Powered by Deep Web Technologies
Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Management of Hanford Site non-defense production reactor spent nuclear fuel, Hanford Site, Richland, Washington  

SciTech Connect

The US Department of Energy (DOE) needs to provide radiologically, and industrially safe and cost-effective management of the non-defense production reactor spent nuclear fuel (SNF) at the Hanford Site. The proposed action would place the Hanford Site`s non-defense production reactor SNF in a radiologically- and industrially-safe, and passive storage condition pending final disposition. The proposed action would also reduce operational costs associated with storage of the non-defense production reactor SNF through consolidation of the SNF and through use of passive rather than active storage systems. Environmental, safety and health vulnerabilities associated with existing non-defense production reactor SNF storage facilities have been identified. DOE has determined that additional activities are required to consolidate non-defense production reactor SNF management activities at the Hanford Site, including cost-effective and safe interim storage, prior to final disposition, to enable deactivation of facilities where the SNF is now stored. Cost-effectiveness would be realized: through reduced operational costs associated with passive rather than active storage systems; removal of SNF from areas undergoing deactivation as part of the Hanford Site remediation effort; and eliminating the need to duplicate future transloading facilities at the 200 and 400 Areas. Radiologically- and industrially-safe storage would be enhanced through: (1) removal from aging facilities requiring substantial upgrades to continue safe storage; (2) utilization of passive rather than active storage systems for SNF; and (3) removal of SNF from some storage containers which have a limited remaining design life. No substantial increase in Hanford Site environmental impacts would be expected from the proposed action. Environmental impacts from postulated accident scenarios also were evaluated, and indicated that the risks associated with the proposed action would be small.

1997-03-01T23:59:59.000Z

2

Thomas Jefferson National Accelerator Facility Site Tour - Accelerator Map  

NLE Websites -- All DOE Office Websites (Extended Search)

Counting House Free Electron Accelerator Facility Machine Control Center Physics Storage Building North Linear Accelerator South Linear Accelerator VEPCO Substation Machine Control Center Annex Machine Control Center Annex II North Access Building South Access Building Central Helium Liquefier Injector Hall A Truck Ramp Hall B Truck Ramp Hall C Truck Ramp Experimental Hall A Experimental Hall B Experimental Hall C East Arc West Arc Counting House Free Electron Accelerator Facility Machine Control Center Physics Storage Building North Linear Accelerator South Linear Accelerator VEPCO Substation Machine Control Center Annex Machine Control Center Annex II North Access Building South Access Building Central Helium Liquefier Injector Hall A Truck Ramp Hall B Truck Ramp Hall C Truck Ramp Experimental Hall A Experimental Hall B Experimental Hall C East Arc West Arc Science Education Jefferson Lab Jefferson Lab Home Search Jefferson Lab Contact Jefferson Lab Science Education Home Teacher Resources Student Zone Games and Puzzles Science Cinema Programs and Events Search Education Privacy and Security Notice Jefferson Lab Site Tour Guided Tour Site Map Accelerator Area Map Administrative Area Map Tour Index

3

Recovery Act funding accelerates cleanup of Idaho Site, Creates...  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act funding accelerates cleanup of Idaho Site, Creates jobs in community IDAHO FALLS American Recovery and Reinvestment Act (ARRA) funding has accelerated a project...

4

Accelerated Closure of the Hanford Site  

Science Conference Proceedings (OSTI)

Cleanup of the Hanford Site is currently planned to take until 2046 and another approximately $SOB. In the summer of 1999, Fluor Hanford initiated an ''Accelerated Closure Team'' to evaluate opportunities to reduce this long schedule and high cost for the parts of the Hanford Site which they manage. To-date, this breakthrough team has developed two approaches which will move > 50 million curies away from the Columbia River sooner than planned and at a significantly reduced cost. The approaches successfully applied so far are presently being applied to other opportunities at Hanford.

WILDE, R.T.

2000-09-20T23:59:59.000Z

5

Hanford as a site for large accelerators  

SciTech Connect

The Ramsey Panel recommended that two very large accelerators be constructed during the next few years to meet urgent U. S. needs in high energy physics. Two studies have been made. The Lawrence Radiation Laboratory at Berkeley has studied a 200 to 300 BeV accelerator, while the Brooknaven National Laboratory on Long Island has made an analysis of a still larger accelerator--600 to 800 BeV. This special report is in response to a request for information on the suitability of the Atomic Energy Commission' s Hanford Project as a site for a large accelerator. Using criteria recommended by Lawrence and Brookhaven, the Hanford site offers significant economic advantages both in original installed cost and in annual operating expense. These advantages are: (1) Land--Hanford has available more than 150 square miles of govermnentowned land that readily meets topographic, geologic, and seismic criteria; (2) Power--- Hanford has surplus electrical capacity already installed to meet the demands of the largest accelerator--- at the lowest rates in the U. S. This alone offers an annual savings of several million dollars over any other location; (3) Water--- the Columbia River offers the largest supply of pure, cold water in the U. S.; there are excellent surplus reactor water plants available; (4) Transportation---four major railroads have direct connections to the Hanford Project rail system; multi- 1000-ton barge service is also available; (5) manpower---a high level of scientific and technical personnel as well as construction and craft labor is already in residence; (6) Services---complete support-type services, such as industrial shops, bus transportation, radiation protection, and plant security, are immediately available; and (7) Community--the area has an exceptionally high educational level, equal to the outstanding areas of the U. S. At the present time, the Hanford location has some disadvantages according to the cited criteria. These are: (1) lack of proximity to a university; (2) lack of a major jet airport; and (3) relative isolation from a major metropolitan area. The first two are even now under vigorous study and action by both state and local bodies. The third, though often a disadvantage, appears to have considerable appeal to many. In total, the many tangible assets of the Hanford Project offer tremendous potential dollar savings to the Government. The shutdown of preduction reactors makes many millions of dollars worth of excellent support facilities and manpower readily available. The minor disadvantages can be met almost entirely by the state and community. (auth)

Leonard, B.R. Jr.

1965-01-01T23:59:59.000Z

6

Innovative Technique Accelerates Waste Disposal at Idaho Site | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Innovative Technique Accelerates Waste Disposal at Idaho Site Innovative Technique Accelerates Waste Disposal at Idaho Site Innovative Technique Accelerates Waste Disposal at Idaho Site May 15, 2013 - 12:00pm Addthis A product drum of mixed low-level waste is lowered into a high-density polyethylene macro-pack. A product drum of mixed low-level waste is lowered into a high-density polyethylene macro-pack. Macro-packs from the Idaho site are shown here safely and compliantly disposed. Macro-packs from the Idaho site are shown here safely and compliantly disposed. A product drum of mixed low-level waste is lowered into a high-density polyethylene macro-pack. Macro-packs from the Idaho site are shown here safely and compliantly disposed. IDAHO FALLS, Idaho - An innovative treatment and disposal technique is enabling the Idaho site to accelerate shipments of legacy nuclear waste for

7

Innovative Technique Accelerates Waste Disposal at Idaho Site | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Innovative Technique Accelerates Waste Disposal at Idaho Site Innovative Technique Accelerates Waste Disposal at Idaho Site Innovative Technique Accelerates Waste Disposal at Idaho Site May 15, 2013 - 12:00pm Addthis A product drum of mixed low-level waste is lowered into a high-density polyethylene macro-pack. A product drum of mixed low-level waste is lowered into a high-density polyethylene macro-pack. Macro-packs from the Idaho site are shown here safely and compliantly disposed. Macro-packs from the Idaho site are shown here safely and compliantly disposed. A product drum of mixed low-level waste is lowered into a high-density polyethylene macro-pack. Macro-packs from the Idaho site are shown here safely and compliantly disposed. IDAHO FALLS, Idaho - An innovative treatment and disposal technique is enabling the Idaho site to accelerate shipments of legacy nuclear waste for

8

Recovery Act Investment Accelerates Cleanup Work at DOE's Paducah Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Investment Accelerates Cleanup Work at DOE's Paducah Investment Accelerates Cleanup Work at DOE's Paducah Site Recovery Act Investment Accelerates Cleanup Work at DOE's Paducah Site July 15, 2011 - 12:00pm Addthis UF6 piping deactivation The black inlet hose is attached to a negative air machine that allows Feed Plant cleanup workers to safely deactivate uranium hexafluoride (UF6) piping, seen at right of the lift supporting the crew. UF6 piping deactivation The black inlet hose is attached to a negative air machine that allows Feed Plant cleanup workers to safely deactivate uranium hexafluoride (UF6) piping, seen at right of the lift supporting the crew. Heavy equipment demo Heavy equipment demolishes the last part of the eastern third of the Feed Plant at the Paducah Site. Cleanup continues to prepare the remaining part of the complex, backgroundfor demolition later.

9

Actions to Support Employees of Accelerated Closure Sites, 5/19/2000 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Actions to Support Employees of Accelerated Closure Sites, Actions to Support Employees of Accelerated Closure Sites, 5/19/2000 Actions to Support Employees of Accelerated Closure Sites, 5/19/2000 At present, there are approximately 400 employees assigned to accelerated closure sites. These sites are among our former nuclear production sites that are now being managed for clean up and closure on or before fiscal year 2006. As you may know, these sites have been identified in the Department's appropriations language for accelerated closure for the purpose of transitioning the real property to private commercial activities or environmentally friendly set-asides. Accelerated closure of these sites requires that employees with critical skills be retained, to the extent possible, to complete closure activities. Upon completion of closure activities requiring their specialized skills,

10

2011 Annual Planning Summary for Stanford Linear Accelerator Center Site Office (SLAC)  

Energy.gov (U.S. Department of Energy (DOE))

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Stanford Linear Accelerator Center Site Office (SLAC SO) (See also Science).

11

EIS-0270: Accelerator Production of Tritium at the Savannah River Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EIS-0270: Accelerator Production of Tritium at the Savannah River EIS-0270: Accelerator Production of Tritium at the Savannah River Site EIS-0270: Accelerator Production of Tritium at the Savannah River Site Summary This EIS evaluates the potential environmental impact of a proposal to construct and operate an Accelerator for the Production of Tritium at the Savannah River Site. Public Comment Opportunities None available at this time. Documents Available for Download May 14, 1999 EIS-0288: Consolidated Record of Decision (EIS-0270 & EIS-0271) Tritium Supply and Recycling March 1, 1999 EIS-0270: Final Environmental Impact Statement Accelerator Production of Tritium at the Savannah River Site September 5, 1996 EIS-0270: Notice of Intent to Prepare an Environmental Impact Statement Construction and Operation of an Accelerator for the Production of Tritium

12

May 19, 2000 Memo, Actions to Support Employees of Accelerated Closure Sites  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

," I'@ ." A:r " The Deputy Secretary of Energy Washington, DC 20585 May 19,2000 MEMOIVINDUM FOR HEADS OF DEPARTMENTAL ELEMENTS FROM: 9P T. J. GLAUTHIER SUBJECT: Actions to Support Employees of Accelerated Closure Sites At present, there are approximately 400 employees assigned to accelerated closure sites. These sites are among our former nuclear production sites that are now being managed for clean up and closure on or before fiscal year 2006. As you may know, these sites have been identified in the Department's appropriations language for accelerated closure for the purpose of transitioning the real property to private commercial activities or environmentally friendly set-asides. Accelerated closure of these sites requires that employees with critical skills be retained, to the extent possible, to complete closure activities. Upon completion of closure

13

ORNLIRASA-95117 LIFE SCIENCES DIVISION Environmental Restoration and Waste Management Non-Defense Programs  

Office of Legacy Management (LM)

95117 95117 LIFE SCIENCES DIVISION Environmental Restoration and Waste Management Non-Defense Programs (Activity No. EX 20 20 01 0; ADS1310AA) Results of the Independent Radiological Verification Survey at the Former Chapman Valve Manufacturing Company, Indian Orchard, Massachusetts (cIooo1v) R. E. Rodriguez and C. A. Johnson Date issued -May 1997 Investigation Team R. D. Foley-Measurement Applications and Development Manager M. E. Murray-FUSRAP Project Director R. E. Rodriguez-Field Survey Team Leader Survey Team Members R. C. Gosslee V. P. Patania R. E. Rodriguez Work performed by the Measurement Applications and Development Group Prepared by the OAK RIDGE NATIONAL LABORATORY Oak Ridge, Tennessee 37831-6285 managed by LOCKHEED MARTIN ENERGY RESEARCH CORP.

14

Determination of effective acceleration for use in design at the Lawrence Livermore National Laboratory site  

Science Conference Proceedings (OSTI)

An rms-based effective acceleration study has been conducted for the Lawrence Livermore National Laboratory. The study used real time history records with epicentral distances, magnitudes and site conditions deemed appropriate for the LLNL Livermore site. Only those records having strong motion durations, T{sub D}{prime}, >3.0 seconds, and peak ground acceleration {ge} .4g were selected for determining the effective acceleration hazard curve used in design. These parameters are consistent with LLNL's use of broad-band Newmark-Hall Spectra for design, and the high peak instrumental accelerations corresponding to the return intervals of interest. Study results were used to modify the acceleration hazard curve for facility design/evaluation at LLNL.

Coats, D.W. Jr.

1991-09-01T23:59:59.000Z

15

Accelerators  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerators Elementary Particles Detectors Accelerators Visit World Labs For Children - for younger people For Children The Electric Force For Children Electric Force Fields For...

16

The Accelerated Site Technology Deployment Program/Segmented Gate System Project  

Science Conference Proceedings (OSTI)

The Department of Energy (DOE) is working to accelerate the acceptance and application of innovative technologies that improve the way the nation manages its environmental remediation problems. The DOE Office of Science and Technology established the Accelerated Site Technology Deployment Program (ASTD) to help accelerate the acceptance and implementation of new and innovative soil and ground water remediation technologies. Coordinated by the Department of Energy's Idaho Office, the ASTD Program reduces many of the classic barriers to the deployment of new technologies by involving government, industry, and regulatory agencies in the assessment, implementation, and validation of innovative technologies. Funding is provided through the ASTD Program to assist participating site managers in implementing innovative technologies. The program provides technical assistance to the participating DOE sites by coordinating DOE, industry, and regulatory participation in each project; providing finds for optimizing full-scale operating parameters; coordinating technology performance monitoring; and by developing cost and performance reports on the technology applications.

PATTESON,RAYMOND

2000-09-18T23:59:59.000Z

17

The accelerated site technology deployment program presents the segmented gate system  

Science Conference Proceedings (OSTI)

The Department of Energy (DOE) is working to accelerate the acceptance and application of innovative technologies that improve the way the nation manages its environmental remediation problems. The DOE Office of Science and Technology established the Accelerated Site Technology Deployment Program (ASTD) to help accelerate the acceptance and implementation of new and innovative soil and ground water remediation technologies. Coordinated by the Department of Energy's Idaho Office, the ASTD Program reduces many of the classic barriers to the deployment of new technologies by involving government, industry, and regulatory agencies in the assessment, implementation, and validation of innovative technologies. The paper uses the example of the Segmented Gate System (SGS) to illustrate how the ASTD program works. The SGS was used to cost effectively separate clean and contaminated soil for four different radionuclides: plutonium, uranium, thorium, and cesium. Based on those results, it has been proposed to use the SGS at seven other DOE sites across the country.

PATTESON,RAYMOND; MAYNOR,DOUG; CALLAN,CONNIE

2000-02-24T23:59:59.000Z

18

acceleration  

NLE Websites -- All DOE Office Websites (Extended Search)

middle name. The head of Fermilab's Accelerator Division explains a basic idea of high-energy physics in everyday language. Painless Physics Articles BEAM COOLING August 2, 1996...

19

Accelerator  

NLE Websites -- All DOE Office Websites (Extended Search)

1. ACCELERATOR PHYSICS OF COLLIDERS Revised July 2011 by D. A. Edwards (DESY) and M. J. Syphers (MSU) 1.1. Luminosity This article provides background for the High-Energy Collider...

20

Acceleration  

NLE Websites -- All DOE Office Websites (Extended Search)

Acceleration Acceleration of porous media simulations on the Cray XE6 platform Kirsten M. Fagnan, Michael Lijewski, George Pau, Nicholas J. Wright Lawrence Berkeley National Laboratory 1 Cyclotron Road Berkeley, CA 94720 May 18, 2011 1 Introduction In this paper we investigate the performance of the Porous Media with Adaptive Mesh Refinment (PMAMR) code which was developed in the Center for Computational Science and Engineering at Lawrence Berkeley National Laboratory. This code is being used to model carbon sequestration and contaminant transport as part of the Advanced Simulation Capability for Environmental Management (ASCEM) project. The goal of the ASCEM project is to better understand and quantify flow and contaminant transport behavior in complex geological systems. It will also address the long-term performance of engineered components including cementitious materials in

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Comments on Hanford 2012 Accelerating Clean Up and Shrinking the Site  

SciTech Connect

In the late summer of 2000, the Department of Energy Richland Operations Office (RL) Manager, Keith Klein, announced his approach to cleanup of the Hanford Site in a document called ''Done in a Decade.'' He asked for comments and suggestions to improve the plan from employees and stakeholders. We received over 300 individual comments. Several of the comments and the Hanford Advisory Board objected to the title of the plan, leading us to change it to ''Hanford 2012 Accelerating Cleanup and Shrinking the Site.'' We addressed virtually all substantive comments, i.e. those that recommended a change in the text, better understanding of an Issue, or consideration of a new Mea, and incorporated editorial comments where appropriate. We thank all those who took time to comment. The new plan, ''Hanford 2012'', is a much better document because you did so. You will notice some things about the table: Comments are not quoted verbatim--most were paraphrased to conserve space; Comments were separated into one of four sections: general, the River, the Plateau, the Future; Commenters are not identified by name or organization; Comments are generally listed in the order in which they were received, several comments were repetitive, but differed slightly so we made an effort to respond to each one, despite apparent repetition; There are many acronyms used at the Hanford Site, most of which can be found on the Web at http:/Ewww.hanford.gov/acronyml. We have attempted to spell out each acronym the first time it's used in a comment/response with the following exceptions: DOE--Department of Energy; RL--Department of Energy, Richland Operations Office; and ORP--Department of Energy, Office of River Protection.

SHERMAN, Y.T.

2001-01-01T23:59:59.000Z

22

FY 2006 Volume 5  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

5 5 February 2005 DOE/ME-0050 Volume 5 Environmental Management Defense Site Acceleration Completion Defense Environmental Services Non-Defense Site Acceleration Completion Non-Defense Environmental Services Uranium Enrichment Decontamination and Decommissioning Fund Department of Energy FY 2006 Congressional Budget Request Office of Management, Budget and Evaluation/CFO Volume 5 February 2005 DOE/ME-0050 Volume 5 Environmental Management Defense Site Acceleration Completion Defense Environmental Services Non-Defense Site Acceleration Completion Non-Defense Environmental Services Uranium Enrichment Decontamination and Decommissioning Fund Printed with soy ink on recycled paper Defense Site Acceleration Completion Defense Environmental Services Non-Defense Site Acceleration Completion

23

SLAC National Accelerator Laboratory - Accelerator Research  

NLE Websites -- All DOE Office Websites (Extended Search)

An image of the FACET equipment and a man examining it. ACCELERATOR PHYSICS Accelerators form the backbone of SLAC's on-site experimental program. They are complicated...

24

Strategies for accelerating cleanup at toxic waste sites: Fast-tracking environmental actions and decision making  

Science Conference Proceedings (OSTI)

Presents truly innovative advances in investigative and cleanup technologies, offering valuable solutions that streamline the data collection process, speed up the time it takes to characterize a site, and expedite decision making.

Payne, S.M. [Tetra Tech EM Inc., Helena, MT (United States)

1998-12-31T23:59:59.000Z

25

FY 2005 Control Table by Appropriation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appropriation Appropriation (dollars in thousands - OMB Scoring) Table of Contents Summary...................................................................................................... 1 Mandatory Funding....................................................................................... 3 Energy Supply.............................................................................................. 4 Non-Defense site acceleration completion................................................... 5 Uranium enrichment D&D fund.................................................................... 5 Non-Defense environmental services.......................................................... 5 Science.........................................................................................................

26

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

Useful Links Useful Links Argonne National Laboratory Accelerator Sites Conferences Advanced Photon Source (APS) Argonne Wakefield Accelerator (AWA) Argonne Tandem Linear Accelerator System (ATLAS) High Energy Physics Division RIA (????) Link to JACoW (Joint Accelerator Conferences Website) Fermi National Accelerator Laboratory Fermilab-Argonne Collaboration Accelerator Physics Center Workshops Other Accelerator Institutes Energy Recovering Linacs Center for Advance Studies of Accelerators (Jefferson Labs) Center for Beam Physics (LBNL) Accelerator Test Facility (BNL) The Cockcroft Institute (Daresbury, UK) John Adams Institute (Rutherford, UK) ERL2009 to be held at Cornell ERL2007 ERL2005 DOE Laboratory with Accelerators Fermilab Stanford Linear Accelerator Center Brookhaven National Laboratory

27

WIPP - CBFO Accelerating Cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

more information, access DOE Environmental Management site at: http:www.em.doe.govclosure For more information regarding the Accelerating Cleanup: Paths to Closure, contact...

28

Environmental Assessment for the Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Environmental Assessment Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan at the Thomas Jefferson National Accelerator Facility Newport News, Virginia January 2007 U. S. Department of Energy Thomas Jefferson Site Office Newport News, VA DOE/EA-1534 January 2007 C:\TRANSFER\JANUARY 26 Final EA-1534-012607 (2).doc i TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................... 1 1.0 INTRODUCTION ...........................................................................................11 1.1 PREVIOUS ACTIONS....................................................................................11 1.2 SCOPE OF THIS PROPOSED ACTION .......................................................11

29

2011 Annual Planning Summary for Stanford Linear Accelerator...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Stanford Linear Accelerator Center Site Office (SLAC) 2011 Annual Planning Summary for Stanford Linear Accelerator Center Site Office (SLAC) The ongoing and projected Environmental...

30

Superfund accelerated cleanup model  

SciTech Connect

In an effort to speed and maximize cleanup of the worst sites first, the Environmental Protection Agency (EPA) developed the Superfund Accelerated Cleanup Model (SACM). SACM streamlines the Superfund process so hazardous waste sites can be addressed quicker and in a more cost effective manner. EPA Regional offices developed a number of pilot projects to test the principles of SACM. Although many pilots are underway in the Regions, the pilots described here involve four areas: accelerating cleanup through early actions; integrating site assessments; using Regional Decision Teams to establish priorities; and accelerating cleanup through the use of new technology.

Not Available

1994-08-01T23:59:59.000Z

31

PARTICLE ACCELERATOR  

DOE Patents (OSTI)

ABS>A combination of two accelerators, a cyclotron and a ring-shaped accelerator which has a portion disposed tangentially to the cyclotron, is described. Means are provided to transfer particles from the cyclotron to the ring accelerator including a magnetic deflector within the cyclotron, a magnetic shield between the ring accelerator and the cyclotron, and a magnetic inflector within the ring accelerator.

Teng, L.C.

1960-01-19T23:59:59.000Z

32

Can Accelerators Accelerate Learning?  

Science Conference Proceedings (OSTI)

The 'Young Talented' education program developed by the Brazilian State Funding Agency (FAPERJ)[1] makes it possible for high-schools students from public high schools to perform activities in scientific laboratories. In the Atomic and Molecular Physics Laboratory at Federal University of Rio de Janeiro (UFRJ), the students are confronted with modern research tools like the 1.7 MV ion accelerator. Being a user-friendly machine, the accelerator is easily manageable by the students, who can perform simple hands-on activities, stimulating interest in physics, and getting the students close to modern laboratory techniques.

Santos, A. C. F.; Fonseca, P.; Coelho, L. F. S. [Instituto de Fisica, Universidade Federal do Rio de Janeiro, Rio de Janeiro, RJ, Brazil, Caixa Postal 68528, 21941-972 (Brazil)

2009-03-10T23:59:59.000Z

33

PARTICLE ACCELERATOR  

DOE Patents (OSTI)

A fixed-field alternating gradient accelerator for simultaneous acceleration of two particle beams in opposite directions is described. (T.R.H.)

Ohkawa, T.

1959-06-01T23:59:59.000Z

34

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

Welcome Welcome In 2006, Argonne laboratory director Robert Rosner formed the AAI as a focal point for accelerator initiatives. The institute works to utilize Argonne's extensive accelerator resources, to enhance existing facilities, to determine the future of accelerator development and construction, and to oversee a dynamic and acclaimed accelerator physics portfolio. I invite you to look around the content of this web site. Accelerators at Argonne describes our rich heritage in this field, particularly with respect to the development and support of user facilities. Initiatives describes the things we are hoping to do, and Research & Development discusses our research portfolio. If you are a graduate or undergraduate student wishing to pursue a career in accelerator science or technology, please see Educational

35

Acceleration in astrophysics  

SciTech Connect

The origin of cosmic rays and applicable laboratory experiments are discussed. Some of the problems of shock acceleration for the production of cosmic rays are discussed in the context of astrophysical conditions. These are: The presumed unique explanation of the power law spectrum is shown instead to be a universal property of all lossy accelerators; the extraordinary isotropy of cosmic rays and the limited diffusion distances implied by supernova induced shock acceleration requires a more frequent and space-filling source than supernovae; the near perfect adiabaticity of strong hydromagnetic turbulence necessary for reflecting the accelerated particles each doubling in energy roughly 10{sup 5} to {sup 6} scatterings with negligible energy loss seems most unlikely; the evidence for acceleration due to quasi-parallel heliosphere shocks is weak. There is small evidence for the expected strong hydromagnetic turbulence, and instead, only a small number of particles accelerate after only a few shock traversals; the acceleration of electrons in the same collisionless shock that accelerates ions is difficult to reconcile with the theoretical picture of strong hydromagnetic turbulence that reflects the ions. The hydromagnetic turbulence will appear adiabatic to the electrons at their much higher Larmor frequency and so the electrons should not be scattered incoherently as they must be for acceleration. Therefore the electrons must be accelerated by a different mechanism. This is unsatisfactory, because wherever electrons are accelerated these sites, observed in radio emission, may accelerate ions more favorably. The acceleration is coherent provided the reconnection is coherent, in which case the total flux, as for example of collimated radio sources, predicts single charge accelerated energies much greater than observed.

Colgate, S.A.

1993-12-31T23:59:59.000Z

36

Acceleration Mechanisms  

E-Print Network (OSTI)

Glossary I. Background and context of the subject II. Stochastic acceleration III. Resonant scattering IV. Diffusive shock acceleration V. DSA at multiple shocks VI. Applications of DSA VII. Acceleration by parallel electric fields VIII. Other acceleration mechanisms IX. Future directions X. Appendix: Quasilinear equations XI. Bibliography

Melrose, D B

2009-01-01T23:59:59.000Z

37

FY 2006 Summary Table by Appropriation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appropriation Account Summary Appropriation Account Summary (dollars in thousands - OMB Scoring) FY 2004 FY 2005 FY 2006 Comparable Comparable Request to FY 2006 vs. FY 2005 Approp Approp Congress Energy And Water Development Energy Programs Energy supply....................................................................... Non-Defense site acceleration completion........................... Uranium enrichment D&D fund............................................ Non-Defense environmental services................................... Science................................................................................. Nuclear waste disposal......................................................... Departmental administration.................................................

38

FY 2005 Statistical Table  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statistical Table by Appropriation Statistical Table by Appropriation (dollars in thousands - OMB Scoring) Table of Contents Summary...................................................................................................... 1 Mandatory Funding....................................................................................... 3 Energy Supply.............................................................................................. 4 Non-Defense site acceleration completion................................................... 6 Uranium enrichment D&D fund.................................................................... 6 Non-Defense environmental services.......................................................... 6 Science.........................................................................................................

39

FY 2005 Volume 5  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

6 6 Volume 5 Environmental Management Environmental Management Defense Site Acceleration Completion Defense Site Acceleration Completion Defense Environmental Services Defense Environmental Services Non Non - - Defense Site Acceleration Completion Defense Site Acceleration Completion Non Non - - Defense Environmental Services Defense Environmental Services Uranium Enrichment Decontamination Uranium Enrichment Decontamination and Decommissioning Fund and Decommissioning Fund February 2004 Volume 5 Office of Management, Budget and Evaluation/CFO Department of Energy Department of Energy FY 2005 Congressional Budget FY 2005 Congressional Budget Request Request Environmental Management Environmental Management Defense Site Acceleration Completion Defense Site Acceleration Completion

40

Plasma Wakefield Acceleration  

NLE Websites -- All DOE Office Websites (Extended Search)

rpwa rpwa Sign In Launch the Developer Dashboard SLAC National Accelerator Laboratory DOE | Stanford | SLAC | SSRL | LCLS | AD | PPA | Photon Science | PULSE | SIMES FACET User Facility : FACET An Office of Science User Facility Search this site... Search Help (new window) Top Link Bar FACET User Facility FACET Home About FACET FACET Experimental Facilities FACET Users Research at FACET SAREC Expand SAREC FACET FAQs FACET User Facility Quick Launch FACET Users Home FACET Division ARD Home About FACET FACET News FACET Users FACET Experimental Facilities FACET Research Expand FACET Research FACET Images Expand FACET Images SAREC Expand SAREC FACET Project Site (restricted) FACET FAQs FACET Site TOC All Site Content Department of Energy Page Content Plasma Wakefield Acceleration

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Accelerator Need  

NLE Websites -- All DOE Office Websites (Extended Search)

Need for Large Accelerators An Article Written Originally for Midlevel Teachers Back In order to study small particles, a high energy beam of particles must be generated. The...

42

SLAC National Accelerator Laboratory - Accelerators and Society  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerators and Society PHOTO: An accelerator at SLAC. SLAC has been developing, running and studying the basic physics of particle accelerators for half a century. Thousands of...

43

SLAC National Accelerator Laboratory - Accelerator Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

physics. Today, the Accelerator Directorate operates and maintains SLAC's existing accelerators to provide the highest possible level of performance. Accelerator employees improve...

44

ION ACCELERATOR  

DOE Patents (OSTI)

An arrangement for the drift tubes in a linear accelerator is described whereby each drift tube acts to shield the particles from the influence of the accelerating field and focuses the particles passing through the tube. In one embodiment the drift tube is splii longitudinally into quadrants supported along the axis of the accelerator by webs from a yoke, the quadrants. webs, and yoke being of magnetic material. A magnetic focusing action is produced by energizing a winding on each web to set up a magnetic field between adjacent quadrants. In the other embodiment the quadrants are electrically insulated from each other and have opposite polarity voltages on adjacent quadrants to provide an electric focusing fleld for the particles, with the quadrants spaced sufficienily close enough to shield the particles within the tube from the accelerating electric field.

Bell, J.S.

1959-09-15T23:59:59.000Z

45

LINEAR ACCELERATOR  

DOE Patents (OSTI)

Improvements in linear particle accelerators are described. A drift tube system for a linear ion accelerator reduces gap capacity between adjacent drift tube ends. This is accomplished by reducing the ratio of the diameter of the drift tube to the diameter of the resonant cavity. Concentration of magnetic field intensity at the longitudinal midpoint of the external sunface of each drift tube is reduced by increasing the external drift tube diameter at the longitudinal center region.

Christofilos, N.C.; Polk, I.J.

1959-02-17T23:59:59.000Z

46

WIPP Accelerating Cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

ACCELERATING CLEANUP: ACCELERATING CLEANUP: PATHS TO CLOSURE CARLSBAD AREA OFFICE JUNE 1998 I. Operations/Field Overview CAO Mission The mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant (WIPP) for safe disposal of transuranic (TRU) waste and by establishing an effective system for management of TRU waste from generation to disposal. It includes personnel assigned to CAO, WIPP site operations, transportation, and other activities associated with the National TRU Program (NTP). The CAO develops and directs implementation of the TRU waste program, and assesses compliance with the program guidance, as well as the commonality of activities and assumptions among all TRU waste sites. NTP Program Management

47

Application Acceleration  

NLE Websites -- All DOE Office Websites (Extended Search)

Acceleration Acceleration on Current and Future Cray Platforms Alice Koniges, Robert Preissl, Jihan Kim, Lawrence Berkeley National Laboratory David Eder, Aaron Fisher, Nathan Masters, Velimir Mlaker, Lawrence Livermore National Laboratory Stephane Ethier, Weixing Wang, Princeton Plasma Physics Laboratory Martin Head-Gordon, University of California, Berkeley and Nathan Wichmann, Cray Inc. ABSTRACT: Application codes in a variety of areas are being updated for performance on the latest architectures. We describe current bottlenecks and performance improvement areas for applications including plasma physics, chemistry related to carbon capture and sequestration, and material science. We include a variety of methods including advanced hybrid parallelization using multi-threaded MPI, GPU acceleration, libraries and auto- parallelization compilers. KEYWORDS: hybrid

48

Compact accelerator  

DOE Patents (OSTI)

A compact linear accelerator having at least one strip-shaped Blumlein module which guides a propagating wavefront between first and second ends and controls the output pulse at the second end. Each Blumlein module has first, second, and third planar conductor strips, with a first dielectric strip between the first and second conductor strips, and a second dielectric strip between the second and third conductor strips. Additionally, the compact linear accelerator includes a high voltage power supply connected to charge the second conductor strip to a high potential, and a switch for switching the high potential in the second conductor strip to at least one of the first and third conductor strips so as to initiate a propagating reverse polarity wavefront(s) in the corresponding dielectric strip(s).

Caporaso, George J. (Livermore, CA); Sampayan, Stephen E. (Manteca, CA); Kirbie, Hugh C. (Los Alamos, NM)

2007-02-06T23:59:59.000Z

49

MUON ACCELERATION  

Science Conference Proceedings (OSTI)

One of the major motivations driving recent interest in FFAGs is their use for the cost-effective acceleration of muons. This paper summarizes the progress in this area that was achieved leading up to and at the FFAG workshop at KEK from July 7-12, 2003. Much of the relevant background and references are also given here, to give a context to the progress we have made.

BERG,S.J.

2003-11-18T23:59:59.000Z

50

What is an accelerator?  

NLE Websites -- All DOE Office Websites (Extended Search)

world of physics though, 'accelerator' means something a little more specific. Our accelerators are a whole class of machines that accelerate atoms, or more often, pieces of...

51

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne Accelerator Institute: Mission The mission of the Argonne Accelerator Institute is centered upon the following related goals: Locate next generation accelerator facilities...

52

Accelerators and the Accelerator Community  

Science Conference Proceedings (OSTI)

In this paper, standing back--looking from afar--and adopting a historical perspective, the field of accelerator science is examined. How it grew, what are the forces that made it what it is, where it is now, and what it is likely to be in the future are the subjects explored. Clearly, a great deal of personal opinion is invoked in this process.

