Powered by Deep Web Technologies
Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

DOE - Office of Legacy Management -- University of Washington - WA 0-01  

Office of Legacy Management (LM)

Washington - WA 0-01 Washington - WA 0-01 FUSRAP Considered Sites Site: UNIVERSITY OF WASHINGTON (WA.0-01) Eliminated from further consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Seattle , Washington WA.0-01-1 Evaluation Year: 1987 WA.0-01-1 Site Operations: Research activities involving small quantities of radioactive materials in a controlled environment. WA.0-01-1 Site Disposition: Eliminated - Potential for residual radioactive contamination considered remote - Operating under active NRC license WA.0-01-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: None Indicated WA.0-01-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP Also see

2

File:06-WA-b - Washington Construction Storm Water Permit.pdf | Open Energy  

Open Energy Info (EERE)

File File Edit History Facebook icon Twitter icon » File:06-WA-b - Washington Construction Storm Water Permit.pdf Jump to: navigation, search File File history File usage Metadata File:06-WA-b - Washington Construction Storm Water Permit.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 60 KB, MIME type: application/pdf, 2 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 15:28, 6 December 2013 Thumbnail for version as of 15:28, 6 December 2013 1,275 × 1,650, 2 pages (60 KB) Alevine (Talk | contribs) 15:25, 6 December 2013 Thumbnail for version as of 15:25, 6 December 2013 1,275 × 1,650, 2 pages (60 KB) Alevine (Talk | contribs)

3

,"Washington Natural Gas Summary"  

U.S. Energy Information Administration (EIA) Indexed Site

1: Prices" "Sourcekey","N3050WA3","N3010WA3","N3020WA3","N3035WA3","N3045WA3" "Date","Natural Gas Citygate Price in Washington (Dollars per Thousand Cubic Feet)","Washington...

4

A WASHINGTON STATE UNIVERSITY POSTDOCTORAL POSITION FOR WORK AT LIGO HANFORD, WA Applications are invited for a postdoctoral position in the Gravity Group at the Department of Physics  

E-Print Network [OSTI]

A WASHINGTON STATE UNIVERSITY POSTDOCTORAL POSITION FOR WORK AT LIGO HANFORD, WA Applications characterization for the Advanced Laser Interferometer Gravitational wave Observatory (LIGO) at the Hanford site characterization at the LIGO Hanford observatory. Familiarity with data analysis pipelines for searching

Collins, Gary S.

5

Department of Political Science Box 353530 University of Washington Seattle, WA 98195-3530 phone: (206) 543-2780 fax: (206) 685-2146 www.polisci.washington.edu  

E-Print Network [OSTI]

Department of Political Science · Box 353530 · University of Washington · Seattle, WA 98195-3530 phone: (206) 543-2780 · fax: (206) 685-2146 · www.polisci.washington.edu Highlights Political science rating in the Princeton Review 2010 list of "great schools to study political science." The department

Anderson, Richard

6

Corinna Cisneros, S.M. Golam Mortuza, and Soumik Banerjee School of Mechanical and Materials Engineering, Washington State University, Pullman, WA 99163  

E-Print Network [OSTI]

Engineering, Washington State University, Pullman, WA 99163 Organic Photovoltaic Solar Cells: A Molecular of fossil fuel resources has lead to global energy crisis with an increasing effort in the scientific community to develop renewable energy technologies. Solar cell technology has generated significant

Collins, Gary S.

7

Jasmine R. Scott1, Nathan Tarlyn2, Amit Dhingra2 and Kate Evans2 1Fort Valley State University, GA and 2Department of Horticulture, Washington State University, WA  

E-Print Network [OSTI]

and 2Department of Horticulture, Washington State University, WA Time travel with apples: Can you see on selection media in the dark. After a week, cultures were moved to the light to induce shoot development

Collins, Gary S.

8

Washington  

Broader source: Energy.gov (indexed) [DOE]

Washington Washington , DC 20585 September 20, 2012 MEMORANDUM FOR HEADS OF CONTRACTING ACTIVITY AND PROCUREMENT DIRECTORS FROM : SUBJECT: PAULBOSCO~~ - SENIOR PROCUhM~ OFFICE OF ACQUISITION AND PROJECT MANAGEMENT JOSEPH F. WADDELL SENIOR PROCUREMENT NNSA OFFICE OF ACQ SITION MANAGEMENT Acquisition Savings Reporting Template Guidance The Department is continuing to make progress in its efforts to support the Office of Management and Budget (OMB) Acquisition Savings Initiative, as well as the Department's Strategic Sourcing Program. After using our current reporting template for the past year, it was a good time to review the process and make adjustments where necessary. The Government Accountability Office (GAO) has also noted in an audit that

9

Washington State Department of Transportation | Open Energy Informatio...  

Open Energy Info (EERE)

Washington State Department of Transportation Abbreviation: WDOT Place: Olympia, Washington Phone Number: 360-705-7000 Website: http:www.wsdot.wa.gov References: Washington...

10

RAPID/Roadmap/9-WA-a | Open Energy Information  

Open Energy Info (EERE)

(EIS) is necessary. Contact Information Agency Washington State Department of Ecology Position State Environmental Issues Contact Name Fran Sant Email fran.sant@ecy.wa.gov...

11

GRR/Section 18-WA-a - Underground Storage Tank Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 18-WA-a - Underground Storage Tank Process GRR/Section 18-WA-a - Underground Storage Tank Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-WA-a - Underground Storage Tank Process 18-WA-a - Underground Storage Tank Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington Chapter 90.76 Washington Administrative Code Chapter 173-360 Triggers None specified Washington has a federally-approved state Underground Storage Tank (UST) program regulated by the Washington State Department of Ecology (WSDE) under Revised Code of Washington Chapter 90.76 and Washington Administrative Code Chapter 173-360. Washington defines an "Underground

12

ASM International NV | Open Energy Information  

Open Energy Info (EERE)

NV Jump to: navigation, search Name: ASM International NV Place: Bilthoven, Netherlands Product: Supplier of semiconductor process equipment in both front- and back-end markets,...

13

GRR/Section 14-WA-d - Section 401 Water Quality Certification | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-WA-d - Section 401 Water Quality Certification GRR/Section 14-WA-d - Section 401 Water Quality Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-WA-d - Section 401 Water Quality Certification 14-WA-d - 401 Water Quality Certification.pdf Click to View Fullscreen Contact Agencies U S Army Corps of Engineers Washington State Department of Ecology Regulations & Policies Revised Statute of Washington Chapter 90.48 Washington Administrative Code Chapter 173-201A Washington Administrative Code 173-225-030 Triggers None specified Developers requiring a Section 404 Dredge and Fill Permit from the U S Army Corps of Engineers (Corps) are required to obtain a Section 401 Water Quality Certification from the state of Washington. The Washington State

14

GRR/Section 19-WA-b - New Water Right Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 19-WA-b - New Water Right Permit Process GRR/Section 19-WA-b - New Water Right Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-b - New Water Right Permit Process 19-WA-b - New Water Right Permit Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington Chapter 90.03 Revised Code of Washington Chapter 90.44 Triggers None specified Washington uses a prior appropriation system for the distribution of both surface water and ground water rights in which water users receive the right to use water on a "first in time, first in right" basis. Under Washington law, the waters of Washington belong collectively to the public

15

GRR/Section 19-WA-a - Water Access and Water Rights Overview | Open Energy  

Open Energy Info (EERE)

9-WA-a - Water Access and Water Rights Overview 9-WA-a - Water Access and Water Rights Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-a - Water Access and Water Rights Overview 19-WA-a - Water Access and Water Rights Overview.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington Chapter 90.03 Revised Code of Washington Chapter 90.44 RCW 90.44.050 Triggers None specified Similar to many western states, only a small amount of water is available for appropriation in Washington. As a result, Washington has developed a comprehensive regulatory scheme for the distribution of water rights and use of water in the state. Washington employs a prior appropriation or

16

Category:Reno, NV | Open Energy Information  

Open Energy Info (EERE)

NV" NV" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Reno NV Nevada Power Co.png SVFullServiceRestauran... 63 KB SVHospital Reno NV Nevada Power Co.png SVHospital Reno NV Nev... 72 KB SVLargeHotel Reno NV Nevada Power Co.png SVLargeHotel Reno NV N... 68 KB SVLargeOffice Reno NV Nevada Power Co.png SVLargeOffice Reno NV ... 68 KB SVMediumOffice Reno NV Nevada Power Co.png SVMediumOffice Reno NV... 67 KB SVMidriseApartment Reno NV Nevada Power Co.png SVMidriseApartment Ren... 68 KB SVOutPatient Reno NV Nevada Power Co.png SVOutPatient Reno NV N... 66 KB SVPrimarySchool Reno NV Nevada Power Co.png SVPrimarySchool Reno N... 71 KB SVQuickServiceRestaurant Reno NV Nevada Power Co.png SVQuickServiceRestaura... 66 KB SVSecondarySchool Reno NV Nevada Power Co.png

17

GRR/Section 15-WA-a - Air Quality Notice of Construction Permit | Open  

Open Energy Info (EERE)

5-WA-a - Air Quality Notice of Construction Permit 5-WA-a - Air Quality Notice of Construction Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-WA-a - Air Quality Notice of Construction Permit 15-WA-a - Air Quality Notice of Construction Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies WAC 173-400-110 WAC 173-400-111 WAC 173-400-171 Triggers None specified This flowchart illustrates the process for obtaining an Air Quality Notice of Construction Permit. The Washington State Department of Ecology (WSDE) oversees the permitting process under WAC 173-400. 15-WA-a - Air Quality Notice of Construction Permit.pdf 15-WA-a - Air Quality Notice of Construction Permit.pdf 15-WA-a - Air Quality Notice of Construction Permit.pdf

18

GRR/Section 19-WA-c - Transfer or Change of Water Right | Open Energy  

Open Energy Info (EERE)

9-WA-c - Transfer or Change of Water Right 9-WA-c - Transfer or Change of Water Right < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-c - Transfer or Change of Water Right 19-WA-c - Transfer or Change of Water Right.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington 90.03.380 Revised Code of Washington 90.44.100 Revised Code of Washington Chapter 90.80 Triggers None specified Much of Washington's public waters have been accounted for through water right claims, permits, or certificates. As a result, many individuals seeking water rights try to acquire existing water rights already in use or change the use of a current water right they already hold. Certain elements

19

GRR/Section 12-WA-a - Live Wildlife Taking Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 12-WA-a - Live Wildlife Taking Permit GRR/Section 12-WA-a - Live Wildlife Taking Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-WA-a - Live Wildlife Taking Permit 12-WA-a - Live Wildlife Taking Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Fish and Wildlife Regulations & Policies WAC 232-12-064 Triggers None specified In Washington, it is unlawful to take wildlife from the wild without permission from the Washington State Department of Fish and Wildlife (WDFW). The WDFW issues Live Wildlife Taking Permits under WAC 232-12-064. 12-WA-a - Live Wildlife Taking Permit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

20

GRR/Section 19-WA-f - Water Well NOI for Replacement or Additional Wells |  

Open Energy Info (EERE)

GRR/Section 19-WA-f - Water Well NOI for Replacement or Additional Wells GRR/Section 19-WA-f - Water Well NOI for Replacement or Additional Wells < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-f - Water Well NOI for Replacement or Additional Wells 19-WA-f - Water Well NOI for Replacement or Additional Wells.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington 90.44.100 Revised Code of Washington 18.104.048 Washington Administrative Code 173-160-151 Triggers None specified A developer seeking to use ground water for an activity may need to drill a new well in a different location than a previous well, drill an additional well at an existing location, or drill a replacement well at the same

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

GRR/Section 14-WA-c - Underground Injection Control Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-WA-c - Underground Injection Control Permit GRR/Section 14-WA-c - Underground Injection Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-WA-c - Underground Injection Control Permit 14-WA-c - Underground Injection Control Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Chapter 173-218 WAC Non-endangerment Standard Triggers None specified The Safe Drinking Water Act requires Washington to implement technical criteria and standards to protect underground sources of drinking water from contamination. Under Chapter 173-218 WAC, the Washington State Department of Ecology (WSDE) regulates and permits underground injection control (UIC) wells in Washington. The Environmental Protection Agency

22

GRR/Section 3-WA-e - State Right of Way Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-e - State Right of Way Process GRR/Section 3-WA-e - State Right of Way Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-e - State Right of Way Process 3-WA-e - State Right of Way Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies RCW 79-36-350 RCW 79-36-520 RCW 79-36-530 Triggers None specified This flowchart illustrates the process for obtaining a right of way over state lands in Washington. The right of way process is overseen by the Washington State Department of Natural Resources (WSDNR). The right of way process is regulated under Revised Code of Washington (RCW) 79-36-350. The developer may apply for an easement, permit or license for a right of

23

GRR/Section 19-WA-d - Water Conservancy Board Transfer or Change of Water  

Open Energy Info (EERE)

19-WA-d - Water Conservancy Board Transfer or Change of Water 19-WA-d - Water Conservancy Board Transfer or Change of Water Right < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-d - Water Conservancy Board Transfer or Change of Water Right 19-WA-d - Water Conservancy Board Transfer or Change of Water Right.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington Chapter 90.80 RCW 90.03.380 90.03.390 RCW 90.44.100 Triggers None specified In 1997, the Washington Legislature authorized the creation of water conservancy boards through the enactment of Revised Code of Washington Chapter 90.80 to expedite the administrative process for voluntary water right transfers within individual counties. In counties where a water

24

GRR/Section 19-WA-e - Water Well Notice of Intent for New Well | Open  

Open Energy Info (EERE)

GRR/Section 19-WA-e - Water Well Notice of Intent for New Well GRR/Section 19-WA-e - Water Well Notice of Intent for New Well < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-WA-e - Water Well Notice of Intent for New Well 19-WA-e - Water Well Notice of Intent for New Well.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies Revised Code of Washington 18.104.048 Washington Administrative Code 173-160-151 Triggers None specified A developer seeking to use ground water for an activity may need to drill a new well to access the ground water. When a developer needs to drill a new well, the developer must complete the Notice of Intent (NOI) to Drill a Well form and submit the form to the Washington State Department of Ecology

25

GRR/Section 4-WA-a - State Exploration Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 4-WA-a - State Exploration Process GRR/Section 4-WA-a - State Exploration Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-WA-a - State Exploration Process 4-WA-a State Exploration Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies Geothermal Act 78.60 RCW Geothermal Rules 332-17 WAC Triggers None specified Geothermal exploration in Washington requires a Geothermal Exploration Permit from the Washington State Department of Natural Resources (WSDNR) for invasive exploration or drilling. Operations that require an exploration or drilling permit will also require the developer to initiate the State Environmental Policy Act (SEPA). In Washington geothermal resources are regulated under Chapter 78.60 RCW

26

Box 351200 Seattle WA 98195-2100 206-685-0952 VOICE 206-616-6101 FAX www.cfr.washington.edu C:\\DOCUME~1\\cece\\LOCALS~1\\Temp\\im028033.doc  

E-Print Network [OSTI]

Agency Reform Committee (ad hoc) (J. Fridley, C. Grue, L. Rogers, C. Ryan, M. Wecker [Chair]) From: Tom Hinckley, Interim Director Re: Charge to the Committee The Washington Natural Resource Agency Reform ad hoc resource agency reform initiative. The initiative is likely to impact SFR and other units in Co

Borenstein, Elhanan

27

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

8, 2011 8, 2011 CX-006063: Categorical Exclusion Determination Limited Firebreak Maintenance on the Hanford Site During Calendar Year 2011 CX(s) Applied: B1.3 Date: 06/28/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 24, 2011 EIS-0425: Draft Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA June 24, 2011 EIS-0425: EPA Notice of Availability of Draft Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA June 22, 2011 CX-006255: Categorical Exclusion Determination Indian Cabin Road Repair Date: 06/22/2011 Location(s): Skamania County, Washington Office(s): Bonneville Power Administration

28

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

July 17, 2009 July 17, 2009 EIS-0424: Notice of Intent to Prepare an Environmental Impact Statement Klickitat Hatchery Program, Klickitat and Yakima Counties, WA July 1, 2009 EA-1660: Final Environmental Assessment Combined Community Communications Facility and Infrastructure Cleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland, Washington April 21, 2009 EIS-0419: Notice of Intent to Prepare an Environmental Impact Statement Whistling Ridge Energy Project in Skamania County, Washington. March 12, 2009 State Energy Program Assurances - Washington Governor Gregoire Letter from Washington Governor Gregoire providing Secretary Chu with the assurances needed so that Recovery Act funds can be made available. These assurances are required by Section 410 of the American Recovery and

29

File:INL-geothermal-wa.pdf | Open Energy Information  

Open Energy Info (EERE)

wa.pdf wa.pdf Jump to: navigation, search File File history File usage Washington Geothermal Resources Size of this preview: 699 × 600 pixels. Full resolution ‎(4,835 × 4,147 pixels, file size: 3.28 MB, MIME type: application/pdf) Description Washington Geothermal Resources Sources Idaho National Laboratory Authors Patrick Laney; Julie Brizzee Related Technologies Geothermal Creation Date 2003-11-01 Extent State Countries United States UN Region Northern America States Washington File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:45, 16 December 2010 Thumbnail for version as of 12:45, 16 December 2010 4,835 × 4,147 (3.28 MB) MapBot (Talk | contribs) Automated upload from NREL's "mapsearch" data

30

DOE/NV442 Environmental  

Office of Legacy Management (LM)

NV442 NV442 Environmental Verification Sampling and Analysis Plan for Sediment and, Rulison Drilling Effluent Pond Environmental Restoration This report has been re,produced from the best available copy. Available in paper copy and microfiche. Number of pages in this report: 55 DOE and DOE contractors can obtain copies of this report from: Office of Sciennific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831. (615) 576-8401. This report is publicly available from the Department of Commerce, National Technical Information Service, 5285 Port Royal Road, Springfield. VPi 22 16 1. (703) 487-4650. VERIFICATION SAMPLING AND ANALYSIS PLAN FOR SEDIMENT AND WATER SAMPLING RULISON DRILLING EFFLUENT POND DOE Nevada Operations Office Las Vegas, Nevada

31

GRR/Section 3-WA-b - Land Access Overview | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-b - Land Access Overview GRR/Section 3-WA-b - Land Access Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-b - Land Access Overview 3-WA-b - Land Access Overview.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Triggers None specified Any developer that needs access to or through state lands must obtain the appropriate permit or lease. The developer will obtain such permit or lease through the Washington State Department of Natural Resources. 3-WA-b - Land Access Overview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

32

GRR/Section 5-WA-a - Drilling and Well Development | Open Energy  

Open Energy Info (EERE)

GRR/Section 5-WA-a - Drilling and Well Development GRR/Section 5-WA-a - Drilling and Well Development < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 5-WA-a - Drilling and Well Development 5-WA-a.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies Geothermal Act 78.60 RCW Geothermal Rules 332-17 WAC Triggers None specified In Washington geothermal drilling and well development are regulated by the Washington State Department of Natural Resources (WSDNR). Geothermal production wells and core holes deeper than 750ft require the developer go through the whole WSDNR permitting process (which requires a public hearing) and require that the developer complete the State Environmental

33

GRR/Section 3-WA-d - State Land Lease | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-d - State Land Lease GRR/Section 3-WA-d - State Land Lease < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-d - State Land Lease 3-WA-d - State Land Lease.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies RCW 79-13-020 RCW 79-13-140 RCW 79-13-150 WAC 332-22-030 WAC 332-22-105 WAC 332-22-110 Triggers None specified This flowchart illustrates the process used to lease state lands in Washington. The Washington State Department of Natural Resources (WSDNR) oversees the land leasing process through the Commissioner of Public Lands ("commissioner"). The WSDNR may lease state lands for purposes it deems advisable, including commercial, industrial, residential, agricultural, and

34

GRR/Section 3-WA-a - State Geothermal Lease | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 3-WA-a - State Geothermal Lease GRR/Section 3-WA-a - State Geothermal Lease < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-a - State Geothermal Lease 3-WA-a State Geothermal Lease.pdf Click to View Fullscreen Contact Agencies Washington State Department of Natural Resources Regulations & Policies Chapter 79.14 RCW Chapter 344-12 WAC Triggers None specified The State of Washington is still in the process of developing and finalizing the rules and regulations related to geothermal leases on state lands; however, the Washington State Department of Natural Resources (WSDNR) expects the process to be similar to the process for leasing state lands for oil and natural gas development. The rules and regulations for

35

GRR/Section 11-WA-c - Archaeological Resource Discovery Process | Open  

Open Energy Info (EERE)

GRR/Section 11-WA-c - Archaeological Resource Discovery Process GRR/Section 11-WA-c - Archaeological Resource Discovery Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-WA-c - Archaeological Resource Discovery Process 11-WA-c - Archaeological Resource Discovery Process.pdf Click to View Fullscreen Triggers None specified In the state of Washington, cultural resource concerns are integrated as early as possible into the planning for capital projects and are protected if discovered during construction. Washington defines "Cultural resources" as archeological and historical sites and artifacts, and traditional areas or items of religious, ceremonial and social uses to affected tribes. Washington defines an "Archaeological resource" as any

36

GRR/Section 9-WA-b - State Environmental Review | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 9-WA-b - State Environmental Review GRR/Section 9-WA-b - State Environmental Review < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-WA-b - State Environmental Review 9-WA-b - State Environmental Review.pdf Click to View Fullscreen Triggers None specified Once the lead agency is determined they are responsible for continuing forward with environmental review. In Washington, environmental review is effectuated through the developer completing an Environmental Checklist which assists the lead agency in determining whether the proposal will likely result in negative impacts on the environment. 9-WA-b - State Environmental Review.pdf 9-WA-b - State Environmental Review.pdf Error creating thumbnail: Page number not in range.

37

Better Buildings Neighborhood Program: Seattle, Washington  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Seattle, Seattle, Washington to someone by E-mail Share Better Buildings Neighborhood Program: Seattle, Washington on Facebook Tweet about Better Buildings Neighborhood Program: Seattle, Washington on Twitter Bookmark Better Buildings Neighborhood Program: Seattle, Washington on Google Bookmark Better Buildings Neighborhood Program: Seattle, Washington on Delicious Rank Better Buildings Neighborhood Program: Seattle, Washington on Digg Find More places to share Better Buildings Neighborhood Program: Seattle, Washington on AddThis.com... Better Buildings Residential Network Progress Stories Interviews Videos Events Quick Links to Partner Information AL | AZ | CA | CO | CT FL | GA | IL | IN | LA ME | MD | MA | MI | MO NE | NV | NH | NJ | NY NC | OH | OR | PA | SC TN | TX | VT | VI | VA

38

NV Energy Electricity Storage Valuation  

SciTech Connect (OSTI)

This study examines how grid-level electricity storage may benet the operations of NV Energy in 2020, and assesses whether those benets justify the cost of the storage system. In order to determine how grid-level storage might impact NV Energy, an hourly production cost model of the Nevada Balancing Authority (\\BA") as projected for 2020 was built and used for the study. Storage facilities were found to add value primarily by providing reserve. Value provided by the provision of time-of-day shifting was found to be limited. If regulating reserve from storage is valued the same as that from slower ramp rate resources, then it appears that a reciprocating engine generator could provide additional capacity at a lower cost than a pumped storage hydro plant or large storage capacity battery system. In addition, a 25-MW battery storage facility would need to cost $650/kW or less in order to produce a positive Net Present Value (NPV). However, if regulating reserve provided by storage is considered to be more useful to the grid than that from slower ramp rate resources, then a grid-level storage facility may have a positive NPV even at today's storage system capital costs. The value of having storage provide services beyond reserve and time-of-day shifting was not assessed in this study, and was therefore not included in storage cost-benefit calculations.

Ellison, James F.; Bhatnagar, Dhruv; Samaan, Nader A.; Jin, Chunlian

2013-06-30T23:59:59.000Z

39

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

January 25, 2010 January 25, 2010 EIS-0391: Updated Notice of Public Hearings Tank Closure and Waste Management for the Hanford Site, Richland, WA January 13, 2010 CX-000471: Categorical Exclusion Determination Limited Prescribed Burning on the Hanford Site During October, November, and December of 2010 to Maintain Critical Fire Breaks CX(s) Applied: B1.3 Date: 01/13/2010 Location(s): Benton County, Washington Office(s): Environmental Management, Office of River Protection-Richland Office January 8, 2010 EIS-0391: Notice of Public Hearings Tank Closure and Waste Management for the Hanford Site, Richland, WA January 1, 2010 EIS-0222: Final Environmental Impact Statement Hanford Comprehensive Land-Use Plan December 18, 2009 EIS-0391: Notice of Modification of Preferred Alternatives

40

Washington | Building Energy Codes Program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Washington Washington Last updated on 2013-11-05 Current News The Washington State Building Code Council recently completed deliberations on adoption and amendment of the 2012 codes. This includes adoption of the 2012 IECC with state amendments. The new codes became effective July 1, 2013. Commercial Residential Code Change Current Code State Specific Amendments / Additional State Code Information WA 2012 Nonresidential Codes Approved Compliance Tools Nonresidential Energy Code Compliance Tools Approximate Energy Efficiency Equivalent to ASHRAE 90.1-2010 Effective Date 07/01/2013 Adoption Date 02/01/2013 Code Enforcement Mandatory DOE Determination ASHRAE 90.1-2007: Yes ASHRAE 90.1-2010: Yes Washington DOE Determination Letter, May 31, 2013 Washington State Certification of Commercial and Residential Building Energy Codes

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

GRR/Section 14-WA-b - State NPDES Permitting Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-WA-b - State NPDES Permitting Process GRR/Section 14-WA-b - State NPDES Permitting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-WA-b - State NPDES Permitting Process 14-WA-b - State NPDES Permitting Process.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology United States Environmental Protection Agency Regulations & Policies Clean Water Act Chapter 90.48 RCW Chapter 173-216 WAC Triggers None specified Section 402 of the Clean Water Act (CWA) required the Environmental Protection Agency (EPA) to establish the National Pollutant Discharge Elimination System (NPDES) to regulate discharge of pollutants from point sources. In Washington, the EPA has delegated responsibility of NPDES to

42

GRR/Section 3-WA-c - Utility Franchise or Permit Process | Open Energy  

Open Energy Info (EERE)

GRR/Section 3-WA-c - Utility Franchise or Permit Process GRR/Section 3-WA-c - Utility Franchise or Permit Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-WA-c - Utility Franchise or Permit Process 3-WA-c - Utility Franchise or Permit Process (1).pdf Click to View Fullscreen Contact Agencies Washington State Department of Transportation Regulations & Policies WAC 468-34-060 WAC 468-34-080 WAC 468-34-110 WAC 468-34-160 WAC 468-34-170 Triggers None specified This flowchart illustrates the process of obtaining a franchise or permit through a state highway right of way in Washington State. A utility permit or franchise is required for occupancy of a highway right of way by utility facilities, including private lines. WAC 468-34-160. The process is

43

Category:Seattle, WA | Open Energy Information  

Open Energy Info (EERE)

Seattle, WA Seattle, WA Jump to: navigation, search Go Back to PV Economics By Location Media in category "Seattle, WA" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Seattle WA Puget Sound Energy Inc.png SVFullServiceRestauran... 60 KB SVHospital Seattle WA Puget Sound Energy Inc.png SVHospital Seattle WA ... 58 KB SVLargeHotel Seattle WA Puget Sound Energy Inc.png SVLargeHotel Seattle W... 57 KB SVLargeOffice Seattle WA Puget Sound Energy Inc.png SVLargeOffice Seattle ... 57 KB SVMediumOffice Seattle WA Puget Sound Energy Inc.png SVMediumOffice Seattle... 61 KB SVMidriseApartment Seattle WA Puget Sound Energy Inc.png SVMidriseApartment Sea... 58 KB SVOutPatient Seattle WA Puget Sound Energy Inc.png SVOutPatient Seattle W... 63 KB

44

GRR/Section 15-WA-b - Air Operating Permit | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 15-WA-b - Air Operating Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-WA-b - Air Operating Permit 15-WA-b - Air Operating Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies WAC 173-401-500 WAC 173-401-800 WAC 173-401-810 WAC 173-401-735 WAC 173-401-610 Triggers None specified This flowchart illustrates the process for obtaining an Air Operating Permit in Washington State. The Washington State Department of Ecology (WSDE) issues Air Operating Permit under WAC 173-401. An Air Operating Permit is required if a facility has the potential to emit

45

EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA | Department  

Broader source: Energy.gov (indexed) [DOE]

49: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA 49: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA SUMMARY This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 9, 2013 EA-1949: FERC Notice of Availability Errata Sheet

46

DOE - Office of Legacy Management -- Shoal Test Site - NV 03  

Office of Legacy Management (LM)

Shoal Test Site - NV 03 Shoal Test Site - NV 03 FUSRAP Considered Sites Site: SHOAL TEST SITE (NV.03 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Sand Springs Range NV.03-1 Location: Near U.S. Highway 50 , Fallon , Nevada NV.03-2 Evaluation Year: 1987 NV.03-2 Site Operations: Underground nuclear detonation site. NV.03-1 Site Disposition: Eliminated - Potential for contamination remote NV.03-2 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: None at the Surface and Fission Fragments Within the Subsurface NV.03-1 Radiological Survey(s): Yes Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to SHOAL TEST SITE NV.03-1 - Report (NVO-1229-105 Part I); Evaluation of the Project

47

NV-TRIBE-SUMMIT LAKE PAIUTE TRIBE  

Broader source: Energy.gov (indexed) [DOE]

NV-TRIBE-SUMMIT LAKE PAIUTE TRIBE NV-TRIBE-SUMMIT LAKE PAIUTE TRIBE Location: Tribe NV-TRIBE-SUMMIT NV LAKE PAIUTE TRIBE American Recovery and Reinvestment Act: Proposed Action or Project Description The Summit Lake Paiute Tribe of Nevada will conduct energy building retrofits on several tribal-owned buildings including: Maintenance Shop (insulate walls and cover insulation to keep in place); Bunkhouse (replace single-pane glass windows, and repair or replace two exit doors); Tribal Administrative Office (replace old electric water heater and three air conditioner/heaters, and replace single-pane glass windows): Community Well Shed (install walls, cover insulation, and replace single-pane glass windows); Cabin #1 and Cabin #2 (insulate and/or replace single-pane windows). Conditions: None

48

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

February 26, 1997 February 26, 1997 EIS-0189: Record of Decision Tank Waste Remediation System, Hanford Site, Richland, WA December 1, 1996 EA-1111: Final Environmental Assessment K Pool Fish Rearing, Hanford Site, Richland, Washington October 21, 1996 EA-1177: Final Environmental Assessment Salvage/Demolition of 200 West Area, 200 East Area, and 300 Area Steam Plants August 1, 1996 EIS-0189: Final Environmental Impact Statement Tank Waste Remediation System, Hanford Site, Richland, Washington May 1, 1996 EIS-0244: Final Environmental Impact Statement Plutonium Finishing Plant Stabilization April 1, 1996 EIS-0259: Final Environmental Impact Statement Disposal of Decommissioned, Defueled Cruiser, Ohio Class, Los Angeles and Class Naval Reactor Plants April 1, 1996 EIS-0259: Final Environmental Impact Statement

49

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

24, 2011 24, 2011 Chemical engineer Alan Zacher 10 Questions for a Chemical Engineer: Alan Zacher Chemical engineer Alan Zacher took some time to share advice for students interested in science and engineering and give us the download on his work developing propylene glycol from renewable sources. March 24, 2011 CX-005523: Categorical Exclusion Determination Washington-City-Bellevue CX(s) Applied: A9, A11, B5.1 Date: 03/24/2011 Location(s): Bellevue, Washington Office(s): Energy Efficiency and Renewable Energy March 22, 2011 EIS-0245-SA-03: Supplement Analysis Determination Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, WA March 22, 2011 EIS-0422: Notice of Availability of the Record of Decision Central Ferry to Lower Monumental 500-kilovolt Transmission Line Project

50

WA_1993_040_REGENTS_OF_THE_UNIVERSITY_OF_CALIFORNIA_Waiver_o...  

Broader source: Energy.gov (indexed) [DOE]

WA1993040REGENTSOFTHEUNIVERSITYOFCALIFORNIAWaivero.pdf WA1993040REGENTSOFTHEUNIVERSITYOFCALIFORNIAWaivero.pdf WA1993040REGENTSOFTHEUNIVERSITYOFCALIFORNI...

51

WA_00_030_ASE_AMERICAS_Request_to_Assign_Title_to_Waiver-Inv...  

Broader source: Energy.gov (indexed) [DOE]

WA1995019DONNELLYCORPORATIONWaiverofDomesticandFore.pdf WA1995018OPTICALCOATINGLABORATORYINCWaiverofDomesti.pdf WA03032RWESCHOTTSOLARINCWaiverof...

52

INSTABILITY C S Bretherton, University of Washington, Seattle, WA,  

E-Print Network [OSTI]

on small- amplitude (linear) two-dimensional inviscid hydro- static motions of a nonrotating atmosphere are neglected. Classically, a linear stability analysis of a small-amplitude wave is used to assess

Bretherton, Chris

53

Category:Yakima, WA | Open Energy Information  

Open Energy Info (EERE)

Yakima, WA Yakima, WA Jump to: navigation, search Go Back to PV Economics By Location Media in category "Yakima, WA" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Yakima WA Puget Sound Energy Inc.png SVFullServiceRestauran... 61 KB SVHospital Yakima WA Puget Sound Energy Inc.png SVHospital Yakima WA P... 58 KB SVLargeHotel Yakima WA Puget Sound Energy Inc.png SVLargeHotel Yakima WA... 58 KB SVLargeOffice Yakima WA Puget Sound Energy Inc.png SVLargeOffice Yakima W... 58 KB SVMediumOffice Yakima WA Puget Sound Energy Inc.png SVMediumOffice Yakima ... 57 KB SVMidriseApartment Yakima WA Puget Sound Energy Inc.png SVMidriseApartment Yak... 59 KB SVOutPatient Yakima WA Puget Sound Energy Inc.png SVOutPatient Yakima WA... 63 KB SVPrimarySchool Yakima WA Puget Sound Energy Inc.png

54

Application of a modified denitrifying bacteria method for analyzing groundwater and vadose zone pore water nitrate at the Hanford Site, WA, USA.  

E-Print Network [OSTI]

zone pore water nitrate at the Hanford Site, WA, USA. Woods,and Conrad, Mark The Hanford Site in southern WashingtonL have been reported for Hanford groundwaters, where nitrate

Woods, Katharine N.; Singleton, Michael J.; Conrad, Mark

2003-01-01T23:59:59.000Z

55

Manager Helps Washington County Develop Energy Efficiency Projects |  

Broader source: Energy.gov (indexed) [DOE]

Manager Helps Washington County Develop Energy Efficiency Projects Manager Helps Washington County Develop Energy Efficiency Projects Manager Helps Washington County Develop Energy Efficiency Projects August 11, 2010 - 1:01pm Addthis An Energy Department grant funded Autumn Salamack's new job as resource conservation manager for Kitsap County, Washington, and the energy efficient windows framed behind her. | Photo courtesy of Kitsap County, WA | An Energy Department grant funded Autumn Salamack's new job as resource conservation manager for Kitsap County, Washington, and the energy efficient windows framed behind her. | Photo courtesy of Kitsap County, WA | Maya Payne Smart Former Writer for Energy Empowers, EERE Autumn Salamack's career moved in a welcome new direction when she became the resource conservation manager for Kitsap County, Washington, in

56

GRR/Section 9-WA-a - State Environmental Overview | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 9-WA-a - State Environmental Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-WA-a - State Environmental Overview 9-WA-a - State Environmental Overview.pdf Click to View Fullscreen Triggers None specified The Washington State Environmental Policy Act (SEPA), chapter 43.21 RCW, requires all governmental agencies to consider the environmental impacts of a proposal before making decisions. Washington uses an Environmental Checklist and Environmental Review (ER) to provide information to help government agencies identify impacts from their proposals and determine whether an Environmental Impact Statement (EIS) is necessary.

