National Library of Energy BETA

Sample records for nevada rail corridor

  1. EIS-0250: Notice of Preferred Nevada Rail Corridor

    Broader source: Energy.gov [DOE]

    Geologic Repository for the Disposal of Spent Nuclear Fuel and High-level Radioactive Waste at Yucca Mountain, Nye County, Nevada

  2. EIS-0250-S2: Supplemental EIS for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada- Nevada Rail Transportation Corridor

    Broader source: Energy.gov [DOE]

    This SEIS is to evaluate the potential environmental impacts of constructing and operating a railroad for shipments of spent nuclear fuel and high-level radioactive waste from an existing rail line in Nevada to a geologic repository at Yucca Mountain. The purpose of the evaluation is to assist the Department in deciding whether to construct and operate a railroad in Nevada, and if so, in which corridor and along which specific alignment within the selected corridor.

  3. ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED WITHDRAWAL OF PUBLIC LANDS WITHIN AND SURROUNDING THE CALIENTE RAIL CORRIDOR, NEVADA

    SciTech Connect (OSTI)

    DOE

    2005-12-01

    The purpose for agency action is to preclude surface entry and the location of new mining claims, subject to valid existing rights, within and surrounding the Caliente rail corridor as described in the Yucca Mountain FEIS (DOE 2002). This protective measure is needed to enhance the safe, efficient, and uninterrupted evaluation of land areas for potential rail alignments within the Caliente rail corridor. The evaluation will assist the DOE in determining, through the Rail Alignment environmental impact statement (EIS) process, whether to construct a branch rail line, and to provide support to the BLM in deciding whether or not to reserve a ROW for the rail line under the Federal Land Policy and Management Act (FLPMA). The BLM participated as a cooperating agency in preparing this EA because it is the responsible land manager and BLM staff could contribute resource specific expertise.

  4. PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES

    Broader source: Energy.gov [DOE]

    Designed to promote energy efficiency in buildings in Phoenix, Arizona’s 10-mile-long Light Rail Corridor, Energize Phoenix focused on performing energy upgrades and reducing energy use in...

  5. PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES | Department...

    Energy Savers [EERE]

    in Phoenix, Arizona's 10-mile-long Light Rail Corridor, Energize Phoenix focused on performing energy upgrades and reducing energy use in commercial and residential spaces. ...

  6. Transportation of Spent Nuclear Fuel and High Level Waste to Yucca Mountain: The Next Step in Nevada

    SciTech Connect (OSTI)

    Sweeney, Robin L,; Lechel, David J.

    2003-02-25

    In the U.S. Department of Energy's ''Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada,'' the Department states that certain broad transportation-related decisions can be made. These include the choice of a mode of transportation nationally (mostly legal-weight truck or mostly rail) and in Nevada (mostly rail, mostly legal-weight truck, or mostly heavy-haul truck with use of an associated intermodal transfer station), as well as the choice among alternative rail corridors or heavy-haul truck routes with use of an associated intermodal transfer station in Nevada. Although a rail line does not service the Yucca Mountain site, the Department has identified mostly rail as its preferred mode of transportation, both nationally and in the State of Nevada. If mostly rail is selected for Nevada, the Department would then identify a preference for one of the rail corridors in consultation with affected stakeholders, particularly the State of Nevada. DOE would then select the rail corridor and initiate a process to select a specific rail alignment within the corridor for the construction of a rail line. Five proposed rail corridors were analyzed in the Final Environmental Impact Statement. The assessment considered the impacts of constructing a branch rail line in the five 400-meter (0.25mile) wide corridors. Each corridor connects the Yucca Mountain site with an existing mainline railroad in Nevada.

  7. Rail versus truck fuel efficiency: The relative fuel efficiency of truck-competitive rail freight and truck operations compared in a range of corridors. Final report

    SciTech Connect (OSTI)

    Not Available

    1991-04-01

    The report summarizes the findings of a study to evaluate the fuel efficiency of rail freight operations relative to competing truckload service. The objective of the study was to identify the circumstances in which rail freight service offers a fuel efficiency advantage over alternative truckload options, and to estimate the fuel savings associated with using rail service. The findings are based on computer simulations of rail and truck freight movements between the same origins and destinations. The simulation input assumptions and data are based on actual rail and truck operations. Input data was provided by U.S. regional and Class I railroads and by large truck fleet operators.

  8. The Rail Alignment Environmental Impact Statement: An Update

    SciTech Connect (OSTI)

    R. Sweeney

    2005-01-20

    On July 23,2002, the President of the United States signed into law a joint resolution of the United States Congress designating the Yucca Mountain site in Nye County, Nevada, for development as a geologic repository for the disposal of spent nuclear fuel and high-level radioactive waste. If the US. Nuclear Regulatory Commission authorizes construction of the repository and receipt and possession of spent nuclear fuel and high-level radioactive at Yucca Mountain, the U.S. Department of Energy (DOE) would be responsible for transporting these materials to the Yucca Mountain repository as part of its obligation under the Nuclear Waste Policy Act. Part of the site recommendation decision included the analysis of a nation-wide shipping campaign to the proposed repository site. The ''Final Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada'' (February 2002) (Repository EIS) evaluated the potential impacts of the transportation of 70,000 Metric Tons of Heavy Metal spent nuclear fuel and high-level radioactive waste from 77 locations around the nation to the potential repository in Nevada over a 24 year shipping campaign. In the Repository EIS, DOE identified mostly rail as its preferred mode of transportation, both nationally and in the State of Nevada. In December 2003, based on public comments and the environmental analyses in the Repository EIS, DOE identified a preference for the Caliente rail corridor in Nevada. On April 8, 2004, DOE issued a Record of Decision (ROD) on the Mode of Transportation and Nevada Rail Corridor for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada. In this ROD, the DOE announced that it had decided to select the mostly rail scenario analyzed in the Repository EIS as the transportation mode both on a national basis and in the State of Nevada. Under the mostly rail

  9. EIS-0490: Boulder City/U.S. 93 Corridor Transportation Improvements, Boulder City, Nevada

    Broader source: Energy.gov [DOE]

    The Federal Highway Administration and the Nevada Department of Transportation prepared an EIS to evaluate the potential environmental impacts of the proposed Boulder City/U.S. 93 Bypass Project in...

  10. Isotopic evidence of source variations in commingled magma systems: Colorado River extensional corridor, Arizona and Nevada

    SciTech Connect (OSTI)

    Metcalf, R.V.; Smith, E.I.; Martin, M.W. . Dept. of Geoscience); Gonzales, D.A.; Walker, J.D. . Isotope Geochronology Lab.)

    1993-04-01

    Mixing of mantle derived mafic and crustal derived felsic magmas is a major Province-wide process forming Tertiary intermediate magmas within the Basin and Range. Major variations in magma sources, however, may exist in temporally and spatially related systems. Such variations are exemplified by two closely spaced plutons within the northern Colorado River extensional corridor. The 15.96 Ma Mt. Perkins pluton (MPP) was emplaced in three major phases: phase 1 (oldest) gabbro; phase 2 quartz diorite to hornblende granodiorite; and phase 3 biotite granodiorite ([+-]hbld). Phases 2 and 3 contain mafic microgranitoid enclaves (MME) that exhibit evidence of magma mingling. Combined data from phase 2 and 3 rocks, including MMW, shows positive [sup 87]Sr/[sup 86]Sr and negative [var epsilon]Nd correlations vs. SiO[sub 2] (50--72 wt %). Phase 2 rocks, which plot between phase 2 MME and MME-free phase 3 granodiorite, represent hybrid magmas formed by mixing of mantle and crustal derived magmas. Phase 1 gabbro falls off isotope-SiO[sub 2] trends and represents a separate mantle derived magma. The 13.2 Ma Wilson Ridge pluton (WRP), <20 km north of MPP, is cogenetic with the river Mountains volcano (RMV). In WRP an early diorite was intruded by a suite of monzodiorite to quartz monzonite. The monzodiorite portion contains MME and mafic schlieren representing mingled and mixed mafic magmas. The WRP and MPP represent two closely spaced isotopically distinct and separate magma systems. There are five magma sources. The two felsic mixing end members represent two different crustal magma sources. Two mantle sources are presented by MPP phase 1 gabbro and phase 2 MME, reflecting lithospheric and asthenospheric components, respectively. The latter represents the oldest reported Tertiary asthenospheric component within the region. A single lithospheric mantle source, different from the MPP gabbro, is indicated for the mafic mixing end member in the WRP-RMV suite.

  11. Nevada

    National Nuclear Security Administration (NNSA)

    Nevada Nevada USGS National Seismic Hazard Maps Nevada http:earthquake.usgs.govearthquakesstatesnevadahazards.php 1 of 1 1292010 2:06 PM...

  12. Nevada

    National Nuclear Security Administration (NNSA)

    contractor at the Nevada National Security Site, has been recognized by the Department of Energy for excellence in occupational safety and health protection. National Nuclear...

  13. Chicago-St. Louis high speed rail plan

    SciTech Connect (OSTI)

    Stead, M.E.

    1994-12-31

    The Illinois Department of Transportation (IDOT), in cooperation with Amtrak, undertook the Chicago-St. Louis High Speed Rail Financial and Implementation Plan study in order to develop a realistic and achievable blueprint for implementation of high speed rail in the Chicago-St. Louis corridor. This report presents a summary of the Price Waterhouse Project Team`s analysis and the Financial and Implementation Plan for implementing high speed rail service in the Chicago-St. Louis corridor.

  14. Proposed Energy Transport Corridors: West-wide energy corridor...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Proposed Energy Transport Corridors: West-wide energy corridor ...

  15. Nevada potential repository preliminary transportation strategy Study 2. Volume 1

    SciTech Connect (OSTI)

    1996-02-01

    The objectives of this study were to build on the findings of the Nevada Potential Repository Preliminary Transportation Strategy Study 1 (CRWMS M&O 1995b), and to provide additional information for input to the repository environmental impact statement (EIS) process. In addition, this study supported the future selection of a preferred rail corridor and/or heavy haul route based on defensible data, methods, and analyses. Study research did not consider proposed legislation. Planning was conducted according to the Civilian Radioactive Waste Management Program Plan (DOE 1994a). The specific objectives of Study 2 were to: eliminate or reduce data gaps, inconsistencies, and uncertainties, and strengthen the analysis performed in Study 1; develop a preliminary list of rail route evaluation criteria that could be used to solicit input from stakeholders during scoping meetings. The evaluation criteria will be revised based on comments received during scoping; restrict and refine the width of the four rail corridors identified in Study 1 to five miles or less, based on land use constraints and engineering criteria identified and established in Study 2; evaluate national-level effects of routing spent nuclear fuel and high-level waste to the four identified branch lines, including the effects of routing through or avoiding Las Vegas; continue to gather published land use information and environmental data to support the repository EIS; continue to evaluate heavy haul truck transport over three existing routes as an alternative to rail and provide sufficient information to support the repository EIS process; and evaluate secondary uses for rail (passenger use, repository construction, shared use).

  16. Nevada - Compare - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Nevada Nevada

  17. Nevada - Rankings - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Nevada Nevada

  18. Nevada - Search - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) Indexed Site

    Nevada Nevada

  19. Proposed Energy Transport Corridors: West-wide energy corridor programmatic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    EIS, Draft Corridors - September 2007. | Department of Energy Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Proposed Energy Transport Corridors: West-wide energy corridor programmatic EIS, Draft Corridors - September 2007. Map of the area covered by a programmatic environmental impact statement (PEIS), "Designation of Energy Corridors on Federal Land in the 11 Western States" (DOE/EIS-0386) to address the

  20. River Corridor - Hanford Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    River Corridor Richland Operations Office Richland Operations Office River Corridor B Reactor 300 Area 324 Building 618-10 and 618-11 Burial Grounds C Reactor D and DR Reactors F ...

  1. River Corridor Achievements

    Broader source: Energy.gov [DOE]

    Washington Closure Hanford and previous contractors have completed much of the cleanup work in the River Corridor, shown here.

  2. Site mitigation issues along the Alameda Corridor

    SciTech Connect (OSTI)

    Ripaldi, C.P.

    1996-12-31

    The Alameda Corridor is a consolidated railroad link between the Ports of Los Angeles and Long Beach and the regional and national rail systems linking the nation. A joint Environmental Impacts Report/Environmental Impact Statement (EIR/EIS) was prepared for the project. The Final EIS was issued in February 1996, and a record of decision was issued in May, 1996. Various Phase 1 and Phase 2 Environmental Site Assessments have provided extensive historical documentation of environmental contamination in the vicinity of the Alameda Corridor Transportation Project. A Site Mitigation Master Plan provides guidance and direction for the clean-up activities. Samples will be analyzed for metals, PCB`s TRPH, BTEX, and VOCs.

  3. I-5 Corridor Reinforcement

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Damper Replacement Program Wind Projects I-5 Corridor Reinforcement Current project schedule and activities BPA now expects to release our final EIS early in 2016, followed...

  4. Strategy for the Integration of Hydrogen as a Vehicle Fuel into the Existing Natural Gas Vehicle Fueling Infrastructure of the Interstate Clean Transportation Corridor Project: 22 April 2004--31 August 2005

    SciTech Connect (OSTI)

    Gladstein, Neandross and Associates

    2005-09-01

    Evaluates opportunities to integrate hydrogen into the fueling stations of the Interstate Clean Transportation Corridor--an existing network of LNG fueling stations in California and Nevada.

  5. Nevada`s role in the hydrogen economy

    SciTech Connect (OSTI)

    Vaeth, T.

    1997-12-31

    The paper discusses the promise of hydrogen and its possible applications, barriers to its development, the role that the Nevada Test Site could play if it were made more available to public and private institutions for research, and the ``clean city`` concept being developed jointly with California, Utah, and Nevada. This concept would create a ``clean corridor`` along the route from Salt Lake City through Reno to Sacramento, Los Angeles, Las Vegas, and back to Salt Lake City.

  6. Western Energy Corridor -- Energy Resource Report

    SciTech Connect (OSTI)

    Leslie Roberts; Michael Hagood

    2011-06-01

    The world is facing significant growth in energy demand over the next several decades. Strategic in meeting this demand are the world-class energy resources concentrated along the Rocky Mountains and northern plains in Canada and the U.S., informally referred to as the Western Energy Corridor (WEC). The fossil energy resources in this region are rivaled only in a very few places in the world, and the proven uranium reserves are among the world's largest. Also concentrated in this region are renewable resources contributing to wind power, hydro power, bioenergy, geothermal energy, and solar energy. Substantial existing and planned energy infrastructure, including refineries, pipelines, electrical transmission lines, and rail lines provide access to these resources.

  7. Radial arm strike rail

    DOE Patents [OSTI]

    McKeown, Mark H.; Beason, Steven C.

    1991-01-01

    The radial arm strike rail assembly is a system for measurement of bearings, directions, and stereophotography for geologic mapping, particularly where magnetic compasses are not appropriate. The radial arm, pivoting around a shaft axis, provides a reference direction determination for geologic mapping and bearing or direction determination. The centerable and levelable pedestal provide a base for the radial arm strike rail and the telescoping camera pedestal. The telescoping feature of the radial arm strike rail allows positioning the end of the rail for strike direction or bearing measurement with a goniometer.

  8. Southwest Area Corridor Map | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Interest Electric Transmission Corridors October 2, 2007 FACT SHEET: Designation of National Interest Electric Transmission Corridors,As Authorized by the Energy Policy Act of 2005

  9. Energy Corridors on Federal Lands

    Office of Energy Efficiency and Renewable Energy (EERE)

    To improve energy delivery and enhance the electric transmission grid for the future, several government agencies currently are working together to establish a coordinated network of Federal energy corridors on Federal lands throughout the United States.

  10. The Nevada railroad system: Physical, operational, and accident characteristics

    SciTech Connect (OSTI)

    1991-09-01

    This report provides a description of the operational and physical characteristics of the Nevada railroad system. To understand the dynamics of the rail system, one must consider the system`s physical characteristics, routing, uses, interactions with other systems, and unique operational characteristics, if any. This report is presented in two parts. The first part is a narrative description of all mainlines and major branchlines of the Nevada railroad system. Each Nevada rail route is described, including the route`s physical characteristics, traffic type and volume, track conditions, and history. The second part of this study provides a more detailed analysis of Nevada railroad accident characteristics than was presented in the Preliminary Nevada Transportation Accident Characterization Study (DOE, 1990).

  11. EIS-0250: Record of Decision

    Broader source: Energy.gov [DOE]

    Mode of Transportation and Nevada Rail Corridor for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, NV

  12. EA-1545: DOE Notice of Availability of the Environmental Assessment

    Broader source: Energy.gov [DOE]

    Department of Energy's Application to the DOI for a Public Land Order To Withdraw Public Lands Within and Around the Caliente Rail Corridor, Nevada

  13. All aboard for high-speed rail

    SciTech Connect (OSTI)

    Herman, D.

    1996-09-01

    A sleek, bullet-nosed train whizzing across the countryside is a fairly common sight in many nations. Since the Train a Grande Vitesse (TGV)--the record-setting ``train with great speed``--was introduced in France in 1981, Germany, Japan, and other countries have joined the high-speed club. In addition, the Eurostar passenger train, which travels between Great Britain and France through the Channel Tunnel, can move at 186 miles per hour once it reaches French tracks. Despite the technology`s growth elsewhere, rapid rail travel has not been seen on US shores beyond a few test runs by various manufacturers. Before the end of the century, however, American train spotters will finally be able to see some very fast trains here too. In March, Washington, DC-based Amtrak announced the purchase of 18 American Flyer high-speed train sets for the Northeast Corridor, which stretches from Boston through new York to the nation`s capital. Furthermore, Florida will get its own system by 2004, and other states are now taking a look at the technology. The American Flyer--designed by Montreal-based Bombardier and TGV manufacturer GEC Alsthom Transport in Paris--should venture onto US rails by 1999. Traveling at up to 150 miles per hour, the American Flyer will cut the New York-Boston run from 4 1/2 hours to 3 hours and reduce New York-Washington trip time from 3 hours to less than 2 3/4. Amtrak hopes the new trains and better times will earn it a greater share of travelers from air shuttles and perhaps from Interstate 95. This article describes how technologies that tilt railcars and propel the world`s fastest trains will be merged into one train set for the American Flyer, Amtrak`s first trip along high-speed rails.

  14. HANFORD SITE RIVER CORRIDOR CLEANUP

    SciTech Connect (OSTI)

    BAZZELL, K.D.

    2006-02-01

    In 2005, the US Department of Energy (DOE) launched the third generation of closure contracts, including the River Corridor Closure (RCC) Contract at Hanford. Over the past decade, significant progress has been made on cleaning up the river shore that bordes Hanford. However, the most important cleanup challenges lie ahead. In March 2005, DOE awarded the Hanford River Corridor Closure Contract to Washington Closure Hanford (WCH), a limited liability company owned by Washington Group International, Bechtel National and CH2M HILL. It is a single-purpose company whose goal is to safely and efficiently accelerate cleanup in the 544 km{sup 2} Hanford river corridor and reduce or eliminate future obligations to DOE for maintaining long-term stewardship over the site. The RCC Contract is a cost-plus-incentive-fee closure contract, which incentivizes the contractor to reduce cost and accelerate the schedule. At $1.9 billion and seven years, WCH has accelerated cleaning up Hanford's river corridor significantly compared to the $3.2 billion and 10 years originally estimated by the US Army Corps of Engineers. Predictable funding is one of the key features of the new contract, with funding set by contract at $183 million in fiscal year (FY) 2006 and peaking at $387 million in FY2012. Another feature of the contract allows for Washington Closure to perform up to 40% of the value of the contract and subcontract the balance. One of the major challenges in the next few years will be to identify and qualify sufficient subcontractors to meet the goal.

  15. Alternative Fuels Data Center: West Virginia CNG Corridor Now Open

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    West Virginia CNG Corridor Now Open to someone by E-mail Share Alternative Fuels Data Center: West Virginia CNG Corridor Now Open on Facebook Tweet about Alternative Fuels Data Center: West Virginia CNG Corridor Now Open on Twitter Bookmark Alternative Fuels Data Center: West Virginia CNG Corridor Now Open on Google Bookmark Alternative Fuels Data Center: West Virginia CNG Corridor Now Open on Delicious Rank Alternative Fuels Data Center: West Virginia CNG Corridor Now Open on Digg Find More

  16. Final Supplemental Environmental Impact Statement for a Geologic...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOEEIS-0250F-S2 and Final En Final Supplemental ...

  17. crd title p1.ai | Department of Energy

    Broader source: Energy.gov (indexed) [DOE]

    Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation CorridorDOEEIS-0250F-S2andFinal Envir EIS-0250-S2 and ...

  18. EIS-0250-S1 and EIS-0250-S2: DOE Notice of Availability of the...

    Broader source: Energy.gov (indexed) [DOE]

    NV and Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada--Nevada Rail Transportation Corridor The...

  19. crd title p1.ai | Department of Energy

    Energy Savers [EERE]

    for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOEEIS-0250F-S2 and ...

  20. Milford Wind Corridor Phase I (GE Energy) | Open Energy Information

    Open Energy Info (EERE)

    I (GE Energy) Jump to: navigation, search Name Milford Wind Corridor Phase I (GE Energy) Facility Milford Wind Corridor Phase I (GE Energy) Sector Wind energy Facility Type...

  1. Milford Wind Corridor Phase II | Open Energy Information

    Open Energy Info (EERE)

    II Jump to: navigation, search Name Milford Wind Corridor Phase II Facility Milford Wind Corridor Phase II Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  2. Milford Wind Corridor Phase I (Clipper) Wind Farm | Open Energy...

    Open Energy Info (EERE)

    Clipper) Wind Farm Jump to: navigation, search Name Milford Wind Corridor Phase I (Clipper) Wind Farm Facility Milford Wind Corridor Phase I (Clipper) Sector Wind energy Facility...

  3. Department of Energy Awards Hanford River Corridor Contract To...

    Energy Savers [EERE]

    Hanford River Corridor Contract To Washington Closure, LLC Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC March 23, 2005 - 10:56am Addthis ...

  4. Long Island Smart Energy Corridor

    SciTech Connect (OSTI)

    Mui, Ming

    2015-02-04

    The Long Island Power Authority (LIPA) has teamed with Stony Brook University (Stony Brook or SBU) and Farmingdale State College (Farmingdale or FSC), two branches of the State University of New York (SUNY), to create a “Smart Energy Corridor.” The project, located along the Route 110 business corridor on Long Island, New York, demonstrated the integration of a suite of Smart Grid technologies from substations to end-use loads. The Smart Energy Corridor Project included the following key features: -TECHNOLOGY: Demonstrated a full range of smart energy technologies, including substations and distribution feeder automation, fiber and radio communications backbone, advanced metering infrastructure (AM”), meter data management (MDM) system (which LIPA implemented outside of this project), field tools automation, customer-level energy management including automated energy management systems, and integration with distributed generation and plug-in hybrid electric vehicles. -MARKETING: A rigorous market test that identified customer response to an alternative time-of-use pricing plan and varying levels of information and analytical support. -CYBER SECURITY: Tested cyber security vulnerabilities in Smart Grid hardware, network, and application layers. Developed recommendations for policies, procedures, and technical controls to prevent or foil cyber-attacks and to harden the Smart Grid infrastructure. -RELIABILITY: Leveraged new Smart Grid-enabled data to increase system efficiency and reliability. Developed enhanced load forecasting, phase balancing, and voltage control techniques designed to work hand-in-hand with the Smart Grid technologies. -OUTREACH: Implemented public outreach and educational initiatives that were linked directly to the demonstration of Smart Grid technologies, tools, techniques, and system configurations. This included creation of full-scale operating models demonstrating application of Smart Grid technologies in business and residential

  5. Voluntary Protection Program Onsite Review, WSI-Nevada - Nevada...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    WSI-Nevada - Nevada National Security Site - February 2012 Voluntary Protection Program Onsite Review, WSI-Nevada - Nevada National Security Site - February 2012 February 2012 ...

  6. TEC Working Group Topic Groups Rail Key Documents | Department...

    Office of Environmental Management (EM)

    Rail Key Documents TEC Working Group Topic Groups Rail Key Documents KEY DOCUMENTS Radiation Monitoring Subgroup Intermodal Subgroup Planning Subgroup Current FRA State Rail Safety ...

  7. Shipping Radioactive Waste by Rail from Brookhaven National Laboratory...

    Office of Environmental Management (EM)

    Shipping Radioactive Waste by Rail from Brookhaven National Laboratory Shipping Radioactive Waste by Rail from Brookhaven National Laboratory Shipping Radioactive Waste by Rail ...

  8. Naval Spent Fuel Rail Shipment Accident Exercise Objectives ...

    Office of Environmental Management (EM)

    Naval Spent Fuel Rail Shipment Accident Exercise Objectives Naval Spent Fuel Rail Shipment Accident Exercise Objectives PDF icon Naval Spent Fuel Rail Shipment Accident Exercise ...

  9. MidAtlantic_Corridor_Map091707.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    MidAtlantic_Corridor_Map091707.pdf MidAtlantic_Corridor_Map091707.pdf (1.64 MB) More Documents & Publications DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors October 2, 2007 FACT SHEET: Designation of National Interest Electric Transmission Corridors,As Authorized by the Energy Policy Act of 2005

  10. Segmented rail linear induction motor

    DOE Patents [OSTI]

    Cowan, M. Jr.; Marder, B.M.

    1996-09-03

    A segmented rail linear induction motor has a segmented rail consisting of a plurality of nonferrous electrically conductive segments aligned along a guideway. The motor further includes a carriage including at least one pair of opposed coils fastened to the carriage for moving the carriage. A power source applies an electric current to the coils to induce currents in the conductive surfaces to repel the coils from adjacent edges of the conductive surfaces. 6 figs.

  11. Segmented rail linear induction motor

    DOE Patents [OSTI]

    Cowan, Jr., Maynard; Marder, Barry M.

    1996-01-01

    A segmented rail linear induction motor has a segmented rail consisting of a plurality of nonferrous electrically conductive segments aligned along a guideway. The motor further includes a carriage including at least one pair of opposed coils fastened to the carriage for moving the carriage. A power source applies an electric current to the coils to induce currents in the conductive surfaces to repel the coils from adjacent edges of the conductive surfaces.

  12. Washington Closure Hanford: Ten Years of River Corridor Cleanup |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Washington Closure Hanford: Ten Years of River Corridor Cleanup Washington Closure Hanford: Ten Years of River Corridor Cleanup December 17, 2015 - 12:30pm Addthis Contract-Timeline-E1511010_4-B_756px.jpg This timeline shows contractor Washington Closure Hanford's accomplishments over the past 10 years through its River Corridor Closure Contract. Addthis Related Articles EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site River Corridor Achievements

  13. An Inside Look at River Corridor

    Broader source: Energy.gov [DOE]

    In the seventh chapter of The Handford Story, the Energy Department takes a look at the River Corridor -- a 50-mile stretch of the Columbia River that flows through the Hanford site in southeast...

  14. EIS-0250-S2 and EIS-0369: Draft Supplemental Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain—Nevada Rail Transportation Corridor and Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada

  15. EIS-0250-S2 and EIS-0369: Final Supplemental Environmental Impact Statement

    Broader source: Energy.gov [DOE]

    Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada—Nevada Rail Transportation Corridor and Rail Alignment for the Construction and Operation of a Railroad in Nevada to a Geologic Repository at Yucca Mountain, Nye County, Nevada

  16. DOE - Office of Legacy Management -- Nevada

    Office of Legacy Management (LM)

    Nevada Nevada nvmap Central Nevada Test Area Site Shoal Site Last Updated: 12/14

  17. TEC Working Group Topic Groups Rail Conference Call Summaries...

    Office of Environmental Management (EM)

    Summaries Rail Topic Group TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic Group Rail Topic Group PDF icon May 17, 2007 PDF icon January 16, 2007 PDF icon...