Malamud, Ernest; Sessler, Andrew

2008-06-01T23:59:59.000Z

53

Market Acceleration | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Market Acceleration Market Acceleration Market Acceleration Photo of several men on a floating platform that is lowering monitoring tools into the ocean. The Water Power Program works to foster a commercial market for marine and hydrokinetic (MHK) energy devices in order to achieve its goal of the nation obtaining 15% of its electricity needs from all types of water power by 2030. Though marine and hydrokinetic energy is still in its infancy, the program is developing a robust portfolio of projects to accelerate wave, tidal and current project deployments and development of the MHK market in general. These projects include project siting activities, market assessments, environmental impact analyses, and research supporting technology commercialization. Learn more about the Water Power Program's work in the following areas of

54

SLAC National Accelerator Laboratory - Site Index  

NLE Websites -- All DOE Office Websites (Extended Search)

(Experimental Group K) Particle Physics and Astrophysics Faculty PEP-II PEP-II Luminosity Phonebook (SLAC Directory) Photon Science Directorate Planning and Assessment Office...

55

Accelerating Solutions  

NLE Websites -- All DOE Office Websites (Extended Search)

Solutions From vehicles on the road to the energy that powers them, Oak Ridge National Laboratory innovations are advancing American transportation. Oak Ridge National Laboratory is making an impact on everyday America by enhancing transportation choices and quality of life. Through strong collaborative partnerships with industry, ORNL research and development efforts are helping accelerate the deployment of a new generation of energy efficient vehicles powered by domestic, renewable, clean energy. EPA ultra-low sulfur diesel fuel rule ORNL and the National Renewable Energy Laboratory co-led a comprehensive research and test program to determine the effects of diesel fuel sulfur on emissions and emission control (catalyst) technology. In the course of this program, involving

56

Acceleration Modules in Linear Induction Accelerators  

E-Print Network (OSTI)

Linear Induction Accelerator (LIA) is a unique type of accelerator, which is capable to accelerate kiloAmpere charged particle current to tens of MeV energy. The present development of LIA in MHz busting mode and successful application into synchrotron broaden LIAs usage scope. Although transformer model is widely used to explain the acceleration mechanism of LIAs, it is not appropriate to consider the induction electric field as the field which accelerates charged particles for many modern LIAs. Authors examined the transition of the magnetic cores functions during LIA acceleration modules evolution, distinguished transformer type and transmission line type LIA acceleration modules, and reconsidered several related issues based on transmission line type LIA acceleration module. The clarified understanding should be helpful in the further development and design of the LIA acceleration modules.

Wang, Shaoheng

2013-01-01T23:59:59.000Z

57

DOE - Office of Legacy Management -- Fermi National Accelerator Laboratory  

Office of Legacy Management (LM)

Fermi National Accelerator Fermi National Accelerator Laboratory - 016 FUSRAP Considered Sites Site: Fermi National Accelerator Laboratory (016) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: Radioactive Materials Handled: Primary Radioactive Materials Handled: Radiological Survey(s): Site Status: This site began it's mission as a single-program research and development facility for the Atomic Energy Commission in 1972, when the first accelerator at the Laboratory began operations. The Laboratory¿s current mission is to conduct research in high energy physics under the direction of the Department of Energy's Office of Science. Clean-up of contamination at the site was completed in 1997. Also see Documents Related to Fermi National Accelerator Laboratory

58

Untitled Page -- Other Sites Summary  

Office of Legacy Management (LM)

Other Sites Summary Other Sites Summary Search Other Sites Considered Sites Other Sites All LM Quick Search All Other Sites 11 E (2) Disposal Cell - 037 ANC Gas Hills Site - 040 Argonne National Laboratory - West - 014 Bodo Canyon Cell - 006 Burro Canyon Disposal Cell - 007 Cheney Disposal Cell - 008 Chevron Panna Maria Site - 030 Clive Disposal Cell - 036 Commercial (Burial) Disposal Site Maxey Flats Disposal Site - KY 02 Conoco Conquista Site - 031 Cotter Canon City Site - 009 Dawn Ford Site - 038 EFB White Mesa Site - 033 Energy Technology Engineering Center - 044 Estes Gulch Disposal Cell - 010 Exxon Ray Point Site - 032 Fermi National Accelerator Laboratory - 016 Fernald Environmental Management Project - 027 Fort St Vrain - 011 Geothermal Test Facility - 001 Hecla Durita Site - 012

59

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

AAI Home AAI Home Welcome Accelerators at Argonne Mission Organization History Document Collection Conferences & Workshops Beams and Applications Seminar Argonne-Fermilab Collaboration Lee Teng Scholarship Program Useful Links Argonne Accelerator Institute In 2006, Argonne Laboratory Director Robert Rosner formed the AAI as a focal point for accelerator initiatives. The institute works to utilize Argonne's extensive accelerator resources, to enhance existing facilities, to determine the future of accelerator development and construction, and to oversee a dynamic and acclaimed accelerator physics portfolio. More Information for: Members * Students Industrial Collaborators - Working with Argonne Link to: Accelerators for America's Future Upcoming Events and News 4th International Particle Accelerator Conference (IPAC'13)

60

Science Accelerator Widget  

Office of Scientific and Technical Information (OSTI)

Science Accelerator Widget You can now explore multiple Science Accelerator features through the new tabbed widget. Download this tool via the 'Get Widget Options' link or by...

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerators at Argonne Argonne has a long and continuing history of participation in accelerator based, and user oriented facilities. The Zero-Gradient Synchrotron, which began...

62

Focusing in Linear Accelerators  

DOE R&D Accomplishments (OSTI)

Review of the theory of focusing in linear accelerators with comments on the incompatibility of phase stability and first-order focusing in a simple accelerator.

McMillan, E. M.

1950-08-24T23:59:59.000Z

63

RHIC Superconducting Accelerator and Electron Cooling Group  

NLE Websites -- All DOE Office Websites (Extended Search)

Organization Chart (PDF) Organization Chart (PDF) Accelerator R&D Division eRHIC R&D Energy Recovery Linac Photocathode R&D Superconducting RF Electron Cooling LARP Center for Accelerator Science and Education C-AD Accelerator R&D Division Superconducting RF Group Group Headed By: Sergey Belomestnykh This web site presents information on the Superconducting Accelerator and RHIC Electron Cooling Group, which is in the Accelerator R&D Division of the Collider-Accelerator Department of Brookhaven National Laboratory. Work is supported mainly by the Division of Nuclear Physics of the US Department of Energy. Upcoming Events: TBD Most recent events: 56 MHz 2nd External Review, March 8-9, 2011 External Review of the Energy Recovery Linac, February 17-18, 2010. Report of the Review Committee

64

Stimulus Funding Will Accelerate Cleanup In Idaho  

NLE Websites -- All DOE Office Websites (Extended Search)

STIMULUS FUNDING WILL STIMULUS FUNDING WILL ACCELERATE CLEANUP IN IDAHO Funding from the American Recovery and Reinvestment Act will do more than sustain employment at the U.S. Department of Energy's Idaho Site - it will accelerate cleanup. Click here to see larger image Inside the retrieval enclosure at Accelerated Retrieval Project-III Click on image to enlarge The Office of Environmental Management received $6 billon in additional funding under the "stimulus bill" passed earlier this year by Congress and signed by President Obama. The Idaho Site will receive $468 million of the EM funding. The funding will be used at DOE's Idaho Site to: Decontaminate and decommission buildings that have no useful mission. Accelerate removal of buried radioactive waste, which will be

65

SLAC National Accelerator Laboratory: SLAC Science Focus Area...  

NLE Websites -- All DOE Office Websites (Extended Search)

accelerated closure of costly large-scale DOE legacy site operations such as the Rocky Flats Environmental Technology Site1. The SLAC SFA is working to leverage SR studies to...

66

Science Accelerator : Your Selections  

NLE Websites -- All DOE Office Websites (Extended Search)

Your Selections Back To Previous Page Selections - of First Page Previous Page Next Page Last Page Back To Previous Page You have 0 selections. Click the checkboxes clipping.addClipping on the results or alert results pages to add to your selections. Some links on this page may take you to non-federal websites. Their policies may differ from this site. U.S. Department of Energy U.S. Department of Energy Office of Science Office of Scientific and Technical Information Website Policies/Important Links Science Accelerator science.gov WorldWideScience.org Deep Web Technologies Email Results Use this form to email your search results * Email this to: * Your Name: Comments: URL only?: Number of results: 10 20 50 100 200 All Email Format: HTML TEXT * Required field Print Results

67

Accelerator and Fusion Research Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Outreach and Diversity Highlights Safety Other Sites and Labs Intramural Outreach and Diversity Highlights Safety Other Sites and Labs Intramural Historical photo of Laboratory founder and cyclotron inventor Ernest Orlando Lawrence at his desk OUR SCIENTIFIC PROGRAMS Accelerator Physics for the ALS Center for Beam Physics LOASIS Laboratory Fusion Science and Ion Beam Technology Superconducting Magnets Free Electron Laser R&D News: AFRD's Jean-Luc Vay and former AFRD scientist Kwang-Je Kim share the US Particle Accelerator School Prize. Andre Anders places two articles among the year's top 30 in the Journal of Applied Physics. AFRD personnel win an R&D 100 in a joint project with industry; the laser at the heart of BELLA sets a world record for laser power. Employees: Safety tips regarding the mountain lion are available. The results from our two most recent Self-Assessment Focus Groups are up, covering emergency preparedness and ergonomics while working offsite.

68

NIST MIRF - Accelerator Radiation Physics  

Science Conference Proceedings (OSTI)

Accelerator Radiation Physics. Medium-energy accelerators are under investigation for production of channeling radiation ...

69

Fermilab | Illinois Accelerator Research Center | Illinois Accelerator  

NLE Websites -- All DOE Office Websites (Extended Search)

photo: IARC photo: IARC As envisioned, the Illinois Accelerator Research Center will provide approximately 83,000 square feet of technical, office and classroom space for scientists and industrial partners. The Illinois Accelerator Research Center (IARC) is a new accelerator research facility being built at Fermi National Accelerator Laboratory. At the Illinois Accelerator Research Center, scientists and engineers from Fermilab, Argonne and Illinois universities will work side by side with industrial partners to research and develop breakthroughs in accelerator science and translate them into applications for the nation's health, wealth and security. Located on the Fermilab campus this 83,000 square foot, state-of-the-art facility will house offices, technical and educational space to study

70

The Office of Environmental Management Non-Defense Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Microsoft Word - PSRP Updates 6-25-10v2 The Office of Environmental Management (EM) Defense Environmental Cleanup The Office of Environmental Management Uranium Enrichment D&D...

71

SLAC National Accelerator Laboratory - SLAC National Accelerator...  

NLE Websites -- All DOE Office Websites (Extended Search)

Security Notice and Terms of Use Updated January 3, 2005 PRIVACY NOTICE Welcome to the SLAC National Accelerator Laboratory website. We collect no personal information about you...

72

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

Research and Development Research and Development Click to download a PDF version of this document. PDF Focus Research Areas Fundamental Accelerator Physics: Theory Importance Accelerator physics research is normally associated with specific accelerator projects. As a scientific discipline, however, it is useful to study fundamental accelerator phenomena decoupled, as much as possible, from specific project aspects. Pursuit of fundamental accelerator physics in this sense has contributed significantly to the advance of the accelerator physics knowledgebase during the last several decades, clarifying the limitations and suggesting ways to overcome those limitations. Such basic research tends to be discouraged in a project-driven environment. For sustained and significant progress in

73

Acceleration Of Wound Healing Ny Photodynamic Therapy  

DOE Patents (OSTI)

Disclosed is a method for accelerating wound healing in a mammal. The method includes identifying an unhealed wound site or partially-healed wound site in a mammal; administering a photosensitizer to the mammal; waiting for a time period wherein the photosensitizer reaches an effective tissue concentration at the wound site; and photoactivating the photosensitizer at the wound site. The dose of photodynamic therapy is selected to stimulate the production of one or more growth factor by cells at the wound site, without causing tissue destruction.

Hasan, Tayyaba (Arlington, MA); Hamblin, Michael R. (Revere, MA); Trauner, Kenneth (Sacramento, CA)

2000-08-22T23:59:59.000Z

74

Muon Collider Progress: Accelerators  

SciTech Connect

A muon collider would be a powerful tool for exploring the energy-frontier with leptons, and would complement the studies now under way at the LHC. Such a device would offer several important benefits. Muons, like electrons, are point particles so the full center-of-mass energy is available for particle production. Moreover, on account of their higher mass, muons give rise to very little synchrotron radiation and produce very little beamstrahlung. The first feature permits the use of a circular collider that can make efficient use of the expensive rf system and whose footprint is compatible with an existing laboratory site. The second feature leads to a relatively narrow energy spread at the collision point. Designing an accelerator complex for a muon collider is a challenging task. Firstly, the muons are produced as a tertiary beam, so a high-power proton beam and a target that can withstand it are needed to provide the required luminosity of ~1 × 10{sup 34} cm{sup –2}s{sup –1}. Secondly, the beam is initially produced with a large 6D phase space, which necessitates a scheme for reducing the muon beam emittance (“cooling”). Finally, the muon has a short lifetime so all beam manipulations must be done very rapidly. The Muon Accelerator Program, led by Fermilab and including a number of U.S. national laboratories and universities, has undertaken design and R&D activities aimed toward the eventual construction of a muon collider. Design features of such a facility and the supporting R&D program are described.

Zisman, Michael S.

2011-09-10T23:59:59.000Z

75

RHIC | Accelerator Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

RHIC Accelerators RHIC Accelerators The Relativistic Heavy Ion Collider complex is actually composed of a long "chain" of particle accelerators Heavy ions begin their travels in the Electron Beam Ion Source accelerator (1). The ions then travel to the small, circular Booster (3) where, with each pass, they are accelerated to higher energy. From the Booster, ions travel to the Alternating Gradient Synchrotron (4), which then injects the beams via a beamline (5) into the two rings of RHIC (6). In RHIC, the beams get a final accelerator "kick up" in energy from radio waves. Once accelerated, the ions can "orbit" inside the rings for hours. RHIC can also conduct colliding-beam experiments with polarized protons. These are first accelerated in the Linac (2), and further in the Booster (3), AGS (4), and

76

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

GEM - GeV Electron Microtron (design report 1982) The GEM design report describes a novel six-sided CW microtron for accelerating electrons to 4 GeV. This accelerator design was...

77

Accelerating Electric Vehicle Deployment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Electric Vehicle Deployment Accelerating Electric Vehicle Deployment Accelerating Electric Vehicle Deployment Accelerating Electric Vehicle Deployment More Documents &...

78

Far field acceleration  

SciTech Connect

Far fields are propagating electromagnetic waves far from their source, boundary surfaces, and free charges. The general principles governing the acceleration of charged particles by far fields are reviewed. A survey of proposed field configurations is given. The two most important schemes, Inverse Cerenkov acceleration and Inverse free electron laser acceleration, are discussed in detail.

Fernow, R.C.

1995-07-01T23:59:59.000Z

79

What is an accelerator operator?  

NLE Websites -- All DOE Office Websites (Extended Search)

is an accelerator operator? First I'll explain the education one must have in order to be considered for an Accelerator Operator position. Jefferson Lab's typical Accelerator...

80

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

AAI Homepage Lee Teng Scholarship Program USPAS Argonne Department of Education Fermilab Education Office For Students Many scientific advances are made using accelerators. The world of High Energy Particle Physics has driven this field and continues to depend largely on accelerators. Increasingly advances in materials science, chemistry, biology and environmental science are being made at accelerators using x-ray and neutrons to probe matter. Accelerators have a number of commercial applications including isotope production for use in medicine, cancer treatment, processing semiconductor chips, and so on. Presently there are around 15,000 accelerators worldwide. Approximately 97% of these are used for commercial applications. However several hundred are in use

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

SLAC National Accelerator Laboratory - Director of Accelerator...  

NLE Websites -- All DOE Office Websites (Extended Search)

Committee on Appropriations asked the US Department of Energy (DOE) to submit a strategic plan for accelerator R&D by June 2012. The DOE asked me to lead a task force to...

82

High brightness electron accelerator  

DOE Patents (OSTI)

A compact high brightness linear accelerator is provided for use, e.g., in a free electron laser. The accelerator has a first plurality of acclerating cavities having end walls with four coupling slots for accelerating electrons to high velocities in the absence of quadrupole fields. A second plurality of cavities receives the high velocity electrons for further acceleration, where each of the second cavities has end walls with two coupling slots for acceleration in the absence of dipole fields. The accelerator also includes a first cavity with an extended length to provide for phase matching the electron beam along the accelerating cavities. A solenoid is provided about the photocathode that emits the electrons, where the solenoid is configured to provide a substantially uniform magnetic field over the photocathode surface to minimize emittance of the electrons as the electrons enter the first cavity.

Sheffield, R.L.; Carlsten, B.E.; Young, L.M.

1992-12-31T23:59:59.000Z

83

Particle Physics Education Sites  

NLE Websites -- All DOE Office Websites (Extended Search)

쭺-¶ 쭺-¶ Particle Physics Education Sites ¡]¥H¤U¬°¥~¤åºô¯¸¡^ quick reference Education and Information - National Laboratory Education Programs - Women and Minorities in Physics - Other Physics Sites - Physics Alliance - Accelerators at National Laboratories icon Particle Physics Education and Information sites: top Introduction: The Particle Adventure - an interactive tour of particle physics for everyone: the basics of theory and experiment. Virtual Visitor Center of the Stanford Linear Accelerator Center. Guided Tour of Fermilab, - overviews of several aspects of Particle Physics. Also check out Particle Physics concepts. Probing Particles - a comprehensive and straight-forward introduction to particle physics. Big Bang Science - approaches particle physics starting from the theoretical origin of the universe.

84

Two Years Later: Bill Picciano of DOE's Savannah River Site ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site (SRS) - a job funded by the Recovery Act to accelerate the cleanup of the former nuclear weapons research site and make the site safe for future generations. Like too many...

85

Accelerating cleanup: Paths to closure  

SciTech Connect

This report describes the status of Environmental Management`s (EM`s) cleanup program and a direction forward to complete achievement of the 2006 vision. Achieving the 2006 vision results in significant benefits related to accomplishing EM program objectives. As DOE sites accelerate cleanup activities, risks to public health, the environment, and worker safety and health are all reduced. Finding more efficient ways to conduct work can result in making compliance with applicable environmental requirements easier to achieve. Finally, as cleanup activities at sites are completed, the EM program can focus attention and resources on the small number of sites with more complex cleanup challenges. Chapter 1 describes the process by which this report has been developed and what it hopes to accomplish, its relationship to the EM decision-making process, and a general background of the EM mission and program. Chapter 2 describes how the site-by-site projections were constructed, and summarizes, for each of DOE`s 11 Operations/Field Offices, the projected costs and schedules for completing the cleanup mission. Chapter 3 presents summaries of the detailed cleanup projections from three of the 11 Operations/Field Offices: Rocky Flats (Colorado), Richland (Washington), and Savannah River (South Carolina). The remaining eight Operations/Field Office summaries are in Appendix E. Chapter 4 reviews the cost drivers, budgetary constraints, and performance enhancements underlying the detailed analysis of the 353 projects that comprise EM`s accelerated cleanup and closure effort. Chapter 5 describes a management system to support the EM program. Chapter 6 provides responses to the general comments received on the February draft of this document.

NONE

1998-06-01T23:59:59.000Z

86

Plasma Focusing & Dielectric Wakefield Acceleration  

NLE Websites -- All DOE Office Websites (Extended Search)

pf pf Sign In Launch the Developer Dashboard SLAC National Accelerator Laboratory DOE | Stanford | SLAC | SSRL | LCLS | AD | PPA | Photon Science | PULSE | SIMES FACET User Facility : FACET An Office of Science User Facility Search this site... Search Help (new window) Top Link Bar FACET User Facility FACET Home About FACET FACET Experimental Facilities FACET Users Research at FACET SAREC Expand SAREC FACET FAQs FACET User Facility Quick Launch FACET Users Home FACET Division ARD Home About FACET FACET News FACET Users FACET Experimental Facilities FACET Research Expand FACET Research FACET Images Expand FACET Images SAREC Expand SAREC FACET Project Site (restricted) FACET FAQs FACET Site TOC All Site Content Department of Energy Page Content Plasma Focusing & Dielectric Wakefield Acceleration

87

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

Mission Mission The mission of the Argonne Accelerator Institute is centered upon the following related goals: Locate next generation accelerator facilities in Northern Illinois Advance accelerator technology Oversee a selected, strategic, lab-wide, and acclaimed accelerator R&D portfolio In order to accomplish the above goals, the institute has established five objectives. These are coupled to programmatic objectives, and are dependent on each other, but they serve to identify important areas for the institute to focus its activities. Educate the "next generation" of accelerator physicists and engineers Work with area Universities to establish Joint Appointments and Adjunct Professorships Identify students Provide research opportunities at Argonne Work with the US Particle Accelerator School

88

BNL | Accelerator Test Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerator Test Facility Accelerator Test Facility Home Core Capabilities Photoinjector S-Band Linac Laser Systems CO2 Laser Nd:Yag Laser Beamlines Beamline Simulation Data Beamline Parameters Beam Diagnostics Detectors Beam Schedule Operations Resources Fact Sheet (.pdf) Image Library Upgrade Proposal (.pdf) Publications ES&H Experiment Start-up ATF Handbook Laser Safety Collider-Accelerator Dept. C-AD ES&H Resources Staff Users' Place Apply for Access ATF photo ATF photo ATF photo ATF photo ATF photo A user facility for advanced accelerator research The Brookhaven Accelerator Test Facility (ATF) is a proposal driven, steering committee reviewed facility that provides users with high-brightness electron- and laser-beams. The ATF pioneered the concept of a user facility for studying complex properties of modern accelerators and

89

North Linear Accelerator  

NLE Websites -- All DOE Office Websites (Extended Search)

North Linear Accelerator North Linear Accelerator Building Exterior Beam Enclosure Level Walk to the North Spreader North Recombiner Extras! North Linear Accelerator The North Linear Accelerator is one of the two long, straight sections of Jefferson Lab's accelerator. Electrons gain energy in this section by passing through acceleration cavities. There are 160 cavities in this straightaway, all lined up end to end. That's enough cavities to increase an electron's energy by 400 million volts each time it passes through this section. Electrons can pass though this section as many as five times! The cavities are powered by microwaves that travel down the skinny rectangular pipes from the service buildings above ground. Since the cavities won't work right unless they are kept very cold, they

90

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

The Argonne Accelerator History Document Collection The Argonne Accelerator History Document Collection The Argonne Accelerator Institute (AAI) has established a special collection of archived documents which describe notable Argonne accelerator work of the past 50 years. A list of such Argonne Accelerator Projects is given below. Each project is described briefly, with links to archived documents in this collection. This collection includes important Argonne accelerator documents which may have become difficult to locate, as well as ones which have broad scope. In keeping with its historical purpose, this collection only covers work done 10 or more years ago. Many of the listed documents are available online. We hope to make more of them available online in the future. [For several of the projects, interesting additional online documents can be found by

91

accelerators for ATI  

NLE Websites -- All DOE Office Websites (Extended Search)

Building Accelerator Analogs Building Accelerator Analogs Some QuarkNet centers have built "accelerators." No, they are not real but can be used as analogs to real particle accelerators. The real learning comes, of course, when you plan and experiment on your own, but this may give you some starting points. Things to Think About What are your objectives? To make an analogy for particle accelerators? To use classical physics qualitatively? To use classical physics quantitatively? To measure forces, speed, etc.? _______________ Who is your target audience— in an Associate Teacher Institute or their students or both? What do the participants need to know before beginning? Jawbreaker Accelerator Pressurized gas shoots jawbreakers through PVC pipe into a fixed target (brick) or into each other. The original speeds and masses are measured as are those of the resulting particles.

92

AFRD - Advanced Light Source Accelerator Physics  

NLE Websites -- All DOE Office Websites (Extended Search)

ALS Accelerator Physics ALS Accelerator Physics Home Organization Outreach and Diversity News Highlights Safety Links Intramural FPO Accelerator Physics Group This page and the Group's own site emphasize the continuing effort to improve the performance and versatility of the accelerator-related systems of the ALS. If you want to start with a nontechnical explanation of what synchrotron light is, how scientists use it, and how the Advanced Light Source works, try About the ALS. The research performed using beams from the ALS is a vast topic that spans many scientific disciplines; a good overview with in-depth links is available at the ALS Science Briefs page. The ALS is a “” synchrotron light source based on a low-emittance electron storage ring with a nominal energy of 1.9 GeV. Since the machine

93

Accelerating Offshore Wind Development | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Offshore Wind Development Accelerating Offshore Wind Development Accelerating Offshore Wind Development Click on a project for more information. The Energy Department has selected seven projects that will accelerate the commercialization of innovative offshore wind technologies in the United States. Each project will receive up to $4 million from the Energy Department to complete the engineering, site evaluation, and planning phase of their project. Upon completion of this phase, the Energy Department will select the up to three of these projects to advance the follow-on design, fabrication, and deployment phases to achieve commercial operation by 2017. Each of the these projects will be eligible for up to $47 million in additional funding over four years, subject to Congressional appropriations. This map also includes 42

94

Independent Oversight Inspection, Thomas Jefferson National Accelerator  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Thomas Jefferson National Thomas Jefferson National Accelerator Facility - August 2008 Independent Oversight Inspection, Thomas Jefferson National Accelerator Facility - August 2008 August 2008 Inspection of Environment, Safety and Health Programs at the Thomas Jefferson National Accelerator Facility The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security (HSS), inspected environment, safety, and health (ES&H) programs at the DOE Thomas Jefferson Site Office (TJSO) and the Thomas Jefferson National Accelerator Facility (TJNAF) during May through July 2008. The ES&H inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. In coordination with TJSO, TJNAF has taken a number of actions to develop a

95

Electron acceleration in solar noise storms  

E-Print Network (OSTI)

We present an up-to-date review of the physics of electron acceleration in solar noise storms. We describe the observed characteristics of noise storm emission, emphasizing recent advances in imaging observations. We briefly describe the general methodology of treating particle acceleration problems and apply it to the specific problem of electron acceleration in noise storms. We dwell on the issue of the efficiency of the overall noise storm emission process and outline open problems in this area. 1.1 Motivation: Noise storms are the most common form of meter wavelength radio emission from the solar corona. The nomenclature arises from hissing sounds produced in short-wave radio receivers, and was coined around the 1930s. Noise storms are sites of long-lasting quasi-continuous electron acceleration in the

Prasad Subramanian

2007-01-01T23:59:59.000Z

96

Optically pulsed electron accelerator  

DOE Patents (OSTI)

An optically pulsed electron accelerator can be used as an injector for a free electron laser and comprises a pulsed light source, such as a laser, for providing discrete incident light pulses. A photoemissive electron source emits electron bursts having the same duration as the incident light pulses when impinged upon by same. The photoemissive electron source is located on an inside wall of a radiofrequency-powered accelerator cell which accelerates the electron burst emitted by the photoemissive electron source.

Fraser, J.S.; Sheffield, R.L.

1985-05-20T23:59:59.000Z

97

Optically pulsed electron accelerator  

DOE Patents (OSTI)

An optically pulsed electron accelerator can be used as an injector for a free electron laser and comprises a pulsed light source, such as a laser, for providing discrete incident light pulses. A photoemissive electron source emits electron bursts having the same duration as the incident light pulses when impinged upon by same. The photoemissive electron source is located on an inside wall of a radio frequency powered accelerator cell which accelerates the electron burst emitted by the photoemissive electron source.

Fraser, John S. (Los Alamos, NM); Sheffield, Richard L. (Los Alamos, NM)

1987-01-01T23:59:59.000Z

98

ACCELERATION RESPONSIVE SWITCH  

DOE Patents (OSTI)

An acceleration-responsive device with dual channel capabilities whereby a first circuit is actuated upon attainment of a predetermined maximum acceleration level and when the acceleration drops to a predetermined minimum acceleriltion level another circuit is actuated is described. A fluid-damped sensing mass slidably mounted in a relatively frictionless manner on a shaft through the intermediation of a ball bushing and biased by an adjustable compression spring provides inertially operated means for actuating the circuits. (AEC)

Chabrek, A.F.; Maxwell, R.L.

1963-07-01T23:59:59.000Z

99

Science Accelerator : User Account  

NLE Websites -- All DOE Office Websites (Extended Search)

Energy Office of Science Office of Scientific and Technical Information Website PoliciesImportant Links Science Accelerator science.gov WorldWideScience.org Deep Web Technologies...

100

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

ICFA Beam Dynamics Mini-Workshop on DeflectingCrabbing Cavity Applications in Accelerators April 21-23, 2010, Cockcroft Institute, Daresbury Laboratory, Warrington, UK Sixth...

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

Welcome Accelerators at Argonne Mission Organization History Document Collection Conferences & Workshops Beams and Applications Seminar Argonne-Fermilab Collaboration Lee Teng...

102

Human Accelerator - Teacher Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

electrons. The cavities are arranged in two long, straight sections called Linear Accelerators. In this activity, students pass tennis balls down a line like Jefferson Lab's...

103

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

(1971). (Located in the Argonne Research Library) Lee Teng Autobiography: Accelerators and I, Beam Dynamics Newsletter, No. 35, p 8-19, December (2004). (Located in Beam...

104

Market Acceleration (Fact Sheet)  

DOE Green Energy (OSTI)

The fact sheet summarizes the goals and activities of the DOE Solar Energy Technologies Program efforts within its market acceleration subprogram.

Not Available

2010-09-01T23:59:59.000Z

105

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

- Document Access Guide ATLAS: A Proposal for a Precision Heavy Ion Accelerator, Argonne National Laboratory, February (1978). (Located in the DOE Information Bridge) The...

106

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

Fermilab Collaboration Lee Teng Scholarship Program Useful Links Argonne Accelerator Institute: For Industrial Collaborators -- Working with Argonne This link is addressed to...

107

The Accelerator Chain  

NLE Websites -- All DOE Office Websites (Extended Search)

Watch video of Fermilab's Accelerators to learn more. Project Contact: Thomas Jordan - jordant@fnal.gov Web Maintainer: qnet-webmaster@fnal.gov Last Update: April 22, 2001...

108

Accelerating cleanup: Paths to closure  

SciTech Connect

This document was previously referred to as the Draft 2006 Plan. As part of the DOE`s national strategy, the Richland Operations Office`s Paths to Closure summarizes an integrated path forward for environmental cleanup at the Hanford Site. The Hanford Site underwent a concerted effort between 1994 and 1996 to accelerate the cleanup of the Site. These efforts are reflected in the current Site Baseline. This document describes the current Site Baseline and suggests strategies for further improvements in scope, schedule and cost. The Environmental Management program decided to change the name of the draft strategy and the document describing it in response to a series of stakeholder concerns, including the practicality of achieving widespread cleanup by 2006. Also, EM was concerned that calling the document a plan could be misconstrued to be a proposal by DOE or a decision-making document. The change in name, however, does not diminish the 2006 vision. To that end, Paths to Closure retains a focus on 2006, which serves as a point in time around which objectives and goals are established.

Edwards, C.

1998-06-30T23:59:59.000Z

109

Acceleration of polarized protons in circular accelerators  

SciTech Connect

The theory of depolarization in circular accelerators is presented. The spin equation is first expressed in terms of the particle orbit and then converted to the equivalent spinor equation. The spinor equation is then solved for three different situations: (1) a beam on a flat top near a resonance, (2) uniform acceleration through an isolated resonance, and (3) a model of a fast resonance jump. Finally, the depolarization coefficient, epsilon, is calculated in terms of properties of the particle orbit and the results are applied to a calculation of depolarization in the AGS.

Courant, E.D.; Ruth, R.D.

1980-09-12T23:59:59.000Z

110

Accelerators, Beams And Physical Review Special Topics - Accelerators And Beams  

SciTech Connect

Accelerator science and technology have evolved as accelerators became larger and important to a broad range of science. Physical Review Special Topics - Accelerators and Beams was established to serve the accelerator community as a timely, widely circulated, international journal covering the full breadth of accelerators and beams. The history of the journal and the innovations associated with it are reviewed.

Siemann, R.H.; /SLAC

2011-10-24T23:59:59.000Z

111

Accelerated cleanup risk reduction  

Science Conference Proceedings (OSTI)

There is no proven technology for remediating contaminant plume source regions in a heterogeneous subsurface. This project is an interdisciplinary effort to develop the requisite new technologies so that will be rapidly accepted by the remediation community. Our technology focus is hydrous pyrolysis/oxidation (HPO) which is a novel in situ thermal technique. We have expanded this core technology to leverage the action of steam injection and place an in situ microbial filter downstream to intercept and destroy the accelerated movement of contaminated groundwater. Most contaminant plume source regions, including the chlorinated solvent plume at LLNL, are in subsurface media characterized by a wide range in hydraulic conductivity. At LLNL, the main conduits for contaminant transport are buried stream channels composed of gravels and sands; these have a hydraulic conductivity in the range of 10{sup -1} to 10{sup -2} cm/s. Clay and silt units with a hydraulic conductivity of 10{sup -1} to 10{sup -6} cm/s bound these buried channels; these are barriers to groundwater movement and contain the highest contaminant concentrations in the source region. New remediation technologies are required because the current ones preferentially access the high conductivity units. HPO is an innovative process for the in situ destruction of contaminants in the entire subsurface. It operates by the injection of steam. We have demonstrated in laboratory experiments that many contaminants rapidly oxidize to harmless compounds at temperatures easily achieved by injecting steam, provided sufficient dissolved oxygen is present. One important challenge in a heterogeneous source region is getting heat, contaminants, and an oxidizing agent in the same place at the same time. We have used the NUFT computer program to simulate the cyclic injection of steam into a contaminated aquifer for design of a field demonstration. We used an 8 hour, steam/oxygen injection cycle followed by a 56 hour relaxation period in which the well was `capped`. Our results show the formation of an inclined gas phase during injection and a fast collapse of the steam zone within an hour of terminating steam injection. The majority of destruction occurs during the collapse phase, when contaminant laden water is drawn back towards the well. Little to no noncondensible gasses are created in this process, removing any possibility of sparging processes interfering with contaminant destruction. Our models suggest that the thermal region should be as hot and as large as possible. To have HPO accepted, we need to demonstrate the in situ destruction of contaminants. This requires the ability to inexpensively sample at depth and under high temperatures. We proved the ability to implies monitoring points at depths exceeding 150 feet in highly heterogeneous soils by use of cone penetrometry. In addition, an extractive system has been developed for sampling fluids and measuring their chemistry under the range of extreme conditions expected. We conducted a collaborative field test of HPO at a Superfund site in southern California where the contaminant is mainly creosote and pentachlorophenol. Field results confirm the destruction of contaminants by HPO, validate our field design from simulations, demonstrate that accurate field measurements of the critical fluid parameters can be obtained using existing monitoring wells (and minimal capital cost) and yield reliable cost estimates for future commercial application. We also tested the in situ microbial filter technology as a means to intercept and destroy the accelerated flow of contaminants caused by the injection of steam. A series of laboratory and field tests revealed that the selected bacterial species effectively degrades trichloroethene in LLNL Groundwater and under LLNL site conditions. In addition, it was demonstrated that the bacteria effectively attach to the LLNL subsurface media. An in-well treatability study indicated that the bacteria initially degrade greater than 99% of the contaminant, to concentrations less than regulatory limit

Knapp, R.B.; Aines, R.M.; Blake, R.G.; Copeland, A.B.; Newmark, R.L.; Tompson, A.F.B.

