  1. Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Work Plan NSSAB Members Vote on Work Plan Tasks; The Nevada Site Specific Advisory Board operates on a fiscal year basis and conducts work according to a NSSAB generated and U.S. Department of Energy (DOE) approved work plan. FY 2016 Work Plan Work plan items focus on providing recommendations to the DOE regarding the following subjects: soil contamination from historic atmospheric nuclear testing, remediation of contaminated facilities used to support historic testing, groundwater studies

  2. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    SciTech Connect (OSTI)

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  3. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    SciTech Connect (OSTI)

    1996-03-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action(UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1996). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will be evaluated in the site-specific environmental assessment to determine potential environmental impacts and provide stakeholders a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  4. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards.

  5. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

  6. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River.

  7. Site observational work plan for the UMTRA Project site at Riverton, Wyoming

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the application of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents.

  8. Mon Valley work plan

    Office of Legacy Management (LM)

    GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for ... . . . . . . . . 1-1 1.3 Sources of Ground-Water Contamination from Milling Operations . . ...

  9. Quality Work Plan Requirements

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization services and leverages the resources developed through the Guidelines for Home Energy Professionals project. Below you will find links to QWP guidance, as well as links to the individual requirements.

  10. Supplement to the site observational work plan for the UMTRA project site at Ambrosia Lake, New Mexico

    SciTech Connect (OSTI)

    1995-11-01

    The purpose of this document is to provide additional and more detailed information to supplement review of the site observational work plan (SOWP) (DOE, 1995) for the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This document includes a discussion of the average linear velocity of the ground water in the alluvium and a discussion of the ground water quality of the alluvium, weathered Mancos Shale, and the Tres Hermanos-C Member of the Mancos Shale. The data from a 1989 aquifer test were analyzed using the curve-matching software AQTESOLV and then compared with the original results. A hydrograph of the ground water elevations in monitoring wells screened in the alluvium is presented to show how the ground water elevations change with time. Stiff and Piper diagrams were created to describe the changes in ground water geochemistry in the alluvium/weathered Mancos Sahel unit, the Tres Hermanos-C Sandstone unit, the Tres Hermanos-B Sandstone unit, and the Dakota Sandstone. Background information on other related topics such as site history, cell construction, soil characteristics, and well construction are presented in the SOWP. A geologic cross section depicts the conceptual model of the hydrostratigraphy and ground water chemistry of the Ambrosia Lake site. Hydrogeologic information of each hydrostratigraphic unit is presented.

  11. Supplement to the site observational work plan for the UMTRA Project Site at Ambrosia Lake, New Mexico

    SciTech Connect (OSTI)

    1996-02-01

    The purpose of this document is to provide additional and more detailed information to supplement review of the site observational work plan (SOWP) for the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This document includes a discussion of (1) the average linear velocity of the ground water in the alluvium; (2) the ground water quality of the alluvium, weathered Mancos Shale, and the Tres Hermanos-C Member of the Mancos Shale; and (3) the fate and transport of contaminants from the uppermost aquifer to the Westwater Canyon Member of the Morrison Formation. The data from a 1989 aquifer test were analyzed using the curve-matching software AQTESOLV and then compared with the original results. A hydrograph of the ground water elevations in monitoring wells screened in the alluvium is presented to show how the ground water elevations change with time. Stiff and Piper diagrams were created to describe the changes in ground water geochemistry in the alluvium/weathered Mancos Shale unit, the Tres Hermanos-C Sandstone unit, the Tres Hermanos-B Sandstone unit, and the Dakota Sandstone. Background information on other related topics such as site history, cell construction, soil characteristics, and well construction are presented in the SOWP. Figure 1 is a geologic cross section depicting the conceptual model of the hydrostratigraphy and ground water chemistry of the Ambrosia Lake site. Table 1 presents hydrogeologic information of each hydrostratigraphic unit.

  12. Work plan (Nov

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ARM STM Cloud Modeling Working Group Session AGENDA Brief introduction of new ARM funded modeling projects: ---------------------------------------------------------------------------------------------------------- 1:00 pm - 1:05 pm Understanding and Improving CRM and GCM Simulations of Cloud Systems with ARM Observations (Xiaoqing Wu, Iowa State University) 1:05 pm - 1:10 pm Interactions of Cumulus Convection and the Boundary Layer at the Southern Great Plains ACRF (Steve Krueger, University of

  13. WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL

    Office of Legacy Management (LM)

    WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community

  14. FY 1994 Annual Work Plan

    SciTech Connect (OSTI)

    Not Available

    1993-09-30

    In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

  15. Quality Work Plan Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    * No national standards for work quality * No portable and nationally recognized credentials for experienced WAP workers 3 NaConal Issues and Interests Supported the QWP * White ...

  16. RCRA corrective action: Work plans

    SciTech Connect (OSTI)

    Not Available

    1995-02-01

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  17. Physics Division Work Planning Requirements

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Requirements The following is Physics Division requirements related to work planning, control and authorization for work projects and test set ups in division work areas across the laboratory. For the testing and commissioning of experimental equipment the consequences/cost of said equipment should receive careful consideration when doing the risk analysis. * Any small setup or task with total duration of less than two weeks requires an informal task hazard analysis. Informal means we can do

  18. FY 1996 annual work plan

    SciTech Connect (OSTI)

    1995-09-30

    In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

  19. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT: Natural...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    COUNCIL - WORK PLANNING FORMAT: Natural Gas Use in Transportation PDF icon RCC Workplan NGV.PDF More Documents & Publications REGULATORY COOPERATION COUNCIL - WORK PLANNING ...

  20. TWRS Systems Engineering Working Plan

    SciTech Connect (OSTI)

    Eiholzer, C.R.

    1994-09-16

    The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations.

  1. Work Plans & Manuals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Plans & Manuals Work Plans & Manuals This list contains audit and inspections manuals and a list of planned reviews to be conducted by the Office of Audits and Inspections. Documents Available for Download November 20, 2014 Work Plan FY 2016 Planned Audits and Inspections for FY 2016 December 23, 2014 Audit Manual 2014 Office of Inspector General Audit Manual

  2. Fiscal Year 2015 Annual Work Plan Update

    Broader source: Energy.gov [DOE]

    At the February 18, 2015 Committee meeting Overview and Synopsis of the Work Planned for FY'15 at LANL

  3. Work Plan FY 2016 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Work Plan FY 2016 Work Plan FY 2016 Planned Audits and Inspections for FY 2016 A list of audits and inspections planned for FY 2016 by the U.S. Department of Energy, Office of Inspector General, Office of Audits and Inspections Work Plan FY 2016 (218.5 KB) More Documents & Publications Combined Fiscal Year (FY) 2015 Annual Performance Results and FYs 2016 and 2017 Annual Performance Plan Planned Audits and Inspections FY 2013 Combined Fiscal Year (FY) 2014 Annual Performance Results and FYs

  4. Weatherization Assistance Program Quality Work Plan Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Quality Work Plan Requirements Weatherization Assistance Program Quality Work Plan Requirements Four square graphic of a document, a conversation bubble, a checkbox and a certification seal. The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization

  5. CRAD, Work Controls Assessment Plan

    Broader source: Energy.gov [DOE]

    Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed.

  6. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 10/08/2013 December (no committee mtgs) January February PNNL update on geophysics characterization (where does this fit into the HAB FY2014 Work Plan?) Update on 100-N RI/FS and Proposed Plan Rev 0; advice development o Review of recommendations of proposed plans o Draft A = Committee Round Robin; Rev 0 = Advice 100-N Groundwater Modeling Tutorial Update on Orchard Lands Work Plan o Review of recommendations of proposed plans o Draft A = Committee Round Robin; Rev 0 = Advice Online

  7. Transportation Plan Ad Hoc Working Group | Department of Energy

    Office of Environmental Management (EM)

    Plan Ad Hoc Working Group Transportation Plan Ad Hoc Working Group PDF icon Transportation Plan Ad Hoc Working Group More Documents & Publications Nuclear Fuel Storage and...

  8. PIC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/18/15 (Blue titles indicate those topics specifically identified in the 2015 HAB Work Plan; Italicized items indicate tentative) February March April Committee Call 2/18 Committee Call Placeholder 3/18 Committee Mtg Placeholder 4/7 (1 p.m. - 5 p.m.) Committee Business o Update 3-month committee work plan o Round-robin of HAB member outreach Debrief TPA Agency Public Involvement Events o What worked well; what didn't work well o Identify areas of possible improvements Holding Bin for future PIC

  9. B Plant Complex preclosure work plan

    SciTech Connect (OSTI)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.

  10. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5/12/15 Facilitator notes in blue June Committee meeting placeholder: Tuesday, June 16 Call placeholder: Tuesday, June 23, 1:30 p.m. August Committee meeting placeholder: Tuesday, August 4 Call placeholder: Tuesday, August 11, 1:30 p.m. September Committee meeting placeholder: Tuesday, Sept. 22 Call placeholder: Tuesday, Sept. 29, 1:30 p.m.  No topics planned for June meeting  RI/FS work plans for SW-2, WA-1, and DV-1  200 Area groundwater remediation (follow up, 100-N)  Call planned

  11. Burn site groundwater interim measures work plan.

    SciTech Connect (OSTI)

    Witt, Jonathan L.; Hall, Kevin A.

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  12. Hanford Advisory Board FY2014 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1/2013 Hanford Advisory Board FY2014 Work Plan Page 1 of 8 Topic Policy Level Issue HAB Action 1 Agency Priority for HAB Committee Assignment (lead in bold) Comments Site-Wide Tank Closure & Waste Management EIS * Protectiveness * Feasibility * Budget impacts * Schedule impacts * Review proposed/publicized RODs Potential Advice PIC, RAP, TWC River Corridor 618-11 Start in time to end in time Tracking (diligence) RAP 1 Advice, foundational understanding for subsequent year's priority work,

  13. ICDF Complex Remedial Action Work Plan

    SciTech Connect (OSTI)

    W. M. Heileson

    2006-12-01

    This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

  14. China-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name China-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  15. ClimateWorks-Egypt-Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks-Egypt-Low Carbon Growth Planning Support Redirect page Jump to: navigation, search REDIRECT ClimateWorks Low Carbon Growth Planning Support Retrieved from "http:...

  16. Enterprise Assessments Targeted Review, Work Planning and Control...

    Energy Savers [EERE]

    Work Planning and Control at the Nevada National Security Site - October 2015 Enterprise Assessments Targeted Review, Work Planning and Control at the Nevada National Security Site ...

  17. Enterprise Assessments Targeted Review, Work Planning and Control...

    Energy Savers [EERE]

    Review, Work Planning and Control at the Hanford Tank Farms - April 2015 Enterprise Assessments Targeted Review, Work Planning and Control at the Hanford Tank Farms - April 2015...

  18. Enterprise Assessments Targeted Review of Work Planning and Control...

    Energy Savers [EERE]

    Review of Work Planning and Control at the Hanford Central Plateau Environmental Remediation Projects - June 2015 Enterprise Assessments Targeted Review of Work Planning and...

  19. Microsoft Word - Final FY14 WM Committee Work Plan 093013

    Office of Environmental Management (EM)

    4 Work Plan Approved September 25, 2013 1 Northern New Mexico Citizens' Advisory Board (NNMCAB) WASTE MANAGEMENT COMMITTEE 2014 Work Plan SECTION I. MISSION STATEMENT The Northern...

  20. Kenya-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Kenya-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  1. India-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name India-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  2. Brazil-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Brazil-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  3. Guyana-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Guyana-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  4. Mexico-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Mexico-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  5. Malaysia-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    Malaysia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Malaysia-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks,...

  6. Indonesia-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Indonesia-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  7. Egypt-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Egypt-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks, Project...

  8. Ethiopia-ClimateWorks Low Carbon Growth Planning Support | Open...

    Open Energy Info (EERE)

    Ethiopia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Ethiopia-Low Carbon Growth Planning Support AgencyCompany Organization ClimateWorks,...

  9. Housekeeping category corrective action unit work plan

    SciTech Connect (OSTI)

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process.

  10. Technical WOrk Plan for: Construction Effects Monitoring

    SciTech Connect (OSTI)

    S. Goodin

    2006-09-14

    This document is the technical work plan (TWP) for performing the Construction Effects Monitoring (CEM) activity, which is one of 20 testing and monitoring activities included in Performance Confirmation Plan (BSC 2004 [DIRS 172452]). Collectively, the 20 activities make up the Performance Confirmation Program described in the plan. Each of the other 19 activities will have a separate TWP. This plan, though titled Construction Effects Monitoring, in accordance with the Performance Confirmation Plan, also includes testing that may be performed in addition to monitoring, if required. Performance confirmation is required by regulation 10 CFR Part 63 [DIRS 173273], and was started during site characterization (consistent with the regulation) and will continue until permanent closure of the repository (10 CFR 63.13 1 (b) [DIRS 173273]). This CEM activity has two primary goals: (1) to collect, analyze, and report on repository rock properties data for the purpose of confirming geotechnical and design parameters used in repository design, and (2) to provide information intended to confirm that the ability to retrieve waste from the repository has been preserved. It will be necessary for information from this CEM activity to be evaluated in combination with that obtained from other Performance Confirmation Program activities to achieve these goals. These relationships with other Performance Confirmation Program activities (e.g., drift inspection, subsurface mapping, and seismicity monitoring) will be discussed in later sections of this TWP.

