Next Generation Nuclear Plant Project Evaluation of Siting a HTGR Co-generation Plant on an Operating Commercial Nuclear Power Plant Site  

Science Conference Proceedings (OSTI)

This paper summarizes an evaluation by the Idaho National Laboratory (INL) Next Generation Nuclear Plant (NGNP) Project of siting a High Temperature Gas-cooled Reactor (HTGR) plant on an existing nuclear plant site that is located in an area of significant industrial activity. This is a co-generation application in which the HTGR Plant will be supplying steam and electricity to one or more of the nearby industrial plants.

L.E. Demick

2011-10-01T23:59:59.000Z

2

Assessment of Seismic Hazard at 34 U.S. Nuclear Plant Sites  

Science Conference Proceedings (OSTI)

Interest in recent years in early site permits (ESPs) for new nuclear plants has prompted a reevaluation of seismic design criteria and a reexamination of the basis for current criteria. Currently, Regulatory Guide 1.208 bases seismic design requirements on a performance-based approach using probabilistic seismic hazard analysis (PSHA). The performance-based approach was based on PSHA results at 29 nuclear plant sites, using results that were published in 1989 and 1994. These results were supported by pr...

2008-08-27T23:59:59.000Z

3

Capturing Historical Knowledge for Decommissioning of Nuclear Power Plants: Summary of Historical Site Assessments at Eight Decommis sioning Plants  

Science Conference Proceedings (OSTI)

This report describes approaches utilized and experience gained in the development of early characterization activities by a number of nuclear power plants undergoing decommissioning. In particular, the report provides experience and lessons of performing the Historical Site Assessment, or HSA.

2004-04-01T23:59:59.000Z

4

Evolution of a Visual Impact Model to Evaluate Nuclear Plant Siting and Design Option1  

E-Print Network (OSTI)

for Analysis and Management of the Visual Resource, Incline Village, Nevada, April 23-25, 1979. 2 / AssociatesEvolution of a Visual Impact Model to Evaluate Nuclear Plant Siting and Design Option1 2/ Brian A/ The method can be used to train evaluators to use explicit criteria (vividness, intactness and unity

Standiford, Richard B.

5

Comparative analysis of United States and French nuclear power plant siting and construction regulatory policies and their economic consequences  

E-Print Network (OSTI)

Despite the substantial commitments of time and money which are devoted to the nuclear power plant siting process, the effectiveness of the system in providing a balanced evaluation of the technical, environmental and ...

Golay, Michael Warren.

1977-01-01T23:59:59.000Z

6

Supplemnental Volume - Independent Oversight Assessment of the Nuclear Safety Culture and Management of Nuclear Safety Concerns at the Hanford Site Waste Treatment and Immobilization Plant, January 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Volume Volume Independent Oversight Assessment of Nuclear Safety Culture and Management of Nuclear Safety Concerns at the Hanford Site Waste Treatment and Immobilization Plant January 2012 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Office of Health, Safety and Security HSS i Independent Oversight Assessment of Safety Culture and Management of Nuclear Safety Concerns at the Hanford Site Waste Treatment and Immobilization Plant Supplemental Volume Table of Contents Foreword ...................................................................................................................................................... iii Acronyms ...................................................................................................................................................... v

7

Concentration of Actinides in Plant Mounds at Safety Test Nuclear Sites in Nevada  

SciTech Connect

Plant mounds or blow-sand mounds are accumulations of soil particles and plant debris around large shrubs and are common features in deserts in the southwestern United States. Believed to be an important factor in their formation, the shrubs create surface roughness that causes wind-suspended particles to be deposited and resist further suspension. Shrub mounds occur in some plant communities on the Nevada Test Site, the Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR), including areas of surface soil contamination from past nuclear testing. In the 1970s as part of early studies to understand properties of actinides in the environment, the Nevada Applied Ecology Group (NAEG) examined the accumulation of isotopes of Pu, {sup 241}Am, and U in plant mounds at safety test sites. The NAEG studies found concentrations of these contaminants to be greater in shrub mounds than in the surrounding areas of desert pavement. For example, at Project 57 on the NTTR, it was estimated that 15 percent of the radionuclide inventory of the site was associated with shrub mounds, which accounted for 17 percent of the surface area of the site, a ratio of inventory to area of 0.85. At Clean Slate III at the TTR, 29 percent of the inventory was associated with approximately 32 percent of the site covered by shrub mounds, a ratio of 0.91. While the total inventory of radionuclides in intershrub areas was greater, the ratio of radionuclide inventory to area was 0.40 and 0.38, respectively, at the two sites. The comparison between the shrub mounds and adjacent desert pavement areas was made for only the top 5 cm since radionuclides at safety test sites are concentrated in the top 5 cm of intershrub areas. Not accounting for radionuclides associated with the shrub mounds would cause the inventory of contaminants and potential exposure to be underestimated. As part of its Environmental Restoration Soils Subproject, the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office has proposed that the majority of its contaminated soil 'Corrective Action Units', including the safety test sites, be closed by fencing and posting with administrative controls. The concentration of actinides in the shrub mounds has important implications for postclosure management of the safety test sites. Because resuspension factors at safety test sites can be three to four orders-of-magnitude higher than soil sites associated with atmospheric tests where criticality occurred, the shrub mounds are an important factor in stabilization of actinide contaminants. Loss of shrubs associated with mounds from fire or plant die-back from drought could cause radionuclides at these sites to become more prone to suspension and water erosion until the sites are stabilized. Alternatively, although shrub mounds are usually composed of predominantly fine sand size particles, smaller silt and clay size particles in them are often high in CaCO{sub 3} content. The CaCO{sub 3} may act as a cementing agent to limit erosion of the shrub mounds even if the vegetation cover is temporarily lost.

David S. Shafer; Jenna Gommes

2008-09-15T23:59:59.000Z

8

Bayesian Analysis for the Site-Specific Dose Modeling in Nuclear Power Plant Decommissioning.  

E-Print Network (OSTI)

??Decommissioning is the process of closing down a facility. In nuclear power plant decommissioning, it must be determined that that any remaining radioactivity at a… (more)

Ling, Xianbing

2001-01-01T23:59:59.000Z

9

Risk-Informed Evaluation of Protective Action Strategies for Nuclear Plant Off-Site Emergency Planning  

Science Conference Proceedings (OSTI)

All commercial nuclear power plants have developed formal emergency preparedness programs, which are implemented if actions required to protect public health and safety are deemed a necessary response to accident conditions. However, in the United States, the basis for these programs and the associated protective action strategies that would be implemented have not been modified since the time of the Three Mile Island accident. Based on the significant advancements in the knowledge of potential nuclear a...

2007-09-18T23:59:59.000Z

10

Trojan Nuclear Plant Decommissioning: Final Survey for the Independent Spent Fuel Storage Installation Site  

Science Conference Proceedings (OSTI)

This report describes the final radiological survey for the area where Portland General Electric (PGE) will construct the Independent Spent Fuel Storage Installation (ISFSI) at Trojan nuclear power plant. The survey fulfills the requirements for release of this area from Trojan's 10 CFR 50 license before radiation levels increase with spent fuel storage in the ISFSI.

1998-05-13T23:59:59.000Z

11

Interim Guidelines for Protecting Fire-Fighting Personnel From Multiple Hazards at Nuclear Plant Sites  

Science Conference Proceedings (OSTI)

Fire fighters and other emergency response personnel may encounter radiation, heat stress, or trauma when fighting fires in nuclear power plants. Recommendations contained in this report can be effective in reducing the impact of these hazards on fire brigade safety and performance.

1989-07-28T23:59:59.000Z

12

Idaho Site Nuclear Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Nuclear Facilities Idaho Idaho National Laboratorys (INL) Idaho Closure Project (ICP) This page was last updated on May 16...

13

Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the United States of America  

SciTech Connect

The purpose of this document is to describe approaches and methods for estimation of the design-basis flood at nuclear power plant sites. Chapter 1 defines the design-basis flood and lists the U.S. Nuclear Regulatory Commission's (NRC) regulations that require estimation of the design-basis flood. For comparison, the design-basis flood estimation methods used by other Federal agencies are also described. A brief discussion of the recommendations of the International Atomic Energy Agency for estimation of the design-basis floods in its member States is also included.

Prasad, Rajiv; Hibler, Lyle F.; Coleman, Andre M.; Ward, Duane L.

2011-11-01T23:59:59.000Z

14

Population dose commitments due to radioactive releases from nuclear power plant sites in 1986  

Science Conference Proceedings (OSTI)

Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1986. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 66 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 31 person-rem to a low of 0.0007 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 1.7 person-rem. The total population dose for all sites was estimated at 110 person-rem for the 140 million people considered at risk. The site average individual dose commitment from all pathways ranged from a low of 2 {times} 10{sup -6} mrem to a high of 0.02 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites. 12 refs.

Baker, D.A. (Pacific Northwest Lab., Richland, WA (USA))

1989-10-01T23:59:59.000Z

15

Population dose commitments due to radioactive releases from nuclear power plant sites in 1985  

Science Conference Proceedings (OSTI)

Population radiation dose commitments have been estimated from reported radionuclide releases from commericial power reactors operating during 1985. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 61 sites. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 73 person-rem to a low of 0.011 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 3 person-rem. The total population dose for all sites was estimated at 200 person-rem for the 110 million people considered at risk. The site average individual dose commitment from all pathways ranged from a low of 5 /times/ 10/sup /minus/6/ mrem to a high of 0.02 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites.

Baker, D.A.

1988-08-01T23:59:59.000Z

16

Population dose commitments due to radioactive releases from nuclear power plant sites in 1984  

Science Conference Proceedings (OSTI)

Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1984. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 56 sites. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 110 person-rem to a low of 0.002 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 5 person-rem. The total population dose for all sites was estimated at 280 person-rem for the 100 million people considered at risk. The site average individual dose commitment from all pathways ranged from a low of 6 x 10/sup -6/ mrem to a high of 0.04 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites.

Baker, D.A.

1988-01-01T23:59:59.000Z

17

Population dose commitments due to radioactive releases from nuclear power plant sites in 1982. Volume 4  

Science Conference Proceedings (OSTI)

Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1982. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 51 sites. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each site is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments from both liquid and airborne pathways ranged from a high of 30 person-rem to a low of 0.007 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 3 person-rem. The total population dose for all sites was estimated at 130 person-rem for the 100 million people considered at risk. The average individual dose commitment from all pathways on a site basis ranged from a low of 6 x 10/sup -7/ mrem to a high of 0.06 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites.

Baker, D.A.; Peloquin, R.A.

1986-06-01T23:59:59.000Z

18

Site Selection & Characterization Status Report for Next Generation Nuclear Plant (NGNP)  

SciTech Connect

In the near future, the US Department of Energy (DOE) will need to make important decisions regarding design and construction of the Next Generation Nuclear Plant (NGNP). One part of making these decisions is considering the potential environmental impacts that this facility may have, if constructed here at the Idaho National Laboratory (INL). The National Environmental Policy Act (NEPA) of 1969 provides DOE decision makers with a process to systematically consider potential environmental consequences of agency decisions. In addition, the Energy Policy Act of 2005 (Title VI, Subtitel C, Section 644) states that the 'Nuclear Regulatory Commission (NRC) shall have licensing and regulatory authority for any reactor authorized under this subtitle.' This stipulates that the NRC will license the NGNP for operation. The NRC NEPA Regulations (10 CFR Part 51) require tha thte NRC prepare an Environmental Impact Statement (EIS) for a permit to construct a nuclear power plant. The applicant is required to submit an Environmental report (ER) to aid the NRC in complying with NEPA.

Mark Holbrook

2007-09-01T23:59:59.000Z

19

Population dose commitments due to radioactive releases from nuclear power plant sites in 1988. Volume 10  

Science Conference Proceedings (OSTI)

Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1988. Fifty-year commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 71 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 16 person-rem to a low of 0.0011 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 1.1 person-rem. The total population dose for all sites was estimated at 75 person-rem for the 150 million people considered at risk. The site average individual dose commitment from all pathways ranged from a low of 3 {times} 10{sup {minus}7} mrem to a high of 0.02 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites. However, licensee calculation of doses to the maximally exposed individual at some sites indicated values of up to approximately 100 times average individual doses (on the order of a few millirem per year).

Baker, D.A. [Pacific Northwest Lab., Richland, WA (United States)

1992-01-01T23:59:59.000Z

20

Population dose commitments due to radioactive releases from nuclear power plant sites in 1988  

Science Conference Proceedings (OSTI)

Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1988. Fifty-year commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 71 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 16 person-rem to a low of 0.0011 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 1.1 person-rem. The total population dose for all sites was estimated at 75 person-rem for the 150 million people considered at risk. The site average individual dose commitment from all pathways ranged from a low of 3 {times} 10{sup {minus}7} mrem to a high of 0.02 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites. However, licensee calculation of doses to the maximally exposed individual at some sites indicated values of up to approximately 100 times average individual doses (on the order of a few millirem per year).

Baker, D.A. (Pacific Northwest Lab., Richland, WA (United States))

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Population dose commitments due to radioactive releases from nuclear power plant sites in 1983  

Science Conference Proceedings (OSTI)

Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1983. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 52 sites. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 45 person-rem to a low of 0.002 person-rem for the sites with plants operating throughout the year with an arithmetic mean of 3 person-rem. The total population dose for all sites was estimated at 170 person-rem for the 100 million people considered at risk.

Baker, D.A.; Peloquin, R.A.

1987-04-01T23:59:59.000Z

22

Dose commitments due to radioactive releases from nuclear power plant sites in 1989  

Science Conference Proceedings (OSTI)

Population and individual radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1989. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 72 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for each of the sites is an estimate of individual doses which are compared with 10 CFR Part 50, Appendix I design objectives. The total collective dose commitments (from both liquid and airborne pathways) for each site ranged from a high of 14 person-rem to a low of 0.005 person-rem for the sites with plants in operation and producing power during the year. The arithmetic mean was 1.2 person-rem. The total population dose for all sites was estimated at 84 person-rem for the 140 million people considered at risk. The individual dose commitments estimated for all sites were below the Appendix I design objectives.

Baker, D.A. (Pacific Northwest Lab., Richland, WA (United States))

1993-02-01T23:59:59.000Z

23

Study of Potential Sites for the Deployment of New Nuclear Power Plants  

E-Print Network (OSTI)

in the United States The work reflected in this document represents Dominion’s and Bechtel's best judgment as recognized companies familiar with the engineering, construction, and operation of nuclear power plants. Nevertheless, since the work has been based on preliminary design information only, evaluations contained in this document should be considered preliminary in nature, and are not intended to be the basis of final financial and other management decisions. The information on which these evaluations have been based was provided to Dominion and Bechtel by DOE and third parties, and, except where specifically stated otherwise, has not been independently verified. Accordingly, neither Dominion, Bechtel, nor anyone acting on their behalf makes any warranty, express or implied, as to the accuracy or completeness of the information or conclusions contained in this document or assumes any liability for damages resulting from the use of or reliance on such information or conclusions.

Bechtel Power Corporation; North Anna; Bechtel Power Corporation

2002-01-01T23:59:59.000Z

24

Use of fuel cells for improving on-site emergency power availability and reliability ad nuclear power plants  

E-Print Network (OSTI)

To assure safe shutdown of a nuclear power plant, there must always be reliable means of decay heat removal provided, in last resort, by an Emergency Core Cooling System (ECCS). Currently the majority of nuclear power ...

Akkaynak, Derya

2005-01-01T23:59:59.000Z

25

NUCLEAR PLANT OPERATIONS AND  

E-Print Network (OSTI)

reactor Unit 4 of the Ringhals Nuclear Power Plant (Sweden) during fuel cycle 16 is analyzed--has been benchmarked against measurements.30 At the Ringhals nuclear power plant, this measurement is car a measurement performed at the PWR Unit 4 of the Ring hals Nuclear Power Plant was available to us

Demazière, Christophe

26

NUCLEAR PLANT OPERATIONS AND  

E-Print Network (OSTI)

reactor Unit 4 of the Ringhals Nuclear Power Plant (Sweden) during fuel cycle 16 is analyzed reactivity effects--has been benchmarked against measurements.30 At the Ringhals nuclear power plant a measurement performed at the PWR Unit 4 of the Ring- hals Nuclear Power Plant was available to us

Demazière, Christophe

27

Site Map - Pantex Plant  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map Site Map Site Map Page Content Pantex.com Mission & Strategies Mission National Security Nuclear Explosive Operations Nuclear Material Operations HE Operations Strategies Advance HE Center of Excellence Exemplify a High Reliability Organization Health & Safety Safety Training Occupational Medicine Contractor Safety Environment Environmental Projects & Operations Regulatory Compliance Waste Operations Environmental Management System Environmental Document Library Public Meetings Doing Business With Pantex Procurement How We Buy Subcontracting Opportunities Supplier Information Profile Suspect/Counterfiet Items Business Definitions Documents and Forms Accounts Payable Work for Others Our Capabilities How to do Business with the Pantex eXMC Employee Information Benefits

28

Independent Oversight Assessment of the Nuclear Safety Culture and Management of Nuclear Safety Concerns at the Hanford Site Waste Treatment and Immobilization Plant, January 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety and Security HSS Independent Oversight Assessment of Nuclear Safety Culture and Management of Nuclear Safety Concerns at the Hanford Site Waste Treatment and Immobilization Plant January 2012 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Enforcement and Oversight Abbreviations Used in this Report i Executive Summary iii Recommendations xi 1.0 Introduction 1 1.1 Background 2 1.2 Scope and Methodology 6 2.0 Current Safety Culture 9 2.1 Background 9 2.2 Scope and Methods 10 2.3 ORP (including DOE-WTP) 11 2.4 BNI 11 2.5 WTP Project 12 3.0 ORP Management of Safety Concerns 15 3.1 Corrective Actions for the 2010 HSS Review 15 3.2 Processes for Managing Issues 16

29

Independent Oversight Assessment of the Nuclear Safety Culture and Management of Nuclear Safety Concerns at the Hanford Site Waste Treatment and Immobilization Plant, January 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

Safety and Security HSS Independent Oversight Assessment of Nuclear Safety Culture and Management of Nuclear Safety Concerns at the Hanford Site Waste Treatment and Immobilization Plant January 2012 Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Enforcement and Oversight Abbreviations Used in this Report i Executive Summary iii Recommendations xi 1.0 Introduction 1 1.1 Background 2 1.2 Scope and Methodology 6 2.0 Current Safety Culture 9 2.1 Background 9 2.2 Scope and Methods 10 2.3 ORP (including DOE-WTP) 11 2.4 BNI 11 2.5 WTP Project 12 3.0 ORP Management of Safety Concerns 15 3.1 Corrective Actions for the 2010 HSS Review 15 3.2 Processes for Managing Issues 16

30

NUCLEAR PLANT OPERATIONS AND  

E-Print Network (OSTI)

NUCLEAR PLANT OPERATIONS AND CONTROL KEYWORDS: neutron flux, cur- rent noise, vibration diagnostics: Swedish Nuclear Power Inspectorate SE- 10658 Stockholm, Sweden. NUCLEAR TECHNOLOGY VOL. 131 AUG. 2000 239 by the Swedish Nuclear Power Inspectorate, contract 14.5-980942-98242. REFERENCES 1. A. M. WEINBERG and H. C

Pázsit, Imre

31

Population dose commitments due to radioactive releases from nuclear power plant sites in 1987  

Science Conference Proceedings (OSTI)

Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1987. Fifty-year dose commitments for a one-year exposure from both liquid and atmospheric releases were calculated for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each of 70 reactor sites. This report tabulates the results of these calculations, showing the dose commitments for both water and airborne pathways for each age group and organ. Also included for reach of the sites is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The site average individual dose commitment from all pathways ranged from a low of 2 {times} 10{sup {minus}6} mrem to a high of 0.009 mrem. No attempt was made in this study to determine the maximum dose commitment received by any one individual from the radionuclides released at any of the sites. However, licensee calculation of doses to the maximally exposed individual at some sites indicated values of up to approximately 100 times average individual doses (on the order of a few millirem per year). 2 refs., 2 figs., 7 tabs.

Baker, D.A. (Pacific Northwest Lab., Richland, WA (USA))

1990-08-01T23:59:59.000Z

32

Population dose commitments due to radioactive releases from nuclear power plant sites in 1980  

Science Conference Proceedings (OSTI)

Population radiation dose commitments have been estimated from reported radionuclide releases from commercial power reactors operating during 1980. In addition doses derived from the shutdown reactors at the Three Mile Island site were included. Fifty-year dose commitments from a one-year exposure were calculated from both liquid and atmospheric releases for four population groups (infant, child, teen-ager and adult) residing between 2 and 80 km from each site. This report tabulates the results of these calculations, showing the dose commitments for both liquid and airborne pathways for each age group and organ. Also included for each site is a histogram showing the fraction of the total population within 2 to 80 km around each site receiving various average dose commitments from the airborne pathways. The total dose commitment from both liquid and airborne pathways ranged from a high of 40 person-rem to a low of 0.02 person-rem with an arithmetic mean of 4 person-rem. The total population dose for all sites was estimated at 180 person-rem for the 96 million people considered at risk.

Baker, D.A.; Peloquin, R.A.

1983-08-01T23:59:59.000Z

33

Siting of nuclear facilities. Selections from Nuclear Safety  

SciTech Connect

The report presented siting policy and practice for nuclear power plants as developed in the U.S. and abroad. Twenty-two articles from Nuclear Safety on this general topic are reprinted since they provide a valuable reference source. The appendices also include reprints of some relevant regulatory rules and guides on siting. Advantages and disadvantages of novel siting concepts such as underground containment, offshore siting, and nuclear energy parks are addressed. Other topics include site criteria, risk criteria, and nuclear ship criteria.

Buchanan, J.R.

1976-07-01T23:59:59.000Z

34

Georgia Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

35

Arkansas Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

36

Iowa Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Iowa nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

37

Ohio Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Ohio nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

38

Vermont Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

39

Florida Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Florida nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

40

Virginia Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Missouri Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

42

Nebraska Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Nebraska nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

43

Tennessee Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Tennessee nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

44

Minnesota Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Minnesota nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

45

Arizona Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

46

Massachusetts Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

47

Kansas Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Kansas nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

48

Alabama Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

49

Wisconsin Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Wisconsin nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

50

Texas Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

51

Michigan Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

52

Nuclear Plant Dynamics and Safety - Nuclear Engineering Division (Argonne)  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Systems Nuclear Systems Modeling and Design Analysis > Nuclear Plant Dynamics and Safety Capabilities Nuclear Systems Modeling and Design Analysis Reactor Physics and Fuel Cycle Analysis Overview Current Projects Software Nuclear Plant Dynamics and Safety Nuclear Data Program Advanced Reactor Development Nuclear Waste Form and Repository Performance Modeling Nuclear Energy Systems Design and Development Other Capabilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Reactor Physics and Fuel Cycle Analysis Nuclear Plant Dynamics and Safety Bookmark and Share Activities in Nuclear Plant Dynamics and Safety research and development fulfill a primary goal of the Nuclear Engineering (NE) Division to promote improvements in safe and reliable operation of present and future

53

NUCLEAR POWER PLANT  

DOE Patents (OSTI)

A nuclear power plant for use in an airless environment or other environment in which cooling is difficult is described. The power plant includes a boiling mercury reactor, a mercury--vapor turbine in direct cycle therewith, and a radiator for condensing mercury vapor. (AEC)

Carter, J.C.; Armstrong, R.H.; Janicke, M.J.

1963-05-14T23:59:59.000Z

54

Maryland Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

of State nuclear net generation (percent)","Owner" "Calvert Cliffs Nuclear Power Plant Unit 1, Unit 2","1,705","13,994",100.0,"Calvert Cliffs Nuclear PP Inc" "1 Plant 2...

55

Interim guidelines for protecting fire-fighting personnel from multiple hazards at nuclear plant sites: Final report  

Science Conference Proceedings (OSTI)

This report provides interim guidelines for reducing the impact to fire fighting and other supporting emergency response personnel from the multiple hazards of radiation, heat stress, and trauma when fighting a fire in a United States commercial nuclear power plant. Interim guidelines are provided for fire brigade composition, training, equipment, procedures, strategies, heat stress and trauma. In addition, task definitions are provided to evaluate and further enhance the interim guidelines over the long term. 19 refs.

Klein, A.R.; Bloom, C.W.

1989-07-01T23:59:59.000Z

56

Nuclear Sites Map  

NLE Websites -- All DOE Office Websites (Extended Search)

reactor operations, nuclear research, weapons disassembly, maintenance and testing, hot cell operations, nuclear material storage and processing and waste disposal. Each...

57

Nuclear Plant Decommissioning  

Science Conference Proceedings (OSTI)

In the 1990s several nuclear utilities proceeded with full decommissioning of their nuclear power plants based on perceived economics. This major shift to immediate decommissioning presented a significant challenge to the industry in terms of the development of a decommissioning process and a comprehensive updated regulatory framework. EPRI responded by undertaking the formation of the Decommissioning Support Program. The initial work involved conducting a series of topical workshops directed to specific...

2010-11-24T23:59:59.000Z

58

Groundwater Protection Guidelines for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The nuclear power industry has entered into a voluntary initiative to implement groundwater monitoring programs at all nuclear power plant sites. This EPRI guideline provides essential technical guidance to nuclear power utilities on the necessary elements of a sound groundwater protection program.

2008-01-10T23:59:59.000Z

59

The Next Generation Nuclear Plant  

DOE Green Energy (OSTI)

The Next Generation Nuclear Plant (NGNP) will be a demonstration of the technical, licensing, operational, and commercial viability of High Temperature Gas-Cooled Reactor (HTGR) technology for the production of process heat, electricity, and hydrogen. This nuclear- based technology can provide high-temperature process heat (up to 950°C) that can be used as a substitute for the burning of fossil fuels for a wide range of commercial applications (see Figure 1). The substitution of the HTGR for burning fossil fuels conserves these hydrocarbon resources for other uses, reduces uncertainty in the cost and supply of natural gas and oil, and eliminates the emissions of greenhouse gases attendant with the burning of these fuels. The HTGR is a passively safe nuclear reactor concept with an easily understood safety basis that permits substantially reduced emergency planning requirements and improved siting flexibility compared to other nuclear technologies.

Dr. David A. Petti

2009-01-01T23:59:59.000Z

60

Washington Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Washington nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State...

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Connecticut Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Connecticut nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State...

62

California Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

California nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State...

63

Mississippi Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Mississippi nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State...

64

Louisiana Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Louisiana nuclear power plants, summer capacity and net generation, 2010" "Plant NameTotal Reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

65

Tennessee Nuclear Profile - Watts Bar Nuclear Plant  

U.S. Energy Information Administration (EIA) Indexed Site

Watts Bar Nuclear Plant" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration...

66

Wisconsin Nuclear Profile - Point Beach Nuclear Plant  

U.S. Energy Information Administration (EIA) Indexed Site

Point Beach Nuclear Plant" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration...

67

Illinois Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Illinois nuclear power plants, summer capacity and net generation, 2010" Illinois nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Braidwood Generation Station Unit 1, Unit 2","2,330","19,200",20.0,"Exelon Nuclear" "Byron Generating Station Unit 1, Unit 2","2,300","19,856",20.6,"Exelon Nuclear" "Clinton Power Station Unit 1","1,065","8,612",9.0,"Exelon Nuclear" "Dresden Generating Station Unit 2, Unit 3","1,734","14,593",15.2,"Exelon Nuclear" "LaSalle Generating Station

68

Kansas City Plant | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

| National Nuclear Security Administration | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Locations > Kansas City Plant Kansas City Plant http://honeywell.com/sites/aero-kcp/Pages/Home.aspx Field Office: The Kansas City Field Office (KCFO) stewards the NNSA Kansas City Plant, the principal nonnuclear production site within the nuclear

69

Kansas City Plant | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

| National Nuclear Security Administration | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Locations > Kansas City Plant Kansas City Plant http://honeywell.com/sites/aero-kcp/Pages/Home.aspx Field Office: The Kansas City Field Office (KCFO) stewards the NNSA Kansas City Plant, the principal nonnuclear production site within the nuclear

70

Individualized Site Training | National Nuclear Security Administratio...  

National Nuclear Security Administration (NNSA)

Individualized Site Training | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response...

71

Nuclear power plant design analysis  

SciTech Connect

Information concerning the engineering aspects of the design of commercial nuclear power plants is presented. Topics discussed include: electric utility economics; nuclear plant cconomics; thermal-transport systems and core design; nuclear analysis methods; safcty requirements; fuel-system analysis; dcsign considerations; and optimization approaches. (DCC)

Sesonske, A.

1973-01-01T23:59:59.000Z

72

Revised Livermore seismic hazard estimates for sixty-nine nuclear power plant sites east of the Rocky Mountains. Final report, July 1993--March 1994  

SciTech Connect

The draft version of this report presented updated Lawrence Livermore National Laboratory (LLNL) probabilistic seismic hazard analysis estimates for 69 nuclear power plant sites in the region of the United States east of the Rocky Mountains. LLNL performed a re-elicitation of seismicity and ground motion experts to improve their estimates of uncertainty in seismicity parameters and ground motion models. Using these revised inputs, LLNL updated the seismic hazard estimates documented in NUREG/CR-5250 (1989). These updated hazard estimates will be used in future NRC actions. The draft was issued for public comment in October 1993. By the end of the public comment period, February 28, 1994, comments had been received from two nuclear industry companies. The comments from these companies neither contested nor suggested amendments to the technical data conveyed in the report. Rather, they both suggest changes in the Individual Plant External Event Examination (IPEEE) program scope. This report is not the forum for discussion of the IPEEE program. Possible modification to the scope of the IPEEE will be examined in its own setting. Therefore, there are no technical differences between the draft report and this final report. Any information as to modifications to the IPEEE program will be provided to the public via an NRC general communication.

Sobel, P.

1994-04-01T23:59:59.000Z

73

Owners of nuclear power plants  

Science Conference Proceedings (OSTI)

Commercial nuclear power plants in this country can be owned by a number of separate entities, each with varying ownership proportions. Each of these owners may, in turn, have a parent/subsidiary relationship to other companies. In addition, the operator of the plant may be a different entity as well. This report provides a compilation on the owners/operators for all commercial power reactors in the United States. While the utility industry is currently experiencing changes in organizational structure which may affect nuclear plant ownership, the data in this report is current as of July 1996. The report is divided into sections representing different aspects of nuclear plant ownership.

Hudson, C.R.; White, V.S.

1996-11-01T23:59:59.000Z

74

Pennsylvania Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Pennsylvania nuclear power plants, summer capacity and net generation, 2010" Pennsylvania nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Beaver Valley Unit 1, Unit 2","1,777","14,994",19.3,"FirstEnergy Nuclear Operating Company" "Limerick Unit 1, Unit 2","2,264","18,926",24.3,"Exelon Nuclear" "PPL Susquehanna Unit 1, Unit 2","2,450","18,516",23.8,"PPL Susquehanna LLC" "Peach Bottom Unit 2, Unit 3","2,244","18,759",24.1,"Exelon Nuclear" "Three Mile Island Unit 1",805,"6,634",8.5,"Exelon Nuclear"

75

Groundwater Sampling and Analysis Sourcebook for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

This sourcebook provides technical guidance and best practices for groundwater sampling and analysis at nuclear power plants. Robust sampling and analysis protocols are required to ensure accurate characterization of radionuclides in groundwater.BackgroundNuclear power plants implement groundwater protection programs to minimize contamination of on-site soil and groundwater, and to prevent the off-site migration of licensed material through groundwater ...

2012-09-25T23:59:59.000Z

76

Naval Nuclear Propulsion Plants | National Nuclear Security Administra...  

National Nuclear Security Administration (NNSA)

Naval Nuclear Propulsion Plants In naval nuclear propulsion plants, fissioning of uranium atoms in the reactor core produces heat. Because the fission process also produces...

77

Individualized Site Training | National Nuclear Security Administratio...  

National Nuclear Security Administration (NNSA)

Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Individualized Site Training Home > About Us > Our Programs > Nuclear Security > Nuclear Materials Management &...

78

Energy Secretary to Visit Georgia Nuclear Reactor Site and Tennessee  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secretary to Visit Georgia Nuclear Reactor Site and Secretary to Visit Georgia Nuclear Reactor Site and Tennessee Laboratory to Highlight Administration Support for Nuclear Energy Energy Secretary to Visit Georgia Nuclear Reactor Site and Tennessee Laboratory to Highlight Administration Support for Nuclear Energy February 13, 2012 - 6:16pm Addthis WASHINGTON, D.C. - U.S. Secretary of Energy Secretary Steven Chu will visit the Vogtle nuclear power plant in Waynesboro, Georgia, and Oak Ridge National Laboratory on Wednesday, February 15 to highlight steps the Obama Administration is taking to restart America's nuclear energy industry. In Waynesboro, Secretary Chu will join Southern Company CEO Thomas A. Fanning, Georgia Power CEO W. Paul Bowers, and local leaders for a tour of Vogtle units 3 and 4 -- the site of the first two new nuclear power units

79

North Carolina Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

Carolina nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear...

80

New Hampshire Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (nw)","Net generation (thousand mwh)","Share of State nuclear net...

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

New Jersey Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" "Plant nametotal reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net...

82

Secretary Chu Visits Vogtle Nuclear Power Plant | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vogtle Nuclear Power Plant Vogtle Nuclear Power Plant Secretary Chu Visits Vogtle Nuclear Power Plant February 15, 2012 - 3:54pm Addthis Secretary Chu traveled to Waynesboro, Georgia, to visit the Vogtle nuclear power plant, the site of what will be the first new nuclear reactors to be built in the United States in three decades. | Image credit: Southern Company. Secretary Chu traveled to Waynesboro, Georgia, to visit the Vogtle nuclear power plant, the site of what will be the first new nuclear reactors to be built in the United States in three decades. | Image credit: Southern Company. Niketa Kumar Niketa Kumar Public Affairs Specialist, Office of Public Affairs Just over 60 years ago, scientists in Arco, Idaho, successfully used nuclear energy to power four light bulbs, laying the foundation for U.S.

83

Connecticut Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA)

snpt2ct Millstone Unit 2, Unit 3 2,103 16,750 100.0 Dominion Nuclear Conn Inc 1 Plant 2 Reactors Owner Note: Totals may not equal sum of components due to independent ...

84

Arkansas Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA)

snpt2ar Arkansas Nuclear One Unit 1, Unit 2 1,835 15,023 100.0 Entergy Arkansas Inc 1 Plant 2 Reactors Owner Note: Totals may not equal sum of ...

85

Wisconsin Nuclear Profile - Point Beach Nuclear Plant  

U.S. Energy Information Administration (EIA)

snpt3wi4046 506 3,954 89.2 PWR 512 4,336 96.7 1,018 8,291 93.0 Point Beach Nuclear Plant Unit Type Data for 2010 PWR = Pressurized Light Water Reactor. Note: Totals ...

86

ALARA at nuclear power plants  

SciTech Connect

Implementation of the As Low As Reasonably Achievable (ALARA) principle at nuclear power plants presents a continuing challenge for health physicists at utility corporate and plant levels, for plant designers, and for regulatory agencies. The relatively large collective doses at some plants are being addressed though a variety of dose reduction techniques. It is planned that this report will include material on historical aspects, management, valuation of dose reduction, quantitative and qualitative aspects of optimization, design, operational considerations, and training. The status of this work is summarized in this report. 30 refs., 1 fig., 6 tabs.

Baum, J.W.

1990-01-01T23:59:59.000Z

87

Site map | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

map | National Nuclear Security Administration map | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Site map Site map Front page Front page of National Nuclear Security Administration NNSA Site Navigation Our Mission Managing the Stockpile Stockpile Stewardship Program Quarterly Experiments Dismantlement and Disposition Weapons NPT Compliance

88

Performance of nuclear plant RTDs  

SciTech Connect

Resistance temperature detectors (RTDs) are used for safety-related measurements in nuclear power plants and must therefore be accurate and respond to temperature changes in a timely fashion. Experience has shown that RTD calibration shift and response-time degradation can occur with aging. Therefore, periodic testing is performed to ensure that acceptable performance limits are not exceeded. A new method called the loop current step response (LCSR) test is used for periodic response-time testing of nuclear plant RTDs. This method permits testing the RTD as installed in an operating plant (in situ testing). The LCSR test is based on heating the RTD sensing element with a small electric current applied remotely through the sensor lead wires.

Hashemian, H.M.; Petersen, K.M.

1987-01-01T23:59:59.000Z

89

Nuclear power plants: structure and function  

SciTech Connect

Topics discussed include: steam electric plants; BWR type reactors; PWR type reactors; thermal efficiency of light water reactors; other types of nuclear power plants; the fission process and nuclear fuel; fission products and reactor afterheat; and reactor safety.

Hendrie, J.M.

1983-01-01T23:59:59.000Z

90

Advanced nuclear plant control complex  

DOE Patents (OSTI)

An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

Scarola, Kenneth (Windsor, CT); Jamison, David S. (Windsor, CT); Manazir, Richard M. (North Canton, CT); Rescorl, Robert L. (Vernon, CT); Harmon, Daryl L. (Enfield, CT)

1993-01-01T23:59:59.000Z

91

Energy Secretary to Visit Georgia Nuclear Reactor Site and Tennessee...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Reactor Site and Tennessee Laboratory to Highlight Administration Support for Nuclear Energy Energy Secretary to Visit Georgia Nuclear Reactor Site and Tennessee...

