Powered by Deep Web Technologies
Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

How to Select Lighting Controls for Offices and Public Buildings  

Broader source: Energy.gov (indexed) [DOE]

can be used for demand limiting to allow building managers to reduce lighting loads when electricity demand costs are high. Some types of lighting are not well suited to certain...

2

Grand Junction Projects Office Remedial Action Project Building 2 public dose evaluation. Final report  

SciTech Connect (OSTI)

Building 2 on the U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) site, which is operated by Rust Geotech, is part of the GJPO Remedial Action Program. This report describes measurements and modeling efforts to evaluate the radiation dose to members of the public who might someday occupy or tear down Building 2. The assessment of future doses to those occupying or demolishing Building 2 is based on assumptions about future uses of the building, measured data when available, and predictive modeling when necessary. Future use of the building is likely to be as an office facility. The DOE sponsored program, RESRAD-BUILD, Version. 1.5 was chosen for the modeling tool. Releasing the building for unrestricted use instead of demolishing it now could save a substantial amount of money compared with the baseline cost estimate because the site telecommunications system, housed in Building 2, would not be disabled and replaced. The information developed in this analysis may be used as part of an as low as reasonably achievable (ALARA) cost/benefit determination regarding disposition of Building 2.

Morris, R.

1996-05-01T23:59:59.000Z

3

Office Buildings - Full Report  

Gasoline and Diesel Fuel Update (EIA)

1). Table 1. Totals and means of of floorspace, number of workers, and hours of operation for office buildings, 2003 Buildings (thousand) Total Floorspace (million sq. ft.)...

4

A Look at Office Buildings - Index  

Gasoline and Diesel Fuel Update (EIA)

professional offices, and administrative offices. For example, an office may be a computer center, bank, consultant's office, law office, or medical office. An office building...

5

Evaluation of Energy Concepts for Office Buildings  

E-Print Network [OSTI]

Evaluation of Energyconcepts for Office Buildings Fisch, M. Norbert, Stefan Plesser; IGS – Institute for Building and Solar Technology, Technical University Braunschweig, Germany September 2005 Abstract “Glass façades” have become a... synonym for innovative office buildings in Germany over the last 10 years. Since almost no reliable results of measurement and verification have been made public on the performance of these buildings – often very prominent company headquarters...

Fisch, M.; Norbert, M.; Plesser, S.

2005-01-01T23:59:59.000Z

6

Bradshaw Construction New Office Building  

High Performance Buildings Database

Eldersburg, MD The New Office Building is part of an effort by Bradshaw Construction Corporation to combine office, off-site shop buildings and off-site storage yards at one consolidated location. The new site, located off Maryland Route 26, shall provide space for an office building and parking; and secured shop building and storage yard. The New Office Building Project has achieved LEED Silver certification. The office building is designed as a free standing building of approximately 8,200 square feet in area, one story in height.

7

Achieving 50% Energy Savings in Office Buildings, Advanced Energy Design Guides: Office Buildings (Brochure)  

SciTech Connect (OSTI)

This fact sheet summarizes recommendations for designing new office buildings that result in 50% less energy use than conventional designs meeting minimum code requirements. The recommendations are drawn from the Advanced Energy Design Guide for Small to Medium Office Buildings, an ASHRAE publication that provides comprehensive recommendations for designing low-energy-use office buildings with gross floor areas up to 100,000 ft2 (see sidebar). Designed as a stand-alone document, this fact sheet provides key principles and a set of prescriptive design recommendations appropriate for smaller office buildings with insufficient budgets to fully implement best practices for integrated design and optimized performance. The recommendations have undergone a thorough analysis and review process through ASHRAE, and have been deemed the best combination of measures to achieve 50% savings in the greatest number of office buildings.

Not Available

2014-09-01T23:59:59.000Z

8

Energy use in office buildings  

SciTech Connect (OSTI)

This is the report on Task IB, Familiarization with Additional Data Collection Plans of Annual Survey of BOMA Member and Non-Member Buildings in 20 Cities, of the Energy Use in Office Buildings project. The purpose of the work was to monitor and understand the efforts of the Building Owners and Managers Association International (BOMA) in gathering an energy-use-oriented data base. In order to obtain an improved data base encompassing a broad spectrum of office space and with information suitable for energy analysis in greater detail than is currently available, BOMA undertook a major data-collection effort. Based on a consideration of geographic area, climate, population, and availability of data, BOMA selected twenty cities for data collection. BOMA listed all of the major office space - buildings in excess of 40,000 square feet - in each of the cities. Tax-assessment records, local maps, Chamber of Commerce data, recent industrial-development programs, results of related studies, and local-realtor input were used in an effort to assemble a comprehensive office-building inventory. In order to verify the accuracy and completeness of the building lists, BOMA assembled an Ad-Hoc Review Committee in each city to review the assembled inventory of space. A questionnaire on office-building energy use and building characteristics was developed. In each city BOMA assembled a data collection team operating under the supervision of its regional affiliate to gather the data. For each city a random sample of buildings was selected, and data were gathered. Responses for over 1000 buildings were obtained.

None

1980-10-01T23:59:59.000Z

9

Campus Public Safety Office Michael Soto, Director of Public Safety  

E-Print Network [OSTI]

Campus Public Safety Office Michael Soto, Director of Public Safety Service Resource, teaching, research and service. Michael D. Soto Director of Public Safety Public Safety Office Service

Bertini, Robert L.

10

Building Technologies Office Overview  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top Five EEREDepartmentFebruaryResistanceBuilding EnergyEnergy 2015

11

Director's Office Building 510F  

E-Print Network [OSTI]

Director's Office Building 510F P.O. Box 11973-5000 Phone 516 344-5414 Fax 516 344-5820 tkirk report the following recommendation was made regarding your experiment, AGS E951, "An R&D Program as part of the national muon collider R&D program. On behalf of Brookhaven National Laboratory

McDonald, Kirk

12

Identification of Market Requirements of Smart Buildings Technologies for High Rise Office Buildings  

E-Print Network [OSTI]

practices of utilizing hi-tech smart building technologies in office buildings, required additional features of smart building technologies for office buildings, challenges for integrating smart building technologies for office buildings, major benefits...

Reffat, R. M.

2010-01-01T23:59:59.000Z

13

Green Energy Standards for Public Buildings  

Broader source: Energy.gov [DOE]

In March 2012, West Virginia enacted the Green Buildings Act, which applies to all new construction of public buildings, buildings receiving state grant funds, and buildings receiving state...

14

Privately owned public space attached to office buildings in Manhattan : economic and urban perspectives of incentive zoning  

E-Print Network [OSTI]

This thesis examines the Incentive Zoning Policy of New York City from economic and urban perspectives. In the first part, it evaluates empirically the economic contribution of privately owned public space to the value of ...

Cai, Hongyu.

2003-01-01T23:59:59.000Z

15

Ghana Green Building Council public launch  

E-Print Network [OSTI]

Ghana Green Building Council public launch examples of green buildings in South Africa eric noir, WSP GBD 17 August 2011 #12;Ghana Green Building Council public launch | examples of green buildings in South Africa GREEN by DESIGN PLATINUM GOLD MAJORSPONSORS #12;Ghana Green Building Council public launch

16

Public Parking > Agriculture Building Parkade**  

E-Print Network [OSTI]

P P P P P P P P P P M M M 1 C 3 2 B A R O O 9 L 5 Y Q T U U 16 15 4 P 18 17 7 H Public Parking > Agriculture Building Parkade** > Pay Parking Lots** > Stadium Parkade** > Diefenbaker Lot > Health Sciences Lots Buildings Place Riel Student Centre - PH 306-966-6988 1 Campus Drive Royal University Hospital

Saskatchewan, University of

17

Biology Advising Office Building 44, Room 135  

E-Print Network [OSTI]

Biology Advising Office Building 44, Room 135 Mailing Address: Biology Advising Office, University of Utah, 257 South 1400 East, Salt Lake City, Utah 84112-0840 http://www.biology.utah.edu/undergraduate/advising.php Email: advising@biology.utah.edu Phone: (801) 581-6244 Fax: (801) 581-8571 Dr. David Gard, Director

Tipple, Brett

18

Reference Buildings by Building Type: Large office  

Office of Energy Efficiency and Renewable Energy (EERE)

In addition to the ZIP file for each building type, you can directly view the "scorecard" spreadsheet that summarizes the inputs and results for each location. This Microsoft Excel spreadsheet is also included in the ZIP file. For version 1.4, only the IDF file is included.

19

Continuous Commissioning® in an Aged Office Building  

E-Print Network [OSTI]

ICEBO2005 Cui and Liu Continuous Commissioning SM in an Aged Office Building Y. Cui, Ph.D. Energy Systems Laboratory Architectural Engineering Department University of Nebraska-Lincoln Omaha, NE 68182 cuiy@unomaha.edu Mingsheng Liu, Ph... and Liu Units (AHUs). Among these, 7 AHUs serve the Main Building and Executive Wing areas: one AHU, called Primary AHU, for the perimeter of the Main Building and Executive Wing areas, and six AHUs, called Interior AHUs, for the interior of Main...

Cui, Y.; Liu, M.

2005-01-01T23:59:59.000Z

20

Advanced Energy Retrofit Guide Office Buildings  

SciTech Connect (OSTI)

The Advanced Energy Retrofit Guide for Office Buildings is a component of the Department of Energy’s Advanced Energy Retrofit Guides for Existing Buildings series. The aim of the guides is to facilitate a rapid escalation in the number of energy efficiency projects in existing buildings and to enhance the quality and depth of those projects. By presenting general project planning guidance as well as financial payback metrics for the most common energy efficiency measures, these guides provide a practical roadmap to effectively planning and implementing performance improvements for existing buildings.

Liu, Guopeng; Liu, Bing; Wang, Weimin; Zhang, Jian; Athalye, Rahul A.; Moser, Dave; Crowe, Eliot; Bengtson, Nick; Effinger, Mark; Webster, Lia; Hatten, Mike

2011-09-27T23:59:59.000Z

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

City of Jacksonville- Sustainable Public Buildings  

Broader source: Energy.gov [DOE]

In 2009, the Jacksonville City Office of Sustainability Initiatives announced the creation of the Sustainable Building Program. As part of the program, all new city-owned buildings must meet...

22

Office Buildings: Developer's Requirements- Consultant's Solutions  

E-Print Network [OSTI]

Ein Kooperationsvortrag von Office Buildings: Developer?s Requirements ? Consultant?s Solutions Dipl.-Ing. (TU) Jens Arndt Vivico Real Estate GmbH, Frankfurt a. M., Germany Dipl.-Ing. (TU) Peter Forster Ebert-Ingenieure Berlin GmbH 8. Kongress f...?r Geb?ude- und Betriebsoptimierung - ICEBO?08 October 20/21/22 2008 ESL-IC-08-10-35a Proceedings of the Eighth International Conference for Enhanced Building Operations, Berlin, Germany, October 20-22, 2008 Seite 2 Dipl.-Ing (TU) Jens Arndt; Vivico...

Forster, P.; Arndt, J.

23

Office Buildings: Assessing and Reducing Plug and Process Loads in Office Buildings (Fact Sheet)  

SciTech Connect (OSTI)

Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly large fraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use in office spaces are poorly understood.

Not Available

2013-04-01T23:59:59.000Z

24

Building Technologies Program: Building America Publications  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orA BRIEFAprilBudgetAbout » Building Technologies

25

Energy Conservation in Public Buildings  

Broader source: Energy.gov [DOE]

The Florida Energy Conservation and Sustainable Buildings Act requires the use of energy-efficient equipment and design, and solar energy devices for heating and cooling state buildings where life...

26

Green Campus Committee 2009/2010 Buildings & Estates Office  

E-Print Network [OSTI]

Green Campus Committee 2009/2010 Buildings & Estates Office Barrie Curley Maurice Ahern, Stephan An Taisce Ellen Murphy, Green Schools Development Officer Birgit O'Driscoll, Green Schools Development

Schellekens, Michel P.

27

Measured energy performance of a US-China demonstration energy-efficient office building  

E-Print Network [OSTI]

and Renewable Energy, Office of Building Technology,and Renewable Energy, Office of Building Technology,and renewable energy improvements to the building. One of

Xu, Peng; Huang, Joe; Jin, Ruidong; Yang, Guoxiong

2006-01-01T23:59:59.000Z

28

Measured energy performance of a US-China demonstration energy-efficient office building  

E-Print Network [OSTI]

China demonstration energy- efficient commercial building”,China Demonstration Energy Efficient Office Building insideUS-China demonstration energy-efficient office building Peng

Xu, Peng; Huang, Joe; Jin, Ruidong; Yang, Guoxiong

2006-01-01T23:59:59.000Z

29

OFFICE OF STUDENT FINANCIAL AID 0102 Lee Building  

E-Print Network [OSTI]

11PASSET OFFICE OF STUDENT FINANCIAL AID 0102 Lee Building College Park, Maryland 20742-5145 TEL, other securities. $ $ Business and Investment Farm. Include the market value of land, buildings

Milchberg, Howard

30

OFFICE OF STUDENT FINANCIAL AID 0102 Lee Building  

E-Print Network [OSTI]

11SASSET OFFICE OF STUDENT FINANCIAL AID 0102 Lee Building College Park, Maryland 20742-5145 TEL and Investment Farm. Include the market value of land, buildings, machinery, equipment, inventory, etc. Do

Milchberg, Howard

31

2013 Building Technologies Office Program Peer Review Report...  

Broader source: Energy.gov (indexed) [DOE]

(SOM) used EnergyPlus to design a new 380,000 square foot federal office building in West Virginia. The building has an advanced ventilated double facade and uses low-energy...

32

Green Energy Technology in Public Buildings  

Broader source: Energy.gov [DOE]

Enacted in June 2007, [http://www.leg.state.or.us/07reg/measpdf/hb2600.dir/hb2620.en.pdf House Bill 2620] introduced a unique requirement for installing solar energy systems on public buildings. In...

33

Public Parking > Agriculture Building Parkade**  

E-Print Network [OSTI]

Engineering Poultry Science Kirk Hall Agriculture Agriculture and Agri-Food Canada SCIENCE PLACE VETERINARY > Agriculture Building Parkade** > Pay Parking Lots** > Stadium Parkade** > Diefenbaker Lot > Health Sciences Parkade** Disabled Persons' Parking* Motorcyle Parking* Faculty & Sta Parking Lots* Student Parking Lots

Saskatchewan, University of

34

Archive Reference Buildings by Building Type: Large office  

Office of Energy Efficiency and Renewable Energy (EERE)

Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

35

Archive Reference Buildings by Building Type: Small office  

Broader source: Energy.gov [DOE]

Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

36

Live Webinar on Better Buildings Challenge: Public-Sector Update  

Broader source: Energy.gov [DOE]

The Energy Department will present a live webinar titled "Better Buildings Challenge: Public-Sector Update."

37

Office of the Vice President for Research 203 Administration Building  

E-Print Network [OSTI]

Office of the Vice President for Research 203 Administration Building Fort Collins, Colorado 80523 of the Vice President for Research. The Institute builds on the long history of broad work in energy at the Powerhouse Energy Institute (when that building is completed in 2014) and Engines & Energy Conversion

38

Post Office Building, Rancho Mirage, California | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Post Office in California The U.S. Postal Service (USPS) has been making an effort to add solar power to its offices as part of the Million Solar Roofs Initiative. They have been...

39

Case Study of Continuous Commissioning in an Office Building  

E-Print Network [OSTI]

ICEBO2006, Shenzhen, China Building Commissioning for Energy Efficiency and Comfort, Vol.VI-9-3 Case Study of Continuous Commissioning? in an Office Building Xiufeng Pang Bin Zheng Mingsheng Liu Graduate Student Graduate...&M University examined system operations in a number of newly retrofitted buildings and found that optimizing the system can double energy savings and improve building comfort [Liu et al.]. In 1996, the CC? process was first developed. While most...

Pang, X.; Zheng, B.; Liu, M.

2006-01-01T23:59:59.000Z

40

Archived Reference Building Type: Medium office  

Broader source: Energy.gov [DOE]

Here you will find past versions of the commercial reference building models for existing buildings constructed in or after 1980, organized by building type and location. A summary of building types and climate zones is available for reference. Current versions are also available.

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Office of International Education Savant Building, Suite 211  

E-Print Network [OSTI]

Office of International Education Savant Building, Suite 211 Atlanta, Georgia 30332-0284 PHONE: 404 Participant FROM: Stephanie Bullard Education Abroad Assistant, Office of International Education RE that GT programs do not currently sponsor. If you intend to transfer credit back to GT for courses your

Li, Mo

42

Archived Reference Building Type: Medium office  

Broader source: Energy.gov [DOE]

Here you will find past versions of the commercial reference building models for existing buildings constructed before 1980, organized by building type and location. A summary ofbuilding types and climate zones is available for reference. Current versions are also available.

43

Evaluating Energy Savings in All-Electric Public Housing in the Pacific Northwest (Fact Sheet), Building America Case Study: Whole-House Solutions for New and Existing Homes, Building Technologies Office (BTO)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit|Department of Energy EnvironmentalRestrictions on FormerBehaviors:and

44

Energy Consumption Analyses of Frequently-used HVAC System Types in High Performance Office Buildings.  

E-Print Network [OSTI]

??The high energy consumption of heating, ventilation and air-conditioning (HVAC) systems in commercial buildings is a hot topic. Office buildings, a typical building set of… (more)

Yan, Liusheng

2014-01-01T23:59:59.000Z

45

On Variations of Space-heating Energy Use in Office Buildings  

E-Print Network [OSTI]

simulation results with the building databases forthe large office building in Chicago. Figure 9.simulation results with the building databases for the small

Lin, Hung-Wen

2014-01-01T23:59:59.000Z

46

OSTI Publications | OSTI, US Dept of Energy, Office of Scientific...  

Office of Scientific and Technical Information (OSTI)

OSTI Publications October 2014 Office of Scientific and Technical Information 2015-2019 Strategic Plan (922-KB PDF) The U.S. Department of Energy Office of Scientific and Technical...

47

Building Technologies Office: 179D DOE Calculator  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

or 0.60ft for a partially qualifying property for envelope, heating, ventilating, and air conditioning (HVAC), or lighting improvements. In addition, a building may qualify...

48

Using Qualified Energy Conservation Bonds for Public Building...  

Broader source: Energy.gov (indexed) [DOE]

Using Qualified Energy Conservation Bonds for Public Building Upgrades: Reducing Energy Bills in the City of Philadelphia Using Qualified Energy Conservation Bonds for Public...

49

Smarter Buildings Survey Consumers Rank Their Office Buildings  

E-Print Network [OSTI]

of all electricity in the US is consumed by buildings ­ and up to 50 percent of that is wasted will be the single largest energy consumers and emitters of greenhouse gasses on our planet. The skyscrapers and building portfolios: · Operational costs. The combined effect of rising energy costs and a dwindling global

50

STIL2 Swedish Office Buildings Survey - Offices_Sweden_-20100409...  

Open Energy Info (EERE)

resource type file revision id 76f29d91-6c61-47c0-a681-83ba0b26cb01 size 1.4 MiB state active url type upload Resources OfficesSweden-20100409.... Social Google+ Twitter Facebook...

51

Reference Buildings by Building Type: Medium office | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L dDepartmentnews-flashes Office ofofDepartment ofofofMedium office

52

Office of Student Financial Aid Master of Public Health  

E-Print Network [OSTI]

,184 Books & Supplies 1,200 1,200 Room & Board (off campus) 9,990 9,990 Miscellaneous 2,556 2,556 Health careOffice of Student Financial Aid Master of Public Health Eligibility In order to receive loan funds and/or work-study assistance through the Office of Student Financial Aid, a master of public health

Wisconsin at Madison, University of

53

Building Technologies Office | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power Systems EngineeringDepartment of4 Federal6Clean Energy |-FormerofBuilding RemovalBuilding

54

Reference Buildings by Building Type: Large office | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L dDepartmentnews-flashes Office ofofDepartment ofofof

55

Building Load Simulation and Validation of an Office Building  

E-Print Network [OSTI]

of the model for electricity use were calibrated to match the actual electricity use for the average year of the available data for years 1998, 1999, and 2000. The monthly and annual cooling loads of the building were calculated by using the DOE2.1E. The extra...

Alghimlas, F.

2002-01-01T23:59:59.000Z

56

Reference Buildings by Building Type: Small office | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L dDepartmentnews-flashes Office ofofDepartmentHotel Reference

57

Building Technologies Office | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative Fuels Data CenterEnergyAuthorizationSunShotAppealsBudgetEnergyBuilding

58

A Look at Office Buildings - Index  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelinesProved Reserves (Billion Cubic Feet)WyomingSquareEnd-Use EquipmentJulyOffice Home: A

59

Technical and Energy Assessment of Building Integrated Photovoltaic Systems applied to the UAE Office Buildings  

E-Print Network [OSTI]

Technical and Energy Assessment of Building Integrated Photovoltaic Systems applied to the UAE Office Buildings Hassan Radhi Assistant Professor College of Engineering UAE University Al-Ain, United Arab Emirates ABSTRACT In the market... due to the PV panels represents an important factor when the EPBT is estimated Keywords: BiPV, embodied energy, UAE commercial buildings. INTRODUCTION Developments in the design and manufacture of photovoltaic cells have recently been a...

Radhi, H.

2010-01-01T23:59:59.000Z

60

Offices and dwellings: what building acoustics for sustainable development?  

E-Print Network [OSTI]

Offices and dwellings: what building acoustics for sustainable development? M. Asselineau, A.asselineau@peutz.fr Proceedings of the Acoustics 2012 Nantes Conference 23-27 April 2012, Nantes, France 3211 #12;Sustainability for sustainable projects as defined in the French standards, one specifically deals with acoustic comfort. Over

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Radiological Laboratory, Utility, Office Building LEED Strategy & Achievement  

SciTech Connect (OSTI)

Missions that the Radiological Laboratory, utility, Office Building (RLUOB) supports are: (1) Nuclear Materials Handling, Processing, and Fabrication; (2) Stockpile Management; (3) Materials and Manufacturing Technologies; (4) Nonproliferation Programs; (5) Waste Management Activities - Environmental Programs; and (6) Materials Disposition. The key capabilities are actinide analytical chemistry and material characterization.

Seguin, Nicole R. [Los Alamos National Laboratory

2012-07-18T23:59:59.000Z

62

building tech office | netl.doe.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched5 Industrial Carbon Capture and Storage Clean Coal Power Initiative PowerBuilding

63

City of Scottsdale- Green Building Policy for Public Buildings  

Broader source: Energy.gov [DOE]

In 2005, Scottsdale approved a green building policy for new city buildings and remodels. The resolution requires all new, occupied city buildings of any size to be designed, contracted and built...

64

Measured energy performance of a US-China demonstration energy-efficient office building  

E-Print Network [OSTI]

an energy-efficient demonstration building and design centerenergy- efficient demonstration office building and designenergy-efficient materials, space-conditioning systems, controls, and design

Xu, Peng; Huang, Joe; Jin, Ruidong; Yang, Guoxiong

2006-01-01T23:59:59.000Z

65

Field Analysis of Thermal Comfort in Two Energy Efficient Office Buildings in Malaysia  

E-Print Network [OSTI]

the effectiveness of tropical passive solar control components in integrating thermal comfort with energy efficiency in office building. Field measurements are carried out in selected workspace of two office buildings that have been practiced the passive solar...

Qahtan, A. T.; Keumala, N.; Rao, S. P.; Samad, Z. A.

2010-01-01T23:59:59.000Z

66

Demand Relief and Weather Sensitivity in Large California Commercial Office Buildings  

E-Print Network [OSTI]

implemented or are under consideration. Historically, the target customers have been large industrial users who can reduce the equivalent load of several large office buildings. While the individual load reduction from an individual office building may be less...

Kinney, S.; Piette, M. A.; Gu, L.; Haves, P.

2001-01-01T23:59:59.000Z

67

Managing Energy in San Antonio Public Buildings  

E-Print Network [OSTI]

,125 electric 885 water 4 steam/CHW ESL-KT-13-12-27 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 Public Buildings: By the Numbers 7Se p 2 007 Ma r 2 008 Se p 2 008 Ma r 2 009 Se p 2 009 Ma r 2 010 Se p 2 010 Ma r 2... Energy Consumption Electricity Natural Gas Ele ctr icit y C on sum pti on (k Wh ) Ga s C on sum pti on (C CF ) 7 year low -4% vs. 2012 ESL-KT-13-12-27 CATEE 2013: Clean Air Through Energy Efficiency Conference, San Antonio, Texas Dec. 16-18 8 M uni cip...

Gates, P.

2013-01-01T23:59:59.000Z

68

DOE standard compliance demonstration program: An office building example  

SciTech Connect (OSTI)

The US Department of Energy (DOE) issued interim new building energy standards (10 CFR 435 1989) to achieve maximum energy efficiency in the designs of new buildings. DOE then entered into a project to demonstrate and assess the impact of these standards on the design community. One area of focus was a test to see how a less conventional design-focused building would meet the standards` requirements -- DOE wanted to demonstrate that compliance with energy standards does not mean compromising the architectural intent of a building. This study, which was initiated at Pacific Northwest Laboratory (PNL), illustrated the process by which compliance with the standards can be proven for a highly {open_quotes}design-oriented{close_quotes} office building. The study also assessed the impact of the whole building simulation compliance alternatives on design. This report documents the compliance requirements, gives a description of the sample building chosen for the study, provides general guidance for the compliance process, documents the method of compliance that was undertaken for the sample building, presents the results of the study, and provides a recommendation on how the compliance requirements could be improved to reflect more realistic use types.

Bailey, S.A.; Keller, J.M.; Wrench, L.E.; Williams, C.J.

1993-06-01T23:59:59.000Z

69

Anaheim Public Utilities- Green Building and New Construction Rebate Program  

Broader source: Energy.gov [DOE]

Anaheim Public Utilities (APU) offers commercial, industrial, residential, and institutional customers the Green Building Incentives Program to offset construction, installation and upgrade costs...

70

Building-related risk factors and work-related lower respiratory symptoms in 80 office buildings  

SciTech Connect (OSTI)

We assessed building-related risk factors for lower respiratory symptoms in office workers. The National Institute for Occupational Safety and Health in 1993 collected data during indoor environmental health investigations of workplaces. We used multivariate logistic regression analyses to assess relationships between lower respiratory symptoms in office workers and risk factors plausibly related to microbiologic contamination. Among 2,435 occupants in 80 office buildings, frequent, work-related multiple lower respiratory symptoms were strongly associated, in multivariate models, with two risk factors for microbiologic contamination: poor pan drainage under cooling coils and debris in outside air intake. Associations tended to be stronger among those with a history of physician-diagnosed asthma. These findings suggest that adverse lower respiratory health effects from indoor work environments, although unusual, may occur in relation to poorly designed or maintained ventilation systems, particularly among previously diagnosed asthmatics. These findings require confirmation in more representative buildings.

Mendell, M.J.; Naco, G.M.; Wilcox, T.G.; Sieber, W.K.

2002-01-01T23:59:59.000Z

71

Office of Building Technologies evaluation and planning report  

SciTech Connect (OSTI)

The US Department of Energy (DOE) Office of Building Technologies (OBT) encourages increased efficiency of energy use in the buildings sector through the conduct of a comprehensive research program, the transfer of research results to industry, and the implementation of DOE`s statutory responsibilities in the buildings area. The planning and direction of these activities require the development and maintenance of database and modeling capability, as well as the conduct of analyses. This report summarizes the results of evaluation and planning activities undertaken on behalf of OBT during the past several years. It provides historical data on energy consumption patterns, prices, and building characteristics used in OBT`s planning processes, and summaries of selected recent OBT analysis activities.

Pierce, B.

1994-06-01T23:59:59.000Z

72

Residential Buildings Historical Publications reports, data and...  

Gasoline and Diesel Fuel Update (EIA)

0 Average Electricity Residential Buildings Consumption Expenditures per Total per Square per per per Total Total Floorspace Building Foot per Household per Square per Household...

73

Residential Buildings Historical Publications reports, data and...  

Gasoline and Diesel Fuel Update (EIA)

2001 Average Electricity Residential Buildings Consumption Expenditures per Total per Square per per per Total Total Floorspace Building Foot per Household per Square per Household...

74

Office of Public Affairs | The Ames Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeeding access1 Technical ConferenceOffice ofOffice ofOffice of

75

BREAKING WITH OR BUILDING ON THE PAST? REFORMING IRISH PUBLIC  

E-Print Network [OSTI]

of the application of new public management styles to Ireland. Particular attention is paid to the public serviceBREAKING WITH OR BUILDING ON THE PAST? REFORMING IRISH PUBLIC ADMINISTRATION: 1958-2008 Niamh? REFORMING IRISH PUBLIC ADMINISTRATION: 1958-2008 Niamh Hardiman and Muiris MacCarthaigh Working Papers

76

Building Technologies Office Program Peer Review | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless orA BRIEFAprilBudgetAbout » Building Technologies Office

77

An in-depth Analysis of Space Heating Energy Use in Office Buildings  

E-Print Network [OSTI]

. In this study, the prototypical small and large-size office buildings of the USDOE commercial reference is further benchmarked against those from similar office buildings in two U.S. commercial buildings databases is the largest one [USDOE]. The U.S. Energy Information Administration [EIA] 2003 Commercial Building Energy

78

A Look at Principal Building Activities in Commercial Buildings  

Gasoline and Diesel Fuel Update (EIA)

Buildings Home> Special Topics > 1995 Principal Building Activities Office Education Health Care Retail and Service Food Service Food Sales Lodging Religious Worship Public...

79

Scenario analysis of retrofit strategies for reducing energy consumption in Norwegian office buildings  

E-Print Network [OSTI]

Model buildings were created for simulation to describe typical office buildings from different construction periods. A simulation program was written to predict the annual energy consumption of the buildings in their ...