1998-02-01T23:59:59.000Z

112

Microscale acceleration history discriminators  

DOE Patents (OSTI)

A new class of micromechanical acceleration history discriminators is claimed. These discriminators allow the precise differentiation of a wide range of acceleration-time histories, thereby allowing adaptive events to be triggered in response to the severity (or lack thereof) of an external environment. Such devices have applications in airbag activation, and other safety and surety applications.

Polosky, Marc A. (Albuquerque, NM); Plummer, David W. (Albuquerque, NM)

2002-01-01T23:59:59.000Z

113

Collider-Accelerator Department  

NLE Websites -- All DOE Office Websites (Extended Search)

RHIC Tunnel and Magnets RHIC Tunnel and Magnets RHIC Tunnel and Magnets AGS Tunnel and Magnets NSRL Beamline RF Kicker Snake 200-MeV LINAC AGS Cold Snake Magnet About the Collider-Accelerator Department The mission of the Collider-Accelerator Department is to develop, improve and operate the suite of particle / heavy ion accelerators used to carry out the program of accelerator-based experiments at BNL; to support the experimental program including design, construction and operation of the beam transports to the experiments plus support of detector and research needs of the experiments; to design and construct new accelerator facilities in support of the BNL and national missions. The C-A Department supports an international user community of over 1500 scientists. The department performs all these functions in an environmentally responsible and safe manner under a rigorous conduct of operations approach.

114

Jar mechanism accelerator  

SciTech Connect

This patent describes an accelerator for use with a jar mechanism in a well pipe string to enhance the jarring impact delivered to a stuck object wherein the jar mechanism includes inner and outer members for connection, respectively, between the well pipe string the stuck object. The jar mechanism members are constructed to (1) restrict relative longitudinal movement therebetween to build up energy in the well pipe string and accelerator and then (2) to release the jar mechanism members for unrestrained, free relative longitudinal movement therebetween to engage jarring surfaces on the jar mechanism members for delivering a jarring impact to the stuck object. The accelerator includes: inner and outer telescopically connected members relatively movable longitudinally to accumulate energy in the accelerator; the inner and outer accelerator members each having means for connecting the accelerator in the well pipe string; means associated with the inner and outer members for initially accomodating a predetermined minimum length of unrestrained, free relative longitudinal movement between the inner and outer accelerator members.

Anderson, E.A.; Webb, D.D.

1989-07-11T23:59:59.000Z

115

BNL | Accelerating Particles Accelerates Science - With Big Benefits...  

NLE Websites -- All DOE Office Websites (Extended Search)

program focused on developing the next crop of bold accelerator scientists and engineers. Photo of CASE participants The Center for Accelerator Science and Education (CASE)...

116

Site Energy Reduction Program  

E-Print Network (OSTI)

DuPont’s Sabine River Works site is the largest energy consuming location within DuPont. In the year 2000, each production area was encouraged to reduce energy costs. By 2003 site energy consumption was down 16% on an absolute basis and 12% on a BTU/LB basis. By 2004, overall progress had slowed, energy consumption increased slightly, and area results were mixed. It was time to shake things up with a new perspective. A coordinated site energy program was launched. In 2005, the first full year of the unified program, the site saved $6.9 MM from energy reduction projects. The rate of improvement is accelerating in 2006 with $3.6 MM in energy projects being implemented in the first four months.

Jagen, P. R.

2007-01-01T23:59:59.000Z

117

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

AAI Home AAI Home Welcome Accelerators at Argonne Mission Organization History Document Collection Conferences & Workshops Beams and Applications Seminar Argonne-Fermilab Collaboration Lee Teng Scholarship Program Useful Links Organization The Argonne Accelerator Institute is a matrixed organization. Its members and fellows reside in programmatic Argonne divisions. The Institute reports to the Associate Laboratory Director for Photon Science), and the administrative functions of the Institute are within the PSC directorate. Director: Rodney Gerig Associate Director: Hendrik Weerts ( Director of High Energy Physics Division) Associate Director: Sasha Zholents (Director of Accelerator Systems Division) Associate Director: Robert Janssens ( Director of Argonne Physics Division)

118

The Fast Lane: Fermilab's Accelerators  

NLE Websites -- All DOE Office Websites (Extended Search)

Lane: Accelerators at Fermilab Introduction Introduction to Accelerators Accelerator Chain Cockcroft-Walton How it works How it looks Linac How it works How it looks Booster How it...

119

The Particle Adventure | Accelerators and Particle Detectors  

NLE Websites -- All DOE Office Websites (Extended Search)

Waves and particles The world's meterstick Mass and energy Energy-mass conversion Accelerators How to obtain particles to accelerate Accelerating particles Accelerating...

120

C-AD Accelerator Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerator Division Accelerator Division The Accelerator Division operates and continually upgrades a complex of eight accelerators: 2 Tandem Van de Graaff electrostatic accelerators, an Electron Beam Ion Source (EBIS), a 200 MeV proton Linac, the AGS Booster, the Alternating Gradient Synchrotron (AGS), and the 2 rings of the Relativistic Heavy Ion Collider (RHIC). These machines serve user programs at the Tandems, the Brookhaven Linac Isotope Producer (BLIP), the NASA Space Radiation Laboratory (NSRL), and the 2 RHIC experiments STAR, and PHENIX. The Division also supports the development of new accelerators and accelerator components. Contact Personnel Division Head: Wolfram Fischer Deputy Head: Joe Tuozzolo Division Secretary: Anna Petway Accelerator Physics: Michael Blaskiewicz

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Accelerated Aging of Roofing Surfaces  

NLE Websites -- All DOE Office Websites (Extended Search)

Ohio CRRC, Arizona CRRC, Florida CRRC, Ohio 6 | Building Technologies Office eere.energy.gov Approach: develop accelerated aging method Accelerated soiling (atmospheric...

122

Physics Out Loud - Particle Accelerator  

NLE Websites -- All DOE Office Websites (Extended Search)

Nucleus Previous Video (Nucleus) Physics Out Loud Main Index Next Video (Particle Resonance) Particle Resonance Particle Accelerator Andrew Hutton, Director of Accelerators at...

123

Linear Accelerator | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

electrons emitted from a cathode heated to 1100 C. The electrons are accelerated by high-voltage alternating electric fields in a linear accelerator (linac; photo below)....

124

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

Quarterly Meetings Quarterly Meetings November 29, 2011 Held at the Advanced Photon Source, Argonne, IL DOE Accelerator R&D Task Force - M. White February 17, 2010 Held at the Advanced Photon Source, Argonne, IL June 16, 2009 General Updates - R. Gerig Accelerator Developments in Physics Division - R. Janssens Proposal for Argonne SRF Facility - M. Kelly Accelerator Developments in HEP Division - W. Gai Beam Activities of the DOD Project Office-Focus on the Navy FEL - S. Biedron AAI Historical Collection - T. Fields November 24, 2008 Strategic Theme Forum Meeting - This meeting was held to gather information on the Accelerator Science and Technology Theme to establish the Argonne's Strategic Plan January 9, 2008 Opening Remarks - R. Gerig ILC Planning - J. Carwardine Argonne Participation in Project X - P. Ostroumov

125

Charged particle accelerator grating  

DOE Patents (OSTI)

A readily disposable and replaceable accelerator grating for a relativistic particle accelerator is described. The grating is formed for a plurality of liquid droplets that are directed in precisely positioned jet streams to periodically dispose rows of droplets along the borders of a predetermined particle beam path. A plurality of lasers are used to direct laser beams onto the droplets, at predetermined angles, thereby to excite the droplets to support electromagnetic accelerating resonances on their surfaces. Those resonances operate to accelerate and focus particles moving along the beam path. As the droplets are distorted or destroyed by the incoming radiation, they are replaced at a predetermined frequency by other droplets supplied through the jet streams.

Palmer, R.B.

1985-09-09T23:59:59.000Z

126

HEAVY ION LINEAR ACCELERATOR  

DOE Patents (OSTI)

A linear accelerator of heavy ions is described. The basic contributions of the invention consist of a method and apparatus for obtaining high energy particles of an element with an increased charge-to-mass ratio. The method comprises the steps of ionizing the atoms of an element, accelerating the resultant ions to an energy substantially equal to one Mev per nucleon, stripping orbital electrons from the accelerated ions by passing the ions through a curtain of elemental vapor disposed transversely of the path of the ions to provide a second charge-to-mass ratio, and finally accelerating the resultant stripped ions to a final energy of at least ten Mev per nucleon.

Van Atta, C.M.; Beringer, R.; Smith, L.

1959-01-01T23:59:59.000Z

127

CEBAF accelerator achievements  

Science Conference Proceedings (OSTI)

In the past decade, nuclear physics users of Jefferson Lab's Continuous Electron Beam Accelerator Facility (CEBAF) have benefited from accelerator physics advances and machine improvements. As of early 2011, CEBAF operates routinely at 6 GeV, with a 12 GeV upgrade underway. This article reports highlights of CEBAF's scientific and technological evolution in the areas of cryomodule refurbishment, RF control, polarized source development, beam transport for parity experiments, magnets and hysteresis handling, beam breakup, and helium refrigerator operational optimization.

Y.C. Chao, M. Drury, C. Hovater, A. Hutton, G.A. Krafft, M. Poelker, C. Reece, M. Tiefenback

2011-06-01T23:59:59.000Z

128

Accelerating Turing Machines  

Science Conference Proceedings (OSTI)

Accelerating Turing machines are Turing machines of a sort able to perform tasks that are commonly regarded as impossible for Turing machines. For example, they can determine whether or not the decimal representation of ? contains n consecutive 7s, ... Keywords: ?-machine, Chinese room argument, Church–Turing thesis, accelerating Turing machine, decision problem, effective procedure, halting problem, hypercomputation, hypercomputer, infinity machine, oracle machine, super-task

B. Jack Copeland

2002-05-01T23:59:59.000Z

129

Pantex Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Pantex Site Pantex Site The primary mission of the Pantex Plant is the assembly, disassembly, testing, and evaluation of nuclear wespons in support of the NNSA stockpile...

130

Plasma-based accelerator structures  

SciTech Connect

Plasma-based accelerators have the ability to sustain extremely large accelerating gradients, with possible high-energy physics applications. This dissertation further develops the theory of plasma-based accelerators by addressing three topics: the performance of a hollow plasma channel as an accelerating structure, the generation of ultrashort electron bunches, and the propagation of laser pulses is underdense plasmas.

Schroeder, Carl B.

1999-12-01T23:59:59.000Z

131

Collective Acceleration in Solar Flares  

E-Print Network (OSTI)

Laboratory UNIVERSITY OF CALIFORNIA Accelerator & FusionLaboratory, University of California, Berkeley, CA 94720 (2)

Barletta, W.

2008-01-01T23:59:59.000Z

132

Manhattan Project: Site Map  

Office of Scientific and Technical Information (OSTI)

SITE MAP SITE MAP Resources > Site Map THE MANHATTAN PROJECT Events 1890s-1939: Atomic Discoveries A Miniature Solar System, 1890s-1919 Exploring the Atom, 1919-1932 Atomic Bombardment, 1932-1938 The Discovery of Fission, 1938-1939 Fission Comes to America, 1939 1939-1942: Early Government Support Einstein's Letter, 1939 Early Uranium Research, 1939-1941 Piles and Plutonium, 1939-1941 Reorganization and Acceleration, 1940-1941 The MAUD Report, 1941 A Tentative Decision to Build the Bomb, 1941-1942 1942: Difficult Choices More Uranium Research, 1942 More Piles and Plutonium, 1942 Enter the Army, 1942 Groves and the MED, 1942 Picking Horses, November 1942 Final Approval to Build the Bomb, December 1942 1942-1944: The Uranium Path to the Bomb Y-12: Design, 1942-1943 Y-12: Construction, 1943

133

BNL | Our History: Accelerators  

NLE Websites -- All DOE Office Websites (Extended Search)

> See also: Reactors > See also: Reactors A History of Leadership in Particle Accelerator Design Cosmotron Cosmotron (1952-1966) Early in Brookhaven Lab history, the consortium of universities responsible for founding the new research center, decided that Brookhaven should provide leading facilities for high energy physics research. In April 1948, the Atomic Energy Commission approved a plan for a proton synchrotron to be built at Brookhaven. The new machine would accelerate protons to previously unheard of energies-comparable to the cosmic rays showering the earth's outer atmosphere. It would be called the Cosmotron. The Cosmotron was the first accelerator in the world to send particles to energies in the billion electron volt, or GeV, region. The machine reached its full design energy of 3.3 GeV in 1953.

134

Accelerator Update | Archive | 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

2 Accelerator Update Archive 2 Accelerator Update Archive April 27, 2012 - April 30, 2012 NuMI reported receiving 7.67E18 protons on target for the period from 4/23/12 to 4/30/12. The Booster developed an aperture restriction that required lower beam intensity Main Injector personnel completed their last study The shutdown begins Linac, MTA, and Booster will continue using beam for one or two more weeks Linac will supply the Neutron Therapy Facility beam for most of the shutdown April 25, 2012 - April 27, 2012 Booster beam stop problem repaired Beam to all experiments will shut off at midnight on Monday morning, 4/30/12. Main Injector will continue to take beam until 6 AM on Monday morning. Linac, the Neutron Therapy Facility, MTA, and Booster will continue using beam for one or two more weeks. The Fermi Accelerator Complex will be in shutdown for approximately one year

135

ORELA accelerator facility  

NLE Websites -- All DOE Office Websites (Extended Search)

The Oak Ridge Electron Linear Accelerator The Oak Ridge Electron Linear Accelerator Pulsed Neutron Source The ORELA is a powerful electron accelerator-based neutron source located in the Physics Division of Oak Ridge National Laboratory. It produces intense, nanosecond bursts of neutrons, each burst containing neutrons with energies from 10e-03 to 10e08 eV. ORELA is operated about 1200 hours per year and is an ORNL User Facility open to university, national laboratory and industrial scientists. The mission of ORELA has changed from a recent focus on applied research to nuclear astrophysics. This is an area in which ORELA has historically been very productive: most of the measurements of neutron capture cross sections necessary for understanding heavy element nucleosynthesis through the slow neutron capture process (s-process) have

136

Interfacing to accelerator instrumentation  

SciTech Connect

As the sensory system for an accelerator, the beam instrumentation provides a tremendous amount of diagnostic information. Access to this information can vary from periodic spot checks by operators to high bandwidth data acquisition during studies. In this paper, example applications will illustrate the requirements on interfaces between the control system and the instrumentation hardware. A survey of the major accelerator facilities will identify the most popular interface standards. The impact of developments such as isochronous protocols and embedded digital signal processing will also be discussed.

Shea, T.J.

1995-12-31T23:59:59.000Z

137

High intensity hadron accelerators  

SciTech Connect

This rapporteur report consists mainly of two parts. Part I is an abridged review of the status of all High Intensity Hadron Accelerator projects in the world in semi-tabulated form for quick reference and comparison. Part II is a brief discussion of the salient features of the different technologies involved. The discussion is based mainly on my personal experiences and opinions, tempered, I hope, by the discussions I participated in in the various parallel sessions of the workshop. In addition, appended at the end is my evaluation and expression of the merits of high intensity hadron accelerators as research facilities for nuclear and particle physics.

Teng, L.C.

1989-05-01T23:59:59.000Z

138

An accelerator technology legacy  

Science Conference Proceedings (OSTI)

Accelerator technology has been a major beneficiary of the investment made over the last decade. It is the intention of this paper to provide the reader with a glimpse of the broad nature of those advances. Development has been on a broad front and this paper can highlight only a few of those. Two spin-off applications will be outlined -- a concept for a compact, active, beam probe for solar body exploration and the concept for an accelerator-driven transmutation system for energy production.

Heighway, E.A.

1994-11-01T23:59:59.000Z

139

Accelerating News Issue 5  

E-Print Network (OSTI)

In this spring issue, we look at developments towards higher luminosity and higher energy colliders. We report on the technology developed for the remote powering of the LHC magnets and studies of diagnostics based on higher order mode port signals. We also inform you about the main outcome of the TIARA survey on market needs for accelerator scientists.

Szeberenyi, A

2013-01-01T23:59:59.000Z

140

Portable Linear Accelerator Development  

Science Conference Proceedings (OSTI)

This report describes Minac-3, a miniaturized linear accelerator system. It covers the current equipment capabilities and achievable modifications, applications information for prospective users, and technical information on high-energy radiography that is useful for familiarization and planning. The design basis, development, and applications history of Minac are also summarized.

1982-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

New Facility Saves $20 Million, Accelerates Waste Processing | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Facility Saves $20 Million, Accelerates Waste Processing Facility Saves $20 Million, Accelerates Waste Processing New Facility Saves $20 Million, Accelerates Waste Processing August 15, 2012 - 12:00pm Addthis The new Cask Processing Enclosure (CPE) facility is located at the Transuranic Waste Processing Center (TWPC). The Transuranic Waste Processing Center (TWPC) processes, repackages, and ships the site's legacy TRU waste offsite. OAK RIDGE, Tenn. - Oak Ridge's EM program recently began operations at a newly constructed facility that will accelerate the completion of remote-handled transuranic (TRU) waste processing at the site by two years and save taxpayers more than $20 million. The new Cask Processing Enclosure (CPE) facility is located at the Transuranic Waste Processing Center (TWPC). TWPC processes, repackages, and

142

FY 2005 Summary Table by Appropriation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

OMB Scoring) OMB Scoring) FY 2003 Comparable Approp FY 2004 Comparable Approp FY 2005 Congress Request Energy and Water Development Energy Programs Energy supply.............................................................. 730,215 788,620 835,266 +46,646 +5.9% Non-Defense site acceleration completion.................... 156,129 162,411 151,850 -10,561 -6.5% Uranium enrichment D&D fund.................................... 320,563 414,027 500,200 +86,173 +20.8% Non-Defense environmental services........................... 161,852 306,439 291,296 -15,143 -4.9% Science....................................................................... 3,322,244 3,500,169

143

Tightly Coupled Accelerators Architecture for Minimizing Communication Latency among Accelerators  

Science Conference Proceedings (OSTI)

In recent years, heterogeneous clusters using accelerators have been widely used in high performance computing systems. In such clusters, inter-node communication among accelerators requires several memory copies via CPU memory, and the communication ... Keywords: GPGPU, Accelerator Computing, Interconnection Network, PCI Express, Remote DMA, CUDA, GPU Direct

Toshihiro Hanawa, Yuetsu Kodama, Taisuke Boku, Mitsuhisa Sato

2013-05-01T23:59:59.000Z

144

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

FERMILAB Collaboration Webpage Argonne-Fermilab Collaboration Visitors to Argonne All Fermilab participants need an approved gate pass to access the Argonne Site. Please fill out...

145

Materials considerations in accelerator targets  

Science Conference Proceedings (OSTI)

Future nuclear materials production and/or the burn-up of long lived radioisotopes may be accomplished through the capture of spallation produced neutrons in accelerators. Aluminum clad-lead and/or lead alloys has been proposed as a spallation target. Aluminum was the cladding choice because of the low neutron absorption cross section, fast radioactivity decay, high thermal conductivity, and excellent fabricability. Metallic lead and lead oxide powders were considered for the target core with the fabrication options being casting or powder metallurgy (PM). Scoping tests to evaluate gravity casting, squeeze casting, and casting and swaging processes showed that, based on fabricability and heat transfer considerations, squeeze casting was the preferred option for manufacture of targets with initial core cladding contact. Thousands of aluminum clad aluminum-lithium alloy core targets and control rods for tritium production have been fabricated by coextrusion processes and successfully irradiated in the SRS reactors. Tritium retention in, and release from the coextruded product was modeled from experimental and operational data. Newly produced tritium atoms were trapped by lithium atoms to form a lithium tritide. The effective tritium pressure required for trap or tritide stability was the equilibrium decomposition pressure of tritium over a lithium tritide-aluminum mixture. The temperature dependence of tritium release was determined by the permeability of the cladding to tritium and the local equilibrium at the trap sites. The model can be used to calculate tritium release from aluminum clad, aluminum-lithium alloy targets during postulated accelerator operational and accident conditions. This paper describes the manufacturing technologies evaluated and presents the model for tritium retention in aluminum clad, aluminum-lithium alloy tritium production targets.

Peacock, H.B. Jr.; Iyer, N.C.; Louthan, M.R. Jr. [Westinghouse Savannah River Co., Aiken, SC (United States). Materials Technology Section

1994-08-01T23:59:59.000Z

146

Accelerations in Steep Gravity Waves  

Science Conference Proceedings (OSTI)

Surface accelerations can be measured in at least two ways: 1) by a fixed vertical wave guage, 2) by a free-floating buoy. This gives rise to two different vertical accelerations, called respectively “apparent” and “real”, or Langrangian. This ...

M. S. Longuet-Higgins

1985-11-01T23:59:59.000Z

147

BNL | Accelerators for Scientific Research  

NLE Websites -- All DOE Office Websites (Extended Search)

the development of the next crop of accelerator scientists and engineers, promises to train even more. With its history of building world-class accelerators and its proximity to...

148

SSRL Accelerator Phycics Home Page  

NLE Websites -- All DOE Office Websites (Extended Search)

(29047 bytes) ICFA2000t.gif (31362 bytes) Home Page LCLS Accelerator Physics at SSRL The field tha t can be covered by the Accelerator Physics activities at SSRL is limited...

149

Accelerator Update | Archive | 2010  

NLE Websites -- All DOE Office Websites (Extended Search)

10 Accelerator Update Archive 10 Accelerator Update Archive December 20, 2010 - December 22, 2010 - Three stores provided !32 hours of luminosity - Problems with two Linac quadrupole power supplies - Cryo system technicians work on TEV sector D1 wet engine - TEV quench during checkout - JASMIN's run at MTest ends December 17, 2010 - December 20, 2010 The Integrated Luminosity for the period from 12/13/10 to 12/20/10 was 66.31 inverse picobarns. NuMI reported receiving 7.62E18 protons on target during this same period. - Five Stores provided ~62 hours of luminosity - Operations had trouble with a Linac RF station (LRF3) - Operators tuned the Linac backup source (I- Source) December 15, 2010 - December 17, 2010 - Three stores provided ~36.1 hours of luminosity - MI-52 Septa repaired - NuMI recovered its target LCW system

150

ACCELERATOR SAFETY ENVELOPE  

NLE Websites -- All DOE Office Websites (Extended Search)

LCASE-001, Ver. 3 LCASE-001, Ver. 3 Linac Commissioning Accelerator Safety Envelope For the National Synchrotron Light Source II Photon Sciences Directorate Version 3 December 8, 2011 Prepared by Brookhaven National Laboratory P.O. Box 5000 Upton, NY 11973-5000 managed by Brookhaven Science Associates for the U.S. Department of Energy Office of Science Basic Energy Science under contract DE-AC02-98CD10886 Linac Commissioning Accelerator Safety Envelope (LCASE) ii Photon Sciences Directorate ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty,

151

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

CWDD - Continuous Wave Deuterium Demonstrator CWDD - Continuous Wave Deuterium Demonstrator The Continuous Wave Deuterium Demonstrator (CWDD) accelerator, a cryogenically-cooled (26K) linac, was designed to accelerate 80 mA cw of D to 7.5 MeV. CWDD was being built to demonstrate the lauching of a beam with characteristics suitable for a space-based neutral particle-beam (NPB). A considerable amount of hardware was constructed and installed in the Argonne-based facility, and major performance milestones were achieved before program funding ended in October 1993. References - Document Access Guide Continuous Wave Deuterium Demonstrator Final Design Review, Grumman Space Systems, Grumman-Culham Laboratory, Los Alamos (1989). (Located in the Argonne Research Library) Recommissioning and first operation of the CWDD injector at Argonne

152

Accelerator Update | Archive | 2009  

NLE Websites -- All DOE Office Websites (Extended Search)

9 Accelerator Update Archive 9 Accelerator Update Archive December 18, 2009 - December 21, 2009 The integrated luminosity for the period from 12/14/09 to 12/21/09 was 51.27 inverse picobarns. NuMI reported receiving 6.38E18 protons on target during this same period. - Four stores provided ~62.25 hours of luminosity - Store 7444 had an AIL of 306E30 - BRF19 cavity suffered a vacuum failure and was removed - The Booster West Anode Power Supply suffered some problems December 16, 2009 - December 18, 2009 - Three stores provided ~45 hours of luminosity - PBar kicker problem - MI RF problems December 14, 2009 - December 16, 2009 - Four stores provided ~42 hours of luminosity - Recycler kicker repaired - Booster East Anode Power Supply trips due to BRF1, 2, & 8 December 11, 2009 - December 14, 2009

153

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

ZGS -- Zero Gradient Synchrotron (operation: 1963 - 1979) ZGS -- Zero Gradient Synchrotron (operation: 1963 - 1979) The ZGS was a 12 GeV weak-focusing proton synchrotron. It was the first high energy physics accelerator located between the U.S. coasts. The ZGS was also the first synchrotron to accelerate spin polarized protons and the first to use H-minus injection. Other noteworthy features of the ZGS program were the large number of university-based users and the pioneering development of large superconducting magnets for bubble chambers and beam transport. References - Document Access Guide History of the ZGS, Argonne, 1979, American Institute of Physics, AIP Conference Proceedings No. 60 (1980). (Located in the Argonne Research Library) High Energy Physics at Argonne National Laboratory, A. Crewe, R.

154

ACCELERATOR SAFETY ENVELOPE  

NLE Websites -- All DOE Office Websites (Extended Search)

BCASE-001, Ver. 2 BCASE-001, Ver. 2 Booster Commissioning Accelerator Safety Envelope For the National Synchrotron Light Source II Photon Sciences Directorate Version 2 December 8, 2011 Prepared by Brookhaven National Laboratory P.O. Box 5000 Upton, NY 11973-5000 managed by Brookhaven Science Associates for the U.S. Department of Energy Office of Science Basic Energy Science under contract DE-AC02-98CD10886 Booster Commissioning Accelerator Safety Envelope (BCASE) ii Photon Sciences Directorate ii DISCLAIMER This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, nor any of their contractors, subcontractors, or their employees, makes any warranty,

155

Review of ion accelerators  

Science Conference Proceedings (OSTI)

The field of ion acceleration to higher energies has grown rapidly in the last years. Many new facilities as well as substantial upgrades of existing facilities have extended the mass and energy range of available beams. Perhaps more significant for the long-term development of the field has been the expansion in the applications of these beams, and the building of facilities dedicated to areas outside of nuclear physics. This review will cover many of these new developments. Emphasis will be placed on accelerators with final energies above 50 MeV/amu. Facilities such as superconducting cyclotrons and storage rings are adequately covered in other review papers, and so will not be covered here.

Alonso, J.

1990-06-01T23:59:59.000Z

156

Accelerators for Cancer Therapy  

DOE R&D Accomplishments (OSTI)

The vast majority of radiation treatments for cancerous tumors are given using electron linacs that provide both electrons and photons at several energies. Design and construction of these linacs are based on mature technology that is rapidly becoming more and more standardized and sophisticated. The use of hadrons such as neutrons, protons, alphas, or carbon, oxygen and neon ions is relatively new. Accelerators for hadron therapy are far from standardized, but the use of hadron therapy as an alternative to conventional radiation has led to significant improvements and refinements in conventional treatment techniques. This paper presents the rationale for radiation therapy, describes the accelerators used in conventional and hadron therapy, and outlines the issues that must still be resolved in the emerging field of hadron therapy.

Lennox, Arlene J.

2000-05-30T23:59:59.000Z

157

Research | SLAC National Accelerator Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerators and Society Astrophysics & Cosmology Biology Elementary Particle Physics Environmental Science Materials, Chemistry & Energy Sciences Scientific Computing X-ray...

158

History of Proton Linear Accelerators  

DOE R&D Accomplishments (OSTI)

Some personal recollections are presented that relate to the author`s experience developing linear accelerators, particularly for protons. (LEW)

Alvarez, L. W.

1987-01-00T23:59:59.000Z

159

Linear induction accelerator  

DOE Patents (OSTI)

A linear induction accelerator includes a plurality of adder cavities arranged in a series and provided in a structure which is evacuated so that a vacuum inductance is provided between each adder cavity and the structure. An energy storage system for the adder cavities includes a pulsed current source and a respective plurality of bipolar converting networks connected thereto. The bipolar high-voltage, high-repetition-rate square pulse train sets and resets the cavities. 4 figs.

Buttram, M.T.; Ginn, J.W.

1988-06-21T23:59:59.000Z

160

ION ACCELERATION SYSTEM  

DOE Patents (OSTI)

Well focused, intense ion beams are obtained by providing a multi- apertured source grid in front of an ion source chamber and an accelerating multi- apertured grid closely spaced from and in alignment with the source grid. The longest dimensions of the elongated apertures in the grids are normal to the direction of the magnetic field used with the device. Large ion currents may be withdrawn from the source, since they do not pass through any small focal region between the grids.

Luce, J.S.; Martin, J.A.

1960-02-23T23:59:59.000Z

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

ACCELERATION INTEGRATING MEANS  

DOE Patents (OSTI)

An acceleration responsive device is described. A housing has at one end normally open electrical contacts and contains a piston system with a first part of non-magnetic material having metering orifices in the side walls for forming an air bearing between it and the walls of the housing; this first piston part is normally held against the other end of the housing from the noted contacts by a second piston or reset part. The reset part is of partly magnetic material, is separable from the flrst piston part, and is positioned within the housing intermediate the contacts and the first piston part. A magnet carried by the housing imposes a retaining force upon the reset part, along with a helical compression spring that is between the reset part and the end with the contacts. When a predetermined acceleration level is attained, the reset part overcomes the bias or retaining force provided by the magnet and the spring'' snaps'' into a depression in the housing adjacent the contacts. The first piston part is then free to move toward the contacts with its movement responsive tc acceleration forces and the metering orifices. (AEC)

Wilkes, D.F.

1961-08-29T23:59:59.000Z

162

TRACKING ACCELERATOR SETTINGS.  

Science Conference Proceedings (OSTI)

Recording setting changes within an accelerator facility provides information that can be used to answer questions about when, why, and how changes were made to some accelerator system. This can be very useful during normal operations, but can also aid with security concerns and in detecting unusual software behavior. The Set History System (SHS) is a new client-server system developed at the Collider-Accelerator Department of Brookhaven National Laboratory to provide these capabilities. The SHS has been operational for over two years and currently stores about IOOK settings per day into a commercial database management system. The SHS system consists of a server written in Java, client tools written in both Java and C++, and a web interface for querying the database of setting changes. The design of the SHS focuses on performance, portability, and a minimal impact on database resources. In this paper, we present an overview of the system design along with benchmark results showing the performance and reliability of the SHS over the last year.

D OTTAVIO,T.; FU, W.; OTTAVIO, D.P.

2007-10-15T23:59:59.000Z

163

Berkeley Proton Linear Accelerator  

DOE R&D Accomplishments (OSTI)

A linear accelerator, which increases the energy of protons from a 4 Mev Van de Graaff injector, to a final energy of 31.5 Mev, has been constructed. The accelerator consists of a cavity 40 feet long and 39 inches in diameter, excited at resonance in a longitudinal electric mode with a radio-frequency power of about 2.2 x 10{sup 6} watts peak at 202.5 mc. Acceleration is made possible by the introduction of 46 axial "drift tubes" into the cavity, which is designed such that the particles traverse the distance between the centers of successive tubes in one cycle of the r.f. power. The protons are longitudinally stable as in the synchrotron, and are stabilized transversely by the action of converging fields produced by focusing grids. The electrical cavity is constructed like an inverted airplane fuselage and is supported in a vacuum tank. Power is supplied by 9 high powered oscillators fed from a pulse generator of the artificial transmission line type.

Alvarez, L. W.; Bradner, H.; Franck, J.; Gordon, H.; Gow, J. D.; Marshall, L. C.; Oppenheimer, F. F.; Panofsky, W. K. H.; Richman, C.; Woodyard, J. R.

1953-10-13T23:59:59.000Z

164

Accelerator Operations and Physics - Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerator Operations & Physics Accelerator Systems Division---Argonne National Laboratory Mission Statement Safe, reliable, attentive, and responsive operation of APS accelerator...

165

Accelerator and Beam Science, ABS, Accelerator Operations and Technology,  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerator Concepts Accelerator Concepts Injectors Operations Physics CONTACTS Group Leader Robert Garnett Deputy Group Leader Kenneth Johnson Office Administrator Monica Sanchez Phone: (505) 667-2846 Put a short description of the graphic or its primary message here Accelerator and Beam Science The Accelerator and Beam Science (AOT-ABS) Group at Los Alamos addresses physics aspects of the driver accelerator for the LANSCE spallation neutron source and related topics. These activities are wide ranging and include generating negative and positive ions in plasma ion sources, creating ion beams from these particles, accelerating the ion beams in linear accelerator structures up to an energy of 800 MeV, compressing the negative hydrogen beam to packets of sub-microsecond duration and accumulating beam current in the Proton Storage Ring, and

166

Estimating Dose Rates from Activated Groundwater at Accelerator Sites  

Science Conference Proceedings (OSTI)

Dose/Dose Rate / Special Issue on the 11th International Conference on Radiation Shielding and the 15th Topical Meeting of the Radiation Protection and Shielding Division (PART 3) / Radiation Protection

N. Prolingheuer; M. Herbst; B. Heuel-Fabianek; R. Moormann; R. Nabbi; B. Schlögl; J. Vanderborght

167

Site Map for the Science Accelerator, Office of Scientific and...  

NLE Websites -- All DOE Office Websites (Extended Search)

possible manner. If you can see this message, the page may not display as intended. Home Advanced Search Alerts About Federated Search Architecture Resources Card Fact Sheet...

168

Muon Acceleration - RLA and FFAG  

SciTech Connect

Various acceleration schemes for muons are presented. The overall goal of the acceleration systems: large acceptance acceleration to 25 GeV and 'beam shaping' can be accomplished by various fixed field accelerators at different stages. They involve three superconducting linacs: a single pass linear Pre-accelerator followed by a pair of multi-pass Recirculating Linear Accelerators (RLA) and finally a non-scaling FFAG ring. The present baseline acceleration scenario has been optimized to take maximum advantage of appropriate acceleration scheme at a given stage. The solenoid based Pre-accelerator offers very large acceptance and facilitates correction of energy gain across the bunch and significant longitudinal compression trough induced synchrotron motion. However, far off-crest acceleration reduces the effective acceleration gradient and adds complexity through the requirement of individual RF phase control for each cavity. The RLAs offer very efficient usage of high gradient superconducting RF and ability to adjust path-length after each linac pass through individual return arcs with uniformly periodic FODO optics suitable for chromatic compensation of emittance dilution with sextupoles. However, they require spreaders/recombiners switchyards at both linac ends and significant total length of the arcs. The non-scaling Fixed Field Alternating Gradient (FFAG) ring combines compactness with very large chromatic acceptance (twice the injection energy) and it allows for large number of passes through the RF (at least eight, possibly as high as 15).