92

National Nuclear Security Administration Pantex Site Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NEP A Compliance Officer Rationale NEP A Compliance Officer Rationale Pantex Site Office Proj. No.: MWO-ll-004-C NEPA ID No.: PXP-ll-0001 Parking Lot South of Bullding 16-35 Application of DOE NEPA Procedure: Categorical Exclusion B1.15, Applicable to Facility Operations (10 CFR Part 1021, Subpart 0, Appendix B), applies to this proposal. Therefore, neither an Environmental Assessment nor an Environmental Impact Statement is necessary for the activity described in NEPA Review Form (NRF) PXP-II-000l, which is hereby incorporated by reference. Rationale: The U.S. Department of Energy, National Nuclear Security Administration, proposes to construct a permanent parking lot south of Building 16-35 on the Pantex Plant. The parking lot would be approximately 220 feet in length and 170 feet wide. Four metal culverts,

93

Groundwater Protection Guidelines for Nuclear Power Plants: Revision 1  

Science Conference Proceedings (OSTI)

The United States nuclear power industry has undertaken a Groundwater Protection Initiative [NEI 07-07] at the direction of the Nuclear Energy Institute (NEI) Nuclear Strategic Issues Advisory Committee (NSIAC). International nuclear power plants implement groundwater protection programs to ensure appropriate management of on-site groundwater and protection of the public and environment. This Electric Power Research Institute (EPRI) guideline provides essential technical guidance to utilities on the ...

2013-10-29T23:59:59.000Z

94

Site Information | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Information | National Nuclear Security Administration Information | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Site Information Home > About Us > Our Programs > Defense Programs > Military Academic Collaborations > Site Information Site Information The NNSA's nuclear security enterprise spans eight sites, including three national laboratories, with more than six decades of cutting-edge nuclear

95

Site Information | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Information | National Nuclear Security Administration Information | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Site Information Home > About Us > Our Programs > Defense Programs > Military Academic Collaborations > Site Information Site Information The NNSA's nuclear security enterprise spans eight sites, including three national laboratories, with more than six decades of cutting-edge nuclear

96

Sabotage at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Recently there has been a noted worldwide increase in violent actions including attempted sabotage at nuclear power plants. Several organizations, such as the International Atomic Energy Agency and the US Nuclear Regulatory Commission, have guidelines, recommendations, and formal threat- and risk-assessment processes for the protection of nuclear assets. Other examples are the former Defense Special Weapons Agency, which used a risk-assessment model to evaluate force-protection security requirements for terrorist incidents at DOD military bases. The US DOE uses a graded approach to protect its assets based on risk and vulnerability assessments. The Federal Aviation Administration and Federal Bureau of Investigation conduct joint threat and vulnerability assessments on high-risk US airports. Several private companies under contract to government agencies use formal risk-assessment models and methods to identify security requirements. The purpose of this paper is to survey these methods and present an overview of all potential types of sabotage at nuclear power plants. The paper discusses emerging threats and current methods of choice for sabotage--especially vehicle bombs and chemical attacks. Potential consequences of sabotage acts, including economic and political; not just those that may result in unacceptable radiological exposure to the public, are also discussed. Applicability of risk-assessment methods and mitigation techniques are also presented.

Purvis, James W.

1999-07-21T23:59:59.000Z

97

Construction or Extended Operation of Nuclear Plant (Vermont) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction or Extended Operation of Nuclear Plant (Vermont) Construction or Extended Operation of Nuclear Plant (Vermont) Construction or Extended Operation of Nuclear Plant (Vermont) < Back Eligibility Investor-Owned Utility Utility Program Info State Vermont Program Type Siting and Permitting Any petition for approval of construction of a nuclear energy generating plant within the state, or any petition for approval of the operation of a nuclear energy generating plant beyond the date established in a certificate of public good issued under this title, must be submitted to the public service board no later than four years before the date upon which the approval may take effect. Upon receipt of a petition for approval of construction or operation as provided under this section, the public service board shall notify the

98

New York Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

nuclear power plants, summer capacity and net generation, 2010" nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Indian Point Unit 2, Unit 3","2,063","16,321",39.0,"Entergy Nuclear Indian Point" "James A Fitzpatrick Unit 1",855,"6,361",15.2,"Entergy Nuc Fitzpatrick LLC" "Nine Mile Point Nuclear Station Unit 1, Unit 2","1,773","14,239",34.0,"Nine Mile Point Nuclear Sta LLC" "R E Ginna Nuclear Power Plant Unit 1",581,"4,948",11.8,"R.E. Ginna Nuclear Power Plant, LLC" "4 Plants

99

Lead Test Assembly Irradiation and Analysis Watts Bar Nuclear Plant,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Lead Test Assembly Irradiation and Analysis Watts Bar Nuclear Lead Test Assembly Irradiation and Analysis Watts Bar Nuclear Plant, Tennessee and Hanford Site, Richland, Washington Lead Test Assembly Irradiation and Analysis Watts Bar Nuclear Plant, Tennessee and Hanford Site, Richland, Washington SUMMARY This EA evaluates the environmental impacts associated with the U.S. Department of Energy proposed action to conduct a lead test assembly program to confirm the viability of using a commercial light water reactor to produce tritium. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD July 22, 1997 EA-1210: Finding of No Significant Impact Lead Test Assembly Irradiation and Analysis Watts Bar Nuclear Plant, Tennessee and Hanford Site, Richland, Washington July 22, 1997 EA-1210: Final Environmental Assessment

100

Postconstruction report of the United Nuclear Corporation Disposal Site at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

Remedial actions conducted under the auspices of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) were completed at the Y-12 United Nuclear Corporation (UNC) Disposal Site in August 1992. The purpose of this Postconstruction Report is to summarize numerous technical reports and provide CERCLA documentation for completion of the remedial actions. Other CERCLA reports, such as the Feasibility Study for the UNC Disposal Site, provide documentation leading up to the remedial action decision. The remedial action chosen, placement of a modified RCRA cap, was completed successfully, and performance standards were either met or exceeded. This remedial action provided solutions to two environmentally contaminated areas and achieved the goal of minimizing the potential for contamination of the shallow groundwater downgradient of the site, thereby providing protection of human health and the environment. Surveillance and maintenance of the cap will be accomplished to ensure cap integrity, and groundwater monitoring downgradient of the site will continue to confirm the acceptability of the remedial action chosen.

Oakley, L.B.; Siberell, J.K.; Voskuil, T.L.

1993-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Savannah River Site | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Site | National Nuclear Security Administration Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Locations > Savannah River Site Savannah River Site http://www.srs.gov/general/srs-home.html Field Office: Located south of Aiken, South Carolina, the Savannah River Field Office (SRFO) is responsible for the NNSA Defense Program missions at

102

Savannah River Site | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Site | National Nuclear Security Administration Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Locations > Savannah River Site Savannah River Site http://www.srs.gov/general/srs-home.html Field Office: Located south of Aiken, South Carolina, the Savannah River Field Office (SRFO) is responsible for the NNSA Defense Program missions at

103

DOE Announces Loan Guarantee Applications for Nuclear Power Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Announces Loan Guarantee Applications for Nuclear Power Plant DOE Announces Loan Guarantee Applications for Nuclear Power Plant Construction DOE Announces Loan Guarantee Applications for Nuclear Power Plant Construction October 2, 2008 - 3:43pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced it has received 19 Part I applications from 17 electric power companies for federal loan guarantees to support the construction of 14 nuclear power plants in response to its June 30, 2008 solicitation. The applications reflect the intentions of those companies to build 21 new reactors, with some applications covering two reactors at the same site. All five reactor designs that have been certified, or are currently under review for possible certification, by the Nuclear Regulatory Commission (NRC) are

104

DOE Announces Loan Guarantee Applications for Nuclear Power Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loan Guarantee Applications for Nuclear Power Plant Loan Guarantee Applications for Nuclear Power Plant Construction DOE Announces Loan Guarantee Applications for Nuclear Power Plant Construction October 2, 2008 - 3:43pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced it has received 19 Part I applications from 17 electric power companies for federal loan guarantees to support the construction of 14 nuclear power plants in response to its June 30, 2008 solicitation. The applications reflect the intentions of those companies to build 21 new reactors, with some applications covering two reactors at the same site. All five reactor designs that have been certified, or are currently under review for possible certification, by the Nuclear Regulatory Commission (NRC) are represented in the Part I applications. DOE also has received Part I

105

Nuclear Plant/Hydrogen Plant Safety: Issues and Approaches  

DOE Green Energy (OSTI)

The U.S. Department of Energy, through its agents the Next Generation Nuclear Plant Project and the Nuclear Hydrogen Initiative, is working on developing the technologies to enable the large scale production of hydrogen using nuclear power. A very important consideration in the design of a co-located and connected nuclear plant/hydrogen plant facility is safety. This study provides an overview of the safety issues associated with a combined plant and discusses approaches for categorizing, quantifying, and addressing the safety risks.

Steven R. Sherman

2007-06-01T23:59:59.000Z

106

Balance of Plant Corrosion Issues in Aging Nuclear Power Plants  

Science Conference Proceedings (OSTI)

... number of times, can be used to forecast the most probable number of leaks. ... Conditions for Long Term Operation of Nuclear Power Plants in Sweden.

107

Maryland Nuclear Profile - Calvert Cliffs Nuclear Power Plant  

U.S. Energy Information Administration (EIA) Indexed Site

Calvert Cliffs Nuclear Power Plant" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License...

108

New York Nuclear Profile - R E Ginna Nuclear Power Plant  

U.S. Energy Information Administration (EIA) Indexed Site

R E Ginna Nuclear Power Plant" "Unit","Summer Capacity (MW)","Net Generation (Thousand MWh)","Summer Capacity Factor (Percent)","Type","Commercial Operation Date","License...

109

Organizational learning at nuclear power plants  

E-Print Network (OSTI)

The Nuclear Power Plant Advisory Panel on Organizational Learning provides channels of communications between the management and organization research projects of the MIT International Program for Enhanced Nuclear Power ...

Carroll, John S.

1991-01-01T23:59:59.000Z

110

Nuclear power plant construction activity, 1988  

SciTech Connect

Nuclear Power Plant Construction Activity 1988 presents cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1988. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors.

1989-06-14T23:59:59.000Z

111

Materials in Nuclear Power Plant Construction - TMS  

Science Conference Proceedings (OSTI)

139th Annual Meeting & Exhibition. February 14 - 18, 2010, Washington State Convention Center, Seattle, Washington USA. Materials in Nuclear Power. Plant  ...

112

Steam Reheat in Nuclear Power Plants.  

E-Print Network (OSTI)

??In this work, reheating steam from a commercial nuclear power plant is explored in order to increase efficiency and power output. A thermal source in… (more)

Marotta, Paul John

2012-01-01T23:59:59.000Z

113

Plant succession on disturbed sites in four plant associations in the Northern Mojave Desert  

SciTech Connect

The US Department of Energy (DOE) is characterizing Yucca Mountain Nevada, as a potential site for long-term underground storage of high-level nuclear waste. DOE is committed to reclaim all lands disturbed by the project, and return them to a stable ecological state, with a composition and productivity similar to predisturbance conditions. A study was implemented to assess plant species which naturally invade disturbed sites in the Yucca Mountain Project Area. In 1991 and 1992 study plots were established on disturbed sites. Sites were characterized by disturbance type (i.e., road, drill pad, etc.), disturbance severity, vegetation association, time since abandonment, and topographic placement. Density of all perennial plant species was measured on disturbed and undisturbed plots. The species with the highest density in disturbed sites was Chrysothamnus teretifolia. This species was not a major contributor in undisturbed sites. In the undisturbed sites Ambrosia dumosa had the highest density of perennial plant species but was also high in density in the disturbance sites. Total species density was higher in undisturbed sites compared to disturbed sites. Plant species density analysis compared disturbed and undisturbed vegetation associations. Results will be used to design reclamation field trails and to finalize the Yucca Mountain Project Reclamation Implementation Plan.

Gabbert, W.D.; Schultz, B.W.; Angerer, J.P.; Ostler, W.K.

1993-12-31T23:59:59.000Z

114

Secretary Bodman Announces Federal Risk Insurance for Nuclear Power Plants  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Federal Risk Insurance for Nuclear Power Federal Risk Insurance for Nuclear Power Plants & Touts Robust Economy Secretary Bodman Announces Federal Risk Insurance for Nuclear Power Plants & Touts Robust Economy August 4, 2006 - 8:42am Addthis ATLANTA, GA - After touring Georgia Power and speaking to its employees, U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced completion of the final rule that establishes the process for utility companies building the next six new nuclear power plants in the United States to qualify for a portion of $2 billion in federal risk insurance. The rule will be available on DOE's web site soon. "Providing federal risk insurance is an important step in speeding the nuclear renaissance in this country," Secretary Bodman said. "Companies

115

Pantex Plant | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

Plant | National Nuclear Security Administration Plant | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our Locations > Pantex Plant Pantex Plant http://www.pantex.com/ Field Office: The NNSA Production Office is responsible for contract management and oversight of the Pantex Plant in Amarillo, Texas and the Y-12 National Security Complex in Oak Ridge, Tenn. The Pantex Plant is

116

PROPOSED AMENDMENT TO THE NUCLEAR POWER PLANT  

E-Print Network (OSTI)

NOTE TO EDITORS: The Nuclear Regulatory Commission has received two reports from its independent Advisory Committee on Reactor Safeguards. The attached reports, in the form of letters, comment on a proposed amendment to the NRC's rule on license renewal for nuclear power plants and a proposed revision to the decommissioning rule for nuclear power reactors. Attachments:

T. S. Kress

1995-01-01T23:59:59.000Z

117

Nuclear Power Plant Concrete Structures  

Science Conference Proceedings (OSTI)

A nuclear power plant (NPP) involves complex engineering structures that are significant items of the structures, systems and components (SSC) important to the safe and reliable operation of the NPP. Concrete is the commonly used civil engineering construction material in the nuclear industry because of a number of advantageous properties. The NPP concrete structures underwent a great degree of evolution, since the commissioning of first NPP in early 1960. The increasing concern with time related to safety of the public and environment, and degradation of concrete structures due to ageing related phenomena are the driving forces for such evolution. The concrete technology underwent rapid development with the advent of chemical admixtures of plasticizer/super plasticizer category as well as viscosity modifiers and mineral admixtures like fly ash and silica fume. Application of high performance concrete (HPC) developed with chemical and mineral admixtures has been witnessed in the construction of NPP structures. Along with the beneficial effect, the use of admixtures in concrete has posed a number of challenges as well in design and construction. This along with the prospect of continuing operation beyond design life, especially after 60 years, the impact of extreme natural events ( as in the case of Fukushima NPP accident) and human induced events (e.g. commercial aircraft crash like the event of September 11th 2001) has led to further development in the area of NPP concrete structures. The present paper aims at providing an account of evolution of NPP concrete structures in last two decades by summarizing the development in the areas of concrete technology, design methodology and construction techniques, maintenance and ageing management of concrete structures.

Basu, Prabir [International Atomic Energy Agency (IAEA)] [International Atomic Energy Agency (IAEA); Labbe, Pierre [Electricity of France (EDF)] [Electricity of France (EDF); Naus, Dan [Oak Ridge National Laboratory (ORNL)] [Oak Ridge National Laboratory (ORNL)

2013-01-01T23:59:59.000Z

118

Extra-Territorial Siting of Nuclear Installations  

Science Conference Proceedings (OSTI)

Arrangements might be created for siting nuclear installations on land ceded by a host State for administration by an international or multinational organization. Such arrangements might prove useful in terms of resolving suspicions of proliferation in troubled areas of the world, or as a means to introduce nuclear activities into areas where political, financial or technical capabilities might otherwise make such activities unsound, or as a means to enable global solutions to be instituted for major nuclear concerns (e.g., spent fuel management). The paper examines practical matters associated with the legal and programmatic aspects of siting nuclear installations, including diplomatic/political frameworks, engaging competent industrial bodies, protection against seizure, regulation to ensure safety and security, waste management, and conditions related to the dissolution of the extra-territorial provisions as may be agreed as the host State(s) achieve the capabilities to own and operate the installations. The paper considers the potential for using such a mechanism across the spectrum of nuclear power activities, from mining to geological repositories for nuclear waste. The paper considers the non-proliferation dimensions associated with such arrangements, and the pros and cons affecting potential host States, technology vendor States, regional neighbors and the international community. It considers in brief potential applications in several locations today.

Shea, Thomas E.; Morris, Frederic A.

2009-10-07T23:59:59.000Z

119

Plutonium Processing Plant Deactivated | National Nuclear Security  

NLE Websites -- All DOE Office Websites (Extended Search)

Processing Plant Deactivated | National Nuclear Security Processing Plant Deactivated | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > Plutonium Processing Plant Deactivated Plutonium Processing Plant Deactivated June 20, 1997 Hanford, WA Plutonium Processing Plant Deactivated The Plutonium Uranium Extraction Facility (PUREX), the largest of the

120

Plutonium Processing Plant Deactivated | National Nuclear Security  

National Nuclear Security Administration (NNSA)

Processing Plant Deactivated | National Nuclear Security Processing Plant Deactivated | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > Plutonium Processing Plant Deactivated Plutonium Processing Plant Deactivated June 20, 1997 Hanford, WA Plutonium Processing Plant Deactivated The Plutonium Uranium Extraction Facility (PUREX), the largest of the

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Chu Visits Site of America's First New Nuclear Reactor in Three Decades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chu Visits Site of America's First New Nuclear Reactor in Three Chu Visits Site of America's First New Nuclear Reactor in Three Decades Chu Visits Site of America's First New Nuclear Reactor in Three Decades February 15, 2012 - 12:40pm Addthis WASHINGTON, D.C. - Just two days after the Department of Energy requested more than $770 million for nuclear energy in 2013, U.S. Secretary of Energy Steven Chu visited the Vogtle nuclear power plant in Waynesboro, Georgia and Oak Ridge National Laboratory to highlight the steps the Obama Administration is taking to restart America's nuclear industry as part of an all-of-the-above American energy strategy. During remarks to more than 500 workers at the Vogtle nuclear power plant, Secretary Chu highlighted the wide variety of steps the Obama Administration has taken to help restart America's nuclear energy

122

Chu Visits Site of America's First New Nuclear Reactor in Three Decades |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chu Visits Site of America's First New Nuclear Reactor in Three Chu Visits Site of America's First New Nuclear Reactor in Three Decades Chu Visits Site of America's First New Nuclear Reactor in Three Decades February 15, 2012 - 2:12pm Addthis Just two days after the Department of Energy requested more than $770 million for nuclear energy in 2013, U.S. Secretary of Energy Steven Chu visited the Vogtle nuclear power plant in Waynesboro, Georgia and Oak Ridge National Laboratory to highlight the steps the Obama Administration is taking to restart America's nuclear industry as part of an all-of-the-above American energy strategy. During remarks to more than 500 workers at the Vogtle nuclear power plant, Secretary Chu highlighted the wide variety of steps the Obama Administration has taken to help restart America's nuclear energy

123

National Nuclear Security Administration Pantex Site Office  

NLE Websites -- All DOE Office Websites (Extended Search)

DCARTER at 3:47 pm, Jan 11, 2008 DCARTER at 3:47 pm, Jan 11, 2008 c Department of Energy National Nuclear Security Administration Pantex Site Office P. 0. Box 30030 Amarillo, TX 791 20 MhdWswQAtwbWM JAN 3 2008 MEMORANDUM FOR: Dennis Huddleston, EP&O, B&W Pantex LLC FROM: & Site Engineering Programs SUBJECT: Interagency Agreement (LQG) for the Pantex Superfund Site (Pantex or Pantex Site) Please reference the attached Environmental Protection Agency (EPA) letter dated December 1 1,2007, subject as above. Subject letter was informally transmitted to B&W Pantex's Regulatory Compliance Department on December 19,2007, to expedite any subsequent requirements by the Pantex Site. The enclosed IAG identifies specific review and response times for each of the participating agencies

124

DOE Announces Loan Guarantee Applications for Nuclear Power Plant...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Loan Guarantee Applications for Nuclear Power Plant Construction DOE Announces Loan Guarantee Applications for Nuclear Power Plant Construction October 2, 2008 - 3:43pm Addthis...

125

Plant Support Engineering: Elastomer Handbook for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

On a daily basis, engineers and maintenance personnel make judgments regarding the capabilities, degradation, and longevity of elastomeric material and its compatibility with other materials. Although most applications of elastomers in nuclear power plants are not unique to the industry, there is an extra emphasis in certain applications with regard to reliability, quality, and resistance to nuclear-plant-specific environments. Existing resources on elastomers are extensive, but they are not tailored to ...

2007-08-20T23:59:59.000Z

126

Nuclear Power Plant NDE Challenges — Past, Present, and Future  

Science Conference Proceedings (OSTI)

The operating fleet of U.S. nuclear power plants was built to fossil plant standards (of workmanship

S. R. Doctor

2007-01-01T23:59:59.000Z

127

New York Nuclear Profile - R E Ginna Nuclear Power Plant  

U.S. Energy Information Administration (EIA)

snpt3ny6122 581 4,948 97.2 PWR R E Ginna Nuclear Power Plant Unit Summer Capacity (MW) Net Generation (Thousand MWh) Summer Capacity Factor (Percent) Type

128

PIA - Savannah River Nuclear Solutions Badge Request and Site...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PIA - 10th International Nuclear Graphite Specialists Meeting registration web site MOX Services Unclassified Information System PIA, National Nuclear Services Administration...

129

Signature Metabolites at Manufactured Gas Plant Sites  

Science Conference Proceedings (OSTI)

This report presents results of research to demonstrate the biodegradation component of natural attenuation at former manufactured gas plant (MGP) sites. Researchers developed a target compound list of signature metabolites, biochemical intermediates of mono- and polycyclic aromatic hydrocarbon (MAH and PAH) biodegradation. They identified and tested appropriate methods of chemical analysis for these metabolites in MGP groundwater and sediments. Emphasis was placed on identifying natural microbiological ...

2008-10-14T23:59:59.000Z

130

Project Prioritization for Nuclear Plant Investments  

Science Conference Proceedings (OSTI)

Evaluating investments, sometimes called project prioritization, is a central business process in a plant's or fleet's management of their nuclear assets. To date, a variety of project prioritization approaches have been used in the nuclear industry. Many nuclear utilities use an approach that can be characterized as an engineering work grading process. Project prioritization is related closely to long-range planning. Long-range plans help to avoid surprises from increased expenditures and reduced levels...

2008-12-23T23:59:59.000Z

131

Nuclear power plant construction activity, 1986  

SciTech Connect

Cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1986, are presented. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors.

1987-07-24T23:59:59.000Z

132

The Politically Correct Nuclear Energy Plant  

E-Print Network (OSTI)

- and downstream processes Risks due to power plant emissions Coal Lignite Gas CC Nuclear PV (amorph) Wind Hydro-proliferation and waste. Then BUILD one! #12;Modular Pebble Bed Reactor Thermal Power 250 MW Core Height 10.0 m Core Product Barrier · Core Physics · Safety · Balance of Plant Design · Modularity Design · Core Power

133

Nuclear power plant construction activity 1987  

SciTech Connect

This annual report published by the Energy Information Administration (EIA) presents data on nuclear power plant construction activity. The previous report, Nuclear Power Plant Construction Activity 1986, included data for units that, as of December 31, 1986, were (1) in the construction pipeline, (2) canceled, or (3) commercial operation as of December 31, 1986. The data in this report, which were collected on Form EIA-254, ''Semiannual Report on Status of Reactor Construction,'' update the data in the previous report to be current as of December 31, 1987. Three types of information are included: plant characteristics and ownership; construction costs; and construction schedules and milestone dates.

1988-06-09T23:59:59.000Z

134

US nuclear power plant operating cost and experience summaries  

Science Conference Proceedings (OSTI)

NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

Kohn, W.E.; Reid, R.L.; White, V.S.

1998-02-01T23:59:59.000Z

135

Land use suitability screening for power plant sites in Maryland  

SciTech Connect

Since 1974 Oak Ridge National Laboratory (ORNL) has been engaged in developing an automated procedure for land use suitability screening. The Nuclear Regulatory Commission has funded the project to aid in the selection of power plant sites in Maryland. Its purpose is to identify candidate areas from which specific candidate sites can be chosen for detailed analyses. The ORNL approach assures that certain key variables are examined empirically for every cell in the study region before candidate sites are selected. Each variable is assigned an importance weight and compatibility score based upon its effect on the economic, social, or ecologic costs associated with construction in a given cell. The weighted scores for each variable are aggregated and output as a suitability score for each cell. (auth)

Dobson, J.E.

1975-01-01T23:59:59.000Z

136

South Carolina Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA) Indexed Site

South Carolina nuclear power plants, summer capacity and net generation, 2010" South Carolina nuclear power plants, summer capacity and net generation, 2010" "Plant name/total reactors","Summer capacity (mw)","Net generation (thousand mwh)","Share of State nuclear net generation (percent)","Owner" "Catawba Unit 1, Unit 2","2,258","18,964",36.5,"Duke Energy Carolinas, LLC" "H B Robinson Unit 2",724,"3,594",6.9,"Progress Energy Carolinas Inc" "Oconee Unit 1, Unit 2, Unit 3","2,538","20,943",40.3,"Duke Energy Carolinas, LLC" "V C Summer Unit 1",966,"8,487",16.3,"South Carolina Electric&Gas Co" "4 Plants 7 Reactors","6,486","51,988",100.0

137

Nuclear Power Plant Design Project  

E-Print Network (OSTI)

................................................. 22 5.1.16 Decommissioning: AP600, HTGR, ALWR ............................................................................................................... 35 7.3.4 Decommissioning Cost #12;9 decommissioning. The long delayed nuclear waste disposal facility at Yucca Mountain is becoming

138

Missouri Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA)

snpt2mo Callaway Unit 1 1,190 8,996 100.0 Union Electric Co 1 Plant 1 Reactor Owner Note: Totals may not equal sum of components due to independent rounding.

139

Preliminary Evaluation of Removing Used Nuclear Fuel From Shutdown Sites |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Evaluation of Removing Used Nuclear Fuel From Shutdown Evaluation of Removing Used Nuclear Fuel From Shutdown Sites Preliminary Evaluation of Removing Used Nuclear Fuel From Shutdown Sites In January 2013, the Department of Energy issued the Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste. Among the elements contained in this strategy is an initial focus on accepting used nuclear fuel from shutdown reactor sites. This focus is consistent with the recommendations of the Blue Ribbon Commission on America's Nuclear Future, which identified removal of stranded used nuclear fuel at shutdown sites as a priority so that these sites may be completely decommissioned and put to other beneficial uses. Shutdown sites are defined as those commercial nuclear power reactor sites where the

140

Remediation of Soil at Nuclear Sites  

Science Conference Proceedings (OSTI)

As the major nuclear waste and decontamination and decommissioning projects progress, one of the remaining problems that faces the nuclear industry is that of site remediation. The range of contamination levels and contaminants is wide and varied and there is likely to be a significant volume of soil contaminated with transuranics and hazardous organic materials that could qualify as mixed TRU waste. There are many technologies that offer the potential for remediating this waste but few that tackle all or most of the contaminants and even fewer that have been deployed with confidence. This paper outlines the progress made in proving the ability of Supercritical Fluid Extraction as a method of remediating soil, classified as mixed (TRU) transuranic waste.

Holmes, R.; Boardman, C.; Robbins, R; Fox, Robert Vincent; Mincher, Bruce Jay

2000-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Remediation of soil at nuclear sites  

SciTech Connect

As the major nuclear waste and decontamination and decommissioning projects progress, one of the remaining problems that faces the nuclear industry is that of site remediation. The range of contamination levels and contaminants is wide and varied and there is likely to be a significant volume of soil contaminated with transuranics and hazardous organic materials that could qualify as mixed TRU waste. There are many technologies that offer the potential for remediating this waste but few that tackle all or most of the contaminants and even fewer that have been deployed with confidence. This paper outlines the progress made in proving the ability of Supercritical Fluid Extraction as a method of remediating soil, classified as mixed (TRU) transuranic waste

R. Holmes; C. Boardman; R. Robbins (BNFL); R. Fox; B. J. Mincher (INEEL)

2000-02-28T23:59:59.000Z

142

Texas Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA)

snpt2tx Comanche Peak Unit 1, Unit 2 2,406 20,208 48.9 Luminant Generation Company LLC South Texas Project Unit 1, Unit 2 2,560 21,127 51.1 STP Nuclear Operating Co

143

Nuclear plant cancellations: causes, costs, and consequences  

Science Conference Proceedings (OSTI)

This study was commissioned in order to help quantify the effects of nuclear plant cancellations on the Nation's electricity prices. This report presents a historical overview of nuclear plant cancellations through 1982, the costs associated with those cancellations, and the reasons that the projects were terminated. A survey is presented of the precedents for regulatory treatment of the costs, the specific methods of cost recovery that were adopted, and the impacts of these decisions upon ratepayers, utility stockholders, and taxpayers. Finally, the report identifies a series of other nuclear plants that remain at risk of canellation in the future, principally as a result of similar demand, finance, or regulatory problems cited as causes of cancellation in the past. The costs associated with these potential cancellations are estimated, along with their regional distributions, and likely methods of cost recovery are suggested.

Not Available

1983-04-01T23:59:59.000Z

144

Proceedings: EPRI/NEI Technical Information Workshop - Nuclear Plant Groundwater Monitoring  

Science Conference Proceedings (OSTI)

The EPRI Groundwater Protection Workshop focused on the subject of groundwater monitoring related to nuclear plant sites. This subject is very important to both decommissioning and operating plants. The Workshop provided information to assist operating plants in the development of technically sound plant site groundwater monitoring programs. Presentations provided the latest information on groundwater assessments, such as related tools, strategies, technologies and experience. The program included inform...

2007-07-19T23:59:59.000Z

145

Seismic Isolation of Nuclear Power Plants  

Science Conference Proceedings (OSTI)

With increasing public concern for seismic safety in general and research findings that indicate that seismic hazards may be larger than expected in many parts of the world, it would be prudent for the nuclear industry to consider more fully the potential benefits, costs, and impediments associated with applying seismic isolation more widely and to identify actions needed to develop practical and cost-effective guidelines for the application of seismic isolation to nuclear power plants (NPPs) and ...

2013-10-28T23:59:59.000Z

146

Virtual environments for nuclear power plant design  

SciTech Connect

In the design and operation of nuclear power plants, the visualization process inherent in virtual environments (VE) allows for abstract design concepts to be made concrete and simulated without using a physical mock-up. This helps reduce the time and effort required to design and understand the system, thus providing the design team with a less complicated arrangement. Also, the outcome of human interactions with the components and system can be minimized through various testing of scenarios in real-time without the threat of injury to the user or damage to the equipment. If implemented, this will lead to a minimal total design and construction effort for nuclear power plants (NPP).

Brown-VanHoozer, S.A.; Singleterry, R.C. Jr.; King, R.W. [and others

1996-03-01T23:59:59.000Z

147

Nuclear facility decommissioning and site remedial actions  

SciTech Connect

The 394 abstracted references on environmental restoration, nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the eleventh in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types -- technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions -- have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Programs, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Grand Junction Remedial Action Program, (7) Uranium Mill Tailings Management, (8) Technical Measurements Center, (9) Remedial Action Program, and (10) Environmental Restoration Program. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication title. Indexes are provided for author, corporate affiliation, title word, publication description, geographic location, subject category, and keywords. This report is a product of the Remedial Action Program Information Center (RAPIC), which selects and analyzes information on remedial actions and relevant radioactive waste management technologies.

Knox, N.P.; Webb, J.R.; Ferguson, S.D.; Goins, L.F.; Owen, P.T.

1990-09-01T23:59:59.000Z

148

Nuclear facility decommissioning and site remedial actions  

SciTech Connect

The 576 abstracted references on nuclear facility decommissioning, uranium mill tailings management, and site remedial actions constitute the tenth in a series of reports prepared annually for the US Department of Energy's Remedial Action Programs. Citations to foreign and domestic literature of all types--technical reports, progress reports, journal articles, symposia proceedings, theses, books, patents, legislation, and research project descriptions--have been included. The bibliography contains scientific, technical, economic, regulatory, and legal information pertinent to the US Department of Energy's Remedial Action Programs. Major sections are (1) Surplus Facilities Management Program, (2) Nuclear Facilities Decommissioning, (3) Formerly Utilized Sites Remedial Action Program, (4) Facilities Contaminated with Naturally Occurring Radionuclides, (5) Uranium Mill Tailings Remedial Action Program, (6) Uranium Mill Tailings Management, (7) Technical Measurements Center, and (8) General Remedial Action Program Studies. Within these categories, references are arranged alphabetically by first author. Those references having no individual author are listed by corporate affiliation or by publication description. Indexes are provided for author, corporate affiliation, title work, publication description, geographic location, subject category, and keywords.

Owen, P.T.; Knox, N.P.; Ferguson, S.D.; Fielden, J.M.; Schumann, P.L.

1989-09-01T23:59:59.000Z

149

Pantex Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Pantex Site Pantex Site The primary mission of the Pantex Plant is the assembly, disassembly, testing, and evaluation of nuclear wespons in support of the NNSA stockpile...

150

Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites  

SciTech Connect

This report fulfills the M2 milestone M2FT-13PN0912022, “Stranded Sites De-Inventorying Report.” In January 2013, the U.S. Department of Energy (DOE) issued the Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (DOE 2013). Among the elements contained in this strategy is an initial focus on accepting used nuclear fuel from shutdown reactor sites. This focus is consistent with the recommendations of the Blue Ribbon Commission on America’s Nuclear Future, which identified removal of stranded used nuclear fuel at shutdown sites as a priority so that these sites may be completely decommissioned and put to other beneficial uses (BRC 2012). Shutdown sites are defined as those commercial nuclear power reactor sites where the nuclear power reactors have been shut down and the site has been decommissioned or is undergoing decommissioning. In this report, a preliminary evaluation of removing used nuclear fuel from 12 shutdown sites was conducted. The shutdown sites were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, and San Onofre. These sites have no other operating nuclear power reactors at their sites and have also notified the U.S. Nuclear Regulatory Commission that their reactors have permanently ceased power operations and that nuclear fuel has been permanently removed from their reactor vessels. Shutdown reactors at sites having other operating reactors are not included in this evaluation.

Maheras, Steven J.; Best, Ralph E.; Ross, Steven B.; Buxton, Kenneth A.; England, Jeffery L.; McConnell, Paul E.

2013-09-30T23:59:59.000Z

151

Holdup measurement for nuclear fuel manufacturing plants  

Science Conference Proceedings (OSTI)

The assay of nuclear material holdup in fuel manufacturing plants is a laborious but often necessary part of completing the material balance. A range of instruments, standards, and a methodology for assaying holdup has been developed. The objectives of holdup measurement are ascertaining the amount, distribution, and how firmly fixed the SNM is. The purposes are reconciliation of material unbalance during or after a manufacturing campaign or plant decommissioning, to decide security requirements, or whether further recovery efforts are justified.

Zucker, M.S.; Degen, M.; Cohen, I.; Gody, A.; Summers, R.; Bisset, P.; Shaub, E.; Holody, D.

1981-07-13T23:59:59.000Z

152

Nuclear plant construction and investment risk  

SciTech Connect

Escalated cost estimations, delays and cancellations in nuclear construction have caused a preoccupation with the risks of nuclear power plant construction that dominates utility stock investment, overshadowing increased earnings per share and recent growth in production. The issue will be resolved when increased power demand requires new construction, but the effect has so far been to erode the economic advantage of nuclear power and threaten the ability of utilities to get rate increases high enough to cover their costs. Projected delays and cost escalations and their effects must go into an economic appraisal of the investment risks.

Studness, C.M.

1984-07-05T23:59:59.000Z

153

Site map | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure...

154

Maryland Nuclear Profile - Calvert Cliffs Nuclear Power Plant  

U.S. Energy Information Administration (EIA)

snpt3md6011 855 6,755 90.2 PWR 850 7,239 97.2 1,705 13,994 93.7 Calvert Cliffs Nuclear Power Plant Unit Type Data for 2010 PWR = Pressurized Light Water Reactor.

155

Probabilistic methods in seismic risk assessment for nuclear power plants: proceedings  

SciTech Connect

The state-of-the-art in seismic risk analysis applied to the design and siting of nuclear power plants was addressed in this meeting. Presentations were entered individually into the date base. (ACR)

Not Available

1983-01-01T23:59:59.000Z

156

Groundwater Monitoring Guidance for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Recent experience has shown that the initial design of nuclear power plant groundwater characterization programs can have a significant impact upon the resources needed to demonstrate regulatory compliance. This document provides technical experience and lessons learned in designing an optimized groundwater investigation program.

2005-09-06T23:59:59.000Z

157

Overview of Trends in Nuclear Power Plant Sensors and Instrumentation  

NLE Websites -- All DOE Office Websites (Extended Search)

Trends in Nuclear Power Plant Sensors and Instrumentation SASAN BAKTIARI Nuclear Engineering Division Argonne National Laboratory Ph: (630) 252-8982 bakhtiati@anl.gov Abstract -...

