  1. Ocala Utility Services- Energy Efficiency Rebate Program

    Broader source: Energy.gov [DOE]

    Ocala Utility Services Electric and Telecommunications is a community owned utility that serves around 50,000 customers in Ocala and Marion County area. Ocala Utility Services offers rebates on A/C...

  2. Ocala Utility Services- Solar Hot Water Heating Rebate Program

    Broader source: Energy.gov [DOE]

    The Solar Water Heater Rebate Program is offered to residential retail electric customers by the City of Ocala Utility Services. Interested customers must complete an application and receive...

  3. O Oc

    Energy Savers [EERE]

    ... 2011 identified operational problems that could adversely impact ... Needed in the Department's Emergency Preparedness and Continuity of Operations Planning, (DOEIG-0845, January ...

  4. 2OC | Open Energy Information

    Open Energy Info (EERE)

    OC Jump to: navigation, search Name: 2OC Place: Bath, England, United Kingdom Zip: BA1 7AB Product: Bath-based, geo-pressure energy company. 2OC helps organisations in the UK and...

  5. OCS National Compendium

    SciTech Connect (OSTI)

    Gould, G.J.; Karpas, R.M.; Slitor, D.L.

    1991-06-01

    The Minerals Management Service's (MMS) Outer Continental Shelf Information Program (OCSIP) is responsible for making available to affected coastal States, local governments, and other interested parties data and information related to the Outer Continental Shelf (OCS) Oil and Gas Program. Since its establishment through Section 26 of the OCS Lands Act (OCSLA) Amendments of 1978, OCSIP has prepared regional summary reports, updates, and indexes on leasing, exploration, development, and production activities to fulfill the mandates of the OCSLA Amendments. The OCSIP receives many requests for out-of-print summary reports, updates, and indexes. The purpose of the OCS National Compendium is to consolidate these historical data and to present the data on an OCS-wide and regional scale. The single-volume approach allows the reader access to historical information and facilitates regional comparisons. The fold-out chart in the front of this publication provides the reader with a timeline (January 1988--November 1990) of events since publication of the last Compendium. Some of the events are directly related to the 5-year Oil and Gas Program, whereas others may or may not have an effect on the program. A predominantly graphic format is used in the report so that the large accumulation of data can be more readily comprehended. In some cases, it is not possible to update information through October 21, 1990, because of the nature of the data. For example, production data normally lags 3 months. 58 figs., 37 tabs.

  6. Operational experience of the OC-OTEC experiments at NELH

    SciTech Connect (OSTI)

    Link, H.

    1989-02-01

    The Solar Energy Research Institute, under funding and program direction from the US Department of Energy, has been operating a small-scale test apparatus to investigate key components of open- cycle ocean thermal energy conversion (OC-OTEC). The apparatus started operations in October 1987 and continues to provide valuable information on heat-and mass-transfer processes in evaporators and condensers, gas sorption processes as seawater is depressurized and repressurized, and control and instrumentation characteristics of open-cycle systems. Although other test facilities have been used to study some of these interactions, this is the largest apparatus of its kind to use seawater since Georges Claude's efforts in 1926. The information obtained from experiments conducted in this apparatus is being used to design a larger scale experiment in which a positive net power production is expected to be demonstrated for the first time with OC-OTEC. This paper describes the apparatus, the major tests conducted during its first 18 months of operation, and the experience gained in OC-OTEC system operation. 13 refs., 8 figs.

  7. Operational experience of the OC-OTEC experiments at NELH

    SciTech Connect (OSTI)

    Link, H.

    1989-02-01

    The Solar Energy Research Institute, under funding and program direction from the US Department of Energy, has been operating a small-scale test apparatus to investigate key components of open- cycle ocean thermal energy conversion (OC-OTEC). The apparatus started operations in October 1987 and continues to provide valuable information on heat-and mass-transfer processes in evaporators and condensers, gas sorption processes as seawater is depressurized and repressurized, and control and instrumentation characteristics of open-cycle systems. Although other test facilities have been used to study some of these interactions, this is the largest apparatus of its kind to use seawater since Georges Claude`s efforts in 1926. The information obtained from experiments conducted in this apparatus is being used to design a larger scale experiment in which a positive net power production is expected to be demonstrated for the first time with OC-OTEC. This paper describes the apparatus, the major tests conducted during its first 18 months of operation, and the experience gained in OC-OTEC system operation. 13 refs., 8 figs.

  8. Ultraviolet photodissociation of OCS: Product energy and angular distributions

    SciTech Connect (OSTI)

    McBane, G. C. [Department of Chemistry, Grand Valley State University, Allendale, Michigan 49401 (United States); Schmidt, J. A.; Johnson, M. S. [Department of Chemistry, University of Copenhagen, Universitetsparken 5, DK-2100 Copenhagen O (Denmark); Schinke, R. [Max-Planck-Institut fuer Dynamik und Selbstorganisation (MPIDS), D-37077 Goettingen (Germany)

    2013-03-07

    The ultraviolet photodissociation of carbonyl sulfide (OCS) was studied using three-dimensional potential energy surfaces and both quantum mechanical dynamics calculations and classical trajectory calculations including surface hopping. The transition dipole moment functions used in an earlier study [J. A. Schmidt, M. S. Johnson, G. C. McBane, and R. Schinke, J. Chem. Phys. 137, 054313 (2012)] were improved with more extensive treatment of excited electronic states. The new functions indicate a much larger contribution from the 1 {sup 1}A{sup Double-Prime} state ({sup 1}{Sigma}{sup -} in linear OCS) than was found in the previous work. The new transition dipole functions yield absorption spectra that agree with experimental data just as well as the earlier ones. The previously reported potential energy surfaces were also empirically modified in the region far from linearity. The resulting product state distributions P{sub v,j}, angular anisotropy parameters {beta}(j), and carbon monoxide rotational alignment parameters A{sub 0}{sup (2)}(j) agree reasonably well with the experimental results, while those computed from the earlier transition dipole and potential energy functions do not. The higher-j peak in the bimodal rotational distribution is shown to arise from nonadiabatic transitions from state 2 {sup 1}A{sup Prime} to the OCS ground state late in the dissociation.

  9. File:BOEMRE OCS.oil.gas.2007-12.map.pdf | Open Energy Information

    Open Energy Info (EERE)

    OCS.oil.gas.2007-12.map.pdf Jump to: navigation, search File File history File usage Outer Continental Shelf (OCS) Oil & Gas Leasing Program 2007 - 2012 Size of this preview: 700...

  10. HNF-SD-WM-TI-740, Rev. OC

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    84047 HNF-SD-WM-TI-740, Rev. OC Standard Inventories of Chemicals and Radionuclides in Hanford Site Tank Wastes M. J. Kupfer, A. L. Boldt, K. N. Hodgson, L. W. Shelton, B. C. Simpson, and R. A. Watrous (LMHC); M. D. LeClair (SAIC); G. 1. Borsheim (BA); R. T. Winward (MA); B. A. Higley and R. M. Orme (NHC); N. G. Colton (PNNL); S. L. Lambert and D. E. Place (Cogema); and W. W. Schulz (112S) Lockheed Martin Hanford Corporation, Richland, WA 99352 U.S. Department of Energy Contract

  11. BLM - Instruction Memorandum No. OC-2012-005 | Open Energy Information

    Open Energy Info (EERE)

    BLM - Instruction Memorandum No. OC-2012-005 Abstract This instruction memorandum sets forth procedures and requirements for conducting the FY 2012 Real Property inventory and...

  12. Definition of the Floating System for Phase IV of OC3

    SciTech Connect (OSTI)

    Jonkman, J.

    2010-05-01

    Phase IV of the IEA Annex XXIII Offshore Code Comparison Collaboration (OC3) involves the modeling of an offshore floating wind turbine. This report documents the specifications of the floating system, which are needed by the OC3 participants for building aero-hydro-servo-elastic models.

  13. Definition of the Semisubmersible Floating System for Phase II of OC4

    SciTech Connect (OSTI)

    Robertson, A.; Jonkman, J.; Masciola, M.; Song, H.; Goupee, A.; Coulling, A.; Luan, C.

    2014-09-01

    Phase II of the Offshore Code Comparison Collaboration Continuation (OC4) project involved modeling of a semisubmersible floating offshore wind system as shown below. This report documents the specifications of the floating system, which were needed by the OC4 participants for building aero-hydro-servo-elastic models.

  14. Thermoeconomic optimization of OC-OTEC electricity and water production plants

    SciTech Connect (OSTI)

    Block, D.L.; Valenzuela, J.A.

    1985-05-01

    The study on the thermoeconomic evaluation of open-cycle ocean thermal energy conversion (OC-OTEC) objectives were to assess the economic and technical viability of OC-OTEC for the production of electricity and fresh water based on the current state-of-the-art; develop conceptual designs of optimized OC-OTEC plants that produce electricity and fresh water for plant sizes that are economically attractive; and identify the research issues that must be resolved before a commercial plant can be built. Oceanographic data for six potential sites were evaluated and ''generic'' site characteristics were developed. Current and projected prices and requirements for electricity and water at potential sites were obtained. The state-of-the-art of components comprising the OC-OTEC plant was reviewed. The highest performing, least costly, and least technically uncertain design for each component was selected. Component cost and performance models were then developed and integrated into thermoeconomic system models for single- and double-stage OC-OTEC plants that produced electricity and fresh water. A computerized optimization procedure was developed to obtain optimal plant configurations for the production of electricity and fresh water. Small-scale OC-OTEC appears economically and technologically feasible for many potential sites. OC-OTEC may represent a technology with tremendous near-term potential. It is recommended that it be aggressively pursued.

  15. Design and cost study of critical OC-OTEC plant components: Final subcontract report

    SciTech Connect (OSTI)

    Valenzuela, J.A.; Jasinski, T.; Stacey, W.D.; Patel, B.R.; Dolan, F.Y.

    1988-06-01

    During the FY 1983-84, system analysis studies were performed by the Florida Solar Energy Center and Creare Inc. to assess the economic and technological viability of the OC-OTEC concept for producing both electricity and fresh water on a small scale. A major conclusion of the study was that land-based OC-OTEC plants as small as 10 MWe may be economically feasible in island communities if cost credits are taken for the fresh water produced. The present study builds upon and extends the results of that work. Assess the effect of the seasonal variation in the ocean surface water temperature on the performance of OC-OTEC plants; evaluate the technical feasibility of building small scale OC-OTEC plants using existing low pressure steam turbine rotor designs; refine the plant structure model developed during the Phase I study; and develop background information and analyses to evaluate the various alternative strategies for handling noncondensible gases in OC-OTEC plants. Refinements in OC-OTEC plant performance and cost models performed during the present study have reduced the estimated cost of a 10 MW baseline plant from 99 to 72M$. Further cost reduction of 5 to 10M$ is anticipated from the revised structure cost model and the implementation of barometric leg deaeration and hydraulic compression. Therefore, the results from this study reinforce the earlier conclusion that small-scale OC-OTEC plants are competitive at present for the production of electricity and fresh water in the Caribbean and Pacific Islands. OC-OTEC represents a technology with significant potential. We recommend that it be aggressively pursued. 33 refs., 67 figs., 20 tabs.

  16. Analysis of the premitting processes associated with exploration of Federal OCS leases. Final report

    SciTech Connect (OSTI)

    Not Available

    1980-11-01

    Under contract to the Office of Leasing Policy Development (LPDO), Jack Faucett Associates is currently undertaking the description and analysis of the Outer Continental Shelf (OCS) regulatory process to determine the nature of time delays that affect OCS production of oil and gas. This report represents the results of the first phase of research under this contract, the description and analysis of regulatory activity associated with exploration activities on the Federal OCS. Volume 1 contains the following three sections: (1) study results; (2) Federal regulatory activities during exploration of Federal OCS leases which involved the US Geological Survey, Environmental Protection Agency, US Coast Guard, Corps of Engineers, and National Ocean and Atmospheric Administration; and (3) state regulatory activities during exploration of Federal OCS leases of Alaska, California, Louisiana, Massachusetts, New Jersey, North Carolina, and Texas. Volume II contains appendices of US Geological Survey, Environmental Protection Agency, Coast Guard, Corps of Engineers, the Coastal Zone Management Act, and Alaska. The major causes of delay in the regulatory process governing exploration was summarized in four broad categories: (1) the long and tedious process associated with the Environmental Protection Agency's implementation of the National Pollutant Discharge Elimination System Permit; (2) the lack of mandated time periods for the completion of individual activities in the permitting process; (3) the lack of overall coordination of OCS exploratory regulation; and (4) the inexperience of states, the Federal government and industry relating to the appropriate level of regulation for first-time lease sale areas.

  17. Interaction between BaCO{sub 3} and OPC/BFS composite cements at 20 {sup o}C and 60 {sup o}C

    SciTech Connect (OSTI)

    Utton, C.A.; Gallucci, E.; Hill, J.; Milestone, N.B.

    2011-03-15

    A BaCO{sub 3} slurry, containing radioactive {sup 14}C, is produced during the reprocessing of spent nuclear fuel. This slurry is encapsulated in a Portland-blastfurnace slag composite cement. The effect of BaCO{sub 3} on the hydration of OPC and Portland-blastfurnace slag cements has been studied in this work. Samples containing a simulant BaCO{sub 3} slurry were cured for up to 720 days at 20 and 60 {sup o}C and analysed by XRD, SEM(EDX) and ICC. BaCO{sub 3} reacted with OPC to precipitate BaSO{sub 4} from a reaction between soluble sulfate and BaCO{sub 3}. Calcium monocarboaluminate subsequently formed from the carbonate released. The monocarboaluminate precipitated as crystals in voids formed during hydration. At 60 {sup o}C in OPC, it was not identified by XRD, suggesting the phase is unstable in this system around this temperature. In the Portland-blastfurnace slag cements containing BaCO{sub 3}, less monocarboaluminate and BaSO{sub 4} were formed, but the hydration of BFS was promoted and monocarboaluminate was stable up to 60 {sup o}C.

  18. OC3 -- Benchmark Exercise of Aero-Elastic Offshore Wind Turbine Codes: Preprint

    SciTech Connect (OSTI)

    Passon, P.; Kuhn, M.; Butterfield, S.; Jonkman, J.; Camp, T.; Larsen, T. J.

    2007-08-01

    This paper introduces the work content and status of the first international investigation and verification of aero-elastic codes for offshore wind turbines as performed by the "Offshore Code Comparison Collaboration" (OC3) within the "IEA Wind Annex XXIII -- Subtask 2".

  19. Quantum yield for carbon monoxide production in the 248 nm photodissociation of carbonyl sulfide (OCS)

    SciTech Connect (OSTI)

    Zhao, Z.; Stickel, R.E.; Wine, P.H. [Georgia Institute of Technology, Atlanta, GA (United States)] [Georgia Institute of Technology, Atlanta, GA (United States)

    1995-03-01

    Tunable diode laser absorption spectroscopy has been coupled with excimer laser flash photolysis to measure the quantum yield for CO production from 248 nm photodissociation of carbonyl sulfide (OCS) relative to the well known quantum yield for CO production from 248 nm photolysis of phosgene (Cl{sub 2}CO). The temporal resolution of the experiments was sufficient to distinguish CO formed directly by photodissociation from that formed by subsequent S({sup 3}P{sub j}) reaction with OCS. Under the experimental conditions employed, CO formation via the fast S({sup 1}D{sub 2})+OCS reaction was minimal. Measurements at 297K and total pressures from 4 to 100 Torr N{sub 2}+N{sub 2}O show the CO yield to be greater than 0.95 and most likely unity. This result suggests that the contribution of OCS as a precursor to the lower stratospheric sulfate aerosol layer is somewhat larger than previously thought. 25 refs., 1 fig., 2 tabs.

  20. Energy Planning

    Broader source: Energy.gov (indexed) [DOE]

    Energy Planning Agenda * What is energy planning? * The process * The plan * Strategic Energy Planning (SEP) Workbook * Other resources 2 What is Energy Planning? * Brings desired ...

  1. OC5 Project Phase I: Validation of Hydrodynamic Loading on a Fixed Cylinder: Preprint

    SciTech Connect (OSTI)

    Robertson, A. N.; Wendt, F. F.; Jonkman, J. M.; Popko, W.; Vorpahl, F.; Stansberg, C. T.; Bachynski, E. E.; Bayati, I.; Beyer, F.; de Vaal, J. B.; Harries, R.; Yamaguchi, A.; Shin, H.; Kim, B.; van der Zee, T.; Bozonnet, P.; Aguilo, B.; Bergua, R.; Qvist, J.; Qijun, W.; Chen, X.; Guerinel, M.; Tu, Y.; Yutong, H.; Li, R.; Bouy, L.

    2015-04-23

    This paper describes work performed during the first half of Phase I of the Offshore Code Comparison Collaboration Continuation, with Correlation project (OC5). OC5 is a project run under the IEA Wind Research Task 30, and is focused on validating the tools used for modeling offshore wind systems. In this first phase, simulated responses from a variety of offshore wind modeling tools were modeling tools were validated against tank test data of a fixed, suspended cylinder (without a wind turbine) that was tested under regular and irregular wave conditions at MARINTEK. The results from this phase include an examination of different approaches one can use for defining and calibrating hydrodynamic coefficients for a model, and the importance of higher-order wave models in accurately modeling the hydrodynamic loads on offshore substructures.

  2. Thermoeconomic optimizarion of OC-OTEC electricity and water production plants. Final report

    SciTech Connect (OSTI)

    Block, D.L.; Girgis, M.A.; Huggins, J.C.; McCluney, R.; Rotundo, L.; Valenzuela, J.A.; Hutchings, B.J.; Stacy, W.D.; Sam, R.G.; Patel, B.R.

    1984-09-01

    The objectives of this yearlong project were to: (1) assess the economic and technical viability of open-cycle ocean thermal energy conversion of (OC-OTEC) for the production of electricity and/or fresh water based on the current state of the art; (2) develop conceptual designs of optimized OC-OTEC plants that produce electricity and/or fresh water for plant sizes that are economically attractive; and (3) identify the research issues that must be resolved before a commercial plant can be built. Oceanographic data for six potential sites were evaluated and generic site characteristics were developed. The generic site has a 20/sup 0/C temperature differential between the ocean surface and a depth of 1000 m. This temperature differential occurs at a distance of 5 km from shore. Current and projected prices and requirements for electricity and water at potential sites were obtained. The state of the art of components comprising the OC-OTEC plant was reviewed. Design options for each component were identified. The highest performing, least costly, and least technically uncertain design for each component was selected. Component cost and performance models were then developed and integrated into thermoeconomic system models for single- and double-stage OC-OTEC plants that produced electricity and/or fresh water. A computerized optimization procedure was developed to obtain optimal (minimum cost) plant configurations for the production of electricity and/or fresh water. All plant types - floating, moored, shelf-mounted, shallow-water and land-based plants - were evaluated. Based on the state-of-the-art and typical characteristics of potential sites, the primary thrust of the program was directed towards shallow-water and land-based plants. The shallow-water/land-based plant configurations selected had a 5-km long cold-water supply pipe and a 1-km long discharge pipe for the evaporator and condenser.

  3. Building Technologies Program: Tax Deduction Qualified Software- Owens Corning Commercial Energy Calculator (OC-CEC) version 1.1

    Broader source: Energy.gov [DOE]

    Provides required documentation that Owens Corning Commercial Energy Calculator (OC-CEC) version 1.1 meets Internal Revenue Code §179D, Notice 2006-52, dated June 2, 2006, for calculating commercial building energy and power cost savings.

  4. Coastal energy transportation study, phase ii, volume 1: a study of OCS onshore support bases and coal export terminals

    SciTech Connect (OSTI)

    Cribbins, P.D.

    1981-08-01

    This study concentrates on siting alternatives for on-shore support bases for Outer Continental Shelf (OCS) oil and gas exploration and coal export terminals. Sixteen alternative OCS sites are described, and a parametric analysis is utilized to select the most promising sites. Site-specific recommendations regarding infrastructure requirements and transportation impacts are provided. Eleven alternative coal terminal sites are identified and assessed for their potential impacts.

  5. Offshore Code Comparison Collaboration (OC3) for IEA Wind Task 23 Offshore Wind Technology and Deployment

    SciTech Connect (OSTI)

    Jonkman, J.; Musial, W.

    2010-12-01

    This final report for IEA Wind Task 23, Offshore Wind Energy Technology and Deployment, is made up of two separate reports, Subtask 1: Experience with Critical Deployment Issues and Subtask 2: Offshore Code Comparison Collaborative (OC3). Subtask 1 discusses ecological issues and regulation, electrical system integration, external conditions, and key conclusions for Subtask 1. Subtask 2 included here, is the larger of the two volumes and contains five chapters that cover background information and objectives of Subtask 2 and results from each of the four phases of the project.

  6. Analysis of the permitting processes associated with exploration of Federal OCS leases. Final report. Volume II. Appendices

    SciTech Connect (OSTI)

    Not Available

    1980-11-01

    Under contract to the Office of Leasing Policy Development (LPDO), Jack Faucett Associates is currently undertaking the description and analysis of the Outer Continental Shelf (OCS) regulatory process to determine the nature of time delays that affect OCS production of oil and gas. This report represents the results of the first phase of research under this contract, the description and analysis of regulatory activity associated with exploration activities on the Federal OCS. Volume 1 contains the following three sections: (1) study results; (2) Federal regulatory activities during exploration of Federal OCS leases which involved the US Geological Survey, Environmental Protection Agency, US Coast Guard, Corps of Engineers, and National Ocean and Atmospheric Administration; and (3) state regulatory activities during exploration of Federal OCS leases of Alaska, California, Louisiana, Massachusetts, New Jersey, North Carolina and Texas. Volume II contains appendices of US Geological Survey, Environmental Protection Agency, Coast Guard, Corps of Engineers, the Coastal Zone Management Act, and Alaska. The major causes of delay in the regulatory process governing exploration was summarized in four broad categories: (1) the long and tedious process associated with the Environmental Protection Agency's implementation of the National Pollutant Discharge Elimination System Permit; (2) thelack of mandated time periods for the completion of individual activities in the permitting process; (3) the lack of overall coordination of OCS exploratory regulation; and (4) the inexperience of states, the Federal government and industry relating to the appropriate level of regulation for first-time lease sale areas.

  7. Morris, Alexander From: Sent: To: Subject: FOIA-Central@l1q,dOc.qo'/

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Morris, Alexander From: Sent: To: Subject: FOIA-Central@l1q,dOc.qo'/ vVednesday, June 02. 2010,1:30 Ph*' FOIA-Central DOE Headquarters FOI/\ Request Name:;Kevin Bat'on Or'ganization: Amer'iC(}1l Small Business League Add/'ess: 3910 Cypress Dr'ive, Suite 8 Petaluma, CA 94954 ij -, CdV',,,' "" t " ,_, :,./ ~? FAX: 707-789-9580 Phone: 787-789-9575 [mail: kbarorusasb 1. COlli Recor-d De s cr i p t i.on: June 2, 2010 U.S. Department of Energy 1000 Independence Avenue, Sl'J Washington.

  8. Validation of Hydrodynamic Load Models Using CFD for the OC4-DeepCwind Semisubmersible: Preprint

    SciTech Connect (OSTI)

    Benitz, M. A.; Schmidt, D. P.; Lackner, M. A.; Stewart, G. M.; Jonkman, J.; Robertson, A.

    2015-03-01

    Computational fluid dynamics (CFD) simulations were carried out on the OC4-DeepCwind semi-submersible to obtain a better understanding of how to set hydrodynamic coefficients for the structure when using an engineering tool such as FAST to model the system. The focus here was on the drag behavior and the effects of the free-surface, free-ends and multi-member arrangement of the semi-submersible structure. These effects are investigated through code-to-code comparisons and flow visualizations. The implications on mean load predictions from engineering tools are addressed. The work presented here suggests that selection of drag coefficients should take into consideration a variety of geometric factors. Furthermore, CFD simulations demonstrate large time-varying loads due to vortex shedding, which FAST's hydrodynamic module, HydroDyn, does not model. The implications of these oscillatory loads on the fatigue life needs to be addressed.

  9. Dental Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Dental Plan Dental Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office...

  10. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed...

  11. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEP Program Planning Template ("Program Planning Template") SEP Program Planning Template ("Program Planning Template") Program Planning Template More Documents & Publications...

