/19/2013 Location(s): Arizona, Arizona, Arizona, Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region April 8, 2013 CX-010098: Categorical Exclusion Determination Phoenix to Lone Butte 230 Kilovolt Transmission Line, Bird Diverter Installation CX(s) Applied: B1.3 Date: 04/08/2013 Location(s): CX: none

297

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 25, 2012 July 25, 2012 CX-008787: Categorical Exclusion Determination Midway Substation 230 Kilovolt Upgrades El Paso County, Colorado CX(s) Applied: B4.6, B4.11 Date: 07/25/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region July 23, 2012 CX-008784: Categorical Exclusion Determination License Outgrant to Owl Creek Water District Town of Thermopolis, Hot Springs County, Wyoming CX(s) Applied: B4.9 Date: 07/23/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region July 3, 2012 CX-008779: Categorical Exclusion Determination Curecanti-Poncha-Canon City West-Midway 230-Kilovolt Transmission Line Road Maintenance Gunnison, Chaffee, Fremont, Pueblo, and El Paso Counties, Colorado CX(s) Applied: B1.3

298

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 - 9110 of 31,917 results. 01 - 9110 of 31,917 results. Download CX-008161: Categorical Exclusion Determination Prosser Hatchery Backup Generator Replacement CX(s) Applied: B1.31 Date: 04/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008161-categorical-exclusion-determination Download CX-008716: Categorical Exclusion Determination Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008716-categorical-exclusion-determination Download EERE Program Management Guide- Chapter 2

299

CX-009197: Categorical Exclusion Determination  

Energy.gov (U.S. Department of Energy (DOE))

2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project CX(s) Applied: B1.3 Date: 09/24/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration

300

DOE/EIS-0312; Bonneville Power Administration, Fish and Wildlife Implementation Plan Draft EIS (5/2001)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Columbia River Basin Columbia River Basin BPA Service Area NZ20027a April 02, 2001 Columbia River Basin BPA Service Area than 10 micrometers ) Maintenance Moderate Serious Maintenance Moderate Serious Maintenance Federal Class I Area Coal Oil Gas Biomass* Nuclear Municipal Solid Waste Black Liquor Raw Sulfur Biogas / Methane Multiple types Solar Wind Gas Solar Wind Geothermal * Some biomass can be considered renewable. * Locations of proposed plants are approximate and not intended represent legal or claimed locations. NZ20027b April 03, 2001 Columbia River Basin BPA Service Area Flow Limited Temperature Limited Flow and Temperature Limited NZ20027j April 03, 2001 Columbia River Basin BPA Service Area Anadromous Fish Extinct Listed Anadromous Fish Species Listed Resident Fish - Bull Trout

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Bonneville Power Administration Notice of Availability of Record of Decision for Firm Non-Requirements Products and Services Contracts  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

563 563 Federal Register / Vol. 60, No. 211 / Wednesday, November 1, 1995 / Notices physical equipment, fiscal affairs, and academic methods of the Naval Academy. During the executive session these inquiries will relate to the internal personnel rules and practices of the Academy, may involve on-going criminal investigations, and include discussions of personal information the disclosure of which would constitute a clearly unwarranted invasion of personal privacy. Accordingly, the Secretary of the Navy has determined in writing that the executive session portion of the meeting shall be closed to the public because it will be concerned with matters as outlined in section 552b(c) (2), (5), (6), (7) and (9) of Title 5, United States Code. For further information concerning this meeting contact: Lieutenant

302

Field Study of Exhaust Fans for Mitigating Indoor Air Quality Problems: Final Report to Bonneville Power Administration  

E-Print Network (OSTI)

terrain class (1-5)[dflt=3J";TCL 'Input terrain class atsite. IF TCL=0 THEN TCL=3 INPUT "Are you going to use wind data froM the

Grimsrud, David T.

2009-01-01T23:59:59.000Z

303

Field Study of Exhaust Fans for Mitigating Indoor Air Quality Problems: Final Report to Bonneville Power Administration  

E-Print Network (OSTI)

operation at low fan speeds (LBL design) and operation --continuously design in the heat exchangers exhaust fans onDesign The basic objective of this project, to study the effects of exhaust fan

Grimsrud, David T.

2009-01-01T23:59:59.000Z

304

Field Study of Exhaust Fans for Mitigating Indoor Air Quality Problems: Final Report to Bonneville Power Administration  

E-Print Network (OSTI)

Fans Air-to-Air Heat Exchangers. . . . . . . . . . . . . . .expected from heat exchangers Ventilation expected fromventilation supplied by heat exchanger and exhaust flow. .

Grimsrud, David T.

2009-01-01T23:59:59.000Z

305

Field Study of Exhaust Fans for Mitigating Indoor Air Quality Problems: Final Report to Bonneville Power Administration  

E-Print Network (OSTI)

unvented combustion was Wood combustion present in housescombustion engines are a major source of the outdoor concentrations observed while wood,

Grimsrud, David T.

2009-01-01T23:59:59.000Z

306

Field Study of Exhaust Fans for Mitigating Indoor Air Quality Problems: Final Report to Bonneville Power Administration  

E-Print Network (OSTI)

Using Mechanical Ventilation Exhaust Fans Air-to-Air Heatexpected from exhaust fan A-I Infiltration contribution toIndoor Air Quality -- Exhaust Fan Mitigation" Final Report

Grimsrud, David T.

2009-01-01T23:59:59.000Z

307

Field Study of Exhaust Fans for Mitigating Indoor Air Quality Problems: Final Report to Bonneville Power Administration  

E-Print Network (OSTI)

to mount the passive samplers in a house. designed describedhouses screened for study List of Figures A.l A.2 A.3 A.4 PassivePassive Sampler Sampler Girman/Allen Girman/Allen Wednesday 16 November Test house (

Grimsrud, David T.

2009-01-01T23:59:59.000Z

308

Prepping Power Engineers for the Smart Grid | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Prepping Power Engineers for the Smart Grid Prepping Power Engineers for the Smart Grid Prepping Power Engineers for the Smart Grid June 19, 2012 - 4:01pm Addthis This video examines electrostatic induction, a phenomenon that means a conductive object in the vicinity of a power line may have energy coupled to it even if it's not connected to the line. Check out the other videos created by the partnership Bonneville Power Administration, Washington State University and the Northwest Workforce Training Center for Electric Power Engineering on their Smart Grid YouTube playlist. Joel Scruggs Public Affairs Specialist, Bonneville Power Administration BPA's High Voltage Lab: Ever wonder why electricity makes power lines sag? This video explains why. Check out the Smart Grid Workforce playlist for other videos from

309

Categorical Exclusion Determinations: Montana | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 25, 2012 June 25, 2012 CX-008443: Categorical Exclusion Determination Subtask 4.24 - Field Evaluation of a Novel Approach for Obtaining Metal Emission Data CX(s) Applied: B3.1 Date: 06/25/2012 Location(s): Montana Offices(s): National Energy Technology Laboratory June 12, 2012 CX-008696: Categorical Exclusion Determination Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration May 1, 2012 CX-008152: Categorical Exclusion Determination Whitefish In-line Hydroelectric Project CX(s) Applied: B4.1 Date: 05/01/2012 Location(s): Montana Offices(s): Bonneville Power Administration April 18, 2012 CX-008225: Categorical Exclusion Determination Recovery Act: A Demonstration System for Capturing Geothermal Energy from

310

Categorical Exclusion Determinations: Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 14, 2011 December 14, 2011 CX-007413: Categorical Exclusion Determination Transforming Photovoltaic Installations Toward Discpatchable, Schedulable Energy Solutions CX(s) Applied: A9, B3.6 Date: 12/14/2011 Location(s): Oregon Offices(s): Golden Field Office December 2, 2011 CX-007355: Categorical Exclusion Determination Modification of Metering Systems in Canby, Oregon CX(s) Applied: B1.7 Date: 12/02/2011 Location(s): Oregon Offices(s): Bonneville Power Administration December 2, 2011 CX-007354: Categorical Exclusion Determination Integration of the Farm Power Tillamook Generating Facility CX(s) Applied: B1.7 Date: 12/02/2011 Location(s): Oregon Offices(s): Bonneville Power Administration December 1, 2011 CX-007358: Categorical Exclusion Determination Integration of the University of Oregon's Cogeneration Project

311

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

25, 2013 25, 2013 CX-010158: Categorical Exclusion Determination Revenue Meter Replacement at Franklin County Public Utility District's (PUD) Taylor Flats Substation CX(s) Applied: B1.7 Date: 03/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration March 22, 2013 CX-010166: Categorical Exclusion Determination Wenatchee District Wood Pole Replacements CX(s) Applied: B1.3 Date: 03/22/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration March 22, 2013 CX-010553: Categorical Exclusion Determination Appledorn Substation Construction CX(s) Applied: B4.11 Date: 03/22/2010 Location(s): Minnesota Offices(s): Western Area Power Administration-Upper Great Plains Region March 21, 2013 CX-010246: Categorical Exclusion Determination South Table Mountain Denver West Parkway Improvements

312

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

891 - 19900 of 28,905 results. 891 - 19900 of 28,905 results. Download CX-008890: Categorical Exclusion Determination Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008890-categorical-exclusion-determination Download CX-008891: Categorical Exclusion Determination Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008891-categorical-exclusion-determination Download CX-009199: Categorical Exclusion Determination Access Road Improvement For the Kalispell-Kerr Number 1, 115-kilovolt (kV)

313

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91 - 4200 of 29,416 results. 91 - 4200 of 29,416 results. Download CX-008880: Categorical Exclusion Determination Celilo Converter Station Curtain Wall Replacement CX(s) Applied: B1.3 Date: 08/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008880-categorical-exclusion-determination Download CX-008890: Categorical Exclusion Determination Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008890-categorical-exclusion-determination Download CX-008891: Categorical Exclusion Determination Pilot Butte-La Pine No. 1 Wood Pole Replacement Project

314

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

16, 2013 16, 2013 Anthracite/Total Orange/Black Transfer of Contact-Handled Transuranic Waste to Idaho National Laboratory for Processing and Shipment to Waste Isolation Pilot Plant CX(s) Applied: B1.30 Date: 07/16/2013 Location(s): New Mexico Offices(s): Los Alamos Site Office July 16, 2013 CX-010582: Categorical Exclusion Determination Spring Creek Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration July 16, 2013 CX-010581: Categorical Exclusion Determination Little Shell Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration July 16, 2013 CX-010858: Categorical Exclusion Determination Demolition of the 745-N Excess Equipment Pad CX(s) Applied: B1.23

315

Categorical Exclusion Determinations: Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oregon Oregon Categorical Exclusion Determinations: Oregon Location Categorical Exclusion Determinations issued for actions in Oregon. DOCUMENTS AVAILABLE FOR DOWNLOAD August 26, 2013 CX-010719: Categorical Exclusion Determination Grande Ronde-Boyer Ground Impairments CX(s) Applied: B1.3 Date: 08/26/2013 Location(s): Oregon Offices(s): Bonneville Power Administration August 19, 2013 CX-010725: Categorical Exclusion Determination 2013 Ross Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 08/19/2013 Location(s): Washington, Washington, Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration August 14, 2013 CX-010787: Categorical Exclusion Determination Fire Loop Soil Excavation CX(s) Applied: B3.1, B6.1 Date: 08/14/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory

316

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Date Date Categorical Exclusion (CX) Determinations By Date September 3, 2014 CX-011089: Categorical Exclusion Determination Low-cost, Highly Transparent Flexible Low-e Coating Film to Enable Electrochromic Windows with Increased Energy Savings CX(s) Applied: A9, B3.6 Date: 09/03/2013 Location(s): Colorado Offices(s): Golden Field Office November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

317

Re-Analysis of Hydroacoustic Fish-Passage Data from Bonneville Dam after Spill-Discharge Corrections  

DOE Green Energy (OSTI)

The U.S. Army Corps of Engineers - Portland District asked Pacific Northwest National Laboratory to re-analyze four years of fixed-aspect hydroacoustic data after the District made adjustments to spill discharge estimates. In this report, we present new estimates of all major fish-passage metrics for study years 2000, 2001, 2002, and 2004, as well as estimates for 2005. This study supports the Portland District and its effort to maximize survival of juvenile salmon passing Bonneville Dam. Major passage routes through Bonneville Dam include 10 turbines and a sluiceway at Powerhouse 1 (B1), an 18-bay spillway, and eight turbines at Powerhouse 2 (B2) and a sluiceway including the B2 Corner Collector. The original reports and all associated results, discussion, and conclusions for non flow-related metrics remain valid and useful, but effectiveness measures for study years 2000, 2001, 2002, and 2004 as reported in previous reports by Ploskey et al. should be superseded with the new estimates reported here. The fish-passage metrics that changed the most were related to effectiveness. Re-analysis produced spill effectiveness estimates that ranged from 12% to 21% higher than previous estimates in spring and 16.7% to 27.5% higher in summer, but the mean spill effectiveness over all years was only slightly above 1:1 (1.17 for spring and 1.29 for summer). Conversely surface-passage effectiveness decreased in the years this metric was measured (by 10.1% in spring and 10.7% in summer of 2002 and 9.5% in spring and 10.2% in summer of 2004). The smallest changes in the re-analysis were in project fish passage efficiency (0%-1%) and spill efficiency (0.9%-3.0%).

Ploskey, Gene R.; Kim, Jina; Weiland, Mark A.; Hughes, James S.; Fischer, Eric S.

2007-06-07T23:59:59.000Z

318

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

71 - 27880 of 28,904 results. 71 - 27880 of 28,904 results. Download CX-008884: Categorical Exclusion Determination Rattlesnake Butte Property Funding CX(s) Applied: B1.25 Date: 08/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008884-categorical-exclusion-determination Download CX-008886: Categorical Exclusion Determination AT&T Fiber Addition North Bonneville-Ross No. 2 CX(s) Applied: B4.7 Date: 08/09/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008886-categorical-exclusion-determination Download D&D and Risk Assessment Tools ORISE and PNNL both developed tools to assist in the risk assessment and planning of D&D activities. PNNL developed a Risk D&D tool, a rapid

319

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 - 30110 of 31,917 results. 01 - 30110 of 31,917 results. Download CX-009204: Categorical Exclusion Determination Bonneville-Hood River Number 1 Danger Pole Replacement and Access Road Upgrades CX(s) Applied: B1.3 Date: 09/14/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-009204-categorical-exclusion-determination Download CX-009787: Categorical Exclusion Determination Rogue-Gold Beach No. 2 Disconnect Switch Replacement CX(s) Applied: B4.6 Date: 01/08/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-009787-categorical-exclusion-determination Download CX-009786: Categorical Exclusion Determination Beck Road Substation Meter Installation CX(s) Applied: B1.7 Date: 01/07/2013 Location(s): Idaho

320

Securing the Value of the Federal Columbia River Power System, Keeping Current, June 1998, Issue 98.  

DOE Green Energy (OSTI)

This report focuses on issues which will enhance the value of the Columbia River for the future. Many important decisions must be made about the Bonneville Power Administration in the coming months. These issues include the following: cost management; future fish and wildlife funding; power markets, revenues and subscription; transmission issues; and risk management.

United States. Bonneville Power Administration.

1998-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 2, Appendices A--L.  

DOE Green Energy (OSTI)

This report consists of appendices A-L of the final environmental impact statement for the Bonneville Power Administration. The appendices provide information on the following: Ninth circuit Court opinion in Forelaws on Board v. Johnson; guide to Northwest Power act contracts; guide to hydro operations; glossary; affected environment supporting documentation; environmental impacts of generic resource types; information on models used; technical information on analysis; public involvement activities; bibliography; Pacific Northwest Electric Power Planning and Conservation Act; and biological assessment. (CBS)

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

322

Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 3, Appendix M, Contract Copies.  

DOE Green Energy (OSTI)

This report, is part of the final environmental impact statement of the Bonneville Power Administration, consists of an appendix of contract copies related to the following: Detailed Index to Generic Utility Power Sales Contracts, Text of Generic Utility Contract, Detailed Index to Generic DSI Power Sales Contracts, Text of Generic DSI Contract, Text of Residential Purchase and Sale Agreement (Residential Exchange), and Detailed Index to General Contract Provisions -- GCP Form PSC-2 (Incorporated into all three types of contracts as an Exhibit).

