Sample records for npdes permit application

  1. Washington Environmental Permit Handbook - NPDES Construction...

    Open Energy Info (EERE)

    Washington Environmental Permit Handbook - NPDES Construction Stormwater General Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory...

  2. Vermont Permit and License Information: NPDES Stormwater General...

    Open Energy Info (EERE)

    SitesLegal Abstract Permit and licensing information for Clean Water Act 304 National Pollution Discharge Elimination System (NPDES) Permits for general construction. Published NA...

  3. 300 area TEDF NPDES Permit Compliance Monitoring Plan

    SciTech Connect (OSTI)

    Loll, C.M.

    1995-09-05T23:59:59.000Z

    This document presents the 300 Area Treated Effluent Disposal Facility (TEDF) National Pollutant Discharge Elimination System (NPDES) Permit Compliance Monitoring Plan (MP). The MP describes how ongoing monitoring of the TEDF effluent stream for compliance with the NPDES permit will occur. The MP also includes Quality Assurance protocols to be followed.

  4. Wastewater Regulations for National Pollutant Discharge Elimination System (NPDES) Permits, Underground Injection Control (UIC) Permits, State Permits, Water Quality Based Effluent Limitations and Water Quality Certification (Mississippi)

    Broader source: Energy.gov [DOE]

    The Wastewater Regulations for National Pollutant Discharge Elimination System (NPDES) Permits, Underground Injection Control (UIC) Permits, State Permits, Water Quality Based Effluent Limitations...

  5. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    SciTech Connect (OSTI)

    Loll, C.M.

    1994-10-13T23:59:59.000Z

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures.

  6. Washington Environmental Permit Handbook - NPDES Construction Stormwater

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess |Open

  7. NPDES Permit Writers Manual | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: Energy Resources JumpNEFAppropriation andWebsite Jump to:Permit

  8. NPDES permit compliance and enforcement: A resource guide for oil and gas operators

    SciTech Connect (OSTI)

    NONE

    1998-12-01T23:59:59.000Z

    During the fall of 1996, the Interstate Oil and Gas Compact Commission sponsored sessions for government and industry representatives to discuss concerns about the National Pollution Discharge Elimination System (NPDES) program under the Clean Water Act. In January 1997, the NPDES Education/Communication/Training Workgroup (ECT Workgroup) was established with co-leaders from the Environmental Protection Agency (EPA) and industry. The ECT Workgroup`s purpose was to develop ideas that would improve communication between NPDES regulators and the oil and gas industry regarding NPDES compliance issues. The Workgroup focused on several areas, including permit compliance monitoring and reporting, enforcement activity and options, and treatment technology. The ECT Workgroup also discussed the need for materials and information to help NPDES regulatory agency personnel understand more about oil and gas industry exploration and extraction operations and treatment processes. This report represents a compendium of the ECT Workgroup`s efforts.

  9. Washington Environmental Permit Handbook - NPDES General Permit Coverage |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess |OpenOpen

  10. Washington Environmental Permit Handbook - NPDES Individual Permit Coverage

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess |OpenOpen|

  11. Oregon NPDES Permits, Forms, and Information | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri:Energy Information Fees for UndergroundInformationPermits,

  12. Hawaii National Pollutant Discharge Elimination System (NPDES...

    Open Energy Info (EERE)

    LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Hawaii National Pollutant Discharge Elimination System (NPDES) Permit PacketPermittingRegulatory...

  13. Overview of the Storm Water Individual Permit.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the LANL Storm Water Individual Permit? Poster, Individual Permit for Storm Water, NPDES Permit No...

  14. Using Arc/Info GIS to help implement the National Pollutant Discharge Elimination System (NPDES) stormwater permit for Los Angeles County

    SciTech Connect (OSTI)

    Levine, D.A.; Pace, P.J. [Oak Ridge National Lab., TN (United States); Woods, J.A.; DePoto, W. [Los Angeles County Department of Public Works, Alhambra, CA (United States). Environmental Programs Division

    1997-06-01T23:59:59.000Z

    One of Los Angeles County Department of Public Works` many responsibilities is to manage non-point pollution that enters the storm drain network within Los Angeles County. The management of this non-point source pollution is mandated by the NPDES guidelines under the Federal Clean Water Act. These guidelines require the County to monitor the drainage network and the storm water and urban runoff flowing through it. The County covers over 3,117 square miles, with the NPDES Permit covering over 3,100 square miles and over 2500 miles of storm drains. A proposed solution to monitor and manage this vast geographic area is centered upon an Arc/Info GIS. Some of the many concerns which need to be addressed include the administration and evaluation of Best Management Practices (BMP`s), storm drain inspection for illegal connections and illicit discharges, and pollutant load assessment and modeling. The storm drain network and other coverages will be related to external data bases currently used for facility management and planning. This system would be used for query purposes to perform spatial modeling and {open_quotes}what if{close_quotes} scenarios needed to create maps and reports required by the permit and to evaluate various BMP implementation strategies.

  15. Permit application modifications

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  16. Montana Water Quality Permit Application, Nondegradation Authorization...

    Open Energy Info (EERE)

    LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material: Montana Water Quality Permit Application, Nondegradation Authorization, and Permit FeesPermitting...

  17. AGENDA ADEP Surface Water Protection Project NPDES Storm Water...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ADEP Surface Water Protection Project NPDES Storm Water Individual Permit Bi-Annual Update Public Meeting January 22, 2014 5:30-7:30 p.m. Cities of Gold Conference Center...

  18. ENVIRONMENTAL ASSESSMENT FOR THE NPDES STORM WATER COMPLIANCE ALTERNATIVES AT THE SRS

    SciTech Connect (OSTI)

    Shedrow, C

    2006-11-01T23:59:59.000Z

    The U.S. Department of Energy (DOE) prepared this environmental assessment (EA) to evaluate the potential environmental impacts associated with proposed and alternative actions to achieve water quality permit compliance at 38 storm water outfalls located at the Savannah River Site (SRS) (Figure 1-1). Effluent monitoring data indicates that some of these outfalls may not presently comply with new National Pollutant Discharge Elimination System (NPDES) Storm Water General Permit effluent standards that became effective July 1, 2005 (SCR000000). The NPDES permit requires that best management practices (BMPs) be implemented and maintained, as necessary, to ensure that storm water discharges at SRS do not cause or contribute to the contravention of applicable state water quality standards (WQS).

  19. Solar Photovoltaic (PV) System Permit Application Checklist

    Broader source: Energy.gov [DOE]

    The Permit Application Checklist is intended to be used as a best management practice when establishing local government requirements for residential and commercial solar photovoltaic (PV) system permits. Local governments may modify this checklist to accommodate their local ordinances, code requirements, and permit procedures.

  20. Environmental Compliance Guide. Guidance manual for Department of Energy compliance with the Clean Water Act: National Pollutant Discharge Elimination System (NPDES)

    SciTech Connect (OSTI)

    Not Available

    1982-07-01T23:59:59.000Z

    This manual provides general guidance for Department of Energy (DOE) officials for complying with Sect. 402 of the Clean Water Act (CWA) of 1977 and amendments. Section 402 authorizes the US Environmental Protection Agency (EPA) or states with EPA approved programs to issue National Pollutant Discharge Elimination System (NPDES) permits for the direct discharge of waste from a point source into waters of the United States. Although the nature of a project dictates the exact information requirements, every project has similar information requirements on the environmental setting, type of discharge(s), characterization of effluent, and description of operations and wastewater treatment. Additional information requirements for projects with ocean discharges, thermal discharges, and cooling water intakes are discussed. Guidance is provided in this manual on general methods for collecting, analyzing, and presenting information for an NPDES permit application. The NPDES program interacts with many sections of the CWA; therefore, background material on pertinent areas such as effluent limitations, water quality standards, toxic substances, and nonpoint source pollutants is included in this manual. Modifications, variances, and extensions applicable to NPDES permits are also discussed.

  1. State of Washington Joint Aquatic Resource Permit Application (JARPA)

    E-Print Network [OSTI]

    Manning, Sandra

    2001-01-01T23:59:59.000Z

    all of the required permits, there is a greater likelihoodinform applicants on which permits they need, resulting inreduce the need for permit revisions that are currently

  2. Application for Presidential Permit OE Docket No. PP-362 Champlain...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Addendum to Presidential Permit Letter. TDI Presidential Permit Application Addendum.pdf More Documents & Publications PP-362 Champlain Hudson Power Express, Inc. Application for...

  3. Hanford facility dangerous waste permit application

    SciTech Connect (OSTI)

    none,

    1991-09-18T23:59:59.000Z

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit.

  4. Storm Water Individual Permit.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    information meeting to discuss the biannual update on the NPDES Storm Water Individual Permit. Wednesday, January 22, 2014 5:30 p.m. Cities of Gold Conference Center 10 Cities of...

  5. Montana Ground Water Pollution Control System Permit Application...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Web Site: Montana Ground Water Pollution Control System Permit Application Forms Webpage Abstract Provides a list of permit...

  6. Application for Presidential Permit OE Docket No. PP-362 Champlain...

    Energy Savers [EERE]

    Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc. Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc....

  7. Application for Presidential Permit OE Docket No. PP-362 Champlain...

    Energy Savers [EERE]

    Update to Presidential Permit Letter. CHPE-USDOE-Amendment.pdf More Documents & Publications EIS-0447: Final Environmental Impact Statement Application for a Presidential Permit OE...

  8. Hanford Site air operating permit application

    SciTech Connect (OSTI)

    NONE

    1995-05-01T23:59:59.000Z

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  9. 300 area TEDF permit compliance monitoring plan

    SciTech Connect (OSTI)

    BERNESKI, L.D.

    1998-11-20T23:59:59.000Z

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  10. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Vickie Bedard Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Vickie Bedard Application from Northern Pass to construct, operate and maintain...

  11. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Larry Rappaport Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Larry Rappaport Application from Northern Pass Transmission to...

  12. Application for Presidential Permit OE Docket No. PP-229 Tucson...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Company Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company Application from Tucson Electric Power Company to construct, operate and maintain...

  13. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Erick Berglund, Jr. Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Erick Berglund, Jr. Application from Northern Pass to construct, operate...

  14. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fran Buteau Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Fran Buteau Application from Northern Pass Transmission to construct,...

  15. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    State Senator Jeanie Forrester Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from State Senator Jeanie Forrester Application from...

  16. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Mary Bearor Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Mary Bearor Application from Northern Pass Transmission to construct,...

  17. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Robert Cote Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Robert Cote Application from Northern Pass to construct, operate and maintain...

  18. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    John Doane Sr. Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from John Doane Sr. Application from Northern Pass to construct, operate and...

  19. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nancy Rheinhardt Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Nancy Rheinhardt Application from Northern Pass Transmission to...

  20. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Rana Klug Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Rana Klug Application from Northern Pass to construct, operate and maintain electric...

  1. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Serita Frey Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Serita Frey Application from Northern Pass to construct, operate and maintain...

  2. Application for Presidential Permit OE Docket No. PP-235 Sempra...

    Office of Environmental Management (EM)

    35 Sempra Energy Resources. Application for Presidential Permit OE Docket No. PP-235 Sempra Energy Resources. Application from Sempra Energy Resources to construct, operate and...

  3. Application for presidential permit OE Docket No. PP-305 Montana...

    Office of Environmental Management (EM)

    Update Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Update Application from Montana Alberta Tie Ltd to construct, operate, and maintain...

  4. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Anne Moschella Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Anne Moschella Application from Northern Pass to construct, operate and...

  5. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Lorna Rose Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Lorna Rose Application from Northern Pass to construct, operate and maintain...

  6. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    Karen Brand Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Karen Brand Application from Soule Hydro to construct, operate and maintain electric...

  7. Application for presidential permit OE Docket No. PP-305 Montana...

    Office of Environmental Management (EM)

    Ltd Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd Application from Montana Alberta Tie Ltd to construct, operate, and maintain electric...

  8. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Gina Neily Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Gina Neily Application from Northern Pass to construct, operate and maintain...

  9. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Roy Stever Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Roy Stever Application from Northern Pass Transmission to construct,...

  10. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Stephen Buzzell and Lelah Sullivan Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Stephen Buzzell and Lelah Sullivan Application from...

  11. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Broader source: Energy.gov (indexed) [DOE]

    Sen Murkowski Letter.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska Application for...

  12. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Courtney Kearley Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Courtney Kearley Application from Northern Pass to construct, operate and...

  13. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Nicholas Karakoudas Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Nicholas Karakoudas Application from Northern Pass to construct, operate...

  14. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Maureen Quinn Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Maureen Quinn Application from Northern Pass to construct, operate and maintain...

  15. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Michelle Kleindienst Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Michelle Kleindienst Application from Northern Pass to construct, operate...

  16. Application for Presidential Permit OE Docket No. PP-044 Northern...

    Office of Environmental Management (EM)

    44 Northern Electric Cooperative Association Application for Presidential Permit OE Docket No. PP-044 Northern Electric Cooperative Association Application from Northern Electric...

  17. Application for presidential permit OE Docket No. PP-305 Montana...

    Office of Environmental Management (EM)

    Scope Change 1 Application for presidential permit OE Docket No. PP-305 Montana Alberta Tie Ltd: Scope Change 1 Application from Montana Alberta Tie Ltd to construct, operate,...

  18. Application for Presidential permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    and Requests for Intervention Received on the Amended Application Application for Presidential permit OE Docket No. PP-371 Northern Pass Transmission: Comments and Requests...

  19. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    Energy Authority Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska Energy Authority Application from Soule Hydro to construct, operate and...

  20. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Karen Skurka Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Karen Skurka Application from Northern Pass Transmission to...

  1. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Fred Brownson Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Fred Brownson Application from Northern Pass Transmission to...

  2. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Jim Cannon Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Jim Cannon Application from Northern Pass to construct, operate and maintain...

  3. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Campton Conservation Commission Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Campton Conservation Commission Application from Northern Pass...

  4. Application for Presidential Permit OE Docket No. PP-059 Central...

    Office of Environmental Management (EM)

    59 Central Power and Light Company (CPL) Application for Presidential Permit OE Docket No. PP-059 Central Power and Light Company (CPL) Application from Central Power and Light...

  5. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Ann Vennerbeck Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Ann Vennerbeck Application from Northern Pass to construct, operate and...

  6. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hayes Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Pamela Hayes Application from Northern Pass to construct, operate and maintain electric...

  7. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Robert Martin Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Robert Martin Application from Northern Pass Transmission to...

  8. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Susan Seitz Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Susan Seitz Application from Northern Pass to construct, operate and maintain...

  9. Application for Presidential Permit OE Docket No. PP-334 Baja...

    Office of Environmental Management (EM)

    Baja Wind Transmission, LLC Application for Presidential Permit OE Docket No. PP-334 Baja Wind Transmission, LLC Application from Baja Wind Transmission, LLC to construct, operate,...

  10. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Pamela Martin Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela Martin Application from Northern Pass Transmission to...

  11. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Joseph Keenan Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Joseph Keenan Application from Northern Pass Transmission to...

  12. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    John Brodeer Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from John Brodeer Application from Northern Pass Transmission to...

  13. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Paula VandeWerken Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Paula VandeWerken Application from Northern Pass Transmission...

  14. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from James Kennedy Application from Northern Pass to construct, operate and maintain...

  15. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Michael Marino Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Michael Marino Application from Northern Pass Transmission to...

  16. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Weeks Lancaster Trust Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from The Weeks Lancaster Trust Application from Northern Pass to...

  17. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Elisha Gray Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Elisha Gray Application from Northern Pass Transmission to construct,...

  18. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Hanglin Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Pamela Hanglin Application from Northern Pass to construct, operate and maintain...

  19. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Roy Kjendal Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Roy Kjendal Application from Northern Pass to construct, operate and maintain...

  20. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    City of Concord - James Kennedy Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from City of Concord - James Kennedy Application from...

  1. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Lee Ann Moulder Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Lee Ann Moulder Application from Northern Pass Transmission to...

  2. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Alice Peatman Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Alice Peatman Application from Northern Pass Transmission to...

  3. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    The Nature Conservancy Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from The Nature Conservancy Application from Northern Pass to construct,...

  4. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Steve Nogueira Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Steve Nogueira Application from Northern Pass to construct, operate and...

  5. Application for presidential permit OE Docket No. PP-234 Baja...

    Energy Savers [EERE]

    234 Baja California Power, Inc Application for presidential permit OE Docket No. PP-234 Baja California Power, Inc Application from Baja California Power to construct, operate, and...

  6. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Taras Kucman Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Taras Kucman Application from Northern Pass to construct, operate and maintain...

  7. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Lindsey Coombs Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Lindsey Coombs Application from Northern Pass to construct, operate and...

  8. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Linda Upham Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Linda Upham Application from Northern Pass Transmission to construct,...

  9. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bruce Adami Application for Presidential Permit OE Docket No. PP-371 Northern Pass: Comments from Bruce Adami Application from Northern Pass to construct, operate and maintain...

  10. SWRCB General NPDES Permits | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries Pvt Ltd Jump to:RoscommonSBY Solutions Jump to:SMInformationSVVCenterSWRCB

  11. Idaho NPDES Permits Webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty, Texas:ITC TransmissionIdaho

  12. NPDES Permit Program Website | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: Energy Resources JumpNEFAppropriation andWebsite Jump to:

  13. RCRA Hazardous Waste Part A Permit Application: Instructions...

    Open Energy Info (EERE)

    Part A Permit Application: Instructions and Form (EPA Form 8700-23) Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: RCRA Hazardous Waste Part A Permit...

  14. Application for Presidential Permit OE Docket No. PP-334 Energia...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presidential Permit OE Docket No. PP-334 Energia Juarez U.S. Transmission, LLC,: Record of Decision Application for Presidential Permit OE Docket No. PP-334 Energia Juarez U.S....

  15. Application for presidential permit OE Docket No. PP-334 Baja...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    presidential permit OE Docket No. PP-334 Baja Wind U.S Transmission LLC: Federal Register Notice Volume 73, No. 36 - Feb. 22, 2008 Application for presidential permit OE Docket No....

  16. U of O Retired Staff Parking Permit Application

    E-Print Network [OSTI]

    Cina, Jeff

    U of O Retired Staff Parking Permit Application Please Print Last Name Faculty Retired Non-tenure track instructor Retired Officer of Research Type of parking permit desired (no cost for permit) Payment Method: I intend to pay immediately, in full, using cash, check, Visa orf

  17. Alcohol Services Category #1 # Permit Application Category #2

    E-Print Network [OSTI]

    Powers, Robert

    Alcohol Services Category #1 # Permit Application Category #2 Category #3 Facility to be Used If an outdoor event, attach UNL Police approved licensed area plan to Permit Request. This individual may TO OBTAIN THE REQUIRED ALCOHOL SERVICES PERMIT FOR EACH EVENT. THE APPROVED CATERER IS RESPONSIBLE

  18. NMDOT Application for Permit to Install Utility Facilities Within...

    Open Energy Info (EERE)

    Reference LibraryAdd to library Legal Document- OtherOther: NMDOT Application for Permit to Install Utility Facilities Within Public ROWLegal Published NA Year Signed or Took...

  19. NMSLO Application for Permit to Conduct Geophysical Exploration...

    Open Energy Info (EERE)

    Reference LibraryAdd to library Legal Document- OtherOther: NMSLO Application for Permit to Conduct Geophysical Exploration on Unleased State LandsLegal Published NA Year...

  20. Nevada Sample Application for Permit Under Utility Environmental...

    Open Energy Info (EERE)

    Protection Act. Lionel Sawyer & Collins. Initial Application of K Road Moapa Solar, LLC for a Permit to Construct A Transmission Line Under the Utility Environmental...

  1. Application to Amend Presidential Permit OE Docket No. PP-022...

    Energy Savers [EERE]

    to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border: Federal Register Notice Application to Amend Presidential Permit OE Docket No....

  2. Application for Permit to Construct Access Driveway Facilities...

    Open Energy Info (EERE)

    Application for Permit to Construct Access Driveway Facilities on Highway Right of Way DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link...

  3. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Broader source: Energy.gov (indexed) [DOE]

    Border. Opinion of Counsel - 20140609.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from Pamela...

  4. Application for Presidential Permit OE Docket No. PP-257 Emera...

    Broader source: Energy.gov (indexed) [DOE]

    maintain electric transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-257 Emera Energy Services, Inc. More Documents &...

  5. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Broader source: Energy.gov (indexed) [DOE]

    Peggy Wilson, Alaska State Legislature.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska...

  6. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    Hydro: Notice of Intervention by Department of Agriculture Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department of Agriculture...

  7. Application for presidential permit OE Docket No. PP-299 Sea...

    Broader source: Energy.gov (indexed) [DOE]

    facilities at the U.S-Canada border. - Federal Register Notice Application for presidential permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System...

  8. Application for presidential permit OE Docket No. PP-305 Montana...

    Broader source: Energy.gov (indexed) [DOE]

    at the U.S-Canada border. Federal Register Notice Vol 70 No 210. Application for presidential permit OE Docket No. 305 Montana Alberta Tie Ltd More Documents &...

