Powered by Deep Web Technologies
Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

BES Science Network Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the Basic Energy Sciences Network Requirements Workshop Conducted June 4-5, 2007 BES Science Network Requirements Workshop Basic Energy Sciences Program Office, DOE Office of...

2

Secure upgrade of hardware security modules in bank networks  

Science Journals Connector (OSTI)

We study the secure upgrade of critical components in wide networked systems, focussing on the case study of PIN processing Hardware Security Modules (HSMs). These tamper-resistant devices, used by banks to securely transmit and verify the PIN typed ... Keywords: PIN processing, hardware security modules, security APIs, upgrade strategies

Riccardo Focardi; Flaminia L. Luccio

2010-03-01T23:59:59.000Z

3

ASCR Science Network Requirements  

E-Print Network [OSTI]

ASCR Science Network Requirements Office of AdvancedScientific Computing Research, DOE Office of ScienceEnergy Sciences Network Gaithersburg, MD — April 15 and 16,

Dart, Eli

2010-01-01T23:59:59.000Z

4

BER Science Network Requirements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Network Network Requirements Report of the Biological and Environmental Research Network Requirements Workshop Conducted July 26 and 27, 2007 BER Science Network Requirements Workshop Biological and Environmental Research Program Office, DOE Office of Science Energy Sciences Network Bethesda, MD - July 26 and 27, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which is operated by the University of California for the US Department of Energy under contract DE-AC02-05CH11231. This work was supported by the Directors of the Office of Science, Office of Advanced Scientific Computing Research, Facilities Division, and the Office of Biological &

5

BES Science Network Requirements  

E-Print Network [OSTI]

the Directors of the Office of Science, Office of AdvancedOffice of Basic Energy Sciences. This is LBNL report LBNL-BES Science Network Requirements Report of the Basic Energy

Dart, Eli

2011-01-01T23:59:59.000Z

6

BER Science Network Requirements  

SciTech Connect (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2010 ESnet and the Office of Biological and Environmental Research, of the DOE Office of Science, organized a workshop to characterize the networking requirements of the science programs funded by BER. The requirements identified at the workshop are summarized and described in more detail in the case studies and the Findings section. A number of common themes emerged from the case studies and workshop discussions. One is that BER science, like many other disciplines, is becoming more and more distributed and collaborative in nature. Another common theme is that data set sizes are exploding. Climate Science in particular is on the verge of needing to manage exabytes of data, and Genomics is on the verge of a huge paradigm shift in the number of sites with sequencers and the amount of sequencer data being generated.

Dart, Eli; Tierney, Brian

2010-11-01T23:59:59.000Z

7

Energy-Efficient Capacity Upgrade in Optical Networks with Mixed Line Rates  

Science Journals Connector (OSTI)

We investigate the energy-efficient network upgrade problem. The traffic growth in a mixed-line-rate (10/40/100 Gbps) optical network is supported through both non-disruptive and...

Nag, Avishek; Tornatore, Massimo; Wang, Ting; Mukherjee, Biswanath

8

SG Network System Requirements Specification  

Broader source: Energy.gov (indexed) [DOE]

SG Network System Requirements Specification SG Network System Requirements Specification Interim Release 3 5/17/2010 - 2 - Table of Contents Document History ....................................................................................................................................... - 3 - Revision History .......................................................................................................................................... - 3 - Preface........................................................................................................................................................ - 4 - Authors........................................................................................................................................................ - 6 -

9

E-Print Network 3.0 - asdex upgrade results Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

system... , Germany Abstract ASDEX Upgrade, an experimental tokamak device for nuclear fusion research, requires... , commissioned such an experimental device, called ASDEX...

10

Fusion Energy Sciences Network Requirements  

E-Print Network [OSTI]

Division, and the Office of Fusion Energy Sciences. This isFusion Energy Sciences NetworkRequirements Office of Fusion Energy Sciences Energy

Dart, Eli

2014-01-01T23:59:59.000Z

11

Changes in measured lightning return stroke peak current after the 1994 National Lightning Detection Network upgrade  

E-Print Network [OSTI]

Since a comprehensive upgrade of the US National Lightning Detection Network (NLDN) in 1994, the mean peak current of detected cloud-to-ground (CG) lightning flashes has decreased, the number of detected flashes has increased, and the percentage...

