Powered by Deep Web Technologies
Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

NSA-Beaver Pond Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Beaver Pond Site (NSA-BP) Beaver Pond Site (NSA-BP) The storage tent and gas collectors NSA-BP site looking to the east. Visible is the investigator hut on drier land to the west and the boardwalk leading out to the tower site in the right portion of the image with the mounded beaver lodge visible in the middle of the image. The bridge and the 3 meter flux tower The beaver lodge The bridge from the flux tower This is the floating bridge leading from the flux tower back to the shore. The large tent for holding equipment is clearly visible on the shore. The TGB gas collectors on the beaver pond Back to the BOREAS Photo Page Index Other Sites: NSA Photos ||NSA-BP Photos | NSA-Fen Photos | NSA-OA Photos | NSA-OBS Photos | NSA-OJP Photos | NSA-UBS Photos | NSA-YJP Photos | NSA-Ops Photos

2

ARM - NSA Science  

NLE Websites -- All DOE Office Websites (Extended Search)

AlaskaNSA Science AlaskaNSA Science NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts NSA Science Scientific objectives for the NSA/AAO site are provided below: Provide the comprehensive data sets necessary to develop and test continually improved algorithms for GCMs to describe radiative transfer and cloud processes at high latitudes; Specifically focus on development of algorithms to describe: radiative transfer within both the clear and cloudy atmosphere, especially at low temperatures; physical and optical behavior of water (ice) and land surfaces, both bare and snow-covered, especially during transitions from winter to summer and back; physical and optical behavior of ice and mixed phase clouds.

3

NSA-Fen Site  

NLE Websites -- All DOE Office Websites (Extended Search)

NSA-Fen) NSA-Fen) The Fen from the air, looking North. You can see the boardwalk, the hut, and the size of the bog. The road (Highway 391) is visible at the top. The round "crater" near the base of the boardwalk on the right is a collapsed palsa. View an aerial photo-map of the NSA-Fen site. The ground cover on the Fen itself The hut and flux tower The Fen site from the shore looking toward the hut The Fen site flux tower The boardwalk in the Fen, looking back at the shore The generator shed and the storage tent The NSA-Fen site from the air during IFC-2. Top of image is to Southeast. The NSA-Fen site in September (IFC-3) 1994 looking to the southeast. The tower is at the end of the boardwalk in right center of image with the hut near the center. The boardwalk connects to the far border at left center of the slide. Note that the tamarack (deciduous evergreen) within the fen has its fall colors.

4

NSA Barrow Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Barrow Facility Barrow Facility NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts NSA Barrow Facility Location: 71° 19' 23.73" N, 156° 36' 56.70" W Altitude: 8 meters The Barrow facility was dedicated in July 1997 and chosen because the Arctic is particularly sensitive to climate changes. Barrow is located at the northernmost point in the United States, 330 miles north of the Arctic Circle. Also known as the Top of the World, Barrow is Alaska's largest Eskimo village (home to 4,581 people). Tax revenue from the Slope's oil fields pay for services borough wide, and natural gas is used to heat homes and generate electricity in Barrow. Many residents, however, maintain

5

ARM - NSA Barrow Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Barrow Facility Barrow Facility NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts NSA Barrow Facility Location: 71° 19' 23.73" N, 156° 36' 56.70" W Altitude: 8 meters The Barrow facility was dedicated in July 1997 and chosen because the Arctic is particularly sensitive to climate changes. Barrow is located at the northernmost point in the United States, 330 miles north of the Arctic Circle. Also known as the Top of the World, Barrow is Alaska's largest Eskimo village (home to 4,581 people). Tax revenue from the Slope's oil fields pay for services borough wide, and natural gas is used to heat homes and generate electricity in Barrow. Many residents, however, maintain

6

NSA-Old Black Spruce Site  

NLE Websites -- All DOE Office Websites (Extended Search)

NSA-OBS) NSA-OBS) The NSA-OBS site from the air. This aerial shot of the OBS site shows the generator in the lower-right corner, one of the huts in the upper-left corner, and part of the boardwalk leading away from the hut. View an aerial photo-map of the NSA-OBS site. OBS spruce trees and flux tower The road to the OBS site. The road to the OBS site was often a muddy mess, accessable only by ARGO all-terrain vehicles, and even they got stuck often. The OBS flux tower The NSA black spruce carbon model evaluation site and TE canopy access tower. Oblique view of the trail leading into the NSA Old Black Spruce site. Highway 391 is beyond the image at the bottom and the power line is viewable at the top of the image. The NSA-OBS site would be off to the upper left. The NSA-OBS Rohn tower where Amar Bazzaz of Harvard University is climbing the tower for maintenance.

7

ARM/NSA Vehicle Use Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

Operating Procedures for Scaffold Use October 2007 Operating Procedures for Scaffold Use October 2007 Atmospheric Radiation Measurement Climate Research Facility/ North Slope of Alaska/Adjacent Arctic Ocean (ACRF/NSA/AAO) Operating Procedures for The Use of Scaffolds at ACRF/NSA/AAO Meteorological Towers Introduction: An aluminum scaffold structure is used at ARM Climate Research Facility/North Slope of Alaska/Adjacent Arctic Ocean (ACRF/NSA/AAO) Sites to access instruments mounted on the meteorological tower as shown in Figure 1 below. The scaffold is typically used for maintenance of instruments mounted on moveable booms or for maintenance of guest or temporary instruments. The scaffold is a commercially-available product that was purchased from Upright, Inc. and was fitted with aluminum grating platforms by Cubic Designs, Inc. of

8

ARM - NSA Atqasuk Facility-Inactive  

NLE Websites -- All DOE Office Websites (Extended Search)

Atqasuk Facility-Inactive Atqasuk Facility-Inactive NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts NSA Atqasuk Facility-Inactive Location: 70° 28' 19.11" N, 157° 24' 28.99" W Altitude: 20 meters The Atqasuk facility, which was part of the larger ARM Climate Research Facility (ARM) North Slope of Alaska site, was installed the summer of 1999 off of a road near the Atqasuk Airport and operated through 2010. Located approximately 70 miles south of Barrow, Atqasuk is adjacent to the Meade River. Its climate is much more continental than that of Barrow. Atqasuk (population 225) has an economy that is largely based on subsistence fishing and caribou hunting. The Atqasuk community

9

ARM/NSA Vehicle Use Policy  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Tip Tower Lowering Procedure November 2006 Atmospheric Radiation Measurement Climate Research Facility/ North Slope of Alaska/Adjacent Arctic Ocean NSA Tip Tower Lowering Procedure Procedure Summary: The tip tower is hinged approximately 6 feet above the ground. A set of weights permanently positioned on the lower portion of the tower are used to counterbalance the weight of the tower as it is lowered. To assist in tower lowering, a nylon line, fastened to the mid-section of the tower, is used to pull the tower downward. In the lowered position, a hinged wood frame supports the top of the tower while instrument maintenance is performed. Following instrument maintenance, the counterweights are used to naturally pull the tower back to an upright position

10

Naval Support Activity (NSA) in Bethesda Employment Education Fair  

Energy.gov (U.S. Department of Energy (DOE))

Location: NSA Bethesda Fitness Center (Gymnasium, Bldg 17), 8901 Wisconsin Ave., Bethesda, MD 20889Attendees: Donna Friend (HC) and Rauland Sharp (HC)POC: Donna FriendWebsite:http://bit.ly/1yTjTNu

11

C1-  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04/91 08:52 04/91 08:52 0 C1- 2O?-' 0*32 O FICE C7 AKC FOR P'TENTS C-42 Statement of Considerations CLASS WAIVER Ol THE rOVERNMENT'S U.S. AND FOREIGN DATENT q41rHT IN INVFNTIONS MAnE IN THE COURSE Or OR UNDER COD0ERATIVE ArREMENTý ENTEREn INTO UNDER THE DEPARTMENT OF ENERGY'S WirH TEMPERATURE SUDER*OINDUCTIVITY ITLOT CENTCRS PROGRAM W(C)-88-001 The rlpe~,stnt Of Energy (D0tO considers the National Laboratories to he a unique and * aluable national resource that should be made available to the extent feasible for use by others to accelerate commercioizratlu , ufr a,*'qy technology. In 11Q7 Dresident Reaqaa issued Executive Order No. 17,901 entitled "Facilitatino Access to Science and Technology". The purpose of this Executive nrder was to ensure that Federal apencies

12

Optimization Online - Search or Browse Submissions  

E-Print Network (OSTI)

Search or Browse Optimization Online Submissions. Advanced Search using Our Search Engine. Enter your search terms: name of author(s), title, keywords,...

13

Hey, NSA: Stay Away from my Market! Future Proofing App Markets against Powerful Attackers  

Science Journals Connector (OSTI)

Mobile devices are evolving as the dominant computing platform and consequently application repositories and app markets are becoming the prevalent paradigm for deploying software. Due to their central and trusted position in the software ecosystem, ... Keywords: android, apps, market, nsa, security, transparency

Sascha Fahl, Sergej Dechand, Henning Perl, Felix Fischer, Jaromir Smrcek, Matthew Smith

2014-11-01T23:59:59.000Z

14

Analysis of Selected Radiosonde Data from the ARM/NSA Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Analysis of Selected Radiosonde Data Analysis of Selected Radiosonde Data from the ARM/NSA Site B. Petracca, H. W. Church, and B. D. Zak Sandia National Laboratories Albuquerque, New Mexico R. Storvold and C. Marty Geophysical Institute University of Alaska Fairbanks, Alaska B. M. Lesht Argonne National Laboratories Argonne, Illinois Introduction The purpose of this study was to analyze differences in temperature and relative humidity (RH) profiles obtained from near-simultaneous radiosonde soundings made from different locations at and near the North Slope of Alaska (NSA) Cloud and Radiation Testbed (CART) site. The data for this study come from the Vaisala RS-80H radiosondes flown by Atmospheric Radiation Measurement (ARM) Program during the comparison periods, and from VIZ B2 radiosondes flown by the National Weather Service

15

Derivation of Seasonal Cloud Properties at ARM-NSA from Multispectral MODIS Data  

NLE Websites -- All DOE Office Websites (Extended Search)

Derivation of Seasonal Cloud Properties at ARM-NSA Derivation of Seasonal Cloud Properties at ARM-NSA from Multispectral MODIS Data D. A. Spangenberg Analytical Services and Materials, Inc. Hampton, Virginia P. Minnis National Aeronautics and Space Administration Langley Research Center Hampton, Virginia T. Uttal National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado Q. Z. Trepte and S. S.-Mack Science Applications International Corporation Hampton, Virginia Introduction Improving climate model predictions over earth's Polar Regions requires a complete knowledge of polar cloud microphysics. Over the Arctic, there is minimal contrast between the clouds and background snow surface observed in satellite data, especially for visible wavelengths. This makes it difficult to

16

Characterization of Surface Albedo Over the ARM SGP CART and the NSA  

NLE Websites -- All DOE Office Websites (Extended Search)

Characterization of Surface Albedo Characterization of Surface Albedo Over the ARM SGP CART and the NSA Z. Li and M. C. Cribb Earth System Science Interdisciplinary Center University of Maryland College Park, Maryland A. P. Trishchenko and Y. Luo Canada Centre for Remote Sensing Ottawa, Ontario, Canada Introduction Surface albedo is needed for satellite remote sensing of the surface radiation budget and for climate modelling. Determination of areal-mean surface albedo is challenging. Over the Southern Great Plains (SGP) site, a primary challenge lies in the inhomogeneity associated with different land cover types. Over the North Slope of Alaska (NSA) site, persistent cloud cover renders remote sensing of surface albedo difficult. We tackle both challenges following two different approaches. Over the SGP site, we

17

Atmospheric Radiation Measurement (ARM) Data from the North Slope Alaska (NSA) Site  

DOE Data Explorer (OSTI)

The Atmospheric Radiation Measurement (ARM) Program is the largest global change research program supported by the U.S. Department of Energy. The primary goal of the ARM Program is to improve the treatment of cloud and radiation physics in global climate models in order to improve the climate simulation capabilities of these models. To achieve this goal, ARM scientists and researchers around the world use continuous data obtained through the ARM Climate Research Facility. ARM maintains four major, permanent sites for data collection and deploys the ARM Mobile Facility to other sites as determined. The North Slope of Alaska (NSA) site is a permanent site providing data about cloud and radiative processes at high latitudes. These data are being used to refine models and parameterizations as they relate to the Arctic. Centered at Barrow and extending to the south (to the vicinity of Atqasuk), west (to the vicinity of Wainwright), and east (towards Oliktok), the NSA site has become a focal point for atmospheric and ecological research activity on the North Slope. Approximately 300,000 NSA data sets from 1993 to the present reside in the ARM Archive at http://www.archive.arm.gov/. Users will need to register for a password, but all files are then free for viewing or downloading. The ARM Archive physically resides at the Oak Ridge National Laboratory.

18

Speed-dependent Automatic Zooming for Browsing Large Documents  

E-Print Network (OSTI)

@microsoft.com ABSTRACT We propose a navigation technique for browsing large documents that integrates rate. With typical scrolling interfaces, it is difficult to browse a large document efficiently. UsingSpeed-dependent Automatic Zooming for Browsing Large Documents Takeo Igarashi Computer Science

Igarashi, Takeo

19

DOE Research and Development Accomplishments Database Browse  

NLE Websites -- All DOE Office Websites (Extended Search)

Database Browse Database Browse The ASTRAL Compendium in 2004; Chandonia, John-Marc; Hon, Gary; Walker, Nigel S.; Lo Conte, Loredana; Koehl, Patrice; Levitt, Michael; Brenner, Steven E.; September 15, 2003; LBNL--53820; ACC0491 322 K, 10 pp. View Document A Novel Method for Sampling Alpha-Helical Protein Backbones; Fain, Boris; Levitt, Michael; 2001; ; ACC0490 1223 K, 28 pp. View Document Chemical Research--Radiochemistry Report for Month Ending April 17, 1943; Franck, J. Division Director; 1952; CC-579; ACC0484 13567 K, 21 pp. View Document Theoretical Studies in Chemical Kinetics - Annual Report, 1970.; Karplus, Martin; October 1970; HUX--3780-33; ACC0483 544 K, 7 pp. View Document Nonequilibrium Contribution to the Rate of Reaction. III. Isothermal Multicomponent Systems; Shizgal, B.; Karplus, M.; October 1970; HUX--3780-31; ACC0482

20

SCP06C1  

NLE Websites -- All DOE Office Websites (Extended Search)

C1 "Midge" C1 "Midge" See Barbary et al. (2011) for details. Aperture photometry on this page is for diagnostic purposes only. See Suzuki et al. (2011) for photometry and cosmology analysis. Data Lightcurve Local Environment : Stacked color image Pixel Position (2005.65 , 3118.19) Gaussian Fit (2005.58 , 3118.16) RA,DEC (12:29:33.012 , + 1:51:36.68) Cluster Offset 21.6 arcsec Redshift 0.980 Redshift from sn Cluster Redshift 0.97 Found with uniform selection Yes Lightcurve Cut 1, 2, 3 PASS, PASS, PASS Classification SN Ia Typing based on a,c Discovery 1 ep = 02 (2005.71,3118.26) mag = 25.048 apsig = 6.335 Discovery 2 ep = 03 (2005.51,3118.14) mag = 23.468 apsig = 22.321 Discovery 3 ep = 05 (2005.72,3118.18) mag = 23.934 apsig = 14.651 Host Distance 0.964 arcsec ( 19.28 pixels) Host z850

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Metadata type system: integrate presentation, data models and extraction to enable exploratory browsing interfaces  

Science Journals Connector (OSTI)

Exploratory browsing involves encountering new information during open-ended tasks. Disorientation and digression are problems that arise, as the user repeatedly loses context while clicking hyperlinks. To maintain context, exploratory browsing interfaces ... Keywords: dynamic metadata, exploratory browsing, type systems

Yin Qu, Andruid Kerne, Nic Lupfer, Rhema Linder, Ajit Jain

2014-06-01T23:59:59.000Z

22

Strategies for Using the Back Button when Browsing the Web  

E-Print Network (OSTI)

Strategies for Using the Back Button when Browsing the Web by Andrey Feuerverger 1 and Je#11;rey S Wide Web, we consider Markov chains with the option of moving \\back" to the previous state. For #12. This modi#12;ed walk (or \\backo#11; process") is intended to model a user browsing the World Wide Web, where

Rosenthal, Jeffrey S.

23

c1.xls  

Gasoline and Diesel Fuel Update (EIA)

October 2006 October 2006 Next CBECS will be conducted in 2007 Primary Site All Buildings* .................................. 4,645 64,783 5,820 9,168 3,037 1,928 222 634 District Heat Table C1. Total Energy Consumption by Major Fuel for Non-Mall Buildings, 2003 All Buildings* Total Energy Consumption (trillion Btu) Number of Buildings (thousand) Floorspace (million square feet) Sum of Major Fuels Electricity Natural Gas Fuel Oil Climate Zone: 30-Year Average Under 2,000 CDD and -- More than 7,000 HDD ..................... 855 10,622 990 1,232 408 431 63 88 5,500-7,000 HDD ............................ 1,173 17,335 1,761 2,305 763 679 63 255 4,000-5,499 HDD ............................ 673 11,504 1,134 1,713 567 337 90 140 Fewer than 4,000 HDD ................... 1,276 15,739 1,213 2,259 748 358 6 101 2,000 CDD or More and --

24

Browse by Discipline -- E-print Network Subject Pathways: Biology...  

NLE Websites -- All DOE Office Websites (Extended Search)

Home About Advanced Search Browse by Discipline Scientific Societies E-print Alerts Add E-prints FAQ * HELP * SITE MAP * CONTACT US Enter Search Terms Search Advanced Search...

25

Browse by Discipline -- E-print Network Subject Pathways: Plasma...  

NLE Websites -- All DOE Office Websites (Extended Search)

Home About Advanced Search Browse by Discipline Scientific Societies E-print Alerts Add E-prints FAQ * HELP * SITE MAP * CONTACT US Enter Search Terms Search Advanced Search...

26

Browse by Discipline -- E-print Network Subject Pathways: Power...  

NLE Websites -- All DOE Office Websites (Extended Search)

Home About Advanced Search Browse by Discipline Scientific Societies E-print Alerts Add E-prints FAQ * HELP * SITE MAP * CONTACT US Enter Search Terms Search Advanced Search...

27

Global ISCCP B1 Browse System | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Global ISCCP B1 Browse System Global ISCCP B1 Browse System Agriculture Community Menu DATA APPS EVENTS DEVELOPER STATISTICS COLLABORATE ABOUT Agriculture You are here Data.gov » Communities » Agriculture » Data Global ISCCP B1 Browse System Dataset Summary Description Global full disk satellite images from 1983 to present. Tags {GIBBS,ISCCP,satellite,full-disk,geostationary,infrared,visible,"water vapor",GOES,POES,DMSP,ISCCP,GVI,AVHRR,TOVS,ATOVS,SSM/I,HIRS,AMSU-A,AMSU-B,TIROS,VTPR,GVAR,CLASS,"Scientific data Stewardship",Browse,Images,"Satellite Images","Satellite data"} Dataset Ratings Overall 0 No votes yet Data Utility 0 No votes yet Usefulness 0 No votes yet Ease of Access 0 No votes yet Dataset Additional Information Last Updated 03/08/12 Publisher National Oceanic and Atmospheric Administration, Department of Commerce

28

Browse by region (RaphaelSVGMap) | OpenEI Community  

Open Energy Info (EERE)

Browse by region (RaphaelSVGMap) Browse by region (RaphaelSVGMap) Home > Groups > Developer Dear all, I am wondering if the semantic result format for the region browser (http://en.openei.org/wiki/Browse_By_Region) is available for reuse. Could anyone point me to the developer of it? Thanks and best wishes, Timo Submitted by Timo.Kouwenhoven on 2 October, 2013 - 05:35 2 answers Points: 1 Timo, My apologies for the delayed response. The Semantic Result Format we used was a custom Raphael SVG mapping format we developed. While we're not easily able to release it, you can replicate the even better Google GeoCharts Result Format, which you can see here: http://en.openei.org/wiki/About_the_Smart_Grid For this, all we did was take the code for the Google GeoMaps Result Format and modify it to pass in the parameters and base URL necessary to access

29

Browse by region (RaphaelSVGMap) | OpenEI Community  

Open Energy Info (EERE)

Browse by region (RaphaelSVGMap) Browse by region (RaphaelSVGMap) Home > Groups > Developer Dear all, I am wondering if the semantic result format for the region browser (http://en.openei.org/wiki/Browse_By_Region) is available for reuse. Could anyone point me to the developer of it? Thanks and best wishes, Timo Submitted by Timo.Kouwenhoven on 2 October, 2013 - 05:35 2 answers Points: 1 Timo, My apologies for the delayed response. The Semantic Result Format we used was a custom Raphael SVG mapping format we developed. While we're not easily able to release it, you can replicate the even better Google GeoCharts Result Format, which you can see here: http://en.openei.org/wiki/About_the_Smart_Grid For this, all we did was take the code for the Google GeoMaps Result Format and modify it to pass in the parameters and base URL necessary to access

30

API for browsing available data sources? | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

API for browsing available data sources? API for browsing available data sources? Safety Data/Tools Apps Challenges Resources Blogs Let's Talk Safety You are here Data.gov » Communities » Safety » Forums API for browsing available data sources? Submitted by G. Hussain Chinoy on Tue, 09/18/2012 - 4:46pm Log in to vote 2 The provided "Data/Tools" tab is a nice human readable view of the data resources on safety.data.gov, but is there an API to view the different data sources by category or any of the other attributes of a data set? Thanks Add new comment Your name Subject Comment * More information about text formats Plain text No HTML tags allowed. Web page addresses and e-mail addresses turn into links automatically. Lines and paragraphs break automatically. CAPTCHA This question is for testing whether you are a human visitor and to prevent

31

Browse by region (RaphaelSVGMap) | OpenEI Community  

Open Energy Info (EERE)

Browse by region (RaphaelSVGMap) Browse by region (RaphaelSVGMap) Home > Groups > Developer Dear all, I am wondering if the semantic result format for the region browser (http://en.openei.org/wiki/Browse_By_Region) is available for reuse. Could anyone point me to the developer of it? Thanks and best wishes, Timo Submitted by Timo.Kouwenhoven on 2 October, 2013 - 05:35 2 answers Points: 1 Timo, My apologies for the delayed response. The Semantic Result Format we used was a custom Raphael SVG mapping format we developed. While we're not easily able to release it, you can replicate the even better Google GeoCharts Result Format, which you can see here: http://en.openei.org/wiki/About_the_Smart_Grid For this, all we did was take the code for the Google GeoMaps Result Format and modify it to pass in the parameters and base URL necessary to access

32

White-tailed Deer Browse Preferences for South Texas and the Edwards Plateau  

E-Print Network (OSTI)

Deer prefer forbs, but these plants are not always available. Browse plants actually make up the major part of deer diets, and the specific browse plants deer eat depends on plant palatibility and availability. This publication explains deer...

Wright, Byron D.; Lyons, Robert K.; Cooper, Susan; Cathey, James

2003-01-06T23:59:59.000Z

33

ScentTrails: Integrating Browsing and Searching on the Web  

E-Print Network (OSTI)

. Searching is the process of entering a search query (usually a list of keywords) into a search engine, which are more appropriately termed by Jul and Furnas [1997] as "search by navigation" and "search by query," respectively, but we will use the more common terms "browsing" and "searching.") Authors' addresses: Chris

Chi, Ed Huai-hsin

34

Interaction differences in web search and browse logs Paul Thomas  

E-Print Network (OSTI)

differences in behaviour across users and sites. We observe similar overall characteristics to other browsing, Australia, 10 December 2010. Copyright for this article remains with the authors. Staff Public Intranet pages Intranet External pages Staff external Public Figure 1: We have three classes of interaction data

Thomas, Paul

35

Fast Browsing of Archived Web Contents Sangchul Song  

E-Print Network (OSTI)

and deep contents, web contents involve a wide variety of objects such as html pages, documents, multimediaFast Browsing of Archived Web Contents Sangchul Song Department of Electrical and Computer The web is becoming the preferred medium for communicating and storing information pertaining to almost

JaJa, Joseph F.

36

Measurement of Boundary-Layer Temperature Profiles by a Scanning 5-MM Radiometer During the 1999 Winter NSA/AAO Radiometer Exp  

NLE Websites -- All DOE Office Websites (Extended Search)

Boundary-Layer Temperature Profiles by Boundary-Layer Temperature Profiles by a Scanning 5-MM Radiometer During the 1999 Winter NSA/AAO Radiometer Experiment and WVIOP 2000 V. Y. Leuski and E. R. Westwater Cooperative Institute for Research in the Environmental Sciences National Oceanic and Atmospheric Administration Environmental Technology Laboratory University of Colorado Boulder, Colorado Introduction A scanning 5-mm-wavelength radiometer was deployed during two Intensive Operational Periods (IOPs) at the Atmospheric Radiation Measurement (ARM) Program's Cloud and Radiation Testbed (CART) facilities. The first was conducted at the North Slope of Alaska (NSA) and Adjacent arctic Ocean (AAO) site near Barrow, Alaska, during March 1999. One goal was to evaluate the ability of an

37

Use of ARM/NSA Data to Validate and Improve the Remote Sensing Retrieval of Cloud and Surface Properties in the Arctic from AVHRR Data  

NLE Websites -- All DOE Office Websites (Extended Search)

ARM/NSA Data to Validate and Improve the ARM/NSA Data to Validate and Improve the Remote Sensing Retrieval of Cloud and Surface Properties in the Arctic from AVHRR Data X. Xiong QSS Group, Inc. National Oceanic and Atmospheric Administration National Environmental Satellite, Data, and Information Service Office of Research and Applications Camp Springs, Maryland R. Storvold and C. Marty Geophysical Institute University of Alaska Fairbanks, Alaska K. H. Stamnes Stevens Institute of Technology Hoboken, New Jersey B. D. Zak Sandia National Laboratories Albuquerque, New Mexico Introduction Clouds in the Arctic have an important impact on the radiative energy balance. However, the effects of clouds still constitute one of the largest uncertainties in the study of climate change. Because the surface

38

Home | Login | Logout | Access Information | Ale Top 100 Documents BROWSE SEARCH IEEE XPLORE GUIDE  

E-Print Network (OSTI)

Home | Login | Logout | Access Information | Ale Top 100 Documents BROWSE SEARCH IEEE XPLORE GUIDE Information 1. Subtly different facial expression recognition and expressionintensity estimation Lien, J

Yang, Liuqing

39

E-Print Network 3.0 - analysis browsing server Sample Search...  

NLE Websites -- All DOE Office Websites (Extended Search)

>> 1 UBB Mining: Finding Unexpected Browsing Behaviour in Clickstream Data to Improve a Web Site's Design Summary: algorithm can discover the relationship between different user's...

40

c1a.xls  

Gasoline and Diesel Fuel Update (EIA)

Dec 2006 Next CBECS will be conducted in 2007 Primary Site All Buildings .................................... 4,859 71,658 6,523 10,746 3,559 2,100 228 636 District Heat Table C1A. Total Energy Consumption by Major Fuel for All Buildings, 2003 All Buildings Total Energy Consumption (trillion Btu) Number of Buildings (thousand) Floorspace (million square feet) Sum of Major Fuels Electricity Natural Gas Fuel Oil Climate Zone: 30-Year Average Under 2,000 CDD and -- More than 7,000 HDD ..................... 882 11,529 1,086 1,412 468 468 63 88 5,500-7,000 HDD ............................ 1,229 18,808 1,929 2,621 868 737 67 257 4,000-5,499 HDD ............................ 701 12,503 1,243 1,947 645 368 91 140 Fewer than 4,000 HDD ................... 1,336 17,630 1,386 2,686 890 389 6 101 2,000 CDD or More and --

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

c1a.xls  

Gasoline and Diesel Fuel Update (EIA)

October 2006 October 2006 Next CBECS will be conducted in 2007 Primary Site All Buildings .................................... 4,859 71,658 6,523 10,746 3,559 2,100 228 636 District Heat Table C1A. Total Energy Consumption by Major Fuel for All Buildings, 2003 All Buildings Total Energy Consumption (trillion Btu) Number of Buildings (thousand) Floorspace (million square feet) Sum of Major Fuels Electricity Natural Gas Fuel Oil Climate Zone: 30-Year Average Under 2,000 CDD and -- More than 7,000 HDD ..................... 882 11,529 1,086 1,412 468 468 63 88 5,500-7,000 HDD ............................ 1,229 18,808 1,929 2,621 868 737 67 257 4,000-5,499 HDD ............................ 701 12,503 1,243 1,947 645 368 91 140 Fewer than 4,000 HDD ................... 1,336 17,630 1,386 2,686 890 389 6 101 2,000 CDD or More and --

42

Effective Browsing and Serendipitous Discovery with an Experience-Infused Browser  

E-Print Network (OSTI)

Effective Browsing and Serendipitous Discovery with an Experience-Infused Browser Sudheendra Hangal explore how this recall can be leveraged during web browsing. We have built a system called the Experience-Infused, an experience-infused browser can enhance the effect of a user noticing personally relevant terms on a page

Pratt, Vaughan

43

NEST ALGEBRAS IN c1 Alvaro Arias*  

E-Print Network (OSTI)

NEST ALGEBRAS IN c1 by Alvaro Arias* ABSTRACT. In this paper we address some basic questions of the Banach space structure of the nest algebras in the trace class in particular, we study whether any two of them are isomorphic to each other, and show that the nest algebras in the trace class have bases. We

Arias, Alvaro

44

Cooperative Research in C1 Chemistry  

SciTech Connect

C1 chemistry refers to the conversion of simple carbon-containing materials that contain one carbon atom per molecule into valuable products. The feedstocks for C1 chemistry include natural gas, carbon dioxide, carbon monoxide, methanol and synthesis gas (a mixture of carbon monoxide and hydrogen). Synthesis gas, or syngas, is produced primarily by the reaction of natural gas, which is principally methane, with steam. It can also be produced by gasification of coal, petroleum coke, or biomass. The availability of syngas from coal gasification is expected to increase significantly in the future because of increasing development of integrated gasification combined cycle (IGCC) power generation. Because of the abundance of remote natural gas, the advent of IGCC, and environmental advantages, C1 chemistry is expected to become a major area of interest for the transportation fuel and chemical industries in the relatively near future. The CFFLS will therefore perform a valuable national service by providing science and engineering graduates that are trained in this important area. Syngas is the source of most hydrogen. Approximately 10 trillion standard cubic feet (SCF) of hydrogen are manufactured annually in the world. Most of this hydrogen is currently used for the production of ammonia and in a variety of refining and chemical operations. However, utilization of hydrogen in fuel cells is expected to grow significantly in the next century. Syngas is also the feedstock for all methanol and Fischer-Tropsch plants. Currently, world consumption of methanol is over 25 million tons per year. There are many methanol plants in the U.S. and throughout the world. Methanol and oxygenated transportation fuel products play a significant role in the CFFLS C1 program. Currently, the only commercial Fischer-Tropsch plants are overseas, principally in South Africa (SASOL). However, new plants are being built or planned for a number of locations. One possible location for future F-T plant development in the U.S. is in the Alaskan oil fields.

Gerald P. Huffman

2000-10-27T23:59:59.000Z

45

TiDi Browser: A Novel Photo Browsing Technique for Mobile Gerald Biebera, Christian Tominskib, and Bodo Urbanb  

E-Print Network (OSTI)

TiDi Browser: A Novel Photo Browsing Technique for Mobile Devices Gerald Biebera, Christian's digital photos can be tagged with information about when and where they were taken. On stationary computers, this information is often used to drive photo browsing. This is not the case for mobile devices

Tominski, Christian

46

COOPERATIVE RESEARCH IN C1 CHEMISTRY  

SciTech Connect

Faculty and students from five universities (Kentucky, West Virginia, Utah, Pittsburgh and Auburn) are collaborating on a basic research program to develop novel C1 chemistry processes for the production of clean, high quality transportation fuel. An Industrial Advisory Board (IAB) with members from Chevron, Eastman Chemical, Energy International, Teir Associates, and the Department of Defense has been formed to provide practical guidance to the program. The program has two principal objectives. (1) Develop technology for conversion of C1 source materials (natural gas, synthesis gas, carbon dioxide and monoxide, and methanol) into clean, high efficiency transportation fuel. (2) Develop novel processes for producing hydrogen from natural gas and other hydrocarbons. Some of the principal accomplishments of the program in its first two years are: (1) The addition of acetylenic compounds in Fischer-Tropsch synthesis is found to produce significant amounts of oxygenated products in FT diesel fuels. Such oxygenated products should decrease particulate matter (PM) emissions. (2) Nanoscale, binary, Fe-based catalysts supported on alumina have been shown to have significant activity for the decomposition of methane into pure hydrogen and potentially valuable multi-walled carbon nanotubes. (3) Catalytic synthesis processes have been developed for synthesis of diethyl carbonate, higher ethers, and higher alcohols from C1 source materials. Testing of the effect of adding these oxygenates to diesel fuel on PM emissions has begun using a well-equipped small diesel engine test facility. (4) Supercritical fluid (SCF) FT synthesis has been conducted under SCF hexane using both Fe and Co catalysts. There is a marked effect on the hydrocarbon product distribution, with a shift to higher carbon number products. These and other results are summarized.

Gerald P. Huffman

2001-04-30T23:59:59.000Z

47

Semantic Web Portal: A Platform for Better Browsing and Visualizing Semantic Data  

E-Print Network (OSTI)

Semantic Web Portal: A Platform for Better Browsing and Visualizing Semantic Data Ying Ding1 of the Semantic Web. In this paper, we propose the Semantic Web Portal (SWP) as a light-weight platform portal, a patient health center portal and a Linked Open Data portal for bio-chemical data. SWP can

Menczer, Filippo

48

Browse by Discipline -- Subject Pathways for the E-print Network -- Energy,  

Office of Scientific and Technical Information (OSTI)

Browse by Discipline These pages contain links to thousands of servers, sites, and documents contributed by individual authors that contain e-print information in discipline areas of interest to the Department of Energy's research activities. These resources are organized into discipline-specific categories as indicated below. To view these resources and sites, simply select a discipline, browse the entries listed in alphabetical order, and click on any entry to leave the discipline you selected and enter a specific website. Use the "Back" button to return to the E-print Discipline you exited from. Biology and Medicine Biotechnology Computer Technologies and Information Sciences Chemistry Energy Storage, Conversion and Utilization Engineering Environmental Management and Restoration Technologies

49

Failure and Redemption of Multifilter Rotating Shadowband Radiometer (MFRSR)/Normal Incidence Multifilter Radiometer (NIMFR) Cloud Screening: Contrasting Algorithm Performance at Atmospheric Radiation Measurement (ARM) North Slope of Alaska (NSA) and Southern Great Plains (SGP) Sites  

SciTech Connect

Well-known cloud-screening algorithms, which are designed to remove cloud-contaminated aerosol optical depths (AOD) from AOD measurements, have shown great performance at many middle-to-low latitude sites around the world. However, they may occasionally fail under challenging observational conditions, such as when the sun is low (near the horizon) or when optically thin clouds with small spatial inhomogeneity occur. Such conditions have been observed quite frequently at the high-latitude Atmospheric Radiation Measurement (ARM) North Slope of Alaska (NSA) sites. A slightly modified cloud-screening version of the standard algorithm is proposed here with a focus on the ARM-supported Multifilter Rotating Shadowband Radiometer (MFRSR) and Normal Incidence Multifilter Radiometer (NIMFR) data. The modified version uses approximately the same techniques as the standard algorithm, but it additionally examines the magnitude of the slant-path line of sight transmittance and eliminates points when the observed magnitude is below a specified threshold. Substantial improvement of the multi-year (1999-2012) aerosol product (AOD and its Angstrom exponent) is shown for the NSA sites when the modified version is applied. Moreover, this version reproduces the AOD product at the ARM Southern Great Plains (SGP) site, which was originally generated by the standard cloud-screening algorithms. The proposed minor modification is easy to implement and its application to existing and future cloud-screening algorithms can be particularly beneficial for challenging observational conditions.

Kassianov, Evgueni I.; Flynn, Connor J.; Koontz, Annette S.; Sivaraman, Chitra; Barnard, James C.

2013-09-11T23:59:59.000Z

50

Navigate MathSciNet Jump to Search or Browse Screens  

E-Print Network (OSTI)

, 455­467. 58F11 (58F18) References: 0 Reference Citations: 1 Review Citations: 0 For a C1+ -action (0

Hurder, Steven

51

Browsing and Keyword-Based Profiles: A Cautionary Tale Michael Shepherd, Carolyn Watters, Jack Duffy and Raj Kaushik  

E-Print Network (OSTI)

Browsing and Keyword-Based Profiles: A Cautionary Tale Michael Shepherd, Carolyn Watters, Jack Duffy and Raj Kaushik Faculty of Computer Science Dalhousie University Halifax, Nova Scotia, Canada B3H 1W5 {shepherd | watters | kaushik} @cs.dal.ca jack.duffy@dal.ca Abstract In this research, adaptive

Shepherd, Mike

52

"RSE Table C1.1. Relative Standard Errors for Table C1.1;"  

U.S. Energy Information Administration (EIA) Indexed Site

.1. Relative Standard Errors for Table C1.1;" .1. Relative Standard Errors for Table C1.1;" " Unit: Percents." " "," "," "," "," "," "," "," "," "," "," " " "," ","Any",," "," ",," "," ",," ","Shipments" "NAICS"," ","Energy","Net","Residual","Distillate",,"LPG and",,"Coke and"," ","of Energy Sources" "Code(a)","Subsector and Industry","Source(b)","Electricity(c)","Fuel Oil","Fuel Oil(d)","Natural Gas(e)","NGL(f)","Coal","Breeze","Other(g)","Produced Onsite(h)"

53

Neutron scattering studies of the isolated C1r2C1s2 subunit of first component of human complement in solution  

Science Journals Connector (OSTI)

Neutron scattering studies of the isolated C1r2C1s2...was investigated by small-angle neutron scattering in both the activated and unactivated...ultracentrifugation and electron microscopy data. Neutron scattering studies of the isolated C1r2C1s2...

J Boyd; D R Burton; S J Perkins; C L Villiers; R A Dwek; G J Arlaud

1983-01-01T23:59:59.000Z

54

LM2940/LM2940C 1A Low Dropout Regulator  

E-Print Network (OSTI)

LM2940/LM2940C 1A Low Dropout Regulator General Description The LM2940/LM2940C positive voltage the regulator is in the dropout mode (VIN - VOUT 3V). Designed also for vehicular applications, the LM2940/ LM circuits and the load. The LM2940/ LM2940C cannot be harmed by temporary mirror-image in- sertion. Familiar

Berns, Hans-Gerd

55

Quantification and comparison of terpene concentrations in various balsam fir growth forms and foliage ages, and a simulation of moose browsing on balsam fir trees at Isle Royale  

E-Print Network (OSTI)

pressure are approximately similar (2A% difference) to those reported in a study of white-tailed deer (Odocolleus virginianus) browsing on eastern hemlock (Tsuga canadentis), balsam fir, and 4 deciduous species in Wisconsin (Anderson and Katz 1993), 28... pressure are approximately similar (2A% difference) to those reported in a study of white-tailed deer (Odocolleus virginianus) browsing on eastern hemlock (Tsuga canadentis), balsam fir, and 4 deciduous species in Wisconsin (Anderson and Katz 1993), 28...