  11. PIC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    worked well; what didn't work well o Identify areas of possible improvements Holding Bin for future PIC meeting topics WTP Communications Strategy o Debrief the TWC discussion from December o Identify PIC next steps as applicable including review of draft white paper if available Frame TPA Tutorial o Based on the tutorial given in November, discuss any additional framing questions/points to bring forward to the full Board in February Brainstorm Tutorial Topics o 100 D/H Proposed Plan Committee

  12. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Risk-based retrieval, IM updatediscussion LAWPSCesium, IM updatediscussion WTP Communication Plan, IM updatediscussion TVAT Implementation Plan Update HOLDING BIN...

  13. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/8/15 Facilitator notes in blue January Committee meeting placeholder: Tuesday, Jan. 12 Call placeholder: Tuesday, Jan. 19, 1:30 p.m. February Committee meeting placeholder: Tuesday, Feb. 9 Call placeholder: Tuesday, Feb. 16, 1:30 p.m. March Committee meeting placeholder: Tuesday, Mar. 5 Call placeholder: Tuesday, Mar. 22, 1:30 p.m.  100 D/H advice discussion  618-10 VPU update  PW-1/3/6 Work Plan (discuss EPA comments) o Will need DOE's responses to comments + general introduction o

  14. HSEP Committee FY 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY 2016 Work Plan Updated 12/10/2015 during the committee meeting Beryllium program update  Placeholder Annual Employee Concerns Program  Placeholder  Hear from new program director at WRPS  Quarter 1 (Oct-Dec) Quarter 2 (Jan-Mar) Quarter 3 (Apr-Jun) Quarter 4 (July-Sept) Holding Bin Transportation Effects on Worker Safety - draft advice  Review of draft advice Safety culture improvement efforts (joint with TWC)  Discuss Sounding Board for upcoming Board meeting o Review

  15. Integration of Safety Culture Attributes into EFCOG Work Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Planning and Control Guidance Document Integration of Safety Culture Attributes into EFCOG ... Topics Covered: Integration of Safety Culture (SC) Attributes into EFCOG Work Planning and ...

  16. Waste Management Committee Fiscal Year 2015 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 5 Work Plan Waste Management Committee Fiscal Year 2015 Work Plan Topics: TA-54 Consent Order Deliverables FY'17 Budget National Waste Forum WM-FY15-WP - November 17, 2014 (255.83

  17. Waste Management Committee Fiscal Year 2012 Work Plan | Department...

    Office of Environmental Management (EM)

    Management Committee Fiscal Year 2012 Work Plan Waste Management Committee Fiscal Year 2012 Work Plan Topics: TA-21 TA-54 RiskBenefit Principles Consent Order PDF icon WM-FY12-WP...

  18. Waste Management Committee Fiscal Year 2014 Work Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4 Work Plan Waste Management Committee Fiscal Year 2014 Work Plan Topics: TA-54 Consent Order TA-49 Remediation TA-21 Remediation Material Disposal Areas WM-FY14-WP - September 25, ...

  19. Waste Management Committee Fiscal Year 2013 Work Plan | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 Work Plan Waste Management Committee Fiscal Year 2013 Work Plan Topics: TA-21 TA-54 RiskBenefit Principles TA-49 Fiscal Year 2012 Budget WM-FY13-WP - September 26, 2012 (13.32

  20. Headquarters Facilities Work Planning and Control Program | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program (1.88 MB) More Documents & Publications AUDIT REPORT: OAS-L-04-07 CRAD, Feedback and Continuous Improvement - DOE Headquarters - December 4, 2007 Independent Oversight Review, DOE Headquarters Facilities - March 2002

  1. 2014 Quality Work Plan (QWP) Update | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    14 Quality Work Plan (QWP) Update 2014 Quality Work Plan (QWP) Update This update was given at the 2014 ACI National Home Performance Conference & Trade Show in Detroit, Michigan by Josh Olsen of the U.S. Department of Energy. 2014 Quality Work Plan (QWP) Update Presentation (2.11 MB) More Documents & Publications How to align field guides and standards to the Standard Work Specifications WPN 14-4: Quality Work Plan Requirement WPN 15-4: QUALITY WORK PLAN REQUIREMENT UPDATE

  2. REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy COOPERATION COUNCIL - WORK PLANNING FORMAT REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT REGULATORY COOPERATION COUNCIL - WORK PLANNING FORMAT RCC Workplan PDF EN FR.PDF (67.81 KB) More Documents & Publications REGULATORY COOPERATION COUNCIL: Annual Workplan for Energy Efficiency Standards, July 2016 REGULATORY COOPERATION COUNCIL: Annual Workplan for Energy Efficiency Standards REGULATORY PARTNERSHIP STATEMENT

  3. Work Plan - U.S.-India Coal Working Group | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Work Plan - U.S.-India Coal Working Group (700.48 KB) More Documents & Publications Work Group Telecom (Draft Charters) U.S.-India Coal Working Group Terms of Reference Work Group ...

  4. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    24, 3:00 p.m. Swim lanes WTP Communication Plan update( following joint topic w PIC @ their April meeting) Cesium IM update Leadership Retreat Preparation + EM...

  5. Utilities Working with Industry: Action Plan

    SciTech Connect (OSTI)

    none,

    2010-06-25

    This action plan outlines joint ITP and utility activities that will help reach a national goal of reducing energy by 25 percent over then next 10 years.

  6. Biomass Burning Observation Project Science Plan (Program Document...

    Office of Scientific and Technical Information (OSTI)

    Science Plan Citation Details In-Document Search Title: Biomass Burning Observation Project Science Plan Aerosols from biomass burning perturb Earth's climate through the direct ...

  7. Memorandum, NNSA Activity Level Work Planning & Control Processes, January 2006

    Broader source: Energy.gov [DOE]

    January 23, 2006 Memorandum from Thomas P. D’Agostino, Assistant Deputy Administrator for Program Integration, Action: Revitalizing Integrated Safety Management; Site Office Action Plans for Improving Activity Level Work Planning and Control Processes.

  8. CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Development - 2016/17; April 12, 2016 | Department of Energy CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan Development - 2016/17; April 12, 2016 CANADA-UNITED STATES REGULATORY COOPERATION COUNCIL Webinar: Work Plan Development - 2016/17; April 12, 2016 Work Plan and Development 2016-04-12 (207.15 KB) More Documents & Publications Canada-United States Regulatory Cooperation Council Webinar: Proposed Approach for Energy Efficiency Standards North America Energy

  9. Office of Enterprise Assessments Targeted Review of Work Planning and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Control and Biological Safety at the Los Alamos National Laboratory - December 2015 | Department of Energy Office of Enterprise Assessments Targeted Review of Work Planning and Control and Biological Safety at the Los Alamos National Laboratory - December 2015 Office of Enterprise Assessments Targeted Review of Work Planning and Control and Biological Safety at the Los Alamos National Laboratory - December 2015 December 2015 Review of Work Planning and Control and Biological Safety at the

  10. Enterprise Assessments Targeted Review, Work Planning and Control at the

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada National Security Site - October 2015 | Department of Energy Review, Work Planning and Control at the Nevada National Security Site - October 2015 Enterprise Assessments Targeted Review, Work Planning and Control at the Nevada National Security Site - October 2015 October 2015 Targeted Review of the Work Planning and Control at the Nevada National Security Site The U.S. Department of Energy (DOE) Office of Enterprise Assessments (EA) conducted an independent review of activity-level

  11. Integration of Safety Culture Attributes into EFCOG Work Planning and

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Control Guidance Document | Department of Energy Safety Culture Attributes into EFCOG Work Planning and Control Guidance Document Integration of Safety Culture Attributes into EFCOG Work Planning and Control Guidance Document May 15, 2013 Presenters: Steele Coddington, NSTec, Las Vegas, and John McDonald, WRPS, Hanford Topics Covered: Integration of Safety Culture (SC) Attributes into EFCOG Work Planning and Control Guidance Document Linking SC to WP&C CRADS EFCOG and DOE SC and WP&C

  12. Nevada Site Specific Advisory Board Tackles New Work Plans, Looks...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Specific Advisory Board Tackles New Work Plans, Looks to Future Nevada Site Specific ... groundwater characterization elements during a tour of the Nevada National Security Site. ...

  13. DOE Handbook: Implementing Activity-level Work Planning & Control...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Lessons Learned Linking Safety Culture and the Effectiveness of WP&C Practices ... Small Beginnings Integration of Safety Culture Attributes into EFCOG Work Planning and ...

  14. 1800 Engineered Safety Work Planning and Controls and HF Delivery...

    Office of Scientific and Technical Information (OSTI)

    Conference: 1800 Engineered Safety Work Planning and Controls and HF Delivery System. ... Country of Publication: United States Language: English Word Cloud More Like This Full ...

  15. Microsoft Word - Final FY14 EMR Committee Work Plan 093013

    Office of Environmental Management (EM)

    Approved September 25, 2013 1 Northern New Mexico Citizens' Advisory Board (NNMCAB) ENVIRONMENTAL MONITORING and REMEDIATION COMMITTEE 2014 Work Plan SECTION I. MISSION STATEMENT...

  16. Office of Enterprise Assessments Targeted Review of Work Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Control and Biological Safety at the Los Alamos National Laboratory - December 2015 Office of Enterprise Assessments Targeted Review of Work Planning and Control and ...

  17. Office of Enterprise Assessments Targeted Review of Work Planning...

    Broader source: Energy.gov (indexed) [DOE]

    of Energy (DOE) Office of Enterprise Assessments (EA) conducted an independent review of activity-level work planning and control at the Hanford Tank Farms. The Tank Farms...

  18. Enterprise Assessments Targeted Review of Work Planning and Control...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... of activity-level work planning and control (AL-WP&C) at ... programs, and nuclear emergency response capabilities. ... However, EA identified some problems with the specification ...

  19. ISM Workshop on Work Planning and Controls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... ISM Champions Workshop 2013 14 play video Integrated Safety Management 15 ISM Champions ... Controls and Work Within Controls: * Feedback and Improvement: Ensure lessons ...

  20. HSEP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    HSEMC Homeland Security and Emergency Management Coordination (HSEMC) Program The Office of Emergency Management assists the NNSA and Department of Energy sites in integrating Department of Homeland Security initiatives into the NNSA Emergency Management System (EMS). This program provides NNSA headquarters coverage for emerging presidential directives and assistance... Planning for Emergencies Emergency Management is the application of the necessary resources to mitigate consequences of an

  1. 3210T1 WorkPlanning,Control&Auth;

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    http://www.jlab.org/div_dept/dir_off/public_affairs/logo/JLab_logo_text_white1.jpg TITLE: ES&H Manual DOCUMENT ID: 3210 Appendix T1 Work Planning, Control, and Authorization Procedure 1.0 Purpose This procedure defines work processes and controls and outlines how Jefferson Lab implements its Integrated Safety Management System (ISMS) into the planning and execution of work. These steps include: * Defining the Scope of Work * Analyzing the Hazards * Developing and Implementing Hazard Controls

  2. RAP Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    4/8/14 Facilitator notes in blue May Committee meeting placeholder: Tuesday, May 6 Call placeholder: Tuesday, May 13, 1:30 p.m. June Committee meeting placeholder: Tuesday, June 10 Call placeholder: Tuesday, June 17 August (no committee meetings in July) Committee meeting placeholder: Tuesday, August 5 Call placeholder: Tuesday, August 12, 1:30 p.m. 100-F RI/FS and Proposed Plan Rev 0 (expected to prepare advice for June) Briefing on Long Term Stewardship RCRA Class 3 modifications [August RAP

  3. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2016 Work Plan Working draft - reflects comments received from PIC, HSEP, TWC and RAP committees (updated October 22, 2015) 1 Hanford Advisory Board Draft Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area

  4. TEC Working Group Topic Groups Rail Key Documents Planning Subgroup |

    Office of Environmental Management (EM)

    Department of Energy Planning Subgroup TEC Working Group Topic Groups Rail Key Documents Planning Subgroup Planning Subgroup Rail Planning Timeline (135.57 KB) Benchmarking Project: AREVA Trip Report (651.92 KB) More Documents & Publications TEC Meeting Summaries - July 2007 Evaluation of Shortline Railroads & SNF/HLW Rail Shipment Inspections Tasked for the Transportation of Spent Nuclear Fuel Federal Railroad Administration

  5. Waste Management Committee Fiscal Year 2016 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 6 Work Plan Waste Management Committee Fiscal Year 2016 Work Plan Topics: TA-54 WIPP Recovery Operations Waste Stored at Waste Control Specialists Consent Order Deliverables FY'17 Budget National Waste Forum WM-FY16-WP - March 9, 2016 (107.69

  6. Quality Work Plan Communications Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Communications Requirement Quality Work Plan Communications Requirement Graphic of a conversation bubble. The Weatherization Assistance Program's (WAP) comprehensive Quality Work Plan establishes a benchmark for quality home energy upgrades. The plan includes a communication requirement that all WAP Grantees must meet. In this section you will learn more about this requirement and find resources and examples to help you meet this obligation in the field. Requirement Once field standards and

  7. Quality Work Plan Guidelines and Standards Requirement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy Guidelines and Standards Requirement Quality Work Plan Guidelines and Standards Requirement an icon of a page The Weatherization Assistance Program's (WAP) comprehensive Quality Work Plan establishes a benchmark for quality home energy upgrades. The plan includes a Guidelines and Standards requirement that all WAP Grantees must meet. In this section you will learn more about this requirement and find resources and examples to help you meet this obligation in the field. Requirement All

  8. WM Committee FY'16 Work Plan

    Office of Environmental Management (EM)

    AT WORK WIPP AT WORK February 1, 2010 - 12:00pm Addthis Carlsbad, NM - Transuranic (TRU) waste cleanup efforts are underway across the DOE complex, as the Waste Isolation Pilot Plant (WIPP) wraps up its 11th year of disposal operations. The Carlsbad Field Office (CBFO) manages the DOE's National TRU Program (NTP) Office and WIPP facility operations. TRU waste temporarily stored at DOE generator sites around the country is shipped to WIPP and disposed in rooms mined out of an ancient salt

  9. FY 1999 annual work plan for infrastructure program WBS 6

    SciTech Connect (OSTI)

    Donley, C.D.