57

GRR/Section 11-WA-b - Human Remains Process | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 11-WA-b - Human Remains Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-WA-b - Human Remains Process 11-WA-b - Human Remains Process (1).pdf Click to View Fullscreen Triggers None specified This flowchart illustrates the necessary procedure when a developer discovers human remains on a project site. In Washington, every person has the duty to notify the coroner upon the discovery of any human remains in the most expeditious manner possible. The Washington Department of Archaeology and Historic Preservation (DAHP) handles the disposition of non-forensic remains, while the county coroner handles the disposition of

58

EIS-0467: Hanford Site Natural Gas Pipeline, Richland, WA | Department of  

Broader source: Energy.gov (indexed) [DOE]

7: Hanford Site Natural Gas Pipeline, Richland, WA 7: Hanford Site Natural Gas Pipeline, Richland, WA EIS-0467: Hanford Site Natural Gas Pipeline, Richland, WA Summary This EIS will evaluate the environmental impacts of a proposal to enter into a contract with a licensed natural gas supplier in Washington State to construct, operate, and maintain a natural gas pipeline. The pipeline would deliver natural gas to support the Waste Treatment Plant and the 242-A Evaporator operations in the 200 East Area of the Hanford Site. Public Comment Opportunities None available at this time. For more information, contact: Mr. Douglas Chapin, NEPA Document Manager U.S. Department of Energy Richland Operations Office P.O. Box 550, MSIN A5-11 Richland, WA 99352 Documents Available for Download January 23, 2012 EIS-0467: Notice of Intent to Prepare an Environmental Impact Statement and

59

GRR/Section 9-WA-c - State Environmental Impact Statement | Open Energy  

Open Energy Info (EERE)

GRR/Section 9-WA-c - State Environmental Impact Statement GRR/Section 9-WA-c - State Environmental Impact Statement < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-WA-c - State Environmental Impact Statement 9-WA-c - State Environmental Impact Statement.pdf Click to View Fullscreen Triggers None specified The primary purpose of an Environmental Impact Statement (EIS) is to ensure that the Washington State Environmental Policy Act (SEPA) policies are an integral part of the ongoing programs and actions of state and local government. An EIS must provide impartial discussion of significant environmental impacts and must inform decision makers and the public of reasonable alternatives, including mitigation measures that would avoid or minimize adverse impacts or enhance environmental quality. WAC 197-11-400.

60

GRR/Section 11-WA-a - State Cultural Considerations Overview | Open Energy  

Open Energy Info (EERE)

GRR/Section 11-WA-a - State Cultural Considerations Overview GRR/Section 11-WA-a - State Cultural Considerations Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-WA-a - State Cultural Considerations Overview 11-WA-a - State Cultural Considerations Overview.pdf Click to View Fullscreen Triggers None specified The developer will be required to comply with Washington state law when human remains or other cultural resources are discovered on a project site. Cultural resources include both historic and archaeological resources and sites. The discovery of cultural resources may require obtaining a permit and providing public notice and notice to Indian Tribes. Once the necessary procedures have been followed, the developer may continue with the project.

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

RAPID/Roadmap/18-NV-c | Open Energy Information  

Open Energy Info (EERE)

Bureau of Waste Management SW Branch Supervisor Name Jim Trent Email jtrent@ndep.nv.gov Phone 775.687.9478 Website http:ndep.nv.govbwmstaffdirectory04.htm Do I Need This...

62

RAPID/Roadmap/8-NV-d | Open Energy Information  

Open Energy Info (EERE)

8-NV-d Special Use Permit for Utilities 8-NV-d - Special Use Permit for Utilities.pdf Click to View Fullscreen Permit Overview Developers must obtain a special use permit prior to...

63

NV Energy (Southern Nevada)- Solar Hot Water Incentive Program  

Broader source: Energy.gov [DOE]

NV Energy is providing an incentive for its residential customers to install solar water heaters on their homes. As of July 26, 2013, NV Energy electric customers in Southern Nevada who own their...

64

Detachment Faulting & Geothermal Resources- Pearl Hot Spring, NV  

Broader source: Energy.gov [DOE]

Detachment Faulting & Geothermal Resources - Pearl Hot Spring, NV presentation at the April 2013 peer review meeting held in Denver, Colorado.

65

NV Energy (Southern Nevada) - Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov (indexed) [DOE]

NV Energy (Southern Nevada) - Residential Energy Efficiency Rebate NV Energy (Southern Nevada) - Residential Energy Efficiency Rebate Program NV Energy (Southern Nevada) - Residential Energy Efficiency Rebate Program < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Heat Pumps Appliances & Electronics Program Info State Nevada Program Type Utility Rebate Program Rebate Amount Refrigerator/freezer Recycling: $50 Air Conditioners: Up to $1000 Variable Speed Pool Pump: $200 '''Pool Pump and duct system rebates are temporarily suspended. Contact NV Energy for additional information on funding and program availability.''' NV Energy offers rebates for the installation of high efficiency A/C units, air source heat pumps, and pool pumps for residential customers in southern

66

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

February 12, 2003 February 12, 2003 EIS-0286: Notice of Intent Hanford Site Solid (Radioactive and Hazardous) Waste Program Environmental Impact Statement, Richland, WA February 12, 2003 EIS-0285-SA-121: Supplement Analysis Transmission System Vegetation Management Program February 10, 2003 EIS-0285-SA-120: Supplement Analysis Transmission System Vegetation Management Program, Benton County, Washington January 31, 2003 EIS-0325: EPA Notice of Availability of the Final Environmental Impact Statement Schultz-Hanford Transmission Line Project January 29, 2003 EIS-0285-SA-119: Supplement Analysis Transmission System Vegetation Management Program, Snohomish-Murray No. 1 Transmission Line January 27, 2003 EIS-0285-SA-118: Supplement Analysis Transmission System Vegetation Management Program, Holcomb-Naselle 115kV,

67

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 17, 2001 August 17, 2001 EIS-0285-SA-23: Supplement Analysis Transmission System Vegetation Management Program August 17, 2001 EIS-0285-SA-22: Supplement Analysis Transmission System Vegetation Management Program, King and Snohomish Counties, WA, in the Snohomish Region August 14, 2001 EIS-0265-SA-59: Supplement Analysis Watershed Management Program August 7, 2001 EIS-0265-SA-58: Supplement Anlalysis Watershed Program - Asotin Creek Channel, Floodplain and Riparian Restoration August 2, 2001 EIS-0285-SA-20: Supplement Analysis Transmission System Vegetation Management Program August 1, 2001 EIS-0245-SA-02: Supplement Analysis Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, Washington July 24, 2001 EIS-0285-SA-17: Supplement Analysis Transmission System Vegetation Management Program

68

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

November 29, 2006 November 29, 2006 EIS-0183: Record of Decision Electrical Interconnection of the Windy Point Wind Energy Project June 26, 2006 EIS-0397: Notice of Intent to Prepare an Environmental Impact Statement and Notice of Floodplain and Wetlands Involvement Lyle Falls Fishway Project May 1, 2006 EIS-0384: Draft Environmental Impact Statement Chief Joseph Hatchery Program March 31, 2006 EA-1547: Finding of No Significant Impact Fast Flux Test Facility Project, Hanford Site March 1, 2006 EA-1547: Final Environmental Assessment Sodium Residual Reaction/Removal and Other Deactivation Work Activities, Fast Flux Test Facility Project, Hanford Site, Richland, Washington February 17, 2006 EIS-0391: Notice to Extend Scoping Period Tank Closure and Waste Management for the Hanford Site, Richland, WA

69

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

July 13, 2012 July 13, 2012 First of Hanford's Highly Radioactive Sludge Moved Away from River RICHLAND, Wash. - Workers have started moving highly radioactive material, called sludge, awayfrom the Columbia River, marking a significant milestone in the U. S. Department of Energy (DOE)'s cleanup of the Hanford Site in Washington State. July 9, 2012 EA-1912: Draft Environmental Assessment Midway-Benton No. 1 Rebuild Project Benton County, WA July 3, 2012 EIS-0312: Record of Decision (2012) Bonneville Power Administration Administrator's Record of Decision: Columbia Basin Fish Accords Memorandum of Agreement (MOA) with the Kalispel Tribe July 3, 2012 DOE Announces Additional Tour Seats Available: Tours of B Reactor at the Hanford Site Begin and End in Richland, Wash. RICHLAND, Wash. - The U.S. Department of Energy (DOE) has made additional

70

Seattle, Washington  

Broader source: Energy.gov [DOE]

Location: Seattle, WashingtonSeed Funding: $20 millionTarget Building Types: Residential, commercial, and institutionalWebsites: www.communitypowerworks.orgwww.seattle.gov/environment/CPWmain...

71

Category:Las Vegas, NV | Open Energy Information  

Open Energy Info (EERE)

NV" NV" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Las Vegas NV Nevada Power Co.png SVFullServiceRestauran... 63 KB SVHospital Las Vegas NV Nevada Power Co.png SVHospital Las Vegas N... 74 KB SVLargeHotel Las Vegas NV Nevada Power Co.png SVLargeHotel Las Vegas... 69 KB SVLargeOffice Las Vegas NV Nevada Power Co.png SVLargeOffice Las Vega... 68 KB SVMediumOffice Las Vegas NV Nevada Power Co.png SVMediumOffice Las Veg... 70 KB SVMidriseApartment Las Vegas NV Nevada Power Co.png SVMidriseApartment Las... 68 KB SVOutPatient Las Vegas NV Nevada Power Co.png SVOutPatient Las Vegas... 65 KB SVPrimarySchool Las Vegas NV Nevada Power Co.png SVPrimarySchool Las Ve... 69 KB SVQuickServiceRestaurant Las Vegas NV Nevada Power Co.png SVQuickServiceRestaura...

72

AMG Advanced Metallurgical Group NV | Open Energy Information  

Open Energy Info (EERE)

AMG Advanced Metallurgical Group NV AMG Advanced Metallurgical Group NV Jump to: navigation, search Name AMG Advanced Metallurgical Group NV Place Wayne, Pennsylvania Zip 19087 Product US-based specialty metals company offering metallurgical products and vacuum furnace systems; manufactures high purity polysilicon. References AMG Advanced Metallurgical Group NV[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. AMG Advanced Metallurgical Group NV is a company located in Wayne, Pennsylvania . References ↑ "AMG Advanced Metallurgical Group NV" Retrieved from "http://en.openei.org/w/index.php?title=AMG_Advanced_Metallurgical_Group_NV&oldid=342143" Categories: Clean Energy Organizations

73

Washington State Department of Natural Resources | Open Energy Information  

Open Energy Info (EERE)

Natural Resources Natural Resources Jump to: navigation, search Name Washington State Department of Natural Resources Address 1111 Washington Street SE Place Olympia, WA Zip 9850 Phone number (360) 902-1000 Website http://www.dnr.wa.gov/Pages/de References DNR Website[1] This article is a stub. You can help OpenEI by expanding it. Washington State Department of Natural Resources is an organization based in Olympia, Washington. References ↑ "DNR Website" Retrieved from "http://en.openei.org/w/index.php?title=Washington_State_Department_of_Natural_Resources&oldid=690551" Categories: Government Agencies Stubs What links here Related changes Special pages Printable version Permanent link Browse properties 429 Throttled (bot load) Error 429 Throttled (bot load)

74

GRR/Section 18-WA-b - Dangerous Waste Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 18-WA-b - Dangerous Waste Permit GRR/Section 18-WA-b - Dangerous Waste Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-WA-b - Dangerous Waste Permit 18-WA-b - Dangerous Waste Permit.pdf Click to View Fullscreen Contact Agencies Washington State Department of Ecology Regulations & Policies WAC 173-303-020 WAC 173-303-060 WAC 173-303-070 WAC 173-303-071 WAC 173-303-072 WAC 173-303-081 WAC 173-303-082 WAC 173-303-090 WAC 173-303-100 WAC 173-303-110 WAC 173-303-140 WAC 173-303-220 WAC 173-303-281 WAC 173-303-282 WAC 173-303-803 WAC 173-303-845 Triggers None specified The Washington State Department of Ecology (WSDE) oversees the permitting process for dangerous and solid waste. In Washington, a developer must obtain a permit if they handle dangerous waste and solid waste and are

75

Archive Reference Buildings by Climate Zone: 4C Seattle, Washington |  

Broader source: Energy.gov (indexed) [DOE]

C Seattle, Washington C Seattle, Washington Archive Reference Buildings by Climate Zone: 4C Seattle, Washington Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is available for reference. Current versions are also available. You can download ZIP files that contain the following: An EnergyPlus software input file (.idf) An html file showing the results from the EnergyPlus simulation (.html) A spreadsheet that summarizes the inputs and results for each location (.xls) The EnergyPlus TMY2 weather file (.epw). benchmark-v1.0_3.0-4c_wa_seattle.zip benchmark-v1.1_3.1-4c_usa_wa_seattle.zip benchmark-new-v1.2_4.0-4c_usa_wa_seattle.zip More Documents & Publications

76

Advance Patent Waiver W(A)2013-013 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

& Publications WA98023McDERMOTTTECHNOLOGYINCWaiverofDomesticandFo.pdf WA96016AIRPRODUCTSANDCHEMICALSINCWaiverofDomestic.pdf WA96004GECORPORATERESEARCHand...

77

WA_1995_018_OPTICAL_COATING_LABORATORY_INC_Waiver_of_Domesti...  

Broader source: Energy.gov (indexed) [DOE]

Publications WA1995019DONNELLYCORPORATIONWaiverofDomesticandFore.pdf WA1994034AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti.pdf WA1995009AIRPRODUCTSANDCHEMICAL...

78

WA_04_057_CHEMICAL_RESEARCH_AND_LICENSING_CO_Waiver_of_Paten...  

Broader source: Energy.gov (indexed) [DOE]

& Publications WA04064VELOCYSINCWaiverofPatentRgithsUnderaDOECo.pdf WA04063AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA04028AIRPRODUCTSANDCHEMICAL...

79

WA_98_023_McDERMOTT_TECHNOLOGY_INC_Waiver_of_Domestic_and_Fo...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

WA06013McDERMOTTTECHNOLOGYINCWaiverofPatentRightst.pdf WA00018PRAXAIRWaiveofDomesticandForeignInventionRi.pdf WA00007COMBUSTIONENGINEERINGINCW...

80

WA_02_021_H2GEN_INNOVATIONS_Waiver_of_Domestic_and_Foreign_P...  

Broader source: Energy.gov (indexed) [DOE]

WA02046QUESTAAIRTECHNOLOGIESWaiverofDomesticandFor.pdf WA02055PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf WA04034NUVERAFUELCELLSINCWaiver...

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

WA_04_009_ROCKWELL_SCIENTIFIC_CO_Wailve_of_Domestic_And_Fore...  

Broader source: Energy.gov (indexed) [DOE]

WA1995019DONNELLYCORPORATIONWaiverofDomesticandFore.pdf WA1995018OPTICALCOATINGLABORATORYINCWaiverofDomesti.pdf WA00030ASEAMERICASRequesttoAssign...

82

WA_1995_019_DONNELLY_CORPORATION_Waiver_of_Domestic_and_Fore...  

Broader source: Energy.gov (indexed) [DOE]

WA00030ASEAMERICASRequesttoAssignTitletoWaiver-Inv.pdf WA1995018OPTICALCOATINGLABORATORYINCWaiverofDomesti.pdf WA04009ROCKWELLSCIENTIFICCOWailve...

83

RAPID/Roadmap/20-NV-a | Open Energy Information  

Open Energy Info (EERE)

to obtain permission to engage in plugging or abandonment operations. 20-NV-a.3 - Conduct Plugging or Abandonment Operations The developer must conduct plugging or...

84

http://ndep.nv.gov/bapc/capp/capp.html  

National Nuclear Security Administration (NNSA)

Hazardous Substances State of Nevada Division of Environmental Protection Bureau of Air Pollution Control 901 So. Stewart St., Suite 4001 * Carson City, NV 89701 Phone: (775)...

85

GRR/Section 7-WA-a - Energy Facility Siting Process | Open Energy  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » GRR/Section 7-WA-a - Energy Facility Siting Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-WA-a - Energy Facility Siting Process 7-WA-a - Energy Facility Siting Process (1).pdf Click to View Fullscreen Contact Agencies Washington State Energy Facility Site Evaluation Council Regulations & Policies RCW 80.50.60(1) WAC 463-60 RCW 80.50.090(2) WAC 463-30-270 WAC 463-30-320 Triggers None specified Under RCW 80.50.60(1) a developer may not begin construction of a new energy facility site until they obtain Energy Facility Siting certification

86

BLM-NV-WN-ES-08-01-1310, NV-020-08-01 | Open Energy Information  

Open Energy Info (EERE)

BLM-NV-WN-ES-08-01-1310, NV-020-08-01 BLM-NV-WN-ES-08-01-1310, NV-020-08-01 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: BLM-NV-WN-ES-08-01-1310, NV-020-08-01 EA at Blue Mountain Geothermal Area for Geothermal/Power Plant Blue Mountain Geothermal Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Nevada Geothermal Power Consultant Environmental Management Associates Geothermal Area Blue Mountain Geothermal Area Project Location Nevada Project Phase Geothermal/Power Plant Techniques Development Drilling, Downhole Techniques, Drilling Techniques, Well Testing Techniques Comments Power Plant on Adjacent Private lands Time Frame (days) NEPA Process Time 380 Participating Agencies Lead Agency BLM

87

HAER No. NV-32-A Nevada Test Site, Pluto Facility, Disassembly...  

National Nuclear Security Administration (NNSA)

Flat Cane Spring Road Mercury Vicinity Nye County Nevada HAER No. NV-32-A Richard Smith, Photographer January, 1996 (Photographs NV-32-A-1 to NV-32-A-37) and February, 2000...

88

RAPID/Roadmap/11-WA-a | Open Energy Information  

Open Energy Info (EERE)

Toolkit About Bulk Transmission Geothermal Solar Tools Contribute Contact Us 11-WA-a State Cultural Considerations Overview 11-WA-a - State Cultural Considerations Overview.pdf...

89

STATE OF WASHINGTON DEPARTMENT OF COMMERCE 1011 Plum Street SE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

STATE OF WASHINGTON STATE OF WASHINGTON DEPARTMENT OF COMMERCE 1011 Plum Street SE  PO Box 42525  Olympia, Washington 98504-2525  (360) 725-4000 www.commerce.wa.gov July 33, 2013 Roland J. Risser Building Technologies Program Manager Office of Energy Efficiency and Renewable Energy U.S. Department of Energy 1000 Independence Avenue SW, Mail Stop EE-2J Washington, DC 20585-0121 RE: State Certification of Residential and Commercial Building Energy Codes Dear Mr. Risser: In compliance with Title III of the Energy Conservation and Production Act (ECPA) of 1976, as amended, this is to certify that the State of Washington has adopted the 2012 Edition, Washington State Energy Code, which meets or exceeds the 2012 version of the International Energy Conservation Code (IECC) for low-rise residential

90

Washington State Department of Archaeology and Historic Preservation | Open  

Open Energy Info (EERE)

Washington State Department of Archaeology and Historic Preservation Washington State Department of Archaeology and Historic Preservation Jump to: navigation, search Name Washington State Department of Archaeology and Historic Preservation Short Name DAHP Address 1063 South Capitol Way, Suite 106 Place Olympia, Washington Zip 98504 Phone number 360-586-3065 Website http://www.dahp.wa.gov/ References DAHP Website[1] This article is a stub. You can help OpenEI by expanding it. The Department of Archaeology and Historic Preservation is Washington's primary agency for historic preservation. This agency oversees the procedures for cultural resource discovery. References ↑ "DAHP Website" Retrieved from "http://en.openei.org/w/index.php?title=Washington_State_Department_of_Archaeology_and_Historic_Preservation&oldid=694965"

91

WA_1995_009_AIR_PRODUCTS_AND_CHEMICALS_INC_Waiver_of_Domesti...  

Broader source: Energy.gov (indexed) [DOE]

9AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti.pdf WA1995009AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti.pdf WA1995009AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti...

92

WA_96_016_AIR_PRODUCTS_AND_CHEMICALS_INC_Waiver_of_Domestic_...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

16AIRPRODUCTSANDCHEMICALSINCWaiverofDomestic.pdf WA96016AIRPRODUCTSANDCHEMICALSINCWaiverofDomestic.pdf WA96016AIRPRODUCTSANDCHEMICALSINCWaiverofDomest...

93

WA_1995_014_AIR_PRODUCTS_AND_CHEMICALS_INC_Waiver_of_Domesti...  

Broader source: Energy.gov (indexed) [DOE]

14AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti.pdf WA1995014AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti.pdf WA1995014AIRPRODUCTSANDCHEMICALSINCWaiverofDomest...

94

WA_1994_034_AIR_PRODUCTS_AND_CHEMICALS_INC_Waiver_of_Domesti...  

Broader source: Energy.gov (indexed) [DOE]

4034AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti.pdf WA1994034AIRPRODUCTSANDCHEMICALSINCWaiverofDomesti.pdf WA1994034AIRPRODUCTSANDCHEMICALSINCWaiverofDom...

95

WA_99_017_AIR_PRODUCTS_AND_CHEMICALS_Waiver_of_Domestic_and_...  

Broader source: Energy.gov (indexed) [DOE]

9017AIRPRODUCTSANDCHEMICALSWaiverofDomesticand.pdf WA99017AIRPRODUCTSANDCHEMICALSWaiverofDomesticand.pdf WA99017AIRPRODUCTSANDCHEMICALSWaiverofDomesti...

96

WA_04_028_AIR_PRODUCTS_AND_CHEMICALS_Waiver_of_patent_Rights...  

Broader source: Energy.gov (indexed) [DOE]

8AIRPRODUCTSANDCHEMICALSWaiverofpatentRights.pdf WA04028AIRPRODUCTSANDCHEMICALSWaiverofpatentRights.pdf WA04028AIRPRODUCTSANDCHEMICALSWaiverofpatentRigh...

97

WA_1993_028_ALLIANCE_ELECTRIC_COMPANY_Waiver_of_Domestic_and...  

Broader source: Energy.gov (indexed) [DOE]

3028ALLIANCEELECTRICCOMPANYWaiverofDomesticand.pdf WA1993028ALLIANCEELECTRICCOMPANYWaiverofDomesticand.pdf WA1993028ALLIANCEELECTRICCOMPANYWaiverofDomestic...

98

WA_98_006_WESTINGHOUSE_POWER_GENERATION_A_FORMER_DIVISION_OF...  

Broader source: Energy.gov (indexed) [DOE]

6WESTINGHOUSEPOWERGENERATIONAFORMERDIVISIONOF.pdf WA98006WESTINGHOUSEPOWERGENERATIONAFORMERDIVISIONOF.pdf WA98006WESTINGHOUSEPOWERGENERATIONAFORMERDIVISION...

99

WA_98_005_WESTINGHOUSE_POWER_GENERATION_A_FORMER_DIVISION_OF...  

Broader source: Energy.gov (indexed) [DOE]

5WESTINGHOUSEPOWERGENERATIONAFORMERDIVISIONOF.pdf WA98005WESTINGHOUSEPOWERGENERATIONAFORMERDIVISIONOF.pdf WA98005WESTINGHOUSEPOWERGENERATIONAFORMERDIVISION...

100

WA-TRIBE-STILLAGUAMISH TRIBE OF INDIANS  

Broader source: Energy.gov (indexed) [DOE]

WA-TRIBE-STILLAGUAMISH TRIBE OF INDIANS WA-TRIBE-STILLAGUAMISH TRIBE OF INDIANS Energy Efficiency and Conservation Block Grant Program Location: Tribe WA-TRIBE- STILLAGUAMISH TRIBE OF INDIANS WA American Recovery and Reinvestment Act: Proposed Action or Project Description The Stillaguamish Tribe proposes to expand its Stillaguamish Tribe Transit Services (STTS). For the past three years, the STTS has employed 14-passenger buses to transport clients to and from the tribal medical, dental, behavioral health and massage clinics. Often the demand-response requests that come to STTS are for one to three passengers at a time; therefore, funds are being requested to purchase a hybrid sedan to transport clients. Conditions: None Categorical Exclusion(s) Applied: A1, B1.32, B5.1 *-For the complete DOE National Environmental Policy Act regulations regarding categorical exclusions, see Subpart D of 10 CFR10 21

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

NV Energy - Energy Smart Schools Program | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

NV Energy - Energy Smart Schools Program NV Energy - Energy Smart Schools Program NV Energy - Energy Smart Schools Program < Back Eligibility Schools Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heating Appliances & Electronics Commercial Lighting Lighting Manufacturing Windows, Doors, & Skylights Program Info State Nevada Program Type Utility Rebate Program Rebate Amount varies; contact program administrator The Energy Smart Schools program helps Nevada school districts reduce energy consumption, improve learning environments, and save money by implementing energy efficiency improvements in new and existing K-12 schools. The Program helps schools identify cost-effective projects, offers

102

DOE - Office of Legacy Management -- U S Bureau of Mines Reno Station - NV  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Reno Station - Reno Station - NV 06 FUSRAP Considered Sites Site: U.S. BUREAU OF MINES RENO STATION (NV.06) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: U.S. BOM Metallurgy Research Center, Dept of the Interior NV.06-1 Location: 1605 Evans Avenue , Reno , Nevada NV.06-1 NV.06-2 Evaluation Year: 1987 NV.06-1 Site Operations: Research and development activities involving uranium. NV.06-2 Site Disposition: Eliminated - Potential for contamination remote NV.06-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NV.06-2 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to U.S. BUREAU OF MINES RENO STATION NV.06-1 - Memorandum/Checklist; Wallo to the File; Subject: U.S.

103

NV Energy, Inc. Smart Grid Project | Open Energy Information  

Open Energy Info (EERE)

NV Energy, Inc. Smart Grid Project NV Energy, Inc. Smart Grid Project Jump to: navigation, search Project Lead NV Energy, Inc. Country United States Headquarters Location Las Vegas, Nevada Recovery Act Funding $$137,877,906 Total Project Value $$275,755,812 Coverage Area Coverage Map: NV Energy, Inc. Smart Grid Project Coordinates 36.114646°, -115.172816° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[]}

104

A Deeper Look at 2NV | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Deeper Look at 2NV | National Nuclear Security Administration Deeper Look at 2NV | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > A Deeper Look at 2NV A Deeper Look at 2NV Posted By Bob Osborn, NNSA Chief Information Officer computer screens When Administrator D'Agostino extended the challenge to build a single, integrated enterprise through the OneNNSA initiative, we

105

EIS-0413: Searchlight Wind Energy Project, Searchlight, NV | Department of  

Broader source: Energy.gov (indexed) [DOE]

13: Searchlight Wind Energy Project, Searchlight, NV 13: Searchlight Wind Energy Project, Searchlight, NV EIS-0413: Searchlight Wind Energy Project, Searchlight, NV Summary The Department of the Interior's Bureau of Land Management, with DOE's Western Area Power Administration as a cooperating agency, prepared this EIS to evaluate the environmental impacts of a proposal to construct and operate 156 wind turbine generators and related facilities on public lands surrounding the town of Searchlight, Nevada. The proposal includes a substation that would be operated by Western. Public Comment Opportunities None available at this time. Documents Available for Download May 16, 2013 EIS-0413: Record of Decision Searchlight Wind Energy Project, Searchlight, NV January 15, 2013 EIS-0413: Final Environmental Impact Statement

106

NV Energy (Northern Nevada) - Residential Energy Efficiency Rebate Program  

Broader source: Energy.gov (indexed) [DOE]

NV Energy (Northern Nevada) - Residential Energy Efficiency Rebate NV Energy (Northern Nevada) - Residential Energy Efficiency Rebate Program NV Energy (Northern Nevada) - Residential Energy Efficiency Rebate Program < Back Eligibility Residential Savings Category Heating & Cooling Commercial Heating & Cooling Heating Appliances & Electronics Maximum Rebate 30% of cost Program Info State Nevada Program Type Utility Rebate Program Rebate Amount Refrigerator/freezer Recycling: $50 Furnaces: $50-$125 Boilers: $75-$100 Provider Nevada Energy - Northern '''As of November 30, 2011, furnace and boiler rebates have been suspended until further notice. View the program web site for additional details and contact information.''' NV Energy offers rebates for the installation of high efficiency stand-alone gas furnaces and gas boilers for residential customers in

107

RAPID/Roadmap/4-NV-a | Open Energy Information  

Open Energy Info (EERE)

Toolkit About Bulk Transmission Geothermal Solar Tools Contribute Contact Us 4-NV-a State Exploration Process 04NVAStateExplorationProcess (1).pdf Click to View Fullscreen Permit...

108

http://ndep.nv.gov/bwm/hazard01.htm  

National Nuclear Security Administration (NNSA)

4582 Donovan Way N. Las Vegas, NV 89081 (702) 657-2300 Regulatory Contact: Mr. Neil Smith E-mail: neil.smith@safety-kleen.com EPA ID: NVR000066837 Page 1 of 2 Nevada Division...

109

DNA-NV-030-09-03 | Open Energy Information  

Open Energy Info (EERE)

the hole will be backfilled with cuttings immediately upon extraction of the probe. Data Completion Notes 5142014 Moved page to DNA-NV-030-09-03. MB Should we move this page to...

110

NV Energy formerly Sierra Pacific Power | Open Energy Information  

Open Energy Info (EERE)

NV Energy (formerly Sierra Pacific Power) NV Energy (formerly Sierra Pacific Power) Place Reno, Nevada Zip 89520 Sector Efficiency Product Nevada-based, subsidiary of NV Energy/Sierra Pacific Resources, electric utility. NV Energy has developed energy efficiency projects. Coordinates 32.944065°, -97.578279° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.944065,"lon":-97.578279,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

111

Washington State Energy Facility Site Evaluation Council | Open Energy  

Open Energy Info (EERE)

Energy Facility Site Evaluation Council Energy Facility Site Evaluation Council Jump to: navigation, search Name Washington State Energy Facility Site Evaluation Council Short Name EFSEC Place Olympia, Washington Zip 98504 Website http://www.efsec.wa.gov/defaul References EFSEC: Energy Facility Siting Evaluation Council[1] This article is a stub. You can help OpenEI by expanding it. The Washington State Energy Facility Siting Council (EFSEC) oversees the siting process for major energy facilities in the State of Washington. EFSEC coordinates all evaluation and licensing steps for siting certain energy facilities. References ↑ "EFSEC: Energy Facility Siting Evaluation Council" Retrieved from "http://en.openei.org/w/index.php?title=Washington_State_Energy_Facility_Site_Evaluation_Council&oldid=694902

112

Washington Department of Natural Resources | Open Energy Information  

Open Energy Info (EERE)

Washington Washington Name Washington Department of Natural Resources Address 1111 Washington Street SE City, State Olympia, Washington Zip 98504-7000 Website http://www.dnr.wa.gov/Research Coordinates 47.037513°, -122.89915° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.037513,"lon":-122.89915,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

113

Washington Update  

Broader source: Energy.gov (indexed) [DOE]

Federal Energy Management Federal Energy Management Program Federal/Utility Partnership Working Group David McAndrew April 14, 2010 Providence RI Washington Update Federal Energy Management Program femp.energy.gov 3 Presentation Overview * EO 13514 - Strategic Sustainability Plans * DOE's approach * EISA section 432 update * Outreach Opportunities - Federal Energy Management Awards - Energy Empowers Campaign - GovEnergy Federal Energy Management Program femp.energy.gov 4 EO13514 Sustainability Plans Update Federal Energy Management Program femp.energy.gov 5 EO 13514 Goals In addition to GHG goals, the EO requires agencies to meet sustainability targets, including: * 30% reduction in vehicle fleet petroleum use by 2020; * 26% reduction in potable, industrial, landscaping, and agricultural water consumption by 2020;

114

Washington Update  

Broader source: Energy.gov (indexed) [DOE]

Utility Partnership Working Group (FUPWG) Utility Partnership Working Group (FUPWG) eere.energy.gov The Parker Ranch installation in Hawaii Federal Energy Management Program Federal/Utility Partnership Working Group David McAndrew October 20, 2010 Rapid City, SD Washington Update 2 | Federal Utility Partnership Working Group (FUPWG) eere.energy.gov Presentation Overview * FEMP Updates * GHG Guidance Update * EISA Section 432 Update * Mark Your Calendar 3 | Federal Utility Partnership Working Group (FUPWG) eere.energy.gov * Richard Kidd is leaving FEMP - Will become Deputy Assistant Secretary of the Army for Energy and Sustainability - Skye Schell will assume the role of interim Program Manager * Jesse Feinberg (Energetics) departed over the summer to attend grad school Columbia * Sarah Mabbitt (smabbitt@energetics.com)

115

Washington, DC'  

Office of Legacy Management (LM)

of. Energy of. Energy Washington, DC' 26585 , The Honorable Gene Eriquez .~ City Hall I55 Deer Hill Avenue + Danbury/Connecticut 06180 .. -r. - Dear Mayor Eriquez: Secretary of Energy Hazel O!Leary has .announced a knew approach -to openness in. the Department of Energy (DOE) and its communications with the public. In support of th,is initiative, we are,pleased to forward the enclosed information, related to the former Sperry Products,'.Inc. site in your jurisdiction ,that performed,work for DOE or its predecessor agencies. Th,is informatipn is provided,for your information, use, and retenti~oh. DOE's Formeily Utilized Sites Remedial Action Program is responsible for. identification of sites used by'DOE's predecessor agencies, determining their current radiological condition and,

116

Department Washington,  

Office of Legacy Management (LM)

Washington, of Energy DC 20545 Mr. Roy J. Villella, Jr. Assistant Secretary Diebold, Incorporated 818 Mulberry Road, S.E. F. 0. Box 8230 Canton, Ohio 44711-8230 Dear Mr..Villella: Enclosed is your copy of the signed consent form for the survey of those portions of the Diebold property used by the former owner, Herring Hall and Marvin Safe Company, to machine uranium rod for the Manhattan Engineer District. I have directed our contractor, Oak Ridge National Laboratory (ORNL), to coordinate the specific time and details for the visit and survey. Mr. Woodrow Cottrell, ORNL, or his representative, will be contacting you in this regard. If you have any questions regarding the survey, please call me at (301) 353-5439. Sincerely, Andrew Wallo III, Designation

117

Washington Update  

Broader source: Energy.gov (indexed) [DOE]

Federal Energy Management Program Federal Energy Management Program Federal Utility Partnership Working Group Meeting: Washington Update Dr. Timothy Unruh October 25-26, 2011 Philadelphia, PA 2 | Federal Energy Management Program eere.energy.gov Presentation Overview  Federal Government Goals and Status  FEMP Update  UESC Program Overview and Goals  Mark Your Calendar: Spring 2012 FUPWG 3 | Federal Energy Management Program eere.energy.gov FEMP's Mission FEMP provides the services, tools, and expertise to Federal agencies to help them achieve their legislated and executive ordered energy, greenhouse gas, and water goals. This is delivered through project financing services, technical assistance, and communications and training. 4 | Federal Energy Management Program eere.energy.gov

118

Anemometer Data (Wind Speed, Direction) for Quinault #3, WA (2004 - 2005) |  

Open Energy Info (EERE)

Quinault #3, WA (2004 - 2005) Quinault #3, WA (2004 - 2005) Dataset Summary Description Wind data collected from Quinault Indian Reservation in Washington from an anemometer as part of the Native American anemometer loan program. Monthly mean wind speed is available for 2004 through 2005, as is wind direction and turbulence data. Data is reported from a height of 20 m. The data was originally made available by Wind Powering America, a DOE Office of Energy Efficiency & Renewable Energy (EERE) program. A dynamic map displaying all available data from DOE anemometer loan programs is available http://www.windpoweringamerica.gov/anemometerloans/projects.asp. Source EERE Date Released December 02nd, 2010 (4 years ago) Date Updated December 02nd, 2010 (4 years ago) Keywords wind

119

EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA |  

Broader source: Energy.gov (indexed) [DOE]

855: Creston-Bell Rebuild Project, Spokane and Lincoln 855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA EA-1855: Creston-Bell Rebuild Project, Spokane and Lincoln Counties, WA Summary This EA (also known as DOE/EA-4406 or DOE/BP-4406) evaluates the potential environmental impacts from rebuilding the Creston-Bell No. 1 115-kV transmission line, including the replacement of wood poles and associated structural components and conductor and access road improvements. The 54-mile long, wood pole line extends from the Bonneville Power Administration (BPA) Creston substation to the BPA Bell substation near Spokane in Lincoln and Spokane Counties, Washington. Additional information about this project is available on the BPA website. Public Comment Opportunities None available at this time. Documents Available for Download

120

WA_98_016_ABB_POWER_T_AND_D_COMPANY_Waiver_of_Domestic_and_F...  