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

323

Record of Decision for the Safety-Net Cost Recovery Adjustment Clause (SN CRAC) Adjustment to 2002 Wholesale Power Rates (DOE/EIS-0183) (6/30/03)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

BONNEVILLE POWER ADMINISTRATION BONNEVILLE POWER ADMINISTRATION NATIONAL ENVIRONMENTAL POLICY ACT RECORD OF DECISION for the Safety-Net Cost Recovery Adjustment Clause (SN CRAC) Adjustment to 2002 Wholesale Power Rates INTRODUCTION The Bonneville Power Administration (BPA) has decided to implement its proposed Safety-Net Cost Recovery Adjustment Clause (SN CRAC) Adjustment to 2002 Wholesale Power Rates. This rate adjustment allows BPA to address potential revenue shortfalls and recover its costs through rates. This rate adjustment involves implementation of one of BPA's existing risk mitigation tools that has been previously subject to review under the National Environmental Policy Act (NEPA), as described more fully below. I have reviewed this previous NEPA documentation and determined that the SN CRAC rate adjustment is adequately covered within

324

Initial Northwest Power Act Power Sales Contracts : Final Environmental Impact Statement. Volume 4, Comments and Responses.  

DOE Green Energy (OSTI)

This volume of the Initial Northwest Power Act Power Sales Contracts Final Environmental Impact Statement (Final EIS) contains public comments addressing the Initial Northwest Power Act Power Sales Contracts Draft EIS, August 1990 and Bonneville Power Administration`s (BPA) responses. The Introduction provides information about the process BPA follows in addressing these comments. Part I contains a listing of the Alternative Actions evaluated in the Final EIS; Part II is organized by Alternatives and includes summaries of the comments and BPA responses; Part III provides copies of the original comments letters, and, for ease of identification, are coded in the margins according to the alternative(s) addressed.

United States. Bonneville Power Administration.

1992-01-01T23:59:59.000Z

325

Q&A: Plugging In with a Power Lineman | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Q&A: Plugging In with a Power Lineman Q&A: Plugging In with a Power Lineman Q&A: Plugging In with a Power Lineman October 18, 2012 - 4:17pm Addthis To commemorate what BPA considers a 75-year partnership with the Columbia River, which is the cornerstone of BPA's relationship with the people and utilities of the Northwest, BPA releases the second video of a series detailing its history. You can see the rest of the series on BPA's 75th Anniversary YouTube channel. Teresa Waugh Public Affairs Specialist, Bonneville Power Administration What does a power lineman do? Linemen work on the complex electrical systems that power our homes and businesses. They climb poles to perform maintenance and work to restore downed power lines after storms. This Q&A and video are part of a series produced by the Bonneville Power

326

Evaluation of Steelhead Kelt Passage into the Bonneville Dam Second Powerhouse Corner Collector Prior to the Juvenile Migration Seasons, 2007 and 2008  

DOE Green Energy (OSTI)

This report documents the results of a steelhead kelt passage study conducted by the PNNL for the U.S. Army Corps of Engineers at Bonneville Dam in early spring 2007 and 2008. At the Second Powerhouse, a surface flow outlet called the corner collector (B2CC) may be an effective non-turbine passage route for steelhead kelt moving downstream in early spring before the main juvenile emigration season. The goal of this project was to inform management decisions regarding B2CC operations by estimating the number of kelt using the B2CC for downstream passage at Bonneville Dam prior to the juvenile spring migration season. We performed a hydroacoustic study from March 2 to April 10, 2007 and from March 13 to April 15, 2008.

Weiland, Mark A.; Kim, Jina; Nagy, William T.; Johnson, Gary E.

2009-09-01T23:59:59.000Z

327

Light-Emitting Tag Testing in Conjunction with Testing of the Minimum Gap Runner Turbine Design at Bonneville Dam Powerhouse 1  

DOE Green Energy (OSTI)

This report describes a pilot study conducted by Tom Carlson of PNNL and Mark Weiland of MEVATEC Corp to test the feasibility of using light-emitting tags to visually track objects passing through the turbine environment of a hydroelectric dam. Light sticks were released at the blade tip, mid-blade, and hub in the MGR turbine and a Kaplan turbine at Bonneville Dam and videotaped passing thru the dam to determine visibility and object trajectories.

Carlson, Thomas J

2001-01-30T23:59:59.000Z

328

CX-009512: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2: Categorical Exclusion Determination 2: Categorical Exclusion Determination CX-009512: Categorical Exclusion Determination Fiscal Year 2013 Technology Innovation Portfolio CX(s) Applied: B5.1 Date: 10/15/2012 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to fund or partially fund various federal research laboratories, universities, utilities, companies, and research institutes to conduct research and develop pilot projects that promote energy efficiency and conservation in transmission infrastructure and power grid operations through BPA's Fiscal Year 2013 Technology Innovation Portfolio. CX-009512.pdf More Documents & Publications CX-009513: Categorical Exclusion Determination CX-009201: Categorical Exclusion Determination CX-009707

329

PacifiCorp Capacity Power Sale Contract Final Environmental Impact Statement (DOE/EIS-0171)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement (DOE/EIS-0171) Statement (DOE/EIS-0171) file:///I|/Data%20Migration%20Task/EIS-0171-FEIS-1994/01.htm[6/27/2011 10:47:34 AM] PacifiCorp Capacity Power Sale Contract Final Environmental Impact Statement (DOE/EIS-0171) Responsible Agency: U.S. Department of Energy, Bonneville Power Administration (BPA) Title of Proposed Action: PacifiCorp Capacity Power Sale Contract States and Provinces Involved: Washington, Oregon, Idaho, Montana, Wyoming, Utah, Colorado, New Mexico, California, Nevada, Arizona, British Columbia. Abstract: The Bonneville Power Administration (BPA) has surplus electrical capacity (peakload energy) that BPA projects will not be required to meet its existing obligations. Such obligations include those to meet the loads of firm power customers, pursuant to the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power

330

reduced demand for power by nearly 1,500 megawatts through investments in energy  

E-Print Network (OSTI)

increased the efficiency of electricity usage in the Pacific Northwest by the equivalent of more than two and will benefit salmon and steelhead in the lower Columbia River as well as fish in the rivers and storage res for electricity, the region's utilities and the federal Bonneville Power Administration have Report: Conservation

331

Categorical Exclusion Determinations: A2 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

A2 A2 Categorical Exclusion Determinations: A2 Existing Regulations A2: Clarifying or administrative contract actions Contract interpretations, amendments, and modifications that are clarifying or administrative in nature. DOCUMENTS AVAILABLE FOR DOWNLOAD October 1, 2012 CX-009195: Categorical Exclusion Determination Amendment Number 2 to the Port Townsend Paper Corporation Power Sales Agreement CX(s) Applied: A2 Date: 10/01/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration September 14, 2012 CX-009201: Categorical Exclusion Determination Short-term Additional Amendments to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 09/14/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration July 23, 2012 CX-008892: Categorical Exclusion Determination

332

Outfall Site and Type Selection for a New Surface Flow Outlet to Pass Juvenile Salmonids at Bonneville Dams Second Powerhouse, Columbia River  

DOE Green Energy (OSTI)

A site near the downstream tip of Cascades Island with a mid-level chute outfall type was selected for the high flow (> 28.3 m3/s) outfall of the new surface flow outlet for juvenile salmonids at Bonneville Dams Second Powerhouse (B2). The new passage route and outfall are a result of modifications to the original ice and trash sluice chute to increase discharge capacity and improve passage conditions, including a new outfall type and site. Technical guidelines on high flow outfall location and design were established concurrently with the outfall development process. Critical design parameters for the new B2 outfall included discharge of 150 m3/s, jet entry velocities approaching 15.2 m/s, and a tailwater elevation range of 6.1 m. For outfall siting, the selection process began with identification of nine initial alternatives. Screening, evaluation, and selection stages narrowed the list to two outfall sites Range D 122 m directly downstream from the existing sluice chute outfall and Range F 760 m downstream near the end of Cascades Island. For outfall type, the selection process was initiated with conceptualization of 13 alternatives. Following successive screening, evaluation, consolidation, and selection stages, two outfall types became finalists Adjustable Cantilever and Mid-Level Cantilever. The four combinations of outfall site/type were evaluated in 1:30 and 1:100 scale physical hydraulic models and a Mid-Level Cantilever at the tip of Cascades Island in Range F was selected. During further engineering after our study, the cantilever was replaced with a monolith structure to reduce construction costs, resulting in a mid-level chute outfall that was installed in 2004. Post-construction evaluations indicated survival rates around 100% through the B2CC were the highest of all passage routes at Bonneville Dam. The B2CC surface flow outlet with its high flow outfall provided a major improvement to juvenile salmonid passage at Bonneville Dam.

Johnson, Gary E.; Ebberts, Blaine D.; Giorgi, Albert E.; Kuhn, Karen; Lee, Randall T.; Plump, John H.; Stensby, David A.; Sweeney, Charles E.

2008-01-01T23:59:59.000Z

333

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 21, 2012 May 21, 2012 CX-008716: Categorical Exclusion Determination Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration May 18, 2012 CX-009096: Categorical Exclusion Determination U.S. Customs and Border Protection Non-Intrusive Inspection Tests CX(s) Applied: B3.10, B3.11 Date: 05/18/2012 Location(s): Washington Offices(s): Pacific Northwest Site Office May 17, 2012 CX-008717: Categorical Exclusion Determination Relocation of Wood Poles on Centralia B Street No. 1 for Proposed Centralia City Light May Street Substation CX(s) Applied: B4.6 Date: 05/17/2012

334

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 13750 of 28,905 results. 41 - 13750 of 28,905 results. Download CX-008567: Categorical Exclusion Determination Oklahoma State Energy Program- Oklahoma Municipal Power Authority Large Systems Request AL CX(s) Applied: B5.19 Date: 06/06/2012 Location(s): Oklahoma Offices(s): Golden Field Office http://energy.gov/nepa/downloads/cx-008567-categorical-exclusion-determination Download CX-009708: Categorical Exclusion Determination FY13 Environmental Drainage Upgrades at Bonneville Power Administration's Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl, and Wren Substations CX(s) Applied: B4.6 Date: 12/03/2012 Location(s): Oregon, Montana, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-009708-categorical-exclusion-determination

335

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 30220 of 31,917 results. 11 - 30220 of 31,917 results. Download CX-007991: Categorical Exclusion Determination Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways CX(s) Applied: B1.3 Date: 02/10/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007991-categorical-exclusion-determination Download CX-007999: Categorical Exclusion Determination Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007999-categorical-exclusion-determination Download CX-008151: Categorical Exclusion Determination

336

CX-008716: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

716: Categorical Exclusion Determination 716: Categorical Exclusion Determination CX-008716: Categorical Exclusion Determination Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration The Bonneville Power Administration (BPA) and Tacoma Power (TPWR) have developed a joint plan to convert the microwave transfer trip signals on BPA's Chehalis-Covington 230 kilovolt (kV) line, which includes the 230-kV tap line to TPWR's Cowlitz Substation, from analog to digital. Microsoft Word - CX Tacoma Power Chehalis-Covington analog-digital conversion Final.docx More Documents & Publications CX-006198: Categorical Exclusion Determination

337

UTILITIES COLORADO WESTERN POWER ADMIN POC Cheryl Drake Telephone  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UTILITIES UTILITIES COLORADO WESTERN POWER ADMIN POC Cheryl Drake Telephone (720) 962-7154 Email drake@wapa.gov Electric Bulk Power Transmission and Control 221121 Electric Power Distribution 221122 GEORGIA SOUTHEASTERN POWER ADMIN POC Ann Craft Telephone (706) 213-3823 Email annc@sepa.doe.gov Electric Bulk Power Transmission and Control 221121 Electric Power Distribution 221122 OKLAHOMA SOUTHWESTERN POWER ADMIN POC Gary Bridges Telephone (918) 595-6671 Email gary.bridges@swpa.gov Electric Bulk Power Transmission and Control 221121 Electric Power Distribution 221122 OREGON BONNEVILLE POWER ADMIN POC Greg Eisenach Telephone (360) 418-8063 Email gaeisenach@bpa.gov Electric Bulk Power Transmission and Control 221121 Electric Power Distribution 221122 PENNSYLVANIA NATIONAL ENERGY TECHNOLOGY LAB - PA POC Larry Sullivan

338

Categorical Exclusion Determinations: Western Area Power  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sierra Nevada Region Sierra Nevada Region Categorical Exclusion Determinations: Western Area Power Administration-Sierra Nevada Region Categorical Exclusion Determinations issued by Western Area Power Administration-Sierra Nevada Region. DOCUMENTS AVAILABLE FOR DOWNLOAD July 3, 2013 CX-010684: Categorical Exclusion Determination Cottonwood-Roseville Optical Groundwire Project CX(s) Applied: B4.6, B4.7, B4.11, B4.13 Date: 07/03/2013 Location(s): California Offices(s): Western Area Power Administration-Sierra Nevada Region September 15, 2011 CX-006896: Categorical Exclusion Determination Maxwell - O'Banion Optical Ground Wire CX(s) Applied: B1.7, B4.6, B4.7, B4.11 Date: 09/15/2011 Location(s): Sutter County, California Office(s): Western Area Power Administration-Sierra Nevada Region, National

339

Categorical Exclusion Determinations: Idaho | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 12, 2012 June 12, 2012 CX-008696: Categorical Exclusion Determination Power Circuit Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/12/2012 Location(s): Washington, Oregon, Idaho, Montana, Wyoming Offices(s): Bonneville Power Administration June 7, 2012 CX-008731: Categorical Exclusion Determination M-10 Emergency Pump Backup Power CX(s) Applied: B2.5 Date: 06/07/2012 Location(s): Idaho Offices(s): Idaho Operations Office June 7, 2012 CX-008730: Categorical Exclusion Determination Materials and Fuels Complex Underground and Aboveground Storage Tank Replacement CX(s) Applied: B2.5 Date: 06/07/2012 Location(s): Idaho Offices(s): Idaho Operations Office May 28, 2012 CX-008734: Categorical Exclusion Determination Infrastructure for Advanced Reactor Materials Center CX(s) Applied: B2.2

340

Categorical Exclusion Determinations: B4.6 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 26, 2013 April 26, 2013 CX-010111: Categorical Exclusion Determination Animas River Substation Site Drainage Remediation CX(s) Applied: B4.6 Date: 04/26/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region March 20, 2013 CX-010160: Categorical Exclusion Determination Sundial Island Transmission Tower Relocation CX(s) Applied: B4.6 Date: 03/20/2013 Location(s): Oregon Offices(s): Bonneville Power Administration March 6, 2013 CX-010142: Categorical Exclusion Determination Install Permanent Power for Saltstone Disposal Unit Construction CX(s) Applied: B4.6 Date: 03/06/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office January 8, 2013 CX-009787: Categorical Exclusion Determination Rogue-Gold Beach No. 2 Disconnect Switch Replacement

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

891 - 8900 of 26,764 results. 891 - 8900 of 26,764 results. Download CX-009712: Categorical Exclusion Determination Malin Substation Relay Equipment Replacements CX(s) Applied: B1.7 Date: 10/19/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-009712-categorical-exclusion-determination Download CX-009514: Categorical Exclusion Determination Franklin-Badger Canyon and Grandview-Red Mountain Switch Replacements CX(s) Applied: B1.3 Date: 10/18/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-009514-categorical-exclusion-determination Download Public Outreach Fact Sheet LM's goal is to ensure that stakeholders are adequately involved in the process and informed of LM's plans and actions.