  9. Application for Presidential Permit OE Docket No. PP-400 TDI...

    Office of Environmental Management (EM)

    Project - Comments and Motion to Intervene of Conservation Law Foundation Application for Presidential Permit OE Docket No. PP-400 TDI-NE - New England Clean Power Link Project -...

  10. Amended Application for Presidential Permit OE Docket No. PP...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Line: Federal Register Notice, Volume 79, No. 222 - Nov. 18, 2014 Amended Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission...

  11. Application for presidential permit OE Docket No. PP-362 Champlain...

    Broader source: Energy.gov (indexed) [DOE]

    Federal Register Notice Volume 75, No. 43 More Documents & Publications Application for Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc. EIS-0447:...

  12. Application for presidential permit OE Docket No. PP-362 Champlain...

    Broader source: Energy.gov (indexed) [DOE]

    and maintain electric transmission facilities at the U.S. - Canada Border. FINAL TDI Presidential Permit Application. January 25, 2010 More Documents & Publications EIS-0447:...

  13. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Broader source: Energy.gov (indexed) [DOE]

    from Dept of Agriculture 08-28-13.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Notice of Intervention by Department...

  14. Application for Presidential Permit OE Docket No. PP-299 Sea...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    99 Sea Breeze Pacific Regional Transmission System, INC Application for Presidential Permit OE Docket No. PP-299 Sea Breeze Pacific Regional Transmission System, INC TBDApplication...

  15. Application for presidential permit OE Docket No. PP-300 Maine...

    Office of Environmental Management (EM)

    0 Maine Public Service Company Application for presidential permit OE Docket No. PP-300 Maine Public Service Company Applicationfrom Maine Public Service Company to construct,...

  16. Application for Presidential Permit OE Docket No. PP-369 British...

    Office of Environmental Management (EM)

    Transmission Corporation and British Columbia Hydro and Power Authority Application for Presidential Permit OE Docket No. PP-369 British Columbia Transmission Corporation and...

  17. Application for Presidential Permit OE Docket No. PP-398 Minnesota...

    Office of Environmental Management (EM)

    Comments from Roseau County Board of Commissioners Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Comments from Roseau...

  18. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Broader source: Energy.gov (indexed) [DOE]

    - Letter from City of Saxman, Alaska.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from Alaska State...

  19. Application for Presidential Permit OE Docket No. PP-229 Tucson...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Company: Federal Register Notice Volume 65, No. 183 - Sep. 20, 2000 Application for Presidential Permit OE Docket No. PP-229 Tucson Electric Power Company: Federal Register Notice...

  20. Application for Presidential Permit OE Docket No. PP-398 Minnesota...

    Office of Environmental Management (EM)

    Federal Register Notice, Vol. 79, No. 93 - May 14, 2014 Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Federal...

  1. Application for Presidential Permit OE Docket No. PP-366 Twin...

    Broader source: Energy.gov (indexed) [DOE]

    maintain electric transmission facilities at the U.S. - Canada Border. Application for Presidential Permit OE Docket No. PP-366 Twin Rivers Paper Company, Inc. More Documents &...

  2. Application for Presidential Permit OE Docket No. PP-362 Champlain...

    Office of Environmental Management (EM)

    : Record of Decision for Issuing a Presidential Permit for the CHPE Transmission Line Project: Federal Register Notice, Volume 79, No. 190 - Oct. 1, 2014 Application for...

  3. Application for presidential permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Public Scoping Period Reopened: Federal Register Volume 73, No. 183 - Jun. 15, 2011 Application for...

  4. Application for presidential permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    LLC: Federal Register Notice Volume 75, No. 220 - Nov. 16, 2010 Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Federal Register Notice...

  5. Application for Presidential Permit OE Docket No. PP-398 Minnesota...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Amended Letter to New Border Crossing Application for Presidential Permit OE Docket No. PP-398 Minnesota Power - Great Northern Transmission Line: Amended Letter to New Border...

  6. Application for presidential permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    Letter of MOU Cancellation Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC: Letter of MOU Cancellation March 7, 2011 Northern Pass...

  7. Application for Presidential Permit OE Docket No: PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Northern Pass Transmission: Comments from William and Michelle Shoemaker Application for Presidential Permit OE Docket No: PP-371 Northern Pass Transmission: Comments from William...

  8. Application for Presidential Permit OE Docket No. PP-400 TDI...

    Office of Environmental Management (EM)

    Motion to Intervene of The Northeast Power Coordinating Council, Inc. Application for Presidential Permit OE Docket No. PP-400 TDI-NE - New England Clean Power Link Project:...

  9. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    National Park Service - Wendy Jannsen Application for Presidential Permit OE Docket No. PP-371 Northern Pass Transmission: Comments from National Park Service - Wendy Jannsen...

  10. Application for presidential permit OE Docket No. PP-334 Energia...

    Broader source: Energy.gov (indexed) [DOE]

    Energia Sierra Juarex U.S Transmission LLC More Documents & Publications Application for presidential permit OE Docket No. PP-334 Energia Sierra Juarex U.S Transmission LLC:...

  11. Application for presidential permit OE Docket No. PP-371 Northern...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for a Presidential Permit to construct a 1,200 MW high voltage direct current ("HVDC") transmission line (the "Application") from the Des Cantons substation in Quebec, to...

  12. Idaho Application for Permit to Convert a Geothermal Injection...

    Open Energy Info (EERE)

    navigation, search OpenEI Reference LibraryAdd to library Form: Idaho Application for Permit to Convert a Geothermal Injection Well - Form 4003-3 Form Type ApplicationNotice Form...

  13. Idaho Right-of-Way Encroachment Application and Permit - Other...

    Open Energy Info (EERE)

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Idaho Right-of-Way Encroachment Application and Permit - Other Encroachments Form Type ApplicationNotice...

  14. State Waste Discharge Permit application: 400 Area Septic System

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affects groundwater or has the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 400 Area Septic System. The influent to the system is domestic waste water. Although the 400 Area Septic System is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. Therefore, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used.

  15. Hanford facility dangerous waste permit application, PUREX storage tunnels

    SciTech Connect (OSTI)

    Haas, C. R.

    1997-09-08T23:59:59.000Z

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24).

  16. Vermont Permit and License Information: NPDES Stormwater General Permits

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga,planning methodologiesVenkataraya| Open EnergyInformation

  17. car_app1.doc STAFF PARKING PERMIT APPLICATION

    E-Print Network [OSTI]

    Haase, Markus

    and drop off points Frequency of lifts (days per week) 6. Car Sharing You can share a group permit with upcar_app1.doc STAFF PARKING PERMIT APPLICATION The information supplied on this form will allow (whichever is quicker) from campus to home? (Departing campus at 1700 hours) #12;car_app1.doc 4. Staff

  18. NMDOT Application for Permit to Construct an Access or Median...

    Open Energy Info (EERE)

    Reference LibraryAdd to library Legal Document- OtherOther: NMDOT Application for Permit to Construct an Access or Median Opening on Public Right of WayLegal Published NA...

  19. Idaho Application for Permit to Construct Modify or Maintain...

    Open Energy Info (EERE)

    LibraryAdd to library Legal Document- RegulationRegulation: Idaho Application for Permit to Construct Modify or Maintain an Injection Well - Form 42-39-1Legal Published NA...

  20. RRC - Supplemental Application Information for Permit to Maintain...

    Open Energy Info (EERE)

    Supplemental Application Information for Permit to Maintain and Use a Commercial Oil and Gas Waste Disposal Pit Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  1. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Broader source: Energy.gov (indexed) [DOE]

    Register Notice. PP-387 Soule Hydro FRN.pdf More Documents & Publications Application for Presidential Permit OE Docket No. PP-387 Soule Hydro: Comments from City of Saxman, Alaska...

  2. Application for Presidential Permit OE Docket No. PP-395 Emera...

    Office of Environmental Management (EM)

    Maine: Federal Register Notice, Volume 79, No. 81 - April 28, 2014 Application for Presidential Permit OE Docket No. PP-395 Emera Maine: Federal Register Notice, Volume 79, No. 81...

  3. Application for presidential permit OE Docket No. PP-334 Energia...

    Broader source: Energy.gov (indexed) [DOE]

    Energia Sierra Juarez U.S Trainsmission LLC More Documents & Publications Application for Presidential Permit OE Docket No. PP-334 Energia Juarez U.S. Transmission, LLC,: Record of...

  4. Application for presidential permit OE Docket No. PP-304 Generadora...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    de C.V. (GDD): Federal Register Notice Volume 71, No. 53 - Mar. 20, 2006 Application for presidential permit OE Docket No. PP-304 Generadora del Desierto SA de C.V. (GDD): Federal...

  5. Application for Presidential Permit OE Docket No. PP-397 Emera...

    Energy Savers [EERE]

    Maine: Federal Register Notice, Volume 79, No. 81 - April 28, 2014 Application for Presidential Permit OE Docket No. PP-397 Emera Maine: Federal Register Notice, Volume 79, No. 81...

  6. Application for Presidential Permit OE Docket No. PP-394 Emera...

    Office of Environmental Management (EM)

    Maine: Federal Register Notice, Volume 79, No. 81 - April 28, 2014 Application for Presidential Permit OE Docket No. PP-394 Emera Maine: Federal Register Notice, Volume 79, No. 81...

  7. Application for presidential permit OE Docket No. PP-304 Generadora...

    Broader source: Energy.gov (indexed) [DOE]

    and maintain electric transmission facilities at the U.S-Mexico border. Application for presidential permit OE Docket No. PP-304 Generadora Del Desierto SA DE CV More Documents &...

  8. Application for presidential permit OE Docket No. PP-371 Northern...

    Office of Environmental Management (EM)

    LLC Application for presidential permit OE Docket No. PP-371 Northern Pass Transmission LLC Pursuant to Executive Order (EO) No. 10485, as amended by EO 12038, and 10 C.F.R. ...

  9. Application for Presidential Permit OE Docket No. PP-396 Emera...

    Office of Environmental Management (EM)

    Maine: Federal Register Notice, Volume 79, No. 81 - April 28, 2014 Application for Presidential Permit OE Docket No. PP-396 Emera Maine: Federal Register Notice, Volume 79, No. 81...

  10. Instream biological assessment of NPDES point source discharges at the Savannah River Site, 1997-1998

    SciTech Connect (OSTI)

    Specht, W.L.

    2000-02-28T23:59:59.000Z

    The Savannah River Site currently has 33 permitted NPDES outfalls that have been permitted by the South Carolina Department of Health an Environmental Control to discharge to SRS streams and the Savannah River. In order to determine the cumulative impacts of these discharges to the receiving streams, a study plan was developed to perform in-stream assessments of the fish assemblages, macroinvertebrate assemblages, and habitats of the receiving streams.

  11. Hanford facility dangerous waste permit application, general information portion

    SciTech Connect (OSTI)

    Hays, C.B.

    1998-05-19T23:59:59.000Z

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report).

  12. Permits

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level:Energy: Grid Integration Redefining What's Possible for RenewableSpeedingBiomassPPPO WebsitePalmsthe PriceOptimizationUSING CRonOther Permits

  13. RADIATION PERMIT APPLICATION Western Human Resources

    E-Print Network [OSTI]

    Sinnamon, Gordon J.

    and Model of Radiation Device (if applicable) Experimental Protocol Describe in detail your experimental the aspects that pertain to safety issues, describe any special hazards, and include the following: 1. Brief will be performed 7. Provide a waste disposal flow chart indicating approx. activities (mCi or MBq) for each type

  14. Combustion turbine emissions issues for air permit applications

    SciTech Connect (OSTI)

    Macak, J.J. III; Schott, G.A. [Westinghouse Electric Corp., Orlando, FL (United States). Power Generation Projects Division

    1994-12-31T23:59:59.000Z

    Power generation from combustion turbines continues to be a significant new energy source. These power projects may be either simple-cycle peaking units or combined-cycle applications in which exhaust heat is recovered to generate steam for export (cogeneration facility) and power generation (steam turbine generator). While combustion turbines represent one of the cleanest forms of power generation, regulatory agencies have identified them as significant sources of air pollution. Both new sources and existing combustion turbine installations are receiving increasing attention at federal, state, and local levels. Before construction can begin on a new combustion turbine facility, an air permit authorizing construction must first be obtained. The air permitting process is generally the ``critical path`` permit, often taking in excess of two years to receive the final approval. The Clean Air Act Amendments of 1990 also impact existing units due to the non-attainment provisions of the Act and the Title 5 nationwide operating permit program. Careful consideration of combustion turbine operational characteristics and air pollutant emissions will expedite air permitting. This paper addresses specific issues related to combustion turbine emissions and the air permitting process. Guidelines for addressing many considerations are provided in order to secure an air permit that allows maximum flexibility in plant operation.

  15. State Waste Discharge Permit application: 200-E Powerhouse Ash Pit

    SciTech Connect (OSTI)

    Atencio, B.P.

    1994-06-01T23:59:59.000Z

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  16. State Waste Discharge Permit application: 200-W Powerhouse Ash Pit

    SciTech Connect (OSTI)

    Atencio, B.P.

    1994-06-01T23:59:59.000Z

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  17. Application for Presidential permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    permit OE Docket No. PP-230-4 International Transmission Company: Response of New York Transmission Owners to ITC Application for Presidential permit OE Docket No....

  18. Application for Presidential Permit OE Docket No. PP-399 MATL LLP

    Broader source: Energy.gov [DOE]

    Application to rescind Presidential Permit held byMontana Alberta Tie Ltd.and issue a permit to MATL covering the same international transmission facilities.

  19. Application for a Presidential Permit OE Docket No. PP-362 Champlain...

    Office of Environmental Management (EM)

    a Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc. Application for a Presidential Permit OE Docket No. PP-362 Champlain Hudson Power Express, Inc....

  20. Application for a Presidential Permit OE Docket No. PP-362 Champlain...

    Broader source: Energy.gov (indexed) [DOE]

    canada Border. Amendment to Presidential Permit Application Letter. LetterPermitAmendmentof28Feb12.pdf More Documents & Publications EIS-0447: Amended Notice of Intent to...

  1. State Waste Discharge Permit application, 100-N Sewage Lagoon

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). This document constitutes the State Waste Discharge Permit application for the 100-N Sewage Lagoon. Since the influent to the sewer lagoon is domestic waste water, the State Waste Discharge Permit application for Public Owned Treatment Works Discharges to Land was used. Although the 100-N Sewage Lagoon is not a Public Owned Treatment Works, the Public Owned Treatment Works application is more applicable than the application for industrial waste water. The 100-N Sewage Lagoon serves the 100-N Area and other Hanford Site areas by receiving domestic waste from two sources. A network of sanitary sewer piping and lift stations transfers domestic waste water from the 100-N Area buildings directly to the 100-N Sewage Lagoon. Waste is also received by trucks that transport domestic waste pumped from on site septic tanks and holding tanks. Three ponds comprise the 100-N Sewage Lagoon treatment system. These include a lined aeration pond and stabilization pond, as well as an unlined infiltration pond. Both piped-in and trucked-in domestic waste is discharged directly into the aeration pond.

  2. State waste discharge permit application, 200-E chemical drain field

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  3. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    SciTech Connect (OSTI)

    Not Available

    1994-06-01T23:59:59.000Z

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  4. State Waste Discharge Permit Application: Electric resistance tomography testing

    SciTech Connect (OSTI)

    Not Available

    1994-04-01T23:59:59.000Z

    This permit application documentation is for a State Waste Discharge Permit issued in accordance with requirements of Washington Administrative Code 173-216. The activity being permitted is a technology test using electrical resistance tomography. The electrical resistance tomography technology was developed at Lawrence Livermore National Laboratory and has been used at other waste sites to track underground contamination plumes. The electrical resistance tomography technology measures soil electrical resistance between two electrodes. If a fluid contaminated with electrolytes is introduced into the soil, the soil resistance is expected to drop. By using an array of measurement electrodes in several boreholes, the areal extent of contamination can be estimated. At the Hanford Site, the purpose of the testing is to determine if the electrical resistance tomography technology can be used in the vicinity of large underground metal tanks without the metal tank interfering with the test. It is anticipated that the electrical resistance tomography technology will provide a method for accurately detecting leaks from the bottom of underground tanks, such as the Hanford Site single-shell tanks.

  5. PRESIDENTIAL PERMIT APPLICATION FOR THE UNITED STATES DEPARTMENT OF ENERGY

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaeferAprilOverviewEfficiencyofHSSPIA - I-ManageMisusePERMIT APPLICATION FOR THE

  6. Application for Special Use Parking Permit Parking and Transportation Services EMPLOYEES ONLY

    E-Print Network [OSTI]

    de Lijser, Peter

    Application for Special Use Parking Permit Parking and Transportation Services EMPLOYEES ONLY (657 CHAIR/ DIRECTOR NAME CSUF EMAIL ADDRESS DAY PHONE # DEPARTMENT Individual Special Permit Department "Shared Use" Special Permit Please provide a written explanation of the purpose for the Special Use Permit

  7. Community Charter Halibut Permit Application Page 1 of 5

    E-Print Network [OSTI]

    PERMIT (CCHP) U.S. Department of Commerce NOAA National Marine Fisheries Service Alaska Region Restricted

  8. Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4

    E-Print Network [OSTI]

    Application for Replacement of Certificates, Permits, or Licenses Page 1 of 4 Revised: 12/10/2012 OMB Control No. 0648-0272 Expiration Date: 11/30/2015 APPLICATION FOR REPLACEMENT OF CERTIFICATES ­ REPLACEMENT REQUEST (Check Only the Items That Apply) PART I ­ BSAI Crab Permits and Scallop Permits [ ] Crab

  9. Application for Presidential Permit OE Doc. No. PP-399 MATL LLP...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presidential Permit OE Doc. No. PP-399 MATL LLP: Federal Register Notice, Volume 79, No. 93 - May 14, 2014 Application for Presidential Permit OE Doc. No. PP-399 MATL LLP: Federal...

  10. Application for presidential permit OE Docket No. PP-235-1 Sempra...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    presidential permit OE Docket No. PP-235-1 Sempra Energy Resources and Termoelectrica U.S LLC Application for presidential permit OE Docket No. PP-235-1 Sempra Energy Resources and...

  11. NPDES Individual Permit for Industrial Facilities - Mail Merge...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    WATER DISCHARGES ASSOCIATED WITH INDUSTRIAL ACTIVITY FROM FABRICATED METAL PRODUCTS INDUSTRY......44 I. CONTENTS OF PLAN. ......

  12. Hawaii National Pollutant Discharge Elimination System (NPDES) Permit

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetec AG|Information OpenEI Reference

  13. EPA - NPDES Permit Writers Manual | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model,DOE FacilityDimondale,South, NewDyer County,ECO2Ltd Place:Notice of IntentWriters

  14. EPA Region 6 NPDES General Permits | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model,DOE FacilityDimondale,South, NewDyer County,ECO2LtdLegalClassRainfall

  15. Oregon Directive for NPDES Permits and Section 401 Water Quality

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri: EnergyExcellenceOfficeOhio:OpowerOrchardCity,Protectio

  16. Vermont NPDES Stormwater Permit Project Risk Evaluation | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga,planning methodologiesVenkataraya| Open EnergyInformation Vermont

  17. EPA - NPDES Permit Program webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualPropertyd8c-a9ae-f8521cbb8489 No revision| Open Jump to: navigation, searchEMC3,webpage |

  18. Application for presidential permit OE Docket No. PP-362 Champlain...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    presidential permit OE Docket No. PP-362 Champlain Hudson - Notice of Intent To Prepare an Environmental Impact Statement: Federal Register Notice Volume 75, No. 117 - Jun. 18,...

  19. Application for Presidential Permit OE Docket No. PP-398 Minnesota...

    Broader source: Energy.gov (indexed) [DOE]

    assess the potential environmental impacts from its proposed federal action of granting a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new...

  20. Application for Presidental Permit OE Docket No. PP-230-4 Internationa...

    Office of Environmental Management (EM)

    Supplemental Filing - Extension of Comments: Federal Register Notice Volume 76, No. 187 - Sep. 27, 2011 Application for Presidental Permit OE Docket No. PP-230-4 International...

  1. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    Late Motion to Intervene of New York Transmission Owners Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to...

  2. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    Letter from New York Transmission Owners Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Letter from New York Transmission Owners...

  3. Application for Presidential Permit OE Docket No. PP-230-3 Internation...

    Office of Environmental Management (EM)

    ITCTransmission Application for presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC Holdings Corporation Limited Partnership, International Transmission Company, and DTE...

  4. Application for presidential permit OE Docket No. PP-230-2 and...

    Office of Environmental Management (EM)

    presidential permit OE Docket No. PP-230-2 and PP-230-3 ITC Holdings Corporation Limited Partnership, International Transmission Company, and DTE Energy Company Application for...