Terra-Berns, Mary Helen

2012-06-07T23:59:59.000Z

56

Observation of $?_{c1}$ decays into vector meson pairs $??$, $??$, and $??$  

E-Print Network (OSTI)

Decays of $\\chi_{c1}$ to vector meson pairs $\\phi\\phi$, $\\omega\\omega$ and $\\omega\\phi$ are observed for the first time using $(106\\pm4)\\times 10^6$ $\\psip$ events accumulated at the BESIII detector at the BEPCII $e^+e^-$ collider. The branching fractions are measured to be $(4.4\\pm 0.3\\pm 0.5)\\times 10^{-4}$, $(6.0\\pm 0.3\\pm 0.7)\\times 10^{-4}$, and $(2.2\\pm 0.6\\pm 0.2)\\times 10^{-5}$, for $\\chi_{c1}\\to \\phi\\phi$, $\\omega\\omega$, and $\\omega\\phi$, respectively. The observation of $\\chi_{c1}$ decays into a pair of vector mesons $\\phi\\phi$, $\\omega\\omega$ and $\\omega\\phi$ indicates that the hadron helicity selection rule is significantly violated in $\\chi_{cJ}$ decays. In addition, the measurement of $\\chi_{cJ}\\to \\omega\\phi$ gives the rate of doubly OZI-suppressed decay. Branching fractions for $\\chi_{c0}$ and $\\chi_{c2}$ decays into other vector meson pairs are also measured with improved precision.

M. Ablikim; M. N. Achasov; L. An; Q. An; Z. H. An; J. Z. Bai; R. Baldini; Y. Ban; J. Becker; N. Berger; M. Bertani; J. M. Bian; O. Bondarenko; I. Boyko; R. A. Briere; V. Bytev; X. Cai; G. F. Cao; X. X. Cao; J. F. Chang; G. Chelkova; G. Chen; H. S. Chen; J. C. Chen; M. L. Chen; S. J. Chen; Y. Chen; Y. B. Chen; H. P. Cheng; Y. P. Chu; D. Cronin-Hennessy; H. L. Dai; J. P. Dai; D. Dedovich; Z. Y. Deng; I. Denysenkob; M. Destefanis; Y. Ding; L. Y. Dong; M. Y. Dong; S. X. Du; M. Y. Duan; R. R. Fan; J. Fang; S. S. Fang; C. Q. Feng; C. D. Fu; J. L. Fu; Y. Gao; C. Geng; K. Goetzen; W. X. Gong; M. Greco; S. Grishin; M. H. Gu; Y. T. Gu; Y. H. Guan; A. Q. Guo; L. B. Guo; Y. P. Guo; X. Q. Hao; F. A. Harris; K. L. He; M. He; Z. Y. He; Y. K. Heng; Z. L. Hou; H. M. Hu; J. F. Hu; T. Hu; B. Huang; G. M. Huang; J. S. Huang; X. T. Huang; Y. P. Huang; T. Hussain; C. S. Ji; Q. Ji; X. B. Ji; X. L. Ji; L. K. Jia; L. L. Jiang; X. S. Jiang; J. B. Jiao; Z. Jiao; D. P. Jin; S. Jin; F. F. Jing; M. Kavatsyuk; S. Komamiya; W. Kuehn; J. S. Lange; J. K. C. Leung; Cheng Li; Cui Li; D. M. Li; F. Li; G. Li; H. B. Li; J. C. Li; Lei Li; N. B. Li; Q. J. Li; W. D. Li; W. G. Li; X. L. Li; X. N. Li; X. Q. Li; X. R. Li; Z. B. Li; H. Liang; Y. F. Liang; Y. T. Liang; G. R Liao; X. T. Liao; B. J. Liu; B. J. Liu; C. L. Liu; C. X. Liu; C. Y. Liu; F. H. Liu; Fang Liu; Feng Liu; G. C. Liu; H. Liu; H. B. Liu; H. M. Liu; H. W. Liu; J. P. Liu; K. Liu; K. Y Liu; Q. Liu; S. B. Liu; X. Liu; X. H. Liu; Y. B. Liu; Y. W. Liu; Yong Liu; Z. A. Liu; Z. Q. Liu; H. Loehner; G. R. Lu; H. J. Lu; J. G. Lu; Q. W. Lu; X. R. Lu; Y. P. Lu; C. L. Luo; M. X. Luo; T. Luo; X. L. Luo; C. L. Ma; F. C. Ma; H. L. Ma; Q. M. Ma; T. Ma; X. Ma; X. Y. Ma; M. Maggiora; Q. A. Malik; H. Mao; Y. J. Mao; Z. P. Mao; J. G. Messchendorp; J. Min; R. E. Mitchell; X. H. Mo; N. Yu. Muchnoi; Y. Nefedov; Z. Ning; S. L. Olsen; Q. Ouyang; S. Pacetti; M. Pelizaeus; K. Peters; J. L. Ping; R. G. Ping; R. Poling; C. S. J. Pun; M. Qi; S. Qian; C. F. Qiao; X. S. Qin; J. F. Qiu; K. H. Rashid; G. Rong; X. D. Ruan; A. Sarantsevc; J. Schulze; M. Shao; C. P. Shen; X. Y. Shen; H. Y. Sheng; M. R. Shepherd; X. Y. Song; S. Sonoda; S. Spataro; B. Spruck; D. H. Sun; G. X. Sun; J. F. Sun; S. S. Sun; X. D. Sun; Y. J. Sun; Y. Z. Sun; Z. J. Sun; Z. T. Sun; C. J. Tang; X. Tang; X. F. Tang; H. L. Tian; D. Toth; G. S. Varner; X. Wan; B. Q. Wang; K. Wang; L. L. Wang; L. S. Wang; M. Wang; P. Wang; P. L. Wang; Q. Wang; S. G. Wang; X. L. Wang; Y. D. Wang; Y. F. Wang; Y. Q. Wang; Z. Wang; Z. G. Wang; Z. Y. Wang; D. H. Wei; Q. G. Wen; S. P. Wen; U. Wiedner; L. H. Wu; N. Wu; W. Wu; Z. Wu; Z. J. Xiao; Y. G. Xie; G. F. Xu; G. M. Xu; H. Xu; Y. Xu; Z. R. Xu; Z. Z. Xu; Z. Xue; L. Yan; W. B. Yan; Y. H. Yan; H. X. Yang; M. Yang; T. Yang; Y. Yang; Y. X. Yang; M. Ye; M. H. Ye; B. X. Yu; C. X. Yu; L. Yu; C. Z. Yuan; W. L. Yuan; Y. Yuan; A. A. Zafar; A. Zallo; Y. Zeng; B. X. Zhang; B. Y. Zhang; C. C. Zhang; D. H. Zhang; H. H. Zhang; H. Y. Zhang; J. Zhang; J. W. Zhang; J. Y. Zhang; J. Z. Zhang; L. Zhang; S. H. Zhang; T. R. Zhang; X. J. Zhang; X. Y. Zhang; Y. Zhang; Y. H. Zhang; Z. P. Zhang; Z. Y. Zhang; G. Zhao; H. S. Zhao; Jiawei Zhao; Jingwei Zhao; Lei Zhao; Ling Zhao; M. G. Zhao; Q. Zhao; S. J. Zhao; T. C. Zhao; X. H. Zhao; Y. B. Zhao; Z. G. Zhao; Z. L. Zhao; A. Zhemchugova; B. Zheng; J. P. Zheng; Y. H. Zheng; Z. P. Zheng; B. Zhong; J. Zhong; L. Zhong; L. Zhou; X. K. Zhou; X. R. Zhou; C. Zhu; K. Zhu; K. J. Zhu; S. H. Zhu; X. L. Zhu; X. W. Zhu; Y. S. Zhu; Z. A. Zhu; J. Zhuang; B. S. Zou; J. H. Zou; J. X. Zuo; P. Zweber

2011-04-27T23:59:59.000Z

57

Amplitude analyses of the decays chi_c1 -> eta pi+ pi- and chi_c1 -> eta' pi+ pi-  

E-Print Network (OSTI)

Using a data sample of 2.59 x 10^7 psi(2S) decays obtained with the CLEO-c detector, we perform amplitude analyses of the complementary decay chains chi_c1 -> eta pi+ pi- and chi_c1 -> eta' pi+ pi-. We find evidence for a P-wave eta' pi scattering amplitude, which, if interpreted as a resonance, would have exotic J^PC = 1^-+ and parameters consistent with the pi_1(1600) state reported in other production mechanisms. We also make the first observation of the decay a_0(980) -> eta' pi and measure the ratio of branching fractions B(a_0(980) -> eta' pi)/B(a_0(980) -> eta pi) = 0.064 +- 0.014 +- 0.014. The pi pi spectrum produced with a recoiling eta is compared to that with eta' recoil.

CLEO Collaboration; G. S. Adams; J. Napolitano; K. M. Ecklund; J. Insler; H. Muramatsu; C. S. Park; L. J. Pearson; E. H. Thorndike; S. Ricciardi; C. Thomas; M. Artuso; S. Blusk; R. Mountain; T. Skwarnicki; S. Stone; L. M. Zhang; G. Bonvicini; D. Cinabro; A. Lincoln; M. J. Smith; P. Zhou; J. Zhu; P. Naik; J. Rademacker; D. M. Asner; K. W. Edwards; K. Randrianarivony; G. Tatishvili; R. A. Briere; H. Vogel; P. U. E. Onyisi; J. L. Rosner; J. P. Alexander; D. G. Cassel; S. Das; R. Ehrlich; L. Gibbons; S. W. Gray; D. L. Hartill; B. K. Heltsley; D. L. Kreinick; V. E. Kuznetsov; J. R. Patterson; D. Peterson; D. Riley; A. Ryd; A. J. Sadoff; X. Shi; W. M. Sun; J. Yelton; P. Rubin; N. Lowrey; S. Mehrabyan; M. Selen; J. Wiss; J. Libby; M. Kornicer; R. E. Mitchell; M. R. Shepherd; A. Szczepaniak; D. Besson; T. K. Pedlar; D. Cronin-Hennessy; J. Hietala; S. Dobbs; Z. Metreveli; K. K. Seth; A. Tomaradze; T. Xiao; L. Martin; A. Powell; G. Wilkinson; J. Y. Ge; D. H. Miller; I. P. J. Shipsey; B. Xin

2011-09-27T23:59:59.000Z

58

c1ee02112e 1..8  

NLE Websites -- All DOE Office Websites (Extended Search)

monoclonal monoclonal antibodies to investigate plant cell wall deconstruction for biofuels production† Jaclyn D. DeMartini, abe Sivakumar Pattathil, ce Utku Avci, ce Kaitlyn Szekalski, c Koushik Mazumder, ce Michael G. Hahn cde and Charles E. Wyman * abe Received 10th July 2011, Accepted 17th August 2011 DOI: 10.1039/c1ee02112e To better understand how hydrothermal pretreatment reduces plant cell wall recalcitrance, we applied a high throughput approach (''glycome profiling'') using a comprehensive suite of plant glycan-directed monoclonal antibodies to monitor structural/extractability changes in Populus biomass. The results of glycome profiling studies were verified by immunolabeling using selected antibodies from the same toolkit. The array of monoclonal antibodies employed in these studies is large enough to monitor changes occurring in most plant cell wall polysaccharides.

59

JOURNAL DE PHYSIQUE Colloque C 1, Supplkment au no 2, Tome 28, Fivrier 1967 page C 1-157 HYPERSONIC WAVES IN DIELECTRIC CRYSTALS  

E-Print Network (OSTI)

JOURNAL DE PHYSIQUE Colloque C 1, Supplkment au no 2, Tome 28, Fivrier 1967 page C 1-157 HYPERSONIC in this issue. I. Generation and Detection of Hypersonic Wawes. -One of the simplest means to excite ultrasonic in the hypersonic range relatively thick quartz plates are used in a rather high overtone. This piezoelectric plate

Paris-Sud XI, Université de

60

Data:7b072f6c-1c1c-4038-9b36-4ca5c20b982a | Open Energy Information  

Open Energy Info (EERE)

c-1c1c-4038-9b36-4ca5c20b982a c-1c1c-4038-9b36-4ca5c20b982a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Elec & Gas Co Effective date: 2010/06/07 End date if known: Rate name: 100 WATT METAL HALIDE Sector: Lighting Description: Source or reference: http://www.pseg.com/family/pseandg/tariffs/electric/pdf/electric_tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Side 1 av 3 AoC1 underskelse hsten 2006 Innledende test  

E-Print Network (OSTI)

Side 1 av 3 AoC1 undersøkelse høsten 2006 ­ Innledende test Noter test-person-nr.her: [ _____ ] Du

Natvig, Lasse

62

Side 1 av 3 AoC1 underskelse hsten 2006 Avsluttende test  

E-Print Network (OSTI)

Side 1 av 3 AoC1 undersøkelse høsten 2006 ­ Avsluttende test Noter test-person-nr.her: [ _____ ] Du

Natvig, Lasse

63

ARM - VAP Product - armbecldrad  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsarmbearmbecldrad Productsarmbearmbecldrad Documentation Data Management Facility Plots (Quick Looks) Citation DOI: 10.5439/1095314 DOI: 10.5439/1039926 Central Facility, Lamont, OK (SGP C1) DOI: 10.5439/1039927 Central Facility, Barrow AK (NSA C1) DOI: 10.5439/1039928 Central Facility, Manus I., PNG (TWP C1) DOI: 10.5439/1039929 Central Facility, Nauru Island (TWP C2) DOI: 10.5439/1039930 Central Facility, Darwin, Australia (TWP C3) [ What is this? ] Generate Citation ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP Output : ARMBECLDRAD ARMBE: Cloud Radiation measurements Active Dates 1996.01.01 - 2011.01.01 Originating VAP Process ARM Best Estimate Data Products : ARMBE Description The ARMBE Cloud Radiation (ARMBECLDRAD) VAP contains a best estimate of

64

ARM - VAP Product - armbeatm  

NLE Websites -- All DOE Office Websites (Extended Search)

Productsarmbearmbeatm Productsarmbearmbeatm Documentation Data Management Facility Plots (Quick Looks) Citation DOI: 10.5439/1095313 DOI: 10.5439/1039931 Central Facility, Lamont, OK (SGP C1) DOI: 10.5439/1039932 Central Facility, Barrow AK (NSA C1) DOI: 10.5439/1039933 Central Facility, Manus I., PNG (TWP C1) DOI: 10.5439/1039934 Central Facility, Nauru Island (TWP C2) DOI: 10.5439/1039935 Central Facility, Darwin, Australia (TWP C3) [ What is this? ] Generate Citation ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send VAP Output : ARMBEATM ARMBE: Atmospheric measurements Active Dates 1994.01.01 - 2012.12.31 Originating VAP Process ARM Best Estimate Data Products : ARMBE Description The ARM Best Estimate Atmospheric Measurements (ARMBEATM) value-added

65

ARM - Site Instruments  

NLE Websites -- All DOE Office Websites (Extended Search)

AlaskaInstruments AlaskaInstruments NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts Instruments : North Slope Alaska [ Single installation ] AERI Atmospheric Emitted Radiance Interferometer Radiometric Browse Plots Browse Data [ Single installation ] AMC Ameriflux Measurement Component Radiometric, Surface/Subsurface Properties Browse Data [ Single installation ] AOS Aerosol Observing System Aerosols Browse Data [ Single installation ] CCN Cloud Condensation Nuclei Particle Counter Aerosols Browse Data [ Single installation ] CLAP Continuous Light Absorption Photometer Aerosols Browse Data [ Single installation ] CPC Condensation Particle Counter Aerosols Browse Data

66

Data:13ee2c1b-e3c1-4180-a872-4527d32e98fd | Open Energy Information  

Open Energy Info (EERE)

c1b-e3c1-4180-a872-4527d32e98fd c1b-e3c1-4180-a872-4527d32e98fd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ninnescah Rural E C A Inc Effective date: 2012/03/01 End date if known: Rate name: Idle Line Retention (IS) Sector: Commercial Description: To customers who have fulfilled the terms of the contract for service and who have no immediate need for electric service but do desire to have the electric line left in place for future use. Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

67

Data:62cb00c1-1b7b-448f-b627-384c1cba8e2c | Open Energy Information  

Open Energy Info (EERE)

0c1-1b7b-448f-b627-384c1cba8e2c 0c1-1b7b-448f-b627-384c1cba8e2c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Farmers Electric Company, Ltd Effective date: 2012/06/01 End date if known: Rate name: Security Lights- 400W Metal Halide Sector: Lighting Description: Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

68

Observation of the h_c(1P) using e^+e^- collisions above DDbar threshold  

E-Print Network (OSTI)

Using 586pb^-1 of e^+e^- collision data at E_CM = 4170MeV, produced at the CESR collider and collected with the CLEO-c detector, we observe the process e^+e^- --> pi^+ pi^- h_c(1P). We measure its cross section to be 15.6+-2.3+-1.9+-3.0pb, where the third error is due to the external uncertainty on the branching fraction of psi(2S) --> pi^0 h_c(1P), which we use for normalization. We also find evidence for e^+e^- --> eta h_c(1P) at 4170MeV at the 3sigma level, and see hints of a rise in the e^+e^- --> pi^+ pi^- h_c(1P) cross section at 4260MeV.

CLEO Collaboration; T. K. Pedlar; D. Cronin-Hennessy; J. Hietala; S. Dobbs; Z. Metreveli; K. K. Seth; A. Tomaradze; T. Xiao; L. Martin; A. Powell; G. Wilkinson; H. Mendez; J. Y. Ge; D. H. Miller; I. P. J. Shipsey; B. Xin; G. S. Adams; D. Hu; B. Moziak; J. Napolitano; K. M. Ecklund; J. Insler; H. Muramatsu; C. S. Park; L. J. Pearson; E. H. Thorndike; S. Ricciardi; C. Thomas; M. Artuso; S. Blusk; R. Mountain; T. Skwarnicki; S. Stone; L. M. Zhang; G. Bonvicini; D. Cinabro; A. Lincoln; M. J. Smith; P. Zhou; J. Zhu; P. Naik; J. Rademacker; D. M. Asner; K. W. Edwards; K. Randrianarivony; G. Tatishvili; R. A. Briere; H. Vogel; P. U. E. Onyisi; J. L. Rosner; J. P. Alexander; D. G. Cassel; S. Das; R. Ehrlich; L. Gibbons; S. W. Gray; D. L. Hartill; B. K. Heltsley; D. L. Kreinick; V. E. Kuznetsov; J. R. Patterson; D. Peterson; D. Riley; A. Ryd; A. J. Sadoff; X. Shi; W. M. Sun; J. Yelton; P. Rubin; N. Lowrey; S. Mehrabyan; M. Selen; J. Wiss; J. Libby; M. Kornicer; R. E. Mitchell; M. R. Shepherd; C. M. Tarbert; D. Besson

2011-04-11T23:59:59.000Z

69

C1-Approximationof Seafloor Surfaces With Large Variations Christian Gout' and Dimitri Komatitsch2  

E-Print Network (OSTI)

C1-Approximationof Seafloor Surfaces With Large Variations Christian Gout' and Dimitri Komatitsch2 ' Department of Applied Mathematics, IJniversit6 de Pau, E.R.S. 2055-CNRS, 64000 Pau, France, Christian.gout

Komatitsch, Dimitri

70

Tips for Daylighting - Browse  

NLE Websites -- All DOE Office Websites (Extended Search)

Tips for Daylighting with Windows Tips for Daylighting with Windows These guidelines provide an integrated approach to the cost-effective design of perimeter zones in new commercial buildings. They function as a quick reference for designers through a set of easy steps and rules-of-thumb, emphasizing "how-to" practical details. References are given to more detailed sources of information, should the reader wish to go further. No guidelines can answer all possible questions from all types of users. However, this document addresses the most commonly occurring scenarios. The guidance here is limited by the medium; short paper documents can only go so far in assisting a designer with a unique project. This document has been carefully shaped to best meet the needs of a designer when time does not permit a more extensive form of assistance.

71

Browsing the Web  

Science Journals Connector (OSTI)

Amazon Silk is the name of the new web browser, run on Amazon Web Services (AWS), for the Kindle Fire...

Kevin Wilson

2014-01-01T23:59:59.000Z

72

Heterogeneous Nuclear Ribonucleoprotein C1/C2 Controls the Metastatic Potential of Glioblastoma by Regulating PDCD4  

Science Journals Connector (OSTI)

...Articles Heterogeneous Nuclear Ribonucleoprotein C1...b Samsung Biomedical Research Institute, Samsung...Korea e Cancer Stem Cell Research Center and Department...with the tumor grade. Programmed cell death 4 (PDCD4...role of heterogeneous nuclear ribonucleoprotein C1...

Young Mi Park; Su Jin Hwang; Kiyoshi Masuda; Kyung-Min Choi; Mi-Ran Jeong; Do-Hyun Nam; Myriam Gorospe; Hyeon Ho Kim

2012-08-20T23:59:59.000Z

73

Data:C1ff7297-450d-48c1-b06c-e44d68dd8914 | Open Energy Information  

Open Energy Info (EERE)

297-450d-48c1-b06c-e44d68dd8914 297-450d-48c1-b06c-e44d68dd8914 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Princeton, Wisconsin (Utility Company) Effective date: 2006/09/14 End date if known: Rate name: Cp-1 Small Power Service Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0524 per kilowatt-hour.

74

November 2002 15th TOFE, Washington, D.C. 1 Thermal Behavior and Operating  

E-Print Network (OSTI)

November 2002 15th TOFE, Washington, D.C. 1 Thermal Behavior and Operating Requirements of IFE Washington, D.C. November 2002 #12;November 2002 15th TOFE, Washington, D.C. 2 Abstract During injection the thermal behavior of the target under such conditions and explores possible ways of extending the target

Raffray, A. René

75

Comparative LCAO-LAPW study of C1 chemisorption on the Ag(001) surface  

Science Journals Connector (OSTI)

A comparison is made between the results of self-consistent linear-combination-of-atomic-orbitals and linear-augmented-plane-wave calculations for a clean three-layer Ag(001) slab and one with adsorbed C1 in c(22) simple-overlayer and mixed-layer geometries.

D. R. Hamann, L. F. Mattheiss, and H. S. Greenside

1981-11-15T23:59:59.000Z

76

Percolation on Strings and the Cover-up of the c=1 Disaster  

E-Print Network (OSTI)

We study percolation on the worldsheets of string theory for $c=0,1/2,1$ and $2$. For $c 1$. It thus appears likely that simulations for $c=2,3 \\ldots$ on numerically accessible lattices will fail to even capture the qualitative behavior of the continuum limit.

Geoffrey Harris

1993-10-20T23:59:59.000Z

77

Cleanup Verification Package for the 118-C-1, 105-C Solid Waste Burial Ground  

SciTech Connect

This cleanup verification package documents completion of remedial action for the 118-C-1, 105-C Solid Waste Burial Ground. This waste site was the primary burial ground for general wastes from the operation of the 105-C Reactor and received process tubes, aluminum fuel spacers, control rods, reactor hardware, spent nuclear fuel and soft wastes.

M. J. Appel and J. M. Capron

2007-07-25T23:59:59.000Z

78

Gille-SIO 221C 1 Syllabus: SIO 221C, Data Analysis Laboratory  

E-Print Network (OSTI)

: Data Reduction and Error Analysis for the Physical Sciences. McGraw Hill, 320 pp. Daley, R., 1991Gille-SIO 221C 1 Syllabus: SIO 221C, Data Analysis Laboratory Sarah Gille Class Meetings: Tuesday: Students refine data analysis skills by carrying out projects that employ specific techniques

Gille, Sarah T.

79

GRR/Elements/18-CA-c.1 - What Level of Hazardous Waste Facility Permit Does  

Open Energy Info (EERE)

GRR/Elements/18-CA-c.1 - What Level of Hazardous Waste Facility Permit Does GRR/Elements/18-CA-c.1 - What Level of Hazardous Waste Facility Permit Does the Facility Require < GRR‎ | Elements Jump to: navigation, search Edit 18-CA-b.1 - What Level of Hazardous Waste Facility Permit Does the Facility Require California employs a five-tier permitting program which imposes regulatory requirements matching the degree of risk posed by the level of hazardous waste: * The Full Permit Tier includes all facilities requiring a RCRA permit as well as selected non-RCRA activities under Title 22 California Code of Regulations. * The Standardized Permit Tier includes facilities that manage waste not regulated by RCRA, but regulated as hazardous waste in California. * Onsite Treatment Permits (3-Tiered) includes onsite treatment of non-RCRA waste regulated in California.

80

Crystallization and preliminary X-ray analysis of CYP153C1 from Novosphingobium aromaticivorans DSM12444  

Science Journals Connector (OSTI)

The expression, purification and preliminary crystallographic analysis of CYP153C1, an alkane-binding cytochrome P450 enzyme, are reported.

Zhou, R.

2011-07-27T23:59:59.000Z

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

JOURNAL DE PHYSIQUE Colloque C 1, supplbment au no 2-3, Tome 32, Fkvrier-Mars 1971,page C 1 -62 THE ULTRASONIC LOSS OF MANGANESE FERRITES (Mn,Fe, -,04)  

E-Print Network (OSTI)

JOURNAL DE PHYSIQUE Colloque C 1, supplbment au no 2-3, Tome 32, Fkvrier-Mars 1971,page C 1 - 62 Eindhoven. The Netherlands (") Rksumk. -Des mesures de pertes ultrasoniques ont bt6 effectuhs sur des with the Royal Netherlands Naval College. Den Helder. The Netherlands. FIG.2. -The frequency as a function

Paris-Sud XI, Université de

82

Activation of Different C1 Currents in XenopusOocytes by Ca Liberated from Stores and by Capacitative Ca Influx  

E-Print Network (OSTI)

Activation of Different C1 Currents in XenopusOocytes by Ca Liberated from Stores and by Capacitative Ca Influx H. CRISS HARTZELL From the Department of Anatomy and Cell Biology, Emoly University for studying Ca signaling. The purpose of this study was to characterize in detail the Ca-activated C1 currents

83

An evaluation of fusion gain in the compact helical fusion reactor FFHR-c1  

Science Journals Connector (OSTI)

A new procedure to predict achievable fusion gain in a sub-ignition fusion reactor is proposed. This procedure uses the direct profile extrapolation (DPE) method based on the gyro-Bohm model. The DPE method has been developed to predict the radial profiles in a fusion reactor sustained without auxiliary heating (i.e., in the self-ignition state) from the experimental data. To evaluate the fusion gain in a fusion reactor sustained with auxiliary heating (i.e., in the sub-ignition state), the DPE method is modified to include the influence of the auxiliary heating. The beta scale factor from experiment to reactor is assumed to be 1. Under this assumption, it becomes reasonable to apply the magnetohydrodynamic (MHD) equilibrium (which is calculated to reproduce the experimental data) to the reactor. At the same time, the MHD stability of the reactor plasma is also guaranteed to a certain extent since that beta was already proven in the experiment. The fusion gain in the helical type nuclear test machine FFHR-c1 has been evaluated using this modified DPE method. FFHR-c1 is basically a large duplication of the Large Helical Device (LHD) with a scale factor of 10/3, which corresponds to the major radius of the helical coils of 13.0m and the plasma volume of ~1000m3. Two options with different magnetic field strengths are considered. The fusion gain in FFHR-c1 extrapolated from a set of radial profile data obtained in LHD ranges from 1 to 7, depending on the profiles used together with the assumptions of the magnetic field strength and the alpha heating efficiency.

J. Miyazawa; T. Goto; R. Sakamoto; A. Sagara; the FFHR Design Group

2014-01-01T23:59:59.000Z

84

Modified pseudomonas oleovorans phaC1 nucleic acids encoding bispecific polyhydroxyalkanoate polymerase  

DOE Patents (OSTI)

A genetically engineered Pseudomonas oleovorans phaC1 polyhydroxyalkanoate (PHA) polymerase having tailored substrate specificity is provided. The modified PHA polymerase is preferably a "bispecific" PHA polymerase capable of copolymerizing a short chain length monomer and a medium chain length monomer is provided. Methods for making the modified PHA polymerase and for making nucleic acids encoding the modified PHA polymerase are also disclosed, as are methods of producing PHA using the modified PHA polymerase. The invention further includes methods to assay for altered substrate specificity.

Srienc, Friedrich (Lake Elmo, MN); Jackson, John K. (Plymouth, MN); Somers, David A. (Roseville, MN)

2000-01-01T23:59:59.000Z

85

Data:C54356c1-f056-48cb-a2c1-2c6dbe5b9ba5 | Open Energy Information  

Open Energy Info (EERE)

4356c1-f056-48cb-a2c1-2c6dbe5b9ba5 4356c1-f056-48cb-a2c1-2c6dbe5b9ba5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sacramento Municipal Utility District Effective date: 2013/01/01 End date if known: 2013/12/31 Rate name: PEV Sector: Residential Description: For customers who own a passenger electric vehicles and or passenger battery electric vehicles & take service under option 1 TOU rate will be eligible for RTT credit Source or reference: https://www.smud.org/en/residential/customer-service/rate-information/rates-rules-regulations.htm Source Parent: Comments Applicability Demand (kW)

86

Search for the Z_1(4050)^+ and Z_2(4250)^+ States in bar B^0 to chi_{c1} K^- pi^+ and B^+ to chi_{c1} K^0_S pi^+  

SciTech Connect

We search for the Z{sub 1}(4050){sup +} and Z{sub 2}(4250){sup +} states, reported by the Belle Collaboration, decaying to {chi}{sub c1}{pi}{sup +} in the decays {bar B}{sup 0} {yields} {chi}{sub c1}K{sup -}{pi}{sup +} and B{sup +} {yields} {chi}{sub c1}K{sub S}{sup 0}{pi}{sup +} where {chi}{sub c1} {yields} J/{psi}{gamma}. The data were collected with the BABAR detector at the SLAC PEP-II asymmetric-energy e{sup +}e{sup -} collider operating at center-of-mass energy 10.58 GeV, and correspond to an integrated luminosity of 429 fb{sup -1}. In this analysis, we model the background-subtracted, efficiency-corrected {chi}{sub c1}{pi}{sup +} mass distribution using the K{pi} mass distribution and the corresponding normalized K{pi} Legendre polynomial moments, and then test the need for the inclusion of resonant structures in the description of the {chi}{sub c1}{pi}{sup +} mass distribution. No evidence is found for the Z{sub 1}(4050){sup +} and Z{sub 2}(4250){sup +} resonances, and 90% confidence level upper limits on the branching fractions are reported for the corresponding B-meson decay modes.

Lees, J.P.; Poireau, V.; Tisserand, V.; /Annecy, LAPP; Garra Tico, J.; Grauges, E.; /Barcelona U., ECM; Martinelli, M.; /INFN, Bari /Bari U.; Milanes, D.A.; /INFN, Bari; Palano, A.; Pappagallo, M.; /INFN, Bari /Bari U.; Eigen, G.; Stugu, B.; /Bergen U.; Brown, D.N.; Kerth, L.T.; Kolomensky, Yu.G.; Lynch, G.; /UC, Berkeley; Koch, H.; Schroeder, T.; /Ruhr U., Bochum; Asgeirsson, D.J.; Hearty, C.; Mattison, T.S.; McKenna, J.A.; /British Columbia U. /Brunel U. /Novosibirsk, IYF /UC, Irvine /UC, Riverside /UC, Santa Barbara /UC, Santa Cruz /Caltech /Cincinnati U. /Colorado U. /Colorado State U. /Dortmund U. /Dresden, Tech. U. /Ecole Polytechnique /Edinburgh U. /INFN, Ferrara /Ferrara U. /INFN, Ferrara /Ferrara U. /INFN, Ferrara /Frascati /INFN, Genoa /Genoa U. /INFN, Genoa /INFN, Genoa /Genoa U. /INFN, Genoa /Indian Inst. Tech., Guwahati /Harvard U. /Harvey Mudd Coll. /Heidelberg U. /Humboldt U., Berlin /Imperial Coll., London /Iowa State U. /Iowa State U. /Johns Hopkins U. /Paris U., VI-VII /LLNL, Livermore /Liverpool U. /Queen Mary, U. of London /Royal Holloway, U. of London /Royal Holloway, U. of London /Louisville U. /Mainz U., Inst. Kernphys. /Manchester U. /Maryland U. /Massachusetts U., Amherst /MIT /McGill U. /INFN, Milan /Milan U. /Mississippi U. /Montreal U. /INFN, Naples /Naples U. /NIKHEF, Amsterdam /NIKHEF, Amsterdam /Notre Dame U. /Ohio State U. /Oregon U. /INFN, Padua /Padua U. /INFN, Padua /INFN, Padua /Padua U. /Paris U., VI-VII /INFN, Perugia /Perugia U. /INFN, Pisa /Pisa U. /INFN, Pisa /Pisa, Scuola Normale Superiore /INFN, Pisa /Pisa U. /INFN, Pisa /INFN, Pisa /Pisa U. /INFN, Pisa /Princeton U. /INFN, Rome /INFN, Rome /Rome U. /INFN, Rome /INFN, Rome /Rome U. /INFN, Rome /Rostock U. /Rutherford /DAPNIA, Saclay /SLAC /South Carolina U. /Southern Methodist U. /Stanford U., Phys. Dept. /SUNY, Albany /Tel Aviv U. /Tennessee U. /Texas Nuclear Corp., Austin /Texas U., Dallas /INFN, Turin /Turin U. /INFN, Trieste /Trieste U. /Valencia U. /Victoria U. /Warwick U. /Wisconsin U., Madison

2012-04-10T23:59:59.000Z

87

j:C14 13-9-2002 p:1 c:1 blacktext Behavioral responses UVR avoidance  

E-Print Network (OSTI)

37 38 39 40 41 42 43 44 45 46 455 #12;j:C14 13-9-2002 p:2 c:1 black­text MMMM #12;j:C14 13-9-2002 p:3

Johnsen, Sönke

88

$C^{1,\\alpha}$-Regularity of energy minimizing maps from a 2-dimentional domain into a Finsler space  

E-Print Network (OSTI)

We show $C^{1,\\alpha}$-regularity for energy minimizing maps from a 2-dimensional Riemannian manifold into a Finsler space $(\\R^n, F)$ with a Finsler structure $F(u,X)$.

Tachikawa, Atsushi

2011-01-01T23:59:59.000Z

89

Optical Spectral Observations of a Flickering White-Light Kernel in a C1 Solar Flare  

E-Print Network (OSTI)

We analyze optical spectra of a two-ribbon, long duration C1.1 flare that occurred on 18 Aug 2011 within AR 11271 (SOL2011-08-18T15:15). The impulsive phase of the flare was observed with a comprehensive set of space-borne and ground-based instruments, which provide a range of unique diagnostics of the lower flaring atmosphere. Here we report the detection of enhanced continuum emission, observed in low-resolution spectra from 3600 \\AA\\ to 4550 \\AA\\ acquired with the Horizontal Spectrograph at the Dunn Solar Telescope. A small, $\\le$0''.5 ($10^{15}$ cm$^2$) penumbral/umbral kernel brightens repeatedly in the optical continuum and chromospheric emission lines, similar to the temporal characteristics of the hard X-ray variation as detected by the Gamma-ray Burst Monitor (GBM) on the Fermi spacecraft. Radiative-hydrodynamic flare models that employ a nonthermal electron beam energy flux high enough to produce the optical contrast in our flare spectra would predict a large Balmer jump in emission, indicative of h...

Kowalski, Adam F; Fletcher, Lyndsay

2014-01-01T23:59:59.000Z

90

The determination of neutron energy spectrum in reactor core C1 of reactor VR-1 Sparrow  

SciTech Connect

This contribution overviews neutron spectrum measurement, which was done on training reactor VR-1 Sparrow with a new nuclear fuel. Former nuclear fuel IRT-3M was changed for current nuclear fuel IRT-4M with lower enrichment of 235U (enrichment was reduced from former 36% to 20%) in terms of Reduced Enrichment for Research and Test Reactors (RERTR) Program. Neutron spectrum measurement was obtained by irradiation of activation foils at the end of pipe of rabit system and consecutive deconvolution of obtained saturated activities. Deconvolution was performed by computer iterative code SAND-II with 620 groups' structure. All gamma measurements were performed on Canberra HPGe. Activation foils were chosen according physical and nuclear parameters from the set of certificated foils. The Resulting differential flux at the end of pipe of rabit system agreed well with typical spectrum of light water reactor. Measurement of neutron spectrum has brought better knowledge about new reactor core C1 and improved methodology of activation measurement. (author)

Vins, M. [Department of Nuclear Reactors, Faculty of Nuclear Sciences and Physical Engineering, Czech Technical University, V Holesovickach 2, 180 00 Prague 8 (Czech Republic)], E-mail: vinsmiro@seznam.cz

2008-07-15T23:59:59.000Z

91

Determining the Intrinsic Properties of the C1B Domain that Influence PKC Ligand Specificity and Sensitivity to Reactive Oxygen Species  

E-Print Network (OSTI)

reactive, an alternative conformation of C1B in which this residue is more exposed, and modification of C1B leads to unfolding and zinc loss. Because the regulatory domains are responsible for auto-inhibition of the kinase domain, C1B unfolding provides a...

Stewart, Mikaela D.

2013-06-04T23:59:59.000Z

92

Nonmetal ordering in TiC1-xNx: Ground-state structure and the effects of finite temperature Brian Kolb and Gus L. W. Hart  

E-Print Network (OSTI)

Nonmetal ordering in TiC1-xNx: Ground-state structure and the effects of finite temperature Brian 2004; revised manuscript received 11 February 2005; published 19 December 2005 The TiC1-xNx system has. Previous studies have not produced comprehensive results describing the ordering tendencies of TiC1-x

Hart, Gus

93

GRR/Elements/18-CA-c.1 to 18-CA-c.3 - Does the Project Discharge Waste to  

Open Energy Info (EERE)

GRR/Elements/18-CA-c.1 to 18-CA-c.3 - Does the Project Discharge Waste to GRR/Elements/18-CA-c.1 to 18-CA-c.3 - Does the Project Discharge Waste to Land in a Diffused Manner or Affect Groundwater Quality < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 18-CA-c.1 to 18-CA-c.3 - Does the Project Discharge Waste to Land in a Diffused Manner or Affect Groundwater Quality If waste is discharged to land in a diffused manner, such as that it causes soil erosion or the discharge affects groundwater, the developer must file a Report of Waste Discharge application (Form 200) and the necessary supplemental information with the appropriate Regional Water Quality Control Board (RWQCB) at least 120 days before beginning to discharge waste. Logic Chain No Parents

94

Enhancing mobile browsing and reading  

E-Print Network (OSTI)

Although the web browser has become a standard interface for information access on the Web, the mobile web browser on the smartphone does not hold the same interest to mobile users. A survey with 11 mobile users shows that ...

Yu, Chen-Hsiang

95

Browse the archive Show summaries  

E-Print Network (OSTI)

that a "fast ignition" laser facility could make a significant contribution to fusion research, as well, the lasers that compress the fuel capsule also heat it. Fast ignition, which was first proposed by Max Tabak, fast ignition requires less laser energy than the conventional approach, which means

96

The M3D-C1 Approach to Simulating 3D 2-fluid Magnetohydrodynamics in Magnetic Fusion Experiments  

SciTech Connect

A new approach for solving the 3D MHD equations in a strongly magnetized toroidal plasma is presented which uses high-order 2D finite elements with C1 continuity. The vector fields use a physics-based decomposition. An efficient implicit time advance separates the velocity and field advance. ITAPS (SCOREC) adaptivity software and TOPS solvers are used.