  18. Nevada Offsites Fact Sheet

    Broader source: Energy.gov [DOE]

    The Nevada Offsites refers to sites where underground nuclear tests and experiments were performed outside of the primary testing location formerly known as the Nevada Test Site (now the Nevada...

  19. Lyon County, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Places in Lyon County, Nevada Dayton, Nevada Fernley, Nevada Silver Springs, Nevada Smith Valley, Nevada Wabuska, Nevada Yerington, Nevada Retrieved from "http:en.openei.org...

  20. Washoe County, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Nevada Spanish Springs, Nevada Sparks, Nevada Sun Valley, Nevada Sutcliffe, Nevada Verdi-Mogul, Nevada Wadsworth, Nevada Retrieved from "http:en.openei.orgw...

  1. Nevada Site Offce's Talbot

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Security Administration (NNSA) Nevada Site Offce (NSO) manager, says Complex ... "The activities that occur at the Nevada Test Site (NTS) provide a very specifc value ...

  2. Nevada Test Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    in greater detail in the Nevada Test Site Environ- mental Report 2004 (DOENV11718-1080). ... mental programs and efforts Nevada Test Site Environmental Report 2004 Summary ...

  3. Nevada Lawyer Magazine: Overview of Water Law in Nevada | Open...

    Open Energy Info (EERE)

    in Nevada Internet. Nevada. cited 20141111. Available from: http:nvbar.orgarticlescontentoverview-water-law-nevada Related Files NevLawyer Sept 2009 Water Law...

  4. Interstate Clean Transportation Corridor Project Under Way

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    rucks that travel in the western United States will soon be able to operate clean-burning alternative fuel vehicles (AFVs) along the Interstate Clean Transpor- tation Corridor (ICTC). The ICTC project is the first effort to develop clean transportation corridors to connect Los Angeles, San Bernar- dino, the San Joaquin Valley, Sacra- mento/San Francisco, Salt Lake City, Reno, and Las Vegas along routes 1-15, 1-80, and 1-5/CA-99. The ICTC team, headed by California- based Gladstein and

  5. PRB rail loadings shatter record

    SciTech Connect (OSTI)

    Buchsbaum, L.

    2008-09-15

    Rail transport of coal in the Powder River Basin has expanded, with a record 2,197 trains loaded in a month. Arch Coal's Thunder basin mining complex has expanded by literally bridging the joint line railway. The dry fork mine has also celebrated its safety achievements. 4 photos.

  6. Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Surpasses 1 Million Gallons Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons to someone by E-mail Share Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Facebook Tweet about Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Twitter Bookmark Alternative Fuels Data Center: Pennsylvania's Ethanol Corridor Project Surpasses 1 Million Gallons on Google Bookmark Alternative

  7. DOE Affirms National Interest Electric Transmission Corridor Designations |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Affirms National Interest Electric Transmission Corridor Designations DOE Affirms National Interest Electric Transmission Corridor Designations March 6, 2008 - 11:54am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today denied requests for rehearing of the Mid-Atlantic and the Southwest Area National Interest Electric Transmission Corridors (National Corridors) designated by DOE in October 2007 as areas of significant electricity congestion and constraint.

  8. Microsoft PowerPoint - Rail_Kneitel [Compatibility Mode]

    Office of Environmental Management (EM)

    1 Shipping Radioactive Waste by Rail from Brookhaven National Laboratory Terri Kneitel, PE, PMP U.S. Department of Energy National Transportation Stakeholders Forum May 14, 2014 2 Discussion Topics * Why Rail? * How is waste shipped? * What do we ship by rail? * DOT Requirements * Where does the waste go? * Logistics * BNL Rail Shipment Overview * Extensive Outreach - BNL Transportation Working Group * BNL Rail Shipment & Notification Protocols 5/16/2014 2 3 Why Rail? Rail * 1 car hauls

  9. Nevada Science of Aerospace

    SciTech Connect (OSTI)

    Jason Marcks

    2004-07-01

    Funding was used to operate the educational program entitled the Nevada Science of Aerospace Project.

  10. DOE Issues Two Draft National Interest Electric Transmission Corridor Designations

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Secretary Samuel W. Bodman today announced the issuance of two draft National Interest Electric Transmission Corridor (National Corridor) designations. The Energy Policy Act of 2005 authorizes the Secretary, based on the findings of DOE's National Electric Transmission Congestion Study (Congestion Study), to designate National Corridors.

  11. EIA - Natural Gas Pipeline Network - Natural Gas Transportation Corridors

    U.S. Energy Information Administration (EIA) Indexed Site

    Map Corridors > Major U.S. Natural Gas Transportation Corridors Map About U.S. Natural Gas Pipelines - Transporting Natural Gas based on data through 2007/2008 with selected updates Major U.S. Natural Gas Transportation Corridors, 2008

  12. TEC Working Group Topic Groups Rail Key Documents Intermodal Subgroup |

    Office of Environmental Management (EM)

    Department of Energy Intermodal Subgroup TEC Working Group Topic Groups Rail Key Documents Intermodal Subgroup Intermodal Subgroup Draft Work Plan (206.83 KB) More Documents & Publications TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Intermodal Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic Group

  13. Nevada potential repository preliminary transportation strategy: Study 1

    SciTech Connect (OSTI)

    None,

    1995-04-01

    Limited feasible options exist when considering the shipment of spent nuclear fuel and high-level radioactive waste. These options are rail or truck; because of the weight associated with transportation casks (68.0 to 113.4 tonnes/75 to 125 tons), heavy-haul trucks are also considered. Yucca Mountain currently lacks rail service or an existing right-of-way for rail; it also lacks a dedicated highway suitable for heavy-haul trucks. Approximately 11,230 shipments by rail are planned from waste producer sites to Nevada, with an additional 1,041 shipments by legal-weight truck from four reactor sites not capable of upgrading for rail shipment. This study identifies the reasonable alternatives for waste transport to the potential repository site, describes the evaluation process performed to identify those alternatives, and discusses the reasons for elimination of transportation routes deemed to be not reasonable. The study concluded that heavy haul truck transportation is feasible-cost is very favorable when compared to rail-but route restrictions must be further evaluated. In addition to restrictions due to seasonal weather conditions, specific routes have additional restrictions, including no travel on holidays or weekends, and travel during daylight hours only. Further restrictions will be imposed by the U.S. Department of Transportation based on routing of radioactive materials by highway. Operation and maintenance costs for heavy-haul over a 24-year period, based on preliminary information, were calculated on an estimated operational cost of $15,000 per trip, with an estimated 468 trips per year average (11,230 total trips), for an estimated cost of $171 million to $173 million, depending on the route used. Because the initial costs and the total system life cycle costs of heavy-haul are approximately 50 percent lower than the lowest rail cost, this option will continue to be evaluated.

  14. Top-of-Rail lubricant

    SciTech Connect (OSTI)

    Alzoubi, M. F.; Fenske, G. R.; Erck, R. A.; Boparai, A. S.

    2000-07-14

    Analysis of the volatile and semivolatile fractions collected after use of the TOR lubricant indicated that other than contaminants in the collection laboratory, no compounds on the EPA's Target Compound Lists (Tables 2 and 5) were detected in these fractions. The data of these qualitative analyses, given in the various tables in the text, indicate only the relative amounts of the tentatively identified compounds. The authors recommend that quantitative analysis be performed on the volatile and semivolatile fractions to allow confirmation of the tentatively identified compounds and to obtain absolute amounts of the detected compounds. Additionally, the semivolatile fraction should be analyzed by liquid chromatography/mass spectrometry to identify compounds that are not chromatographable under the temperature program used for determination of semivolatile compounds. Introducing the top-of-rail (TOR) lubricant into the wheel/rail interface results in a reduction of almost 60% of lateral friction force over the forces encountered under dry conditions. This reveals good potential for energy savings, as well as wear reduction, for railroad companies. In TOR lubrication, an increase in the angle of attack and axle load results in increased lateral friction and rate of lubricant consumption. The most efficient TOR lubricant quantity to be used in the wheel/rail interface must be calculated precisely according to the number of cars, axle loads, train speed, and angle of attack.

  15. Rail-to-rail differential input amplification stage with main and surrogate differential pairs

    DOE Patents [OSTI]

    Britton, Jr., Charles Lanier; Smith, Stephen Fulton

    2007-03-06

    An operational amplifier input stage provides a symmetrical rail-to-rail input common-mode voltage without turning off either pair of complementary differential input transistors. Secondary, or surrogate, transistor pairs assume the function of the complementary differential transistors. The circuit also maintains essentially constant transconductance, constant slew rate, and constant signal-path supply current as it provides rail-to-rail operation.

  16. TEC Working Group Topic Groups Rail Conference Call Summaries | Department

    Office of Environmental Management (EM)

    of Energy Rail Conference Call Summaries TEC Working Group Topic Groups Rail Conference Call Summaries CONFERENCE CALL SUMMARIES Rail Topic Group Inspections Subgroup Planning Subgroup Tracking Subgroup TRAGIS Subgroup Radiation Monitoring Subgroup Intermodel Subgroup

  17. Nevada Department of Transportation - 2004 Nevada Commercial...

    Open Energy Info (EERE)

    Abstract This handbook serves as a quick reference for the professional commercial motor carrier in Nevada. Author NDOT Published NDOT, 2004 DOI Not Provided Check for DOI...

  18. ONE NEVADA LINE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE PROJECT SUMMARY In February 2011, the Department of Energy issued a $343 million loan guarantee to finance the One Nevada Transmission Line (ON Line) project, a 235-mile, 500 kV AC transmission line capable of carrying 600 MW of power to the grid running

  19. Advanced Diesel Common Rail Injection System for Future Emission...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Common Rail Injection System for Future Emission Legislation Advanced Diesel Common Rail Injection System for Future Emission Legislation 2004 Diesel Engine Emissions Reduction ...

  20. Impacts of Rail Pressure and Biodiesel Composition on Soot Nanostructu...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rail Pressure and Biodiesel Composition on Soot Nanostructure Impacts of Rail Pressure and Biodiesel Composition on Soot Nanostructure Fractal dimensions of particle aggregates and ...

  1. TEC Working Group Topic Groups Rail Meeting Summaries | Department...

    Office of Environmental Management (EM)

    TEC Working Group Topic Groups Rail Meeting Summaries MEETING SUMMARIES PDF icon Kansas City TEC Meeting, Rail Topic Group Summary - July 25, 2007 PDF icon Atlanta TEC...

  2. Nevada National Security Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    April 24, 2014 Cultural Artifacts Cross Eras at the Nevada National Security Site It is well known that the Nevada National Security Site (NNSS) is home to many artifacts from the ...

  3. Agencies Publish Final Environmental Impact Statement on Energy Corridor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Designation in the West | Department of Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 2:07pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The

  4. Agencies Publish Final Environmental Impact Statement on Energy Corridor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Designation in the West | Department of Energy Final Environmental Impact Statement on Energy Corridor Designation in the West Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West November 26, 2008 - 4:58pm Addthis WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The

  5. Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    $300 Million | Department of Energy Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million December 17, 2015 - 12:35pm Addthis A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. RICHLAND, Wash. - The River Corridor Closure

  6. Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor Presentation from the 2015 DOE National Cleanup Workshop by Scott Sax, President, Washington Closure Hanford. Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor (10.41 MB) More Documents & Publications 2014 Congressional Nuclear Cleanup Caucus Briefings 2013 Congressional Nuclear Cleanup

  7. Department of Energy Awards Hanford River Corridor Contract To...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Inc., Bechtel National Inc., CH2M Hill Inc., Eberline Services Inc., and Integrated Logistics Services Inc. The Columbia River Corridor is composed of roughly 210 square miles...

  8. Vermont Flood Hazard Area and River Corridor General Permit Applicatio...

    Open Energy Info (EERE)

    the developer should provide a map generated from the ANR Natural Resources Atlas showing the river corridor and flood hazard area; A written description of the...

  9. River Corridor Baseline Risk Assessment (RCBRA) Human Health...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    12, 2011 River Corridor Baseline Risk Assessment (RCBRA) Human Health Risk Assessment (Volume 2) * RCBRA Human Health Risk Assessment is final - Response provided to HAB ...

  10. Rail transportation of Fernald remediation waste

    SciTech Connect (OSTI)

    Fellman, R.T.; Lojek, D.A.; Motl, G.P.; Weddendorf, W.K.

    1995-01-24

    Remediation of the Department of Energy (DOE) Fernald site located north of Cincinnati will generate large quantities of low-level radwaste. This volume includes approximately 1,050,000 tons of material to be removed from eight waste pits comprising Operable Unit 1 (OU-1). The remedial alternative selected includes waste material excavation, drying and transportation by rail to a burial site in the arid west for disposal. Rail transportation was selected not only because rail transportation is safer than truck transportation, but also because of the sheer magnitude of the project and the availability of bulk rail car unloading facilities at a representative disposal site. Based upon current waste quantity estimates as presented in the Feasibility Study for OUI, a fully-loaded 47-car unit train would depart the Fernald site weekly for five years. This paper illustrates the steps taken to obtain agency and public acceptance of the Record of Decision for the remedy which hinged on rail transportation. A preliminary, but detailed, rail transportation plan was prepared for the project to support a series of CERCLA public meetings conducted in late 1994. Some of the major issues addressed in the plan included the following: (1) Scope of project leading to selection of rail transportation; (2) Waste classification; (3) Rail Company overview; (4) Train configuration and rail car selection; (5) Routing; (6) Safety; (7) Prior Notification Requirements (8) Emergency Response. A series of three public meetings identified a number of issues of prime concern to Fernald stakeholders. Following resolution of these issues during the public comment period, a Record of Decision (ROD) approving implementation of the rail transportation strategy was approved pending incorporation of EPA and State of Ohio comments on December 22, 1994.

  11. CNG Imports by Rail into the U.S. | Department of Energy

    Office of Environmental Management (EM)

    Rail into the U.S. CNG Imports by Rail into the U.S. CNG Imports by Rail Form (Excel) (40.5 KB) CNG Imports by Rail Form (pdf) (11.18 KB) More Documents & Publications LNG Exports by Rail out of the U.S. Other Imports by Rail into the U.S. Other Exports by Rail out of

  12. Voluntary Protection Program Onsite Review, WSI-Nevada - Nevada National

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Security Site - February 2012 | Department of Energy WSI-Nevada - Nevada National Security Site - February 2012 Voluntary Protection Program Onsite Review, WSI-Nevada - Nevada National Security Site - February 2012 February 2012 Evaluation to determine whether the Nevada National Security Site is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during February 13 - 22, 2012 to determine whether WSI-Nevada is continuing to perform at a level

  13. Moab Resumes Rail Shipments After Rockslide

    Broader source: Energy.gov [DOE]

    MOAB, Utah – EM’s Moab Uranium Mill Tailings Remedial Action Project recently resumed rail shipments after an almost two-month halt due to a major rockslide.

  14. Status of Energy in Nevada

    National Nuclear Security Administration (NNSA)

    System of Higher Education NSO - Nevada Solar One NSOE - Nevada State Office of Energy ... under one name and information provided in future reports will be provided as one. ...

  15. ORMAT NEVADA | Department of Energy

    Office of Environmental Management (EM)

    It is expected to prevent 301,000 metric tons of carbon dioxide emissions annually. PROJECT STATISTICS: ORMAT NEVADA PROJECT SUMMARY OWNERS Ormat Nevada, Inc. & Ormat ...

  16. Sierra Nevada Brewery

    SciTech Connect (OSTI)

    2007-05-01

    This is a combined heat and power (CHP) project profile on a 1 MW fuel cell CHP system at the Sierra Nevada Brewery in Chico, California.

  17. Requirements Definition for ORNL Trusted Corridors Project

    SciTech Connect (OSTI)

    Walker, Randy M; Hill, David E; Smith, Cyrus M; DeNap, Frank A; White, James D; Gross, Ian G; Gorman, Bryan L; Hively, Lee M; Abercrombie, Robert K

    2008-02-01

    The ORNL Trusted Corridors Project has several other names: SensorNet Transportation Pilot; Identification and Monitoring of Radiation (in commerce) Shipments (IMR(ic)S); and Southeastern Transportation Corridor Pilot (SETCP). The project involves acquisition and analysis of transportation data at two mobile and three fixed inspection stations in five states (Kentucky, Mississippi, South Carolina, Tennessee, and Washington DC). Collaborators include the State Police organizations that are responsible for highway safety, law enforcement, and incident response. The three states with fixed weigh-station deployments (KY, SC, TN) are interested in coordination of this effort for highway safety, law enforcement, and sorting/targeting/interdiction of potentially non-compliant vehicles/persons/cargo. The Domestic Nuclear Detection Office (DNDO) in the U.S. Department of Homeland Security (DHS) is interested in these deployments, as a Pilot test (SETCP) to identify Improvised Nuclear Devices (INDs) in highway transport. However, the level of DNDO integration among these state deployments is presently uncertain. Moreover, DHS issues are considered secondary by the states, which perceive this work as an opportunity to leverage these (new) dual-use technologies for state needs. In addition, present experience shows that radiation detectors alone cannot detect DHS-identified IND threats. Continued SETCP success depends on the level of integration of current state/local police operations with the new DHS task of detecting IND threats, in addition to emergency preparedness and homeland security. This document describes the enabling components for continued SETCP development and success, including: sensors and their use at existing deployments (Section 1); personnel training (Section 2); concept of operations (Section 3); knowledge discovery from the copious data (Section 4); smart data collection, integration and database development, advanced algorithms for multiple sensors, and

  18. ARM - Field Campaign - 1999 Northeast Corridor Ozone & Particulate Study

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Northeast Corridor Ozone & Particulate Study ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : 1999 Northeast Corridor Ozone & Particulate Study 1999.07.23 - 1999.08.11 Lead Scientist : Larry Kleinman For data sets, see below. Abstract As part of the 1999 NARSTO Northeast Corridor Oxidant and Particulate Study (NEC-OPS) field campaign, the DOE G-1 aircraft sampled trace gases and aerosols in and

  19. Final_Signed_Policy_Guidance_Memo_32A.pdf

    Office of Environmental Management (EM)

    for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final En | Department of Energy Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final En Final Supplemental Environmental Impact

  20. Final Supplemental Environmental Impact Statement for a Geologic Repository

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final En | Department of Energy Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation Corridor DOE/EIS-0250F-S2 and Final En Final Supplemental Environmental Impact

  1. Nevada Public Utilities Commission | Open Energy Information

    Open Energy Info (EERE)

    Name: Nevada Public Utilities Commission Abbreviation: NPUC Address: Southern Nevada Office, 9075 West Diablo Drive, Suite 250 Place: Las Vegas, Nevada Zip: 89148 Phone Number:...

  2. BLM Nevada State Office | Open Energy Information

    Open Energy Info (EERE)

    Office Jump to: navigation, search Logo: BLM Nevada State Office Name: BLM Nevada State Office Abbreviation: Nevada Address: 1340 Financial Blvd Place: Reno, NV Zip: 89502 Phone...

  3. Nevada State Clearinghouse | Open Energy Information

    Open Energy Info (EERE)

    Nevada State Clearinghouse Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Nevada State Clearinghouse Abstract The Nevada State Clearinghouse is an...

  4. Nevada Division of Minerals | Open Energy Information

    Open Energy Info (EERE)

    Logo: Nevada Division of Minerals Name: Nevada Division of Minerals Address: 400 W. King St. 106 Place: Carson City, Nevada Zip: 89703 Website: minerals.state.nv.us...

  5. Nevada/Incentives | Open Energy Information

    Open Energy Info (EERE)

    Type Active Boulder City Public Works - Energy Efficient Appliance Program (Nevada) Utility Rebate Program No EnergyFit Nevada (Nevada) State Rebate Program Yes Large Scale...

  6. West Vero Corridor, Florida: Energy Resources | Open Energy Informatio...

    Open Energy Info (EERE)

    Hide Map This article is a stub. You can help OpenEI by expanding it. West Vero Corridor is a census-designated place in Indian River County, Florida.1...

  7. H.R.S. 277 - Energy Corridors | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: H.R.S. 277 - Energy CorridorsLegal Abstract This statute outlines the law pertaining to...

  8. I-65 Clean Corridor: Fall Drive Overview and Media Summary

    Broader source: Energy.gov [DOE]

    At the May 1, 2008 joint quarterly Web conference of DOE's Biomass and Clean Cities programs, Julie Howe (Indiana Office of Energy & Defense Development) described the I-65 Corridor Project.

  9. Voluntary Protection Program Onsite Review, River Corridor Closure...

    Broader source: Energy.gov (indexed) [DOE]

    Evaluation to determine whether River Corridor Closure Project is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during June 11...

  10. Energy Transport Corridor Draft Environmental Impact Statement Available

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    for Review | Department of Energy Transport Corridor Draft Environmental Impact Statement Available for Review Energy Transport Corridor Draft Environmental Impact Statement Available for Review August 1, 2008 - 3:08pm Addthis The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense are anticipating a summer release of a Final Programmatic Environmental Impact Statement (PEIS) proposing designation of energy

  11. Keeping Climate Change Solutions on Track: The Role of Rail ...

    Open Energy Info (EERE)

    Keeping Climate Change Solutions on Track: The Role of Rail Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Keeping Climate Change Solutions on Track: The Role of Rail...

  12. Advanced Diesel Common Rail Injection System for Future Emission Legislation

    Broader source: Energy.gov [DOE]

    2004 Diesel Engine Emissions Reduction (DEER) Conference Presentation: Robert Bosch GMBH Common Rail System Engineering for PC Diesel Systems

  13. TEC Working Group Topic Groups Rail Archived Documents | Department of

    Office of Environmental Management (EM)

    Energy Archived Documents TEC Working Group Topic Groups Rail Archived Documents ARCHIVED DOCUMENTS Inspections Summary Matrix (49.36 KB) TEC Transportation Safety WIPP-PIG Rail Comparison (130.46 KB) Regulatory Summary Matrix (62.08 KB) More Documents & Publications TEC Working Group Topic Groups Rail Key Documents TEC Working Group Topic Groups Rail Meeting Summaries TEC Meeting Summaries - September 2005 Presentations

  14. TEC Working Group Topic Groups Rail Conference Call Summaries Inspections

    Office of Environmental Management (EM)

    Subgroup | Department of Energy Summaries Inspections Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Inspections Subgroup Inspections Subgroup April 6, 2006 (14.05 KB) February 23, 2006 Draft (20.29 KB) January 24, 2006 (27.44 KB) More Documents & Publications TEC Working Group Topic Groups Rail Conference Call Summaries Planning Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Tracking Subgroup TEC Working Group Topic Groups Rail Conference

  15. TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring

    Office of Environmental Management (EM)

    Subgroup | Department of Energy Radiation Monitoring Subgroup TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring Subgroup Radiation Monitoring Subgroup Draft Work Plan - February 4, 2008 (114.02 KB) More Documents & Publications TEC Working Group Topic Groups Rail Meeting Summaries TEC Working Group Topic Groups Rail Conference Call Summaries Radiation Monitoring Subgroup TEC Working Group Topic Groups Rail Key Documents Intermodal Subgroup

  16. RIVER CORRIDOR BUILDINGS 324 & 327 CLEANUP

    SciTech Connect (OSTI)

    BAZZELL, K.D.; SMITH, B.A.

    2006-02-09

    A major challenge in the recently awarded River Corridor Closure (RCC) Contract at the U.S. Department of Energy's (DOE) Hanford Site is decontaminating and demolishing (D&D) facilities in the 300 Area. Located along the banks of the Columbia River about one mile north of Richland, Washington, the 2.5 km{sup 2} (1 mi{sup 2})300 Area comprises only a small part of the 1517 km{sup 2} (586 mi{sup 2}) Hanford Site. However, with more than 300 facilities ranging from clean to highly contaminated, D&D of those facilities represents a major challenge for Washington Closure Hanford (WCH), which manages the new RCC Project for DOE's Richland Operations Office (RL). A complicating factor for this work is the continued use of nearly a dozen facilities by the DOE's Pacific Northwest National Laboratory (PNNL). Most of the buildings will not be released to WCH until at least 2009--four years into the seven-year, $1.9 billion RCC Contract. The challenge will be to deactivate, decommission, decontaminate and demolish (D4) highly contaminated buildings, such as 324 and 327, without interrupting PNNL's operations in adjacent facilities. This paper focuses on the challenges associated with the D4 of the 324 Building and the 327 Building.

  17. Life-Cycle Cost and Risk Analysis of Alternative Configurations for Shipping Low-Level Radioactive Waste to the Nevada Test Site

    SciTech Connect (OSTI)

    PM Daling; SB Ross; BM Biwer

    1999-12-17

    The Nevada Test Site (NTS) is a major receiver of low-level radioactive waste (LLW) for disposal. Currently, all LLW received at NTS is shipped by truck. The trucks use highway routes to NTS that pass through the Las Vegas Valley and over Hoover Dam, which is a concern of local stakeholder groups in the State of Nevada. Rail service offers the opportunity to reduce transportation risks and costs, according to the Waste Management Programmatic Environmental Impact Statement (WM-PEIS). However, NTS and some DOE LLW generator sites are not served with direct rail service so intermodal transport is under consideration. Intermodal transport involves transport via two modes, in this case truck and rail, from the generator sites to NTS. LLW shipping containers would be transferred between trucks and railcars at intermodal transfer points near the LLW generator sites, NTS, or both. An Environmental Assessment (EA)for Intermodal Transportation of Low-Level Radioactive Waste to the Nevada Test Site (referred to as the NTSIntermodal -M) has been prepared to determine whether there are environmental impacts to alterations to the current truck routing or use of intermodal facilities within the State of Nevada. However, an analysis of the potential impacts outside the State of Nevada are not addressed in the NTS Intermodal EA. This study examines the rest of the transportation network between LLW generator sites and the NTS and evaluates the costs, risks, and feasibility of integrating intermodal shipments into the LLW transportation system. This study evaluates alternative transportation system configurations for NTS approved and potential generators based on complex-wide LLW load information. Technical judgments relative to the availability of DOE LLW generators to ship from their sites by rail were developed. Public and worker risk and life-cycle cost components are quantified. The study identifies and evaluates alternative scenarios that increase the use of rail (intermodal

  18. Nevada National Security Site

    National Nuclear Security Administration (NNSA)

    Nevada National Security Site Proud Past, Exciting Future Nevada National Security Site Pre-Proposal Meeting November 19, 2015 Agenda * 8:30 am Welcome * 9:00 am Overview of NNSS and NFO * 10:00 am Break * 10:30 am NNSS Video * 11:00 am Questions * 11:30 am Lunch * 1:00 pm Solicitation Overview * 2:15 pm Break * 2:45 pm Questions * 4:00 pm Conclusion The Nevada National Security Site * Large geographically diverse outdoor laboratory - 1,360 square miles of federally owned and controlled land -

  19. Nevada Geothermal Area | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada Geothermal Area Nevada Geothermal Area The extensive Steamboat Springs geothermal area contains three geothermal power-generating plants. The plants provide approximately 30% of the total Nevada geothermal power output. Photo of Nevada power plant

  20. Stakeholder Transportation Scorecard: Reviewing Nevada's Recommendations for Enhancing the Safety and Security of Nuclear Waste Shipments - 13518

    SciTech Connect (OSTI)

    Dilger, Fred C.; Ballard, James D.; Halstead, Robert J.