Engblom, Lisa A. (Lisa Allison)

2006-01-01T23:59:59.000Z

80

Field Test Results of Automated Demand Response in a Large Office Building  

E-Print Network [OSTI]

Building Control Strategies and Techniques for Demand Response,Automated Demand Response in a Large Office Building JunqiaoDemand Response Load Impacts: Evaluation of Baseline Load Models for Non-Residential Building

Han, Junqiao

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

U.S Department of Transportation Office of Public Affairs  

E-Print Network [OSTI]

U.S Department of Transportation Office of Public Affairs 1200 New Jersey Ave., S.E. Washington, DC Telephone: 202-366-0660 DOT Releases New Freight Transportation Data U.S. Department of Transportation, the most comprehensive publicly available data set of freight movement. "A transportation network

82

Office of Global Public Health www.globalhealth.utah.edu  

E-Print Network [OSTI]

Medicine Division of Public Health, 375 Chipeta Way Classroom 203 Or Join Us via GoToWebinar Please Register Here https://www3.gotomeeting.com/register/873018230 #12;Office of Global Public Health www Utilizing Social Services in Gujarat, India" Akiko Kamimura, PhD, MSW, MA Assistant Professor, Department

Tipple, Brett

83

National Petroleum Technology Office`s publication list for January--June 1998  

SciTech Connect (OSTI)

This report lists 20 publications and 19 computer software and supporting documentation that are available from the National Petroleum Technology Office. Publications relate to environmental management, field demonstrations, general research, reservoir characterization, and supporting research for the petroleum industry. Many of the computer codes are for the simulation of enhanced recovery techniques.

NONE

1998-07-01T23:59:59.000Z

84

ESCO Framework for Public/Federal Buildings  

E-Print Network [OSTI]

of the Eighth International Conference for Enhanced Building Operations, Berlin, Germany, October 20-22, 2008 Building Technologies ? Siemens 2008 Climate Change and Global Warming Not a new topic, but now with the right attention ! z z z z z z z z z z z z z z... z z No environmental awareness without economic interests Page 2 ESL-IC-08-10-01 Proceedings of the Eighth International Conference for Enhanced Building Operations, Berlin, Germany, October 20-22, 2008 SB T B A U /EE S ? Siemens 2008 Building...

Liehr, G.

85

Transcript of See Action and Technical Assistance Program Webcast: Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings  

Broader source: Energy.gov [DOE]

U.S. Department of Energy Office (DOE) of Energy Efficiency and Renewable Energy (EERE) transcript of See Action and Technical Assistance Program Webcast: Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings.

86

Energy Savings Modeling of Standard Commercial Building Re-tuning Measures: Large Office Buildings  

SciTech Connect (OSTI)

Today, many large commercial buildings use sophisticated building automation systems (BASs) to manage a wide range of building equipment. While the capabilities of BASs have increased over time, many buildings still do not fully use the BAS's capabilities and are not properly commissioned, operated or maintained, which leads to inefficient operation, increased energy use, and reduced lifetimes of the equipment. This report investigates the energy savings potential of several common HVAC system retuning measures on a typical large office building prototype model, using the Department of Energy's building energy modeling software, EnergyPlus. The baseline prototype model uses roughly as much energy as an average large office building in existing building stock, but does not utilize any re-tuning measures. Individual re-tuning measures simulated against this baseline include automatic schedule adjustments, damper minimum flow adjustments, thermostat adjustments, as well as dynamic resets (set points that change continuously with building and/or outdoor conditions) to static pressure, supply air temperature, condenser water temperature, chilled and hot water temperature, and chilled and hot water differential pressure set points. Six combinations of these individual measures have been formulated - each designed to conform to limitations to implementation of certain individual measures that might exist in typical buildings. All of these measures and combinations were simulated in 16 cities representative of specific U.S. climate zones. The modeling results suggest that the most effective energy savings measures are those that affect the demand-side of the building (air-systems and schedules). Many of the demand-side individual measures were capable of reducing annual HVAC system energy consumption by over 20% in most cities that were modeled. Supply side measures affecting HVAC plant conditions were only modestly successful (less than 5% annual HVAC energy savings for most cities for all measures). Combining many of the retuning measures revealed deep savings potential. Some of the more aggressive combinations revealed 35-75% reductions in annual HVAC energy consumption, depending on climate and building vintage.

Fernandez, Nicholas; Katipamula, Srinivas; Wang, Weimin; Huang, Yunzhi; Liu, Guopeng

2012-06-01T23:59:59.000Z

87

Studying the Building Blocks of Matter: Public Talk Planned for...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Studying the Building locks of Matter: Public Talk Planned for Oct. 7 at Jefferson Lab CEBAF Race Track This aerial photo shows the outline of the racetrack-shaped CEBAF...

88

Low to No Cost Strategy for Energy Efficiency in Public Buildings...  

Broader source: Energy.gov (indexed) [DOE]

Low to No Cost Strategy for Energy Efficiency in Public Buildings (Text Version) Low to No Cost Strategy for Energy Efficiency in Public Buildings (Text Version) Electronic Voice:...

89

Research and Application of RCF Technology in Public Building  

E-Print Network [OSTI]

, China, September 14-17, 2014 Research and Application of RCF Technology in Public Buildings 7. REFERENCES ASHRAE, 2013, “2013 Handbook-Fundamental, Thermal Comfort”, American Society of Heating, refrigeration and Air-Conditioning Engineers, Inc...Radiant Ceiling plus Fresh Air Research and Application of RCF Technology in Public Buildings ???????????? AirStar Air Conditioning Technology Group (HK) Ltd ?????????? AirStar Environment Technology Group Ltd ?????????????? YanTong Zhu...

Yan, J.; Pan, D.

2014-01-01T23:59:59.000Z

90

Energy Efficiency Standards for Public Buildings  

Broader source: Energy.gov [DOE]

In May 2008, Idaho enacted HB 422 (the Energy Efficient State Building Act) to reduce the amount of energy consumed by state facilities. To the extent feasible and practical, all major facility...

91

Office of Global Public Health www.globalhealth.utah.edu  

E-Print Network [OSTI]

Way Classroom 203 Or Join Us via GoToWebinar Please Register Here https://www3.gotomeeting.com/register/873020982 #12; Office of Global Public Health.m. - 6:30 p.m. "Health, Well-being and Abuse History of Women Utilizing Social

Tipple, Brett

92

Increasing Federal Office Building Water Efficiency, Federal Energy Management Program (FEMP) (Fact Sheet)  

SciTech Connect (OSTI)

Quick guide to increasing Federal office building water efficiency, water management planning, performing a water audit, calculating a water balance, and best management practices.

Not Available

2010-04-01T23:59:59.000Z

93

THE PASSIVE SOLAR DESIGN PROCESS FOR A SMALL OFFICE/LABORATORY BUILDING  

E-Print Network [OSTI]

SOLAR DESIGN PROCESS FOR A SMALL OFFICE/LABORATORY BUILDING Brandt Andersson, Ron Kammerud, and Wayne Place October 1979 TWO-WEEK LOAN

Andersson, Brandt

2011-01-01T23:59:59.000Z

94

Rehabilitation for redevelopment : an approach to the conversion of old office buildings to housing  

E-Print Network [OSTI]

This thesis contends that the rehabilitation of existing building stock is a viable alternative to new construction in the production of housing. Principally, the thesis proposes that old office buildings, built between ...

Hellinghausen, D. Michael

1984-01-01T23:59:59.000Z

95

Estimating Total Energy Consumption and Emissions of China's Commercial and Office Buildings  

E-Print Network [OSTI]

Case 25 Figure 9 CO2 Emissions from Commercial Buildings (27 Figure 12 CO2 Emissions by Sector (Primary Energy,16 Office Building CO2 Emissions (Reference Case, Primary

Fridley, David G.

2008-01-01T23:59:59.000Z

96

Technical Support Document: 50% Energy Savings for Small Office Buildings  

SciTech Connect (OSTI)

The Technical Support Document (TSD) for 50% energy savings in small office buildings documents the analysis and results for a recommended package of energy efficiency measures (EEMs) referred to as the advanced EEMs. These are changes to a building design that will reduce energy usage. The package of advanced EEMs achieves a minimum of 50% energy savings and a construction area weighted average energy savings of 56.6% over the ANSI/ASHRAE/IESNA Standard 90.1-2004 for 16 cities which represent the full range of climate zones in the United States. The 50% goal is for site energy usage reduction. The weighted average is based on data on the building area of construction in the various climate locations. Cost-effectiveness of the EEMs is determined showing an average simple payback of 6.7 years for all 16 climate locations. An alternative set of results is provided which includes a variable air volume HVAC system that achieves at least 50% energy savings in 7 of the 16 climate zones with a construction area weighted average savings of 48.5%. Other packages of EEMs may also achieve 50% energy savings; this report does not consider all alternatives but rather presents at least one way to reach the goal. Design teams using this TSD should follow an integrated design approach and utilize additional analysis to evaluate the specific conditions of a project.

Thornton, Brian A.; Wang, Weimin; Huang, Yunzhi; Lane, Michael D.; Liu, Bing

2010-04-30T23:59:59.000Z

97

Next Location Prediction Within a Smart Office Building Jan Petzold, Faruk Bagci, Wolfgang Trumler, and Theo Ungerer  

E-Print Network [OSTI]

Next Location Prediction Within a Smart Office Building Jan Petzold, Faruk Bagci, Wolfgang Trumler is notified about the probable next location of an absent office owner within a smart office building the efficiency of several prediction methods. The scenario concerns employees in an office building visiting

Vintan, Lucian N.

98

Doing Well By Doing Good? Green Office Buildings  

E-Print Network [OSTI]

and Financial Benefits of Green Buildings , October 2003.average quality of the green buildings is somewhat higherquality of the non-green buildings in the clustered samples.

Eichholtz, Piet; Kok, Nils; Quigley, John M.

2009-01-01T23:59:59.000Z

99

Doing Well By Doing Good? Green Office Buildings  

E-Print Network [OSTI]

pp. 99-124. California’s Sustainable Building Taskforce.Benefits of Green Buildings , October 2003. Eichholtz, Pietin a Name? Reputation Building and Corporate Strategy." The

Eichholtz, Piet; Kok, Nils; Quigley, John M.

2009-01-01T23:59:59.000Z

100

Category:Buildings Publications | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergyCTBarreis aCallahanWind Farm JumpBLM) Lease. Add.png Add aNDGo

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls  

Broader source: Energy.gov [DOE]

Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls Webinar.

102

Technical basis for radiological release of Grand Junction Office Building 2. Volume 2, dose assessment supporting data  

SciTech Connect (OSTI)

The second volume of the Grand Junction Office Action Program Technical Basis for Radiological Release of Grand Junction Office Building 2 report includes the data quality objectives (DQO), sampling plan, collected data, and analysis used to model future radiation doses to members of the public occupying Building 2 on the U.S. Department of Energy (DOE) Grand Junction Office (GJO) site. This volume was assembled by extracting relevant components of the Grand Junction Projects Office Remedial Action Project Building 2 Public Dose Evaluation (DOE 1996) and inserting recent additional data that was gathered and dose pathway modeling that was performed. The intent of this document is to provide all derived guidance decisions, assumptions, measured data, testing results, and pathway modeling software input and output data that supports the discussion and determinations presented in Volume 1 of this report. For constructive employment of this document, the reader is encouraged to closely follow Volume 1 for proper association with the segment of information being examined.

NONE

1997-07-01T23:59:59.000Z

103

Energy efficiency in public buildings through ICT based control and monitoring systems  

E-Print Network [OSTI]

Energy efficiency in public buildings through ICT based control and monitoring systems G, France Keywords: energy efficiency, existing public buildings, control strategies, dynamic simulations a project entitled "Smart Energy Efficient Middleware for Public Spaces" (SEEMPubS). The project addresses

Paris-Sud XI, Université de

104

Technical Support Document: 50% Energy Savings Design Technology Packages for Medium Office Buildings  

SciTech Connect (OSTI)

This Technical Support Document (TSD) describes the process and methodology for development of the Advanced Energy Design Guide for Medium Offices (AEDG-MO or the Guide), a design guidance document which intends to provide recommendations for achieving 50% energy savings in medium office buildings that just meet the requirements of ANSI/ASHRAE/IESNA Standard 90.1-2004, Energy Standard for Buildings Except Low-Rise Residential Buildings.

Thornton, Brian A.; Wang, Weimin; Lane, Michael D.; Rosenberg, Michael I.; Liu, Bing

2009-09-01T23:59:59.000Z

105

Monitored Performance of an Office Building with an Under-floor Air Distribution System  

E-Print Network [OSTI]

- conditioning equipment was assessed and energy and ventilation improvements suggested. The building was found to fall within good practice and standard practice for energy usage in air-conditioned commercial office buildings for the United Kingdom.... However, if not installed or designed properly, these systems can use as much or more energy than a conventional HVAC system. The results of long-term monitoring and short-term measurements in a commercial office building with a UFAD are presented...

Walker, C.; Norford, L.

2005-01-01T23:59:59.000Z

106

Form:Buildings Publication | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublicIDAPowerPlantSitingConstruction.pdfNotify98.pdf JumpFlix SolarBlackFluvanna3°,Forestville,D JumpThis is

107

Data Visualization for Quality-Check Purposes of Monitored Electricity Consumption in All Office Buildings in the ESL Database  

E-Print Network [OSTI]

This report comprises an effort to visualize the monitored electricity consumption in all office buildings (not including the office buildings comprising other functions as classrooms and laboratories, for instance) in the ESL database. This data...

Sreshthaputra, A.; Abushakra, B.; Haberl, J. S.; Claridge, D. E.

2000-01-01T23:59:59.000Z

108

Doing Well by Doing Good? Green Office Buildings  

E-Print Network [OSTI]

dummy variables, one for each green building in the sample.dummy variables, one for each green building in the sample.nificantly higher for green buildings than for the most “

Eichholtz, Piet; Kok, Nils; Quigley, John M.

2009-01-01T23:59:59.000Z

109

Doing Well by Doing Good? Green Office Buildings  

E-Print Network [OSTI]

clusters as distinct. That is, 694 rated buildings and7,411 control buildings, each located within 1,300feet of a rated building. VOL. 100 NO. 5 EICHHOLTZ ET AL. :

Eichholtz, Piet; Kok, Nils; Quigley, John M.

2009-01-01T23:59:59.000Z

110

Doing Well By Doing Good? Green Office Buildings  

E-Print Network [OSTI]

sustainability, energy efficiency, green labels, real estateestate, the evidence on energy savings in green buildings isin Energy and Environmental Design”) green building rating

Eichholtz, Piet; Kok, Nils; Quigley, John M.

2009-01-01T23:59:59.000Z

111

Doing Well by Doing Good? Green Office Buildings  

E-Print Network [OSTI]

Sustainable Building Task Force. http://www.ciwmb.ca.gov/Greenbuilding/Design/Design”) green building rating system to encourage the “adoption of sustainable

Eichholtz, Piet; Kok, Nils; Quigley, John M.

2009-01-01T23:59:59.000Z

112

Simulated Energy Savings Comparison Between Two Continuous Commissioning® Methods Applied to a Retrofitted Office Building  

E-Print Network [OSTI]

The 8 th International Conference for Enhanced Building Operations (ICEBO 2008) October 20-22, 2008, Berlin, Germany Simulated Energy Savings Comparison Between Two Continuous Commissioning ? Methods Applied to a Retrofitted Office Building... and the cold and hot 1 ESL-IC-08-10-30 Proceedings of the Eighth International Conference for Enhanced Building Operations, Berlin, Germany, October 20-22, 2008 The 8 th International Conference for Enhanced Building Operations (ICEBO 2008) October 20...

Texas A& M Campus Building CC® Team

113

E-Print Network 3.0 - administration public buildings Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

search results for: administration public buildings Page: << < 1 2 3 4 5 > >> 1 Curriculum Vitae Eric Keller Austin Summary: Journal Articles: Building on place: A conceptual...

114

Publications | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched5 Industrial CarbonArticlesHuman Resources HumanOffice ofNP »U.S.Publications News

115

Simulation as a Tool to Develop Guidelines of Envelope Design of a Typical Office Building in Egypt  

E-Print Network [OSTI]

This paper describes the use of building performance simulation software in order to develop guidelines for designing energy-efficient office building. In Egypt energy codes for all building types are being under development. On the other hand...

Samaan, M.M.; Ahmed, A.N.; Farag, O.M.A.; El-Sayed Khalil, M.

2011-01-01T23:59:59.000Z

116

Database Aids Building Owners and Operators in Energy-Efficiency...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

The Building Technologies Office is conducting ongoing outreach to public and private organizations to contribute data. Collected data points include building location,...

117

Recommendations for 15% Above-Code Energy Efficiency Measures for Commercial Office Buildings  

E-Print Network [OSTI]

This report presents detailed information about the recommendations for achieving 15% above-code energy performance for commercial office buildings complying with ASHRAE Standard 90.1-19991. To accomplish the 15% annual energy consumption reductions...

Montgomery, C.; Yazdani, B.; Haberl, J. S.; Culp, C.; Liu, Z.; Mukhopadhyay, J.; Cho, S.

118

Commissioning of A Large Office Building in Texas - A Case Study  

E-Print Network [OSTI]

This case study involves commissioning of a large office building in the hot and humid climate of south Texas. The commissioning involved the installation of a VFD (Variable Frequency Drive) on a chilled water pump, improved EMCS (Energy Management...

Deng, S.; Turner, W. D.; Liu, M.

2000-01-01T23:59:59.000Z

119

E-Print Network 3.0 - air-conditioned office buildings Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

from 6:00 a.m. to 2... Bachman Hall Multi-Purpose Building ... Source: Hawaii Natural Energy Institute Collection: Renewable Energy 13 UNITED STATES PATENT AND TRADEMARK OFFICE...

120

NREL Technical Reports Guide the Way to 50% Energy Savings in Hospitals, Office Buildings (Fact Sheet)  

SciTech Connect (OSTI)

Researchers at the National Renewable Energy Laboratory (NREL) have developed two technical reports that provide recommendations to help designers and operators of large office buildings and hospitals achieve at least a 50% energy savings using existing technology.

Not Available

2011-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

USING DISPLAY ENERGY CERTIFICATES TO QUANTIFY PUBLIC SECTOR OFFICE ENERGY CONSUMPTION  

E-Print Network [OSTI]

This paper explores how internal and external characteristics affect energy use in the public sector office stock in England and Wales, using a database of 2,600 Display Energy Certificates (DECs) combined with other sources of disaggregated office...

Armitage, Peter; Godoy-Shimizu, Daniel; Steemers, Koen; Chenvidyakarn, Torwong

2014-11-05T23:59:59.000Z

122

Effective O&M Policy in Public Buildings | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

& Publications Preparing for the Arrival of Electric Vehicle Low-to-No Cost Strategy for Energy Efficiency in Public Buildings Energy Code Compliance and Enforcement Best...

123

Low-to-No Cost Strategy for Energy Efficiency in Public Buildings...  

Broader source: Energy.gov (indexed) [DOE]

Low-to-No Cost Strategy for Energy Efficiency in Public Buildings Low-to-No Cost Strategy for Energy Efficiency in Public Buildings Blue version of the EERE PowerPoint template,...

124

Simulation- Assisted Audit of an Air Conditioned Office Building  

E-Print Network [OSTI]

Conference for Enhanced Building Operations, Berlin, Germany, October 20-22, 2008 performances of the installation. Finally, some significant retrofit opportunities are proposed. BUILDING DESCRIPTION Building design The considered building is an existing... Conference for Enhanced Building Operations, Berlin, Germany, October 20-22, 2008 In nominal heating conditions (outdoor : -10?C/RH 90%; indoor : 20?C/RH50%), with ?t = 30 K, this gives a sensible power demand of: g1843g4662g3046,g3041g3042g3040 =g343623...

Bertagnolio, S.; Lebrun, J.; Hannay, J.; Silva, C. A.

125

Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls (Text Version)  

Broader source: Energy.gov [DOE]

Transcript of the webinar, "Procuring and Implementing Solar Projects on Public Buildings: How to Avoid Common Pitfalls."

126

Case Study of Energy Diagnose and Re-commissioning in a Green Office Building  

E-Print Network [OSTI]

systems' efficiency and bridge the gap between acceptance and management phase, finally realize a real green building. In this paper, it presents a case study result of applying this approach in a green office building in Beijing and shows how re...

Zhang, Y.; Wei, Q.

2006-01-01T23:59:59.000Z

127

THE PASSIVE SOLAR DESIGN PROCESS FOR A SMALL OFFICE/LABORATORY BUILDING  

E-Print Network [OSTI]

PASSIVE SOLAR DESIGN PROCESS FOR A SMALL OFFICE/LABORATORY BUILDINGpassive solar buildings will be built in the corning years. Thei r designdesign; and (3) development of building energy analysis programs which can evalu- ate the thermal and daylighting performance of passive solar

Andersson, Brandt

2011-01-01T23:59:59.000Z

128

Detailed Energy Data Collection for Miscellaneous and Electronic Loads in a Commercial Office Building  

E-Print Network [OSTI]

Detailed Energy Data Collection for Miscellaneous and Electronic Loads in a Commercial Office Miscellaneous and electronic loads (MELs) consume about 20% of the primary energy used in U.S. buildings and accurate data to inform MELs energy use. Introduction Background Buildings account for 40% of the total

Culler, David E.

129

The Post-occupancy Performance of Green Office Buildings: Evidence for the Fiekd  

E-Print Network [OSTI]

The Post-occupancy Performance of Green Office Buildings Evidence from the field Guy Newsham Ph D and colleagues , . . Introduction ? How do green buildings perform when occupied? ? Indoor Environment Quality Occupant Comfort and Well....nrc-cnrc.gc.ca/npsi/ctrl?action=rtdoc&an=20857897&article=0&fd=pdf ?Do ?green? buildings have better indoor environments? New evidence?, Building Research & Information: http://dx.doi.org/10.1080/09613218.2013.789951 Field study stud ? Four sources of data from each building: ? On...

Newsham, G.

2013-01-01T23:59:59.000Z

130

Lessons Learned from Continuous Commissioning of the Robert E. Johnson State Office Building, Austin, TX  

E-Print Network [OSTI]

ESL-TR-08-08-03 Lessons Learned from Continuous Commissioning ® of the Robert E. Johnson State Office Building, Austin, TX Submitted to Lawrence Berkeley National Laboratory By David Claridge, Ph.D., P.E. John Bynum Energy....5% annual lighting energy savings or 5.6% annual whole building energy savings based on a DOE-2 simulation analysis. Three main lessons were learned from the experience with the Robert E. Johnson building: • The traditional design...

Bynum, J.; Claridge, D. E.

2008-09-22T23:59:59.000Z

131

Prospects to Reduce the Use of Energy by 50% in Existing Office Buildings  

E-Print Network [OSTI]

on input, i.e. building and ESL-IC-08-10-21 Proceedings of the Eighth International Conference for Enhanced Building Operations, Berlin, Germany, October 20-22, 2008 system data, present energy use, etc., gathered by the local consultants... of the Eighth International Conference for Enhanced Building Operations, Berlin, Germany, October 20-22, 2008 Figure 1. Pennf?ktaren with offices and restaurants in the centre of Stockholm. Figure 2. Prismahuset with lecture halls, laboratories...

Dalenback, J.; Abel, E.

132

Cold Air Distribution in Office Buildings: Technology Assessment for California  

E-Print Network [OSTI]

available. The cooling plant is an ice harvester designedused for ice making or for building cooling. During iceyears. The cooling plant is a Mueller ice harvester system

Bauman, F.S.

2008-01-01T23:59:59.000Z

133

Energy Survey and Energy Savings in an Office Building with Aid of Building Software.  

E-Print Network [OSTI]

?? Simulation is one of the best Analytical tools for Building Research .Energy Efficient Buildings are of great concern which is gaining importance steeply in… (more)

Lu, Yinghao

2008-01-01T23:59:59.000Z

134

Technical Support Document: Development of the Advanced Energy Design Guide for Small Office Buildings  

SciTech Connect (OSTI)

This Technical Support Document (TSD) describes the process and methodology for the development of the Advanced Energy Design Guide for Small Office Buildings (AEDG-SO), a design guidance document intended to provide recommendations for achieving 30% energy savings in small office buildings over levels contained in ANSI/ASHRAE/IESNA Standard 90.1-1999, Energy Standard for Buildings Except Low-Rise Residential Buildings. The AEDG-SO is the first in a series of guides being developed by a partnership of organizations, including the American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (ASHRAE), the American Institute of Architects (AIA), the Illuminating Engineering Society of North America (IESNA), the New Buildings Institute (NBI), and the U.S. Department of Energy (DOE). Each of the guides in the AEDG series will provide recommendations and user-friendly design assistance to designers, developers and owners of small commercial buildings that will encourage steady progress towards net-zero energy buildings. The guides will provide prescriptive recommendation packages that are capable of reaching the energy savings target for each climate zone in order to ease the burden of the design and construction of energy-efficient small commercial buildings The AEDG-SO was developed by an ASHRAE Special Project committee (SP-102) made up of representatives of each of the partner organizations in eight months. This TSD describes the charge given to the committee in developing the office guide and outlines the schedule of the development effort. The project committee developed two prototype office buildings (5,000 ft2 frame building and 20,000 ft2 two-story mass building) to represent the class of small office buildings and performed an energy simulation scoping study to determine the preliminary levels of efficiency necessary to meet the energy savings target. The simulation approach used by the project committee is documented in this TSD along with the characteristics of the prototype buildings. The prototype buildings were simulated in the same climate zones used by the prevailing energy codes and standards to evaluate energy savings. Prescriptive packages of recommendations presented in the guide by climate zone include enhanced envelope technologies, lighting and day lighting technologies and HVAC and SWH technologies. The report also documents the modeling assumptions used in the simulations for both the baseline and advanced buildings. Final efficiency recommendations for each climate zone are included, along with the results of the energy simulations indicating an average energy savings over all buildings and climates of approximately 38%.

Jarnagin, Ronald E.; Liu, Bing; Winiarski, David W.; McBride, Merle F.; Suharli, L.; Walden, D.

2006-11-30T23:59:59.000Z

135

On Variations of Space-heating Energy Use in Office Buildings  

SciTech Connect (OSTI)

Space heating is the largest energy end use, consuming more than 7 quintillion joules of site energy annually in the U.S. building sector. A few recent studies showed discrepancies in simulated space-heating energy use among different building energy modeling programs, and the simulated results are suspected to be underpredicting reality. While various uncertainties are associated with building simulations, especially when simulations are performed by different modelers using different simulation programs for buildings with different configurations, it is crucial to identify and evaluate key driving factors to space-heating energy use in order to support the design and operation of low-energy buildings. In this study, 10 design and operation parameters for space-heating systems of two prototypical office buildings in each of three U.S. heating climates are identified and evaluated, using building simulations with EnergyPlus, to determine the most influential parameters and their impacts on variations of space-heating energy use. The influence of annual weather change on space-heating energy is also investigated using 30-year actual weather data. The simulated space-heating energy use is further benchmarked against those from similar actual office buildings in two U.S. commercial-building databases to better understand the discrepancies between simulated and actual energy use. In summary, variations of both the simulated and actual space-heating energy use of office buildings in all three heating climates can be very large. However these variations are mostly driven by a few influential parameters related to building design and operation. The findings provide insights for building designers, owners, operators, and energy policy makers to make better decisions on energy-efficiency technologies to reduce space-heating energy use for both new and existing buildings.

Lin, Hung-Wen; Hong, Tianzhen

2013-05-01T23:59:59.000Z

136

United States Patent and Trademark Office Public Hearing on Use of the Patent System to Protect  

E-Print Network [OSTI]

United States Patent and Trademark Office Public Hearing on Use of the Patent System to Protect of Patents and Trademarks Location: San Jose Convention Center 408 Almaden Avenue San Jose, California #12;UNITED STATES PATENT AND TRADEMARK OFFICE Public Hearing on Patent Protection for Software

Shamos, Michael I.

137

How to Select Lighting Controls for Offices and Public Buildings |  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensional Subject:Groundto Apply for Weatherization Assistance Howtoto

138

Delaware Company Breathes New Life into Old Post Office Building...  

Broader source: Energy.gov (indexed) [DOE]

the company set out to create the new workspace. The long-term goal: Qualify for the U.S. Green Building Council's Leadership in Energy and Environmental Design (LEED) Platinum...

139

Doing Well by Doing Good? Green Office Buildings  

E-Print Network [OSTI]

estimated for a green building, or to Energy Star. 2008. “square foot) Green rating (1 = yes) Energy Star (1 = yes)square foot) Green rating (1 = yes) Energy Star (1 = yes)

Eichholtz, Piet; Kok, Nils; Quigley, John M.

2009-01-01T23:59:59.000Z

140

Cold Air Distribution in Office Buildings: Technology Assessment for California  

E-Print Network [OSTI]

During building cooling the chillers supply 42 °P water towith 42°P supply air always reduced cooling and totalpart-load) cooling with cold air supply. In most California

Bauman, F.S.

2008-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Assessing and Reducing Plug and Process Loads in Office Buildings (Brochure)  

SciTech Connect (OSTI)

Plug and process loads (PPLs) in commercial buildings account for almost 5% of U.S. primary energy consumption. Minimizing these loads is a primary challenge in the design and operation of an energy-efficient building. PPLs are not related to general lighting, heating, ventilation, cooling, and water heating, and typically do not provide comfort to the occupants. They use an increasingly large fraction of the building energy use pie because the number and variety of electrical devices have increased along with building system efficiency. Reducing PPLs is difficult because energy efficiency opportunities and the equipment needed to address PPL energy use in office spaces are poorly understood.