158

How much electricity does a typical nuclear power plant generate ...  

U.S. Energy Information Administration (EIA)

... (kWh). There were 65 nuclear power plants with 104 operating nuclear reactors that generated a total of 790 billion kilowatt-hours (kWh), ...

159

Characterization and Dose Modeling of Soil, Sediment and Bedrock During Nuclear Power Plant Decommissioning  

Science Conference Proceedings (OSTI)

A decommissioning nuclear power plant must confirm that the radionuclides present in the soils, sediments, and bedrock left on site at the time of license termination will meet the appropriate dose limits for site release. This process involves the characterization, dose modeling, and if required, remediation, of these media. At some decommissioning nuclear power plants, the management of contaminated soil, sediments, and bedrocks was a major project that led to generation of remediation projects and rad...

2009-11-20T23:59:59.000Z

160

National Nuclear Security Administration Nevada Site Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

93-851 8 93-851 8 JAM 1 4 2010 Scott Blake Harris, General Counsel, DOEiHQ (GC-1) FORS NATIONAL NUCLEAR SECURITY ADMINISTRATION NEVADA SITE OFFICE (NNSA/NSO) NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) ANNUAL PLANNING SUMMARY Pursuant to DOE Order 451. IB, NEPA Compliance Program, NNSA/NSO is pleased to provide the enclosed Annual NEPA Planning Summary. The document provides a brief description of ongoing and planned NEPA actions for calendar year 201 0. If there are any questions regarding this summary, please contact our NEPA Compliance Officer, Linda M. Cohn, at (702) 295-0077. s r4/(&~1/:~d Stephen A. Mellington Enclosure: As stated cc wtencl. via e-mail: C. M. Borgstrom, DOEiHQ (GC-54) FORS B. A. Costner, DOEiHQ (GC-54) FORS M. E. Martin, NNSAIHQ (NA-56) FORS

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Site Selection for Concrete Batch Plant to Support Plutonium Disposition Facilities at the Savannah River Site  

Science Conference Proceedings (OSTI)

WSRC conducted a site selection study to identify, assess, and rank candidate sites for an onsite concrete batch plant at the Savannah River Site in the vicinity of F-Area.

Wike, L.D.

2001-06-15T23:59:59.000Z

162

Reprocessing of nuclear fuels at the Savannah River Plant  

Science Conference Proceedings (OSTI)

For more than 30 years, the Savannah River Plant (SRP) has been a major supplier of nuclear materials such as plutonium-239 and tritium-3 for nuclear and thermonuclear weapons, plutonium-238 for space exploration, and isotopes of americium, curium, and californium for use in the nuclear research community. SRP is a complete nuclear park, providing most of the processes in the nuclear fuel cycle. Key processes involve fabrication and cladding of the nuclear fuel, target, and control assemblies; rework of heavy water for use as reactor moderator; reactor loading, operation, and unloading; chemical recovery of the reactor transmutation products and spent fuels; and management of the gaseous, liquid, and solid nuclear and chemical wastes; plus a host of support operations. The site's history and the key processes from fabrication of reactor fuels and targets to finishing of virgin plutonium for use in the nuclear weapons complex are reviewed. Emphasis has been given to the chemistry of the recovery and purification of weapons grade plutonium from irradiated reactor targets.

Gray, L.W.

1986-10-04T23:59:59.000Z

163

Trojan Nuclear Power Plant Reactor Vessel and Internals Removal: Trojan Nuclear Plant Decommissioning Experience  

Science Conference Proceedings (OSTI)

One goal of the EPRI Decommissioning Technology Program is to capture the growing utility experience in nuclear plant decommissioning activities for the benefit of other utilities facing similar challenges in the future. This report provides historical information on the background, scope, organization, schedule, cost, contracts, and support activities associated with the Trojan Nuclear Plant Reactor Vessel and Internals Removal (RVAIR) Project. Also discussed are problems, successes, and lessons learned...

2000-10-16T23:59:59.000Z

164

FTCP Site Specific Information - Chief of Nuclear Safety | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of Nuclear Safety FTCP Site Specific Information - Chief of Nuclear Safety FTCP Agent Organization Name Phone E-Mail CNS Richard Lagdon 202586-9471 chip.lagdon@hq.doe.gov...

165

SIGNAL GROUPING FOR CONDITION MONITORING OF NUCLEAR POWER PLANT COMPONENTS  

E-Print Network (OSTI)

SIGNAL GROUPING FOR CONDITION MONITORING OF NUCLEAR POWER PLANT COMPONENTS Piero Baraldi between those used to monitor the reactor coolant pump of a Pressurized Water Reactor (PWR) is considered Monitoring, Empirical Modeling, Power Plants, Safety Critical Nuclear Instrumentation, Autoassociative models

166

Extended outages at several nuclear plants led to high outage ...  

U.S. Energy Information Administration (EIA)

Outages at U.S. nuclear power plants so far in 2012 are generally higher than in recent years because of extended forced outages at four nuclear power plants.

167

Advanced nuclear plant control room complex  

DOE Patents (OSTI)

An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

Scarola, Kenneth (Windsor, CT); Jamison, David S. (Windsor, CT); Manazir, Richard M. (North Canton, CT); Rescorl, Robert L. (Vernon, CT); Harmon, Daryl L. (Enfield, CT)

1993-01-01T23:59:59.000Z

168

International Cooperation on Safety of Nuclear Plants - Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

169

Radiological Assessment of effects from Fukushima Daiichi Nuclear Power Plant  

Energy.gov (U.S. Department of Energy (DOE))

NNSA presentation on Radiological Assessment of effects from Fukushima Daiichi Nuclear Power Plant from May 13, 2011

170

Engineering Fundamentals - Nuclear Power Plant Materials, Version 2.0  

Science Conference Proceedings (OSTI)

The Engineering Fundamentals - Nuclear Power Plant Materials (EF-Materials) Version 2.0 computer-based training module provides new-hire engineering personnel with an overview of the basic concepts of nuclear power plant materials. Graphics and interactive features are used to enhance learning.EF-Materials covers the basic terms and concepts related to nuclear power plant materials and provides information about the significance of material degradation issues in nuclear power plants. ...

2012-11-30T23:59:59.000Z

171

Office of Material Consolidation & Civilian Sites | National Nuclear  

National Nuclear Security Administration (NNSA)

Material Consolidation & Civilian Sites | National Nuclear Material Consolidation & Civilian Sites | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Office of Material Consolidation & Civilian Sites Home > About Us > Our Programs > Nonproliferation > Nuclear Nonproliferation Program Offices > Office of International Material

172

Early Site Permit Demonstration Program: Plant parameters envelope report. Volume 1  

Science Conference Proceedings (OSTI)

The Early Site Permit (ESP) Demonstration Program is the nuclear industry`s initiative for piloting the early resolution of siting-related issues before the detailed design proceedings of the combined operating license review. The ESP Demonstration Program consists of three phases. The plant parameters envelopes task is part of Phase 1, which addresses the generic review of applicable federal regulations and develops criteria for safety and environmental assessment of potential sites. The plant parameters envelopes identify parameters that characterize the interface between an ALWR design and a potential site, and quantify the interface through values selected from the Utility Requirements Documents, vendor design information, or engineering assessments. When augmented with site-specific information, the plant parameters envelopes provide sufficient information to allow ESPs to be granted based on individual ALWR design information or enveloping design information for the evolutionary, passive, or generic ALWR plants. This document is expected to become a living document when used by future applicants.

Not Available

1993-03-01T23:59:59.000Z

173

Los Alamos Site Office Nuclear Maintenance Management Program...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Evaluations Activity Report for the Los Alamos Site Office Nuclear Maintenance Management Program Oversight Self-Assessment Dates of Activity : 11142011 - 11182011 Report...

174

Record of Decision for the Savannah River Site Spent Nuclear...  

NLE Websites -- All DOE Office Websites (Extended Search)

Management Final Environmental Impact Statement, Aiken, SC AGENCY: Department of Energy (DOE). ACTION: Record of decision. SUMMARY: The Savannah River Site Spent Nuclear Fuel...

175

National Nuclear Security Administration LOS ALAMOS SITE OFFICE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

LOS ALAMOS SITE OFFICE National Nuclear Security Administration CONTRACT MANAGEMENT PLAN For LOS ALAMOS NATIONAL LABORATORY CONTRACT NO. DE-AC52-06NA25396 Los Alamos...

176

Defense Nuclear Facilitiets Safety Board Visit and Site Lead...  

NLE Websites -- All DOE Office Websites (Extended Search)

Office of Safety and Emergency Management Evaluations Activity Report for the Defense Nuclear Facilities Safety Board Visit and Site Lead Planning Activities at the Los Alamos...

177

Operational Awareness Site Visi to the Pantex Plant, October...  

NLE Websites -- All DOE Office Websites (Extended Search)

Activity Report - Rev. 0 Report Number: HIAR PTX-2011-10-28 Site: Pantex Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations...

178

National Security Complex (Y-12), Pantex Plant Site (PX), & Savannah...  

NLE Websites -- All DOE Office Websites (Extended Search)

I am looking at DE-SOL-0001458 "Management & Operating (M&O) for Y-12 National Security Complex (Y-12), Pantex Plant Site (PX), & Savannah River Site (SRS)." Any word on...

179

Balance of Plant Requirements for a Nuclear Hydrogen Plant  

DOE Green Energy (OSTI)

This document describes the requirements for the components and systems that support the hydrogen production portion of a 600 megawatt thermal (MWt) Next Generation Nuclear Plant (NGNP). These systems, defined as the "balance-of-plant" (BOP), are essential to operate an effective hydrogen production plant. Examples of BOP items are: heat recovery and heat rejection equipment, process material transport systems (pumps, valves, piping, etc.), control systems, safety systems, waste collection and disposal systems, maintenance and repair equipment, heating, ventilation, and air conditioning (HVAC), electrical supply and distribution, and others. The requirements in this document are applicable to the two hydrogen production processes currently under consideration in the DOE Nuclear Hydrogen Initiative. These processes are the sulfur iodide (S-I) process and the high temperature electrolysis (HTE) process. At present, the other two hydrogen production process - the hybrid sulfur-iodide electrolytic process (SE) and the calcium-bromide process (Ca-Br) -are under flow sheet development and not included in this report. While some features of the balance-of-plant requirements are common to all hydrogen production processes, some details will apply only to the specific needs of individual processes.

Bradley Ward

2006-04-01T23:59:59.000Z

180

THE NEXT GENERATION NUCLEAR PLANT GRAPHITE PROGRAM  

Science Conference Proceedings (OSTI)

Developing new nuclear grades of graphite used in the core of a High Temperature Gas-cooled Reactor (HTGR) is one of the critical development activities being pursued within the Next Generation Nuclear Plant (NGNP) program. Graphite’s thermal stability (in an inert gas environment), high compressive strength, fabricability, and cost effective price make it an ideal core structural material for the HTGR reactor design. While the general characteristics necessary for producing nuclear grade graphite are understood, historical “nuclear” grades no longer exist. New grades must be fabricated, characterized, and irradiated to demonstrate that current grades of graphite exhibit acceptable non-irradiated and irradiated properties upon which the thermo-mechanical design of the structural graphite in NGNP is based. The NGNP graphite R&D program has selected a handful of commercially available types for research and development activities necessary to qualify this nuclear grade graphite for use within the NGNP reactor. These activities fall within five primary areas; 1) material property characterization, 2) irradiated material property characterization, 3) modeling, and 4) ASTM test development, and 5) ASME code development efforts. Individual research and development activities within each area are being pursued with the ultimate goal of obtaining a commercial operating license for the nuclear graphite from the US NRC.

William E. Windes; Timothy D. Burchell; Robert L. Bratton

2008-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Nuclear Plant Life Cycle Management Implementation Guide  

Science Conference Proceedings (OSTI)

The day-to-day pressures of operation, limited budgets, and regulatory scrutiny of nuclear power plants focus on the present or short term, and may preempt cost-beneficial activities with long-term pay-off. This guide to implementing life-cycle management (LCM) fosters long-range thinking and decision making focused on profitability in the new competitive era of electricity production.

1998-11-19T23:59:59.000Z

182

Florida Electrical Power Plant Siting Act (Florida) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Electrical Power Plant Siting Act (Florida) Electrical Power Plant Siting Act (Florida) Florida Electrical Power Plant Siting Act (Florida) < Back Eligibility Agricultural Commercial Construction Developer Fed. Government Industrial Installer/Contractor Institutional Investor-Owned Utility Local Government Municipal/Public Utility Retail Supplier Rural Electric Cooperative Systems Integrator Tribal Government Utility Savings Category Buying & Making Electricity Solar Program Info State Florida Program Type Siting and Permitting Provider Florida Department of Environmental Protection The Power Plant Siting Act (PPSA) is the state's centralized process for licensing large power plants. One license-a certification- replaces local and state permits. Local governments and state agencies within whose jurisdiction the power plant is to be built participate in the process. For

183

Program on Technology Innovation: The Effects of High-Frequency Ground Motion on Structures, Components, and Equipment in Nuclear Po wer Plants  

Science Conference Proceedings (OSTI)

A current and significant area of uncertainty for nuclear siting approval in the Central and Eastern United States (CEUS) is resolution of an appropriate treatment of the high-frequency component of site-specific seismic design response spectra for many planned nuclear plants. Existing nuclear power plants have been designed using either the site-independent Regulatory Guide 1.60 design spectrum shape or other site-independent spectral shapes. More recent probabilistic hazard-based site-specific spectra ...

2007-06-29T23:59:59.000Z

184

Radiation Emergency Assistance Center / Training Site | National Nuclear  

NLE Websites -- All DOE Office Websites (Extended Search)

Radiation Emergency Assistance Center / Training Site | National Nuclear Radiation Emergency Assistance Center / Training Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Radiation Emergency Assistance Center / Training Site Home > About Us > Our Programs > Emergency Response > Responding to Emergencies > Consequence Management > Radiation Emergency Assistance

185

Nuclear power plant performance assessment pertaining to plant aging in France and the United States  

E-Print Network (OSTI)

The effect of aging on nuclear power plant performance has come under increased scrutiny in recent years. The approaches used to make an assessment of this effect strongly influence the economics of nuclear power plant ...

Guyer, Brittany (Brittany Leigh)

2013-01-01T23:59:59.000Z

186

Power Plant Research and Siting Program (Maryland) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Plant Research and Siting Program (Maryland) Power Plant Research and Siting Program (Maryland) Power Plant Research and Siting Program (Maryland) < Back Eligibility Investor-Owned Utility Municipal/Public Utility Retail Supplier Rural Electric Cooperative Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Maryland Program Type Siting and Permitting Provider Maryland Department of Natural Resources The Power Plant Research and Siting Act of 1971 established the Power Plant Research Program (PPRP) to evaluate electric generation issues in the state and recommend responsible, long-term solutions. The program manages a consolidated review of all issues related to power generation in Maryland: it reviews applications, evaluates impacts, and recommends conditions for

187

Minnesota Power Plant Siting Act (Minnesota) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power Plant Siting Act (Minnesota) Power Plant Siting Act (Minnesota) Minnesota Power Plant Siting Act (Minnesota) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Residential Installer/Contractor Rural Electric Cooperative Tribal Government Low-Income Residential Schools Retail Supplier Institutional Multi-Family Residential Systems Integrator Fuel Distributor Nonprofit General Public/Consumer Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Minnesota Program Type Siting and Permitting This Act regulates the siting of large electric power generating plants, which are defined as plants designed for or capable of operating with a

188

Rocky Flats Plant Site Environmental Report for 1992  

Science Conference Proceedings (OSTI)

The Rocky Rats Plant Site Environmental Report provides summary information on the plant`s environmental monitoring programs and the results recorded during 1992. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population.

Cirrincione, D.A.; Erdmann, N.L. [eds.

1992-12-31T23:59:59.000Z

189

Workers Demolish Metals Plant at Paducah Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Demolish Metals Plant at Paducah Site Demolish Metals Plant at Paducah Site Workers Demolish Metals Plant at Paducah Site February 21, 2013 - 12:00pm Addthis The Metals Plant is shown before workers removed panels from the structure ln 2012. The Metals Plant is shown before workers removed panels from the structure ln 2012. Workers remove panels from the Metals Plant in September 2012. Workers remove panels from the Metals Plant in September 2012. About half of the complex was demolished by the end of December 2012, ahead of schedule. About half of the complex was demolished by the end of December 2012, ahead of schedule. An ultra-high-reach demolition machine — similar to equipment used to demolish Yankee Stadium — cuts into upper portions of the building’s last standing section late last month.

190

Safety Oversight of Decommissioning Activities at DOE Nuclear Sites  

Science Conference Proceedings (OSTI)

The Defense Nuclear Facilities Safety Board (Board) is an independent federal agency established by Congress in 1988 to provide nuclear safety oversight of activities at U.S. Department of Energy (DOE) defense nuclear facilities. The activities under the Board's jurisdiction include the design, construction, startup, operation, and decommissioning of defense nuclear facilities at DOE sites. This paper reviews the Board's safety oversight of decommissioning activities at DOE sites, identifies the safety problems observed, and discusses Board initiatives to improve the safety of decommissioning activities at DOE sites. The decommissioning of former defense nuclear facilities has reduced the risk of radioactive material contamination and exposure to the public and site workers. In general, efforts to perform decommissioning work at DOE defense nuclear sites have been successful, and contractors performing decommissioning work have a good safety record. Decommissioning activities have recently been completed at sites identified for closure, including the Rocky Flats Environmental Technology Site, the Fernald Closure Project, and the Miamisburg Closure Project (the Mound site). The Rocky Flats and Fernald sites, which produced plutonium parts and uranium materials for defense needs (respectively), have been turned into wildlife refuges. The Mound site, which performed R and D activities on nuclear materials, has been converted into an industrial and technology park called the Mound Advanced Technology Center. The DOE Office of Legacy Management is responsible for the long term stewardship of these former EM sites. The Board has reviewed many decommissioning activities, and noted that there are valuable lessons learned that can benefit both DOE and the contractor. As part of its ongoing safety oversight responsibilities, the Board and its staff will continue to review the safety of DOE and contractor decommissioning activities at DOE defense nuclear sites.

Zull, Lawrence M.; Yeniscavich, William [Defense Nuclear Facilities Safety Board, 625 Indiana Ave., NW, Suite 700, Washington, DC 20004-2901 (United States)

2008-01-15T23:59:59.000Z

191

Analysis of nuclear power plant construction costs  

SciTech Connect

The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs.

1986-01-01T23:59:59.000Z

192

The Acceptance Strategy for Nuclear Power Plant In Indonesia  

SciTech Connect

Indonesia has planned to build nuclear power plants. Some feasibility studies have been conducted intensively. However, the processes of NPP introduction are still uncertain. National Energy Plan in Indonesia, which has been made by some governmental agencies, does not yet give positive impact to the government decision to construct the nuclear power plant (NPP). This paper discusses the process of NPP introduction in Indonesia, which has been colored with debate of stakeholder and has delayed decision for go-nuclear. The technology paradigm is used to promote NPP as an alternative of reliable energy resources. This paradigm should be complemented with international politic-economic point of view. The international politic-economic point of view shows that structural powers, consisting of security, production, finance, and knowledge structures, within which the NPP is introduced, have dynamic characteristics. The process of NPP introduction in Indonesia contains some infrastructure development (R and D, legislation, regulation, energy planning, site study, public acceptance efforts, etc), but they need a better coherent NPP implementation program and NPP Acceptance Program. Strategic patterns for NPP acceptance described in this paper are made by considering nuclear regulation development and the interest of basic domestic participation. The first NPP program in Indonesia having proven technology and basic domestic participation is and important milestone toward and optimal national energy-mix.

Suhaemi, Tjipta [Centre for Reactor Technology and Nuclear Safety, National Nuclear Energy Agency of Indonesia (Indonesia); Syaukat, Achmad [Centre for Nuclear Technology Business, National Nuclear Energy Agency of Indonesia, Kawasan PUSPIPTEK, Serpong-Tangerang Selatan (Indonesia)

2010-06-22T23:59:59.000Z

193

Korea Hydro & Nuclear Power Co., Ltd. Nuclear Power Plants: Construction and Technology Experience  

Science Conference Proceedings (OSTI)

The Korean nuclear power industry has grown rapidly since Kori Unit 1, the first Korean nuclear power plant (NPP), which began operation in April 1978. Following the technology developments of the nuclear power industry in 1980s, the first standard Korean nuclear plants (Ulchin Units 3 and 4) were constructed in the 1990s. At present, 20 NPP units operate in Korea16 pressurized water reactor (PWR) plants and four pressurized heavy water reactor (PHWR) plants; eight PWR units are under construction. This ...

2011-09-21T23:59:59.000Z

194

Validation of seismic probabilistic risk assessments of nuclear power plants  

SciTech Connect

A seismic probabilistic risk assessment (PRA) of a nuclear plant requires identification and information regarding the seismic hazard at the plant site, dominant accident sequences leading to core damage, and structure and equipment fragilities. Uncertainties are associated with each of these ingredients of a PRA. Sources of uncertainty due to seismic hazard and assumptions underlying the component fragility modeling may be significant contributors to uncertainty in estimates of core damage probability. Design and construction errors also may be important in some instances. When these uncertainties are propagated through the PRA, the frequency distribution of core damage probability may span three orders of magnitude or more. This large variability brings into question the credibility of PRA methods and the usefulness of insights to be gained from a PRA. The sensitivity of accident sequence probabilities and high-confidence, low probability of failure (HCLPF) plant fragilities to seismic hazard and fragility modeling assumptions was examined for three nuclear power plants. Mean accident sequence probabilities were found to be relatively insensitive (by a factor of two or less) to: uncertainty in the coefficient of variation (logarithmic standard deviation) describing inherent randomness in component fragility; truncation of lower tail of fragility; uncertainty in random (non-seismic) equipment failures (e.g., diesel generators); correlation between component capacities; and functional form of fragility family. On the other hand, the accident sequence probabilities, expressed in the form of a frequency distribution, are affected significantly by the seismic hazard modeling, including slopes of seismic hazard curves and likelihoods assigned to those curves.

Ellingwood, B. [Johns Hopkins Univ., Baltimore, MD (United States). Dept. of Civil Engineering

1994-01-01T23:59:59.000Z

195

Nuclear Plant Analyzer: Installation manual. Volume 1  

SciTech Connect

This report contains the installation instructions for the Nuclear Plant Analyzer (NPA) System. The NPA System consists of the Computer Visual System (CVS) program, the NPA libraries, the associated utility programs. The NPA was developed at the Idaho National Engineering Laboratory under the sponsorship of the US Nuclear Regulatory Commission to provide a highly flexible graphical user interface for displaying the results of these analysis codes. The NPA also provides the user with a convenient means of interactively controlling the host program through user-defined pop-up menus. The NPA was designed to serve primarily as an analysis tool. After a brief introduction to the Computer Visual System and the NPA, an analyst can quickly create a simple picture or set of pictures to aide in the study of a particular phenomenon. These pictures can range from simple collections of square boxes and straight lines to complex representations of emergency response information displays.

Snider, D.M.; Wagner, K.L.; Grush, W.H.; Jones, K.R. [Idaho National Engineering Lab., Idaho Falls, ID (United States)]|[Lockheed Idaho Technologies Co., Idaho Falls, ID (United States)

1995-01-01T23:59:59.000Z

196

Secondary plant succession on disturbed sites at Yucca Mountain, Nevada  

SciTech Connect

This report presents the results of a study of secondary plant succession on disturbed sites created during initial site investigations in the late 1970s and early 1980s at Yucca Mountain, NV. Specific study objectives were to determine the rate and success of secondary plant succession, identify plant species found in disturbances that may be suitable for site-specific reclamation, and to identify environmental variables that influence succession on disturbed sites. During 1991 and 1992, fifty seven disturbed sites were located. Vegetation parameters, disturbance characteristics and environmental variables were measured at each site. Disturbed site vegetation parameters were compared to that of undisturbed sites to determine the status of disturbed site plant succession. Vegetation on disturbed sites, after an average of ten years, was different from undisturbed areas. Ambrosia dumosa, Chrysothamnus teretifolius, Hymenoclea salsola, Gutierrezia sarothrae, Atriplex confertifolia, Atriplex canescens, and Stephanomeria pauciflora were the most dominant species across all disturbed sites. With the exception of A. dumosa, these species were generally minor components of the undisturbed vegetation. Elevation, soil compaction, soil potassium, and amounts of sand and gravel in the soil were found to be significant environmental variables influencing the species composition and abundance of perennial plants on disturbed sites. The recovery rate for disturbed site secondary succession was estimated. Using a linear function (which would represent optimal conditions), the recovery rate for perennial plant cover, regardless of which species comprised the cover, was estimated to be 20 years. However, when a logarithmic function (which would represent probable conditions) was used, the recovery rate was estimated to be 845 years. Recommendations for future studies and site-specific reclamation of disturbances are presented.

Angerer, J.P.; Ostler, W.K.; Gabbert, W.D.; Schultz, B.W.

1994-12-01T23:59:59.000Z

197

Lempke visits Savannah River Site | National Nuclear Security  

National Nuclear Security Administration (NNSA)

visits Savannah River Site | National Nuclear Security visits Savannah River Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > Lempke visits Savannah River Site Lempke visits Savannah River Site Posted By Office of Public Affairs NNSA Associate Principal Deputy Administrator Michael Lempke recently visited the Savannah River Site, getting an up-close look at facilities

198

Letter to NEAC to Review the Next Generation Nuclear Plant Activities |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to NEAC to Review the Next Generation Nuclear Plant to NEAC to Review the Next Generation Nuclear Plant Activities Letter to NEAC to Review the Next Generation Nuclear Plant Activities The Next Generation Nuclear Plant (NGNP) project was established under the Energy Policy Act in August 2005 (EPACT-2005). EPACT-2005 defined an overall plan and timetable for NGNP research, design, licensing, construction and operation by the end of FY 2021. At the time that EPACT-2005 was passed, it was envisioned that key aspects of the project included: NGNP is based on R&D activities supported by the Gen-IV Nuclear Energy initiative; ï‚· NGNP is to be used to generate electricity, to produce hydrogen or (to do) both; ï‚· The Idaho National Laboratory (INL) will be the lead national lab for the project; ï‚· NGNP will be sited at the INL in

199

National Nuclear Secutffy Admlnlsbrrtlon NEVADA SITE OFFICE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Secutffy Admlnlsbrrtlon Secutffy Admlnlsbrrtlon NEVADA SITE OFFICE CONTRACT MANAGEMENT PLAN for CONTRACT NO. DE-AC52-06NA25946 with NATIONAL SECURITY TECHNOLOGIES, LLC Jose Stephen A. ~ e l l ; l ~ t o n , Manager Nevada Site Office Date Nevada Site Office Contract Management Plan December 17.2008 Table of Contents ................................................................. ABBREVIATIONS AND ACRONYMS 3 .................................................................................. 1.0 INTRODUCTION 4 ............................................................................................ 2.0 PURPOSE 5 .................................................................................... 2.1 Applicability 6 ...................................................................... 2.2 Updates and Distribution 6

200

Operational Awareness Site Visi to the Pantex Plant, October 2011  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Activity Report - Rev. 0 Report Number: HIAR PTX-2011-10-28 Activity Report - Rev. 0 Report Number: HIAR PTX-2011-10-28 Site: Pantex Plant Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for the Operational Awareness Site Visit to the Pantex Plant Dates of Activity: 10/24/2011 - 10/28/2011 Report Preparer William Macon Activity Description/Purpose: The purpose of this Office of Health, Safety and Security (HSS) operational awareness site visit was for the Pantex Plant site lead to discuss the design/construction of the new high explosives pressing facility (HEPF) and the scheduling of fiscal year (FY) 2012 independent oversight activities. Result: The HSS site lead attended daily Integrated Plan of the Day meetings and met with numerous Pantex Site Office (PXSO)

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Site Information | National Nuclear Security Administration  

NLE Websites -- All DOE Office Websites (Extended Search)

nonproliferation, bio threats, global climate modeling and other critical problems. NTS Nevada National Security Site (NNSS), near Las Vegas, Nev., is where the U.S....

202

A COMPARISON OF THE NUCLEAR DEFENSE CAPABILITIES ON NUCLEAR AND COAL-FIRED POWER PLANTS. FUEL COST STUDY VARIOUS REACTORS AT 100 AND 300 Mwe  

SciTech Connect

Appendices C and D may further be identified as SL1925 and CF-61-12- 20(Rev.), respectively. A comparative report is presented in which the economics and feasibility of plant protection from nuclear attack by plant hardening, remote siting, and utilization of optional fueling concepts for the coal-fired plant are evaluated. (J.R.D.)

Gift, E.H.

1962-05-29T23:59:59.000Z

203

Recent Progress in U.S. Nuclear Power Plant Safety  

NLE Websites -- All DOE Office Websites (Extended Search)

Recent Progress in U.S. Nuclear Power Plant Safety Speaker(s): Robert Budnitz Date: April 15, 2010 - 12:00pm Location: 90-3122 The U.S. commercial nuclear-power industry consists...

204

Electromagnetic Compatibility in Nuclear Power Plants  

SciTech Connect

Electromagnetic compatibility (EMC) has long been a key element of qualification for mission critical instrumentation and control (I&C) systems used by the U.S. military. The potential for disruption of safety-related I&C systems by electromagnetic interference (EMI), radio-frequency interference (RFI), or power surges is also an issue of concern for the nuclear industry. Experimental investigations of the potential vulnerability of advanced safety systems to EMI/RFI, coupled with studies of reported events at nuclear power plants (NPPs) that are attributed to EMI/RFI, confirm the safety significance of EMC for both analog and digital technology. As a result, Oak Ridge National Laboratory has been engaged in the development of the technical basis for guidance that addresses EMC for safety-related I&C systems in NPPs. This research has involved the identification of engineering practices to minimize the potential impact of EMI/RFI and power surges and an evaluation of the ambient electromagnetic environment at NPPs to tailor those practices for use by the nuclear industry. Recommendations for EMC guidance have been derived from these research findings and are summarized in this paper.

Ewing, P.D.; Kercel, S.W.; Korsah, K.; Wood, R.T.

1999-08-29T23:59:59.000Z

205

Federal Register Notice: National Nuclear Security Administration Site-Wide  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Register Notice: National Nuclear Security Administration Register Notice: National Nuclear Security Administration Site-Wide Environmental Impact Statement for Sandia National Laboratories, New Mexico (SNL/NM) Federal Register Notice: National Nuclear Security Administration Site-Wide Environmental Impact Statement for Sandia National Laboratories, New Mexico (SNL/NM) Federal Register / Vol. 76, No. 156 / Friday, August 12, 2011 / Notices. National Nuclear Security Administration Site-Wide Environmental Impact Statement for Sandia National Laboratories, New Mexico (SNL/NM). NNSA.SWEIS_.SNL_.NM_.pdf More Documents & Publications EIS-0466: Re-opening of Public Scoping Period and Announcement of Additional Public Scoping Meetings EIS-0466: Notice of Intent to Prepare an Environmental Impact Statement EIS-0281: Notice of Intent to Prepare a Site-Wide Environmental Impact

206

Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Massive Cement Pour into Hanford Site Nuclear Facility Underway: Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery Act Funding Puts U Canyon in Home Stretch of Demolition Preparations Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery Act Funding Puts U Canyon in Home Stretch of Demolition Preparations June 14, 2011 - 12:00pm Addthis Media Contacts Andre Armstrong, CH2M HILL Plateau Remediation Company (509) 376-6773 Andre_L_Armstrong@rl.gov Geoff Tyree, DOE (509) 376-4171 Geoffrey.Tyree@rl.doe.gov RICHLAND, Wash. - Hanford workers are pouring enough cement-like material to fill six Olympic-size wimming pools in one of the U.S. Department of Energy's (DOE) largest nuclear facilities at the Hanford Site in southeast Washington State to prepare the massive building for demolition.

207

Trinity Site - World's First Nuclear Explosion | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Manhattan Project » Signature Manhattan Project » Signature Facilities » Trinity Site - World's First Nuclear Explosion Trinity Site - World's First Nuclear Explosion Trinity Site - World's First Nuclear Explosion The world's first nuclear explosion occurred on July 16, 1945, when a plutonium implosion device was tested at a site located 210 miles south of Los Alamos on the barren plains of the Alamogordo Bombing Range, known as the Jornada del Muerto. Inspired by the poetry of John Donne, J. Robert Oppenheimer code-named the test Trinity. Hoisted atop a 150-foot tower, the plutonium device, or Gadget, detonated at precisely 5:30 a.m. over the New Mexico desert, releasing 18.6 kilotons of power, instantly vaporizing the tower and turning the surrounding asphalt and sand into green glass.

208

NNSA labs, sites receive DOE Sustainability Awards | National Nuclear  

National Nuclear Security Administration (NNSA)

labs, sites receive DOE Sustainability Awards | National Nuclear labs, sites receive DOE Sustainability Awards | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > NNSA labs, sites receive DOE Sustainability Awards NNSA labs, sites receive DOE Sustainability Awards Posted By Office of Public Affairs In keeping with NNSA's commitment to improving the way it does business,

209

Oak Ridge, Tenn. Selected as Uranium Enrichment Site | National Nuclear  

National Nuclear Security Administration (NNSA)

Oak Ridge, Tenn. Selected as Uranium Enrichment Site | National Nuclear Oak Ridge, Tenn. Selected as Uranium Enrichment Site | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > About Us > Our History > NNSA Timeline > Oak Ridge, Tenn. Selected as Uranium Enrichment Site Oak Ridge, Tenn. Selected as Uranium Enrichment Site September 19, 1942 Oak Ridge, TN

210

Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Massive Cement Pour into Hanford Site Nuclear Facility Underway: Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery Act Funding Puts U Canyon in Home Stretch of Demolition Preparations Massive Cement Pour into Hanford Site Nuclear Facility Underway: Recovery Act Funding Puts U Canyon in Home Stretch of Demolition Preparations June 14, 2011 - 12:00pm Addthis Media Contacts Andre Armstrong, CH2M HILL Plateau Remediation Company (509) 376-6773 Andre_L_Armstrong@rl.gov Geoff Tyree, DOE (509) 376-4171 Geoffrey.Tyree@rl.doe.gov RICHLAND, Wash. - Hanford workers are pouring enough cement-like material to fill six Olympic-size wimming pools in one of the U.S. Department of Energy's (DOE) largest nuclear facilities at the Hanford Site in southeast Washington State to prepare the massive building for demolition.

211

Sensitivity analysis for the outages of nuclear power plants  

E-Print Network (OSTI)

Feb 17, 2012 ... Abstract: Nuclear power plants must be regularly shut down in order to perform refueling and maintenance operations. The scheduling of the ...

212

How much electricity does a typical nuclear power plant generate ...  

U.S. Energy Information Administration (EIA)

How much electricity does a typical nuclear power plant generate? ... tariff, and demand charge data? How is electricity used in U.S. homes?

213

Need for process/radiochemists at nuclear power plants  

SciTech Connect

Viewgraphs are presented concerning the operating requirements for chemists at nuclear power plants. The number of positions available, job duties, and training requirements are reviewed.

Wymer, R.G.; Skrable, K.W.; Alexander, E.L.

1984-01-01T23:59:59.000Z

214

Guideline for Online Monitoring of Nuclear Power Plants: Volume 2  

Science Conference Proceedings (OSTI)

This report continues a series of guidelines that assist member utilities in developing an online monitoring (OLM) program for equipment condition assessment at nuclear power plants.

2011-12-16T23:59:59.000Z

215

MANAGING MODERNIZATION OF NUCLEAR POWER PLANT INSTRUMENTATION AND CONTROL SYSTEMS  

E-Print Network (OSTI)

Managing modernization of nuclear power plant instrumentation and control systems February 2004The originating Section of this publication in the IAEA was:

unknown authors

2003-01-01T23:59:59.000Z

216

Risk-informed incident management for nuclear power plants  

E-Print Network (OSTI)

Decision making as a part of nuclear power plant operations is a critical, but common, task. Plant management is forced to make decisions that may have safety and economic consequences. Formal decision theory offers the ...

Smith, Curtis Lee, 1966-

2002-01-01T23:59:59.000Z

217

Pinellas Plant annual site environmental report for calendar year 1993  

Science Conference Proceedings (OSTI)

Martin Marietta Specialty Components, Inc., and the US Department of Energy are committed to successfully administering a high quality Environmental Management Program at the Pinellas Plant in Pinellas County, Florida. Part of this commitment includes accurately documenting and communicating to the Pinellas Plant stakeholder the results of their environmental compliance and monitoring activities. The Annual Site Environmental Report presents a comprehensive summary of the results of the environmental monitoring, waste management, and environmental restoration programs at the Pinellas Plant for 1993. This report also includes the plant`s performance in the areas of compliance with applicable regulatory requirements and standards and identifies major environmental management program initiatives and accomplishments for 1993.