Alex Bogacz

2011-10-01T23:59:59.000Z

169

Radiological Safety Training for Accelerator Facilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TS TS NOT MEASUREMENT SENSITIVE DOE-HDBK-1108-2002 May 2002 Reaffirmation with Change Notice 2 July 2013 DOE HANDBOOK RADIOLOGICAL SAFETY TRAINING FOR ACCELERATOR FACILITIES U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document is available on the Department of Energy Technical Standards Program Web Site at http://www.hss.energy.gov/nuclearsafety/techstds/ Change Notice No.2 Radiological Training for Accelerator Facilities Page/Section Change Throughout the document: Program Management Guide Instructor's Guide Student's Guide "Shall" and "Must" statements Revised to: Program Management Instructor's Material Student's Material Reworded to non-mandatory language unless associated with a requirement

170

Argonne Accelerator Institute  

NLE Websites -- All DOE Office Websites (Extended Search)

Fermilab Collaboration Fermilab Collaboration Lee Teng Scholarship Program Useful Links The Argonne Accelerator Institute Historical Document Collection Document Access Guide The documents in this collection are held in several repositories, some of which have restricted access. This guide explains the different types of access, and specifies the access levels for each repository. Repositories Name Access Argonne National Laboratory Document Open Access Argonne Research Library Hard Copy Only Beam Dynamics Newsletter Open Access DOE Information Bridge Open Access IEEE Xplore Library Subscription Required JACoW Open Access Journal of Applied Physics Subscription Required Nuclear Instruments & Methods in Physics Research, Section A Subscription Required Physical Review A Subscription Required

171

Accelerating Innovation Webinar Series - Energy Innovation Portal  

Accelerating Innovation Webinar Series. In partnership with the Battelle Commercialization Council, the Energy Innovation Portal is hosting an Accelerating Innovation ...

172

DOE - Office of Legacy Management -- Yale Heavy Ion Linear Accelerator - CT  

NLE Websites -- All DOE Office Websites (Extended Search)

Yale Heavy Ion Linear Accelerator - Yale Heavy Ion Linear Accelerator - CT 05 FUSRAP Considered Sites Site: Yale Heavy Ion Linear Accelerator (CT.05) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: New Haven , Connecticut CT.05-1 Evaluation Year: 1987 CT.05-3 Site Operations: Research and development with solvents. CT.05-1 Site Disposition: Eliminated - Potential for contamination remote based on limited amount of materials handled CT.05-3 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Radium CT.05-1 Radiological Survey(s): No Site Status: Eliminated from consideration under FUSRAP Also see Documents Related to Yale Heavy Ion Linear Accelerator CT.05-1 - MED Memorandum; To the Files, Thru Ruhoff, et. al.;

173

Broadband accelerator control network  

SciTech Connect

A broadband data communications network has been implemented at BNL for control of the Alternating Gradient Synchrotron (AG) proton accelerator, using commercial CATV hardware, dual coaxial cables as the communications medium, and spanning 2.0 km. A 4 MHz bandwidth Digital Control channel using CSMA-CA protocol is provided for digital data transmission, with 8 access nodes available over the length of the RELWAY. Each node consists of an rf modem and a microprocessor-based store-and-forward message handler which interfaces the RELWAY to a branch line implemented in GPIB. A gateway to the RELWAY control channel for the (preexisting) AGS Computerized Accelerator Operating system has been constructed using an LSI-11/23 microprocessor as a device in a GPIB branch line. A multilayer communications protocol has been defined for the Digital Control Channel, based on the ISO Open Systems Interconnect layered model, and a RELWAY Device Language defined as the required universal language for device control on this channel.

Skelly, J.; Clifford, T.; Frankel, R.

1983-01-01T23:59:59.000Z

174

University, Linear Accelerator  

E-Print Network (OSTI)

proposals for innovative, econanical, low head hydro power plant ides development. For this purpose, low head was defined as 3m or less. Early hydra power projects were small scale and very close to load centers. Inefficient paddlewheels turned shafts in udlls which, through belts, drove mill equipmt. With the advent of electrical wr, hydro power projects could be reasonably rarote from load centers and located at optimm sites of high head and intermediate flew or high flow and intermediate head. The best sites were quickly exploited and secondary sites became uneconanical. Secondary sites or those evenmre rmte fran load centers were then erploitedby public agencies and the ec onanics justified by power generation plus flood control and/or irrigation plus establistrnent of potable water reservoirs, to serve rapidly growing urban centers. Many of the earlier dams no longer were used to generate power as the mill-races vanished. Many nw low head dams were used for flood control and evening flows toward hydro ver ejects, and were not furnished with generators since these sites were even m3re rarPte

F. F. -hall; P. Box

1980-01-01T23:59:59.000Z

175

Medical Sites  

NLE Websites -- All DOE Office Websites (Extended Search)

Medical Sites Name: Jenielle Location: NA Country: NA Date: NA Question: I started itching Aug. 1999. Diagnosed with ITP Oct.1999. I am in remission With a platelet count in...

176

Hanford Site  

NLE Websites -- All DOE Office Websites

Around the Site Current HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Contacts Hours Current NWS Forecast for the Tri-Cities NWS...

177

Magnetic Insulation for Electrostatic Accelerators  

Science Conference Proceedings (OSTI)

The voltage gradient which can be sustained between electrodes without electrical breakdowns is usually one of the most important parameters in determining the performance which can be obtained in an electrostatic accelerator. We have recently proposed a technique which might permit reliable operation of electrostatic accelerators at higher electric field gradients, perhaps also with less time required for the conditioning process in such accelerators. The idea is to run an electric current through each accelerator stage so as to produce a magnetic field which envelopes each electrode and its electrically conducting support structures. Having the magnetic field everywhere parallel to the conducting surfaces in the accelerator should impede the emission of electrons, and inhibit their ability to acquire energy from the electric field, thus reducing the chance that local electron emission will initiate an arc. A relatively simple experiment to assess this technique is being planned. If successful, this technique might eventually find applicability in electrostatic accelerators for fusion and other applications.

Grisham, L. R. [Princeton Plasma Physics Laboratory, P. O. Box 451, Princeton, New Jersey 08543 (United States)

2011-09-26T23:59:59.000Z

178

WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING CLEANUP  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING CLEANUP WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING CLEANUP December 1, 2009 - 12:00pm Addthis Richland, WA - In direct support of Hanford cleanup and the American Reinvestment and Recovery Act (ARRA) accelerated cleanup initiatives, the U.S. Department of Energy (DOE) Richland Operations Office (RL) is teaming with the Site services contractor, Mission Support Alliance, LLC (MSA), CH2M HILL Plateau Remediation Company and Washington River Protection Services Company to implement a WiMAX-based communications infrastructure at Hanford to augment the existing fiber optic and Wi-Fi-based systems. Wi-Fi and WiMAX are both considered last mile technologies that carry signals from telecommunications backbones (in this case hubs or access

179

WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING CLEANUP  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING CLEANUP WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING CLEANUP December 1, 2009 - 12:00pm Addthis Richland, WA - In direct support of Hanford cleanup and the American Reinvestment and Recovery Act (ARRA) accelerated cleanup initiatives, the U.S. Department of Energy (DOE) Richland Operations Office (RL) is teaming with the Site services contractor, Mission Support Alliance, LLC (MSA), CH2M HILL Plateau Remediation Company and Washington River Protection Services Company to implement a WiMAX-based communications infrastructure at Hanford to augment the existing fiber optic and Wi-Fi-based systems. Wi-Fi and WiMAX are both considered last mile technologies that carry signals from telecommunications backbones (in this case hubs or access

180

Cast dielectric composite linear accelerator  

DOE Patents (OSTI)

A linear accelerator having cast dielectric composite layers integrally formed with conductor electrodes in a solventless fabrication process, with the cast dielectric composite preferably having a nanoparticle filler in an organic polymer such as a thermosetting resin. By incorporating this cast dielectric composite the dielectric constant of critical insulating layers of the transmission lines of the accelerator are increased while simultaneously maintaining high dielectric strengths for the accelerator.

Sanders, David M. (Livermore, CA); Sampayan, Stephen (Manteca, CA); Slenes, Kirk (Albuquerque, NM); Stoller, H. M. (Albuquerque, NM)

2009-11-10T23:59:59.000Z

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Site Map | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Welcome Welcome Visitor Information Job Openings Apply for Beam Time Machine Status | Schedule Conferences Seminars & Meetings Publications Safety and Training Construction Schedule Find People Organization Charts Email | WebVPN | Intranet APS Conference Rooms Suggestion Box Document Central Argonne Guest House external link Argonne Accelerator Inst. external link National User Facility Org. external link lightsources.org external link Facebook Twitter YouTube Wikipedia Site Map Looking for something else? Try a site search or contact webmaster for assistance. About Welcome Overview Visiting the APS Mission and Goals Organization Charts Committees Job Openings User Information For Prospective Users For New Users For Current Users For Administrators Find a Beamline Contacts Calendars Community

182

EV Technology Accelerates in Colorado | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EV Technology Accelerates in Colorado EV Technology Accelerates in Colorado EV Technology Accelerates in Colorado January 13, 2012 - 5:09pm Addthis Arun Majumdar speaks at Idaho National Lab (INL) during a visit to the site earlier this week. | Photo courtesy of INL. Arun Majumdar speaks at Idaho National Lab (INL) during a visit to the site earlier this week. | Photo courtesy of INL. April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs What does this mean for me? One of 48 advanced battery and electric drive projects across the country funded by Recovery Act. U.S. will have increased capacity to produce electric-drive vehicles batteries from virtually zero in 2008 up to 500,000 per year in 2015. While the North American International Auto Show began this week in

183

Challenges in Accelerator Beam Instrumentation  

E-Print Network (OSTI)

The challenges in beam instrumentation and diagnostics for present and future particle accelerator projects are presented. A few examples for advanced hadron and lepton beam diagnostics are given.

Wendt, M

2009-01-01T23:59:59.000Z

184

Challenges in Accelerator Beam Instrumentation  

Science Conference Proceedings (OSTI)

The challenges in beam instrumentation and diagnostics for present and future particle accelerator projects are presented. A few examples for advanced hadron and lepton beam diagnostics are given.

Wendt, M.

2009-12-01T23:59:59.000Z

185

Ultrafast Accelerators for Pulse Radiolysis  

NLE Websites -- All DOE Office Websites (Extended Search)

in this area agreed that it would be useful to organize a specialist's conference on ultrafast accelerators for pulse radiolysis, to discuss the common experiences and problems...

186

BNL | Accelerators for Scientific Research  

NLE Websites -- All DOE Office Websites (Extended Search)

for Basic Research Brookhaven National Lab excels at the design, construction, and operation of large-scale accelerator facilities, a tradition that started with the Cosmotron and...

187

Science at SLAC National Accelerator  

NLE Websites -- All DOE Office Websites (Extended Search)

matter and dark energy, and develop smaller, more efficient versions of particle accelerators widely used in research, medicine and industry. As our second half-century unfolds,...

188

Argonne's Accelerator Science and Technology  

NLE Websites -- All DOE Office Websites (Extended Search)

has significant expertise in modeling, design, and operation of both electron accelerators and free electron lasers; undulator design, fabrication, and measurement; control...

189

XML-based Test Accelerator  

Science Conference Proceedings (OSTI)

... A test accelerator that provides core reusable components, yet allows input and output formats to be defined by the user, will facilitate building ...

2011-12-02T23:59:59.000Z

190

SLAC National Accelerator Laboratory - Organization  

NLE Websites -- All DOE Office Websites (Extended Search)

Organization PHOTO: Aerial view of SLAC Campus SLAC National Accelerator Laboratory is operated by Stanford University for the U.S. Department of Energy's Office of Science. The...

191

Science Accelerator : User Login  

NLE Websites -- All DOE Office Websites (Extended Search)

Login Login The Science Accelerator ALERTS feature will automatically update you regarding newly available information in your specific area(s) of interest. Simply register for the service, then create a search strategy which will be run against information added to . Select a schedule (weekly, monthly, etc.) for receiving the email Alerts. If you are a new patron, Register to learn how to set up Alerts to meet your needs. If you are an existing patron, enter your user name and password in the boxes to login. Once logged in, you may review or modify your search, add a new search and see recent Alerts results. User Name: Password: Remember Me Remember me on this computer. Login Don't have a user name? Register! Forgot your password? Reset your password Alerts The Alerts function allows you to monitor a topic and receive timely

192

HIGH ENERGY PARTICLE ACCELERATOR  

DOE Patents (OSTI)

An improved apparatus is presented for focusing charged particles in an accelerator. In essence, the invention includes means for establishing a magnetic field in discrete sectors along the path of moving charged particles, the magnetic field varying in each sector in accordance with the relation. B = B/ sub 0/ STAln (r-r/sub 0/)/r/sub 0/!, where B/sub 0/ is the value of the magnetic field at the equilibrium orbit of radius r/sub 0/ of the path of the particles, B equals the magnetic field at the radius r of the chamber and n equals the magnetic field gradient index, the polarity of n being abruptly reversed a plurality of times as the particles travel along their arcuate path. With this arrangement, the particles are alternately converged towards the axis of their equillbrium orbit and diverged therefrom in successive sectors with a resultant focusing effect.

Courant, E.D.; Livingston, M.S.; Snyder, H.S.

1959-04-14T23:59:59.000Z

193

Accelerations in Steep Gravity Waves. II: Subsurface Accelerations  

Science Conference Proceedings (OSTI)

It is shown that the vertical acceleration of a particle beneath the crest of a step gravity wave does not always decrease monotonically with depth in the fluid. When the wave steepness ak exceeds 0.4, the acceleration at first increases with ...

M. S. Longuet-Higgins

1986-07-01T23:59:59.000Z

194

Site Map  

NLE Websites -- All DOE Office Websites (Extended Search)

Home » Site Map Home » Site Map Site Map Home About Overview NERSC Mission Contact us Staff Center Leadership Sudip Dosanjh Select Publications Jeff Broughton Katie Antypas John Shalf Francesca Verdier Center Administration James Craw Norma Early Jeff Grounds Betsy MacGowan Zaida McCunney Lynn Rippe Suzanne Stevenson David Tooker Center Communications Jon Bashor Linda Vu Margie Wylie Kathy Kincade Advanced Technologies Group Nicholas Wright Brian Austin Research Projects Matthew Cordery Christopher Daley Analytics Group Peter Nugent David Camp Hank Childs Harinarayan Krishnan Burlen Loring Joerg Meyer Prabhat Oliver Ruebel Daniela Ushizima Gunther Weber Yushu Yao Computational Systems Group Jay Srinivasan James Botts Scott Burrow Tina Butler Nick Cardo Tina Declerck Ilya Malinov David Paul Larry Pezzaglia Iwona Sakrejda

195

SPEAR3 Accelerator Physics Update  

NLE Websites -- All DOE Office Websites (Extended Search)

SPEAR3 ACCELERATOR PHYSICS UPDATE* SPEAR3 ACCELERATOR PHYSICS UPDATE* J. Safranek # , W.J. Corbett, R. Hettel, X. Huang, Y. Nosochkov, J. Sebek, A. Terebilo, SSRL/SLAC, Menlo Park, CA, U.S.A. Abstract The SPEAR3 [1,2] storage ring at Stanford Synchrotron Radiation Laboratory has been delivering photon beams for three years. We will give an overview of recent and ongoing accelerator physics activities, including 500 mA fills, work toward top-off injection, long-term orbit stability characterization and improvement, fast orbit feedback, new chicane optics, low alpha optics & short bunches, low emittance optics, and MATLAB software. The accelerator physics group has a strong program to characterize and improve SPEAR3 performance. INTRODUCTION In this summary of the past three years of accelerator

196

EXOTIC MAGNETS FOR ACCELERATORS.  

SciTech Connect

Over the last few years, several novel magnet designs have been introduced to meet the requirements of new, high performance accelerators and beam lines. For example, the FAIR project at GSI requires superconducting magnets ramped at high rates ({approx} 4 T/s) in order to achieve the design intensity. Magnets for the RIA and FAIR projects and for the next generation of LHC interaction regions will need to withstand high doses of radiation. Helical magnets are required to maintain and control the polarization of high energy protons at RHIC. In other cases, novel magnets have been designed in response to limited budgets and space. For example, it is planned to use combined function superconducting magnets for the 50 GeV proton transport line at J-PARC to satisfy both budget and performance requirements. Novel coil winding methods have been developed for short, large aperture magnets such as those used in the insertion region upgrade at BEPC. This paper will highlight the novel features of these exotic magnets.

WANDERER, P.

2005-09-18T23:59:59.000Z

197

RFQ accelerator tuning system  

DOE Patents (OSTI)

A cooling system is provided for maintaining a preselected operating temperature in a device, which may be an RFQ accelerator, having a variable heat removal requirement, by circulating a cooling fluid through a cooling system remote from the device. Internal sensors in the device enable an estimated error signal to be generated from parameters which are indicative of the heat removal requirement from the device. Sensors are provided at predetermined locations in the cooling system for outputting operational temperature signals. Analog and digital computers define a control signal functionally related to the temperature signals and the estimated error signal, where the control signal is defined effective to return the device to the preselected operating temperature in a stable manner. The cooling system includes a first heat sink responsive to a first portion of the control signal to remove heat from a major portion of the circulating fluid. A second heat sink is responsive to a second portion of the control signal to remove heat from a minor portion of the circulating fluid. The cooled major and minor portions of the circulating fluid are mixed in response to a mixing portion of the control signal, which is effective to proportion the major and minor portions of the circulating fluid to establish a mixed fluid temperature which is effective to define the preselected operating temperature for the remote device. In an RFQ environment the stable temperature control enables the resonant frequency of the device to be maintained at substantially a predetermined value during transient operations.

Bolie, Victor W. (Albuquerque, NM)

1990-01-01T23:59:59.000Z

198

Electron beam accelerator with magnetic pulse compression and accelerator switching  

DOE Patents (OSTI)

An electron beam accelerator comprising an electron beam generator-injector to produce a focused beam of .gtoreq.0.1 MeV energy electrons; a plurality of substantially identical, aligned accelerator modules to sequentially receive and increase the kinetic energies of the beam electrons by about 0.1-1 MeV per module. Each accelerator module includes a pulse-forming network that delivers a voltage pulse to the module of substantially 0.1-1 MeV maximum energy over a time duration of .ltoreq.1 .mu.sec.

Birx, Daniel L. (Brentwood, CA); Reginato, Louis L. (Orinda, CA)

1987-01-01T23:59:59.000Z

199

Electron beam accelerator with magnetic pulse compression and accelerator switching  

DOE Patents (OSTI)

An electron beam accelerator comprising an electron beam generator-injector to produce a focused beam of .gtoreq.0.1 MeV energy electrons; a plurality of substantially identical, aligned accelerator modules to sequentially receive and increase the kinetic energies of the beam electrons by about 0.1-1 MeV per module. Each accelerator module includes a pulse-forming network that delivers a voltage pulse to the module of substantially .gtoreq.0.1-1 MeV maximum energy over a time duration of .ltoreq.1 .mu.sec.

Birx, Daniel L. (Brentwood, CA); Reginato, Louis L. (Orinda, CA)

1988-01-01T23:59:59.000Z

200

Electron beam accelerator with magnetic pulse compression and accelerator switching  

DOE Patents (OSTI)

An electron beam accelerator is described comprising an electron beam generator-injector to produce a focused beam of greater than or equal to .1 MeV energy electrons; a plurality of substantially identical, aligned accelerator modules to sequentially receive and increase the kinetic energies of the beam electron by about .1-1 MeV per module. Each accelerator module includes a pulse-forming network that delivers a voltage pulse to the module of substantially .1-1 MeV maximum energy over a time duration of less than or equal to 1 ..mu..sec.

Birx, D.L.; Reginato, L.L.

1984-03-22T23:59:59.000Z

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Theoretical Investigations of Plasma-Based Accelerators and Other Advanced Accelerator Concepts  

SciTech Connect

Theoretical investigations of plasma-based accelerators and other advanced accelerator concepts. The focus of the work was on the development of plasma based and structure based accelerating concepts, including laser-plasma, plasma channel, and microwave driven plasma accelerators.

Shuets, G.

2004-05-21T23:59:59.000Z

202

Pulse - Accelerator Science in Medicine  

NLE Websites -- All DOE Office Websites (Extended Search)

t he future of accelerator physics isn’t just for physicists. As in the past, tomorrow’s discoveries in particle accelerator science may lead to unexpected applications for medical diagnosis, healing and the understanding of human biology. t he future of accelerator physics isn’t just for physicists. As in the past, tomorrow’s discoveries in particle accelerator science may lead to unexpected applications for medical diagnosis, healing and the understanding of human biology. Breakthroughs in the technology of superconducting magnets, nanometer beams, laser instrumentation and information technology will give high-energy physicists new accelerators to explore the deepest secrets of the universe: the ultimate structure of matter and the nature of space and time. But breakthroughs in accelerator science may do more than advance the exploration of particles and forces. No field of science is an island. Physics, astronomy, chemistry, biology, medicine— all interact in the continuing human endeavor to explore and understand our world and ourselves. Research at high-energy physics laboratories will lead to the next generation of particle accelerators—and perhaps to new tools for medical science.

203

Site C  

Office of Legacy Management (LM)

' ' u. s. A r my Corps or Engineers Kurfal.. Ilisfr ifl om« 1776 N1 . ~lI rll Sfred , lIu fflll" , New v ur k. 14207 Site C loseout Report for th e Ashland I (Includlng Seaway Arca D), Ashland 2 and Rattlesnake Creek FUS RAP Sites To nawanda . New Yor k F ina l - Octo ber 2006 Formerl y Ut ilized Sites Remedi al Actiun Program Dt:CLAlUlfiO lO OF RF ~ I'O""" A <:n o .. ('oMnLflOI'O '" 1 S-~1 1 A "n· nvnn: S Ill: C'lO'iU 'U l RtrUlIT f OR A SlIu x u l (I "ICLU I ING S t:A" ·,H A RU D j, AS H I .A ~O 2 A."n RAnU:M'AKf eRU" ~ rn~ I!d'on at A.hland 1 (Ind udonl Seaway Area DJ. Ashland 2 and kan~snak c Creek is Wi,...... 1c in acwr.hnu willi ~ Rcconl or Oecisim (ROD) . igned 00> April 20. 1998 and l'.1pbIWlOII <;If

204

The Scanning Electron Microscope As An Accelerator For The Undergraduate Advanced Physics Laboratory  

Science Conference Proceedings (OSTI)

Few universities or colleges have an accelerator for use with advanced physics laboratories, but many of these institutions have a scanning electron microscope (SEM) on site, often in the biology department. As an accelerator for the undergraduate, advanced physics laboratory, the SEM is an excellent substitute for an ion accelerator. Although there are no nuclear physics experiments that can be performed with a typical 30 kV SEM, there is an opportunity for experimental work on accelerator physics, atomic physics, electron-solid interactions, and the basics of modern e-beam lithography.

Peterson, Randolph S. [Department of Physics and Astronomy, University of the South, 735 University Avenue, Sewanee TN 37383 (United States); Department of Electrical Engineering and Computer Science, Massachusetts Institute of Technology, 50 Vassar Street, Cambridge MA 01239 (United States); Berggren, Karl K.; Mondol, Mark [Department of Electrical Engineering and Computer Science, Massachusetts Institute of Technology, 50 Vassar Street, Cambridge MA 01239 (United States)

2011-06-01T23:59:59.000Z

205

SNEAP 80: symposium of Northeastern Accelerator personnel  

SciTech Connect

Reports of operations are presented for twenty-seven facilities, along with reports on accelerators in progress, ion sources, insulating gases, charging systems, stripping foils, accelerating tubes, and upgraded accelerator systems. (GHT)

Billen, J.H. (ed.) ed.

1980-01-01T23:59:59.000Z

206

Laser Wakefield Particle Accelerators Project at NERSC  

NLE Websites -- All DOE Office Websites (Extended Search)

Particle Acceleration Laser Wakefield Particle Acceleration Vorpal.jpg Key Challenges: Design of multiple-staged, 10-GeV laser-wakefield plasma accelerated next-generation hardware...

207

Fermi National Accelerator Laboratory April 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

into applications for the nation's health, wealth and security. Science at Fermilab Illinois Accelerator Research Center The Illinois Accelerator Research Center, or IARC, will...

208

Science Accelerator content now includes multimedia  

Office of Scientific and Technical Information (OSTI)

Science Accelerator content now includes multimedia Science Accelerator has expanded its suite of collections to include ScienceCinema, which contains videos produced by the U.S....

209

Honda Insight Fleet and Accelerated Reliability Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Ford Fusion Hybrid Electric Vehicle Accelerated Testing - May 2012 Two model year 2010 Ford Fusion hybrid electric vehicles (HEVs) entered Accelerated testing during August 2009 in...

210

Honda Insight Fleet and Accelerated Reliability Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Mazda 3 Micro Hybrid Vehicle Accelerated Testing - December 2012 Two Mazda 3 European Micro Hybrid Vehicles (MHVs) entered accelerated testing during November 2010 in a fleet in...

211

Honda Insight Fleet and Accelerated Reliability Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Volkswagen Golf Micro Hybrid Vehicle Accelerated Testing - December 2012 Two Volkswagen Golf European Micro Hybrid Vehicle (MHVs) entered accelerated testing during October 2010 in...

212

Honda Insight Fleet and Accelerated Reliability Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Hybrid Electric Vehicle Accelerated Testing (Model Year 2004) - October 2007 Two (Model Year 2004) Toyota Prius hybrid electric vehicles (HEVs) entered accelerated testing in a...

213

Honda Insight Fleet and Accelerated Reliability Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Smart fortwo Micro Hybrid Vehicle Accelerated Testing - December 2012 Three Smart fortwo European Micro Hybrid Vehicles (MHVs) entered accelerated testing during October 2010 in a...

214

Technology Commercialization and Partnerships | CASE Accelerates ...  

The Center for Accelerator Science and ... get hands-on experience using the accelerator and reporting their results. ... R&D funding is especially important for ...

215

Honda Insight Fleet and Accelerated Reliability Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Gen III Prius HEV Accelerated Testing - May 2012 Two model year 2010 Toyota Generation III Prius hybrid electric vehicles (HEVs) entered Accelerated testing during July 2009 in a...

216

Argonne Wakefield Accelerator Facility (AWA) Upgrades  

NLE Websites -- All DOE Office Websites (Extended Search)

Facility is dedicated to the study of advanced accelerator concepts based on electron beam driven wakefield acceleration and RF power generation. The facility employs an...

217

Honda Insight Fleet and Accelerated Reliability Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Gen II Insight HEV Accelerated Testing - August 2012 Two model year 2010 Honda Generation II Insight hybrid electric vehicles (HEVs) entered Accelerated testing during July 2009 in...

218

SLAC National Accelerator Laboratory - SLAC's Newest Facility...  

NLE Websites -- All DOE Office Websites (Extended Search)

the Max Planck Institute of Physics in Berlin will continue their efforts to make accelerators smaller and more efficient using a technique called plasma wakefield acceleration....

219

A Tunable Dielectric Wakefield Accelerating Structure  

NLE Websites -- All DOE Office Websites (Extended Search)

a (11-13) GHz dielectric accelerating structure. INTRODUCTION The field of advanced accelerators is in search of novel revolutionary technologies to allow progress in particle...

220

SLAC National Accelerator Laboratory - Scientific Programs  

NLE Websites -- All DOE Office Websites (Extended Search)

Programs Advanced Accelerator Research Particle accelerators are complicated machines, with hundreds of thousands of components that all need to be designed, engineered and...

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Annual Planning Summaries: Stanford Linear Accelerator (SLAC...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Stanford Linear Accelerator (SLAC) Annual Planning Summaries: Stanford Linear Accelerator (SLAC) Document(s) Available For Download January 11, 2012 2012 Annual Planning Summary...

222

Argonne National Laboratory's Accelerator Experimental Infrastructure  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerator Experimental Infrastructure Argonne National Laboratory is somewhat unique among the Office of Science National Laboratories in that it possesses active accelerator...

223

Terahertz radiation from laser accelerated electron bunches  

E-Print Network (OSTI)

NUMBER 5 MAY 2004 Terahertz radiation from laser acceleratedand millimeter wave radiation from laser acceleratedNo. 5, May 2004 Terahertz radiation from laser accelerated

2004-01-01T23:59:59.000Z

224

Early Days of Accelerator Mass Spectrometry  

DOE R&D Accomplishments (OSTI)

Alvarez reviews his role in the development of the tandem Van de Graaff accelerator and the technique of accelerator mass spectrometry as a technique for isotope dating. (GHT)

Alvarez, L. W.

1981-05-00T23:59:59.000Z

225

Honda Insight Fleet and Accelerated Reliability Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Civic CNG Accelerated Testing - June 2013 Four model year 2013 Honda Civic compressed natural gas (CNGs) entered Accelerated testing during November 2012 in a fleet in Arizona....

226

Honda Insight Fleet and Accelerated Reliability Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Volt EREV Accelerated Testing - June 2013 Four model year 2013 Chevrolet Volt extended range electric vehicles (EREVs) entered Accelerated testing during November 2012 in a fleet...

227

Honda Insight Fleet and Accelerated Reliability Testing  

NLE Websites -- All DOE Office Websites (Extended Search)

Chevrolet Volt EREV Accelerated Testing - June 2013 Two model year 2011 Chevrolet Volt extended range electric vehicles (EREVs) entered Accelerated testing during March 2011 in a...

228

CRAD, Radiological Controls - Idaho Accelerated Retrieval Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Radiological Controls - Idaho Accelerated Retrieval Project Phase II CRAD, Radiological Controls - Idaho Accelerated Retrieval Project Phase II February 2006 A section of Appendix...

229

CRAD, Emergency Management - Idaho Accelerated Retrieval Project...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Emergency Management - Idaho Accelerated Retrieval Project Phase II CRAD, Emergency Management - Idaho Accelerated Retrieval Project Phase II February 2006 A section of Appendix C...

230

BNL | Accelerators for Applied Research  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerators for Applied Research Accelerators for Applied Research Brookhaven National Lab operates several accelerator facilities dedicated to applied research. These facilities directly address questions and concerns on a tremendous range of fields, including medical imaging, cancer therapy, computation, and space exploration. Leading scientists lend their expertise to these accelerators and offer crucial assistant to collaborating researchers, pushing the limits of science and technology. Interested in gaining access to these facilities for research? See the contact number listed for each facility. RHIC tunnel Brookhaven Linac Isotope Producer The Brookhaven Linac Isoptope Producer (BLIP)-positioned at the forefront of research into radioisotopes used in cancer treatment and diagnosis-produces commercially unavailable radioisotopes for use by the

231

IMPACT-T: Accelerator Physics  

NLE Websites -- All DOE Office Websites (Extended Search)

IMPACTT General Description IMPACT-T (Integrated Map and Particle Accelerator Tracking-Time) is a parallel, three-dimensional, quasi-static beam dynamics code used to study...

232

Accelerating and rotating black holes  

E-Print Network (OSTI)

An exact solution of Einstein's equations which represents a pair of accelerating and rotating black holes (a generalised form of the spinning C-metric) is presented. The starting point is a form of the Plebanski-Demianski metric which, in addition to the usual parameters, explicitly includes parameters which describe the acceleration and angular velocity of the sources. This is transformed to a form which explicitly contains the known special cases for either rotating or accelerating black holes. Electromagnetic charges and a NUT parameter are included, the relation between the NUT parameter $l$ and the Plebanski-Demianski parameter $n$ is given, and the physical meaning of all parameters is clarified. The possibility of finding an accelerating NUT solution is also discussed.

J. B. Griffiths; J. Podolsky

2005-07-06T23:59:59.000Z

233

Residual Activation of Accelerator Components  

Science Conference Proceedings (OSTI)

Accelerators / Special Issue on the 11th International Conference on Radiation Shielding and the 15th Topical Meeting of the Radiation Protection and Shielding Division (PART 3) / Radiation Measurements and Instrumentation

I. L. Rakhno; N. V. Mokhov; S. I. Striganov

234

APS Accelerator Systems Division Home  

NLE Websites -- All DOE Office Websites (Extended Search)

Photon Source and pursues research and development profitable to the science of accelerators and future light source technologies. Featured Image Two 352-MHz1-kW CW solid...

235

What is SLAC National Accelerator  

NLE Websites -- All DOE Office Websites (Extended Search)

SLAC National Accelerator Laboratory? The numbers tell the tale. SLAC began in 1962 with 200 employees. Nearly 1,700 people now work on staff plus 300 postdoctoral researchers and...

236

Electrodynamics acceleration of electrical dipoles  

E-Print Network (OSTI)

This article considers the acceleration of electric dipoles consisting of thin metal plates and dielectric (barium titanate). The dipoles are of a cylindrical shape with a diameter of the cylinder two centimeters and length one centimeter. Capacity of the parallel-plate capacitor is three hundred picofarads and it is charged up to the voltage of two hundred eighty kilovolts. Pre-acceleration of the electric dipoles till velocity one kilometer per second is reached by the gas-dynamic method. The finite acceleration is produced in a spiral waveguide, where the pulse is travelling with voltage amplitude seven hundreds kilovolts and power one hundred twenty-five megawatts. This pulse travels via the spiral waveguide and accelerates the injected electric dipoles in the longitudinal direction till the finite velocity eight and a half kilometers per second over length seven hundred and seventy meters.

Dolya, S N

2013-01-01T23:59:59.000Z

237

Science Accelerator | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Dataset Summary Description Science Accelerator is a gateway to science, including DOE R&D results, major R&D accomplishments, and recent research of interest to U.S. Department...

238

High-Intensity Proton Accelerator  

SciTech Connect

Analysis is presented for an eight-cavity proton cyclotron accelerator that could have advantages as compared with other accelerators because of its potentially high acceleration gradient. The high gradient is possible since protons orbit in a sequence of TE111 rotating mode cavities of equally diminishing frequencies with path lengths during acceleration that greatly exceed the cavity lengths. As the cavities operate at sequential harmonics of a basic repetition frequency, phase synchronism can be maintained over a relatively wide injection phase window without undue beam emittance growth. It is shown that use of radial vanes can allow cavity designs with significantly smaller radii, as compared with simple cylindrical cavities. Preliminary beam transport studies show that acceptable extraction and focusing of a proton beam after cyclic motion in this accelerator should be possible. Progress is also reported on design and tests of a four-cavity electron counterpart accelerator for experiments to study effects on beam quality arising from variations injection phase window width. This device is powered by four 500-MW pulsed amplifiers at 1500, 1800, 2100, and 2400 MHz that provide phase synchronous outputs, since they are driven from a with harmonics derived from a phase-locked 300 MHz source.