Wacker, Robert Scott

2012-06-07T23:59:59.000Z

12

BER Science Network Requirements  

E-Print Network [OSTI]

Networking) David Benton, GLBRC/University of Wisconsin (and analysis tools. GLBRC currently comprises some 44 inter-year funding period of the GLBRC, while several terabytes of

Dart, Eli

2011-01-01T23:59:59.000Z

13

Network Requirements Workshop - Documents and Background Materials  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Science Requirements Reviews Network Requirements Reviews Documents and Background Materials Science Engagement Move your data Programs & Workshops Science...

14

Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements  

SciTech Connect (OSTI)

Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

French, Sean B [Los Alamos National Laboratory; Johns - Hughes, Kathryn W [Los Alamos National Laboratory

2011-01-21T23:59:59.000Z

15

Fusion Energy Sciences Network Requirements  

E-Print Network [OSTI]

Network Research) C.S. Chang, PPPL (Fusion Simulations) EliGreenwald, MIT PSFC (Alcator C-Mod) Paul Henderson, PPPL (PPPL Networking) Steve Jardin, PPPL (Fusion Simulations)

Dart, Eli

2014-01-01T23:59:59.000Z

16

Reducing Waste in Data Center Network Upgrades Andrew R. Curtis, S. Keshav, and Alejandro Lopez-Ortiz  

E-Print Network [OSTI]

of ports. Our key contributions are: · Analysis of the relative dollar and energy costs of reusing versus switches in their network--a tremendously wasteful proposition in terms of capital costs, energy used the minimum cost upgrade path for an existing network to sup- port a given traffic load. 1. INTRODUCTION Most

Waterloo, University of

17

E-Print Network 3.0 - asdex upgrade edge Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... collaborating institutes: 12;ASDEX Upgrade programme ... Source:...

18

E-Print Network 3.0 - asdex upgrade h-mode Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... collaborating institutes: 12;ASDEX Upgrade programme ... Source:...

19

E-Print Network 3.0 - asdex upgrade team Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrade Team presented by Sibylle Gnter MPI fr Plasmaphysik, D-85748 Garching, Germany, EURATOM... Overview of ASDEX Upgrade Results - Development of integrated operating...

20

Biological and Environmental Research Network Requirements  

SciTech Connect (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet be a highly successful enabler of scientific discovery for over 25 years. In November 2012, ESnet and the Office of Biological and Environmental Research (BER) of the DOE SC organized a review to characterize the networking requirements of the programs funded by the BER program office. Several key findings resulted from the review. Among them: 1) The scale of data sets available to science collaborations continues to increase exponentially. This has broad impact, both on the network and on the computational and storage systems connected to the network. 2) Many science collaborations require assistance to cope with the systems and network engineering challenges inherent in managing the rapid growth in data scale. 3) Several science domains operate distributed facilities that rely on high-performance networking for success. Key examples illustrated in this report include the Earth System Grid Federation (ESGF) and the Systems Biology Knowledgebase (KBase). This report expands on these points, and addresses others as well. The report contains a findings section as well as the text of the case studies discussed at the review.

Dart, Eli; Tierney, Brian

2013-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

E-Print Network 3.0 - asdex upgrade divertor Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Summary: of code runs have been done in modelling ASDEX Upgrade with a range of divertor input powers, densities... .g. by shaping of the divertor as in ASDEX Upgrade) is the...

