NSLS Work Planning & Controls  

NLE Websites -- All DOE Office Websites (Extended Search)

Work Planning & Controls NSLS Work Planning and Control Procedure Lead Working Guidelines Information on Working in Areas Subject to Radiation from VUV Injection Procedure for...

2

Site observational work plan for the UMTRA Project site at Falls City, Texas  

Science Conference Proceedings (OSTI)

Produced by the US Department of Energy (DOE), this site observational work plan (SOWP) will be used to determine site-specific activities to comply with the US Environmental Protection Agency (EPA) ground water standards at this Uranium Mill Tailings Remedial Action (UMTRA) Project site. The purpose of the SOWP is to recommend a site-specific ground water compliance strategy at the Falls City UMTRA Project site. The Falls City SOWP presents a comprehensive summary of site hydrogeological data, delineates a conceptual model of the aquifer system, and discusses the origins of milling-related ground water contamination. It also defines the magnitude of ground water contamination, potential environmental and health risks associated with ground water contamination and data gaps, and targets a proposed compliance strategy.

NONE

1995-06-01T23:59:59.000Z

3

Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico  

SciTech Connect

Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC {section}7901 et seq.) and the U.S. Environmental Protection Agency`s Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts.

NONE

1995-02-01T23:59:59.000Z

4

Site observational work plan for the UMTRA project site at Grand Junction, Colorado  

Science Conference Proceedings (OSTI)

This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

NONE

1996-01-01T23:59:59.000Z

5

CFN Ops Plan | Work Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Plan Operations Plan Work Planning & Control for Experiments and Operations All experimental work will be conducted in accordance with Work Planning and Control for Experiments and Operations, which ensures proper design and operation of all experiments prior to their commencement. CFN will use the SBMS provided standard form for the formal documentation. The Lead Experimenter/Responsible person will notify the Experimental Safety Review Committee of any new experiments or modifications to existing experiments. CFN will appoint an Experimental Safety Review Committee. This committee will consist of the Experiment Review Coordinator, CFN personnel, Facility Support Representative (FSR), Environmental Compliance Representative (ECR). Additional subject matter experts may be appointed on an ad-hoc

6

Mon Valley work plan  

Office of Legacy Management (LM)

GWSHP 1.8 GWSHP 1.8 U.S. Department of Energy UMTRA Ground Water Project Work Plan for Characterization Activities at the Shiprock UMTRA Project Site June 1998 Prepared by U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Project Number UGW-511-0020-01-000 Document Number U0013400 Work Performed under DOE Contract No. DE-AC13-96GJ87335 Note: Some of the section page numbers in the Table of Contents may not correspond to the page on which the section appears when viewing them in Adobe Acrobat. Document Number U0013400 Contents DOE/Grand Junction Office Work Plan for Characterization Activities at Shiprock Project Site June 1998 Draft Final Page v Contents Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi 1.0 Introduction .

7

Supplement to the site observational work plan for the UMTRA project site at Ambrosia Lake, New Mexico  

SciTech Connect

The purpose of this document is to provide additional and more detailed information to supplement review of the site observational work plan (SOWP) (DOE, 1995) for the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This document includes a discussion of the average linear velocity of the ground water in the alluvium and a discussion of the ground water quality of the alluvium, weathered Mancos Shale, and the Tres Hermanos-C Member of the Mancos Shale. The data from a 1989 aquifer test were analyzed using the curve-matching software AQTESOLV and then compared with the original results. A hydrograph of the ground water elevations in monitoring wells screened in the alluvium is presented to show how the ground water elevations change with time. Stiff and Piper diagrams were created to describe the changes in ground water geochemistry in the alluvium/weathered Mancos Sahel unit, the Tres Hermanos-C Sandstone unit, the Tres Hermanos-B Sandstone unit, and the Dakota Sandstone. Background information on other related topics such as site history, cell construction, soil characteristics, and well construction are presented in the SOWP. A geologic cross section depicts the conceptual model of the hydrostratigraphy and ground water chemistry of the Ambrosia Lake site. Hydrogeologic information of each hydrostratigraphic unit is presented.

NONE

1995-11-01T23:59:59.000Z

8

Supplement to the site observational work plan for the UMTRA Project Site at Ambrosia Lake, New Mexico  

SciTech Connect

The purpose of this document is to provide additional and more detailed information to supplement review of the site observational work plan (SOWP) for the Ambrosia Lake, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This document includes a discussion of (1) the average linear velocity of the ground water in the alluvium; (2) the ground water quality of the alluvium, weathered Mancos Shale, and the Tres Hermanos-C Member of the Mancos Shale; and (3) the fate and transport of contaminants from the uppermost aquifer to the Westwater Canyon Member of the Morrison Formation. The data from a 1989 aquifer test were analyzed using the curve-matching software AQTESOLV and then compared with the original results. A hydrograph of the ground water elevations in monitoring wells screened in the alluvium is presented to show how the ground water elevations change with time. Stiff and Piper diagrams were created to describe the changes in ground water geochemistry in the alluvium/weathered Mancos Shale unit, the Tres Hermanos-C Sandstone unit, the Tres Hermanos-B Sandstone unit, and the Dakota Sandstone. Background information on other related topics such as site history, cell construction, soil characteristics, and well construction are presented in the SOWP. Figure 1 is a geologic cross section depicting the conceptual model of the hydrostratigraphy and ground water chemistry of the Ambrosia Lake site. Table 1 presents hydrogeologic information of each hydrostratigraphic unit.

NONE

1996-02-01T23:59:59.000Z

9

FY 1994 Annual Work Plan  

SciTech Connect

In accordance with the Inspector General`s Strategic Planning Policy directive, the Office of Inspector General (OIG) annually updates its Strategic Plan with budgetary and program guidance for the next fiscal year. The program guidance identifies and establishes priorities for OIG coverage of important DOE issues and operations, provides the basis for assigning OIG resources, and is the source for issues covered in Assistant Inspectors General annual work plans. The Office of the Assistant Inspector General for Audits (AIGA) publishes an Annual Work Plan in September of each year. The plan includes the OIG program guidance and shows the commitment of resources necessary to accomplish the assigned work and meet our goals. The program guidance provides the framework within which the AIGA work will be planned and accomplished. Audits included in this plan are designed to help insure that the requirements of our stakeholders have been considered and blended into a well balanced audit program.

1993-09-30T23:59:59.000Z

10

Strong planning under partial observability  

Science Conference Proceedings (OSTI)

Rarely planning domains are fully observable. For this reason, the ability to deal with partial observability is one of the most important challenges in planning. In this paper, we tackle the problem of strong planning under partial observability in ... Keywords: Binary decision diagrams, Heuristic search in belief space, Planning in nondeterministic domains, Planning under partial observability, Symbolic model checking

Piergiorgio Bertoli; Alessandro Cimatti; Marco Roveri; Paolo Traverso

2006-04-01T23:59:59.000Z

11

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL  

Office of Legacy Management (LM)

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND RESTORATION OF THE DOE MOUND SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH SITE, THE MOUND 2000 APPROACH FEBRUARY 1999 Final (Revision 0) Department of Energy Babcock & Wilcox of Ohio Mr. Daniel Bird AICP, Planning Manager Miamisburg Mound Community Improvement Corporation 720 Mound Road Miamisburg, Ohio 45342-6714 Dear Mr. Bird: The Core Team, consisting of the U.S. Department of Energy Miamisburg Environmental Management Project (DOE-MEMP), U.S. Environmental Protection Agency (USEPA), and the Ohio Environmental Protection Agency (OEPA), appreciates your comments on the Work

12

FY 1994 Annual Work Plan  

SciTech Connect

This is the third Office of Inspector General (OIG)Annual Work Plan. Its purpose is to summarize work completed in Fiscal Year (FY) 1993, identify ongoing projects from previous fiscal years which the OIG intends to continue into FY 1994, and announce planned projects which the OIG intends to begin in FY 19994.

Not Available

1993-10-01T23:59:59.000Z

13

FY 1996 annual work plan  

SciTech Connect

In April 1994, the Department of Energy (DOE) Strategic Plan was issued. This Plan presents the Department`s strategic outlook in response to a changing world. It discusses the Department`s unique capabilities; its mission, vision, and core values; and key customer and stakeholder considerations. The DOE Strategic Plan lists business strategies and critical success factors which are intended to aid the Department in accomplishing its mission and reaching its vision of itself in the future. The Office of Inspector General (OIG) has an important role in carrying out the goals and objectives of the Secretary`s Strategic Plan. The ultimate goal of the OIG is to facilitate positive change by assisting its customers, responsible Government officials, in taking actions to improve programs and operations. The Inspector General annually issues his own Strategic Plan that contains program guidance for the next fiscal year. As part of its responsibility in carrying out the OIG mission, the Office of the Deputy Inspector General for Audit Services (Office of Audit Services) publishes an Annual Work Plan that sets forth audits that are planned for the next fiscal year. Selection of these audits is based on the overall budget of the Department, analyses of trends in Departmental operations, guidance contained in the agency`s strategic plans, statutory requirements, and the expressed needs and audit suggestions of Departmental program managers and OIG managers and staff. This work plan includes audits that are carried over from FY 1995 and audits scheduled to start during FY 1996. Audits included in the plan will be performed by OIG staff.

1995-09-30T23:59:59.000Z

14

TWRS Systems Engineering Working Plan  

SciTech Connect

The purpose of this Systems Engineering (SE) Working Plan (SEWP) is to describe how the Westinghouse Hanford Company (WHC) Tank Waste Remediation System (TWRS) will implement the SE polity and guidance provided in the Tank Waste Remediation System (TWRS) Systems Engineering Management Plan (SEMP). Sections 2.0 through 4.0 cover how the SE process and management will be performed to develop a technical baseline within TWRS. Section 5.0 covers the plans and schedules to implement the SE process and management within TWRS. Detailed information contained in the TWRS Program SEMP is not repeated in this document. This SEWP and the SE discipline defined within apply to the TWRS Program and new and ongoing TWRS projects or activities, including new facilities and safety. The SE process will be applied to the existing Tank Farm operations where the Richland TWRS Program Office management determines the process appropriate and where value will be added to existing Tank Farm system and operations.

Eiholzer, C.R.

1994-09-16T23:59:59.000Z

15

Work Plans & Manuals | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

16

Accumulated waste characterization work plan  

Science Conference Proceedings (OSTI)

The Portsmouth Gaseous Diffusion Plant (PORTS) as part of the uranium enrichment complex produces enriched uranium for power generation and defense purposes. Since the beginning of diffusion plant operations in 1953, a variety of waste materials and excess equipment has been generated through both normal operations and as part of major system upgrade programs. However, as a result of the closure of former onsite radioactive management facilities and limited onsite and offsite disposal facilities for mixed (hazardous and radioactive) wastes, PORTS has accumulated large quantities of waste awaiting final disposition. These accumulated wastes were estimated in the Accumulated Waste Plan (AWP) to consist of some 21,700 containers of the radioactive, RCRA hazardous, PCB, mixed and asbestos wastes in various storage areas and process buildings with PORTS. In order to proper manage these wastes onsite and prepare for them for ultimate treatment or disposal, a detailed understanding of the waste contents and characteristics must be developed. The strategy for managing and disposing of these wastes was outlined in the AWP. The purpose of this Accumulated Waste Characterization Work Plan (AWCWP) is to provide a detailed plan for characterizing waste containers from the existing PORTS inventory. The AWCWP documents the process and analytical information currently available and describes statistically-based sampling and analyses required to support proper regulatory classification.

Not Available

1992-01-01T23:59:59.000Z

17

Headquarters Facilities Work Planning and Control Program | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program Headquarters Facilities Work Planning and Control Program...

18

Integrated Safety Management (ISM) - Work Planning and Control  

NLE Websites -- All DOE Office Websites (Extended Search)

Work Planning and Control Integrated Safety Management (ISM) ism logo NNSA Activity Level Work Planning & Control Processes - January 2006...

19

TEC Working Group Topic Groups Rail Key Documents Planning Subgroup...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rail Key Documents Planning Subgroup TEC Working Group Topic Groups Rail Key Documents Planning Subgroup Planning Subgroup Rail Planning Timeline Benchmarking Project: AREVA Trip...

20

Work Plan - U.S.-India Coal Working Group | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Plan - U.S.-India Coal Working Group Work Plan - U.S.-India Coal Working Group Work Plan - U.S.-India Coal Working Group More Documents & Publications HSS Work Group Telecom...

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Annual work plan for FY 1992  

SciTech Connect

The Office of Inspector General (OIG) has an overall mission to prevent and detect fraud, waste, and mismanagement in Department of Energy (DOE) programs. As part of its responsibility in accomplishing its mission, the DOE Office of Audits publishes an Annual Work Plan'' in September of each year. The prime focus of the plan is to identify opportunities for audits to enhance the effectiveness, efficiency, and integrity of the DOE's programs and operations. Through this plan, we are able to maximize the effectiveness of our resources and to avoid duplicating audit coverage being provided by other audit groups, such as the US General Accounting Office (GAO) to US Department of Energy programs. Such planning is required by Office of Management and Budget Circular A-73 and DOE Order 2321.1A. This work plan, includes those audits that are to be carried over from Fiscal Year 1991 and those that are to be started during Fiscal year 1992.

Not Available

1991-09-30T23:59:59.000Z

22

MN471018, Work Planning and Control Manual  

NLE Websites -- All DOE Office Websites (Extended Search)

18, Work Planning and Control Manual 18, Work Planning and Control Manual Sponsor: Michael W. Hazen, 4000 Issue Date: January 3, 2007 Revision Date: June 1, 2009 This document is no longer a CPR. This document implements the requirements of Corporate procedure ESH100.1.WPC.1, Plan and Control Work. IMPORTANT NOTICE: A printed copy of this document may not be the document currently in effect. The official version is the online version located on the Sandia Restricted Network (SRN) MN471018 - WORK PLANNING AND CONTROL MANUAL Subject Matter Expert: Brad Elkin; CA Counterpart: Aden Jackson MN471018 Revision Date: June 1, 2009; Replaces Document: October 28, 2008 Implementation Notice: The requirements outlined in this document must be incorporated into approved comprehensive organizational procedures on or before June 30, 2009. New work planned and conducted after June 30, 2009 shall be performed in accordance with this document. Ongoing work, conducted under an existing, current, and approved PHS and TWD (if required), is authorized until the expiration of the applicable PHS, TWD, or June 30, 2010.

23

FY 1987 current fiscal year work plan  

SciTech Connect

This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, information gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.

1986-12-01T23:59:59.000Z

24

ICDF Complex Remedial Action Work Plan  

SciTech Connect

This Remedial Action Work Plan provides the framework for operation of the Idaho Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) Disposal Facility Complex (ICDF). This facility includes (a) an engineered landfill that meets the substantial requirements of DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, Idaho Hazardous Waste Management Act, and Toxic Substances Control Act polychlorinated biphenyl landfill requirements; (b) centralized receiving, inspections, administration, storage/staging, and treatment facilities necessary for CERCLA investigation-derived, remedial, and removal waste at the Idaho National Laboratory (INL) prior to final disposition in the disposal facility or shipment off-Site; and (c) an evaporation pond that has been designated as a corrective action management unit. The ICDF Complex, including a buffer zone, will cover approximately 40 acres, with a landfill disposal capacity of approximately 510,000 yd3. The ICDF Complex is designed and authorized to accept INL CERCLA-generated wastes, and includes the necessary subsystems and support facilities to provide a complete waste management system. This Remedial Action Work Plan presents the operational approach and requirements for the various components that are part of the ICDF Complex. Summaries of the remedial action work elements are presented herein, with supporting information and documents provided as appendixes to this work plan that contain specific detail about the operation of the ICDF Complex. This document presents the planned operational process based upon an evaluation of the remedial action requirements set forth in the Operable Unit 3-13 Final Record of Decision.

W. M. Heileson

2006-12-01T23:59:59.000Z

25

Climate VISION: Private Sector Initiatives: Magnesium: Work Plans  

Office of Scientific and Technical Information (OSTI)

Work Plans EPA's SF6 Emission Reduction Partnership for the Magnesium Industry in cooperation with the International Magnesium Association has developed a work plan for achieving...

26

US - Brazil Binational Energy Working Group Joint Action Plan...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

US - Brazil Binational Energy Working Group Joint Action Plan US - Brazil Binational Energy Working Group Joint Action Plan brazilactionplan7202010.pdf More Documents &...

27

PROJECT MANGEMENT PLAN EXAMPLES Prepare Detailed Work Packages...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Packages Examples Example 71 8.2.5 Work Processes Work associated with nuclear safety functions will be planned, authorized, and performed following approved technical...

28

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Remedial DesignRemedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis. This plan is consistent...

29

Intermodal Subgroup Draft Work Plan2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 of 2 Work Plan for the DOE TEC Rail Topic Group Intermodal Sub-Group Status: Active Chair: Melissa Bailey (CSG-NE) DOE Lead: Alex Thrower (OCRWM) Contractor Support: John Smegal (Legin) Start Date: July 17, 2007 Purpose: The purpose of the Transportation External Coordinating (TEC) Working Group's Rail Topic Group (RTG) is to provide stakeholder perspectives and feedback to the Office of National Transportation (ONT) in the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) and Environmental Management (EM) regarding topics of common interest concerning operating practices, logistical constraints, and other rail-related issues affecting the development and deployment of a safe, secure, and efficient system for transporting spent fuel (SNF) and high-level radioactive waste (HLW) to a

30

CRAD, Work Controls Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Controls Assessment Plan Work Controls Assessment Plan CRAD, Work Controls Assessment Plan Performance Objective: Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed. Criteria: Work planning addresses applicable laws, codes and regulations. Work planning includes operational configuration constraints; material, tool, and manpower requirements; inter-organizational coordination; operational history; special training; safety considerations; hazards protection requirements; post-maintenance testing; quality control requirements; and other considerations as necessary. The work to be accomplished is defined by identifying the existing deficiency and condition; prescribing appropriate approvals; and including

31

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Construction Quality Assurance Plan Construction Quality Assurance Plan This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page H-1 Construction Quality Assurance Plan 1.1 Introduction This Construction Quality Assurance Plan supports the implementation of remedial activities at LEHR covered by the Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis. This plan is consistent with and supplements the requirements of the Quality Assurance Project Plan and quality assurance elements covered in Section 7 of the Remedial Design/Remedial Action Work Plan. 1.2 Distribution This plan shall be distributed with the Remedial Design/Remedial Action Work Plan to all

32

Operational efficiency through resource planning optimization and work process improvement  

E-Print Network (OSTI)

This thesis covers work done at National Grid to improve resource planning and the execution of pipeline construction and maintenance work carried out at the yards. Resource Planning, the art of picking the right jobs for ...

Balwani, Siddharth (Siddharth Vashdev)

2012-01-01T23:59:59.000Z

33

NSLS Committees | Work Planning/Permit Review Committee  

NLE Websites -- All DOE Office Websites (Extended Search)

require enhanced work planning. Committees review and approve submitted work permits. NSLS reports to Operations Section Head, Emil Zitvogel. NSLS-II reports to ESH Manager,...

34

Climate VISION: Private Sector Initiatives: Aluminum: Work Plans  

Office of Scientific and Technical Information (OSTI)

finalized its work plan with the collaboration of EPA. The plan describes actions the industry intends to take to achieve its Climate VISION goal by 2010. Read the Aluminum...

35

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Management Plan November 2010 This page intentionally left blank U.S. Department of Energy LEHR Remedial DesignRemedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page...

36

WORK CONTROLS: Assessment Plan Developed By NNSA/Nevada Site...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

considerations as necessary. Work-Controls.doc More Documents & Publications NASA BENCHMARKS LESSONS LEARNED Assessment Plan Developed By NNSANevada Site Office Facility...

37

Climate VISION: Private Sector Initiatives: Cement: Work Plans  

Office of Scientific and Technical Information (OSTI)

NewsEvents Contact Us CEMENT Letters of IntentAgreements Work Plans GHG Information Energy Footprints Resources & Links Industry Associations FederalState Programs Technical...

38

Climate VISION: Private Sector Initiatives: Lime: Work Plans  

Office of Scientific and Technical Information (OSTI)

Us LIME Letters of IntentAgreements Work Plans GHG Inventory Protocols Resources & Links Energy Management Industry Associations Software Tools Training Calendar Results Lime -...

39

Site Visit Report - Independent Oversight Review of Work Planning...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and surveys. * Brief each stop work to the site manager. * Communicate incidentevent issues through plan of the day and flow down to front line supervision. * Present to...

40

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Remedial DesignRemedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 LMSLEH...

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

2 Retirement Plans Comparison 4 How the Plan Works  

E-Print Network (OSTI)

this brochure, you may contact: n TIAA-CREF: tiaa-cref.org n Vanguard: vanguard.com n Benefits Office: benefits contribution rate and percentage allocation between your TIAA-CREF and Vanguard accounts will continue year the amount you want to contribute to the plan and the percentage you would like to invest with TIAA

Scherer, Norbert F.

42

Project Management Plan (PMP) for Work Management Implementation  

SciTech Connect

The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

SHIPLER, C.E.

2000-01-13T23:59:59.000Z

43

FY 1999 annual work plan for infrastructure program WBS 6  

SciTech Connect

The Fiscal Year (FY) 1999 DynCorp Annual Work Plan (AWP) relates DOE-RL work breakdown structure (WBS) to Cost Accounts and to Organizational Structure. Each Cost Account includes a workscope narrative and justification performance and service standards, goals, and deliverables. Basis of estimates are included within each Cost Account to demonstrate the relationship of budget to defined workscope. The FY 1999 AWP reflects the planning assumptions and initiatives that are included in the PHMC Strategic Plan for Infrastructure Optimization which was established in FY 1998. Development of the FY 1999 AWP was in accordance with a sequential series of events and efforts described in the Infrastructure Annual Work Planning and Budget Cycle which was developed and established in conjunction with the Strategic Plan. The Strategic Plan covers a rolling five year span of time and is updated at the start of each fiscal year as the beginning of the annual work planning and budget cycle for the following fiscal year. Accordingly the planning for the FY 1999 AWP began in January 1998. Also included in the annual work planning and budget cycle, and the basis for the budget in this AWP, is the development of a requirements-based budget.

Donley, C.D.

1998-08-27T23:59:59.000Z

44

Climate VISION: PrivateSector Initiatives: Mining: Work Plans  

Office of Scientific and Technical Information (OSTI)

Work Plans Work Plans The National Mining Association (NMA) will lead the industry effort to produce a work plan in collaboration with DOE and EPA. The plan will include the industry's proposed implementation actions to reduce greenhouse gas emission intensity by 2012 and a schedule for achieving its commitments. The industry group, with the assistance of DOE and EPA, will implement the actions. It is anticipated that the work plan may contain four major components: Element 1: Emission measurement and reporting protocols Emission measurement and reporting protocols relate to various "Actions" of the industry group's Climate VISION letter of intent. Element 2: Identify/implement near-term, cost-effective opportunities The identification and implementation of near-term, cost-effective actions

45

Subseabed Disposal Program Plan. Volume II. FY80 budget and subtask work plans  

Science Conference Proceedings (OSTI)

This volume of the Subseabed Disposal Program Plan presents a breakdown of the master program structure by major activity. Each activity is described and accompanied by a specific cost plan schedule and a milestone plan. The costs have been compiled in the Cost Plan Schedules attached to each Subtask Work Plan. The FY 1980 budget for the Subseabed Disposal Program is summarized at the second level of the Work Breakdown Structure. The milestone plans for FY 80 are presented. The milestones can be changed only with the concurrence of the Sandia Subseabed Program Manager.

Not Available

1980-01-01T23:59:59.000Z

46

Office of Inspector General fiscal year 1996 annual work plan  

Science Conference Proceedings (OSTI)

This FY 1996 Office of Inspector General (OIG) Annual Work Plan is a summary and distillation of information contained in annual work plans, and includes audits and inspections that are carried over from FY 1995 as well as audits and inspections scheduled to start during FY 1996. Audits and inspections included in this consolidated OIG Annual Work Plan will be performed by OIG staff. Specialized expertise available through a Certified Public Accounting firm will be used to assist in auditing the Department`s financial statements. As part of the OIG Cooperative Audit Strategy, additional audit coverage of the Department`s programs is provided by internal auditors of the Department`s integrated contractors. Through the Cooperative Audit Strategy, the OIG ensures that the internal auditors satisfy audit standards, provides planning guidance to the internal auditors, coordinates work to avoid duplication, and tracks the work of internal auditors to ensure that needed audits are performed. Applicable portions of the four annual work plans issued for Fiscal Year 1996 by the Deputy/Assistant Inspectors General have been combined to form a major part of this overall OIG Annual Work Plan. Also included are portions of the most recent OIG Semiannual Reports to Congress to give an overview of the OIG`s mission/organization, resource status, and the environment in which the OIG currently operates. The OIG Annual Work Plan also lists ongoing and planned audits and inspections, and it presents investigative statistics which have been previously reported in the two OIG Semiannual Reports to Congress which cover Fiscal Year 1995. Furthermore, included in this work plan are descriptions of several innovations developed by the OIG to streamline its operations and to conserve as much efficiency and economy as possible in a time of resource reductions.

NONE

1995-10-01T23:59:59.000Z

47

Assessment Plan and Timeline Department of Social Work  

E-Print Network (OSTI)

1 3 3 Assessment Plan and Timeline Department of Social Work Program Learning Goals & Outcomes When to actively engage clients this way? Program Objective 1. Understand and commit to the social work value and practice communication skills for effectively social work practice Program Objective 7. Learn and apply

de Lijser, Peter

48

Work Controls Assessment Plan Assessment Plan Assessment plan - Developed By NNSA/Nevada Site Office Facility Representative Division  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WORK CONTROLS WORK CONTROLS Assessment Plan Developed By NNSA/Nevada Site Office Facility Representative Division Performance Objective: Management should have an established work control process in place with authorized, controlled and documented methods that provide an accurate status of the work to be performed. Criteria: Work planning addresses applicable laws, codes and regulations. Work planning includes operational configuration constraints; material, tool, and manpower requirements; inter-organizational coordination; operational history; special training; safety considerations; hazards protection requirements; post-maintenance testing; quality control requirements; and other considerations as necessary. The work to be accomplished is defined by identifying the existing

49

Microsoft Word - FY09 Work Plan_External.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

sector sector NSTB National SCADA Test Bed U.S. Department of Energy Office of Electricity Delivery and Energy Reliability DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan (REVISED 07/31/2009) A plan of work for the National Laboratories that form the National SCADA Test Bed: Argonne National Laboratory Idaho National Laboratory Oak Ridge National Laboratory Pacific Northwest National Laboratory Sandia National Laboratories Fiscal Year 2 0 0 9 Work Plan NSTB FY 2009 Work Plan i FOREWORD The Department of Energy (DOE) Office of Electricity Delivery and Energy Reliability (OE) created the National SCADA Test Bed (NSTB) program with the mission to reduce the risk of energy disruptions due to cyber attack on control systems. So far the program's projects have

50

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

A-1. Location of the LEHR Site, UC Davis, Solano County, California U.S. Department of Energy LEHR Remedial DesignRemedial Action Work Plan November 2010 Doc. No. S05822-0.0...

51

Rad Monioring Subgroup Draft 1 Work Plan 020408  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 of 3 (Draft) Work Plan for the DOE TEC Rail Topic Group Radiation Monitoring Sub-Group Status: Active TEC Stakeholder Leads: Marty Vyenielo (PANE Task Force), Cort Richardson...

52

3.0 Work Planning and Authorization 0913  

NLE Websites -- All DOE Office Websites (Extended Search)

Work Work Planning and Authorization Integrated Safety Management tells us to plan work, analyze the hazards, ensure controls are in place, and obtain authorization before starting work. There are systems in place to help you do these things. Work Planning Before starting a new project, the first step is to think about what will be needed to get the job done: * Project scope and schedule Define what you are trying to accomplish and when it needs to be done. * People How many people and what types of skills will be needed? Do you already have the right people in your work group? Human Resources and AFRD management can help you find the right people. There may be people in other AFRD programs who can help. AFRD often partners with other Divisions (Advanced Light Source, Engineering, Materials Sciences, Environmental Energy

53

Chemical Hygiene Plan The purpose of the Chemical Hygiene Plan (CHP) is to outline laboratory work  

E-Print Network (OSTI)

Chemical Hygiene Plan I. Policy The purpose of the Chemical Hygiene Plan (CHP) is to outline community are protected from health hazards associated with chemicals with which they work. II. Authority The Chemical Hygiene Plan, required to comply with provisions of CCR Title 8 §5191 et al: A. Standard Operating

de Lijser, Peter

54

WIPP Facility Work Plan for Solid Waste Management Units  

Science Conference Proceedings (OSTI)

This Facility Work Plan (FWP) has been prepared as required by Module VII,Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a). This work plan describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current New Mexico Environment Department (NMED) guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to NMEDs guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The scope of work for the RFI Work Plan or SAP is being developed by the Permittees. The final content of the RFI Work Plan or SAP will be coordinated with the NMED for submittal on May 24, 2000. Specific project-related planning information will be included in the RFI Work Plan or SAP. The SWMU program at WIPP began in 1994 under U.S. Environmental Protection Agency (EPA) regulatory authority. NMED subsequently received regulatory authority from EPA. A Phase I RFI was completed at WIPP as part of a Voluntary Release Assessment (VRA). The risk-based decision criteria recommended by EPA for the VRA were contained in a proposed Corrective Action rule for SWMUs (EPA, 1990). EPA Region VI has issued new risk-based screening criteria applicable to the WIPP SWMUs and AOCs.

Washington TRU Solutions LLC

2000-02-25T23:59:59.000Z

55

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Remedial Design/Remedial Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 LMS/LEH/S05822-0.0 This page intentionally left blank LMS/LEH/S05822-0.0 Remedial Design/Remedial Action Work Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis November 2010 This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page i Contents Abbreviations ................................................................................................................................. iii 1.0 Introduction ........................................................................................................................1-1

56

Continuous observation planning for autonomous exploration  

E-Print Network (OSTI)

Many applications of autonomous robots depend on the robot being able to navigate in real world environments. In order to navigate or path plan, the robot often needs to consult a map of its surroundings. A truly autonomous ...

Hasegawa, Bradley R

2004-01-01T23:59:59.000Z

57

WIPP Facility Work Plan for Solid Waste Management Units  

Science Conference Proceedings (OSTI)

This 2001 Facility Work Plan (FWP) has been prepared as required by Module VII, Section VII.M.1 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit); (NMED, 1999a), and incorporates comments from the New Mexico Environment Department (NMED) received on December 6, 2000 (NMED, 2000a). This February 2001 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMUs) and Areas of Concern (AOCs) specified in the Permit. The permittees are evaluating data from previous investigations of the SWMUs and AOCs against the newest guidance proposed by the NMED. Based on these data, the permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a Facility to exit the schedule of compliance contained in the Facilitys Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit.

Washington TRU Solutions LLC

2001-02-25T23:59:59.000Z

58

Ladders of Insulating Material for Live Working: Research Plan  

Science Conference Proceedings (OSTI)

This report outlines a planned research and test program aimed at addressing concerns from field crews regarding undesirable mechanical behavior of insulating ladders used for live work, in particular regarding ladders that have been in service for some time. Long and spliced ladders can flex and twist, which could pose difficulties or safety issues to the worker on the ladder.BackgroundInsulating ladders for live work are made of insulating ...

2012-12-14T23:59:59.000Z

59

Climate VISION: Private Sector Initiatives: Business Roundtable: Work Plans  

Office of Scientific and Technical Information (OSTI)

Work Plans Work Plans Business Roundtable Logo Business Roundtable is an association of 160 leading CEOs of companies with 4.5 trillion dollars in annual revenue and employing nearly 10 million people. While we are leading the way on many fronts, our commitment to a sustainable future is our top priority. Our work on Climate RESOLVE (Responsible Environmental Steps, Opportunities to Lead by Voluntary Efforts), mobilizes the resources and expertise of the Roundtable member companies behind the goal of enhanced action to control greenhouse gas (GHG) emissions and improve the GHG intensity of the U.S. economy. We are pleased that the vast majority of our members are participating in Climate RESOLVE. A complete list of our Climate RESOLVE members is available on our website.

60

Tank waste remediation system multi-year work plan  

SciTech Connect

The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

Not Available

1994-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

WIPP Facility Work Plan for Solid Waste Management Units  

Science Conference Proceedings (OSTI)

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-02-14T23:59:59.000Z

62

FY 95 engineering work plan for the design reconstitution implementation action plan  

Science Conference Proceedings (OSTI)

Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities, a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.

Bigbee, J.D.

1994-11-09T23:59:59.000Z

63

Work plan, AP-102 mixer pump removal and pump replacement  

DOE Green Energy (OSTI)

The objective of this work plan is to plan the steps and estimate the costs required to remove the failed AP-102 mixer pump, and to plan and estimate the cost of the necessary design and specification work required to order a new, but modified, mixer pump including the pump and pump pit energy absorbing design. The main hardware required for the removal of the mixer is as follows: a flexible receiver and blast shield; a metal container for the pulled mixer pump; and a trailer and strongback to haul and manipulate the container. Additionally: a gamma scanning device will be needed to detect the radioactivity emanating from the mixer as it is pulled from the tank; a water spray system will be required to remove tank waste from the surface of the mixer as it is pulled from the AP-102 tank; and a lifting yoke to lift the mixer from the pump pit (the SY-101 Mixer Lifting Yoke will be used). A ``green house`` will have to be erected over the AP-102 pump pit and an experienced Hoisting and Rigging crew must be assembled and trained in mixer pump removal methods before the actual removal is undertaken.

Jimenez, R.F.

1994-09-01T23:59:59.000Z

64

In situ vitrification laboratory-scale test work plan  

SciTech Connect

The Buried Waste Program was established in October 1987 to accelerate the studies needed to develop a long-term management plan for the buried mixed waste at the Radioactive Waste Management Complex at Idaho Engineering Laboratory. The In Situ Vitrification Project is being conducted in a Comprehensive Environmental Response, Compensation, and Liability Act feasibility study format to identify methods for the long-term management of mixed buried waste. To support the overall feasibility study, the situ vitrification treatability investigations are proceeding along the three parallel paths: laboratory-scale tests, intermediate field tests, and field tests. Laboratory-scale tests are being performed to provide data to mathematical modeling efforts, which, in turn, will support design of the field tests and to the health and safety risk assessment. This laboratory-scale test work plan provides overall testing program direction to meet the current goals and objectives of the in situ vitrification treatability investigation. 12 refs., 1 fig., 7 tabs.

Nagata, P.K.; Smith, N.L.

1991-05-01T23:59:59.000Z

65

Rad Monioring Subgroup Draft 1 Work Plan 020408  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 of 3 1 of 3 (Draft) Work Plan for the DOE TEC Rail Topic Group Radiation Monitoring Sub-Group Status: Active TEC Stakeholder Leads: Marty Vyenielo (PA/NE Task Force), Cort Richardson (CSG-NE) DOE Lead: Alex Thrower (OCRWM) Contractor Support: John Smegal (Legin) Start Date: October 4, 2007 Purpose: The Transportation External Coordinating (TEC) Working Group's Rail Topic Group (RTG) provides stakeholder perspectives and feedback to the Office of National Transportation (ONT) in the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) and Environmental Management (EM) regarding topics of common interest concerning operating practices, logistical constraints, and other rail-related issues affecting the development and deployment of a safe, secure, and efficient system for

66

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Sample Collection Procedures Sample Collection Procedures This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page E-1 1.0 Sampling Methods Monitoring well samples will be collected according to Standard Operating Procedure 9.1, "Low-Flow Ground Water Sampling with Dedicated Pumps". A sample preparation area will be established adjacent to the well location. The work surface will be covered with plastic sheeting to minimize the potential spread of contamination. The following equipment will be staged in the sample-preparation area: * A spill kit, * Personal protective equipment, * Sample containers, * A decontamination station, * Bailers, * A wastewater drum, * Custody seals, and

67

FY 1992 work plan and technical progress reports  

SciTech Connect

The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

NONE

1992-11-01T23:59:59.000Z

68

Final work plan : environmental site investigation at Sylvan Grove, Kansas.  