  12. Medical Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Medical Plans Medical Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Medical Plans The Lab offers employees the choice between two medical plans through Blue Cross Blue Shield of New Mexico (BCBS). Both medical plans offer free preventive care and in and out of network coverage from the same network of BCBS providers. High Deductible Health Plan (HDHP) - A more

  13. Seawater test results of open-cycle ocean thermal energy conversion (OC-OTEC) components

    SciTech Connect (OSTI)

    Zangrando, F.; Bharathan, D.; Link, H. ); Panchal, C.B. )

    1994-01-01

    Key components of open-cycle ocean thermal energy conversion systems--the flash evaporator, mist eliminator, passive predeaerator, two surface condenser stages, and two direct-contact condenser stages--have been tested using seawater. These components operate at lower steam pressures and higher inlet noncondensable gas concentrations than do conventional power plant heat exchangers. The rate of heat exchanged between the evaporator and the condenser is on the order of 1.25MW-thermal, requiring a warm seawater flow of about 0.1 m[sup 3]/s; the cold seawater flow is on the order of half the warm water flow. In addition to characterizing the performance of the various components, the system has produced potable water from condensation of the steam produced in the evaporator. The information obtained in these tests is being used to design a larger scale experiment in which net power production is expected to be demonstrate for the first time using OC-OTEC technology.

  14. Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Strategic Plan Print ALS Strategic Plan Update: September 2015 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed projects, new scientific directions, and changing priorities. This most recent revision, Advanced Light Source Strategic Plan: 2015-19 (1.2 MB), was completed in September 2015. The plan encompasses the needs of the scientific community as well as our responses to meeting those needs through development of our

  15. Vision Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Vision Plan Vision Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Vision Plan The Lab offers employees and their eligible dependents free vision coverage through Vision Service Plan (VSP). The plan covers exams, contact lenses, eyeglass lenses and frames. Participants can use any provider but VSP network providers offer the best value and will file the claim

  16. Regional geology of Georges Bank basin - OCS Sale 42 drilling results

    SciTech Connect (OSTI)

    High, L.R. Jr.

    1985-02-01

    Industry bid aggressively in OCS Sale 42, spending $816 million. Eight wildcats were drilled in 1981-82 to test 5 major plays. All wells were dry; no potential reservoir or source rocks were found. The tectonic-stratigraphic framework of the Georges Bank basin is that of an Atlantic-type plate margin. Two major unconformities divide the section into prerift, synrift, and postrift sequences. The prerift sequence consists of Paleozoic metasediments in basement fault blocks. Synrift sediments consist of Newark Group equivalents: the Argo Salt and the Iroquoi Formation. The postrift sequence consists of Mohican red beds overlain by progradational wedges, with the carbonate Abenaki Formation at the base. The objective in 4 of the 8 wildcats was the Iroquois Formation. Mobil 312-1 and Shell 357-1 were drilled into a seismic anomaly interpreted to be a reef. This structure was found to be a complex carbonate mound. Exxon 975-1 was drilled on a seismic amplitude anomaly variously interpreted to be the result of salt, coal, or porous carbonates. This anomaly proved to be caused by a salt bed. The objective in Shell 410-1R was carbonate banks over a basement horst block. No significant zones of porosity were found. The remaining 4 wildcats were drilled on Abenaki prospects. Mobil 273-1, Tenneco 187-1d, and Conoco 145-1 were drilled for possible carbonate banks over a salt structure. Only thin oolitic grainstone intervals were found. Exxon 133-1 was based on a seismic anomaly interpreted to be a patch reef. This feature was found to be a volcanic cone.

  17. Partnership Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Partnership Plan July 2016 July 2016 Page 1 U.S. DRIVE Partnership Plan Table of Contents Foreword ....................................................................................................................................................... 2 Definition ...................................................................................................................................................... 3 Partners

  18. Experiments on oxygen desorption from surface warm seawater under open-cycle ocean thermal energy conversion (OC-OTEC) conditions

    SciTech Connect (OSTI)

    Pesaran, A.A.

    1989-12-01

    This paper reports the results of scoping deaeration experiments conducted with warm surface seawater under open-cycle ocean thermal energy conversion (OC-OTEC). Concentrations of dissolved oxygen in seawater at three locations (in the supply water, water leaving a predeaerator, and discharge water from an evaporator) were measured and used to estimate oxygen desorption levels. The results suggest that 7% to 60% of dissolved oxygen in the supply water was desorbed from seawater in the predeaerator for pressures ranging from 9 to 35 kPa. Bubble injection in the upcomer increased the oxygen desorption rate by 20% to 60%. The dependence of oxygen desorption with flow rate could not be determined. The data also indicated that at typical OC-OTEC evaporator pressures when flashing occurred, 75% to 95% of dissolved oxygen was desorbed overall from the warm seawater. The uncertainty in results is larger than one would desire. These uncertainties are attributed to the uncertainties and difficulties in the dissolved oxygen measurements. Methods to improve the measurements for future gas desorption studies for warm surface and cold deep seawater under OC-OTEC conditions are recommended. 14 refs., 5 figs., 2 tabs.

  19. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Plan NSSAB Members Vote on Work Plan Tasks; The Nevada Site Specific Advisory Board operates on a fiscal year basis and conducts work according to a NSSAB generated and U.S. Department of Energy (DOE) approved work plan. FY 2016 Work Plan Work plan items focus on providing recommendations to the DOE regarding the following subjects: soil contamination from historic atmospheric nuclear testing, remediation of contaminated facilities used to support historic testing, groundwater studies

  20. Legal Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Legal Plan Legal Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Legal Plan Most people need legal advice at one time or another but high legal fees may prevent you from getting the necessary assistance. For a small monthly premium, employees can enroll in legal coverage through ARAG. The plan provides assistance with routine preventive or defensive matters and

  1. Conceptual design of an open-cycle ocean thermal energy conversion net power-producing experiment (OC-OTEC NPPE)

    SciTech Connect (OSTI)

    Bharathan, D.; Green, H.J.; Link, H.F.; Parsons, B.K.; Parsons, J.M.; Zangrando, F.

    1990-07-01

    This report describes the conceptual design of an experiment to investigate heat and mass transfer and to assess the viability of open-cycle ocean thermal energy conversion (OC-OTEC). The experiment will be developed in two stages, the Heat- and Mass-Transfer Experimental Apparatus (HMTEA) and the Net Power-Producing Experiment (NPPE). The goal for the HMTEA is to test heat exchangers. The goal for the NPPE is to experimentally verify OC-OTEC's feasibility by installing a turbine and testing the power-generating system. The design effort met the goals of both the HMTEA and the NPPE, and duplication of hardware was minimal. The choices made for the design resource water flow rates are consistent with the availability of cold and warm seawater as a result of the seawater systems upgrade carried out by the US Department of Energy (DOE), the state of Hawaii, and the Pacific International Center for High Technology Research. The choices regarding configuration of the system were made based on projected performance, degree of technical risk, schedule, and cost. The cost for the future phase of the design and the development of the HMTEA/NPPE is consistent with the projected future program funding levels. The HMTEA and NPPE were designed cooperatively by PICHTR, Argonne National Laboratory, and Solar Energy Research Institute under the guidance of DOE. The experiment will be located at the DOE's Seacoast Test Facility at the Natural Energy Laboratory of Hawaii, Kailua-Kona, Hawaii. 71 refs., 41 figs., 34 tabs.

  2. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    -----Chapter 7.1 (February 2015) ACQUISITION PLANNING Guiding Principles  Sound acquisition planning ensures that the contracting process is conducted in a timely manner, in accordance with statutory, regulatory, and policy requirements, and reflects the mission needs of the program.  An integrated team approach that includes appropriate representation from all organizations having an interest in the requirement will benefit the acquisition planning process.  Contracting professionals

  3. ACTION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    -1 ACTION PLAN 1.0 INTRODUCTION 1.1 PURPOSE The purpose of this action plan is to establish the overall plan for hazardous waste permitting, meeting closure and postclosure requirements, and remedial action under the Federal Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), and the Washington State Hazardous Waste Management Act. All actions required to be taken pursuant to this Agreement shall be taken in accordance

  4. Plan Outline

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    end-use customers for measure installation or project implementation. BPA Action Plan for Energy Efficiency vi EXECUTIVE SUMMARY The Bonneville Power Administration is a leader in...

  5. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... proposals Basic research from non-profit organizations Competitive procurement of ... PLAN FOR ACTION AND ACQUISITION MANAGEMENT -- ANSWERS WHO, WHAT, WHEN, WHERE, ...

  6. Disability Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    through The Hartford. These income protection plans will pay a percentage of your salary when you are unable to work due to illness or injury. Resources STD highlight sheet ...

  7. Retirement Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    of financial resources and the latest financial tools to make saving for retirement easy. ... This plan allows you to save and invest a piece of your paycheck before taxes are taken ...

  8. Evacuation Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Evacuation Planning (see also) This email address is being protected from spambots. You need JavaScript enabled to view it. - TRACC Director Background Evacuation planning in large metropolitan areas requires an analysis of the complex interactions among the initiating event, the affected population, and the systems for transporting the population and emergency responders. Predicting the effects of events, such as the dispersion of a harmful agent in the urban area or waterways, or the

  9. Lab Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lab Plan Ames Laboratory

  10. PROJECT MANAGEMENT PLANS Project Management Plans

    Office of Environmental Management (EM)

    MANAGEMENT PLANS Project Management Plans Overview Project Management Plan Suggested Outline Subjects Crosswalk between the Suggested PMP Outline Subjects and a Listing ...

  11. Berkeley Lab Strategic Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Lab Plan Notable Outcomes Division-Level Strategic Planning Related Links labview Strategic Planning Office The Strategic Planning Office coordinates institutional...

  12. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award

  13. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award

  14. Thrift Savings Plan (TSP)

    Broader source: Energy.gov [DOE]

    The Thrift Savings Plan (TSP) is a voluntary retirement savings and investment plan for federal employees.

  15. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Environmental Stewardship Environmental Protection Community Relations Plan Community Relations Plan Consultations, communications, agreements, and disagreements...

  16. Alaska Strategic Energy Plan and Planning Handbook | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the ...

  17. STRATEGIC PLAN

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 STRATEGIC PLAN and Implementing Framework United States Department of Energy Office of Energy Efficiency and Renewable Energy (This page intentionally left blank) Message from the Assistant Secretary 1 Message from the Assistant Secretary Today, the United States is faced with a national imperative to address the enormous challenge presented by climate change and to seize upon the multi-trillion dollar economic opportunity that a transition to a global clean energy economy will provide. In his

  18. 2013 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  19. 2014 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  20. 2015 Planning Cycle

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Projects Expand Projects Skip navigation links Ancillary and Control Area Services (ACS) Practices Forum Attachment K 2015 Planning Cycle 2014 Planning Cycle 2013 Planning...

  1. DOE CONTRACTOR PENSION PLANS

    Broader source: Energy.gov (indexed) [DOE]

    ... plan(s) to maximize the contribution predictability (i.e. forecasting accuracy) and contain current and future costs, to include rationale for selection of all plan assumptions ...

  2. ORISE: Exercise Planning

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Exercise Planning Exercise Planning The Oak Ridge Institute for Science and Education (ORISE) helps federal, state and local emergency management personnel plan and prepare for the...

  3. Annual Training Plan Template

    Broader source: Energy.gov [DOE]

    The Annual Training Plan Template is used by an organization's training POC to draft their organization's annual training plan.

  4. DOE Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    DOE Plans DOE Plans DOE Strategic Plans Strategic Plan for the Department of Energy Environmental Restoration Strategic Plan (PDF) DOE Chief Information Officer Strategic Plan Chicago Strategic Plan (PDF)

  5. Strategic Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Energy Planning Presentation Agenda * Strategic Energy Planning - Strategic Energy Planning (SEP) Workbook - What is it? - The process - The plan * Activity 2 1/28/2016 2 Strategic Energy Plan and Planning Handbook * Provides a step-by-step process that Tribes may wish to use as a road map for discussion and decisions related to strategic energy planning and energy project prioritization * Includes blank text boxes for communities to input their own information and outcomes from energy

  6. Measurements of gas sorption from seawater and the influence of gas release on open-cycle ocean thermal energy conversion (OC-OTEC) system performance

    SciTech Connect (OSTI)

    Penney, T.R.; Althof, J.A.

    1985-06-01

    The technical community has questioned the validity and cost-effectiveness of open-cycle ocean thermal energy conversion (OC-OTEC) systems because of the unknown effect of noncondensable gas on heat exchanger performance and the power needed to run vacuum equipment to remove this gas. To date, studies of seawater gas desorption have not been prototypical for system level analysis. This study gives preliminary gas desorption data on a vertical spout, direct contact evaporator and multiple condenser geometries. Results indicate that dissolved gas can be substantially removed before the seawater enters the heat exchange process, reducing the uncertainty and effect of inert gas on heat exchanger performance.

  7. Hanford Site Development Plan

    SciTech Connect (OSTI)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. ); Yancey, E.F. )

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  8. Tax-Advantaged Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Tax-Advantaged Plans Tax-Advantaged Plans A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow....

  9. ENERGY Workforce Restructuring Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ENERGY Workforce Restructuring Plan for the Idaho Operations Office March 2016 WORKFORCE RESTRUCTURING PLAN For the Idaho Operations Office Table of Contents I. INTRODUCTION...................................................................................................................................................... 1 Executive Summary ................................................................................................................................................ 1

  10. Plans, Updates, Regulatory Documents

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Permit for Storm Water Documents Individual Permit NPDES No. NM0030759 (pdf) Storm Water Plans Site Discharge Pollution Prevention Plan (SDPPP) Volume 1 - Los AlamosPueblo...

  11. Digital Data Management Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    energy physics through experiments that strengthen our fundamental understanding of matter, energy, space, and time. Plans HAWC gamma-Ray Observatory Data Management Plan (pdf)...

  12. ACQUISITION PLANNING | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ACQUISITION PLANNING ACQUISITION PLANNING PDF icon ACQUISITION PLANNING More Documents & Publications ACQUISITION PLANNING Policy Flash 2015-13 POLICY FLASH 2014-25 Revision to the...

  13. ACQUISITION PLANNING | Department of Energy

    Energy Savers [EERE]

    ACQUISITION PLANNING ACQUISITION PLANNING ACQUISITION PLANNING More Documents & Publications ACQUISITION PLANNING Attachment FY2011-13 Attachment FY2011-40(3)...

  14. Tax Credits, Rebates & Savings | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Ocala Utility Services- Energy Efficiency Rebate Program Ocala Utility Services Electric and Telecommunications is a community owned utility that serves around 50,000 customers in...

  15. SEP Program Planning Template ("Program Planning Template") ...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    File Program Planning Template More Documents & Publications Commute Mode Switching Impact Tool Energy Intensity Indicators Data Refrigerator-Freezers (multiple defrost waiver)...

  16. Accelerated life test of the USDOE OC-OTEC experimental system refurbished with magnetic bearings for the 3rd stage vacuum compressor. Final report

    SciTech Connect (OSTI)

    Vega, L.A.

    1997-04-01

    This report documents the accelerated life test (time-to-failure) performed, at the request of DOE, to evaluate the viability of the magnetic bearing system installed in the stage 3 vacuum pump. To this effect the plant was successfully operated for over 500 hours during the period September-November 1996. The first part of this report discusses system performance by deriving subsystem and system performance parameters from a typical record. This is followed by the discussion of the life tests. The instrumentation used to estimate the performance parameters given here is depicted. The third stage pump was operated for 535 hours without incident. It is concluded that magnetic bearings are the preferable choice for the OC-OTEC centrifugal vacuum pumps.

  17. Observation of multiple ionization pathways for OCS in an intense laser field resolved by three-dimensional covariance mapping and visualized by hierarchical ionization topology

    SciTech Connect (OSTI)

    Bryan, W. A.; Newell, W. R.; Sanderson, J. H.; Langley, A. J. [Department of Physics and Astronomy, University College London, Gower Street, London WC1E 6BT (United Kingdom); Department of Physics, University of Waterloo, Waterloo, Ontario, N2L 3G1 (Canada); Central Laser Facility, Rutherford Appleton Laboratory, Chilton, Didcot, Oxon OX11 0QX (United Kingdom)

    2006-11-15

    The two- and three-body Coulomb explosion of carbonyl sulfide (OCS) by 790 nm, 50 fs laser pulses focused to {approx_equal}10{sup 16} W cm{sup -2} has been investigated by the three-dimensional covariance mapping technique. In a triatomic molecule, a single charge state, in this case the trication, has been observed to dissociate into two distinct energy channels. With the aid of a three-dimensional visualization technique to reveal the ionization hierarchy, evidence is presented for the existence of two sets of ionization pathways resulting from these two initial states. While one group of ions can be modeled using a classical enhanced ionization model, the second group, consisting of mainly asymmetric channels, cannot. The results provide clear evidence that an enhanced ionization approach must also be accompanied by an appreciation of the effects of excited ionic states and multielectronic processes.

  18. Comparison of Hydrodynamic Load Predictions Between Engineering Models and Computational Fluid Dynamics for the OC4-DeepCwind Semi-Submersible: Preprint

    SciTech Connect (OSTI)

    Benitz, M. A.; Schmidt, D. P.; Lackner, M. A.; Stewart, G. M.; Jonkman, J.; Robertson, A.

    2014-09-01

    Hydrodynamic loads on the platforms of floating offshore wind turbines are often predicted with computer-aided engineering tools that employ Morison's equation and/or potential-flow theory. This work compares results from one such tool, FAST, NREL's wind turbine computer-aided engineering tool, and the computational fluid dynamics package, OpenFOAM, for the OC4-DeepCwind semi-submersible analyzed in the International Energy Agency Wind Task 30 project. Load predictions from HydroDyn, the offshore hydrodynamics module of FAST, are compared with high-fidelity results from OpenFOAM. HydroDyn uses a combination of Morison's equations and potential flow to predict the hydrodynamic forces on the structure. The implications of the assumptions in HydroDyn are evaluated based on this code-to-code comparison.

  19. Tribal Strategic Energy Plan and Planning Handbook

    Broader source: Energy.gov [DOE]

    The Tribal Strategic Energy Plan and Planning Handbook, published by the DOE Office of Indian Energy, is a tool for Tribes to use to help achieve energy goals in both the near- and long-term. This Handbook intends to help tribal leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building.

  20. Alaska Strategic Energy Plan and Planning Handbook

    Broader source: Energy.gov [DOE]

    The Alaska Strategic Energy Plan and Planning Handbook, published by the Office of Indian Energy, is a tool for Alaska Native Villages and communities to use in achieving energy goals in both the near- and long-term. This Handbook intends to help Alaska Native leaders and community members define their unique energy goals and priorities through stakeholder input, dialog, and consensus-building.

  1. Decommissioning Plan RM

    Broader source: Energy.gov [DOE]

    The Decommissioning Plan Review (DPR) Module is a tool that assists DOE federal project review teams in evaluating the adequacy of the decommissioning plan prior to approval of the associated CD.

  2. Sample Project Execution Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The project execution plan (PEP) is the governing document that establishes the means to execute, monitor, and control projects.  The plan serves as the main communication vehicle to ensure that...

  3. Climate Change Adaptation Planning

    Broader source: Energy.gov [DOE]

    This course provides an introduction to planning for climate change impacts, with examples of tribes that have been going through the adaptation planning process. The course is intended for tribal...

  4. State Energy Strategic Plans

    Broader source: Energy.gov [DOE]

    Most state energy offices across the country are required to have current and long-term strategic energy management plans in place. These strategic plans help to ensure that state agencies are...

  5. Action Plan - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Agreement Action Plan Tri-Party Agreement The Agreement Action Plan Announcements List of Approved Changes TPA Project Manager's Lists Modifications for Public Comment Data Management MP-14 WIDS Information Hanford Site Waste Management Units Report Hanford Public Involvement Plan Administrative Record (AR) Related Links Action Plan Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Executive Summary 1.0 Introduction 1.1 Purpose 1.2 Regulatory Authorities 1.3

  6. Business Planning Resources

    Broader source: Energy.gov [DOE]

    Business Planning Resources, a presentation of the U.S. Department of Energy's Better Buildings Neighborhood Program.

  7. Biennial Plan Summary

    National Nuclear Security Administration (NNSA)

    ` Fiscal Year 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary Report to Congress March 2016 National Nuclear Security Administration United States Department of Energy Washington, DC 20585 Department of Energy/National Nuclear Security Administration | March 2016 Fiscal Year 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary | Page i Message from the Administrator This Department of Energy's (DOE) National Nuclear Security Administration (NNSA) Fiscal

  8. OREM Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Oak Ridge Office of Environmental Management's Program Plan discusses the vision, goals, and strategy for 2014-2024.

  9. EERE Strategic Plan Briefing

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Strategic Plan Briefing 2 EERE Strategic Plan 3 Strategic Plan Input 4 Strategic Plan Implementation 5 A strong and prosperous America, powered by clean, affordable, and secure energy EERE Vision 6 To create and sustain American leadership in the transition to a global clean energy economy EERE Mission 7 EERE Organizational Principles * Economic Prosperity * Affordability * Reduced Environmental Impact * Energy Security * Consumer Choice 8 EERE Five Core Questions * Impact Is this a

  10. Community Commitment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    extends Community Commitment Plan September 18, 2012 LANS Board of Governors extends Community Commitment Plan The Los Alamos National Security, LLC Board of Governors recently voted to extend its Community Commitment Plan for one year. The plan invests $3 million of the company's management fee each year in regional education, economic development and community giving programs. It is managed by LANL's Community Programs Office and was launched in 2006 when LANS won the prime contract to manage

  11. Mitigation Action Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  12. Mitigation Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Mitigation Action Plan FutureGen 2.0 Project DOE/EIS-0460 U.S. Department of Energy National Energy Technology Laboratory March 2014 DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN INTENTIONALLY LEFT BLANK DOE/EIS-0460 FUTUREGEN 2.0 PROJECT MITIGATION ACTION PLAN TABLE OF CONTENTS Introduction ................................................................................................................................................... 1 Purpose

  13. 2014 Energy Sector Specific Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sector-Specific Plan Energy Sector-Specific Plan 2015 ii Page intentionally left blank Energy Sector-Specific Plan 2015 iii TABLE OF CONTENTS PREFACE ......

  14. planning | OpenEI Community

    Open Energy Info (EERE)

    planning Home Jweers's picture Submitted by Jweers(88) Contributor 27 September, 2012 - 07:53 Detailed Planning Kicks Off planning Skype call this morning to discuss details. More...

  15. Operating plan FY 1998

    SciTech Connect (OSTI)

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  16. OC_IC_DIGITAL.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    OCIO Leadership OCIO Leadership Michael M. Johnson Chief Information Officer More about Michael M. Johnson Robert G. Green Principal Deputy CIO for Enterprise Information Resources Management More about Robert G. Green Sarah L. Gamage Deputy CIO for Resources Management More about Sarah Gamage Allan Manuel Deputy CIO for Enterprise Policy, Portfolio Management & Governance More about Allan Manuel Renee Forney (Acting) Deputy CIO for Cybersecurity More about Renee Forney (Acting) Paul

  17. Performance Evaluation and Measurement Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ......... 4 PEMP ORGANIZATION Fee Determining Official ... Evaluation and Measurement Plan (PEMP) is an award fee plan containing both ...

  18. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2015 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including Administrative Change 1 issued on January 31, 2011 and the

  19. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Laboratory-Directed Research and Development Program FY2016 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2016 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including

  20. LDRD Program Plan master

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Program Plan Thomas Jefferson National Accelerator Facility Newport News, Virginia Thomas Jefferson National Accelerator Facility Laboratory-Directed Research and Development Program FY2014 Program Plan Introduction The Thomas Jefferson National Accelerator Facility (Jefferson Lab) Laboratory- Directed Research and Development (LDRD) program was planned through a formal management process consistent with DOE Order 413.2B, including Administrative Change 1 issued on January 31, 2011 and the

  1. IDC Integrated Master Plan.

    SciTech Connect (OSTI)

    Clifford, David J.; Harris, James M.

    2014-12-01

    This is the IDC Re-Engineering Phase 2 project Integrated Master Plan (IMP). The IMP presents the major accomplishments planned over time to re-engineer the IDC system. The IMP and the associate Integrated Master Schedule (IMS) are used for planning, scheduling, executing, and tracking the project technical work efforts. REVISIONS Version Date Author/Team Revision Description Authorized by V1.0 12/2014 IDC Re- engineering Project Team Initial delivery M. Harris

  2. DOE Retro Analysis Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Retro Analysis Plan August 2, 2011 Page 1 August 2, 2011 Daniel Cohen, Esq. Office of General Counsel U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Re: Preliminary Plan for Retrospective Analysis Dear Mr. Cohen: These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice appearing in the July 11, 2011 Federal Register requesting comments on the Preliminary Plan for

  3. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community, Environment » Environmental Stewardship » Environmental Protection » Community Relations Plan Community Relations Plan Consultations, communications, agreements, and disagreements between the Permittees and the public are documented during the Hazardous Waste Facility Permit Community Relations Plan development. Contact Environmental Communication & Public Involvement PO Box 1663, MS M996 Los Alamos, NM 87544 (505) 667-0216 Email We welcome your comments and suggestions on how

  4. Plan Design Highlights for:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LEGAL NOTICES: Access federal and state legal notices related to your plan: deltadentalins.com/about/legal/index-enrollee.html 1 In Texas, Delta Dental Insurance Company offers a Dental Provider Organization (DPO) plan. 2 Enrollees are responsible for any coinsurance, deductible, amount over the plan maximum and charges for non-covered services. 3 Verify that your dentist is a contracted Delta Dental PPO network dentist before each appointment. 4 Applies only to procedures covered under your

  5. Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community Relations Plan Community Relations Plan The Laboratory maintains an open working relationship with communities and interested members of the public. August 1, 2013 Guests listen to Lab historian Ellen McGhee on tour of historical sites Guests listen to Laboratory historian Ellen McGhee on a tour of historical sites. What the plan does Establishes a productive government-to-government relationship with local tribes and pueblos Keeps communities and interested members of the public

  6. Training Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for system/software development and installation Training Plan (63.82 KB) More Documents & Publications System Design Transition Plan Conversion Plan

  7. Regional Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hydroelectric Reciprocating Internal Combustion Engine Fossil Fuel Turbines Alaska Energy Statistics, 2011 4 Energy Costs Vary 5 Regional Energy Planning * Energy Pathways led to ...

