Powered by Deep Web Technologies
Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

The Office of Environmental Management Non-Defense Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Microsoft Word - PSRP Updates 6-25-10v2 The Office of Environmental Management (EM) Defense Environmental Cleanup The Office of Environmental Management Uranium Enrichment D&D...

2

Environmental Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Cleanup Environmental Cleanup Environmental Cleanup Learn more about the history, cleanup activities and possible future uses of the Hanford Site, a 586-square-mile government site in southeast Washington State. | Video courtesy of the Energy Department. The Energy Department is committed to a safe, complete cleanup of the environmental legacy of five decades of government-sponsored nuclear weapons development and nuclear energy research. As part of this mission, we safely and cost-effectively transport and dispose of low-level wastes; decommission and decontaminate old facilities; remediate contaminated soil and groundwater; and secure and store nuclear material in stable, secure locations to protect national security. Featured An Update on the Hanford Site and Cleanup Progress

3

ORNLIRASA-95117 LIFE SCIENCES DIVISION Environmental Restoration and Waste Management Non-Defense Programs  

Office of Legacy Management (LM)

95117 95117 LIFE SCIENCES DIVISION Environmental Restoration and Waste Management Non-Defense Programs (Activity No. EX 20 20 01 0; ADS1310AA) Results of the Independent Radiological Verification Survey at the Former Chapman Valve Manufacturing Company, Indian Orchard, Massachusetts (cIooo1v) R. E. Rodriguez and C. A. Johnson Date issued -May 1997 Investigation Team R. D. Foley-Measurement Applications and Development Manager M. E. Murray-FUSRAP Project Director R. E. Rodriguez-Field Survey Team Leader Survey Team Members R. C. Gosslee V. P. Patania R. E. Rodriguez Work performed by the Measurement Applications and Development Group Prepared by the OAK RIDGE NATIONAL LABORATORY Oak Ridge, Tennessee 37831-6285 managed by LOCKHEED MARTIN ENERGY RESEARCH CORP.

4

Environmental Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Cleanup Environmental Cleanup Environmental Cleanup August 23, 2013 EM Office of External Affairs Acting Communications Director Dave Borak talks with EM intern Valerie Edwards. | Photo courtesy of the Energy Department. Internships Help Future Energy Leaders Gain Hands-On Experience What's it like interning at the Energy Department? We interviewed one intern to find out. August 6, 2013 Oak Ridge National Laboratory The U.S. Department of Energy's (DOE) Oak Ridge National Laboratory (ORNL) is the nation's largest multi-program science and technology laboratory. ORNL's mission is to deliver scientific discoveries and technical breakthroughs that will accelerate the development and deployment of solutions in clean energy and global security. August 6, 2013 Y-12 National Security Complex

5

Protocol_for_Environmental_Management_Cleanup_Projects_(clean...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ProtocolforEnvironmentalManagementCleanupProjects(clean).pdf ProtocolforEnvironmentalManagementCleanupProjects(clean).pdf ProtocolforEnvironmentalManagementCleanup...

6

Environmental Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

August 19, 2010 August 19, 2010 Recovery Act Progress at Idaho National Lab North Wind Services will be constructing several new structures at the INL Radioactive Waste Management Complex -- facilities that will provide important protection from the elements and minimize the spread of contamination during buried waste excavation, retrieval and packaging operations. August 18, 2010 New Contract Helps Portsmouth GDP Cleanup To accelerate the Portsmouth GDP cleanup efforts left over from the Cold War, the Department of Energy made a huge step forward in our nuclear environmental cleanup efforts. August 13, 2010 Geek-Up: K East Reactor Demolition, Retrograde Melting and Cloud Pattern Tracking Recovery Act funds help clean up the Hanford site, retrograde melting (melting as something cools) and how open-cell clouds could help predict

7

Comprehensive Environmental Cleanup and Responsibility Act (Montana) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Comprehensive Environmental Cleanup and Responsibility Act Comprehensive Environmental Cleanup and Responsibility Act (Montana) Comprehensive Environmental Cleanup and Responsibility Act (Montana) < Back Eligibility Utility Fed. Government Commercial Agricultural Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Installer/Contractor Rural Electric Cooperative Tribal Government Institutional Fuel Distributor Savings Category Buying & Making Electricity Program Info State Montana Program Type Environmental Regulations Provider Montana Department of Environmental Quality The Comprehensive Environmental Cleanup and Responsibility Act contains general provisions (sections 705-729), along with the Voluntary Cleanup and Redevelopment Act (sections 730-738) and the Controlled Allocation of

8

Environmental Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

February 11, 2013 February 11, 2013 The Office of Nuclear Energy's mission is to advance nuclear power as a resource that can meet the United State's energy, environmental and national security needs. Office of Nuclear Energy Launches New Website A new website for NE means easier access to information and more up-to-date news for users. Check it out! January 30, 2013 Legacy Management Sites January 15, 2013 Secretary Chu, Governor Gregoire Issue Statement on Hanford Cleanup U.S. Energy Secretary Steven Chu and Governor Chris Gregoire issued a joint statement on the cleanup efforts underway at Hanford. December 21, 2012 The Rocky Flats Plant was first established in 1951 as a nuclear weapons manufacturing facility. Today, almost 4,000 acres make up the Rocky Flats National Wildlife Refuge. Located just 16 miles northwest of Denver, Colorado, the refuge provides a habitat for migratory birds and mammals. | Photo courtesy of the U.S. Department of Energy.

9

Monitoring Environmental Cleanup at Brookhaven National Lab  

NLE Websites -- All DOE Office Websites (Extended Search)

Compensation, and Liability Act environmental cleanup activities at Brookhaven National Laboratory comply with the Record of Decision (ROD) for each project. (A ROD...

10

Environmental Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 28, 2010 October 28, 2010 Obama Administration Hosts Great Lakes Offshore Wind Workshop in Chicago with Great Lakes Wind Collaborative WASHINGTON - The White House Council on Environmental Quality and the U.S. Department of Energy hosted a workshop with the Great Lakes Wind Collaborative in Chicago on October 26 - 27, 2010, focused on the siting of offshore wind power in the Great Lakes. The two day workshop brought together wind developers, Federal and state regulators, environmental advocates, and other regional stakeholders to discuss methods for ensuring greater clarity, certainty and coordination of Federal and state decision-making for offshore wind development in the Great Lakes. October 6, 2010 Agreement on New Commitments for Hanford Tank Waste Cleanup Sent to Federal

11

Environmental Cleanup, Brookhaven National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab campus Cleanup Project Details Groundwater Peconic River Surface and Soil Brookhaven Graphite Research Reactor High Flux Beam Reactor Brookhaven Medical Reactor...

12

Recovery Act Workers Complete Environmental Cleanup of Coal Ash...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Complete Environmental Cleanup of Coal Ash Basin Recovery Act Workers Complete Environmental Cleanup of Coal Ash Basin The Savannah River Site (SRS) recently cleaned up a 17-acre...

13

Recovery Act Workers Complete Environmental Cleanup of Coal Ash...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Workers Complete Environmental Cleanup of Coal Ash Basin Recovery Act Workers Complete Environmental Cleanup of Coal Ash Basin The Savannah River Site (SRS) recently cleaned up a...

14

Environmental Cleanup Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Environmental Cleanup Reports Environmental Cleanup Reports Environmental Cleanup Reports September 8, 2010 Audit Report: OAS-L-10-10 The Audit of Precious Metals at NNSA Sites August 12, 2010 Audit Letter Report: OAS-RA-L-10-05 Decommissioning and Demolition Activities at Office of Science Sites May 25, 2010 Audit Report: OAS-RA-10-10 Waste Processing and Recovery Act Acceleration Efforts for Contact-Handled Transuranic Waste at the Hanford Site May 3, 2010 Audit Report: OAS-L-10-04 The Interim Treatment of Salt Waste at the Savannah River Site April 23, 2010 Audit Letter Report: OAS-RA-L-10-03 Audit of Moab Mill Tailings Cleanup Project April 9, 2010 Audit Report: OAS-RA-10-07 Management Alert on Environmental Management's Select Strategy for Disposition of Savannah River Site Depleted Uranium Oxides

15

Lab completes record year for environmental cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

Record year for environmental cleanup Record year for environmental cleanup Lab completes record year for environmental cleanup Personnel conducted more field investigations and cleanup campaigns than ever and completed a record number of Lab shipments to WIPP. December 16, 2010 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials.

16

Environmental Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 28, 2009 July 28, 2009 800 to 1000 New Jobs Coming to Piketon Department of Energy to Accelerate Cleanup Work While USEC Further Develops ACP Technology April 22, 2009 Op-Ed by Secretary of Energy Steven Chu and Secretary of Labor Hilda Solis: Building the American Clean Energy Economy To commemorate Earth Day, the op-ed below on green jobs and energy independence by Secretaries Steven Chu and Hilda Solis ran in the following papers yesterday and today: Austin American-Statesman Buffalo News Denver Post Montgomery Advertiser Omaha World Herald Pittsburgh Post-Gazette April 22, 2009 US Department of Energy Promotes Special Earth Week Feature on Energy.gov Simple Steps Will Help Consumers Save Money -- and the Planet March 27, 2009 U.S. and Portugal Sign Agreement for Climate Research Collaboration

17

Materials for Nuclear Waste Disposal and Environmental Cleanup  

Science Conference Proceedings (OSTI)

Symposium, Materials for Nuclear Waste Disposal and Environmental Cleanup ... Secure and Certify Studies to Work on Production of Spiked Plutonium.

18

Environmental Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2, 2011 2, 2011 Vitrification technology -- immobilizing material in glass -- is a practical and effective option for treating radioactive and hazardous chemical wastes. | Image courtesy of PNNL A Roman Shipwreck and Safe Nuclear Storage Glass discovered in a Roman shipwreck could unlock more answers about how glass will stands the test of time for millennia to come -- research that is very relevant to vitrification, an effective method for storing nuclear waste in glass. September 2, 2011 EIS-0419: EPA Notice of Availability Whistling Ridge Energy Project Final Environmental Impact Statement DOE proposes to construct and operate a 75-megawatt Wind Turbine Facility in the City of White Salmon, Skamania County, WA. September 2, 2011 EA-1793: Draft Environmental Assessment

19

Environmental Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21, 2012 21, 2012 The 44-acre K-25 superstructure made significant historical contributions during its years of operation. | Photo credit Oak Ridge Office photographer Lynn Freeny. Commemorating the Historical Contributions of the K-25 Site in Tennessee A new project will turn the old K-25 site in Tennessee into a new industrial park for future economic development. September 13, 2012 The 200 West Groundwater Treatment Facility is shown here after completion of construction this summer. | Photo courtesy of Zachary Carter with Mission Support Alliance (MSA) at Hanford. The New Gold Standard: Environmental Management Introduces the First LEED Gold Industrial Facility The building's efficient design is expected to result in an energy cost savings of more than 70 percent over the life of the facility.

20

Lab receives an additional $19 million for environmental cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

Lab receives an additional $19 million for environmental cleanup Lab receives an additional $19 million for environmental cleanup Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit Lab receives an additional $19 million for environmental cleanup Lab also selects local businesses for five-year contracts June 1, 2013 Governor Susana Martinez visited the Lab in May to urge additional funding for cleanup Governor Susana Martinez visited the Lab in May to urge additional funding for cleanup Contact Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Thanks to support from New Mexico Senators Tom Udall and Martin Heinrich, Representatives Ben Ray Lujan and Steve Pearce and Governor Susana Martinez, the Lab has received an additional $19 million for environmental

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

UTILIZING THE RIGHT MIX OF ENVIRONMENTAL CLEANUP TECHNOLOGIES  

Science Conference Proceedings (OSTI)

The Savannah River Site (SRS) Figure 1 is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River near Aiken, South Carolina. During operations, which started in 1951, hazardous substances (chemicals and radionuclides) were released to the environment. The releases occurred as a result of inadvertent spills and waste disposal in unlined pits and basins which was common practice before environmental regulations existed. The hazardous substances have migrated to the vadose zone and groundwater in many areas of the SRS, resulting in 515 waste units that are required by environmental regulations, to undergo characterization and, if needed, remediation. In the initial years of the SRS environmental cleanup program (early 1990s), the focus was to use common technologies (such as pump and treat, air stripping, excavation and removal) that actively and tangibly removed contamination. Exclusive use of these technologies required continued and significant funding while often failing to meet acceptable clean-up goals and objectives. Recognizing that a more cost-effective approach was needed, SRS implemented new and complementary remediation methods focused on active and passive technologies targeted to solve specific remediation problems. Today, SRS uses technologies such as chemical/pH-adjusting injection, phytoremediation, underground cutoff walls, dynamic underground stripping, soil fracturing, microbial degradation, baroballs, electrical resistance heating, soil vapor extraction, and microblowers to more effectively treat contamination at lower costs. Additionally, SRS's remediation approach cost effectively maximizes cleanup as SRS works proactively with multiple regulatory agencies. Using GIS, video, animation, and graphics, SRS is able to provide an accurate depiction of the evolution of SRS groundwater and vadose zone cleanup activities to convince stakeholders and regulators of the effectiveness of various cleanup technologies. Remediating large, complex groundwater plumes using state of-the art technologies and approaches is a hallmark of years of experience and progress. Environmental restoration at SRS continues to be a challenging and dynamic process as new cleanup technologies and approaches are adopted.

Bergren, C; Wade Whitaker, W; Mary Flora, M

2007-05-25T23:59:59.000Z

22

Environmental Cleanup Best Management Practices: Effective Use of the Project  

E-Print Network (OSTI)

supports the use of best management practices (BMPs) * as a mechanism for maximizing technical effectiveness and resource efficiency in the execution of site assessment and cleanup projects. This fact sheet is the first in a series of documents that address conceptual site models (CSMs). A more comprehensive document is planned that will detail techniques to develop and maintain an accurate CSM as a primary planning and decision making tool used to identify and manage site uncertainty that can inhibit effective project decision making. This fact sheet summarizes how environmental practitioners can use CSMs to achieve, communicate, and maintain stakeholder consensus on site understanding, while satisfying the technical and

unknown authors

2011-01-01T23:59:59.000Z

23

Recovery Act Workers Complete Environmental Cleanup of Coal Ash Basin  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site (SRS) recently cleaned up a 17- Site (SRS) recently cleaned up a 17- acre basin containing coal ash residues from Cold War operations. The American Recovery and Reinvestment Act project was safely completed at a cost of $8.9 million, $2.9 million under budget. The manmade earthen basin received ash from the former R Area Pow- erhouse operations, which ended in 1964. The first of five reactors con- structed at SRS, the R Reactor produced nuclear materials for national defense. Recovery Act funding allowed SRS to accelerate cleanup of the basin and complete the project five years earlier than the target set in a regu- latory schedule. In late 2010, the U.S. Environmental Protection Agency and South Carolina Department of Health and Environmental Control determined the closure met all regulatory requirements after inspection

24

Technologies for environmental cleanup: Toxic and hazardous waste management  

SciTech Connect

This is the second in a series of EUROCOURSES conducted under the title, ``Technologies for Environmental Cleanup.`` To date, the series consist of the following courses: 1992, soils and groundwater; 1993, Toxic and Hazardous Waste Management. The 1993 course focuses on recent technological developments in the United States and Europe in the areas of waste management policies and regulations, characterization and monitoring of waste, waste minimization and recycling strategies, thermal treatment technologies, photolytic degradation processes, bioremediation processes, medical waste treatment, waste stabilization processes, catalytic organic destruction technologies, risk analyses, and data bases and information networks. It is intended that this course ill serve as a resource of state-of-the-art technologies and methodologies for the environmental protection manager involved in decisions concerning the management of toxic and hazardous waste.

Ragaini, R.C.

1993-12-01T23:59:59.000Z

25

An Act Relative to Environmental Cleanup and Promoting the Redevelopment of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

An Act Relative to Environmental Cleanup and Promoting the An Act Relative to Environmental Cleanup and Promoting the Redevelopment of Contaminated Property - The "Brownfields" Act (Massachusetts) An Act Relative to Environmental Cleanup and Promoting the Redevelopment of Contaminated Property - The "Brownfields" Act (Massachusetts) < Back Eligibility Construction Industrial Institutional Investor-Owned Utility Local Government Municipal/Public Utility Nonprofit Rural Electric Cooperative Tribal Government Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Home Weatherization Water Buying & Making Electricity Solar Wind Program Info State Massachusetts Program Type Corporate Tax Incentive Provider Mass. Department of Environmental Proection The Commonwealth of Massachusetts provides liability relief and financial

26

An Act Relative to Environmental Cleanup and Promoting the Redevelopme...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Massachusetts Program Type Corporate Tax Incentive Provider Mass. Department of Environmental Proection The Commonwealth of Massachusetts provides liability relief and...

27

Environmental cleanup of the Idaho National Laboratory status report  

SciTech Connect

On May 1, 2005 CH2M-WG Idaho LLC (CWI) began its 7-year, $2.4 billion cleanup of the Idaho National Laboratory Site (INL). When the work is completed in 2012, 3,406,871 liters (900,000 gallons) of sodium-bearing waste will have been treated; 15 high-level waste tanks will have been closed; more than 200 facilities will have been demolished or disposed of, including three reactors, several spent fuel basins, and hot cells; thousands of containers of buried transuranic waste will have been retrieved; more than 8,000 cubic meters (10,464 cubic yards) of contact-handled transuranic waste and more than 500 cubic meters (654 cubic yards) of remote-handled transuranic waste will have been characterized, packaged, and shipped offsite; almost 200 release sites and voluntary consent order tank systems will have been remediated; and 3,278 units of spent fuel will have been moved from wet to dry storage. Since assuming its responsibilities as the Idaho Cleanup Project contractor, CWI has completed its life-cycle project baseline, retrieved transuranic wastes from the pits within the Subsurface Disposal Area, disposed of special nuclear materials previously stored at the site, demolished several contaminated facilities, including the Loss-of-Fluid Test reactor complex at Test Area North, moved hundreds of spent fuel units from wet to safer, dry storage, completed grouting of a legacy spent fuel basin, disposed of tens of thousands of cubic meters of low-level wastes both onsite and offsite, closed several contaminated tank systems regulated by the State of Idaho, grouted several high-level waste tanks in preparation for RCRA closure, and made good progress in the design of the Integrated Waste Treatment Unit that will process 3,406,871 liters (900,000 gallons) of sodium-bearing waste in preparation for offsite disposal. Plans for 2007 are even more ambitious: the initiation of construction of the facility to treat sodium-bearing waste, continued removal of buried waste from a number of pits at the Subsurface Disposal Area, closure of additional high-level waste tanks, shipment of remote-handled transuranic waste to the Waste Isolation Pilot Plant, continuation of the onsite and offsite disposal of low-level radioactive wastes, decontamination and decommissioning of the Engineering Test Reactor at the Reactor Technology Complex, and remediation of RCRA-regulated tank systems and release sites. CWI continues to manage potential project challenges and risks associated with the construction of the sodium-bearing waste treatment facility, which is on the critical path for the project; achieving and sustaining necessary production levels in the retrieval of wastes from the Subsurface Disposal Area; and managing other potential project cost risk items. (authors)

Schubert, A.L. [CH2M.WG Idaho, LLC, Idaho Falls, Idaho (United States)

2007-07-01T23:59:59.000Z

28

UTILIZING INNOVATIVE TECHNOLOGIES FOR ENVIRONMENTAL CLEAN-UP, SAVAHHAH RIVER SITE  

SciTech Connect

The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River near Aiken, South Carolina. During operations, which started in 1951, hazardous substances (chemicals and radionuclides) were released to the environment. The releases occurred as a result of inadvertent spills and waste disposal in unlined pits and basins which was common practice before environmental regulations existed. The hazardous substances have migrated to the vadose zone and groundwater in many areas of the SRS, resulting in 515 waste units and facilities that are required by environmental regulations, to undergo characterization and, if needed, remediation. In the initial years of the SRS environmental cleanup program (early 1990s), the focus was to use common technologies (such as pump and treat, air stripping, excavation and removal) that actively and tangibly removed contamination. Exclusive use of these technologies required continued and significant funding while often failing to meet acceptable clean-up goals and objectives. Recognizing that a more cost-effective approach was needed, SRS implemented new and complementary remediation methods focused on active and passive technologies targeted to solve specific remediation problems. Today, SRS uses technologies such as chemical/pH-adjusting injection, phytoremediation, underground cutoff walls, dynamic underground stripping, soil fracturing, microbial degradation, baroballs, electrical resistance heating, soil vapor extraction, and microblowers to more effectively treat contamination at lower costs. Additionally, SRS's remediation approach cost effectively maximizes cleanup as SRS works proactively with multiple regulatory agencies. Using GIS, video, animation, and graphics, SRS is able to provide an accurate depiction of the evolution of SRS groundwater and vadose zone cleanup activities to convince stakeholders and regulators of the effectiveness of various cleanup technologies. Remediating large, complex groundwater plumes using state-of-the-art technologies and approaches is a hallmark of years of experience and progress. Environmental restoration at SRS continues to be a challenging and dynamic process as new cleanup technologies and approaches are adopted. technologies and approaches is a hallmark of years of experience and progress. Environmental restoration at SRS continues to be a challenging and dynamic process as new cleanup technologies and approaches are adopted.

Bergren, C

2009-01-07T23:59:59.000Z

29

This fact sheet describes the environmental cleanup activities the U.S. Departme  

Office of Legacy Management (LM)

environmental cleanup activities the U.S. Department of Energy Grand Junction Projects Office is environmental cleanup activities the U.S. Department of Energy Grand Junction Projects Office is conducting at the Monticello Mill Tailings Site in Monticello, Utah. These activities are being performed in accordance with Federal and State environmental laws. Background The original Monticello mill was built in 1942 to provide an additional supply of vanadium during World War II. Vanadium, an element used to strengthen steel, and uranium were milled intermittently until 1960. Mill tailings are sand-like material that remains after uranium has been extracted from the ore. Tailings contain naturally occurring materials that radioactively decay to radium and produce radon, a radioactive gas. If inhaled over a long period of time, particularly in enclosed areas,

30

Identification of radionuclides of concern in Hanford Site environmental cleanup  

Science Conference Proceedings (OSTI)

The purpose of this document is to consider which radionuclides should be included in conducting environmental surveys relative to site remediation at Hanford. During the operation of the Hanford site, the fission product radionuclides and a large number of activation products including the transuranic radionuclides were formed. The reactor operations and subsequent chemical processing and metallurgical operations resulted in the environmental release of gaseous and liquid effluents containing some radionuclides; however, the majority of the radionuclides were stored in waste tanks or disposed to trenches and cribs. Since some contamination of both soils and subsurface waters occurred, one must decide which radionuclides still remain in sufficient amounts to be of concern at the time when site remediation is to be complete. Many of the radionuclides which have constituted the principal hazard during site operation have half-lives on the order of a year or less; therefore, they will have decayed to insignificant amounts by the year 2030, a possible date for completion of the remediation process.

Perkins, R.W.; Jenquin, U.P.

1994-08-01T23:59:59.000Z

31

Management of Hanford Site non-defense production reactor spent nuclear fuel, Hanford Site, Richland, Washington  

SciTech Connect

The US Department of Energy (DOE) needs to provide radiologically, and industrially safe and cost-effective management of the non-defense production reactor spent nuclear fuel (SNF) at the Hanford Site. The proposed action would place the Hanford Site`s non-defense production reactor SNF in a radiologically- and industrially-safe, and passive storage condition pending final disposition. The proposed action would also reduce operational costs associated with storage of the non-defense production reactor SNF through consolidation of the SNF and through use of passive rather than active storage systems. Environmental, safety and health vulnerabilities associated with existing non-defense production reactor SNF storage facilities have been identified. DOE has determined that additional activities are required to consolidate non-defense production reactor SNF management activities at the Hanford Site, including cost-effective and safe interim storage, prior to final disposition, to enable deactivation of facilities where the SNF is now stored. Cost-effectiveness would be realized: through reduced operational costs associated with passive rather than active storage systems; removal of SNF from areas undergoing deactivation as part of the Hanford Site remediation effort; and eliminating the need to duplicate future transloading facilities at the 200 and 400 Areas. Radiologically- and industrially-safe storage would be enhanced through: (1) removal from aging facilities requiring substantial upgrades to continue safe storage; (2) utilization of passive rather than active storage systems for SNF; and (3) removal of SNF from some storage containers which have a limited remaining design life. No substantial increase in Hanford Site environmental impacts would be expected from the proposed action. Environmental impacts from postulated accident scenarios also were evaluated, and indicated that the risks associated with the proposed action would be small.

1997-03-01T23:59:59.000Z

32

The Environmental Management Core Laboratories - A Collaborative Effort to Enhance Cleanup  

SciTech Connect

Acknowledging that the magnitude and diversity of the critical issues facing the DOE-EM cannot be addressed by a single institution, the Laboratory Directors established the EM Core Laboratories. This collaborative network ensures that the best available resources are addressing environmental quality issues through the introduction of critical new science and technology. Based upon the Top-to-Bottom Review, the EM program is shifting the focus of its cleanup efforts to accelerate schedules to reduce cost and the most significant risks. To facilitate this acceleration, the Office of Science and Technology has restructured their research and development program towards two new thrusts. These thrusts, Closure Site Support and Alternative Development, are aimed at the high priority needs to support the re-baselined cleanup program. The EM Core Laboratories are well positioned to ensure the successful implementation of this new direction.

Birrer, S.A.; Frandsen, G.B.; Kearns, P.K.

2002-05-16T23:59:59.000Z

33

The Environmental Management Core Laboratories - A Collaborative Effort to Enhance Cleanup  

Science Conference Proceedings (OSTI)

Acknowledging that the magnitude and diversity of the critical issues facing the DOE-EM cannot be addressed by a single institution, the Laboratory Directors established the EM Core Laboratories. This collaborative network ensures that the best available resources are addressing environmental quality issues through the introduction of critical new science and technology. Based upon the Top-to-Bottom Review, the EM program is shifting the focus of its cleanup efforts to accelerate schedules to reduce cost and the most significant risks. To facilitate this acceleration, the Office of Science and Technology has restructured their research and development program towards two new thrusts. These thrusts, Closure Site Support and Alternative Development, are aimed at the high priority needs to support the re-baselined cleanup program. The EM Core Laboratories are well positioned to ensure the successful implementation of this new direction.

Birrer, Steve Allen; Griebenow, Bret Lee; Frandsen, Greg Bryan; Kearns, Paul Kenneth

2002-08-01T23:59:59.000Z

34

WIPP - CBFO Accelerating Cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

more information, access DOE Environmental Management site at: http:www.em.doe.govclosure For more information regarding the Accelerating Cleanup: Paths to Closure, contact...

35

Project Management Approach to Transition of the Miamisburg Closure Project From Environmental Cleanup to Post-Closure Operations  

SciTech Connect

The U.S. Department of Energy (DOE) used a project management approach to transition the Miamisburg Closure Project from cleanup by the Office of Environmental Management (EM) to post-closure operations by the Office of Legacy Management (LM). Two primary DOE orders were used to guide the site transition: DOE Order 430.1B, Real Property Asset Management, for assessment and disposition of real property assets and DOE Order 413.3, Program and Project Management for Acquisition of Capital Assets, for project closeout of environmental cleanup activities and project transition of post-closure activities. To effectively manage these multiple policy requirements, DOE chose to manage the Miamisburg Closure Project as a project under a cross-member transitional team using representatives from four principal organizations: DOE-LM, the LM contractor S.M. Stoller Corporation, DOE-EM, and the EM contractor CH2M Hill Mound Inc. The mission of LM is to manage the Department's post-transition responsibilities and long-term care of legacy liabilities and to ensure the future protection of human health and the environment for cleanup sites after the EM has completed its cleanup activities. (authors)

Carpenter, C.P. [U.S. Department of Energy, Office of Legacy Management Research Ridge 4, MS-K09, 3600 Collins Ferry Road, Morgantown, WV 26507 (United States); Marks, M.L.; Smiley, S.L. [U.S. Department of Energy, Office of Environmental Management, Chiquita Building, 250 E. 5th Street, Cincinnati, OH 45202 (United States); Gallaher, D.M.; Williams, K.D. [S.M. Stoller Corporation, 955 Mound Road, Miamisburg, Ohio 45342 (United States)

2006-07-01T23:59:59.000Z

36

THE ROLE OF LAND USE IN ENVIRONMENTAL DECISION MAKING AT THREE DOE MEGA-CLEANUP SITES FERNALD & ROCKY FLATS & MOUND  

SciTech Connect

This paper explores the role that future land use decisions have played in the establishment of cost-effective cleanup objectives and the setting of environmental media cleanup levels for the three major U.S. Department of Energy (DOE) sites for which cleanup has now been successfully completed: the Rocky Flats, Mound, and Fernald Closure Sites. At each site, there are distinct consensus-building histories throughout the following four phases: (1) the facility shut-down and site investigation phase, which took place at the completion of their Cold War nuclear-material production missions; (2) the decision-making phase, whereby stakeholder and regulatory-agency consensus was achieved for the future land-use-based environmental decisions confronting the sites; (3) the remedy selection phase, whereby appropriate remedial actions were identified to achieve the future land-use-based decisions; and (4) the implementation phase, whereby the selected remedial actions for these high-profile sites were implemented and successfully closed out. At each of the three projects, there were strained relationships and distrust between the local community and the DOE as a result of site contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholder groups - particularly in the role of final land use in the decision-making process, the site management teams at each respective site developed new public-participation strategies to open stakeholder communication channels with site leadership, technical staff, and the regulatory agencies. This action proved invaluable to the success of the projects and reaching consensus on appropriate levels of cleanup. With the implementation of the cleanup remedies now complete, each of the three DOE sites have become models for future environmental-remediation projects and associated decision making.

JEWETT MA

2011-01-14T23:59:59.000Z

37

Environmental Assessment for Cleanup and Closure of the Energy Technology Engineering Center  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

45 45 E E N N V V I I R R O O N N M M E E N N T T A A L L A A S S S S E E S S S S M M E E N N T T F F O O R R C C L L E E A A N N U U P P A A N N D D C C L L O O S S U U R R E E O O F F T T H H E E E E N N E E R R G G Y Y T T E E C C H H N N O O L L O O G G Y Y E E N N G G I I N N E E E E R R I I N N G G C C E E N N T T E E R R FINAL March 2003 U.S. Department of Energy NNSA Service Center Oakland, CA Environmental Assessment for Cleanup and Closure of the Energy Technology Engineering Center i TABLE OF CONTENTS Acronyms ..........................................................................................................................................v Glossary...........................................................................................................................................vi 1.0 INTRODUCTION ..................................................................................................................

38

Building organizational technical capabilities: a new approach to address the office of environmental management cleanup challenges in the 21. century  

Science Conference Proceedings (OSTI)

The United States Department of Energy (DOE), Office of Environmental Management (EM) is responsible for the nations nuclear weapons program legacy wastes cleanup. The EM cleanup efforts continue to progress, however the cleanup continues to be technologically complex, heavily regulated, long-term, and a high life cycle cost estimate (LCCE) effort. Over the past few years, the EM program has undergone several changes to accelerate its cleanup efforts with varying degrees of success. Several cleanup projects continued to experience schedule delays and cost growth. The schedule delays and cost growth have been attributed to several factors such as changes in technical scope, regulatory and safety considerations, inadequacy of acquisition approach and project management. This article will briefly review the background and schools of thought on strategic management and organizational change practiced in the United States over the last few decades to improve an organisation's competitive edge and cost performance. The article will briefly review examples such as the change at General Electric, and the recent experience obtained from the nuclear industry, namely the long-term response to the 1986 Chernobyl accident. The long-term response to Chernobyl, though not a case of organizational change, could provide some insight in the strategic management approaches used to address people issues. The article will discuss briefly EM attempts to accelerate cleanup over the past few years, and the subsequent paradigm shift. The paradigm shift targets enhancing and/or creating organizational capabilities to achieve cost savings. To improve its ability to address the 21. century environmental cleanup challenges and achieve cost savings, EM has initiated new corporate changes to develop new and enhance existing capabilities. These new and enhanced organizational capabilities include a renewed emphasis on basics, especially technical capabilities including safety, project management, acquisition management and people. The new enhanced organizational capabilities coupled with more effective communications; oversight and decision-making processes are expected to help EM meet the 21. century challenges. This article will focus on some of the initiatives to develop and enhance organizational technical capabilities. Some of these development initiatives are a part of DOE corporate actions to respond to the Defense Nuclear Facilities Safety Board (DNFSB) recommendations 93-3 and 2004-1. Other development initiatives have been tailored to meet EM specific needs for organizational capabilities such as case studies analysis and cost estimating. (authors)

Fiore, J.J.; Rizkalla, E.I. [Office of Environmental Management, The United States Dept. of Energy, Washington, D.C. (United States)

2007-07-01T23:59:59.000Z

39

Strategies for accelerating cleanup at toxic waste sites: Fast-tracking environmental actions and decision making  

Science Conference Proceedings (OSTI)

Presents truly innovative advances in investigative and cleanup technologies, offering valuable solutions that streamline the data collection process, speed up the time it takes to characterize a site, and expedite decision making.

Payne, S.M. [Tetra Tech EM Inc., Helena, MT (United States)

1998-12-31T23:59:59.000Z

40

Superfund accelerated cleanup model  

SciTech Connect

In an effort to speed and maximize cleanup of the worst sites first, the Environmental Protection Agency (EPA) developed the Superfund Accelerated Cleanup Model (SACM). SACM streamlines the Superfund process so hazardous waste sites can be addressed quicker and in a more cost effective manner. EPA Regional offices developed a number of pilot projects to test the principles of SACM. Although many pilots are underway in the Regions, the pilots described here involve four areas: accelerating cleanup through early actions; integrating site assessments; using Regional Decision Teams to establish priorities; and accelerating cleanup through the use of new technology.

Not Available

1994-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Cleanup Sites | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cleanup Sites Cleanup Sites Cleanup Sites Center Map As the largest environmental cleanup program in the world, EM has been charged with the responsibility of cleaning up 107 sites across the country whose area is equal to the combined area of Rhode Island and Delaware. EM has made substantial progress in nearly every area of nuclear waste cleanup and as of September 2012, completed cleanup at 90 of these sites. The "active" sites continue to have ongoing cleanup projects under EM's purview. Use the interactive map above to see states that still have cleanup activities associated with them. The tooltip in the upper-right corner shows site data for each state, and each marker gives site information as well as links to the site fact sheets here on the EM website and each site's full website.

42

Environmental cleanup privatization, products and services directory, January 1997. Second edition  

Science Conference Proceedings (OSTI)

The US Department of Energy has undertaken an ambitious ``Ten Year Plan`` for the Weapons Complex, an initiative to complete cleanup at most nuclear sites within a decade. This Second Edition of the Directory is designed to facilitate privatization which is key to the success of the Plan. The Directory is patterned after the telephone Yellow Pages. Like the Yellow Pages, it provides the user with points of contact for inquiring further into the capabilities of the listed companies. This edition retains the original format of three major sections under the broad headings: Treatment, Characterization, and Extraction/Deliver/Materials Handling. Within each section, companies are listed alphabetically. Also, ``company name`` and ``process type`` indices are provided at the beginning of each section to allow the user quick access to listings of particular interest.

NONE

1997-01-01T23:59:59.000Z

43

Science to support DOE site cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program awards. Fiscal year 1998 mid-year progress report  

SciTech Connect

Pacific Northwest National Laboratory was awarded ten (10) Environmental Management Science Program (EMSP) research grants in Fiscal Year 1996 and six (6) in Fiscal Year 1997. This section summarizes how each grant addresses significant US Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in four areas: Tank Waste Remediation, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Cleanup, and Health Effects.

NONE

1998-05-01T23:59:59.000Z

44

Remediation by inspiration : artist-driven models for environmental clean-up  

E-Print Network (OSTI)

While often seen as utilitarian and technical, environmental remediation efforts have significant cultural, social and physical impacts. Accordingly, they demand responses that utilize a multi-disciplinary approach to the ...

Fain, Jessica (Jessica Elizabeth)

2011-01-01T23:59:59.000Z

45

Warm Gas Cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

Warm Gas Cleanup Warm Gas Cleanup NETL Office of Research and Development Project Number: FWP-2012.03.03 Task 5 Project Description The Environmental Protection Agency (EPA) has established strict regulations for the trace contaminant emissions from integrated gasification combined cycle (IGCC) systems. The Department of Energy (DOE) performance goals for trace contaminant removal were selected to meet or exceed EPA's standard limits for contaminants, as well as to avoid poisoning of: the catalysts utilized in making liquids from fuel gas the electrodes in fuel cells selective catalytic reduction (SCR) catalysts The objective of the NETL's ORD Warm Gas Cleanup project is to assist in achieving both DOE and EPA targets for trace contaminant capture from coal gasification, while preserving the high thermal efficiency of the IGCC system. To achieve this, both lab and pilot-scale research is underway to develop sorbents capable of removing the following contaminants from high temperature syngas (up to 550°F):

46

Technology Development Advances EM Cleanup  

Energy.gov (U.S. Department of Energy (DOE))

The unique nature of many of EM's remaining facilities will require a strong and responsive engineering and technology program to improve work and public safety, and reduce costs and environmental impacts while completing the cleanup program.

47

Cleanup at Rocky Flats  

NLE Websites -- All DOE Office Websites (Extended Search)

David L. Clark, Los Alamos National Laboratory David L. Clark, Los Alamos National Laboratory The Rocky Flats Environmental Technology Site (RFETS) is an environmental cleanup site located about 16 miles northwest of downtown Denver (Fig 1). Two decades of routine monitoring have shown that the environment around RFETS is contaminated with actinide elements (U, Pu, Am) from site operations, [1] and RFETS has been designated by the U.S. Environmental Protection Agency (EPA) as a Superfund cleanup site. Until December 1989, the Rocky Flats Plant made components for nuclear weapons using various radioactive and hazardous materials, including plutonium, uranium and beryllium. Nearly 40 years of nuclear weapons production left behind a legacy of contaminated facilities, soils, and ground water. More than 2.5 million people live within a 50 mile radius of the site; 300,000 of those live in the Rocky Flats watershed.

48

Energy and environmental research emphasizing low-rank coal -- Task 3.10, Gas separation and hot-gas cleanup  

DOE Green Energy (OSTI)

Catalytic gasification of coal to produce H{sub 2}-, CO-, and CH{sub 4}-rich mixtures of gases for consumption in molten carbonate fuel cells is currently under development; however, to optimize the fuel cell performance and extend its operating life, it is desired to separate as much of the inert components (i.e., CO{sub 2} and N{sub 2}) and impurities (i.e., H{sub 2}S and NH{sub 3}) as possible from the fuel gas before it enters the fuel cell. In addition, the economics of the integrated gasification combined cycle (IGCC) can be improved by separating as much of the hydrogen as possible from the fuel, since hydrogen is a high-value product. Researchers at the Energy and Environmental Research Center (EERC) and Bend Research, Inc., investigated pressure-driven membranes as a method for accomplishing this gas separation and hot-gas cleanup. These membranes are operated at temperatures as high as 800 C and at pressures up to 300 psig. They have very small pore sizes that separate the undesirable gases by operating in the Knudsen diffusion region of mass transport or in the molecular sieving region of mass transport phenomena. In addition, H{sub 2} separation through a palladium metal membrane proceeds via a solution-diffusion mechanism for atomic hydrogen. This allows the membranes to exhibit extremely high selectivity for hydrogen separation. Specific questions to be answered in this project include: what are the effects of membrane properties (i.e., surface area, pore size, and coating thickness) on permeability and selectivity of the desired gases; what are the effects of operating conditions (i.e., temperature, pressure, and flow rate) on permeability and selectivity; what are the effects of impurities (i.e., small particulate, H{sub 2}S, HCl, NH{sub 3}, etc.) on membrane performance?

Swanson, M.L.

1995-08-01T23:59:59.000Z

49

Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards -- Fiscal Year 2002 Mid-Year Progress Report  

Science Conference Proceedings (OSTI)

Pacific Northwest National Laboratory has been awarded a total of 80 Environmental Management Science Program (EMSP) research grants since the inception of the program in 1996. The Laboratory has collaborated on an additional 14 EMSP awards with funding received through other institution. This report describes how each of the projects awarded in 1999, 2000, and 2001 addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in the individual project reports included in this document. Projects are under way in three main areas: Tank Waste Remediation, Decontamination and Decommissioning, and Soil and Groundwater Cleanup.

Bredt, Paul R.; Ainsworth, Calvin C.; Brockman, Fred J.; Camaioni, Donald M.; Egorov, Oleg B.; Felmy, Andrew R.; Gorby, Yuri A.; Grate, Jay W.; Greenwood, Margaret S.; Hay, Benjamin P.; Hess, Nancy J.; Hubler, Timothy L.; Icenhower, Jonathan P.; Mattigod, Shas V.; McGrail, B. Peter; Meyer, Philip D.; Murray, Christopher J.; Panetta, Paul D.; Pfund, David M.; Rai, Dhanpat; Su, Yali; Sundaram, S. K.; Weber, William J.; Zachara, John M.

2002-06-11T23:59:59.000Z

50

Environmental Cleanup and Remediation  

NLE Websites -- All DOE Office Websites (Extended Search)

monitor nuclear weapons.December 12, 2013 Los Alamos names four to Laboratory Fellows list New Fellows are Mark Chadwick, Cheryl Kuske, Geoff Reeves and Frank Pabian. December 10,...

51

Upper Los Alamos Canyon Cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

Upper Los Alamos Canyon Cleanup Upper Los Alamos Canyon Cleanup Upper Los Alamos Canyon Cleanup The Upper Los Alamos Canyon Project involves cleaning up hazardous materials left over from some of the Laboratory's earliest activities. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Located along Los Alamos Canyon from 7th Street to the Pajarito Ski Hill, the Upper Los Alamos Canyon Project involves examining sites in present and former Laboratory technical areas to see if any further environmental cleanup actions are needed. If not, the Laboratory can apply to have these sites removed permanently from LANL's Hazardous Waste Permit, meaning that no further actions are needed at those sites. Among the 115 sites included in the Upper LA Canyon Project, 54 have been

52

Science to Support DOE Site Cleanup: The Pacific Northwest National Laboratory Environmental Management Science Program Awards-Fiscal Year 1999 Mid-Year Progress Report  

Science Conference Proceedings (OSTI)

Pacific Northwest National Laboratory was awarded ten Environmental Management Science Program (EMSP) research grants in fiscal year 1996, six in fiscal year 1997, and eight in fiscal year 1998. This section summarizes how each grant addresses significant U.S. Department of Energy (DOE) cleanup issues, including those at the Hanford Site. The technical progress made to date in each of these research projects is addressed in more detail in the individual progress reports contained in this document. This research is focused primarily in five areas: Tank Waste Remediation, Decontamination and Decommissioning, Spent Nuclear Fuel and Nuclear Materials, Soil and Groundwater Clean Up, and Health Effects.