SciTech Connect

In 1998, carbon tetrachloride was found above the maximum contaminant level (MCL) of 5 {micro}g/L in groundwater from one private livestock well at Sylvan Grove, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1998 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Sylvan Grove from 1954 to1966. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Sylvan Grove is located in western Lincoln County, approximately 60 mi west of Salina (Figure 1.1). To determine whether the former CCC/USDA facility at Sylvan Grove is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency (FSA) of the USDA. This Work Plan presents historical data related to previous investigations, grain storage operations, local private wells and public water supply (PWS) wells, and local geologic and hydrogeologic conditions at Sylvan Grove. The findings from a review of all available documents are discussed in Section 2. On the basis of the analyses of historical data, the following specific technical objectives are proposed for the site investigation at Sylvan Grove: (1) Evaluate the potential source of carbon tetrachloride at the former CCC/USDA facility; (2) Determine the relationship of potential contamination (if present) at the former CCC/USDA facility to contamination identified in 1998 in groundwater samples from one private well to the west; and (3) Delineate the extent of potential contamination associated with the former CCC/USDA facility. The detailed scope of work is outlined in Section 3. The results of the proposed work will provide the basis for determining what future CCC/USDA actions may be necessary, with the ultimate goal of achieving classification of the Sylvan Grove site at no further action status. The proposed activities are to be performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory, a nonprofit, multidisciplinary research center operated by the UChicago Argonne, LLC, for the U.S. Department of Energy. Argonne provides technical assistance to the CCC/USDA concerning environmental site characterization and remediation at former grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. That document should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Sylvan Grove.

LaFreniere, L. M. (Environmental Science Division)

2012-07-15T23:59:59.000Z

69

DOE/OE National SCADA Test Bed Fiscal Year 2009 Work Plan | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OE National SCADA Test Bed Fiscal Year 2009 Work Plan DOEOE National SCADA Test Bed Fiscal Year 2009 Work Plan This document is designed to help guide and strengthen the DOEOE...

70

Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1988.  

DOE Green Energy (OSTI)

The FY 1988 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1988. The Work Plan focuses on individual Action Items found in the amended Program for which Bonneville Power Administration (BPA) has determined it has authority and responsibility to implement. The FY 1988 Work Plan emphasizes continuation of 95 ongoing projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. These continuing activities are summarized briefly by Program area: (1) mainstem passage; (2) artificial propagation; (3) natural propagation; (4) resident fish and wildlife; and (5) planning activities.

United States. Bonneville Power Administration; Northwest Power Planning Council (U.S.); Columbia Basin Fish and Wildlife Authority

1987-10-01T23:59:59.000Z

71

Interim measure work plan/design for Agra, Kansas.  

Science Conference Proceedings (OSTI)

This Interim Measure Work Plan/Design (IMWP/D) is supplemental to the Argonne document Interim Measure Conceptual Design for Remediation of Source Area Contamination at Agra, Kansas. The IMWP/D includes information required by Kansas Department of Health and Environment (KDHE) Policy BER-RS-029, Policy and Scope of Work for Interim Measures. Specific to Policy BER-RS-029 is the requirement for several documents that will ensure that an adequate amount and type of data are collected for implementation of the IMWP/D and that data quality and safe conditions are prevailed. Such information is included in the IMWP/D as follows: Appendix A: Data Acquisition Plan--Design Testing Requirements; Appendix B: Basis of Design; Appendix C: Permits; Appendix D: Quality Assurance Project Plan; Appendix E: Health and Safety Plan; and Appendix F: Operations, Maintenance, and Monitoring Schedule. The proposed remedial technology for this project is the installation of five large-diameter boreholes (LDBs) in a source area that has been identified on the property formerly used for grain storage by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The goal of the LDB technology is the remediation of the source area by removal of mass quantities of contaminated soil from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. Secondary to the soil remediation is the remediation of groundwater at and adjacent to the source areas. The LDB technology serves the following purposes: (1) The physical removal of contaminated soil from the identified source area. (2) Replacement of less permeable native materials (silty clay, clayey silt, and silty sand) with more permeable materials to facilitate the capture of volatilized contaminants in the vertical borehole. (3) Removal of contaminants volatilized by air sparging (AS) and extracted from the vadose zone by soil vapor extraction (SVE). (4) Volatilization of contaminants from portions of the affected aquifer that can be accessed from the former CCC/USDA property. The primary objective of the proposed removal action is removal of mass quantities of carbon tetrachloride from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area, to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. This objective will be the basis for evaluating system performance. The scope of action outlined in the IMWP/D is limited to the five treatment zones defined by the LDB/SVE/AS locations. Surrounding soils and groundwater will benefit; however, remedial benefits to groundwater will be limited to the area of influence associated with the five treatment zones. While treatment should be aggressive in the vicinity of the LDB locations, the heterogeneity, clay content, and low permeability of the soils will place inherent limits on the area of influence.

LaFreniere, L. M.; Environmental Science Division

2008-11-18T23:59:59.000Z

72

Remedial Action Work Plan Amchitka Island Mud Pit Closures  

Science Conference Proceedings (OSTI)

This remedial action work plan presents the project organization and construction procedures developed for the performance of the remedial actions at U.S. Department of Energy (DOE's) sites on Amchitka Island, Alaska. During the late1960s and early 1970s, the U.S. Department of Defense and the U.S. Atomic Energy Commission (the predecessor agency to DOE) used Amchitka Island as a site for underground nuclear tests. A total of nine sites on the Island were considered for nuclear testing; however, tests were only conducted at three sites (i.e., Long Shot in 1965, Milrow in 1969, and Cannikin in 1971). In addition to these three sites, large diameter emplacement holes were drilled in two other locations (Sites D and F) and an exploratory hole was in a third location (Site E). It was estimated that approximately 195 acres were disturbed by drilling or preparation for drilling in conjunction with these activities. The disturbed areas include access roads, spoil-disposal areas, mud pits which have impacted the environment, and an underground storage tank at the hot mix plant which was used to support asphalt-paving operations on the island. The remedial action objective for Amchitka Island is to eliminate human and ecological exposure to contaminants by capping drilling mud pits, removing the tank contents, and closing the tank in place. The remedial actions will meet State of Alaska regulations, U.S. Fish and Wildlife Service refuge management goals, address stakeholder concerns, and address the cultural beliefs and practices of the native people. The U.S. Department of Energy, Nevada Operations Office will conduct work on Amchitka Island under the authority of the Comprehensive Emergency Response, Compensation, and Liability Act. Field activities are scheduled to take place May through September 2001. The results of these activities will be presented in a subsequent Closure Report.

DOE /NV

2001-04-05T23:59:59.000Z

73

Final work plan for targeted investigation at Hilton, Kansas.  

SciTech Connect

This Work Plan outlines the scope of a targeted investigation to update the status of carbon tetrachloride contamination in groundwater associated with grain storage operations at Hilton, Kansas. The Commodity Credit Corporation (CCC), an agency of the U.S. Department of Agriculture (USDA), operated a grain storage facility in Hilton during the 1950s and 1960s. At the time of the CCC/USDA operation in Hilton, grain storage facilities (CCC/USDA and private) were located along the both sides of the former Union Pacific railroad tracks (Figure 1.1). The main grain storage structures were on or near the railroad right-of-way. The proposed targeted investigation, to be conducted by Argonne National Laboratory on the behalf of CCC/USDA, will supplement Argonne's Phase I and Phase II investigations in 1996-1997. The earlier investigations erroneously focused on an area east of the railroad property where the CCC/USDA did not operate, specifically on a private grain storage facility. In addition, the investigation was limited in scope, because access to railroad property was denied (Argonne 1997a,b). The hydrogeologic system at Hilton is potentially complex.

LaFreniere, L. M.; Environmental Science Division

2007-08-28T23:59:59.000Z

74

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Travel Time Estimates for Constituents of Concern Travel Time Estimates for Constituents of Concern This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page C-1 Table C-1. Estimated Contaminant Migration Travel Time from DOE Areas to Monitoring Wells DOE Area Monitoring Well Distance from DOE Area Boundary to Monitoring Well (feet) Constituent Kd a (ml/g) Retardation factor b (unitless) Estimated Travel Time Range c (years) Domestic Septic System- 1 UCD1-071 15 Aluminum 9.9 55 28 276 Domestic Septic System- 3 UCD1-069 15 Formaldehyde 0.0018 1.0 0.50 5.0 15 Molybdenum 20 111 55 553 15 Nitrate 0 1.0 0.50 5.0 15 Aluminum 9.9 55 28 276 15 Silver 8.3 47 23 233 Domestic Septic System- 4 UCD1-068 60 Selenium 300 1,646 3,293 32,929

75

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Reporting Limits Reporting Limits This page intentionally left blank U.S. Department of Energy LEHR Remedial Design/Remedial Action Work Plan November 2010 Doc. No. S05822-0.0 Page F-1 Table F-1. Reporting Limits for Monitoring Parameters, DOE LEHR Parameter Method Reference Laboratory Reporting Limit MDL Units Aluminum EPA 6020A CalScience Environmental Lab 10.5 50 µg/L Antimony EPA 6020A CalScience Environmental Lab 1 0.38 µg/L Arsenic EPA 6020A CalScience Environmental Lab 1 0.589 µg/L Barium EPA 6020A CalScience Environmental Lab 1 0.105 µg/L Beryllium EPA 6020A CalScience Environmental Lab 1 0.131 µg/L Cadmium EPA 6020A CalScience Environmental Lab 1 0.266 µg/L Chromium, total EPA 6020A CalScience Environmental Lab 1 0.618 µg/L Cobalt EPA 6020A CalScience Environmental Lab 1 0.14 µg/L

76

UMTRA Project Site Observational Work Plan, Mexican Hat, Utah  

SciTech Connect

Surface cleanup activities at the Mexican Hat UMTRA processing site are nearing completion. Ground Water contamination at the Mexican Hat site is a result of uranium milling operations. The extent of residual process water has been identified, and it is limited to the uppermost aquifer in the vicinity of the site. Deeper aquifers are not affected because of an upward hydraulic gradient and the presence of a confining unit (the deeper aquifers are protected by hydrogeologic isolation). The uppermost unit is returning to its pre-milling, mainly unsaturated state. The unit that contains the contaminated water is not a ground water resource because it qualifies as Class III (limited use) based on limited yield. Ground water in the uppermost unit is currently not used and is not anticipated to be used as a ground water resource. The nearby San Juan River and a converted oil exploration well provide all of the water needs for the area. There are no current threats to human health or livestock; and, because the zone of contamination does not represent a ground water resource, none are anticipated in the future. There are, however, seeps where contaminated water is exposed at land surface. The seeps create potential exposure pathways for plants and wildlife. It is not known at this time if there is a risk to the environment. Additional investigations are needed and are described in this document to confirm the presence or absence of potential environmental risks. Additional hydrogeologic investigations are not required. The proposed ground water compliance strategy for the site is no remediation, because the ground water in the uppermost aquifer (which is also the zone of contamination) qualifies for supplemental standards based on Class III, limited yield, and because there are no threats to human health. Domestic and agricultural water is pumped from a deeper aquifer that is isolated from the contaminated zone.

Not Available

1994-09-01T23:59:59.000Z

77

Overview of Forest Observations in the GEOSS Work Plan  

E-Print Network (OSTI)

Land­surface climate int. Vegetation characteristics Weather Land­surface climate int. Vegetation of forest carbon (nationally and globally) · Engage user communities and networks not yet involved in GEO-07 Regional Networks for Ecosystems 7. US-06-02 Pilot Communities of Practice New task proposed: Forest Carbon

78

Final work plan for targeted investigation at Inman, Kansas.  

SciTech Connect

In 1997, low levels of carbon tetrachloride (below the maximum contaminant level [MCL] of 5 {micro}g/L) were detected in groundwater at Inman, Kansas, by the Kansas Department of Health and Environment (KDHE). The 1997 KDHE sampling was conducted under the U.S. Department of Agriculture (USDA) private well sampling program. The Commodity Credit Corporation (CCC), a USDA agency, operated a grain storage facility in Inman from 1954 to 1965. Carbon tetrachloride is the contaminant of primary concern at sites associated with former CCC/USDA grain storage operations. Inman is located in southwest McPherson County, approximately 10 mi southwest of the city of McPherson (Figure 1.1). To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA has agreed to conduct an investigation at Inman, in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA. For this work plan, Argonne compiled historical data related to the previous investigations and grain storage operations at Inman. Through a review of documents acquired from all available sources, other potential contaminant source areas (in addition to the former CCC/USDA facility) have been identified as (1) the commercial grain storage structures northwest of Inman, along the railroad right-of-way, and (2) small former private grain storage facilities west of Main Street and near the former CCC/USDA facility at the southern edge of Inman (Figure 1.2). Previous investigations and the potential source areas are discussed in Section 2.

LaFreniere, L. M.; Environmental Science Division

2007-11-05T23:59:59.000Z

79

Site Characterization Work Plan for Gasbuggy, New Mexico  

SciTech Connect

Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation activities will focus on the surface/shallow subsurface sampling and modeling. Suspected potential contaminants of concern for investigative analysis at the Gasbuggy Site include total petroleum hydrocarbons (diesel- and gasoline-range), volatile organic compounds, semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and radionuclides. The results of this characterization and risk assessment will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-site disposal of contaminated waste which will be presented in a subsequent corrective action decision document.

DOE /NV

2000-12-14T23:59:59.000Z

80

Liquid effluents program FY 1997 multi-year work plan  

Science Conference Proceedings (OSTI)

This document provides the technical baseline and work breakdown structure for the liquid effluents program.

Green, F.T.

1996-09-30T23:59:59.000Z

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Democratic Republic of Congo-ClimateWorks Low Carbon Growth Planning...  

Open Energy Info (EERE)

Growth Planning Support AgencyCompany Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development...

82

Nuclear Maintenance Applications Center: Maintenance Work Package Planning Guidance  

Science Conference Proceedings (OSTI)

The work management process is one of the core business processes outlined within the Nuclear Energy Institute (NEI) Standard Nuclear Performance Model for operation and maintenance of nuclear power plants. The preparation of work packages is a key element of this overall process. The purpose of this report is to provide guidance to power plant personnel regarding work package quality as a supplement to Institute of Nuclear Power Operations (INPO) AP-928, Work Management Process Description. The ...

2013-09-10T23:59:59.000Z

83

Maintenance Work Package Planning Guidance for Fossil Power Plant Personnel  

Science Conference Proceedings (OSTI)

The work management process is one of the core business processes for operation and maintenance of fossil power plants. The preparation of work packages is a key element of this overall process. The purpose of this report is to provide guidance to power plant personnel regarding work package quality, by providing a consistent approach for administrative control, achieving an appropriate level-of-detail, ensuring an acceptable level-of-use, work package format, and application.

2005-12-21T23:59:59.000Z

84

Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution, January 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Review of the Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background........................................................................................................................................... 1

85

DOE OIG Recovery Act Work Plan (FY 2011).xls  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OIG Recovery Act Plan Overview OIG Recovery Act Plan Overview OIG Name: Department of Energy Office of Inspector General OIG Broad Recovery Act Goals: The primary objective of the Office of Inspector General's oversight strategy involves the implementation of a review, evaluation, and investigation protocol designed to assist the Department of Energy in: (1) maximizing the performance and effectiveness of activities related to the Recovery Act; (2) preventing and detecting the fraudulent misuse of Recovery Act funds; and (3) identifying opportunities for cost savings in Recovery Act-related programs. OIG Broad Training and Outreach Recovery Act Goals: Since the passage of the Recovery Act, the Office of Inspector General has initiated an aggressive schedule to provide targeted fraud awareness briefings to

86

Incorporating ecological risk assessment into remedial investigation/feasibility study work plans  

SciTech Connect

This guidance document (1) provides instructions on preparing the components of an ecological work plan to complement the overall site remedial investigation/feasibility study (RI/FS) work plan and (2) directs the user on how to implement ecological tasks identified in the plan. Under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), and RI/FS work plan will have to be developed as part of the site-remediation scoping process. Specific guidance on the RI/FS process and the preparation of work plans has been developed by the US Environmental Protection Agency (EPA 1988a). This document provides guidance to US Department of Energy (DOE) staff and contractor personnel for incorporation of ecological information into environmental remediation planning and decision making at CERCLA sites.

Not Available

1994-06-01T23:59:59.000Z

87

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

under the supervision of an experienced geologist working under the supervision of a California-certified professional geologist. To be consistent with previous wells, the HSU-1...

88

Sandia Site Office Assessment of Activity-Levell Work Planning...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Center (FMOC) and Technical Area (TA) V and review of work activities at the Auxiliary Hot Cell Facility (AHCF), the Annular Core Research Reactor (ACRR), and the Gamma...

89

Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.  

DOE Green Energy (OSTI)

The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.

United States. Bonneville Power Administration. Division of Fish and Wildlife.

1988-11-01T23:59:59.000Z

90

Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution, January 2013  

NLE Websites -- All DOE Office Websites (Extended Search)

Independent Oversight Review of the Independent Oversight Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution January 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background........................................................................................................................................... 1

91

Single-shell tank closure work plan. Revision A  

SciTech Connect

In January 1994, the Hanford Federal Facility Agreement and Conset Order (Tri-Party Agreement) was amended to reflect a revised strategy for remediation of radioactive waste in underground storage tanks. These amendments include milestones for closure of the single-shell tank (SST) operable units, to be initiated by March 2012 and completed by September 2024. This SST-CWP has been prepared to address the principal topical areas identified in Tri-Party Agreement Milestone M-45-06 (i.e., regulatory pathway, operable unit characterization, waste retrieval, technology development, and a strategy for achieving closure). Chapter 2.0 of this SST-CWP provides a brief description of the environmental setting, SST System, the origin and characteristics of SST waste, and ancillary equipment that will be remediated as part of SST operable unit closure. Appendix 2A provides a description of the hydrogeology of the Hanford Site, including information on the unsaturated sediments (vadose zone) beneath the 200 Areas Plateau. Chapter 3.0 provides a discussion of the laws and regulations applicable to closure of the SST farm operable units. Chapter 4.0 provides a summary description of the ongoing characterization activities that best align with the proposed regulatory pathway for closure. Chapter 5.0 describes aspects of the SST waste retrieval program, including retrieval strategy, technology, and sequence, potential tank leakage during retrieval, and considerations of deployment of subsurface barriers. Chapter 6.0 outlines a proposed strategy for closure. Chapter 7.0 provides a summary of the programs underway or planned to develop technologies to support closure. Ca. 325 refs.

NONE

1995-06-01T23:59:59.000Z

92

Indonesia-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Indonesia-ClimateWorks Low Carbon Growth Planning Support Indonesia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Indonesia-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Indonesia South-Eastern Asia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

93

Papua New Guinea-ClimateWorks Low Carbon Growth Planning Support | Open  

Open Energy Info (EERE)

Papua New Guinea-ClimateWorks Low Carbon Growth Planning Support Papua New Guinea-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Papua New Guinea-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Papua New Guinea Melanesia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development

94

Brazil-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Brazil-ClimateWorks Low Carbon Growth Planning Support Brazil-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Brazil-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Brazil South America References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

95

Democratic Republic of Congo-ClimateWorks Low Carbon Growth Planning  

Open Energy Info (EERE)

Democratic Republic of Congo-ClimateWorks Low Carbon Growth Planning Democratic Republic of Congo-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Democratic Republic of Congo-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Democratic Republic of Congo Middle Africa References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development

96

Malaysia-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Malaysia-ClimateWorks Low Carbon Growth Planning Support Malaysia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Malaysia-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Malaysia South-Eastern Asia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

97

Guyana-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Guyana-ClimateWorks Low Carbon Growth Planning Support Guyana-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Guyana-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Guyana South America References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

98

Kenya-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

Kenya-ClimateWorks Low Carbon Growth Planning Support Kenya-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Kenya-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Kenya Eastern Africa References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

99

China-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

China-ClimateWorks Low Carbon Growth Planning Support China-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name China-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country China Eastern Asia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate impacts of climate change which they face. The central challenge is to enable all countries to strengthen delivery of their own development visions and goals through low-carbon, climate-resilient, or 'climate

100

Work plan addendum for the remedial investigation and feasibility study of the Salmon Site  

SciTech Connect

This document is intended as an addendum to the Remedial Investigation and Feasibility Study (RI/FS) Work Plan for the Salmon Site (SS) (formerly the Tatum Dome Test Site) Lamar County, Mississippi. The original work plan - Remedial Investigation and Feasibility Study of the Tatum Dome Test Site, Lamar County, Mississippi (herein after called the Work Plan) was approved by the state of Mississippi in 1992 and was intended as the operative document for investigative activities at the Tatum Dome Test Site. Subsequent to the approval of the document a series of activities were undertaken under the auspices of the work plan. This document is organized in the same manner as the original work plan: (1) Introduction; (2) Site Background and History; (3) Initial Evaluation; (4) Data Quality Objectives; (5) RI/FS Tasks; (6) Project Schedule; (7) Project Management; and (8) Reference. This addendum will identify changes to the original work plan that are necessary because of additional information acquired at the SS. This document is not intended to replace the work plan, rather, it is intended to focus the remaining work in the context of additional site knowledge gained since the development of the original work plan. The U.S. Department of Energy (DOE) is conducting a focused and phased site characterization as a part, of the RI/FS. The RI/FS is the methodology under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) for evaluating hazardous waste sites on the National Priorities List (NPL). The SS is not listed on the NPL, but DOE has voluntarily elected to conduct the evaluation of the SS in accordance with CERCLA.

NONE

1995-11-01T23:59:59.000Z

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

R&D Plan for the High Temperature Membrane Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan for the Plan for the High Temperature Membrane Working Group Introduction/Background The High Temperature Membrane Working Group was established to provide a forum for greater interaction in the effort to develop high temperature membranes for PEM fuel cells. The goal of this effort is particularly challenging and requires significant fundamental research and development. The Working Group meets twice a year (immediately before or after the Electrochemical Society meeting) and includes universities, national labs, small business and industry and is open to any interested individual/organization. The first meeting was in October, 2000. Working Group members are listed in Appendix A. This plan was developed to guide the R&D activities of the Working Group. The

102

Final work plan : investigation of potential contamination at the former USDA facility in Powhattan, Kansas.  

SciTech Connect

This Work Plan outlines the scope of work to be conducted to investigate the subsurface contaminant conditions at the property formerly leased by the Commodity Credit Corporation (CCC) in Powhattan, Kansas (Figure 1.1). Data obtained during this event will be used to (1) evaluate potential contaminant source areas on the property; (2) determine the vertical and horizontal extent of potential contamination; and (3) provide recommendations for future action, with the ultimate goal of assigning this site No Further Action status. The planned investigation includes groundwater monitoring requested by the Kansas Department of Health and Environment (KDHE), in accordance with Section V of the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the U.S. Department of Agriculture (USDA). The work is being performed on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. A nonprofit, multidisciplinary research center operated by the University of Chicago for the U.S. Department of Energy, Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at former CCC/USDA grain storage facilities. Argonne issued a Master Work Plan (Argonne 2002) that has been approved by the KDHE. The Master Work Plan describes the general scope of all investigations at former CCC/USDA facilities in Kansas and provides guidance for these investigations. It should be consulted for the complete details of plans for work associated with the former CCC/USDA facility at Powhattan.

LaFreniere, L. M.; Environmental Science Division

2007-02-02T23:59:59.000Z

103

Mexico-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Mexico-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Mexico-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Mexico Central America References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate

104

Ethiopia-ClimateWorks Low Carbon Growth Planning Support | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » Ethiopia-ClimateWorks Low Carbon Growth Planning Support Jump to: navigation, search Name Ethiopia-Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Ethiopia Eastern Africa References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to accelerate or maintain robust economic growth despite the disproportionate

105

ClimateWorks Low Carbon Growth Planning Support | Open Energy Information  

Open Energy Info (EERE)

Jump to: navigation, search Jump to: navigation, search Name Low Carbon Growth Planning Support Agency/Company /Organization ClimateWorks, Project Catalyst, McKinsey and Company Sector Energy, Land Topics Background analysis, Low emission development planning, Policies/deployment programs Country Brazil, China, Democratic Republic of Congo, Egypt, Ethiopia, Guyana, India, Indonesia, Kenya, Malaysia, Mexico, Papua New Guinea South America, Eastern Asia, Middle Africa, Northern Africa, Eastern Africa, South America, Southern Asia, South-Eastern Asia, Eastern Africa, South-Eastern Asia, Central America, Melanesia References LCGP support[1] Low Carbon Growth Plans Advancing Good Practice, August 2009[2] Overview "Achieving development goals depends on enabling poorer countries to

106

Long Range Plan Working Group Members | U.S. DOE Office of Science (SC)  

NLE Websites -- All DOE Office Websites (Extended Search)

Long Range Plan Working Group Members Long Range Plan Working Group Members Nuclear Science Advisory Committee (NSAC) NSAC Home Meetings Members Charges/Reports Charter .pdf file (629KB) NP Committees of Visitors NP Home Members Long Range Plan Working Group Members Print Text Size: A A A RSS Feeds FeedbackShare Page Baker, Keith Hampton University Lung, Allison JLAB Beene, Jim ORNL Marx, Jay LBNL Beise, Betsy University of Maryland McLerran, Larry BNL Bland, Les Indiana University Meyer, Curtis Carnegie-Mellon Bond, Peter BNL Milner, Richard MIT Bowles, Tom LANL Moss, Joel LANL Brenner, Daeg Clark University Mueller, Al Columbia Busza, Wit MIT Mueller, Berndt Duke University Cardman, Larry JLAB Natowitz, Joe Texas A&M Casten, Rick Yale University Nazarewicz, Witek Tennessee/ORNL Cates, Gordon University of Virginia Olinto, Angela

107

2007 Long Range Plan Working Group Members | U.S. DOE Office of Science  

NLE Websites -- All DOE Office Websites (Extended Search)

2007 Long Range Plan Working Group Members 2007 Long Range Plan Working Group Members Nuclear Science Advisory Committee (NSAC) NSAC Home Meetings Members Charges/Reports Charter .pdf file (629KB) NP Committees of Visitors NP Home Members 2007 Long Range Plan Working Group Members Print Text Size: A A A RSS Feeds FeedbackShare Page Beise, Elizabeth University of Maryland Merninga, Lia TJNAF Bryman, Douglas TRIUMF Meyer, Curtis Carnegie Mellon University Burrows, Adam University of Arizona Meziani, Zein-Eddine Temple University Cardman, Larry TJNAF Milner, Richard MIT Casten, Richard Yale University Mueller, Berndt Duke University Cates, Gordon University of Virginia Nazarewicz, Witold University of Tennessee Cizewski, Jolie Rutgers University Nitsche, Heino University of California Dean, David ORNL Norris, Margaret LBNL Deshpande, Abhay

108

RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3  

SciTech Connect

RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

Not Available

1993-12-01T23:59:59.000Z

109

Observability-based local path planning and obstacle avoidance using bearing-only measurements  

Science Conference Proceedings (OSTI)

In this paper we present an observability-based local path planning and obstacle avoidance technique that utilizes an extended Kalman Filter (EKF) to estimate the time-to-collision (TTC) and bearing to obstacles using bearing-only measurements. To ensure ... Keywords: Collision avoidance, Miniature air vehicle, Observability, Path planning

Huili Yu, Rajnikant Sharma, Randal W. Beard, Clark N. Taylor

2013-12-01T23:59:59.000Z

110

Six useful observations for designers of PBR plans  

SciTech Connect

This analysis of performance-based regulation (PBR) analyzes nine PBR plans implemented or proposed by {open_quotes}early - adopting{close_quotes} US electric utilities. Its principal finding is that, unless PBR plans are aggressive through their setting of minimum terms, deadbands, and productivity offsets, PBR may be no better than existing cost-of-service/rate-of-return (COS/ROR) regulation. Regulators and utilities are considering performance-based ratemaking of monopoly and partially competitive utility services as a replacement for the COS/ROR approach. If properly structured, PBR strengthens a utility`s financial incentives to lower rates or costs relative to traditional regulation by weakening the link between a utility`s regulated prices and its costs. This decoupling is accomplished by decreasing the frequency of rate cases, employing external measures of cost for the purpose of setting rates, or a combination of the two. In the United Kingdom in recent years, incentive regulation has been adopted for various types of public utilities, including electricity and natural gas transmission and distribution companies, water companies and airports. In the US, comprehensive incentive regulation has made the greatest inroads in the telecommunications industry. For electric utilities, most rate incentives previously have been limited to those that target fuel purchases or performance of individual power plants. However, recent proposals have been made for the comprehensive incentive regulation of US electric utilities.

Comnes, G.A. [Morse, Richard, Weisenmiller & Associates, Oakland, CA (United States); Stoft, S.; Greene, N. [Lawrence Berkeley National Lab., CA (United States); Hill, L. [Oak Ridge National Lab., TN (United States)

1996-04-01T23:59:59.000Z

111

Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 2  

SciTech Connect

The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. To address the facility-specific and site-specific vulnerabilities, responsible DOE and site-contractor line organizations have developed initial site response plans. These plans, presented as Volume 2 of this Management Response Plan, describe the actions needed to mitigate or eliminate the facility- and site-specific vulnerabilities identified by the CSV Working Group field verification teams. Initial site response plans are described for: Brookhaven National Lab., Hanford Site, Idaho National Engineering Lab., Lawrence Livermore National Lab., Los Alamos National Lab., Oak Ridge Reservation, Rocky Flats Plant, Sandia National Laboratories, and Savannah River Site.

Not Available

1994-09-01T23:59:59.000Z

112

Engineering work plan for container venting system drill press assembly troubleshooting. Revision 1  

SciTech Connect

This work plan is for troubleshooting the current CVS drill press to ensure that the drill bit assembly doesn`t bind in the press plate. A drill press assembly has been fabricated for the Container Venting System (CVS). The drill bit assembly has bound in the press plate in previous revisions of this design. Initial troubleshooting of the drill press per Rev. 0 of this work plan was performed at the 200W Kaiser Machine Shop under Work Package 2H9401670F, Internal Work Order E20027. The drill press operated without jamming. Then, during the pre-operational test on 11/14/17 and the operational test on 11/17/94, two drum lids were drilled. Immediately after the test on 11/17/94, the drill was again operated, and it jammed. An inspection found shavings at the bottom of the drill bit assembly, between the drill bit sleeve and the press plate bore. This revised work plan provides direction for the machine shop to diagnose and correct this recent problem.

Prather, M.C.

1994-11-01T23:59:59.000Z

113

Presentation to the EAC - Smart Grid Subcommittee Work Plan Status - Joe Paladino & Wanda Reder  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Smart Grid Subcommittee Smart Grid Subcommittee Work Plan Status Joe Paladino - DOE Wanda Reder - EAC Smart Grid Sub- Committee Chair June 12, 2012 * Considerations: - Build from resulting from ARRA SGIG/SGDP project results that were awarded ~two years ago - EAC Smart Grid Sub-Committee role defined in the 2007 Energy Independence and Security Act * Approach: - Met with DOE in January 2012, May 2012 - Conference calls and iterations with Committee and DOE staff - Participated in Peer Review - Build upon DOE activity underway * Philosophy: - Work closely with DOE staff to find ways for EAC to add value - User priorities to focus efforts throughout 2012 2012 Smart Grid Work Plan Approach SGIG Spending EPRI Estimate Brattle Group Estimate $7.9 billion with cost share to be spent through 2015

114

Remedial investigation work plan for the Groundwater Operable Unit at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan for the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

Not Available

1994-03-01T23:59:59.000Z

115

Fiscal year 1990 Rocky Flats Plant Environmental Restoration program Current-Year Work Plan  

SciTech Connect

The Rocky Flats Plant (RFP) is a nuclear weapons manufacturing facility currently operated by EG G for the US Department of Energy (DOE). RFP is located at the foot of the Rocky Mountains in Jefferson Country, Colorado. The Fiscal Year 1990 (FY90) Current-Year Work Plan (CYWP) is intended to serve as a guidance document for the Environmental Restoration (ER) and RCRA Compliance programs that will be implemented at RFP. The CYWP provides in one document any cross-references necessary to understand the interrelationships between the CYWP and the DOE Five-Year Plan (FYP), Site-Specific Plan (SSP), and other related documents. The scope of this plan includes comparison of planned FY90 ER activities to those actually achieved. The CYWP has been updated to include Colorado Department of Health (CDH), US Environmental Protection Agency (EPA), and DOE Inter-Agency Agreement ER activities. It addresses hazardous wastes, radioactive wastes, mixed wastes (radioactive and hazardous), and sanitary wastes. The CYWP also addresses facilities and sites contaminated with or used in management of those wastes.

Nielsen, T. (EG and G Rocky Flats, Inc., Golden, CO (USA)); Waage, E.; Miller, D. (Stoller (S.M.) Corp., Boulder, CO (USA))

1990-01-01T23:59:59.000Z

116

WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern  

Science Conference Proceedings (OSTI)

This 2002 Facility Work Plan (FWP) has been prepared as required by Module VII, Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received on December 6, 2000 (NMED, 2000a). This February 2002 FWP describes the programmatic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the most recent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may be used for any SWMU or AOC (NMED, 1998). This accelerated approach is used to replace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA processcan be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-03-05T23:59:59.000Z

117

WIPP Facility Work Plan for Solid Waste Management Units and Areas of Concern  

Science Conference Proceedings (OSTI)

his 2002 Facility Work Plan (FWP) has been prepared as required by Module VII,Permit Condition VII.U.3 of the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit, NM4890139088-TSDF (the Permit) (New Mexico Environment Department [NMED], 1999a), and incorporates comments from the NMED received onDecember 6, 2000 (NMED, 2000a). This February 2002 FWP describes the program-matic facility-wide approach to future investigations at Solid Waste Management Units (SWMU) and Areas of Concern (AOC) specified in the Permit. The Permittees are evaluating data from previous investigations of the SWMUs and AOCs against the mostrecent guidance proposed by the NMED. Based on these data, and completion of the August 2001 sampling requested by the NMED, the Permittees expect that no further sampling will be required and that a request for No Further Action (NFA) at the SWMUs and AOCs will be submitted to the NMED. This FWP addresses the current Permit requirements. It uses the results of previous investigations performed at WIPP and expands the investigations as required by the Permit. As an alternative to the Resource Conservation and Recovery Act (RCRA)Facility Investigation (RFI) specified in Module VII of the Permit, current NMED guidance identifies an Accelerated Corrective Action Approach (ACAA) that may beused for any SWMU or AOC (NMED, 1998). This accelerated approach is used toreplace the standard RFI Work Plan and Report sequence with a more flexible decision-making approach. The ACAA process allows a facility to exit the schedule of compliance contained in the facility's Hazardous and Solid Waste Amendments (HSWA) permit module and proceed on an accelerated time frame. Thus, the ACAA process can be entered either before or after an RFI Work Plan. According to the NMED's guidance, a facility can prepare an RFI Work Plan or Sampling and Analysis Plan (SAP) for any SWMU or AOC (NMED, 1998). Based on this guidance, a SAP constitutes an acceptable alternative to the RFI Work Plan specified in the Permit. The NMED accepted that the Permittees are using the ACAA in a letter dated April 20, 2000.

Washington TRU Solutions LLC

2002-03-05T23:59:59.000Z

118

Review of the Waste Isolation Pilot Plant Work Planning and Control Activities, April 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Review of the Independent Oversight Review of the Waste Isolation Pilot Plant Work Planning and Control Activities April 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Scope.................................................................................................................................................... 1 3.0 Background........................................................................................................................................... 1 4.0 Methodology......................................................................................................................................... 2

119

Generic Job and Task Analysis: Handling Planned Outages and Hot Line Work  

Science Conference Proceedings (OSTI)

Switching safety and reliability are ongoing concerns in the utility industry. This report summarizes the results of a generic job and task analysis for planned switching and tagging involving the deenergization of electric utility lines and equipment and for the switching and tagging associated with hot line work. The results of this job and task analysis provide utilities with an opportunity to compare their own practices with practices employed by other utilities.

2002-08-30T23:59:59.000Z

120

Engineering work plan for design requirements document, Project W-058/028  

SciTech Connect

This work plan outlines the tasks necessary for developing the Design Requirements Document (DRD) for project W-058/028, Replacement of Cross-Site Transfer System. The DRD is a specification which bounds, at a high level, the requirements of a discrete system element of the Tank Waste Remediation System (TWRS) Program. This document defines the scope and schedule for the development and production of the Design Requirements, Document for Project W-058.