Broader source: Energy.gov (indexed) [DOE]

More Documents & Publications Advance Patent Waiver W(A)2011-046 Advance Patent Waiver W(A)2009-016 WA96016AIRPRODUCTSANDCHEMICALSINCWaiverofDomestic...

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Advance Patent Waiver W(A)2009-030 | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

public. Advance Patent Waiver W(A)2009-030 More Documents & Publications WA97030AIRPRODUCTSWaiverofDomesticandForeignPaten.pdf WA98001REYNOLDSMETALSCOMPANYW...

122

WA_04_085_THE_BOEING_COMPANY_Waiver_of_domestic_and_Foreign_...  

Broader source: Energy.gov (indexed) [DOE]

More Documents & Publications Advance Patent Waiver W(A)2010-018 Advance Patent Waiver W(A)2007-012 WA99017AIRPRODUCTSANDCHEMICALSWaiverofDomesticand...

123

WA_00_025_PRAXAIR_INC_Waiver_Request.pdf | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

25PRAXAIRINCWaiverRequest.pdf WA00025PRAXAIRINCWaiverRequest.pdf WA00025PRAXAIRINCWaiverRequest.pdf More Documents & Publications WA00001PRAXAIRINCWaiverofDo...

124

WA_00_035_ALCOA_INC_Waiver_of_Domestic_and_Foreign_Rights_in...  

Broader source: Energy.gov (indexed) [DOE]

& Publications WA03054HEILTRAILERINTERNATIONALWaiverofDomesticand.pdf WA00011HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf Advance Patent Waiver W(A)2010-051...

125

WA_03_054_HEIL_TRAILER_INTERNATIONAL_Waiver_of_Domestic_and_...  

Broader source: Energy.gov (indexed) [DOE]

& Publications WA00035ALCOAINCWaiverofDomesticandForeignRightsin.pdf WA00011HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf Advance Patent Waiver W(A)2010-051...

126

File:EIA-Eastern-OR-WA-BOE.pdf | Open Energy Information  

Open Energy Info (EERE)

Eastern-OR-WA-BOE.pdf Eastern-OR-WA-BOE.pdf Jump to: navigation, search File File history File usage Eastern Oregon and Washington By 2001 BOE Reserve Class Size of this preview: 776 × 600 pixels. Full resolution ‎(1,650 × 1,275 pixels, file size: 460 KB, MIME type: application/pdf) Description Eastern Oregon and Washington By 2001 BOE Reserve Class Sources Energy Information Administration Authors Samuel H. Limerick; Lucy Luo; Gary Long; David F. Morehouse; Jack Perrin; Robert F. King Related Technologies Oil, Natural Gas Creation Date 2005-09-01 Extent Regional Countries United States UN Region Northern America States Oregon, Washington File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 18:00, 20 December 2010 Thumbnail for version as of 18:00, 20 December 2010 1,650 × 1,275 (460 KB) MapBot (Talk | contribs) Automated bot upload

127

RAPID/Roadmap/4-WA-a | Open Energy Information  

Open Energy Info (EERE)

4-WA-a State Exploration Process 4-WA-a State Exploration Process.pdf Click to View Fullscreen Permit Overview Developers desiring to conduct geothermal exploration activities on...

128

RAPID/Roadmap/3-WA-b | Open Energy Information  

Open Energy Info (EERE)

needs access to state lands for exploratory purposes, then they should begin the State Exploration Process. Green arrow.PNG 4-WA-a: State Exploration Process 3-WA-b.3 to...

129

RAPID/Roadmap/19-WA-f | Open Energy Information  

Open Energy Info (EERE)

9-WA-f Water Well NOI for Replacement or Additional Wells 19-WA-f - Water Well NOI for Replacement or Additional Wells.pdf Click to View Fullscreen Permit Overview A developer...

130

RECIPIENT:WA Dept. of Commerce STATE: WA PROJECT SEP ARRA SIRTI -  

Broader source: Energy.gov (indexed) [DOE]

WA Dept. of Commerce STATE: WA WA Dept. of Commerce STATE: WA PROJECT SEP ARRA SIRTI - Demand Energy - Energy Storage System Tied to Solar on Commercial Facility TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA-0000052 DE-EEOOO0139 GFO-o000139-031 Based on my review ofthe information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), I have made the following determination: CX, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

131

Olympia, Washington: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Olympia, Washington: Energy Resources Olympia, Washington: Energy Resources (Redirected from Olympia, WA) Jump to: navigation, search Equivalent URI DBpedia Coordinates 47.0378741°, -122.9006951° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.0378741,"lon":-122.9006951,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

132

Spokane, Washington: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Spokane, Washington: Energy Resources Spokane, Washington: Energy Resources (Redirected from Spokane, WA) Jump to: navigation, search Equivalent URI DBpedia Coordinates 47.6587802°, -117.4260466° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.6587802,"lon":-117.4260466,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

133

Kirkland, Washington: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Kirkland, Washington: Energy Resources Kirkland, Washington: Energy Resources (Redirected from Kirkland, WA) Jump to: navigation, search Equivalent URI DBpedia Coordinates 47.6814875°, -122.2087353° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.6814875,"lon":-122.2087353,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

134

NV-020-06-EA-12 | Open Energy Information  

Open Energy Info (EERE)

NV-020-06-EA-12 NV-020-06-EA-12 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: NV-020-06-EA-12 DNA at {{{GeothermalArea}}} for Geothermal/Exploration, {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant GERLACH GEOTHERMAL LLC Geothermal Area {{{GeothermalArea}}}"{{{GeothermalArea}}}" cannot be used as a page name in this wiki. Project Location Project Phase Geothermal/Exploration Techniques Thermal Gradient Holes Comments Evidence of bond requested but never received. File closed without action. Time Frame (days) Application Time 14 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office

135

NV Energy (Northern Nevada) - Solar Hot Water Incentive Program |  

Broader source: Energy.gov (indexed) [DOE]

NV Energy (Northern Nevada) - Solar Hot Water Incentive Program NV Energy (Northern Nevada) - Solar Hot Water Incentive Program NV Energy (Northern Nevada) - Solar Hot Water Incentive Program < Back Eligibility Commercial Fed. Government Local Government Nonprofit Residential Schools State Government Savings Category Heating & Cooling Solar Water Heating Maximum Rebate Residential electric customers: Lesser of 50% or $2,000 Residential gas customers: Lesser of 30% or $3,000 Small commercial gas customers: Lesser of 30% or $7,500 Nonprofits, schools and other public gas customers: Lesser of 50% or $30,000 Program Info Start Date 2/1/2011 State Nevada Program Type Utility Rebate Program Rebate Amount Residential electric customers: Lesser of 50% or $2,000 Residential gas customers: $14.50 per therm Small commercial gas customers: $14.50 per therm

136

Remote Sensing For Geothermal Exploration Over Buffalo Valley, Nv | Open  

Open Energy Info (EERE)

Sensing For Geothermal Exploration Over Buffalo Valley, Nv Sensing For Geothermal Exploration Over Buffalo Valley, Nv Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Journal Article: Remote Sensing For Geothermal Exploration Over Buffalo Valley, Nv Details Activities (1) Areas (1) Regions (0) Abstract: Remote sensing is a useful tool for identifying the surface expression of geothermal systems based on characteristic mineral assemblages that result from hydrothermal alteration (Kratt et al., 2004; Vaughan et al., 2005). Buffalo Valley in Pershing and Lander Counties, Nevada, is an area of high potential for geothermal energy production (Shevenell et al., 2004). Geothermal heat is expressed by several hot springs with surface temperatures of up to 79°C (Olmsted et al., 1975). The hot springs and a chain of Quaternary cinder cones appear to be

137

NV-063-EA06-098 | Open Energy Information  

Open Energy Info (EERE)

NV-063-EA06-098 NV-063-EA06-098 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: NV-063-EA06-098 EA at Reese River Geothermal Area for Geothermal/Exploration Reese River Valley Geothermal Exploration Project Environmental Assessment General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Sierra Geothermal Power Geothermal Area Reese River Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Slim Holes, Thermal Gradient Holes Time Frame (days) Application Time 142 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Battle Mountain Managing Field Office BLM Mount Lewis Field Office Funding Agencies none provided

138

NV-020-08-CX-65 | Open Energy Information  

Open Energy Info (EERE)

NV-020-08-CX-65 NV-020-08-CX-65 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: NV-020-08-CX-65 CX at Desert Peak Geothermal Area for Geothermal/Exploration, Vibroseis seismic survey at Desert Peak Geothermal site General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Ormat Technologies Inc Geothermal Area Desert Peak Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Passive Seismic Techniques Time Frame (days) Application Time 15 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office none provided Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates

139

NV-EA-030-07-05 | Open Energy Information  

Open Energy Info (EERE)

NV-EA-030-07-05 NV-EA-030-07-05 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: NV-EA-030-07-05 EA at Salt Wells Geothermal Area for Geothermal/Exploration Salt Wells Geothermal Drilling EA General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Vulcan Power Company Consultant Tetra Tech, Inc., EMPSi Geothermal Area Salt Wells Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Thermal Gradient Holes Time Frame (days) Application Time 158 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates

140

Energies Nouvelles et Environnement NV ENE | Open Energy Information  

Open Energy Info (EERE)

Energies Nouvelles et Environnement NV ENE Energies Nouvelles et Environnement NV ENE Jump to: navigation, search Name Energies Nouvelles et Environnement NV (ENE) Place Brussels, Belgium Zip B-1150 Sector Solar Product Producer of photovoltaic solar power systems for space and terrestrial use. Coordinates 50.848385°, 4.349685° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":50.848385,"lon":4.349685,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Advance Patent Waiver W(A)2011-011 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

W(A)2011-011 More Documents & Publications Advance Patent Waiver W(A)2008-011 Advance Patent Waiver W(A)2008-045 WA07038POETPROJECTLIBERTYLLCWaiverofDomesticandFo...

142

Advance Patent Waiver W(A)2005-006 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

W(A)2005-006 More Documents & Publications Advance Patent Waiver W(A)2008-022 WA04079PRAXAIRINCWaiverofPatentRightsUnderaSubcon.pdf Advance Patent Waiver W(A)2011-063...

143

Advance Patent Waiver W(A)2002-023 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2-023 Advance Patent Waiver W(A)2002-023 Advance Patent Waiver W(A)2002-023 More Documents & Publications Advance Patent Waiver W(A)2006-028 WA05056IBMWATSONRESEARCHCENTERWa...

144

NV-020-07-EA-01 | Open Energy Information  

Open Energy Info (EERE)

EA-01 EA-01 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: NV-020-07-EA-01 EA at Jersey Valley Geothermal Area for Geothermal/Well Field, Geothermal/Exploration, Jersey Valley Geothermal Exploration Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Ormat Technologies Inc Consultant Environmental Management Associates Geothermal Area Jersey Valley Geothermal Area Project Location Near Fallon, NV Project Phase Geothermal/Well Field, Geothermal/Exploration Techniques Drilling Techniques, Observation Wells Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office none provided

145

WA_-01_001_PHILLIPS_PETROLEUM_Waiver_of_Domestic_and_Foreign...  

Broader source: Energy.gov (indexed) [DOE]

-01001PHILLIPSPETROLEUMWaiverofDomesticandForeign.pdf WA-01001PHILLIPSPETROLEUMWaiverofDomesticandForeign.pdf WA-01001PHILLIPSPETROLEUMWaiverofDomesticand...

146

WA_07_038_POET_PROJECT_LIBERTY_LLC_Waiver_of_Domestic_and_Fo...  

Broader source: Energy.gov (indexed) [DOE]

7038POETPROJECTLIBERTYLLCWaiverofDomesticandFo.pdf WA07038POETPROJECTLIBERTYLLCWaiverofDomesticandFo.pdf WA07038POETPROJECTLIBERTYLLCWaiverofDomestic...

147

WA_1993_041_ROCKETDYNE_AND_LLNL_Waiver_of_the_Governments_U.pdf...  

Broader source: Energy.gov (indexed) [DOE]

1ROCKETDYNEANDLLNLWaiveroftheGovernmentsU.pdf WA1993041ROCKETDYNEANDLLNLWaiveroftheGovernmentsU.pdf WA1993041ROCKETDYNEANDLLNLWaiveroftheGovernmentsU.pd...

148

WA_1993_042_UNITED_TECHNOLOGIES_CORPORATION_Waiver_of_the_Go...  

Broader source: Energy.gov (indexed) [DOE]

TIONWaiveroftheGo.pdf More Documents & Publications WA1993040REGENTSOFTHEUNIVERSITYOFCALIFORNIAWaivero.pdf WA1993041ROCKETDYNEANDLLNLWaiveroftheGovernmentsU...

149

WA_99_015_FORD_MOTOR_COMPANY_Waiver_of_Domestic_and_Foreign_...  

Broader source: Energy.gov (indexed) [DOE]

COMPANYWaiverofDomesticandForeign.pdf More Documents & Publications WA97038FORDMOTORCOMPANYWaiverofDomesticandForeign.pdf WA98008GENERALELECTRICCOMPANYWaive...

150

WA_99_022_AIR_PRODUCTS_AND_CHEMICAL_Waiver_of_Domestic_and_F...  

Broader source: Energy.gov (indexed) [DOE]

9022AIRPRODUCTSANDCHEMICALWaiverofDomesticandF.pdf WA99022AIRPRODUCTSANDCHEMICALWaiverofDomesticandF.pdf WA99022AIRPRODUCTSANDCHEMICALWaiverofDomestic...

151

WA_02_015_AIR_PRODUCTS_AND_CHEMICALS_INC_Waiver_of_Patent_Ri...  

Broader source: Energy.gov (indexed) [DOE]

15AIRPRODUCTSANDCHEMICALSINCWaiverofPatentRi.pdf WA02015AIRPRODUCTSANDCHEMICALSINCWaiverofPatentRi.pdf WA02015AIRPRODUCTSANDCHEMICALSINCWaiverofPatent...

152

WA_04_063_AIR_PRODUCTS_AND_CHEMICALS_Waiver_of_Patent_Rights...  

Broader source: Energy.gov (indexed) [DOE]

63AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA04063AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA04063AIRPRODUCTSANDCHEMICALSWaiverofPatentRig...

153

WA_04_083_AIR_PRODUCTS_AND_CHEMICALS_Waiver_of_Patent_Rights...  

Broader source: Energy.gov (indexed) [DOE]

83AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA04083AIRPRODUCTSANDCHEMICALSWaiverofPatentRights.pdf WA04083AIRPRODUCTSANDCHEMICALSWaiverofPatentRig...

154

WA_01_005__PRAXAIR_INC_Waiver_of_Domestic_and_Foreign_patent...  

Broader source: Energy.gov (indexed) [DOE]

1005PRAXAIRINCWaiverofDomesticandForeignpatent.pdf WA01005PRAXAIRINCWaiverofDomesticandForeignpatent.pdf WA01005PRAXAIRINCWaiverofDomesticandForeign...

155

WA_01_022_PRAXAIR_INC_AND_BP_AMOCO_Waiver_of_Domestic_and_Fo...  

Broader source: Energy.gov (indexed) [DOE]

1022PRAXAIRINCANDBPAMOCOWaiverofDomesticandFo.pdf WA01022PRAXAIRINCANDBPAMOCOWaiverofDomesticandFo.pdf WA01022PRAXAIRINCANDBPAMOCOWaiverofDomestic...

156

WA_03_018_HONEYWELL_INTERNATIONAL_Waiver_of_Domestic_and_For...  

Broader source: Energy.gov (indexed) [DOE]

3018HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf WA03018HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf WA03018HONEYWELLINTERNATIONALWaiverofDomestica...

157

WA_02_028_TRANE_CO__Waiver_of_Domestic_and_Foreign_Rights_in...  

Broader source: Energy.gov (indexed) [DOE]

5YORKINTERNATIONALCORPORATIONWaiverofDomesti.pdf WA01034INGERSOLL-RANDENERGYSYSTEMSWaiverofDomestica.pdf WA01011HONEYWELLLABORATORIESWaiverofDomesticandFore...

158

WA_04_040_HONEYWELL_INTERNATIONAL_INC_Waiver_of_Patent_Right...  

Broader source: Energy.gov (indexed) [DOE]

40HONEYWELLINTERNATIONALINCWaiverofPatentRight.pdf WA04040HONEYWELLINTERNATIONALINCWaiverofPatentRight.pdf WA04040HONEYWELLINTERNATIONALINCWaiverofPatentRi...

159

WA_03_041_HONEYWELL_INTERNATIONAL_Waiver_of_Domestic_and_For...  

Broader source: Energy.gov (indexed) [DOE]

3041HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf WA03041HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf WA03041HONEYWELLINTERNATIONALWaiverofDomestica...

160

WA_01_011_HONEYWELL_LABORATORIES_Waiver_of_Domestic_and_Fore...  

Broader source: Energy.gov (indexed) [DOE]

11HONEYWELLLABORATORIESWaiverofDomesticandFore.pdf WA01011HONEYWELLLABORATORIESWaiverofDomesticandFore.pdf WA01011HONEYWELLLABORATORIESWaiverofDomesticandF...

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

WA_00_011_HONEYWELL_INTERNATIONAL_Waiver_of_Domestic_and_For...  

Broader source: Energy.gov (indexed) [DOE]

0011HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf WA00011HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf WA00011HONEYWELLINTERNATIONALWaiverofDomestica...

162

WA_00_010_ROCKWELL_SCIENCE_CENTER_A_Subcontractor_of_SILICON...  

Broader source: Energy.gov (indexed) [DOE]

NTERASubcontractorofSILICON.pdf More Documents & Publications WA03011ROCKWELLAUTOMATIONWaiverofPatentRightsUnder.pdf WA01034INGERSOLL-RANDENERGYSYSTEMSWaiverof...

163

WA_04_034_NUVERA_FUEL_CELLS_INC_Waiver_of_Domestic_and_Forei...  

Broader source: Energy.gov (indexed) [DOE]

34NUVERAFUELCELLSINCWaiverofDomesticandForei.pdf WA04034NUVERAFUELCELLSINCWaiverofDomesticandForei.pdf WA04034NUVERAFUELCELLSINCWaiverofDomesticandFo...

164

WA_04_041_NUVERA_FUEL_CELLS_INC_Waiver_of_Domestic_and_Forei...  

Broader source: Energy.gov (indexed) [DOE]

41NUVERAFUELCELLSINCWaiverofDomesticandForei.pdf WA04041NUVERAFUELCELLSINCWaiverofDomesticandForei.pdf WA04041NUVERAFUELCELLSINCWaiverofDomesticandFo...

165

DOE - Office of Legacy Management -- Titanium Metals Corp Div of NLO - NV  

Office of Legacy Management (LM)

Titanium Metals Corp Div of NLO - Titanium Metals Corp Div of NLO - NV 07 FUSRAP Considered Sites Site: TITANIUM METALS CORP., DIV. OF NLO (NV.07 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Henderson , Nevada NV.07-1 Evaluation Year: 1994 NV.07-1 Site Operations: Experimental work on electrolyzing uranium contaminated magnesium fluoride. NV.07-2 Site Disposition: Eliminated - Potential for contamination considered remote NV.07-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NV.07-2 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to TITANIUM METALS CORP., DIV. OF NLO NV.07-1 - DOE Memorandum; Williams to the File; Elimination of the

166

Determining factors for Eurasian watermilfoil (M. spicatum) spread in and around Lake Tahoe, CA-NV  

E-Print Network [OSTI]

in and around Lake Tahoe, CA-NV Bruce Kendall Associatein New York State and Tahoe in CA-NV and subsequently thefor biological uptake), K+, Ca+2, Mg+2, Fe, and Mn. The

Kendall, Bruce E.; MacIntyre, Sally

2008-01-01T23:59:59.000Z

167

RAPID/Roadmap/15-WA-b | Open Energy Information  

Open Energy Info (EERE)

and Instructions Washington Environmental Permit Handbook - Air Operating Permit Air Operating Permit Register Washington Pollution Control Hearing Board Print PDF...

168

BayWa Group | Open Energy Information  

Open Energy Info (EERE)

BayWa Group BayWa Group Jump to: navigation, search Name BayWa Group Place Munich, Germany Zip 81925 Sector Services, Solar Product Germany-based company with international operations specialised in wholesale and retail and in providing services. The company is also active in the biofuel and solar sectors. Coordinates 48.136415°, 11.577531° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.136415,"lon":11.577531,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

169

NV: Nessus Vulnerability Visualization for the Web Lane Harrison  

E-Print Network [OSTI]

NV: Nessus Vulnerability Visualization for the Web Lane Harrison Oak Ridge National Laboratory Oak Ridge TN, USA harrisonlt@ornl.gov Riley Spahn Oak Ridge National Laboratory Oak Ridge TN, USA spahnrb1@ornl.gov Mike Iannacone Oak Ridge National Laboratory Oak Ridge TN, USA iannaconemd@ornl.gov Evan

Kaiser, Gail E.

170

Translational genomics of Vegetable Crops Las Vegas, NV  

E-Print Network [OSTI]

Translational genomics of Vegetable Crops Las Vegas, NV July 21, 2005 David Francis and Allen Van Deynze At the recent ASHS meetings in Las Vegas, a workshop "Translational Genomics of Vegetable Crops interventions" (Minna and Gazdar, 1996). In applied plant science, "translational genomics" implies

Douches, David S.

171

,"Washington Natural Gas Underground Storage Capacity (MMcf)"  

U.S. Energy Information Administration (EIA) Indexed Site

Annual",2012 Annual",2012 ,"Release Date:","12/12/2013" ,"Next Release Date:","1/7/2014" ,"Excel File Name:","n5290wa2a.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/n5290wa2a.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 5:30:26 PM" "Back to Contents","Data 1: Washington Natural Gas Underground Storage Capacity (MMcf)" "Sourcekey","N5290WA2" "Date","Washington Natural Gas Underground Storage Capacity (MMcf)" 32324,36400 32689,36400 33054,32100 33419,34100 33785,34100

172

,"Washington Natural Gas Underground Storage Capacity (MMcf)"  

U.S. Energy Information Administration (EIA) Indexed Site

Monthly","9/2013" Monthly","9/2013" ,"Release Date:","12/12/2013" ,"Next Release Date:","1/7/2014" ,"Excel File Name:","n5290wa2m.xls" ,"Available from Web Page:","http://tonto.eia.gov/dnav/ng/hist/n5290wa2m.htm" ,"Source:","Energy Information Administration" ,"For Help, Contact:","infoctr@eia.doe.gov" ,,"(202) 586-8800",,,"12/12/2013 5:30:26 PM" "Back to Contents","Data 1: Washington Natural Gas Underground Storage Capacity (MMcf)" "Sourcekey","N5290WA2" "Date","Washington Natural Gas Underground Storage Capacity (MMcf)" 37271,37300 37302,37300 37330,37300 37361,37300

173

Effects of postfire seeding and fertilizing on hillslope erosion in north-central Washington, USA  

E-Print Network [OSTI]

Effects of postfire seeding and fertilizing on hillslope erosion in north-central Washington, USA P, Rocky Mountain Research Station, 1221 South Main Street, Moscow, ID 83843, USA b U.S. Department of Agriculture, Forest Service, Okanogan-Wenatchee National Forest, 215 Melody Lane, Wenatchee, WA 98801, USA

Flury, Markus

174

Washington's power supply collapse  

Science Journals Connector (OSTI)

... ON 25 July 1983 the Washington Public Power Supply System (WPPSS) defaulted on 2,250 million of municipal revenue bonds. This, ... has been polemical and accusatory in nature, blaming the Washington State Supreme Court, the Bonneville ...

Roger H. Bezdek

1985-09-26T23:59:59.000Z

175

BayWa Sunways JV | Open Energy Information  

Open Energy Info (EERE)

Sunways JV Jump to: navigation, search Name: BayWa & Sunways JV Place: Germany Sector: Solar Product: Germany-based JV that specialises in developing, planning and realizing...

176

RAPID/Roadmap/14-WA-b | Open Energy Information  

Open Energy Info (EERE)

RAPID Regulatory and Permitting Information Desktop Toolkit BETA RAPID Toolkit About Bulk Transmission Geothermal Solar Tools Contribute Contact Us 14-WA-b NPDES Permit...

177

Fourth Annual SECA Meeting - Seattle, WA  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fourth Annual SECA Meeting - Seattle, WA Fourth Annual SECA Meeting - Seattle, WA April 15-16, 2003 Table of Contents Disclaimer Papers and Presentations Expanded Applications of SECA Fuel Cells SECA Industrial Team Reports Military Applications of Fuel Cells Technology Highlights Environmental Considerations Disclaimer This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government or any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

178

NV Energy Sierra Pacific Resources | Open Energy Information  

Open Energy Info (EERE)

Resources Resources Jump to: navigation, search Name NV Energy/Sierra Pacific Resources Place Reno, Nevada Zip 89511 Product Sierra Pacific Resources is a holding company whose principal subsidiary is NV Energy (formerly the separate entities Nevada Power Company and Sierra Pacific Power Company). Coordinates 32.944065°, -97.578279° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":32.944065,"lon":-97.578279,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

179

File:INL-geothermal-nv.pdf | Open Energy Information  

Open Energy Info (EERE)

nv.pdf nv.pdf Jump to: navigation, search File File history File usage Nevada Geothermal Resources Size of this preview: 432 × 600 pixels. Full resolution ‎(2,877 × 3,995 pixels, file size: 847 KB, MIME type: application/pdf) Description Nevada Geothermal Resources Sources Idaho National Laboratory Authors Patrick Laney; Julie Brizzee Related Technologies Geothermal Creation Date 2003-11-01 Extent State Countries United States UN Region Northern America States Nevada File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 12:42, 16 December 2010 Thumbnail for version as of 12:42, 16 December 2010 2,877 × 3,995 (847 KB) MapBot (Talk | contribs) Automated upload from NREL's "mapsearch" data

180

File:EnergyResourcePermittingNV.pdf | Open Energy Information  

Open Energy Info (EERE)

EnergyResourcePermittingNV.pdf EnergyResourcePermittingNV.pdf Jump to: navigation, search File File history File usage File:EnergyResourcePermittingNV.pdf Size of this preview: 463 × 599 pixels. Other resolution: 464 × 600 pixels. Go to page 1 2 3 4 5 6 7 8 9 10 11 Go! next page → next page → Full resolution ‎(1,275 × 1,650 pixels, file size: 97 KB, MIME type: application/pdf, 11 pages) File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 11:16, 15 October 2012 Thumbnail for version as of 11:16, 15 October 2012 1,275 × 1,650, 11 pages (97 KB) Dklein2012 (Talk | contribs) You cannot overwrite this file. Edit this file using an external application (See the setup instructions for more information) File usage

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Washington Silicon Plant Makes Way for Cheaper Solar-and Jobs |  

Broader source: Energy.gov (indexed) [DOE]

Washington Silicon Plant Makes Way for Cheaper Solar-and Jobs Washington Silicon Plant Makes Way for Cheaper Solar-and Jobs Washington Silicon Plant Makes Way for Cheaper Solar-and Jobs November 2, 2010 - 2:00pm Addthis REC Silicon received a $154 million 48C tax credit for a $1.7 billion expansion of its Moses Lake, WA, plant. | Photo courtesy of REC Silicon | REC Silicon received a $154 million 48C tax credit for a $1.7 billion expansion of its Moses Lake, WA, plant. | Photo courtesy of REC Silicon | Stephen Graff Former Writer & editor for Energy Empowers, EERE In most industries, if it's expensive to make, it's probably expensive to buy. This is particularly evident in the solar world. Refining the raw material used in photovoltaic panels, silicon, is not a cheap endeavor, and has kept the price of panels more expensive than other energy sources.

182

waTer economics. environmenTand Policy  

E-Print Network [OSTI]

41 cenTre for waTer economics. environmenTand Policy "Men and nature must work hand in hand and public policy insights for the supply, demand, management, and governance of water CWEEP pronounced `sweep' as in to survey so as to obtain a whole and continuous view of the world #12;42 waTer is a cri

Botea, Adi

183

RECIPIENT:WA Department of Commerce STATE: WA PROJECT Van Dyk Dairy Anaerobic Digester  

Broader source: Energy.gov (indexed) [DOE]

of5 of5 RECIPIENT:WA Department of Commerce STATE: WA PROJECT Van Dyk Dairy Anaerobic Digester TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-EE0000139 GF0-10-604 Based on my review oftbe information concerning the proposed action, as NEPA CompUance Officer (authorized under DOE Order 451.1A), I have made the foUowing determination: cx, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including, but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply and demand studies), and dissemination (including, but not limited to, document mailings, publication, and distribution;

184

Hanford, WA Selected as Plutonium Production Facility | National Nuclear  

National Nuclear Security Administration (NNSA)

Hanford, WA Selected as Plutonium Production Facility | National Nuclear Hanford, WA Selected as Plutonium Production Facility | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > Hanford, WA Selected as Plutonium Production Facility Hanford, WA Selected as Plutonium Production Facility January 16, 1943 Hanford, WA

185

Advance Patent Waiver W(A)2008-035 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

public. Advance Patent Waiver W(A)2008-035 More Documents & Publications WA07038POETPROJECTLIBERTYLLCWaiverofDomesticandFo.pdf Advance Patent Waiver W(A)2008-022...

186

Advance Patent Waiver W(A)2010-042 | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Waiver W(A)2010-042 More Documents & Publications Advance Patent Waiver W(A)2005-023 WA02055PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf ClassWaiverWC-2003-001.pdf...

187

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

November 9, 1995 November 9, 1995 EA-1123: Final Environmental Assessment Transfer of Normal and Low-Enriched Uranium Billets to the United Kingdom, Hanford Site, Richland, Washington October 1, 1995 EIS-0212: Final Environmental Impact Statement Safe Interim Storage of Hanford Tank Wastes, Hanford Site, Richland, Washington October 1, 1995 EIS-0173: DOE Notice of Availability of the Record of Decision Puget Power Northwest Washington Transmission Project October 1, 1995 EIS-0245: Draft Environmental Impact Statement Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, Washington May 1, 1995 EA-0984: Finding of No Significant Impact Deactivation of the N Reactor Facilities, Richland, Washington May 1, 1995 EA-0984: Final Environmental Assessment Deactivation of the N Reactor Facilities, Richland, Washington

188

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

February 25, 1994 February 25, 1994 EA-0915: Final Environmental Assessment Waste Tank Safety Program Hanford Site, Richland, Washington January 1, 1994 EIS-0194: Final Environmental Impact Statement Tenaska Washington II Generation Project, Washington September 16, 1993 EIS-0119: Record of Decision Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington December 1, 1992 EIS-0119: Final Environmental Impact Statement Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington September 1, 1992 EA-0429: Final Environmental Assessment Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington August 10, 1992 EA-0881: Finding of No Significant Impact Tank 241-c-103 Organic Vapor and Liquid Characterization and Supporting

189

EA-1096: Washington Wildlife Mitigation Projects (Programmatic), Washington  

Broader source: Energy.gov (indexed) [DOE]

6: Washington Wildlife Mitigation Projects (Programmatic), 6: Washington Wildlife Mitigation Projects (Programmatic), Washington EA-1096: Washington Wildlife Mitigation Projects (Programmatic), Washington SUMMARY This EA evaluates the environmental impacts of the proposal for the U.S. Department of Energy Bonneville Power Administration to fund the portion of the Washington Wildlife Mitigation Agreement pertaining to wildlife habitat mitigation projects to be undertaken in a cooperative effort with the Washington Department of Fish and Wildlife. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD July 30, 1996 EA-1096: Finding of No Significant Impact Washington Wildlife Mitigation Projects (Programmatic) July 30, 1996 EA-1096: Final Environmental Assessment Washington Wildlife Mitigation Projects (Programmatic)

190

WA_00_008_PLUG_POWER_Waiver_of_Patent_Rights_in_Performance_...  

Broader source: Energy.gov (indexed) [DOE]

POWERWaiverofPatentRightsinPerformance.pdf More Documents & Publications WA99012AIRPRODUCTSWaiverofPatentRightsUnderANNVO.pdf WA99022AIRPRODUCTSANDCHEMICAL...

191

WA_99_012_AIR_PRODUCTS_Waiver_of_Patent_Rights_Under_AN_NVO_...  

Broader source: Energy.gov (indexed) [DOE]

2AIRPRODUCTSWaiverofPatentRightsUnderANNVO.pdf WA99012AIRPRODUCTSWaiverofPatentRightsUnderANNVO.pdf WA99012AIRPRODUCTSWaiverofPatentRightsUnderANNV...

192

WA_1994_027_FORD_MOTOR_COMPANY_Waiver_of_Domestic_and_Foreig...  

Broader source: Energy.gov (indexed) [DOE]

2FORDMOTORCOMPANYWaiverofDomesticandForeig.pdf WA97038FORDMOTORCOMPANYWaiverofDomesticandForeign.pdf WA99012AIRPRODUCTSWaiverofPatentRightsUnderANNVO...

193

WA_00_018_PRAXAIR_Waive_of_Domestic_and_Foreign_Invention_Ri...  

Broader source: Energy.gov (indexed) [DOE]

18PRAXAIRWaiveofDomesticandForeignInventionRi.pdf WA00018PRAXAIRWaiveofDomesticandForeignInventionRi.pdf WA00018PRAXAIRWaiveofDomesticandForeignInvention...

194

WA_02_046_QUESTA_AIR_TECHNOLOGIES_Waiver_of_Domestic_and_For...  

Broader source: Energy.gov (indexed) [DOE]

IRTECHNOLOGIESWaiverofDomesticandFor.pdf More Documents & Publications WA02055PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf WA02021H2GENINNOVATIONSWaiverof...

195

WA_03_024_PRAXAIR_Waiver_of_Domestic_and_Foreign_Invention_R...  

Broader source: Energy.gov (indexed) [DOE]

24PRAXAIRWaiverofDomesticandForeignInventionR.pdf WA03024PRAXAIRWaiverofDomesticandForeignInventionR.pdf WA03024PRAXAIRWaiverofDomesticandForeignInventio...

196

WA_01_039_PRAXAIR_INC_Waiver_of_Domestic_and_Foreign_Patent_...  