22

BER Science Network Requirements Workshop -- July 26-27,2007  

SciTech Connect (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States of America. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In July 2007, ESnet and the Biological and Environmental Research (BER) Program Office of the DOE Office of Science organized a workshop to characterize the networking requirements of the science programs funded by the BER Program Office. These included several large programs and facilities, including Atmospheric Radiation Measurement (ARM) Program and the ARM Climate Research Facility (ACRF), Bioinformatics and Life Sciences Programs, Climate Sciences Programs, the Environmental Molecular Sciences Laboratory at PNNL, the Joint Genome Institute (JGI). National Center for Atmospheric Research (NCAR) also participated in the workshop and contributed a section to this report due to the fact that a large distributed data repository for climate data will be established at NERSC, ORNL and NCAR, and this will have an effect on ESnet. Workshop participants were asked to codify their requirements in a 'case study' format, which summarizes the instruments and facilities necessary for the science and the process by which the science is done, with emphasis on the network services needed and the way in which the network is used. Participants were asked to consider three time scales in their case studies--the near term (immediately and up to 12 months in the future), the medium term (3-5 years in the future), and the long term (greater than 5 years in the future). In addition to achieving its goal of collecting and characterizing the network requirements of the science endeavors funded by the BER Program Office, the workshop emphasized some additional points. These included the need for a future ESnet presence in the Denver area, a desire for ESnet to continue support of collaboration services, and the need for ESnet to support dedicated bandwidth or 'virtual circuit' services. In addition, it is clear that the BER facilities are going to experience significant growth in data production over the next 5 years. The reasons for this vary (model resolution and supercomputer allocations for climate, detector upgrades for EMSL and ARM, sequencing hardware upgrades for JGI), but all indicators point to significant growth in data volumes over the near to medium term. This growth in data volume, combined with the ever-expanding scope of scientific collaboration, will continue to demand ever-increasing bandwidth, reliability and service richness from the networks that support DOE science.

Tierney, Brian L.; Dart, Eli

2008-02-01T23:59:59.000Z

23

Data requirement comparison between the fixed site upgrade rule guidance compendium and the Structured Assessment Approach Licensee Submittal Document  

SciTech Connect (OSTI)

We compared the Structured Assessment Approach's (SAA) Licensee Submittal Document (LSD) with the Fixed Site Physical Protection Upgrade Rule Guidance Compendium Standard Format and Content (SFC) Guide using correlation matrices to see how well the data requirements of the SFC Guide coincided with those of a specific automated vulnerability assessment technique for fixed-site nuclear fuel cycle facilities, namely, SAA. We found that a limited SAA assessment is possible using the SFC Guide, but significant and critical safeguards vulnerabilities might be missed. Also, it was found that in some cases the organization and format of the SFC Guide input data and information made the preparation of data for the SAA somewhat awkward. 2 refs., 2 tabs.

Parziale, A.A.; Sacks, I.J.

1980-12-01T23:59:59.000Z

24

Nuclear Physics Science Network Requirements Workshop, May 2008 - Final Report  

E-Print Network [OSTI]

Gbps for NERSC. Total transatlantic requirements are on theof network planning, transatlantic bandwidth will need to bethe need for continued transatlantic connections back to

Tierney, Ed., Brian L

2008-01-01T23:59:59.000Z

25

HEP Science Network Requirements--Final Report  

E-Print Network [OSTI]

4.9 Impact of extended transatlantic circuit outages The LHCTable 1: Deployed Transatlantic Network Bandwidth Estimatesand Services • 80 Gbps transatlantic bandwidth • Traffic

Dart Ed, Eli

2010-01-01T23:59:59.000Z

26

Modeling the Water Scrubbing Process and Energy Requirements for CO2 Capture to Upgrade Biogas to Biomethane  

Science Journals Connector (OSTI)

Water scrubbing is the most widely used technology for removing CO2 from biogas and landfill gas. This work developed a rate-based mass transfer model of the CO2–water system for upgrading biogas in a packed bed absorption column. The simulated results ...

William J. Nock; Mark Walker; Rimika Kapoor; Sonia Heaven

2014-07-10T23:59:59.000Z

27

Standard Work Specifications for Single-Family Home Energy Upgrades...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Single-Family Home Energy Upgrades to define the minimum requirements for high- quality residential energy upgrades. The Standard Work Specifications for Single-Family...

28

Standard Work Specifications for Single-Family Home Energy Upgrades...  

Broader source: Energy.gov (indexed) [DOE]

for Single-Family Home Energy Upgrades to define the minimum requirements for high-quality residential energy upgrades. Today, the Standard Work Specifications provide a...

29

California Member Connects Solar Adoption With Upgrades  

Broader source: Energy.gov [DOE]

Studies on the connection between solar adoption and energy upgrades by Better Buildings Residential Network member Center for Sustainable Energy (CSE) in California are helping solar companies...