  8. planning for emergencies

    National Nuclear Security Administration (NNSA)

    1%2A en Planning for Emergencies http:nnsa.energy.govaboutusourprogramsemergencyoperationscounterterrorismplanningforemergencies

  9. Site Sustainability Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    436.1 SITE SUSTAINABILITY PLAN Princeton Plasma Physics Laboratory PPPL is operated by ... Laboratory Director, Operations Princeton Plasma Physics Laboratory December 2014 FY 2015 ...

  10. State Energy Strategic Planning

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 3, 2013 and dealing with state energy strategic planning.

  11. BPA Energy Efficiency Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    BPA Energy Efficiency Plan Pages default Sign In About | Careers | Contact | Investors | bpa.gov Search Policy & Reporting Expand Policy & Reporting EE Sectors Expand EE...

  12. Regional Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    AEA is an independent and public corporation of the State of Alaska Created by ... for final draft development and interface with AkAES 7 Alaska's Energy Plans ...

  13. Site Sustainability Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Regional and Local Planning ......10.2 Emergency Response Procedures and ... the prospects and problems of post-remediation care ...

  14. DOE CONTRACTOR PENSION PLANS

    Energy Savers [EERE]

    Contractor's workforce and sponsors the employee pension and benefit plans; or (b) ... DOE-H-200x EMPLOYEE COMPENSATION: PAY AND BENEFITS (a) Contractor Employee Compensation ...

  15. DRAFT Bear Safety Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Bear Safety Plan June 2010 NSAbspRev9.doc 1 Atmospheric Radiation Measurement Climate Research Facility North Slope of AlaskaAdjacent Arctic Ocean (ACRFNSAAAO) Bear Safety ...

  16. STANDARD REVIEW PLAN

    Office of Environmental Management (EM)

    of Nuclear Facilities Standard Review Plan Safety Design Strategy January 2015 OFFICE OF ENVIRONMENTAL MANAGEMENT ... safety, environment, security, and quality assurance, ...

  17. Visual Sample Plan Flyer

    Office of Energy Efficiency and Renewable Energy (EERE)

    This flyer better explains that VSP is a free, easy-to-use software tool that supports development of optimal sampling plans based on statistical sampling theory.

  18. Long Range Development Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    scientific missions. Science drives the Lab's development. LRDPs establish a framework of land-use principles and policies to guide future growth and change through 2025. The plan...

  19. Site Transition Plan Guidance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan Guidance Site Transition Plan Guidance Site Transition Plan Guidance PDF icon Site Transition Plan Guidance More Documents & Publications Development of Site Transition Plan, ...

  20. Guidelines for strategic planning

    SciTech Connect (OSTI)

    Not Available

    1991-07-01

    Strategic planning needs to be done as one of the integral steps in fulfilling our overall Departmental mission. The role of strategic planning is to assure that the longer term destinations, goals, and objectives which the programs and activities of the Department are striving towards are the best we can envision today so that our courses can then be set to move in those directions. Strategic planning will assist the Secretary, Deputy Secretary, and Under Secretary in setting the long-term directions and policies for the Department and in making final decisions on near-term priorities and resource allocations. It will assist program developers and implementors by providing the necessary guidance for multi-year program plans and budgets. It is one of the essential steps in the secretary's Strategic Planning Initiative. The operational planning most of us are so familiar with deals with how to get things done and with the resources needed (people, money, facilities, time) to carry out tasks. Operating plans like budgets, capital line item projects, R D budgets, project proposals, etc., are vital to the mission of the Department. They deal, however, with how to carry out programs to achieve some objective or budget assumption. Strategic planning deals with the prior question of what it is that should be attempted. It deals with what objectives the many programs and activities of the Department of Department should be striving toward. The purpose of this document is to provide guidance to those organizations and personnel starting the process for the first time as well as those who have prepared strategic plans in the past and now wish to review and update them. This guideline should not be constructed as a rigid, restrictive or confining rulebook. Each organization is encouraged to develop such enhancements as they think may be useful in their planning. The steps outlined in this document represent a very simplified approach to strategic planning. 9 refs.

  1. Draft 2014 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Draft 2014 Annual Plan Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan Section 999 - Draft 2014 Annual Plan (4.52 MB) More Documents & Publications 2011 Annual Plan 2013 Annual Plan Sec. 999 Annual Plan 2012

  2. 2012 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan 2012 Annual Plan Section 999: 2012 Annual Plan Section 999 - 2012 Annual Plan (3.97 MB) More Documents & Publications 2011 Annual Plan Sec. 999 Annual Plan 2012 2013 Annual Plan

  3. Strategic Energy Planning

    Broader source: Energy.gov [DOE]

    Comprehensive strategic energy planning, whether at the state, local, or tribal level, is a critical building block for sound energy management and for advancing a clean energy economy in your jurisdiction. Use these resources—including step-by-step guides, tools, templates, trends, and examples—to develop a strategic energy plan.

  4. Environmental protection Implementation Plan

    SciTech Connect (OSTI)

    R. C. Holland

    1999-12-01

    This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

  5. WREP Mitigation Action Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Electrical Interconnection of the Whistling Ridge Energy Project 1 Mitigation Action Plan June 2015 Mitigation Action Plan for the Whistling Ridge Energy Project Measure Implementation Timeline Implementation Responsibility Earth (geology, soils, topography, and geologic hazards) Prior to Project construction, confirm subsurface soil and rock types and strength properties through a detailed geotechnical investigation of the specific locations of all wind Project elements, including wind

  6. Transmission Planning Analysis Tool

    Energy Science and Technology Software Center (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identifymore » weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.« less

  7. Transmission Planning Analysis Tool

    SciTech Connect (OSTI)

    2015-06-23

    Developed to solve specific problem: Assist transmission planning for regional transfers in interconnected power systems. This work was originated in a study for the U.S. Department of State, to recommend transmission reinforcements for the Central American regional system that interconnects 6 countries. Transmission planning analysis is currently performed by engineers with domainspecific and systemspecific knowledge without a unique methodology. The software codes of this disclosure assists engineers by defining systematic analysis procedures to help identify weak points and make decisions on transmission planning of regional interconnected power systems. Transmission Planning Analysis Tool groups PSS/E results of multiple AC contingency analysis and voltage stability analysis and QV analysis of many scenarios of study and arrange them in a systematic way to aid power system planning engineers or transmission operators in effective decision]making process or in the off]line study environment.

  8. The Sellafield Plan - 12458

    SciTech Connect (OSTI)

    Irving, Iain

    2012-07-01

    The Sellafield Performance Plan represents the start of a new era for the Sellafield site. It is a key driver in the Nuclear Management Partners mission to make Sellafield safer, cleaner, more productive, more cost effective and a better neighbour. When published in summer 2011, the Sellafield Performance Plan set out exactly what work would be completed at Sellafield between 2010/11 and 2025/26, how all of the facilities on the site interact, and what new facilities would be needed in order to deliver the risk and hazard reduction mission. The plan is the first credible and underpinned lifetime plan for the Sellafield site - the most complex part of the UK's civil nuclear estate. Under the Sellafield Performance Plan there are projected to be more jobs longer creating opportunities for the site, its workforce and the economic stability of West Cumbria. The Sellafield Ltd performance plan sets out how NMP will apply their global experience to improve operations, generate efficiencies and deliver detailed programmes of work with the aim of accelerating decommissioning and providing value for money. Successful delivery of the plan will also ensure the site continues to effectively operate critical national infrastructure that supports the UK's energy programme, and maintains the safe and secure management and storage of nuclear materials. The NDA and UK Government have demonstrated their confidence in NMP and Sellafield Ltd's capability to deliver this plan by providing the highest-ever Annual Site Funding Limit for the site in 2011/12. The Sellafield Performance Plan also creates both the foundation and the environment for a vibrant West Cumbrian economy through significant opportunities for the local supply chain and real prospects for further inward investment. By working flexibly and accelerating the decommissioning programme, the plan provides the opportunity for significant retraining to adapt to future challenges on the site and for other potential new nuclear

  9. ACQUISITION PLANNING | Department of Energy

    Office of Environmental Management (EM)

    More Documents & Publications 7pt1AcquisitionPlanning.pdf Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Update of Acquisition Guide Chapter 7.1, Acquisition Planning

    ACQUISITION PLANNING (742.74 KB) More Documents & Publications Acquisition Guide Chapter 7.1 - Acquisition Planning Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Policy Flash 2015-13

  10. EMSL Strategic Plan 2008

    SciTech Connect (OSTI)

    Campbell, Allison A.

    2008-08-15

    This Strategic Plan is EMSL’s template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges of the Department of Energy and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE’s Office of Biological and Environmental Research, and other key stakeholders. This Strategic Plan is fully aligned with the strategic plans of DOE and its Office of Science. We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Strategic Plan should be viewed as a living document for which we will continually evaluate changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly.

  11. ES H action plan

    SciTech Connect (OSTI)

    Not Available

    1991-01-01

    This document contains planned actions to correct the deficiencies identified in the Pre-Tiger Team Self-Assessment (PTTSA), January 1991, of Sandia National Laboratories (SNL -- Albuquerque, New Mexico; Tonopah, Nevada; and Kauai, Hawaii). The Self-Assessment was conducted by a Self-Assessment Working Group consisting of 19 department managers, with support from Environment, Safety, and Health (ES H) professionals, from October through December 1990. Findings from other past audits, dating back to 1985, were reviewed and compared with the PTTSA findings to determine if additional findings, key findings, or root causes were warranted. The resulting ES H Action Plan and individual planned actions were prepared by the ES H Action Plan Project Group with assistance from the Program owners/authors during February and March 1991. The plan was reviewed by SNL Management in April 1991. This document serves as a planning instrument for the Laboratories to aid in the scoping and sizing of activities related to ES H compliance for the coming five years. It will be modified as required to ensure a workload/funding balance and to address the findings resulting from the Tiger Team assessment at SNL, Albuquerque. The process of producing this document has served well to prepare SNL, Albuquerque, for the coming task of producing the required post-Tiger Team action plan document. 8 tabs.

  12. EMSL Contribution Plan

    SciTech Connect (OSTI)

    Campbell, Allison A.

    2008-12-01

    This Contribution Plan is EMSL’s template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOE’s Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSL’s workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSL’s long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2

  13. Operational Area Monitoring Plan

    Office of Legacy Management (LM)

    ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan

  14. Environmental monitoring plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.

  15. Standard Review Plan Overview

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Framework for EM Projects Critical Decision (CD) Milestones Review & Approval Standard Review Plan (SRP) E n v i r o n m e n t a l M a n a g e m e n t DOE - EM - SRP - 2010 2nd Edition Overview March 2010 This page intentionally left blank. Standard Review Plan, 2 nd Edition, March 2010 1 Standard Review Plan Overview Technical Framework for EM Projects Critical Decision Milestones Review and Approval The Office of Environmental Management (EM) is responsible for managing the

  16. Aquisition Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Aquisition Plan Aquisition Plan This template is used for documenting the plans for acquiring hardware, software and communications equipment for a systems development project. Aquisition Plan (51.82 KB) More Documents & Publications Feasibility Study Report Template System Design Training Plan

  17. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    SciTech Connect (OSTI)

    Frazier, T.P.

    1994-10-20

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans.

  18. Quality Assurance Project Plan

    SciTech Connect (OSTI)

    Holland, R. C.

    1998-06-01

    This Quality Assurance Project Plan documents the quality assurance activities for the Wastewater/Stormwater/Groundwater and Environmental Surveillance Programs. This QAPP was prepared in accordance with DOE guidance on compliance with 10CFR830.120.

  19. Technical Planning Basis

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2007-07-11

    The Guide assists DOE/NNSA field elements and operating contractors in identifying and analyzing hazards at facilities and sites to provide the technical planning basis for emergency management programs. Supersedes DOE G 151.1-1, Volume 2.

  20. Community Strategic Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    path to achieve your desired energy future * Clarifies key performance indicators * Documents the game plan for short- and long-term success 3 And what does it do for you? vs. ...

  1. Draft Closure Plan

    Office of Environmental Management (EM)

    ATTACHMENT G.15 TECHNICAL AREA 54, AREA L OUTDOOR CONTAINER STORAGE UNIT CLOSURE PLAN Los Alamos National Laboratory Hazardous Waste Permit December 2014 TABLE OF CONTENTS LIST OF TABLES ....................................................................................................................................... iv LIST OF FIGURES ..................................................................................................................................... v 1.0 INTRODUCTION

  2. Mon Valley work plan

    Office of Legacy Management (LM)

    GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for ... . . . . . . . . 1-1 1.3 Sources of Ground-Water Contamination from Milling Operations . . ...

  3. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DECEMBER 2014 CARBON STORAGE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER ... within the context of an integrated system of capture, transport, and storage ...

  4. Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  5. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    ... Example 23 6.0 Project Execution 6.01 Work Specification and Planning with Safety ... All work will incorporate the core principles of Integrated Safety Management. 6.01.02 ...

  6. Planning for the future

    SciTech Connect (OSTI)

    Lesh, Pamela

    2009-06-15

    Four changes to integrated resource planning could significantly improve alignment between future utility spending and the forces and changes that are upending past preconceptions of how to predict future load. (author)

  7. SNL Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... of concern CRP Community Relations Plan DOD U.S. Department of Defense DOE U.S. ... Tours DOE and the Department of Defense (DOD) provide information about ongoing ...

  8. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  9. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  10. PROJECT MANGEMENT PLAN EXAMPLES Project Management Plan Examples

    Office of Environmental Management (EM)

    Management Plan Examples The following material has been extracted from several project management plans. The order in which it is presented is arbitrary. The elements table below ...

  11. Report: Strategic Planning Impacts

    Office of Environmental Management (EM)

    Strategic Planning Impacts September 30, 2009 Submitted by the EMAB ARRA Implementation and Oversight Subcommittee Background: EM plans to use the influx of stimulus funding from the American Recovery and Reinvestment Act (ARRA) to fulfill compliance agreements, complete construction projects, and address the program's lower-tier activities such as decontamination and decommissioning (D&D) and soil and groundwater remediation. Using the ARRA funds to reduce the physical size of the EM

  12. Quality Work Plan Requirements

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization services and leverages the resources developed through the Guidelines for Home Energy Professionals project. Below you will find links to QWP guidance, as well as links to the individual requirements.

  13. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP)

  14. Career Planning - SRSCRO

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    banner-career-planning Career Planning for the Nuclear Industry Some people are surprised to learn just how many types of careers exist in the nuclear industry. From construction of nuclear facilities to operation, maintenance and research, many types of skills are needed in Professional, Technician, Engineer and Craft categories. To see types of nuclear industry jobs, click here. To see descriptions of nuclear industry jobs, click here. Whether you are considering a career change or just

  15. Environmental implementation plan

    SciTech Connect (OSTI)

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  16. TWRS safety management plan

    SciTech Connect (OSTI)

    Popielarczyk, R.S., Westinghouse Hanford

    1996-08-01

    The Tank Waste Remediation System (TWRS) Safety Management Program Plan for development, implementation and maintenance of the tank farm authorization basis is described. The plan includes activities and procedures for: (a) Updating the current Interim Safety Basis, (b) Development,implementation and maintenance of a Basis for Interim Operations, (c) Development, implementation and maintenance of the Final Safety Analyses Report, (d) Development and implementation of a TWRS information Management System for monitoring the authorization basis.

  17. Site Sustainability Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 DOE ORDER 436.1 SITE SUSTAINABILITY PLAN Princeton Plasma Physics Laboratory PPPL is operated by Princeton University for the U.S. Department of Energy under contract DE-AC02-09CH1 PLAN APPROVAL Robert S. Sheneman Deputy Head Environment, Safety, Health & Security Department Michael Viola Head, Facilities & Site Services Division Jerry D. Levine Head, Environment, Safety, Health & Security Department William B. Davis Head, Information Technology Department, CIO Michael D. Williams

  18. Update on Franklin retirement plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Update on Franklin retirement plans Update on Franklin retirement plans February 21, 2012 by Helen He NERSC is making progress on plans to acquire our next major system. Franklin's...

  19. System Plan Revision 5 + 6

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Plan Revision 7 General Overview DaBrisha Smith (DOEORP) April 10, 2013 System Plan 101 * What is System Planning - A process used by organizations to design, analyze and define ...

  20. Workforce Plans | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Workforce Planning is an integral part of the human capital planning process. The intent ... The purpose of the workforce Plan is to provide focus and direction to Human Resources ...

  1. Transition Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Transition Plan Transition Plan This template is used to define the objectives, resources, and plans for systems transition, e.g., scheduling the transition from acceptance testing to full operational status, identifying staffing and training needs for system operation and maintenance, planning for data migration, etc Transition Plan (35.86 KB) More Documents & Publications System Design Feasibility Study Report Template Configuration Management Plan

  2. Performance Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Plans Performance Plans November 13, 2015 Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan November 6, 2014 Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs 2015 and 2016 Annual Performance Plan December 13,

  3. Rulison Monitoring Plan

    SciTech Connect (OSTI)

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile radionuclides

  4. 2011 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan 2011 Annual Plan Section 999: 2011 Annual Plan Section 999: 2011 Annual Plan (5.47 MB) More Documents & Publications Recommendations: Draft 2008 Section 999 Annual Plan Sec. 999 Annual Plan 2012 UDAC Meeting - February 2011

  5. ARM - Lesson Plans: Air Pressure

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Teachers' Toolbox Lesson Plans Lesson Plans: Air Pressure Objective The objective of this ... Important Points to Understand Air has weight and exerts pressure on everything with which ...

  6. 2016 Plan Options for Retirees

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Options 2016 Plan Options for Retirees Information for LANS retirees Contacts Retiree Insurance Providers Non-Medicare retirees HDHP plan highlights (pdf) HDHP summary of benefits...

  7. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Annual Lab Plan - Other plans (SiteFacilities, WFD, etc) * Execute--perform technical & business functions - Management systems (CAS) * Check--measureanalyze & evaluate...

  8. Planning for Years to Come

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education ...

  9. Soboba Strategic Tribal Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    all tribal members past, present, and future. - Clean Water ... - The Final Strategic Energy Planning document ... work on an approved 12 month project implementation plan. ...

  10. NUGEX 2014 Meeting Planning Subcommittee

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2014 Meeting Planning Subcommittee NUGEX 2014 Meeting Planning Subcommittee Members Frank Tsung, UCLA (HEPFES) Gary Grest, Sandia (BES) Last edited: 2013-06-03 11:04:4...

  11. Realistic Financial Planning and Rapid

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Realistic Financial Planning and Rapid Modification to Project Execution are Essential ... Ignition Facility Title: Realistic Financial Planning and Rapid Modification to ...

  12. Federal Building Metering Implementation Plan Template | Department...

    Office of Environmental Management (EM)

    Implementation Plan Template Federal Building Metering Implementation Plan Template Document provides a template for a federal building metering implementation plan....

  13. WIPP - Passive Institutional Controls (PICs) Plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Plans Files below are in PDF format and can be viewed with Adobe Acrobat Reader. PICs Implementation Plan Permanent Markers Implementation Plan Permanent Markers Testing Plan

  14. Appendix K Disposal Cell Groundwater Monitoring Plan

    Office of Legacy Management (LM)

    K Disposal Cell Groundwater Monitoring Plan

  15. Strategic Energy Planning Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Energy Planning Resources Strategic Energy Planning Resources Below are resources for Tribes on strategic energy planning. Learn more about strategic energy planning. ...

  16. Creating Sample Plans

    Energy Science and Technology Software Center (OSTI)

    1999-03-24

    The program has been designed to increase the accuracy and reduce the preparation time for completing sampling plans. It consists of our files 1. Analyte/Combination (AnalCombo) A list of analytes and combinations of analytes that can be requested of the onsite and offsite labs. Whenever a specific combination of analytes or suite names appear on the same line as the code number, this indicates that one sample can be placed in one bottle to bemore » analyzed for these paremeters. A code number is assigned for each analyte and combination of analytes. 2. Sampling Plans Database (SPDb) A database that contains all of the analytes and combinations of analytes along with the basic information required for preparing a sample plan. That basic information includes the following fields; matrix, hold time, preservation, sample volume, container size, if the bottle caps are taped, acceptable choices. 3. Sampling plans create (SPcreate) a file that will lookup information from the Sampling Plans Database and the Job Log File (JLF98) A major database used by Sample Managemnet Services for recording more than 100 fields of information.« less

  17. Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  18. Optics Supply Planning System

    SciTech Connect (OSTI)

    Gaylord, J

    2009-04-30

    The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system

  19. Energy Organizational Planning

    SciTech Connect (OSTI)

    Gina C. Paradis; James Yockey; Tracey LeBeau

    2009-04-17

    As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

  20. 3RS action plan

    SciTech Connect (OSTI)

    Not Available

    1990-01-01

    The goal of the Solid Waste Interim Steering Committee (SWISC) process is to develop a long-term waste management system for the Greater Toronto Area (GTA), to be in place by 1996, which is environmentally, socially, economically and technically sound. This background report is being released to the public and member Regional Councils to facilitate input to the SWISC planning process. The report documents current reduction, reuse and recycling initiatives in the GTA, identifies opportunities for coordination and collaboration among the GTA communities, and develops an action plan for improving the effectiveness of the reduction, reuse and recycling efforts within the GTA.

  1. LANS DB PENSION PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANS Contract LANS Contract Information Management and Operating Contract for the Los Alamos National Laboratory For confirmation of Official Contract Provisions, call: Dan Saiz, Contract Specialist, M&O Contract Support Division at (505) 845-4024. Get Adobe Reader You will need Adobe Acrobat to read many of the files on this site. If you haven't already done so, please download the free Adobe Reader

    December 2010 u:\my documents\pension plan\revised tcp1 db plan spd dec 2010.doc LANS

  2. Plutonium Vulnerability Management Plan

    SciTech Connect (OSTI)

    1995-03-01

    This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

  3. Guam Strategic Energy Plan

    SciTech Connect (OSTI)

    Conrad, M. D.

    2013-07-01

    Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

  4. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5-16 1 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  5. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    01-13 1 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  6. Performance expectation plan

    SciTech Connect (OSTI)

    Ray, P.E.

    1998-09-04

    This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.

  7. Environmental protection implementation plan

    SciTech Connect (OSTI)

    Holland, R.C.

    1998-03-01

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable.

  8. Mescalero Apache Strategic Energy Plan

    Broader source: Energy.gov [DOE]

    Example of a tribal community strategic energy plan developed by the Mescalero Apache. Source: Kabotie Consulting.

  9. Integrated Planning: Consolidating Annual Facility Planning - More Time for Execution

    SciTech Connect (OSTI)

    Nelson, J. G.; R., L. Morton; Ramirez, C.; Morris, P. S.; McSwain, J. T.

    2011-02-02

    Previously, annual planning for Readiness in Technical Base and Facilities (RTBF) at the Nevada National Security Site (NNSS) was fragmented, disconnected, circular, and occurred constantly throughout the fiscal year (FY) comprising 9 of the 12 months, reducing the focus on implementation and execution. This required constant “looking back” instead of “looking forward.” In FY 2009, annual planning was consolidated into one comprehensive integrated plan (IP) for each facility/project, which comprised annual task planning/outyear budgeting, AMPs, and investment planning (i.e., TYIP). In FY 2010, the Risk Management Plans were added to the IPs. The integrated planning process achieved the following: 1) Eliminated fragmented, circular, planning and moved the plan to be more forward-looking; 2) Achieved a 90% reduction in schedule planning timeframe from 40 weeks (9 months) to 6 weeks; 3) Achieved an 80% reduction in cost from just under $1.0M to just over $200K, for a cost savings of nearly $800K (reduced combined effort from over 200 person-weeks to less than 40); 4) Reduced the number of plans generated from 21 plans (1 per facility per plan) per year to 8 plans per year (1 per facility plus 1 program-level IP); 5) Eliminated redundancy in common content between plans and improved consistency and overall quality; 6) Reduced the preparation time and cost of the FY 2010 SEP by 50% due to information provided in the IP; 7) Met the requirements for annual task planning, annual maintenance planning, ten-year investment planning, and risk management plans.