Broader source: Energy.gov (indexed) [DOE]

1039PRAXAIRINCWaiverofDomesticandForeignPatent.pdf WA01039PRAXAIRINCWaiverofDomesticandForeignPatent.pdf WA01039PRAXAIRINCWaiverofDomesticandForeignP...

197

WA_02_055_PRAXAIR_Waiver_of_Domestic_and_Foreign_Patent_Righ...  

Broader source: Energy.gov (indexed) [DOE]

2055PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf WA02055PRAXAIRWaiverofDomesticandForeignPatentRigh.pdf WA02055PRAXAIRWaiverofDomesticandForeignPaten...

198

WA_00_001_PRAXAIR_INC_Waiver_of_Domestic_and_Foreign_Inventi...  

Broader source: Energy.gov (indexed) [DOE]

01PRAXAIRINCWaiverofDomesticandForeignInventi.pdf WA00001PRAXAIRINCWaiverofDomesticandForeignInventi.pdf WA00001PRAXAIRINCWaiverofDomesticandForeignInve...

199

WA_04_079_PRAXAIR_INC_Waiver_of_Patent_Rights_Under_a_Subcon...  

Broader source: Energy.gov (indexed) [DOE]

04079PRAXAIRINCWaiverofPatentRightsUnderaSubcon.pdf WA04079PRAXAIRINCWaiverofPatentRightsUnderaSubcon.pdf WA04079PRAXAIRINCWaiverofPatentRightsUndera...

200

WA_02_022_HONEYWELL_INC_Waiver_of_Domestic_and_Foreign_Inven...  

Broader source: Energy.gov (indexed) [DOE]

22HONEYWELLINCWaiverofDomesticandForeignInven.pdf WA02022HONEYWELLINCWaiverofDomesticandForeignInven.pdf WA02022HONEYWELLINCWaiverofDomesticandForeignIn...

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

WA_02_045_KENNAMETAL_INC_Waiver_of_Domestic_and_Foreign_Righ...  

Broader source: Energy.gov (indexed) [DOE]

LINCWaiverofDomesticandForeignRigh.pdf More Documents & Publications WA00011HONEYWELLINTERNATIONALWaiverofDomesticandFor.pdf WA01034INGERSOLL-RANDENERGYSYSTEMS...

202

WA_04_039_HONEYWELL_INTERNATIONAL_Waiver_of_Patent_Rights_Un...  

Broader source: Energy.gov (indexed) [DOE]

9HONEYWELLINTERNATIONALWaiverofPatentRightsUn.pdf WA04039HONEYWELLINTERNATIONALWaiverofPatentRightsUn.pdf WA04039HONEYWELLINTERNATIONALWaiverofPatentRights...

203

WA_04_007_OSHKOSH_TRUCK_CORP_Waiver_of_Patent_Rights_Under_N...  

Broader source: Energy.gov (indexed) [DOE]

WaiverofPatentRightsUnderN.pdf More Documents & Publications WA03011ROCKWELLAUTOMATIONWaiverofPatentRightsUnder.pdf WA04008GENERALMOTORSCORPWaiverofPatentRi...

204

WA_03_011_ROCKWELL_AUTOMATION_Waiver_of_Patent_Rights_Under_...  

Broader source: Energy.gov (indexed) [DOE]

3011ROCKWELLAUTOMATIONWaiverofPatentRightsUnder.pdf WA03011ROCKWELLAUTOMATIONWaiverofPatentRightsUnder.pdf WA03011ROCKWELLAUTOMATIONWaiverofPatentRights...

205

DOI-BLM-NV-B020-????-???-EA | Open Energy Information  

Open Energy Info (EERE)

B020-????-???-EA B020-????-???-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-B020-????-???-EA EA at Grass Valley Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Ormat Technologies Inc Geothermal Area Grass Valley Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Battle Mountain Managing Field Office BLM Mount Lewis Field Office Funding Agencies none provided Surface Manager none provided Mineral Manager none provided Selected Dates Relevant Numbers Lead Agency

206

EA-NV-030-05-08 | Open Energy Information  

Open Energy Info (EERE)

5-08 5-08 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: EA-NV-030-05-08 EA at Salt Wells Geothermal Area for Geothermal/Exploration Salt Wells Geothermal Plant Development Final EA General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Nevada Geothermal Specialists, LLC Consultant Tetra Tech, Inc. Geothermal Area Salt Wells Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager none provided Mineral Manager Nevada Selected Dates Application

207

NV-020-03-26 | Open Energy Information  

Open Energy Info (EERE)

6 6 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: NV-020-03-26 EA at Desert Peak Geothermal Area for Geothermal/Power Plant, Desert Peak 2 Geothermal Project Environmental Assessment General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant ORNI 3, LLC Consultant Argonne National Laboratory, Environmental Management Associates, Inc. (EMA) Geothermal Area Desert Peak Geothermal Area Project Location Nevada Project Phase Geothermal/Power Plant Techniques Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office none provided Funding Agencies none provided Surface Manager BLM, private Mineral Manager BLM

208

DOI-BLM-NV-C010-????-????-CX | Open Energy Information  

Open Energy Info (EERE)

????-????-CX ????-????-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-????-????-CX CX at Dixie Valley Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Ormat Technologies Inc Geothermal Area Dixie Valley Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Thermal Gradient Holes Comments No Doc Number- CX was never processed. Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office none provided Funding Agencies none provided Surface Manager none provided Mineral Manager none provided

209

Washington: Putting More Solar on More Rooftops in Washington...  

Energy Savers [EERE]

Putting More Solar on More Rooftops in Washington State Washington: Putting More Solar on More Rooftops in Washington State November 8, 2013 - 12:00am Addthis EERE SunShot...

210

2015 Washington Auto Show  

Broader source: Energy.gov [DOE]

Secretary of Energy Ernest Moniz attended the 2015 Washington Auto Show in Washington, DC on January 22, 2015. He delivered brief remarks on the Energy Department's role in electric and fuel cell vehicle technology, announced more than $55 million in funding opportunities to support fuel-efficient vehicle technologies and visited several of the exhibits featuring recent additions to the vehicles market.

211

2015 Washington Auto Show  

Broader source: Energy.gov [DOE]

Secretary of Energy Ernest Moniz attended the 2015 Washington Auto Show in Washington, DC on January 22, 2015. He delivered brief remarks on the Energy Department's role in electric and fuel cell vehicle technology, and visited several of the exhibits featuring recent additions to the vehicles market.

212

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 15, 2010 March 15, 2010 CX-001180: Categorical Exclusion Determination Monroe-Custer Number 1 and 2 500-Kilovolt Transmission Line Structure 16/2 Access Road Improvement and Bridge Replacement Project CX(s) Applied: B1.3 Date: 03/15/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration March 12, 2010 CX-006365: Categorical Exclusion Determination Washington-City-Spokane CX(s) Applied: A9, A11, B2.5, B5.1 Date: 03/12/2010 Location(s): Spokane, Washington Office(s): Energy Efficiency and Renewable Energy March 12, 2010 CX-006364: Categorical Exclusion Determination Washington-City-Pasco CX(s) Applied: A9, A11, B5.1 Date: 03/12/2010 Location(s): Pasco, Washington Office(s): Energy Efficiency and Renewable Energy March 12, 2010 CX-001182: Categorical Exclusion Determination

213

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

26, 2010 26, 2010 CX-003272: Categorical Exclusion Determination Washington-City-Everett CX(s) Applied: A1, A9, A11, B1.32, B5.1 Date: 07/26/2010 Location(s): Everett, Washington Office(s): Energy Efficiency and Renewable Energy July 23, 2010 EIS-0119: Amended Record of Decision Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington July 22, 2010 CX-003234: Categorical Exclusion Determination Demolition of Vacant House at Bonneville Power Administration's Ross Complex CX(s) Applied: B1.23 Date: 07/22/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration July 21, 2010 CX-003236: Categorical Exclusion Determination Augspurger Fiber Replacement Project CX(s) Applied: B1.7, B4.7 Date: 07/21/2010 Location(s): Skamania County, Washington

214

Isotopic Studies of Contaminant Transport at the Hanford Site, WA  

E-Print Network [OSTI]

MR-0132. Westinghouse Hanford Company, Richland WA. Bretz,in recharge at the Hanford Site. Northwest Science. 66:237-M.J. , ed. 2000. Hanford Site groundwater Monitoring

Christensen, J.N.; Conrad, M.E.; DePaolo, D.J.; Dresel, P.E.

2008-01-01T23:59:59.000Z

215

RAPID/Roadmap/18-WA-b | Open Energy Information  

Open Energy Info (EERE)

period in which the WSDE has to respond to the Demonstration of Compliance. 18-WA-b.17 - Conduct Public Meeting, if Requested If the public requests a public meeting on the...

216

DOI-BLM-NV-CO1000-2010-0021-CX | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-CO1000-2010-0021-CX DOI-BLM-NV-CO1000-2010-0021-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-CO1000-2010-0021-CX CX at Coyote Canyon Geothermal Area for Geothermal/Exploration, {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant TGP Dixie Development LLC Geothermal Area Coyote Canyon Geothermal Area Project Location Churchill County, NV, Churchill County, NV Project Phase Geothermal/Exploration Techniques Magnetotelluric Methods Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager Nevada Mineral Manager BLM

217

GRR/Section 7-NV-a - Permit to Construct and Permit to Operate | Open  

Open Energy Info (EERE)

7-NV-a - Permit to Construct and Permit to Operate 7-NV-a - Permit to Construct and Permit to Operate < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-NV-a - Permit to Construct and Permit to Operate 07NVAPermitToConstructAndPermitToOperate (3).pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Triggers None specified Click "Edit With Form" above to add content 07NVAPermitToConstructAndPermitToOperate (3).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative _ 7-NV-a.1 and 6-NV-a.2 - Has an Environmental Review been Completed for Construction? The developer must make sure to undergo an environmental process before

218

DOI-BLM-NV-CO1000-2010-0022-CX | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-CO1000-2010-0022-CX DOI-BLM-NV-CO1000-2010-0022-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-CO1000-2010-0022-CX CX at Coyote Canyon Geothermal Area for Geothermal/Exploration, {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Terra-Gen Power LLC Geothermal Area Coyote Canyon Geothermal Area Project Location Churchill County, NV, Churchill County, NV Project Phase Geothermal/Exploration Techniques Electromagnetic Techniques, Magnetotelluric Techniques, Seismic Techniques Time Frame (days) Application Time 213 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided

219

DOI-BLM-NV-C010-2011-0001-EA | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-C010-2011-0001-EA DOI-BLM-NV-C010-2011-0001-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2011-0001-EA EA at Coyote Canyon Geothermal Area for Geothermal/Power Plant TGP Coyote Canyon Utilization Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Terra-Gen Power LLC Consultant CH2M Hill Ltd Geothermal Area Coyote Canyon Geothermal Area Project Location Churchill County, NV, Churchill County, NV Project Phase Geothermal/Power Plant Techniques Exploration Drilling, Observation Wells, Well Testing Techniques Comments Utilization Time Frame (days) NEPA Process Time 214 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City

220

Deterministic coupling of delta-doped NV centers to a nanobeam photonic crystal cavity  

E-Print Network [OSTI]

The negatively-charged nitrogen vacancy center (NV) in diamond has generated significant interest as a platform for quantum information processing and sensing in the solid state. For most applications, high quality optical cavities are required to enhance the NV zero-phonon line (ZPL) emission. An outstanding challenge in maximizing the degree of NV-cavity coupling is the deterministic placement of NVs within the cavity. Here, we report photonic crystal nanobeam cavities coupled to NVs incorporated by a delta-doping technique that allows nanometer-scale vertical positioning of the emitters. We demonstrate cavities with Q up to ~24,000 and mode volume V ~ $0.47({\\lambda}/n)^{3}$ as well as resonant enhancement of the ZPL of an NV ensemble with Purcell factor of ~20. Our fabrication technique provides a first step towards deterministic NV-cavity coupling using spatial control of the emitters.

Jonathan C. Lee; David O. Bracher; Shanying Cui; Kenichi Ohno; Claire A. McLellan; Xingyu Zhang; Paolo Andrich; Benjamin Aleman; Kasey J. Russell; Andrew P. Magyar; Igor Aharonovich; Ania Bleszynski Jayich; David Awschalom; Evelyn L. Hu

2014-11-03T23:59:59.000Z

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Gig Harbor, Washington: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Gig Harbor, Washington: Energy Resources Gig Harbor, Washington: Energy Resources (Redirected from Gig Harbor, WA) Jump to: navigation, search Equivalent URI DBpedia Coordinates 47.329264°, -122.5801293° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.329264,"lon":-122.5801293,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

222

Friday Harbor, Washington: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Friday Harbor, Washington: Energy Resources Friday Harbor, Washington: Energy Resources (Redirected from Friday Harbor, WA) Jump to: navigation, search Equivalent URI DBpedia Coordinates 48.5342662°, -123.0171242° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":48.5342662,"lon":-123.0171242,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

223

Ocean Shores, Washington: Energy Resources | Open Energy Information  

Open Energy Info (EERE)

Ocean Shores, Washington: Energy Resources Ocean Shores, Washington: Energy Resources (Redirected from Ocean Shores, WA) Jump to: navigation, search Equivalent URI DBpedia Coordinates 46.9736986°, -124.1562852° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":46.9736986,"lon":-124.1562852,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

224

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

November 23, 2010 November 23, 2010 CX-004464: Categorical Exclusion Determination Central Ferry Area Radio Communications Project CX(s) Applied: B4.6 Date: 11/01/2010 Location(s): Franklin County, Washington Office(s): Bonneville Power Administration November 19, 2010 CX-004524: Categorical Exclusion Determination Washington State University Building Upgrades and Resource Conservation Manager CX(s) Applied: A9, A11, B5.1 Date: 11/19/2010 Location(s): Clark County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 19, 2010 CX-004525: Categorical Exclusion Determination Energy Services Corps CX(s) Applied: A9, A11, B5.1 Date: 11/19/2010 Location(s): Kitsap County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

225

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 8, 2000 March 8, 2000 EIS-0169-SA-03: Supplement Analysis Yakima Fisheries Project-Use of Washington Department of Fish and Wildlife's Yakima Hatchery and Acclimation and Research Activities, Yakima, Yakima County, Washington, Easton, Kittitas County, Washington September 15, 1999 EIS-0310: Notice of Intent to Prepare a Programmatic Environmental Impact Statement Accomplishing Expanded Civilian Nuclear Energy Research and Development and Isotope Production Missions in the United States, Including the Role of the Fast Flux Test Facility September 1, 1999 EIS-0222: Final Environmental Impact Statement Hanford Comprehensive Land-Use Plan, Hanford Site, Richland, Washington August 16, 1999 EIS-0169-SA-02: Supplement Analysis Yakima Fisheries Project-Natural Spawning Channels, Increased On-site

226

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

21, 2011 21, 2011 CX-007750: Categorical Exclusion Determination Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration December 16, 2011 Cows like these in Skagit County, Washington, supply the biodigester developed by Kevin Maas of Farm Power up to 70,000 gallons of manure per day. The newest Farm Power facility in Washington generates enough electricity to power 500 homes. Photo courtesy of sea_turtle. Farming Out Heat and Electricity through Biopower The newest biodigester at the Farm Power facility in Washington generates electricity from biogas created from bacteria's anaerobic digestion of cow

227

Washington Closure Hanford, LLC  

Office of Environmental Management (EM)

Washington 99354 WEA-201 0-02 Dear Mr. Brosee: This letter refers to the Office of Health, Safety and Security's Office of Enforcement investigation into the facts and...

228

Meeting Location: Las Vegas, NV- DOE Office at Lossee Road  

Broader source: Energy.gov (indexed) [DOE]

11 11 th EM QUALITY ASSURANCE CORPORATE BOARD MEETING Meeting Location: Las Vegas, NV- DOE Office at Lossee Road With Limited Conference Call Capabilities Room: 6404 Agenda for May 1, 2012 1:00-1:15 pm Agenda, Introductions, Status of Action Items from Last Board Meeting Bob Murray (EM-43) 1:15-1:35 pm Discussion and Summary of the Site ISM/QA Declarations Steven Ross (EM-43) 1:35-2:05 pm Status of Phase II Follow-up Reviews for Field Offices including Use and Status of the Standard Review Plan Bob Toro (EM-43) 2:05-2:35 pm Overview of EM QA Program (as provided to DNFSB) Matthew Moury (EM-40) Bob Murray (EM-43) 2:35-3:05 pm (BOARD VOTE)

229

NV-020-08-DNA-52 | Open Energy Information  

Open Energy Info (EERE)

DNA-52 DNA-52 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: NV-020-08-DNA-52 DNA at {{{GeothermalArea}}} for Geothermal/Exploration, {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Gerlach Geothermal LLC Geothermal Area {{{GeothermalArea}}}"{{{GeothermalArea}}}" cannot be used as a page name in this wiki. Project Location Project Phase Geothermal/Exploration Techniques Thermal Gradient Holes Comments NOI for TGH at Gavvs Valley Time Frame (days) Application Time 14 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office BLM Black Rock Field Office Funding Agencies none provided

230

EA-NV-030-07-006 | Open Energy Information  

Open Energy Info (EERE)

7-006 7-006 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: EA-NV-030-07-006 EA at Carson Lake Corral Geothermal Area for Geothermal/Well Field Ormat Carson Lake Geothermal Exploration Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Ormat Technologies Inc Consultant MHA Environmental Consulting, Inc. Geothermal Area Carson Lake Corral Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Exploration Drilling, Slim Holes, Thermal Gradient Holes Time Frame (days) Application Time 345 NEPA Process Time 296 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater

231

Energy Matters in Washington State  

E-Print Network [OSTI]

Energy Matters in Washington State Energy Matters in Washington State www.energy.wsu.edu/library/ November 2009 #12;905 Plum Street SE, Building 3 P.O. Box 43169 Olympia, Washington 98504-3169 Energy University Extension Energy Program. 905 Plum Street SE, Building 3, P.O. Box 43169, Olympia, Washington

Collins, Gary S.

232

DOI-BLM-NV-CO1000-2010-0010-CX | Open Energy Information  

Open Energy Info (EERE)

CX CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-CO1000-2010-0010-CX CX at Coyote Canyon Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Terra-Gen Power LLC Geothermal Area Coyote Canyon Geothermal Area Project Location Churchill County, NV, Churchill County, NV Project Phase Geothermal/Exploration Techniques Electromagnetic Techniques Time Frame (days) Application Time 209 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates

233

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

15, 2010 15, 2010 CX-001639: Categorical Exclusion Determination Transportation Demand Management on 164th S/128th SW/20th SE CX(s) Applied: A9, A11, B5.1 Date: 04/15/2010 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 15, 2010 CX-001821: Categorical Exclusion Determination SGL Automotive Carbon Limited Liability Company (LLC) CX(s) Applied: B5.1 Date: 04/15/2010 Location(s): Moses Lake, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office March 31, 2010 CX-001386: Categorical Exclusion Determination Dragoon Creek Access to Bonneville Power Administration's Bell-Boundary #3 Transmission Line to Replace Existing Bridge CX(s) Applied: B1.13, B1.3 Date: 03/31/2010 Location(s): Spokane County, Washington

234

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

25, 2010 25, 2010 CX-003611: Categorical Exclusion Determination Schultz - Raver Number 3 and 4 500-kilovolt (kV) Transmission Lines Spacer Replacement CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): King County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003610: Categorical Exclusion Determination Ross-Lexington Number 1 Access Road Repair Project CX(s) Applied: B1.3 Date: 08/25/2010 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration August 25, 2010 CX-003609: Categorical Exclusion Determination Cushman North Fork Skokomish Powerhouse CX(s) Applied: A9 Date: 08/25/2010 Location(s): Tacoma, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 25, 2010 CX-003614: Categorical Exclusion Determination

235

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1, 2011 1, 2011 CX-006066: Categorical Exclusion Determination Outdoor Tests, Experiments on Materials and Equipment Components CX(s) Applied: B3.11 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006065: Categorical Exclusion Determination Siting, Construction, Operation and Decommissioning of Microbiological and Biomedical Facilities CX(s) Applied: B3.12 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 21, 2011 CX-006064: Categorical Exclusion Determination Actions to Conserve Energy CX(s) Applied: B5.1 Date: 06/21/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 20, 2011 CX-006089: Categorical Exclusion Determination

236

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 9, 2010 September 9, 2010 CX-003832: Categorical Exclusion Determination Issaquah Highlands Zero Energy Affordable Housing CX(s) Applied: A9, B2.2, B2.5, B5.1, B6.3 Date: 09/09/2010 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory September 8, 2010 CX-003908: Categorical Exclusion Determination Fiscal Year 2010 Columbia Basin Fish Accords with Colville Confederated Tribes CX(s) Applied: B1.25 Date: 09/08/2010 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration September 8, 2010 CX-003789: Categorical Exclusion Determination Grandview-Red Mountain Number 1 Proposed Transmission Line Interconnection CX(s) Applied: B4.6 Date: 09/08/2010 Location(s): Benton County, Washington

237

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

February 15, 2011 February 15, 2011 CX-005262: Categorical Exclusion Determination Woodland and 148th Clearwire Wireless Communication Project CX(s) Applied: B1.7, B1.19 Date: 02/15/2011 Location(s): Pierce County, Washington Office(s): Bonneville Power Administration February 11, 2011 CX-005224: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 02/11/2011 Location(s): Bellevue, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory February 10, 2011 CX-005218: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 02/10/2011 Location(s): Renton, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy

238

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 30, 2009 September 30, 2009 CX-000477: Categorical Exclusion Determination Install a Photovoltaic Power Generation Array and Electric Car Charging Stations, Environmental Molecular Sciences Laboratory CX(s) Applied: B1.15 Date: 09/30/2009 Location(s): Richland, Washington Office(s): Science, Pacific Northwest Site Office September 23, 2009 CX-000476: Categorical Exclusion Determination 331 Building Irrigation Upgrades, 300 Area CX(s) Applied: B2.5 Date: 09/23/2009 Location(s): Richland, Washington Office(s): Science, Pacific Northwest Site Office September 16, 2009 EIS-0183: DOE Notice of Availability of the Record of Decision Electrical Interconnection of the Kittitas Valley Wind Project September 15, 2009 EIS-0312: Record of Decision Washington-Action Agency Estuary Habitat Memorandum of Agreement

239

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

16, 2010 16, 2010 CX-003457: Categorical Exclusion Determination Sidewall Coring of Single-Shell Tank 241-A-106 CX(s) Applied: A9, B3.1, B3.11 Date: 08/16/2010 Location(s): Richland, Washington Office(s): Environmental Management, Office of River Protection-Richland Office August 13, 2010 CX-004960: Categorical Exclusion Determination Boeing Research and Technology -Low-Cost, High-Energy Density Flywheel Storage Grid CX(s) Applied: B3.6 Date: 08/13/2010 Location(s): Kent, Washington Office(s): Advanced Research Projects Agency - Energy August 12, 2010 CX-003624: Categorical Exclusion Determination Replacement of Twenty 22-L Structures on the Satsop-Aberdeen Number 2 230-kilovolt Transmission Line CX(s) Applied: B1.3 Date: 08/12/2010 Location(s): Gray's Harbor County, Washington

240

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

May 3, 2010 May 3, 2010 CX-002190: Categorical Exclusion Determination Nisqually Indian Tribe of the Nisqually Reservation Energy Efficiency Retrofits of Tribal Center CX(s) Applied: B2.5, B5.1 Date: 05/03/2010 Location(s): Nisqually Reservation, Washington Office(s): Energy Efficiency and Renewable Energy May 3, 2010 CX-002438: Categorical Exclusion Determination Rocky Reach-Maple Valley Number-1 Transmission Line Bridge Replacement Project CX(s) Applied: B1.3 Date: 05/03/2010 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration April 30, 2010 CX-002137: Categorical Exclusion Determination Farm Power Lynden CX(s) Applied: B5.1 Date: 04/30/2010 Location(s): Lynden, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

October 13, 2010 October 13, 2010 CX-004253: Categorical Exclusion Determination Northwest Natural Devine Road Land Use Review Request CX(s) Applied: B4.9 Date: 10/13/2010 Location(s): Clark County, Washington Office(s): Bonneville Power Administration October 13, 2010 CX-004252: Categorical Exclusion Determination Replace Two Broken Transformers Near the Roza Dam Adult Trap Facility CX(s) Applied: B4.6 Date: 10/13/2010 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration October 8, 2010 EIS-0456: Final Environmental Impact Statement Cushman Hydroelectric Project (FERC Project No. 460) October 8, 2010 EIS-0456: Final Environmental Impact Statement (Appendices) Cushman Hydroelectric Project (FERC Project No. 460), Washington Comments and responses to DEIS-0456: Cushman Hydroelectric Project.

242

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

22, 2011 22, 2011 CX-006583: Categorical Exclusion Determination Wood Pole Replacement Along Portions of the Grand Coulee-Chief Joseph #1 and #2 230-Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/22/2011 Location(s): Douglas County, Washington Office(s): Bonneville Power Administration August 22, 2011 CX-006580: Categorical Exclusion Determination Wood Pole Replacement Along the Grand Coulee-Okanogan #2 115-Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13 Date: 08/22/2011 Location(s): Grant County, Washington Office(s): Bonneville Power Administration August 18, 2011 EA-1728: Draft Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington August 15, 2011 EIS-0245-SA-03: Supplement Analysis Management of Spent Nuclear Fuel from the K Basins at the Hanford Site,

243

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

20, 2011 20, 2011 CX-006817: Categorical Exclusion Determination McNary-Ross No. 1 Upgrade Project, Surface Impairment Removal CX(s) Applied: B1.3 Date: 09/20/2011 Location(s): Klickitat and Clark Counties, Washington Office(s): Bonneville Power Administration September 19, 2011 CX-006840: Categorical Exclusion Determination Security Barrier Relocation at the 618-11 Burial Grounds CX(s) Applied: B1.15 Date: 09/19/2011 Location(s): Richland, Washington Office(s): River Protection-Richland Operations Office, Golden Field Office September 19, 2011 CX-006839: Categorical Exclusion Determination Training Exercises and Simulations on the Hanford Site CX(s) Applied: B1.2 Date: 09/19/2011 Location(s): Richland, Washington Office(s): River Protection-Richland Operations Office September 16, 2011

244

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

December 17, 2010 December 17, 2010 CX-004835: Categorical Exclusion Determination Electric Vehicle Charging Stations City of Mill Creek CX(s) Applied: B5.1 Date: 12/17/2010 Location(s): Mill Creek, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office December 16, 2010 CX-004691: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 12/16/2010 Location(s): Kirkland, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 16, 2010 CX-004836: Categorical Exclusion Determination Marine and Hydrokinetic Technology Readiness Advancement Initiative CX(s) Applied: A9, B3.6 Date: 12/16/2010 Location(s): Lynnwood, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

245

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

June 30, 2010 June 30, 2010 CX-003023: Categorical Exclusion Determination Output Power Purchase Agreement with Northwest Energy Supply Cooperative - Barr-Tech, LLC Resource CX(s) Applied: B4.1 Date: 06/30/2010 Location(s): Fishtrap, Washington Office(s): Bonneville Power Administration June 30, 2010 CX-002874: Categorical Exclusion Determination Game Farm Park Energy Efficient Replacement Lighting Project CX(s) Applied: B2.5, B5.1 Date: 06/30/2010 Location(s): Auburn, Washington Office(s): Energy Efficiency and Renewable Energy June 30, 2010 CX-002873: Categorical Exclusion Determination Green House Gas Inventory CX(s) Applied: A9, A11, B5.1 Date: 06/30/2010 Location(s): Auburn, Washington Office(s): Energy Efficiency and Renewable Energy June 24, 2010 CX-002876: Categorical Exclusion Determination

246

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

May 26, 2010 May 26, 2010 CX-002564: Categorical Exclusion Determination FPE Renewables, LLC CX(s) Applied: B5.1 Date: 05/26/2010 Location(s): Lynden, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 26, 2010 CX-002557: Categorical Exclusion Determination G.R. Silicate CX(s) Applied: B5.1 Date: 05/26/2010 Location(s): Hoquiam, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 21, 2010 CX-002567: Categorical Exclusion Determination Harold LeMay Enterprises, Inc. CX(s) Applied: B5.1 Date: 05/21/2010 Location(s): Pierce County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office May 21, 2010 CX-002563: Categorical Exclusion Determination Clark Public Utilities CX(s) Applied: B5.1

247

Washington Closure Hanford, LLC  

Broader source: Energy.gov (indexed) [DOE]

August 19,2010 August 19,2010 CERTIFIED MAIL RETURN RECEIPT REQUESTED Mr. Neil Brosee President Washington Closure Hanford, LLC 2620 Fermi Avenue Richland, Washington 99354 WEA-201 0-02 Dear Mr. Brosee: This letter refers to the Office of Health, Safety and Security's Office of Enforcement investigation into the facts and circumstances surrounding the employee fall that occurred at the Hanford High Bay Testing Facility (336 Building) on July 1, 2009. The worker sustained serious injury to his back and broke bones in both legs. Based on an evaluation of the evidence in this matter, the U.S. Department of Energy (DOE) has concluded that violations of 10 C.F.R. Part 851, Worker Safety and Health Program, by Washington Closure Hanford, LLC (WCH) occurred. Accordingly, DOE is issuing the enclosed Preliminary Notice of

248

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 27, 1998 August 27, 1998 EA-1260: Finding of No Significant Impact Transfer of 1100 Area, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington August 27, 1998 EA-1260: Final Environmental Assessment and Finding of No Significant Impact Transfer of 1100 Area, Southern Rail Connection and Rolling Stock, Hanford Site, Richland, Washington August 13, 1998 EIS-0229: Notice of Availability of the Amended Record of Decision Storage and Disposition of Weapons-Usable Fissile Materials August 1, 1998 EIS-0245-SA-01: Supplement Analysis Management of Spent Nuclear Fuel from the K Basins at the Hanford Site, Richland, Washington May 1, 1998 EIS-0189: Supplement Analysis Tank Waste Remediation System July 28, 1997 EA-1203: Final Environmental Assessment Trench 33 Widening in 218-W-5 Low-level Burial Ground, Hanford Site,

249

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 30, 2010 September 30, 2010 CX-004092: Categorical Exclusion Determination Advanced Energy Efficient Building Technologies for High Performance Hospitals CX(s) Applied: A9 Date: 09/30/2010 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory September 30, 2010 CX-004074: Categorical Exclusion Determination Cascade Community Wind Mid Scale Wind Turbines CX(s) Applied: A9, B5.1 Date: 09/30/2010 Location(s): Kittitas County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office September 29, 2010 CX-004145: Categorical Exclusion Determination Advanced Low Energy Enzyme Catalyzed Solvent for Carbon Dioxide Capture CX(s) Applied: A9, B3.6 Date: 09/29/2010 Location(s): Richland, Washington

250

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

October 7, 2011 October 7, 2011 CX-006814: Categorical Exclusion Determination Columbia Rural Electric Association (Columbia REA) Dayton Substation Tap Line Project CX(s) Applied: B4.12 Date: 10/07/2011 Location(s): Dayton, Columbia County, Washington Office(s): Bonneville Power Administration September 28, 2011 CX-006957: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project - Seattle Public Utilities CX(s) Applied: B5.1 Date: 09/28/2011 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, Sandia Site Office September 26, 2011 EIS-0421: Record of Decision Big Eddy-Knight Transmission Project Wasco County, Oregon and Klickitat County, Washington September 26, 2011 CX-006843: Categorical Exclusion Determination ER52 Fire Station Warning Signals

251

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

13, 2010 13, 2010 CX-003035: Categorical Exclusion Determination Pacific Northwest Smart Grid Demonstration CX(s) Applied: A1, A9, A11, B1.7, B4.4, B5.1 Date: 07/13/2010 Location(s): Fox Island, Washington Office(s): Electricity Delivery and Energy Reliability, National Energy Technology Laboratory July 12, 2010 CX-003628: Categorical Exclusion Determination Kittitas County Conservation Easement Acquisition CX(s) Applied: B1.25 Date: 07/12/2010 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration July 12, 2010 CX-003447: Categorical Exclusion Determination Bridge and Access Road Maintenance CX(s) Applied: B1.3 Date: 07/12/2010 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration July 12, 2010 CX-003240: Categorical Exclusion Determination

252

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

July 26, 2011 July 26, 2011 Hanford Reaches Recovery Act Goal for Waste Cleanup Ahead of Schedule - Workers Shipped 1,800 Cubic Meters for Treatment and Disposal RICHLAND, Wash. - Today, the Department of Energy Hanford Site announced it reached a cleanup goal more than two months ahead of schedule at the Hanford Site in southeast Washington State. July 25, 2011 CX-006290: Categorical Exclusion Determination Cardwell-Cowlitz 2011 Wood Pole Replacements CX(s) Applied: B1.3 Date: 07/25/2011 Location(s): Cowlitz County, Washington Office(s): Bonneville Power Administration July 21, 2011 CX-006304: Categorical Exclusion Determination Grand Coulee-Bell #3/Grand Coulee-Westside #1 Insulator Replacement and Access Road Maintenance CX(s) Applied: B1.3 Date: 07/21/2011 Location(s): Grant County, Washington

253

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

November 18, 2009 November 18, 2009 CX-000195: Categorical Exclusion Determination Washington County Pierce CX(s) Applied: A9, A11, B5.1 Date: 11/18/2009 Location(s): Pierce County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office November 12, 2009 CX-000376: Categorical Exclusion Determination Boise White Paper Mill Carbon Capture and Sequestration CX(s) Applied: A1, A9, B3.1, B3.6 Date: 11/12/2009 Location(s): Richland, Washington Office(s): Fossil Energy, National Energy Technology Laboratory November 4, 2009 Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams $30.6 million Recovery Act investment by the Department of Energy highlights the additional potential of hydro power November 2, 2009

254

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2, 2011 2, 2011 EA-1858: Mitigation Action Plan Nippon Paper Industries USA Company Biomass Cogeneration Project May 1, 2011 EA-1679: Preliminary Environmental Assessment Grand Coulee's Third Powerplant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington April 28, 2011 CX-005892: Categorical Exclusion Determination Columbia River Inter-Tidal Fish Commission Use of White Bluffs Boat Launch and Hanford Town Boat Ramp for Salmon Tagging CX(s) Applied: B3.8 Date: 04/28/2011 Location(s): Richland, Washington Office(s): Environmental Management, Office of River Protection-Richland Office April 26, 2011 CX-005891: Categorical Exclusion Determination 200 Area Tank Farm Interim Surface Barriers CX(s) Applied: B6.9 Date: 04/26/2011 Location(s): Richland, Washington

255

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

United States » Washington United States » Washington Washington December 24, 2013 The concrete "core" is removed from Tank C-105 after workers cut a 55-inch hole in the tank dome. Cleanup Progresses at the Office of River Protection RICHLAND, Wash. - EM's Office of River Protection's (ORP) mission continues: to retrieve, treat and dispose of the 56 million gallons of radioactive and chemical waste stored in large, underground tanks. In 2013, ORP maintained steady progress toward the successful completion of its mission. December 24, 2013 Workers sample a well used to monitor groundwater at the Hanford site. EM's Richland Operations Office Celebrates Disposal Achievement in 2013 RICHLAND, Wash. - EM's Richland Operations Office's 2013 accomplishments ranged from cleaning up buildings and waste sites to treating a record

256

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

22, 2010 22, 2010 CX-002030: Categorical Exclusion Determination Solar Array and Charging Stations - Administration Building/Cathcart CX(s) Applied: B5.1 Date: 04/22/2010 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 22, 2010 CX-002029: Categorical Exclusion Determination Engine Generator for Enumclaw Dairy Manure Digester CX(s) Applied: B5.1 Date: 04/22/2010 Location(s): King County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office April 22, 2010 CX-001830: Categorical Exclusion Determination YWCA Family Village at Issaquah CX(s) Applied: B2.1, B2.5, B5.1 Date: 04/22/2010 Location(s): King county, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office

257

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 10, 2003 March 10, 2003 EIS-0330: Record of Decision Wallula-McNary Transmission Line Project and Wallula Power Project March 7, 2003 EA-1454: Finding of No Significant Impact Reactivation and Use of Three Former Borrow Sites in the 100-F,100-H, and 100-N Areas, Hanford Site, Richland, Washington March 6, 2003 EIS-0285-SA-128: Supplement Analysis Transmission System Vegetation Management Program March 3, 2003 EIS-0286: Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington March 3, 2003 EIS-0286: Revised Draft Environmental Import Statement Richland Operations Office, Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington March 3, 2003 EA-1454: Final Environmental Assessment Reactivation and Use of Three Former Borrow Sites in the 100-F,100-H, and

258

Washington.indd  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Washington Washington www.effi cientwindows.org March 2013 1. Meet the Energy Code and Look for the ENERGY STAR ® Windows must comply with your local energy code. Windows that are ENERGY STAR qualifi ed typically meet or exceed energy code requirements. To verify if specific window energy properties comply with the local code requirements, go to Step 2. 2. Look for Effi cient Properties on the NFRC Label The National Fenestration Rating Council (NFRC) label is needed for verifi cation of energy code compliance (www.nfrc. org). The NFRC label displays whole- window energy properties and appears on all fenestration products which are part of the ENERGY STAR program.