    1998-08-27

    The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

  10. Office of Environmental Management Work Planning and Control Oversight |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Office of Environmental Management Work Planning and Control Oversight Office of Environmental Management Work Planning and Control Oversight May 16, 2013 Presenter: Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office Topics Covered: Contractor Good Practices: All contractors evaluate WP&C as part of their CAS URS performing corporate Phase II implementation reviews at sites where they are EM's lead contractor NWP (WIPP contractor) implemented

  11. TWC Committee 3-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1/19/15 Facilitator notes in blue January Committee meeting placeholder: Wednesday, Jan. 13 Call placeholder: Wednesday, Jan. 19, 3:00 p.m. February Committee meeting placeholder: Wednesday, Feb. 10 Call placeholder: Tuesday, Feb. 16, 3:00 p.m. March Committee meeting placeholder: Wednesday, Mar. 16 Call placeholder: Tuesday, Mar. 22, 3:00 p.m.  Committee call to discuss issue manager work and finalize February agenda  WTP Communication Approach  Cesium/LAWPS  AY-102 Status (update

  12. Office of Inspector General fiscal year 1996 annual work plan

    SciTech Connect (OSTI)

    1995-10-01

    This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

  13. Proper Sustainability: GAP Grant Proposal Work Plan Strategy Webinar

    Broader source: Energy.gov [DOE]

    In this webinar I will discuss the new GAP grant requirements for tribal environmental programs and strategies for crafting a work plan that focuses on capacity building activities.  My goal is to...

  14. Microsoft Word - Final FY14 EMR Committee Work Plan 093013

    Office of Environmental Management (EM)

    5 Work Plan Approved at the 11/19/2014 NNMCAB Board Meeting Northern New Mexico Citizens' Advisory Board (NNMCAB) ENVIRONMENTAL MONITORING and REMEDIATION COMMITTEE 2015 Work Plan SECTION I MISSION STATEMENT The Northern New Mexico Citizens' Advisory Board's (NNMCAB) Environmental Monitoring and Remediation (EM&R) Committee provides an informed citizen's perspective to the Department of Energy (DOE) on current and future environmental monitoring and remediation activities related to

  15. Microsoft Word - Final FY14 EMR Committee Work Plan 093013

    Office of Environmental Management (EM)

    6 Work Plan Approved at the March 9, 2016 Combined Committee Meeting Northern New Mexico Citizens' Advisory Board (NNMCAB) ENVIRONMENTAL MONITORING and REMEDIATION COMMITTEE 2016 Work Plan SECTION I MISSION STATEMENT The Northern New Mexico Citizens' Advisory Board's (NNMCAB) Environmental Monitoring and Remediation (EM&R) Committee provides an informed citizen's perspective to the Department of Energy (DOE) on current and future environmental monitoring and remediation activities related to

  16. Microsoft Word - FY09 Work Plan_External.doc

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Enhancing control systems security in the energy sector NSTB National SCADA Test Bed U.S. Department of Energy Office of Electricity Delivery and Energy Reliability DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan (REVISED 07/31/2009) A plan of work for the National Laboratories that form the National SCADA Test Bed: Argonne National Laboratory Idaho National Laboratory Oak Ridge National Laboratory Pacific Northwest National Laboratory Sandia National Laboratories Fiscal Year 2 0 0 9

  17. Final work plan : groundwater monitoring at Morrill, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at Morrill, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Morrill being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Morrill.

  18. Final work plan : groundwater monitoring at Centralia, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2005-08-31

    This Work Plan outlines the scope of work for a program of twice yearly groundwater monitoring at the site of a former grain storage facility at Centralia, Kansas (Figure 1.1). The purposes of this monitoring program are to follow changes in plume dynamics and to collect data necessary to evaluate the suitability of monitored natural attenuation as a remedial option, under the requirements of Kansas Department of Health and Environment (KDHE) Policy No.BER-RS-042. This monitoring program is planned for a minimum of 2 yr. The planned monitoring activity is part of an investigation at Centralia being performed on behalf of the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Details and background for this Work Plan were presented previously (Argonne 2004, 2005). Argonne has also issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan (approved by the KDHE) contains the materials common to investigations at all locations in Kansas. These documents must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Centralia.

  19. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    July 24, 2015) 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Informational x x 2. 100 D/H Proposed Plan RAP Informational x x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. 324 Waste Sites RAP Informational 5. 618-10 VPU remediation RAP Informational 6. Central Plateau Inner Area Guidelines RAP Informational x 7. ERDF RAP

  20. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Adopted by the Hanford Advisory Board on 11/5/2015, updated 12/21/15 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview and RAP Issue Manager Assignments) Topic Committee Assignment Issue Managers (lead noted in bold) Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Mattson, Suyama x 2. 100 D/H Proposed Plan RAP Engstrom, Mattson, Garnant, Leckband x 3. 100-N Proposed Plan RAP Cimon, Mattson x 4. Central Plateau Inner Area Guidelines RAP Cimon, Catrell,

  1. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    June 19, 2015June 18, 2015) 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area Guidelines RAP Project update x 5. ERDF RAP Project update x 6. Groundwater updates RAP Project update 7.

  2. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated December 21, 2015 1 Hanford Advisory Board Fiscal Year 2016 Work Plan (FY 2016 Action Overview) Topic Committee Assignment Potential FY 2016 Action/Product Action Q1 Q2 Q3 Q4 1. 100 Area retrieval process, K Basin RAP Project update x 2. 100 D/H Proposed Plan RAP Project update x 3. 100-N Proposed Plan RAP Policy discussion, Potential Advice x 4. Central Plateau Inner Area Guidelines RAP Project update x 5. ERDF RAP Project update x 6. Groundwater updates RAP Project update 7.

  3. Microsoft Word - s05822_LEHR_WorkPlan

    Office of Legacy Management (LM)

    Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 LMS/LEH/S05822-0.0 This page intentionally left blank LMS/LEH/S05822-0.0 Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial

  4. Quality Work Plan Checklist and Resources - Section 1

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Work Plan Checklist and Resources - Section 1 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. App Section 15-4 Section Question Yes No Resources V.5.1 1 Are you on track to submit current field guides and standards, including any necessary variance

  5. Quality Work Plan Checklist and Resources - Section 2

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Work Plan Checklist and Resources - Section 2 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. App Section 15-4 Section Checklist Item Yes No V.5.1 2 Have you included language in Subgrantee contracts that clearly documents the SWS specifications and

  6. Quality Work Plan Checklist and Resources - Section 3

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Work Plan Checklist and Resources - Section 3 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. The first 3 questions do not apply to the territories - instead the fourth question applies. App Section 15-4 Section Question Yes No Resources V.5.3 and/or V.8.3

  7. Quality Work Plan Checklist and Resources - Section 4

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Quality Work Plan Checklist and Resources - Section 4 State staff can use this list of questions and related resources to help implement the WAP Quality Work Plan. Each question includes reference to where in 15-4 the guidance behind the question is found, and where in the 2015 Application Package you will describe the answers to DOE. The last question applies only to Hawaii and the Territories, and the previous 4 questions do not apply to Hawaii and the Territories. App Section 15-4 Section

  8. WIPP Facility Work Plan for Solid Waste Management Units

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2001-02-25

    This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

  9. WPN 15-4 Quality Work Plan Requirement Update

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WEATHERIZATION PROGRAM NOTICE 15-4 EFFECTIVE DATE: October 21, 2014 SUBJECT: Quality Work Plan Requirement Update PURPOSE: This guidance provides updates to WPN 14-4 issued December 2, 2013. This guidance supersedes 14-4 and describes requirements to support and verify quality work in the Department of Energy's (DOE) Weatherization Assistance Program (WAP). It defines what constitutes a quality installation of weatherization measures, outlines how those measures are inspected and validated, and

  10. Audience/Panel Discussion: Sites Lesson Learned about Activity-level Work Planning and Control Using EFCOG Work Planning and Control Guideline

    Broader source: Energy.gov [DOE]

    Slide Presentation by Donna J. Governor, Deputy Dept Mgr for Planning & Integration, Lawrence Livermore National Laboratory. Lawrence Livermore National Laboratory work planning and control lessons learned and audience/panel discussion on site's lessons learned about Activity-level Work Planning and Control using EFCOG Work Planning and Control Guideline Document.

  11. Final work plan for targeted sampling at Webber, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2006-05-01

    This Work Plan outlines the scope of work for targeted sampling at Webber, Kansas (Figure 1.1). This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). Data obtained in this sampling event will be used to (1) evaluate the current status of previously detected contamination at Webber and (2) determine whether the site requires further action. This work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of and guidance for all investigations at former CCC/USDA facilities in Kansas. The Master Work Plan, approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document should be consulted for complete details of the technical activities proposed at the former CCC/USDA facility in Webber.

  12. Tank waste remediation system multi-year work plan

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  13. Hanford Advisory Board Fiscal Year 2015 Interim Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    5 Interim Work Plan Adopted by consensus September 5, 2014; comments from October committee discussions 1 Proposed additions from October TWC and RAP committee discussions in RED Topic Quarter 1 10/ 2014 - 12/2014 Quarter 2 01/2015- 03/2015 Quarter 3 04/2015 - 06/2015 Quarter 4 07/2015 - 09 2015 Committee Assignment (lead in Bold) Deferred Maintenance Plan Agency Lead: Kyle Rankin, DOE-RL Chief Engineer Action: Policy discussion Potential HAB Action: _____ Context: The status of structures on

  14. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 05.18.16 *Indicates lead committee 1 Hanford Advisory Board Fiscal Year Draft 2017 Work Plan (FY 2017 Action Overview) Topic Committee Assignment Potential FY 2017 Action/Product Action Q1 Q2 Q3 Q4 1. 100-N Proposed Plan RAP Advice [X] 2. Critical Infrastructure Updates *RAP/HSEP/TWC Advice [X] 3. PFP Progress *RAP/HSEP Agency briefing X 4. Sludge retrieval RAP Agency briefing X 5. WESF preparations to move capsules to dry storage RAP Agency briefing, advice [X] 6. Risk-based retrieval,

  15. Hanford Advisory Board Fiscal Year 2016 Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Updated 8/31/2016 * Indicates lead committee 1 Hanford Advisory Board Fiscal Year Draft 2017 Work Plan (FY 2017 Action Overview) Topic Committee Assignment Potential FY 2017 Action/Product Action Q1 Q2 Q3 Q4 1. 100-N Proposed Plan RAP Agency briefing, advice [x] 2. Sludge retrieval RAP Agency briefing x x 3. WESF preparations to move capsules to dry storage RAP Agency briefing, advice [x] 4. River Corridor updates RAP Agency briefing 5. Groundwater updates RAP Agency briefing x x x x 6. Central

  16. WIPP Facility Work Plan for Solid Waste Management Units

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-02-14

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  17. FY 95 engineering work plan for the design reconstitution implementation action plan

    SciTech Connect (OSTI)

    Bigbee, J.D.

    1994-11-09

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities, a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.