  5. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    Response to Late Motion to Intervene from FirstEnergy Service Corporation Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to...

  6. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    from PJM Interconnection LLC Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene from PJM...

  7. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Filing: Federal Register Notice Volume 76, No. 164 - Aug. 24, 2011 Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company - Notice of...

  8. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    Petition to Intervene and Comments of Baltimore Gas and Electric Company Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Out of Time...

  9. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Comment, American Municipal Power and Old Dominion Electric Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Petition to...

  10. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intervene and Request for Comment Period for NYISO Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Intervene and Request for Comment...

  11. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comments of the Midwest Independent Transmission System Operator Application for presidential permit OE Docket No. PP-230-4 International Transmission Company:...

  12. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Federal Register Notice Volume 74, No. 26 - Feb. 10, 2009 Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Federal Register Notice...

  13. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Broader source: Energy.gov (indexed) [DOE]

    Out of Time of The Detriot Edison Company More Documents & Publications Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to...

  14. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    Comments of the Public Utilities Commission of Ohio Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Comments of the Public Utilities...

  15. Application for Presidential permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    Company: Comments of the Independent Electricity System Operator Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments of...

  16. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    of Comments: Federal Register Notice Volume 76, No. 204 - Oct. 21, 2011 Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company:...

  17. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Broader source: Energy.gov (indexed) [DOE]

    and maintain electric transmission facilities at the U.S-Canada border. Application for presidential permit OE Docket No. 230-4 International Transmission Company More Documents...

  18. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Comments of BGE on Supplemental Filing Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Comments of BGE on Supplemental Filing...

  19. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    American Municipal Power, Inc. and Old Dominion Electric Cooperative Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to...

  20. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    and Comments Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Response to Late Motion to Intervene and Comments Answer of...

  1. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    Supplemental Comments of the Independent Electricity System Operator Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Supplemental...

  2. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Reply Comments Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Reply Comments Reply Comments of International Transmission Company in...

  3. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Comment on behalf of The Public Utilities Commission of Ohio Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: Motion to...

  4. Effect of Title V air permitting on pipeline operations

    SciTech Connect (OSTI)

    Bost, R.C.; Donnan, G.T. [ERM-Southwest, Inc., Houston, TX (United States)

    1995-12-31T23:59:59.000Z

    Pursuant to the passage of the Clean Air Act Amendments of 1990, the US Environmental Protection Agency has promulgated what are known as Title V permitting requirements for major sources of air pollutants, including pipeline operations. In contrast to most existing air permitting programs, the new Title V regulations will require periodic certification of compliance with applicable air regulations. In the same way that water dischargers report their own discharge violations to regulatory agencies pursuant to the NPDES permitting system, Title V permittees must implement an acceptable monitoring program and similarly report violations of permit conditions or applicable air regulations. Only those facilities whose potential emissions are less than or can be controlled to be less than certain regulatory limits will be exempt from standard Title V permitting. If a facility`s throughput or the concentration levels of certain volatile toxic levels in a particular crude or natural gas were to exceed corresponding regulatory limits, then the facility could be in violation. If an operator were to expand a field, then the changes in the gathering system and emission levels could constitute a violation. Constraints on operations can be avoided by careful strategizing of an operator`s Title V permit application.

  5. Experience in automating the Title V permit application

    SciTech Connect (OSTI)

    Ashcraft, T. [Warren Petroleum Co., Tulsa, OK (United States); O`Brien, J. [Process Data Control Corp., Dallas, TX (United States)

    1995-12-31T23:59:59.000Z

    Title V of the Clean Air Act Amendments of 1990 requires that the owners and operators of certain types of industrial plants obtain a federal operating permit. In general, any plant that meets the definition of a major source must either obtain a Title V Operating permit, or take actions to ``act out`` of the Title V program. This Technical Paper describes the experience of the authors in designing and implementing a computer system for data management and reporting of Clean Air Act Title V Permit information. Recommendations are also provided to guide companies and industry groups who are planning to undertake similar automation projects.

  6. Subsistence Halibut Special Permits Application Page 1 of 8

    E-Print Network [OSTI]

    ___________________________________ BLOCK B -- SUBSISTENCE HALIBUT COMMUNITY HARVEST (CHP) PERMIT NOTE: Attach any previously issued CHP harvest logs 1. Name of Alaska Native Tribe or Community 2. Name of CHP Coordinator (First, Middle, Last

  7. Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility

    SciTech Connect (OSTI)

    Not Available

    1993-08-01T23:59:59.000Z

    The 200 Area Effluent Treatment Facility Dangerous Waste Permit Application documentation consists of both Part A and a Part B permit application documentation. An explanation of the Part A revisions associated with this treatment and storage unit, including the current revision, is provided at the beginning of the Part A section. Once the initial Hanford Facility Dangerous Waste Permit is issued, the following process will be used. As final, certified treatment, storage, and/or disposal unit-specific documents are developed, and completeness notifications are made by the US Environmental Protection Agency and the Washington State Department of Ecology, additional unit-specific permit conditions will be incorporated into the Hanford Facility Dangerous Waste Permit through the permit modification process. All treatment, storage, and/or disposal units that are included in the Hanford Facility Dangerous Waste Permit Application will operate under interim status until final status conditions for these units are incorporated into the Hanford Facility Dangerous Waste Permit. The Hanford Facility Dangerous Waste Permit Application, 200 Area Effluent Treatment Facility contains information current as of May 1, 1993.

  8. Recycled Water Reuse Permit Renewal Application for the Central Facilities Area Sewage Treatment Plant

    SciTech Connect (OSTI)

    Mike Lewis

    2014-09-01T23:59:59.000Z

    This renewal application for a Recycled Water Reuse Permit is being submitted in accordance with the Idaho Administrative Procedures Act 58.01.17 Recycled Water Rules and the Municipal Wastewater Reuse Permit LA-000141-03 for continuing the operation of the Central Facilities Area Sewage Treatment Plant located at the Idaho National Laboratory. The permit expires March 16, 2015. The permit requires a renewal application to be submitted six months prior to the expiration date of the existing permit. For the Central Facilities Area Sewage Treatment Plant, the renewal application must be submitted by September 16, 2014. The information in this application is consistent with the Idaho Department of Environmental Qualitys Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater and discussions with Idaho Department of Environmental Quality personnel.

  9. State Waste Discharge Permit application for industrial discharge to land: 200 East Area W-252 streams

    SciTech Connect (OSTI)

    Not Available

    1993-12-01T23:59:59.000Z

    This document constitutes the WAC 173-216 State Waste Discharge Permit application for six W-252 liquid effluent streams at the Hanford Site. Appendices B through H correspond to Section B through H in the permit application form. Within each appendix, sections correspond directly to the respective questions on the application form. The appendices include: Product or service information; Plant operational characteristics; Water consumption and waterloss; Wastewater information; Stormwater; Other information; and Site assessment.

  10. Hanford facility dangerous waste permit application, low-level burial grounds

    SciTech Connect (OSTI)

    Engelmann, R.H.

    1997-08-12T23:59:59.000Z

    The Hanford Facility Dangerous Plaste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the Low-Level Burial Grounds (this document, DOE/RL-88-20).

  11. Application for Presidential Permit OE Docket No. PP-371 Northern...

    Broader source: Energy.gov (indexed) [DOE]

    Application from Northern Pass to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. CLF-AMC-SPNHF Comments on Amended Application (Sept....

  12. U.A.C. R315-3: Application and Permit Procedures for Hazardous...

    Open Energy Info (EERE)

    U.A.C. R315-3: Application and Permit Procedures for Hazardous Waste Treatment, Storage, and Disposal Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library...

  13. Application for Presidential Permit PP-400 TDI-NE - New England...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Comments of the Vermont Department of Public Service - August 6, 2014 Application for Presidential Permit PP-400 TDI-NE - New England Clean Power Link Project - Motion to...

  14. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Broader source: Energy.gov (indexed) [DOE]

    to NISO from MISO and IESO 10-13-11.pdf More Documents & Publications Application for Presidential permit OE Docket No. PP-230-4 International Transmission Company: Comments...

  15. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    PJM Letter filed Dec 8, 2011 in support of Settlement Agreement Application for Presidential Permit OE Docket No. PP-230-4 International Transmission Company: PJM Letter filed Dec...

  16. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Out of Time and Comments of PEPCO Holdings, INC. Application for presidential permit OE Docket No. PP-230-4 International Transmission Company: Petition to Intervene Out of Time...

  17. Amendment 80 Limited Access Fishery Permit Application Page 1 of 6

    E-Print Network [OSTI]

    and complete Amendment 80 Economic Data Report (EDR) for all Amendment 80 QS permits held by that person Ownership BLOCK F -- EDR SUBMISSION Indicate whether the applicant has submitted a timely and complete EDR

  18. WSDE Permit Application Forms webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide Permit webpage Jump to: navigation, search OpenEIPermit

  19. WYDOT Utility Permit Application Form M-54 | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide Permit webpage Jump to: navigation,WSDNR FormsWWTP

  20. Washington Joint Aquatic Resources Permit Application | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy

  1. Montana Water Quality Permit Application, Nondegradation Authorization, and

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant JumpMarysville,Missoula, Montana:Northeast AsiaAir|Underground Storage TanksPermit

  2. Nevada Application for Permit to Appropriate Water | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: EnergyEnergyPPCR) JumpAir Quality Permitting

  3. Construction and Minor Permit Applications | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, clickInformationNew| OpenCongress,Consolidated EdisonMinor Permit

  4. Application for Presidential Permit OE Docket No. PP-400 TDI...

    Energy Savers [EERE]

    to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. PP-400 TDI-New England Application with Appendices.pdf More Documents &...

  5. Early Site Permit Demonstration Program: Siting Guide, Site selection and evaluation criteria for an early site permit application. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-03-24T23:59:59.000Z

    In August 1991, the Joint Contractors came to agreement with Sandia National Laboratories (SNL) and the Department of Energy (DOE) on a workscope for the cost-shared Early Site Permit Demonstration Program. One task within the scope was the development of a guide for site selection criteria and procedures. A generic Siting Guide his been prepared that is a roadmap and tool for applicants to use developing detailed siting plans for their specific region of the country. The guide presents three fundamental principles that, if used, ensure a high degree of success for an ESP applicant. First, the site selection process should take into consideration environmentally diverse site locations within a given region of interest. Second, the process should contain appropriate opportunities for input from the public. Third, the process should be applied so that it is clearly reasonable to an impartial observer, based on appropriately selected criteria, including criteria which demonstrate that the site can host an advanced light water reactor (ALWR). The Siting Guide provides for a systematic, comprehensive site selection process in which three basic types of criteria (exclusionary, avoidance, and suitability) are presented via a four-step procedure. It provides a check list of the criteria for each one of these steps. Criteria are applied qualitatively, as well as presented numerically, within the guide. The applicant should use the generic guide as an exhaustive checklist, customizing the guide to his individual situation.

  6. Regulatory Guidance Letter 88-06 SUBJECT: Nationwide Permit Guidance

    E-Print Network [OSTI]

    US Army Corps of Engineers

    -casting of material that occurs with normal construction practice provided the best management practices at 330.S. The discharge is further limited by 33 CFR 330.6, best management practices, which require the minimization the outfall has an NPDES permit. Section 405 of the Water Quality Act of 1987 exempts storm water outfalls

  7. State waste discharge permit application for cooling water and condensate discharges

    SciTech Connect (OSTI)

    Haggard, R.D.

    1996-08-12T23:59:59.000Z

    The following presents the Categorical State Waste Discharge Permit (SWDP) Application for the Cooling Water and Condensate Discharges on the Hanford Site. This application is intended to cover existing cooling water and condensate discharges as well as similar future discharges meeting the criteria set forth in this document.

  8. General Conditions Applicable to Water Discharge Permits and Procedures and Criteria for Issuing Water Discharge Permits (Connecticut)

    Broader source: Energy.gov [DOE]

    These regulations describe permit and facility requirements for facilities which discharge wastewater. Facility construction, expansion, alteration, production increases, or process modifications...

  9. EPA - Permit Applications and Forms webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model,DOE FacilityDimondale,South, NewDyer County,ECO2Ltd Place:Notice ofApplications

  10. Hanford Facility dangerous waste permit application, liquid effluent retention facility and 200 area effluent treatment facility

    SciTech Connect (OSTI)

    Coenenberg, J.G.

    1997-08-15T23:59:59.000Z

    The Hanford Facility Dangerous Waste Permit Application is considered to 10 be a single application organized into a General Information Portion (document 11 number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the 12 Unit-Specific Portion is limited to Part B permit application documentation 13 submitted for individual, `operating` treatment, storage, and/or disposal 14 units, such as the Liquid Effluent Retention Facility and 200 Area Effluent 15 Treatment Facility (this document, DOE/RL-97-03). 16 17 Both the General Information and Unit-Specific portions of the Hanford 18 Facility Dangerous Waste Permit Application address the content of the Part B 19 permit application guidance prepared by the Washington State Department of 20 Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency 21 (40 Code of Federal Regulations 270), with additional information needs 22 defined by the Hazardous and Solid Waste Amendments and revisions of 23 Washington Administrative Code 173-303. For ease of reference, the Washington 24 State Department of Ecology alpha-numeric section identifiers from the permit 25 application guidance documentation (Ecology 1996) follow, in brackets, the 26 chapter headings and subheadings. A checklist indicating where information is 27 contained in the Liquid Effluent Retention Facility and 200 Area Effluent 28 Treatment Facility permit application documentation, in relation to the 29 Washington State Department of Ecology guidance, is located in the Contents 30 Section. 31 32 Documentation contained in the General Information Portion is broader in 33 nature and could be used by multiple treatment, storage, and/or disposal units 34 (e.g., the glossary provided in the General Information Portion). Wherever 35 appropriate, the Liquid Effluent Retention Facility and 200 Area Effluent 36 Treatment Facility permit application documentation makes cross-reference to 37 the General Information Portion, rather than duplicating text. 38 39 Information provided in this Liquid Effluent Retention Facility and 40 200 Area Effluent Treatment Facility permit application documentation is 41 current as of June 1, 1997.

  11. State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology.

  12. Hanford facility dangerous waste permit application, general information portion. Revision 3

    SciTech Connect (OSTI)

    Sonnichsen, J.C.

    1997-08-21T23:59:59.000Z

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit, which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).

  13. Environmental assessment for presidential permit applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235

    Broader source: Energy.gov [DOE]

    Environmental assessment for presidential permit applications for Baja California Power Inc and Sempra Energy Resources. December 2001 PP-234 and PP-235

  14. Resource Conservation and Recovery Act: Part B Permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 5, Revision 1

    SciTech Connect (OSTI)

    Not Available

    1991-12-31T23:59:59.000Z

    This report, part of the permit application for the WIPP facility, presents engineering drawings and engineering change orders for the facility. (CBS)

  15. State waste discharge permit application: 200 Area Treated Effluent Disposal Facility (Project W-049H)

    SciTech Connect (OSTI)

    Not Available

    1994-08-01T23:59:59.000Z

    As part of the original Hanford Federal Facility Agreement and Concent Order negotiations, US DOE, US EPA and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground to the Hanford Site are subject to permitting in the State Waste Discharge Permit Program (SWDP). This document constitutes the SWDP Application for the 200 Area TEDF stream which includes the following streams discharged into the area: Plutonium Finishing Plant waste water; 222-S laboratory Complex waste water; T Plant waste water; 284-W Power Plant waste water; PUREX chemical Sewer; B Plant chemical sewer, process condensate, steam condensate; 242-A-81 Water Services waste water.

  16. EIS-0336: Presidential Permit Application, Tucson Electric Power Company, Sahuarita, AZ

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to approve a Presidential Permit application to construct a double-circuit 345,000 volt (345-kV) electric transmission line to transmit 500 MW of electricity. The transmission line would begin south of Tucson, Arizona, in the vicinity of Sahuarita, cross the U.S.-Mexico border near Nogales, Arizona, and continue into Mexico. The proponent anticipates using 400 MW of capability for transport of energy between the United States and Mexico.

  17. State waste discharge permit application 400 Area secondary cooling water. Revision 2

    SciTech Connect (OSTI)

    NONE

    1996-01-01T23:59:59.000Z

    This document constitutes the Washington Administrative Code 173-216 State Waste Discharge Permit Application that serves as interim compliance as required by Consent Order DE 91NM-177, for the 400 Area Secondary Cooling Water stream. As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site that affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 of the Washington Administrative Code, the State Waste Discharge Permitting Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order DE 91NM-177. The Consent Order DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. Based upon compositional and flow rate characteristics, liquid effluent streams on the Hanford Site have been categorized into Phase 1, Phase 2, and Miscellaneous streams. This document only addresses the 400 Area Secondary Cooling Water stream, which has been identified as a Phase 2 stream. The 400 Area Secondary Cooling Water stream includes contribution streams from the Fuels and Materials Examination Facility, the Maintenance and Storage Facility, the 481-A pump house, and the Fast Flux Test Facility.

  18. RCRA Part A Permit Application for Waste Management Activities at the Nevada Test Site, Part B Permit Application Hazardous Waste Storage Unit, Nevada Test Site, and Part B Permit Application - Explosives Ordnance Disposal Unit (EODU)

    SciTech Connect (OSTI)

    NSTec Environmental Programs

    2010-06-17T23:59:59.000Z

    The Area 5 Hazardous Waste Storage Unit (HWSU) was established to support testing, research, and remediation activities at the Nevada Test Site (NTS), a large-quantity generator of hazardous waste. The HWSU, located adjacent to the Area 5 Radioactive Waste Management Site (RWMS), is a prefabricated, rigid steel-framed, roofed shelter used to store hazardous nonradioactive waste generated on the NTS. No offsite generated wastes are managed at the HWSU. Waste managed at the HWSU includes the following categories: Flammables/Combustibles; Acid Corrosives; Alkali Corrosives; Oxidizers/Reactives; Toxics/Poisons; and Other Regulated Materials (ORMs). A list of the regulated waste codes accepted for storage at the HWSU is provided in Section B.2. Hazardous wastes stored at the HWSU are stored in U.S. Department of Transportation (DOT) compliant containers, compatible with the stored waste. Waste transfer (between containers) is not allowed at the HWSU and containers remain closed at all times. Containers are stored on secondary containment pallets and the unit is inspected monthly. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational Resource Conservation and Recovery Act (RCRA) units at the NTS and their respective regulatory status.

  19. UM SERVICE VEHICLE PARKING PERMIT APPLICATION Return the completed application to Parking and Transportation Services, 1213 Kipke Dr., 2002, or fax

    E-Print Network [OSTI]

    Kirschner, Denise

    UM SERVICE VEHICLE PARKING PERMIT APPLICATION Return the completed application to Parking vehicles that provide service as stated in the definition below qualify to receive this permit. DEFINITION A service vehicle is any licensed University vehicle, typically a truck or van, whose primary purpose

  20. Hanford facility dangerous waste permit application, 325 hazardous waste treatment units. Revision 1

    SciTech Connect (OSTI)

    NONE

    1997-07-01T23:59:59.000Z

    This report contains the Hanford Facility Dangerous Waste Permit Application for the 325 Hazardous Waste Treatment Units (325 HWTUs) which consist of the Shielded Analytical Laboratory, the 325 Building, and the 325 Collection/Loadout Station Tank. The 325 HWTUs receive, store, and treat dangerous waste generated by Hanford Facility programs. Routine dangerous and/or mixed waste treatment that will be conducted in the 325 HWTUs will include pH adjustment, ion exchange, carbon absorption, oxidation, reduction, waste concentration by evaporation, precipitation, filtration, solvent extraction, solids washing, phase separation, catalytic destruction, and solidification/stabilization.

  1. November 5, 2003 Safety Meeting Present; Lori Parker, Melody Pfister, Bill Hanshumaker, Rick Brown, Dave Johnson,

    E-Print Network [OSTI]

    &S will be letting HMSC use two of their SCBA's for cleaning the reservoir. NPDES permit application is at ODEQ

  2. The National Stormwater Quality Database, Version 1.1 A Compilation and Analysis of NPDES

    E-Print Network [OSTI]

    Pitt, Robert E.

    stormwater permit applications and subsequent permits, during the period of 1992 to 2002. This database channel conveyances. The first phase requirements of the federal stormwater permit program were first,000 in population), while Phase II of the stormwater permit program was applied to all urban areas as of early 2003

  3. 851 S.W. Sixth Avenue, Suite 1100 Steve Crow 503-222-5161 Portland, Oregon 97204-1348 Executive Director 800-452-5161

    E-Print Network [OSTI]

    ­ Site secured with Port of Portland ­ Final Air permit issued ­ Site Certificate Proposed Order issued ­ NPDES Wastewater Discharge Application completed ­ NPDES Construction Stormwater permit issued

  4. Industrial Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Protection Obeying Environmental Laws Industrial Permit Industrial Permit The Industrial Permit authorizes the Laboratory to discharge point-source effluents under the...