259

Hanford Site, Richland, Washington  

Broader source: Energy.gov (indexed) [DOE]

for the Environmental for the Environmental and Molecular Sciences Laboratory at the Hanford Site, Richland, Washington September 1992 U.S. Department of Energy Richland, Washington 99352 Contents 1 . 0 Summary . . 2.0 Purpose of and Need for the Proposed Action . . . . . . 3.0 Proposed Action and Alternatives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.1 Proposed Action 3.2 Onsite Alternatives . . . . . . . . . . 3.3 Offsite Alternatives . . . . . . . . . 3.4 No Action Alternative ~ ~ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4.0 Affected Environment . . . . . . . . . . . 5.0 Environmental Impacts . . . . . . . . . . . 5.1 Construction Impacts 5.1.1 Atmospheric Impacts . . . . . . . . . . . . . . . . . . . . . . . . . 5.1.2 Terrestrial Impacts . 5.1.3 Impacts on CERCLA Remedial Actions . 5.1.4 Construction Accidents .

260

GRR/Section 17-NV-a - Aesthetic Resource Assessment | Open Energy  

Open Energy Info (EERE)

GRR/Section 17-NV-a - Aesthetic Resource Assessment GRR/Section 17-NV-a - Aesthetic Resource Assessment < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 17-NV-a - Aesthetic Resource Assessment 17NVAAestheticResourceAssessment.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 17NVAAestheticResourceAssessment.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Add Text Print PDF Retrieved from "http://en.openei.org/w/index.php?title=GRR/Section_17-NV-a_-_Aesthetic_Resource_Assessment&oldid=685690" Categories: Regulatory Roadmap State Sections

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

ENVIRONMENTAL ASSESSMENT DOI-BLM-NV-W030-2010-0006-EA; DOE/EA-1810  

Broader source: Energy.gov (indexed) [DOE]

DOI-BLM-NV-W030-2010-0006-EA; DOE/EA-1810 SAN EMIDIO GEOTHERMAL EXPLORATION PROJECT Geothermal Drilling Permits Geothermal Leases NVN-42707, NVN-75233, and NVN-74196 Exploration Well Numbers 62-4, 68-33, 57-33, 73-9, 84-16, and 87-16 Washoe County, Nevada October 2010 Prepared by: U.S. Bureau of Land Management Winnemucca District Office BLM Black Rock Field Office/Nevada 5100 E. Winnemucca Blvd. Winnemucca NV 89445-2921 U. S. Department of Energy Cooperating Agency Environmental Assessment San Emidio Geothermal Exploration Project It is the mission of the Bureau of Land Management to sustain the health, diversity, and productivity of the public lands for the use and enjoyment of present and future generations. BLM/NV/WN/EA-10/31+1792 DOI-BLM-NV-W030--2010-0006-EA;

262

GRR/Section 1-NV-a - State Land Use Planning | Open Energy Information  

Open Energy Info (EERE)

-NV-a - State Land Use Planning -NV-a - State Land Use Planning < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 1-NV-a - State Land Use Planning 01NVAStateLandUsePlanning (1).pdf Click to View Fullscreen Contact Agencies Nevada Division of State Lands Regulations & Policies NRS 278: Planning and Zoning Triggers None specified Click "Edit With Form" above to add content 01NVAStateLandUsePlanning (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative _ 1-NV-a.1 - Inventory Population Data, Land Use Survey, Housing, and Economic Data According to the Planner's Guide, a land use plan ought to consider:

263

GRR/Section 4-NV-a - State Exploration Process | Open Energy Information  

Open Energy Info (EERE)

4-NV-a - State Exploration Process 4-NV-a - State Exploration Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-NV-a - State Exploration Process 04NVAStateExplorationProcess (1).pdf Click to View Fullscreen Contact Agencies Nevada Division of Minerals Nevada Department of Wildlife Nevada Division of Environmental Protection Regulations & Policies NAC 534A.190: Individual Geothermal Well NAC 534A.193: Geothermal Project Area Triggers None specified Click "Edit With Form" above to add content 04NVAStateExplorationProcess (1).pdf 04NVAStateExplorationProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative ____ 4-NV-a.1 - Is the Proposed Activity Pre-Drilling Exploration or Exploration

264

http://www.sord.nv.doe.gov/meda_wind_roses_by_station_numbe.htm  

National Nuclear Security Administration (NNSA)

Phone: Contact - (702) 295-1232 Fax - (702) 295-3068 http:www.sord.nv.doe.gov Report web page problems to: SORD Webmaster Page 1 of 2 SORD MEDA Wind Roses 5252011 http:...

265

http://www.fs.fed.us/sopa/state-level.php?nv  

National Nuclear Security Administration (NNSA)

of 2 USDA Forest Service - SOPA - Nevada 5232011 http:www.fs.fed.ussopastate-level.php?nv Humboldt-Toiyabe National Forest Inyo National Forest Klamath National Forest Lake...

266

http://www.sord.nv.doe.gov/MEDAStationInfo-tng.htm  

National Nuclear Security Administration (NNSA)

Phone: Contact - (702) 295-1232 Fax - (702) 295-3068 http:www.sord.nv.doe.gov Report web page problems to: SORD Webmaster Date Modified: 031208 ||Home | Privacy Policy |...

267

http://www.sord.nv.doe.gov/meda_wind_roses_by_station_numbe.htm  

National Nuclear Security Administration (NNSA)

Phone: Contact - (702) 295-1232 Fax - (702) 295-3068 http:www.sord.nv.doe.gov Report web page problems to: SORD Webmaster Page 1 of 2 SORD MEDA Wind Roses 5162011 http:...

268

Local Event - Nevada Test Site, Las Vegas, NV | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Local Event - Nevada Test Site, Las Vegas, NV Local Event - Nevada Test Site, Las Vegas, NV Local Event - Nevada Test Site, Las Vegas, NV October 25, 2013 9:00AM PDT National Day of Remembrance Local Event Where: National Atomic Testing Museum 755 E Flamingo Rd Las Vegas, NV 89119 On June 11th, 2013, Senators Mark Udall (D-CO) and Lamar Alexander (R-TN) introduced a bipartisan resolution to designate October 30 as the fifth annual National Day of Remembrance for former nuclear weapons workers and uranium miners who proudly served their country starting with the Manhattan Project through present day. Representatives from the DOE, Federal Government, and Atomic Testing Museum will speak on behalf of former workers. Admission to the National Atomic Testing Museum will be free for the day. Local coordinators will have a booth and conduct outreach on the

269

Energy Incentive Programs, Washington | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Washington Energy Incentive Programs, Washington Updated January 2013 Washington utilities budgeted over 180 million in 2011 to promote increased energy efficiency in the state,...

270

Washington/Incentives | Open Energy Information  

Open Energy Info (EERE)

Washington/Incentives Washington/Incentives < Washington Jump to: navigation, search Contents 1 Financial Incentive Programs for Washington 2 Rules, Regulations and Policies for Washington Download All Financial Incentives and Policies for Washington CSV (rows 1 - 184) Financial Incentive Programs for Washington Download Financial Incentives for Washington CSV (rows 1 - 163) Incentive Incentive Type Active Avista Utilities (Electric) - Commercial Lighting Energy Efficiency Program (Washington) Utility Rebate Program No Avista Utilities (Electric) - Commercial Energy Efficiency Incentives Program (Washington) Utility Rebate Program Yes Avista Utilities (Electric) - Residential Energy Efficiency Rebate Programs (Washington) Utility Rebate Program Yes Avista Utilities (Electric) - Commercial Food Equipment Rebates (Washington) Utility Rebate Program No

271

Washington: Washington's Clean Energy Resources and Economy (Brochure)  

SciTech Connect (OSTI)

This document highlights the Office of Energy Efficiency and Renewable Energy's investments and impacts in the state of Washington.

Not Available

2013-03-01T23:59:59.000Z

272

EA-1949: Admiralty Inlet Pilot Tidal Project, Puget Sound, WA  

Broader source: Energy.gov [DOE]

This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within Island County, Washington. The Federal Energy Regulatory Commission (FERC) is the lead agency. DOE is a cooperating agency.

273

Washington County Comprehensive plan  

E-Print Network [OSTI]

Overview of Washington County's Natural Resources 81 Inventory & Assessment - Natural Resources 81 Inventory & Assessment - Steep Slopes 82 Inventory & Assessment - Karst 83 Natural Resources Recommendations What Are the Key Findings from the Research? 13 Land Use 13 Economic Development 13 Housing 13 Natural

274

NV/YMP radiological control manual, Revision 2  

SciTech Connect (OSTI)

The Nevada Test Site (NTS) and the adjacent Yucca Mountain Project (YMP) are located in Nye County, Nevada. The NTS has been the primary location for testing nuclear explosives in the continental US since 1951. Current activities include operating low-level radioactive and mixed waste disposal facilities for US defense-generated waste, assembly/disassembly of special experiments, surface cleanup and site characterization of contaminated land areas, and non-nuclear test operations such as controlled spills of hazardous materials at the hazardous Materials (HAZMAT) Spill Center (HSC). Currently, the major potential for occupational radiation exposure is associated with the burial of low-level nuclear waste and the handling of radioactive sources. Planned future remediation of contaminated land areas may also result in radiological exposures. The NV/YMP Radiological Control Manual, Revision 2, represents DOE-accepted guidelines and best practices for implementing Nevada Test Site and Yucca Mountain Project Radiation Protection Programs in accordance with the requirements of Title 10 Code of Federal Regulations Part 835, Occupational Radiation Protection. These programs provide protection for approximately 3,000 employees and visitors annually and include coverage for the on-site activities for both personnel and the environment. The personnel protection effort includes a DOE Laboratory Accreditation Program accredited dosimetry and personnel bioassay programs including in-vivo counting, routine workplace air sampling, personnel monitoring, and programmatic and job-specific As Low as Reasonably Achievable considerations.

Gile, A.L. [comp.] [comp.

1996-11-01T23:59:59.000Z

275

RAPID/Roadmap/6-WA-d | Open Energy Information  

Open Energy Info (EERE)

of a Hydraulic Project Approval Permit issued by the Washington State Department of Fish and Wildlife. State waters include all marine waters and fresh waters of the state,...

276

RAPID/Roadmap/18-WA-a | Open Energy Information  

Open Energy Info (EERE)

173-360. Washington defines an "Underground Storage Tank" as any one or combination of tanks (including underground pipes connected thereto) that is used to contain an...

277

EIS-0325: Schultz-Hanford Area Transmission Line Project, WA  

Broader source: Energy.gov [DOE]

BPA proposes to construct a new 500-kilovolt (kV) transmission line in central Washington. This project would increase transmission system capacity north of Hanford.

278

RAPID/Roadmap/6-WA-a | Open Energy Information  

Open Energy Info (EERE)

Click to View Fullscreen Permit Overview The Washington State Department of Transportation grants permits for vehicles and loads which exceed the limits outlined in the...

279

Gaseous Detonation-Driven Fracture of Tubes Tong Wa Chao  

E-Print Network [OSTI]

Gaseous Detonation-Driven Fracture of Tubes Thesis by Tong Wa Chao In Partial Fulfillment An experimental investigation of fracture response of aluminum 6061-T6 tubes under internal gaseous detonation on the detonation velocity, strain history, blast pressure from the crack opening, and crack speeds. The curved

280

EIS-0397: Lyle Falls Fish Passage Project, WA  

Broader source: Energy.gov [DOE]

This EIS analyzes BPA's decision to modify funding to the existing Lyle Falls Fishway on the lower Klickitat River in Klickitat County, WA. The proposed project would help BPA meet its off-site mitigation responsibilities for anadromous fish affected by the development of the Federal Columbia River Power System and increase overall fish production in the Columbia Basin.

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

January 15, 2013 January 15, 2013 EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA December 27, 2012 EM's Office of River Protection has successfully removed waste from a tenth storage tank at the Hanford site. Located in C Farm, C-109 is one of 16 underground tanks ranging in capacity from 55,000 to 530,000 gallons. Retrieval of Tenth Single-shell Tank Complete at Hanford's Office of River Protection RICHLAND, Wash. - The Office of River Protection (ORP) has completed retrieval of radioactive and chemical waste from the tenth underground waste storage tank at the Hanford site. December 17, 2012 CX-009746: Categorical Exclusion Determination Upstream Ultrasonic Processing for Small Producers: Preventative Maintenance for Paraffin Management

282

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6, 2011 6, 2011 A heavy layer of air pollution, a mix of aerosol particles and vapors, obscures the view over Mexico City. Two studies by the Pacific Northwest National Laboratory show the importance of including the small-scale effects of aerosols in climate modeling. | Image courtesy of PNNL Our Dusty Atmosphere Aerosols -- tiny particles like soot and dust - in our atmosphere can make a difference in weather, as well as climatic warming and cooling.
 Studying these tiny particles could lead to improvements in global climate models. September 2, 2011 EIS-0419: EPA Notice of Availability Whistling Ridge Energy Project Final Environmental Impact Statement DOE proposes to construct and operate a 75-megawatt Wind Turbine Facility in the City of White Salmon, Skamania County, WA.

283

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

28, 2011 28, 2011 EIS-0423: Final Environmental Impact Statement Long-Term Management and Storage of Elemental Mercury January 28, 2011 CX-005134: Categorical Exclusion Determination Provision of Funds to the Yakama Nation for the Purchase of Three Parcels of Property Along Reecer Creek CX(s) Applied: B1.25 Date: 01/28/2011 Location(s): Kittitas County, Washington Office(s): Bonneville Power Administration January 28, 2011 EIS-0423: EPA Notice of Availability of the Final Environmental Impact Statement Long -Term Management and Storage of Elemental Mercury January 21, 2011 CX-005130: Categorical Exclusion Determination Ringold Substation Structure Replacement Project CX(s) Applied: B4.6 Date: 01/21/2011 Location(s): Basin City, Washington Office(s): Bonneville Power Administration

284

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

January 12, 2011 January 12, 2011 The carbon steel doors come together to form an upside-down L-shape. The 102-ton door was set on top of the 85-ton door that was installed at the end of December. Hanford Waste Treatment Plant Sets Massive Protective Shield door in Pretreatment Facility Richland, Wash. -- Earlier this week, an enormous protective shield door was set in the Pretreatment Facility at the Hanford Waste Treatment Plant, also known as the "Vit Plant." The 102-ton door was lowered through the roof and placed on top of an adjoining 85-ton door that was installed at the end of December. January 10, 2011 CX-007074: Categorical Exclusion Determination Washington-City-Vancouver CX(s) Applied: A1, A9, A11, B2.5, B5.1 Date: 01/10/2011 Location(s): Vancouver, Washington

285

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

6, 2011 6, 2011 CX-007504: Categorical Exclusion Determination 300 Area Nanoscale Research and Development Projects CX(s) Applied: B3.15, A9, B3.6 Date: 12/06/2011 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 1, 2011 EA-1679: Revision Sheet for Final Environmental Assessment Grand Coulee's Third Power plant 500-kV Transmission Line Replacement Project, Grant and Okanogon Counties, Washington November 18, 2011 Demolition Begins on Hanford's Historic Plutonium Vaults - Plutonium Finishing Plant on track to meet regulatory milestone RICHLAND, WASH. - The U.S. Department of Energy (DOE) and contractor CH2M HILL Plateau Remediation Company (CH2M HILL) began demolishing a vault complex that once held stores of plutonium for the U.S. nuclear weapons

286

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

April 15, 2011 April 15, 2011 CX-005676: Categorical Exclusion Determination Murray-Custer #1 Transmission Line Wood Pole Replacement CX(s) Applied: B1.3 Date: 04/15/2011 Location(s): Snohomish County, Washington Office(s): Bonneville Power Administration April 13, 2011 Algae samples back at the NREL lab, ready to be analyzed and run through the Fluorescent-Activated Cell Sorter, or FACS, which separates the cells. | Credit: NREL Staff Photographer Dennis Schroeder. Study: Algae Could Replace 17% of U.S. Oil Imports A new study from Pacific Northwest National Lab concludes that 17% of U.S. oil imports for transportation could be replaced by domestically-produced algae biofuels. April 12, 2011 Beep Beep! King County, Washington Is Charging Up Savings King County uses $6.1 million to make investments that dramatically reduce

287

Washington. DC,20585  

Office of Legacy Management (LM)

Washington. DC,20585 Washington. DC,20585 MAY' i 1995 .- The Honorable Freeman R. Bosley, Jr. ' r City Hall 1200 Narket Street St. Louis, Missouri 63103 Dear Mayor Bosley: ,'~ ,. : !' Secretary of Energy Hazel O'Leary'has announced a new approach to'openness'in " the Department of,Energy"(DOE) and its communications with the pu~blic. In 'support of this initiative, we are pleased to forward the enclosed information rel,ated to the former Petrolite Corp. site in your jurisdiction that,performed, work for DDE or,i.ts predecessor agencies. your information, use, and retention. This information is provided for DDE's Formerly Utilized Sites Remedial Action Program is responsible for identification of sites used by DDE's predecessor agencies, determining their

288

I ' Washington, DC'  

Office of Legacy Management (LM)

' Washington, DC' ' Washington, DC' 20585 The.Honorable Don Trotter, 102' Public Square Clarksville, Tennessee '37040 '_ _' ' Dear Mayor Trotter: '. Secretary of Energy Hazel .O'Leary has announced a new the Department of Energy (DOE) and its communications support of this initiative, we are pleased to forward related to the Clarksville Foundry.& Machine Co. site approach to openness in with the publ,ic'. In " the~enclosed~information in your'jurisdiction that performed work for DOE or its predecessor'agencies. This information. is provided, for.your information, use, and retention. remedial action conservative' set of technical investigations to assure environment. If'you have any questions, please feel free~to call DrI W. Alexander Uilliams 301-427-1719 of my staff.

289

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

9, 2011 9, 2011 Department of Energy Announces $39 Million to Strengthen University-Led Nuclear Energy Research and Development 51 Projects Aim to Cut Carbon Pollution, Create Clean Energy Jobs and Strengthen America's Nuclear Energy Industry August 9, 2011 CX-006474: Categorical Exclusion Determination Biodiesel Crusher and Dryer Facility Upgrades CX(s) Applied: B5.1 Date: 08/09/2011 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, Golden Field Office August 8, 2011 CX-006463: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 08/08/2011 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory August 8, 2011

290

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

December 10, 2009 December 10, 2009 CX-000347: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: A1, A9, B5.1 Date: 12/10/2009 Location(s): Snohomish County, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 10, 2009 CX-000346: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: A1, A9 Date: 12/10/2009 Location(s): Seattle, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory December 7, 2009 CX-000457: Categorical Exclusion Determination Focused Site Characterization for Carbon Dioxide Storage Along a Mount Simon Sandstone Fairway in the Michigan Basin CX(s) Applied: A1, A9

291

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 1, 2002 March 1, 2002 EIS-0333: Draft Environmental Impact Statement Bonneville Power Administration, Benton County, Washington March 1, 2002 EA-1405: Final Environmental Assessment Transuranic Waste Retrieval from the 218-W-4B and 218-W-4C Low-Level Burial Grounds, Hanford Site, Richland, Washington February 27, 2002 EIS-0183: DOE Notice of Availability of the Record of Decision Mint Farm Generation Project February 27, 2002 EIS-0285-SA-46: Supplement Analysis Transmission System Vegetation Management Program February 27, 2002 EIS-0285-SA-45: Supplement Analysis Transmission System Vegetation Management Program February 15, 2002 EIS-0285-SA-42: Supplement Analysis Transmission System Vegetation Management Program February 1, 2002 EIS-0332: Draft Environmental Impact Statement

292

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 13, 2012 September 13, 2012 HAMMER Celebrates 15th Anniversary: Dedicates New U.S. State Department Field Exercise Building RICHLAND, Wash. - The Volpentest HAMMER Training Center, located at the Department of Energy's (DOE) Hanford Site in southeastern Washington state, will mark its 15th anniversary of operations and dedicate a new Field Exercise Building for the U.S. State Department's counterterrorism efforts. September 6, 2012 Retrieval of Ninth Single-Shell Tank Complete Richland - Washington River Protection Solutions (WRPS) has completed the retrieval of radioactive and chemical waste from single-shell tank (SST) C-104, an underground storage tank that once held 259,000 gallons of waste left over from nuclear weapons production at Hanford. WRPS is the tank

293

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

March 16, 2005 March 16, 2005 EIS-0312-SA-02: Supplement Analysis Fish and Wildlife Implementation Plan December 23, 2004 EIS-0183: DOE Notice of Availability of the Record of Decision Hopkins Ridge Wind Interconnection Project September 3, 2004 EIS-0346: EPA Notice of Availability of the Draft Environmental Impact Statement Salmon Creek Project, Water Flow Restoration and Streambed Rehabilitation, Providing Passage for Summer Steelhead and Spring Chinook, Funding, Okanogan County, Washington September 3, 2004 EIS-0346: Draft Environmental Impact Statement Salmon Creek Project August 27, 2004 EIS-0349: Final Environmental Impact Statement BP Cherry Point Cogeneration Project August 27, 2004 EIS-0349: EPA Notice of Availability of the Final Environmental Impact Statement BP Cherry Point Cogeneration Project, Whatcom County, Washington

294

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

11, 2011 11, 2011 EIS-0422: Record of Decision Bonneville Power Administration's Central Ferry-Lower Monumental 500-kilovolt Transmission Line Project March 11, 2011 CX-005421: Categorical Exclusion Determination Ohop Underbuild Project CX(s) Applied: B4.6, B4.12 Date: 03/11/2011 Location(s): Pierce County, Washington Office(s): Bonneville Power Administration March 7, 2011 CX-005417: Categorical Exclusion Determination Beaver Creek Property CX(s) Applied: B1.25 Date: 03/07/2011 Location(s): Okanogan County, Washington Office(s): Bonneville Power Administration March 4, 2011 Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Progress: Recovery Act Funding Allows Demolition of Power Houses Ahead of Schedule RICHLAND, WASH. - Today's safe and successful explosive demolition at

295

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

0, 2011 0, 2011 CX-006068: Categorical Exclusion Determination Site Characterization and Environmental Monitoring CX(s) Applied: B3.1 Date: 06/20/2011 Location(s): Richland, Washington Office(s): Office of River Protection-Richland Office June 14, 2011 Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery Act Funding Puts U Canyon in Home Stretch of Demolition Preparations RICHLAND, Wash. - Hanford workers are pouring enough cement-like material to fill six Olympic-size swimming pools in one of the U.S. Department of Energy's (DOE) largest nuclear facilities at the Hanford Site in southeast Washington State to prepare the massive building for demolition. June 14, 2011 CX-006253: Categorical Exclusion Determination North Bonneville-Ross #1 230-Kilovolt, North Bonneville-Troutdale #2

296

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

June 15, 2010 June 15, 2010 CX-003090: Categorical Exclusion Determination Perform Routine Access Road Maintenance within the McNary-Ross Number 1 Transmission Line Corridor CX(s) Applied: B1.3 Date: 06/15/2010 Location(s): Klickitat County, Washington Office(s): Bonneville Power Administration June 11, 2010 More than $60 Million in Recovery Act Funding to Expand Local Energy Efficiency Efforts in 20 Communities Competitive block grants to support jobs, save money and increase energy independence June 10, 2010 CX-002767: Categorical Exclusion Determination Granite Mountain 3G Radio Station Project CX(s) Applied: B1.19 Date: 06/10/2010 Location(s): Stevens County, Washington Office(s): Bonneville Power Administration June 9, 2010 Clark County Develops On-the-Job Weatherization Training Program

297

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

October 15, 2002 October 15, 2002 EIS-0285-SA-112: Supplement Analysis Transmission System Vegetation Management Program October 6, 2002 EIS-0265-SA-92: Supplement Analysis Watershed Management Program October 2, 2002 EIS-0285-SA-110: Supplement Analysis Transmission System Vegetation Management Program October 1, 2002 EIS-0332: Mitigation Action Plan McNary-John Day Transmission Line Project September 30, 2002 EIS-025-SA-106: Supplement Analysis Transmission System Vegetation Management Program -106 SnoKing Tap to Monroe-Samamish Line) within Snohomish County, Washington September 26, 2002 EIS-0246-SA-29: Supplement Analysis Wildlife Mitigation Program, on the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington September 26, 2002 EIS-0265-SA-90: Supplement Analysis

298

Binding of He{sub n}V clusters to ?-Fe grain boundaries  

SciTech Connect (OSTI)

The objective of this research is to explore the formation/binding energetics and length scales associated with the interaction between He{sub n}V clusters and grain boundaries in bcc ?-Fe. In this work, we calculated formation/binding energies for 18 He atoms in a monovacancy at all potential grain boundary (GB) sites within 15? of the ten grain boundaries selected (122106 simulations total). The present results provide detailed information about the interaction energies and length scales of 18 He atoms with grain boundaries for the structures examined. A number of interesting new findings emerge from the present study. First, the ?3(112) twin GB has significantly lower binding energies for all He{sub n}V clusters than all other boundaries in this study. For all grain boundary sites, the effect of the local environment surrounding each site on the He{sub n}V formation and binding energies decreases with an increasing number of He atoms in the He{sub n}V cluster. Based on the calculated dataset, we formulated a model to capture the evolution of the formation and binding energy of He{sub n}V clusters as a function of distance from the GB center, utilizing only constants related to the maximum binding energy and the length scale.

Tschopp, M. A., E-mail: mark.a.tschopp.civ@mail.mil [U.S. Army Research Laboratory, Aberdeen Proving Ground, Maryland 21005 (United States); Gao, F. [Pacific Northwest National Laboratory, Richland, Washington 99352 (United States); Solanki, K. N. [Arizona State University, Tempe, Arizona 85287 (United States)

2014-06-21T23:59:59.000Z

299

Alternative Fuels Data Center: Washington Information  

Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

Washington Information Washington Information to someone by E-mail Share Alternative Fuels Data Center: Washington Information on Facebook Tweet about Alternative Fuels Data Center: Washington Information on Twitter Bookmark Alternative Fuels Data Center: Washington Information on Google Bookmark Alternative Fuels Data Center: Washington Information on Delicious Rank Alternative Fuels Data Center: Washington Information on Digg Find More places to share Alternative Fuels Data Center: Washington Information on AddThis.com... Washington Information This state page compiles information related to alternative fuels and advanced vehicles in Washington and includes new incentives and laws, alternative fueling station locations, truck stop electrification sites, fuel prices, and local points of contact.

300

GRR/Section 6-NV-a - Transportation Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 6-NV-a - Transportation Permit GRR/Section 6-NV-a - Transportation Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-NV-a - Transportation Permit 06NVATransportationPermit.pdf Click to View Fullscreen Contact Agencies Nevada Department of Transportation Nevada Department of Motor Vehicles Regulations & Policies Nevada Traffic Laws for Size Weight Load Triggers None specified Click "Edit With Form" above to add content 06NVATransportationPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Nevada Department of Transportation (NDOT) regulates the transport of oversized loads on Nevada's roads. NDOT regulates oversized loads in order

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

GRR/Section 14-NV-b - NPDES Permit Program | Open Energy Information  

Open Energy Info (EERE)

4-NV-b - NPDES Permit Program 4-NV-b - NPDES Permit Program < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-NV-b - NPDES Permit Program 14NVBNPDESPermitProgram.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Nevada Division of Water Resources nevada Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) Nevada Water Pollution Control Law: NRS 445A.300-445A.730 Triggers None specified Click "Edit With Form" above to add content 14NVBNPDESPermitProgram.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

302

DOI-BLM-NV-CC-ES-11-10-1793 | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-CC-ES-11-10-1793 DOI-BLM-NV-CC-ES-11-10-1793 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-CC-ES-11-10-1793 EIS at Salt Wells Geothermal Area for Geothermal/Power Plant Salt Wells Geothermal Energy Projects EIS General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EIS Applicant Ormat Technologies Inc, Gradient Resources (formerly Vulcan Power), Sierra Pacific Power Co, Consultant EMPSi Geothermal Area Salt Wells Geothermal Area Project Location Nevada Project Phase Geothermal/Power Plant Techniques Development Drilling Time Frame (days) NEPA Process Time 749 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater

303

DOI-LM-NV-W010-2012-0061-CX | Open Energy Information  

Open Energy Info (EERE)

LM-NV-W010-2012-0061-CX LM-NV-W010-2012-0061-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-LM-NV-W010-2012-0061-CX CX at Desert Queen Geothermal Area for Geothermal/Exploration, Geothermal Temperature Gradient Well Drilling at Desert Queen General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Nevada Bureau of Mines and Geology Geothermal Area Desert Queen Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Thermal Gradient Holes Time Frame (days) Application Time 127 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office Humboldt River Funding Agencies none provided Surface Manager BLM

304

GRR/Section 15-NV-a - Nevada Clean Air Act Process | Open Energy  

Open Energy Info (EERE)

15-NV-a - Nevada Clean Air Act Process 15-NV-a - Nevada Clean Air Act Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 15-NV-a - Nevada Clean Air Act Process 15NVANevadaCleanAirActProcess.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection United States Environmental Protection Agency Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) Triggers None specified Click "Edit With Form" above to add content 15NVANevadaCleanAirActProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The federal Clean Air Act is administered by the United States

305

GRR/Section 4-FD-b - Exploration Pre-Application Process (NV only) | Open  

Open Energy Info (EERE)

GRR/Section 4-FD-b - Exploration Pre-Application Process (NV only) GRR/Section 4-FD-b - Exploration Pre-Application Process (NV only) < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-FD-b - Exploration Pre-Application Process (NV only) 04FDBExplorationPreApplicationProcess.pdf Click to View Fullscreen Contact Agencies Bureau of Land Management United States Forest Service Regulations & Policies 43 CFR 3251 Exploration Operations: Getting BLM Approval 43 CFR 3261 Drilling Operations: Getting a Permit Triggers None specified Click "Edit With Form" above to add content 04FDBExplorationPreApplicationProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

306

GRR/Section 12-NV-a - Flora and Fauna Considerations | Open Energy  

Open Energy Info (EERE)

2-NV-a - Flora and Fauna Considerations 2-NV-a - Flora and Fauna Considerations < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 12-NV-a - Flora and Fauna Considerations 12NVAFloraFaunaConsiderations.pdf Click to View Fullscreen Contact Agencies Nevada Department of Wildlife Nevada State Office of Energy Regulations & Policies NRS 701.600 et seq Triggers None specified Click "Edit With Form" above to add content 12NVAFloraFaunaConsiderations.pdf 12NVAFloraFaunaConsiderations.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Nevada has a particular state notification and review process for wildlife considerations for all energy projects 10 megawatts or greater. The process

307

DOI-BLM-NV-C010-2009-0051-CX | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-C010-2009-0051-CX DOI-BLM-NV-C010-2009-0051-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2009-0051-CX CX at Soda Lake Geothermal Area for Geothermal/Exploration, Magnetotelluric Survey at Soda Lake General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Global Magma Energy Group Geothermal Area Soda Lake Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Magnetotelluric Techniques Comments The Bureau of Reclamation has deferred surface management authority to the BLM for this project. Time Frame (days) Application Time 27 Participating Agencies Lead Agency Nevada Funding Agency none provided Managing District Office Carson City

308

GRR/Section 18-NV-c - Waste Disposal Permit | Open Energy Information  

Open Energy Info (EERE)

NV-c - Waste Disposal Permit NV-c - Waste Disposal Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-NV-c - Waste Disposal Permit 18NVCWasteDisposalPermit.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) Triggers None specified Click "Edit With Form" above to add content 18NVCWasteDisposalPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Within the Nevada Division of Environmental Protection in Nevada, the Bureau of Waste Management (BWM) operates a permitting and compliance

309

GRR/Section 11-NV-a - Cultural Considerations | Open Energy Information  

Open Energy Info (EERE)

1-NV-a - Cultural Considerations 1-NV-a - Cultural Considerations < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 11-NV-a - Cultural Considerations 11NVACulturalConsiderations (1).pdf Click to View Fullscreen Contact Agencies Nevada State Historic Preservation Office Nevada State Office of Energy Nevada Public Utilities Commission National Park Service Advisory Council on Historic Preservation Regulations & Policies National Historic Preservation Act Native American Graves Protection Act Triggers None specified Click "Edit With Form" above to add content 11NVACulturalConsiderations (1).pdf 11NVACulturalConsiderations (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

310

DOI-BLM-NV-CO1000-2010-0011-CX | Open Energy Information  

Open Energy Info (EERE)

CO1000-2010-0011-CX CO1000-2010-0011-CX CX at Coyote Canyon Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Terra-Gen Power LLC Geothermal Area Coyote Canyon Geothermal Area Project Location Churchill County, NV, Churchill County, NV Project Phase Geothermal/Exploration Techniques Electromagnetic Techniques Time Frame (days) Application Time 209 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 6/30/2009 Decision Document Date 1/25/2010 Relevant Numbers Lead Agency Doc Number DOI-BLM-NV-C010-2010-0011-CX

311

EA-1944: Ormat Technologies Brady Hot Springs Project, Churchill County, NV  

Broader source: Energy.gov (indexed) [DOE]

944: Ormat Technologies Brady Hot Springs Project, Churchill 944: Ormat Technologies Brady Hot Springs Project, Churchill County, NV EA-1944: Ormat Technologies Brady Hot Springs Project, Churchill County, NV SUMMARY Ormat Technologies, Inc. (Ormat) proposes to use DOE and cost share funding to study the Brady Hot Springs geothermal Field 15-12RD well. This is an EGS Demonstration project divided into three phases. During Phase 1, Ormat characterized the target well to prepare for stimulation activities in Phase 2, Phase 2: Well Stimulation and Collection/Analysis of Stimulation Monitoring Data and Phase 3: Long-term testing of the system. Phase 2 and 3 activities would occur at Ormat's Brady Hot Springs geothermal field in Churchill County, NV on public lands managed by the Bureau of Land Management (BLM) and Bureau of Reclamation (BOR). Since Phases 2 and 3

312

DOI-BLM-NV-C010-2013-0026-DNA | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-C010-2013-0026-DNA DOI-BLM-NV-C010-2013-0026-DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2013-0026-DNA DNA at Dixie Valley Geothermal Area for Geothermal/Well Field, Above ground drilling water pipeline (temporary) General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant TGP Coyote Canyon LLC Geothermal Area Dixie Valley Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Production Wells Time Frame (days) Application Time 56 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM

313

DOI-BLM-NV-C010-2013-0037-DNA | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-C010-2013-0037-DNA DOI-BLM-NV-C010-2013-0037-DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2013-0037-DNA DNA at Gabbs Valley Geothermal Area for Geothermal/Well Field, {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant ORNI 47 LLC Geothermal Area Gabbs Valley Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Drilling Methods Comments GDP Wild Rose Unit Well 57-11 Time Frame (days) Application Time 1 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM

314

GRR/Section 3-NV-c - Encroachment Permit for NDOT ROW | Open Energy  

Open Energy Info (EERE)

GRR/Section 3-NV-c - Encroachment Permit for NDOT ROW GRR/Section 3-NV-c - Encroachment Permit for NDOT ROW < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-NV-c - Encroachment Permit for NDOT ROW 03NVCEncroachment (1).pdf Click to View Fullscreen Contact Agencies Nevada Department of Transportation Regulations & Policies NRS Chapter 405 Control and Preservation of Public Highways Triggers None specified Click "Edit With Form" above to add content 03NVCEncroachment (1).pdf 03NVCEncroachment (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Nevada Department of Transportation (NDOT) grants permits for permanent installations within State rights-of-way and in areas maintained by the

315

GRR/Section 14-NV-c - Underground Injection Control Permit | Open Energy  

Open Energy Info (EERE)

4-NV-c - Underground Injection Control Permit 4-NV-c - Underground Injection Control Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-NV-c - Underground Injection Control Permit 14NVCUndergroundInjectionControlPermit.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Nevada Division of Minerals Nevada Division of Water Resources Bureau of Land Management Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) Triggers None specified Click "Edit With Form" above to add content 14NVCUndergroundInjectionControlPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

316

GRR/Section 14-NV-d - Section 401 Water Quality Certification | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-NV-d - Section 401 Water Quality Certification GRR/Section 14-NV-d - Section 401 Water Quality Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-NV-d - Section 401 Water Quality Certification 14NVDSection401WaterQualityCertification.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Regulations & Policies Section 401 of the Clean Water Act (33 U.S.C. 1341) Triggers None specified Click "Edit With Form" above to add content 14NVDSection401WaterQualityCertification.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Section 401 of the Clean Water Act (33 U.S.C. 1341) requires activities in

317

DOI-BLM-NV-C010-2012-0069-CX | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-C010-2012-0069-CX DOI-BLM-NV-C010-2012-0069-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0069-CX CX at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Ormat Technologies Inc Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Thermal Gradient Holes Time Frame (days) Application Time 27 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates

318

GRR/Section 14-NV-a - Nonpoint Source Pollution | Open Energy Information  

Open Energy Info (EERE)

NV-a - Nonpoint Source Pollution NV-a - Nonpoint Source Pollution < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-NV-a - Nonpoint Source Pollution 14NVANonpointSourcePollution.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) Triggers None specified Click "Edit With Form" above to add content 14NVANonpointSourcePollution.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Nevada Division of Environmental Protection (NDEP) developed its initial Nonpoint Source Pollution Management Program and Nonpoint Pollution

319

GRR/Section 6-NV-b - Construction Stormwater Permit | Open Energy  

Open Energy Info (EERE)

NV-b - Construction Stormwater Permit NV-b - Construction Stormwater Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-NV-b - Construction Stormwater Permit 06NVBConstructionStormWaterPermit (1).pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Regulations & Policies Nevada Revised Statue 445A Nevada Administrative Code 445A.228 to 445A.272 Triggers None specified Click "Edit With Form" above to add content 06NVBConstructionStormWaterPermit (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A developer who disturbs more than one acre and less than five acres must

320

GRR/Section 19-NV-a - Water Access and Water Rights Issues | Open Energy  

Open Energy Info (EERE)

GRR/Section 19-NV-a - Water Access and Water Rights Issues GRR/Section 19-NV-a - Water Access and Water Rights Issues < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 19-NV-a - Water Access and Water Rights Issues 19NVAWaterAccessAndWaterRightsIssues.pdf Click to View Fullscreen Contact Agencies Nevada Division of Water Resources Nevada Division of Environmental Protection Regulations & Policies Nevada Revised Statutes (NRS) NRS, Chapter 445A - water controls NRS, Chapter 533 - adjudication of vested water rights and appropriation of public waters NRS, Chapter 534 - outlines underground water and well NRS, Chapter 534A - geothermal resources Nevada Administrative Code (NAC) NAC, Chapter 445A - water controls Triggers None specified Click "Edit With Form" above to add content

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

GRR/Section 20-NV-a - Well Abandonment Process | Open Energy Information  

Open Energy Info (EERE)

20-NV-a - Well Abandonment Process 20-NV-a - Well Abandonment Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 20-NV-a - Well Abandonment Process 20NVAWellAbandonmentProcess (1).pdf Click to View Fullscreen Contact Agencies [[Nevada Division of Minerals]] Regulations & Policies NAC 534A.470 NAC 534A.540 Triggers None specified Click "Edit With Form" above to add content 20NVAWellAbandonmentProcess (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative This flowchart illustrates the procedure for plugging or abandoning a well in the state of Nevada. The Nevada Division of Minerals ("division")

322

GRR/Section 5-NV-b - Sundry Notice | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 5-NV-b - Sundry Notice GRR/Section 5-NV-b - Sundry Notice < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 5-NV-b - Sundry Notice 05NVBSundryNotice (2).pdf Click to View Fullscreen Contact Agencies Nevada Division of Minerals Regulations & Policies NAC 534A Geothermal Resources Triggers None specified Click "Edit With Form" above to add content 05NVBSundryNotice (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Nevada Division of Minerals can issue a sundry notice form for various modifications, minor changes, and routine maintenance of a well that is not covered under the initial permit or application. The developer should

323

DOI-BLM-NV-W010-2010-0043-CX-2 | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-W010-2010-0043-CX-2 DOI-BLM-NV-W010-2010-0043-CX-2 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W010-2010-0043-CX-2 CX at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Geothermal Technical Partners Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Geophysical Techniques, Slim Holes, Thermal Gradient Holes, Well Testing Techniques Time Frame (days) Application Time 148 Participating Agencies Lead Agency BLM Funding Agency DOE Managing District Office Winnemucca Managing Field Office Humboldt River Funding Agencies none provided

324

DOI-BLM-NV-B020-2009-0030-CX | Open Energy Information  

Open Energy Info (EERE)

NV-B020-2009-0030-CX NV-B020-2009-0030-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-B020-2009-0030-CX CX at Alum Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Sierra Geothermal Power Geothermal Area Alum Geothermal Area Project Location California Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 35 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Battle Mountain Managing Field Office BLM Tonopah Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 12/11/2008 Decision Document Date 1/15/2009

325

DOI-BLM-NV-B020-2008-0071-DNA | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-B020-2008-0071-DNA DOI-BLM-NV-B020-2008-0071-DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-B020-2008-0071-DNA DNA at Reese River Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Sierra Geothermal Partners Geothermal Area Reese River Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 26 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Battle Mountain Managing Field Office BLM Mount Lewis Field Office Funding Agencies none provided Surface Manager none provided Mineral Manager none provided Selected Dates

326

DOI-BLM-NV-W010-2011-0004-CX | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-W010-2011-0004-CX DOI-BLM-NV-W010-2011-0004-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W010-2011-0004-CX CX at Dixie Valley Geothermal Area for Geothermal/Exploration, AltaRock Seismic Survey General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant AltaRock Energy Inc Geothermal Area Dixie Valley Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Passive Seismic Techniques Time Frame (days) Application Time 160 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office Humboldt River Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates

327

EA-1944: Ormat Technologies Brady Hot Springs Project, Churchill County, NV  

Broader source: Energy.gov (indexed) [DOE]

944: Ormat Technologies Brady Hot Springs Project, Churchill 944: Ormat Technologies Brady Hot Springs Project, Churchill County, NV EA-1944: Ormat Technologies Brady Hot Springs Project, Churchill County, NV SUMMARY Ormat Technologies, Inc. (Ormat) proposes to use DOE and cost share funding to study the Brady Hot Springs geothermal Field 15-12RD well. This is an EGS Demonstration project divided into three phases. During Phase 1, Ormat characterized the target well to prepare for stimulation activities in Phase 2, Phase 2: Well Stimulation and Collection/Analysis of Stimulation Monitoring Data and Phase 3: Long-term testing of the system. Phase 2 and 3 activities would occur at Ormat's Brady Hot Springs geothermal field in Churchill County, NV on public lands managed by the Bureau of Land Management (BLM) and Bureau of Reclamation (BOR). Since Phases 2 and 3

328

GRR/Section 14-NV-d - 401 Water Quality Certification | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-NV-d - 401 Water Quality Certification GRR/Section 14-NV-d - 401 Water Quality Certification < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-NV-d - 401 Water Quality Certification 14NVDSection401WaterQualityCertification.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Regulations & Policies Section 401 of the Clean Water Act (33 U.S.C. 1341) Triggers None specified Click "Edit With Form" above to add content 14NVDSection401WaterQualityCertification.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Section 401 of the Clean Water Act (33 U.S.C. 1341) requires activities in

329

DOI-BLM-NV-W010-2010-0043-CX | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-W010-2010-0043-CX DOI-BLM-NV-W010-2010-0043-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W010-2010-0043-CX CX at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Oski Energy LLC Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Seismic Techniques Time Frame (days) Application Time 68 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office Humboldt River Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 6/2/2010

330

GRR/Section 5-NV-a - Drilling Well Development | Open Energy Information  

Open Energy Info (EERE)

5-NV-a - Drilling Well Development 5-NV-a - Drilling Well Development < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 5-NV-a - Drilling Well Development 05NVADrillingWellDevelopment.pdf Click to View Fullscreen Contact Agencies Nevada Division of Minerals Nevada Division of Water Resources Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) Triggers None specified Click "Edit With Form" above to add content 05NVADrillingWellDevelopment.pdf 05NVADrillingWellDevelopment.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A person may not drill or operate a geothermal well or drill an exploratory well without obtaining a permit from the Administrator of the Nevada

331

GRR/Section 5-FD-b - Drilling Pre-Application Process NV only | Open Energy  

Open Energy Info (EERE)

5-FD-b - Drilling Pre-Application Process NV only 5-FD-b - Drilling Pre-Application Process NV only < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 5-FD-b - Drilling Pre-Application Process NV only 05-FD-b - DrillingApplicationProcess.pdf Click to View Fullscreen Contact Agencies Bureau of Land Management United States Forest Service Regulations & Policies Energy Policy Act of 2005 Geothermal Steam Act of 1970 43 CFR 3261: Drilling Operations, Getting A Permit Triggers None specified Click "Edit With Form" above to add content 05-FD-b - DrillingApplicationProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

332

DOI-BLM-NV-C010-2012-0035-DNA | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-C010-2012-0035-DNA DOI-BLM-NV-C010-2012-0035-DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0035-DNA DNA at Dead Horse Wells Geothermal Area for Geothermal/Well Field {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Ormat Technologies Inc Geothermal Area Dead Horse Wells Geothermal Area Project Location California Project Phase Geothermal/Well Field Techniques Production Wells Comments Geothermal Drilling Permits 12-A-12, 54A-11, 62-11, and Sundry Notice Well 65-11 Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided

333

GRR/Section 14-NV-e - Groundwater Discharge Permit | Open Energy  

Open Energy Info (EERE)

GRR/Section 14-NV-e - Groundwater Discharge Permit GRR/Section 14-NV-e - Groundwater Discharge Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 14-NV-e - Groundwater Discharge Permit 14NVEGroundwaterDischargePermit.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Regulations & Policies NAC 445A NRS 445A Triggers None specified Click "Edit With Form" above to add content 14NVEGroundwaterDischargePermit.pdf 14NVEGroundwaterDischargePermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Nevada Division of Environmental Protection (NDEP) Bureau of Water Pollution Control is responsible for protecting Nevada water quality from

334

NV Energy (Northern Nevada Gas) - SureBet Business Energy Efficiency Rebate  

Broader source: Energy.gov (indexed) [DOE]

NV Energy (Northern Nevada Gas) - SureBet Business Energy NV Energy (Northern Nevada Gas) - SureBet Business Energy Efficiency Rebate Program (Nevada) NV Energy (Northern Nevada Gas) - SureBet Business Energy Efficiency Rebate Program (Nevada) < Back Eligibility Agricultural Commercial Construction Fed. Government Industrial Installer/Contractor Institutional Nonprofit Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Other Commercial Weatherization Manufacturing Home Weatherization Insulation Design & Remodeling Appliances & Electronics Water Heating Program Info State Nevada Program Type Utility Rebate Program Rebate Amount High Efficiency Boilers Input MBH $1.25 Boiler Reset Control Boiler $500 Boiler Tune-up Boiler $300 High Efficiency Furnaces Input MBH $1 Commercial Water Heaters Unit $150

335

DOI-BLM-NV-W030-20??-????-CX | Open Energy Information  

Open Energy Info (EERE)

NV-W030-20??-????-CX NV-W030-20??-????-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W030-20??-????-CX CX at Mcgee Mountain Geothermal Area for Geothermal/Exploration McGee Mountain Gravity Survey General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Geothermal Technical Partners Geothermal Area Mcgee Mountain Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Gravity Techniques Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office Humboldt River Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Relevant Numbers

336

GRR/Section 5-FD-b - Drilling Pre-Application Process NV only | Open Energy  

Open Energy Info (EERE)

5-FD-b - Drilling Pre-Application Process NV only 5-FD-b - Drilling Pre-Application Process NV only < GRR(Redirected from GRR/Section 5-FD-b - Drilling Application Process) Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 5-FD-b - Drilling Pre-Application Process NV only 05-FD-b - DrillingApplicationProcess.pdf Click to View Fullscreen Contact Agencies Bureau of Land Management United States Forest Service Regulations & Policies Energy Policy Act of 2005 Geothermal Steam Act of 1970 43 CFR 3261: Drilling Operations, Getting A Permit Triggers None specified Click "Edit With Form" above to add content 05-FD-b - DrillingApplicationProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

337

DOI-BLM-NV-W010-2011-0100-CX | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-W010-2011-0100-CX DOI-BLM-NV-W010-2011-0100-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W010-2011-0100-CX CX at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Ormat Nevada Inc. Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 149 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office BLM Winnemucca Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 1/31/2011

338

DOI-BLM-NV-C010-2012-0016-DNA | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-C010-2012-0016-DNA DOI-BLM-NV-C010-2012-0016-DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0016-DNA DNA at Salt Wells Geothermal Area for Geothermal/Well Field {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Ormat Technologies Inc Geothermal Area Salt Wells Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Production Wells Comments Geothermal Drilling Permit 85-5 Production Well Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM

339

GRR/Section 7-NV-c - State PUC Process | Open Energy Information  

Open Energy Info (EERE)

7-NV-c - State PUC Process 7-NV-c - State PUC Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-NV-c - State PUC Process 07NVCStatePUCProcess.pdf Click to View Fullscreen Contact Agencies Public Utilities Commission of Nevada Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) Practice Before the PUCN: NAC 703.481 to 703.845 Triggers None specified Click "Edit With Form" above to add content 07NVCStatePUCProcess.pdf 07NVCStatePUCProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative A Certificate of Public Convenience and Necessity (CPCN) is required for the development of both energy generation facilities and transmission

340

GRR/Section 6-NV-c - Drinking Water Permit | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 6-NV-c - Drinking Water Permit GRR/Section 6-NV-c - Drinking Water Permit < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6-NV-c - Drinking Water Permit 06NVCDrinkingWaterPermit.pdf Click to View Fullscreen Contact Agencies Nevada Division of Water Resources Nevada Division of Environmental Protection Public Utilities Commission of Nevada Regulations & Policies NRS 445A Water Controls NAC 445A Water Controls (Regulations) Triggers None specified Click "Edit With Form" above to add content 06NVCDrinkingWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative According to NRS 445A, the Nevada Division of Water Resources is charged

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

DOI-BLM-NV-C010-2012-0051-EA | Open Energy Information  

Open Energy Info (EERE)

-EA -EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0051-EA EA at Coyote Canyon Geothermal Area for Geothermal/Exploration Coyote Canyon South Geothermal Exploration Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Terra-Gen Power LLC Consultant EMPSi Geothermal Area Coyote Canyon Geothermal Area Project Location Churchill County, NV, Churchill County, NV Project Phase Geothermal/Exploration Techniques Exploratory Well Comments This EA covers an extension of a previously approved exploration project, "Coyote Canyon Geothermal Exploration Project." Exploration results indicated the resource may be to the south of the already approved area. The BLM determined that this new EA would be needed to cover this new land area proposed for disturbance.

342

GRR workshop at GRC scheduled for 10/2 in Reno, NV | OpenEI Community  

Open Energy Info (EERE)

GRR workshop at GRC scheduled for 10/2 in Reno, NV GRR workshop at GRC scheduled for 10/2 in Reno, NV Home > Groups > Geothermal Regulatory Roadmap Kyoung's picture Submitted by Kyoung(155) Contributor 6 September, 2012 - 09:05 GRC + workshop + GRR + Reno + October The GRR workshop at GRC has been scheduled for Tuesday, October 2, 2012 in Reno, NV. During the workshop, we will be reviewing project progress to date, analysis of information gathered, and potential future plans. For more information, please see the workshop wiki page. Groups: Geothermal Regulatory Roadmap Login to post comments Kyoung's blog Latest blog posts Kyoung Geothermal NEPA Workshop at GRC Posted: 14 Oct 2013 - 20:19 by Kyoung Jweers New Robust References! Posted: 7 Aug 2013 - 18:23 by Jweers 1 comment(s) 1 of 15 ›› Groups Menu You must login in order to post into this group.

343

DOI-BLM-NV-C010-2010-0016-EA | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-C010-2010-0016-EA DOI-BLM-NV-C010-2010-0016-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2010-0016-EA EA at Patua Geothermal Area for Geothermal/Well Field, Geothermal/Power Plant Patua Geothermal Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Vulcan Power Company Geothermal Area Patua Geothermal Area Project Location Fernley, Nevada Project Phase Geothermal/Well Field, Geothermal/Power Plant Techniques Airborne Electromagnetic Survey Time Frame (days) Application Time 417 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BOR, Nevada, Privately Held

344

DOI-BLM-NV-C010-2011-0517-DNA | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-C010-2011-0517-DNA DOI-BLM-NV-C010-2011-0517-DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2011-0517-DNA DNA at Dead Horse Wells Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Ormat Technologies Inc Geothermal Area Dead Horse Wells Geothermal Area Project Location California Project Phase Geothermal/Exploration Techniques Drilling Techniques Time Frame (days) Application Time 26 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates

345

GRR/Section 9-NV-a - State Environmental Process | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 9-NV-a - State Environmental Process GRR/Section 9-NV-a - State Environmental Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 9-NV-a - State Environmental Process 09NVAStateEnvironmentalProcess.pdf Click to View Fullscreen Contact Agencies Nevada State Clearinghouse Nevada Public Utilities Commission Nevada Division of Environmental Protection Regulations & Policies Utility Environmental Protection Act NAC 445C - Environmental Requirements Triggers None specified Click "Edit With Form" above to add content 09NVAStateEnvironmentalProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative

346

DOI-BLM-NV-W030-2010-0006-EA | Open Energy Information  

Open Energy Info (EERE)

DOI-BLM-NV-W030-2010-0006-EA DOI-BLM-NV-W030-2010-0006-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W030-2010-0006-EA EA at San Emidio Desert Geothermal Area for Geothermal/Exploration San Emidio Geothermal Exploration Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant US Geothermal Inc Consultant JBR Environmental Consultants Inc. Geothermal Area San Emidio Desert Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Drilling Methods, Flow Test Time Frame (days) NEPA Process Time 725 Participating Agencies Lead Agency DOE Funding Agency DOE Managing District Office Winnemucca Managing Field Office BLM Black Rock Field Office Funding Agencies none provided

347

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

July 19, 2002 July 19, 2002 EIS-0285-SA-95: Supplement Analysis Transmission System Vegetation Management Program July 19, 2002 EIS-0285-SA-94: Supplement Analysis Transmission System Vegetation Management Program, Covington District Substations July 19, 2002 EIS-0285-SA-96: Supplement Analysis Transmission System Vegetation Management Program, Snohomish District Substations July 19, 2002 EIS-0285-SA-71: Supplement Analysis Transmission System Vegetation Management Program, located in Umatilla and Sherman Counties, Oregon and Benton and Klickitat Counties, Washington July 19, 2002 EIS-0285-SA-70: Supplement Analysis Transmission System Vegetation Management Program July 8, 2002 EIS-0189: Notice of Intent Supplemental Environmental Impact Statement for Disposal of Immobilized

348

RAPID/Roadmap/12-WA-a | Open Energy Information  

Open Energy Info (EERE)

take wildlife from the wild without permission from the Washington State Department of Fish and Wildlife (WDFW). The WDFW issues Live Wildlife Taking Permits under WAC 232-12-064....

349

RAPID/Roadmap/11-WA-c | Open Energy Information  

Open Energy Info (EERE)

25-48-020. On Washington state lands it is unlawful for any entity of the state or a political subdivision to knowingly remove, alter, dig into, or excavate by use of any...

350

RAPID/Roadmap/3-WA-c | Open Energy Information  

Open Energy Info (EERE)

is required for occupancy of a highway right of way by facilities, including private lines. WAC 468-34-160. The process is governed by the Washington State Department of...

351

Cascade Apartments - Deep Energy Multifamily Retrofit , Kent, Washington (Fact Sheet)  

SciTech Connect (OSTI)

In December of 2009-10, King County Housing Authority (KCHA) implemented energy retrofit improvements in the Cascade multifamily community, located in Kent, Washington (marine climate.)This research effort involved significant coordination from stakeholders KCHA, WA State Department of Commerce, utility Puget Sound Energy, and Cascade tenants. This report focuses on the following three primary BA research questions : 1. What are the modeled energy savings using DOE low income weatherization approved TREAT software? 2. How did the modeled energy savings compare with measured energy savings from aggregate utility billing analysis? 3. What is the Savings to Investment Ratio (SIR) of the retrofit package after considering utility window incentives and KCHA capitol improvement funding.

Not Available

2014-02-01T23:59:59.000Z

352

Washington Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Washington nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State...

353

FUPWG Fall 2009 Washington Update  

Broader source: Energy.gov [DOE]

Presentation covers the 2009 Federal Utility Partnership Working Group (FUPWG) Washington update at the FUPWG meeting, held on November 18-19, 2009.

354

Recent developments: Washington focus  

SciTech Connect (OSTI)

Congress reconvened on January 23, but most of Washington`s January new involves the Administration. DOE sent two letters to USEC customers, awarded a contract for the independent financial review of the enrichment program, and released a plan for demonstrating AVLIS by 1992. A General Accounting Office (GAO) report investigating the impact of imports of Soviet EUP into the US was made public. Both Congress and the administration are reportedly considering a full-scope US-Soviet Agreement for Nuclear Cooperation. Finally, published reports indicate Congress may consider ending the customs user fee which levies a charge of 0.17% on the value of all imported goods. The fee is felt to violate the General Agreement on Tariffs and Trade (GATT) and is not based on recovering actual Customs costs for processing a good. The fee brings the Treasury over $700 million per year, but the business community plans to lobby hard for its outright elimination or a change in authority to collect the fee based on actual costs.

NONE

1990-02-01T23:59:59.000Z

355

Departmentaf Energy Washington, DC  

Broader source: Energy.gov (indexed) [DOE]

Departmentaf Departmentaf Energy Washington, DC 20585 MAR 4 1998 MEMORANDUM FOR: James H. Chafin, AL Robert Fisher, CH Steven Hamel, OR William Daubenspeck, LL James Hanley, SAN Robert Southworth, RL Harold Dixon, SR \ Lisa Jarr, FETC"/"',,,-' ( ~ ( ) ( I C{ \'"~V FROM: Paul A. Gottlieb'<,. ~ ' \ Assistant General Counsel . for Technology Transfer / and Intellectual Property SUBJECT: U.S. Competitiveness Provision. Except for the cases discussed further below, attached is the U.S. Competitiveness provision which you should begin providing as our initial negotiating position to inventors/contractors requesting identified and, advance patent waivers. Of course, it is not· expected that every inventor/contractor will agree to the exact language in the provision, in which case modifications to the provision can be made. In those cases where substantial changes are contemplated,

356

Washington, DC,20585  

Office of Legacy Management (LM)

>/gGq ' >/gGq ' ,, ' .. Department of Edgy Washington, DC,20585 ,I ' , APR 0 4 1995 The Honorable Patrick Ungaro 26 S. Phelps Street Youngstown, Ohio 44503 .' Dear );layor.Ungaro: Secretary of'Energy Hazel O'Leary has announced a new approach to openness in the Oepartment of Energy (DOE) and its coannunications with the public. In support of this initiative, we are pleased to forward the,enclosed information related to the former Ajax-Hagnethermic C,orp. site in your jurisdiction that performed work for DOE's predecessoragencies. This information is~provided for your information, use, and retention. DOE's Formerly Utilized Sites Remedial Action Program is responsible for identificationof sites used by DOE's predecessor agencies, determining their current radiological condition and, where it has authority, performing-

357

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

1, 2011 1, 2011 CX-005337: Categorical Exclusion Determination Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 03/01/2011 Location(s): Redmond, Washington Office(s): Energy Efficiency and Renewable Energy, National Energy Technology Laboratory February 24, 2011 Online Registration Dates Set for 2011 Hanford Tours RICHLAND, Wash. - The U.S. Department of Energy (DOE) will open online registration on March 8 for tours of the Hanford Site and on March 15 for B Reactor-specific tours. February 24, 2011 Praveen Thallapally | photo courtesy of Pacific Northwest National Lab 10 Questions for a Materials Chemist: Praveen Thallapally Dr. Thallapally gave us an inside look at how he's working to advance carbon capture and geothermal technologies, developing a new class of

358

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

January 16, 2004 January 16, 2004 EIS-0246-SA-37: Supplement Analysis Wildlife Mitigation Program, On the Spokane Indian Reservation, near Wellpinit, Stevens County, Washington November 10, 2003 EIS-0349: Record of Decision Electrical Interconnection of the BP Cherry Point Cogeneration Project October 2, 2003 EA-0307-SA-01: Supplement Analysis Colville Resident Trout Hatchery Project Supplement Analysis September 5, 2003 EIS-0349: Draft Environmental Impact Statement BP Cherry Point Cogeneration Project July 21, 2003 EIS-0317: Record of Decision Kangley-Echo Lake Transmission Line Project July 14, 2003 EIS-1069-SA-07: Supplement Analysis Yakima/Kilickitat Fisheries Project, Noxious Weed Control at Cle Elum and Jack Creek, Cle Elum Supplementation and Research Facility and Jack Creek

359

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

June 19, 2013 June 19, 2013 A Hanford site volunteer helps a Boy Scout practice the Pull, Aim, Squeeze, Sweep, or PASS, fire extinguishing technique at the Volpentest HAMMER Training & Education Center in Richland. Local Scouts Train with Hanford Safety Experts - 52 Boy Scouts Earn Merit Badges at the HAMMER Training Facility RICHLAND, Wash. - Hanford site services contractor Mission Support Alliance (MSA) hosted a unique opportunity for 52 local Boy Scouts at the Volpentest HAMMER Training & Education Center during two consecutive weekends recently. June 14, 2013 EA-1562-SA-1: Supplement Analysis Final Environmental Assessment of Construction and Operation of a Physical Sciences Facility at the Pacific Northwest National Laboratory, Richland, Washington June 4, 2013

360

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

August 2, 2004 August 2, 2004 EIS-0349: Final Environmental Impact Statement, Volume 2 BP Cherry Point Cogeneration Project Volume 2 August 2, 2004 EIS-0349: Final Environmental Impact Statement, Figures BP Cherry Point Cogeneration Project August 2, 2004 EIS-0349: Final Environmental Impact Statement, Appendices BP Cherry Point Cogeneration Project June 23, 2004 EIS-0026-SA-02: Supplement Analysis Disposal of Polychlorinated Biphenyl-Commingled Transuranic Waste at the Waste Isolation Pilot Plant April 7, 2004 EIS-0169-SA-08: Supplement Analysis Yakima/Klickitat Fisheries Project, Boone Pond Acclimation Site, Cle Elum, Kittitas County, Washington March 12, 2004 EA-1486: Final Environmental Assessment East and West Diversion Screening Proposal Methow Valley Irrigation District Project

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

December 14, 2001 December 14, 2001 EIS-0285-SA-35: Supplement Analysis Transmission System Vegetation Management Program December 3, 2001 EIS-0265-SA-72: Supplement Analysis Watershed Management Program - Yakima Basin Side Channels Project, Scatter Creek/Plum Creek Land Acquisition Phase II December 3, 2001 EIS-0285-SA-34: Supplement Analysis Transmission System Vegetation Management Program November 15, 2001 EIS-0285-SA-32: Supplement Analysis Watershed Management Program - Walla Walla County, Washington November 15, 2001 EIS-0265-SA-69: Supplement Analysis Watershed Management Program October 29, 2001 EIS-0265-SA-71: Supplement Analysis Watershed Management Program - Duncan Creek Channel Rehabilitation Project October 23, 2001 EIS-0265-SA-70: Supplement Analysis Watershed Management Program - Yakima Basin Side Channels Project, Scatter

362

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

18, 2011 18, 2011 Hanford to Host ISMS Safety Workshop in Kennewick: Abstracts Due in June for September Event RICHLAND, WASH. - The U.S. Department of Energy (DOE) at Hanford will hold its annual DOE Integrated Safety Management (ISM) Champions Workshop on September 12-15, 2011, at the Three Rivers Convention Center in Kennewick, Wash. May 17, 2011 EA-1731: Final Environmental Assessment Walla Walla-Tucannon River Transmission Line Rebuild Project, Walla Walla and Columbia Counties, Washington May 17, 2011 EA-1731: Mitigation Acton Plan Walla Walla-Tucannon River Transmission Line Rebuild Project May 17, 2011 EA-1731: Finding of No Significant Impact Walla Walla-Tucannon River Transmission Line Rebuild Project May 13, 2011 CX-005809: Categorical Exclusion Determination

363

Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

September 5, 2002 September 5, 2002 EIS-0285-SA-107: Supplement Analysis Transmission System Vegetation Management Program September 2, 2002 EIS-0169-SA-05: Supplement Analysis Yakima/Klickitat Fisheries Project, Cle Elum, Kittitas County, Washington August 30, 2002 EIS-0332: Final Environmental Impact Statement McNary-John Day Transmission Line Project August 29, 2002 EIS-0285-SA-99: Supplement Analysis Transmission System Vegetation Management Program Final Environmental Impact Statement - Olympia-Grand Coulee No.1 August 22, 2002 EIS-0285-SA-105: Supplement Analysis Transmission System Vegetation Management Program August 21, 2002 EIS-0285-SA-104: Supplement Analysis Transmission System Vegetation Management Program August 1, 2002 EIS-0344: Draft Envrionmental Impact Statement

364

Microsoft Word - washington.doc  

Gasoline and Diesel Fuel Update (EIA)

Washington Washington NERC Region(s) ....................................................................................................... WECC Primary Energy Source........................................................................................... Hydroelectric Net Summer Capacity (megawatts) ....................................................................... 30,478 10 Electric Utilities ...................................................................................................... 26,498 5 Independent Power Producers & Combined Heat and Power ................................ 3,979 26 Net Generation (megawatthours) ........................................................................... 103,472,729 15

365

Biofuels in Oregon and Washington  

E-Print Network [OSTI]

PNNL-17351 Biofuels in Oregon and Washington A Business Case Analysis of Opportunities and Challenges Prepared by Pacific Northwest National Laboratory #12;#12;Biofuels in Oregon and Washington, particularly in light of the recent growth experienced by the biofuels industry in the Midwest. Policymakers

366

Reno, NV, 1976). 38. M. C. Reheis and R. Kihl, J. Geophys. Res. 100,  

E-Print Network [OSTI]

of the Yucca Mountain Unsaturated and Sat- urated Zone Hydrology to Climate Change, 1996 Milestone report 3GCA102M (U.S. Geological Sur- vey­Yucca Mountain Project Branch, Las Vegas, NV, 1997). 42. J. M. Barnola National Laboratory. Part of this work was supported and managed by DOE's Yucca Mountain Site

367

Coherent interference effects in a nano-assembled diamond NV center  

E-Print Network [OSTI]

-Packard Laboratories, 1501 Page Mill Rd, Palo Alto, CA 94304, USA Presently with Hewlett-Packard Laboratories, 1501 Page Mill Rd, Palo Alto, CA 94304, USA paul.barclay@hp.com Abstract: Diamond nanocrystals containing NV, P. Olivero, A. D. Greentree, S. Prawer, F. Jelezko, and P. Hemmer, "Coherent Population Trapping

Painter, Oskar

368

BP Energy Company (Washington) | Open Energy Information  

Open Energy Info (EERE)

Company (Washington) Jump to: navigation, search Name: BP Energy Company Place: Washington References: EIA Form EIA-861 Final Data File for 2010 - File220101 EIA Form 861 Data...

369

Washington: Graphene Nanostructures for Lithium Batteries Recieves...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Washington: Graphene Nanostructures for Lithium Batteries Recieves 2012 R&D 100 Award Washington: Graphene Nanostructures for Lithium Batteries Recieves 2012 R&D 100 Award February...

370

Washington -- SEP Data Dashboard | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Data Dashboard Washington -- SEP Data Dashboard The data dashboard for Washington -- SEP, a partner in the Better Buildings Neighborhood Program. bbnpbban0004447pmcdashboardy...

371

EIS-0467: Hanford Site Natural Gas Pipeline, Richland, WA  

Broader source: Energy.gov [DOE]

DOE announces its intent to prepare an EIS for the Acquisition of a Natural Gas Pipeline and Natural Gas Utility Service at the Hanford Site, Richland, Washington (Natural Gas Pipeline or NGP EIS), and initiate a 30-day public scoping period.

372

Governor STATE OF WASHINGTON O F F I C E O F T H E G O V E R  

Broader source: Energy.gov (indexed) [DOE]

CHRISTINE 0. GRECOIRE CHRISTINE 0. GRECOIRE Governor STATE OF WASHINGTON O F F I C E O F T H E G O V E R N O R P O . Box 40002 Olympia, Washington 98504-0002 (360) 753-6780 www.governor.wa.gov March 12,2009 The Honorable Steven Chu, Secretary U.S. Department of Energy 1000 Independence Avenue Southwest Washington, D.C. 20585 Re: State Energy Program Assurances, Section 410 American Recovery and Reinvestment Act of 2009 Dear Secretary Chu: Section 410 of the American Recovery and Reinvestment Act of 2009, (H.R. l)(ARRA) provides that finding under the ARRA will be made available after I notify you that I have obtained certain assurances. Section 410(1) asks that I notify you that I have obtained assurances that the following will occur: The applicable State regulatory authority will seek to implement, in appropriate

373

Transformative Wave Technologies Kent, Washington  

E-Print Network [OSTI]

Transformative Wave Technologies Kent, Washington www.transformativewave.com #12;#12;North America are shifted to off peak times #12;#12;Transformative Wave Technologies www.transformativewave.com #12

California at Davis, University of

374

Recovery Act State Memos Washington  

Broader source: Energy.gov (indexed) [DOE]

Washington Washington For questions about DOE's Recovery Act activities, please contact the DOE Recovery Act Clearinghouse: 1-888-DOE-RCVY (888-363-7289), Monday through Friday, 9 a.m. to 7 p.m. Eastern Time https://recoveryclearinghouse.energy.gov/contactUs.htm. All numbers and projects listed as of June 1, 2010 TABLE OF CONTENTS RECOVERY ACT SNAPSHOT................................................................................... 1 FUNDING ALLOCATION TABLE.............................................................................. 2 ENERGY EFFICIENCY ............................................................................................... 3 RENEWABLE ENERGY ............................................................................................. 6

375

W(A)94-022 STATEMENT OF CONSIDERATIONS  

Broader source: Energy.gov (indexed) [DOE]

4-022 4-022 STATEMENT OF CONSIDERATIONS Request by Cummins Power Generation, Inc., for an Advance Waiver of Domestic and Foreign Patent Rights to Inventions made under a contract entitled "Utility Scale Joint Venture Project," between Cummins Power Generation, Inc. and Sandia National Laboratories (Contract No. AB- 8717B) under Management and Operations Contract DE-AL04-84AL85000, DOE Docket No. W(A)94-022. The petitioner, Cummins Power Generation, Inc., (CPG) has requested a waiver of all domestic and foreign patent rights to inventions which it may conceive or first actually reduce to practice in the course of work under the Utility Scale Joint Venture Project between Petitioner and Sandia National Laboratories (Sandia) under contract No. AB- 8717B. Sandia is operated by Sandia Corporation for the U.S. Department of Energy (DOE).