S. C. Jardin, N. Ferraro, X. Luo, J. Chen, J. Breslau, K.E. Jansen, and M. S. Shephard

2008-06-24T23:59:59.000Z

97

J. PHYS IV FRANCE 7 (1997) Colloque C1, Supplkmentau Journal de Physique I11 de mars 1997  

E-Print Network (OSTI)

solar furnace [I]. A charge of 5g of (Ni,Mn) ferrite powder mixed with 7.5g of A1203 grains was loadedinJ. PHYS IV FRANCE 7 (1997) Colloque C1, Supplkmentau Journal de Physique I11 de mars 1997 Solar was reversible and could be carried out repeatedly. 1. INTRODUCTION Solar thermal production of hydrogen

Paris-Sud XI, Université de

98

J. PHYS IV FRANCE 7 (1997) Colioque C1, Suppl6mentau Journal de Physique111de mars 1997  

E-Print Network (OSTI)

furnace. Samples were directly exposed for short time intervals to a solar flux irradiation of 300 WIcm furnace and in a high-flux solar furnace. This note summarizesthe main results obtained. 2. EXPERIMENTALJ. PHYS IV FRANCE 7 (1997) Colioque C1, Suppl6mentau Journal de Physique111de mars 1997 The Solar

Paris-Sud XI, Université de

99

Data:28138b07-7e36-4967-937c-1ca8837633d0 | Open Energy Information  

Open Energy Info (EERE)

7e36-4967-937c-1ca8837633d0 7e36-4967-937c-1ca8837633d0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ozarks Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: LTG-HPS 400 - 400 Watt HPS - Cobra - shielded Sector: Lighting Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

100

Data:65d01197-dcce-46c1-a09d-66bb308340d4 | Open Energy Information  

Open Energy Info (EERE)

7-dcce-46c1-a09d-66bb308340d4 7-dcce-46c1-a09d-66bb308340d4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tell City, Indiana (Utility Company) Effective date: 2008/07/01 End date if known: Rate name: Security Light Service: Metal Halide, 250 Watts, Flood Sector: Lighting Description: The Fixed monthly charge entered here is the sum of the "Facilities" charge ($7.25) and the "Usage" charge ($1.79). Add $3.24 for wood pole charge, if applicable. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW):

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Data:07020013-5c1e-45c0-b217-a742ac20ebfb | Open Energy Information  

Open Energy Info (EERE)

0013-5c1e-45c0-b217-a742ac20ebfb 0013-5c1e-45c0-b217-a742ac20ebfb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Grantville, Georgia (Utility Company) Effective date: End date if known: Rate name: Security/ Street-Monthly 175 W MV Sector: Lighting Description: Source or reference: Rate Binder#2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

102

Data:0d9e6488-a303-49c1-bbdd-813d50130693 | Open Energy Information  

Open Energy Info (EERE)

a303-49c1-bbdd-813d50130693 a303-49c1-bbdd-813d50130693 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Slinger Utilities Effective date: 2007/01/05 End date if known: Rate name: General Service- Three-Phase Sector: Commercial Description: This rate will be applied to three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 50 kilowatts for three or more months in a consecutive 12-month period. This rate is subject to the following Adjustments and Riders:

103

Data:99065aca-515b-4375-b2f6-c1a9dddd46bf | Open Energy Information  

Open Energy Info (EERE)

aca-515b-4375-b2f6-c1a9dddd46bf aca-515b-4375-b2f6-c1a9dddd46bf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Street Lighting 175 W MV Opt. 1 L-1 Sector: Lighting Description: Option 1 refers to a Customer owned and installed fixture. The fixed monthly charge covers energy, operation and fixture maintenance fees. Possible Additional Fees include: Transfer of a street light, mast arm, overhead conductor, and conductor support to a new pole, and make necessary electrical connection: $175 each.

104

Data:8faffe47-de64-4400-83fe-445a479c1e99 | Open Energy Information  

Open Energy Info (EERE)

faffe47-de64-4400-83fe-445a479c1e99 faffe47-de64-4400-83fe-445a479c1e99 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stanhope, Iowa (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Residential rate-all electric-rate #10 (Single Phase) Tiered Sector: Commercial Description: Source or reference: See IRPS Binder "A" Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

105

Data:4c99020a-0655-4729-bad2-d3164c1df476 | Open Energy Information  

Open Energy Info (EERE)

020a-0655-4729-bad2-d3164c1df476 020a-0655-4729-bad2-d3164c1df476 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Eastern Illinois Elec Coop Effective date: 2010/04/27 End date if known: Rate name: SINGLE-PHASE - SMALL USE RATE SCHEDULE NO. 18 Sector: Commercial Description: Available upon application to all member/owners who agree to allow the Cooperative to interrupt all electric service for the period of time specified for all uses, including lighting, heating, and power, subject to established rules and regulations of the Cooperative. Service under this schedule to permanent installations requiring more than 75 kVA of transformer capacity or

106

Data:E30994ae-83c1-4dec-8150-376135517396 | Open Energy Information  

Open Energy Info (EERE)

994ae-83c1-4dec-8150-376135517396 994ae-83c1-4dec-8150-376135517396 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: Industrial (demand charge)- outside corporate limits Sector: Industrial Description: tiered demand charge Standby power installation per kilovolt-ampere per month of installed capacity. This charge shall replace any minimum charge in a designated rate schedule Within Corporate Limits is 0.30 ,outside corporate limits is 0.035 Source or reference: http://www.amlegal.com/nxt/gateway.dll/Ohio/painesville_oh/codifiedordinancesofthecityofpainesville?f=templates$fn=default.htm$3.0$vid=amlegal:painesville_oh

107

Data:095d0503-bd3d-47dc-bdff-84405c34c1dd | Open Energy Information  

Open Energy Info (EERE)

503-bd3d-47dc-bdff-84405c34c1dd 503-bd3d-47dc-bdff-84405c34c1dd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Miami-Cass County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Security Lights 400 watt high pressure sodium(Non-metered) Sector: Lighting Description: The Miami-Cass County Rural Electric Membership Corporation (REMC) shall charge and collect for security lighting service on the following bases of availability, character of service, monthly rate, and tax adjustment. AVAILABILITY: Available to any member of the REMC for continuous year round service for outdoor lighting where 120 volt service exists ahead of the meter loop.

108

Data:16569441-c535-4b64-a4e3-5878298055c1 | Open Energy Information  

Open Energy Info (EERE)

c535-4b64-a4e3-5878298055c1 c535-4b64-a4e3-5878298055c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Douglas, Georgia (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Large Power Sector: Industrial Description: Current kW & prior 11 months' kW greater than or equal to 500 kW. Source or reference: Rate Binder Kelly 2 ISU Documentation Source Parent: Comments Minimum monthly bill: $100 + ($8.00 * Billing kW) + ECCR + PCA Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

109

Data:914302f4-aed2-4295-bd1c-1dcbca359766 | Open Energy Information  

Open Energy Info (EERE)

02f4-aed2-4295-bd1c-1dcbca359766 02f4-aed2-4295-bd1c-1dcbca359766 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Albemarle Electric Member Corp Effective date: 2012/06/01 End date if known: Rate name: Outdoor Security Lighting - 250 watt HPS - Pendant Sector: Lighting Description: * Single-phase, 60-cycle alternating current, providing service to automatically controlled dusk-to-dawn lighting, using either the Cooperative's standard fixtures on a new or existing pole or one of the Cooperative's standard ornamental lighting packages. Source or reference: http://www.albemarle-emc.com/Documents/rateschedule.pdf

110

Data:7dee4882-df20-4710-a6c1-b318748d059b | Open Energy Information  

Open Energy Info (EERE)

dee4882-df20-4710-a6c1-b318748d059b dee4882-df20-4710-a6c1-b318748d059b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delta Electric Power Assn Effective date: 2008/07/01 End date if known: Rate name: 14 Employee Service Sector: Residential Description: Available to employees of Delta Electric Power Association who have been employed for two years, for residential use in one location occupied by the employee. Single phase, 60 cycles, at standard secondary voltages and three phase, 60 cycles, at standard secondary voltages where Association has three phase facilities available. Source or reference: Rate Binder Kelly 11 ISU Documentation

111

CP and CPT violating parameters determined from the joint decays of C=+1 entangled neutral pseudoscalar mesons  

Science Journals Connector (OSTI)

Entangled pseudoscalar neutral meson pairs have been used in studying CP violation and searching for CPT violation, but almost all the previous works concern the C=?1 entangled state. Here we consider the C=+1 entangled state of pseudoscalar neutral mesons, which is quite different from the C=?1 entangled state and provides complementary information on symmetry violating parameters. After developing a general formalism, we consider three kinds of decay processes, namely, semileptonic-semileptonic, hadronic-hadronic, and semileptonic-hadronic processes. For each kind of processes, we calculate the integrated rates of joint decays with a fixed time interval, as well as asymmetries defined for these joint rates of different channels. In turn, these asymmetries can be used to determine the four real numbers of the two indirect symmetry violating parameters, based on a general relation between the symmetry violating parameters and the decay asymmetries presented here. Various discussions are provided on indirect and direct violations and the violation of the ?F=?Q rule, with some results presented as theorems.

Zhijie Huang and Yu Shi

2014-01-24T23:59:59.000Z

112

Inhibition of Ebola Virus Infection: Identification of Niemann-Pick C1 as the Target by Optimization of a Chemical Probe  

Science Journals Connector (OSTI)

Inhibition of Ebola Virus Infection: Identification of Niemann-Pick C1 as the Target by Optimization of a Chemical Probe ... A high-throughput screen identified adamantane dipeptide 1 as an inhibitor of Ebola virus (EboV) infection. ... Ebola virus; small molecule inhibitor; viral entry; photoaffinity label; target identification; Niemann-Pick C1 ...

Kyungae Lee; Tao Ren; Marceline Ct; Berahman Gholamreza; John Misasi; Anna Bruchez; James Cunningham

2012-12-15T23:59:59.000Z

113

Lunar X-ray fluorescence observations by the Chandrayaan-1 X-ray Spectrometer (C1XS): Results from the nearside southern highlands  

E-Print Network (OSTI)

Lunar X-ray fluorescence observations by the Chandrayaan-1 X-ray Spectrometer (C1XS): Results from Spectroscopy a b s t r a c t The Chandrayaan-1 X-ray Spectrometer (C1XS) flown on-board the first Indian lunar mission Chan- drayaan-1, measured X-ray fluorescence spectra during several episodes of solar flares

Wieczorek, Mark

114

Abstract LB-196: Sequencing symptom control: Results from the Alliance N08C1 and N08CA genetics of chemotherapy neuropathy trials.  

Science Journals Connector (OSTI)

...Abstract LB-196: Sequencing symptom control: Results from the Alliance N08C1 and N08CA genetics of chemotherapy neuropathy trials...Loprinzi. Sequencing symptom control: Results from the Alliance N08C1 and N08CA genetics of chemotherapy neuropathy trials...

Andreas S. Beutler; Amit Kulkarni; Rahul Kanwar; Rui Qin; Julie M. Cunningham; Terry M. Therneau; Charles L. Loprinzi

2013-04-15T23:59:59.000Z

115

Characterization of the C1 and C2 waste tanks located in the BVEST system at ORNL  

SciTech Connect

There was a major effort to sample and analyze the Active Liquid Low-Level Waste (LLLW) tanks at ORNL which include the Melton Valley Storage Tanks (MVST) and the Bethel Valley Evaporator Service Tanks (BVEST). The characterization data summarized in this report was needed to address waste processing options, address concerns dealing with the performance assessment (PA) data for the Waste Isolation Pilot Plant (WIPP), evaluate the waste characteristics with respect to the waste acceptance criteria (WAC) for WIPP and Nevada Test Site (NTS), address criticality concerns, and meet DOT requirements for transporting the waste. This report discusses the analytical characterization data for the supernatant and sludge in the BVEST waste tanks C-1 and C-2. The isotopic data presented in this report supports the position that fissile isotopes of uranium ({sup 233}U and {sup 235}U) and plutonium ({sup 239}Pu and {sup 241}Pu) were denatured as required by the administrative controls stated in the ORNL LLLW waste acceptance criteria (WAC). In general, the sludge in tanks C1 and C2 was found to be hazardous based on RCRA characteristics and the transuranic alpha activity was well above the 100 nCi/g limit for TRU waste. Additional characteristics of the C1 and C2 sludge inventory relative to the WIPP WAC limits for fissile gram equivalent, plutonium equivalent activity, and thermal power from decay heat were estimated from the data in this report and found to be far below the upper boundary for any of the remote-handled transuranic waste (RH-TRU) requirements for disposal of the waste in WIPP.

Keller, J.M.; Giaquinto, J.M.

1998-02-01T23:59:59.000Z

116

Unified and Isomer-Specific NMR Metabolomics Database for the Accurate Analysis of 13C1H HSQC Spectra  

Science Journals Connector (OSTI)

Publication Date (Web): October 21, 2014 ... The new database, termed Complex Mixture Analysis by NMR (COLMAR) 13C1H HSQC database, can be queried via an interactive, easy to use web interface at http://spin.ccic.ohio-state.edu/index.php/hsqc/index. ... The performance of our new database and query web server compares favorably with the one of existing web servers, especially for spectra of samples of high complexity, including metabolite mixtures from the model organisms Drosophila melanogaster and Escherichia coli. ...

Kerem Bingol; Da-Wei Li; Lei Bruschweiler-Li; Oscar A. Cabrera; Timothy Megraw; Fengli Zhang; Rafael Brschweiler

2014-10-21T23:59:59.000Z

117

Data:110713c3-5877-40c1-8c53-099eca878442 | Open Energy Information  

Open Energy Info (EERE)

713c3-5877-40c1-8c53-099eca878442 713c3-5877-40c1-8c53-099eca878442 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeastern Rural E M C Effective date: 2004/02/27 End date if known: Rate name: Outdoor Lighting Energy: Ballasted Lamps 60W Sector: Lighting Description: I. AVAILABILITY Service is available to any developer, community association, or governmental authority where 120-volt service exists. The cost of service provides for electricity only from existing Northeastern REMC (Northeastern) facilities. Any investment occasioned by the extension of secondary lines or the installation of a transformer for the sole purpose of this service shall require a contract setting forth the charge for the additional investment.

118

Data:6661bc18-ce82-42ad-83c1-75310757e945 | Open Energy Information  

Open Energy Info (EERE)

bc18-ce82-42ad-83c1-75310757e945 bc18-ce82-42ad-83c1-75310757e945 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland Center, Wisconsin (Utility Company) Effective date: 2007/07/09 End date if known: Rate name: Gs-1 General Service Single Phase with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0582 per kilowatt-hour.

119

Data:605b35f3-580b-4327-82c1-626021364bbf | Open Energy Information  

Open Energy Info (EERE)

b35f3-580b-4327-82c1-626021364bbf b35f3-580b-4327-82c1-626021364bbf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co (South Dakota) Effective date: End date if known: Rate name: GS-TOU (General Service Time-Of-Use) Sector: Description: RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. T T APPLICATION OF SCHEDULE: This schedule is applicable to nonresidential Customers with one Meter providing electrical service. MANDATORY AND VOLUNTARY RIDERS: The amount of a bill for service will be modified by any Mandatory Rate Riders that must apply and by any Voluntary Rate Riders selected by the Customer, unless otherwise noted in this schedule. See Sections 12.00, 13.00 and 14.00 of the South Dakota electric rates for the matrices of riders.

120

Data:Bebc0cdf-adfc-42a6-beaa-16749e5624c1 | Open Energy Information  

Open Energy Info (EERE)

Bebc0cdf-adfc-42a6-beaa-16749e5624c1 Bebc0cdf-adfc-42a6-beaa-16749e5624c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Secondary Service - Greater than 10 kVa, Non-IDR Metered, less than 400 kVa (TC-MGS) Sector: Commercial Description: Delivery Service will be single-phase, 60 hertz, at a standard secondary voltage. Delivery Service will be metered using Company's standard watt-hour Meter provided for this type of Delivery Service. Any other metering option(s) will be provided at an additional charge and/or will be provided by a Meter Owner other than the Company pursuant to Applicable Legal Authorities. Where Delivery Service of the type desired is not available at the Point of Delivery, additional charges and special contract arrangements may be required prior to Delivery Service being furnished, pursuant to Section 6.1.2.2, Construction Services, in this Tariff.

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Data:05d7e169-8664-4763-b46c-69c1f3112667 | Open Energy Information  

Open Energy Info (EERE)

e169-8664-4763-b46c-69c1f3112667 e169-8664-4763-b46c-69c1f3112667 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Sheboygan Falls, Wisconsin (Utility Company) Effective date: 2009/01/01 End date if known: Rate name: Cp-2 Service Sector: Commercial Description: Energy Charge: $0.0666 per kWh On Peak Energy Charge: $0.0510 per kWh Off Peak Distribution Demand Charge: $1.00 per kW Demand Charge: $6.00 per kW Total Demand Charges: $7.00 per kW PCAC: Power Cost Adjustment Clause will apply to all metered rates. Source or reference: http://www.cityofsheboyganfalls.com/utilities.php Source Parent:

122

Data:91825893-ec7b-447c-85a0-57040c1bfd8d | Open Energy Information  

Open Energy Info (EERE)

3-ec7b-447c-85a0-57040c1bfd8d 3-ec7b-447c-85a0-57040c1bfd8d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Ohio (Utility Company) Effective date: End date if known: Rate name: area lighting 1000 w quartz Sector: Lighting Description: area lighting,1000w quartz maximum 348 kwh per lamp Source or reference: http://www.cpp.org/CPP%20RRR%20ORDINANCE%20as%20of%2011-14-06.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

123

Data:4ce23436-1708-4fac-8c1b-89f7650106bd | Open Energy Information  

Open Energy Info (EERE)

3436-1708-4fac-8c1b-89f7650106bd 3436-1708-4fac-8c1b-89f7650106bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Chattanooga, Tennessee (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: GSA-3 Sector: Industrial Description: Applicable to customers with a demand greater than 1000 kW. Manufacturing Credit: This credit is only for manufactures with SIC codes 20 through 39 who are above 1000 kW but less than 5000 kW metered demand. The credit is as followed: first 1000 kW- a credit of $1.38 per kW is applied Remaining kW- a credit of $1.63 per kW is applied For all energy use- a credit of $.054 per kWh is applied.

124

Data:950109f7-27af-4032-b7c1-c80a1592baff | Open Energy Information  

Open Energy Info (EERE)

9f7-27af-4032-b7c1-c80a1592baff 9f7-27af-4032-b7c1-c80a1592baff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeast Nebraska P P D Effective date: 2013/01/01 End date if known: Rate name: Rate Scheduel WPS-1 - Transmission Lines Sector: Commercial Description: A. This Rate Schedule WPS -1 is available only to municipalities who purchase from the District all of its power and energy requirements (with the exception of any direct Western allocation) for resale, including sales to end-use customers and load growth. B. This Rate Schedule WPS-1 is made available in conjunction with rate schedules that are a part of a Wholesale Power Agreement between the District and Nebraska Electric Generation and Transmission Cooperative, Inc. ("NEG&T"). In the event there is any inconsistency between the provisions of this Rate Schedule WPS -1 and those rate schedules which are a part of the District/NEG&T Wholesale Power Contract, then the provisions of the District/NEG&T Power Contract rate schedules shall govern

125

Data:67639909-6467-41c1-a2fc-8dba36d02da5 | Open Energy Information  

Open Energy Info (EERE)

6467-41c1-a2fc-8dba36d02da5 6467-41c1-a2fc-8dba36d02da5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Street Lighting 400 W HPS Opt. 2 L-1 Sector: Lighting Description: Option 2 is a Utility (SUB) owned and installed fixtures. in addition to charges in Option 2, there is a charge of .333% per month for return on investment (plant original cost). Source or reference: http://www.subutil.com/files/static_page_files/A6CFDCA3-94A4-7DCF-40A67DECC1D04974/201204SUBElec.pdf Source Parent:

126

Data:01daceb9-3406-4631-b63c-1e9187bd7edd | Open Energy Information  

Open Energy Info (EERE)

daceb9-3406-4631-b63c-1e9187bd7edd daceb9-3406-4631-b63c-1e9187bd7edd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Indiana REMC Effective date: 2010/09/01 End date if known: Rate name: Commercial and Industrial Service Rate - CI - SEA (optional rate) Sector: Industrial Description: Availability Available as an optional rate to any consumer of the Corporation for multi-phase electric service and single-phase retail, commercial, and industrial electric service at a single delivery point with a transformer capacity greater than 50 KVA and a maximum of 300 KVA. A consumer choosing this optional rate must remain on the rate for a minimum of six months. Consumers opting to change to a different rate schedule after the six month minimum period must wait a minimum of six months before returning to this optional rate.

127

Data:26c85471-f18c-403a-95ca-5e2f8f2270c1 | Open Energy Information  

Open Energy Info (EERE)

ca-5e2f8f2270c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information...

128

Data:23acfee1-c1d7-4253-8591-15d0446c7290 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:23acfee1-c1d7-4253-8591-15d0446c7290 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York Power Authority Effective date: 2013/07/01 End date if known: Rate name: SC 69 Conventional Sector: Commercial Description: New York City Customers Source or reference: http://www.nypa.gov/about/documents.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

129

Cross section and asymmetry parameter calculations for the C 1s photoionization of CH4, CF4, and CCl4  

Science Journals Connector (OSTI)

We have computed cross sections and asymmetry parameters for the C 1s photoionization of CX4 (X=H, F, Cl) using the Schwinger variational method with Pad corrections. We present a comparative study that shows the influence of the identity of the X atom on the computed cross sections. Predicted cross sections are in good agreement with available photoionization and photoabsorption experimental data. We conclude that the presence of heavy outer atoms produces resonance structures in the photoionization cross sections and in the asymmetry parameters. We find a single nonvalence resonant state in the photoionization of CF4 and multiple resonances in CCl4 that have significant d-orbital character in the vicinity of the Cl atoms.

Alexandra P. P. Natalense; Luiz M. Brescansin; Robert R. Lucchese

2003-09-04T23:59:59.000Z

130

Electronic structure of Pt based topological Heusler compounds with C1{sub b} structure and 'zero band gap'  

SciTech Connect

Besides of their well-known wide range of properties it was recently shown that many of the heavy Heusler semiconductors with 1:1:1 composition and C1{sub b} structure exhibit a zero band gap behavior and are topological insulators induced by their inverted band structure. In the present study, the electronic structure of the Heusler compounds PtYSb and PtLaBi was investigated by bulk sensitive hard x-ray photoelectron spectroscopy. The measured valence band spectra are clearly resolved and in well agreement to the first-principles calculations of the electronic structure of the compounds. The experimental results give clear evidence for the zero band gap state.

Ouardi, Siham; Shekhar, Chandra; Fecher, Gerhard H.; Kozina, Xeniya; Stryganyuk, Gregory; Felser, Claudia [Institut fuer Anorganische Chemie und Analytische Chemie, Johannes Gutenberg-Universitaet, D-55099 Mainz (Germany); Ueda, Shigenori; Kobayashi, Keisuke [NIMS Beamline Station at SPring-8, National Institute for Materials Science, Hyogo 679-5148 (Japan)

2011-05-23T23:59:59.000Z

131

c1.xls  

Gasoline and Diesel Fuel Update (EIA)

Number of Number of Buildings (thousand) Floorspace (million square feet) Sum of Major Fuels Electricity Natural Gas Fuel Oil District Heat All Buildings* .................................. 4,645 64,783 92,577 69,032 14,525 1,776 7,245 Building Floorspace (Square Feet) 1,001 to 5,000 ................................... 2,552 6,789 12,812 10,348 2,155 292 Q 5,001 to 10,000 ................................. 889 6,585 9,398 7,296 1,689 307 Q 10,001 to 25,000 ............................... 738 11,535 13,140 10,001 2,524 232 Q 25,001 to 50,000 ............................... 241 8,668 10,392 7,871 1,865 127 Q 50,001 to 100,000 ............................. 129 9,057 11,897 8,717 1,868 203 Q 100,001 to 200,000 ........................... 65 9,064 13,391 9,500 1,737 272 Q 200,001 to 500,000 ........................... 25 7,176 10,347

132

Appendix C-1  

NLE Websites -- All DOE Office Websites (Extended Search)

Development, or Demonstration) The Subcontractor is hereby placed on notice that the contracting party to this subcontract is the Alliance for Sustainable Energy, LLC, in its...

133

c1.xls  

Gasoline and Diesel Fuel Update (EIA)

Q N Food Service ... 297 1,654 6,865 5,176 1,615 Q Q Health Care ... 129 3,163 7,440 4,882 1,538 79 Q...

134

Data:C1e42c1b-d8a0-48f7-a717-a7a42f801e92 | Open Energy Information  

Open Energy Info (EERE)

e42c1b-d8a0-48f7-a717-a7a42f801e92 e42c1b-d8a0-48f7-a717-a7a42f801e92 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: 2012/05/20 End date if known: Rate name: Commercial- Distribution Delivery - Three Phase ST Off-Peak Sector: Commercial Description: Additional Meters (Off-Peak Included) $ 3.60/Meter/Mo. Applies to all customers who historically meet the following criteria: 1. average greater than 50 KW monthly demand per year, or 2. have a monthly demand greater than 100 KW two or more times per year, or 3. require service to an irrigation site. Load Management Options - Two options are available to C/I customers who wish to lower their coincidental demand charges by participating in the Load Management Program. 1. Full load management - Under full load management, the customer is expected to curtail load during all hours of load management. Under this option, the customer can avoid all seasonal coincidental demand charges. 2. Incremental pricing - Customers also have the option of purchasing energy during certain control periods. Nodak will provide a signal at the load management receiver indicating whether or not incremental energy is available. The customer is responsible to monitor the load management system status. If the customer chooses to operate through periods when incremental energy is available, coincidental demand charges will not accrue; however, an incremental adder will be charged for each kilowatt-hour consumed during those hours. These charges are as follows: Irrigation incremental adder up to *$0.12/Kwh All other C/I accounts incremental adder up to *$0.095/Kwh

135

Data:25a199cd-0e65-4533-9fce-90817c1f1124 | Open Energy Information  

Open Energy Info (EERE)

Data Data Edit with form History Facebook icon Twitter icon » Data:25a199cd-0e65-4533-9fce-90817c1f1124 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Arkansas Inc (Arkansas) Effective date: 2010/06/30 End date if known: Rate name: 2 REMT residential management time-of-use (three-phase) Sector: Residential Description: For residential service to single family residences or individual family apartments supplied through one meter, including incidental family use, on the appurtenant premises. This rate is not applicable to commercial type use on the premises is used for nonresidential purposes, the predominant use of the service, as determined by the company, shall determine the predominant use of the service. Service is for the use of the customer and may not be shared and may not be resold to others. Not applicable to standby or supplementary service. Customers currently taking service under the company's optional residential time-of--use rate may terminate that service and begin service under this schedule provided they have completed twelve continuous months of service under schedule RT.

136

An application of Ti-K X-ray absorption edges and fine structures to the study of substoichiometric titanium carbide TiC1-x  

E-Print Network (OSTI)

of substoichiometric titanium carbide TiC1-x V. Moisy-Maurice and C. H. de Novion C.E.A./IRDI/DMECN/DTech, Laboratoire des échantillons de TiC1-x, (0,5 ~ 1 - x ~ 0,97). Quand la teneur x en lacunes de carbone augmente, (i 4p du titane (situé à 10-15 eV au-dessus du niveau de Fermi EF dans TiC0,97) se déplace

Paris-Sud XI, Université de

137

ARM - Datastreams - twrcam3m  

NLE Websites -- All DOE Office Websites (Extended Search)

Datastreamstwrcam3m Datastreamstwrcam3m Documentation Data Quality Plots Citation DOI: 10.5439/1025311 [ What is this? ] Generate Citation ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Datastream : TWRCAM3M Three Meter Tower: video camera Active Dates 2002.03.25 - 2013.07.09 Measurement Categories Surface Properties Originating Instrument Tower Camera (TWRCAM) Measurements The measurements below provided by this product are those considered scientifically relevant. Measurement Variable Surface condition jpg Locations North Slope Alaska NSA C2 Browse Data Central Facility, Atqasuk AK ARM Mobile Facility FKB M1 Browse Data Black Forest, Germany GRW M1 Browse Data Graciosa Island, Azores, Portugal NIM M1 Browse Data Niamey, Niger

138

Metal-ion Complexation Effects in C 1s-NEXAFS Spectra of Carboxylic AcidsEvidence by Quantum Chemical Calculations  

SciTech Connect

Previous systematic C 1s-NEXAFS studies carried out for humic acid (HA) loaded with polyvalent metal cations (Mn+) reveal spectral features which were postulated to result from metal ion complexation: a strong decrease of the C 1s (COO-) ? p*Cdouble bond; length as m-dashO transition intensity and the appearance of a new absorption feature at slightly lower energy adjacent to the carboxyl resonance. Although spectroscopic results for the Mn+-PAA (polyacrylic acid) system (selected as model for structurally ill-defined HA) reveal the same spectral features, evidence by an independent approach for interpretation of these features is desirable. It is well established that quantum chemical calculations are capable of reproducing transition features in C 1s core excitation spectra of small organic molecules, e.g., acetate, which is chosen here as a fragment containing the complexing group to model the macromolecular HA and PAA systems. In this study, the RI-ADC(2) approach, as implemented in the TURBOMOLE program package, is applied to calculate vertical core excitation spectra of various metal acetates and the acetate anion. An energy shift (?f) between the C 1s (COO-) ? p*Cdouble bond; length as m-dashO transition of the acetate anion and various metal cation acetates is established. Calculated shifts are very similar to the experimentally observed values for the energy difference between the C 1s (COO-) ? p*Cdouble bond; length as m-dashO peak and the absorption feature appearing after metal ion complexation in Mn+-PAA/PAA. According to our computations, structural changes of the acetate complexes (e.g., the O-CeO bond angle) compared to the free acetate anion are predominantly responsible for the spectral changes observed upon metal ion complexation.

Armbruster, M.; Schimmelpfennig, B; Plaschke, M; Rothe, J; Denecke, M; Klenze, R

2009-01-01T23:59:59.000Z

139

Data:607c6c18-c80e-40bd-9f2e-c1b9c3352df8 | Open Energy Information  

Open Energy Info (EERE)

c6c18-c80e-40bd-9f2e-c1b9c3352df8 c6c18-c80e-40bd-9f2e-c1b9c3352df8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Newton, North Carolina (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Industrial Service Sector: Industrial Description: Available only to establishments classified as "Manufacturing Industries" by the Standard Industrial Classification Manual published by the United States Government, and where more than 50% of the electric energy consumption of such establishment is used for its manufacturing processes. Source or reference: http://www.newtonnc.gov/departments/finance/docs/Approved_Fees___Charges_FY_2014.pdf

140

Data:2752013a-2c1d-4a7b-83c7-4a43879eac5e | Open Energy Information  

Open Energy Info (EERE)

2013a-2c1d-4a7b-83c7-4a43879eac5e 2013a-2c1d-4a7b-83c7-4a43879eac5e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nebraska Public Power District Effective date: 2013/01/01 End date if known: Rate name: 400 W Mercury Vapor- Nonwood Sector: Lighting Description: 139 To all night street lighting service (dusk to daylight) from the overhead systems conforming to the District's standard specifications. Nonwood; Enclosed Electricity is provided through the Village, which obtains electric power from Nebraska Public Power District (NPPD) Source or reference: http://www.nppd.com/assets/municipalstreetlightingservice.pdf

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Data:3c80092c-1e91-4a91-ad94-d979af50246b | Open Energy Information  

Open Energy Info (EERE)

092c-1e91-4a91-ad94-d979af50246b 092c-1e91-4a91-ad94-d979af50246b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Street Lighting 250 W HPS Opt. 1 L-1 Sector: Lighting Description: Option 1 refers to a Customer owned and installed fixture. The fixed monthly charge covers energy, operation and fixture maintenance fees. Possible Additional Fees include: Transfer of a street light, mast arm, overhead conductor, and conductor support to a new pole, and make necessary electrical connection: $175 each.

142

Data:8ff86cd9-405e-488b-97c1-963f04232fe3 | Open Energy Information  

Open Energy Info (EERE)

ff86cd9-405e-488b-97c1-963f04232fe3 ff86cd9-405e-488b-97c1-963f04232fe3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Springville, New York (Utility Company) Effective date: 2010/11/01 End date if known: Rate name: Security Lighting (400 Watt Mercury Vapor Horizontal Burning Luminare mounted on 30 bracket) Sector: Commercial Description: Source or reference: Rate Binder #5B (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

143

Data:E310c1ca-83f8-4156-ba68-f1ede3864937 | Open Energy Information  

Open Energy Info (EERE)

10c1ca-83f8-4156-ba68-f1ede3864937 10c1ca-83f8-4156-ba68-f1ede3864937 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mitchell Electric Member Corp Effective date: 2009/01/01 End date if known: Rate name: SCHEDULE SL-14 SECURITY LIGHTING SERVICE L2 100 WATT WOOD POLE Sector: Lighting Description: AVAILABILITY * Available in all territory served by the Cooperative and subject to the Cooperative's Service Rules and Regulations. SCHEDULE SL-14 SECURITY LIGHTING SERVICE L2 100 WATT WOOD POLE APPLICABILITY * Applicable only to outdoor lighting by ballast-operated vapor lamp fixtures and poles conforming to the Cooperative's specifications. Service will be rendered only at locations accessible for maintenance.

144

Data:3b516d93-c642-4e73-a23c-1a406d60ec34 | Open Energy Information  

Open Energy Info (EERE)

c642-4e73-a23c-1a406d60ec34 c642-4e73-a23c-1a406d60ec34 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of West Point, Mississippi (Utility Company) Effective date: 2012/11/01 End date if known: Rate name: General Power Service - GSA Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

145

Data:85438d14-0c9c-40c1-b4fb-548da4ab2df9 | Open Energy Information  

Open Energy Info (EERE)

c9c-40c1-b4fb-548da4ab2df9 c9c-40c1-b4fb-548da4ab2df9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: A & N Electric Coop Effective date: 2008/01/02 End date if known: Rate name: Former Delmarva Power Territory: Public Lighting Service-Outdoor Lighting-High Pressure Sodium-Customer Owned w/ Maintenance-70 W Sector: Lighting Description: Estimated Monthly Average Usage: 36kWh Additional Monthly Charges: Ornamental or Decorative Luminaires, $2.12 Poles Wood 25ft - 40 ft, $4.23 Fiberglass or Aluminum, Embedded, less than 25 ft, $4.23 Fiberglass or Aluminum, Embedded,25 ft- 35 ft, $8.47

146

Data:77827cc8-51e2-4106-acff-c1da0d1e7ef5 | Open Energy Information  

Open Energy Info (EERE)

7cc8-51e2-4106-acff-c1da0d1e7ef5 7cc8-51e2-4106-acff-c1da0d1e7ef5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delaware Electric Cooperative Effective date: 2011/02/01 End date if known: Rate name: Lighting Service--Schedule L-1 HP Sodium Vapor Lamp-Road Luminaire (250w) Sector: Lighting Description: Available to Members, governments, agencies, public and private organizations desiring Electric Delivery or Electric Supply and Delivery Services through unmetered services for roadway and area lighting. Source or reference: http://www.delaware.coop/my-services/residential/billing/rates

147

Data:A68b3383-58c2-46c1-b326-2e87ab126132 | Open Energy Information  

Open Energy Info (EERE)

b3383-58c2-46c1-b326-2e87ab126132 b3383-58c2-46c1-b326-2e87ab126132 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Norris Public Power District Effective date: 2012/01/20 End date if known: Rate name: SCHEDULE 20 - POLE ATTACHMENT Sector: Commercial Description: To other utilities and certain entities which may occupy public right-of-way and who attach communication cable and other communication appliances on District owned poles where such attachments are made in accordance with National Electrical Safety Code (NESC), and local laws; and are in compliance with the provisions of an applicable Pole Attachment Contract, if any.

148

Data:Ec9e6a69-824c-438a-a3c1-629292832b19 | Open Energy Information  

Open Energy Info (EERE)

9-824c-438a-a3c1-629292832b19 9-824c-438a-a3c1-629292832b19 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Rural Elec Coop Inc Effective date: 2011/02/01 End date if known: Rate name: Residential 4C Sector: Residential Description: Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

149

Data:3f07f427-c1f5-4423-890e-d71bf7c22d67 | Open Energy Information  

Open Energy Info (EERE)

f427-c1f5-4423-890e-d71bf7c22d67 f427-c1f5-4423-890e-d71bf7c22d67 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Escanaba, Michigan (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Electric Heat City Industrial Sector: Industrial Description: To all customers for such service when separately metered upon application and approval of permanently installed equipment; subject to such rules and regulations as are established by the utility. When air conditioning is installed in an electrically heated area, it may be connected to the same meter for space conditioning purposes.

150

Data:Ec5914f7-12af-47cc-8af8-b4c1efdbbaf5 | Open Energy Information  

Open Energy Info (EERE)

914f7-12af-47cc-8af8-b4c1efdbbaf5 914f7-12af-47cc-8af8-b4c1efdbbaf5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lower Yellowstone R E A, Inc Effective date: 2010/09/14 End date if known: Rate name: Schedule YL - 175 Watt Mercury Vapor light Sector: Lighting Description: Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

151

Data:B9b4e9c1-326d-42d7-9391-6745f0122efe | Open Energy Information  

Open Energy Info (EERE)

b4e9c1-326d-42d7-9391-6745f0122efe b4e9c1-326d-42d7-9391-6745f0122efe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sacramento Municipal Utility District Effective date: 2013/01/01 End date if known: 2013/12/31 Rate name: RWGH - Three Phase Sector: Residential Description: Source or reference: https://www.smud.org/en/residential/customer-service/rate-information/rates-rules-regulations.htm Source Parent: Comments Flat Rate Adjustment = Solar Surcharge Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

152

Data:91e7f86b-414b-491c-b9c1-726eb4f95aa5 | Open Energy Information  

Open Energy Info (EERE)

f86b-414b-491c-b9c1-726eb4f95aa5 f86b-414b-491c-b9c1-726eb4f95aa5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nebraska Public Power District Effective date: 2013/01/01 End date if known: Rate name: 150 W LED- Wood Sector: Commercial Description: To all night street lighting service (dusk to daylight) from the overhead systems conforming to the District's standard specifications. Wood; Enclosed Electricity is provided through the Village, which obtains electric power from Nebraska Public Power District (NPPD) Source or reference: http://www.nppd.com/assets/municipalstreetlightingservice.pdf

153

Data:035076d8-1c5e-47c1-abd9-4a927a13d51a | Open Energy Information  

Open Energy Info (EERE)

1c5e-47c1-abd9-4a927a13d51a 1c5e-47c1-abd9-4a927a13d51a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Frankfort, Kentucky (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Rate 2/19- Local Government and School Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

154

Data:750c6f09-fe02-4979-b5c1-46053156c3cf | Open Energy Information  

Open Energy Info (EERE)

c6f09-fe02-4979-b5c1-46053156c3cf c6f09-fe02-4979-b5c1-46053156c3cf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Roosevelt County Elec Coop Inc Effective date: 2013/02/21 End date if known: Rate name: Irrigation Pumping and Dryer Service(Interruptible rate) Sector: Residential Description: Available to irrigation consumers and/or peanut or grain dryers, three phase, who are not on demand instrumentation. Source or reference: http://www.rcec.coopwebbuilder.com/content/consumer-rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

155

Data:F3a2943a-b790-4afd-ae9a-80477bcfb7c1 | Open Energy Information  

Open Energy Info (EERE)

43a-b790-4afd-ae9a-80477bcfb7c1 43a-b790-4afd-ae9a-80477bcfb7c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2011/01/01 End date if known: Rate name: RATE NO. 11 STREET LIGHTING-Pedestrian Light 16000HPS Sector: Lighting Description: Applicability: To all customers for the purpose of outdoor lighting of streets alleys, thoroughfares, public parks and playgrounds. Service is dusk to dawn and District will own, operate and maintain the street lighting system including lamps and glass replacement. Monthly Usage: 150kWh Source or reference: http://www.ed3online.org/view/70

156

Data:Ed370a32-1ac8-4379-9651-fc42c1bf16ef | Open Energy Information  

Open Energy Info (EERE)

a32-1ac8-4379-9651-fc42c1bf16ef a32-1ac8-4379-9651-fc42c1bf16ef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Membership Corporation Effective date: 2009/07/01 End date if known: Rate name: OUTDOOR LIGHTING SERVICE Sodium Vapor, Open w/ pole 100 W Sector: Lighting Description: 9,500 Lumens, 100 W Availability - Available to individual consumers, in all territory served by the Cooperative, for purposes of lighting private outdoor areas or residential subdivision streets from dusk to dawn. Service under this schedule is subject to the Cooperative's established Service Rules and Regulations.