Peurrung, L.M.

1999-06-30T23:59:59.000Z

53

Accelerating cleanup: Paths to closure  

SciTech Connect

This report describes the status of Environmental Management`s (EM`s) cleanup program and a direction forward to complete achievement of the 2006 vision. Achieving the 2006 vision results in significant benefits related to accomplishing EM program objectives. As DOE sites accelerate cleanup activities, risks to public health, the environment, and worker safety and health are all reduced. Finding more efficient ways to conduct work can result in making compliance with applicable environmental requirements easier to achieve. Finally, as cleanup activities at sites are completed, the EM program can focus attention and resources on the small number of sites with more complex cleanup challenges. Chapter 1 describes the process by which this report has been developed and what it hopes to accomplish, its relationship to the EM decision-making process, and a general background of the EM mission and program. Chapter 2 describes how the site-by-site projections were constructed, and summarizes, for each of DOE`s 11 Operations/Field Offices, the projected costs and schedules for completing the cleanup mission. Chapter 3 presents summaries of the detailed cleanup projections from three of the 11 Operations/Field Offices: Rocky Flats (Colorado), Richland (Washington), and Savannah River (South Carolina). The remaining eight Operations/Field Office summaries are in Appendix E. Chapter 4 reviews the cost drivers, budgetary constraints, and performance enhancements underlying the detailed analysis of the 353 projects that comprise EM`s accelerated cleanup and closure effort. Chapter 5 describes a management system to support the EM program. Chapter 6 provides responses to the general comments received on the February draft of this document.

NONE

1998-06-01T23:59:59.000Z

54

Report to Congress on the U.S. Department of Energy`s Environmental Management Science Program: Research funded and its linkages to environmental cleanup problems, and Environmental Management Science Program research award abstracts. Volume 2 of 3 -- Appendix B  

Science Conference Proceedings (OSTI)

The Department of Energy`s Environmental Management Science Program (EMSP) serves as a catalyst for the application of scientific discoveries to the development and deployment of technologies that will lead to reduction of the costs and risks associated with cleaning up the nation`s nuclear complex. Appendix B provides details about each of the 202 research awards funded by the EMSP. This information may prove useful to researchers who are attempting to address the Department`s environmental management challenges in their work, program managers who are planning, integrating, and prioritizing Environmental Management projects, and stakeholders and regulators who are interested in the Department`s environmental challenges. The research award information is organized by the state and institution in which the lead principal investigator is located. In many cases, the lead principal investigator is one of several investigators at a number of different institutions. In these cases, the lead investigator (major collaborator) at each of the additional institutions is listed. Each research award abstract is followed by a list of high cost projects that can potentially be impacted by the research results. High cost projects are Environmental Management projects that have total costs greater than $50 million from the year 2007 and beyond, based on the March 1998 Accelerating Cleanup: Paths to Closure Draft data, and have costs or quantities of material associated with an Environmental Management problem area. High cost projects which must remain active in the year 2007 and beyond to manage high risk are also identified. Descriptions of these potentially related high cost Environmental Management projects can be found in Appendix C. Additional projects in the same problem area as a research award can be located using the Index of High Cost Environmental Management Projects by Problem Area, at the end of Appendices B and C.

NONE

1998-04-01T23:59:59.000Z

55

The Office of Environmental Management (EM) Defense Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

(EM) Defense Environmental Cleanup The Office of Environmental Management (EM) Defense Environmental Cleanup Microsoft Word - 271C2C7B.doc More Documents & Publications Microsoft...

56

Report to Congress on the U.S. Department of Energy`s Environmental Management Science Program: Research funded and its linkages to environmental cleanup problems. Volume 1 of 3 -- Report and Appendix A  

SciTech Connect

This report is submitted in response to a Congressional request and is intended to communicate the nature, content, goals, and accomplishments of the Environmental Management Science Program (EMSP) to interested and affected parties in the Department and its contractors, at Federal agencies, in the scientific community, and in the general public. The EMSP was started in response to a request to mount an effort in longer term basic science research to seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective. Section 1, ``Background of the Program,`` provides information on the evolution of the EMSP and how it is managed, and summarizes recent accomplishments. Section 2, ``Research Award Selection Process,`` provides an overview of the ongoing needs identification process, solicitation development, and application review for scientific merit and programmatic relevance. Section 3, ``Linkages to Environmental Cleanup Problems,`` provides an overview of the major interrelationships (linkages) among EMSP basic research awards, Environmental Management problem areas, and high cost projects. Section 4, ``Capitalizing on Science Investments,`` discusses the steps the EMSP plans to use to facilitate the application of research results in Environmental Management strategies through effective communication and collaboration. Appendix A contains four program notices published by the EMSP inviting applications for grants.

1998-04-01T23:59:59.000Z

57

HANFORD SITE CENTRAL PLATEAU CLEANUP COMPLETION STRATEGY  

SciTech Connect

Cleanup of the Hanford Site is a complex and challenging undertaking. The U.S. Department of Energy (DOE) has developed a comprehensive vision for completing Hanford's cleanup mission including transition to post-cleanup activities. This vision includes 3 principle components of cleanup: the {approx}200 square miles ofland adjacent to the Columbia River, known as the River Corridor; the 75 square miles of land in the center of the Hanford Site, where the majority of the reprocessing and waste management activities have occurred, known as the Central Plateau; and the stored reprocessing wastes in the Central Plateau, the Tank Wastes. Cleanup of the River Corridor is well underway and is progressing towards completion of most cleanup actions by 2015. Tank waste cleanup is progressing on a longer schedule due to the complexity of the mission, with construction of the largest nuclear construction project in the United States, the Waste Treatment Plant, over 50% complete. With the progress on the River Corridor and Tank Waste, it is time to place increased emphasis on moving forward with cleanup of the Central Plateau. Cleanup of the Hanford Site has been proceeding under a framework defmed in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In early 2009, the DOE, the State of Washington Department of Ecology, and the U.S. Environmental Protection Agency signed an Agreement in Principle in which the parties recognized the need to develop a more comprehensive strategy for cleanup of the Central Plateau. DOE agreed to develop a Central Plateau Cleanup Completion Strategy as a starting point for discussions. This DOE Strategy was the basis for negotiations between the Parties, discussions with the State of Oregon, the Hanford Advisory Board, and other Stakeholder groups (including open public meetings), and consultation with the Tribal Nations. The change packages to incorporate the Central Plateau Cleanup Completion Strategy were signed by the Parties on October 26,2010, and are now in the process of being implemented.

BERGMAN TB

2011-01-14T23:59:59.000Z

58

Gas stream cleanup  

Science Conference Proceedings (OSTI)

This report describes the current status and recent accomplishments of gas stream cleanup (GSCU) projects sponsored by the Morgantown Energy Technology Center (METC) of the US Department of Energy (DOE). The primary goal of the Gas Stream Cleanup Program is to develop contaminant control strategies that meet environmental regulations and protect equipment in advanced coal conversion systems. Contaminant control systems are being developed for integration into seven advanced coal conversion processes: Pressurized fludized-bed combustion (PFBC), Direct coal-fueled turbine (DCFT), Intergrated gasification combined-cycle (IGCC), Gasification/molten carbonate fuel cell (MCFC), Gasification/solid oxide fuel cell (SOFC), Coal-fueled diesel (CFD), and Mild gasification (MG). These advanced coal conversion systems present a significant challenge for development of contaminant control systems because they generate multi-contaminant gas streams at high-pressures and high temperatures. Each of the seven advanced coal conversion systems incorporates distinct contaminant control strategies because each has different contaminant tolerance limits and operating conditions. 59 refs., 17 figs., 5 tabs.

Bossart, S.J.; Cicero, D.C.; Zeh, C.M.; Bedick, R.C.

1990-08-01T23:59:59.000Z

59

EM Risk and Cleanup Decision Making Presentation by Mark Gilbertson...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AND CLEANUP DECISION MAKING www.em.doe.gov 1 Mark Gilbertson Deputy Assistant Secretary for Site Restoration Office of Environmental Management May 31, 2012 Presented to...

60

2003 U.S. Department of Energy Strategic Plan: Protecting National, Energy, and Economic Security with Advanced Science and Technology and Ensuring Environmental Cleanup  

SciTech Connect

The Department of Energy contributes to the future of the Nation by ensuring energy security, maintaining the safety, security and reliability of the nuclear weapons stockpile, cleaning up the environment from the legacy of the Cold War, and developing innovations in science and technology. After 25 years in existence, the Department now operates 24 preeminent research laboratories and facilities and four power marketing administrations, and manages the environmental cleanup from 50 years of nuclear defense activities that impacted two million acres in communities across the country. The Department has an annual budget of about $23 billion and employs about 14,500 Federal and 100,000 contractor employees. The Department of Energy is principally a national security agency and all of its missions flow from this core mission to support national security. That is true not just today, but throughout the history of the agency. The origins of the Department can be traced to the Manhattan Project and the race to develop the atomic bomb during World War II. Following the war, Congress engaged in a vigorous and contentious debate over civilian versus military control of the atom. The Atomic Energy Act of 1946 settled the debate by creating the Atomic Energy Commission, which took over the Manhattan Projects sprawling scientific and industrial complex.

None,

2003-09-30T23:59:59.000Z

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

HARVESTING EMSP RESEARCH RESULTS FOR WASTE CLEANUP  

Science Conference Proceedings (OSTI)

The extent of environmental contamination created by the nuclear weapons legacy combined with expensive, ineffective waste cleanup strategies at many U.S. Department of Energy (DOE) sites prompted Congress to pass the FY96 Energy and Water Development Appropriations Act, which directed the DOE to: ''provide sufficient attention and resources to longer-term basic science research, which needs to be done to ultimately reduce cleanup costs'', ''develop a program that takes advantage of laboratory and university expertise, and'' ''seek new and innovative cleanup methods to replace current conventional approaches which are often costly and ineffective.'' In response, the DOE initiated the Environmental Management Science Program (EMSP)-a targeted, long-term research program intended to produce solutions to DOE's most pressing environmental problems. EMSP funds basic research to lower cleanup cost and reduce risk to workers, the public, and the environment; direct the nation's scientific infrastructure towards cleanup of contaminated waste sites; and bridge the gap between fundamental research and technology development activities. EMSP research projects are competitively awarded based on the project's scientific, merit coupled with relevance to addressing DOE site needs. This paper describes selected EMSP research projects with long, mid, and short-term deployment potential and discusses the impacts, focus, and results of the research. Results of EMSP research are intended to accelerate cleanup schedules, reduce cost or risk for current baselines, provide alternatives for contingency planning, or provide solutions to problems where no solutions exist.

Guillen, Donna Post; Nielson, R. Bruce; Phillips, Ann Marie; Lebow, Scott

2003-02-27T23:59:59.000Z

62

Site Transition Process Upon Cleanup Completion | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion More...

63

Site Transition Process Upon Cleanup Completion | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup Completion Site Transition Process Upon Cleanup...

64

Accelerating cleanup: Paths to closure  

SciTech Connect

This document was previously referred to as the Draft 2006 Plan. As part of the DOE`s national strategy, the Richland Operations Office`s Paths to Closure summarizes an integrated path forward for environmental cleanup at the Hanford Site. The Hanford Site underwent a concerted effort between 1994 and 1996 to accelerate the cleanup of the Site. These efforts are reflected in the current Site Baseline. This document describes the current Site Baseline and suggests strategies for further improvements in scope, schedule and cost. The Environmental Management program decided to change the name of the draft strategy and the document describing it in response to a series of stakeholder concerns, including the practicality of achieving widespread cleanup by 2006. Also, EM was concerned that calling the document a plan could be misconstrued to be a proposal by DOE or a decision-making document. The change in name, however, does not diminish the 2006 vision. To that end, Paths to Closure retains a focus on 2006, which serves as a point in time around which objectives and goals are established.

Edwards, C.

1998-06-30T23:59:59.000Z

65

Environmental Sustainability Stories  

NLE Websites -- All DOE Office Websites (Extended Search)

Stories community-environmentassetsimagesiconearthday.jpg Environmental Stories Our environmental stewardship commitment: we will cleanup the past, minimize impacts for...

66

Department of Energy - Environmental Cleanup  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

71 en Internships Help Future Energy 71 en Internships Help Future Energy Leaders Gain Hands-On Experience http://energy.gov/articles/internships-help-future-energy-leaders-gain-hands-experience Internships Help Future Energy Leaders Gain Hands-On Experience

67

Environmental Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 10, 2011 May 10, 2011 Improved cookstove in village of Santa Cruz de Lanchi, installed through Peru's national cookstove program. | Photo credit: Ranyee Chiang, DOE Department of Energy Planning Cookstoves Research, Releases Biomass Technical Meeting Summary As awareness builds for clean-burning cookstoves in the developing world, the Department of Energy is working with other government agencies and NGOs to make stoves cleaner, more efficient and more affordable. March 16, 2011 Ener-G-Rotors' 5kW prototype system | courtesy of Ener-G-Rotors Turning Waste Heat into Power: Ener-G-Rotors and the Entrepreneurial Mentorship Program If you've ever driven by an industrial plant, you've probably noticed big white plumes rising from the tops of the facilities. While it might

68

Environmental Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

May 23, 2009 May 23, 2009 U.S. and Italy Sign Agreement to Collaborate on Carbon Capture and Storage Technologies ROME, ITALY - U.S. Energy Secretary Steven Chu today joined with Italian Minister of Economic Development Claudio Scajola to sign a bilateral agreement to advance carbon capture and storage (CCS) technologies in each country. Working together, the U.S. and Italy will further the development of technologies needed to limit carbon dioxide emissions from coal-fired powered plants and move toward a sustainable low carbon economy that addresses the challenge of global warming. May 15, 2009 Secretary Chu Announces $2.4 billion in Funding for Carbon Capture and Storage Projects Funds to Advance Research, Development and Deployment of Carbon Capture and Storage Technologies and Infrastructure

69

The Application of NEPA to CERCLA Cleanups | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Application of NEPA to CERCLA Cleanups The Application of NEPA to CERCLA Cleanups The Application of NEPA to CERCLA Cleanups On March 31, 1994, officials from the Departrnent of Energy (DOE), the Environmental Protection Agency (EPA), and the Council on Environmental Quality (CEQ) met with then Acting Assistant Attorney General Lois Schiffer and other representatives of the Department of Justice (DOJ) to discuss the issue of the relationship of the National Environmental Policy Act (NEPA) to the cleanup of federal facilities under the CERCLA Superfund program. The meeting focused on proposals for addressing problems that have arisen from DOE's attempts to integrate the procedural and analytical approaches of NEPA into the CERCLA cleanup process. This document describes what was discussed at the meeting and the consensus reached there.

70

The Application of NEPA to CERCLA Cleanups | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Application of NEPA to CERCLA Cleanups The Application of NEPA to CERCLA Cleanups The Application of NEPA to CERCLA Cleanups On March 31, 1994, officials from the Departrnent of Energy (DOE), the Environmental Protection Agency (EPA), and the Council on Environmental Quality (CEQ) met with then Acting Assistant Attorney General Lois Schiffer and other representatives of the Department of Justice (DOJ) to discuss the issue of the relationship of the National Environmental Policy Act (NEPA) to the cleanup of federal facilities under the CERCLA Superfund program. The meeting focused on proposals for addressing problems that have arisen from DOE's attempts to integrate the procedural and analytical approaches of NEPA into the CERCLA cleanup process. This document describes what was discussed at the meeting and the consensus reached there.

71

EM Highlights | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

accounts: Defense Environmental Cleanup, Non-Defensive Environmental Completion and Uranium Enrichment Decontamination and Decommissioning fund. The FY 2012 budget request...

72

Hazardous Sites Cleanup Act (Pennsylvania) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Hazardous Sites Cleanup Act (Pennsylvania) Hazardous Sites Cleanup Act (Pennsylvania) Hazardous Sites Cleanup Act (Pennsylvania) < Back Eligibility Agricultural Construction Fuel Distributor Industrial Investor-Owned Utility Municipal/Public Utility Rural Electric Cooperative Utility Program Info State Pennsylvania Program Type Environmental Regulations Grant Program Provider Department of Environmental Protection This Act tasks the Pennsylvania Department of Environmental Protection with regulating hazardous waste. The department is charged with siting, review, permitting and development of hazardous waste treatment and disposal facilities in order to protect public health and safety, foster economic growth and protect the environment. Pennsylvania law establishes a fund to provide to the Department the

73

Reactor water cleanup system  

DOE Patents (OSTI)

A reactor water cleanup system includes a reactor pressure vessel containing a reactor core submerged in reactor water. First and second parallel cleanup trains are provided for extracting portions of the reactor water from the pressure vessel, cleaning the extracted water, and returning the cleaned water to the pressure vessel. Each of the cleanup trains includes a heat exchanger for cooling the reactor water, and a cleaner for cleaning the cooled reactor water. A return line is disposed between the cleaner and the pressure vessel for channeling the cleaned water thereto in a first mode of operation. A portion of the cooled water is bypassed around the cleaner during a second mode of operation and returned through the pressure vessel for shutdown cooling.

Gluntz, Douglas M. (San Jose, CA); Taft, William E. (Los Gatos, CA)

1994-01-01T23:59:59.000Z

74

2013 Congressional Nuclear Cleanup Caucus Briefings | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2013 Congressional Nuclear Cleanup Caucus Briefings 2013 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of...

75

HANFORD SITE CLEANUP OBJECTIVES INCONSISTENTWITH PROJECTED LAND...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

HANFORD SITE CLEANUP OBJECTIVES INCONSISTENTWITH PROJECTED LAND USES, IG-0446 HANFORD SITE CLEANUP OBJECTIVES INCONSISTENTWITH PROJECTED LAND USES, IG-0446 The cleanup of the...

76

Idaho Cleanup Contractor Surpasses Significant Safety Milestones |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cleanup Contractor Surpasses Significant Safety Milestones Cleanup Contractor Surpasses Significant Safety Milestones Idaho Cleanup Contractor Surpasses Significant Safety Milestones April 29, 2013 - 12:00pm Addthis CWI employees discuss safety procedures before they remove a spent nuclear fuel shipment from a shipping container. CWI employees discuss safety procedures before they remove a spent nuclear fuel shipment from a shipping container. IDAHO FALLS, Idaho - For the second time in a little over a year, employees with DOE contractor CH2M-WG Idaho (CWI) supporting EM at the Idaho site have achieved 1 million hours without a recordable injury. They also worked more than 1.7 million hours without a lost work-time injury. "Our focus is working with employees to keep each other safe," said CWI Environmental, Safety, and Health Vice President Kevin Daniels. "We

77

Los Alamos National Laboratory names cleanup subcontractors  

NLE Websites -- All DOE Office Websites (Extended Search)

Cleanup subcontractors named Cleanup subcontractors named Los Alamos National Laboratory names cleanup subcontractors The three companies are Los Alamos Technical Associates (LATA), Portage Inc., and ARSEC Environmental, LLC (ARSEC). August 14, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma physics and new materials. Contact Fred deSousa

78

Getting reimbursed for UST cleanup  

Science Conference Proceedings (OSTI)

To accelerate the pace of underground storage tank (UST) cleanup, many states now have programs that reimburse UST owners for money spent on various phases of soil and groundwater remediation. Many other states are enacting these programs. At their best, these programs have provided an incentive for those who operate USTs of all sizes to report and clean up contamination problems. Many states were surprised at the numbers of UST owners who came forward. This was certainly the case in Florida. In 1987, Florida's Department of Environmental Regulation (DER), in order to obtain rapid disclosure and meet remediation of leaking USTs, developed its Early Detection Incentive (EDI) program, which is now becoming a model for other states. Two important provisions of the program are amnesty from prosecution for not having previously reported leaking tanks and nearly full funding from the state for tank removal and cleanup. Prior to EDI, less than 1,000 petroleum USTs had been reported. As of May 1992, the number had reached 9,444 - about five times more sites than had been anticipated. While EDI has removed the threat of prosecution by the state for non-disclosure of leaking tanks, it does not absolve the responsible parties from potential liabilities due to underground plumes of contamination migrating off-site onto other properties. If the responsible parties wan to take charge of their own cleanup projects, they must advance the money for each stage of the operation. The cost of assessment and remediation of these sites can amount to several hundred thousand dollars. Consequently, swift negotiation in receiving state agency approval for various remediation phases, as well as site closure, can significantly shorten the amount of time it takes to get reimbursement from the state. Therefore, there is considerable incentive for the responsible parties to get their sites cleaned up as quickly as possible.

Dunn, B. (Groundwater Technology, Inc., Tampa, FL (United States))

1993-04-01T23:59:59.000Z

79

EM's Indefinite Delivery/Indefinite Quantity Cleanup Contracts |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM's Indefinite Delivery/Indefinite Quantity Cleanup Contracts EM's Indefinite Delivery/Indefinite Quantity Cleanup Contracts EM's Indefinite Delivery/Indefinite Quantity Cleanup Contracts The Office of Environmental Management (EM) has 23 Indefinite Delivery/Indefinite Quantity (IDIQ) contracts to provide cleanup services at EM sites across the United States. The scope of work of the IDIQ contracts includes: environmental remediation deactivation, decommissioning, demolition and removal of contaminated facilities waste management regulatory compliance These nationwide, multiple-award IDIQ contracts allow EM sites to place timely, competitive and cost-effective task orders for environmental services with either large or small businesses, as determined by the complexity of the requirements. Twelve of the IDIQ contracts were awarded

80

Final Rocky Flats Cleanup Agreement, July 19, 1996 Summary  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Cleanup Agreement Rocky Flats Cleanup Agreement State Colorado Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA/RCRA Scope Summary Establish the regulatory framework for achieving the ultimate cleanup of the Rocky Flats Site. Parties DOE; US EPA; The State of Colorado Date 7/19/1996 SCOPE * Establish the regulatory framework for achieving the ultimate cleanup of the Rocky Flats Site. * Ensure that the environmental impacts associated with activities at the Site will continue to be investigated and that appropriate response actions are taken. * Establish a procedural framework and schedule for developing, implementing, and monitoring appropriate response actions at the site. * Coordinate all of DOE's cleanup obligations under CERCLA, RCRA, and the Colorado

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Secretary Chu Highlights Recovery Act Cleanup Progress | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Highlights Recovery Act Cleanup Progress Highlights Recovery Act Cleanup Progress Secretary Chu Highlights Recovery Act Cleanup Progress March 23, 2010 - 12:00am Addthis OAK RIDGE, TENN. - Energy Secretary Steven Chu announced today that the Department's Environmental Management program has spent more than $1.5 billion in American Recovery and Reinvestment Act funds on cleanup projects around the country - 25 percent of the program's total - creating an estimated 14,400 jobs since the start of the Recovery Act. "Because of the Recovery Act, programs around the country have been able to expand, hire and continue our important cleanup work," said Secretary Chu. "These investments have played a key role in helping local economies recover, creating jobs and supporting small businesses in dozens of

82

IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER June 29, 2011 - 12:00pm Addthis Media Contact Brad Bugger (208) 526-0833 Idaho Falls, ID - The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Cooper has more than 30 years of experience in commercial and government engineering and management, including an eight month stint as acting Deputy Manager for EM. He has extensive experience in business management associated with program planning, development and administration. His experience includes all project phases from conceptual planning, cost and

83

EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract EM, UCOR Quickly Reconcile Oak Ridge Cleanup Contract July 12, 2012 - 12:00pm Addthis DOE and UCOR employees held an event today celebrating the recent contract reconciliation. DOE and UCOR employees held an event today celebrating the recent contract reconciliation. OAK RIDGE, Tenn. - At a ceremony today, Oak Ridge's Environmental Management (EM) program and its prime contractor, URS | CH2M Oak Ridge, LLC (UCOR) celebrated the completion of the site's reconciled cleanup contract. The newly aligned contract accurately specifies the projects and activities that the site's cleanup contractor will perform. "The speedy completion of this process is a testament to DOE and UCOR contract teams and managers," said Sue Cange, acting manager of the Oak

84

Colorado and the Accelerated Cleanup at Rocky Flats  

SciTech Connect

When the Rocky Flats closure project was declared complete in October 2005, it was the largest environmental cleanup to date. Even more impressive, it was ahead of schedule and well under budget. Several factors combined to produce this success including a performance-based contract with financial incentives, development and application of innovative technologies, and a regulator-backed accelerated approach to the cleanup process. The factor in this success in which the State of Colorado had the largest role was in developing and enforcing the Rocky Flats Cleanup Agreement. In compliance with this agreement, cleanup was accomplished by means of multiple interim actions that led to a comprehensive final decision at the end. A key element that allowed the accelerated cleanup was constant consultation among DOE, its contractor, and the regulators plus collaboration with stakeholders. (authors)

Spreng, C. [Public Health and Environment, Colorado Dept., Denver, CO (United States)

2007-07-01T23:59:59.000Z

85

WIPP Accelerating Cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

ACCELERATING CLEANUP: ACCELERATING CLEANUP: PATHS TO CLOSURE CARLSBAD AREA OFFICE JUNE 1998 I. Operations/Field Overview CAO Mission The mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant (WIPP) for safe disposal of transuranic (TRU) waste and by establishing an effective system for management of TRU waste from generation to disposal. It includes personnel assigned to CAO, WIPP site operations, transportation, and other activities associated with the National TRU Program (NTP). The CAO develops and directs implementation of the TRU waste program, and assesses compliance with the program guidance, as well as the commonality of activities and assumptions among all TRU waste sites. NTP Program Management

86

EM SSAB Contributes Community Views to Clean-up Decisions  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contributes Community Views to Clean-up Decisions Contributes Community Views to Clean-up Decisions 2011 Local Board Contributions The Environmental Management Site-Specific Advisory Board (EM SSAB) has a unique mandate to provide input regarding the cleanup of nuclear legacy sites to the Department of Energy's Office of Environmental Management (EM). Chartered under the Federal Advisory Committee Act, the EM SSAB today comprises eight local boards, located in Hanford, WA; Idaho Falls, ID: Los Alamos, NM; the Nevada National Security Site; Oak Ridge, TN; Paducah, KY; Portsmouth, OH; and the Savannah River Site, SC. EM has made public participation a fundamental component of its cleanup mission and has found that the EM SSAB, which draws upon diverse community

87

Hanford Achieves a Cleanup First  

Energy.gov (U.S. Department of Energy (DOE))

RICHLAND, Wash. DOE contractors have completed cleanup of F Area, the first reactor area at the 586-square-mile Hanford site to be fully remediated.

88

Exemplary Hurricane Damage Cleanup Earns Petroleum Reserve Coveted  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Exemplary Hurricane Damage Cleanup Earns Petroleum Reserve Coveted Exemplary Hurricane Damage Cleanup Earns Petroleum Reserve Coveted Environmental Award Exemplary Hurricane Damage Cleanup Earns Petroleum Reserve Coveted Environmental Award April 22, 2010 - 1:00pm Addthis Washington, DC - An exceptional waste management project at a Texas Strategic Petroleum Reserve (SPR) site following Hurricane Ike in 2008 has won a DOE Environmental Sustainability (EStar) Award for Waste/Pollution Prevention. The award recognizes the SPR Storm Recovery Debris Waste Management Project at the Big Hill storage complex near Beaumont, Texas, which was heavily impacted by Hurricane Ike in September 2008. Selected annually by an independent panel of judges, EStar awards recognize environmental sustainability projects and programs that reduce risks and impacts, protect

89

EM Updates Congress on Nuclear Cleanup Progress in 18th Annual Caucus |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Updates Congress on Nuclear Cleanup Progress in 18th Annual EM Updates Congress on Nuclear Cleanup Progress in 18th Annual Caucus EM Updates Congress on Nuclear Cleanup Progress in 18th Annual Caucus March 1, 2012 - 12:00pm Addthis WASHINGTON, D.C. - EM and its cleanup contractors present briefings each year to the U.S. House Nuclear Cleanup Caucus on remediation operations at its major sites across the DOE complex. The briefings are organized by Rep. Doc Hastings (R-Wash.), who chairs the bipartisan caucus. For nearly two decades, the briefings have offered members of Congress and their staff, news media and other interested individuals insight into the progress of cleanup of the environmental legacy of the Cold War. EM site managers and their contractor counterparts provide updates on cleanup accomplishments, safety performance, budget scopes, cost savings and plans

90

Stimulus Funding Will Accelerate Cleanup In Idaho  

NLE Websites -- All DOE Office Websites (Extended Search)

STIMULUS FUNDING WILL STIMULUS FUNDING WILL ACCELERATE CLEANUP IN IDAHO Funding from the American Recovery and Reinvestment Act will do more than sustain employment at the U.S. Department of Energy's Idaho Site - it will accelerate cleanup. Click here to see larger image Inside the retrieval enclosure at Accelerated Retrieval Project-III Click on image to enlarge The Office of Environmental Management received $6 billon in additional funding under the "stimulus bill" passed earlier this year by Congress and signed by President Obama. The Idaho Site will receive $468 million of the EM funding. The funding will be used at DOE's Idaho Site to: Decontaminate and decommission buildings that have no useful mission. Accelerate removal of buried radioactive waste, which will be

91

F Reactor Area Cleanup Complete | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

F Reactor Area Cleanup Complete F Reactor Area Cleanup Complete F Reactor Area Cleanup Complete September 19, 2012 - 12:00pm Addthis Media Contact Cameron Hardy, DOE Cameron.Hardy@rl.doe.gov 509-376-5365 RICHLAND, Wash. - U.S. Department of Energy (DOE) contractors have cleaned up the F Reactor Area, the first reactor area at the Hanford Site in southeastern Washington state to be fully remediated. While six of Hanford's nine plutonium production reactors have been sealed up, or cocooned, the F Reactor Area is the first to have all of its associated buildings and waste sites cleaned up in addition to having its reactor sealed up. "The cleanup of the F Reactor Area shows the tremendous progress workers are making along Hanford's River Corridor," said Dave Huizenga, Senior Advisor for the DOE Office of Environmental Management. "The River

92

DOE Idaho site reaches 20-year cleanup milestone  

NLE Websites -- All DOE Office Websites (Extended Search)

IDAHO FALLS, IDAHO, 83403 IDAHO FALLS, IDAHO, 83403 Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: January 19, 2012 DOE Idaho site reaches 20-year cleanup milestone IDAHO FALLS, ID- In two decades of Superfund cleanup work, the U.S. Department of Energy's Idaho site has removed hundreds of thousands of cubic yards of radioactive and hazardously contaminated soils, excavated radioactive waste buried since the 1950s, removed three nuclear reactors and hundreds of buildings, completely closed three major nuclear facilities and removed thousands of unexploded ordnance shells and fragments. Last month marked the 20-year anniversary of the signing and implementation of a cleanup agreement between DOE, the U.S. Environmental Protection Agency and the state of Idaho. In two decades, the cleanup agreement known

93

Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accomplish Cleanup of Second Cold War Coal Ash Accomplish Cleanup of Second Cold War Coal Ash Basin Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin American Recovery and Reinvestment Act workers recently cleaned up a second basin containing coal ash residues from Cold War operations at the Savannah River Site (SRS). About $24 million from the Recovery Act funded the environmental restoration project, allowing SRS to complete the project at least five years ahead of schedule. The work is part of a larger Recovery Act cleanup of the P Area scheduled for completion by the end of September 2011. Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin More Documents & Publications Recovery Act Workers Complete Environmental Cleanup of Coal Ash Basin Recovery Act Workers Add Time Capsule Before Sealing Reactor for Hundreds

94

Advisory Board Meets to Discuss EM Cleanup's Future | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advisory Board Meets to Discuss EM Cleanup's Future Advisory Board Meets to Discuss EM Cleanup's Future Advisory Board Meets to Discuss EM Cleanup's Future December 6, 2012 - 12:00pm Addthis EM Principal Deputy Assistant Secretary Tracy Mustin, second from right, speaks with members of the Environmental Management Advisory Board this week as EM Deputy Assistant Secretary, Safety, Security and Quality Programs, Matthew Moury, second from left, listens. EM Principal Deputy Assistant Secretary Tracy Mustin, second from right, speaks with members of the Environmental Management Advisory Board this week as EM Deputy Assistant Secretary, Safety, Security and Quality Programs, Matthew Moury, second from left, listens. WASHINGTON, D.C. - EM Principal Deputy Assistant Secretary Tracy Mustin this week sought guidance from the Environmental Management Advisory Board

95

Deriving cleanup guidelines for radionuclides at Brookhaven National Laboratory  

Science Conference Proceedings (OSTI)

Past activities at Brookhaven National Laboratory (BNL) resulted in soil and groundwater contamination. As a result, BNL was designated a Superfund site under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). BNL`s Office of Environmental Restoration (OER) is overseeing environmental restoration activities at the Laboratory. With the exception of radium, there are no regulations or guidelines to establish cleanup guidelines for radionuclides in soils at BNL. BNL must derive radionuclide soil cleanup guidelines for a number of Operable Units (OUs) and Areas of Concern (AOCs). These guidelines are required by DOE under a proposed regulation for radiation protection of public health and the environment as well as to satisfy the requirements of CERCLA. The objective of this report is to propose a standard approach to deriving risk-based cleanup guidelines for radionuclides in soil at BNL. Implementation of the approach is briefly discussed.

Meinhold, A.F.; Morris, S.C.; Dionne, B.; Moskowitz, P.D.

1997-01-01T23:59:59.000Z

96

Report to Congress on the U.S. Department of Energy`s Environmental Management Science Program: Research funded and its linkages to environmental cleanup problems, and high out-year cost environmental management project descriptions. Volume 3 of 3 -- Appendix C  

SciTech Connect

The Department of Energy`s Environmental Management Science Program (EMSP) serves as a catalyst for the application of scientific discoveries to the development and deployment of technologies that will lead to reduction of the costs and risks associated with cleaning up the nation`s nuclear complex. Appendix C provides details about each of the Department`s 82 high cost projects and lists the EMSP research awards with potential to impact each of these projects. The high cost projects listed are those having costs greater than $50 million in constant 1998 dollars from the year 2007 and beyond, based on the March 1998 Accelerating Cleanup: Paths to Closure Draft data, and having costs of quantities of material associated with an environmental management problem area. The high cost project information is grouped by operations office and organized by site and project code. Each operations office section begins with a list of research needs associated with that operations office. Potentially related research awards are listed by problem area in the Index of Research Awards by Environmental Management Problem Area, which can be found at the end of appendices B and C. For projects that address high risks to the public, workers, or the environment, refer also the Health/Ecology/Risk problem area awards. Research needs are programmatic or technical challenges that may benefit from knowledge gained through basic research.

NONE

1998-04-01T23:59:59.000Z

97

Superfund Cleanups and Infant Health  

E-Print Network (OSTI)

We are the first to examine the effect of Superfund cleanups on infant health rather than focusing on proximity to a site. We study singleton births to mothers residing within 5km of a Superfund site between 1989 and 2003 ...

Currie, Janet

2011-02-23T23:59:59.000Z

98

U-PLANT GEOGRAPHIC ZONE CLEANUP PROTOTYPE  

Science Conference Proceedings (OSTI)

The U Plant geographic zone (UPZ) occupies 0.83 square kilometers on the Hanford Site Central Plateau (200 Area). It encompasses the U Plant canyon (221-U Facility), ancillary facilities that supported the canyon, soil waste sites, and underground pipelines. The UPZ cleanup initiative coordinates the cleanup of the major facilities, ancillary facilities, waste sites, and contaminated pipelines (collectively identified as ''cleanup items'') within the geographic zone. The UPZ was selected as a geographic cleanup zone prototype for resolving regulatory, technical, and stakeholder issues and demonstrating cleanup methods for several reasons: most of the area is inactive, sufficient characterization information is available to support decisions, cleanup of the high-risk waste sites will help protect the groundwater, and the zone contains a representative cross-section of the types of cleanup actions that will be required in other geographic zones. The UPZ cleanup demonstrates the first of 22 integrated zone cleanup actions on the Hanford Site Central Plateau to address threats to groundwater, the environment, and human health. The UPZ contains more than 100 individual cleanup items. Cleanup actions in the zone will be undertaken using multiple regulatory processes and decision documents. Cleanup actions will include building demolition, waste site and pipeline excavation, and the construction of multiple, large engineered barriers. In some cases, different cleanup actions may be taken at item locations that are immediately adjacent to each other. The cleanup planning and field activities for each cleanup item must be undertaken in a coordinated and cohesive manner to ensure effective execution of the UPZ cleanup initiative. The UPZ zone cleanup implementation plan (ZCIP) was developed to address the need for a fundamental integration tool for UPZ cleanup. As UPZ cleanup planning and implementation moves forward, the ZCIP is intended to be a living document that will provide a focal point for integrating UPZ actions, including field cleanup activities, waste staging and handling, and post-cleanup monitoring and institutional controls.

ROMINE, L.D.

2006-02-01T23:59:59.000Z

99

Oak Ridge Moves Forward in Mercury Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Moves Forward in Mercury Cleanup Oak Ridge Moves Forward in Mercury Cleanup Oak Ridge Moves Forward in Mercury Cleanup March 28, 2013 - 12:00pm Addthis Workers recently removed five large mercury-contaminated tanks from Y-12. Workers recently removed five large mercury-contaminated tanks from Y-12. Removing these tanks is part of the steps to reduce potential risk from mercury at Y-12. Removing these tanks is part of the steps to reduce potential risk from mercury at Y-12. Workers recently removed five large mercury-contaminated tanks from Y-12. Removing these tanks is part of the steps to reduce potential risk from mercury at Y-12. OAK RIDGE, Tenn. - Oak Ridge's EM program is making significant progress to reduce environmental mercury releases from the Y-12 National Security Complex. Mercury is one of the greatest environmental concerns facing the Oak Ridge

100

Oak Ridge Moves Forward in Mercury Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moves Forward in Mercury Cleanup Moves Forward in Mercury Cleanup Oak Ridge Moves Forward in Mercury Cleanup March 28, 2013 - 12:00pm Addthis Workers recently removed five large mercury-contaminated tanks from Y-12. Workers recently removed five large mercury-contaminated tanks from Y-12. Removing these tanks is part of the steps to reduce potential risk from mercury at Y-12. Removing these tanks is part of the steps to reduce potential risk from mercury at Y-12. Workers recently removed five large mercury-contaminated tanks from Y-12. Removing these tanks is part of the steps to reduce potential risk from mercury at Y-12. OAK RIDGE, Tenn. - Oak Ridge's EM program is making significant progress to reduce environmental mercury releases from the Y-12 National Security Complex. Mercury is one of the greatest environmental concerns facing the Oak Ridge

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin American Recovery and Reinvestment Act workers recently cleaned up a second basin containing coal ash residues from Cold War operations at the Savannah River Site (SRS). About $24 million from the Recovery Act funded the environmental restoration project, allowing SRS to complete the project at least five years ahead of schedule. The work is part of a larger Recovery Act cleanup of the P Area scheduled for completion by the end of September 2011. Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin More Documents & Publications EIS-0220: Final Environmental Impact Statement EIS-0220: Final Environmental Impact Statement

102

DOE Certifies Rocky Flats Cleanup "Complete" | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Certifies Rocky Flats Cleanup "Complete" Certifies Rocky Flats Cleanup "Complete" DOE Certifies Rocky Flats Cleanup "Complete" December 8, 2005 - 4:45pm Addthis Golden, CO - Deputy Secretary of Energy Clay Sell announced today that the environmental cleanup of the former Rocky Flats site has been certified complete by the U.S. Department of Energy. Certification marks the final step in the DOE's successful effort to clean up and eventually turn over the former weapons production site for use as a National Wildlife Refuge. "With today's announcement, the cleanup chapter of Rocky Flats' history is closed, while another equally important chapter is just being opened," said Deputy Secretary Sell. "This successful cleanup represents a triumph of determination and spirit of cooperation that stands as an example for

103

Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Completed; Report Now Available Online Second Site-Wide Five-Year Review of Cleanup at DOE's Idaho Site Completed; Report Now Available Online February 3, 2011 - 12:00pm Addthis Media Contact Danielle Miller (DOE-ID) 208-526-5709 An Idaho Cleanup Project team has completed work on the site-wide five-year review of cleanup at the U.S. Department of Energy's (DOE) Idaho site. "This report verifies that the performance of cleanup actions at the Idaho Site continues to be protective of human health and the environment," said Nicole Hernandez, DOE's project manager for the five-year review. "The findings in the report demonstrate a strong collaborative effort by CH2M-WG Idaho (CWI), DOE, the Environmental

104

Idaho Site's Cold War Cleanup Takes Center Stage in Publication |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site's Cold War Cleanup Takes Center Stage in Publication Site's Cold War Cleanup Takes Center Stage in Publication Idaho Site's Cold War Cleanup Takes Center Stage in Publication January 22, 2013 - 12:00pm Addthis The Society of American Military Engineers focuses on the Idaho site’s environmental cleanup in the latest issue of its publication, The Military Engineer. This photo of the Engineering Test Reactor, which was decommissioned and demolished at the Idaho site, is featured in the story. The Society of American Military Engineers focuses on the Idaho site's environmental cleanup in the latest issue of its publication, The Military Engineer. This photo of the Engineering Test Reactor, which was decommissioned and demolished at the Idaho site, is featured in the story. The Society of American Military Engineers highlights this Idaho site photo on the cover of the latest issue of its publication, The Military Engineer. In the photo, work is under way to move spent nuclear fuel from wet storage to the safer, more permanent alternative of dry storage.

105

Idaho Site's Cold War Cleanup Takes Center Stage in Publication |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Site's Cold War Cleanup Takes Center Stage in Publication Idaho Site's Cold War Cleanup Takes Center Stage in Publication Idaho Site's Cold War Cleanup Takes Center Stage in Publication January 22, 2013 - 12:00pm Addthis The Society of American Military Engineers focuses on the Idaho site’s environmental cleanup in the latest issue of its publication, The Military Engineer. This photo of the Engineering Test Reactor, which was decommissioned and demolished at the Idaho site, is featured in the story. The Society of American Military Engineers focuses on the Idaho site's environmental cleanup in the latest issue of its publication, The Military Engineer. This photo of the Engineering Test Reactor, which was decommissioned and demolished at the Idaho site, is featured in the story. The Society of American Military Engineers highlights this Idaho site photo on the cover of the latest issue of its publication, The Military Engineer. In the photo, work is under way to move spent nuclear fuel from wet storage to the safer, more permanent alternative of dry storage.