Not Available

1994-06-10T23:59:59.000Z

218

National Nuclear Security Administration Pantex Site Office  

NLE Websites -- All DOE Office Websites (Extended Search)

M M m I Nudeor hriiy Adminisbnabn JAN - 7 2009 MEMORANDUM FOR: W. R. Mairson, Environment, Safety, & Health, B&W Pantex FROM: Johnnie F. Guelker, Assistant Manager for Environmental & Site Engineering Programs SUBJECT: Notice of Approval of an On-Site Sewage Facility Please reference the attached Texas Commission on Environmental Quality (TCEQ) letter dated December 16,2008, subject as above. Attached letter notifies the Pantex Site Office that the On-Site Sewage Facility (OSSF) has satisfied the design, construction, and installation requirements of the TCEQ and pursuant to Title 30, Texas Administrative Code (TAC). TCEQ has approved the OSSF constructed under TCEQ ID No.: 033- 0245 and the final inspection occurred on December 16,2008.

219

Idaho Site Obtains Patent for Nuclear Reactor Sodium Cleanup Treatment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Site Obtains Patent for Nuclear Reactor Sodium Cleanup Idaho Site Obtains Patent for Nuclear Reactor Sodium Cleanup Treatment Idaho Site Obtains Patent for Nuclear Reactor Sodium Cleanup Treatment March 28, 2013 - 12:00pm Addthis CWI engineers Jeff Jones, David Tolman, right, and Kirk Dooley (seated) developed a treatment to safely dissolve a bicarbonate crust and treat and remove the sodium in the Experimental Breeder Reactor-II at the Idaho site. CWI engineers Jeff Jones, David Tolman, right, and Kirk Dooley (seated) developed a treatment to safely dissolve a bicarbonate crust and treat and remove the sodium in the Experimental Breeder Reactor-II at the Idaho site. Piping in the east boiler basement of the sodium processing building was color coded for easy identification. Orange indicates sodium and green identifies cooling water.

220

Rocky Flats Plant Site Environmental Report: 1993 Highlights  

Science Conference Proceedings (OSTI)

The Rocky Flats Plant Site Environmental Report provides summary information on the plant`s environmental monitoring programs and the results recorded during 1993. The report contains a compliance summary, results of environmental monitoring and other related programs, a review of environmental remediation activities, information on external gamma radiation dose monitoring, and radiation dose estimates for the surrounding population. This section provides an overview of these topics and summarizes more comprehensive discussions found in the main text of this annual report.

Not Available

1993-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Pantex Site - Reports  

NLE Websites -- All DOE Office Websites (Extended Search)

Reports Pantex Site Activity Reports 2013 Pantex Plant Operational Awareness Oversight, May 2013 Review Reports 2012 Assessment of Nuclear Safety Culture at the Pantex Plant,...

222

Pantex Plant | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

Locations > Pantex Plant Pantex Plant http:www.pantex.com Field Office: The NNSA Production Office is responsible for contract management and oversight of the Pantex Plant in...

223

Geologic Investigation of a Potential Site for a Next-Generation Reactor Neutrino Oscillation Experiment -- Diablo Canyon, San Luis Obispo County, CA  

E-Print Network (OSTI)

reactions of a nuclear power plant. Diablo Canyon wasmeters from the nuclear power plant) while having suitableThe Diablo Canyon Nuclear Power Plant site in San Luis

Onishi, Celia Tiemi; Dobson, Patrick; Nakagawa, Seiji; Glaser, Steven; Galic, Dom

2004-01-01T23:59:59.000Z

224

National Nuclear Security Administration Pantex Site Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pantex Site Office Pantex Site Office P. 0. Box 30036 Amarillo, TX 79120 JAN 1 2 2011 MEMORANDUM FOR: KENNETH W. POWERS ASSOCIATE ADMINISTRATOR FOR STEVEN C. ERHART MANAGER FROM: SUBJECT: Submission of Annual National Environmental Policy Act (NEPA) Planning Summaries for Fiscal Year 20 1 1 Please reference your memorandum dated December 17,2010, subject as above. Attached are the Pantex Site Ofice (PXSO) Annual NEPA Planning Summaries. All PXSO NEPA documentation expected in the near future or already under development is listed in these forms. This information is being disseminated through the Pantex Website at www.pantex.com and will be made available to the public in area Department of Energy Information Repositories. The PXSO does not anticipate preparing any Environmental Assessments within the next 12 months or

225

Inspection of Nuclear Power Plant Containment Structures  

SciTech Connect

Safety-related nuclear power plant (NPP) structures are designed to withstand loadings from a number of low-probability external and interval events, such as earthquakes, tornadoes, and loss-of-coolant accidents. Loadings incurred during normal plant operation therefore generally are not significant enough to cause appreciable degradation. However, these structures are susceptible to aging by various processes depending on the operating environment and service conditions. The effects of these processes may accumulate within these structures over time to cause failure under design conditions, or lead to costly repair. In the late 1980s and early 1990s several occurrences of degradation of NPP structures were discovered at various facilities (e.g., corrosion of pressure boundary components, freeze- thaw damage of concrete, and larger than anticipated loss of prestressing force). Despite these degradation occurrences and a trend for an increasing rate of occurrence, in-service inspection of the safety-related structures continued to be performed in a somewhat cursory manner. Starting in 1991, the U.S. Nuclear Regulatory Commission (USNRC) published the first of several new requirements to help ensure that adequate in-service inspection of these structures is performed. Current regulatory in-service inspection requirements are reviewed and a summary of degradation experience presented. Nondestructive examination techniques commonly used to inspect the NPP steel and concrete structures to identify and quantify the amount of damage present are reviewed. Finally, areas where nondestructive evaluation techniques require development (i.e., inaccessible portions of the containment pressure boundary, and thick heavily reinforced concrete sections are discussed.

Graves, H.L.; Naus, D.J.; Norris, W.E.

1998-12-01T23:59:59.000Z

226

Next Generation Nuclear Plant GAP Analysis Report  

DOE Green Energy (OSTI)

As a follow-up to the phenomena identification and ranking table (PIRT) studies conducted recently by NRC on next generation nuclear plant (NGNP) safety, a study was conducted to identify the significant 'gaps' between what is needed and what is already available to adequately assess NGNP safety characteristics. The PIRT studies focused on identifying important phenomena affecting NGNP plant behavior, while the gap study gives more attention to off-normal behavior, uncertainties, and event probabilities under both normal operation and postulated accident conditions. Hence, this process also involved incorporating more detailed evaluations of accident sequences and risk assessments. This study considers thermal-fluid and neutronic behavior under both normal and postulated accident conditions, fission product transport (FPT), high-temperature metals, and graphite behavior and their effects on safety. In addition, safety issues related to coupling process heat (hydrogen production) systems to the reactor are addressed, given the limited design information currently available. Recommendations for further study, including analytical methods development and experimental needs, are presented as appropriate in each of these areas.

Ball, Sydney J [ORNL; Burchell, Timothy D [ORNL; Corwin, William R [ORNL; Fisher, Stephen Eugene [ORNL; Forsberg, Charles W. [Massachusetts Institute of Technology (MIT); Morris, Robert Noel [ORNL; Moses, David Lewis [ORNL

2008-12-01T23:59:59.000Z

227

Site Index: Nuclear Engineering Division (Argonne National Laboratory)  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Index Site Index Welcome Organization Visit Argonne Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Celebrating the 70th Anniversary of Chicago Pile 1 (CP-1) Argonne OutLoud on Nuclear Energy Argonne Energy Showcase 2012 Bookmark and Share Site Index A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z A go to top About NE, see also Welcome from the Director Achievements Contact us Highlights Organization Visiting Argonne Welcome from the Director Working with Argonne Achievements, List of - Awards Patents Argonne Distinguished Fellows Professional Societies Nuclear Reactors designed by Argonne National Laboratory Advanced Reactor Development Aerosol Lab (facilities) ANL/NDM Reports (Nuclear Data and Measurements Series Reports and Related Material)

228

EA-1178: 300 Area Steam Plant Replacement, Hanford Site, Richland,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

78: 300 Area Steam Plant Replacement, Hanford Site, Richland, 78: 300 Area Steam Plant Replacement, Hanford Site, Richland, Washington EA-1178: 300 Area Steam Plant Replacement, Hanford Site, Richland, Washington SUMMARY This EA evaluates the environmental impacts for a proposed energy conservation measure for a number of buildings in the 300 Area of the U.S. Department of Energy Hanford Site. The proposed action includes replacing the centralized heating system with heating units for individual buildings or groups of buildings, constructing new natural gas pipelines to provide a source for many of these units and constructing a central control building to operate and maintain the system. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD March 12, 1997 EA-1178: Finding of No Significant Impact

229

Methodology and criteria for siting energy plants in Idaho  

DOE Green Energy (OSTI)

This study contains a review of energy plant siting criteria, methodologies, guidelines and programs that are being considered today in this country. A preliminary screening approach for siting energy plants in Idaho is presented and a detailed hierarchical classification system for siting criteria has been developed. Methodology for using the criteria is suggested. Experience of a workshop trying to identify problems of implementing a ranking and rating for siting energy plants in the general situation for Idaho is reported. A brief analysis is presented on the needs for regulations and legislation to implement a future program of evaluation that would benefit utilities, the planning agencies, and the regulatory agencies operating within the state of Idaho.

Warnick, C.C.

1976-01-01T23:59:59.000Z

230

Nuclear Power Plant Fire-Modeling Applications Guide  

Science Conference Proceedings (OSTI)

This report replaces EPRI 1002981, Fire Modeling Guide for Nuclear Power Plant Applications, August 2002, as guidance for fire-modeling practitioners in nuclear power plants (NPPs). The report has benefited from insights gained since 2002 on the predictive capability of selected fire models to improve confidence in the use of fire modeling in NPP decision-making.

2009-12-22T23:59:59.000Z

231

Welding and Fabrication Critical Factors for New Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Welding and fabrication processes employed for manufacture of critical nuclear power plant components may adversely affect material performance and can potentially increase susceptibility to known degradation mechanisms. This report identifies important welding and fabrication processes for specific materials, assesses their effects on potential degradation mechanisms, and identifies process enhancements that can improve long-term asset management of new nuclear plant components.

2009-12-08T23:59:59.000Z

232

Review of Polyimide Insulated Wire in Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Because of its toughness and other desirable properties, Kapton insulated wire has been test-qualified for use in nuclear power plants; however, failures of this material in military aircraft have raised safety questions. This report identifies the conditions of proper use and handling that will ensure reliable functioning of the wire under nuclear plant operating and accident conditions.

1991-03-01T23:59:59.000Z

233

Nuclear power plants undergo seasonal scheduled outages - Today in ...  

U.S. Energy Information Administration (EIA)

Uranium fuel, nuclear reactors, generation, spent fuel. Total Energy. ... Privacy/Security Copyright & Reuse Accessibility. Related Sites U.S. Department of Energy

234

Identifying Potential Areas for Siting Interim Nuclear Waste Facilities Using Map Algebra and Optimization Approaches  

Science Conference Proceedings (OSTI)

The renewed interest in siting new nuclear power plants in the United States has brought to the center stage, the need to site interim facilities for long-term management of spent nuclear fuel (SNF). In this paper, a two-stage approach for identifying potential areas for siting interim SNF facilities is presented. In the first stage, the land area is discretized into grids of uniform size (e.g., 100m x 100m grids). For the continental United States, this process resulted in a data matrix of about 700 million cells. Each cell of the matrix is then characterized as a binary decision variable to indicate whether an exclusion criterion is satisfied or not. A binary data matrix is created for each of the 25 siting criteria considered in this study. Using map algebra approach, cells that satisfy all criteria are clustered and regarded as potential siting areas. In the second stage, an optimization problem is formulated as a p-median problem on a rail network such that the sum of the shortest distance between nuclear power plants with SNF and the potential storage sites from the first stage is minimized. The implications of obtained results for energy policies are presented and discussed.

Omitaomu, Olufemi A [ORNL; Liu, Cheng [ORNL; Cetiner, Mustafa Sacit [ORNL; Belles, Randy [ORNL; Mays, Gary T [ORNL; Tuttle, Mark A [ORNL

2013-01-01T23:59:59.000Z

235

Program Change Management During Nuclear Power Plant Decommissioning  

Science Conference Proceedings (OSTI)

Decommissioning a nuclear power plant is a complex project, which involves the coordination of several different departments and the management of changing plant conditions, programs, and regulations. As plants meet certain project Milestones, the evolution of such plant programs and regulations can help optimize project execution and cost. This report provides information about these Milestones and the plant departments and programs that change throughout a decommissioning project.

2009-12-11T23:59:59.000Z

236

Guidelines for Nuclear Plant Response to an Earthquake  

Science Conference Proceedings (OSTI)

Guidelines for nuclear plant response to earthquakes enable utilities to evaluate in a timely manner the need for post-earthquake plant shutdown and to provide procedures for evaluation of earthquake effects on the plant, as well as criteria for plant restart. The procedures enable the responding team of operators and engineers to identify and assess any earthquake effects and, if shutdown is necessary, to return the plant to safe operation as rapidly as possible. The guidelines presented herein ...

2013-10-15T23:59:59.000Z

237

Guidelines for Nuclear Plant Response to an Earthquake  

Science Conference Proceedings (OSTI)

Guidelines for nuclear plant response to earthquakes enable utilities to evaluate in a timely manner the need for post-earthquake plant shutdown and to provide procedures for evaluation of earthquake effects on the plant, as well as criteria for plant restart. The procedures enable the responding team of operators and engineers to identify and assess any earthquake effects and, if shutdown is necessary, to return the plant to safe operation as rapidly as possible. The guidelines presented herein ...

2012-10-11T23:59:59.000Z

238

Some aspects of the decommissioning of nuclear power plants  

SciTech Connect

The major factors influencing the choice of a national concept for the decommissioning of nuclear power plants are examined. The operating lifetimes of power generating units with nuclear reactors of various types (VVER-1000, VVER-440, RBMK-1000, EGP-6, and BN-600) are analyzed. The basic approaches to decommissioning Russian nuclear power plants and the treatment of radioactive waste and spent nuclear fuel are discussed. Major aspects of the ecological and radiation safety of personnel, surrounding populations, and the environment during decommissioning of nuclear installations are identified.

Khvostova, M. S., E-mail: marinakhvostova@list.ru [St. Petersburg State Maritime Technical University (Sevmashvtuz), Severodvinsk Branch (Russian Federation)

2012-03-15T23:59:59.000Z

239

Financial and ratepayer impacts of nuclear power plant regulatory reform  

SciTech Connect

Three reports - ''The Future Market for Electric Generating Capacity,'' ''Quantitative Analysis of Nuclear Power Plant Licensing Reform,'' and ''Nuclear Rate Increase Study'' are recent studies performed by the Los Alamos National Laboratory that deal with nuclear power. This presents a short summary of these three studies. More detail is given in the reports.

Turpin, A.G.

1985-01-01T23:59:59.000Z

240

Feasibility Study of Hydrogen Production at Existing Nuclear Power Plants |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Feasibility Study of Hydrogen Production at Existing Nuclear Power Feasibility Study of Hydrogen Production at Existing Nuclear Power Plants Feasibility Study of Hydrogen Production at Existing Nuclear Power Plants A funding opportunity announcement of the cost shared feasibility studies of nuclear energy based production of hydrogen using available technology. The objective of this activity is to select and conduct project(s) that will utilize hydrogen production equipment and nuclear energy as necessary to produce data and analysis on the economics of hydrogen production with nuclear energy. Feasibility Study of Hydrogen Production at Existing Nuclear Power Plants More Documents & Publications https://e-center.doe.gov/iips/faopor.nsf/UNID/E67E46185A67EBE68 Microsoft Word - FOA cover sheet.doc Microsoft Word - hDE-FOA-0000092.rtf

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Waste Isolation Pilot Plant Annual Site Enviromental Report for 2008  

SciTech Connect

The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2008 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to characterize site environmental management performance; summarize environmental occurrences and responses reported during the calendar year; confirm compliance with environmental standards and requirements; highlight significant facility programs and efforts; and describe how compliance and environmental improvement is accomplished through the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the Waste Isolation Pilot Plant (WIPP). DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit (HWFP) Number NM4890139088-TSDF (treatment, storage, and disposal facility) further requires that the ASER be provided to the New Mexico Environment Department (NMED). The WIPP mission is to safely dispose of transuranic (TRU) radioactive waste generated by the production of nuclear weapons and other activities related to the national defense of the United States. In 2008, 5,265 cubic meters (m3) of TRU waste were disposed of at the WIPP facility, including 5,216 m3 of contact-handled (CH) TRU waste and 49 m3 of remote-handled (RH) TRU waste. From the first receipt of waste in March 1999 through the end of 2008, 57,873 m3 of TRU waste had been disposed of at the WIPP facility.

Washington Regulatory and Enviromnetal Services

2009-09-21T23:59:59.000Z

242

Nuclear Material Processing at the Savannah River Site  

Science Conference Proceedings (OSTI)

Plutonium production for national defense began at Savannah River in the mid-1950s, following construction of production reactors and separations facilities. Following the successful completion of its production mission, the site`s nuclear material processing facilities continue to operate to perform stabilization of excess materials and potentially support the disposition of these materials. A number of restoration and productivity improvement projects implemented in the 1980s, totaling nearly a billion dollars, have resulted in these facilities representing the most modern and only remaining operating large-scale processing facilities in the DOE Complex. Together with the Site`s extensive nuclear infrastructure, and integrated waste management system, SRS is the only DOE site with the capability and mission of ongoing processing operations.

Severynse, T.F. [Westinghouse Savannah River Company, AIKEN, SC (United States)

1998-07-01T23:59:59.000Z

243

A Dynamical Systems Model for Nuclear Power Plant Risk Management  

Science Conference Proceedings (OSTI)

This report provides a mathematical dynamical systems model of the effect of plant processes and programs on nuclear plant safety. That is, it models the safety risk management process. Responses of this model to postulated changes in performance and coupling parameters were verified to be in accordance with experience from years of commercial nuclear power plant operation. A preliminary analysis of the model was performed using the techniques of dynamical systems theory to determine regions of operation...

2003-10-31T23:59:59.000Z

244

Tenth Nuclear Plant Performance Improvement (NPPI) Seminar Proceedings  

Science Conference Proceedings (OSTI)

This report contains information presented at the Tenth Nuclear Plant Performance Improvement (NPPI) Seminar held July 15-16, 2002, in Saratoga Springs, New York. The biannual seminar -- sponsored by EPRI Plant Support Engineering (PSE), EPRI Plant Performance Enhancement Program (P2EP), and Rochester Gas and Electric -- provided an opportunity for participants to exchange technical information and experience regarding the achievement of the highest possible megawatt electric (MWe) output from nuclear po...

2002-08-15T23:59:59.000Z

245

Nuclear Power Plant Emergency Diesel Generator Tanks 1  

E-Print Network (OSTI)

Nuclear power provides about 20 % of the total electricity generated in the United States. In 2005, this was about 782 Billion kWh of the total electricity generation (EIA 2006). 2 As with fossil-fueled electricity generating plants, electricity in a nuclear power plant is produced by heated steam that drives a turbine generator. In a nuclear power plant, however, nuclear fission reactions in the core produce heat that is absorbed by a liquid that flows through the system and is converted to steam. Nuclear power plants are highly efficient and have become more so over the last 25 years. Operational efficiency (also referred to as plant performance or electricity production) can be measured by the capacity factor. The capacity factor is the ratio of the actual amount of electricity generated to the maximum possible amount that could be generated in a given period of time – usually a year. Today, nuclear power plants operate at an average 90 % capacity factor (compared to 56 % in 1980) (EIA 2006a). Thus, although nuclear generating capacity has remained roughly constant since 1990, at about 99 gigawatts (or about 10 % of the total U.S. electric generating capacity), the amount of electricity produced has increased 33 % since that time because of increased capacity utilization. Nuclear plants have the highest capacity factors of

unknown authors

2006-01-01T23:59:59.000Z

246

Advanced Nuclear Technology: Equipment Reliability for New Nuclear Plants: Industry Recommendations for Design  

Science Conference Proceedings (OSTI)

The initial and continued good operating performance of the current build of new nuclear plants is critical to the rebirth of the nuclear option in many countries. Good initial and continued performance is vital to the companies making the large investments required for new nuclear plants. One of the foundations of good performance is a sound process for establishing and sustaining plant equipment reliability (ER).

2010-08-26T23:59:59.000Z

247

License Stewardship Approach to Commercial Nuclear Power Plant Decommissioning  

SciTech Connect

The paper explores both the conceptual approach to decommissioning commercial nuclear facilities using a license stewardship approach as well as the first commercial application of this approach. The license stewardship approach involves a decommissioning company taking control of a site and the 10 CFR 50 License in order to complete the work utilizing the established trust fund. In conclusion: The license stewardship approach is a novel way to approach the decommissioning of a retired nuclear power plant that offers several key advantages to all parties. For the owner and regulators, it provides assurance that the station will be decommissioned in a safe, timely manner. Ratepayers are assured that the work will be completed for the price they already have paid, with the decommissioning contractor assuming the financial risk of decommissioning. The contractor gains control of the assets and liabilities, the license, and the decommissioning fund. This enables the decommissioning contractor to control their work and eliminates redundant layers of management, while bringing more focus on achieving the desired end state - a restored site. (authors)

Daly, P.T.; Hlopak, W.J. [Commercial Services Group, EnergySolutions 1009 Commerce Park, Oak Ridge, TN (United States)

2008-07-01T23:59:59.000Z

248

Estimation of Carbon-14 in Nuclear Power Plant Gaseous Effluents  

Science Conference Proceedings (OSTI)

Nuclear power plants report the amount of radioactivity released through permitted effluent pathways in their plant annual reports. This report provides users with a method for calculating the amount of carbon-14 (14C) generated in a light water reactor (LWR) core and released through plant gaseous effluent pathways.

2010-12-21T23:59:59.000Z

249

Plant Engineering: Advanced Nuclear Plant Cable System Design and Installation Concepts to Assure Longevity  

Science Conference Proceedings (OSTI)

Although the electrical cable systems for existing nuclear power plants have functioned well for up to 40 years, the desired service life for new plants is 60 or more years. Experience with existing plants indicates that relatively small changes during the design and construction of nuclear plants will lead to longer cable system lives and greater ease of testing and assessment of cables to verify their remaining service life. This report describes those changes and provides recommendations for their imp...

2012-04-16T23:59:59.000Z

250

Idaho Site Achieves Successful Nuclear Shipment on Newly Constructed Haul  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Achieves Successful Nuclear Shipment on Newly Achieves Successful Nuclear Shipment on Newly Constructed Haul Road Idaho Site Achieves Successful Nuclear Shipment on Newly Constructed Haul Road May 1, 2012 - 12:00pm Addthis The HFEF-6 cask is transported on the haul road. The HFEF-6 cask is transported on the haul road. IDAHO FALLS, Idaho - Close coordination among operations, security and transportation teams at the Idaho site helped ensure the recent success of the first nuclear shipment on a newly constructed haul road. The new road located between the Critical Infrastructure Test Range Complex (CITRC) and the Materials and Fuels Complex (MFC) is expected to help save significant time and cost over the life of the project by avoiding traffic disruptions on the public highway and increased cost associated with

251

National Nuclear Security Administration Pantex Site Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

JAN 2 7 2012 JAN 2 7 2012 MEMORANDUM FOR: TIMOTHY G. LYNCH ACTING GENERAL COUNSEL FROM: STEVEN C. ERHART MANAGER SUBJECT: Submission of Annual National Environmental Policy Act (NEPA) Planning Summaries for Fiscal Year 2012 Attached are the Pantex Site Office (PXSO) Annual NEPA Planning Summaries. All PXSO NEPA documentation expected in the near future or already under development is listed in these forms. This information is being disseminated through the Pantex Website at www.pantex.com and will be made available to the public in area Department of Energy Information Repositories. PXSO does not anticipate preparing any Environmental Assessments within the next 12 months or any Environmental Impact Statements within the next 24 months. We have begun preparing a new

252

National Nuclear Security Administration Pantex Site Office  

NLE Websites -- All DOE Office Websites (Extended Search)

JAN 22 2010 MEMORANDUM FOR: J. Brian Bidwell, Prime Contract Manager, Babcock & Wilcox Technical Services Pantex, LLC / / / FROM: Seb M. Klein, Contracting Officer, Pantex Site Offic ~ SUBJECT: Contract No. DE-AC04-00AL66620, Contract Modification No. M193 to B& W Pantex Contract Enclosed for your retention is an executed copy of the subject modification. This modification revises Part II, Section I - Contract Clauses, Part III Section J, Appendix A - Definitions, Part I - Compensation System, Part II - Benefits Program, Part IV Miscellaneous Human Resources Programs, incorporates Reimbursement Authorizations Thirty (30) Thirty One (31 ) Thirty Two (32), previously approved by a Contracting Officer, replace Appendix E - "List of Applicable Directives," with as of

253

Idaho Site Obtains Patent for Nuclear Reactor Sodium Cleanup Treatment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Obtains Patent for Nuclear Reactor Sodium Cleanup Obtains Patent for Nuclear Reactor Sodium Cleanup Treatment Idaho Site Obtains Patent for Nuclear Reactor Sodium Cleanup Treatment March 28, 2013 - 12:00pm Addthis CWI engineers Jeff Jones, David Tolman, right, and Kirk Dooley (seated) developed a treatment to safely dissolve a bicarbonate crust and treat and remove the sodium in the Experimental Breeder Reactor-II at the Idaho site. CWI engineers Jeff Jones, David Tolman, right, and Kirk Dooley (seated) developed a treatment to safely dissolve a bicarbonate crust and treat and remove the sodium in the Experimental Breeder Reactor-II at the Idaho site. Piping in the east boiler basement of the sodium processing building was color coded for easy identification. Orange indicates sodium and green identifies cooling water.

254

Plan for addressing issues relating to oil shale plant siting  

SciTech Connect

The Western Research Institute plan for addressing oil shale plant siting methodology calls for identifying the available resources such as oil shale, water, topography and transportation, and human resources. Restrictions on development are addressed: land ownership, land use, water rights, environment, socioeconomics, culture, health and safety, and other institutional restrictions. Descriptions of the technologies for development of oil shale resources are included. The impacts of oil shale development on the environment, socioeconomic structure, water availability, and other conditions are discussed. Finally, the Western Research Institute plan proposes to integrate these topics to develop a flow chart for oil shale plant siting. Western Research Institute has (1) identified relative topics for shale oil plant siting, (2) surveyed both published and unpublished information, and (3) identified data gaps and research needs. 910 refs., 3 figs., 30 tabs.

Noridin, J.S.; Donovan, R.; Trudell, L.; Dean, J.; Blevins, A.; Harrington, L.W.; James, R.; Berdan, G.

1987-09-01T23:59:59.000Z

255

Portsmouth Gaseous Diffusion Plant annual site environmental report for 1993  

Science Conference Proceedings (OSTI)

This calendar year (CY) 1993 annual report on environmental monitoring of the US Department of Energy`s (DOE`s) Portsmouth Gaseous Diffusion Plant (Portsmouth) and its environs consists of three separate documents: a summary pamphlet for the general public; a more detail discussion and of compliance status, data, and environmental impacts (this document); and a volume of detailed data that is available on request. The objectives of this report are to report compliance status during 1993; provide information about the plant site and plant operations; report 1993 monitoring data for the installation and its environs that may have been affected by operations on the plant site; document information on input and assumptions used in calculations; provide trend analyses (where appropriate) to indicate increases and decreases in environmental impact, and provide general information on quality assurance for the environmental monitoring program.

Horak, C.M. [ed.

1994-11-01T23:59:59.000Z

256

Risk analysis and solving the nuclear waste siting problem  

SciTech Connect

In spite of millions of dollars and countless human resources being expended on finding nuclear wastes sites, the search has proved extremely difficult for the nuclear industry. This may be due to the approach followed, rather than inadequacies in research or funding. A new approach to the problem, the reverse Dutch auction, is suggested. It retains some of the useful elements of the present system, but it also adds new ones.

Inhaber, H.

1993-12-01T23:59:59.000Z

257

DNAPL Site Characterization for Waste Management at Manufactured Gas Plant (MGP) Sites  

Science Conference Proceedings (OSTI)

Determining the optimal waste management strategy at manufactured gas plant (MGP) sites requires adequate site characterization to provide data for remediation decisions, a task that is particularly challenging when dense nonaqueous phase liquids (DNAPLs) are present. This report discusses development of an appropriate characterization strategy, including parameters that should be characterized, tools for characterization and the relation between characterization goals, a developing site conceptual model...

2004-12-22T23:59:59.000Z

258

Lesson 7 - Waste from Nuclear Power Plants | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7 - Waste from Nuclear Power Plants 7 - Waste from Nuclear Power Plants Lesson 7 - Waste from Nuclear Power Plants This lesson takes a look at the waste from electricity production at nuclear power plants. It considers the different types of waste generated, as well as how we deal with each type of waste. Specific topics covered include: Nuclear Waste Some radioactive Types of radioactive waste Low-level waste High-level waste Disposal and storage Low-level waste disposal Spent fuel storage Waste isolation Reprocessing Decommissioning Lesson 7 - Waste.pptx More Documents & Publications National Report Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management Third National Report for the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management

259

Guidance for Deployment of Mobile Technologies for Nuclear Power Plant  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance for Deployment of Mobile Technologies for Nuclear Power Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers Guidance for Deployment of Mobile Technologies for Nuclear Power Plant Field Workers This report is a guidance document prepared for the benefit of commercial nuclear power plants' (NPPs) supporting organizations and personnel who are considering or undertaking deployment of mobile technology for the purpose of improving human performance and plant status control (PSC) for field workers in an NPP setting. This document especially is directed at NPP business managers, Electric Power Research Institute, Institute of Nuclear Power Operations, and other non-Information Technology personnel. This information is not intended to replace basic project management practices or reiterate these processes, but is to support decision-making,

260

Guide to Assessing Radiological Elements for License Termination of Nuclear Power Plants  

Science Conference Proceedings (OSTI)

This report provides guidance in the preparation of a License Termination Plan (LTP) to utilities engaged in nuclear plant decommissioning. The U.S. Nuclear Regulatory Commission (NRC) requires utilities to submit the LTP document years prior to the site license termination. This report focuses on the radiological components of the LTP. It identifies and addresses the regulatory requirements of each element in a way useful to the utility end user.

2002-06-12T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Coordination of EPRI Risk Ranking Methodologies for Nuclear Power Plant Groundwater Protection & Underground Piping Programs  

Science Conference Proceedings (OSTI)

The nuclear power industry committed to the Groundwater Protection Initiative (GPI) and the Underground Piping and Tanks Initiative (UPTI) to improve the management of soil and groundwater contamination, and the management of underground piping and tanks. These two Initiatives, while they have different objectives, are closely aligned in the area of preventing leaks and spills of licensed materials. The results of this Electric Power Research Institute (EPRI) work will provide nuclear power plant sites w...

2011-12-14T23:59:59.000Z

262

SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT  

E-Print Network (OSTI)

Generating Plant. The enclosed report documents the inspection findings which were discussed on February 22, 2001, with you and other members of your staff. This inspection examined activities conducted under your license as they relate to safety and compliance with the Commission’s rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, the inspectors identified two issues of very low safety significance (Green). One of these issues was determined to involve a violation of NRC requirements. However, because of its very low safety significance and because it has been entered into your corrective action program, the NRC is treating the issue as a non-cited violation, in accordance with Section VI.A.1 of the NRC’s Enforcement Policy. If you deny the non-cited violation, you should provide a response with the basis for your denial, within 30 days of the date of this inspection report, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator,

Dear Mr. Sorensen; Roger D. Lanksbury

2001-01-01T23:59:59.000Z

263

Mesoscale to plant-scale models of nuclear waste reprocessing.  

Science Conference Proceedings (OSTI)

Imported oil exacerabates our trade deficit and funds anti-American regimes. Nuclear Energy (NE) is a demonstrated technology with high efficiency. NE's two biggest political detriments are possible accidents and nuclear waste disposal. For NE policy, proliferation is the biggest obstacle. Nuclear waste can be reduced through reprocessing, where fuel rods are separated into various streams, some of which can be reused in reactors. Current process developed in the 1950s is dirty and expensive, U/Pu separation is the most critical. Fuel rods are sheared and dissolved in acid to extract fissile material in a centrifugal contactor. Plants have many contacts in series with other separations. We have taken a science and simulation-based approach to develop a modern reprocessing plant. Models of reprocessing plants are needed to support nuclear materials accountancy, nonproliferation, plant design, and plant scale-up.

Noble, David Frederick; O'Hern, Timothy John; Moffat, Harry K.; Nemer, Martin B.; Domino, Stefan Paul; Rao, Rekha Ranjana; Cipiti, Benjamin B.; Brotherton, Christopher M.; Jove-Colon, Carlos F.; Pawlowski, Roger Patrick

2010-09-01T23:59:59.000Z

264

Industry Participation Sought for Design of Next Generation Nuclear Plant |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Industry Participation Sought for Design of Next Generation Nuclear Industry Participation Sought for Design of Next Generation Nuclear Plant Industry Participation Sought for Design of Next Generation Nuclear Plant June 29, 2006 - 2:41pm Addthis Gen IV Reactor Capable of Producing Electricity and/or Hydrogen WASHINGTON, DC - The U.S. Department of Energy (DOE) is seeking expressions of interest from prospective industry teams interested in participating in the development and conceptual design for the Next Generation Nuclear Plant (NGNP), a very high temperature gas-cooled nuclear reactor prototype with the capability to produce process heat, electricity and/or hydrogen. The very high temperature reactor is based on research and development activities supported by DOE's Generation IV nuclear energy systems initiative.

265

Sediment Capping Resource Guide for Manufactured Gas Plant Sites  

Science Conference Proceedings (OSTI)

This report describes tools and techniques applicable to design and implementation of sediment capping remedies at former manufactured gas plant (MGP) sites. It includes a number of practical case studies describing cap designs and cap construction experience. The report is intended as a sediment capping resource guide to be used with EPRI's 2007 Handbook of Remedial Alternatives for MGP Sites with Contaminated Sediments (EPRI report 1012592).

2008-11-18T23:59:59.000Z

266

Solvent Extraction for Remediation of Manufactured Gas Plant Sites  

Science Conference Proceedings (OSTI)

EPRI has assessed the feasibility of using a solvent extraction process to remove coal tar from the subsurface or to treat contaminated soil excavated from manufactured gas plant (MGP) sites. The assessment indicates that in situ solvent extraction may recover a significant amount of tar from the subsurface within a reasonable timeframe, provided subsurface conditions are conducive to process implementation. This work will help utilities searching for cost-effective technologies to remediate MGP sites.

1993-02-18T23:59:59.000Z

267

Use of In-Situ Gamma Spectroscopy During Nuclear Power Plant Decommissioning  

Science Conference Proceedings (OSTI)

Due to leakage and other events that may occur during nuclear power plant operations, soil, concrete and bedrock have the potential to become contaminated, and therefore must be characterized to demonstrate that they meet strict regulatory site release limits. This report provides detailed information on the use of portable gamma spectroscopy systems for the characterization and Final Status Survey of soil, concrete and bedrock contaminated with radionuclides at a number of plants undergoing decommission...

2010-12-06T23:59:59.000Z

268

Evaluation of Seismic Hazards at Central and Eastern U.S. Nuclear Power Sites  

Science Conference Proceedings (OSTI)

Interest in recent years in early site permits (ESPs) for new nuclear plants has prompted a reevaluation of seismic design criteria and a reexamination of the basis for current criteria. Currently, Regulatory Guide 1.208 bases seismic design requirements on probabilistic seismic hazard analyses (PSHAs), using results published in 1989 and 1994. Since then, much new work has been undertaken to better understand earthquakes in the Central and Eastern United States (CEUS) and the associated strong ground mo...

2011-06-30T23:59:59.000Z

269

Disposition Options for Hanford Site K-Basin Spent Nuclear Fuel Sludge  

SciTech Connect

This report provides summary-level information about a group of options that have been identified for the disposition of spent-nuclear-fuel sludge in the K-Basins at the Hanford Site. These options are representative of the range of likely candidates that may be considered for disposition of the sludge. The product of each treatment option would be treated sludge that would meet waste acceptance requirements for disposal as transuranic (TRU) waste at the Waste Isolation Pilot Plant (WIPP).

Mellinger, George B.; Delegard, Calvin H.; Gerber, Mark A.; Naft, Barry N.; Schmidt, Andrew J.; Walton, Terry L.

2004-01-18T23:59:59.000Z

270

Loss of benefits resulting from mandated nuclear plant shutdowns  

SciTech Connect

This paper identifies and discusses some of the important consequences of nuclear power plant unavailability, and quantifies a number of technical measures of loss of benefits that result from regulatory actions such as licensing delays and mandated nuclear plant outages. The loss of benefits that accompany such regulatory actions include increased costs of systems generation, increased demand for nonnuclear and often scarce fuels, and reduced system reliability. This paper is based on a series of case studies, supplemented by sensitivity studies, on hypothetical nuclear plant shutdowns. These studies were developed by Argonne in cooperation with four electric utilities.

Peerenboom, J.P.; Buehring, W.A.

1982-01-01T23:59:59.000Z

271

A Case Study on the Use of Innovative Methods for Comprehensive Site Characterization at Former Manufactured Gas Plant Sites  

Science Conference Proceedings (OSTI)

This report is a case study on using innovative technologies for investigating former manufactured gas plant sites.