157

Data:A6a56848-f3a9-4690-bdb0-c1cf23310c21 | Open Energy Information  

Open Energy Info (EERE)

6848-f3a9-4690-bdb0-c1cf23310c21 6848-f3a9-4690-bdb0-c1cf23310c21 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tell City, Indiana (Utility Company) Effective date: 2011/03/01 End date if known: Rate name: Street Lighting, LED Retrofit: LED, Type 40 Sector: Lighting Description: The Fixed monthly charge entered here is the sum of the "Facilities" charge ($3.45) and the "Usage" charge ($1.83). When applicable: add $3.24 to the "Facilities" charge for Wood Pole, add $6.74 to the "Facilities" charge for Metal Round Pole Aluminum, add $11.33 to the "Facilities" charge for Metal Round Steel Decorative

158

Data:E3019026-c3d7-425a-92fe-c1b3fa1bef4b | Open Energy Information  

Open Energy Info (EERE)

c3d7-425a-92fe-c1b3fa1bef4b c3d7-425a-92fe-c1b3fa1bef4b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Platte-Clay Electric Coop, Inc Effective date: 2013/01/01 End date if known: Rate name: SL - 400 watt HPS/MV Parking Lot Light (Shoebox) Sector: Lighting Description: Available for lighting streets, walkways, or outdoor lighting of public or private areas when such facilities are operated and maintained as an extension of the Cooperative's distribution system. Electric usage will be unmetered. Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments Applicability

159

Data:4946d009-a1c8-4dad-b8c1-54781a580ced | Open Energy Information  

Open Energy Info (EERE)

09-a1c8-4dad-b8c1-54781a580ced 09-a1c8-4dad-b8c1-54781a580ced No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stafford, Kansas (Utility Company) Effective date: End date if known: Rate name: E7 - 192 Horsepower Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/627/rate%20information%20for%20Stafford.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

160

Data:6618eb9a-44ef-4c1e-9dae-d6f2ccf3dde3 | Open Energy Information  

Open Energy Info (EERE)

eb9a-44ef-4c1e-9dae-d6f2ccf3dde3 eb9a-44ef-4c1e-9dae-d6f2ccf3dde3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Highline Electric Assn Effective date: 2013/01/01 End date if known: 2013/12/31 Rate name: Small Commercial Rates (Three Phase) Sector: Commercial Description: Applicable commercial consumers, small industrial consumers and three-phase farm consumers for all usage, subject to the conditions of service and the established rules and regulations of the Association. Service under this schedule is limited to consumers whose load requirement is less than 50 kva of transformer capacity.

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Data:Cae03864-ad1f-42dc-af6f-528d06e61c1c | Open Energy Information  

Open Energy Info (EERE)

Cae03864-ad1f-42dc-af6f-528d06e61c1c Cae03864-ad1f-42dc-af6f-528d06e61c1c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Alabama Power Co Effective date: 2009/01/01 End date if known: Rate name: 100 W METAL HALIDE DECORATIVE Sector: Lighting Description: Source or reference: http://www.alabamapower.com/pricing/pdf/FPL.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

162

Data:09a44f08-d414-45c1-ab03-11027fe175a6 | Open Energy Information  

Open Energy Info (EERE)

4f08-d414-45c1-ab03-11027fe175a6 4f08-d414-45c1-ab03-11027fe175a6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric Coop, Inc Effective date: 2012/03/19 End date if known: Rate name: Street Lighting - Blinking light. Sector: Lighting Description: Source or reference: http://www.lincolnelectric.coop/PDF/schedule-istreetlightingservice.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

163

Data:129794cc-cc55-4c1d-9d5e-ead906d44ac2 | Open Energy Information  

Open Energy Info (EERE)

cc-cc55-4c1d-9d5e-ead906d44ac2 cc-cc55-4c1d-9d5e-ead906d44ac2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oklahoma Electric Coop Inc Effective date: 2012/01/01 End date if known: Rate name: Large Power Primary Service Sector: Industrial Description: To members located on or near Cooperative's distribution lines for all types of usage, subject to the established Terms and Conditions of the Cooperative. This schedule is not applicable to breakdown, standby, supplementary or resale service. Source or reference: http://www.okcoop.org/services/rates.aspx Source Parent: Comments Applicability

164

Data:Fc10f2fe-6c8e-4581-bf1c-1c5167a29c76 | Open Energy Information  

Open Energy Info (EERE)

fe-6c8e-4581-bf1c-1c5167a29c76 fe-6c8e-4581-bf1c-1c5167a29c76 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kings Mountain, North Carolina (Utility Company) Effective date: 2011/07/31 End date if known: Rate name: Outdoor Lighting Service- 175W Mercury Vapor- Suburban, New Pole w/UG Sector: Lighting Description: Available to individual customer at locations on the City's distribution system. Source or reference: http://www.cityofkm.com/Downloads/billing/Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

165

Data:Db125fa9-b984-4c4b-b9c1-fceb94916518 | Open Energy Information  

Open Energy Info (EERE)

fa9-b984-4c4b-b9c1-fceb94916518 fa9-b984-4c4b-b9c1-fceb94916518 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Chambersburg, Pennsylvania (Utility Company) Effective date: 2004/05/03 End date if known: Rate name: Primary Power Off-Peak Demand Rate Sector: Commercial Description: The rate applies to users of the primary power rate, however the billing demand shall be no less than 100 kW. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

166

Data:28ec72db-d1db-4daf-94c1-6c055c6fc28b | Open Energy Information  

Open Energy Info (EERE)

db-d1db-4daf-94c1-6c055c6fc28b db-d1db-4daf-94c1-6c055c6fc28b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pataula Electric Member Corp Effective date: 1997/12/01 End date if known: Rate name: Schedule SS - Seasonal Service, Single Phase Sector: Commercial Description: Applicable to seasonal loads with connected motor capacity exceeding 10 horsepower.A seasonal consumer is defined as a permanently connected consumer with a recurring seasonal pattern of service requirements. Source or reference: http://facts.psc.state.ga.us/Public/GetDocument.aspx?ID=128532 Source Parent: Comments Applicability

167

Data:30b779d1-876a-436b-a568-b94ab5e8c1b0 | Open Energy Information  

Open Energy Info (EERE)

876a-436b-a568-b94ab5e8c1b0 876a-436b-a568-b94ab5e8c1b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of North Little Rock, Arkansas (Utility Company) Effective date: 2012/09/01 End date if known: Rate name: RS Sector: Residential Description: Source or reference: http://nlrelectric.com/residential/rates/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

168

Data:50c16450-21c4-4ea2-9476-4c96774559c1 | Open Energy Information  

Open Energy Info (EERE)

-21c4-4ea2-9476-4c96774559c1 -21c4-4ea2-9476-4c96774559c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: COMMERCIAL SERVICE - SCHEDULE C Sector: Commercial Description: Applicable to customers whose demands are less than 25 kW for electric power service supplied at secondary distribution voltage. Not applicable to standby or resale service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

169

Data:9c3b6c8f-eb33-4041-8553-7c25c1eb7373 | Open Energy Information  

Open Energy Info (EERE)

eb33-4041-8553-7c25c1eb7373 eb33-4041-8553-7c25c1eb7373 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wisconsin Rapids W W & L Comm Effective date: 2009/01/01 End date if known: Rate name: Street Lighting HPS 400w Overhead Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting. The Purchase Cost Adjustment Clause, a charge per all kWh that varies monthly, applies to this rate. Source or reference: http://www.wrwwlc.com/StreetYard.aspx Source Parent: Comments Applicability Demand (kW)

170

Data:7c3e49fb-1a30-40e9-aa09-2d8622c1a68a | Open Energy Information  

Open Energy Info (EERE)

e49fb-1a30-40e9-aa09-2d8622c1a68a e49fb-1a30-40e9-aa09-2d8622c1a68a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Altamaha Electric Member Corp Effective date: 2011/05/01 End date if known: Rate name: Outdoor Security Lighting Service- SL-9 (250W HPS-Open/Closed) - Existing Pole Sector: Lighting Description: Applicable to consumers for dusk to dawn outdoor lighting in close proximity to existing overhead distribution lines. Service will be rendered only at locations that, in the opinion of the Cooperative, are readily accessible for maintenance. Source or reference: ISU Documentation

171

Data:615cd71b-3165-4c1f-920a-e98f026b1b66 | Open Energy Information  

Open Energy Info (EERE)

b-3165-4c1f-920a-e98f026b1b66 b-3165-4c1f-920a-e98f026b1b66 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pioneer Electric Coop, Inc Effective date: 2012/03/27 End date if known: Rate name: SCHEDULE A-2-12 ALL ELECTRIC SERVICE Three Phase-City Sector: Commercial Description: This tariff is available for all electrical usage by residential customers who use electricity exclusively and where the majority of usage is residential in nature. Service is subject to the established rules and regulations of the Cooperative. Energy sales under this schedule are subject to the Energy Cost Adjustment

172

Data:267776e3-1e8f-4fa8-ab42-9c1d5e304a97 | Open Energy Information  

Open Energy Info (EERE)

e8f-4fa8-ab42-9c1d5e304a97 e8f-4fa8-ab42-9c1d5e304a97 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clinton County Elec Coop, Inc Effective date: 2013/02/01 End date if known: Rate name: Schedule 05 - 9,500 Lumens 100 Watt high pressure sodium lamp metered Sector: Lighting Description: Available to metered and unmetered street lighting, security lighting and traffic lighting. Source or reference: www.cceci.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

173

Data:499e824e-7f63-4baa-96c1-6b8411553a06 | Open Energy Information  

Open Energy Info (EERE)

e-7f63-4baa-96c1-6b8411553a06 e-7f63-4baa-96c1-6b8411553a06 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2010/10/01 End date if known: Rate name: General Service, Base - Energy Only Metering - Price Schedule GBN Sector: Commercial Description: Available In the Company's Iowa electric service area (North System only). Source or reference: http://www.midamericanenergy.com/include/pdf/rates/elecrates/iaelectric/ia-elec.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

174

Data:5f44458d-515a-40c1-a9de-65fae2952ac4 | Open Energy Information  

Open Energy Info (EERE)

d-515a-40c1-a9de-65fae2952ac4 d-515a-40c1-a9de-65fae2952ac4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salmon River Electric Coop Inc Effective date: 2004/02/21 End date if known: Rate name: Single Phase Master Metered (Non Demand) RV Parks (1300-1399 local access) Sector: Residential Description: Service under this schedule is available to master-metered mobile home parks and recreational vehicle (RV) parks. The type of service provided under this schedule is single phase, at the standard voltage available for the premises to be served, supplied through one meter at one point of delivery.

175

Data:D60e5fe4-2723-479d-b16b-9fabe37583c1 | Open Energy Information  

Open Energy Info (EERE)

fe4-2723-479d-b16b-9fabe37583c1 fe4-2723-479d-b16b-9fabe37583c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Austin, Minnesota (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: City Street Lighting 175 Watt High-Pressure Sodium Lamp Sector: Lighting Description: APPLICABLE: For the City of Austin municipal street lighting as determined by the City of Austin. Street Lighting unit burning time is limited to dusk to daylight (approximately 4,400 hrs. per year). CHARACTER OF SERVICE: 120/240 Volts, AC, as available. Source or reference: http://austinutilities.com/pages/aboutUs_rates.asp

176

Data:E62172b0-47c1-4022-984f-36c6f067a8c2 | Open Energy Information  

Open Energy Info (EERE)

7c1-4022-984f-36c6f067a8c2 7c1-4022-984f-36c6f067a8c2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lighthouse Electric Coop, Inc Effective date: 2010/06/01 End date if known: Rate name: Security Lighting 400W MV Sector: Lighting Description: Energy Usage 160KWH Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

177

Data:9bf6bbb2-3651-48f0-afca-2ce6974c1fa3 | Open Energy Information  

Open Energy Info (EERE)

bbb2-3651-48f0-afca-2ce6974c1fa3 bbb2-3651-48f0-afca-2ce6974c1fa3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Columbia River Peoples Ut Dist Effective date: 2011/10/01 End date if known: Rate name: Street and Highway Lighting 200w Sodium Vapor Sector: Lighting Description: Monthly Charge: Includes energy costs only, with the Customer having paid the installation costs and the periodic maintenance costs. Contract Options: For services beyond energy only, the PUD offers standard contracts for maintenance and contracts to finance Customer's street lighting installations. All applicable BPA Power Cost Adjustment charges per Rate Schedule 94 shall apply to all kWh's billed to Customers under this Rate Schedule.

178

Data:B8bd92c1-e40b-4ec9-8800-bab5b49711d0 | Open Energy Information  

Open Energy Info (EERE)

2c1-e40b-4ec9-8800-bab5b49711d0 2c1-e40b-4ec9-8800-bab5b49711d0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Bay City, Michigan (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: CUSTOMER OWNED STREET LIGHTING RATE (Mercury Vapor 175) Sector: Lighting Description: Mercury Vapor (175 watts) Source or reference: http://www.baycitymi.org/images/Department/electric/pdf/Electric%20Service%20Rate%20Schedule.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

179

Data:Bc0d1518-7eca-44f4-8a3e-1a902027c1f3 | Open Energy Information  

Open Energy Info (EERE)

d1518-7eca-44f4-8a3e-1a902027c1f3 d1518-7eca-44f4-8a3e-1a902027c1f3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tecumseh, Nebraska (Utility Company) Effective date: 2013/10/01 End date if known: Rate name: General Service Demand (October 2013) Sector: Commercial Description: Optional to all customers with demands of 25 kW or more for 3 consecutive months whose entire requirements are taken through 1 meter. Mandatory for customers with demands of 60 kW or more for two consecutive months. Not applicable to resale, stand-by, or auxiliary. Source or reference: ISU Documentation

180

Data:893cd1dd-10f9-4c69-a0c1-6369572ac325 | Open Energy Information  

Open Energy Info (EERE)

cd1dd-10f9-4c69-a0c1-6369572ac325 cd1dd-10f9-4c69-a0c1-6369572ac325 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Davenport, Nebraska (Utility Company) Effective date: 2012/11/11 End date if known: Rate name: Directional Lighting MH 250 W Unmetered Sector: Lighting Description: Area/directional lighting of farmyards, backyards, patios, parking lots, storage yards, trailer courts, industrial sites, schools churches, apartments, businesses and many other applications where lighting is needed for identification, merchandising, environment, aesthetics, safety, security, protection or convenience.

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Data:D88f59f3-6121-43e3-b6c1-10f29ac3e213 | Open Energy Information  

Open Energy Info (EERE)

f3-6121-43e3-b6c1-10f29ac3e213 f3-6121-43e3-b6c1-10f29ac3e213 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Carolina Pub Serv Auth Effective date: 2012/10/01 End date if known: Rate name: Outdoor Lighting - Shoebox 150 Watt PMH Sector: Residential Description: Source or reference: https://www.santeecooper.com/business/equipment-leases/outdoor-lighting.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

182

Data:A4562795-5d79-4705-94dc-5c1999c1bfa5 | Open Energy Information  

Open Energy Info (EERE)

5-5d79-4705-94dc-5c1999c1bfa5 5-5d79-4705-94dc-5c1999c1bfa5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Indiana Inc Effective date: 2009/09/14 End date if known: Rate name: Metered Signal Service - Primary Sector: Commercial Description: Availability For service to a traffic or flasher signal system belonging to any municipality, the State of Indiana, or any other agency legally authorized to own, operate and maintain a traffic or flasher signal system in conjunction with the regulation of traffic at "controlled intersections" of public streets or highways.

183

Data:Afb7001a-6030-4833-82d0-65aac7c1ab07 | Open Energy Information  

Open Energy Info (EERE)

Afb7001a-6030-4833-82d0-65aac7c1ab07 Afb7001a-6030-4833-82d0-65aac7c1ab07 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salt River Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Large Power - 500 kW - 3000 kW Secondary Voltage Sector: Industrial Description: Source or reference: www.srelectric.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

184

Data:2794db62-46e3-4c1f-9aae-b3f8afae9f38 | Open Energy Information  

Open Energy Info (EERE)

db62-46e3-4c1f-9aae-b3f8afae9f38 db62-46e3-4c1f-9aae-b3f8afae9f38 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Albemarle Electric Member Corp Effective date: 2012/06/01 End date if known: Rate name: Outdoor Security Lighting - 1000 watt MH - Flood Sector: Lighting Description: * Single-phase, 60-cycle alternating current, providing service to automatically controlled dusk-to-dawn lighting, using either the Cooperative's standard fixtures on a new or existing pole or one of the Cooperative's standard ornamental lighting packages. Source or reference: http://www.albemarle-emc.com/Documents/rateschedule.pdf

185

Data:B6995793-7bbe-4717-8b8a-7fe99c1fe735 | Open Energy Information  

Open Energy Info (EERE)

3-7bbe-4717-8b8a-7fe99c1fe735 3-7bbe-4717-8b8a-7fe99c1fe735 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Arrowhead Electric Coop, Inc Effective date: 2012/07/17 End date if known: Rate name: Interruptable Heat/Water Sector: Description: This rate is applicable for customers who have General Service. Usage under this rate would be tracked by a 2nd meter. Source or reference: Illinois State University Archives Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

186

Data:5fcf2739-c1ad-464f-a3de-d8716dd1e774 | Open Energy Information  

Open Energy Info (EERE)

fcf2739-c1ad-464f-a3de-d8716dd1e774 fcf2739-c1ad-464f-a3de-d8716dd1e774 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Monthly Farm and Commercial Three-Phase power Service with heat Sector: Commercial Description: Source or reference: Ilinois State University Rate binder # 10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

187

Data:2dd33cd4-f79d-40c1-a48a-0516be8f37cd | Open Energy Information  

Open Energy Info (EERE)

cd4-f79d-40c1-a48a-0516be8f37cd cd4-f79d-40c1-a48a-0516be8f37cd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Loup River Public Power Dist Effective date: 2013/01/15 End date if known: Rate name: District Owned Lighting EWN 50000 Sector: Commercial Description: Source or reference: http://www.loup.com/customersvc/rates.asp Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

188

Data:7cd4f450-7f5f-43c1-a71c-260a5567a5d6 | Open Energy Information  

Open Energy Info (EERE)

f450-7f5f-43c1-a71c-260a5567a5d6 f450-7f5f-43c1-a71c-260a5567a5d6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Woodruff Electric Coop Corp Effective date: 2012/10/24 End date if known: Rate name: Outdoor lighting - Security Lamps 400 W MVL Sector: Lighting Description: To unmetered automatically controlled outdoor lighting service burning all night. Source or reference: Illinois State University Archive Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

189

Data:E71f062c-84d0-4559-a1b2-87c1a080fa47 | Open Energy Information  

Open Energy Info (EERE)

2c-84d0-4559-a1b2-87c1a080fa47 2c-84d0-4559-a1b2-87c1a080fa47 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jacksonville Electric Authority Effective date: 2012/01/01 End date if known: Rate name: SL73 Standard HPS 70 watts Sector: Lighting Description: To any Public Agency (State, County, or Municipal governments) and to Owner's Associations for automatically controlled lighting of public thoroughfares and to JEA's private residential customers who are owners of the property in question for automatically controlled area lighting. Source or reference: https://www.jea.com/About_Us/Tariffs_and_Reports/Tariffs_and_Reports.aspx

190

Data:Bb03ebf5-822e-4d9e-a54a-c1b3483938ec | Open Energy Information  

Open Energy Info (EERE)

3ebf5-822e-4d9e-a54a-c1b3483938ec 3ebf5-822e-4d9e-a54a-c1b3483938ec No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Halstad, Minnesota (Utility Company) Effective date: 2013/01/20 End date if known: Rate name: Power(HLC) Sector: Commercial Description: Nursing Home Source or reference: Rate Binder #10A, Illinois State University. Source Parent: Comments Flat rate buy= energy charge + Power surcharge Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

191

Data:28261509-fdd1-490c-9179-08e7cad9c1d7 | Open Energy Information  

Open Energy Info (EERE)

-fdd1-490c-9179-08e7cad9c1d7 -fdd1-490c-9179-08e7cad9c1d7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Small Industrial- Time-of-Use Sector: Industrial Description: This type of service is Time of Use Demand Rate. Medium and Small Industrial Users may elect and have Time of Use Demand metering. Any such election shall commence with June usage, be for a minimum of one year, and will automatically renew until otherwise canceled. Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf

192

Data:060c610b-c9bd-430d-9d88-792e593c1b41 | Open Energy Information  

Open Energy Info (EERE)

c610b-c9bd-430d-9d88-792e593c1b41 c610b-c9bd-430d-9d88-792e593c1b41 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Spiceland, Indiana (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: General Power Service Sector: Commercial Description: Rates are subject to an Energy Cost Adjustment Tracking Factor, determined quarterly, to reflect changes in the estimated cost of purchase power for the following calendar quarter, and to reconcile over and under collections for the cost of purchased power for the previous calender quarter. Source or reference: Rates Binder 1, Illinois State University

193

Data:3d0331c1-5fbe-46a9-bbf7-5ee1341cb968 | Open Energy Information  

Open Energy Info (EERE)

d0331c1-5fbe-46a9-bbf7-5ee1341cb968 d0331c1-5fbe-46a9-bbf7-5ee1341cb968 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Power and Light Secondary Sector: Industrial Description: This rate is available to Power and Light customers who take service from distribution secondary lines or transformers. On-Peak Season monthly usage must be greater than 8,000 kWh. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

194

Data:620f61b7-643b-40c1-aed8-b6d46364209f | Open Energy Information  

Open Energy Info (EERE)

b7-643b-40c1-aed8-b6d46364209f b7-643b-40c1-aed8-b6d46364209f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rochester Public Utilities Effective date: 2009/01/01 End date if known: Rate name: Traffic signals rate Sector: Commercial Description: AVAILABILITY: To governmental units for electric service to customer-owned traffic signal systems on public streets. MINIMUM BILL: The minimum bill is $27.12 per traffic signal control cabinet served for any month or portion of a month. Source or reference: http://www.rpu.org/documents/2012_rate_schedule.pdf Source Parent: Comments Applicability

195

Data:06d56584-edb1-414f-9e6c-1fccc2783c46 | Open Energy Information  

Open Energy Info (EERE)

-edb1-414f-9e6c-1fccc2783c46 -edb1-414f-9e6c-1fccc2783c46 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carroll Electric Member Corp Effective date: 2012/02/01 End date if known: Rate name: Outdoor Lighting Overhead Wiring Existing Wood Pole HPS 1000 W Sector: Lighting Description: *IDC Rider Charges included in Fixed Monthly Charge Source or reference: http://www.cemc.com/Files/OL-2%20Outdoor%20Lighting%20final%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

196

Data:F9d221b2-8888-4732-93c1-2b4ed4827561 | Open Energy Information  

Open Energy Info (EERE)

1b2-8888-4732-93c1-2b4ed4827561 1b2-8888-4732-93c1-2b4ed4827561 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Burke-Divide Electric Coop Inc Effective date: 2008/06/01 End date if known: Rate name: MV Mercury Vapor Yard Lighting 175 watt metered lights Sector: Lighting Description: AVAILABILITY Available to any member of the Cooperative. Subject to the rules and regulations of the Cooperative. Source or reference: http://www.bdec.coop/Service/Rates/index.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

197

Data:6b246738-37b6-4c1f-9fe1-d82167285bff | Open Energy Information  

Open Energy Info (EERE)

8-37b6-4c1f-9fe1-d82167285bff 8-37b6-4c1f-9fe1-d82167285bff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Power, Inc Effective date: 2012/10/01 End date if known: Rate name: 400 W HPS Street Lighting Sector: Lighting Description: * Applicable to service furnished from the dusk to dawn for area lighting,lighting of public streets,highways,alleys and parks. Streetlights supported on distribution type wood poles from Cooperative-owned overhead or underground system. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW)

198

Data:E7100592-8a66-4b77-9839-75446a4d22c1 | Open Energy Information  

Open Energy Info (EERE)

0592-8a66-4b77-9839-75446a4d22c1 0592-8a66-4b77-9839-75446a4d22c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carteret-Craven El Member Corp Effective date: 2013/01/01 End date if known: Rate name: Safeguard Lighting Service-Mercury Vapor 175 W Sector: Lighting Description: Basic Rates are for the Cooperative's standard lighting fixtures bracket-mounted on existing distribution system poles. Additional charges will be required for separate area lighting poles,underground service, additional facilities, or other costs incurred to provide service. Mercury Vapor Units: 7,000 lumens semi-enclosed 175 W 70kWhs

199

Data:2d616a7c-22e4-427e-91c6-c1eebd3a9a7d | Open Energy Information  

Open Energy Info (EERE)

c-22e4-427e-91c6-c1eebd3a9a7d c-22e4-427e-91c6-c1eebd3a9a7d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Heartland Rural Elec Coop, Inc Effective date: 2009/08/01 End date if known: Rate name: METERED SECURITY LIGHTING: 100 Watt High Pressure Sodium Light Sector: Lighting Description: AVAILABILITY This schedule is available for metered outdoor lighting service to any Customer. New or replacement light installations shall be limited to high pressure sodium and metal-halide lights. Source or reference: http://www.heartland-rec.com/documents/HRECTarriffsAug09web.pdf Source Parent: Comments

200

Data:49fb23e8-c1e8-4242-aea2-9fbf228fa6ae | Open Energy Information  

Open Energy Info (EERE)

c1e8-4242-aea2-9fbf228fa6ae c1e8-4242-aea2-9fbf228fa6ae No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Altamont, Kansas (Utility Company) Effective date: 2008/12/30 End date if known: Rate name: Public Building Sector: Commercial Description: Source or reference: Ted Binder 2 Source Parent: Comments Does not include the energy cost of electricity supplied to the city of altamont. Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Data:Bec72faf-e2a7-40d1-abe3-acb0f1b657c1 | Open Energy Information  

Open Energy Info (EERE)

Bec72faf-e2a7-40d1-abe3-acb0f1b657c1 Bec72faf-e2a7-40d1-abe3-acb0f1b657c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Bern, North Carolina (Utility Company) Effective date: 2009/02/01 End date if known: Rate name: Standard Residential- Three Phase Sector: Residential Description: Service under this Schedule is available for separately metered and billed supply of alternating electric current to single family residences, including a residential farm where the farm uses are not taken through a separate meter. Source or reference: http://www.ci.new-bern.nc.us/Elec/documents/residentialservicerates0107-2009.pdf

202

Data:Bd229c1e-67e3-4b51-b72b-25179dcb22ac | Open Energy Information  

Open Energy Info (EERE)

Bd229c1e-67e3-4b51-b72b-25179dcb22ac Bd229c1e-67e3-4b51-b72b-25179dcb22ac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Ocmulgee Electric Member Corp Effective date: 1999/05/01 End date if known: Rate name: 1000W Type -'MH-Flood', kWh-500 Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Corporation's specifications. Service will be rendered only at locations that, solely in the opinion of the Corporation, are readily accessible for installation and maintenance.

203

Data:7eada928-4e22-41e6-90c1-5c5078396977 | Open Energy Information  

Open Energy Info (EERE)

eada928-4e22-41e6-90c1-5c5078396977 eada928-4e22-41e6-90c1-5c5078396977 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mt Carmel Public Utility Co Effective date: End date if known: Rate name: Light - 175 watt MV Sector: Lighting Description: If the customer takes no other electric service from Company, a customer charge will be incurred as follows: $0.00 until the later of January 1, 1990 or the effective date of House Bill 362; $4.50 thereafter. Source or reference: http://www.mtcpu.com/includes/tariff_electric.htm?t=Residential_Electric_Space_Heating_Service Source Parent: Comments Applicability

204

Data:83b96f95-30cd-4770-b688-5614369c1c8d | Open Energy Information  

Open Energy Info (EERE)

b96f95-30cd-4770-b688-5614369c1c8d b96f95-30cd-4770-b688-5614369c1c8d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Paris, Tennessee (Utility Company) Effective date: 2012/10/01 End date if known: Rate name: General Power Rate- GSA Sector: Commercial Description: This rate shall apply to the firm power requirements (where a customer's contract demand is 5,000 kW of less) for electric service to commercial, industrial, and governmental customers, and to institutional customers including, without limitation, churches, clubs, fraternities, orphanages, nursing homes, rooming and boarding houses, and like customers.

205

Data:D2d9c22c-1b3a-434a-b321-75d99a350acd | Open Energy Information  

Open Energy Info (EERE)

2c-1b3a-434a-b321-75d99a350acd 2c-1b3a-434a-b321-75d99a350acd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wright-Hennepin Coop Elec Assn Effective date: 2010/08/01 End date if known: Rate name: Security and Street Lights: Parkway Decorative 250 Watt HPS Sector: Lighting Description: Source or reference: www.whe.org Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

206

Data:54da9b11-0bc3-47c1-8abf-42a910faa4bc | Open Energy Information  

Open Energy Info (EERE)

0bc3-47c1-8abf-42a910faa4bc 0bc3-47c1-8abf-42a910faa4bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Provo City Corp (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Private Outdoor Security Lighting- 65W LED Sector: Lighting Description: This schedule is available at any point on the Energy Department electric system where facilities of adequate capacity and standard lighting voltage levels are available. Source or reference: http://secure.provocitypower.com/Schedule%2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

207

Data:46353747-40c1-4262-bf7d-38f3edb14b11 | Open Energy Information  

Open Energy Info (EERE)

47-40c1-4262-bf7d-38f3edb14b11 47-40c1-4262-bf7d-38f3edb14b11 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Clay Electric Cooperative, Inc Effective date: 2011/01/01 End date if known: Rate name: Rate Schedule - GS - 1 Sector: Commercial Description: To any consumer, other than residential, with fixed wattage loads operating continuously throughout the billing period such as traffic signals. Renewable generating systems are not to be rated higher than 100 kW AC for the purpose of net metering. Source or reference: https://www.clayelectric.com/rates.aspx Source Parent: Comments Plus current month's Power Cost Adjustment and applicable taxes.

208

Data:0cb8c1de-a792-428c-b25f-7f5a5630356b | Open Energy Information  

Open Energy Info (EERE)

c1de-a792-428c-b25f-7f5a5630356b c1de-a792-428c-b25f-7f5a5630356b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Barron, Wisconsin (Utility Company) Effective date: 2009/07/15 End date if known: Rate name: Gs-1 General Service Three Phase Sector: Commercial Description: Application: This rate will be applied to single and three-phase customers. This includes commercial, institutional, government, farm, and other customers. The monthly Maximum Measured Demand of customers served on this rate shall not exceed 40 kilowatts for three or more months in a consecutive 12-month period.

209

Data:D950a1c4-4ec7-4914-bbcd-a2c1c03af787 | Open Energy Information  

Open Energy Info (EERE)

0a1c4-4ec7-4914-bbcd-a2c1c03af787 0a1c4-4ec7-4914-bbcd-a2c1c03af787 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Electric Member Corp Effective date: 2010/11/01 End date if known: Rate name: SCHEDULE I-8 - greater than 30 kVA (Single Phase - Non-Interruptible Energy Charge) Sector: Commercial Description: Applicable for electric service supplied to irrigation loads. The capacity of individual motors served under this schedule shall not exceed ten (10) horsepower without consent from the Cooperative. Source or reference: ISU Documentation Source Parent: Comments String representation "Whenever the co ... escribed below:" is too long.

210

Data:59078c68-b51d-4925-a58a-7e638c6c1b3f | Open Energy Information  

Open Energy Info (EERE)

-b51d-4925-a58a-7e638c6c1b3f -b51d-4925-a58a-7e638c6c1b3f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Electrical Dist No3 Pinal Cnty Effective date: 2012/10/24 End date if known: Rate name: RATE NO. 04 LARGE INDUSTRIAL SERVICE-UNDERGROUND Service Sector: Industrial Description: Applicability:To non-agricultural customers whose monthly maximum demand is greater than 3,000 kW for three (3) consecutive months in any continuous twelve (12) month period ending with the current month. Service is applied at one (1) point of delivery and measured through one (1) meter with an actual or estimated demand reading.

211

Data:653298f9-a5e9-45f6-b380-53b1032711c1 | Open Energy Information  

Open Energy Info (EERE)

f9-a5e9-45f6-b380-53b1032711c1 f9-a5e9-45f6-b380-53b1032711c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Davenport, Nebraska (Utility Company) Effective date: 2012/11/15 End date if known: Rate name: Highway Lighting HPS 400 Watt (Wood/Enclosed) Sector: Lighting Description: Available to public authorities, other than municipalities, for public high way and roadway lighting in the retail distribution service territory of the District. Source or reference: www.nppd.com/my-account/rates-2/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

212

Data:144bdb1f-5b57-4563-a33a-08c1b959ccd3 | Open Energy Information  

Open Energy Info (EERE)

bdb1f-5b57-4563-a33a-08c1b959ccd3 bdb1f-5b57-4563-a33a-08c1b959ccd3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Heartland Rural Elec Coop, Inc Effective date: 2009/10/29 End date if known: Rate name: Parallel Generation Tariff Sector: Residential Description: This rate schedule shall be applicable to any end-user customer served by Heartland who owns and operates generation where part or all of the electrical requirements of the customer can be supplied from customer-owned generation sources and where such sources are connected for parallel operation of the customer's system with the system of Heartland.

213

Data:Ec781b6b-cd43-4028-b51d-3c1b115ed6ab | Open Energy Information  

Open Energy Info (EERE)

b6b-cd43-4028-b51d-3c1b115ed6ab b6b-cd43-4028-b51d-3c1b115ed6ab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sacramento Municipal Utility District Effective date: 2012/01/01 End date if known: Rate name: GSS_T Sector: Residential Description: Source or reference: https://www.smud.org/en/residential/customer-service/rate-information/rates-rules-regulations.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

214

Data:9e0e1325-d6ca-456f-b199-1a1783c1fce2 | Open Energy Information  

Open Energy Info (EERE)

25-d6ca-456f-b199-1a1783c1fce2 25-d6ca-456f-b199-1a1783c1fce2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rochester Public Utilities Effective date: 2009/01/01 End date if known: Rate name: SECURITY LIGHTING(100 Watt HPS) Sector: Lighting Description: At all locations whenever the service can be provided with overhead wiring on an existing RPU owned pole. Source or reference: http://www.rpu.org/documents/2012_rate_schedule.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

215

Data:Ac478c91-7c1d-4425-89bc-041200dc2a78 | Open Energy Information  

Open Energy Info (EERE)

78c91-7c1d-4425-89bc-041200dc2a78 78c91-7c1d-4425-89bc-041200dc2a78 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lexington, Tennessee (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Street Lighting Service Sector: Lighting Description: Bracket Mounted Luminaries All-night outdoor lighting service using overhead conductors and City standard equipment mounted on wood poles. Source or reference: http://www.lexingtonnc.net/modules/showdocument.aspx?documentid=453 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

216

Data:Dac2c1f5-0271-46f2-bb3c-9e80813dbec3 | Open Energy Information  

Open Energy Info (EERE)

Dac2c1f5-0271-46f2-bb3c-9e80813dbec3 Dac2c1f5-0271-46f2-bb3c-9e80813dbec3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: OL " MV 175 Watt (Open Bottom) 70 kW Sector: Lighting Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

217

Data:75908ffc-c1b8-453b-9837-eb128e440d62 | Open Energy Information  

Open Energy Info (EERE)

ffc-c1b8-453b-9837-eb128e440d62 ffc-c1b8-453b-9837-eb128e440d62 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rochester Public Utilities Effective date: 2009/01/01 End date if known: Rate name: SECURITY LIGHTING(150 Watt HPS(Nema)) Sector: Lighting Description: At all locations whenever the service can be provided with overhead wiring on an existing RPU owned pole. Source or reference: http://www.rpu.org/documents/2012_rate_schedule.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

218

Data:4ea9a256-e75c-4a2d-9108-c1cf18682044 | Open Energy Information  

Open Energy Info (EERE)

6-e75c-4a2d-9108-c1cf18682044 6-e75c-4a2d-9108-c1cf18682044 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2006/03/06 End date if known: Rate name: Private Lighting - North - 175W MV - Billed Use Sector: Lighting Description: Source or reference: www.midamericanenergy.com/include/pdf/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

219

Data:413a465e-1b15-4845-83d2-3753c1a29c01 | Open Energy Information  

Open Energy Info (EERE)

a465e-1b15-4845-83d2-3753c1a29c01 a465e-1b15-4845-83d2-3753c1a29c01 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lansing, Michigan (Utility Company) Effective date: 2011/03/01 End date if known: Rate name: CUSTOMER OWNED SYSTEMS (Incandescent Luminaire 4000 L) Sector: Commercial Description: Available to any political subdivision or agency of the State of Michigan for street lighting service for any system consisting of one or more luminaires where the BWL has an existing distribution system available. Source or reference: http://www.lansingmi.gov/Lansing/clerk/BWL_Proposed.pdf

220

Data:3d10ec32-c068-4540-89e0-3c1ade101c9a | Open Energy Information  

Open Energy Info (EERE)

ec32-c068-4540-89e0-3c1ade101c9a ec32-c068-4540-89e0-3c1ade101c9a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Small Industrial Sector: Industrial Description: Small Industrial Energy Charge is the Commercial Electric Rate with a special minimum and choice of Demand Rate. This Small Industrial Energy Charge is for typical monthly use of less than 9,000 KWH. Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW):

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Data:Ef906c1d-5458-47f9-b585-114d08305ad0 | Open Energy Information  

Open Energy Info (EERE)

c1d-5458-47f9-b585-114d08305ad0 c1d-5458-47f9-b585-114d08305ad0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Avista Corp Effective date: 2013/01/01 End date if known: Rate name: Area Lighting - MV-GSS (25ft) 20000L Sector: Lighting Description: Public Purposes Rider = base rate x %2.85. Source or reference: http://www.avistautilities.com/services/energypricing/wa/elect/Pages/default.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

222

Data:448bb0e9-244d-41ec-889c-c1f71ab76c96 | Open Energy Information  

Open Energy Info (EERE)

e9-244d-41ec-889c-c1f71ab76c96 e9-244d-41ec-889c-c1f71ab76c96 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: High West Energy, Inc (Nebraska) Effective date: End date if known: Rate name: Street Lighting-200 - 250 watt M V/ HPS Sector: Lighting Description: Source or reference: http://www.highwest-energy.com/public/index.php/custservices/content-all-comcontent-views/rates Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

223

Data:Dae38c1d-9bf6-4589-b21a-a83433abaf8a | Open Energy Information  

Open Energy Info (EERE)

Dae38c1d-9bf6-4589-b21a-a83433abaf8a Dae38c1d-9bf6-4589-b21a-a83433abaf8a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Public Pwr Dist Effective date: 2012/05/01 End date if known: Rate name: Area&Directional Lighting Service Rate N732 - In Town Sector: Lighting Description: Source or reference: Illinois State University Rate Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

224

Data:C7ee338b-7c1a-42db-aa3b-4ecede95ec6c | Open Energy Information  

Open Energy Info (EERE)

ee338b-7c1a-42db-aa3b-4ecede95ec6c ee338b-7c1a-42db-aa3b-4ecede95ec6c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Auburn Board of Public Works Effective date: 2012/01/01 End date if known: Rate name: Seasonal/Temporary Service Sector: Commercial Description: Available to seasonal users, including cabins, uninhabited farmsteads, seasonal farm use, water pumping for stock and domestic purposes, grain handling installations, billboards, advertisement signs, temporary service and at the discretion of the BPW service is measured by one meter, and not used as a permanent service. Source or reference: http://auburnbpw.com/wp-content/files/2012_Electric_Rates.pdf

225

Data:B5a349af-ccd1-4308-b8b3-613c9717c1d6 | Open Energy Information  

Open Energy Info (EERE)

9af-ccd1-4308-b8b3-613c9717c1d6 9af-ccd1-4308-b8b3-613c9717c1d6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mohave Electric Cooperative, Inc Effective date: 2012/09/01 End date if known: Rate name: Rate L Substation Rate Sector: Industrial Description: Available to commercial or industrial customers with demands exceeding 100 kW. A discount of 5% is applied to demand and energy charges for substation customers as defined as service taken directly from the low side bus of the distribution substation or where the customer requests multiple points of delivery. Source or reference: http://mohaveelectric.coopwebbuilder.com/content/rates

226

Data:114b7d7d-6824-456d-bfa4-002312694c1d | Open Energy Information  

Open Energy Info (EERE)

6824-456d-bfa4-002312694c1d 6824-456d-bfa4-002312694c1d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Energy Co Effective date: 2012/06/08 End date if known: Rate name: General Service Primary Demand Rate -GPD-Charges for Customer Voltage Level 1 (CVL 1) Sector: Industrial Description: Source or reference: http://www.consumersenergy.com/tariffs.nsf/ELECTRIC_TARIFFS/70A0AF24D82B690885257A28005E11CA/$FILE/elerates.pdf?Open Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

227

Data:D2ef18c1-d6bd-4a8f-accc-deb2cd0d7e93 | Open Energy Information  

Open Energy Info (EERE)

8c1-d6bd-4a8f-accc-deb2cd0d7e93 8c1-d6bd-4a8f-accc-deb2cd0d7e93 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Colquitt Electric Membership Corp Effective date: 1993/06/01 End date if known: Rate name: 100W Existing HPS-Open, OVERHEAD WIRING, Wood Pole Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Source or reference: ISU Documentation Source Parent: Comments Additional $1.50 will be charged for mounted on 30 foot wood pole Applicability

228

Data:00ce79c7-0cf6-4814-af4b-c890e5586c1b | Open Energy Information  

Open Energy Info (EERE)

0cf6-4814-af4b-c890e5586c1b 0cf6-4814-af4b-c890e5586c1b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Moorhead, Minnesota (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Interruptible Curtailable Load Sector: Description: Available to General Service customers with a minimum of 100 kW of interruptible electrical load. Service under these rates requires conformance with MPS' Electric Service Rules and Regulations. Customers agree to manually curtail demand to a specified maximum demand level during the utility's curtailment period. General Service rate applies with credit for interruption as follows:

229

Data:90cfc6d1-d58b-4442-a07c-1bacd85c0661 | Open Energy Information  

Open Energy Info (EERE)

0cfc6d1-d58b-4442-a07c-1bacd85c0661 0cfc6d1-d58b-4442-a07c-1bacd85c0661 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Arkansas Inc (Arkansas) Effective date: 2010/06/30 End date if known: Rate name: 2 Large power service time of use (PST) Sector: Industrial Description: To all electric service required by any customer with maximum demand of 1000 kW or greater on the premises, when supplied at one point of delivery and measured through one meter. Applicable to standby or supplementary service and to interruptible service only in conjunction with the applicable rider for such service. Not applicable to resale or shared service.