Mendoza, D.P.

1994-01-05T23:59:59.000Z

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Assessment and control of water contamination associated with shale oil extraction and processing. Work plan  

SciTech Connect

The work plan for Los Alamos Scientific Laboratory's research on assessment and control of water contamination associated with shale oil extraction and processing is outlined. There are two tandem tasks in the program, a literature and information review and evaluation and an experimental effort. The experimental work will address environmental control technologies for retort and product water, contamination of ground water by abandoned in situ retorts, raw and spent shale leachates, fugitive emissions from background oil shale retorting, and aquifer bridging during or after shale oil extraction.

Wewerka, E.M.; Wagner, P.; Wanek, P.L.

1979-03-01T23:59:59.000Z

122

Final master work plan : environmental investigations at former CCC/USDA facilities in Kansas, 2002 revision.  

Science Conference Proceedings (OSTI)

The Commodity Credit Corporation (CCC) of the U.S. Department of Agriculture (USDA) has entered into an interagency agreement with the U.S. Department of Energy (DOE) under which Argonne National Laboratory provides technical assistance for hazardous waste site characterization and remediation for the CCC/USDA. Carbon tetrachloride is the contaminant of primary concern at sites in Kansas where former CCC/USDA grain storage facilities were located. Argonne applies its QuickSite(reg sign) Expedited Site Characterization (ESC) approach to these former facilities. The QuickSite environmental site characterization methodology is Argonne's proprietary implementation of the ESC process (ASTM 1998). Argonne has used this approach at several former CCC/USDA facilities in Kansas, including Agenda, Agra, Everest, and Frankfort. The Argonne ESC approach revolves around a multidisciplinary, team-oriented approach to problem solving. The basic features and steps of the QuickSite methodology are as follows: (1) A team of scientists with diverse expertise and strong field experience is required to make the process work. The Argonne team is composed of geologists, geochemists, geophysicists, hydrogeologists, chemists, biologists, engineers, computer scientists, health and safety personnel, and regulatory staff, as well as technical support staff. Most of the staff scientists are at the Ph.D. level; each has on average, more than 15 years of experience. The technical team works together throughout the process. In other words, the team that plans the program also implements the program in the field and writes the reports. More experienced scientists do not remain in the office while individuals with lesser degrees or experience carry out the field work. (2) The technical team reviews, evaluates, and interprets existing data for the site and the contaminants there to determine which data sets are technically valid and can be used in initially designing the field program. A basic mistake sometimes made in the site characterization process is failure to use technically sound available data to form working hypotheses on hydrogeology, contaminant distribution, etc. for initial testing. (3) After assembling and interpreting existing data for the site, the entire technical team visits the site to identify as a group the site characteristics that might prohibit or enhance any particular technological approach. Logistic and community constraints are also identified at this point. (4) After the field visit, the team selects a suite of technologies appropriate to the problem and completes the design of the field program. No one technique works well at all sites, and a suite of techniques is necessary to delineate site features fully. In addition, multiple technologies are employed to increase confidence in conclusions about site features. Noninvasive and minimally invasive technologies are emphasized to minimize risk to the environment, the community, and the staff. In no case is the traditional approach of installing a massive number of monitoring wells followed. A dynamic work plan that outlines the program is produced for the sponsoring and regulatory agencies. The word ''dynamic'' is emphasized because the work plan is viewed as a guide, subject to modification, for the site characterization activity, rather than a document that is absolute and unchangeable. Therefore, the health and safety plan and the quality assurance/quality control plan must be broad and encompass all possible alterations to the plan. The cooperation of the regulating agency is essential in successful implementation of this process. The sponsoring and regulatory agencies are notified if significant changes to the site-specific work plan are necessary. (5) The entire team participates in the technical field program. Several technical activities are undertaken simultaneously. These may range from different surface geophysics investigations to vegetation sampling. Data from the various activities are reduced and interpreted each day by the technical staff. Various computer prog

Burton, J. C.; Environmental Research

2003-01-23T23:59:59.000Z

123

Feature extraction for decision-theoretic planning in partially observable environments  

Science Conference Proceedings (OSTI)

In this article, we propose a feature extraction technique for decision-theoretic planning problems in partially observable stochastic domains and show a novel approach for solving them. To maximize an expected future reward, all the agent has to do ...

Hajime Fujita; Yutaka Nakamura; Shin Ishii

2006-09-01T23:59:59.000Z

124

A Cirrus-Cloud Experiment: Intensive Field Observations Planned for Fire  

Science Conference Proceedings (OSTI)

Plans for an intensive cirrus-cloud field experiment are described. The Cirrus Intensive Field Observations (Citrus IFO) is a major component of the First ISCCP (International Satellite Cloud Climatology Project) Regional Experiment (FIRE). The ...

David O'C. Starr

1987-02-01T23:59:59.000Z

125

Phase 1 RCRA Facility Investigation & Corrective Measures Study Work Plan for Single Shell Tank (SST) Waste Management Areas  

SciTech Connect

This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) Corrective Action Program (RCAP) for single-shell tank (SST) farms at the US. Department of Energy's (DOE'S) Hanford Site. The DOE Office of River Protection (ORP) initiated the RCAP to address the impacts of past and potential future tank waste releases to the environment. This work plan defines RCAP activities for the four SST waste management areas (WMAs) at which releases have contaminated groundwater. Recognizing the potential need for future RCAP activities beyond those specified in this master work plan, DOE has designated the currently planned activities as ''Phase 1.'' If a second phase of activities is needed for the WMAs addressed in Phase 1, or if releases are detected at other SST WMAs, this master work plan will be updated accordingly.

MCCARTHY, M.M.

1999-08-01T23:59:59.000Z

126

Site Specific Single Shell Tank (SST) phase 1 RFI and CMS Work Plan Addendum for Waste Management B-BX-BY  

SciTech Connect

This site-specific work plan addendum for WMA B-BX-BY addresses vadose zone characterization plans for collecting and analyzing sediment samples.

ROGERS, P.M.

2000-05-19T23:59:59.000Z

127

Demonstration testing and evaluation of in situ soil heating. Treatability study work plan (Revision 2)  

SciTech Connect

A Treatability Study planned for the demonstration of the in situ electromagnetic (EM) heating process to remove organic solvents is described in this Work Plan. The treatability study will be conducted by heating subsurface vadose-zone soils in an organic plume adjacent to the Classified Burial Ground K-1070-D located at K-25 Site, Oak Ridge. The test is scheduled to start during the fourth quarter of FY94 and will be completed during the first quarter of FY95. Over the last nine years, a number of Government agencies (EPA, Army, AF, and DOE) and industries sponsored further development and testing of the in situ heating and soil decontamination process for the remediation of soils containing hazardous organic contaminants. In this process the soil is heated in situ using electrical energy. The contaminants are removed from the soil due to enhanced vaporization, steam distillation and stripping. IITRI will demonstrate the EM Process for in situ soil decontamination at K-25 Site under the proposed treatability study. Most of the contaminants of concern are volatile organics which can be removed by heating the soil to a temperature range of 85{degrees} to 95{degrees}C. The efficiency of the treatment will be determined by comparing the concentration of contaminants in soil samples. Samples will be obtained before and after the demonstration for a measurement of the concentration of contaminants of concern. This document is a Treatability Study Work Plan for the demonstration program. The document contains a description of the proposed treatability study, background of the EM heating process, description of the field equipment, and demonstration test design.

Sresty, G.C.

1994-12-30T23:59:59.000Z

128

Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory  

Science Conference Proceedings (OSTI)

The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S&M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S&M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the IFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of IFDP facilities was initiated in FY 1994 and will be completed in FY 1999. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $36M. The costs are summarized. Upon completion of deactivation, annual S&M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

NONE

1995-05-01T23:59:59.000Z

129

Work plan for the Isotopes Facilities Deactivation Project at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

The purpose of the Isotopes Facilities Deactivation Project (IFDP) is to place former isotopes production facilities at the Oak Ridge National Laboratory in a safe, stable, and environmentally sound condition; suitable for an extended period of minimum surveillance and maintenance (S and M) and as quickly and economical as possible. Implementation and completion of the deactivation project will further reduce the risks to the environment and to public safety and health. Furthermore, completion of the project will result in significant S and M cost savings in future years. The IFDP work plan defines the project schedule, the cost estimate, and the technical approach for the project. A companion document, the EFDP management plan, has been prepared to document the project objectives, define organizational relationships and responsibilities, and outline the management control systems to be employed in the management of the project. The project has adopted the strategy of deactivating the simple facilities first, to reduce the scope of the project and to gain experience before addressing more difficult facilities. A decision support system is being developed to identify the activities that best promote the project mission and result in the largest cost savings. This work plan will be reviewed and revised annually. Deactivation of EFDP Facilities was initiated in FY 1994 and will be completed in FY 2000. The schedule for deactivation of facilities is shown. The total cost of the project is estimated to be $51M. The costs are summarized. Upon completion of deactivation, annual S and M costs of these facilities will be reduced from the current level of $5M per year to less than $1M per year.

NONE

1995-08-01T23:59:59.000Z

130

RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington  

Science Conference Proceedings (OSTI)

The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

Not Available

1993-06-01T23:59:59.000Z

131

Work plan for the remedial investigation/feasibility study for the groundwater operable units at the Chemical Plant Area and the Ordnance Works Area, Weldon Spring, Missouri  

Science Conference Proceedings (OSTI)

US Department of Energy (DOE) and the US Army Corps of Engineers (CE) are conducting cleanup activities at two properties, the chemical plant area and the ordnance works area, located adjacent to one another in St. Charles County, Missouri. In accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, DOE and CE are evaluating conditions and potential responses at the chemical plant area and at the ordnance works area, respectively, to address groundwater and surface water contamination. This work plan provides a comprehensive evaluation of areas that are relevant to the (GWOUs) of both the chemical plant and the ordnance works area. Following areas or media are addressed in this work plan: groundwater beneath the chemical plant area (including designated vicinity properties described in Section 5 of the RI for the chemical plant area [DOE 1992d]) and beneath the ordnance works area; surface water and sediment at selected springs, including Burgermeister Spring. The organization of this work plan is as follows: Chapter 1 discusses the objectives for conducting the evaluation, including a summary of relevant site information and overall environmental compliance activities to be undertaken; Chapter 2 presents a history and a description of the site and areas addressed within the GWOUs, along with currently available data; Chapter 3 presents a preliminary evaluation of areas included in the GWOUs, which is based on information given in Section 2, and discusses data requirements; Chapter 4 presents rationale for data collection or characterization activities to be carried out in the remedial investigation (RI) phase, along with brief summaries of supporting documents ancillary to this work plan; Chapter 5 discusses the activities planned for GWOUs under each of the 14 tasks for an remedial (RI/FS); Chapter 6 presents proposed schedules for RI/FS for the GWOUS; and Chapter 7 explains the project management structure.

NONE

1995-08-01T23:59:59.000Z

132

Analytical Services Fiscal Year 1996 Multi-year Program Plan Fiscal Year Work Plan WBS 1.5.1, Revision 1  

SciTech Connect

This document contains the Fiscal Year 1996 Work Plan and Multi-Year Program Plan for the Analytical Services Program at the Hanford Reservation in Richland, Washington. The Analytical Services Program provides vital support to the Hanford Site mission and provides technically sound, defensible, cost effective, high quality analytical chemistry data for the site programs. This report describes the goals and strategies for continuance of the Analytical Services Program through fiscal year 1996 and beyond.

NONE

1995-09-01T23:59:59.000Z

133

Environmental restoration risk-based prioritization work package planning and risk ranking methodology. Revision 2  

Science Conference Proceedings (OSTI)

This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS), Paducah Gaseous Diffusion Plant (PGDP), Oak Ridge National Laboratory (ORNL), and the Oak Ridge Y-12 Plant (Y-12)], the ER Off-site Program, and Central ER. This prioritization methodology was developed to support the increased rigor and formality of work planning in the overall conduct of operations within the DOE-ORO ER Program. Prioritization is conducted as an integral component of the fiscal ER funding cycle to establish program budget priorities. The purpose of the ER risk-based prioritization methodology is to provide ER management with the tools and processes needed to evaluate, compare, prioritize, and justify fiscal budget decisions for a diverse set of remedial action, decontamination and decommissioning, and waste management activities. The methodology provides the ER Program with a framework for (1) organizing information about identified DOE-ORO environmental problems, (2) generating qualitative assessments of the long- and short-term risks posed by DOE-ORO environmental problems, and (3) evaluating the benefits associated with candidate work packages designed to reduce those risks. Prioritization is conducted to rank ER work packages on the basis of the overall value (e.g., risk reduction, stakeholder confidence) each package provides to the ER Program. Application of the methodology yields individual work package ``scores`` and rankings that are used to develop fiscal budget requests. This document presents the technical basis for the decision support tools and process.

Dail, J.L.; Nanstad, L.D.; White, R.K.

1995-06-01T23:59:59.000Z

134

NEAMS Software Licensing, Release, and Distribution: Implications for FY2013 Work Package Planning  

Science Conference Proceedings (OSTI)

The vision of the NEAMS program is to bring truly predictive modeling and simulation (M&S) capabilities to the nuclear engineering community in order to enable a new approach to the analysis of nuclear systems. NEAMS anticipates issuing in FY 2018 a full release of its computational 'Fermi Toolkit' aimed at advanced reactor and fuel cycles. The NEAMS toolkit involves extensive software development activities, some of which have already been underway for several years, however, the Advanced Modeling and Simulation Office (AMSO), which sponsors the NEAMS program, has not yet issued any official guidance regarding software licensing, release, and distribution policies. This motivated an FY12 task in the Capability Transfer work package to develop and recommend an appropriate set of policies. The current preliminary report is intended to provide awareness of issues with implications for work package planning for FY13. We anticipate a small amount of effort associated with putting into place formal licenses and contributor agreements for NEAMS software which doesn't already have them. We do not anticipate any additional effort or costs associated with software release procedures or schedules beyond those dictated by the quality expectations for the software. The largest potential costs we anticipate would be associated with the setup and maintenance of shared code repositories for development and early access to NEAMS software products. We also anticipate an opportunity, with modest associated costs, to work with the Radiation Safety Information Computational Center (RSICC) to clarify export control assessment policies for software under development.

Bernholdt, David E [ORNL

2012-06-01T23:59:59.000Z

135

Management response plan for the Chemical Safety Vulnerability Working Group report. Volume 1  

SciTech Connect

The Chemical Safety Vulnerability (CSV) Working Group was established to identify adverse conditions involving hazardous chemicals at DOE facilities that might result in fires or explosions, release of hazardous chemicals to the environment, or exposure of workers or the public to chemicals. A CSV Review was conducted in 146 facilities at 29 sites. Eight generic vulnerabilities were documented related to: abandoned chemicals and chemical residuals; past chemical spills and ground releases; characterization of legacy chemicals and wastes; disposition of legacy chemicals; storage facilities and conditions; condition of facilities and support systems; unanalyzed and unaddressed hazards; and inventory control and tracking. Weaknesses in five programmatic areas were also identified related to: management commitment and planning; chemical safety management programs; aging facilities that continue to operate; nonoperating facilities awaiting deactivation; and resource allocations. Volume 1 contains a discussion of the chemical safety improvements planned or already underway at DOE sites to correct facility or site-specific vulnerabilities. The main part of the report is a discussion of each of the programmatic deficiencies; a description of the tasks to be accomplished; the specific actions to be taken; and the organizational responsibilities for implementation.

Not Available

1994-09-01T23:59:59.000Z

136

Microsoft Word - Security TG Work Plan 8-7-06.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7/2006 7/2006 Page 1 of 5 WORK PLAN FOR THE DOE TEC SECURITY TOPIC GROUP (STG) Status: Active DOE Leads: Office of Civilian Radioactive Waste Management (OCRWM), Office of Logistics Management (OLM), Alex Thrower Start Date: September 21, 2004 Purpose: The purpose of the Security Topic Group (STG) is to assist the Office of Civilian Radioactive Waste Management (OCRWM) in developing an approach for effective safeguards and security of nuclear waste shipments to Yucca Mountain, Nevada. This approach will incorporate best practices and lessons learned from previous domestic and international nuclear waste shipments, with special emphasis on substantive contributions from the State, Tribal, and local governments that will be involved in these shipments.

137

Remedial Investigation Work Plan for J-Field, Aberdeen Proving Ground, Maryland  

Science Conference Proceedings (OSTI)

The purpose of an RI/FS is to characterize the nature and extent of the risks posed by contaminants present at a site and to develop and evaluate options for remedial actions. The overall objective of the RI is to provide a comprehensive evaluation of site conditions, types and quantities of contaminants present, release mechanisms and migration pathways, target populations, and risks to human health and the environment. The information developed during the RI provides the basis for the design and implementation of remedial actions during the FS. The purpose of this RI Work Plan is to define the tasks that will direct the remedial investigation of the J-Field site at APG.

Benioff, P.; Biang, R.; Dolak, D.; Dunn, C.; Haffenden, R.; Martino, L.; Patton, T.; Wang, Y.; Yuen, C.

1995-03-01T23:59:59.000Z

138

Work plan for conducting an ecological risk assessment at J-Field, Aberdeen Proving Ground, Maryland  

Science Conference Proceedings (OSTI)

The Environmental Management Division of Aberdeen Proving Ground (APG), Maryland, is conducting a remedial investigation and feasibility study (RI/FS) of the J-Field area at APG pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. J-Field is within the Edgewood Area of APG in Harford County, Maryland, and activities at the Edgewood Area since World War II have included the development, manufacture, testing, and destruction of chemical agents and munitions. The J-Field site was used to destroy chemical agents and munitions by open burning and open detonation. This work plan presents the approach proposed to conduct an ecological risk assessment (ERA) as part of the RI/FS program at J-Field. This work plan identifies the locations and types of field studies proposed for each area of concern (AOC), the laboratory studies proposed to evaluate toxicity of media, and the methodology to be used in estimating doses to ecological receptors and discusses the approach that will be used to estimate and evaluate ecological risks at J-Field. Eight AOCs have been identified at J-Field, and the proposed ERA is designed to evaluate the potential for adverse impacts to ecological receptors from contaminated media at each AOC, as well as over the entire J-Field site. The proposed ERA approach consists of three major phases, incorporating field and laboratory studies as well as modeling. Phase 1 includes biotic surveys of the aquatic and terrestrial habitats, biological tissue sampling and analysis, and media toxicity testing at each AOC and appropriate reference locations. Phase 2 includes definitive toxicity testing of media from areas of known or suspected contamination or of media for which the Phase 1 results indicate toxicity or adverse ecological effects. In Phase 3, the uptake models initially developed in Phase 2 will be finalized, and contaminant dose to each receptor from all complete pathways will be estimated.

Hlohowskyj, I.; Hayse, J.; Kuperman, R. [Argonne National Lab., IL (United States). Environmental Assessment Div.] [and others

1995-03-01T23:59:59.000Z

139

The Removal Action Work Plan for CPP-603A Basin Facility  

SciTech Connect

This revised Removal Action Work Plan describes the actions to be taken under the non-time-critical removal action recommended in the Action Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center, as evaluated in the Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center. The regulatory framework outlined in this Removal Action Work Plan has been modified from the description provided in the Engineering Evaluation/Cost Analysis (DOE/NE-ID-11140, Rev. 1, August 2004). The modification affects regulation of sludge removal, treatment, and disposal, but the end state and technical approaches have not changed. Revision of this document had been delayed until the basin sludge was successfully managed. This revision (Rev. 1) has been prepared to provide information that was not previously identified in Rev. 0 to describe the removal, treatment, and disposal of the basin water at the Idaho National Laboratory (INL) CERCLA Disposal Facility evaporation ponds and fill the basins with grout/controlled low strength material (CLSM) was developed. The Engineering Evaluation/Cost Analysis for the CPP-603A Basin Non-Time Critical Removal Action, Idaho Nuclear Technology and Engineering Center - conducted pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act - evaluated risks associated with deactivation of the basins and alternatives for addressing those risks. The decision to remove and dispose of the basin water debris not containing uranium grouted in place after the sludge has been removed and managed under the Hazardous Waste Management Act/Resource Conservation and Recovery Act has been documented in the Act Memorandum for the Non-Time Critical Removal Action at the CPP-603A Basins, Idaho Nuclear Technology and Engineering Center.

B. T. Richards

2006-06-05T23:59:59.000Z

140

Human Health and Ecological Risk Assessment Work Plan Mud Pit Release Sites, Amchitka Island, Alaska  

SciTech Connect

This Work Plan describes the approach that will be used to conduct human health and ecological risk assessments for Amchitka Island, Alaska, which was utilized as an underground nuclear test site between 1965 and 1971. During this period, the U.S. Atomic Energy Commission (now the U.S. Department of Energy) conducted two nuclear tests (known as Long Shot and Milrow) and assisted the U.S. Department of Defense with a third test (known as Cannikin). Amchitka Island is approximately 42 miles long and located 1,340 miles west-southwest of Anchorage, Alaska, in the western end of the Aleutian Island archipelago in a group of islands known as the Rat Islands. Historically including deep drilling operations required large volumes of drilling mud, a considerable amount of which was left on the island in exposed mud pits after testing was completed. Therefore, there is a need for drilling mud pit remediation and risk assessment of historical mud pit releases. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the constituents in soil, surface water, and sediment at these former testing sites. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate what further remedial action is required to achieve permanent closure of these three sites that will protect both human health and the environment. Suspected compounds of potential ecological concern for investigative analysis at these sites include diesel-range organics, polyaromatic hydrocarbons, polychlorinated biphenyls, volatile organic compounds, and chromium. The results of these characterizations and risk assessments will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-sit e disposal of contaminated waste. The results of this evaluation will be presented in a subsequent corrective action decision document.

DOE /NV

2001-03-12T23:59:59.000Z

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Addendum to the East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan Oak Ridge, Tennessee  

SciTech Connect

The East Tennessee Technology Park Site-Wide Residual Contamination Remedial Investigation Work Plan (DOE 2004) describes the planned fieldwork to support the remedial investigation (RI) for residual contamination at the East Tennessee Technology Park (ETTP) not addressed in previous Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) decisions. This Addendum describes activities that will be conducted to gather additional information in Zone 1 of the ETTP for groundwater, surface water, and sediments. This Addendum has been developed from agreements reached in meetings held on June 23, 2010, August 25, 2010, October 13, 2010, November 13, 2010, December 1, 2010, and January 13, 2011, with representatives of the U. S. Department of Energy (DOE), U. S. Environmental Protection Agency (EPA), and Tennessee Department of Environment and Conservation (TDEC). Based on historical to recent groundwater data for ETTP and the previously completed Sitewide Remedial Investigation for the ETTP (DOE 2007a), the following six areas of concern have been identified that exhibit groundwater contamination downgradient of these areas above state of Tennessee and EPA drinking water maximum contaminant levels (MCLs): (1) K-720 Fly Ash Pile, (2) K-770 Scrap Yard, (3) Duct Island, (4) K-1085 Firehouse Burn/J.A. Jones Maintenance Area, (5) Contractor's Spoil Area (CSA), and (6) Former K-1070-A Burial Ground. The paper presents a brief summary of the history of the areas, the general conceptual models for the observed groundwater contamination, and the data gaps identified.

SAIC

2011-04-01T23:59:59.000Z

142

Engineering work plan for PFP criticality alarm panel first unit re-build  

SciTech Connect

This document describes the first step in increasing the quality, reliability, and ease of maintenance of the nine Criticality Alarm Panels (CAP) at PFP. Development control practices and guidelines of WHC-CM-6-1, EP-2.4 and WHC-IP-1026, EPG-2.4 are applied to develop a prototype of a replacement Criticality Alarm Panel (CAP) with facility-use potential. During the development of the prototype CAP, the design requirements of all of PFP`s nine CAPs are considered to develop standardized hardware and detailed design drawings that are tailored to PFP maintenance needs. Increased quality and reliability is achieved through quality hardware, proven technology and design techniques, and the use of the Class 1E workmanship standards of WHC-CM-8-1. The end result of the work described by this work plan is a verified/read-to-install replacement for CAP Z4 and verified/released H-2 drawings that are formatted such that they can easily be replicated when producing design drawings for the other eight CAPs.

Clem, W.E.

1994-09-14T23:59:59.000Z

143

Demonstration testing and evaluation of in situ soil heating. Treatability study work plan, Revision 1  

SciTech Connect

A Treatability Study planned for the demonstration of the in situ electromagnetic (EM) heating process to remove organic solvents is described in this Work Plan. The treatability study will be conducted by heating subsurface vadose-zone soils in an organic plume adjacent to the Classified Burial Ground K-1070-D located at K-25 Site, Oak Ridge. The test is scheduled to start during the fourth quarter of FY94 and will be completed during the first quarter of FY95. The EM heating process for soil decontamination is based on volumetric heating technologies developed during the `70s for the recovery of fuels from shale and tar sands by IIT Research Institute (IITRI) under a co-operative program with the US Department of Energy (DOE). Additional modifications of the technology developed during the mid `80s are currently used for the production of heavy oil and waste treatment. Over the last nine years, a number of Government agencies (EPA, Army, AF, and DOE) and industries sponsored further development and testing of the in situ heating and soil decontamination process for the remediation of soils containing hazardous organic contaminants. In this process the soil is heated in situ using electrical energy. The contaminants are removed from the soil due to enhanced vaporization, steam distillation and stripping. IITRI will demonstrate the EM Process for in situ soil decontamination at K-25 Site under the proposed treatability study. Most of the contaminants of concern are volatile organics which can be removed by heating the soil to a temperature range of 85 to 95 C. The efficiency of the treatment will be determined by comparing the concentration of contaminants in soil samples. Samples will be obtained before and after the demonstration for a measurement of the concentration of contaminants of concern.

Sresty, G.C.

1994-07-07T23:59:59.000Z

144

Integration of Nevada Test Site (NTS) Work Control Programs and Incorporating Integrated Safety Management (ISM) into Activity Level Work Planning and Control  

SciTech Connect

This session will examine a method developed by Federal and Contractor personnel at the Nevada Site Office (NSO) to improve the planning and execution of work activities utilizing an Activity Level Work Control process in response to Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2004-1, Oversight of Complex, High-Hazard Nuclear Operations. The process was initially developed during Fiscal Year (FY) 2007, and implementation is commencing during the fourth quarter of FY 2008. This process will significantly enhance the flexibility and the appropriate rigor in the performance of work activities.

Mike Kinney and Kevin Breen

2008-08-30T23:59:59.000Z

145

Operable Unit 7-13/14 in situ thermal desorption treatability study work plan  

SciTech Connect

This Work Plan provides technical details for conducting a treatability study that will evaluate the application of in situ thermal desorption (ISTD) to landfill waste at the Subsurface Disposal Area (SDA) at the Idaho National Engineering and Environmental Laboratory (INEEL). ISTD is a form of thermally enhanced vapor vacuum extraction that heats contaminated soil and waste underground to raise its temperature and thereby vaporize and destroy most organics. An aboveground vapor vacuum collection and treatment system then destroys or absorbs the remaining organics and vents carbon dioxide and water to the atmosphere. The technology is a byproduct of an advanced oil-well thermal extraction program. The purpose of the ISTD treatability study is to fill performance-based data gaps relative to off-gas system performance, administrative feasibility, effects of the treatment on radioactive contaminants, worker safety during mobilization and demobilization, and effects of landfill type waste on the process (time to remediate, subsidence potential, underground fires, etc.). By performing this treatability study, uncertainties associated with ISTD as a selected remedy will be reduced, providing a better foundation of remedial recommendations and ultimate selection of remedial actions for the SDA.

Shaw, P.; Nickelson, D.; Hyde, R.

1999-05-01T23:59:59.000Z

146

Working Group Reports Summary of Single-Column Model Intensive Observation  

NLE Websites -- All DOE Office Websites (Extended Search)

Working Group Reports Summary of Single-Column Model Intensive Observation Period Workshop at Annual Atmospheric Radiation Measurement Science Team Meeting D. A. Randall Department of Atmospheric Science Colorado State University Fort Collins, Colorado R. T. Cederwall Lawrence Livermore National Laboratory Livermore, California * Study previous observation simulation system experiments (OSSEs) (i.e., Bill Frank, Pennsylvania State University [PSU]) and conduct OSSEs as necessary to evaluate data network. * Implement additional "boundary" facilities and investigate possible interim capabilities for upcoming SCM IOPs. * Improve resolution of wind profiles observed in lowest 1 km, using data sources such as towers of opportunity, doppler sodar, and doppler radar.

147

Site Characterization Work Plan for the Gnome-Coach Site, New Mexico (Rev. 1, January 2002)  

SciTech Connect

Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. The Plowshare Program focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961 with the Salado Formation. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1972. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is located approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which approximately 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

2002-01-14T23:59:59.000Z

148

Site Characterization Work Plan for Gnome-Coach Site, New Mexico  

Science Conference Proceedings (OSTI)

Project Gnome was the first nuclear experiment conducted under the U.S. Atomic Energy Commission (AEC), predecessor to the U.S. Department of Energy (DOE), Plowshare Program. Gnome was part of a joint government-industry experiment focused on developing nuclear devices exclusively for peaceful purposes. The intent of the Gnome experiment was to evaluate the effects of a nuclear detonation in a salt medium. Historically, Project Gnome consisted of a single detonation of a nuclear device on December 10, 1961. Since the Gnome detonation, the AEC/DOE has conducted surface restoration, site reconnaissance, and decontamination and decommissioning activities at the site. In addition, annual groundwater sampling is performed under a long-term hydrological monitoring program begun in 1980. Coach, an experiment to be located near the Gnome project, was initially scheduled for 1963. Although construction and rehabilitation were completed for Coach, the experiment was canceled and never executed. Known collectively as Project Gnome-Coach, the site is situated within the Salado Formation approximately 25 miles east of Carlsbad, New Mexico, in Eddy County, and is comprised of nearly 680 acres, of which 60 acres are disturbed from the combined AEC/DOE operations. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the project. The subsurface at the Gnome-Coach site has two contaminant sources that are fundamentally different in terms of both their stratigraphic location and release mechanism. The goal of this characterization is to collect data of sufficient quantity and quality to establish current site conditions and to use the data to identify and evaluate if further action is required to protect human health and the environment and achieve permanent closure of the site. The results of these activities will be presented in a subsequent corrective action decision document.

DOE /NV

2001-02-13T23:59:59.000Z

149

Site Visit Report - Independent Oversight Review of Work Planning/Execution and the Employee Concerns Program at Paducah, March 20105-10.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Site Visit Report - Review of Work Planning/Execution and the Employee Concerns Program at Paducah - March 2010 This report documents the results of a review activity performed by the Office of Health, Safety and Security (HSS) in support of the Department of Energy Office of Environmental Management (EM). The purpose of the review was to support EM management efforts to resolve issues and enhance planned corrective actions for worker safety concerns expressed by several safety professionals at the Paducah Plant. The review was conducted by the Office of Health Safety and Security with an EM observer during the week of February 8, 2010. Observations and recommendations resulting from this review were discussed with representatives of EM's Environmental Management Safety

150

Phase 1 RCRA Facility Investigation and Corrective Measures Study Work Plan for Single Shell Tank Waste Management Areas  

SciTech Connect

This document is the master work plan for the Resource Conservation and Recovery Act of 1976 (RCRA) for single-shell tank (SST) farms at the Hanford Site. Evidence indicates that releases at four of the seven SST waste management areas have impacted.

ROGERS, P.M.

2000-06-01T23:59:59.000Z

151

Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Methane Hydrate Multi-Year R&D Program Plan NATIONAL METHANE HYDRATE MULTI-YEAR R&D PROGRAM PLAN U.S. Department of Energy Office of Fossil Energy Federal Energy Technology Center...

152

Applying observations of work activity in designing prototype data analysis tools  

Science Conference Proceedings (OSTI)

Designers, implementers, and marketers of data analysis tools typically have different perspectives than users. Consequently, data analysis often find themselves using tools focused on graphics and programming concepts rather than concepts which reflect their own domain and the context of their work. Some user studies focus on usability tests late in development; others observe work activity, but fail to show how to apply that knowledge in design. This paper describes a methodology for applying observations of data analysis work activity in prototype tool design. The approach can be used both in designing improved data analysis tools, and customizing visualization environments to specific applications. We present an example of user-centered design for a prototype tool to cull large data sets. We revisit the typical graphical approach of animating a large data set from the point of view of an analysis who is culling data. Field evaluations using the prototype tool not only revealed valuable usability information, but initiated in-depth discussions about user`s work, tools, technology, and requirements.

Springmeyer, R.R.

1993-07-06T23:59:59.000Z

153

Site observational work plan for the UMTRA Project site at Ambrosia Lake, New Mexico  

SciTech Connect

The Ambrosia Lake Uranium Mill Tailings Remedial Action (UMTRA) Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. The potential for impacts to human health and the environment from contaminated ground water currently does not exist. No domestic or livestock wells accessing ground water from the uppermost aquifer have been identified within a 5 mile radius from the site. Therefore, no current exposure pathways to humans, livestock, or wildlife exist, nor are any foreseen. The proposed ground water compliance strategy under consideration for application at the Ambrosia Lake site is to perform no remediation, based on the application of supplemental standards because the ground water has ``limited use.``

Not Available

1994-09-01T23:59:59.000Z

154

Work plan for the remedial investigation/feasibility study-environmental assessment for the Colonie site, Colonie, New York  

SciTech Connect

This work plan has been prepared to document the scoping and planning process performed by the US Department of Energy (DOE) to support remedial action activities at the Colonie site. The site is located in eastern New York State in the town of Colonie near the city of Albany. Remedial action of the Colonie site is being planned as part of DOE's Formerly Utilized Sites Remedial Action Program. The DOE is responsible for controlling the release of all radioactive and chemical contaminants from the site. Under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), a remedial investigation/feasibility study (RI/FS) must be prepared to support the decision-making process for evaluating remedial action alternatives. This work plan contains a summary of information known about the site as of January 1988, presents a conceptual site model that identifies potential routes of human exposure to site containments, identifies data gaps, and summarizes the process and proposed studies that will be used to fill the data gaps. In addition, DOE activities must be conducted in compliance with the National Environmental Policy Act (NEPA), which requires consideration of the environmental consequences of a proposed action as part of its decision-making process. This work also describes the approach that will be used to evaluate potential remedial action alternatives and includes a description of the organization, project controls, and task schedules that will be employed to fulfill the requirements of both CERCLA and NEPA. 48 refs., 18 figs., 25 tabs.

Not Available

1990-06-01T23:59:59.000Z

155

Site Characterization Work Plan for Gasbuggy, New Mexico (Rev.1, Jan. 2002)  

Science Conference Proceedings (OSTI)

Project Gasbuggy was the first of three joint government-industry experiments conducted to test the effectiveness of nuclear explosives to fracture deeply buried, low-permeability natural gas reservoirs to stimulate production. The scope of this work plan is to document the environmental objectives and the proposed technical site investigation strategies that will be utilized for the site characterization of the Project Gasbuggy Site. Its goal is the collection of data in sufficient quantity and quality to determine current site conditions, support a risk assessment for the site surfaces, and evaluate if further remedial action is required to achieve permanent closure of the site that is both protective of human health and the environment. The Gasbuggy Site is located approximately 55 air miles east of Farmington, New Mexico, in Rio Arriba County within the Carson National Forest in the northeast portion of the San Juan Basin. Historically, Project Gasbuggy consisted of the joint government-industry detonation of a nuclear device on December 10, 1967, followed by reentry drilling and gas production testing and project evaluation activities in post-detonation operations from 1967 to 1976. Based on historical documentation, no chemical release sites other than the mud pits were identified; additionally, there was no material buried at the Gasbuggy Site other than drilling fluids and construction debris. Although previous characterization and restoration activities including sensitive species surveys, cultural resources surveys, surface geophysical surveys, and limited soil sampling and analysis were performed in 1978 and again in 2000, no formal closure of the site was achieved. Also, these efforts did not adequately address the site's potential for chemical contamination at the surface/shallow subsurface ground levels or the subsurface hazards for potential migration outside of the current site subsurface intrusion restrictions. Additional investigation activities will focus on the surface/shallow subsurface sampling and deep subsurface modeling. Suspected potential contaminants of concern for investigative analysis at the Gasbuggy Site include total petroleum hydrocarbons (diesel- and gasoline-range), volatile organic compounds, semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and radionuclides. The results of this characterization and risk assessment will be used to evaluate corrective action alternatives to include no further action, the implementation of institutional controls, capping on site, or off-site disposal of contaminated waste which will be presented in a subsequent corrective action decision document.