106

Role of Background in the CERCLA Cleanup Program  

NLE Websites -- All DOE Office Websites (Extended Search)

Background in the CERCLA Cleanup Program Background in the CERCLA Cleanup Program U.S. Environmental Protection Agency Office of Solid Waste and Emergency Response Office of Emergency and Remedial Response April 26, 2002 OSWER 9285.6-07P OSWER 9285.6-07P page 2 of 13 Table of Contents Purpose . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3 of 13 History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 4 of 13 Definitions of Terms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 5 of 13 Consideration of Background in Risk Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . Page 6 of 13 Consideration of Background in Risk Management . . . . . . . . . . . . . . . . . . . . . . . . . Page 7 of 13 Consideration of Background in Risk Communication . . . . . . . . . . . . . . . . . . . . . . . Page 8 of 13 Hypothetical Case Examples .

107

Argonne National Lab Cleanup schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

Takes Steps to Complete Clean-Up of Argonne by 2003; Takes Steps to Complete Clean-Up of Argonne by 2003; Schedule for Shipping Waste to WIPP is 'Good News' for Illinois CARLSBAD, N.M., May 15, 2000 - The U.S. Department of Energy (DOE) reinforced plans to complete the clean-up of its Argonne National Laboratory-East site in Illinois by 2003 by accelerating its schedule for shipping transuranic waste to DOE's permanent disposal site in New Mexico. Previously, the shipments were not expected to begin before 2003. Under the accelerated schedule, shipments to DOE's Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, are expected to begin in Spring 2001 and be completed by the end of the calendar year. Characterization of the waste currently stored at Argonne will begin this October. This agreement is a major step in honoring Argonne and DOE's commitment to the community to

108

Accelerating Clean-up at Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River More Documents & Publications Integrated Project Team RM...

109

Agencies sign last record of decision for DOE Idaho cleanup program  

NLE Websites -- All DOE Office Websites (Extended Search)

Agencies sign last record of decision for DOE Idaho cleanup program The U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency and the State of Idaho have signed...

110

Superfund Cleanups and Infant Health  

E-Print Network (OSTI)

We are the first to examine the effect of Superfund cleanups on infant health rather than focusing on proximity to a site. We study singleton births to mothers residing within 5km of a Superfund site between 1989-2003 in ...

Currie, Janet

111

Environmental Cleanup Reports | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FOIA Reports Calendar Year Reports Recovery Act Peer Reviews DOE Directives Performance Strategic Plan Testimony Financial Statements Semiannual Reports Work Plan Mission About...

112

E M Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

E M Environmental Management safety performance cleanup closure EM RECOVERY ACT TOP LINE MESSAGES * The Department estimates the 6 billion Recovery Act investment has allowed us...

113

Accelerating Clean-up at Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River More Documents & Publications Accelerating Clean-up at...

114

Cleanup at Los Alamos National Laboratory - the challenges - 9493  

SciTech Connect

This paper provides an overview of environmental cleanup at the Los Alamos National Laboratory (LANL) and some of the unique aspects and challenges. Cleanup of the 65-year old Department of Energy Laboratory is being conducted under a RCRA Consent Order with the State of New Mexico. This agreement is one of the most recent cleanup agreements signed in the DOE complex and was based on lessons learned at other DOE sites. A number of attributes create unique challenges for LANL cleanup -- the proximity to the community and pueblos, the site's topography and geology, and the nature of LANL's on-going missions. This overview paper will set the stage for other papers in this session, including papers that present: Plans to retrieve buried waste at Material Disposal Area B, across the street from oen of Los Alamos' commercial districts and the local newspaper; Progress to date and joint plans with WIPP for disposal of the remaining inventory of legacy transuranic waste; Reviews of both groundwater and surface water contamination and the factors complicating both characterization and remediation; Optimizing the disposal of low-level radioactive waste from ongoing LANL missions; A stakeholder environmental data transparency project (RACER), with full public access to all available information on contamination at LANL, and A description of the approach to waste processing cost recovery from the programs that generate hazardous and radioactive waste at LANL.

Stiger, Susan G [Los Alamos National Laboratory; Hargis, Kenneth M [Los Alamos National Laboratory; Graham, Michael J [Los Alamos National Laboratory; Rael, George J [NNSL/LASO

2008-01-01T23:59:59.000Z

115

M E Environmental Management Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

safety  performance  cleanup  closure safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management Office of Site Restoration, EM-10 Office of D&D and Facility Engineering, EM-13 Facility Deactivation & Decommissioning (D&D) D&D Program Map Addendum: Impact of American Recovery and Reinvestment Act (ARRA) on EM's D&D Program 2013 Edition U.S. Department Of Energy safety  performance  cleanup  closure M E Environmental Management Environmental Management safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management 3/13/2013 The American Recovery and Reinvestment Act of 2009

116

Idaho Site Enlists Whey-Eating Microbes in Groundwater Cleanup | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Enlists Whey-Eating Microbes in Groundwater Cleanup Enlists Whey-Eating Microbes in Groundwater Cleanup Idaho Site Enlists Whey-Eating Microbes in Groundwater Cleanup December 15, 2011 - 12:00pm Addthis IDAHO FALLS, Idaho - Workers at the Idaho site have enlisted microbes to help remediate previously contaminated groundwater and advance the protection of the Snake River Plain Aquifer. The microbes in the aquifer are fed a mixture of sodium lactate and whey powder, a common ingredient found in sport protein drinks. "The microbes eat it, and in the process break down trichloroethylene (TCE). Although TCE is a carcinogen, the end products are harmless," said Lorie Cahn, environmental lead for Environmental Restoration (ER) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) at CH2M-WG Idaho (CWI), the Idaho site's main cleanup

117

EA-1867: Scale-up of High-Temperature Syngas Cleanup Technology, Polk  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

7: Scale-up of High-Temperature Syngas Cleanup Technology, 7: Scale-up of High-Temperature Syngas Cleanup Technology, Polk County, Florida EA-1867: Scale-up of High-Temperature Syngas Cleanup Technology, Polk County, Florida Summary This EA evaluates the environmental impacts of a proposal to provide cost-shared funding to RTI International (RTI) for its proposed project to demonstrate the precommercial scale-up of RTI's high-temperature syngas cleanup and carbon capture and sequestration technologies. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download October 13, 2011 EA-1867: Finding of No Significant Impact RTI International Scale-Up of High-Temperature Syngas Cleanup and Carbon Capture and Sequestration Technologies, Polk County, Florida (October 2011)

118

DOE and NASA Reach Cleanup Agreements with the State of California for the  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NASA Reach Cleanup Agreements with the State of California NASA Reach Cleanup Agreements with the State of California for the Santa Susana Field Laboratory DOE and NASA Reach Cleanup Agreements with the State of California for the Santa Susana Field Laboratory December 6, 2010 - 12:00am Addthis Washington, D.C. - The Department of Energy and NASA both signed Administrative Orders on Consent (AOC) with the California Environmental Protection Agency (Cal EPA) today that define the process for characterization and the cleanup end-state for portions of the Santa Susana Field Laboratory (SSFL). The agreements come after more than 10 months of negotiations and extensive public comment on the conceptual framework for cleanup outlined in the Agreement in Principle and additional public comment on the legally enforceable process and procedures in the draft Administrative Order on

119

Waste Cleanup: Status and Implications of Compliance Agreements Between DOE and Its Regulators  

Science Conference Proceedings (OSTI)

This paper discusses compliance agreements that affect the Department of Energy's (DOE) cleanup program. Compliance agreements are legally enforceable documents between DOE and its regulators, specifying cleanup activities and milestones that DOE has agreed to achieve. Over the years, these compliance agreements have been used to implement much of the cleanup activity at DOE sites, which is carried our primarily under two federal laws - the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (CERCLA) and the Resource Conservation and Recovery Act of 0f 1976, as amended (RCRA). Our objectives were to determine the types of compliance agreements in effect at DOE cleanup sites, DOE's progress in achieving the milestones contained in the agreements, whether the agreements allowed DOE to prioritize work across sites according to relative risk, and possible implications the agreements have on DOE's efforts to improve the cleanup program.

Jones, G. L.; Swick, W. R.; Perry, T. C.; Kintner-Meyer, N.K.; Abraham, C. R.; Pollack, I. M.

2003-02-26T23:59:59.000Z

120

Agreement on New Commitments for Hanford Tank Waste Cleanup Sent to Federal  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Agreement on New Commitments for Hanford Tank Waste Cleanup Sent to Agreement on New Commitments for Hanford Tank Waste Cleanup Sent to Federal Judge Agreement on New Commitments for Hanford Tank Waste Cleanup Sent to Federal Judge October 6, 2010 - 12:00am Addthis RICHLAND, Wash. - The U.S. Department of Energy and Washington State Department of Ecology (Ecology) jointly filed a motion today in U.S. District Court asking the court to approve and enter a judicial consent decree that imposes a new, enforceable, and achievable schedule for cleaning up waste from Hanford's underground tanks. The settlement also includes new milestones in the Tri-Party Agreement (TPA), an administrative order between DOE, Ecology, and the U.S. Environmental Protection Agency, which governs cleanup at DOE's Hanford Site. "Today's agreement represents an important milestone in the ongoing cleanup

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

EM Risk and Cleanup Decision Making Presentation by Mark Gilbertson  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AND CLEANUP DECISION MAKING AND CLEANUP DECISION MAKING www.em.doe.gov 1 Mark Gilbertson Deputy Assistant Secretary for Site Restoration Office of Environmental Management May 31, 2012 Presented to Environmental Management Advisory Board Topics * How we got to where we are * Existing environment and health risk www.em.doe.gov 2 * Existing environment and health risk analysis to support decision-making * Considerations going forward The Past Five Years * FY2008 budget assumed ~$6 billion escalated for inflation over the following four years * Re-baselined the program and in some cases renegotiated milestones and contracts to align with the budget profile * Milestones were negotiated in good faith (~40 agreements/~200 major milestones/year) * Recognition that approximately 50% of the EM budget is "min safe"

122

Second site-wide five-year review of cleanup at DOE�s Idaho site  

NLE Websites -- All DOE Office Websites (Extended Search)

NEWS MEDIA CONTACT: Danielle Miller (DOE-ID) 208-526-5709 FOR IMMEDIATE RELEASE: Thursday, February 3, 2011 Second site-wide five-year review of cleanup at DOE�s Idaho site completed; report now available online An Idaho Cleanup Project team has completed work on the site-wide five-year review of cleanup at the U.S. Department of Energy�s (DOE) Idaho site. �This report verifies that the performance of cleanup actions at the Idaho Site continues to be protective of human health and the environment,� said Nicole Hernandez, DOE�s project manager for the five-year review. �The findings in the report demonstrate a strong collaborative effort by CH2M-WG Idaho (CWI), DOE, the Environmental Protection Agency (EPA), and the Idaho Department of Environmental Quality

123

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global Congress Dinner 2006 on Saturday, October 21st, 2006 in Seattle, Washington. "It is a great honor for the Department of Energy's Rocky Flats safe cleanup and closure effort to be recognized with this prestigious award," James Rispoli, Assistant Secretary of Energy for Environmental

124

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute DOE's Rocky Flats Cleanup Site Named 2006 Project of the Year By Project Management Institute October 23, 2006 - 9:17am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that the Project Management Institute (PMI) has awarded its 2006 Project of the Year to DOE's Rocky Flats Environmental Technology Site. The award was presented to DOE contractor Kaiser-Hill, LLC during the PMI Global Congress Dinner 2006 on Saturday, October 21st, 2006 in Seattle, Washington. "It is a great honor for the Department of Energy's Rocky Flats safe cleanup and closure effort to be recognized with this prestigious award," James Rispoli, Assistant Secretary of Energy for Environmental

125

Peconic River Cleanup at Brookhaven National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

a study of potential health impacts and developed various cleanup strategies. When the Lab and the Department of Energy (DOE) released a proposed plan for comment, the plan...

126

NETL: Gasification Systems - High Temperature Syngas Cleanup...  

NLE Websites -- All DOE Office Websites (Extended Search)

Hornick, Tampa Electric Company, Ben Gardner, RTI International, presented at the Gasification Technologies Conference, San Francisco, CA Oct 9-12, 2011. Warm Gas Clean-up and...

127

Rocky Flats Cleanup Agreement implementation successes and challenges  

SciTech Connect

On July 19, 1996 the US Department of Energy (DOE), State of Colorado (CDPHE), and US Environmental Protection Agency (EPA) entered into an agreement called the Rocky Flats Cleanup Agreement (RFCA) for the cleanup and closure of the Rocky Flats Environmental Technology Site (RFETS or Rocky Flats). Major elements of the agreement include: an Integrated Site-Wide Baseline; up to twelve significant enforceable milestones per year; agreed upon soil and water action levels and standards for cleanup; open space as the likely foreseeable land use; the plutonium and TRU waste removed by 2015; streamlined regulatory process; agreement with the Defense Nuclear Facilities Safety Board (DNFSB) to coordinate activities; and a risk reduction focus. Successful implementation of RFCA requires a substantial effort by the parties to change their way of thinking about RFETS and meet the deliverables and commitments. Substantial progress toward Site closure through the implementation of RFCA has been accomplished in the short time since the signing, yet much remains to be done. Much can be learned from the Rocky Flats experience by other facilities in similar situations.

Shelton, D.C.

1997-02-01T23:59:59.000Z

128

DOE Announces Strategic Engineering and Technology Roadmap for Cleanup of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Strategic Engineering and Technology Roadmap for Strategic Engineering and Technology Roadmap for Cleanup of Cold War Era Nuclear Waste DOE Announces Strategic Engineering and Technology Roadmap for Cleanup of Cold War Era Nuclear Waste March 18, 2008 - 10:52am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today released an Engineering and Technology Roadmap (Roadmap), which details initiatives aimed at reducing the technical risks and uncertainties associated with cleaning up Cold War era nuclear waste over the next ten years. The Roadmap also outlines strategies to minimize such risks and proposes how these strategies would be implemented, furthering the Department's goal of protecting the environment by providing a responsible resolution to the environmental legacy of nuclear weapons production.

129

Roundtable on Long-Term Management In The Cleanup of Contaminated Sites  

SciTech Connect

The Center for Public Environmental Oversight (CPEO) convened a roundtable in Washington, DC on June 28, 2002 to discuss innovative approaches to long-term management in the cleanup of contaminated property. Twenty participants attended the meeting, including representatives of federal agencies, local government, state regulatory agencies, environmental organizations, and thinking tanks, as well as private consultants with experience in site remediation and redevelopment.

Aimee Houghton

2002-06-28T23:59:59.000Z

130

Collusion Through Insurance: Sharing the Costs of Oil Spill Cleanups  

E-Print Network (OSTI)

Insurance: Sharing the Costs of Oil Spill Cleanups." EddieInsurance: Sharing the Costs of Oil Spill Cleanups EddieINSURANCE: SHARING THE COSTS OF OIL SPILL CLEANUPS Eddie

Dekel, Eddie; Scothmer, Suzanne

1989-01-01T23:59:59.000Z

131

Accelerating Clean-up at Savannah River | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River Accelerating Clean-up at Savannah River More Documents & Publications Project NameDescription Slide...

132

Department of Energy reaches an agreement in principle on the cleanup of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

reaches an agreement in principle on the reaches an agreement in principle on the cleanup of the Santa Susana Field Lab site in Simi Valley Department of Energy reaches an agreement in principle on the cleanup of the Santa Susana Field Lab site in Simi Valley September 3, 2010 - 12:00am Addthis WASHINGTON, D.C. - The Department of Energy announced today that it has reached an agreement in principle with California's Department of Toxic Substances Control (DTSC) and NASA on the cleanup of the Santa Susana Field Lab (SSFL) site in Simi Valley. "The Department is pleased that we have achieved a conceptual agreement for cleanup of the DOE portion of the Santa Susana Field Lab site," said Dr. Ines Triay, DOE Assistant Secretary for Environmental Management. "By putting to one side unresolved legal issues and working together, we have

133

Recovery Act Exceeds Major Cleanup Milestone, DOE Complex Now 74 Percent  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Recovery Act Exceeds Major Cleanup Milestone, DOE Complex Now 74 Recovery Act Exceeds Major Cleanup Milestone, DOE Complex Now 74 Percent Remediated Recovery Act Exceeds Major Cleanup Milestone, DOE Complex Now 74 Percent Remediated The Office of Environmental Management's (EM) American Recovery and Reinvestment Act Program recently achieved 74 percent footprint reduction, exceeding the originally established goal of 40 percent. EM has reduced its pre-Recovery Act footprint of 931 square miles, established in 2009, by 688 square miles. Reducing its contaminated footprint to 243 square miles has proven to be a monumental task, and a challenge the EM team was ready to take on from the beginning. Recovery Act Exceeds Major Cleanup Milestone, DOE Complex Now 74 Percent Remediated More Documents & Publications 2011 ARRA Newsletters

134

DOE extends the Idaho Cleanup Project Contract for Three Years | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

extends the Idaho Cleanup Project Contract for Three Years extends the Idaho Cleanup Project Contract for Three Years DOE extends the Idaho Cleanup Project Contract for Three Years September 25, 2012 - 12:00pm Addthis Media Contacts Brad Bugger 208-526-0833 Danielle Miller 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy has extended by three years its contract with the company currently operating the Idaho Cleanup Project at the department's Idaho Site. CH2M-WG Idaho, LLC's (CWI) period of performance on the current contract ends September 30, 2012. DOE extended their contract through September 30, 2015, and the anticipated dollar value of this extension is $730 million. This extension will help ensure that the government receives the highest return on investment for its environmental restoration work. Since 2005,

135

Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

21, 2011 21, 2011 Recovery Act Workers Accomplish Cleanup of Second Cold War Coal Ash Basin AIKEN, S.C. - American Recovery and Reinvestment Act workers re- cently cleaned up a second basin containing coal ash residues from Cold War operations at the Savannah River Site (SRS). About $24 million from the Recovery Act funded the environmental restoration project, allowing SRS to complete the project at least five years ahead of schedule. The work is part of a larger Recovery Act cleanup of the P Area scheduled for completion by the end of September 2011. The bulk of that cleanup involves deactivating and decommissioning a nuclear materials production reactor that occu- pies more than 300,000 square feet of space. The P Area cleanup will reduce the Cold War footprint by 31 square

136

DOE Awards Small Business Contract to Support Cleanup of New York West  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Support Cleanup of New York to Support Cleanup of New York West Valley Demonstration Project DOE Awards Small Business Contract to Support Cleanup of New York West Valley Demonstration Project March 1, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 bill.taylor@srs.gov Cincinnati - The Department of Energy (DOE) today awarded a contract to Enviro Compliance Solutions Inc. of Tustin, California to perform environmental sampling, monitoring services and analysis of ongoing cleanup activities being performed at the West Valley Demonstration Project in western New York. The contract is an Indefinite Delivery/Indefinite Quantity (ID/IQ) with a $4 million value and a three-year period of performance. Enviro Compliance Solutions Inc. is a small-disadvantaged business under the Small Business Administration's 8(a) Program. Firm-Fixed-Price and

137

DOE Awards Contract for Moab Mill Tailings Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moab Mill Tailings Cleanup Moab Mill Tailings Cleanup DOE Awards Contract for Moab Mill Tailings Cleanup November 4, 2011 - 12:00pm Addthis Media Contact Bill Taylor bill.taylor@srs.gov 803-952-8564 Cincinnati- The Department of Energy (DOE) announced today that it has awarded a competitive small business contract worth $121.2 million over the next five years as part of the Department's continued efforts to protect the Colorado River and downstream water users by removing uranium tailings at the former Atlas uranium-ore processing facility in Moab, Utah. Portage, Inc., a small business based in Idaho Falls, Idaho, will be leading the new contract. "The Moab project has the potential of being one of the Department of Energy's most successful environmental cleanup projects," Donald

138

DOE extends the Idaho Cleanup Project Contract for Three Years | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

extends the Idaho Cleanup Project Contract for Three Years extends the Idaho Cleanup Project Contract for Three Years DOE extends the Idaho Cleanup Project Contract for Three Years September 25, 2012 - 12:00pm Addthis Media Contacts Brad Bugger 208-526-0833 Danielle Miller 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy has extended by three years its contract with the company currently operating the Idaho Cleanup Project at the department's Idaho Site. CH2M-WG Idaho, LLC's (CWI) period of performance on the current contract ends September 30, 2012. DOE extended their contract through September 30, 2015, and the anticipated dollar value of this extension is $730 million. This extension will help ensure that the government receives the highest return on investment for its environmental restoration work. Since 2005,

139

HANFORD SITE RIVER CORRIDOR CLEANUP  

SciTech Connect

In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

BAZZELL, K.D.

2006-02-01T23:59:59.000Z

140

Site Transition Process upon Completion of the Cleanup Mission...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) DOE's...

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

DOE Awards Small Business Contract to Support Cleanup of New...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

to Support Cleanup of New York West Valley Demonstration Project DOE Awards Small Business Contract to Support Cleanup of New York West Valley Demonstration Project March 1, 2013 -...

142

Workers at Hanford Site Achieve Recovery Act Legacy Cleanup Goals...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

at Hanford Site Achieve Recovery Act Legacy Cleanup Goals Ahead of Schedule Workers at Hanford Site Achieve Recovery Act Legacy Cleanup Goals Ahead of Schedule The Hanford Site...

143

Meeting Offers Opportunity to Discuss EM Cleanup with China | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting Offers Opportunity to Discuss EM Cleanup with China Meeting Offers Opportunity to Discuss EM Cleanup with China Meeting Offers Opportunity to Discuss EM Cleanup with China April 29, 2013 - 12:00pm Addthis Members of the Environment and Waste Management Working Group of the Peaceful Uses of Nuclear Technology Joint Coordinated Committee from DOE include, front row, EM Technical Advisor for Foreign Affairs Rosa Elmetti (center) and EM Office of Tank Waste Management Director Steve Schneider (right); middle row, Lawrence Livermore National Laboratory Manager for Environmental Restoration Jesse Yow (left) and EM Savannah River Operations Office Assistant Manager for Infrastructure and Environmental Stewardship Karen Guevara (center); and third row, Savannah River National Laboratory Associate Laboratory Director for Environmental Stewardship Dr. Jeff Griffin (second from right).

144

Meeting Offers Opportunity to Discuss EM Cleanup with China | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Meeting Offers Opportunity to Discuss EM Cleanup with China Meeting Offers Opportunity to Discuss EM Cleanup with China Meeting Offers Opportunity to Discuss EM Cleanup with China April 29, 2013 - 12:00pm Addthis Members of the Environment and Waste Management Working Group of the Peaceful Uses of Nuclear Technology Joint Coordinated Committee from DOE include, front row, EM Technical Advisor for Foreign Affairs Rosa Elmetti (center) and EM Office of Tank Waste Management Director Steve Schneider (right); middle row, Lawrence Livermore National Laboratory Manager for Environmental Restoration Jesse Yow (left) and EM Savannah River Operations Office Assistant Manager for Infrastructure and Environmental Stewardship Karen Guevara (center); and third row, Savannah River National Laboratory Associate Laboratory Director for Environmental Stewardship Dr. Jeff Griffin (second from right).

145

FY 2013 Budget Request Office of Environmental Management | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FY 2013 Budget Request Office of Environmental Management FY 2013 Budget Request Office of Environmental Management The FY 2013 budget will support major cleanup accomplishments in...

146

Lab completes first Recovery Act cleanup project  

NLE Websites -- All DOE Office Websites (Extended Search)

facility began in May and proceeded quickly. As part of the cleanup, a nearly new backup diesel generator was removed from the building and later donated to a nonprofit hospital...

147

2013 Congressional Nuclear Cleanup Caucus Briefings  

Energy.gov (U.S. Department of Energy (DOE))

The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress.

148

Microsoft Word - California_cleanup.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

Completes California Sites Cleanup CARLSBAD, N.M., June 14, 2010 - The U.S. Department of Energy's Carlsbad Field Office (CBFO) has successfully completed its campaign to clean up...

149

Gas separation and hot-gas cleanup  

DOE Green Energy (OSTI)

Catalytic gasification of coal to produce H{sub 2}-, CO-, and CH{sub 4}-rich mixtures of gases for consumption in molten carbonate fuel cells is currently under development; however, to optimize the fuel cell performance and extend its operating life,it is desired to separate as much of the inert components (i.e., CO{sub 2} and N{sub 2}) and impurities (i.e., H{sub 2}S and NH{sub 3}) as possible from the fuel gas before it enters the fuel cell. In addition, the economics of the integrated gasification combined cycle (IGCC) can be improved by separating as much of the hydrogen as possible from the fuel, since hydrogen is a high-value product. Researchers at the Energy & Environmental Research Center and Bend Research, Inc., investigated pressure-driven membranes as a method for accomplishing this gas separation and hot-gas cleanup. These membranes are operated at temperatures as high as 800{degrees}C and at pressures up to 300 psig. They have very small pore sizes that separate the undesirable gases by operating in the Knudsen diffusion region of mass transport (30 -50{Angstrom}) or in the molecular sieving region of mass transport phenomena (<5{Angstrom}). In addition, H{sub 2} separation through a palladium metal membrane proceeds via a solution-diffusion mechanism for atomic hydrogen. This allows the membranes to exhibit extremely high selectivity for hydrogen separation. The objective of this study was to determine the selectivity of the ceramic membranes for removing undesirable gases while allowing the desired gases to be concentrated in the permeate stream.

Swanson, M.L.

1996-11-01T23:59:59.000Z

150

Demolition, Groundwater Cleanup Highlight Paducah's 2013 Accomplishments  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Demolition, Groundwater Cleanup Highlight Paducah's 2013 Demolition, Groundwater Cleanup Highlight Paducah's 2013 Accomplishments Demolition, Groundwater Cleanup Highlight Paducah's 2013 Accomplishments December 24, 2013 - 12:00pm Addthis A high-reach shear removes debris from the tallest structure of the C-340 complex at Paducah. Watch a video of this work here. The 120-foot-high Metals Plant was the tallest building at the Paducah site and encompassed about 1.5 million cubic feet, the volume of a football field roughly three stories tall. Demolition debris filled 28 rail cars and was shipped offsite for disposal. A high-reach shear removes debris from the tallest structure of the C-340 complex at Paducah. Watch a video of this work here. The 120-foot-high Metals Plant was the tallest building at the Paducah site and encompassed

151

Summary of proposed approach for deriving cleanup guidelines for radionuclides in soil at Brookhaven National Laboratory  

Science Conference Proceedings (OSTI)

Past activities at Brookhaven National Laboratory (BNL) resulted in soil and groundwater contamination. As a result, BNL was designated a Superfund site under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). BNL`s Office of Environmental Restoration (OER) is overseeing environmental restoration activities at the Laboratory, carried out under an Interagency Agreement (IAG) with the United States Department of Energy (DOE), the United States Environmental Protection Agency (EPA) and the New York State Department of Environmental Conservation (NYSDEC). The objective of this paper is to propose a standard approach to deriving risk-based cleanup guidelines for radionuclides in soil at BNL.

Meinhold, A.F.; Morris, S.C.; Dionne, B.; Moskowitz, P.D.

1996-11-01T23:59:59.000Z

152

Southwest Plume Cleanup at Paducah Site to Start by Summer 2013 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southwest Plume Cleanup at Paducah Site to Start by Summer 2013 Southwest Plume Cleanup at Paducah Site to Start by Summer 2013 Southwest Plume Cleanup at Paducah Site to Start by Summer 2013 April 1, 2012 - 12:00pm Addthis Deep soil mixing at the Paducah site will involve a large-diameter auger like this one. Deep soil mixing at the Paducah site will involve a large-diameter auger like this one. Senior Advisor for Environmental Management David Huizenga (right) and Paducah Site Lead Reinhard Knerr look at a three-dimensional model of the Paducah site’s groundwater system. University of Kentucky College of Design students assembled the model for the Paducah Gaseous Diffusion Plant Citizens Advisory Board. The model was displayed at the April 18 Site-Specific Advisory Board Chairs Meeting in Paducah, where Huizenga spoke before taking his first tour of the Paducah site.

153

Southwest Plume Cleanup at Paducah Site to Start by Summer 2013 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Southwest Plume Cleanup at Paducah Site to Start by Summer 2013 Southwest Plume Cleanup at Paducah Site to Start by Summer 2013 Southwest Plume Cleanup at Paducah Site to Start by Summer 2013 April 1, 2012 - 12:00pm Addthis Deep soil mixing at the Paducah site will involve a large-diameter auger like this one. Deep soil mixing at the Paducah site will involve a large-diameter auger like this one. Senior Advisor for Environmental Management David Huizenga (right) and Paducah Site Lead Reinhard Knerr look at a three-dimensional model of the Paducah site’s groundwater system. University of Kentucky College of Design students assembled the model for the Paducah Gaseous Diffusion Plant Citizens Advisory Board. The model was displayed at the April 18 Site-Specific Advisory Board Chairs Meeting in Paducah, where Huizenga spoke before taking his first tour of the Paducah site.

154

FIXED-PRICE CONTRACTING FOR DEPARTMENT OF ENERGY CLEANUP ACTIVITIES...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FIXED-PRICE CONTRACTING FOR DEPARTMENT OF ENERGY CLEANUP ACTIVITIES, CR-B-02-01 FIXED-PRICE CONTRACTING FOR DEPARTMENT OF ENERGY CLEANUP ACTIVITIES, CR-B-02-01 As part of its...

155

Idaho Cleanup Project completes work at Test Area North complex...  

NLE Websites -- All DOE Office Websites (Extended Search)

Idaho Cleanup Project completes work at Test Area North complex at DOEs Idaho site Loss-Of-Fluid Test Reactor Facility (before) Idaho Cleanup Project workers have completed all...

156

Assessment of synfuel spill cleanup options  

DOE Green Energy (OSTI)

Existing petroleum-spill cleanup technologies are reviewed and their limitations, should they be used to mitigate the effects of synfuels spills, are discussed. The six subsections of this report address the following program goals: synfuels production estimates to the year 2000; possible sources of synfuel spills and volumes of spilled fuel to the year 2000; hazards of synfuels spills; assessment of existing spill cleanup technologies for oil spills; assessment of cleanup technologies for synfuel spills; and disposal of residue from synfuel spill cleanup operations. The first goal of the program was to obtain the most current estimates on synfuel production. These estimates were then used to determine the amount of synfuels and synfuel products likely to be spilled, by location and by method of transportation. A review of existing toxicological studies and existing spill mitigation technologies was then completed to determine the potential impacts of synthetic fuel spills on the environment. Data are presented in the four appendixes on the following subjects: synfuel production estimates; acute toxicity of synfuel; acute toxicity of alcohols.

Petty, S.E.; Wakamiya, W.; English, C.J.; Strand, J.A.; Mahlum, D.D.

1982-04-01T23:59:59.000Z

157

Idaho Cleanup Project CH2M-WG Idaho, LLC | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Cleanup Project CH2M-WG Idaho, LLC Idaho Cleanup Project CH2M-WG Idaho, LLC Idaho Cleanup Project Idaho Cleanup Project CH2M-WG Idaho, LLC More Documents & Publications...

158

Public comment sought on soil cleanup project at the Idaho Site�s Test  

NLE Websites -- All DOE Office Websites (Extended Search)

Public comment sought on soil cleanup project at the Idaho Site�s Test Area North Complex Public comment sought on soil cleanup project at the Idaho Site�s Test Area North Complex The U.S. Department of Energy (DOE) is seeking public comment on a small-scale soil cleanup at the Idaho Site�s Test Area North (TAN) complex. An Engineering Evaluation/Cost Analysis (EE/CA) document with three proposed alternatives for the soil cleanup is under evaluation by DOE, the U.S. Environmental Protection Agency, and Idaho�s Department of Environmental Quality. Full-scale decommissioning, decontamination, and demolition of the major TAN facilities began in 2005 and the work was completed in 2008. The project under evaluation includes cleaning up contaminated soil at a former wastewater disposal pond. From 1972 until 2007, the pond received treated sanitary wastewater, low-level radioactive wastewater, and cold process water. Because of the low levels of soil contamination the 3.2-acre area continued to be evaluated, using institutional controls for sampling and monitoring. Further evaluation determined that the 3.2 acre area contained contaminants requiring remediation.

159

Continuing Clean-up at Oak Ridge, Portsmouth and Paducah-Successes and Near-Term Plans  

Science Conference Proceedings (OSTI)

This paper describes the complexities and challenges associated with the Oak Ridge Environmental Management (EM) cleanup program and the steps that DOE and Bechtel Jacobs Company LLC (the Oak Ridge EM team) have collaboratively taken to make significant physical progress and get the job done. Maintaining significant environmental cleanup progress is a daunting challenge for the Oak Ridge EM Team. The scale and span of the Oak Ridge Operations (ORO) cleanup is immense-five major half-century-old installations in three states (three installations are complete gaseous diffusion plants), with concurrent cleanup at the fully operational Oak Ridge National Laboratory and Y-12 National Security Complex, and with regulatory oversight from three states and two United States (US) Environmental Protection Agency (EPA) Regions. Potential distractions arising from funding fluctuations and color-of-money constraints, regulatory negotiations, stakeholder issues, or any one of a number of other potential delay phenomena can not reduce the focus on safely achieving project objectives to maintain cleanup momentum.

Fritz, L. L.; Houser, S. M.; Starling, D. A.

2002-02-26T23:59:59.000Z

160

Microsoft Word - cleanup projects at Idaho.doc  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. Department of Energy Office of Inspector General Office of Audit Operations Audit Report Major Clean-Up Projects at the Idaho National Engineering and Environmental Laboratory DOE/IG-0649 May 2004 well after its scheduled July 1, 2003, completion date - in fact, it is currently estimated to be sometime in 2005 or 2006. The Department also did not meet its original completion goal for the Three Mile Island Project and later reduced the scope of the project to compensate for schedule slippages. Although events outside of the Department's control contributed to these schedule delays, enhancements to contract and project management practices could improve the way the Department and its contractors react to these events and ultimately the projects' outcomes.

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Biogas Impurities and Cleanup for Fuel Cells  

NLE Websites -- All DOE Office Websites (Extended Search)

Impurities and Cleanup for Fuel Cells Impurities and Cleanup for Fuel Cells Dennis Papadias and Shabbir Ahmed Argonne National Laboratory Presented at the Biogas and Fuel Cells Workshop Golden, CO June 11-13, 2012 Biogas is the product of anaerobic decomposition of organic waste Municipal solid wastes (MSW)  For every 1 million tons of MSW: - 432,000 cubic feet per day of landfill gas (LFG) for a period of 20 years - 1 MW of electricity 1 Sewage sludge/waste water (WWTP or ADG)  A typical WWTP processes 100 gallons per day (GD) for every person served - 1 cubic foot of digester gas can be produced per 100 gallons of wastewater  100 kW of electricity 1 can be generated from 4.5 MGD of waste water Agricultural waste (i.e. dairy waste)  About 70-100 ft 3 /day of digester gas is produced

162

Los Alamos National Laboratory: Long-Term Environmental Stewardship...  

NLE Websites -- All DOE Office Websites (Extended Search)

with our workforce, sponsors, and public. We reduce our environmental risk through legacy cleanup, pollution prevention, and long-term sustainability programs." View document >...

163

EA-1345: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Assessment EA-1345: Final Environmental Assessment Cleanup and Closure of the Energy Technology Engineering Center DOE will use this EA, and other relevant information,...

164

Hanford Site Cleanup Challenges and Opportunities for Science and Technology--A Strategic Assessment  

SciTech Connect

The sheer expanse of the Hanford Site, the inherent hazards associated with the significant inventory of nuclear materials and wastes, the large number of aging contaminated facilities, the diverse nature and extent of environmental contamination, and the proximity to the Columbia River make Hanford perhaps the world's largest and most complex environmental cleanup project. It is not possible to address the more complex elements of this enormous challenge in a cost-effective manner without strategic investments in science and technology. Success requires vigorous and sustained efforts to enhance the science and technology basis, develop and deploy innovative solutions, and provide firm scientific bases to support site cleanup and closure decisions at Hanford.

Wood, Thomas W.; Johnson, Wayne L.; Kreid, Dennis K.; Walton, Terry L.

2001-02-01T23:59:59.000Z

165

Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 2.3: Sulfur Primer  

DOE Green Energy (OSTI)

This deliverable is Subtask 2.3 of Task 2, Gas Cleanup Design and Cost Estimates, of NREL Award ACO-5-44027, ''Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup and Oxygen Separation Equipment''. Subtask 2.3 builds upon the sulfur removal information first presented in Subtask 2.1, Gas Cleanup Technologies for Biomass Gasification by adding additional information on the commercial applications, manufacturers, environmental footprint, and technical specifications for sulfur removal technologies. The data was obtained from Nexant's experience, input from GTI and other vendors, past and current facility data, and existing literature.

Nexant Inc.

2006-05-01T23:59:59.000Z

166

Integrated Warm Gas Multicontaminant Cleanup Technologies for Coal-Derived Syngas  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Warm Gas Multicontaminant Integrated Warm Gas Multicontaminant Cleanup Technologies for Coal-Derived Syngas Description Integrated Gasification Combined Cycle (IGCC) technology offers a means to utilize coal -the most abundant fuel in the United States-to produce a host of products, ranging from electricity to value-added chemicals like transportation fuels and hydrogen, in an efficient, environmentally friendly manner. However, the overall cost (capital, operating,

167

DOE Completes TRU Waste Cleanup at Bettis | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

TRU Waste Cleanup at Bettis TRU Waste Cleanup at Bettis DOE Completes TRU Waste Cleanup at Bettis September 23, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. - The U.S. Department of Energy (DOE) has successfully completed cleanup of all Cold War legacy transuranic (TRU) waste at the Bettis Atomic Power Laboratory (BAPL) near Pittsburgh, Pa., permanently disposing of it at the Waste Isolation Pilot Plant (WIPP). BAPL is the 20th site to be completely cleaned of legacy TRU waste. This milestone was achieved using approximately $640,000 of a $172 million investment from the American Recovery and Reinvestment Act to expedite legacy waste cleanup activities across the DOE complex. This summer, TRU waste cleanup was also completed at the Nuclear Radiation Development, LLC,

168

Manhattan Project Truck Unearthed in Recovery Act Cleanup | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Manhattan Project Truck Unearthed in Recovery Act Cleanup Manhattan Project Truck Unearthed in Recovery Act Cleanup Manhattan Project Truck Unearthed in Recovery Act Cleanup A Los Alamos National Laboratory (LANL) excavation crew working on an American Recovery and Reinvestment Act cleanup project has uncovered the remnants of a 1940s military truck buried in a Manhattan Project landfill. The truck was unearthed inside a sealed building where digging is taking place at Material Disposal Area B (MDA-B), the Lab's first hazardous and radioactive waste landfill. MDA-B was used from 1944 to 1948. Manhattan Project Truck Unearthed in Recovery Act Cleanup More Documents & Publications Los Alamos Lab Completes Excavation of Waste Disposal Site Used in the 1940s Protecting Recovery Act Cleanup Site During Massive Wildfire

169

Recovery Act Investment Accelerates Cleanup Work at DOE's Paducah Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Investment Accelerates Cleanup Work at DOE's Paducah Investment Accelerates Cleanup Work at DOE's Paducah Site Recovery Act Investment Accelerates Cleanup Work at DOE's Paducah Site July 15, 2011 - 12:00pm Addthis UF6 piping deactivation The black inlet hose is attached to a negative air machine that allows Feed Plant cleanup workers to safely deactivate uranium hexafluoride (UF6) piping, seen at right of the lift supporting the crew. UF6 piping deactivation The black inlet hose is attached to a negative air machine that allows Feed Plant cleanup workers to safely deactivate uranium hexafluoride (UF6) piping, seen at right of the lift supporting the crew. Heavy equipment demo Heavy equipment demolishes the last part of the eastern third of the Feed Plant at the Paducah Site. Cleanup continues to prepare the remaining part of the complex, backgroundfor demolition later.

170

Particulate hot gas stream cleanup technical issues  

Science Conference Proceedings (OSTI)

The analyses of hot gas stream cleanup particulate samples and descriptions of filter performance studied under this contract were designed to address problems with filter operation that have been linked to characteristics of the collected particulate matter. One objective of this work was to generate an interactive, computerized data bank of the key physical and chemical characteristics of ash and char collected from operating advanced particle filters and to relate these characteristics to the operation and performance of these filters. The interactive data bank summarizes analyses of over 160 ash and char samples from fifteen pressurized fluidized-bed combustion and gasification facilities utilizing high-temperature, high pressure barrier filters.

Pontius, D.H.; Snyder, T.R.

1999-09-30T23:59:59.000Z

171

TRUEX process solvent cleanup with solid sorbents  

SciTech Connect

Solid sorbents, alumina, silica gel, and Amberlyst A-26 have been tested for the cleanup of degraded TRUEX-NPH solvent. A sodium carbonate scrub alone does not completely remove acidic degradation products from highly degraded solvent and cannot restore the stripping performance of the solvent. By following the carbonate scrub with either neutral alumina or Amberlyst A-26 anion exchange resin, the performance of the TRUEX-NPH is substantially restored. The degraded TRUEX-NPH was characterized before and after treatment by supercritical fluid chromatography. Its performance was evaluated by americium distribution ratios, phase-separation times, and lauric acid distribution coefficients. 17 refs., 2 figs., 5 tabs.

Tse, Pui-Kwan; Reichley-Yinger, L.; Vandegrift, G.F.

1989-01-01T23:59:59.000Z

172

Assessment of Nuclear Safety Culture at the Idaho Cleanup Project...  

NLE Websites -- All DOE Office Websites (Extended Search)

Oversight Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project May 2011 November 2012 Office of Safety and Emergency...

173

IMPORTANT CLEANUP PROJECT TO RESUME AT IDAHO NATIONAL LABORATORY  

NLE Websites -- All DOE Office Websites (Extended Search)

the Department of Energy for other cleanup work at the INL, including decontaminating and decommissioning three nuclear reactors - started in 2005 and completed last year. That...

174

Manhattan Project truck unearthed at landfill cleanup site  

NLE Websites -- All DOE Office Websites (Extended Search)

Phonebook Calendar Video Newsroom News Releases News Releases - 2011 April Manhattan project truck Manhattan Project truck unearthed at landfill cleanup site A LANL...

175

ORNL research reveals new challenges for mercury cleanup | ornl...  

NLE Websites -- All DOE Office Websites (Extended Search)

Jennifer Brouner Communications 865.241.0709 ORNL research reveals new challenges for mercury cleanup ORNL researchers are learning more about the microbial processes that convert...

176

Recovery Act funding accelerates cleanup of Idaho Site, Creates...  

NLE Websites -- All DOE Office Websites (Extended Search)

Recovery Act funding accelerates cleanup of Idaho Site, Creates jobs in community IDAHO FALLS American Recovery and Reinvestment Act (ARRA) funding has accelerated a project...

177

IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER  

NLE Websites -- All DOE Office Websites (Extended Search)

Contact: Brad Bugger (208) 526-0833 For Immediate Release: Wednesday, June 29, 2011 IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER Idaho Falls, ID The...