230

Data:B3277137-3d4e-4db0-8348-6d2c1af48efb | Open Energy Information  

Open Energy Info (EERE)

7-3d4e-4db0-8348-6d2c1af48efb 7-3d4e-4db0-8348-6d2c1af48efb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2000/11/01 End date if known: Rate name: AREA LIGHTING 100 watt high pressure sodium Sector: Lighting Description: Available to all customers for dusk to dawn outdoor area lighting not served under street lighting contract. Service under this schedule is also available for television amplifiers for cable systems, and other flat rate services. Special light poles $1.00 per month Source or reference: http://www.tpud.org/servicesAndBilling/rateSchedules.aspx

231

Data:47ef0a4b-1249-421a-872c-1b88da72666a | Open Energy Information  

Open Energy Info (EERE)

a4b-1249-421a-872c-1b88da72666a a4b-1249-421a-872c-1b88da72666a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Three Notch Elec Member Corp Effective date: 2012/03/01 End date if known: Rate name: 250W Underground Wiring (Non Mercury vapor fixtures) - (Type - 'HPS-Flood',FiberglassPole(3)) Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for installation and maintenance.

232

Data:A522f37d-545e-4c1f-9dd9-be6d16d71538 | Open Energy Information  

Open Energy Info (EERE)

d-545e-4c1f-9dd9-be6d16d71538 d-545e-4c1f-9dd9-be6d16d71538 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Ruston, Louisiana (Utility Company) Effective date: End date if known: Rate name: Intra-City Electric Sales Sector: Residential Description: Source or reference: Rate Binder #10A, Illinois State University. Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

233

Data:E70650df-5370-41fb-a364-699a373e3c1c | Open Energy Information  

Open Energy Info (EERE)

E70650df-5370-41fb-a364-699a373e3c1c E70650df-5370-41fb-a364-699a373e3c1c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Whitehall Electric Utility Effective date: 2010/02/15 End date if known: Rate name: Street Lighting- 250W HPS- Overhead Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish,install, and maintain street lighting units. This rate is subject to the Power Cost Adjustment Clause. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=6490 Source Parent: Comments Applicability Demand (kW)

234

Data:D7c87a1c-1dec-4391-ba32-128609a4110c | Open Energy Information  

Open Energy Info (EERE)

c87a1c-1dec-4391-ba32-128609a4110c c87a1c-1dec-4391-ba32-128609a4110c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Memphis Light, Gas & Water Effective date: 2012/09/30 End date if known: Rate name: General Power Industrial GSA Sector: Industrial Description: This rate shall apply to the firm power requirements (where a customer's contract demand is 5,000 kW or less) for electric service to commercial, industrial, and governmental customers; institutional customers including, without limitation, churches, clubs, fraternities, orphanages, nursing homes, rooming or boarding houses, and like customers. This rate shall also apply to customers to whom service is not available under any other resale rate schedule.

235

Data:3076cde7-7cd8-4c1b-b75c-79fc69bda4a9 | Open Energy Information  

Open Energy Info (EERE)

7cd8-4c1b-b75c-79fc69bda4a9 7cd8-4c1b-b75c-79fc69bda4a9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Consumers Power, Inc Effective date: 2011/10/01 End date if known: Rate name: 100 W HPS Sector: Lighting Description: * Applicable to customers who receive dusk to dawn area lighting service. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

236

Data:1a6456bf-2417-4ca0-945c-1a849d4d6dce | Open Energy Information  

Open Energy Info (EERE)

6bf-2417-4ca0-945c-1a849d4d6dce 6bf-2417-4ca0-945c-1a849d4d6dce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tonkawa, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Standard Rate Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

237

Data:Aa816ac0-2b09-498d-ae05-d7344568c1f5 | Open Energy Information  

Open Energy Info (EERE)

ac0-2b09-498d-ae05-d7344568c1f5 ac0-2b09-498d-ae05-d7344568c1f5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Choctaw Electric Coop Inc Effective date: 2008/10/21 End date if known: Rate name: Cooperative Furnished Investment 100 Watt HPS Sector: Lighting Description: * Available under written contract with municipalities or government authorities for the purpose of lighting highways, streets, and other areas Service is available subject to the Cooperative's Terms and conditions on file with the Oklahoma Corporation Commission. Subject to tax adjustment. Source or reference: Rate binder # 4

238

Data:4c2f578f-bd36-4531-982e-3997d1c1fdbd | Open Energy Information  

Open Energy Info (EERE)

f-bd36-4531-982e-3997d1c1fdbd f-bd36-4531-982e-3997d1c1fdbd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2012/08/01 End date if known: Rate name: 70 OL-8 100 HPS, Post-Top Sector: Lighting Description: Available to all Consumer's subject to Association's established rules and regulations. Association's standard outdoor lighting facilities. Service includes Association furnishing, operating, and maintaining lighting fixture, control equipment and lamp. When Association is required to alter its normal facilities to furnish a special outdoor lighting service, there will be an additional monthly charge.

239

Data:3f752c1a-df3a-475f-ba4b-c36ef79afbc6 | Open Energy Information  

Open Energy Info (EERE)

2c1a-df3a-475f-ba4b-c36ef79afbc6 2c1a-df3a-475f-ba4b-c36ef79afbc6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cornhusker Public Power Dist Effective date: 2012/01/01 End date if known: Rate name: Irrigation and Grain-Drying Service STB (98, 398) Sector: Residential Description: Source or reference: Illinois State University Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

240

Data:F5dd5c1f-c257-4569-b19d-4a6437faf496 | Open Energy Information  

Open Energy Info (EERE)

dd5c1f-c257-4569-b19d-4a6437faf496 dd5c1f-c257-4569-b19d-4a6437faf496 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Perry Municipal Airport Sector: Commercial Description: Effective with the institution of electric service at the Perry Municipal Airport. Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V):

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Data:24489aaa-98fe-490c-93a0-89c1f6c4df3b | Open Energy Information  

Open Energy Info (EERE)

aaa-98fe-490c-93a0-89c1f6c4df3b aaa-98fe-490c-93a0-89c1f6c4df3b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Salt River Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Underground mercury vapor with pole 175 Watts Sector: Description: Source or reference: www.srelectric.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2

242

Data:20842e60-5a52-4e43-af71-081dd80c1e6d | Open Energy Information  

Open Energy Info (EERE)

e60-5a52-4e43-af71-081dd80c1e6d e60-5a52-4e43-af71-081dd80c1e6d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Fairfield Electric Coop, Inc Effective date: 2008/12/01 End date if known: Rate name: Construction Service Sector: Commercial Description: * Applicable to temporary service for builders for lighting and power for a construction site using a single point of delivery. Subject to power cost adjustment and tax adjustment. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

243

Data:D76f1eb3-e7ee-4110-a076-a58b42c300c1 | Open Energy Information  

Open Energy Info (EERE)

eb3-e7ee-4110-a076-a58b42c300c1 eb3-e7ee-4110-a076-a58b42c300c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Three Notch Elec Member Corp Effective date: 2012/03/01 End date if known: Rate name: 400W Overhead Wiring (Non Mercury vapor fixtures) - (Type - 'HPS-Flood',Wood Pole (1)) Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for installation and maintenance.

244

Data:762402c1-42b4-4f81-89e4-08307c42c238 | Open Energy Information  

Open Energy Info (EERE)

c1-42b4-4f81-89e4-08307c42c238 c1-42b4-4f81-89e4-08307c42c238 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln Electric Coop, Inc Effective date: 2012/03/19 End date if known: Rate name: Area Lighting - 250 Watt HPS Sector: Lighting Description: Source or reference: http://www.lincolnelectric.coop/PDF/schedule-hsecuritylightservice.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

245

Data:08da069a-c1af-4e4f-9970-ea8510f75c48 | Open Energy Information  

Open Energy Info (EERE)

c1af-4e4f-9970-ea8510f75c48 c1af-4e4f-9970-ea8510f75c48 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2012/08/01 End date if known: Rate name: 70 OL-8 400 HPS Sector: Lighting Description: Available to all Consumer's subject to Association's established rules and regulations. Association's standard outdoor lighting facilities. Service includes Association furnishing, operating, and maintaining lighting fixture, control equipment and lamp. When Association is required to alter its normal facilities to furnish a special outdoor lighting service, there will be an additional monthly charge.

246

Data:458caf02-fe91-408b-ba54-c1cb79df5512 | Open Energy Information  

Open Energy Info (EERE)

caf02-fe91-408b-ba54-c1cb79df5512 caf02-fe91-408b-ba54-c1cb79df5512 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gothenburg, Nebraska (Utility Company) Effective date: 2010/01/01 End date if known: Rate name: Irrigation Controlled Primary Metering/Ownership Sector: Commercial Description: *Applicable to any irrigation usage served by the City of Gothenburg. Irrigation season is from April-September. Non-summer months of the irrigation season (April/May) will be billed at the commercial general service rate. Subject to production cost adjustment and power factor adjustment. 3.5% reduction in bill for primary metering and ownership/maintenance of transformation equipment.

247

Data:6d1c1e5c-8837-4f6e-bdcb-eb945f8fcb24 | Open Energy Information  

Open Energy Info (EERE)

c1e5c-8837-4f6e-bdcb-eb945f8fcb24 c1e5c-8837-4f6e-bdcb-eb945f8fcb24 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: United Electric Coop, Inc Effective date: 2009/07/01 End date if known: Rate name: Street Lighting Cobra 250 W Sector: Lighting Description: *Available to cities, villages and sub-divisions for controlled multiple street lighting systems, subject to the established rules and regulations of the Cooperative. Charge is per house. Source or reference: http://www.ueci.coop/content/rates-charges-0 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

248

Data:55ee8960-6684-4a3b-b9cf-1c1f1e3004b5 | Open Energy Information  

Open Energy Info (EERE)

6684-4a3b-b9cf-1c1f1e3004b5 6684-4a3b-b9cf-1c1f1e3004b5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2009/01/01 End date if known: Rate name: 71 OSL-4 Outdoor Sports Lighting Sector: Lighting Description: Available to outdoor "sports" lighting installations requiring single phase service subject to Association's established rules and regulations. This rate applies to electric service measured by one meter used exclusively by one Consumer in a single establishment on one premise utilizing a single delivery point, and not resold or shared with others.

249

Data:25f929c1-bdc7-4ef0-89a0-4c862bd01c03 | Open Energy Information  

Open Energy Info (EERE)

c1-bdc7-4ef0-89a0-4c862bd01c03 c1-bdc7-4ef0-89a0-4c862bd01c03 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Petoskey, Michigan (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: Public School Rate Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

250

Data:De1e65ca-680d-46c1-985d-92af0848a44a | Open Energy Information  

Open Energy Info (EERE)

ca-680d-46c1-985d-92af0848a44a ca-680d-46c1-985d-92af0848a44a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stilwell, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lights - 175 Watt (existing pole Sector: Lighting Description: Source or reference: www.cityofstilwell.com/uploads/Ordinance_297__Water__Sewer__Electric_Rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

251

Data:67ed5b50-fda5-4c1c-b622-992867417c4d | Open Energy Information  

Open Energy Info (EERE)

b50-fda5-4c1c-b622-992867417c4d b50-fda5-4c1c-b622-992867417c4d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Southeast Electric Coop, Inc Effective date: 2010/01/01 End date if known: Rate name: Security Light 400 watt Sector: Lighting Description: Source or reference: Rate Binder Kelly 11 ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

252

Data:43f96a5c-98a4-41c1-929b-18e07c10089c | Open Energy Information  

Open Energy Info (EERE)

98a4-41c1-929b-18e07c10089c 98a4-41c1-929b-18e07c10089c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Stanhope, Iowa (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Commercial rate #21 (referred to as coop elec-2) Tiered Sector: Commercial Description: minimum charge of $399.55. Source or reference: See IRPS Binder "A" Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

253

Data:4ea9b891-fb98-4604-bc44-c1d3cc3f739e | Open Energy Information  

Open Energy Info (EERE)

ea9b891-fb98-4604-bc44-c1d3cc3f739e ea9b891-fb98-4604-bc44-c1d3cc3f739e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Perry, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Large Industrial Sector: Industrial Description: Large Industrial User: over 100,000 KWH monthly Source or reference: http://www.cityofperryok.com/Files/Codes/City_Code_101211.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

254

Data:B961f44a-2869-4eee-97e6-a79ec8c1f143 | Open Energy Information  

Open Energy Info (EERE)

a-2869-4eee-97e6-a79ec8c1f143 a-2869-4eee-97e6-a79ec8c1f143 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Adams Electric Coop Effective date: 2009/01/01 End date if known: Rate name: Rate Schedule MSL (Metered Security Lighting)(Standard fixtures 100 Watt) Sector: Lighting Description: Available to all cooperative members. 100 Watt HPS. Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

255

Data:492a1fdc-3331-4128-a66e-6d166ea0e7c1 | Open Energy Information  

Open Energy Info (EERE)

fdc-3331-4128-a66e-6d166ea0e7c1 fdc-3331-4128-a66e-6d166ea0e7c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lee County Electric Coop, Inc Effective date: 2008/07/01 End date if known: Rate name: Outdoor Lighting Electric Service- Customer Owned (250W MV) Sector: Lighting Description: Applicable to customers, other than Street Light Districts, for automatically controlled dusk-to-dawn outdoor lighting where existing overhead secondary circuits are located. Source or reference: https://www.lcec.net/pdf/EntireRateTariff.pdf#page=18 Source Parent: Comments Applicability Demand (kW) Minimum (kW):

256

Data:4b429ab1-dad7-4723-a59b-64ce33284c1c | Open Energy Information  

Open Energy Info (EERE)

29ab1-dad7-4723-a59b-64ce33284c1c 29ab1-dad7-4723-a59b-64ce33284c1c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Broad River Electric Coop, Inc Effective date: End date if known: Rate name: Schedule L2, Acorn, 1 Light Per 6 Sector: Lighting Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

257

Data:84945816-e1e8-404a-a54a-4c1cfde76bc6 | Open Energy Information  

Open Energy Info (EERE)

e1e8-404a-a54a-4c1cfde76bc6 e1e8-404a-a54a-4c1cfde76bc6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cuming County Public Pwr Dist Effective date: 2011/12/14 End date if known: Rate name: Municipal Commercial Demand Rate Sector: Commercial Description: Source or reference: Illinois State University Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

258

Data:737165f2-c1fa-4499-973a-8e30bbe9f85a | Open Energy Information  

Open Energy Info (EERE)

c1fa-4499-973a-8e30bbe9f85a c1fa-4499-973a-8e30bbe9f85a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Danville, Virginia (Utility Company) Effective date: 2012/08/28 End date if known: Rate name: Outdoor Rental Lighting Service- Decorative Security Lights- (100W HPS Colonial Aluminum) Sector: Lighting Description: Available for outdoor lighting of yards, walkways and other areas. Lights to be served hereunder shall be at locations that are easily and economically accessible to Utility equipment and personnel for construction and maintenance. Source or reference: http://www.danville-va.gov/DocumentCenter/View/8181

259

Data:44e04307-dc3b-43f7-9bc0-68779c1f9615 | Open Energy Information  

Open Energy Info (EERE)

4307-dc3b-43f7-9bc0-68779c1f9615 4307-dc3b-43f7-9bc0-68779c1f9615 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nolin Rural Electric Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Street Lighting: Ornamental Service Underground 150 Watt HPS Sector: Lighting Description: Source or reference: www.nolinrecc.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

260

Data:Ad4c3c1e-a2bf-4256-b971-cbe4f117a432 | Open Energy Information  

Open Energy Info (EERE)

c1e-a2bf-4256-b971-cbe4f117a432 c1e-a2bf-4256-b971-cbe4f117a432 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pitt & Greene Elec Member Corp Effective date: 2012/10/01 End date if known: Rate name: Large Power Service Sector: Commercial Description: This schedule is applicable to all members of the cooperative, whose monthly demand has exceeded 450 KW for any month during the past 12 months,inclusing the month for which the bill is rendered. Source or reference: Rate Binder #8 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Data:749debdb-c71b-4497-9ab0-10e3c1e8ac97 | Open Energy Information  

Open Energy Info (EERE)

debdb-c71b-4497-9ab0-10e3c1e8ac97 debdb-c71b-4497-9ab0-10e3c1e8ac97 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cairo, Georgia (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Competetive Service Electric Rate CS-1 Sector: Commercial Description: This rate is applicable to all non-residential customers whose highest annual peak demand exceeds 5,000 KW and request a contract to define certain terms of electric service/ Subject to Power Cost Adjustment(PCA). The Demand charge, energy charge, excess reactive demand and minimum monthly charge are per the contract.

262

Data:C69971c1-d3ce-4180-a2f5-debcc5718f8f | Open Energy Information  

Open Energy Info (EERE)

c1-d3ce-4180-a2f5-debcc5718f8f c1-d3ce-4180-a2f5-debcc5718f8f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coast Electric Power Assn Effective date: 2011/04/01 End date if known: Rate name: Large Power (Over 2500 kW) Sector: Industrial Description: Source or reference: http://www.coastepa.com/rateslargepower.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

263

Data:07ebea2b-96a0-4c1d-ba40-44aa6205e84a | Open Energy Information  

Open Energy Info (EERE)

ebea2b-96a0-4c1d-ba40-44aa6205e84a ebea2b-96a0-4c1d-ba40-44aa6205e84a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: RS - Schedule A-1 - City of Fircrest - collectively metered apartments Sector: Residential Description: Available for domestic purposes in residences, apartments, duplex houses and multiple family dwellings. Source or reference: www.mytpu.org/customer-service/rates/power-rates/power-rates-schedules.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

264

Data:3bb7df5c-e90e-4c1f-a46e-8176de55622b | Open Energy Information  

Open Energy Info (EERE)

df5c-e90e-4c1f-a46e-8176de55622b df5c-e90e-4c1f-a46e-8176de55622b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Baltimore Gas & Electric Co Effective date: 2013/06/23 End date if known: Rate name: 12000 lumen 294 watt MV Sector: Lighting Description: Source or reference: http://www.bge.com/myaccount/billsrates/ratestariffs/electricservice/pages/electric-services-rates-and-tariffs.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

265

Data:56e2672e-c1f5-496a-a762-52c37e90dedb | Open Energy Information  

Open Energy Info (EERE)

72e-c1f5-496a-a762-52c37e90dedb 72e-c1f5-496a-a762-52c37e90dedb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Cashton, Wisconsin (Utility Company) Effective date: 2009/02/15 End date if known: Rate name: Ms-1 Street Lighting Service: 250 W HPS(Overhead) Sector: Lighting Description: Application: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting units. Power Cost Adjustment Clause: Charge per all kWh varies monthly. Source or reference: http://psc.wi.gov/apps40/tariffs/viewfile.aspx?type=electric&id=870

266

Data:F5e6151a-0cb7-4c84-aff0-b524d72c44c1 | Open Energy Information  

Open Energy Info (EERE)

151a-0cb7-4c84-aff0-b524d72c44c1 151a-0cb7-4c84-aff0-b524d72c44c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: NSTAR Electric Company Effective date: 2012/04/01 End date if known: Rate name: ACTON Basic rate G3 (SEMA) Sector: Industrial Description: Default Generation Service ("Default Service") shall be available to any Customer who, for any reason, is not receiving Generation Service from a Competitive Supplier. Service under this rate to any Customer is subject to both the Company's printed requirements and the Company's Terms and Conditions - Distribution Service, each as in effect from time to time.

267

Data:Eed4cd30-0867-4db9-bc49-0bcec5c1b12f | Open Energy Information  

Open Energy Info (EERE)

Eed4cd30-0867-4db9-bc49-0bcec5c1b12f Eed4cd30-0867-4db9-bc49-0bcec5c1b12f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mascoutah, Illinois (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Municipal Street Lighting Service- Rate 6: Mercury Vapor, 30000 Lumen, 700 watts, Class C Sector: Lighting Description: Class C: Mercury Vapor Lamps or Sodium Vapor Lamps on standard overhead concrete pole construction or on existing metal pole construction, owned and operated by utility. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments

268

Data:Fde5f466-7549-4544-b629-097b14c1d233 | Open Energy Information  

Open Energy Info (EERE)

Fde5f466-7549-4544-b629-097b14c1d233 Fde5f466-7549-4544-b629-097b14c1d233 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Wisconsin Rapids W W & L Comm Effective date: 2009/01/01 End date if known: Rate name: Street Lighting Metal Halide 250w Ornamental Sector: Lighting Description: This schedule will be applied to municipal street lighting. The utility will furnish, install, and maintain street lighting. The Purchase Cost Adjustment Clause, a charge per all kWh that varies monthly, applies to this rate. Source or reference: http://www.wrwwlc.com/StreetYard.aspx Source Parent: Comments Applicability

269

Data:338bfc96-5c1b-4023-970f-bd29a65ca755 | Open Energy Information  

Open Energy Info (EERE)

bfc96-5c1b-4023-970f-bd29a65ca755 bfc96-5c1b-4023-970f-bd29a65ca755 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Public Pwr Dist Effective date: 2012/05/01 End date if known: Rate name: Area&Directional Lighting Service Rate22 175 Watts Sector: Lighting Description: Source or reference: Illinois State University Rate Binder #10 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

270

Data:F41dac0f-5ea4-4c1f-8723-10834d4deb6b | Open Energy Information  

Open Energy Info (EERE)

dac0f-5ea4-4c1f-8723-10834d4deb6b dac0f-5ea4-4c1f-8723-10834d4deb6b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Borough of Kutztown, Pennsylvania (Utility Company) Effective date: 2012/01/01 End date if known: Rate name: INSTITIONAL SERVICE RATE 105000 Sector: Commercial Description: Source or reference: http://www.kutztownboro.org/kutztown/uploads/ElectricRatesJanuary2012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

271

Data:D1d2f727-0561-48c1-9f79-9b04027e7bdd | Open Energy Information  

Open Energy Info (EERE)

f727-0561-48c1-9f79-9b04027e7bdd f727-0561-48c1-9f79-9b04027e7bdd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Utility District No 2 Effective date: 2011/10/01 End date if known: Rate name: Residential & Farm Single Phase Sector: Residential Description: This schedule is applicable to domestic use of electric energy by all residential and farm service customers. Residential and farm service accounts are billed on a monthly cycle. Power Cost Adjustment Factor = 7% The Power Cost Adjustment is based on rate adjustments from BPA . Source or reference: http://www.pacificpud.org/rate_resfarm.html

272

Data:81c869db-d699-46e8-8c0c-2c1d03330fdd | Open Energy Information  

Open Energy Info (EERE)

db-d699-46e8-8c0c-2c1d03330fdd db-d699-46e8-8c0c-2c1d03330fdd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Carolina Pub Serv Auth Effective date: 2012/10/01 End date if known: Rate name: Outdoor Lighting - The Lexington 150 Watt PMH Sector: Residential Description: Source or reference: https://www.santeecooper.com/business/equipment-leases/outdoor-lighting.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

273

Data:1fa18f02-399d-4975-b0d8-c1c3413f5c30 | Open Energy Information  

Open Energy Info (EERE)

f02-399d-4975-b0d8-c1c3413f5c30 f02-399d-4975-b0d8-c1c3413f5c30 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Delmarva Power Effective date: 2013/06/01 End date if known: Rate name: "SGS-ND" & "MGS-S" WH (Un-Bundled) Sector: Commercial Description: Source or reference: http://www.delmarva.com/_res/documents/DEMasterTariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

274

Data:085ad3a1-99db-4087-b6c1-cf99d8a52642 | Open Energy Information  

Open Energy Info (EERE)

a1-99db-4087-b6c1-cf99d8a52642 a1-99db-4087-b6c1-cf99d8a52642 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Duncan, Oklahoma (Utility Company) Effective date: End date if known: Rate name: Security Lighting- (400W MV on existing 40 Ft. wood Pole) Sector: Lighting Description: This rate schedule is available on an annual basis to any customer for illumination of outdoor areas. Source or reference: ISU Documentation Rate Binder Ted #9 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

275

Data:8a05a59a-9c7e-46b5-87c4-42c1f62242cc | Open Energy Information  

Open Energy Info (EERE)

a59a-9c7e-46b5-87c4-42c1f62242cc a59a-9c7e-46b5-87c4-42c1f62242cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Leavenworth-Jefferson E C, Inc Effective date: 2010/05/01 End date if known: Rate name: Street Light Rate (MV 250 W) Sector: Lighting Description: Available for municipal outdoor lighting service on public thoroughfares, city housing development, and in public parks where service can be supplied from a breaker box installed by the cooperative on existing facilities of the cooperative. Street Light Rate (MV 250 W) Source or reference: Rate Binder #7 (Illinois State University)

276

Data:5f48681a-b04e-4427-846c-6d62db4927c1 | Open Energy Information  

Open Energy Info (EERE)

b04e-4427-846c-6d62db4927c1 b04e-4427-846c-6d62db4927c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: White River Electric Assn, Inc Effective date: 2013/01/01 End date if known: Rate name: Schedule LP-P- Large Power Primary Sector: Industrial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

277

Data:D170af82-adab-4006-9d9c-c1c998b51f14 | Open Energy Information  

Open Energy Info (EERE)

2-adab-4006-9d9c-c1c998b51f14 2-adab-4006-9d9c-c1c998b51f14 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oklahoma Gas & Electric Co (Arkansas) Effective date: End date if known: Rate name: Power and Light (PL-1) Sector: Description: Source or reference: Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

278

Data:6f371d4d-fcec-434b-a46b-4c1f2190757f | Open Energy Information  

Open Energy Info (EERE)

d4d-fcec-434b-a46b-4c1f2190757f d4d-fcec-434b-a46b-4c1f2190757f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Ellaville, Georgia (Utility Company) Effective date: 2011/01/01 End date if known: Rate name: Security Lighting Service 400 W MV Sector: Lighting Description: To unmetered dusk-to-down electric service used for illuminating public thoroughfares and private outdoor areas,including, but not limited to ,roadways,parking lots and yards. Source or reference: Rate Binder#2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

279

Data:62025b45-1476-40b8-9979-e21c1b18a721 | Open Energy Information  

Open Energy Info (EERE)

b45-1476-40b8-9979-e21c1b18a721 b45-1476-40b8-9979-e21c1b18a721 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Three Notch Elec Member Corp Effective date: 2012/03/01 End date if known: Rate name: 400W Underground Wiring (Non Mercury vapor fixtures) - (Type - 'MH-Flood',FiberglassPole(3)) Sector: Lighting Description: Applicable only for dusk to dawn lighting by means of photo-electric controlled, ballast operated vapor lamp luminaries and poles conforming to the Cooperative's specifications. Service will be rendered only at locations that, solely in the opinion of the Cooperative, are readily accessible for installation and maintenance.

280

Data:945019f8-4d4b-4193-ad9d-9dbd2209c1ce | Open Energy Information  

Open Energy Info (EERE)

f8-4d4b-4193-ad9d-9dbd2209c1ce f8-4d4b-4193-ad9d-9dbd2209c1ce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Gustavus Electric Inc Effective date: End date if known: Rate name: Commercial Sector: Commercial Description: Source or reference: http://www.gustavuselectric.com/images_documents/documents/tariff/Tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Data:D9ae5b79-be24-4bdb-8c03-4c7608527c1d | Open Energy Information  

Open Energy Info (EERE)

b79-be24-4bdb-8c03-4c7608527c1d b79-be24-4bdb-8c03-4c7608527c1d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Tennessee (Utility Company) Effective date: End date if known: Rate name: General Power Commercial - Code 50 Sector: Commercial Description: * Demand 51-1000 KW Source or reference: http://www.springfield-tn.org/rates_fees/index.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

282

Data:2add8eb1-dcb1-4c1f-9bca-ce3f2117c0f5 | Open Energy Information  

Open Energy Info (EERE)

add8eb1-dcb1-4c1f-9bca-ce3f2117c0f5 add8eb1-dcb1-4c1f-9bca-ce3f2117c0f5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Membership Corporation Effective date: 2009/07/01 End date if known: Rate name: SUBDIVISION STREET LIGHTING Sodium Vapor, Enclosed w/pole-4 consumers Sector: Lighting Description: 9,500 Lumens, 100 W, 1 light per 4 consumers. Availability - Available to individual consumers, in all territory served by the Cooperative, for purposes of residential subdivision street lighting from dusk to dawn. Service under this schedule is subject to the Cooperative's established Service Rules and Regulations.

283

Data:5c3a3887-d511-4c75-99c1-6fb4ad886fc5 | Open Energy Information  

Open Energy Info (EERE)

7-d511-4c75-99c1-6fb4ad886fc5 7-d511-4c75-99c1-6fb4ad886fc5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: East Mississippi Elec Pwr Assn Effective date: 2011/10/01 End date if known: Rate name: Schedule 34 - South System General Power Time-of-Use Rate Sector: Commercial Description: This rate shall apply to the firm power requirements for electric service to commercial, industrial, and governmental customers and institutional customers whose monthly read demand is greater than 1000 KW and less than or equal to 5000 KW. Source or reference: ISU Documentation Source Parent: Comments Applicability

284

Data:D7931085-e83e-4ed5-817d-31e74c7c1c06 | Open Energy Information  

Open Energy Info (EERE)

85-e83e-4ed5-817d-31e74c7c1c06 85-e83e-4ed5-817d-31e74c7c1c06 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland, Washington (Utility Company) Effective date: 2013/01/01 End date if known: Rate name: Schedule 45: Irrigation >60 Horsepower - Single Phase Sector: Commercial Description: A. Availability: In all territory served by the City's electric utility. B. Applicability: To uses of electrical power on a continuous basis for seasonal agricultural irrigation pumping or agricultural drainage pumping. C. Character of Service: Sixty-hertz (60) alternating current of such phase and voltage as the electric utility may have available.

285

Data:3f7aa9d0-c149-4f35-b1fe-21f35c1f1604 | Open Energy Information  

Open Energy Info (EERE)

aa9d0-c149-4f35-b1fe-21f35c1f1604 aa9d0-c149-4f35-b1fe-21f35c1f1604 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Anaheim, California (Utility Company) Effective date: 2012/09/12 End date if known: Rate name: Lighting- City-Owned System- 22,000 Lumen High Pressure Sodium Sector: Lighting Description: Applicable to outdoor area lighting service, other than street and highway lighting service, supplied from overhead lines where the Utility owns and maintains the area lighting equipment. Source or reference: http://www.anaheim.net/utilities/ElectricRules/SCHD-LO.pdf Source Parent:

286

C1u1 C2u2 20E 60E 100E 140E 180 140W 60W100W 20W  

E-Print Network (OSTI)

x z y x z y C1·u1 C2·u2 #12;80°N 60°N 40°N 20°N 20°S Eq 80°S 40°S 60°S 20°E 60°E 100°E 140°E 180

Fischlin, Andreas

287

Production of the charmonium states ?c1 and ?c2 in proton nucleus interactions at s=41.6??GeV  

Science Journals Connector (OSTI)

A measurement of the ratio R?c=(?c?J/?+?)/J/? in pC, pTi, and pW interactions at 920??GeV/c (s=41.6??GeV) in the Feynman-x range -0.35c1 to ?c2 production ratio R12=R?c1/R?c2 is measured to be 1.020.40, leading to a cross section ratio ?(?c1)?(?c2)=0.570.23. The dependence of R?c on the Feynman-x of the J/?, xFJ/?, and its transverse momentum, pTJ/?, is studied, as well as its dependence on the atomic number, A, of the target. For the first time, an extensive study of possible biases on R?c and R12 due to the dependence of acceptance on the polarization states of J/? and ?c is performed. By varying the polarization parameter, ?obs, of all produced J/?s by two sigma around the value measured by HERA-B, and considering the maximum variation due to the possible ?c1 and ?c2 polarizations, it is shown that R?c could change by a factor between 1.02 and 1.21 and R12 by a factor between 0.89 and 1.16.

I. Abt et al. (The HERA-B Collaboration)

2009-01-13T23:59:59.000Z

288

Browse Archived Directives - DOE Directives, Delegations, and...  

NLE Websites -- All DOE Office Websites (Extended Search)

Relationships 1300 Management Systems and Standards 1400 Administrative Support Services 1500 Travel and Transportation 1600 Equal Opportunity 1700 Freedom of Information...

289

C3Bio.org - Tags: Browse  

NLE Websites -- All DOE Office Websites (Extended Search)

Great Pyramid is found in... - Select an answer - Egypt The North Pole Canada Japan Rocks Please leave this field blank. required Problem: required Attach a screenshot: optional...

290

Computerworld Home > Browse Topics > Government > Story  

E-Print Network (OSTI)

against the Internet's underlying structure, like DNS and big core routers and the like, which is a good for Internet By BOB BREWIN OCTOBER 18, 2002 Content Type: Story Source: Computerworld Government Knowledge to develop a Global Early Warning Information System (GEWIS) to monitor the performance of the Internet

Simonson, Shai

291

A Video Browsing enabled Personal Video Recorder  

Science Journals Connector (OSTI)

We present the worlds first highlights-playback-capable hard disk drive (HDD)-enhanced DVD recorder (personal video recorder, PVR). It automatically detects highlights in sports video by detecting portions with ...

Isao Otsuka; Sam Shipman; Ajay Divakaran

2009-01-01T23:59:59.000Z

292

Audio browsing of automaton-based hypertext  

E-Print Network (OSTI)

........................................................................................16 Audio/Video Browser xtb4 .............................................................................17 V AUDIO BROWSER FOR caT............................................................................20 xTed........................................................................................................4 3 xTed Screen............................................................................................................6 4 SELECTOR Screen...

Ustun, Selen

2004-09-30T23:59:59.000Z

293

C3Bio.org - Members: Browse  

NLE Websites -- All DOE Office Websites (Extended Search)

The North Pole Japan Rocks Egypt Canada Please leave this field blank. required Problem: required Attach a screenshot: optional (.jpg, .jpeg, .jpe, .bmp, .tif, .tiff, .png, .gif)...

294

Calibrating and training of neutron based NSA techniques with less SNM standards  

SciTech Connect

Accessing special nuclear material (SNM) standards for the calibration of and training on nondestructive assay (NDA) instruments has become increasingly difficult in light of enhanced safeguards and security regulations. Limited or nonexistent access to SNM has affected neutron based NDA techniques more than gamma ray techniques because the effects of multiplication require a range of masses to accurately measure the detector response. Neutron based NDA techniques can also be greatly affected by the matrix and impurity characteristics of the item. The safeguards community has been developing techniques for calibrating instrumentation and training personnel with dwindling numbers of SNM standards. Monte Carlo methods have become increasingly important for design and calibration of instrumentation. Monte Carlo techniques have the ability to accurately predict the detector response for passive techniques. The Monte Carlo results are usually benchmarked to neutron source measurements such as californium. For active techniques, the modeling becomes more difficult because of the interaction of the interrogation source with the detector and nuclear material; and the results cannot be simply benchmarked with neutron sources. A Monte Carlo calculated calibration curve for a training course in Indonesia of material test reactor (MTR) fuel elements assayed with an active well coincidence counter (AWCC) will be presented as an example. Performing training activities with reduced amounts of nuclear material makes it difficult to demonstrate how the multiplication and matrix properties of the item affects the detector response and limits the knowledge that can be obtained with hands-on training. A neutron pulse simulator (NPS) has been developed that can produce a pulse stream representative of a real pulse stream output from a detector measuring SNM. The NPS has been used by the International Atomic Energy Agency (IAEA) for detector testing and training applications at the Agency due to the lack of appropriate SNM standards. This paper will address the effect of reduced access to SNM for calibration and training of neutron NDA applications along with the advantages and disadvantages of some solutions that do not use standards, such as the Monte Carlo techniques and the NPS.

Geist, William H [Los Alamos National Laboratory; Swinhoe, Martyn T [Los Alamos National Laboratory; Bracken, David S [Los Alamos National Laboratory; Freeman, Corey R [Los Alamos National Laboratory; Newell, Matthew R [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

295

New ARM Data Stream: Surface Images at NSA/AAO Sites in Barrow...  

NLE Websites -- All DOE Office Websites (Extended Search)

being delivered to the ARM archive. In Barrow, the camera resides at the top of the 40-meter tower. In Atqasuk, the camera is placed on a post attached to a piling near the...