Not Available

2011-06-01T23:59:59.000Z

142

A systematic approach to energy efficiency retrofit solutions for exsisting office buildings  

E-Print Network [OSTI]

Institute of Energy Efficient and Sustainable Design and Building Prof. Dr.-Ing. Werner Lang Yunming Shao Prof. Dr.-Ing. Werner Lang Technical University of Munich, Germany 11/11/2014 A systematic approach to energy efficiency retrofit solutions... for existing office buildings ESL-IC-14-09-33 Proceedings of the 14th International Conference for Enhanced Building Operations, Beijing, China, September 14-17, 2014 Institute of Energy Efficient and Sustainable Design and Building Prof. Dr.-Ing. Werner Lang...

Shao,Y.

2014-01-01T23:59:59.000Z

143

Indoor environmental quality and ventilation in U.S. office buildings: A view of current issues  

SciTech Connect (OSTI)

Much of the current focus on indoor environmental quality and ventilation in US office buildings is a response to sick building syndrome and occupant complaints about building-related health symptoms, poor indoor air quality, and thermal discomfort. The authors know that serious ``sick-building`` problems occur in a significant number of US office buildings and that a significant proportion of the occupants in many normal (non-sick) buildings report building-related health symptoms. Concerns about the health effects of environmental tobacco smoke have also focused attention on the indoor environment. The major responses of industry and governments, underway at the present time, are to restrict smoking in offices, to attempt to reduce the emissions of indoor pollutants, and to improve the operation of heating, ventilating and air conditioning (HVAC) systems. Better air filtration, improved HVAC commissioning and maintenance, and increased provisions for individual control of HVAC are some of the improvements in HVAC that are currently being, evaluated. In the future, the potential for improved productivity and reduced airborne transmission of infectious disease may become the major driving force for improved indoor environments.

Fisk, W.J.

1994-11-01T23:59:59.000Z

144

Recommendations for 15% Above ASHRAE 90.1-2007 Code-Compliant Building Energy Efficiency Measures for Small Office Buildings  

E-Print Network [OSTI]

per 2009 IECC Section 501.2 15% Above-Code Analysis for Small Office, p.5 January 2012 Energy Systems Laboratory, Texas A&M University Table 1. Base-Case Building Description Building Type Number of occupants = 73 Gross Area (sq. ft.) PNNL...-19341 (Thornton et al. 2010) Aspect Ratio PNNL-19341 (Thornton et al. 2010) Square shape Number of Floors PNNL-19341 (Thornton et al. 2010) Floor-to-Floor Height (ft.) ASHRAE 90.1-1989 13.7.1 Floor-to-Ceiling Height = 9 ft Orientation PNNL-19341...

Kim, H.; Baltazar, J. C.; Haberl, J.; Yazdani, B.

2012-01-01T23:59:59.000Z

145

Measured Energy Use Indices for 27 Office Buildings  

E-Print Network [OSTI]

-building electricity, cooling and heating use, as well as the electricity used by the motor controls centers (i.e., fans, pumps, etc.) and the combined lights and receptacles. In this paper a comparative summary of the information is presented across all the sites...

Haberl, J. S.; Sreshthaputra, A.; Claridge, D. E.; Turner, W. D.; Harmon, K.; Kisselburgh, J.; Mase, R.

2001-01-01T23:59:59.000Z

146

Estimating Total Energy Consumption and Emissions of China's Commercial and Office Buildings  

SciTech Connect (OSTI)

Buildings represent an increasingly important component of China's total energy consumption mix. However, accurately assessing the total volume of energy consumed in buildings is difficult owing to deficiencies in China's statistical collection system and a lack of national surveys. Official statistics suggest that buildings account for about 19% of China's total energy consumption, while others estimate the proportion at 23%, rising to 30% over the next few years. In addition to operational energy, buildings embody the energy used in the in the mining, extraction, harvesting, processing, manufacturing and transport of building materials as well as the energy used in the construction and decommissioning of buildings. This embodied energy, along with a building's operational energy, constitutes the building's life-cycle energy and emissions footprint. This report first provides a review of international studies on commercial building life-cycle energy use from which data are derived to develop an assessment of Chinese commercial building life-cycle energy use, then examines in detail two cases for the development of office building operational energy consumption to 2020. Finally, the energy and emissions implications of the two cases are presented.

Fridley, David; Fridley, David G.; Zheng, Nina; Zhou, Nan

2008-03-01T23:59:59.000Z

147

Research on the Statistical Method of Energy Consumption for Public Buildings in China  

E-Print Network [OSTI]

The purpose of this research is to develop a national statistical system for energy consumption data for public buildings in China, in order to provide data support for building energy efficiency work. The framework for a national statistical system...

Chen, S.; Li, N.

2006-01-01T23:59:59.000Z

148

Building Technologies Office 2015 Program Peer Review | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top Five EEREDepartmentFebruaryResistanceBuilding EnergyEnergy 2015 Program

149

Building Technologies Office Load Control Strategies | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top Five EEREDepartmentFebruaryResistanceBuilding EnergyEnergy 2015

150

Building Technologies Office 2014 Program Peer Review | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsBSCmemo.pdf BSCmemo.pdfBiopower BasicsEmerging Technologies »FY'14Office

151

Building Thermal Envelope Systems and Materials (BTESM) progress report for DOE Office of Buildings Energy Research  

SciTech Connect (OSTI)

The Monthly Report of the Building Thermal Envelope Systems and Materials (BTESM) Program is a monthly update of both in-house ORNL projects and subcontract activities in the research areas of building materials, wall systems, foundations, roofs, building diagnostics, and research utilization and technology transfer. Presentations are not stand-alone paragraphs every month. Their principal values are the short-time lapse between accomplishment and reporting and their evolution over a period of several months.

Burn, G. (comp.)

1990-01-01T23:59:59.000Z

152

NIOSH (National Institute for Occupational Safety and Health) indoor air quality in office buildings  

SciTech Connect (OSTI)

A total of 356 indoor-air-quality health-hazard evaluations were completed by NIOSH from 1971 through December of 1985. Most of these studies concerned government and private office buildings where there were worker complaints. Worker complaints resulted from contamination from inside the building (19% of the cases), contamination from outside (11 percent), contamination from the building fabric (4%), biological contamination (5%), inadequate ventilation (50%), and unknown causes (11%). Health complaints addressed by investigative efforts included eye irritation, dry throat, headache, fatigue, sinus congestion, skin irritation, shortness of breath, cough, dizziness, and nausea.

Wallingford, K.M.

1987-01-01T23:59:59.000Z

153

Office of the General Counsel Building 460 P.O. Box 5000  

E-Print Network [OSTI]

Office of the General Counsel Building 460 P.O. Box 5000 Upton. NY 11973-5000 Phone 516 344-8629 EN of Energy WY;'W.bnl.gov Memo Date: September 30, 1999 To: George Malosh From: Gregory Fes~ Subject: DOE Te: As above stated #12;DEPARTMENT OF ENERGY TECHNOLOGY PARTNERSHIP 0!\\-1BUDS INTTIATIVE C01\\rf

154

Estimating Total Energy Consumption and Emissions of China's Commercial and Office Buildings  

E-Print Network [OSTI]

Geothermal Heat Pump Central AC by NG Electric water heaterwater heating Technologies Electric heater Gas boiler Coal Boiler Small cogen Stove District heating Heat pumpHeat Pump* *COP Reference Case Alternative Case Table 10 Office Buildings: Water Heating Efficiency Boiler Gas Boiler Small Cogen Electric Water Heater

Fridley, David G.

2008-01-01T23:59:59.000Z

155

VAV System Optimization through Continuous Commissioning in an Office Building  

E-Print Network [OSTI]

control Existing schedule: The existing control modulates the relief fan VFD to maintain the building pressure at its set-point (0.02 in.W.C). The relief damper is modulated according to the relief fan VFD speed. Table 3. Outside air damper.... AHU 2 serves the 3 rd , 4 th and 5 th floors. Both use similar control sequences, except that some parameter settings differ. The supply fans and relief fans have their respective VFD controls. One single-duct AHU system is shown in Figure 2...

Cho, Y.; Pang, X.; Liu, M.

2007-01-01T23:59:59.000Z

156

Building Technologies Office FY 2015 Budget At-A-Glance  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top Five EEREDepartmentFebruaryResistanceBuilding EnergyEnergy 2015 Program5

157

Building Technologies Office Overview - 2013 Peer Review | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top Five EEREDepartmentFebruaryResistanceBuilding EnergyEnergy 2015Energy

158

Environmental impacts of building integrated PV applications in the state public buildings sector  

SciTech Connect (OSTI)

If the US is to meet its commitments for CO{sub 2} and SO{sub 2} emission reductions, as anticipated by the 1997 Kyoto Protocol on Climate Change and the Clean air Act Amendments of 1990, it almost certainly must implement policies to increase the use of renewable energy. This paper evaluates the potential of photovoltaic (PV) technologies to deliver high-value electrical services while offsetting SO{sub 2} and CO{sub 2} emissions. Their study focuses on PV applications in the public buildings sector because of its potential for speeding the commercialization of the technology in a market conducive to long-term return on investment. The study investigates the economic and environmental implications of PV meeting 2% of the energy demand of public buildings. The specific application investigated is a roof-mounted dispatchable peak-shaving system with uninterruptible power supply (UPS) capability. Several previous studies have shown that such a system is cost-effective on the basis of the energy services it provides. The present analysis indicates that this application can play an important role in helping the US meet its CO{sub 2} and SO{sub 2} emissions targets.

Byrne, J.; Agbemabiese, L.; Kliesch, J.; Eiffert, P.; Hadjilambrinos, C.; Nigro, R.

1999-07-01T23:59:59.000Z

159

Evaluating Energy Performance and Improvement Potential of China Office Buildings in the Hot Humid Climate Against U.S. Reference Buildings: Preprint  

SciTech Connect (OSTI)

This study compares the building code standards for office buildings in hot humid climates of China and the USA. A benchmark office building model is developed for Guangzhou, China that meets China's minimum national and regional building codes with incorporation of common design and construction practices for the area. The Guangzhou office benchmark model is compared to the ASHRAE standard based US model for Houston, Texas which has similar climate conditions. The research further uses a building energy optimization tool to optimize the Chinese benchmark with existing US products to identify the primary areas for potential energy savings. The most significant energy-saving options are then presented as recommendations for potential improvements to current China building codes.

Herrman, L.; Deru, M.; Zhai, J.

2010-08-01T23:59:59.000Z

160

Revealing Occupancy Patterns in Office Buildings Through the use of Annual Occupancy Sensor Data  

SciTech Connect (OSTI)

Energy simulation programs like DOE-2 and EnergyPlus are tools that have been proven to aid with energy calculations to predict energy use in buildings. Some inputs to energy simulation models are relatively easy to find, including building size, orientation, construction materials, and HVAC system size and type. Others vary with time (e.g. weather and occupancy) and some can be a challenge to estimate in order to create an accurate simulation. In this paper, the analysis of occupancy sensor data for a large commercial, multi-tenant office building is presented. It details occupancy diversity factors for private offices and summarizes the same for open offices, hallways, conference rooms, break rooms, and restrooms in order to better inform energy simulation parameters. Long-term data were collected allowing results to be presented to show variations of occupancy diversity factors in private offices for time of day, day of the week, holidays, and month of the year. The diversity factors presented differ as much as 46% from those currently published in ASHRAE 90.1 2004 energy cost method guidelines, a document referenced by energy modelers regarding occupancy diversity factors for simulations. This may result in misleading simulation results and may introduce inefficiencies in the final equipment and systems design.

Carlos Duarte; Kevin Van Den Wymelenberg; Craig Rieger

2013-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Revealing Occupancy Patterns in an Office Building through the Use of Occupancy Sensor Data  

SciTech Connect (OSTI)

Energy simulation programs like DOE-2 and EnergyPlus are tools that have been proven to aid with energy calculations to predict energy use in buildings. Some inputs to energy simulation models are relatively easy to find, including building size, orientation, construction materials, and HVAC system size and type. Others vary with time (e.g. weather and occupancy) and some can be a challenge to estimate in order to create an accurate simulation. In this paper, the analysis of occupancy sensor data for a large commercial, multi-tenant office building is presented. It details occupancy diversity factors for private offices and summarizes the same for open offices, hallways, conference rooms, break rooms, and restrooms in order to better inform energy simulation parameters. Long-term data were collected allowing results to be presented to show variations of occupancy diversity factors in private offices for time of day, day of the week, holidays, and month of the year. The diversity factors presented differ as much as 46% from those currently published in ASHRAE 90.1 2004 energy cost method guidelines, a document referenced by energy modelers regarding occupancy diversity factors for simulations. This may result in misleading simulation results and may introduce inefficiencies in the final equipment and systems design.

Carlos Duarte; Kevin Van Den Wymelenberg; Craig Rieger

2013-12-01T23:59:59.000Z

162

Targeted Energy Efficiency Expert Evaluation (E4) Report: Iowa City Federal Building and U.S. Post Office, Iowa City, IA  

SciTech Connect (OSTI)

Final report summarizing Targeted E4 measures and energy savings analysis for the Iowa City Federal Building and Post Office.

Goddard, James K.; Fernandez, Nicholas; Underhill, Ronald M.; Gowri, Krishnan

2013-03-01T23:59:59.000Z

163

Analysis of Innovative HVAC System Technologies and Their Application for Office Buildings in Hot and Humid Climates  

E-Print Network [OSTI]

The commercial buildings sector in the United States used 18 percent (17.93 Quads) of the U.S. primary energy in 2006. Office buildings are the largest single energy consumption category in the commercial buildings sector of the United States...

Tanskyi, Oleksandr

2012-02-14T23:59:59.000Z

164

DOE/ NREL Build One of the World's Most Energy Efficient Office Spaces  

ScienceCinema (OSTI)

Technology ? from sophisticated computer modeling to advanced windows that actually open ? will help the newest building at the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) be one of the world's most energy efficient offices. Scheduled to open this summer, the 222,000 square-foot RSF will house more than 800 staff and an energy efficient information technology data center. Because 19 percent of the country's energy is used by commercial buildings, DOE plans to make this facility a showcase for energy efficiency. DOE hopes the design of the RSF will be replicated by the building industry and help reduce the nation's energy consumption by changing the way commercial buildings are designed and built.

None

2013-05-29T23:59:59.000Z

165

Plug-Load Control and Behavioral Change Research in GSA Office Buildings  

SciTech Connect (OSTI)

The U.S. General Services Administration (GSA) owns and leases over 354 million square feet (ft2) of space in over 9,600 buildings [1]. GSA is a leader among federal agencies in aggressively pursuing energy efficiency (EE) opportunities for its facilities and installing renewable energy (RE) systems to provide heating, cooling, and power to these facilities. According to several energy assessments of GSA's buildings conducted by the National Renewable Energy Laboratory (NREL), plug-loads account for approximately 21% of the total electricity consumed within a standard GSA Region 3 office building. This study aims to provide insight on how to effectively manage plug-load energy consumption and attain higher energy and cost savings for plug-loads. As GSA improves the efficiency of its building stock, plug-loads will become an even greater portion of its energy footprint.

Metzger, I.; Cutler, D.; Sheppy, M.

2012-10-01T23:59:59.000Z

166

An annotated bibliography of completed and in-progress behavioral research for the Office of Buildings and Community Systems. [About 1000 items, usually with abstracts  

SciTech Connect (OSTI)

This report provides an annotated bibliography of completed and in-progress consumer decision research useful for technology transfer and commercialization planning by the US Department of Energy's (DOE) Office of Buildings and Community Systems (OBCS). This report attempts to integrate the consumer research studies conducted across several public and private organizations over the last four to five years. Some of the sources of studies included in this annotated bibliography are DOE National Laboratories, public and private utilities, trade associations, states, and nonprofit organizations. This study divides the articles identified in this annotated bibliography into sections that are consistent with or similar to the system of organization used by OBCS.

Weijo, R.O.; Roberson, B.F.; Eckert, R.; Anderson, M.R.

1988-05-01T23:59:59.000Z

167

Passive-solar-cooling system concepts for small office buildings. Final report  

SciTech Connect (OSTI)

This report summarizes the efforts of a small group of building design professionals and energy analysis experts to develop passive solar cooling concepts including first cost estimates for small office buildings. Two design teams were brought together at each of two workshops held in the fall of 1982. Each team included an architect, mechanical engineer, structural engineer, and energy analysis expert. This report presents the passive cooling system concepts resulting from the workshops. It summarizes the design problems, solutions and first-cost estimates relating to each technology considered, and documents the research needs identified by the participants in attempting to implement the various technologies in an actual building design. Each design problem presented at the workshops was based on the reference (base case) small office building analyzed as part of LBL's Cooling Assessment. Chapter II summarizes the thermal performance, physical specifications and estimated first-costs of the base case design developed for this work. Chapters III - VI describe the passive cooling system concepts developed for each technology: beam daylighting; mass with night ventilation; evaporative cooling; and integrated passive cooling systems. The final Chapters, VII and VIII present the preliminary implications for economics of passive cooling technologies (based on review of the design concepts) and recommendations of workshop participants for future research in passive cooling for commercial buildings. Appendices provide backup information on each chapter as indicated.

Whiddon, W.I.; Hart, G.K.

1983-02-01T23:59:59.000Z

168

OSTI Publications | OSTI, US Dept of Energy, Office of Scientific...  

Office of Scientific and Technical Information (OSTI)

Workshop and Meeting Reports OSTI Publications Apr 2015 In the OSTI Collections: Supernovae Mar 2015 In the OSTI Collections: Josephson Junctions Feb 2015 In the OSTI...

169

THE DEPARTMENT OF ENERGY Office of Public Affairs  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

responsibilities as deputy, he oversaw the agency's General Counsel, and Compliance and Governance, Risk Management, Internal Audit, Public Affairs, Finance, and Corporate...

170

EMCS and time-series energy data analysis in a large government office building  

SciTech Connect (OSTI)

Energy Management Control System (EMCS) data are an underutilized source of information on the performance of commercial buildings. Newer EMCS's have the ability and storage capacity to trend large amounts of data and perform preliminary analyses; however, these features often receive little or no use, as operators are generally not trained in data management, visualization, and analysis. Whole-building hourly electric-utility data are another readily available and underutilized source of information. This paper outlines the use of EMCS and utility data to evaluate the performance of the Ronald V. Dellums Federal Building in Oakland, California, a large office building operated by the Federal General Services Administration (GSA). The project began as an exploratory effort at Lawrence Berkeley National Laboratory (LBNL) to examine the procedures operators were using to obtain information and operate their buildings. Trending capabilities were available, but in limited use by the operators. LBNL worked with the building operators to use EMCS to trend one-minute data for over one-hundred points. Hourly electricity-use data were also used to understand usage patterns and peak demand. The paper describes LBNL's key findings in the following areas: Characterization of cooling plant operations; Characterization of economizer performance; Analysis of annual energy use and peak demand operations; Techniques, strengths, and shortcomings of EMCS data analysis; Future plans at the building for web-based remote monitoring and diagnostics. These findings have helped GSA develop strategies for peak demand reduction in this and other GSA buildings. Such activities are of great interest in California and elsewhere, where electricity reliability and demand are currently problematic. Overall, though the building's energy use is fairly low, significant energy savings are available by improving the existing EMCS control strategies.

Piette, Mary Ann; Kinney, Satkartar; Friedman, Hannah

2001-04-01T23:59:59.000Z

171

Measurements and Comparisons of Sunlighted and North-Lighted Atriums on Two Office Buildings in Dallas, Texas  

E-Print Network [OSTI]

The use of natural light (daylighting) in the atriums of office buildings is often done to supplement or eliminate the artificial lighting otherwise required. To the extent that the daylight can be effectively admitted and then distributed...

Molinelli, J. F.; Kim, K.

1986-01-01T23:59:59.000Z

172

Optimal design of ground source heat pump system integrated with phase change cooling storage tank in an office building  

E-Print Network [OSTI]

Optimal design of ground source heat pump system integrated with phase change cooling storage tank in an office building Na Zhu*, Yu Lei, Pingfang Hu, Linghong Xu, Zhangning Jiang Department of Building Environment and Equipment Engineering... heat pump system integrated with phase change cooling storage technology could save energy and shift peak load. This paper studied the optimal design of a ground source heat pump system integrated with phase change thermal storage tank in an office...

Zhu, N.

2014-01-01T23:59:59.000Z

173

Office Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2007 10,998 9,933 10,998 10,643 10,998through 1996) inDecadeDecade Year-0Year Jan Feb Mar Apr MayYear

174

City of Philadelphia- Energy Standards for Public Buildings  

Broader source: Energy.gov [DOE]

In 2009, the Philadelphia Office of Sustainability released a six-year plan, [http://www.phila.gov/green/greenworks/index.html Greenworks Philadelphia], to become the greenest city in America. The...

175

Publications | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched5 IndustrialIsadore Perlman, 1960 TheOrganizationProcesses(SC) PublicPublications

176

Final report of the radiological release survey of Building 11 at the Grand Junction Office Facility  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 11 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

Johnson, R.K.; Corle, S.G.

1997-09-01T23:59:59.000Z

177

Final report of the radiological release survey of Building 19 at the Grand Junction Office Facility  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 19 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

Johnson, R.K.; Corle, S.G.

1997-09-01T23:59:59.000Z

178

Final report of the radiological release survey of Building 29 at the Grand Junction Office Facility  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailing during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 29 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

Johnson, R.K.; Corle, S.G.

1997-09-01T23:59:59.000Z

179

Reducing Plug and Process Loads for a Large Scale, Low Energy Office Building: NREL's Research Support Facility; Preprint  

SciTech Connect (OSTI)

This paper documents the design and operational plug and process load energy efficiency measures needed to allow a large scale office building to reach ultra high efficiency building goals. The appendices of this document contain a wealth of documentation pertaining to plug and process load design in the RSF, including a list of equipment was selected for use.

Lobato, C.; Pless, S.; Sheppy, M.; Torcellini, P.

2011-02-01T23:59:59.000Z

180

National Petroleum Technology Office`s publication list, July--December 1997  

SciTech Connect (OSTI)

This publication is a list of Department of Energy funded research and development efforts from the general area of Petroleum Technology. It consists of titles, authors, short abstracts, and ordering information. Also listed are software available from the same sources. This publication lists items which have been made available between July and December, 1997.

NONE

1998-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Simulation-based assessment of the energy savings benefits of integrated control in office buildings  

SciTech Connect (OSTI)

The purpose of this study is to use existing simulation tools to quantify the energy savings benefits of integrated control in office buildings. An EnergyPlus medium office benchmark simulation model (V1.0_3.0) developed by the Department of Energy (DOE) was used as a baseline model for this study. The baseline model was modified to examine the energy savings benefits of three possible control strategies compared to a benchmark case across 16 DOE climate zones. Two controllable subsystems were examined: (1) dimming of electric lighting, and (2) controllable window transmission. Simulation cases were run in EnergyPlus V3.0.0 for building window-to-wall ratios (WWR) of 33percent and 66percent. All three strategies employed electric lighting dimming resulting in lighting energy savings in building perimeter zones ranging from 64percent to 84percent. Integrated control of electric lighting and window transmission resulted in heating, ventilation, and air conditioning (HVAC) energy savings ranging from ?1percent to 40percent. Control of electric lighting and window transmission with HVAC integration (seasonal schedule of window transmission control) resulted in HVAC energy savings ranging from 3percent to 43percent. HVAC energy savings decreased moving from warm climates to cold climates and increased when moving from humid, to dry, to marine climates.

Hong, T.; Shen, E.

2009-11-01T23:59:59.000Z

182

Office of Global Public Health www.globalhealth.utah.edu  

E-Print Network [OSTI]

Join Us via GoToWebinar Please Register Here https://www3.gotomeeting.com/register-being and Abuse History of Women Utilizing Social Services in Gujarat, India" Akiko Way, Suite A Public Health Classroom 203 Join us in person or via Go

183

Methodology of CO{sub 2} emission evaluation in the life cycle of office building facades  

SciTech Connect (OSTI)

The construction industry is one of the greatest sources of pollution because of the high level of energy consumption during its life cycle. In addition to using energy while constructing a building, several systems also use power while the building is operating, especially the air-conditioning system. Energy consumption for this system is related, among other issues, to external air temperature and the required internal temperature of the building. The facades are elements which present the highest level of ambient heat transfer from the outside to the inside of tall buildings. Thus, the type of facade has an influence on energy consumption during the building life cycle and, consequently, contributes to buildings' CO{sub 2} emissions, because these emissions are directly connected to energy consumption. Therefore, the aim is to help develop a methodology for evaluating CO{sub 2} emissions generated during the life cycle of office building facades. The results, based on the parameters used in this study, show that facades using structural glazing and uncolored glass emit the most CO{sub 2} throughout their life cycle, followed by brick facades covered with compound aluminum panels or ACM (Aluminum Composite Material), facades using structural glazing and reflective glass and brick facades with plaster coating. On the other hand, the typology of facade that emits less CO{sub 2} is brickwork and mortar because its thermal barrier is better than structural glazing facade and materials used to produce this facade are better than brickwork and ACM. Finally, an uncertainty analysis was conducted to verify the accuracy of the results attained. - Highlights: Black-Right-Pointing-Pointer We develop a methodology for evaluating CO{sub 2} emissions generated during the life cycle of office building facades. Black-Right-Pointing-Pointer This methodology is based in LCA. Black-Right-Pointing-Pointer We use an uncertainty analysis to verify the accuracy of the results attained. Black-Right-Pointing-Pointer We study three typologies of facades. Black-Right-Pointing-Pointer Facades using structural glazing and uncolored glass emit the most CO{sub 2} throughout their life cycle.

Taborianski, Vanessa Montoro; Prado, Racine T.A., E-mail: racine.prado@poli.usp.br

2012-02-15T23:59:59.000Z

184

Statistical Analysis and Interpretation of Building Characterization, Indoor Environmental Quality Monitoring and Energy Usage Data from Office Buildings and Classrooms in the United States  

SciTech Connect (OSTI)

Three independent tasks had been performed (Stetzenbach 2008, Stetzenbach 2008b, Stetzenbach 2009) to measure a variety of parameters in normative buildings across the United States. For each of these tasks 10 buildings were selected as normative indoor environments. Task 1 focused on office buildings, Task 13 focused on public schools, and Task 0606 focused on high performance buildings. To perform this task it was necessary to restructure the database for the Indoor Environmental Quality (IEQ) data and the Sound measurement as several issues were identified and resolved prior to and during the transfer of these data sets into SPSS. During overview discussions with the statistician utilized in this task it was determined that because the selection of indoor zones (1-6) was independently selected within each task; zones were not related by location across tasks. Therefore, no comparison would be valid across zones for the 30 buildings so the by location (zone) data were limited to three analysis sets of the buildings within each task. In addition, differences in collection procedures for lighting were used in Task 0606 as compared to Tasks 01 & 13 to improve sample collection. Therefore, these data sets could not be merged and compared so effects by-day data were run separately for Task 0606 and only Task 01 & 13 data were merged. Results of the statistical analysis of the IEQ parameters show statistically significant differences were found among days and zones for all tasks, although no differences were found by-day for Draft Rate data from Task 0606 (p>0.05). Thursday measurements of IEQ parameters were significantly different from Tuesday, and most Wednesday measures for all variables of Tasks 1 & 13. Data for all three days appeared to vary for Operative Temperature, whereas only Tuesday and Thursday differed for Draft Rate 1m. Although no Draft Rate measures within Task 0606 were found to significantly differ by-day, Temperature measurements for Tuesday and Thursday showed variation. Moreover, Wednesday measurements of Relative Humidity within Task 0606 varied significantly from either Tuesday or Thursday. The majority of differences in IEQ measurements by-zone were highly significant (p<0.001), with the exception of Relative Humidity in some buildings. When all task data were combined (30 buildings) neither the airborne culturable fungi nor the airborne non-culturable spore data differed in the concentrations found at any indoor location in terms of day of collection. However, the concentrations of surface-associated fungi varied among the day of collection. Specifically, there was a lower concentration of mold on Tuesday than on Wednesday, for all tasks combined. As expected, variation was found in the concentrations of both airborne culturable fungi and airborne non-culturable fungal spores between indoor zones (1-6) and the outdoor zone (zone 0). No variation was found among the indoor zones of office buildings for Task 1 in the concentrations of airborne culturable fungi. However, airborne non-culturable spores did vary among zones in one building in Task 1 and variation was noted between zones in surface-associated fungi. Due to the lack of multiple lighting measurements for Tasks 13 and 0606, by-day comparisons were only performed for Task 1. No statistical differences were observed in lighting with respect to the day of collection. There was a wide range of variability by-zone among seven of the office buildings. Although few differences were found for the brightest illumination of the worksurface (IllumWkSfcBrtst) and the darkest illumination of the worksurface (IllumWkSfcDrkst) in Task 1, there was considerable variation for these variables in Task 13 and Task 0606 (p < 0.001). Other variables that differed by-zone in Task 13 include CombCCT and AmbCCT1 for S03, S07, and S08. Additionally, AmbChromX1, CombChromY, and CombChromX varied by-zone for school buildings S02, S04, and S05, respectively. Although all tasks demonstrated significant differences in sound measurements by zone, some of the buil

Linda Stetzenbach; Lauren Nemnich; Davor Novosel

2009-08-31T23:59:59.000Z

185

Energy Efficiency and Sustainable Construction Standards for Public Buildings  

Broader source: Energy.gov [DOE]

Senate Bill 130 of 2008 established energy efficiency goals for new state building projects. All major facility projects over 10,000 square feet should strive to exceed the efficiency standards of...

186

City of Plano- LEED Standard for Public Buildings  

Broader source: Energy.gov [DOE]

As of January 2007, the City of Plano adopted a policy to "finance, plan, design, construct, manage, renovate, and maintain its facilities and buildings to be sustainable." This standard applies...

187

City of Chamblee- LEED Requirement for Public and Commercial Buildings  

Broader source: Energy.gov [DOE]

In March 2008, the Chamblee City Council voted unanimously to require all private development 20,000 square feet or greater to become LEED certified. Additionally, all future municipal buildings...