    2013-07-01

    As a primary stakeholder in the Yucca Mountain program, the state of Nevada has spent three decades examining and considering national policy regarding spent nuclear fuel and high-level radioactive waste transportation. During this time, Nevada has identified 10 issues it believes are critical to ensuring the safety and security of any spent nuclear fuel transportation program, and achieving public acceptance. These recommendations are: 1) Ship the oldest fuel first; 2) Ship mostly by rail; 3) Use dual-purpose (transportable storage) casks; 4) Use dedicated trains for rail shipments; 5) Implement a full-scale cask testing program; 6) Utilize a National Environmental Policy Act (NEPA) process for the selection of a new rail spur to the proposed repository site; 7) Implement the Western Interstate Energy Board (WIEB) 'straw man' process for route selection; 8) Implement Section 180C assistance to affected States, Tribes and localities through rulemaking; 9) Adopt safety and security regulatory enhancements proposed states; and 10) Address stakeholder concerns about terrorism and sabotage. This paper describes Nevada's proposals in detail and examines their current status. The paper describes the various forums and methods by which Nevada has presented its arguments and sought to influence national policy. As of 2012, most of Nevada's recommendations have been adopted in one form or another, although not yet implemented. If implemented in a future nuclear waste program, the State of Nevada believes these recommendations would form the basis for a successful national transportation plan for shipments to a geologic repository and/or centralized interim storage facility. (authors)

  1. Nevada National Security Site

    Office of Energy Efficiency and Renewable Energy (EERE)

    HISTORYIn 1950, President Truman established what is now known as the Nevada National Security Site (NNSS) to perform nuclear weapons testing activities.  In support of national defense initiatives...

  2. Special Nevada report

    SciTech Connect (OSTI)

    1991-09-23

    This report is submitted to Congress by the Secretary of the Air Force, the Secretary of the Navy, and the Secretary of the Interior pursuant to Section 6 of the Military Lands Withdrawal Act of 1986. It contains an analysis and evaluation of the effects on public health and safety resulting from DOD and Department of Energy (DOE) military and defense-related uses on withdrawn public lands in the State of Nevada and in airspace overlying the State. This report describes the cumulative impacts of those activities on public and private property in Nevada and on plants, fish and wildlife, cultural, historic, scientific, recreational, wilderness and other resources of the public lands of Nevada. An analysis and evaluation of possible measures to mitigate the cumulative effects of the withdrawal of lands and the use of airspace in Nevada for defense-related purposes was conducted, and those considered practical are listed.

  3. nevada national security site

    National Nuclear Security Administration (NNSA)

    7%2A en Nevada National Security Site operator recognized for green fleet http:www.nnsa.energy.govblognevada-national-security-site-operator-recognized-green-fleet

    The...

  4. TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic

    Office of Environmental Management (EM)

    Group | Department of Energy Summaries Rail Topic Group TEC Working Group Topic Groups Rail Conference Call Summaries Rail Topic Group Rail Topic Group May 17, 2007 (10.98 KB) January 16, 2007 (14.41 KB) August 31, 2006 (16.39 KB) July 27, 2006 (19.28 KB) June 8, 2006 (15.79 KB) April 20, 2006 (19.91 KB) March 9, 2006 (19.65 KB) January 26, 2006 (20.86 KB) November 9, 2005 (24.38 KB) September 15, 2005 (32.13 KB) April 28, 2005 (19.16 KB) March 24, 2005 (28.33 KB) February 24, 2005 (32.77

  5. Nevada STEP Training

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Department of Energy Nevada Plant Adds Jobs, Moves America Forward in Solar Production Nevada Plant Adds Jobs, Moves America Forward in Solar Production June 23, 2011 - 4:37pm Addthis Lindsey Geisler Lindsey Geisler Public Affairs Specialist, Office of Public Affairs It's always exciting when efforts to move new energy technology forward also lead to new job creation. Earlier today, Secretary Chu was invited to tour the new Amonix solar power system manufacturing plant in North Las Vegas,

  6. Rail Networks Are Getting Smarter | GE Global Research

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Rail Networks Are Getting Smarter Click to email this to a friend (Opens in new window) Share on Facebook (Opens in new window) Click to share (Opens in new window) Click to share on LinkedIn (Opens in new window) Click to share on Tumblr (Opens in new window) RailConnect 360 makes rail networks and operations smarter RailConnect 360 includes Movement Planner, Yard Planner and Trip Optimizer RailConnect 360 increases efficiency Freight trains moving faster could save railroads millions yearly

  7. Rail gun development for EOS research

    SciTech Connect (OSTI)

    Fowler, C.M.; Peterson, D.R.; Hawke, R.S.; Brooks, A.L.

    1981-01-01

    The status of a railgun program for EOS research in progress at Los Alamos and Livermore National Laboratories is described. The operating principle of rail guns, the power supplies used to drive them, diagnostic techniques used to monitor their performance and initial efforts to develop projectiles suitable for EOS research are discussed. (WHK)

  8. Nevada Department of Conservation and Natural Resources' Nevada...

    Open Energy Info (EERE)

    Conservation and Natural Resources' Nevada Water Law 101 Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Nevada Department of Conservation and...

  9. CNG Exports by Rail out of the U.S. | Department of Energy

    Office of Environmental Management (EM)

    Rail out of the U.S. CNG Exports by Rail out of the U.S. CNG Exports by Rail Form (Excel) (40.5 KB) CNG Exports by Rail Form (pdf) (11.06 KB) More Documents & Publications CNG Imports by Rail into the U.S. Other Exports by Rail out of the U.S. LNG Exports by Rail out of the U.S.

  10. DOE - NNSA/NFO -- Nevada National Security Site Tours

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevada National Security Site Tours NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Photograph of Nevada National Security Site Tour The Nevada Field Office provides ...

  11. Lincoln County, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Number 5 Climate Zone Subtype B. Places in Lincoln County, Nevada Caliente, Nevada Mercury, Nevada Retrieved from "http:en.openei.orgwindex.php?titleLincolnCounty,Nevada...

  12. Nevada Site Specific Advisory Board

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    then choose print Page 2 Map of the Nevada National Security Site (NNSS) and the (8) ... through September 2015 (FY 2015) Name Nevada Site Specific Advisory Board 232 Energy ...

  13. Nevada Waste Leaves Idaho Facility

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevada Waste Leaves Idaho Facility (Note: This is a reissue of a press release originally ... 15 the afternoon of January 26 actually contained waste from another DOE site in Nevada. ...

  14. ORMAT NEVADA | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ORMAT NEVADA ORMAT NEVADA DOE-LPO_Project-Posters_GEO_Ormat-Nevada.pdf (841.29 KB) More Documents & Publications EA-1849: Finding of No Significant Impact EA-1849-S1: Finding of No Significant Impact EA-1849: Final Environmental Assessment

  15. File:03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf | Open...

    Open Energy Info (EERE)

    HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Jump to: navigation, search File File history File usage Metadata File:03HIFPermitToCrossOrEnterTheStateEnergyCorridor.pdf Size of...

  16. USDOE Top-of-Rail Lubricant Project

    SciTech Connect (OSTI)

    Mohumad F. Alzoubi; George R. Fenske; Robert A. Erck; Amrit S. Boparai

    2002-02-01

    Lubrication of wheel/rail systems has been recognized for the last two decades as a very important issue for railroads. Energy savings and less friction and wear can be realized if a lubricant can be used at the wheel/rail interface. On the other hand, adverse influences are seen in operating and wear conditions if improper or excessive lubrication is used. Also, inefficiencies in lubrication need to be avoided for economic and environmental reasons. The top-of-rail (TOR) lubricant concept was developed by Texaco Corporation to lubricate wheels and rails effectively and efficiently. Tranergy Corporation has been developing its SENTRAEN 2000{trademark} lubrication system for the last ten years, and this revolutionary new high-tech on-board rail lubrication system promises to dramatically improve the energy efficiency, performance, safety, and track environment of railroads. The system is fully computer-controlled and ensures that all of the lubricant is consumed as the end of the train passes. Lubricant quantity dispensed is a function of grade, speed, curve, and axle load. Tranergy also has its LA4000{trademark} wheel and rail simulator, a lubrication and traction testing apparatus. The primary task of this project was collecting and analyzing the volatile and semivolatile compounds produced as the lubricant was used. The volatile organic compounds were collected by Carbotrap cartridges and analyzed by adsorption and gas chromatography/mass spectrometry (GC/MS). The semivolatile fraction was obtained by collecting liquid that dripped from the test wheel. The collected material was also analyzed by GC/MS. Both of these analyses were qualitative. The results indicated that in the volatile fraction, the only compounds on the Environmental Protection Agency's (EPA) Superfund List of Analytes detected were contaminants either in the room air or from other potential contamination sources in the laboratory. Similarly, in the semivolatile fraction none of the detected

  17. Workers Demolish Reactor Support Facility as Part of River Corridor

    Office of Environmental Management (EM)

    Contract | Department of Energy Demolish Reactor Support Facility as Part of River Corridor Contract Workers Demolish Reactor Support Facility as Part of River Corridor Contract July 3, 2014 - 12:00pm Addthis The site of the former 183-B Clearwell, an old water treatment facility for the historic B Reactor. The site of the former 183-B Clearwell, an old water treatment facility for the historic B Reactor. An aerial view of the site of the former 183-B Clearwell. An aerial view of the site of

  18. EM Update Newsletter Spotlights River Corridor Cleanup at Hanford Site

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – In this issue of the EM Update newsletter, EM marks the many accomplishments the Richland Operations Office and its contractors have achieved in cleanup along the Columbia River corridor at the Hanford Site. This year marked the 10th anniversary of the River Corridor Closure Contract, the nation’s largest environmental cleanup closure project, managed by Washington Closure Hanford. The work has involved projects to clean up existing contamination and waste sites near the river, preventing contamination from reaching it, and cocooning or demolishing hundreds of structures no longer in use, including former reactors along the river that helped create materials for the U.S. nuclear weapons program.

  19. A Survey of Vegetation and Wildland Fire Hazards on the Nevada Test Site, September 2004

    SciTech Connect (OSTI)

    Bechtel Nevada

    2004-09-01

    In the spring of 2004 a survey was conducted by Bechtel Nevada Ecological Services on the Nevada Test Site to characterize vegetation resources and climatic components of the environment that contribute to wildland fires. The field surveyed assessed 211 sites along major Nevada Test Site corridors for the abundance of native perennial and annual species and invasive weeds. The abundance of fine-textured (grasses and herbs) and coarse-textured (woody) biomass was visually estimated on numerical scales ranging from one to five. Wildland fires are costly to control and to mitigate once they occur. Revegetation of burned areas is very slow without reseeding or transplanting with native species and other rehabilitation efforts. Untreated areas become much more vulnerable to future fires once invasive species, rather than native species, colonize a burned area.The annual assessment of wildland fire hazards on the Nevada Test Site is scheduled to be implemented each spring in the near future with results being reported directly to the U.S. Department of Energy and the Bechtel Nevada Fire Marshal.

  20. Implications of the Baltimore Rail Tunnel Fire for Full-Scale Testing of Shipping Casks

    SciTech Connect (OSTI)

    Halstead, R. J.; Dilger, F.

    2003-02-25

    The U.S. Nuclear Regulatory Commission (NRC) does not currently require full-scale physical testing of shipping casks as part of its certification process. Stakeholders have long urged NRC to require full-scale testing as part of certification. NRC is currently preparing a full-scale casktesting proposal as part of the Package Performance Study (PPS) that grew out of the NRC reexamination of the Modal Study. The State of Nevada and Clark County remain committed to the position that demonstration testing would not be an acceptable substitute for a combination of full-scale testing, scale-model tests, and computer simulation of each new cask design prior to certification. Based on previous analyses of cask testing issues, and on preliminary findings regarding the July 2001 Baltimore rail tunnel fire, the authors recommend that NRC prioritize extra-regulatory thermal testing of a large rail cask and the GA-4 truck cask under the PPS. The specific fire conditions and other aspects of the full-scale extra-regulatory tests recommended for the PPS are yet to be determined. NRC, in consultation with stakeholders, must consider past real-world accidents and computer simulations to establish temperature failure thresholds for cask containment and fuel cladding. The cost of extra-regulatory thermal testing is yet to be determined. The minimum cost for regulatory thermal testing of a legal-weight truck cask would likely be $3.3-3.8 million.

  1. Contractors Cleaned Up Most of Hanford Site's River Corridor, But Work Remains

    Broader source: Energy.gov [DOE]

    RICHLAND, Wash. – Washington Closure Hanford and previous contractors have completed much of the cleanup work in the River Corridor.

  2. RAIL ROUTING PRACTICES AND PROPOSED ALTERNATIVES

    Office of Environmental Management (EM)

    on "Strawman" Report: RAIL ROUTING PRACTICES AND PROPOSED ALTERNATIVES Number Section Comment Response RTG-1-AAR SECTION II Safeguards Routing Regulations, Para. 2 The NRC has identified five types of route characteristics that receive special consideration when NRC staff review routes for approval pursuant to 10 CFR 73: (1) routes through highly populated areas; (2) routes that would place the shipment or escort vehicle in a significantly disadvantageous position (for example, tunnels

  3. Nevada National Security Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Proud Past, Exciting Future Nevada National Security Site Pre-Proposal Meeting November 19, 2015 Agenda * 8:30 am Welcome * 9:00 am Overview of NNSS and NFO * 10:00 am Break * 10:30 am NNSS Video * 11:00 am Questions * 11:30 am Lunch * 1:00 pm Solicitation Overview * 2:15 pm Break * 2:45 pm Questions * 4:00 pm Conclusion The Nevada National Security Site * Large geographically diverse outdoor laboratory - 1,360 square miles of federally owned and controlled land - Surrounded by 4,500 square

  4. Nevada Site Office News

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NNSA/NSO Office of Public Affairs http://www.nv.doe.gov P.O. Box 98518 Las Vegas, NV 89193-8518 News Media Contact: For Immediate Release: Darwin J. Morgan December 13, 2011 morgan@nv.doe.gov Kelly J. Snyder snyderk@nv.doe.gov 702-295-3521 New Support Services Contract Awarded for Nevada Site Office A new support services contract has been awarded at the National Nuclear Security Administration's Nevada Site Office. J.G. Management Systems, Inc., of Grand Junction, Colorado, will provide office

  5. Closure Report for Corrective Action Unit 523: Housekeeping Waste, Nevada Test Site, Nevada

    SciTech Connect (OSTI)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

    2003-11-01

    This closure report documents the closure activities conducted for Corrective Action Unit 523: Housekeeping Waste, Nevada Test Site, Nevada.

  6. EIS-0250-S1 and EIS-0250-S2: EPA Notice of Availability of the Draft Supplemental Environmental Impact Statements

    Office of Energy Efficiency and Renewable Energy (EERE)

    Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, NV and Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada--Nevada Rail Transportation Corridor

  7. EIS-0250-S1 and EIS-0250-S2: DOE Notice of Availability of the Draft Supplemental Environmental Impact Statements

    Broader source: Energy.gov [DOE]

    Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, NV and Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada--Nevada Rail Transportation Corridor

  8. Cleaning Up the Hanford River Corridor and Improving Site Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Jon Peschong, Deputy Assistant Manager for the River and Plateau, Department of Energy Richland Operations Office September 2014 2 Richland Cleanup Priorities * Maintain safe, secure and compliant activities, facilities and operations * Continue River Corridor cleanup, including remediation of 618-10 Burial Ground * Continue Plutonium Finishing Plant deactivation, decommissioning and demolition * Continue groundwater pump and treat operations, and implement additional groundwater remedies 3

  9. Cleaning Up the Hanford River Corridor and Improving Site Operations

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Stacy Charboneau, Assistant Manager for Safety and Environment, Department of Energy Richland Operations Office June 2014 2 Richland Cleanup Priorities * Maintain safe, secure and compliant activities, facilities and operations * Continue River Corridor cleanup, including remediation of 618-10 Burial Ground * Continue Plutonium Finishing Plant deactivation, decommissioning and demolition * Continue groundwater pump and treat operations, and implement additional groundwater remedies 3 Richland

  10. TEC Working Group Topic Groups Rail Key Documents Planning Subgroup |

    Office of Environmental Management (EM)

    Department of Energy Planning Subgroup TEC Working Group Topic Groups Rail Key Documents Planning Subgroup Planning Subgroup Rail Planning Timeline (135.57 KB) Benchmarking Project: AREVA Trip Report (651.92 KB) More Documents & Publications TEC Meeting Summaries - July 2007 Evaluation of Shortline Railroads & SNF/HLW Rail Shipment Inspections Tasked for the Transportation of Spent Nuclear Fuel Federal Railroad Administration

  11. TEC Working Group Topic Groups Rail | Department of Energy

    Office of Environmental Management (EM)

    The group's current task is to examine different aspects of rail transportation including inspections, tracking and radiation monitoring, planning and process, and review of ...

  12. TEC Working Group Topic Groups Rail Conference Call Summaries...

    Office of Environmental Management (EM)

    Summaries Inspections Subgroup TEC Working Group Topic Groups Rail Conference Call Summaries Inspections Subgroup Inspections Subgroup PDF icon April 6, 2006 PDF icon February 23,...

  13. TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring...

    Office of Environmental Management (EM)

    Radiation Monitoring Subgroup TEC Working Group Topic Groups Rail Key Documents Radiation Monitoring Subgroup Radiation Monitoring Subgroup PDF icon Draft Work Plan - February 4,...

  14. Naval Spent Fuel Rail Shipment Accident Exercise Objectives

    Office of Environmental Management (EM)

    NAVAL SPENT FUEL RAIL SHIPMENT ACCIDENT EXERCISE OBJECTIVES * Familiarize stakeholders with the Naval spent fuel ACCIDENT EXERCISE OBJECTIVES Familiarize stakeholders with the ...

  15. Hydrogen Assisted Diesel Combustion in a Common Rail Turbodiesel...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    a Compression Ignition Engine Advanced Diesel Combustion with Low Hydrocarbon and Carbon Monoxide Emissions Impacts of Rail Pressure and Biodiesel Composition on Soot Nanostructure

  16. CULTURAL RESOURCES MANAGEMENT PLAN FOR THE NEVADA TEST SITE

    National Nuclear Security Administration (NNSA)

    ... . . . . . . . . . . . . . . 38 5.5 Nevada Test Site . . . . . . . . . . . . . . . . . . . ... FIGURES Figure 1.1 Nevada Test Site . . . . . . . . . . . . . . . . . . . . . . . . . . . ...

  17. DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors

    Broader source: Energy.gov [DOE]

    U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability Kevin M. Kolevar today announced the Department's designation of two National Interest Electric Transmission Corridors (National Corridors) -- the Mid-Atlantic Area National Interest Electric Transmission Corridor, and the Southwest Area National Interest Electric Transmission Corridor. These corridors include areas in two of the Nation's most populous regions with growing electricity congestion problems. The Department based its designations on data and analysis showing that persistent transmission congestion exists in these two areas.

  18. Low-altitude remote sensing dataset of DEM and RGB mosaic for AB corridor on July 13 2013 and L2 corridor on July 21 2013

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Baptiste Dafflon

    2015-04-07

    Low-altitude remote sensing dataset including DEM and RGB mosaic for AB (July 13 2013) and L2 corridor (July 21 2013)

  19. ONE NEVADA LINE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ONE NEVADA LINE ONE NEVADA LINE DOE-LPO_Project-Posters_STOR-TRSM_One-Nevada-Line.pdf (323.38 KB) More Documents & Publications STEPHENTOWN SPINDLE CX-011989: Categorical Exclusion Determination CRESCENT DUNES

  20. NEVADA FIELD OFFICE PROHIBITED ARTICLES ON NEVADA NATIONAL SECURITY SITE

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NEVADA FIELD OFFICE PROHIBITED ARTICLES ON NEVADA NATIONAL SECURITY SITE PUBLIC TOURS The following items are prohibited on the Nevada National Security Site public tours. If you have any of these items on your person, please return them to your vehicle. Tour escorts are required to do random checks. * Cameras/Camcorders * Cellular phones * Bluetooth enable devices * Portable Data Storage Devices * Computers * Recording Devices * Weapons * Explosives * Pets & Animals * Ammunition * PDA,

  1. Northern Nevada Geothermal Exploration Strategy Analysis | Open...

    Open Energy Info (EERE)

    Nevada Geothermal Exploration Strategy Analysis Jump to: navigation, search OpenEI Reference LibraryAdd to library Journal Article: Northern Nevada Geothermal Exploration Strategy...

  2. Nevada Construction Stormwater Factsheet | Open Energy Information

    Open Energy Info (EERE)

    sheet for Nevada's General Storm Water Construction Permit. Author Nevada Division of Environmental Protection Published NDEP, 2007 DOI Not Provided Check for DOI availability:...

  3. Nevada National Security Site Waste Acceptance Criteria

    National Nuclear Security Administration (NNSA)

    Nevada National Security Site Waste Acceptance Criteria Prepared by U.S. Department of Energy National Nuclear Security Administration Nevada Field Office Environmental...

  4. Independent Oversight Review, Nevada National Security - May...

    Office of Environmental Management (EM)

    National Security - May 2013 Independent Oversight Review, Nevada National Security - May 2013 May 2013 Review of the Nevada National Security Site Criticality Safety Program ...

  5. Nevada National Security Site Performance Assessment Updates...

    Office of Environmental Management (EM)

    Performance Assessment Updates for New Waste Streams Nevada National Security Site ... Video Presentation Nevada National Security Site Performance Assessment Updates for New ...

  6. ,"Nevada Natural Gas Vehicle Fuel Consumption (MMcf)"

    U.S. Energy Information Administration (EIA) Indexed Site

    Data for" ,"Data 1","Nevada Natural Gas Vehicle Fuel Consumption ... 1:24:58 AM" "Back to Contents","Data 1: Nevada Natural Gas Vehicle Fuel Consumption ...

  7. Independent Oversight Review, Nevada National Security Site,...

    Broader source: Energy.gov (indexed) [DOE]

    of Federal Assurance Capability at the Nevada National Security Site This report ... systems at the Nevada National Security Site (NNSS) Device Assembly Facility (DAF). ...

  8. Nevada Department of Transportation | Open Energy Information

    Open Energy Info (EERE)

    of Transportation Name: Nevada Department of Transportation Address: 1263 S. Stewart St. Place: Carson City, Nevada Zip: 89712 Phone Number: 775-888-7000 Website:...

  9. Independent Oversight Activity Report, Nevada National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    March 3-6, 2014 Independent Oversight Activity Report, Nevada National Security Site - March 3-6, 2014 March 2014 Operational Awareness Oversight of the Nevada National Security...

  10. Sierra Nevada Geothermal Region | Open Energy Information

    Open Energy Info (EERE)

    ENERGYGeothermal Home Sierra Nevada Geothermal Region Details Areas (0) Power Plants (0) Projects (0) Techniques (0) Map: Name California's Sierra Nevada is a...

  11. Southern Nevada Health District | Open Energy Information

    Open Energy Info (EERE)

    Health District Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Southern Nevada Health District Author Southern Nevada Health District Published...

  12. Nevada Field Office | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Us Our Operations Management and Budget Office of Civil Rights Workforce Statistics Nevada Field Office Nevada Field Office FY15 Year End Report Semi Annual Report...

  13. Nevada Revised Statutes | Open Energy Information

    Open Energy Info (EERE)

    Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Nevada Revised Statutes Citation Nevada Revised Statutes (2014). Retrieved...

  14. Nevada Administrative Code | Open Energy Information

    Open Energy Info (EERE)

    Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Nevada Administrative Code Citation Nevada Administrative Code (2014)....

  15. Thermal Waters of Nevada | Open Energy Information

    Open Energy Info (EERE)

    to library Report: Thermal Waters of Nevada Abstract Abstract unavailable. Authors Larry J. Garside and John H. Schilling Organization Nevada Bureau of Mines and Geology Published...

  16. Nevada | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Nevada NNSA research makes scientific impact, literally Inside the 40-mm Impact Test Facility, a heavily instrumented gun - 40 millimeters in diameter - employs compressed helium ...

  17. Recovery Act State Memos Nevada

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    ... modernize Nevada's electricity infrastructure and ... offered a conditional commitment to provide a partial ... of a low temperature binary unit that will add to power ...

  18. 2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    SciTech Connect (OSTI)

    West, W. J.; Lucas, J. G.; Gano, K. A.

    2011-11-14

    This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractors revegetation and mitigation areas on the Hanford Site.

  19. 2010 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    SciTech Connect (OSTI)

    C. T. Lindsey, A. L. Johnson

    2010-09-30

    This report documents eh status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with CERLA cleanup of National Priorities List waste sites at Hanford. This report contains vegetation monitoring data that were collected in the spring and summer of 2010 from the River Corridor Closure Contract’s revegetation and mitigation areas on the Hanford Site.

  20. Early environmental planning: A process for power line corridor selection

    SciTech Connect (OSTI)

    Haagenstad, T.; Bare, C.M.

    1998-12-01

    Los Alamos National Laboratory (LANL) conducted an environmental planning study in the fall of 1997 to help determine the best alternative for upgrading the Laboratory`s electrical power system. Alternatives considered included an on-site power generation facility and two corridors for a 10-mile-long 115-kV power line. This planning process was conducted prior to the formal National Environmental Policy Act (NEPA) review. The goals were to help select the best proposed action, to recommend modifications and mitigation measures for each alternative for a more environmentally sound project, and to avoid potential delays once the formal Department of Energy review process began. Significant constraints existed from a planning perspective, including operational issues such as existing outdoor high explosives testing areas, as well as environmental issues including threatened and endangered species habitats, multiple archeological sites, contaminated areas, and aesthetics. The study had to be completed within 45 days to meet project schedule needs. The process resulted in a number of important recommendations. While the construction and operation of the on-site power generation facility could have minimal environmental impacts, the need for a new air quality permit would create severe cost and schedule constraints for the project. From an environmental perspective, construction and operation of a power line within either corridor was concluded to be a viable alternative. However, impacts with either corridor would have to be reduced through specific recommended alignment modifications and mitigation measures.

  1. Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council

    SciTech Connect (OSTI)

    Kuiper, James A.; Cantwell, Brian J.; Hlava, Kevin J.; Moore, H Robert; Orr, Andrew B.; Zvolanek, Emily A.