178

New strategy for accelerating cleanup of Hanford reactor areas  

SciTech Connect

The initial work plans for cleanup of the 100 areas at Hanford followed the traditional Superfund path with a somewhat linear and phased process of investigation and decision making. Due to the complexity of the waste sites, the need to characterize existing mixed waste and hazardous-waste contamination and the need to obtain high-quality data for decision making, the proposed investigation schedules were typically 7 to 9 yr long. In addition, a large amount of resources and funding was committed to this investigative phase without achieving any remediation or reduction in risk. To correct these deficiencies, a new strategy was developed for use at the Hanford site, the Hanford Past Practice Investigation Strategy (HPPIS). In late 1991, work plans were revised to reflect this strategy, and field work is under way. These changes will result in savings in excess of $100,000,000 in remedial investigation/feasibility study (RI/FS) costs. The plutonium production reactor areas at the U.S. Department of Energy (DOE) Hanford site, near Richland, Washington, were included on the U.S. Environmental Protection Agency's (EPA's) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) in 1989.

Krug, A.D.; Day, R.E.; Lauterbach, M.J. (Westinghouse Hanford Co., Richland, WA (United States))

1992-01-01T23:59:59.000Z

179

An Act Relative to Environmental Cleanup and Promoting the Redevelopme...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nonprofit Rural Electric Cooperative Tribal Government Utility Savings For Alternative Fuel Vehicles Hydrogen & Fuel Cells Home Weatherization Water Buying & Making Electricity...

180

Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 1  

Science Conference Proceedings (OSTI)

On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster displays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume I covers information presented at sessions 1 through 4 on systems for the production of Co-products and industrial fuel gas, environmental projects, and components and materials. Individual papers have been processed for the Energy Data Base.

Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J. (eds.)

1987-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Architecture synthesis basis for the Hanford Cleanup system: First issue  

SciTech Connect

This document describes a set of candidate alternatives proposed to accomplish the Hanford Cleanup system functions defined in a previous work. Development of alternatives is part of a sequence of system engineering activities which lead to definition of all the products which, when completed, accomplish the cleanup mission. The alternative set is developed to functional level four or higher depending on need.

Holmes, J.J. [comp.

1994-06-01T23:59:59.000Z

182

DOE Surpasses Cleanup Target Ahead of Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Surpasses Cleanup Target Ahead of Schedule Surpasses Cleanup Target Ahead of Schedule DOE Surpasses Cleanup Target Ahead of Schedule May 12, 2011 - 12:00am Addthis WASHINGTON, D.C. - The U.S. Department of Energy announced today it has surpassed one of the Obama Administration's High Priority Performance Goals five months ahead of schedule in its effort to clean up the legacy of the Cold War. Through a $6 billion American Recovery and Reinvestment Act investment, the Department's cleanup footprint has been reduced by 45 percent, from 931 square miles to 516 square miles. By achieving this reduction, the Department is on track to reduce its overall cleanup footprint by approximately 90 percent by 2015. Footprint reduction lowers costs associated with site surveillance and maintenance and helps protect the

183

DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment Saves Money, Trains Workers, Creates Jobs DOE Surpasses Cleanup Target Ahead of Schedule: Recovery Act Investment Saves Money, Trains Workers, Creates Jobs May 12, 2011 - 12:00pm Addthis Media Contact (202) 586-4940 WASHINGTON, D.C. - The U.S. Department of Energy announced today it has surpassed one of the Obama Administration's High Priority Performance Goals five months ahead of schedule in its effort to clean up the legacy of the Cold War. Through a $6 billion American Recovery and Reinvestment Act investment, the Department's cleanup footprint has been reduced by 45 percent, from 931 square miles to 516 square miles. By achieving this reduction, the Department is on track to reduce its overall cleanup footprint by

184

EM's December Newsletter Recaps Cold War Cleanup Accomplishments in 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM's December Newsletter Recaps Cold War Cleanup Accomplishments EM's December Newsletter Recaps Cold War Cleanup Accomplishments in 2013 EM's December Newsletter Recaps Cold War Cleanup Accomplishments in 2013 December 24, 2013 - 12:00pm Addthis WASHINGTON, D.C. - On Dec. 19, EM completed demolition of the 4.8 million-square-foot Building K-25 at Oak Ridge, a milestone that capped a busy and successful 2013 for the Cold War cleanup program. The demolition was one of EM's most significant achievements this year, and it is captured in this newsletter issue along with dozens of other notable accomplishments across the EM complex. Read about EM's productive year, including cleanup of buildings and waste sites along the Columbia River in Washington state, progress in the disposition of transuranic waste at Idaho and other sites and preparations for a major demolition at the West Valley

185

Idaho Site Advances Recovery Act Cleanup after Inventing Effective  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Advances Recovery Act Cleanup after Inventing Effective Site Advances Recovery Act Cleanup after Inventing Effective Treatment Idaho Site Advances Recovery Act Cleanup after Inventing Effective Treatment For the first time in history, workers at the Idaho site achieved success in the initial cleanup of potentially dangerous sodium in a decommissioned nuclear reactor using an innovative treatment process. The American Recovery and Reinvestment Act invested $70 million in the project, which employs 130 workers. DOE officials cheered the outcome and praised the team that designed and implemented the innovative sodium treatment for which the DOE has filed a provisional patent application. Idaho Site Advances Recovery Act Cleanup after Inventing Effective Treatment More Documents & Publications Experimental Breeder Reactor-II Primary Tank System Wash Water Workshop

186

Physical gas stream cleanup: Technology status report  

SciTech Connect

This report is a summary of the status of particulate control technologies for use at high temperatures and high pressures. The technologies are being developed under the Physical Gas Stream Cleanup Program that is administered by the US Department of Energy, Morgantown Energy Technology Center. The intended uses of the particulate control technologies are to protect components in advanced coal systems, such as integrated gasification combined cycles, pressurized fluidized-bed combustion combined cycles, gasification molten carbonate fuel cells, and direct coal-fueled turbines. The use of particulate control technologies for these advanced energy conversion systems requires separation and collection of particles at temperatures in excess of 1000/sup 0/F and at pressures in excess of 7 atmospheres. These temperature and pressure regimes represent a drastic departure from those of conventional technologies. The Physical Gas Stream Cleanup Program seeks to establish a technical and economic data base that will demonstrate the feasibility of high-temperature, high-pressure particulate control. Particulate control concepts and their corresponding research and development projects are described in this report. These projects include subpilot-scale tests of an electrostatic precipitator, a ceramic cross-flow filter, and a screenless granular-bed filter on a 30-inch diameter pressurized fluidized-bed combustor. Bench-scale tests will also be conducted using a ceramic cross-flow filter, a ceramic bag filter, and an electrostatic precipitator on a 6-inch diameter fluidized-bed gasifier. Additional research involves laboratory evaluation of acoustic agglomeration, turbulence characterization and suppression in cyclones and characterization of ceramic fabrics for bag filters. Each project and significant accomplishments in FY 85 are described. 14 refs., 25 figs., 5 tabs.

1986-04-01T23:59:59.000Z

187

Environmental Compliance Performance | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Compliance » Environmental Compliance » Environmental Compliance Performance Environmental Compliance Performance Most Office of Environmental Management (EM) cleanup is being performed under the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) through Federal Facility Agreements as well as under the Resource Conservation and Recovery Act (RCRA) through various consent orders, agreements, and decrees with states. These agreements and orders identify milestones associated with cleanup actions and dates by which those milestones are to be met. DOE has approximately 40 agreements and orders in place with its State and Federal regulators dealing with EM's cleanup mission. Major enforceable milestones are those which have fixed, mandatory due dates and, in EM's view, represent cleanup progress. EM's senior

188

Integrated Low Emissions Cleanup system for direct coal fueled turbines  

Science Conference Proceedings (OSTI)

The United States Department of.Energy, Morgantown Energy Research Center (DOE/METC), is sponsoring the development of coal-fired turbine technology in the areas of Pressurized Fluidized Bed Combustion, Integrated Gasification Combined Cycles, and Direct Coal-Fired Turbines. A major technical challenge remaining for the development of coal-fired turbine systems is high-temperature gas cleaning to meet environmental standards for sulfur oxides and particulate emissions, as well as to provide acceptable turbine life. The Westinghouse Electric Corporation, Science & Technology Center, is evaluating an Integrated Low Emissions Cleanup (ILEC) concept that has been configured to meet this technical challenge. This ceramic barrier filter, ILEC concept simultaneously controls sulfur, particulate, and alkali contaminants in high-pressure fuel gases or combustion gases, and is considering cleaning temperatures up to 2100{degrees}F. This document describes Phase II of the program, the design, construction, and shakedown of a bench-scale facility to test and confirm the feasibility of this ILEC technology.

Newby, R.A.; Alvin, M.A.; Bachovchin, D.M.; Smeltzer, E.E.; Lippert, T.E.

1993-07-01T23:59:59.000Z

189

Mission & Functions Statement for the Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE))

The mission of the Office of Environmental Management (EM) is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government...

190

Tritium research laboratory cleanup and transition project final report  

Science Conference Proceedings (OSTI)

This Tritium Research Laboratory Cleanup and Transition Project Final Report provides a high-level summary of this project`s multidimensional accomplishments. Throughout this report references are provided for in-depth information concerning the various topical areas. Project related records also offer solutions to many of the technical and or administrative challenges that such a cleanup effort requires. These documents and the experience obtained during this effort are valuable resources to the DOE, which has more than 1200 other process contaminated facilities awaiting cleanup and reapplication or demolition.

Johnson, A.J.

1997-02-01T23:59:59.000Z

191

Proceedings of the seventh annual gasification and gas stream cleanup systems contractors review meeting: Volume 2  

Science Conference Proceedings (OSTI)

On June 16 through 19, 1987, METC sponsored the Seventh Annual Gasification and Gas Stream Cleanup Systems Contractors Review Meeting which was held at the Sheraton Lakeview Conference Center in Morgantown, West Virginia. The primary purpose of the meeting was threefold: to review the technical progress and current status of the gasification and gas stream cleanup projects sponsored by the Department of Energy; to foster technology exchange among participating researchers and other technical communities; to facilitate interactive dialogues which would identify research needs that would make coal-based gasification systems more attractive economically and environmentally. More than 310 representatives of Government, academia, industry, and foreign energy research organizations attended the 4-day meeting. Fifty-three papers and thirty poster dsplays were presented summarizing recent developments in the gasification and gas stream cleanup programs. Volume II covers papers presented at sessions 5 and 6 on system for the production of synthesis gas, and on system for the production of power. All papers have been processed for inclusion in the Energy Data Base.

Ghate, M.R.; Markel, K.E. Jr.; Jarr, L.A.; Bossart, S.J. (eds.)

1987-08-01T23:59:59.000Z

192

Washington, D.C.Abandoned Mine Site Characterization and Cleanup Handbook Contributors  

E-Print Network (OSTI)

(Handbook) is the result of the collective efforts and contributions of a number of individuals. During the earliest days of Handbook development, Mike Bishop of EPA Region 8 lead the effort to develop a Superfund Mine Waste Reference Document for EPA project managers working on mine site cleanup. That effort evolved into the Handbook in recognition of the many regulatory and non-regulatory mechanisms that are used today to manage the characterization and cleanup of mines sites. Users are encouraged to consider the information presented in the Handbook against the backdrop of site specific environmental and regulatory factors. The Handbook has been developed as a source of information and ideas for project managers involved in the characterization and cleanup of inactive mine sites. It is not guidance or policy. The list that follows acknowledges the efforts of writers, reviewers, editors, and other contributors that made development of the Handbook possible. It is always a bit risky to develop a list of contributors because it is inevitable

Attn Of; Nick Ceto; Shahid Mahmud; Fred Macmillan; Brad Bradley; Shawn Ghose; Mark Doolan; Mike Bishop; Matt Cohn; Carol Russ; Jim Dunn; Elisabeth Evans; Holly Fliniau; Eva Hoffman; Sonya Pennock; Mike Holmes; Andy Lensink; Ken Wangerud; Sara Weinstock; Chris Weis; Patti Collins; Ken Greenberg; Mike Hingerty; Nick Ceto; Bruce Duncan; Earl Liverman; Roseanne Lorenzana; Patty Mcgrath; Don Metheny

2000-01-01T23:59:59.000Z

193

Hazardous waste cleanup at federal facilities: Need for an integrated policy  

SciTech Connect

The U.S. Department of Energy (DOE) has generated and disposed of large volumes of hazardous and radioactive waste as a result of 50 years of nuclear weapons production. DOE is now faced with the problem of remediating its more than 13,000 hazardous waste sites. To be effective for the good of the environment and public health, our nation`s hazardous waste policy must first address several questions: What is the level of risk at federal facilities? (Is remediation really necessary?) Can and should institutional controls be incorporated into the cleanup process? How effective are cleanup technologies? What cleanup standards should be used? What will be done with waste generated during remediation? How do we obtain appropriate stakeholder involvement? Once these questions are answered and a more reliable, predictable policy has been developed, the waste management and environmental restoration program may not be an unwanted drain on America`s pocketbook, and we may have a cleaner country as well.

Travis, C.C. [Oak Ridge National Lab., TN (United States); Ladd, B. [Univ. of Tennessee, Knoxville, TN (United States)

1993-09-22T23:59:59.000Z

194

North Slope (Wahluke Slope) expedited response action cleanup plan  

SciTech Connect

The purpose of this action is to mitigate any threat to public health and the environment from hazards on the North Slope and meet the expedited response action (ERA) objective of cleanup to a degree requiring no further action. The ERA may be the final remediation of the 100-I-3 Operable Unit. A No Action record of decision (ROD) may be issued after remediation completion. The US Department of Energy (DOE) currently owns or administers approximately 140 mi{sup 2} (about 90,000 acres) of land north and east of the Columbia River (referred to as the North Slope) that is part of the Hanford Site. The North Slope, also commonly known as the Wahluke Slope, was not used for plutonium production or support facilities; it was used for military air defense of the Hanford Site and vicinity. The North Slope contained seven antiaircraft gun emplacements and three Nike-Ajax missile positions. These military positions were vacated in 1960--1961 as the defense requirements at Hanford changed. They were demolished in 1974. Prior to government control in 1943, the North Slope was homesteaded. Since the initiation of this ERA in the summer of 1992, DOE signed the modified Hanford Federal Agreement and Consent Order (Tri-Party Agreement) with the Washington Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA), in which a milestone was set to complete remediation activities and a draft closeout report by October 1994. Remediation activities will make the North Slope area available for future non-DOE uses. Thirty-nine sites have undergone limited characterization to determine if significant environmental hazards exist. This plan documents the results of that characterization and evaluates the potential remediation alternatives.

Not Available

1994-02-01T23:59:59.000Z

195

PARTICULATE HOT GAS STREAM CLEANUP TECHNICAL ISSUES  

Science Conference Proceedings (OSTI)

This is the fourth annual report describing the activities performed under Task 1 of Contract No. DE-AC21-94MC31160. The analyses of hot gas stream cleanup (HGCU) ashes and descriptions of filter performance studied under this contract are designed to address problems with filter operation that are apparently linked to characteristics of the collected ash. This work is designed to generate a data base of the key characteristics of ashes collected from operating advanced particle filters and to relate these ash properties to the operation and performance of these filters and their components. This report summarizes characterizations of ash and char samples from pressurized fluidized-bed combustion and gasification facilities. Efforts are under way to develop a method for preserving fragile filter cakes formed on ceramic filter elements. The HGCU data base was formatted for Microsoft Access 97 . Plans for the remainder of the project include characterization of additional samples collected during site visits to the Department of Energy / Southern Company Services Power Systems Development Facility and completion and delivery of the HGCU data base.

None

1999-05-05T23:59:59.000Z

196

PARTICULATE HOT GAS STREAM CLEANUP TECHNICAL ISSUES  

Science Conference Proceedings (OSTI)

This is the fourth annual report describing the activities performed under Task 1 of Contract No. DE-AC21-94MC31160. The analyses of hot gas stream cleanup (HGCU) ashes and descriptions of filter performance studied under this contract are designed to address problems with filter operation that are apparently linked to characteristics of the collected ash. This work is designed to generate a data base of the key characteristics of ashes collected from operating advanced particle filters and to relate these ash properties to the operation and performance of these filters and their components. This report summarizes characterizations of ash and char samples from pressurized fluidized-bed combustion and gasification facilities. Efforts are under way to develop a method for preserving fragile filter cakes formed on ceramic filter elements. The HGCU data base was formatted for Microsoft Access 97 . Plans for the remainder of the project include characterization of additional samples collected during site visits to the Department of Energy / Southern Company Services Power Systems Development Facility and completion and delivery of the HGCU data base.

NONE

1998-11-30T23:59:59.000Z

197

PARTICULATE HOT GAS STREAM CLEANUP TECHNICAL ISSUES  

Science Conference Proceedings (OSTI)

This is the fourth annual report describing the activities performed under Task 1 of Contract No. DE-AC21-94MC31160. The analyses of hot gas stream cleanup (HGCU) ashes and descriptions of filter performance studied under this contract are designed to address problems with filter operation that are apparently linked to characteristics of the collected ash. This work is designed to generate a data base of the key characteristics of ashes collected from operating advanced particle filters and to relate these ash properties to the operation and performance of these filters and their components. This report summarizes characterizations of ash and char samples from pressurized fluidized-bed combustion and gasification facilities. Efforts are under way to develop a method for preserving fragile filter cakes formed on ceramic filter elements. The HGCU data base was formatted for Microsoft Access 97{reg_sign}. Plans for the remainder of the project include characterization of additional samples collected during site visits to the Department of Energy/Southern Company Services Power Systems Development Facility and completion and delivery of the HGCU data base.

NONE

1999-05-05T23:59:59.000Z

198

2006 Department of Energy Strategic Plan - Environmental Responsibility |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2006 Department of Energy Strategic Plan - Environmental 2006 Department of Energy Strategic Plan - Environmental Responsibility 2006 Department of Energy Strategic Plan - Environmental Responsibility The scope of the Department's environmental cleanup includes stabilization and disposition of some of the earth's most hazardous materials generated from spent nuclear fuel and nuclear radioactive waste material. The cleanup program resulting from over five decades of nuclear weapons production and energy research is the largest active cleanup program in the world. In addition, after active cleanup, residual risks will remain for significant periods of time at most DOE cleanup sites. The Department will take appropriate action to protect human health and the environment from these residual risks. The Department continues its effort

199

Oak Ridge Office of Environmental Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Office of Environmental Management Congressional Nuclear Cleanup Caucus Mark Whitney Manager Oak Ridge, TN May 16, 2013 www.energy.govEM 2 EM Program Overview ETTP ORNL...

200

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Counties until it flows into the Savannah River. Government property on both sides of the stream acts as a buffer as it runs through privately-owned property. Completing this project reduces the site's footprint by another 10 percent. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup More Documents & Publications

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

EM Leads Successful Workshop Supporting Fukushima Cleanup | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Successful Workshop Supporting Fukushima Cleanup Successful Workshop Supporting Fukushima Cleanup EM Leads Successful Workshop Supporting Fukushima Cleanup August 8, 2013 - 12:00pm Addthis TOKYO - An EM-led U.S. delegation conducted its third workshop last month to provide expertise to Japanese officials leading the cleanup of the Fukushima Daiichi Nuclear Power Plant site and surrounding area, this time addressing priorities identified by Japan's government agencies. At the request of the Japanese Ministry of Environment (MOE) and Ministry of Economy, Trade and Industry (METI), the delegation's technical experts discussed their experience related to the behavior of radioactive cesium in the environment and other topics. The delegation included representatives from Savannah River, Pacific Northwest, Lawrence Berkeley, Lawrence

202

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup SRS Recovery Act Completes Major Lower Three Runs Project Cleanup American Recovery and Reinvestment Act can now claim that 85 percent of the Savannah River Site (SRS) has been cleaned up with the recent completion of the Lower Three Runs (stream) Project. Twenty miles long, Lower Three Runs leaves the main body of the 310-square mile site and runs through parts of Barnwell and Allendale Counties until it flows into the Savannah River. Government property on both sides of the stream acts as a buffer as it runs through privately-owned property. Completing this project reduces the site's footprint by another 10 percent. SRS Recovery Act Completes Major Lower Three Runs Project Cleanup More Documents & Publications

203

Independent Oversight Activity Report, Idaho Cleanup Project - November  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Independent Oversight Activity Report, Idaho Cleanup Project - Independent Oversight Activity Report, Idaho Cleanup Project - November 2013 Independent Oversight Activity Report, Idaho Cleanup Project - November 2013 November 2013 Pre-restart Visit to the Integrated Waste Treatment Unit by the Defense Nuclear Facilities Safety Board [HIAR-ICP-2013-11-19] This Independent Activity Report documents an oversight activity conducted by the Office of Health, Safety and Security's (HSS) Office of Safety and Emergency Management Evaluations from November 19-22, 2013, at the Integrated Waste Treatment Unit facility of the Idaho Cleanup Project. The activity consisted of the HSS Site Lead touring the newly modified IWTU facility to observe the many process and equipment modifications that have been made since the facility was shut down. In addition, the Site Lead

204

Protecting Recovery Act Cleanup Site During Massive Wildfire | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Protecting Recovery Act Cleanup Site During Massive Wildfire Protecting Recovery Act Cleanup Site During Massive Wildfire Protecting Recovery Act Cleanup Site During Massive Wildfire Effective safety procedures in place at Los Alamos National Laboratory would have provided protections in the event that the raging Las Conchas fire had spread to the site of an American Recovery and Reinvestment Act project. "Our procedures not only placed the waste excavation site, Materials Disposal Area B (MDA-B), into a safe posture so it was well protected during the fire, but also allowed us to resume work quickly," said Project Director Al Chaloupka. Protecting Recovery Act Cleanup Site During Massive Wildfire More Documents & Publications Los Alamos Lab Completes Excavation of Waste Disposal Site Used in the 1940s

205

Independent Oversight Activity Report, Idaho Cleanup Project - November  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Activity Report, Idaho Cleanup Project - Activity Report, Idaho Cleanup Project - November 2013 Independent Oversight Activity Report, Idaho Cleanup Project - November 2013 November 2013 Pre-restart Visit to the Integrated Waste Treatment Unit by the Defense Nuclear Facilities Safety Board [HIAR-ICP-2013-11-19] This Independent Activity Report documents an oversight activity conducted by the Office of Health, Safety and Security's (HSS) Office of Safety and Emergency Management Evaluations from November 19-22, 2013, at the Integrated Waste Treatment Unit facility of the Idaho Cleanup Project. The activity consisted of the HSS Site Lead touring the newly modified IWTU facility to observe the many process and equipment modifications that have been made since the facility was shut down. In addition, the Site Lead

206

WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING CLEANUP  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING CLEANUP WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING CLEANUP December 1, 2009 - 12:00pm Addthis Richland, WA - In direct support of Hanford cleanup and the American Reinvestment and Recovery Act (ARRA) accelerated cleanup initiatives, the U.S. Department of Energy (DOE) Richland Operations Office (RL) is teaming with the Site services contractor, Mission Support Alliance, LLC (MSA), CH2M HILL Plateau Remediation Company and Washington River Protection Services Company to implement a WiMAX-based communications infrastructure at Hanford to augment the existing fiber optic and Wi-Fi-based systems. Wi-Fi and WiMAX are both considered last mile technologies that carry signals from telecommunications backbones (in this case hubs or access

207

Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Progress:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Progress: Recovery Act Funding Allows Demolition of Power Houses Ahead of Schedule Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Progress: Recovery Act Funding Allows Demolition of Power Houses Ahead of Schedule March 4, 2011 - 12:00pm Addthis Media Contacts Cameron Hardy, DOE (509) 376-5365 Cameron.Hardy@rl.doe.gov Andre Armstrong, CHPRC (509) 376-6773 andre_l_armstrong@rl.g RICHLAND, WASH. - Today's safe and successful explosive demolition at Hanford's 200 Area by U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CHPRC) is the latest reminder of progress being made on cleanup as a result of American Recovery and Reinvestment Act investments. "Recovery Act funds allowed us to accelerate the schedule for removing

208

Independent Oversight Assessment, Idaho Cleanup Project Sodium Bearing  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Cleanup Project Sodium Idaho Cleanup Project Sodium Bearing Waste Treatment Project - November 2012 Independent Oversight Assessment, Idaho Cleanup Project Sodium Bearing Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent assessment of nuclear safety culture at the DOE Sodium Bearing Waste Treatment Project (SBWTP). The primary objective of the evaluation was to provide information regarding the status of the safety culture at SBWTP. The data collection phase of the assessment occurred in April and May 2012. SBWTP is one of DOE's largest nuclear

209

Secretary Chu, Governor Gregoire Issue Statement on Hanford Cleanup |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Chu, Governor Gregoire Issue Statement on Hanford Cleanup Chu, Governor Gregoire Issue Statement on Hanford Cleanup Secretary Chu, Governor Gregoire Issue Statement on Hanford Cleanup January 15, 2013 - 7:35pm Addthis News Media Contact (202) 586-4940 WASHINGTON -- U.S. Energy Secretary Steven Chu and Governor Chris Gregoire issued the following joint statement on the cleanup efforts underway at Hanford: "Over the past several months, the Department of Energy and the State of Washington have worked together closely to ensure the Waste Treatment Plant is on a stable path to resolving the technical issues, completing construction, and beginning to treat waste in the coming years. "Based on insight gathered from a number leading scientific experts, the Department is now confident construction activities at the High-Level Waste

210

2012 Congressional Nuclear Cleanup Caucus Briefings | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 Congressional Nuclear Cleanup Caucus Briefings 2 Congressional Nuclear Cleanup Caucus Briefings 2012 Congressional Nuclear Cleanup Caucus Briefings The Congressional Nuclear Cleanup Caucus serves as a way to brief members of Congress and their staff on EM headquarters and site activities, including budget, safety and project progress. 02/16/2012 - FY 2013 Budget Overview 03/07/2012 - Richland Operations Office, WA 03/21/2012 - Oak Ridge, TN 03/22/2012 - Portsmouth/Paducah Project Office, OH-KY 03/27/2012 - Safety Overview with Deputy Assistant Secretary for Safety & Security Program, Matthew Moury 03/28/2012 - Idaho Operations Office, ID 04/18/2012 - Savannah River Site, SC 04/19/2012 - Office of River Protection, WA More Documents & Publications Assistant Secretary Triay's FY 2012 EM Budget Rollout Presentation

211

WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING CLEANUP  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING CLEANUP WIMAX TECHNOLOGY AT HANFORD: UPDATING INFRASTRUCTURE, ACCELERATING CLEANUP December 1, 2009 - 12:00pm Addthis Richland, WA - In direct support of Hanford cleanup and the American Reinvestment and Recovery Act (ARRA) accelerated cleanup initiatives, the U.S. Department of Energy (DOE) Richland Operations Office (RL) is teaming with the Site services contractor, Mission Support Alliance, LLC (MSA), CH2M HILL Plateau Remediation Company and Washington River Protection Services Company to implement a WiMAX-based communications infrastructure at Hanford to augment the existing fiber optic and Wi-Fi-based systems. Wi-Fi and WiMAX are both considered last mile technologies that carry signals from telecommunications backbones (in this case hubs or access

212

Renewable Natural Gas Clean-up Challenges and Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

pipeline tariffs don't typically address all components Methods for treating "raw" biogas can be costly Methods for treating raw biogas can be costly 7 *Post clean-up. Methane...

213

EM SSAB Contributes Community Views to Clean-up Decisions  

Energy.gov (U.S. Department of Energy (DOE))

EM has made public participation a fundamental component of its cleanup mission and has found that the EM SSAB, which draws upon diverse community viewpoints to provide advice and recommendations,...

214

Richland Operations Office Completes Cleanup in Hanford's 300...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

sewer system - was removed from the 300-15 Waste Site in the north section. RICHLAND, Wash. - EM met a Tri-Party Agreement milestone by completing cleanup of the north portion of...

215

Idaho Cleanup Project ships first Recovery Act-funded remote...  

NLE Websites -- All DOE Office Websites (Extended Search)

to clean up the Idaho Site." The Idaho Cleanup Project (ICP) has reactivated a large hot cell, or shielded enclosure, which had been dormant since 1988 at the Idaho Nuclear...

216

Idaho Cleanup Project grows its workforce to complete ARRA work  

NLE Websites -- All DOE Office Websites (Extended Search)

Idaho Cleanup Project grows its workforce to complete ARRA work CWI President and CEO John Fulton greets newly hired ICP employees at a June orientation session in Idaho Falls....

217

Idaho Site Completes Cleanup Milestone Ahead of Schedule  

NLE Websites -- All DOE Office Websites (Extended Search)

News Media Contact: News Media Contact: Erik Simpson (208) 360-0426 For Immediate Release Date: June 23, 2010 Idaho Site Completes Cleanup Milestone Ahead of Schedule Idaho Falls, ID � The Department of Energy�s Idaho Operations Office, through the efforts of its cleanup contractor, CH2M-WG Idaho (CWI), recently reached a key cleanup milestone three weeks ahead of schedule by completing the transfer of nearly 6.6 metric tons of spent nuclear fuel from wet to dry storage. �The transfer of spent nuclear fuel from wet to dry storage represents a major contract milestone completion by CWI, a five year endeavor,� said Jim Cooper, DOE-ID Acting Deputy Manager for the Idaho Cleanup Project. �Completion of this campaign places the spent fuel in a safer configuration for the environment, complies with DOE�s commitment to the

218

Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Progress:  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Progress: Recovery Act Funding Allows Demolition of Power Houses Ahead of Schedule Latest 200 Area Demolition Offers Snapshot of Hanford Cleanup Progress: Recovery Act Funding Allows Demolition of Power Houses Ahead of Schedule March 4, 2011 - 12:00pm Addthis Media Contacts Cameron Hardy, DOE (509) 376-5365 Cameron.Hardy@rl.doe.gov Andre Armstrong, CHPRC (509) 376-6773 andre_l_armstrong@rl.g RICHLAND, WASH. - Today's safe and successful explosive demolition at Hanford's 200 Area by U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CHPRC) is the latest reminder of progress being made on cleanup as a result of American Recovery and Reinvestment Act investments. "Recovery Act funds allowed us to accelerate the schedule for removing

219

New Contract Helps Portsmouth GDP Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Contract Helps Portsmouth GDP Cleanup Contract Helps Portsmouth GDP Cleanup New Contract Helps Portsmouth GDP Cleanup August 18, 2010 - 10:47am Addthis Elizabeth Meckes Elizabeth Meckes Director of User Experience & Digital Technologies, Office of Public Affairs Last week, we took a closer look at the dismantling of the final W62 warhead, a major milestone in the nation's efforts to reduce the amount of nuclear weapons in its stockpile. But after five decades of nuclear weapons production, the Cold War didn't just create a stockpile -- it left 1.5 million cubic meters of solid waste and 88 million gallons of liquid waste. This waste requires treatment and permanent safe storage in gaseous diffusion plants, like the Portsmouth Gaseous Diffusion Plant (GDP) in south-central Ohio. This week, the Department of Energy accelerated Portsmouth GDP cleanup

220

Independent Oversight Assessment, Idaho Cleanup Project Sodium Bearing Waste Treatment Project- November 2012  

Energy.gov (U.S. Department of Energy (DOE))

Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Action Memorandum for General Decommissioning Activities under the Idaho Cleanup Project  

SciTech Connect

This Action Memorandum documents the selected alternative to perform general decommissioning activities at the Idaho National Laboratory (INL) under the Idaho Cleanup Project (ICP). Preparation of this Action Memorandum has been performed in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended by the "Superfund Amendments and Reauthorization Act of 1986", and in accordance with the "National Oil and Hazardous Substances Pollution Contingency Plan". An engineering evaluation/cost analysis (EE/CA) was prepared and released for public comment and evaluated alternatives to accomplish the decommissioning of excess buildings and structures whose missions havve been completed.

S. L. Reno

2006-10-26T23:59:59.000Z

222

ENVIRONMENTAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

797 797 FINAL ENVIRONMENTAL ASSESSMENT FOR DEPARTMENT OF ENERGY LOAN GUARANTEE FOR THE AGUA CALIENTE SOLAR PROJECT IN YUMA COUNTY, ARIZONA U.S. Department of Energy Loan Guarantee Program Office Washington, DC 20585 November 2010 TABLE OF CONTENTS Section Page Executive Summary .................................................................................................................ES-1 Introduction ..........................................................................................................................ES-1 Purpose and Need ...............................................................................................................ES-1 Proposed Action and Alternatives........................................................................................ES-2

223

ORISE: Environmental Assessment and Health Physics  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Assessments and Health Physics Environmental Assessments and Health Physics Performing environmental assessments and independent verification is essential to building public trust and confidence in radiological cleanup. As the U.S. Department of Energy (DOE) and other government agencies target contaminated sites across the country for decontamination and decommissioning, strict guidelines must be followed to ensure that property is effectively remediated before being released for public or private use. Through a combination of environmental assessments, health physics services, and radiochemistry analyses, the Oak Ridge Institute for Science and Education (ORISE) performs independent environmental assessment and verification at DOE cleanup sites across the country. ORISE applies its

224

Transition of the U.S. Department of Energy Fernald Closure Project (FCP) from Cleanup to Legacy Management  

Science Conference Proceedings (OSTI)

The Fernald Closure Project encompasses a 1,050-acre tract of land northwest of Cincinnati, Ohio. Dedicated to the production of uranium feed materials from 1952 until 1989, the site was subsequently included on the U.S. Environmental Protection Agency's National Priorities List and slated for cleanup. Except for contaminated ground water, cleanup of the site will be completed in 2006; remediation of the aquifer will continue for 20 years. Transition of the project from the U.S. Department of Energy Office of Environmental Management to the Office of Legacy Management will be effected when site cleanup is completed, surface restoration is complete, and aquifer remediation is on-going. Office of Legacy Management activities will focus on the monitoring and maintenance of the on-site disposal facility, enforcement of restrictions on site access and use, and the protection of natural and cultural resources. The Site Transition Plan, developed in accordance with Site Transition Framework guidance, identifies organizational and financial responsibilities for attaining closeout. A Transition Matrix details more than 1,000 activities necessary for site transition and allows each task to be tracked. Responsibility Transition Plans address major areas of scope to be transferred, such as records and information management, infrastructure, and environmental monitoring. Much effort has been placed on the retention of staff to perform the identified Office of Legacy Management scope. (authors)

Powell, J. [U.S. Department of Energy, Office of Legacy Management, 11003 Hamilton-Cleves Highway, Ross, OH 45061 (United States); Craig, J.R. [U.S. Department of Energy, Office of Legacy Management, Bruceton, PA (United States); Jacobson, C. [S.M. Stoller Corporation, 2597 B3/4 Road Grand Junction, CO 81503 (United States)

2006-07-01T23:59:59.000Z

225

Richland Operations Office Completes Cleanup in Hanford's 300 Area North  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Richland Operations Office Completes Cleanup in Hanford's 300 Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section March 28, 2013 - 12:00pm Addthis An aerial view of Hanford’s 300 Area North Section following completion of cleanup. An aerial view of Hanford's 300 Area North Section following completion of cleanup. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. More than 8,000 feet of pipe — part of the 300 Area’s process sewer system — was removed from the 300-15 Waste Site in the north section. More than 8,000 feet of pipe - part of the 300 Area's process sewer

226

Richland Operations Office Completes Cleanup in Hanford's 300 Area North  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Richland Operations Office Completes Cleanup in Hanford's 300 Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section Richland Operations Office Completes Cleanup in Hanford's 300 Area North Section March 28, 2013 - 12:00pm Addthis An aerial view of Hanford’s 300 Area North Section following completion of cleanup. An aerial view of Hanford's 300 Area North Section following completion of cleanup. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. Workers demolish the 384 Building, known as the Power House and Heating Plant, in the north portion of the 300 Area. More than 8,000 feet of pipe — part of the 300 Area’s process sewer system — was removed from the 300-15 Waste Site in the north section. More than 8,000 feet of pipe - part of the 300 Area's process sewer

227

High Flux Beam Reactor | Environmental Restoration Projects | BNL  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental Protection Division Environmental Protection Division Home Reactor Projects Celebrating DOE's Cleanup Accomplishments (PDF) Brookhaven Graphite Research Reactor(BGRR) BGRR Overview BGRR Complex Description Decommissioning Decision BGRR Complex Cleanup Actions BGRR Documents BGRR Science & Accomplishments High Flux Beam Reactor (HFBR) HFBR Overview HFBR Complex Description Decommissioning Decision HFBR Complex Cleanup Actions HFBR Documents HFBR Science & Accomplishments Groundwater Protection Group Environmental Protection Division Contact > See also: HFBR Science & Accomplishments High Flux Beam Reactor Under the U.S. Department of Energy (DOE), the High Flux Beam Reactor (HFBR) at Brookhaven National Laboratory (BNL) underwent stabilization and partial decommissioning to prepare the HFBR confinement for long-term safe

228

Surface and Soil Cleanup at Brookhaven National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Surface and Soil Projects Surface and Soil Projects placeholder Aerial view of capped landfills A major part of the overall site cleanup involved addressing contaminated soils, underground tanks, and waste storage areas. All of the major soil projects have now been completed, with the exception of some soils that will need to be cleaned up during the decommissioning of the Brookhaven Graphite Research Reactor and High Flux Beam Reactor. Following are a list of major surface and soil cleanup projects that have been completed since 1994: Three out-of-service 100,000 gallon aboveground waste tanks were removed and disposed of at a licensed off-site disposal facility. Sixteen underground storage tanks (USTs) were removed between 1988 and 2005 under the cleanup program. The project included the removal, transportation, and disposal of the tanks and approximately 4,000 cubic yards of soil and debris.

229

DOE Achieves Second TRU Waste Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Achieves Second TRU Waste Cleanup Achieves Second TRU Waste Cleanup DOE Achieves Second TRU Waste Cleanup October 6, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. -The U.S. Department of Energy has successfully removed all legacy contact-handled transuranic (TRU) waste from the Argonne National Laboratory (ANL), near Chicago, Illinois. In September, all legacy TRU waste was removed from the Bettis Atomic Power Laboratory (BAPL), near Pittsburgh, Pennsylvania. Maintained by the DOE, ANL is the country's first science and engineering research national laboratory. This milestone was supported by $83,000 provided to the National Transuranic Waste Program as part of a $172 million American Recovery and Reinvestment Act investment to expedite legacy TRU waste disposal activities across the DOE complex.

230

Moab Uranium Mill Tailings Cleanup Project Steps into Spotlight at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Uranium Mill Tailings Cleanup Project Steps into Spotlight at Uranium Mill Tailings Cleanup Project Steps into Spotlight at International Meeting in Vienna Moab Uranium Mill Tailings Cleanup Project Steps into Spotlight at International Meeting in Vienna October 22, 2012 - 12:00pm Addthis Moab Federal Project Director Donald Metzler presents at the Uranium Mining Remediation Exchange Group meeting in Germany in September 2011. Moab Federal Project Director Donald Metzler presents at the Uranium Mining Remediation Exchange Group meeting in Germany in September 2011. Moab Federal Project Director Donald Metzler Moab Federal Project Director Donald Metzler Moab Federal Project Director Donald Metzler presents at the Uranium Mining Remediation Exchange Group meeting in Germany in September 2011. Moab Federal Project Director Donald Metzler

231

Hanford Achieves a Cleanup First | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Achieves a Cleanup First Achieves a Cleanup First Hanford Achieves a Cleanup First September 1, 2012 - 12:00pm Addthis F Reactor during operations in 1956. F Reactor during operations in 1956. F Reactor Area in July 2012. F Reactor Area in July 2012. A worker cuts and drains pipe at a waste site in F Area. The pipe contained sodium dichromate, which was used as an anti-corrosion agent. A worker cuts and drains pipe at a waste site in F Area. The pipe contained sodium dichromate, which was used as an anti-corrosion agent. An excavator scoops out a section of river outfall pipeline at an F Area waste site. The pipeline was used to discharge effluent into the Columbia River. An excavator scoops out a section of river outfall pipeline at an F Area waste site. The pipeline was used to discharge effluent into the Columbia

232

Hanford Groundwater Contamination Areas Shrink as EM Exceeds Cleanup Goals  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Groundwater Contamination Areas Shrink as EM Exceeds Groundwater Contamination Areas Shrink as EM Exceeds Cleanup Goals Hanford Groundwater Contamination Areas Shrink as EM Exceeds Cleanup Goals June 26, 2013 - 12:00pm Addthis The 200 West Pump and Treat System is Hanford’s largest facility for treating contaminated groundwater. The 200 West Pump and Treat System is Hanford's largest facility for treating contaminated groundwater. A graphic showing the 200 West Pump and Treat plumes and well network. A graphic showing the 200 West Pump and Treat plumes and well network. The 200 West Pump and Treat System is Hanford's largest facility for treating contaminated groundwater. A graphic showing the 200 West Pump and Treat plumes and well network. RICHLAND, Wash. - Workers supporting groundwater cleanup for EM's

233

Massive Soil Cleanup Effort Concludes at Hanford - Recovery Act Funding  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Massive Soil Cleanup Effort Concludes at Hanford - Recovery Act Massive Soil Cleanup Effort Concludes at Hanford - Recovery Act Funding Pays for Safe Disposal of 20,000 Truckloads of Soil Massive Soil Cleanup Effort Concludes at Hanford - Recovery Act Funding Pays for Safe Disposal of 20,000 Truckloads of Soil August 11, 2011 - 12:00pm Addthis Media Contacts Andre Armstrong, CH2M HILL Andre_L_Armstrong@rl.gov 509-376-6773 Geoff Tyree, DOE Geoffrey.Tyree@rl.doe.gov 509-376-4171 RICHLAND, Wash. - U.S. Department of Energy contractor CH2M HILL Plateau Remediation Company removed nearly half a million tons of contaminated soil over the last two years using American Recovery and Reinvestment Act funding at the Hanford Site in southeast Washington State. Workers shipped more than 20,000 truckloads of contaminated soil excavated

234

Mercury cleanup efforts intensify | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Mercury cleanup efforts ... Mercury cleanup efforts ... Mercury cleanup efforts intensify Posted: February 11, 2013 - 3:31pm | Y-12 Report | Volume 9, Issue 2 | 2013 Millions of pounds of mercury were required to support Y-12's post-World War II mission of separating lithium isotopes. Cleaning up the toxic heavy metal poses many challenges, but what Y-12 is learning could help conquer mercury pollution worldwide. There's a reason you won't find mercury in many thermometers these days. Mercury is a heavy metal that occurs in several chemical forms, all of which can produce toxic effects in high enough doses. Mercury was used in the column exchange process, which Y-12 employed to produce lithium-6 from 1953 to 1962. Through process spills, system leaks and surface runoff, some 700,000 pounds of mercury have been lost to the

235

Report for EM-Initiated Program Supporting Cleanup is Available |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Report for EM-Initiated Program Supporting Cleanup is Available Report for EM-Initiated Program Supporting Cleanup is Available Report for EM-Initiated Program Supporting Cleanup is Available September 4, 2013 - 12:00pm Addthis An Akuna-generated figure of the Savannah River F-Basin site showing the distribution of surface structures, well, contaminate plume and lithofacies. An Akuna-generated figure of the Savannah River F-Basin site showing the distribution of surface structures, well, contaminate plume and lithofacies. Modeled spatial distribution of technicium-99 after the releases from the BC cribs on the Hanford Central Plateau using VisIt software. Modeled spatial distribution of technicium-99 after the releases from the BC cribs on the Hanford Central Plateau using VisIt software. An Akuna-generated figure of the Savannah River F-Basin site showing the distribution of surface structures, well, contaminate plume and lithofacies.