188

Stewardship of public school land by the General Land Office  

E-Print Network [OSTI]

objectives and improvements for the operation. The entire operation is placed on a competitive bid with the lease being awarded to the bidder demonstrating a superior management plan and qualified experience. Due to the competitive nature of the bids... Assisting the Asset Management Division Revegetating Easements Public Information Special Projects MANAGEMENT IMPLICATIONS Complications in Management Resource Improvements Management Changes CONCLUSION LITERATURE CITED APPENDIX A APPENDIX 8...

Zechiel, Tod Peter

1987-01-01T23:59:59.000Z

189

LATINO DESCRIPTIVE REPRESENTATION IN LOCAL PUBLIC OFFICE IN TEXAS  

E-Print Network [OSTI]

rolling beyond its humble beginnings. To great minds like Matt Baretto, Gary Segura, Gabe Sanchez, David Leal, Rodney Hero, and many others who continue to produce compelling data on Latinos? role in American politics. To numerous public officials... to derive inferences to Latino participation. Latino electoral participation is lower than most other identifiable demographic segments of the U.S. population, including other identifiable ethnic and racial groups (Garcia and Sanchez 2008). While...

Holstein, Carlos 1983-

2012-05-03T23:59:59.000Z

190

A Semi-Empirical Model for Studying the Impact of Thermal Mass and Cost-Return Analysis on Mixed-mode Ventilation in Office Buildings  

E-Print Network [OSTI]

Vertical location EME Energy consumption by mechanical ventilation z0 Vertical location of the neutral and cost-return analysis on mixed-mode ventilation in office buildings," Energy and Buildings, 67, 267 consume about 40% of total primary energy [1], and the energy consumption of office buildings comprises

Chen, Qingyan "Yan"

191

Investigating Daylight Quality In Malaysian Government Office Buildings Through Daylight Factor  

E-Print Network [OSTI]

Abstract—In recent years, there has been an increasing interest in using daylight to save energy in buildings. In tropical regions, daylighting is always an energy saver. On the other hand, daylight provides visual comfort. According to standards, it shows that many criteria should be taken into consideration in order to have daylight utilization and visual comfort. The current standard in Malaysia, MS 1525 does not provide sufficient guideline. Hence, more research is needed on daylight performance. If architects do not consider daylight design, it not only causes inconvenience in working spaces but also causes more energy consumption as well as environmental pollution. This research had surveyed daylight performance in 5 selected office buildings from different area of Malaysian through experimental method. Several parameters of daylight quality such as daylight factor, surface luminance and surface luminance ratio were measured in different rooms in each building. The result of this research demonstrated that most of the buildings were not designed for daylight utilization. Therefore, it is very important that architects follow the daylight design recommendation to reduce consumption of electric power for artificial lighting while the sufficient quality of daylight is available. Keywords—Daylight factor, Field measurement, Daylighting quality, Tropical

Surface Luminance; Mohd Zin K; Mohd Sabere Sulaiman; Yong Razidah Rashid; Dilshan Remaz Ossen; Aminatuzuhariah M; Lim Yaik Wah; Mansour Nikpour

192

Technical Support Document: Strategies for 50% Energy Savings in Large Office Buildings  

SciTech Connect (OSTI)

This Technical Support Document (TSD) documents technical analysis that informs design guidance for designing and constructing large office buildings that achieve 50% net site energy savings over baseline buildings defined by minimal compliance with respect to ANSI/ASHRAE/IESNA Standard 90.1-2004. This report also represents a step toward developing a methodology for using energy modeling in the design process to achieve aggressive energy savings targets. This report documents the modeling and analysis methods used to identify design recommendations for six climate zones that capture the range of U.S. climate variability; demonstrates how energy savings change between ASHRAE Standard 90.1-2007 and Standard 90.1-2004 to determine baseline energy use; uses a four-story 'low-rise' prototype to analyze the effect of building aspect ratio on energy use intensity; explores comparisons between baseline and low-energy building energy use for alternate energy metrics (net source energy, energy emissions, and energy cost); and examines the extent to which glass curtain construction limits achieve energy savings by using a 12-story 'high-rise' prototype.

Leach, M.; Lobato, C.; Hirsch, A.; Pless, S.; Torcellini, P.

2010-09-01T23:59:59.000Z

193

Final report of the radiological release survey of Building 54 at the Grand Junction Office Facility  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 54 and the underlying soil were found not to be radiologically contaminated, and can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual release report for each GJO building.

Johnson, R.K.; Corle, S.G.

1997-09-01T23:59:59.000Z

194

Peak demand reduction from pre-cooling with zone temperature reset in an office building  

SciTech Connect (OSTI)

The objective of this study was to demonstrate the potential for reducing peak-period electrical demand in moderate-weight commercial buildings by modifying the control of the HVAC system. An 80,000 ft{sup 2} office building with a medium-weight building structure and high window-to-wall ratio was used for a case study in which zone temperature set-points were adjusted prior to and during occupancy. HVAC performance data and zone temperatures were recorded using the building control system. Additional operative temperature sensors for selected zones and power meters for the chillers and the AHU fans were installed for the study. An energy performance baseline was constructed from data collected during normal operation. Two strategies for demand shifting using the building thermal mass were then programmed in the control system and implemented progressively over a period of one month. It was found that a simple demand limiting strategy performed well in this building. This strategy involved maintaining zone temperatures at the lower end of the comfort region during the occupied period up until 2 pm. Starting at 2 pm, the zone temperatures were allowed to float to the high end of the comfort region. With this strategy, the chiller power was reduced by 80-100% (1-2.3 W/ft{sup 2}) during normal peak hours from 2-5 pm, without causing any thermal comfort complaints. The effects on the demand from 2-5 pm of the inclusion of pre-cooling prior to occupancy are unclear.

Xu, Peng; Haves, Philip; Piette, Mary Ann; Braun, James

2004-08-01T23:59:59.000Z

195

Peak Demand Reduction from Pre-Cooling with Zone Temperature Reset in an Office Building  

SciTech Connect (OSTI)

The objective of this study was to demonstrate the potential for reducing peak-period electrical demand in moderate-weight commercial buildings by modifying the control of the HVAC system. An 80,000 ft{sup 2} office building with a medium-weight building structure and high window-to-wall ratio was used for a case study in which zone temperature set-points were adjusted prior to and during occupancy. HVAC performance data and zone temperatures were recorded using the building control system. Additional operative temperature sensors for selected zones and power meters for the chillers and the AHU fans were installed for the study. An energy performance baseline was constructed from data collected during normal operation. Two strategies for demand shifting using the building thermal mass were then programmed in the control system and implemented progressively over a period of one month. It was found that a simple demand limiting strategy performed well in this building. This strategy involved maintaining zone temperatures at the lower end of the comfort region during the occupied period up until 2 pm. Starting at 2 pm, the zone temperatures were allowed to float to the high end of the comfort region. With this strategy, the chiller power was reduced by 80-100% (1-2.3 W/ft{sup 2}) during normal peak hours from 2-5 pm, without causing any thermal comfort complaints. The effects on the demand from 2-5 pm of the inclusion of pre-cooling prior to occupancy are unclear.

Xu, Peng; Haves, Philip; Piette, Mary Ann; Braun, James

2006-08-01T23:59:59.000Z

196

Public Benefits | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched5 IndustrialIsadore Perlman, 1960 TheOrganizationProcesses(SC) Public Affairs

197

Public Notifications | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched5 IndustrialIsadore Perlman, 1960 TheOrganizationProcesses(SC) Public

198

Commercial Buildings Energy Consumption Survey (CBECS) Public Use Data  

Annual Energy Outlook 2013 [U.S. Energy Information Administration (EIA)]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) " ,"ClickPipelines AboutDecemberSteam Coal Import96 4.87CBECS Public Use Data CBECS Public Use Data Public

199

Environmental Justice and Public Participation Through Technology— Building Community Capacity  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy (DOE) is committed to environmental justice and public participation. DOE is working to involve citizens early and often in its decision making process. Meaningful...

200

Better Buildings Alliance  

Broader source: Energy.gov [DOE]

Commercial Buildings Integration Project for the 2013 Building Technologies Office's Program Peer Review

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

An in-depth Analysis of Space Heating Energy Use in Office Buildings  

E-Print Network [OSTI]

load reduction for a net zero energy building, ACEEE Summergreen building or net zero energy building goals, which

Lin, Hung-Wen

2013-01-01T23:59:59.000Z

202

Controlling Capital Costs in High Performance Office Buildings: A Review of Best Practices for Overcoming Cost Barriers  

SciTech Connect (OSTI)

This paper presents a set of 15 best practices for owners, designers, and construction teams of office buildings to reach high performance goals for energy efficiency, while maintaining a competitive budget. They are based on the recent experiences of the owner and design/build team for the Research Support Facility (RSF) on National Renewable Energy Facility's campus in Golden, CO, which show that achieving this outcome requires each key integrated team member to understand their opportunities to control capital costs.

Pless, S.; Torcellini, P.

2012-05-01T23:59:59.000Z

203

Development of a High-Performance Office Building Simulation Model for a Hot and Humid Climate  

E-Print Network [OSTI]

48% total energy savings above the ASHRAE 90.1-1999 code and 61% savings when compared to the calibrated simulation model of the case-study building. The results show that substantial energy savings can be achieved only by using common... to the field measured data and was presented in the previous publication (Cho and Haberl, 2008a). The calibrated simulation model was further extended to an ASHRAE 90.1 code-compliant model, which was used as the baseline model for the development of a...

Cho, S.; Haberl, J.

204

An Operational Energy Consumption Evaluation Index System for Large Public Buildings  

E-Print Network [OSTI]

ICEBO2006, Shenzhen, China Building Commissioning for Energy Efficiency and Comfort Vol.VII-2-2 An Operational Energy Consumption Evaluation Index System for Large Public Buildings1..., indexes system 1. PREFACE With the continuous development of urbanization level, the lack of energy and the increasing of society?s requirement for energy has become one of the prominent contradictions restricting the development of society...

Li, Y.; Zhang, J.; Sun, D.

2006-01-01T23:59:59.000Z

205

Can Architects Help Transform Public Education? What the Sarasota County Civic School Building Program (1955-1960) Teaches Us  

E-Print Network [OSTI]

these understandings might then help educators build on theCan Architects Help Transform Public Education? What thesomebody to listen and help out, and there was so much

Paley, Nicholas B.

2013-01-01T23:59:59.000Z

206

Energy Savings Potential of Flexible and Adaptive HVAC Distribution Systems for Office Buildings  

SciTech Connect (OSTI)

It has been understood by architects and engineers that office buildings with easily re-configurable space and flexible mechanical and electrical systems are able to provide comfort that increases worker productivity while using less energy. Raised floors are an example of how fresh air, thermal conditioning, lighting needs, and network access can be delivered in a flexible manner that is not ''embedded'' within the structure. What are not yet documented is how well these systems perform and how much energy they can save. This area is being investigated in phased projects of the 21st Century Research Program of the Air-conditioning and Refrigeration Technology Institute. For the initial project, research teams at the Center for Building Performance and Diagnostics, Pittsburgh, Pennsylvania, and Oak Ridge National Laboratory, Oak Ridge, Tennessee, documented the diversity, performance, and incidence of flexible and adaptive HVAC systems. Information was gathered worldwide from journal and conference articles, case studies, manufactured products and assemblies, and interviews with design professionals. Their report thoroughly describes the variety of system types along with the various design alternatives observed for plenums, diffusers, individual control, and system integration. Many of the systems are illustrated in the report and the authors provide quantitative and qualitative comparisons. Among conclusions regarding key design issues, and barriers to widespread adoption, the authors state that flexible and adaptive HVAC systems, such as underfloor air, perform as well if not better than ceiling-based systems. Leading engineers have become active proponents after their first experience, which is resulting in these flexible and adaptive HVAC systems approaching 10 percent of the new construction market. To encourage adoption of this technology that improves thermal comfort and indoor air quality, follow-on work is required to further document performance. Architects, professional engineers, and commercial real estate developers will benefit from the availability of information that quantifies energy savings, first cost construction differences, and additional operating costs created when office space must be reconfigured to accommodate new tenants.

Loftness, Vivian; Brahme, Rohini; Mondazzi, Michelle; Vineyard, Edward; MacDonald, Michael

2002-06-01T23:59:59.000Z

207

Property:Buildings/PublicationYear | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformationInyo County,InformationInformation Pellets JumpModelNamePublicationYear Jump

208

Energy Standards for Public Buildings | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address:011-DNA Jump37. It isInformation Contracts (ESPC) Webinar Jump to:S A Jump

209

Public outcomes: Building a 21st century national innovation system that serves the public  

SciTech Connect (OSTI)

Federal R and D must be principally focused on solving public problems that the marketplace is failing to address. With few exceptions programs must be supported by roadmaps that show how the R and D is linked to public outcomes. Federal R and D and those who perform it must be judged in terms of the public outcomes. The overarching issues of federal R and D policy, what it should address, how to manage it, who should perform it, how to perform it, what works best, etc. are highly complex and lack a strong theoretical foundation. (In fact, the linear, assembly-line model used by policymakers is wrong.) It is time that policymakers recognize and acknowledge the uncertainty of their work and conduct a wide array of policy experiments (the authors consider SEMATECH such an experiment) that are supported by public outcome metrics. In addition to making federal R and D better address public needs, such an approach to policy making could raise the public`s interest in T and S policy. Of course, as in any experiment the results may be measured and if failures aren`t observed, it is likely that policies lack vision and imagination. It is time to abandon the budget driven federal R and D system where performers of federal R and D are treated as constituents, and replace it with a public problem--public outcome driven system where public problems are prioritized and the budget is distributed to agencies according to these priorities.

Gover, J. [Sandia National Labs., Albuquerque, NM (United States); Huray, P.; Carayannis, E. [George Washington Univ., Washington, DC (United States)

1997-09-01T23:59:59.000Z

210

Energy Factors, Leasing Structure and the Market Price of Office Buildings in the U.S.  

E-Print Network [OSTI]

such as the energy efficiency of building engineeringIEA, 2008, Energy efficiency requirements in building codes,motivating energy-efficiency in these buildings. 2 Direct

Jaffee, Dwight; Stanton, Richard; Wallace, Nancy

2012-01-01T23:59:59.000Z

211

Air quality and thermal comfort in office buildings: Results of a large indoor environmental quality survey  

E-Print Network [OSTI]

ambient Proceedings of Healthy Buildings 2006, Lisbon,Vol.and operation of healthy buildings Introduction Indoor airdatabase Proceedings of Healthy Buildings 2006, Lisbon,Vol.

Huizenga, C; Abbaszadeh, S.; Zagreus, Leah; Arens, Edward A

2006-01-01T23:59:59.000Z

212

An in-depth Analysis of Space Heating Energy Use in Office Buildings  

E-Print Network [OSTI]

and operation of low energy buildings. In this study, thecommercial buildings with low energy consumption. The90.1-2004, Energy standard for buildings except low-rise

Lin, Hung-Wen

2013-01-01T23:59:59.000Z

213

Estimating Total Energy Consumption and Emissions of China's Commercial and Office Buildings  

E-Print Network [OSTI]

of Central Government Buildings. ” Available at: http://Energy Commission, PIER Building End-Use Energy Efficiencythe total lifecycle of a building such as petroleum and

Fridley, David G.

2008-01-01T23:59:59.000Z

214

An experimental setup to evaluate the daylighting performance of an advanced optical light pipe for deep-plan office buildings  

E-Print Network [OSTI]

This research focuses on an advanced optical light pipe daylighting system as a means to deliver natural light at the back of deep-plan office buildings (15ft to 30ft), using optimized geometry and high reflective materials. The light pipe...

Martins Mogo de Nadal, Betina Gisela

2005-11-01T23:59:59.000Z

215

Please cite this article in press as: T. Zhang, et al., Modelling electricity consumption in office buildings: An agent based approach. Energy Buildings (2011), doi:10.1016/j.enbuild.2011.07.007  

E-Print Network [OSTI]

Please cite this article in press as: T. Zhang, et al., Modelling electricity consumption in office behaviour, to simulate the electricity consumption in office buildings. Based on a case study, we use office electricity consumption problems. This paper theoretically contributes to an integration

Aickelin, Uwe

216

Asbestos in public and commercial buildings: A literature review and synthesis of current knowledge  

SciTech Connect (OSTI)

The Health Effects Institute-Asbestos Research assembled an expert Panel to review the literature on asbestos in public and commercial buildings, and make recommendations for future research. The Panel concluded that: (1) Asbestos-containing building material (ACBM) in good repair is unlikely to expose general building occupants to fiber concentrations above those found outside such buildings. The added life-time risk of cancer for such occupants in well-maintained buildings appears to be lower than the risks from other pollutants such as radon and environmental tobacco smoke. (2) Janitorial, custodial, maintenance, and renovation workers may disturb or damage ACBM and episodically produce relatively high fiber concentrations; therefore the added life-time cancer risk in such workers may be appreciably higher than the risk to general building occupants. (3) Asbestos removal workers are at the highest risk of potential exposure. Good work practice and respiratory protection are essential to avoid dangerous exposure of such workers. (4) Determining exposure risks and forms of prevention or remediation warranted in a building are site-specific tasks. Uncontrolled disturbance of ACBM should be avoided. In well-maintained buildings, improper removal or improper abatement action can cause persistent increases of fiber levels.

Not Available

1991-09-25T23:59:59.000Z

217

Analysis of the Design of an HVAC System in a Public Building  

E-Print Network [OSTI]

to west, 2.5 meters high, 1560 m2 in area, fire resistant rating, with four exists. It is planed the reconstructed as a public building with the function of amusement, recreation and performance, so the air conditioning system is necessary...

Wei, P.; Shao, Z.; Chen, H.

2006-01-01T23:59:59.000Z

218

The Advantage of Highly Controlled Lighting for Offices and Commercial Buildings  

E-Print Network [OSTI]

of Highly Controlled Lighting for Offices and Commercialefficient, customized lighting for open-office cubicles.s “ambient” and “task” lighting components, 2) occupancy

Rubinstein, Francis

2010-01-01T23:59:59.000Z

219

Reducing Data Center Loads for a Large-Scale, Low-Energy Office Building: NREL's Research Support Facility (Book)  

SciTech Connect (OSTI)

This publication detailing the design, implementation strategies, and continuous performance monitoring of NREL's Research Support Facility data center. Data centers are energy-intensive spaces that facilitate the transmission, receipt, processing, and storage of digital data. These spaces require redundancies in power and storage, as well as infrastructure, to cool computing equipment and manage the resulting waste heat (Tschudi, Xu, Sartor, and Stein, 2003). Data center spaces can consume more than 100 times the energy of standard office spaces (VanGeet 2011). The U.S. Environmental Protection Agency (EPA) reported that data centers used 61 billion kilowatt-hours (kWh) in 2006, which was 1.5% of the total electricity consumption in the U.S. (U.S. EPA, 2007). Worldwide, data centers now consume more energy annually than Sweden (New York Times, 2009). Given their high energy consumption and conventional operation practices, there is a potential for huge energy savings in data centers. The National Renewable Energy Laboratory (NREL) is world renowned for its commitment to green building construction. In June 2010, the laboratory finished construction of a 220,000-square-foot (ft{sup 2}), LEED Platinum, Research Support Facility (RSF), which included a 1,900-ft{sup 2} data center. The RSF will expand to 360,000 ft{sup 2} with the opening of an additional wing December, 2011. The project's request for proposals (RFP) set a whole-building demand-side energy use requirement of a nominal 35 kBtu/ft{sup 2} per year. On-site renewable energy generation will offset the annual energy consumption. To support the RSF's energy goals, NREL's new data center was designed to minimize its energy footprint without compromising service quality. Several implementation challenges emerged during the design, construction, and first 11 months of operation of the RSF data center. This document highlights these challenges and describes in detail how NREL successfully overcame them. The IT settings and strategies outlined in this document have been used to significantly reduce data center energy requirements in the RSF; however, these can also be used in existing buildings and retrofits.

Sheppy, M.; Lobato, C.; Van Geet, O.; Pless, S.; Donovan, K.; Powers, C.

2011-12-01T23:59:59.000Z

220

University Buildings Landmark Buildings  

E-Print Network [OSTI]

KEY University Buildings Landmark Buildings The Lanyon Building Roads Footpath Cafe Grass Queen's University Belfast Campus Map The Lanyon Building The Students' Union The David Keir Building School Offices and Sonic Arts Q Nursing and Midwifery R Pharmacy S Planning, Architecture and Civil Engineering T Politics

Paxton, Anthony T.

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

University Buildings Landmark Buildings  

E-Print Network [OSTI]

KEY University Buildings Landmark Buildings The Lanyon Building Roads Footpath Cafe University Accommodation Queen's University Belfast Campus Map The Lanyon Building The Students' Union The David Keir Building School Offices A Biological Sciences B Chemistry and Chemical Engineering C Education D

Müller, Jens-Dominik

222

Uncertainties in Energy Consumption Introduced by Building Operations and Weather for a Medium-Size Office Building  

E-Print Network [OSTI]

Uncertainties in Energy Consumption Introduced by Buildingand actual building energy consumption can be attributed touncertainties in energy consumption due to actual weather

Wang, Liping

2014-01-01T23:59:59.000Z

223

Contaminants in Buildings and Occupied Spaces as Risk Factors forOccupant Symptoms in U.S. Office Buildings: Findings from the U.S. EPABASE Study  

SciTech Connect (OSTI)

Nonspecific building-related symptoms among occupants of modern office buildings worldwide are common and may be associated with important reductions in work performance, but their etiology remains uncertain. Most reported research into environmental risk factors for these symptoms has focused on ventilation system-related factors, dampness, and particle removal through filtration and cleaning, with relatively few studies of other potential sources of indoor contaminants. We analyzed data collected by the U.S. Environmental Protection Agency (EPA) from a representative sample of 100 large U.S. office buildings--the Building Assessment and Survey Evaluation (BASE) study--using multivariate-adjusted logistic regression models with generalized estimating equations. We estimated odds ratios (ORs) and 95% confidence intervals (CIs) for associations between seven building-related symptom outcomes and a diverse set of potential indoor and outdoor sources for indoor pollutants. Although most of the investigated risk factors showed no apparent association with building-related symptoms, some interesting associations resulted. Increased prevalence of symptoms was associated with carpets older than one year (lower respiratory symptoms), non-carpeted floors (upper and lower respiratory symptoms), older furniture (eye and skin symptoms), infrequent vacuuming (upper respiratory, eye, and skin symptoms and headache), and masonry exterior walls (cough, eye symptoms, and fatigue/concentration difficulty). For the many potential risk factors assessed, almost none had been investigated previously, and many associations found here may have been by chance. Additional confirmatory research focused on risk factors initially identified here is needed, using more objective measures of health outcomes and risk factors or exposures.

Mendell, M.J.; Mirer, A.; Lei-Gomez, Q.

2007-08-01T23:59:59.000Z

224

Draft or breeze? preferences for air movement in office buildings and schools from the ASHRAE database  

E-Print Network [OSTI]

17-22, Copenhagen. Healthy Buildings 2009, September 13-17,and 6% wanted less. Healthy Buildings 2009, September 13-17,Slightly warm Warm Hot Healthy Buildings 2009, September 13-

Hoyt, Tyler; Zhang, Hui Ph.D; Arens, Edward

2009-01-01T23:59:59.000Z

225

Impact of Continuous Commissioning® on the Energy Star® Rating of Hospitals and Office Buildings  

E-Print Network [OSTI]

in Commercial Buildings ..................................................... 1 1.2 Commercial Buildings Energy Performance .......................................... 2 1.3 Background and Purpose of Study... the reduction in consumption by improving overall efficiency is apparently one of the most viable options to explore. 1.1 Energy Use in Commercial Buildings Energy costs for an estimated total of 4.8 million commercial buildings in the United States...

Kulkarni, Aditya Arun

2012-02-14T23:59:59.000Z

226

Building the national health information infrastructure for personal health, health care services, public health, and research  

E-Print Network [OSTI]

Professor of Health Management, Cambridge University Health, Judge Institute of Management, University of Cambridge and 2Department of Health Evaluation Sciences, University of Virginia, USA Email: Don E Detmer* - d.detmer@jims.cam.ac.uk * Corresponding... ral BMC Medical Informatics and ssBioMed CentDecision Making Open AcceDebate Building the national health information infrastructure for personal health, health care services, public health, and research Don E Detmer*1,2 Address: 1Dennis Gillings...

Detmer, Don E

2003-01-06T23:59:59.000Z

227

Performance evaluation of passive cooling in office buildings based on uncertainty and sensitivity analysis  

SciTech Connect (OSTI)

Natural night ventilation is an interesting passive cooling method in moderate climates. Driven by wind and stack generated pressures, it cools down the exposed building structure at night, in which the heat of the previous day is accumulated. The performance of natural night ventilation highly depends on the external weather conditions and especially on the outdoor temperature. An increase of this outdoor temperature is noticed over the last century and the IPCC predicts an additional rise to the end of this century. A methodology is needed to evaluate the reliable operation of the indoor climate of buildings in case of warmer and uncertain summer conditions. The uncertainty on the climate and on other design data can be very important in the decision process of a building project. The aim of this research is to develop a methodology to predict the performance of natural night ventilation using building energy simulation taking into account the uncertainties in the input. The performance evaluation of natural night ventilation is based on uncertainty and sensitivity analysis. The results of the uncertainty analysis showed that thermal comfort in a single office cooled with single-sided night ventilation had the largest uncertainty. The uncertainties on thermal comfort in case of passive stack and cross ventilation were substantially smaller. However, since wind, as the main driving force for cross ventilation, is highly variable, the cross ventilation strategy required larger louvre areas than the stack ventilation strategy to achieve a similar performance. The differences in uncertainty between the orientations were small. Sensitivity analysis was used to determine the most dominant set of input parameters causing the uncertainty on thermal comfort. The internal heat gains, solar heat gain coefficient of the sunblinds, internal convective heat transfer coefficient, thermophysical properties related to thermal mass, set-point temperatures controlling the natural night ventilation, the discharge coefficient C{sub d} of the night ventilation opening and the wind pressure coefficients C{sub p} were identified to have the largest impact on the uncertainty of thermal comfort. The impact of the warming climate on the uncertainty of thermal comfort was determined. The uncertainty on thermal comfort appeared to increase significantly when a weather data set with recurrence time of 10 years (warm weather) was applied in the transient simulations in stead of a standard weather data set. Natural night ventilation, designed for normal weather conditions, was clearly not able to ensure a high probability of good thermal comfort in warm weather. To ensure a high probability of good thermal comfort and to reduce the performance uncertainty in a warming climate, natural night ventilation has to be combined with additional measures. Different measures were analysed, based on the results of the sensitivity analysis. All the measures were shown to significantly decrease the uncertainty of thermal comfort in warm weather. The study showed the importance to carry out simulations with a warm weather data set together with the analysis under typical conditions. This approach allows to gain a better understanding of the performance of a natural night ventilation design, and to optimize the design to a robust solution. (author)

Breesch, H. [Building Physics, Construction and Services, Department of Architecture and Urban Planning, Ghent University, J. Plateaustraat 22, B-9000 Ghent (Belgium); Sustainable Building Research Group, Department of Construction, Catholic University College Ghent, Gebroeders Desmetstraat 1, B-9000 Ghent (Belgium); Janssens, A. [Building Physics, Construction and Services, Department of Architecture and Urban Planning, Ghent University, J. Plateaustraat 22, B-9000 Ghent (Belgium)

2010-08-15T23:59:59.000Z

228

Review of Prior Commercial Building Energy Efficiency Retrofit Evaluation: A Report to Snohomish Public Utilities District  

SciTech Connect (OSTI)

Snohomish County Public Utilities District (the District or Snohomish PUD) provides electricity to about 325,000 customers in Snohomish County, Washington. The District has an incentive programs to encourage commercial customers to improve energy efficiency: the District partially reimburses the cost of approved retrofits if they provide a level of energy performance improvement that is specified by contract. In 2013 the District contracted with Lawrence Berkeley National Laboratory to provide a third-party review of the Monitoring and Verification (M&V) practices the District uses to evaluate whether companies are meeting their contractual obligations. This work helps LBNL understand the challenges faced by real-world practitioners of M&V of energy savings, and builds on a body of related work such as Price et al. (2013). The District selected a typical project for which they had already performed an evaluation. The present report includes the District's original evaluation as well as LBNL's review of their approach. The review is based on the document itself; on investigation of the load data and outdoor air temperature data from the building evaluated in the document; and on phone discussions with Bill Harris of the Snohomish County Public Utilities District. We will call the building studied in the document the subject building, the original Snohomish PUD report will be referred to as the Evaluation, and this discussion by LBNL is called the Review.

Price, Phillip

2014-12-22T23:59:59.000Z

229

Indoor Environmental Risk Factors for Occupant Symptoms in 100U.S. Office Buildings: Summary of Three Analyses from the EPA BASEStudy  

SciTech Connect (OSTI)

This paper summarizes three analyses of data on building-related environmental factors and occupant symptoms collected from 100 representative large U.S. office buildings. Using multivariate logistic regression models, we found increased occupant symptoms associated with a number of building-related factors, including lower ventilation rates even at the current guideline levels, lack of scheduled cleaning for air-conditioning drain pans and cooling coils, poor condition of cooling coils, poorly maintained humidification systems, and lower outdoor air intake height. Some expected relationships were not found, and several findings were opposite of expected. Although requiring replication, these findings suggest preventive actions to reduce occupant symptoms in office buildings.

Mendell, M.J.; Lei-Gomez, Q.; Cozen, M.; Brightman, H.S.; Apte,M.; Erdmann, C.A.; Brunner, G.; Girman, J.R.