376

W(A)93-013 STATEMENT OF CONSIDERATIONS  

Broader source: Energy.gov (indexed) [DOE]

13 13 STATEMENT OF CONSIDERATIONS Request by AlliedSignal, Inc. for Waiver of Domestic and Foreign Patent Rights to inventions that may arise under Contract No. DE-FC04-93AL94462 between the United States Department of Energy (DOE) and AlliedSignal, Inc. DOE Docket: W(A)93-013 The Petitioner, AlliedSignal, Inc. (AlliedSignal), has requested a waiver of all domestic and foreign patent rights to inventions which it may conceive or reduce to practice in the course of work under Contract No. DE-FC04-93AL94462, a Cooperative Agreement with DOE. The project period is May 14, 1993 through May 13, 1996. The Cooperative Agreement covers work in designing a biological/chemical production process for caprolactam using microbial bioprocesses that convert cyclohexane to

377

W(A)93-039 STATEMENT OF CONSIDERATIONS  

Broader source: Energy.gov (indexed) [DOE]

39 39 STATEMENT OF CONSIDERATIONS Request by Air Products and Chemicals, Inc. for Waiver of Domestic and Foreign Patent Rights to inventions that may arise under Contract No. DE-FC04-93AL94461 between the United States Department of Energy (DOE) and Air Products and Chemicals, Inc. DOE Docket: W(A)93-039. The Petitioner, Air Products and Chemicals, Inc., (Air Products) has requested a waiver of all domestic and foreign patent rights to inventions which it may conceive or reduce to practice in the course of work under Contract No. DE-FC04-93AL94461 a Cooperative Agreement with DOE. The contract covers a four phase development program for a recently patented technology developed at Air Products entitled "Novel Selective Surface Flow (SSF T ) Membranes for the

378

Better Buildings Neighborhood Program: Bainbridge Island, Washington  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Bainbridge Bainbridge Island, Washington to someone by E-mail Share Better Buildings Neighborhood Program: Bainbridge Island, Washington on Facebook Tweet about Better Buildings Neighborhood Program: Bainbridge Island, Washington on Twitter Bookmark Better Buildings Neighborhood Program: Bainbridge Island, Washington on Google Bookmark Better Buildings Neighborhood Program: Bainbridge Island, Washington on Delicious Rank Better Buildings Neighborhood Program: Bainbridge Island, Washington on Digg Find More places to share Better Buildings Neighborhood Program: Bainbridge Island, Washington on AddThis.com... Better Buildings Residential Network Progress Stories Interviews Videos Events Quick Links to Partner Information AL | AZ | CA | CO | CT FL | GA | IL | IN | LA ME | MD | MA | MI | MO

379

Better Buildings Neighborhood Program: Washington - SEP  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Better Buildings Partners Better Buildings Partners Printable Version Share this resource Send a link to Better Buildings Neighborhood Program: Washington - SEP to someone by E-mail Share Better Buildings Neighborhood Program: Washington - SEP on Facebook Tweet about Better Buildings Neighborhood Program: Washington - SEP on Twitter Bookmark Better Buildings Neighborhood Program: Washington - SEP on Google Bookmark Better Buildings Neighborhood Program: Washington - SEP on Delicious Rank Better Buildings Neighborhood Program: Washington - SEP on Digg Find More places to share Better Buildings Neighborhood Program: Washington - SEP on AddThis.com... Better Buildings Residential Network Progress Stories Interviews Videos Events Quick Links to Partner Information AL | AZ | CA | CO | CT FL | GA | IL | IN | LA

380

DOI-BLM-NV-C010-2009-0018-EA | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » DOI-BLM-NV-C010-2009-0018-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2009-0018-EA EA at Soda Lake Geothermal Area for Geothermal/Well Field Environmental Assessment: Magma Energy Soda Lake Well 41B-33 General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Magma Energy Geothermal Area Soda Lake Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Production Wells Time Frame (days) Application Time 112 NEPA Process Time 3 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

DOI-BLM-NV-W010-2011-0004-CX | Open Energy Information  

Open Energy Info (EERE)

W010-2011-0004-CX W010-2011-0004-CX (Redirected from DOI-BL-NV-W010-2011-0004-CX) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W010-2011-0004-CX CX at Dixie Valley Geothermal Area for Geothermal/Exploration, AltaRock Seismic Survey General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant AltaRock Energy Inc Geothermal Area Dixie Valley Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Passive Seismic Techniques Time Frame (days) Application Time 160 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office Humboldt River Funding Agencies none provided Surface Manager BLM

382

DOI-BLM-NV-C010-2009-0030-CX | Open Energy Information  

Open Energy Info (EERE)

09-0030-CX 09-0030-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2009-0030-CX CX at Carson Lake Corral Geothermal Area for Geothermal/Exploration, {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Vulcan Power Company Geothermal Area Carson Lake Corral Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Thermal Gradient Holes Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Relevant Numbers Lead Agency Doc Number DOI-BLM-NV-W010-2009-0030-CX

383

ENVIRONMENTAL ASSESSMENT DOI-BLM-NV-W010-2012-0057-EA DOE/EA-1944  

Broader source: Energy.gov (indexed) [DOE]

ASSESSMENT ASSESSMENT DOI-BLM-NV-W010-2012-0057-EA DOE/EA-1944 Brady Hot Springs Well 15-12 Hydro-Stimulation January 2013 Prepared by: U.S. Department of the Interior Bureau of Land Management Winnemucca District Office 5100 E. Winnemucca Blvd. Winnemucca, Nevada 89445-2921 Cooperating Agency: U.S. Department of Energy Golden Field Office 1617 Cole Blvd. Golden, Colorado 80401 Winnemucca District Office / Nevada BLM Humboldt River Field Office/Nevada DOI-BLM-NV-W010-2012-0057-EA DOE/EA-1944 It is the mission of the Bureau of Land Management to sustain the health, diversity, and productivity of the public lands for the use and enjoyment of present and future generations. TABLE OF CONTENTS 1.0 INTRODUCTION ...................................................................................................1

384

DOI-BLM-NV-C010-2012-0058-DNA | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » DOI-BLM-NV-C010-2012-0058-DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0058-DNA DNA at Dixie Meadows Geothermal Area for Geothermal/Well Field {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Ormat Technologies Inc Geothermal Area Dixie Meadows Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Observation Wells Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided

385

DOI-BLM-NV-W030-2012-0011-DNA | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » DOI-BLM-NV-W030-2012-0011-DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W030-2012-0011-DNA DNA at San Emidio Desert Geothermal Area for Geothermal/Well Field 2012 San Emidio Geothermal 2 Observation Wells General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant US Geothermal Inc Geothermal Area San Emidio Desert Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Observation Wells Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office BLM Black Rock Field Office Funding Agencies none provided

386

DOI-BLM-NV-B020-2011-0048-CX | Open Energy Information  

Open Energy Info (EERE)

form form View source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit with form History Facebook icon Twitter icon » DOI-BLM-NV-B020-2011-0048-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-B020-2011-0048-CX CX at Silver Peak Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant CHB Metal Foote Corporation Geothermal Area Silver Peak Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 36 Participating Agencies Lead Agency BLM Funding Agency none provided

387

GRR/Section 3-NV-a - State Land Leasing Process and Land Access | Open  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » GRR/Section 3-NV-a - State Land Leasing Process and Land Access < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 3-NV-a - State Land Leasing Process and Land Access 03NVAStateLandLeasingProcess.pdf Click to View Fullscreen Contact Agencies Nevada Division of State Lands Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) NRS 322.010-322.040 Leases for Extraction of Oil, Coal, Gas or Geothermal Resources Triggers None specified Click "Edit With Form" above to add content 03NVAStateLandLeasingProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range.

388

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project  

Broader source: Energy.gov (indexed) [DOE]

73: W.A. Parish Post-Combustion CO2 Capture and Sequestration 73: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX SUMMARY This EIS evaluates the environmental impacts of a proposal to provide financial assistance for a project proposed by NRG Energy, Inc (NRG). DOE selected NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project for a financial assistance award through a competitive process under the Clean Coal Power Initiative Program. NRG would design, construct and operate a commercial-scale carbon dioxide (CO2) capture facility at its existing W.A. Parish Generating Station in Fort Bend County, Texas; deliver the CO2 via a new pipeline to the existing West Ranch oil field in Jackson

389

Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) | Department  

Broader source: Energy.gov (indexed) [DOE]

Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) June 12, 2013 DOE referred the matter of Fisher & Paykel Appliances residential clothes washer, model WA42T26GW1, to the U.S. Environmental Protection Agency, brand manager for the ENERGY STAR Program, for appropriate action after DOE testing showed that the model does not meet the ENERGY STAR specification. Fisher & Paykel Appliances: ENERGY STAR Referral (WA42T26GW1) More Documents & Publications Regulatory Burden RFI DOE response to questions from AHAM on the supplemental proposed test procedure for residential clothes washers Scoping Study to Evaluate Feasibility of National Databases for EM&V Documents and Measure Savings: Appendices

390

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project  

Broader source: Energy.gov (indexed) [DOE]

EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX EIS-0473: W.A. Parish Post-Combustion CO2 Capture and Sequestration Project (PCCS), Fort Bend County, TX SUMMARY This EIS evaluates the environmental impacts of a proposal to provide financial assistance for a project proposed by NRG Energy, Inc (NRG). DOE selected NRG's proposed W.A. Parish Post-Combustion CO2 Capture and Sequestration Project for a financial assistance award through a competitive process under the Clean Coal Power Initiative Program. NRG would design, construct and operate a commercial-scale carbon dioxide (CO2) capture facility at its existing W.A. Parish Generating Station in Fort Bend County, Texas; deliver the CO2 via a new pipeline to the existing West Ranch oil field in Jackson

391

EIS-0189: Tank Waste Remediation System (TWRS), Richland, WA (Programmatic)  

Broader source: Energy.gov [DOE]

This environmental impact statement evaluates the Department of Energy (DOE)'s, in cooperation with the Washington State Department of Ecology (Ecology), decisions on how to properly manage and dispose of Hanford Site tank waste and encapsulated cesium and strontium to reduce existing and potential future risk to the public, Site workers, and the environment. The waste includes radioactive, hazardous, and mixed waste currently stored in 177 underground storage tanks, approximately 60 other smaller active and inactive miscellaneous underground storage tanks (MUSTs), and additional Site waste likely to be added to the tank waste, which is part of the tank farm system. In addition, DOE proposes to manage and dispose of approximately 1,930 cesium and strontium capsules that are by-products of tank waste. The tank waste and capsules are located in the 200 Areas of the Hanford Site near Richland, Washington.

392

Identifying Challenging Operating Hours for Solar Intergration in the NV Energy System  

SciTech Connect (OSTI)

Abstract-- In this paper, the ability of the Nevada (NV) Energy generation fleet to meet its system balancing requirements under different solar energy penetration scenarios is studied. System balancing requirements include capacity, ramp rate, and ramp duration requirements for load following and regulation. If, during some operating hours, system capability is insufficient to meet these requirements, there is certain probability that the balancing authoritys control and reliability performance can be compromised. These operating hours are considered as challenging hours. Five different solar energy integration scenarios have been studied. Simulations have shown that the NV Energy system will be potentially able to accommodate up to 942 MW of solar photovoltaic (PV) generation. However, the existing generation scheduling procedure should be adjusted to make it happen. Fast-responsive peaker units need to be used more frequently to meet the increasing ramping requirements. Thus, the NV Energy system operational cost can increase. Index TermsSolar Generation, Renewables Integration, Balancing Process, Load Following, Regulation.

Etingov, Pavel V.; Lu, Shuai; Guo, Xinxin; Ma, Jian; Makarov, Yuri V.; Chadliev, Vladimir; Salgo, Richard

2012-05-09T23:59:59.000Z

393

Microbial community changes during sustained Cr(VI) reduction at the 100H site in Hanford, WA  

E-Print Network [OSTI]

at the 100H site in Hanford, WA Romy Chakraborty 1 , Eoin Lcontaminated aquifer at the Hanford (WA) 100H site in 2004.Cr(VI) reduction at Hanford, and a comparison of the

Chakraborty, Romy

2010-01-01T23:59:59.000Z

394

Washington Biodiesel | Open Energy Information  

Open Energy Info (EERE)

Logo: Washington Biodiesel Name Washington Biodiesel Address 3401 Fremont Avenue N. Place Seattle, Washington Zip 98103 Sector Biofuels Product Aims to grow biodiesel feedstock Website http://wabiodiesel.com/ Coordinates 47.6495905°, -122.3497956° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":47.6495905,"lon":-122.3497956,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

395

Why sequence Bacteria from Lake Washington?  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

bacteria from Lake Washington? bacteria from Lake Washington? Previous collaborations between the University of Washington team and the DOE JGI involving both single genome and metagenomic sequencing have greatly enhanced the community's ability to explore the diversity of bacteria functionally active in metabolism of single carbon compounds, known as methylotrophs, isolated from Lake Washington (Seattle, Washington) sediment. Sequencing genomes of 50 methylotroph isolates from the Lake Washington will further enhance the methylotroph community knowledge database providing a much higher level of resolution of global (meta)transcriptomic and (meta)proteomic analyses, as well as species interaction studies, informing a better understanding of biogeochemical cycling of carbon and nitrogen.

396

Type B Accident Investigation At Washington Closure Hanford,...  

Broader source: Energy.gov (indexed) [DOE]

Investigation At Washington Closure Hanford, LLC, Employee Fall Injury on July 1, 2009, At The 336 Building, Hanford Site, Washington Type B Accident Investigation At Washington...

397

NEURAL NETWORKS FOR DISCRETE TOMOGRAPHY K.J. Batenburg a W.A. Kosters b  

E-Print Network [OSTI]

NEURAL NETWORKS FOR DISCRETE TOMOGRAPHY K.J. Batenburg a W.A. Kosters b a Mathematical Institute of crystalline solids at atomic resolution from electron microscopic images can be considered the ``holy grail

Kosters, Walter

398

DOE Zero Energy Ready Home Case Study: TC Legend Homes, Bellingham, WA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home in Bellingham, WA, that achieves HERS 43 without PV or HERS 13 with 3.2 kW of PV.

399

EIS-0456: Cushman Hydroelectric Project, Tacoma, Washington  

Broader source: Energy.gov [DOE]

This EIS is for the design and construction of certain components of the Cushman Hydroelectric Project in Mason County, Washington.

400

DOI-BLM-NV-C010-2010-0006-EA | Open Energy Information  

Open Energy Info (EERE)

-EA -EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2010-0006-EA EA at Gabbs Valley Geothermal Area for Geothermal/Exploration Gabbs Valley and Dead Horse Wells Geothermal Exploration Projects General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Ormat Technologies Inc Consultant Environmental Management Associates Geothermal Area Gabbs Valley Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Downhole Techniques, Drilling Techniques, Exploration Drilling, Well Testing Techniques Time Frame (days) Application Time 363 NEPA Process Time 363 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

DOI-BLM-NV-B020-2011-0026-EA | Open Energy Information  

Open Energy Info (EERE)

26-EA 26-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-B020-2011-0026-EA EA at Silver Peak Geothermal Area for Geothermal/Exploration Clayton Valley Geothermal Exploration Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Ram Power Consultant EPG, Inc., Environmental Management Associates Geothermal Area Silver Peak Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Drilling Techniques, Exploration Drilling, Well Testing Techniques Comments Project abandoned; Unitization #: NVN-89376X Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Battle Mountain

402

DOI-BLM-NV-B020-2008-????-CX | Open Energy Information  

Open Energy Info (EERE)

CX CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-B020-2008-????-CX CX at Silver Peak Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Sierra Geothermal Power Geothermal Area Silver Peak Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 27 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Battle Mountain Managing Field Office BLM Tonopah Field Office Funding Agencies none provided Surface Manager none provided Mineral Manager none provided Selected Dates Application Date 9/29/2008

403

DOI-BLM-NV-B020-2008-????-?? | Open Energy Information  

Open Energy Info (EERE)

?? ?? Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-B020-2008-????-?? {{{EnvironmentalAnalysisType}}} at Reese River Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type Applicant Sierra Geothermal Power Geothermal Area Reese River Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Seismic Techniques, Thermal Gradient Holes Time Frame (days) Application Time 0 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Battle Mountain Managing Field Office BLM Mount Lewis Field Office Funding Agencies none provided Surface Manager none provided

404

NV Energy (Southern Nevada) - SureBet Business Energy Efficiency Rebate  

Broader source: Energy.gov (indexed) [DOE]

Southern Nevada) - SureBet Business Energy Efficiency Southern Nevada) - SureBet Business Energy Efficiency Rebate Program NV Energy (Southern Nevada) - SureBet Business Energy Efficiency Rebate Program < Back Eligibility Agricultural Commercial Construction Fed. Government Industrial Installer/Contractor Institutional Local Government Nonprofit Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heating Appliances & Electronics Commercial Lighting Lighting Manufacturing Windows, Doors, & Skylights Program Info State Nevada Program Type Utility Rebate Program Rebate Amount '''Existing Facilities''' T-8 Lamps: $2 - $7/lamp T-8/T-5 High Bay Replacement for HID: $0.30/watt reduced Delamping of T-12: $4 - $9

405

DOI-BLM-NV-C010-2010-0010-EA | Open Energy Information  

Open Energy Info (EERE)

EA EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2010-0010-EA EA at Dixie Valley Geothermal Area for Geothermal/Exploration Coyote Canyon and Dixie Meadows Geothermal Exploration General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Terra-Gen Power LLC Consultant CH2M Hill Ltd Geothermal Area Dixie Valley Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Downhole Techniques, Drilling Techniques, Exploration Drilling, Well Testing Techniques Time Frame (days) Application Time 265 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater

406

DOI-BLM-NV-C010-2011-0516-EA | Open Energy Information  

Open Energy Info (EERE)

516-EA 516-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2011-0516-EA EA at Dixie Meadows Geothermal Area for Geothermal/Exploration, Geothermal/Well Field Dixie Meadows Geothermal Exploration Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Ormat Technologies Inc Consultant JBR Environmental Consultants, Inc. Geothermal Area Dixie Meadows Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration, Geothermal/Well Field Techniques Drilling Techniques, Thermal Gradient Holes Time Frame (days) Application Time 308 NEPA Process Time 510 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City

407

DOI-BLM-NV-C010-2012-0046-DNA | Open Energy Information  

Open Energy Info (EERE)

-DNA -DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0046-DNA DNA at Tungsten Mountain Geothermal Area for Geothermal/Well Field {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Ormat Technologies Inc Geothermal Area Tungsten Mountain Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Observation Wells Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Decision Document Date 4/16/2012 Relevant Numbers

408

DOI-BLM-NV-C010-2011-0016-EA | Open Energy Information  

Open Energy Info (EERE)

EA EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2011-0016-EA EA at Patua Geothermal Area for Well Field Patua Geothermal Project Phase II General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Gradient Resources Consultant Panorama Environmental, Inc. Geothermal Area Patua Geothermal Area Project Location Fernley, Nevada Project Phase Well Field Techniques Exploratory Well, Thermal Gradient Holes Time Frame (days) NEPA Process Time 327 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Nevada Managing Field Office Carson City Funding Agencies none provided Surface Manager BLM, BOR Mineral Manager BLM Selected Dates

409

Microsoft Word - DRAFT DSW NV PA 12_12_13 lmm  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

12/12/13 PROGRAMMATIC AGREEMENT AMONG THE U.S. DEPARTMENT OF ENERGY-WESTERN AREA POWER ADMINISTRATION, ADVISORY COUNCIL ON HISTORIC PRESERVATION, NEVADA STATE HISTORIC PRESERVATION OFFICER, NEVADA STATE LANDS DEPARTMENT, BUREAU OF LAND MANAGEMENT, BUREAU OF RECLAMATION, AND NATIONAL PARK SERVICE REGARDING MAINTENANCE AND MINOR CONSTRUCTION ACTIVITIES AT EXISTING WESTERN TRANSMISSION LINES, FACILITIES AND PROPERTIES IN NEVADA WHEREAS, the United States Department of Energy, Western Area Power Administration (Western) operates and maintains, through its Desert Southwest Regional Office (DSW) and Sierra Nevada Regional Office (SNR), an extensive electrical power delivery system throughout the state of Nevada (NV), which includes transmission lines, substations, communication sites and ancillary

410

DOI-BLM-NV-C010-2012-0068-DNA | Open Energy Information  

Open Energy Info (EERE)

DNA DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0068-DNA DNA at Tungsten Mountain Geothermal Area for Geothermal/Well Field {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Ormat Technologies Inc Geothermal Area Tungsten Mountain Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Observation Wells Comments Geothermal Drilling Permit Well # 14-23 Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates

411

DOI-BLM-NV-C010-2013-0020-DNA | Open Energy Information  

Open Energy Info (EERE)

DNA DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2013-0020-DNA DNA at Patua Geothermal Area for Geothermal/Well Field Gradient Resources Geothermal Drilling Permit General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Gradient Resources Geothermal Drilling Permit Application Well 14-28 Geothermal Area Patua Geothermal Area Project Location Fernley, Nevada Project Phase Geothermal/Well Field Techniques Production Wells Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BOR Mineral Manager BLM Selected Dates

412

DOI-BLM-NV-C010-2012-0029-EA | Open Energy Information  

Open Energy Info (EERE)

29-EA 29-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0029-EA EA at Tungsten Mountain Geothermal Area for Geothermal/Well Field Tungsten Mountain Geothermal Exploration Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Ormat Technologies Inc Consultant Environmental Management Associates Geothermal Area Tungsten Mountain Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Downhole Techniques, Drilling Techniques, Exploration Drilling, Well Testing Techniques Time Frame (days) NEPA Process Time 407 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City

413

DOI-BLM-NV-B020-2010-0106-CX | Open Energy Information  

Open Energy Info (EERE)

-0106-CX -0106-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-B020-2010-0106-CX CX at Alum Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Sierra Geothermal Power Geothermal Area Alum Geothermal Area Project Location California Project Phase Geothermal/Exploration Techniques Hyperspectral Imaging, Magnetic Techniques, Magnetotellurics, Slim Holes, Z-Axis Tipper Electromagnetics Comments airborne thermal survey Time Frame (days) Application Time 182 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Battle Mountain Managing Field Office BLM Tonopah Field Office

414

Secretary Moniz's Remarks at the Washington Auto Show-- As Delivered  

Broader source: Energy.gov [DOE]

Secretary Moniz's remarks, as delivered, at the 2015 Washington Auto Show in Washington, D.C. on January 22, 2015.

415

Independent Activity Report, Washington River Protection Solutions -  

Broader source: Energy.gov (indexed) [DOE]

Washington River Protection Solutions Washington River Protection Solutions - September 2010 Independent Activity Report, Washington River Protection Solutions - September 2010 September 2010 Participation in the Washington River Protection Solutions, LLC Integrated Safety Management System Annual Review The U.S. Department of Energy, Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), participated in the review of the Washington River Protection Solutions, LLC Integrated Safety Management System Annual Review for 2010. The review was conducted during the period of August 23 to September 2, 2010, and focused on six functional areas: corrective action management, work planning and control, radiological protection, environmental protection, emergency preparedness, and

416

NV Energy Large-Scale Photovoltaic Integration Study: Intra-Hour Dispatch and AGC Simulation  

SciTech Connect (OSTI)

The uncertainty and variability with photovoltaic (PV) generation make it very challenging to balance power system generation and load, especially under high penetration cases. Higher reserve requirements and more cycling of conventional generators are generally anticipated for large-scale PV integration. However, whether the existing generation fleet is flexible enough to handle the variations and how well the system can maintain its control performance are difficult to predict. The goal of this project is to develop a software program that can perform intra-hour dispatch and automatic generation control (AGC) simulation, by which the balancing operations of a system can be simulated to answer the questions posed above. The simulator, named Electric System Intra-Hour Operation Simulator (ESIOS), uses the NV Energy southern system as a study case, and models the systems generator configurations, AGC functions, and operator actions to balance system generation and load. Actual dispatch of AGC generators and control performance under various PV penetration levels can be predicted by running ESIOS. With data about the load, generation, and generator characteristics, ESIOS can perform similar simulations and assess variable generation integration impacts for other systems as well. This report describes the design of the simulator and presents the study results showing the PV impacts on NV Energy real-time operations.

Lu, Shuai; Etingov, Pavel V.; Meng, Da; Guo, Xinxin; Jin, Chunlian; Samaan, Nader A.

2013-01-02T23:59:59.000Z

417

NV energy electricity storage valuation : a study for the DOE Energy Storage Systems program.  

SciTech Connect (OSTI)

This study examines how grid-level electricity storage may benefit the operations of NV Energy, and assesses whether those benefits are likely to justify the cost of the storage system. To determine the impact of grid-level storage, an hourly production cost model of the Nevada Balancing Authority (%22BA%22) as projected for 2020 was created. Storage was found to add value primarily through the provision of regulating reserve. Certain storage resources were found likely to be cost-effective even without considering their capacity value, as long as their effectiveness in providing regulating reserve was taken into account. Giving fast resources credit for their ability to provide regulating reserve is reasonable, given the adoption of FERC Order 755 (%22Pay-for-performance%22). Using a traditional five-minute test to determine how much a resource can contribute to regulating reserve does not adequately value fast-ramping resources, as the regulating reserve these resources can provide is constrained by their installed capacity. While an approximation was made to consider the additional value provided by a fast-ramping resource, a more precise valuation requires an alternate regulating reserve methodology. Developing and modeling a new regulating reserve methodology for NV Energy was beyond the scope of this study, as was assessing the incremental value of distributed storage.

Ellison, James F.; Bhatnagar, Dhruv; Samaan, Nader [Pacific Northwest National Laboratory, Richland, WA; Jin, Chunlian [Pacific Northwest National Laboratory, Richland, WA

2013-06-01T23:59:59.000Z

418

Meteorological Data Report Quinault Indian Reservation (vic. Point Grenville), Washington  

Open Energy Info (EERE)

Quinault Quinault Description: Data from file(s) Y:\5000\shared\Anemometer_Loan_Programs\WPA.NA.Loans\Quinault #3 - WA\Wind Data\Quinault-Pt Grenville 050420.csv Y:\5000\shared\Anemometer_Loan_Programs\WPA.NA.Loans\Quinault #3 - WA\Wind Data\Quinault-Pt Grenville 040722.csv Y:\5000\shared\Anemometer_Loan_Programs\WPA.NA.Loans\Quinault #3 - WA\Wind Data\Quinault-Pt Grenville 040826.csv Y:\5000\shared\Anemometer_Loan_Programs\WPA.NA.Loans\Quinault #3 - WA\Wind Data\Quinault-Pt Grenville 041006.csv Y:\5000\shared\Anemometer_Loan_Programs\WPA.NA.Loans\Quinault #3 - WA\Wind Data\Quinault-Pt Grenville 041105.csv Y:\5000\shared\Anemometer_Loan_Programs\WPA.NA.Loans\Quinault #3 - WA\Wind Data\Quinault-Pt Grenville 041203.csv Y:\5000\shared\Anemometer_Loan_Programs\WPA.NA.Loans\Quinault #3 - WA\Wind Data\Quinault-Pt Grenville 050112.csv

419

Categorical Exclusion Determinations: Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Washington Washington Categorical Exclusion Determinations: Washington Location Categorical Exclusion Determinations issued for actions in Washington. DOCUMENTS AVAILABLE FOR DOWNLOAD November 22, 2013 CX-010734: Categorical Exclusion Determination Covington District Culvert Replacements CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): Washington Offices(s): Bonneville Power Administration November 19, 2013 CX-010735: Categorical Exclusion Determination Grand Coulee-Bell No.5 Dead End Insulator Replacement Project CX(s) Applied: B1.3 Date: 07/19/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration September 24, 2013 CX-011171: Categorical Exclusion Determination Longview and Tillamook Substation Communication Upgrades CX(s) Applied: B1.7 Date: 09/24/2013

420

Washington's 5th congressional district: Energy Resources | Open Energy  

Open Energy Info (EERE)

Contents Contents 1 US Recovery Act Smart Grid Projects in Washington's 5th congressional district 2 Registered Research Institutions in Washington's 5th congressional district 3 Registered Energy Companies in Washington's 5th congressional district 4 Energy Generation Facilities in Washington's 5th congressional district 5 Utility Companies in Washington's 5th congressional district US Recovery Act Smart Grid Projects in Washington's 5th congressional district Avista Utilities Smart Grid Project Registered Research Institutions in Washington's 5th congressional district Washington State University Registered Energy Companies in Washington's 5th congressional district Itron ReliOn Energy Generation Facilities in Washington's 5th congressional district Kettle Falls Biomass Facility

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Washington,  

Broader source: Energy.gov (indexed) [DOE]

DC 20585 December 20, 2005 MEMORANDUM FOR THE ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION CHIEF FINANCIAL OFFICER DIRECTOR, OFFICE OF MANAGEMENT FROM: William S. Maharay Deputy Inspector General for Audit Services Office of Inspector General SUBJECT: Audit Report on "Federal Managers' Financial Integrity Act" Audit Report No.: OAS-L-06-04 We reviewed selected aspects of the Department.of Energy's (Department) implementation of the Federal Managers' Financial Integrity Act (FMFIA) of 1982. FMFIA requires that agencies establish management control and financial systems to provide reasonable assurance that the integrity of Federal programs and operations is protected. Furthermore, it requires that the head of the agency provide an annual assurance statement on whether the agency has met this

422

Washington  

Broader source: Energy.gov (indexed) [DOE]

December 5, 2011 December 5, 2011 MEMORANDUM FOR SECRETARIAL OFFICERS AND HEADS OF FIELD ORGANIZATIONS FROM: SUBJECT: !~::o~~~ral Cou;;(} '/-- Reminder Regarding Annual National Environmental Policy Act (NEP A) Planning Summaries Early involvement by senior management in the NEP A planning process is a key component of a successful NEP A compliance program. Thus, Department of Energy (DOE) Order 451.1 B requires that each Secretarial Officer and Head of a Field Organization submit an annual NEP A planning summary to the General Counsel by January 31 of each year and make it available to the public. Preparation of these summaries helps ensure that NEP A activities are aligned with program priorities and that resources are allocated to enable timely completion ofNEPA

423

Publications: 1. N.V. Avramenko, A.L. Mirakyan, M.V. Korobov, E.B. Stukalin, Thermochemistry of  

E-Print Network [OSTI]

, E.B. Stukalin, N.I. Ivanova, N.V. Avramenko, G.V. Andrievsky, DSC study of C60 ­ water system, A.B. Kolomeisky. Coupling of two motor proteins: a new motor can move faster, Phys. Rev. Lett., 94

424

Washington State solar loan assistance  

SciTech Connect (OSTI)

Qualifying citizens of Washington State can receive passive solar investment subsidies funded by the Department of Housing and Urban Development (HUD) if their design is certified by a licensed engineer or architect. The pilot program operates through 25 credit unions. It is intended to promote energy conservation and to stimulate construction and small-business employment. Requirements for the space heating system are an area for solar collection, an absorber, storage mass, a method of heat distribution, and a device to regulate heat. The design can be either for new construction or as a retrofit.

Kinnear, N.; James, J.

1984-07-01T23:59:59.000Z

425

Categorical Exclusion Determinations: Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

December 14, 2012 December 14, 2012 CX-009689: Categorical Exclusion Determination Washington River Protection Solutions LLC - Disconnection of Utilities CX(s) Applied: B1.27 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012 CX-009672: Categorical Exclusion Determination Washington River Protection Solutions LLC - Relocation of Buildings CX(s) Applied: B1.22 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012 CX-009671: Categorical Exclusion Determination Washington River Protection Solutions LLC - Demolition and Disposal of Buildings CX(s) Applied: B1.23 Date: 12/14/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office December 14, 2012

426

Washington/Geothermal | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Washington/Geothermal < Washington Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Print PDF Washington Geothermal General Regulatory Roadmap Geothermal Power Projects Under Development in Washington No geothermal projects listed. Add a geothermal project. Operational Geothermal Power Plants in Washington No geothermal power plants listed. Add a geothermal energy generation facility. Geothermal Areas in Washington Mean Capacity (MW) Number of Plants Owners Geothermal Region Baker Hot Spring Geothermal Area 22.7 MW22,700 kW 22,700,000 W 22,700,000,000 mW 0.0227 GW 2.27e-5 TW Cascades Geothermal Region

427

PacifiCorp (Washington) | Open Energy Information  

Open Energy Info (EERE)

Washington) Washington) (Redirected from Pacific Power (Washington)) Jump to: navigation, search Name PacifiCorp Place Washington Service Territory Washington Website www.pacificorp.com/index. Green Button Reference Page www.pacificpower.net/abou Green Button Implemented Yes Utility Id 14354 References Energy Information Administration.[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. PacifiCorp consists of three business units. Pacific Power is a subsidiary of PacifiCorp which delivers electricity to customers in Oregon, Washington and California; it is headquartered in Portland, OR. Utility Rate Schedules Grid-background.png No rate schedules available. Average Rates Residential: $0.0723/kWh

428

Recipient: County of Washington, Oregon ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM  

Broader source: Energy.gov (indexed) [DOE]

25 25 Recipient: County of Washington, Oregon ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANTS NEPA COMPLIANCE FORM Activities Determination/ Categorical Exclusion Reviewer's Specific Instructions and Rationale (Restrictions and Allowable Activity) Wa. Co. EE&C Project for County Facilities and Land Use and Transportation Development A9 B5.1 Waste stream Clause Historical Preservation Clause Engineering Clause (Installation of rooftop PV systems onto county government buildings) Energy Efficiency Retrofits B2.5 B5.1 Waste Stream Clause Historical Preservation Clause (EE retrofits and lighting replacements) Energy Efficiency and Conservation Development Project - Transportation A9 All CX applies to administration, planning, siting and developing of a bike, trail and pedestrian system.