  10. Program Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Publications » Program Plans Program Plans This page contains summaries of planned activities for DOE's Fuel Cell Technologies Office. The Department of Energy Hydrogen and Fuel Cells Program Plan outlines the strategy, activities, and plans of the DOE Hydrogen and Fuel Cells Program, which includes hydrogen and fuel cell activities within the EERE Fuel Cell Technologies Office and the DOE offices of Nuclear Energy, Fossil Energy, and Science. It describes the Program's activities, the specific

  11. Comprehensive facilities plan

    SciTech Connect (OSTI)

    1997-09-01

    The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitate existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.

  12. Occupant Emergency Plans

    Broader source: Energy.gov [DOE]

    The collection of Emergency Procedures documents for the Department of Energy, Headquarters buildings, in the Washington, DC, metropolitan area. All of these documents are only available to computers attached to the DOE Network. They are for use only by DOE Headquarters employees. • Building Diagrams and Assembly Areas • Occupant Emergency Plans (OEP's)

  13. Aerocapacitor commercialization plan

    SciTech Connect (OSTI)

    1995-09-12

    The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

  14. Planning cogeneration systems

    SciTech Connect (OSTI)

    Limaye, D.

    1984-01-01

    Major factors and considerations in the planning and evaluation of cogeneration systems are explained here. Coverage is provided of prefeasibility assessment, technical and economic feasibility evaluation, computerized systems design, cogeneration technologies and applications, and non-conventional technologies. Also discussed are fuel availability and price trends, financing and risk management in cogeneration projects, and practical considerations in cogeneration implementation.

  15. PNNL Campus Master Plan

    SciTech Connect (OSTI)

    Mosey, Whitney LC

    2012-09-07

    The Plan is used as a guide for PNNL in making facility and infrastructure decisions essential to supporting the PNNL vision: to establish a modern, collaborative, flexible, and sustainable campus while optimizing the efficiency of operations in support of courageous discovery and innovation.

  16. Designing a Benchmarking Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    U.S. Department of Energy Office of Energy Efficiency and Renewable Energy (EERE) Weatherization and Intergovernmental Program (WIP) Solution Center document about how state and local governments, Indian tribes, and overseas U.S. territories can design a plan to benchmark the energy consumption in public buildings.

  17. Plans, Implementation, and Results

    Broader source: Energy.gov [DOE]

    The Bioenergy Technologies Office carries out technology research, development, and deployment through an ongoing process of planning and analysis, implementation, and review. This Web page includes links to documents that support and document the program management process, and the results and public benefits that derive from it.

  18. WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL

    Office of Legacy Management (LM)

    WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community

  19. Involuntary Separation Plan Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plan Template Involuntary Separation Plan Template Attachment 6 - Involuntary Separation Plan Template_Rev1 (69.15 KB) More Documents & Publications Workforce Restructuring Policy General Workforce Restructuring Plan Template Self-Select Voluntary Separation Plan Template

  20. Section 999: Annual Plans | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    September 10, 2013 Draft 2014 Annual Plan Section 999: Draft 2014 Annual Plan July 8, 2013 2013 Annual Plan Section 999: 2013 Annual Plan August 3, 2012 2012 Annual Plan Section ...

  1. Hydrogen Posture Plan: An Integrated Research, Development and Demonstration Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The 2006 Hydrogen Posture Plan satisfies Section 804 of the Energy Policy Act of 2005, which requires that the Secretary of Energy transmit to Congress a coordinated plan for the Department’s hydrogen and fuel cell programs.

  2. SAVEnergy Action Plans

    SciTech Connect (OSTI)

    Mayo, K.; Westby, R.; deMonsabert, S.; Ginsberg, M.

    1994-04-01

    The Department of Energy`s Federal Energy Management Program (FEMP) is charged with carrying out key sections of EPACT and Executive Order 12903, to make the Federal government operate more efficiently. A congressionally mandated energy and water conservation audit program is one component of this growing DOE program. This paper traces the SAVEnergy Action Plan program throughout its development from (1) identifying projects and Agency champions, (2) establishing a protocol and fitting auditors into the program, (3) developing a data base to track the audits and measure their success, and (4) evaluating the process, learning from mistakes, and charting and transferring successes. A major tenet of the SAVEnergy program is to proactively prescreen all audit activities to ensure that -- where audits are done and Action Plans completed -- projects will be done.

  3. CIPS Validation Data Plan

    SciTech Connect (OSTI)

    Nam Dinh

    2012-03-01

    This report documents analysis, findings and recommendations resulted from a task 'CIPS Validation Data Plan (VDP)' formulated as an POR4 activity in the CASL VUQ Focus Area (FA), to develop a Validation Data Plan (VDP) for Crud-Induced Power Shift (CIPS) challenge problem, and provide guidance for the CIPS VDP implementation. The main reason and motivation for this task to be carried at this time in the VUQ FA is to bring together (i) knowledge of modern view and capability in VUQ, (ii) knowledge of physical processes that govern the CIPS, and (iii) knowledge of codes, models, and data available, used, potentially accessible, and/or being developed in CASL for CIPS prediction, to devise a practical VDP that effectively supports the CASL's mission in CIPS applications.

  4. Guam Energy Action Plan

    SciTech Connect (OSTI)

    Conrad, M. D.; Ness, J. E.

    2013-07-01

    Describes the four near-term strategies selected by the Guam Energy Task Force during action planning workshops conducted in March 2013, and outlines the steps being taken to implement those strategies. Each strategy addresses one of the energy sectors identified in the earlier Guam strategic energy plan as being an essential component of diversifying Guam's fuel sources and reducing fossil energy consumption 20% by 2020. The four energy strategies selected are: (1) expanding public outreach on energy efficiency and conservation, (2) establishing a demand-side management revolving loan program, (3) exploring waste-to-energy options, and (4) influencing the transportation sector via anti-idling legislation, vehicle registration fees, and electric vehicles.

  5. Hydrogen Posture Plan: An Integrated Research, Development and Demonstration Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    . December 2006 Hydrogen Hydrogen P P osture osture Plan Plan An An Integrated Integrated R R esearch, esearch, Development Development and and Demonstration Demonstration Plan Plan United States Department of Energy United States Department of Transportation A National Commitment In his 2003 State of the Union address, President Bush announced a hydrogen initiative to reverse America's growing dependence on foreign oil and improve the environment. The President urged the development of

  6. Plan Your Visit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Visit Plan your visit to the museum Experience 40 interactive exhibits revealing nuclear defense history and the research in life sciences, material sciences, space, supercomputing, energy and the environment. August 18, 2014 Visitor in an interactive exhibit Contact Us thumbnail of Tu - Sat: 10 - 5 PM Su & Mon: 1 - 5 PM Free Admission Bradbury Science Museum, 1350 Central Avenue Tu - Sat: 10 - 5 PM Su & Mon: 1 - 5 PM Free Admission Open every day except Thanksgiving, Christmas, and New

  7. PROJECT MANGEMENT PLAN EXAMPLES

    Office of Environmental Management (EM)

    End Point Closeout Examples Example 77 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field

  8. SNL Community Relations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    RESOURCE CONSERVATION AND RECOVERY ACT FACILITY OPERATING PERMIT COMMUNITY RELATIONS PLAN SANDIA NATIONAL LABORATORIES, NEW MEXICO AUGUST 2015 United States Department of Energy National Nuclear Security Administration Sandia Field Office Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract

  9. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    COMBUSTION SYSTEMS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that

  10. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CARBON CAPTURE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its

  11. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents

  12. TECHNOLOGY PROGRAM PLAN

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    TURBINES U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use

  13. Future land use plan

    SciTech Connect (OSTI)

    1995-08-31

    The US Department of Energy`s (DOE) changing mission, coupled with the need to apply appropriate cleanup standards for current and future environmental restoration, prompted the need for a process to determine preferred Future Land Uses for DOE-owned sites. DOE began the ``Future Land Use`` initiative in 1994 to ensure that its cleanup efforts reflect the surrounding communities` interests in future land use. This plan presents the results of a study of stakeholder-preferred future land uses for the Brookhaven National Laboratory (BNL), located in central Long Island, New York. The plan gives the Laboratory`s view of its future development over the next 20 years, as well as land uses preferred by the community were BNL ever to cease operations as a national laboratory (the post-BNL scenario). The plan provides an overview of the physical features of the site including its history, topography, geology/hydrogeology, biological inventory, floodplains, wetlands, climate, and atmosphere. Utility systems and current environmental operations are described including waste management, waste water treatment, hazardous waste management, refuse disposal and ground water management. To complement the physical descriptions of the site, demographics are discussed, including overviews of the surrounding areas, laboratory population, and economic and non-economic impacts.

  14. Project Management Plan

    SciTech Connect (OSTI)

    Not Available

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs.

  15. TRUPACT-1 implementation plan

    SciTech Connect (OSTI)

    Hurley, J.D.; Tappen, J.J. . Joint Integration Office); Christensen, D.S. )

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  16. Peru-Planning for Climate Change (PlanCC) | Open Energy Information

    Open Energy Info (EERE)

    Peru-Planning for Climate Change (PlanCC) (Redirected from Planning for Climate Change (PlanCC) Peru) Jump to: navigation, search Logo: Planning for Climate Change (PlanCC) Peru...

  17. Unvented Drum Handling Plan

    SciTech Connect (OSTI)

    MCDONALD, K.M.

    2000-08-01

    This drum-handling plan proposes a method to deal with unvented transuranic drums encountered during retrieval of drums. Finding unvented drums during retrieval activities was expected, as identified in the Transuranic (TRU) Phase I Retrieval Plan (HNF-4781). However, significant numbers of unvented drums were not expected until excavation of buried drums began. This plan represents accelerated planning for management of unvented drums. A plan is proposed that manages unvented drums differently based on three categories. The first category of drums is any that visually appear to be pressurized. These will be vented immediately, using either the Hanford Fire Department Hazardous Materials (Haz. Mat.) team, if such are encountered before the facilities' capabilities are established, or using internal capabilities, once established. To date, no drums have been retrieved that showed signs of pressurization. The second category consists of drums that contain a minimal amount of Pu isotopes. This minimal amount is typically less than 1 gram of Pu, but may be waste-stream dependent. Drums in this category are assayed to determine if they are low-level waste (LLW). LLW drums are typically disposed of without venting. Any unvented drums that assay as TRU will be staged for a future venting campaign, using appropriate safety precautions in their handling. The third category of drums is those for which records show larger amounts of Pu isotopes (typically greater than or equal to 1 gram of Pu). These are assumed to be TRU and are not assayed at this point, but are staged for a future venting campaign. Any of these drums that do not have a visible venting device will be staged awaiting venting, and will be managed under appropriate controls, including covering the drums to protect from direct solar exposure, minimizing of container movement, and placement of a barrier to restrict vehicle access. There are a number of equipment options available to perform the venting. The

  18. Preferred Provider Organization (PPO) Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Preferred Provider Organization (PPO) Plan for non-Medicare retirees is a medical insurance plan with a lower deductible but higher premium than the 2016 High-Deductible Health...

  19. OpenEI Community - planning

    Open Energy Info (EERE)

    coming soon

    http:en.openei.orgcommunityblogdetailed-planning-kickscomments planning Linked Open Data Workshop in Washington, D.C. Thu, 27 Sep 2012 13:53:37 +0000 Jweers...

  20. Strategic Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is divided into two main phases. In the scientific plan phase we developed a new vision for our scientific and technology research. Plans for focus areas have been developed...

  1. Accidental Death & Dismemberment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Accidental Death & Dismemberment Plan Accidental Death & Dismemberment Plan A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Accidental Death & Dismemberment Plan Accidental Death and Dismemberment (AD&D) insurance protects you and your family from the unforeseen financial hardship of an accident that causes death, dismemberment, paralysis, or loss of

  2. Planning | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    planning and training to counter both domestic and international nuclear terrorism. ... PROGRAMMATIC ("ongoing" activities) Program Administration Training and Drills Exercises ...

  3. Storm Water Pollution Prevention Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ANL-1520 Storm Water Pollution Prevention Plan Argonne National Laboratory FY 2015 ...... Peter L. Lynch Water Pollution Control Specialist FMS - ...

  4. STRIPES New Milestone Plan Process

    Broader source: Energy.gov [DOE]

    A new Milestone Plan process has been implemented in STRIPES. Creating a Milestone Plan document and linking it to a requisition or award is no longer a system requirement. Instead, four fields have been added to the Main | Additional pages of all award documents (except P-Card Orders). These fields will be used to capture the PALT data required by management and will replace the function previously performed by the Milestone Plan. (See the attached Milestone Plan Process Improvement Reference Guide.)

  5. Clean Energy Business Plan Competition

    ScienceCinema (OSTI)

    Maxted, Sara Jane; Lojewski, Brandon; Scherson, Yaniv;

    2013-05-29

    Top Students Pitch Clean Energy Business Plans The six regional finalists of the National Clean Energy Business Plan Competition pitched their business plans to a panel of judges June 13 in Washington, D.C. The expert judges announced NuMat Technologies from Northwestern University as the grand prize winner.

  6. Clean Energy Business Plan Competition

    SciTech Connect (OSTI)

    Maxted, Sara Jane; Lojewski, Brandon; Scherson, Yaniv

    2012-01-01

    Top Students Pitch Clean Energy Business Plans The six regional finalists of the National Clean Energy Business Plan Competition pitched their business plans to a panel of judges June 13 in Washington, D.C. The expert judges announced NuMat Technologies from Northwestern University as the grand prize winner.

  7. CESP Planning Timeline Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning Timeline Template CESP Planning Timeline Template Tool 0.1: CESP Planning Timeline Template in the Guide to Community Energy Strategic Planning. CESP Planning Timeline Template (11.68 KB) More Documents & Publications Tool 0.1: CESP Planning Worksheet CESP Tool 2.2: Stakeholder Invite Guide to Community Energy Strategic Planning

  8. ESnet Program Plan 1994

    SciTech Connect (OSTI)

    Merola, S.

    1994-11-01

    This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

  9. Integrated rural energy planning

    SciTech Connect (OSTI)

    El Mahgary, Y.; Biswas, A.K.

    1985-01-01

    This book presents papers on integrated community energy systems in developing countries. Topics considered include an integrated rural energy system in Sri Lanka, rural energy systems in Indonesia, integrated rural food-energy systems and technology diffusion in India, bringing energy to the rural sector in the Philippines, the development of a new energy village in China, the Niaga Wolof experimental rural energy center, designing a model rural energy system for Nigeria, the Basaisa village integrated field project, a rural energy project in Tanzania, rural energy development in Columbia, and guidelines for the planning, development and operation of integrated rural energy projects.

  10. Proj. Plan Example SEM

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    (DOE) CUSTOMER INFORMATION TECHNOLOGY (IT) SUPPORT SYSTEM (CITSS) Project Plan December 1997 U. S. DEPARTMENT OF ENERGY Office of the Chief Information Officer and Headquarters Collaboration Group Change Control Page The change control page will be used to record information for controlling and tracking modifications made to this document. Revision Date: 12/15/97 Author: Brian Field a. Section(s): 2.3 Page Number(s): 2-2 through 2-4 Summary of Change(s): Updated roles and responsibilities chart

  11. LASIC Science Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    7 Layered Atlantic Smoke Interactions with Clouds (LASIC) Science Plan P Zuidema MJ Alvarado C Chiu SP DeSzoeke CW Fairall G Feingold SJ Ghan JM Haywood P Kollias ER Lewis GM McFarguhar A McComiskey DB Mechem J Redemann DM Romps DD Turner H Wang R Wood SE Yuter P Zhu March 2016 DISCLAIMER This report was prepared as an account of work sponsored by the U.S. Government. Neither the United States nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes

  12. 2007 Strategic Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    U.S. Department of Energy Office of Legacy Management Office of Legacy Management Strategic Plan O r g a n i z a t i o n O r g a n i z a t i o n A H i g h Perfo r m i n g A H i g h Perfo r m i n g HPO Managing Today's Change, Protecting Tomorrow's Future Managing Today's Change, Protecting Tomorrow's Future DOE/LM-1458 Cover, left to right, top to bottom: The Environmental Justice program affords learning opportunities for interns at an U.S. Department of Energy national laboratory. A records

  13. FY16-FY20 Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... Performance Evaluation Measurement Plan (PEMP), which is aligned with our strategic plan. ... Vision, as well as with Sandia's Strategic Performance Evaluation Measurement Plan (PEMP). ...

  14. Best Management Practice #1: Water Management Planning

    Office of Energy Efficiency and Renewable Energy (EERE)

    A successful water management program starts with developing a comprehensive water management plan. This plan should be included within existing facility operating plans.

  15. Strategic Planning Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Planning Overview Strategic Planning Overview BETO Strategic Planning Overview July 2013 programmanagementreview2013strategicplanningeng.pdf (1.29 MB) More Documents ...

  16. Plans and Reports | Department of Energy

    Office of Environmental Management (EM)

    Plans and Reports Plans and Reports The U.S. Department of Energy (DOE) Sustainability Performance Office (SPO) tracks, plans, and reports progress on sustainability metrics set by...

  17. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    A, Interconnection-Level Analysis and Planning Interconnection-Wide Transmission Planning Initiative: Topic A, Interconnection-Level Analysis and Planning A description of the ...

  18. Marketing and Communications Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Communications Plan Marketing and Communications Plan This is a document from Energy ... PDF icon Marketing and Communications Plan More Documents & Publications Sonoma County ...

  19. Project Management Plan Examples | Department of Energy

    Office of Environmental Management (EM)

    Examples Project Management Plan Examples Examples From Project Management Plans The following material has been extracted from several project management plans. The order in which ...

  20. Program Planning Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Planning Guide Program Planning Guide SEP program planning guide.pdf More Documents & Publications SEP Presentations Materials SEP Toolkit Overview The Cummins Rocky Mount...

  1. EERE Digital Data Management Planning Requirements | Department...

    Broader source: Energy.gov (indexed) [DOE]

    To integrate data management planning into an overall research plan, the following ... All projects selected for EERE research funding must include a data management plan (DMP) ...

  2. Annual Planning Summaries: 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Annual Planning Summaries: 2013 March 25, 2013 2013 Annual Planning Summary for the ... March 25, 2013 2013 Annual Planning Summary for the Pacific Northwest Site Office The ...

  3. Strategic plan for infrastructure optimization

    SciTech Connect (OSTI)

    Donley, C.D.

    1998-05-27

    This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructure and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.

  4. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-09-30

    In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

  5. NIF Title III engineering plan

    SciTech Connect (OSTI)

    Deis, G

    1998-06-01

    The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

  6. Production Planning Model

    Energy Science and Technology Software Center (OSTI)

    1998-04-20

    PRODMOD is an integrated computational tool for performing dynamic simulation and optimization for the entire high level waste complex at the Savannah River Site (SRS) It is being used at SRS for planning purposes so that all waste can be processed efficiently. The computational tool 1) optimizes waste blending sequences, 2) minimizes waste volume production, 3) reduces waste processing time, 4) provides better process control and understanding, and 5) assists strategic planning, scheduling, and costmore » estimation. PRODMOD has been developed using Aspen Technology''s software development package SPEEDUP. PRODMOD models all the key HLW processing operations at SRS: storage and evaporation: saltcake production and dissolution: filtration (dewatering): precipitation: sludge and precipitate washing: glass, grout, and organics production. Innovative approaches have been used in making PRODMOD a very fast computational tool. These innovative approaches are 1) constructing a dynamic problem as a steady state problem 2) mapping between event-space (batch processes) and time-space (dynamic processes) without sacrificing the details in the batch process. The dynamic nature of the problem is constructed in linear form where time dependence is implicit. The linear constructs and mapping algorithms have made it possible to devise a general purpose optimization scheme which couples the optimization driver with the PRODMOD simulator. The optimization scheme is capable of generating single or multiple optimal input conditions for different types of objective functions over single or multiple years of operations depending on the nature of the objective function and operating constraints.« less

  7. Environmental Management System Plan

    SciTech Connect (OSTI)

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  8. Institutional Plan FY 2003 - 2007

    SciTech Connect (OSTI)

    Chartock, Michael; Hansen, Todd

    2003-01-27

    The Fiscal Year (FY) 2003-2007 Institutional Plan describes the strategic directions and key issues that Lawrence Berkeley National Laboratory management must address with the Department of Energy (DOE) in charting its future as a multiprogram national laboratory. The Plan provides an overview of the Laboratory's mission, strategic plan, initiatives, and the resources required to fulfill its role in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Plan facilitates the Department of Energy's ongoing efforts to strengthen the Integrated Laboratory System. Preparation and review of the Institutional Plan is one element of the Department of Energy's strategic management planning activities, implemented through an annual planning process. The Plan supports the President's Management Agenda and the Government Performance and Results Act of 1993. The Plan complements the current performance-based contract between the Department of Energy and the Regents of the University of California, and summarizes Best Management Practices for a potential future results-based contract as a basis for achieving DOE goals and the Laboratory's scientific and operations objectives. It identifies technical and administrative directions in the context of national energy policy and research needs and the Department of Energy's program planning initiatives. Preparation of the Plan is coordinated by the Planning and Strategic Development Office from information contributed by Berkeley Lab's scientific and support divisions and DOE comments on prior years' plans. The Laboratory Mission section identifies the specific strengths of Berkeley Lab that contribute to the mission in general and the Integrated Laboratory System in particular. The Laboratory Strategic Plan section identifies the existing activities in support of DOE Office of Science and other sponsors; support for DOE goals; and the Laboratory Scientific Vision and

  9. Planning for Energy Development: Strategic Energy Planning REnewable...

    Broader source: Energy.gov (indexed) [DOE]

    November 18, 2011 Strategic Energy Planning Renewable Energy Demonstration Center Concept ... sources Could a Renewable Energy Demonstration Center (REDC) attract renewable energy ...

  10. Graphite Technology Development Plan

    SciTech Connect (OSTI)

    W. Windes; T. Burchell; M.Carroll

    2010-10-01

    The Next Generation Nuclear Plant (NGNP) will be a helium-cooled High Temperature Gas Reactor (HTGR) with a large graphite core. Graphite physically contains the fuel and comprises the majority of the core volume. Graphite has been used effectively as a structural and moderator material in both research and commercial high-temperature gas-cooled reactors. This development has resulted in graphite being established as a viable structural material for HTGRs. While the general characteristics necessary for producing nuclear grade graphite are understood, historical nuclear grades no longer exist. New grades must be fabricated, characterized, and irradiated to demonstrate that current grades of graphite exhibit acceptable non-irradiated and irradiated properties upon which the thermomechanical design of the structural graphite in NGNP is based. This Technology Development Plan outlines the research and development (R&D) activities and associated rationale necessary to qualify nuclear grade graphite for use within the NGNP reactor.

  11. GEND planning report

    SciTech Connect (OSTI)

    1980-10-01

    The Three Mile Island (TMI) Unit 2 accident on March 28, 1979 was and is of great concern to the nuclear industry; electric power generating companies and their customers, regulatory and other government agencies, the entire nuclear community, and to the country as a whole. While the accident resulted in only limited external plant radiation exposure, the plant itself suffered extensive damage with high radiation contamination within the reactor and auxiliary system facilities. The GEND Planning Report for cleanup activities at TMI-2 covers the areas of: instrumentation and electrical equipment survivability; fission product transport; decontamination/radiation dose reduction technology; data bank organization and sample archive facility; characterization of primary system pressure boundary and mechanical components; core damage assessment; and fuel handling, removal, examination and disposal.

  12. Mitigation Action Plan

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This Mitigation Action Plan (MAP) focuses on mitigation commitments stated in the Supplemental Environmental Impact Statement (SEIS) and the Record of Decision (ROD) for the Naval Petroleum Reserve No. 1 (NPR-1). Specific commitments and mitigation implementation actions are listed in Appendix A-Mitigation Actions, and form the central focus of this MAP. They will be updated as needed to allow for organizational, regulatory, or policy changes. It is the intent of DOE to comply with all applicable federal, state, and local environmental, safety, and health laws and regulations. Eighty-six specific commitments were identified in the SEIS and associated ROD which pertain to continued operation of NPR-1 with petroleum production at the Maximum Efficient Rate (MER). The mitigation measures proposed are expected to reduce impacts as much as feasible, however, as experience is gained in actual implementation of these measures, some changes may be warranted.