    2014-02-24

    This report, Analysis of Potential Energy Corridors Proposed by the Western Electricity Coordinating Council (WECC), was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). The intent of WECC’s work was to identify planning-level energy corridors that the Department of Energy (DOE) and its affiliates could study in greater detail. Argonne was tasked by DOE to analyze the WECC Proposed Energy Corridors in five topic areas for use in reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. In compliance with Section 368 of the Energy Policy Act of 2005 (EPAct), the Secretaries of Energy, Agriculture, and the Interior (Secretaries) published a Programmatic Environmental Impact Statement in 2008 to address the proposed designation of energy transport corridors on federal lands in the 11 western states. Subsequently, Records of Decision designating the corridors were issued in 2009 by the Bureau of Land Management (BLM) and the U.S. Forest Service (USFS). The 2012 settlement of a lawsuit, brought by The Wilderness Society and others against the United States, which identified environmental concerns for many of the corridors requires, among other things, periodic reviews of the corridors to assess the need for revisions, deletions, or additions. A 2013 Presidential Memorandum requires the Secretaries to undertake a continuing effort to identify and designate energy corridors. The WECC Proposed Energy Corridors and their analyses in this report provide key information for reviewing and revising existing corridors, as well as designating additional energy corridors in the 11 western states. Load centers and generation hubs identified in the WECC analysis, particularly as they reflect renewable energy development, would be useful in reviewing and potentially updating the designated Section 368 corridor network. Argonne used Geographic Information System (GIS) technology to

  2. Landscape corridors can increase invasion by an exotic species and reduce diversity of native species.

    SciTech Connect (OSTI)

    Resasco, Julian; et al,

    2014-04-01

    Abstract. Landscape corridors are commonly used to mitigate negative effects of habitat fragmentation, but concerns persist that they may facilitate the spread of invasive species. In a replicated landscape experiment of open habitat, we measured effects of corridors on the invasive fire ant, Solenopsis invicta, and native ants. Fire ants have two social forms: polygyne, which tend to disperse poorly but establish at high densities, and monogyne, which disperse widely but establish at lower densities. In landscapes dominated by polygyne fire ants, fire ant abundance was higher and native ant diversity was lower in habitat patches connected by corridors than in unconnected patches. Conversely, in landscapes dominated by monogyne fire ants, connectivity had no influence on fire ant abundance and native ant diversity. Polygyne fire ants dominated recently created landscapes, suggesting that these corridor effects may be transient. Our results suggest that corridors can facilitate invasion and they highlight the importance of considering species traits when assessing corridor utility.

  3. LNG Imports by Rail into the U.S. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Rail into the U.S. LNG Imports by Rail into the U.S. LNG Imports by Rail Form (Excel) (54.5 KB) LNG Imports by Rail Form (pdf) (11.21 KB) More Documents & Publications LNG Imports by Truck into the U.S. Form LNG Imports by Vessel into the U.S. Form LNG Exports by Truck

  4. Impact of commuter-rail services in Toronto region

    SciTech Connect (OSTI)

    Wells, S.S.; Hutchinson, B.G.

    1996-07-01

    Ridership of the commuter-rail system that was implemented in the Greater Toronto Area (GTA) in 1967 increased at an annual, average compound rate of 11.4% until 1989. Demand has leveled substantially during 1990--94 and has averaged only 2.1% per year, which probably reflects the suburbanization of employment. Urban economic theory is used to explain the way in which central-business-district (CBD) employees respond differently to suburban commuter-rail services and rapid transit services, mainly serving the inner intermediate suburbs. Travel data collected in 1986 and 1991 confirmed the effects suggested by the theory. Commuter-rail passengers are drawn from the larger suburban households, living principally in single-family houses, and commuter-rail passengers are more sensitive to access and egress distances than subway passengers. Policies that improve the quality of access and egress components of commuting trips from the suburbs stimulate passenger demand. Also, land-use policies that promote high-density, residential development at suburban commuter-rail stations are unlikely to contribute significantly to commuter-rail demand, and the lakeshore commuter-rail line that has been in service since 1967 has not had a significant impact on residential sorting and on the generation of additional demands.

  5. Offset-free rail-to-rail derandomizing peak detect-and-hold circuit

    DOE Patents [OSTI]

    DeGeronimo, Gianluigi; O'Connor, Paul; Kandasamy, Anand

    2003-01-01

    A peak detect-and-hold circuit eliminates errors introduced by conventional amplifiers, such as common-mode rejection and input voltage offset. The circuit includes an amplifier, three switches, a transistor, and a capacitor. During a detect-and-hold phase, a hold voltage at a non-inverting in put terminal of the amplifier tracks an input voltage signal and when a peak is reached, the transistor is switched off, thereby storing a peak voltage in the capacitor. During a readout phase, the circuit functions as a unity gain buffer, in which the voltage stored in the capacitor is provided as an output voltage. The circuit is able to sense signals rail-to-rail and can readily be modified to sense positive, negative, or peak-to-peak voltages. Derandomization may be achieved by using a plurality of peak detect-and-hold circuits electrically connected in parallel.

  6. Nevada Weatherizes Large-Scale Complex

    Broader source: Energy.gov [DOE]

    Increased energy efficiency is translating into increased productivity for one Nevada weatherization organization.

  7. Energy Secretary Moniz and Nevada Governor Sandoval Formalize...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    and Nevada Governor Sandoval Formalize Working Group to Advance Shared Interests at Nevada National Security Site Energy Secretary Moniz and Nevada Governor Sandoval Formalize...

  8. Energy Secretary Moniz and Nevada Governor Sandoval Formalize...

    Office of Environmental Management (EM)

    and Nevada Governor Sandoval Formalize Working Group to Advance Shared Interests at Nevada National Security Site Energy Secretary Moniz and Nevada Governor Sandoval Formalize ...

  9. Nye County, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Amargosa Farm Road Solar Energy Project Solar Power Plant Crescent Dunes Tonopah Airport Solar Power Plant Places in Nye County, Nevada Beatty, Nevada Gabbs, Nevada Pahrump,...

  10. First Subcritical Experiment Conducted at Nevada Test Site |...

    National Nuclear Security Administration (NNSA)

    Subcritical Experiment Conducted at Nevada Test Site First Subcritical Experiment Conducted at Nevada Test Site Nevada Test Site, NV The first "subcritical" physics experiment at ...

  11. Nevada Division of Water Resources Forms Webpage | Open Energy...

    Open Energy Info (EERE)

    library Web Site: Nevada Division of Water Resources Forms Webpage Abstract Provides access to State of Nevada Division of Water Resources forms. Author State of Nevada Division...

  12. Nevada State Air Regulations and State Implementation Plan Webpage...

    Open Energy Info (EERE)

    in Nevada and its state implementation plan. Author State of Nevada Division of Environmental Protection Published State of Nevada, Date Not Provided DOI Not Provided...

  13. NDEP - Nevada Construction Stormwater FAQs | Open Energy Information

    Open Energy Info (EERE)

    dealing with construction stormwater permits in Nevada. Author Nevada Division of Environmental Protection Published Nevada Division of Environmental Protection, 2010 DOI...

  14. RAPID/Solar/Environment/Nevada | Open Energy Information

    Open Energy Info (EERE)

    Adopted Regulation R038-11 Nevada Agreement for Delegation of Federal PSD Program Nevada Air Quality Control Permitting Guidance Webpage Nevada Air Quality Permitting Webpage...

  15. Nevada/Wind Resources/Full Version | Open Energy Information

    Open Energy Info (EERE)

    Energy Association Nevada Wind Resources NV Energy Wind Projects Nevada Governor's Office of Energy AWEA State Wind Energy Statistics: Nevada Four Corners Wind Resource Center...

  16. Nevada -- SEP Summary of Reported Data | Department of Energy

    Energy Savers [EERE]

    Summary of Reported Data Nevada -- SEP Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Nevada -- SEP. Nevada -- SEP Summary of ...

  17. EERE Success Story-Nevada Strengthens Electric Vehicle Infrastructure...

    Broader source: Energy.gov (indexed) [DOE]

    Paul Thomsen, Director of the Nevada Governors Office of Energy, announces the new Nevada Electric Highway Joint Initiative in Carson City, Nevada. He was joined at the event ...

  18. Enforcement Letter, Bechtel Nevada - February 26, 2003 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Bechtel Nevada - February 26, 2003 Enforcement Letter, Bechtel Nevada - February 26, 2003 February 26, 2003 Issued to Bechtel Nevada related to Authorization Basis Noncompliances ...

  19. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Students Set to Test Their Knowledge Nevada Regional Science Bowl is this weekend ... Answer: So you can win the Nevada Regional Science Bowl The Nevada Regional Science Bowl ...

  20. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Monitoring Report Released The Nevada National Security Site (NNSS) ... Las Vegas, NV 89119, or by request at nevada@nnsa.doe.gov. -30- Follow the NNSA Nevada ...

  1. Central Nevada Seismic Zone Geothermal Region | Open Energy Informatio...

    Open Energy Info (EERE)

    Central Nevada Seismic Zone Geothermal Region (Redirected from Central Nevada Seismic Zone) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Central Nevada Seismic Zone...

  2. Nevada Bureau of Pollution Control Webpage | Open Energy Information

    Open Energy Info (EERE)

    Site: Nevada Bureau of Pollution Control Webpage Abstract Provides information regarding air pollution control in Nevada. Author State of Nevada Division of Environmental...

  3. Project Reports for Washoe Tribe of Nevada and California - 2015...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Washoe Tribe of Nevada and California - 2015 Project Project Reports for Washoe Tribe of Nevada and California - 2015 Project Under this grant, the Washoe Tribe of Nevada and ...

  4. DOE - NNSA/NFO -- Nevada National Security Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Site NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Nevada National Security Site Photograph of NNSS A unique national resource, the Nevada National Security Site is ...

  5. DOE - NNSA/NFO -- Directions to the Nevada Field Office

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Information > Directions NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Directions to the Nevada Field Office The Department of Energy, Nevada Field Office is ...

  6. DOE - NNSA/NFO -- Photo Library Nevada National Security Site

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Library > Nevada National Security Site NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Photo Library - Nevada National Security Site A unique national resource, the ...

  7. Nevada Test And Training Range Geothermal Area | Open Energy...

    Open Energy Info (EERE)

    Nevada Test And Training Range Geothermal Area (Redirected from Nevada Test And Training Range Area) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Nevada Test And...

  8. Nevada Department of Motor Vehicles | Open Energy Information

    Open Energy Info (EERE)

    Nevada Department of Motor Vehicles Name: Nevada Department of Motor Vehicles Address: 555 Wright Way Place: Carson City, Nevada Zip: 89711 Phone Number: 702-486-4368 Website:...

  9. Radioactive Mineral Occurences in Nevada | Open Energy Information

    Open Energy Info (EERE)

    Radioactive Mineral Occurences in Nevada Abstract Abstract unavailable. Author Larry J. Garside Organization Nevada Bureau of Mines and Geology Published Nevada Bureau of...

  10. Technical Qualification Program Self-Assessment Report - Nevada...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada Field Office - 2014 Technical Qualification Program Self-Assessment Report - Nevada Field Office - 2014 This self-assessment examined how the Nevada Field Office (NFO) ...

  11. water + monitoring + Nevada + permitting | OpenEI Community

    Open Energy Info (EERE)

    + Nevada + permitting Home Kyoung's picture Submitted by Kyoung(150) Contributor 2 August, 2012 - 18:43 Nevada Meeting 2 - Regulatory Issues water + monitoring + Nevada +...

  12. Nevada Regions | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    is designated for your school's state, county, city, or district. For more information, please visit the High School Coach page. Nevada Region High School Regional Nevada Nevada...

  13. Nevada Regions | U.S. DOE Office of Science (SC)

    Office of Science (SC) Website

    designated for your school's state, county, city, or district. For more information, please visit the Middle School Coach page. Nevada Region Middle School Regional Nevada Nevada...

  14. Voluntary Protection Program Onsite Review, River Corridor Closure Project- June 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    Evaluation to determine whether River Corridor Closure Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  15. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: DWP Summary, Volume 1

    SciTech Connect (OSTI)

    Project Integration

    2005-09-26

    This detailed work plan provides the scope, cost, and schedule for the Fiscal Year 2006 activities required to support River Corridor cleanup objectives within the directed guidance.

  16. EIS-0386: Designation of Energy Corridors on Federal Land in Western States

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EIS analyzes DOE's decision to designatate corridors on Federal land in the eleven Western States for oil, gas and hydrogen pipelines and electricity transmission and distribution facilities.

  17. Robotics virtual rail system and method

    DOE Patents [OSTI]

    Bruemmer, David J.; Few, Douglas A.; Walton, Miles C.

    2011-07-05

    A virtual track or rail system and method is described for execution by a robot. A user, through a user interface, generates a desired path comprised of at least one segment representative of the virtual track for the robot. Start and end points are assigned to the desired path and velocities are also associated with each of the at least one segment of the desired path. A waypoint file is generated including positions along the virtual track representing the desired path with the positions beginning from the start point to the end point including the velocities of each of the at least one segment. The waypoint file is sent to the robot for traversing along the virtual track.

  18. STATE OF NEVADA

    Office of Legacy Management (LM)

    ' , STATE OF NEVADA / j DEPARTME T'- OF_CONSERVATION AND NATURAL I;).c-.)}"",.~ Carson City View of spring discha rge in Hot Creek Ca nyon. WATER RESOU RCES - RECON NAISSANCE SERI ES REPORT 38 ... By F. Eugene Rush Geolog ist * . , and . _ . . , J * _. * * * .~ ~ u.a lieir rFt 0 M T H I S 0 f f J C .£ ~ - _ . PL E A S E WATER-RESOURCES APPRAISAL OF LITTLE FISH LAKE, HOT CREEK, EVJu6Ho.. \ . Prepared cooperatively by the Geological Survey, U.S. Department of the Interior MAY 1966

  19. A Historical Evaluation of the U16a Tunnel, Nevada National Security Site, Nye County, Nevada Volume 2

    SciTech Connect (OSTI)

    Jones, Roberrt C; Drollinger, Harold

    2013-06-01

    This report presents a historical evaluation of the U16a Tunnel on the Nevada National Security Site in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the U.S. Department of Defense, Defense Threat Reduction Agency. The U16a Tunnel was used for underground nuclear weapons effects tests in Shoshone Mountain in Area 16 of the Nevada National Security Site. Six nuclear tests were conducted in the U16a Tunnel from 1962 to 1971. These tests are Marshmallow, Gum Drop, Double Play, Ming Vase, Diamond Dust, and Diamond Mine. The U.S. Department of Defense Threat Reduction Agency, with participation from Lawrence Livermore National Laboratory and Las Alamos National Laboratory, sponsored the tests. Fifteen high explosives tests were also conducted at the tunnel. Two were calibration tests during nuclear testing and the remaining were U.S. Department of Defense, Defense Threat Reduction Agency tunnel defeat tests. The U16a Tunnel complex is on the top and slopes of Shoshone Mountain, encompassing an area of approximately 16.7 hectares (41.1 acres). Major modifications to the landscape are a result of three principal activities, road construction and maintenance, mining activities related to development of the tunnel complex, and site preparation for activities related to testing. Forty-seven cultural features were recorded at the portal and on the slopes of Shoshone Mountain. At the portal area, features relate to the mining, construction, testing, and general every day operational support activities within the tunnel. These include concrete foundations for buildings, equipment pads, and rail lines. Features on the slopes above the tunnel relate to tunnel ventilation, borehole drilling, and data recording. Feature types include soil-covered bunkers, concrete foundations, instrument cable holes, drill holes, and ventilation shafts. The U16

  20. A Historical Evaluation of the U16a Tunnel, Nevada National Security Site, Nye County, Nevada Volume 1

    SciTech Connect (OSTI)

    Jones, robert C; Drollinger, Harold; Bullard, Thomas F; Ashbaugh, Laurence J; Griffin, Wayne R

    2013-06-01

    This report presents a historical evaluation of the U16a Tunnel on the Nevada National Security Site in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the U.S. Department of Defense, Defense Threat Reduction Agency. The U16a Tunnel was used for underground nuclear weapons effects tests in Shoshone Mountain in Area 16 of the Nevada National Security Site. Six nuclear tests were conducted in the U16a Tunnel from 1962 to 1971. These tests are Marshmallow, Gum Drop, Double Play, Ming Vase, Diamond Dust, and Diamond Mine. The U.S. Department of Defense Threat Reduction Agency, with participation from Lawrence Livermore National Laboratory and Las Alamos National Laboratory, sponsored the tests. Fifteen high explosives tests were also conducted at the tunnel. Two were calibration tests during nuclear testing and the remaining were U.S. Department of Defense, Defense Threat Reduction Agency tunnel defeat tests. The U16a Tunnel complex is on the top and slopes of Shoshone Mountain, encompassing an area of approximately 16.7 hectares (41.1 acres). Major modifications to the landscape are a result of three principal activities, road construction and maintenance, mining activities related to development of the tunnel complex, and site preparation for activities related to testing. Forty-seven cultural features were recorded at the portal and on the slopes of Shoshone Mountain. At the portal area, features relate to the mining, construction, testing, and general every day operational support activities within the tunnel. These include concrete foundations for buildings, equipment pads, and rail lines. Features on the slopes above the tunnel relate to tunnel ventilation, borehole drilling, and data recording. Feature types include soil-covered bunkers, concrete foundations, instrument cable holes, drill holes, and ventilation shafts. The U16

  1. A Historical Evaluation of the U12t Tunnel, Nevada Test Site, Nye County, Nevada, Volume 3 of 6

    SciTech Connect (OSTI)

    Harold Drollinger; Robert C. Jones; and Thomas F. Bullard; Desert Research Institute, Laurence J. Ashbaugh, Southern Nevada Courier Service and Wayne R. Griffin, Stoller-Navarro Joint Venture

    2009-02-01

    This report presents a historical evaluation of the U12t Tunnel on the Nevada Test Site in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the U.S. Department of Defense, Defense Threat Reduction Agency (DTRA). The U12t Tunnel is one of a series of tunnels used for underground nuclear weapons effects tests on the east side of Rainier and Aqueduct Mesas. Six nuclear weapons effects tests, Mint Leaf, Diamond Sculls, Husky Pup, Midas Myth/Milagro, Mighty Oak, and Mission Ghost, and one high explosive test, SPLAT, were conducted within the U12t Tunnel from 1970 to 1987. All six of the nuclear weapons effects tests and the high explosive test were sponsored by DTRA. Two conventional weapons experiments, Dipole Knight and Divine Eagle, were conducted in the tunnel portal area in 1997 and 1998. These experiments were sponsored by the Defense Special Weapons Agency. The U12t Tunnel complex is composed of the Portal and Mesa Areas and includes an underground tunnel with a main access drift and nine primary drifts, a substantial tailings pile fronting the tunnel portal, a series of discharge ponds downslope of the tailings pile, and two instrumentation trailer parks and 16 drill holes on top of Aqueduct Mesa. A total of 89 cultural features were recorded: 54 at the portal and 35 on the mesa. In the Portal Area, cultural features are mostly concrete pads and building foundations; other features include the portal, rail lines, the camel back, ventilation and cooling system components, communication equipment, and electrical equipment. On the mesa are drill holes, a few concrete pads, a loading ramp, and electrical equipment.

  2. A Historical Evaluation of the U12t Tunnel, Nevada Test Site, Nye County, Nevada, Volume 5 of 6

    SciTech Connect (OSTI)

    Harold Drollinger; Robert C. Jones; and Thomas F. Bullard; Desert Research Institute, Laurence J. Ashbaugh, Southern Nevada Courier Service and Wayne R. Griffin, Stoller-Navarro Joint Venture

    2009-02-01

    This report presents a historical evaluation of the U12t Tunnel on the Nevada Test Site in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the U.S. Department of Defense, Defense Threat Reduction Agency (DTRA). The U12t Tunnel is one of a series of tunnels used for underground nuclear weapons effects tests on the east side of Rainier and Aqueduct Mesas. Six nuclear weapons effects tests, Mint Leaf, Diamond Sculls, Husky Pup, Midas Myth/Milagro, Mighty Oak, and Mission Ghost, and one high explosive test, SPLAT, were conducted within the U12t Tunnel from 1970 to 1987. All six of the nuclear weapons effects tests and the high explosive test were sponsored by DTRA. Two conventional weapons experiments, Dipole Knight and Divine Eagle, were conducted in the tunnel portal area in 1997 and 1998. These experiments were sponsored by the Defense Special Weapons Agency. The U12t Tunnel complex is composed of the Portal and Mesa Areas and includes an underground tunnel with a main access drift and nine primary drifts, a substantial tailings pile fronting the tunnel portal, a series of discharge ponds downslope of the tailings pile, and two instrumentation trailer parks and 16 drill holes on top of Aqueduct Mesa. A total of 89 cultural features were recorded: 54 at the portal and 35 on the mesa. In the Portal Area, cultural features are mostly concrete pads and building foundations; other features include the portal, rail lines, the camel back, ventilation and cooling system components, communication equipment, and electrical equipment. On the mesa are drill holes, a few concrete pads, a loading ramp, and electrical equipment.

  3. A Historical Evaluation of the U12t Tunnel, Nevada Test Site, Nye County, Nevada, Volume 4 of 6

    SciTech Connect (OSTI)

    Harold Drollinger; Robert C. Jones; and Thomas F. Bullard; Desert Research Institute, Laurence J. Ashbaugh, Southern Nevada Courier Service and Wayne R. Griffin, Stoller-Navarro Joint Venture

    2009-02-01

    This report presents a historical evaluation of the U12t Tunnel on the Nevada Test Site in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the U.S. Department of Defense, Defense Threat Reduction Agency (DTRA). The U12t Tunnel is one of a series of tunnels used for underground nuclear weapons effects tests on the east side of Rainier and Aqueduct Mesas. Six nuclear weapons effects tests, Mint Leaf, Diamond Sculls, Husky Pup, Midas Myth/Milagro, Mighty Oak, and Mission Ghost, and one high explosive test, SPLAT, were conducted within the U12t Tunnel from 1970 to 1987. All six of the nuclear weapons effects tests and the high explosive test were sponsored by DTRA. Two conventional weapons experiments, Dipole Knight and Divine Eagle, were conducted in the tunnel portal area in 1997 and 1998. These experiments were sponsored by the Defense Special Weapons Agency. The U12t Tunnel complex is composed of the Portal and Mesa Areas and includes an underground tunnel with a main access drift and nine primary drifts, a substantial tailings pile fronting the tunnel portal, a series of discharge ponds downslope of the tailings pile, and two instrumentation trailer parks and 16 drill holes on top of Aqueduct Mesa. A total of 89 cultural features were recorded: 54 at the portal and 35 on the mesa. In the Portal Area, cultural features are mostly concrete pads and building foundations; other features include the portal, rail lines, the camel back, ventilation and cooling system components, communication equipment, and electrical equipment. On the mesa are drill holes, a few concrete pads, a loading ramp, and electrical equipment.

  4. A Historical Evaluation of the U12t Tunnel, Nevada Test Site, Nye County, Nevada, Volume 2 of 6

    SciTech Connect (OSTI)

    Harold Drollinger; Robert C. Jones; and Thomas F. Bullard; Desert Research Institute, Laurence J. Ashbaugh, Southern Nevada Courier Service and Wayne R. Griffin, Stoller-Navarro Joint Venture

    2009-02-01

    This report presents a historical evaluation of the U12t Tunnel on the Nevada Test Site in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the U.S. Department of Defense, Defense Threat Reduction Agency (DTRA). The U12t Tunnel is one of a series of tunnels used for underground nuclear weapons effects tests on the east side of Rainier and Aqueduct Mesas. Six nuclear weapons effects tests, Mint Leaf, Diamond Sculls, Husky Pup, Midas Myth/Milagro, Mighty Oak, and Mission Ghost, and one high explosive test, SPLAT, were conducted within the U12t Tunnel from 1970 to 1987. All six of the nuclear weapons effects tests and the high explosive test were sponsored by DTRA. Two conventional weapons experiments, Dipole Knight and Divine Eagle, were conducted in the tunnel portal area in 1997 and 1998. These experiments were sponsored by the Defense Special Weapons Agency. The U12t Tunnel complex is composed of the Portal and Mesa Areas and includes an underground tunnel with a main access drift and nine primary drifts, a substantial tailings pile fronting the tunnel portal, a series of discharge ponds downslope of the tailings pile, and two instrumentation trailer parks and 16 drill holes on top of Aqueduct Mesa. A total of 89 cultural features were recorded: 54 at the portal and 35 on the mesa. In the Portal Area, cultural features are mostly concrete pads and building foundations; other features include the portal, rail lines, the camel back, ventilation and cooling system components, communication equipment, and electrical equipment. On the mesa are drill holes, a few concrete pads, a loading ramp, and electrical equipment.

  5. A Historical Evaluation of the U12t Tunnel, Nevada Test Site, Nye County, Nevada, Volume 6 of 6

    SciTech Connect (OSTI)

    Harold Drollinger; Robert C. Jones; and Thomas F. Bullard; Desert Research Institute, Laurence J. Ashbaugh, Southern Nevada Courier Service and Wayne R. Griffin, Stoller-Navarro Joint Venture

    2009-02-01

    This report presents a historical evaluation of the U12t Tunnel on the Nevada Test Site in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the U.S. Department of Defense, Defense Threat Reduction Agency (DTRA). The U12t Tunnel is one of a series of tunnels used for underground nuclear weapons effects tests on the east side of Rainier and Aqueduct Mesas. Six nuclear weapons effects tests, Mint Leaf, Diamond Sculls, Husky Pup, Midas Myth/Milagro, Mighty Oak, and Mission Ghost, and one high explosive test, SPLAT, were conducted within the U12t Tunnel from 1970 to 1987. All six of the nuclear weapons effects tests and the high explosive test were sponsored by DTRA. Two conventional weapons experiments, Dipole Knight and Divine Eagle, were conducted in the tunnel portal area in 1997 and 1998. These experiments were sponsored by the Defense Special Weapons Agency. The U12t Tunnel complex is composed of the Portal and Mesa Areas and includes an underground tunnel with a main access drift and nine primary drifts, a substantial tailings pile fronting the tunnel portal, a series of discharge ponds downslope of the tailings pile, and two instrumentation trailer parks and 16 drill holes on top of Aqueduct Mesa. A total of 89 cultural features were recorded: 54 at the portal and 35 on the mesa. In the Portal Area, cultural features are mostly concrete pads and building foundations; other features include the portal, rail lines, the camel back, ventilation and cooling system components, communication equipment, and electrical equipment. On the mesa are drill holes, a few concrete pads, a loading ramp, and electrical equipment.

  6. A Historical Evaluation of the U12t Tunnel, Nevada Test Site, Nye County, Nevada, Volume 1 of 6

    SciTech Connect (OSTI)

    Harold Drollinger; Robert C. Jones; and Thomas F. Bullard; Desert Research Institute, Laurence J. Ashbaugh, Southern Nevada Courier Service and Wayne R. Griffin, Stoller-Navarro Joint Venture

    2009-02-01

    This report presents a historical evaluation of the U12t Tunnel on the Nevada Test Site in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the U.S. Department of Defense, Defense Threat Reduction Agency (DTRA). The U12t Tunnel is one of a series of tunnels used for underground nuclear weapons effects tests on the east side of Rainier and Aqueduct Mesas. Six nuclear weapons effects tests, Mint Leaf, Diamond Sculls, Husky Pup, Midas Myth/Milagro, Mighty Oak, and Mission Ghost, and one high explosive test, SPLAT, were conducted within the U12t Tunnel from 1970 to 1987. All six of the nuclear weapons effects tests and the high explosive test were sponsored by DTRA. Two conventional weapons experiments, Dipole Knight and Divine Eagle, were conducted in the tunnel portal area in 1997 and 1998. These experiments were sponsored by the Defense Special Weapons Agency. The U12t Tunnel complex is composed of the Portal and Mesa Areas and includes an underground tunnel with a main access drift and nine primary drifts, a substantial tailings pile fronting the tunnel portal, a series of discharge ponds downslope of the tailings pile, and two instrumentation trailer parks and 16 drill holes on top of Aqueduct Mesa. A total of 89 cultural features were recorded: 54 at the portal and 35 on the mesa. In the Portal Area, cultural features are mostly concrete pads and building foundations; other features include the portal, rail lines, the camel back, ventilation and cooling system components, communication equipment, and electrical equipment. On the mesa are drill holes, a few concrete pads, a loading ramp, and electrical equipment.