U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office (NNSA/NV)

2002-01-25T23:59:59.000Z

156

Integrated Program of Experimental Diagnostics at the NNSS: An Integrated, Prioritized Work Plan for Diagnostic Development and Maintenance and Supporting Capability  

SciTech Connect

This Integrated Program of Experimental Diagnostics at the NNSS is an integrated prioritized work plan for the Nevada National Security Site (NNSS), formerly the Nevada Test Site (NTS), program that is independent of individual National Security Enterprise Laboratories (Labs) requests or specific Subprograms being supported. This prioritized work plan is influenced by national priorities presented in the Predictive Capability Framework (PCF) and other strategy documents (Primary and Secondary Assessment Technologies Plans and the Plutonium Experiments Plan). This document satisfies completion criteria for FY 2010 MRT milestone #3496: Document an integrated, prioritized work plan for diagnostic development, maintenance, and supporting capability. This document is an update of the 3?year NNSS plan written a year ago, September 21, 2009, to define and understand Lab requests for diagnostic implementation. This plan is consistent with Lab interpretations of the PCF, Primary Assessment Technologies, and Plutonium Experiment plans.

NSTec Mission and Projects Division

2010-09-30T23:59:59.000Z

157

Old hydrofracture facility tanks contents removal action operations plan at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2: Checklists and work instructions  

SciTech Connect

This is volume two of the ORNL old hydrofracture facility tanks contents removal action operations plan. This volume contains checklists and work instructions.

1998-05-01T23:59:59.000Z

158

work  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

THE THE U.S. DEPARTMENT OF ENERGY'S WORKING CAPITAL FUND U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES OCTOBER 1998 AUDIT REPORT CR-B-99-01 MEMORANDUM FOR THE DIRECTOR, BUSINESS MANAGEMENT STAFF FROM: William S. Maharay Acting Manager, Capital Regional Audit Office, Office of Inspector General SUBJECT: INFORMATION : Audit Report on the Department's Working Capital Fund BACKGROUND The Department established the Working Capital Fund (Fund) in January 1996 as a financial management tool for charging the costs of common services provided at Headquarters to Departmental program offices. The objectives in establishing the Fund were to increase efficiency of the Department's operations, improve management of administrative services

159

2012 Bioenergy Action Plan Prepared by the Bioenergy Interagency Working Group  

E-Print Network (OSTI)

's diverse biomass resources for conversion to "low-carbon" biofuels, biogas, and renewable electricity; 2, biomass, biogas, biomethane, biorefinery, biogenic, Bioenergy Action Plan, renewable; biomass residues and biogas. Current bioenergy production in California includes: 33 biomass plants that generate a combined

160

Sandia Site Office Assessment of Activity-Levell Work Planning and Control at Sandia National Laboratories/New Mexico  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SNL-2011-02-18 SNL-2011-02-18 Site: Sandia National Laboratories (SNL) Subject: Office of Independent Oversight's Office of Environment, Safety and Health Evaluations Independent Activity Report for the Sandia Site Office Assessment of Activity-Level Work Planning and Control at Sandia National Laboratories /New Mexico (SNL) Dates of Activity : 02/14/2011 - 02/18/2011 Report Preparer: Patricia Williams Activity Description/Purpose: At the request of the Sandia Site Office (SSO), the Office of Environment, Safety and Health Evaluations (HS-64) personnel participated in an SSO assessment of SNL's Activity-Level Work Planning and Control processes, procedures, and implementation by line organizations, including feedback and improvement activities and efforts to sustain the

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Environmental guidelines for Development of Cultural Resource Management plans. Working draft for comment  

Science Conference Proceedings (OSTI)

DOE has stewardship responsibilities for managing the cultural resources remaining on DOE-owned and other lands impacted by DOE programs. Goal of the DOE-wide Cultural Resource Management (CRM) program is to identify and consolidate compliance actions associated with statutory and regulatory requirements. This document is to provide guidelines to DOE field managers; its implementation is intended to assure that each DOE facility and program complies with executive orders, statutes, and regulations governing the management of cultural resources. It covers CRM goals, existing conditions, CRM methods, CRM procedures and administration, and plan attachments. Glossary, legislation, and documents are covered in appendices.

Not Available

1994-04-01T23:59:59.000Z

162

Work Plan for Developing Double Shell Tank (DST) SubSys Specifications (TBR-120.015)  

Science Conference Proceedings (OSTI)

The DST System stores waste from the processing of nuclear material at the Hanford Nuclear Reservation. The program to dispose of this waste has been divided into several phases with Phase 1 being the demonstration of the waste disposal technology by a private contractor. Subsystem specifications are being prepared providing requirements for the subsystem that are necessary for the continued safe storage of waste in the DST System and the removal of selected waste for processing by the privatized facility during Phase 1. This document provides the detailed plans for developing subsystem specification not developed during FY99.

LEONARD, M.W.

1999-11-19T23:59:59.000Z

163

Work plan for phase 1A paleochannel studies at the Cheney disposal cell, Grand Junction, Colorado: Draft  

Science Conference Proceedings (OSTI)

This document will serve as a Work Plan for continuing paleochannel characterization activities at the Cheney disposal site near Grand Junction, Colorado. Elevated levels of nitrate were encountered in ground water from two monitor wells installed in alluvial paleochannels near the Cheney disposal cell in 1994. This triggered a series of investigations (Phase 1) designed to determine the source of nitrate and other chemical constituents in ground water at the site. A comprehensive summary of the Phase 1 field investigations (limited to passive monitoring and modeling studies) conducted by the Remedial Action Contractor (RAC) and Technical Assistance Contractor (TAC) to date is provided in Section 2.0 of this document. Results of Phase 1 were inconclusive regarding the potential interaction between the disposal cell and the paleochannels, so additional Phase 1A investigations are planned. Recommendations for Phase 1A tasks and possible future activities are discussed in Section 3.0. Detailed information on the implementation of the proposed Phase 1A tasks appears in Section 4.0 and will provide the basis for Statements of Work (SOW) for each of these tasks. A detailed sampling plan is provided to ensure quality and a consistency with previous data collection efforts.

NONE

1996-11-01T23:59:59.000Z

164

Technical Basis for Work Place Air Monitoring for the Plutonium Finishing Plan (PFP)  

SciTech Connect

This document establishes the basis for the Plutonium Finishing Plant's (PFP) work place air monitoring program in accordance with the following requirements: Title 10, Code of Federal Regulations (CFR), Part 835 ''Occupational Radiation Protection''; Hanford Site Radiological Control Manual (HSRCM-1); HNF-PRO-33 1, Work Place Air Monitoring; WHC-SD-CP-SAR-021, Plutonium Finishing Plant Final Safety Analysis Report; and Applicable recognized national standards invoked by DOE Orders and Policies.

JONES, R.A.

1999-10-06T23:59:59.000Z

165

Huge natural gas reserves central to capacity work, construction plans in Iran  

SciTech Connect

Questions about oil production capacity in Iran tend to mask the country's huge potential as a producer of natural gas. Iran is second only to Russia in gas reserves, which National Iranian Gas Co. estimates at 20.7 trillion cu m. Among hurdles to Iran's making greater use of its rich endowment of natural gas are where and how to sell gas not used inside the country. The marketing logistics problem is common to other Middle East holders of gas reserves and a reason behind the recent proliferation of proposals for pipeline and liquefied natural gas schemes targeting Europe and India. But Iran's challenges are greater than most in the region. Political uncertainties and Islamic rules complicate long-term financing of transportation projects and raise questions about security of supply. As a result, Iran has remained mostly in the background of discussions about international trade of Middle Eastern gas. The country's huge gas reserves, strategic location, and existing transport infrastructure nevertheless give it the potential to be a major gas trader if the other issues can be resolved. The paper discusses oil capacity plans, gas development, gas injection for enhanced oil recovery, proposals for exports of gas, and gas pipeline plans.

Not Available

1994-07-11T23:59:59.000Z

166

Work plan for upgrade of SY-101 Hydrogen Mitigation Test Project Data Acquisition and Control System (DACS-1)  

DOE Green Energy (OSTI)

The purpose of this effort is to upgrade the existing DACS-1 used for control and data acquisition in support of the hydrogen mitigation program for tank 101-SY. The planned upgrades will enhance the system capabilities to support additional mitigation projects and improve the system operability by implementing changes identified during operation of the system to date. Once the upgrades have been implemented, the DACS-1 system should operate as it did prior to the upgrade, but with greatly increased speed and capability. No retraining of Test Engineers will be required; the upgrade is designed to be transparent to those who operate it, with only a noticeable increase in the speed of the system. This work plan defines the tasks required for implementing the upgrade. It identifies deliverables, responsible organizations and individuals, interfaces, and schedule. This upgrade effort employs system engineering principles wherever applicable.

Truitt, R.W.

1994-08-01T23:59:59.000Z

167

Work plan for transition of SY-101 hydrogen mitigation test project data acquisition and control system (DACS-1)  

DOE Green Energy (OSTI)

The purpose of this effort is to transfer operating and maintenance responsibility for the 241-SY-101 data acquisition and control system (DACS-1) from Los Alamos National Laboratory to Westinghouse Hanford Company. This work plan defines the tasks required for a successful turnover. It identifies DACS-1 transition, deliverables, responsible organizations and individuals, interfaces, cost, and schedule. The transition plan will discuss all required hardware, software, documentation, maintenance, operations, and training for use at Hanford Waste Tank 241-SY-101. The transfer of responsibilities for DACS-1 to WHC is contingent on final approval of applicable Acceptance for Beneficial Use documentation by Waste Tank Operations. The DACS-1 was designed to provide data monitoring, display, and storage for Tank 241-SY-101. The DACS-1 also provides alarm and control of all the hydrogen mitigation testing systems, as well as ancillary systems and equipment (HVAC, UPS, etc.) required to achieve safe and reliable operation of the testing systems in the tank.

McClees, J.; Truitt, R.W.

1994-10-12T23:59:59.000Z

168

Waste management project fiscal year 1998 multi-year work plan WBS 1.2  

SciTech Connect

The MYWP technical baseline describes the work to be accomplished by the Project and the technical standards which govern that work. The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposition of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project (SW), Liquid Effluents Project (LEP), and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible. The paper tabulates the major facilities that interface with this Project, identifying the major facilities that generate waste, materials, or infrastructure for this Project and the major facilities that will receive waste and materials from this Project.

Slaybaugh, R.R.

1997-08-29T23:59:59.000Z

169

New Pump and Treat Facility Remedial Action Work Plan for Test Area North (TAN) Final Groundwater Remediation, Operable Unit 1-07B  

SciTech Connect

This operations and maintenance plan supports the New Pump and Treat Facility (NPTF) remedial action work plan and identifies the approach and requirements for the operations and maintenance activities specific to the final medical zone treatment remedy. The NPTF provides the treatment system necessary to remediate the medical zone portion of the OU 1-07B contaminated groundwater plume. Design and construction of the New Pump and Treat Facility is addressed in the NPTF remedial action work plan. The scope of this operation and maintenance plan includes facility operations and maintenance, remedy five-year reviews, and the final operations and maintenance report for the NPTF.

L. O. Nelson

2003-09-01T23:59:59.000Z

170

Remedial Investigation/Feasibility Study Work Plan for the 200-UP-1 Groundwater Operable Unit, Hanford Site, Richland, Washington. Revision  

Science Conference Proceedings (OSTI)

This work plan identifies the objectives, tasks, and schedule for conducting a Remedial Investigation/Feasibility Study for the 200-UP-1 Groundwater Operable Unit in the southern portion of the 200 West Groundwater Aggregate Area of the Hanford Site. The 200-UP-1 Groundwater Operable Unit addresses contamination identified in the aquifer soils and groundwater within its boundary, as determined in the 200 West Groundwater Aggregate Area Management Study Report (AAMSR) (DOE/RL 1992b). The objectives of this work plan are to develop a program to investigate groundwater contaminants in the southern portion of the 200 West Groundwater Aggregate Area that were designated for Limited Field Investigations (LFIs) and to implement Interim Remedial Measures (IRMs) recommended in the 200 West Groundwater AAMSR. The purpose of an LFI is to evaluate high priority groundwater contaminants where existing data are insufficient to determine whether an IRM is warranted and collect sufficient data to justify and implement an IRM, if needed. A Qualitative Risk Assessment (QRA) will be performed as part of the LFI. The purpose of an IRM is to develop and implement activities, such as contaminant source removal and groundwater treatment, that will ameliorate some of the more severe potential risks of groundwater contaminants prior to the RI and baseline Risk Assessment (RA) to be conducted under the Final Remedy Selection (FRS) at a later date. This work plan addresses needs of a Treatability Study to support the design and implementation of an interim remedial action for the Uranium-{sup 99}{Tc}-Nitrate multi-contaminant IRM plume identified beneath U Plant.

Not Available

1994-01-01T23:59:59.000Z

171

Page 1 of 12 Local Work Planning and Control Procedure 10/31/2012  

E-Print Network (OSTI)

adequately briefed and responsibilities across organizations are understood. 3 Worker Following the pre-job is to be conducted; 2 Group Leader/Supervisor If more than one worker is involved conduct a pre-job meeting the "Work Authorization Checklist". 6 Group Leader/Supervisor Resolve all comments resulting from the ES

Kemner, Ken

172

Terms of Reference Stakeholder Engagement Plan SE-24 Report Site Transition Working Group  

E-Print Network (OSTI)

This Terms of Reference was prepared to ensure a mutual understanding of objectives and process. This working group has been established to provide stakeholders the opportunity for input and feedback to the IESO on the impact on their business to accommodate a change in the report format, move to a single location for report retrieval and the restructuring of the reports to improve report

unknown authors

2006-01-01T23:59:59.000Z

173

Higgs Working Group Report of the Snowmass 2013 Community Planning Study  

E-Print Network (OSTI)

This report summarizes the work of the Energy Frontier Higgs Boson working group of the 2013 Community Summer Study (Snowmass). We identify the key elements of a precision Higgs physics program and document the physics potential of future experimental facilities as elucidated during the Snowmass study. We study Higgs couplings to gauge boson and fermion pairs, double Higgs production for the Higgs self-coupling, its quantum numbers and $CP$-mixing in Higgs couplings, the Higgs mass and total width, and prospects for direct searches for additional Higgs bosons in extensions of the Standard Model. Our report includes projections of measurement capabilities from detailed studies of the Compact Linear Collider (CLIC), a Gamma-Gamma Collider, the International Linear Collider (ILC), the Large Hadron Collider High-Luminosity Upgrade (HL-LHC), Very Large Hadron Colliders up to 100 TeV (VLHC), a Muon Collider, and a Triple-Large Electron Positron Collider (TLEP).

S. Dawson; A. Gritsan; H. Logan; J. Qian; C. Tully; R. Van Kooten; A. Ajaib; A. Anastassov; I. Anderson; D. Asner; O. Bake; V. Barger; T. Barklow; B. Batell; M. Battaglia; S. Berge; A. Blondel; S. Bolognesi; J. Brau; E. Brownson; M. Cahill-Rowley; C. Calancha-Paredes; C. -Y. Chen; W. Chou; R. Clare; D. Cline; N. Craig; K. Cranmer; M. de Gruttola; A. Elagin; R. Essig; L. Everett; E. Feng; K. Fujii; J. Gainer; Y. Gao; I. Gogoladze; S. Gori; R. Goncalo; N. Graf; C. Grojean; S. Guindon; H. Haber; T. Han; G. Hanson; R. Harnik; S. Heinemeyer; U. Heintz; J. Hewett; Y. Ilchenko; A. Ishikawa; A. Ismail; V. Jain; P. Janot; S. Kanemura; S. Kawada; R. Kehoe; M. Klute; A. Kotwal; K. Krueger; G. Kukartsev; K. Kumar; J. Kunkle; M. Kurata; I. Lewis; Y. Li; L. Linssen; E. Lipeles; R. Lipton; T. Liss; J. List; T. Liu; Z. Liu; I. Low; T. Ma; P. Mackenzie; B. Mellado; K. Melnikov; A. Miyamoto; G. Moortgat-Pick; G. Mourou; M. Narain; H. Neal; J. Nielsen; N. Okada; H. Okawa; J. Olsen; H. Ono; P. Onyisi; N. Parashar; M. Peskin; F. Petriello; T. Plehn; C. Pollard; C. Potter; K. Prokofiev; M. Rauch; T. Rizzo; T. Robens; V. Rodriguez; P. Roloff; R. Ruiz; V. Sanz; J. Sayre; Q. Shafi; G. Shaughnessy; M. Sher; F. Simon; N. Solyak; J. Strube; J. Stupak; S. Su; T. Suehara; T. Tanabe; T. Tajima; V. Telnov; J. Tian; S. Thomas; M. Thomson; K. Tsumura; C. Un; M. Velasco; C. Wagner; S. Wang; S. Watanuki; G. Weiglein; A. Whitbeck; K. Yagyu; W. Yao; H. Yokoya; S. Zenz; D. Zerwas; Y. Zhang; Y. Zhou

2013-10-31T23:59:59.000Z

174

New Pump and Treat Facility Remedial Action Work Plan For Test Area North Final Groundwater Remediation, Operable Unit 1-07B  

Science Conference Proceedings (OSTI)

This remedial action work plan identifies the approach and requirements for implementing the medial zone remedial action for Test Area North, Operable Unit 1-07B, at the Idaho National Laboratory. This plan details the management approach for the construction and operation of the New Pump and Treat Facility (NPTF). As identified in the remediatial design/remedial action scope of work, a separate remedial design/remedial action work plan will be prepared for each remedial component of the Operable Unit 1-07B remedial action.

Nelson, L. O.

2007-06-12T23:59:59.000Z

175

Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2  

SciTech Connect

The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.

Jacobsen, P.H.

1997-09-23T23:59:59.000Z

176

Pepco Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 25, 2007 May 25, 2007 Kevin Kolevar Director of the Office of Electricity Deliverability and Energy Reliability Department of Energy 1000 Independence Ave., SW Washington, DC 20585 Dear Mr. Kolevar, DOE has requested that Pepco provide an update on the current work to install two new 230 kilovolt circuits into Potomac River substation and to evaluate the need for generation from the Potomac River plant to support the anticipated line outage during June, 2007. An outage on one of the 230 kV circuits is currently underway and is currently scheduled to be completed by June 2, 2007. Mirant has supported this outage with generation required to match the Potomac River area load from the substation. This has required the operation of all 5 generating units located at

177

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase IV  

Science Conference Proceedings (OSTI)

This Phase IV Remedial Design/Remedial Action Work Plan addresses the remediation of areas with the potential for UXO at the Idaho National Laboratory. These areas include portions of the Naval Proving Ground, the Arco High-Altitude Bombing Range, and the Twin Buttes Bombing Range. Five areas within the Naval Proving Ground that are known to contain UXO include the Naval Ordnance Disposal Area, the Mass Detonation Area, the Experimental Field Station, The Rail Car Explosion Area, and the Land Mine Fuze Burn Area. The Phase IV remedial action will be concentrated in these five areas. For other areas, such as the Arco High-Altitude Bombing Range and the Twin Buttes Bombing Range, ordnance has largely consisted of sand-filled practice bombs that do not pose an explosion risk. Ordnance encountered in these areas will be addressed under the Phase I Operations and Maintenance Plan that allows for the recovery and disposal of ordnance that poses an imminent risk to human health or the environment.

R. P. Wells

2006-11-14T23:59:59.000Z

178

Remedial Design/Remedial Action Work Plan for Operable Units 6-05 and 10-04, Phase III  

SciTech Connect

The remedial design/remedial action for Operable Unit 6-05 (Waste Area Group 6) and Operable Unit 10-04 (Waste Area Group 10) - collectively called Operable Unit 10-04 has been divided into four phases. Phase I consists of developing and implementing institutional controls at Operable Unit 10-04 sites and developing and implementing Idaho National Laboratory-wide plans for both institutional controls and ecological monitoring. Phase II will remediate sites contaminated with trinitrotoluene and Royal Demolition Explosive. Phase III will remediate lead contamination at a gun range, and Phase IV will remediate hazards from unexploded ordnance. This Phase III remedial Design/Remedial Action Work Plan addresses the remediation of lead-contaminated soils found at the Security Training Facility (STF)-02 Gun Range located at the Idaho National Laboratory. Remediation of the STF-02 Gun Range will include excavating contaminated soils; physically separating copper and lead for recycling; returning separated soils below the remediation goal to the site; stabilizing contaminated soils, as required, and disposing of the separated soils that exceed the remediation goal; encapsulating and disposing of creosote-contaminated railroad ties and power poles; removing and disposing of the wooden building and asphalt pads found at the STF-02 Gun Range; sampling and analyzing soil to determine the excavation requirements; and when the remediation goals have been met, backfilling and contouring excavated areas and revegetating the affected area.

R. P. Wells

2006-09-19T23:59:59.000Z

179

Work Plan for the Feasibility Study for Remedial Action at J-Field, Aberdeen Proving Ground, Maryland  

Science Conference Proceedings (OSTI)

The purpose of the feasibility study is to gather sufficient information to develop and evaluate alternative remedial actions to address contamination at J-Field in compliance with the NCP, CERCLA, and SARA. This FS Work Plan summarizes existing environmental data for each AOC and outlines the tasks to be performed to evaluate and select remedial technologies. The tasks to be performed will include (1) developing remedial action objectives and identifying response actions to meet these objectives; (2) identifying and screening remedial action technologies on the basis of effectiveness, implementability, and cost; (3) assembling technologies into comprehensive alternatives for J-Field; (4) evaluating, in detail, each alternative against the nine EPA evaluation criteria and comparing the alternatives to identify their respective strengths and weaknesses; and (5) selecting the preferred alternative for each operable unit.

Benioff, P.; Biang, C.; Haffenden, R.; Goyette, M.; Martino, L.; Patton, T.; Yuen, C.

1995-05-01T23:59:59.000Z

180

Spent nuclear fuel project multi-year work plan WBS {number_sign}1.4.1  

Science Conference Proceedings (OSTI)

The Spent Nuclear Fuel (SNF) Project Multi-Year Work Plan (MYWP) is a controlled living document that contains the current SNF Project Technical, Schedule and Cost Baselines. These baselines reflect the current Project execution strategies and are controlled via the change control process. Other changes to the MYWP document will be controlled using the document control process. These changes will be processed as they are approved to keep the MYWP a living document. The MYWP will be maintained continuously as the project baseline through the life of the project and not revised annually. The MYWP is the one document which summarizes and links these three baselines in one place. Supporting documentation for each baseline referred to herein may be impacted by changes to the MYWP, and must also be revised through change control to maintain consistency.

Wells, J.L.

1997-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

FY 1991 environmental research programs for the Nevada Operations Office: Work plan and quarterly reports, first and second quarter reports  

SciTech Connect

The work carried out on behalf of the DOE by the Desert Research Institute (DRI) includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies, site mitigation plans, compliance activities, and historical research; offsite community radiation monitoring support; environmental compliance activities related to stat and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design, laboratory, field, and administrative activities. In addition to these, archaeological site characterization, flood hazards for rail transportation, and paleofaunal investigations will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, review and classification of DRI documents, and preparation of any special reports, e.g., quarterly reports, not included in the requirements of the individual projects. A new set of programs funded by the Office of Technology Development will be in place by the third quarter of FY 1991. These projects will address environmental restoration and waste management concerns, among other related topics. This document contains the Work Plan, including project descriptions, tasks, deliverables and quarterly progress reports on each project for FY 1991.

NONE

1991-05-01T23:59:59.000Z

182

Remedial investigation/feasibility study Work Plan and addenda for Operable Unit 4-12: Central Facilities Area Landfills II and III at the Idaho National Engineering Laboratory  

SciTech Connect

This document is divided into two main sections -- the Work Plan and the addenda. The Work Plan describes the regulatory history and physical setting of Operable Unit 4-12, previous sampling activities, and data. It also identifies a preliminary conceptual model, preliminary remedial action alternatives, and preliminary applicable or relevant and appropriate requirements. In addition, the Work Plan discusses data gaps and data quality objectives for proposed remedial investigation activities. Also included are tasks identified for the remedial investigation/feasibility study (RI/FS) and a schedule of RI/FS activities. The addenda include details of the proposed field activities (Field Sampling Plan), anticipated quality assurance activities (Quality Assurance Project Plan), policies and procedures to protect RI/FS workers and the environment during field investigations (Health and Safety Plan), and policies, procedures, and activities that the Department of Energy will use to involve the public in the decision-making process concerning CFA Landfills II and III RI/FS activities (Community Relations Plan).

Keck, K.N.; Stormberg, G.J.; Porro, I.; Sondrup, A.J.; McCormick, S.H.

1993-07-01T23:59:59.000Z

183

Industrial Sites Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (including Record of Technical Change Nos. 1, 2, 3, and 4)  

SciTech Connect

This Leachfield Corrective Action Units (CAUs) Work Plan has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the U.S. Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the U.S. Department of Defense (FFACO, 1996). Under the FFACO, a work plan is an optional planning document that provides information for a CAU or group of CAUs where significant commonality exists. A work plan may be developed that can be referenced by leachfield Corrective Action Investigation Plans (CAIPs) to eliminate redundant CAU documentation. This Work Plan includes FFACO-required management, technical, quality assurance (QA), health and safety, public involvement, field sampling, and waste management documentation common to several CAUs with similar site histories and characteristics, namely the leachfield systems at the Nevada Test Site (NTS) and the Tonopah Test Range (TT R). For each CAU, a CAIP will be prepared to present detailed, site-specific information regarding contaminants of potential concern (COPCs), sampling locations, and investigation methods.

DOE /NV

1998-12-18T23:59:59.000Z

184

Remedial investigation/feasibility study work plan for the 100-BC-2 operable unit, Hanford Site, Richland, Washington  

SciTech Connect

This work plan and attached supporting project plans establish the operable unit setting and the objectives, procedures, tasks, and schedule for conducting the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial investigation/feasibility study (RI/FS) for the 100-BC-2 operable unit in the 100 Area of the Hanford Site. The 100 Area is one of four areas at the Hanford Site that are on the US Environmental Protection Agency`s (EPA) National Priorities List under CERCLA. The 100-BC-2 operable unit is one of two source operable units in the 100-B/C Area (Figure ES-1). Source operable units are those that contain facilities and unplanned release sites that are potential sources of hazardous substance contamination. The 100-BC-2 source operable unit contains waste sites that were formerly in the 100-BC-2, 100-BC-3, and 100-BC-4 operable units. Because of their size and geographic location, the waste sites from these two operable units were added to 100-BC-2. This allows for a more efficient and effective investigation of the remaining 100-B/C Reactor area waste sites. The investigative approach to waste sites associated with the 100-BC-2 operable unit are listed in Table ES-1. The waste sites fall into three general categories: high priority liquid waste disposal sites, low priority liquid waste disposal sites, and solid waste burial grounds. Several sites have been identified as candidates for conducting an IRM. Two sites have been identified as warranting additional limited field sampling. The two sites are the 116-C-2A pluto crib, and the 116-C-2C sand filter.

Not Available

1993-05-01T23:59:59.000Z

185

February 28, 2006, Department letter reporting completion of NNSA portion of Commitment 23 in the 2004-1 implementation plan, Oversight of Complex, High-Hazard Nuclear Operations, which requires the development of site office action plans to improve the consistency and reliability of work planning and work control at the activity level, including the incorporation of Integrated Safety Management core functions  

NLE Websites -- All DOE Office Websites (Extended Search)

Washington, DC 20585 Washington, DC 20585 February 28, 2006 OFFICE O F THE ADMINISTRATOR The Honorable A. J. Eggenberger Ch a i rm an Defensc Nuclear Facilities Safety Board 625 Indiana Avenue, NW., Suite 700 Washington, D.C. 20004-2901 Dear Mr. Chairman: On Julie 10, 2005, Secretary Bodnian submitted the Department's Iiizplenzentution Plun to Itizpt-ove Oversight qf'Nucleur Operutions in response to Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2004- I , Oversight qf Complex, High-Hrrzurd Nucleur Openrtiotzs. Section 5.3 of the Implementation Plan (IP) addresses Revitalizing Integruted SU/i-'ty Munagernent Implementution, and Subsection 5.3.2 addresses Work Plunning mil Work Control ut the Activity Level. Commitment 23 of the 1P requires development of site office action plans to improve the consistency and reliability of work

186

Reference Upper-Air Observations for Climate: Rationale, Progress, and Plans  

Science Conference Proceedings (OSTI)

While the global upper-air observing network has provided useful observations for operational weather forecasting for decades, its measurements lack the accuracy and long-term continuity needed for understanding climate change. Consequently, the ...

Dian J. Seidel; Franz H. Berger; Franz Immler; Michael Sommer; Holger Vmel; Howard J. Diamond; John Dykema; David Goodrich; William Murray; Thomas Peterson; Douglas Sisterson; Peter Thorne; Junhong Wang

2009-03-01T23:59:59.000Z

187

WORK PLAN FOR ENVIRONMENTAL WORK PLAN FOR ENVIRONMENTAL WORK...  

Office of Legacy Management (LM)

scenarios and generally are not allowed on the property for extended periods of time. This statement could be misinterpreted by the public and potential MMCIC tenants. The...

188

Columbia Plateau Basin and Fifteenmile Subbasin Water Rights Acquisitons; Oregon Water Trust Combined Work Plan, 2002-2003 Final Report.  

DOE Green Energy (OSTI)

This is the Final Report submitted regarding Oregon Water Trust's Combined Work Plan for fiscal year 2003, with the contract period April 2002 to May 2003. Of this 12 month period, six month were spent concluding our work for the 2002 irrigation season and six months were spent preparing for the 2003 irrigation season. After this grant was completed, projects were finished with funding from the Columbia Basin Water Transactions Program. Many of the 2003 irrigation season successes began in the fall of 2002, when projects were researched and partnerships were developed. Trout Creek Ranch was one of the large successes. During the 2003 irrigation season, 2.6 cfs was leased which led to a permanent instream transfer, protecting critical spawning habitat for summer steelhead in the Deschutes basin. Another success was the Walla Walla Lease Bank project. This project is an agreement between the OWT, the Walla Walla Irrigation District and 11 individual landowners. Through this single year lease, 7.9 cfs of water was legally protected in the Walla Walla River. The Vidando lease on Middle Fork John Day River was renewed for 2 more years, protecting 11.29 cfs. An innovative single year split-season lease was conducted with Voight on Standard Creek in the John Day basin to protect 4.93 cfs. Many other deals were conducted and the total was an impressive 50.43 cfs instream during 2003 and 9.39 cfs pending approval for the 2004 season. Included is a summary of the activities within the Fifteenmile subbasin and the Columbia Plateau basin by quarter and two tables. The summary of activities is broken down by objectives and quarters. The first summarizes the total cfs by type of lease or transfer. The second table lists all the projects by subbasin and provides project type, lease number, cfs, cost of acquisition, partners in the project and funding source.

Paulus, Fritz

2003-12-01T23:59:59.000Z

189

Comprehensive work plan for Building 3001 storage canal at the Oak Ridge National Laboratory, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

This Comprehensive Work Plan describes the method of accomplishment to replace the shielding protection of the water in the canal with a controlled low strength material (CLSM) 4. The canal was used during the operation of the Oak Ridge Graphite Reactor in the 1940s and 1950s to transport spent fuel slugs and irradiated test materials from the reactor, under water to the hot cell in Building 3019 for further processing, packaging, and handling. After the reactor was shut down, the canal was used until 1990 to store some irradiated materials until they could be transferred to a Solid Waste Storage Area. This task has the following objectives and components: (1) minimize potential future risk to human health and the environment; (2) reduce surveillance and maintenance cost of the canal; (3) perform site preparation activities; (4) replace the water in the canal with a solid CLSM; (5) pump the water to the Process Waste Treatment System (PWTS) for further processing at the same rate that the CLSM is pumped under the water; (6) remove the water using a process that will protect the workers and the public in the visitors area from contamination while the CLSM is being pumped underneath the water; (7) painting a protective coating material over the CLSM after the CLSM has cured.

NONE

1997-01-01T23:59:59.000Z

190

FY 1990 environmental research programs for the Nevada Operations Office. Work plan and quarterly reports, first through fourth quarter reports  

Science Conference Proceedings (OSTI)

This work includes a wide range of research and support activities associated with the Weapons Testing Program conducted at the Nevada Test Site (NTS). Ongoing and new environmental research programs to be conducted by DRI over the period of this contract include archaeological studies and site mitigation plans; offsite community radiation monitoring support; environmental compliance activities related to state and federal regulations; hydrologic assessment of containment of underground nuclear detonations; hydrology/radionuclide investigations designed to better understand and predict the possible subsurface movement of radionuclides at the NTS; and support of various statistical and data management and design activities. In addition to these, archaeological and other activities will be carried out in support of the Yucca Mountain Project. Other areas of the overall program which require DRI support are classified security activities, radiation safety and training, quality assurance and control, computer protection and historical data management, derivative classification of DRI documents, and preparation of any special reports not included in the requirements of the individual projects.

NONE

1990-11-01T23:59:59.000Z

191

FY 1995 remedial investigation work plan for Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

Field activities to support the remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) include characterization of the nature and extent of contamination in WAG 2, specifically to support risk-based remediation decisions. WAG 2 is the major drainage system downgradient of other WAGs containing significant sources of contamination at ORNL. The RI of WAG 2 is developed in three phases: Phase 1, initial scoping characterization to determine the need for early action; Phase 2, interim activities during remediation of upgradient WAGs to evaluate potential changes in the contamination status of WAG 2 that would necessitate reevaluation of the need for early action; and Phase 3, completion of the RI process following remediation of upslope WAGs. Specifically, Phase 2 activities are required to track key areas to determine if changes have occurred in WAG 2 that would require (1) interim remedial action to protect human health and the environment or (2) changes in remedial action plans and schedules for WAG2 because of changing contaminant release patterns in upslope WAGs or because of the effects of interim remedial or removal actions in other WAGs. This report defines activities to be conducted in FY 1995 for completion of the Phase 1 RI and initiation of limited Phase 2 field work.

Watkins, D.R.; Herbes, S.E. [eds.

1994-09-01T23:59:59.000Z

192

Final work plan : Phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Savannah, Missouri.  