Jay L. Hirshfield

2011-12-27T23:59:59.000Z

239

SRS Recovery Act Program Reaches $1 Billion Mark: Investments Accelerate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act Program Reaches $1 Billion Mark: Investments Recovery Act Program Reaches $1 Billion Mark: Investments Accelerate Cleanup; Support Jobs, Training and Local Economy SRS Recovery Act Program Reaches $1 Billion Mark: Investments Accelerate Cleanup; Support Jobs, Training and Local Economy March 2, 2011 - 12:00pm Addthis Media Contacts Jim Giusti, DOE (803) 952-7697 james-r.giusti@srs.gov Paivi Nettamo, SRNS (803) 292-2484 paivi.nettamo@srs.gov John Lindsay, SRR (803) 208-6253 john02lindsay@srs.gov AIKEN, S.C. - In 22 short months, the Savannah River Site (SRS) has spent $1 billion in American Recovery and Reinvestment Act funds to accelerate environmental cleanup of the remaining Cold War legacy, while supporting jobs, training and small businesses in our region. This funding milestone has resulted in 122 square miles of actual footprint reduction at SRS,

240

SRS Recovery Act Program Reaches $1 Billion Mark: Investments Accelerate  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRS Recovery Act Program Reaches $1 Billion Mark: Investments SRS Recovery Act Program Reaches $1 Billion Mark: Investments Accelerate Cleanup; Support Jobs, Training and Local Economy SRS Recovery Act Program Reaches $1 Billion Mark: Investments Accelerate Cleanup; Support Jobs, Training and Local Economy March 2, 2011 - 12:00pm Addthis Media Contacts Jim Giusti, DOE (803) 952-7697 james-r.giusti@srs.gov Paivi Nettamo, SRNS (803) 292-2484 paivi.nettamo@srs.gov John Lindsay, SRR (803) 208-6253 john02lindsay@srs.gov AIKEN, S.C. - In 22 short months, the Savannah River Site (SRS) has spent $1 billion in American Recovery and Reinvestment Act funds to accelerate environmental cleanup of the remaining Cold War legacy, while supporting jobs, training and small businesses in our region. This funding milestone has resulted in 122 square miles of actual footprint reduction at SRS,

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

The CEBAF cryogenic system: Continuous Electron Beam Accelerator Facility  

SciTech Connect

The CEBAF superconducting linear accelerator incorporates cryogenic refrigeration equipment at three locations within the site: the Central Helium Liquefier, located in the center of the accelerator; the experimental end station refrigerator; and the test laboratory refrigerator located in the Cryogenic Test Facility (CTF) adjacent to the test laboratory. The CEBAF cryogenic system will provide 2K refrigeration to the linacs of the accelerator and test laboratory and 4.5K refrigeration for the end station experimental halls. The Central Helium Liquefier and the test laboratory systems will produce 45K supercritical gaseous helium for shield refrigeration. Liquid nitrogen shields will also be incorporated in the test laboratory and end stations. 6 refs., 5 figs.

Chronis, W.C.; Arenius, D.; Kashy, D.; Keesee, M.; Rode, C.H.

1989-01-01T23:59:59.000Z

242

Accelerator and electrodynamics capability review  

Science Conference Proceedings (OSTI)

Los Alamos National Laboratory (LANL) uses capability reviews to assess the science, technology and engineering (STE) quality and institutional integration and to advise Laboratory Management on the current and future health of the STE. Capability reviews address the STE integration that LANL uses to meet mission requirements. The Capability Review Committees serve a dual role of providing assessment of the Laboratory's technical contributions and integration towards its missions and providing advice to Laboratory Management. The assessments and advice are documented in reports prepared by the Capability Review Committees that are delivered to the Director and to the Principal Associate Director for Science, Technology and Engineering (PADSTE). Laboratory Management will use this report for STE assessment and planning. LANL has defined fifteen STE capabilities. Electrodynamics and Accelerators is one of the seven STE capabilities that LANL Management (Director, PADSTE, technical Associate Directors) has identified for review in Fiscal Year (FY) 2010. Accelerators and electrodynamics at LANL comprise a blend of large-scale facilities and innovative small-scale research with a growing focus on national security applications. This review is organized into five topical areas: (1) Free Electron Lasers; (2) Linear Accelerator Science and Technology; (3) Advanced Electromagnetics; (4) Next Generation Accelerator Concepts; and (5) National Security Accelerator Applications. The focus is on innovative technology with an emphasis on applications relevant to Laboratory mission. The role of Laboratory Directed Research and Development (LDRD) in support of accelerators/electrodynamics will be discussed. The review provides an opportunity for interaction with early career staff. Program sponsors and customers will provide their input on the value of the accelerator and electrodynamics capability to the Laboratory mission.

Jones, Kevin W [Los Alamos National Laboratory

2010-01-01T23:59:59.000Z

243

Fermi National Accelerator Laboratory September 2012  

NLE Websites -- All DOE Office Websites (Extended Search)

2 2 Tritium, which has a half-life of 12.3 years, is an expected byproduct of accelerator operations at Fermilab. As part of our environmental monitoring program, we regularly sample the water discharged into the creeks on site and report the results to the Illinois Environmental Protection Agency, as required by state regulations. We also regularly test the water in the sanitary sewers. The low levels of tritium found since 2005 in Indian Creek, some Fermilab ponds and the sanitary sewers are far lower than the standards Fermilab is required to meet. They pose no threat to human health or the environment. Fermilab is committed to go beyond merely satisfying the regulatory standards. We strive to keep the tritium discharges as low as reasonably achievable, keep the public fully informed, and engage

244

The Advanced Manufacturing Jobs and Innovation Accelerator ...  

Science Conference Proceedings (OSTI)

Page 1. Advanced Manufacturing Jobs and Innovation Accelerator Challenge – Application Guide & Document Checklist 1 of 4 ...

2012-06-26T23:59:59.000Z

245

Interconnection Network for Tightly Coupled Accelerators Architecture  

Science Conference Proceedings (OSTI)

In recent years, heterogeneous clusters using accelerators have entered widespread use in high-performance computing systems. In such clusters, inter-node communication between accelerators normally requires several memory copies via CPU memory, which ... Keywords: PCI Express, Interconnect for accelerators, GPU cluster, Accelerator computing, Remote DMA

Toshihiro Hanawa, Yuetsu Kodama, Taisuke Boku, Mitsuhisa Sato

2013-08-01T23:59:59.000Z

246

Pulse - Accelerator Science in Medicine  

NLE Websites -- All DOE Office Websites (Extended Search)

t the forefront of biomedical research, medical scientists use particle accelerators to explore the structure of biological molecules. They use the energy that charged particles emit when accelerated to nearly the speed of light to create one of the brightest lights on earth, 30 times more powerful than the sun and focused on a pinpoint. t the forefront of biomedical research, medical scientists use particle accelerators to explore the structure of biological molecules. They use the energy that charged particles emit when accelerated to nearly the speed of light to create one of the brightest lights on earth, 30 times more powerful than the sun and focused on a pinpoint. Deciphering the structure of proteins is key to understanding biological processes and healing disease. To determine a proteinÂ’s structure, researchers direct the beam from an accelerator called a synchrotron through a protein crystal. The crystal scatters the beam onto a detector. From the pattern of scattering, computers calculate the position of every atom in the protein molecule and create a 3-D image of the molecule.

247

(Stanford Linear Accelerator Center) annual environmental monitoring report, January--December 1989  

SciTech Connect

This progress report discusses environmental monitoring activities at the Stanford Linear Accelerator Center for 1989. Topics include climate, site geology, site water usage, land use, demography, unusual events or releases, radioactive and nonradioactive releases, compliance summary, environmental nonradiological program information, environmental radiological program information, groundwater protection monitoring ad quality assurance. 5 figs., 7 tabs. (KJD)

Not Available

1990-05-01T23:59:59.000Z

248

Exceptional Ground Accelerations and Velocities Caused by Earthquakes  

Science Conference Proceedings (OSTI)

This project aims to understand the characteristics of the free-field strong-motion records that have yielded the 100 largest peak accelerations and the 100 largest peak velocities recorded to date. The peak is defined as the maximum magnitude of the acceleration or velocity vector during the strong shaking. This compilation includes 35 records with peak acceleration greater than gravity, and 41 records with peak velocities greater than 100 cm/s. The results represent an estimated 150,000 instrument-years of strong-motion recordings. The mean horizontal acceleration or velocity, as used for the NGA ground motion models, is typically 0.76 times the magnitude of this vector peak. Accelerations in the top 100 come from earthquakes as small as magnitude 5, while velocities in the top 100 all come from earthquakes with magnitude 6 or larger. Records are dominated by crustal earthquakes with thrust, oblique-thrust, or strike-slip mechanisms. Normal faulting mechanisms in crustal earthquakes constitute under 5% of the records in the databases searched, and an even smaller percentage of the exceptional records. All NEHRP site categories have contributed exceptional records, in proportions similar to the extent that they are represented in the larger database.

Anderson, John

2008-01-17T23:59:59.000Z

249

Division Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Carbon Dioxide Reduction Catalysts Carbon Dioxide Reduction Catalysts Our research program is directed toward developing and understanding metal complexes that catalyze reactions relevant to renewable energy, particularly those that reduce carbon dioxide to fuels or fuel precursors. Carbon dioxide reduction catalysts are important targets because they could enable "recycling" of hydrocarbon fuels, thus lowering their carbon footprint. Our research addresses two key challenges in this area. First, we aim to improve the lifetimes, activity, and selectivity of homogeneous catalysts by incorporating them into porous heterogeneous frameworks derived from structurally persistent organic polymers. These frameworks allow isolation of the catalytic centers, which inhibits reaction pathways that lead to catalyst decomposition, and enable the spatially controlled deployment of ancillary functional groups that bind and concentrate substrate near the active site and/or assist with its activation. Second, we are developing homogeneous dual-catalyst systems and assemblies that couple CO2 reduction catalysis to a parallel catalytic reaction that provides the reducing equivalents. We are especially interested in proton-coupled electron-transfer reactions involving activation of H2 and of organic dehydrogenation substrates, wherein the proton pathway also participates in the conversion of CO2 to CO. In both of these research thrusts we are studying catalysts that may be activated under thermal, electrochemical, or photochemical conditions.

250

Market Acceleration | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Market Acceleration Market Acceleration Market Acceleration Photo of the Wanapum Dam. Hydropower contributes significantly to the nation's renewable energy portfolio; over the last decade, the United States obtained nearly 7% of its electricity from hydropower sources. Already the largest source of renewable electricity in the United States, there remains a vast untapped resource potential in hydropower. To achieve its vision of supporting 15% of our nation's electricity needs from water power by 2030, the Water Power Program works to address environmental and regulatory barriers that prevent significant amounts of deployment; to assess and quantify the value of hydropower to the nation's electric grid and its ability to integrate other variable renewable energy technologies; and to develop a vibrant U.S.

251

Accelerated Aging of Roofing Surfaces  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerated aging of roofing surfaces Accelerated aging of roofing surfaces Hugo Destaillats, Ph.D. Lawrence Berkeley National Laboratory HDestaillats@LBL.gov (510) 486-5897 http://HeatIsland.LBL.gov April 4, 2013 Development of Advanced Building Envelope Surface Materials & Integration of Artificial Soiling and Weathering in a Commercial Weatherometer New York Times, 30 July 2009 2010 2012 Challenge: speed the development of high performance building envelope materials that resist soiling, maintain high solar reflectance, and save energy 2 | Building Technologies Office eere.energy.gov

252

Accelerator Operators and Software Development  

SciTech Connect

At Thomas Jefferson National Accelerator Facility, accelerator operators perform tasks in their areas of specialization in addition to their machine operations duties. One crucial area in which operators contribute is software development. Operators with programming skills are uniquely qualified to develop certain controls applications because of their expertise in the day-to-day operation of the accelerator. Jefferson Lab is one of the few laboratories that utilizes the skills and knowledge of operators to create software that enhances machine operations. Through the programs written; by operators, Jefferson Lab has improved machine efficiency and beam availability. Because many of these applications involve automation of procedures and need graphical user interfaces, the scripting language Tcl and the Tk toolkit have been adopted. In addition to automation, some operator-developed applications are used for information distribution. For this purpose, several standard web development tools such as perl, VBScript, and ASP are used. Examples of applications written by operators include injector steering, spin angle changes, system status reports, magnet cycling routines, and quantum efficiency measurements. This paper summarizes how the unique knowledge of accelerator operators has contributed to the success of the Jefferson Lab control system. *This work was supported by the U.S. DOE contract No. DE-AC05-84-ER40150.

April Miller; Michele Joyce

2001-11-01T23:59:59.000Z

253

Thomas Jefferson National Accelerator Facility  

Science Conference Proceedings (OSTI)

The Thomas Jefferson National Accelerator Facility (Jefferson Lab) in Newport News, Virginia, USA, is one of ten national laboratories under the aegis of the Office of Science of the U.S. Department of Energy (DOE). It is managed and operated by Jefferson Science Associates, LLC. The primary facility at Jefferson Lab is the Continuous Electron Beam Accelerator Facility (CEBAF) as shown in an aerial photograph in Figure 1. Jefferson Lab was created in 1984 as CEBAF and started operations for physics in 1995. The accelerator uses superconducting radio-frequency (srf) techniques to generate high-quality beams of electrons with high-intensity, well-controlled polarization. The technology has enabled ancillary facilities to be created. The CEBAF facility is used by an international user community of more than 1200 physicists for a program of exploration and study of nuclear, hadronic matter, the strong interaction and quantum chromodynamics. Additionally, the exceptional quality of the beams facilitates studies of the fundamental symmetries of nature, which complement those of atomic physics on the one hand and of high-energy particle physics on the other. The facility is in the midst of a project to double the energy of the facility and to enhance and expand its experimental facilities. Studies are also pursued with a Free-Electron Laser produced by an energy-recovering linear accelerator.

Joseph Grames, Douglas Higinbotham, Hugh Montgomery

2010-09-01T23:59:59.000Z

254

Accelerators for Intensity Frontier Research  

SciTech Connect

In 2008, the Particle Physics Project Prioritization Panel identified three frontiers for research in high energy physics, the Energy Frontier, the Intensity Frontier, and the Cosmic Frontier. In this paper, I will describe how Fermilab is configuring and upgrading the accelerator complex, prior to the development of Project X, in support of the Intensity Frontier.

Derwent, Paul; /Fermilab

2012-05-11T23:59:59.000Z

255

GPU-accelerated path rendering  

Science Conference Proceedings (OSTI)

For thirty years, resolution-independent 2D standards (e.g. PostScript, SVG) have depended on CPU-based algorithms for the filling and stroking of paths. Advances in graphics hardware have largely ignored accelerating resolution-independent 2D graphics ... Keywords: OpenGL, path rendering, stencil buffer, vector graphics

Mark J. Kilgard; Jeff Bolz

2012-11-01T23:59:59.000Z

256

Accelerating lattice reduction with FPGAs  

Science Conference Proceedings (OSTI)

We describe an FPGA accelerator for the Kannan-Fincke-Pohst enumeration algorithm (KFP) solving the Shortest Lattice Vector Problem (SVP). This is the first FPGA implementation of KFP specifically targeting cryptographically relevant dimensions. In order ... Keywords: FPGA, euclidean lattices, shortest vector problem

Jérémie Detrey; Guillaume Hanrot; Xavier Pujol; Damien Stehlé

2010-08-01T23:59:59.000Z

257

Petawatt pulsed-power accelerator  

DOE Patents (OSTI)

A petawatt pulsed-power accelerator can be driven by various types of electrical-pulse generators, including conventional Marx generators and linear-transformer drivers. The pulsed-power accelerator can be configured to drive an electrical load from one- or two-sides. Various types of loads can be driven; for example, the accelerator can be used to drive a high-current z-pinch load. When driven by slow-pulse generators (e.g., conventional Marx generators), the accelerator comprises an oil section comprising at least one pulse-generator level having a plurality of pulse generators; a water section comprising a pulse-forming circuit for each pulse generator and a level of monolithic triplate radial-transmission-line impedance transformers, that have variable impedance profiles, for each pulse-generator level; and a vacuum section comprising triplate magnetically insulated transmission lines that feed an electrical load. When driven by LTD generators or other fast-pulse generators, the need for the pulse-forming circuits in the water section can be eliminated.

Stygar, William A. (Albuquerque, NM); Cuneo, Michael E. (Albuquerque, NM); Headley, Daniel I. (Albuquerque, NM); Ives, Harry C. (Albuquerque, NM); Ives, legal representative; Berry Cottrell (Albuquerque, NM); Leeper, Ramon J. (Albuquerque, NM); Mazarakis, Michael G. (Albuquerque, NM); Olson, Craig L. (Albuquerque, NM); Porter, John L. (Sandia Park, NM); Wagoner; Tim C. (Albuquerque, NM)

2010-03-16T23:59:59.000Z

258

The BErkeley Lab Laser Accelerator (BELLA): A 10 GeV Laser Plasma Accelerator  

E-Print Network (OSTI)

The BErkeley Lab Laser Accelerator (BELLA):A 10 GeV Laser Plasma Accelerator W.P. Leemans ' , R.of the design of a 10 GeV laser plasma accelerator (LPA)

Leemans, W.P.

2011-01-01T23:59:59.000Z

259

CERCLA - Site Selector  

NLE Websites -- All DOE Office Websites (Extended Search)

(LEHR) Fernald Preserve Monticello Site Mound Site - Miamisburg Closure Project Rocky Flats Site Weldon Spring Search the Administrative Record The White House USA.gov E-Gov...

260

ORNL DAAC Site Map  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map ORNL DAAC Site Map About Us About ORNL DAAC Who We Are User Working Group Biogeochemical Dynamics Data Citation Policy News Newsletters Workshops Site Map Products...

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Savannah River Site  

NLE Websites -- All DOE Office Websites (Extended Search)

River Site Savannah River Site Savannah River Site (SRS) has mission responsibilities in nuclear weapons stockpile stewardship by ensuring the safe and reliable management of...

262

CERCLA - Site Selector  

Office of Legacy Management (LM)

Monticello Site Mound Site - Miamisburg Closure Project Rocky Flats Site Weldon Spring Search the Administrative Record The White House USA.gov E-Gov Information Quality FOIA...

263

SSA Young Aspen Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Site (SSA-YA) The pole-tower at the YA site Closer look at the pole-tower at the YA site Solar panels powering the site, mounted on a folding ladder The young aspen canopy...

264

Chapter 3: Building Siting  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: Building Siting : Building Siting Site Issues at LANL Site Inventory and Analysis Site Design Transportation and Parking LANL | Chapter 3 Site Issues at LANL Definitions and related documents Building Siting Laboratory site-wide issues include transportation and travel distances for building occupants, impacts on wildlife corridors and hydrology, and energy supply and distribution limitations. Decisions made during site selec- tion and planning impact the surrounding natural habitat, architectural design integration, building energy con- sumption, occupant comfort, and occupant productivity. Significant opportunities for creating greener facilities arise during the site selection and site planning stages of design. Because LANL development zones are pre- determined, identify the various factors affecting devel-

265

Indiana Web Sites  

U.S. Energy Information Administration (EIA)

Indiana Web Sites Other Links : Indiana Electricity Profile: Indiana Energy Profile: Indiana Restructuring: Last Updated: April 2007 . Sites: Links ...

266

Florida Web Sites  

U.S. Energy Information Administration (EIA)

Florida Web Sites Other Links : Florida Electricity Profile: Florida Energy Profile: Florida Restructuring: Last Updated: April 2007 . Sites: Links ...

267

MIDC: Web Site Search  

NLE Websites -- All DOE Office Websites (Extended Search)

MIDC Web Site Search Enter words or phrases: Search Clear Help Also see the site directory. NREL MIDC...

268

ACCP web site  

NLE Websites -- All DOE Office Websites (Extended Search)

ACCP Datasets Available ACCP - The Accelerated Canopy Chemistry Program (ACCP) was an investigation to determine the theoretical and empirical basis for remote sensing of nitrogen...

269

ESnet Site List  

NLE Websites -- All DOE Office Websites (Extended Search)

CA) JLAB Thomas Jefferson National Accelerator Facility (Newport News, VA) KCP Kansas City Plant (Kansas City, MO) KCP-ALBQ Kansas City Plant (Albuquerque, NM) LANL Los Alamos...

270

Survey of Advanced Dielectric Wakefield Accelerators  

NLE Websites -- All DOE Office Websites (Extended Search)

out wakefield accelerator research. Wakefield Acceleration at AATF The AATF had an electron beam produced by an L- band thermionic RF gun followed by two traveling-wave linac...

271

Science Accelerator Widget | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Science Accelerator Widget BusinessUSA DataTools Apps Challenges Let's Talk BusinessUSA You are here Data.gov Communities BusinessUSA Data Science Accelerator Widget...

272

Research Accelerator Division | Neutron Science | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Kevin Jones The Research Accelerator Division is responsible for operation of the SNS accelerator complex, which consists of a negative hydrogen-ion injector, a 1 GeV linear...

273

Research Accelerator Division | ORNL Neutron Sciences  

NLE Websites -- All DOE Office Websites (Extended Search)

Kevin Jones. The Research Accelerator Division (RAD) is responsible for operation of the SNS accelerator complex, which consists of a negative hydrogen-ion injector, a 1 GeV linear...

274

Elucidating mechanisms of accelerated neurological aging  

E-Print Network (OSTI)

C. (2005). Mechanisms of aging in senescence- accelerated2.2 Strain-specific aging gene-expression profiles…………………..C. (2005). Mechanisms of aging in senescence-accelerated

Greenhall, Jennifer Anne

2008-01-01T23:59:59.000Z

275

Fermilab's Accelerator and Research Divisions  

NLE Websites -- All DOE Office Websites (Extended Search)

July 19, 1996 July 19, 1996 Number 14 Fixed-target experimenters not only expect Fermilab's Accelerator and Research Divisions to turn water into wine-they need 10 different vintages. Providing beam to fixed-target experiments presents the challenge of converting high-inten- sity protons into 10 separate beams of varying intensities and particles, from kaons to neu- trinos. The Accelerator Division generates and splits the beam, and then hands the protons off to the Research Division, which converts them into beams of different particles. The process begins with a breath of hydrogen gas. Eventually the hydrogen atoms lose their outer electrons and become a stream of protons-the formation of the beam. Physicists measure two characteristics of the beam: its energy (eV) and its intensity. Intensity

276

Radiological Training for Accelerator Facilities  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

8-2002 8-2002 May 2002 Change Notice No 1. with Reaffirmation January 2007 DOE HANDBOOK RADIOLOGICAL TRAINING FOR ACCELERATOR FACILITIES U.S. Department of Energy AREA TRNG Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. TS This document has been reproduced from the best available copy. Available to DOE and DOE contractors from ES&H Technical Information Services, U.S. Department of Energy, (800) 473-4375, fax: (301) 903-9823. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. Change Notice 1. Radiological Safety Training for Accelerator Facilities

277

Standards Acceleration to Jumpstart Adoption of Cloud ...  

Science Conference Proceedings (OSTI)

... Standards Acceleration to Jumpstart Adoption of Cloud Computing (SAJACC). The goal of the SAJACC initiative is to drive ...

2013-07-02T23:59:59.000Z

278

Available Technologies: Acceleration of Carbon Dioxide ...  

APPLICATIONS OF TECHNOLOGY: Carbon dioxide capture and sequestration; ADVANTAGES: Accelerated capture of carbon dioxide; Effective at extremely dilute (nanomolar ...

279

Fermi National Accelerator Laboratory Technology Marketing ...  

Fermi National Accelerator Laboratory Technology Marketing Summaries. Here you’ll find marketing summaries for technologies available for licensing ...

280

Accelerating Innovation Webinar Series - Energy Innovation ...  

Accelerating Innovation Webinar Series. In partnership with the Battelle Commercialization Council, the Energy Innovation Portal is hosting an ...

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

SLAC National Accelerator Laboratory Technology Marketing ...  

Energy Analysis; Energy Storage; Geothermal; Hydrogen and Fuel Cell; Hydropower, Wave and Tidal; ... SLAC National Accelerator Laboratory Technology Marketing Summaries.

282

Accelerator Mass Spectrometry: Extreme Sensitivity in Biological ...  

THE LLNL TECHNOLOGY COMPANY PRODUCT 24 Partnering Today: Technology Transfer Highlights Accelerator Mass Spectrometry: Extreme Sensitivity in Biological Research

283

Fermi National Accelerator Laboratory Technologies Available ...  

... Energy Innovation Portal on Google; Bookmark Fermi National Accelerator Laboratory Technologies Available for Licensing - Energy Innovation Portal ...

284

Accelerated Weathering of Fluidized Bed Steam Reformation ...  

Science Conference Proceedings (OSTI)

Sep 16, 2007 ... Accelerated Weathering of Fluidized Bed Steam Reformation Material Under Hydraulically Unsaturated Conditions by E.M. Pierce ...

285

SLAC National Accelerator Laboratory Technology Marketing ...  

Energy Analysis; Energy Storage; Geothermal; Hydrogen and Fuel Cell; Hydropower, Wave and Tidal; ... SLAC National Accelerator Laboratory Technology M ...

286

Accelerated Materials Evaluation for Nuclear Application Utilizing ...  

Science Conference Proceedings (OSTI)

Jul 15, 2013... of accelerated nuclear materials testing for fission and fusion reactors. Presentations combining experiment with theory, modeling and ...

287

Powering Up America: Accelerating an Interoperable Smart ...  

Science Conference Proceedings (OSTI)

Powering Up America: Accelerating an Interoperable Smart Grid (+18 FTE, +$5,000,000). image: Shutterstock, copyright Photoroller. Challenge. ...

2010-10-05T23:59:59.000Z

288

Accelerating Observers, Area and Entropy  

E-Print Network (OSTI)

We consider an explicit example of a process, where the entropy carried by radiation through an accelerating two-plane is proportional to the decrease in the area of that two-plane even when the two-plane is not a part of any horizon of spacetime. Our results seem to support the view that entropy proportional to area is possessed not only by horizons but by all spacelike two-surfaces of spacetime.

Makela, J

2005-01-01T23:59:59.000Z

289

Accelerating Observers, Area and Entropy  

E-Print Network (OSTI)

We consider an explicit example of a process, where the entropy carried by radiation through an accelerating two-plane is proportional to the decrease in the area of that two-plane even when the two-plane is not a part of any horizon of spacetime. Our results seem to support the view that entropy proportional to area is possessed not only by horizons but by all spacelike two-surfaces of spacetime.

Jarmo Makela

2005-06-16T23:59:59.000Z

290

Accelerators  

NLE Websites -- All DOE Office Websites (Extended Search)

Aceleradores Avanzar Volver Principal ESTOY PERDIDO Los aceleradores le resuelven a los fsicos dos problemas. En primer lugar, dado que todas las partculas se comportan como...

291

Energy Measurement in a Plasma Wakefield Accelerator  

SciTech Connect

In the E-167 plasma wakefield acceleration experiment, electrons with an initial energy of 42GeV are accelerated in a meter-scale lithium plasma. Particles are leaving plasma with a large energy spread. To determine the spectrum of the accelerated particles, a two-plane spectrometer has been set up.

Ischebeck, R

2007-07-06T23:59:59.000Z

292

Proton acceleration experiments with Z-Petawatt.  

Science Conference Proceedings (OSTI)

The outline of this presentation: (1) Proton acceleration with high-power lasers - Target Normal Sheath Acceleration concept; (2) Proton acceleration with mass-reduced targets - Breaking the 60 MeV threshold; (3) Proton beam divergence control - Novel focusing target geometry; and (4) New experimental capability development - Proton radiography on Z.

Arefiev, A. (University of Texas at Austin); Schaumann, G. (Technische Universitat Darmstadt, Germany); Deppert, O. (Technische Universitat Darmstadt, Germany); Rambo, Patrick K.; Roth, M. (Technische Universitat Darmstadt, Germany); Geissel, Matthias; Schwarz, Jens; Sefkow, Adam B.; Atherton, Briggs W.; Kimmel, Mark W.; Schollmeier, Marius; Breizman, B. (University of Texas at Austin)

2010-08-01T23:59:59.000Z

293

Voltage regulation in linear induction accelerators  

DOE Patents (OSTI)

Improvement in voltage regulation in a Linear Induction Accelerator wherein a varistor, such as a metal oxide varistor when it is placed in parallel with the beam accelerating cavity and the magnetic core. The non-linear properties of the varistor result in a more stable voltage across the beam accelerating cavity than with a conventional compensating resistance.

Parsons, W.M.

1991-03-19T23:59:59.000Z

294

Voltage regulation in linear induction accelerators  

DOE Patents (OSTI)

Improvement in voltage regulation in a linear induction accelerator wherein a varistor, such as a metal oxide varistor, is placed in parallel with the beam accelerating cavity and the magnetic core is disclosed. The non-linear properties of the varistor result in a more stable voltage across the beam accelerating cavity than with a conventional compensating resistance. 4 figs.

Parsons, W.M.

1992-12-29T23:59:59.000Z

295

Current Sheet Canting in Pulsed Electromagnetic Accelerators  

E-Print Network (OSTI)

Current Sheet Canting in Pulsed Electromagnetic Accelerators Thomas Edward Markusic A DISSERTATION #12;Current Sheet Canting in Pulsed Electromagnetic Accelerators Prepared by: Thomas Edward Markusic of current sheet canting in pulsed electromagnetic accelerators is the de- parture of the plasma sheet

Choueiri, Edgar

296

Accelerating Clean-up at Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River More Documents & Publications Integrated Project Team RM...

297

Fermilab | Plan for the Future | Fermilab accelerator complex...  

NLE Websites -- All DOE Office Websites (Extended Search)

The Fermilab accelerator complex Fermilab's accelerator complex comprises ten particle accelerators and storage rings. It produces the world's most powerful, high-energy neutrino...

298

Development of Cesium Telluride Photocathodes for the AWA Accelerator...  

NLE Websites -- All DOE Office Websites (Extended Search)

(AWA) facility conducts advanced accelerator research studies for the next generation electron accelerators. The acceleration scheme focuses primarily on the generation of...

299

ACCELERATOR & FUSION RESEARCH DIV. ANNUAL REPORT, OCT. 79 - SEPT. 80  

E-Print Network (OSTI)

34 in Biological and Medical Research with Accelerated Heavyin Biological and Medical Research with Accelerated Heavyin Biological and Medical Research with Accelerated Heavy

Authors, Various

2010-01-01T23:59:59.000Z

300

LASER-PLASMA-ACCELERATOR-BASED GAMMA GAMMA COLLIDERS  

E-Print Network (OSTI)

LASER-PLASMA-ACCELERATOR-BASED ?? COLLIDERS ? C. B.linear col- lider based on laser-plasma-accelerators arediscussed, and a laser-plasma-accelerator-based gamma-

Schroeder, C. B.

2010-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Washington, D.C. 20585 Washington, D.C. 20585 April 25, 2013 2 Environmental Management Site-Specific Advisory Board - April 25, 2013 Meeting Minutes LIST OF ACRONYMS AB - Advisory Board ANL - Argonne National Laboratory ARP - Accelerator Retrieval Project BNL - Brookhaven National Laboratory BRC - Blue Ribbon Commission CAB - Citizens Advisory Board D&D - Decontamination & Decommissioning DDFO - Deputy Designated Federal Officer DOE - Department of Energy DUF6 - Depleted Uranium Hexafluoride DWPF - Defense Waste Processing Facility EIS - Environmental Impact Statement EM - DOE Office of Environmental Management EM SSAB - DOE Office of Environmental Management Site-Specific Advisory Board EPA - U.S. Environmental Protection Agency FY - Fiscal Year

302

Advanced Manufacturing Jobs and Innovation Accelerator Challenge |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Assistance » Advanced Manufacturing Jobs and Innovation Technical Assistance » Advanced Manufacturing Jobs and Innovation Accelerator Challenge Advanced Manufacturing Jobs and Innovation Accelerator Challenge October 10, 2013 - 12:01pm Addthis The Advanced Manufacturing Jobs and Innovation Accelerator Challenge (Accelerator) is a multi-agency sponsored competition established to enhance existing regional networks of firms and institutions that accelerate technology-related innovation, business formation, and job creation. Funding provided to these regional networks (also called clusters) help academia, utilities, local governments, and private industry and investors expand partnerships, share strategic information more efficiently, and reduce costs by leveraging existing assets and resources (like physical facilities and equipment).

303

Accelerator Technology Division progress report, FY 1992  

SciTech Connect

This report briefly discusses the following topics: The Ground Test Accelerator Program; Defense Free-Electron Lasers; AXY Programs; A Next Generation High-Power Neutron-Scattering Facility; JAERI OMEGA Project and Intense Neutron Sources for Materials Testing; Advanced Free-Electron Laser Initiative; Superconducting Supercollider; The High-Power Microwave (HPM) Program; Neutral Particle Beam (NPB) Power Systems Highlights; Industrial Partnering; Accelerator Physics and Special Projects; Magnetic Optics and Beam Diagnostics; Accelerator Design and Engineering; Radio-Frequency Technology; Accelerator Theory and Free-Electron Laser Technology; Accelerator Controls and Automation; Very High-Power Microwave Sources and Effects; and GTA Installation, Commissioning, and Operations.

Schriber, S.O.; Hardekopf, R.A.; Heighway, E.A.

1993-07-01T23:59:59.000Z

304

Environment, safety, and health considerations for a new accelerator facility  

SciTech Connect

A study of siting considerations for possible future accelerators at Fermilab is underway. Each candidate presents important challenges in environment, safety, and health (ES&H) that are reviewed generically in this paper. Some of these considerations are similar to those that have been encountered and solved during the construction and operation of other accelerator facilities. Others have not been encountered previously on the same scale. The novel issues will require particular attention coincident with project design efforts to assure their timely cost-effective resolution. It is concluded that with adequate planning, the issues can be addressed in a manner that merits the support of the Laboratory, the US Department of Energy (DOE), and the public.

J. Donald Cossairt [and others

2001-04-23T23:59:59.000Z

305

Muon Acceleration in Cosmic-ray Sources  

E-Print Network (OSTI)

Many models of ultra-high energy cosmic-ray production involve acceleration in linear accelerators located in Gamma-Ray Bursts magnetars, or other sources. These source models require very high accelerating gradients, $10^{13}$ keV/cm, with the minimum gradient set by the length of the source. At gradients above 1.6 keV/cm, muons produced by hadronic interactions undergo significant acceleration before they decay. This acceleration hardens the neutrino energy spectrum and greatly increases the high-energy neutrino flux. We rule out many models of linear acceleration, setting strong constraints on plasma wakefield accelerators and on models for sources like Gamma Ray Bursts and magnetars.