342

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 28650 of 28,904 results. 41 - 28650 of 28,904 results. Download CX-008156: Categorical Exclusion Determination Amended Provision of Funds to the Idaho Department of Fish and Game (IDFG) to Purchase the Rapid Lightning Creek Property CX(s) Applied: B1.25 Date: 04/24/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008156-categorical-exclusion-determination Download CX-008161: Categorical Exclusion Determination Prosser Hatchery Backup Generator Replacement CX(s) Applied: B1.31 Date: 04/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008161-categorical-exclusion-determination Download CX-008166: Categorical Exclusion Determination Amended: Acquisition of a Portion of Cowlitz County Public Utility

343

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 30830 of 31,917 results. 21 - 30830 of 31,917 results. Download CX-007986: Categorical Exclusion Determination Pearl-Marion #1 Tower 6/2 Replacement Project CX(s) Applied: B4.6 Date: 02/23/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007986-categorical-exclusion-determination Download CX-008163: Categorical Exclusion Determination Portland General Electric 13-Kilovolt Overhead Electrical Line Land Use Review Request CX(s) Applied: B4.9 Date: 03/28/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008163-categorical-exclusion-determination Download CX-008250: Categorical Exclusion Determination Geotechnical Core Drilling for USGS 138 CX(s) Applied: B3.1 Date: 04/18/2012 Location(s): Idaho

344

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 12960 of 29,416 results. 51 - 12960 of 29,416 results. Download Audit Report: OAS-L-12-05 The Joint Actinide Shock Physics Experimental Research Facility at the Nevada National Security Site http://energy.gov/ig/downloads/audit-report-oas-l-12-05 Download CX-010151: Categorical Exclusion Determination Brasada-Harney No. 1 Wood Pole Replacement Project CX(s) Applied: B1.3 Date: 04/12/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010151-categorical-exclusion-determination Download CX-010424: Categorical Exclusion Determination Grand Coulee District Wood Replacement CX(s) Applied: B1.3 Date: 06/07/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010424-categorical-exclusion-determination

345

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 10890 of 29,416 results. 81 - 10890 of 29,416 results. Download CX-010587: Categorical Exclusion Determination Mariah Wind CX(s) Applied: B1.7 Date: 07/03/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010587-categorical-exclusion-determination Download CX-010579: Categorical Exclusion Determination McLoughlin Substation Metering Panel Ownership Transfer CX(s) Applied: B1.24 Date: 07/23/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010579-categorical-exclusion-determination Download CX-010723: Categorical Exclusion Determination Douglas County Public Utility District (PUD) Fiber Land Use Review Request; Case #20130491 CX(s) Applied: B4.9 Date: 08/19/2013 Location(s): Washington

346

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

851 - 860 of 9,640 results. 851 - 860 of 9,640 results. Download CX-008689: Categorical Exclusion Determination 2012 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 06/28/2012 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008689-categorical-exclusion-determination Download CX-010424: Categorical Exclusion Determination Grand Coulee District Wood Replacement CX(s) Applied: B1.3 Date: 06/07/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010424-categorical-exclusion-determination Download Technical Standards,DOE Standards and Corresponding Directives Crosswalk- February 2, 2002 DOE Standards and Corresponding Directives Crosswalk

347

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 26130 of 28,904 results. 21 - 26130 of 28,904 results. Download CX-010341: Categorical Exclusion Determination Chandler Tap Line Reconductoring CX(s) Applied: B4.6 Date: 05/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010341-categorical-exclusion-determination Download CX-010429: Categorical Exclusion Determination Harbour Pointe Small Generator Integration CX(s) Applied: B1.7 Date: 06/25/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010429-categorical-exclusion-determination Download Audit Report: OAS-L-13-12 The Kansas City Responsive Infrastructure Manufacturing and Sourcing Program http://energy.gov/ig/downloads/audit-report-oas-l-13-12 Article Top 8 Things You Didn't Know About Distributed Wind

348

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 4220 of 28,905 results. 11 - 4220 of 28,905 results. Download CX-010426: Categorical Exclusion Determination Vista View Fields Land Acquisition CX(s) Applied: B1.25 Date: 06/19/2013 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010426-categorical-exclusion-determination Download CX-010433: Categorical Exclusion Determination Memaloose Meadows Land Acquisition CX(s) Applied: B1.25 Date: 06/04/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010433-categorical-exclusion-determination Download Environmental Effects Abroad of Major Federal Actions On January 4, 1979, President Carter signed Executive Order 12114, entitled Environmental Effects of Major Federal Actions. The purpose of this Council

349

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 5190 of 26,777 results. 81 - 5190 of 26,777 results. Download CX-008153: Categorical Exclusion Determination Maupin-Tygh Valley Number 1 Pole Replacement Project CX(s) Applied: B1.3 Date: 05/01/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008153-categorical-exclusion-determination Download CX-008154: Categorical Exclusion Determination In-Kind Wood Pole Replacements - Driscoll-Naselle Number 1 CX(s) Applied: B1.3 Date: 04/30/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008154-categorical-exclusion-determination Download National Environmental Justice Advisory Council Federal Facilities Working Group Report Environmental Justice and Federal Facilities: recommendations for improving

350

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 12730 of 26,764 results. 21 - 12730 of 26,764 results. Download CX-010432: Categorical Exclusion Determination De-energized Wood Pole Removal Project CX(s) Applied: B4.10 Date: 06/05/2013 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010432-categorical-exclusion-determination Download CX-010729: Categorical Exclusion Determination 2013 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 08/12/2013 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010729-categorical-exclusion-determination-0 Download CX-008250: Categorical Exclusion Determination Geotechnical Core Drilling for USGS 138 CX(s) Applied: B3.1 Date: 04/18/2012 Location(s): Idaho

351

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91 - 13400 of 31,917 results. 91 - 13400 of 31,917 results. Download CX-008693: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Centralia No. 2 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 06/20/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008693-categorical-exclusion-determination Download CX-008694: Categorical Exclusion Determination Acquisition and Disposition of Property CX(s) Applied: B1.24 Date: 06/20/2012 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008694-categorical-exclusion-determination Download Independent Activity Report, Savannah River Remediation- July 2010 Savannah River Operations Office Integrated Safety Management System Phase

352

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91 - 12000 of 26,764 results. 91 - 12000 of 26,764 results. Download CX-009558: Categorical Exclusion Determination PMVI Bay Area Photovoltaic Consortium CX(s) Applied: A9, B3.15, B3.6 Date: 12/04/2012 Location(s): California Offices(s): Golden Field Office http://energy.gov/nepa/downloads/cx-009558-categorical-exclusion-determination Download CX-009708: Categorical Exclusion Determination FY13 Environmental Drainage Upgrades at Bonneville Power Administration's Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl, and Wren Substations CX(s) Applied: B4.6 Date: 12/03/2012 Location(s): Oregon, Montana, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-009708-categorical-exclusion-determination Download CX-009711: Categorical Exclusion Determination

353

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington Washington Categorical Exclusion Determinations: Washington Location Categorical Exclusion Determinations issued for actions in Washington. DOCUMENTS AVAILABLE FOR DOWNLOAD November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration September 24, 2013 CX-011171: Categorical Exclusion Determination Longview and Tillamook Substation Communication Upgrades CX(s) Applied: B1.7 Date: 09/24/2013

354

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 14730 of 28,905 results. 21 - 14730 of 28,905 results. Download CX-009697: Categorical Exclusion Determination Tualatin Valley Water District Waterline Land Use Review Request CX(s) Applied: B4.9 Date: 12/31/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-009697-categorical-exclusion-determination Download CX-010436: Categorical Exclusion Determination Tri-Cities Maintenance Headquarters Project CX(s) Applied: B1.15 Date: 06/03/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010436-categorical-exclusion-determination Download FAQS Reference Guide - Criticality Safety This reference guide addresses the competency statements in the April 2009 edition of DOE-STD-1173-2009, Criticality Safety Functional Area

355

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 28250 of 28,904 results. 41 - 28250 of 28,904 results. Download CX-007995: Categorical Exclusion Determination Upgrade of the Existing Septic System at the Big Eddy Substation and Maintenance Facility CX(s) Applied: B4.6 Date: 02/07/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007995-categorical-exclusion-determination Download CX-007996: Categorical Exclusion Determination Rocky Reach-Maple Valley #1 Temporary Bridge Installation CX(s) Applied: B1.3 Date: 02/07/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007996-categorical-exclusion-determination Download CX-007998: Categorical Exclusion Determination Integration of Stoltze Land and Lumber Biomass Generation CX(s) Applied: B1.7

356

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 30240 of 31,917 results. 31 - 30240 of 31,917 results. Download CX-008709: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Shelton-Fairmount No. 1, 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 05/24/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008709-categorical-exclusion-determination Download CX-008713: Categorical Exclusion Determination 2012 Chemawa District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008713-categorical-exclusion-determination Download CX-008714: Categorical Exclusion Determination Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV),

357

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 31150 of 31,917 results. 41 - 31150 of 31,917 results. Download Audit Report: OAS-L-06-12 Sandia National Laboratories' Safeguards and Security Path Forward Management Plan http://energy.gov/ig/downloads/audit-report-oas-l-06-12 Download CX-010338: Categorical Exclusion Determination Eugene Substation Fiber Interconnection CX(s) Applied: B4.7 Date: 05/21/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010338-categorical-exclusion-determination Download CX-010339: Categorical Exclusion Determination Flight's End Property Funding CX(s) Applied: B1.25 Date: 05/20/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010339-categorical-exclusion-determination Download CX-010346: Categorical Exclusion Determination

358

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

71 - 28280 of 28,904 results. 71 - 28280 of 28,904 results. Download CX-008881: Categorical Exclusion Determination Disposition of Mountain Avenue Tap Line Sectionalizing Switches CX(s) Applied: B1.24 Date: 08/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008881-categorical-exclusion-determination Download CX-008883: Categorical Exclusion Determination Indian Creek Property Funding CX(s) Applied: B1.25 Date: 08/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008883-categorical-exclusion-determination Download GammaCam Technology Demonstration at ORNL Buildings 3026C and 3026D The GammaCam system is an effective tool for remotely identifying high gamma radiation in radioactive environments. Its versatility allows the

359

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

651 - 2660 of 9,640 results. 651 - 2660 of 9,640 results. Download CX-010162: Categorical Exclusion Determination Revenue Meter Replacement at Oregon Trail Electric Co-op's (OTEC's) West John Day Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010162-categorical-exclusion-determination Download CX-010163: Categorical Exclusion Determination Revenue Meter Replacement at Benton County Public Utility District's (PUD) Finley Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010163-categorical-exclusion-determination Download 2Q CY2005 (PDF), Facility Representative Program Performance Indicators Quarterly Report

360

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 11690 of 29,416 results. 81 - 11690 of 29,416 results. Download CX-009198: Categorical Exclusion Determination Ross Transformer Oil Terminal Upgrade CX(s) Applied: B4.6 Date: 09/24/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-009198-categorical-exclusion-determination Download CX-009787: Categorical Exclusion Determination Rogue-Gold Beach No. 2 Disconnect Switch Replacement CX(s) Applied: B4.6 Date: 01/08/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-009787-categorical-exclusion-determination Download CX-010159: Categorical Exclusion Determination Install Rip Rap Along Stream Bank at Two Wood Pole Structures Located Along the Bell-Boundary No. 3 Transmission Line

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 30140 of 31,917 results. 31 - 30140 of 31,917 results. Download CX-010425: Categorical Exclusion Determination Pearl-Keeler Right-of-Way (ROW) Marking Project CX(s) Applied: B1.3 Date: 06/11/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010425-categorical-exclusion-determination Download CX-010427: Categorical Exclusion Determination Hat Rock Switching Station Replacement Project CX(s) Applied: B4.6 Date: 06/17/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010427-categorical-exclusion-determination Download CX-010428: Categorical Exclusion Determination Alvey Substation 115-kilovolt and 230-kV Breaker Replacement Project CX(s) Applied: B4.6 Date: 06/14/2013 Location(s): Oregon

362

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

41 - 4250 of 9,640 results. 41 - 4250 of 9,640 results. Download CX-008708: Categorical Exclusion Determination Wood Pole Structure Replacements on the Chehalis-Olympia No. 1 and Chehalis-Mayfield No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05/25/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008708-categorical-exclusion-determination Download CX-008709: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Shelton-Fairmount No. 1, 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 05/24/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008709-categorical-exclusion-determination Download CX-008714: Categorical Exclusion Determination

363

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 5, 2013 April 5, 2013 CX-010154: Categorical Exclusion Determination Digital Communication System Upgrade Project: 'D' Analog System Retirement and #WC SONET Ring CX(s) Applied: B1.19 Date: 04/05/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 3, 2013 CX-010155: Categorical Exclusion Determination Augspurger Radio Tower Replacement Project CX(s) Applied: B1.19 Date: 04/03/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 3, 2013 CX-010094: Categorical Exclusion Determination Activity-Specific Categorical Exclusion for Deep Borehole Drilling, Sampling, and Characterization for the Proposed Natural Gas Pipeline from Pasco, Washington to the Hanford Site 200 East Area CX(s) Applied: B3.1 Date: 04/03/2013 Location(s): Washington

364

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 - 30670 of 31,917 results. 61 - 30670 of 31,917 results. Download CX-010723: Categorical Exclusion Determination Douglas County Public Utility District (PUD) Fiber Land Use Review Request; Case #20130491 CX(s) Applied: B4.9 Date: 08/19/2013 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010723-categorical-exclusion-determination Download CX-010730: Categorical Exclusion Determination Paisley Geothermal Integration CX(s) Applied: B1.7 Date: 08/09/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010730-categorical-exclusion-determination Download CX-010731: Categorical Exclusion Determination Chief Joseph-Snohomish Rockfall Barrier Fence Construction CX(s) Applied: B1.11 Date: 08/05/2013

365

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

01 - 28710 of 28,904 results. 01 - 28710 of 28,904 results. Download CX-010422: Categorical Exclusion Determination Mt. Richmond Property Funding CX(s) Applied: B1.25 Date: 06/10/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010422-categorical-exclusion-determination Download CX-010438: Categorical Exclusion Determination Chenoweth-Goldendale Number 1 Disconnect Switch Project CX(s) Applied: B4.6 Date: 05/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010438-categorical-exclusion-determination Download TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring Subgroup Radiation Monitoring Subgroup http://energy.gov/em/downloads/tec-working-group-topic-groups-rail-key-documents-radiation-monitoring-subgroup

366

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 - 29170 of 31,917 results. 61 - 29170 of 31,917 results. Page Security and Cyber Evaluations Security and Cyber Evaluations within the Office of Enforcement and Oversight implements the independent security performance monitoring functions for DOE. http://energy.gov/hss/services/oversight/security-and-cyber-evaluations Download CX-009712: Categorical Exclusion Determination Malin Substation Relay Equipment Replacements CX(s) Applied: B1.7 Date: 10/19/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-009712-categorical-exclusion-determination Download CX-009514: Categorical Exclusion Determination Franklin-Badger Canyon and Grandview-Red Mountain Switch Replacements CX(s) Applied: B1.3 Date: 10/18/2012 Location(s): Washington Offices(s): Bonneville Power Administration

367

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 CX-008531: Categorical Exclusion Determination Energize Missouri Homeowners Upgrades and Geothermal Jura CX(s) Applied: B5.19 Date: 05/23/2012 Location(s): Missouri Offices(s): Golden Field Office May 23, 2012 CX-008530: Categorical Exclusion Determination Energize Missouri Homeowners Upgrades and Geothermal Carlson CX(s) Applied: B5.1, B5.19 Date: 05/23/2012 Location(s): Missouri Offices(s): Golden Field Office May 23, 2012 CX-008710: Categorical Exclusion Determination Amendment Number 1 to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 05/23/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration May 23, 2012 CX-008743: Categorical Exclusion Determination Upgrading Lanthanide & Actinide Spectroscopy Capabilities at Washington

368

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8, 2013 8, 2013 CX-010148: Categorical Exclusion Determination Merritt Radio Station Upgrade CX(s) Applied: B1.19 Date: 04/18/2013 Location(s): Washington Offices(s): Bonneville Power Administration April 18, 2013 CX-010319: Categorical Exclusion Determination General Chemical Support Operations for NHS, HP CX(s) Applied: B3.6 Date: 04/18/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office April 18, 2013 CX-010554: Categorical Exclusion Determination Yale University- Power Generation from Waste Heat with Closed Loop Membrane-Based System CX(s) Applied: B3.6 Date: 04/18/2013 Location(s): Connecticut, Colorado Offices(s): Advanced Research Projects Agency-Energy April 17, 2013 CX-010188: Categorical Exclusion Determination Field Demonstration of a Novel Eco-Friendly Production Enhancement Process

369

1996 Wholesale Power and Transmission Rate Schedules.  

Science Conference Proceedings (OSTI)

Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

United States. Bonneville Power Administration.