SciTech Connect

From approximately 1949 until 1970, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility on federally owned property approximately 0.25 mi northwest of Savannah, Missouri. During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities. In November 1998, carbon tetrachloride was detected in a private well (Morgan) roughly 50 ft south of the former CCC/USDA facility, as a result of state-wide screening of private wells near former CCC/USDA facilities, conducted in Missouri by the U.S. Environmental Protection Agency (EPA 1999). The 1998 and subsequent investigations by the EPA and the Missouri Department of Natural Resources (MoDNR) confirmed the presence of carbon tetrachloride in the Morgan well, as well as in a second well (on property currently occupied by the Missouri Department of Transportation [MoDOT]), approximately 400 ft east of the former CCC/USDA facility. Carbon tetrachloride concentrations in the Morgan well have ranged from the initial value of 29 {micro}g/L in 1998, up to a maximum of 61 {micro}g/L in 1999, and back down to 22 {micro}g/L in 2005. The carbon tetrachloride concentration in the MoDOT well in 2000 (the only time it was sampled) was 321 {micro}g/L. The concentrations for the two wells are above the EPA maximum contaminant level (MCL) of 5 {micro}g/L for carbon tetrachloride (EPA 1999; MoDNR 2000a,b). Because the observed contamination in the Morgan and MoDOT wells might be linked to the past use of carbon tetrachloride-based grain fumigants at its former grain storage facility, the CCC/USDA will conduct investigations to (1) characterize the source(s), extent, and factors controlling the subsurface distribution and movement of carbon tetrachloride at Savannah and (2) evaluate the health and environmental threats potentially posed by the contamination. This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigative activities at Savannah will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with the DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Savannah will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Savannah investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Savannah site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne will issue a Provisional Master Work Plan (PMWP; Argonne 2007) that will be submitted to the MoDNR for review and approval. The agency has already reviewed and approved (with minor changes) the present Master Work Plan (Argonne 2002) under which Argonne currently operates in Kansas. The PMWP (Argonne 2007) will provide detailed information and guidance on the investigative technologies, analytical methodologies, quality assurance-quality control measures, and general health and safety policies to be employed by Argonne for all investigations at former CCC/USDA grain storage facilities in Missouri. Both the PMWP

LaFreniere, L. M.; Environmental Science Division

2007-10-12T23:59:59.000Z

193

Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

Not Available

1993-08-01T23:59:59.000Z

194

WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the soil and sediment task. Environmental Restoration Program  

SciTech Connect

This document is a site-specific work plan/health and safety checklist (WP/HSC) for a task of the Waste Area Grouping 2 Remedial Investigation and Site Investigation (WAG 2 RI&SI). Title 29 CFR Part 1910.120 requires that a health and safety program plan that includes site- and task-specific information be completed to ensure conformance with health- and safety-related requirements. To meet this requirement, the health and safety program plan for each WAG 2 RI&SI field task must include (1) the general health and safety program plan for all WAG 2 RI&SI field activities and (2) a WP/HSC for that particular field task. These two components, along with all applicable referenced procedures, must be kept together at the work site and distributed to field personnel as required. The general health and safety program plan is the Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169). The WP/HSCs are being issued as supplements to ORNL/ER-169.

Holt, V.L.; Burgoa, B.B.

1993-12-01T23:59:59.000Z

195

Final work plan : phase I investigation of potential contamination at the former CCC/USDA grain storage facility in Montgomery City, Missouri.  

SciTech Connect

From September 1949 until September 1966, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) leased property at the southeastern end of Montgomery City, Missouri, for the operation of a grain storage facility. During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities. In January 2000, carbon tetrachloride was detected in a soil sample (220 {micro}g/kg) and two soil gas samples (58 {micro}g/m{sup 3} and 550 {micro}g/m{sup 3}) collected at the former CCC/USDA facility, as a result of a pre-CERCLIS site screening investigation (SSI) performed by TN & Associates, Inc., on behalf of the U.S. Environmental Protection Agency (EPA), Region VII (MoDNR 2001). In June 2001, the Missouri Department of Natural Resources (MoDNR) conducted further sampling of the soils and groundwater at the former CCC/USDA facility as part of a preliminary assessment/site inspection (PA/SI). The MoDNR confirmed the presence of carbon tetrachloride (at a maximum identified concentration of 2,810 {micro}g/kg) and chloroform (maximum 82 {micro}g/kg) in the soils and also detected carbon tetrachloride and chloroform (42.2 {micro}g/L and 58.4 {micro}g/L, respectively) in a groundwater sample collected at the former facility (MoDNR 2001). The carbon tetrachloride levels identified in the soils and groundwater are above the default target level (DTL) values established by the MoDNR for this contaminant in soils of all types (79.6 {micro}g/kg) and in groundwater (5.0 {micro}g/L), as outlined in Missouri Risk-Based Corrective Action (MRBCA): Departmental Technical Guidance (MoDNR 2006a). The corresponding MRBCA DTL values for chloroform are 76.6 {micro}g/kg in soils of all types and 80 {micro}g/L in groundwater. Because the observed contamination at Montgomery City might be linked to the past use of carbon tetrachloride-based fumigants at its former grain storage facility, the CCC/USDA will conduct investigations to (1) characterize the source(s), extent, and factors controlling the possible subsurface distribution and movement of carbon tetrachloride at the Montgomery City site and (2) evaluate the health and environmental threats potentially represented by the contamination. This work will be performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and the MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The investigations at Montgomery City will be conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. Argonne is a nonprofit, multidisciplinary research center operated by UChicago Argonne, LLC, for the U.S. Department of Energy (DOE). The CCC/USDA has entered into an agreement with DOE, under which Argonne provides technical assistance to the CCC/USDA with environmental site characterization and remediation at its former grain storage facilities. The site characterization at Montgomery City will take place in phases. This approach is recommended by the CCC/USDA and Argonne, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. This site-specific Work Plan outlines the specific technical objectives and scope of work proposed for Phase I of the Montgomery City investigation. This Work Plan also includes the community relations plan to be followed throughout the CCC/USDA program at the Montgomery City site. Argonne is developing a Master Work Plan specific to operations in the state of Missouri. In the meantime, Argonne has issued a Provisional Master Work Plan (PMWP; Argonne 2007) that has been reviewed and approved by the MoDNR for current use. The PMWP (Argonne 2007) provides detailed information and guidance on the investigative technologies, analytical methodologies, qua

LaFreniere, L. M.; Environmental Science Division

2010-08-16T23:59:59.000Z

196

Remedial investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODs) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regimes, which are labeled as integrator OUs. This remedial investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the feasibility study to evaluate all probable or likely alternatives.

Not Available

1993-07-01T23:59:59.000Z

197

Remedial Investigation work plan for Bear Creek Valley Operable Unit 4 (shallow groundwater in Bear Creek Valley) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

Science Conference Proceedings (OSTI)

To effectively evaluate the cumulative impact of releases from multiple sources of contamination, a structured approach has been adopted for Oak Ridge Reservation (ORR) based on studies of the groundwater and surface water separate from studies of the sources. Based on the realization of the complexity of the hydrogeologic regime of the ORR, together with the fact that there are numerous sources contributing to groundwater contamination within a geographical area, it was agreed that more timely investigations, at perhaps less cost, could be achieved by separating the sources of contamination from the groundwater and surface water for investigation and remediation. The result will be more immediate attention [Records of Decision (RODS) for interim measures or removal actions] for the source Operable Units (OUs) while longer-term remediation investigations continue for the hydrogeologic regime`s, which are labeled as integrator OUs. This Remedial Investigation work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to the unit. Taking advantage of the historical data base and ongoing monitoring activities and applying the observational approach to focus data gathering activities will allow the Feasibility Study to evaluate all probable or likely alternatives.

Not Available

1993-09-01T23:59:59.000Z

198

Operable Unit 3-13, Group 3, Other Surface Soils Remediation Sets 4-6 (Phase II) Remedial Design/Remedial Action Work Plan  

SciTech Connect

This Remedial Design/Remedial Action Work Plan provides the framework for defining the remedial design requirements, preparing the design documentation, and defining the remedial actions for Waste Area Group 3, Operable Unit 3-13, Group 3, Other Surface Soils, Remediation Sets 4-6 (Phase II) located at the Idaho Nuclear Technology and Engineering Center at the Idaho National Laboratory. This plan details the design developed to support the remediation and disposal activities selected in the Final Operable Unit 3-13, Record of Decision.

D. E. Shanklin

2006-06-01T23:59:59.000Z

199

Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft  

SciTech Connect

The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section}7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado.

Not Available

1994-09-01T23:59:59.000Z

200

Facility stabilization project fiscal year 1997 multi-year work plan (MYWP) for WBS 7.1  

SciTech Connect

This document contains the technical baseline, work breakdown structure, schedule baseline, cost baseline, and execution year for the facility stabilization project.

Cartmell, D.B.

1996-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

WAG 2 remedial investigation and site investigation site-specific work plan/health and safety checklist for the sediment transport modeling task  

SciTech Connect

This site-specific Work Plan/Health and Safety Checklist (WP/HSC) is a supplement to the general health and safety plan (HASP) for Waste Area Grouping (WAG) 2 remedial investigation and site investigation (WAG 2 RI&SI) activities [Health and Safety Plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee (ORNL/ER-169)] and provides specific details and requirements for the WAG 2 RI&SI Sediment Transport Modeling Task. This WP/HSC identifies specific site operations, site hazards, and any recommendations by Oak Ridge National Laboratory (ORNL) health and safety organizations [i.e., Industrial Hygiene (IH), Health Physics (HP), and/or Industrial Safety] that would contribute to the safe completion of the WAG 2 RI&SI. Together, the general HASP for the WAG 2 RI&SI (ORNL/ER-169) and the completed site-specific WP/HSC meet the health and safety planning requirements specified by 29 CFR 1910.120 and the ORNL Hazardous Waste Operations and Emergency Response (HAZWOPER) Program Manual. In addition to the health and safety information provided in the general HASP for the WAG 2 RI&SI, details concerning the site-specific task are elaborated in this site-specific WP/HSC, and both documents, as well as all pertinent procedures referenced therein, will be reviewed by all field personnel prior to beginning operations.

Holt, V.L.; Baron, L.A.

1994-05-01T23:59:59.000Z

202

Climate VISION: Private Sector Initiatives: Semiconductors: Work...  

Office of Scientific and Technical Information (OSTI)

Work Plans The Semiconductor Industry Association has finalized its work plan with the collaboration of EPA. The plan describes actions the industry intends to take to achieve its...

203

Oak Ridge Y-12 Plant Computer Integrated Manufacturing Strategic Plan (FY 1986-1992): a working document  

SciTech Connect

The Y-12 Computer-Integrated Manufacturing (CIM) Program is managing the migration of the plant's CIM infrastructure from today's environment to an integrated, highly flexible, and more responsive manufacturing architecture planned for the 1990s. The program is committed to: (1) meeting DOE CIM directives, and (2) improving the manufacturing performance of the Y-12 Plant. The CIM Program charter in Y-12 is to improve manufacturing performance through integrated computer and communication technologies such that the plant's ability to meet its current and future manufacturing objectives is significantly enhanced. To achieve this goal, CIM technologies are being applied in two primary areas: (1) automation of manufacturing processes, and (2) automation of information of information systems. The objectives of the CIM Program are as follows: Meet DOE CIM directives; Reduce product cost; Meet production schedules with minimum contingency costs; Improve product quality via quality assurance at the point of origin; Minimize in-process inventory and improve inventory control; Reduce product lead time; Improve production flexibility.

Not Available

1985-09-01T23:59:59.000Z

204

Environmental assessment for transuranic waste work-off plan, Los Alamos National Laboratory. Rough draft: Final report  

Science Conference Proceedings (OSTI)

The Los Alamos National Laboratory (LANL) generates transuranic (TRU) waste in a variety of programs related to national defense. TRU waste is a specific class of radioactive waste requiring permanent isolation. Most defense-related TRU waste will be permanently disposed of in the Waste Isolation Pilot Plant (WIPP). WIPP is a deep geologic repository located in southeastern New Mexico and is now in the testing phase of development. All waste received by Wipp must conform with established Waste Acceptance Criteria (WAC). The purpose of the proposed action is to retrieve stored TRU waste and prepare the waste for shipment to and disposal WIPP. Stored TRU waste LANL is represented by four waste forms. The facilities necessary for work-off activities are tailored to the treatment and preparation of these four waste forms. Preparation activities for newly generated TRU waste are also covered by this action.

Not Available

1990-10-26T23:59:59.000Z

205

The Discovery and Interpretation of the Cerenkov effect The observance of the Cerenkov effect in 1934 and the subsequent work Pavel  

E-Print Network (OSTI)

1 The Discovery and Interpretation of the Cerenkov effect The observance of the Cerenkov effect in 1934 and the subsequent work Pavel Cerenkov performed in order to characterize the electromagnetic of the practical applications for his work, Cerenkov was awarded the Nobel Prize in Physics in 1958 along

Wang, Yan Mei

206

Final work plan : phase II investigation of potential contamination at the former CCC/USDA grain storage facility in Savannah, Missouri.  

Science Conference Proceedings (OSTI)

From approximately 1949 until 1970, the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility on federally owned property approximately 0.25 mi northwest of Savannah, Missouri (Figure 1.1). During this time, commercial grain fumigants containing carbon tetrachloride were commonly used by the CCC/USDA and the private grain storage industry to preserve grain in their facilities. In November 1998, carbon tetrachloride was detected in a private well (Morgan) roughly 50 ft south of the former CCC/USDA facility, as a result of statewide screening of private wells near former CCC/USDA facilities, conducted in Missouri by the U.S. Environmental Protection Agency (EPA 1999). The 1998 and subsequent investigations by the EPA and the Missouri Department of Natural Resources (MoDNR) confirmed the presence of carbon tetrachloride in the Morgan well, as well as in a second well (on property currently occupied by the Missouri Department of Transportation [MoDOT]) described as being approximately 400 ft east of the former CCC/USDA facility. The identified concentrations in these two wells were above the EPA maximum contaminant level (MCL) and the Missouri risk-based corrective action default target level (MRBCA DTL) values of 5.0 {micro}g/L for carbon tetrachloride in water used for domestic purposes (EPA 1999; MoDNR 2000a,b, 2006). Because the observed contamination in the Morgan and MoDOT wells might be linked to the past use of carbon tetrachloride-based fumigants at its former grain storage facility, the CCC/USDA is conducting an investigation to (1) characterize the source(s), extent, and factors controlling the subsurface distribution and movement of carbon tetrachloride at Savannah and (2) evaluate the potential risks to human health, public welfare, and the environment posed by the contamination. This work is being performed in accord with the Intergovernmental Agreement established between the Farm Service Agency of the USDA and the MoDNR, to address carbon tetrachloride contamination potentially associated with a number of former CCC/USDA grain storage facilities in Missouri. The site characterization at Savannah is being conducted on behalf of the CCC/USDA by the Environmental Science Division of Argonne National Laboratory. The investigation at Savannah is being conducted in phases. This approach is being used by the CCC/USDA and Argonne, with the approval of the MoDNR, so that information obtained and interpretations developed during each incremental stage of the investigation can be used most effectively to guide subsequent phases of the program. Phase I of the Savannah program was conducted in October-November 2007 and January 2008 (Argonne 2007a, 2008). This site-specific Work Plan provides a brief summary of the Phase I findings and the results of groundwater level monitoring that has been ongoing since completion of the Phase I study and also outlines technical objectives, investigation tasks, and investigation methods for Phase II of the site characterization at Savannah.

LaFreniere, L. M.; Environmental Science Division

2010-08-16T23:59:59.000Z

207

NEHRP - Final Plan Development  

Science Conference Proceedings (OSTI)

... However, NEHRP funds do not support targeted ... FEMA does provide linkage of ongoing work in ... Plan discussion about Strategic Planning Principles ...

208

Working Copy  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE/WIPP-99-2286 Waste Isolation Pilot Plant Environmental Notification or Reporting Implementation Plan Revision 7 U.S. Department of Energy December 2013 This document supersedes DOE/WIPP-99-2286, Rev. 6. Working Copy Waste Isolation Pilot Plant Environmental Notification or Reporting Implementation Plan DOE/WIPP-99-2286, Rev. 7 2 TABLE OF CONTENTSCHANGE HISTORY SUMMARY .............................................. 3 ACRONYMS AND ABBREVIATIONS ............................................................................ 4 1.0 INTRODUCTION .................................................................................................. 6 2.0 NOTIFICATION OR REPORTING REQUIREMENTS AND COMMITMENTS ..... 7

209

Remedial investigation work plan for Chestnut Ridge Operable Unit 4 (Rogers Quarry/Lower McCoy Branch) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee  

SciTech Connect

The Oak Ridge Y-12 Plant includes - 800 acres near the northeast comer of the reservation and adjacent to the city of Oak Ridge (Fig. 1-1). The plant is a manufacturing and developmental engineering facility that produced components for various nuclear weapons systems and provides engineering support to other Energy Systems facilities. More than 200 contaminated sites have been identified at the Y-12 Plant that resulted from past waste management practices. Many of the sites have operable units (OUs) based on priority and on investigative and remediation requirements. This Remedial Investigation RI work plan specifically addresses Chestnut Ridge OU 4. Chestnut Ridge OU 4 consists of Rogers Quarry and Lower McCoy Branch (MCB). Rogers Quarry, which is also known as Old Rogers Quarry or Bethel Valley Quarry was used for quarrying from the late 1940s or early 1950s until about 1960. Since that time, the quarry has been used for disposal of coal ash and materials from Y-12 production operations, including classified materials. Disposal of coal ash ended in July 1993. An RI is being conducted at this site in response to CERCLA regulations. The overall objectives of the RI are to collect data necessary to evaluate the nature and extent of contaminants of concern, support an Ecological Risk Assessment and a Human Health Risk Assessment, support the evaluation of remedial alternatives, and ultimately develop a Record of Decision for the site. The purpose of this work plan is to outline RI activities necessary to define the nature and extent of suspected contaminants at Chestnut Ridge OU 4. Potential migration pathways also will be investigated. Data collected during the RI will be used to evaluate the risk posed to human health and the environment by OU 4.

Not Available

1993-09-01T23:59:59.000Z

210

Work Address:  

NLE Websites -- All DOE Office Websites (Extended Search)

BO SAULSBURY BO SAULSBURY Work Address: Home Address: Oak Ridge National Laboratory 12952 Buckley Road National Transportation Research Center Knoxville, TN 37934 Building NTRC-2, Room 118 (865) 288-0750 Oak Ridge, TN 37831-6479 (865) 574-4694 saulsburyjw@ornl.gov Technical Specialties: Land use planning Environmental and socioeconomic impact assessment National Environmental Policy Act (NEPA) project management Vehicle fuel economy Education: 1986 B. A., History (minors in English and Business), The University of Tennessee 1989 M. S., Planning, The University of Tennessee (Thesis title: Land Use Compatibility Planning for Airfield Environs: Intergovernmental Cooperation to Protect Land Users From the Effects of Aircraft Operations)

211

Geophysical survey work plan for White Wing Scrap Yard (Waste Area Grouping 11) at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect

The White Wing Scrap Yard, located on the U.S. Department of Energy`s Oak Ridge Reservation, served as an aboveground storage and disposal area for contaminated debris and scrap from the Oak Ridge K-25 Site, the Oak Ridge Y-12 Plant, and the Oak Ridge National laboratory. The site is believed to have been active from the early 1950s until the mid-1960s. A variety of materials were disposed of at the site, including contaminated steel tanks and vehicles. As an interim corrective action, a surface debris removal effort was initiated in November 1993 to reduce the potential threat to human health and the environment from the radionuclide-contaminated debris. Following this removal effort, a geophysical survey will be conducted across the site to locate and determine the lateral extent of buried nonindigenous materials. This survey will provide the data necessary to prepare a map showing areas of conductivity and magnetic intensity that vary from measured background values. These anomalies represent potential buried materials and therefore can be targeted for further evaluation. This work plan outlines the activities necessary to conduct the geophysical survey.

Not Available

1994-02-01T23:59:59.000Z

212

Searching for Planets During Predicted Mesolensing Events: II. PLAN-IT: An Observing Program and its Application to VB 10  

E-Print Network (OSTI)

The successful prediction of lensing events is a new and exciting enterprise that provides opportunities to discover and study planetary systems. The companion paper investigates the underlying theory. This paper is devoted to outlining the components of observing programs that can discover planets orbiting stars predicted to make a close approach to a background star. If the time and distance of closest approach can be well predicted, then the system can be targeted for individual study. In most cases, however, the predictions will be imprecise, yielding only a set of probable paths of approach and event times. We must monitor an ensemble of such systems to ensure discovery, a strategy possible with observing programs similar to a number of current surveys, including PTF and Pan-STARRS; nova searches, including those conducted by amateurs; ongoing lensing programs such as MOA and OGLE; as well as MEarth, Kepler and other transit studies. If well designed, the monitoring programs will be guaranteed to either ...

Di Stefano, Rosanne; Lepine, Sebastien

2012-01-01T23:59:59.000Z

213

Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Strategic Plan Print ALS Strategic Plan Update: March 2013 The Advanced Light Source Strategic Plan, originally published in 2009, has been revised to reflect completed...

214

TEC Working Group Topic Groups Rail Conference Call Summaries...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Planning Subgroup Planning Subgroup March 30, 2006 February 15, 2006 Draft...

215

GEO Secretariat Global Earth Observing System of  

E-Print Network (OSTI)

Secretariat Vegetation greenness profiles North America Vegetation Annual Greenness Profiles 100 120 140 160;© GEO Secretariat GEO 2009-11 Work Plan ­ Related Task DA-09-05: Global Carbon Observation and Analysis System Implement a global carbon observation and analysis system addressing the three components

216

Planning and Management Consultants, Limited (PMCL) Task Order # 62: Assessment and Incorporation of Risk Management Principles into USACE Civil Works Infrastructure  

E-Print Network (OSTI)

The project summarized in this report had two objectives. The first objective was to develop and test a valid and viable methodology that could be used by the USACE to prioritize Operations and Maintenance (O&M) general funding between civil infrastructure protection and ongoing maintenance funds. Various multi attribute decision modeling and analysis methodologies were studied and a method based on the Analytic Hierarchy Process (AHP) as implemented in the software tool Expert Choice was proposed for use in a USACE case study. The second objective was to demonstrate the prioritization model in a case study. The North West Division (NWD) was chosen as geographical domain for testing this integrated prioritization methodology and nine USACE project sites on the Columbia/Snake River system were selected as the test bed. This case study required the prioritization of several security work packages and hundreds of operations and maintenance work packages. The case study demonstrated that security related O&M work packages may be integrated into the O&M budget using a structured prioritization method. The AHP based multi-attribute Decision Model constructed for this demonstration project was a four level hierarchy designed to reflect the USACE strategy of managing by business lines. The top Level (Level 1) states the USACE O&M goal, to maintain the design benefits of USACE projects by meeting

Gregory Shaw D. Sc

2005-01-01T23:59:59.000Z

217

Climate VISION: Private Sector Initiatives: Oil and Gas: Work...  

Office of Scientific and Technical Information (OSTI)

Work Plans API has developed a work plan based on API's commitment letter and the Climate Challenge Program which addresses the overall elements of the Climate VISION program...

218

High DSM Scenario Request for the 2011 TEPPC Transmission Expansion Plan (and Treatment of DSM in Reference Case/Other Scenarios) Recommendation of the State/Provincial Steering Committee DSM Working Group  

E-Print Network (OSTI)

At the November 6, 2009 meeting of the State-Provincial Steering Committee (SPSC), the SPSC agreed that it would submit a high DSM scenario to TEPPC and requested that the DSM Working Group prepare the request, for review and approval by the SPSC. This document outlines the approach recommended by the DSM Work Group for developing a high DSM scenario, to be modeled in the 2011 TEPPC 10-Year Transmission Expansion Plan. 1 In addition, the DSM Working Group has developed recommendations for the treatment of DSM in the reference case and two scenarios (Carbon Reduction and Breakthrough Technology) proposed by the Scenario Working Group. Table 1 sets for the recommended approach for these items, for energy efficiency (EE), demand response (DR), combined heat and power (CHP) and distribution system efficiency upgrades. These recommendations have been informed by the technical assistance of Lawrence Berkeley National Laboratory (LBNL) and the non-state officials participating in the DSM Working Group, as well as the state official/commissioner members of the Group.

unknown authors

2009-01-01T23:59:59.000Z

219

Report: EM Strategic Planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

STRATEGIC PLANNING STRATEGIC PLANNING September 25, 2008 Submitted by the EMAB Strategic Planning Subcommittee Background In Fiscal Year (FY) 2008, the Environmental Management Advisory Board (EMAB) was tasked to assess EM's strategic planning capabilities/processes and, in particular, to review the status of the initiatives pursued by the Office of Strategic Planning and Analysis (EM-32). This charge was derived from the Board's work pertaining to the topics of Discretionary Budgeting and Technical Uncertainty and Risk Reduction, which were addressed in previous reports and recommendations to the Assistant Secretary. The EMAB Strategic Planning Committee was formed to expand on this earlier work and pursue dialogues with the EM Office of Program Planning and Budget (EM-30) in

220

Transmission Planning: Institutional Issues in the West | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning: Institutional Issues in the West Transmission Planning: Institutional Issues in the West Prepared for The CREPC Transmission Planning and Expansion Work Group by the...

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

TEACHING PLAN FOR BUSINESS MARKETING  

E-Print Network (OSTI)

and demographic trends. Technological evolution 1 30 Work on Marketing Plan: Macroenvironment 2 30 8 Session 6 on Marketing Plan: Macroenvironment 2 30 9 Seminar 3 Friday 28 January Case preparation 1 30 Case study: Textiles Garcia 55 Work on Marketing Plan: Macroenvironment 2 30 #12;Class preparation T Activity in class

Catalonia, Technical University of

222

Baruch Plan Presented | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > Baruch Plan Presented Baruch Plan Presented...

223

comments to the draft Stakeholder Engagement Plan (SE-93) and the Terms of Reference of the Reliability Standards Auditing Working Group (RSAWG) regarding the Compliance Auditing of Reliability Standards for Ontario Market Participants. Hydro  

E-Print Network (OSTI)

One offers the following comments for your consideration: 1. The first objective listed on page 2 of the draft engagement plan states that the stakeholder engagements goal is to provide stakeholders the opportunity to provide feedback to MACD on their business needs around the auditing process (e.g. audit preparation materials, timing of deadlines, etc). However, on page 1 of the plan, items such as evidentiary requirements and disclosure of audit results are listed as Out of Scope. Hydro One submits that these items and others are important parts of the audit process and should be discussed and agreed on so Ontario entities can prepare accordingly. 2. The last bullet in the Terms of Reference document states that the Working Group is meant to provide advice and as a result consensus is not a goal of the engagement. Hydro One submits that, considering that Market Rule amendments will need to be in place (including Stakeholders Engagement, Technical Panel and IESO Board of Directors approval) to allow MACD to proceed with audit activities in Ontario, the RSAWG is the appropriate group to discuss and reach

unknown authors

2011-01-01T23:59:59.000Z

224

Remedial investigation work plan for Bear Creek Valley Operable Unit 2 (Rust Spoil Area, SY-200 Yard, Spoil Area 1) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The enactment of the Resource Conservation and Recovery Act (RCRA) in 1976 and the Hazardous and Solid Waste Amendments (HSWA) to RCRA in 1984 created management requirements for hazardous waste facilities. The facilities within the Oak Ridge Reservation (ORR) were in the process of meeting the RCRA requirements when ORR was placed on the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) National Priorities List (NPL) on November 21, 1989. Under RCRA, the actions typically follow the RCRA Facility Assessment (RFA)/RCRA Facility Investigation (RFI)/Corrective Measures Study (CMS)/Corrective Measures implementation process. Under CERCLA the actions follow the PA/SI/Remedial Investigation (RI)/Feasibility Study (FS)/Remedial Design/Remedial Action process. The development of this document will incorporate requirements under both RCRA and CERCLA into an RI work plan for the characterization of Bear Creek Valley (BCV) Operable Unit (OU) 2.

Not Available

1993-05-01T23:59:59.000Z

225

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

TURBINES U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States...

226

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

SEPTEMBER 2013 CARBON STORAGE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the...

227

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United...

228

Lesson Plans!  

NLE Websites -- All DOE Office Websites (Extended Search)

you from other teachers, educators, and professionals. These lesson plans are provided free of charge, to help you planning a challenging curriculum that will instill a love of...

229

Medical Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Medical Plans Retiree Medical Insurance Blue Cross Blue Shield of New Mexico (BCBSNM) is the provider of medical benefits. Contact Retiree Insurance Providers Medical plan options...

230

Transmission Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Transmission Planning We accept requests from electric utilities, firm-power customers, private power developers, and independent power generators to interconnect...

231

2 Retirement Plans Comparison 4 How the Plan Works  

E-Print Network (OSTI)

contact: n TIAA-CREF: www.tiaa-cref.org n Vanguard: www.vanguard.com n Benefits Office: benefits Enroll only once. Your October contribution rate and percentage allocation between your TIAA to invest with TIAA-CREF and Vanguard, all contributions are deducted automat- ically from each paycheck. n

Scherer, Norbert F.

232

Groundwater Monitoring Well Installation Work Plan  

E-Print Network (OSTI)

, etc.) will be delivered to each well site in factory-sealed containers and remain in such until used) for the secondary upper pack · 3/8-inch bentonite pellets/chips seal · schedule 40 PVC blank casing · 30% solids, as determined by the Stoller geologist, the placement of a 5-feet bentonite seal (3/8-inch bentonite pellets

233

Draft Work Plan Environmental Assessment and Characterization  

E-Print Network (OSTI)

connections to the campus network system. There is a community center which contains the laundry facility harmony among those connected with or interested in the school, including students, alumni, faculty

234

Interagency Working Groups (IWGs)  

NLE Websites -- All DOE Office Websites (Extended Search)

Interagency Working Groups (IWGs) Print E-mail Interagency Working Groups (IWGs) Print E-mail Interagency Working Groups (IWGs) are the primary USGCRP vehicles for implementing and coordinating research activities within and across agencies. These groups are critical to Program integration and in assessing the Program's progress. The working groups span a wide range of interconnected issues of climate and global change, and address major components of the Earth's environmental and human systems, as well as cross-disciplinary approaches for addressing these issues. IWGs correspond to program functions and are designed to bring agencies together to plan and develop coordinated activities, implement joint activities, and identify and fill gaps in the Program's plans. They allow public officials to communicate with each other on emerging directions within their agencies, on their stakeholder needs, and on best practices learned from agency activities. Together, these functions allow the agencies to work in a more coordinated and effective manner.

235

2011-2020 Strategic Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

a quick idea of how this plan has evolved, we'll start by observing that the job of a strategic plan is not to suggest that we keep on doing the same thing as before; it is,...

236

Planning Workshop  

Science Conference Proceedings (OSTI)

Planning Workshop on Renewable Energy and Climate Science for the Americas: Metrology and Technology Challenges. ...

2013-12-05T23:59:59.000Z

237

TEC Working Group Topic Groups Rail Key Documents Intermodal...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Intermodal Subgroup TEC Working Group Topic Groups Rail Key Documents Intermodal Subgroup Intermodal Subgroup Draft Work Plan More Documents & Publications TEC Working Group Topic...

238

Alaska Strategic Energy Plan and Planning Handbook  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Alaska Strategic Energy Plan and Planning Handbook A. Dane and L. Doris National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence Ave. SW, Washington DC 20585 | 202-586-1272 energy.gov/indianenergy | indianenergy@hq.doe.gov Alaska Strategic Energy Plan and Planning Handbook ii NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned

239

EMSL Strategic Plan 2008  

SciTech Connect

This Strategic Plan is EMSLs template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges of the Department of Energy and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOEs Office of Biological and Environmental Research, and other key stakeholders. This Strategic Plan is fully aligned with the strategic plans of DOE and its Office of Science. We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Strategic Plan should be viewed as a living document for which we will continually evaluate changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly.

Campbell, Allison A.

2008-08-15T23:59:59.000Z

240

Notes from September 13, 2012, DOE Fugitive Emissions Working...  

NLE Websites -- All DOE Office Websites (Extended Search)

emissions. The Chair encouraged FEWG members to work with their respective Site Sustainability Plan (SSP) authors to ensure that the fugitive emissions cuts and plans continue...

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Strategic Plans | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategic Plans Strategic Plans Strategic Plans September 20, 2013 DOE OIG Strategic Plan Fiscal Years 2014 - 2019 The Office of Inspector General's plan to strengthen the integrity, economy, and efficiency of the Department's programs and operations. December 31, 2007 DOE OIG Strategic Plan Fiscal Years 2009 - 2013 This Strategic Plan offers a glance at the Office of the Inspector General's long term effort to work with the Department of Energy's leadership to improve the management and performance of the Department's programs and operations. December 31, 2002 DOE OIG Strategic Plan Fiscal Years 2003-2008 This plan represents the Office of the Inspector General's vision and strong commitment for improving the management and performance of the Department of Energy's many programs and operations

242

Maintenance Work Management Improvement: Improving Culture and Work Process  

Science Conference Proceedings (OSTI)

EPRI's Plant Maintenance Optimization (PMO) mission is to develop and demonstrate products and services for improved use of power plant maintenance resources and increased profitability. Based on a series of work management improvement projects, EPRI plans to develop a best practices guideline. As part of this effort, this document details how to improve fossil power plant work culture and work processes.

1998-06-16T23:59:59.000Z

243

Conservation Resource Advisory Role in Council Plan DevelopmentRole in Council Plan Development  

E-Print Network (OSTI)

Conservation Resource Advisory Committee Role in Council Plan DevelopmentRole in Council Plan on conservation resource potential and deployment § Work Plan Focused in Policy Issues slide 2 ­ Not a decision Work Plan Elements § Conservation Resource Assessment ­ Cost-Effectiveness Methodology ­ Achievable

244

Security Plans  

Science Conference Proceedings (OSTI)

... Appendix A Glossary - A glossary of security terms used within the security planning document. ... F, Glossary. None applicable.

2013-09-30T23:59:59.000Z

245

EMSL Contribution Plan  

Science Conference Proceedings (OSTI)

This Contribution Plan is EMSLs template for achieving our vision of simultaneous excellence in all aspects of our mission as a national scientific user facility. It reflects our understanding of the long-term stewardship we must work toward to meet the scientific challenges faced by the Department of Energy (DOE) and the nation. During the next decade, we will implement the strategies contained in this Plan, working closely with the scientific community, our advisory committees, DOEs Office of Biological and Environmental Research, and other key stakeholders. This Plan is fully aligned with the strategic plans of DOE, its Office of Science, and the Pacific Northwest National Laboratory (PNNL). We recognize that shifts in science and technology, national priorities, and resources made available through the Federal budget process create planning uncertainties and, ultimately, a highly dynamic planning environment. Accordingly, this Plan should be viewed as a living document and we continually evaluate the changing needs and opportunities posed by our stakeholders (i.e., DOE, users, staff, advisory committees), work closely with them to understand and respond to those changes, and align our strategy accordingly. This Plan is organized around two sections. Section 1 describes our vision and four strategic outcomes: 1) Scientific Innovation, 2) Capabilities that Transform Science, 3) Outstanding Management and Operations, and Engaged and Proactive Users. These outcomes provide the framework for seven critical actions we must take during the next 3 to 5 years: 1) Establishing leadership in EMSL science themes, 2) building and deploying transformational capabilities, 3) integrating computation with experiment, 4) ensuring EMSLs workforce meets the scientific challenges of the future, 5) creating partnerships, 6) attracting and engaging users in EMSLs long-term strategy, and 7) building a research infrastructure that meets emerging scientific needs. Section 2 describes EMSLs detailed business plan, including an analysis of opportunity, organizational investments, and actionable milestones.

Campbell, Allison A.

2008-12-01T23:59:59.000Z

246

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Prioritization of Facility Hazards Examples Prioritization of Facility Hazards Examples Example 20 7.7 PRELIMINARY HAZARD ANALYSIS Table 7-1 Preliminary Hazard Analysis (PHA) Overview for 779 Cluster's Decommissioning and Dismantlement Major Work Task Hazard Cause Preventive Measures Perform building walkdowns to identify Integrated Work Control Package (IWCP) work steps. Tripping, falling, exposure to chemicals, hazardous substances and / or radioactive materials. Also exposure to noise hazards. No planning, lack of communicating between work groups, improper use of Radiological Work Permits (RWPs), not following room or building instructions.  Develop Activity Hazard Analysis (AHA).  Conduct effective pre-evolution briefings.

247

Strategic Action Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Utility Program Strategic Action Plan David McAndrew Background * Result of FUPWG Fall 2006 Meeting * Responds to challenge issued FEMP's Director * Based on the feedback from the FUPWG Fall working group session * Will require FUPWG member active participation for success FEMP Challenge * Accelerate project planning and implementation * Double current project investment levels * Double the number of utilities offering UESCs * Enhance the partnerships between utilities and agencies * Maximize the use, by agencies, of additional services offered by utilities to meet the government's goals for EERE Fall FUPWG Working Session Questions * How can we double the level of project investment from its current level

248

State and Local Energy Assurance Planning | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

State and Local Energy Assurance Planning State and Local Energy Assurance Planning OE works closely with State and local governments on energy assurance issues. The office...

249

Aggregate Production Planning for Process Industries under Competition  

E-Print Network (OSTI)

A Linear Programming Approach to Production and EmploymentA.C. 1978. Aggregate Production Planning. Handbook ofH.A. Simon. 1960. Planning Production, Inventories and Work

Karmarkar, U. S.; Rajaram, K.