  5. Solar Permitting Law (Oregon)

    Broader source: Energy.gov [DOE]

    With the passage of HB 3516 in June 2011, solar permit application approval is a "ministerial function", provided a system meets certain guidelines. To qualify for this simplified permitting...

  6. Application for Presidental Permit OE Docket No. PP-230-4 Internationa...

    Broader source: Energy.gov (indexed) [DOE]

    permit OE Docket No. PP-230-4 International Transmission Company: Supplemental Comments of the Independent Electricity System Operator PP-230-4 International Transmission Company...

  7. Resource Conservation and Recovery Act, Part B permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revision 3

    SciTech Connect (OSTI)

    Not Available

    1993-03-01T23:59:59.000Z

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws.

  8. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site

    SciTech Connect (OSTI)

    NSTec Environmental Protection and Technical Services

    2009-09-30T23:59:59.000Z

    This permit application provides facility information on the design, processes, and security features associated with the proposed Mixed Waste Disposal Unit. The unit will receive and dispose of onsite and offsite containerized low-level mixed waste (LLMW) that has an approved U.S. Department of Energy nexus.

  9. Water pollution Control Permit Fee Schedules (West Virginia)

    Broader source: Energy.gov [DOE]

    This rule establishes schedules of permit application fees and annual permit fees for state water pollution control permits and national pollutant discharge elimination system permits issued by the...

  10. COMMUNICATING THE 2008 NPDES PERMIT What it means for public transportation

    E-Print Network [OSTI]

    Minnesota, University of

    and impaired waters ÿTraining requirements ÿTemporary and Permanent Best management practices (BMP's) ÿPollution prevention practices ÿStabilization ÿThreatened endangered species/cultural resources impacts #12;What-grade. · Removing topsoil/vegetation ­ Widening (turn lanes, shoulders) ­ Clearing & Grubbing ­ New road ­ Storm

  11. AGENDA ADEP Surface Water Protection Project NPDES Storm Water Individual Permit Bi-Annual Update

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del(ANL-IN-03-032)8Li (59AJ76) (See the EnergyTAMANG, APIL.AFT 210XP Nanospec nano.jpg

  12. Hawaii Guidelines for NPDES Notice of General Permit Coverage | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetec AG|Information OpenEI Reference LibraryAdd toInformation Notice

  13. Hawaii NPDES General Permit Notice of Intent Forms Webpage | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetec AG|Information OpenEI Reference LibraryAddHawaiiOpenInformation

  14. O.A.R. 340-045 - Regulations Pertaining to NPDES and WPCF Permits | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri: EnergyExcellence SeedNunn, Colorado:Cables | Open EnergyOpenEnergy

  15. OAR 340-045 - Regulations Pertaining to NPDES and WPCF Permits | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri: EnergyExcellence SeedNunn, Colorado:Cables | Open5-0151-075Energy

  16. Oregon NPDES Storm Water Discharge Permit (DEQ Form 1200-A) | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri:Energy Information Fees for

  17. Title 40 CFR 122 EPA Administered Permit Programs: NPDES | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries PvtStratosolarTharaldson EthanolTillson,OpenOpen EnergyR. 297

  18. Overload permit rules applicable to H-type and HS-type bridges

    E-Print Network [OSTI]

    Litchfield, Stephen Charles

    1994-01-01T23:59:59.000Z

    This document defines standards for issuing permits for overweight vehicles crossing standard H-type and HS-type Texas highway bridges. A general formula and a bridge specific formula have been developed for simple spans of both bridge types...

  19. Post-closure permit application for the Kerr Hollow Quarry at the Y-12 plant

    SciTech Connect (OSTI)

    NONE

    1995-06-01T23:59:59.000Z

    The Kerr Hollow Quarry (KHQ) is located on U.S. Department of Energy (DOE) property at the Y-12 Plant, Oak Ridge, Tennessee. The Oak Ridge Y-12 Plant was built by the U.S. Army Corps of Engineers in 1943 as part of the Manhattan Project. Until 1992, the primary mission of the Y-12 Plant was the production and fabrication of nuclear weapons components. Activities associated with these functions included production of lithium compounds, recovery of enriched uranium from scrap material, and fabrication of uranium and other materials into finished parts for assemblies. The Kerr Hollow Quarry was used for waste disposal of a variety of materials including water-reactive and shock-sensitive chemicals and compressed gas cylinders. These materials were packaged in various containers and sank under the water in the quarry due to their great weight. Disposal activities were terminated in November, 1988 due to a determination by the Tennessee Department of Environment and Conservation that the quarry was subject to regulations under the Resource Conservation and Recovery Act of 1993. Methods of closure for the quarry were reviewed, and actions were initiated to close the quarry in accordance with closure requirements for interim status surface impoundments specified in Tennessee Rules 1200-1-11-.05(7) and 1200-1-11-.05(11). As part of these actions, efforts were made to characterize the physical and chemical nature of wastes that had been disposed of in the quarry, and to remove any containers or debris that were put into the quarry during waste disposal activities. Closure certification reports (Fraser et al. 1993 and Dames and Moore 1993) document closure activities in detail. This report contains the post-closure permit application for the Kerr Hollow Quarry site.

  20. Resource Conservation and Recovery Act: Part B, Permit application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 1, Revison 1.0

    SciTech Connect (OSTI)

    Not Available

    1992-03-01T23:59:59.000Z

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements.

  1. Permit Fees for Hazardous Waste Material Management (Connecticut)

    Broader source: Energy.gov [DOE]

    These regulations describe applicable fees for permit application, modification, and transfer for permits related to hazardous waste management.

  2. Louisiana Title V General Permits

    SciTech Connect (OSTI)

    Boyer, B.E.; Neal, T.L.

    1995-12-31T23:59:59.000Z

    Title V of the Federal Clean Air Act Amendments of 1990 requires federal operating permits for all major sources of air pollution. In 1992, Title 40, Part 70 of the Code of Federal Regulations (40 CFR Part 70) codified the law s requirements. These federal regulations, entitled Operating Permit Program, define the minimum requirements for state administered operating permit programs. The intent of Title V is to put into one document all requirements of an operating permit. General Permits for oil and gas facilities may be preferred if the facility can comply with all permit requirements. If greater flexibility than allowed by the General Permit is required, then the facility should apply for an individual Title V permit. General Permits are designed to streamline the permitting process, shorten the time it takes to obtain approval for initial and modified permits. The advantages of the General Permit include reduced paperwork and greater consistency because the permits are standardized. There should be less uncertainty because permit requirements will be known at the time of application. Approval times for Initial and modified General Permits should be reduced. Lengthy public notice procedures (and possible hearings) will be required for only the initial approval of the General Permit and not for each applicant to the permit. A disadvantage of General Permits is reduced flexibility since the facility must comply with the requirements of a standardized permit.

  3. Recycled Water Reuse Permit Renewal Application for the Materials and Fuels Complex Industrial Waste Ditch and Industrial Waste Pond

    SciTech Connect (OSTI)

    No Name

    2014-10-01T23:59:59.000Z

    ABSTRACT This renewal application for the Industrial Wastewater Reuse Permit (IWRP) WRU-I-0160-01 at Idaho National Laboratory (INL), Materials and Fuels Complex (MFC) Industrial Waste Ditch (IWD) and Industrial Waste Pond (IWP) is being submitted to the State of Idaho, Department of Environmental Quality (DEQ). This application has been prepared in compliance with the requirements in IDAPA 58.01.17, Recycled Water Rules. Information in this application is consistent with the IDAPA 58.01.17 rules, pre-application meeting, and the Guidance for Reclamation and Reuse of Municipal and Industrial Wastewater (September 2007). This application is being submitted using much of the same information contained in the initial permit application, submitted in 2007, and modification, in 2012. There have been no significant changes to the information and operations covered in the existing IWRP. Summary of the monitoring results and operation activity that has occurred since the issuance of the WRP has been included. MFC has operated the IWP and IWD as regulated wastewater land treatment facilities in compliance with the IDAPA 58.01.17 regulations and the IWRP. Industrial wastewater, consisting primarily of continuous discharges of nonhazardous, nonradioactive, routinely discharged noncontact cooling water and steam condensate, periodic discharges of industrial wastewater from the MFC facility process holdup tanks, and precipitation runoff, are discharged to the IWP and IWD system from various MFC facilities. Wastewater goes to the IWP and IWD with a permitted annual flow of up to 17 million gallons/year. All requirements of the IWRP are being met. The Operations and Maintenance Manual for the Industrial Wastewater System will be updated to include any new requirements.

  4. APPLICATION FOR CAR SHARING PARKING PERMIT 2014/15 (EXETER CAMPUSES)

    E-Print Network [OSTI]

    Bearhop, Stuart

    is correct, and that I am the registered keeper of the vehicle(s) detailed above, and I undertake windscreen of my vehicle in accordance with the instructions determined by the University Council To display the permit on the vehicle at all times when it is being used for car sharing purposes whilst

  5. APPLICATION FOR NON UNIVERSITY STAFF CAR PARKING PERMIT 2010 (EXETER CAMPUSES)

    E-Print Network [OSTI]

    Bearhop, Stuart

    : Contact email: Work Address: Parking Permit charges vary according to your vehicle's emissions. Please.exeter.ac.uk/about/parking/wendy/documents/proratarates.pdf. Please tick the appropriate box(es) below. Vehicle Emissions These may be found on your V5 document or by clicking the `vehicle enquiry' button on this website: www.taxdisc.direct.gov.uk I wish to apply

  6. Development of a Clean Air Act Title V permit application for Argonne National Laboratory

    SciTech Connect (OSTI)

    Barrett, G.L.

    1994-06-01T23:59:59.000Z

    The Clean Air Act Amendments (CAAA) of 1990 instituted major changes in the way that air emission sources are regulated and permitted. Along with being a major research and development laboratory owned by the US Department of Energy, Argonne National Laboratory (ANL) is also classified as a major source of oxides of nitrogen (NO{sub x}) in the Chicago metropolitan area which has been designated by the US Environmental Protection Agency (USEPA) as severe (17) for ozone. As a major source ANL is therefore required under Title V of CAAA to apply for a federally enforceable permit for all sources of air emissions at the facility. While the ANL Boiler House represents the most significant emission source at the Laboratory, there are, nevertheless, a large number of other emission sources, some of which are currently permitted by the State of Illinois and others of which are exempt from state permitting requirements. A large number of R & D related sources are of relatively small magnitude. The ability to identify, inventory, characterize and classify all sources under the various titles of CAAA constitutes a major challenge for R & D laboratories of this size.

  7. EIS-0307: Presidential Permit Application, Public Service Company of New Mexico, AZ

    Broader source: Energy.gov [DOE]

    This EIS analyzes DOE's decision to approve the Public Service Company of New Mexico (PNM) for a Presidential permit to construct two transmission lines originating at the switchyard of the Palo Verde Nuclear Generating Station (PVNGS) near Phoenix, Arizona, and extending approximately 160 miles to the south along one of three alternative routes, where they would cross the United States (U.S.) border with Mexico in the vicinity of Nogales, Arizona.

  8. Hanford facility dangerous waste Part A, Form 3 and Part B permit application documentation, Central Waste Complex (WA7890008967)(TSD: TS-2-4)

    SciTech Connect (OSTI)

    Saueressig, D.G.

    1998-05-20T23:59:59.000Z

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating, treatment, storage, and/or disposal units, such as the Central Waste Complex (this document, DOE/RL-91-17). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the Central Waste Complex permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the Central Waste Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this Central Waste Complex permit application documentation is current as of May 1998.

  9. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Chapter D, Appendix D1 (conclusion): Volume 3, Revision 1.0

    SciTech Connect (OSTI)

    Not Available

    1992-06-01T23:59:59.000Z

    This report, Part B (Vol. 3) of the permit application for the WIPP facility, contains information related to the site characterization of the facility, including geology, design, rock salt evaluations, maps, drawings, and shaft excavations. (CBS)

  10. DOE Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235: Finding of No Significant Impact

    Broader source: Energy.gov [DOE]

    The Department of Energy has determined in its Environmental Assessment EA-1391 for Presidential Permit Applications for Baja California Power Inc and Sempra Energy Resources PP-234 and PP-235 a...

  11. Resource Conservation and Recovery Act, Part B Permit Application [of the Waste Isolation Pilot Plant (WIPP)]. Volume 2, Revision 1.0

    SciTech Connect (OSTI)

    Not Available

    1990-12-31T23:59:59.000Z

    This report, Part B ( Vol. 2) of the permit application for the WIPP facility, contains information related to the WIPP site on hydrology, geology, maps, and rock salt properties.

  12. EIS-0414: Presidential Permit Application, Energia Sierra Juarez Transmission Line, California

    Broader source: Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts from DOEs proposed Federal action of granting a Presidential permit to Energia Sierra Juarez U.S. Tranmssion, LLC (ESJ-U.S.), a subsidiary of Sempra Generation, to construct, operate, maintain, and connect a 1.7-mile transmission line (0.65 miles in the U.S.) across the international border between the U.S. and Mexico, near the town of Jacumba, California. The County of San Diego is a cooperating agency in the preparation of this EIS.

  13. Appendix F: NPDES Noncompliances Annual Site Environmental Report

    E-Print Network [OSTI]

    Pennycook, Steve

    in the water received by Y-12, (2) rapidly fluctuating quantities of residual chlorine in the raw water and cooling exceedence exceeded the daily maximum water source were removed. The permit limit of 0.5 mg investigation identified the source than permit limits. as a water heater in the Building 9723-33 changehouse

  14. Portland's Residential Solar Permitting Guide

    Broader source: Energy.gov [DOE]

    This program guide outlines the application and review procedures for obtaining the necessary permit(s) to install a solar energy system for a new or existing residential building. The guide also...

  15. Application for Presidential Permit OE Docket No. PP-230-4 Internation...

    Office of Environmental Management (EM)

    No. PP-230-4 International Transmission Company: Comments from NYISO Comments of the New York Independent System Operator on the application from International Transmission...

  16. Application for presidential permit OE Docket No. PP-230-4 Internation...

    Broader source: Energy.gov (indexed) [DOE]

    New York Independent System Operator on the application from International Transmission Company to construct, operate, and maintain electric transmission facilities at the...

  17. Operating Permits and Emission Fees (New Mexico)

    Broader source: Energy.gov [DOE]

    The New Mexico Environment Department's Air Quality Bureau processes permit applications for industries that emit pollutants to the air. The Permitting Section consists of three units, the Minor...

  18. RCRA Part B Permit Application for the Idaho National Engineering Laboratory - Volume 5 Radioactive Waste Management Complex

    SciTech Connect (OSTI)

    Pamela R. Cunningham

    1992-07-01T23:59:59.000Z

    This section of the Radioactive Waste Management Complex (RWMC) Part B permit application describes the waste characteristics Of the transuranic (TRU) mixed wastes at the RWMC waste management units to be permitted: the Intermediate-Level Transuranic Storage Facility (ILTSF) and the Waste Storage Facility (WSF). The ILTSF is used to store radioactive remote-handled (RH) wastes. The WSF will be used to store radioactive contact-handled (CH) wastes. The Transuranic Storage Area (TSA) was established at the RWMC to provide interim storage of TRU waste. Department of Energy (DOE) Order 5820.2A defines TRU waste as waste contaminated with alpha-emitting transuranium radionuclides with half-lives greater than 20 years in concentrations greater than 100 nanocuries per gram (nCi/g) o f waste material. The TSA serves generators both on and off the Idaho National Engineering Laboratory (INEL). The ILTSF is located at the TSA, and the WSF will be located there also. Most of the wastes managed at the TSA are mixed wastes, which are radioactive wastes regulated under the Atomic Energy Act (AEA) that also contain hazardous materials regulated under the Resource Conservation and Recovery Act (RCRA) and the Idaho Hazardous Waste Management Regulations. These wastes include TRU mixed wastes and some low-level mixed wastes. Accordingly, the TSA is subject to the permitting requirements of RCRA and the Idaho Administrative Procedures Act (IDAPA). Prior to 1982, DOE orders defined TRU wastes as having transuranium radionuclides in concentrations greater than 10 nCi/g, The low-level mixed wastes managed at the TSA are those wastes with 10 to 100 nCi/g of TRU radionuclides that prior to 1982 were considered TRU waste.

  19. Application to Amend Presidential Permit OE Docket No. PP-022-4 British

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011AT&T, Inc.'s ReplyApplication of Synthetic Diesel Fuels Application of

  20. State waste discharge permit application for the 200 Area Effluent Treatment Facility and the State-Approved Land Disposal Site

    SciTech Connect (OSTI)

    Not Available

    1993-08-01T23:59:59.000Z

    Application is being made for a permit pursuant to Chapter 173--216 of the Washington Administrative Code (WAC), to discharge treated waste water and cooling tower blowdown from the 200 Area Effluent Treatment Facility (ETF) to land at the State-Approved Land Disposal Site (SALDS). The ETF is located in the 200 East Area and the SALDS is located north of the 200 West Area. The ETF is an industrial waste water treatment plant that will initially receive waste water from the following two sources, both located in the 200 Area on the Hanford Site: (1) the Liquid Effluent Retention Facility (LERF) and (2) the 242-A Evaporator. The waste water discharged from these two facilities is process condensate (PC), a by-product of the concentration of waste from DSTs that is performed in the 242-A Evaporator. Because the ETF is designed as a flexible treatment system, other aqueous waste streams generated at the Hanford Site may be considered for treatment at the ETF. The origin of the waste currently contained in the DSTs is explained in Section 2.0. An overview of the concentration of these waste in the 242-A Evaporator is provided in Section 3.0. Section 4.0 describes the LERF, a storage facility for process condensate. Attachment A responds to Section B of the permit application and provides an overview of the processes that generated the wastes, storage of the wastes in double-shell tanks (DST), preliminary treatment in the 242-A Evaporator, and storage at the LERF. Attachment B addresses waste water treatment at the ETF (under construction) and the addition of cooling tower blowdown to the treated waste water prior to disposal at SALDS. Attachment C describes treated waste water disposal at the proposed SALDS.

  1. Portland's Commercial Solar Permitting Guide

    Broader source: Energy.gov [DOE]

    This program guide outlines the application and review procedures for obtaining the necessary permits to install a solar energy system on a new or existing commercial building.

  2. UNIQUE APPROACH TO COMPLYING WITH VERY LOW NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT LIMITS FOR COPPER

    SciTech Connect (OSTI)

    Payne, B.; Halverson, N.; Looney, B.; Millings, M.; Nichols, R.; Noonkester, J.

    2011-03-15T23:59:59.000Z

    The NPDES permit issued to the Savannah River Site (SRS) in 2003 contained copper limits as low as six micrograms per liter. It also contained compliance schedules that provided SRS with anywhere from three to five years to select and implement projects that would enable compliance at several outfalls. Some outfall problems were much more difficult to correct than others. SRS personnel implemented several innovative projects in order to meet compliance schedule deadlines as inexpensively as possible. One innovation, constructing a humic acid feed system to increase effluent dissolved organic carbon (DOC) content, has proven to be very successful.

  3. Renewal Application

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Renewal Individual Permit Renewal Application The Permit expires March 31, 2014 and existing permit conditions will be in effect until a new permit is issued. The Permittees...

  4. Addendum to the post-closure permit application for the Bear Creek hydrogeologic regime at the Y-12 plant: Walk-in pits

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    In June 1987, the Resource Conservation and Recovery Act (RCRA) Closure/Post-Closure Plan for the Bear Creek Burial Grounds (BCBG) located at the Y-12 Plant on the Oak Ridge Reservation in Oak Ridge, Tennessee was submitted to the Tennessee Department of Environment and Conservation (TDEC) for review and approval.The Closure Plan has been modified and revised several times. This document is an addendum to the Post-Closure Permit Application submitted to TDEC in June, 1994. This addendum contains information on the Walk-In Pits of the BCBG which is meant to supplement the information provided in the Post-Closure Permit Application submitted for the BCBG. This document is not intended to be a stand-alone document.

  5. Connecticut Rooftop Solar PV Permitting Guide

    Broader source: Energy.gov [DOE]

    The Connecticut Rooftop Solar PV Permitting Guide is a compilation of best practices and resources for solar PV permitting. The guide includes a summary of current codes and regulations affecting solar PV, best practices for streamlining the municipal permitting process, and tools to assist municipalities in creating a streamlined permit process for residential solar PV. Resources include a solar PV permit application, a structural review worksheet, an inspection checklist, and a model solar zoning ordinance.

  6. Water Permits (Louisiana)

    Broader source: Energy.gov [DOE]

    The Water Permits Division authorizes permits administered under the Water Quality Regulations. Louisiana's Water Quality Regulations require permits for the discharge of pollutants from any point...

  7. RCRA Part A and Part B Permit Application for Waste Management Activities at the Nevada Test Site: Proposed Mixed Waste Disposal Unit (MWSU)

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2010-07-19T23:59:59.000Z

    The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When the proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.