1996-10-01T23:59:59.000Z

370

Survey of Potential Hanford Site Contaminants in the Upper Sediment for the Reservoirs at McNary, John Day, The Dalles, and Bonneville Dams, 2003  

DOE Green Energy (OSTI)

This report presents the results from a multi-agency cooperative environmental surveillance study. of the study looked at sediment from the pools upstream from dams on the Columbia River that are downstream from Hanford Site operations. The radiological and chemical conditions existing in the upper-level sediment found in the pools upstream from McNary Dam, John Day Dam, The Dalles Lock and Dam, and Bonneville Dam were evaluated. This study also evaluated beach sediment where available. Water samples were collected at McNary Dam to further evaluate potential Hanford contaminants in the lower Columbia River. Samples were analyzed for radionuclides, chemicals, and physical parameters. Results from this study were compared to background values from sediment and water samples collect from the pool upstream of Priest Rapids Dam (upstream of the Hanford Site) by the Hanford Site Surface Environmental Surveillance Project.

Patton, Gregory W.; Priddy, M; Yokel, Jerel W.; Delistraty, Damon A.; Stoops, Thomas M.

2005-02-01T23:59:59.000Z

371

Data Overview for Sensor Fish Samples Acquired at Ice Harbor, John Day, and Bonneville II Dams in 2005, 2006, and 2007  

DOE Green Energy (OSTI)

The purpose of this work was to acquire Sensor Fish data on turbine passage at Bonneville II, John Day, and Ice Harbor dams for later analysis and use. The original data sets have been entered into a database and are being maintained by Pacific Northwest National Laboratory pending delivery to the U.S. Army Corps of Engineers when requested. This report provides documentation for the data sets acquired and details about the operations of the Sensor Fish and interpretation of Sensor Fish data that will be necessary for later use of the acquired data. A limited review of the acquired data was conducted to assess its quality and to extract information that might prove useful to its later use.

Carlson, Thomas J.; Duncan, Joanne P.; Deng, Zhiqun

2008-03-12T23:59:59.000Z

372

Hatchery Evaluation Report / Bonneville Hatchery - Tule Fall Chinook : An Independent Audit Based on Integrated Hatchery Operations Team (IHOT) Performance Measures : Final Report.  

DOE Green Energy (OSTI)

This report presents the findings of the independent audit of the Bonneville Hatchery (Tule Fall Chinook). The hatchery is located on the Columbia River just west of Cascade Locks, Oregon. The hatchery is used for adult collection, egg incubation, and rearing of Tule Fall Chinook and URB Fall Chinook. The audit was conducted in April 1996 as part of a two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the U.S. Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife.

Watson, Montgomery

1996-05-01T23:59:59.000Z

373

Hatchery Evaluation Report / Bonneville Hatchery - Urb Fall Chinook : An Independent Audit Based on Integrated Hatchery Operations Team (IHOT) Performance Measures : Final Report.  

DOE Green Energy (OSTI)

This report presents the findings of the independent audit of the Bonneville Hatchery (Upriver bright [URB] Fall Chinook). The hatchery is located on the Columbia River just west of Cascade Locks, Oregon. The hatchery is used for adult collection, egg incubation, and rearing of Tule Fall Chinook and URB Fall Chinook. The audit was conducted in April 1996 as part of at two-year effort that will include 67 hatcheries and satellite facilities located on the Columbia and Snake River system in Idaho, Oregon, and Washington. The hatchery operating agencies include the U.S. Fish and Wildlife Service, Idaho Department of Fish and Game, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife.

Watson, Montgomery

1996-05-01T23:59:59.000Z

374

CX-009708: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9708: Categorical Exclusion Determination 9708: Categorical Exclusion Determination CX-009708: Categorical Exclusion Determination FY13 Environmental Drainage Upgrades at Bonneville Power Administration's Clatsop, Garrison, Lexington, Mapleton, Ovando, Pearl, and Wren Substations CX(s) Applied: B4.6 Date: 12/03/2012 Location(s): Oregon, Montana, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to upgrade the stormwater drainage systems at the above listed substations in order to bring the associated discharges into compliance with regulatory requirements. Modifications to the stormwater drainage systems will aim to capture oil and sediments before they leave the site. CX-009708.pdf More Documents & Publications CX-009705: Categorical Exclusion Determination

375

CX-007811: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11: Categorical Exclusion Determination 11: Categorical Exclusion Determination CX-007811: Categorical Exclusion Determination "Decommission Ground Water Monitoring Well Located on Bonneville Power Administration (BPA) Fee-owned Property CX(s) Applied: B3.1 Date: 12/14/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to allow Seattle City Light access to a BPA fee-owned right-of-way (ROW) for the purpose of decommissioning a Seattle City Lightowned well. Seattle City Light historically installed ground water monitoring wells as part of the Boundary Dam licensing process in the 1950s and 1960s to study the impact of the Dam on ground water levels. One of these wells exists on BPA fee-owned ROW approximately 650 feet ahead-on-line from tower 107/1 [Ref

376

Energy Storage for Power Systems Applications: A Regional Assessment for the Northwest Power Pool (NWPP)  

DOE Green Energy (OSTI)

Wind production, which has expanded rapidly in recent years, could be an important element in the future efficient management of the electric power system; however, wind energy generation is uncontrollable and intermittent in nature. Thus, while wind power represents a significant opportunity to the Bonneville Power Administration (BPA), integrating high levels of wind resources into the power system will bring great challenges to generation scheduling and in the provision of ancillary services. This report addresses several key questions in the broader discussion on the integration of renewable energy resources in the Pacific Northwest power grid. More specifically, it addresses the following questions: a) how much total reserve or balancing requirements are necessary to accommodate the simulated expansion of intermittent renewable energy resources during the 2019 time horizon, and b) what are the most cost effective technological solutions for meeting load balancing requirements in the Northwest Power Pool (NWPP).

Kintner-Meyer, Michael CW; Balducci, Patrick J.; Jin, Chunlian; Nguyen, Tony B.; Elizondo, Marcelo A.; Viswanathan, Vilayanur V.; Guo, Xinxin; Tuffner, Francis K.

2010-04-01T23:59:59.000Z

377

Annual Report to the Bonneville Power Administration, Reporting Period: April 2008 - February 2009 [re: "Survival and Growth in the Columbia River Plume and north California Current"].  

DOE Green Energy (OSTI)

We have made substantial progress toward our objectives outlined in our BPA supported proposal entitled 'Columbia River Basin Juvenile Salmonids: Survival and Growth in the Columbia River Plume and northern California Current' which we report on herein. During 2008, we were able to successfully conduct 3 mesoscale cruises. We also were able to conduct 7 biweekly predator cruises, along with substantial shore-based visual observations of seabirds. Detailed results of the mesoscale cruises are available in the Cruise Reports and summarized in the next section. We have taken a proactive approach to getting the results of our research to fisheries managers and the general public. We have begun to make annual predictions based on ocean conditions of the relative survival of juvenile coho and Chinook salmon well before they return as adults. This is based on both biological and physical indicators that we measure during our surveys or collect from outside data sources. Examples of our predictions for 2009 and 2010 are available on the following web site: http://www.nwfsc.noaa.gov/research/divisions/fed/oeip/a-ecinhome.cfm.

Northwest Fisheries Science Center, NOAA Fisheries; Cooperative Institute for Marine Resources Studies, Oregon State University; OGI School of Science & Engineering, Oregon Health Sciences University.

2009-07-17T23:59:59.000Z

378

Columbia River System Operation Review on Selecting an Operating Strategy for the Federal Columbia River Power System; 21Feb1997  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY Bonneville Power Administration Columbia River System Operation Review on Selecting an Operating Strategy for the Federal Columbia River Power System (FCRPS) AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE) ACTION: Record of Decision (ROD) SUMMARY: The Columbia River System Operation Review (SOR) Environmental Impact Statement (EIS) assessed operations at the 14 Federal dams and reservoirs on the Columbia and lower Snake Rivers that have a major influence on the multiple purpose system operation, and for which power production is coordinated under the Pacific Northwest Coordination Agreement. Lead agencies for this six-year process were the U.S. Army Corps of Engineers (Corps), the U.S. Bureau of Reclamation

379

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7, 2012 7, 2012 CX-008208: Categorical Exclusion Determination Renewable Energy and Energy Efficiency Revolving Loan Program - Andreola Farms, Incorporated CX(s) Applied: B5.18 Date: 03/27/2012 Location(s): Nevada Offices(s): Golden Field Office March 26, 2012 CX-008164: Categorical Exclusion Determination Captain Jack-Olinda RAS LLL/LT Replacement Project CX(s) Applied: B1.31 Date: 03/26/2012 Location(s): California Offices(s): Bonneville Power Administration March 26, 2012 CX-008207: Categorical Exclusion Determination Field Evaluation and Validation of Remote Wind Sensing Technologies - Shore-Based and Buoy Mounted Light LIDAR Systems CX(s) Applied: A9, A11, B3.1, B3.16 Date: 03/26/2012 Location(s): New Jersey Offices(s): Golden Field Office March 26, 2012 CX-008206: Categorical Exclusion Determination

380

Categorical Exclusion Determinations: B1.3 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 31, 2013 July 31, 2013 CX-010843: Categorical Exclusion Determination Subcontractor Repair of Roof Leak in Rm. F45 at 703-1B CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 31, 2013 CX-010732: Categorical Exclusion Determination 2013 Spokane District Wood pole Replacement Projects CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): Washington, Washington, Washington, Washington, Idaho Offices(s): Bonneville Power Administration July 31, 2013 CX-010840: Categorical Exclusion Determination Place Old A-Cell Block Crane in Sealand Container for Disposal CX(s) Applied: B1.3 Date: 07/31/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 31, 2013 CX-010884: Categorical Exclusion Determination

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3, 2012 3, 2012 CX-008950: Categorical Exclusion Determination Pilot Testing: Pretreatment Options to Allow Re-Use of Frac Flowback Water CX(s) Applied: B3.6 Date: 08/13/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory August 13, 2012 CX-008949: Categorical Exclusion Determination Novel Materials for Robust Repair of Leaky Wellbores in Carbon Dioxide Storage Formations CX(s) Applied: A9, B3.6 Date: 08/13/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory August 13, 2012 CX-008884: Categorical Exclusion Determination Rattlesnake Butte Property Funding CX(s) Applied: B1.25 Date: 08/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration August 13, 2012 CX-008879: Categorical Exclusion Determination Pearl-Marion No.1 Line Tower 21/1 Bank Repair Project

382

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2012 2, 2012 CX-007998: Categorical Exclusion Determination Integration of Stoltze Land and Lumber Biomass Generation CX(s) Applied: B1.7 Date: 02/02/2012 Location(s): Montana Offices(s): Bonneville Power Administration February 1, 2012 CX-007813: Categorical Exclusion Determination Bayou Choctaw Building 401 Air Handling Unit-3 Heating, Ventilation and Air Conditioning Replacement CX(s) Applied: B1.4 Date: 02/01/2012 Location(s): Louisiana Offices(s): Strategic Petroleum Reserve Field Office February 1, 2012 CX-007952: Categorical Exclusion Determination Esperanza Roof Replacement CX(s) Applied: A1, B2.1, B5.1 Date: 02/01/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory February 1, 2012 CX-007951: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project

383

Categorical Exclusion Determinations: Idaho | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 28, 2011 November 28, 2011 CX-007772: Categorical Exclusion Determination Idaho National Laboratory Asphalt Repair Project - North Wind Services, LLC CX(s) Applied: B1.3 Date: 11/28/2011 Location(s): Idaho Offices(s): Nuclear Energy, Idaho Operations Office November 22, 2011 CX-007370: Categorical Exclusion Determination Idaho-TRIBE-SHOSHONE-BANNOCK TRIBE OF THE FORT HALL RESERVATION OF IDAHO CX(s) Applied: B2.5, B5.1 Date: 11/22/2011 Location(s): Idaho Offices(s): Energy Efficiency and Renewable Energy November 17, 2011 CX-007364: Categorical Exclusion Determination Provision of Funds to the Kootenai Tribe of Idaho to Purchase the Upper Twin Rivers Conservation Easement CX(s) Applied: B1.25 Date: 11/17/2011 Location(s): Idaho Offices(s): Bonneville Power Administration November 15, 2011

384

Categorical Exclusion Determinations: Oregon | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 1, 2012 August 1, 2012 CX-008976: Categorical Exclusion Determination Clean Start - Development of a National Liquid Propane (Autogas) Refueling Network CX(s) Applied: B5.22 Date: 08/01/2012 Location(s): Arizona, Colorado, Oregon, Texas, Washington Offices(s): National Energy Technology Laboratory July 30, 2012 CX-008891: Categorical Exclusion Determination Pilot Butte-La Pine No. 1 Wood Pole Replacement Project CX(s) Applied: B4.6 Date: 07/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration July 25, 2012 CX-008873: Categorical Exclusion Determination Oregon State University- Natural Gas Self-contained Home Filling Station CX(s) Applied: B3.6 Date: 07/25/2012 Location(s): Oregon, Colorado, Michigan Offices(s): Advanced Research Projects Agency-Energy

385

Categorical Exclusion Determinations: Idaho | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

December 19, 2012 December 19, 2012 CX-009703: Categorical Exclusion Determination Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line CX(s) Applied: B1.3, B1.13 Date: 12/19/2012 Location(s): Washington, Idaho Offices(s): Bonneville Power Administration December 17, 2012 CX-009790: Categorical Exclusion Determination National Oceanic and Atmospheric Administration (NOAA) Birch Creek Canyon Wind Study CX(s) Applied: B3.1 Date: 12/17/2012 Location(s): Idaho Offices(s): Idaho Operations Office December 15, 2012 CX-009635: Categorical Exclusion Determination INTEC - U-233 Waste Stream Disposition CX(s) Applied: NO CX GIVEN Date: 12/15/2012 Location(s): Idaho Offices(s): Idaho Operations Office December 5, 2012 CX-009634: Categorical Exclusion Determination

386

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 16, 2013 July 16, 2013 CX-010858: Categorical Exclusion Determination Demolition of the 745-N Excess Equipment Pad CX(s) Applied: B1.23 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 16, 2013 CX-010857: Categorical Exclusion Determination Replace 735-A South Header Ductwork Located on D-wing Service Floor CX(s) Applied: B2.3 Date: 07/16/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office July 15, 2013 CX-010738: Categorical Exclusion Determination 2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration July 15, 2013 CX-010717: Categorical Exclusion Determination

387

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5, 2012 5, 2012 CX-009207: Categorical Exclusion Determination Provision of Funds to Confederated Salish and Kootenai Tribes CX(s) Applied: B1.25 Date: 09/05/2012 Location(s): Montana Offices(s): Bonneville Power Administration September 5, 2012 CX-009189: Categorical Exclusion Determination (0675-1594) Eaton Corporation - Predictive Battery Management for Commercial Hybrid Vehicles CX(s) Applied: B3.6 Date: 09/05/2012 Location(s): Michigan, Minnesota, Colorado Offices(s): Advanced Research Projects Agency-Energy September 5, 2012 CX-009139: Categorical Exclusion Determination Energy Efficiency and Conservation Block Grant Program CX(s) Applied: B5.23 Date: 09/05/2012 Location(s): Arizona Offices(s): Golden Field Office September 5, 2012 CX-009187: Categorical Exclusion Determination

388

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2013 0, 2013 CX-010422: Categorical Exclusion Determination Mt. Richmond Property Funding CX(s) Applied: B1.25 Date: 06/10/2013 Location(s): Oregon Offices(s): Bonneville Power Administration June 8, 2013 CX-010456: Categorical Exclusion Determination Trident: A Human Factors Decision Aid Integrating Deepwater Drilling Tasks, Incidents, and Literature CX(s) Applied: A9, A11 Date: 06/08/2013 Location(s): California Offices(s): National Energy Technology Laboratory June 8, 2013 CX-010454: Categorical Exclusion Determination Trident: A Human Factors Decision Aid Integrating Deepwater Drilling Tasks, Incidents, and Literature CX(s) Applied: A9, A11 Date: 06/08/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory June 7, 2013 CX-010670: Categorical Exclusion Determination