2002-06-25T23:59:59.000Z

272

EM Celebrates Ribbon Cutting for New Biomass Plant at Savannah River Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Celebrates Ribbon Cutting for New Biomass Plant at Savannah Celebrates Ribbon Cutting for New Biomass Plant at Savannah River Site EM Celebrates Ribbon Cutting for New Biomass Plant at Savannah River Site March 1, 2012 - 12:00pm Addthis Pictured from left are Senior Advisor for Environmental Management David Huizenga; DOE Savannah River Operations Office Manager Dave Moody; SRNS Infrastructure Maintenance and Engineering Manager John Stafford; DOE Federal Projects Director Jim DeMass; Under Secretary for Nuclear Security Thomas D’Agostino; DOE-Savannah River Assistant Manager Karen Guevara; Ameresco Federal Programs Director Nicole Bulgarino; Ameresco Executive Vice President Keith Derrington; U.S. Rep. Joe Wilson (R-SC); Ameresco Program Manager Ken Chacey; and Ameresco President and CEO George Sakellaris.

273

Site-Specific Seismic Site Response Model for the Waste Treatment Plant, Hanford, Washington  

SciTech Connect

The seismic design basis for the Waste Treatment Plant (WTP) at the Department of Energy's Hanford Site near Richland, Washington, was established in 1999 based on an extensive probabilistic seismic hazard analysis completed in 1996 by Geomatrix Consultants, Inc. In subsequent years, the Defense Nuclear Facilities Safety Board (DNFSB) staff questioned the some of the assumptions used in developing the seismic design basis, particularly the adequacy of the site geotechnical surveys. Existing site-specific shear wave velocity data were considered insufficient to reliably use California earthquake response data to directly predict ground motions at the Hanford Site. To address this concern, the Department of Energy's Office of River Protection (ORP) and Pacific Northwest National Laboratory (PNNL) developed and executed a plan for acquiring site-specific soil data down to approximately 500 feet, and for reanalyzing the effects of deeper layers of sediments interbedded with basalt. New geophysical data were acquired, analyzed, and interpreted with respect to existing geologic information gathered from other Hanford-related projects in the WTP area. Existing data from deep boreholes were assembled and interpreted to produce a model of the deeper rock layers consisting of inter-layered basalts and sedimentary interbeds. These data were analyzed statistically to determine the variability of seismic velocities. The earthquake ground motion response was simulated on a large number of models resulting from a weighted logic tree approach that addressed the geologic and geophysical uncertainties. Weights in the logic tree were chosen by a working group based on the strength or weakness of the available data for each combination of logic tree parameters. Finally, interim design ground motion spectra were developed to envelope the remaining uncertainties. The results of this study demonstrate that the site-specific soil structure (Hanford and Ringold formations) beneath the WTP is thinner than was assumed in the 1996 Hanford Site-wide model. This thinness produces peaks in the response spectra (relative to those in 1996) near 2 Hz and 5 Hz. The soil geophysical properties, shear wave velocity, and nonlinear response to the earthquake ground motions are known sufficiently, and alternative interpretations consistent with this data did not have a strong influence on the results. The structure of the upper four basalt flows (Saddle Mountains Basalt), which are inter-layered with sedimentary interbeds (Ellensburg Formation), produces strong reductions in the earthquake ground motions that propagate through them to reach the surface. Uncertainty in the strength of velocity contrasts between these basalts and interbeds resulted from an absence of measured shear wave velocities (Vs) in the interbeds. For this study, Vs in the interbeds was estimated from older, limited compressional wave (Vp) data using estimated ranges for the ratio of the two velocities (Vp/Vs) based on analogues in similar materials. The Vs for the basalts, where Vp/Vs is well defined, still is limited by the quality and quantity of the Vp data. A range of possible Vs for the interbeds and basalts was included in the logic trees that produced additional uncertainty in the resulting response spectra. The uncertainties in these response spectra were enveloped at approximately the 84. percentile (based on the logic tree) to produce conservative design spectra. This conservatism increased the seismic design basis by up to 40% compared to the 1999 values. Because of the sensitivity of the calculated response spectra to the velocity contrasts between the basalts and interbedded sediments, additional boreholes and direct Vs measurements through these layers are now being planned. The new measurements are expected to reduce the uncertainty in the site response that is caused by the lack of direct knowledge of the Vs contrasts within these layers. (authors)

Rohay, A.C.; Reidel, S.P. [Pacific Northwest National Laboratory, P.O. Box 999, Richland, Washington 99352 (United States)

2006-07-01T23:59:59.000Z

274

Existing nuclear sites can be used for new powerplants and nuclear waste storage  

SciTech Connect

Locating future nuclear powerplants at existing sites offers important advantages which warrant consideration by the Nuclear Regulatory Commission. The number of locations committed to long-term restricted use and periodic surveillance and maintenance could be limited. The burden of long-term care and final disposition of retired nuclear powerplants could be eased. Overall environmental impacts from the construction and operation of the powerplants could be reduced. Time and money in completing licensing proceedings could be saved. GAO also found that low-level wastes can be stored at nuclear powerplant sites, but such storage only postpones the inevitable need for disposal. Finally, permanent waste disposal at powerplant sites should only be permitted when sites conform to the national low-level waste disposal plan being prepared by the Department of Energy.

Staats, E.B.

1980-04-01T23:59:59.000Z

275

New Jersey Nuclear Profile - Power Plants  

U.S. Energy Information Administration (EIA)

snpt2nj Oyster Creek Unit 1 615 4,601 14.0 Exelon Nuclear PSEG Hope Creek Generating Station Unit 1 1,161 9,439 28.8 PSEG Nuclear LLC PSEG Salem Generating Station

276

Use of Probabilistic Methods in Nuclear Power Plant Decommissioning Dose Analysis  

Science Conference Proceedings (OSTI)

This report provides guidance on the use of probabilistic dose analysis in the demonstration of regulatory compliance for final release of decommissioned nuclear plant sites. It also addresses probabilistic dose analysis and the interpretation of its results in general terms. Finally, the report examines the use of the RESRAD 6.0 as a tool for screening dose analysis and for site-specific probabilistic dose analysis.

2002-05-21T23:59:59.000Z

277

Review of Methods and Tools for Estimating Atmospheric Deposition of Tritium at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

As part of a groundwater protection program, nuclear power plant operators must understand the sources and concentrations of tritium in on-site groundwater. Low levels of tritium from gaseous effluents and evaporating liquid effluents held in on-site impoundments or ponds can impact the tritium concentration in groundwater through rain washout. This report reviews the methods and tools necessary to quantify the impact of such atmospherically deposited tritium in groundwater.

2009-12-08T23:59:59.000Z

278

Advanced Technologies for Groundwater Monitoring and Remediation at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

As part of the industry Groundwater Protection Initiative, EPRI has been investigating groundwater monitoring and remediation technologies that have potential for implementation at nuclear power plant sites. This report explores groundwater monitoring and remediation technologies under development or implemented at other industrial and U.S. Department of Energy sites, for both radionuclide and non-radionuclide contaminants. The report documents the potential for development of these technologies for impl...

2008-12-03T23:59:59.000Z

279

Idaho Site Taps Old World Process to Treat Nuclear Waste | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Site Taps Old World Process to Treat Nuclear Waste Idaho Site Taps Old World Process to Treat Nuclear Waste September 9, 2013 - 12:00pm Addthis The Idaho site's sodium...

280

A CCA-compliant nuclear power plant simulator kernel  

Science Conference Proceedings (OSTI)

This paper presents a parallel, component-oriented nuclear power plant simulator kernel. It is based on the high-performance computing oriented Common Component Architecture. The approach takes advantage of both the component paradigm and the parallel ...

Manuel Díaz; Daniel Garrido; Sergio Romero; Bartolomé Rubio; Enrique Soler; José M. Troya

2005-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Mapping complexity sources in nuclear power plant domains  

E-Print Network (OSTI)

Understanding the sources of complexity in advanced Nuclear Power Plant (NPP) control rooms and their effects on human reliability is critical for ensuring safe performance of both operators and the entire system. New ...

Sasangohar, Farzan

282

Expected brine movement at potential nuclear waste repository salt sites  

SciTech Connect

The BRINEMIG brine migration code predicts rates and quantities of brine migration to a waste package emplaced in a high-level nuclear waste repository in salt. The BRINEMIG code is an explicit time-marching finite-difference code that solves a mass balance equation and uses the Jenks equation to predict velocities of brine migration. Predictions were made for the seven potentially acceptable salt sites under consideration as locations for the first US high-level nuclear waste repository. Predicted total quantities of accumulated brine were on the order of 1 m/sup 3/ brine per waste package or less. Less brine accumulation is expected at domal salt sites because of the lower initial moisture contents relative to bedded salt sites. Less total accumulation of brine is predicted for spent fuel than for commercial high-level waste because of the lower temperatures generated by spent fuel. 11 refs., 36 figs., 29 tabs.

McCauley, V.S.; Raines, G.E.

1987-08-01T23:59:59.000Z

283

Training Module for Cyber Security in Nuclear Plant Digital Modifications  

Science Conference Proceedings (OSTI)

Nuclear power plants face increasing regulatory requirements from the U.S. Nuclear Regulatory Commission (NRC) and the Federal Energy Regulatory Commission (FERC) for cyber security of digital devices, components, and systems. The focus of these cyber security requirements is to protect plant digital computer systems, communications systems, and networks from cyber attacks that would affect reactor safety or generation reliability. This Electric Power Research Institute (EPRI) computer-based training mod...

2011-04-28T23:59:59.000Z

284

Related Sites, Experimental Resources for Nuclear Data Studies...  

NLE Websites -- All DOE Office Websites (Extended Search)

Nuclear Safety Materials Disposition Decontamination & Decommissioning Nuclear Criticality Safety Nuclear Data Program Nuclear Waste Form Modeling Departments Engineering...

285

Advanced Sensor Diagnostics in Nuclear Power Plant Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Sensor Diagnostics in Nuclear Power Plant Applications Sensor Diagnostics in Nuclear Power Plant Applications R.B. Vilim Argonne National Laboratory Sensor degradation occurs routinely during nuclear power plant operation and can contribute to reduced power production and less efficient plant operation. Mechanisms include drift of sensor electronics and mechanical components, fouling and erosion of flow meter orifice plates, and general degradation of thermocouples. One solution to this problem is the use of higher quality instrumentation and of physical redundancy. This, however, increases plant cost and does not address the degradation problem in a fundamental way. An alternative approach is to use signal processing algorithms to detect a degraded sensor and to construct a replacement value using an

286

An aerial radiological survey of the Pilgrim Station Nuclear Power Plant and surrounding area, Plymouth, Massachusetts  

SciTech Connect

Terrestrial radioactivity surrounding the Pilgrim Station Nuclear Power Plant was measured using aerial radiolog- ical survey techniques. The purpose of this survey was to document exposure rates near the plant and to identify unexpected, man-made radiation sources within the survey area. The surveyed area included land areas within a three-mile radius of the plant site. Data were acquired using an airborne detection system that employs sodium iodide, thallium-activated detectors. Exposure rate and photopeak counts were computed from these data and plotted on aerial photographs of the survey area. Several ground-based exposure measurements were made for comparison with the,aerial survey results. Exposure rates in areas surrounding the plant site varied from 6 to 10 microroentgens per hour, with exposure rates below 6 microroentgens per hour occurring over bogs and marshy areas. Man-made radiation was found to be higher than background levels at the plant site. Radation due to nitrogen-1 6, which is produced in the steam cycle of a boiling-water reactor, was the primaty source of activity found at the plant site. Cesium-137 activity at levels slightly above those expected from natural fallout was found at isolated locations inland from the plant site. No other detectable sources of man-made radioactivity were found.

Proctor, A.E.

1997-06-01T23:59:59.000Z

287

Y-12 PLANT NUCLEAR SAFETY HANDBOOK  

SciTech Connect

Information needed to solve nuclear safety problems is condensed into a reference book for use by persons familiar with the field. Included are a glossary of terms; useful tables; nuclear constants; criticality calculations; basic nuclear safety limits; solution geometries and critical values; metal critical values; criticality values for intermediate, heterogeneous, and interacting systems; miscellaneous and related information; and report number, author, and subject indexes. (C.H.)

Wachter, J.W. ed.; Bailey, M.L.; Cagle, T.J.; Mee, W.T.; Pletz, R.H.; Welfare, F.G.; Youngblood, B.J. comps

1963-03-27T23:59:59.000Z

288

Updated Site Response Analyses for the Waste Treatment Plant, DOE Hanford, Site, Washington.  

Science Conference Proceedings (OSTI)

This document describes the calculations performed to develop updated relative amplification functions for the Waste Treatment and Immobilization Plant (WTP) facility at the DOE Hanford Site, Washington State. The original 2,000-year return period design spectra for the WTP were based on the results of a probabilistic seismic hazard analysis (PSHA) performed for the DOE Hanford Site by Geomatrix (1996). Geomatrix (1996) performed the PSHA using empirical soil-site ground motion models based primarily on recordings from California. As part of that study, site response analyses were performed to evaluate ground motions at the Hanford sites and California deep soil sites. As described in Appendix A of Geomatrix (1996), characteristic site profiles and dynamic soil properties representative of conditions at various Hanford sites and California deep soil strong motion recording stations were defined. Relative site responses of the Hanford profiles and California profiles were then compared. Based on the results of those site response analyses, it was concluded that ground motions at the Hanford sites underlain by deep soil deposits are similar in character to those on California deep soil sites and it was judged appropriate to use empirical deep soil site attenuation relationships based primarily on California ground motion data to develop design spectra for the Hanford sites. In a subsequent analysis, Geomatrix (2003) updated the site response analyses of Geomatrix (1996, Appendix A) to incorporate randomization of the California and Hanford profiles. The results of that analysis also led to the conclusion that the response of the Hanford profiles was similar to the response of deep soil sites in California.

Youngs, Robert R.

2007-06-29T23:59:59.000Z

289

Assessment of Electromagnetic Interference Events in Nuclear Power Plants  

Science Conference Proceedings (OSTI)

This report presents a study and analysis of reported electromagnetic interference (EMI-) related incidents in nuclear power plants. These incidents were gathered primarily from the total body of incidents reported to the Institute of Nuclear Power Operations (INPO) database, with a few incidents coming from U.S. Nuclear Regulatory Commission (NRC) reports. This report analyzes trends and common factors in these events. The analysis is intended to inform the estimation of risk from EMI and offer suggesti...

2011-12-23T23:59:59.000Z

290

Technical considerations in repowering a nuclear plant for fossil fueled operation  

SciTech Connect

Repowering involves replacement of the reactor by a fossil fuel source of steam. This source can be a conventional fossil fueled boiler or the heat recovery steam generator (HRSG) on a gas turbine exhaust. The existing steam turbine plant is used to the extent possible. Alternative fuels for repowering a nuclear plant are coal, natural gas and oil. In today`s world oil is not usually an alternative. Selection of coal or natural gas is largely a matter of availability of the fuel near the location of the plant. Both the fossil boiler and the HRSG produce steam at higher pressures and temperatures than the throttle conditions for a saturated steam nuclear turbine. It is necessary to match the steam conditions from the new source to the existing turbine as closely as possible. Technical approaches to achieve a match range from using a topping turbine at the front end of the cycle to attemperation of the throttle steam with feedwater. The electrical output from the repowered plant is usually greater than that of the original nuclear fueled design. This requires consideration of the ability to use the excess electricity. Interfacing of the new facility with the existing turbine plant requires consideration of facility layout and design. Site factors must also be considered, especially for a coal fired boiler, since rail and coal handling facilities must be added to a site for which these were not considered. Additional site factors that require consideration are ash handling and disposal.

Patti, F.J.

1996-03-01T23:59:59.000Z

291

Qinshan: China`s first nuclear power plant  

SciTech Connect

Plant design, startup, and operation of the Qinshan-1 nuclear power plant in China are outlined in this article. Qinshan-1 is a 300 MW(e) pressurized water reactor designed and constructed in China. Approximately 70 percent of the equipment was also made in China. Findings of a preoperational safety inspection by the International Atomic Energy Agency are summarized.

NONE

1992-08-01T23:59:59.000Z

292

Life Expectancy of Motors in Mild Nuclear Plant Environments  

Science Conference Proceedings (OSTI)

Predicted life expectancies of commercial-grade motors used in the milder environments of nuclear power plants indicate that those motors can last for the life of the plant if properly maintained. This report details methods by which utilities can make such predictions and supplies the extensive data on which the analytic techniques are based.

1985-02-21T23:59:59.000Z

293

Data Mining for Monitoring Loose Parts in Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Monitoring the mechanical impact of a loose (detached or drifting) part in the reactor coolant system of a nuclear power plant is one of the essential functions for operation and maintenance of the plant.Large data tables are generated during this monitoring ...

J. W. Guan; David A. Bell

2000-10-01T23:59:59.000Z

294

Atmospheric Deposition of Tritium at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Tritium source terms at nuclear power plants consist of several sources that include plant vents and cooling impoundments, cooling towers, and treatment ponds. Cooling lakes and reservoirs can be sources of airborne tritium. Methods are presented for estimating these source terms and predicting resulting deposition of tritium using metrological models and for estimating infiltration of tritium using hydrogeological models.

2010-12-16T23:59:59.000Z

295

Groundwater Protection Guidelines for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The nuclear power industry has undertaken a Groundwater Protection Initiative at the Direction of the NEI Nuclear Strategic Issues Advisory Committee (NSIAC). This EPRI guideline provides essential technical guidance to utilities on the necessary elements of a sound groundwater protection program.

2007-11-27T23:59:59.000Z

296

RADIOLOGICAL HEALTH AND RELATED STANDARDS FOR NUCLEAR POWER PLANTS. VOLUME 2 OF HEALTH AND SAFETY IMPACTS OF NUCLEAR, GEOTHERMAL, AND FOSSIL-FUEL ELECTRIC GENERATION IN CALIFORNIA  

E-Print Network (OSTI)

U. S. Conunercial Nuclear Power Plants", Report WASH-1400 (for Light-Water Cooled Nuclear Power Plants to Assess PlantStandards for Nuclear Power Plants," by A.V. Nero and Y.C.

Nero, A.V.

2010-01-01T23:59:59.000Z

297

Calibration of Radiation Monitors at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Radiation monitors are installed in nuclear power plants to indicate to operators the levels of radioactivity in various processes and at specific plant locations. Plant personnel depend on radiation monitors for accurate and precise data in order to make informed decisions and take appropriate actions during normal, abnormal, and design basis events. As with all electronic measurement systems, error can be introduced by changing environmental conditions, aging components, and replaced parts. The radiati...

2005-12-22T23:59:59.000Z

298

Waste Isolation Pilot Plant Annual Site Environmental Report for 2012  

SciTech Connect

The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2012 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1B, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: Characterize site environmental management performance; Summarize environmental occurrences and responses reported during the calendar year; Confirm compliance with environmental standards and requirements; Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS).

None

2013-09-01T23:59:59.000Z

299

Use of expert systems in nuclear power plants  

SciTech Connect

The application of technologies, particularly expert systems, to the control room activities in a nuclear power plant has the potential to reduce operator error and increase plant safety, reliability, and efficiency. Furthermore, there are a large number of nonoperating activities (testing, routine maintenance, outage planning, equipment diagnostics, and fuel management) in which expert systems can increase the efficiency and effectiveness of overall plant and corporate operations. This document presents a number of potential applications of expert systems in the nuclear power field. 36 refs., 2 tabs.

Uhrig, R.E.

1989-01-01T23:59:59.000Z

300

100-MW NUCLEAR POWER PLANT UTILIZING A SODIUM COOLED, GRAPHITE MODERATED REACTOR  

SciTech Connect

The conceptual design of a 100 Mw(e) nuclear power plant is described. The plant utilized a sodium-cooled graphite-moderated reactor with stainless- steel clad. slightiy enriched UO/sub 2/ fuel. The reactor is provided with three main coolant circuits, and the steam cycle has three stages of regenerative heating. The plant control system allows automatic operation over the range of 20 to 100% load, or manual operation at all loads. The site, reactor, sodium systems, reactor auxiliaries, fuel handling, instrumentation, turbine-generator, buildings. and safety measures are described. Engineering drawings are included. (W.D.M.)

1958-02-28T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Chu Visits Site of America?s First New Nuclear Reactor in Three...  

NLE Websites -- All DOE Office Websites (Extended Search)

5, 2012 Chu Visits Site of Americas First New Nuclear Reactor in Three Decades Energy Secretary Announces New Nuclear Energy Research Grants and Next Steps on Used Fuel...

302

Nuclear plant owners move closer to life extension  

Science Conference Proceedings (OSTI)

A major debate is now underway about the safety of 40-year-old nuclear power plants. Under the Atomic Energy Act of 1954 a nuclear power plant's license is limited to a maximum of 40 years. Although the act permits the renewal of an operating license, it does not outline any standards or procedures for determining when or under what conditions a plant's operating license should be renewed. This paper reports that the Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) are co-sponsors of a program to demonstrate the license renewal process for two nuclear power plants - Yankee Atomic Electric's 175-MW Yankee PWR plant and Northern States Power's 536-MW Monticello BWR plant. The demonstration is known as the lead plant project. Yankee Atomic has already analyzed the plant's condition and evaluated aging using computer-based expert systems and the plant's operating experience. During these tests Yankee Atomic found embrittlement of the reactor vessel.

Smith, D.J.

1991-10-01T23:59:59.000Z

303

Nuclear safety procedure upgrade project at USEC/MMUS gaseous diffusion plants  

SciTech Connect

Martin Marietta Utility Services has embarked on a program to upgrade procedures at both of its Gaseous Diffusion Plant sites. The transition from a U.S. Department of Energy government-operated facility to U.S. Nuclear Regulatory Commission (NRC) regulated has necessitated a complete upgrade of plant operating procedures and practices incorporating human factors as well as a philosophy change in their use. This program is designed to meet the requirements of the newly written 10CFR76, {open_quotes}The Certification of Gaseous Diffusion Plants,{close_quotes} and aid in progression toward NRC certification. A procedures upgrade will help ensure increased nuclear safety, enhance plant operation, and eliminate personnel procedure errors/occurrences.

Kocsis, F.J. III

1994-12-31T23:59:59.000Z

304

Waste Isolation Pilot Plant 2003 Site Environmental Report  

NLE Websites -- All DOE Office Websites (Extended Search)

submitted as required to: submitted as required to: Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831 Prices available from (615) 576-8401 Additional information about this document may be obtained by calling (800) 336-9477. Copies may be obtained by contacting the National Technical Information Service, U.S. Department of Commerce, 5285 Port Royal Road, Springfield, VA 22161 Processing and final preparation of this report was performed by the Waste Isolation Pilot Plant Management and Operating Contractor for the U.S. Department of Energy under Contract No. DE-AC04-01AL66444. Waste Isolation Pilot Plant 2003 Site Environmental Report DOE/WIPP 04-2225 i EXECUTIVE SUMMARY The mission of Waste Isolation Pilot Plant (WIPP) is to safely and permanently dispose

305

How many nuclear power plants are in the U.S. and where are they ...  

U.S. Energy Information Administration (EIA)

How many nuclear power plants are in the U.S. and where are they located? There are currently 65 commercially operating nuclear power plants with 104 nuclear reactors ...

306

The Next Generation Nuclear Plant (NGNP) Project  

DOE Green Energy (OSTI)

The Next Generation Nuclear Power (NGNP) Project will demonstrate emissions-free nuclearassisted electricity and hydrogen production by 2015. The NGNP reactor will be a helium-cooled, graphite moderated, thermal neutron spectrum reactor with a design goal outlet temperature of 1000 C or higher. The reactor thermal power and core configuration will be designed to assure passive decay heat removal without fuel damage during hypothetical accidents. The fuel cycle will be a once-through very high burnup low-enriched uranium fuel cycle. This paper provides a description of the project to build the NGNP at the Idaho National Engineering and Environmental Laboratory (INEEL). The NGNP Project includes an overall reactor design activity and four major supporting activities: materials selection and qualification, NRC licensing and regulatory support, fuel development and qualification, and the hydrogen production plant. Each of these activities is discussed in the paper. All the reactor design and construction activities will be managed under the DOE’s project management system as outlined in DOE Order 413.3. The key elements of the overall project management system discussed in this paper include the client and project management organization relationship, critical decisions (CDs), acquisition strategy, and the project logic and timeline. The major activities associated with the materials program include development of a plan for managing the selection and qualification of all component materials required for the NGNP; identification of specific materials alternatives for each system component; evaluation of the needed testing, code work, and analysis required to qualify each identified material; preliminary selection of component materials; irradiation of needed sample materials; physical, mechanical, and chemical testing of unirradiated and irradiated materials; and documentation of final materials selections. The NGNP will be licensed by the NRC under 10 CFR 50 or 10 CFR 52, for the purpose of demonstrating the suitability of high-temperature gas-cooled reactors for commercial electric power and hydrogen production. Products that will support the licensing of the NGNP include the environmental impact statement, the preliminary safety analysis report, the NRC construction permit, the final safety analysis report, and the NRC operating license. The fuel development and qualification program consists of five elements: development of improved fuel manufacturing technologies, fuel and materials irradiations, safety testing and post-irradiation examinations, fuel performance modeling, and fission product transport and source term modeling. Two basic approaches will be explored for using the heat from the high-temperature helium coolant to produce hydrogen. The first technology of interest is the thermochemical splitting of water into hydrogen and oxygen. The most promising processes for thermochemical splitting of water are sulfur-based and include the sulfur-iodine, hybrid sulfur-electrolysis, and sulfur-bromine processes. The second technology of interest is thermally assisted electrolysis of water. The efficiency of this process can be substantially improved by heating the water to high-temperature steam before applying electrolysis.

F. H. Southworth; P. E. MacDonald

2003-11-01T23:59:59.000Z

307

Nuclear dual-purpose plants for industrial energy  

SciTech Connect

One of the major obstacles to extensive application of nuclear power to industrial heat is the difference between the relatively small energy requirements of individual industrial plants and the large thermal capacity of current power reactors. A practical way of overcoming this obstacle would be to operate a centrally located dual-purpose power plant that would furnish process steam to a cluster of industrial plants, in addition to generating electrical power. The present study indicates that even relatively remote industrial plants could be served by the power plant, since it might be possible to convey steam economically as much as ten miles or more. A survey of five major industries indicates a major potential market for industrial steam from large nuclear power stations.

Klepper, O.H.

1976-01-01T23:59:59.000Z

308

The Decommissioning of the Trino Nuclear Power Plant  

Science Conference Proceedings (OSTI)

Following a referendum in Italy in 1987, the four Nuclear Power Plants (NPPs) owned and operated by the state utility ENEL were closed. After closing the NPPs, ENEL selected a ''safestore'' decommissioning strategy; anticipating a safestore period of some 40-50 years. This approach was consistent with the funds collected during plant operation, and was reinforced by the lack of both a waste repository and a set of national free release limits for contaminated materials in Italy. During 1999, twin decisions were made to privatize ENEL and to transform the nuclear division into a separate subsidiary of the ENEL group. This group was renamed Sogin and during the following year, ownership of the company was transferred to the Italian Treasury. On formation, Sogin was asked by the Italian government to review the national decommissioning strategy. The objective of the review was to move from a safestore strategy to a prompt decommissioning strategy, with the target of releasing all of the nuclear sites by 2020. It was recognized that this target was conditional upon the availability of a national LLW repository together with interim stores for both spent fuel and HLW by 2009. The government also agreed that additional costs caused by the acceleration of the decommissioning program would be considered as stranded costs. These costs will be recovered by a levy on the kWh price of electricity, a process established and controlled by the Regulator of the Italian energy sector. Building on the successful collaboration to develop a prompt decommissioning strategy for the Latina Magnox reactor (1), BNFL and Sogin agreed to collaborate on an in depth study for the prompt decommissioning of the Sogin PWR at Trino. BNFL is currently decommissioning six NPPs and is at an advanced stage of planning for two further units, having completed a full and rigorous exercise to develop Baseline Decommissioning Plans (BDP's) for these stations. The BDP exercise utilizes the full range of BNFL decommissioning experience and knowledge to develop a strategy, methodology and cost for the decommissioning of NPPs. Over the past year, a prompt decommissioning strategy for Trino has been developed. The strategy has been based on the principles of minimizing waste products that require long term storage, maximizing 'free release' materials and utilizing existing and regulatory approved technologies.

Brusa, L.; DeSantis, R.; Nurden, P. L.; Walkden, P.; Watson, B.

2002-02-27T23:59:59.000Z

309

Advanced Cooling Options for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Alternative power plant cooling systems exist that offer significant opportunity for reducing the amount of water used in power plant cooling. These systems include direct dry cooling using air-cooled condensers, indirect dry cooling using air-cooled heat exchangers paired with water-cooled surface condensers, and a variety of hybrid systems incorporating both dry and wet cooling elements. The water savings afforded by the use of these systems, however, comes at a price in the form of more expensive ...

2013-11-27T23:59:59.000Z

310

Paducah and Portsmouth Sites Advance Operations at DUF6 Plants | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

and Portsmouth Sites Advance Operations at DUF6 Plants and Portsmouth Sites Advance Operations at DUF6 Plants Paducah and Portsmouth Sites Advance Operations at DUF6 Plants November 1, 2011 - 12:00pm Addthis First cylinder enters plant. First cylinder enters plant. Paducah and Portsmouth Sites Advance Operations at DUF6 Plants First cylinder enters plant. Paducah and Portsmouth Sites Advance Operations at DUF6 Plants Paducah and Portsmouth - Babcock & Wilcox Conversion Services (BWCS) began work at the Paducah and Portsmouth sites in March with the goal of making two depleted uranium hexafluoride (DUF6) conversion plants fully operational. The DOE site operations contactor achieved that goal at 3:43 p.m. Sept. 30 when all seven conversion lines at the plants were designated fully operational. "Our next goal is to bring all seven lines to steady state commercial

311

Chu Visits Site of America's First New Nuclear Reactor in Three...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chu Visits Site of America's First New Nuclear Reactor in Three Decades Chu Visits Site of America's First New Nuclear Reactor in Three Decades February 15, 2012 - 2:12pm Addthis...

312

Chu Visits Site of America's First New Nuclear Reactor in Three...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chu Visits Site of America's First New Nuclear Reactor in Three Decades Chu Visits Site of America's First New Nuclear Reactor in Three Decades February 15, 2012 - 12:40pm Addthis...

313

Waste Isolation Pilot Plant CY 2000 Site Environmental Report  

SciTech Connect

The U.S. Department of Energy's (DOE) Carlsbad Field Office and Westinghouse TRU Solutions, LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2000 Site Environmental Report summarizes environmental data from calendar year (CY) 2000 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T), and the Waste Isolation Pilot Plant Environmental Protect ion Implementation Plan (DOE/WIPP 96-2199). The above orders and guidance documents require that DOE facilities submit an Annual Site Environmental Report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health. The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2000. The format of this report follows guidance offered in a June 1, 2001 memo from DOE's Office of Policy and Guidance with the subject ''Guidance for the preparation of Department of Energy (DOE) Annual Site Environmental Reports (ASERs) for Calendar Year 2000.'' WIPP received its first shipment of waste on March 26, 1999. In 2000, no evidence was found of any adverse effects from WIPP on the surrounding environment.

Westinghouse TRU Solutions, LLC; Environmental Science and Research Foundation, Inc.

2001-12-31T23:59:59.000Z

314

Development of the DOE Nuclear Criticality Safety Program Web Site for the Nuclear Criticality Safety Professional  

SciTech Connect

Development of the DOE Nuclear Criticality Safety Program (NCSP) web site is the result of the efforts of marry members of the Nuclear Criticality Safety (NCS) community and is maintained by Lawrence Livermore National Laboratory under the direction of the NCSP Management Team. This World Wide Web (WWW) resource was developed as part of the DOE response to the DNFSB Recommendation 97-2, which reflected the need to make criticality safety information available to a wide audience. The NCSP web site provides information of interest to NCS professionals and includes links to other sites actively involved in the collection and dissemination of criticality safety information. To the extent possible, the hyperlinks on this web site direct the user to the original source of the referenced material in order to ensure access to the latest, most accurate version.

Lee, C.K.; Huang, S.; Morman, J.A.; Garcia, A.S.

2000-02-01T23:59:59.000Z

315

Nuclear safety surveillance and control of National Nuclear Safety Administration of PRC during commissioning and operation of nuclear power plants  

Science Conference Proceedings (OSTI)

This article describes the method of nuclear safety surveillance and control of National Nuclear Safety Administration (NNSA) of PRC during commissioning and operation of nuclear power plants (NPPs) and the practice for Qinshan NPP and for Guangdong Daya Bay NPP (GNPS). The results of the practice show that the surveillance models set up for Qinshan NPP and for GNPS commissioning were effective and the surveillance has played an important role for ensuring the quality and safety of the commissioning testing and consequently the nuclear safety of these two plants.

Feng, W.; Zhang, C.

1994-12-31T23:59:59.000Z

316

Advanced Nuclear Technology: Equipment Reliability for New Nuclear Plant Projects: Industry Recommendations for Storage, Construction, and Testing  

Science Conference Proceedings (OSTI)

The initial and continued good operating performance of the current build of new nuclear plants is critical to the rebirth of the nuclear option in many countries and vital to the companies making the large investments required for new nuclear plants. One of the foundations of good performance is a sound process for establishing and sustaining plant equipment reliability (ER).

2010-08-26T23:59:59.000Z

317

Nuclear Power Plant Containment Pressure Boundary Research  

SciTech Connect

Research to address aging of the containment pressure boundary in light-water reactor plants is summarized. This research is aimed at understanding the significant factors relating occurrence of corrosion, efficacy of inspection, and structural capacity reduction of steel containment and liners of concrete containment. This understanding will lead to improvements in risk-informed regulatory decision making. Containment pressure boundary components are described and potential aging factors identified. Quantitative tools for condition assessments of aging structures to maintain an acceptable level of reliability over the service life of the plant are discussed. Finally, the impact of aging (i.e., loss of shell thickness due to corrosion) on steel containment fragility for a pressurized water reactor ice-condenser plant is presented.

Cherry, J.L.; Chokshi, N.C.; Costello, J.F.; Ellingwood, B.R.; Naus, D.J.

1999-09-15T23:59:59.000Z

318

CERTIFICATION DOCKET FOR THE F0RhqE.R SITE OF THE RADIOACTIVE LIQUID WASTE TREATMENT PLANT (TA-45)  

Office of Legacy Management (LM)

CERTIFICATION DOCKET CERTIFICATION DOCKET FOR THE F0RhqE.R SITE OF THE RADIOACTIVE LIQUID WASTE TREATMENT PLANT (TA-45) AND THE EFFLUENT RECEIVING AREAS OF ACID, PUEBLO, AND LOS ALAMOS CANYOM, LOS ALAMOS, NEW MEXICO DEPARTMENT OF ENERGY Office of Nuclear Energy Office of Terminal Waste Disposal and Remedial Action Division of Remedial Action Projects -. CONTENTS A Page - Introduction to the Certification Docket for the Former Site of the Radioactive Liquid Waste Treatment Plant (TA-45) and the Effluent Receiving Areas of Acid, Pueblo, and Los Alamos Canyons, Los Alamos, New Mexico Description of the Formeriy Utilized Sites Program at the Former Site of the T.4-45 Treatment Plant and Acid, Pueblo, and Los Alamos Canyons Purpose Property Identification Docket Contents

319

Transgenic plants are sensitive bioindicators of nuclear pollution caused by the Chernobyl accident  

SciTech Connect

To evaluate the genetic consequences of radioactive contamination originating from the Nuclear reactor accident of Chernobyl on indigenous populations of plants and animals, it is essential to determine the rates of accumulating genetic changes in chronically irradiated populations. An increase in germline mutation rates in humans living close to the Chernobyl Nuclear Power Plant site, and a two- to tenfold increase in germline mutations in barn swallows breeding in Chernobyl have been reported. Little is known, however, about the effects of chronic irradiation on plant genomes. Ionizing radiation causes double-strand breaks in DNA, which are repaired via illegitimate or homologous recombination. The authors make use of Arabidopsis thaliana plants carrying a {beta}-glucuronidase marker gene as a recombination substrate to monitor genetic alterations in plant populations, which are caused by nuclear pollution of the environment around Chernobyl. A significant increase in somatic intrachromosomal recombination frequencies was observed at nuclear pollution levels from 0.1--900 Ci/km{sup 2}, consistent with an increase in chromosomal aberrations. This bioindicator may serve as a convenient and ethically acceptable alternative to animal systems.

Kovalchuk, I.; Kovalchuk, O. [Ivano-Frankivsk State Medical Academy (Ukraine)]|[Friedrich Miescher Inst., Basel (Switzerland); Arkhipov, A. [Chernobyl Scientific and Technical Center of International Research (Ukraine); Hohn, B. [Friedrich Miescher Inst., Basel (Switzerland)

1998-11-01T23:59:59.000Z

320

Effect of Nuclear Power Plant Decommissioning Costs on Plant Life Cycle Decisions  

Science Conference Proceedings (OSTI)

Nuclear utilities implementing Life Cycle Management (LCM) Programs and facing run-relicense-retire decisions need to evaluate the financial cost/benefit of such decisions. Decommissioning costs are one element of these evaluations. This report includes a decommissioning cost estimate for Calvert Cliffs Nuclear Power Plant (CCNPP) that can be used as a reference source by nuclear utilities involved in LCM and license renewal (LR) decisions.