  18. Subsurface Site Characterization Work Plan for the Rulison Site, Colorado

    Office of Legacy Management (LM)

    Subsurface Site Characterization Work Plan for the Rulison Site, Colorado Controlled Copy No.: Revision No.: 0 October 2004 Approved for public release; further dissemination unlimited. DOE/NV--1009 Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering: http://www.ntis.gov/ordering.htm Available electronically at

  19. Hanford Advisory Board Fiscal Year 2015 Interim Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Fiscal Year 2015 Work Plan-Facilitator notes on midyear status for TWC-lead topics (10/22/15) Page 1 of 3 Topic Committee Assignment Potential FY 2015 Action/Product Context 6-Month Status (IM, Committee, Advice, Deferred, No Action) 6. Safety Culture Improvement Efforts TWC Informational Improvement actions in response to the June 2014 follow-up Assessment of Safety Culture - focusing on Office of River Protection (ORP) and the Waste Treatment and Immobilization Plant (WTP). Report anticipated

  20. Lesson Learned by Savannah River Site Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Bonnie Barnes, Savannah River Remediation. Work Planning and Control at Savannah River Remediation.

  1. In-well vapor stripping drilling and characterization work plan

    SciTech Connect (OSTI)

    Koegler, K.J.

    1994-03-13

    This work plan provides the information necessary for drilling, sampling, and hydrologic testing of wells to be completed in support of a demonstration of the in-well vapor stripping system. The in-well vapor stripping system is a remediation technology designed to preferentially extract volatile organic compounds (VOCs) from contaminated groundwater by converting them to a vapor phase. Air-lift pumping is used to lift and aerate groundwater within the well. The volatiles escaping the aerated water are drawn off by a slight vacuum and treated at the surface while the water is allowed to infiltrate the vadose zone back to the watertable.

  2. Final work plan : environmental site investigation at Sylvan Grove, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.

    2012-07-15

    In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining

  3. Office of Enterprise Assessments Targeted Review of Work Planning...

    Office of Environmental Management (EM)

    ... ideas, consider safe solutions to problems, and use the collective experience ... hazmat security plans; and emergency response planning as required in 49 CFR 173. There ...

  4. UMTRA Project Site Observational Work Plan, Mexican Hat, Utah

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    Surface cleanup activities at the Mexican Hat UMTRA processing site are nearing completion. Ground Water contamination at the Mexican Hat site is a result of uranium milling operations. The extent of residual process water has been identified, and it is limited to the uppermost aquifer in the vicinity of the site. Deeper aquifers are not affected because of an upward hydraulic gradient and the presence of a confining unit (the deeper aquifers are protected by hydrogeologic isolation). The uppermost unit is returning to its pre-milling, mainly unsaturated state. The unit that contains the contaminated water is not a ground water resource because it qualifies as Class III (limited use) based on limited yield. Ground water in the uppermost unit is currently not used and is not anticipated to be used as a ground water resource. The nearby San Juan River and a converted oil exploration well provide all of the water needs for the area. There are no current threats to human health or livestock; and, because the zone of contamination does not represent a ground water resource, none are anticipated in the future. There are, however, seeps where contaminated water is exposed at land surface. The seeps create potential exposure pathways for plants and wildlife. It is not known at this time if there is a risk to the environment. Additional investigations are needed and are described in this document to confirm the presence or absence of potential environmental risks. Additional hydrogeologic investigations are not required. The proposed ground water compliance strategy for the site is no remediation, because the ground water in the uppermost aquifer (which is also the zone of contamination) qualifies for supplemental standards based on Class III, limited yield, and because there are no threats to human health. Domestic and agricultural water is pumped from a deeper aquifer that is isolated from the contaminated zone.

  5. TWRS privatization phase I - site characterization and environmental baseline work plan

    SciTech Connect (OSTI)

    Reidel, S.P.; Hodges, F.N., Westinghouse Hanford

    1996-08-27

    This work plan defines the steps necessary to develop a Site Characterization Plan and Environmental Baseline for the TWRS Privatization Phase I area. The Data Quality Objectives Process will be the primary tool used to develop these plans.

  6. Interim measure work plan/design for Agra, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2008-11-18

    This Interim Measure Work Plan/Design (IMWP/D) is supplemental to the Argonne document Interim Measure Conceptual Design for Remediation of Source Area Contamination at Agra, Kansas. The IMWP/D includes information required by Kansas Department of Health and Environment (KDHE) Policy BER-RS-029, Policy and Scope of Work for Interim Measures. Specific to Policy BER-RS-029 is the requirement for several documents that will ensure that an adequate amount and type of data are collected for implementation of the IMWP/D and that data quality and safe conditions are prevailed. Such information is included in the IMWP/D as follows: Appendix A: Data Acquisition Plan--Design Testing Requirements; Appendix B: Basis of Design; Appendix C: Permits; Appendix D: Quality Assurance Project Plan; Appendix E: Health and Safety Plan; and Appendix F: Operations, Maintenance, and Monitoring Schedule. The proposed remedial technology for this project is the installation of five large-diameter boreholes (LDBs) in a source area that has been identified on the property formerly used for grain storage by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The goal of the LDB technology is the remediation of the source area by removal of mass quantities of contaminated soil from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. Secondary to the soil remediation is the remediation of groundwater at and adjacent to the source areas. The LDB technology serves the following purposes: (1) The physical removal of contaminated soil from the identified source area. (2) Replacement of less permeable native materials (silty clay, clayey silt, and silty sand) with more permeable materials to facilitate the capture of volatilized contaminants in the vertical borehole. (3) Removal of contaminants volatilized by air sparging (AS) and extracted from the

  7. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1987-10-01

    The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

  8. Remedial Action Work Plan Amchitka Island Mud Pit Closures

    SciTech Connect (OSTI)

    DOE/NV

    2001-04-05

    This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

  9. Technical Work Plan For: Meteorological Monitoring Data Analysis

    SciTech Connect (OSTI)

    R. Green

    2006-02-06

    The meteorological monitoring and analysis program has five objectives. (1) Acquire qualified meteorological data from YMP meteorological monitoring network using appropriate controls on measuring and test equipment. Because this activity is monitoring (i.e., recording naturally occurring events) pre-test predictions are not applicable. All work will be completed in accordance with U.S. Department of Energy (DOE) Office of Repository Development (ORD) administrative procedures and Bechtel SAIC Co., LLC (BSC) line procedures. The meteorological monitoring program includes measuring and test equipment calibrations, operational checks, preventive and corrective maintenance, and data collection. (2) Process the raw monitoring data collected in the field and submit technically reviewed, traceable data to the Technical Data Management System (TDMS) and the Records Processing Center. (3) Develop analyses or calculations to provide information to data requesters and provide data sets as requested. (4) Provide precipitation amounts to Site Operations to support requirements to perform inspections in the Stormwater Pollution Prevention Plan (implemented in LP-OM-050Q-BSC) following storm events of greater than 0.5 inches. The program also provides meteorological data during extreme weather conditions (e.g., high winds, rainstorms, etc.) to support decisions regarding worker safety. (5) Collect samples of precipitation for chemical and isotopic analysis by the United States Geological Survey (USGS). The BSC ES&H Environmental Compliance organization is responsible for performing this work. Data from calendar-year periods are submitted to the TDMS to provide YMP users with qualified meteorological data for scientific modeling and analyses, engineering designs of surface facilities, performance assessment analyses, and operational safety issues.

  10. Final work plan for targeted investigation at Hilton, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2007-08-28

    This Work Plan outlines the scope of a targeted investigation to update the status of carbon tetrachloride contamination in groundwater associated with grain storage operations at Hilton, Kansas. The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility in Hilton during the 1950s and 1960s. At the time of the CCC/USDA operation in Hilton, grain storage facilities (CCC/USDA and private) were located along the both sides of the former Union Pacific railroad tracks (Figure 1.1). The main grain storage structures were on or near the railroad right-of-way. The proposed targeted investigation, to be conducted by Argonne National Laboratory on the behalf of CCC/USDA, will supplement Argonne's Phase I and Phase II investigations in 1996-1997. The earlier investigations erroneously focused on an area east of the railroad property where the CCC/USDA did not operate, specifically on a private grain storage facility. In addition, the investigation was limited in scope, because access to railroad property was denied (Argonne 1997a,b). The hydrogeologic system at Hilton is potentially complex.

  11. US - Brazil Binational Energy Working Group Joint Action Plan...

    Broader source: Energy.gov (indexed) [DOE]

    brazilactionplan7202010.pdf More Documents & Publications U.S.-Brazil Binational Joint Action Plan Webtrends Archives by Fiscal Year - International Activities EIS-0309: Record...

  12. Quality Work Plan Inspection and Monitoring Requirement | Department...

    Energy Savers [EERE]

    to the U.S. Department of Energy meets quality guidelines required by the WAP. The Grantee must provide in their Grantee Plan a policy for validation of the QCI credentials. ...

  13. Liquid effluents program FY 1997 multi-year work plan

    SciTech Connect (OSTI)

    Green, F.T.

    1996-09-30

    This document provides the technical baseline and work breakdown structure for the liquid effluents program.

  14. Site Characterization Work Plan for Gasbuggy, New Mexico

    SciTech Connect (OSTI)

    DOE/NV

    2000-12-14

    Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation activities

  15. R&D Plan for the High Temperature Membrane Working Group | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy R&D Plan for the High Temperature Membrane Working Group R&D Plan for the High Temperature Membrane Working Group Summary of challenges, approaches and technical targets for HFCIT's High Temperature Membrane Working Group. htwg_rd_plan.pdf (459.89 KB) More Documents & Publications Table I: Technical Targets for Catalyst Coated Membranes (CCMs): Automotive Table III: Technical Targets for Catalyst Coated Membranes (CCMs): Stationary Table IV: Technical Targets for

  16. Status Update on Action 2a: Implementation Handbook for Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by James Winter, NA-00-10. DOE Handbook: Implementing Activity-Level Work Planning & Control at Nuclear Facilities. Project Justification Statement submitted 1-29-13, with focus upon improved implementation of WP&C and activity-level work. Provides the background, project plan, and key elements of a new DOE handbook on implementing activity-level work planning and control at DOE nuclear facilities.

  17. Nevada Site Specific Advisory Board Tackles New Work Plans, Looks to Future

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Specific Advisory Board Tackles New Work Plans, Looks to Future Nevada Site Specific Advisory Board Tackles New Work Plans, Looks to Future October 29, 2015 - 12:15pm Addthis NSSAB members get a briefing on groundwater characterization elements during a tour of the Nevada National Security Site. NSSAB members get a briefing on groundwater characterization elements during a tour of the Nevada National Security Site. NSSAB members vote on work plan tasks for fiscal year

  18. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: DWP Summary, Volume 1

    SciTech Connect (OSTI)

    Project Integration

    2005-09-26

    This detailed work plan provides the scope, cost, and schedule for the Fiscal Year 2006 activities required to support River Corridor cleanup objectives within the directed guidance.

  19. Microsoft Word - FY13_EMR_Committee_Work_Plan_Final_Draft

    Office of Environmental Management (EM)

    Approved Sept. 26, 2012 1 Northern New Mexico Citizens' Advisory Board (NNMCAB) ENVIRONMENTAL MONITORING and REMEDIATION COMMITTEE 2013 Work Plan SECTION I. MISSION STATEMENT...

  20. Lesson Learned by Lawrence Livermore National Laboratory Activity-level Work Planning and Control

    Office of Energy Efficiency and Renewable Energy (EERE)

    Slide Presentation by Donna J. Governor, Lawrence Livermore National Laboratory. Lessons Learned by Lawrence Livermore National Laboratory Activity-Level Work Planning & Control.

  1. Papua New Guinea-ClimateWorks Low Carbon Growth Planning Support...

    Open Energy Info (EERE)

    Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policiesdeployment...

  2. Enterprise Assessments Targeted Review of Work Planning and Control...

    Broader source: Energy.gov (indexed) [DOE]

    Management EPC Engineering, Projects, and Construction ESQ Environmental Safety and Quality FR Facility Representative FWS Field Work Supervisor FY Fiscal Year GHA General...

  3. Work plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect (OSTI)

    Not Available

    1989-12-01

    The primary objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation doses that populations could have received from nuclear operations at the Hanford Site since 1944, with descriptions of uncertainties inherent in such estimates. The secondary objective is to make project records--information that HEDR staff members used to estimate radiation doses--available to the public. Preliminary dose estimates for a limited geographic area and time period, certain radionuclides, and certain populations are planned to be available in 1990; complete results are planned to be reported in 1993. Project reports and references used in the reports are available to the public in the DOE Public Reading Room in Richland, Washington. Project progress is documented in monthly reports, which are also available to the public in the DOE Public Reading Room.

  4. DOE OIG Recovery Act Work Plan (FY 2011).xls

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    OIG Recovery Act Plan Overview OIG Name: Department of Energy Office of Inspector General OIG Broad Recovery Act Goals: The primary objective of the Office of Inspector General's oversight strategy involves the implementation of a review, evaluation, and investigation protocol designed to assist the Department of Energy in: (1) maximizing the performance and effectiveness of activities related to the Recovery Act; (2) preventing and detecting the fraudulent misuse of Recovery Act funds; and (3)

  5. Lesson Learned by Environmental Management Complex-wide Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office. Office of Environmental Management Work Planning and Control Oversight. Contractor Good Practices and DOE EM Good Practices.