389

Categorical Exclusion Determinations: B1.24 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 8, 2012 August 8, 2012 CX-008881: Categorical Exclusion Determination Disposition of Mountain Avenue Tap Line Sectionalizing Switches CX(s) Applied: B1.24 Date: 08/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration August 8, 2012 CX-008961: Categorical Exclusion Determination Pittsburgh Guard Shack Replacement CX(s) Applied: B1.23, B1.24 Date: 08/08/2012 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory July 18, 2012 CX-009092: Categorical Exclusion Determination Project 1769 - Relocate NC-135 Site Operations CX(s) Applied: B1.24, B1.31 Date: 07/18/2012 Location(s): Missouri Offices(s): Kansas City Site Office July 13, 2012 CX-008762: Categorical Exclusion Determination Acid Pond Property Disposition Near the Spook, Wyoming, Disposal Site

390

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9, 2012 9, 2012 CX-008000: Categorical Exclusion Determination Crystal Chemistry of Toxic Metal Sequestration CX(s) Applied: B3.6 Date: 02/09/2012 Location(s): Illinois Offices(s): Science, Chicago Office February 9, 2012 CX-007993: Categorical Exclusion Determination Hatwai 230-Kilovolt Substation Breaker Replacement CX(s) Applied: B4.6 Date: 02/09/2012 Location(s): Idaho Offices(s): Bonneville Power Administration February 9, 2012 CX-007946: Categorical Exclusion Determination Midwest Region Alternative Fuels Project CX(s) Applied: B2.3, B5.1 Date: 02/09/2012 Location(s): Kansas Offices(s): National Energy Technology Laboratory February 8, 2012 CX-007887: Categorical Exclusion Determination Beyond the Solar City: Building on Pittsburgh's Successes to Put Southwestern Pennsylvania on the Solar Map

391

Characterization of Gatewell Orifice Lighting at the Bonneville Dam Second Powerhouse and Compendium of Research on Light Guidance with Juvenile Salmonids  

DOE Green Energy (OSTI)

The goal of the study described in this report is to provide U.S. Army Corps of Engineers (USACE) biologists and engineers with general design guidelines for using artificial lighting to enhance the passage of juvenile salmonids into the collection channel at the Bonneville Dam second powerhouse (B2). During fall 2007, Pacific Northwest National Laboratory (PNNL) researchers measured light levels in the field at one powerhouse orifice through which fish must pass to reach the collection channel. Two light types were evaluatedlight-emitting diode (LED) lights and halogen spot lights. Additional measurements with mercury lamps were made at the PNNL Aquatic Research Laboratory to determine baseline intensity of the current lighting. A separate chapter synthesizes the relevant literature related to light and fish guidance for both field and laboratory studies. PNNL will also review the Corps plans for existing lighting protocol at all of the Portland District projects and help develop a uniform lighting scheme which could be implemented. The specific objectives for this study are to 1. Create a synthesis report of existing lighting data for juvenile salmonid attraction and deterrence and how the data are used at fish bypass facilities. 2. Evaluate current B2 orifice lighting conditions with both LED and halogen sources. 3. Make recommendations as to what lighting intensity, source, and configuration would improve passage at the B2 orifices. 4. Review USACE plans for retrofit of existing systems (to be assessed at a later date).

Mueller, Robert P.; Simmons, Mary Ann

2007-12-29T23:59:59.000Z

392

Temperature and Water Depth Monitoring Within Chum Salmon Spawning Habitat Below Bonneville Dam : Annual Report October 2007-September 2008  

DOE Green Energy (OSTI)

The overall goal of the project described in this report is to provide a sound scientific basis for operation of the Federal Columbia River Power System (FCRPS) in ways that will effectively protect and enhance chum salmon populations - a species listed in March 1999 as threatened under the Endangered Species Act of 1973 (ESA). The study objective during fiscal year 2008 was to provide real-time data on Ives Island area water temperature and water surface elevations from the onset of chum salmon spawning through the end of chum salmon emergence. Sampling locations included areas where riverbed temperatures were elevated, potentially influencing alevin development and emergence timing. In these locations, hydrosystem operation caused large, frequent changes in river discharge that affected salmon habitat by dewatering redds and altering egg pocket temperatures. The 2008 objective was accomplished using temperature and water-level sensors deployed inside piezometers. Sensors were integrated with a radio telemetry system such that real-time data could be downloaded remotely and posted hourly on the Internet. During our overall monitoring period (October 2007 through June 2008), mean temperature in chum spawning areas was nearly 2 C warmer within the riverbed than in the overlying river. During chum salmon spawning (mid-November 2007 through December2007), mean riverbed temperature in the Ives Island area was 14.5 C, more than 5 C higher than in the river, where mean temperature was 9.4 C. During the incubation period (January 2008 through mid-May 2008), riverbed temperature was approximately 3 C greater than in the overlying river (10.5 C and 7.2 C, respectively). Chum salmon preferentially select spawning locations where riverbed temperatures are elevated; consequently the incubation time of alevin is shortened before they emerge in the spring.

Arntzen, E.V. [Pacific Northwest National Laboratory

2009-07-14T23:59:59.000Z

393

Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project Resource Contingency Program - Oregon. Final Environmental Statement Hermiston Power Project file:///I|/Data%20Migration%20Task/EIS-0230-FEIS-1995/01_EIS0230_rcp.html[6/27/2011 1:26:50 PM] Resource Contingency Program-Oregon Final Environmental Impact Statement Hermiston Power Project Introduction The Bonneville Power Administration (BPA) has statutory responsibilities to supply electrical power to its utility, industrial, and other customers in the Pacific Northwest. In 1990, to cover the outer range of potential load growth with new resources, BPA embarked upon the Resource Contingency Program (RCP). Instead of buying or building generating plants now, BPA has purchased options to acquire power later, if and when it is needed. The decision to acquire any of these option energy projects to fulfill statutory supply obligations will be influenced by

394

Lakeview Light and Power - Commercial Lighting Rebate Program | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lakeview Light and Power - Commercial Lighting Rebate Program Lakeview Light and Power - Commercial Lighting Rebate Program Lakeview Light and Power - Commercial Lighting Rebate Program < Back Eligibility Commercial Fed. Government Local Government Nonprofit State Government Savings Category Appliances & Electronics Commercial Lighting Lighting Program Info Funding Source Funded by Bonneville Power Administration Expiration Date 9/1/2013 State District of Columbia Program Type Utility Rebate Program Rebate Amount Commercial Lighting Installation: Up to 70% of cost Provider Lakeview Light and Power Lakeview Light and Power offers a commercial lighting rebate program. Rebates apply to the installation of energy efficient lighting retrofits in non-residential buildings. The rebate program is funded by BPA and ends in September of 2010 or earlier if the funding is exhausted. Lakeview Light

395

CX-007748: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

48: Categorical Exclusion Determination 48: Categorical Exclusion Determination CX-007748: Categorical Exclusion Determination Integration of the Farm Power Misty Meadows Generating Facility CX(s) Applied: B1.7 Date: 01/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration In response to Farm Power Misty Meadow's (Farm Power's) small generator interconnection request, Bonneville Power Administration (BPA) is planning to integrate their 1-megawatt biomass generation project into its balancing authority (BA). The proposed point of interconnection is Tillamook Peoples Utility District's (PUD) Feeder Circuit #63, which is connected to the Tillamook PUD's Wilson River Substation. In order to integrate the proposed generation, BPA would provide Farm Power with parts for installing a standard BPA JEMSTAR revenue meter, along with example design drawings.

396

Outfall Site and Type Selection for a New Surface Flow Outlet to Pass Juvenile Fish at Bonneville Dams Second Powerhouse, Columbia River  

DOE Green Energy (OSTI)

A site near the downstream tip of Cascades Island and a mid-level cantilever outfall type were selected for the high flow outfall of the new surface flow juvenile fish bypass at Bonneville Dams Second Powerhouse. The new bypass will be a modification of the existing ice and trash sluice chute, which discharges into the tailrace with jet impact on the bottom near a shoreline that predators inhabit. Thus, a new site and type are necessary for this high flow (> 28.3 m3/s) outfall. Technical guidelines on high flow outfall location and design were established and applied during the outfall development process. Critical design parameters included discharge at 150 m3/s, entry velocities approaching 15.2 m/s, and tailwater elevation range of 6.1 m. For outfall siting, the selection process began with identification of nine initial alternatives. Screening, evaluation, and selection stages narrowed the list to two sites Range D 121.9 m straight downstream from the existing outfall and Range F 760 m downstream near the tip of Cascades Island. For outfall type, the selection process was initiated with conceptualization of 13 alternatives. During successive screening, evaluation, consolidation, and selection stages, professional judgment and quantitative comparisons were used to select two finalists Adjustable Cantilever and Mid-Level Cantilever. The four combinations of outfall site/type were evaluated in 1:30 and 1:100 scale physical hydraulic models. The process resulted in selection of a mid-level cantilever with plunge pool at the tip of Cascades Island. The system is scheduled for completion in March 2004.

Johnson, Gary E.; Ebberts, Blaine; Giorgi, Albert E.; Kuhn, Karen; Lee, Randy; Plump, John H.; Stensby, David A.; Sweeney, Charles E.

2008-08-01T23:59:59.000Z

397

Wallula Power Project and Wallula - McNary Transmission Line Project, Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final EIS Appendix A: Revised Mitigation Measures Final EIS Appendix A: Revised Mitigation Measures August 2002 Page A-1 Appendix A Revised Mitigation Measures The proposed project includes measures that would limit construction and operation impacts to elements of the natural and human environment. These measures are presented for each element of the environment identified as a potential concern by Bonneville and EFSEC based on preliminary environmental review and public and regulatory agency input. Updates to the mitigation table below are in response to comments on the Draft EIS or to incorporate new information included in the Settlement Agreements. Mitigation Measure Power Plant Pipelines Bonneville T-Line EARTH Seismicity Facilities would be designed to meet regional seismic design criteria as presented in the Uniform Building Code (UBC). X X

398

CX-007354: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7354: Categorical Exclusion Determination 7354: Categorical Exclusion Determination CX-007354: Categorical Exclusion Determination Integration of the Farm Power Tillamook Generating Facility CX(s) Applied: B1.7 Date: 12/02/2011 Location(s): Oregon Offices(s): Bonneville Power Administration In response to Farm Power Tillamook's small generator interconnection request, Bonneville Power Administration (BPA) is planning to integrate their 0.995-megawatt biomass generation project into its balancing authority (BA). The proposed point of interconnection is at the Wilson River Substation owned by Tillamook Public Utility District. In order to integrate the proposed generation, BPA would install, test, calibrate, and energize a BPA JEMSTAR meter for revenue metering at Farm Power Tillamook's generation site. The meter and associated equipment would be

399

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 9560 of 29,416 results. 51 - 9560 of 29,416 results. Download CX-009031: Categorical Exclusion Determination Innovative Manufacturing Process for Improving the Erosion/Corrosion Resistance of Power Plant Components via Powder Metallurgy & Hot Isostatic Processing Methods - Electric Power Research Institute CX(s) Applied: B3.6 Date: 08/20/2012 Location(s): CX: none Offices(s): Nuclear Energy http://energy.gov/nepa/downloads/cx-009031-categorical-exclusion-determination Download CX-009698: Categorical Exclusion Determination Sale of Lakeside Radio Station CX(s) Applied: B1.24 Date: 12/27/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-009698-categorical-exclusion-determination-0 Download FY 2014 Scientific Infrastructure Support for Consolidated

400

Power Marketing Administrations Poised to Make Another Big Contribution to  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Marketing Administrations Poised to Make Another Big Marketing Administrations Poised to Make Another Big Contribution to America's Progress Power Marketing Administrations Poised to Make Another Big Contribution to America's Progress March 16, 2012 - 9:00am Addthis Lauren Azar Senior Advisor to Secretary Chu Most Americans have never heard of the Department of Energy's Power Marketing Administrations (PMAs), but these four organizations are a crucial part of the country's electricity infrastructure - past, present and future. Starting with the Bonneville Power Administration in 1937, Congress established the Power Marketing Administrations to distribute and sell electricity from a network of more than 130 federally built hydroelectric dams, including the Hoover Dam, the Columbia River dams, and others throughout the United States. While the PMAs -- which also include the

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Microsoft Word - FarmPowerMistyMeadows_CX_2012.docx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0, 2012 0, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum James Hall Project Manager - TPC-TPP-4 Proposed Action: Integration of the Farm Power Misty Meadows Generating Facility Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 - Electric equipment Location: Tillamook County, Oregon Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: In response to Farm Power Misty Meadow's (Farm Power's) small generator interconnection request, BPA is planning to integrate their 1-MW biomass generation project into its balancing authority (BA). The proposed point of interconnection is Tillamook PUD's Feeder Circuit #63, which is connected to the Tillamook PUD's Wilson River Substation. In order to integrate the

402

Design and Analysis of Salmonid Tagging Studies in the Columbia Basin, Volume XV; Appraisal of the Relationship between Tag Detection Efficiency at Bonneville Dam and the Precision of In-River Survival Estimates of Returning PIT-Tagged Chinook Salmon, 2000 Technical Report.  

DOE Green Energy (OSTI)

In the advent of the installation of a PIT-tag interrogation system in the Cascades Island fish ladder at Bonneville Dam, this report provides guidance on the anticipated precision of in-river survival estimates for returning adult salmonids, between Bonneville and Lower Granite dams, for various levels of system-wide adult detection probability at Bonneville Dam. Precision was characterized by the standard error of the survival estimates and the coefficient of variation of the survival estimates. The anticipated precision of in-river survival estimates for returning adult salmonids was directly proportional to the number of PIT-tagged smolts released and to the system-wide adult detection efficiency at Bonneville Dam, as well as to the in-river juvenile survival above Lower Granite Dam. Moreover, for a given release size and system-wide adult detection efficiency at Bonneville Dam, higher estuarine and marine survival rates also produced more precise survival estimates. With a system-wide detection probability of P{sub BA} = 1 at Bonneville Dam, the anticipated CVs for in-river survival estimate ranged between 9.4 and 20% with release sizes of 10,000 smolts. Moreover, if the system-wide adult detection efficiency at Bonneville Dam is less than maximum (i.e., P{sub BA} < 1), precision of CV {le} 20% could still be attained. For example, for releases of 10,000 PIT-tagged fish a CV of 20% in the estimates of in-river survival for returning adult salmon could be reach with system-wide detection probabilities of 0.2 {le} P{sub BA} {le} 0.6, depending on the tagging scenario.