  8. Resource Management Services: Water Regulation, Part 600: Applications for Licenses and Preliminary Permits Under the Water Power Act (New York)

    Broader source: Energy.gov [DOE]

    These regulations provide instructions for applications proposing the construction, repair, or operation of hydropower sources. Applications are reviewed by the Water Power and Control Commission.

  9. Annual Hanford Site Environmental Permitting status report

    SciTech Connect (OSTI)

    SONNICHSEN, J.C.

    1999-10-18T23:59:59.000Z

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

  10. Environmental Assessment and Finding of No Significant Impact: Presidential Permit Applications for Baja California Power, Inc. and Sempra Energy Resources

    SciTech Connect (OSTI)

    N /A

    2001-12-05T23:59:59.000Z

    In separate actions, Sempra Energy Resources (SER) and Baja California Power, Inc. (BCP) have applied to the US Department of Energy (DOE) for Presidential permits pursuant to Executive Order (EO) No. 10485, as amended by EO 12038, and 10 CFR Section 205.320 et seq. (2000), to construct, operate, maintain, and connect electric power transmission facilities crossing the international border between the Us and Mexico. SER and BCP each propose constructing separate new double-circuit, 230,000 volt (230 kV) transmission lines extending about six miles south from the Imperial Valley Substation (IV Substation), owned and operated by San Diego Gas and Electric Company (SDG and E), to the US/Mexico international border. In each case, the objective is to connect the proposed transmission lines to natural gas fueled electric generating plants being constructed in Mexico for the purpose of importing electrical power into the US onto the southern California electrical grid. The proposed transmission lines would traverse about six miles of federal land administered by the US Department of the Interior's Bureau of Land Management (BLM).

  11. Annual Hanford Site Environmental Permitting Status Report

    SciTech Connect (OSTI)

    HOMAN, N.A.

    2000-10-01T23:59:59.000Z

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year.

  12. Presidential Permits | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Presidential Permits Below is a listing of all the presidential permits grouped by Canada and Mexico. View the Presidental Permits - Mexico View the Presidential Permits -...

  13. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    SciTech Connect (OSTI)

    Not Available

    1994-05-01T23:59:59.000Z

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analyses and forms, inspection logs, equipment identification, etc.

  14. Federal Environmental Permitting Handbook. Environmental Guidance

    SciTech Connect (OSTI)

    Not Available

    1991-05-01T23:59:59.000Z

    The handbook consists of eight chapters addressing permitting and licensing requirements under the Resource Conservation and Recovery Act (RCRA), the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended by the Superfund Amendments and Reauthorization Act of 1986 (CERCLA/SARA), the Atomic Energy Act (AEA), the Clean Air Act (CAA), the Clean Water Act (CWA), the Federal Insectide, Fungicide, and Rodenticide Act (FIFRA), the Safe Drinking Water Act (SDWA), and the Toxic Substances Control Act (TSCA). Each chapter consists of: (1) an introduction to the statute and permitting requirements; (2) a diagram illustrating the relationship between permitting requirements under the statute being discussed and permitting requirements from other environmental statutes which may have to be addressed when applying for a particular permit (e.g., when applying for a RCRA permit, permits and permit applications under the CWA, CAA, SDWA, etc. would have to be listed in the RCRA permit application); and, (3) a compilation of the permitting requirements for the regulatory program resulting from the statute. In addition, the Handbook contains a permitting keyword index and a listing of hotline telephone numbers for each of the statutes.

  15. DISCOUNTED EVENT PERMIT REQUEST

    E-Print Network [OSTI]

    DISCOUNTED EVENT PERMIT REQUEST Discounted daily parking rates are available for CSM events where or the daily scratch off permits: COMMUTER LOTS: $3.00 / day GENERAL LOTS: $4.00 / day Please e-mail or drop

  16. Solar Construction Permitting Standards

    Broader source: Energy.gov [DOE]

    Owners of solar photovoltaic (PV) systems and solar water heating systems in Colorado are required to obtain a building permit before their systems may be installed. Permits are handled at the l...

  17. Solar Construction Permitting Standards

    Broader source: Energy.gov [DOE]

    Owners of solar photovoltaic (PV) systems and solar water heating systems in Arizona are required to obtain a building permit before their systems may be installed. Permits are handled at the...

  18. Air permitting guidelines for combustion turbine projects

    SciTech Connect (OSTI)

    Macak, J.J. III [Mostardi-Platt Associates, Inc., Elmhurst, IL (United States); Schott, G.A. [Westinghouse Electric Corp., Orlando, FL (United States). Power Generation Business Unit

    1997-09-01T23:59:59.000Z

    Before construction can begin on a new combustion turbine facility, an air permit must be obtained. The air permitting process is generally the critical path permit, often taking in excess of one year to receive final approval. Careful consideration and understanding of combustion turbine operational characteristics and air pollutant emissions will expedite the air permitting process. The purpose of this paper is to identify key issues related to combustion turbine operation that will aid in the preparation of air permit applications. However, before applying for an air permit, a pre-application meeting should be held with the regulatory agency to present an overview of the proposed project, as well as develop the requisite protocols to begin the process.

  19. Prevention of significant deterioration permit application for the Fueled Clad Fabrication System, the Radioisotope Power Systems Facility, and the Fuel Assembly Area

    SciTech Connect (OSTI)

    Not Available

    1989-08-01T23:59:59.000Z

    This New Source Review'' has been submitted by the US Department of Energy-Richland Operations Office (PO Box 550, Richland, Washington 99352), pursuant to WAC 173-403-050 and in compliance with the Department of Ecology Guide to Processing A Prevention Of Significant Deterioration (PSD) Permit'' for three new sources of radionuclide emissions at the Hanford Site in Washington State. The three new sources, the Fueled Clad Fabrication System (FCFS), the Radioisotope Power Systems Facility (RPSF), and the Fuel Assembly Area (FAA), will be located in one facility, the Fuels and Materials Examination Facility (FMEF) of the 400 Area. The FMEF was originally designed to provide for post-irradiation examination and fabrication of breeder reactor fuels. These FMEF missions were cancelled before the introduction of any fuel materials or any irradiated material. The current plans are to use the facility to fabricate power supplies for use in space applications and to produce Fast Flux Test Facility (FFTF) fuel and target assemblies. The FCFS and the RPSF will produce materials and assemblies for application in space. The FAA project will produce FFTF fuel and target assemblies. The FCFS and the RPSF will share the same building, stack, and, in certain cases, the same floor space. Given this relationship, these systems will be dealt with separately to the extent possible. The FAA is a comparatively independent operation though it will share the FMEF complex.

  20. Hazardous Waste Transporter Permits (Connecticut)

    Broader source: Energy.gov [DOE]

    Transportation of hazardous wastes into or through the State of Connecticut requires a permit. Some exceptions apply. The regulations provide information about obtaining permits and other permit...

  1. Addendum to the post-closure permit application for the Bear Creek Hydrogeologic Regime at the Y-12 Plant: Walk-in pits. Revision 2

    SciTech Connect (OSTI)

    NONE

    1995-04-01T23:59:59.000Z

    The revised Closure Plan was initially intended to apply to A Area, C-West, B Area, and the Walk-In Pits (WIPs) of the Bear Creek Burial Grounds (BCBG). However, a strategy was developed to include the B Area [a solid waste management unit (SWMU)] with the WIPs so that both areas would be closed under one cap. The plan was presented to the State of Tennessee on March 8, 1990, and the Department of Energy was requested to review other unique alternatives to close the site. Therefore, in November 1992, the Closure Plan for B Area and the WIPs was prepared separately from that of the other sites associated with the BCBG and was presented in a RCRA Closure Plan. The Closure Plan revision issued April 1993 was intended to reflect the placement of the Kerr Hollow Quarry debris at the WIPs, revise the closure data, and acknowledge that the disposition of a monitoring well within the closure site could not be verified. A Post-Closure Permit Application (PCPA) was to include the WIPs; however, at the time of submittal, closure of the WIPs had not been certified. This addendum contains information on the WIPs to accompany the BCBG PCPA. The purpose of this document is to supplement the information provided in the BCBG PCPA. This document is not intended to be a stand-alone document. Only additional information regarding the WIPs is included in the sections of this document, which correspond to sections of the PCPA submitted in June 1994.

  2. Has operating permitting really changed with Title V? Reflecting on the Title V operating permit program

    SciTech Connect (OSTI)

    Goldstein, D.R.; Cressman, A.W.

    1999-07-01T23:59:59.000Z

    Now that some state regulatory agencies are reviewing Title V permit applications and issuing permits, evaluation of the process can be made in comparison with the original goals of the Title V permitting program. In addition, assessment of the terms and conditions that are being incorporated into permits, the nature of draft permits that are issued to facilities for comment, and the extent and type of negotiation that have been conducted with agencies to develop successful Title V permits, will be helpful for facilities that are currently undergoing application review. In working with a Fortune 500 surface coating company, fourteen Title V permit applications were developed and submitted for plants located in Maryland, Pennsylvania, Ohio, New Jersey, Illinois, Georgia, West Virginia, Wisconsin, Indiana and southern California. Draft permits have been issued for several of the plants, and differences in the terms and conditions, testing requirements, and permit format and structure have been noted between states. One of the issued permits required modification, and the process was one of the first for this state agency.

  3. Stormwater Permits (Vermont)

    Broader source: Energy.gov [DOE]

    Stormwater permits are required for the construction of a new generation facility, the reconstruction or expansion of a facility, the operation of a generation facility which discharges stormwater...

  4. CCS Project Permit Acquisition Protocols

    SciTech Connect (OSTI)

    Lee, Si-Yong; Zaluski, Wade; Matthews, Vince; McPherson, Brian

    2013-06-30T23:59:59.000Z

    Geologic carbon storage projects require a vast range of permits prior to deployment. These include land-access permits, drilling permits, seismic survey permits, underground injection control permits, and any number of local and state permits, depending on the location of the project. For the Characterization of Most Promising Sequestration Formations in the Rocky Mountain Region (RMCCS) project in particular, critical permits included site access permits, seismic survey permits, and drilling permits for the characterization well. Permits for these and other activities were acquired either prior to or during the project.

  5. Annual Hanford Site environmental permitting status report

    SciTech Connect (OSTI)

    Sonnichsen, J.C.

    1998-09-17T23:59:59.000Z

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for the Hanford Facility is addressed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Pursuant to the Tri-Party Agreement, a single RCRA permit was issued by Ecology and the EPA to cover the Hanford Facility. The RCRA Permit, through the permit modification process, eventually will incorporate all TSD units.

  6. University Food Permit For Serving Food or Refreshments on University Property

    E-Print Network [OSTI]

    Amin, S. Massoud

    University Food Permit For Serving Food or Refreshments on University Property Not Required__________________________________________ Date ___________________ When applicable, this permit must be reviewed by the Environmental Hygiene only) #12;Caterer/Restaurant/ Market ADDITIONAL FOOD SOURCES: University Food Permit (Page 2) Foods

  7. Direct Discharge Permit (Vermont)

    Broader source: Energy.gov [DOE]

    A direct discharge permit is required if a project involves the discharge of pollutants to state waters. For generation purposes, this involves the withdrawal of surface water for cooling purposes...

  8. Operating Permits (New Jersey)

    Broader source: Energy.gov [DOE]

    The owner or operator of a facility subject to this article shall obtain and maintain an operating permit for the facility. The owner or operator of a facility subject to this article shall ensure...

  9. Water Use Permitting (Wisconsin)

    Broader source: Energy.gov [DOE]

    Withdrawers in the Great Lakes Basin who withdraw water in quantities that average 100,000 gallons per day or more in any 30-day period are required to get a water use permit. Two types of water...

  10. General Air Permits (Louisiana)

    Broader source: Energy.gov [DOE]

    Any source, including a temporary source, which emits or has the potential to emit any air contaminant requires an air permit. Facilities with potential emissions less than 5 tons per year of any...

  11. Wind Energy Permitting Standards

    Broader source: Energy.gov [DOE]

    All wind facilities larger than 0.5 megawatts (MW) that begin construction after July 1, 2010, must obtain a permit from any county in which the facility is located. Facilities must also obtain...

  12. Solar Construction Permitting Standards

    Broader source: Energy.gov [DOE]

    Two bills signed in 2012 place limits on the fees that cities, counties, cities and counties, and charter cities can charge for a solar permit. AB 1801 specifies that a local government cannot base...

  13. Washington Environmental Permit Handbook - Geothermal Drilling Permit |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess |Open Energy

  14. Negotiating Title V and non-Title V permits

    SciTech Connect (OSTI)

    Erbes, R.E. [Kleinfelder, Inc., Parker, CO (United States); MacDougall, C.R. [Kleinfelder, Inc., Pleasanton, CA (United States)

    1998-12-31T23:59:59.000Z

    The Title V Operating Permits program has been extended over many more years than originally anticipated when the 1990 Clean Air Act Amendments were first legislated. In fact, the regulatory program is still being refined even as facilities complete and submit their Title V permit applications. Likewise, it is clear that the agency review of the Title V permit applications will probably take considerably longer than originally anticipated. Finally, when the agency does complete the review, it is equally clear that there will need to be a significant amount of negotiating on the part of the facility to arrive at a simplified permit that is operationally feasible. This paper presents a number of suggestions for what the facility should be doing between the time the permit application is first submitted and the agency responds with a draft permit. The suggestions are designed to help simplify the permit and enhance flexibility. In addition, the paper presents permit negotiating techniques and points out the pitfalls that will be encountered if the facility does not take action prior to receiving the draft Title V permit. This paper suggests that the facility should internally evaluate how the permit application impacts facility operations prior to the agency doing so. It also suggests that the facility should contact the agency early and amend the permit application to take advantage of increasing regulatory flexibility. By taking these steps, and properly negotiating the permit terms and conditions; the facility will achieve a much better permit, and will hopefully be able to avoid the regulatory burdens and delays associated with re-opening the permit during the next 5 to 8 years (from the time of permit application submittal).

  15. File:CDPHE Industrial Individual Wastewater Discharge Permit...

    Open Energy Info (EERE)

    Industrial Individual Wastewater Discharge Permit Application.pdf Jump to: navigation, search File File history File usage Metadata File:CDPHE Industrial Individual Wastewater...

  16. Clark County- Solar and Wind Building Permit Guides

    Broader source: Energy.gov [DOE]

    Clark County, Nevada has established guides for obtaining building permits for wind and solar photovoltaic (PV) systems for both residential and commercial purposes. The guides outline applicable...

  17. EIS-0339: Presidential Permit Application, GenPower 500 kV Submarine Electric Transmission Cable from Nova Scotia to New York

    Broader source: Energy.gov [DOE]

    The Department of Energy (DOE) announced its intent to prepare an Environmental Impact Statement (EIS) in accordance with the National Environmental Policy Act of 1969 (NEPA) for GenPower New York, L.L.C.s (GenPower) request for a Presidential permit for a proposed international electric transmission line.

  18. February 14, 1989 Missouri Department of Natural Resources NPDES Hearing on Proposed DOE Discharge Permit, DOE/OR/21548-077

    Office of Legacy Management (LM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742EnergyOn AprilA group currentBradleyTableSelling CorpNewCF INDUSTRIES,L ELIMINATIONFadcql

  19. EA-1513: Final Environmental Assessment

    Broader source: Energy.gov [DOE]

    National Pollutant Discharge Elimination System (NPDES) Wastewater Permit Compliance Alternatives at the Savannah River Site

  20. Integrated Title V/acid rain permits: Transitioning through initial permit issuance and reopenings

    SciTech Connect (OSTI)

    Bloomfield, C. [Environmental Protection Agency, San Francisco, CA (United States)

    1995-12-31T23:59:59.000Z

    Titles IV and V of the Clean Air Act Amendments of 1990 (Act or CAA) created two new stationary source permitting programs, one specific to acid rain (Title IV), and a second for operating permits in general (Title V). The Phase 2 portion of the acid rain program was designed to be implemented through the Title V operating permit program, thereby subjecting all Phase 2 acid rain sources to the requirements of Title V. Permits issued pursuant to Phase 2 of the acid rain program will be viewed as a self-contained portion of the Title V operating permit and will be governed by regulations promulgated under both Title IV and Title V. The requirements imposed by Title IV may not always be consistent with the broader operating permit program requirements of Title V, and when inconsistency occurs, the acid rain requirements will take precedence. This nonalignment will perhaps be most apparent during two stages of initial permitting: (1) the transition period following Title V program approval when permit application, issuance, and effective dates differ between the two programs, and (2) at the point when acid rain permits must be reopened to incorporate Phase 2 NO{sub x} requirements. This paper explores strategies for streamlining implementation of the two programs with particular focus on these two coordination issues.

  1. Waste Feed Delivery Environmental Permits and Approvals Plan

    SciTech Connect (OSTI)

    TOLLEFSON, K.S.

    2000-01-18T23:59:59.000Z

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  2. Oregon Stormwater Permit Application Forms and Permit Fees Website | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri:Energy Information FeesInformation Section 401StateEnergy

  3. Implementation of the Clean Air Act, Title V operating permit program requirements for the U.S. DOE Oak Ridge Reservation facilities

    SciTech Connect (OSTI)

    Humphreys, M.P. [Dept. of Energy Oak Ridge Operations Office, TN (United States). Environmental Protection Div.

    1998-12-31T23:59:59.000Z

    Title V of the Clean Air Act (CAA) establishes a new permit program requiring major sources and sources subject to Title III (Hazardous Air Pollutants) to obtain a state operating permit. Historically, most states have issued operating permits for individual emission units. Under the Title V permit program, a single permit will be issued for all of the emission units at the facility much like the current National Pollutant Discharge Elimination System (NPDES) permit program. The permit will specify all reporting, monitoring, and record-keeping requirements for the facility. Sources required to obtain permits include (a) major sources that emit 100 tons per year or more of any criteria air contaminant, (b) any source subject to the HAP provisions of Title III, (c) any source subject to the acid rain provisions of Title IV, (d) any source subject to New Source Performance Standards, and (e) any source subject to new source review under the nonattainment or Prevention of Significant Deterioration provisions. The State of Tennessee Title V Operating Permit Program was approved by EPA on August 28, 1996. This paper will provide details of initiatives underway at US Department of Energy (DOE) Oak Ridge Reservation (ORR) Facilities for implementation of requirements under the Title V Operating Permit Program. The ORR encompasses three DOE Facilities: the Y-12 Plant, Oak Ridge National Laboratory (ORNL), and the East Tennessee Technology Park (ETTP). The Y-12 Plant manufactures component parts for the national nuclear weapons program; the ORNL is responsible for research and development activities including nuclear engineering, engineering technologies, and the environmental sciences; and the ETTP conducts a variety of research and development activities and is the home of a mixed waste incinerator. Each of the three DOE Facilities is considered a major source under Title V of the CAA.

  4. Optimizing operational flexibility and enforcement liability in Title V permits

    SciTech Connect (OSTI)

    McCann, G.T. [Rust Environment and Infrastructure Inc., Greenville, SC (United States)

    1997-12-31T23:59:59.000Z

    Now that most states have interim or full approval of the portions of their state implementation plans (SIPs) implementing Title V (40 CFR Part 70) of the Clean Air Act Amendments (CAAA), most sources which require a Title V permit have submitted or are well on the way to submitting a Title V operating permit application. Numerous hours have been spent preparing applications to ensure the administrative completeness of the application and operational flexibility for the facility. Although much time and effort has been spent on Title V permit applications, the operating permit itself is the final goal. This paper outlines the major Federal requirements for Title V permits as given in the CAAA at 40 CFR 70.6, Permit Content. These Federal requirements and how they will effect final Title V permits and facilities will be discussed. This paper will provide information concerning the Federal requirements for Title V permits and suggestions on how to negotiate a Title V permit to maximize operational flexibility and minimize enforcement liability.

  5. Coastal Permit Program Rules (New Jersey)

    Broader source: Energy.gov [DOE]

    The Coastal Permit Program Rules provide the processes for permit reviews. They include details on what activities need permits; the qualifications for general permits or permits-by-rule; the...