30

Biological and Environmental Research Network Requirements  

E-Print Network [OSTI]

required for specific climate projects are clearly defined.For example, if a climate project has unique node protocolto this high-profile climate project. ESGF has been used to

Dart, Eli

2014-01-01T23:59:59.000Z

31

Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Honeymoons Honeymoons Lead to Upgrades in Western Vermont to someone by E-mail Share Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Facebook Tweet about Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Twitter Bookmark Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Google Bookmark Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Delicious Rank Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on Digg Find More places to share Better Buildings Neighborhood Program: Honeymoons Lead to Upgrades in Western Vermont on AddThis.com... Better Buildings Residential Network Progress

32

High Energy Physics and Nuclear Physics Network Requirements  

SciTech Connect (OSTI)

The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements needed by instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 25 years. In August 2013, ESnet and the DOE SC Offices of High Energy Physics (HEP) and Nuclear Physics (NP) organized a review to characterize the networking requirements of the programs funded by the HEP and NP program offices. Several key findings resulted from the review. Among them: 1. The Large Hadron Collider?s ATLAS (A Toroidal LHC Apparatus) and CMS (Compact Muon Solenoid) experiments are adopting remote input/output (I/O) as a core component of their data analysis infrastructure. This will significantly increase their demands on the network from both a reliability perspective and a performance perspective. 2. The Large Hadron Collider (LHC) experiments (particularly ATLAS and CMS) are working to integrate network awareness into the workflow systems that manage the large number of daily analysis jobs (1 million analysis jobs per day for ATLAS), which are an integral part of the experiments. Collaboration with networking organizations such as ESnet, and the consumption of performance data (e.g., from perfSONAR [PERformance Service Oriented Network monitoring Architecture]) are critical to the success of these efforts. 3. The international aspects of HEP and NP collaborations continue to expand. This includes the LHC experiments, the Relativistic Heavy Ion Collider (RHIC) experiments, the Belle II Collaboration, the Large Synoptic Survey Telescope (LSST), and others. The international nature of these collaborations makes them heavily reliant on transoceanic connectivity, which is subject to longer term service disruptions than terrestrial connectivity. The network engineering aspects of undersea connectivity will continue to be a significant part of the planning, deployment, and operation of the data analysis infrastructure for HEP and NP experiments for the foreseeable future. Given their critical dependency on networking services, the experiments have expressed the need for tight integration (both technically and operationally) of the domestic and the transoceanic parts of the network infrastructure that supports the experiments. 4. The datasets associated with simulations continue to increase in size, and the need to move these datasets between analysis centers is placing ever-increasing demands on networks and on data management systems at the supercomputing centers. In addition, there is a need to harmonize cybersecurity practice with the data transfer performance requirements of the science. This report expands on these points, and addresses others as well. The report contains a findings section in addition to the text of the case studies discussed during the review.

Dart, Eli; Bauerdick, Lothar; Bell, Greg; Ciuffo, Leandro; Dasu, Sridhara; Dattoria, Vince; De, Kaushik; Ernst, Michael; Finkelson, Dale; Gottleib, Steven; Gutsche, Oliver; Habib, Salman; Hoeche, Stefan; Hughes-Jones, Richard; Ibarra, Julio; Johnston, William; Kisner, Theodore; Kowalski, Andy; Lauret, Jerome; Luitz, Steffen; Mackenzie, Paul; Maguire, Chales; Metzger, Joe; Monga, Inder; Ng, Cho-Kuen; Nielsen, Jason; Price, Larry; Porter, Jeff; Purschke, Martin; Rai, Gulshan; Roser, Rob; Schram, Malachi; Tull, Craig; Watson, Chip; Zurawski, Jason

2014-03-02T23:59:59.000Z

33

Evaluation of the TWRS SRID for Additional Requirements Resulting from W-420 Stack Monitoring System Upgrades [for 241C and 244A and BX and CF and S and TX  

SciTech Connect (OSTI)

Project W-420, Stack Monitoring System Upgrades, will provide new effluent sampling equipment on six Tank Waste Remediation System (TWRS) facilities. The upgraded systems will support the safe, continued conduct of operations and maintenance, will meet current environmental and Authorization Basis (AB) requirements, and will provide for high reliability and flexibility in support of Hanford's long term cleanup mission. The purpose of this paper is to describe the Project W-420 upgrade activities, and to show that the upgraded stack monitoring systems will be similar to existing systems in use in TWRS facilities and functionally identical to what is described in the safety bases for the affected facilities. Therefore, the current TWRS Standards/Requirements Identification Document (S/RID) is sufficient to cover the project and no new S/RID requirements are needed as a result of Project W-420. Additionally, Project W-420 hereby requests that the S/RID functional area Facility Experts (FEs) signify their concurrence with the signing the distribution sheet attached to this document.