2008-01-01T23:59:59.000Z

250

Office of Inspector General Annual Performance Plan 2012 | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

251

Annual Performance Report FY 2004 Annual Performance Plan FY...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

252

Planned Audits and Inspections FY 2013 | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOIA Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About...

253

Task Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Task Plans Task Plans This page contains links to a tentative listing of active and closed TEC Task Plans. Final status of these task plans will be determined after the July 2000 TEC meeting. Task Plan Number/Title DOE Lead Staff Last Update Comment Status/ New No. After 7/27/00 GP-1, Section 180(c) Coordination (begun 1/96) C. Macaluso 7/98 DOE published a Revised Proposed Policy and Procedures in April 1998; no final policy will be issued until a definitive date for NWPA shipments is determined, based on site suitability or other legislative direction. To the extent that any issues related to Section 180(c) arise in TEC meetings, they are being discussed in the context of the consolidated grant topic group which is covered by another task plan. Closed

254

Decommissioning Planning  

Science Conference Proceedings (OSTI)

The purpose of this EPRI Technical Report is to provide a series of pre-planning guidance documents for the decommissioning of a nuclear power plant. This guidance is based in part upon Nuclear Decommissioning Plans (NDPs) developed by Commonwealth Edison (now Exelon) following the premature closure of Zion Station in 1998 as well as from other industry references and experience. These NDPs focus on the planning activities over the period from prior to final shutdown through the transition period into de...

2006-11-15T23:59:59.000Z

255

Management Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Plan (SSMP) to be submitted to Congress after the April 2010 release of the Nuclear Posture Review Report. It is aligned with the President's National Security Strategy...

256

Emergency Plans  

Science Conference Proceedings (OSTI)

... Early Dismissal (Early Closing) Due to Inclement Weather - Snow/Ice or Emergency Situation. ... Emergency Situation - "Shelter-in-Place" Plan. ...

2013-02-18T23:59:59.000Z

257

Climate VISION: Private Sector Initiatives: Electric Power: Work...  

Office of Scientific and Technical Information (OSTI)

Work Plans The power sector, through EPICI, submitted its work plan in the form of a Memorandum of Understanding (MOU) with DOE. The MOU, most recently updated in September 2006,...

258

PROJECT MANGEMENT PLAN EXAMPLES Feedback Examples  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

already in effect for 9206 operations, such as plan-of-the-day, daily crew briefs, pre-job briefs, hazard identification, work planning, review of lessons learned, worker...

259

Policy & Strategic Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Laboratory Directed R&D Laboratory Directed R&D Office of Technology Commercialization and Partnerships Other Information BNL Site Index Can't View PDFs? Policy & Strategic Planning Directorate Policy and Strategic Planning (P&SP) Directorate coordinates development of the Laboratory Strategic Plan and annual business plans at the institutional and organizational Level. This function includes administration of the Laboratory Directed Research and Development (LDRD) program. The Directorate is also responsible for the Laboratory's technology transfer functions, including collaborations with industry and work for others; and for increasing funding from sources other than DOE. Organization Chart (pdf) Top of Page Last Modified: June 4, 2013 Please forward all questions about this site to: Teresa Baker

260

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

Not Available

1993-03-15T23:59:59.000Z

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

1993-03-15T23:59:59.000Z

262

Environmental Implementation Plan  

SciTech Connect

The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

1993-03-15T23:59:59.000Z

263

Milestone Plan Process Improvement  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Milestone Plan Process Improvement Milestone Plan Process Improvement Milestone Plan Process Improvement Background In response to our community's concern over the milestone plan (MP) process within the system, the STRIPES Project Office initiated an in-depth evaluation of the required steps and issues surrounding this process. We concluded that the MP process could be improved for most users by tuning the system configuration. With the approval of both the STRIPES Executive Steering Committee and the STRIPES Project Office, we launched the MP Process Improvement Initiative. After many meetings with members of the STRIPES Team and Working Group, we are ready to "go-live" with this initiative. On October 1 st , 2012 the new MP process will be implemented for use by most field offices.

264

Working Copy  

NLE Websites -- All DOE Office Websites (Extended Search)

NWP subcontractor personnel work at a number of DOE generator sites where NWP has no direct contractual authority for overall site operations. NWP has therefore negotiated...

265

DOE CONTRACTOR PENSION PLANS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1-13 1-13 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental remediation, infrastructure services and other site-specific project completion contracts. DOE-H-1002 EMPLOYEE COMPENSATION: PAY AND BENEFITS (a) Contractor Employee Compensation Plan The Contractor shall submit, for Contracting Officer approval, by (fill-in

266

Work Authorization System  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, D.C. DOE O 412.1A Approved: 4-21-05 This directive was reviewed and certified as current and necessary by Susan J. Grant, Director, Office of Management, Budget and Evaluation/Chief Financial Officer, 4-21-05. SUBJECT: WORK AUTHORIZATION SYSTEM 1. OBJECTIVES. To establish a work authorization and control process for work performed by designated site and facility management contractors, and other contractors as determined by the procurement executive, consistent with the budget execution and program evaluation requirements of the Department of Energy's (DOE's) Planning, Programming, Budgeting, and Evaluation process. 2. CANCELLATIONS. DOE O 412.1 Work Authorization System, dated 4-20-99. Cancellation of a directive does not, by itself, modify or otherwise affect any contractual

267

National Action Plan on Demand Response  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Action Plan on Demand National Action Plan on Demand Action Plan on Demand National Action Plan on Demand Response Response Federal Utilities Partnership Working Group Federal Utilities Partnership Working Group November 18, 2008 November 18, 2008 Daniel Gore Daniel Gore Office of Energy Market Regulation Office of Energy Market Regulation Federal Energy Regulatory Commission Federal Energy Regulatory Commission The author's views do not necessarily represent the views of the Federal Energy Regulatory Commission Presentation Contents Presentation Contents Statutory Requirements Statutory Requirements National Assessment [Study] of Demand Response National Assessment [Study] of Demand Response National Action Plan on Demand Response National Action Plan on Demand Response General Discussion on Demand Response and Energy Outlook

268

TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Radiation Monitoring Subgroup TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring Subgroup Radiation Monitoring Subgroup Draft Work Plan - February 4, 2008 More...

269

GRIPS Plan  

DOE Green Energy (OSTI)

The GRIPS (Geothermal Resources Impact Projection Study) Commission was established by a Joint Powers Agreement between the California Counties of Lake, Mendocino, Napa, and Sonoma. The objectives of GRIPS are primarily to develop and use a cooperative environmental data collection and use system including natural, social, and economic considerations to facilitate their independent decisions and those of State and Federal agencies related to the environmental effects of geothermal development. This GRIPS Plan was prepared from a wide range of studies, workshops, and staff analyses. The plan is presented in four parts: summary and introduction; environmental data status report; planned programs; and budget. (MHR)

Not Available

1978-07-31T23:59:59.000Z

270

Environmental Implementation Plan  

SciTech Connect

The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

1994-02-01T23:59:59.000Z

271

Work Manager  

Science Conference Proceedings (OSTI)

A real-time control system has been developed and deployed nationally to support BTs work management programme. This paper traces the history, system architecture, development, deployment and service aspects of this very large programme. Many ...

G. J. Garwood

1997-01-01T23:59:59.000Z

272

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

End Point Closeout Examples Example 77 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field representative will verify acceptable completion of the applicable activity. Verification may be performed by reviewing documents, letters, photos, work packages, or work plans, or by visual inspection. When all the endpoints for a specific area of the building have been completed and verified, designated BWHC and BHI management will sign for completion and acceptance of that

273

Strategic plan for infrastructure optimization  

SciTech Connect

This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructure and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.

Donley, C.D.

1998-05-27T23:59:59.000Z

274

Test plan  

U.S. Energy Information Administration (EIA)

3.0 TEST PLAN METHODOLOGY 8. 3.1 Assumptions 8. 3.2 Methodology 8. 4.0 COMMENTS ON INITIAL VIEW OF THE DATA 16 1.0 INTRODUCTION. EIA tasked Allied ...

275

ORISE: Operations Support and Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Securing the Golden State Amber Waves 2012 Bureau of Reclamation Emergency Management Issues Special Interest Group Golden Guardian Joint Information Center Preventing Nuclear Smuggling Program Training and Technology Support Resources How to Work With Us Contact Us Oak Ridge Institute for Science Education Operations Support and Planning Operations Support and Planning The Oak Ridge Institute for Science and Education (ORISE) provides operations and planning support to the U.S. Department of Energy (DOE), Federal Emergency Management Agency and other government agencies for their counterterrorism and emergency response readiness programs. ORISE's planning, logistical and administrative support areas are focused on enhancing the radiological preparedness and response coordination

276

Performance Management Plan  

SciTech Connect

This Performance Management Plan describes the approach for accelerating cleanup activities of U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Operations Office (NNSA/NV) Environmental Management (EM) Program. This approach accelerates the reduction of risk at NNSA/NV sites while performing the work responsibly, effectively, and more efficiently. In May 2002, NNSA/NV EM and the Nevada Division of Environmental Protection signed a Letter of Intent formalizing an agreement to pursue accelerated risk reduction and cleanup for activities within the State of Nevada. This Performance Management Plan provides the strategic direction for implementing the Letter of Intent.

IT Corporation, Las Vegas, NV

2002-08-21T23:59:59.000Z

277

Plutonium Vulnerability Management Plan  

Science Conference Proceedings (OSTI)

This Plutonium Vulnerability Management Plan describes the Department of Energy`s response to the vulnerabilities identified in the Plutonium Working Group Report which are a result of the cessation of nuclear weapons production. The responses contained in this document are only part of an overall, coordinated approach designed to enable the Department to accelerate conversion of all nuclear materials, including plutonium, to forms suitable for safe, interim storage. The overall actions being taken are discussed in detail in the Department`s Implementation Plan in response to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. This is included as Attachment B.

NONE

1995-03-01T23:59:59.000Z

278

Fugitive Emissions in 2010 Site Sustainability Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Fugitive Emissions in 2010 Site Sustainability Plans Josh Silverman Chair, Fugitive Emissions Working Group Office of Environmental Policy and Assistance (HS-22) April 14, 2011 2...

279

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

System Closure Plan Examples System Closure Plan Examples Example 61 7.5 Endpoint Closure The endpoint documents have grouped the building spaces and systems into a number of manageable areas. The areas are closely related to the engineering work plans that guide completion of many of the endpoints. Endpoint closure methods and practices are provided in the attachment of this PMP. On completion of an endpoint, a BWHC field representative will initial complete on the field copy of the endpoint document. A BHI field representative will verify acceptable completion of the applicable activity. Verification may be performed by reviewing documents, letters, photos, work packages, or work plans, or by visual inspection. When all the endpoints for a specific area of the building have been completed and verified, designated BWHC and BHI management will sign for completion and acceptance of that

280

River Protection Project (RPP) Environmental Program Plan  

SciTech Connect

This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Plan (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of six core functions. Each section of this plan describes the activities of the River Protection Project (RPP) (formerly known as the Tank Waste Remediation System) Environmental organization according to the following core functions: Establish Environmental Policy; Define the Scope of Work; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Perform Work within Controls; and Provide Feedback and Continuous Improvement.

POWELL, P.A.

2000-03-29T23:59:59.000Z

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Baselines - Baselines - Performance Baseline Examples Example 34 6.0 PROJECT BASELINE This section presents a summary of the PFP Stabilization and Deactivation Project baseline, which was prepared by an inter- contractor team to support an accelerated planning case for the project. The project schedules and associated cost profiles presented in this section are compared to the currently approved project baseline, as contained in the Facility Stabilization Project Fiscal Year 1999 Multi-Year Work Plan (MYWP) for WBS 1.4 (FDH 1998). These cost and schedule details will provide the basis for a baseline change request that will be processed to revise the MYWP, consistent with the accelerated project plan presented below. 6.1 Project Baseline Overview This section of the IPMP presents the PFP baseline cost and schedule summary. The currently approved PFP Stabilization and

282

Customer Service Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Customer Service Plan Department of Energy Customer Service Plan - 2011 1 A Message from the Secretary Over the past two and a half years, the Obama Administration and the Department of Energy have worked to make the federal government more open for the American public and its own employees. Through these efforts, we have significantly expanded the amount and breadth of information available online about our programs and services. We have also transformed the way we communicate with the public by relaunching Energy.gov, making it an interactive, streamlined information platform. In April, President Obama directed federal agencies to take this ongoing effort one step further and establish Customer Service Plans, improving the public's interactions with the

283

Optics Supply Planning System  

Science Conference Proceedings (OSTI)

The purpose of this study is to specify the design for an initial optics supply planning system for NIF, and to present quality assurance and test plans for the construction of the system as specified. The National Ignition Facility (NIF) is a large laser facility that is just starting operations. Thousands of specialized optics are required to operate the laser, and must be exchanged over time based on the laser shot plan and predictions of damage. Careful planning and tracking of optic exchanges is necessary because of the tight inventory of spare optics, and the long lead times for optics procurements and production changes. Automated inventory forecasting and production planning tools are required to replace existing manual processes. The optics groups members who are expected to use the supply planning system are the stakeholders for this project, and are divided into three groups. Each of these groups participated in a requirements specification that was used to develop this design. (1) Optics Management--These are the top level stakeholdersk, and the final decision makers. This group is the interface to shot operations, is ultimately responsible for optics supply, and decides which exchanges will be made. (2) Work Center Managers--This group manages the on site optics processing work centers. They schedule the daily work center operations, and are responsible for developing long term processing, equipment, and staffing plans. (3) Component Engineers--This group manages the vendor contracts for the manufacture of new optics and the off site rework of existing optics. They are responsible for sourcing vendors, negotiating contracts, and managing vendor processes. The scope of this analysis is to describe the structure and design details of a system that will meet all requirements that were described by stakeholders and documented in the analysis model for this project. The design specifies the architecture, components, interfaces, and data stores of the system at a level of detail that can be used for construction and deployment. Test and quality assurance plans are also included to insure that the system delivers all requirements when it is built. The design is for an automated forecasting prototype that allocates inventory and processing resources in response to potentially daily changes in the forecasted optics exchanges required to operate NIF. It will automatically calculate future inventory levels and processing rates based on current inventory and projected exchanges, procurements, and capacities. It will include screens that allow users to readily assess the feasibility of the forecast, identify failures to meet the demand, revise input data, and re-run the automated forecast calculation. In addition, the system will automatically retrieve the current exchange demand from an external database. Approved forecasts from the system will automatically update work order plans and procurement plans in the existing inventory and production control database. The timing of optics exchanges affects the forecast of damage and future exchanges, so an approved exchange plan will be fed back to the demand database and be used to calculate the next demand projection. The system will read the demand data and update the forecast and output files daily. This specification has been divided into two parts. This document, Part 1 lays out the major design decisions and specifies the architectural, component, and data structure designs. Part 2 will add interface designs, quality assurance and testing plans, and deployment details.

Gaylord, J

2009-04-30T23:59:59.000Z

284

Energy Organizational Planning  

SciTech Connect

As the Seneca Nation of Indians (SNI) continues to refine and finalize its Strategic Energy Plan, it became necessary to insure that a sustainable organization structure was developed through which the energy program and its initiatives could be nurtured and managed. To that end, SNI undertook a study to thoroughly evaluate the existing organizational structures and assess the requisite changes and/or additions to that framework that would complement the mission of the Strategic Plan. The goal of this study was to analyze, work with staff and leadership and recommend the most effective plan for the development of an organizational framework within which the Seneca could more effectively exercise energy sovereignty control and manage their natural resource assets i.e. develop its own energy resources, meet the current and projected energy needs of their community, and sit at the table with other regional energy providers to deal with issues on a peer-to-peer basis.

Gina C. Paradis; James Yockey; Tracey LeBeau

2009-04-17T23:59:59.000Z

285

Alaska Strategic Energy Plan and Planning Handbook | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Plan and Planning Handbook Alaska Strategic Energy Plan and Planning Handbook The Alaska Strategic Energy Plan and Planning Handbook, published by the...

286

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

January 2011) January 2011) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

287

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OCTOBER 2010) OCTOBER 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles  Sound acquisition planning ensures that the contracting process is

288

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chapter 7.1 (May 2012 second revision) Chapter 7.1 (May 2012 second revision) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

289

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

-Chapter 7.1 (May 2012) -Chapter 7.1 (May 2012) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding Principles  Sound acquisition planning ensures that the contracting process is

290

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PLANNING PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 6 Competition Requirements 4. FAR Part 7 Acquisition Planning 5. FAR Part 8 Required Sources of Supply 6. FAR Part 9 Contractor Qualifications 7. FAR Part 10 Market Research 8. FAR Part 11 Describing Agency Needs 9. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 10. FAR Subpart 16.1 Selecting Contract Types 11. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 12. FAR 17 Special Contracting Methods 13. FAR Part 19 Small Business Programs 14. FAR 25.802(a)(2) Other International Agreements and Coordination 15. FAR 34.004 Acquisition Strategy

291

Working Copy  

NLE Websites -- All DOE Office Websites (Extended Search)

1 Effective Date: 11/05/13 WP 12-IS.01-6 Revision 10 Industrial Safety Program - Visitor, Vendor, User, Tenant, and Subcontractor Safety Controls Cognizant Section: Industrial Safety/Industrial Hygiene Approved By: Tom Ferguson Working Copy Industrial Safety Program - Visitor, Vendor, User, Tenant, and Subcontractor Safety Controls WP 12-IS.01-6, Rev. 10 2 TABLE OF CONTENTS CHANGE HISTORY SUMMARY ..................................................................................... 7 ACRONYMS AND ABBREVIATIONS ............................................................................. 8 1.0 INTRODUCTION 1 ............................................................................................... 10 2.0 VISITORS ........................................................................................................... 11

292

Aerocapacitor commercialization plan  

DOE Green Energy (OSTI)

The purpose of the Power-One Aerocapacitor Commercialization Plan is to communicate to members of management and to all employees the overall objectives of the corporation. Power-One, Inc., has participated in a US Federal Government Technology Reinvestment Project (TRP), entitled {open_quotes}Advanced Power Conversion based on the Aerocapacitor{close_quotes}: the project is a group effort, with Lawrence Livermore National Labs, GenCorp/Aerojet, PolyStor Corp. (a start-up company), and Power-One forming the consortium. The expected resulting technology is the {open_quotes}Aerocapacitor{close_quotes}, which possesses much higher performance levels than the usual capacitors on the market today. Power-One hopes to incorporate the Aerocapacitor into some of its products, hence enhancing their performance, as well as market privately-labeled aerocapacitors through its distribution channels. This document describes the details of Power-One`s plan to bring to market and commercialize the Aerocapacitor and Aerocapacitor-based products. This plan was formulated while Power-One was part of the Oerocap project. It has since pulled out of this project. What is presented in this plan is the work which was developed prior to the business decision to terminate this work.

NONE

1995-09-12T23:59:59.000Z

293

Streamlined Approach for Environmental Restoration Work Plan for Corrective Action Unit 461: Joint Test Assembly Sites and Corrective Action Unit 495: Unconfirmed Joint Test Assembly Sites Tonopah Test Range, Nevada  

SciTech Connect

This Streamlined Approach for Environmental Restoration plan addresses the action necessary for the clean closure of Corrective Action Unit 461 (Test Area Joint Test Assembly Sites) and Corrective Action Unit 495 (Unconfirmed Joint Test Assembly Sites). The Corrective Action Units are located at the Tonopah Test Range in south central Nevada. Closure for these sites will be completed by excavating and evaluating the condition of each artillery round (if found); detonating the rounds (if necessary); excavating the impacted soil and debris; collecting verification samples; backfilling the excavations; disposing of the impacted soil and debris at an approved low-level waste repository at the Nevada Test Site

Jeff Smith

1998-08-01T23:59:59.000Z

294

Early Site Permit Model Program Plan  

Science Conference Proceedings (OSTI)

"The Early Site Permit (ESP) Model Program Plan (MPP)" provides step-by-step guidelines on preparing an ESP application. The Plan identifies work tasks necessary to prepare the application and guides applicants on effectively planning and managing the ESP program, including identifying and managing subcontracted resources. A model program plan details how to prepare applications. The MPP also describes interfaces among tasks and provides a generic schedule for executing the steps in preparing an ESP appl...

2002-06-12T23:59:59.000Z

295

SOLID WASTE MANAGEMENT PLAN  

E-Print Network (OSTI)

ACKNOWLEDGMENTS The Chelan County Public Works Department would like to thank the following organizations and individuals for their assistance in the development of this plan: ? Chelan Countys Solid Waste Council members, past and present, and the municipalities they represent. ? Chelan Countys Solid Waste Advisory Committee members, past and present, and the agencies and businesses they represented. ? the ChelanDouglas Health District staff. ? Washington Department of Ecology staff. Chelan County residents and businesses also contributed to this document through comments provided during public meetings and through various other channels. The Board of County Commissioners and the Public Works Department gratefully acknowledge this input by the

unknown authors

2007-01-01T23:59:59.000Z

296

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

H&S Plan Examples H&S Plan Examples Example 46 9.2 HEALTH AND SAFETY STRATEGY B Plant has integrated safety into its management, planning and work practices in order to protect the public, the environment and facility workers against nuclear and non-nuclear hazards associated with facility transition. Based upon the principles of DNFSB Recommendation 95-2, the Plant's approach to safety management includes:  Applicable. standards and requirements specifically identified and implemented  Safety integrated into baseline and detailed planning  Workers and trained safety professionals use a team approach in hazard identification, analysis and control  Graded approach used to tailor controls based upon hazard type and severity  Hazard control integrated into work processes

297

Energy planning and management plan  

Science Conference Proceedings (OSTI)

This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration`s final draft and environmental impact statement, and Energy Planning and Management Program.

NONE

1996-01-01T23:59:59.000Z

298

Public Involvment Plan - Rifle, Colorado  

Office of Legacy Management (LM)

4-TAR 4-TAR MAC-GWRIF 7.1 UMTRA Ground Water Project Public Involvement Plan for the Environmental Assessment of Ground Water Compliance at the New and Old Rifle, Colorado, Uranium Mill Tailings Sites May 1999 Prepared by U.S. Department of Energy Grand Junction Office Grand Junction, Colorado Work performed under DOE Contract No. DE-AC13-96GJ87335 Public Involvement Plan for the Rifle UMTRA Sites Page 2 Introduction This Public Involvement Plan is tiered to the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project Public Participation Plan dated October 1997. This Public Involvement Plan applies to both the Old and New Rifle, Colorado, UMTRA Project sites and details the activities that have been or will be carried out to meet the public participation requirements of the

299

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

--Chapter 7.1 (JUNE 2010) --Chapter 7.1 (JUNE 2010) 2 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination Guiding Principles

300

ACQUISITION PLANNING  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7.1 (May 2010) 7.1 (May 2010) 1 ACQUISITION PLANNING REFERENCES 1. FAR 4.803(a)(1) Contents of Contract Files 2. FAR 5.405(a) Exchange of Acquisition Information 3. FAR Part 7 Acquisition Planning 4. FAR Part 8 Required Sources of Supply 5. FAR Part 10 Market Research 6. FAR 11.402 Factors to Consider in Establishing Schedules 7. FAR 15.201(c) Exchanges with Industry Before Receipt of Proposals 8. FAR Subpart 16.1 Selecting Contract Types 9. FAR 16.504(c) Indefinite-Quantity Contracts - Multiple Award Preference 10. FAR Subpart 17.6 Management and Operating Contracts 11. FAR Part 19 Small Business Programs 12. FAR 25.802(a)(2) Other International Agreements and Coordination 13. FAR 34.004 Acquisition Strategy Guiding Principles

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Berkeley Lab Strategic Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

and Development (LDRD) BER Review Annual Lab Plan Notable Outcomes Division-Level Strategic Planning Related Links Strategic Planning Laboratory Directed Research and...

302

Plan Descriptions & Summaries  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Descriptions & Summaries Retiree Insurance Plans Retiree health and welfare benefits are managed by AonHewitt and Associates. Contact Retiree Insurance Providers Plan...

303

DOE Emergency Public Affairs Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Headquarters Headquarters Office of Public Affairs Emergency Public Affairs Plan The DOE HQ Office of Public Affairs Emergency Public Affairs Plan has been approved for implementation by: __________________________________________________________ Dan Leistikow, Director, HQ Office of Public Affairs Date: ______________ __________________________________________________________ Joseph Krol, Director, HQ Office of Emergency Management Date: ______________ DOE Office of Public Affairs Emergency Public Affairs Plan 1 Purpose The Department of Energy (DOE) HQ Office of Public Affairs (PA) is committed to communicating information about the Department's work in a timely, accurate and accessible way to the news media, general public and employees.

304

Alaska Strategic Energy Plan and Planning Handbook  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Alaska Strategic Energy Plan and Planning Handbook A. Dane and L. Doris National Renewable Energy Laboratory U.S. Department of Energy | Office of Indian Energy 1000 Independence...

305

FACT SHEET: BIOENERGY WORKING GROUP  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

, 2010 , 2010 1 FACT SHEET: BIOENERGY WORKING GROUP At the Clean Energy Ministerial in Washington, D.C. on July 19 th and 20 th , ministers launched a Bioenergy Working Group, which will advance the deployment of bioenergy technologies by implementing recommendations of the Technology Action Plan on Bioenergy Technologies that was released by the Major Economies Forum Global Partnership in December 2009. The Working Group will work in close cooperation with the Global Bioenergy Partnership (GBEP), which is co-chaired by Brazil and Italy. Initial key activities of the Working Group include: 1. Global Bioenergy Atlas: The Working Group will combine and build upon existing databases of sustainably-developed bioenergy potential around the globe and make it available in an open web-

306

Surveillance Guides - Work Control Process  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Control Process Work Control Process 1.0 Objective The objective of this surveillance guide is to provide lines of inquiry for evaluating the effectiveness of the contractor's work control process. Users should be cognizant that the lines of inquiry need to be further tailored to fit specific facilities or activities in accordance with contractual mechanisms such as Maintenance Implementation Plans, Conduct of Operations Implementation Plans, and the Integrated Safety Management System Description. 2.0 References 2.1 DOE 4330.4B Maintenance Management Program 2.2 48 CFR 1970.5204-2 Department of Energy Acquisition Regulations 2.3 DOE O 5480.19, Conduct of Operations 2.4 10 CFR 830.120, Quality Assurance 3.0 Requirements Implemented This surveillance is conducted to verify implementation of Core

307

Fuel Cell Technologies Office: Catalysis Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Catalysis Working Catalysis Working Group to someone by E-mail Share Fuel Cell Technologies Office: Catalysis Working Group on Facebook Tweet about Fuel Cell Technologies Office: Catalysis Working Group on Twitter Bookmark Fuel Cell Technologies Office: Catalysis Working Group on Google Bookmark Fuel Cell Technologies Office: Catalysis Working Group on Delicious Rank Fuel Cell Technologies Office: Catalysis Working Group on Digg Find More places to share Fuel Cell Technologies Office: Catalysis Working Group on AddThis.com... Key Activities Plans, Implementation, & Results Accomplishments Organization Chart & Contacts Quick Links Hydrogen Production Hydrogen Delivery Hydrogen Storage Fuel Cells Technology Validation Manufacturing Codes & Standards Education Systems Analysis

308

PROPOSAL FOR CONTINGENT TRANSMISSION PLANS  

E-Print Network (OSTI)

How should the WECCs RTEP process develop a 10-year transmission plan based upon transmission studies completed over the past several years? This paper explores the notion of a plan that consists of a package containing a small number of contingent plans that would correspond to a limited number of future states of the world by 2020. The rationale for developing transmission plans on a contingent basis is based on the following observations. Contingencies. Insights from TEPPC transmission planning over the past several years indicate that the demand for future transmission expansion in the West is contingent upon a number of important drivers including: (1) Levels of state renewable portfolio standards (RPS); (2) Development of remote versus local renewable generation; (3) Load growth given DSM policies and economic growth; (4) Policies to reduce greenhouse gas (GHG) emissions; (5) Shifts of innovation and cost competitiveness between wind and solar energy; (6) Advances in distributed generation technologies;

unknown authors

2010-01-01T23:59:59.000Z

309

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Approach to Meeting Requirements Examples Approach to Meeting Requirements Examples Example 26 9.2 HEALTH AND SAFETY STRATEGY B Plant has integrated safety into its management, planning and work practices in order to protect the public, the environment and facility workers against nuclear and non-nuclear hazards associated with facility transition. Based upon the principles of DNFSB Recommendation 95-2, the Plant's approach to safety management includes:  Applicable. standards and requirements specifically identified and implemented  Safety integrated into baseline and detailed planning  Workers and trained safety professionals use a team approach in hazard identification, analysis and control  Graded approach used to tailor controls based upon hazard type and severity

310

Community Relations Plan Update  

Office of Legacy Management (LM)

8-TAR 8-TAR MAC-MRAP 1.9.1 Monticello Mill Tailings Superfund Site and Monticello Vicinity Properties Superfund Site Monticello, Utah Community Relations Plan Update FY 2001 Prepared for U.S. Department of Energy Albuquerque Operations Office Grand Junction Office Prepared by MACTEC Environmental Restoration Services, LLC Grand Junction, Colorado Work performed under DOE Contract No. DE-AC13-96GJ87335 for the U.S. Department of Energy For more information or to request additional copies of this document, please call (800) 269-7145 (Utah only) or Monticello Repository Office Complex (435) 587-4000 DOE Grand Junction Office Community Relations Plan Update FY 2001 Page v Table of Contents Terms and Abbreviations........................................................................................................... vii

311

Environmental Restoration Information Resource Management Program Plan  

SciTech Connect

The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

Not Available

1994-09-01T23:59:59.000Z

312

DOE OIG Strategic Plan Fiscal Years 2003-2008 | Department of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About Us...

313

Flight Plan  

E-Print Network (OSTI)

Developing broader linguistic capability and cultural understanding iscritical to prevail in the long war and meet 21 st Century challenges. The Department must dramatically increase the number of personnel proficient in key languagesand make these languages available at all levels of action and decision from the strategic to the tactical. 2006 Quadrennial Defense Review, p. 78 Due to the nature of immediate and likely future challenges, our Joint forces require Airmen capable of influencing the outcomes of US, allied, and coalition operations anywhere in the world. While we, the Air Force, have made considerable initial progress toward building the necessary cross-cultural skills, we recognize the existing processes for obtaining this forceenhancing capability (appropriate culture, region, language and negotiation skills) are not currently mature or robust enough to optimally meet immediate expectations or near-future requirements. Therefore, it is imperative that we tailor our cultural, regional, and language competency development to maximize our efforts and meet Air Force and Joint requirements informed by National guidance. To this end, the Air Force Culture, Region, and Language (CRL) Flight Plan represents our framework for implementing relevant National Security and National Defense strategies via Air Force programs. The dynamic global environment has made Cross-Cultural Competence a critical and necessary capability for the Total Force. The Air Force CRL Flight Plan supports the

unknown authors

2009-01-01T23:59:59.000Z

314

Fuel Cell Technologies Office: Photoelectrochemical Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Photoelectrochemical Working Group Photoelectrochemical Working Group Promising PEC Materials The PEC Working Group invites the international research community to assist in the development of PEC Materials White Papers to track the research status of the most promising materials classes for solar water splitting. The Photoelectrochemical Working Group meets regularly to review technical progress, develop synergies, and collaboratively develop common tools and processes for photoelectrochemical (PEC) water splitting. Its members include principal investigators and supporting personnel from U.S. Department of Energy (DOE)-funded photoelectrochemical projects. More information on planned DOE photoelectrochemical activities can be found in the Multi-Year Research, Development, and Demonstration Plan.

315

Underground Natural Gas Working Storage Capacity - Energy ...  

U.S. Energy Information Administration (EIA)

... Demonstrated maximum working gas volume is the sum of the highest storage inventory levels of working gas observed in each facility over the previous 5-year ...

316

Work Force Restructuring Activities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Force Restructuring Activities Force Restructuring Activities December 10, 2008 Note: Current updates are in bold # Planned Site/Contractor HQ Approved Separations Status General * LM has finalized the compilation of contractor management team separation data for the end of FY07 actuals and end of FY08 and FY09 projections. LM has submitted to Congress the FY 2007 Annual Report on contractor work force restructuring activities. The report has been posted to the LM website. *LM conducted a DOE complex-wide data call to the Field and Operations offices for DOE Contractor Management teams to provide, by program, actual contractor separation data for the end of FY 2008 and projections for the end of FY 2009 and FY 2010. The data will be used to keep senior management informed of upcoming large WFR actions.

317

TEC Working Group Topic Groups Rail Conference Call Summaries...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TEC Working Group Topic Groups Rail Conference Call Summaries CONFERENCE CALL SUMMARIES Rail Topic Group Inspections Subgroup Planning Subgroup Tracking Subgroup TRAGIS Subgroup...

318

Fuel Cell Technologies Office: Photoelectrochemical Working Group  

NLE Websites -- All DOE Office Websites (Extended Search)

About About Printable Version Share this resource Send a link to Fuel Cell Technologies Office: Photoelectrochemical Working Group to someone by E-mail Share Fuel Cell Technologies Office: Photoelectrochemical Working Group on Facebook Tweet about Fuel Cell Technologies Office: Photoelectrochemical Working Group on Twitter Bookmark Fuel Cell Technologies Office: Photoelectrochemical Working Group on Google Bookmark Fuel Cell Technologies Office: Photoelectrochemical Working Group on Delicious Rank Fuel Cell Technologies Office: Photoelectrochemical Working Group on Digg Find More places to share Fuel Cell Technologies Office: Photoelectrochemical Working Group on AddThis.com... Key Activities Plans, Implementation, & Results Accomplishments Organization Chart & Contacts

319

Cogeneration Planning  

E-Print Network (OSTI)

Cogeneration, the sequential use of a fuel to generate electricity and thermal energy, has become a widely discussed concept in energy engineering. American-Standard, a world-wide diversified manufacturing corporation, has actively been pursuing cogeneration projects for its plants. Of concern to us are rapidly escalating electrical costs plus concern about the future of some utilities to maintain reserve capacity. Our review to date revolves around (1) obtaining low-cost reliable fuel supplies for the cogeneration system, (2) identifying high cost/low reserve utilities, and (3) developing systems which are base loaded, and thus cost-effective. This paper will be an up-to-date review of our cogeneration planning process.

Mozzo, M. A. Jr.

1985-05-01T23:59:59.000Z

320

DataONE Example NSF Data Management Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

DataONE Example NSF Data Management Plan www.dataone.org Example Data Management Plan, based on the work of C.D. Keeling and Colleagues, Scripps Institution of Oceanography...

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Underground storage tank 253-D1U1 Closure Plan  

Science Conference Proceedings (OSTI)

This report is a closure plan for a diesel fuel tank at the Lawrence Livermore National Laboratory. Included are maps of the site, work plans, and personnel information regarding training and qualification.

Mancieri, S.; Giuntoli, N.

1993-09-01T23:59:59.000Z

322

Operations Authorization Assessment Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operations Authorization Assessment Plan Operations Authorization Assessment Plan Operations Authorization Assessment Plan Performance Objective: The objective of this assessment is to verify there is documentation in place which accurately describes the safety envelope for a facility, program or project. Criteria: Conditions and requirements should be established to ensure programs addressing all applicable functional areas are adequately implemented to support safe performance of the work. The extent of documentation and level of authority for agreement shall be tailored to the complexity and hazards associated with the work. Personnel shall be responsible and accountable for performance of work in accordance with the controls established. Operations-Authorization.doc More Documents & Publications

323

Chemical Hygiene and Safety Plan  

SciTech Connect

The objective of this Chemical Hygiene and Safety Plan (CHSP) is to provide specific guidance to all LBL employees and contractors who use hazardous chemicals. This Plan, when implemented, fulfills the requirements of both the Federal OSHA Laboratory Standard (29 CFR 1910.1450) for laboratory workers, and the Federal OSHA Hazard Communication Standard (29 CFR 1910.1200) for non-laboratory operations (e.g., shops). It sets forth safety procedures and describes how LBL employees are informed about the potential chemical hazards in their work areas so they can avoid harmful exposures and safeguard their health. Generally, communication of this Plan will occur through training and the Plan will serve as a the framework and reference guide for that training.