1995-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Plant Engineering: Predicting Nuclear Plant Output from Performance Losses and Gains  

Science Conference Proceedings (OSTI)

The marginal costs of generating electricity, together with the strong emphasis on maximizing production at today's nuclear power generating units, have increased the need for nuclear plant thermal performance engineers (TPEs) to determine the gap between the station's actual performance and its ultimate capability. This report from the Electric Power Research Institute (EPRI) outlines the various items that influence the performance of a nuclear unit and gives the TPE methods to employ in estimating the...

2011-12-15T23:59:59.000Z

322

Waste Isolation Pilot Plant Site Environmental Report Calendar Year 2002  

Science Conference Proceedings (OSTI)

The United States (U.S.) Department of Energy (DOE) Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environment, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2002 Site Environmental Report summarizes environmental data from calendar year 2002 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, and Guidance for the Preparation of DOE Annual Site Environmental Reports (ASERs) for Calendar Year 2002 (DOE Memorandum EH-41: Natoli:6-1336, April 4, 2003). These Orders and the guidance document require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED).

Washington Regulatory and Environmental Services

2003-09-17T23:59:59.000Z

323

Program on Technology Innovation: The Next Generation Nuclear Plant  

Science Conference Proceedings (OSTI)

This Technology Update documents the Next Generation Nuclear Plant (NGNP) project, which will demonstrate the design, licensing, construction, and operation of a new nuclear energy source using high-temperature gas-cooled reactor (HTGR) technology. This new non-emitting energy source is applicable to a broad range of uses, from generating electricity to providing high-temperature industrial process heat to producing hydrogen. The NGNP project is sponsored as part of the Energy Policy Act of 2005 and envi...

2008-12-15T23:59:59.000Z

324

Nuclear Power Plant Fire Modeling Application Guide (NPP FIRE MAG)  

Science Conference Proceedings (OSTI)

There is a movement to introduce risk-informed and performance-based (RI/PB) analyses into fire protection engineering practice, both domestically and worldwide.  This movement exists in both the general fire protection and the nuclear power plant (NPP) fire protection communities.  The U.S. Nuclear Regulatory Commission (NRC) has used risk-informed insights as a part of its regulatory decision making since the 1990s.In 2001, the National Fire Protection Association (NFPA) ...

2012-11-30T23:59:59.000Z

325

Materials Handbook for Nuclear Plant Pressure Boundary Applications (2013)  

Science Conference Proceedings (OSTI)

Utility engineers require accurate structural materials properties and performance data to make decisions regarding the adequacy of materials for nuclear power applications. To meet this need, the Electric Power Research Institute (EPRI) publishes the Materials Handbook for Nuclear Plant Pressure Boundary Applications, which has been updated and revised since its initial publication in 1998. The primary focus of the handbook is on pressure boundary materials such as those used for piping ...

2013-03-28T23:59:59.000Z

326

Toshiba's developments on construction techniques of nuclear power plants  

SciTech Connect

Reliable and economic energy supplies are fundamental requirements of energy policies in Japan. To accomplish these needs, nuclear power plants are being increased in Japan. In recent years, construction cost increases and schedule extensions have affected the capital cost of nuclear energy, compared with fossil power plants, due to lower costs of oil and coal. On the other hand, several severe regulations have been applied to nuclear power plant designs. High-quality and cooperative engineering and harmonized design of equipment and parts are strongly required. Therefore, reduced construction costs and scheduling, as well as higher quality and reliability, are the most important items for nuclear industry. Toshiba has developed new construction techniques, as well as design and engineering tools for control and management, that demonstrate the positive results achieved in the shorter construction period of 1100-MW(electric) nuclear power plants. The normal construction period so far is 64 months, whereas the current construction period is 52 months. (New construction techniques are partially applied). In future years, the construction period will be lowered to 48 months. (New construction techniques are fully applied). A construction period is defined as time from the start of rock inspection to the start of commercial operation.

Hayashi, Y.; Itoh, N.

1987-01-01T23:59:59.000Z

327

Report on aging of nuclear power plant reinforced concrete structures  

Science Conference Proceedings (OSTI)

The Structural Aging Program provides the US Nuclear Regulatory Commission with potential structural safety issues and acceptance criteria for use in continued service assessments of nuclear power plant safety-related concrete structures. The program was organized under four task areas: Program Management, Materials Property Data Base, Structural Component Assessment/Repair Technology, and Quantitative Methodology for Continued Service Determinations. Under these tasks, over 90 papers and reports were prepared addressing pertinent aspects associated with aging management of nuclear power plant reinforced concrete structures. Contained in this report is a summary of program results in the form of information related to longevity of nuclear power plant reinforced concrete structures, a Structural Materials Information Center presenting data and information on the time variation of concrete materials under the influence of environmental stressors and aging factors, in-service inspection and condition assessments techniques, repair materials and methods, evaluation of nuclear power plant reinforced concrete structures, and a reliability-based methodology for current and future condition assessments. Recommendations for future activities are also provided. 308 refs., 61 figs., 50 tabs.

Naus, D.J.; Oland, C.B. [Oak Ridge National Lab., TN (United States); Ellingwood, B.R. [Johns Hopkins Univ., Baltimore, MD (United States). Dept. of Civil Engineering

1996-03-01T23:59:59.000Z

328

Fire models for assessment of nuclear power plant fires  

SciTech Connect

This paper reviews the state-of-the-art in available fire models for the assessment of nuclear power plants fires. The advantages and disadvantages of three basic types of fire models (zone, field, and control volume) and Sandia's experience with these models will be discussed. It is shown that the type of fire model selected to solve a particular problem should be based on the information that is required. Areas of concern which relate to all nuclear power plant fire models are identified. 17 refs., 6 figs.

Nicolette, V.F.; Nowlen, S.P.

1989-01-01T23:59:59.000Z

329

A methodology for evaluating ``new`` technologies in nuclear power plants  

SciTech Connect

As obsolescence and spare parts issues drive nuclear power plants to upgrade with new technology (such as optical fiber communication systems), the ability of the new technology to withstand stressors present where it is installed needs to be determined. In particular, new standards may be required to address qualification criteria and their application to the nuclear power plants of tomorrow. This paper discusses the failure modes and age-related degradation mechanisms of fiber optic communication systems, and suggests a methodology for identifying when accelerated aging should be performed during qualification testing.

Korsah, K.; Clark, R.L.; Holcomb, D.E.

1994-06-01T23:59:59.000Z

330

Next Generation Nuclear Plant Materials Research and Development Program Plan  

DOE Green Energy (OSTI)

The U.S Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design will be a graphite moderated, helium-cooled, prismatic or pebble-bed, thermal neutron spectrum reactor that will produce electricity and hydrogen in a state-of-the-art thermodynamically efficient manner. The NGNP will use very high burn-up, low-enriched uranium, TRISO-coated fuel and have a projected plant design service life of 60 years.

G. O. Hayner; E.L. Shaber

2004-09-01T23:59:59.000Z

331

Nuclear facility decommissioning and site remedial actions: a selected bibliography  

SciTech Connect

This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

1982-09-01T23:59:59.000Z

332

Nuclear facility decommissioning and site remedial actions: a selected bibliography  

SciTech Connect

This bibliography contains 693 references with abstracts on the subject of nuclear facility decommissioning, uranium mill tailings management, and site remedial actions. Foreign, as well as domestic, literature of all types - technical reports, progress reports, journal articles, conference papers, symposium proceedings, theses, books, patents, legislation, and research project descriptions - has been included in this publication. The bibliography contains scientific (basic research as well as applied technology), economic, regulatory, and legal literature pertinent to the US Department of Energy's Remedial Action Program. Major chapters are Surplus Facilities Management Program, Nuclear Facilities Decommissioning, Formerly Utilized Sites Remedial Action Program, Uranium Mill Tailings Remedial Action Program, Grand Junction Remedial Action Program, and Uranium Mill Tailings Management. Chapter sections for chapters 1 and 2 include: Design, Planning, and Regulations; Site Surveys; Decontamination Studies; Dismantlement and Demolition; Land Decontamination and Reclamation; Waste Disposal; and General Studies. The references within each chapter are arranged alphabetically by leading author. References having no individual author are arranged by corporate author or by title. Indexes are provided for (1) author; (2) corporate affiliation; (3) title; (4) publication description; (5) geographic location; and (6) keywords. An appendix of 202 bibliographic references without abstracts or indexes has been included in this bibliography. This appendix represents literature identified but not abstracted due to time constraints.

Owen, P.T.; Knox, N.P.; Fielden, J.M.; Johnson, C.A.

1982-09-01T23:59:59.000Z

333

Waste Isolation Pilot Plant 2002 Site Environmental Report  

NLE Websites -- All DOE Office Websites (Extended Search)

reproduced directly from the best possible copy. It is reproduced directly from the best possible copy. It is available to DOE and DOE contractors from the following address: Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831 Prices available from (615) 576-8401 Available to the public from the National Technical Information Services United States Department of Commerce 5285 Port Royal Road Springfield, Virginia 22161 Processing and final preparation of this report was performed by the Waste Isolation Pilot Plant Management and Operating Contractor for the U.S. Department of Energy under Contract No. DE-AC04-01AL66444. Waste Isolation Pilot Plant 2002 Site Environmental Report DOE/WIPP 03-2225 iii ACKNOWLEDGMENTS We appreciate the reviews by Harold Johnson and Dr. E. B. Nuckols of the United

334

Engineering assessment of inactive uranium mill tailings: Phillips/United Nuclear site, Ambrosia Lake, New Mexico  

SciTech Connect

Ford, Bacon and Davis Utah, Inc., has reevaluated the Phillips/United Nuclear site in order to revise the December 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Ambrosia Lake, New Mexico. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from 2.6 million dry tons of tailings at the Phillips/United Nuclear site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material, to removal of the tailings to remote disposal sites and decontamination of the tailings site. Cost estimates for the four options range from about $21,500,000 for stabilization in-place, to about $45,200,000 for disposal at a distance of about 15 mi. Three principal alternatives for the reprocessing of the Phillips/United Nuclear tailings were examined: heap leaching; treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing.The cost of the uranium recovered would be about $87/lb of U/sub 3/O/sub 8/ by either heap leach or conventional plant process. The spot market price for uranium was $25/lb early in 1981. Reprocessing the Phillips/United Nuclear tailings for uranium recovery does not appear to be economically attractive under present or foreseeable market conditions.

Not Available

1981-10-01T23:59:59.000Z

335

Liquid metal cooled nuclear reactor plant system  

DOE Patents (OSTI)

A liquid metal cooled nuclear reactor having a passive cooling system for removing residual heat resulting for fuel decay during reactor shutdown, or heat produced during a mishap. The reactor system is enhanced with sealing means for excluding external air from contact with the liquid metal coolant leaking from the reactor vessel during an accident. The invention also includes a silo structure which resists attack by leaking liquid metal coolant, and an added unique cooling means.

Hunsbedt, Anstein (Los Gatos, CA); Boardman, Charles E. (Saratoga, CA)

1993-01-01T23:59:59.000Z

336

Waste Isolation Pilot Plant 2001 Site Environmental Report  

Science Conference Proceedings (OSTI)

The United States (U.S.) Department of Energy's (DOE) Carlsbad Field Office (CBFO) and Westinghouse TRU Solutions LLC (WTS) are dedicated to maintaining high quality management of Waste Isolation Pilot Plant (WIPP) environmental resources. DOE Order 5400.1, General Environmental Protection Program, and DOE Order 231.1, Environmental, Safety, and Health Reporting, require that the environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This Waste Isolation Pilot Plant 2001 Site Environmental Report summarizes environmental data from calendar year (CY) 2001 that characterize environmental management performance and demonstrate compliance with federal and state regulations. This report was prepared in accordance with DOE Order 5400.1, DOE Order 231.1, the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH- 0173T), and the Waste Isolation Pilot Plant Environmental Protection Implementation Plan (DOE/WIPP 96-2199). The above Orders and guidance documents require that DOE facilities submit an annual site environmental report to DOE Headquarters, Office of the Assistant Secretary for Environment, Safety, and Health; and the New Mexico Environment Department (NMED). The purpose of this report is to provide a comprehensive description of operational environmental monitoring activities, to provide an abstract of environmental activities conducted to characterize site environmental management performance to confirm compliance with environmental standards and requirements, and to highlight significant programs and efforts of environmental merit at WIPP during CY 2001. WIPP received its first shipment of waste on March 26, 1999. In 2001, no evidence was found of any adverse effects from WIPP on the surrounding environment.

Westinghouse TRU Solutions, Inc.

2002-09-20T23:59:59.000Z

337

Radiation Protection Program Resource Optimization Project; Brunswick Nuclear Plant  

Science Conference Proceedings (OSTI)

Radiation protection (RP) managers face challenges in providing a necessary service that complies with stringent regulations, while simultaneously reducing operations and maintenance (O&M) costs. The results of this pilot project, hosted by Brunswick Nuclear Plant (BNP), will assist utilities in targeting resource commitments and cost effectiveness while optimizing overall performance. This report identifies specific program cost reduction and process performance enhancements for the host plant, and esta...

2002-11-18T23:59:59.000Z

338

Optimization of Auxiliaries Consumption in Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Operators of nuclear power plants face significant challenges to produce power more cost-effectively. One approach to producing power more cost-effectively is to reduce power consumption by auxiliary systems in the plant, leading to more power available for the grid. This report provides guidance for assessing auxiliary system performance and recommends approaches to reduce their power consumption. The report also presents results from questionnaires on auxiliary system consumption and, in some cases, ac...

2005-02-08T23:59:59.000Z

339

Plant Support Engineering: Guidance for Replacing Feedwater Heaters at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Utilities continue to pursue license renewal applications and power uprates, and these initiatives are being undertaken in an aging fleet of nuclear plants. Many plants are facing the necessity of replacing feedwater heaters to support these initiatives. However, industry expertise to support such activities has diminished since the days of plant construction8212there are fewer qualified vendors and equipment manufacturers, materials might have changed, and licensees are typically not staffed for these m...

2007-07-26T23:59:59.000Z

340

Plant Support Engineering: Guidance for Replacing Inverters and Battery Chargers at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Utilities are continuing to pursue license renewal applications and power uprates, and these initiatives are being undertaken on an aging fleet of nuclear plants. Many plants must replace inverters and battery chargers to support these initiatives. However, industry expertise to support such activities has diminished since the days of plant constructionthere are fewer qualified vendors and equipment manufacturers, materials have changed in many cases, and licensees are typically not currently staffed for...

2008-10-29T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Plant Support Engineering: Guidance for Planned Replacement of Large Power Transformers at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Utilities continue to pursue license renewal applications and power uprates, and these initiatives are being undertaken on an aging fleet of nuclear plants. Many plants are facing the necessity of replacing large power transformers to support these initiatives. However, industry expertise to support such activities has diminished since the days of plant construction8212there are fewer qualified vendors and equipment manufacturers, materials and standards might have changed, and licensees are typically no...

2007-11-02T23:59:59.000Z

342

State of the art review of radioactive waste volume reduction techniques for commercial nuclear power plants  

Science Conference Proceedings (OSTI)

A review is made of the state of the art of volume reduction techniques for low level liquid and solid radioactive wastes produced as a result of: (1) operation of commercial nuclear power plants, (2) storage of spent fuel in away-from-reactor facilities, and (3) decontamination/decommissioning of commercial nuclear power plants. The types of wastes and their chemical, physical, and radiological characteristics are identified. Methods used by industry for processing radioactive wastes are reviewed and compared to the new techniques for processing and reducing the volume of radioactive wastes. A detailed system description and report on operating experiences follow for each of the new volume reduction techniques. In addition, descriptions of volume reduction methods presently under development are provided. The Appendix records data collected during site surveys of vendor facilities and operating power plants. A Bibliography is provided for each of the various volume reduction techniques discussed in the report.

Not Available

1980-04-01T23:59:59.000Z

343

USED NUCLEAR MATERIALS AT SAVANNAH RIVER SITE: ASSET OR WASTE?  

SciTech Connect

The nuclear industry, both in the commercial and the government sectors, has generated large quantities of material that span the spectrum of usefulness, from highly valuable (“assets”) to worthless (“wastes”). In many cases, the decision parameters are clear. Transuranic waste and high level waste, for example, have no value, and is either in a final disposition path today, or – in the case of high level waste – awaiting a policy decision about final disposition. Other materials, though discardable, have intrinsic scientific or market value that may be hidden by the complexity, hazard, or cost of recovery. An informed decision process should acknowledge the asset value, or lack of value, of the complete inventory of materials, and the structure necessary to implement the range of possible options. It is important that informed decisions are made about the asset value for the variety of nuclear materials available. For example, there is a significant quantity of spent fuel available for recycle (an estimated $4 billion value in the Savannah River Site’s (SRS) L area alone); in fact, SRS has already blended down more than 300 metric tons of uranium for commercial reactor use. Over 34 metric tons of surplus plutonium is also on a path to be used as commercial fuel. There are other radiological materials that are routinely handled at the site in large quantities that should be viewed as strategically important and / or commercially viable. In some cases, these materials are irreplaceable domestically, and failure to consider their recovery could jeopardize our technological leadership or national defense. The inventories of nuclear materials at SRS that have been characterized as “waste” include isotopes of plutonium, uranium, americium, and helium. Although planning has been performed to establish the technical and regulatory bases for their discard and disposal, recovery of these materials is both economically attractive and in the national interest.

Magoulas, V.

2013-06-03T23:59:59.000Z

344

Aging assessment of large electric motors in nuclear power plants  

Science Conference Proceedings (OSTI)

Large electric motors serve as the prime movers to drive high capacity pumps, fans, compressors, and generators in a variety of nuclear plant systems. This study examined the stressors that cause degradation and aging in large electric motors operating in various plant locations and environments. The operating history of these machines in nuclear plant service was studied by review and analysis of failure reports in the NPRDS and LER databases. This was supplemented by a review of motor designs, and their nuclear and balance of plant applications, in order to characterize the failure mechanisms that cause degradation, aging, and failure in large electric motors. A generic failure modes and effects analysis for large squirrel cage induction motors was performed to identify the degradation and aging mechanisms affecting various components of these large motors, the failure modes that result, and their effects upon the function of the motor. The effects of large motor failures upon the systems in which they are operating, and on the plant as a whole, were analyzed from failure reports in the databases. The effectiveness of the industry`s large motor maintenance programs was assessed based upon the failure reports in the databases and reviews of plant maintenance procedures and programs.

Villaran, M.; Subudhi, M. [Brookhaven National Lab., Upton, NY (United States)

1996-03-01T23:59:59.000Z

345

Enhancing Cross-Correlation Analysis with Artificial Neural Networks for Nuclear Power Plant Feedwater Flow Measurement  

Science Conference Proceedings (OSTI)

One of the primary cost-saving objectives of the power plant industry, including the nuclear industry, has long been the efficient operation of plant systems. Since the maximum operating thermal power of any nuclear plant is bounded by the specific licensing ... Keywords: flow measurement, neural networks, nuclear power plant

Davide Roverso; Da Ruan

2004-05-01T23:59:59.000Z

346

Carbon-14 Dose Calculation Methods at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Carbon-14 (C-14) is a naturally occurring isotope of carbon produced by cosmic radiation interactions in the upper atmosphere. Nuclear weapons testing in the 1950s and 1960s significantly increased the amount of C-14 in the atmosphere. C-14 is also produced in commercial nuclear reactors, but the amounts produced are much less than those produced naturally or from weapons testing. C-14 is released through permitted effluent pathways of a nuclear power plant. This report provides the current industry best...

2012-04-26T23:59:59.000Z

347

Site selection and assessment for a nuclear storage facility  

SciTech Connect

We investigate the structure and accuracy of the decision making process in finding an optimal location for stored nuclear materials for 25-50 years. Using a well-documented facility design, benefit hierarchy is set up for different sites to rank a given site for different options. Criteria involve safeguards standards, technical viability, environmental effects, economics, political impact, and public acceptance. Problem faced here is multi-criterion decision making. Two approaches are investigated: analytic hierarchy process (AHP) of Saaty, and fuzzy logic approach of Yager. Whereas AHP requires a pairwise comparison of criteria and pairwise comparison of alternatives, in Yager`s approach each alternative is considered independently, allowing one to extend the analysis without performing time-consuming computation.

Rutherford, D.A.; Zardecki, A.

1996-09-01T23:59:59.000Z

348

Peach Bottom and Vermont Yankee Nuclear Power Plants  

Science Conference Proceedings (OSTI)

A dramatic and extraordinary instance of state and local government control of nuclear power, the purchase by New York of the Shoreham plant is nonetheless indicative of the political demands that some states confront for additional involvement in the regulation of the radiological hazards associated with commercial nuclear power plants. Although the Supreme Court has appeared to expand, in the eight years since PG&E and Silkwood, the acceptable extent of state regulation, some states, in addition to New York, have acquired, with the acquiescence of the NRC, a degree of involvement that exceeds the role for state and local governments provided by the Court. For example, the Commonwealth of Pennsylvania concluded with the Philadelphia Electric Company (PECO) in June 1989 an agreement that commits PECO to various initiatives, not otherwise required under NRC regulations, for the safe operation of the Peach Bottom nuclear power plant in Pennsylvania. In July 1991 the State of Vermont and Vermont Yankee Nuclear Power Corporation (Vermont Yankee) concluded an agreement similar to that concluded between Pennsylvania and PECO. The agreement also commits Vermont Yankee to certain initiatives, not otherwise required under NRC regulations, related to its operation of the Vermont Yankee nuclear power plant in Vermont. The agreement was precipitated by a challenge to an application, submitted to the NRC by Vermont Yankee in April 1989, to amend the Vermont Yankee plant license to extend its expiration date from December 11, 2007 to March 21, 2012. The amendment would allow the Vermont Yankee plant to operate for forty full years.

NONE

1992-12-31T23:59:59.000Z

349

Application of Nuclear Energy for Seawater Desalination: Design Concepts of Nuclear Desalination Plants  

SciTech Connect

Nuclear energy is playing an important role in electricity generation, producing 16% of the world's electricity. However, most of the world's energy consumption is in the form of heat, in which case nuclear energy could also play an important role. In particular, process heat for seawater desalination using nuclear energy has been of growing interest to some Member States of the International Atomic Energy Agency over the past two decades. This growing interest stems from increasingly acute freshwater shortages in many arid and semi-arid zones around the world. Indeed, several national and international nuclear desalination demonstration programs are already under way or being planned. Of particular interest are projects for seawater nuclear desalination plants in coastal regions, where saline feed water can serve the dual purpose of cooling water for the nuclear reactor and as feed water for the desalination plant. In principle any nuclear reactor can provide energy (low-grade heat and/or electricity), as required by desalination processes. However, there are some additional requirements to be met under specific conditions in order to introduce nuclear desalination. Technical issues include meeting more stringent safety requirements (nuclear reactors themselves and nuclear-desalination integrated complexes in particular), and performance improvement of the integrated systems. Economic competitiveness is another important factor to be considered for a broader deployment of nuclear desalination. For technical robustness and economic competitiveness a number of design variants of coupling configurations of nuclear desalination integrated plant concepts are being evaluated. This paper identifies and discusses various factors, which support the attractiveness of nuclear desalination. It further summarizes some of the key approaches recommended for nuclear desalination complex design and gives an overview of various design concepts of nuclear desalination plants, which are experienced, being implemented or evaluated by several IAEA Member States. Operating experience with nuclear desalination using a liquid-metal reactor BN-350 in Kazakhstan and several Pressurized Water Reactor units in Japan is discussed. Results of economic analyses of nuclear desalination are also presented in order to illustrate the competitiveness of this technology with other conventional desalination operations. (authors)

Faibish, R.S.; Konishi, T.; Gasparini, M. [International Atomic Energy Agency - IAEA, P.O. Box 100, Wagramer Strasse 5, A-1400 Vienna (Austria)

2002-07-01T23:59:59.000Z

350

PM-1 NUCLEAR POWER PLANT PROGRAM PARAMETRIC STUDY REPORT  

SciTech Connect

The study deals with narrowing the range of parameters prior to preliminary design of the PM-1, a factory prepackaged, air-transportable, pressurized water nuclear power plant. The plant is to produce 1000 kw of net electrical power and 7 x 10/sup 6/ Btu/hr of space heat that is suitable for use with a central heating system. The data and conclusions resulting from the parametric study will provide the basis for the preliminary design of the PM-1 power plant. (W.D.M.)

Sieg, J.S.

1959-09-01T23:59:59.000Z

351

Privatization of the gaseous diffusion plants and impacts on nuclear criticality safety administration  

SciTech Connect

The Energy Policy Act of 1992 created the United States Enrichment Corporation (USEC) on July 1, 1993. The USEC is a government-owned business that leases those Gaseous Diffusion Plant (GDP) facilities at the Portsmouth, Ohio, and Paducah, Kentucky, sites from the U.S. Department of Energy (DOE) that are required for enriching uranium. Lockheed Martin Utility Services is the operating contractor for the USEC-leased facilities. The DOE has retained use of, and regulation over, some facilities and areas at the Portsmouth and Paducah sites for managing legacy wastes and environmental restoration activities. The USEC is regulated by the DOE, but is currently changing to regulation under the U.S. Nuclear Regulatory Commission (NRC). The USEC is also preparing for privatization of the uranium enrichment enterprise. These changes have significantly affected the nuclear criticality safety (NCS) programs at the sites.

D`Aquila, D.M.; Holliday, R.T. [Lockheed Martin Utility Services, Inc., Piketon, OH (United States); Dean, J.C. [Lockheed Martin Utility Services, Inc., Paducah, KY (United States)

1996-12-31T23:59:59.000Z

352

Radioactive Effluents from Nuclear Power Plants Annual Report 2008  

SciTech Connect

This report describes radioactive effluents from commercial nuclear power plants (NPPs) in the United States. This information was reported by the licensees for radioactive discharges that occurred in 2008. The report provides information relevant to the potential impact of NPPs on the environment and on public health.

U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation

2010-12-10T23:59:59.000Z

353

Radioactive Effluents from Nuclear Power Plants Annual Report 2007  

SciTech Connect

This report describes radioactive effluents from commercial nuclear power plants (NPPs) in the United States. This information was reported by the licensees for radioactive discharges that occurred in 2007. The report provides information relevant to the potential impact of NPPs on the environment and on public health.

U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation

2010-12-10T23:59:59.000Z

354

Is natural background or radiation from nuclear power plants leukemogenic  

SciTech Connect

The objective in this review is to provide some facts about normal hemopoietic cell proliferation relevant to leukemogenesis, physical, chemical, and biological facts about radiation effects with the hope that each person will be able to decide for themselves whether background radiation or emissions from nuclear power plants and facilities significantly add to the spontaneous leukemia incidence. 23 refs., 1 tab.

Cronkite, E.P.

1989-01-01T23:59:59.000Z

355

Delays in nuclear power plant construction. Volume II. Final report  

SciTech Connect

The report identifies barriers to shortening nuclear power plant construction schedules and recommends research efforts which should minimize or eliminate the identified barriers. The identified barriers include (1) Design and Construction Interfacing Problems; (2) Problems Relating to the Selection and Use of Permanent Materials and Construction Methods; (3) Construction Coordination and Communication Problems; and (4) Problems Associated with Manpower Availability and Productivity.

Mason, G.E.; Larew, R.E.; Borcherding, J.D.; Okes, S.R. Jr.; Rad, P.F.

1977-12-14T23:59:59.000Z

356

Radiation Data for Design and Qualification of Nuclear Plant Equipment  

Science Conference Proceedings (OSTI)

Graphic summaries in this report represent the most comprehensive collection to date of data on the degrading effects of radiation on organic materials used in nuclear plant equipment. The data, which can help designers in selecting radiation-resistant materials, can also help in qualifying equipment at minimum cost.

1985-08-01T23:59:59.000Z

357

Nuclear Plant Reliability: Data Collection and Usage Guide  

Science Conference Proceedings (OSTI)

Most nuclear utility programs and regulatory compliance actions involve several organizations within a utility and often have overlapping elements. Nearly all of these programs need extensive data. This report discusses some issues associated with the identification, collection, and effective use of plant data in support of such utility programs.

1992-07-14T23:59:59.000Z

358

Ice Thermal Storage Systems for Nuclear Power Plant Supplemental Cooling and Peak Power Shifting  

Science Conference Proceedings (OSTI)

Availability of cooling water has been one of the major issues for the nuclear power plant site selection. Cooling water issues have frequently disrupted the normal operation at some nuclear power plants during heat waves and long draught. One potential solution is to use ice thermal storage (ITS) systems that reduce cooling water requirements and boost the plant’s thermal efficiency in hot hours. ITS uses cheap off-peak electricity to make ice and uses the ice for supplemental cooling during peak demand time. ITS also provides a way to shift a large amount of electricity from off peak time to peak time. For once-through cooling plants near a limited water body, adding ITS can bring significant economic benefits and avoid forced derating and shutdown during extremely hot weather. For the new plants using dry cooling towers, adding the ITS systems can effectively reduce the efficiency loss during hot weather so that new plants could be considered in regions lack of cooling water. This paper will review light water reactor cooling issues and present the feasibility study results.

Haihua Zhao; Hongbin Zhang; Phil Sharpe; Blaise Hamanaka; Wei Yan; WoonSeong Jeong

2013-03-01T23:59:59.000Z

359

COOLING WATER ISSUES AND OPPORTUNITIES AT U.S. NUCLEAR POWER PLANTS  

SciTech Connect

This report has been prepared for the Department of Energy, Office of Nuclear Energy (DOE-NE), for the purpose of providing a status report on the challenges and opportunities facing the U.S. commercial nuclear energy industry in the area of plant cooling water supply. The report was prompted in part by recent Second Circuit and Supreme Court decisions regarding cooling water system designs at existing thermo-electric power generating facilities in the U.S. (primarily fossil and nuclear plants). At issue in the courts have been Environmental Protection Agency regulations that define what constitutes “Best Technology Available” for intake structures that withdraw cooling water that is used to transfer and reject heat from the plant’s steam turbine via cooling water systems, while minimizing environmental impacts on aquatic life in nearby water bodies used to supply that cooling water. The report was also prompted by a growing recognition that cooling water availability and societal use conflicts are emerging as strategic energy and environmental issues, and that research and development (R&D) solutions to emerging water shortage issues are needed. In particular, cooling water availability is an important consideration in siting decisions for new nuclear power plants, and is an under-acknowledged issue in evaluating the pros and cons of retrofitting cooling towers at existing nuclear plants. Because of the significant ongoing research on water issues already being performed by industry, the national laboratories and other entities, this report relies heavily on ongoing work. In particular, this report has relied on collaboration with the Electric Power Research Institute (EPRI), including its recent work in the area of EPA regulations governing intake structures in thermoelectric cooling water systems.

Gary Vine

2010-12-01T23:59:59.000Z

360

Online Monitoring of Plant Assets in the Nuclear Industry  

SciTech Connect

Today’s online monitoring technologies provide opportunities to perform predictive and proactive health management of assets within many different industries, in particular the defense and aerospace industries. The nuclear industry can leverage these technologies to enhance safety, productivity, and reliability of the aging fleet of existing nuclear power plants. The U.S. Department of Energy’s Light Water Reactor Sustainability Program is collaborating with the Electric Power Research Institute’s (EPRI’s) Long-Term Operations program to implement online monitoring in existing nuclear power plants. Proactive online monitoring in the nuclear industry is being explored using EPRI’s Fleet-Wide Prognostic and Health Management (FW-PHM) Suite software, a set of web-based diagnostic and prognostic tools and databases that serves as an integrated health monitoring architecture. This paper focuses on development of asset fault signatures used to assess the health status of generator step-up transformers and emergency diesel generators in nuclear power plants. Asset fault signatures describe the distinctive features based on technical examinations that can be used to detect a specific fault type. Fault signatures are developed based on the results of detailed technical research and on the knowledge and experience of technical experts. The Diagnostic Advisor of the FW-PHM Suite software matches developed fault signatures with operational data to provide early identification of critical faults and troubleshooting advice that could be used to distinguish between faults with similar symptoms. This research is important as it will support the automation of predictive online monitoring techniques in nuclear power plants to diagnose incipient faults, perform proactive maintenance, and estimate the remaining useful life of assets.

Nancy Lybeck; Vivek Agarwal; Binh Pham; Richard Rusaw; Randy Bickford

2013-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Waset Isolation Pilot Plant Annual Site Environmental Report for 2006  

Science Conference Proceedings (OSTI)

The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2006 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data that: (a) Characterize site environmental management performance; (b) Summarize environmental occurrences and responses reported during the calendar year; (c) Confirm compliance with environmental standards and requirements; and (d) Highlight significant facility programs and efforts. The DOE Carlsbad Field Office (CBFO) and Washington TRU Solutions LLC (WTS) maintain and preserve the environmental resources at the WIPP site. DOE Order 231.1A; DOE Order 450.1, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and the environment. This report was prepared in accordance with DOE Order 231.1A. This order requires that DOE facilities submit an ASER to the DOE Headquarters Office of the Assistant Secretary for Environment, Safety, and Health. The WIPP Hazardous Waste Facility Permit (HWFP) (No. NM4890139088-TSDF [treatment, storage, and disposal facility]) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

Washington Regulatory and Environmental Services; Washington TRU Solutions LLC

2007-09-26T23:59:59.000Z

362

RADIOLOGICAL EMERGENCY RESPONSE PLANNING FOR NUCLEAR POWER PLANTS IN CALIFORNIA. VOLUME 4 OF THE FINAL REPORT ON HEALTH AND SAFETY IMPACTS OF NUCLEAR, GEOTHERMAL, AND FOSSIL-FUEL ELECTRIC GENERATION IN CALIFORNIA  

E-Print Network (OSTI)

~ ties Surrounding Nuclear Power Plants. LBlr5921, Lawrencein U. S. Commercial Nuclear Power Plants. WASH-1400. Octoberand Content of for Nuclear Power Plants. Regulatory Guide

Yen, W.W.S.

2010-01-01T23:59:59.000Z

363

Energy Praises the Nuclear Regulatory Commission Approval of...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the...

364

Groundwater and Soil Remediation Guidelines for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The Electric Power Research Institute (EPRI) Groundwater and Soil Remediation Guidelines provides the nuclear power industry with technical guidance for evaluating the need for and timing of remediation of soil and/or groundwater contamination from onsite leaks, spills, or inadvertent releases to a) prevent migration of licensed material off-site and b) minimize decommissioning impacts.

2010-12-21T23:59:59.000Z

365

Requirements for advanced simulation of nuclear reactor and chemicalseparation plants.  

SciTech Connect

This report presents requirements for advanced simulation of nuclear reactor and chemical processing plants that are of interest to the Global Nuclear Energy Partnership (GNEP) initiative. Justification for advanced simulation and some examples of grand challenges that will benefit from it are provided. An integrated software tool that has its main components, whenever possible based on first principles, is proposed as possible future approach for dealing with the complex problems linked to the simulation of nuclear reactor and chemical processing plants. The main benefits that are associated with a better integrated simulation have been identified as: a reduction of design margins, a decrease of the number of experiments in support of the design process, a shortening of the developmental design cycle, and a better understanding of the physical phenomena and the related underlying fundamental processes. For each component of the proposed integrated software tool, background information, functional requirements, current tools and approach, and proposed future approaches have been provided. Whenever possible, current uncertainties have been quoted and existing limitations have been presented. Desired target accuracies with associated benefits to the different aspects of the nuclear reactor and chemical processing plants were also given. In many cases the possible gains associated with a better simulation have been identified, quantified, and translated into economical benefits.

Palmiotti, G.; Cahalan, J.; Pfeiffer, P.; Sofu, T.; Taiwo, T.; Wei,T.; Yacout, A.; Yang, W.; Siegel, A.; Insepov, Z.; Anitescu, M.; Hovland,P.; Pereira, C.; Regalbuto, M.; Copple, J.; Willamson, M.

2006-12-11T23:59:59.000Z

366

Survey of nuclear power plant construction costs, 1983  

SciTech Connect

This report presents cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in the construction pipeline, collected on Form EIA-254. The information on US nuclear power plants in the construction pipeline is reported voluntarily each quarter by the electric utilities. This report presents the data collected in the first quarter of 1983 on the 71 nuclear units in the construction pipeline. Historical data on 73 units, totalling 57,287 net megawatts (MWe) of design capacity, in commercial operation as of March 31, 1983, are also given. Three types of information are included: plant characteristics and ownership, construction costs, and construction schedule or chronology. Summary statistics are presented on direct component costs and construction leadtimes for a sample of operating units and units in the construction pipeline. The reactor-specific cost data included in Chapter 4 are the estimated final nuclear production plant costs and, for units in the construction pipeline, the disbursed and sunk costs as of March 31, 1983. 7 figures, 5 tables.