Perez-Comas, Joes A.; Skalski, John R. (University of Washington, School of Fisheries, Seattle, WA)

2000-07-01T23:59:59.000Z

403

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 28660 of 28,904 results. 51 - 28660 of 28,904 results. Download EAC Recommendations for DOE Action Regarding a Strategic Portable Generation Reserve- October 17, 2012 EAC Recommendations for DOE Action Regarding a Strategic Portable Generation Reserve, approved at the October 15-16, 2012 EAC Meeting. http://energy.gov/oe/downloads/eac-recommendations-doe-action-regarding-strategic-portable-generation-reserve-october Download CX-008716: Categorical Exclusion Determination Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008716-categorical-exclusion-determination

404

CX-007366: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7366: Categorical Exclusion Determination 7366: Categorical Exclusion Determination CX-007366: Categorical Exclusion Determination Inland Power & Light 230-kilovolt Substation Project CX(s) Applied: B4.6 Date: 11/17/2011 Location(s): Washington Offices(s): Bonneville Power Administration To provide a tap point for IP&L, Bonneville Power Administration (BPA) would do the following: 1. Install two new 35-foot tall disconnect switch structures under the BPA Bell-Boundary line located about 50 feet south of tower 5/2 and 50 feet north of tower 5/5. Construction of each lattice-steel, disconnect switch structure would require four holes 6-8 feet deep in a rectangular pattern 34 feet wide (to match the lines above) by 10 feet, and would be located on BPA Right-of-Way (ROW) underneath the existing transmission line. 2. BPA may need to construct a new wood pole

405

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 7, 2011 July 7, 2011 CX-006111: Categorical Exclusion Determination Washington-Tribe-Stillaguamish Tribe of Indians CX(s) Applied: A1, A9, B2.5, B5.1 Date: 07/07/2011 Location(s): Washington Office(s): Energy Efficiency and Renewable Energy July 7, 2011 CX-006262: Categorical Exclusion Determination Central Ferry Fiber Project CX(s) Applied: B1.7, B4.7 Date: 07/07/2011 Location(s): Walla Walla County, Washington Office(s): Bonneville Power Administration July 2, 2011 CX-008688: Categorical Exclusion Determination Installation of equipment at Wahkiakum Public Utility District's Cathlamet Substation CX(s) Applied: B4.6 Date: 07/02/2011 Location(s): Washington Offices(s): Bonneville Power Administration June 30, 2011 CX-008011: Categorical Exclusion Determination Install EMSL Super-Computer Power Infrastructure

406

Categorical Exclusion (CX) Determinations By Date | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 13, 2013 March 13, 2013 CX-010162: Categorical Exclusion Determination Revenue Meter Replacement at Oregon Trail Electric Co-op's (OTEC's) West John Day Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Oregon Offices(s): Bonneville Power Administration March 12, 2013 CX-010558: Categorical Exclusion Determination University of California Santa Cruz- Adiabatic Waveguide Coupler for High-Power Solar Energy Collection, Photovoltaic Conversion and Transmission CX(s) Applied: B3.6 Date: 03/12/2013 Location(s): California, California, California, California, Colorado Offices(s): Advanced Research Projects Agency-Energy March 12, 2013 CX-010132: Categorical Exclusion Determination 235-F Risk Reduction and Deactivation CX(s) Applied: B1.28 Date: 03/12/2013 Location(s): South Carolina

407

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

31 - 25040 of 28,560 results. 31 - 25040 of 28,560 results. Download CX-007444: Categorical Exclusion Determination Idaho National Laboratory (INL) Support to Analysis and Measurement Systems Corporation (AMS) for Performance Monitoring Technology Deployment at the Advanced Test Reactor (ATR) on the INL CX(s) Applied: B3.6 Date: 11/15/2011 Location(s): Idaho Offices(s): Idaho Operations Office http://energy.gov/nepa/downloads/cx-007444-categorical-exclusion-determination Download CX-007748: Categorical Exclusion Determination Integration of the Farm Power Misty Meadows Generating Facility CX(s) Applied: B1.7 Date: 01/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007748-categorical-exclusion-determination Download CX-007779: Categorical Exclusion Determination

408

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

71 - 31480 of 31,917 results. 71 - 31480 of 31,917 results. Download CX-010590: Categorical Exclusion Determination Kalispell Shunt Cap Addition Project CX(s) Applied: B4.11 Date: 07/01/2013 Location(s): Montana Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010590-categorical-exclusion-determination Download CX-010684: Categorical Exclusion Determination Cottonwood-Roseville Optical Groundwire Project CX(s) Applied: B4.6, B4.7, B4.11, B4.13 Date: 07/03/2013 Location(s): California Offices(s): Western Area Power Administration-Sierra Nevada Region http://energy.gov/nepa/downloads/cx-010684-categorical-exclusion-determination Download CX-010580: Categorical Exclusion Determination McNary Substation Shunt Capacitor Addition CX(s) Applied: B4.6 Date: 07/17/2013

409

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

91 - 24800 of 26,764 results. 91 - 24800 of 26,764 results. Download CX-007430: Categorical Exclusion Determination Innovative Computational Tools for Reducing Exploration Risk Through Integration of Water-rock Interactions and Magnetotelluric Surveys CX(s) Applied: A9, B3.6 Date: 12/01/2011 Location(s): Utah Offices(s): Golden Field Office http://energy.gov/nepa/downloads/cx-007430-categorical-exclusion-determination Download CX-007748: Categorical Exclusion Determination Integration of the Farm Power Misty Meadows Generating Facility CX(s) Applied: B1.7 Date: 01/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007748-categorical-exclusion-determination Download CX-007862: Categorical Exclusion Determination Northeast Photovoltaic Regional Training Provider

410

Socioeconomic effects of power marketing alternatives for the Central Valley and Washoe Projects: 2005 regional econmic impact analysis using IMPLAN  

DOE Green Energy (OSTI)

The Western Area Power Administration (Western) was founded by the Department of Energy Organization Act of 1977 to market and transmit federal hydroelectric power in 15 western states outside the Pacific Northwest, which is served by the Bonneville Power Administration. Western is divided into four independent Customer Service Regions including the Sierra Nevada Region (Sierra Nevada), the focus of this report. The Central Valley Project (CVP) and the Washoe Project provide the primary power resources marketed by Sierra Nevada. Sierra Nevada also purchases and markets power generated by the Bonneville Power Administration, Pacific Gas and Electric (PG&E), and various power pools. Sierra Nevada currently markets approximately 1,480 megawatts of power to 77 customers in northern and central California. These customers include investor-owned utilities, public utilities, government agencies, military bases, and irrigation districts. Methods and conclusions from an economic analysis are summarized concerning distributional effects of alternative actions that Sierra Nevada could take with it`s new marketing plan.

Anderson, D.M.; Godoy-Kain, P.; Gu, A.Y.; Ulibarri, C.A.

1996-11-01T23:59:59.000Z

411

Superconducting magnetic energy storage for electric power system dynamic stabilization  

DOE Green Energy (OSTI)

A Superconducting Magnetic Energy Storage (SMES) system is being developed at the Los Alamos Scientific Laboratory (LASL) for a dynamic stabilizer to be installed in the Bonneville Power Administration (BPA) power system at Tacoma, Washington, by 1982. This unit will be an alternate stabilization method to the dc modulator now used to stabilize the 900 mile, ac intertie between BPA and Southern California. The generation control systems' response to the constantly occuring, small-load and voltage changes can result in negatively damped, low-frequency power oscillations. The dc modulator provides stabilization by fast load control of the High-Voltage dc (HVDC). The SMES unit consists of a 30-MJ solenoid, a 10 MW convertor, a liquid helium dewar and auxiliary systems which operate independent of the HVDC system. The SMES dynamic stabilizer design is presented with status information about the superconducting coil, the converter and other components of the SMES dynamic stabilizer summarized.

Turner, R.

1979-01-01T23:59:59.000Z

412

Superconducting Magnetic Energy Storage for electric power system dynamic stabilization  

DOE Green Energy (OSTI)

A Superconducting Magnetic Energy Storage (SMES) system is being developed at the Los Alamos Scientific Laboratory (LASL) for a dynamic stabilizer to be installed in the Bonneville Power Administration (BPA) power system at Tacoma, Washington, by 1982. This unit will be an alternate stabilization method to the dc modulator now used to stabilize the 900 mile, ac intertie between BPA and Southern California. The generation control systems' response to the constantly occurring, small-load and voltage changes can result in negatively damped, low-frequency power oscillations. The dc modulator provides stabilization by fast load control of the High-Voltage dc (HVDC). The SMES unit consists of a 30-MJ solenoid, a 10-MW convertor, a liquid helium dewar, and auxiliary systems which operate independent of the HVDC system. The SMES dynamic stabilizer design is presented and status information is given about the superconducting coil, the converter, and other components of the SMES dynamic stabilizer.

Turner, R.D.

1979-01-01T23:59:59.000Z

413

PacifiCorp Capacity Power Sale Contract Final Environmental Impact Statement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement Statement file:///I|/Data%20Migration%20Task/EIS-0171-FEIS-Summary-1994.htm[6/27/2011 10:42:49 AM] Summary PacifiCorp Capacity Sale Final Environmental Impact Statement (EIS) Purpose of and Need for the Action The Bonneville Power Administration (BPA) must respond to the need for power as represented by PacifiCorp's request for a continued supply of firm capacity. BPA has surplus electrical capacity (peakload energy) that BPA projects will not be required to meet its existing obligations. Such obligations include those to meet the loads of firm power customers, pursuant to the Pacific Northwest Electric Power Planning and Conservation Act (Northwest Power Act), and previously committed capacity contracts. BPA is authorized under the Northwest Power Act to sell system capacity and/or energy that is surplus to its needs,

414

CX-007359: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

359: Categorical Exclusion Determination 359: Categorical Exclusion Determination CX-007359: Categorical Exclusion Determination McNary-Horse Heaven 230-kilovolt Transmission Line Raise (Structures 15/2 to 16/3) CX(s) Applied: B1.3 Date: 12/01/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to add six wooden prop structures to the McNary-Horse Heaven No. 1 230-kilovolt transmission line between structures 15/2-16/3. The prop structures are needed to raise the existing line so that the conductor meets the necessary Minimum Approach Distance from the orchard below. An augur truck would use existing BPA roads to access the site and install wooden poles. More Documents & Publications CX-006582: Categorical Exclusion Determination

415

CX-010734: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace existing culverts at 12 access road stream crossings that present barriers to fish passage. These improvements will be made on BPA easement access roads within Department of Natural Resources (DNR) owned and managed lands. BPA will make these improvements by installing new fish friendly culverts and/or bridges at each stream crossing. CX-010734.pdf More Documents & Publications CX-008890: Categorical Exclusion Determination CX-010432: Categorical Exclusion Determination

416

CX-009704: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04: Categorical Exclusion Determination 04: Categorical Exclusion Determination CX-009704: Categorical Exclusion Determination Pasco Land Acquisition CX(s) Applied: B1.24 Date: 12/17/2012 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to purchase 19.38 acres of land in Pasco, Washington. The property is located just north/north-west of the intersection of Commercial Avenue and Garland Street. The zoning for this parcel is I-1, or Light Industrial. If BPA decides to develop the property, a separate environmental review will be conducted as needed. The purchase itself would have no effect on the environment. CX-009704.pdf More Documents & Publications CX-010436: Categorical Exclusion Determination CX-010154: Categorical Exclusion Determination

417

CX-007750: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-007750: Categorical Exclusion Determination "Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a multiple use request submitted by the City of Longview, Washington, to construct a paved recreational trail (the Highland Trail) for pedestrian and bicycle use on existing BPA transmission line right-of-way in Longview, Washington. The Highland Trail would be located on existing BPA fee-owned right-of-way property along the BPA Longview-Cowlitz Number 1, 115-kilovolt (kV) transmission line corridor. It would be built within a 70-foot-wide Reserve

418

CX-007364: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Categorical Exclusion Determination 4: Categorical Exclusion Determination CX-007364: Categorical Exclusion Determination Provision of Funds to the Kootenai Tribe of Idaho to Purchase the Upper Twin Rivers Conservation Easement CX(s) Applied: B1.25 Date: 11/17/2011 Location(s): Idaho Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to fund the acquisition of 87 acres in the Kootenai River watershed for wildlife habitat mitigation. The acquisition parcel was selected for protection in part due to the potential to restore altered riparian habitats for wildlife, resident fish species (i.e., rainbow trout, bull trout, westslope cutthroat trout, kokanee) and the Kootenai River White Sturgeon, which is listed as threatened under the Endangered Species Act. The Kootenai River watershed

419

CX-007361: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

361: Categorical Exclusion Determination 361: Categorical Exclusion Determination CX-007361: Categorical Exclusion Determination Ashe-Marion #2 Spacer Replacements CX(s) Applied: B1.3 Date: 11/29/2011 Location(s): Oregon, Oregon, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace worn spacers along 69 miles of the Ashe-Marion No. 2 500-kilovolt Double Circuit Transmission Line (Structures 1/1 to 69/1). Work would be conducted on energized lines using live-line and bare-hand techniques as well as standard techniques requiring an outage. Spacers, which are located at various points along the conductor between transmission line towers, would be accessed using manned aerial line carts placed on the conductor either by a specialized heavily insulated line truck (178' Bronto), a standard

420

CX-009784: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

784: Categorical Exclusion Determination 784: Categorical Exclusion Determination CX-009784: Categorical Exclusion Determination Bertelsen Substation Metering Panel Segment Addition CX(s) Applied: B1.7 Date: 12/31/2012 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) and EWEB have developed a joint plan to add another BPA metering panel segment to the existing BPA Meter Rack at EWEB's Bertelsen Substation to meter the new EWEB Bertelsen-Seneca 115-kV tie line. BPA would design, fabricate, install, and test the new bidirectional meter panel segment to add to the existing BPA metering rack. BPA, at BPA's expense, will own, operate, and maintain the equipment and facilities installed. No ground disturbance or alteration to control house would occur.

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

CX-010147: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Categorical Exclusion Determination 7: Categorical Exclusion Determination CX-010147: Categorical Exclusion Determination Tualatin Valley Water District Waterline Land Use Review Request CX(s) Applied: B4.9 Date: 04/19/2013 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration is proposing to grant a Land Use Review Request (LURR) submitted by Tualatin Valley Water District (TVWD) to construct a portion of their proposed waterline on existing BPA fee-owned right-of-way (ROW) within BPA's Keeler-Oregon City No.2 115-kV transmission line corridor in the City of Beaverton, Oregon. Microsoft Word - CX_Memo_Amended_TVWD.docx More Documents & Publications CX-009697: Categorical Exclusion Determination CX-009701: Categorical Exclusion Determination CX-010145

422

CX-007355: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

55: Categorical Exclusion Determination 55: Categorical Exclusion Determination CX-007355: Categorical Exclusion Determination Modification of Metering Systems in Canby, Oregon CX(s) Applied: B1.7 Date: 12/02/2011 Location(s): Oregon Offices(s): Bonneville Power Administration In response to the need for Canby Utility Board to shift the load for Canby, Oregon, from PGE Canby Substation to a new Knights Bridge Substation in order to accommodate Canby load growth, Bonneville Power Administration (BPA) is planning to install a new meter at the new Knights Bridge Substation and modify the current metering systems at PGE's Twilight and Canby substations and Canby Utility Board's Wescott Substation. Canby Utility Board would build and own the Knights Bridge Substation. BPA would install, own, and operate bidirectional metering at the Knights Bridge

423

CX-007360: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7360: Categorical Exclusion Determination 7360: Categorical Exclusion Determination CX-007360: Categorical Exclusion Determination Provision of Funds To The Idaho Department of Fish and Game (IDFG) To Purchase the Rapid Lightening Creek Conservation Easement CX(s) Applied: B1.25 Date: 12/01/2011 Location(s): Idaho Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to provide funds to IDFG for the purchase of approximately 27 acres of land adjacent to the Rapid Lightning and Trout Creek Habitat Segments of the Pend Oreille River Wildlife Management Area (WMA). The subject property is located in Bonner County, Idaho, approximately 0.25 mile east of the Pack River. Acquisition of this property would add to the land base of the Pend Oreille River WMA and would protect a wetland area, and associated waterfowl habitat, on the

424

CX-009701: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

701: Categorical Exclusion Determination 701: Categorical Exclusion Determination CX-009701: Categorical Exclusion Determination Williams Northwest Pipeline Land Use Review Request CX(s) Applied: B4.9 Date: 12/27/2012 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to grant a Land Use Review Request (LURR) submitted by Williams Northwest Pipeline (WNP) to replace a portion of their 10-inch diameter South Seattle 2454 loop natural gas pipeline within their existing easement on BPA fee-owned right-of-way (ROW) within BPA's Maple Valley-Echo Lake transmission line corridor in King County, Washington. CX-009701.pdf More Documents & Publications CX-008680: Categorical Exclusion Determination EIS-0317-S1: Draft Supplemental Environmental Impact Statement

425

CX-008719: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

19: Categorical Exclusion Determination 19: Categorical Exclusion Determination CX-008719: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Naselle-Tarlett No. 1, Holcomb- Naselle No. 1, and Raymond-Willapa River No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. crossarms, insulators, and guy anchors) at existing H-frame structures along the subject transmission lines in Pacific County, Washington. Microsoft Word - CX-PacificCoWAWoodPolesFY12_WEB.doc More Documents & Publications CX-006794: Categorical Exclusion Determination EIS-0285-SA-118: Supplement Analysis

426

CX-007356: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6: Categorical Exclusion Determination 6: Categorical Exclusion Determination CX-007356: Categorical Exclusion Determination "Grant New Cingular Wireless' request for use of right-of-way at the Salem Substation CX(s) Applied: B4.9 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to grant a request submitted by New Cingular Wireless. BPA issued a CX for this project on September 19, 2011, however New Cingular Wireless slightly modified the location of the conduit and vault, and has resubmitted the right-of-way application. New Cingular Wireless proposes to place an approximately 140 foot long, 4 inch underground conduit from its existing wireless communications facility to an existing BPA utility pole located in a BPA right-of-way. A proposed