Spencer R. Klein; Rune Mikkelsen; Julia K. Becker Tjus

2012-08-09T23:59:59.000Z

306

Community Petascale Project for Accelerator Science and Simulation: Advancing Computational Science for Future Accelerators and Accelerator Technologies  

SciTech Connect

The design and performance optimization of particle accelerators are essential for the success of the DOE scientific program in the next decade. Particle accelerators are very complex systems whose accurate description involves a large number of degrees of freedom and requires the inclusion of many physics processes. Building on the success of the SciDAC-1 Accelerator Science and Technology project, the SciDAC-2 Community Petascale Project for Accelerator Science and Simulation (ComPASS) is developing a comprehensive set of interoperable components for beam dynamics, electromagnetics, electron cooling, and laser/plasma acceleration modelling. ComPASS is providing accelerator scientists the tools required to enable the necessary accelerator simulation paradigm shift from high-fidelity single physics process modeling (covered under SciDAC1) to high-fidelity multiphysics modeling. Our computational frameworks have been used to model the behavior of a large number of accelerators and accelerator R&D experiments, assisting both their design and performance optimization. As parallel computational applications, the ComPASS codes have been shown to make effective use of thousands of processors. ComPASS is in the first year of executing its plan to develop the next-generation HPC accelerator modeling tools. ComPASS aims to develop an integrated simulation environment that will utilize existing and new accelerator physics modules with petascale capabilities, by employing modern computing and solver technologies. The ComPASS vision is to deliver to accelerator scientists a virtual accelerator and virtual prototyping modeling environment, with the necessary multiphysics, multiscale capabilities. The plan for this development includes delivering accelerator modeling applications appropriate for each stage of the ComPASS software evolution. Such applications are already being used to address challenging problems in accelerator design and optimization. The ComPASS organization for software development and applications accounts for the natural domain areas (beam dynamics, electromagnetics, and advanced acceleration), and all areas depend on the enabling technologies activities, such as solvers and component technology, to deliver the desired performance and integrated simulation environment. The ComPASS applications focus on computationally challenging problems important for design or performance optimization to all major HEP, NP, and BES accelerator facilities. With the cost and complexity of particle accelerators rising, the use of computation to optimize their designs and find improved operating regimes becomes essential, potentially leading to significant cost savings with modest investment.

Spentzouris, P.; /Fermilab; Cary, J.; /Tech-X, Boulder; McInnes, L.C.; /Argonne; Mori, W.; /UCLA; Ng, C.; /SLAC; Ng, E.; Ryne, R.; /LBL, Berkeley

2011-11-14T23:59:59.000Z

307

HANFORD SITE RIVER CORRIDOR CLEANUP  

SciTech Connect

In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

BAZZELL, K.D.

2006-02-01T23:59:59.000Z

308

Accelerating Clean-up at Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River More Documents & Publications Accelerating Clean-up at...

309

Accelerator experiments contradicting general relativity  

E-Print Network (OSTI)

The deflection of gamma-rays in Earth's gravitational field is tested in laser Compton scattering at high energy accelerators. Within a formalism connecting the bending angle to the photon's momentum it follows that detected gamma-ray spectra are inconsistent with a deflection magnitude of 2.78 nrad, predicted by Einstein's gravity theory. Moreover, preliminary results for 13-28 GeV photons from two different laboratories show opposite - away from the Earth - deflection, amounting to 33.8-0.8 prad. I conclude that general relativity, which describes gravity at low energies precisely, break down at high energies.

Vahagn Gharibyan

2014-01-13T23:59:59.000Z

310

Plasma beat-wave accelerator  

Science Conference Proceedings (OSTI)

We perform an analytic study of some quantities relevant to the plasma beat-wave accelerator (PBWA) concept. We obtain analytic expressions for the plasma frequency, longitudinal electron velocity, plasma density and longitudinal plasma electric field of a nonlinear longitudinal electron plasma oscillation with amplitude less than the wave-breaking limit and phase velocity approaching the speed of light. We also estimate the luminosity of a single-pass e/sup +/e/sup -/ linear PBWA collider assuming the energy and collision beamstrahlung are fixed parameters.

Noble, R.J.

1983-06-01T23:59:59.000Z

311

Wakefields in photonic accelerator structures  

SciTech Connect

Control and manipulation of properties - such as vacuum modal confinement, spatial harmonic content, phase velocity, and group velocity - are reasons why an all-dielectric beam-driven accelerator would be expected to benefit by borrowing from the field of optical bandgap photonics. We outline the general conditions for coherent Cerenkov radiation in a photonic crystal, illustrated by three examples: two Bragg mirrors separated by a vacuum gap, a woodpile with a linear waveguide channel, and a stack of photonic slabs having a planar waveguide channel.

Naranjo, B.; Andonian, G.; Arab, E.; Barber, S.; Fitzmorris, K.; Fukusawa, A.; Hoang, P.; Mahapatra, S.; O'Shea, B.; Valloni, A.; Williams, O.; Yang, C.; Rosenzweig, J. B. [UCLA Dept. of Physics and Astronomy, Los Angeles, CA 90095-1547 (United States)

2012-12-21T23:59:59.000Z

312

Accelerators for heavy ion fusion  

SciTech Connect

Large fusion devices will almost certainly produce net energy. However, a successful commercial fusion energy system must also satisfy important engineering and economic constraints. Inertial confinement fusion power plants driven by multi-stage, heavy-ion accelerators appear capable of meeting these constraints. The reasons behind this promising outlook for heavy-ion fusion are given in this report. This report is based on the transcript of a talk presented at the Symposium on Lasers and Particle Beams for Fusion and Strategic Defense at the University of Rochester on April 17-19, 1985.

Bangerter, R.O.

1985-10-01T23:59:59.000Z

313

Labs and Field Site Histories | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Historical Resources » Labs Historical Resources » Labs and Field Site Histories Labs and Field Site Histories Labs and Field Site Histories Note: Every effort is made to keep these links current and updated. Yet as many of the links below point to sites not under our direct control, some may stop working without warning . National Laboratories & Technology Centers Operations Offices & Field Sites Ames Laboratory (Iowa) -- History Chicago Office (Illinois) -- History Argonne National Laboratory (Illinois) -- Laboratory History and Timeline Fernald Environmental Management Project (Ohio) -- Site History Brookhaven National Laboratory (New York) -- Tour Brookhaven's History Grand Junction (Colorado) -- Site Description and History (pdf - less than 1MB) Fermi National Accelerator Laboratory (Illinois) -- History Idaho Operations Office (Idaho) -- Site History

314

Microsoft PowerPoint - GC webpage Site Map.ppt [Compatibility Mode]  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Consolidated Business Center Environmental Management Consolidated Business Center Consolidated Business Center Environmental Management Consolidated Business Center Office of Legal Services Office of Legal Services Client Sites Client Sites (Includes Environmental Management Mission Support and Legacy Management Sites) (Includes Environmental Management Mission Support and Legacy Management Sites) Arkansas SEFOR-Southwest Experimental Fast Oxide Reactor Arizona Tuba City- Tuba City Disposal Site California OAKLAND - Oakland Projects Office SLAC - Stanford Linear Accelerator Center ETEC - Energy Technology Engineering Center ETEC - Energy Technology Engineering Center GEVNC- GE Vallecitos Nuclear Center LBNL- Lawrence Berkley National Laboratory Colorado ROCKY FLATS - Rocky Flats LM- Grand Junction Office, Slick Rock Site, Rifle Sites and Rulison Site

315

High Performance Computing in Accelerator Science: Past Successes. Future Challenges  

E-Print Network (OSTI)

High Performance Computing in Accelerator Science: PastAC02- 05CH11231. High Performance Computing in Accelerator

Ryne, R.

2013-01-01T23:59:59.000Z

316

RECENT ADVANCES IN THE TECHNOLOGY OF SUPERCONDUCTING ACCELERATOR MAGNETS  

E-Print Network (OSTI)

Accelerator Magnets,· Brookhaven National Laboratory,in Superconducting Magnets,- Brookhaven National Laboratory,Accelerator Magnet Wire," Brookhaven National Laboratory,

Taylor, C.E.

2010-01-01T23:59:59.000Z

317

DOE O 420.2C, Safety of Accelerator Facilities  

Directives, Delegations, and Requirements

The order defines accelerators and establishes accelerator specific safety requirements and approval authorities which, when supplemented by other applicable ...

2011-07-21T23:59:59.000Z

318

Treatment Facility F: Accelerated Removal and Validation Project  

Science Conference Proceedings (OSTI)

The Accelerated Removal and Validation (ARV) phase of remediation at the Treatment Facility F (TFF) site at Lawrence Livermore National Laboratory (LLNL) was designed to accelerate removal of gasoline from the site when compared to normal, single shift, pump-and-treat operations. The intent was to take advantage of the in-place infrastructure plus the increased underground temperatures resulting from the Dynamic Underground Stripping Demonstration Project (DUSDP). Operations continued 24-hours (h) per day between October 4 and December 12, 1993. Three contaminant removal rate enhancement approaches were explored during the period of continuous operation. First, we tried several configurations of the vapor pumping system to maximize the contaminant removal rate. Second, we conducted two brief trials of air injection into the lower steam zone. Results were compared with computer models, and the process was assessed for contaminant removal rate enhancement. Third, we installed equipment to provide additional electrical heating of contaminated low-permeability soil. Four new electrodes were connected into the power system. Diagnostic capabilities at the TFF site were upgraded so that we could safely monitor electrical currents, soil temperatures, and water treatment system processes while approximately 300 kW of electrical energy was being applied to the subsurface.

Sweeney, J.J.; Buettner, M.H.; Carrigan, C.R. [and others

1994-04-01T23:59:59.000Z

319

1998 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Tue, Nov 11, 17:00 Wed, Nov 12, '97 17:00 Mon, Nov 17, '97 18:00-Wed, Nov 19, '97 02:00 32 hrs Mon, Dec 01, '97 17:00 Tue, Dec 02, '97 13:00 Mon, Dec 08, '97 06:00-Wed, Dec 10, '97 02:00 44 hrs Mon, Jan 05, 17:00 Tue, Jan 06, 13:00 Mon, Jan 12, 18:00-Wed, Jan 14, 02:00 32 hrs Fri, Jan 16, 17:00 Tue, Jan 20, 13:00 Mon, Jan 26, 06:00-Wed, Jan 28, 02:00 44 hrs Mon, Feb 02, 17:00 Tue, Feb 03, 13:00 Tue, Feb 10, 18:00-Thu, Feb 12, 02:00 32 hrs Tue, Feb 17, 17:00 Wed, Feb 18, 17:00 Mon, Feb 23, 06:00-Wed, Feb 25, 02:00 44 hrs Mon, Mar 02, 17:00 Tue, Mar 03, 13:00 Mon, Mar 09, 18:00-Wed, Mar 11, 02:00 32 hrs Mon, Mar 16, 17:00 Tue, Mar 17, 13:00 Mon, Mar 23, 06:00-Wed, Mar 25, 02:00 44 hrs

320

1997 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 11, '96 17:00 Tue, Nov 12, '96 13:00 Tue, Nov 19, '96 15:00-Wed, Nov 20, '96 02:00 11 hrs Mon, Dec 02, '96 17:00 Tue, Dec 03, '96 13:00 Mon, Dec 09, '96 06:00-Wed, Dec 11, '96 02:00 44 hrs Mon, Jan 06, 17:00 Tue, Jan 07, 13:00 Mon, Jan 13, 18:00-Wed, Jan 15, 02:00 32 hrs Mon, Jan 20, 17:00 Tue, Jan 21, 13:00 Mon, Jan 27, 06:00-Wed, Jan 29, 02:00 44 hrs Mon, Feb 03, 17:00 Tue, Feb 04, 13:00 Tue, Feb 11, 18:00-Thu, Feb 13, 02:00 32 hrs Mon, Feb 18, 09:30 Tue, Feb 18, 13:00 Mon, Feb 24, 06:00-Wed, Feb 26, 02:00 44 hrs Mon, Mar 03, 17:00 Tue, Mar 04, 13:00 Mon, Mar 10, 18:00-Wed, Mar 12, 02:00 32 hrs Mon, Mar 17, 17:00 Tue, Mar 18, 13:00 Mon, Mar 24, 06:00-Wed, Mar 26, 02:00 44 hrs

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

2000 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 08, '99 17:00 Tue, Nov 09, '99 13:00 Mon, Nov 15, '99 18:00-Wed, Nov 17, '99 02:00 32 hrs Mon, Nov 29, '99 17:00 Tue, Nov 30, '99 13:00 Mon, Dec 06, '99 06:00-Wed, Dec 08, '99 02:00 44 hrs Mon, Jan 03, 17:00 Tue, Jan 04, 13:00 Mon, Jan 10, 18:00-Wed, Jan 12, 02:00 32 hrs Fri, Jan 14, 17:00 Tue, Jan 18, 13:00 Mon, Jan 24, 06:00-Wed, Jan 26, 02:00 44 hrs Mon, Feb 14, 17:00 Tue, Feb 15, 17:00 Tue, Feb 22, 06:00-Thu, Feb 24, 02:00 44 hrs Mon, Feb 28, 17:00 Tue, Feb 29, 13:00 Mon, Mar 06, 18:00-Wed, Mar 08, 02:00 32 hrs Mon, Mar 13, 17:00 Tue, Mar 14, 13:00 Mon, Mar 20, 06:00-Wed, Mar 22, 02:00 44 hrs Mon, Apr 10, 17:00 Tue, Apr 11, 13:00 Mon, Apr 17, 06:00-Wed, Apr 19, 02:00 44 hrs

322

2002 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

SSRL Accelerator Physics Schedule SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 05, '01 17:00 Tue, Nov 06, '01 13:00 Mon, Nov 12, '01 18:00-Wed, Nov 14, '01 02:00 32 hrs Mon, Dec 03, '01 17:00 Tue, Dec 04, '01 13:00 Mon, Dec 10, '01 06:00-Wed, Dec 12, '01 02:00 44 hrs Mon, Dec 17, '01 09:00 Tue, Dec 18, '01 13:00 Mon, Jan 07, 18:00-Wed, Jan 9, 02:00 32 hrs Mon, Jan 14, 12:00 Tue, Jan 15, 13:00 Tue, Jan 22, 06:00-Thu, Jan 24, 02:00 44 hrs Mon, Jan 28, 17:00 Tue, Jan 29, 17:00 Tue, Feb 05, 18:00-Thu, Feb 07, 02:00 32 hrs Mon, Feb 11, 17:00 Tue, Feb 12, 17:00 Tue, Feb 19, 06:00-Wed, Feb 20, 02:00 20 hrs Mon, Feb 25, 17:00 Tue, Feb 26, 13:00 Mon, Mar 04, 18:00-Wed, Mar 06, 02:00 32 hrs Mon, Mar 11, 17:00 Tue, Mar 12, 13:00 Mon, Mar 18, 06:00-Wed, Mar 20, 02:00 44 hrs

323

1999 SSRL Accelerator Physics Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

9 SSRL Accelerator Physics Schedule 9 SSRL Accelerator Physics Schedule Proposal Deadline Schedule Announcement Experimental Period Duration Mon, Nov 30, '98 17:00 Tue, Dec 01, '98 13:00 Mon, Dec 07, '98 06:00-Wed, Dec 09, '98 02:00 44 hrs Mon, Jan 04, 17:00 Tue, Jan 05, 13:00 Mon, Jan 11, 18:00-Wed, Jan 13, 02:00 32 hrs Fri, Jan 15, 17:00 Tue, Jan 19, 13:00 Mon, Jan 25, 06:00-Wed, Jan 27, 02:00 44 hrs Mon, Feb 01, 17:00 Tue, Feb 02, 13:00 Tue, Feb 09, 18:00-Thu, Feb 11, 02:00 32 hrs Tue, Feb 16, 17:00 Wed, Feb 17, 17:00 Mon, Feb 22, 06:00-Wed, Feb 24, 02:00 44 hrs Mon, Mar 01, 17:00 Tue, Mar 02, 13:00 Mon, Mar 08, 18:00-Wed, Mar 10, 02:00 32 hrs Mon, Mar 15, 17:00 Tue, Mar 16, 13:00 Mon, Mar 22, 06:00-Wed, Mar 24, 02:00 44 hrs Mon, Apr 12, 17:00 Tue, Apr 13, 13:00 Mon, Apr 19, 06:00-Wed, Apr 21, 02:00 44 hrs

324

Particle Physics Education Sites  

NLE Websites -- All DOE Office Websites (Extended Search)

Particle Physics Education Sites quick reference Education and Information - National Laboratory Education Programs - Women and Minorities in Physics - Other Physics Sites -...

325

Land Validation web site  

NLE Websites -- All DOE Office Websites (Extended Search)

web site A web site is now available for the Land Validation project. It was created with the purpose of facilitating communication among MODIS Land Validation Principal...

326

Site Lead TQP Standard  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

of specific site safety functions. C. Must have the ability to provide an overall systematic assessment of site safety performance and to characterize the major issues and...

327

Geothermal: Site Map  

Office of Scientific and Technical Information (OSTI)

GEOTHERMAL TECHNOLOGIES LEGACY COLLECTION - Site Map Geothermal Technologies Legacy Collection HelpFAQ | Site Map | Contact Us | Admin Log On HomeBasic Search About Publications...

328

Hanford Site Development Plan  

SciTech Connect

The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. (Westinghouse Hanford Co., Richland, WA (USA)); Yancey, E.F. (Pacific Northwest Lab., Richland, WA (USA))

1990-01-01T23:59:59.000Z

329

Plug & Play Sensors Sites  

Science Conference Proceedings (OSTI)

... Documents. Plug & Play Sensors Sites. ... Plug & Play Sensors Sites. By selecting some of the links below, you will be leaving NIST webspace. ...

2012-06-05T23:59:59.000Z

330

Career Site FAQs | ORNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Careers Working at ORNL Diversity Postdocs Internships and Postgrad Opportunities Fellowships Career Site FAQs Events and Conferences Careers Home | ORNL | Careers | Career Site...

331

Commnity Petascale Project for Accelerator Science and Simulation: Advancing Computational Science for Future Accelerators and Accelerator Technologies  

SciTech Connect

The design and performance optimization of particle accelerators is essential for the success of the DOE scientific program in the next decade. Particle accelerators are very complex systems whose accurate description involves a large number of degrees of freedom and requires the inclusion of many physics processes. Building on the success of the SciDAC1 Accelerator Science and Technology project, the SciDAC2 Community Petascale Project for Accelerator Science and Simulation (ComPASS) is developing a comprehensive set of interoperable components for beam dynamics, electromagnetics, electron cooling, and laser/plasma acceleration modeling. ComPASS is providing accelerator scientists the tools required to enable the necessary accelerator simulation paradigm shift from high-fidelity single physics process modeling (covered under SciDAC1) to high-fidelity multi-physics modeling. Our computational frameworks have been used to model the behavior of a large number of accelerators and accelerator R&D experiments, assisting both their design and performance optimization. As parallel computational applications, the ComPASS codes have been shown to make effective use of thousands of processors.

Spentzouris, Panagiotis; /Fermilab; Cary, John; /Tech-X, Boulder; Mcinnes, Lois Curfman; /Argonne; Mori, Warren; /UCLA; Ng, Cho; /SLAC; Ng, Esmond; Ryne, Robert; /LBL, Berkeley

2008-07-01T23:59:59.000Z

332

Commnity Petascale Project for Accelerator Science And Simulation: Advancing Computational Science for Future Accelerators And Accelerator Technologies  

SciTech Connect

The design and performance optimization of particle accelerators are essential for the success of the DOE scientific program in the next decade. Particle accelerators are very complex systems whose accurate description involves a large number of degrees of freedom and requires the inclusion of many physics processes. Building on the success of the SciDAC-1 Accelerator Science and Technology project, the SciDAC-2 Community Petascale Project for Accelerator Science and Simulation (ComPASS) is developing a comprehensive set of interoperable components for beam dynamics, electromagnetics, electron cooling, and laser/plasma acceleration modelling. ComPASS is providing accelerator scientists the tools required to enable the necessary accelerator simulation paradigm shift from high-fidelity single physics process modeling (covered under SciDAC1) to high-fidelity multiphysics modeling. Our computational frameworks have been used to model the behavior of a large number of accelerators and accelerator R&D experiments, assisting both their design and performance optimization. As parallel computational applications, the ComPASS codes have been shown to make effective use of thousands of processors.

Spentzouris, Panagiotis; /Fermilab; Cary, John; /Tech-X, Boulder; Mcinnes, Lois Curfman; /Argonne; Mori, Warren; /UCLA; Ng, Cho; /SLAC; Ng, Esmond; Ryne, Robert; /LBL, Berkeley

2011-10-21T23:59:59.000Z

333

High Transformer ratios in collinear wakefield accelerators.  

Science Conference Proceedings (OSTI)

Based on our previous experiment that successfully demonstrated wakefield transformer ratio enhancement in a 13.625 GHz dielectric-loaded collinear wakefield accelerator using the ramped bunch train technique, we present here a redesigned experimental scheme for even higher enhancement of the efficiency of this accelerator. Design of a collinear wakefield device with a transformer ratio R2, is presented. Using a ramped bunch train (RBT) rather than a single drive bunch, the enhanced transformer ratio (ETR) technique is able to increase the transformer ratio R above the ordinary limit of 2. To match the wavelength of the fundamental mode of the wakefield with the bunch length (sigmaz=2 mm) of the new Argonne wakefield accelerator (AWA) drive gun (where the experiment will be performed), a 26.625 GHz dielectric based accelerating structure is required. This transformer ratio enhancement technique based on our dielectric-loaded waveguide design will result in a compact, high efficiency accelerating structures for future wakefield accelerators.

Power, J. G.; Conde, M.; Yusof, Z.; Gai, W.; Jing, C.; Kanreykin, A.; Schoessow, P.; High Energy Physics; Euclid Techlabs, LLC

2008-01-01T23:59:59.000Z

334

EA-1904: Linac Coherent Light Source II at Stanford Linear Accelerator  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

04: Linac Coherent Light Source II at Stanford Linear 04: Linac Coherent Light Source II at Stanford Linear Accelerator Laboratory, San Mateo, California EA-1904: Linac Coherent Light Source II at Stanford Linear Accelerator Laboratory, San Mateo, California Summary This EA evaluates the environmental impacts of the proposed construction of the Linac Coherent Light Source at SLAC National Accelerator Laboratory, Menlo Park, California. Public Comment Opportunities None available at this time. For more information, contact: Mr. Dave Osugi DOE SLAC Site Office 2575 Sand Hill Road, MS8A Menlo Park, CA 94025 Electronic mail: dave.osugi@sso.science.doe.gov Documents Available for Download March 7, 2012 EA-1904: Finding of No Significant Impact Linac Coherent Light Source II at Stanford Linear Accelerator Laboratory, San Mateo, CA

335

EA-1904: Linac Coherent Light Source II at Stanford Linear Accelerator  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4: Linac Coherent Light Source II at Stanford Linear 4: Linac Coherent Light Source II at Stanford Linear Accelerator Laboratory, San Mateo, California EA-1904: Linac Coherent Light Source II at Stanford Linear Accelerator Laboratory, San Mateo, California Summary This EA evaluates the environmental impacts of the proposed construction of the Linac Coherent Light Source at SLAC National Accelerator Laboratory, Menlo Park, California. Public Comment Opportunities None available at this time. For more information, contact: Mr. Dave Osugi DOE SLAC Site Office 2575 Sand Hill Road, MS8A Menlo Park, CA 94025 Electronic mail: dave.osugi@sso.science.doe.gov Documents Available for Download March 7, 2012 EA-1904: Finding of No Significant Impact Linac Coherent Light Source II at Stanford Linear Accelerator Laboratory, San Mateo, CA

336

Photon damping in cosmic-ray acceleration in active galactic nuclei  

SciTech Connect

The usual assumption of the acceleration of ultra high energy cosmic rays, greater than or equal to 10/sup 18/ eV in quasars, Seyfert galaxies and other active galactic nuclei is challenged on the basis of the photon interactions with the accelerated nucleons. This is similar to the effect of the black body radiation on particles > 10/sup 20/ eV for times of the age of the universe except that the photon spectrum is harder and the energy density greater by approx. = 10/sup 15/. Hence, a single traversal, radial or circumferential, of radiation whose energy density is no greater than the emitted flux will damp an ultra high energy. Hence, it is unlikely that any reasonable configuration of acceleration can void disastrous photon energy loss. A different site for ultra high energy cosmic ray acceleration must be found.

Colgate, S.A.

1983-04-07T23:59:59.000Z

337

Electron acceleration in solar noise storms  

E-Print Network (OSTI)

We present an up-to-date review of the physics of electron acceleration in solar noi se storms. We describe the observed characteristics of noise storm emission, emphasi zing recent advances in imaging observations. We briefly describe the general method ology of treating particle acceleration problems and apply it to the specific proble m of electron acceleration in noise storms. We dwell on the issue of the efficiency of the overall noise storm emission process and outline open problems in this area.

Subramanian, P

2007-01-01T23:59:59.000Z

338

Electron acceleration in solar noise storms  

E-Print Network (OSTI)

We present an up-to-date review of the physics of electron acceleration in solar noi se storms. We describe the observed characteristics of noise storm emission, emphasi zing recent advances in imaging observations. We briefly describe the general method ology of treating particle acceleration problems and apply it to the specific proble m of electron acceleration in noise storms. We dwell on the issue of the efficiency of the overall noise storm emission process and outline open problems in this area.

Prasad Subramanian

2007-01-23T23:59:59.000Z

339

Solar system constraints on Rindler acceleration  

E-Print Network (OSTI)

We discuss the classical tests of general relativity in the presence of Rindler acceleration. Among these tests the perihelion shifts give the tightest constraints and indicate that the Pioneer anomaly cannot be caused by a universal solar system Rindler acceleration. We address potential caveats for massive test-objects. Our tightest bound on Rindler acceleration that comes with no caveats is derived from radar echo delay and yields |a|<3nm/s^2.

Sante Carloni; Daniel Grumiller; Florian Preis

2011-03-01T23:59:59.000Z

340

Accelerator Technology Division progress report, FY 1993  

Science Conference Proceedings (OSTI)

This report discusses the following topics: A Next-Generation Spallation-Neutron Source; Accelerator Performance Demonstration Facility; APEX Free-Electron Laser Project; The Ground Test Accelerator (GTA) Program; Intense Neutron Source for Materials Testing; Linac Physics and Special Projects; Magnetic Optics and Beam Diagnostics; Radio-Frequency Technology; Accelerator Controls and Automation; Very High-Power Microwave Sources and Effects; and GTA Installation, Commissioning, and Operation.

Schriber, S.O.; Hardekopf, R.A.; Heighway, E.A.

1993-12-31T23:59:59.000Z

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Application of Phase Diagram Calculation to Accelerated ...  

Science Conference Proceedings (OSTI)

Presentation Title, Application of Phase Diagram Calculation to Accelerated Development of Mo-Si-B Based Alloys. Author(s), Ying Yang, H Bei, Shuanglin ...

342

Science Accelerator : Main View : Deep Federated Search  

NLE Websites -- All DOE Office Websites (Extended Search)

Us | OSTI HOME ADVANCED SEARCH ALERTS ABOUT RESOURCE DESCRIPTIONS Powered by Deep Web Technologies Science Accelerator QR Code | RSS | RSS Archive | Share | Widget Help |...

343

Particle Acceleration by Electromagnetic-Dominated Outflows  

E-Print Network (OSTI)

We review recent developments in particle acceleration by Poynting flux using plasma kinetic simulations, and discuss their potential applications to gamma-ray burst phenomenology

Edison Liang; Koichi Noguchi

2006-04-19T23:59:59.000Z

344

Particle Acceleration by Electromagnetic-Dominated Outflows  

E-Print Network (OSTI)

We review recent developments in particle acceleration by Poynting flux using plasma kinetic simulations, and discuss their potential applications to gamma-ray burst phenomenology

Liang, E; Liang, Edison; Noguchi, Koichi

2006-01-01T23:59:59.000Z

345

Accelerator Operations and Physics - Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Data Review Fill History RMD Reports ASD AES XSD APS Argonne Accelerator Operations & Physics Operational Items Storage ring current and lifetime On-axis Brilliance Plots Source...

346

Inexact and accelerated proximal point algorithms  

E-Print Network (OSTI)

required, with the sum of total errors that can be possibly infinite. This is a remarkable fact that does not occur in the classical (non accelerated) proximal point ...

347

Physics Out Loud - SRF Accelerator Cavities  

NLE Websites -- All DOE Office Websites (Extended Search)

Short-range Correlations Previous Video (Short-range Correlations) Physics Out Loud Main Index Next Video (User Facility) User Facility SRF Accelerator Cavities Charlie Reece, an...

348

Accelerators for Testing Radiation Tolerances of Electronics...  

Office of Science (SC) Website

upgrades in 2001, 2003 (TAMU) Result of NP research: Accelerator Physics development and energy loss studies Application currently being supported by: Large number of government...

349

High-Energy Laser Ponderomotive Acceleration  

SciTech Connect

A new concept of TeV-range laser ponderomotive acceleration in a plasma is proposed. Particles are accelerated in the point-like scattering by the leading front of the laser pulse, propagating at the group velocity less than the vacuum speed of light. In this scheme, the gain in particle energy is determined by the group velocity and does not depend on laser intensity, which determines the quantum probability of acceleration. The quantum and classical analysis of the scheme proposed is presented. Estimates show that the concept proposed is a promising technique for compact laser acceleration of TeV energy range.

Smetanin, I.V.; /Lebedev Inst.; Barnes, C.; /SLAC; Nakajima, K.; /KEK, Tsukuba

2006-03-10T23:59:59.000Z

350

Offshore Wind Accelerator | Open Energy Information  

Open Energy Info (EERE)

Sector Wind energy Product Research and development initiative aimed at cutting the cost of offshore wind energy. References Offshore Wind Accelerator1 LinkedIn Connections...

351

Science Accelerator Resource Descriptions, Office of Scientific...  

NLE Websites -- All DOE Office Websites (Extended Search)

Resource Descriptions Below you will find descriptions of each of the scientific and technical resources searchable in the Science Accelerator. DOE Data Explorer Locate collections...

352

Mission of the Accelerator Systems Division  

NLE Websites -- All DOE Office Websites (Extended Search)

Photon Source and to pursue research and development profitable to the science of accelerators and future light source technologies. This mission is accomplished by pursuing the...

353

SLAC National Accelerator Laboratory - Facility for Advanced...  

NLE Websites -- All DOE Office Websites (Extended Search)

2012 as a test bed for technologies that will power the next generation of particle accelerators. It also hosts experiments that require extreme electric and magnetic fields. Visit...

354

International Conference on Accelerator and Large Experimental...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Large Experimental Physics Control Systems Covering control system topics for accelerators, telescopes, fusion, physics detectors, space exploration, and more Proceedings...

355

Venture Acceleration Fund now accepting 2012 applications  

NLE Websites -- All DOE Office Websites (Extended Search)

2012 applications Venture Acceleration Fund now accepting 2012 applications The three companies selected will receive up to 100,000 each to commercialize technology and take it to...

356

SLAC National Accelerator Laboratory - About SLAC  

NLE Websites -- All DOE Office Websites (Extended Search)

About SLAC Overview Director's Office Vision & Mission Organization History Brochures Contact SLAC About SLAC SLAC lab at night Since its opening in 1962, SLAC National Accelerator...

357

SLAC National Accelerator Laboratory - SLAC Overview  

NLE Websites -- All DOE Office Websites (Extended Search)

SLAC Overview An aerial image of SLAC's facilities SLAC National Accelerator Laboratory is one of 10 Department of Energy (DOE) Office of Science laboratories and is operated by...

358

SLAC National Accelerator Laboratory - Novel Magnetic, Superconducting...  

NLE Websites -- All DOE Office Websites (Extended Search)

Materials and Energy Science (SIMES), a joint institute of the Department of Energy's SLAC National Accelerator Laboratory and Stanford University, opens "exciting possibilities...

359

SLAC National Accelerator Laboratory - Panofsky Prize Honors...  

NLE Websites -- All DOE Office Websites (Extended Search)

and Lawrence Berkeley National Laboratory, and Cabrera, of Stanford University and SLAC National Accelerator Laboratory, have sought the same answers in deep shafts largely...

360

SLAC National Accelerator Laboratory - Experiment Finds Ulcer...  

NLE Websites -- All DOE Office Websites (Extended Search)

10, 2012 Menlo Park, Calif. - Experiments at the U.S. Department of Energy's (DOE) SLAC National Accelerator Laboratory have revealed a potential new way to attack common...

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

SLAC National Accelerator Laboratory - Roger Blandford Receives...  

NLE Websites -- All DOE Office Websites (Extended Search)

Institute for Particle Astrophysics and Cosmology, which is jointly run by Stanford and SLAC National Accelerator Laboratory, and is a professor of particle physics and...

362

SLAC National Accelerator Laboratory - Speakers Bureau  

NLE Websites -- All DOE Office Websites (Extended Search)

accelerator technology, chemistry, astrophysics and more. For more information or to book a speaker, please contact the Office of Communications. RELATED LINKS Contact SLAC...

363

An Accelerator Control Middle Layer Using MATLAB  

E-Print Network (OSTI)

Accelerator Control." SSRL Memo, March, [5] G. Portmann, “ALS (LBNL) and SPEAR3 (SSRL) but easily ports to othereffort between ALS and SSRL, many of the control functions

Portmann, Gregory J.; Corbett, Jeff; Terebilo, Andrei

2005-01-01T23:59:59.000Z

364

SLAC National Accelerator Laboratory - LCLS Graphite Experiment...  

NLE Websites -- All DOE Office Websites (Extended Search)

LCLS Graphite Experiment Poses New Questions for Researchers By Glenn Roberts Jr. May 21, 2012 In experiments at SLAC National Accelerator Laboratory, a powerful X-ray laser...

365

Slow Waveguide Structures for Particle Accelerators  

A waveguide design that can save time and money in the construction and tuning ofa particle accelerator was developed by ORNL researchers. Particle ...

366

Thomas Jefferson National Accelerator Facility Technologies ...  

Jefferson Lab also conducts a variety of research using its Free-Electron Laser, which is based on the same electron-accelerating technology used in CEBAF.

367

Audit Report Hanford Site Contractors' Use of Site Services,...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report Hanford Site Contractors' Use of Site Services, WR-B-99-03 Audit Report Hanford Site Contractors' Use of Site Services, WR-B-99-03 To operate the Hanford Site (Site),...

368

Accelerating polarized beams in Tevatron  

SciTech Connect

In this paper, we will examine the totality of equipment, manpower and cost necessary to obtain a polarized proton beam in the Tevatron. We will not, however, be concerned with the acquisition and acceleration of polarized /bar p/ beams. Furthermore we will consider only a planar main ring without overpass, although it is expected that Siberian snake schemes could be made to apply equally well to non-planar machines. In addition to not wanting to tackle here the task of reformulating the theory for a non-planar closed orbit, we also anticipate that as part of the Tevatron upgrade the main ring will in the not too distant future, be replaced by a planar main injector situated in a separate tunnel. 4 refs., 11 figs., 1 tab.

Teng, L.C.

1989-02-01T23:59:59.000Z

369

FEL-accelerator related diagnostics  

SciTech Connect

Free Electron Lasers (FEL) present a unique set of beam parameters to the diagnostics suite. The FEL requires characterization of the full six dimensional phase space of the electron beam at the wiggler and accurate alignment of the electron beam to the optical mode of the laser. In addition to the FEL requirements on the diagnostics suite, the Jefferson Lab FEL is operated as an Energy Recovered Linac (ERL) which imposes additional requirements on the diagnostics. The ERL aspect of the Jefferson Lab FEL requires that diagnostics operate over a unique dynamic range and operate with simultaneous transport of the accelerated and energy recovered beams. This talk will present how these challenges are addressed at the Jefferson Lab FEL.