TUCK, J.A.

1999-08-19T23:59:59.000Z

34

Institutional synergies in the delivery of urban upgrading services : lessons from the Slum Networking Program in Ahmedabad, India  

E-Print Network [OSTI]

This thesis examines factors associated with the limited success of the Slum Networking Project (SNP) implemented in the city of Ahmedabad, India between 1995 and 2001. The SNP was conceived as a partnership between ...

Samad, Taimur

2006-01-01T23:59:59.000Z

35

Recent Upgrade of the Klystron Modulator at SLAC  

SciTech Connect (OSTI)

The SLAC National Accelerator Laboratory employs 244 klystron modulators on its two-mile-long linear accelerator that has been operational since the early days of the SLAC establishment in the sixties. Each of these original modulators was designed to provide 250 kV, 262 A and 3.5 {mu}S at up to 360 pps using an inductance-capacitance resonant charging system, a modified type-E pulse-forming network (PFN), and a pulse transformer. The modulator internal control comprised of large step-start resistor-contactors, vacuum-tube amplifiers, and 120 Vac relays for logical signals. A major, power-component-only upgrade, which began in 1983 to accommodate the required beam energy of the SLAC Linear Collider (SLC) project, raised the modulator peak output capacity to 360 kV, 420 A and 5.0 {mu}S at a reduced pulse repetition rate of 120 pps. In an effort to improve safety, performance, reliability and maintainability of the modulator, this recent upgrade focuses on the remaining three-phase AC power input and modulator controls. The upgrade includes the utilization of primary SCR phase control rectifiers, integrated fault protection and voltage regulation circuitries, and programmable logic controllers (PLC) -- with an emphasis on component physical layouts for safety and maintainability concerns. In this paper, we will describe the design and implementation of each upgraded component in the modulator control system. We will also report the testing and present status of the modified modulators.

Nguyen, M.N.; Burkhart, C.P.; Lam, B.K.; Morris, B.; /SLAC

2011-11-04T23:59:59.000Z

36

Irrigation Hardware Upgrades  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

because the water discharge point is closer to the ground reducing wind drift of the water. Efficiency upgrades are also available for wheel line hubs and levelers. Please...

37

Capturing Energy Upgrades  

Broader source: Energy.gov [DOE]

Provides an overview of how to capture the value of energy efficiency upgrades in the real estate market, from CNT Energy.

38

Mapping SysML to Modelica to Validate Wireless Sensor Networks Non-Functional Requirements  

E-Print Network [OSTI]

Mapping SysML to Modelica to Validate Wireless Sensor Networks Non-Functional Requirements SamirML) and the Modelica language which promote the reusability and improve the development process. In this work, we elements in Modelica. Thanks to the SysML requirement diagram which is transformed into Modelica properties

Boyer, Edmond

39

FES Science Network Requirements - Report of the Fusion Energy Sciences Network Requirements Workshop Conducted March 13 and 14, 2008  

E-Print Network [OSTI]

the Office of Science— started as the Magnetic Fusion EnergyRequirements and Science Process All U.S. magnetic fusionMagnetic Fusion Energy Program 11 MIT Plasma Science &

Dart, Eli

2008-01-01T23:59:59.000Z

40

Biofuels : Upgraded New Solids  

Science Journals Connector (OSTI)

The main historical keywords for the three pathways are: Agglomeration: Briquettes are long-established upgraded solid fuels, especially based on coal. 1970s: first small scale pellet heating units build in t...

Dr. Marco Klemm; Ralf Schmersahl…

2012-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Biofuels : Upgraded New Solids  

Science Journals Connector (OSTI)

The main historical keywords for the three pathways are: Agglomeration: Briquettes are long-established upgraded solid fuels, especially based on coal. 1970s: first small scale pellet heating units build in t...