1983-12-01T23:59:59.000Z

367

Indicator system for advanced nuclear plant control complex  

DOE Patents (OSTI)

An advanced control room complex for a nuclear power plant, including a discrete indicator and alarm system (72) which is nuclear qualified for rapid response to changes in plant parameters and a component control system (64) which together provide a discrete monitoring and control capability at a panel (14-22, 26, 28) in the control room (10). A separate data processing system (70), which need not be nuclear qualified, provides integrated and overview information to the control room and to each panel, through CRTs (84) and a large, overhead integrated process status overview board (24). The discrete indicator and alarm system (72) and the data processing system (70) receive inputs from common plant sensors and validate the sensor outputs to arrive at a representative value of the parameter for use by the operator during both normal and accident conditions, thereby avoiding the need for him to assimilate data from each sensor individually. The integrated process status board (24) is at the apex of an information hierarchy that extends through four levels and provides access at each panel to the full display hierarchy. The control room panels are preferably of a modular construction, permitting the definition of inputs and outputs, the man machine interface, and the plant specific algorithms, to proceed in parallel with the fabrication of the panels, the installation of the equipment and the generic testing thereof.

Scarola, Kenneth (Windsor, CT); Jamison, David S. (Windsor, CT); Manazir, Richard M. (North Canton, CT); Rescorl, Robert L. (Vernon, CT); Harmon, Daryl L. (Enfield, CT)

1993-01-01T23:59:59.000Z

368

Plant Support Engineering: Aging Management Program Guidance for Medium- Voltage Cable Systems for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Regulatory and management concern regarding the reliability of medium-voltage cable systems at nuclear plants has been increasing for 5–10 years. The staff of the U.S. Nuclear Regulatory Commission (NRC) are concerned that wetted (up to and including submergence) medium-voltage cable circuits may be degrading to the point at which multiple cable circuits may fail when called on to perform functions affecting safety. Utility managers are concerned that cables may fail, causing adverse safety consequences ...

2010-06-02T23:59:59.000Z

369

DOE Releases Filing Instructions for Federal Risk Insurance for New Nuclear Power Plants  

Energy.gov (U.S. Department of Energy (DOE))

Outlines Five Steps for New Nuclear Plant Sponsors to Enter Into a Conditional Agreement for Risk Insurance

370

Development of Advanced Technologies to Reduce Design, Fabrication and Construction for Future Nuclear Power Plants  

SciTech Connect

OAK-B135 Development of Advanced Technologies to Reduce Design, Fabrication and Construction for Future Nuclear Power Plants

O' Connell, J. Michael

2002-01-01T23:59:59.000Z

371

INFORMATION INTEGRATION IN CONTROL ROOMS AND TECHNICAL OFFICES IN NUCLEAR POWER PLANTS  

E-Print Network (OSTI)

Information integration in control rooms and technical offices in nuclear power plants Report prepared within the framework of the

unknown authors

2001-01-01T23:59:59.000Z

372

Special Nuclear Material Portal Monitoring at the Nevada Test Site  

SciTech Connect

Prior to April 2007, acceptance and performance testing of the various Special Nuclear Material (SNM) monitoring devices at the Nevada Test Site (NTS) was performed by the Radiological Health Instrumentation department. Calibration and performance testing on the PM-700 personnel portal monitor was performed, but there was no test program for the VM-250 vehicle portal monitor. The handheld SNM monitors, the TSA model 470B, were being calibrated annually, but there was no performance test program. In April of 2007, the Material Control and Accountability Manager volunteered to take over performance testing of all SNM portal monitors at NTS in order to strengthen the program and meet U.S. Department of Energy Order requirements. This paper will discuss the following activities associated with developing a performance testing program: changing the culture, learning the systems, developing and implementing procedures, troubleshooting and repair, validating the process, physical control of equipment, acquisition of new systems, and implementing the performance test program.

DeAnn Long; Michael Murphy

2008-07-01T23:59:59.000Z

373

Plant Engineering: Electrical Cable Test Applicability Matrix for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

When assessing cable degradation or failure assessment, using the correct test and assessment methodology is critical to obtaining the correct answer. Many in-plant and laboratory tests exist. Some apply to the cable types used in nuclear plants. Some apply only to distribution cables. Most have pertinence to only one issue or even one cable design. This report provides a correlation between specific cable problems and the appropriate tests that may be used to resolve the issue. The report starts with su...

2011-12-23T23:59:59.000Z

374

Management of Hanford Site non-defense production reactor spent nuclear fuel, Hanford Site, Richland, Washington  

SciTech Connect

The US Department of Energy (DOE) needs to provide radiologically, and industrially safe and cost-effective management of the non-defense production reactor spent nuclear fuel (SNF) at the Hanford Site. The proposed action would place the Hanford Site`s non-defense production reactor SNF in a radiologically- and industrially-safe, and passive storage condition pending final disposition. The proposed action would also reduce operational costs associated with storage of the non-defense production reactor SNF through consolidation of the SNF and through use of passive rather than active storage systems. Environmental, safety and health vulnerabilities associated with existing non-defense production reactor SNF storage facilities have been identified. DOE has determined that additional activities are required to consolidate non-defense production reactor SNF management activities at the Hanford Site, including cost-effective and safe interim storage, prior to final disposition, to enable deactivation of facilities where the SNF is now stored. Cost-effectiveness would be realized: through reduced operational costs associated with passive rather than active storage systems; removal of SNF from areas undergoing deactivation as part of the Hanford Site remediation effort; and eliminating the need to duplicate future transloading facilities at the 200 and 400 Areas. Radiologically- and industrially-safe storage would be enhanced through: (1) removal from aging facilities requiring substantial upgrades to continue safe storage; (2) utilization of passive rather than active storage systems for SNF; and (3) removal of SNF from some storage containers which have a limited remaining design life. No substantial increase in Hanford Site environmental impacts would be expected from the proposed action. Environmental impacts from postulated accident scenarios also were evaluated, and indicated that the risks associated with the proposed action would be small.

1997-03-01T23:59:59.000Z

375

Next Generation Nuclear Plant Materials Selection and Qualification Program Plan  

SciTech Connect

The U.S. Department of Energy (DOE) has selected the Very High Temperature Reactor (VHTR) design for the Next Generation Nuclear Plant (NGNP) Project. The NGNP will demonstrate the use of nuclear power for electricity and hydrogen production without greenhouse gas emissions. The reactor design is a graphite-moderated, helium-cooled, prismatic or pebble bed thermal neutron spectrum reactor with an average reactor outlet temperature of at least 1000 C. The NGNP will use very high burn up, lowenriched uranium, TRISO-Coated fuel in a once-through fuel cycle. The design service life of the NGNP is 60 years.

R. Doug Hamelin; G. O. Hayner

2004-11-01T23:59:59.000Z

376

GRR/Section 7 - Power Plant Siting, Construction, and Regulation Overview |  

Open Energy Info (EERE)

GRR/Section 7 - Power Plant Siting, Construction, and Regulation Overview GRR/Section 7 - Power Plant Siting, Construction, and Regulation Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7 - Power Plant Siting, Construction, and Regulation Overview 07PowerPlantSitingConstructionOverview (2).pdf Click to View Fullscreen Contact Agencies Federal Energy Regulatory Commission Triggers None specified Click "Edit With Form" above to add content 07PowerPlantSitingConstructionOverview (2).pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative The power plant's location, size, type of customer the power plant sells energy to, and whether the power plant sells energy in "interstate

377

Requirements for Advanced Simulation of Nuclear Reactor and Chemical Separation Plants  

E-Print Network (OSTI)

Requirements for Advanced Simulation of Nuclear Reactor and Chemical Separation Plants ANL-AFCI-168 of Nuclear Reactor and Chemical Separation Plants ANL-AFCI-168 by G. Palmiotti, J. Cahalan, P. Pfeiffer, T;2 ANL-AFCI-168 Requirements for Advanced Simulation of Nuclear Reactor and Chemical Separation Plants G

Anitescu, Mihai

378

Vulnerability Analysis of a Nuclear Power Plant Considering Detonations of Explosive Devices  

E-Print Network (OSTI)

Vulnerability Analysis of a Nuclear Power Plant Considering Detonations of Explosive Devices Marko threats to a nuclear power plant in the year 1991 and after the 9/11 events in 2001. The methodology which strength and injuries of human beings with nuclear power plant models used in probabilistic safety

Cizelj, Leon

379

Waste Isolation Pilot Plant Annual Site Environmental Report for 2010  

Science Conference Proceedings (OSTI)

The purpose of the Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data to: (1) Characterize site environmental management performance. (2) Summarize environmental occurrences and responses reported during the calendar year. (3) Confirm compliance with environmental standards and requirements. (4) Highlight significant environmental accomplishments, including progress toward the DOE Environmental Sustainability Goals made through implementation of the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the WIPP. DOE Order 231.1A; DOE Order 450.1A, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and workers, and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit Number NM4890139088-TSDF (Permit) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

None

2011-09-01T23:59:59.000Z

380

U.S. Nuclear Power Plants: Continued Life or Replacement After 60? (released in AEO2010)  

Reports and Publications (EIA)

Nuclear power plants generate approximately 20 percent of U.S. electricity, and the plants in operation today are often seen as attractive assets in the current environment of uncertainty about future fossil fuel prices, high construction costs for new power plants (particularly nuclear plants), and the potential enactment of GHG regulations. Existing nuclear power plants have low fuel costs and relatively high power output. However, there is uncertainty about how long they will be allowed to continue operating.

Information Center

2010-05-11T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Advanced Nuclear Technology: Supplier Quality Management for New Nuclear Plant Construction Projects  

Science Conference Proceedings (OSTI)

This report provides guidance for new nuclear power plant construction projects on supplier quality-related risks associated with the procurement of materials, equipment, and services intended for use in a safety-related plant application. This guidance takes an in-depth look into the procurement-related challenges that new construction projects face and at measures for overcoming these challenges. A methodology is provided for identifying, managing, evaluating, and mitigating quality-related risks ...

2013-06-26T23:59:59.000Z

382

Nuclear Maintenance Applications Center: Passive Component Maintenance Guide for Nuclear Power Plant Personnel  

Science Conference Proceedings (OSTI)

The information contained in this report represents a significant collection of technical and human performance information, including techniques and good practices, related to the design, maintenance, and operation of passive components common at most domestic nuclear power plants. Assemblage of this information provides a single point of reference for plant engineering and maintenance personnel, both in the present and in the future. Through the use of this guideline, in close conjunction with the indu...

2011-11-16T23:59:59.000Z

383

Design and construction of the Qinshan nuclear power plant  

Science Conference Proceedings (OSTI)

The construction work of China's first prototype nuclear power plant Qinshan NPP has already begun. This plant is located on the northern shore of Hangzhou Bay. It is designed to have a capacity of 300 MW electricity. The thermal power of the reactor is 966 MW. The primary circuit consists of 2 coolant loops and 16 auxiliary systems for normal operation. Safety is always the priority in design consideration. Preliminary safety analyses have been done and satisfactory results have been obtained. Excavation and clean out work has been finished.

Yu, O.

1985-01-01T23:59:59.000Z

384

June 28, 2005 France to Be Site of World's First Nuclear Fusion Reactor  

E-Print Network (OSTI)

June 28, 2005 France to Be Site of World's First Nuclear Fusion Reactor By CRAIG S. SMITH PARIS the reactor in the southern French city of Cadarache. Nuclear fusion is the process by which the atomic nuclei than burning fossil fuels or even nuclear fission, which is used in nuclear reactors today but produces

385

Effects of delaying the operation of a nuclear power plant  

Science Conference Proceedings (OSTI)

This report documents a study of an actual 24-month nuclear power plant licensing delay. A representative utility was chosen for examination. The research was oriented toward determination of the licensing delay's impact on the utility's operating results, ratepayers, and security issues. The methodology utilized to estimate those impacts involved the recursive interaction of a generation costing program to estimate replacement fuel costs and a financial regulatory model to concomitantly determine the impact on the utility, its ratepayers and security issues. The latter model was executed under six alternate scenarios: (1) no delay in the plant's operation; (2) a 24-month delay; (3) a 24-month delay but further assuming all replacement power was generated by coal-fired plants; (4) a 24-month delay assuming all replacement power from oil-fired plants; (5) no delay but assuming the capital cost of the plant was twice as large; and (6) a 24-month delay with the capital cost of the plant twice as large. Three primary conclusions were made. First, under all scenarios, a 24-month delay in operation of the plant has an adverse impact on the utility's internal generation of funds. Second, although electricity rates are not appreciably affected by the delay, the direction of electricity price changes is contingent on the source of fuel used for replacement power. Finally, a 24-month delay has an adverse impact on the indicators used to evaluate the financial soundness of the utility in all cases under consideration.

Hill, L.J.; Rainey, J.A.; Tepel, R.C.; Van Dyke, J.W.

1983-12-01T23:59:59.000Z

386

Young Professionals in Nuclear Industry Group Forms at Savannah River Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Young Professionals in Nuclear Industry Group Forms at Savannah Young Professionals in Nuclear Industry Group Forms at Savannah River Site Young Professionals in Nuclear Industry Group Forms at Savannah River Site January 1, 2012 - 12:00pm Addthis The Savannah River Chapter of North American – Young Generation in Nuclear is a new group forming at the Savannah River Site. The Savannah River Chapter of North American - Young Generation in Nuclear is a new group forming at the Savannah River Site. AIKEN, S.C. - Supporting the development of young nuclear professionals in the Central Savannah River Area (CSRA) is the purpose behind a new group forming at the Savannah River Site (SRS). The Savannah River Chapter of North American - Young Generation in Nuclear (SR-YGN) will hold a kick-off meeting Jan. 26 in Aiken and all

387

Human Factors Considerations in New Nuclear Power Plants: Detailed Analysis.  

Science Conference Proceedings (OSTI)

This Nuclear Regulatory Commission (NRC) sponsored study has identified human-performance issues in new and advanced nuclear power plants. To identify the issues, current industry developments and trends were evaluated in the areas of reactor technology, instrumentation and control technology, human-system integration technology, and human factors engineering (HFE) methods and tools. The issues were organized into seven high-level HFE topic areas: Role of Personnel and Automation, Staffing and Training, Normal Operations Management, Disturbance and Emergency Management, Maintenance and Change Management, Plant Design and Construction, and HFE Methods and Tools. The issues where then prioritized into four categories using a 'Phenomena Identification and Ranking Table' methodology based on evaluations provided by 14 independent subject matter experts. The subject matter experts were knowledgeable in a variety of disciplines. Vendors, utilities, research organizations and regulators all participated. Twenty issues were categorized into the top priority category. This Brookhaven National Laboratory (BNL) technical report provides the detailed methodology, issue analysis, and results. A summary of the results of this study can be found in NUREG/CR-6947. The research performed for this project has identified a large number of human-performance issues for new control stations and new nuclear power plant designs. The information gathered in this project can serve as input to the development of a long-term strategy and plan for addressing human performance in these areas through regulatory research. Addressing human-performance issues will provide the technical basis from which regulatory review guidance can be developed to meet these challenges. The availability of this review guidance will help set clear expectations for how the NRC staff will evaluate new designs, reduce regulatory uncertainty, and provide a well-defined path to new nuclear power plant licensing.

OHara,J.; Higgins, J.; Brown, W.; Fink, R.

2008-02-14T23:59:59.000Z

388

Optimization of Fire Protection Impairments at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

In recent years, risk-informed and performance-based (RI/PB) fire protection is gaining further acceptance by the Nuclear Regulatory Commission (NRC) and the industry. In addition, fire risk assessment methods are gaining some level of maturity since the first industrywide experience with individual plant examination for external events (IPEEE). RI/PB methods can reduce the cost of operating fire protection programs and maintaining fire safety.

2006-08-07T23:59:59.000Z

389

Predictive Maintenance Self-Assessment Guidelines for Nuclear Power Plants  

Science Conference Proceedings (OSTI)

There is a need at nuclear power plants for optimization and continuous improvement in the predictive maintenance (PdM) process. This need is based upon increased reliance on PdM to contribute to low unplanned capability loss factors, prevent significant equipment failures, reduce resources for maintenance, manage assets in support of license renewal and aging control, incorporate new technologies and advanced information management, and manage the risk associated with maintenance activities. This docume...

2000-11-28T23:59:59.000Z

390

Introduction to Nuclear Plant Steam Turbine Control Systems  

Science Conference Proceedings (OSTI)

Since Nuclear Power Plants produce their power through the use of Steam Turbine Generators, any problems associated with the Turbine Control System has a direct effect on power generation. Although considerable effort has been expended in improving control system reliability, failures resulting in lost generation and high maintenance cost still plague the industry. On an individual basis, improvements have been made through maintenance techniques, modifications and upgrades. Unfortunately, this informati...

1995-03-02T23:59:59.000Z

391

Understanding seismic design criteria for Japanese nuclear power plants  

SciTech Connect

This paper summarizes the results of recent survey studies on the seismic design practice for nuclear power plants in Japan. The seismic design codes and standards for both nuclear as well as non-nuclear structures have been reviewed and summarized. Some key documents for understanding Japanese seismic design criteria are also listed with brief descriptions. The paper highlights the design criteria to determine the seismic demand and component capacity in comparison with US criteria, the background studies which have led to the current Japanese design criteria, and a survey of current research activities. More detailed technical descriptions are presented on the development of Japanese shear wall equations, design requirements for containment structures, and ductility requirements.

Park, Y.J.; Hofmayer, C.H. [Brookhaven National Lab., Upton, NY (United States); Costello, J.F. [US Nuclear Regulatory Commission, Washington, DC (United States)

1994-12-31T23:59:59.000Z

392

Hydrogen Production from the Next Generation Nuclear Plant  

DOE Green Energy (OSTI)

The Next Generation Nuclear Plant (NGNP) is a high temperature gas-cooled reactor that will be capable of producing hydrogen, electricity and/or high temperature process heat for industrial use. The project has initiated the conceptual design phase and when completed will demonstrate the viability of hydrogen generation using nuclear produced process heat. This paper explains how industry and the U.S. Government are cooperating to advance nuclear hydrogen technology. It also describes the issues being explored and the results of recent R&D including materials development and testing, thermal-fluids research, and systems analysis. The paper also describes the hydrogen production technologies being considered (including various thermochemical processes and high-temperature electrolysis).

M. Patterson; C. Park

2008-03-01T23:59:59.000Z

393

Idaho Site Taps Old World Process to Treat Nuclear Waste | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Site Taps Old World Process to Treat Nuclear Waste Idaho Site Taps Old World Process to Treat Nuclear Waste Idaho Site Taps Old World Process to Treat Nuclear Waste September 9, 2013 - 12:00pm Addthis The Idaho site's sodium distillation system. The Idaho site's sodium distillation system. The top of a sodium distillation vessel, where waste enters the system. The top of a sodium distillation vessel, where waste enters the system. The Idaho site's sodium distillation system. The top of a sodium distillation vessel, where waste enters the system. IDAHO FALLS, Idaho - The EM program at the Idaho site is using an age-old process to treat transuranic (TRU) waste left over from nuclear reactor experiments. Developed in the first century and perfected by moonshiners in the 19th century, distillation will be used at the Idaho Nuclear Technology and

394

Conceivable new recycling of nuclear waste by nuclear power companies in their plants  

E-Print Network (OSTI)

We outline the basic principles and the needed experiments for a conceivable new recycling of nuclear waste by the power plants themselves to avoid its transportation and storage to a (yet unknown) dumping area. Details are provided in an adjoining paper and in patents pending.

Ruggero Maria Santilli

1997-04-09T23:59:59.000Z

395

AN ADVANCED SODIUM-GRAPHITE REACTOR NUCLEAR POWER PLANT  

SciTech Connect

An advanced sodium-cooled, graphite-moderated nuclear power plant is described which utilizes high-pressure, high-temperature steam to generate electricity at a high thermal efficiency. Steam is generated at 2400 psig, superheated to 1050 deg F and, after partial expansion in the turbine, reheated to 1000 deg F. Net thermal efficiency of the plant is 42.3%. In a plant sized to produce a net electrical output of 256 Mw, the estimated cost is 8232/kw. Estimated cost of power generation is 6.7 mills/kwh. In a similar plant with a net electrical output of 530 Mw, the estimated power generating cost is 5.4 mills/ kwh. Most of the components of the plant are within the capability of current technology. The major exception is the fuel material, uranium carbide. Preliminary results of the development work now in progress indicate that uranium carbide would be an excellent fuel for high-temperature reactors, but temperature and burnup limitation have yet to be firmly established. Additional development work is also required on the steam generators. These are the single-barrier type similar to those which will be used in the Enrico Fernri Fast Breeder Reactor plant but produce steam at higher pressure and temperature. Questions also remain regarding the use of nitrogen as a cover gas over sodium at 1200 deg F and compatibility of the materials used in the primary neutron shield. All of these questions are currently under investigation. (auth)

Churchill, J.R.; Renard, J.

1960-03-15T23:59:59.000Z

396

NEXT GENERATION NUCLEAR PLANT LICENSING BASIS EVENT SELECTION WHITE PAPER  

SciTech Connect

The Next Generation Nuclear Plant (NGNP) will be a licensed commercial high temperature gas-cooled reactor (HTGR) plant capable of producing the electricity and high temperature process heat for industrial markets supporting a range of end-user applications. The NGNP Project has adopted the 10 CFR 52 Combined License (COL) application process, as recommended in the Report to Congress, dated August 2008, as the foundation for the NGNP licensing strategy. NRC licensing of the NGNP plant utilizing this process will demonstrate the efficacy of licensing future HTGRs for commercial industrial applications. This white paper is one in a series of submittals that will address key generic issues of the COL priority licensing topics as part of the process for establishing HTGR regulatory requirements.

Mark Holbrook

2010-09-01T23:59:59.000Z

397

Guide for monitoring equipment environments during nuclear plant operation  

Science Conference Proceedings (OSTI)

This guide is intended to assist utilities in formulating and implementing improved monitoring programs by providing guidance on why, where and how to track environmental conditions such as temperature, radiation, and humidity for equipment in nuclear power plants during operation. The guide describes steps for implementing programs. It also gives advantages, disadvantages and costs for a variety of monitoring methods and devices such as sensors with recording devices, thermographic surveys, and passive thermal and radiation integrating devices. The guide also contains twenty technical papers presented at an environmental monitoring workshop covering the subjects of plant experience with elevated temperatures, plant environmental monitoring programs, and techniques for monitoring temperature and radiation. These individual papers have been cataloged separately.

Danahy, J.W.; Evans, R.W. (Grove Engineering, Inc., Rockville, MD (United States))

1991-06-01T23:59:59.000Z

398

Aging management guideline for commercial nuclear power plants-pumps  

SciTech Connect

This Aging Management Guideline (AMG) describes recommended methods for effective detection and mitigation of age-related degradation mechanisms in BWR and PWR commercial nuclear power plant pumps important to license renewal. The intent of this AMG is to assist plant maintenance and operations personnel in maximizing the safe, useful life of these components. It also supports the documentation of effective aging management programs required under the License Renewal Rule 10 CFR Part 54. This AMG is presented in a manner that allows personnel responsible for performance analysis and maintenance to compare their plant-specific aging mechanisms (expected or already experienced) and aging management program activities to the more generic results and recommendations presented herein.

Booker, S.; Katz, D.; Daavettila, N.; Lehnert, D. [MDC-Ogden Environmental and Energy Services, Southfield, MI (United States)

1994-03-01T23:59:59.000Z

399

RADIOLOGICAL EMERGENCY RESPONSE PLANNING FOR NUCLEAR POWER PLANTS IN CALIFORNIA. VOLUME 4 OF THE FINAL REPORT ON HEALTH AND SAFETY IMPACTS OF NUCLEAR, GEOTHERMAL, AND FOSSIL-FUEL ELECTRIC GENERATION IN CALIFORNIA  

E-Print Network (OSTI)

population growth surrounding a nuclear power plant once thegrowth by requiring that certification of nuclear power plant

Yen, W.W.S.

2010-01-01T23:59:59.000Z

400

Nevada National Security Site Nuclear Testing Artifacts Become Part of U.S.  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada National Security Site Nuclear Testing Artifacts Become Part Nevada National Security Site Nuclear Testing Artifacts Become Part of U.S. Cultural Archive Nevada National Security Site Nuclear Testing Artifacts Become Part of U.S. Cultural Archive April 1, 2012 - 12:00pm Addthis Stanchions are among the remnants of Smoky Tower. Stanchions are among the remnants of Smoky Tower. LAS VEGAS, NV - The Nevada National Security Site's (NNSS) historic Smoky site may soon join a long list of former nuclear testing locations eligible for inclusion in the National Register of Historic Places. The Desert Research Institute (DRI) is currently working alongside the Nevada Site Office (NSO) to determine the eligibility of Smoky and a number of other EM sites slated for cleanup and closure. "In the last year, we've conducted assessments at over 30 EM sites,"

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

GRR/Section 7 - Power Plant Siting/Construction Overview | Open...  

Open Energy Info (EERE)

with form History Share this page on Facebook icon Twitter icon GRRSection 7 - Power Plant SitingConstruction Overview < GRR Jump to: navigation, search GRR-logo.png...

402

Incentive regulation of nuclear power plants by state regulators  

Science Conference Proceedings (OSTI)

The Nuclear Regulatory Commission (NRC) monitors incentive programs established by state regulators in order to obtain current information and to consider the potential safety effects of the incentive programs as applied to nuclear units. The current report is an update of NUREG/CR-5509, Incentive Regulation of Nuclear Power Plants by State Public Utility Commissions, published in December 1989. The information in this report was obtained from interviews conducted with each state regulator and each utility with a minimum entitlement of 10%. The agreements, orders, and settlements from which each incentive program was implemented were reviewed as required. The interviews and supporting documentation form the basis for the individual state reports describing the structure and financial impact of each incentive program. The programs currently in effect represent the adoption of an existing nuclear performance incentive program proposal and one new program. In addition, since 1989 a number of nuclear units have been included in one existing program; while one program was discontinued and another one concluded. 6 refs., 27 tabs.

Martin, R.L.; Baker, K.; Olson, J. (Battelle Human Affairs Research Center, Seattle, WA (USA))

1991-02-01T23:59:59.000Z

403

Hanford Site Rare Plant Monitoring Report for Calendar Year 2012  

SciTech Connect

Two patches of Columbian yellowcress on the Hanford Reach were visited in both 2011 and 2012 to compare ramet counts between years: near Allerd Pumphouse (Rkm 615.4) and near White Bluffs Boat Launch (Rkm 593.3) (Figure 3). In 2012, the population near Allerd Pumphouse had 45 ramets present within a 5x3 m area. At the same population in 2011, there were 60 ramets. In 2012, the population near White Bluffs Boat Launch had 105 ramets in a 2x2 m area. At the same population in 2011, there were 100 ramets. This data shows that while annual variability does exist, ramet counts were relatively similar from 2011 to 2012. This is likely due to the similar flow regimes of 2011 and 2012, which both had above average snowpack, high flows, and extended spring flooding seasons. A total of 19.6 miles (31.5 km) of the Hanford shoreline were surveyed in 2012, with ten patches identified and approximately 1,250 ramets counted. It is not known how many individual plants this count represents due to the rhizomatous nature of the species. Two of these sites were identified previously in the WNHP database, and the remaining eight were newly identified locations. Eleven of the ramets had flowers and/or buds in the patches located during 2012, but no fruits were found

Salstrom, D; Easterly, R; Lindsey, Cole T.; Nugent, John J.

2013-03-21T23:59:59.000Z

404

RADIOLOGICAL HEALTH AND RELATED STANDARDS FOR NUCLEAR POWER PLANTS. VOLUME 2 OF HEALTH AND SAFETY IMPACTS OF NUCLEAR, GEOTHERMAL, AND FOSSIL-FUEL ELECTRIC GENERATION IN CALIFORNIA  

E-Print Network (OSTI)

Report LBL-5287. "Power Plant Reliability-Availability andConunercial Nuclear Power Plants", Report WASH-1400 (NUREG-Standards for Nuclear Power Plants," by A.V. Nero and Y.C.

Nero, A.V.

2010-01-01T23:59:59.000Z

405

Preliminary Evaluation of Removing Used Nuclear Fuel From Nine Shutdown Sites  

SciTech Connect

he Blue Ribbon Commission on America’s Nuclear Future identified removal of stranded used nuclear fuel at shutdown sites as a priority so that these sites may be completely decommissioned and put to other beneficial uses. In this report, a preliminary evaluation of removing used nuclear fuel from nine shutdown sites was conducted. The shutdown sites included Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion. At these sites a total of 7649 used nuclear fuel assemblies and a total of 2813.2 metric tons heavy metal (MTHM) of used nuclear fuel are contained in 248 storage canisters. In addition, 11 canisters containing greater-than-Class C (GTCC) low-level radioactive waste are stored at these sites. The evaluation was divided in four components: • characterization of the used nuclear fuel and GTCC low-level radioactive waste inventory at the shutdown sites • an evaluation of the onsite transportation conditions at the shutdown sites • an evaluation of the near-site transportation infrastructure and experience relevant to the shipping of transportation casks containing used nuclear fuel from the shutdown sites • an evaluation of the actions necessary to prepare for and remove used nuclear fuel and GTCC low-level radioactive waste from the shutdown sites. Using these evaluations the authors developed time sequences of activities and time durations for removing the used nuclear fuel and GTCC low-level radioactive waste from a single shutdown site, from three shutdown sites located close to each other, and from all nine shutdown sites.

Maheras, Steven J.; Best, Ralph; Ross, Steven B.; Buxton, Kenneth A.; England, Jeffery L.; McConnell, Paul

2013-04-30T23:59:59.000Z

406

DOE/WIPP-10-2225 Waste Isolation Pilot Plant Annual Site Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

WIPP-10-2225 WIPP-10-2225 Waste Isolation Pilot Plant Annual Site Environmental Report for 2009 Errata U.S. Department of Energy September 2010 2 Waste Isolation Pilot Plant Annual Site Environmental Report for 2009 DOE/WIPP-10-2225 3 2009 Annual Site Environmental Report To our readers: This Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2009 presents summary environmental data to (1) characterize site environmental management performance, (2) summarize environmental occurrences and responses reported during the calendar year, (3) confirm compliance with environmental standards and requirements, and (4) highlight the WIPP Environmental Management System (EMS), significant environmental programs, and accomplishments including progress toward the

407

Nuclear criticality project plan for the Hanford Site tank farms  

SciTech Connect

The mission of this project is to provide a defensible technical basis report in support of the Final Safety Analysis Report (FSAR). This technical basis report will also be used to resolve technical issues associated with the nuclear criticality safety issue. The strategy presented in this project plan includes an integrated programmatic and organizational approach. The scope of this project plan includes the provision of a criticality technical basis supporting document (CTBSD) to support the FSAR as well as for resolution of the nuclear criticality safety issue. Specifically, the CTBSD provides the requisite technical analysis to support the FSAR hazard and accident analysis as well as for the determination of the required FSAR limits and controls. The scope of The CTBSD will provide a baseline for understanding waste partitioning and distribution phenomena and mechanistics for current operational activities inclusive of single-shell tanks, double-shell tanks, double-contained receiver tanks, and miscellaneous underground storage tanks.. Although the FSAR does not include future operational activities, the waste partitioning and distribution phenomena and mechanistics work scope identified in this project plan provide a sound technical basis as a point of departure to support independent safety analyses for future activities. The CTBSD also provides the technical basis for resolution of the technical issues associated with the nuclear criticality safety issue. In addition to the CTBSD, additional documentation will be required to fully resolve U.S. Department of Energy-Headquarters administrative and programmatic issues. The strategy and activities defined in this project plan provide a CTBSD for the FSAR and for accelerated resolution of the safety issue in FY 1996. On April 30, 1992, a plant review committee reviewed the Final Safety Analysis Reports for the single-shell, double-shell, and aging waste tanks in light of the conclusions of the inadequate waste characterization with respect to fissile material. The review indicated that the conclusion in the FSARS, that a criticality is not credible, cannot be supported for a full range of potential tank constituents. Therefore, a USQ was declared. Development of a credible scenario leading to a criticality proved to be extremely difficult, given the paucity of data on the quantity and distribution of fissile material in the tanks. The objective of this project plan is to develop a strategy and technical approach to provide a CTBSD for the FSAR and for resolution of the nuclear criticality safety issue pertaining to tank farm waste storage and transfer operations. The strategy and technical approach identified in this project plan include definition of administrative and technical tasks. Technical analyses will include mechanistic studies, historical data review, and additional limited neutronics analysis. Completion of these studies will be documented in a CTBSD to support the existing criticality technical basis. The CTBSD will be incorporated in the criticality portion of the FSAR.

Bratzel, D.R., Westinghouse Hanford

1996-08-06T23:59:59.000Z

408

Special Nuclear Material Portal Monitoring at the Nevada Test Site  

SciTech Connect

In the past, acceptance and performance testing of the various Special Nuclear Material (SNM) monitoring devices at the Nevada Test Site has been performed by the Radiological Health Instrumentation Department. Calibration and performance tests on the PM-700 personnel portal monitor were performed but there was no test program for the VM-250 vehicle portal monitor because it had never been put into service. The handheld SNM monitors, the TSA model 470B, were being calibrated annually, but there was no program in place to test them quarterly. In April of 2007, the Material Control and Accountability (MC&A) Manager at the time decided that the program needed to be strengthened and MC&A took over performance testing of all SNM portal monitoring equipment. This paper will discuss the following activities associated with creating a performance testing program: changing the culture, learning the systems, writing procedures, troubleshooting/repairing, validating the process, control of equipment, acquisition of new systems, and running the program.

Mike Murphy

2008-03-01T23:59:59.000Z

409

Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 2  

Science Conference Proceedings (OSTI)

The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site; to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. Chapter 3 summarizes present knowledge of the regional and site hydrologic systems. The purpose of the information presented is to (1) describe the hydrology based on available literature and preliminary site-exploration activities that have been or are being performed and (2) provide information to be used to develop the hydrologic aspects of the planned site characterization program. Chapter 4 contains geochemical information about the Yucca Mountain site. The chapter references plan for continued collection of geochemical data as a part of the site characterization program. Chapter 4 describes and evaluates data on the existing climate and site meterology, and outlines the suggested procedures to be used in developing and validating methods to predict future climatic variation. 534 refs., 100 figs., 72 tabs.

NONE

1988-01-01T23:59:59.000Z

410

Mercury-Free Dissolution of Aluminum-Based Nuclear Material: From Basic Science to the Plant  

Science Conference Proceedings (OSTI)

Conditions were optimized for the first plant-scale dissolution of an aluminum-containing nuclear material without using mercury as a catalyst. This nuclear material was a homogeneous mixture of plutonium oxide and aluminum metal that had been compounded for use as the core matrix in Mark 42 nuclear fuel. Because this material had later failed plutonium distribution specifications, it was rejected for use in the fabrication of Mark 42 fuel tubes, and was stored at the Savannah River Site (SRS) awaiting disposition. This powder-like material was composed of a mixture of approximately 80 percent aluminum and 11 percent plutonium. Historically, aluminum-clad spent nuclear fuels [13] have been dissolved using a mercuric nitrate catalyst in a nitric acid (HNO3) solution to facilitate the dissolution of the bulk aluminum cladding. Developmental work at SRS indicated that the plutonium oxide/aluminum compounded matrix could be dissolved without mercury. Various mercury-free conditions were studied to evaluate the rate of dissolution of the Mark 42 compact material and to assess the corrosion rate to the stainless steel dissolver. The elimination of mercury from the dissolution process fit with waste minimization and industrial hygiene goals to reduce the use of mercury in the United States. The mercury-free dissolution technology was optimized for Mark 42 compact material in laboratory-scale tests, and successfully implemented at the plant.

Crooks, W.J. III

2003-05-14T23:59:59.000Z

411

2011 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant  

SciTech Connect

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant from November 1, 2010, through October 31, 2011. The report contains the following information: (1) Site description; (2) Facility and system description; (3) Permit required monitoring data and loading rates; (4) Status of special compliance conditions and activities; and (5) Discussion of the facility's environmental impacts. During the 2011 permit year, approximately 1.22 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Area Sewage Treatment plant.

Michael G. Lewis

2012-02-01T23:59:59.000Z

412

RECORD OF CATEGORICAL EXCLUSION (CX) DETERMINATION I National Nuclear Security Administration/Kansas City Site Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I I National Nuclear Security Administration/Kansas City Site Office A. Description of Proposed Action: (lor 2 sentences; include title, general activities, location, timeframe) Kansas City Plant -Routine Operating and Administrative Activities (ROAA) - NCR KCPIO·07: NEPA action levels for planned changes as defined in the FY2011 Health Safety & Environment Management System Description and Worker Safety & Health Program document, Section 7,0 Work Planning and Control, signed 9/212010. October 2010 thru September 201 1. B. Number and Title of the Categorical Exclusion Being Applied: (See text in 10 CPR 1021, Subpart D.) Multiple, which could include but not limited to: A7-A9, All, B1.3, B1.23, B1.3l as listed in Table 3.b of the document

413

RECORD OF CATEGORICAL EXCLUSION (CX) DETERMINATION' National Nuclear Security Administration/Kansas City Site Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DETERMINATION' DETERMINATION' National Nuclear Security Administration/Kansas City Site Office A. Description of Proposed Action: (lor 2 sentences; include title, general activities, location, timeframe) Kansas City Plant - Project 1712 Repair OF002 CIPP Liner Near AICO Inlet: repair Outfall No. 002 using an open cut replacement of the southern section, a slip lining of the northern section, and a manhole placed at the intersection of those sections. October 2010 thru April 201 1. B. Number and Title of the Categorical Exclusion Being Applied: (See text in 10 CFR 1021, Subpart D.) B6.1 Small scale, short term cleanup actions under RCRA, Atomic Energy Act, or other authorities C. Regulatory Requirements in 10CFR 1021.410 (b): (See full text in regulation.) (1) The proposed action fits within a class of actions that is listed in Appendix A or B to Subpart D.