Kevin Jordan; David Douglas; Stephen V. Benson; Pavel Evtuschenko

2007-08-02T23:59:59.000Z

370

Interactive troubleshooting guide for accelerators  

Science Conference Proceedings (OSTI)

Modern accelerators face the challenge of supporting increased machine complexity and higher levels of utilization while relying on downsized maintenance and support groups. To improve system availability, reduce reliance on system experts and provide a systematic approach to problem solving, an interactive troubleshooting guide has been implemented for the CEBAF injector at Jefferson lab. This guide, which uses a tree structure with appropriate hypertext links, traces problems from a set of symptoms, through a series of diagnostic tests, to a specific corrective action. This guide is used in conjunction with an active parameter monitoring system that is part of the EPICS control system tool kit. The monitoring system generates operator alarms when injector RF or magnet parameters fall outside pre-set windows. Operators receive immediate feedback when injector components vary from their standard values and the troubleshooting guide provides a systematic means to identify and ultimately correct the problem.

Legg, R.; Dunham, B.; Higgins, S.; Kazimi, R.; Kehne, D.; Oren, T.

1997-12-01T23:59:59.000Z

371

Retrieval Group Sites  

Science Conference Proceedings (OSTI)

... Information Retrieval Tools and Systems: ... currently unavailable. Other sites with extensive information retrieval (IR) links: ...

372

Accelerator transmutation of waste economics  

Science Conference Proceedings (OSTI)

A parametric systems model of the accelerator transmutation of (nuclear) waste (ATW) is used to examine key system trade-offs and design drivers on the basis of unit costs. This model is applied primarily to a fluid-fuel blanket concept for an ATW that generates net electric power from the fissioning of spent commercial reactor fuel. An important goal of this study is the development of essential parametric trade-offs to aid in any future conceptual engineering design of an ATW that would burn spent commercial fuel and generate net electric power. As such, costing procedures and methodologies used to estimate and compare advanced nuclear power generation systems are applied. The cost of electricity required by an electrical power-generating ATW fueled with spent commercial fuels is generally found to be above that projected for other advanced fission power plants. The accelerator and the chemical plant equipment cost accounts are quantitatively identified as main cost drivers, with the capital cost of radio-frequency power dominating the former. Significant reductions of this cost differential are possible by increased blanket neutron multiplication, increased plant capacity, or increased thermal-to-electric conversion efficiency. The benefits of reduced long-lived fission products and spent commercial fuel actinides provided by the ATW approach translate into a less tangible source of revenue to be provided by a charge that must be levied on the client fission power plants being serviced. The main goal of this study, however, is not a direct cost comparison but is instead a quantitative determination of cost-based sensitivity of key cost drivers and operational modes for an ATW concept that would address the growing spent commercial fuel problem; parametric results presented focus on this goal, and a specific ATW ``straw man`` is given to achieve this main objective.

Krakowski, R.A. [Los Alamos National Lab., NM (United States)

1995-06-01T23:59:59.000Z

373

Report on accelerated corrosion studies.  

SciTech Connect

Sandia National Laboratories (SNL) conducted accelerated atmospheric corrosion testing for the U.S. Consumer Product Safety Commission (CPSC) to help further the understanding of the development of corrosion products on conductor materials in household electrical components exposed to environmental conditions representative of homes constructed with problem drywall. The conditions of the accelerated testing were chosen to produce corrosion product growth that would be consistent with long-term exposure to environments containing humidity and parts per billion (ppb) levels of hydrogen sulfide (H{sub 2}S) that are thought to have been the source of corrosion in electrical components from affected homes. This report documents the test set-up, monitoring of electrical performance of powered electrical components during the exposure, and the materials characterization conducted on wires, screws, and contact plates from selected electrical components. No degradation in electrical performance (measured via voltage drop) was measured during the course of the 8-week exposure, which was approximately equivalent to 40 years of exposure in a light industrial environment. Analyses show that corrosion products consisting of various phases of copper sulfide, copper sulfate, and copper oxide are found on exposed surfaces of the conductor materials including wires, screws, and contact plates. The morphology and the thickness of the corrosion products showed a range of character. In some of the copper wires that were observed, corrosion product had flaked or spalled off the surface, exposing fresh metal to the reaction with the contaminant gasses; however, there was no significant change in the wire cross-sectional area.

Mowry, Curtis Dale; Glass, Sarah Jill; Sorensen, Neil Robert

2011-03-01T23:59:59.000Z

374

DOE - Office of Legacy Management -- Mound Site  

Office of Legacy Management (LM)

Site Fairfield Site Falls City Site Fernald Preserve Gasbuggy Site General Atomics Geothermal Gnome-Coach Site Grand Junction Sites Granite City Site Green River Site Gunnison...

375

Categorical Exclusion Determinations: Fermi Site Office | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fermi Site Office Fermi Site Office Categorical Exclusion Determinations: Fermi Site Office Categorical Exclusion Determinations issued by Fermi Site Office. DOCUMENTS AVAILABLE FOR DOWNLOAD June 7, 2013 CX-010532: Categorical Exclusion Determination Various Demolition Jobs CX(s) Applied: B1.23 Date: 06/07/2013 Location(s): Illinois Offices(s): Fermi Site Office March 27, 2013 CX-010387: Categorical Exclusion Determination The Geotechnical Investigation of the Long Baseline Neutrino Experiment Detector Site in South Dakota CX(s) Applied: B3.1 Date: 03/27/2013 Location(s): South Dakota Offices(s): Fermi Site Office February 20, 2013 CX-010388: Categorical Exclusion Determination Northern Illinois Center for Accelerator and Detector Development Extrusion Line Facility CX(s) Applied: B1.15

376

Convergence acceleration techniques in CAD systems for grounding analysis in layered soils  

E-Print Network (OSTI)

by ground rods vertically thrusted in certain places of the substation site. Thus, when a fault conditionConvergence acceleration techniques in CAD systems for grounding analysis in layered soils I a numerical formulation based on the Boundary Element Method for the analysis of grounding systems embedded

Colominas, Ignasi

377

Source control strategy accelerates remediation  

SciTech Connect

Shallow land burial of ion-level radioactive wastes at ORNL has resulted in the release of contaminants into surrounding soil, groundwater, and surface water. Multiple contaminated areas occurring in close proximity make it difficult to relate contaminant releases to a specific site. To address this issue, similar and contiguous contaminated sites within the same drainage area have been combined into Waste Area Groupings. These Waste Area Groupings were prioritized and became the focus of the Comprehensive Environmental Response, Compensation, and Liability Act remediation process. Since the majority of the groupings are in the White Oak Creek drainage basin, the remediation strategy is to control contaminant releases from these source areas first, followed by remediation of White Oak Creek. In planning the remediation program, it became clear that until the issues of ultimate land use and institutional control, waste treatment technologies, and waste disposal facilities are resolved, final remediation objectives cannot be defined and remedial alternatives cannot be evaluated. Consequently, instead of postponing remedial actions until these issues are resolved, a strategy to control the sources of contaminant release with a serie s of interim actions was developed. In the near term, this strategy reduces off-site risk by eliminating contaminant releases and controls on-site risk through institutional control. Source control will allow time to achieve consensus on long-term institutional control and land use issues to develop appropriate treatment technologies, and to construct the necessary disposal facilities without further environmental degradation.

Garland, S.B. II [Oak Ridge National Lab., TN (United States); Hammond, R. [Environmental Protection Agency, Atlanta, GA (United States). Region IV

1993-06-01T23:59:59.000Z

378

Treatment Planning for Accelerator-Based Boron Neutron Capture Therapy  

SciTech Connect

Glioblastoma multiforme and metastatic melanoma are frequent brain tumors in adults and presently still incurable diseases. Boron Neutron Capture Therapy (BNCT) is a promising alternative for this kind of pathologies. Accelerators have been proposed for BNCT as a way to circumvent the problem of siting reactors in hospitals and for their relative simplicity and lower cost among other advantages. Considerable effort is going into the development of accelerator-based BNCT neutron sources in Argentina. Epithermal neutron beams will be produced through appropriate proton-induced nuclear reactions and optimized beam shaping assemblies. Using these sources, computational dose distributions were evaluated in a real patient with diagnosed glioblastoma treated with BNCT. The simulated irradiation was delivered in order to optimize dose to the tumors within the normal tissue constraints. Using Monte Carlo radiation transport calculations, dose distributions were generated for brain, skin and tumor. Also, the dosimetry was studied by computing cumulative dose-volume histograms for volumes of interest. The results suggest acceptable skin average dose and a significant dose delivered to tumor with low average whole brain dose for irradiation times less than 60 minutes, indicating a good performance of an accelerator-based BNCT treatment.

Herrera, Maria S.; Gonzalez, Sara J. [Comision National de Energia Atomica and CONICET, Buenos Aires (Argentina); Minsky, Daniel M.; Kreiner, Andres J. [Comision National de Energia Atomica and CONICET, Buenos Aires (Argentina); Escuela de Ciencia y Tecnologia, UNSAM, Buenos Aires (Argentina)

2010-08-04T23:59:59.000Z

379

Environmental Survey preliminary report, Fermi National Accelerator Laboratory, Batavia, Illinois  

SciTech Connect

This report presents the preliminary findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Fermi National Accelerator Laboratory (Fermilab), conducted September 14 through 25, 1987. The Survey is being conducted by an interdisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual participants for the Survey team are being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with Fermilab. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations performed at Fermilab, and interviews with site personnel. 110 refs., 26 figs., 41 tabs.

Not Available

1988-10-01T23:59:59.000Z

380

Comparison of the plasma beat wave accelerator and the plasma wake field accelerator  

SciTech Connect

In this paper we compare the Plasma Beat Wave Accelerator and Plasma Wake Field Accelerator. We show that the electric fields in the plasma for both schemes are very similar, and thus the dynamics of the driven beams are very similar. The differences appear in the parameters associated with the driving beams. In particular to obtain a given accelerating gradient, the Plasma Wake Field Accelerator has a higher efficiency and a lower total energy for the driving beam. 7 refs., 2 tabs.

Chen, P.; Ruth, R.D.

1985-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Annual Site Environmental Report: 2002  

Science Conference Proceedings (OSTI)

This report provides information about environmental programs during 2002 at the Stanford Linear Accelerator Center (SLAC). Seasonal activities that span calendar years are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded, research and development center with Stanford University as the M&O contractor. The most noteworthy information in this report is summarized in this section. This summary demonstrates the effective application of SLAC environmental management in meeting the site's integrated safety management system (ISMS) goals. For normal daily activities, all SLAC managers and supervisors are responsible for ensuring that proper procedures are followed so that worker safety and health are protected; the environment is protected; and compliance is ensured. Throughout 2002, SLAC focused on these activities through the SLAC management systems (described in Chapter 3). These systems were also the way SLAC approached implementing ''greening of the government'' initiatives such as Executive Order 13148. The management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC did not receive any notices of violation during 2002. In addition, many improvements were continued during 2002, in decreasing air emission rates, the storm drain system, groundwater restoration, and planning for a chemical management system to manage chemical use better.

Nuckolls, H.; /SLAC

2006-04-19T23:59:59.000Z

382

Annual Site Environmental Report: 2005  

SciTech Connect

This report provides information about environmental programs during 2005 at the Stanford Linear Accelerator Center (SLAC). Seasonal activities that span calendar years are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. SLAC effectively applied environmental management in meeting the site's integrated safety and environmental management system (ISEMS) goals. For normal daily activities, all SLAC managers and supervisors are responsible for ensuring that proper procedures are followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2005, SLAC focused on these activities through the SLAC management systems (described in Chapter 3). These systems were also the way SLAC approached implementing ''greening of the government'' initiatives such as Executive Order 13148. The management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. There were no reportable releases to the environment from SLAC operations during 2005. In addition, many improvements were continued during 2005, in waste minimization, recycling, stormwater drain system, groundwater restoration, and implementing a chemical management system (CMS) to better manage chemical use. Program-specific details are discussed.

sabba, d

2007-02-03T23:59:59.000Z

383

Annual Site Environmental Report: 2005  

SciTech Connect

This report provides information about environmental programs during 2005 at the Stanford Linear Accelerator Center (SLAC). Seasonal activities that span calendar years are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. SLAC effectively applied environmental management in meeting the site's integrated safety and environmental management system (ISEMS) goals. For normal daily activities, all SLAC managers and supervisors are responsible for ensuring that proper procedures are followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2005, SLAC focused on these activities through the SLAC management systems (described in Chapter 3). These systems were also the way SLAC approached implementing ''greening of the government'' initiatives such as Executive Order 13148. The management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. There were no reportable releases to the environment from SLAC operations during 2005. In addition, many improvements were continued during 2005, in waste minimization, recycling, stormwater drain system, groundwater restoration, and implementing a chemical management system (CMS) to better manage chemical use. Program-specific details are discussed.

sabba, d

2007-02-03T23:59:59.000Z

384

The Heating & Acceleration of the Solar Wind  

E-Print Network (OSTI)

The Heating & Acceleration of the Solar Wind Eliot Quataert (UC Berkeley) Collaborators: Steve & Slow Winds · The Puzzle of the High Frequency Cascade (or the lack thereof ....) · Possible Solutions #12;Background · Heating required to accelerate the solar wind · Early models invoked e- conduction

Wurtele, Jonathan

385

RHIC sextant test: Accelerator systems and performance  

SciTech Connect

One sextant of the RHIC Collider was commissioned in early 1997 with beam. We describe here the performance of the accelerator systems, instrumentation subsystems and application software. We also describe a ramping test without beam that took place after the commissioning with beam. Finally, we analyze the implications of accelerator systems performance and their impact on the planning for RHIC installation and commissioning.

Pilat, F.; Trbojevic, D.; Ahrens, L. [and others

1997-08-01T23:59:59.000Z

386

Accelerator Production Options for 99MO  

SciTech Connect

Shortages of {sup 99}Mo, the most commonly used diagnostic medical isotope, have caused great concern and have prompted numerous suggestions for alternate production methods. A wide variety of accelerator-based approaches have been suggested. In this paper we survey and compare the various accelerator-based approaches.

Bertsche, Kirk; /SLAC

2010-08-25T23:59:59.000Z

387

Cohesion: a hybrid memory model for accelerators  

Science Conference Proceedings (OSTI)

Two broad classes of memory models are available today: models with hardware cache coherence, used in conventional chip multiprocessors, and models that rely upon software to manage coherence, found in compute accelerators. In some systems, both types ... Keywords: accelerator, cache coherence, computer architecture

John H. Kelm; Daniel R. Johnson; William Tuohy; Steven S. Lumetta; Sanjay J. Patel

2010-06-01T23:59:59.000Z

388

Very high energy heavy-ion accelerators  

SciTech Connect

A review is given of various programs for building heavy ion accelerators. Topics discussed are (1) options of reaching very high energies with heavy ions; (2) present performance of the superHILAC and the Bevalac; (3) heavy ion sources; (4) applications of heavy ion accelerators outside of basic research; and (5) reliability and operating costs of heavy ion sources. (PMA)

Grunder, H.A.

1975-10-01T23:59:59.000Z

389

Magnetic instabilities in accelerating plasma surfaces  

SciTech Connect

The existence of an interchange instability strictly associated with electron inertia is demonstrated. This is characterized by a growth rate significantly larger than the usual ion-inertial Rayleigh-Taylor rate and by self-generated magnetic fields localized around the accelerating plasma surface. This novel instability may be partially responsible for the observed magnetic fields in ablatively accelerated laser plasmas.

Amendt, P.; Rahman, H.U.; Strauss, M.

1984-09-24T23:59:59.000Z

390

Does The Pioneer Anomalous Acceleration Really Exist?  

E-Print Network (OSTI)

The analysis of the Pioneer 10 and 11 data demonstrated the presence of an anomalous Doppler frequency blue-shift drift which is interpreted as an anomalous acceleration. The Doppler frequency dirft follows by considering the motions of the Pioneers in the universe, i.e. it is of cosmological origin. There is no anomalous acceleration.

Walter Petry

2005-09-21T23:59:59.000Z

391

A Survey of Hadron Therapy Accelerator Technologies.  

SciTech Connect

Hadron therapy has entered a new age [1]. The number of facilities grows steadily, and 'consumer' interest is high. Some groups are working on new accelerator technology, while others optimize existing designs by reducing capital and operating costs, and improving performance. This paper surveys the current requirements and directions in accelerator technology for hadron therapy.

PEGGS,S.; SATOGATA, T.; FLANZ, J.

2007-06-25T23:59:59.000Z

392

Hanford Site Strategic Facilities Plan: Site planning  

SciTech Connect

This plan revises the Hanford Site Strategic Facilities Plan submitted by Westinghouse Hanford Company in 1988. It separates the Hanford Site facilities into two categories: ''strategically required'' facilities and ''marginal'' facilities. It provides a comparison of future facility requirements against existing capacities and proposed projects to eliminate or consolidate marginal facilities (i.e., those facilities that are not fully utilized or are no longer required to accomplish programmatic missions). The objective is to enhance the operating efficiency of the Hanford Site by maximizing facility use and minimizing unnecessary facility operating and maintenance costs. 11 refs.

1989-03-01T23:59:59.000Z

393

Independent Oversight Inspection, Stanford Linear Accelerator Center -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Stanford Linear Accelerator Stanford Linear Accelerator Center - January 2007 Independent Oversight Inspection, Stanford Linear Accelerator Center - January 2007 January 2007 Inspection of Environment, Safety, and Health Programs at the Stanford Linear Accelerator Center The U.S. Department of Energy (DOE) Office of Independent Oversight, within the Office of Health, Safety and Security, conducted an inspection of environment, safety, and health (ES&H) programs at the DOE Stanford Linear Accelerator Center (SLAC) during October and November 2006. The inspection was performed by Independent Oversight's Office of Environment, Safety and Health Evaluations. Since the 2004 Type A electrical accident, SSO and SLAC have made improvements in many aspects of ES&H programs. However, the deficiencies in

394

Accelerator Operations and Technology, AOT: LANL  

NLE Websites -- All DOE Office Websites (Extended Search)

ADE Accelerator and Operations Technology, AOT ADE Accelerator and Operations Technology, AOT About Us AOT Home Groups Accelerator, Beam Science High Power Electrodynamics Instrumentation, Controls Mechanical Design Engineering Operations Radio Frequency Engineering CONTACTS Division Leader John Erickson Deputy Division Leader for Operations Martha Zumbro Deputy Division Leader for Technology Subrata Nath Administrator Jean N. Trujillo Phone: (505) 665-2683 Put a short description of the graphic or its primary message here Accelerator and Operations Technology The Accelerator and Operations Technology (AOT) Division at Los Alamos National Laboratory conducts fundamental and applied research and development needed to improve operations and operations support for the Los Alamos Neutron Science Center (LANSCE). AOT's R&D efforts include

395

ACCELERATING POLARIZED PROTONS TO HIGH ENERGY.  

SciTech Connect

The Relativistic Heavy Ion Collider (RHIC) is designed to provide collisions of high energy polarized protons for the quest of understanding the proton spin structure. Polarized proton collisions at a beam energy of 100 GeV have been achieved in RHIC since 2001. Recently, polarized proton beam was accelerated to 250 GeV in RHIC for the first time. Unlike accelerating unpolarized protons, the challenge for achieving high energy polarized protons is to fight the various mechanisms in an accelerator that can lead to partial or total polarization loss due to the interaction of the spin vector with the magnetic fields. We report on the progress of the RHIC polarized proton program. We also present the strategies of how to preserve the polarization through the entire acceleration chain, i.e. a 200 MeV linear accelerator, the Booster, the AGS and RHIC.

BAI, M.; AHRENS, L.; ALEKSEEV, I.G.; ALESSI, J.; BEEBE-WANG, J.; BLASKIEWICZ, M.; BRAVAR, A.; BRENNAN, J.M.; BRUNO, D.; BUNCE, G.; ET AL.

2006-10-02T23:59:59.000Z

396

Proposed research on advanced accelerator concepts  

Science Conference Proceedings (OSTI)

This report summarizes technical progress and accomplishments during the proposed three-year research on advanced accelerator concepts supported by the Department of Energy under Contract No. DE-FG02-88ER40465. A vigorous theoretical program has been pursued in critical problem areas related to advanced accelerator concepts and the basic equilibrium, stability, and radiation properties of intense charged particle beams. Broadly speaking, our research has made significant contributions in the following three major areas: Investigations of physics issues related to particle acceleration including two-beam accelerators and cyclotron resonance laser (CRL) accelerators; Investigations of RF sources including the free- electron lasers, cyclotron resonance masers, and relativistic magnetrons; Studies of coherent structures in electron plasmas and beams ranging from a low-density, nonrelativistic, pure electron plasma column to high-density, relativistic, non-neutral electron flow in a high-voltage diode. The remainder of this report presents theoretical and computational advances in these areas.

Davidson, R.C.; Wurtele, J.S.

1991-09-01T23:59:59.000Z

397

Overview of SNS accelerator shielding analyses  

Science Conference Proceedings (OSTI)

The Spallation Neutron Source is an accelerator driven neutron scattering facility for materials research. During all phases of SNS development, including design, construction, commissioning and operation, extensive neutronics work was performed in order to provide adequate shielding, to assure safe facility operation from radiation protection point of view, and to optimize performance of the accelerator and target facility. Presently, most of the shielding work is concentrated on the beam lines and instrument enclosures to prepare for commissioning, safe operation and adequate radiation background in the future. Although the accelerator is built and in operation mode, there is extensive demand for shielding and activation analyses. It includes redesigning some parts of the facility, facility upgrades, designing additional structures, storage and transport containers for accelerator structures taken out of service, and performing radiation protection analyses and studies on residual dose rates inside the accelerator. (authors)

Popova, I.; Gallmeier, F. X.; Ferguson, P.; Iverson, E.; Lu, W. [ORNL/SNS, MS6475, PO Box 2008, Oak Ridge, TN 37831-6471 (United States)

2012-07-01T23:59:59.000Z

398

Site Manager Kansas City Site Office  

National Nuclear Security Administration (NNSA)

Kansas City Site Office (KCSO) Workforce Diversity FY 2010 NNSA Service Center EEO and Diversity Program Office PO Box 5400 Albuquerque, NM 87185 (505) 845-5517 TTY (800)...

399

PGI Accelerator Compilers - Aug 2009  

NLE Websites -- All DOE Office Websites (Extended Search)

PGI PGI ® 2010 Compilers & Tools Dave Norton Dave.norton@pgroup.com www.pgroup.com NERSC/OLCF/NICS Cray XT5 Workshop Lawrence Berkeley National Lab February 2010 Craig Toepfer Craig.toepfer@pgroup.com www.pgroup.com HPC Hardware Trends Today: Clusters of Multicore x86 Tomorrow? Clusters of Multicore x86 + Accelerators Jun-93 Jun-94 Jun-95 Jun-96 Jun-97 Jun-98 Jun-99 Jun-00 Jun-01 Jun-02 Jun-03 Jun-04 Jun-05 Jun-06 Jun-07 Jun-08 Jun-09 0.0% 10.0% 20.0% 30.0% 40.0% 50.0% 60.0% 70.0% 80.0% 90.0% 100.0% Custom RISC/UNIX Vector Itanium 64-bit x86 32-bit x86 Top 500 PGI Workstation / Server / CDK Linux, Windows, MacOS, 32-bit, 64-bit, Intel 64, AMD64 UNIX-heritage Command-level Compilers + Graphical Tools Compiler Language Command PGF95 (tm)

400

FY 2006 Control Table by Appropriation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Appropriation Appropriation (dollars in thousands - OMB Scoring) FY 2004 FY 2005 FY 2006 Comparable Comparable Request to FY 2006 vs. FY 2005 Approp Approp Congress Discretionary Summary By Appropriation Energy And Water Development Appropriation Summary: Energy Programs Energy supply.......................................................................... 794,897 932,319 902,674 -29,645 -3.2% Non-Defense site acceleration completion............................... 167,272 157,316 172,400 15,084 +9.6% Uranium enrichment D&D fund................................................ 414,027 495,015 591,498 96,483 +19.5% Non-Defense environmental services...................................... 307,795 288,966 177,534 -111,432 -38.6% Science.................................................................................... 3,536,373 3,599,546 3,462,718 -136,828 -3.8%

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Redesigned Web Sites  

NLE Websites -- All DOE Office Websites (Extended Search)

Redesigned Web Sites In an ongoing effort to improve services to our customers, the ORNL DAAC is pleased to announce that it has released a major revision to its Web site. The new...

402

Web Site Metadata  

E-Print Network (OSTI)

International World Wide Web Conference, pages 1123–1124,Erik Wilde. Site Metadata on the Web. In Proceedings of theUCB ISchool Report 2009-028 Web Site Metadata [4] David R.

Wilde, Erik; Roy, Anuradha

2009-01-01T23:59:59.000Z

403

SSA Fen Site  

NLE Websites -- All DOE Office Websites (Extended Search)

View an aerial photo-map of the SSA-Fen site. A general view of the Fen The flux tower at the Fen The huts at the Fen Pink flamingos, fen hens at the SSA-Fen site. Aerial...

404

Towoomba Site Image #1  

NLE Websites -- All DOE Office Websites (Extended Search)

Graphs Image TWM-1: General view of the Towoomba savanna grassland site, South Africa. (Photograph by Dr. R.J. Scholes, Forestek, CSIR, Pretoria, South Africa). Go to Site...

405

2012 Site Visit Manual  

Science Conference Proceedings (OSTI)

... before the first day on-site, all team members meet at their hotel to finalize ... All of the prework done above will save you much time and energy on-site ...

2012-09-04T23:59:59.000Z

406

ORNL Site Ofice  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ORNL Site Ofice ORNL Site Ofice P.O. Box 2008 Oak Ridge, Tennessee 37831-6269 January 28, 2013 MEMORANDUM FOR GREGORY H. WOODS GENERAL COUNSEL GC-1 FROM: SUBJECT: ��MK = MOORE, MANAGER lF �NL SITE OFFICE ANNUAL NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) PLANNING SUMMARY FOR 2013- OAK RIDGE NATIONAL LABORATORY (ORNL) SITE OFFICE (OSO) This correspondence transmits the Annual NEPA Planning Summary for 2013 for OSO.

407

Completed Sites Listing  

Energy.gov (U.S. Department of Energy (DOE))

As of fiscal year 2012, EM (and its predecessor organization UMTRA) completed cleanup and closed 90 sites in 24 states.

408

Idaho Site Nuclear Facilities  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Nuclear Facilities Idaho Idaho National Laboratorys (INL) Idaho Closure Project (ICP) This page was last updated on May 16...

409

High-power accelerator technology and requirements  

SciTech Connect

Designs of high-power proton linear accelerators (linacs) for accelerator transmutation of waste (ATW) are being actively studied at Los Alamos National Laboratory and at several other laboratories worldwide. Beam parameters cover the 100- to 300-mA range in average current and 800 to 1600 MeV in energy. While ideas for such accelerators have been discussed for decades, the technology base has recently advanced to the point that the feasibility of machines in the ATW power class is now generally conceded. Factors contributing to this advance have been the following: experience gained with medium-power research accelerators, especially the LAMPF linac at Los Alamos; major improvements in the theory and technology of high-intensity high-brightness accelerators fostered by the SDIO Neutral Particle Beam program; and development of high-power continuous-wave (cw) radio-frequency (rf) generators for high-energy colliding-beam rings. The reference ATW accelerator concept described in this paper is based on room-temperature copper accelerating cavities. Advances in superconducting niobium cavity technology have opened the possibility of application to ATW-type linacs. Useful efficiency gains could be realized, especially for lower current systems, and there may be technical advantages as well. Technology issues that need to be addressed for superconducting rf linac designs include the development of high-power rf couplers, appropriate cavity designs, and superconducting focusing elements, as well as concerns about beam damage of niobium structures and dynamic rf control with high beam currents.

Lawrence, G.P. (Los Alamos National Lab., NM (United States))

1993-01-01T23:59:59.000Z

410

Compact Dielectric Wall Accelerator Development For Intensity Modulated Proton Therapy And Homeland Security Applications  

Science Conference Proceedings (OSTI)

Compact dielectric wall (DWA) accelerator technology is being developed at the Lawrence Livermore National Laboratory. The DWA accelerator uses fast switched high voltage transmission lines to generate pulsed electric fields on the inside of a high gradient insulating (HGI) acceleration tube. Its high electric field gradients are achieved by the use of alternating insulators and conductors and short pulse times. The DWA concept can be applied to accelerate charge particle beams with any charge to mass ratio and energy. Based on the DWA system, a novel compact proton therapy accelerator is being developed. This proton therapy system will produce individual pulses that can be varied in intensity, energy and spot width. The system will be capable of being sited in a conventional linac vault and provide intensity modulated rotational therapy. The status of the developmental new technologies that make the compact system possible will be reviewed. These include, high gradient vacuum insulators, solid dielectric materials, SiC photoconductive switches and compact proton sources. Applications of the DWA accelerator to problems in homeland security will also be discussed.

Chen, Y -; Caporaso, G J; Guethlein, G; Sampayan, S; Akana, G; Anaya, R; Blackfield, D; Cook, E; Falabella, S; Gower, E; Harris, J; Hawkins, S; Hickman, B; Holmes, C; Horner, A; Nelson, S; Paul, A; Pearson, D; Poole, B; Richardson, R; Sanders, D; Stanley, J; Sullivan, J; Wang, L; Watson, J; Weir, J

2009-06-17T23:59:59.000Z

411

Accelerate Oklahoma (Oklahoma) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerate Oklahoma (Oklahoma) Accelerate Oklahoma (Oklahoma) Accelerate Oklahoma (Oklahoma) < Back Eligibility Agricultural Commercial Construction Developer Fuel Distributor General Public/Consumer Industrial Installer/Contractor Institutional Low-Income Residential Multi-Family Residential Retail Supplier Systems Integrator Transportation Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Water Home Weatherization Solar Wind Program Info State Oklahoma Program Type Equity Investment Provider i2E Three new funds that each offer equity and growth investment capital for state-based entrepreneurs, depending on the lifecycle stage of their business, were appropriated through the Oklahoma Commerce Department by the U.S. Treasury Department and are managed by i2E.

412

Polarized proton acceleration program at the AGS  

SciTech Connect

The unexpected importance of high energy spin effects and the success of the ZGS in correcting many intrinsic and imperfection depolarizing resonances led us to attempt to accelerate polarized protons in the AGS. A multi-university/laboratory collaborative effort involving Argonne, Brookhaven, Michigan, Rice and Yale is underway to improve and modify to accelerate polarized protons. From the experience at the ZGS and careful studies made us confident of the feasibility of achieving a polarization of over 60 percent up to 26 GeV/c with an intensity of 10/sup 11/ approx. 10/sup 12/ per pulse. The first polarized proton acceleration at the AGS is expected in 1983.

Lee, Y.Y.

1981-01-01T23:59:59.000Z

413

TWO-CHANNEL DIELECTRIC WAKE FIELD ACCELERATOR  

SciTech Connect

Experimental results are reported for test beam acceleration and deflection in a two-channel, cm-scale, rectangular dielectric-lined wakefield accelerator structure energized by a 14-MeV drive beam. The dominant waveguide mode of the structure is at {approx}30 GHz, and the structure is configured to exhibit a high transformer ratio ({approx}12:1). Accelerated bunches in the narrow secondary channel of the structure are continuously energized via Cherenkov radiation that is emitted by a drive bunch moving in the wider primary channel. Observed energy gains and losses, transverse deflections, and changes in the test bunch charge distribution compare favorably with predictions of theory.

Jay L. Hirshfield

2012-05-30T23:59:59.000Z

414

Measurement and correction of accelerator optics  

SciTech Connect

This report reviews procedures and techniques for measuring, correcting and controlling various optics parameters of an accelerator, including the betatron tune, beta function, betatron coupling, dispersion, chromaticity, momentum compaction factor, and beam orbit. The techniques described are not only indispensable for the basic set-up of an accelerator, but in addition the same methods can be used to study more esoteric questions as, for instance, dynamic aperture limitations or wakefield effects. The different procedures are illustrated by examples from several accelerators, storage rings, as well as linacs and transport lines.

Zimmerman, F.

1998-06-01T23:59:59.000Z

415

Ultra Accelerated Testing of PV Module Components  

DOE Green Energy (OSTI)

Using concentrated natural sunlight at the NREL High Flux Solar Furnace, we have exposed several materials to acceleration factors of up to 400 times the normal outdoor UV exposure dose. This accelerated rate allows the exposure of materials such that a year of outdoor exposure can be simulated in about 5 hours. We have studied the solarization of cerium containing glass, the degradation of ethylene vinyl acetate laminated between borosilicate glass, and the yellowing of standard polystyrene test coupons. The first two candidates are of interest to the photovoltaics (PV) program, and the last candidate material is a widely used dosimeter for ultra violet (UV) exposure in accelerated weathering chambers

Pitts, J. R.; King, D. E.; Bingham, C.; Czanderna, A. W.

1998-10-28T23:59:59.000Z

416

Cosmic acceleration and Brans-Dicke theory  

SciTech Connect

We study the accelerated expansion of the universe by exploring the Brans-Dicke parameter in different eras. For this, we take the FRW universe model with a viscous fluid (without potential) and the Bianchi type-I universe model with a barotropic fluid (with and without a potential). We evaluate the deceleration parameter and the Brans-Dicke parameter to explore cosmic acceleration. It is concluded that accelerated expansion of the universe can also be achieved for higher values of the Brans-Dicke parameter in some cases.

Sharif, M., E-mail: msharif.math@pu.edu.pk; Waheed, S. [University of the Punjab, Department of Mathematics (Pakistan)

2012-10-15T23:59:59.000Z

417

Kwok Ko SLAC National Accelerator Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Kwok Ko Kwok Ko SLAC National Accelerator Laboratory Work supported by US DOE Offices of HEP, ASCR and BES under contract AC02-76SF00515. Large Scale Computing and Storage Requirements for High Energy Physics Rockville, MD, November 27-28, 2012 Present and Future Computing Requirements for Advanced Modeling for Particle Accelerator 1. Advanced Modeling for Particle Accelerators (AMPA) NERSC Repositories: m349 Principal Investigator: K. Ko Senior Investigators: SLAC - L. Ge, Z. Li, C. Ng, L. Xiao, FNAL - A. Lunin, Jlab - H. Wang, BNL - S. Belomestnykh, ANL - A. Nassiri

418

DOE Site List  

Office of Environmental Management (EM)

Links Links Central Internet Database CID Photo Banner DOE Site List Site Geo Site Code State Operations Office1 DOE Programs Generating Streams at Site DOE Programs Managing Facilities Associated Data2 Acid/Pueblo Canyons ACPC NM Oak Ridge Waste/Media, Facilities Airport Substation CA Western Area Power Administration Facilities Akron Hill Communication Site CO Western Area Power Administration Facilities Akron Substation CO Western Area Power Administration Facilities AL Complex NM Albuquerque DP Facilities Alba Craft ALCL OH Oak Ridge Facilities Albany Research Center AMRC OR Oak Ridge Facilities Alcova Switchyard WY Western Area Power Administration Facilities Aliquippa Forge ALFO PA Oak Ridge Facilities

419

Site Environmental Report, 1993  

SciTech Connect

The Site Environmental Report (SER) is prepared annually in accordance with DOE Order 5400.1, ``General Environmental Protection Program.`` This 1993 SER provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA). For some readers, the highlights provided in the Executive Summary may provide sufficient information. Many readers, however, may wish to read more detailed descriptions of the information than those which are presented here.