  6. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada Test Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    SciTech Connect (OSTI)

    NSTec Environmental Programs

    2010-09-14T23:59:59.000Z

    The NTS solid waste disposal sites must be permitted by the state of Nevada Solid Waste Management Authority (SWMA). The SWMA for the NTS is the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). The U.S. Department of Energy's National Nuclear Security Administration Nevada Site Office (NNSA/NSO) as land manager (owner), and National Security Technologies (NSTec), as operator, will store, collect, process, and dispose all solid waste by means that do not create a health hazard, a public nuisance, or cause impairment of the environment. NTS disposal sites will not be included in the Nye County Solid Waste Management Plan. The NTS is located approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada (Figure 1). The U.S. Department of Energy (DOE) is the federal lands management authority for the NTS, and NSTec is the Management and Operations contractor. Access on and off the NTS is tightly controlled, restricted, and guarded on a 24-hour basis. The NTS has signs posted along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NTS. The Area 5 RWMS is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NTS (Figure 2), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. A Notice of Intent to operate the disposal site as a Class III site was submitted to the state of Nevada on January 28, 1994, and was acknowledged as being received in a letter to the NNSA/NSO on August 30, 1994. Interim approval to operate a Class III SWDS for regulated asbestiform low-level waste (ALLW) was authorized on August 12, 1996 (in letter from Paul Liebendorfer to Runore Wycoff), with operations to be conducted in accordance with the ''Management Plan for the Disposal of Low-Level Waste with Regulated Asbestos Waste.'' A requirement of the authorization was that on or before October 9, 1999, a permit was required to be issued. Because of NDEP and NNSA/NSO review cycles, the final permit was issued on April 5, 2000, for the operation of the Area 5 Low-Level Waste Disposal Site, utilizing Pit 7 (P07) as the designated disposal cell. The original permit applied only to Pit 7, with a total design capacity of 5,831 cubic yards (yd{sup 3}) (157,437 cubic feet [ft{sup 3}]). NNSA/NSO is expanding the SWDS to include the adjacent Upper Cell of Pit 6 (P06), with an additional capacity of 28,037 yd{sup 3} (756,999 ft{sup 3}) (Figure 3). The proposed total capacity of ALLW in Pit 7 and P06 will be approximately 33,870 yd{sup 3} (0.9 million ft{sup 3}). The site will be used for the disposal of regulated ALLW, small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. The only waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM). The term asbestiform is used throughout this document to describe this waste. Other TSCA waste (i.e., polychlorinated biphenyls [PCBs]) will not be accepted for disposal at the SWDS. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the U.S. Department of Energy, Nevada Operations Office (DOE/NV) 325

  7. Regulatory and Permitting Issues

    SciTech Connect (OSTI)

    Larry Myer

    2005-12-01T23:59:59.000Z

    As part of the West Coast Regional Carbon Sequestration Partnership (WESTCARB), Terralog Technologies USA, Inc., reviewed current state and federal regulations related to carbon dioxide capture and storage within geologic formations and enhanced carbon uptake in terrestrial ecosystems. We have evaluated and summarized the current and possible future permitting requirements for the six states that comprise the West Coast Regional Partnership. Four options exist for CO{sub 2} injection into appropriate geologic formations, including storage in: (1) oil and gas reservoirs, (2) saline formations, (3) unmineable coal beds, and (4) salt caverns. Terrestrial CO{sub 2} sequestration involves improved carbon conservation management (e.g. reduction of deforestation), carbon substitution (e.g., substitution for fossil fuel-based products, energy conservation through urban forestry, biomass for energy generation), and improved carbon storage management (e.g., expanding the storage of carbon in forest ecosystems). The primary terrestrial options for the West Coast Region include: (1) reforestation of under-producing lands (including streamside forest restoration), (2) improved forest management, (3) forest protection and conservation, and (4) fuel treatments for the reduction of risk of uncharacteristically severe fires (potentially with associated biomass energy generation). The permits and/or contracts required for any land-use changes/disturbances and biomass energy generation that may occur as part of WESTCARB's activities have been summarized for each state.

  8. Model operating permits for natural gas processing plants

    SciTech Connect (OSTI)

    Arend, C. [Hydro-Search, Inc., Houston, TX (United States)

    1995-12-31T23:59:59.000Z

    Major sources as defined in Title V of the Clean Air Act Amendments of 1990 that are required to submit an operating permit application will need to: Evaluate their compliance status; Determine a strategic method of presenting the general and specific conditions of their Model Operating Permit (MOP); Maintain compliance with air quality regulations. A MOP is prepared to assist permitting agencies and affected facilities in the development of operating permits for a specific source category. This paper includes a brief discussion of example permit conditions that may be applicable to various types of Title V sources. A MOP for a generic natural gas processing plant is provided as an example. The MOP should include a general description of the production process and identify emission sources. The two primary elements that comprise a MOP are: Provisions of all existing state and/or local air permits; Identification of general and specific conditions for the Title V permit. The general provisions will include overall compliance with all Clean Air Act Titles. The specific provisions include monitoring, record keeping, and reporting. Although Title V MOPs are prepared on a case-by-case basis, this paper will provide a general guideline of the requirements for preparation of a MOP. Regulatory agencies have indicated that a MOP included in the Title V application will assist in preparation of the final permit provisions, minimize delays in securing a permit, and provide support during the public notification process.

  9. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Volume 5, Chapter D, Appendix D1 (conclusion), Revision 3

    SciTech Connect (OSTI)

    Not Available

    1993-03-01T23:59:59.000Z

    The reference design for the underground facilities at the Waste Isolation Pilot Plant was developed using the best criteria available at initiation of the detailed design effort. These design criteria are contained in the US Department of Energy document titled Design Criteria, Waste Isolation Pilot Plant (WIPP). Revised Mission Concept-IIA (RMC-IIA), Rev. 4, dated February 1984. The validation process described in the Design Validation Final Report has resulted in validation of the reference design of the underground openings based on these criteria. Future changes may necessitate modification of the Design Criteria document and/or the reference design. Validation of the reference design as presented in this report permits the consideration of future design or design criteria modifications necessitated by these changes or by experience gained at the WIPP. Any future modifications to the design criteria and/or the reference design will be governed by a DOE Standard Operation Procedure (SOP) covering underground design changes. This procedure will explain the process to be followed in describing, evaluating and approving the change.

  10. Develop an effective Title V operating permit

    SciTech Connect (OSTI)

    Chadha, N.

    1997-01-01T23:59:59.000Z

    Under Title V of the 1990 Clean Air Act Amendments (CAAA), thousands of industrial and government facilities are required to apply for a comprehensive operating permit that addresses all the emission sources at a site and the CAA regulations that apply to them. The new permitting requirements apply to major sources only--although there are several definitions of a major source under the Amended Act. Because Title V applicability is based on potential to emit (PTE) rather than actual emissions, even small and medium sources may initially be subject to this program. Unlike other regulations, Title V puts the burden of demonstrating continuous compliance on source owners and operators. Careful attention to detail is necessary during the application process because the Title V permit is inherently an enforcement fool for the EPA and the general public. Noncompliance can lead to citizen suits and fines up to $25,000 per day. Therefore, it is critical to negotiate an operating permit that does not adversely impact current operations yet provides flexibility for future modifications. Each state and local agency has its own application forms and regulatory interpretations. Areas of complexity include the classification of emission units, the approach for the PTE calculation, the separation of federal and state-enforceable requirements, and the relationship between Title V and other CAAA titles. This article summarizes some lessons learned based upon experiences in various states. (It does not attempt to resolve program uncertainties among jurisdictions.) The practical strategies presented can be used for developing (or modifying) Title V applications as well as during permit negotiations.

  11. Reference: RGL 81-01 Subject: NATIONWIDE PERMIT-MAINTENANCE

    E-Print Network [OSTI]

    US Army Corps of Engineers

    Reference: RGL 81-01 Subject: NATIONWIDE PERMIT-MAINTENANCE Title: MAINTENANCE DREDGING TO MAINTAIN EXISTING STRUCTURE IN SEC 10 WATERS DOES NOT AUTHORIZE MAINTENANCE DREDGING (1977 REGS). 1 applicable to maintenance dredging. 2. Nationwide permit 322.4(c) authorizes the repair, rehabilitation

  12. Broward County Online Solar Permitting (Florida)

    Broader source: Energy.gov [DOE]

    Broward County now offers Go SOLAR Online Permitting*, for rooftop solar photovoltaic system permitting. This online permitting system may be used for residential or low commercial properties that...

  13. Presidential Permit Holders - Annual Reports | Department of...

    Energy Savers [EERE]

    Permit Holders - Annual Reports Presidential Permit Holders - Annual Reports Presidential permit holders are responsible for reporting the gross amount electric energy which flows...

  14. Manor Farm Permit Fees from 1 March 2014 Staff permits

    E-Print Network [OSTI]

    Doran, Simon J.

    -Site: low * £18.42 per month Car Share Permit * £82.00 per annum 2 or more University motorists sharing: Permit Type £ Notes Essential Use £201.00 per annum Car Share £80.00 per annum 2 or more University motorists sharing SOUPS Permits £8.75 for an allocation of 5 Maximum of 120 in an academic year University

  15. Air Pollution Control Permit to Construct and Permit to Operate...

    Broader source: Energy.gov (indexed) [DOE]

    Regulations Provider Department of Environmental Conservation The Air Pollution Control Division of the Vermont Department of Environmental Conservation requires a permit...

  16. Kentucky Department for Natural Resources and Environmental Protection permit application for air contaminant source: SRC-I demonstration plant, Newman, Kentucky. Supplement I. [Additional information on 38 items requested by KY/DNREP

    SciTech Connect (OSTI)

    Pearson, Jr., John F.

    1981-02-13T23:59:59.000Z

    In response to a letter from KY/DNREP, January 19, 1981, ICRC and DOE have prepared the enclosed supplement to the Kentucky Department for Natural Resources and Environmental Protection Permit Application for Air Contaminant Source for the SRC-I Demonstration Plant. Each of the 38 comments contained in the letter has been addressed in accordance with the discussions held in Frankfort on January 28, 1981, among representatives of KY/DNREP, EPA Region IV, US DOE, and ICRC. The questions raised involve requests for detailed information on the performance and reliability of proprietary equipment, back-up methods, monitoring plans for various pollutants, composition of wastes to flares, emissions estimates from particular operations, origin of baseline information, mathematical models, storage tanks, dusts, etc. (LTN)

  17. Storm Water Discharge Permits (Wisconsin)

    Broader source: Energy.gov [DOE]

    Wisconsin's storm water runoff regulations include permitting requirements for construction sites and industrial facilities, including those processing or extracting coal or gas. The purpose of the...

  18. Flexibility Premium in Marketable Permits

    E-Print Network [OSTI]

    Macrina, Andrea

    & solutions Problem: The problem of (air) pollution and the associated market failure had long been a part of Pollution Markets for permits Substitution Principle In a Nutshell The Premium The Model Solution Results Taschini London School of Economics Economics of Pollution Markets for permits Substitution Principle

  19. Solar Construction Permitting Standards (California)

    Broader source: Energy.gov [DOE]

    Two bills signed in 2012 place limits on the fees that cities, counties, cities and counties, and charter cities can charge for a solar permit. AB 1801 specifies that a local government cannot base...

  20. Solar Permitting & Inspection Webinar Series

    Office of Energy Efficiency and Renewable Energy (EERE)

    ICLEI Local Governments for Sustainability U.S.A. and the Interstate Renewable Energy Council, Inc. (IREC) present a series of three webinars on Solar Permitting & Inspection. As part of the U...

  1. Class 1 Permit Modification Notification

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Bureau New Mexico Environment Department 2905 Rodeo Park Drive East, Bu il ding 1 Santa Fe, New Mexico 87505-6303 JUL 0 5 2011 Subject: Notification of a Class 1 Permit...

  2. Well Permits (District of Columbia)

    Broader source: Energy.gov [DOE]

    Well permits are required for the installation of wells in private and public space. Wells are defined as any trest hole, shaft, or soil excavation created by any means including, but not limited...

  3. Solar and Wind Permitting Laws

    Broader source: Energy.gov [DOE]

    New Jersey has enacted three separate laws addressing local permitting practices for solar and wind energy facilities. The first deals with solar and wind facilities located in industrial-zoned...

  4. Permitting plan for project W-236B, initial pretreatment module

    SciTech Connect (OSTI)

    Tollefson, K.S.

    1995-01-25T23:59:59.000Z

    The Tank Waste Remediation System pretreatment process mission is to separate high-level and low-level waste fractions. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before construction and operation of the facility. This revised document provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the probability of success for each alternative for the Initial Pretreatment Module resulting from recent revisions to the Tri-Party Agreement.

  5. Application Submittal Guidance for Stormwater Permits and

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcatAntrim County, Michigan:Applewood, Colorado:Of

  6. Montana - Encroachment Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant JumpMarysville,Missoula, Montana:Northeast Asia |New York:NewMonsey,MajorLands |

  7. Montana Construction Dewatering General Permit Application Information |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant JumpMarysville,Missoula, Montana:Northeast AsiaAir Quality ProgramOpen Energy

  8. NMED - Discharge Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: Energy Resources JumpNEF AdvisorsState of New Mexico ||ROW-

  9. Full Permit Application Handbook | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdf Jump1946865°, -86.0529604° ShowCounty,EnergyCircle Developments Inc

  10. Coastal Development Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, clickInformationNew York: Energy Resources JumpCloverCounty,CCSECSReference:

  11. Permitting of Consumptive Uses of Water (Florida)

    Broader source: Energy.gov [DOE]

    Local water management districts are required to establish programs and regulations to provide for the permitting of consumptive uses of water. Such permitting programs are subject to the...

  12. Washington Environmental Permit Handbook - Dangerous Waste Treatment...

    Open Energy Info (EERE)

    Washington Environmental Permit Handbook - Dangerous Waste Treatment Storage Disposal Facility New Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Web...

  13. TPDES General Permit No. TXR150000

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    individual permit. This permit does not authorize the discharge or land disposal of any wastewater from concrete batch plants at regulated construction sites. Authorization for...

  14. Water Pollution Control Permit Regulations (Vermont)

    Broader source: Energy.gov [DOE]

    These regulations outline the permits and permitting processes for point discharges to surface waters and outline the monitoring and reporting requirements.

  15. Petroleum Pipeline Eminent Domain Permit Procedures (Georgia)

    Broader source: Energy.gov [DOE]

    The Petroleum Pipeline Eminent Domain Permit Procedures serve to protect Georgia's natural and environmental resources by requiring permits be issued by the Director of the Environmental Protection...

  16. Presidential Permits - Procedures | Department of Energy

    Office of Environmental Management (EM)

    Procedures Presidential Permits - Procedures Executive Order 12038 states that, before a Presidential permit may be issued, the action must be found to be consistent with the...

  17. Permit sellers, permit buyers S93 CLIMATE POLICY

    E-Print Network [OSTI]

    : China and Canada's roles in a global low-carbon society CHRIS BATAILLE*, JIANJUN TU, MARK JACCARD Energy, the abatement cost schedules of China and Canada are compared, and implications considered for carbon permit, coupled with supplementary regulations to address market failures. Keywords: Canada; carbon trading; China

  18. Permits

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    program, under Title V of the Clean Air Act, streamlines the way authorities regulate air pollution by consolidating all air pollution control requirements into a single,...

  19. Parking Options 2011/12 Reserved Permits

    E-Print Network [OSTI]

    Parking Options 2011/12 Reserved Permits A Reserved permit is $275 this fiscal year and is only available to faculty and staff through payroll deduction. Individuals issued a Reserved permit may park is completely full someone is parked illegally and Parking Services should be notified. Reserved permit holders

  20. Enhanced Control Installations.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    correctness. Title: Individual Permit, High Priority Sites, Examples of Enhanced Control Installations, Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759...

  1. Baseline Control Measures.pdf

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Individual Permit Baseline Control Measures at Los Alamos National Laboratory, Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759 Author(s): Veenis, Steven J....

  2. Washington Environmental Permit Handbook - Air Operating Permit | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess | Open|

  3. Market Power in Pollution Permit Markets

    E-Print Network [OSTI]

    Montero, Juan Pablo

    As with other commodity markets, markets for trading pollution permits have not been immune to market power concerns. In this paper, I survey the existing literature on market power in permit trading but also contribute ...

  4. Air Permitting for Stationary Sources (New Hampshire)

    Broader source: Energy.gov [DOE]

    The permitting system implements the permitting requirements of RSA 125-C and 125-I to regulate the operation and modification of new and existing stationary sources, area sources, and devices to...

  5. Priority Permit Processing for Green Buildings

    Broader source: Energy.gov [DOE]

    Hawaii Revised Statutes (HRS) 46-19.6 requires each county agency that issues building, construction, or development-related permits to establish a procedure for priority processing of permit...

  6. Construction Permits and Fees (New Mexico)

    Broader source: Energy.gov [DOE]

    Industries that wish to build or modify facilities that emit air pollutants (emissions) into the air must obtain an air quality permit prior to constructing. Thus, these permits are called...

  7. California Solar Permitting Guidebook, Second Edition

    Broader source: Energy.gov [DOE]

    The California Solar Permitting Guidebook is a resource for local governments and permitting agencies to facilitate installation of small solar energy systems. By adopting its recommendations, local governments can reduce permit processing times and increase their output while facilitating local economic development.

  8. Individual Permit for Storm Water

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Compliance Miscellaneous EPA Submittals Public Meetings Renewal Application Construction Certifications Corrective Action Storm Water Analytical Period Get updates on LANL...

  9. RCRA corrective action permit requirements and modifications under proposed Subpart S rule. RCRA Information Brief

    SciTech Connect (OSTI)

    Coalgate, J.

    1993-07-01T23:59:59.000Z

    Corrective action is required under the authority of the Resource Conservation and Recovery Act (RCRA) Sections 3004(u) and(v) which were added by the Hazardous and Solid Waste Amendments of 1984 (HSWA). In response to HSWA, the US Environmental Protection Agency(EPA) proposed a comprehensive corrective action program under 40 CFR 264 Subpart S [55 FR 30798, July 27, 1990]. Although Subpart S is still only proposed, it is being implemented by the EPA Regions until the rule is finalized. Proposed Subpart S corrective action applies to releases to any media from any solid waste management unit (SWMU) at a treatment, storage, or disposal facility (TSDF). Corrective action requirements under proposed Subpart S are imposed through permit conditions or, for interim status facilities, through a RCRA Section 3008(h) order. In general, upon initial regulation of a TSDF, the owner or operator submits a Part A permit application, notifying the regulatory agency of waste management activities. The Part A consists of a form containing general information about the facility, the unit(s) affected, and the wastes managed in the units. Part B of the permit application provides detailed information on the facility, the units affected, and the waste managed. The Part B permit application may consist of several volumes of information. Proposed Subpart S requirements, would be contained in the Part B permit application. The Part B permit application proposes requirements and conditions intended to respond to the various RCRA requirements for permitted units. This submittal initiates the negotiation process for regulated SWMUS, whereby the requirements and conditions for unit operation are established. The term of the permit is typically 5 or 10 years, after which a permit renewal or issuance of a new permit is required. This Information Brief provides information on the permit requirements and process under proposed Subpart S.

  10. Storm-water management for construction activities. Developing pollution prevention plans and best management practices

    SciTech Connect (OSTI)

    Not Available

    1992-09-01T23:59:59.000Z

    The manual provides industrial facilities with comprehensive guidance on the development of storm water pollution prevention plans and identification of appropriate Best Management Practices (BMPs). It provides technical assistance and support to all facilities subject to pollution prevention requirements established under National Pollutant Discharge Elimination System (NPDES) permits for storm water point source discharges. EPA's storm water program significantly expands the scope and application of the existing NPDES permit system for municipal and industrial process wastewater discharges. It emphasizes pollution prevention and reflects a heavy reliance on BMPs to reduce pollutant loadings and improve water quality. The manual provides essential guidance in both of these areas.

  11. Storm-water management for industrial activities. Developing pollution prevention plans and best management practices

    SciTech Connect (OSTI)

    Not Available

    1992-09-01T23:59:59.000Z

    The manual provides industrial facilities with comprehensive guidance on the development of storm water pollution prevention plans and identification of appropriate Best Management Practices (BMPs). It provides technical assistance and support to all facilities subject to pollution prevention requirements established under National Pollutant Discharge Elimination System (NPDES) permits for storm water point source discharges. EPA's storm water program significantly expands the scope and application of the existing NPDES permit system for municipal and industrial process wastewater discharges. It emphasizes pollution prevention and reflects a heavy reliance on BMPs to reduce pollutant loadings and improve water quality. The manual provides essential guidance in both of these areas.

  12. ParkingPermit.docx 11/2/2012 Eligibility for Visitors/Temporary Parking Permits

    E-Print Network [OSTI]

    Mohaghegh, Shahab

    ParkingPermit.docx 11/2/2012 Eligibility for Visitors/Temporary Parking Permits Visitor or Temporary Parking Permits will only be issued based on the following policies: Visitors · Visitors (Non WVU employees) to the Statler College can receive a single day visitor Parking Permit for lots 40, 41, 44

  13. PERMIT MUST BE AVAILABLE AT ENTRY LOCATION IN PLASTIC SLEEVE CONFINED SPACE ENTRY PERMIT

    E-Print Network [OSTI]

    Stuart, Steven J.