  13. A reservoir management plan

    SciTech Connect (OSTI)

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  14. National Highway Planning Network

    Energy Science and Technology Software Center (OSTI)

    1992-02-02

    NHPN, the National Highway Planning Network, is a database of major highways in the continental United States that is used for national-level analyses of highway transportation issues that require use of a network, such as studies of highway performance, network design, social and environmental impacts of transportation, vehicle routing and scheduling, and mapping. The network is based on a set of roadways digitized by the U. S. Geological Survey (USGS) from the 1980 National Atlasmore » and has been enhanced with additional roads, attribute detail, and topological error corrections to produce a true analytic network. All data have been derived from or checked against information obtained from state and Federal governmental agencies. Two files comprise this network: one describing links and the other nodes. This release, NHPN1.0, contains 44,960 links and 28,512 nodes representing approximately 380,000 miles of roadway.« less

  15. Recommendations: 2007 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Annual Plan Recommendations: 2007 Annual Plan URTAC Recommendations: Section 999 2007 Annual Plan (296.41 KB) More Documents & Publications Recommendations: 2008 Annual Plan URTAC Meeting - March 4, 2008 URTAC Meeting - July 2007

  16. Recommendations: 2008 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Annual Plan Recommendations: 2008 Annual Plan URTAC Recommendations: 2008 Annual Plan (803.44 KB) More Documents & Publications Recommendations: 2007 Annual Plan URTAC Meeting - March 4, 2008 URTAC Meeting - October 13, 2010

  17. DOE Vendor Communications Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vendor Communications Plan DOE Vendor Communications Plan Vendor Communication Plan.pdf (172.98 KB) More Documents & Publications DOE Vendor Communication Plan Improving Communication with Industry during the Acquisition Process MEMORANDUM FOR CHIEF ACQUISITION OFFICERS

  18. Ames Laboratory Emergency Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Ames Laboratory Emergency Plan Version Number: 14.0 Document Number: Plan 46300.001 Effective Date: 04/2016 File (public): PDF icon Plan 46300.001 Rev14 Emergency Plan

  19. Audit Implementation Design Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Audit Implementation Design Plan Document Number: NA Effective Date: 08

  20. 2010 Audit Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10 Audit Plan Document Number: NA Effective Date: 06

  1. 2016 Audit Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    6 Audit Plan Document Number: NA Effective Date: 12

  2. Resource Planning Guide

    Energy Science and Technology Software Center (OSTI)

    1994-06-30

    RPG1.06 is an (IRP) tool developed so that small public utilities would have a tool to complete an IRP that was in compliance with the Energy Policy Act of 1992. RPG1.06 is divided into three levels: Fast Track, Intermediate, and Detailed. Each level is designed to be completed independently. The Fast Track level is designed for users who want to complete a quick, simple planning study to identify applicable resource options. The Intermediate level ismore » designed for users who want to add their own data and apply weighting factors to the results after completing a quick, simple planning study. The Detailed level is designed for users who want to identify applicable resource options and spend a fair amount of time collecting the data, computing the calculations, and compiling the results. The Detailed level contains a production costing module and optimization algorithms. The software contains the worksheets that appear in the workbook version. Similar to the workbooks, the software worksheets are designed to be completed in numerical order. The software automatically saves the data entered into a worksheet, and carries the data from worksheet to worksheet, completing all calculations. RPG1.06 also contains three additional volumes. Getting Started is an introduction to RPG1.06. Getting Started helps the user understand the differences between the three workbooks and choose the workbook that best fits the users needs. Reference Data contains supply, demand, end-use, weather, and survey data that can be used in lieu of a utility''s own data. Reference Data is particulary helpful for a utility that does not have the time, staff, or money to gather all its own data. The Sample Load Forecasting Methodologies details the steps necessary to complete simple trends, end-use, and economic load forecasts.« less

  3. Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Althouse, P E; Bertoldo, N A; Bowen, B M; Brown, R A; Campbell, C G; Christofferson, E; Gallegos, G M; Grayson, A R; Jones, H E; Larson, J M; Laycak, D; Mathews, S; Peterson, S R; Revelli, M J; Rueppel, D; Williams, R A; Wilson, K; Woods, N

    2005-11-23

    The purpose of the environmental monitoring plan (EMP) is to promote the early identification of, and response to, potential adverse environmental impacts associated with DOE operations. Environmental monitoring supports the Integrated Safety Management System (ISMS) to detect, characterize, and respond to releases from DOE activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of the DOE activity. In addition, the EMP addresses the analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of radionuclide samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. Until recently, environmental monitoring at Lawrence Livermore National Laboratory (LLNL) was required by DOE Order 5400.1, which was canceled in January 2003. LLNL is in the process of adopting the ISO 14001 Environmental Management Systems standard, which contains requirements to perform and document environmental monitoring. The ISO 14001 standard is not as prescriptive as DOE Order 5400.1, which expressly required an EMP. LLNL will continue to prepare the EMP because it provides an organizational framework for ensuring that the work is conducted appropriately. The environmental monitoring addressed by the plan includes preoperational characterization and assessment, and effluent and surveillance monitoring. Additional environmental monitoring is conducted at LLNL as part of the compliance with the

  4. Ten Year Site Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ten Year Site Plans Ten Year Site Plans A Ten Year Site Plan (TYSP) is the essential planning document linking a site's real property requirements to its mission in support of the Department of Energy's overall strategic plan. It is a comprehensive site-wide plan encompassing the needs of tenant activities. The TYSP is integral to and supports the Department's Planning, Programming, Budgeting, and Evaluation System (PPBES). The TYSP also describes site-specific actions the programs plans in

  5. Space Conditioning Standing Technical Committee Strategic Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Committee Strategic Plan Space Conditioning Standing Technical Committee Strategic Plan ... identified by the Building America Space Conditioning Standing Technical Committee. ...

  6. Heating National Ignition Facility, Realistic Financial Planning...

    Office of Environmental Management (EM)

    National Ignition Facility, Realistic Financial Planning & Rapid Modification Lessons Learned Report Apr 2010 Heating National Ignition Facility, Realistic Financial Planning &...

  7. Budget Performance Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Performance Planning Budget Performance Planning The Office of Budget assists with planning by providing guidance such as the Office of Energy Efficiency and Renewable Energy (EERE) Guidance for Multiyear Program Planning. EERE Guidance for Multiyear Program Planning: Phase II Guidance The Multiyear Program Plan (MYPP) Template provides guidance to EERE programs on developing effective program plans. It provides a general framework for multiyear planning, and includes the rationale for the

  8. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk-based retrieval, IM updatediscussion LAWPSCesium, IM updatediscussion WTP Communication Plan, IM updatediscussion TVAT Implementation Plan Update HOLDING BIN...

  9. CITSS Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    CITSS Project Plan CITSS Project Plan The Customer Information Technology Support System (CITSS) Training Plan, from an actual DOE Commercial Off-The-Shelf (COTS) software integration project, can be used as a template to facilitate the creation of the training plan for your particular project. CITSS Project Plan (49.2 KB) More Documents & Publications CITSS Project Plan Software Configuration Management Plan Training Plan

  10. Hoisting & Rigging Lift Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hoisting & Rigging Lift Plan Stanford Synchrotron Radiation Laboratory May 16, 2005 SSRL-HRLP-000-R0 Page 1 of 3 General Information Lift Plan Document # Plan prepared by: Describe the load or items to be lifted: Could the load, if dropped, release hazardous materials or radioactivity? No Yes (describe) Is the load irreplaceable or would it be very costly to replace if damaged? No Yes (describe) Brief description of lift activities (specify if rolling or flipping involved) Equipment

  11. Strategic Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Plan Strategic Plan Strategic Plan A modern, reliable, secure, affordable and environmentally sensitive national energy infrastructure is fundamental to our quality of life and energy future. Yet since 1982, growth in peak demand for electricity has exceeded the growth and development of our electric grid. This demand growth will continue due to a growing population; larger homes with burgeoning IT requirements and more elaborate appliances; and the growth of electric vehicles; as well

  12. Strategic Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Residential Buildings » Building America » Strategic Plans Strategic Plans The strategic planning process charts the course for the U.S. Department of Energy (DOE) Building America program's efforts to widely deploy new integrated packages of energy-saving measures in new and existing homes. These living documents give an overview of Building America's research approach to evaluate specific building system options for reliability, cost-effectiveness, and marketability. Here you can learn more

  13. Conduct of operations implementation plan

    SciTech Connect (OSTI)

    Anderson, C.K.; Hall, R.L.

    1991-02-20

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  14. Karuk Tribe Strategic Energy Planning

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Karuk Tribe Strategic Energy Planning Journey To Success? The 5 P's of Success #1 - Partners Local utility company #2 - Politics! Community Development or Natural Resources? #3 - Plan Do you have one already? What are all of those acronyms? # 4 - Place Reservation Fee status land # 5 - Pfunding Where do we start? In Conclusion * Nothing happens fast! * As you move forward there will be more questions * Having a plan is critical to success * Never be afraid to ask for help * Utilize your partners

  15. 2013 Community Commitment plan approved

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Community Commitment Plan Approved Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue: September 1, 2016 all issues All Issues » submit 2013 Community Commitment plan approved The plan provides funding from LANS' management fee to invest in regional education, economic development, and charitable giving programs. October 1, 2012 dummy image Read our archives Contacts Editor Linda Anderman Email Community Programs Office Kurt Steinhaus

  16. Benefits Plan Reports & Notices

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Benefits Plan Reports & Notices Benefits Plan Reports & Notices Employees and retirees are the building blocks of the Lab's success. Our employees get to contribute to the most pressing issues facing the nation.Retiree health and welfare benefits are managed by AonHewitt and Associates. Contact Benefits Office As an employer offering ERISA compliant benefit plans, LANS is required to provide notices and reports to employees throughout the course of the year. Generally, the reports are

  17. Recommendations: 2009 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    9 Annual Plan Recommendations: 2009 Annual Plan URTAC - Recommendations on 2009 Section 999 Annual Plan (4.17 MB) More Documents & Publications Recommendations: Draft 2009 Section 999 Annual Plan Recommendations: 2010 Annual Plan Recommendations: Draft 2010 Section 999 Annual Plan

  18. Recommendations: 2011 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Annual Plan Recommendations: 2011 Annual Plan URTAC - Recommendations on 2011 Section 999 Annual Plan URTAC Recommendations on 2011 Section 999 Annual Plan (594.7 KB) More Documents & Publications URTAC Meeting - December 18, 2013 Recommendations: 2010 Annual Plan Recommendations: Draft 2012 Annual Plan

  19. Project Management Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Management Plans Project Management Plans The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Project Management Plans (353.99 KB) More Documents & Publications Project Management Plan Examples Project Management Plan Examples 1 - 80 Deactivation Management

  20. 2008 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    8 Annual Plan 2008 Annual Plan Section 999: 2008 Annual Plan (15.58 MB) More Documents & Publications 2007 Annual Plan for the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2007 Annual Plan Recommendations: Draft 2008 Section 999 Annual Plan

  1. 2013 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    13 Annual Plan 2013 Annual Plan Ultra-Deepwater and Uncoventional Natural Gas and Other Petroleum Resources Research and Development Program Report to Congress, June 2013 Section 999: 2013 Annual Plan (6.52 MB) More Documents & Publications 2011 Annual Plan Draft 2014 Annual Plan Sec. 999 Annual Plan 2012

  2. 2009 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan 2009 Annual Plan Section 999: 2009 Annual Plan (2.11 MB) More Documents & Publications 2009 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2010 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2010 Annual Plan

  3. 2010 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan 2010 Annual Plan Section 999: 2010 Annual Plan (4.38 MB) More Documents & Publications 2010 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2009 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program 2009 Annual Plan

  4. Emergency Readiness Assurance Plans (ERAPs)

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-08-21

    This volume describes the assessments and documentation that would ensure that stated response capabilities are sufficient to implement emergency plans. Canceled by DOE G 151.1-3.

  5. EPA Clean Power Plan Seminar

    Broader source: Energy.gov [DOE]

    The U.S. Environmental Protection Agency (EPA) is hosting an informational seminar addressing the opportunities and challenges presented by EPA's Clean Power Plan.

  6. Integrated Planning and Performance Management

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Process Maintain Lab Agenda Prepare ALP Program Execution Plan PEMP PreparationApproval POG Support CAS M-3 Implementation FNAL Enterprise Risk Management...

  7. Update on Franklin retirement plans

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Update on Franklin retirement plans Update on Franklin retirement plans February 21, 2012 by Helen He NERSC is making progress on plans to acquire our next major system. Franklin's retirement is necessary to prepare the machine room for the new system. At this point in our planning we can say that Franklin will retire no sooner than April 30. Additional announcements will be made with more details when a firm date is set. If you are currently only using Franklin you should start migrating to

  8. ISTStrategicPlanFinal.indd

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Science at Matters: Integrating Information, Science, and Technology for Prediction Strategic Plan December 2010 Predicting Materials Behavior Situational Awareness Energy Climate...

  9. University of Kansas: Business Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of remote customer's power costs and power quality problems. ... energy need in remote areas and emergency situations. ... better health, family planning, and education services, ...

  10. Performance Evaluation and Measurement Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... including those problems identified in the risk management process, is necessary. ... Central Plateau; for example, port of entry, access control, emergency planning zones, etc. ...

  11. Performance Measurement Plans - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CH2M Contract CH2M Contract Modifications WAI Contract WAI Contract Mods Performance Measurement Plans Email Email Page | Print Print Page |Text Increase Font Size Decrease...

  12. Archive: LANL Community Commitment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Archive: LANL Community Commitment Plan Our good neighbor pledge: to contribute to quality of life in Northern New Mexico through economic development, excellence in...

  13. Final Draft Strategic Marketing Plan.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-02-01

    The Bonneville Power Administration (BPA) has developed a marketing plan to define how BPA can be viable and competitive in the future, a result important to BPA`s customers and constituents. The Marketing Plan represents the preferred customer outcomes, marketplace achievements, and competitive advantage required to accomplish the Vision and the Strategic Business Objectives of the agency. The Marketing Plan contributes to successful implementation of BPA`s Strategic Business Objectives (SBOs) by providing common guidance to organizations and activities throughout the agency responsible for (1) planning, constructing, operating, and maintaining the Federal Columbia River Power System; (2) conducting business with BPA`s customers; and (3) providing required internal support services.

  14. FY 1989 Annual Operating Plan

    SciTech Connect (OSTI)

    1988-12-01

    This is an internal DOE Geothermal Program planning and control document. Many of these reports were issued only in draft form. (DJE 2005)

  15. ARM - SPARTICUS Planning - Data Plots

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Measurements SGP Data Plots NASA Data Plots ARM Data Discovery Browse Data Experiment Planning SPARTICUS Proposal Abstract Science Questions Science and Operations (PDF, 1.01M)...

  16. Programs Planning to Do Evaluations

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Data and Evaluation Peer Exchange Call: Programs Planning to Do Evaluations, Call Slides and Discussion Summary, August 2, 2012.

  17. EPA The Clean Power Plan

    Office of Environmental Management (EM)

    This means carbon and air pollution are already decreasing, improving public health each and every year. The Clean Power Plan 7 Overview * Sets carbon dioxide emissions performance ...

  18. Environmental Monitoring Plan

    SciTech Connect (OSTI)

    Althouse, P E; Biermann, A; Brigdon, S L; Brown, R A; Campbell, C G; Christofferson, E; Clark, L M; Folks, K J; Gallegos, G M; Gouveia, F J; Grayson, A; Harrach, R J; Hoppes, W G; Jones, H; Mathews, S; Merrigan, J R; Peterson, S R; Revelli, M; Rueppel, D; Sanchez, L; Tate, P J; Vellinger, R J; Ward, B; Williams, R

    2006-01-10

    Environmental monitoring personnel from Lawrence Livermore National Laboratory (LLNL) prepared this ''Environmental Monitoring Plan'' (EMP) to meet the requirements in the U.S. Department of Energy (DOE) ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' (DOE 1991) and applicable portions of DOE Orders 5400.1 and 5400.5 (see WSS B93 and B94 in Appendix B). ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' is followed as a best management practice; under Work Smart Standards, LLNL complies with portions of DOE Orders 5400.1 and 5400.5 as shown in Appendix B. This document is a revision of the May 1999 EMP (Tate et al. 1999) and is current as of March 1, 2002. LLNL is one of the nation's premier applied-science national security laboratories. Its primary mission is to ensure that the nation's nuclear weapons remain safe, secure, and reliable, and to prevent the spread and use of nuclear weapons worldwide. LLNL's programs in advanced technologies, energy, environment, biosciences, and basic science apply LLNL's unique capabilities and enhance the competencies needed for this national security mission. LLNL's mission also involves working with industrial and academic partners to increase national competitiveness and improve science education. LLNL's mission is dynamic and has changed over the years to meet new national needs. In keeping with the Laboratory's mission, the environment, safety, and health (ES&H) have top priority. LLNL's policy is to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage. The environment, safety, and health are to be priority considerations in the planning and execution of all work activities at the Laboratory (LLNL 2001). Furthermore, it is the policy of LLNL to comply with applicable ES&H laws, regulations, and requirements

  19. Multicriteria optimization informed VMAT planning

    SciTech Connect (OSTI)

    Chen, Huixiao; Craft, David L.; Gierga, David P.

    2014-04-01

    We developed a patient-specific volumetric-modulated arc therapy (VMAT) optimization procedure using dose-volume histogram (DVH) information from multicriteria optimization (MCO) of intensity-modulated radiotherapy (IMRT) plans. The study included 10 patients with prostate cancer undergoing standard fractionation treatment, 10 patients with prostate cancer undergoing hypofractionation treatment, and 5 patients with head/neck cancer. MCO-IMRT plans using 20 and 7 treatment fields were generated for each patient on the RayStation treatment planning system (clinical version 2.5, RaySearch Laboratories, Stockholm, Sweden). The resulting DVH of the 20-field MCO-IMRT plan for each patient was used as the reference DVH, and the extracted point values of the resulting DVH of the MCO-IMRT plan were used as objectives and constraints for VMAT optimization. Weights of objectives or constraints of VMAT optimization or both were further tuned to generate the best match with the reference DVH of the MCO-IMRT plan. The final optimal VMAT plan quality was evaluated by comparison with MCO-IMRT plans based on homogeneity index, conformity number of planning target volume, and organ at risk sparing. The influence of gantry spacing, arc number, and delivery time on VMAT plan quality for different tumor sites was also evaluated. The resulting VMAT plan quality essentially matched the 20-field MCO-IMRT plan but with a shorter delivery time and less monitor units. VMAT plan quality of head/neck cancer cases improved using dual arcs whereas prostate cases did not. VMAT plan quality was improved by fine gantry spacing of 2 for the head/neck cancer cases and the hypofractionation-treated prostate cancer cases but not for the standard fractionationtreated prostate cancer cases. MCO-informed VMAT optimization is a useful and valuable way to generate patient-specific optimal VMAT plans, though modification of the weights of objectives or constraints extracted from resulting DVH of MCO-IMRT or

  20. Planning Tool for Strategic Evaluation of Facility Plans - 13570

    SciTech Connect (OSTI)

    Magoulas, Virginia; Cercy, Michael; Hall, Irin

    2013-07-01

    Savannah River National Laboratory (SRNL) has developed a strategic planning tool for the evaluation of the utilization of its unique resources for processing and research and development of nuclear materials. The Planning Tool is a strategic level tool for assessing multiple missions that could be conducted utilizing the SRNL facilities and showcasing the plan. Traditional approaches using standard scheduling tools and laying out a strategy on paper tended to be labor intensive and offered either a limited or cluttered view for visualizing and communicating results. A tool that can assess the process throughput, duration, and utilization of the facility was needed. SRNL teamed with Newport News Shipbuilding (NNS), a division of Huntington Ingalls Industries, to create the next generation Planning Tool. The goal of this collaboration was to create a simulation based tool that allows for quick evaluation of strategies with respect to new or changing missions, and clearly communicates results to the decision makers. This tool has been built upon a mature modeling and simulation software previously developed by NNS. The Planning Tool provides a forum for capturing dependencies, constraints, activity flows, and variable factors. It is also a platform for quickly evaluating multiple mission scenarios, dynamically adding/updating scenarios, generating multiple views for evaluating/communicating results, and understanding where there are areas of risks and opportunities with respect to capacity. The Planning Tool that has been developed is useful in that it presents a clear visual plan for the missions at the Savannah River Site (SRS). It not only assists in communicating the plans to SRS corporate management, but also allows the area stakeholders a visual look at the future plans for SRS. The design of this tool makes it easily deployable to other facility and mission planning endeavors. (authors)

  1. Who plans for health improvement? SEA, HIA and the separation of spatial planning and health planning

    SciTech Connect (OSTI)

    Bond, Alan; Cave, Ben; Ballantyne, Rob

    2013-09-15

    This study examines whether there is active planning for health improvement in the English spatial planning system and how this varies across two regions using a combination of telephone surveys and focus group interviews in 2005 and 2010. The spatial planning profession was found to be ill-equipped to consider the health and well-being implications of its actions, whilst health professionals are rarely engaged and have limited understanding and aspirations when it comes to influencing spatial planning. Strategic Environmental Assessment was not considered to be successful in integrating health into spatial plans, given it was the responsibility of planners lacking the capacity to do so. For their part, health professionals have insufficient knowledge and understanding of planning and how to engage with it to be able to plan for health gains rather than simply respond to health impacts. HIA practice is patchy and generally undertaken by health professionals outside the statutory planning framework. Thus, whilst appropriate assessment tools exist, they currently lack a coherent context within which they can function effectively and the implementation of the Kiev protocol requiring the engagement of health professionals in SEA is not to likely improve the consideration of health in planning while there continues to be separation of functions between professions and lack of understanding of the other profession. -- Highlights: ? Health professionals have limited aspirations for health improvement through the planning system. ? Spatial planners are ill-equipped to understand the health and well-being implications of their activities. ? SEA and HIA currently do not embed health consideration in planning decisions. ? The separation of health and planning functions is problematic for the effective conduct of SEA and/or HIA.

  2. Army energy plan

    SciTech Connect (OSTI)

    Not Available

    1980-08-08

    The Army Energy Plan describes the current and projected (to the year 2000) energy situation in which the Department of the Army (DA) must operate and summarizes those actions and programs which have been developed and/or are needed to cope with those conditions. It addresses the Army goals, objectives, policies, and programs for all Army activities. World industrial growth during the past century has been characterized and hastened by the widespread availability of inexpensive energy, primarily petroleum. The Arab oil embargo of 1973 served to drive home a number of points, key among them being that the world's principal oil consumers are not the major oil producers. The Middle East and Africa have an estimated 67 percent of the petroleum reserves while Western Europe and the Western Hemisphere have only 16 percent. By most estimates, these reserves are expected to be exhausted within the next 70 years. In the year following the 1973 oil embargo, prices for petroleum rose threefold, signaling the end of the cheap oil. In the decade of the seventies, the price of imported crude oil has risen from $1.80 per barrel to an exorbitant $30.00 per barrel. The combined threats of exhaustion and high cost mandate the use of alternate sources of energy. The distribution of alternate sources of recoverable oil, such as tar sands and oil shale, favor the Western Hemisphere, but economical recovery techniques have not been developed.

  3. Grout Facilities standby plan

    SciTech Connect (OSTI)

    Claghorn, R.D.; Kison, P.F.; Nunamaker, D.R.; Yoakum, A.K.

    1994-09-29

    This plan defines how the Grout Facilities will be deactivated to meet the intent of the recently renegotiated Tri-Party Agreement (TPA). The TPA calls for the use of the grout process as an emergency option only in the event that tank space is not available to resolve tank safety issues. The availability of new tanks is expected by 1997. Since a grout startup effort would take an estimated two years, a complete termination of the Grout Disposal Program is expected in December 1995. The former Tank Waste Remediation (TWRS) Strategy, adopted in 1988, called for the contents of Hanford`s 28 newer double-shell waste tanks to be separated into high-level radioactive material to be vitrified and disposed of in a geologic repository; low-level wastes were to be sent to the Grout Facility to be made into a cement-like-mixture and poured into underground vaults at Hanford for disposal. The waste in the 149 older single-shell tanks (SST) were to undergo further study and analysis before a disposal decision was made.