2006-02-01T23:59:59.000Z

230

Building Scale DC Microgrids  

E-Print Network [OSTI]

Folsom CA, Integration of Renewable Resources: OperationalOffice of Energy Efficiency and Renewable Energy, BuildingOffice of Energy Efficiency and Renewable Energy, Building

Marnay, Chris

2013-01-01T23:59:59.000Z

231

A Model for Evaluation of Life-Cycle Energy Savings of Occupancy Sensors for Control of Lighting and Ventilation in Office Buildings  

E-Print Network [OSTI]

Lighting and ventilation represent the majority of the air conditioning loads in office buildings in hot humid climates. Use of motion sensors is one way to minimize the energy used for these loads. This paper describes the methods used...

Degelman, L. O.

2000-01-01T23:59:59.000Z

232

Risk Factors in Heating, Ventilating, and Air-Conditioning Systemsfor Occupant Symptoms in U.S. Office Buildings: the EPA BASE Study  

SciTech Connect (OSTI)

Nonspecific building-related symptoms among occupants of modern office buildings worldwide are common and may be associated with important reductions in work performance, but their etiology remains uncertain. Characteristics of heating, ventilating, and air-conditioning (HVAC) systems in office buildings that increase risk of indoor contaminants or reduce effectiveness of ventilation may cause adverse exposures and subsequent increase in these symptoms among occupants. We analyzed data collected by the U.S. EPA from a representative sample of 100 large U.S. office buildings--the Building Assessment and Survey Evaluation (BASE) study--using multivariate logistic regression models with generalized estimating equations adjusted for potential personal and building confounders. We estimated odds ratios (ORs) and 95% confidence intervals (CIs) for associations between seven building-related symptom outcomes and selected HVAC system characteristics. Among factors of HVAC design or configuration: Outdoor air intakes less than 60 m above the ground were associated with approximately doubled odds of most symptoms assessed. Sealed (non-operable) windows were associated with increases in skin and eye symptoms (ORs= 1.9, 1.3, respectively). Outdoor air intake without an intake fan was associated with an increase in eye symptoms (OR=1.7). Local cooling coils were associated with increased headache (OR=1.5). Among factors of HVAC condition, maintenance, or operation: the presence of humidification systems in good condition was associated with an increase in headache (OR=1.4), whereas the presence of humidification systems in poor condition was associated with increases in fatigue/difficulty concentrating, as well as upper respiratory symptoms (ORs=1.8, 1.5). No regularly scheduled inspections for HVAC components was associated with increased eye symptoms, cough and upper respiratory symptoms (ORs=2.2, 1.6, 1.5). Less frequent cleaning of cooling coils or drip pans was associated with increased headache (OR=1.6). Fair or poor condition of duct liner was associated with increased upper respiratory symptoms (OR=1.4). Most of the many potential risk factors assessed here had not been investigated previously, and associations found with single symptoms may have been by chance, including several associations that were the reverse of expected. Risk factors newly identified in these analyses that deserve attention include outdoor air intakes less than 60 m above the ground, lack of operable windows, poorly maintained humidification systems, and lack of scheduled inspection for HVAC systems. Infrequent cleaning of cooling coils and drain pans were associated with increases in several symptoms in these as well as prior analyses of BASE data. Replication of these findings is needed, using more objective measurements of both exposure and health response. Confirmation of the specific HVAC factors responsible for increased symptoms in buildings, and development of prevention strategies could have major public health and economic benefits worldwide.

Mendell, M.J.; Lei-Gomez, Q.; Mirer, A.; Seppanen, O.; Brunner, G.

2006-10-01T23:59:59.000Z

233

Energy Performance and Comfort Level in High Rise and Highly Glazed Office Buildings  

E-Print Network [OSTI]

Thermal and visual comfort in buildings play a significant role on occupants' performance but on the other hand achieving energy savings and high comfort levels can be a quite difficult task especially in high rise buildings with highly glazed...

Bayraktar, M.; Perino, M.; Yilmaz, A. Z.

2010-01-01T23:59:59.000Z

234

Design and performance relationships for cable distribution in multi-story office buildings  

E-Print Network [OSTI]

Weaknesses associated with cable distribution systems suggest a lack of design consideration in the planning stage of a building. The primary question to be addressed in this study is do relationships between design considerations and building...

Ryan, Richard Cecil

1990-01-01T23:59:59.000Z

235

Energy Consumption Status of Public Buildings and the Analysis of the Potential on Energy Efficiency in Xiamen  

E-Print Network [OSTI]

Based on the survey on the preset and applied situation of the central air conditioning systems in public buildings in Xiamen, this paper analyzes the status of energy consumption, and indicates the irrational aspects of operation and management...

Pei, X.; Zhang, S.; Chen, L.; Zhang, X.; Chen, J.

2006-01-01T23:59:59.000Z

236

Application and Mode Establishment of Asset-backed Securitization in Existing Large-scale Public Building Retrofit Financing in China  

E-Print Network [OSTI]

Statistical data for 2005 show that electrical consumption of large-scale public buildings occupying 5 percent of total residential construction area equals 50 percent of the total residential electrical consumption in Beijing. It is necessary...

Sun, J.; Wu, Y.; Dai, Z.; Hao, Y.

2006-01-01T23:59:59.000Z

237

July 11 Public Meeting: Physical Characterization of Grid-Connected Commercial And Residential Building End-Use Equipment And Appliances  

Broader source: Energy.gov [DOE]

These documents contain the three slide decks presented at the public meeting on the Physical Characterization of Grid-Connected Commercial and Residential Buildings End-Use Equipment and Appliances, held on July 11, 2014 in Washington, DC.

238

A joint U.S.-China demonstration energy efficient office building  

E-Print Network [OSTI]

design approach is used to identify the most cost-effective energy strategies for this building, including passive solar

Zimmerman, Mary Beth; Huang, Yu JoeWatson, Rob; Shi, Han; Judkoff, Ron; She rman, Micah

2000-01-01T23:59:59.000Z

239

Evidence-based calibration of a building energy simulation model: Application to an office building in Belgium  

E-Print Network [OSTI]

use analysis for use in the frame of an energy efficiency service process. Focus is given to the calibration of a simplified dynamic hourly building energy simulation model by means of available energy use data and to the integration of the calibration...

Bertagnolio, S.; Randaxhe, F.; Lemort, V.

2012-01-01T23:59:59.000Z

240

Final Environmental Assessment for the construction and operation of an office building at the Stanford Linear Accelerator Center. Part 2  

SciTech Connect (OSTI)

The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1107, analyzing the environmental effects relating to the construction and operation of an office building at the Stanford Linear Accelerator Center (SLAC). SLAC is a national facility operated by Stanford University, California, under contract with DOE. The center is dedicated to research in elementary particle physics and in those fields that make use of its synchrotron facilities. The objective for the construction and operation of an office building is to provide adequate office space for existing SLAC Waste Management (WM) personnel, so as to centralize WM personnel and to make WM operations more efficient and effective. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an Environmental Impact Statement is not required. This report contains the Environmental Assessment, as well as the Finding of No Significant Impact (FONSI).

NONE

1995-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Final report of the radiological release survey of Building 30B at the Grand Junction Office Facility  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 30B and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

Krauland, P.A.; Corle, S.G.

1997-09-01T23:59:59.000Z

242

Solar heating and hot water system installed at office building, One Solar Place, Dallas, Texas. Final report  

SciTech Connect (OSTI)

This document is the Final Report of the Solar Energy System Installed at the First Solar Heated Office Building, One Solar Place, Dallas, Texas. The Solar System was designed to provide 87 percent of the space heating needs, 100 percent of the potable hot water needs and is sized for future absorption cooling. The collection subsystem consists of 28 Solargenics, series 76, flat plate collectors with a total area of 1596 square feet. The solar loop circulates an ethylene glycol-water solution through the collectors into a hot water system heat exchanger. The hot water storage subsystem consists of a heat exchanger, two 2300 gallon concrete hot water storage tanks with built in heat exchangers and a back-up electric boiler. The domestic hot water subsystem sends hot water to the 10,200 square feet floor area office building hot water fixtures. The building cold water system provides make-up to the solar loop, the heating loop, and the hot water concrete storage tanks. The design, construction, cost analysis, operation and maintenance of the solar system are described. The system became operational July 11, 1979.

Not Available

1980-06-01T23:59:59.000Z

243

A Survey of High Performance Office Buildings in the United States  

E-Print Network [OSTI]

- Daylight & Passive Solar Heating #0;? Shed Roof ? Rainwater Collection for Fire Protection, Landscaping, & Cloths and Hand Washing #0;? Natural Ventilation System 14 #0;? Energy cost savings of 67% compared to the Standard 90.1-2001. ESL-HH-06-07-21a... buildings, energy conservation is a straightforward “green” benefit that can be shared between owner and tenant (Traugott, 2000). A high performance commercial building is a substantially better building than standard practice in terms of energy...

Cho, S.; Haberl, J. S.

2006-01-01T23:59:59.000Z

244

Submitted to Energy and Buildings February 23, 2005 and accepted for publication March 1, 2006. Subject responses to electrochromic windows  

E-Print Network [OSTI]

. LBNL-57125 Subject responses to electrochromic windows R.D. Clear* , V. Inkarojrit, E.S. Lee Building in a private office with switchable electrochromic windows, manually- operated Venetian blinds, and dimmable fluorescent lights. The electrochromic window had a visible transmittance range of approximately 3

245

Estimating Total Energy Consumption and Emissions of China's Commercial and Office Buildings  

E-Print Network [OSTI]

Primary Electricity Coal Final energy use in buildings is9 million tonnes of coal equivalent energy could be saved byproportion of energy consumed from coal, coke, liquid fuels,

Fridley, David G.

2008-01-01T23:59:59.000Z

246

SIMULATION-ASSISTED DAYLIGHT PERFORMANCE ANALYSISIN A HIGH-RISE OFFICE BUILDING IN SINGAPORE  

E-Print Network [OSTI]

Flodberg, K. (2013). “Daylight utilisation in perimeterJ. , (2005a). “Useful Daylight Illuminance: A NewParadigm to Access Daylight in Buildings”. Lighting

CHIEN, Szu Cheng; TSENG, King Jet

2013-01-01T23:59:59.000Z

247

Measured energy performance of a US-China demonstration energy-efficient office building  

E-Print Network [OSTI]

buildings. Measured electricity consumption Figure 3 showsthe measured total electricity consumption of the buildingmonths of 2005. The electricity consumption per floor area

Xu, Peng; Huang, Joe; Jin, Ruidong; Yang, Guoxiong

2006-01-01T23:59:59.000Z

248

Design and performance relationships for cable distribution in multi-story office buildings.  

E-Print Network [OSTI]

??Weaknesses associated with cable distribution systems suggest a lack of design consideration in the planning stage of a building. The primary question to be addressed… (more)

Ryan, Richard Cecil

2012-01-01T23:59:59.000Z

249

Monitoring-based HVAC Commissioning of an Existing Office Building for Energy Efficiciency  

E-Print Network [OSTI]

Dascalaki E, Gaglia A. HVAC and indoor thermal conditions inCommissioning of Building HVAC Systems for Improving Energyand diagnosis strategy for HVAC systems involving sensor

Wang, Liping

2014-01-01T23:59:59.000Z

250

Estimating Total Energy Consumption and Emissions of China's Commercial and Office Buildings  

E-Print Network [OSTI]

material intensity, energy intensity of materials, buildingtype’s manufacturing energy intensity (how much energy itthe manufacturing energy intensity of each type of building

Fridley, David G.

2008-01-01T23:59:59.000Z

251

Measured energy performance of a US-China demonstration energy-efficient office building  

E-Print Network [OSTI]

heating is provided by district heating. The building isis heated from a district heating system that provides hotconverts the heat from district heating system to the hot

Xu, Peng; Huang, Joe; Jin, Ruidong; Yang, Guoxiong

2006-01-01T23:59:59.000Z

252

Estimating Total Energy Consumption and Emissions of China's Commercial and Office Buildings  

E-Print Network [OSTI]

such as increasing boiler efficiency from 68% averageBuildings: Water Heating Efficiency Boiler Gas Boiler SmallSpace Heating Efficiency District Heating Boiler Gas Boiler

Fridley, David G.

2008-01-01T23:59:59.000Z

253

Seaborg and Kennedy in the AEC Building | U.S. DOE Office of...  

Office of Science (SC) Website

in the AEC Building Basic Energy Sciences (BES) BES Home About Staff Organization Chart .pdf file (46KB) BES Budget BES Committees of Visitors Directions Jobs Organizational...

254

Turkey: Tradition & Transformation 2014 Presented by Public Partnership & Outreach, Office of the Provost at Texas A&M University  

E-Print Network [OSTI]

Turkey: Tradition & Transformation 2014 Presented by Public Partnership & Outreach, Office to Erdogan: Reshaping Turkey through Reform Dr. Sena Karasipahi, International Studies, Texas A&M University of Psychology 12:00 Turkish Cultural Presentation & Lunch 12:45 Let's Go to Turkey: Educators Trip Overview Mr

Behmer, Spencer T.

255

The Mailman School of Public Health of Columbia University Office of Student Affairs, 722 West 168th  

E-Print Network [OSTI]

The Mailman School of Public Health of Columbia University Office of Student Affairs, 722 West 168 registered in other schools of the University) (Limited to 2 courses per semester) Term: Fall Spring., 6th Fl. 305-2271 jh2477@columbia.edu ENVIRONMENTAL HEALTH SCI. Ms. Alysa Turkowitz 722 W. 168 St

Hone, James

256

CMTA Office  

High Performance Buildings Database

Prospect, KY When CMTA outgrew their old office space, the consultant engineering company decided to construct a new building. Not only does the structure provide offices for the firm, it also showcases progressive design elements and allows the firm to test new technologies and demonstrate their effectiveness to clients. The new CMTA office building is located in a live-work development on the outskirts of Louisville, KY. The location was selected to place the office close to where the employees live.

257

Enhanced Operation Strategies for Air-Conditioning and Lighting Systems Toward Peak Power Reduction for an Office Building in Kuwait  

E-Print Network [OSTI]

Enhanced?Operation?Strategies?for?Air? Conditioning?and?Lighting? Systems?Toward?Peak?Power?Reduction? for?an?Office?Building?in?Kuwait F. Alghimlas A. Al-Mulla G.P. Maheshwari D. Al-Nakib Building and Energy Technologies Department...?Increase?in?Power?and?Energy? 6160 6450 6750 7250 7480 7750 8400 8900 9070 9710 27.0 27.5 29.3 31.1 33.1 35.6 37.9 41.6 42.6 45.2 25 30 35 40 45 50 5500 6500 7500 8500 9500 10500 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 Y e a r l y E...

Alghimlas, F.; Al-Mulla, A.; Maheshwari, G.P.; Al-Nakib, D.

2012-01-01T23:59:59.000Z

258

Methods for detailed energy data collection of miscellaneous and electronic loads in a commercial office building  

E-Print Network [OSTI]

Methods for detailed energy data collection of miscellaneous and electronic loads in a commercial and electronic loads (MELs) consume about 20% of the primary energy used in U.S. buildings, and this share Buildings account for 40% of the total primary energy con- sumption in the U.S., with 22% consumed

California at Berkeley, University of

259

Assessment of Solar Energy Conversion Technologies-Application of Thermoelectric Devices in Retrofit an Office Building  

E-Print Network [OSTI]

Thermo electric (TE) devices offer an opportunity to introduce renewable energy into existing and new buildings. TE devices harvest energy from the temperature differential between the hot and cold side of a semiconductor material. In this study...

Azarbayjani, M.; Anderson, J.

260

Retrofit Options for Increasing Energy Efficiency in Office Buildings- Methodology Review  

E-Print Network [OSTI]

Portuguese Buildings represent 35% of primary energy consumption in 2006, with non-residential sector representing almost half of this number globally and around 65% in Lisbon city. Expected to grow 5% yearly in this period, non...

Pereira, N. C.

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Simulation-based assessment of the energy savings benefits of integrated control in office buildings  

E-Print Network [OSTI]

Window-Related Energy Consumption in the US Residential andU.S. Lighting Market Characterization Volume I: National Lighting Inventory and Energy ConsumptionBuilding Energy Consumption Survey. EnergyPlus (2008). U.S.

Hong, T.

2011-01-01T23:59:59.000Z

262

Analysis of the Potential Energy Savings for 14 Office Buildings with VAV Systems  

E-Print Network [OSTI]

At the beginning of an existing building commissioning (EBCx)/energy retrofit project, some form of screening is usually applied to determine whether there is sufficient potential for savings to justify a formal EBCx assessment/energy audit...

Claridge, D. E.; Liu, J.; Baltazar, J. C.

2010-01-01T23:59:59.000Z

263

The new building for the School of Public Health and Health Services (SPHHS) will be a hub of discovery, learning, and  

E-Print Network [OSTI]

Highlights The new building for the School of Public Health and Health Services (SPHHS The 90-foot building fronts Washington Circle and New Hampshire Avenue. The building's approximate 115 at the intersection of 24th Street, New Hampshire Avenue, and K Street near Washington Circle, the new building

Vertes, Akos

264

MEMORANDUM TO: John Cymbalsky, U.S. Department of Energy, Office of Building  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't HappenLow-Cost Production Ex parte2,RE: Ex Parte

265

Building Technologies Program | Clean Energy | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building Technologies Program SHARE Building Technologies Program The Building Technologies Program Office administratively facilitates the integration of ORNL research across...

266

Better Buildings Alliance Equipment Performance Specifications...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Better Buildings Alliance Equipment Performance Specifications - 2013 BTO Peer Review Commercial Buildings Integration Project for the 2013 Building Technologies Office's...

267

Steam System Balancing and Tuning for Multifamily Residential Buildings, Chicago, Illinois (Fact Sheet), Building America Case Study: Technology Solutions for New and Existing Homes, Building Technologies Office (BTO)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the AmericasDOE-STD-3020-2005CodeErnestMacondo(SeptemberStatuteSteam

268

A Case Study of Retro Commissioning in a Standard Commercial Office Building in Japan  

E-Print Network [OSTI]

/h ? 487 , 500kcal/h? 1,200M J /h 1 , 700 l/min?? 7.5kW?? 108MJ/h 108MJ/h 27MJ/h CHRH (b) External melting type ice thermal storage system ICEBO2006, Shenzhen, China Building Commissioning for Energy Efficiency and Comfort, Vol.VI-9... at cooperation with the ice thermal storage tank which already exists ICEBO2006, Shenzhen, China Building Commissioning for Energy Efficiency and Comfort, Vol.VI-9-1 in 1989. Inorder to secure stable thermal storage operationand want to storage many...

Kamitani, K.; Shimazu, M.; Inomata, N.

2006-01-01T23:59:59.000Z

269

Simulation Support for Optimizing the Design and Operation of a Large Open-Space Office Building  

E-Print Network [OSTI]

University of Technology PBA International Mech. Eng. Faculty Building Physics & Systems Prague 7 Prague 6, Czech Republic Eindhoven, Netherlands Czech Republic ABSTRACT This paper deals with design and post-design operational optimization studies... inverters. Some of the air is extracted ESL-IC-08-10-74 Proceedings of the Eighth International Conference for Enhanced Building Operations, Berlin, Germany, October 20-22, 2008 20 22 24 26 28 30 32 34 12.7 13.7 14.7 15.7 16.7 17.7 18.7 19.7 A i r t e m...

Lain, M.; Hensen, J.; Zemlicka, J.

270

Cost-Effective Energy Efficiency Measures for Above Code (ASHRAE 90.1-2001 and 2007) Small Office Buildings in the City of Arlington  

E-Print Network [OSTI]

COST-EFFECTIVE ENERGY EFFICIENCY MEASURES FOR ABOVE CODE (ASHRAE 90.1-2001 and 2007) SMALL OFFICE BUILDINGS IN THE CITY OF ARLINGTON A Research Project for the City of Arlington ENERGY SYSTEMS LABORATORY Texas Engineering Experiment Station Texas... of the review: Summary of above-code approaches that have been made in the CoA during the 2008-2010. ? Results of the current project: Recommendations of 17 energy efficiency measures (EEMs) to maximize energy savings for small office buildings in the Co...

2011-01-01T23:59:59.000Z

271

A brief introduction on training and public information of building energy codes in the U.S.  

SciTech Connect (OSTI)

This report is associated with the project of Implementation of Building Energy Codes in China (55793). The report aims to give Chinese audience a brief introduction on training and public information activities of building energy codes in the U.S. The report contains four sections: Section One is about the development history and implementation of building energy codes in the U.S. Section Two is about the organizations of training and public information activities, mainly focused on ASHRAE, ICC, federal and state government. Policy implication, which is Section Three, addresses the role of federal government and on-line training and public information activities in promoting training and public information (the current China training system lacks strong support of central government and on-line training activities). Conclusions are made in Section Four. This report will be uploaded to an upcoming Chinese website which is devoted to provide first-time free on-line training and public information of building energy codes in China.

Shui, Bin

2010-12-01T23:59:59.000Z

272

Evaluation and design of double-skin facades for office buildings in hot climates  

E-Print Network [OSTI]

efficient strategy and also the factors that affected this efficiency. The simulations were done using the building simulation software, Ener-Win. The double skin was simulated as per an approximate and simplistic calculation of the u-value, solar heat gain...

Yellamraju, Vijaya

2004-09-30T23:59:59.000Z

273

Sustainability Assessment of the Robert E. Johnson State Office Building, Final Report, Revised April 2002  

E-Print Network [OSTI]

’s northern facade is approximately 14 degrees west of north, exposing it to direct sunlight during the late afternoon hours in the winter. It is also important to note that the building contains over 50% glazing in the façade consisting of two types of energy...

Sylvester, K. E.; Song, S.; Haberl, J. S.; Turner, W. D.

2002-01-01T23:59:59.000Z

274

The Application and Energy Savings Potential of Occupancy Counters/Transmitters in Office Buildings  

E-Print Network [OSTI]

because the occupancy is below the design occupancy. In hot and humid climates, such as the Gulf Southwest, a considerable portion of the cooling energy in a commercial building is expended cooling and dehumidifying the air needed to maintain fresh air...

Medlin, J. W.

1987-01-01T23:59:59.000Z

275

Revisiting the 'Buy versus Build' decision for publicly owned utilities in California considering wind and geothermal resources  

SciTech Connect (OSTI)

The last two decades have seen a dramatic increase in the market share of independent, non-utility generators (NUGs) relative to traditional, utility-owned generation assets. Accordingly, the ''buy versus build'' decision facing utilities--i.e., whether a utility should sign a power purchase agreement (PPA) with a NUG, or develop and own the generation capacity itself--has gained prominence in the industry. Specific debates have revolved around the relative advantages of, the types of risk created by, and the regulatory incentives favoring each approach. Very little of this discussion has focused specifically on publicly owned electric utilities, however, perhaps due to the belief that public power's tax-free financing status leaves little space in which NUGs can compete. With few exceptions (Wiser and Kahn 1996), renewable sources of supply have received similarly scant attention in the buy versus build debate. In this report, we revive the ''buy versus build'' debate and apply it to the two sectors of the industry traditionally underrepresented in the discussion: publicly owned utilities and renewable energy. Contrary to historical treatment, this debate is quite relevant to public utilities and renewables because publicly owned utilities are able to take advantage of some renewable energy incentives only in a ''buy'' situation, while others accrue only in a ''build'' situation. In particular, possible economic advantages of public utility ownership include: (1) the tax-free status of publicly owned utilities and the availability of low-cost debt, and (2) the renewable energy production incentive (REPI) available only to publicly owned utilities. Possible economic advantages to entering into a PPA with a NUG include: (1) the availability of federal tax credits and accelerated depreciation schedules for certain forms of NUG-owned renewable energy, and (2) the California state production incentives available to NUGs but not utilities. This report looks at a publicly owned utility's decision to buy or build new renewable energy capacity--specifically wind or geothermal power--in California. To examine the economic aspects of this decision, we modified and updated a 20-year financial cash-flow model to assess the levelized cost of electricity under four supply options: (1) public utility ownership of new geothermal capacity, (2) public utility ownership of new wind capacity, (3) a PPA for new geothermal capacity, and (4) a PPA for new wind capacity.

Bolinger, Mark; Wiser, Ryan; Golove, William

2001-10-01T23:59:59.000Z

276

Continuous Commissioning® of a Single Fan Dual Duct System in an Office Building  

E-Print Network [OSTI]

boxes are independent boxes, which are operated in CAV modes. The building continuous commissioning was started on June 2004. It is being commissioned following the approaches used by the Energy Systems Laboratory at Nebraska University, which... in this case include installing VFD on the supply fan and return fan, updating all terminal boxes from CAV modes into VAV modes, resetting duct static pressure and supply air temperature, optimizing outside air intake and installing VFDs on chiller...

Dong, D.; Liu, M.

2005-01-01T23:59:59.000Z

277

STIL2 Swedish Office Buildings Survey - Datasets - OpenEI Datasets  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revisionEnvReviewNonInvasiveExplorationUT-g Grant ofRichardton Abbey Wind Farm(CTI PFAN)STIL2 Swedish Office

278

Reducing Data Center Loads for a Large-Scale, Net Zero Office Building Case Study  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion | Department ofT ib l L dDepartmentnews-flashes Office ofof Energy Redefining9

279

Office Buildings - Types of Office Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia,(Million Barrels) Crude Oil Reserves in Nonproducing ReservoirsYear-Month WeekReservesYear Jan Feb0 ' u o ! ) e j )

280

Management and monitoring of public buildings through ICT based systems: control rules for energy saving of lighting , J. Virgone2  

E-Print Network [OSTI]

infrastructure to manage appliances so as to effortlessly optimize energy efficiency usage (without compromising comfort for occupants) and to offer to decision makers dedicated tools to plan and manage energy savingTitle Management and monitoring of public buildings through ICT based systems: control rules

Paris-Sud XI, Université de

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Effects on Occupants of Enhanced Particle Filtration in a non-problem office environment: A Double-Blind Crossover Intervention Study  

E-Print Network [OSTI]

and Renewable Energy, Office of Building Technology, Stateand Renewable Energy, Office of Building Technology, State

Mendell, M.J.

2011-01-01T23:59:59.000Z

282

Study on Control Performance of HVAC System or Interior Zone and Perimeter Zone in Office Building; Estimation of Optimal PI Tuning in Cooling Operation  

E-Print Network [OSTI]

In office buildings there are generally two HVAC systems installed, one in the perimeter zone (PZ) and one in the interior zone (IZ), and the temperatures of each zone are independently controlled. In the present paper, in order to the solve problem...

Maehara, K.; Sagara, N.

2007-01-01T23:59:59.000Z

283

Building Technologies Office Window and Envelope Technologies Emerging Technologies R&D Program  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd:June 2015 < prev nextInvestigationofBuilding Technologies

284

University Communications The mission of the Office of University Communications is to enhance MSU's public  

E-Print Network [OSTI]

's public image, increase the public's awareness of MSU's accomplishments, and develop consistent production, graphics and many other creative services. · MSU Brand Toolkit: www to enhance the image and reputation of Montana State University. · Points of Excellence: www

Maxwell, Bruce D.

285

The Advantage of Highly Controlled Lighting for Offices and Commercial Buildings  

SciTech Connect (OSTI)

The paper presents results from pilot studies of new 'workstation-specific' luminaires that are designed to provide highly, efficient, customized lighting for open-office cubicles. Workstation specific luminaires have the following characteristics: (1) they provide separate, dimming control of the cubicle's 'ambient' and 'task' lighting components, (2) occupancy sensors and control photosensors are integrated into the fixture's design and operation, (3) luminaires can be networked using physical cabling, microcontrollers and a PC running control software. The energy savings, demand response capabilities and quality of light from the two WS luminaires were evaluated and compared to the performance of a static, low-ambient lighting system that is uncontrolled. Initial results from weeks of operation provide strong indication that WS luminaires can largely eliminate the unnecessary lighting of unoccupied cubicles while providing IESNA-required light levels when the cubicles are occupied. Because each cubicle's lighting is under occupant sensor control, the WS luminaires can capitalize on the fact cubicles are often unoccupied during normal working hours and reduce their energy use accordingly.

Rubinstein, Francis; Bolotov, Dmitriy; Levi, Mark; Powell, Kevin; Schwartz, Peter

2008-08-17T23:59:59.000Z

286

Security Checklist A publication of the Cornell University Office of Fraternities, Sororities & Independent Living  

E-Print Network [OSTI]

the outside? · Can windows be left open for ventilation be secured? · Are window air-conditioners secured from the landlord have a published policy about issuing and replacing keys? · Does the building have a doorman

Keinan, Alon

287

Reducing Data Center Loads for a Large-Scale, Net Zero Office Building (Brochure)  

SciTech Connect (OSTI)

Case study highlighting the design, implementation strategies, and continuous performance monitoring of NREL's Research Support Facility data center. In constructing a new research facility for its campus, the National Renewable Energy Laboratory (NREL) project team identified the opportunity to design a world-class, energy-efficient data center to support its operations. NREL's efforts resulted in a highly efficient data center that demonstrated considerable energy savings in its first 11 months of operations. Using legacy data center performance as a baseline, the new facility cut energy use by nearly 1,450,000 kWh, delivering cost savings of approximately $82,000. The data center's average total load was 165 kW less than the legacy center's average total load, resulting in a 60% reduction in overall power. Finally, the limited use of cooling and fan energy enabled the new data center to achieve a 1.16 average power utilization effectiveness (PUE) rating, compared to the legacy data center's PUE of 2.28. The laboratory had been relying on individual servers with an energy utilization rate of less than 5%. NREL employed building best practices, innovative design techniques and energy-efficient technologies to support its energy goals for the new data center. To counteract the extensive heat generated by data center equipment, the laboratory implemented a cooling system using outdoor air and evaporative cooling to meet most of the center's needs. Inside the data center, NREL replaced much of its legacy equipment with new, energy-efficient technology. By exchanging this infrastructure for virtualized blade servers, NREL reduced its server energy footprint by 96%. Additionally, NREL replaced its 80%-efficient uninterruptible power supply (UPS) with a UPS that is 95% efficient; deployed ultra efficient power distribution units (PDU) to handle higher UPS voltages; and implemented vacancy sensors to drive down lighting loads. Using best practices and energy-efficient technology, NREL was able to successfully design an optimized data center with a minimal energy footprint. At 958,000 kWh, the annual energy use for the RSF data center is approximately 60% less than the legacy data center's annual energy use, surpassing the laboratory's project goal. As specified, the building is equipped with enough onsite renewable energy generation to offset annual energy consumption. The facility has achieved a PUE of 1.16 and ERE of 0.91 in its first 11 months of operation and is using PUE to as a metric to gauge success towards its ultimate goal. Based on the status of its RSF data center project, NREL is advising other government organizations on data center efficiency. The laboratory places great emphasis on the use of key metrics - such as PUE and ERE - to track performance. By carefully monitoring these metrics and making adjustments, NREL is able to continuously improve the performance of its data center operations.