296

Data:8d487701-c1da-437a-b20e-87dc9dbe518d | Open Energy Information  

Open Energy Info (EERE)

01-c1da-437a-b20e-87dc9dbe518d 01-c1da-437a-b20e-87dc9dbe518d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Taylor County Rural E C C Effective date: 2011/06/01 End date if known: Rate name: Schedule B2 - Large Industrial Rate Sector: Industrial Description: Applicable to contracts with demands of 5,000 to 9,999 KW with a monthly energy usage equal to or greater than 400 hours per KW of billing demand. Source or reference: Kentucky Public Service Commission Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

297

Data:55382dd3-14cc-4a5c-a48c-1b867c9a51b6 | Open Energy Information  

Open Energy Info (EERE)

14cc-4a5c-a48c-1b867c9a51b6 14cc-4a5c-a48c-1b867c9a51b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Knoxville Utilities Board Effective date: 2013/06/01 End date if known: Rate name: SCHEDULE TDMSA Sector: Industrial Description: Source or reference: http://www.kub.org/wps/wcm/connect/4f9cea0046acbbdda025b8feb064034c/TDMSAv2.pdf?MOD=AJPERES&CACHEID=4f9cea0046acbbdda025b8feb064034c Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

298

Data:5288c1e0-b524-41a9-bb8b-b7168f13914c | Open Energy Information  

Open Energy Info (EERE)

8c1e0-b524-41a9-bb8b-b7168f13914c 8c1e0-b524-41a9-bb8b-b7168f13914c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sulphur Springs Valley E C Inc Effective date: 2013/03/18 End date if known: Rate name: 400 Watt MV - Single/Steel Sector: Lighting Description: Customer provided Facilities and Cooperative Owned and Maintained Lighting Service. Source or reference: http://www.ssvec.org/wp-content/uploads/downloads/2013/03/SSVEC-Rates-03.18.13.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

299

Data:F778d669-a0c1-4113-8157-fb53b71b085a | Open Energy Information  

Open Energy Info (EERE)

8d669-a0c1-4113-8157-fb53b71b085a 8d669-a0c1-4113-8157-fb53b71b085a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Nodak Electric Coop Inc Effective date: 2012/05/20 End date if known: Rate name: GS Urban-Single Phase ST Sector: Residential Description: Additional Meters (Off-Peak Included) $ 3.60/Meter/Month Renewable Energy Market Adjustment $0.003/KWH (Added to All Above Energy Rates) Controlled Water Heater Credit $.00736/KWH Applies to the first 1,000 KWHs each month (October-March) Source or reference: http://www.nodakelectric.com/wp-content/uploads/2011/04/General-Service-Rates-Farm-Rural-Residential-and-Small-Commercial.pdf

300

Data:B6b8099e-a751-4105-9c1a-389633a5ad94 | Open Energy Information  

Open Energy Info (EERE)

B6b8099e-a751-4105-9c1a-389633a5ad94 B6b8099e-a751-4105-9c1a-389633a5ad94 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tacoma, Washington (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: Schedule H-1 - High Intensity Discharge 100 Watts - Dusk to Dawn Sector: Lighting Description: Source or reference: www.mytpu.org/file_viewer.aspx?id=6170 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Data:E33f05cb-bf81-43ab-99df-6c1ff4b54d7e | Open Energy Information  

Open Energy Info (EERE)

E33f05cb-bf81-43ab-99df-6c1ff4b54d7e E33f05cb-bf81-43ab-99df-6c1ff4b54d7e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York Power Authority Effective date: 2013/07/01 End date if known: Rate name: RNY-1 (Zone K Hydro) Sector: Residential Description: Source or reference: http://www.nypa.gov/about/documents.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

302

Data:121c31d8-4726-4c1c-abad-09ec92532adb | Open Energy Information  

Open Energy Info (EERE)

d8-4726-4c1c-abad-09ec92532adb d8-4726-4c1c-abad-09ec92532adb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Rock Hill, South Carolina (Utility Company) Effective date: End date if known: Rate name: Public School Rate (Schedule PS) V2 Sector: Description: public school that fits the following criteria: (I) has an average monthly metered demand during the most recent twelve month period, in excess of 300 kw; (ii) has an average monthly metered demand during the months of May, June, July and August (summer months) not more than fifty (50) percent of the highest month of the previous eight months (September through April) ; and (iii) has not been served by the City prior to the date on which service of such load under this Rate Schedule commences. Service under this Rate Schedule will be available to the qualifying customer through a single meter at one delivery point. Continued service under this Rate Schedule shall be subject to the load continuing to meet the aforementioned criteria.

303

Data:4ed1b9ce-a8ab-4c63-a77e-92aa800c1c8d | Open Energy Information  

Open Energy Info (EERE)

a8ab-4c63-a77e-92aa800c1c8d a8ab-4c63-a77e-92aa800c1c8d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Connecticut Light & Power Co Effective date: 2013/07/01 End date if known: Rate name: Rate 37 - Intermediate Time-of-Day General Electric Service (Bundled Service Transmission Discount) Sector: Commercial Description: AVAILABLE for the electrical requirements where the customer's maximum demand is equaled or exceeded in the last twelve months, or shall equal or exceed in the next twelve months, 200 kW but less than 350 kW and delivered at one point and at one standard voltage through one installation of transformers supplied by the Company. Service will be metered at one point by one installation of meters. The meter location will be determined by the Company. Where the Company deems it impractical to deliver electricity through one service, or where more than one meter has been installed for billing under a withdrawn rate, then the measurement of electricity may be by two or more meters.

304

Data:0ada1957-9e17-45f9-9171-b4e69af2b2c1 | Open Energy Information  

Open Energy Info (EERE)

ada1957-9e17-45f9-9171-b4e69af2b2c1 ada1957-9e17-45f9-9171-b4e69af2b2c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Coast Electric Power Assn Effective date: 2011/04/01 End date if known: Rate name: Light Service Ornamental 175 W w/ Ornamental Pole Sector: Lighting Description: *Fixed monthly charge is the sum of fixture charge, energy charge, and pole charge. Adjustment includes power cost adjustment rider and tax expense adjustment rider Source or reference: http://www.coastepa.com/documents/Rate7H.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

305

Data:6b52532c-e35d-469e-8f2b-8688560271c1 | Open Energy Information  

Open Energy Info (EERE)

c-e35d-469e-8f2b-8688560271c1 c-e35d-469e-8f2b-8688560271c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lakeland, Florida (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: Private Area Lighting HPS 100 Watt - Flood - Service Option C Sector: Lighting Description: Service Options A. Fixture and Installation Only; B. Maintenance of Fixture Only; C. Energy, Excluding Fuel Charge, for Fixture Only; and D. Full Service: The sum of each of the above Discrete Private Area Lighting Charges (A+B+C), plus the monthly service charge Source or reference: http://www.lakelandelectric.com/Portals/0/docs/pdf/Rates%20&%20Pricing/Electric%20Rates%20Tariffs/html/files/assets/common/downloads/publication.pdf

306

Data:869e878c-1f35-4254-a2f3-908a6e6544c0 | Open Energy Information  

Open Energy Info (EERE)

e878c-1f35-4254-a2f3-908a6e6544c0 e878c-1f35-4254-a2f3-908a6e6544c0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rita Blanca Electric Coop, Inc Effective date: 2009/01/01 End date if known: Rate name: Dairy Facilities Sector: Commercial Description: *Subject to Power Cost Adjustment Factor and Power Factor Adjustment. Source or reference: http://ritablancaelectric.com/page5.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

307

Data:25bf879d-0999-43b3-90c1-34c602fd08e8 | Open Energy Information  

Open Energy Info (EERE)

d-0999-43b3-90c1-34c602fd08e8 d-0999-43b3-90c1-34c602fd08e8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Cp-1 Small Power Service Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

308

Data:Cd0618aa-4f2c-4c97-ae06-1b543c1ed21b | Open Energy Information  

Open Energy Info (EERE)

618aa-4f2c-4c97-ae06-1b543c1ed21b 618aa-4f2c-4c97-ae06-1b543c1ed21b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Corn Belt Energy Corporation Effective date: 2006/10/31 End date if known: Rate name: RATE 12 RESIDENTIAL ELECTRICALLY HEATED APARTMENTS Sector: Residential Description: Applicable to all residential apartments for uses including lighting, power and whose entire space heating requirements are supplied by the cooperative; the major portion of which is permanently installed. For purpose of this rate electric space heating shall include only resistance heating devices and electrically operated heat pumps (except heat pumps which obtain heat from the use of another fuel) or a combination of such facilities and solar energy collectors providing space heating through heat exchangers.

309

Data:B805e1c1-fd66-42b6-8ee0-67d298899bab | Open Energy Information  

Open Energy Info (EERE)

c1-fd66-42b6-8ee0-67d298899bab c1-fd66-42b6-8ee0-67d298899bab No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Foley Board of Utilities Effective date: 2012/03/01 End date if known: Rate name: Public Street and Highway Lighting- Utility-Owned Fixtures- 9,500 Lumen High Pressure Sodium Sector: Lighting Description: This rate is available to any municipality in which the Utility operates the local electric distribution system or to Baldwin County or to the State of Alabama for service along any highway adjacent to an electric distribution system of the Utility. Source or reference: http://www.rivierautilities.com/pdf/rates/rate_610_2012_03.pdf

310

Data:33cfed80-f4c1-4e9d-b340-fbe6885af015 | Open Energy Information  

Open Energy Info (EERE)

cfed80-f4c1-4e9d-b340-fbe6885af015 cfed80-f4c1-4e9d-b340-fbe6885af015 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Readsboro, Vermont (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: Outdoor Lighting Rate 18- Street and Area Light (40 LED 67 System W) Sector: Lighting Description: Street, area and flood lighting, traffic signal and specialty lighting equipment, energy and maintenance service is available within Green Mountain Power Corporation's ("GMP") service territory under this rate for GMP-owned or Customer-owned equipment to any city, village, town, fire district, political subdivision, Customer association or individual Customer in accordance with the specifications hereinafter set forth.

311

Data:20ce9f60-660b-4c65-bb8c-1a57b213627d | Open Energy Information  

Open Energy Info (EERE)

660b-4c65-bb8c-1a57b213627d 660b-4c65-bb8c-1a57b213627d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Plymouth, Wisconsin (Utility Company) Effective date: 2011/12/22 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 9am-9pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0774 per kilowatt-hour.

312

Data:056f87d9-6230-40c1-919e-f5d55c56db42 | Open Energy Information  

Open Energy Info (EERE)

d9-6230-40c1-919e-f5d55c56db42 d9-6230-40c1-919e-f5d55c56db42 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Tell City, Indiana (Utility Company) Effective date: 2009/09/01 End date if known: Rate name: Schedule ED-F1: Economic Development Rider Sector: Industrial Description: Available to consumers who qualify under the provisions of Tariff F and Tariff F1 and meet the following criteria: New Consumers: Must have monthly minimum billing demand of 25 KVA to 400 KVA. Existing Consumers: Must increase the monthly unadjusted billing demand by at least 25 KVA over the base average billing demand during the previous 2 to 12 months.

313

Data:5805ae80-0c1d-4b29-bf6b-5a22dcef04ce | Open Energy Information  

Open Energy Info (EERE)

0-0c1d-4b29-bf6b-5a22dcef04ce 0-0c1d-4b29-bf6b-5a22dcef04ce No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Eagle River, Wisconsin (Utility Company) Effective date: 2009/08/04 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service above 200kW Demand Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base

314

Data:0b287614-c1ab-4620-a365-f4e3e5c9dd65 | Open Energy Information  

Open Energy Info (EERE)

7614-c1ab-4620-a365-f4e3e5c9dd65 7614-c1ab-4620-a365-f4e3e5c9dd65 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeastern Rural E M C Effective date: 2012/02/27 End date if known: Rate name: Rental Lighting: RL-11 HPS Flood 250W Sector: Lighting Description: I. AVAILABILITY This schedule is available to any customer of Northeastern REMC (Northeastern) for continuous year round service for outdoor lighting where 120-volt service exists ahead of the meter loop. II. CHARACTER OF SERVICE Dusk-to-dawn lighting service will be furnished, using photoelectric controlled equipment, mast arm, light luminaire and bulb installed on an existing pole. Maintenance of the complete assembly and the cost of its electrical operation are included in this service. Except as provided for herein, any additional investment required for the sole purpose of providing this service shall require a contribution by the customer equal to the actual investment cost.

315

Data:Ec1da96a-697f-414f-b50e-c1dbe4f012bb | Open Energy Information  

Open Energy Info (EERE)

da96a-697f-414f-b50e-c1dbe4f012bb da96a-697f-414f-b50e-c1dbe4f012bb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Mississippi Power Co Effective date: 2013/03/19 End date if known: Rate name: RIDER SCHEDULE - "SPH-14" Sector: Residential Description: This rider schedule is supplemental to the standard residential rate and applies to electric service used by one customer in a single family dwelling on one premise through a separate meter for the purpose of heating swimming pool water. All service under this rate schedule is available on a uniform basis throughout the service territory of Company. The kind of service shall be single phase at nominal service voltage of Company's secondary distribution system serving area.

316

Data:70f637ce-d458-447b-9fc1-56d3c63c1f12 | Open Energy Information  

Open Energy Info (EERE)

ce-d458-447b-9fc1-56d3c63c1f12 ce-d458-447b-9fc1-56d3c63c1f12 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Story City, Iowa (Utility Company) Effective date: 2004/01/01 End date if known: Rate name: Mercury Vapor - 175 Watt - Not Metered Sector: Lighting Description: Source or reference: Ted binder 1 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

317

Data:719868b8-39c1-4777-a2e0-df4c57e4c490 | Open Energy Information  

Open Energy Info (EERE)

8b8-39c1-4777-a2e0-df4c57e4c490 8b8-39c1-4777-a2e0-df4c57e4c490 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconto Falls Water & Light Comm Effective date: 2007/10/13 End date if known: Rate name: Ms-1 Street and Yard Lighting Service Overhead 120 W IND Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0847 per kilowatt-hour.

318

Data:30811e00-ddf8-4bb5-b453-1f5e6c1d60bb | Open Energy Information  

Open Energy Info (EERE)

-ddf8-4bb5-b453-1f5e6c1d60bb -ddf8-4bb5-b453-1f5e6c1d60bb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lighthouse Electric Coop, Inc Effective date: 2010/06/01 End date if known: Rate name: Security Lighting 400W HPS Sector: Lighting Description: Energy Usage 160KWH Source or reference: Rate Binder 5, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

319

Data:F81719da-8efa-4c1b-ab7e-cc59b1d3a531 | Open Energy Information  

Open Energy Info (EERE)

8efa-4c1b-ab7e-cc59b1d3a531 8efa-4c1b-ab7e-cc59b1d3a531 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Ohio Inc Effective date: 2013/05/06 End date if known: Rate name: Rate OL - Outdoor Lighting Service - SV 200 Watts/30,000 lumens - Flood Sector: Lighting Description: Applicable for outdoor lighting services on private property with Company owned fixtures in the Company's entire service area where secondary distribution lines are adjacent to the premises to be served. Not applicable for lighting public roadways which are dedicated, or anticipated to be dedicated, except to meet the occasional singular need of a customer who has obtained written approval from the proper governmental authority.

320

Data:811dfc90-bd3b-42b0-8cbe-448c757be1c1 | Open Energy Information  

Open Energy Info (EERE)

0-bd3b-42b0-8cbe-448c757be1c1 0-bd3b-42b0-8cbe-448c757be1c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Franklin Rural Electric Cooperative Effective date: 2010/05/01 End date if known: Rate name: Multi-Phase (Over 100 kVa) Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/199/Franklin%20Rural%20Electric%20Coop,%20IA.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Data:F34100c1-288d-4666-97bf-505188f5ac04 | Open Energy Information  

Open Energy Info (EERE)

c1-288d-4666-97bf-505188f5ac04 c1-288d-4666-97bf-505188f5ac04 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Blue Grass Energy Coop Corp Effective date: 2011/06/01 End date if known: Rate name: 250 Watt HPS- Open Bottom Sector: Lighting Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/125/1%20COOP,%20KY,%20Blue%20Grass%20Energy%20Tariff-2.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

322

Data:8cb18443-8fec-427f-b3c1-d23f6f571971 | Open Energy Information  

Open Energy Info (EERE)

443-8fec-427f-b3c1-d23f6f571971 443-8fec-427f-b3c1-d23f6f571971 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Modesto Irrigation District Effective date: 2011/01/01 End date if known: Rate name: Schedule FL Flat Rate Service-In Excess of 50% Load Factor 1601 - 1800 Watt Sector: Commercial Description: Applicability This Schedule is applicable to small, constant, non-metered incidental loads for utilities, communication agencies, state agencies, and applicable special districts where the customer owns and maintains the equipment. The customer must supply equipment wattage to the District. Such loads would include: Cathodic Protection Stations Motor Radial Gates Pressure Point Automatic Watering Systems Flashing Beacons Sign Illumination Communication Power Booster Devices Monthly Usage: 1117kWh

323

Data:496a695f-acb5-41a3-8e6f-047bb19064c1 | Open Energy Information  

Open Energy Info (EERE)

f-acb5-41a3-8e6f-047bb19064c1 f-acb5-41a3-8e6f-047bb19064c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hawaiian Electric Co Inc Effective date: 2012/09/01 End date if known: 2013/09/30 Rate name: SCHEDULE EV-C COMMERCIAL ELECTRIC VEHICLE CHARGING SERVICE PILOT - Non-Demand Service Sector: Commercial Description: APPLICABILITY: This Schedule is applicable only for commercial charging of batteries of on-road electric vehicles. The battery charged must have a capacity of not less than 4 kilowatt hours, and the electric vehicle must be capable of operation on public streets, roads, and highways. The load served under this Schedule will be separately metered from all other commercial electrical load and will be used exclusively for the purpose of charging electric vehicle batteries. Customers taking service under Schedule EV-C must demonstrate eligibility to the satisfaction of the utility.

324

Data:C311de63-2164-493d-8fd5-22c1d16b1755 | Open Energy Information  

Open Energy Info (EERE)

1de63-2164-493d-8fd5-22c1d16b1755 1de63-2164-493d-8fd5-22c1d16b1755 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cleco Power LLC Effective date: 2011/02/01 End date if known: Rate name: Company-Owned Fixture - Cobra Head 250 Watt HPS Sector: Lighting Description: Source or reference: www.cleco.com Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >>

325

Data:C2221b0f-8650-4eda-9497-0c1f57c393de | Open Energy Information  

Open Energy Info (EERE)

21b0f-8650-4eda-9497-0c1f57c393de 21b0f-8650-4eda-9497-0c1f57c393de No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Texas Elec Coop, Inc Effective date: 2012/04/01 End date if known: Rate name: Security Lights(250 Watt High Pressure Sodium) Sector: Lighting Description: *KWh Allowance=100 KWh per month. When a security light is situated on the member's side of the meter, the kilowatt hours consumed in the operation of the light will be billed the Power Cost-Pass-Through and the Distribution Energy Charge as metered. When a security light is situated on the Cooperative's side of the meter, and the energy is not metered, the Power Cost Pass-Through shall be billed based on the kilowatt hour allowance above.

326

Data:8bca71bb-11e8-4c1d-ab8a-ea822cea4cd0 | Open Energy Information  

Open Energy Info (EERE)

bca71bb-11e8-4c1d-ab8a-ea822cea4cd0 bca71bb-11e8-4c1d-ab8a-ea822cea4cd0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grand River Dam Authority Effective date: 2011/01/07 End date if known: Rate name: general service Sector: Commercial Description: Source or reference: http://www.grda.com/electric/customer-service/retail-sales/general-service/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

327

Data:Dfc73905-2f20-4376-a879-1f621c1fed93 | Open Energy Information  

Open Energy Info (EERE)

Dfc73905-2f20-4376-a879-1f621c1fed93 Dfc73905-2f20-4376-a879-1f621c1fed93 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Manitowoc Public Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-4 Large Industrial Power Time-of-Day Service(<6000 volts) Primary Metering Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0361 per kilowatt-hour.

328

Data:414d7251-06c6-4bfb-8391-5fa581c1bef9 | Open Energy Information  

Open Energy Info (EERE)

251-06c6-4bfb-8391-5fa581c1bef9 251-06c6-4bfb-8391-5fa581c1bef9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Orrville, Ohio (Utility Company) Effective date: 2006/01/01 End date if known: Rate name: General service-medium(outside corporate limits) Sector: Commercial Description: For any non-residential use through a single meter at the Utility's standard voltages up to a nominal limit of 90 kva demand. The customer is responsible for furnishing, installing and maintaining his transformers, etc. At the discretion of the Utility, customer with less than 55 kva demand may be metered at the secondary voltage and customers with 55 kva demand and above may be metered at the primary voltage. Governed in more detail by the Standard Rules and Regulations of the City.

329

Data:4ead6339-0805-4e30-be56-c1ba3f1d2128 | Open Energy Information  

Open Energy Info (EERE)

ead6339-0805-4e30-be56-c1ba3f1d2128 ead6339-0805-4e30-be56-c1ba3f1d2128 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Lakeland, Florida (Utility Company) Effective date: 2013/04/01 End date if known: Rate name: General Service Plug-In Electric Vehicle Service Time-of-Day Sector: Commercial Description: To electric service customers currently billed from Rate Schedules GSX-1 and GST-1 requiring power at greater than 120 volts for plug-in electric vehicle (PEV) charging purposes. Power used to service PEV charging stations or equipment is subject to the following requirements: 1.100 percent of the energy used is exclusively for PEV charging purposes.

330

Data:35cdeed2-d1b2-401f-92c1-9765adfb0d6a | Open Energy Information  

Open Energy Info (EERE)

cdeed2-d1b2-401f-92c1-9765adfb0d6a cdeed2-d1b2-401f-92c1-9765adfb0d6a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Austin Energy Effective date: End date if known: Rate name: LARGE PRIMARY SERVICE SPECIAL CONTRACT - INDUSTRIAL RIDER Sector: Industrial Description: This rate applies to electric service to any customer that qualifies for service and has executed a contract under the Large Primary Service - Special Contract Rider I or II and thereafter has (1) reached a billing demand of at least 25,000 kilowatts during any two months within the previous six months, and (2) maintained an average load factor of at least 85% during the previous six months. Any action by the customer resulting in measurable reduction in peak demand or energy use may be taken into account by the City, in its sole discretion, when applying the demand and load factor requirements of this tariff.

331

Data:0ae30c5b-10a7-42c1-9483-f22d24fcde41 | Open Energy Information  

Open Energy Info (EERE)

ae30c5b-10a7-42c1-9483-f22d24fcde41 ae30c5b-10a7-42c1-9483-f22d24fcde41 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: NSTAR Electric Company Effective date: 2012/06/01 End date if known: Rate name: ACTON Streetlighting -S-2 (C2/C4) Sector: Lighting Description: Service under this rate is available to the public authorities, such as municipalities, state and federal agencies, for the operation of a public street, park or highway lighting system. including street light equipment purchased pursuant to M.G.L. c. 164 § 34A, owned, operated and maintained by such agencies, on a standard 4,200 hour per year dusk-to-dawn lighting schedule; and for the operation of fire alarm lighting service and traffic signals. This rate is not available for lighting service on private property nor for commercial, industrial or residential use. Service under this rate is subject to the Company's printed requirements and the Company's Terms and Conditions - Distribution Service, each as in effect from time to time.

332

Data:F36b6c79-05b4-4825-903c-1c38453eddfd | Open Energy Information  

Open Energy Info (EERE)

c79-05b4-4825-903c-1c38453eddfd c79-05b4-4825-903c-1c38453eddfd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Jackson Center, Ohio (Utility Company) Effective date: 2001/04/30 End date if known: Rate name: Large Power Service- Primary Metering Sector: Industrial Description: This schedule is available to all Customers located along electric distribution lines of Utility who use Utility's standard primary or secondary service and who guarantee the monthly billing capacity specified by service application of contract, but not less than 50 kW. The kW billing demand shall be the highest measured 15-minute integrated or equivalent thermal kW demand, determined to the nearest kW.

333

Data:7401a547-cd76-4d46-8042-6c1e4e17aa10 | Open Energy Information  

Open Energy Info (EERE)

cd76-4d46-8042-6c1e4e17aa10 cd76-4d46-8042-6c1e4e17aa10 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Princeton, Wisconsin (Utility Company) Effective date: 2006/09/14 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day Three Phase 7am-7pm Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0524 per kilowatt-hour.

334

Data:2e88c1bb-8cad-4a8c-b152-22caebab578b | Open Energy Information  

Open Energy Info (EERE)

c1bb-8cad-4a8c-b152-22caebab578b c1bb-8cad-4a8c-b152-22caebab578b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconto Falls Water & Light Comm Effective date: 2010/10/13 End date if known: Rate name: Rg-1 Residential Service Three Phase with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0847 per kilowatt-hour.

335

Data:Bf59468e-62c1-4fff-9f29-c55a5a71201e | Open Energy Information  

Open Energy Info (EERE)

8e-62c1-4fff-9f29-c55a5a71201e 8e-62c1-4fff-9f29-c55a5a71201e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Duke Energy Indiana Inc Effective date: 2009/09/14 End date if known: Rate name: AL - 1000 watt MH - Cutoff Sector: Commercial Description: Availability This rate schedule is no longer available after September 1, 2004. Potential lighting customers wanting a lighting system installed and maintained by Company can do so via the Outdoor Lighting Equipment agreement (OLE). Potential customers should contact a Company account representative for further information concerning OLE options. This rate schedule terminates May 1, 2014. Customers currently being provided service under this rate schedule can continue being provided service under this rate schedule until their contract expires or this rate schedule terminates, whichever occurs first.

336

Data:4e58ac53-e1c1-4117-9521-0f8e7129b962 | Open Energy Information  

Open Energy Info (EERE)

ac53-e1c1-4117-9521-0f8e7129b962 ac53-e1c1-4117-9521-0f8e7129b962 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cleveland, Ohio (Utility Company) Effective date: End date if known: Rate name: Street Lighting ornamental, 150w hps(E and M), 30 ft steel pole Sector: Lighting Description: street lighting,ornamental high pressure sodium 150 watt(E and M) with maximum 71kwh per lamp Source or reference: http://www.cpp.org/CPP%20RRR%20ORDINANCE%20as%20of%2011-14-06.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

337

Data:5f4499c1-0a59-499d-aad8-072b8c22ac96 | Open Energy Information  

Open Energy Info (EERE)

c1-0a59-499d-aad8-072b8c22ac96 c1-0a59-499d-aad8-072b8c22ac96 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Gs-2 General Service Time-of-Day 9am-9pm Three Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0765 per kilowatt-hour.

338

Data:95e5e3af-1bf4-439a-a1c1-fd6167cd03cc | Open Energy Information  

Open Energy Info (EERE)

e3af-1bf4-439a-a1c1-fd6167cd03cc e3af-1bf4-439a-a1c1-fd6167cd03cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elkhorn, Wisconsin (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: Gs-1 General Service Single Phase less than 75kW Demand with Parallel Generation(20 kW or less)-Net Energy Billing Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0509 per kilowatt-hour.

339

Data:Cd4ce0c1-8973-492e-a967-3e0533be82f7 | Open Energy Information  

Open Energy Info (EERE)

c1-8973-492e-a967-3e0533be82f7 c1-8973-492e-a967-3e0533be82f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: San Luis Valley R E C, Inc Effective date: 2013/01/01 End date if known: Rate name: Single Phase Service Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

340

Data:531c3744-f41a-436d-bf01-30a799c0c1bd | Open Energy Information  

Open Energy Info (EERE)

1a-436d-bf01-30a799c0c1bd 1a-436d-bf01-30a799c0c1bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 9am-9pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Data:99c6c1d0-850a-414e-bde2-3739830b1bd4 | Open Energy Information  

Open Energy Info (EERE)

c1d0-850a-414e-bde2-3739830b1bd4 c1d0-850a-414e-bde2-3739830b1bd4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy Arkansas Inc (Arkansas) Effective date: 2010/06/30 End date if known: Rate name: 2 RT Optional residential time-of-use Sector: Residential Description: For residential service to single family residences or individual family apartments supplied through one meter, including incidental family use, on the appurtenant premises. This rate is not applicable to commercial type use on the appurtenant premises such as chicken brooding and grain drying. Where a portion of the residence premises is used for nonresidential purposes, the predominant use of the service, as determined by the company, shall determine the rate applicable to all service. Service is not for the use of the customer and may not be shared and may not be resold to others. Not applicable to standby or supplementary service.

342

Data:4da34fe5-c291-41df-9d53-fbd1f46e49c1 | Open Energy Information  

Open Energy Info (EERE)

4fe5-c291-41df-9d53-fbd1f46e49c1 4fe5-c291-41df-9d53-fbd1f46e49c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Electric Coop, Inc (Pennsylvania) Effective date: 2001/09/01 End date if known: Rate name: Security Light - HPS Flood Light Sector: Lighting Description: Available to all members of Cooperative for outdoor lighting. Source or reference: http://www.central.coop/wp-content/uploads/2011/12/Rate-Schedules-20121.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

343

Data:F10a15ee-65ad-4400-b5f3-1a94c1ac54da | Open Energy Information  

Open Energy Info (EERE)

ee-65ad-4400-b5f3-1a94c1ac54da ee-65ad-4400-b5f3-1a94c1ac54da No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Austin Energy Effective date: 2012/10/01 End date if known: Rate name: Commercial - Primary Voltage 3 MW to 20 MW Sector: Commercial Description: There are additional fees of the Community Benefit Charge and Regulatory Charge of $0.00288 per kWh respectively and $2.92 per kW respectively. Source or reference: http://www.austinenergy.com/About%20Us/Rates/index.htm Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

344

Data:15d2ee68-2d08-4850-91dd-a11c1f9e2128 | Open Energy Information  

Open Energy Info (EERE)

ee68-2d08-4850-91dd-a11c1f9e2128 ee68-2d08-4850-91dd-a11c1f9e2128 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carroll Electric Member Corp Effective date: 2012/02/01 End date if known: Rate name: Outdoor Lighting Underground Wiring Fiberglass Pole MH 1000 W Sector: Lighting Description: *IDC Rider Charges included in Fixed Monthly Charge $825 one time charge for instillation Source or reference: http://www.cemc.com/Files/OL-2%20Outdoor%20Lighting%20final%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh):

345

Data:92e743c7-c438-46df-a7ad-c1b5e89c080e | Open Energy Information  

Open Energy Info (EERE)

43c7-c438-46df-a7ad-c1b5e89c080e 43c7-c438-46df-a7ad-c1b5e89c080e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kosciusko County Rural E M C Effective date: 2011/02/03 End date if known: Rate name: Industrial - Schedule I-DG Sector: Industrial Description: AVAILABILITY Service under this schedule is available to members of the Kosciusko Rural Electric Membership Corporation (KREMC) that have a connected load requiring installed transformer capacity in excess of 75 kVA, have generation equipment with a total nameplate capacity greater than 10 kW, and have executed an Agreement for Interconnection of Distributed Generation contract with KREMC.

346

Data:332f6d53-0e73-43c9-83c1-877658147e1f | Open Energy Information  

Open Energy Info (EERE)

d53-0e73-43c9-83c1-877658147e1f d53-0e73-43c9-83c1-877658147e1f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/10/01 End date if known: Rate name: Large commercial schedule(Demand Charge)-within corporate limits Sector: Commercial Description: Tiered demand For the purpose of paying the expenses of conducting and managing the Electric Division, Utilities Department of the City, the City Manager is hereby authorized and directed to charge the following rates for furnishing electric current for any commercial or industrial consumer having a demand equal to or in excess of 30 KW during the current month or any of the preceding eleven months, which rates are hereby adopted; for all utility bills issued on and after October 1, 1990

347

Data:967bd89f-51c1-4190-9953-f5c5e52595d0 | Open Energy Information  

Open Energy Info (EERE)

bd89f-51c1-4190-9953-f5c5e52595d0 bd89f-51c1-4190-9953-f5c5e52595d0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kosciusko County Rural E M C Effective date: 2011/02/01 End date if known: Rate name: Large Power - Seasonal - Schedule LP-S Sector: Industrial Description: AVAILABILITY Any member of the Kosciusko Rural Electric Membership Corporation (KREMC) with permanently installed irrigation or grain dryer equipment load requiring installed transformer capacity in excess of 50 kVA and having a separate service through a separate meter must take service under this rate schedule. CHARACTER OF SERVICE Alternating current, 60 hertz, at 120/240 volts, or such other voltage as might be mutually agreed upon.

348

Data:Bdbb9344-e8af-49d6-9f48-042c1fd1c5ad | Open Energy Information  

Open Energy Info (EERE)

Bdbb9344-e8af-49d6-9f48-042c1fd1c5ad Bdbb9344-e8af-49d6-9f48-042c1fd1c5ad No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Manitowoc Public Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-4 Large Industrial Power Time-of-Day Service(<6000 Volts) with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0361 per kilowatt-hour.

349

Data:C88dd62b-ad0a-4613-946c-1d5c8726b092 | Open Energy Information  

Open Energy Info (EERE)

2b-ad0a-4613-946c-1d5c8726b092 2b-ad0a-4613-946c-1d5c8726b092 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co Effective date: 2011/10/01 End date if known: Rate name: Large General Service - Time of Day TRANSMISSION Off-Peak Sector: Commercial Description: RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. CC APPLICATION OF SCHEDULE: This schedule is applicable to nonresidential Customers with a measured Demand of at least 80 kW within the most recent 12 months. Source or reference: https://www.otpco.com/RatesPricing/Documents/PDF/MN/MN_10.05.pdf

350

Data:07ca4e07-98c1-499e-b585-516dd49deed4 | Open Energy Information  

Open Energy Info (EERE)

-98c1-499e-b585-516dd49deed4 -98c1-499e-b585-516dd49deed4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Orange & Rockland Utils Inc Effective date: 2012/04/01 End date if known: Rate name: SC16 Power Bracket Sodium Vapor Overhead and Underground 70w (Customer owned, full service) Sector: Description: APPLICABLE TO USE OF SERVICE FOR: Sales and delivery of electric power supply provided by the Company or delivery of electric power supply provided by an Energy Service Company under the Company's Retail Access Program for outdoor lighting of areas, beyond the limits of public streets, highways or roadways, for use of individuals and private or public organizations where existing distribution facilities are suitable for the service requested.

351

Data:2a139df7-a45b-4c1d-979a-cd797dc281ff | Open Energy Information  

Open Energy Info (EERE)

df7-a45b-4c1d-979a-cd797dc281ff df7-a45b-4c1d-979a-cd797dc281ff No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Taylor County Rural E C C Effective date: 2011/09/30 End date if known: Rate name: Commercial & Industrial Advanced Lighting Program Sector: Commercial Description: Availability: This program is available to commercial and industrial facilities located in all service territory served by EKPC. Eligibility: To qualify for the Commercial & Industrial Advanced Lighting Program the customer must be on a retail commercial or industrial rate. The business must have been in operations for at least two years prior to January 1, 2011, and be current on its power bill payment to the Member System. No empty buildings, inactive warehouses, or inactive storage areas shall qualify. The business must be open or have its normal lighting load on for at least 50 hours per week. Retrofits of parking lot lighting, provided on photocell control, are eligible.

352

Data:49994e9b-93d6-49e9-82c1-30e25523bf43 | Open Energy Information  

Open Energy Info (EERE)

e9b-93d6-49e9-82c1-30e25523bf43 e9b-93d6-49e9-82c1-30e25523bf43 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 3 of Mason County Effective date: 2009/04/01 End date if known: Rate name: 500 WATT Sector: Commercial Description: Source or reference: http://www.masonpud3.org/rates/outdoorLights.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1

353

Data:71e3f86c-1e4f-401a-8ebd-88a620445f8e | Open Energy Information  

Open Energy Info (EERE)

f86c-1e4f-401a-8ebd-88a620445f8e f86c-1e4f-401a-8ebd-88a620445f8e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Guard Lighting (HPS 100w) Sector: Lighting Description: The lighting fixtures served under this rate schedule will be served at standard secondary voltages as determined by Company. This tariff is applicable to any Retail Customer receiving un-metered service for one or more Company approved lighting fixtures which operate automatically every night from dusk to dawn and can be either: (1.) a Customer Owned Fixture or (2.) a Company Owned Fixture. The Company will install, make electrical connection(s), and maintain the lighting fixture(s).

354

Data:C5141fae-b070-4391-a6c1-2b7edd550844 | Open Energy Information  

Open Energy Info (EERE)

41fae-b070-4391-a6c1-2b7edd550844 41fae-b070-4391-a6c1-2b7edd550844 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Arizona Public Service Co Effective date: 2011/07/01 End date if known: Rate name: General Service over 20 kW, under 3,000 kW Sector: Commercial Description: APPLICATION The Transmission Cost Adjustment ("TCA") charge shall apply to all Standard Offer retail electric schedules, with the exception of Solar-2. All provisions of the customer's current applicable rate schedule will apply in addition to this charge. ANNUAL ADJUSTMENT Standard Offer rate schedules covered by this charge include a transmission component of base rates that was originally established at $0.00476 per kilowatt-hour in accordance with A.C.C. Decision No. 67744. Decision No. 67744 also established the TCA. Decision No. 69663 modified the collection of transmission costs in retail rates to tie to the costs found in the FERC approved Open Access Transmission Tariff.

355

Data:0ec40495-2f5a-4c1e-b5cc-e63eec97da96 | Open Energy Information  

Open Energy Info (EERE)

5-2f5a-4c1e-b5cc-e63eec97da96 5-2f5a-4c1e-b5cc-e63eec97da96 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Western Area Power Administration Effective date: 2009/06/01 End date if known: Rate name: Schedule R-8 Farm and Home Sector: Residential Description: Applicable to farm and home consumers for all farm and home uses, and to schools, churches and community halls. Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

356

Data:8224e1ec-59f7-4b3e-a948-b7c1e69d7992 | Open Energy Information  

Open Energy Info (EERE)

e1ec-59f7-4b3e-a948-b7c1e69d7992 e1ec-59f7-4b3e-a948-b7c1e69d7992 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Public Street Lighting Service - HPSV Double Mastarm Lamp Fixtures - Contemporary Aluminum Pole - Company Owned Sector: Lighting Description: To the City of Independence for all Public Street Lighting Service under which the street lighting pole/fixtures were originally installed by the Department prior to May 1, 1999. When (a) existing Mercury Vapor street lighting fixtures are converted to High Pressure Sodium Vapor fixtures or (b) existing Mercury Vapor and High Pressure Sodium Vapor street lighting pole/fixtures are replaced

357

Data:Fa8d7369-01c1-40c6-95f7-cf0f091787bc | Open Energy Information  

Open Energy Info (EERE)

Fa8d7369-01c1-40c6-95f7-cf0f091787bc Fa8d7369-01c1-40c6-95f7-cf0f091787bc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: La Plata Electric Assn, Inc Effective date: 2012/01/01 End date if known: Rate name: TOU Small Commercial Single Phase Pre-Paid Sector: Commercial Description: winter: Sept.15 - May 14(one peak:6am-11am and 5pm-10om,offpeak:11am-5pm,10pm-6am) summer: May 15 - Sept.14(onpeak:10am-10pm, offpeak:10pm-10am and weekend all) Source or reference: http://www.lpea.com/pdf/rates/2012ratesum.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months):

358

Data:B070a915-6e91-468b-9724-c483c1de7e13 | Open Energy Information  

Open Energy Info (EERE)

a915-6e91-468b-9724-c483c1de7e13 a915-6e91-468b-9724-c483c1de7e13 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeastern Rural E M C Effective date: 2004/02/27 End date if known: Rate name: SCHEDULE 50-1 ALTERNATIVE CAPACITY POWER SERVICE(Primary Service-NonCoincident Demand Charge Option) Sector: Commercial Description: Service is available to any customer of Northeastern REMC (Northeastern) whose: * Maximum demand exceeds three thousand-kilowatts (3,000 kW) for six out of any twelve consecutive months, * Average monthly load factor exceeds 65% for any 12 consecutive months, and * Enters a service agreement with Northeastern for a minimum term of 5 years. If, during the term of the service agreement, the customer is no longer able to satisfy the above qualifications, it shall receive service under Northeastern's applicable rate schedule. This schedule is not available for standby service.