Berkner, K.

1992-08-01T23:59:59.000Z

324

TERMS OF REFERENCE FP2020 WORKING GROUP ON COUNTRY ENGAGEMENT A. PURPOSE OF WORKING GROUP  

E-Print Network (OSTI)

The London Summit on Family Planning brought together partners representing country governments, donors, multilateral agencies, civil society and private sector organisations around an ambitious goal: to provide an additional 120 million women in the worlds poorest countries with access to voluntary family planning by 2020. Developing country leaders and other partners made transformative financial, policy and delivery commitments and $2.6bn in donor financing was pledged to enable millions more girls and women to use family planning information, services and supplies. The commitments made at the Summit will support the right of women and girls around the world to decide, freely and for themselves, whether, when and how many children they have. The purpose of the FP2020 Country Engagement Working Group is to work with existing partners to provide additional support to countries as they develop, implement, and monitor progress against their transformational family planning plans, building on existing country plans wherever possible, and within the context of countries wider RMNCH and health sector plans. B. OBJECTIVES OF THE WORKING GROUP The Country Engagement Working Group, recognizes that there are partners on the ground working with governments and other partners in many areas within the TOR of the working group. The primary

unknown authors

2012-01-01T23:59:59.000Z

325

PROJECT MANAGEMENT PLANS Project Management Plans  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MANAGEMENT PLANS MANAGEMENT PLANS Project Management Plans  Overview  Project Management Plan Suggested Outline Subjects  Crosswalk between the Suggested PMP Outline Subjects and a Listing of Project Planning Elements  Elements of Deactivation Project Planning  Examples From Project Management Plans Overview The purpose here is to assist project managers and project planners in creating a project plan by providing examples and pointing to information that have been successfully used by others in the past. Section 4.2 of DOE Guide 430.1-3, DEACTIVATION IMPLEMENTATION GUIDE discusses the content and purpose of deactivation project management plans. It is presented as a suggested outline followed by other potential subjects. For the convenience of readers, that information is repeated below.

326

Combined Operating License Model Program Plan  

Science Conference Proceedings (OSTI)

The Model Program Plan (MPP) provides functional guidance on how to prepare a Combined Operating License (COL) application for a new nuclear power facility when incorporating previous findings from both design certification (DC) and an early site permit (ESP) proceedings. The plan identifies the activities necessary to prepare an application and provides guidance on planning and managing a COL program, including working with DC and ESP holders and using subcontracted resources to develop necessary new in...

2003-11-17T23:59:59.000Z

327

ADP security plan, 320 Building, Room 110  

SciTech Connect

The enclosed document is a draft ADP Security Plan. This plan follows outline provided by DOE Order 5636.2. The outline is in the following format: (1) name of computing system security offices and ADP systems; (2) purpose and operational characteristics; (3) configuration and descriptions of ADP equipment; (4) percentage and level of classified work; (5) description of communication networks; (6) statement of threat; (7) security procedures; (8) contingency plans; and (9) NACSI 5004 evaluation.

Brauer, F.P.

1985-08-27T23:59:59.000Z

328

Peaks, Plans and (Persnickety) Prices  

Reports and Publications (EIA)

This presentation provides information about EIA's estimates of working gas peak storage capacity, and the development of the natural gas storage industry. Natural gas shale and the need for high deliverability storage are identified as key drivers in natural gas storage capacity development. The presentation also provides estimates of planned storage facilities through 2012.

Information Center

2010-10-28T23:59:59.000Z

329

STRATEGIC PLANNING  

E-Print Network (OSTI)

The National Academy of Public Administration is an independent, nonprofit organization chartered by Congress to improve governance at all levelslocal, regional, state, national, and international. The Academys membership of more than 550 Fellows includes current and former members of Congress, cabinet-level appointees, senior federal executives, state and local practitioners, businesspeople, nonprofit leaders, and scholars with distinguished records in public management. Since its establishment in 1967, the Academy has assisted hundreds of federal agencies, congressional committees, state and local governments, civic organizations, and institutions overseas through problemsolving, research, analysis, information sharing, developing strategies for change, and connecting people and ideas. Most reports and papers issued by Academy panels respond to specific requests and needs of public agencies. Projects also address governmentwide and broader societal topics identified by the Academy. In addition to government institutions, the Academy is also supported by businesses, foundations, and nonprofit organizations. A Final Report by a Panel of the NATIONAL ACADEMY OF PUBLIC ADMINISTRATION for the Office of Strategic Planning

Hale Champion; Mary Jane England; Harry Hatry

2001-01-01T23:59:59.000Z

330

Hanford Site Development Plan  

SciTech Connect

The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

1990-01-01T23:59:59.000Z

331

Director of Consolidated Public Works Recording Secretary  

E-Print Network (OSTI)

A three-member board to exercise authority over the planning and design of streets, including the alignment and grade of the street and also the drainage of the contiguous areas. 1910 Board of Survey establishes specifications for street layouts. 1913 Five member Planning Board formed to make studies of resource possibilities and needs of the city. 1914 Membership of Planning Board resigns. 1915 Planning Board reconstructed with five new members. 1921 By City Council Ordinance, the Board of Survey is combined with the Planning Board to form the Board of Survey and Planning consisting of three members and a clerk. The Clerk is to be a city engineer. 1923 By an act of the State Legislature, the Board of Survey is combined with the Planning Board to form the Board of Survey and Planning with a five-member board. The first task is to zone the City. 1924 Board of Survey and Planning officially organized on February 12, 1924. 1933 Board of Survey and Planning voted to recommend to the Slate Department of Public Works that Route 128 be built between Bear Hill and Prospect Hill. 1934 Overpass at Beaver Brook and Main Street Railroad crossing planned by the Board of Survey and Planning. 1946 By City Ordinance, no development shall be accepted unless the developer provides sewer and drainage. 1950 Board of Survey and Planning studies new zoning for the City. 1953 By City Ordinance, all new subdivisions will be required to have water mains and services installed by the developer in its entirety.

S. Anthony Devito; Priscilla Lane; John Tashjian; Janice E. Deveney

1997-01-01T23:59:59.000Z

332

Society for College and University Planning  

E-Print Network (OSTI)

IN DISASTER PLANNING AND RESPONSE: The paper is based on the experiences and advice of presidents and other ROLE IN DISASTER PLANNING AND RESPONSE: LESSONS FROM THE FRONT A major disaster is one of the most leaders who have led their campuses through a disaster -- what worked, what did not, and what they wish

Hickman, Mark

333

Remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 Ponds, Boneyard/Burnyard, Oil Landfarm, Sanitary Landfill 1, and the Burial Grounds, including Oil Retention Ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text  

Science Conference Proceedings (OSTI)

The intent and scope of the work plan are to assemble all data necessary to facilitate selection of remediation alternatives for the sites in Bear Creek Valley Operable Unit 1 (BCV OU 1) such that the risk to human health and the environment is reduced to acceptable levels based on agreements with regulators. The ultimate goal is to develop a final Record Of Decision (ROD) for all of the OUs in BCV, including the integrator OU. However, the initial aim of the source OUs is to develop a ROD for interim measures. For source OUs such as BCV OU 1, data acquisition will not be carried out in a single event, but will be carried out in three stages that accommodate the schedule for developing a ROD for interim measures and the final site-wide ROD. The three stages are as follows: Stage 1, Assemble sufficient data to support decisions such as the need for removal actions, whether to continue with the remedial investigation (RI) process, or whether no further action is required. If the decision is made to continue the RI/FS process, then: Stage 2, Assemble sufficient data to allow for a ROD for interim measures that reduce risks to the human health and the environment. Stage 3, Provide input from the source OU that allows a final ROD to be issued for all OUs in the BCV hydrologic regime. One goal of the RI work plan will be to ensure that sampling operations required for the initial stage are not repeated at later stages. The overall goals of this RI are to define the nature and extent of contamination so that the impact of leachate, surface water runoff, and sediment from the OU I sites on the integrator OU can be evaluated, the risk to human health and the environment can be defined, and the general physical characteristics of the subsurface can be determined such that remedial alternatives can be screened.

Not Available

1993-09-01T23:59:59.000Z

334

LANS DB PENSION PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

December 2010 December 2010 u:\my documents\pension plan\revised tcp1 db plan spd dec 2010.doc LANS Defined Benefit Pension Plan Summary Plan Description This Summary Plan Description (SPD) is intended to provide a summary of the principal features of the LANS Defined Benefit Pension Plan ("Plan") and is not meant to interpret, extend or change the Plan in any way. This SPD will continue to be updated. Please check back on a regular basis for the most recent version. Nothing in the Plan and/or this SPD shall be construed as giving any member the right to be retained in service with LANS or any affiliated company, or as a guarantee of any rights or benefits under the Plan. LANS, in its sole discretion, reserves the right to amend the SPD or Plan, or to terminate the Plan, at any time.

335

ENERGY EMERGENCY RESPONSE PLAN  

E-Print Network (OSTI)

CALIFORNIA ENERGY COMMISSION ENERGY EMERGENCY RESPONSE PLAN COMMISSIONREPORT October 2006 CEC-600 Deputy Director FUELS AND TRANSPORTATION DIVISION #12;The Energy Emergency Response Plan is prepared, safety, and welfare. #12;ACKNOWLEDGEMENTS The Energy Emergency Response Plan was prepared from

336

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network (OSTI)

CHEMICAL HYGIENE PLAN AND HAZARD COMMUNICATION PLAN Occupational Exposures to Hazardous Chemicals Safety 2723 Environmental Health/Safety Chemical Hygiene Officer Radiation Safety Officer Biological (Accident Reports) 2204 Bioengineering 2965 #12;TABLE OF CONTENTS CHEMICAL HYGIENE PLAN (CHP) (4/2007) 1

Oliver, Douglas L.

337

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network (OSTI)

CHEMICAL HYGIENE PLAN AND HAZARD COMMUNICATION PLAN Occupational Exposures to Hazardous Chemicals and Safety Numbers Research Safety 2723 Environmental Health/Safety Chemical Hygiene Officer Radiation Safety Human Resources (Accident Reports) 4589 Bioengineering 2965 #12;TABLE OF CONTENTS CHEMICAL HYGIENE PLAN

Kim, Duck O.

338

1995-1996 Strategic Plan  

SciTech Connect

In a rapidly changing world, effective governmental organizations must anticipate and plan for the future. Nowhere is this more true than in the realm of information generation and dissemination. The Energy Information Administration (EIA) faces a future of great opportunity and also significant challenge. Technological advances are providing opportunities to improve our work processes and the way we serve our customers. This year`s Strategic Plan was developed by an EIA Strategic Planning Group with a membership that spans the entire organization. The Strategic Plan provides both a broad vision and a clear map of EIA`s near-term future. The Strategic Planning Group conducted an analysis of the strengths and weaknesses of EIA as an organization, and of the opportunities and constraints facing EIA in the future. Opportunities exist in the future in technological advances and staff training; constraints lie in federal budget trends and staff demographics. This will require a Strategic Plan that recognizes the need to prioritize services and products across EIA, standardize technology across EIA where possible, lead with fewer layers of management, and be acutely aware of customer needs. Developing and training EIA employees to meet the challenges of rapidly changing technology and decreasing budgets were given high priority.

1995-09-01T23:59:59.000Z

339

Submitted Work & Work in Preparation - CECM  

E-Print Network (OSTI)

May 23, 2001 ... Submitted Work & Work in Preparation. I. G. Lisle and G. J. Reid, Symmetry Classification Using Invariant Moving Frames, to be submitted.

340

Integrated Planning and Performance Management  

NLE Websites -- All DOE Office Websites (Extended Search)

DOESC Scientific Facilities Strategic Plan (20 years, major capital projects) * DOE Strategic Plan (7-10 years) * DOE (HEP)Fermilab Strategic Plan (10 years) * FRAFNAL Plan for...

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Multi-agent coordination by temporal plan fusion: Application to combat search and rescue  

Science Conference Proceedings (OSTI)

Coordination of actions and plans that must be achieved by multiple agents is one of the most difficult tasks in the multi-agent domain. In order to work together and achieve a common goal, agents need to coordinate their plans in a way that guarantees, ... Keywords: Distributed plan monitoring, Multi-agent coordination, Plan fusion, Temporal fusion, Temporal merging, Temporal planning

Mohamad K. Allouche; Abdeslem Boukhtouta

2010-07-01T23:59:59.000Z

342

Environmental Monitoring Plan  

SciTech Connect

The purpose of the environmental monitoring plan (EMP) is to promote the early identification of, and response to, potential adverse environmental impacts associated with DOE operations. Environmental monitoring supports the Integrated Safety Management System (ISMS) to detect, characterize, and respond to releases from DOE activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of the DOE activity. In addition, the EMP addresses the analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of radionuclide samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. Until recently, environmental monitoring at Lawrence Livermore National Laboratory (LLNL) was required by DOE Order 5400.1, which was canceled in January 2003. LLNL is in the process of adopting the ISO 14001 Environmental Management Systems standard, which contains requirements to perform and document environmental monitoring. The ISO 14001 standard is not as prescriptive as DOE Order 5400.1, which expressly required an EMP. LLNL will continue to prepare the EMP because it provides an organizational framework for ensuring that the work is conducted appropriately. The environmental monitoring addressed by the plan includes preoperational characterization and assessment, and effluent and surveillance monitoring. Additional environmental monitoring is conducted at LLNL as part of the compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). This EMP does not address the technical requirements for such monitoring.

Althouse, P E; Bertoldo, N A; Bowen, B M; Brown, R A; Campbell, C G; Christofferson, E; Gallegos, G M; Grayson, A R; Jones, H E; Larson, J M; Laycak, D; Mathews, S; Peterson, S R; Revelli, M J; Rueppel, D; Williams, R A; Wilson, K; Woods, N

2005-11-23T23:59:59.000Z

343

Acquisition Plan Strategy and Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 01 ACQUISITION PLAN STRATEGY AND GUIDANCE NOTE: The process provided below is not intended to replace an agency's acquisition planning requirements. INSTRUCTIONS 1. Work with your DOE Federal Finance Specialist to determine whether a "pay from savings" project is feasible. a. Determine if appropriated dollars are available to offset some of the costs. b. Consider alternative finance options: Energy Savings Performance Contract (ESPC), Utility Energy Service Contract (UESC), Power Purchase Agreement (PPA), or Enhanced Use Lease (EUL) Scott Wolf 6848 Cooper Point Road NW Olympia, WA 98502 Phone: 360-866-9163 Fax: 360-866-9683 scott.wolf@ee.doe.gov Serving Montana, Wyoming, Utah, Colorado, Nebraska, New Mexico,

344

Audit of Groundwater Remediation Plans at Savannah River, ER...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Ombudsman FOIA Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work...

345

DOE Announces Plans for WIPP | National Nuclear Security Administratio...  

National Nuclear Security Administration (NNSA)

NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > DOE Announces Plans for WIPP DOE Announces...

346

UCSD Support for Fusion Simulation Project Planning Activity  

Science Conference Proceedings (OSTI)

This document is a close-out report on work performed by UCSD researchers in support of the Fusion Simulation Project Planning Activity.

Holland, C.; Tynan, G. R.; Diamond, P. H.

2011-11-03T23:59:59.000Z

347

Shift Work and Potential Health Effects  

Science Conference Proceedings (OSTI)

The objective of this report is to inform the electric power industry of current scientific knowledge on worker health and safety risks associated with shift work in order to support future research planning. Shift work has been found to be associated with increased cancer risks8212primarily of breast cancer and (to a lesser extent) prostate and colon cancer. Risk of occupational injuries increases with several common characteristics of shift work8212particularly rotating shifts and longer shift lengths....

2011-10-31T23:59:59.000Z

348

Working Group Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

5 5 Working Group Reports Special Working Session on the Role of Buoy Observations in the Tropical Western Pacific Measurement Scheme J. Downing Marine Sciences Laboratory Sequim, Washington R. M. Reynolds Brookhaven National Laboratory Upton, New York Attending W. Clements (TWPPO) F. Barnes (TWPPO) T. Ackerman (TWP Site Scientist) M. Ivey (ARCS Manager) H. Church J. Curry J. del Corral B. DeRoos S. Kinne J. Mather J. Michalsky M. Miller P. Minnett B. Porch J. Sheaffer P. Webster M. Wesely K. Zorika G. Zhang Focus of Discussion The session convened on March 2, with brief introductions by Bill Clements. The purpose of the session was to discuss the scientific merits of retrofitting TOGA/TAO buoys with shortwave radiometers. Three questions were posed at the outset of the session to focus the discussion.

349

Retirement Plan | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Retirement Plan | National Nuclear Security Administration Retirement Plan | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Retirement Plan Home > Federal Employment > Working at NNSA > Benefits > Retirement Plan Retirement Plan The great jobs we have at NNSA also come with comprehensive benefits packages. They are among the best and most comprehensive available and play

350

Sanitary Sewer System Management Plan  

E-Print Network (OSTI)

Indicators PMT Plant Maintenance Technician POSM Pipeline Observation System Management POTW Publicly OwnedSanitary Sewer System Management Plan Prepared by: Environment, Health and Safety Division to enforce any violation iii-10 Section iv: Operation and Maintenance Program iv iv-a: System mapping iv-2 iv

351

ClimateWorks Low Carbon Growth Planning Support | Open Energy...  

Open Energy Info (EERE)

Brazil, China, Democratic Republic of Congo, Egypt, Ethiopia, Guyana, India, Indonesia, Kenya, Malaysia, Mexico, Papua New Guinea South America, Eastern Asia, Middle Africa,...

352

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

file. 4.3 Field Sample Custody 4.3.1 Sampling personnel, upon collection of samples for analysis, will properly complete a COC Record (Attachment 6.1). The COC document will be...

353

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Memorandum of Agreement Memorandum of Agreement This page intentionally left blank 1 MEMORANDUM OF AGREEMENT BETWEEN THE UNITED STATES DEPARTMENT OF ENERGY AND THE REGENTS OF THE UNIVERSITY OF CALIFORNIA REGARDING THE INVESTIGATION, REMEDIATION, LONG-TERM SURVEILLANCE, MAINTENANCE, AND CONTINGENT REMEDIATION OF THE LABORATORY FOR ENERGY-RELATED HEALTH RESEARCH AT THE UNIVERSITY OF CALIFORNIA, DAVIS INTRODUCTION Whereas, the United States Department of Energy ("DOE") and The Regents of the University of California ("the University") (referred to collectively as "the Parties") entered into Contract DE-AC03-76SF00472 ("the Contract") for the operation of the Laboratory for Energy-Related Health Research ("LEHR"); and

354

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

Standard Operating Procedures and Standard Quality Procedures Standard Operating Procedures and Standard Quality Procedures This page intentionally left blank U.S. Department of Energy Oakland Operations Office, Oakland, California FINAL STANDARD OPERATING PROCEDURES for the: Environmental Restoration/Waste Management Laboratory for Energy-Related Health Research (LEHR) University of California at Davis, California Prepared for: United States Department of Energy Oakland Operations Office 1301 Clay Street Oakland, California 95612-5208 Prepared by: Weiss Associates 5801 Christie Avenue, Suite 600 Emeryville, CA 94608-1827 DOE Oakland Operations Contract DE-AC03-96SF20686 J:\DOE\4000\D3\SQ&OPS\WASOPS\SOP_TOC1299.DOC WEISS ASSOCIATES Project Number: 128-4000 FINAL STANDARD OPERATING PROCEDURES

355

Presentation to the EAC - Smart Grid Subcommittee Work Plan Status...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

billion with cost share to be spent through 2015 338 - 476 billion needed through 2030 880 billion needed throug h 2030 Chupka, M.W. Earle, R., Fox-Penner, P., Hledik, R....

356

Site Visit Report - Independent Oversight Review of Work Planning...  

NLE Websites -- All DOE Office Websites (Extended Search)

Safety and Security (HSS) in support of the Department of Energy Office of Environmental Management (EM). The purpose of the review was to support EM management efforts to...

357

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

of the LEHR Facility. Neither the fact of execution of this Agreement nor any of the terms of this Agreement is or shall be construed as an admission of liability or fact by the...

358

Microsoft Word - s05822_LEHR_WorkPlan  

Office of Legacy Management (LM)

and hydrogeologist. Well development will be considered complete when the water is free of sediment; when specific conductance (SC), pH, and temperature are within the...

359

Thift Savings Plan (TSP) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Thift Savings Plan (TSP) Thift Savings Plan (TSP) Thift Savings Plan (TSP) TSP is a retirement savings and investment plan for Federal employees and members of the uniformed services, including the Ready Reserve. It was established by Congress in the Federal Employees' Retirement System Act of 1986 and offers the same types of savings and tax benefits that many private corporations offer their employees under 401(k) plans. TSP is a defined contribution plan, meaning that the retirement income you receive from your TSP account will depend on how much you (and your agency, if you are eligible to receive agency contributions) put into your account during your working years and the earnings accumulated over that time. TSP and Life Events Throughout your life you will encounter circumstances that may influence

360

Baruch Plan Presented | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Baruch Plan Presented | National Nuclear Security Administration Baruch Plan Presented | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > Baruch Plan Presented Baruch Plan Presented June 14, 1946 New York, NY Baruch Plan Presented Bernard Baruch presents the American plan for international control of

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

ESnet Program Plan 1994  

Science Conference Proceedings (OSTI)

This Program Plan characterizes ESnet with respect to the current and future needs of Energy Research programs for network infrastructure, services, and development. In doing so, this document articulates the vision and recommendations of the ESnet Steering Committee regarding ESnet`s development and its support of computer networking facilities and associated user services. To afford the reader a perspective from which to evaluate the ever-increasing utility of networking to the Energy Research community, we have also provided a historical overview of Energy Research networking. Networking has become an integral part of the work of DOE principal investigators, and this document is intended to assist the Office of Scientific Computing in ESnet program planning and management, including prioritization and funding. In particular, we identify the new directions that ESnet`s development and implementation will take over the course of the next several years. Our basic goal is to ensure that the networking requirements of the respective scientific programs within Energy Research are addressed fairly. The proliferation of regional networks and additional network-related initiatives by other Federal agencies is changing the process by which we plan our own efforts to serve the DOE community. ESnet provides the Energy Research community with access to many other peer-level networks and to a multitude of other interconnected network facilities. ESnet`s connectivity and relationship to these other networks and facilities are also described in this document. Major Office of Energy Research programs are managed and coordinated by the Office of Basic Energy Sciences, the Office of High Energy and Nuclear Physics, the Office of Magnetic Fusion Energy, the Office of Scientific Computing, and the Office of Health and Environmental Research. Summaries of these programs are presented, along with their functional and technical requirements for wide-area networking.

Merola, S.

1994-11-01T23:59:59.000Z

362

Human Factors Review Plan  

SciTech Connect

''Human Factors'' is concerned with the incorporation of human user considerations into a system in order to maximize human reliability and reduce errors. This Review Plan is intended to assist in the assessment of human factors conditions in existing DOE facilities. In addition to specifying assessment methodologies, the plan describes techniques for improving conditions which are found to not adequately support reliable human performance. The following topics are addressed: (1) selection of areas for review describes techniques for needs assessment to assist in selecting and prioritizing areas for review; (2) human factors engineering review is concerned with optimizing the interfaces between people and equipment and people and their work environment; (3) procedures review evaluates completeness and accuracy of procedures, as well as their usability and management; (4) organizational interface review is concerned with communication and coordination between all levels of an organization; and (5) training review evaluates training program criteria such as those involving: trainee selection, qualification of training staff, content and conduct of training, requalification training, and program management.

Paramore, B.; Peterson, L.R. (eds.)

1985-12-01T23:59:59.000Z

363

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

SEPTEMBER 2013 SEPTEMBER 2013 CARBON STORAGE U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any

364

PROJECT MANGEMENT PLAN EXAMPLES  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Development of Detailed End Points - Development of Detailed End Points - End Point Document Examples Example 28 7.0 ENDPOINTS Chapter 7.0 describes the endpoint development principles and methodology, administration, closure, and turnover package for the 324 and 327 Buildings Stabilization/Deactivation Project. 7.1 Background The endpoint method for the 324 and 327 Buildings Stabilization/Deactivation Project will follow the EM-60 guidance, published in DOE/EM-0318, Rev. 0, U.S. Department of Energy, Office of Environmental Management Facility Deactivation, Methods and Practice Handbook, Emphasizing End Points (sic) Implementation . The methods of defining endpoints for facility stabilization and deactivation were proven extremely effective at the PUREX and B-Plant facilities for planning work and interacting with the

365

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

COMBUSTION SYSTEMS COMBUSTION SYSTEMS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREfACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any

366

TECHNOLOGY PROGRAM PLAN  

NLE Websites -- All DOE Office Websites (Extended Search)

SOLID OXIDE FUEL CELLS SOLID OXIDE FUEL CELLS U.S. DEPARTMENT OF ENERGY TECHNOLOGY PROGRAM PLAN PREFACE ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference therein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any

367

Environmental Monitoring Plan  

SciTech Connect

Environmental monitoring personnel from Lawrence Livermore National Laboratory (LLNL) prepared this ''Environmental Monitoring Plan'' (EMP) to meet the requirements in the U.S. Department of Energy (DOE) ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' (DOE 1991) and applicable portions of DOE Orders 5400.1 and 5400.5 (see WSS B93 and B94 in Appendix B). ''Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance'' is followed as a best management practice; under Work Smart Standards, LLNL complies with portions of DOE Orders 5400.1 and 5400.5 as shown in Appendix B. This document is a revision of the May 1999 EMP (Tate et al. 1999) and is current as of March 1, 2002. LLNL is one of the nation's premier applied-science national security laboratories. Its primary mission is to ensure that the nation's nuclear weapons remain safe, secure, and reliable, and to prevent the spread and use of nuclear weapons worldwide. LLNL's programs in advanced technologies, energy, environment, biosciences, and basic science apply LLNL's unique capabilities and enhance the competencies needed for this national security mission. LLNL's mission also involves working with industrial and academic partners to increase national competitiveness and improve science education. LLNL's mission is dynamic and has changed over the years to meet new national needs. In keeping with the Laboratory's mission, the environment, safety, and health (ES&H) have top priority. LLNL's policy is to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage. The environment, safety, and health are to be priority considerations in the planning and execution of all work activities at the Laboratory (LLNL 2001). Furthermore, it is the policy of LLNL to comply with applicable ES&H laws, regulations, and requirements. Under Contract 48, Appendix F, the Laboratory commits to minimizing its waste streams and to avoiding adverse impacts to the environment from its operations (UC/DOE 2001).

Althouse, P E; Biermann, A; Brigdon, S L; Brown, R A; Campbell, C G; Christofferson, E; Clark, L M; Folks, K J; Gallegos, G M; Gouveia, F J; Grayson, A; Harrach, R J; Hoppes, W G; Jones, H; Mathews, S; Merrigan, J R; Peterson, S R; Revelli, M; Rueppel, D; Sanchez, L; Tate, P J; Vellinger, R J; Ward, B; Williams, R

2006-01-10T23:59:59.000Z

368

Protocols from perceptual observations  

Science Conference Proceedings (OSTI)

This paper presents a cognitive vision system capable of autonomously learning protocols from perceptual observations of dynamic scenes. The work is motivated by the aim of creating a synthetic agent that can observe a scene containing interactions between ... Keywords: Autonomous learning, Cognitive vision, Inductive logic programming, Spatio-temporal reasoning, Symbol grounding, Unsupervised clustering

Chris J. Needham; Paulo E. Santos; Derek R. Magee; Vincent Devin; David C. Hogg; Anthony G. Cohn

2005-09-01T23:59:59.000Z

369

BNL | Center for Functional Nanomaterials Operations Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Basic Rules Everyone Must Know Basic Rules Everyone Must Know Work Planning All work must be planned and reviewed for safety. Experimental Safety Reviews (ESRs), Safety Approval Forms (SAFs), and Work Permits are the documents used at the CFN. Make sure your project is reviewed and approved before you begin your work and that you follow all rules, regulations, and postings. Changes in procedures need to be approved before work commences. All individuals performing work at BNL are required to obtain a guest or permanent appointment before beginning work. You must wear your badge/ID at all times. Radioactive materials, chemicals, and equipment may not be brought into the Department without prior notification. Shipping ANY sample from BNL needs to be done through the shipping desk located in B98. Any radioactive material must be evaluated by the

370

Work Force Retention Work Group Charter  

Energy.gov (U.S. Department of Energy (DOE))

The Work force Retention Work Group is established to support the Departments critical focus on maintaining a high-performing work force at a time when a significant number of the workers needed to support DOEs national security mission are reaching retirement age.

371

Building Technologies Program Planning Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Building Technologies Program Planning Summary Building Technologies Program Planning Summary Introduction The U.S. Department of Energy's (DOE) Building Technologies Program (BTP) works in partnership with industry, state, municipal, and other federal organizations to achieve the goals of marketable net-zero energy buildings. Such buildings are extremely energy efficient, ideally producing as much energy as they use over the course of a year. BTP also works with stakeholders and federal partners to meet any remaining energy needs for their buildings through on-site renewable energy systems. Drivers Population growth and economic expansion, along with an accompanying increase in energy demand, are expected to drive energy consumption in buildings to more than 50 quadrillion Btu (quads)

372

Ice-making heat exchanger evaluation and test plan  

DOE Green Energy (OSTI)

Several approaches to making ice for district cooling are identified and their current status discussed. Recommendations for future work are given, with a detailed plan for one phase of the work. 13 refs., 5 figs.

Andrews, J.W.; Leigh, R.W.; Piraino, M.W.

1990-01-01T23:59:59.000Z

373

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Metrics Examples Metrics Examples Example 42 5.1.4 Performance Measurement and Reporting The subproject manager will communicate subproject technical issues and accomplishments, schedule performance, cost and schedule issues, and corrective action plans, as appropriate, in the Project Directors' weekly 'Path Forward' meeting. However, the primary performance measurement for reporting subproject performance is provided by the performance measurement system. Within the new common database containing core information on Project Hanford, called HANDI 2000, the performance measurement system compares the resource-loaded schedules (budgeted cost of work scheduled [BCWS]), the actual cost of work

374

Live Working Resource Center  

Science Conference Proceedings (OSTI)

This report is a summary of work performed in 2008 on the EPRI Live Working Resource Center (LWRC) web site.

2008-12-16T23:59:59.000Z

375

PROJECT MANGEMENT PLAN EXAMPLES Prepare Project Support Plans and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Work Management Examples Work Management Examples Example 36 8.2.5 Work Processes Work associated with nuclear safety functions will be planned, authorized, and performed following approved technical standards, instructions, procedures, and other control documentation commensurate with the complexity and risk posed by the task. The calibration program governs the process that ensures quality of the calibration and maintenance of process monitoring equipment. Equipment found to be out of calibration is tagged and not used until re-calibrated. HNF-PRO that implement DOE-Order 5480.19, and HNF-PRO-233, -298, and others determined applicable, will be evaluated and necessary facility specific procedures developed to complement them for implementation. 10.2 Personnel Safety

376

Plan - Data Management  

NLE Websites -- All DOE Office Websites (Extended Search)

Plan Plan Data Management for Data Providers Click an arrow to follow the data management path of a data set from planning to curation. plan Overview plan Plan manage Manage archive Archive curation DAAC Curation Data Management Overview Plan Manage Archive DAAC Curation Related Links DAAC Help Best Practices PDF Workshops DataONE ESIP Data Management Plans NASA's Terrestrial Ecology Program now requires that each proposal include a Data Management Plan (DMP) of up to two pages. A DMP for a proposal is a brief document that outlines what you will do with your data during and after your research, to ensure your data will be safe, documented, and accessible now and in the future. A DMP - developed early and used throughout the research project - will increase research efficiency by making the data understandable and usable in the future and

377

Guidance for Planning Exercises  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for Planning, Conducting and Evaluating for Planning, Conducting and Evaluating Transportation Emergency Preparedness Tabletops, Drills and Exercises Prepared for the Department of Energy Office of Transportation and Emergency Management 02B00215-10.p65 This page intentionally left blank table of contents Transportation Emergency Preparedness Program (TEPP) planning tools planning tools Guidance f Guidance f Guidance f Guidance f Guidance for Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Ev or Planning, Conducting and Evaluating aluating aluating aluating aluating T T T T Tr r r r ransportation Emer ansportation Emer ansportation Emer ansportation Emer ansportation Emergenc genc genc genc gency Pr y Pr y Pr y Pr y Prepar epar epar epar eparedness T

378

CHEMICAL HYGIENE PLAN HAZARD COMMUNICATION PLAN  

E-Print Network (OSTI)

CHEMICAL HYGIENE PLAN AND HAZARD COMMUNICATION PLAN Occupational Exposures to Hazardous Chemicals and Safety Numbers Research Safety 2723 Environmental Health/Safety Chemical Hygiene Officer Radiation Safety Human Resources (Accident Reports) 4589 Clinical Engineering 2964 #12;TABLE OF CONTENTS CHEMICAL HYGIENE

Oliver, Douglas L.

379

Microsoft Word - prjct planning  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Planning Checklist Planning Checklist The following checklist is intended to provide system owners, project managers, and other information system development and maintenance professionals with guidance in identifying and preparing project planning activities. The checklist reflects recognized project planning activities to be performed throughout the information systems project life cycle. Project planning is generally characterized as a process for selecting the strategies, policies, programs, and procedures for achieving the objectives and goals of the project. The objectives of project planning for information systems projects are summarized as the following: C User's environment is analyzed. C Project objectives and scope are defined. C High-level functional requirements are estimated.

380

Peak Underground Working Natural Gas Storage Capacity  

Gasoline and Diesel Fuel Update (EIA)

Note: 1) 'Demonstrated Peak Working Gas Capacity' is the sum of the highest storage inventory level of working gas observed in each facility over the prior 5-year period as...

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Make Observations  

NLE Websites -- All DOE Office Websites (Extended Search)

and public perceptions and preferences, help improve our understanding of risk, vulnerability, resilience, and adaptive capacity. How does USGCRP make observations? USGCRP...

382

Observations - CECM  

E-Print Network (OSTI)

May 10, 1999 ... A broad range of observations were made, culled from the various sources mentioned. Those bearing directly on the participatory process are...

383

Wellness Planning Session Report  

E-Print Network (OSTI)

Wellness Planning Session Report September 12, 2008 #12;Wellness Planning Session Report Printed.............................................................................1 Explored what wellness program should look like at NMSU .......................2 Considered for the Wellness committee..................................2 Identified the next meeting date and meeting agenda

Castillo, Steven P.

384

Strategic Planning History  

NLE Websites -- All DOE Office Websites (Extended Search)

Strategy for Global Change Research Related Federal Climate Efforts Strategic Planning History Print E-mail Below is a timeline of past strategic plans that have guided The U.S....

385

Decommissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE))

The Decommissioning Plan Review (DPR) Module is a tool that assists DOE federal project review teams in evaluating the adequacy of the decommissioning plan prior to approval of the associated CD.

386

Business Continuity Planning  

Science Conference Proceedings (OSTI)

This article considers various strategies for protecting an organisation from both natural and man-made disasters. The differences between business continuity planning, and disaster recovery planning are recognised. 1997 John Wiley & Sons, ...

Martin Nemzow

1997-07-01T23:59:59.000Z

387

Hydrogen Posture Plan  

Fuel Cell Technologies Publication and Product Library (EERE)

The Hydrogen Posture Plan, published in December 2006, outlines a coordinated plan for activities under the Hydrogen Fuel Initiative, both at the Department of Energy and the Department of Transportat

388

RM Capital Investment Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Capital Investment Plans FY 2004 (568kb pdf) FY 2005 (625kb pdf) FY 2006 (625kb pdf) FY 2007 (1.45mb pdf) Meter policy Capital Investment Plans...

389

President Obama Announces His Climate Action Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

President Obama Announces His Climate Action Plan Print E-mail President Obama Announces His Climate Action Plan Print E-mail President Obama Announces His Climate Action Plan Monday, July 1, 2013 On Tuesday, June 25, in a speech at Georgetown University, President Obama announced his comprehensive plan for steady, responsible action to cut carbon pollution, prepare the Nation for the impacts of climate change, and lead international efforts to address climate change as a global challenge. The Plan builds on significant progress made during the Administration's first term on all of these fronts, including those based on the ongoing scientific work of USGCRP's 13 member-agencies, the Interagency Climate Change Adaptation Task Force in which USGCRP participates, and USGCRP's National Climate Assessment team.