Not Available

2011-12-01T23:59:59.000Z

288

MASTER OF PUBLIC POLICY SANFORD SCHOOL  

E-Print Network [OSTI]

by seminar rooms, lecture halls, and faculty offices. On the ground floor, Fleishman Commons is a popular building, Rubenstein Hall, opened next door in 2005. It houses high-tech lecture halls and classrooms of Public Policy Professor of Public Policy #12;COMMUNITY Run, Cycle, Swim, Hike... Durham residents enjoy

Reif, John H.

289

PROGRESS IN ENERGY EFFICIENT BUILDINGS  

E-Print Network [OSTI]

Seven recent energy-efficient U.S. office buildings areSeven recent energy-efficient U.S. office buildings are18, 1983. PROGRESS IN ENERGY EFFICIENT BUILDINGS Leonard W.

Wall, L.W.

2009-01-01T23:59:59.000Z

290

Financing Turnkey Efficiency Solutions for Small Buildings and...  

Energy Savers [EERE]

Financing Turnkey Efficiency Solutions for Small Buildings and Small Portfolios Commercial Buildings Integration Project for the 2013 Building Technologies Office's...

291

The New House of the Region of Hannover - Building Energy Efficient in a Public Private Partnership  

E-Print Network [OSTI]

Public Private Partnerships are an increasingly popular approach to carry out public infra-structure projects. PPPs aim at reducing costs and risk and improving service and quality by using private expertise and management potential....

Schubert, T.; Plesser, S.

2008-01-01T23:59:59.000Z

292

Comparison of ASHRAE Standard 90.1, 189.1 and IECC Codes for Large Office Building in Texas), Energy Systems Laboratory, Texas A&M University.  

E-Print Network [OSTI]

herein is necessarily error-free. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not constitute or imply its endorsement, recommendation, or favoring by the Energy.... The comparison is carried out using the simulation model for a large office building initially developed by Ahmad et al. (2005) and Kim et al. (2009) using DOE-2.1e simulation program. The model has been updated and modified as per the requirements...

Mukhopadhyay, J.; Baltazar, J.C.; Kim,H.; Haberl, J.

2011-01-01T23:59:59.000Z

293

A Computer Analysis of Energy Use and Energy Conservation Options for a Twelve Story Office Building in Austin, Texas  

E-Print Network [OSTI]

the building. The energy consumption of the building was compared with the energy consumption of the building modified to comply with the proposed ASHRAE 90.1p standards. The base design and the ASHRAE design of the Travis building were evaluated in Brownsville...

Katipamula, S.; O'Neal, D. L.; Farad, M.

1986-01-01T23:59:59.000Z

294

Beardmore Building  

High Performance Buildings Database

Priest River, ID Originally built in 1922 by Charles Beardmore, the building housed offices, mercantile shops, a ballroom and a theater. After decades of neglect under outside ownership, Brian Runberg, an architect and great-grandson of Charles Beardmore, purchased the building in 2006 and began an extensive whole building historic restoration.

295

Simulation and Analysis of Energy Consumption of Public Building in Chongquig  

E-Print Network [OSTI]

Calculation and analysis of energy consumption must be on the base of simulation of building load. DeST is adopted to calculate dynamic cooling load of the main building in Chongqing city. Then water chilling unit's plant capability is checked...

Chen, G.; Lu, J.; Chen, J.

2006-01-01T23:59:59.000Z

296

Scotts Valley Energy Office and Human Capacity Building that will provide energy-efficiency services and develop sustainable renewable energy projects.  

SciTech Connect (OSTI)

The primary goal of this project is to develop a Scotts Valley Energy Development Office (SVEDO). This office will further support the mission of the Tribe's existing leadership position as the DOE Tribal Multi-County Weatherization Energy Program (TMCWEP) in creating jobs and providing tribal homes and buildings with weatherization assistance to increase energy efficiency, occupant comfort and improved indoor air quality. This office will also spearhead efforts to move the Tribe towards its further strategic energy goals of implementing renewable energy systems through specific training, resource evaluation, feasibility planning, and implementation. Human capacity building and continuing operations are two key elements of the SVEDO objectives. Therefore, the project will 1) train and employ additional Tribal members in energy efficiency, conservation and renewable resource analyses and implementation; 2) purchase materials and equipment required to implement the strategic priorities as developed by the Scotts Valley Tribe which specifically include implementing energy conservation measures and alternative energy strategies to reduce energy costs for the Tribe and its members; and 3) obtain a dedicated office and storage space for ongoing SVEDO operations.

Anderson, Temashio [Scotts Valley Band of Pomo Indians

2013-06-28T23:59:59.000Z

297

2014-04-30 Public Meeting Presentation Slides: Physical Characterization of Smart and Grid-Connected Commercial and Residential Buildings End-Use Equipment and Appliances  

Broader source: Energy.gov [DOE]

These documents contain slide decks presented at the Physical Characterization of Smart and Grid-Connected Commercial and Residential Buildings End-Use Equipment and Appliances public meeting held on April 30, 2014.

298

Evaluation of the near-term commercial potential of technologies being developed by the Office of Building Technologies  

SciTech Connect (OSTI)

This project developed an inventory of the Office of Building Technologies (OBT) from a survey administered in 1988 to program managers and principal investigators from OBT. Information provided on these surveys was evaluated to identify equipment and practices that are near-term opportunities for technology commercialization and to determine whether they needed some form of assistance from OBT to be successful in the marketplace. The near-term commercial potential of OBT technologies was assessed by using a technology selection screening methodology. The screening first identified those technologies that were ready to be commercialized in the next two years. The second screen identified the technologies that had a simple payback period of less than five years, and the third identified those that met a current need in the marketplace. Twenty-six OBT technologies met all the criteria. These commercially promising technologies were further screened to determine which would succeed on their own and which would require further commercialization support. Additional commercialization support was recommended for OBT technologies where serious barriers to adoption existed or where no private sector interest in a technology could be identified. Twenty-three technologies were identified as requiring commercialization support from OBT. These are categorized by each division within OBT and are shown in Table S.1. The methodology used could easily be adapted to screen other DOE-developed technologies to determine commercialization potential and to allocate resources accordingly. It provides a systematic way to analyze numerous technologies and a defensible and documented procedure for comparing them. 4 refs., 7 figs., 10 tabs.

Weijo, R.O. (Portland General Electric Co., OR (USA)); Nicholls, A.K.; Weakley, S.A.; Eckert, R.L.; Shankle, D.L.; Anderson, M.R.; Anderson, A.R. (Pacific Northwest Lab., Richland, WA (USA))

1991-03-01T23:59:59.000Z

299

Development of an integrated building load and ground source heat pump model to assess heat pump and ground loop design and performance in a commercial office building.  

E-Print Network [OSTI]

??Ground source heat pumps (GSHPs) offer an efficient method for cooling and heating buildings, reducing energy usage and operating cost. In hot, arid regions such… (more)

Blair, Jacob Dale

2014-01-01T23:59:59.000Z

300

Performance measures for evaluating public participation activities in DOE`s Office of Environmental Management  

SciTech Connect (OSTI)

Public participation in decision-making in the United States has become a dominant theme throughout the public sector and is increasingly used in the private sector. Recent reports by the National Research Council and the Commission on Risk Assessment and Risk Management, set up jointly by the White House and Congress, conclude that risk decisions must increasingly be structured in such a manner as to involve stakeholders meaningfully in the processes and activities leading to decisions and, perhaps, through decision implementation. Both of these reports indicate that decisions may take longer but be better if officials: (1) bring all interested and affected parties to the table at the beginning of the risk-discussion process; (2) identify relevant concerns, losses, exposures and other information the parties have; (3) address significant concerns through appropriate research; and (4) present findings in an understandable, accessible way. This report is intended to facilitate subsequent evaluations of public participation activities and programs.

Carnes, S.A.; Schweitzer, M.; Peelle, E.B.; Wolfe, A.K.; Munro, J.F.

1996-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Data Activities and Publications | OSTI, US Dept of Energy, Office of  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to UserProduct: CrudeOffice ofINL is a U.S.11-26-20131DarenData

302

Development of Energy Consumption Database Management System of Existing Large Public Buildings  

E-Print Network [OSTI]

The statistic data of energy consumption are the base of analyzing energy consumption. The scientific management method of energy consumption data and the development of database management system plays an important role in building energy...

Li, Y.; Zhang, J.; Sun, D.

2006-01-01T23:59:59.000Z

303

Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings  

Broader source: Energy.gov [DOE]

U.S. Department of Energy's Technical Assistance Program and SEE Action hosted this webinar on August 30, 2012, on retro-commissioning for energy efficiency in commercial buildings.

304

Evaluating Indoor Air Quality (IAQ) as Modifying Factor in Designing Public School Buildings in Jordan  

E-Print Network [OSTI]

.D. Hind Al-Momani Department of Architecture Jordan University of Science and Technology Irbid-Jordan Hikmat_ali@yahoo.com Hikmat@just.edu.jo Phone... http://www.consumer voice usa.com, sick building and toxic mold.27/3/2003 http://www.consumer voice usa.com, do you have a ?sick building ?? 27/3/2003 http://www.epa.gov/iaq/schools/tfs/guide5.html. IAQ tools for schools kit ?IAQ coordinator...

Ali, H. H.; Al-Momani, H.

2004-01-01T23:59:59.000Z

305

Continuous Energy Management of the HVAC&R System in an Office Building System Operation and Energy Consumption for the Eight Years after Building Completion  

E-Print Network [OSTI]

The authors continuously studied the energy consumption of a heating, ventilating, air- conditioning and refrigerating (HVAC&R) system in an office for the operation of the system in terms of its expected performance. A fault in the system control...

Akashi, Y.; Shinozaki, M.; Kusuda, R.; Ito, S.

2006-01-01T23:59:59.000Z

306

Office Buildings - Energy Consumption  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2007 10,998 9,933 10,998 10,643 10,998through 1996) inDecadeDecade Year-0Year Jan Feb Mar AprEnergy

307

Office Buildings - Full Report  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2007 10,998 9,933 10,998 10,643 10,998through 1996) inDecadeDecade Year-0Year Jan Feb Mar AprEnergyPDF

308

Office Buildings - Full Report  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia,(Million Barrels) Crude Oil Reserves in Nonproducing ReservoirsYear-Month WeekReservesYear Jan Feb0 ' u o ! ) e j ) s

309

Building Technologies Office  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd:June 2015 < prev nextInvestigationof EnergyStandards

310

Building Technologies Office Overview  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up fromDepartmentTie Ltd:June 2015 < prev nextInvestigationof

311

Emerging from stasis : a new typology for the public building in centro Havana/  

E-Print Network [OSTI]

This project proposes a new public institution for the most dense and deteriorated zone of Havana, Cuba. This new institution aims to capitalize on existing social networks which, consolidated and enhanced, might provide ...

Lacy, Ethan J. (Ethan John)

2010-01-01T23:59:59.000Z

312

Building upon ruins : the evolution of an urban artifact from infrastructure to public space  

E-Print Network [OSTI]

A thesis is about what architecture can be. In my thesis I propose that urban infrastructure built in the late nineteenth-century, can be the foundation for urban public space in the late twentieth-century. I propose that ...

Passavanti, Lenore Antonia

1994-01-01T23:59:59.000Z

313

Communications and Public Affairs | U.S. DOE Office of Science (SC)  

Office of Science (SC) Website

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched5 Industrial Carbon CaptureFY08Intermittent3,19963xinyufuCommunications and Public

314

Public Affairs and Intergovernmental Relations | U.S. DOE Office of Science  

Office of Science (SC) Website

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched5 IndustrialIsadore Perlman, 1960 TheOrganizationProcesses(SC) Public Affairs and

315

Moisture Durability of Vapor Permeable Insulating Sheathing (Fact Sheet), Building America Case Study: Technology Solutions for New and Existing Homes, Building Technologies Office (BTO)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't32Department of Energy Modular CHP System for

316

Multifamily Individual Heating and Ventilation Systems, Lawrence, Massachusetts (Fact Sheet), Building America Case Study: Whole-House Solutions for Existing Homes, Building Technologies Office (BTO)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't32Department ofMoving Away from SilosEnergyMultifamily

317

Nexus EnergyHomes, Frederick, Maryland (Fact Sheet), Building America Case Study: Whole-House Solutions for New Homes, Building Technologies Office (BTO)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorgeDoesn't32DepartmentWells |ofDepartment ofLive Fish | DepartmentNexus

318

Plug-in Electric Vehicle Interactions with a Small Office Building: An Economic Analysis using DER-CAM  

E-Print Network [OSTI]

workdays. Index Terms-- battery storage, building managementvehicle battery packs for grid storage,” J. of Powerstorage but not to consume any net energy from the battery.

Momber, Ilan

2010-01-01T23:59:59.000Z

319

Rating the energy performance of buildings  

E-Print Network [OSTI]

Energy and Sustainable Buildings, 2004 Available at http://Energy and Sustainable Buildings, Vol. 3, (2004), Olofsson,for a commercial office building in Melbourne, Australia,

Olofsson, Thomas; Meier, Alan; Lamberts, Roberto

2004-01-01T23:59:59.000Z

320

commercial buildings initiative | netl.doe.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Commercial Buildings Initiative The DOE Building Technologies Office works with the commercial building industry to accelerate the use of energy efficiency technologies in both...

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Occupant satisfaction with indoor environmental quality in green buildings  

E-Print Network [OSTI]

Environmental Quality in Green Buildings S. Abbaszadeh 1 ,office buildings, comparing green with non-green buildings.On average, occupants in green buildings were more satisfied

Abbaszadeh, S.; Zagreus, Leah; Lehrer, D.; Huizenga, C

2006-01-01T23:59:59.000Z

322

Optimization of a Solar Chimney Design to Enhance Natural Ventilation in a Multi-Storey Office Building  

E-Print Network [OSTI]

Natural ventilation of buildings can be achieved with solar-driven , buoyancy-induced airflow through a solar chimney channel. Research on solar chimneys has covered a wide range of topics, yet study of the integration in multi-storey buildings has...

Gontikaki, M.; Trcka, M.; Hensen, J.; Hoes, P. J.

2010-01-01T23:59:59.000Z

323

Identifying Sources of Volatile Organic Compounds and Aldehydes in a High Performance Building  

E-Print Network [OSTI]

Efficiency and Renewable Energy, Building Technologiesand Renewable Energy, Office of Building Technology, State,

Ortiz, Anna C.

2010-01-01T23:59:59.000Z

324

Replacement, Variable-Speed Motors for Furnaces, Syracuse, New York (Fact Sheet), Building America Case Study: Technology Solutions for New and Existing Homes, Building Technologies Office (BTO)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energy fromComments on NBPSitingPresentationEnergyReplacement of

325

Stand-Off Furring in Deep Energy Retrofits, Syracuse, New York (Fact Sheet), Building America Case Study: Technology Solutions for New and Existing Homes, Building Technologies Office (BTO)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof the AmericasDOE-STD-3020-2005 DecemberSpurring

326

The Economics of Green Building  

E-Print Network [OSTI]

Benjamin. "Do LEED-Certified Buildings Save Energy? Yes,But,." Energy and Buildings, 2009, 41, pp. 897-905. Royalrating, and publicizing buildings along these dimensions (

Eichholtz, Piet; Kok, Nils; Quigley, John M.

2010-01-01T23:59:59.000Z

327

2014-09-30 Issuance: Buildings-to-Grid Integration and Related Areas of Research; Notice of Availability and Request for Public Comment  

Broader source: Energy.gov [DOE]

This document is a pre-publication Federal Register notice of availability and request for public comment regarding buildings-to-grid integration and related areas of research, as issued by the Deputy Assistant Secretary for Energy Efficiency on September 30, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

328

Plan Your Route to Success BUSINESS AND SOCIAL INNOVATION | BUILDING STRONG LEADERS | FROM THE CORNER OFFICE | HOUSE OF BRANDS  

E-Print Network [OSTI]

Plan Your Route to Success BUSINESS AND SOCIAL INNOVATION | BUILDING STRONG LEADERS | FROM for companies with a diverse brand portfolio? 14 Where Business and Social Innovation Meet How three companies

Huang, Jianyu

329

Get Smart About Energy: Office of Building Technology, State and Community Programs (OBT) EnergySmart Schools Program Folder (Revision)  

SciTech Connect (OSTI)

While improving their energy use in buildings and bus fleets, schools are likely to create better places for teaching and learning with better lighting, temperature control, acoustics, and air quality. Smart districts also realize benefits in student performance.

Not Available

2002-02-01T23:59:59.000Z

330

EA-1107: Construction and Operation of a Office Building at the Stanford Linear Accelerator Center, Berkeley, California  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of the proposed project to modify existing Building 51B at the U.S. Department of Energy's Lawrence Berkeley National Laboratory to install and conduct...

331

Winchester Homes and Camberley Homes, Silver Spring, Maryland (Fact Sheet), Building America Case Study: Whole-House Solutions for New Homes, Building Technologies Office (BTO)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of EnergyofProject isNovember 07, 2007What Is theEnergyConcept to 3EFFICIENCY

332

Winchester Homes and Camberley Homes, Silver Spring, Maryland (Fact Sheet), Building America Case Study: Whole-House Solutions for New Homes, Building Technologies Office (BTO)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of EnergyofProject isNovember 07, 2007What Is theEnergyConcept to 3EFFICIENCY

333

Greening existing buildings with LEED-EB!  

E-Print Network [OSTI]

The market of existing office buildings is going green. While early adopters of green buildings were owner-occupiers, there is a current wave of nonowner-occupied office buildings seeking Leadership in Energy and Environmental ...

Dirksen, Tyson H

2008-01-01T23:59:59.000Z

334

Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Earthquake Engineering and Structural Dynamics Engineering Institute Publications-Earthquake Engineering and Structural Dynamics Contact Institute Director Charles Farrar (505)...

335

DB-Netz AG Offices  

High Performance Buildings Database

Hamm, Germany The new office building for DB Netz AG was designed by the collaborative team of Architrav Architects and the Buildings Physics and Technical Building Services group of the University of Karlsruhe. The team developed an energy efficient building concept for the 64,304 sqft office building, located in Hamm, Germany. The design concept of the building is dominated by architectural solutions for ventilation, cooling and lighting. Use of HVAC and electric lighting is minimized as much as possible.

336

Buried and Encapsulated Ducts, Jacksonville, Florida (Fact Sheet), Building America Case Study: Technology Solutions for New and Existing Homes, Building Technologies Office (BTO)  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in Review: Top FiveDepartment of Energy BuildingsBuried and Encapsulated Ducts

337

Window Use in Mixed-Mode Buildings: A Literature Review  

E-Print Network [OSTI]

user behaviour in low-energy office buildings, Solar EnergyDesigns for low-energy office buildings increasinglythe new low- hanging fruit for improving a building’s energy

Ackerly, Katie; Baker, Lindsay; Brager, Gail

2011-01-01T23:59:59.000Z

338

ORISE: Capacity Building  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Capacity Building Because public health agencies must maintain the resources to respond to public health challenges, critical situations and emergencies, the Oak Ridge Institute...

339

Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Publications-Sensors and Sensing Technologies Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff...

340

Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Engineering Institute Publications-Damage Prognosis Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff...

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Skip navigation links Newsroom About Us Freedom of Information Act Investor Relations Library Privacy Publications Audits Fact Sheets Hiring Reconstruction Reports Journal Maps...

342

Geothermal Technologies Office: Publications  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdfFuel Cell VehicleEnergy (5 Activities)OctoberGeothermal Technologies

343

Bioenergy Technologies Office: Publications  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE: Alternative FuelsBSCmemo.pdf BSCmemo.pdf BSCmemo.pdfBetterBIOENERGY TECHNOLOGIES OFFICEInformation

344

Special Building Renovations  

Broader source: Energy.gov [DOE]

A number of building types have specific energy uses and needs, and as such the renewable opportunities may be different from a typical office building. This section briefly discusses the following...

345

UC Sustainability Office Report  

E-Print Network [OSTI]

1 UC Sustainability Office Report Introduction Welcome to the second annual UC Sustainability Office Report. 2012 saw the Sustainability Office focus its attentions on enhancing the student experience and building on UC's statement of strategic intent of `people prepared to make a difference'. We

Hickman, Mark

346

A SIMULATION ASSESSMENT OF THE HEIGHT OF LIGHT SHELVES TO ENHANCE DAYLIGHTING QUALITY IN TROPICAL OFFICE BUILDINGS UNDER OVERCAST SKY CONDITIONS IN DHAKA, BANGLADESH  

E-Print Network [OSTI]

The objective of this paper is to highlight the effectiveness of light shelves in tropical office buildings to enhance interior daylighting quality. Daylight simulation was performed for custom light shelves for a typical office floor of Dhaka City in Bangladesh, to determine the best possible location under overcast sky conditions. Six alternative models of a 3m high study space were created with varying heights of light shelves. The 3D models were first generated in the Ecotect to study the distribution and uniformity of daylight in the interior space with splitflux method. These models were then exported to a physically-based backward raytracer, Radiance Synthetic Imaging software to generate realistic lighting levels for validating and crosschecking the Ecotect results. The results showed that for achieving light levels closest to specified standards, light shelves at a height of 2m above floor level perform better among the seven alternatives studied including the alternative where no light shelves are present. Finally, the decisions were verified with DAYSIM simulation program to ensure the compliance of the decisions with dynamic annual climate-based daylight performance metrics.

Md. Ashikur; Rahman Joarder; Zebun Nasreen Ahmed; Andrew Price; Monjur Mourshed

347

Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout Â… Energy Saving Homes, Buildings, and Manufacturing  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergyDepartment of Energy(National1 -OSSGasofOfficeKathleen Hogan, Deputy

348

An Analysis of the DER Adoption Climate in Japan Using Optimization Results for Prototype Buildings with U.S. Comparisons  

E-Print Network [OSTI]

hour hour Fig. 8. Office Building Jul Electricity Use y Fig.9. Office Building Jul Electricity Load Provision with CHPEnergy Systems (IES) for Buildings: A Market Assessment,

Zhou, Nan; Marnay, Chris; Firestone, Ryan; Gao, Weijun; Nishida, Masaru

2006-01-01T23:59:59.000Z

349

Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromising Science for PlutoniumAboutAbout / Public UsePublications

350

Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromising Science for PlutoniumAboutAbout / PublicPublications

351

INL Green Building Strategy  

SciTech Connect (OSTI)

Green buildings, also known as sustainable buildings, resource efficient buildings, and high performance buildings, are structures that minimize the impact on the environment by using less energy and water, reducing solid waste and pollutants, and limiting the depletion of natural resources. As Idaho National Laboratory (INL) becomes the nation’s premier nuclear energy research laboratory, the physical infrastructure will be established to help accomplish the mission. This infrastructure, particularly the buildings, should incorporate green design features in order to be environmentally responsible and reflect an image of progressiveness and innovation to the public and prospective employees. With this in mind, the recommendations described in this strategy are intended to form the INL foundation for green building standards. The recommendations in this strategy are broken down into three levels: Baseline Minimum, Leadership in Energy and Environmental Design (LEED)Certification, and Innovative. Baseline Minimum features should be included in all new occupied buildings no matter what the purpose or size. These features do not require significant research, design, or capital costs and yet they can reduce Operation and Maintenance (O&M) costs and produce more environmentally friendly buildings. LEED Certification features are more aggressive than the Baseline Minimums in that they require documentation, studies, and/or additional funding. Combined with the Baseline Minimums, many of the features in this level will need to be implemented to achieve the goal of LEED certification. LEED Silver certification should be the minimum goal for all new buildings (including office buildings, laboratories, cafeterias, and visitor centers) greater than 25,000 square feet or a total cost of $10 million. Innovative features can also contribute to LEED certification, but are less mainstream than those listed in the previous two levels. These features are identified as areas where INL can demonstrate leadership but they could require significant upfront cost, additional studies, and/or development. Appendix A includes a checklist summary of the INL Green Building Strategy that can be used as a tool during the design process when considering which green building features to include. It provides a quick reference for determining which strategies have lower or no increased capital cost, yield lower O&M costs, increase employee productivity, and contribute to LEED certification.

Jennifer Dalton

2005-05-01T23:59:59.000Z

352

Academic Buildings Student & Admin.  

E-Print Network [OSTI]

Academic Buildings Student & Admin. Services Residence Public Parking Permit Parking GatheringCampusRoad Shrum Science Centre South Sciences Building Technology & Science Complex 2 Greenhouses Science Research AnnexBee Research BuildingAlcan Aquatic Research Technology & Science Complex 1 C Building B Building P

353

Classification Documents and Publications  

Broader source: Energy.gov [DOE]

Certain documents and publications created or issued by the Office of Classification are available from this page.

354

A Pilot Study of the Effectiveness of Indoor Plants for Removal of Volatile Organic Compounds in Indoor Air in a Seven-Story Office Building  

SciTech Connect (OSTI)

The Paharpur Business Centre and Software Technology Incubator Park (PBC) is a 7 story, 50,400 ft{sup 2} office building located near Nehru Place in New Delhi India. The occupancy of the building at full normal operations is about 500 people. The building management philosophy embodies innovation in energy efficiency while providing full service and a comfortable, safe, healthy environment to the occupants. Provision of excellent Indoor Air Quality (IAQ) is an expressed goal of the facility, and the management has gone to great lengths to achieve it. This is particularly challenging in New Delhi, where ambient urban pollution levels rank among the worst on the planet. The approach to provide good IAQ in the building includes a range of technical elements: air washing and filtration of ventilation intake air from rooftop air handler, the use of an enclosed rooftop greenhouse with a high density of potted plants as a bio-filtration system, dedicated secondary HVAC/air handling units on each floor with re-circulating high efficiency filtration and UVC treatment of the heat exchanger coils, additional potted plants for bio-filtration on each floor, and a final exhaust via the restrooms located at each floor. The conditioned building exhaust air is passed through an energy recovery wheel and chemisorbent cartridge, transferring some heat to the incoming air to increase the HVAC energy efficiency. The management uses 'green' cleaning products exclusively in the building. Flooring is a combination of stone, tile and 'zero VOC' carpeting. Wood trim and finish appears to be primarily of solid sawn materials, with very little evidence of composite wood products. Furniture is likewise in large proportion constructed from solid wood materials. The overall impression is that of a very clean and well-kept facility. Surfaces are polished to a high sheen, probably with wax products. There was an odor of urinal cake in the restrooms. Smoking is not allowed in the building. The plants used in the rooftop greenhouse and on the floors were made up of a number of species selected for the following functions: daytime metabolic carbon dioxide (CO{sub 2}) absorption, nighttime metabolic CO{sub 2} absorption, and volatile organic compound (VOC) and inorganic gas absorption/removal for air cleaning. The building contains a reported 910 indoor plants. Daytime metabolic species reported by the PBC include Areca Palm, Oxycardium, Rubber Plant, and Ficus alii totaling 188 plants (21%). The single nighttime metabolic species is the Sansevieria with a total of 28 plants (3%). The 'air cleaning' plant species reported by the PBC include the Money Plant, Aglaonema, Dracaena Warneckii, Bamboo Palm, and Raphis Palm with a total of 694 plants (76%). The plants in the greenhouse (Areca Palm, Rubber Plant, Ficus alii, Bamboo Palm, and Raphis Palm) numbering 161 (18%) of those in the building are grown hydroponically, with the room air blown by fan across the plant root zones. The plants on the building floors are grown in pots and are located on floors 1-6. We conducted a one-day monitoring session in the PBC on January 1, 2010. The date of the study was based on availability of the measurement equipment that the researchers had shipped from Lawrence Berkeley National Lab in the U.S.A. The study date was not optimal because a large proportion of the regular building occupants were not present being New Year's Day. An estimated 40 people were present in the building all day during January 1. This being said, the building systems were in normal operations, including the air handlers and other HVAC components. The study was focused primarily on measurements in the Greenhouse and 3rd and 5th floor environments as well as rooftop outdoors. Measurements included a set of volatile organic compounds (VOCs) and aldehydes, with a more limited set of observations of indoor and outdoor particulate and carbon dioxide concentrations. Continuous measurements of Temperature (T) and relative humidity (RH) were made selected indoor and outdoor locations.

Apte, Michael G.; Apte, Joshua S.

2010-04-27T23:59:59.000Z

355

Building Energy Codes Program Overview - 2014 BTO Peer Review...  

Broader source: Energy.gov (indexed) [DOE]

of Energy This presentation at the 2014 Peer Review provided an overview of the Building Technologies Office's Building Building Energy Codes Program activities. Through...

356

Vol. 9: Building America Best Practices Series - Builders Challenge...  

Energy Savers [EERE]

EEBA Builder's Guides - Building America Top Innovation Building Science-Based Climate Maps - Building America Top Innovation Weatherization & Intergovernmental Programs Office...

357

Transforming Commercial Building Operations - 2013 BTO Peer Review...  