  7. Proposed Work Scope for the Rail Topic Group

    Office of Environmental Management (EM)

    (TEC) Working Group's Rail Topic Group (RTG) is to provide stakeholder perspectives and ... or as necessary, reporting back to the full RTG on the bimonthly calls and at meetings. ...

  8. Rail Coal Transportation Rates to the Electric Power Sector

    Gasoline and Diesel Fuel Update (EIA)

    modes, the Coal Waybill Data is based only on rail shipments. Due to the different nature of the data sources, users should exercise caution when attempting to combine the two...

  9. Impacts of Rail Pressure and Biodiesel Composition on Soot Nanostructure

    Broader source: Energy.gov [DOE]

    Fractal dimensions of particle aggregates and the fringe lengths and fringe tortuosity within the primary soot particles has been assessed as functions of load, rail pressure, and biodiesel content.

  10. Microsoft PowerPoint - Rail_Kneitel [Compatibility Mode

    Office of Environmental Management (EM)

    Super Sacks * Sometimes waste is loaded into Super Sacks (IP-1 Packages) * Then the sacks are loaded into a railcar with a crane. 5162014 5 9 What do we ship by rail? * Waste ...

  11. Coal-by-Rail Business-as-Usual Reference Case

    Broader source: Energy.gov [DOE]

    As proposed carbon emission standards reduce domestic coal use, the role of coal in the U.S. energy mix may be expected to decline. If such a decline were to occur, how would it affect rail traffic? Today, coal represents a major share of rail tonnage and gross revenue. While growth in other traffic―most notably, crude oil―may offset some of any potential decline in coal shipments, would it be sufficient? This paper explores trends in coal production volumes and use, rail tonnage and revenue, and the distribution of traffic origins and destinations in order to consider the impact of potential changes in future coal traffic. Rather than modeling discrete flows, it draws on historical data and forecasts maintained by the U.S. Department of Energy’s Energy Information Administration (EIA), industry studies and analyses, and background knowledge of the rail industry, specific routes and service territories, and commodity-level traffic volumes.

  12. Privatization contractor transfer/feed line corridor obstructions

    SciTech Connect (OSTI)

    Parazin, R.J.

    1998-05-20

    One of the issues that came out of the Tank Waste Remediation System (TWRS) Privatization Interface Control Document (ICD) effort was the need to identify below grade obstructions that exist where the TWRS Privatization Phase 1 transfer/feed corridors pass through the former Grout complex (ICD Issue 9C). Due to the numerous phases of construction at the complex, and the lack of consolidated facility configuration drawings, as-built (or as-recorded) information on the area is difficult to find, let alone decipher. To resolve the issue, this study was commissioned to identify and consolidate the as-recorded information available (drawings and Engineering Change Notices, ECNS).

  13. The Environmental Injector: Beyond Common Rail and Hydraulic

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Intensificatiion | Department of Energy The Environmental Injector: Beyond Common Rail and Hydraulic Intensificatiion The Environmental Injector: Beyond Common Rail and Hydraulic Intensificatiion The Environmental Injector System increases injection pressure, reduces parasitic losses, allows for a wide range of alternative fuels, reduces costs, and improves safety. deer08_vollmer.pdf (233.3 KB) More Documents & Publications Preparation, Injection and Combustion of Supercritical Fluids

  14. Hydrogen Assisted Diesel Combustion in a Common Rail Turbodiesel Engine |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Assisted Diesel Combustion in a Common Rail Turbodiesel Engine Hydrogen Assisted Diesel Combustion in a Common Rail Turbodiesel Engine This study measured the effects of hydrogen substitution on engine performance and reducing NOx emissions in a diesel engine deer09_boehman.pdf (150.76 KB) More Documents & Publications Particulate Produced from Advanced Combustion Operation in a Compression Ignition Engine Advanced Diesel Combustion with Low Hydrocarbon and Carbon

  15. CERCLA Preliminary Assessment of DOE'S Nevada Operations Office...

    Office of Legacy Management (LM)

    VOLUME I I. INTRODUCTION 1.1 11. NEVADA TEST SITE TESTING AREAS 2.1 Frenchman Flat ... OFF-SITE AREAS 3.1 Tonopah Test Range, Nevada 3.2 Central Nevada Test Area, Nevada 3.3 ...

  16. Low-altitude remote sensing dataset of DEM and RGB mosaic for AB corridor on July 13 2013 and L2 corridor on July 21 2013

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Baptiste Dafflon

    2015-04-07

    Low-altitude remote sensing dataset including DEM and RGB mosaic for AB (July 13 2013) and L2 corridor (July 21 2013).Processing flowchart for each corridor:Ground control points (GCP, 20.3 cm square white targets, every 20 m) surveyed with RTK GPS. Acquisition of RGB pictures using a Kite-based platform. Structure from Motion based reconstruction using hundreds of pictures and GCP coordinates. Export of DEM and RGB mosaic in geotiff format (NAD 83, 2012 geoid, UTM zone 4 north) with pixel resolution of about 2 cm, and x,y,z accuracy in centimeter range (less than 10 cm). High-accuracy and high-resolution inside GCPs zone for L2 corridor (500x20m), AB corridor (500x40) DEM will be updated once all GCPs will be measured. Only zones between GCPs are accurate although all the mosaic is provided.

  17. DOE Announces Additional Public Comment Meetings for Draft National Corridor Designations

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) today announced that it will hold four additional public meetings for the two draft National Interest Electric Transmission Corridors (National Corridors) during the 60-day public comment period, which will close on July 6, 2007.

  18. Status of Energy in Nevada

    National Nuclear Security Administration (NNSA)

    ... proposed to build a 1,500 MW coal-fired power plant (2, 750 MW units) located ... The Nevada Division of Environmental Protection (NDEP) released a draft air quality permit ...

  19. Nevada Smart Meter Program Launches

    Office of Energy Efficiency and Renewable Energy (EERE)

    A new massive smart grid project in Nevada aimed at helping residents manage their energy use will save millions in operation costs -- savings passed on to consumers -- and create hundreds of jobs along the way.

  20. ORNL Trusted Corridors Project: Watts Bar Dam Inland Waterway Project

    SciTech Connect (OSTI)

    Walker, Randy M; Gross, Ian G; Smith, Cyrus M; Hill, David E

    2011-11-01

    Radiation has existed everywhere in the environment since the Earth's formation - in rocks, soil, water, and plants. The mining and processing of naturally occurring radioactive materials for use in medicine, power generation, consumer products, and industry inevitably generate emissions and waste. Radiological measuring devices have been used by industry for years to measure for radiation in undesired locations or simply identify radioactive materials. Since the terrorist attacks on the United States on 9-11-01 these radiation measuring devices have proliferated in many places in our nation's commerce system. DOE, TVA, the Army Corps and ORNL collaborated to test the usefulness of these devices in our nation's waterway system on this project. The purpose of the Watts Bar Dam ORNL Trusted Corridors project was to investigate the security, safety and enforcement needs of local, state and federal government entities for state-of-the-art sensor monitoring in regards to illegal cargo including utilization of the existing infrastructure. TVA's inland waterways lock system is a recognized and accepted infrastructure by the commercial carrier industry. Safety Monitoring activities included tow boat operators, commercial barges and vessels, recreational watercraft and their cargo, identification of unsafe vessels and carriers, and, monitoring of domestic and foreign commercial vessels and cargo identification. Safety Enforcement activities included cargo safety, tracking, identification of hazardous materials, waterway safety regulations, and hazardous materials regulations. Homeland Security and Law Enforcement Applications included Radiological Dispersive Devices (RDD) identification, identification of unsafe or illicit transport of hazardous materials including chemicals and radiological materials, and screening for shipments of illicit drugs. In the Fall of 2005 the SensorNet funding for the project expired. After several unsuccessful attempts to find a Federal sponsor

  1. Beowawe, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    This article is a stub. You can help OpenEI by expanding it. Beowawe is a city in Eureka County, Nevada. Energy Generation Facilities in Beowawe, Nevada Beowawe Geothermal...

  2. Wabuska, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    article is a stub. You can help OpenEI by expanding it. Wabuska is a populated place in Lyon County, Nevada. Energy Generation Facilities in Wabuska, Nevada Wabuska Geothermal...

  3. Fernley, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Map This article is a stub. You can help OpenEI by expanding it. Fernley is a city in Lyon County, Nevada. It falls under Nevada's 2nd congressional district.12 Registered...

  4. Strategy for the Identification of an INL Comprehensive Utility Corridor

    SciTech Connect (OSTI)

    John Reisenauer

    2011-05-01

    This report documents the strategy developed to identify a comprehensive utility corridor (CUC) on the Idaho National Laboratory (INL) Site. The strategy established the process for which the Campus Development Office will evaluate land management issues. It is a process that uses geographical information system geospatial technology to layer critical INL mission information in a way that thorough evaluations can be conducted and strategies developed. The objective of the CUC Project was to develop a process that could be implemented to identify potential utility corridor options for consideration. The process had to take into account all the missions occurring on the INL and other land-related issues. The process for developing a CUC strategy consists of the following four basic elements using geographical information system capabilities: 1. Development of an INL base layer map; this base layer map geospatially references all stationary geographical features on INL and sitewide information. 2. Development of current and future mission land-use need maps; this involved working with each directorate to identify current mission land use needs and future land use needs that project 30 years into the future. 3. Development of restricted and potential constraint maps; this included geospatially mapping areas such as wells, contaminated areas, firing ranges, cultural areas, ecological areas, hunting areas, easement, and grazing areas. 4. Development of state highway and power line rights of way map; this included geospatially mapping rights-of-way along existing state highways and power lines running through the INL that support INL operations. It was determined after completing and evaluating the geospatial information that the area with the least impact to INL missions was around the perimeter of the INL Site. Option 1, in this document, identifies this perimeter; however, it does not mean the entire perimeter is viable. Many places along the perimeter corridor cannot

  5. Nevada Working Group (JOWOG 32 HDT)

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LaboratoryNevada Working Group Meeting (JOWOG 32 HDT) Radiographs Nevada Working Group Meeting (JOWOG 32 HDT) 11-13 April 2016, Los Alamos National Laboratory The Nevada Working group meeting (NVWG) brings together the teams working jointly in subcritical experiments at the Nevada test site. NVWG meeting will be starting on Monday morning through lunchtime Wednesday, 11-13 April 2016 at Los Alamos National Laboratory and it is hosted under the auspices of JOWOG 32 HDT. This workshop will be

  6. Coal-by-Rail: A Business-as-Usual Reference Case | Argonne National...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Coal-by-Rail: A Business-as-Usual Reference Case Title Coal-by-Rail: A Business-as-Usual Reference Case Publication Type Report Year of Publication 2015 Authors Mintz, MM, Saricks,...

  7. Crude Oil Movements of Crude of by Rail between PAD Districts

    U.S. Energy Information Administration (EIA) Indexed Site

    2010 2011 2012 2013 2014 2015 View History From PADD 1 to PADD 2 0 0 0 0 0 0 2010-2015 ... See movements of crude oil by rail for movements by rail within PADDs and tofrom Canada. ...

  8. Nevada -- SEP Data Dashboard | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Data Dashboard Nevada -- SEP Data Dashboard The data dashboard for Nevada -- SEP, a partner in the Better Buildings Neighborhood Program. Nevada -- SEP Data Dashboard (300.91 KB) More Documents & Publications Energize New York Data Dashboard Massachusetts -- SEP Data Dashboard Phoenix, Arizona Data Dashboard

  9. Nevada Test Site Waste Acceptance Criteria (NTSWAC)

    SciTech Connect (OSTI)

    NNSA /NSO Waste Management Project

    2008-06-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, Nevada Test Site Waste Acceptance Criteria (NTSWAC). The NTSWAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive (LLW) and LLW Mixed Waste (MW) for disposal.

  10. Turbine blade squealer tip rail with fence members

    DOE Patents [OSTI]

    Little, David A

    2012-11-20

    A turbine blade includes an airfoil, a blade tip section, a squealer tip rail, and a plurality of chordally spaced fence members. The blade tip section includes a blade tip floor located at an end of the airfoil distal from the root. The blade tip floor includes a pressure side and a suction side joined together at chordally spaced apart leading and trailing edges of the airfoil. The squealer tip rail extends radially outwardly from the blade tip floor adjacent to the suction side and extends from a first location adjacent to the airfoil trailing edge to a second location adjacent to the airfoil leading edge. The fence members are located between the airfoil leading and trailing edges and extend radially outwardly from the blade tip floor and axially from the squealer tip rail toward the pressure side.

  11. U.S. Energy-by-Rail Data Methodology

    U.S. Energy Information Administration (EIA) Indexed Site

    by-Rail Data Methodology June 2016 Independent Statistics & Analysis www.eia.gov U.S. Department of Energy Washington, DC 20585 U.S. Energy Information Administration | U.S. Energy-by-Rail Data Methodology i This report was prepared by the U.S. Energy Information Administration (EIA), the statistical and analytical agency within the U.S. Department of Energy. By law, EIA's data, analyses, and forecasts are independent of approval by any other officer or employee of the United States

  12. USED FUEL RAIL SHOCK AND VIBRATION TESTING OPTIONS ANALYSIS

    SciTech Connect (OSTI)

    Ross, Steven B.; Best, Ralph E.; Klymyshyn, Nicholas A.; Jensen, Philip J.; Maheras, Steven J.

    2014-09-29

    The objective of the rail shock and vibration tests is to complete the framework needed to quantify loads of fuel assembly components that are necessary to guide materials research and establish a technical basis for review organizations such as the U.S. Nuclear Regulatory Commission (NRC). A significant body of experimental and numerical modeling data exists to quantify loads and failure limits applicable to normal conditions of transport (NCT) rail transport, but the data are based on assumptions that can only be verified through experimental testing. The test options presented in this report represent possible paths for acquiring the data that are needed to confirm the assumptions of previous work, validate modeling methods that will be needed for evaluating transported fuel on a case-by-case basis, and inform material test campaigns on the anticipated range of fuel loading. The ultimate goal of this testing is to close all of the existing knowledge gaps related to the loading of used fuel under NCT conditions and inform the experiments and analysis program on specific endpoints for their research. The options include tests that would use an actual railcar, surrogate assemblies, and real or simulated rail transportation casks. The railcar carrying the cradle, cask, and surrogate fuel assembly payload would be moved in a train operating over rail track modified or selected to impart shock and vibration forces that occur during normal rail transportation. Computer modeling would be used to help design surrogates that may be needed for a rail cask, a cask’s internal basket, and a transport cradle. The objective of the design of surrogate components would be to provide a test platform that effectively simulates responses to rail shock and vibration loads that would be exhibited by state-of-the-art rail cask, basket, and/or cradle structures. The computer models would also be used to help determine the placement of instrumentation (accelerometers and strain gauges

  13. Department of Energy Seeks Public Comment on Designation of Energy Corridors in the West

    Broader source: Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announced that it and several other federal agencies will host eleven public meetings to discuss the designation of multi-purpose energy corridors on federal lands in the western United States.

  14. I-65, America's First BioFuels Corridor: Timeline and Map

    Office of Energy Efficiency and Renewable Energy (EERE)

    At the May 1, 2008 joint quarterly Web conference of DOE's Biomass and Clean Cities programs, Julie Howe (Indiana Office of Energy & Defense Development) described the I-65 Corridor Project.

  15. Department of Energy Awards Hanford River Corridor Contract To Washington Closure, LLC

    Broader source: Energy.gov [DOE]

    WASHINGTON, DC U.S. Energy Secretary Samuel Bodman today announced that Washington Closure, LLC has been awarded the contract to manage the clean up and remediation of the Columbia River Corridor...

  16. From: Carl Daffron To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Carl Daffron To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors Date: Monday, September 22, 2014 12:47:15 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undue burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. Second, I believe that

  17. From: Carol Johnson To: Congestion Study Comments Subject: Re: National Interest Energy Transmission Corridors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Johnson To: Congestion Study Comments Subject: Re: National Interest Energy Transmission Corridors Date: Sunday, October 19, 2014 8:20:41 AM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undo burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. I am a landowner in the path

  18. From: Noralie Crow To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors (NIETC)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Noralie Crow To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors (NIETC) Date: Monday, September 22, 2014 6:50:56 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undo burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. Second, I believe

  19. EIS-0406: Designation of Energy Corridors on Federal Land in 39 States

    Broader source: Energy.gov [DOE]

    DOE has canceled this EIS, which was to evaluate the environmental impacts of the designation, under Section 368(b) of the Energy Policy Act of 2005, of energy corridors on federal lands in 39 nonwestern states. The corridors, which were to be jointly identified by the Secretaries of Agriculture, Commerce, Defense, Energy, and the Interior, might have been used for oil, gas, and hydrogen pipelines and electricity transmission and distribution facilities.

  20. Microsoft PowerPoint - Columbia_River_Corridor_Rev_2_v2.ppt [Compatibility Mode]

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    9 Columbia River Corridor The Columbia River Corridor projects selected for Recovery A t f di i l d d li hi f iliti di ti Act funding include demolishing facilities, remediating waste sites, and containing and treating contamination in groundwater. The projects support completing cleanup along the Columbia River and shrinking the active area of cleanup to the center of the Hanford Site (the Central Plateau) by 2015 1 of the Hanford Site (the Central Plateau) by 2015. May 2009 Shrinking the

  1. Microsoft Word - Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    FOR IMMEDIATE RELEASE: Jill Moran, BLM (202) 452-5068 Wednesday, November 26, 2008 Bethany Shively, DOE (202) 586-4940 Joe Walsh, USFS (202) 205-1134 Agencies Publish Final Environmental Impact Statement on Energy Corridor Designation in the West WASHINGTON, DC - Four Federal agencies today released a Final Programmatic Environmental Impact Statement (Final PEIS) proposing to designate more than 6,000 miles of energy transport corridors on Federal lands in 11 Western States. The Department of

  2. Rail assembly for use in a radioactive environment

    DOE Patents [OSTI]

    Watts, Ralph E.

    1989-01-01

    An improved rail assembly and method of construction thereof is disclosed herein that is particularly adapted for use with a crane trolley in a hot cell environment which is exposed to airborne and liquidborne radioactive contaminants. The rail assembly is generally comprised of a support wall having an elongated, rail-housing recess having a floor, side wall and ceiling. The floor of the recess is defined at least in part by the load-bearing surface of a rail, and is substantially flat, level and crevice-free to facilitate the drainage of liquids out of the recess. The ceiling of the recess overhangs and thereby captures trolley wheels within the recess to prevent them from becoming dislodged from the recess during a seismic disturbance. Finally, the interior of the recess includes a power track having a slot for receiving a sliding electrical connector from the crane trolley. The power track is mounted in an upper corner of the recess with its connector-receiving groove oriented downwardly to facilitate the drainage of liquidborne contaminants and to discourage the collection of airborne contaminants within the track.

  3. Welcome to the Nevada Field Office | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) fieldoffices Welcome to the Nevada Field Office Welcome to the Nevada Field Office The Nevada Field Office's website is currently at http://www.nv.energy.gov/main.aspx.

  4. CERCLA Preliminary Assessment of DOE'S Nevada Operations Office...

    Office of Legacy Management (LM)

    VOLUME I I. INTRODUCTION 1.1 11. NEVADA TEST SITE TESTING AREAS 2.1 Frenchman Flat ... VOLUME II 111. OFF-SITE AREAS 3.1 Tonopah Test Range, Nevada 3.2 Central Nevada Test ...

  5. Nevada Division of State Lands | Open Energy Information

    Open Energy Info (EERE)

    State Lands Jump to: navigation, search Logo: Nevada Division of State Lands Name: Nevada Division of State Lands Address: 901 S. Stewart St., Suite 5003 Place: Carson City, Nevada...

  6. Nevada State Office of Energy | Open Energy Information

    Open Energy Info (EERE)

    Energy Jump to: navigation, search Logo: Nevada State Office of Energy Name: Nevada State Office of Energy Address: 755 North Roop St., Suite 202 Place: Carson City, Nevada Zip:...

  7. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    pistondc@nv.doe.gov World's Record Tower Demolition Set in Southern Nevada LAS VEGAS, NEVADA - A world's record was set today at the Nevada National Security Site (NNSS), ...

  8. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevada Field Office News News Media Contact: For Immediate Release: Darwin J. Morgan, ... 702-295-3521 Kelly.Snyder@nnsa.doe.gov Nevada Middle School Students Ready for Nevada ...

  9. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevada Field Office News News Media Contact: For Immediate Release: Darwin J. Morgan, ...y.snyder@nnsa.doe.gov DAVIDSON ACADEMY OF NEVADA WINS 2016 NEVADA SCIENCE BOWL Dozens of ...

  10. From: Austin Bird To: Congestion Study Comments Subject: Citizen Comment: National Interest Energy Transmission Corridors (NIETC"s)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Austin Bird To: Congestion Study Comments Subject: Citizen Comment: National Interest Energy Transmission Corridors (NIETC"s) Date: Monday, October 06, 2014 10:00:01 AM To Whomever It May Concern; I am writing in support of the establishment of National Interest Energy Transmission Corridors (NIETCs). The establishment of these corridors would further the progress of the budding alternative energy sector in the Midwest, particularly in my state, Iowa. I am a resident of Davenport, Iowa, and

  11. Voluntary Protection Program Onsite Review, Centerra-Nevada - May 2015 |

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Department of Energy Centerra-Nevada - May 2015 Voluntary Protection Program Onsite Review, Centerra-Nevada - May 2015 May 2015 Recertification of Centerra-Nevada as a Conditional Star Participant in the Department of Energy Voluntary Protection Program. This report summarizes the results from the evaluation of Centerra-Nevada at the Nevada Nuclear Security Site, Las Vegas, Nevada, during the period of May 12-21, 2015, and provides the Associate Under Secretary for AU with the necessary

  12. ex parte memo - McKinsey & Company; February 16, 2011 | Department of

    Broader source: Energy.gov (indexed) [DOE]

    13.69 MB) More Documents & Publications Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain, Nye County, Nevada - Nevada Rail Transportation CorridorDOE/EIS-0250F-S2andFinal Envir EIS-0250-S2 and EIS-0369: Final Supplemental Environmental Impact Statement Final Supplemental Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and

  13. University of Nevada (UNLV): Las Vegas, Nevada (Data)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Stoffel, T.; Andreas, A.

    2006-03-18

    A partnership with the University of Nevada and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

  14. Nevada Power: Clark Station; Las Vegas, Nevada (Data)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Stoffel, T.; Andreas, A.

    2006-03-27

    A partnership with the University of Nevada and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

  15. University of Nevada (UNLV): Las Vegas, Nevada (Data)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Stoffel, T.; Andreas, A.

    A partnership with the University of Nevada and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

  16. Nevada Power: Clark Station; Las Vegas, Nevada (Data)

    DOE Data Explorer [Office of Scientific and Technical Information (OSTI)]

    Stoffel, T.; Andreas, A.

    A partnership with the University of Nevada and U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to collect solar data to support future solar power generation in the United States. The measurement station monitors global horizontal, direct normal, and diffuse horizontal irradiance to define the amount of solar energy that hits this particular location. The solar measurement instrumentation is also accompanied by meteorological monitoring equipment to provide scientists with a complete picture of the solar power possibilities.

  17. Assessment of Critical Events Corridors through Multivariate Cascading Outages Analysis

    SciTech Connect (OSTI)

    Makarov, Yuri V.; Samaan, Nader A.; Diao, Ruisheng; Kumbale, Murali; Chen, Yousu; Singh, Ruchi; Green, Irina; Morgan, Mark P.

    2011-10-17

    Massive blackouts of electrical power systems in North America over the past decade has focused increasing attention upon ways to identify and simulate network events that may potentially lead to widespread network collapse. This paper summarizes a method to simulate power-system vulnerability to cascading failures to a supplied set of initiating events synonymously termed as Extreme Events. The implemented simulation method is currently confined to simulating steady state power-system response to a set of extreme events. The outlined method of simulation is meant to augment and provide a new insight into bulk power transmission network planning that at present remains mainly confined to maintaining power system security for single and double component outages under a number of projected future network operating conditions. Although one of the aims of this paper is to demonstrate the feasibility of simulating network vulnerability to cascading outages, a more important goal has been to determine vulnerable parts of the network that may potentially be strengthened in practice so as to mitigate system susceptibility to cascading failures. This paper proposes to demonstrate a systematic approach to analyze extreme events and identify vulnerable system elements that may be contributing to cascading outages. The hypothesis of critical events corridors is proposed to represent repeating sequential outages that can occur in the system for multiple initiating events. The new concept helps to identify system reinforcements that planners could engineer in order to 'break' the critical events sequences and therefore lessen the likelihood of cascading outages. This hypothesis has been successfully validated with a California power system model.

  18. Categorical Exclusion Determinations: Nevada | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada Categorical Exclusion Determinations: Nevada Location Categorical Exclusion Determinations issued for actions in Nevada. DOCUMENTS AVAILABLE FOR DOWNLOAD April 4, 2016 CX-100588 Categorical Exclusion Determination Fleet Services EV Charging Station, Grant Sawyer State Office Bldg Award Number: DE-EE0006992 CX(s) Applied: B5.23 Weatherization and Intergovernmental Programs Office Date: 04/04/2016 Location(s): NV Office(s): Golden Field Office March 31, 2016 CX-100599 Categorical Exclusion

  19. Nevada's State Park System Strengthens Attractions with Solar...

    Office of Environmental Management (EM)

    Nevada's State Park System Strengthens Attractions with Solar Nevada's State Park System Strengthens Attractions with Solar December 21, 2015 - 4:43pm Addthis State Energy Program ...

  20. University of Nevada Las Vegas Research Foundation UNLVRF | Open...

    Open Energy Info (EERE)

    Vegas Research Foundation UNLVRF Jump to: navigation, search Name: University of Nevada Las Vegas Research Foundation (UNLVRF) Place: Nevada Zip: 89154 2036 Product: Non-profit...

  1. Douglas County, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Zone Subtype B. Registered Energy Companies in Douglas County, Nevada Bently Biofuels SEDA Sustainable Energy Development Associates LLC Places in Douglas County, Nevada...

  2. Settlement Agreement on TRU Mixed Waste Storage at Nevada Test...

    Office of Environmental Management (EM)

    Settlement Agreement for Transuranic (TRU) Mixed Waste Storage Issues at the Nevada Test Site (NTS) State Nevada Agreement Type Settlement Agreement Legal Driver(s) RCRA Scope ...

  3. Nevada Fish & Wildlife Habitat Conservation Plans | Open Energy...

    Open Energy Info (EERE)

    Nevada Fish & Wildlife Habitat Conservation Plans Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Nevada Fish & Wildlife Habitat Conservation Plans...

  4. Nevada Department of Wildlife Energy Planning and Conservation...

    Open Energy Info (EERE)

    Nevada Department of Wildlife Energy Planning and Conservation Fund Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Nevada Department of...

  5. EA-1849: Ormat Nevada Geothermal Projects in Northern NV | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 22, 2011 EA-1849: Final Environmental Assessment Tuscarora Geothermal Power Plant, ... Ormat Nevada Northern Nevada Geothermal Power Plant Projects: Loan Guarantee for ORMAT ...

  6. Audit of Electrical System Construction Projects at the Nevada...

    Energy Savers [EERE]

    ELECTRICAL SYSTEM CONSTRUCTION PROJECTS AT THE NEVADA OPERATIONS OFFICE The Office of ... 87185 AUDIT OF ELECTRICAL SYSTEM CONSTRUCTION PROJECTS AT THE NEVADA OPERATIONS ...