427

CX-009700: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Categorical Exclusion Determination 0: Categorical Exclusion Determination CX-009700: Categorical Exclusion Determination Finely Creek and North Valley Creek Property Funding CX(s) Applied: B1.25 Date: 12/27/2012 Location(s): Montana, Montana Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to fund the Confederated Salish and Kootenai Tribes (CSKT) for the purchase of 9 acres of property, referred to as the Finely Creek Property, in Missoula County, MT, and 38 acres of property, referred to as North Valley Creek, in Lake County, MT. The CSKT would own and manage both properties for fish and wildlife conservation purposes and BPA would receive a conservation easement to ensure that the habitat values on the property are always protected. CX-009700.pdf

428

CX-008709: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09: Categorical Exclusion Determination 09: Categorical Exclusion Determination CX-008709: Categorical Exclusion Determination Wood Pole Replacements As Needed on the Shelton-Fairmount No. 1, 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 05/24/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. crossarms, insulators, and guy anchors) at existing H-frame structures along the subject transmission line in Mason and Jefferson counties, Washington. Microsoft Word - CX-Shelton-Fairmount-WoodPolesFY12_WEB.doc More Documents & Publications CX-008693: Categorical Exclusion Determination CX-008708: Categorical Exclusion Determination

429

CX-009786: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

86: Categorical Exclusion Determination 86: Categorical Exclusion Determination CX-009786: Categorical Exclusion Determination Beck Road Substation Meter Installation CX(s) Applied: B1.7 Date: 01/07/2013 Location(s): Idaho Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to provide and operate new revenue metering equipment in the Beck Road Substation. Kootenai Electric Cooperative (KEC), a network integration customer of BPA, would transfer approximately 4.5 megawatt of load from its Pleasant View Substation to its proposed facility, the new 115/12.47-kilovolt (kV), 15/20/25 megavolt Ampere Beck Road Substation, to serve load growth in the region east of Spokane, Washington. CX-009786.pdf More Documents & Publications CX-008691: Categorical Exclusion Determination

430

CX-007362: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

362: Categorical Exclusion Determination 362: Categorical Exclusion Determination CX-007362: Categorical Exclusion Determination Longview Sectionalizing Breaker Upgrades CX(s) Applied: B1.11, B4.6 Date: 11/28/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to expand a 260-foot long section of its Longview Substation fence by 28 feet in order to accommodate the addition of a new sectionalizing breaker near bay 5, and to update an aging portion of the southeast fence line. Construction would include removal of top soil to install subsurface substation equipment, fill of imported soil to match existing substation grade, and construction and operation of a new sectionalizing breaker inside the new fence line. An approximate 280-foot by 40-foot construction area outside of and

431

CX-007991: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

991: Categorical Exclusion Determination 991: Categorical Exclusion Determination CX-007991: Categorical Exclusion Determination Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways CX(s) Applied: B1.3 Date: 02/10/2012 Location(s): Idaho Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) along the subject transmission lines. Microsoft Word - CX-Drummond-MacksInn_WoodPoleReplacementFY12_WEB.doc More Documents & Publications CX-009709: Categorical Exclusion Determination EIS-0267: Final Environmental Impact Statement EIS-0285-SA-82: Supplemental Analysis

432

CX-008714: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8714: Categorical Exclusion Determination 8714: Categorical Exclusion Determination CX-008714: Categorical Exclusion Determination Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to replace 18 deteriorating wood poles and associated structural/electrical components (e.g. cross arms, insulators, guy anchors, etc.) as well as cross arms on three other structures along the subject transmission lines. Microsoft Word - CX-Alvey-FairviewAlvey-MartinCreek-DrainWoodPolesFY12_WEB.doc More Documents & Publications CX-010344: Categorical Exclusion Determination

433

CX-008676: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

76: Categorical Exclusion Determination 76: Categorical Exclusion Determination CX-008676: Categorical Exclusion Determination Four AT&T Wireless Communication Site Upgrades CX(s) Applied: B1.7, B1.19 Date: 07/27/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration AT&T has submitted a Land Use Review Request for Bonneville Power Administration (BPA) to approve upgrades to fiber on four of its existing wireless communication sites located atop BPA transmission and communication towers. BPA has a commercial lease agreement with AT&T for collocation on its facilities and AT&T must request permission to update those facilities when they have the potential to affect BPA's transmission resources. Microsoft Word - 4 ATT Sites - CX.docx

434

CX-010734: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

734: Categorical Exclusion Determination 734: Categorical Exclusion Determination CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to replace existing culverts at 12 access road stream crossings that present barriers to fish passage. These improvements will be made on BPA easement access roads within Department of Natural Resources (DNR) owned and managed lands. BPA will make these improvements by installing new fish friendly culverts and/or bridges at each stream crossing. CX-010734.pdf More Documents & Publications CX-008890: Categorical Exclusion Determination CX-010432: Categorical Exclusion Determination

435

CX-009705: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

705: Categorical Exclusion Determination 705: Categorical Exclusion Determination CX-009705: Categorical Exclusion Determination Lane Substation 500/230-kV Transformer Phase Separation Project CX(s) Applied: B4.6 Date: 12/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to increase the physical distance that separates each phase of the 500/230-kiloVolt transformer banks at BPA's Lane Substation. The reason for the increased distance is to minimize the effects of a transformer fire or explosion as outlined in the Institute of Electrical and Electronic Engineers, Inc. guidelines for substation fire suppression. CX-009705.pdf More Documents & Publications CX-008705: Categorical Exclusion Determination CX-009708: Categorical Exclusion Determination

436

CX-009702: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

02: Categorical Exclusion Determination 02: Categorical Exclusion Determination CX-009702: Categorical Exclusion Determination Columbia Rural Electric Association Walla Walla Hydroelectric Project CX(s) Applied: B4.1 Date: 12/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration In response to Columbia Rural Electric Association's (CREA) small generator interconnection request, Bonneville Power Administration (BPA) proposes to integrate the existing 2.25-megawatt City of Walla Walla hydro project into the Federal Columbia River Transmission System (FCRTS). The proposed point of receipt of the electricity generated from the Walla Walla hydro project is an existing tap for CREA's distribution line at BPA's Walla Walla substation. CX-009702.pdf More Documents & Publications

437

CX-007358: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8: Categorical Exclusion Determination 8: Categorical Exclusion Determination CX-007358: Categorical Exclusion Determination Integration of the University of Oregon's Cogeneration Project CX(s) Applied: B1.7 Date: 12/01/2011 Location(s): Oregon Offices(s): Bonneville Power Administration In response to the University of Oregon's small generator interconnection request, Bonneville Power Administration (BPA) is planning to integrate their 11-megawatt generation project into its balancing authority (BA). The proposed point of interconnection is at the University of Oregon Substation owned by Eugene Water and Electric Board. In order to integrate the proposed generation, BPA would install and operate bi-directional metering at the University of Oregon generation site. The University of Oregon would

438

Categorical Exclusion Determinations: B4.11 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 18, 2012 January 18, 2012 CX-007604: Categorical Exclusion Determination General Motors Battery Pack Assembly Plant - Electric Substation Upgrade CX(s) Applied: B4.11 Date: 01/18/2012 Location(s): Michigan Offices(s): National Energy Technology Laboratory October 11, 2011 CX-006889: Categorical Exclusion Determination Bristol to Groton Transmission Line Upgrade Project CX(s) Applied: B4.11 Date: 10/11/2011 Location(s): South Dakota Office(s): Western Area Power Administration-Upper Great Plains Region September 27, 2011 CX-006815: Categorical Exclusion Determination Cattle Creek Substation CX(s) Applied: B4.11 Date: 09/27/2011 Location(s): Bonneville County, Idaho Office(s): Bonneville Power Administration September 15, 2011 CX-006896: Categorical Exclusion Determination Maxwell - O'Banion Optical Ground Wire

439

CX-010723: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

723: Categorical Exclusion Determination 723: Categorical Exclusion Determination CX-010723: Categorical Exclusion Determination Douglas County Public Utility District (PUD) Fiber Land Use Review Request; Case #20130491 CX(s) Applied: B4.9 Date: 08/19/2013 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to approve a request from the Public Utility District (PUD) to use existing 4-inch conduit and two customer vaults at BPA's Columbia Substation to install 400 feet of fiber optic cable. The PUD is expanding their fiber system and would like to use existing facilities to the greatest extent possible to minimize disturbance. CX-010723.pdf More Documents & Publications CX-010586: Categorical Exclusion Determination CX-008688: Categorical Exclusion Determination

440

CX-007365: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

365: Categorical Exclusion Determination 365: Categorical Exclusion Determination CX-007365: Categorical Exclusion Determination Integration of the Green Lane Energy Biogas Generator CX(s) Applied: B1.7 Date: 11/17/2011 Location(s): Oregon Offices(s): Bonneville Power Administration In response to Green Lane Energy's small generator interconnection request, Bonneville Power Administration (BPA) is planning to integrate their 1.6-megawatt biogas generation project into its balancing authority (BA). The proposed point of interconnection is at the Parker Substation owned by Blachly Lane Electric Cooperative (Blachly-Lane). In order to integrate the proposed generation, Green Lane Energy would install-at their own expense-BPA approved metering and communications service equipment at the Green Lane Energy project site. BPA would commission and

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

CX-007749: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7749: Categorical Exclusion Determination 7749: Categorical Exclusion Determination CX-007749: Categorical Exclusion Determination Provision of Funds to the Colville Confederated Tribes for the Purchase of Two Parcels of Land Along the Okanogan River CX(s) Applied: B1.25 Date: 01/04/2012 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to fund the acquisition of two properties in the Okanogan River watershed by the Colville Confederated Tribes (CCT). BPA will be granted a perpetual conservation easement over the entire property as a condition of funding the acquisition. The properties are being acquired because of their outstanding riparian habitat resource value. The acquisition will provide an opportunity to enhance, restore, and manage high quality habitat for populations of summer/fall

442

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 8460 of 28,905 results. 51 - 8460 of 28,905 results. Download CX-010720: Categorical Exclusion Determination Monroe-Custer #2 Access Roads CX(s) Applied: B1.3 Date: 08/26/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010720-categorical-exclusion-determination Download CX-005411: Categorical Exclusion Determination Troutdale Substation Control House CX(s) Applied: B1.3 Date: 03/03/2011 Location(s): Troutdale, Oregon Office(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-005411-categorical-exclusion-determination Download 2012 Annual Planning Summary for Legacy Management The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Legacy Management.

443

CX-007363: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Categorical Exclusion Determination 3: Categorical Exclusion Determination CX-007363: Categorical Exclusion Determination Provision of Funds to the Kalispell Tribe to Purchase the West Calispell Road Conservation Easement CX(s) Applied: B1.25 Date: 11/17/2011 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is providing funding to the Kalispel Tribe to conserve a 104-acre parcel in Pend Oreille County, Washington. The acquisition parcel was selected for protection due to the potential to restore altered riparian and wetland habitats for wildlife and resident fish species. Over time, the restoration of the property will provide habitat for ducks, osprey, eagles, and species dependant on forested wetlands to meet their life requirements. An unnamed tributary to Calispell

444

CX-010727: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

27: Categorical Exclusion Determination 27: Categorical Exclusion Determination CX-010727: Categorical Exclusion Determination Dayton Tap Line Retirement CX(s) Applied: B4.10 Date: 08/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to retire and remove the Dayton Tap Line (and associated components) and fund PacifiCorp's removal of associated equipment. The Dayton Tap facility was constructed within PacificCorp's transmission line right-of-way to establish a transmission line tap from PacificCorp's transmission line to a BPA customer. Since the customer will no longer be served via this tap, the Dayton Tap facility is no longer needed. CX-010727.pdf More Documents & Publications CX-003027: Categorical Exclusion Determination

445

CX-010728: Categorical Exclusion Determination | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

10728: Categorical Exclusion Determination 10728: Categorical Exclusion Determination CX-010728: Categorical Exclusion Determination Longview-Chehalis No. 1 and No. 3, and Lexington-Longview No. 1 Access Roads Maintenance CX(s) Applied: B1.3 Date: 08/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) proposes to perform routine road maintenance including reconstructing, grading, and shaping of roads, placing and compacting of rock surfacing, installation and maintenance of erosion control and water drainage features, and restoration of disturbed areas along existing access roads, both on and off the right-of-way (ROW). CX-010728.pdf More Documents & Publications CX-008708: Categorical Exclusion Determination CX-008693: Categorical Exclusion Determination

446

Power Subscription Strategy: Administrator`s Record of Decision.  

SciTech Connect

The Bonneville Power Administration (BPA) has decided to adopt a Power Subscription Strategy for entering into new power sales contracts with its Pacific Northwest customers. The Strategy equitably distributes the electric power generated by the Federal Columbia River Power System (FCRPS) within the framework of existing law. The Power Subscription Strategy addresses the availability of power; describes power products; lays out strategies for pricing, including risk management; and discusses contract elements. In proceeding with this Subscription Strategy, BPA is guided by and committed to the Fish and Wildlife funding Principles for the BPA announced by the Vice President of the US in September 1998. This Record of Decision (ROD) addresses the issues raised by commenters who responded to BPA`s Power Subscription Strategy Proposal during and after the comment period that began with the release of the Proposal on September 18, 1998. The ROD is organized in approximately the same way as the Proposal and the Power Subscription Strategy that BPA developed based on the comments received. Abbreviations of party names used in citations appear in the section just preceding this introduction; a list of all the commenters follows the text of the ROD.

United States. Bonneville Power Administration

1998-12-01T23:59:59.000Z

447

Categorical Exclusion Determinations: Washington | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 7, 2013 January 7, 2013 CX-009785: Categorical Exclusion Determination Roosevelt Radio Station Emergency Generator Removal and Replacement CX(s) Applied: B1.3 Date: 01/07/2013 Location(s): Washington Offices(s): Bonneville Power Administration January 3, 2013 CX-010563: Categorical Exclusion Determination Pacific Northwest National Laboratory- Non-Wire Methods for Transmission Congestion Management Through Predictive Simulation and Optimization CX(s) Applied: B3.6 Date: 01/03/2013 Location(s): Washington, North Carolina, Illinois, Oregon Offices(s): Advanced Research Projects Agency-Energy December 27, 2012 CX-009699: Categorical Exclusion Determination Continuation of Yakama Nation Sturgeon Management Project CX(s) Applied: B1.20 Date: 12/27/2012 Location(s): Washington, Washington

448

Categorical Exclusion Determinations: Montana | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Montana Montana Categorical Exclusion Determinations: Montana Location Categorical Exclusion Determinations issued for actions in Montana. DOCUMENTS AVAILABLE FOR DOWNLOAD September 11, 2013 CX-011006: Categorical Exclusion Determination Scalable, Automated, Semi Permanent Seismic Method for Detecting Carbon Dioxide Plume Extent During Geological... CX(s) Applied: B3.1 Date: 09/11/2013 Location(s): Montana Offices(s): National Energy Technology Laboratory July 26, 2013 CX-010583: Categorical Exclusion Determination Upper Jocko River Property Funding CX(s) Applied: B1.25 Date: 07/16/2013 Location(s): Montana Offices(s): Bonneville Power Administration July 24, 2013 CX-010481: Categorical Exclusion Determination Differential Absorption Lidar (DIAL) for Spatial Mapping of Carbon Dioxide

449

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

81 - 20290 of 31,917 results. 81 - 20290 of 31,917 results. Download Audit Report: OAS-L-04-06 Federal Managers' Financial Integrity Act Audit Report Audit Report http://energy.gov/ig/downloads/audit-report-oas-l-04-06 Download CX-010578: Categorical Exclusion Determination Celilo Converter Station Upgrades CX(s) Applied: B4.11 Date: 07/25/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010578-categorical-exclusion-determination Download CX-010602: Categorical Exclusion Determination The Coal-Seq III Consortium: Advancing the Science of Carbon Dioxide Sequestration in Coal Seam and Gas Shale CX(s) Applied: A9 Date: 07/25/2013 Location(s): Virginia, Texas Offices(s): National Energy Technology Laboratory http://energy.gov/nepa/downloads/cx-010602-categorical-exclusion-determination