  6. Guidelines for Process and Development of Annual HAB Work Plan...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    members and agencies, but not timely. Place in holding bin until timely, or use as agenda filler. A new topic is supported by committee members and agencies. Define new work...

  7. Incorporating ecological risk assessment into remedial investigation/feasibility study work plans

    SciTech Connect (OSTI)

    Not Available

    1994-06-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

  8. Enterprise Assessments Targeted Review of Work Planning and Control at the Hanford Central Plateau Environmental Remediation Projects- June 2015

    Broader source: Energy.gov [DOE]

    Targeted Review of Work Planning and Control at the Hanford Central Plateau Environmental Remediation Projects

  9. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    SciTech Connect (OSTI)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

  10. WPN 15-4: Quality Work Plan Requirement Update | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    4: Quality Work Plan Requirement Update WPN 15-4: Quality Work Plan Requirement Update Effective: Oct. 21, 2014 This guidance provides updates to WPN 14-4 issued Dec. 2, 2013. It supersedes 14-4 and describes requirements to support and verify quality work in the U.S. Department of Energy's (DOE's) Weatherization Assistance Program (WAP). It defines what constitutes a quality installation of weatherization measures, outlines how those measures are inspected and validated, and prescribes

  11. Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development

    Broader source: Energy.gov [DOE]

    Slide Presentation by Rich Davies, Kami Lowry, Mike Schlender, Pacific Northwest National Laboratory (PNNL) and Ted Pietrok, Pacific Northwest Site Office (PNSO). Integrated Safety Management System as the Basis for Work Planning and Control for Research and Development. Work Planning and Control (WP&C) is essential to assuring the safety of workers and the public regardless of the scope of work Research and Development (R&D) activities are no exception.

  12. WPN 15-4: QUALITY WORK PLAN REQUIREMENT UPDATE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    5-4: QUALITY WORK PLAN REQUIREMENT UPDATE WPN 15-4: QUALITY WORK PLAN REQUIREMENT UPDATE Effective October 21, 2014: This guidance provides updates to WPN 14-4 issued December 2, 2013. This guidance supersedes 14-4 and describes requirements to support and verify quality work in the Department of Energy's (DOE) Weatherization Assistance Program (WAP). It defines what constitutes a quality installation of weatherization measures, outlines how those measures are inspected and validated, and

  13. Single-shell tank closure work plan. Revision A

    SciTech Connect (OSTI)

    1995-06-01

    In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

  14. Technical Work Plan For: Meteorological Monitoring and Data Analysis

    SciTech Connect (OSTI)

    C.T. Bastian

    2003-03-28

    The meteorological monitoring and analysis program has three overall objectives. First, the program will acquire qualified meteorological data from monitoring activities in the Environmental Safety and Health (ES&H) network, including appropriate controls on measuring and test equipment. All work will be completed in accordance with U.S. Department of Energy (DOE) Office of Repository Development (ORD) administrative procedures and Bechtel SAIC Co., LLC (BSC) line procedures. The continuously operating monitoring program includes measuring and test equipment calibrations, operational checks, preventive and corrective maintenance, and data collection. Second, the program will process the raw monitoring data collected in the field and submit technically reviewed, traceable data to the Technical Data Management System (TDMS) and the Records Processing Center. Third, reports containing analyses or calculations could be created to provide information to data requesters.

  15. DRAFT Letter, PW 1/3/6 RD/RA Work Plan 1/19/16

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Letter, PW 1/3/6 RD/RA Work Plan 1/19/16 RAP Committee: Draft Letter: Remedial Design/Remedial Action (RD/RA) Work Plan for the 200-CW-5, 200- PW-1, PW-3, PW-6 Operable Units, DOE/RL-2015-23 (Draft B). Page 1 of 1 Draft HAB Letter: Remedial Design/Remedial Action (RD/RA) Work Plan for the 200- CW-5, 200-PW-1, PW-3, PW-6 Operable Units, DOE/RL-2015-23 (Draft B). Issue Managers: Engstrom, Hudson, Niles, Cimon, Mattson To: Stacy and Dennis Cc: Ecology and DOE HQ (Monica), Bertrand Recognizing that

  16. DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy OE National SCADA Test Bed Fiscal Year 2009 Work Plan DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan This document is designed to help guide and strengthen the DOE/OE NSTB program's research and development (R&D) of advance security tools and to heighten awareness among energy sector partners of the more than 30 NSTB projects underway in FY2009. DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan (260.95 KB) More Documents & Publications National SCADA Test

  17. Microsoft Word - 2011_1012_RAP_SixMonth_WorkPlan.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 12, 2011 Page 1 of 1 RIVER & PLATEAU COMMITTEE - 6 MONTH WORK PLAN November (No committee meeting) December (1.5 days, 6, 7, 8 flexibility) * Issue manager table update * Site wide permit (IM and Ecology update)/COTW planning * CERCLA Cumulative Risk Assessment * 100-K Proposed Plan (path forward)/ River Corridor Decisions / Insitu Technologies for 100 K Preferred Remedy * 618-10 and 11 Update (include characterization of bottles); presentation * Remediation options for 324 Building

  18. Work plan addendum for the remedial investigation and feasibility study of the Salmon Site

    SciTech Connect (OSTI)

    1995-11-01

    This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and (8) Reference. This addendum will identify changes to the original work plan that are necessary because of additional information acquired at the SS. This document is not intended to replace the work plan, rather, it is intended to focus the remaining work in the context of additional site knowledge gained since the development of the original work plan. The U.S. Department of Energy (DOE) is conducting a focused and phased site characterization as a part, of the RI/FS. The RI/FS is the methodology under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) for evaluating hazardous waste sites on the National Priorities List (NPL). The SS is not listed on the NPL, but DOE has voluntarily elected to conduct the evaluation of the SS in accordance with CERCLA.

  19. Westinghouse Hanford Company Codes and Standards Compliance Program: Fiscal Year 1994 Work Plan. Revision 1

    SciTech Connect (OSTI)

    Moist, S.L.

    1994-05-01

    This FY Work Plan (FYWP) applies to facilities at the Hanford Site under the management of WHC and the Hanford site S/RID. Project management plans will be developed for each facility/activity to document the specific technical and administrative controls for S/RID development and S/R implementation assessments.

  20. Lessons Learned in Optimizing Workers' and Worker Representatives' Input to Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Tom McQuiston, Dr. P.H., United Steelworkers - Tony Mazzocchi Center for Health, Safety and Environmental Education. Lessons Learned in Optimizing Workers’ and Worker Representatives’ Input in Work Planning and Control.

  1. Analysis of ISM Activity-level Work Planning and Control Within...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Analysis of ISM Activity-level Work Planning and Control Within DOE May 15, 2013 Presenter: Stephen L. Domotor, Office of Analysis, Office of Health, Safety and Security Topics ...

  2. Contractor Work Planning and Control Lessons Learned from DOE and International Projects

    Broader source: Energy.gov [DOE]

    Slide Presentation by Bob McQuinn; URS Global Management and Operations Services; Frank McCoy and Rick Runnels; URS - Professional Solutions. Contractor Work Planning and Control-URS Lessons Learned.

  3. 2007 Long Range Plan Working Group Members | U.S. DOE Office of Science

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (SC) 7 Long Range Plan Working Group Members Nuclear Science Advisory Committee (NSAC) NSAC Home Meetings NSAC Members Charges/Reports Charter .pdf file (78KB) NP Committees of Visitors Federal Advisory Committees NP Home NSAC Members 2007 Long Range Plan Working Group Members Print Text Size: A A A FeedbackShare Page Beise, Elizabeth University of Maryland Merninga, Lia TJNAF Bryman, Douglas TRIUMF Meyer, Curtis Carnegie Mellon University Burrows, Adam University of Arizona Meziani,

  4. RFI/RI work plan for the Road A Chemical Basin 904-111G

    SciTech Connect (OSTI)

    Kmetz, T.F.

    2000-03-07

    This Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Remedial Investigation (RI) Work Plan has been prepared for the Road A Chemical Basin Operable Unit (RdACB OU) (904-111G). This unit is subject to the requirements of both RCRA and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). This Work Plan presents the initial evaluation of existing unit data, applicable background data, the regulatory framework for the unit investigation, and the evaluations and decisions made during the determination of the scope and objectives of the planned Remedial Investigation/Feasibility Study (RI/FS) activities.

  5. Lessons Learned at the Nevada National Security Site Implementing the EFCOG Activity-level Work Planning and Control Guide

    Broader source: Energy.gov [DOE]

    Slide Presentation by Steele Coddington, Work Planning Manager, National Security Technologies, Nevada National Security Site. Lessons Learned Implementing Work Planning & Control. 6 Step Process for improving WP&C.

  6. Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2007-02-02

    This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

  7. Ecological risk assessment guidance for preparation of remedial investigation/feasibility study work plans

    SciTech Connect (OSTI)

    Pentecost, E.D.; Vinikour, W.S.

    1993-08-01

    This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial assessment investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfired Amendments and Reauthorization Act of 1986 (SARA), an RI/FS work plan win have to be developed as part of the site-remediation scoping the process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites. An overview analysis of early ecological risk assessment methods (i.e., in the 1980s) at Superfund sites was conducted by the EPA (1989a). That review provided a perspective of attention given to ecological issues in some of the first RI/FS studies. By itself, that reference is of somewhat limited value; it does, however, establish a basis for comparison of past practices in ecological risk with current, more refined methods.

  8. R&D Plan for the High Temperature Membrane Working Group

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    R&D Plan for the High Temperature Membrane Working Group Introduction/Background The High Temperature Membrane Working Group was established to provide a forum for greater interaction in the effort to develop high temperature membranes for PEM fuel cells. The goal of this effort is particularly challenging and requires significant fundamental research and development. The Working Group meets twice a year (immediately before or after the Electrochemical Society meeting) and includes

  9. Hanford Site Environmental Restoration Program 1994 fiscal year work plan. Work breakdown structure 2.0: Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-12-22

    Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).

  10. Final work plan : investigation of potential contamination at the former USDA facility in Ramona, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.

    2006-01-27

    This Work Plan outlines the scope of work that will be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Ramona, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential source areas on the property, (2) determine the vertical and horizontal extent of potential contamination, and (3) provide recommendations for future actions, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the United States Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Research Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy. Under the Intergovernmental Agreement, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne has issued a Master Work Plan (Argonne 2002) that describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. The Master Work Plan was approved by the KDHE. It contains materials common to investigations at locations in Kansas and should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Ramona.

  11. WPN 14-4: Quality Work Plan Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Archived 10/21/14, Superseded by WPN 15-4 This guidance describes requirements to support and verify quality work in the U.S. Department of Energy (DOE) Weatherization Assistance Program (WAP). It defines what constitutes a quality installation of weatherization measures, outlines how those measures are inspected and validated, and defines acceptable training and credentialing of workers. WPN 14-4: Quality Work Plan Requirement (592.96

  12. Environmental support FY 1995 multi-year program plan/fiscal year work plan WBS 1.5.2/7.4.11

    SciTech Connect (OSTI)

    Moore, D.A.

    1994-09-01

    The multi-Year Program Plan (MYPP) is the programmatic planning baseline document for technical, schedule, and cost data. The MYPP contains data by which all work is managed, performed and controlled. The integrated planning process, defined by RL, is redicted on establishment of detailed data in the MYPP. The MYPP includes detailed information for the data elements including Level II critical path schedules, cost estimate detail, and updated technical data to be done annually. There will be baseline execution year and out year approval with work authorization for execution. The MYPP will concentrate on definition of the scope, schedule, cost and program element level critical path schedules that show the relationship of planned activities. The Fiscal Year Work Plan (FYWP) is prepared for each program to provide the basis for authorizing fiscal year work. The MYPP/FYWP will be structured into three main areas: (1) Program Overview; (2) Program Baselines; (3) Fiscal Year Work Plan.

  13. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site.

  14. Technical work plan for Surface Impoundments Operable Unit engineering support studies

    SciTech Connect (OSTI)

    1995-11-01

    This document provides a comprehensive work plan which, when utilized as a data collection guide for field activities, will provide the necessary information required to complete a report on geotechnical properties of the sediments contained in the Surface Impoundments Operable Unit at Oak Ridge National Laboratory in Oak Ridge, Tennessee. Detailed guidance is provided for the following activities: collection of samples from the impoundments; compressive strength testing of the raw sediments; compressive strength testing of the structurally modified (lime and cement additives) sediments; testing for sediment physical properties and settling rates; testing for sediment dewatering characteristics; testing for radiation activity during the field work; testing for polymer additions that may enhance settling. The work plan additionally provides guidance and examples for the preparation of documents necessary to establish readiness for safe and satisfactory performance of the field activities. An outline for the format requested for a report of these data is also provided.