  7. Disposal Practices at the Nevada Test Site 2008 | Department...

    Energy Savers [EERE]

    Disposal Practices at the Nevada Test Site 2008 Disposal Practices at the Nevada Test Site 2008 Full Document and Summary Versions are available for download Disposal Practices at ...

  8. Nevada National Security Site Underground Test Area (UGTA) Flow...

    Office of Environmental Management (EM)

    Nevada National Security Site Underground Test Area (UGTA) Flow and Transport Modeling - ... Video Presentation Nevada National Security Site Underground Test Area (UGTA) Flow and ...

  9. Nevada National Security Site Underground Test Area (UGTA) Tour...

    Office of Environmental Management (EM)

    Tour Nevada National Security Site Underground Test Area (UGTA) Tour Tour Booklet from the Nevada National Security Site Underground Test Area (UGTA) Tour on December 10, 2014 at ...

  10. Audit of Subsidized Ancillary Services at the Nevada Test Site...

    Office of Environmental Management (EM)

    AUDIT OF SUBSIDIZED ANCILLARY SERVICES AT THE NEVADA TEST SITE The Office of Inspector ... ANCILLARY SERVICES AT THE NEVADA TEST SITE TABLE OF CONTENTS Page SUMMARY ...

  11. Corrective Action Investigation Plan for the Central Nevada Test...

    Office of Legacy Management (LM)

    CORRECTIVE ACTION INVESTIGATION PLAN FOR THE CENTRAL NEVADA TEST AREA SUBSURFACE SITES ... CORRECTIVE ACTION INVESTIGATION PLAN FOR THE CENTRAL NEVADA TEST AREA SUBSURFACE SITES ...

  12. FIELD INVESTIGATION AT THE FAULTLESS SITE CENTRAL NEVADA TEST

    Office of Legacy Management (LM)

    FIELD INVESTIGATION AT THE FAULTLESS SITE CENTRAL NEVADA TEST AREA DOEINV10845--T3 DE93 ... at the Faultless Site Central Nevada Test Area An evaluation of groundwater ...

  13. Washoe Tribe of Nevada and California – 2015 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Washoe Tribe of Nevada and California will install seven ground-mounted solar photovoltaic (PV) arrays throughout its three communities in Nevada, covering approximately two acres cumulatively.

  14. Enterprise Assessments Review of the Nevada National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    the Nevada National Security Site Fire Protection Program - October 2015 Enterprise Assessments Review of the Nevada National Security Site Fire Protection Program - October 2015...

  15. Nevada Meeting #2 - Regulatory Issues | OpenEI Community

    Open Energy Info (EERE)

    Nevada Meeting 2 - Regulatory Issues Home > Blogs > Kyoung's blog Kyoung's picture Submitted by Kyoung(150) Contributor 2 August, 2012 - 18:43 water + monitoring + Nevada +...

  16. Nevada Application for Permit to Appropriate Water | Open Energy...

    Open Energy Info (EERE)

    Nevada Application for Permit to Appropriate Water Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Nevada Application for Permit to Appropriate Water...

  17. Nevada State Historic Preservation Office | Open Energy Information

    Open Energy Info (EERE)

    Office Jump to: navigation, search Logo: Nevada State Historic Preservation Office Name: Nevada State Historic Preservation Office Address: 901 S. Stewart St. Place: Carson City,...

  18. 2013 Annual Planning Summary for the Nevada Site Office | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada Site Office 2013 Annual Planning Summary for the Nevada Site Office The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 ...

  19. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Nevada Site Specific Advisory Board (NSSAB) is comprised of rural and urban southern Nevada residents who provide recommendations to the U.S. Department of Energy (DOE), ...

  20. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Nevada Site Specific Advisory Board (NSSAB) is comprised of rural and urban southern Nevada residents who provide recommendations to the U.S. DOE, Environmental Management ...

  1. 2014 Annual Workforce Analysis and Staffing Plan Report - Nevada...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada Field Office 2014 Annual Workforce Analysis and Staffing Plan Report - Nevada Field Office Managers perform an annual workforce analysis of their organization and develop ...

  2. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Administration Nevada Site Office is extending the public comment period for the Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security ...

  3. Nevada Office News News Media Contact: For Immediate Release...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevada Office News News Media Contact: For Immediate Release: Darwin J. Morgan, ... to Meet A public meeting hosted by the Nevada Site Specific Advisory Board (NSSAB) will ...

  4. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Education + Creativity Speed The Nevada Regional Science Bowl Middle School Car ... The Nevada Regional Science Bowl Middle School Car Races feature student built and ...

  5. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Lutheran Middle School finished atop the Nevada Regional Science Bowl for Middle Schools. ... (ATech) in Las Vegas won the Nevada Regional Science Bowl for High Schools last month. ...

  6. National Geothermal Academy Underway at University of Nevada...

    Office of Environmental Management (EM)

    Geothermal Academy Underway at University of Nevada, Reno National Geothermal Academy Underway at University of Nevada, Reno July 11, 2012 - 2:13pm Addthis The National Geothermal ...

  7. Voluntary Protection Program Onsite Review, Nevada National Security...

    Broader source: Energy.gov (indexed) [DOE]

    February 2012 Evaluation to determine whether the Nevada National Security Sites is ... Voluntary Protection Program Onsite Review, Nevada National Security Sites - February 2012 ...

  8. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    The Nevada Site Specific Advisory Board (NSSAB) is comprised of rural and urban southern Nevada residents who provide recommendations to the U.S. Department of Energy Environmental ...

  9. Audit of the Contractor Incentive Program at the Nevada Operations...

    Office of Environmental Management (EM)

    the Contractor Incentive Program at the Nevada Operations Office, IG-0412 Audit of the Contractor Incentive Program at the Nevada Operations Office, IG-0412 Audit of the Contractor ...

  10. Nevada Site Specific Advisory Board Tackles New Work Plans, Looks...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Specific Advisory Board Tackles New Work Plans, Looks to Future Nevada Site Specific ... groundwater characterization elements during a tour of the Nevada National Security Site. ...

  11. 2015 Annual Workforce Analysis and Staffing Plan Report - Nevada...

    Office of Environmental Management (EM)

    Nevada Field Office 2015 Annual Workforce Analysis and Staffing Plan Report - Nevada Field Office Managers perform an annual workforce analysis of their organization and develop ...

  12. NNSA Begins New Campaign of Verification Experiments at Nevada...

    National Nuclear Security Administration (NNSA)

    NNSA Begins New Campaign of Verification Experiments at Nevada National Security Site May ... are being conducted at NNSA's Nevada National Security Site (NNSS) and will ...

  13. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Conducts Pollux Subcritical Experiment at Nevada National Security Site LAS VEGAS - The ... was successfully conducted December 5, 2012, at its Nevada National Security Site (NNSS). ...

  14. NEVADA SPARKS RESIDENTS TO IMPROVE ENERGY FITNESS | Department...

    Broader source: Energy.gov (indexed) [DOE]

    NEVADA SPARKS RESIDENTS TO IMPROVE ENERGY FITNESS Following significant population growth and economic prosperity in the last decade, Nevada was hit by the economic downturn with ...

  15. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    CREWS FIGHTING WILDFIRE AT THE NEVADA NATIONAL SECURITY SITE North Las Vegas - Current information on the wildfire at the Nevada National Security Site (NNSS): NEW ...

  16. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Monitoring Report Released The Nevada National Security Site (NNSS) ... legacy radioactive contamination from the Nevada National Security Site. "As in past ...

  17. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Sensing Laboratory Aerial Measuring System in Las Vegas, Nevada, will perform the survey. ... are not alarmed. -30- Follow the NNSA Nevada Field Office on Facebook at: ...

  18. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NEVADA SCIENCE BOWL FOR MIDDLE SCHOOLS More than 100 students demonstrate their knowledge Hyde Park Middle School emerged undefeated to claim the championship of the Nevada ...

  19. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Groundwater Open House in Amargosa Valley, Nevada The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is sponsoring a groundwater open ...

  20. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Report Released The National Nuclear Security Administration Nevada Site Office (NNSANSO) has released the Nevada National Security Site Environmental Report 2010. The report ...

  1. Draft Nevada National Security Site Environmental Impact Statement...

    Office of Environmental Management (EM)

    Nevada National Security Site Environmental Impact Statement Released Draft Nevada National Security Site Environmental Impact Statement Released July 25, 2011 - 12:00pm Addthis ...

  2. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Waste Management Open House in Pahrump, Nevada The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is sponsoring a waste management ...

  3. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevada Field Office News News Media Contact: For Immediate Release: Darwin J. Morgan, ... to Meet A public meeting hosted by the Nevada Site Specific Advisory Board (NSSAB) will ...

  4. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nuclear Security Administration's (NNSA) Nevada National Security Site (NNSS) a ... responded." -30- Follow the NNSA Nevada Site Office on Facebook at: ...

  5. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Las Vegas Students Have the Need For Speed Nevada Science Bowl car races this Saturday The Nevada Science Bowl Middle School Car Races will be held this Saturday ...

  6. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Wackenhut Services, Inc., for award of a contract for security protective force and system services at the Nevada National Security Site (NNSS) and the NNSA Nevada Site Office. ...

  7. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevada Site Office News News Media Contact: For Immediate Release: Darwin J. Morgan, ... and Roger Thompson, both employees of the Nevada National Security Site (NNSS), are ...

  8. Nevada Site Office News News Media Contacts: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Kelly Snyder, (702) 295-3521 kelly.snyder@nnsa.doe.gov Nevada Site Office Releases Final Nevada National Security Site Environmental Impact Statement The U.S. ...

  9. Nevada Site Office News News Media Contact For Immediate Release...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (NNSA) has awarded Valley Electric Association, Inc., of Pahrump, Nevada, a contract to provide electric services for the agency's Nevada National Security Site (NNSS). ...

  10. Expanding Geothermal Resource Utilization in Nevada through Directed...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Expanding Geothermal Resource Utilization in Nevada through Directed Research and Public Outreach Expanding Geothermal Resource Utilization in Nevada through Directed Research and ...

  11. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Draft Nevada National Security Site Environmental Impact Statement Released The Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security ...

  12. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    contract for security support services at the Nevada National Security Site (NNSS). ... Security Assessments, support the Nevada Site Office classification program and ...

  13. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    GRITTY GULCH FIRE CONTAINED AT THE NEVADA NATIONAL SECURITY SITE North Las Vegas - Current information on the wildfire at the Nevada National Security Site (NNSS): NEW ...

  14. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Small Business Contract for Nevada National Security Site (NNSS) ... sites on the NNSS and Nevada Test and Training Range, including Tonopah Test Range. ...

  15. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hyde Park Middle School Wins Nevada Science Bowl Hyde Park to seek victory at ... competition undefeated as they captured the 2013 Nevada Science Bowl for middle schools. ...

  16. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Technologies Academy students win Nevada Regional Science Bowl The keys to winning ... The Super Bowl? No, the Science Bowl The 21 st annual Nevada Regional Science Bowl was ...

  17. Nevada National Security Site contractor receives safety recertificati...

    National Nuclear Security Administration (NNSA)

    Nevada National Security Site contractor receives safety recertification for 5th straight ... and operating contractor for the Nevada National Security Site, continues to ...

  18. Nevada Solar One Solar Power Plant | Open Energy Information

    Open Energy Info (EERE)

    Solar One Solar Power Plant Jump to: navigation, search Name Nevada Solar One Solar Power Plant Facility Nevada Solar One Sector Solar Facility Type Concentrating Solar Power...

  19. Central Nevada Seismic Zone Geothermal Region | Open Energy Informatio...

    Open Energy Info (EERE)

    Central Nevada Seismic Zone Geothermal Region Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Central Nevada Seismic Zone Geothermal Region Details Areas (3) Power...

  20. Nevada NRS 704.860, Utility Facility Definition | Open Energy...

    Open Energy Info (EERE)

    Not provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Nevada NRS 704.860, Utility Facility Definition Citation Nevada NRS...

  1. Nevada Test Site Environmental Report Attachment A: Site Description

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevada Test Site Environmental Report Attachment A: Site Description DOENV25946--790-ATT A Nevada Test Site Environmental Report 2008 Disclaimer Reference herein to any specific ...

  2. Episodic dike intrusions in the northwestern Sierra Nevada, California...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: Episodic dike intrusions in the northwestern Sierra Nevada, California: ... Title: Episodic dike intrusions in the northwestern Sierra Nevada, California: ...

  3. DOE - NNSA/NFO -- Nevada Test Tour Form

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    NTS Tour Forms NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Nevada National Security Site Tour Forms Groups and individuals wishing to tour the approximately ...

  4. DOE - NNSA/NFO -- Nevada Field Office Film Library

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Films > Current NFO Films NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Nevada Field Office Current Film Library Instructions: Click the Document Title or Thumbnail ...

  5. Energy Literacy in Action: Nevada Teachers Helping Students Learn...

    Office of Environmental Management (EM)

    Literacy in Action: Nevada Teachers Helping Students Learn About Energy Energy Literacy in Action: Nevada Teachers Helping Students Learn About Energy November 6, 2014 - 10:48am ...

  6. Geodetic Survey At Nevada Test And Training Range Area (Sabin...

    Open Energy Info (EERE)

    Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geodetic Survey At Nevada Test And...

  7. Geothermometry At Nevada Test And Training Range Area (Sabin...

    Open Energy Info (EERE)

    Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geothermometry At Nevada Test And...

  8. Nevada Test And Training Range Geothermal Area | Open Energy...

    Open Energy Info (EERE)

    Nevada Test And Training Range Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Nevada Test And Training Range Geothermal Area Contents 1 Area Overview...

  9. Modeling-Computer Simulations At Nevada Test And Training Range...

    Open Energy Info (EERE)

    Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Nevada...

  10. Geographic Information System At Nevada Test And Training Range...

    Open Energy Info (EERE)

    Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Geographic Information System At Nevada...

  11. Aerial Photography At Nevada Test And Training Range Area (Sabin...

    Open Energy Info (EERE)

    Nevada Test And Training Range Area (Sabin, Et Al., 2004) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Aerial Photography At Nevada Test And...

  12. RAPID/Overview/Geothermal/Exploration/Nevada | Open Energy Information

    Open Energy Info (EERE)

    Nevada < RAPID | Overview | Geothermal | Exploration(Redirected from RAPIDAtlasGeothermalExplorationNevada) Redirect page Jump to: navigation, search REDIRECT RAPID...

  13. DOE - Office of Legacy Management -- Nevada Test Site - 023

    Office of Legacy Management (LM)

    Nevada Test Site - 023 FUSRAP Considered Sites Site: Nevada Test Site (023) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site Disposition: ...

  14. Ronnie L. Alderson of Nevada Field Office presented 2012 Safety...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Ronnie L. Alderson of Nevada Field Office presented 2012 Safety System Oversight Annual Award Ronnie L. Alderson of Nevada Field Office presented 2012 Safety System Oversight ...

  15. Boulder City, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    in Boulder City, Nevada Copper Mountain Expansion I and II Solar Power Plant El Dorado Solar Project Solar Power Plant Nevada Solar One Solar Power Plant References US...

  16. Las Vegas, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    district.12 US Recovery Act Smart Grid Projects in Las Vegas, Nevada NV Energy, Inc. Smart Grid Project Registered Energy Companies in Las Vegas, Nevada Algodyne Ethanol...

  17. RAPID/Geothermal/Exploration/Nevada | Open Energy Information

    Open Energy Info (EERE)

    GeothermalExplorationNevada < RAPID | Geothermal | Exploration(Redirected from RAPIDOverviewGeothermalExplorationNevada) Jump to: navigation, search RAPID Regulatory...

  18. Nevada Bureau of Mines and Geology | Open Energy Information

    Open Energy Info (EERE)

    Address: University of Nevada178 Place: Nevada Zip: 89557 Website: www.nbmg.unr.eduOil&Gasindex Coordinates: 39.5440601, -119.8136573 Show Map Loading map......

  19. Geology and Mineral Deposits of Churchill County, Nevada | Open...

    Open Energy Info (EERE)

    Mineral Deposits of Churchill County, Nevada Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Geology and Mineral Deposits of Churchill County, Nevada...

  20. Black Warrior, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    or Black Warrior Spring coordinates Black Warrior is a property in Washoe County and Churchill County, Nevada that is south and east of Black Warrior Peak. References Nevada...

  1. NAC 703 - Public Utilities Commission of Nevada | Open Energy...

    Open Energy Info (EERE)

    of Nevada (2014). Retrieved from "http:en.openei.orgwindex.php?titleNAC703-PublicUtilitiesCommissionofNevada&oldid801184" Feedback Contact needs updating...

  2. Nevada Industrial Solid Waste Disposal Site Permit Application...

    Open Energy Info (EERE)

    Nevada Industrial Solid Waste Disposal Site Permit Application Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: Nevada Industrial Solid Waste Disposal Site...

  3. Magnetotelluric Data, Northern Frenchman Flat, Nevada Test Site Nevada

    SciTech Connect (OSTI)

    J.M. Williams; B.D. Rodriguez, and T. H. Asch

    2005-11-23

    Nuclear weapons are integral to the defense of the United States. The U.S. Department of Energy, as the steward of these devices, must continue to gauge the efficacy of the individual weapons. This could be accomplished by occasional testing at the Nevada Test Site (NTS) in Nevada, northwest of Las Vegas. Yucca Flat Basin is one of the testing areas at the NTS. One issue of concern is the nature of the somewhat poorly constrained pre-Tertiary geology and its effects on ground-water flow in the area subsequent to a nuclear test. Ground-water modelers would like to know more about the hydrostratigraphy and geologic structure to support a hydrostratigraphic framework model that is under development for the Yucca Flat Corrective Action Unit (CAU). During 2003, the U.S. Geological Survey (USGS) collected and processed Magnetotelluric (MT) and Audio-magnetotelluric (AMT) data at the Nevada Test Site in and near Yucca Flat to help characterize this pre-Tertiary geology. That work will help to define the character, thickness, and lateral extent of pre-Tertiary confining units. In particular, a major goal has been to define the upper clastic confining unit (UCCU) in the Yucca Flat area. Interpretation will include a three-dimensional (3-D) character analysis and two-dimensional (2-D) resistivity model. The purpose of this report is to release the MT sounding data for Frenchman Flat Profile 3, as shown in Figure 1. No interpretation of the data is included here.

  4. Fernley, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    2nd congressional district.12 Registered Energy Companies in Fernley, Nevada Brady Power Partners OHm Geothermal References US Census Bureau Incorporated place and...

  5. Nevada Natural Gas Consumption by End Use

    U.S. Energy Information Administration (EIA) Indexed Site

    Gulf of Mexico Hawaii Idaho Illinois Indiana Iowa Kansas Kentucky Louisiana Maine Maryland Massachusetts Michigan Minnesota Mississippi Missouri Montana Nebraska Nevada New...

  6. ,"Nevada Natural Gas LNG Storage Withdrawals (MMcf)"

    U.S. Energy Information Administration (EIA) Indexed Site

    Of Series","Frequency","Latest Data for" ,"Data 1","Nevada Natural Gas LNG Storage Withdrawals (MMcf)",1,"Annual",2014 ,"Release Date:","9302015" ,"Next Release...

  7. ,"Nevada Natural Gas LNG Storage Additions (MMcf)"

    U.S. Energy Information Administration (EIA) Indexed Site

    Of Series","Frequency","Latest Data for" ,"Data 1","Nevada Natural Gas LNG Storage Additions (MMcf)",1,"Annual",2014 ,"Release Date:","9302015" ,"Next Release...

  8. Nevada/Wind Resources | Open Energy Information

    Open Energy Info (EERE)

    Wind Guidebook >> Nevada Wind Resources WindTurbine-icon.png Small Wind Guidebook * Introduction * First, How Can I Make My Home More Energy Efficient? * Is Wind Energy Practical...

  9. Nevada Department of Wildlife | Open Energy Information

    Open Energy Info (EERE)

    Wildlife (NDOW) is the state agency responsible for the restoration and management of fish and wildlife resources, and the promotion of boating safety on Nevada's waters. NDOW is...

  10. Sierra Nevada Solar | Open Energy Information

    Open Energy Info (EERE)

    Sierra Nevada Solar Place: Sacramento, California Zip: 95828 Product: Vertically-integrated PV systems integrator and installer. Coordinates: 38.579065, -121.491014 Show Map...

  11. Nevada Irrigation District | Open Energy Information

    Open Energy Info (EERE)

    search Name: Nevada Irrigation District Place: California Website: nidwater.com Outage Hotline: (530) 273-6185 References: EIA Form EIA-861 Final Data File for 2010 -...

  12. Sierra Nevada Partners | Open Energy Information

    Open Energy Info (EERE)

    Incline Village, Nevada Zip: 89450 Sector: Renewable Energy, Solar Product: Investment firm actively seeking acquisitions in renewable energy, in particular, solar in the western...

  13. ,"Nevada Natural Gas Gross Withdrawals and Production"

    U.S. Energy Information Administration (EIA) Indexed Site

    Name","Description"," Of Series","Frequency","Latest Data for" ,"Data 1","Nevada Natural Gas Gross Withdrawals and Production",10,"Annual",2014,"06301991" ,"Release...

  14. Nevada Transmission Siting Information | Open Energy Information

    Open Energy Info (EERE)

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Nevada Transmission Siting InformationPermittingRegulatory GuidanceGuide...

  15. Nevada National Security Site Wraps Up 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    LAS VEGAS – As 2013 activities come to a close, the Nevada National Security Site (NNSS) reports several noteworthy accomplishments for the year.

  16. Reservation Economic Summit: Nevada | Department of Energy

    Office of Environmental Management (EM)

    over the phases of the project. Download the RES 2012 presentation. Addthis Related Articles Reservation Economic Summit: Nevada Indian Energy & Energy Infrastructure to be...

  17. Nevada State Environmental Commission | Open Energy Information

    Open Energy Info (EERE)

    variance requests is selected program areas administrated by NDEP as well as ratify air pollution enforcement actions (settlement agreements). Nevada State Environmental...

  18. Nevada Department of Transportation - Occupancy Permits | Open...

    Open Energy Info (EERE)

    Occupancy Permits Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Nevada Department of Transportation - Occupancy Permits Abstract This website gives...

  19. Nevada Archaeological Association Website | Open Energy Information

    Open Energy Info (EERE)

    Association Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Nevada Archaeological Association Website Abstract Provides information about...

  20. Nevada Guidelines for Evaluating and Documenting Traditional...

    Open Energy Info (EERE)

    Properties Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Nevada Guidelines for Evaluating and Documenting Traditional Cultural Properties...

  1. Waste Management Magazine Highlights Nevada National Security...

    Office of Environmental Management (EM)

    Management Magazine Highlights Nevada National Security Site Waste Management Magazine ... Like most low-level waste, RTGs disposed of at the NNSS were handled without any special ...

  2. Independent Activity Report, Nevada National Security Site -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Nevada National Security Site Operational Awareness Visit HIAR NNSS-2012-12-03 This Independent Activity Report documents an operational awareness oversight activity conducted by ...

  3. Independent Activity Report, Nevada National Security Site -...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 2012 Operational Awareness Oversight of the Nevada National Security Site HIAR NNSS-2012-08-16 This Independent Activity Report documents an operational awareness ...

  4. Nevada Department of Environmental Protection Public Notices...

    Open Energy Info (EERE)

    Not Provided DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for Nevada Department of Environmental Protection Public Notices Citation State...

  5. NEVADA BUREAU OF MINES AND GEOLOGY

    National Nuclear Security Administration (NNSA)

    pocket) ."" INTRODUCTION Energy Reports (1050 Seventeenth ... when available, stored in the NBMG Sample Library. ... More recently, API numbers usage in Nevada (see Meeuwig, ...

  6. Bunkerville, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    Bunkerville, Nevada: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 36.7730306, -114.1280249 Show Map Loading map... "minzoom":false,"mappings...

  7. NEVADA TEST SITE WASTE ACCEPTANCE CRITERIA

    SciTech Connect (OSTI)

    U.S. DEPARTMENT OF ENERGY, NATIONAL NUCLEAR SECURITY ADMINISTRATION, NEVADA SITE OFFICE

    2005-07-01

    This document establishes the U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site will accept low-level radioactive and mixed waste for disposal. Mixed waste generated within the State of Nevada by NNSA/NSO activities is accepted for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the Nevada Test Site Area 3 and Area 5 Radioactive Waste Management Site for storage or disposal.

  8. Nuclear Security Administration Nevada Site Office.

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    man- ager for environmental monitoring for the National Nuclear Security Administration Nevada Site Office. ... who sup- port the Waste Management Division (WMD) Radioactive ...

  9. Nevada/Transmission | Open Energy Information

    Open Energy Info (EERE)

    own transmission facilities in the State of Nevada: NV Energy, Bonneville Power Administration, and Valley Electric Association, Colorado River Commission, Los...

  10. EA-1849: Department of Energy Loan Guarantee to Ormat Nevada, Inc. for a Geothermal Power Facility in Nevada

    Broader source: Energy.gov [DOE]

    Ormat Nevada Inc. (ORMAT), through its subsidiaries, proposes to construct and operate three geothermal power production facilities and associated power transmission lines in northern Nevada. The...

  11. Nevada Test Site closure program

    SciTech Connect (OSTI)

    Shenk, D.P.

    1994-08-01

    This report is a summary of the history, design and development, procurement, fabrication, installation and operation of the closures used as containment devices on underground nuclear tests at the Nevada Test Site. It also addresses the closure program mothball and start-up procedures. The Closure Program Document Index and equipment inventories, included as appendices, serve as location directories for future document reference and equipment use.

  12. The politics of Peacekeeper Rail Garrison. Doctoral thesis

    SciTech Connect (OSTI)

    Van Tassel, A.R.

    1992-01-01

    In 1985, the Congress capped at 50 the number of Peacekeeper ICBMs that could be deployed in vulnerable Minuteman silos, thereby sending the Reagan administration and the Air Force in search of another basing mode so that 100 of the ton-warhead missiles could be deployed as recommended by the Scowcroft Commission. The result was Peacekeeper rail garrison--a strategic nuclear weapon system that combined the Peacekeeper missile with railroad trains garrisoned at military installations. The missile trains would have dispersed across the nation's railways only during times of 'national need like the Cuban Missile Crisis. This case study examines the politics of that weapon system in order to contribute to the literature regarding weapons acquisition, test a number of propositions suggested by the bureaucratic politics model, and assess the influence of nonbureaucratic forces and actors on Peacekeeper rail garrison's fortunes.

  13. Dual-circuit segmented rail phased induction motor

    DOE Patents [OSTI]

    Marder, Barry M.; Cowan, Jr., Maynard

    2002-01-01

    An improved linear motor utilizes two circuits, rather that one circuit and an opposed plate, to gain efficiency. The powered circuit is a flat conductive coil. The opposed segmented rail circuit is either a plurality of similar conductive coils that are shorted, or a plurality of ladders formed of opposed conductive bars connected by a plurality of spaced conductors. In each embodiment, the conductors are preferably cables formed from a plurality of intertwined insulated wires to carry current evenly.

  14. An Optimal Deployment of Wireless Charging Lane for Electric Vehicles on Highway Corridors

    SciTech Connect (OSTI)

    Huang, Yongxi

    2016-01-01

    We propose an integrated modeling framework to optimally locate wireless charging facilities along a highway corridor to provide sufficient in-motion charging. The integrated model consists of a master, Infrastructure Planning Model that determines best locations with integrated two sub-models that explicitly capture energy consumption and charging and the interactions between electric vehicle and wireless charging technologies, geometrics of highway corridors, speed, and auxiliary system. The model is implemented in an illustrative case study of a highway corridor of Interstate 5 in Oregon. We found that the cost of establishing the charging lane is sensitive and increases with the speed to achieve. Through sensitivity analyses, we gain better understanding on the extent of impacts of geometric characteristics of highways and battery capacity on the charging lane design.