  4. Visual Sample Plan

    Energy Science and Technology Software Center (OSTI)

    2007-10-25

    VSP selects the appropriate number and location of environmental samples to ensure that the results of statistical tests performed to provide input to risk decisions have the required confidence and performance. VSP Version 5.0 provides sample-size equations or algorithms needed by specific statistical tests appropriate for specific environmental sampling objectives. It also provides data quality assessment and statistical analysis functions to support evaluation of the data and determine whether the data support decisions regarding sitesmore » suspected of contamination. The easy-to-use program is highly visual and graphic. VSP runs on personal computers with Microsoft Windows operating systems (98, NT, 2000, Millennium Edition, CE, and XP) Designed primarily for project managers and users without expertise in statistics, VSP is applicable to two- and three-dimensional populations to be sampled (e.g., rooms and buildings, surface soil, a defined layer of subsurface soil, water bodies, and other similar applications) for studies of environmental quality. VSP is also applicable for designing sampling plans for assessing chem./rad/bio threat and hazard identification within rooms and buildings, and for designing geophysical surveys for UXO identification.« less

  5. LDRD FY 2014 Program Plan

    SciTech Connect (OSTI)

    Anita Gianotto; Dena Tomchak

    2013-08-01

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  6. FreedomCAR Partnership Plan

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Partnership Plan September 5, 2002 FreedomCAR Partnership Plan ii Table of Contents Section Page I. Executive Summary ...........................................................iii II. Introduction ..............................................................................1 III. Partnership Structure, Responsibilities and Management Process ..........5 IV. Technical Scope and Objectives ..................................................8 V. Milestones and Timing

  7. DOE Emergency Public Affairs Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Headquarters Office of Public Affairs Emergency Public Affairs Plan The DOE HQ Office of Public Affairs Emergency Public Affairs Plan has been approved for implementation by: __________________________________________________________ Dan Leistikow, Director, HQ Office of Public Affairs Date: ______________ __________________________________________________________ Joseph Krol, Director, HQ Office of Emergency Management Date: ______________ DOE Office of Public Affairs Emergency Public Affairs

  8. Business Plan in Brief : Draft.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration.

    1994-06-01

    Competition is revolutionizing the electricity industry, and utilities may never be the same. In the past two decades, government deregulation has transformed the airline, cable television, natural gas, and telecommunications industries. Now, with the passage of new laws which have spurred the growth of independent power and opened up transmission access, the electric utility industry has become the laboratory for change. Here in the Northwest, dramatic changes in the electric industry mean that the Bonneville Power Administration (BPA) is facing real competition. Our customers have more choices than they had in the past. BPA`s draft Business Plan is a direct response to this changing environment. The plan presents how we propose to adapt to the new competitive marketplace. This is a summary of the plan and some of the important issues it raises for regional discussion. The draft plan contains much more detail on all the topics mentioned here. Business Plan is BPA`s first attempt to integrate the long-term strategic plans of the various parts of the agency with a strategic financial plan. Change is evident throughout the plan--change in our operating environment, in our strategic direction, in our customer and constituent relationships, and in BPA itself as an organization.

  9. Archive: LANL Community Commitment Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Archive Archive: LANL Community Commitment Plan Our good neighbor pledge: to contribute to quality of life in Northern New Mexico through economic development, excellence in education, and active employee engagement in our communities. Contact Community Relations & Partnerships (505) 665-4400 Community Commitment Plans 2014 (pdf) 2013

  10. Y-12 Site Sustainability Plan

    SciTech Connect (OSTI)

    none,; Erhart, S C; Spencer, C G

    2013-12-01

    This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.

  11. Preparation of RCRA contingency plans

    SciTech Connect (OSTI)

    Not Available

    1992-07-01

    The purpose of this guidance is to assist Department of Energy (DOE) field personnel in the preparation of Resource Conservation and Recovery Act (RCRA) contingency plans as set forth in 40 CFR 264/265 Subpart D and 270.42. The guidance will assist personnel in evaluating and ensuring facility compliance with the contingency plan requirements.

  12. Technical planning activity: Final report

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    In April 1985, the US Department of Energy's (DOE's) Office of Fusion Energy commissioned the Technical Planning Activity (TPA). The purpose of this activity was to develop a technical planning methodology and prepare technical plans in support of the strategic and policy framework of the Magnetic Fusion Program Plan issued by DOE in February 1985. Although this report represents the views of only the US magnetic fusion community, it is international in scope in the sense that the technical plans contained herein describe the full scope of the tasks that are prerequisites for the commercialization of fusion energy. The TPA has developed a well-structured methodology that includes detailed definitions of technical issues, definitions of program areas and elements, statements of research and development objectives, identification of key decision points and milestones, and descriptions of facility requirements.

  13. FY 1996 annual work plan

    SciTech Connect (OSTI)

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  14. DIGITAL ARCHITECTURE PROJECT PLAN

    SciTech Connect (OSTI)

    Thomas, Ken

    2014-09-01

    The objective of this project is to develop an industry consensus document on how to scope and implement the underlying information technology infrastructure that is needed to support a vast array of real-time digital technologies to improve NPP work efficiency, to reduce human error, to increase production reliability and to enhance nuclear safety. A consensus approach is needed because: • There is currently a wide disparity in nuclear utility perspectives and positions on what is prudent and regulatory-compliant for introducing certain digital technologies into the plant environment. For example, there is a variety of implementation policies throughout the industry concerning electromagnetic compatibility (EMC), cyber security, wireless communication coverage, mobile devices for workers, mobile technology in the control room, and so forth. • There is a need to effectively share among the nuclear operating companies the early experience with these technologies and other forms of lessons-learned. There is also the opportunity to take advantage of international experience with these technologies. • There is a need to provide the industry with a sense of what other companies are implementing, so that each respective company can factor this into their own development plans and position themselves to take advantage of new work methods as they are validated by the initial implementing companies. In the nuclear power industry, once a better work practice has been proven, there is a general expectation that the rest of the industry will adopt it. However, the long-lead time of information technology infrastructure could prove to be a delaying factor. A secondary objective of this effort is to provide a general understanding of the incremental investment that would be required to support the targeted digital technologies, in terms of an incremental investment over current infrastructure. This will be required for business cases to support the adoption of these new

  15. Hopi Sustainable Energy Plan

    SciTech Connect (OSTI)

    Norman Honie, Jr.; Margie Schaff; Mark Hannifan

    2004-08-01

    The Hopi Tribal Government as part of an initiative to ?Regulate the delivery of energy and energy services to the Hopi Reservation and to create a strategic business plan for tribal provision of appropriate utility, both in a manner that improves the reliability and cost efficiency of such services,? established the Hopi Clean Air Partnership Project (HCAPP) to support the Tribe?s economic development goals, which is sensitive to the needs and ways of the Hopi people. The Department of Energy (DOE) funded, Formation of Hopi Sustainable Energy Program results are included in the Clean Air Partnership Report. One of the Hopi Tribe?s primary strategies to improving the reliability and cost efficiency of energy services on the Reservation and to creating alternative (to coal) economic development opportunities is to form and begin implementation of the Hopi Sustainable Energy Program. The Hopi Tribe through the implementation of this grant identified various economic opportunities available from renewable energy resources. However, in order to take advantage of those opportunities, capacity building of tribal staff is essential in order for the Tribe to develop and manage its renewable energy resources. As Arizona public utilities such as APS?s renewable energy portfolio increases the demand for renewable power will increase. The Hopi Tribe would be in a good position to provide a percentage of the power through wind energy. It is equally important that the Hopi Tribe begin a dialogue with APS and NTUA to purchase the 69Kv transmission on Hopi and begin looking into financing options to purchase the line.

  16. TWRS safety program plan

    SciTech Connect (OSTI)

    Calderon, L.M., Westinghouse Hanford

    1996-08-01

    Management of Nuclear Safety, Industrial Safety, Industrial Hygiene, and Fire Protection programs, functions, and field support resources for Tank Waste Remediation Systems (TWRS) has, until recently, been centralized in TWRS Safety, under the Emergency, Safety, and Quality organization. Industrial hygiene technician services were also provided to support operational needs related to safety basis compliance. Due to WHC decentralization of safety and reengineering efforts in West Tank Farms, staffing and safety responsibilities have been transferred to the facilities. Under the new structure, safety personnel for TWRS are assigned directly to East Tank Farms, West Tank Farms, and a core Safety Group in TWRS Engineering. The Characterization Project Operations (CPO) safety organization will remain in tact as it currently exists. Personnel assigned to East Tank Farms, West Tank Farms, and CPO will perform facility-specific or project-specific duties and provide field implementation of programs. Those assigned to the core group will focus on activities having a TWRS-wide or programmatic focus. Hanford-wide activities will be the responsibility of the Safety Center of Expertise. In order to ensure an effective and consistent safety program for TWRS under the new organization program functions, goals, organizational structure, roles, responsibilities, and path forward must be clearly established. The purpose of the TWRS Safety Program Plan is to define the overall safety program, responsibilities, relationships, and communication linkages for safety personnel under the new structure. In addition, issues associated with reorganization transition are addressed, including training, project ownership, records management, and dissemination of equipment. For the purpose of this document ``TWRS Safety`` refers to all safety professionals and technicians (Industrial Safety, Industrial Hygiene, Fire Protection, and Nuclear Safety) within the TWRS organization, regardless of their

  17. Topic A Awardee: Eastern Interconnection Planning Collaborative |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Eastern Interconnection Planning Collaborative Topic A Awardee: Eastern Interconnection Planning Collaborative Eastern Interconnection Planning Collaborative The Eastern Interconnection Planning Collaborative (EIPC) was initiated by a coalition of regional Planning Authorities. These Planning Authorities are entities listed on the NERC compliance registry as Planning Authorities and represent the entire Eastern Interconnection. The EIPC was founded to be a broad-based,

  18. CITSS Project Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Project Plan CITSS Project Plan The Customer Information Technology Support System (CITSS) Project Plan, from an actual DOE Commercial Off-The-Shelf (COTS) software integration project, can be used as a template to facilitate the creation of the project plan for your particular proje CITSS Project Plan (191.42 KB) More Documents & Publications Software Configuration Management Plan CITSS Project Plan CITSS Configurable Item List: COTS Software

  19. RCRA corrective action: Work plans

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  20. Recommendations: 2010 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    0 Annual Plan Recommendations: 2010 Annual Plan URTAC - Recommendations on 2010 Section 999 Annual Plan (365.56 KB) More Documents & Publications URTAC Meeting - December 18, 2013 2009 Annual Plan 2009 Annual Plan Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program

  1. Interconnection Transmission Planning: Awards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection Transmission Planning: Awards Interconnection Transmission Planning: Awards List of Interconnection Transmission Planning awards under the American Recovery and Reinvestment Act organized by interconnection including the organization and amount of Recovery Act funding Interconnection Transmission Planning: Awards (39.73 KB) More Documents & Publications EAC Recommendations for DOE Action Regarding Interconnection-Wide Planning - June 6, 2013 Report: Impacts of Demand-Side

  2. Recommendations: Draft Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan Recommendations: Draft Annual Plan Section 999 Annual Plan Recommendations on Draft 2014 Section 999 Annual Plan (409.54 KB) More Documents & Publications URTAC Meeting - December 18, 2013 Committee Report for December 18, 2013 Meeting Recommendations: Draft 2013 Annual Plan

  3. Environmental Restoration Strategic Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Environmental Restoration Strategic Plan Environmental Restoration Strategic Plan Environmental Restoration Strategic Plan, remediating the Nuclear Weapons Complex, August 1995, environmental_restoration_strategic_plan.pdf Environmental Restoration Strategic Plan (1.46 MB) More Documents & Publications FOIA Requests received by DOE Headquarters (HQ) since December 31, 2008 Audit Report: IG-0528 Office of Information Resources (MA-90)

  4. 2007 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    7 Annual Plan 2007 Annual Plan Section 999: 2007 Annual Plan (9.24 MB) More Documents & Publications 2007 Annual Plan for the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program Recommendations: Draft 2008 Section 999 Annual Plan UDAC Meeting - September 2009

  5. Work Plans & Manuals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Plans & Manuals Work Plans & Manuals This list contains audit and inspections manuals and a list of planned reviews to be conducted by the Office of Audits and Inspections. Documents Available for Download November 20, 2014 Work Plan FY 2016 Planned Audits and Inspections for FY 2016 December 23, 2014 Audit Manual 2014 Office of Inspector General Audit Manual

  6. Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: A planning parameters study

    SciTech Connect (OSTI)

    Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W. Robert; Yin, Fang-Fang; Wu, Q. Jackie

    2013-11-15

    Purpose: Adaptive radiation therapy for prostate cancer using online reoptimization provides an improved control of interfractional anatomy variations. However, the clinical implementation of online reoptimization is currently limited by the low efficiency of current strategies and the difficulties associated with integration into the current treatment planning system. This study investigates the strategies for performing fast (?2 min) automatic online reoptimization with a clinical fluence-map-based treatment planning system; and explores the performance with different input parameters settings: dose-volume histogram (DVH) objective settings, starting stage, and iteration number (in the context of real time planning).Methods: Simulated treatments of 10 patients were reoptimized daily for the first week of treatment (5 fractions) using 12 different combinations of optimization strategies. Options for objective settings included guideline-based RTOG objectives, patient-specific objectives based on anatomy on the planning CT, and daily-CBCT anatomy-based objectives adapted from planning CT objectives. Options for starting stages involved starting reoptimization with and without the original plan's fluence map. Options for iteration numbers were 50 and 100. The adapted plans were then analyzed by statistical modeling, and compared both in terms of dosimetry and delivery efficiency.Results: All online reoptimized plans were finished within ?2 min with excellent coverage and conformity to the daily target. The three input parameters, i.e., DVH objectives, starting stage, and iteration number, contributed to the outcome of optimization nearly independently. Patient-specific objectives generally provided better OAR sparing compared to guideline-based objectives. The benefit in high-dose sparing from incorporating daily anatomy into objective settings was positively correlated with the relative change in OAR volumes from planning CT to daily CBCT. The use of the original

  7. Sample Business Plan Framework 5

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 5: A program that establishes itself as a government entity, then operates using a fee-based structure.

  8. Sample Business Plan Framework 2

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 1: A program seeking to continue operations in the post-grant period as a not-for-profit (NGO) entity.

  9. Sample Business Plan Framework 4

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 4: A program seeking to continue in the post-grant period as a marketing contractor to a utility.

  10. Sample Business Plan Framework 3

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 3: A government entity running a Commercial PACE program in the post-grant period.

  11. EERE Unveils New Strategic Plan

    Broader source: Energy.gov [DOE]

    EERE has developed a new Strategic Plan and Implementing Framework to advance its mission and to continue to play a global leadership role in developing and deploying clean, sustainable and affordable energy technologies.

  12. Generation Planning (pbl/generation)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Generation Hydro Power Wind Power Monthly GSP BPA White Book Dry Year Tools Firstgov Generation Planning Thumbnail image of BPA White Book BPA White Book (1998-2014) Draft Dry...

  13. Solid Waste Management Program Plan

    SciTech Connect (OSTI)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  14. Strategic Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This Strategic Plan offers a glance at the Office of the Inspector General's long term effort to work with the Department of Energy's leadership to improve the management and ...

  15. Land and Facility Use Planning

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-07-09

    The Land and Facility Use Planning process provides a way to guide future site development and reuse based on the shared long-term goals and objectives of the Department, site and its stakeholders. Does not cancel other directives.

  16. Sample Business Plan Framework 1

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy Better Buildings Neighborhood Program: Sample Business Plan Framework 1: A program seeking to continue operations in the post-grant period as a not-for-profit (NGO) entity.

  17. Chemical Hygiene and Safety Plan

    SciTech Connect (OSTI)

    Berkner, K.

    1992-08-01

    The objective of this Chemical Hygiene and Safety Plan (CHSP) is to provide specific guidance to all LBL employees and contractors who use hazardous chemicals. This Plan, when implemented, fulfills the requirements of both the Federal OSHA Laboratory Standard (29 CFR 1910.1450) for laboratory workers, and the Federal OSHA Hazard Communication Standard (29 CFR 1910.1200) for non-laboratory operations (e.g., shops). It sets forth safety procedures and describes how LBL employees are informed about the potential chemical hazards in their work areas so they can avoid harmful exposures and safeguard their health. Generally, communication of this Plan will occur through training and the Plan will serve as a the framework and reference guide for that training.

  18. Excess Uranium Inventory Management Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The 2013 Excess Uranium Inventory Management Plan describes a framework for the effective management of the Energy Department’s surplus uranium inventory in support of meeting its critical...

  19. Minorities in Energy Strategic Plan

    Broader source: Energy.gov [DOE]

    The Department of Energy announced the Industry Partner Network on Tuesday, November 18, 2014 and also released a new Strategic Plan for the Minorities in Energy Initiative (MIE), which can be...

  20. Planning for Years to Come

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (NNSA) Response Planning for Emergencies Emergency Management is the application of the necessary resources to mitigate consequences of an emergency and protect workers, the public, the environment, and national security. It consists of key activities: planning, preparedness, readiness assurance, and response. NNSA has a fully implemented and fully integrated departmental comprehensive emergency management system at the ready. To accomplish this, we develop and implement specific programs,

  1. Integrated Distribution Planning Concept Paper

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Distribution Planning Concept Paper www.irecusa.org A Proactive Approach for Accommodating High Penetrations of Distributed Generation Resources May 2013 Integrated Distribution Planning Concept Paper A Proactive Approach for Accommodating High Penetrations of Distributed Generation Resources Tim Lindl and Kevin Fox Interstate Renewable Energy Council, Inc. Abraham Ellis and Robert Broderick Sandia National Laboratories May 2013 IREC enables greater use of clean energy in a sustainable way by

  2. Performance Evaluation and MEasurement Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Occupational Medical Services at Hanford J-10-1 PERFORMANCE EVALUATION AND MEASUREMENT PLAN Fiscal Year 2017 Occupational Medical Services Contract DE-EM0002043, Modification 048 Occupational Medical Services at Hanford SECTION J ATTACHMENT J-10 DE-EM0002043, Mod 048 Occupational Medical Services at Hanford J-10-2 Occupational Medical Services Contract Fiscal Year (FY) 2017 - October 1, 2016 through September 30, 2017 Performance Evaluation and Measurement Plan (PEMP) Table of Contents 1.0

  3. The rare crystallographic structure of d(CGCGCG){sub 2}: The natural spermidine molecule bound to the minor groove of left-handed Z-DNA d(CGCGCG){sub 2} at 10 {sup o}C

    SciTech Connect (OSTI)

    Ohishi, Hirofumi . E-mail: ohishi@gly.oups.ac.jp; Tozuka, Yoshitaka; Da-Yang, Zhou; Ishida, Toshimasa; Nakatani, Kazuhiko

    2007-06-22

    Several crystal structure analyses of complexes of synthetic polyamine compounds, including N {sup 1}-(2-(2-aminoethylamino))ethyl)ethane-1,2-diamine PA(222) and N {sup 1}-(2-(2-(2-aminoethylamino)ethylamino)ethyl)ethane-1,2-diamine PA(2222), and left-handed Z-DNA d(CGCGCG){sub 2} have been reported. However, until now, there have been no examples of naturally occurring polyamines bound to the minor groove of the left-handed Z-DNA of d(CGCGCG){sub 2} molecule. We have found that spermidine, a natural polyamine, is connected to the minor groove of left-handed Z-DNA of d(CGCGCG){sub 2} molecule in a crystalline complex grown at 10 {sup o}C. The electron density of the DNA molecule was clear enough to determine that the spermidine was connected in the minor groove of two symmetry related molecules of left-handed Z-DNA d(CGCGCG){sub 2}. This is the first example that a spermidine molecule can form a bridge conformation between two symmetry related molecules of left-handed Z-DNA d(CGCGCG){sub 2} in the minor groove.

  4. Waste feed delivery test and evaluation plan

    SciTech Connect (OSTI)

    O'TOOLE, S.M.

    1999-09-30

    This plan documents the Waste Feed Delivery Program test and evaluation planning and implementation approach. The purpose of this document is to define and communicate the Waste Feed Delivery Program Test and Evaluation scope, objectives, planning and implementation approach.

  5. Planning for an Energy Management System

    Broader source: Energy.gov [DOE]

    This presentation discusses the Planning step as part of an Energy Management System. Planning involves establishing your energy picture, defining the scope and boundary, setting an energy baseline, and developing action plans.

  6. Plain Writing Implementation Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plain Writing Implementation Plan Plain Writing Implementation Plan Plain Writing Implementation Plan July 13, 2011.pdf (120.01 KB) More Documents & Publications Plain Language Compliance Report (2012) PLAIN LANGUAGE COMPLIANCE REPORT (2013) Plain Language Compliance Report (2014

  7. Integrated Resource Planning Model (IRPM)

    SciTech Connect (OSTI)

    Graham, T. B.

    2010-04-01

    The Integrated Resource Planning Model (IRPM) is a decision-support software product for resource-and-capacity planning. Users can evaluate changing constraints on schedule performance, projected cost, and resource use. IRPM is a unique software tool that can analyze complex business situations from a basic supply chain to an integrated production facility to a distributed manufacturing complex. IRPM can be efficiently configured through a user-friendly graphical interface to rapidly provide charts, graphs, tables, and/or written results to summarize postulated business scenarios. There is not a similar integrated resource planning software package presently available. Many different businesses (from government to large corporations as well as medium-to-small manufacturing concerns) could save thousands of dollars and hundreds of labor hours in resource and schedule planning costs. Those businesses also could avoid millions of dollars of revenue lost from fear of overcommitting or from penalties and lost future business for failing to meet promised delivery by using IRPM to perform what-if business-case evaluations. Tough production planning questions that previously were left unanswered can now be answered with a high degree of certainty. Businesses can anticipate production problems and have solutions in hand to deal with those problems. IRPM allows companies to make better plans, decisions, and investments.

  8. Lochinvar Preliminary Plan Comments | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lochinvar Preliminary Plan Comments Lochinvar Preliminary Plan Comments Comments to DOE on Certification, Compliance and Enforcement Regulations for Consumer Products and Commercial and Industrial Equipment EO 13563 Preliminary Plan Microsoft Word - Lochinvar Comments -EO 13563 Preliminary Plan.docx (111.29 KB) More Documents & Publications Notice of Availability of Preliminary Plan for Retrospective Analysis of Existing Rules Regulatory Burden RFI AHRI Preliminary Plan for Retrospective

  9. Energy Conservation Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Conservation Plans Energy Conservation Plans Headquarters Program and Staff Office Energy Conservation Plans As part of the Department's Energy Efficiency campaign, each Headquarters Program and Staff Office participated in a contest early in 2010 to develop the best Energy Conservation Plan. These plans involved simple changes that employees could implement as part of their daily routines to help conserve energy. Plans were then divided into categories and reviewed by a panel to determine the

  10. NERSC Strategic Plan Is Now Online

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Is Now Online NERSC Strategic Plan Is Now Online June 3, 2013 The NERSC Strategic Plan for FY2014-2023 is now available for download (PDF | 3.2MB). Requested by the DOE Office of Advanced Scientific Computing Research as input for ASCR's long-term planning, the strategic plan discusses NERSC's mission, goals, science drivers, planned initiatives, and technology strategy, among other topics. ≫More NERSC publications and reports. About NERSC and Berkeley Lab The National Energy

  11. IT Capital Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    IT Capital Planning IT Capital Planning IT7 (003).jpg What is Capital Planning? The Office of Management and Budget (OMB) Circular A-11, defines capital planning as "a decision-making process for ensuring IT investments integrate strategic planning, budgeting, procurement, and IT management in support of agency missions and business needs." Who's Responsible for DOE Capital Planning? The Office of the Chief Information Officer (OCIO) oversees the DOE IT portfolio, while the Information

  12. Planning integration FY 1996 program plan. Revision 1

    SciTech Connect (OSTI)

    1995-09-01

    This Multi-Year Program Plan (MAP) Planning Integration Program, Work Breakdown Structure (WBS) Element 1.8.2, is the primary management tool to document the technical, schedule, and cost baseline for work directed by the US Department of Energy (DOE), Richland Operations Office (RL). As an approved document, it establishes an agreement between RL and the performing contractors for the work to be performed. It was prepared by Westinghouse Hanford Company (WHC) and Pacific Northwest Laboratory (PNL). The MYPPs for the Hanford Site programs are to provide a picture from fiscal year (FY) 1996 through FY 2002. At RL Planning and Integration Division (PID) direction, only the FY 1996 Planning Integration Program work scope has been planned and presented in this MAP. Only those known significant activities which occur after FY 1996 are portrayed in this MAP. This is due to the uncertainty of who will be accomplishing what work scope when, following the award of the Management and Integration (M&I) contract.

  13. Security, Emergency Planning & Safety Records | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security, Emergency Planning & Safety Records Security, Emergency Planning & Safety Records PDF icon ADM 180.pdf More Documents & Publications ADMINISTRATIVE RECORDS SCHEDULE 18: ...

  14. Prepare comprehensive implementation plan | Open Energy Information

    Open Energy Info (EERE)

    comprehensive implementation plan Jump to: navigation, search Stage 4 LEDS Home Introduction to Framework Assess current country plans, policies, practices, and capacities...

  15. 2007 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Annual Plan More Documents & Publications 2007 Annual Plan for the Ultra-Deepwater and Unconventional Natural Gas and Other Petroleum Resources Research and Development Program...