  15. Work plan addendum for David Witherspoon, Inc., 901 Site Building Characterization, Knoxville, Tennessee

    SciTech Connect (OSTI)

    1997-01-01

    This building characterization plan was developed as an addendum to the existing site characterization work plan documents, which are in Appendix B of the David Witherspoon, Inc., (DWI) preliminary remedial investigation (RI)/feasibility study (FS). All building characterization activities will be conducted in accordance with the rules of the Hazardous Substance Remedial Action Program under the direction of the Tennessee Department of Environment and Conservation, Division of Superfund (TN Rules 1200-1-3) and its implementing regulations. Additional rules of the state of Tennessee, Comprehensive Environmental Response, Compensation, and Liability Act of 1980, and the U.S. Environmental Protection Agency guidance were consulted during development of this plan. Activities at the DWI site were concerned with scrap metal processing and scrap metal resale.

  16. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-03-05

    This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable

  17. WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern

    SciTech Connect (OSTI)

    Washington TRU Solutions LLC

    2002-03-05

    his 2002 Facility Work Plan (FWP) has been prepared as required by Module VII,Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received onDecember 6, 2000 (NMED, 2000a). This February 2002 FWP describes the program-matic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the mostrecent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA)Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may beused for any SWMU or AOC (NMED, 1998). This accelerated approach is used toreplace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to

  18. Engineering work plan for tank 241-C-103 vapor phase characterization (ECN 613188). Revision 1

    SciTech Connect (OSTI)

    Conrad, R.B.

    1994-10-05

    The tasks described by this work plan have been completed. The purpose of this revision it to document what actually occurred during the performance of this work plan. The scope was and is limited to phases 1 and 2 as described in the program plan, revision 1. Phases 1 and 2 include the tank 241-C-103 (C-103) vapor. For economic and as low as reasonably achievable (ALARA) reasons, we will limit our scope to characterize the C-103 vapor phase for the categories that could be expected to impact facility worker safety from a toxicological and flammability standpoint. In anticipation that a vapor treatment system may be required, categories necessary for design will also be included. It will be the intent of the C-103 vapor characterization program to: (1) identify the substances from the above list of categories that are applicable to the issues involving C-103, and (2) implement a phased plan which will develop the organic vapor phase characterization method and then characterize the organics and the other selected substances to the required quantitative certainty.

  19. Fiscal year 1990 Rocky Flats Plant Environmental Restoration program Current-Year Work Plan

    SciTech Connect (OSTI)

    Nielsen, T. ); Waage, E.; Miller, D. Corp., Boulder, CO )

    1990-01-01

    The Rocky Flats Plant (RFP) is a nuclear weapons manufacturing facility currently operated by EG G for the US Department of Energy (DOE). RFP is located at the foot of the Rocky Mountains in Jefferson Country, Colorado. The Fiscal Year 1990 (FY90) Current-Year Work Plan (CYWP) is intended to serve as a guidance document for the Environmental Restoration (ER) and RCRA Compliance programs that will be implemented at RFP. The CYWP provides in one document any cross-references necessary to understand the interrelationships between the CYWP and the DOE Five-Year Plan (FYP), Site-Specific Plan (SSP), and other related documents. The scope of this plan includes comparison of planned FY90 ER activities to those actually achieved. The CYWP has been updated to include Colorado Department of Health (CDH), US Environmental Protection Agency (EPA), and DOE Inter-Agency Agreement ER activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. The CYWP also addresses facilities and sites contaminated with or used in management of those wastes.

  20. Microsoft Word - 2014_1008_TWC_ThreeMonth_WorkPlan.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    10/8/14 Facilitator notes in blue November Committee meeting placeholder: Thursday, November 13 Call placeholder: Tuesday, November 18, 3:00 p.m. December Committee meeting placeholder: Wednesday, December 10 Call placeholder: Tuesday, December 16, 3:00 p.m. January Committee meeting placeholder: Wednesday, January 7 Call placeholder: Tuesday, January 13, 3:00 p.m. Tank Farm Vapor Issues (joint with HSEP) Direct Feed LAW HOLDING BIN Topic On HAB 2014 Work Plan? Timeframe? Alternative vessel

  1. Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

  2. Site planning and integration fiscal year 1999 multi-year work plan (MYWP) update for WBS 1.8.2.1

    SciTech Connect (OSTI)

    SCHULTZ, E.A.

    1998-10-01

    The primary mission of the Site Planning and Integration (SP and I) project is to assist Fluor Daniel Project Direction to ensure that all work performed under the Project Hanford Management Contract (PHMC) is adequately planned, executed, controlled, and that performance is measured and reported in an integrated fashion. Furthermore, SP and I is responsible for the development, implementation, and management of systems and processes that integrate technical, schedule, and cost baselines for PHMC work.

  3. Work plan for the Oak Ridge National Laboratory groundwater program: Continuous groundwater collection

    SciTech Connect (OSTI)

    NONE

    1995-08-01

    The continuous collection of groundwater data is a basic and necessary part of Lockeheed Martin Energy Systems` ORNL Environmental Restoration Area-Wide Groundwater Program. Continuous groundwater data consist primarily of continually recorded groundwater levels, and in some instances, specific conductivity, pH, and/or temperature measurements. These data will be collected throughout the ORNL site. This Work Plan (WP) addresses technical objectives, equipment requirements, procedures, documentation requirements, and technical instructions for the acquisition of the continuous groundwater data. Intent of this WP is to provide an approved document that meets all the necessary requirements while retaining the flexibility necessary to effectively address ORNL`s groundwater problems.

  4. Hanford Advisory Board FY2014 Work Plan - "A" List

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Advisory Board FY2014 Work Plan - "A" List These are the priority topics that the Board is expected to take action on in FY2014, as agreed to by the TPA and the Board. The timing of these topics drives the need for committee meetings. Their status may change to "topics of interest" if they are delayed or deferred, and if there is agreement to do so among the EIC and Agency Liaisons. 8/30/2013 v.6 Page 1 of 11 Priority Topics - "A" List Policy Level Issues

  5. Microsoft Word - 2014_0218_FY2014_HAB_WorkPlan_FINAL-UPDATED.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FY2014 Work Plan - "A" List These are the priority topics that the Board is expected to take action on in FY2014, as agreed to by the TPA and the Board. The timing of these topics drives the need for committee meetings. Their status may change to "topics of interest" if they are delayed or deferred, and if there is agreement to do so among the EIC and Agency Liaisons. Adopted by Consensus, September 6, 2013; Updated by consensus 2/18/14 Page 1 of 12 Priority Topics -

  6. Microsoft Word - 2014_0305_Graphic_PIC_ThreeMonth_WorkPlan.docx

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    03/05/14 during PIC meeting (Blue titles indicate those topics specifically identified in the 2014 HAB Work Plan) March April May RAD Primer (placeholder) o How workers are protected from exposure? o HSEP lead Public Understanding of... o Involving an informed public on issues like cleanup levels, waste streams and classifications, risk, budget, etc. o Check in with John Howieson & other issue managers on the tank waste classification FAQs (next step: Ken & Liz to set-up IM call) 100-F

  7. Microsoft Word - FY2014_HAB_WorkPlan_v6.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hanford Advisory Board FY2014 Work Plan - "A" List These are the priority topics that the Board is expected to take action on in FY2014, as agreed to by the TPA and the Board. The timing of these topics drives the need for committee meetings. Their status may change to "topics of interest" if they are delayed or deferred, and if there is agreement to do so among the EIC and Agency Liaisons. 8/30/2013 v.6 Page 7 of 11 Priority Topics - "A" List Policy Level Issues

  8. Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas

    SciTech Connect (OSTI)

    MCCARTHY, M.M.

    1999-08-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

  9. Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.

    SciTech Connect (OSTI)

    Burton, J. C.; Environmental Research

    2003-01-23

    The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic

  10. Site Specific Single Shell Tank (SST) phase 1 RFI and CMS Work Plan Addendum for Waste Management B-BX-BY

    SciTech Connect (OSTI)

    ROGERS, P.M.

    2000-05-19

    This site-specific work plan addendum for WMA B-BX-BY addresses vadose zone characterization plans for collecting and analyzing sediment samples.

  11. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

  12. Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri

    SciTech Connect (OSTI)

    1995-08-01

    US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure.

  13. Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2

    SciTech Connect (OSTI)

    Dail, J.L.; Nanstad, L.D.; White, R.K.

    1995-06-01

    This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ``scores`` and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process.

  14. Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 1

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 1 contains a discussion of the chemical safety improvements planned or already underway at DOE sites to correct facility or site-specific vulnerabilities. The main part of the report is a discussion of each of the programmatic deficiencies; a description of the tasks to be accomplished; the specific actions to be taken; and the organizational responsibilities for implementation.

  15. Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1

    SciTech Connect (OSTI)

    1995-09-01

    This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

  16. The Removal Action Work Plan for CPP-603A Basin Facility

    SciTech Connect (OSTI)

    B. T. Richards

    2006-06-05

    This revised Removal Action Work Plan describes the actions to be taken under the non-time-critical removal action recommended in the Action Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center, as evaluated in the Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center. The regulatory framework outlined in this Removal Action Work Plan has been modified from the description provided in the Engineering Evaluation/Cost Analysis (DOE/NE-ID-11140, Rev. 1, August 2004). The modification affects regulation of sludge removal, treatment, and disposal, but the end state and technical approaches have not changed. Revision of this document had been delayed until the basin sludge was successfully managed. This revision (Rev. 1) has been prepared to provide information that was not previously identified in Rev. 0 to describe the removal, treatment, and disposal of the basin water at the Idaho National Laboratory (INL) CERCLA Disposal Facility evaporation ponds and fill the basins with grout/controlled low strength material (CLSM) was developed. The Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center - conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act - evaluated risks associated with deactivation of the basins and alternatives for addressing those risks. The decision to remove and dispose of the basin water debris not containing uranium grouted in place after the sludge has been removed and managed under the Hazardous Waste Management Act/Resource Conservation and Recovery Act has been documented in the Act Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center.

  17. Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    SAIC

    2011-04-01

    The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010, and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.

  18. Site observational work plan for the UMTRA Project Site at Tuba City, Arizona

    SciTech Connect (OSTI)

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency`s Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd{sup 3}) (1,100,000 cubic meters [m{sup 3}]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. A total of 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. Two processes were used to refine the ore: an acid leach process and a sodium carbonate alkaline process. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The preliminary ground water compliance strategy at the Tuba City site is active remediation. The specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource.

  19. Site observational work plan for the UMTRA Project site at Tuba City, Arizona

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    The requirements for ground water compliance for Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Tuba City, Arizona, site, are found in the Uranium Mill Tailings Radiation Control Act; Subparts B and C of the U.S. Environmental Protection Agency`s Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR 192 (1994)), and the associated proposed 1987 standards (52 FR 36000). During the surface remedial action, an estimated 1,400,000 cubic yards (yd{sup 3}) (1,100,000 cubic meters [m{sup 3}]) of uranium mill tailings and other contaminated materials were consolidated and stabilized in place in an unlined disposal cell covering 50 acres (20 hectares). The surface remedial action was completed in April 1990. Ground water beneath the Tuba City site was contaminated by subsurface migration of water from uranium ore processing activities. The main source of contaminants was water from the tailings piles that began in 1956 when the mill opened and ended in 1966 when the mill closed. 800,000 tons (725,000 tonnes) of uranium ore were processed onsite over a 10-year period. The wet tailings remaining after processing were placed as a slurry in three piles at the site. Water from these tailings then seeped into the ground and migrated downward to the ground water. The Tuba City site is currently in a post-stabilization, prelicensing status. The site is expected to remain in this status until licensed by the U.S. Nuclear Regulatory Commission (NRC) for long-term surveillance and maintenance. The preliminary ground water compliance strategy at the Tuba City site is active remediation-specific technology to be evaluated is in situ bioremediation. This selection was made because of the potential ability of bioremediation to reduce concentrations to lower levels than a conventional extraction system and to minimize disturbance of the water resource.

  20. Engineering work plan for implementing the Process Condensate Recycle Project at the 242-A evaporator

    SciTech Connect (OSTI)

    Haring, D.S.

    1995-02-02

    The 242-A Evaporator facility is used to reduce the volume of waste stored in the Hanford double shell tanks. This facility uses filtered raw water for cooling, de-entrainment pad sprays, pump seal water, and chemical tank make-up. Some of these uses result in the introduction of filtered raw water into the process, thus increasing the volume of waste requiring evaporation and subsequent treatment by the 200 East Effluent Treatment Facility. The pump seal water and the de-entrainment pad spray systems were identified as candidates for a waste minimization upgrade. This work plan describes the activities associated with the design, installation, testing and initial operation of the process condensate recycle system. Implementation of the process condensate recycle system will permit the use of process condensate in place of raw water for the de-entrainment pad sprays and pump seals. This will reduce the amount of low-level liquid waste and generated during facility operation through source reduction and recycling.

  1. Operable Unit 7-13/14 in situ thermal desorption treatability study work plan

    SciTech Connect (OSTI)

    Shaw, P.; Nickelson, D.; Hyde, R.

    1999-05-01

    This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA.