  15. DOE to Transport Moab Mill Tailings by Rail | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    to Transport Moab Mill Tailings by Rail DOE to Transport Moab Mill Tailings by Rail August 5, 2008 - 2:40pm Addthis Department Approves Project Baseline and Obtains Nuclear Regulatory Commission Nod WASHINGTON, DC - The U.S. Department of Energy (DOE) today reaffirmed its prior decision to relocate mill tailings predominantly by rail from the former uranium-ore processing site near Moab, Utah, 30 miles north to Crescent Junction, Utah. As determined previously, oversized material that is not

  16. Fact #554: January 19, 2009 Energy Intensity of Light Rail Transit Systems

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    | Department of Energy 4: January 19, 2009 Energy Intensity of Light Rail Transit Systems Fact #554: January 19, 2009 Energy Intensity of Light Rail Transit Systems According to the 2007 National Transit Databases, the energy intensity of light transit rail systems in the U.S. ranges from about 2,000 Btu per passenger-mile to about 31,000 Btu per passenger-mile. There are only four light rail systems with energy intensity over 10,000 Btu per passenger-mile. These systems may have improved

  17. CNG-Hybrid: A Practical Path to "Net Zero Emissions" in Commuter Rail

    Broader source: Energy.gov [DOE]

    This 3-stage project proposes modernizing and hybridizing commuter rail locomotives by conversion to natural gas, using waste heat recovery, and employing intercooled gas turbine engines.

  18. Digging Begins at Hazardous Hanford Burial Ground- River Corridor Contractor Spent Two Years Preparing to Remediate 618-10

    Office of Energy Efficiency and Renewable Energy (EERE)

    RICHLAND, WASH. — After careful preparation and characterization, the Department of Energy’s (DOE) River Corridor contractor, Washington Closure Hanford, has begun remediation of one of the most hazardous burial grounds tackled to date on the Hanford Site’s River Corridor.

  19. Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in the West to help address growing energy demand while protecting the environment.

  20. Nevada Test Site Environmental Report 2004

    SciTech Connect (OSTI)

    BECHTEL NEVADA

    2005-10-01

    The ''Nevada Test Site Environmental Report 2004'' was prepared by Bechtel Nevada (BN) to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. This Executive Summary presents the purpose of the document, the major programs conducted at the Nevada Test Site (NTS), NTS key environmental initiatives, radiological releases and potential doses to the public resulting from site operations, a summary of non-radiological releases, implementation status of the NTS Environmental Management System, and significant environmental accomplishments. Much of the content of this Executive Summary is also presented in a separate stand-alone pamphlet titled ''Nevada Test Site Environmental Report Summary 2004''. It was produced this year to provide a more cost-effective and wider distribution of a hardcopy summary of the ''Nevada Test Site Environmental Report 2004'' to interested DOE stakeholders.

  1. First Subcritical Experiment Conducted at Nevada Test Site | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration | (NNSA) Subcritical Experiment Conducted at Nevada Test Site First Subcritical Experiment Conducted at Nevada Test Site Nevada Test Site, NV The first "subcritical" physics experiment at the Nevada Test Site, code-name "Rebound," provides scientific data on the behavior of plutonium without underground nuclear-weapons testing

  2. Nevada National Security Site Environmental Report Summary 2010

    SciTech Connect (OSTI)

    C. Wills, ed.

    2011-09-13

    This document summarizes the data reported in the Nevada National Security Site Environmental Report 2010.

  3. Rail transport of western coal: the history of rail deregulation and its influence on western coal resource development; prospects for legislative change

    SciTech Connect (OSTI)

    Smith, J.N.; Rose, R.R.

    1985-04-01

    The one major cloud on the horizon for the future of western coal outside the region is the high cost of transportation. With rail transportation costs running as much as 75% of the delivered price to some of the Gulf States, the ability to keep rail costs in check becomes critical to the future of western coal. Four years of experience with deregulation of the railroads and the performance of the Interstate Commerce Commission (ICC) under the new regulatory environment have led many shippers and buyers of rail transported commodities to the belief that national legislation is needed to give better protection to shippers in monopoly service areas. A tentative legislative effort began in the last Congress. Proposals for rail rate relief for captive shippers are taking more formidable shape in the 99th Congress with the organization of a well-financed and staffed coalition of coal and utility companies. They are seeking amendments to the Staggers Act which more explicitly define the protections and procedures available to captive shippers in advancing complaints through the ICC. Industrial shippers have formed a coalition of their own for fair rail service practices. Finally, another group has emerged in recent months seeking a bolder strategy for rail rate relief. This group asserts that unfair rail practices violate the antitrust laws. At the same time, the railroads are building their defenses and developing alliances with interests in the shipping community that would resist a return to greater rail regulation. While the outcome of this controversy is uncertain, the issue of rail rate equity and reregulation promises to become one of the more active and hotly debated issues in the 99th Congress. However it comes out, the results will have a lasting impact on many western states, their present economy and future development.

  4. Bechtel Nevada Post Office Box 98521 Las Vegas, NV 89193-8521

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevada Site Office DOENV11718--930 2003 Nevada Test Site Waste Management Monitoring ... DOENV11718--930 Nevada Test Site 2003 Waste Management Monitoring ...

  5. Nevada Field Office News News Media Contact: For Immediate Release:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevada Field Office News News Media Contact: For Immediate Release: Darwin J. Morgan, 702-295-3521 February 8, 2016 darwin.morgan@nnsa.doe.gov Kelly K. Snyder, 702-295-2836 kelly.snyder@nnsa.doe.gov DAVIDSON ACADEMY OF NEVADA WINS 2016 NEVADA SCIENCE BOWL Dozens of high schools compete for Nevada Science Bowl title Davidson Academy of Nevada roared to victory on Saturday in the 2016 Nevada Science Bowl. 32 teams started the day squaring off in the 25th Annual Nevada Science Bowl. Davidson

  6. Alternative Fuels Data Center: Nevada Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center [Office of Energy Efficiency and Renewable Energy (EERE)]

    Fuels and Vehicles Nevada Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Nevada Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Nevada Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Nevada Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: Nevada

  7. nevada national security site | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    nevada national security site NNSA Statement Regarding Nevada National Security Site Management & Operating Contract WASHINGTON - On August 26, 2016, the Department of Energy's National Nuclear Security Administration (DOE/NNSA) awarded the contract for the management and operation of the Nevada National Security Site (NNSS) to Nevada Site Science Support and Technologies Corporation (NVS3T). The... NNSA Awards Nevada National Security Site Management & Operating Contract to NVS3T

  8. DOE - Office of Legacy Management -- Nevada Test Site - 023

    Office of Legacy Management (LM)

    Nevada Test Site - 023 FUSRAP Considered Sites Site: Nevada Test Site (023) More information at http://energy.gov/em and http://www.nv.energy.gov Designated Name: Not Designated under FUSRAP Alternate Name: Nevada National Security Site; Nevada Test Site and Tonopah Test Range; NNSS Location: Nye County, Nevada Evaluation Year: Not considered for FUSRAP - in another program Site Operations: Nuclear weapons testing Site Disposition: Remediation in progress by DOE Office of Environmental

  9. Department of Energy Announces Plans for Additional Comment Period on National Interest Electric Transmission Corridors

    Broader source: Energy.gov [DOE]

    The Department has decided that, prior to issuing a report that designates any national interest electric transmission corridor, the Department will first issue any designation that it is considering in draft form, so as to allow additional opportunities for review and comment by affected States, regional entities, and the general public.

  10. Lessons Learned during Creation of the I-65 Biofuels Corridor (White Paper)

    SciTech Connect (OSTI)

    Not Available

    2009-06-01

    A team of Clean Cities coalitions and state agencies worked together to create a biofuels corridor along I-65 between Indiana and Alabama. The team built relationships with stakeholders and learned the value of strong partnerships, good communication, marketing, and preparation.

  11. 2011-03 "Using Rail transport for Moving Waste" | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    3 "Using Rail transport for Moving Waste" 2011-03 "Using Rail transport for Moving Waste" The intent of this NNMCAB recommendation is to see that the required cleanup at LANL is completed in the safest way, specifically relative to movement of waste. Rec 2011-03 - January 26, 2011 (158.28

  12. Magnetotelluric Data, Mid Valley, Nevada Test Site, Nevada.

    SciTech Connect (OSTI)

    Jackie M. Williams; Erin L. Wallin; Brian D. Rodriguez; Charles R. Lindsay; and Jay A. Sampson

    2007-08-15

    The United States Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) at their Nevada Site Office (NSO) are addressing ground-water contamination resulting from historical underground nuclear testing through the Environmental Management (EM) program and, in particular, the Underground Test Area (UGTA) project. One issue of concern is the nature of the somewhat poorly constrained pre-Tertiary geology and its effects on ground-water flow. Ground-water modelers would like to know more about the hydrostratigraphy and geologic structure to support a hydrostratigraphic framework model that is under development for the Rainier Mesa/Shoshone Mountain Corrective Action Unit (CAU) (Bechtel Nevada, 2006). During 2003, the U.S. Geological Survey (USGS), in cooperation with the DOE and NNSA-NSO, collected and processed data at the Nevada Test Site in and near Yucca Flat (YF) to help define the character, thickness, and lateral extent of the pre-tertiary confining units. We collected 51 magnetotelluric (MT) and audio-magnetotelluric (AMT), stations for that research (Williams and others, 2005a, 2005b, 2005c, 2005d, 2005e, 2005f). In early 2005 we extended that research with 26 additional MT data stations (Williams and others, 2006), located on and near Rainier Mesa and Shoshone Mountain (RM-SM). The new stations extended the area of the hydrogeologic study previously conducted in Yucca Flat. This work was done to help refine what is known about the character, thickness, and lateral extent of pre-Tertiary confining units. In particular, a major goal was to define the upper clastic confining unit (UCCU). The UCCU is comprised of late Devonian to Mississippian siliciclastic rocks assigned to the Eleana Formation and Chainman Shale. The UCCU underlies the Yucca Flat area and extends westward towards Shoshone Mountain, southward to Buckboard Mesa, and northward to Rainier Mesa. Late in 2005 we collected another 14 MT stations in Mid Valley and in

  13. Deep Resistivity Structure of Yucca Flat, Nevada Test Site, Nevada.

    SciTech Connect (OSTI)

    Theodore H. Asch, Brian D. Rodriguez; Jay A. Sampson; Erin L. Wallin; and Jackie M. Williams.

    2006-09-18

    The Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) at their Nevada Site Office are addressing groundwater contamination resulting from historical underground nuclear testing through the Environmental Management program and, in particular, the Underground Test Area project. One issue of concern is the nature of the somewhat poorly constrained pre Tertiary geology and its effects on ground-water flow in the area adjacent to a nuclear test. Ground water modelers would like to know more about the hydrostratigraphy and geologic structure to support a hydrostratigraphic framework model that is under development for the Yucca Flat Corrective Action Unit (CAU). During 2003, the U.S. Geological Survey, supported by the DOE and NNSA-NSO, collected and processed data from 51 magnetotelluric (MT) and audio-magnetotelluric (AMT) stations at the Nevada Test Site in and near Yucca Flat to assist in characterizing the pre-Tertiary geology in that area. The primary purpose was to refine the character, thickness, and lateral extent of pre Tertiary confining units. In particular, a major goal has been to define the upper clastic confining unit (late Devonian Mississippian-age siliciclastic rocks assigned to the Eleana Formation and Chainman Shale) in the Yucca Flat area. The MT and AMT data have been released in separate USGS Open File Reports. The Nevada Test Site magnetotelluric data interpretation presented in this report includes the results of detailed two-dimensional (2 D) resistivity modeling for each profile (including alternative interpretations) and gross inferences on the three dimensional (3 D) character of the geology beneath each station. The character, thickness, and lateral extent of the Chainman Shale and Eleana Formation that comprise the Upper Clastic Confining Unit are generally well determined in the upper 5 km. Inferences can be made regarding the presence of the Lower Clastic Confining Unit at depths below 5 km. Large fault

  14. Groundwater Flow Systems at the Nevada Test Site, Nevada: A Synthesis of Potentiometric Contours, Hydrostratigraphy, and Geologic Structures

    SciTech Connect (OSTI)

    Fenelon, Joseph M.; Sweetkind, Donald S.; Laczniak, Randell J.

    2010-01-25

    gradients between aquifer types are downward throughout most of the study area; however, flow from the alluvial-volcanic aquifer into the underlying carbonate aquifer, where both aquifers are present, is believed to be minor because of an intervening confining unit. Limited exchange of water between aquifer types occurs by diffuse flow through the confining unit, by focused flow along fault planes, or by direct flow where the confining unit is locally absent. Interflow between regional aquifers is evaluated and mapped to define major flow paths. These flow paths delineate tributary flow systems, which converge to form intermediate and regional flow systems. The implications of these flow systems in controlling transport of radionuclides away from the underground test areas at the Nevada Test Site are briefly discussed. Additionally, uncertainties in the delineation of aquifers, the development of potentiometric contours, and the identification of flow systems are identified and evaluated. Eleven tributary flow systems and three larger flow systems are mapped in the Nevada Test Site area. Flow systems within the alluvial-volcanic aquifer dominate the western half of the study area, whereas flow systems within the carbonate aquifer are most prevalent in the southeastern half of the study area. Most of the flow in the regional alluvial-volcanic aquifer that moves through the underground testing area on Pahute Mesa is discharged to the land surface at springs and seeps in Oasis Valley. Flow in the regional carbonate aquifer is internally compartmentalized by major geologic structures, primarily thrust faults, which constrain flow into separate corridors. Contaminants that reach the regional carbonate aquifer from testing areas in Yucca and Frenchman Flats flow toward downgradient discharge areas through the Alkali Flat-Furnace Creek Ranch or Ash Meadows flow systems and their tributaries.

  15. Nevada Test Site Environmental Report 2007

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    ... In addition to permit fees, NNSANSO must allow the State of Nevada Bureau of Air Pollution Control to conduct inspections of NTS facilities and operations that are regulated by ...

  16. Coral Power LLC (Nevada) | Open Energy Information

    Open Energy Info (EERE)

    search Name: Coral Power LLC Place: Nevada Phone Number: (916) 653-1097 Website: wwwcers.water.ca.govcoral.cfm Outage Hotline: (916) 653-1097 References: EIA Form EIA-861 Final...

  17. Nevada Test Site Environmental Report 2003

    SciTech Connect (OSTI)

    Bechtel Nevada

    2004-10-01

    The Nevada Test Site Environmental Report 2003 was prepared by Bechtel Nevada to meet the requirements and guidelines of the U.S. Department of Energy and the information needs of the public. This report is meant to be useful to members of the public, public officials, regulators, and Nevada Test Site contractors. The Executive Summary strives to present in a concise format the purpose of the document, the NTS mission and major programs, a summary of radiological releases and doses to the public resulting from site operations, a summary of non-radiological releases, and an overview of the Nevada Test Site Environmental Management System. The Executive Summary, combined with the following Compliance Summary, are written to meet all the objectives of the report and to be stand-alone sections for those who choose not to read the entire document.

  18. Nevada National Security Site Environmental Report 2013

    SciTech Connect (OSTI)

    Wills, C.

    2014-09-09

    This report was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) (formerly designated as the Nevada Site Office [NNSA/NSO]). The new field office designation occurred in March 2013. Published reports cited in this 2013 report, therefore, may bear the name or authorship of NNSA/NSO. This and previous years’ reports, called Annual Site Environmental Reports (ASERs), Nevada Test Site Environmental Reports (NTSERs), and, beginning in 2010, Nevada National Security Site Environmental Reports (NNSSERs), are posted on the NNSA/NFO website at http://www.nv.energy.gov/library/publications/aser.aspx.

  19. NATIONAL SECURITY TECHNOLOGIES - NEVADA NATIONAL SECURITY SITE

    National Nuclear Security Administration (NNSA)

    - NEVADA NATIONAL SECURITY SITE FISCAL YEARS 2009 THRU 2015 SMALL BUSINESS PROGRAM RESULTS & FORECAST CATEGORY Total Procurement Total SB Small Disad. Bus Woman-Owned SB Hub-Zone ...

  20. Sierra Nevada Brewing Company | Open Energy Information

    Open Energy Info (EERE)

    Nevada Brewing Company Place: Chico, California Zip: 95928 Product: A brewery with a 1MW fuel cell stack and 1.3MW PV array providing electricity for some of their operations....

  1. Nevada Field Office | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Nevada Field Office NNSA's safety office accredited and recognized for leadership in safe operation of defense nuclear facilities Part of NNSA's commitment to maintaining the nation's safe, secure, and effective nuclear deterrent are relentlessly high standards for technically capable nuclear enterprise personnel qualifications for all aspects of Defense Nuclear Facility operations. In December 2015, the Department of Energy... High schools compete for Nevada Science Bowl title The winner of the

  2. Nevada Site Office News News Media Contact: For Immediate Release:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    1, 2013 Darwin.Morgan@nnsa.doe.gov Hundreds of Smart Students Set To Try for Nevada Science Bowl Title The real bowl game is Saturday, not Sunday! Nevada Science Bowl! Hundreds of the smartest high school students from around the Southwest will test themselves this Saturday in the Nevada Science Bowl. The Nevada Science Bowl is the premiere academic competition in Nevada. It features a fast-paced "Jeopardy-style" format starring 32 high school teams from Nevada, California, and Utah.

  3. Shoal, Nevada Site Fact Sheet

    SciTech Connect (OSTI)

    2009-04-01

    The Shoal Site is situated on 2,560 acres of withdrawn federal lands located within the north-central portion of the Sand Springs Range in Churchill County, Nevada. The town of Fallon is the largest populated area in the region and is about 30 miles northwest of the site. The region around the Shoal Site is sparsely populated; military installations, recreation, ranching, and mining provide the dominant commercial interests. The Project Shoal underground nuclear test was part of the Vela Uniform program sponsored jointly by the U.S Department of Defense and U.S. Atomic Energy Commission (AEC), a predecessor agency of the U.S. Department of Energy (DOE). Vela Uniform was a research and development program directed toward locating, detecting, and identifying underground detonations. The objective of Project Shoal was to detonate a nuclear device underground in an active seismic area to improve the United States' ability to detect, identify, and locate underground nuclear detonations.

  4. Table Definitions, Sources, and Explanatory Notes

    Gasoline and Diesel Fuel Update (EIA)

    Rail

  5. A Historical Evaluation of the U12n Tunnel, Nevada National Security Site, Nye County, Nevada Part 1

    SciTech Connect (OSTI)

    Drollinger, Harold; Jones, Robert C; Bullard, Thomas F; Ashbaugh, Laurence J; Griffin, Wayne R

    2011-06-01

    This report presents a historical evaluation of the U12n Tunnel on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the U.S. Department of Defense, Defense Threat Reduction Agency (DTRA). The U12n Tunnel was one of a series of tunnels used for underground nuclear weapons effects tests in Rainier and Aqueduct Mesas. A total of 22 nuclear tests were conducted in the U12n Tunnel from 1967 to 1992. These tests include Midi Mist, Hudson Seal, Diana Mist, Misty North, Husky Ace, Ming Blade, Hybla Fair, Mighty Epic, Diablo Hawk, Miners Iron, Huron Landing, Diamond Ace, Mini Jade, Tomme/Midnight Zephyr, Misty Rain, Mill Yard, Diamond Beech, Middle Note, Misty Echo, Mineral Quarry, Randsburg, and Hunters Trophy. DTRA sponsored all tests except Tomme and Randsburg which were sponsored by the Lawrence Livermore National Laboratory. Midnight Zephyr, sponsored by DTRA, was an add on experiment to the Tomme test. Eleven high explosive tests were also conducted in the tunnel and included a Stemming Plan Test, the Pre-Mill Yard test, the two seismic Non-Proliferation Experiment tests, and seven Dipole Hail tests. The U12n Tunnel complex is composed of the portal and mesa areas, encompassing a total area of approximately 600 acres (240 hectares). Major modifications to the landscape have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to testing, and construction of retention ponds. A total of 202 cultural features were recorded for the portal and mesa areas. At the portal area, features relate to the mining, construction, testing, and general everyday operational support activities within the tunnel. These include concrete foundations for buildings, ventilation

  6. A Historical Evaluation of the U12n Tunnel, Nevada national Security Site, Nye County, Nevada Part 2 of 2

    SciTech Connect (OSTI)

    Drollinger, Harold; Jones, Robert C; Bullard, Thomas F; Ashbaugh, Laurence J; Griffin, Wayne R

    2011-06-01

    This report presents a historical evaluation of the U12n Tunnel on the Nevada National Security Site (NNSS) in southern Nevada. The work was conducted by the Desert Research Institute at the request of the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office and the U.S. Department of Defense, Defense Threat Reduction Agency (DTRA). The U12n Tunnel was one of a series of tunnels used for underground nuclear weapons effects tests in Rainier and Aqueduct Mesas. A total of 22 nuclear tests were conducted in the U12n Tunnel from 1967 to 1992. These tests include Midi Mist, Hudson Seal, Diana Mist, Misty North, Husky Ace, Ming Blade, Hybla Fair, Mighty Epic, Diablo Hawk, Miners Iron, Huron Landing, Diamond Ace, Mini Jade, Tomme/Midnight Zephyr, Misty Rain, Mill Yard, Diamond Beech, Middle Note, Misty Echo, Mineral Quarry, Randsburg, and Hunters Trophy. DTRA sponsored all tests except Tomme and Randsburg which were sponsored by the Lawrence Livermore National Laboratory. Midnight Zephyr, sponsored by DTRA, was an add on experiment to the Tomme test. Eleven high explosive tests were also conducted in the tunnel and included a Stemming Plan Test, the Pre-Mill Yard test, the two seismic Non-Proliferation Experiment tests, and seven Dipole Hail tests. The U12n Tunnel complex is composed of the portal and mesa areas, encompassing a total area of approximately 600 acres (240 hectares). Major modifications to the landscape have resulted from four principal activities. These are road construction and maintenance, mining activities related to development of the tunnel complex, site preparation for activities related to testing, and construction of retention ponds. A total of 202 cultural features were recorded for the portal and mesa areas. At the portal area, features relate to the mining, construction, testing, and general everyday operational support activities within the tunnel. These include concrete foundations for buildings, ventilation

  7. Underground test area quality assurance project plan, Nevada test site, Nevada. Revision 1

    SciTech Connect (OSTI)

    1997-04-01

    This Quality Assurance Project Plan (QAPP) is one of the planning documents used for the Underground Test Area (UGTA) Subproject at the Nevada Test Site (NTS) which falls under the oversight of the U.S. Department of Energy, Nevada Operations Office (DOE/NV) Nevada Environmental Restoration Project (NV ERP). The Nevada ERP consists of environmental restoration activities on the NTS, Tonopah Test Range, Nellis Air Force Range, and eight sites in five other states. The UGTA Subproject constitutes a component of the Nevada Environmental Restoration Project. The purposes of the UGTA Subproject are to define boundaries around each Corrective Action Unit (CAU), as defined by the Federal Facility Agreement and Consent Order (FFACO), that establish areas containing water that may be unsafe for domestic or municipal use and to establish monitoring programs for each CAU that will verify modeling upon which the boundaries are based.

  8. From: Martin Meyer To: Congestion Study Comments Subject: National Interest Electric Transmission Corridors (NIETC"s)

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Martin Meyer To: Congestion Study Comments Subject: National Interest Electric Transmission Corridors (NIETC"s) Date: Friday, September 19, 2014 2:10:18 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. Current public easements already exist. ROW for transportation and easements for other publically regulated utilities could be made to cooperate on placement of their infrastructure within these existing routes before

  9. EnergyFit Nevada (formerly known as the Nevada Retrofit Initiative) final report and technical evaluation

    SciTech Connect (OSTI)

    Carvill, Anna; Bushman, Kate; Ellsworth, Amy

    2014-06-17

    The EnergyFit Nevada (EFN) Better Buildings Neighborhood Program (BBNP, and referred to in this document as the EFN program) currently encourages Nevada residents to make whole-house energy-efficient improvements by providing rebates, financing, and access to a network of qualified home improvement contractors. The BBNP funding, consisting of 34 Energy Efficiency Conservation Block Grants (EECBG) and seven State Energy Program (SEP) grants, was awarded for a three-year period to the State of Nevada in 2010 and used for initial program design and implementation. By the end of first quarter in 2014, the program had achieved upgrades in 553 homes, with an average energy reduction of 32% per home. Other achievements included: Completed 893 residential energy audits and installed upgrades in 0.05% of all Nevada single-family homes1 Achieved an overall conversation rate of 38.1%2 7,089,089 kWh of modeled energy savings3 Total annual homeowner energy savings of approximately $525,7523 Efficiency upgrades completed on 1,100,484 square feet of homes3 $139,992 granted in loans to homeowners for energy-efficiency upgrades 29,285 hours of labor and $3,864,272 worth of work conducted by Nevada auditors and contractors4 40 contractors trained in Nevada 37 contractors with Building Performance Institute (BPI) certification in Nevada 19 contractors actively participating in the EFN program in Nevada 1 Calculated using 2012 U.S. Census data reporting 1,182,870 homes in Nevada. 2 Conversion rate through March 31, 2014, for all Nevada Retrofit Initiative (NRI)-funded projects, calculated using the EFN tracking database. 3 OptiMiser energy modeling, based on current utility rates. 4 This is the sum of $3,596,561 in retrofit invoice value and $247,711 in audit invoice value.

  10. From: Alex Free To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    05:34 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undo burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. Second, I believe that condemning private property for transmission lines in one state to transport electricity to another is a violation of property rights

  11. From: Alex Free To: Congestion Study Comments Subject: National Interest Energy Transmission Corridors

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    10:45 PM I am opposed to the establishment of National Interest Energy Transmission Corridors (NIETC's) for the following reasons. First, the easements place an undo burden on landowners on and near the transmission lines. The compensation cannot begin to cover the all of the losses, tangible and intangible that landowners would suffer. Second, I believe that condemning private property for transmission lines in one state to transport electricity to another is a violation of property rights

  12. Road-corridor planning in the EIA procedure in Spain. A review of case studies

    SciTech Connect (OSTI)

    Loro, Manuel [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Politcnica de Madrid, Prof. Aranguren s Transport Research Centre Universidad Politcnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s Centro de investigacin del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politcnica de Madrid, Prof. Aranguren s Arce, Rosa M. [Department of Urban and Regional Planning and Environment, Civil Engineering School, Universidad Politcnica de Madrid, Prof. Aranguren s Transport Research Centre Universidad Politcnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s Centro de investigacin del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politcnica de Madrid, Prof. Aranguren s Ortega, Emilio [Transport Research Centre Universidad Politcnica de Madrid, ETSI Caminos, Canales y Puertos, Prof. Aranguren s Centro de investigacin del transporte, TRANSyT-UPM, ETSI Caminos, Canales y Puertos, Universidad Politcnica de Madrid, Prof. Aranguren s Department of Construction and Rural Roads, Forestry Engineering School, Universidad Politcnica de Madrid, Ciudad Universitaria s and others

    2014-01-15

    The assessment of different alternatives in road-corridor planning must be based on a number of well-defined territorial variables that serve as decision making criteria, and this requires a high-quality preliminary environmental assessment study. In Spain the formal specifications for the technical requirements stipulate the constraints that must be considered in the early stages of defining road corridors, but not how they should be analyzed and ranked. As part of the feasibility study of a new road definition, the most common methodology is to establish different levels of Territorial Carrying Capacity (TCC) in the study area in order to summarize the territorial variables on thematic maps and to ease the tracing process of road-corridor layout alternatives. This paper explores the variables used in 22 road-construction projects conducted by the Ministry of Public Works that were subject to the Spanish EIA regulation and published between 2006 and 2008. The aim was to evaluate the quality of the methods applied and the homogeneity and suitability of the variables used for defining the TCC. The variables were clustered into physical, environmental, land-use and cultural constraints for the purpose of comparing the TCC values assigned in the studies reviewed. We found the average quality of the studies to be generally acceptable in terms of the justification of the methodology, the weighting and classification of the variables, and the creation of a synthesis map. Nevertheless, the methods for assessing the TCC are not sufficiently standardized; there is a lack of uniformity in the cartographic information sources and methodologies for the TCC valuation. -- Highlights: We explore 22 road-corridor planning studies subjected to the Spanish EIA regulation. We analyze the variables selected for defining territorial carrying capacity. The quality of the studies is acceptable (methodology, variable weighting, mapping). There is heterogeneity in the methods for

  13. Steering system for a train of rail-less vehicles

    DOE Patents [OSTI]

    Voight, Edward T.