  16. ARM - Lesson Plans: Air Density and Temperature

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Teachers' Toolbox Lesson Plans Lesson Plans: Air Density and Temperature Objective The objective of this activity is to investigate the effect of temperature on the density of air. ...

  17. Office of Infrastructure Planning & Analysis | National Nuclear...

    National Nuclear Security Administration (NNSA)

    Gallery Photo Gallery Jobs Apply for Our Jobs Our Jobs Working at NNSA Blog Home Office of Infrastructure Planning & Analysis Office of Infrastructure Planning & Analysis...

  18. Transportation in Community Strategic Energy Plans | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    in Community Strategic Energy Plans Transportation in Community Strategic Energy Plans This presentation features Caley Johnson, a fuel and vehicle market analyst with the National ...

  19. Annual Planning Summaries: 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Annual Planning Summaries: 2014 January 20, 2014 2014 Annual Planning Summary for the Environmental Management Energy Technology Engineering Center The ongoing and projected...

  20. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Section 4.0 No significant changes. Comprehensive Legacy Management and Institutional Controls Plan, Revision 9, Draft Volume I, Legacy Management Plan Significant Changes Summary ...

  1. California Groundwater Management Plans | Open Energy Information

    Open Energy Info (EERE)

    Groundwater Management Plans Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: California Groundwater Management PlansLegal Published...

  2. Strategic Sustainability Performance Plan. Discovering Sustainable...

    Office of Scientific and Technical Information (OSTI)

    Energy's research mission and operations as reflected in the Department's Strategic Plan. ... Country of Publication: United States Language: English Subject: 29 ENERGY PLANNING, ...

  3. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT: Natural...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COUNCIL - WORK PLANNING FORMAT: Natural Gas Use in Transportation PDF icon RCC Workplan NGV.PDF More Documents & Publications REGULATORY COOPERATION COUNCIL - WORK PLANNING ...

  4. Wind Program: Program Plans, Implementation, and Results

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Learn more about this EERE Office. Plans Discover the plans, budgets, and analyses that set the direction of office priorities and activities. Implementation Find out how the...

  5. Chapter 7 - Acquisition Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Sourcing Requirements - Update May 2014 PDF icon 7.3 - Acuqisition Planning in the M&O Environment More Documents & Publications Policy Flash 2015-13 ACQUISITION PLANNING ...

  6. Operations Strategic Planning Committee | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Strategic Planning Committee The Operations Strategic Planning Committee has come up with an initial list of new opportunities and opportunities for improvement over the...

  7. Annual Planning Summaries: 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Annual Planning Summaries: 2013 March 25, 2013 2013 Annual Planning Summary for the Argonne Site Office The ongoing and projected Environmental Assessments and Environmental...

  8. Ten Year Site Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    It is a comprehensive site-wide plan encompassing the needs of tenant activities. The TYSP is integral to and supports the Department's Planning, Programming, Budgeting, and ...

  9. Annual Planning Summaries: 2011 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Annual Planning Summaries: 2011 February 14, 2011 2011 Annual Planning Summary for Environmental Management (EM) The ongoing and projected Environmental Assessments and ...

  10. 2015 Strategic Sustainability Performance Plan | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2015 Strategic Sustainability Performance Plan 2015 Strategic Sustainability Performance Plan Document displays the U.S. Department of Energy's 2015 Strategic Sustainability ...

  11. Albro Planning Environmental APE | Open Energy Information

    Open Energy Info (EERE)

    Albro Planning Environmental APE Jump to: navigation, search Name: Albro Planning & Environmental (APE) Place: Pembrokeshire, United Kingdom Zip: SA43 3LH Sector: Renewable Energy,...

  12. Building America Residential Energy Efficiency Research Planning...

    Broader source: Energy.gov (indexed) [DOE]

    Research Planning meeting in October 2011, held in Washington, D.C. Residential Energy Efficiency Planning Meeting Summary Report (634.05 KB) More Documents & Publications ...

  13. Residential Energy Efficiency Research Planning Meeting Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Efficiency Research Planning Meeting Summary Report Residential Energy Efficiency Research Planning Meeting Summary Report This report summarizes key findings and outcomes ...

  14. Sandia National Laboratories: News: Publications: Strategic Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan Sandia's FY16-FY20 Strategic Plan both reflects our continued dedication to the work we do and reinforces the importance of the integrated Laboratories'...

  15. National Clean Energy Business Plan Competition | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Competition National Clean Energy Business Plan Competition The National Clean Energy Business Plan Competition inspired nearly 300 university teams across the country to create ...

  16. From Deterministic Inversion to Uncertainty Quantification: Planning...

    Office of Scientific and Technical Information (OSTI)

    Planning a Long Journey in Ice Sheet Modeling. Citation Details In-Document Search Title: From Deterministic Inversion to Uncertainty Quantification: Planning a Long Journey in ...

  17. ATLAS_Strategic_Plan_09_v5

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    IL November 2009 2 Introduction This strategic plan is developed jointly by the ATLAS user community and the Physics Division at Argonne National Laboratory. This plan is a...

  18. LFRG Program Management Plan (LFRG PMP)

    Office of Environmental Management (EM)

    LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN SEPTEMBER 18, 2000 LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP PROGRAM MANAGEMENT PLAN Jay ...

  19. 2014 DOE Strategic Sustainability Performance Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    & Publications 2014 Strategic Sustainability Performance Plan U.S. Department of Energy 2014 Strategic Sustainability Performance Plan Department of Energy 2014...

  20. 2013 Strategic Sustainability Performance Plan | Department of...

    Office of Environmental Management (EM)

    & Publications 2014 DOE Strategic Sustainability Performance Plan U.S. Department of Energy 2014 Strategic Sustainability Performance Plan FY 2006 Executive Order 13101...

  1. Strategic Planning, Analysis, and Geothermal Informatics Subprogram...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Strategic Planning, Analysis, and Geothermal Informatics Subprogram Overview Strategic Planning, Analysis, and Geothermal Informatics Subprogram Overview This is an overview of ...

  2. Interconnection-Wide Transmission Planning Initiative - Meeting...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Interconnection-Wide Transmission Planning Initiative - Meeting Calendars Click on the links below to ...

  3. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Western Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Western ...

  4. Interconnection-Wide Transmission Planning Initiative: Topic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Eastern Interconnection on Electric Resource Planning and Priorities Interconnection-Wide Transmission Planning Initiative: Topic B, Cooperation Among States in the Eastern ...

  5. Program Plan | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Program Plan Revised Program Plan approval is pending, new program direction concepts are described in a 3-pager, here. 151124 REMS Slides

  6. Enclosures Standing Technical Committee Strategic Plan report...

    Energy Savers [EERE]

    Enclosures Standing Technical Committee Strategic Plan report Enclosures Standing Technical Committee Strategic Plan report This report outlines the research path for increasing ...

  7. Headquarters Facilities Master Security Plan- Acronyms

    Office of Energy Efficiency and Renewable Energy (EERE)

    2016 Headquarters Facilities Master Security Plan - Acronyms A list of the acronyms contained in the 2016 Headquarters Facilities Master Security Plan (HQFMSP).

  8. ARM - Lesson Plans: Historical Climate Statistics

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Historical Climate Statistics Outreach Home Room News Publications Traditional Knowledge ... Teachers' Toolbox Lesson Plans Lesson Plans: Historical Climate Statistics Objective The ...

  9. Data Management Facility Operations Plan (Program Document) ...

    Office of Scientific and Technical Information (OSTI)

    Program Document: Data Management Facility Operations Plan Citation Details In-Document Search Title: Data Management Facility Operations Plan The Data Management Facility (DMF) is ...

  10. ARM - Data Management and Documentation Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    DocumentationData Management and Documentation Plan Policies, Plans, Descriptions Data Documentation Home Data Sharing and Distribution Policy Data Management and Documentation ...

  11. Data Center Optimization Plan | Department of Energy

    Energy Savers [EERE]

    Data Center Optimization Plan Data Center Optimization Plan The Department of Energy (DOE) is committed to the overall reduction in the number of its data centers, consolidation of ...

  12. Validation Data Plan Implementation: Subcooled Flow Boiling

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Validation Data Plan Implementation: Subcooled Flow Boiling Case Study Anh Bui and Nam ... INLMIS-12-27303 September 2012 Validation Data Plan Implementation: Subcooled Flow ...

  13. Interconnection-Wide Transmission Planning Initiative: Topic...

    Energy Savers [EERE]

    the Texas Interconnection Interconnection-Wide Transmission Planning Initiative: Topic B, State Agency Input Regarding Electric Resource and Transmission Planning in the Texas ...

  14. Bonneville Power Administration Program Specific Recovery Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bonneville Power Administration Program Specific Recovery Plan Bonneville Power Administration Program Specific Recovery Plan PDF icon Microsoft Word - PSRP May 15 2009 BPA ...

  15. Waste Management Quality Assurance Plan

    SciTech Connect (OSTI)

    Not Available

    1993-11-30

    Lawrence Berkeley Laboratory`s Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department`s activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A.

  16. Recommendations: Draft 2012 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2 Annual Plan Recommendations: Draft 2012 Annual Plan Recommendations: Draft Section 999 2012 Annual Plan Section 999 - Recommendations: Draft 2012 Annual Plan (341.3

  17. Recommendations: Draft 2013 Annual Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Annual Plan Recommendations: Draft 2013 Annual Plan URTAC - Recommendations on Draft 2013 Section 999 Annual Plan URTAC - Recommendations on Draft 2013 Annual Plan (457.55

  18. LM Annual NEPA Planning Summary 2015 | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    LM Annual NEPA Planning Summary 2015 More Documents & Publications 2015 Annual NEPA Planning Summaries Annual NEPA Planning Summary Report Template 2013 Annual Planning Summary for...

  19. Site Sustainability Plan (SSP) 2010 | Department of Energy

    Energy Savers [EERE]

    Site Sustainability Plan (SSP) 2010 Site Sustainability Plan (SSP) 2010 Site Sustainability Plan (SSP) 2010 2010 More Documents & Publications 2015 Site Sustainability Plan Site...

  20. Fiscal year 1987 program plan

    SciTech Connect (OSTI)

    Not Available

    1986-12-01

    The Defense TRU Waste Program (DTWP) is the focal point for the Department of Energy in national planning, integration, operation, and technical development for TRU waste management. The scope of this program extends from the point of TRU waste generation through delivery to a permanent repository. The TRU program maintains a close interface with repository development to ensure program compatibility and coordination. The defense TRU program does not directly address commercial activities that generate TRU waste. Instead, it is concerned with providing alternatives to manage existing and future defense TRU wastes. The FY 87 Program Plan is consistent with the Defense TRU Waste Program goals and objectives stated in the Defense Transuranic Waste Program Strategy Document, January 1984. The roles of participants, the responsibilities and authorities for Operations, and Research Development (R D), the organizational interfaces and communication channels for R D and the establishment of procedures for planning, reporting, and budgeting of Operations and R D activities meet requirements stated in the Technical Management Plan for the Transuranic Waste Management Program. Detailed budget planning (i.e., programmatic funding and capital equipment) is presented for FY 87; outyear budget projections are presented for future years.

  1. Improved Planning Time and Plan Quality Through Multicriteria Optimization for Intensity-Modulated Radiotherapy

    SciTech Connect (OSTI)

    Craft, David L.; Hong, Theodore S.; Shih, Helen A.; Bortfeld, Thomas R.

    2012-01-01

    Purpose: To test whether multicriteria optimization (MCO) can reduce treatment planning time and improve plan quality in intensity-modulated radiotherapy (IMRT). Methods and Materials: Ten IMRT patients (5 with glioblastoma and 5 with locally advanced pancreatic cancers) were logged during the standard treatment planning procedure currently in use at Massachusetts General Hospital (MGH). Planning durations and other relevant planning information were recorded. In parallel, the patients were planned using an MCO planning system, and similar planning time data were collected. The patients were treated with the standard plan, but each MCO plan was also approved by the physicians. Plans were then blindly reviewed 3 weeks after planning by the treating physician. Results: In all cases, the treatment planning time was vastly shorter for the MCO planning (average MCO treatment planning time was 12 min; average standard planning time was 135 min). The physician involvement time in the planning process increased from an average of 4.8 min for the standard process to 8.6 min for the MCO process. In all cases, the MCO plan was blindly identified as the superior plan. Conclusions: This provides the first concrete evidence that MCO-based planning is superior in terms of both planning efficiency and dose distribution quality compared with the current trial and error-based IMRT planning approach.

  2. Asotin Creek Model Watershed Plan

    SciTech Connect (OSTI)

    Browne, D.; Holzmiller, J.; Koch, F.; Polumsky, S.; Schlee, D.; Thiessen, G.; Johnson, C.

    1995-04-01

    The Asotin Creek Model Watershed Plan is the first to be developed in Washington State which is specifically concerned with habitat protection and restoration for salmon and trout. The plan is consistent with the habitat element of the ``Strategy for Salmon``. Asotin Creek is similar in many ways to other salmon-bearing streams in the Snake River system. Its watershed has been significantly impacted by human activities and catastrophic natural events, such as floods and droughts. It supports only remnant salmon and trout populations compared to earlier years. It will require protection and restoration of its fish habitat and riparian corridor in order to increase its salmonid productivity. The watershed coordinator for the Asotin County Conservation District led a locally based process that combined local concerns and knowledge with technology from several agencies to produce the Asotin Creek Model Watershed Plan.

  3. Y-12 Site Sustainability Plan

    SciTech Connect (OSTI)

    Spencer, Charles G

    2012-12-01

    The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan, while promoting overall sustainability and reduction of greenhouse gas emissions. The mission of the Y-12 Energy Management program is to incorporate energy-effi cient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. The plan addresses greenhouse gases, buildings, fleet management, water use, pollution prevention, waste reduction, sustainable acquisition, electronic stewardship and data centers, site innovation and government-wide support.

  4. Environmental development plan: coal liquefaction

    SciTech Connect (OSTI)

    Not Available

    1980-08-01

    This Environmental Development plan (EDP) examines environmental concerns that are being evaluated for the technologies in DOE's Coal Liquefaction Program. It identifies the actions that are planned or underway to resolve these concerns while the technologies are being developed. Research is scheduled on the evaluation and mitigation of potential environmental impacts. This EDP updates the FY 1977 Coal Liquefaction Program EDP. Chapter II describes the DOE Coal Liquefaction Program and focuses on the Solvent Refined Coal (SRC), H-Coal, and Exxon donor solvent (EDS) processes because of their relatively advanced R and D stages. The major unresolved environmental concerns associated with the coal liquefaction subactivities and projects are summarized. The concerns were identified in the 1977 EDP's and research was scheduled to lead to the resolution of the concerns. Much of this research is currently underway. The status of ongoing and planned research is shown in Table 4-1.

  5. TWRS Systems Engineering Working Plan

    SciTech Connect (OSTI)

    Eiholzer, C.R.

    1994-09-16

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations.

  6. American Samoa Energy Action Plan

    SciTech Connect (OSTI)

    Haase, Scott; Esterly, Sean; Herdrich, David; Bodell, Tim; Visser, Charles

    2013-08-01

    Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

  7. CEBAF - environmental protection program plan

    SciTech Connect (OSTI)

    1995-10-01

    An important objective in the successful operation of the Continuous Electron Beam Accelerator Facility (CEBAF) is to ensure protection of the public and the environment. To meet this objective, the Southeastern Universities Research Association, Inc., (SURA) is committed to working with the US Department of Energy (DOE) to develop, implement, and manage a sound and workable environmental protection program at CEBAF. This environmental protection plan includes information on environmental monitoring, long-range monitoring, groundwater protection, waste minimization, and pollution prevention awareness program plan.

  8. Pennsylvania State University: Business Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Penn State - Collegiate Wind Competition Business Plan Remote Wind Power Systems Unit April 18, 2014 Remote Wind PSU Organization Teams Team Contact Number of Members Business Plan Bridget Dougherty - bad5194@psu.edu 6 Market Issues Bridget Dougherty - bad5194@psu.edu 3 Market Turbine Prototype Design and Construction Ken Palamara - kjp5176@psu.edu 7 Manufacturing and Cost Analysis Ty Druce - tvd5081@psu.edu 7 Lifetime Analysis Nick Ward - njw5071@psu.edu 3 Market Opportunity Evan Masters -

  9. Strategic Energy Planning - Mississippi Choctaw

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Planning Lessons Learned Mississippi Band of Choctaw Indians January 27, 2016 Mississippi Choctaw Overview  Federal Recognition in 1945  10,500 enrolled members  35,000 acres of Trust Land  8 Communities in East Central Mississippi  Democratically-elected Government Topics 1. Why Mississippi Choctaw decided to do a Strategic Energy Plan 2. Our Timeline 3. What data we gathered in advance 4. How we assembled our "Stakeholders" group 5. How we structured our 2 day

  10. Open Government Plan Self Evaluation

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Government Plan Self Evaluation Page 1 of 3 NAME OF AGENCY: Department of Energy NAME OF EVALUATOR: TheAnne Gordon DIRECTIONS The enclosed list of 30 criteria is drawn directly from the text of the Open Government Directive. Please return this form to the White House Open Government team at opengov@ostp.gov by 5 pm on Friday, April 23 rd . To complete the self- evaluation form, please indicate a response to each of the criteria as follows: Red (R) - plan does not satisfy the requirement Yellow

  11. EERE Plans, Implementation, and Results Glossary

    Broader source: Energy.gov [DOE]

    Definitions of the office overview, plans, implementation, and results document and website categories are provided below:

  12. ESPC ENABLE Measurement and Verification Plan Template

    Broader source: Energy.gov [DOE]

    Document contains a comprehensive measurement and verification plan template for a proposed ESPC ENABLE project.

  13. 2008 Audit Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    8 Audit Plan Document Number: NA Effective Date: 05/2007

  14. 2011 Audit Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1 Audit Plan Document Number: NA Effective Date: 06/2010

  15. 2012 Audit Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2 Audit Plan Document Number: NA Effective Date: 07/2011

  16. 2013 Audit Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    3 Audit Plan Document Number: NA Effective Date: 08/2013

  17. 2014 Audit Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4 Audit Plan Document Number: NA Effective Date: 01/2014

  18. Configuration Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Configuration Management Plan Configuration Management Plan This template is used for documenting the configuration management methodology, tools, techniques, roles and responsibilities and tasks for a systems development project. Configuration Management Plan (96.89 KB) More Documents & Publications SOFTWARE QUALITY & SYSTEMS ENGINEERING PROGRAM: Software Configuration Management Checklist NMMSS Software Quality Assurance Plan Software Configuration Management (SCM) A Practical Guide

  19. Work Plan FY 2016 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Plan FY 2016 Work Plan FY 2016 Planned Audits and Inspections for FY 2016 A list of audits and inspections planned for FY 2016 by the U.S. Department of Energy, Office of Inspector General, Office of Audits and Inspections Work Plan FY 2016 (218.5 KB) More Documents & Publications Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan Planned Audits and Inspections FY 2013 Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs

  20. Institutional plan. Fiscal year, 1997--2002

    SciTech Connect (OSTI)

    1996-10-01

    The Institutional Plan is the culmination of Argonne`s annual planning cycle. The document outlines what Argonne National Laboratory (ANL) regards as the optimal development of programs and resources in the context of national research and development needs, the missions of the Department of Energy and Argonne National Laboratory, and pertinent resource constraints. It is the product of ANL`s internal planning process and extensive discussions with DOE managers. Strategic planning is important for all of Argonne`s programs, and coordination of planning for the entire institution is crucial. This Institutional Plan will increasingly reflect the planning initiatives that have recently been implemented.

  1. Program Evaluation: Strategic Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Why, What, & When to Evaluate » Program Evaluation: Strategic Planning Program Evaluation: Strategic Planning One way to have useful and cost-effective evaluations is to strategically plan evaluation activity so it supports management activity cycles for planning, budgeting, analysis, program implementation, and benefits reporting and communication. In this way, evaluations generate information to feed into critical decision processes and continuous improvement. Planning evaluations

  2. Data Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data Management Plan Data Management Plan A data management plan explains how data generated in the course of the work performed under an EERE award will be shared and preserved or, when justified, explains why data sharing or preservation is not possible or scientifically appropriate. No specific template, but follow the guidelines in this file. Data Management Plan (53.62 KB) More Documents & Publications DOE Public Access Plan RE: NBP RFI: Data Access In the Matter of Implementing the

  3. EERE Strategic Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EERE Strategic Plan EERE Strategic Plan EERE_Strategic_Plan_Cover.jpg The 2016-2020 Strategic Plan and Implementing Framework from the Office of Energy Efficiency and Renewable Energy (EERE) is the blueprint for launching the nation's leadership in the global clean energy economy. This document will guide the organization to build on decades of progress in powering our nation from clean, affordable and secure energy. Plan highlights include: - 7 strategic goal sections aligned along EERE's core

  4. 2011 Strategic Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    1 Strategic Plan 2011 Strategic Plan In May 2011, The Department of Energy released its 2011 strategic plan (Updated February 13, 2012), a comprehensive blueprint to guide the agency's core mission of ensuring America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. 2011_DOE_Strategic_Plan_.pdf (1.34 MB) DOE Strategic Plan_2012 GPRA Addendum.PDF (60.28 KB) More Documents & Publications ITP

  5. 2014 - 2018 Strategic Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 - 2018 Strategic Plan 2014 - 2018 Strategic Plan In April 2014, The Department of Energy released its 2014 - 2018 strategic plan, a comprehensive blueprint to guide the agency's core mission of ensuring America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. 2014 - 2018 Department of Energy Strategic Plan (1.17 MB) More Documents & Publications 2006 Department of Energy Strategic Plan -

  6. Medical Plans for Non-Medicare Retirees

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Non-Medicare Medical Medical Plans for Non-Medicare Retirees Blue Cross Blue Shield of New Mexico (BCBSNM) is the provider of medical benefits. Contact Retiree Insurance Providers The Laboratory offers the following two medical plans to non-Medicare retirees for the 2016 calendar year: High-Deductible Health Plan (HDHP) Preferred Provider Option (PPO) Plan Blue Cross Blue Shield of New Mexico (BCBSNM) is the provider of the Laboratory's medical benefits. Retiree medical plan premiums are subject

  7. 2016 Site Sustainability Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    6 Site Sustainability Plan 2016 Site Sustainability Plan The purpose of this Site Sustainability Plan (SSP) is to outline the strategies for managing, funding, and implementing sustainability-related activities within LM. This plan reflects the strategies in place and the progress made in accomplishing the goals and requirements established by multiple laws, Executive Orders, Presidential Memorandums, and DOE directives or memorandums. 2016 Site Sustainability Plan, U.S. Department of Energy

  8. 2015 Site Sustainability Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Site Sustainability Plan 2015 Site Sustainability Plan The purpose of this Site Sustainability Plan (SSP) is to outline the strategies for managing, funding, and implementing sustainability-related activities within LM. This plan reflects the strategies in place and the progress made in accomplishing the goals and requirements established by multiple laws, Executive Orders, Presidential Memorandums, and DOE directives or memorandums. 2015 Site Sustainability Plan, U.S. Department of Energy

  9. Strategix Planning and the Tribal Energy Guide

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning & The Tribal Energy Guide DOE Tribal Energy Program Review November 20, 2003 Golden, Colorado Importance of Strategic Energy Planning Defining where you want to go, and developing a roadmap to get there. Jumping into action, without a plan, can lead to mistakes, oversights, false starts, and additional costs. Strategic Energy Planning Basic Steps Vision & Champion Energy Fundamentals Culture & Environment Integrated Resource Planning Demand-Side Options Efficiency:

  10. LFRG Program Management Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Program Management Plan LFRG Program Management Plan The purpose of the EM Low-Level Waste Disposal Facility Federal Review Group Program Management Plan (LFRG PMP) is to establish the LFRG roles and responsibilities, the LFRG management processes, and the transition from DOE Order 5820.2A to DOE Order 435.1. LFRG Program Management Plan (LFRG PMP) (185.11 KB) More Documents & Publications LFRG Execution Plan Low-Level Waste Disposal Facility Federal Review Group Manual LFRG Charter

  11. Energy Emergency Planning and Management

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-07-08

    To establish the administrative and operational framework of the Energy Emergency Management System (EEMS), and to establish the general criteria for the development and coordination of the Department's energy emergency planning activities. Cancels DOE 5500.8. Canceled by DOE O 151.1 of 9-25-95.