  2. Engineering Work Plan for Development of Sludge Pickup Adapter for Fuel Cleanliness Inspections

    SciTech Connect (OSTI)

    PITNER, A.L.

    2000-01-06

    The plan for developing an adapter to suction up sludge into a calibrated tube for fuel cleanliness inspection activities is described. A primary assessment of fuel cleanliness to be performed after processing through the Primary Cleaning Machine is whether the volume of any remaining canister sludge in or on a fuel assembly exceeds the allowable 14 cm{sup 3} limit. It is anticipated that a general visual inspection of the sludge inventory after fuel assembly separation will usually suffice in making this assessment, but occasions may arise where there is some question as to whether or not the observed quantity of sludge exceeds this limit. Therefore a quantitative method of collecting and measuring the sludge volume is needed for these borderline situations. It is proposed to develop an adapter that fits on the end of the secondary cleaning station vacuum wand that will suction the material from the sludge collection tray into a chamber marked with the limiting volume to permit a direct go/no-go assessment of the sludge quantity.

  3. Project W-236A, work plan for preparation of a design requirements document

    SciTech Connect (OSTI)

    Groth, B.D.

    1995-01-30

    This work plan outlines the tasks necessary, and defines the organizational responsibilities for preparing a Design Requirements Document (DRD) for project W-236A, Multi-Function Waste Tank Facility (MWTF). A DRD is a Systems Engineering document which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This system element is usually assigned to a specific project, in this case the MWTF. The DRD is the document that connects the TWRS program requirements with the highest level projects requirements and provides the project`s link to the overall TWRS mission. The MWTF DRD effort is somewhat unique in that the project is already in detailed design, whereas a DRO is normally prepared prior to preliminary design. The MWTF design effort was initiated with a Functional Design Criteria (FDC) and a Supplemental Design Requirements Document (SDRD) bounding the high level requirements. Another unique aspect of this effort is that some of the TWRS program requirements are still in development. Because of these unique aspects of the MWTF DRD development, the MWTF will be developed from existing TWRS Program requirements and project specific requirements contained in the FDC and SDRD. The following list describes the objectives of the MWTF DRD: determine the primary functions of the tanks through a functional decomposition of the TWRS Program high level functions; allocate the primary functions to a sub-system architecture for the tanks; define the fundamental design features in terms of performance requirements for the system and subsystems; identify system interfaces and design constraints; and document the results in a DRD.

  4. Site Characterization Work Plan for Gnome-Coach Site, New Mexico

    SciTech Connect (OSTI)

    DOE /NV

    2001-02-13

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective

  5. Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)

    SciTech Connect (OSTI)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office

    2002-01-14

    Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

  6. Reducing the impact of chemical releases: U.S. Steel Clairton Works` Early Warning Plan

    SciTech Connect (OSTI)

    York, R.G.; Hart, C.M.; Graeser, W.C.

    1995-12-01

    The Early Warning Plan (EWP) is a program designed to alert plant personnel to a release of contaminants to a receiving stream before it becomes significant enough to impinge on the environment or the public. It also provides a method of written documentation of any discharge of contaminants so that rapid corrective action can be taken. The EWP includes procedures for monitoring, rapid analytical turnaround, on-site analysis, statistical process control evaluation, and follow-up investigation. It is related to, but separate from other emergency response plans for the Clairton complex. The plant also uses a Spill Prevention, Control, and Countermeasure Plan (SPCC), an Environmental Emergency Response Plan (EERP), an Oil Pollution Act (OPA) Response Plan, and an EPA Facility Response Plan. Major spills and response activities are described in these other plans, but the EWP has served to concentrate on day-to-day plant operations. The paper discusses the driving forces behind the Plan, the EWP, and results of the program after nearly 10 years of operation.

  7. Enterprise Assessments Lessons Learned From Targeted Reviews of Activity-Level Work Planning and Control … March 2016

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lessons Learned From Targeted Reviews of Activity-Level Work Planning and Control March 2016 Office of Worker Safety and Health Assessments Office of Environment, Safety and Health Assessments Office of Enterprise Assessments U.S. Department of Energy i Table of Contents Acronyms ...................................................................................................................................................... ii Executive Summary

  8. Enterprise Assessments Targeted Review of Work Planning and Control at the Nevada National Security Site … October 2015

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Targeted Review of Work Planning and Control at the Nevada National Security Site October 2015 Office of Worker Safety and Health Assessments Office of Environment, Safety and Health Assessments Office of Enterprise Assessments U.S. Department of Energy i Table of Contents Acronyms ...................................................................................................................................................... ii Executive Summary

  9. Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas

    SciTech Connect (OSTI)

    ROGERS, P.M.

    2000-06-01

    This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

  10. Final work plan : targeted groundwater sampling and monitoring well installation for potential site reclassification at Barnes, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.

    2006-07-11

    This ''Work Plan'' outlines the scope of work for a targeted groundwater sampling investigation and monitoring well installation at Barnes, Kansas. This activity is being conducted at the request of the Kansas Department of Health and Environment (KDHE), in accordance with the intergovernmental agreement between the KDHE and the Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA). Data resulting from the proposed work will be used to determine the hydraulic gradient near the former CCC/USDA facility, delineate the downgradient carbon tetrachloride plume, and determine additional monitoring requirements at Barnes. The overall goal is to establish criteria for monitoring leading to potential site reclassification. The proposed work will be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy (DOE). The Farm Service Agency of the USDA has entered into an interagency agreement with DOE, under which Argonne provides technical assistance with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a ''Master Work Plan'' (Argonne 2002) to provide general guidance for all investigations at former CCC/USDA facilities in Kansas. The ''Master Work Plan'', approved by the KDHE, contains the materials common to investigations at all locations in Kansas. This document must be consulted for the complete details of plans for this work associated with the former CCC/USDA facility at Barnes.

  11. Removal action work plan for the YS-860 Firing Ranges, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1998-03-01

    The US Department of Energy is conducting environmental restoration activities at the Y-12 Plant in Oak Ridge, Tennessee. As part of these efforts, a removal action is planned for the former YS-860 Firing Ranges as described in the Action Memorandum for the project. This removal action work plan (RmAWP) is focused on the former YS-860 Firing Ranges, located outside the primary fenceline at the eastern end of the plant. This RmAWP defines the technical approach, procedures, and requirements for the removal of lead-contaminated soil and site restoration of the former YS-860 Firing Ranges at the Y-12 Plant. This RmAWP describes excavation, verification/confirmatory sampling, and reporting requirements for the project. Lower tier plans associated with the RmAWP, which are submitted as separate stand-alone documents, include a field sampling and analysis plan, a health and safety plan, a quality assurance project plan, a waste management plan, a data management implementation plan, and a best management practices plan. A site evaluation of the YS-86O Firing Ranges conducted in 1996 by Lockheed Martin Energy Systems, Inc., determined that elevated lead levels were present in the Firing Ranges target berm soils. The results of this sampling event form the basis for the removal action recommendation as described in the Action Memorandum for this project. This RmAWP contains a brief history and description of the Former YS-860 Firing Ranges Project, along with the current project schedule and milestones. This RmAWP also provides an overview of the technical requirements of the project, including a summary of the approach for the removal activities. Finally, the RmAWP identifies the regulatory requirements and the appropriate removal action responses to address applicable or relevant and appropriate requirements to achieve the project goals of substantially reducing the risk to human health and the environment.

  12. Site Characterization Work Plan for Gasbuggy, New Mexico (Rev.1, Jan. 2002)

    SciTech Connect (OSTI)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office

    2002-01-25

    Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation activities

  13. Microsoft Word - 2015_0211_TWC_ThreeMonth_WorkPlan.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    2/11/15 Facilitator notes in blue March Committee meeting placeholder: Wednesday, March 11 Call placeholder: Tuesday, March 17, 3:00 p.m. April Committee meeting placeholder: Wednesday, April 15 Call placeholder: Tuesday, April 21, 3:00 p.m. May Committee meeting placeholder: Wednesday, May 13 Call placeholder: Tuesday, May 19, 3:00 p.m.  WTP: One System (Plan A for March)  Tank Vapor Implementation Plan  Cesium Storage IM Update  PHOENIX-Tank Farms (potential) o Mark Triplett, PNNL

  14. Integrated Program of Experimental Diagnostics at the NNSS. An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability

    SciTech Connect (OSTI)

    None, None

    2010-09-01

    This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories’ (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone #3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3-year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

  15. Old hydrofracture facility tanks contents removal action operations plan at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2: Checklists and work instructions

    SciTech Connect (OSTI)

    1998-05-01

    This is volume two of the ORNL old hydrofracture facility tanks contents removal action operations plan. This volume contains checklists and work instructions.

  16. Democratic Republic of Congo-ClimateWorks Low Carbon Growth Planning...

    Open Energy Info (EERE)

    Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Focus Area Forestry, Greenhouse Gas Topics Background analysis, Low emission...

  17. OXY (Occidental Petroleum Corp. ) units plan U. K. work worth $1. 5 billion

    SciTech Connect (OSTI)

    Not Available

    1980-09-15

    Occidental Refineries Ltd., an Occidental Petroleum Corp. subsidiary, plans to spend about $500,000 to build a 60,000 bbl/day hydrocracker on Canvey Island near London to produce aviation fuel, naphtha, and gasoline. Occidental hopes to deflect criticism by environmentalists, concerned about the concentration of petroleum facilities in the area, by installing a minimum amount of LPG storage and not using hydrogen sulfide on the site. During the 1970's, Occidental had prepared the site for the construction of a 125,000 bbl/day refinery, plans for which were scrapped after the demand for product compounds decreased. Occidental Chemical Co., another Occidental Petroleum subsidiary, plans to spend about $500,000 to build a 300,000 ton/yr ethylene plant at Peterhead, Scotl. The cracker would take part of the output from the de-ethanizer at the St. Fergus terminal for the proposed U.K. gas-gathering pipeline. Both projects would require about 3-4 yr to complete. Esso Chemical Ltd. will build a 550,000 ton/yr ethylene plant near the Mossmoran gas liquids plant in Fife, Scotl.

  18. WPN 14-4: Quality Work Plan Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    This guidance describes requirements to support and verify quality work in the Department of Energy's (DOE) Weatherization Assistance Program (WAP). It defines what constitutes a quality installation of weatherization measures, outlines how those measures are inspected and validated, and defines acceptable training and credentialing of workers. The quality work requirements are being implemented during the 2013, 2014 and 2015 Program Years. The requirements outlined in the five sections of the

  19. Technical Basis for Work Place Air Monitoring for the Plutonium Finishing Plan (PFP)

    SciTech Connect (OSTI)

    JONES, R.A.

    1999-10-06

    This document establishes the basis for the Plutonium Finishing Plant's (PFP) work place air monitoring program in accordance with the following requirements: Title 10, Code of Federal Regulations (CFR), Part 835 ''Occupational Radiation Protection''; Hanford Site Radiological Control Manual (HSRCM-1); HNF-PRO-33 1, Work Place Air Monitoring; WHC-SD-CP-SAR-021, Plutonium Finishing Plant Final Safety Analysis Report; and Applicable recognized national standards invoked by DOE Orders and Policies.

  20. Work Plan for Updating Double Shell Tank (DST) SubSystem Specifications (TBR 120.020)

    SciTech Connect (OSTI)

    GRENARD, C.E.

    1999-11-19

    The DST System stores waste from the processing of nuclear material at the Hanford Nuclear Reservation. The program to dispose of this waste has been divided into several phases with Phase 1 being the demonstration of the waste disposal technology by a private contractor. Subsystem specifications are being prepared providing requirements for the subsystems that are necessary for the continued safe storage of waste in the DST System and the removal of selected waste for processing by the privatized facility during Phase 1. This document provides the detailed plans for updating subsystem specifications developed during EY99.

  1. Environmental guidelines for Development of Cultural Resource Management plans. Working draft for comment

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    DOE has stewardship responsibilities for managing the cultural resources remaining on DOE-owned and other lands impacted by DOE programs. Goal of the DOE-wide Cultural Resource Management (CRM) program is to identify and consolidate compliance actions associated with statutory and regulatory requirements. This document is to provide guidelines to DOE field managers; its implementation is intended to assure that each DOE facility and program complies with executive orders, statutes, and regulations governing the management of cultural resources. It covers CRM goals, existing conditions, CRM methods, CRM procedures and administration, and plan attachments. Glossary, legislation, and documents are covered in appendices.

  2. Microsoft Word - 2014_1007_RAP_ThreeMonth_WorkPlan.doc

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    0/7/14 Facilitator notes in blue November Committee meeting placeholder: Wednesday, November 12 Call placeholder: Tuesday, November 18, 1:30 p.m. December Committee meeting placeholder: Tuesday, December 9 Call placeholder: Tuesday, December 15, 1:30 p.m. January Committee meeting placeholder: Tuesday, January 6 Call placeholder: Tuesday, January 13, 1:30 p.m. Central Plateau Inner Area Principles (follow-up to Board discussion) Area Management Plan Tour- MASF/Central Plateau (Kris Skopeck to

  3. 21st Century jobs initiative - building the foundations for a 21st Century economy. Appendix A, cluster working group initiative business plans

    SciTech Connect (OSTI)

    1995-11-01

    The business and community leaders who participated in a four-month long series of working groups developed business plans for initiatives which would lead to further growth and competitiveness of each of the industrial clusters. This appendix contains those business plans as they stood at the end of the working group session mid-September, 1995.