Not Available

1994-06-01T23:59:59.000Z

420

Accelerating Clean-up at Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River More Documents & Publications Project NameDescription Slide...

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Jefferson Lab Guided Tour - What is an accelerator?  

NLE Websites -- All DOE Office Websites (Extended Search)

What is an accelerator? Welcome to Jefferson Lab Why was Jefferson Lab built? How do scientists study quarks? What is an accelerator? How does the accelerator work? Why use...

422

Jefferson Lab Guided Tour - How does the accelerator work?  

NLE Websites -- All DOE Office Websites (Extended Search)

How does the accelerator work? Welcome to Jefferson Lab Why was Jefferson Lab built? How do scientists study quarks? What is an accelerator? How does the accelerator work? Why use...

423

SLAC National Accelerator Laboratory - Staff Resources - Classic...  

NLE Websites -- All DOE Office Websites (Extended Search)

Resources page. Organization Safety Central Services Site Operations Policies and Procedures Badges and Site Visitors Professional Development and Training Computing Internal...

424

Potential Release Sites  

NLE Websites -- All DOE Office Websites (Extended Search)

PRS PRS Potential Release Sites Legacy sites where hazardous materials are found to be above acceptable levels are collectively called potential release sites. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Less than 10 percent of the total number of potential release sites need to go through the full corrective action process. What are potential release sites? Potential release sites are areas around the Laboratory and the town of Los Alamos at which hazardous materials from past activities have been found. Some examples of potential release sites include septic tanks and associated drain lines chemical storage areas wastewater outfalls material disposal areas incinerators sumps firing ranges

425

The Illinois Accelerator Research Center, or IARC, will  

NLE Websites -- All DOE Office Websites (Extended Search)

Illinois Accelerator Research Center, or IARC, will provide a state-of-the-art facility for accelerator research, education and industrialization. Scientists and engineers from...

426

Physics of Accelerators and Related Technology for International...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Physics of Accelerators and Related Technology for International Students (PARTI). Physics of Accelerators and Related Technology for International Students (PARTI). December 14,...

427

DOE Science Accelerator, Office of Scientific and Technical Informatio...  

Office of Scientific and Technical Information (OSTI)

Diffusion Links DOE Science Accelerator Booklet The DOE Science Accelerator Through innovation and research, OSTI is finding the fast lanes for knowledge diffusion to propel...

428

EA-1147: Low Energy Demonstration Accelerator Tech Area 53, Los...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

design, build, and test critical prototypical components of the accelerator system for tritium production, specifically the front-end low-energy section of the accelerator, at the...

429

Accelerator-Driven Transmutation Of Spent Fuel Elements  

NLE Websites -- All DOE Office Websites (Extended Search)

accelerator power, whereas neutron-efficient high temperature gas reactors (HTGRs) or CANDU reactors will require the smallest accelerator power, especially if thorium is...

430

Laser Plasma Particle Accelerators: Large Fields for Smaller Facility Sources  

E-Print Network (OSTI)

of high- gradient, laser plasma particle accelerators.particle accelerators, plasmas can sustain acceleratingthat use laser-driven plasma waves. These plasma- based

Geddes, Cameron G.R.

2010-01-01T23:59:59.000Z

431

Energy Department Announces Investments to Accelerate U.S. Manufacturi...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Investments to Accelerate U.S. Manufacturing of Energy Efficient Lighting Technologies Energy Department Announces Investments to Accelerate U.S. Manufacturing of Energy Efficient...

432

Department of Energy Awards $338 Million to Accelerate Domestic...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here Home Department of Energy Awards 338 Million to Accelerate Domestic Geothermal Energy Department of Energy Awards 338 Million to Accelerate Domestic Geothermal...

433

Energy Department Announces New Investments to Accelerate Breakthrough...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Investments to Accelerate Breakthroughs in Cost-Competitive Solar Energy Energy Department Announces New Investments to Accelerate Breakthroughs in Cost-Competitive Solar Energy...

434

Beam Test of a Tunable Dielectric Wakefield Accelerator  

NLE Websites -- All DOE Office Websites (Extended Search)

using the first tunable dielectric loaded accelerating structure. Dielectric-based accelerators are generally lacking in approaches to tune the frequency after fabrication....

435

SLAC National Accelerator Laboratory - Crowd-sourcing the Future...  

NLE Websites -- All DOE Office Websites (Extended Search)

Crowd-sourcing the Future of Accelerators By Janet Rae-Dupree January 12, 2012 Accelerator technology has made huge leaps forward, prompting important developments well beyond high...

436

SLAC National Accelerator Laboratory - SLAC Public Lecture: Particle...  

NLE Websites -- All DOE Office Websites (Extended Search)

Division will present a free public lecture, "Particle Accelerator on a Chip." Accelerators are huge and expensive, miles-long tubes that produce high-energy particles to...

437

Experiment on a Tunable Dielectric-Loaded Accelerating Structure  

NLE Websites -- All DOE Office Websites (Extended Search)

Proceedings of IPAC'10, Kyoto, Japan THPD068 03 Linear Colliders, Lepton Accelerators and New Acceleration Techniques A14 Advanced Concepts 4437 is connected to the...

438

Borland Awarded ACFA-IPAC'13 Prize for Accelerator Science  

NLE Websites -- All DOE Office Websites (Extended Search)

Argonne physicist Michael Borland has been awarded the Asian Committee for Future Accelerators ACFA-IPAC'13 Prize for recent, significant contribution to the field of accelerator...

439

SLAC National Accelerator Laboratory Our Vision. Our Mission...  

NLE Websites -- All DOE Office Websites (Extended Search)

National Accelerator Laboratory Our Vision. Our Mission. Our Values. SLAC National Accelerator Laboratory 2575 Sand Hill Road Menlo Park, CA 94025-7015 slac.stanford.edu Great...

440

The DOE Science Accelerator | OSTI, US Dept of Energy, Office...  

Office of Scientific and Technical Information (OSTI)

The DOE Science Accelerator Research Diffusion Links DOE Science Accelerator Booklet Through innovation and research, OSTI is finding the fast lanes for knowledge diffusion to...

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Analysis of Lipid OxidationChapter 9 Accelerated Stability Tests  

Science Conference Proceedings (OSTI)

Analysis of Lipid Oxidation Chapter 9 Accelerated Stability Tests Methods and Analyses eChapters Methods - Analyses Books Downloadable pdf of Chapter 9 Accelerated Stability Tests from ...

442

Search widget page for the Science Accelerator, Office of Scientific...  

NLE Websites -- All DOE Office Websites (Extended Search)

(DOEOSTI) by downloading the Science Accelerator widget. Use the widget to search, receive the RSS feed, and to access and manage Alerts. Get the Science Accelerator...

443

NERSC and CRD Help Decipher Science from Compact Accelerator...  

NLE Websites -- All DOE Office Websites (Extended Search)

and CRD Help Decipher Science from Compact Accelerator Simulations NERSC and CRD Help Decipher Science from Compact Accelerator Simulations May 26, 2009 3D Particle Surfing :...

444

Accelerated Aging of Roofing Surfaces | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerated Aging of Roofing Surfaces Accelerated Aging of Roofing Surfaces Emerging Technologies Project for the 2013 Building Technologies Office's Program Peer Review...

445

EA-1655: Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

655: Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition, Installation and Use for Research and Development EA-1655: Berkeley Lab Laser Accelerator (BELLA) Laser Acquisition,...

446

Electron acceleration & laser pulse compression using a laser...  

NLE Websites -- All DOE Office Websites (Extended Search)

acceleration & laser pulse compression using a laser-plasma accelerator Wednesday, August 14, 2013 - 3:00pm SLAC, Redtail Hawk Conference Room 108A Andreas Walker, Oxford...

447

Staging laser plasma accelerators for increased beam energy  

E-Print Network (OSTI)

Staging Laser Plasma Accelerators for Increased Beam Energy94720, USA Abstract. Staging laser plasma accelerators is anefficient way of mitigating laser pump depletion in laser

Panasenko, Dmitriy

2010-01-01T23:59:59.000Z

448

Laser Plasma Particle Accelerators: Large Fields for Smaller Facility Sources  

E-Print Network (OSTI)

of high- gradient, laser plasma particle accelerators.accelerators that use laser-driven plasma waves. Theseleft) showing the laser (red), plasma wake density (purple-

Geddes, Cameron G.R.

2010-01-01T23:59:59.000Z

449

Energy Department Accelerates the Deployment of Advanced Vehicle...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerates the Deployment of Advanced Vehicle Technologies with Private Industry Partnerships Energy Department Accelerates the Deployment of Advanced Vehicle Technologies with...

450

Accelerate Oklahoma (Oklahoma) | Open Energy Information  

Open Energy Info (EERE)

Accelerate Oklahoma (Oklahoma) Accelerate Oklahoma (Oklahoma) No revision has been approved for this page. It is currently under review by our subject matter experts. Jump to: navigation, search Last modified on August 29, 2013. EZFeed Policy Place Oklahoma Applies to States or Provinces Oklahoma Name Accelerate Oklahoma (Oklahoma) Policy Category Financial Incentive Policy Type Equity Investment Affected Technologies Biomass/Biogas, Coal with CCS, Concentrating Solar Power, Energy Storage, Fuel Cells, Geothermal Electric, Hydroelectric, Hydroelectric (Small), Natural Gas, Nuclear, Solar Photovoltaics, Wind energy Active Policy Yes Implementing Sector State/Province Primary Website http://www.i2e.org/access-to-capital/accelerate-oklahoma/ Summary Three new funds that each offer equity and growth investment capital for

451

From Autos to Accelerators | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

From Autos to Accelerators From Autos to Accelerators From Autos to Accelerators September 7, 2010 - 6:36pm Addthis Kathryn Grim Physicist Terry Grimm has a vision for Lansing, Michigan. In a town haunted by the remains of fallen automobile plants, his company and others like it are hiring workers to put their car-manufacturing skills toward building particle accelerators. "People question whether manufacturing is going to go away in this country," Grimm said. "That's not the case. There's enough high-tech industry that needs it. We need the same expertise that the auto industry required." Fermilab used funds from the American Recovery and Reinvestment Act to hire Grimm's company, Niowave Inc., to build superconducting radio-frequency cavities in cooperation with Indiana-based Roark Welding & Engineering Co.

452

2014 International Workshop on FFAG Accelerators  

NLE Websites -- All DOE Office Websites (Extended Search)

Brookhaven National Laboratory Brookhaven National Laboratory 2014 International Workshop on FFAG Accelerators (FFAG'14) Homepage Registration Talks Agenda Contact Us Workshop Information pulldown Accommodations Transportation to BNL Attendee Information Add Event to Calendar Access to BNL Directions to Event Food at BNL Local Weather at BNL Visiting BNL Nearby Attractions Disclaimer Welcome to FFAG'14 2014 International Workshop on FFAG Accelerators Registration will open on February 1, 2014. Motivation logo The past 15 years have seen a revival of interest in fixed field alternating gradient accelerators (FFAGs), which were first conceived of in the early 1950s. This revival began with proposals for their use for producing high intensity proton beams and muon colliders, and was followed by the construction and operation of a number of test accelerators. They

453

900-MHz NMR: Accelerating Scientific Discovery  

NLE Websites -- All DOE Office Websites (Extended Search)

00-MHz NMR: Accelerating Scientific 00-MHz NMR: Accelerating Scientific Discovery Scientific Innovation Through Integration 900-MHz NMR: Accelerating Scientific Discovery 900-MHz NMR: Accelerating Scientific Discovery Introduction When the U.S. Department of Energy's (DOE's) Office of Biological and Environmental Research approved the development and purchase of the world's first 900-MHz NMR (nuclear magnetic resonance) spectrometer in 1992, the highest magnetic field available was 750 MHz. DOE's decision and the ultimate success of its 900-MHz NMR spectrometer, which recently saw its five-year anniversary of operation at EMSL, catalyzed the development of a new generation of ultrahigh-field NMR spectrometers worldwide. Building new technology Building the magnet for the 900-MHz NMR spectrometer brought engineering challenges. Can the

454

SNS/BNL Accelerator Physics Group page  

NLE Websites -- All DOE Office Websites (Extended Search)

SNS/BNL Accelerator Systems group SNS/BNL Accelerator Systems group CA-Department Bldg 817 Upton, NY 11973, USA The Spallation Neutron Source project is a collaboration between six national laboratories of the United states to build a MegaWatt neutrons source driven by a proton accelerator. The complex is going to be build in Oak Ridge (Tennessee) and consists of a full energy (1GeV) linac, an accumulator ring and a mercury target with several instruments for neutron scattering. All the information in the project can be found here. At Brookhaven national laboratory we work mainly in the accumulator ring and transfer lines. Our group is part or the Collider Accelerator Division also in charge of RHIC and the AGS complex. If you are looking for information in a particular topic you can contact the persons working on

455

American Recovery and Reinvestment Act Accelerated Milestones  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

PROJECT OR PROJECT OR ACTIVITY / ACCELERATED MILESTONE TITLE MILESTONE DUE DATE EXPECTED ACCELERATED COMPLETION DATE WITH ARRA FUNDING STATUS INL - Cleanup of Surplus Nuclear Facilities -- CPP- 601 / 640 Complex D&D Post 2012 9/30/2011 On Schedule to be Met by Expected Accelerated Completion Date (NOTE: CPP-601 is approximately 2 months ahead of schedule, CPP-640 was completed by the end of April 2010). INL - Cleanup of Surplus Nuclear Facilities -- VCO Lines under TRA-632 building 9/30/2013 9/30/2011 On Schedule to be Met by Expected Accelerated Completion Date (NOTE: CERCLA Action Memorandum for TRA-632 Hot Cells D&D has been approved and decontamination work on Hot Cells is underway). Submit Corrective Action Unit 367 Corrective Action Investigation Plan

456

Slow Waveguide Structures for Particle Accelerators  

ORNL 2010-G00971/jcn UT-B ID 200802074 Slow Waveguide Structures for Particle Accelerators Technology Summary A waveguide design that can save time and money in the ...

457

Twisted waveguides for particle accelerator applications  

E-Print Network (OSTI)

A novel microwave device for accelerating charged particles based on twisted waveguide is presented. Twisted guides support slow-wave TM modes whose phase velocity could reach the speed of light c. The axial electric field ...

Wilson, Joshua L.

458

Accelerators and Other Sources for Radiation Chemistry  

NLE Websites -- All DOE Office Websites (Extended Search)

Accelerators and Other Sources for the Study of Radiation Chemistry James F. Wishart Adv. Chem. Ser. 254, Ch. 3, pp. 35-50 Abstract: This chapter is intended as a guide to aid in...

459

The evolution of high energy accelerators  

SciTech Connect

In this lecture I would like to trace how high energy particle accelerators have grown from tools used for esoteric small-scale experiments to gigantic projects being hotly debated in Congress as well as in the scientific community.

Courant, E.D.

1989-10-01T23:59:59.000Z

460

Designing and Running for High Accelerator Availability  

Science Conference Proceedings (OSTI)

The report provides an overview and examples of high availability design considerations and operational aspects making references to some of the available methods to assess and improve on accelerator reliability.

Willeke,F.

2009-05-04T23:59:59.000Z

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Chemistry Effects on Flow-Accelerated Corrosion  

Science Conference Proceedings (OSTI)

This report describes an investigation into the accuracy of the hydrazine and oxygen factors used for predicting flow-accelerated corrosion (FAC) in pressurized water reactors (PWRs) using the CHECWORKS Steam/Feedwater Application (SFA).

2005-11-07T23:59:59.000Z

462

Accelerating ray tracing using constrained tetrahedralizations  

Science Conference Proceedings (OSTI)

In this paper we introduce the constrained tetrahedralization as a new acceleration structure for ray tracing. A constrained tetrahedralization of a scene is a tetrahedralization that respects the faces of the scene geometry. The closest intersection ...

Ares Lagae; Philip Dutré

2008-06-01T23:59:59.000Z

463

Solid oxide materials research accelerated electrochemical testing  

DOE Green Energy (OSTI)

The objectives of this work were to develop methods for accelerated testing of cathode material for solid oxide fuel cells under selected operating conditions. The methods would be used to evaluate the performance of LSM cathode material.

Armstrong, T.R.; Windisch, C.; Arey, B.

1995-12-31T23:59:59.000Z

464

Reorientation of Hydrometeors in Aircraft Accelerated Flow  

Science Conference Proceedings (OSTI)

The drag force, instantaneous canting angle and response characteristics are discussed for large hydrometeors in horizontally accelerated airflow. Comparisons of calculated canting angles are made with data from an aircraft precipitation ...

K. V. Beard

1983-11-01T23:59:59.000Z

465

Relevance: The Fast Lane: Accelerator Kiosk  

NLE Websites -- All DOE Office Websites (Extended Search)

Relevance of the DVD "The Fast Lane: Accelerators at Fermilab" This DVD was published in early 2006. In mid-November 2009 the Large Hadron Collider at CERN in Geneva, Switzerland...

466

Analysis of Performance Accelerator Running ETMSP  

Science Conference Proceedings (OSTI)

This study investigates new approaches to parallel computer processing capable of accelerating certain classes of power system problems. The results show that a speedup of 30 times over conventional workstation computers is possible.

1993-11-01T23:59:59.000Z

467

SLAC National Accelerator Laboratory - Researchers Demonstrate...  

NLE Websites -- All DOE Office Websites (Extended Search)

in Nature by a team including scientists from the U.S. Department of Energy's (DOE) SLAC National Accelerator Laboratory and Stanford University. "We still have a number of...

468

SLAC National Accelerator Laboratory - Contact SLAC  

NLE Websites -- All DOE Office Websites (Extended Search)

Contact SLAC An aerial image of SLACs Accelerator, with a view of the highway and rest of the facility also. The SLAC campus is located on 426 acres of Stanford University...

469

SLAC National Accelerator Laboratory - Berkeley Lab Director...  

NLE Websites -- All DOE Office Websites (Extended Search)

to give a science talk as part of the commemoration of the 50th Anniversary of the SLAC National Accelerator Laboratory. In preparing for the talk, I took the opportunity to...

470

Science Accelerator Widget | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

widget allows users to search Science Accelerator, a gateway to science, including DOE R&D results, major R&D accomplishments, and recent research of interest to U.S. Department...

471

American Recovery and Reinvestment Act Accelerated Milestones  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7242012 September-11 On Schedule to be Met by Expected Accelerated Completion Date. Biology Complex D&D (scope does not include the main 9207 Biology building) -- WHP 2025...

472

Relativistic Fermi acceleration with shock compressed turbulence  

E-Print Network (OSTI)

This paper presents numerical simulations of test particle Fermi acceleration at relativistic shocks of Lorentz factor Gamma_sh = 2-60, using a realistic downstream magnetic structure obtained from the shock jump conditions. The upstream magnetic field is described as pure Kolmogorov turbulence; the corresponding downstream magnetic field lies predominantly in the plane tangential to the shock surface and the coherence length is smaller along the shock normal than in the tangential plane. Acceleration is nonetheless efficient and leads to powerlaw spectra with index s = 2.6-2.7 at large shock Lorentz factor Gamma_sh >> 1, markedly steeper than for isotropic scattering downstream. The acceleration timescale t_acc in the upstream rest frame becomes a fraction of Larmor time t_L in the ultra-relativistic limit, t_acc ~ 10 t_L/Gamma_sh. Astrophysical applications are discussed, in particular the acceleration in gamma-ray bursts internal and external shocks.

Martin Lemoine; Benoit Revenu

2005-10-18T23:59:59.000Z

473

Unique Aspects and Scientific Challenges - Electron Accelerator...  

Office of Science (SC) Website

Aspects and Scientific Challenges Cosmic Frontier Theoretical Physics Advanced Technology R&D Accelerator R&D Stewardship Research Highlights .pdf file (13.1MB) Questions for the...

474

SLAC National Accelerator Laboratory - Scientists Create First...  

NLE Websites -- All DOE Office Websites (Extended Search)

First Atomic X-ray Laser January 25, 2012 Menlo Park, Calif. - Scientists working at the U.S. Department of Energy's (DOE) SLAC National Accelerator Laboratory have created the...

475

SLAC National Accelerator Laboratory - SLAC Physicist Receives...  

NLE Websites -- All DOE Office Websites (Extended Search)

Receives Free-electron Laser Award By Glenn Roberts Jr. September 10, 2013 Dao Xiang, a SLAC accelerator physicist, has received an international award for his work on a technique...

476

Brookhaven National Laboratory | Accelerator Test Facility  

NLE Websites -- All DOE Office Websites (Extended Search)

for medical applications (Figure 1-49). Figure 1-49. Replacing gantry- type ion beam manipulator with a compact laser driven ion accelerator may enable compact and inexpensive...

477

HILBILAC development for accelerator?driven transmutation  

Science Conference Proceedings (OSTI)

High?Intensity Low?Beta Ion Linac (HILBILAC) is intended for acceleration of ion beams with current of about 1 A and higher. The CW HILBILAC with beam current of 250 mA is under development at MRTI. Concept of parameters choice is presented along with results of beam dynamics and resonator parameters calculations. A pulse prototype HILBILAC?TEST will have to be constructed and tested for the CW accelerator development

Vitaly Pirozhenko; Oleg Plink; HILBILAC Study Team

1995-01-01T23:59:59.000Z

478

Photonic laser-driven accelerator for GALAXIE  

SciTech Connect

We report on the design and development of an all-dielectric laser-driven accelerator to be used in the GALAXIE (GV-per-meter Acce Lerator And X-ray-source Integrated Experiment) project's compact free-electron laser. The approach of our working design is to construct eigenmodes, borrowing from the field of photonics, which yield the appropriate, highly demanding dynamics in a high-field, short wavelength accelerator. Topics discussed include transverse focusing, power coupling, bunching, and fabrication.

Naranjo, B.; Ho, M.; Hoang, P.; Putterman, S.; Valloni, A.; Rosenzweig, J. B. [UCLA Dept. of Physics and Astronomy Los Angeles, CA 90095-1547 (United States)

2012-12-21T23:59:59.000Z

479

Do Accelerating Turing Machines Compute the Uncomputable?  

Science Conference Proceedings (OSTI)

Accelerating Turing machines have attracted much attention in the last decade or so. They have been described as "the work-horse of hypercomputation" (Potgieter and Rosinger 2010: 853). But do they really compute beyond the "Turing limit"--e.g., compute ... Keywords: ATM paradox, Accelerating Turing machine, Epistemic embedding, External and internal computation, Halting problem, Hypercomputation, Ontology of computing, Supertask, Thompson lamp paradox, Turing-machine purism, Turing-machine realism

B. Jack Copeland; Oron Shagrir

2011-05-01T23:59:59.000Z

480

The Hamiltonian Mechanics of Stochastic Acceleration  

SciTech Connect

We show how to nd the physical Langevin equation describing the trajectories of particles un- dergoing collisionless stochastic acceleration. These stochastic di erential equations retain not only one-, but two-particle statistics, and inherit the Hamiltonian nature of the underlying microscopic equations. This opens the door to using stochastic variational integrators to perform simulations of stochastic interactions such as Fermi acceleration. We illustrate the theory by applying it to two example problems.

Burby, J. W.

2013-07-17T23:59:59.000Z

Note: This page contains sample records for the topic "non-defense site acceleration" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Annual Site Environmental Report: 2006  

SciTech Connect

This report provides information about environmental programs during the calendar year (CY) of 2006 at the Stanford Linear Accelerator Center (SLAC), Menlo Park, California. Activities that span the calendar year; i.e., stormwater monitoring covering the winter season of 2006/2007 (October 2006 through May 2007), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. SLAC continued to follow the path to self-declare an environmental management system under DOE Order 450.1, 'Environmental Protection Program' and effectively applied environmental management in meeting the site's integrated safety and environmental management system goals. For normal daily activities, all SLAC managers and supervisors are responsible for ensuring that proper procedures are followed so that Worker safety and health are protected; The environment is protected; and Compliance is ensured. Throughout 2006, SLAC focused on these activities through the SLAC management systems. These systems were also the way SLAC approached implementing 'greening of the government' initiatives such as Executive Order 13148. The management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. The SLAC Office of Assurance was created during 2006 in response to DOE Order 226.1. During 2006, there were no reportable releases to the environment from SLAC operations, and there were no Notice of Violations issued to SLAC from any of the regulatory agencies that oversee SLAC. In addition, many improvements in waste minimization, recycling, stormwater drain system, groundwater restoration, and SLAC's chemical management system (CMS) were continued during 2006 to better manage chemical use. Program-specific details are discussed below. SLAC operates its air quality management program in compliance with its established permit conditions. The Bay Area Air Quality Management District (BAAQMD) did not conduct a facility inspection of SLAC during 2006, though it did visit the site on four different occasions. The BAAQMD did compliment SLAC for the overall configuration of SLAC's gasoline dispensing facility and of SLAC's asbestos/demolition notification program during two of the visits. DOE awarded SLAC the 2006 Best in Class for Pollution Prevention and Environmental Stewardship Accomplishment in recognition of SLAC's CMS program which manages the procurement and use of chemicals. As an example of the efficiency of the CMS, SLAC reviewed its use of gases and associated tanks and phased out numerous gas tanks that were no longer needed or were not acceptable for long-term storage, in turn, reducing SLAC's on-site chemical inventory. As part of SLAC's waste minimization and management efforts, more than one thousand tons of municipal solid waste was recycled by SLAC during 2006. SLAC operates its industrial and sanitary wastewater management program in compliance with established permit conditions. During 2006, SLAC obtained a new facility-wide wastewater discharge permit which replaced four separate permits that were previously issued to SLAC. In 2006, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. The Environmental Restoration Program continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board or

Nuckolls, H.; /SLAC

2008-02-22T23:59:59.000Z

482

Siting Handbook WIND ENERGY SITING HANDBOOK  

E-Print Network (OSTI)

This Wind Energy Siting Handbook (the "Handbook") presents general information about regulatory and environmental issues associated with the development and siting of wind energy projects in the United States. It is intended to be a general guidance document providing technical information and tools for identifying potential issues that may arise with wind energy projects. The Handbook contains links to resources on the Internet. Those links are provided solely as aids to assist you in locating other Internet resources that may be of interest. They are not intended to state or imply that AWEA or the Contributors endorse, approve, sponsor, or are affiliated or associated with those linked sites. The Handbook is not intended as a comprehensive discussion of all wind energy project issues and should be used in conjunction with other available resources. The Handbook also is not intended as legal or environmental advice or as a best practices manual, nor should it be considered as such. Because the Handbook is only a general guidance document, independent legal counsel and/or environmental consulting services should be obtained to further explore any wind energy siting issue, matter, or project. In reviewing all or any part of the Handbook, you acknowledge and understand that the Handbook is only a general guidance document and does not constitute a best practices manual, legal or environmental advice, or a legal or other relationship with the American Wind Energy Association ("AWEA") or any of the persons or entities

unknown authors

2008-01-01T23:59:59.000Z

483

NETL: Site Environmental Quality  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Environmental Quality Site Environmental Quality About NETL Site Environmental Quality - Certified to ISO 14001:2004 Questions about NETL's Environment, Safety and Health Management System may be directed to Michael Monahan, 304-285-4408, michael.monahan@netl.doe.gov. NETL has implemented an Environment, Safety and Health (ES&H) Management System, based on DOE's Integrated Safety Management System, the International Organization for Standardization (ISO) 14000 series, and the Occupational Health and Safety Assessment (OHSAS) 18000 series. While the original scope of the ES&H Management System included the Morgantown and Pittsburgh sites, in fiscal year 2010, the Albany site was incorporated into the existing ES&H Management System. In addition, all three sites underwent ISO 14001:2004 recertification audits and Morgantown and

484

WCI | Site 300 CORS  

NLE Websites -- All DOE Office Websites (Extended Search)

: CORS : CORS Weather Site Access Contained Firing Facility (CFF) Continuosly Operating Reference Station (CORS) CORS logo How to access GPS satellite data The National Geodetic Survey(NGS) Home Page for the S300 CORS base station is: http://www.ngs.noaa.gov/CORS/ Type S300 into "enter SiteID" To get user-friendly data: http://www.ngs.noaa.gov/UFCORS/ The GPS data will be in "receiver independent exchange" (RINEX) format, version 2.10. CORS Proxy Data Availability Details: NGS Reference Position Information Site 300 CORS Reference Position RTK Transmission Frequency NGS s300 Site Log NGS s300 Site Map Links to other GPS sites Last modified: July 27, 2011 UCRL-MI-134143 | Privacy & Legal Notice Contact: wci-webteam@llnl.gov NNSA Logo DOE Logo

485

MONTICELLO NPL SITES  

Office of Legacy Management (LM)

.. ' \ MONTICELLO NPL SITES FFA QUARTERLY REPORT: October 1 -December 31, 2008 DOE Site Manager: Jalena Dayvault JR 7CJ7 This report summarizes current project status and activities implemented during October tiU'ough December 2008, and provides a schedule of planned near term activities for the Monticello MIII Tailings Site (MMTS) and the Monticello Vicinity Properties (MVP) NPL sites. This report also includes repository and Pond 4 leachate collection data, quarterly site inspection repmis, site meteorological data, and monitoring summary for tlw ex situ ground water treatment system. 1.0 MMTS Activities/Status Repository and Pond 4 · * Monthly and quarterly inspection of the repository identified no abnormalities (see attached repmis). .

486

ColumbusSites.cdr  

Office of Legacy Management (LM)

Columbus, Ohio, Sites consist of two geographically Columbus, Ohio, Sites consist of two geographically separate properties owned by the Battelle Memorial Institute: the King Avenue site, located in the city of Columbus, and the West Jefferson site, located approx- imately 15 miles west of Columbus. Battelle conducted extensive nuclear research at both locations for the U.S. Department of Energy (DOE) and its predecessor agencies between 1943 and 1986. The research resulted in contamination of soil, buildings, and equipment with radioactive and mixed waste materials. Environmental cleanup of the sites began in 1986. The 6-acre King Avenue site, which was historically a part of the federal government's fuel and target fab- rication program, consisted of 9 buildings and the surrounding grounds. Nuclear research conducted at the

487

Site environmental report summary  

Science Conference Proceedings (OSTI)

In this summary of the Fernald 1992 Site Environmental Report the authors will describe the impact of the Fernald site on man and the environment and provide results from the ongoing Environmental Monitoring Program. Also included is a summary of the data obtained from sampling conducted to determine if the site complies with DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA) requirements. These requirements are set to protect both man and the environment.

Not Available

1992-12-31T23:59:59.000Z

488

Nairobi Site Image #1  

NLE Websites -- All DOE Office Websites (Extended Search)

NRB-1: Canopy reflectance measurement within the Nairobi grassland site, Kenya. (Prof. Jenesio Kinyamario, University of Nairobi, is using a rednear-infrared spectral ratio meter....

489

CPER Site Image #1  

NLE Websites -- All DOE Office Websites (Extended Search)

CPR-1: Weather stationexclosure within the CPER grassland site, Colorado, USA. (Mark Lindquist, Colorado State University, is checking a wetdry deposition gauge. Photograph taken...

490

1994 Site environmental report  

Science Conference Proceedings (OSTI)

The Fernald site is a Department of Energy (DOE)-owned facility that produced high-quality uranium metals for military defense for nearly 40 years. DOE suspended production at the site in 1989 and formally ended production in 1991. Although production activities have ceased, the site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. The Site Environmental Report (SER) is prepared annually in accordance with DOE Order 5400.1, General Environmental Protection Program. This 1994 SER provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, U.S. Environmental Protection Agency (USEPA), and Ohio EPA (OEPA). For some readers, the highlights provided in this Executive Summary may provide sufficient information. Many readers, however, may wish to read more detailed descriptions of the information than those which are presented here. All information presented in this summary is discussed more fully in the main body of this report.

NONE

1995-07-01T23:59:59.000Z

491

Site Transition Guidance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Transition Guidance March 2010 Office of Environmental Management U.S. Department of Energy Washington D. C. 20585 Standard Review Plan (SRP) Technical Framework for EM...

492

Badkhyz Site Image #1  

NLE Websites -- All DOE Office Websites (Extended Search)

BDK-1: Experiment to study the effect of UV-b solar radiation on litter decomposition at the Badkhyz grassland site, Turkmenistan. (Prof. Leonid Rodin, Komarov Botanical Institute,...

493

historic site award  

Science Conference Proceedings (OSTI)

... Honors 'Historic Site' of NBS Physics Discovery. ... The American Physical Society (APS) has named ... revealed that in certain nuclear processes pairs ...

2011-11-16T23:59:59.000Z

494

RMOTC RMOTC -Site Map  

NLE Websites -- All DOE Office Websites (Extended Search)

Site Map Home About Us About Us Staff Field Info History Photo Gallery Awards & Testimonials Safety Initiatives Outreach & Community News Latest News Newsletters Press Releases...

495

2004 Environmental Site Report  

NLE Websites -- All DOE Office Websites (Extended Search)

phenolic compounds. Tests of underground coal gasification and tests of in-situ oil shale retorting resulted in contamination at these sites. The largest cleanup activity...

496

SITE LIGHTING FOUNDATIONS  

SciTech Connect

The purpose of this analysis is to design structural foundations for the Site Lighting. This analysis is in support of design drawing BABBDF000-01717-2100-23016.

M. Gomez

1995-01-17T23:59:59.000Z

497

Site Lead TQP Standard  

NLE Websites -- All DOE Office Websites (Extended Search)

Qualification Standard for the Office of Safety and Emergency Management Evaluations Site Lead Program May 2011 Office of Enforcement and Oversight Office of Health, Safety and...

498

2001 SITE ENVIRONMENTAL REPORT  

Science Conference Proceedings (OSTI)

THE SITE ENVIRONMENTAL REPORT FOR BROOKHAVEN NATIONAL LABORATORY FOR THE CALENDAR YEAR 2001, AS REQUIRED BY DOE ORDER 231.1.

BROOKHAVEN NATIONAL LABORATORY

2002-09-01T23:59:59.000Z

499

Site Environmental Report  

NLE Websites -- All DOE Office Websites (Extended Search)

30, 2003. However, seven SWMUs could not be remediated to No Further Action (NFA) status. The long- term monitoring of these inactive waste sites has been incorporated into...

500

Kursk Site Image #1  

NLE Websites -- All DOE Office Websites (Extended Search)

Graphs Image KRS-1: Clipping above-ground biomass at the Kursk grassland site, Russia. (Dr. Kira Khodashova and student Nina N., Moscow State University, are estimating monthly...