Energy Savers [EERE]

- 2013 BTO Peer Review Transforming Commercial Building Operations - 2013 BTO Peer Review Commercial Buildings Integration Project for the 2013 Building Technologies Office's...

358

Public Assembly Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

are those in which people gather for social or recreational activities, whether in private or non-private meeting halls. Basic Characteristics See also: Equipment |...

359

Public Assembly Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2007 10,998 9,933 10,998 10,643 10,998throughThousand CubicWashington Natural Gas Exports2. Types

360

NREL: Buildings Research - Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the Contributions and Achievements of WomenEvents Below are upcoming events

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Move In/Out Checklist A publication of the Cornell University Office of Fraternities, Sororities & Independent Living  

E-Print Network [OSTI]

a charge for removal of abandoned personal items from the apartment or the apartment building. It is also Patio/balcony Storage space Stairs/Rails Windows condition cracked/broken? Laundry facilities #12;Move

Keinan, Alon

362

April 30 Public Meeting: Physical Characterization of Smart and Grid-Connected Commercial and Residential Building End-Use Equipment and Appliances  

Broader source: Energy.gov [DOE]

These documents contain slide decks presented at the Physical Characterization of Smart and Grid-Connected Commercial and Residential Buildings End-Use Equipment and Appliances public meeting held on April 30, 2014. The first document includes the first presentation from the meeting: DOE Vision and Objectives. The second document includes all other presentations from the meeting: Terminology and Definitions; End-User and Grid Services; Physical Characterization Framework; Value, Benefits & Metrics.

363

TOLEDO BETTERS BUILDINGS WITH FINANCING OPTIONS | Department...  

Energy Savers [EERE]

upgrades and financing for buildings, from offices and schools to firehouses and wastewater plants, emphasizing how building owners could save on energy costs while increasing...

364

NREL: Buildings Research - Webinar Rescheduled: Material Handling...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

attend this webinar. Printable Version Buildings Research Home Commercial Buildings Residential Buildings Facilities Working with Us Publications News Did you find what you...

365

Building organizational technical capabilities: a new approach to address the office of environmental management cleanup challenges in the 21. century  

SciTech Connect (OSTI)

The United States Department of Energy (DOE), Office of Environmental Management (EM) is responsible for the nations nuclear weapons program legacy wastes cleanup. The EM cleanup efforts continue to progress, however the cleanup continues to be technologically complex, heavily regulated, long-term, and a high life cycle cost estimate (LCCE) effort. Over the past few years, the EM program has undergone several changes to accelerate its cleanup efforts with varying degrees of success. Several cleanup projects continued to experience schedule delays and cost growth. The schedule delays and cost growth have been attributed to several factors such as changes in technical scope, regulatory and safety considerations, inadequacy of acquisition approach and project management. This article will briefly review the background and schools of thought on strategic management and organizational change practiced in the United States over the last few decades to improve an organisation's competitive edge and cost performance. The article will briefly review examples such as the change at General Electric, and the recent experience obtained from the nuclear industry, namely the long-term response to the 1986 Chernobyl accident. The long-term response to Chernobyl, though not a case of organizational change, could provide some insight in the strategic management approaches used to address people issues. The article will discuss briefly EM attempts to accelerate cleanup over the past few years, and the subsequent paradigm shift. The paradigm shift targets enhancing and/or creating organizational capabilities to achieve cost savings. To improve its ability to address the 21. century environmental cleanup challenges and achieve cost savings, EM has initiated new corporate changes to develop new and enhance existing capabilities. These new and enhanced organizational capabilities include a renewed emphasis on basics, especially technical capabilities including safety, project management, acquisition management and people. The new enhanced organizational capabilities coupled with more effective communications; oversight and decision-making processes are expected to help EM meet the 21. century challenges. This article will focus on some of the initiatives to develop and enhance organizational technical capabilities. Some of these development initiatives are a part of DOE corporate actions to respond to the Defense Nuclear Facilities Safety Board (DNFSB) recommendations 93-3 and 2004-1. Other development initiatives have been tailored to meet EM specific needs for organizational capabilities such as case studies analysis and cost estimating. (authors)

Fiore, J.J.; Rizkalla, E.I. [Office of Environmental Management, The United States Dept. of Energy, Washington, D.C. (United States)

2007-07-01T23:59:59.000Z

366

The Lovejoy Building  

High Performance Buildings Database

Portland, OR Originally built in 1910 as the stables for the Marshall-Wells Hardware Company, the Lovejoy Building is the home of Opsis Architects. The owner/architects purchased and renovated the historic building to house their growing business and to provide ground-floor office lease space and second-floor offices for their firm. Opsis wanted to use the building to experience and demonstrate the technologies and practices it promotes with clients.

367

Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromising Science for PlutoniumAboutAbout / Public Use ofdefault

368

Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromising Science for PlutoniumAboutAbout / Public Use

369

Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromising Science for PlutoniumAboutAbout / Public

370

Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromising Science for PlutoniumAboutAbout /Lee » Publications

371

Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearch Welcome to theNewsCenter for GasNews &Publications

372

Sportsfield Service Building  

E-Print Network [OSTI]

Bank Office Building Parking R 0.1 Regis Center for Art - West 0.02 Rarig Center 0.31 Middlebrook HallHumphrey Center Hubert H. 0.4 Sportsfield Service Building 0.74 Bierman Track and Field Stadium 0/Nagurski Football Facility 0.44 UTEC Bldg 717 East River Parkway Heating Plant Storage Building 0.25 Education

Webb, Peter

373

Proceedings of the SPIE, Vol. 3700, April 6-8, 1999. This work was supported by the Assistant Secretary for Energy Efficiency and Renewable Energy, Office of Building  

E-Print Network [OSTI]

through components of building thermal envelopes. Two thermal chambers maintain steady-state heat flow the barrier between the outdoor weather and conditioned inside space. A building's thermal envelope consists to increase the efficiency of building heating and cooling. Heat flow through the building thermal envelope

374

Building Research & Information (2000) 28(5-6), 394-402 This work was supported by the Assistant Secretary for Energy Efficiency and Renewable Energy, Office  

E-Print Network [OSTI]

, this collaboration must continue throughout the building lifecycle, from construction, commissioning and operation

375

Thesis office Internship office  

E-Print Network [OSTI]

Thesis office Internship office Servicedesk Smartstudie Look at the thesis project flowchart when (education). Submit your thesis application form to: ThesisOffice-TNW@tudelft.nl. At the internship office you can find information about internships, other student experiences and tips. Contact: Internship

376

BuildSmart NY Innovators Summit Offers Sneak Peek at Better Buildings...  

Broader source: Energy.gov (indexed) [DOE]

prisons, mental health hospitals, office buildings, and facilities that house its trains, buses, and equipment. The New York Power Authority's BuildSmart NY program is...

377

Charting a Path to Net Zero Energy: Public-Private Sector Perspectives of the Commercial Buildings Consortium  

E-Print Network [OSTI]

Transforming the commercial buildings market to become "net-zero-energy-capable" will require dramatically lower levels of energy use sector wide. A comprehensive and concerted industry effort, partnering with utilities and government, must...

Harris, J.

2011-01-01T23:59:59.000Z

378

Europaisches Patentamt European Patent Office  

E-Print Network [OSTI]

Europaisches Patentamt European Patent Office Office europeen des brevets ® Publication number: o 303 459 A2 @ EUROPEAN PATENT APPLICATION ® Application number: 88307391.8 @ Int. C1.4: C 12 Q 1

Church, George M.

379

Green Building Requirement  

Broader source: Energy.gov [DOE]

The District of Columbia City Council enacted [http://dcclims1.dccouncil.us/images/00001/20061218152322.pdf B16-515] on December 5, 2006, establishing green building standards for public buildings...

380

Independent Activity Report, Los Alamos Site Office - December...  

Broader source: Energy.gov (indexed) [DOE]

December 2010 Los Alamos Site Office, Office of Quality Assurance Assessment of the Chemistry and Metallurgy Research Building Replacement Project Quality Assurance Plan The U.S....

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Human Behavior Meets Building Intelligence: How Occupants Respond to “Open Window” Signals  

E-Print Network [OSTI]

ABSTRACT Designs for low-energy buildings increasinglyDesigns for low-energy office buildings increasingly

Ackerly, Katie; Brager, Gail

2012-01-01T23:59:59.000Z

382

Environmental Assessment for Authorizing the Puerto Rico Electric Power Authority (PREPA) to allow Public Access to the Boiling Nuclear Superheat (BONUS) Reactor Building, Rincon, Puerto Rico  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) proposes to consent to a proposal by the Puerto Rico Electric Power Authority (PREPA) to allow public access to the Boiling Nuclear Superheat (BONUS) reactor building located near Rincon, Puerto Rico for use as a museum. PREPA, the owner of the BONUS facility, has determined that the historical significance of this facility, as one of only two reactors of this design ever constructed in the world, warrants preservation in a museum, and that this museum would provide economic benefits to the local community through increased tourism. Therefore, PREPA is proposing development of the BONUS facility as a museum.

N /A

2003-02-24T23:59:59.000Z

383

Shades of gray : race, class and coalition building in the fight to save New Orleans' public housing  

E-Print Network [OSTI]

To what extent does the opposition to planned demolition of New Orleans' public housing engage leadership and participation across race and class lines? In the wake of Hurricane Katrina, the Housing Authority of New Orleans ...

Wilch, Rachel Meredith

2007-01-01T23:59:59.000Z

384

2008 BUILDING ENERGY EFFICIENCY STANDARDS  

E-Print Network [OSTI]

2008 BUILDING ENERGY EFFICIENCY STANDARDS C A L I F O R N I A E N E RGY CO M M I S S I O N Buildings and Appliances Office #12;Acknowledgments The Building Energy Efficiency Standards (Standards the adoption of the 2008 Building Energy Efficiency Standards to Jon Leber, PE, (November 13, 1947 - February

385

Joseph Vance Building, The  

High Performance Buildings Database

Seattle, WA In 2006, the Rose Smart Growth Investment Fund acquired the historic Joseph Vance Building with the purpose of transforming it into "the leading green and historic class B" building in the marketplace. The terra cotta Vance Building was constructed in 1929 and has 14 floors - 13 floors of offices over ground-floor retail with a basement for mechanical equipment and storage. In 2009 the U.S. Green Building Council (USGBC) awarded the Vance Building LEED for Existing Buildings (EB) Gold certification.

386

Office of Energy Efficiency and Renewable Energy Fiscal Year...  

Office of Environmental Management (EM)

Energy Saving Homes, Buildings, and Manufacturing Office of Energy Efficiency and Renewable Energy Fiscal Year 2014 Budget Rollout - Energy Saving Homes, Buildings, and...

387

Building America Report Template  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

January 27 and 28, 2014 Denver, Colorado Prepared for The U.S. Department of Energy's Building America Program Office of Energy Efficiency and Renewable Energy Prepared by Sam...

388

1994 Building energy codes and standards workshops: Summary and documentation  

SciTech Connect (OSTI)

During the spring of 1994, Pacific Northwest Laboratory (PNL), on behalf of the U.S. Department of Energy (DOE) Office of Codes and Standards, conducted five two-day Regional Building Energy Codes and Standards workshops across the United States. Workshops were held in Chicago, Philadelphia, Atlanta, Dallas, and Denver. The workshops were designed to benefit state-level officials including staff of building code commissions, energy offices, public utility commissions, and others involved with adopting/updating, implementing, and enforcing state building codes in their states. The workshops provided an opportunity for state and other officials to learn more about the Energy Policy Act of 1992 (EPAct) requirements for residential and commercial building energy codes, the Climate Change Action Plan, the role of the U.S. Department of Energy and the Building Energy Standards Program at Pacific Northwest Laboratory, the commercial and residential codes and standards, the Home Energy Rating Systems (HERS), Energy Efficient Mortgages (EEM), training issues, and other topics related to the development, adoption, implementation, and enforcement of building energy codes. In addition to receiving information on the above topics, workshop participants were also encouraged to inform DOE of their needs, particularly with regard to implementing building energy codes, enhancing current implementation efforts, and building on training efforts already in place. This paper documents the workshop findings and workshop planning and follow-up processes.

Sandahl, L.J.; Shankle, D.L.

1994-09-01T23:59:59.000Z

389

Pennsylvania Department of Environmental Protection's Cambria Office  

High Performance Buildings Database

Ebensburg, PA The Pennsylvania Department of Environmental Protection's second green office building, Cambria, has more green features and a higher level of environmental awareness than PA DEP's first building--the South Central Regional Office Building. This 36,000 ft2 facility, designed for approximately 125 occupants, has collected data and documented many facets of its green design initiatives.

390

Europaisches Patent Office  

E-Print Network [OSTI]

(19) (12) Europaisches Patentamt European Patent Office Office europeen des brevets 11111~11111111111111111"11111111111111111"11""1111111111II~,,~1111 (11) EP 2 356 668 81 EUROPEAN PATENT SPECIFICATION (86) International application number: PCT/US2009/065891 (45) Date of publication and mention of the grant of the patent: 17.07.2013 Bulletin

Vertes, Akos

391

Business Case for Energy Efficient Building Retrofit and Renovation...  

Energy Savers [EERE]

More Documents & Publications Energy Efficiency Trends in Residential and Commercial Buildings - August 2010 Marketing and Market Transformation Building America...

392

Better Buildings Network View | May 2014 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

May 2014 More Documents & Publications Better Buildings Network View | July-August 2014 Better Buildings Network View | June...

393

Green Buildings in Green Cities: Integrating Energy Efficiency into the Real Estate Industry  

E-Print Network [OSTI]

Doing Good? Green Office Buildings. American Economic ReviewEnergy Effriciency in Commercial Buildings in Operation.Energy and Buildings. 43(11): 3106-3111. Ezovski, Derek.

Bardhan, Ashok; Kroll, Cynthia A.

2011-01-01T23:59:59.000Z

394

Demand Shifting with Thermal Mass in Large Commercial Buildings in a California Hot Climate Zone  

E-Print Network [OSTI]

of Cooling Strategies and Building Features on EnergyPerformance of Office Buildings. ”Energy and Buildings 34(2002): Braun, J. E. 1990. “Reducing

Xu, Peng

2010-01-01T23:59:59.000Z

395

Participation through Automation: Fully Automated Critical Peak Pricing in Commercial Buildings  

E-Print Network [OSTI]

Figure 2. Demand Response Automation Server and BuildingDemand Response Control Strategies in Commercial Buildings,X X Example of Demand Response from an Office Building This

Piette, Mary Ann; Watson, David S.; Motegi, Naoya; Kiliccote, Sila; Linkugel, Eric

2006-01-01T23:59:59.000Z

396

Building public trust: Actions to respond to the report of the Advisory Committee on human radiation experiments  

SciTech Connect (OSTI)

Democratic government requires trust: people need to know and believe that the government is telling the truth. Without information about what the government is doing and why, citizens cannot exercise democratic control over government institutions. During his first year in office, President Clinton became concerned about reports that the government had conducted unethical secret human radiation experiments during the Cold War. To address this issue, in January 1994, President Clinton established the Advisory Committee on Human Radiation Experiments (ACHRE), chaired by bioethicist Dr. Ruth Faden of Johns Hopkins University. The President also directed all Federal agencies to search for records related to human subjects radiation research and provide them to the Advisory Committee. This report presents the Administration`s actions to respond to the ACHRE`s findings and recommendations.

NONE

1997-03-01T23:59:59.000Z

397

Notice of Intent: Buildings University Innovators and Leaders...  

Broader source: Energy.gov (indexed) [DOE]

behalf of the Building Technologies Office, a Notice of Intent DE-FOA-0001191 concerning Funding Opportunity Announcement (FOA) DE-FOA-0001167 "Buildings University Innovators and...

398

Request for Information: High Impact Commercial Building Technology...  

Energy Savers [EERE]

U.S. Department of Energy's (DOE) Building Technologies Office (BTO) is developing a pipeline of high impact, cost-effective, energy saving and underutilized commercial building...

399

EERE FY 2016 Budget Overview -- Energy-Saving Homes, Buildings...  

Energy Savers [EERE]

Energy-Saving Homes, Buildings, and Manufacturing EERE FY 2016 Budget Overview -- Energy-Saving Homes, Buildings, and Manufacturing Office of Energy Efficiency and Renewable Energy...

400

Summary Report: Control Strategies for Mixed-Mode Buildings  

E-Print Network [OSTI]

the IECC building code and ASHRAE 90 have converged on an 8Office Buildings. ” ASHRAE Transactions. Vol. 90 (1B). 1984.

Brager, Gail; Borgeson, Sam; Lee, Yoonsu

2007-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Building Energy Codes Program Overview - 2014 BTO Peer Review...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of Energy This presentation at the 2014 Peer Review provided an overview of the Building Technologies Office's Building Energy Codes Program. Through robust feedback, the BTO...

402

The Research Building Blocks  

E-Print Network [OSTI]

The Research Building Blocks For Teaching Children to Read Third Edition Put Reading First Kindergarten Through Grade 3 Third Edition #12;#12;The Research Building Blocks for Teaching Children to Read Centers Program, PR/Award Number R305R70004, as administered by the Office of Educational Research

Rau, Don C.

403

BUILDING ENERGY 1987 Edition  

E-Print Network [OSTI]

BUILDING ENERGY EFFICIENCY STANDARDS 1987 Edition 1988 SUPPLEMENT December 1987 Supplement May 1988 at: http://www.energy.ca.gov/title24/ #12;California Energy Commission Charles R. Imbrecht, Chairman, Executive Director Energy Efficiency & Local Aaalatance Dlvlalon Building and Appliance Efficiency Office

404

Hudson Valley Clean Energy Office and Warehouse  

High Performance Buildings Database

Rhinebeck, NY Hudson Valley Clean Energy's new head office and warehouse building in Rhinebeck, New York, achieved proven net-zero energy status on July 2, 2008, upon completing its first full year of operation. The building consists of a lobby, meeting room, two offices, cubicles for eight office workers, an attic space for five additional office workers, ground- and mezzanine-level parts and material storage, and indoor parking for three contractor trucks.

405

A Retrofit Tool for Improving Energy Efficiency of Commercial Buildings  

E-Print Network [OSTI]

For Energy Efficiency of Public Building -- GB 50189.communication on building energy efficiency policy in China.Improving energy efficiency in existing buildings. ASHRAE

Levine, Mark

2014-01-01T23:59:59.000Z

406

Better Buildings Network View | April 2014 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

April 2014 More Documents & Publications Better Buildings Network View | December 2014 Better Buildings Residential Network Orientation Better Buildings Network View | November...

407

Better Buildings Network View | January 2015 | Department of...  

Broader source: Energy.gov (indexed) [DOE]

5 More Documents & Publications Better Buildings Network View | December 2014 Better Buildings Network View | November 2014 Better Buildings Residential Network Orientation...

408

Better Buildings Network View | November 2014 | Department of...  

Broader source: Energy.gov (indexed) [DOE]

November 2014 More Documents & Publications Better Buildings Network View | July-August 2014 Better Buildings Network View | December 2014 Better Buildings Network View | January...

409

Better Buildings Network View | February 2015 | Department of...  

Broader source: Energy.gov (indexed) [DOE]

5 More Documents & Publications Better Buildings Network View | November 2014 Better Buildings Network View | September 2014 Better Buildings Residential Network Case Study:...

410

University Buildings Landmark Buildings  

E-Print Network [OSTI]

KEY University Buildings Landmark Buildings The Lanyon Building Roads Footpath Cafe University Engineering N Medicine, Dentistry and Biomedical Sciences P Music and Sonic Arts Q Nursing and Midwifery R and Student Affairs 3 Administration Building 32 Ashby Building 27 Belfast City Hospital 28 Bernard Crossland

Paxton, Anthony T.

411

Building Distributed Energy Performance Optimization for China a Regional Analysis of Building Energy Costs and CO2 Emissions  

E-Print Network [OSTI]

Summer Study on Energy Efficiency in Buildings August 12,Standard for Energy Efficiency of Public Buildings. Energyfor Energy Efficiency of Residential Buildings in Hot Summer

Feng, Wei

2013-01-01T23:59:59.000Z

412

Vehicle Technologies Office: 2010 Advanced Combustion R&D Annual...  

Broader source: Energy.gov (indexed) [DOE]

10advcombustionengine.pdf More Documents & Publications Vehicle Technologies Office: 2009 Advanced Combustion R&D Annual Progress Report Vehicle Technologies Office: 2011...

413

Office leases & landlord investment in energy efficiency  

E-Print Network [OSTI]

What is the relationship between the structure of leases in the Boston office rental market and how much landlords invest in energy efficient building systems for their existing buildings? I am drawn to this question because ...

Meyer, Brian S. (Brian Stewart)

2008-01-01T23:59:59.000Z

414

Automatic flush valve performance (gallons per flush) measured from fixtures in a mixed-use classroom/office building at Texas A&M University  

E-Print Network [OSTI]

flush valve performance (gpf) of fixtures in a mixed use classroom building at Texas A&M University. Water consumption (gpf) among three types of fixtures; low-consumption manual, old optic automatic and improved optic automatic systems are measured...

Lertbannaphong, Salilla

2005-08-29T23:59:59.000Z

415

HVAC Design Strategy for a Hot-Humid Production Builder, Houston, Texas (Fact Sheet), Building America Case Study: Whole-House Solutions for New Homes, Building Technologies Office (BTO)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office0-72.pdfGeorge Waldmann GeorgeLogging Systems2008Gulf Coast'sFormHOWHQHVAC Design

416

Exterior Rigid Foam Insulation at the Edge of a Slab Foundation, Fresno, California (Fact Sheet), Building America Case Study: Efficient Solutions for New and Existing Homes, Building Technologies Office (BTO)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector General Office of Audit|Department of Energy56Executive212-2012 June 2012 DOEand

417

Building 32 35 Building 36  

E-Print Network [OSTI]

Building 10 Building 13 Building 7 LinHall Drive Lot R10 Lot R12 Lot 207 Lot 209 LotR9 Lot 205 Lot 203 LotBuilding30 Richland Avenue 39 44 Building 32 35 Building 36 34 Building 18 Building 19 11 12 45 29 15 Building 5 8 9 17 Building 16 6 Building 31 Building 2 Ridges Auditorium Building 24 Building 4

Botte, Gerardine G.

418

Fuel Cell Technologies Office: Publications  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAX POLICIES7.pdf Flash2010-57.pdfDepartment(Fact6:21EducationInformationAbout

419

Fuel Cell Technologies Office: Publications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation InInformation InExplosion Monitoring:Home| Visitors|Upcoming Events andWelcomeFIRST

420

Cost-Effective Energy Efficiency Measures for Above Code(ASHRAE 90.1-2001 and 2007) Small Office Buildings in the City of Arlington  

E-Print Network [OSTI]

Table 1. Base-Case Building Description Building Type Number of occupants = 73 Gross Area (sq. ft.) PNNL-19341 (Thornton et al. 2010) and CoA Aspect Ratio PNNL-19341 (Thornton et al. 2010) Square shape Number of Floors PNNL-19341 (Thornton et al.... 2010) Floor-to-Floor Height (ft.) ASHRAE 90.1-1989 13.7.1 Floor-to-Ceiling Height = 9 ft Orientation PNNL-19341 (Thornton et al. 2010) Wall Construction CoA Roof Configuration PNNL-19341 (Thornton et al. 2010) Foundation Construction PNNL-19341...

Kim, H.; Do, S.; Kim, K.H.; Baltazar, J.C.; Haberl, J.S.; Lewis, C.

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Transforming Commercial Building Operations | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

& Publications Retrocommissioning and the Public Sector retrocommissioningpublicsector.doc Small- and Medium-Size Building Automation and Control System Needs: Scoping Study...

422

Technology Transfer Office (TTO) Promote and facilitate the transfer of UC San Diego innovations for the benefit of the University community and the public.  

E-Print Network [OSTI]

Technology Transfer Office (TTO) MISSION Promote and facilitate the transfer of UC San Diego San Diego established its Technology Transfer Office (TTO) to promote and facilitate this process TECHNOLOGY TRANSFER RESULTS FY2000 ­ FY2007 Fiscal Year 2000 2001 2002 2003 2004 2005 2006 2007 Licenses 47

Fainman, Yeshaiahu

423

Buildings Performance Database Recommend Data Fields  

Broader source: Energy.gov [DOE]

Buildings Performance Database Recommend Data Fields, from the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

424

Commercial Building Demonstration and Deployment Overview - 2014...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Office's Commercial Building Demonstration and Deployment activities. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs....

425

City of Indianapolis- Green Building Incentive Program  

Broader source: Energy.gov [DOE]

The Indianapolis Office of Sustainability and the Department of Code Enforcement offer reduction in permit fees for projects achieving certain green building criteria. Property owners and...

426

Stud Walls With Continuous Exterior Insulation for Factory Built Housing: New York, New York (Fact Sheet), NREL (National Renewable Energy Laboratory), Building America Case Study Technology Solutions for New and Existing Homes, Building Technologies Office (BTO)  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of Inspector GeneralDepartment of Energyof theRestoration at Young - Rainey Jan. 24 /(Agreement

427

Green Building Standards for State Facilities  

Broader source: Energy.gov [DOE]

In November 2009, Rhode Island enacted legislation (S.B. 232) requiring that public building construction projects 5,000 square feet or larger and public building renovation projects 10,000 square...

428

VALIDATION OF THE eCALC COMMERCIAL CODE-COMPLIANT SIMULATION VERSUS MEASURED DATA FROM AN OFFICE BUILDING IN A HOT AND HUMID CLIMATE  

E-Print Network [OSTI]

for the case-study building were performed and reported in Cho and Haberl (2008). In this paper an extension of the previous work is presented using the eCALC commercial simulation model, which uses simplified geometry and ASHRAE Standard 90.1-compliant...

Cho, S.; Haberl, J.

429

FRASER POLLUTION ABATEMENT OFFICE  

E-Print Network [OSTI]

are to build partnerships, clean up pollution, and renew the productivity of the natural environment Environmental Protection Act and the pollution prevention provisions of the Fisheries Act. The pollution clean#12;FRASER POLLUTION ABATEMENT OFFICE PROGRESS REPORT 1994-95 Prepared By Maggie M. Paquet MAIA

430

Sustainable Building Design Revolving Loan Fund  

Broader source: Energy.gov [DOE]

The Sustainable Building Design Revolving Loan Fund (RLF) is funded by the American Recovery and Reinvestment Act of 2009 (ARRA). The Arkansas Energy Office granted the Arkansas Building Authority ...

431

Funding Opportunity Webinar - Building America | Department of...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

to 4:00PM EST Register for the webinar The Building Technologies Office (BTO)'s Residential Buildings Integration Program has announced the availability of up to 4 million in...

432

Energy Audit and Retro-Commissioning Policies for Public and...  

Broader source: Energy.gov (indexed) [DOE]

Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings...

433

Energy Audit and Retro-Commissioning Policies for Public and...  

Broader source: Energy.gov (indexed) [DOE]

Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings Energy Audit and Retro-Commissioning Policies for Public and Commercial Buildings U.S. Department...

434

City of Grand Rapids- Green Building Requirements for Municipal Buildings  

Broader source: Energy.gov [DOE]

In January 2006, the City of Grand Rapids approved a resolution detailing the city's sustainability policy for public buildings. The resolution directed city personnel to implement the principles...

435

Occupant satisfaction with indoor environmental quality in green buildings  

E-Print Network [OSTI]

non-green) LEED-rated / green buildings Office Layout Officebuildings, and LEED-rated/green buildings Figure 2 shows aMedian of LEED- rated/green buildings Percentile Rank

Abbaszadeh, S.; Zagreus, Leah; Lehrer, D.; Huizenga, C

2006-01-01T23:59:59.000Z

436

Lab begins demolition of Cold War-era buildings  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Demolition begins of cold War-Era buildings Lab begins demolition of Cold War-era buildings More than 165,000 square feet of former research, production, and office buildings will...

437

1995 building energy codes and standards workshops: Summary and documentation  

SciTech Connect (OSTI)

During the spring of 1995, Pacific Northwest National Laboratory (PNNL) conducted four two-day Regional Building Energy Codes and Standards workshops across the US. Workshops were held in Chicago, Denver, Rhode Island, and Atlanta. The workshops were designed to benefit state-level officials including staff of building code commissions, energy offices, public utility commissions, and others involved with adopting/updating, implementing, and enforcing building energy codes in their states. The workshops provided an opportunity for state and other officials to learn more about residential and commercial building energy codes and standards, the role of the US Department of Energy and the Building Standards and Guidelines Program at Pacific Northwest National Laboratory, Home Energy Rating Systems (HERS), Energy Efficient Mortgages (EEM), training issues, and other topics related to the development, adoption, implementation, and enforcement of building energy codes. Participants heard success stories, got tips on enforcement training, and received technical support materials. In addition to receiving information on the above topics, workshop participants had an opportunity to provide input on code adoption issues, building industry training issues, building design issues, and exemplary programs across the US. This paper documents the workshop planning, findings, and follow-up processes.

Sandahl, L.J.; Shankle, D.L.

1996-02-01T23:59:59.000Z

438

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

SciTech Connect (OSTI)

China's 11th Five-Year Plan (FYP) sets an ambitious target to reduce the energy intensity per unit of gross domestic product (GDP) by 20% from 2005 to 2010 (NDRC, 2006). In the building sector, the primary energy-saving target allocated during the 11 FYP period is 100 Mtce. Savings are expected to be achieved through the strengthening of enforcement of building energy efficiency codes, existing building retrofits and heat supply system reform, followed by energy management of government office buildings and large scale public buildings, adoption of renewable energy sources. To date, China has reported that it achieved the half of the 20% intensity reduction target by the end of 2008, however, little has been made clear on the status and the impact of the building programs. There has also been lack of description on methodology for calculating the savings and baseline definition, and no total savings that have been officially reported to date. This paper intend to provide both quantitative and qualitative assessment of the key policies and programs in building sector that China has instituted in its quest to fulfill the national goal. Overall, this paper concludes that the largest improvement for building energy efficiency were achieved in new buildings; the program to improve the energy management in government and large scale public buildings are in line with the target; however the progress in the area of existing building retrofit particularly heat supply system reform lags the stated goal by a large amount.