  4. Huge natural gas reserves central to capacity work, construction plans in Iran

    SciTech Connect (OSTI)

    Not Available

    1994-07-11

    Questions about oil production capacity in Iran tend to mask the country's huge potential as a producer of natural gas. Iran is second only to Russia in gas reserves, which National Iranian Gas Co. estimates at 20.7 trillion cu m. Among hurdles to Iran's making greater use of its rich endowment of natural gas are where and how to sell gas not used inside the country. The marketing logistics problem is common to other Middle East holders of gas reserves and a reason behind the recent proliferation of proposals for pipeline and liquefied natural gas schemes targeting Europe and India. But Iran's challenges are greater than most in the region. Political uncertainties and Islamic rules complicate long-term financing of transportation projects and raise questions about security of supply. As a result, Iran has remained mostly in the background of discussions about international trade of Middle Eastern gas. The country's huge gas reserves, strategic location, and existing transport infrastructure nevertheless give it the potential to be a major gas trader if the other issues can be resolved. The paper discusses oil capacity plans, gas development, gas injection for enhanced oil recovery, proposals for exports of gas, and gas pipeline plans.

  5. Work plan for the High Ranking Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-03-01

    The High Ranking Facilities Deactivation Project (HRFDP), commissioned by the US Department of Energy Nuclear Materials and Facility Stabilization Program, is to place four primary high-risk surplus facilities with 28 associated ancillary facilities at Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition as rapidly and economically as possible. The facilities will be deactivated and left in a condition suitable for an extended period of minimized surveillance and maintenance (S and M) prior to decontaminating and decommissioning (D and D). These four facilities include two reactor facilities containing spent fuel. One of these reactor facilities also contains 55 tons of sodium with approximately 34 tons containing activated sodium-22, 2.5 tons of lithium hydride, approximately 100 tons of potentially contaminated lead, and several other hazardous materials as well as bulk quantities of contaminated scrap metals. The other two facilities to be transferred include a facility with a bank of hot cells containing high levels of transferable contamination and also a facility containing significant quantities of uranyl nitrate and quantities of transferable contamination. This work plan documents the objectives, technical requirements, and detailed work plans--including preliminary schedules, milestones, and conceptual FY 1996 cost estimates--for the Oak Ridge National Laboratory (ORNL). This plan has been developed by the Environmental Restoration (ER) Program of Lockheed Martin Energy Systems (Energy Systems) for the US Department of Energy (DOE) Oak Ridge Operations Office (ORO).

  6. Work plan for phase 1A paleochannel studies at the Cheney disposal cell, Grand Junction, Colorado: Draft

    SciTech Connect (OSTI)

    1996-11-01

    This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts.

  7. Waste management project fiscal year 1998 multi-year work plan WBS 1.2

    SciTech Connect (OSTI)

    Slaybaugh, R.R.

    1997-08-29

    The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

  8. Activity-level Work Planning and Control in the Hanford Site Worker Evaluation Tool

    Broader source: Energy.gov [DOE]

    Slide Presentation by Ted Giltz, Volpentest HAMMER Federal Training Center. Hanford Site Worker Eligibility Tool, Verifying Activity-Level Worker Medical Clearance and Training. The Hanford Site Worker Eligibility Tool (HSWET) provides line management an easy to use tool to determine if workers are medically cleared and trained to perform work safely.

  9. Remedial investigation/feasibility study work plan for the 100-KR-4 operable unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1992-09-01

    Four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). This work plan and the attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the CERCLA remedial investigation/feasibility study (RI/FS) for the 100-KR-4 operable unit. The 100-K Area consists of the 100-KR-4 groundwater operable unit and three source operable units. The 100-KR-4 operable unit includes all contamination found in the aquifer soils and water beneath the 100-K Area. Source operable units include facilities and unplanned release sites that are potential sources of contamination.

  10. Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington. Revision

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium-{sup 99}{Tc}-Nitrate multi-contaminant IRM plume identified beneath U Plant.

  11. Hanford fire department FY 99 annual work plan WBS 6.5.7

    SciTech Connect (OSTI)

    GOOD, D.E.

    1999-02-24

    The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing a full range of services at the lowest possible cost to customers. These services include fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency situations which could threaten the operations, employees, the general public, or interest of the U. S. Department of Energy operated Hanford Site. This includes response to surrounding fire departments/districts under mutual aid and state mobilization agreements and fire fighting, hazardous materials, and ambulance support to Washington Public Power Supply System (Supply System) and various commercial entities operating on site through Requests for Service from DOE-RL. The fire department also provides site fire marshal overview authority, fire system testing and maintenance, respiratory protection services, building tours and inspections, ignitable and reactive waste site inspections, prefire planning, and employee fire prevention education.

  12. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    SciTech Connect (OSTI)

    Jacobsen, P.H.

    1997-09-23

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.

  13. Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    May 25, 2007 Kevin Kolevar Director of the Office of Electricity Deliverability and Energy Reliability Department of Energy 1000 Independence Ave., SW Washington, DC 20585 Dear Mr. Kolevar, DOE has requested that Pepco provide an update on the current work to install two new 230 kilovolt circuits into Potomac River substation and to evaluate the need for generation from the Potomac River plant to support the anticipated line outage during June, 2007. An outage on one of the 230 kV circuits is

  14. New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect (OSTI)

    L. O. Nelson

    2003-09-01

    This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

  15. RISMC advanced safety analysis working plan: FY2015 - FY2019. Light Water Reactor Sustainability Program

    SciTech Connect (OSTI)

    Szilard, Ronaldo H; Smith, Curtis L

    2014-09-01

    In this report, the Advanced Safety Analysis Program (ASAP) objectives and value proposition is described. ASAP focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. The set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. As part of the discussion, we have identified three sets of stakeholders, the nuclear industry, the Department of Energy (DOE), and associated oversight organizations. These three groups would benefit from ASAP in different ways. For example, within the DOE complex, the possible applications that are seen include the safety of experimental reactors, facility life extension, safety-by-design in future generation advanced reactors, and managing security for the storage of nuclear material. This report provides information in five areas: (1) A value proposition (“why is this important?”) that will make the case for stakeholder’s use of the ASAP research and development (R&D) products; (2) An identification of likely end users and pathway to adoption of enhanced tools by the end-users; (3) A proposed set of practical and achievable “use case” demonstrations; (4) A proposed plan to address ASAP verification and validation (V&V) needs; and (5) A proposed schedule for the multi-year ASAP.

  16. Understanding Cognitive and Collaborative Work: Observations in an Electric Transmission Operations Control Center

    SciTech Connect (OSTI)

    Obradovich, Jodi H.

    2011-09-30

    This paper describes research that is part of an ongoing project to design tools to assist in the integration of renewable energy into the electric grid. These tools will support control room dispatchers in real-time system operations of the electric power transmission system which serves much of the Western United States. Field observations comprise the first phase of this research in which 15 operators have been observed over various shifts and times of day for approximately 90 hours. Findings describing some of the cognitive and environmental challenges of managing the dynamically changing electric grid are presented.

  17. New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B

    SciTech Connect (OSTI)

    Nelson, L. O.

    2007-06-12

    This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

  18. Work plan for ground water elevation data recorder/monitor well injection at Grand Junction, Colorado

    SciTech Connect (OSTI)

    Not Available

    1994-07-18

    The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of ground water monitor wells and ground water elevation data recorders (data loggers) at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. The monitor wells and data loggers will be used to gather required time-dependent data to investigate the interaction between the shallow aquifer and the Colorado River. Data collection objectives (DCO) identify reasons for collecting data. The following are DCOs for the Grand Junction ground water elevation data recorder/monitor well installation project: long-term continuous ground water level data and periodic ground water samples will be collected to better understand the relationship between surface and ground water at the site; water level and water quality data will eventually be used in future ground water modeling to more firmly establish boundary conditions in the vicinity of the Grand Junction processing site; modeling results will be used to demonstrate and document the potential remedial alternative of natural flushing.

  19. Better Buildings Neighborhood Program Working with Utilities Peer Exchange Call: Effective Strategies for Participating in Utility Planning Call Slides and Discussion Summary, August 2, 2012

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2, 2012 Better Buildings Neighborhood Program Working with Utilities Peer Exchange Call: Effective Strategies for Participating in Utility Planning Call Slides and Discussion Summary Agenda * Call Logistics and Attendance  Has your program found ways to integrate with/ participate in utility planning efforts? * Program Experience and Lessons:  Bainbridge, WA: Yvonne Kraus * Discussion:  What are best practices for participating in utility planning and integrating energy efficiency

  20. Status Update on Action 2c: Criteria Review and Approach Document (CRAD) for Performing Assessments of Activity-level Work Planning and Control

    Broader source: Energy.gov [DOE]

    Slide Presentation by Bradley K. Davy, Director, Office of Worker Safety and Health Assistance, HS. Criteria Review and Approach Document (CRAD) for Performing Assessments of Activity- Level Work Planning and Control. DOE CRAD Development Approach.

  1. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV

    SciTech Connect (OSTI)

    R. P. Wells

    2006-11-14

    This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

  2. Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III

    SciTech Connect (OSTI)

    R. P. Wells

    2006-09-19

    The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

  3. Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1

    SciTech Connect (OSTI)

    Wells, J.L.

    1997-03-01

    The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

  4. Final work plan : Phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Savannah, Missouri.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2007-10-12

    . This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigative activities at Savannah will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with the DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Savannah will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Savannah investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Savannah site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne will issue a Provisional Master Work Plan (PMWP; Argonne 2007) that will be submitted to the MoDNR for review and approval. The agency has already reviewed and approved (with minor changes) the present Master Work Plan (Argonne 2002) under which Argonne currently operates in Kansas. The PMWP (Argonne 2007) will provide detailed information and guidance on the investigative technologies, analytical methodologies, quality assurance-quality control measures, and general health and safety policies to be employed by

  5. 6-Month Work Plan

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    * Briefing on remediation technology for 618-10, 11 VPUs * Briefing on remediation technology for 324 Building, B-Cell March * Update on U Canyon (sand filters and reverse...

  6. Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory

    SciTech Connect (OSTI)

    Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

    1993-07-01

    This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

  7. Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

  8. Final work plan : phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Montgomery City, Missouri.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2010-08-16

    former grain storage facility, the CCC/USDA will conduct investigations to (1) characterize the source(s), extent, and factors controlling the possible subsurface distribution and movement of carbon tetrachloride at the Montgomery City site and (2) evaluate the health and environmental threats potentially represented by the contamination. This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and the MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigations at Montgomery City will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Montgomery City will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Montgomery City investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Montgomery City site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne has issued a Provisional Master Work Plan (PMWP; Argonne 2007) that has been reviewed and approved by the MoDNR for current use. The PMWP (Argonne 2007) provides

  9. Final work plan : supplemental upward vapor intrusion investigation at the former CCC/USDA grain storage facility in Hanover, Kansas.

    SciTech Connect (OSTI)

    LaFreniere, L. M.; Environmental Science Division

    2008-12-15

    The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility at the northeastern edge of the city of Hanover, Kansas, from 1950 until the early 1970s. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In February 1998, trace to low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5.0 {micro}g/L) were detected in two private wells near the former grain storage facility at Hanover, as part of a statewide USDA private well sampling program that was implemented by the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. In 2007, the CCC/USDA conducted near-surface soil sampling at 61 locations and also sampled indoor air at nine residences on or adjacent to its former Hanover facility to address the residents concerns regarding vapor intrusion. Low levels of carbon tetrachloride were detected at four of the nine homes. The results were submitted to the KDHE in October 2007 (Argonne 2007). On the basis of the results, the KDHE requested sub-slab sampling and/or indoor air sampling (KDHE 2007). This Work Plan describes, in detail, the proposed additional scope of work requested by the KDHE and has been developed as a supplement to the comprehensive site investigation work plan that is pending (Argonne 2008). Indoor air samples collected previously from four homes at Hanover were shown to contain the carbon tetrachloride at low concentrations (Table 2.1). It cannot be concluded from these previous data that the source of the detected carbon tetrachloride is vapor intrusion attributable to former grain storage operations of the CCC/USDA at Hanover. The technical objective of the vapor intrusion investigation described here is to assess the risk to human health due to the potential for upward migration of carbon tetrachloride and

  10. FY 1990 environmental research programs for the Nevada Operations Office. Work plan and quarterly reports, first through fourth quarter reports

    SciTech Connect (OSTI)

    1990-11-01

    This work includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies and site mitigation plans; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design activities. In addition to these, archaeological and other activities will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, derivative classification of DRI documents, and preparation of any special reports not included in the requirements of the individual projects.