    PERMIT MUST BE AVAILABLE AT ENTRY LOCATION IN PLASTIC SLEEVE CONFINED SPACE ENTRY PERMIT CONFINED SPACE GENERAL INFORMATION: Permit Number: Call 656-1297 Date: Equipment Number: Time Issued: Valid Until (Time, max. 8 hrs): Confined Space Description and Location: Purpose of Entry: PERMIT SPACE HAZARDS

  14. Multiplicity of investment equilibria when pollution permits are not tradable

    E-Print Network [OSTI]

    Karp, Larry

    2006-01-01T23:59:59.000Z

    M ONTERO , J. (2002): Permits, standards, and technologyequilibria when pollution permits are not tradable Larryequilibria when pollution permits are not tradable Abstract

  15. Geohydrologic feasibility study of the San Juan Basin for the potential applicability of Jack W. McIntyre`s patented tool

    SciTech Connect (OSTI)

    Reed, P.D.; Tischer, S.P.; Biezugbe, G.

    1993-05-01T23:59:59.000Z

    Most of the completed wells produce methane and wastewater (brine). The produced water is usually treated and released to a surface body of water in conformance with a NPDES permit. Treatment facilities are expensive to construct and operation and maintenance costs can be high. Also, environmental regulations pertaining to the release of wastewater to surface waters of the United States is presently under governmental investigation. A new process patented by Jack W. McIntyre has both economic and environmental advantages over the conventional surface treatment and disposal. This process has been tested in the Michigan Basin and reported to be successful. The process is based on utilizing a single well for both production and water disposal. During production, fluids enter the wellbore, gas rises to the surface and water moves down into the disposal zone either by gravity or mechanical pumping. This method allows separation of gas with simultaneous disposal of the water without the economic and environmental obstacles of bringing the water to the surface. A description and discussion of Jack W. McIntyre`s tool is summarized in the compendium of the seven basins studied under this contract. Geraghty & Miller, Inc. of Midland, Texas conducted geologic and hydrologic feasibility studies of the potential applicability of Jack McIntyre`s patented tool for the recovery of natural gas from coal bed/sand formations in the San Juan Basin through literature surveys. Limited information exists on the hydrology and water quality of the immediate strata above and below the Fruitland formation. Because of the limited information on the baseline geochemistry of the coal/sand bed waters and the potential disposal zone, minimum effort was put on these zones` compatibility characterization. The study also indicates that water is produced along with gas production from the Fruitland formation. This makes the Basin a potential candidate for Jack McIntyre`s patented tool.

  16. State Water Permit Regulation (Arkansas)

    Broader source: Energy.gov [DOE]

    It is the purpose of this regulation to adopt standards applicable to the storage, discharge, or disposal of any waste which, if unregulated, will cause pollution of waters of the state or result...

  17. Washington Environmental Permit Handbook - Underground Injection...

    Open Energy Info (EERE)

    Washington Environmental Permit Handbook - Underground Injection Control Registration webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site:...

  18. WPCF Underground Injection Control Disposal Permit Evaluation...

    Open Energy Info (EERE)

    WPCF Underground Injection Control Disposal Permit Evaluation and Fact Sheet Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: WPCF Underground Injection...

  19. Colorado Air Pollution Control Division - Construction Permits...

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Web Site: Colorado Air Pollution Control Division - Construction Permits Forms and Air Pollutant Emission Notices (APENs)...

  20. Presidential Permits and Export Authorizations - Frequently Asked...

    Broader source: Energy.gov (indexed) [DOE]

    design characteristics to permit the addition of equipment (including all necessary pollution devices) necessary to render such electric powerplant capable of using coal or...

  1. Disclosure of Permitted Communication Concerning Fossil Fuel...

    Broader source: Energy.gov (indexed) [DOE]

    DOE 433 ex parte memo.pdf More Documents & Publications Disclosure of Permitted Communication Concerning Regional Standards Enforcement Framework Document -- Docket No....

  2. Disclosure of Permitted Communication Concerning Regional Standards...

    Broader source: Energy.gov (indexed) [DOE]

    furnacestdwaiverpolicy.pdf More Documents & Publications Disclosure of Permitted Communication Concerning Fossil Fuel Energy Consumption Reduction for New Construction and Major...

  3. Air Permits, Licenses, Certifications (Maine) | Department of...

    Broader source: Energy.gov (indexed) [DOE]

    Provider Department of Environmental Protection This program regulates and limits air emissions from a variety of sources within Maine through a statewide permitting program....

  4. Chapter 38 Hazardous Waste Permitting Process (Kentucky)

    Broader source: Energy.gov [DOE]

    This administrative regulation establishes the general provisions for storage, treatment, recycling, or disposal of hazardous waste. It provides information about permits and specific requirements...

  5. Catawba County- Green Construction Permitting Incentive Program

    Broader source: Energy.gov [DOE]

    Catawba County is providing incentives to encourage the construction of sustainably built homes and commercial buildings. Rebates on permit fees and plan reviews are available for certain...

  6. Groundwater Discharge Permit and Registration (New Hampshire)

    Broader source: Energy.gov [DOE]

    The Groundwater Discharge Permitting and Registration Program seeks to protect groundwater quality by establishing standards, criteria, and procedures for wastewater discharges. The program...

  7. Oregon Water Quality Permit Program (Stormwater - Industrial...

    Open Energy Info (EERE)

    Oregon Water Quality Permit Program (Stormwater - Industrial Activities) Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Oregon Water Quality...

  8. Industrial Discharge Permits (District of Columbia)

    Broader source: Energy.gov [DOE]

    All businesses and government agencies discharging process wastewater to the public sewer system must report their activities to DC Water's Pretreatment Center. Wastewater discharge permits are...

  9. Wastewater Construction and Operation Permits (Iowa)

    Broader source: Energy.gov [DOE]

    These regulations describe permit requirements for the construction and operation of facilities treating wastewater, and provide separation distances from other water sources.

  10. Solar PV Permitting and Safety Training Webinar

    Broader source: Energy.gov [DOE]

    This webinar provides training on two permitting resources for municipal inspectors; a prescriptive process for building inspectors and a guidance document for permitting for PV for electrical inspectors. The webinar also runs through a number of key code articles in Massachusetts 2014 electrical code and examines a variety of safety hazards commonly found during or after solar PV installations.

  11. Permitting plan for Hanford Tanks Initiative

    SciTech Connect (OSTI)

    Bloom, J.W.

    1998-03-19T23:59:59.000Z

    This plan describes all the permitting actions that have been identified as required to implement the Hanford Tanks Initiative. It reflects changes in the scope to the Hanford Tanks Initiative since the Rev. 0 plan was issued. The cost and schedule for the permitting actions are included.

  12. Slide 1

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site Monitoring and Management, Poster, Individual Permit for Storm Water, NPDES Permit No. NM0030759 Author(s): Veenis, Steven J. Intended for: Public Purpose: This poster was...

  13. The collision of Title III and Title V: A potential permitting and enforcement nightmare

    SciTech Connect (OSTI)

    Facca, G.; Faler, M.

    1998-12-31T23:59:59.000Z

    The Clean Air Act of 1990 (CAA) mandated that all facilities classified as major were to obtain a Federal Title V operating permit. In addition, any facility, either major or minor, which emits certain chemicals or compounds above a specific single quantity limit or a total aggregate limit are subject to Title III requirements and are required to obtain a Title V permit as well. The problem with obtaining a Title V permit for Title III substances is there is limited data, at least for the utilities sources, on emission factors and emission rates for many of the Title III listed chemical compounds. In addition, the emission data that exists is very conservative, and if used, would show the facilities to be significant emitters of hazardous air emissions, while actual emissions are significantly less. This could lead a facility to applying for a Title V permit unnecessarily, a time consuming process at best. In Iowa, facilities submitted the first Title V permit applications in 1994. The Iowa Department of Natural Resources is currently in the process of reviewing the submittals prior to issuing operating permits. Title III has not been addressed at all in the submittals and therefore will not be included in this round of finished permits that are to be issued. The outcome of this is that the Title V permits will have to be opened and amended to include the applicable Title III operating conditions and constraints. This paper will examine the areas where Title III and Title V collide and the potential permitting and enforcement issues that will have to be faced by the facilities that operate under these permits. This paper is based on the opinions of two of the three responsible parties (facilities and consultants) that are dealing with the potential permitting and enforcement wreckage before the collision occurs.

  14. ALASKA OIL AND GAS EXPLORATION, DEVELOPMENT, AND PERMITTING PROJECT

    SciTech Connect (OSTI)

    Richard McMahon; Robert Crandall; Chas Dense; Sean Weems

    2003-08-04T23:59:59.000Z

    The objective of this project is to eliminate three closely inter-related barriers to oil production in Alaska through the use of a geographic information system (GIS) and other information technology strategies. These barriers involve identification of oil development potential from existing wells, planning projects to efficiently avoid conflicts with other interests, and gaining state approvals for exploration and development projects. Each barrier is the result of either current labor-intensive methods or poorly accessible information. This project brings together three parts of the oil exploration, development, and permitting process to form the foundation for a more fully integrated information technology infrastructure for the State of Alaska. This web-based system will enable the public and other review participants to track permit status, submit and view comments, and obtain important project information online. By automating several functions of the current manual process, permit applications will be completed more quickly and accurately, and agencies will be able to complete reviews with fewer delays. The application will include an on-line diagnostic Coastal Project Questionnaire to determine the suite of permits required for a specific project. The application will also automatically create distribution lists based on the location and type of project, populate document templates for project review start-ups, public notices and findings, allow submission of e-comments, and post project status information on the Internet. Alaska has nearly one-quarter of the nation's supply of crude oil, at least five billion barrels of proven reserves. The American Association of Petroleum Geologists report that the 1995 National Assessment identified the North Slope as having 7.4 billion barrels of technically recoverable oil and over 63 trillion cubic feet of natural gas. From these reserves, Alaska produces roughly one-fifth of the nation's daily crude oil production, or approximately one million barrels per day from over 1,800 active wells. Currently, State of Alaska agencies use multiple, independent systems to identify, authenticate, and authorize customers for online transactions. Consumers of online state services may be required to manage multiple online ''profiles,'' and during a permit review process valuable time may be lost verifying identity or reconciling differences in applicant information when agency records disagree. The state's Information Technology Group is developing a shared applicant profile system that will provide an additional opportunity to demonstrate data sharing between agencies.

  15. Regulations and Permits Related to Dams (Vermont)

    Broader source: Energy.gov [DOE]

    Vermont law requires a permit, or a dam order, for the construction, alteration, or removal of dams impounding more than 500,000 cubic feet of water, including any accumulated sediments. Dam...

  16. Flood Zone Building Permits (District of Columbia)

    Broader source: Energy.gov [DOE]

    Building permits are required for new construction and development in the Special Flood Hazard Areas (SFHA). All development projects in SFHA must comply with Title 12 DCMR and Title 20 DCMR...

  17. Alteration of Terrain Permits (New Hampshire)

    Broader source: Energy.gov [DOE]

    This permit is required whenever a project proposes to disturb more than 100,000 square feet of contiguous terrain (50,000 square feet if any portion of project is within protected shoreland), or...

  18. Aquatic Habitat Protection Permit (Saskatchewan, Canada)

    Broader source: Energy.gov [DOE]

    The Environmental Management and Protection Act, 2002 (EMPA) provides for the protection of aquatic habitat and states that a permit is required: to alter the bed, bank or boundary of any water...

  19. Wind Energy Permitting Standards (North Carolina)

    Broader source: Energy.gov [DOE]

    North Carolina has statewide permitting requirements for wind energy facilities. Any wind turbine or collection of wind turbines located within a half mile of each other with a collective rated...

  20. State Surface Water Discharge Permits (New Hampshire)

    Broader source: Energy.gov [DOE]

    Rules apply to the discharge of all pollutants from a point source to surface waters of the state. The rule does not apply to facilities that require both a state discharge permit and a federal...

  1. Distributed PV Permitting and Inspection Processes

    Broader source: Energy.gov [DOE]

    This presentation summarizes case studies of the time and cost involved in the distributed PV permitting and inspection process in three Solar America Cities, Austin, Portland, and Salt Lake City.

  2. Major Source Permits (District of Columbia)

    Broader source: Energy.gov [DOE]

    The District reviews designs for new pollution sources and design modifications for existing sources. Permits are issued to allow sources to emit limited and specified amounts of pollution as...

  3. City of Asheville- Building Permit Fee Waiver

    Broader source: Energy.gov [DOE]

    The City of Asheville waives fees for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings....

  4. Overweight permit formulas for simply supported bridges

    E-Print Network [OSTI]

    Mattox, Michael Joseph

    1992-01-01T23:59:59.000Z

    OVERBRIGHT PERMIT FORMULAS POR SIMPLY SUPPORTED BRIDGES A Thesis by MICHAEL JOSEPH MATTOX Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE... December 1992 Major Subject: Civil Engineering OVERWEIGHT PERMIT FORMULAS POR SIMPLY SUPPORTED BRIDGES A Thesis by MICHAEL JOSEPH MATTOX Approved as to style and content by; James S. Noel (Chair of Committee) Walter E. Haisler (Member) rry L...

  5. Coordinating Permit Offices and the Development of Utility-Scale Geothermal Energy (Presentation)

    SciTech Connect (OSTI)

    Levine, A.; Young, K.; Witherbee, K.

    2013-10-01T23:59:59.000Z

    Permitting is a major component of the geothermal development process. Better coordination across government agencies could reduce uncertainty of the process and the actual time of permitting. This presentation highlights various forms of coordinating permit offices at the state and federal level in the western United States, discusses inefficiencies and mitigation techniques for permitting natural resource projects, analyzes whether various approaches are easily adaptable to utility-scale geothermal development, and addresses advantages and challenges for coordinating permit offices. Key successful strategies identified include: 1. Flexibility in implementing the approach (i.e. less statutory requirements for the approach); 2. Less dependence on a final environmental review for information sharing and permit coordination; 3. State and federal partnerships developed through memorandum of understanding to define roles and share data and/or developer information. A few of the most helpful techniques include: 1. A central point of contact for the developer to ask questions surrounding the project; 2. Pre-application meetings to assist the developer in identifying all of the permits, regulatory approvals, and associated information or data required; 3. A permit schedule or timeline to set expectations for the developer and agencies; 4. Consolidating the public notice, comment, and hearing period into fewer hearings held concurrently.

  6. Carbon now real factor in denying permits to coal-based generation

    SciTech Connect (OSTI)

    NONE

    2009-01-15T23:59:59.000Z

    Concerns about global climate change and uncertainties about the potential cost of carbon regulation have increased the odds that applications to build coal-fired plants will be denied. In Kansas the coal industry was stunned by the denial of an air-quality permit for a project because of concerns about global warming. It was the first time any official anywhere had invoked greenhouse gases as the reason for denying an operating permit for a proposed fossil-fueled plant.

  7. Alcohol Services Category #1 # Permit Applica2on Category #2

    E-Print Network [OSTI]

    Powers, Robert

    Alcohol Services Category #1 # Permit Applica2on Category #2 Category #3 If an outdoor event, a;ach UNL Police approved licensed area plan to Permit Request ADMINISTRATOR TO OBTAIN THE REQUIRED ALCOHOL SERVICES PERMIT FOR EACH EVENT

  8. State Waste Discharge Permit ST-4502 Implementation Plan

    SciTech Connect (OSTI)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27T23:59:59.000Z

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  9. ARM 12-14-150 - Commercial Use Permitting: Restricted Use Permitting...

    Open Energy Info (EERE)

    use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2009 Legal Citation ARM...

  10. ARM 12-14-145 - Commercial Use Permitting: Restricted Use Permit...

    Open Energy Info (EERE)

    use permits for land use within the jurisdiction of the Montana Department of Fish, Wildlife and Parks. Published NA Year Signed or Took Effect 2007 Legal Citation ARM...

  11. Application for a Permit to Operate a Class III Solid Waste Disposal Site at the Nevada National Security Site Area 5 Asbestiform Low-Level Solid Waste Disposal Site

    SciTech Connect (OSTI)

    NSTec Environmental Programs

    2010-10-04T23:59:59.000Z

    The Nevada National Security Site (NNSS) is located approximately 105 km (65 mi) northwest of Las Vegas, Nevada. The U.S. Department of Energy National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is the federal lands management authority for the NNSS and National Security Technologies, LLC (NSTec) is the Management and Operations contractor. Access on and off the NNSS is tightly controlled, restricted, and guarded on a 24-hour basis. The NNSS is posted with signs along its entire perimeter. NSTec is the operator of all solid waste disposal sites on the NNSS. The Area 5 Radioactive Waste Management Site (RWMS) is the location of the permitted facility for the Solid Waste Disposal Site (SWDS). The Area 5 RWMS is located near the eastern edge of the NNSS (Figure 1), approximately 26 km (16 mi) north of Mercury, Nevada. The Area 5 RWMS is used for the disposal of low-level waste (LLW) and mixed low-level waste. Many areas surrounding the RWMS have been used in conducting nuclear tests. The site will be used for the disposal of regulated Asbestiform Low-Level Waste (ALLW), small quantities of low-level radioactive hydrocarbon-burdened (LLHB) media and debris, LLW, LLW that contains Polychlorinated Biphenyl (PCB) Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, and small quantities of LLHB demolition and construction waste (hereafter called permissible waste). Waste containing free liquids, or waste that is regulated as hazardous waste under the Resource Conservation and Recovery Act (RCRA) or state-of-generation hazardous waste regulations, will not be accepted for disposal at the site. Waste regulated under the Toxic Substances Control Act (TSCA) that will be accepted at the disposal site is regulated asbestos-containing materials (RACM) and PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water. The term asbestiform is used throughout this document to describe RACM. The disposal site will be used as a depository of permissible waste generated both on site and off site. All generators designated by NNSA/NSO will be eligible to dispose regulated ALLW at the Asbestiform Low-Level Waste Disposal Site in accordance with the DOE/NV-325, Nevada National Security Site Waste Acceptance Criteria (NNSSWAC, current revision). Approval will be given by NNSA/NSO to generators that have successfully demonstrated through process knowledge (PK) and/or sampling and analysis that the waste is low-level, contains asbestiform material, or contains PCB Bulk Product Waste greater than 50 ppm that leaches at a rate of less than 10 micrograms of PCB per liter of water, or small quantities of LLHB demolition and construction waste and does not contain prohibited waste materials. Each waste stream will be approved through the Radioactive Waste Acceptance Program (RWAP), which ensures that the waste meets acceptance requirements outlined in the NNSSWAC.

  12. Abatement of Air Pollution: Permit to Construct and Operate Stationary...

    Broader source: Energy.gov (indexed) [DOE]

    Permits are required for the construction or major modification of a stationary source or emission unit. Some exemptions apply. These regulations describe permit requirements,...

  13. U-252: Barracuda Web Filter Input Validation Flaws Permit Cross...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks U-252: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks September...

  14. Request for Information on Permitting of Transmission Lines:...

    Energy Savers [EERE]

    Request for Information on Permitting of Transmission Lines: Federal Register Notice Volume 77, No. 38 - Feb. 27, 2012 Request for Information on Permitting of Transmission Lines:...

  15. City and County of Denver- Solar Panel Permitting (Colorado)

    Broader source: Energy.gov [DOE]

    Construction, Electrical, Plumbing and Zoning Permits* are required for Photovoltaic (PV) systems installed in the city of Denver. Denver provides same day permit review for most solar panel...

  16. Expedited Permitting of Grid-Scale Wind Energy Development (Maine)

    Broader source: Energy.gov [DOE]

    Maine's Expedited Permitting of Grid-Scale Wind Energy Development statue provides an expedited permitting pathway for proposed wind developments in certain designated locations, known as expedited...

  17. algorithm permitting spectroscopic: Topics by E-print Network

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ON SERVING ALCOHOLIC BEVERAGES and NEW ALCOHOL SERVICES PERMIT FORM This spring UNL Police reviewed UNL's Alcohol Permit procedures and guidelines to the Nebraska Liquor...

  18. The Waste Isolation Pilot Plant Hazardous Waste Facility Permit...

    Office of Environmental Management (EM)

    The Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Waste Analysis Plan The Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Waste Analysis Plan This...