414

RECORD OF CATEGORICAL EXCLUSION (CX) DETERMINATION! National Nuclear Security Administration/Kansas City Site Office  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DETERMINATION! DETERMINATION! National Nuclear Security Administration/Kansas City Site Office A. Description of Proposed Action: (lor 2 sentences; include title, general activities, location, timeframe) Kansas City Plant - Project 1615 - Building 16 PCB Decontamination: Areas within Building 16 that exhibit PCB contamination above the 10 ug/l00cm2 exposure threshold, as defined by the Toxic Substances Control Act (TSCA) (40 CFR Part 761), would be addressed under this project. February 2014 thru September 2014. B. Number and Title of the Categorical Exclusion Being Applied: (See text in 10 CFR 1021, Subpart D.) B 1.17 - Removal of polychlorinated biphenyl-containing items from buildings, other above ground locations. C. Regulatory Requirements in 10 CFR 1021.410 (b): (See full text in regulation.)

415

Knowledge and abilities catalog for nuclear power plant operators: Boiling water reactors, Revision 1  

SciTech Connect

The Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling-Water Reactors (BWRs) (NUREG-1123, Revision 1) provides the basis for the development of content-valid licensing examinations for reactor operators (ROs) and senior reactor operators (SROs). The examinations developed using the BWR Catalog along with the Operator Licensing Examiner Standards (NUREG-1021) and the Examiner`s Handbook for Developing Operator Licensing Written Examinations (NUREG/BR-0122), will cover the topics listed under Title 10, Code of Federal Regulations, Part 55 (10 CFR 55). The BWR Catalog contains approximately 7,000 knowledge and ability (K/A) statements for ROs and SROs at BWRs. The catalog is organized into six major sections: Organization of the Catalog, Generic Knowledge and Ability Statements, Plant Systems grouped by Safety Functions, Emergency and Abnormal Plant Evolutions, Components, and Theory. Revision 1 to the BWR Catalog represents a modification in form and content of the original catalog. The K/As were linked to their applicable 10 CFR 55 item numbers. SRO level K/As were identified by 10 CFR 55.43 item numbers. The plant-wide generic and system generic K/As were combined in one section with approximately one hundred new K/As. Component Cooling Water and Instrument Air Systems were added to the Systems Section. Finally, High Containment Hydrogen Concentration and Plant Fire On Site evolutions added to the Emergency and Abnormal Plant Evolutions section.

NONE

1995-08-01T23:59:59.000Z

416

(Safety and reliability of nuclear power plant technology)  

SciTech Connect

The traveler attended the 16th MPA Seminar on the Safety and Reliability of Plant Technology with Special Emphasis on Nuclear Technology. The objective of the trip was to gather information and data that could prove useful to the US Nuclear Regulatory Commission (USNRC) sponsored Heavy-Section Steel Irradiation (HSSI) and Heavy-Section Steel Technology (HSST) Programs and to present a paper entitled, Effects of Irradiation on Initiation and Crack-Arrest Toughness of Two High-Copper Welds and on Stainless Steel Cladding. This paper summarizes results from the 5th, 6th, and 7th Irradiation Series of experiments performed within the HSSI Program by the Metals and Ceramics Division at Oak Ridge National Laboratory (ORNL).

Dickson, T.L.

1990-10-22T23:59:59.000Z

417

Guidelines for inservice testing at nuclear power plants  

Science Conference Proceedings (OSTI)

The staff of the U.S. Nuclear Regulatory Commission (NRC) gives licensees guidelines and recommendations for developing and implementing programs for the inservice testing of pumps and valves at commercial nuclear power plants. The staff discusses the regulations; the components to be included in an inservice testing program; and the preparation and content of cold shutdown justifications, refueling outage justifications, and requests for relief from the American Society of Mechanical Engineers Code requirements. The staff also gives specific guidance on relief acceptable to the NRC and advises licensees in the use of this information at their facilities. The staff discusses the revised standard technical specifications for the inservice testing program requirements and gives guidance on the process a licensee may follow upon finding an instance of noncompliance with the Code.

Campbell, P.

1995-04-01T23:59:59.000Z

418

COMMERCIAL UTILITY PERSPECTIVES ON NUCLEAR POWER PLANT CONTROL ROOM MODERNIZATION  

SciTech Connect

Commercial nuclear power plants (NPPs) in the United States need to modernize their main control rooms (MCR). Many NPPs have done partial upgrades with some success and with some challenges. The Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Program, and in particular the Advanced Instrumentation and Controls (I&C) and Information Systems Technologies Research and Development (R&D) Pathway within LWRS, is designed to assist commercial nuclear power industry with their MCR modernization efforts. As part of this framework, a survey was issued to utility representatives of the LWRS Program Advanced Instrumentation, Information, and Control Systems/Technologies (II&C) Utility Working Group to obtain their views on a range of issues related to MCR modernization, including: drivers, barriers, and technology options, and the effects these aspects will have on concepts of operations, modernization strategies, and staffing. This paper summarizes the key survey results and discusses their implications.

Jeffrey C. Joe; Ronald L. Boring; Julius J. Persensky

2012-07-01T23:59:59.000Z

419

EPRI Independent Peer Review of the TEPCO Seismic Walkdown and Evaluation of the Kashiwazaki-Kariwa Nuclear Power Plants  

Science Conference Proceedings (OSTI)

The Tokyo Electric Power Company's (TEPCO's) Kashiwazaki-Kariwa (KK) plant is the largest nuclear power plant in the world with a total output of 8212 MW. The KK plant is 16 kilometers away from the epicenter of the Niigataken-Chuetsu-Oki (NCO) offshore earthquake, which took place at 10:13 a.m. on July 16, 2007, and had a Richter magnitude of 6.6. Ground motion recordings at the basemat of the seven boiling water reactors at the site revealed that the S2 seismic design level had been exceeded during the...

2008-01-14T23:59:59.000Z

420

The Need for Near-Term Deployment of New Nuclear Power Plants Position Statement  

E-Print Network (OSTI)

The American Nuclear Society (ANS) supports and encourages the near-term deployment of new nuclear power plants. Nuclear energy, the second-largest power source, contributes 20 % of the electricity production in the United States. 1 Nuclear power can be competitive with gas and coal plants. Like solar, wind, and hydropower, nuclear energy has near-zero emissions of greenhouse gases and air pollutants. The more than one hundred nuclear power plants currently operating in the United States have an excellent safety record and are proven reliable sources of power.

unknown authors

2005-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Float level switch for a nuclear power plant containment vessel  

DOE Patents (OSTI)

This invention is a float level switch used to sense rise or drop in water level in a containment vessel of a nuclear power plant during a loss of coolant accident. The essential components of the device are a guide tube, a reed switch inside the guide tube, a float containing a magnetic portion that activates a reed switch, and metal-sheathed, ceramic-insulated conductors connecting the reed switch to a monitoring system outside the containment vessel. Special materials and special sealing techniques prevent failure of components and allow the float level switch to be connected to a monitoring system outside the containment vessel. 1 figures.

Powell, J.G.

1993-11-16T23:59:59.000Z

422

Float level switch for a nuclear power plant containment vessel  

DOE Patents (OSTI)

This invention is a float level switch used to sense rise or drop in water level in a containment vessel of a nuclear power plant during a loss of coolant accident. The essential components of the device are a guide tube, a reed switch inside the guide tube, a float containing a magnetic portion that activates a reed switch, and metal-sheathed, ceramic-insulated conductors connecting the reed switch to a monitoring system outside the containment vessel. Special materials and special sealing techniques prevent failure of components and allow the float level switch to be connected to a monitoring system outside the containment vessel.

Powell, James G. (Clifton Park, NY)

1993-01-01T23:59:59.000Z

423

Next Generation Nuclear Plant Resilient Control System Functional Analysis  

SciTech Connect

Control Systems and their associated instrumentation must meet reliability, availability, maintainability, and resiliency criteria in order for high temperature gas-cooled reactors (HTGRs) to be economically competitive. Research, perhaps requiring several years, may be needed to develop control systems to support plant availability and resiliency. This report functionally analyzes the gaps between traditional and resilient control systems as applicable to HTGRs, which includes the Next Generation Nuclear Plant; defines resilient controls; assesses the current state of both traditional and resilient control systems; and documents the functional gaps existing between these two controls approaches as applicable to HTGRs. This report supports the development of an overall strategy for applying resilient controls to HTGRs by showing that control systems with adequate levels of resilience perform at higher levels, respond more quickly to disturbances, increase operational efficiency, and increase public protection.

Lynne M. Stevens

2010-07-01T23:59:59.000Z

424

Technical Bases for the Development and Application of Derived Concentration Guidance Levels for Decommissioning and License Termination of Nuclear Power Plants  

Science Conference Proceedings (OSTI)

Nuclear Power plants achieve license termination by meeting regulatory site release criteria. Depending on the country, these criteria may be based on radionuclide concentration or dose. For dose-based criteria, corresponding radionuclide concentration limits, called Derived Concentration Guidance Levels (DCGLs), must also be developed. This report provides information related to site release criteria and the development of DCGLs.BackgroundThe ultimate goal ...

2012-09-10T23:59:59.000Z

425

An aerial radiological survey of the Robert Emmett Ginna Nuclear Power Plant and surrounding area, Ontario, New York  

SciTech Connect

Terrestrial radioactivity surrounding the Robert Emmett Ginna Nuclear Power Plant was measured using aerial radiological surveying techniques. The purpose of this survey was to document exposure rates near the plant and to identify unexpected, man-made radiation sources within the survey area. The surveyed area included land areas within a three-mile radius of the plant site. Data were acquired using an airborne detection system that employed sodium iodide, thallium-activated detectors. Exposure-rate and photopeak counts were computed from these data and plotted on aerial photographs of the survey area. Several ground-based exposure measurements were made for comparison with the aerial survey results. Exposure rates in the area surrounding the plant site varied from 6 to 10 microroentgens per hour. Man-made radiation (cobalt-60 within the plant site and cesium-1 37 directly over the reactor) was found at the plant site. In addition, small areas of suspected cesium-137 activity were found within the survey areas. Other than these small sites, the survey area was free of man-made radioac- tivity.

Proctor, A.E.

1997-06-01T23:59:59.000Z

426

Seismic Margin Assessment of the Edwin I. Hatch Nuclear Plant, Unit 1  

Science Conference Proceedings (OSTI)

A seismic margin assessment of the Georgia Power Company Edwin I. Hatch, unit 1 nuclear power plant showed the practicality of an EPRI methodology for assessing the ability of nuclear plants to withstand large earthquakes. The assessment, performed by the utility, established that the plant can withstand an earthquake at least twice the magnitude for which it was designed.

1991-08-01T23:59:59.000Z

427

Comparison of Options for a Pilot Plant Fusion Nuclear Mission  

Science Conference Proceedings (OSTI)

A fusion pilot plant study was initiated to clarify the development needs in moving from ITER to a first of a kind fusion power plant, following a path similar to the approach adopted for the commercialization of fission. The pilot plant mission encompassed component test and fusion nuclear science missions plus the requirement to produce net electricity with high availability in a device designed to be prototypical of the commercial device. Three magnetic configuration options were developed around this mission: the advanced tokamak (AT), spherical tokamak (ST) and compact stellarator (CS). With the completion of the study and separate documentation of each design option a question can now be posed; how do the different designs compare with each other as candidates for meeting the pilot plant mission? In a pro/con format this paper will examine the key arguments for and against the AT, ST and CS magnetic configurations. Key topics addressed include: plasma parameters, device configurations, size and weight comparisons, diagnostic issues, maintenance schemes, availability influences and possible test cell arrangement schemes.

Brown, T; Goldston, R J; El-Guebaly, L; Kessel, C; Neilson, G H; Malang, S; Menard, J E; Prager, S; Waganer, L; Titus, P

2012-08-27T23:59:59.000Z

428

Plant Support Engineering: Nuclear Power Plant Equipment Qualification Reference Manual, Revision 1  

Science Conference Proceedings (OSTI)

This reference manual compiles information on technology, requirements, and experience pertaining to the qualification of safety-related equipment for use in nuclear power plants under normal operating conditions and under adverse environments such as steam line breaks and earthquakes. The manual covers both environmental and seismic qualification of all safety-related electrical and mechanical equipment, but places emphasis on environmental qualification of Class 1E electrical equipment subject to harsh...

2010-09-16T23:59:59.000Z

429

Ukraine Loads U.S. Nuclear Fuel into Power Plant as Part of DOE-Ukraine Nuclear Fuel Qualification Program  

Energy.gov (U.S. Department of Energy (DOE))

fficials from the U.S. Department of Energy’s (DOE) Office of Nuclear Energy today (April 8, 2010) participated in a ceremony in Ukraine to mark the insertion of Westinghouse-produced nuclear fuel into a nuclear power plant in Ukraine.

430

GRR/Section 7-UT-a - Power Plant Siting | Open Energy Information  

Open Energy Info (EERE)

GRR/Section 7-UT-a - Power Plant Siting GRR/Section 7-UT-a - Power Plant Siting < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 7-UT-a - Power Plant Siting Flowchart Narrative There is no single Utah State government agency with primary responsibility for electric generation plant siting. The following State government agencies that could have some jurisdiction involving electric generation plant siting requirements (list may not be exhaustive) : Department of Commerce Division of Public Utilities (utility certification issues) Public Service Commission of Utah (utility certification issues) Department of Environmental Quality Division of Air Quality Division of Solid & Hazardous Waste Division of Water Quality Department of Natural Resources

431

Nuclear Maintenance Applications Center: Considerations for Developing a Critical Parts Program at a Nuclear Power Plant  

Science Conference Proceedings (OSTI)

In 2003, Plant Support Engineering (PSE) of the Electric Power Research Institute (EPRI) published the report Critical Component Identification Process8212Licensee Examples: Scoping and Identification of Critical Components in Support of INPO AP-913 (1007935). That report was the initial output from a project to assist utilities that were implementing Institute of Nuclear Power Operations (INPO) AP-913, Equipment Reliability Process Description. Two of the key aspects of INPO AP-913 are the accurate scop...

2007-11-30T23:59:59.000Z

432

Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 1  

Science Conference Proceedings (OSTI)

The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in acordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and eveloping a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing prinicples, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed. 880 refs., 130 figs., 25 tabs.

NONE

1988-01-01T23:59:59.000Z

433

Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 6  

Science Conference Proceedings (OSTI)

The Yucca Mountain site in Nevada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining the geologic information necessary to demonstrate the suitability of the site for repository, to design the repository and the waste package, to prepare an environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed.

NONE

1988-01-01T23:59:59.000Z

434

Site characterization plan: Yucca Mountain site, Nevada research and development area, Nevada: Consultation draft, Nuclear Waste Policy Act: Volume 7  

Science Conference Proceedings (OSTI)

The Yucca Mountain site in Neavada is one of three candidate sites for the first geologic repository for radioactive waste. On May 28, 1986, it was recommended and approved for detailed study in a program of site characterization. This site characterization plan (SCP) has been prepared in accordance with the requirements of the Nuclear Waste Policy Act to summarize the information collected to date about the geologic conditions at the site;to describe the conceptual designs for the repository and the waste package;and to present the plans for obtaining hte geologic information necessary to demonstrate the suitability of the site for a repository, to design the repository and the waste package, to prepare and environmental impact statement, and to obtain from the US Nuclear Regulatory Commission (NRC) an authorization to construct the repository. This introduction begins with a brief section on the process for siting and developing a repository, followed by a discussion of the pertinent legislation and regulations. A description of site characterization is presented next;it describes the facilities to be constructed for the site characterization program and explains the principal activities to be conducted during the program. Finally, the purpose, content, organizing principles, and organization of this site characterization plan are outlined, and compliance with applicable regulations is discussed.

NONE

1988-01-01T23:59:59.000Z

435

A Simulated Field Trip: "The Visual Aspects of Power Plant Sitings1"  

E-Print Network (OSTI)

Abstract: The growth of our economy is demanding construction of a variety of power plants to generateA Simulated Field Trip: "The Visual Aspects of Power Plant Sitings1" Bill Bottom 2 Alex Young 3 electricity which is having a significant impact on the visual environment. These power plants will consist

Standiford, Richard B.

436

Workers Demolish Coal-fired Steam Plant at EM's Portsmouth Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Workers Demolish Coal-fired Steam Plant at EM's Portsmouth Site Workers Demolish Coal-fired Steam Plant at EM's Portsmouth Site Workers Demolish Coal-fired Steam Plant at EM's Portsmouth Site September 18, 2013 - 12:00pm Addthis A high-pressure water cannon is used to control dust for the demolition of the X-600 Steam Plant. A high-pressure water cannon is used to control dust for the demolition of the X-600 Steam Plant. One of three large smoke stacks comes down during the demolition. One of three large smoke stacks comes down during the demolition. A high-pressure water cannon is used to control dust for the demolition of the X-600 Steam Plant. One of three large smoke stacks comes down during the demolition. PIKETON, Ohio - Towering above most nearby buildings, the X-600 Coal-fired Steam Plant had been part of the Portsmouth Gaseous Diffusion

437

Workers Demolish Coal-fired Steam Plant at EM's Portsmouth Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Workers Demolish Coal-fired Steam Plant at EM's Portsmouth Site Workers Demolish Coal-fired Steam Plant at EM's Portsmouth Site Workers Demolish Coal-fired Steam Plant at EM's Portsmouth Site September 18, 2013 - 12:00pm Addthis A high-pressure water cannon is used to control dust for the demolition of the X-600 Steam Plant. A high-pressure water cannon is used to control dust for the demolition of the X-600 Steam Plant. One of three large smoke stacks comes down during the demolition. One of three large smoke stacks comes down during the demolition. A high-pressure water cannon is used to control dust for the demolition of the X-600 Steam Plant. One of three large smoke stacks comes down during the demolition. PIKETON, Ohio - Towering above most nearby buildings, the X-600 Coal-fired Steam Plant had been part of the Portsmouth Gaseous Diffusion

438

DOE/WIPP-11-2225 Waste Isolation Pilot Plant Annual Site Environmental  

NLE Websites -- All DOE Office Websites (Extended Search)

11-2225 11-2225 Waste Isolation Pilot Plant Annual Site Environmental Report for 2010 U.S. Department of Energy September 2011 Waste Isolation Pilot Plant Annual Site Environmental Report for 2010 DOE/WIPP-11-2225 2 This page intentionally left blank Waste Isolation Pilot Plant Annual Site Environmental Report for 2010 DOE/WIPP-11-2225 3 2010 Annual Site Environmental Report To our readers: This Waste Isolation Pilot Plant (WIPP) Annual Site Environmental Report for 2010 presents summary environmental data to (1) characterize site environmental management performance, (2) summarize environmental occurrences and responses reported during the calendar year, (3) confirm compliance with environmental standards and requirements, and (4) highlight the WIPP Environmental

439

Freedom of Information Act Related Sites | National Nuclear Security...  

National Nuclear Security Administration (NNSA)

agency established by Congress in 1988 to provide safety oversight of the nuclear weapons complex operated by the DOE. National Technical Information Service A centralized...

440

RADIOLOGICAL EMERGENCY RESPONSE PLANNING FOR NUCLEAR POWER PLANTS IN CALIFORNIA. VOLUME 4 OF THE FINAL REPORT ON HEALTH AND SAFETY IMPACTS OF NUCLEAR, GEOTHERMAL, AND FOSSIL-FUEL ELECTRIC GENERATION IN CALIFORNIA  

E-Print Network (OSTI)

PLANNING FOR NUCLEAR POWER PLANTS: THE LICENSING PROCESSPlanning for Nuclear Power Plants Determination of Accidentnuclear power plants . . . . . . . . . • . . . . .2.2.4.3.

Yen, W.W.S.

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Nuclear power plant Generic Aging Lessons Learned (GALL). Appendix B  

SciTech Connect

The purpose of this generic aging lessons learned (GALL) review is to provide a systematic review of plant aging information in order to assess materials and component aging issues related to continued operation and license renewal of operating reactors. Literature on mechanical, structural, and thermal-hydraulic components and systems reviewed consisted of 97 Nuclear Plant Aging Research (NPAR) reports, 23 NRC Generic Letters, 154 Information Notices, 29 Licensee Event Reports (LERs), 4 Bulletins, and 9 Nuclear Management and Resources Council Industry Reports (NUMARC IRs) and literature on electrical components and systems reviewed consisted of 66 NPAR reports, 8 NRC Generic Letters, 111 Information Notices, 53 LERs, 1 Bulletin, and 1 NUMARC IR. More than 550 documents were reviewed. The results of these reviews were systematized using a standardized GALL tabular format and standardized definitions of aging-related degradation mechanisms and effects. The tables are included in volume s 1 and 2 of this report. A computerized data base has also been developed for all review tables and can be used to expedite the search for desired information on structures, components, and relevant aging effects. A survey of the GALL tables reveals that all ongoing significant component aging issues are currently being addressed by the regulatory process. However, the aging of what are termed passive components has been highlighted for continued scrutiny. This report consists of Volume 2, which consists of the GALL literature review tables for the NUMARC Industry Reports reviewed for the report.

Kasza, K.E.; Diercks, D.R.; Holland, J.W.; Choi, S.U. [and others

1996-12-01T23:59:59.000Z

442

Cognitive skill training for nuclear power plant operational decision making  

SciTech Connect

Training for operator and other technical positions in the commercial nuclear power industry traditionally has focused on mastery of the formal procedures used to control plant systems and processes. However, decisionmaking tasks required of nuclear power plant operators involve cognitive skills (e.g., situation assessment, planning). Cognitive skills are needed in situations where formal procedures may not exist or may not be as prescriptive, as is the case in severe accident management (SAM). The Westinghouse research team investigated the potential cognitive demands of SAM on the control room operators and Technical Support Center staff who would be most involved in the selection and execution of severe accident control actions. A model of decision making, organized around six general cognitive processes, was developed to identify the types of cognitive skills that may be needed for effective performance. Also, twelve SAM scenarios were developed to reveal specific decision-making difficulties. Following the identification of relevant cognitive skills, 19 approaches for training individual and team cognitive skills were identified. A review of these approaches resulted in the identification of general characteristics that are important in effective training of cognitive skills.

Mumaw, R.J.; Swatzler, D.; Roth, E.M. [Westinghouse Electric Corp., Pittsburgh, PA (United States); Thomas, W.A. [Quantum Technologies, Inc., Oak Brook, IL (United States)

1994-06-01T23:59:59.000Z

443

Advanced design nuclear power plants: Competitive, economical electricity. An analysis of the cost of electricity from coal, gas and nuclear power plants  

SciTech Connect

This report presents an updated analysis of the projected cost of electricity from new baseload power plants beginning operation around the year 2000. Included in the study are: (1) advanced-design, standardized nuclear power plants; (2) low emissions coal-fired power plants; (3) gasified coal-fired power plants; and (4) natural gas-fired power plants. This analysis shows that electricity from advanced-design, standardized nuclear power plants will be economically competitive with all other baseload electric generating system alternatives. This does not mean that any one source of electric power is always preferable to another. Rather, what this analysis indicates is that, as utilities and others begin planning for future baseload power plants, advanced-design nuclear plants should be considered an economically viable option to be included in their detailed studies of alternatives. Even with aggressive and successful conservation, efficiency and demand-side management programs, some new baseload electric supply will be needed during the 1990s and into the future. The baseload generating plants required in the 1990s are currently being designed and constructed. For those required shortly after 2000, the planning and alternatives assessment process must start now. It takes up to ten years to plan, design, license and construct a new coal-fired or nuclear fueled baseload electric generating plant and about six years for a natural gas-fired plant. This study indicates that for 600-megawatt blocks of capacity, advanced-design nuclear plants could supply electricity at an average of 4.5 cents per kilowatt-hour versus 4.8 cents per kilowatt-hour for an advanced pulverized-coal plant, 5.0 cents per kilowatt-hour for a gasified-coal combined cycle plant, and 4.3 cents per kilowatt-hour for a gas-fired combined cycle combustion turbine plant.

1992-06-01T23:59:59.000Z

444

Radioactive Releases Impact from Kozloduy Nuclear Power Plant, Bulgaria into the Environment  

SciTech Connect

The aim of this paper is to present a general overview of the radioactive releases impact generated by Kozloduy Nuclear Power Plant (KNPP), Bulgaria to the environment and public. The liquid releases presented are known as the so called controlled water discharges, that are generated after reprocessing of the inevitable accumulated liquid radioactive waste in the plant operation process. The radionuclides containing in the liquid releases are given in the paper as a result of systematic measuring. Database for radiation doses evaluation on the public around Kozloduy NPP site is developed using IAEA LADTAP computerized program. The computer code LADTAP represents realization of a model that evaluates the public dose as a result of NPP releases under normal operation conditions. The results of this evaluation were the basic licensing document for a new liquid release limit.

Genchev, G. T.; Kuleff, I.; Tanev, N. T.; Delistoyanova, E. S.; Guentchev, T.

2002-02-26T23:59:59.000Z

445

Identification of good practices in the operation of nuclear power plants  

E-Print Network (OSTI)

This work developed an approach to diagnose problems and identify good practices in the operation of nuclear power plants using the system dynamics technique. The research began with construction of the ORSIM (Nuclear Power ...

Chen, Haibo, 1975-

2005-01-01T23:59:59.000Z

446

Volume I, Summary Report: A Roadmap to Deploy New Nuclear Power Plants in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Volume I, Summary Report: A Roadmap to Deploy New Nuclear Power Volume I, Summary Report: A Roadmap to Deploy New Nuclear Power Plants in the United States by 2010: Volume I, Summary Report: A Roadmap to Deploy New Nuclear Power Plants in the United States by 2010: Nuclear power plants in the United States currently produce about 20 percent of the nation's electricity. This nuclear-generated electricity is safe, clean and economical, and does not emit greenhouse gases. Continued and expanded reliance on nuclear energy is one key to meeting future demand for electricity in the U.S. and is called for in the National Energy Policy. Nevertheless, no new nuclear plants have been built in the U.S. in many years, and none are currently slated for construction. The U.S. Department of Energy (DOE) has been working with the nuclear

447

An examination of the pursuit of nuclear power plant construction projects in the United States  

E-Print Network (OSTI)

The recent serious reconsideration of nuclear power as a means for U.S. electric utilities to increase their generation capacity provokes many questions regarding the achievable success of future nuclear power plant ...

Guyer, Brittany (Brittany Leigh)

2011-01-01T23:59:59.000Z

448

Volume I, Summary Report: A Roadmap to Deploy New Nuclear Power Plants in  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Volume I, Summary Report: A Roadmap to Deploy New Nuclear Power Volume I, Summary Report: A Roadmap to Deploy New Nuclear Power Plants in the United States by 2010: Volume I, Summary Report: A Roadmap to Deploy New Nuclear Power Plants in the United States by 2010: Nuclear power plants in the United States currently produce about 20 percent of the nation's electricity. This nuclear-generated electricity is safe, clean and economical, and does not emit greenhouse gases. Continued and expanded reliance on nuclear energy is one key to meeting future demand for electricity in the U.S. and is called for in the National Energy Policy. Nevertheless, no new nuclear plants have been built in the U.S. in many years, and none are currently slated for construction. The U.S. Department of Energy (DOE) has been working with the nuclear

449

Fire Events Database and Generic Ignition Frequency Model for U.S. Nuclear Power Plants  

Science Conference Proceedings (OSTI)

This report contains a revision of the EPRI Fire Events Database for U.S. Nuclear Power Plants last published in EPRI Report 1000894 in October 2000. This report also contains a revision of the generic fire ignition frequency models that were published in NSAC-178L, "Fire Events Database of U.S. Nuclear Power Plants" (January 1993) and EPRI TR-105929, "Fire Ignition Frequency Model at Shutdown for U.S. Nuclear Power Plants" (December 1995).

2001-11-09T23:59:59.000Z

450

Ten-Year Site Plans (TYSP) | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

The TYSPs are not binding plans of action. Current Final TYSPs, FY2013-2022: Kansas City Plant TYSP Lawrence Livermore National Laboratory TYSP Los Alamos National Laboratory...

451

Pinellas Plant Annual Site Environmental Report for calendar year 1994  

Science Conference Proceedings (OSTI)

This report presents a comprehensive summary of the results of the Environmental Monitoring, Waste Management, and Environmental Restoration Programs at the Pinellas Plant, in Pinellas County, Florida for 1994. This report also includes the plant`s performance in the areas of compliance with applicable regulatory requirements and standards and identifies major Environmental, Safety and Health Program initiatives and accomplishments for 1994. As a result of the end of Department of Energy Defense Programs mission production on September 30, 1994, considerable changes at the Pinellas Plant occurred. These changes, which included transitioning the plant toward alternate use in support of economic development and safe shutdown, both increased and heightened Environmental, Safety and Health responsibilities. In December 1994, the Department of Energy announced it had reached an agreement to sell the Pinellas Plant to the Pinellas County Industry Council in March 1995. The plant is being leased back by the Department of Energy through September 1997 to complete safe shutdown, reconfiguration, transfer of equipment to other Department of Energy production facilities, and transition to commercial ventures. Permit modifications and transfers will be completed during 1995 to reflect the new ownership by the Pinellas County Industry Council and to include new tenants as needed.

NONE

1995-06-01T23:59:59.000Z

452

Use of Modeling for Prevention of Solids Formation During Canyon Processing of Legacy Nuclear Materials at the Savannah River Site  

Science Conference Proceedings (OSTI)

The Savannah River Site (SRS) Environmental Management (EM) nuclear material stabilization program includes the dissolution and processing of legacy materials from various DOE sites. The SRS canyon facilities were designed to dissolve and process spent nuclear fuel and targets. As the processing of typical materials is completed, unusual and exotic nuclear materials are being targeted for stabilization. These unusual materials are often difficult to dissolve using historical flowsheet conditions and require more aggressive dissolver solutions. Solids must be prevented in the dissolver to avoid expensive delays associated with the build-up of insoluble material in downstream process equipment. Moreover, it is vital to prevent precipitation of all solids, especially plutonium-bearing solids, since their presence in dissolver solutions raises criticality safety issues. To prevent precipitation of undesirable solids in aqueous process solutions, the accuracy of computer models to predict precipitate formation requires incorporation of plant specific fundamental data. These data are incorporated into a previously developed thermodynamic computer program that applies the Pitzer correlation to derive activity coefficient parameters. This improved predictive model will reduce unwanted precipitation in process solutions at DOE sites working with EM nuclear materials in aqueous solutions.

Rhodes, W. D.; Crooks III, W. J.; Christian, J. D.

2002-02-26T23:59:59.000Z

453

Success of the first nuclear power plant built on China`s self-reliance  

Science Conference Proceedings (OSTI)

Having overcome a series of difficulties and hard points, the first Chinese indigenous nuclear power plant, Qinshan Nuclear Power Plant of PWR type with the capacity of 300MW(e) is now in steady operation. Through tremendous works done for this project great achievements and experience as well as lessons learned have been obtained for systematic acquisition of nuclear power technology. The sound fact has demonstrated that China has the ability to develop nuclear power mainly depending on self-reliance.

Yu, O.

1994-12-31T23:59:59.000Z

454

A Systems Engineering Framework for Design, Construction and Operation of the Next Generation Nuclear Plant  

DOE Green Energy (OSTI)

Not since the International Space Station has a project of such wide participation been proposed for the United States. Ten countries, the European Union, universities, Department of Energy (DOE) laboratories, and industry will participate in the research and development, design, construction and/or operation of the fourth generation of nuclear power plants with a demonstration reactor to be built at a DOE site and operational by the middle of the next decade. This reactor will be like no other. The Next Generation Nuclear Plant (NGNP) will be passively safe, economical, highly efficient, modular, proliferation resistant, and sustainable. In addition to electrical generation, the NGNP will demonstrate efficient and cost effective generation of hydrogen to support the President’s Hydrogen Initiative. To effectively manage this multi-organizational and technologically complex project, systems engineering techniques and processes will be used extensively to ensure delivery of the final product. The technological and organizational challenges are complex. Research and development activities are required, material standards require development, hydrogen production, storage and infrastructure requirements are not well developed, and the Nuclear Regulatory Commission may further define risk-informed/performance-based approach to licensing. Detailed design and development will be challenged by the vast cultural and institutional differences across the participants. Systems engineering processes must bring the technological and organizational complexity together to ensure successful product delivery. This paper will define the framework for application of systems engineering to this $1.5B - $1.9B project.

Edward J. Gorski; Charles V. Park; Finis H. Southworth

2004-06-01T23:59:59.000Z

455

Compilation of Results and Feedback Regarding Turbine Upgrades at Nuclear and Fossil Power Plants  

Science Conference Proceedings (OSTI)

This report compiles results and feedback and draws a number of conclusions and lessons learned regarding steam turbine generator upgrades at nuclear and fossil power plants.

2008-11-24T23:59:59.000Z

456

Analysis of Nuclear Power Plant Operating Costs: A 1995 Update, An  

Reports and Publications (EIA)

This report provides an analysis of nuclear power plant operating costs. EIA published three reports on this subject during the period 1988-1995.

James G. Hewlett

1995-04-01T23:59:59.000Z

457

Guideline for On-Line Monitoring of Nuclear Power Plant Instrument Channel Performance  

Science Conference Proceedings (OSTI)

This report provides a guideline for a utility to develop an on-line monitoring (OLM) program for evaluating instrument channel performance at nuclear power plants (NPPs).

2011-11-08T23:59:59.000Z

458

Survey on the Use of Configuration Risk and Safety Management Tools at Nuclear Power Plants  

Science Conference Proceedings (OSTI)

A joint project of Electricite de France (EDF) and EPRI, this project analyzed use of configuration safety and risk management tools at nuclear power plants.

1998-09-24T23:59:59.000Z

459

A review of the methods of economic analysis of nuclear power plants.  

E-Print Network (OSTI)

??Nuclear power plants across the United States are reaching the end of their current operating licenses, forcing decision makers to think about the way forward.… (more)

Cavender, Brittainy Anne

2011-01-01T23:59:59.000Z

460

Long term control of 3D engineering data for nuclear power plants  

Science Conference Proceedings (OSTI)

The engineering of the next generation of nuclear power plants requires to take into account the whole plant lifecycle: engineering, building, operating, maintaining and decommissioning. Satisfying stronger and stronger safety regulations requires the ...

Thomas Paviot; Christophe Mouton; Samir Lamouri

2013-06-01T23:59:59.000Z

Note: This page contains sample records for the topic "nuclear plant site" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

PROGRESS WITH K BASINS SLUDGE RETRIEVAL STABILIZATION & PACKAGING AT THE HANFORD NUCLEAR SITE  

SciTech Connect

This paper shows how Fluor Hanford and BNG America have combined nuclear plant skills from the U.S. and the U.K. to devise methods to retrieve and treat the sludge that has accumulated in K Basins at the Hanford Site over many years. Retrieving the sludge is the final stage in removing fuel and sludge from the basins to allow them to be decontaminated and decommissioned, so as to remove the threat of contamination of the Columbia River. A description is given of sludge retrieval using vacuum lances and specially developed nozzles and pumps into Consolidation Containers within the basins. The special attention that had to be paid to the heat generation and potential criticality issues with the irradiated uranium-containing sludge is described. The processes developed to re-mobilize the sludge from the Consolidation Containers and pump it through flexible and transportable hose-in-hose piping to the treatment facility are explained with particular note made of dealing with the abrasive nature of the sludge. The treatment facility, housed in an existing Hanford building, is described, and the uranium-corrosion and grout packaging processes explained. The uranium corrosion process is a robust, tempered process very suitable for dealing with a range of differing sludge compositions. Optimization and simplification of the original sludge corrosion process design is described and the use of transportable and reusable equipment is indicated. The processes and techniques described in the paper are shown to have wide applicability to nuclear cleanup.

KNOLLMEYER, P.M.; PHILLIPS, C; TOWNSON, P.S.

2006-01-30T23:59:59.000Z

462

Application of Spatial Data Modeling Systems, Geographical Information Systems (GIS), and Transportation Routing Optimization Methods for Evaluating Integrated Deployment of Interim Spent Fuel Storage Installations and Advanced Nuclear Plants  

SciTech Connect

The objective of this siting study work is to support DOE in evaluating integrated advanced nuclear plant and ISFSI deployment options in the future. This study looks at several nuclear power plant growth scenarios that consider the locations of existing and planned commercial nuclear power plants integrated with the establishment of consolidated interim spent fuel storage installations (ISFSIs). This research project is aimed at providing methodologies, information, and insights that inform the process for determining and optimizing candidate areas for new advanced nuclear power generation plants and consolidated ISFSIs to meet projected US electric power demands for the future.

Mays, Gary T [ORNL; Belles, Randy [ORNL; Cetiner, Mustafa Sacit [ORNL; Howard, Rob L [ORNL; Liu, Cheng [ORNL; Mueller, Don [ORNL; Omitaomu, Olufemi A [ORNL; Peterson, Steven K [ORNL; Scaglione, John M [ORNL