    1983-01-01

    A steering system for use with a multiple vehicle train permits tracking without rails of one vehicle after another. This system is particularly useful for moving conveyor systems into and out of curved paths of room and pillar underground mine installations. The steering system features an elongated steering bar pivotally connected to each of adjacent vehicles at end portions of the bar permitting angular orientation of each vehicle in respect to the steering bar and other vehicles. Each end portion of the steering bar is linked to the near pair of vehicle wheels through wheel yoke pivot arms about king pin type pivots. Movement of the steering bar about its pivotal connection provides proportional turning of the wheels to effect steering and tracking of one vehicle following another in both forward and reverse directions.

  14. Reducing the environmental impact of road and rail vehicles

    SciTech Connect (OSTI)

    Mayer, R.M.; Poulikakos, L.D.; Lees, A.R.; Heutschi, K.; Kalivoda, M.T.

    2012-01-15

    Methods have been developed to measure in situ the dynamic impact of both road and rail vehicles on the infrastructure and the environment. The resulting data sets have been analysed to quantify the environmental impacts in a transparent manner across both modes. A primary concern is that a small number of vehicles are being operated outside safe or regulatory limits which can have a disproportionate large impact. The analysis enables the various impacts to be ranked across both modes so enabling one to discern the benefits of intermodal transport. The impact of various policy options is considered and how to identify vehicles which can be classified as environmentally friendly. This would require European agreement as many heavy goods vehicle operate across country borders.

  15. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    26, 2013 Darwin.Morgan@nnsa.doe.gov Middle School Teams Set to Begin Brain Battle Nevada Science Bowl for Middle Schools This Saturday What does it take to win the Nevada Science ...

  16. Nuclear Rocket Development Station at the Nevada Test Site |...

    Office of Environmental Management (EM)

    Rocket Development Station at the Nevada Test Site Nuclear Rocket Development Station at the Nevada Test Site During the 1950s, the United States launched a nuclear rocket program ...

  17. Disposal Practices at the Nevada Test Site 2008

    Office of Environmental Management (EM)

    Review of Disposal Practices at the Nevada Test Site Why DOE-EM Did This Review Radioactively contaminated materials from the Nevada Test Site (NTS), other DOE facilities and other ...

  18. BLM - State Protocol Agreement with Nevada | Open Energy Information

    Open Energy Info (EERE)

    State Protocol Agreement with Nevada Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: BLM - State Protocol Agreement with NevadaLegal...

  19. ,"Nevada Natural Gas Indutrial Price (Dollars per Thousand Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Data for" ,"Data 1","Nevada Natural Gas Indutrial Price (Dollars per ... 1:02:24 AM" "Back to Contents","Data 1: Nevada Natural Gas Indutrial Price (Dollars per ...

  20. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    December 11, 2013, the U.S. Department of Energy, National Nuclear Security Administration's Nevada Field Office will hold its 5th annual Groundwater Open House in Beatty, Nevada. ...

  1. Government-Owned Firearms Inventory at the Nevada National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Government-Owned Firearms Inventory at the Nevada National Security Site INS-L-15-01 ... 3, 2014 MEMORANDUM FOR THE MANAGER, NEVADA FIELD OFFICE FROM: Marilyn E. Richardson ...

  2. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    morgan@nv.doe.gov MEDIA ADVISORY An important step was taken today directed toward protecting desert tortoises at the Nevada National Security Site (formerly the Nevada Test Site). ...

  3. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevada Site Specific Advisory Board (NSSAB) will begin at 5 p.m., Wednesday, November 20, 2013, at the National Atomic Testing Museum, 755 East Flamingo Road, Las Vegas, Nevada. ...

  4. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    hosted by the Nevada Site Specific Advisory Board (NSSAB) will begin at 5 p.m., Wednesday, August 21, 2013, at the Bob Ruud Community Center, 150 N. Highway 160, Pahrump, Nevada. ...

  5. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    the Nevada Site Specific Advisory Board (NSSAB) will begin at 5 p.m., Wednesday, March 19, 2014, at the National Atomic Testing Museum, 755 East Flamingo Road, Las Vegas, Nevada. ...

  6. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Snyder, 702-295-3521 snyderk@nv.doe.gov Nevada National Security Site...on the Web and ... is now available at the touch of a screen at the Paseo Verde Library in Henderson, Nevada. ...

  7. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevada Field Office News News Media Contact: For Immediate Release: Darwin J. Morgan, ... 702-295-2836 kelly.snyder@nnsa.doe.gov NEVADA SCIENCE BOWL TO CROWN CHAMPION THIS ...

  8. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Knowledge in U.S. Department of Energy Nevada Regional Science Bowl Below what ... water?** If you know the answers, then you are ready for the Nevada Regional Science Bowl ...

  9. ,"Nevada Natural Gas Wellhead Price (Dollars per Thousand Cubic...

    U.S. Energy Information Administration (EIA) Indexed Site

    Data for" ,"Data 1","Nevada Natural Gas Wellhead Price (Dollars per ... 1:10:15 AM" "Back to Contents","Data 1: Nevada Natural Gas Wellhead Price (Dollars per ...

  10. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    seismic Source Physics Experiment (SPE-2) at the Nevada National Security Site (NNSS). ... Follow the NNSA Nevada Site Office on Facebook at: www.facebook.comNNSANevadaSiteOffice ...

  11. Memorandum of Understanding (MOU) Between the State of Nevada...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Memorandum of Understanding (MOU) Between the State of Nevada and the U.S. Department of Energy Memorandum of Understanding (MOU) Between the State of Nevada and the U.S. ...

  12. ,"Nevada Natural Gas Gross Withdrawals from Shale Gas (Million...

    U.S. Energy Information Administration (EIA) Indexed Site

    Data for" ,"Data 1","Nevada Natural Gas Gross Withdrawals from Shale ... 1:29:33 AM" "Back to Contents","Data 1: Nevada Natural Gas Gross Withdrawals from Shale ...

  13. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    (public) 7:52:47 PM INCIDENT AT THE NEVADA NATIONAL SECURITY SITE North Las Vegas - ... Facility in the central portion of the Nevada National Security Site. * It is a ...

  14. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    by the Nevada Site Specific Advisory Board (NSSAB) will begin at 5 p.m., Wednesday, July 16, 2014, at the National Atomic Testing Museum, 755 East Flamingo Road, Las Vegas, Nevada. ...

  15. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Nevada Site Specific Advisory Board (NSSAB) will begin at 4 p.m., Wednesday, September 10, 2014, at the National Atomic Testing Museum, 755 East Flamingo Road, Las Vegas, Nevada. ...

  16. ,"Nevada Dry Natural Gas Production (Million Cubic Feet)"

    U.S. Energy Information Administration (EIA) Indexed Site

    Data for" ,"Data 1","Nevada Dry Natural Gas Production (Million Cubic ... 1:11:52 AM" "Back to Contents","Data 1: Nevada Dry Natural Gas Production (Million Cubic ...

  17. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    September 13, 2011 morgan@nv.doe.gov Kelly K. Snyder, 702-295-3521 snyderk@nv.doe.gov Nevada Site Office Invites Public to Participate in Draft Nevada National Security Site ...

  18. SEP Success Story: Energy Department Supporting Nevada's Effort...

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    August 12, 2015 - 1:06pm Addthis Paul Thomsen, Director of the Nevada Governors Office of Energy, announces the new Nevada Electric Highway Joint Initiative in Carson City, ...

  19. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    hosted by the Nevada Site Specific Advisory Board (NSSAB) will begin at 5 p.m., Wednesday, May 21, 2014, at the Bob Ruud Community Center, 150 North Highway 160, Pahrump, Nevada. ...

  20. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    seismic Source Physics Experiment (SPE-3) at the Nevada National Security Site (NNSS). ... Visit www.nnsa.energy.gov for more information. Follow the NNSA Nevada Site Office on ...

  1. ,"Nevada Natural Gas Price Sold to Electric Power Consumers ...

    U.S. Energy Information Administration (EIA) Indexed Site

    Data for" ,"Data 1","Nevada Natural Gas Price Sold to Electric Power ... 1:03:29 AM" "Back to Contents","Data 1: Nevada Natural Gas Price Sold to Electric Power ...

  2. Nevada Site Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Hundreds of Smart Students Set To Try for Nevada Science Bowl Title The real bowl game is Saturday, not Sunday Nevada Science Bowl Hundreds of the smartest high school ...

  3. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Kelly K. Snyder, 702-295-3521 Kelly.Snyder@nnsa.doe.gov NEVADA SCIENCE BOWL TO TEST SKILLS OF HUNDREDS OF STUDENTS The real bowl game is Saturday, not Sunday Nevada Science Bowl ...

  4. Nevada Field Office News News Media Contact: For Immediate...

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    hosted by the Nevada Site Specific Advisory Board (NSSAB) will begin at 5:00 p.m., Wednesday, February 19, 2014, at the Beatty Community Center, 100 A Avenue South, Beatty, Nevada. ...

  5. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    SciTech Connect (OSTI)

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  6. Nevada Division of Water Resources | Open Energy Information

    Open Energy Info (EERE)

    Division of Water Resources Name: Nevada Division of Water Resources Address: 901 S. Stewart St., Suite 2002 Place: Carson city, Nevada Zip: 89701 Phone Number: 775-684-2800...

  7. DESERT RESEARCH INSTITUTE 11 UNIVERSITY OF NEVADA SYSTEM DOE...

    National Nuclear Security Administration (NNSA)

    DOEW10162--20 DE86 0 0 1 4 5 6 NEVADA TEST SITE RADIONUCLIDE INVENTORY AND ... by in situ spectrometry at 349 locations in Areas 2 and 4 of the Nevada Test Site. ...

  8. Volume II NEVADA TEST SITE ANNUAL SITE ENVIRONMENTAL

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    630-l 1 DOENVl 0630-l 1 Volume II NEVADA TEST SITE ANNUAL SITE ENVIRONMENTAL REPORT - ... DOENVl 0830-l 1 Volume II NEVADA TEST SITE ANNUAL SITE ENVIRONMENTAL REPORT - ...

  9. President Obama Discusses Solar Power in Nevada | Department...

    Office of Environmental Management (EM)

    Discusses Solar Power in Nevada President Obama Discusses Solar Power in Nevada March 22, 2012 - 10:26am Addthis President Barack Obama delivers remarks on energy after a tour of a ...

  10. EA-1784: Fotowatio Nevada Solar, LLC's Apex Solar Power Project...

    Broader source: Energy.gov (indexed) [DOE]

    July 1, 2010 DOI-BLM-NV-S010-2010-0149-EA: Bureau of Land Management's Final Environmental Assessment Fotowatio Nevada Solar, LLC's APEX Solar Power Project in Clark County, Nevada ...

  11. Clark County, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    in Clark County, Nevada Copper Mountain Expansion I and II Solar Power Plant El Dorado Solar Project Solar Power Plant Nellis AFB Solar Power Plant Nevada Solar One Solar...

  12. Dixie Valley, Nevada: Energy Resources | Open Energy Information

    Open Energy Info (EERE)

    article is a stub. You can help OpenEI by expanding it. Dixie Valley is a city in Churchill County, Nevada. Energy Generation Facilities in Dixie Valley, Nevada Dixie Valley...

  13. Usage of Electric Vehicle Supply Equipment Along the Corridors between the EV Project Major Cities

    SciTech Connect (OSTI)

    Mindy Kirkpatrick

    2012-05-01

    The report explains how the EVSE are being used along the corridors between the EV Project cities. The EV Project consists of a nationwide collaboration between Idaho National Laboratory (INL), ECOtality North America, Nissan, General Motors, and more than 40 other city, regional and state governments, and electric utilities. The purpose of the EV Project is to demonstrate the deployment and use of approximately 14,000 Level II (208-240V) electric vehicle supply equipment (EVSE) and 300 fast chargers in 16 major cities. This research investigates the usage of all currently installed EV Project commercial EVSE along major interstate corridors. ESRI ArcMap software products are utilized to create geographic EVSE data layers for analysis and visualization of commercial EVSE usage. This research locates the crucial interstate corridors lacking sufficient commercial EVSE and targets locations for future commercial EVSE placement. The results and methods introduced in this research will be used by INL for the duration of the EV Project.

  14. Assessment of the risk of transporting liquid chlorine by rail

    SciTech Connect (OSTI)

    Andrews, W.B.

    1980-03-01

    This report presents the risk of shipping liquid chlorine by rail. While chlorine is not an energy material, there are several benefits to studying chlorine transportation risks. First, chlorine, like energy materials, is widely used as a feedstock to industry. Second, it is the major purification agent in municipal water treatment systems and therefore, provides direct benefits to the public. Finally, other risk assessments have been completed for liquid chlorine shipments in the US and Europe, which provide a basis for comparison with this study. None of the previous PNL energy material risk assessments have had other studies for comparison. For these reasons, it was felt that a risk assessment of chlorine transportation by rail could provide information on chlorine risk levels, identify ways to reduce these risks and use previous studies on chlorine risks to assess the strengths and weaknesses of the PNL risk assessment methodology. The risk assessment methodology used in this study is summarized. The methodology is presented in the form of a risk assessment model which is constructed for ease of periodic updating of the data base so that the risk may be reevaluated as additional data become available. The report is sectioned to correspond to specific analysis steps identified in the model. The transport system and accident environment are described. The response of the transport system to accident environments is described. Release sequences are postulated and evaluated to determine both the likelihood and possible consequences of a release. Supportive data and analyses are given in the appendices. The risk assessment results are related to the year 1985 to allow a direct comparison with other reports in this series.

  15. Environmental Survey preliminary report, Nevada Test Site, Mercury, Nevada

    SciTech Connect (OSTI)

    Not Available

    1988-04-01

    This report presents the preliminary findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Nevada Test Site (NTS), conducted June 22 through July 10, 1987. The Survey is being conducted by a multidisciplinary team of environmental specialists led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team members are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with the NTS. The Survey covers all environment media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations and activities performed at the NTS, and interviews with site personnel. The Survey team developed a Sampling and Analysis Plan to assist in further assessing certain environmental problems identified during its on-site activities. The Sampling and Analysis Plan is being executed by the Battelle Columbus Division under contract with DOE. When completed, the results will be incorporated into the NTS Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the NTS Survey. 165 refs., 42 figs., 52 tabs.

  16. NEVADA SPARKS RESIDENTS TO IMPROVE ENERGY FITNESS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    NEVADA SPARKS RESIDENTS TO IMPROVE ENERGY FITNESS NEVADA SPARKS RESIDENTS TO IMPROVE ENERGY FITNESS NEVADA SPARKS RESIDENTS TO IMPROVE ENERGY FITNESS Following significant population growth and economic prosperity in the last decade, Nevada was hit by the economic downturn with some of the highest rates of foreclosure and unemployment in the country from 2011 to 2014. The state's unemployment rate was particularly high for home improvement professionals. To combat these challenges, EnergyFit

  17. Enforcement Letter, Bechtel Nevada - April 1, 2002 | Department...

    Office of Environmental Management (EM)

    Issued to Bechtel Nevada related to Noncompliances with Occupational Radiation Protection ... concerning potential occupational radiation protection and quality assurance ...

  18. Nevada National Security Site | National Nuclear Security Administration |

    National Nuclear Security Administration (NNSA)

    (NNSA) Nevada National Security Site The Nevada National Security Site (NNSS) safely conducts high-hazard operations, testing, and training in support of NNSA, the U.S. Department of Defense, and other agencies. NNSS is run by National Security Technologies, LLC. Visit our website NNSS NNSS Related News NNSA Statement Regarding Nevada National Security Site Management & Operating Contract NNSA Awards Nevada National Security Site Management & Operating Contract to NVS3T NNSA

  19. Modeling-Computer Simulations At Central Nevada Seismic Zone...

    Open Energy Info (EERE)

    navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Modeling-Computer Simulations At Central Nevada Seismic Zone Region (Pritchett, 2004) Exploration...

  20. Enterprise Assessments Review of the Nevada National Security Site Fire

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Protection Program - October 2015 | Department of Energy Nevada National Security Site Fire Protection Program - October 2015 Enterprise Assessments Review of the Nevada National Security Site Fire Protection Program - October 2015 October 2015 Review of the Fire Protection Program at the Nevada National Security Site The U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA) conducted an oversight review of the Nevada National Security Site (NNSS) fire protection

  1. 2014 Annual Planning Summary for the Nevada Field Office

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Nevada Field Office.

  2. Los Alamos conducts important hydrodynamic experiment in Nevada

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    LANL conducts hydrodynamic experiment in Nevada Los Alamos conducts important hydrodynamic experiment in Nevada Hydrodynamic experiments such as Leda involve non-nuclear surrogate materials that mimic many of the properties of nuclear materials. September 8, 2014 Technicians at the Nevada National Security Site make final adjustments to the "Leda" experimental vessel in the "Zero Room" at the underground U1a facility. Technicians at the Nevada National Security Site make

  3. Open House Gives Residents New Understanding of Nevada National Security

    Energy Savers [EERE]

    Site | Department of Energy Open House Gives Residents New Understanding of Nevada National Security Site Open House Gives Residents New Understanding of Nevada National Security Site August 15, 2016 - 12:15pm Addthis Nevada Site Specific Advisory Board (NSSAB) members, left to right, Pennie Edmond, Donna Hruska (NSSAB chair), Janice Keiserman, and Don Neill in front of the NSSAB display at the Groundwater Open House. Nevada Site Specific Advisory Board (NSSAB) members, left to right, Pennie

  4. Nevada Site Office News News Media Contact: For Immediate Release:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    19, 2011 morgan@nv.doe.gov Kelly K. Snyder, 702-295-3521 snyderk@nv.doe.gov Annual Environmental Monitoring Report Released The National Nuclear Security Administration Nevada Site Office (NNSA/NSO) has released the Nevada National Security Site Environmental Report 2010. The report summarizes the results of air and groundwater monitoring during calendar year 2010 on and off of the Nevada National Security Site (NNSS), formerly the Nevada Test Site. It also reports the estimated radiological

  5. Nevada Site Office News News Media Contact: For Immediate Release:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    October 22, 2012 Darwin.Morgan@nnsa.doe.gov NNSA Nevada Support Facility Receives LEED Gold Certificate LAS VEGAS - The National Nuclear Security Administration's (NNSA) Nevada Site Office has achieved a significant milestone with the naming of its Nevada Support Facility as Leadership in Energy and Environmental Design (LEED) Gold certified for existing buildings. Built in 1997, the Nevada Support Facility (NSF) located in North Las Vegas, houses federal and contractor employees. The LEED

  6. Nevada Site Office News News Media Contacts: For Immediate Release:

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Contacts: For Immediate Release: Darwin Morgan, (702) 295-3521 February 14, 2013 darwin.morgan@nnsa.doe.gov Kelly Snyder, (702) 295-3521 kelly.snyder@nnsa.doe.gov Nevada Site Office Releases Final Nevada National Security Site Environmental Impact Statement The U.S. Department of Energy, National Nuclear Security Administration (NNSA) Nevada Site Office has released the Final Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in

  7. Nevada Field Office | National Nuclear Security Administration | (NNSA)

    National Nuclear Security Administration (NNSA)

    Nevada Field Office FY15 Year End Report Semi Annual Report FY14 Year End Report Semi Annual Report

  8. 2011 Annual Planning Summary for Nevada Site Office (NSO)

    Broader source: Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Nevada Site Office (NSO).

  9. Concentrating Solar Power Projects - Nevada Solar One | Concentrating Solar

    Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

    Power | NREL Nevada Solar One This page provides information on Nevada Solar One, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration. Acciona Energy's Nevada Solar One is the third largest CSP plant in the world and the first plant built in the United States since 1999. Located in Boulder City, Nevada, about 40 miles southeast of Las Vegas, this parabolic trough system has been operating since June 2007. The US$260

  10. Nevada -- SEP Summary of Reported Data | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Summary of Reported Data Nevada -- SEP Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Nevada -- SEP. Nevada -- SEP Summary of Reported Data (2.21 MB) More Documents & Publications Virginia -- SEP Summary of Reported Data Alabama -- SEP Summary of Reported Data Michigan -- SEP Summary of Reported Data

  11. Cooled electronic system with thermal spreaders coupling electronics cards to cold rails

    DOE Patents [OSTI]

    Chainer, Timothy J; Gaynes, Michael A; Graybill, David P; Iyengar, Madhusudan K; Kamath, Vinod; Kochuparambil, Bejoy J; Schmidt, Roger R; Schultz, Mark D; Simco, Daniel P; Steinke, Mark E

    2013-07-23

    Liquid-cooled electronic systems are provided which include an electronic assembly having an electronics card and a socket with a latch at one end. The latch facilitates securing of the card within the socket or removal of the card from the socket. A liquid-cooled cold rail is disposed at the one end of the socket, and a thermal spreader couples the electronics card to the cold rail. The thermal spreader includes first and second thermal transfer plates coupled to first and second surfaces on opposite sides of the card, and thermally conductive extensions extending from end edges of the plates, which couple the respective transfer plates to the liquid-cooled cold rail. The thermally conductive extensions are disposed to the sides of the latch, and the card is securable within or removable from the socket using the latch without removing the cold rail or the thermal spreader.

  12. EA-1849: Ormat Nevada Geothermal Projects in Northern NV | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Energy 9: Ormat Nevada Geothermal Projects in Northern NV EA-1849: Ormat Nevada Geothermal Projects in Northern NV August 22, 2011 EA-1849: Final Environmental Assessment Tuscarora Geothermal Power Plant, Elko County, Nevada; Jersey Valley Geothermal Project, Pershing County, Nevada; and McGuiness Hills Geothermal Project, Lander County, Nevada August 22, 2011 EA-1849: Finding of No Significant Impact Ormat Nevada Northern Nevada Geothermal Power Plant Projects: Loan Guarantee for ORMAT

  13. 2015 EIA Energy Conference Crude Shipments and Rail Prioritization: A Shipper Perspective

    U.S. Energy Information Administration (EIA) Indexed Site

    Energy Conference Crude Shipments and Rail Prioritization: A Shipper Perspective Presented by: Jamie Heller Hellerworx, Inc. 301-654-1980 jamie@hellerworx.com Washington, DC, June 16, 2015 Presentation to: 2 * 2 Everyone Wants Flexibility! * Pipeline cheaper than rail, but ... * Shippers follow favorable basis differentials * Railroads redeploy assets as traffic shifts * Excess capacity costs money - no one wants to pay * Planning helps, but this is oil trading 3 Barge Movements of Crude 4

  14. Nevada National Security Site Waste Acceptance Criteria

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2011-01-01

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NNSSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NNSS Area 3 and Area 5 Radioactive Waste Management Complex for disposal. The NNSA/NSO and support contractors are available to assist you in understanding or interpreting this document. For assistance, please call the NNSA/NSO Waste Management Project at (702) 295-7063 or fax to (702) 295-1153.

  15. Nevada National Security Site Waste Acceptance Criteria

    SciTech Connect (OSTI)

    NSTec Environmental Management

    2010-09-03

    This document establishes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Nevada National Security Site Waste Acceptance Criteria (NNSSWAC). The NNSSWAC provides the requirements, terms, and conditions under which the Nevada National Security Site (NNSS) will accept low-level radioactive waste and mixed low-level waste for disposal. The NNSSWAC includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NNSS Area 3 and Area 5 Radioactive Waste Management Complex for disposal. The NNSA/NSO and support contractors are available to assist you in understanding or interpreting this document. For assistance, please call the NNSA/NSO Waste Management Project at (702) 295-7063 or fax to (702) 295-1153.

  16. EERE Success Story-Nevada Strengthens Electric Vehicle Infrastructure on

    Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

    Major U.S. Highway | Department of Energy Nevada Strengthens Electric Vehicle Infrastructure on Major U.S. Highway EERE Success Story-Nevada Strengthens Electric Vehicle Infrastructure on Major U.S. Highway December 15, 2015 - 3:55pm Addthis Paul Thomsen, Director of the Nevada Governor’s Office of Energy, announces the new Nevada Electric Highway Joint Initiative in Carson City, Nevada. He was joined at the event by Carson City Mayor Bob Crowell, left, NV Energy CEO Paul Caudill, and

  17. Nevada Test Site Environmental Report 2008 Summary

    SciTech Connect (OSTI)

    Cathy A. Wills

    2009-09-01

    The Nevada Test Site Environmental Report (NTSER) 2008 was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This and previous years’ NTSERs are posted on the NNSA/NSO website at http://www.nv.doe.gov/library/publications/aser.aspx.

  18. Nevada Test Site Radiation Protection Program

    SciTech Connect (OSTI)

    Radiological Control Managers' Council, Nevada Test Site

    2007-08-09

    Title 10 Code of Federal Regulations (CFR) 835, 'Occupational Radiation Protection', establishes radiation protection standards, limits, and program requirements for protecting individuals from ionizing radiation resulting from the conduct of U.S. Department of Energy (DOE) activities. 10 CFR 835.101(a) mandates that DOE activities be conducted in compliance with a documented Radiation Protection Program (RPP) as approved by DOE. This document promulgates the RPP for the Nevada Test Site (NTS), related (onsite or offsite) DOE National Nuclear Security Administration Nevada Site Office (NNSA/NSO) operations, and environmental restoration offsite projects.

  19. Nevada Test Site Waste Acceptance Criteria

    SciTech Connect (OSTI)

    U. S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-10-01

    This document establishes the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) waste acceptance criteria (WAC). The WAC provides the requirements, terms, and conditions under which the Nevada Test Site (NTS) will accept low-level radioactive (LLW) and mixed waste (MW) for disposal. It includes requirements for the generator waste certification program, characterization, traceability, waste form, packaging, and transfer. The criteria apply to radioactive waste received at the NTS Area 3 and Area 5 Radioactive Waste Management Complex (RWMC) for storage or disposal.

  20. Nevada Test Site Environmental Report 2008

    SciTech Connect (OSTI)

    Cathy A. Wills

    2009-09-01

    The Nevada Test Site Environmental Report (NTSER) 2008 was prepared to meet the information needs of the public and the requirements and guidelines of the U.S. Department of Energy (DOE) for annual site environmental reports. It was prepared by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This and previous years’ NTSERs are posted on the NNSA/NSO website at http://www.nv.doe.gov/library/publications/aser.aspx.