236

EM Delegation Tours UK Cleanup Program's Sellafield Site | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM Delegation Tours UK Cleanup Program's Sellafield Site EM Delegation Tours UK Cleanup Program's Sellafield Site EM Delegation Tours UK Cleanup Program's Sellafield Site May 13, 2013 - 12:00pm Addthis Front row, left to right, NuVision Engineering Vice President Laurie Judd, EM Lead International Affairs Specialist Ana Han, EM Associate Principal Deputy Assistant Secretary Alice Williams and United Kingdom Nuclear Decommissioning Authority (NDA) Head of International Relations John Mathieson; back row, left to right, NDA Sellafield Site Deputy Head Graham Jonsson and EM Deputy Assistant Secretary for Tank Waste and Nuclear Material Management Ken Picha. Front row, left to right, NuVision Engineering Vice President Laurie Judd, EM Lead International Affairs Specialist Ana Han, EM Associate Principal Deputy Assistant Secretary Alice Williams and United Kingdom Nuclear

237

DOE Achieves Second TRU Waste Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Achieves Second TRU Waste Cleanup Achieves Second TRU Waste Cleanup DOE Achieves Second TRU Waste Cleanup October 6, 2011 - 12:00pm Addthis Media Contact Deb Gill www.wipp.energy.gov 575-234-7270 CARLSBAD, N.M. -The U.S. Department of Energy has successfully removed all legacy contact-handled transuranic (TRU) waste from the Argonne National Laboratory (ANL), near Chicago, Illinois. In September, all legacy TRU waste was removed from the Bettis Atomic Power Laboratory (BAPL), near Pittsburgh, Pennsylvania. Maintained by the DOE, ANL is the country's first science and engineering research national laboratory. This milestone was supported by $83,000 provided to the National Transuranic Waste Program as part of a $172 million American Recovery and Reinvestment Act investment to expedite legacy TRU waste disposal activities across the DOE complex.

238

Paducah Site Undergoing Steady Groundwater Cleanup with Variety of Methods  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Undergoing Steady Groundwater Cleanup with Variety of Site Undergoing Steady Groundwater Cleanup with Variety of Methods Paducah Site Undergoing Steady Groundwater Cleanup with Variety of Methods June 1, 2012 - 12:00pm Addthis The yellow outline depicts an area southeast of the C-400 Cleaning Building, background, where electrical resistance heating will be used to remove trichloroethene (TCE) down to 60 feet below ground. Electrodes will heat the chemical into a vapor that can be pumped to the surface and treated in the white structure, center. The yellow outline depicts an area southeast of the C-400 Cleaning Building, background, where electrical resistance heating will be used to remove trichloroethene (TCE) down to 60 feet below ground. Electrodes will heat the chemical into a vapor that can be pumped to the surface and

239

EM Delegation Tours UK Cleanup Program's Sellafield Site | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Tours UK Cleanup Program's Sellafield Site Tours UK Cleanup Program's Sellafield Site EM Delegation Tours UK Cleanup Program's Sellafield Site May 13, 2013 - 12:00pm Addthis Front row, left to right, NuVision Engineering Vice President Laurie Judd, EM Lead International Affairs Specialist Ana Han, EM Associate Principal Deputy Assistant Secretary Alice Williams and United Kingdom Nuclear Decommissioning Authority (NDA) Head of International Relations John Mathieson; back row, left to right, NDA Sellafield Site Deputy Head Graham Jonsson and EM Deputy Assistant Secretary for Tank Waste and Nuclear Material Management Ken Picha. Front row, left to right, NuVision Engineering Vice President Laurie Judd, EM Lead International Affairs Specialist Ana Han, EM Associate Principal Deputy Assistant Secretary Alice Williams and United Kingdom Nuclear

240

Groundwater Cleanup Progresses at Paducah Site | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cleanup Progresses at Paducah Site Cleanup Progresses at Paducah Site Groundwater Cleanup Progresses at Paducah Site October 30, 2013 - 12:00pm Addthis Workers drill holes for installation of electrodes as part of a heating system to help clean up contamination. Workers drill holes for installation of electrodes as part of a heating system to help clean up contamination. A crane lifts the carbon treatment system into place. This technology treats vapor pumped to the surface by the belowground heating system. A crane lifts the carbon treatment system into place. This technology treats vapor pumped to the surface by the belowground heating system. The belowground heating system operates in front of the C-400 Cleaning Building. The belowground heating system operates in front of the C-400 Cleaning

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Summer Fellow Explores EM's Cold War Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summer Fellow Explores EM's Cold War Cleanup Summer Fellow Explores EM's Cold War Cleanup Summer Fellow Explores EM's Cold War Cleanup November 26, 2013 - 12:00pm Addthis Maine Maritime Academy senior Jared Woods learned about nuclear waste management issues at EM. Maine Maritime Academy senior Jared Woods learned about nuclear waste management issues at EM. WASHINGTON, D.C. - Jared Woods graduates from the Maine Maritime Academy (MMA) next month with the experience of an adventurous summer as a fellow in the DOE Scholars Program, an opportunity to explore the agency's careers and learn about its mission and operations. Assigned to EM's Washington, D.C. headquarters, Woods gained knowledge about nuclear safety and waste treatment under the guidance of EM Office of Safety Management Director Todd Lapointe, who graduated from MMA in 1987.

242

Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces the Risk along the Columbia River Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces the Risk along the Columbia River September 13, 2012 - 12:00pm Addthis Media Contacts Cameron Salony, DOE Cameron.Salony@rl.doe.gov 509-376-0402 Dee Millikin, CH2M HILL Plateau Remediation Company Dee_Millikin@rl.gov 509-376-1297 RICHLAND, WASH. - The U.S. Department of Energy (DOE) and contractor CH2M HILL Plateau Remediation Company (CH2M HILL) announced today the removal of the first phase of highly radioactive sludge from under water storage in the K West Basin about 400 yards away from the Columbia River. "This is a major step forward in protecting the river and a historic

243

Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces the Risk along the Columbia River Highly Radioactive Sludge Removal Complete: Historic Cleanup Effort Reduces the Risk along the Columbia River September 13, 2012 - 12:00pm Addthis Media Contacts Cameron Salony, DOE Cameron.Salony@rl.doe.gov 509-376-0402 Dee Millikin, CH2M HILL Plateau Remediation Company Dee_Millikin@rl.gov 509-376-1297 RICHLAND, WASH. - The U.S. Department of Energy (DOE) and contractor CH2M HILL Plateau Remediation Company (CH2M HILL) announced today the removal of the first phase of highly radioactive sludge from under water storage in the K West Basin about 400 yards away from the Columbia River. "This is a major step forward in protecting the river and a historic

244

Summer Fellow Explores EM's Cold War Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summer Fellow Explores EM's Cold War Cleanup Summer Fellow Explores EM's Cold War Cleanup Summer Fellow Explores EM's Cold War Cleanup November 26, 2013 - 12:00pm Addthis Maine Maritime Academy senior Jared Woods learned about nuclear waste management issues at EM. Maine Maritime Academy senior Jared Woods learned about nuclear waste management issues at EM. WASHINGTON, D.C. - Jared Woods graduates from the Maine Maritime Academy (MMA) next month with the experience of an adventurous summer as a fellow in the DOE Scholars Program, an opportunity to explore the agency's careers and learn about its mission and operations. Assigned to EM's Washington, D.C. headquarters, Woods gained knowledge about nuclear safety and waste treatment under the guidance of EM Office of Safety Management Director Todd Lapointe, who graduated from MMA in 1987.

245

Idaho Site Obtains Patent for Nuclear Reactor Sodium Cleanup Treatment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Obtains Patent for Nuclear Reactor Sodium Cleanup Obtains Patent for Nuclear Reactor Sodium Cleanup Treatment Idaho Site Obtains Patent for Nuclear Reactor Sodium Cleanup Treatment March 28, 2013 - 12:00pm Addthis CWI engineers Jeff Jones, David Tolman, right, and Kirk Dooley (seated) developed a treatment to safely dissolve a bicarbonate crust and treat and remove the sodium in the Experimental Breeder Reactor-II at the Idaho site. CWI engineers Jeff Jones, David Tolman, right, and Kirk Dooley (seated) developed a treatment to safely dissolve a bicarbonate crust and treat and remove the sodium in the Experimental Breeder Reactor-II at the Idaho site. Piping in the east boiler basement of the sodium processing building was color coded for easy identification. Orange indicates sodium and green identifies cooling water.

246

Recovery Act Invests in Cleanup, Preservation of Hanford Site Locomotives,  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Invests in Cleanup, Preservation of Hanford Site Invests in Cleanup, Preservation of Hanford Site Locomotives, Railcars Recovery Act Invests in Cleanup, Preservation of Hanford Site Locomotives, Railcars With the help of the American Recovery and Reinvestment Act, the Hanford Site is preserving the history of its locomotives and railcars as workers clean up the legacy of the Cold War. In the recently completed railcar project – a $5.5 million effort funded by the Recovery Act – the Richland Operations Office and its contractors moved two locomotives and two cask cars onto reclaimed track at the B Reactor for permanent public display. Designated a National Historic Landmark in August 2008, the B Reactor is slated to become part of the national park system commemorating the Manhattan Project and is open for

247

Idaho Site Obtains Patent for Nuclear Reactor Sodium Cleanup Treatment |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Site Obtains Patent for Nuclear Reactor Sodium Cleanup Idaho Site Obtains Patent for Nuclear Reactor Sodium Cleanup Treatment Idaho Site Obtains Patent for Nuclear Reactor Sodium Cleanup Treatment March 28, 2013 - 12:00pm Addthis CWI engineers Jeff Jones, David Tolman, right, and Kirk Dooley (seated) developed a treatment to safely dissolve a bicarbonate crust and treat and remove the sodium in the Experimental Breeder Reactor-II at the Idaho site. CWI engineers Jeff Jones, David Tolman, right, and Kirk Dooley (seated) developed a treatment to safely dissolve a bicarbonate crust and treat and remove the sodium in the Experimental Breeder Reactor-II at the Idaho site. Piping in the east boiler basement of the sodium processing building was color coded for easy identification. Orange indicates sodium and green identifies cooling water.

248

ENVIRONMENTAL MANAGEMENT SITE SPECIFIC ADVISORY BOARD  

NLE Websites -- All DOE Office Websites (Extended Search)

DEPARTMENT OF ENERGY DEPARTMENT OF ENERGY ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD (EM SSAB) Savannah River Site Application No. (Please leave blank) ______________ MEMBERSHIP APPLICATION ________________________________________________________________________________________________ The EM SSAB provides meaningful opportunity for collaborative dialogue among the diverse communities at the Department of Energy (DOE) Environmental Management (EM) clean-up sites. At the request of the Assistant Secretary or the Site Manager/Assistant Manager for Environmental Management, the Board provides advice and recommendations concerning the following EM site-specific issues: clean-up standards and environmental restoration; waste management and disposition; stabilization and disposition of non-stockpile nuclear materials;

249

Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

UNITED STATES DEPARTMENT OF UNITED STATES DEPARTMENT OF ENERGY Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On- going Mission Sites February 2012 Introduction Long-term stewardship (LTS) includes the physical controls, institutions, information, and other mechanisms needed to ensure protection of people and the environment at sites where the U.S. Department of Energy (DOE) has completed or plans to complete cleanup (e.g., landfill closures, remedial actions, removal actions, and facility stabilization). This concept includes land-use controls, information management, monitoring and maintenance. DOE has ongoing mission areas related to advancing energy and nuclear security, promoting scientific discovery and innovation, and ensuring environmental responsibility

250

Environmental Management FY 2006 Budget Request DRAFT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Transportation - Key to Transportation - Key to EM Success Presented to the Transportation External Coordination Working Group July 24, 2007 James Rispoli, Assistant Secretary Office of Environmental Management Solving Cleanup Challenges Through Risk Reduction 2 Solving Cleanup Challenges Through Risk Reduction ● EM's mission is the safe and successful cleanup of the Cold War legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research and includes:  Over 80 million gallons of radioactive liquid waste - the volume equivalent of 121 Olympic-size swimming pools  More than two thousand tons of spent nuclear fuel - roughly equal to the weight of 1,175 Toyota Camrys

251

C-340 Complex D&D Final Lessons Learned (Post CD-4), Environmental...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

C-340 Complex D&D Final Lessons Learned (Post CD-4), Environmental Management Cleanup, Sep 2011 C-340 Complex D&D Final Lessons Learned (Post CD-4), Environmental Management...

252

Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Process upon Completion of the Cleanup Mission: Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) DOE's internal site transition process for Cleanup to long-term stewardship, post-cleanup, and post-closure has been established in transition guidance for sites that will transfer to a Landlord Program Secretarial Office or to Legacy Management for long-term stewardship. Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet (September 2013) More Documents & Publications Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Site Transition Process Upon Cleanup Completion EM SSAB Conference Calls - January 27, 2011

253

West Valley Site History, Cleanup Status, and Role of the West...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

West Valley Site History, Cleanup Status, and Role of the West Valley Citizen Task Force West Valley Site History, Cleanup Status, and Role of the West Valley Citizen Task Force...

254

DOE Update on USEC Cleanup, R&D, and Loan Guarantee Application...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE Update on USEC Cleanup, R&D, and Loan Guarantee Application DOE Update on USEC Cleanup, R&D, and Loan Guarantee Application October 15, 2009 - 12:00am Addthis WASHINGTON, DC -...

255

Idaho Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Governor Praises DOE, Contractor Effort for Resuming Critical Idaho Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup Project Idaho Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup Project July 30, 2013 - 12:00pm Addthis Idaho Governor C.L. “Butch” Otter discusses the importance of completing the cleanup mission at the Idaho site. Idaho Governor C.L. "Butch" Otter discusses the importance of completing the cleanup mission at the Idaho site. An exterior view of the recently constructed Accelerated Retrieval Project-VIII facility. An exterior view of the recently constructed Accelerated Retrieval Project-VIII facility. The Accelerated Retrieval Project-VIII building spans a 1.72-acre footprint. More than 2 million pounds of structural steel went into building. The eastern and largest portion of the structure is 250 feet long by 290 feet wide and 70 feet tall. The one-of-a-kind design consists of a center column-supported space frame connecting each side of the facility’s roof trusses.

256

NETL: Gasification Systems - Integrated Warm Gas Multicontaminant Cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

Integrated Warm Gas Multicontaminant Cleanup Technologies for Coal-Derived Syngas Integrated Warm Gas Multicontaminant Cleanup Technologies for Coal-Derived Syngas Project Number: DE-FC26-05NT42459 Integrated Warm Gas Multicontaminant Cleanup Technologies for Coal-Derived Syngas Project ID: DE-FC26-05NT42459 Objective: The objective is to develop a warm multi-contaminant syngas cleaning system for operation between 300 and 700° F. This project will continue development of the RTI warm syngas cleanup technology suite. Based on the field testing results with real syngas from Eastman Chemical Company's gasifier under DOE Contract DE-AC26-99FT40675, additional technical issues need to be addressed to move the technologies used in warm syngas cleaning further towards commercial deployment especially for chemical/fuels production. These issues range from evaluation of startup and standby options for the more developed desulfurization processes to integration and actual pilot plant testing with real coal-derived syngas for the technologies that were tested at bench scale during Phase I. Development shall continue of the warm gas syngas cleaning technology platform through a combination of lab-scale R&D and larger integrated pilot plant testing with real coal-derived syngas as well as process/systems analysis and simulation for optimization of integration and intensification.

257

Idaho Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Governor Praises DOE, Contractor Effort for Resuming Critical Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup Project Idaho Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup Project July 30, 2013 - 12:00pm Addthis Idaho Governor C.L. “Butch” Otter discusses the importance of completing the cleanup mission at the Idaho site. Idaho Governor C.L. "Butch" Otter discusses the importance of completing the cleanup mission at the Idaho site. An exterior view of the recently constructed Accelerated Retrieval Project-VIII facility. An exterior view of the recently constructed Accelerated Retrieval Project-VIII facility. The Accelerated Retrieval Project-VIII building spans a 1.72-acre footprint. More than 2 million pounds of structural steel went into building. The eastern and largest portion of the structure is 250 feet long by 290 feet wide and 70 feet tall. The one-of-a-kind design consists of a center column-supported space frame connecting each side of the facility’s roof trusses.

258

The Application of NEPA to CERCLA Cleanups  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dcpart.meDlo[ Dcpart.meDlo[ J)JSticc :~ ~ - Emrironment~ndNatural Resources Division Auut4l,JI Antmlt';,l' GrlJrrol WttSlrills;lIm, 1.1- C 20530 January 23, '~,995 MEMORANDUM TO: Steven Herman, EPA 'Jean Nelson, EPA Scott'Fulton, EPA Geoffrey Garver, EPA Robert Nprdhaus, DOE Mary Arine SuI 1 i van, 'DOE E~len Livingston Behan, DOE Katie McGinty;. CEQ , Ray Clark, CEQ Elisabeth Blaug., CEQ .Sherri Wasserman Goodman, DDD Patricia Rivers, DDD FROM: ,{'0:' Lois J. Schiffer Assistant Attorney General EnvLrcmment & Natural Resources Division SU~~CT: Agreed to Repor~ of March 31, 1994 ~eeting Regarding The Applicationof NEPA t.o CERCLA CJ..eanu'ps On Ma~ch 31, 1994~ officiatsfromthe Departrnentof Energy ,(DOE). the Environmental Protection Age.ncy (EPA), and the Council on Environmental Quality (CEQ) met with then Acting Assistant 'Attorney General Lois Schiffer and other representatives

259

The Application of NEPA to CERCLA Cleanups  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Dcpart.meDlo[ Dcpart.meDlo[ J)JSticc :~ ~ - Emrironment~ndNatural Resources Division Auut4l,JI Antmlt';,l' GrlJrrol WttSlrills;lIm, 1.1- C 20530 January 23, '~,995 MEMORANDUM TO: Steven Herman, EPA 'Jean Nelson, EPA Scott'Fulton, EPA Geoffrey Garver, EPA Robert Nprdhaus, DOE Mary Arine SuI 1 i van, 'DOE E~len Livingston Behan, DOE Katie McGinty;. CEQ , Ray Clark, CEQ Elisabeth Blaug., CEQ .Sherri Wasserman Goodman, DDD Patricia Rivers, DDD FROM: ,{'0:' Lois J. Schiffer Assistant Attorney General EnvLrcmment & Natural Resources Division SU~~CT: Agreed to Repor~ of March 31, 1994 ~eeting Regarding The Applicationof NEPA t.o CERCLA CJ..eanu'ps On Ma~ch 31, 1994~ officiatsfromthe Departrnentof Energy ,(DOE). the Environmental Protection Age.ncy (EPA), and the Council on Environmental Quality (CEQ) met with then Acting Assistant 'Attorney General Lois Schiffer and other representatives

260

DOE Awards Small Business Contracts for Recovery Act Cleanup Work at  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Awards Small Business Contracts for Recovery Act Cleanup Work at DOE�s Idaho Site August 2, 2010 Media contact: Brad Bugger, (208) 526-0833 Cincinnati � The Department of Energy Office of Environmental Management (EM) has awarded two small business contracts for work at the Department of Energy�s Idaho Site funded under the American Recovery and Reinvestment Act. North Wind Services, LLC, Idaho Falls, Idaho, was awarded a $14 million construction contract and TerranearPMC, LLC, of Exton, Pennsylvania, is awarded a $2 million cleanup contract. North Wind Services and TerranearPMC are both certified small businesses under the U.S. Small Business Administration. North Wind Services, LLC, an Alaskan Native Owned Corporation was contracted to procure and construct a retrieval enclosure and ancillary structures designated as Accelerated Retrieval Project VII (ARP VII) over Pit 10 West at the Radioactive Waste Management Complex. These facilities will function as a weather protection enclosure and minimize the spread of contamination during buried waste excavation, retrieval and packaging operations. This contract is from July 30, 2010 through September 30, 2011.

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Does the community really matter? : civic environmentalism in brownfield redevelopment  

E-Print Network (OSTI)

This paper analyzes the process of civic environmentalism in brownfield redevelopment. A single "best case" scenario, the Empire Laundry project in Lynn, Massachusetts, illustrates key features of a citizen-led cleanup and ...

Emison, Abigail Harrison

2006-01-01T23:59:59.000Z

262

Accelerating Cleanup: Focus on 2006. Discussion draft  

SciTech Connect

This executive summary addresses the activities associated with the National Transuranic (TRU) Program managed by the Carlsbad Area Office (CAO). The CAO programmatically reports to the Assistant Secretary for Environmental Management and receives administrative support through the Albuquerque Operations Office. The mission of the Carlsbad Area Office (CAO) is to protect human health and the environment by opening and operating the Waste Isolation Pilot Plant for site disposal of TRU waste and by establishing an effective system for management of TRU waste from generation to disposal. It includes personnel assigned to the CAO, the Waste Isolation Pilot Plant (WIPP) site operations, and other activities associated with the National TRU Program. The CAO develops and directs implementation of the program, while the DOE Headquarters establishes policy and guidelines. The CAO assesses compliance with the program guidance, as well as the commonality of activities and assumptions among all the sites. Since the development of the February 28, 1997, database used to develop this Discussion Draft, the opening of the WIPP facility for receipt of Contact Handled waste has been delayed from November 1997 to May 1998. This slippage is significant enough to require a change in the milestones and volumes included in the documents to be reviewed by our stakeholders. Changes have been incorporated into this Discussion Draft and its supporting Project Baseline Summaries (PBSs).

None

1997-06-01T23:59:59.000Z

263

ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ENVIRONMENTAL ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT OFFICE OF EM Recovery NEWS FLASH RECOVERY.GOV March 10, 2011 American Recovery and Reinvestment Act Payments Surge Past $4 Billion U.S. Depar tment of Energy | Office of Environmental Management For More Information on EM Recovery Act Work, Visit Us on the Web: http://www.em.doe.gov/emrecovery/ FINANCIAL HIGHLIGHTS * More than $4 BILLION in Recovery Act payments are accelerating environmental cleanup * 67% of EM Recovery Act funds have been paid Financial data are based on reporting as of March 9, 2011, and are subject to change. EM has made more than $4 billion in Recovery Act payments, or 32 percent of the DOE's $12.4 billion in Recovery Act payments. DOE received $35.2 billion

264

Landfill Gas Cleanup for Carbonate Fuel Cell Power Generation: Final Report  

DOE Green Energy (OSTI)

Landfill gas represents a significant fuel resource both in the United States and worldwide. The emissions of landfill gas from existing landfills has become an environmental liability contributing to global warming and causing odor problems. Landfill gas has been used to fuel reciprocating engines and gas turbines, and may also be used to fuel carbonate fuel cells. Carbonate fuel cells have high conversion efficiencies and use the carbon dioxide present in landfill gas as an oxidant. There are, however, a number of trace contaminants in landfill gas that contain chlorine and sulfur which are deleterious to fuel cell operation. Long-term economical operation of fuel cells fueled with landfill gas will, therefore, require cleanup of the gas to remove these contaminants. The overall objective of the work reported here was to evaluate the extent to which conventional contaminant removal processes could be combined.

Steinfeld, G.; Sanderson, R.

1998-02-01T23:59:59.000Z

265

DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment October 3, 2011 - 12:00pm Addthis DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment CARLSBAD, N.M. - The Waste Isolation Pilot Plant (WIPP) received its

266

DOE Completes Cleanup at New York, California Sites - Recovery Act funds  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Completes Cleanup at New York, California Sites - Recovery Act Completes Cleanup at New York, California Sites - Recovery Act funds accelerate cleanup; support job creation and footprint reduction DOE Completes Cleanup at New York, California Sites - Recovery Act funds accelerate cleanup; support job creation and footprint reduction July 1, 2011 - 12:00pm Addthis Media Contact 202-586-4940 WASHINGTON, D.C. - Last month, the U.S. Department of Energy completed the cleanup of Cold War legacy waste at the Nuclear Radiation Development, LLC (NRD) site near Grand Island, New York, and at the Lawrence Berkeley National Laboratory in Berkeley, California. The two locations became the 18th and 19th sites to be completely cleaned of legacy waste. This milestone was achieved as part of a $172 million investment from the American Recovery and Reinvestment Act to expedite legacy waste cleanup

267

RECOVERY ACT LEADS TO CLEANUP OF TRANSURANIC WASTE SITES | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECOVERY ACT LEADS TO CLEANUP OF TRANSURANIC WASTE SITES RECOVERY ACT LEADS TO CLEANUP OF TRANSURANIC WASTE SITES RECOVERY ACT LEADS TO CLEANUP OF TRANSURANIC WASTE SITES October 1, 2010 - 12:00pm Addthis RECOVERY ACT LEADS TO CLEANUP OF TRANSURANIC WASTE SITES Carlsbad, NM - The recent completion of transuranic (TRU) waste cleanup at Vallecitos Nuclear Center (VNC) and Lawrence Livermore National Laboratory (LLNL) Site 300 in California brings the total number of sites cleared of TRU waste to 17. "Recovery Act funding has made this possible," Carlsbad Field Office (CBFO) Recovery Act Federal Project Director Casey Gadbury said of the VNC and LLNL cleanups funded with about $1.6 million in Recovery Act funds. "The cleanup of these and other small-quantity sites has been and will be accelerated because of the available Recovery Act funds."

268

RECOVERY ACT LEADS TO CLEANUP OF TRANSURANIC WASTE SITES | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

RECOVERY ACT LEADS TO CLEANUP OF TRANSURANIC WASTE SITES RECOVERY ACT LEADS TO CLEANUP OF TRANSURANIC WASTE SITES RECOVERY ACT LEADS TO CLEANUP OF TRANSURANIC WASTE SITES October 1, 2010 - 12:00pm Addthis RECOVERY ACT LEADS TO CLEANUP OF TRANSURANIC WASTE SITES Carlsbad, NM - The recent completion of transuranic (TRU) waste cleanup at Vallecitos Nuclear Center (VNC) and Lawrence Livermore National Laboratory (LLNL) Site 300 in California brings the total number of sites cleared of TRU waste to 17. "Recovery Act funding has made this possible," Carlsbad Field Office (CBFO) Recovery Act Federal Project Director Casey Gadbury said of the VNC and LLNL cleanups funded with about $1.6 million in Recovery Act funds. "The cleanup of these and other small-quantity sites has been and will be accelerated because of the available Recovery Act funds."

269

DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment October 3, 2011 - 12:00pm Addthis DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment DOE ACHIEVES MAJOR COLD WAR LEGACY WASTE CLEANUP MILESTONE: Waste Isolation Pilot Plant Receives 10,000th Shipment CARLSBAD, N.M. - The Waste Isolation Pilot Plant (WIPP) received its

270

Treatment Resin Reduces Costs, Materials in Hanford Groundwater Cleanup -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Treatment Resin Reduces Costs, Materials in Hanford Groundwater Treatment Resin Reduces Costs, Materials in Hanford Groundwater Cleanup - Efficiency delivered more than $6 million in cost savings, $3 million in annual savings Treatment Resin Reduces Costs, Materials in Hanford Groundwater Cleanup - Efficiency delivered more than $6 million in cost savings, $3 million in annual savings June 4, 2013 - 12:00pm Addthis Media Contacts Geoff Tyree, DOE Geoffrey.Tyree@rl.doe.gov (509) 376-4171 Dee Millikin, CHPRC Dee_Millikin@rl.gov (509) 376-1297 RICHLAND, Wash. - U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company is using a treatment material that has delivered more than $6 million in cost savings to date and is delivering more than $3 million in annual cost savings and efficiencies in treatment

271

New Groundwater Treatment Facility Begins Operation: Boost in Cleanup  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Groundwater Treatment Facility Begins Operation: Boost in New Groundwater Treatment Facility Begins Operation: Boost in Cleanup Accelerated by Recovery Act Funding New Groundwater Treatment Facility Begins Operation: Boost in Cleanup Accelerated by Recovery Act Funding January 19, 2011 - 12:00pm Addthis Media Contacts Andre Armstrong, CH2M HILL (509)376-6773 Andre_L_Armstrong@rl.gov Geoff Tyree, DOE (509) 376-4171 Geoffrey.Tyree@rl.doe.gov RICHLAND, WASH. - The U.S. Department of Energy (DOE) is boosting its capacity for treating groundwater to remove chromium near the Columbia River by 40 percent with the recent completion of a new treatment facility. Contractor CH2M HILL Plateau Remediation Company (CH2M HILL) finished building and started operating the new 100-DX groundwater treatment facility in December. The facility is located near the D and DR Reactors on

272

Renewable Natural Gas Clean-up Challenges and Applications  

NLE Websites -- All DOE Office Websites (Extended Search)

Renewable Natural Gas Clean-up Renewable Natural Gas Clean-up p Challenges and Applications Renewable Resource Webinar July 13, 2011 Brian Weeks, Gas Technology Institute 281 235 7993, brian.weeks@gastechnology.org Kristine Wiley, Gas Technology Institute 847 768 0910 kristine wiley@gastechnology org 847 768 0910, kristine.wiley@gastechnology.org 2 Today's Talk Today s Talk >Who is GTI Who is GTI >What is Renewable Natural Gas (RNG) Ch ll f R bl N t l G >Challenges for Renewable Natural Gas >How do we clean up RNG? >Recommendations and Summary 2 - - 3 GTI at a Glance... > Not-for-profit research > Not for profit research, with 65+ year history > Facilities 18 Chi ─ 18 acre campus near Chicago ─ 200,000 ft 2 , 28 specialized labs $60 illi > $60 + million i in revenue

273

Idaho Site Advances Recovery Act Cleanup after Inventing Effective Treatment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

April 14, 2011 April 14, 2011 IDAHO FALLS, Idaho - For the first time in history, workers at the Idaho site achieved success in the initial cleanup of potentially dangerous sodium in a de- commissioned nuclear reactor using an innovative treatment process. The Ameri- can Recovery and Reinvestment Act invested $70 million in the project, which employs 130 workers. DOE officials cheered the outcome and praised the team that designed and imple- mented the innovative sodium treatment for which the DOE has filed a provisional patent application. "We're proud of our team for creating a unique solution to safely rid the Experi- mental Breeder Reactor-II of this highly reactive sodium before we demolish it," DOE Idaho Cleanup Project Assistant Manager Jim Cooper said. "Our workers

274

Criticality safety evaluation for K Area Disassembly Basin cleanup  

SciTech Connect

Preparations are currently being made to remove sludge from the Disassembly Basin in all reactor areas. Because this sludge contains fissile isotopes, it is necessary to perform a criticality safety evaluation for the planned activities. A previous evaluation examined the criticality safety aspects of the sludge removal process for L Area. This document addresses the criticality safety aspects of the K Area Disassembly Basin cleanup work. The K Area Disassembly Basin cleanup will involve, as a first step, pumping the basin sludge into the Monitor Basin portion of the Disassembly Basin. From the Monitor Basin, the sludge will be pumped into tanks or containers for permanent disposition. The criticality safety evaluation discussed in this document covers the transfer of the sludge to the Monitor Basin.

Rosser, M.A.

1994-02-01T23:59:59.000Z

275

DOE Awards Technical Assistance Contract for Moab Mill Tailings Cleanup |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Technical Assistance Contract for Moab Mill Tailings Technical Assistance Contract for Moab Mill Tailings Cleanup DOE Awards Technical Assistance Contract for Moab Mill Tailings Cleanup May 31, 2012 - 12:00pm Addthis Media Contact Bill Taylor bill.taylor@srs.gov 803-952-8564 Cincinnati-The U.S. Department of Energy (DOE) today announced the award of an $18 million small disadvantaged business contract with S&K Aerospace, LLC, of St. Ignatius, Montana to continue to provide technical assistance services for the Moab Uranium Mill Tailings Remedial Action (UMTRA) Project in Moab, Utah. The basic contract is for three years with two one-year options to extend, for a total of up to five years. S&K Aerospace, LLC, a tribal organization 8(a) small business, will assist in the Department's removal of uranium tailings at the former Atlas

276

High Temperature Syngas Cleanup Technology Scale-up  

NLE Websites -- All DOE Office Websites (Extended Search)

RECOVERY ACT: Scale-Up of RECOVERY ACT: Scale-Up of High-Temperature Syngas Cleanup Technology Background Coal gasification generates a synthesis gas (syngas)-predominantly a mixture of carbon monoxide (CO) and hydrogen (H 2 )-that can be used for chemical production of hydrogen, methanol, substitute natural gas (SNG), and many other industrial chemicals, or for electric power generation. Conventional integrated gasification combined cycle (IGCC) power plants use this syngas as a fuel for a combustion

277

The search for the average person - implications for site cleanup  

SciTech Connect

The Yankee Nuclear Power Station is located in Rowe, Massachusetts, on a 2000 acre site. Approximately 10 acres of the site are developed for plant use. Commercial power operation at the 185-MW (electric) plant began in 1961. In February 1992, the decision was made to permanently cease power operations. Decommissioning activities were initiated immediately and are continuing today. Initial dose assessments have been completed to determine the potential extent of the cleanup effort.

Littlefield, P.S.; Cumming, E.R.; Bellini, F.X.

1994-12-31T23:59:59.000Z

278

Savannah River Site Environmental Report for 1998  

Science Conference Proceedings (OSTI)

The mission at the Savannah River Site (SRS) is focused primarily on support of the national defense, nonproliferation, and environmental cleanup. SRS-through its prime operating contractor, Westinghouse Savannah River Company-continues to maintain a comprehensive environmental monitoring program.

Arnett, M.

1999-06-09T23:59:59.000Z

279

DECOMMISSIONING AND ENVRIONMENTAL CLEANUP OF SMALL ARMS TRAINING FACILITY  

SciTech Connect

USDOE performed a (CERCLA) non-time critical removal (NTCR) action at the Small Arms Training Area (SATA) Site Evaluation Area (SEA) located at the Savannah River Site (SRS), in Aiken, South Carolina. From 1951 to May 2010, the SATA was used as a small weapons practice and qualifying firing range. The SATA consisted of 870.1 ha (2,150 ac) of woodlands and open field, of which approximately 2.9 ha (7.3 ac) were used as a firing range. The SATA facility was comprised of three small arms ranges (one static and two interactive), storage buildings for supplies, a weapons cleaning building, and a control building. Additionally, a 113- m (370-ft) long earthen berm was used as a target backstop during live-fire exercises. The berm soils accumulated a large amount of spent lead bullets in the berm face during the facilities 59- years of operation. The accumulation of lead was such that soil concentrations exceeded the U.S. Environmental Protection Agency (USEPA) residential and industrial worker regional screening levels (RSLs). The RSL threshold values are based on standardized exposure scenarios that estimate contaminant concentrations in soil that the USEPA considers protective of humans over a lifetime. For the SATA facility, lead was present in soil at concentrations that exceed both the current residential (400 mg/kg) and industrial (800 mg/kg) RSLs. In addition, the concentration of lead in the soil exceeded the Toxicity Characteristic Leaching Procedure (TCLP) (40 Code of Federal Regulations [CFR] 261.24) regulatory limit. The TCLP analysis simulates landfill conditions and is designed to determine the mobility of contaminants in waste. In addition, a principal threat source material (PTSM) evaluation, human health risk assessment (HHRA), and contaminant migration (CM) analysis were conducted to evaluate soil contamination at the SATA SEA. This evaluation determined that there were no contaminants present that constitute PTSM and the CM analysis revealed that no constituents posed a migration risk to groundwater. The NTCR action involved removal of approximately 12,092 m3 (15,816 yd3) of spent bullets and lead-impacted soil and off-site disposal. The removal action included soils from the berm area, a fill area that received scraped soils from the berm, and soil from a drainage ditch located on the edge of the berm area. Also included in the removal action was a mixture of soil, concrete, and asphalt from the other three range areas. Under this action, 11,796 m3 (15,429 yd3) of hazardous waste and impacted soil were removed from the SATA and transported to a permitted hazardous waste disposal facility (Lone Mountain Facility in Oklahoma) and 296 m3 (387 yd3) of nonhazardous waste (primarily concrete debris) were removed and transported to a local solid waste landfill for disposal. During the excavation process, the extent was continuously assessed through the use of a hand-held, field-portable X-ray fluorescence unit with results verified using confirmation sampling with certified laboratory analysis. Following the completion of the excavation and confirmation sampling, final contouring, grading, and establishment of vegetative cover was performed to stabilize the affected areas. The NTCR action began on August 17, 2010, and mechanical completion was achieved on April 27, 2011. The selected removal action met the removal action objectives (RAOs), is protective of human health and the environment both in the short- and long-term, was successful in removing potential ecological risks, and is protective of surface water and groundwater. Furthermore, the selected NTCR action met residential cleanup goals and resulted in the release of the SEA from restricted use contributing to the overall footprint reduction at SRS.

Kmetz, T.

2012-12-04T23:59:59.000Z

280

Definition of Environmental Management (EM) Completion | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Definition of Environmental Management (EM) Completion Definition of Environmental Management (EM) Completion Definition of Environmental Management (EM) Completion The purpose of this memorandum is to provide you with additional clarification on: 1) the specific activities that must be accomplished before an environmental cleanup project is complete; and 2) the specific activities that need to be accomplished before the Office of Environmental Management's (EM) responsibility for a site, or portions of a site, is complete. Definition of Environmental Management (EM) Completion More Documents & Publications EM SSAB Conference Calls - January 27, 2011 Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Site Transition Process upon Completion of the Cleanup Mission: Fact Sheet

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS June 1, 2010 - 12:00pm Addthis CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS Aiken, SC - Construction of a key cleanup facility at the Savannah River Site (SRS) is gaining some serious ground given the remarkable building progress since Fall 2009. Construction and operation of the Salt Waste Processing Facility (SWPF) is among the U.S. Department of Energy's (DOE) highest cleanup priorities. When operational, SWPF will treat millions of gallons of salt waste currently stored in 49 underground tanks at SRS by removing radioactive constituents for vitrification at the nearby Defense Waste Processing Facility. Disposition of the salt waste inventory is a

282

GRR/Elements/18-FD-a.16 - Post-Construction Completion: Review of Cleanup  

Open Energy Info (EERE)

Construction Completion: Review of Cleanup Construction Completion: Review of Cleanup Effort to Determine Mitigation Effect < GRR‎ | Elements Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections 18-FD-a.16 - Post-Construction Completion: Review of Cleanup Effort to Determine Mitigation Effect After final cleanup is achieved, the EPA ensures that Superfund response actions provide for the long-term protection of human health and the environment. Logic Chain No Parents \V/ GRR/Elements/18-FD-a.16 - Post-Construction Completion: Review of Cleanup Effort to Determine Mitigation Effect (this page) \V/ No Dependents Under Development Add.png Add an Element Retrieved from "http://en.openei.org/w/index.php?title=GRR/Elements/18-FD-a.16_-_Post-Construction_Completion:_Review_of_Cleanup_Effort_to_Determine_Mitigation_Effect&oldid=453770

283

CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS June 1, 2010 - 12:00pm Addthis CONSTRUCTION OF KEY CLEANUP PROJECT GAINS GOOD GROUND AT SRS Aiken, SC - Construction of a key cleanup facility at the Savannah River Site (SRS) is gaining some serious ground given the remarkable building progress since Fall 2009. Construction and operation of the Salt Waste Processing Facility (SWPF) is among the U.S. Department of Energy's (DOE) highest cleanup priorities. When operational, SWPF will treat millions of gallons of salt waste currently stored in 49 underground tanks at SRS by removing radioactive constituents for vitrification at the nearby Defense Waste Processing Facility. Disposition of the salt waste inventory is a

284

DOE Completes Cleanup at New York, California Sites | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cleanup at New York, California Sites Cleanup at New York, California Sites DOE Completes Cleanup at New York, California Sites July 1, 2011 - 12:00am Addthis WASHINGTON, D.C. - Last month, the U.S. Department of Energy completed the cleanup of Cold War legacy waste at the Nuclear Radiation Development, LLC (NRD) site near Grand Island, New York, and at the Lawrence Berkeley National Laboratory in Berkeley, California. The two locations became the 18th and 19th sites to be completely cleaned of legacy waste. This milestone was achieved as part of a $172 million investment from the American Recovery and Reinvestment Act to expedite legacy waste cleanup activities across the DOE complex. "Cleanup of these two sites represents important and continued progress in the Department of Energy's commitment to reducing the nation's nuclear

285

Thyroid nodularity and cancer among Chernobyl cleanup workers from Estonia  

SciTech Connect

Thyroid examinations, including palpation, ultrasound and, selectively, fine-needle aspiration biopsy, were conducted on nearly 2,000 Chernobyl cleanup workers from Estonia to evaluate the occurrence of thyroid cancer and nodular thyroid disease among men with protracted exposure to ionizing radiation. The examinations were conducted in four cities in Estonia during March-April 1995, 9 years after the reactor accident. The study population was selected from a predefined cohort of 4,833 cleanup workers from Estonia under surveillance for cancer incidence. These men had been sent to Chernobyl between 1986 and 1991 to entomb the damaged reactor, remove radioactive debris and perform related cleanup activities. A total of 2,997 men were invited for thyroid screening and 1,984 (66%) were examined. Estimates of radiation dose from external sources were obtained from military or other institutional records, and details about service dates and types of work performed while at Chernobyl were obtained from a self-administered questionnaire. Blood samples were collected for assay of chromosomal translocations in circulating lymphocytes and loss of expression of the glycophorin A (GPA) gene in erythrocytes. The primary outcome measure was the presence or absence of thyroid nodules as determined by the ultrasound examination. Of the screened workers, 1,247 (63%) were sent to Chernobyl in 1986, including 603 (30%) sent in April or May, soon after the accident. Workers served at Chernobyl for an average of 3 months. The average age was 32 years at the time of arrival at Chernobyl and 40 years at the time of thyroid examination. The mean documented radiation dose from external sources was 10.8 cGy. Biological indicators of exposure showed low correlations with documented dose, but did not indicate that the mean dose for the population was higher than the average documented dose. 47 refs., 1 fig., 9 tabs.