390

Plans, Implementation and Results | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Plans, Implementation and Results Plans, Implementation and Results Plans, Implementation and Results The Office of Energy Efficiency and Renewable Energy (EERE) works to strengthen the United States' energy security, environmental quality, and economic vitality in public-private partnerships. It supports this goal through (1) enhancing energy efficiency and productivity; and (2) bringing clean, reliable and affordable energy technologies to the marketplace. This area of the EERE website provides direct links to hundreds of pages and documents that collectively demonstrate and explain: How EERE and its programs make their plans How they implement, control and adjust these plans, and The technological, commercial and other outputs and outcomes that result from the public funds appropriated to the Office and its programs

391

Environmental Restoration Program Records Management Plan  

SciTech Connect

This document describes the plans, organization, and control systems to be used for management of the Hanford Site Environmental Restoration (ER) Program. The Field Office Management Plan (FOMP), in conjunction with the Environmental Restoration Program Quality Assurance System Requireme ts for the Hanford Site (QASR [DOE-RL 1992a]), provides requirements governing ER Program work activities on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (WHC) ER Program Office has developed this ER Program Records Management Plan to fulfill the requirements of the FOMP (DOE-RL 1989). This records management plan will enable the ER Program Office and other ER Program participants to identify, control, and maintain the records generated and used in support of the ER Program.

Montgomery, L.M.

1992-12-01T23:59:59.000Z

392

Assigning multiple activities to work shifts  

Science Conference Proceedings (OSTI)

In some companies such as large retail stores, the employees perform different activities (e.g., cashier or clerk in a specific department) to respond to a customer demand for each activity that varies over the planning horizon and must be fulfilled ... Keywords: Activity assignment, Column generation, Multi-commodity network flow model, Rolling horizon, Work shifts

Quentin Lequy; Mathieu Bouchard; Guy Desaulniers; Franois Soumis; Beyime Tachefine

2012-04-01T23:59:59.000Z

393

Draft 2013 Annual Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft 2013 Annual Plan Draft 2013 Annual Plan Section 999: Draft 2013 Annual Plan Section 999 - Draft 2013 Annual Plan...

394

Integrated formal operations plan  

SciTech Connect

The concept of formal operations (that is, a collection of business practices to assure effective, accountable operations) has vexed the Laboratory for many years. To date most attempts at developing such programs have been based upon rigid, compliance-based interpretations of a veritable mountain of Department of Energy (DOE) orders, directives, notices, and standards. These DOE dictates seldom take the broad view but focus on highly specialized programs isolated from the overall context of formal operations. The result is a confusing array of specific, and often contradictory, requirements that produce a patchwork of overlapping niche programs. This unnecessary duplication wastes precious resources, dramatically increases the complexity of our work processes, and communicates a sense of confusion to our customers and regulators. Coupled with the artificial divisions that have historically existed among the Laboratory`s formal operations organizations (quality assurance, configuration management, records management, training, etc.), this approach has produced layers of increasingly vague and complex formal operations plans, each of which interprets its parent and adds additional requirements of its own. Organizational gridlock ensues whenever an activity attempts to implement these bureaucratic monstrosities. The integrated formal operations plan presented is to establish a set of requirements that must be met by an integrated formal operations program, assign responsibilities for implementation and operation of the program, and specify criteria against which the performance of the program will be measured. The accountable line manager specifies the items, processes, and information (the controlled elements) to which the formal operations program specified applies. The formal operations program is implemented using a graded approach based on the level of importance of the various controlled elements and the scope of the activities in which they are involved.

Cort, G.; Dearholt, W.; Donahue, S.; Frank, J.; Perkins, B.; Tyler, R.; Wrye, J.

1994-01-05T23:59:59.000Z

395

TRU TeamWorks  

NLE Websites -- All DOE Office Websites (Extended Search)

, 2004 , 2004 By the Numbers WIPP marks five-year anniversary Shipments scheduled to arrive at WIPP for the week of 4/4/04 - 4/10/04: 18 Total shipments received at WIPP: 2,456 Total volume disposed at WIPP: 19,042 m 3 FY04 Performance Metrics D E P A R T M E N T O F E N E R G Y U N I T E D S T A T ES O F A M E R I C A TeamWorks TeamWorks TRU A weekly e-newsletter for the Waste Isolation Pilot Plant team For those who endured the early morning cold of March 26, 1999, to witness WIPP's first shipment, it may seem like yesterday. Yet Friday marked five years of WIPP operations. Relative newcomer to WIPP - but not to the waste management industry - CBFO Deputy Manager Lloyd Piper observed, "The transformation from a facility in "standby" mode to operational mode has been nothing short of amazing."

396

HR Fundamentals Retirement Plans  

E-Print Network (OSTI)

FY 12-13 #12;Professional & Faculty Retirement · TIAA/CREF · Defined Contribution Retirement Plan 401 & State Taxes are deferred · Immediate Vesting · www.tiaa-cref.org (800) 842-2776 FY 12-13 #12;TIAA - Public Employee's Retirement System "Defined Contribution Plan" 3) TIAA/CREF ­ Defined Contribution Plan

Dyer, Bill

397

Sandia Strategic Plan 1997  

SciTech Connect

Sandia embarked on its first exercise in corporate strategic planning during the winter of 1989. The results of that effort were disseminated with the publication of Strategic Plan 1990. Four years later Sandia conducted their second major planning effort and published Strategic Plan 1994. Sandia`s 1994 planning effort linked very clearly to the Department of Energy`s first strategic plan, Fueling a Competitive Economy. It benefited as well from the leadership of Lockheed Martin Corporation, the management and operating contractor. Lockheed Martin`s corporate success is founded on visionary strategic planning and annual operational planning driven by customer requirements and technology opportunities. In 1996 Sandia conducted another major planning effort that resulted in the development of eight long-term Strategic Objectives. Strategic Plan 1997 differs from its predecessors in that the robust elements of previous efforts have been integrated into one comprehensive body. The changes implemented so far have helped establish a living strategic plan with a stronger business focus and with clear deployment throughout Sandia. The concept of a personal line of sight for all employees to this strategic plan and its objectives, goals, and annual milestones is becoming a reality.

1997-12-01T23:59:59.000Z

398

Conversion Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Conversion Plan Conversion Plan This template is used to document the conversion plan that clearly defines the system or project's conversion procedures; outlines the installation...

399

Institutional Plan FY 2003 - 2007  

E-Print Network (OSTI)

III. LABORATORY STRATEGIC PLAN DOE Program Focus on ResultsInstitutional Plan addresses the strategic goals of DOE andbelow does not support those elements of the strategic plan

Chartock, Michael; Hansen, Todd

2002-01-01T23:59:59.000Z

400

Strategic Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sites Power Marketing Administration Other Agencies You are here Home About Us Strategic Plan Strategic Plan Leadership Budget Our Organization Strategic Plan Careers Our...

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Training Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Training Plan Training Plan This template is used to define the plan, scope, environment, roles and responsibilities for training needs for systemsoftware development and...

402

ORISE: Work for Others  

NLE Websites -- All DOE Office Websites (Extended Search)

Institute for Science Education Work for Others The U.S. Department of Energy's (DOE) Work for Others (WFO) program allows the performance of work for non-DOE entities when the...

403

Climate Action Plan (Pennsylvania) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Climate Action Plan (Pennsylvania) Climate Action Plan (Pennsylvania) Climate Action Plan (Pennsylvania) < Back Eligibility Agricultural Commercial Construction Fed. Government Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Low-Income Residential Multi-Family Residential Municipal/Public Utility Nonprofit Residential Retail Supplier Rural Electric Cooperative Schools State/Provincial Govt Systems Integrator Transportation Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Pennsylvania Program Type Climate Policies Provider Department of Environmental Protection The Office of Pollution Prevention and Energy Assistance works with

404

Planning for Emergencies | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

for Emergencies | National Nuclear Security Administration for Emergencies | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog The National Nuclear Security Administration Planning for Emergencies Home > About Us > Our Programs > Emergency Response > Planning for Emergencies Planning for Emergencies Emergency Management is the application of the necessary resources to

405

Remedial action planning for Trench 1  

SciTech Connect

The accelerated action to remove the depleted uranium chips and associated soils and wastes from Trench 1 at the Rocky Flats Environmental Technology Site (RFETS) will begin in June 1998. To ensure that the remedial action is conducted safely, a rigorous and disciplined planning process was followed that incorporates the principles of Integrated Safety Management and Enhanced Work Planning. Critical to the success of the planning was early involvement of project staff (salaried and hourly) and associated technical support groups and disciplines. Feedback was and will continue to be solicited, and lessons learned incorporated to ensure the safe remediation of this site.

Primrose, A.; Sproles, W.; Burmeister, M.; Wagner, R.; Law, J. [Rocky Mountain Remediation Services, LLC, Golden, CO (United States). Rocky Flats Environmental Technology Site; Greengard, T. [Kaiser Hill/SAIC, Golden, CO (United States). Rocky Flats Environmental Technology Site; Castaneda, N. [Dept. of Energy, Golden, CO (United States). Rocky Flats Environmental Technology Site

1998-07-01T23:59:59.000Z

406

Project Execution Plan, Rev. 3  

Science Conference Proceedings (OSTI)

This plan addresses project activities encompassed by the U.S. Department of Energy's (DOE's), National Nuclear Security Administration Nevada Operations Office, Environmental Restoration Division and conforms to the requirements contained in the Life-Cycle Asset Management, DOE Order 430.1A; The Joint Program Office Policy on Project Management in Support of DOE Order 430.1; Program and Project Management for the Acquisition of Capital Assets, DOE Order 413.3; the Project Execution and Engineering Management Planning Guide, GPG-FM-010; and other applicable Good Practice Guides; and the FY 2001 Integrated Planning, Accountability, and Budgeting System Policy Guidance. The plan also reflects the milestone philosophies of the Federal Facility Agreement and Consent Order, as agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense; and traditional project management philosophies such as the development of life-cycle costs, schedules, and work scope; identification o f roles and responsibilities; and baseline management and controls.

IT Corporation, Las Vegas

2002-08-01T23:59:59.000Z

407

CORONAL OBSERVATIONS OF CMEs Report of Working ... - Springer  

Science Conference Proceedings (OSTI)

Apr 15, 2002 ... and is associated with a gradual hard X-ray burst (Frost, 1974). ..... field, solar energetic particles, as well as the hard X-ray and Gamma-ray...

408

Some Observations of Hot Working Behavior of Superalloys ...  

Science Conference Proceedings (OSTI)

analysis of the states of stress and strain in a complex deformation process, one must ... gage dimension under load ..... specimens are heated in an electrical ...... Some Typical. Hot Workability. Profiles for A-286 (Gleeble at 20/set). G-32...

409

Tank waste remediation system configuration management plan  

SciTech Connect

The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents.

Vann, J.M.

1998-01-08T23:59:59.000Z

410

Appendix A - Statement of Work  

NLE Websites -- All DOE Office Websites (Extended Search)

o Cyber Security Plan ATTACHMENT 1- RFP RHB-3-23115 - 2 - o Construction Safety and Health Plan o Project Completion Criteria o Project Transition to Operations Plan o...

411

Categorical Exclusion for Maintenance Work  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Maintenance Work Maintenance Work along the Electrical District 5 to Saguaro segment (41/4 to 58/5) of the Maricopa-Saguaro 115-kV Transmission Line, between Friendly Comers and Marana, Pinal County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western plans to conduct maintenance work to maintain or improve the reliability and safety of electrical transmission along 17 miles of the Test Track (formerly Maricopa)-Saguaro 115-kV Transmission Line between Electrical District 5 and Saguaro Steam Plant Substations. The work includes replacing wood poles, cross arms, and knee braces in-kind at 27 structures (41/4-8, 4214, 43/6, 4417, 45/4,46/6,47/2,49/2,49/6,50/2,50/6,50/8,51/4, 52/3, 54/3, 5517, 56/1 57/1-3, 57/8 & 58/2-3), because the wood poles failed stability tests, cross arms are beyond

412

Operating plan FY 1998  

SciTech Connect

This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

1997-10-01T23:59:59.000Z

413

Reliabilit PlanningReliability Planning David Duebner, Expansion Planningp g  

E-Print Network (OSTI)

EE552 Reliabilit PlanningReliability Planning David Duebner, Expansion Planningp g September 27, 2010 #12;Reliability Planning OverviewReliability Planning Overview · Midwest ISO Transmission Expansion Plan (MTEP)p ( ) · MTEP Reliability Study Process ­ Planning Criteriag ­ Reliability Analysis

McCalley, James D.

414

Live Working Resource Center  

Science Conference Proceedings (OSTI)

EPRI created the Live Working Resource Center web site to provide utilities the critical information they need to conduct live work safely and efficiently. This report is a summary of work performed in 2007 on the web site. See EPRI's Live Working Resource Center.

2007-11-30T23:59:59.000Z

415

Scientific Working Groups  

Science Conference Proceedings (OSTI)

... TWGDAM 1988). SWGDOG, Scientific Working Group on Dogs and Orthogonal Detection Guidelines, 2004. SWGTOX, Scientific ...

2013-07-10T23:59:59.000Z

416

Solar Ready Buildings Planning Guide  

NLE Websites -- All DOE Office Websites (Extended Search)

78 78 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-7A2-46078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson Prepared under Task No. PVC9.92DA NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any

417

Solar Ready Buildings Planning Guide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6078 6078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson National Renewable Energy Laboratory 1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Operated by the Alliance for Sustainable Energy, LLC Contract No. DE-AC36-08-GO28308 Technical Report NREL/TP-7A2-46078 December 2009 Solar Ready Buildings Planning Guide L. Lisell, T. Tetreault, and A. Watson Prepared under Task No. PVC9.92DA NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any

418

Hungarian climate change action plan  

SciTech Connect

In 1994--1996, within the framework of the US Country Studies Program, the Hungarian Country Study Team developed the national greenhouse gas emission inventory, and elaborated the mitigation options for the different sectors of the economy. In 1997, the development of a National Action Plan was begun as the continuation of this work. Results of the inventory study showed that greenhouse gas emissions decreased from the selected base level (i.e., from the yearly average emissions of 1985--1987) until 1994 by cca. 25%. However, this decrease was primarily caused by the deep economic recession. Therefore the policy makers have to face the problem of economic recovery without a relevant increase of greenhouse gas emissions in the near future. This is the main focus of the mitigation analysis and the National Action Plan.

Molnar, S.; Takacs, T. [Systemexpert Consulting Ltd., Budapest (Hungary); Arpasi, M. [MOL, Budapest (Hungary); Farago, T.; Palvoelgyi, T. [Ministry for Environment and Regional Policy, Budapest (Hungary); Harnos, Z. [Univ. of Horticulture, Budapest (Hungary); Lontay, Z. [EGI-Contracting Engineering Co. Ltd., Budapest (Hungary); Somogyi, Z. [Forest Research Inst., Budapest (Hungary); Tajthy, T. [Univ. of Technology, Budapest (Hungary)

1998-12-31T23:59:59.000Z

419

Renewable Energy Working Group | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Working Group Working Group Renewable Energy Working Group October 7, 2013 - 10:17am Addthis The Renewable Energy Working Group provides a forum for Federal agencies and the renewable energy industry to exchange information on existing and planned projects, lessons learned, sources of project funds, and technologies. Guidance The Renewable Energy Working Group is charged with providing guidance about renewable energy regulatory requirements. Federal Renewable Energy Requirement Guidance Under EPAct 2005 and Executive Order 13423 Transmittal Letter Summarizing the Federal Renewable Energy Requirement Guidance Members Led by the Federal Energy Management Program, the Renewable Energy Working Group is made up of more than 100 Federal agency representatives, U.S. Department of Energy programs, and the renewable energy industry.

420

DOE Plans | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Management Certifications and Professional Development Real Estate History DOE Strategic Plans Strategic Plan for the Department of Energy Environmental Restoration...

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

TEC Working Group Background | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Background Background TEC Working Group Background Through the TEC/WG, DOE interacted with representatives of organizations at the state, tribal, and local levels to obtain input for program needs assessment, development and management, and to enhance their capability to carry out transportation emergency preparedness and safety activities specifically related to radioactive materials shipments. TEC membership included representatives from national, state, tribal and local government organizations, labor, industry and professional groups. Members meet semiannually to participate in plenary sessions, breakout work sessions, and in more specialized Topic Groups. To learn more about the history and background of TEC, please see the following documents: TEC Charter TEC Work Plan

422

SERAPH implementation plans  

DOE Green Energy (OSTI)

The Solar Energy Research Institute (SERI) devotes a significant research effort to the application of solar technology in the industrial sector. It is well known that US industries consume a significant amount of energy, a large portion of which is required in a temperature range in which concentrating solar collectors work effectively. The SERAPH facility (Solar Energy Research and Applications in Process Heat) will provide at SERI the capability of addressing many of the technical issues that currently hamper industrial solar thermal energy system implementation. The primary building blocks of SERAPH are the solar delivery subsystem, control, and data acquisition subsystem (including sequencing and emergency supervision), energy distribution subsystem and two physical areas set aside for storage development and the introduction of load devices. Emphasis has been placed on creating a versatile test facility within which the solar industry can work with SERI in the development of solar systems that will be attractive to potential industrial users. SERAPH will have an initial capability of producing steam at a rate of 900 lb/h (410 kg/h) which corresponds to an energy delivery rate of 1.5 million Btu/h (1.6 x 10/sup 6/ kJ/h) at 430/sup 0/F (220/sup 0/C) with expansion capability to approximately 600/sup 0/F (315/sup 0/C). The initial system controls will be analog with supervisory and direct digital control to follow. The issues to be addressed at SERAPH will be computer predictive model validation and refinement, control strategy development, solar equipment evaluation, and the accumulation of operating and maintenance experience. A consistent theme throughout the planning and operation of SERAPH is the need to develop and follow practices that are consistent with conventional industrial operating procedures.

Castle, J.; Su, W.; Dougherty, D.A.; Wright, J.D.

1979-05-01T23:59:59.000Z

423

Engineering Task Plan for the Ultrasonic Inspection of Hanford Double Shell Tanks (DST) FY2000  

SciTech Connect

This document facilitates the ultrasonic examination of Hanford double-shell tanks. Included are a plan for engineering activities (individual responsibilities), plan for performance demonstration testing, and a plan for field activities (tank inspection). Also included are a Statement of Work for contractor performance of the work and a protocol to be followed should tank flaws that exceed the acceptance criteria be discovered.

JENSEN, C.E.

2000-01-10T23:59:59.000Z

424

Department of Energy Customer Service Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Customer Service Plan Customer Service Plan Department of Energy Customer Service Plan The U.S. Department of Energy (DOE) strives to ensure America's security and prosperity by addressing its energy, environmental, and nuclear challenges through transformative science and technology solutions. Through this work, the Department serves a range of internal and external customers including DOE's employee and contractor workforce, students, scientists and researchers, businesses and other branches of federal, state and local government, among many others. With this diverse audience in mind, the Department of Energy's Customer Service Plan focuses on improving customers' access to user-friendly, effective information and resources. DOE_Customer_Service_Plan.pdf More Documents & Publications

425

Interim readiness plan  

SciTech Connect

This report provides rough designs and costs for 3 payloads which can be built on a relatively fast time scale. With these, Lawrence Radiation Laboratory (LRL) could measure neutrons and X-rays from high altitude shots. No measurements of soft X-rays (less than or approximately equal to 5 kev), hard X- rays (greater than or approximately equal to 60 kev), or gamma rays would be made. Plans could be made to fly the Simplex payload as part of the spring Lapwing exercise. Some interim capability exists from other sources which might compliment the above measurements. Sandia has developed a mylar sail sampler which could be used for debris experiments. There is a LASL/Sandia scan converter which could be fielded to make fast time-history measurements of the X-ray or gamma ray pulse. Interval time could be measured with a ground based EMP detector. The LRL cost of this interim rocket program is approximately 5 man years of effort and about $140,000 of major procurement. Sandia would need approximately $450,000 to stockpile payloads. I believe the necessary rockets are already stockpiled but some work on the ranges might be required. For example, more launchers are needed on Johnston Atoll. All this money and effort would be expended in FY- 1970 and these rocket experiments would be ready (`on the shelf` or close) by June 1970.

Seward, F. D.

1969-03-01T23:59:59.000Z

426

http://bellview/TeamWorks/TRUTeamWorks.htm  

NLE Websites -- All DOE Office Websites (Extended Search)

9/04 9/04 Shipments expected this week: NTS (2), RFETS (13), SRS (6) January 29, 2004 The Big Story WTS restructures workforce Topics Characterization News Transportation News Disposal News Safety News Working Smart Announcements Our Team Tools Acronym List Archives Back to Main Page WIPP Home Page Links Feedback Contact us with feedback or submit your e-mail address for updates. Click here to e-mail. WIPP Shipments (as of 1/29/04 at 7:14 a.m.) Shipments scheduled to arrive at WIPP this week 21 Total shipments received at WIPP 2,309 Earlier this week WTS, the management and operating contractor at WIPP, announced a workforce restructuring plan to meet the current and future operational needs of the WIPP facility. It is anticipated

427

Project Execution Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Execution Plan (PEP) Review Module Project Execution Plan (PEP) Review Module March 2010 CD-0 O 0 OFFICE OF P C CD-1 F ENVIRO Standard R Project E Rev Critical Decis CD-2 M ONMENTAL Review Plan Execution view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) n Plan e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

428

Decommissioning Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Decommissioning Plan Review Module Decommissioning Plan Review Module March 2010 CD-0 O 0 C OFFICE OF D C CD-1 F ENVIRO Standard R Decomm Rev Critical Decisi CD-2 M ONMENTAL Review Plan missioning view Module ion (CD) Ap CD March 2010 L MANAGE n (SRP) g Plan e plicability D-3 EMENT CD-4 Post Oper ration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM project review process encompasses key milestones established by DOE O 413.3A, Change 1, Program and Project Management for the Acquisition of Capital Assets, DOE-STD-1189-2008,

429

New Planning Framework  

Science Conference Proceedings (OSTI)

This report describes an investigation into how various regulatory, economic, and technical changes are likely to affect the framework for transmission planning. It begins with an overview of the Existing Planning Framework, structured along the lines of five key aspects that encompass the purview, role, and responsibilities of transmission planning. The report then explores seven scenarios (future states) of transformative change in the electricity industryranging from the greater penetration of wind ge...

2010-12-22T23:59:59.000Z

430

JGI - Sequencing Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Sequencing Plans Sequencing Plans JGI engages users from the National Laboratory system, academic institutions, and private industry to perform sequencing projects that directly relate to the DOE Office of Biological and Environmental Research's missions in alternative energy, global carbon cycling, and bioremediation. JGI's sequencing portfolio is drawn from its user programs, including the Community Science Program and the new Bioenergy Research Centers, as well as targets chosen by DOE to meet programmatic objectives. Plans by Program and Year All projects GEBA Sequencing Plans Community Science Program FY2014 Community Sequencing Program FY2013 Community Sequencing Program FY2012 Community Sequencing Program FY2011 Community Sequencing Program FY2010 Community Sequencing Program FY2009

431

Climate Action Plan (Kentucky)  

Energy.gov (U.S. Department of Energy (DOE))

The Commonwealth of Kentucky established the Kentucky Climate Action Plan Council (KCAPC) process to identify opportunities for Kentucky to respond to the challenge of global climate change while...

432

Cost Sensitive Conditional Planning  

E-Print Network (OSTI)

While POMDPs provide a general platform for conditional planning under a wide range of quality metrics they have limited scalability. On the other hand, uniform probability conditional planners scale very well, but many lack the ability to optimize plan quality metrics. We present an innovation to planning graph based heuristics that helps uniform probability conditional planners both scale and generate high quality plans when using actions with non uniform costs. We make empirical comparisons with two state of the art planners to show the benefit of our techniques.

Daniel Bryce; Subbarao Kambhampati

2005-01-01T23:59:59.000Z

433

Environmental Protection Implementation Plan  

SciTech Connect

This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California`s commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. This report focuses on the following: notification of environmental occurrences; general planning and reporting; special programs and plans; environmental monitoring program; and quality assurance and data verification.

Brekke, D.D.

1995-11-01T23:59:59.000Z

434

SEAB Climate Action Plan  

Energy.gov (U.S. Department of Energy (DOE))

A presentation on the Climate Action Plan presented by Dr. Jonathan Pershing, Deputy Assistant Secretary for Climate Change at the U.S. Department of Energy.

435

Business Plan Competition Opportunities  

The Draper Fisher Jurvetson Venture Challenge is a West Coast business plan competition available to the colleges and universities across the West Coast that

436

Planning and Projects  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning Ten-Year Capital Program Projects Lovell-Yellowtail Transmission Line Rebuild project Studies WACM Wind production summary overview (Oct. 2006)...

437

Planning, Budget, and Analysis  

NLE Websites -- All DOE Office Websites (Extended Search)

EERE Planning, Budget, and Analysis (Revised) Philip Patterson (Economist) and Jeff Dowd (Economist) DOE Hydrogen, Fuel Cells, and Infrastructure Technologies Program Systems...

438

Workforce Diversity Action Plans  

NLE Websites -- All DOE Office Websites (Extended Search)

Workforce Diversity Action Plans Workforce Diversity Office Best Practices Diversity Council Compendium of Diversity Activities Principles for a Diverse Community Lawrence Berkeley...

439

Operations Strategic Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Operations Strategic Plan Updated July 2009 Operations Organization Chief Operating Officer (COO) Deputy COO Environment, Health & Safety EH&S Facilities FAC Project Management...

440

Hoisting & Rigging Lift Plan  

NLE Websites -- All DOE Office Websites (Extended Search)

Authorized Personnel (attach more sheets if necessary) Printed name Signature Date SSRL Hoisting & Rigging Lift Plan Stanford Synchrotron Radiation Laboratory May 16, 2005...

Note: This page contains sample records for the topic "observational work plan" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

ORISE: Exercise Planning  

NLE Websites -- All DOE Office Websites (Extended Search)

Oak Ridge Institute for Science and Education (ORISE) helps federal, state and local emergency management personnel plan and prepare for the threat of a national security or...

442

Hanford Site Strategic Facilities Plan: Site planning  

SciTech Connect

This plan revises the Hanford Site Strategic Facilities Plan submitted by Westinghouse Hanford Company in 1988. It separates the Hanford Site facilities into two categories: ''strategically required'' facilities and ''marginal'' facilities. It provides a comparison of future facility requirements against existing capacities and proposed projects to eliminate or consolidate marginal facilities (i.e., those facilities that are not fully utilized or are no longer required to accomplish programmatic missions). The objective is to enhance the operating efficiency of the Hanford Site by maximizing facility use and minimizing unnecessary facility operating and maintenance costs. 11 refs.

1989-03-01T23:59:59.000Z

443

Working Group Reports Unmanned Aerospace Vehicle Workshop J. Vitko, Jr.  

NLE Websites -- All DOE Office Websites (Extended Search)

Working Group Reports Unmanned Aerospace Vehicle Workshop J. Vitko, Jr. Sandia National Laboratories Livermore, California The Unmanned Aerospace Vehicle (UAV) Workshop concentrated on reviewing and refining the science experiments planned for the UAV Demonstration Flights (UDF) scheduled at the Oklahoma Cloud and Radiation Testbed (CART) in April 1994. These experiments are summarized below. UDF Experiments 1. Clear sky, daylight Scientific questions: Do models and observations agree? Under varying conditions (low/high humidity, low/high aerosols)? How accurately can we measure fluxes? What is the impact of surface "patchiness" in the visible? In the IR? At what length scales does it average out? Flight profiles: Minimum of 2 hrs centered on solar noon, clear sky, three altitude tiers, 10- to 20-km legs;

444

Electrical Safe Work Practices  

NLE Websites -- All DOE Office Websites (Extended Search)

Electrical Safe Work Practices Electrical Safe Work Practices July 15, 2005 NOTE: Working hot is a last alternative All activities on or near electrically energized systems having live parts shall be conducted in accordance with the limitations and procedures specified in the latest version of NFPA 70E and with the safe work practices and conditions that follow. Only qualified personnel {as defined in NFPA 70E Article 110.6(D)} as authorized by supervisor can perform such work. Safe Work Practices: Know the equipment and potential hazards - Define the scope of work. Submit the scope of work to your supervisor for approval. Analyze the hazards use engineered methods to mitigate hazards. Establish procedures as necessary. Use barricades or other means to prevent unqualified persons crossing approach boundaries.

445

U.S.-Canada Clean Energy Dialogue (CED) Action Plan | Department...  

NLE Websites -- All DOE Office Websites (Extended Search)

U.S.-Canada Clean Energy Dialogue (CED) Action Plan U.S.-Canada Clean Energy Dialogue (CED) Action Plan First Report of the U.S.-Canada Clean Energy Dialogue Working Groups...

446

Transit planning in Curitiba and Bogot : roles in interaction, risk, and change  

E-Print Network (OSTI)

What is the role of planners in the planning process for new transit modes? By documenting transit-planning processes in Curitiba and Bogota from 1955-95 and 1986-2001, respectively, this work demonstrates that in both ...

Ardila Gmez, Arturo

2004-01-01T23:59:59.000Z

447

U.S.-Brazil Binational Joint Action Plan | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S.-Brazil Binational Joint Action Plan U.S.-Brazil Binational Joint Action Plan U.S.-Brazil Binational Energy Working Group, formed on July 20, 2010, when DOE and the Brazilian...

448

U.S.-Canada Clean Energy Dialogue (CED) Action Plan II  

Energy.gov (U.S. Department of Energy (DOE))

Action Plan II describes initiatives that the U.S.-Canada Clean Energy Dialogue Working Groups plan to implement under Phase II of the CED to further progress toward a low-carbon economy that...

449

UMTRA Project: Environment, Safety, and Health Plan  

SciTech Connect

The US Department of Energy has prepared this UMTRA Project Environment, Safety, and Health (ES and H) Plan to establish the policy, implementing requirements, and guidance for the UMTRA Project. The requirements and guidance identified in this plan are designed to provide technical direction to UMTRA Project contractors to assist in the development and implementation of their ES and H plans and programs for UMTRA Project work activities. Specific requirements set forth in this UMTRA Project ES and H Plan are intended to provide uniformity to the UMTRA Project`s ES and H programs for processing sites, disposal sites, and vicinity properties. In all cases, this UMTRA Project ES and H Plan is intended to be consistent with applicable standards and regulations and to provide guidance that is generic in nature and will allow for contractors` evaluation of site or contract-specific ES and H conditions. This plan specifies the basic ES and H requirements applicable to UMTRA Project ES and H programs and delineates responsibilities for carrying out this plan. DOE and contractor ES and H personnel are expected to exercise professional judgment and apply a graded approach when interpreting these guidelines, based on the risk of operations.

Not Available

1995-02-01T23:59:59.000Z

450

Implementing change in the facilities planning process  

SciTech Connect

In the post-Cold War climate of reduced budgets at the national laboratories, the Sites Planning Department at Sandia National Laboratories was faced with the problem of securing funding for capital construction projects in a very competitive environment. The Department of Energy (DOE), felt that requests for new facilities were not always well coordinated with its mission needs. The Sites Planning Department needed to revolutionize the way they were doing business. To be successful in obtaining approval and funding for future facilities, they recognized the need to concentrate their efforts on project proposals that tap strategic programs at DOE. The authors developed a series of new processes to identify, evaluate, prioritize, and develop line item project proposals to request approval and obtain funding. A matrixed group of sites and facilities directors was formed to establish criteria and make preliminary recommendations to upper management. Matrixed working groups were also established at the staff level to develop and prepare projects for the prioritization process. Ultimately, similar processes will be applied to all project types, and a prioritized plan generated for each. These plans will become the blueprint for an overarching strategic site plan. What started as a means of increasing success in obtaining approval and funding of capital projects has launched a whole new approach to project development that permits incorporation of facilities planning into overall corporate strategic planning.

Williams, J.L. [Sandia National Labs., Albuquerque, NM (United States). Sites Planning Dept.

1995-08-01T23:59:59.000Z

451

Agencies plan continued DOE landfill remediation  

NLE Websites -- All DOE Office Websites (Extended Search)

Agencies plan continued DOE landfill remediation Agencies plan continued DOE landfill remediation The U.S. Department of Energy (DOE), Idaho Department of Environmental Quality and U.S. Environmental Protection Agency have released a planning document that specifies how DOE will continue to remediate a landfill containing hazardous and transuranic waste at DOE's Idaho Site located in eastern Idaho. The Phase 1 Remedial Design/Remedial Action Work Plan for Operable Unit 7-13/14 document was issued after the September 2008 Record of Decision (ROD) and implements the retrieval of targeted waste at the Subsurface Disposal Area (SDA) within the Radioactive Waste Management Complex (RWMC). The SDA began receiving waste in 1952 and contains radioactive and chemical waste in approximately 35 acres of disposal pits, trenches and soil vaults.

452

National Security Technology Incubator Action Plan  

SciTech Connect

This report documents the action plan for developing the National Security Technology Incubator (NSTI) program for southern New Mexico. The NSTI program is being developed as part of the National Security Preparedness Project (NSPP), funded by Department of Energy (DOE)/National Nuclear Security Administration (NNSA). This action plan serves as a tool in measuring progress in the development process and delivery of services for the NSTI program. Continuous review and evaluation of the action plan is necessary in the development process of the NSTI. The action plan includes detailed steps in developing the NSTI program based on recommended best practices in incubator development by the National Business Incubation Association (NBIA). Included are tasks required to implement the NSTI, developed within a work breakdown structure. In addition, a timeline is identified for each task.

2008-02-28T23:59:59.000Z

453

Energy Sector-Specific Plan: An Annex to the National Infrastructure  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Sector-Specific Plan: An Annex to the National Sector-Specific Plan: An Annex to the National Infrastructure Protection Plan Energy Sector-Specific Plan: An Annex to the National Infrastructure Protection Plan In its role as the lead Sector-Specific Agency for the Energy Sector, the Department of Energy has worked closely with dozens of government and industry partners to prepare this updated 2010 Energy Sector-Specific Plan (SSP). Much of that work was conducted through the two Energy Sector Coordinating Councils (SCCs) and the Energy Government Coordinating Council (GCC). Energy Sector-Specific Plan: An Annex to the National Infrastructure Protection Plan More Documents & Publications National Infrastructure Protection Plan Energy: Critical Infrastructure and Key Resources Sector-Specific Plan as

454

Live Working Resource Forum  

Science Conference Proceedings (OSTI)

This project involves development of a Live Working Resource Forum for documenting common and unique live work practices. It also serves as a repository of lessons learned derived from analysis of live work incidents. This Technical Update report is the design document of the Forum.

2006-12-14T23:59:59.000Z

455

Working Group 7 Summary  

SciTech Connect

The primary subject of working group 7 at the 2012 Advanced Accelerator Concepts Workshop was muon accelerators for a muon collider or neutrino factory. Additionally, this working group included topics that did not fit well into other working groups. Two subjects were discussed by more than one speaker: lattices to create a perfectly integrable nonlinear lattice, and a Penning trap to create antihydrogen.

Nagaitsev S.; Berg J.

2012-06-10T23:59:59.000Z

456

Microsoft Word - Document Numbering Plan.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

document Number Plan 11/3/2005 document Number Plan 11/3/2005 All documents numbers start with a 9 9 _ _ ___ | | | | | Document per chart | Generation (i.e. PSS has 1,2&3, FEEPS has 1&2) Use 0 when the document doesn't apply to any of these System 0- Non system Specific (group wide) 1- PSS 2- Reserved for PSS expansion 3- FEEPS 4- Reserved for FEEPS expansion 5- BLEPS 6- Reserved for BLEPS expansion 7- DIW 8- Reserved for future use 9- Reserved for future use 000-099 Requirements 000 - Statement of work For x.1.4.1.4 - Design Statement of Work For Beamlines - Installation Statement of Work 001-009 Reserved for Statement of Works for upgrade, revisions, add-ons, etc. 010 - Cost Estimate 011-019 Additional Cost Estimates