359

Data:A6bd174f-b3ae-47c1-8afe-39a4acfb6613 | Open Energy Information  

Open Energy Info (EERE)

bd174f-b3ae-47c1-8afe-39a4acfb6613 bd174f-b3ae-47c1-8afe-39a4acfb6613 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Morganton, North Carolina (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: Small Commercial Service Sector: Commercial Description: 0-50kW/ Minimum Demand 30 kW Summer Demand Charge- First 30 kW: No Charge Summer Demand Charge- All kW Over 30: $10.65/kW Non-summer Demand Charge- First 30 kW: No Charge Non-summer Demand Charge- All kW Over 30: $8.52/kW Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Needs%20V2/Attachments/212/Morganton%20NC.pdf

360

Data:3f34395b-d679-4baa-814c-e4c1ae445c8c | Open Energy Information  

Open Energy Info (EERE)

b-d679-4baa-814c-e4c1ae445c8c b-d679-4baa-814c-e4c1ae445c8c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Caddo Electric Coop, Inc Effective date: 2007/05/01 End date if known: Rate name: Large Power Wholesale Plus-LP4,Primary Service Delivery Sector: Commercial Description: - Available to customers with installed capacity of 5000kW or greater of demand per month with service under term contract . - Subject to Power Factor adjustment. Source or reference: Rate binder # 4 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Data:2364aa67-a2c1-4a4a-8a36-764898e1eedd | Open Energy Information  

Open Energy Info (EERE)

aa67-a2c1-4a4a-8a36-764898e1eedd aa67-a2c1-4a4a-8a36-764898e1eedd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Gs-1 General Service Three Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

362

Data:6f3ff287-5f6b-4e34-99c1-8030e7196270 | Open Energy Information  

Open Energy Info (EERE)

7-5f6b-4e34-99c1-8030e7196270 7-5f6b-4e34-99c1-8030e7196270 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otter Tail Power Co Effective date: 2011/10/01 End date if known: Rate name: OUTDOOR LIGHTING MV-21* 400 W Sector: Lighting Description: RULES AND REGULATIONS: Terms and conditions of this electric rate schedule and the General Rules and Regulations govern use of this service. APPLICATION OF SCHEDULE: This schedule is applicable to any Customer for automatically operated dusk to dawn outdoor lighting supplied and operated by the Company.*Due to the U.S. Government Energy Act of 2005, after August 1, 2008, the Company will no longer install Mercury Vapor fixtures for new installations.

363

Data:2367240f-bd28-4b73-ae88-b8f1d7ed70c1 | Open Energy Information  

Open Energy Info (EERE)

0f-bd28-4b73-ae88-b8f1d7ed70c1 0f-bd28-4b73-ae88-b8f1d7ed70c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Austin Energy Effective date: End date if known: Rate name: General Service - Demand Commercial Sector: Commercial Description: * This rate applies to electric service required by any customer to whom no other specific rate applies and whose demand for power meets or exceeds 20 kilowatts for any month within the most recent six summer billing months or as determined by the City of Austin. Demand Adj. = Transmission Service Adj. Rider Flat rate Adj. = Fuel Adj. Factors Source or reference: http://www.austinenergy.com/About%20Us/Rates/Commercial/generalServiceDemand.htm

364

Data:Bdd26cc7-29b9-47ba-850c-1c5ed059a323 | Open Energy Information  

Open Energy Info (EERE)

Bdd26cc7-29b9-47ba-850c-1c5ed059a323 Bdd26cc7-29b9-47ba-850c-1c5ed059a323 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Idaho Power Co (Oregon) Effective date: 2010/03/01 End date if known: Rate name: 9 (Large General Service Secondary Three Phase Service) Sector: Commercial Description: This schedule is applicable to Customers whose energy usage exceeds 3,000 kWh per Billing Period for a minimum of three Billing Periods during the most recent 12 consecutive Billing Periods and whose metered Demand per billing Period has not equaled or exceeded 1,0000 kW more than twice during the most recent 12 consecutive Billing Periods.

365

Data:24f7934c-1b79-4e14-8581-94e43a17dbe3 | Open Energy Information  

Open Energy Info (EERE)

934c-1b79-4e14-8581-94e43a17dbe3 934c-1b79-4e14-8581-94e43a17dbe3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Sawnee Electric Membership Corporation Effective date: 2012/06/01 End date if known: Rate name: Outdoor Lighting Open Bottom MV 175 W Sector: Lighting Description: *Wood Poles a. Prior to construction, the requesting party will be required to pay a one-time, non-refundable, contribution-in-aid of construction (CIAC) as outlined below; i. $600 per 30 foot wood pole, ii. $625 per 35 foot wood pole, Standard Ornamental Fixtures and Standard Ornamental Poles a. Prior to construction, the requesting party will be required to pay a one-time, non-refundable, contribution-in-aid of construction (CIAC) as outlined below; i. $ 525 per 22 foot fiberglass pole; ii. $1,450 per 35 foot fiberglass pole;

366

Data:42bf6926-efb3-4d66-b8bc-3592dd6040c1 | Open Energy Information  

Open Energy Info (EERE)

926-efb3-4d66-b8bc-3592dd6040c1 926-efb3-4d66-b8bc-3592dd6040c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Rice Lake Utilities Effective date: 2011/04/01 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 7am-7pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0773 per kilowatt-hour.

367

Data:9c8f301b-3d74-4528-bfd6-1b4c1ca52cfe | Open Energy Information  

Open Energy Info (EERE)

f301b-3d74-4528-bfd6-1b4c1ca52cfe f301b-3d74-4528-bfd6-1b4c1ca52cfe No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconto Falls Water & Light Comm Effective date: 2007/10/13 End date if known: Rate name: Ms-1 Street and Yard Lighting Service - Yard Lighting 150 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0847 per kilowatt-hour.

368

Data:Bab5b9c1-455f-445c-b5e3-6350c259cfbf | Open Energy Information  

Open Energy Info (EERE)

Bab5b9c1-455f-445c-b5e3-6350c259cfbf Bab5b9c1-455f-445c-b5e3-6350c259cfbf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Mascoutah, Illinois (Utility Company) Effective date: 2011/05/01 End date if known: Rate name: Municipal Street Lighting Service- Rate 6: Sodium Vapor, 8700 Lumen, 100 watts, Class A Sector: Lighting Description: Class A: Sodium Vapor or Mercury Vapor Lamps, owned and operated by Municipality. Source or reference: Rates Binder 1, Illinois State University Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh):

369

Data:0aa4b029-c1ea-4994-818e-9d68c08967d6 | Open Energy Information  

Open Energy Info (EERE)

b029-c1ea-4994-818e-9d68c08967d6 b029-c1ea-4994-818e-9d68c08967d6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kosciusko County Rural E M C Effective date: 2011/02/01 End date if known: Rate name: Security Lights - Schedule SL (150 Watt HPS) Sector: Lighting Description: AVAILABILITY Available to any member of the Kosciusko Rural Electric Membership Corporation (KREMC) where 120 volt service exists ahead of the meter loop for the use of street lighting. CHARACTER OF SERVICE Dusk-to-dawn lighting service, using photo-electric controlled equipment, mast arm, street light type luminaire. Maintenance of the complete assembly and the cost of its electrical operation are included in this service. Any additional investment required by the extension of secondary lines or hanging of a transformer, for the sole purpose of this service, will require a contribution by the member.

370

Data:Db5e3114-b6c1-4b89-9993-586828942f1f | Open Energy Information  

Open Energy Info (EERE)

e3114-b6c1-4b89-9993-586828942f1f e3114-b6c1-4b89-9993-586828942f1f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Algoma Utility Comm Effective date: 2008/05/28 End date if known: Rate name: General Service - Optional Time-of-Day Three Phase less than 100kW 9am-9pm Sector: Industrial Description: Application: This rate schedule is optional to all Gs-1, General Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

371

Data:Ff49bf61-80dc-4b79-a5c3-b1b18323d7c1 | Open Energy Information  

Open Energy Info (EERE)

Ff49bf61-80dc-4b79-a5c3-b1b18323d7c1 Ff49bf61-80dc-4b79-a5c3-b1b18323d7c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

372

Data:29f2ff4e-9ba2-4b9d-b4eb-5165baeb01c1 | Open Energy Information  

Open Energy Info (EERE)

ff4e-9ba2-4b9d-b4eb-5165baeb01c1 ff4e-9ba2-4b9d-b4eb-5165baeb01c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bristol Virginia Utilities Effective date: 2013/08/01 End date if known: Rate name: General Power Rate - Schedule GSB(>5,000 kW and <15,000 kW) - 46kV - 161kV Sector: Industrial Description: Facility Charge - Delivery Voltage Level First 10,000 kW: 161kV = 0.00 per kW. Over 10,000 kW: 161kV = 0.00 per kW. Source or reference: http://www.bvu-optinet.com/data_elements/Electric_Rates.pdf

373

Data:2e383d6e-79d1-45c1-a2a9-d958e92a63bd | Open Energy Information  

Open Energy Info (EERE)

3d6e-79d1-45c1-a2a9-d958e92a63bd 3d6e-79d1-45c1-a2a9-d958e92a63bd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kaukauna, Wisconsin (Utility Company) Effective date: 2011/02/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service between 200kW and 5,000kW Demand 8am-8pm Transformer Ownership Discount (above 15,000 volts)with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0605 per kilowatt-hour.

374

Data:873baff3-174f-491f-a4c4-7c1d016cc484 | Open Energy Information  

Open Energy Info (EERE)

baff3-174f-491f-a4c4-7c1d016cc484 baff3-174f-491f-a4c4-7c1d016cc484 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Eastern Illinois Elec Coop Effective date: 2010/09/01 End date if known: Rate name: SINGLE-PHASE - PREPAID ADVANTAGE RATE SCHEDULE NO. 7 Sector: Commercial Description: This rate is made available in accordance with Regulation No. 29 - PREPAID ADVANTAGE and is available to member/owners for all uses, subject to established regulations of Eastern Illini Electric Cooperative, Inc. (Cooperative). Service under this schedule is available to installations requiring fifty (50) kVA or less of transformer capacity and service capacity of 200 amperes or less. This rate provides member/owners with the opportunity to have better control over their electric energy budgets and cash flow by allowing them to purchase electric energy in the amounts they need and when they want to make the purchase.

375

Data:Aa8b991f-6bb0-4125-b947-de7c1a3d7818 | Open Energy Information  

Open Energy Info (EERE)

1f-6bb0-4125-b947-de7c1a3d7818 1f-6bb0-4125-b947-de7c1a3d7818 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Flint Electric Membership Corp Effective date: 2007/04/01 End date if known: Rate name: Outdoor Lighting GUS Ornamental/ Post Top MV 175 W Sector: Lighting Description: No Longer Available. POLE CHARGES Type, Charge 30' Wood $205.00 35' Wood $220.00 16' Aluminum (Brushed) $250.00 16' Fiberglass (Black) $300.00 16' Fiberglass (Acorn, Black) $800.00 30' Steel & Sub Base $1325.00 30' Fiberglass with 6' Arm $625.00 30' Fiberglass with 2 - 6' Arm $725.00 Source or reference: http://www.flintenergies.com/myHome/residentialRates/covenantStreetLighting.aspx

376

Data:9880f1a9-479b-4cec-bf30-0623b23772c1 | Open Energy Information  

Open Energy Info (EERE)

f1a9-479b-4cec-bf30-0623b23772c1 f1a9-479b-4cec-bf30-0623b23772c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Upper Peninsula Power Co Effective date: 2012/01/01 End date if known: Rate name: Naturewise Sector: Description: Available to customers taking service from the Company under the eligible rate schedules listed in the source document that desire to purchase energy generated by renewable resources. The Company will initially begin billing customers that sign up for this service upon the Company having secured adequate renewable generation supply and completed necessary billing system modifications. The Company has the right to limit the energy sold under this tariff to 75,000 Renewable Energy Blocks per month and to limit the energy sold to each customer to 25,000 Renewable Energy Blocks per month. Charge is per 100 kWh renewable energy block.

377

Data:81cd493b-3a37-49fb-88c1-8bf6f633bcaf | Open Energy Information  

Open Energy Info (EERE)

93b-3a37-49fb-88c1-8bf6f633bcaf 93b-3a37-49fb-88c1-8bf6f633bcaf No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New Hampshire Elec Coop Inc Effective date: 2013/05/01 End date if known: Rate name: LGT02-189 Sector: Lighting Description: Incandescent: only available at existing locations with existing fixtures Source or reference: http://www.nhec.com/filerepository/rate_change_sheets_for_2013_may01_final.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

378

Data:Abe526c1-9c10-4b5c-a982-dbd652ca6b20 | Open Energy Information  

Open Energy Info (EERE)

Abe526c1-9c10-4b5c-a982-dbd652ca6b20 Abe526c1-9c10-4b5c-a982-dbd652ca6b20 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Halifax Electric Member Corp Effective date: 2012/10/01 End date if known: Rate name: RESIDENTIAL SERVICE Sector: Residential Description: AVAILABILITY: This Schedule is available in all territory served by the Cooperative, subject to its established Service Rules and Regulations. APPLICABILITY: This Schedule is applicable when electric service is used for domestic purposes in and about a residential dwelling unit. Service under this Schedule is not applicable for farm operations such as crop dryers or tobacco barns, or for other commercial purposes. However, where this type of service is in combination with residential service and the total demand of the nonresidential usage is not greater than the total demand of the residential service requirements, the consumer may be served under this Schedule. If the predominant demand is nonresidential in nature, the Member must be served under a General Service schedule or the residential and nonresidential loads will be metered separately and billed under the appropriate schedule for each service. Service shall be provided at one location through one meter.

379

Data:F6f7e8d2-efb5-4b3c-8754-618c1efcee15 | Open Energy Information  

Open Energy Info (EERE)

e8d2-efb5-4b3c-8754-618c1efcee15 e8d2-efb5-4b3c-8754-618c1efcee15 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Midwest Energy Inc Effective date: 2012/06/29 End date if known: Rate name: LAL- HPS 70 Watt 29 kWh (Wood Pole)- Metered Sector: Lighting Description: Source or reference: http://www.mwenergy.com/elecrate.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

380

Data:Dfc07d94-4ec5-413b-840b-b3b55997c1cc | Open Energy Information  

Open Energy Info (EERE)

7d94-4ec5-413b-840b-b3b55997c1cc 7d94-4ec5-413b-840b-b3b55997c1cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bartholomew County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Outdoor Security Lighting Service, Mercury Vapor Flood Light, 400W (New Wood Pole) Sector: Lighting Description: Availability Available to any consumer of the Corporation where 120-volt service exists ahead of the meter loop for the use of Security Lighting, subject to the Corporation's Service Rules and Regulations. Customers receiving OSL service using a wood pole owned by the customer prior to May 1, 2000 or owned by the Corporation but required for a use other than OSL service shall receive service under the existing wood pole rate. All other customers shall receive service under the new wood pole rate.

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Data:5c1d9c79-53c2-46a3-930b-aab27e54edfb | Open Energy Information  

Open Energy Info (EERE)

c1d9c79-53c2-46a3-930b-aab27e54edfb c1d9c79-53c2-46a3-930b-aab27e54edfb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Intermountain Rural Elec Assn Effective date: 2013/02/01 End date if known: Rate name: Residential Time of Use Demand Metered (C-TOU) Sector: Residential Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous

382

Data:A4140687-d4a7-49dd-a606-94e4a53117c1 | Open Energy Information  

Open Energy Info (EERE)

40687-d4a7-49dd-a606-94e4a53117c1 40687-d4a7-49dd-a606-94e4a53117c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule BP Bulk Power Industrial, Demand Metered 7,000 kW and Over, Time-Of-Use Sector: Industrial Description: Applicability This schedule applies to: 1) commercial and industrial customers for general power use with a demand of 7,000 kW and over, and 2) services where other Rate Schedules (other than Rate Schedules NM and SG) do not apply. This schedule is applicable on an annual basis only. Power Factor Charge, per kVAr $ 1.10

383

Data:8100a82f-3ccb-4ce5-b6dc-12a267a595c1 | Open Energy Information  

Open Energy Info (EERE)

0a82f-3ccb-4ce5-b6dc-12a267a595c1 0a82f-3ccb-4ce5-b6dc-12a267a595c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Wahoo, Nebraska (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Industrial Large General Service (Three Phase) Sector: Industrial Description: Source or reference: http://www.wahoo.ne.us/content_subcat.asp?SubCategoryID=88&CategoryID=125&ContentID=68 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V):

384

Data:F6ccb605-3162-48c1-af09-08b1b8edaf5a | Open Energy Information  

Open Energy Info (EERE)

ccb605-3162-48c1-af09-08b1b8edaf5a ccb605-3162-48c1-af09-08b1b8edaf5a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Richland Center, Wisconsin (Utility Company) Effective date: 2007/07/09 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0582 per kilowatt-hour.

385

Data:1ed501ce-56c1-4b71-8e34-eed46b0e120d | Open Energy Information  

Open Energy Info (EERE)

ce-56c1-4b71-8e34-eed46b0e120d ce-56c1-4b71-8e34-eed46b0e120d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2011/01/01 End date if known: Rate name: Schedule LC Street Lighting - Customer Owned-700 watt mercury vapor lamp Sector: Lighting Description: Applicability This schedule is applicable to lighting service for the illumination of public streets, alleys, highways and other publicly-dedicated outdoor places and is available to cities, counties, lighting districts or other public bodies where the District supplies electrical energy only, and the customer furnishes, installs, owns, operates and completely maintains lighting units including switching and all other associated equipment. Monthly Usage: 266kWh

386

Data:92ee26fc-d331-4464-96c1-685f8877985b | Open Energy Information  

Open Energy Info (EERE)

fc-d331-4464-96c1-685f8877985b fc-d331-4464-96c1-685f8877985b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Marshfield, Wisconsin (Utility Company) Effective date: 2012/02/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service between 50kW and 200kW Demand Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0515 per kilowatt-hour.

387

Data:Ec220dff-40c1-4a0f-a2d3-5933ad7481b0 | Open Energy Information  

Open Energy Info (EERE)

40c1-4a0f-a2d3-5933ad7481b0 40c1-4a0f-a2d3-5933ad7481b0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Flint Electric Membership Corp Effective date: 2007/04/01 End date if known: Rate name: Outdoor Lighting NGOS Directional Flood MV 1000 W Sector: Lighting Description: No longer available. If on a leased pole, add a $3.10 monthly charge. POLE CHARGES Type, Charge 30' Wood $205.00 35' Wood $220.00 16' Aluminum (Brushed) $250.00 16' Fiberglass (Black) $300.00 16' Fiberglass (Acorn, Black) $800.00 30' Steel & Sub Base $1325.00 30' Fiberglass with 6' Arm $625.00 30' Fiberglass with 2 - 6' Arm $725.00

388

Data:2f1b7d71-70da-4518-99b6-a9515606c1c5 | Open Energy Information  

Open Energy Info (EERE)

d71-70da-4518-99b6-a9515606c1c5 d71-70da-4518-99b6-a9515606c1c5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Kiel, Wisconsin (Utility Company) Effective date: 2011/05/06 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 9am-9pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0754 per kilowatt-hour.

389

Data:94b1ab18-6c1b-4464-95dd-208c5aa8fe9d | Open Energy Information  

Open Energy Info (EERE)

b1ab18-6c1b-4464-95dd-208c5aa8fe9d b1ab18-6c1b-4464-95dd-208c5aa8fe9d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kosciusko County Rural E M C Effective date: 2010/10/01 End date if known: Rate name: Green Power-Schedule GP(OPTION A) Sector: Residential Description: AVAILABILITY This rider is available to consumers taking service concurrently under Schedule RF, Residential and Farm Service and Schedule C, Commercial Service. This rate is for the purchase of energy from renewable energy sources (predominantly landfill methane gas generation) and the support of qualified environmental organizations. Consumers requesting service under this optional rider must remain on the rider for a minimum of twelve months. Kosciusko Rural Electric Membership Corporation (KREMC) reserves the right to limit the number of participants under this rider when its total renewable sources have been sold or reserved.

390

Data:E213c1b3-bb48-4a8c-8414-652c81a37048 | Open Energy Information  

Open Energy Info (EERE)

3c1b3-bb48-4a8c-8414-652c81a37048 3c1b3-bb48-4a8c-8414-652c81a37048 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Norris Public Power District Effective date: 2012/01/20 End date if known: Rate name: Schedule 18: Sales for Resale - Gen Station Sector: Commercial Description: Available to a municipality for resale which has exercised its right to purchase WAPA Class I Firm Power directly from WAPA. The summer rates will apply to customer bills rendered between June 15th and October 15th. The winter rates will apply to the remaining months of the year. Source or reference: http://www.norrisppd.com/downloads/Schedule%2018%20-%20Sales%20for%20Resale%20-%20Gen%20Station.pdf

391

Data:Ddf73203-7579-48e6-acfd-bb93c1ded41e | Open Energy Information  

Open Energy Info (EERE)

Ddf73203-7579-48e6-acfd-bb93c1ded41e Ddf73203-7579-48e6-acfd-bb93c1ded41e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Columbus, Wisconsin (Utility Company) Effective date: 2006/02/01 End date if known: Rate name: Ms-1 Street Lighting Service 50 W LED Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kWh of sales) is greater or lesser than the base cost of power purchased (per kWh of sales). The base cost of power is $0.0549 per kWh. See schedule PCAC.

392

Data:7fba2972-23c1-4a76-befd-da3a23ab854b | Open Energy Information  

Open Energy Info (EERE)

972-23c1-4a76-befd-da3a23ab854b 972-23c1-4a76-befd-da3a23ab854b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: New York State Elec & Gas Corp Effective date: 2011/09/01 End date if known: Rate name: SERVICE CLASSIFICATION NO. 5 Outdoor Lighting Service - ESS Flood Lights Metal Halide 400W Sector: Lighting Description: APPLICABLE TO THE USE OF SERVICE FOR: Outdoor lighting for residential and general service customers where applicable electric service is available. Flat rate Adjustments = Transition Charge. Source or reference: http://www.nyseg.com/MediaLibrary/2/5/Content%20Management/NYSEG/SuppliersPartners/PDFs%20and%20Docs/PSC120ServiceClassification_5.pdf

393

Data:Dffacf2a-b9c1-4f34-a81c-01ecd91e3fe7 | Open Energy Information  

Open Energy Info (EERE)

Dffacf2a-b9c1-4f34-a81c-01ecd91e3fe7 Dffacf2a-b9c1-4f34-a81c-01ecd91e3fe7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Frankfort, Indiana (Utility Company) Effective date: 1997/10/27 End date if known: Rate name: SL Public Street Lighting Overhead 100 watt Sodium Vapor metal pole Sector: Lighting Description: Availability. Available for street lighting within the corporate limits of the city and highway lighting within the area served by the utility's distribution system. Character of service. Standard street lighting service using lamps available under this schedule. Source or reference: http://www.amlegal.com/nxt/gateway.dll/Indiana/frankfort_in/cityoffrankfortindianacodeofordinances?f=templates$fn=default.htm$3.0$vid=amlegal:frankfort_in

394

Data:D376c1c7-2db7-45c8-990c-8853020b62ca | Open Energy Information  

Open Energy Info (EERE)

6c1c7-2db7-45c8-990c-8853020b62ca 6c1c7-2db7-45c8-990c-8853020b62ca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Provo City Corp (Utility Company) Effective date: 2012/06/01 End date if known: Rate name: Private Outdoor Security (Closed Rate) - 175 W MV - Steel Pole Sector: Lighting Description: Source or reference: http://www.provo.org/util.rates_summary.html Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

395

Data:5227a02b-2e59-4b6a-8c1f-342ce7552e3b | Open Energy Information  

Open Energy Info (EERE)

a02b-2e59-4b6a-8c1f-342ce7552e3b a02b-2e59-4b6a-8c1f-342ce7552e3b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Spring Grove, Minnesota (Utility Company) Effective date: 2012/06/05 End date if known: Rate name: Large Commercial Sector: Commercial Description: Reactive charge $0.27/rkVa Source or reference: http://www.springgrove.govoffice.com/vertical/sites/%7BF9DAB398-3ED2-4F76-ADAA-FADAB2BA2D32%7D/uploads/Chapter_105_-_Electric_Rates_2012.xlsx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

396

Data:6ccf23c1-5bb1-4559-a0d9-628a05b7fe98 | Open Energy Information  

Open Energy Info (EERE)

ccf23c1-5bb1-4559-a0d9-628a05b7fe98 ccf23c1-5bb1-4559-a0d9-628a05b7fe98 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Upper Peninsula Power Co Effective date: 2012/01/01 End date if known: Rate name: Real-Time Market Pricing RTMP Sector: Description: Any customer interconnected directly with the American Transmission Company (ATC) with a demand in excess of 1,000 KW. Source or reference: http://www.uppco.com/company/tariffs/UD2D47.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage

397

Data:81f783c1-459b-4274-bae0-208ef91e703f | Open Energy Information  

Open Energy Info (EERE)

3c1-459b-4274-bae0-208ef91e703f 3c1-459b-4274-bae0-208ef91e703f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oncor Electric Delivery Company LLC Effective date: 2012/01/01 End date if known: Rate name: Secondary Service Less Than or Equal to 10 kW Sector: Commercial Description: This schedule is applicable to Delivery Service for non-residential purposes at secondary voltage with demand less than or equal to 10 kW when such Delivery Service is to one Point of Delivery and measured through one Meter and is not for shared or resale purposes. Delivery Service will be single-phase, 60 hertz, at a standard secondary voltage. Delivery Service will be metered using Company's standard watt-hour meter provided for this type of Delivery Service, unless Retail Customer is eligible for and chooses a competitive meter provider. Any meter other than the standard meter provided by Company will be provided at an additional charge. Where Delivery Service of the type desired is not available at the Point of Delivery, additional charges and special contract arrangements may be required prior to Delivery Service being furnished, pursuant to Section 6.1.2.2 of this Tariff.

398

Data:870319f6-6e0a-4a4d-a238-353c1e51b14a | Open Energy Information  

Open Energy Info (EERE)

319f6-6e0a-4a4d-a238-353c1e51b14a 319f6-6e0a-4a4d-a238-353c1e51b14a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Farmville, North Carolina (Utility Company) Effective date: 2010/07/01 End date if known: Rate name: Seasonal Service- 3-Phase Sector: Commercial Description: Demand charge initiates over 15 kW. Source or reference: Rates Binder A Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

399

Data:44a6871e-c1a3-4202-b482-d28e8c8d8f2a | Open Energy Information  

Open Energy Info (EERE)

1e-c1a3-4202-b482-d28e8c8d8f2a 1e-c1a3-4202-b482-d28e8c8d8f2a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Menasha, Wisconsin (Utility Company) Effective date: 2011/04/06 End date if known: Rate name: Cp-1 Small Power Service between 50kW and 200kW Demand Sector: Industrial Description: This rate will be applied to customers for all types of service if their monthly Maximum Measured Demand is in excess of 50 kilowatts (kW) per month for three or more months in a consecutive 12-month period, unless the customer exceeds the application conditions of the large power time-of-day schedule.

400

Data:440b7c1e-e7b1-4710-a83c-9463d5508ac9 | Open Energy Information  

Open Energy Info (EERE)

b7c1e-e7b1-4710-a83c-9463d5508ac9 b7c1e-e7b1-4710-a83c-9463d5508ac9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Elec & Gas Co Effective date: 2010/06/07 End date if known: Rate name: 250 COBRA-HEAD VANDELL RESISTANT SHIELD Sector: Lighting Description: Source or reference: http://www.pseg.com/family/pseandg/tariffs/electric/pdf/electric_tariff.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category:

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Data:3c67a7c1-9c44-435c-9c3c-70daeb652095 | Open Energy Information  

Open Energy Info (EERE)

7a7c1-9c44-435c-9c3c-70daeb652095 7a7c1-9c44-435c-9c3c-70daeb652095 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cumberland, Wisconsin (Utility Company) Effective date: 2006/03/15 End date if known: Rate name: Cp-2 Large Power Service above 200kW Demand transformer Ownership Discount with Parallel Generation(20 kW or less)-Net Energy Billing Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0294per kilowatt-hour.

402

Data:5464c80f-58c2-4261-b370-a76d25c1b1e9 | Open Energy Information  

Open Energy Info (EERE)

0f-58c2-4261-b370-a76d25c1b1e9 0f-58c2-4261-b370-a76d25c1b1e9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pontotoc Electric Power Assn Effective date: 2013/07/01 End date if known: Rate name: Street Light HPS 400 W 30' pole Sector: Lighting Description: Source or reference: http://www.sitemason.com/files/fjDo1q/May%202012.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

403

Data:Fe089548-e9ea-4c1c-beb5-c75ba3b70d70 | Open Energy Information  

Open Energy Info (EERE)

Fe089548-e9ea-4c1c-beb5-c75ba3b70d70 Fe089548-e9ea-4c1c-beb5-c75ba3b70d70 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Central Maine Power Co Effective date: 2012/07/01 End date if known: Rate name: AL Discontinued Lighting-Other Lighting Edison Enclosed H. P. Sodium 50 watts Sector: Lighting Description: This rate is available for area lighting service furnished on a dusk-to-dawn basis. The Company will furnish, install and maintain area lights in new locations as may be requested in writing for area lighting service, subject to the TERM OF SERVICE specified below. TERM OF SERVICE The term of service under this schedule shall be by service agreement for a period of fifteen (15) years and on a continuing basis thereafter. Requests for additions, changes or removals for area lighting service may require 90 days' advance written notice.

404

Data:514fdf20-e298-4b9e-877b-7d4d7c1d364b | Open Energy Information  

Open Energy Info (EERE)

fdf20-e298-4b9e-877b-7d4d7c1d364b fdf20-e298-4b9e-877b-7d4d7c1d364b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Richmond, Wisconsin (Utility Company) Effective date: 2010/02/01 End date if known: Rate name: Cp-2 Large Power Time-of-Day Service Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0710 per kilowatt-hour.

405

Data:4062a6cc-f3c1-49f1-a4a2-df0485f343f7 | Open Energy Information  

Open Energy Info (EERE)

a6cc-f3c1-49f1-a4a2-df0485f343f7 a6cc-f3c1-49f1-a4a2-df0485f343f7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Turlock Irrigation District Effective date: 2009/02/01 End date if known: Rate name: Schedule LD Street Lighting - District Owned-175 watt mercury vapor lamp Sector: Lighting Description: Applicability This schedule is applicable to lighting service for the illumination of public streets, alleys, highways and other publicly-dedicated outdoor places where Schedule LC does not apply and is available to cities, counties, lighting districts or other public bodies where the District furnishes, installs, owns, operates and maintains the complete lighting installation. Monthly Usage: 70kWh

406

Data:3a862c16-7692-4d5b-8a4d-c1bc37087c9e | Open Energy Information  

Open Energy Info (EERE)

6-7692-4d5b-8a4d-c1bc37087c9e 6-7692-4d5b-8a4d-c1bc37087c9e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Carroll County REMC Effective date: 2012/04/01 End date if known: Rate name: GENERAL SERVICE DEMAND - STANDARD SERVICE RATE SCHEDULE Sector: Commercial Description: Facilities Charge - $48.00 Demand Charge - All kW of billing demand per month @ $6.61 per kW Energy Charge - All kWh $0.0682 per kWh Source or reference: http://www.cwremc.com/index.php?option=com_content&view=article&id=139&Itemid=86 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW):

407

Data:588842fb-8872-4812-b6cc-93c1d04a2f6f | Open Energy Information  

Open Energy Info (EERE)

8872-4812-b6cc-93c1d04a2f6f 8872-4812-b6cc-93c1d04a2f6f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Blue Grass Energy Coop Corp Effective date: 2011/06/01 End date if known: Rate name: Schedule G1- Large industrial Sector: Industrial Description: Applicable to contracts with demand of 15,000 kW and greater with a monthly energy usage .equal to or greater than 438 k'wln per kW of contract demand. Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Rates%20Collected/Attachments/125/1%20COOP,%20KY,%20Blue%20Grass%20Energy%20Tariff-2.pdf

408

Data:608c1f9c-4718-44a3-bd23-2232f29ecaca | Open Energy Information  

Open Energy Info (EERE)

c1f9c-4718-44a3-bd23-2232f29ecaca c1f9c-4718-44a3-bd23-2232f29ecaca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconto Falls Water & Light Comm Effective date: 2007/10/13 End date if known: Rate name: Ms-1 Street and Yard Lighting Service Overhead 250 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0847 per kilowatt-hour.

409

Data:D0a0d550-4e4c-463b-9163-5fef661cd2c1 | Open Energy Information  

Open Energy Info (EERE)

a0d550-4e4c-463b-9163-5fef661cd2c1 a0d550-4e4c-463b-9163-5fef661cd2c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Santee Electric Coop, Inc Effective date: 2010/11/01 End date if known: Rate name: Area Lighting Service 250w HPS Enclosed Sector: Lighting Description: This Schedule is available for the leasing of mercury vapor; metal halide and sodium vapor outdoor lighting units to any member/owner served by the Cooperative and subject to established Service Rules and Regulations. Extra charges - Dedicated Poles 30' Wood $2.00 35' Wood $4.00 40' Wood $5.00 45' Wood $6.00 30' to 45' Fiberglass or Metal Pole $16.17

410

Data:D1bda19a-99df-4de6-ab1a-b1c300c1acb2 | Open Energy Information  

Open Energy Info (EERE)

bda19a-99df-4de6-ab1a-b1c300c1acb2 bda19a-99df-4de6-ab1a-b1c300c1acb2 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Menasha, Wisconsin (Utility Company) Effective date: 2011/04/06 End date if known: Rate name: Cp-4 Large Industrial Power Time-of-Day Transformer Ownership Discount Sector: Industrial Description: This rate will be applied to customers for all types of service, if their monthly Maximum Measured Demand is in excess of 5,000 kW per month for three or more months in a consecutive 12-month period and their calculated Load Factor is greater than or equal to 85 percent.

411

Data:Fc410ce3-8c1c-4303-a3a9-779c632ca1f4 | Open Energy Information  

Open Energy Info (EERE)

Fc410ce3-8c1c-4303-a3a9-779c632ca1f4 Fc410ce3-8c1c-4303-a3a9-779c632ca1f4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Minnesota Power Inc Effective date: 2011/03/23 End date if known: Rate name: RIDER FOR CITY OF STAPLES FRANCHISE FEE Sector: Description: APPLICATION Applicable to bills for retail electric service within the corporate limits of the City of Staples. ADJUSTMENT There shall be added to each customer's monthly electric service bill a City of Staples Franchise Fee assessment. The amount of the fee to be assessed shall be the assessment rate equal to that imposed on Minnesota Power by the City of Staples, which is currently 5% of the total bill excluding sales taxes. The fee is listed on the bill as "Staples Franchise Fee (5%)" and is effective as of March 11, 2010. 100% of the City of Staples Franchise Fee assessment collected will be passed along to the City of Staples.

412

Data:23bc19a5-a508-4ca0-b7da-2d3c1db7db71 | Open Energy Information  

Open Energy Info (EERE)

9a5-a508-4ca0-b7da-2d3c1db7db71 9a5-a508-4ca0-b7da-2d3c1db7db71 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Belmont, Wisconsin (Utility Company) Effective date: 2005/01/21 End date if known: Rate name: Cp-1 Small Power Service Sector: Commercial Description: This rate will be applied to customers for all types of service if their monthly Maximum Measured Demand is in excess of 30 kilowatts per month but not to exceed 250kW for three or more months in a consecutive 12-month period, unless the customer exceeds the application conditions of the large Power time-of-Day schedule.

413

Data:7d52316f-933c-4569-8e0e-024e27e25c1b | Open Energy Information  

Open Energy Info (EERE)

316f-933c-4569-8e0e-024e27e25c1b 316f-933c-4569-8e0e-024e27e25c1b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Decatur County Rural E M C Effective date: 2010/04/01 End date if known: Rate name: LARGE POWER ELECTRIC SERVICE Sector: Industrial Description: Three phase, 60 hertz, at standard voltages; where service is supplied three phase, transformation will be approximately 240 or 480 volts three wire delta, 240/480 volts or 120/240 volts four wire delta, or 208Y/ 120 or 480Y/ 277 volts four wire wye. Should Customer require a non-standard voltage, Customer will, at his own expense, furnish and maintain all transformers and protective equipment therefore necessary in order to obtain such non-standard voltage.

414

Data:Eabd2142-fc95-40fa-b50c-1ac0c9a2d12a | Open Energy Information  

Open Energy Info (EERE)

Eabd2142-fc95-40fa-b50c-1ac0c9a2d12a Eabd2142-fc95-40fa-b50c-1ac0c9a2d12a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: Intersection flasher light-Within Corporate Limits Sector: Lighting Description: For the purpose of paying the expenses of conducting and managing the Electric Division, Utilities Department, of the City, the City Manager is hereby authorized and directed to charge the following rates, for all utility bills issued on and after the dates indicated below. These rates are applicable to service calls, unmetered services, standby power and miscellaneous installations which do not fall under the normal rate schedules, which rates are hereby adopted for all utility bills issued on and after July 1, 1990

415

Data:B351f459-50f0-4e88-93c1-a871487549a7 | Open Energy Information  

Open Energy Info (EERE)

f459-50f0-4e88-93c1-a871487549a7 f459-50f0-4e88-93c1-a871487549a7 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northeastern Rural E M C Effective date: 2004/02/27 End date if known: Rate name: SCHEDULE 50-1 ALTERNATIVE CAPACITY POWER SERVICE(Secondary Voltage-Coincident Demand Charge Option) Sector: Commercial Description: Service is available to any customer of Northeastern REMC (Northeastern) whose: * Maximum demand exceeds three thousand-kilowatts (3,000 kW) for six out of any twelve consecutive months, * Average monthly load factor exceeds 65% for any 12 consecutive months, and * Enters a service agreement with Northeastern for a minimum term of 5 years. If, during the term of the service agreement, the customer is no longer able to satisfy the above qualifications, it shall receive service under Northeastern's applicable rate schedule. This schedule is not available for standby service.

416

Data:5ff6f4f0-b96e-4eb3-b960-38c1af272ab1 | Open Energy Information  

Open Energy Info (EERE)

ff6f4f0-b96e-4eb3-b960-38c1af272ab1 ff6f4f0-b96e-4eb3-b960-38c1af272ab1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Stratford, Wisconsin (Utility Company) Effective date: 2008/11/18 End date if known: Rate name: Residential- Three- Phase- Time-of-Day- Peak: 9am-9pm Sector: Residential Description: This rate schedule is optional to all Rg-1, Residential Service customers. Customers that wish to be served on this rate schedule must apply to the utility for service. Once an optional customer begins service on this rate schedule, the customer shall remain on the rate for a minimum of one year. Any customer choosing to be served on this rate schedule waives all rights to billing adjustments arising from a claim that the bill for service would be less on another rate schedule than under this rate schedule.

417

Data:Ef5c484f-c497-40f1-bcfe-3c1d813f460a | Open Energy Information  

Open Energy Info (EERE)

4f-c497-40f1-bcfe-3c1d813f460a 4f-c497-40f1-bcfe-3c1d813f460a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Painesville, Ohio (Utility Company) Effective date: 1990/07/01 End date if known: Rate name: Area Lighting-Mercury vapor-Decorative-1,000 watts-Within Corporate Limits Sector: Lighting Description: For the purpose of paying the expenses of conducting and managing the Electric Division, Utilities Department of the City, the City Manager is hereby authorized and directed to charge the following rates for furnishing electric current for outdoor lights, which rates are hereby adopted, for all utility bills issued on and after July 1, 1990

418

Data:31c724fa-4487-48c1-b494-adb3b400d070 | Open Energy Information  

Open Energy Info (EERE)

24fa-4487-48c1-b494-adb3b400d070 24fa-4487-48c1-b494-adb3b400d070 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cuba City, Wisconsin (Utility Company) Effective date: 2009/10/14 End date if known: Rate name: Ms-1 Street Lighting Service 100 W HPS Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0765 per kilowatt-hour.