429

DOI-BLM-NV-C010-2012-0073-DNA | Open Energy Information  

Open Energy Info (EERE)

2-0073-DNA 2-0073-DNA DNA at Tungsten Mountain Geothermal Area for Geothermal/Well Field Ormat Nevada Inc. Geothermal Drilling Permit 24-23 General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Ormat Technologies Inc Geothermal Area Tungsten Mountain Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Observation Wells Comments Geothermal Drilling Permit 24-23 Observation Well Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Decision Document Date 9/26/2012 Relevant Numbers Lead Agency Doc Number DOI-BLM-NV-C010-2012-0073-DNA

430

DOI-BLM-NV-C010-2012-0005-DNA | Open Energy Information  

Open Energy Info (EERE)

05-DNA 05-DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0005-DNA DNA at McCoy Geothermal Area for Geothermal/Well Field {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Magma Energy Geothermal Area McCoy Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Observation Wells Comments GDP Well # 62-8 and 17-20 Time Frame (days) Application Time 1 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 2011/10/18

431

DOI-BLM-NV-B020-2012-0214-EA | Open Energy Information  

Open Energy Info (EERE)

2-0214-EA 2-0214-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-B020-2012-0214-EA EA at Silver Peak Geothermal Area for Geothermal/Exploration Silver Peak Area Geothermal Exploration Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Rockwood Lithium Inc Consultant Environmental Management Associates, Inc. Geothermal Area Silver Peak Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Drilling Techniques, Well Testing Techniques Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Battle Mountain Managing Field Office BLM Tonopah Field Office Funding Agencies none provided

432

GRR/Section 4-NV-b - Temporary Use of Ground Water for Exploration | Open  

Open Energy Info (EERE)

b - Temporary Use of Ground Water for Exploration b - Temporary Use of Ground Water for Exploration < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-NV-b - Temporary Use of Ground Water for Exploration 04NVBTemporaryUseOfGroundWaterForExploration.pdf Click to View Fullscreen Contact Agencies Nevada Division of Water Resources Regulations & Policies NAC 534.444 Waiver to use water to explore for oil, gas or geothermal resources Triggers None specified Click "Edit With Form" above to add content 04NVBTemporaryUseOfGroundWaterForExploration.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Nevada Division of Water Resources (NDWR) may grant a waiver of the

433

DOI-BLM-NV-W010-2010-0004-EA | Open Energy Information  

Open Energy Info (EERE)

-EA -EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W010-2010-0004-EA EA at New York Canyon Geothermal Area for Geothermal/Exploration New York Canyon Geothermal Exploration Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Terra-Gen Power LLC Consultant CH2M Hill Ltd Geothermal Area New York Canyon Geothermal Area Project Location Lovelock, Nevada Project Phase Geothermal/Exploration Techniques Exploration Drilling, Well Testing Techniques Time Frame (days) Application Time 326 NEPA Process Time 354 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office Humboldt River Funding Agencies none provided

434

DOI-BLM-NV-C010-2012-0028-DNA | Open Energy Information  

Open Energy Info (EERE)

C010-2012-0028-DNA C010-2012-0028-DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0028-DNA DNA at Dead Horse Wells Geothermal Area for Geothermal/Well Field {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Ormat Technologies Inc Geothermal Area Dead Horse Wells Geothermal Area Project Location California Project Phase Geothermal/Well Field Techniques Flow Test, Injectivity Test Comments Sundry Notice: Flow Test Well 85-11 and simultaneously Inject Test Well 68-1 and 24A-6 Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided

435

DOI-BLM-NV-C010-2012-0020-DNA | Open Energy Information  

Open Energy Info (EERE)

-DNA -DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0020-DNA DNA at Salt Wells Geothermal Area for Geothermal/Well Field {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Ormat Technologies Inc Geothermal Area Salt Wells Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Observation Wells Comments Geothermal Drilling Permit 11A-32 Observation Well Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Decision Document Date 1/27/2012

436

NV Energy (Northern Nevada) - SureBet Business Energy Efficiency Rebate  

Broader source: Energy.gov (indexed) [DOE]

Northern Nevada) - SureBet Business Energy Efficiency Northern Nevada) - SureBet Business Energy Efficiency Rebate Program NV Energy (Northern Nevada) - SureBet Business Energy Efficiency Rebate Program < Back Eligibility Agricultural Commercial Construction Fed. Government Industrial Installer/Contractor Institutional Local Government Nonprofit Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heating Appliances & Electronics Commercial Lighting Lighting Manufacturing Windows, Doors, & Skylights Program Info State Nevada Program Type Utility Rebate Program Rebate Amount '''Existing Facilities''' T-8 Lamps: $2 - $7/lamp New T8/T5 Fixture: $0.30/watt reduced T-8/T-5 High Bay Replacement for HID: $0.30/watt reduced

437

DOI-BLM-NV-C010-2011-0514-EA | Open Energy Information  

Open Energy Info (EERE)

-EA -EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2011-0514-EA EA at McCoy Geothermal Area for Geothermal/Well Field McCoy II Geothermal Exploration Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Magma Energy Geothermal Area McCoy Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Time Frame (days) NEPA Process Time 560 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Document Type ROW Scoping Initiated Date 2010/04/06

438

DOI-BLM-NV-W010-2011-0001-EA | Open Energy Information  

Open Energy Info (EERE)

10-2011-0001-EA 10-2011-0001-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W010-2011-0001-EA EA at Grass Valley Geothermal Area for Geothermal/Exploration, Geothermal/Well Field Leach Hot Springs Geothermal Exploration Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Ormat Technologies Inc Consultant JBR Environmental Consultants, Inc. Geothermal Area Grass Valley Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration, Geothermal/Well Field Techniques Development Drilling, Exploration Drilling, Well Testing Techniques Time Frame (days) Application Time 345 NEPA Process Time 274 Participating Agencies Lead Agency BLM Funding Agency none provided

439

DOI-BLM-NV-C010-2011-0527-CX | Open Energy Information  

Open Energy Info (EERE)

27-CX 27-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2011-0527-CX CX at Dixie Valley Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant AltaRock Energy Inc Geothermal Area Dixie Valley Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Passive Seismic Techniques Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Decision Document Date 6/6/2011 Relevant Numbers Lead Agency

440

DOI-BLM-NV-W030-2012-0020-CX | Open Energy Information  

Open Energy Info (EERE)

20-CX 20-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W030-2012-0020-CX CX at Pinto Hot Springs Geothermal Area for Geothermal/Exploration, Pinto Hot Springs Geothermal Gradient Well Drilling General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Nevada Bureau of Mines and Geology Geothermal Area Pinto Hot Springs Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Thermal Gradient Holes Time Frame (days) Application Time 128 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office BLM Black Rock Field Office Funding Agencies none provided Surface Manager none provided

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

DOI-BLM-NV-B020-2011-0017-CX | Open Energy Information  

Open Energy Info (EERE)

1-0017-CX 1-0017-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-B020-2011-0017-CX CX at Silver Peak Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant CHB Metal Foote Corporation Geothermal Area Silver Peak Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 49 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Battle Mountain Managing Field Office BLM Tonopah Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 10/22/2010 Decision Document Date 12/10/2010

442

DOI-BLM-NV-W010-2012-0005-EA | Open Energy Information  

Open Energy Info (EERE)

2-0005-EA 2-0005-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W010-2012-0005-EA EA at New York Canyon Geothermal Area for Geothermal/Power Plant, Geothermal/Transmission, Geothermal/Well Field New York Canyon Geothermal Utilization and Interconnect Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Terra-Gen Power LLC Consultant EMPSi Geothermal Area New York Canyon Geothermal Area Project Location Lovelock, Nevada Project Phase Geothermal/Power Plant, Geothermal/Transmission, Geothermal/Well Field Techniques Development Drilling, Downhole Techniques Time Frame (days) Application Time 735 NEPA Process Time 509 Participating Agencies Lead Agency BLM

443

DOI-BLM-NV-C010-2010-0008-EA | Open Energy Information  

Open Energy Info (EERE)

C010-2010-0008-EA C010-2010-0008-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2010-0008-EA EA at Soda Lake Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Magma Energy Consultant JBR Environmental Consultants, Inc. Geothermal Area Soda Lake Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Downhole Techniques, Drilling Techniques, Exploration Drilling, Well Testing Techniques Time Frame (days) Application Time 292 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided

444

DOI-BLM-NV-C010-2010-0008-CX | Open Energy Information  

Open Energy Info (EERE)

0-0008-CX 0-0008-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2010-0008-CX CX at Dixie Meadows Geothermal Area for Geothermal/Exploration Dixie Meadows Seismic Survey General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Terra-Gen Power LLC Geothermal Area Dixie Meadows Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Electromagnetic Techniques Time Frame (days) Application Time 209 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 6/30/2009

445

DOI-BLM-NV-C010-2013-0007-DNA | Open Energy Information  

Open Energy Info (EERE)

07-DNA 07-DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2013-0007-DNA DNA at Dead Horse Wells Geothermal Area for Geothermal/Well Field {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Ormat Technologies Inc Geothermal Area Dead Horse Wells Geothermal Area Project Location California Project Phase Geothermal/Well Field Techniques Observation Wells Comments Geothermal Drilling Permit Well 38-12 Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates

446

DOI-BLM-NV-W010-2012-0057-EA | Open Energy Information  

Open Energy Info (EERE)

57-EA 57-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W010-2012-0057-EA EA at Brady Hot Springs Geothermal Area for Geothermal/Well Field Brady Hot Springs Well 15-12 Hydro-Stimulation General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Brady Power Partners Geothermal Area Brady Hot Springs Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Downhole Techniques Time Frame (days) Application Time 378 Participating Agencies Lead Agency BLM Funding Agency DOE Managing District Office Winnemucca Managing Field Office Humboldt River Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 1/5/2012

447

DOE/NV-441 Nevada Environmental Restoration Project Rulison Drilling Effluent  

Office of Legacy Management (LM)

Ru\-- 7-2-4@ Ru\-- 7-2-4@ DOE/NV-441 Nevada Environmental Restoration Project Rulison Drilling Effluent Pond Site Long-Term Groundwater Monitoring Plan July 1996 Environmental Restoration U.S. Department of Energy This report has been reproduced from the best available copy. Available in paper copy and microfiche. Number of pages in this report: 5 1 DOE and DOE contractors cari obtain copies of this report from: Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 3783 1. (61 5) 576-8401. This report is publicly available from the Department of Commerce, National Technical Information Service, 5285 Port Royal Road, Springfield, VA 22 16 1. (703) 487-4650. RULISON DRILLING EFFLUENT POND SITE LONG-TERM GROUNDWATER MONITORING PLAN DOE Nevada Operations Office

448

DOI-BLM-NV-C010-2012-0048-DNA | Open Energy Information  

Open Energy Info (EERE)

48-DNA 48-DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0048-DNA DNA at Salt Wells Geothermal Area for Geothermal/Well Field, Enell Salt Wells LLC Geothermal Drilling Permits 44-35, 61-2, 68-35, and 16-36 General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Enel Salt Wells LLC Geothermal Area Salt Wells Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Observation Wells Comments Geothermal Drilling Permits 44-35, 61-2, 68-35, and 16-36 Observation Wells Time Frame (days) Participating Agencies Lead Agency Nevada Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater

449

DOI-BLM-NV-W010-2010-0040-CX | Open Energy Information  

Open Energy Info (EERE)

W010-2010-0040-CX W010-2010-0040-CX CX at {{{GeothermalArea}}} for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Presco Energy LLC Geothermal Area {{{GeothermalArea}}}"{{{GeothermalArea}}}" cannot be used as a page name in this wiki. Project Location Project Phase Geothermal/Exploration Techniques Reflection Survey Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office Humboldt River Funding Agencies none provided Surface Manager BLM, BOR Mineral Manager BLM, BOR Selected Dates Application Date 1/25/2010 Relevant Numbers Lead Agency Doc Number DOI-BLM-NV-W030-2010-???-CX Serial Number NVN-088196

450

DOI-BLM-NV-0063-EA06-100 | Open Energy Information  

Open Energy Info (EERE)

0063-EA06-100 0063-EA06-100 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-0063-EA06-100 EA at {{{GeothermalArea}}} for Geothermal/Exploration Jersey Valley Geothermal Exploration Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Ormat Technologies Inc Geothermal Area {{{GeothermalArea}}}"{{{GeothermalArea}}}" cannot be used as a page name in this wiki. Project Location Project Phase Geothermal/Exploration Techniques Drilling Techniques, Well Testing Techniques Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office Humboldt River Funding Agencies none provided

451

DOI-BLM-NV-C010-2012-0050-EA | Open Energy Information  

Open Energy Info (EERE)

EA EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0050-EA EA at Dead Horse Wells Geothermal Area for Geothermal/Well Field, Geothermal/Power Plant Wild Rose Geothermal Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Ormat Technologies Inc Consultant EMPSi Geothermal Area Dead Horse Wells Geothermal Area Project Location California Project Phase Geothermal/Well Field, Geothermal/Power Plant Techniques Development Drilling, Drilling Techniques Time Frame (days) Application Time 245 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided

452

DOI-BLM-NV-CO10-2011-0501-EA | Open Energy Information  

Open Energy Info (EERE)

CO10-2011-0501-EA CO10-2011-0501-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-CO10-2011-0501-EA EA at Patua Geothermal Area for Geothermal/Well Field Gradient Resources, Inc. Patua Geothermal Project Phase II General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Gradient Resources Geothermal Area Patua Geothermal Area Project Location Fernley, Nevada Project Phase Geothermal/Well Field Techniques Production Wells, Thermal Gradient Holes Time Frame (days) NEPA Process Time 85 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM, BOR

453

DOI-BLM-NV-E030-2011-0017-CX | Open Energy Information  

Open Energy Info (EERE)

E030-2011-0017-CX E030-2011-0017-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-E030-2011-0017-CX CX at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant USGS Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 134 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office BLM Elko District Office Managing Field Office none provided Funding Agencies none provided Surface Manager BLM Mineral Manager none provided Selected Dates Application Date 2/24/2011

454

DOI-BLM-NV-B020-2010-????-CX | Open Energy Information  

Open Energy Info (EERE)

10-????-CX 10-????-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-B020-2010-????-CX CX at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Ormat Technologies Inc Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Thermal Gradient Holes Time Frame (days) Application Time 36 Participating Agencies Lead Agency BLM Funding Agency DOE Managing District Office Battle Mountain Managing Field Office BLM Mount Lewis Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 12/20/2010

455

GRR/Section 18-NV-a - Underground Storage Tank | Open Energy Information  

Open Energy Info (EERE)

a - Underground Storage Tank a - Underground Storage Tank < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-NV-a - Underground Storage Tank 18NVAUndergroundStorageTank.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) Triggers None specified Click "Edit With Form" above to add content 18NVAUndergroundStorageTank.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Nevada Division of Environmental Protection (NDEP) administers the Underground Storage Tank (UST) Program for the State of Nevada.

456

DOI-BLM-NV-C010-2011-0004-CX | Open Energy Information  

Open Energy Info (EERE)

CX CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2011-0004-CX CX at Dixie Valley Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant AltaRock Energy Inc Geothermal Area Dixie Valley Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Seismic Techniques Time Frame (days) Application Time 77 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager none provided Selected Dates Application Date 11/4/2010 Decision Document Date 1/20/2011

457

DOI-BLM-NV-C010-2012-0057-CX | Open Energy Information  

Open Energy Info (EERE)

CX CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0057-CX CX at Dixie Meadows Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Ormat Technologies Inc Geothermal Area Dixie Meadows Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Thermal Gradient Holes Time Frame (days) Application Time 25 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 5/24/2012 Decision Document Date 6/18/2012

458

DOI-BLM-NV-C010-2011-0015-CX | Open Energy Information  

Open Energy Info (EERE)

5-CX 5-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2011-0015-CX CX at Patua Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Gradient Resources Geothermal Area Patua Geothermal Area Project Location Fernley, Nevada Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 23 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BOR Mineral Manager none provided Selected Dates Application Date 1/18/2011 Decision Document Date 2/10/2011

459

DOI-BLM-NV-C010-2012-0019-DNA | Open Energy Information  

Open Energy Info (EERE)

-DNA -DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012-0019-DNA DNA at Salt Wells Geothermal Area for Geothermal/Well Field {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Ormat Technologies Inc Geothermal Area Salt Wells Geothermal Area Project Location Nevada Project Phase Geothermal/Well Field Techniques Observation Wells Comments GDP Well 18-5 Observation Well Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Document Type GPD

460

DOI-BLM-NV-063-EA08-091 | Open Energy Information  

Open Energy Info (EERE)

-EA08-091 -EA08-091 Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-063-EA08-091 EA at Buffalo Valley Hot Springs Geothermal Area for Geothermal/Power Plant Jersey Valley and Buffalo Valley Geothermal Development Projects General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Ormat Technologies Inc Consultant Environmental Management Associates; Great Basin Ecology; Cogstone Resource Management; Kautz Environmental Consultants Geothermal Area Buffalo Valley Hot Springs Geothermal Area Project Location Nevada Project Phase Geothermal/Power Plant Techniques Production Wells Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Battle Mountain

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

DOI-BLM-NV-CO1000-2010-0009-CX | Open Energy Information  

Open Energy Info (EERE)

10-0009-CX 10-0009-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-CO1000-2010-0009-CX CX at Dixie Meadows Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Terra-Gen Power LLC Geothermal Area Dixie Meadows Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Electromagnetic Techniques Time Frame (days) Application Time 209 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 6/30/2009

462

DOI-BLM-NV-C010-2013-0023-DNA | Open Energy Information  

Open Energy Info (EERE)

3-0023-DNA 3-0023-DNA DNA at Dead Horse Wells Geothermal Area for Geothermal/Well Field {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Ormat Technologies Inc Geothermal Area Dead Horse Wells Geothermal Area Project Location California Project Phase Geothermal/Well Field Techniques Observation Wells Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Document Type GPD Decision Document Date 1/31/2013 Relevant Numbers Lead Agency Doc Number DOI-BLM-NV-C010-2013-0023-DNA Serial Number NVN-083929 Lease Numbers

463

DOI-BLM-NV-C010-2012--044-DNA | Open Energy Information  

Open Energy Info (EERE)

-044-DNA -044-DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2012--044-DNA DNA at {{{GeothermalArea}}} for Geothermal/Power Plant, Ormatt Nevada Sundry Notice -Geotechnical Work General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Ormatt Nevada, Inc Geothermal Area {{{GeothermalArea}}}"{{{GeothermalArea}}}" cannot be used as a page name in this wiki. Project Location Project Phase Geothermal/Power Plant Techniques Drilling Methods Comments Sundry Notice to drill 3 boreholes to evaluate engineering characteristics of potential power plant location Time Frame (days) Participating Agencies Lead Agency Nevada Funding Agency none provided Managing District Office Carson City

464

DOI-BLM-NV-W010-2010-0041-CX | Open Energy Information  

Open Energy Info (EERE)

W010-2010-0041-CX W010-2010-0041-CX CX at Brady Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Stephen D. Muir Geothermal Area Brady Hot Springs Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Seismic Techniques Time Frame (days) Application Time 115 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office Humboldt River Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 4/2/2010 Application Document Type POO Decision Document Date 7/26/2010 Relevant Numbers Lead Agency Doc Number DOI-BLM-NV-W010-2010-0041-CX

465

GRR/Section 18-NV-b - State RCRA Process | Open Energy Information  

Open Energy Info (EERE)

b - State RCRA Process b - State RCRA Process < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 18-NV-b - State RCRA Process 18NVBStateRCRAProcess.pdf Click to View Fullscreen Contact Agencies Nevada Division of Environmental Protection Regulations & Policies Nevada Revised Statutes (NRS) Nevada Administrative Code (NAC) Triggers None specified Click "Edit With Form" above to add content 18NVBStateRCRAProcess.pdf 18NVBStateRCRAProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Within the Nevada Division of Environmental Protection in Nevada, the Bureau of Waste Management (BWM) operates a permitting and compliance

466

DOI-BLM-NV-C010-2013-0022-DNA | Open Energy Information  

Open Energy Info (EERE)

22-DNA 22-DNA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2013-0022-DNA DNA at Dixie Meadows Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type DNA Applicant Ormat Technologies Inc Geothermal Area Dixie Meadows Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Thermal Gradient Holes Comments Core hole/TGH Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Document Type NOI

467

GRR/Section 4-NV-c - Monitoring Well Waiver | Open Energy Information  

Open Energy Info (EERE)

c - Monitoring Well Waiver c - Monitoring Well Waiver < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 4-NV-c - Monitoring Well Waiver 04NVCMonitoringWellWaiver (1).pdf Click to View Fullscreen Contact Agencies Nevada Division of Water Resources Regulations & Policies NAC 534.148 Monitoring Well defined NAC 534.441 Waiver to drill monitoring well Triggers None specified Click "Edit With Form" above to add content 04NVCMonitoringWellWaiver (1).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The Nevada Division of Water Resources (NDWR) may grant a waiver of the general drilling requirements for good cause shown. One common form of

468

DOI-BLM-NV-W010-2009-0018-CX | Open Energy Information  

Open Energy Info (EERE)

-0018-CX -0018-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W010-2009-0018-CX CX at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Gradient Resources Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Geophysical Methods Time Frame (days) Application Time 7 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office Humboldt River Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 2/19/2009

469

DOI-BLM-NV-C010-2011-0504-CX | Open Energy Information  

Open Energy Info (EERE)

04-CX 04-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2011-0504-CX CX at Patua Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Gradient Resources Geothermal Area Patua Geothermal Area Project Location Fernley, Nevada Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 32 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City, Winnemucca Managing Field Office none provided Funding Agencies none provided Surface Manager BOR Mineral Manager none provided Selected Dates Application Date 4/22/2011 Decision Document Date 5/24/2011

470

DOI-BLM-NV-E030-20??-????-?? | Open Energy Information  

Open Energy Info (EERE)

0-20??-????-?? 0-20??-????-?? Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-E030-20??-????-?? EA at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Standard Steam Trust LLC Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Time Frame (days) Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office BLM Elko District Office Managing Field Office none provided Funding Agencies none provided Surface Manager none provided Mineral Manager none provided Selected Dates Relevant Numbers Lead Agency

471

DOI-BLM-NV-C010-2011-0014-CX | Open Energy Information  

Open Energy Info (EERE)

4-CX 4-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2011-0014-CX CX at Patua Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Gradient Resources Geothermal Area Patua Geothermal Area Project Location Fernley, Nevada Project Phase Geothermal/Exploration Techniques Reflection Survey Time Frame (days) Application Time 8 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BOR Mineral Manager none provided Selected Dates Application Date 1/5/2011 Decision Document Date 1/13/2011

472

DOI-BLM-NV-C010-2011-0019-CX | Open Energy Information  

Open Energy Info (EERE)

9-CX 9-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-C010-2011-0019-CX CX at Gabbs Valley Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Geoglobal US Gabbs LLC Geothermal Area Gabbs Valley Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Time Frame (days) Application Time 0 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Carson City Managing Field Office Stillwater Funding Agencies none provided Surface Manager BLM Mineral Manager none provided Selected Dates Application Date 2/17/2011 Decision Document Date 2/17/2011

473

DOI-BLM-NV-B010-2011-0015-EA | Open Energy Information  

Open Energy Info (EERE)

-2011-0015-EA -2011-0015-EA Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-B010-2011-0015-EA EA at McGuiness Hills Geothermal Area for Geothermal/Power Plant McGinness Hills Geothermal Development Project General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type EA Applicant Ormat Technologies Inc Consultant Great Basin Ecology, Inc.; JBR Environmental Consultants; NAVCON; WCRM, Inc. Geothermal Area McGuiness Hills Geothermal Area Project Location Nevada Project Phase Geothermal/Power Plant Techniques Drilling Techniques, Production Wells, Well Testing Techniques Comments McGinnis Hills Geothermal Area, not on Master list of geothermal areas - no adjacent areas are appropriate. Time Frame (days)

474

DOI-BLM-NV-W030-2010-0021-CX | Open Energy Information  

Open Energy Info (EERE)

30-2010-0021-CX 30-2010-0021-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W030-2010-0021-CX CX at San Emidio Desert Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant US Geothermal Inc Geothermal Area San Emidio Desert Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Seismic Techniques Time Frame (days) Application Time 132 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office BLM Black Rock Field Office Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 4/23/2010

475

DOI-BLM-NV-W030-2011-0007-CX | Open Energy Information  

Open Energy Info (EERE)

7-CX 7-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W030-2011-0007-CX CX at San Emidio Desert Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant US Geothermal Inc Geothermal Area San Emidio Desert Geothermal Area Project Location Nevada Project Phase Geothermal/Exploration Techniques Seismic Techniques Time Frame (days) Application Time 39 Participating Agencies Lead Agency BLM Funding Agency US Department of Energy Office of Energy Efficiency and Renewable Energy (DOE EERE) Managing District Office Winnemucca Managing Field Office BLM Black Rock Field Office Funding Agencies none provided Surface Manager BLM,

476

DOI-BLM-NV-W010-2010-0039-CX | Open Energy Information  

Open Energy Info (EERE)

-0039-CX -0039-CX Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home NEPA Document Collection for: DOI-BLM-NV-W010-2010-0039-CX CX at Abraham Hot Springs Geothermal Area for Geothermal/Exploration {{{NEPA_Name}}} General NEPA Document Info Energy Sector Geothermal energy Environmental Analysis Type CX Applicant Terra-Gen Power LLC Geothermal Area Abraham Hot Springs Geothermal Area Project Location Utah Project Phase Geothermal/Exploration Techniques Micro-Earthquake Time Frame (days) Application Time 64 Participating Agencies Lead Agency BLM Funding Agency none provided Managing District Office Winnemucca Managing Field Office Humboldt River Funding Agencies none provided Surface Manager BLM Mineral Manager BLM Selected Dates Application Date 5/12/2010

477

MEMORANDUM : APPROVAL TO MODIFY ADVANCE WAIVER OF PATENT RIGHTS W(A)  

Broader source: Energy.gov (indexed) [DOE]

: APPROVAL TO MODIFY ADVANCE WAIVER OF PATENT RIGHTS W(A) : APPROVAL TO MODIFY ADVANCE WAIVER OF PATENT RIGHTS W(A) 2009-047 GRANTED FOR US SOLAR HOLDINGS LLC UNDER AGREEMENT NO. DE-FC36-08G018 155 US Solar Holdings LLC ("US Solar") has requested that the Department of Energy ("DOE") modify or clarify the cost share requirements set forth in the statement of considerations for the granted advance patent waiver W(A) 2009-047. Specifically, the statement of considerations, as originally granted, states the following: The total cost of the award is approximately $4 million with the Petitioner providing about 50% cost sharing. This waiver is contingent upon the Petitioner maintaining, in aggregate, the above cost sharing percentage over the course of the agreement. Rather than just provide an aggregate cost share requirement of 50% for the agreement, US Solar

478

FUPWG Spring 2010 Providence: Washington Update  

Broader source: Energy.gov [DOE]

Presentation covers an update on Washington and is given at the Spring 2010 Federal Utility Partnership Working Group (FUPWG) meeting in Providence, Rhode Island.

479

Washington TRU Solutions Inc | Open Energy Information  

Open Energy Info (EERE)

Solutions Inc Jump to: navigation, search Name: Washington TRU Solutions, Inc. Place: Carlsbad, New Mexico Zip: 88220 Product: New Mexico-based managing and operating contractor...

480

Bonneville Power Administration, Oregon Energy Northwest, Washington...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy Northwest, Washington; Wholesale Electric Primary Credit Analyst: David N Bodek, New York (1) 212-438-7969; david.bodek@standardandpoors.com Secondary Contact: Jeffrey M...

Note: This page contains sample records for the topic "nv washington wa" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Washington Joint Aquatic Resources Permit Application | Open...  

Open Energy Info (EERE)

Permit Application Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Permit ApplicationPermit Application: Washington Joint Aquatic...

482

USDA Rural Development Washington State Workshop  

Broader source: Energy.gov [DOE]

The U.S. Department of Agriculture is hosting a Washington Rural Development Workshop. Speakers will cover local and regional broadband initiatives program and broadband success stories,...

483

Crews repair transmission lines after Washington wildfire  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Privacy Publications Tribal Affairs Newsroom Search News Articles... Search Crews repair transmission lines after Washington wildfire 662014 12:00 AM Tweet Page Content BPA...

484

Washington: a guide to geothermal energy development  

SciTech Connect (OSTI)

Washington's geothermal potential is discussed. The following topics are covered: exploration, drilling, utilization, legal and institutional setting, and economic factors of direct use projects. (MHR)

Bloomquist, R.G.; Basescu, N.; Higbee, C.; Justus, D.; Simpson, S.

1980-06-01T23:59:59.000Z

485

Seattle, Washington: Solar in Action (Brochure)  

SciTech Connect (OSTI)

This brochure provides an overview of the challenges and successes of Seattle, WA, a 2008 Solar America City awardee, on the path toward becoming a solar-powered community. Accomplishments, case studies, key lessons learned, and local resource information are given.

Not Available

2011-10-01T23:59:59.000Z

486

Central Washington University: 2014 Engineering Technologies, Safety & Construction Fair  

Broader source: Energy.gov [DOE]

Location:400 E. University Way Ellensburg, WA 98926,SURC BallroomPOC: Heather BainWebsite:http://bit.ly/1pgOpN7

487

Itron (Washington) | Open Energy Information  

Open Energy Info (EERE)

Itron Itron Address 601 Officers Row Place Vancouver, Washington Zip 98661 Sector Efficiency Product Manufactures/sells advanced meters and data collection systems Website http://www.itron.com/ Coordinates 45.627447°, -122.656794° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.627447,"lon":-122.656794,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

488

Washington, DC~ZO585  

Office of Legacy Management (LM)

jpfl.3%2' jpfl.3%2' ) .,Departhent of Eikrgj! : Washington, DC~ZO585 .-, , , Lf; I: ~.1,' .Yj4 , The Honorable Louis Barlup 55 ,E. Main Street Waynesboro;,Pennsy,lvania 17268 '~ Dear Mayor Barl,up:' Secretary of Energy Hazel O'Leary has'announced' a new approach to openness,in the Department of Energy-(DOE) and its communications with the public. In support-of this initiative, we are pleased.to forward the enclosed information related to the former Landis Machine Tool Co. site in your jurisdiction that performed work for DOE or its predecessor agencies. This information:is provided for your information< use, and retention. DOE's Formerly Utilized Sites Remedial Action Program is responsible for identification of sites used by DOE's predecessor agencies, determining their

489

Industrial & Systems Engineering University of Washington  

E-Print Network [OSTI]

Industrial & Systems Engineering University of Washington Linda Ng Boyle, Ph.D. Associate Professor linda@u.washington.edu #12;Agenda · What is Industrial & Systems Engineering? · Where do Industrial Engineers get jobs? · What classes would you take in ISE? · Where do UW graduates with ISE degrees

Anderson, Richard

490

EIS-0119: Decommissioning of Eight Surplus Production Reactors at the Harford Site, Richland, WA  

Broader source: Energy.gov [DOE]

This EIS presents analyses of potential environmental impacts of decommissioning the eight surplus production reactors at the Hanford Site near Richland, Washington.

491

Energy Incentive Programs, Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Washington Washington Energy Incentive Programs, Washington October 29, 2013 - 1:19pm Addthis Updated January 2013 Washington utilities budgeted over $180 million in 2011 to promote increased energy efficiency in the state, excluding the offerings administered by the Northwest Energy Efficiency Alliance and Bonneville Power Authority (see below). What public-purpose-funded energy efficiency programs are available in my state? Washington has no public-purpose-funded energy efficiency programs. What utility energy efficiency programs are available to me? Seattle City Light offers a variety of energy efficiency programs to commercial and industrial customers through its Energy Smart Services initiative: Free facility energy assessments are available to medium and large commercial customers in order to manage operating costs and identify energy

492

Categorical Exclusion Determinations: Washington | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

July 15, 2013 July 15, 2013 CX-010738: Categorical Exclusion Determination 2013 Spacer and Insulator Replacement Program; Third and Fourth Quarter Projects CX(s) Applied: B1.3 Date: 07/15/2013 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration July 2, 2013 CX-010588: Categorical Exclusion Determination Chehalis Substation Tree Clearing CX(s) Applied: B1.3 Date: 07/02/2013 Location(s): Washington Offices(s): Bonneville Power Administration July 1, 2013 CX-010589: Categorical Exclusion Determination Nine Canyon Communication Tower Addition CX(s) Applied: B4.6 Date: 07/01/2013 Location(s): Washington Offices(s): Bonneville Power Administration June 25, 2013 CX-010429: Categorical Exclusion Determination Harbour Pointe Small Generator Integration

493

Washington/Transmission | Open Energy Information  

Open Energy Info (EERE)

source source History View New Pages Recent Changes All Special Pages Semantic Search/Querying Get Involved Help Apps Datasets Community Login | Sign Up Search Page Edit History Facebook icon Twitter icon » Washington/Transmission < Washington Jump to: navigation, search WashingtonTransmissionHeader.png Roadmap Agency Links Local Regulations State Regulations Summary General Transmission Dashboard Permitting Atlas Compare States Arizona California Colorado Idaho Montana Nevada New Mexico Oregon Utah Washington Wyoming Resource Library NEPA Database The electrical grid in Washington is part of the Western Interconnection power grid and the Western Electricity Coordinating Council (WECC). WECC's service territory extends from Canada to Mexico. It includes the provinces of Alberta and British Columbia, the northern portion of Baja California,

494

DOE Zero Energy Ready Home Case Study: Clifton View Homes, Whidbey Island, WA  

Broader source: Energy.gov [DOE]

Case study of a DOE Zero Energy Ready home on Whidbey Island, WA, that scores HERS 37 without PV or HERS -13 with 10 kW PV, enough to power the home and an electric car. The two-story custom home...

495

Comment on the future of the Bonneville Power Administration Jim G. Likes, Thurston County, WA  

E-Print Network [OSTI]

Comment on the future of the Bonneville Power Administration Jim G. Likes, Thurston County, WA Bonneville is a regional agency that markets federal hydropower and augments its power supply with market, everyday citizens, to pay illegally inflated power costs. Because of this, Bonneville should have the legal

496

Application of a modified denitrifying bacteria method for analyzing groundwater and vadose zone pore water nitrate at the Hanford Site, WA, USA.  

E-Print Network [OSTI]

the Hanford Site, WA, USA. Woods, Katharine N. ; Singleton,reside at DOE sites across the USA. Nitrate concentrations >

Woods, Katharine N.; Singleton, Michael J.; Conrad, Mark

2003-01-01T23:59:59.000Z

497

RECIPIENT:Nevada State Office of Energy STATE:NV PROJECT Renewable Energy and Energy Efficiency Revolving Loan Program -  

Broader source: Energy.gov (indexed) [DOE]

Nevada State Office of Energy STATE:NV Nevada State Office of Energy STATE:NV PROJECT Renewable Energy and Energy Efficiency Revolving Loan Program - Enigma Energy TITLE: Funding Opportunity Announcement Number Procurement Instrument Number NEPA Control Number cm Number DE-FOA"()000052 DE-EE-OOOOO84 GFO-0000084-012 EE84 Based on my review of the information concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4S1.1A), I have made the foUowmg determination: Cx, EA, EIS APPENDIX AND NUMBER: Description: 85.1 Actions to conserve energy, demonstrate potential energy conservation. and promote energy-efficiency that do not increase the indoor concentrations of potentially harmful substances. These actions may involve financial and technical assistance to individuals (such as builders. owners, consultants. designers). organizations (such as utilities). and state

498

Seattle, Washington: Solar in Action (Brochure), Solar America...  

Broader source: Energy.gov (indexed) [DOE]

Seattle, Washington: Solar in Action (Brochure), Solar America Cities, Energy Efficiency & Renewable Energy (EERE) Seattle, Washington: Solar in Action (Brochure), Solar America...

499

Washington Success Story-A Performance Contracting Program |...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Success Story-A Performance Contracting Program Washington Success Story-A Performance Contracting Program Provides an overview case study of Washington's Performance Contracting...

500

DOE Cites Washington Closure Hanford for Safety Violations |...  

Energy Savers [EERE]

contractor Washington Closure Hanford (WCH) for violations of DOE's worker safety and health program regulations in 2009 at the Hanford Site in southeast Washington State. In a...