Inskip, P.D.; Boice, J.D. Jr. [National Cancer Inst., Rockville, MD (United States); Tekkel, M. [Univ. of New Mexico, Albuquerque, NM (United States)] [and others

1997-02-01T23:59:59.000Z

286

Pilot scale experience on IGCC hot gas cleanup  

SciTech Connect

In September 1993 Enviropower Inc. entered into a Cooperative Research and Development Agreement (CRADA) with the Department of Energy in order to develop and demonstrate the major components of an IGCC process such as hot gas cleanup systems. The objectives of the project are to develop and demonstrate: (1) hydrogen sulfide removal using regenerable metal oxide sorbent in pressurized fluidized bed reactors, (2) recovery of elemental sulfur from the tail-gas of the sorbent regenerator, and (3) hot gas particulate removal using ceramic candle filters.

Salo, K.; Ghazanfari, R.; Feher, G. [and others

1995-11-01T23:59:59.000Z

287

Microsoft Word - PSRP Updates 6-25-10_v2  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EM-NonDefense 6-8-10 1 EM-NonDefense 6-8-10 1 PSRP Name: The Office of Environmental Management Non-Defense Environmental Cleanup PSRP Lead Program Office and/or Laboratory/Site Office: The Office of Environmental Management PSRP Lead Manager: Cynthia Anderson, Recovery Act Program Manager phone: (202) 586-2083 e-mail: Cynthia.Anderson@em.doe.gov address: 1000 Independence Ave., SW Washington, DC 20585 1. Objectives Program Purpose This PSRP has been updated from previous versions in compliance with Management Procedures Memorandum No. 2010-06, dated May 2010 and reflects progress on milestones and performance measures in the Department of Energy (DOE) Office of Environmental Management (EM) program. The Department of Energy (DOE) Office of Environmental Management (EM) program non-

288

Prospects for pyrolysis technologies in managing municipal, industrial, and DOE cleanup wastes  

DOE Green Energy (OSTI)

Pyrolysis converts portions of municipal solid wastes, hazardous wastes, and special wastes such as tires, medical wastes, and even old landfills into solid carbon and a liquid or gaseous hydrocarbon stream. Pyrolysis heats a carbonaceous waste stream typically to 290--900 C in the absence of oxygen, and reduces the volume of waste by 90% and its weight by 75%. The solid carbon char has existing markets as an ingredient in many manufactured goods, and as an adsorbent or filter to sequester certain hazardous wastes. Pyrolytic gases may be burned as fuel by utilities, or liquefied for use as chemical feedstocks, or low-pollution motor vehicle fuels and fuel additives. This report analyzes the potential applications of pyrolysis in the Long Island region and evaluates for the four most promising pyrolytic systems their technological and commercial readiness, their applicability to regional waste management needs, and their conformity with DOE requirements for environmental restoration and waste management. This summary characterizes their engineering performance, environmental effects, costs, product applications, and markets. Because it can effectively treat those wastes that are inadequately addressed by current systems, pyrolysis can play an important complementing role in the region`s existing waste management strategy. Its role could be even more significant if the region moves away from existing commitments to incineration and MSW composting. Either way, Long Island could become the center for a pyrolysis-based recovery services industry serving global markets in municipal solid waste treatment and hazardous waste cleanup. 162 refs.

Reaven, S.J. [State Univ. of New York, Stony Brook, NY (United States)

1994-12-01T23:59:59.000Z

289

Final Cover ES&H Idaho Cleanup Proj.cdr  

NLE Websites -- All DOE Office Websites (Extended Search)

and Decommissioning DOE U.S. Department of Energy EM DOE Office of Environmental Management EMS Environmental Management System ES&H Environment, Safety, and Health HSS Office...

290

Evaluation of gasification and gas cleanup processes for use in molten carbonate fuel cell power plants. Final report. [Contains lists and evaluations of coal gasification and fuel gas desulfurization processes  

DOE Green Energy (OSTI)

This report satisfies the requirements for DOE Contract AC21-81MC16220 to: List coal gasifiers and gas cleanup systems suitable for supplying fuel to molten carbonate fuel cells (MCFC) in industrial and utility power plants; extensively characterize those coal gas cleanup systems rejected by DOE's MCFC contractors for their power plant systems by virtue of the resources required for those systems to be commercially developed; develop an analytical model to predict MCFC tolerance for particulates on the anode (fuel gas) side of the MCFC; develop an analytical model to predict MCFC anode side tolerance for chemical species, including sulfides, halogens, and trace heavy metals; choose from the candidate gasifier/cleanup systems those most suitable for MCFC-based power plants; choose a reference wet cleanup system; provide parametric analyses of the coal gasifiers and gas cleanup systems when integrated into a power plant incorporating MCFC units with suitable gas expansion turbines, steam turbines, heat exchangers, and heat recovery steam generators, using the Westinghouse proprietary AHEAD computer model; provide efficiency, investment, cost of electricity, operability, and environmental effect rankings of the system; and provide a final report incorporating the results of all of the above tasks. Section 7 of this final report provides general conclusions.

Jablonski, G.; Hamm, J.R.; Alvin, M.A.; Wenglarz, R.A.; Patel, P.

1982-01-01T23:59:59.000Z

291

Oak Ridge EM Program Increases Focus on Mercury Cleanup | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Increases Focus on Mercury Cleanup Increases Focus on Mercury Cleanup Oak Ridge EM Program Increases Focus on Mercury Cleanup May 7, 2013 - 12:00pm Addthis Tennessee Department of Environment and Conservation Commissioner Robert Martineau, left to right, U.S. Sen. Lamar Alexander (R-Tenn.), Oak Ridge EM Manager Mark Whitney, EM Senior Advisor Dave Huizenga and EPA Deputy Regional Administrator for Region 4 Stan Meiburg gathered for the announcement on mercury cleanup. Tennessee Department of Environment and Conservation Commissioner Robert Martineau, left to right, U.S. Sen. Lamar Alexander (R-Tenn.), Oak Ridge EM Manager Mark Whitney, EM Senior Advisor Dave Huizenga and EPA Deputy Regional Administrator for Region 4 Stan Meiburg gathered for the announcement on mercury cleanup. OAK RIDGE, Tenn. - EM Senior Advisor Dave Huizenga recently joined local

292

Head of EM to Kick Off Congressional Nuclear Cleanup Caucus | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Head of EM to Kick Off Congressional Nuclear Cleanup Caucus Head of EM to Kick Off Congressional Nuclear Cleanup Caucus Head of EM to Kick Off Congressional Nuclear Cleanup Caucus April 22, 2013 - 12:00pm Addthis WASHINGTON, D.C. - EM Senior Advisor Dave Huizenga will provide an overview of EM's proposed fiscal year 2014 budget Thursday in the first of six briefings for the 19th annual U.S. House Nuclear Cleanup Caucus. Huizenga rolled out the $5.622 billion budget request earlier this month. The proposal, which requires approval by Congress, enables EM progress in all areas of the nuclear cleanup program while maintaining safety and compliance across the complex. The briefings are organized by Rep. Doc Hastings (R-Wash.), who chairs the bipartisan caucus. "These briefings provide valuable insight and help educate my colleagues

293

An Update on the Hanford Site and Cleanup Progress | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

An Update on the Hanford Site and Cleanup Progress An Update on the Hanford Site and Cleanup Progress An Update on the Hanford Site and Cleanup Progress September 24, 2013 - 6:45pm Addthis An Update on the Hanford Site and Cleanup Progress Dr. Ernest Moniz Dr. Ernest Moniz Secretary of Energy What are the key facts? For 40 years, the Hanford Site in Washington state was involved in the production of plutonium as part of our national defense efforts. Legacy cleanup progress at the Hanford site has been significant, including 100 percent of the site's spent fuel having been removed from areas around the Columbia River and placed in safe, secure dry storage. But there is more work to do. A new Framework will aid discussions with the state of Washington as the Energy Department works to resolve concerns about completion of the

294

Site Transition Summary: Cleanup Completion to Long-Term Stewardship at  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Summary: Cleanup Completion to Long-Term Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites Long-term stewardship (LTS) includes the physical controls, institutions, information, and other mechanisms needed to ensure protection of people and the environment at sites where the U.S. Department of Energy (DOE) has completed or plans to complete cleanup (e.g., landfill closures, remedial actions, removal actions, and facility stabilization). This concept includes land-use controls, information management, monitoring and maintenance. Site Transition Summary: Cleanup Completion to Long-Term Stewardship at Department of Energy On-going Mission Sites

295

Idaho Site Completes Cleanup with Help from Workers who Shipped Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Completes Cleanup with Help from Workers who Shipped Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago From the 1950s until the 1980s, workers at the former Rocky Flats Plant near Denver, Colo., sent hundreds of thousands of barrels and boxes of radioactive and hazardous waste to the Idaho National Laboratory (INL) for disposal both above and below ground. Now, some of those who sent the Cold War weapons waste to Idaho are helping identify the waste in pits dug up for the first time in more than 40 years. Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago More Documents & Publications Sound Project Management, Safe and Efficient Work Lead to Savings for More Recovery Act Cleanup

296

Idaho Site Completes Cleanup with Help from Workers who Shipped Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Site Completes Cleanup with Help from Workers who Shipped Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago From the 1950s until the 1980s, workers at the former Rocky Flats Plant near Denver, Colo., sent hundreds of thousands of barrels and boxes of radioactive and hazardous waste to the Idaho National Laboratory (INL) for disposal both above and below ground. Now, some of those who sent the Cold War weapons waste to Idaho are helping identify the waste in pits dug up for the first time in more than 40 years. Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago More Documents & Publications Sound Project Management, Safe and Efficient Work Lead to Savings for More Recovery Act Cleanup

297

Evaluation of secondary-system layup and cleanup practices and processes. Final report. [PWR  

Science Conference Proceedings (OSTI)

The study of PWR secondary system layup and cleanup practices was undertaken to evaluate current and proposed methods of corrosion product control associated with extended plant outages. The overall goal was to evaluate means for significantly minimizing the steam generator sludge burden. The study included a field survey of 14 representative PWR plants, an extensive literature search and an evaluation of corrosion product transport data. Recommendations for layup and cleanup system processes were derived from these practices and related information. Estimates of the potential benefits to be expected in the control of corrosion products by controlled layup environments during extended outages and by cleanup following such outages are provided. Cleanup during all, or most, phases of operation is indicated as being most beneficial. Layup and cleanup system process design information is also provided.

Cleary, W.F.

1983-04-01T23:59:59.000Z

298

Office of Environmental Management FY 2011 Budget Request  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

on 20 Years of Cleanup Progress: on 20 Years of Cleanup Progress: Investments to sustain risk reduction and strengthen technology Office of Environmental Management Office of Environmental Management FY 2011 Budget Request FY 2011 Budget Request Dr. Inés Triay Dr. Inés Triay Assistant Secretary Assistant Secretary Office of Environmental Management Office of Environmental Management February 2010 Building on 20 Years of Cleanup Progress: Investments to sustain risk reduction and strengthen technology Chief Business Chief Technical Assistant Secretary Principal Deputy Assistant Secretary EM has embarked on a Journey to Excellence 2 Our Vision: "EM completes quality work safely, on schedule and within cost and delivers demonstrated value to the American taxpayer." Chief Business Officer

299

Home I Qoehannn Site Facility Cleanup yroject Histow Cleanun  

Office of Legacy Management (LM)

Home Home I Qoehannn Site Facility Cleanup yroject Histow Cleanun Progress Media PowerPoint Robotics Gallem Contacts A view of the Permagrain building from the e Located in northwestern Clearfield County, Quehanna many businesses that have used radiation in their man facility contains residual radioactivity left over from \I for the federal government. Under an approved plan by the federal Nuclear Reeul: responsible regulatory agency, the Commonwealth be; The site now includes operations for PermaGrain Prod manufacturer of specialty wood tile and flooring. 1 Home 1 Histow 1 Cleanun 1 Progress I ( Media 1 PowerPoint I Robotics ( Gallerv 1 Contacts ( Contact Webmaster Last Modified ( I ofl 3s been the location of lcturing processes. The .k conducted decades ag

300

Protecting Recovery Act Cleanup Site During Massive Wildfire  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 13, 2011 July 13, 2011 Protecting Recovery Act Cleanup Site During Massive Wildfire LOS ALAMOS, N.M. - Effective safety procedures in place at Los Alamos National Laboratory would have provided protections in the event that the raging Las Conchas fire had spread to the site of an American Recovery and Reinvestment Act project. "Our procedures not only placed the waste excavation site, Materials Disposal Area B (MDA-B), into a safe posture so it was well protected during the fire, but also allowed us to resume work quickly," said Project Director Al Chaloupka. The largest wildfire in New Mexico history forced the Lab to close for more than a week. While firefighters battled the fire, Recovery Act project officials were making plans to re-start the Recovery Act excavation of MDA-B when it was safe to return to

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

NETL: Gasification - Recovery Act: High Temperature Syngas Cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

Syngas Processing Systems Syngas Processing Systems Recovery Act: High Temperature Syngas Cleanup Technology Scale-Up and Demonstration Project Research Triangle Institute Project Number: FE0000489 Project Description Research Triangle Institute (RTI) is designing, building, and testing the Warm Temperature Desulfurization Process (WDP) at pre-commercial scale (50 megawatt electric equivalent [MWe]) to remove more than 99.9 percent of the sulfur from coal-derived synthesis gas (syngas). RTI is integrating this WDP technology with an activated methyl diethanolamine (aMDEA) solvent technology to separate 90% of the carbon dioxide (CO2) from shifted syngas. The Polk Power Station, an integrated gasification combined cycle (IGCC) power plant, will supply approximately 20% of its coal-derived syngas as a slipstream to feed into the pre-commercial scale technologies being scaled-up.

302

Hanford Site environmental management specification  

SciTech Connect

The US Department of Energy, Richland Operations Office (RL) uses this Hanford Site Environmental Management Specification (Specification) to document top-level mission requirements and planning assumptions for the prime contractors involved in Hanford Site cleanup and infrastructure activities under the responsibility of the US Department of Energy, Office of Environmental Management. This Specification describes at a top level the activities, facilities, and infrastructure necessary to accomplish the cleanup of the Hanford Site and assigns this scope to Site contractors and their respective projects. This Specification also references the key National Environmental Policy Act of 1969 (NEPA), Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and safety documentation necessary to accurately describe the cleanup at a summary level. The information contained in this document reflects RL`s application of values, priorities, and critical success factors expressed by those involved with and affected by the Hanford Site project. The prime contractors and their projects develop complete baselines and work plans to implement this Specification. These lower-level documents and the data that support them, together with this Specification, represent the full set of requirements applicable to the contractors and their projects. Figure 1-1 shows the relationship of this Specification to the other basic Site documents. Similarly, the documents, orders, and laws referenced in this specification represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents.

Grygiel, M.L.

1998-06-10T23:59:59.000Z

303

Application of NEPA to CERCLA and RCRA Cleanup Actions  

Energy.gov (U.S. Department of Energy (DOE))

The document clarifies DOE policies to streamline the environmental review of actions to be taken under CERCLA and RCRA.

304

USING RISK-BASED STANDARDS WILL SHORTEN CLEANUP TIME AT PETROLEUM CONTAMINATED SITES  

E-Print Network (OSTI)

The Air Force has identified more than 4,500 sites that require environmental investigation and possible remediation. About 2,500 of these are contaminated with petroleum hydrocarbons such as jet fuel, diesel, gasoline, and heating oil. Many of the sites that require remediation will be cleaned up based on an established regulatory standard. Many state and federal regulators routinely enforce a soil cleanup standard of 100 mg/kg total petroleum hydrocarbons (TPH). Several states have lowered this standard to 50 mg/kg TPH just for "good measure." The 100 mg/kg TPH standard is often used across the board--without regard for the type of petroleum hydrocarbon contamination being remediated and with little thought about the risk-based standards on which that figure was established. But where exactly did the number come from and and how did it become a standard in the first place? The answer can be traced to the California Leaking Underground Fuel Tank Field Manual, or LUFT, a manual designed to provide a consistent approach to underground storage tank spills (State of California, 1989). The LUFT manual clearly illustrates that the 100 mg/kg TPH standard is based on a

Lieutenant Colonel; Ross N. Miller; Lieutenant Colonel; Ross N. Miller

1992-01-01T23:59:59.000Z

305

Task 3.10 - Gas Separation and Hot-Gas Cleanup: Topical report, August 1995  

DOE Green Energy (OSTI)

Catalytic gasification of coal to produce H{sub 2}-, CO-, and CH{sub 4}-rich mixtures of gases for consumption in molten carbonate fuel cells is currently under development; however, to optimize the fuel cell performance and extend its operating life, it is desired to separate as much of the inert components (i.e., CO{sub 2} and N{sub 2}) and impurities (i e., H{sub 2}S and NH{sub 3}) as possible from the fuel gas before it enters the fuel cell. In addition, the economics of the integrated gasification combined cycle (IGCC) can be improved by separating as much of the hydrogen as possible from the fuel, since hydrogen is a high-value product. Researchers at the Energy {ampersand} Environmental Research Center (EERC) and Bend Research, Inc., investigated pressure-driven membranes as a method for accomplishing this gas separation and hot- gas cleanup. These membranes are operated at temperatures as high as 800{degrees}C and at pressures up to 300 psig. They have very small pore sizes that separate the undesirable gases by operating in the Knudsen diffusion region of mass transport (30-50 A) or in the molecular sieving region of mass transport phenomena (less than 5A). In addition, H{sub 2} separation through a palladium metal membrane proceeds via a solution- diffusion mechanism for atomic hydrogen. This allows the membranes to exhibit extremely high selectivity for hydrogen separation.

Swanson, M.L.

1997-12-31T23:59:59.000Z

306

Landfill gas cleanup for carbonate fuel cell power generation. Final report  

DOE Green Energy (OSTI)

Landfill gas represents a significant fuel resource both in the US and worldwide. The emissions of landfill gas from existing landfills has become an environmental liability contributing to global warming and causing odor problems. Landfill gas has been used to fuel reciprocating engines and gas turbines, and may also be used to fuel carbonate fuel cells. Carbonate fuel cells have high conversion efficiencies and use the carbon dioxide present in landfill gas as an oxidant. There are, however, a number of trace contaminants in landfill gas that contain chlorine and sulfur which are deleterious to fuel cell operation. Long-term economical operation of fuel cells fueled with landfill gas will, therefore, require cleanup of the gas to remove these contaminants. The overall objective of the work reported here was to evaluate the extent to which conventional contaminant removal processes could be combined to economically reduce contaminant levels to the specifications for carbonate fuel cells. A pilot plant cleaned approximately 970,000 scf of gas over 1,000 hours of operation. The testing showed that the process could achieve the following polished gas concentrations: less than 80 ppbv hydrogen sulfide; less than 1 ppmv (the detection limit) organic sulfur; less than 300 ppbv hydrogen chloride; less than 20--80 ppbv of any individual chlorinated hydrocarbon; and 1.5 ppm sulfur dioxide.

Steinfield, G.; Sanderson, R.

1998-02-01T23:59:59.000Z

307

Integrated low emissions cleanup system for direct coal-fueled turbines  

SciTech Connect

The Westinghouse Electric Corporation, Science Technology Center (W-STC) is developing an Integrated Low Emissions Cleanup (ILEC) concept for high-temperature gas cleaning to meet environmental standards, as well as to economical gas turbine life. The ILEC concept simultaneously controls sulfur, particulate, and alkali contaminants in high-pressure fuel gases or combustion gases at temperatures up to 1850[degrees]F for advanced power generation systems (PFBC, APFBC, IGCC, DCF7). The objective of this program is to demonstrate, at a bench scale, the conceptual, technical feasibility of the REC concept. The ELEC development program has a 3 phase structure: Phase 1 - laboratory-scale testing; phase 2 - bench-scale equipment; design and fabrication; and phase 3 - bench-scale testing. Phase 1 laboratory testing has been completed. In Phase 1, entrained sulfur and alkali sorbent kinetics were measured and evaluated, and commercial-scale performance was projected. Related cold flow model testing has shown that gas-particle contacting within the ceramic barrier filter vessel will provide a good reactor environment. The Phase 1 test results and the commercial evaluation conducted in the Phase 1 program support the bench-scale facility testing to be performed in Phase 3. Phase 2 is nearing completion with the design and assembly of a modified, bench-scale test facility to demonstrate the technical feasibility of the ILEC features. This feasibility testing will be conducted in Phase 3.

Lippert, T.E.; Newby, R.A.; Alvin, M.A.; Bachovchin, D.M.; Smeltzer, E.E.; Yang, W.C.

1992-01-01T23:59:59.000Z

308

Integrated low emissions cleanup system for direct coal-fueled turbines  

SciTech Connect

The Westinghouse Electric Corporation, Science & Technology Center (W-STC) is developing an Integrated Low Emissions Cleanup (ILEC) concept for high-temperature gas cleaning to meet environmental standards, as well as to economical gas turbine life. The ILEC concept simultaneously controls sulfur, particulate, and alkali contaminants in high-pressure fuel gases or combustion gases at temperatures up to 1850{degrees}F for advanced power generation systems (PFBC, APFBC, IGCC, DCF7). The objective of this program is to demonstrate, at a bench scale, the conceptual, technical feasibility of the REC concept. The ELEC development program has a 3 phase structure: Phase 1 - laboratory-scale testing; phase 2 - bench-scale equipment; design and fabrication; and phase 3 - bench-scale testing. Phase 1 laboratory testing has been completed. In Phase 1, entrained sulfur and alkali sorbent kinetics were measured and evaluated, and commercial-scale performance was projected. Related cold flow model testing has shown that gas-particle contacting within the ceramic barrier filter vessel will provide a good reactor environment. The Phase 1 test results and the commercial evaluation conducted in the Phase 1 program support the bench-scale facility testing to be performed in Phase 3. Phase 2 is nearing completion with the design and assembly of a modified, bench-scale test facility to demonstrate the technical feasibility of the ILEC features. This feasibility testing will be conducted in Phase 3.

Lippert, T.E.; Newby, R.A.; Alvin, M.A.; Bachovchin, D.M.; Smeltzer, E.E.; Yang, W.C.

1992-12-31T23:59:59.000Z

309

Collaboration Results - Applying Technical Solutions To Environmental Remediation Problems  

Science Conference Proceedings (OSTI)

Within the Department of Energy's Office of Environmental Management (EM), the Office of Science and Technology (OST) identifies and develops innovative technologies that accelerate cleanup of high-priority environmental contamination problems and enable EM closure sites to meet closure schedules. OST manages an integrated research and development program that is essential to completing timely and cost-effective cleanup and stewardship of DOE sites. While innovative technologies can make significant contributions to the cleanup process, in some cases, EM has encountered unexpected barriers to their implementation. Technical obstacles are expected, but administrative challenges-such as regulatory, organizational, and stakeholder issues-must also be addressed. OST has found that collaborative needs identification and problem solving are essential components in overcoming these barriers. Collaboration helps EM meet its cleanup goals, close sites, and reduce the overall cost of cleanup at DOE sites nationwide. This paper presents examples of OST's collaboration efforts that expedite site closure and solve specific cleanup problems at EM sites.

Boyd, G.; Fiore, J.; Walker, J.; DeRemer, C.; Wight, E.

2002-02-26T23:59:59.000Z

310

Environmental Management Advisory Board Subcommittees | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EMAB » Environmental EMAB » Environmental Management Advisory Board Subcommittees Environmental Management Advisory Board Subcommittees ACQUISITION AND PROJECT MANAGEMENT SUBCOMMITTEE SUBCOMMITTEE PURPOSE: The Subcommittee will provide advice, information, and recommendations to the Assistant Secretary for Environmental Management (EM) relating to project management. Although, EM has a solid performance record for cleanup projects, EM must improve its ability to deliver all projects within cost and on schedule, thereby reducing EM's operations and maintenance costs. The Subcommittee produces reports and recommendations to the Environmental Management Advisory Board (EMAB) as necessary. Mr. David W. Swindle, Jr. (Co-Chair) Federal Services/URS Corporation Mr. G. Brian Estes (Co-Chair)

311

Brookhaven Graphite Research Reactor | Environmental Restoration Projects |  

NLE Websites -- All DOE Office Websites (Extended Search)

- Cleanup Actions - Cleanup Actions Since the Brookhaven Graphite Research Reactor (BGRR) was shut down in 1968, many actions have been taken as part of the complex decommissioning. The actions undertaken throughout the BGRR complex ensure that the structures that remain are in a safe and stable condition and prepared it for long-term surveillance and maintenance. Regulatory Requirements The decommissioning of the BGRR was conducted under the federal Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). In 1992, an Interagency Agreement (PDF) among the DOE, the U.S. Environmental Protection Agency (EPA) and the New York State Department of Environmental Conservation (NYSDEC) became effective. The IAG provided the overall framework for conducting environmental restoration activities at

312

Integrated low emissions cleanup system for direct coal fueled turbines (moving bed, fluid bed contactor/ceramic filter)  

SciTech Connect

The United States Department of Energy, Morgantown Energy Research Center (DOE/METC), is sponsoring the development of direct coal-fired turbine power plants as part of their Heat Engines program. A major technical challenge remaining for the development of the direct coal-fired turbine is high-temperature combustion gas cleaning to meet environmental standards for sulfur oxides and particulate emissions, as well as to provide acceptable turbine life. The Westinghouse Electric Corporation, Science Technology Center, is evaluating two Integrated Low Emissions Cleanup (ILEC) concepts that have been configured to meat this technical challenge: a baseline ceramic barrier filter ILEC concept, and a fluidized bed ILEC concept. These ILEC concepts simultaneously control sulfur, particulate, and alkali contaminants in the high-pressure combustion gases at turbine inlet temperatures up to 2300[degree]F. This document reports the status of a program in the nineteenth quarter to develop this ILEC technology for direct coal-fired turbine power plants.

Newby, R.A.; Alvin, M.A.; Bachovchin, D.M.; Yang, W.C.; Smeltzer, E.E.; Lippert, T.E.

1992-10-20T23:59:59.000Z

313

Integrated low emissions cleanup system for direct coal fueled turbines. Twenty-eighth quarterly report, July--September 1994  

SciTech Connect

The United States Department of Energy, Morgantown Energy Research Center (DOE/METC), is sponsoring the development of advanced, coal-fueled turbine power plants such as pressurized fluid bed combustion and coal gasification combined cycles. A major technical challenge remaining for the development of the coal-fueled turbine is high-temperature gas cleaning to meet environmental standards for sulfur oxides and particulate emissions, as well as to provide acceptable turbine life. The Westinghouse Electric Corporation, Science & Technology Center, is evaluating Integrated Low Emissions Cleanup (ILEC) concepts that have been configured to meet this technical challenge. These ILEC concepts simultaneously control sulfur, particulate, and alkali contaminants in the high-pressure process gases. This document reports the status of a program in the twenty-seventh quarter to develop this ILEC technology.

Newby, R.A.; Alvin, M.A.; Bachovchin, D.M. [and others

1996-02-01T23:59:59.000Z

314

1999 Annual Site Environmental Report --  

E-Print Network (OSTI)

The Tonopah Test Range (TTR) in Nevada is a government-owned, contractor-operated facility. Sandia National Laboratories (SNL) is run by Sandia Corporation, a subsidiary of Lockheed Martin Corporation. The U.S. Department of Energy (DOE) oversees the operations of TTR through its Kirtland Area Office (KAO), which reports to the Albuquerque Operations Office (AL). Sandia Corporation conducts operations at TTR in support of DOE's Weapons Ordnance Program and has operated the site since 1957. Westinghouse Government Services subcontracts to SNL in administering most of the environmental programs at the site. This annual report summarizes data and the compliance status of the environmental protection and monitoring program at TTR through December 31, 1999. The compliance status of environmental regulations applicable at the site include state and federal regulations governing air emissions, wastewater effluent, waste management, and Environmental Restoration (ER) cleanup activities. Terrestrial surveillance for radiological and nonradiological contaminants is also conducted, as required by DOE, to determine contaminant levels at offsite, perimeter, and onsite locations. Sandia Corporation is responsible only for those environmental program activities related to SNL's operations. The DOE Nevada Operations office (NVOO) retains responsibility for the cleanup and management of ER sites at TTR. Environmental monitoring and surveillance programs are required by DOE Order 5400.1, General Environmental Protection Program (DOE 1990), and DOE Order 231.1, Environment, Safety and Health Reporting (DOE 1996a).

Dianne Duncan; William Forston; Rebecca Sanchez

2000-01-01T23:59:59.000Z

315

The Western Environmental Technology Office (WETO), Butte, Montana, technology summary  

SciTech Connect

This document has been prepared by the DOE Environmental Management (EM) Office of Technology Development (OTD) to highlight its research, development, demonstration, testing, and evaluation activities funded through the Western Environmental Technology Office (WETO) in Butte, Montana. Technologies and processes described have the potential to enhance DOE`s cleanup and waste management efforts, as well as improve US industry`s competitiveness in global environmental markets. WETO`s environmental technology research and testing activities focus on the recovery of useable resources from waste. Environmental technology development and commercialization activities will focus on mine cleanup, waste treatment, resource recovery, and water resource management. Since the site has no record of radioactive material use and no history of environmental contamination/remediation activities, DOE-EM can concentrate on performing developmental and demonstration activities without the demands of regulatory requirements and schedules. Thus, WETO will serve as a national resource for the development of new and innovative environmental technologies.

Not Available

1994-09-01T23:59:59.000Z

316

Hazardous Sites Cleanup Act (Pennsylvania) | Open Energy Information  

Open Energy Info (EERE)

into a usable product. Policy Contact Contact Name Dwayne Womer Department Department of Environmental Protection Division Bureau of Waste Management Address Post Office Box...

317

U.S. Department of Energy Keeps Its Cleanup Commitments  

NLE Websites -- All DOE Office Websites (Extended Search)

and advanced challenges in nuclear energy and other energy resources, national security, and environmental management. For the past four years, the Idaho Operations Office...

318

Soil and Groundwater Cleanup - In-Situ Grouting, Lessons Learned...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

for In Situ Decommissioning (Feb. 2013) Secure Fuels from Domestic Resources - Oil Shale and Tar Sands DOE Environmental Management Strategy and Experience for In-Situ...

319

Soil and Groundwater Cleanup - In-Situ Grouting, Lessons Learned...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

In Situ Decommissioning (Feb. 2013) DOE Environmental Management Strategy and Experience for In-Situ Decommissioning Secure Fuels from Domestic Resources - Oil Shale and Tar Sands...

320

Databases and Tools | Waste and Cleanup Risk Assessment | OSWER...  

NLE Websites -- All DOE Office Websites (Extended Search)

Usage and Limitations: thumbtack These calculations are based on the U.S. Environmental Protection Agency's (EPA) Soil Screening Guidance. The guidance must be read before...

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, RTI to Design and Build Gas Cleanup System for IGCC Power DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants July 13, 2009 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) announces a collaborative project with Research Triangle Institute (RTI) International to design, build, and test a warm gas cleanup system to remove multiple contaminants from coal-derived syngas. The 50-MWe system will include technologies to remove trace elements such as mercury and arsenic, capture the greenhouse gas carbon dioxide (CO2), and extract more than 99.9 percent of the sulfur from the syngas. A novel process to convert the extracted sulfur to a pure elemental sulfur product will also be tested. This project supports DOE's vision of coal power plants with near-zero

322

Hanford Reaches Recovery Act Goal for Waste Cleanup Ahead of Schedule -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reaches Recovery Act Goal for Waste Cleanup Ahead of Reaches Recovery Act Goal for Waste Cleanup Ahead of Schedule - Workers Shipped 1,800 Cubic Meters for Treatment and Disposal Hanford Reaches Recovery Act Goal for Waste Cleanup Ahead of Schedule - Workers Shipped 1,800 Cubic Meters for Treatment and Disposal July 26, 2011 - 12:00pm Addthis Media Contacts Andre Armstrong, CH2M HILL Andre_L_Armstrong@rl.gov 509-376-6773 Geoff Tyree, DOE Geoffrey.Tyree@rl.doe.gov 509-376-4171 RICHLAND, Wash. - Today, the Department of Energy Hanford Site announced it reached a cleanup goal more than two months ahead of schedule at the Hanford Site in southeast Washington State. Supported by funding from the American Recovery and Reinvestment Act, workers retrieved containers of contaminated material from storage buildings and underground storage trenches and prepared them for treatment

323

DOE Update on USEC Cleanup, R&D, and Loan Guarantee Application |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Update on USEC Cleanup, R&D, and Loan Guarantee Application Update on USEC Cleanup, R&D, and Loan Guarantee Application DOE Update on USEC Cleanup, R&D, and Loan Guarantee Application October 15, 2009 - 12:00am Addthis WASHINGTON, DC - Over the course of this year, the Department of Energy has worked closely with USEC on its loan guarantee application. This summer, the Department made several announcements related to USEC and its application, and is providing an update on those announcements at this time. At the end of July, the Department of Energy announced an investment worth about $150 to $200 million per year for the next four years to expand and accelerate cleanup efforts of Cold War-era contamination at the Portsmouth uranium enrichment facility adjacent to the American Centrifuge Plant (ACP). This investment, on top of the base budget and Recovery Act funding,

324

DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

DOE, RTI to Design and Build Gas Cleanup System for IGCC Power DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants DOE, RTI to Design and Build Gas Cleanup System for IGCC Power Plants July 13, 2009 - 1:00pm Addthis Washington, DC - The U.S. Department of Energy (DOE) announces a collaborative project with Research Triangle Institute (RTI) International to design, build, and test a warm gas cleanup system to remove multiple contaminants from coal-derived syngas. The 50-MWe system will include technologies to remove trace elements such as mercury and arsenic, capture the greenhouse gas carbon dioxide (CO2), and extract more than 99.9 percent of the sulfur from the syngas. A novel process to convert the extracted sulfur to a pure elemental sulfur product will also be tested. This project supports DOE's vision of coal power plants with near-zero

325

Sound Project Management, Safe and Efficient Work Lead to Savings for More Recovery Act Cleanup  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

IDAHO FALLS, Idaho - Sound management practices and safe, efficient IDAHO FALLS, Idaho - Sound management practices and safe, efficient work have led to cost savings and rapid progress in the Idaho site's American Recovery and Reinvestment Act projects. The efficiencies have freed up $12 million for additional Cold War cleanup. That $12 million from the Recovery Act is being used to exhume targeted buried waste from a quarter-acre portion of a landfill called Pit 9 so it can be disposed permanently and safely. The additional cleanup, scheduled for completion in spring 2012, is part of the Idaho site's broader work to accelerate legacy waste removal in 5.69 acres of a disposal area, a cleanup project that protects the Snake River Plain Aquifer. Recovery Act workers with CH2M-WG Idaho, the Idaho site's main cleanup

326

Hanford Reaches Recovery Act Goal for Waste Cleanup Ahead of Schedule -  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reaches Recovery Act Goal for Waste Cleanup Ahead of Reaches Recovery Act Goal for Waste Cleanup Ahead of Schedule - Workers Shipped 1,800 Cubic Meters for Treatment and Disposal Hanford Reaches Recovery Act Goal for Waste Cleanup Ahead of Schedule - Workers Shipped 1,800 Cubic Meters for Treatment and Disposal July 26, 2011 - 12:00pm Addthis Media Contacts Andre Armstrong, CH2M HILL Andre_L_Armstrong@rl.gov 509-376-6773 Geoff Tyree, DOE Geoffrey.Tyree@rl.doe.gov 509-376-4171 RICHLAND, Wash. - Today, the Department of Energy Hanford Site announced it reached a cleanup goal more than two months ahead of schedule at the Hanford Site in southeast Washington State. Supported by funding from the American Recovery and Reinvestment Act, workers retrieved containers of contaminated material from storage buildings and underground storage trenches and prepared them for treatment

327

DOE Reaches Recovery Act Goal With Cleanup of All Legacy Transuranic Waste  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reaches Recovery Act Goal With Cleanup of All Legacy Reaches Recovery Act Goal With Cleanup of All Legacy Transuranic Waste at Sandia National Laboratories DOE Reaches Recovery Act Goal With Cleanup of All Legacy Transuranic Waste at Sandia National Laboratories May 3, 2012 - 12:00pm Addthis Media Contact Deb Gill, U.S. DOE Carlsbad Field Office, (575) 234-7270 CARLSBAD, N.M., May 3, 2012 -The U.S. Department of Energy (DOE) completed cleanup of the Cold War legacy transuranic (TRU) waste at Sandia National Laboratories (Sandia) in Albuquerque, New Mexico when four shipments of remote-handled (RH) TRU waste from Sandia arrived at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, N.M. for permanent disposal on May 2, 2012. The DOE Carlsbad Field Office (CBFO) reached one of its final milestones under the American Recovery and Reinvestment Act (ARRA) with the legacy TRU

328

Energy Department Announces $2.9 Billion Contract for Idaho Site Cleanup  

Energy.gov (U.S. Department of Energy (DOE))

WASHINGTON, D.C. The United States Department of Energy today announced the selection of CH2M-WG Idaho, LLC as the contractor responsible for the Idaho Cleanup Project through the year 2012 at...

329

Microsoft Word - DOE News Release-DOE Completes Cleanup at New...  

NLE Websites -- All DOE Office Websites (Extended Search)

at New York, California Sites Recovery Act funds accelerate cleanup; support job creation and footprint reduction WASHINGTON, D.C. - Last month, the U.S. Department of Energy...

330

Stimulus Funding Creating Cleanup Jobs At DOE?s Idaho Site  

NLE Websites -- All DOE Office Websites (Extended Search)

Stimulus Funding Creating Cleanup Jobs At DOEs Idaho Site Arimo resident Jeff Johnson did something this week he hasnt done since January. He reported to his new job. Funding...

331

Final Cover ES&H Idaho Cleanup Proj.cdr  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Cleanup Project Idaho Cleanup Project ISM August 2007 Office of Health, Safety and Security HSS Office of Independent Oversight Office of Health, Safety and Security Office of the Secretary of Energy Office of Environment, Safety, and Health Evaluations OVERSIGHT Table of Contents 1.0 INTRODUCTION ..........................................................................................1 2.0 POSITIVE ATTRIBUTES ...............................................................................3 3.0 WEAKNESSES ...............................................................................................5 4.0 RESULTS .........................................................................................................7 4.1 Work Planning and Control Processes ......................................................7

332

Evaluation and Categorization of Secondary System Layup and Cleanup Practices for PWR Plants  

Science Conference Proceedings (OSTI)

To determine ways to minimize corrosion-product transport to the secondary side of PWR steam generators, layup and post-shutdown cleanup practices now in use or proposed by utilities with operating PWR plants were examined. The results show that about 30% of the plants attempt routine layup of secondary systems during plant outages and about 60% attempt system cleanup before and during startup.

1982-12-01T23:59:59.000Z

333

Evaluation of Secondary-System Layup and Cleanup Practices and Processes  

Science Conference Proceedings (OSTI)

A study of PWR secondary-system layup and cleanup practices was undertaken to evaluate current and proposed methods of corrosion-product control associated with extended plant outages. The report describes a field survey of 14 representative PWR plants, an extensive literature search, and an evaluation of corrosion-product transport data. Recommendations for layup and cleanup processes are presented, along with system design information.

1983-04-01T23:59:59.000Z

334

HANDBOOK FOR CONDUCTING ORAL HISTORY INTERVIEWS RELATED TO TRIBAL AND INDIAN PARTICIPATION IN THE CONSTRUCTION, OPERATION AND CLEANUP OF THE NUCLEAR WEAPONS COMPLEX  

SciTech Connect

There were three major projects undertaken at the outset of the DOE/EM 22 Cooperative Agreement back in September 1995. There was a project relating to Tribal oral histories. Another project of the Cooperative Agreement related to technology and Tribal values and needs. This project by analogy could apply to issues of technology, environmental cleanup and other indigenous peoples internationally. How can Indian Tribes participate in defining the need for technology development rather than merely learning to adapt themselves and their situations and values to technology developed by others with differing needs, values and economic resources? And the third project was the placement of a Tribal intern in EM-22.

Cristann Gibson; Mervyn L. Tano; Albert Wing

1999-08-31T23:59:59.000Z

335

Assessment of coal gasification/hot gas cleanup based advanced gas turbine systems  

SciTech Connect

The major objectives of the joint SCS/DOE study of air-blown gasification power plants with hot gas cleanup are to: (1) Evaluate various power plant configurations to determine if an air-blown gasification-based power plant with hot gas cleanup can compete against pulverized coal with flue gas desulfurization for baseload expansion at Georgia Power Company's Plant Wansley; (2) determine if air-blown gasification with hot gas cleanup is more cost effective than oxygen-blown IGCC with cold gas cleanup; (3) perform Second-Law/Thermoeconomic Analysis of air-blown IGCC with hot gas cleanup and oxygen-blown IGCC with cold gas cleanup; (4) compare cost, performance, and reliability of IGCC based on industrial gas turbines and ISTIG power island configurations based on aeroderivative gas turbines; (5) compare cost, performance, and reliability of large (400 MW) and small (100 to 200 MW) gasification power plants; and (6) compare cost, performance, and reliability of air-blown gasification power plants using fluidized-bed gasifiers to air-blown IGCC using transport gasification and pressurized combustion.

1990-12-01T23:59:59.000Z

336

DOE/EA-1660: Combined Community Communications Facility and Infrastructure Cleanup on the Fitzner/Eberhardt Arid Land's Ecology Reserve, Hanford Site, Richland, WA (07/20/09)  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 2009 July 2009 DOE/EA-1660F Environmental Assessment Combined Community Communications Facility and Infrastructure Cleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland, Washington U.S. Department of Energy Richland Operations Office Richland, Washington 99352 Final Environmental Assessment July 2009 Sum-1 Summary Introduction. This Environmental Assessment (EA) provides information and analyses of proposed U.S. Department of Energy (DOE) activities associated with consolidating existing communications operations and removing excess facilities and infrastructure within the Fitzner/Eberhardt Arid Lands Ecology Reserve (ALE) at the Hanford Site near the City of Richland, Washington. Purpose and Need. To meet long-term federal agency missions, DOE needs to reduce indirect costs and

337

Advanced Simulation Capability for Environmental Management (ASCEM) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Advanced Simulation Capability for Environmental Management (ASCEM) Advanced Simulation Capability for Environmental Management (ASCEM) Advanced Simulation Capability for Environmental Management (ASCEM) Advanced Simulation Capability for Environmental Management (ASCEM) ASCEM is being developed to provide a tool and approach to facilitate robust and standardized development of performance and risk assessments for cleanup and closure activities throughout the EM complex. The ASCEM team is composed of scientists from eight National Laboratories. This team is leveraging Department of Energy (DOE) investments in basic science and applied research including high performance computing codes developed through the Advanced Scientific Computing Research and Advanced Simulation & Computing programs as well as collaborating with the Offices of Science,

338

2005 River Corridor Cleanup Contractor Revegetation Monitoring Report  

SciTech Connect

This report contains a compilation of the results of vegetation monitoring data that were collected in the spring and summer of 2005 for the Environmental Restoration Contractor's revegetation and mitigation areas on the Hanford Site.