  19. PRESIDENTIAL PERMIT NORTHERN STATES POWER COMPANY ORDER NO. PP-231

    Broader source: Energy.gov (indexed) [DOE]

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742Energy ChinaofSchaeferAprilOverviewEfficiencyofHSSPIA - I-ManageMisusePERMIT APPLICATION FOR

  20. Resource Conservation and Recovery Act, Part B Permit Application [for the Waste Isolation Pilot Plant (WIPP)]. Chapter E, Appendix E1, Chapter L, Appendix L1: Volume 12, Revision 3

    SciTech Connect (OSTI)

    Not Available

    1993-01-01T23:59:59.000Z

    The Waste Isolation Pilot Plant (WIPP) Project was authorized by the US Department of Energy 5 (DOE) National Security and Military Applications of the Nuclear Energy Authorization Act of 1980 (Public Law 96-164). Its legislative mandate is to provide a research and development facility to demonstrate the safe disposal of radioactive waste resulting from national defense programs and activities. To fulfill this mandate, the WIPP facility has been designed to perform scientific investigations of the behavior of bedded salt as a repository medium and the interactions between the soft and radioactive wastes. In 1991, DOE proposed to initiate a experimental Test Phase designed to demonstrate the performance of the repository. The Test Phase activities involve experiments using transuranic (TRU) waste typical of the waste planned for future disposal at the WIPP facility. Much of this TRU waste is co-contaminated with chemical constituents which are defined as hazardous under HWMR-7, Pt. II, sec. 261. This waste is TRU mixed waste and is the subject of this application. Because geologic repositories, such as the WIPP facility, are defined under the Resource Conservation and Recovery Act (RCRA) as land disposal facilities, the groundwater monitoring requirements of HWMR-7, PLV, Subpart X, must be addressed. HWMR-7, Pt. V, Subpart X, must be addressed. This appendix demonstrates that groundwater monitoring is not needed in order to demonstrate compliance with the performance standards; therefore, HWMR-7, Pt.V, Subpart F, will not apply to the WIPP facility.

  1. RCRA/UST, superfund, and EPCRA hotline training module. Introduction to: Permits and interim status (40 CFR part 270) updated as of July 1995

    SciTech Connect (OSTI)

    NONE

    1995-11-01T23:59:59.000Z

    The module presents an overview of the RCRA permitting process and the requirements that apply to treatment, storage, and disposal facilities (TSDFs) operating under interim status until a permit is issued. It lists the types of activities that do and do not require a permit. It provides CFR cites for definitions of existing hazardous waste facility and new hazardous waste facility and identifies CFR sections relevant to Part A and Part B permit information requirements and describes the difference between them. It outlines steps in the process from interim status to receipt of permit. It identifies the differences among permit modification classes, and lists the special forms of permits. It lists the permit-by-rule applications, status and eligibility requirements for interim status and the conditions for termination of interim status and lists the conditions for changes during interim status.

  2. Washington States Transportation Permit Efficiency and Accountability Committee (TPEAC)

    E-Print Network [OSTI]

    Aberle, Barbara

    2005-01-01T23:59:59.000Z

    as the Transportation Permit Efficiency and Accountability (the Transportation Permit Efficiency and Accountabilityrequired to obtain permits. Passage of the Transportation

  3. Permitting of Wind Energy Facilities: A Handbook

    SciTech Connect (OSTI)

    NWCC Siting Work Group

    2002-08-01T23:59:59.000Z

    This handbook has been written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public. Its purpose is to help stakeholders make permitting wind facility decisions in a manner which assures necessary environmental protection and responds to public needs.

  4. The Parking Permit Problem Adam Meyerson

    E-Print Network [OSTI]

    Meyerson, Adam W.

    server has an initial purchase price but also has a cost for power, internet connection, and occasional Los Angeles, CA 90095-1596 awm@cs.ucla.edu Abstract We consider online problems where purchases have time durations which expire regardless of whether the purchase is used or not. The Parking Permit

  5. Air Quality: Construction Project Air Permit Requirements

    E-Print Network [OSTI]

    Wechsler, Risa H.

    Air Quality: Construction Project Air Permit Requirements Department: Chemical and General Safety Program: Air Quality Owner: Program Manager Authority: ES&H Manual, Chapter 30, Air Quality1 All manager or operator must submit the completed form to the air quality program manager before the project

  6. Developed by: Solar Permitting Work Group

    E-Print Network [OSTI]

    by the California Center for Sustainable Energy #12;California Solar Permitting Guidebook 3 TABLE OF CONTENTS leader in renewable energy generation. Solar and wind power, as well as emerging technologies such as biomass and fuel cells, are transforming California. Renewable energy is helping to power the state

  7. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    SciTech Connect (OSTI)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01T23:59:59.000Z

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  8. Storm water pollution prevention plans

    SciTech Connect (OSTI)

    Rossmiller, R.L. (HDR Engineering, Inc., Bellevue, WA (United States))

    1993-03-01T23:59:59.000Z

    National Pollutant Discharge Elimination System (NPDES) general permit applications for industrial storm water discharge were to have been filed by October 1992. The Environmental Protection Agency (EPA) and state agencies are now issuing permits based on these applications. One compliance aspect of the permits is the Storm Water Pollution Prevention Plan (SWP3). The plan must identify the facility's potential sources of storm water pollution and develop and implement best management practices (BMPs) to reduce pollutants in storm water runoff. The objectives of the NPDES storm water program are to eliminate illegal dumping and illicit connections, and to reduce pollutants in industrial storm water discharge. These regulations require industry to develop detailed facility site maps, and describe the types, amounts and locations of potential pollutants. Based on this information, industry can develop and implement best management practices to reduce pollutants in storm water runoff.

  9. Application for Presidential Permit OE Docket No. PP-387 Soule...

    Energy Savers [EERE]

    Register (76 FR 50726) on July 30, 2013, to revise the DOE point of contact and program Web site. Federal Register Notice. PP-387 Soule Hydro FRN Correction.pdf More Documents &...

  10. NMOCD - Form G-101 - Application for Permit to Drill, Deepen...

    Open Energy Info (EERE)

    Deepen, or Plug Back Geothermal Resources Well Author State of New Mexico Energy and Minerals Department Published New Mexico Oil Conservation Division, 1978 DOI Not Provided...

  11. Application for Presidential Permit OE Docket No. PP-400 TDI...

    Energy Savers [EERE]

    to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. Federal Register Notice. PP-400NoticeFR3886907092014.pdf More Documents...

  12. Application for Presidential Permit OE Docket No. PP-398 Minnesota...

    Energy Savers [EERE]

    to construct, operate and maintain electric transmission facilities at the U.S. - Canada Border. PP-398 Great Northern Trans Line.pdf More Documents & Publications EIS-0499:...

  13. Application for Presidential Permit OE Docket No. PP-400 TDI...

    Energy Savers [EERE]

    operate, maintain, and connect a new electric transmission line across the U.S. - Canada border in northern Vermont. The New England Clean Power Link Environmental Impact...

  14. Amended Application for Presidential Permit OE Docket No: PP...

    Broader source: Energy.gov (indexed) [DOE]

    5 - Chart of Proposed Structure Heights Exhibit 6 - Drawing of Typical Converter Terminal Exhibit 7 - General Area Map of North Section Exhibit 8 - General Area Map of Central...

  15. Underground Injection Control Permit Applications for FutureGen...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    is used to generate electricity. A byproduct of the oxy-combustion process is an emission stream that has a high concentration of CO 2 that can be captured and passed through...

  16. Amended Application for Presidential Permit OE Docket No: PP...

    Broader source: Energy.gov (indexed) [DOE]

    PP-371 Amended Northern Pass Transmission FRN More Documents & Publications Amended Notice of Intent To Modify the Scope of the EIS and Conduct Additional Public Scoping Meetings,...

  17. Y-12 Industrial Landfill V. Permit application modifications

    SciTech Connect (OSTI)

    NONE

    1995-09-01T23:59:59.000Z

    This report contains the modifications in operations and design to meet the Tennessee Department of Environment and Conversation (TDEC) July 10, 1993, amendments to the regulations for Class 2 landfills. These modifications, though extensive in design and construction cost, are considered minor revisions and should not require a processing fee. Area 1 of ILF V, comprising approximately 20% of the ILF V footprint, was designed and submitted to TDEC prior to the implementation of current regulations. This initial area was constructed with a compacted clay liner and leachate collection system, and became operational in April 1994. The current regulations require landfills to have a composite liner with leachate collection system and closure cap. Modifications to upgrade Areas 2 and 3 of ILF V to meet the current TDEC requirements are included.

  18. Application for Registered Crab Receiver Permit Page 1 of 4

    E-Print Network [OSTI]

    REPORT (EDR) 1. Name of Designated Representative: 2. Business Mailing Address: 3. Business Telephone

  19. Form GWS-45 - Well Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualPropertyd8c-a9ae-f8521cbb8489Information HydroFontana, California:Groupand

  20. CDOT - State Highway Access Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomassSustainable andBucoda,BurkeNebraska:CDM Sustainable Development ToolRights

  1. CDOT - Utility/Special Use Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomassSustainable andBucoda,BurkeNebraska:CDM Sustainable Development

  2. CDOT State Highway Access Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomassSustainable andBucoda,BurkeNebraska:CDM Sustainable

  3. Caltrans Encroachment Permit Application Guide | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomassSustainableCSL Gas

  4. WSDE Air Operating Permit Application and Instructions | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga,planningFlowmeterUtah:InformationInformation

  5. Santa Fe Oversize/Overweight Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries Pvt Ltd Jump to:RoscommonSBYSalton

  6. CDPHE Industrial Individual Wastewater Discharge Permit Application | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:Power LP Biomass Facilityin Charts Jump to: navigation, searchEnergy

  7. Air Permit Program Application Forms | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1AMEE JumpAeroWindcapitalInformation In-KindUnsolicitedForms

  8. Alaska Fish Habitat Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1AMEEAisin Seiki G60Alameda2008 | Open Energy2009 ||Fish Habitat

  9. Alaska Special Area Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcat 1AMEEAisin Seikiand Telephone Co (Redirected fromSpecial Area

  10. Hawaii Guide for Filing Community Noise Permit Applications | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetec AG|Information OpenEI Reference LibraryAdd to library

  11. Hawaii Permit Application for Solid Waste Management Facility | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetec AG|Information OpenEI ReferenceNoise Forms and Links

  12. Hazardous Waste Part A Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetec AG|Information OpenEIHas BeenLegal Document- OtherOther: Hazardous

  13. Idaho DEQ Air Quality Permits Applicant and DEQ Responsibilities guidebook

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty, Texas:ITC Transmission JumpInformationOpen0 Jump|

  14. Idaho Instructions for Filing an Application for Permit to Appropriate |

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty, Texas:ITC TransmissionIdaho DEQInformationProofOpen

  15. Idaho Permit to Construct Application Webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty, Texas:ITC TransmissionIdahoInformation Abandon

  16. Idaho Right-of-Way Encroachment Application and Permit - Other

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are8COaBulkTransmissionSitingProcess.pdfGetecGtel JumpCounty, Texas:ITC TransmissionIdahoInformationForm 204)

  17. Community Wind Handbook/Submit Permit Applications | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovationin UrbanCityCoatedCommunity Electric Coop

  18. Oregon Removal-Fill Permit Application Webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall,Missouri:Energy Information Fees forInformationPlugging

  19. Application for a Colorado State Permit for Achaeological or

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia: Energy Resources JumpAnaconda,Anza Electric CoopEnergy

  20. Title V Operation Permit Application Webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro Industries PvtStratosolarTharaldsonInformation 61 Drilling1969

  1. Application for Nonpurposeful Eagle Take Permit | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcatAntrim County, Michigan:Applewood, Colorado:OfEnergyNonpurposeful

  2. Application for Permit to Construct Access Driveway Facilities on Highway

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcatAntrim County, Michigan:Applewood,

  3. Arizona State Land Department Applications and Permits Website | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:Ezfeedflag JumpID-fTriWildcatAntrim County,DelhiArdmore,Ariton,Energy Information

  4. Colorado Construction Air Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnualProperty EditCalifornia:PowerCER.png El CERCollier Technologies IncCity, Arizona:Construction

  5. Montana Ground Water Pollution Control System Permit Application Forms

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant JumpMarysville,Missoula, Montana:Northeast AsiaAir| Open Energy

  6. Montana Restricted Use Permit Application | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant JumpMarysville,Missoula, Montana:Northeast AsiaAir| OpenUseSupply Law and

  7. Montana Suction Dredge General Permit Application Information | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer Plant JumpMarysville,Missoula, Montana:Northeast AsiaAir| OpenUseSupplyProtection

  8. NDMV - Longer Combination Vehicle (LCV) Permit Application | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: Energy Resources Jump to:MuskingumMyers-4Information NDMV -

  9. NDOT - Application Information for Evaluating Annual Permit | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: Energy Resources Jump to:MuskingumMyers-4Information NDMV

  10. NMDOT Application for Permit to Install Utility Facilities Within Public

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: Energy Resources JumpNEF AdvisorsState of New Mexico ||ROW |

  11. NMDOT Utility Permit Application Checklist | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: Energy Resources JumpNEF AdvisorsState of New Mexico ||ROW

  12. NMHPD Application for Permit to Excavate Human Burials | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: Energy Resources JumpNEF AdvisorsState of New

  13. NMSLO Application for Permit to Conduct Geophysical Exploration on Unleased

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: Energy Resources JumpNEFAppropriation and Use ofNMSLOState Lands

  14. Nevada Industrial Solid Waste Disposal Site Permit Application | Open

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: EnergyEnergyPPCR) JumpAir QualityBureauProperties Webpage |

  15. Nevada Sample Application for Permit Under Utility Environmental Protection

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal Pwer PlantMunhall, Pennsylvania: EnergyEnergyPPCR) JumpAirWork (Water Right)

  16. BLM - Paleontological Resources Use Permit Application | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomass Conversions Inc Jump to:AurigaPlantillas JumpBESolar

  17. United States Coast Guard Bridge Permit Application Guide | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga, IndianaTurtleCooperative Place: Beaver Dam,PopulationOil

  18. Vermont Individual Stormwater Discharge Permit Application | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown of Ladoga,planning methodologiesVenkataraya| Open Energy

  19. Colorado - Access Permit Application File Review Checklist | Open Energy

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand JumpConceptual Model, clickInformationNew York: EnergyCoeur dColmar,US ForestPark,Colony3

  20. Permit Regulations for the Construction and, or Operation of Air Emissions Equipment (Mississippi)

    Broader source: Energy.gov [DOE]

    The Permit Board will issue two types of air pollution control permits, a permit to construct air emissions equipment and a State Permit to Operate such equipment. A State Permit to Operate is...

  1. Experiment Hazard Class 15.2 - USDA Soil Permit

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    shipment, and disposal of regulated soil samples. A copy of the current APS USDA Soil Permit must accompany all samples. A copy of the home institution's soil permit is required...

  2. V-193: Barracuda SSL VPN Input Validation Hole Permits Cross...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    2.3.3.216 Addthis Related Articles U-252: Barracuda Web Filter Input Validation Flaws Permit Cross-Site Scripting Attacks U-144:Juniper Secure Access Input Validation Flaw Permits...

  3. UPDES General Permit for Discharges from Construction Activities...

    Open Energy Info (EERE)

    Discharges from Construction Activities (Permit No. UTRC00000) Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: UPDES General Permit...

  4. Exclusionary manipulation of carbon permit markets: a laboratory test

    E-Print Network [OSTI]

    Carln, Bjrn.

    The experiment reported here tests the case of so-called exclusionary manipulation of emission permit markets, i.e., when a dominant firm -- here a monopolist -- increases its holding of permits in order to raise its rivals' ...

  5. City and County of Denver- Solar Panel Permitting

    Broader source: Energy.gov [DOE]

    Denver provides same-day permit review for most solar panel projects. Electrical, Plumbing, and Zoning Permits* are required for photovoltaic (PV) systems installed in the city of Denver, althoug...

  6. Waste-to-energy permitting sourcebook

    SciTech Connect (OSTI)

    Longwell, D.; Wegrecki, A.; Williams, D. (Bechtel Group, Inc., San Francisco, CA (United States))

    1992-10-01T23:59:59.000Z

    Environmental issues, regulatory processes and approvals important in obtaining a permit to construct and/or operate a waste-to-energy (WTE) facility are identified and discussed. Environmental issues include: (1) air emission levels, their control and potential impacts, (2) ash leachability, treatment, and disposal, (3) potential health risks from emissions, and (4) other issues such as need/benefit and public perception of WTE. Laws, regulations and approvals that can affect project development are identified and listed, and potential regulatory trends are discussed. A general permit acquisition plan is also presented. An analysis of environmental and regulatory data obtained from the literature, regulatory agencies, and specific projects is presented. California and Massachusetts, both with regulations generally more stringent than federal regulations and considered environmentally conservative, were selected for detailed state regulatory review. Two project case histories (Commerce Refuse-to-Energy (RTE) Project in California and SEMASS WTE Project in Massachusetts) were selected to illustrate: (1) how regulations are actually applied to a project, (2) project-specific permit and operating conditions, and (3) project-specific environmental issues. Modern WTE plots employ state-of-the-art air emission control technologies and strategies to reduce air emission is to levels below regulatory requirements and to reduce estimated health risks to within EPA's acceptable risk range. WTE ash leachate can exhibit hazardous waste characteristics, primarily lead and cadmium. However, modern landfills utilize liners and leachate collection systems to prevent infiltration of leachate into the groundwater supply. Modern WTE plants employ dry systems and have zero process wastewater discharge.

  7. PERMITTING LEADERSHIP IN THE UNITED STATES

    SciTech Connect (OSTI)

    Ken Nemeth

    2002-09-01T23:59:59.000Z

    In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical assistance to evaluate DOE's cleanup plans. In addition, the PLUS program has facilitated the involvement of key regulators from host-states beyond the Southern region.

  8. Caltrans Transportation Permits Manual | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are beingZealand Jump to:EzfeedflagBiomassSustainableCSL GasPermits Manual Jump to: navigation, search OpenEI Reference

  9. WSDE Nationwide Permit webpage | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide Permit webpage Jump to: navigation, search OpenEI Reference

  10. Washington Environmental Permit Handbook - Dangerous Waste Treatment

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess |

  11. Washington Environmental Permit Handbook - Underground Injection Control

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere IRaghuraji Agro IndustriesTown ofNationwide PermitInformationIsland: Energy ResourcesProcess

  12. Presidential Permits - Procedures | Department of Energy

    Office of Environmental Management (EM)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645 3,625 1,006 492 742 33 1112011 Strategic2 OPAM615_CostNSAR - T enAmountCammieReserve |GeothermalDepartment ofPermits -

  13. Sandia Energy - Permitting, Inspection, and Interconnection

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative1 First Use of Energy for All Purposes (Fuel and Nonfuel), 2002; Level: National5Sales for4,645U.S. DOE Office of ScienceandMesa del Sol Home Distribution Grid IntegrationOffshore WindPartnership HomePastPermitting,

  14. Coordinating Permit Office | OpenEI Community

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov You are being directedAnnual Siteof EnergyInnovationinConcentratingEnergy InformationsourceEnergyCooperativesPermit

  15. Permit by Rule Guide | Open Energy Information

    Open Energy Info (EERE)

    AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page onYou are now leaving Energy.gov You are now leaving Energy.gov YouKizildere I Geothermal PwerPerkins County, Nebraska: Energy Resources Jump to: navigation, search EquivalentPermaPermit

  16. Innovation and Success in Solar Permitting and Inspection

    Broader source: Energy.gov [DOE]

    This document summarizes several successful initiatives to streamline and standardize permitting requirements for local solar photovoltaic (PV) projects.

  17. On-Site Wastewater Treatment Systems: Selecting and Permitting (Spanish)

    E-Print Network [OSTI]

    Lesikar, Bruce J.

    2005-04-30T23:59:59.000Z

    This publication explains how to select and obtain a permit for an on-site wastewater treatment system in Texas....

  18. CSEM WP 113 Using Environmental Emissions Permit Prices to Raise

    E-Print Network [OSTI]

    California at Berkeley. University of

    CSEM WP 113 Using Environmental Emissions Permit Prices to Raise Electricity Prices: Evidence from Emissions Permit Prices to Raise Electricity Prices: Evidence from the California Electricity Market analyzes the extent to which the conditions in the emissions permit market for oxides of nitrogen (NOx

  19. T:\\PTSData\\ParkingRequest\\Disabled Permit Disabled Student Services

    E-Print Network [OSTI]

    de Lijser, Peter

    T:\\PTSData\\ParkingRequest\\Disabled Permit Disabled Student Services Temporary Disabled Person Parking Permit Request Form Parking & Transportation Services (657) 278-3082 / Fax (657) 278-4533 Temporary Disabled Person permits will be issued after completion of Section II by Disabled Student Services

  20. Permit Allocation in Emissions Trading using the Boltzmann Distribution

    E-Print Network [OSTI]

    Park, Ji-Won; Isard, Walter

    2011-01-01T23:59:59.000Z

    In emissions trading, the initial permit allocation is an intractable issue because it needs to be essentially fair to the participating countries. There are many ways to distribute a given total amount of emissions permits among countries, but the existing distribution methods such as auctioning and grandfathering have been debated. Here we describe a new model for permit allocation in emissions trading using the Boltzmann distribution. The Boltzmann distribution is introduced to permit allocation by combining it with concepts in emissions trading. A price determination mechanism for emission permits is then developed in relation to the {\\beta} value in the Boltzmann distribution. Finally, it is demonstrated how emissions permits can be practically allocated among participating countries in empirical results. The new allocation model using the Boltzmann distribution describes a most probable, natural, and unbiased distribution of emissions permits among multiple countries. Based on its simplicity and versati...