419

Data:C9009be0-e87d-40c0-9a39-c1fe4c35625a | Open Energy Information  

Open Energy Info (EERE)

be0-e87d-40c0-9a39-c1fe4c35625a be0-e87d-40c0-9a39-c1fe4c35625a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 3 of Mason County Effective date: 2012/05/01 End date if known: Rate name: OH 100 Watt HPS (8,500 Lumen) Lamp Sector: Lighting Description: Source or reference: http://www.masonpud3.org/rates/outdoorLights.aspx Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

420

Data:F84850bf-598a-4d05-bf8c-1fe55cf813df | Open Energy Information  

Open Energy Info (EERE)

bf-598a-4d05-bf8c-1fe55cf813df bf-598a-4d05-bf8c-1fe55cf813df No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Cimarron Electric Coop Effective date: 2002/02/01 End date if known: Rate name: Experimental Residential Demand Rate (System Demand Charge) Sector: Residential Description: AVAILABILITY: to farm and residential Consumers for uses subject to the established rules and regulations of the Cooperative. Service under this tariff shall be at the option of both the Consumer and the Cooperative. During which time this rate is experimental, the consumer will be billed using normal rates as well as the experimental demand rate. The consumer will have the option of paying the lesser of the two. (Peak Demand Charge and System Demand Charge)

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Data:42b77f49-c689-4baf-94c8-fd4bf6c1b030 | Open Energy Information  

Open Energy Info (EERE)

f49-c689-4baf-94c8-fd4bf6c1b030 f49-c689-4baf-94c8-fd4bf6c1b030 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Public Street Lighting Service - HPSV Double Lamp Fixtures - Ornamental Metal Pole Sector: Lighting Description: To the City of Independence for all Public Street Lighting Service under which the street lighting pole/fixtures were originally installed by the Department prior to May 1, 1999. When (a) existing Mercury Vapor street lighting fixtures are converted to High Pressure Sodium Vapor fixtures or (b) existing Mercury Vapor and High Pressure Sodium Vapor street lighting pole/fixtures are replaced

422

Data:B99f3719-b97c-4b31-a118-4efe4678c1cc | Open Energy Information  

Open Energy Info (EERE)

19-b97c-4b31-a118-4efe4678c1cc 19-b97c-4b31-a118-4efe4678c1cc No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Reedsburg Utility Comm Effective date: 2011/06/01 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0785 per kilowatt-hour.

423

Data:3ad86ced-ef34-4972-be5d-4d2c1ee0d985 | Open Energy Information  

Open Energy Info (EERE)

ad86ced-ef34-4972-be5d-4d2c1ee0d985 ad86ced-ef34-4972-be5d-4d2c1ee0d985 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lincoln County Power Dist No 1 Effective date: 2009/07/01 End date if known: Rate name: RESIDENTIAL SERVICE - RURAL Sector: Residential Description: Applicable to all domestic residences receiving service from the Lincoln County Power District No. 1's facilities, and which are located within the Rural System. Service shall be subject to the established rules and regulations of the Lincoln County Power District No. 1. Service shall be provided as single-phase, 60 hertz, and at the available secondary voltage. The number of structures served by one meter for Residential service shall not exceed two (2) and only one (1) shall be a residence. A culinary water well shall be considered a structure for purposes of this rate schedule. The Customer shall not use the electric service hereunder as an auxiliary or supplement to any other source and shall not sell the electric power and energy purchased hereunder.

424

Data:46162d74-c1d2-4c45-9628-837a8408afd1 | Open Energy Information  

Open Energy Info (EERE)

d74-c1d2-4c45-9628-837a8408afd1 d74-c1d2-4c45-9628-837a8408afd1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tillamook Peoples Utility Dist Effective date: 2001/11/01 End date if known: Rate name: LARGE POWER SERVICE - Schedule LP-3 - Secondary Sector: Industrial Description: This schedule applies to all large power customers where actual demand has exceeded one thousand kilowatts three times or more within the preceding twelve months or where installed capacity serving a customer at a single, contiguous site is 2500 kilovolt-amperes (KVA) or greater. Heavy Load Period Demand Charges: The maximum billing occurring during the hours of 7 a.m. through 12 noon, Monday through Saturday, after adjustment for power factor.

425

Data:03872738-aa59-4d64-9659-c3c62d3414c1 | Open Energy Information  

Open Energy Info (EERE)

738-aa59-4d64-9659-c3c62d3414c1 738-aa59-4d64-9659-c3c62d3414c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Pardeeville, Wisconsin (Utility Company) Effective date: 2007/10/10 End date if known: Rate name: Ms-1 Street Lighting Service Overhead 175 W MV Supply and Maintenance Discount Sector: Lighting Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0680 per kilowatt-hour.

426

Data:A9a4189c-1a08-4cac-82eb-2e4f4242a6b6 | Open Energy Information  

Open Energy Info (EERE)

a4189c-1a08-4cac-82eb-2e4f4242a6b6 a4189c-1a08-4cac-82eb-2e4f4242a6b6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Moon Lake Electric Assn Inc Effective date: 2000/07/01 End date if known: Rate name: SCHEDULE I - IRRIGATION Sector: Commercial Description: AVAILABILITY: This schedule is for alternating current, at the Association's available voltage through a single point of delivery used exclusively for pumping water for agricultural purposes for either irrigation or soil drainage located on or near Association's facilities of adequate capacity. Subject to the established rules and regulations of the Association. Limited to pumps of 5 H.P. or more. This rate not for resale.

427

Data:632c1b2a-49c4-48cc-bbbf-ef05c119725f | Open Energy Information  

Open Energy Info (EERE)

c1b2a-49c4-48cc-bbbf-ef05c119725f c1b2a-49c4-48cc-bbbf-ef05c119725f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Independence, Missouri (Utility Company) Effective date: 2013/07/01 End date if known: Rate name: Public Street Lighting Service - HPSV Double Mastarm Lamp Fixtures - Breakaway Base Standard Steel/Concrete Pole - Company Owned Sector: Lighting Description: To the City of Independence for all Public Street Lighting Service under which the street lighting pole/fixtures were originally installed by the Department prior to May 1, 1999. When (a) existing Mercury Vapor street lighting fixtures are converted to High Pressure Sodium Vapor fixtures or (b) existing Mercury Vapor and High Pressure Sodium Vapor street lighting pole/fixtures are replaced

428

Data:3a3862c1-91e7-4b1c-9ad7-657897044c96 | Open Energy Information  

Open Energy Info (EERE)

2c1-91e7-4b1c-9ad7-657897044c96 2c1-91e7-4b1c-9ad7-657897044c96 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Elkhorn Rural Public Pwr Dist Effective date: 2011/01/01 End date if known: Rate name: RATE 93,95 Hadar Commercial-Single Phase Sector: Commercial Description: AVAILABLE: Service area of Hadar, Nebraska. APPLICABLE: To customers for lighting, heating, and power purposes where all service is taken through a single meter at one location. Rating of individual single-phase motors and other single-phase power and heating units served under this schedule shall not exceed ten (10) horsepower except by special permission. CHARACTER OF SERVICE: 60 cycle, A.C., 120 volts or 120/240 volts, single phase, three and four wire or at any of the District's standard distribution voltages as available. Customers requiring service at secondary voltages other than that already established by the District shall be required to provide suitable space on his premises for location of the District's transformation and associated equipment. Secondary voltage other than that already established shall be provided by special permission only.

429

Data:67e2d839-601a-4a02-bfbe-2ccb5c1f3096 | Open Energy Information  

Open Energy Info (EERE)

d839-601a-4a02-bfbe-2ccb5c1f3096 d839-601a-4a02-bfbe-2ccb5c1f3096 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Texas-New Mexico Power Co Effective date: 2009/09/01 End date if known: Rate name: Roadway Lighting Service - (overhead service), Schedule I -Wood Pole - 250W, HPS (Closed) Sector: Lighting Description: The service provided pursuant to this Tariff is for any end-use customer for roadway lighting service where existing facilities have adequate capacity and suitable voltage. Unmetered, automatically controlled, overhead lighting service operating from dusk to dawn. The Company will install, operate and maintain such lighting. Lights will be mounted on an existing service pole or poles and such service will be limited to 120 volt service.

430

Data:7f950269-4c7e-4ce5-aa29-238a6f0c1e4b | Open Energy Information  

Open Energy Info (EERE)

0269-4c7e-4ce5-aa29-238a6f0c1e4b 0269-4c7e-4ce5-aa29-238a6f0c1e4b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of St Marys, Ohio (Utility Company) Effective date: 2001/06/10 End date if known: Rate name: Commercial General Service Rate 127 Sector: Commercial Description: *Available to all customers within and outside the corporate limits of the City of St. Marys for lighting, heating, cooking and power. Character of service:120/240, 120/208, 208, 240, 480 Volt Alternating Current, 60 Hertz, Single or Three Phase as agreed to. Energy maximum charges: Under demand, energy & transmission, and distribution & ancillary charge provisions of this rate schedule, the first 600 kilowatt hours/month: $0.14/KWH. All over 600 kilowatt hours/month: $0.10/KWH

431

Data:Edb2ca2c-9640-42fa-9ed1-f92b3b0f7c1b | Open Energy Information  

Open Energy Info (EERE)

Edb2ca2c-9640-42fa-9ed1-f92b3b0f7c1b Edb2ca2c-9640-42fa-9ed1-f92b3b0f7c1b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Grand Electric Coop, Inc Effective date: 2012/01/01 End date if known: Rate name: Schedule I - Irrigation (3 phase) Sector: Residential Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Database%20Now%20Compatible%20with%20Rates/Attachments/38/Grand%20Elec%20Coop,%20INC.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

432

Data:9da1e1db-7d57-4aa6-a92c-1b303a7b592c | Open Energy Information  

Open Energy Info (EERE)

da1e1db-7d57-4aa6-a92c-1b303a7b592c da1e1db-7d57-4aa6-a92c-1b303a7b592c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Lost River Electric Coop Inc Effective date: End date if known: Rate name: Farm and Home Controlled Outdoor Lighting Sector: Lighting Description: Source or reference: Rate Binder #7 (Illinois State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

433

Data:Af8e377a-e827-4c1c-8d40-15ebbad90015 | Open Energy Information  

Open Energy Info (EERE)

e377a-e827-4c1c-8d40-15ebbad90015 e377a-e827-4c1c-8d40-15ebbad90015 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Prairie Du Sac, Wisconsin (Utility Company) Effective date: 2009/07/06 End date if known: Rate name: Gs-2 General Service Single Phase Optional Time-of-Day 8am-8pm Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0583 per kilowatt-hour.

434

Data:5d9c9676-7747-42e3-998c-1caad36c2fac | Open Energy Information  

Open Energy Info (EERE)

676-7747-42e3-998c-1caad36c2fac 676-7747-42e3-998c-1caad36c2fac No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: CenterPoint Energy Effective date: 2013/01/25 End date if known: Rate name: Flood/Directional Lighting (MH 1,000w, Muni Discount) Sector: Lighting Description: The lighting fixtures served under this rate schedule will be served at standard secondary voltages as determined by Company. This tariff is applicable to any Retail Customer receiving un-metered service for one or more Company approved lighting fixtures which operate automatically every night from dusk to dawn and can be either: (1.) a Customer Owned Fixture or (2.) a Company Owned Fixture. The Company will install, make electrical connection(s), and maintain the lighting fixture(s).

435

Data:631c1d61-f8eb-4988-8af2-e672ae5f0cc3 | Open Energy Information  

Open Energy Info (EERE)

c1d61-f8eb-4988-8af2-e672ae5f0cc3 c1d61-f8eb-4988-8af2-e672ae5f0cc3 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Rural Elec Coop Inc Effective date: 2011/02/01 End date if known: Rate name: Seasonal 2C Even Sector: Commercial Description: * SEASONAL 2COS/EVEN MO BILLED. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous

436

Data:48acd99f-b0de-49c1-a848-cac0852a954d | Open Energy Information  

Open Energy Info (EERE)

acd99f-b0de-49c1-a848-cac0852a954d acd99f-b0de-49c1-a848-cac0852a954d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Omaha Public Power District Effective date: 2013/01/01 End date if known: Rate name: 464 Standby Service Sector: Description: To all Consumers normally serving all or a portion of their own electrical or mechanical load from Consumer-owned equipment when the sum of the combined nameplate rating of the primary generator(s) and the combined nameplate rating of the mechanical load converted to Equivalent Electrical Load is in excess of 25 kW . (Hereinafter the primary generator(s) and the Equivalent Electrical Load shall be referred to as "Units".)

437

Data:2721ebf0-ef63-4cc2-9eaf-16c1fdd040fb | Open Energy Information  

Open Energy Info (EERE)

ebf0-ef63-4cc2-9eaf-16c1fdd040fb ebf0-ef63-4cc2-9eaf-16c1fdd040fb No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of LaFayette, Georgia (Utility Company) Effective date: 2013/04/08 End date if known: Rate name: Small General Service Sector: Commercial Description: Source or reference: https://cas.sharepoint.illinoisstate.edu/grants/Sunshot/Lists/DATA%20ENTRY%20Additional%20Information%20Obtained/Attachments/72/City%20of%20LaFayette%20GA%20rates.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

438

Data:02030678-8389-4f28-9e4f-c1bcbc8cd91f | Open Energy Information  

Open Energy Info (EERE)

78-8389-4f28-9e4f-c1bcbc8cd91f 78-8389-4f28-9e4f-c1bcbc8cd91f No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service between 1,000kW and 5,000 kW Demand 7am-9pm Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

439

Data:2fed359d-6410-4740-9ef0-3c1ff1ed3d2a | Open Energy Information  

Open Energy Info (EERE)

fed359d-6410-4740-9ef0-3c1ff1ed3d2a fed359d-6410-4740-9ef0-3c1ff1ed3d2a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2008/08/18 End date if known: Rate name: Gs-1 General Service Three Phase Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0756 per kilowatt-hour.

440

Data:51488afd-8095-49e5-94e9-c12c1d241372 | Open Energy Information  

Open Energy Info (EERE)

afd-8095-49e5-94e9-c12c1d241372 afd-8095-49e5-94e9-c12c1d241372 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Otero County Electric Coop Inc Effective date: 2010/03/04 End date if known: Rate name: Residential - Time of Use Sector: Residential Description: Otero County Electric Cooperative, Inc. (OCEC), with its April 10 billing, will initiate a new program involving Energy Efficiency and rebates on certain items. The new "Energy Efficiency Fund" program will begin with the March 1 kWh usage. The program will be financed by a one percent adder to Members' bills and also by retaining the inspection and supervision fees that were previously paid to the New Mexico Public Regulation Commission (PRC). The OCEC Board of Trustees (Board) approved the basics of the fund at the January Board Meeting and will determine those programs that continue to provide the needed services to our Members.

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Data:Fed7685c-9038-4c1d-b7e3-6c157ad193f6 | Open Energy Information  

Open Energy Info (EERE)

Fed7685c-9038-4c1d-b7e3-6c157ad193f6 Fed7685c-9038-4c1d-b7e3-6c157ad193f6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Medford, Wisconsin (Utility Company) Effective date: 1997/06/27 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service above 1,000kW Demand 9am-9pm Primary Metering Discount Sector: Industrial Description: This rate will be applied to customers for all types of service if their monthly maximum demand is in excess of 1,000kW for 3 months in a consecutive 12-month period. Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0351 per kilowatt-hour.

442

Data:129b0fa7-f504-40b7-80c1-d29366afc6e9 | Open Energy Information  

Open Energy Info (EERE)

fa7-f504-40b7-80c1-d29366afc6e9 fa7-f504-40b7-80c1-d29366afc6e9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Westar Energy Inc Effective date: End date if known: Rate name: Parallel Generation Rider Sector: Description: Source or reference: www.westarenergy.com/wcm.nsf/publishedtariffs/9f46D6A628CE2E15862579F11004F77BA/$file/PGR/pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

443

Data:7e3eced0-177e-426d-8e88-eec53d2c1db5 | Open Energy Information  

Open Energy Info (EERE)

eced0-177e-426d-8e88-eec53d2c1db5 eced0-177e-426d-8e88-eec53d2c1db5 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Springfield, Oregon (Utility Company) Effective date: 2013/05/01 End date if known: Rate name: Private Lighting 90 W LPS L-3 Sector: Lighting Description: New Lighting systems shall be overhead construction consisting of wood poles, aerial circuits, and conventional street lighting luminaries with mast arms not longer than ten feet, or floodlighting luminaries with no mast arms. The installed luminaries shall use low-pressure sodium lamps. All equipment used to provide service under this schedule will be furnished, owned, operated and maintained by the Springfield Utility Board.

444

Data:A4c08466-e81b-43b5-a4d9-c1f6d4020e2e | Open Energy Information  

Open Energy Info (EERE)

466-e81b-43b5-a4d9-c1f6d4020e2e 466-e81b-43b5-a4d9-c1f6d4020e2e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Kenergy Corp Effective date: 2011/09/01 End date if known: Rate name: Light - 175 watt MH - Round Globe Sector: Lighting Description: APPLICABLE In all territory served. AVAILABILITY OF SERVICE Service under this schedule is offered, under the conditions set out hereinafter, for lighting applications on private property such as, but not Limited to, residential, commercial and industrial plant site or parking lot, other commercial area lighting, etc. to customers now receiving electric service from Kenergy at the same location. Service will be provided under written contract signed by customer prior to service commencing, when facilities are required other than fixture(s).

445

Data:3b2dbc70-4eeb-4989-9c9b-5412c1c251d8 | Open Energy Information  

Open Energy Info (EERE)

dbc70-4eeb-4989-9c9b-5412c1c251d8 dbc70-4eeb-4989-9c9b-5412c1c251d8 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Wilson, North Carolina (Utility Company) Effective date: 2009/04/01 End date if known: Rate name: General Service CP Rate for Loads Over 1,000 kW (CP-2-89) Sector: Industrial Description: "This schedule is available for electric service used by a non-residential customer with either a contract demand that equals or exceeds 1,000 kW or whenever the maximum registered or computed 15-minute demand equals or exceeds 1,000 kW in two or more of the preceding 12 months with the following exceptions: this schedule is not available for breakdown, standby, or supplementary service unless used in conjunction with the applicable standby or generation service rider for a continuous period of not less than one year, for resale service, for any seasonal customer."

446

Data:9728c02f-8f21-46f6-b45c-c1f9ddf58f4b | Open Energy Information  

Open Energy Info (EERE)

f-8f21-46f6-b45c-c1f9ddf58f4b f-8f21-46f6-b45c-c1f9ddf58f4b No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Norris Public Power District Effective date: 2012/01/20 End date if known: Rate name: SCHEDULE 7 - GENERAL SERVICE - ALL-ELECTRIC Sector: Commercial Description: summer is june 15th to oct 15th Available for commercial, industrial, and farm service, with 112-1/2 kVA or less of required transformer capacity, within the District's service area that use electricity as the exclusive source of energy for all normal uses. Qualification for this rate requires a space heating and/or water heating requirement.

447

Data:9e3fbc0a-49cc-47f0-b4c1-bf8fdef01206 | Open Energy Information  

Open Energy Info (EERE)

fbc0a-49cc-47f0-b4c1-bf8fdef01206 fbc0a-49cc-47f0-b4c1-bf8fdef01206 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Oconomowoc Utilities Effective date: 2007/09/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0598 per kilowatt-hour.

448

Data:Eafcb0b2-ebf0-4603-849a-2fb67c1f8214 | Open Energy Information  

Open Energy Info (EERE)

Eafcb0b2-ebf0-4603-849a-2fb67c1f8214 Eafcb0b2-ebf0-4603-849a-2fb67c1f8214 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jefferson Utilities Effective date: 2009/06/01 End date if known: Rate name: Cp-3 Industrial Power Time-of-Day Service between 1,000kW and 5,000 kW Demand 7am-9pm Primary Metering Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0686 per kilowatt-hour.

449

Data:4a52f4e7-062b-429f-a896-7932baafd5c1 | Open Energy Information  

Open Energy Info (EERE)

f4e7-062b-429f-a896-7932baafd5c1 f4e7-062b-429f-a896-7932baafd5c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Shenandoah Valley Elec Coop Effective date: 2001/01/01 End date if known: Rate name: SCHEDULE B-10 (UNBUNDLED) GENERAL SERVICE INDUSTRIAL V2 Sector: Industrial Description: AVAILABILITY Available to all member/customers for general service, commercial, industrial, single or multi-phase service, and all other non-residential service for all uses subject to the established rules and regulations of the Cooperative. First 20 kilowatts of billing demand - No Demand Charge All kilowatts of billing demand in excess of 20 -$6.71 per kW

450

Data:3111f77b-73c1-4e32-ba39-4ffc77966d02 | Open Energy Information  

Open Energy Info (EERE)

73c1-4e32-ba39-4ffc77966d02 73c1-4e32-ba39-4ffc77966d02 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Hertford, North Carolina (Utility Company) Effective date: 2009/02/01 End date if known: Rate name: Small General Sector: Commercial Description: To any non-residential customers, but not available for resale, breakdown or standby operation. For non-residential customers whose energy usage exceeds 3,000 kWh during any month of the previous 12 months, a demand will be measured for billing purposes. Add 200 kWh for each kW of Billing Demand between 10 and 30 kW, and add 100 kW of Billing Demand in excess of 30 kW.

451

Data:186ae1fe-40c1-41b6-8407-2a2c9ce45702 | Open Energy Information  

Open Energy Info (EERE)

40c1-41b6-8407-2a2c9ce45702 40c1-41b6-8407-2a2c9ce45702 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indiana Michigan Power Co (Indiana) Effective date: 2013/04/01 End date if known: Rate name: Industrial Power - Primary Sector: Industrial Description: * Available for general service customers. Customer's monthly billing demands under this tariff shall not be less than 600 kVA. The customer shall contract for a sufficient capacity to meet normal maximum requirements, but in no case shall the capacity contracted for be less than 1,000 kVA. Source or reference: https://www.indianamichiganpower.com/global/utilities/lib/docs/ratesandtariffs/Indiana/IM_INTB05-30-2012.pdf

452

Data:94558542-ad62-47a7-8be0-5c1e7b0eb390 | Open Energy Information  

Open Energy Info (EERE)

542-ad62-47a7-8be0-5c1e7b0eb390 542-ad62-47a7-8be0-5c1e7b0eb390 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: South Central Indiana REMC Effective date: 2010/06/01 End date if known: Rate name: OPTIONAL RENEWABLE ENERGY RIDER RATE Sector: Residential Description: Available to all consumers taking service concurrently under Rate Schedule - RS, Residential and Farm Rate; Rate Schedule - RS-TOU, Residential Time-of-Use Rate; Rate Schedule - RS-SEA, Residential Seasonal Rate; and Rate Schedule - ETS, Residential Off-Peak Rate . This Optional Rider is for the purchase of energy from renewable resources (predominantly landfill methane gas generation) South Central Indiana Rural Electric Membership Corporation reserves the right to limit the total number of participants under this Optional Rider.

453

Data:04aaea2c-5806-4c1f-bdc0-643d7a506b63 | Open Energy Information  

Open Energy Info (EERE)

aaea2c-5806-4c1f-bdc0-643d7a506b63 aaea2c-5806-4c1f-bdc0-643d7a506b63 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Service Co of Colorado Effective date: 2010/06/01 End date if known: Rate name: CUSTOMER-OWNED LIGHTING SERVICE - SCHEDULE COL- Metal Halide 250w Sector: Lighting Description: Applicable to the Colorado Department of Transportation and municipalities for Customer-Owned Lighting Service. This rate schedule is subject to all applicable Electric Rate Adjustments as on file and in effect in this tariff. Source or reference: http://www.xcelenergy.com/staticfiles/xe/Regulatory/Regulatory%20PDFs/psco_elec_entire_tariff.pdf

454

Data:9030dc9b-29a9-461b-b8c0-cf2d599b7c1c | Open Energy Information  

Open Energy Info (EERE)

b-29a9-461b-b8c0-cf2d599b7c1c b-29a9-461b-b8c0-cf2d599b7c1c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Calhoun, Georgia (Utility Company) Effective date: 2006/07/01 End date if known: Rate name: Security Lights 400 W Utility Type Sector: Lighting Description: Initial charge if a pole must be set for the security light only $150.00. Source or reference: Rate Binder # 2 Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service

455

Data:1595c353-64c1-46f3-bdcf-733f9dd30ecd | Open Energy Information  

Open Energy Info (EERE)

3-64c1-46f3-bdcf-733f9dd30ecd 3-64c1-46f3-bdcf-733f9dd30ecd No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of New Holstein, Wisconsin (Utility Company) Effective date: 2011/10/01 End date if known: Rate name: Cp-1 Small Power Service Primary Metering and Transformer Ownership Discount with Parallel Generation(20kW or less) Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0860 per kilowatt-hour.

456

Data:C645e0aa-66f3-4342-9bd4-b0f87af6c1c6 | Open Energy Information  

Open Energy Info (EERE)

5e0aa-66f3-4342-9bd4-b0f87af6c1c6 5e0aa-66f3-4342-9bd4-b0f87af6c1c6 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bangor Hydro-Electric Co Effective date: 2012/07/01 End date if known: Rate name: Municipal street lighting-Mercury Vapor 250 watts Sector: Lighting Description: Energy service only to municipalities owning, operating, and maintaining a street lighting system and limited to locations where secondary service is available. Traffic control lighting service may be rendered under this rate providing the customer furnishes the equipment. Customers taking service under this rate schedule are responsible for paying both Distribution Service and Stranded Cost.

457

Data:667dfb30-2d65-4a16-a17c-04c1d70f64f0 | Open Energy Information  

Open Energy Info (EERE)

dfb30-2d65-4a16-a17c-04c1d70f64f0 dfb30-2d65-4a16-a17c-04c1d70f64f0 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Tri-County Rural Elec Coop Inc Effective date: 2011/02/01 End date if known: Rate name: Seasonal Tri-County Even Sector: Commercial Description: * Seasonal Tri-County Billed Even MO. Source or reference: Rate binder # 4(Illinios State University) Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring:

458

Data:69daf6bc-7294-41c1-95c4-558bec598f3d | Open Energy Information  

Open Energy Info (EERE)

daf6bc-7294-41c1-95c4-558bec598f3d daf6bc-7294-41c1-95c4-558bec598f3d No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Northern Indiana Pub Serv Co Effective date: 2011/12/27 End date if known: Rate name: Industrial Power Service for Air Separation & Hydrogen Production Market Customers Sector: Industrial Description: TO WHOM AVAILABLE Available to Industrial Customers primarily in the air separation and hydrogen production process industry whose facilities are located in Indiana adjacent to existing sub-transmission and transmission electric facilities having capacity sufficient to meet the Customer's requirements, subject to the conditions set forth in this Rate Schedule and the Company Rules. Total capacity available under this Rate Schedule is limited to 285,000 kilowatts. Customer shall contract for a definite amount of electrical capacity which shall be no less than 150,000 kilowatts, which may include the aggregation of multiple delivery points to facilitate interruption of load. Customer shall also contract for at least 40 percent (40%) of its total electric load as interruptible in accordance with Option D under Rider 675.

459

Data:7ef57997-c1a5-47f9-89ff-772207c12139 | Open Energy Information  

Open Energy Info (EERE)

7-c1a5-47f9-89ff-772207c12139 7-c1a5-47f9-89ff-772207c12139 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Sauk City, Wisconsin (Utility Company) Effective date: 2008/08/18 End date if known: Rate name: Cp-1 TOD Small Power Optional Time-of-Day Service Primary Metering and Transformer Ownership Discount Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0756 per kilowatt-hour.

460

Data:92771da8-c1f4-4f42-b02c-d5bfa2a9f4ef | Open Energy Information  

Open Energy Info (EERE)

1da8-c1f4-4f42-b02c-d5bfa2a9f4ef 1da8-c1f4-4f42-b02c-d5bfa2a9f4ef No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Atlantic City Electric Co Effective date: 2013/02/01 End date if known: Rate name: SPL Experimental Induction Cobra Head 80 W Sector: Lighting Description: The following rates shall be applied to the kWh Usage for the particular light type and size to determine the monthly charge per light. Source or reference: http://www.atlanticcityelectric.com/_res/documents/NJTariffSectionIV.pdf Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh)

Note: This page contains sample records for the topic "nsa c1 browse" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Data:90c38b18-b741-49a3-bdf5-143686d026c1 | Open Energy Information  

Open Energy Info (EERE)

b18-b741-49a3-bdf5-143686d026c1 b18-b741-49a3-bdf5-143686d026c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: PUD No 1 of Chelan County Effective date: 2012/01/01 End date if known: Rate name: General Service Residential Demand 40 kW and over Three phase Sector: Residential Description: AVAILABILITY: 1. This Schedule is available throughout the area of Chelan County served by the District with the exception of the Stehekin area, and is applicable to commercial, small industrial, farm power and multiple-residential light, heat and power customers. 2. This rate is divided into two parts. Part A-2 is secondary metered services and Part B-23 is primary metered customers who own their own transformers and distribution service facilities and have a peak demand less than 800 KW. Part B-23 applies to existing customers as of April 15, 1994. No new customers will be furnished service under Part B-23.

462

Data:A626f719-5123-4939-86c1-470fe535dd99 | Open Energy Information  

Open Energy Info (EERE)

6f719-5123-4939-86c1-470fe535dd99 6f719-5123-4939-86c1-470fe535dd99 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Bartholomew County Rural E M C Effective date: 2011/10/01 End date if known: Rate name: Outdoor Security Lighting Service, High Pressure Sodium Flood Light, 250W (New Wood Pole) Sector: Lighting Description: Availability Available to any consumer of the Corporation where 120-volt service exists ahead of the meter loop for the use of Security Lighting, subject to the Corporation's Service Rules and Regulations. Customers receiving OSL service using a wood pole owned by the customer prior to May 1, 2000 or owned by the Corporation but required for a use other than OSL service shall receive service under the existing wood pole rate. All other customers shall receive service under the new wood pole rate.

463

Data:7847d8e6-0311-41e3-bffb-efdcd78c1fc4 | Open Energy Information  

Open Energy Info (EERE)

d8e6-0311-41e3-bffb-efdcd78c1fc4 d8e6-0311-41e3-bffb-efdcd78c1fc4 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Village of Hemingford, Nebraska (Utility Company) Effective date: 2012/10/01 End date if known: 2013/09/30 Rate name: General Service Large Heat Sector: Industrial Description: To any account that exceeds 100 kW for three (3) consecutive months where electricity is used for space heating, water heating and air conditioned and the service is measured by a separate meter. The service summer demands shall not exceed the highest winter demand of the past 12 months. An exception to this demand requirement is a geothermal or air-to-air heat pump space conditioning system.

464

Data:31412b9c-1c9a-4c34-bc05-31b73305106e | Open Energy Information  

Open Energy Info (EERE)

b9c-1c9a-4c34-bc05-31b73305106e b9c-1c9a-4c34-bc05-31b73305106e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Cornell, Wisconsin (Utility Company) Effective date: 2008/05/12 End date if known: Rate name: Rg-1 Residential Service Single Phase Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0644 per kilowatt-hour.

465

Data:0f8dc1c7-c1ce-4c0b-bbfa-70e77cfd9e44 | Open Energy Information  

Open Energy Info (EERE)

c7-c1ce-4c0b-bbfa-70e77cfd9e44 c7-c1ce-4c0b-bbfa-70e77cfd9e44 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Pearl River Valley El Pwr Assn Effective date: 2012/08/01 End date if known: Rate name: 70 OL-8 175 MV Sector: Lighting Description: Available to all Consumer's subject to Association's established rules and regulations. Association's standard outdoor lighting facilities. Service includes Association furnishing, operating, and maintaining lighting fixture, control equipment and lamp. When Association is required to alter its normal facilities to furnish a special outdoor lighting service, there will be an additional monthly charge. In addition to these charges, there will be a charge of $1.75 per month for each pole, and $2.00 per month for each transformer installed solely for lighting purposes.

466

Data:D8495d7d-adf9-4884-b0c1-529b3bb19f9c | Open Energy Information  

Open Energy Info (EERE)

d7d-adf9-4884-b0c1-529b3bb19f9c d7d-adf9-4884-b0c1-529b3bb19f9c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Jackson Electric Member Corp Effective date: 2006/06/01 End date if known: Rate name: Net Metering Rider Sector: Residential Description: Monthly Rate: Single Directional Metering @ $2.65 per month Bi-directional Metering @ $4.15 per month Source or reference: http://www.jacksonemc.com/home-manage-my-account/residential-rates/net-metering-rider Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months):

467

Data:Dacc2055-5b74-4f5c-9ac6-c1c2c92a6150 | Open Energy Information  

Open Energy Info (EERE)

Dacc2055-5b74-4f5c-9ac6-c1c2c92a6150 Dacc2055-5b74-4f5c-9ac6-c1c2c92a6150 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Hustisford Utilities Effective date: 2008/09/30 End date if known: Rate name: Rg-2 Residential Service Optional Time-of-Day Three Phase 7am-7pm with Parallel Generation(20kW or less) Sector: Residential Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0720 per kilowatt-hour.

468

Data:56bce06f-3e21-4f33-9d39-322ae527e2c1 | Open Energy Information  

Open Energy Info (EERE)

bce06f-3e21-4f33-9d39-322ae527e2c1 bce06f-3e21-4f33-9d39-322ae527e2c1 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Gastonia, North Carolina (Utility Company) Effective date: 2012/07/01 End date if known: Rate name: SCHEDULE CO - Commercial -- Other Sector: Commercial Description: Available only for support of consumers classified as other than Residential, Commercial/Governmental, of Industrial. Qualification for this rate is restricted to church buildings in which only activities of a religious nature are performed. The buildings may not be used as residences, nor may they serve as facilities for Commercial/Governmental or Industrial operations.

469

Data:71fa0c1b-06d3-46ba-b53b-779a9a2a3278 | Open Energy Information  

Open Energy Info (EERE)

c1b-06d3-46ba-b53b-779a9a2a3278 c1b-06d3-46ba-b53b-779a9a2a3278 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: MidAmerican Energy Co Effective date: 2006/03/06 End date if known: Rate name: Private Lighting - North - 175W MV MP - Billed Use Sector: Lighting Description: Source or reference: www.midamericanenergy.com/include/pdf/ Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >>

470

Data:18d584c1-dc75-4bd0-8192-40cca188002c | Open Energy Information  

Open Energy Info (EERE)

c1-dc75-4bd0-8192-40cca188002c c1-dc75-4bd0-8192-40cca188002c No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Menasha, Wisconsin (Utility Company) Effective date: 2011/04/06 End date if known: Rate name: Cp-4 Large Industrial Power Time-of-Day Service Sector: Industrial Description: This rate will be applied to customers for all types of service, if their monthly Maximum Measured Demand is in excess of 5,000 kW per month for three or more months in a consecutive 12-month period and their calculated Load Factor is greater than or equal to 85 percent. Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0716 per kilowatt-hour.

471

Data:2d5c8463-8354-4ca6-a9c1-3fd23615089a | Open Energy Information  

Open Energy Info (EERE)

63-8354-4ca6-a9c1-3fd23615089a 63-8354-4ca6-a9c1-3fd23615089a No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Juneau Utility Comm Effective date: 2010/07/15 End date if known: Rate name: Gs-2 General Service Three Phase Optional Time-of-Day 7am-7pm with Parallel Generation(20kW or less) Sector: Commercial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0753 per kilowatt-hour.

472

Data:061ad0bd-c955-4d3a-8bc1-7c4c1e855291 | Open Energy Information  

Open Energy Info (EERE)

c955-4d3a-8bc1-7c4c1e855291 c955-4d3a-8bc1-7c4c1e855291 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Public Serv Comm of Yazoo City Effective date: 2013/07/01 End date if known: Rate name: Electric - Schools Sector: Commercial Description: Source or reference: ISU Documentation Source Parent: Comments Applicability Demand (kW) Minimum (kW): Maximum (kW): History (months): Energy (kWh) Minimum (kWh): Maximum (kWh): History (months): Service Voltage Minimum (V): Maximum (V): Character of Service Voltage Category: Phase Wiring: << Previous 1 2 3 Next >> << Previous 1 2 3 Next >> Seasonal/Monthly Demand Charge Structures

473

Data:1d264bc0-22bf-44c1-98b5-5742e800e2e9 | Open Energy Information  

Open Energy Info (EERE)

bc0-22bf-44c1-98b5-5742e800e2e9 bc0-22bf-44c1-98b5-5742e800e2e9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Provo City Corp (Utility Company) Effective date: 2011/07/01 End date if known: Rate name: 6 (General Service- High Voltage) Sector: Commercial Description: This schedule is available at any point on the Energy Department electric system where facilities of adequate capacity and standard high voltage levels are available. To qualify for service under this rate schedule, a customer must (1) have immediate access (proximity) to the Energy Department's high voltage electric system; (2) accept delivery at Provo's standard high voltage levels; (3) accept delivery at a substation that is dedicated solely to the customer's use and (4) own the substation at the point of delivery.

474

Data:5072c02a-a924-4f48-9af0-6c1e62e35368 | Open Energy Information  

Open Energy Info (EERE)

c02a-a924-4f48-9af0-6c1e62e35368 c02a-a924-4f48-9af0-6c1e62e35368 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Town of Readsboro, Vermont (Utility Company) Effective date: 2012/08/01 End date if known: Rate name: Outdoor Lighting- Ornamental Lighting and Poles (Sodium Vapor Road Cut-Off 70 W) Sector: Lighting Description: GMP shall own, supply and maintain all ornamental lighting and poles, with energy supplied by underground facilities at the rates set forth below. Installation of ornamental poles, luminaries and wires will be paid for by the Customer as a line extension under GMP's line extension tariff and Public Service Board ("PSB") Rule 5.600. The Customer will be required to purchase and install 2" Sch. 40 electrical grade EPVC conduit and install pre-cast concrete bases for mounting the light poles. Customers should contact GMP's engineering department for details and assistance.

475

Data:6853a2b0-c1fa-4d16-8d66-d8161c45f0ca | Open Energy Information  

Open Energy Info (EERE)

b0-c1fa-4d16-8d66-d8161c45f0ca b0-c1fa-4d16-8d66-d8161c45f0ca No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Entergy New Orleans Inc Effective date: 2010/05/31 End date if known: Rate name: Security lighting - MH (NA) - 400W Sector: Lighting Description: Available at all points through the territory served by the company where facilities of adequate capacity and suitable phase and voltage are adjacent to the premises to be served, and service is taken according to the service standards and service regulations of the company. Not available for temporary service. Applicable for service to customers contracting for directional security lighting service from flood lighting equipment supplied by Company. The service provided pursuant to this rate schedule is not for the benefit of any person, firm, legal entity, or governing body other than customer.

476

Data:F54a5b0e-032b-4cac-923d-f45c35da5c1e | Open Energy Information  

Open Energy Info (EERE)

b0e-032b-4cac-923d-f45c35da5c1e b0e-032b-4cac-923d-f45c35da5c1e No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: Indiana Michigan Power Co (Indiana) Effective date: 2013/04/01 End date if known: Rate name: Electric Heating General Sector: Commercial Description: This tariff is withdrawn except for the present installations of customers receiving service hereunder at premises served prior to April 6, 1981. When new or upgraded facilities are required to maintain service to a Tariff E.H.G. customer, the customer shall be removed from Tariff E.H.G. and be required to take service under an appropriate general service tariff for which the customer qualifies.

477

Data:87eb01c0-e872-4026-9c8c-1c2977b262d9 | Open Energy Information  

Open Energy Info (EERE)

1c0-e872-4026-9c8c-1c2977b262d9 1c0-e872-4026-9c8c-1c2977b262d9 No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Loading... 1. Basic Information 2. Demand 3. Energy << Previous 1 2 3 Next >> Basic Information Utility name: City of Elroy, Wisconsin (Utility Company) Effective date: 2009/01/22 End date if known: Rate name: Cp-4 Industrial Power Interruptible Service over 500kW Demand Sector: Industrial Description: Power Cost Adjustment Clause - All metered rates shall be subject to a positive or negative power cost adjustment charge equivalent to the amount by which the current cost of power (per kilowatt-hour of sales) is greater or lesser than the base cost of power purchased (per kilowatt-hour of sales). The base cost of power (U) is $0.0510 per kilowatt-hour.