A. L. Johnson

2005-09-12T23:59:59.000Z

339

Harnessing microbial activities for environmental cleanup Frank E Lo ffler1  

E-Print Network (OSTI)

Petroleum Institute, Depart- ment of Biotechnology of Petroleum, Eje Central La?zaro Ca?rdenas no. 152, Me; Hong et al., 1997). We described earlier the use of MTBE as sole organic carbon and energy source carbon sources The F- consortium could also use a wide range of hydrocarbons as sole carbon source

Löffler, Frank E.

340

GrayQbTM - SRNL Innovation at Work for Environmental Cleanup  

incident face a remarkable challenge ... Special software translates the PSP data into a map of the location, intensity, and energy of the source contamination.

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

CSMRI SITE ENVIRONMENTAL CONDITIONS: HISTORY, INVESTIGATION, AND CLEANUP IMPLEMENTATION REPORT AS OF 2011  

E-Print Network (OSTI)

Ci/g picoCuries per gram RI/FS Remedial Investigation/Feasibility Study RPD relative percent difference TCLP. Toxicity Characteristic Leaching Procedure (TCLP) results indicate that the affected material

342

Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project, November 2012  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Cleanup Project Idaho Cleanup Project Sodium Bearing Waste Treatment Project May 2011 November 2012 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Independent Oversight Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project Table of Contents 1.0 Introduction........................................................................................................................................... 1 2.0 Scope and Methodology ....................................................................................................................... 2

343

Surface and subsurface cleanup protocol for radionuclides, Gunnison, Colorado, UMTRA project processing site. Final [report  

Science Conference Proceedings (OSTI)

Surface and subsurface soil cleanup protocols for the Gunnison, Colorado, processing sits are summarized as follows: In accordance with EPA-promulgated land cleanup standards (40 CFR 192), in situ Ra-226 is to be cleaned up based on bulk concentrations not exceeding 5 and 15 pCi/g in 15-cm surface and subsurface depth increments, averaged over 100-m{sup 2} grid blocks, where the parent Ra-226 concentrations are greater than, or in secular equilibrium with, the Th-230 parent. A bulk interpretation of these EPA standards has been accepted by the Nuclear Regulatory Commission (NRC), and while the concentration of the finer-sized soil fraction less than a No. 4 mesh sieve contains the higher concentration of radioactivity, the bulk approach in effect integrates the total sample radioactivity over the entire sample mass. In locations where Th-230 has differentially migrated in subsoil relative to Ra-226, a Th-230 cleanup protocol has been developed in accordance with Supplemental Standard provisions of 40 CFR 192 for NRC/Colorado Department of Health (CDH) approval for timely implementation. Detailed elements of the protocol are contained in Appendix A, Generic Protocol from Thorium-230 Cleanup/Verification at UMTRA Project Processing Sites. The cleanup of other radionuclides or nonradiological hazards that pose a significant threat to the public and the environment will be determined and implemented in accordance with pathway analysis to assess impacts and the implications of ALARA specified in 40 CFR 192 relative to supplemental standards.

Not Available

1993-09-01T23:59:59.000Z

344

Evaluation of the total petroleum hydrocarbon standard for cleanup of petroleum contaminated sites. Master's thesis  

Science Conference Proceedings (OSTI)

This study evaluated the TPH (total petroleum hydrocarbon) cleanup standard for petroleum contaminated soils (PCS). A survey of 13 state regulators was performed to characterize current standards and regulatory viewpoints on the use of a TPH versus a BTEX cleanup standard. The regulatory community considers the BTEX constituents the greatest threat to groundwater, yet expressed concern that the use of a compound specific standard, without an accompanying analysis for TPH, might result in residual soil contamination that may present risk. This study also evaluated the ratio of BTEX TPH in soil over time. Based on JP-4 contaminated site soil data, this study demonstrated that the ratio of BTEX to TPH declines with time. The results indicate that the constant ratio of BTEX to TPH assumed by the California LUFT manual and Stokman and Dime's research is not valid for soils contaminated with JP-4. Lastly, this research identifies the cost savings potential that would result if a BTEX based standard, versus a TPH standard, were required at all Air Force sites. The research shows that only 13% of sites which would require cleanup under a TPH standard would require cleanup under a BTEX based standard. Soil cleanup standards, Petroleum hydrocarbons, Total petroleum hydrocarbons, TPH, Bezene, Toluene, Ethylbenzene, Ethyl-benzene, Xylene, BTEX, Petroleum contamination, JP-4.

Blaisdell, R.A.; Smallwood, M.E.

1993-09-01T23:59:59.000Z

345

Status of Environmental Management Initiatives to Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War  

Science Conference Proceedings (OSTI)

Fifty years of nuclear weapons production and energy research in the United States during the Cold War generated large amounts of radioactive wastes, spent nuclear fuel (SNF), excess plutonium and uranium, thousands of contaminated facilities, and contaminated soil and groundwater. During most of that half century, the Nation did not have the environmental regulatory structure or nuclear waste cleanup technologies that exist today. The result was a legacy of nuclear waste that was stored and disposed of in ways now considered unacceptable. Cleaning up and ultimately disposing of these wastes is the responsibility of the U.S. Department of Energy (DOE). In 1989, DOE established the Office of Environmental Management (EM) to solve the large scale and technically challenging risks posed by the world's largest nuclear cleanup. This required EM to build a new nuclear cleanup infrastructure, assemble and train a technically specialized workforce, and develop the technologies and tools required to safely decontaminate, disassemble, stabilize, disposition, and remediate unique radiation hazards. The sites where nuclear activities produced legacy waste and contamination include the original Manhattan Project sites--Los Alamos, New Mexico; Hanford, Washington; and Oak Ridge, Tennessee--as well as major Cold War sites, such as Savannah River Site, South Carolina; the Idaho National Laboratory, Idaho; Rocky Flats Plant, Colorado; and Fernald, Ohio. Today EM has responsibility for nuclear cleanup activities at 21 sites covering more than two million acres in 13 states, and employs more than 30,000 Federal and contractor employees, including scientists, engineers and hazardous waste technicians. This cleanup poses unique, technically complex problems, which must be solved under the most hazardous of conditions, and which will require billions of dollars a year for several more decades. The EM program focus during its first 10 years was on managing the most urgent risks and maintaining safety at each site while negotiating state and Federal environmental compliance agreements. The program also concentrated on characterizing waste and nuclear materials and assessing the magnitude and extent of environmental contamination. By the late 1990s, EM had made significant progress in identifying and characterizing the extent of contamination and cleanup required and began transitioning from primarily a characterization and stabilization program to an active cleanup and closure program. During that time, EM formulated multi-year cleanup and closure plans, which contributed to cleanup progress; however, reducing the overall environmental risk associated with the cleanup program remained a challenge. In response, the Secretary of Energy directed a review of the EM program be undertaken. The resulting 'Top-to Bottom Review' re-directed the program focus from managing risks to accelerating the reduction of these risks.

None

2009-01-01T23:59:59.000Z

346

Accelerated Clean-up of the United States Department of Energy, Mound Nuclear Weapons Facility in Miamisburg, Ohio  

Science Conference Proceedings (OSTI)

CH2M HILL is executing a performance-based contract with the United States Department of Energy to accelerate the safe closure of the nuclear facilities at the former Mound plant in Miamisburg, Ohio. The contract started in January 2003 with a target completion date of March 31, 2006. Our accelerated baseline targets completion of the project 2 years ahead of the previous baseline schedule, by spring 2006, and for $200 million less than previous estimates. This unique decommissioning and remediation project is located within the City of Miamisburg proper and is designed for transfer of the property to the Miamisburg Mound Community Improvement Corporation for industrial reuse. The project is being performed with the Miamisburg Mound Community Improvement Corporation and their tenants co-located on the site creating significant logistical, safety and stakeholder challenges. The project is also being performed in conjunction with the United States Department of Energy, United States Environmental Protection Agency, and the Ohio Environmental Protection Agency under the Mound 2000 regulatory cleanup process. The project is currently over 95% complete. To achieve cleanup and closure of the Mound site, CH2M HILL's scope includes: - Demolition of 64 nuclear, radiological and commercial facilities - Preparation for Transfer of 9 facilities (including a Category 2 nuclear facility) to the Miamisburg Mound Community Improvement Corporation for industrial reuse - Removal of all above ground utility structures and components, and preparation for transfer of 9 utility systems to Miamisburg Mound Community Improvement Corporation - Investigation, remediation, closure, and documentation of all known Potential Release Sites contaminated with radiological and chemical contamination (73 identified in original contract) - Storage, characterization, processing, packaging and shipment of all waste and excess nuclear materials - Preparation for Transfer of the 306 acre site to the Miamisburg Mound Community Improvement Corporation for industrial reuse In the first two and a half years the project has successfully completed more demolition work, more environmental remediation work and more waste shipping than any other period in site history while improving the safety statistics of the site significantly. CH2M HILL Mound established a safety culture to promote line management safety responsibility and continues to place a high emphasis on safety performance even in an accelerated closure environment. The Occupational Safety and Health Administration (OSHA), Time Restricted Case (TRC) and Days Away and Restricted Time (DART) rates improved 76% and 90%, respectively, since contract start from 2002 to 2005. These rates are the lowest the site has ever seen. The site has also gone over 1 million hours without a Lost Workday Case accident. Covered below are the key strategies for safety improvement and project delivery that have been successful at the Miamisburg Closure Project are presented. (authors)

Lehew, J.G.; Bradford, J.D.; Cabbil, C.C. [CH2M Hill / CH2M Hill Mound, Inc., 1075 Mound Road, Miamisburg, OH 45343 (United States)

2006-07-01T23:59:59.000Z

347

EA-1660: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1660: Final Environmental Assessment EA-1660: Final Environmental Assessment EA-1660: Final Environmental Assessment Combined Community Communications Facility and Infrastructure Cleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland, Washington This Environmental Assessment (EA) provides information and analyses of proposed U.S. Department of Energy (DOE) activities associated with consolidating existing communications operations and removing excess facilities and infrastructure within the Fitzner/Eberhardt Arid Lands Ecology Reserve (ALE) at the Hanford Site near the City of Richland, Washington. Environmental Assessment for the Combined Community Communications Facility and Infrastructure Cleanup on the Fitzner/Eberhardt Arid Lands Ecology Reserve, Hanford Site, Richland, Washington, DOE/EA-1660 (July 2009)

348

EA-1080: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0: Draft Environmental Assessment 0: Draft Environmental Assessment EA-1080: Draft Environmental Assessment Commercial Demonstration of the NOXSO SO2/NOX Removal Flue Gas Cleanup System This environmental assessment (EA) evaluates the potential impacts of a proposed demonstration project to be cost-shared by DOE and NOXSO Corporation under the terms of Clean Coal Technology (CCT) Demonstration Program. The project would demonstrate the NOXSO flue gas treatment technology, which is designed to reduce sulfur dioxide (SO2) and nitrogen oxides (NOX) emissions from existing coal-fired electric generating units. Draft Environmental Assessment for the Commercial Demonstration of the NOXSO SO2/NOX Removal Flue Gas Cleanup System, DOE/EA-1080 (June 1995) More Documents & Publications EA-1080: Finding of No Significant Impact

349

Cleanup and treatment (CAT) test: a land-area decontamination project utilizing a vacuum method of soil removal  

SciTech Connect

Areas 11 and 13 of the Nevada Test Site (NTS) are contaminated with varying concentrations of Pu-239, 240 and Am-241. An investigation of a vacuum method of soil removal, the Cleanup and Treatment (CAT) test, was conducted over a 3-month period in the plutonium safety shot or Plutonium Valley portion of Area 11. Soil in Plutonium Valley is of the Aridisol Order. The surface 0 to 10 cm is a gravelly loam, and is strongly alkaline (pH 8.8). A large truck-mounted vacuum unit, rather than conventional earth-moving equipment, was used as the primary soil collection unit. Effectiveness of the vacuum method of soil removal was evaluated in relation to conventional earthmoving procedures, particularly in terms of volume reduction of removed soil achieved over conventional techniques. Radiological safety considerations associated with use of the vacuum unit were evaluated in relation to their impact on a full-scale land decontamination program. Environmental and operational impacts of devegetation with retention of root crowns or root systems were investigated. It is concluded that the CAT test was successful under difficult environmental conditions.

Orcutt, J.A.

1982-08-01T23:59:59.000Z

350

Major Cold War Cleanup Milestone Reached at the Savannah River Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Major Cold War Cleanup Milestone Reached at the Savannah River Site Major Cold War Cleanup Milestone Reached at the Savannah River Site Major Cold War Cleanup Milestone Reached at the Savannah River Site March 29, 2012 - 10:37am Addthis WASHINGTON, DC - Today, the Energy Department announced it has reached a major milestone in the Department's efforts to clean up the Cold War legacy at the Savannah River Site (SRS) in South Carolina, laying the groundwork for closing two underground storage tanks that previously held radioactive liquid waste from nuclear weapons production at SRS. The determination signed by Energy Secretary Steven Chu paves the way for SRS to begin closing the massive tanks that make up the F Tank Farm. The site will start this year by closing two tanks that pose the greatest risk to the environment - Tanks 18 and 19. These tank closures will be the first

351

Oak Ridge's EM Program Seeks Public Input on Cleanup | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seeks Public Input on Cleanup Seeks Public Input on Cleanup Oak Ridge's EM Program Seeks Public Input on Cleanup April 25, 2013 - 12:00pm Addthis Oak Ridge’s EM leadership informed members of the public about projects and goals and answered questions during a public workshop this week. Oak Ridge's EM leadership informed members of the public about projects and goals and answered questions during a public workshop this week. Local residents and other stakeholders listen to Oak Ridge's EM senior leadership in a public workshop to learn about EM and provide input about future mission work. Local residents and other stakeholders listen to Oak Ridge's EM senior leadership in a public workshop to learn about EM and provide input about future mission work. Oak Ridge EM Manager Mark Whitney addresses participants on EM’s mission and priorities.

352

Sorption Mechanisms for Mercury Capture in Warm Post-Gasification Gas Clean-Up Systems  

NLE Websites -- All DOE Office Websites (Extended Search)

Sorption MechaniSMS for Mercury Sorption MechaniSMS for Mercury capture in WarM poSt-GaSification GaS clean-up SySteMS Background Power generation systems employing gasification technology must remove a variety of potential air pollutants, including mercury, from the synthetic gas steam prior to combustion. In general, efforts to remove mercury have focused on removal at lower temperatures (under 300 °F). The ability to remove mercury at warm-gas cleanup conditions (300 °F to 700 °F) or in the hot-gas cleanup range (above 1200 °F) would provide plant operators with greater flexibility to choose the treatment method best suited to conditions at their plant. The University of Arizona is investigating the use of paper waste-derived sorbents (PWDS) for the removal of mercury and other trace metals at temperatures in and

353

Cleanup of 77 Waste Sites Meets Two TPA Milestones: 1.2 million tons of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cleanup of 77 Waste Sites Meets Two TPA Milestones: 1.2 million Cleanup of 77 Waste Sites Meets Two TPA Milestones: 1.2 million tons of soil and debris disposed of from D, H Reactor Areas Cleanup of 77 Waste Sites Meets Two TPA Milestones: 1.2 million tons of soil and debris disposed of from D, H Reactor Areas January 11, 2012 - 12:00pm Addthis Media Contacts Cameron Hardy, DOE (509) 376-5365, Cameron.Hardy@rl.doe.gov Dieter Bohrmann, Ecology (509) 372-7954, Dieter.Bohrmann@ecy.wa.gov Emerald Laija, EPA (509) 376-4919, Laija.Emerald@epamail.epa.gov RICHLAND, WASH. - Department of Energy (DOE) contractor, Washington Closure Hanford, recently cleaned up 77 waste sites at Hanford to meet two Tri-Party Agreement (TPA) milestones before the end of 2011. The waste sites were located in the D and H Reactor Areas at Hanford along

354

Idaho Site Enlists Whey-Eating Microbes in Groundwater Cleanup | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho Site Enlists Whey-Eating Microbes in Groundwater Cleanup Idaho Site Enlists Whey-Eating Microbes in Groundwater Cleanup Idaho Site Enlists Whey-Eating Microbes in Groundwater Cleanup December 15, 2011 - 12:00pm Addthis Whey powder is used to reduce pH levels in the contaminated area. Whey powder is used to reduce pH levels in the contaminated area. This well is used to inject the protein source — whey powder — for microorganisms in an in situ bio- remediation process. This well is used to inject the protein source - whey powder - for microorganisms in an in situ bio- remediation process. Whey powder is used to reduce pH levels in the contaminated area. This well is used to inject the protein source - whey powder - for microorganisms in an in situ bio- remediation process. IDAHO FALLS, Idaho - Workers at the Idaho site have enlisted microbes to

355

Major Cold War Cleanup Milestone Reached at the Savannah River Site |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Major Cold War Cleanup Milestone Reached at the Savannah River Site Major Cold War Cleanup Milestone Reached at the Savannah River Site Major Cold War Cleanup Milestone Reached at the Savannah River Site March 29, 2012 - 10:37am Addthis WASHINGTON, DC - Today, the Energy Department announced it has reached a major milestone in the Department's efforts to clean up the Cold War legacy at the Savannah River Site (SRS) in South Carolina, laying the groundwork for closing two underground storage tanks that previously held radioactive liquid waste from nuclear weapons production at SRS. The determination signed by Energy Secretary Steven Chu paves the way for SRS to begin closing the massive tanks that make up the F Tank Farm. The site will start this year by closing two tanks that pose the greatest risk to the environment - Tanks 18 and 19. These tank closures will be the first

356

Oak Ridge Commemorates Past, Moves Forward with Cleanup of Historic K-25  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge Commemorates Past, Moves Forward with Cleanup of Historic Oak Ridge Commemorates Past, Moves Forward with Cleanup of Historic K-25 Site Oak Ridge Commemorates Past, Moves Forward with Cleanup of Historic K-25 Site August 1, 2012 - 12:00pm Addthis Workers near completion of the non-technetium area of K-25’s east wing (left). Oak Ridge anticipates beginning demolition on the North Tower (right) by October. Workers near completion of the non-technetium area of K-25's east wing (left). Oak Ridge anticipates beginning demolition on the North Tower (right) by October. OAK RIDGE, Tenn. - Representatives from federal, state, and local historic preservation groups gathered earlier this month to celebrate the formal completion of an agreement that preserves the historic contributions of Oak Ridge's K-25 site to the Manhattan Project and Cold War.

357

Oak Ridge Reflects on 30 Years of Cleanup | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Reflects on 30 Years of Cleanup Reflects on 30 Years of Cleanup Oak Ridge Reflects on 30 Years of Cleanup May 30, 2013 - 12:00pm Addthis Oak Ridge Office (ORO) of EM Deputy Manager Sue Cange, left to right, former ORO Manager Jim Hall, former ORO Manager Joe LaGrone, former ORO Manager Gerald Boyd, EM Senior Advisor Dave Huizenga and ORO EM Manager Mark Whitney take the stage after the showing of “30 Years in 30 Minutes.” Oak Ridge Office (ORO) of EM Deputy Manager Sue Cange, left to right, former ORO Manager Jim Hall, former ORO Manager Joe LaGrone, former ORO Manager Gerald Boyd, EM Senior Advisor Dave Huizenga and ORO EM Manager Mark Whitney take the stage after the showing of "30 Years in 30 Minutes." Displays at the event provide timelines and accomplishments of Oak Ridge’s EM program.

358

Cleanup Progresses at the Office of River Protection | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cleanup Progresses at the Office of River Protection Cleanup Progresses at the Office of River Protection Cleanup Progresses at the Office of River Protection December 24, 2013 - 12:00pm Addthis The concrete “core” is removed from Tank C-105 after workers cut a 55-inch hole in the tank dome. The concrete "core" is removed from Tank C-105 after workers cut a 55-inch hole in the tank dome. A composite image of dozens of individual-frame photos taken inside Tank C-110 provides a rare panoramic view of its interior. Portions of the tank floor and the Foldtrack waste-retrieval system are clearly visible. A composite image of dozens of individual-frame photos taken inside Tank C-110 provides a rare panoramic view of its interior. Portions of the tank floor and the Foldtrack waste-retrieval system are clearly visible.

359

Moab Marks 6-Million-Ton Cleanup Milestone | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Moab Marks 6-Million-Ton Cleanup Milestone Moab Marks 6-Million-Ton Cleanup Milestone Moab Marks 6-Million-Ton Cleanup Milestone June 20, 2013 - 12:00pm Addthis At Tuesday's Grand County Council meeting in Utah, Moab Federal Project Director Donald Metzler, center, moves a piece from a plaque representing Moab’s uranium mill tailings pile to a plaque representing the disposal cell in recognition of the site achieving a milestone by shipping 6 million tons of the tailings. Grand County Council Chair Gene Ciarus is on the left and Grand County Council Vice Chair Lynn Jackson is on the right. At Tuesday's Grand County Council meeting in Utah, Moab Federal Project Director Donald Metzler, center, moves a piece from a plaque representing Moab's uranium mill tailings pile to a plaque representing the disposal

360

Nevada National Security Site Cleanup Information Is Just a Click Away with  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nevada National Security Site Cleanup Information Is Just a Click Nevada National Security Site Cleanup Information Is Just a Click Away with Computer Map, Database - New Interactive Map Makes NNSS Data More Accessible to the Public Nevada National Security Site Cleanup Information Is Just a Click Away with Computer Map, Database - New Interactive Map Makes NNSS Data More Accessible to the Public December 27, 2012 - 12:00pm Addthis Shown here is a screenshot of the interactive map, which makes Nevada National Security Site data more accessible to the public. Shown here is a screenshot of the interactive map, which makes Nevada National Security Site data more accessible to the public. LAS VEGAS, NV - For decades, the Nevada Site Office (NSO) has been investigating, characterizing, identifying, and performing corrective

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Savannah River Site Makes Progress on Recovery Act-funded Cleanup |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Savannah River Site Makes Progress on Recovery Act-funded Cleanup Savannah River Site Makes Progress on Recovery Act-funded Cleanup Savannah River Site Makes Progress on Recovery Act-funded Cleanup February 9, 2011 - 12:00pm Addthis SRS loaded 14 standard waste boxes containing mixed and low-level waste that previously was classified as transuranic TRU waste. This shipment to a Florida treatment site marks the 1,000 cubic meter milestone of the 5,000 cubic meters in the Site’s TRU program that will be dispositioned through the Recovery Act. SRS loaded 14 standard waste boxes containing mixed and low-level waste that previously was classified as transuranic TRU waste. This shipment to a Florida treatment site marks the 1,000 cubic meter milestone of the 5,000 cubic meters in the Site's TRU program that will be dispositioned through

362

Evaluation and categorization of secondary system layup and cleanup practices for PWR plants  

Science Conference Proceedings (OSTI)

The EPRI Program S113-1, Evaluation of Secondary System Layup and Cleanup Proctices was established to study ways to minimize the transport of corrosion products into the secondary side PWR steam generators that occurs during plant startups following extended outages. As part of the EPRI Program, Task 200 objective was to identify and categorize the layup and cleanup practices now in use or proposed by utilities for PWR plants. The task study consisted of gathering information by conducting site visits to fourteen representative PWR plants in the USA, Europe and Japan, by conducting a search of the open literature, reviews of related EPRI Programs, and by evaluating the practices in terms of their potential effectiveness. The results show that about 30% of the plants attempt routine layup of secondary systems during outages and about 60% perform some form of system cleanup during the return to power following extended outages.

Cleary, W.F.

1982-12-01T23:59:59.000Z

363

U.S. and Canada Sign Statement of Intent on Nuclear Cleanup | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. and Canada Sign Statement of Intent on Nuclear Cleanup U.S. and Canada Sign Statement of Intent on Nuclear Cleanup U.S. and Canada Sign Statement of Intent on Nuclear Cleanup March 5, 2013 - 12:00pm Addthis Alice Williams of EM, left, and Joan Miller of the Atomic Energy of Canada Limited, sign a Statement of Intent (SOI). Alice Williams of EM, left, and Joan Miller of the Atomic Energy of Canada Limited, sign a Statement of Intent (SOI). DOE and the Atomic Energy of Canada Limited (AECL) signed a Statement of Intent (SOI) at the Waste Management Conference. The SOI enables information sharing on lessons learned and the development and application of new technologies and approaches to improve the safety, cost effectiveness and schedule of EM and the Canadian Nuclear Legacy Liabilities Program. EM's International Program and Office of Nuclear Materials Disposition

364

The Department of Energy Announces Major Cold War Legacy Waste Cleanup  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Department of Energy Announces Major Cold War Legacy Waste The Department of Energy Announces Major Cold War Legacy Waste Cleanup Milestone The Department of Energy Announces Major Cold War Legacy Waste Cleanup Milestone September 28, 2011 - 8:54am Addthis CARLSBAD, NM - The U.S. Department of Energy today announced that the Waste Isolation Pilot Plant (WIPP) received its 10,000th shipment of transuranic (TRU) waste over the weekend. This marks an important milestone in DOE's mission to clean up the country's Cold War legacy. "This accomplishment reflects the hard work and dedication of our workers and contractors," said Energy Secretary Steven Chu. "It also demonstrates the Department's commitment to future generations as we continue our cleanup mission as safely and quickly as possible." The 10,000th shipment, which consisted of defense-generated contact-handled

365

Cleanup Progresses at the Office of River Protection | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cleanup Progresses at the Office of River Protection Cleanup Progresses at the Office of River Protection Cleanup Progresses at the Office of River Protection December 24, 2013 - 12:00pm Addthis The concrete “core” is removed from Tank C-105 after workers cut a 55-inch hole in the tank dome. The concrete "core" is removed from Tank C-105 after workers cut a 55-inch hole in the tank dome. A composite image of dozens of individual-frame photos taken inside Tank C-110 provides a rare panoramic view of its interior. Portions of the tank floor and the Foldtrack waste-retrieval system are clearly visible. A composite image of dozens of individual-frame photos taken inside Tank C-110 provides a rare panoramic view of its interior. Portions of the tank floor and the Foldtrack waste-retrieval system are clearly visible.

366

Oak Ridge's EM Program Seeks Public Input on Cleanup | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Oak Ridge's EM Program Seeks Public Input on Cleanup Oak Ridge's EM Program Seeks Public Input on Cleanup Oak Ridge's EM Program Seeks Public Input on Cleanup April 25, 2013 - 12:00pm Addthis Oak Ridge’s EM leadership informed members of the public about projects and goals and answered questions during a public workshop this week. Oak Ridge's EM leadership informed members of the public about projects and goals and answered questions during a public workshop this week. Local residents and other stakeholders listen to Oak Ridge's EM senior leadership in a public workshop to learn about EM and provide input about future mission work. Local residents and other stakeholders listen to Oak Ridge's EM senior leadership in a public workshop to learn about EM and provide input about future mission work. Oak Ridge EM Manager Mark Whitney addresses participants on EM’s mission and priorities.

367

Oak Ridge Commemorates Past, Moves Forward with Cleanup of Historic K-25  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Commemorates Past, Moves Forward with Cleanup of Historic Commemorates Past, Moves Forward with Cleanup of Historic K-25 Site Oak Ridge Commemorates Past, Moves Forward with Cleanup of Historic K-25 Site August 1, 2012 - 12:00pm Addthis Workers near completion of the non-technetium area of K-25’s east wing (left). Oak Ridge anticipates beginning demolition on the North Tower (right) by October. Workers near completion of the non-technetium area of K-25's east wing (left). Oak Ridge anticipates beginning demolition on the North Tower (right) by October. OAK RIDGE, Tenn. - Representatives from federal, state, and local historic preservation groups gathered earlier this month to celebrate the formal completion of an agreement that preserves the historic contributions of Oak Ridge's K-25 site to the Manhattan Project and Cold War.

368

U.S. and Canada Sign Statement of Intent on Nuclear Cleanup | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

U.S. and Canada Sign Statement of Intent on Nuclear Cleanup U.S. and Canada Sign Statement of Intent on Nuclear Cleanup U.S. and Canada Sign Statement of Intent on Nuclear Cleanup March 5, 2013 - 12:00pm Addthis Alice Williams of EM, left, and Joan Miller of the Atomic Energy of Canada Limited, sign a Statement of Intent (SOI). Alice Williams of EM, left, and Joan Miller of the Atomic Energy of Canada Limited, sign a Statement of Intent (SOI). DOE and the Atomic Energy of Canada Limited (AECL) signed a Statement of Intent (SOI) at the Waste Management Conference. The SOI enables information sharing on lessons learned and the development and application of new technologies and approaches to improve the safety, cost effectiveness and schedule of EM and the Canadian Nuclear Legacy Liabilities Program. EM's International Program and Office of Nuclear Materials Disposition

369

Seventh Chapter of Hanford Story Released to Public: Chapter Covers Cleanup  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Seventh Chapter of Hanford Story Released to Public: Chapter Covers Seventh Chapter of Hanford Story Released to Public: Chapter Covers Cleanup along Columbia River - Breathtaking river views...nice graphics...glimpses of the future of Hanford Seventh Chapter of Hanford Story Released to Public: Chapter Covers Cleanup along Columbia River - Breathtaking river views...nice graphics...glimpses of the future of Hanford June 20, 2012 - 12:00pm Addthis Media Contact Geoff Tyree Public Affairs, Richland Operations Office U.S. Department of Energy geoffrey.tyree@rl.doe.gov 509-376-4171 RICHLAND, Wash. - The Department of Energy is releasing the seventh chapter of The Hanford Story video series to the public today. "River Corridor" provides viewers with a look at the cleanup of hundreds of contaminated buildings and more than one thousand areas where soil was

370

The Department of Energy's Office of Environmental Management's Budget Allocation Plan, OAS-L-12-03  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

The Department of Energy's Office The Department of Energy's Office of Environmental Management's Budget Allocation Plan OAS-L-12-03 March 2012 Department of Energy Washington, DC 20585 March 15, 2012 MEMORANDUM FOR THE SENIOR ADVISOR FOR ENVIRONMENTAL MANAGEMENT FROM: Daniel M. Weeber, Director Eastern Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Office of Environmental Management's Budget Allocation Plan" BACKGROUND The Department of Energy's Office of Environmental Management is tasked with managing the technically challenging risks posed by the world's largest nuclear cleanup effort. At the end of Fiscal Year 2010, EM had responsibility for nuclear cleanup activities at 18 sites covering more

371

Environmental waste disposal contracts awarded  

NLE Websites -- All DOE Office Websites (Extended Search)

Environmental contracts awarded locally Environmental contracts awarded locally Environmental waste disposal contracts awarded locally Three small businesses with offices in Northern New Mexico awarded nuclear waste clean-up contracts. April 3, 2012 Worker moves drums of transuranic (TRU) waste at a staging area A worker stages drums of transuranic waste at Los Alamos National Laboratory's Technical Area 54. the Lap ships such drums to the U.S. Department of Energy's Waste Isolation Pilot Plant (WIPP) in Southern New Mexico. The Lab annually averages about 120 shipments of TRU waste to WIPP. Contact Small Business Office (505) 667-4419 Email "They will be valuable partners in the Lab's ability to dispose of the waste safely and efficiently." Small businesses selected for environmental work at LANL

372

Environmental engineering and analysis: Final report  

DOE Green Energy (OSTI)

One of the primary missions of the Department of Energy's Morgantown Energy Technology Center (METC) is the development of an information and data base on the engineering and environmental aspects of advanced technologies for the conversion of relatively abundant energy sources, such as coal, to clean fuels. Such fuels may be suitable for a number of end uses, including substitute natural gas, fuel gas for use in gas turbines, and others. METC has provided support for the development of a number of synfuels technologies, including the Mountain Fuel Resources (MFR) and Kellogg-Rust/Westinghouse (KRW) gasification technologies, and several raw gas and aqueous waste cleanup technologies. The primary objective of this project was to obtain and evaluate environmental data for advanced synthetic fuel technologies of interest to the Department of Energy as well as associated pollution controls, such as gas cleanup and wastewater treatment technologies.

Skinner, F.D.

1989-03-01T23:59:59.000Z

373

Environmental Management Science Program Workshop. Proceedings  

SciTech Connect

The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

1998-07-01T23:59:59.000Z

374

Environmental Management Science Program Workshop. Proceedings  

SciTech Connect

The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

None

1998-07-01T23:59:59.000Z

375

Environmental Compliance Performance Scorecard - First Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - First Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2013 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Third

376

Environmental Compliance Performance Scorecard - Third Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - Third Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011

377

Environmental Compliance Performance Scorecard - First Quarter FY2013 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 3 Environmental Compliance Performance Scorecard - First Quarter FY2013 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2013 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2011 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - First Quarter FY2010

378

Environmental Compliance Performance Scorecard - First Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - First Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2012

379

Environmental Compliance Performance Scorecard - Third Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - Third Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012

380

Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

09 09 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010 Environmental Compliance Performance Scorecard - Second Quarter FY2010

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - First

382

Environmental Compliance Performance Scorecard - Second Quarter FY2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Environmental Compliance Performance Scorecard - Second Quarter FY2010 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2010 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2010 Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009

383

Environmental Compliance Performance Scorecard - Second Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 1 Environmental Compliance Performance Scorecard - Second Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2010 Environmental Compliance Performance Scorecard - First Quarter FY2011

384

Environmental Compliance Performance Scorecard - Third Quarter FY2010 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 0 Environmental Compliance Performance Scorecard - Third Quarter FY2010 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Third Quarter FY2010 More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2011 Environmental Compliance Performance Scorecard - Third Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010

385

Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

2 2 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012

386

Cleanup Verification Package for the 126-F-1, 184-F Powerhouse Ash Pit  

Science Conference Proceedings (OSTI)

This cleanup verification package documents completion of remedial action for the 126-F-1, 184-F Powerhouse Ash Pit. This waste site received coal ash from the 100-F Area coal-fired steam plant. Leakage of process effluent from the 116-F-14 , 107-F Retention Basins flowed south into the ash pit, contaminating the northern portion.

S. W. Clark and H. M. Sulloway

2007-09-26T23:59:59.000Z

387

Cleanup Verification Package for the 126-F-1, 184-F Powerhouse Ash Pit  

SciTech Connect

This cleanup verification package documents completion of remedial action for the 126-F-1, 184-F Powerhouse Ash Pit. This waste site received coal ash from the 100-F Area coal-fired steam plant. Leakage of process effluent from the 116-F-14 , 107-F Retention Basins flowed south into the ash pit, contaminating the northern portion.

S. W. Clark and H. M Sulloway

2007-10-31T23:59:59.000Z

388

Spent Fuel Pool Cooling and Cleanup During Decommissioning: Experience at Trojan Nuclear Power Plant  

Science Conference Proceedings (OSTI)

Operation of original in-plant spent fuel pool facilities at shutdown power plants is expensive compared to available alternatives and can interfere with the decommissioning process. This report describes the approach taken in the Trojan Decommissioning Project to establish independent cooling and cleanup services for the fuel pool until the spent fuel is placed in dry storage.

1999-03-15T23:59:59.000Z

389

Cleanup Verification Package for the 118-C-1, 105-C Solid Waste Burial Ground  

Science Conference Proceedings (OSTI)

This cleanup verification package documents completion of remedial action for the 118-C-1, 105-C Solid Waste Burial Ground. This waste site was the primary burial ground for general wastes from the operation of the 105-C Reactor and received process tubes, aluminum fuel spacers, control rods, reactor hardware, spent nuclear fuel and soft wastes.

M. J. Appel and J. M. Capron

2007-07-25T23:59:59.000Z

390

Flibe Coolant Cleanup and Processing in the HYLIFE-II Inertial Fusion Energy Power Plant  

SciTech Connect

In the HYLIFE-II chamber design, a thick flowing blanket of molten-salt (Li{sub 2}BeF{sub 4}) called flibe is used to protect structures from radiation damage. Since it is directly exposed to the fusion target, the flibe will absorb the target debris. Removing the materials left over from target explosions at the rate of {approx}6/s and then recycling some of these materials poses a challenge for the inertial fusion energy power plant. The choice of target materials derives from multi-disciplinary criteria such as target performance, fabricability, safety and environment, corrosion, and cost of recycle. Indirect-drive targets require high-2 materials for the hohlraum. Gold and gadolinium are favorite target materials for laboratory experiments but cost considerations may preclude their use in power plants or at least requires cost effective recycle because a year's supply of gold and gadolinium is estimated at 520 M$ and 40 M$. Environmental and waste considerations alone require recycle of this material. Separation by volatility appears to be the most attractive (e.g., Hg and Xe); centrifugation (e.g., Pb) is acceptable with some problems (e.g., materials compatibility) and chemical separation is the least attractive (e.g. Gd and Hf). Mercury, hafnium and xenon might be substituted with equal target performance and have advantages in removal and recycle due to their high volatility, except for hafnium. Alternatively, lead, tungsten and xenon might be used due to the ability to use centrifugation and gaseous separation. Hafnium or tantalum form fluorides, which will complicate materials compatibility, corrosion and require sufficient volatility of the fluoride for separation. Further complicating the coolant cleanup and processing is the formation of free fluorine due to nuclear transformation of lithium and beryllium in the flibe, which requires chemical control of the fluoride level to minimize corrosion. The study of the choice of target materials and the appropriate processing needs further study because we have not come up with choices which perform as well as gold and gadolinium and which have practical processes for recovery and recycle.

Moir, R W

2001-03-23T23:59:59.000Z

391

Task 6.5 - Gas Separation and Hot-Gas Cleanup  

DOE Green Energy (OSTI)

Catalytic gasification of coal to produce H{sub 2}- and CH{sub 4}-rich gases for consumption in molten carbonate fuel cells is currently under development; however, to optimize the fuel cell performance and extend its operating life, it is desired to separate as much of the inerts (i.e., CO{sub 2} and N{sub 2}) and impurities (i.e., H{sub 2}S and NH{sub 3}) as possible from the fuel gas before they enter the fuel cell. In addition, the economics of the integrated gasification combined cycle (IGCC) can be improved by separating as much of the hydrogen as possible from the fuel, since hydrogen is a high-value product. One process currently under development by the Energy & Environmental Research Center (EERC) for accomplishing this gas separation and hot-gas cleanup involves gas separation membranes. These membranes are operated at temperatures as high as 800 C and pressures up to 300 psig. Some of these membranes can have very small pores (30-50 {angstrom}), which inefficiently separate the undesired gases by operating in the Knudsen diffusion region of mass transport. Other membranes with smaller pore sizes (<5 {angstrom}) operate in the molecular sieving region of mass transport phenomena, Dissolution of atomic hydrogen into thin metallic membranes made of platinum and palladium alloys is also being developed. Technological and economic issues that must be resolved before gas separation membranes are commercially viable include improved gas separation efficiency, membrane optimization, sealing of membranes in pressure vessels, high burst strength of the ceramic material, pore thermal stability, and material chemical stability. Hydrogen separation is dependent on the temperature, pressure, pressure ratio across the membrane, and ratio of permeate flow to total flow. For gas separation under Knudsen diffusion, increasing feed pressure and pressure ratio across the membrane should increase gas permeability; decreasing the temperature and the permeate-to-total flow ratio should also increase gas permeability. In the molecular sieving regime of mass transport, the inlet pressure and pressure ratio should have no effect on gas permeability, while increasing temperature should increase permeability.

Swanson, Michael L.; Ness Jr., Robert O.; Hurley, John P.; McCollor, Donald P.

1997-06-01T23:59:59.000Z

392

EA-1867: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Assessment Draft Environmental Assessment EA-1867: Draft Environmental Assessment RTI International Scale-Up of High-Temperature Syngas Cleanup and Carbon Capture and Sequestration Technologies, Polk County, Florida (October 2011) DOE prepared this Draft EA to evaluate the potential environmental consequences of its Proposed Action to provide cost-shared funding to RTI International (RTI) for its proposed project to demonstrate the precommercial scale-up of RTI's high-temperature syngas cleanup and carbon capture and sequestration technologies. Approximately $168.8 million of DOE's total $171.8 million funding for the proposed project would be provided from funds authorized in the American Recovery and Reinvestment Act of 2009 (Public Law 111-5, 123 Stat. 115). RTI's

393

EA-1867: Final Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Final Environmental Assessment Final Environmental Assessment EA-1867: Final Environmental Assessment RTI International Scale-Up of High-Temperature Syngas Cleanup and Carbon Capture and Sequestration Technologies, Polk County, Florida (October 2011) For more information, contact: Mr. Mark W. Lusk U.S. Department of Energy National Energy Technology Laboratory 3610 Collins Ferry Road P.O. Box 880, MS B07 Morgantown, West Virginia 26507-0880 Electronic mail: mark.lusk@netl.doe.gov Abstract: DOE prepared this EA to evaluate the potential environmental consequences of its Proposed Action to provide cost-shared funding to RTI International (RTI) for its proposed project to demonstrate the precommercial scale-up of RTI's high-temperature syngas cleanup and carbon capture and sequestration technologies. Approximately $168.8 million of DOE's

394

EA-1793: Draft Environmental Assessment | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3: Draft Environmental Assessment 3: Draft Environmental Assessment EA-1793: Draft Environmental Assessment Replacement Capability for Disposal of Remote-Handled Low-Level Radioactive Waste Generated at the Department of Energy's Idaho Site The U.S. Department of Energy (DOE) proposes to provide replacement capability for disposal of remote-handled low-level radioactive waste (LLW) generated at the Idaho National Laboratory (INL) site beginning in October 2017. Historically, INL has disposed of this LLW onsite. However, the existing disposal area located within the INL Radioactive Waste Management Complex will undergo closure as part of ongoing cleanup of INL and will not be available after 2017. The proposed project to establish replacement capability is not a DOE Environmental Management Idaho Cleanup Project

395

US Department of Energy`s high-temperature and high-pressure particulate cleanup for advanced coal-based power systems  

Science Conference Proceedings (OSTI)

The availability of reliable, low-cost electricity is a cornerstone for the United States` ability to compete in the world market. The Department of Energy (DOE) projects the total consumption of electricity in the US to rise from 2.7 trillion kilowatt-hours in 1990 to 3.5 trillion in 2010. Although energy sources are diversifying, fossil fuel still produces 90 percent of the nation`s energy. Coal is our most abundant fossil fuel resource and the source of 56 percent of our electricity. It has been the fuel of choice because of its availability and low cost. A new generation of high-efficiency power systems has made it possible to continue the use of coal while still protecting the environment. Such power systems greatly reduce the pollutants associated with cola-fired plants built before the 1970s. To realize this high efficiency and superior environmental performance, advanced coal-based power systems will require gas stream cleanup under high-temperature and high-pressure (HTHP) process conditions. Presented in this paper are the HTHP particulate capture requirements for the Integrated Gasification Combined Cycle (IGCC) and Pressurized Fluidized-Bed Combustion (PFBC) power systems, the HTHP particulate cleanup systems being implemented in the PFBC and IGCC Clean Coal Technology (CCT) Projects, and the currently available particulate capture performance results.