450

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 15820 of 26,764 results. 11 - 15820 of 26,764 results. Download CX-010590: Categorical Exclusion Determination Kalispell Shunt Cap Addition Project CX(s) Applied: B4.11 Date: 07/01/2013 Location(s): Montana Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010590-categorical-exclusion-determination Download EERE Program Management Guide- Appendix M Appendix M provides information on support service contracts, which are a significant portion of the Department's total contracting effort. http://energy.gov/eere/downloads/eere-program-management-guide-appendix-m Download CX-010774: Categorical Exclusion Determination Iona Relay Station Maintenance CX(s) Applied: B1.3, B1.11, B2.5 Date: 07/25/2013 Location(s): Idaho Offices(s): Nuclear Energy http://energy.gov/nepa/downloads/cx-010774-categorical-exclusion-determination

451

Categorical Exclusion Determinations: B1.7 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

November 21, 2011 November 21, 2011 CX-007697: Categorical Exclusion Determination Autogrid, Inc. - Highly Dispatchable and Distributed Demand Response for the Integration of Distributed Generation CX(s) Applied: A9, B1.7 Date: 11/21/2011 Location(s): New York, California Offices(s): Advanced Research Projects Agency-Energy November 17, 2011 CX-007365: Categorical Exclusion Determination Integration of the Green Lane Energy Biogas Generator CX(s) Applied: B1.7 Date: 11/17/2011 Location(s): Oregon Offices(s): Bonneville Power Administration September 23, 2011 CX-006826: Categorical Exclusion Determination State Energy Program American Recovery and Reinvestment Act - Washington State University Anaerobic Digester - Nutrient Recovery Technology CX(s) Applied: A9, B1.7, B5.1 Date: 09/23/2011

452

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 5160 of 8,172 results. 51 - 5160 of 8,172 results. Download CX-007850: Categorical Exclusion Determination Notice of Proposed Rulemaking for Energy Conservation Standards for Certain Reflector, Elliptical Reflector, and Bulged Reflector Incandescent Reflector Lamps CX(s) Applied: B5.1 Date: 01/09/2012 Location(s): Nationwide Offices(s): Energy Efficiency and Renewable Energy http://energy.gov/nepa/downloads/cx-007850-categorical-exclusion-determination Download CX-007993: Categorical Exclusion Determination Hatwai 230-Kilovolt Substation Breaker Replacement CX(s) Applied: B4.6 Date: 02/09/2012 Location(s): Idaho Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-007993-categorical-exclusion-determination Download CX-008013: Categorical Exclusion Determination

453

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

51 - 31360 of 31,917 results. 51 - 31360 of 31,917 results. Download CX-008703: Categorical Exclusion Determination Oregon City-Chemawa #2 Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 05/31/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008703-categorical-exclusion-determination Download CX-008733: Categorical Exclusion Determination Film Processing Project at Test Reactor Area (TRA)-678 CX(s) Applied: B6.1 Date: 05/21/2012 Location(s): Idaho Offices(s): Idaho Operations Office http://energy.gov/nepa/downloads/cx-008733-categorical-exclusion-determination Download Transportation Emergency Preparedness Program Exercise Overview http://energy.gov/em/downloads/transportation-emergency-preparedness-program-exercise-overview

454

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

61 - 26870 of 28,560 results. 61 - 26870 of 28,560 results. Download CX-009535: Categorical Exclusion Determination Three-dimensional Minority Carrier Lifetime Mapping of Thin Film Semiconductors for Solar Cell Applications CX(s) Applied: A9, B3.6 Date: 11/02/2012 Location(s): California Offices(s): Golden Field Office http://energy.gov/nepa/downloads/cx-009535-categorical-exclusion-determination Download CX-009711: Categorical Exclusion Determination Tucannon River Substation Expansion Project CX(s) Applied: B4.6 Date: 11/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-009711-categorical-exclusion-determination Download Preliminary Notice of Violation, BJC- WEA-2010-01 Preliminary Notice of Violation issued to Bechtel Jacobs Company, LLC

455

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 27430 of 28,560 results. 21 - 27430 of 28,560 results. Download CX-008883: Categorical Exclusion Determination Indian Creek Property Funding CX(s) Applied: B1.25 Date: 08/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008883-categorical-exclusion-determination Download CX-008898: Categorical Exclusion Determination Georgia-City-Columbus CX(s) Applied: A1, A9, A11, B1.32, B2.5, B5.1 Date: 08/01/2012 Location(s): Georgia Offices(s): Energy Efficiency and Renewable Energy http://energy.gov/nepa/downloads/cx-008898-categorical-exclusion-determination Download GammaCam Technology Demonstration at ORNL Buildings 3026C and 3026D The GammaCam system is an effective tool for remotely identifying high gamma radiation in radioactive environments. Its versatility allows the

456

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

71 - 13580 of 28,560 results. 71 - 13580 of 28,560 results. Download Contractor SOW Template - ICE http://energy.gov/management/downloads/contractor-sow-template-ice Download CX-008715: Categorical Exclusion Determination 2012 Alvey District Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008715-categorical-exclusion-determination Download CX-009571: Categorical Exclusion Determination Innovation Realization: Building and Supporting an Advanced Contract Manufacturing Cluster in Southeast Michigan CX(s) Applied: A9, B3.6 Date: 12/13/2012 Location(s): Michigan Offices(s): Golden Field Office http://energy.gov/nepa/downloads/cx-009571-categorical-exclusion-determination

457

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

71 - 4580 of 9,640 results. 71 - 4580 of 9,640 results. Download CX-010438: Categorical Exclusion Determination Chenoweth-Goldendale Number 1 Disconnect Switch Project CX(s) Applied: B4.6 Date: 05/30/2013 Location(s): Washington Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010438-categorical-exclusion-determination Download CX-010440: Categorical Exclusion Determination Reduced Cost Bond Layers for Multi-Layer Thermal/Environmental Barrier Coatings CX(s) Applied: B3.6 Date: 06/21/2013 Location(s): Alabama Offices(s): National Energy Technology Laboratory http://energy.gov/nepa/downloads/cx-010440-categorical-exclusion-determination Download CX-010441: Categorical Exclusion Determination Reduced Cost Bond Layers for Multi-Layer Thermal/Environmental Barrier

458

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 25720 of 26,764 results. 11 - 25720 of 26,764 results. Download Audit Report: OAS-L-05-09 Audit of the National Nuclear Security Administration's Deferred Maintenance http://energy.gov/ig/downloads/audit-report-oas-l-05-09 Download CX-010708: Categorical Exclusion Determination Office of Secure Transportation Vehicle Maintenance Facility Improvements CX(s) Applied: B2.1, B2.2, B2.5, B4.6 Date: 05/29/2013 Location(s): Tennessee Offices(s): Oak Ridge Office http://energy.gov/nepa/downloads/cx-010708-categorical-exclusion-determination Download CX-010578: Categorical Exclusion Determination Celilo Converter Station Upgrades CX(s) Applied: B4.11 Date: 07/25/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010578-categorical-exclusion-determination

459

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21 - 6030 of 26,764 results. 21 - 6030 of 26,764 results. Download CX-009226: Categorical Exclusion Determination CH2MHill Plateau Remediation Company - Routine Maintenance and Custodial Services CX(s) Applied: B1.3 Date: 09/04/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office http://energy.gov/nepa/downloads/cx-009226-categorical-exclusion-determination Download CX-010160: Categorical Exclusion Determination Sundial Island Transmission Tower Relocation CX(s) Applied: B4.6 Date: 03/20/2013 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-010160-categorical-exclusion-determination Download CX-010165: Categorical Exclusion Determination Libby-Troy Access Road Upgrades CX(s) Applied: B1.3 Date: 03/20/2013 Location(s): Montana

460

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

891 - 24900 of 28,905 results. 891 - 24900 of 28,905 results. Download CX-009582: Categorical Exclusion Determination Direct Drive Wave Energy Buoy CX(s) Applied: A9, B3.6 Date: 12/19/2012 Location(s): Oregon Offices(s): Golden Field Office http://energy.gov/nepa/downloads/cx-009582-categorical-exclusion-determination Download CX-009705: Categorical Exclusion Determination Lane Substation 500/230-kV Transformer Phase Separation Project CX(s) Applied: B4.6 Date: 12/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-009705-categorical-exclusion-determination Download Enforcement Letter, BWXT Y-12- June 15, 2006 Enforcement Letter issued to BWXT Y-12 related to Quality Assurance Deficiencies in construction activities at the Y-12 National Security

Note: This page contains sample records for the topic "officess bonneville power" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Page not found | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

11 - 24620 of 26,764 results. 11 - 24620 of 26,764 results. Download CX-008718: Categorical Exclusion Determination Revolution Energy Services (RES) Agriculture (Ag) - Forest Glen Oaks LLC Biomass Project CX(s) Applied: B4.13 Date: 05/16/2012 Location(s): Oregon Offices(s): Bonneville Power Administration http://energy.gov/nepa/downloads/cx-008718-categorical-exclusion-determination Download CX-008727: Categorical Exclusion Determination Materials and Fuel Complex - Sodium Processing Facility Tank System Resource Conservation and Recovery Act Closure CX(s) Applied: B6.1 Date: 06/27/2012 Location(s): Idaho Offices(s): Idaho Operations Office http://energy.gov/nepa/downloads/cx-008727-categorical-exclusion-determination Download Meeting Summary for HTF PA Scoping Meeting Notes for the Savannah River Site H-Area Tank Farm Performance

462

Wallula-McNary Transmission Line Project and Wallula Power Project EIS (DOE/EIS-0030)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECORD OF DECISION for the Wallula-McNary Transmission Line Project and Wallula Power Project THE DECISION The Bonneville Power Administration (BPA) has decided to implement its portion of the proposed action identified in the Wallula Power Project and Wallula-McNary Transmission Line Project Final Environmental Impact Statement (DOE/EIS-0330, August 2002). The proposed action includes construction of the Wallula Power Project (Wallula Project) that has been proposed by Wallula Generation, LLC (Wallula LLC). The proposed Wallula Project is a 1,300- megawatt (MW) natural-gas-fired, combined-cycle turbine power plant that Wallula LLC is planning to construct on a site near the Columbia River in Walla Walla County, Washington, approximately eight miles south of the City of Pasco. BPA's portion of the proposed action

463

Electric Power Lines : Questions and Answers on Research into Health Effects.  

Science Conference Proceedings (OSTI)

Most people know that electric power lines, like the wiring in our homes, can cause serious electric shocks if we`re not careful. Many people also want to know whether the electric and magnetic fields (EMF) produced by power lines and other electrical devices cause health effects. The purpose of this pamphlet is to answer some common questions that the Bonneville Power Administration (BPA) receives about the possible effects of power lines on health. (BPA is the Pacific Northwest`s Federal electric power marketing agency.) First, some basic electrical terms are defined, and electric and magnetic fields are described. Next, answers are given to several questions about recent scientific studies. We then describe how BPA is addressing public concerns raised by these studies. Some important information about electrical safety follows. The last section tells you how to obtain more detailed information about the health and safety issues summarized in this pamphlet.

United States. Bonneville Power Administration.

1993-11-01T23:59:59.000Z

464

Living and Working Safely Around High-Voltage Power Lines.  

Science Conference Proceedings (OSTI)

High-voltage transmission lines can be just as safe as the electrical wiring in the homes--or just as dangerous. The crucial factor is ourselves: they must learn to behave safely around them. This booklet is a basic safety guide for those who live and work around power lines. It deals primarily with nuisance shocks due to induced voltages, and with potential electric shock hazards from contact with high-voltage lines. References on possible long-term biological effects of transmission lines are shown. In preparing this booklet, the Bonneville Power Administration has drawn on more than 50 years of experience with high-voltage transmission. BPA operates one of the world`s largest networks of long-distance, high-voltage lines. This system has more than 400 substations and about 15,000 miles of transmission lines, almost 4,400 miles of which are operated at 500,000 volts.

United States. Bonneville Power Administration.

2001-06-01T23:59:59.000Z

465

Microsoft PowerPoint - DOE_Review_June2013-TrudnowskiV2.pptx  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Stability Stability Assessment DOE/OE Transmission Reliability R&D Internal Program Review Meeting June 27-28, 2013 Washington DC Dan Trudnowski, Montana Tech John Pierre, U of Wyoming 2 Project Overview * Objective: Develop, test, and refine algorithms to automatically estimate and quantify oscillations from PMUs in real time. * Application - Real-Time Situational Awareness based upon actual system observations * Time line: - April 2006 thru April 2015 * Participants: - Dan Trudnowski, Montana Tech - John Pierre, University of Wyoming - Louis Scharf, Colorado State University (Retired) - Lots of graduate students * Collaborators: - Ning Zhou, PNNL (funded independently) - Bonneville Power Administration * Advisors - John Hauer, PNNL (Retired) - Bill Mittelstadt, BPA (Retired) Dynamic Response Types

466

Design and Analysis of Salmonid Tagging Studies in the Columbia Basin, Volume XIV; Appraisal of the Relationship between Tag Detection Efficiency at Bonneville Dam and the Precision in Estuarine and Marine Survival Estimates on Returning PIT Tagged Chinook Salmon, 2000 Technical Report.  

DOE Green Energy (OSTI)

In the advent of the installation of a PIT-tag interrogation system in the Cascades Island fish ladder at Bonneville Dam, this report provides guidance on the anticipated precision of salmonid estuarine and marine survival estimates, for various levels of system-wide adult detection probability at Bonneville Dam. Precision was characterized by the standard error of the survival estimates and the coefficient of variation of the survival estimates. The anticipated precision of salmonid estuarine and marine survival estimates was directly proportional to the number of PIT-tagged smolts released and to the system-wide adult detection efficiency at Bonneville Dam, as well as to the in-river juvenile survival above Lower Granite Dam. Moreover, for a given release size and system-wide adult detection efficiency, higher estuarine and marine survivals did also produce more precise survival estimates. With a system-wide detection probability of P{sub BA} = 1 at Bonneville Dam, the anticipated CVs for the estuarine and marine survival ranged between 41 and 88% with release sizes of 10,000 smolts. Only with the 55,000 smolts being released from sites close to Lower Granite Dam and under high estuarine and marine survival, could CVs of 20% be attained with system detection efficiencies of less than perfect detection (i.e., P{sub BA} < 1).

Perez-Comas, Jose A.; Skalski, John R. (University of Washington, School of Fisheries, Seattle, WA)

2000-07-01T23:59:59.000Z

467

Categorical Exclusion Determinations: Idaho | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

March 7, 2011 March 7, 2011 CX-005418: Categorical Exclusion Determination Birch Creek Radio Tower CX(s) Applied: B4.6 Date: 03/07/2011 Location(s): Bonneville County, Idaho Office(s): Bonneville Power Administration March 4, 2011 CX-005364: Categorical Exclusion Determination Idaho Completion Project Environmental and Regulatory Service Activities CX(s) Applied: B3.1 Date: 03/04/2011 Location(s): Idaho Office(s): Nuclear Energy, Idaho Operations Office January 31, 2011 CX-009402: Categorical Exclusion Determination Overpack Transfer Path Extension General Plant Project CX(s) Applied: B1.13 Date: 01/31/2011 Location(s): Idaho Offices(s): Naval Nuclear Propulsion Program January 27, 2011 CX-005186: Categorical Exclusion Determination Facility Construction and Modification in Support of the Material Security

468

EIS-0367: Notice of Intent to Prepare an Environmental Impact...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0367: Notice of Intent to Prepare an Environmental Impact Statement Bonneville Power Administration Transmission Policy Bonneville Power Administration (BPA) proposes to...

469

Power Operations  

NLE Websites -- All DOE Office Websites (Extended Search)

Power Operations Outage Coordination Standards of Conduct Transmission Planning You are here: SN Home page > Power Operations Power Operations Western's Sierra Nevada Region...

470

Operations, Maintenance, and Replacement 10-year plan, 1990-1999 : 1989 Utility OM&R Comparison : A Comparison of BPA (Bonneville Power Administration) and Selected Utility Transmission, Operations and Maintenance Costs.  

SciTech Connect

For the past several years, competing resource demands within BPA have forced the Agency to stretch Operations, Maintenance and Replacement (OM R) resources. There is a large accumulation of tasks that were not accomplished when scheduled. Maintenance and replacements and outages, due to material and equipment failure, appear to be increasing. BPA has made a strategic choice to increase its emphasis on OM R programs by implementing a multi-year, levelized OM R plan which is keyed to high system reliability. This strategy will require a long-term commitment of a moderate increase in staff and dollars allocated to these programs. In an attempt to assess the direction BPA ha