Zhou, Nan; McNeil, Michael; Levine, Mark

2010-06-07T23:59:59.000Z

439

Assessment of Building Energy-Saving Policies and Programs in China During the 11th Five Year Plan  

SciTech Connect (OSTI)

China's 11th Five-Year Plan (FYP) sets an ambitious target to reduce the energy intensity per unit of gross domestic product (GDP) by 20% from 2005 to 2010 (NDRC, 2006). In the building sector, the primary energy-saving target allocated during the 11 FYP period is 100 Mtce. Savings are expected to be achieved through the strengthening of enforcement of building energy efficiency codes, existing building retrofits and heat supply system reform, followed by energy management of government office buildings and large scale public buildings, adoption of renewable energy sources. To date, China has reported that it achieved the half of the 20% intensity reduction target by the end of 2008, however, little has been made clear on the status and the impact of the building programs. There has also been lack of description on methodology for calculating the savings and baseline definition, and no total savings that have been officially reported to date. This paper intends to provide both quantitative and qualitative assessment of the key policies and programs in building sector that China has instituted in its quest to fulfill the national goal. Overall, this paper concludes that the largest improvement for building energy efficiency were achieved in new buildings; the program to improve the energy management in government and large scale public buildings are in line with the target; however the progress in the area of existing building retrofits, particularly heating supply system reform lags behind the stated goal by a large amount.

Zhou, Nan; Mcneil, Michael; Levine, Mark

2011-03-01T23:59:59.000Z

440

Technology Solutions for New Manufactured Homes, Idaho, Oregon, and Washington Manufactured Home Builders (Fact Sheet), Building America Case Study: Whole-House Solutions for New Homes, Building Technologies Office (BTO)  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy StrainClientDesignOffice - 201420122 DOEServices »Technology

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

AUXILIARY RATE CALCULATION The Budget Office  

E-Print Network [OSTI]

AUXILIARY RATE CALCULATION The Budget Office #12;AGENDA Guiding Principles Rate Proposal Building Office supplies for budget manager reconciliationOffice supplies for budget manager reconciliation: Equipment Compensated Leave #12;CALCULATING A RATE Budgeted Expenses Budgeted Usage BaseBudgeted Usage Base

Weston, Ken

442

Energy Analysis and Energy Conservation Options for the Supreme Court and Attorney General Buildings Final Report, Prepared for the Energy Efficiency Division, Texas Public Utility Commission  

E-Print Network [OSTI]

loads, is solar film on the windows. Both the proposed ASHRAE standards and the California standards appear to reduce energy use. The following Table shows EUIs for the Supreme Court and Attorney General buildings with different options. EUI...'s For The Supreme Court and Attorney General Buildings (KBtu/sf-yr) ABSTRACT The energy use and peak load requirement of the Supreme Court & Attorney General Buildings in Austin, Texas were analyzed using the DOE 2.IB building energy simulation program. An analysis...

Farzad, M.; O'Neal, D. L.

1986-01-01T23:59:59.000Z

443

Public Interest Energy Research (PIER) Program FINAL PROJECT REPORT California Energy Balance Update and Decomposition Analysis for the Industry and Building Sectors  

E-Print Network [OSTI]

of which: CHP ele generation Residential Nonspecified (OtherOther Services (CHP heat Fuel use) Residential End Use (non-Residential Nonspecified (Other Sector) NEW Office (CHP heat

de la Rue du Can, Stephane

2014-01-01T23:59:59.000Z

444

Energy Performance Benchmarking and Disclosure Policies for Public...  

Broader source: Energy.gov (indexed) [DOE]

information on Energy Performance Benchmarking and Disclosure Policies for Public and Commercial Buildings Presentation Transcript More Documents & Publications...

445

Commercial & Institutional Green Building Performance  

E-Print Network [OSTI]

Buildings Voluntary Green Building Programs: • LEED www.usgbc.org • Living Building Challenge living-future.org/lbc • Green Globes www.greenglobes.com • WELL Buildings wellbuildinginstitute.com • ENERGY STAR energystar.gov ESL-KT-14...The North Central Branch Texas Public Works Association Commercial & Institutional Green Building Performance 11.19.2014 ESL-KT-14-11-26 CATEE 2014: Clean Air Through Efficiency Conference, Dallas, Texas Nov. 18-20 Q&A Your Presenters: Chris...

Harrison, S.; Mundell,C.; Meline, K.; Kraatz,J.

2014-01-01T23:59:59.000Z

446

Quantitative relationships between occupant satisfaction and satisfaction aspects of indoor environmental quality and building design  

E-Print Network [OSTI]

and thermal comfort in office buildings: Results of a largeIn: Proceedings of Healthy Buildings, Vol III, pp. 393-397.M. (2007) 'Green' buildings: What Australian building users

Frontczak, Monika; Schiavon, Stefano; Goins, John; Arens, Edward A; Zhang, Hui Ph.D; Wargocki, Pawel

2012-01-01T23:59:59.000Z

447

Public Order and Safety Buildings  

U.S. Energy Information Administration (EIA) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2007 10,998 9,933 10,998 10,643 10,998throughThousand CubicWashington Natural Gas Exports2. TypesOrder and

448

FOR OFFICERS REVISED AND PUBLISHED  

E-Print Network [OSTI]

Council 2007 Revision HANOVER, NEW HAMPSHIRE #12;To Dartmouth Club Officers: The development) 646-2253 Career Services (603) 646-2215 Club Mailings, Lists, Changes (603) 646-3497 Club Scholarships ............................................................................................................................ 8 Public Information Chair

Lotko, William

449

The Advantages of Highly Controlled Lighting for Offices and Commercial  

E-Print Network [OSTI]

LBNL-2514E The Advantages of Highly Controlled Lighting for Offices and Commercial Buildings F for Offices and Commercial Buildings Francis Rubinstein and Dmitriy Bolotov, Lawrence Berkeley National 25% of the electrical energy used in US commercial buildings (DOE 2007). Advanced lighting controls

450

Building an R package Division of Biostatistics  

E-Print Network [OSTI]

Building an R package Yen-Yi Ho Division of Biostatistics School of Public Health, University of Minnesota Yen-Yi Ho Building an R package #12;Steps Prepare your functions, example data sets Build package in man subdirectory) Write a package vignette Build and install the R package (R CMD build) Check the R

Carlin, Bradley P.

451

Unlocking energy efficiency in office districts : a stakeholder-based approach  

E-Print Network [OSTI]

Operational efficiency has remained elusive despite the potential for 10-20% savings from low and no cost measures in many office buildings. This is because office building energy performance is shaped by the actions of ...

Alschuler, Elena F. (Elena Fishman)

2012-01-01T23:59:59.000Z

452

Office of Document Reviews  

Broader source: Energy.gov [DOE]

The Office of Document Reviews ensures that all documents prepared at DOE Headquarters are properly marked to identify the level and category of protected information they contain (if any) and to ensure that all documents the Department prepares or is required to review under applicable statutes for public release contain no information requiring protection under law, regulations and Executive orders.

453

BETTER BUILDINGS ALLIANCE  

Office of Energy Efficiency and Renewable Energy (EERE)

Commercial buildings—our offices, schools, hospitals, restaurants, hotels and stores—consume nearly 20% of all energy used in the United States. We spend more than $200 billion each year to power our country's commercial buildings. Unfortunately, much of this energy and money is wasted; a typical commercial building could save 20% on its energy bills simply by commissioning existing systems so they operate as intended. Energy efficiency is a cost-effective way to save money, support job growth, reduce pollution, and improve competitiveness.

454

Building Stones  

E-Print Network [OSTI]

3). Photographs by the author. Building Stones, Harrell, UEEOxford Short Citation: Harrell, 2012, Building Stones. UEE.Harrell, James A. , 2012, Building Stones. In Willeke

2012-01-01T23:59:59.000Z

455

Campus Sustainability Office Campus Planning Office  

E-Print Network [OSTI]

Campus Sustainability Office (CSO) Campus Planning Office (CPO) Campus Sustainability Manager (Molly Bressers) Campus Sustainability Office and Campus Planning Office September 2014 Student Employee

Caughman, John

456

Demand Shifting with Thermal Mass in Large Commercial Buildings in a California Hot Climate Zone  

E-Print Network [OSTI]

implement demand-response programs involving buildingthan the building envelope in demand response effectiveness.demand response, thermal mass, hot climates, office buildings

Xu, Peng

2010-01-01T23:59:59.000Z

457

DMBC: Introductions ATLAS Building Facilities  

E-Print Network [OSTI]

DMBC: Introductions ATLAS Building Facilities 3rd Floor - Film Editing Bays (South Hallway://tam.colorado.edu/checkout.php · ATLAS Building: Main Office (Room 223) · Checkout times: M-F, 1:00pm - 4:00pm Redwood Server Access it running. o Once connected, you may log into the Redwood server from off campus. File Management ATLAS

Stowell, Michael

458

Los Alamos National Laboratory Building Cost Index  

SciTech Connect (OSTI)

The Los Alamos National Laboratory Building Cost Index indicates that actual escalation since 1970 is near 10% per year. Therefore, the Laboratory will continue using a 10% per year escalation rate for construction estimates through 1985 and a slightly lower rate of 8% per year from 1986 through 1990. The computerized program compares the different elements involved in the cost of a typical construction project, which for our purposes, is a complex of office buildings and experimental laboratores. The input data used in the program consist primarily of labor costs and material and equipment costs. The labor costs are the contractural rates of the crafts workers in the Los Alamos area. For the analysis, 12 field-labor draft categories are used; each is weighted corresponding to the labor craft distribution associated with the typical construction project. The materials costs are current Los Alamos prices. Additional information sources include material and equipment quotes obtained through conversations with vendors and from trade publications. The material and equipment items separate into 17 categories for the analysis and are weighted corresponding to the material and equipment distribution associated with the typical construction project. The building cost index is compared to other national building cost indexes.

Orr, H.D.; Lemon, G.D.

1983-01-01T23:59:59.000Z

459

Los Alamos National Laboratory building cost index  

SciTech Connect (OSTI)

The Los Alamos National Laboratory Building Cost Index indicates that actual escalation since 1970 is near 10% per year. Therefore, the Laboratory will continue using a 10% per year escalation rate for construction estimates through 1985 and a slightly lower rate of 8% per year from 1986 through 1990. The computerized program compares the different elements involved in the cost of a typical construction project, which for our purposes, is a complex of office buildings and experimental laboratories. The input data used in the program consist primarily of labor costs and material and equipment costs. The labor costs are the contractual rates of the crafts workers in the Los Alamos area. For the analysis, 12 field-labor craft categories are used; each is weighted corresponding to the labor craft distribution associated with the typical construction project. The materials costs are current Los Alamos prices. Additional information sources include material and equipment quotes obtained through conversations with vendors and from trade publications. The material and equipment items separate into 17 categories for the analysis and are weighted corresponding to the material and equipment distribution associated with the typical construction project. The building cost index is compared to other national building cost indexes.

Orr, H.D.; Lemon, G.D.

1982-10-01T23:59:59.000Z

460

4-H Club Officer Handbook - Reporter  

E-Print Network [OSTI]

This section from the 4-H Club Officer Handbook features the multi-faceted role of the Reporter/Public Relations Officer. Tips on covering the news and dealing with your local media are essential to the officer's success as the club's top news...

Howard, Jeff W.

2006-08-09T23:59:59.000Z

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

REPORT OF SURVEY OF OAK RIDGE BUILDING 3597 HOT STORAGE GARDEN  

Broader source: Energy.gov (indexed) [DOE]

BUILDING 3597 HOT STORAGE GARDEN U.S. Department of Energy Office of Environmental Management & Office of Science Report of Survey of Oak Ridge Building 3597 Hot Storage Garden...

462

Office | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy ResourcesLoading map...(UtilityCounty, Michigan: Energy Resources JumpBuildings used for general office

463

Green Building Certification Systems Requirement for New Federal...  

Energy Savers [EERE]

greenblgcert.docx More Documents & Publications EA-1991: Final Environmental Assessment Green Building Certification Systems Requirement for New Federal Buildings and Major...

464

DOE Commercial Reference Buildings Summary of Changes Between...  

Broader source: Energy.gov (indexed) [DOE]

Buildings refbldgschangesv40tov70.pdf More Documents & Publications DOE Commercial Reference Buildings Summary of Changes Between Versions Department of Energy Commercial...

465

4 Questions for a Better Buildings Case Competition Student Participan...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Case Competition supports the broader Better Buildings Initiative goal to reduce energy consumption in commercial, multifamily, public, and industrial buildings across the...

466

Green Building Certification Systems Requirement for New Federal...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

CFR Parts 433, 435 and 436. greenblgcertcompare2014.docx More Documents & Publications Green Building Certification Systems Requirement for New Federal Buildings and Major...

467

Building America Technology Solutions for New and Existing Homes...  

Broader source: Energy.gov (indexed) [DOE]

Systems, at two Chicago area multifamily buildings with existing OTR control. Advanced Boiler Load Monitoring Controllers More Documents & Publications Building America...

468

U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND...  

Office of Environmental Management (EM)

U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY 10 ENVIRONMENTAL ASSESSMENT PUBLIC SCOPING MEETING U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY...

469

An Energy and Peak Loads Analysis of the Texas Department of Health Building, Final Report, Prepared for the Energy Efficiency Division, Texas Public Utility Commission  

E-Print Network [OSTI]

points are from the specifications provided by the SPGSC. Each zone, described earlier, was assigned a separate two speed fan. 8 CHAPTER 4 RESULTS & ANALYSIS The energy consumption of the Health Building at Austin was ana- lyzed using the DOE 2.1B... conduction and glass solar loads. Finally, the energy consumption of the Health Building modified to conform the proposed California standards was also studied [3]. BASE BUILDING RESULTS Peak Cooling Loads Figure 4.1 shows the distribution of the peak cooling...

Katipamula, S.; O'Neal, D. L.

1986-01-01T23:59:59.000Z

470

High-performance commercial building systems  

SciTech Connect (OSTI)

This report summarizes key technical accomplishments resulting from the three year PIER-funded R&D program, ''High Performance Commercial Building Systems'' (HPCBS). The program targets the commercial building sector in California, an end-use sector that accounts for about one-third of all California electricity consumption and an even larger fraction of peak demand, at a cost of over $10B/year. Commercial buildings also have a major impact on occupant health, comfort and productivity. Building design and operations practices that influence energy use are deeply engrained in a fragmented, risk-averse industry that is slow to change. Although California's aggressive standards efforts have resulted in new buildings designed to use less energy than those constructed 20 years ago, the actual savings realized are still well below technical and economic potentials. The broad goal of this program is to develop and deploy a set of energy-saving technologies, strategies, and techniques, and improve processes for designing, commissioning, and operating commercial buildings, while improving health, comfort, and performance of occupants, all in a manner consistent with sound economic investment practices. Results are to be broadly applicable to the commercial sector for different building sizes and types, e.g. offices and schools, for different classes of ownership, both public and private, and for owner-occupied as well as speculative buildings. The program aims to facilitate significant electricity use savings in the California commercial sector by 2015, while assuring that these savings are affordable and promote high quality indoor environments. The five linked technical program elements contain 14 projects with 41 distinct R&D tasks. Collectively they form a comprehensive Research, Development, and Demonstration (RD&D) program with the potential to capture large savings in the commercial building sector, providing significant economic benefits to building owners and health and performance benefits to occupants. At the same time this program can strengthen the growing energy efficiency industry in California by providing new jobs and growth opportunities for companies providing the technology, systems, software, design, and building services to the commercial sector. The broad objectives across all five program elements were: (1) To develop and deploy an integrated set of tools and techniques to support the design and operation of energy-efficient commercial buildings; (2) To develop open software specifications for a building data model that will support the interoperability of these tools throughout the building life-cycle; (3) To create new technology options (hardware and controls) for substantially reducing controllable lighting, envelope, and cooling loads in buildings; (4) To create and implement a new generation of diagnostic techniques so that commissioning and efficient building operations can be accomplished reliably and cost effectively and provide sustained energy savings; (5) To enhance the health, comfort and performance of building occupants. (6) To provide the information technology infrastructure for owners to minimize their energy costs and manage their energy information in a manner that creates added value for their buildings as the commercial sector transitions to an era of deregulated utility markets, distributed generation, and changing business practices. Our ultimate goal is for our R&D effort to have measurable market impact. This requires that the research tasks be carried out with a variety of connections to key market actors or trends so that they are recognized as relevant and useful and can be adopted by expected users. While some of this activity is directly integrated into our research tasks, the handoff from ''market-connected R&D'' to ''field deployment'' is still an art as well as a science and in many areas requires resources and a timeframe well beyond the scope of this PIER research program. The TAGs, PAC and other industry partners have assisted directly in this effort

Selkowitz, Stephen

2003-10-01T23:59:59.000Z

471

Occupancy-Based Energy Management in Buildings: Final Report to Sponsors  

E-Print Network [OSTI]

Energy Efficient Economy. Emmerich, S.J. and Persily, A.K. ,typical office building (Emmerich and Persily 2001). Figure

Sohn, Michael D.

2010-01-01T23:59:59.000Z

472

FORESTRY BUILDING: BUILDING EMERGENCY PLAN  

E-Print Network [OSTI]

FORESTRY BUILDING: BUILDING EMERGENCY PLAN Date Adopted: August 18, 2009 Date Revised June 17, 2013 Prepared By: Diana Evans and Jennifer Meyer #12;PURDUE UNIVERSITY BUILDING EMERGENCY PLAN VERSION 3 2 Table Suspension or Campus Closure SECTION 3: BUILDING INFORMATION 3.1 Building Deputy/Alternate Building Deputy

473

Skills and Occupational Needs in Green Building  

E-Print Network [OSTI]

European Union Skills and Occupational Needs in Green Building 2011 Jobs Jobs Transition Just Department #12;Skills and Occupational Needs in Green Building 2011 #12;#12;InternatIonal labour offIce · Geneva european commIssIon Skills and Occupational Needs in Green Building 2011 #12;photocomposed

474

Energy 101: Energy Efficient Commercial Buildings  

ScienceCinema (OSTI)

Learn how commercial buildings can incorporate whole-building design to save energy and money while enhancing performance and comfort. This video highlights several energy-saving features of the Research Support Facility at the Energy Department's National Renewable Energy Laboratory-a model for high-performance office building design.

None

2014-06-26T23:59:59.000Z

475

Phillip Burton Federal Building EMCS Retrofit Analysis  

E-Print Network [OSTI]

and Renewable Energy, Office of Building Technology and Community Systems, and the Federal Energy ManagementPhillip Burton Federal Building EMCS Retrofit Analysis Interim Report March 1999 Rick Diamond, Tim This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San

Diamond, Richard

476

BEHAVIORAL SCIENCES BUILDING ADDITION March 30, 2012  

E-Print Network [OSTI]

BEHAVIORAL SCIENCES BUILDING ADDITION March 30, 2012 EXECUTIVE SUMMARY: The current concept. The addition is proposed to be constructed on the east side of the existing building. The auditorium is based on building and finishing the auditorium and main level offices. The upper and basement levels

477

Energy 101: Energy Efficient Commercial Buildings  

SciTech Connect (OSTI)

Learn how commercial buildings can incorporate whole-building design to save energy and money while enhancing performance and comfort. This video highlights several energy-saving features of the Research Support Facility at the Energy Department's National Renewable Energy Laboratory-a model for high-performance office building design.

None

2014-03-14T23:59:59.000Z

478

SCHOLARLY PUBLICATIONS SCHOLARLY PUBLICATIONS  

E-Print Network [OSTI]

2013 SCHOLARLY PUBLICATIONS #12;#12;SCHOLARLY PUBLICATIONS 2013 #12;Editor: Mark Hayman Academic ..................................................................... Journal articles

479

BUILDING NAME HEYDON-LAURENCE BUILDING  

E-Print Network [OSTI]

BUILDING NAME HEYDON-LAURENCE BUILDING PHARMACY AND BANK BUILDING JOHN WOOLEY BUILDING OLD TEARCHER'S BUILDING PHYSICS BUILDING BAXTER'S LODGE INSTITUTE BUILDING CONSERVATION WORKS R.D.WATT BUILDING MACLEAY BUILDING THE QUARANGLE BADHAM BUILDING J.D. STEWART BUILDING BLACKBURN BUILDING MADSEN BUILDING STORE

Viglas, Anastasios

480

Office Lighting: Title 24 & Technology Update  

E-Print Network [OSTI]

Office Lighting: Title 24 & Technology Update Kelly Cunningham Outreach Director kcunning@ucdavis.edu California Lighting Technology Center, UC Davis RESEARCH . INNOVATION . PARTNERSHIP Supporting compliance apply the Title 24 Building Energy Efficiency Standards code requirements specific to lighting

California at Davis, University of

Note: This page contains sample records for the topic "office public building" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Review of the Coal and Electric Sections in the Monthly Energy Review and an Overall Review of Office of Energy Data Operations Publications  

SciTech Connect (OSTI)

This Review of the Coal and Electric Sections of the Monthly Energy Review and an Overall Review of OEDO Publications is comprised of two sections. The first, Review of Coal and Electric Power Data in the Monthly Energy Review consists of a detailed analysis of content and data presentation issues. The major findings of this section are summarized below: the coal and electric power data in the Monthly Energy Review (MER) represent the major functions of the respective industries; coal data by rank are inconsistently presented in the MER; coal value or coal cost and quality data are not adequately represented in the MER; the presentation of two or more units of measurement on the same table in MER may invite incorrect comparisons unless properly separated (e.g., - double line separation); to improve the timeliness of the data in the MER, the increased use of estimated, preliminary, and/or projected data should be considered; and the table and graphic formats used in the MER present the data clearly and concisely. The second section of the report, An Overall Review of OEDO Publications, contains the results of an analysis of data presentation in forty-six coal, gas, electric, oil and consolidated publications. A summary of our findings and recommendations is listed below: where practical, a scope of publication section and executive summary should be included in OEDO publications; table formats, including titles and endnotes should be uniform; more detailed guidelines for titling should be established by the Energy Information Administration (EIA); and a more detailed set of standards for footnotes, notes and source notes should be established by EIA.

Not Available

1981-04-01T23:59:59.000Z

482

City of Cleveland- Residential Property Tax Abatement for Green Buildings  

Broader source: Energy.gov [DOE]

The City of Cleveland, in cooperation with the Cuyahoga County Auditor's Office, provides a 100% tax abatement for residential properties built to the Cleveland Green Building Standard. Tax...

483

Small Buildings and Small Portfolios Overview - 2014 BTO Peer...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Technologies Office's Small Buildings and Small Portfolios activities. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs....

484

Energy-Saving Homes, Buildings, & Manufacturing (Fact Sheet)  

SciTech Connect (OSTI)

This document highlights DOE's Office of Energy Efficiency and Renewable Energy's advancements in saving energy in homes, buildings, and industrial plants.

Not Available

2012-09-01T23:59:59.000Z

485

Characterization of commercial building appliances. Final report  

SciTech Connect (OSTI)

This study focuses on ``other`` end-uses category. The purpose of this study was to determine the relative importance of energy end-use functions other than HVAC and lighting for commercial buildings, and to identify general avenues and approaches for energy use reduction. Specific energy consuming technologies addressed include non-HVAC and lighting technologies in commercial buildings with significant energy use to warrant detailed analyses. The end-uses include office equipment, refrigeration, water heating, cooking, vending machines, water coolers, laundry equipment and electronics other than office equipment. The building types include offices, retail, restaurants, schools, hospitals, hotels/motels, grocery stores, and warehouses.

Patel, R.F.; Teagan, P.W.; Dieckmann, J.T.

1993-08-01T23:59:59.000Z

486

Building Environmental Sustainability Bowling Green State University  

E-Print Network [OSTI]

Building Environmental Sustainability at Bowling Green State University Executive Summary Bud Folkins to offer recommendations for building an environmentally sustainable community at Bowling Green Services September 2002 #12;ii Introduction Bowling Green State University can become the premier public

Moore, Paul A.

487

Around Buildings  

E-Print Network [OSTI]

Around Buildings W h y startw i t h buildings and w o r k o u t wa r d ? For one, buildings are difficult t o a v o i d these

Treib, Marc

1987-01-01T23:59:59.000Z

488

Commercial Buildings Partnerships - Overview of Higher Education Projects  

SciTech Connect (OSTI)

The Commercial Building Partnership (CBP), a public/private, cost-shared program sponsored by the U.S. Department of Energy (DOE), paired selected commercial building owners and operators with representatives of DOE, its national laboratories, and private-sector technical experts. These teams explored energy-saving measures across building systems – including some considered too costly or technologically challenging – and used advanced energy modeling to achieve peak whole-building performance. Modeling results were then included in new construction or retrofit designs to achieve significant energy reductions. CBP design goals aimed to achieve 50 percent energy savings compared to ANSI/ASHRAE/IES Standard 90.1-2004 for new construction, while retrofits are designed to consume at least 30 percent less energy than either Standard 90.1-2004 or current consumption. After construction and commissioning of the project, laboratory staff continued to work with partners to collect and analyze data for verification of the actual energy reduction. CBP projects represent diverse building types in commercial real estate, including lodging, grocery, retail, higher education, office, and warehouse/storage facilities. Partners also commit to replicating low-energy technologies and strategies from their CBP projects throughout their building portfolios. As a result of CBP projects, five sector overviews (Lodging, Food Sales, General Merchandise, Higher Education, Offices) were created to capture successful strategies and recommended energy efficiency measures that could broadly be applied across these sectors. These overviews are supplemented with individual case studies providing specific details on the decision criteria, modeling results, and lessons learned on specific projects. Sector overviews and CBP case studies will also be updated to reflect verified data and replication strategies as they become available.

Parrish, Kristen; Robinson, Alastair; Regnier, Cindy

2013-02-01T23:59:59.000Z

489

DOE NEPA Compliance Officers  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

NEPA Compliance Officers NEPA Compliance Officers are listed first for Program Offices, then Power Marketing Administrations, then Field Offices. Please send updates to...

490

BUILDING INSPECTION Building, Infrastructure, Transportation  

E-Print Network [OSTI]

BUILDING INSPECTION Building, Infrastructure, Transportation City of Redwood City 1017 Middlefield Sacramento, Ca 95814-5514 Re: Green Building Ordinance and the Building Energy Efficiency Standards Per of Redwood City enforce the current Title 24 Building Energy Efficiency Standards as part

491

Tribal Renewable Energy Foundational Course: Direct Use for Building...  

Broader source: Energy.gov (indexed) [DOE]

Direct Use for Building Heat and Hot Water Tribal Renewable Energy Foundational Course: Direct Use for Building Heat and Hot Water Watch the U.S. Department of Energy Office of...

492

Office of Facilities Planning and Management  

E-Print Network [OSTI]

Office of Facilities Planning and Management Building Best Practices Through Energy Efficiency;Office of Facilities Planning and Management Recycling Plastics All Bottles and Cans Plastic Metal Glass All #1 and #2 Plastics Eg. Some salad containers NO Styrofoam Lab glass (including test tubes

Ford, James

493

California Energy Commission's Public Interest Energy Research Program Case Study PIER Buildings Program Research Powers the Future www.energy.ca.gov/research  

E-Print Network [OSTI]

. The technology is installed by shutting off the fan, blocking all inlets and outlets, pressurizing the system to nucleate on edges and build a seal to block flow. Features and Benefits · Allows reduction of fan flow and joints of ductwork, but be prepared to address initially undiscovered design flaws or major ductwork

California at Davis, University of

494

Building America Whole-House Solutions for Existing Homes: Evaluation...  

Energy Savers [EERE]

Ordinance. Evaluation of a Multifamily Retrofit in Climate Zone 5 - Boulder, Colorado More Documents & Publications Building America Expert Meeting: Retrofit...

495

air force office: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Does not include Office of Health Sciences and College Howat, Ian M. 91 Proposal for an Adsorption Solar-Driven Air-Conditioning Unit for Public Offices Texas A&M University -...

496

air force officer: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Does not include Office of Health Sciences and College Howat, Ian M. 91 Proposal for an Adsorption Solar-Driven Air-Conditioning Unit for Public Offices Texas A&M University -...

497

Jackson Park Hospital Green Building Medical Center  

SciTech Connect (OSTI)

Jackson Park Hospital completed the construction of a new Medical Office Building on its campus this spring. The new building construction has adopted the City of Chicago�s recent focus on protecting the environment, and conserving energy and resources, with the introduction of green building codes. Located in a poor, inner city neighborhood on the South side of Chicago, Jackson Park Hospital has chosen green building strategies to help make the area a better place to live and work.

William Dorsey; Nelson Vasquez

2010-03-01T23:59:59.000Z

498

Window-Related Energy Consumption in the US Residential and Commercial Building Stock  

E-Print Network [OSTI]

Efficiency and Renewable Energy, Building Technologies, U.S.and Renewable Energy (2005). 2005 Buildings Energy Databook,Buildings Energy Databook Table 1.2.3 (US DOE Office of Energy Efficiency and Renewable

Apte, Joshua; Arasteh, Dariush

2008-01-01T23:59:59.000Z

499

Human comfort and self-estimated performance in relation to indoor environmental parameters and building features  

E-Print Network [OSTI]

quality (IEQ) acceptance in residential buildings, Energyand Building, 41, 930- Lai, J.H.K. and Yik, F.W.H. (2007)of workers in office buildings: the European HOPE project,

Frontczak, Monika

2012-01-01T23:59:59.000Z

500

Buildings | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating SolarElectricEnergyCTBarre BiomassTHISBrickyardRepower JumpBuildingChangeprovide