Dennis, R.A.

1997-05-01T23:59:59.000Z

396

Databases and Tools | Waste and Cleanup Risk Assessment | OSWER | USEPA  

NLE Websites -- All DOE Office Websites (Extended Search)

Radionuclides (RSSG) Radionuclides (RSSG) RSSG Home RSSG Search Soil Screening Guidance for Radionuclides Topics for Key Radiation Guidances and Reports These calculations are based on the U.S. Environmental Protection Agency's (EPA) Soil Screening Guidance for Radionuclides. The guidance must be read before attempting to calculate values. The guidance is available through: Soil Screening Guidance for Radionuclides: User's Guide EPA Document Number: EPA/540-R-00-007 Soil Screening Guidance for Radionuclides: Technical Background Document EPA Document Number: EPA/540-R-00-006, October 2000 Highlight 1: Key Attributes of the Soil Screening Guidance for Radionuclides Standardized equations are presented to address human exposure pathways in a residential setting consistent with Superfund's concept of "Reasonable Maximum Exposure" (RME).

397

Categorical Exclusion 4596: High Contamination Area (HCA) Cleanup Project  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Detennination Form Detennination Form PropQsed Action Tit!~: High Contamination Area (HCA) C!e;;Jnup Project (4596) Pro~ram or Field Offif.s: Y-12 Site OffiCe Locmion(s) (City/CountvLState): Oak Ridge, Anderson County, Tennessee Prot?Oscd Action Description: PAGE 02/04 l,:·:~:.s:~.t?)fuiW6v:: ~ 4fB~ir:::8~1 The proposed action is to disposition the materiels and equipment stored in a radiological high contamination area (HCA). This area is paved and fenced with no roof or shelter. Tile HCA was used as an accumulation area for rad contaminated materials and equipment from operations. Categorical Exclusion(s) Avoli!¢l: 81.3- ~outine maintenance For the complete DOE National Environmental Policy Act regulnti011s regaruing categorical exclusions, including the full text of each

398

Environmental Education and Development Program  

SciTech Connect

The Environmental Education and Development Program is a component on the effort to accomplish the Office of Environmental Restoration and Waste Management`s (EM) goal of environmental compliance and cleanup of the 1989 inventory of inactive DOE sites and facilities by the year 2019. Education and Development programs were designed specifically to stimulate the knowledge and workforce capability necessary to achieve EM goals while contributing to DOE`s overall goal of increasing scientific and technical literacy and competency. The primary implementation criterion for E&D activities involved a focus on programs and projects that had both immediate and long-range leveraging effects on infrastructure. This focus included programs that yielded short term results (one to five years), as well as long-term results, to ensure a steady supply of appropriately trained and educated human resources, including women and minorities, to meet EM`s demands.

Not Available

1994-03-01T23:59:59.000Z

399

Integrated low emissions cleanup system for coal fueled turbines Phase III bench-scale testing and evaluation  

SciTech Connect

The United States Department of Energy, Morgantown Energy Research Center (DOE/METC), is sponsoring the development of coal-fired turbine technologies such as Pressurized Fluidized Bed Combustion (PFBC), coal Gasification Combined Cycles (GCC), and Direct Coal-Fired Turbines (DCFT). A major technical development challenge remaining for coal-fired turbine systems is high-temperature gas cleaning to meet environmental emissions standards, as well as to ensure acceptable turbine life. The Westinghouse Electric Corporation, Science & Technology Center, has evaluated an Integrated Low Emissions Cleanup (ILEC) concept that has been configured to meet this technical challenge. This ceramic hot gas filter (HGF), ILEC concept controls particulate emissions, while simultaneously contributing to the control of sulfur and alkali vapor contaminants in high-temperature, high-pressure, fuel gases or combustion gases. This document reports on the results of Phase III of the ILEC evaluation program, the final phase of the program. In Phase III, a bench-scale ILEC facility has been tested to (1) confirm the feasibility of the ILEC concept, and (2) to resolve some major filter cake behavior issues identified in PFBC, HGF applications.

Newby, R.A.; Alvin, M.A.; Bachovchin, D.M. [and others

1995-08-01T23:59:59.000Z

400

Hanford Site cleanup and transition: Risk data needs for decision making (Hanford risk data gap analysis decision guide)  

SciTech Connect

Given the broad array of environmental problems, technical alternatives, and outcomes desired by different stakeholders at Hanford, DOE will have to make difficult resource allocations over the next few decades. Although some of these allocations will be driven purely by legal requirements, almost all of the major objectives of the cleanup and economic transition missions involve choices among alternative pathways. This study examined the following questions: what risk information is needed to make good decisions at Hanford; how do those data needs compare to the set(s) of risk data that will be generated by regulatory compliance activities and various non-compliance studies that are also concerned with risk? This analysis examined the Hanford Site missions, the Hanford Strategic Plan, known stakeholder values, and the most important decisions that have to be made at Hanford to determine a minimum domain of risk information required to make good decisions that will withstand legal, political, and technical scrutiny. The primary risk categories include (1) public health, (2) occupational health and safety, (3) ecological integrity, (4) cultural-religious welfare, and (5) socio-economic welfare.

Gajewski, S.; Glantz, C.; Harper, B.; Bilyard, G.; Miller, P.

1995-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Integrated low emissions cleanup system for direct coal fueled turbines (moving bed, fluid bed contactor/ceramic filter)  

SciTech Connect

The United States Department of Energy, Morgantown Energy Research Center (DOE/METC), is sponsoring the development of direct coal-fired turbine power plants as part of their Heat Engines program. A major technical challenge remaining for the development of the direct coal-fired turbine is high-temperature combustion gas cleaning to meet environmental standards for sulfur oxides and particulate emissions, as well as to provide acceptable turbine life. The Westinghouse Electric Corporation, Science Technology Center, is evaluating two Integrated Low Emissions Cleanup (ILEC) concepts that have been configured to meet this technical challenge: a baseline ceramic barrier filter nEC concept, and a fluidized bed ILEC concept. These ILEC concepts simultaneously control sulfur, particulate, and alkali contaminants in the high-pressure combustion gases at turbine inlet temperatures up to 2300[degrees]F. This document reports the status of a program in the eighteenth quarter to develop this ILEC technology for direct coal-fired turbine power plants.

Newby, R.A.; Alvin, M.A.; Bachovchin, D.M.; Yang, W.C.; Smeltzer, E.E.; Lippert, T.E.

1992-04-20T23:59:59.000Z

402

DOE's Offices of Environmental  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Statement of Intent (SOI) Statement of Intent (SOI) between the US Dept of Energy (DOE) and the UK Nuclear Decommissioning Authority (NDA) on decommissioning and waste management was renewed for a further five years during the Waste Management conference in Phoenix, AZ in March. The signatories to the SOI were the DOE's Offices of Environmental Management (EM) and Nuclear Energy (NE) and the NDA, with NE being a new addition to the arrangement. The Office of Environment Management is responsible for the clean-up of the former nuclear weapons' sites and the relationship between them and the NDA has already resulted in collaboration in a number of areas such as thermal treatments for stabilization of wastes, plutonium management, aging facilities management, non-standard fuels

403

Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 2: Gas Cleanup Design and Cost Estimates -- Wood Feedstock  

DOE Green Energy (OSTI)

As part of Task 2, Gas Cleanup and Cost Estimates, Nexant investigated the appropriate process scheme for treatment of wood-derived syngas for use in the synthesis of liquid fuels. Two different 2,000 metric tonne per day gasification schemes, a low-pressure, indirect system using the gasifier, and a high-pressure, direct system using gasification technology were evaluated. Initial syngas conditions from each of the gasifiers was provided to the team by the National Renewable Energy Laboratory. Nexant was the prime contractor and principal investigator during this task; technical assistance was provided by both GTI and Emery Energy.

Nexant Inc.

2006-05-01T23:59:59.000Z

404

NETL: Gasification - Recovery Act: High Temperature Syngas Cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

Program Background and Project Benefits Program Background and Project Benefits Gasification is used to convert a solid feedstock, such as coal, petcoke, or biomass, into a gaseous form, referred to as synthesis gas or syngas, which is primarily hydrogen and carbon monoxide. With gasification-based technologies, pollutants can be captured and disposed of or converted to useful products. Gasification can generate clean power by adding steam to the syngas in a water-gas-shift reactor to convert the carbon monoxide to carbon dioxide (CO2) and to produce additional hydrogen. The hydrogen and CO2 are separated-the hydrogen is used to make power and the CO2 is sent to storage, converted to useful products or used for EOR. In addition to efficiently producing electric power, a wide range of transportation fuels and chemicals can be produced from the cleaned syngas, thereby providing the flexibility needed to capitalize on the changing economic market. As a result, gasification provides a flexible technology option for using domestically available resources while meeting future environmental emission standards. Polygeneration plants that produce multiple products are uniquely possible with gasification technologies. The Gasification Systems program is developing technologies in three key areas to reduce the cost and increase the efficiency of producing syngas: (1) Feed Systems, (2) Gasifier Optimization and Plant Supporting Systems, and (3) Syngas Processing Systems.

405

Environmental Management and Reservation Activities 3-1 3. Environmental Management and Reservation  

E-Print Network (OSTI)

N CO . ETTP ORNL Y-12 ORNL-DWG 95M-7718 0 1 2 0 3 MILES KM N O AK RID GE TURNPIKE DOE OAK RIDGE For nearly half a century, one of the primary missions of DOE and its predecessor agencies was the production of and are involved in making cleanup decisions. In 1990, DOE-HQ established the Office of Environmental Management

Pennycook, Steve

406

Proceedings of Workshop on Uranium Production Environmental Restoration: An exchange between the United States and Germany  

SciTech Connect

Scientists, engineers, elected officials, and industry regulators from the United, States and Germany met in Albuquerque, New Mexico, August 16--20, 1993, in the first joint international workshop to discuss uranium tailings remediation. Entitled ``Workshop on Uranium Production Environmental Restoration: An Exchange between the US and Germany,`` the meeting was hosted by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The goal of the workshop was to further understanding and communication on the uranium tailings cleanup projects in the US and Germany. Many communities around the world are faced with an environmental legacy -- enormous quantities of hazardous and low-level radioactive materials from the production of uranium used for energy and nuclear weapons. In 1978, the US Congress passed the Uranium Mill Tailings Radiation Control Act. Title I of the law established a program to assess the tailings at inactive uranium processing sites and provide a means for joint federal and state funding of the cleanup efforts at sites where all or substantially all of the uranium was produced for sale to a federal agency. The UMTRA Project is responsible for the cleanup of 24 sites in 10 states. Germany is facing nearly identical uranium cleanup problems and has established a cleanup project. At the workshop, participants had an opportunity to interact with a broad cross section of the environmental restoration and waste disposal community, discuss common concerns and problems, and develop a broader understanding of the issues. Abstracts are catalogued individually for the data base.

Not Available

1993-12-31T23:59:59.000Z

407

The increasing importance of risk assessment and management in environmental decision-making  

SciTech Connect

Because environmental problems are growing and resources for dealing with them are shrinking, the environmental movement is witnessing an evolutionary shift toward greater emphasis on the use of risk assessment and management tools in setting environmental standards, determining levels of cleanup and deciding environmental program funding priorities. This change has important ramifications for the Department of Energy (DOE) and its national laboratories in terms of the costs of weapons facilities cleanup, the types of cleanup technology that will be emphasized and the way the DOE programs will be run. Other Federal agencies responsible for cleanup operations [e.g., the Environmental Protection Agency (EPA) and the Department of Defense (DOD)] will be similarly affected. This paper defines risk management and risk assessment and explains why these concepts will be of growing importance in the 1990s. It also defines other relevant terms. The paper develops a rationale for why risk assessment and management will be of increasing importance in environmental decision-making in the 1990s and beyond.

Jaksch, J.A.

1992-06-01T23:59:59.000Z

408

Integrated low emissions cleanup system for direct coal fueled turbines (moving bed, fluid bed contactor/ceramic filter). Twenty-third quarterly status report, April--June 1993  

SciTech Connect

The United States Department of Energy, Morgantown Energy Research Center (DOE/METC), is sponsoring the development of direct coal-fired turbine power plants as part of their Heat Engines program. A major technical challenge remaining for the development of the direct coal-fired turbine is high-temperature combustion gas cleaning to meet environmental standards for sulfur oxides and particulate emissions, as well as to provide acceptable turbine life. The Westinghouse Electric Corporation, Science & Technology Center, is evaluating two Integrated Low Emissions Cleanup (ILEC) concepts that have been configured to meet this technical challenge: A baseline ceramic barrier filter ILEC concept, and a fluidized bed ILEC concept. These ILEC concepts simultaneously control sulfur, particulate, and alkali contaminants in the high-pressure combustion gases at turbine inlet temperatures up to 2300{degrees}F. This document reports the status of a program in the nineteenth quarter to develop this ILEC technology for direct coal-fired turbine power plants.

Newby, R.A.; Alvin, M.A.; Bachovchin, D.M.; Yang, W.C.; Smeltzer, E.E.; Lippert, T.E.

1993-07-19T23:59:59.000Z

409

Integrated Low Emissions Cleanup system for direct coal fueled turbines (moving bed, fluid contactor/ceramic filter). Twenty-second quarterly status report, January--March 1993  

SciTech Connect

The United States Department of Energy, Morgantown Energy Research Center (DOE/METC), is sponsoring the development of direct coal-fired turbine power plants as part of their Heat Engines program. A major technical challenge remaining for the development of the direct coal-fired turbine is high-temperature combustion gas cleaning to meet environmental standards for sulfur oxides and particulate emissions, as well as to provide acceptable turbine life. The Westinghouse Electric Corporation, Science & Technology Center, is evaluating two Integrated Low Emissions Cleanup (ILEC) concepts that have been configured to meet this technical challenge: A baseline ceramic barrier filter ILEC concept, and a fluidized bed ILEC concept. These ILEC concepts simultaneously control sulfur, particulate, and alkali contaminants in the high-pressure combustion gases at turbine inlet temperatures up to 2300{degrees}F. This document reports the status of a program in the nineteenth quarter to develop this ILEC technology for direct coal-fired turbine power plants.

Newby, R.A.; Alvin, M.A.; Bachovchin, D.M.; Yang, W.C.; Smeltzer, E.E.; Lippert, T.E.

1993-10-01T23:59:59.000Z

410

Integrated low emissions cleanup system for direct coal fueled turbines (moving bed, fluid bed contactor/ceramic filter). Twentieth quarterly status report, July--September 1992  

SciTech Connect

The United States Department of Energy, Morgantown Energy Research Center (DOE/METC), is sponsoring the development of direct coal-fired turbine power plants as part of their Heat Engines program. A major technical challenge remaining for the development of the direct coal-fired turbine is high-temperature combustion gas cleaning to meet environmental standards for sulfur oxides and particulate emissions, as well as to provide acceptable turbine life. The Westinghouse Electric Corporation, Science & Technology Center, is evaluating two Integrated Low Emissions Cleanup (ILEC) concepts that have been configured to meat this technical challenge: a baseline ceramic barrier filter ILEC concept, and a fluidized bed ILEC concept. These ILEC concepts simultaneously control sulfur, particulate, and alkali contaminants in the high-pressure combustion gases at turbine inlet temperatures up to 2300{degree}F. This document reports the status of a program in the nineteenth quarter to develop this ILEC technology for direct coal-fired turbine power plants.

Newby, R.A.; Alvin, M.A.; Bachovchin, D.M.; Yang, W.C.; Smeltzer, E.E.; Lippert, T.E.

1992-10-20T23:59:59.000Z

411

Integrated low emissions cleanup system for direct coal fueled turbines (moving bed, fluid bed contactor/ceramic filter). Twenty-ninth quarterly status report, October--December 1994  

SciTech Connect

The United States Department of Energy, Morgantown Energy Research Center (DOE/METC), is sponsoring the development of advanced, coal-fueled turbine power plants such as pressurized fluid bed combustion and coal gasification combined cycles. A major technical challenge remaining for the development of the coal-fueled turbine is high-temperature gas cleaning to meet environmental standards for sulfur oxides and particulate emissions, as well as to provide acceptable turbine life. The Westinghouse Electric Corporation, Science & Technology Center, is evaluating Integrated Low Emissions Cleanup (ILEC) concepts that have been configured to meet this technical challenge. These ILEC concepts simultaneously control sulfur, particulate, and alkali contaminants in the high-pressure process gases. This document reports the status of a program in the twenty-seventh quarter to develop this ILEC technology.

Newby, R.A.; Alvin, M.A.; Bachovchin, D.M. [and others

1996-02-01T23:59:59.000Z

412

Integrated Low Emissions Cleanup system for direct coal fueled turbines, (moving bed, fluid bed contactor/ceramic filter). Twenty-fourth quarterly status report, July--September 1993  

SciTech Connect

The United States Department of Energy, Morgantown Energy Research Center (DOE/METC), is sponsoring the development of direct coal-fired turbine power plants as part of their Heat Engines program. A major technical challenge remaining for the development of the direct coal-fired turbine is high-temperature combustion gas cleaning to meet environmental standards for sulfur oxides and particulate emissions, as well as to provide acceptable turbine life. The Westinghouse Electric Corporation, Science & Technology Center, is evaluating two Integrated Low Emissions Cleanup (ILEC) concepts that have been configured to meet this technical challenge: a baseline ceramic barrier filter ILEC concept, and a fluidized bed ILEC concept. These ILEC concepts simultaneously control sulfur, particulate, and alkali contaminants in the high-pressure combustion gases at turbine inlet temperatures up to 2300{degree}F. This document reports the status of a program in the nineteenth quarter to develop this ILEC technology for direct coal-fired turbine power plants.

Newby, R.A.; Alvin, M.A.; Bachovchin, D.M.; Yang, W.C.; Smeltzer, E.E.; Lippert, T.E.

1993-12-31T23:59:59.000Z

413

THE ENVIRONMENTAL TECHNOLOGIES ACCEPTANCE (ETA) PROGRAM  

Science Conference Proceedings (OSTI)

The Environmental Technologies Acceptance (ETA) Program at the Energy and Environmental Research Center (EERC) is intended to advance the development, commercial acceptance, and timely deployment of selected private sector technologies for the cleanup of sites in the nuclear defense complex as well as the greater market. As shown in Table 1, this cooperative agreement funded by the National Energy Technology Laboratory (NETL) consists of three tasks: Technology Selection, Technology Development, and Technology Verification. As currently conceived, the ETA will address the needs of as many technologies as appropriate under its current 3-year term. This report covers activities during the first 6 months of the 3-year ETA program.

Christina B. Behr-Andres

2001-04-01T23:59:59.000Z

414

Definition of Environmental Management (EM) Completion  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

D D D e e f f i i n n i i t t i i o o n n o o f f E E M M C C o o m m p p l l e e t t i i o o n n a a n n d d D D O O E E S S i i t t e e C C l l o o s s u u r r e e This fact sheet defines critical points in the cleanup process, specifies where the Office of Environmental Management (EM) programmatic responsibility ends, and clarifies the responsibilities of other Program Secretarial Offices managing a site after EM's mission is complete. Accordingly, these definitions serve as the framework for developing or revising strategic plans, site baselines, and implementation plans. Environmental Management (Cleanup) includes those activities necessary to evaluate and mitigate a release or threat of release of a hazardous substance that may pose a risk to human health or the environment. Cleanup activities may include source term

415

Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter FY2009 Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2009 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2010 Environmental Compliance Performance Scorecard - Fourth Quarter FY2010

416

Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Fourth Quarter Fourth Quarter FY2011 Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Fourth Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - First Quarter FY2012

417

Environmental Compliance Performance Scorecard - First Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

First Quarter First Quarter FY2012 Environmental Compliance Performance Scorecard - First Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - First Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - Fourth Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012

418

EIS-0383: Draft Environmental Impact Statement | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Draft Environmental Impact Statement Draft Environmental Impact Statement EIS-0383: Draft Environmental Impact Statement Orlando Gasification Project This EIS assesses the potential environmental impacts that would result from a proposed DOE action to provide cost-shared funding for construction and operation of facilities at Orlando Utilities Commission's (OUC's) existing Stanton Energy Center near Orlando, Florida. The project has been selected for further consideration by DOE under the Clean Coal Power Initiative (CCPI) to demonstrate advanced power generation systems using Integrated Gasification Combined Cycle (IGCC) technology. Although DOE funding would support only the Orlando Gasification Project (i.e., coal gasifier, synthesis gas cleanup systems, and supporting infrastructure),

419

Environmental Compliance Performance Scorecard - Second Quarter FY2012 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2012 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2012 More Documents & Publications Environmental Compliance Performance Scorecard - First Quarter FY2012 Environmental Compliance Performance Scorecard - Fourth Quarter FY2012

420

Environmental Systems Research Candidates FY-01 Annual Report  

Science Conference Proceedings (OSTI)

The Environmental Systems Research Candidates (ESRC) Program ran from April 2000 through September 2001 as part of the Environmental Systems Research and Analysis (ESRA) Program at the Idaho National Engineering and Environmental Laboratory (INEEL). ESRA provides key science and technology to meet the cleanup mission of the U.S. Department of Energy Office of Environmental Management (EM), and performs research and development that will help solve current legacy problems and enhance the INEELs scientific and technical capability for solving longer-term challenges. This report documents the accomplishments of the ESRC Program. The ESRC Program consisted of 25 tasks subdivided within four research areas.

Miller, David Lynn; Piet, Steven James

2001-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Environmental Compliance Performance Scorecard - Second Quarter FY2011 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Second Quarter Second Quarter FY2011 Environmental Compliance Performance Scorecard - Second Quarter FY2011 The information in the scorecard represents preliminary data and is provided for the public interest. While EM makes every effort to ensure the scorecard's timeliness and completeness, the dynamic nature of cleanup actions and modifications to agreements are such that the scorecard may not be completely accurate. Consequently, this scorecard is not used as a notification to regulatory agencies of attained or missed milestones. Environmental Compliance Performance Scorecard - Second Quarter FY2011 More Documents & Publications Environmental Compliance Performance Scorecard - Second Quarter FY2012 Environmental Compliance Performance Scorecard - Second Quarter FY2010

422

Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

October 6, 2011 October 6, 2011 Idaho Site Completes Cleanup with Help from Workers who Shipped Waste Decades Ago IDAHO FALLS, Idaho - From the 1950s until the 1980s, workers at the former Rocky Flats Plant near Denver, Colo., sent hundreds of thousands of barrels and boxes of radioactive and hazardous waste to the Idaho National Laboratory (INL) for disposal both above and below ground. Now, some of those who sent the Cold War weapons waste to Idaho are helping identify the waste in pits dug up for the first time in more than 40 years. Pit 9 is the most recently completed buried waste exhumation project at INL's Radioactive Waste Management Complex. About $12 million in savings from the Idaho site's American Recovery and Reinvestment Act cleanup contributed to the project, which was

423

Workers at Hanford Site Achieve Recovery Act Legacy Cleanup Goals Ahead of Schedule  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

July 27, 2011 July 27, 2011 Workers at Hanford Site Achieve Recovery Act Legacy Cleanup Goals Ahead of Schedule RICHLAND, Wash. - The Hanford Site re- cently surpassed American Recovery and Reinvestment Act goals to accelerate the cleanup of legacy waste and fuels. Workers recently achieved three waste management goals ahead of a Sept. 30, 2011 target. The three goals focus on re- ducing Hanford's onsite waste inventory as part of the work funded by $1.6 billion the Richland Operations Office received from the Recovery Act. The three goals are: * Retrieve 50 cubic meters of Remote-Handled (RH) Transuranic (TRU) waste. Workers have re- trieved 84 cubic meters of the waste to date. Compared to contact-handled TRU waste, RH TRU waste requires additional radiation dose

424

ORNL research reveals new challenges for mercury cleanup | ornl.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Jennifer Brouner Jennifer Brouner Communications 865.241.0709 ORNL research reveals new challenges for mercury cleanup ORNL researchers are learning more about the microbial processes that convert elemental mercury into methylmercury. ORNL researchers are learning more about the microbial processes that convert elemental mercury into methylmercury. (hi-res image) OAK RIDGE, Tenn., Aug. 5, 2013 - More forms of mercury can be converted to deadly methylmercury than previously thought, according to a study published Sunday in Nature Geoscience. The discovery provides scientists with another piece of the mercury puzzle, bringing them one step closer to understanding the challenges associated with mercury cleanup. Earlier this year, a multidisciplinary team of researchers at Oak Ridge

425

User:GregZiebold/U.S. National Lab cleanup | Open Energy Information  

Open Energy Info (EERE)

National Lab cleanup National Lab cleanup < User:GregZiebold Jump to: navigation, search Energy Initiatives ANL Wind Power Forecasting and Electricity Markets Afghanistan-NREL Mission Afghanistan-NREL Resource Maps and Toolkits Algeria-NREL Energy Activities Argentina-NREL Bi-National Energy Working Group Assessment of Biomass Resources from Marginal Lands in APEC Countries Assisting Mexico in Developing Energy Supply and Demand Projections Berkeley India Joint Leadership on Energy and Environment Brazil-NETL Advanced Fossil Fuels Partnerships Brazil-NREL Biofuels and EERE Cooperation Canada-NREL Energy Activities Caribbean-NREL Cooperation Center for BioEnergy Sustainability Chile-NREL Renewable Energy Center and CSP Activities Chile-NREL Rural Electrification Activities China and India Industrial Efficiency NREL Partnership

426

The Department of Energy Announces Major Cold War Legacy Waste Cleanup  

NLE Websites -- All DOE Office Websites (Extended Search)

Media Contact: (208) 586-4940 For Immediate Release: September 28, 2011 The Department of Energy Announces Major Cold War Legacy Waste Cleanup Milestone Waste Isolation Pilot Plant Receives 10,000th Shipment CARLSBAD, NM - The U.S. Department of Energy today announced that the Waste Isolation Pilot Plant (WIPP) received its 10,000th shipment of transuranic (TRU) waste over the weekend. This marks an important milestone in DOE�s mission to clean up the country�s Cold War legacy. "This accomplishment reflects the hard work and dedication of our workers and contractors," said Energy Secretary Steven Chu. "It also demonstrates the Department�s commitment to future generations as we continue our cleanup mission as safely and quickly as possible."

427

Microsoft Word - DOE Exceeds TRU Waste Cleanup Goal at LANL.doc  

NLE Websites -- All DOE Office Websites (Extended Search)

DOE Exceeds 2012 TRU Waste Cleanup Goal at DOE Exceeds 2012 TRU Waste Cleanup Goal at Los Alamos National Laboratory CARLSBAD, N.M., October 3, 2012 -The Waste Isolation Pilot Plant (WIPP) Central Characterization Project (CCP) and Los Alamos National Laboratory (LANL) exceeded a fiscal year 2012 goal of characterizing and shipping 800 cubic meters of transuranic (TRU) waste, fulfilling a commitment to the state of New Mexico. The 800 cubic meters goal was exceeded by more than 100 cubic meters, with the vast majority of the TRU waste characterized as defense related TRU and permanently disposed at WIPP. To accomplish this achievement, the WIPP CCP increased the amount of waste that was certified, ensuring it met all the requirements for disposal at WIPP. This resulted in the ability to

428

Survey of Optimization of Reactor Coolant Cleanup Systems: For Boiling Water Reactors and Pressurized Water Reactors  

Science Conference Proceedings (OSTI)

Optimization of the reactor coolant cleanup systems in the boiling water reactor (BWR) and pressurized water reactor (PWR) environment is important for controlling the transport of corrosion products (metals and activated metals), fission products, and coolant impurities (soluble and insoluble) throughout the reactor coolant loop, and this optimization contributes to reducing primary system radiation fields. The removal of radionuclides and corrosion products is just one of many functions (both ...

2013-09-27T23:59:59.000Z

429

Cleanup Verification Package for the 118-B-1, 105-B Solid Waste Burial Ground  

SciTech Connect

This cleanup verification package documents completion of remedial action, sampling activities, and compliance criteria for the 118-B-1, 105-B Solid Waste Burial Ground. This waste site was the primary burial ground for general wastes from the operation of the 105-B Reactor and P-10 Tritium Separation Project and also received waste from the 105-N Reactor. The burial ground received reactor hardware, process piping and tubing, fuel spacers, glassware, electrical components, tritium process wastes, soft wastes and other miscellaneous debris.

J. M. Capron

2008-01-21T23:59:59.000Z

430

Landfill gas cleanup for carbonate fuel cell power generation. Final report  

DOE Green Energy (OSTI)

To utilize landfill gas for power generation using carbonate fuel cells, the LFG must be cleaned up to remove sulfur and chlorine compounds. This not only benefits the operation of the fuel cell, but also benefits the environment by preventing the emission of these contaminants to the atmosphere. Commercial technologies for gas processing are generally economical in relatively large sizes (3 MMSCFD or larger), and may not achieve the low levels of contaminants required. To address the issue of LFG clean-up for fuel cell application, a process was developed utilizing commercially available technology. A pilot-scale test facility utilizing this process was built at a landfill site in Anoka, Minnesota using the EPRI fuel cell test facility used for coal gas testing. The pilot plant was tested for 1000 hours, processing 970,000 SCF (27,500 Nm{sup 3}) of landfill gas. Testing indicated that the process could achieve the following concentrations of contaminants in the clean gas: Less than 80 ppbv hydrogen sulfide; less than 1 ppm (the detection limit) organic sulfur; less than 300 ppbv hydrogen chloride; less than 20--80 ppbv if any individual chlorinated hydrocarbon; and 1.5 ppm (average) Sulfur Dioxide. The paper describes the LFG composition for bulk and trace compounds; evaluation of various methods to clean landfill gas; design of a LFG cleanup system; field test of pilot-scale gas cleanup process; fuel cell testing on simulated landfill gas; single cell testing on landfill gas contaminants and post test analysis; and design and economic analyses of a full scale gas cleanup system.

Steinfeld, G.; Sanderson, R.

1998-02-01T23:59:59.000Z

431

Impacts of Motor Vehicle Operation on Water Quality in the United States - Clean-up Costs and Policies  

E-Print Network (OSTI)

oil and oil filter reimbursement checks, so check processing costsCosts of remediating underground storage tank leaks exceed benefits. Oil andOil Companies Pay US EPA to Settle Santa Monica MTBE Cleanup Costs,

Nixon, Hilary; Saphores, Jean-Daniel

2007-01-01T23:59:59.000Z

432

The Development of Warm Gas Cleanup Technologies for the Removal of Sulfur Containing Species from Steam Hydrogasification  

E-Print Network (OSTI)

Gupta, B. Turk, M. Lesemann. RTI/Eastman warm syngas clean-feasibility analysis of RTI warm gas cleanup(WGCU)reactor was constructed by RTI from DOE-Morgantown gasifier,

Luo, Qian

2012-01-01T23:59:59.000Z

433

The Development of Warm Gas Cleanup Technologies for the Removal of Sulfur Containing Species from Steam Hydrogasification  

E-Print Network (OSTI)

for biomas-derived syngas. National Renewable EnergyM. Lesemann. RTI/Eastman warm syngas clean-up technology:v the composition of syngas from steam hydrogasification

Luo, Qian

2012-01-01T23:59:59.000Z

434

Determination of the effect of formation water on fracture-fluid cleanup  

SciTech Connect

Understanding hydraulic-fracture cleanup is essential for improving well stimulation. Residual gel damages fracture conductivity, shortens effective fracture half-length, and limits well productivity. The drive to develop fluids, additives, and procedures that minimize this damage continues to be a dominant theme in fracture-fluid-development programs. Fracture cleanup is a complex problem, and many parameters (e.g., fluid system, job design, flowback procedure, and reservoir conditions) can influence polymer and fluid recovery efficiencies. Often, specific products and methods that work well in one reservoir have little effect in another. Systematic analysis of fluid and polymer returns after a treatment is completed is the only way to quantify fracture cleanup. This is referred to as flowback analysis. This paper discusses a flowback-analysis field study on large hydraulic-fracturing treatments in the Taylor zone of the Cotton Valley formation in east Texas. This is a low-permeability (approximately 0.01 md) tight gas formation. It is a heterogeneous zone with layers of productive sandstone interspersed with relatively impermeable layers of shale. A typical well in this field initially produces approximately 0.75 to 1.3 MMcf/D gas and 35 to 40 bbl of water/MMcf of gas. The returns from 10 wells in this field were analyzed thoroughly.

NONE

1998-03-01T23:59:59.000Z

435

OVERVIEW OF IMPACTS OF TECHNOLOGY DEPLOYMENT ON THE MISSION OF THE DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT  

Science Conference Proceedings (OSTI)

The Environmental Management (EM) mission is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. The EM program has embraced a mission completion philosophy based on reducing risk and environmental liability over a 40-50 year lifecycle. The Department has made great progress toward safely disposing of its legacy nuclear waste. EM Research and Development (R&D) program management strategies have driven numerous technology and engineering innovations to reduce risk, minimize cleanup costs, and reduce schedules. Engineering and technology investments have provided the engineering foundation, technical assistance, approaches, and technologies that have contributed to moving the cleanup effort forward. These successes include start-up and operation of several waste treatment facilities and processes at the sites.

McCabe, D.; Chamberlain, G.; Looney, B.; Gladden, J.

2010-11-30T23:59:59.000Z

436

Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 2: Gas Cleanup Design and Cost Estimates -- Black Liquor Gasification  

DOE Green Energy (OSTI)

As part of Task 2, Gas Cleanup and Cost Estimates, Nexant investigated the appropriate process scheme for removal of acid gases from black liquor-derived syngas for use in both power and liquid fuels synthesis. Two 3,200 metric tonne per day gasification schemes, both low-temperature/low-pressure (1100 deg F, 40 psi) and high-temperature/high-pressure (1800 deg F, 500 psi) were used for syngas production. Initial syngas conditions from each of the gasifiers was provided to the team by the National Renewable Energy Laboratory and Princeton University. Nexant was the prime contractor and principal investigator during this task; technical assistance was provided by both GTI and Emery Energy.

Nexant Inc.

2006-05-01T23:59:59.000Z

437

Environmental Biosciences Quarterly Report  

SciTech Connect

In May 2002, the United States Department of Energy (DOE) signed Assistance Instrument Number DE-FC09-02CH11109 with the Medical University of South Carolina (MUSC) to support the Environmental Biosciences Program (EBP). This funding instrument replaces DOE Assistance Instrument Number DE-FC02-98CH10902. EBP is an integrated, multidisciplinary scientific research program, employing a range of research initiatives to identify, study and resolve environmental health risks. These initiatives are consistent with the MUSC role as a comprehensive state-supported health sciences institution and with the nation's need for new and better approaches to the solution of a complex and expansive array of environment-related health problems. The intrinsic capabilities of a comprehensive health sciences institution enable MUSC to be a national resource for the scientific investigation of environmental health issues. EBPs success as a nationally prominent research program is due, in part, to its ability to task-organize scientific expertise from multiple disciplines in addressing these complex problems. Current research projects have focused EBP talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene and low-dose ionizing radiation. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the DOE. Plans for restructuring the performance schedule of the trichloroethylene projects have been submitted to the department. A project is also being conducted in the use of geographical information system technology to analyze population health risks related to environmental hazards as a tool for risk-based decision-making. Questions, comments or requests for further information concerning the activities under this cooperative agreement can be forwarded to Dr. Lawrence C. Mohr in the EBP office of the Medical University of South Carolina at (843) 792-1532.

Lawrence C. Mohr, M.D.

2007-01-31T23:59:59.000Z

438

Environmental data management at Fernald  

SciTech Connect

FERMCO supports DOE`s ongoing initiatives for the continuous improvement of site restoration through the development and application of innovative technologies. A major thrust of FERMCO`s efforts has been the enhancement of environmental data management technology for the site. The understanding of environmental data is the fundamental basis for determining the need for environmental restoration, developing and comparing remedial alternatives, and reaching a decision on how to clean up a site. Environmental data management at Fernald is being focused on two major objectives: to improve the efficiency of the data management process, and to provide a better understanding of the meaning of the data at the earliest possible time. Environmental data at Fernald is typically a soil or groundwater sample collected by one of the field geologists. These samples are then shipped to one or more laboratories for analysis. After the analyses are returned from the laboratories the data are reviewed and qualified for usability. The data are then used by environmental professionals for determining nature and extent of contamination. Additionally, hazardous waste materials whether generated during production or during cleanup, may be sampled to characterize the waste before shipment or treatment. The data management process, which uses four major software systems, is presented graphically.

Jones, B.W.; Williams, J.

1994-04-22T23:59:59.000Z

439

BNL Environmental Restoration Directorate  

NLE Websites -- All DOE Office Websites (Extended Search)

Several cleanup activities were taking place during the summer of 2003. Meadow Marsh Ash Pit Former Hazardous Waste Management Facility A fact sheet is now available giving...

440

2004 Environmental Site Report  

NLE Websites -- All DOE Office Websites (Extended Search)

phenolic compounds. Tests of underground coal gasification and tests of in-situ oil shale retorting resulted in contamination at these sites. The largest cleanup activity...

Note: This page contains sample records for the topic "non-defense environmental cleanup" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Hot Gas Cleanup Test Facility for gasification and pressurized combustion. Quarterly report, October--December 1994  

Science Conference Proceedings (OSTI)

The objective of this project is to evaluate hot gas particle control technologies using coal-derived gas streams. This will entail the design, construction, installation, and use of a flexible test facility which can operate under realistic gasification and combustion conditions. The major particulate control device issues to be addressed include the integration of the particulate control devices into coal utilization systems, on-line cleaning techniques, chemical and thermal degradation of components, fatigue or structural failures, blinding, collection efficiency as a function of particle size, and scale-up of particulate control systems to commercial size. The conceptual design of the facility was extended to include a within scope, phased expansion of the existing Hot Gas Cleanup Test Facility Cooperative Agreement to also address systems integration issues of hot particulate removal in advanced coal-based power generation systems. This expansion included the consideration of the following modules at the test facility in addition to the original Transport Reactor gas source and Hot Gas Cleanup Units: carbonizer/pressurized circulating fluidized bed gas source; hot gas cleanup units to mate to all gas streams; combustion gas turbine; and fuel cell and associated gas treatment. The major emphasis during this reporting period was continuing the detailed design of the facility and integrating the particulate control devices (PCDs) into structural and process designs. Substantial progress in underground construction activities was achieved during the quarter. Delivery and construction of coal handling and process structural steel began during the quarter. Delivery and construction of coal handling and process structural steel began during the quarter. MWK equipment at the grade level and the first tier are being set in the structure.

NONE

1995-02-01T23:59:59.000Z

442

Applicable or relevant and appropriate requirements (ARARs) for remedial actions at the Paducah Gaseous Diffusion Plant: A compendium of environmental laws and guidance. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances found at sites placed on the National Priorities List (NPL) by the US Environmental Protection Agency (EPA) must comply with applicable or relevant and appropriate requirements (ARARs) or standards under federal and state environmental laws. To date, the US Department of Energy (DOE) Paducah Gaseous Diffusion Plant (PGDP) has not been on the NPL. Although DOE and EPA have entered into an Administrative Consent Order (ACO), the prime regulatory authority for cleanup at PGDP will be the Resource Conservation and Recovery Act (RCRA). This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at PGDP in the event that the plant becomes included on the NPL or the ACO is modified to include CERCLA cleanup. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Kentucky are listed in tables. In addition, the major provisions of RCRA, the Safe Drinking Water Act, the Clean Water Act, the Clean Air Act, and other acts, as they apply to hazardous and radioactive waste cleanup, are discussed.

Etnier, E.L.; Eaton, L.A. [Oak Ridge National Lab., TN (United States)

1992-03-01T23:59:59.000Z

443

Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project  

SciTech Connect

This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

A. B. Culp

2007-01-26T23:59:59.000Z

444

Superfund at work: Hazardous waste cleanup efforts nationwide, fall 1992. (American Thermostat Corporation, New York)  

SciTech Connect

EPA's Superfund program decisively mitigated dangerously high levels of toxic chemicals at New York's American Thermostat Corporation (ATC) hazardous waste site. Superfund staff: quickly sampled area drinking wells and treated over 10 million gallons of contaminated ground water; used innovative technologies to reduce on-site soil and ground water contamination; secured a permanent alternate water supply for affected residents; and initiated a public outreach effort which gained support for cleanup activities. The American Thermostat site is a prime example of EPA's commitment to preserve the health and welfare of citizens and the environment.

Not Available

1992-01-01T23:59:59.000Z

445

Environmental Management System  

NLE Websites -- All DOE Office Websites (Extended Search)

Video Community, Environment Environmental Stewardship Environmental Protection Environmental Management System Environmental Management System An Environmental...

446

Environmental Restoration Quality Program Plan. Environmental Restoration Program  

Science Conference Proceedings (OSTI)

The Martin Marietta Energy Systems, Inc., Environmental Restoration (ER) Program was initially chartered on October 1, 1989, as a ``entral Environmental Restoration Division`` to manage the investigation and remediation of inactive sites and facilities that have been declared surplus and have no further programmatic use. The Energy Systems ER Division was established to support the DOE Oak Ridge Field Office (DOE-OR) consolidated ER Program. The DOE-OR Assistant Manager for Environmental Restoration and Waste Management provides program and budget direction to the Energy Systems ER Program for environmental restoration activities at the sites operated by Energy Systems (Oak Ridge K-25 Site, Oak Ridge National Laboratory, Oak Ridge Y-12 Plant, Paducah Gaseous Diffusion Plant, Portsmouth Gaseous Diffusion Plant) and at the off-site locations. The Energy Systems ER Division is specifically charged with assessing these sites for potential contamination and managing the cleanup processes. The Energy Systems Environmental Restoration Division was chartered on October 1, 1989, as a central organization to manage the Remedial Action (RA) Program. The purpose of this document is to ensure that: senior ER management provides planning, organization, direction, control, and support to achieve the organization`s objectives; the line organization achieves quality; and overall performance is reviewed and evaluated using a rigorous assessment process.

Colley, J.S.

1992-08-01T23:59:59.000Z

447

Department of Energy Office of Environmental Management: Historically Black  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Department of Energy Office of Environmental Management: Department of Energy Office of Environmental Management: Historically Black Colleges and Universities July 2009 Department of Energy Office of Environmental Management: Historically Black Colleges and Universities July 2009 A presentation at the 10th Annual Small Business Conference and Expo, given by the Office of