  12. Emergency Plan | The Ames Laboratory

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration Emergency Operations Training Academy Emergency Operations Training Academy The Office of Emergency Operations, NA-40-The Emergency Operations Training Academy (EOTA) EOTA provides training and education to enhance the readiness of personnel in the radiological-nuclear emergency operations community. For more information or to contact us, visit the EOTA website at

    Emergency Plan Emergency

  13. OPPORTUNITIES IN SMR EMERGENCY PLANNING

    SciTech Connect (OSTI)

    Moe, Wayne

    2014-06-01

    This paper discusses the results of a cost/benefit-oriented assessment related to sizing of the emergency planning zones (EPZs) for advanced, small modular reactors (SMRs). An appropriately sized EPZ could result in significant cost savings for SMR licensees. Papers published by the U.S. Nuclear Regulatory Commission and other organizations discuss the applicability of current emergency preparedness regulatory requirements to SMRs, including determining an appropriate EPZ size. Both the NRC and the industry recognize that a methodology should be developed for determining appropriate EPZ sizing for SMRs. Relative costs for smaller EPZs envisioned for SMRs have been assessed qualitatively as discussed in this paper. Building off the foundation provided in the earlier papers, this paper provides a quantitative cost/benefit-oriented assessment of offsite emergency planning costs for EPZ sizes that may be justified for SMRs as compared to costs typically incurred for the current fleet of U.S. nuclear power plants. This assessment determined that a licensee utilizing a smaller EPZ could realize significant savings in offsite emergency planning costs over the nominal 40-year lifetime for an SMR. This cost/benefit-oriented assessment suggests that a reduction of the plume exposure pathway EPZ from 10 miles to the site boundary could reduce offsite emergency planning related costs by more than 90% over the 40 year life of a typical single unit nuclear power plant.

  14. Underground storage tank management plan

    SciTech Connect (OSTI)

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  15. Planning and Conducting Readiness Reviews

    Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

    2010-05-06

    This Standard provides standardized methods and approaches for planning and conducting RRs. This Standard also provides guidance for preparation of exemption requests in accordance with DOE O 251.1C. DOE O 425.1D requirements for RRs apply both to responsible contractors and to DOE

  16. PYRAMID LAKE RENEWEABLE ENERGY PLAN

    SciTech Connect (OSTI)

    HIGH DESERT GEOCULTURE, LLC

    2009-06-06

    The Pyramid Lake Renewable Energy Plan covers these areas: energy potential (primarily focusing on geothermal resource potential, but also more generally addressing wind energy potential); renewable energy market potential; transmission system development; geothermal direct use potential; and business structures to accomplish the development objectives of the Pyramid Lake Paiute Tribe.

  17. TWRS Configuration management program plan

    SciTech Connect (OSTI)

    Vann, J.M.

    1996-06-03

    The TWRS Configuration Management Program Plan (CMPP) integrates technical and administrative controls to establish and maintain consistency among requirements, product configuration, and product information for TWRS products during all life cycle phases. This CMPP will be used by TWRS management and configuration management personnel to establish and manage the technical and integrated baselines and controls and status changes to those baselines.

  18. New Production Reactors Program Plan

    SciTech Connect (OSTI)

    Not Available

    1990-12-01

    Part I of this New Production Reactors (NPR) Program Plan: describes the policy basis of the NPR Program; describes the mission and objectives of the NPR Program; identifies the requirements that must be met in order to achieve the mission and objectives; and describes and assesses the technology and siting options that were considered, the Program's preferred strategy, and its rationale. The implementation strategy for the New Production Reactors Program has three functions: Linking the design, construction, operation, and maintenance of facilities to policies requirements, and the process for selecting options. The development of an implementation strategy ensures that activities and procedures are consistent with the rationale and analysis underlying the Program. Organization of the Program. The strategy establishes plans, organizational structure, procedures, a budget, and a schedule for carrying out the Program. By doing so, the strategy ensures the clear assignment of responsibility and accountability. Management and monitoring of the Program. Finally, the strategy provides a basis for monitoring the Program so that technological, cost, and scheduling issues can be addressed when they arise as the Program proceeds. Like the rest of the Program Plan, the Implementation Strategy is a living document and will be periodically revised to reflect both progress made in the Program and adjustments in plans and policies as they are made. 21 figs., 5 tabs.

  19. PROJECT MANGEMENT PLAN EXAMPLES Deactivation Plan Project Scope and

    Office of Environmental Management (EM)

    Plan Project Scope and Objectives Examples Example 6 2.3 MISSION OBJECTIVES Stabilization of plutonium-bearing materials and deactivation/dismantlement of the PFP Complex will result in the virtual elimination of the hazards and risks associated with the facility and will greatly reduce the costs of safe, secure S&M. Using the lessons learned from deactivation projects across the DOE Complex, further improvement on previously applied deactivation methods is anticipated. The major mission

  20. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    Configuration Control Examples Example 38 7.05 Configuration Management Plan Configuration Management activities for this project will be carried out using a graded approach, consistent with the guidance in Reference #20. The CM Actions listed in Appendix B of Reference #20 will be carried out as follows: Action 1 - Develop System Boundaries This action will not be performed because the intended End State of 322-M is that all systems will be deactivated and all utility services that were

  1. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    Metrics Examples Example 42 5.1.4 Performance Measurement and Reporting The subproject manager will communicate subproject technical issues and accomplishments, schedule performance, cost and schedule issues, and corrective action plans, as appropriate, in the Project Directors' weekly 'Path Forward' meeting. However, the primary performance measurement for reporting subproject performance is provided by the performance measurement system. Within the new common database containing core

  2. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    S&M Plan Examples Example 44 5.0 SURVEILLANCE AND MAINTENANCE 5.01 Current S&M Requirements Currently, the heavy water facility is performing operational maintenance and surveillances as dictated by outside and inside facility operating rounds, facility operating procedures, facility maintenance procedures, facility alarm response procedures, and any additional surveillance and maintenance required by SFSD and SRS administrative programs and policies. As the facility progresses through

  3. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    Communication and Stakeholder Involvement Plan Examples Example 49 10.0 COMMUNICATIONS AND PUBLIC INVOLVEMENT The transition of B Plant is a critical element in Hanford's mission of environmental management. The B Plant Transition Project Management Team have made a commitment to open communications throughout transition because effective communications and public involvement are critical success factors for the project. Communications must be living and dynamic, responding to accomplishments

  4. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    Training and Qualification Plan Examples Example 66 8.2.2 Personnel Training and Qualification The Personnel Training and Qualification program is being established as defined by laws, DOE Orders, and company directives to ensure that personnel are trained and qualified to perform assigned tasks. The training and qualification program develops personnel proficiency commensurate with the scope, complexity, and nature of an assigned activity. Management is responsible for developing staff position

  5. PROJECT MANGEMENT PLAN EXAMPLES Prepare and Issue Project Plan Documents

    Office of Environmental Management (EM)

    and Issue Project Plan Documents Example Example 70 5.2 Information and Reporting Management reporting provides timely and accurate data to apprise BWHC, FDH, and DOE management of current and projected project conditions. Information contained in these reports is obtained from the same database that supports day-to-day management by BWHC. 5.2.1 Project Status Report Reporting for the 324/327 Buildings Stabilization/Deactivation Project is incorporated in the monthly PSR, prepared by BWHC for

  6. Plan

    National Nuclear Security Administration (NNSA)

    ... Sr) and cesium-137 ( Cs), 87 137 90 137 respectively, within three minutes (Smith, 1993). ... Considering data summarized by Smith (1993), the amount of radionuclides leached from melt ...

  7. Monitoring plan for Everest, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.

    2009-03-23

    This transmittal is a response to your request of January 22, 2009, for a letter work plan outlining a program of annual groundwater and surface water monitoring at Everest, Kansas. Once yearly, they propose to conduct surface water sampling at the 5 locations shown in Figure 1 and groundwater sampling in the 16 wells identified in Figure 2. The wells will be sampled according to the low-flow procedure. The next sampling event is planned for April 2009. The surface water and groundwater samples collected will be preserved, shipped, and analyzed for volatile organic compounds as in previous work at Everest. Results will be reported to the KDHE. This monitoring program will continue until identified plume conditions at the site indicate a technical justification to change the monitoring program.

  8. Industrial Plans for AEO2014

    U.S. Energy Information Administration (EIA) Indexed Site

    30, 2013 | Washington, DC WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Industrial team plans for AEO2014 Overview -- AEO2014 * Process flow status & updates * Other model updates * Major data updates * CHP updates 2 Industrial Team Washington DC, July 30, 2013 WORKING GROUP PRESENTATION FOR DISCUSSION PURPOSES DO NOT QUOTE OR CITE AS RESULTS ARE SUBJECT TO CHANGE Process flow models * General: - Replace energy consumption based on

  9. Physics Division Work Planning Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements The following is Physics Division requirements related to work planning, control and authorization for work projects and test set ups in division work areas across the laboratory. For the testing and commissioning of experimental equipment the consequences/cost of said equipment should receive careful consideration when doing the risk analysis. * Any small setup or task with total duration of less than two weeks requires an informal task hazard analysis. Informal means we can do

  10. TWP-ICE Operations Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Operations Plan Peter May, Jim Mather, Christian Jakob, Jay Mace, Greg McFarquhar With contributions from many people Overview The TWPICE experiment will take place from January 21, 2006 through February 13, 2006. During this period, there will be a substantial ground and sea based component as well as NASA, ARM, ARA and UK aircraft. The UK aircraft will also be participating in an experiment in Darwin during November- December 2005. This earlier experiment also involves aircraft associated with

  11. Multi-Year Program Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy’s Building Technologies Office’s (BTO’s) Multi-Year Program Plan (MYPP) for Fiscal Years 2016-2020 provides a broad overview of the energy use in the buildings sector, the opportunities for cost-effective energy savings, the barriers to their achievement, and BTO’s strategies and goals for achieving significant reductions in building energy use intensity.

  12. Planning and Conducting Readiness Reviews

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3006-2010 ________________________ Superseding DOE-STD-3006-2000 June 2000 DOE STANDARD PLANNING AND CONDUCTING READINESS REVIEWS U.S. Department of Energy AREA OPER Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. TS This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823.

  13. Enhanced sludge washing evaluation plan

    SciTech Connect (OSTI)

    Jensen, R.D.

    1994-09-01

    The Tank Waste Remediation System (TWRS) Program mission is to store, treat, and immobilize highly radioactive Hanford Site waste (current and future tank waste and the strontium/cesium capsules) in an environmentally sound, safe, and cost-effective manner. The scope of the TWRS Waste Pretreatment Program is to treat tank waste and separate that waste into HLW and LLW fractions and provide additional treatment as required to feed LLW and HLW immobilization facilities. Enhanced sludge washing was chosen as the baseline process for separating Hanford tank waste sludge. Section 1.0 briefly discusses the purpose of the evaluation plan and provides the background that led to the choice of enhanced sludge washing as the baseline process. Section 2.0 provides a brief summary of the evaluation plan details. Section 3.0 discusses, in some detail, the technical work planned to support the evaluation of enhanced sludge washing. Section 4.0 briefly discusses the potential important of policy issues to the evaluation. Section 5.0 discusses the methodology to be used in the evaluation process. Section 6.0 summarizes the milestones that have been defined to complete the enhanced sludge washing evaluation and provides a summary schedule to evaluate the performance of enhanced sludge washing. References are identified in Section 7.0, and additional schedule and milestone information is provided in the appendices.

  14. Buried Waste Integrated Demonstration Plan

    SciTech Connect (OSTI)

    Kostelnik, K.M.

    1991-12-01

    This document presents the plan of activities for the Buried Waste Integrated Demonstration (BWID) program which supports the environmental restoration (ER) objectives of the Department of Energy (DOE) Complex. Discussed in this plan are the objectives, organization, roles and responsibilities, and the process for implementing and managing BWID. BWID is hosted at the Idaho National Engineering Laboratory (INEL), but involves participants from throughout the DOE Complex, private industry, universities, and the international community. These participants will support, demonstrate, and evaluate a suite of advanced technologies representing a comprehensive remediation system for the effective and efficient remediation of buried waste. The processes for identifying technological needs, screening candidate technologies for applicability and maturity, selecting appropriate technologies for demonstration, field demonstrating, evaluation of results and transferring technologies to environmental restoration programs are also presented. This document further describes the elements of project planning and control that apply to BWID. It addresses the management processes, operating procedures, programmatic and technical objectives, and schedules. Key functions in support of each demonstration such as regulatory coordination, safety analyses, risk evaluations, facility requirements, and data management are presented.

  15. AVLIS production plant waste management plan

    SciTech Connect (OSTI)

    Not Available

    1984-11-15

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables.

  16. Effective Strategies for Participating in Utility Planning

    Broader source: Energy.gov [DOE]

    Better Buildings Neighborhood Program Working with Utilities Peer Exchange Call: Effective Strategies for Participating in Utility Planning, Call Slides and Discussion Summary, August 2, 2012. This Peer Exchange Call discussed effective strategies for participating in utility planning.

  17. City of Boulder- Climate Action Plan Fund

    Broader source: Energy.gov [DOE]

    Note: As of 2015, the Climate Action Plan is now referred to as the Climate Commitment. In November 2015, Boulder voters approved an extension of the  Climate Action Plan tax through 2020, with...

  18. Model Commissioning Plan and Guide Specifications

    SciTech Connect (OSTI)

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  19. Guide to Community Energy Strategic Planning: Step

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... Depending upon the scope of the plan, this may be a full-time assignment or a part-time addition to other duties. If possible, the Plan Manager should be someone who already has or ...

  20. Savannah River Site Environmental Implementation Plan

    SciTech Connect (OSTI)

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  1. EUCI 16th Annual Integrated Resource Planning

    Broader source: Energy.gov [DOE]

    EUCI is hosting an annual conference about integrated resource planning to showcase best practices that properly recognize and address changes in the grid. The program features leading utility, power resource planning professional and related industry experts addressing these key issues.

  2. Spent Nuclear Fuel Project Safety Management Plan

    SciTech Connect (OSTI)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities.

  3. FY 2016 - Stockpile Stewardship and Management Plan

    SciTech Connect (OSTI)

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  4. Plan B Energy | Open Energy Information

    Open Energy Info (EERE)

    B Energy Jump to: navigation, search Name: Plan B Energy Place: Suite 402, Ontario, Canada Zip: M4P 0A3 Product: Toronto-based PV project developer. References: Plan B Energy1...

  5. 2014 DOE Climate Change Adaptation Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 U.S. Department of Energy June 2014 DOE Climate Change Adaptation Plan Table of Contents Climate Change Adaptation Plan ................................................................................................................................2 Impetus for Action ..................................................................................................................................................2 The DOE Mission and Climate Change Adaptation

  6. Implementation Plan Template - DOE Directives, Delegations, and

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements Implementation Plan Template by Website Administrator application/vnd.openxmlformats-officedocument.wordprocessingml.document icon Implementation Plan Template.docx - application/vnd.openxmlformats-officedocument.wordprocessingml.document, 12 KB (1256

  7. Community Energy Strategic Planning - Step 2

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    As the process moves forward, working groups can help dive deeper into certain aspects of the plan. Be sure to also include the media in the outreach planning. Good media coverage, ...

  8. ITEP Clean Power Plan and Tribes Training

    Broader source: Energy.gov [DOE]

    The Institute of Environmental Professionals (ITEP) is hosting a Clean Power Plan and Tribes training provides detailed information for tribes to understand the Clean Power Plan and how it applies to their tribal lands.

  9. Program Plan | netl.doe.gov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Coal and Coal-Biomass to Liquids Program Plan Revised Program Plan approval is pending, new program direction concepts are described in a 3-pager, here. 151124 REMS Slides

  10. FY 2015 - Stockpile Stewardship and Management Plan

    SciTech Connect (OSTI)

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  11. TWRS systems engineering software configuration management plan

    SciTech Connect (OSTI)

    Porter, P.E.

    1996-10-09

    This plan delineates the requirements for control of software developed and supported by the Tank Waste Remediation System (TWRS) Technical Integration organization. The information contained in this plan shall assist employees involved with software modification and configuration control.

  12. LTS Plan Workshop Questions and Comments

    Office of Legacy Management (LM)

    ... will be available to the public on the web and at locations noted in the LTS Plan ... the LTS Plan which will be posted on the web and available at the Interpretive Center ...

  13. PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and

    Office of Environmental Management (EM)

    Quality Assurance Plan Examples Example 64 8.3 QUALITY ASSURANCE This section describes policies and procedures that will be used to meet QA program objectives. This section also develops the strategies PFP will use to ensure the S&M of the PFP inventory, the material stabilization project, the deactivation project, and the dismantlement of the PFP Complex buildings and are completed in a high quality manner. 8.3.1 QA Program The QA program for the PFP Stabilization and Deactivation Project

  14. American particle and nuclear physics planning

    SciTech Connect (OSTI)

    Montgomery, Hugh E.

    2014-10-01

    In the United States the planning process relevant to future deep inelastic scattering involves both the high energy physics and nuclear physics funding and the two communities. In Canada there is no such split between the communities. Within the past two years there have been several planning initiatives and there may be more to come. We review the current status of both the planning and the plans.

  15. Weatherization Assistance Program Quality Work Plan Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quality Work Plan Requirements Weatherization Assistance Program Quality Work Plan Requirements Four square graphic of a document, a conversation bubble, a checkbox and a certification seal. The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization

  16. Planning for Solar Projects on Federal Sites

    Broader source: Energy.gov [DOE]

    Planning for the federal site solar project can begin after the solar solar pre-screening is complete.

  17. Regional Planning Process in the West

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning Process in the West Robert H. Easton Tribal Webinar Series March 30, 2016 Transmission Planning in the Western Interconnection  Transmission Planning in the Western Interconnection has been, is, and will continue to be a hierarchy of local, regional, and interconnection-wide coordinated planning efforts  Pre-Order 890 - CAISO, NTTG, ColumbiaGrid, and WestConnect were already forums for collaboration and coordination - WECC PCC Project Coordination and Path Rating Process, Annual

  18. SEAB Climate Action Plan | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    SEAB Climate Action Plan SEAB Climate Action Plan A presentation on the Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy. Climate Action Plan (pdf) (998.5 KB) More Documents & Publications U.S. Energy Sector Vulnerabilities to Climate Change and Extreme Weather Climate Change and the U.S. Energy Sector: Regional Vulnerabilities and Resilience Solutions Climate Change: Energy and Community Impacts

  19. Energy Planning Technical Assistance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance » On-Request Technical Assistance » Energy Planning Technical Assistance Energy Planning Technical Assistance Energy project planning technical assistance is intended to assist Indian tribes and Alaska Native villages with early assessment, program design, and options analysis. Below is a list of the various options for this type of technical assistance. To apply for energy planning technical assistance, complete the online technical assistance request form. Energy

  20. FE - Fossil Energy - Energy Conservation Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enclosure (1) Office of Fossil Energy Energy Conservation Plan The Office of Fossil Energy (FE) strongly supports the implementation of strategies to reduce energy consumption in the Headquarters buildings. FE engaged its employees by sending an office-wide email soliciting input for this plan; the ideas were then compiled into this document. The focus of this plan is on how FE employees can change their behavior to reduce energy consumption. This plan purposefully excludes measures that would

  1. FTCP Plans & Reports | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Plans & Reports FTCP Plans & Reports Biennial Report FTCP Biennial Report - Calendar Years 2013-2014 FTCP Biennial Report - Calendar Years 2011-2012 FTCP Biennial Report - Calendar Years 2009-2010 Annual Reports FTCP Annual Report - Calendar Year 2008 FTCP Annual Report - Calendar Year 2007 FTCP Annual Report - Fiscal Year 2004 FTCP Annual Report - Fiscal Year 2002 Status Report FTCP Senior Technical Safety Manager (STSM) Status Report FTCP Strategic Plan FTCP Strategic Plan - Fiscal

  2. MA - Office of Management - Energy Conservation Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MA Energy Conservation Plan January 2010 1 Office of Management Office-Level Energy Conservation Plan January 2010 I. BACKGROUND This energy conservation plan represents an effort to reduce energy consumption within Office of Management (MA) office spaces and to increase employee awareness of and participation in energy conservation measures. II. SCOPE The plan and procedures in this document apply to all Office of Management (MA) office suites in the Forrestal and Germantown Facilities as well

  3. EIS-0380: Mitigation Action Plan Annual Report

    Broader source: Energy.gov [DOE]

    Los Alamos National Laboratory Site-Wide Environmental Impact Statement Fiscal Year 2012 Mitigation Action Plan Annual Report

  4. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    II Environmental Management Headquarters Corrective Action Plan - Radiological Release ... actions for addressing Office of Environmental Management (EM) Headquarters (HQ) ...

  5. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. .........32 Comprehensive Legacy Management and Institutional Controls ...

  6. POST-CLOSURE CARE AND INSPECTION PLAN

    Office of Legacy Management (LM)

    Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. .........35 Comprehensive Legacy Management and Institutional Controls ...

  7. Configuration management plan for LABCORE Program

    SciTech Connect (OSTI)

    Rich, H.S.

    1995-01-03

    A hardware/software configuration management plan for LABCORE. LABCORE is a laboratory information management system used by Analytical Services.

  8. Waste shipment engineering data management plan

    SciTech Connect (OSTI)

    Marquez, D.L.

    1995-05-01

    This plan documents current data management practices and future data management improvements for TWRS Waste Shipment Engineering.

  9. Eastern Band of Cherokee - Strategic Energy Planning

    Energy Savers [EERE]

    Project Participants * Sub consultant and Energy Committee - Energy Committee: Staff from CDOT, Planning and Development, Environmental Department, Executive Office, GIS ...

  10. National Ignition Facility project execution plan

    SciTech Connect (OSTI)

    Paisner, J., LLNL

    1997-08-01

    This project execution plan covers: Justification of Mission Need; Project Description; Management Roles and Responsibilities; Project Execution; Method of Accomplishment.

  11. State Energy Program Strategic Plan: February 2007

    Broader source: Energy.gov [DOE]

    This strategic plan describes the challenges faced by the States and the four key goals established to meet those challenges.

  12. Space Conditioning Standing Technical Committee Strategic Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    This strategic plan document outlines the gaps, barriers, and opportunities identified by the Building America Space Conditioning Standing Technical Committee.

  13. NREL: Technology Deployment - Climate Action Planning Tool

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Home Technology Deployment Climate Action Planning Tool Technology Deployment - Climate Action Planning Tool NREL's Climate Action Planning Tool provides a quick, basic estimate of how various technology options can contribute to an overall climate action plan for your research campus. Use the tool to identify which options will lead to the most significant reductions in consumption of fossil fuels and in turn meet greenhouse gas reduction goals. Follow these four steps: Gather baseline energy

  14. Community Energy Strategic Planning- Step 8

    Broader source: Energy.gov [DOE]

    This presentation provides Step 8 to the Community Energy Strategic Planning approach, Develop a Blueprint for Implementation.

  15. Chicago Metropolitan Agency for Planning Data Dashboard

    Broader source: Energy.gov [DOE]

    The data dashboard for Chicago Metropolitan Agency for Planning, a partner in the Better Buildings Neighborhood Program.

  16. 7.0 - Integrated Acquisition Planning Process

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    .0 (August 2006) 1 INTEGRATING ACQUISITION PLANNING PROCESSES - AN OVERVIEW REFERENCES 1. FAR Part 7 Acquisition Planning 2. FAR Part 34 Major System Acquisition 3. Acquisition Letter 2005-08R, Small Business Programs 4. Acquisition Guide Chapter 7.1, Acquisition Planning 5. Acquisition Guide Chapter 42.5, Contract Management Planning 6. DOE O 580.1 Department of Energy Property Management Program 7. DOE O 413.3 Program and Project Management for the Acquisition of Capital Assets Guiding

  17. Light duty utility arm startup plan

    SciTech Connect (OSTI)

    Barnes, G.A.

    1998-03-11

    This Startup Plan encompasses activities necessary to perform startup and operation of the LDUA in Facility Group 3 tanks and complete turnover to CPO. The activities discussed in this plan will occur prior to, and following the US Department Energy, Richland Operations Office Operational Readiness Review. This startup plan does not authorize or direct any specific field activities or authorize a change of configuration. As such, this startup plan need not be Unresolved Safety Question (USQ) screened.

  18. strategic-plan-for-advanced-model-development

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Strategic Plan for Advanced Model Development at CMAP Kermit Wies List of Authors ================ Kermit Wies Chicago Metropolitan Agency for Planning 312 386 8820 This email address is being protected from spambots. You need JavaScript enabled to view it. Abstract ========= The CMAP modeling cadre (under contract) is preparing a detailed multi-year plan for establishing advanced travel modeling in the Chicago region. A feature of the plan will be a schedule for pursuing development of

  19. Strategic Energy Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Technical Assistance » On-Request Technical Assistance » Strategic Energy Planning Strategic Energy Planning The U.S. Department of Energy Office of Indian Energy provides tribes and Alaska Native communities with technical assistance and resources for strategic energy planning. A strategic energy plan clearly identifies a community's energy priorities and can provide valuable guidance for decision making and better position a community for new opportunities to increase tribal self-sufficiency

  20. The conservation planning analysis model. Final report

    SciTech Connect (OSTI)

    Not Available

    1993-12-31