Dr. Marco Klemm; Ralf Schmersahl; Dr. Claudia Kirsten…

2013-01-01T23:59:59.000Z

42

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Broader source: Energy.gov (indexed) [DOE]

Technology Improves Upgrading Process for Unconventional Technology Improves Upgrading Process for Unconventional Oil Resources Innovative Technology Improves Upgrading Process for Unconventional Oil Resources April 9, 2013 - 1:57pm Addthis Washington, DC - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology. Heavy oil is crude oil that is viscous and requires thermally enhanced oil

43

Current networks require ad-hoc operating procedures by expert administrators to handle  

E-Print Network [OSTI]

1 Abstract Current networks require ad-hoc operating procedures by expert administrators to handle and operational procedures; and coordinate these changes with those caused by built-in element procedures ­ handle implemented in two complementary versions and is now being applied to automate several configuration

Yemini, Yechiam

44

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

heating system. The system will be composed of an AC/DC power conversion system, gyrotron source or other operational characteristic for the system will require upgrade. Only disruption qualification The Electron Cyclotron Heating System provides breakdown and startup assist through an electron cyclotron

Princeton Plasma Physics Laboratory

45

Cyclotron Institute Upgrade Project  

SciTech Connect (OSTI)

The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88”) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

Clark, Henry [Texas A& M University; Yennello, Sherry [Texas A& M University; Tribble, Robert [Texas A& M University

2014-08-26T23:59:59.000Z

46

Upgrading Below Grade Spaces  

Broader source: Energy.gov (indexed) [DOE]

Patrick H. Huelman, Sam Breidenbach, Steve Schirber Patrick H. Huelman, Sam Breidenbach, Steve Schirber NorthernSTAR Building America Partnership Upgrading Below Grade Spaces Residential Energy Efficiency Stakeholder March 1, 2012 Austin, TX * Act 1: Technical Challenges & Opportunities - Pat Huelman, University of Minnesota * Act 2: Assessing Homeowner Priorities & Risks - Sam Breidenbach, TDS Custom Construction * Act 3: An Industry Perspective - Steve Schirber, Cocoon Act 1. Upgrade Below Grade * Basement Remodeling: It Doesn't Get Any Riskier! - Combustion safety - Foundation moisture - Radon (& other soil gases) - Biologicals (mold, dust mites, etc.) - Garage gases (if attached) * And front and center are uncontrolled... - negative pressures in basements (beyond stack)

47

HERA Upgrade Project | Superconducting Magnet Division  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HERA Upgrade Project HERA Upgrade Project As part of the HERA luminosity upgrade, 6 superconducting Interaction Region quadrupoles were delivered, accepted, and are in service. These 6 layer magnets were designed to include the main quadrupole focus, a skew quad, a normal and skew dipole, and a final sextupole layer. Because of the physical space constraints imposed by the existing detector region components, the DESY magnets were of necessity designed to be very compact. In addition, they are also are required to operate within the solenoidal detector fields at the collision points, so all construction materials had to be non magnetic. Two types of DESY magnets were fabricated. The first, designated as G0, was a two meter long, constant radius magnet. The second, designated GG, is a

48

15 - Biogas upgrading to biomethane  

Science Journals Connector (OSTI)

Abstract: Compared with other utilization paths of biogas, upgrading of biogas to biomethane offers several advantages and has thus become of increased relevance in the last decade. This chapter describes past developments as well as the current state of upgrading, especially in Europe. Specifics of biogas cleaning combined with biogas upgrading will be described. The chapter focuses on technical aspects of upgrading and off-gas treatment methods as well as on economic aspects of biomethane provision.

Michael Beil; Wiebke Beyrich

2013-01-01T23:59:59.000Z

49

Biochemical upgrading of oils  

DOE Patents [OSTI]

A process for biochemical conversion of heavy crude oils is provided. The process includes contacting heavy crude oils with adapted biocatalysts. The resulting upgraded oil shows, a relative increase in saturated hydrocarbons, emulsions and oxygenates and a decrease in compounds containing organic sulfur, organic nitrogen and trace metals. Adapted microorganisms which have been modified under challenged growth processes are also disclosed. 121 figs.

Premuzic, E.T.; Lin, M.S.

1999-01-12T23:59:59.000Z

50

Steam turbine upgrades: A utility based approach  

SciTech Connect (OSTI)

In the increasingly competitive power generation markets utilities must strive towards lower electricity generation costs, whilst relying on an aging steam turbine fleet. By the year 2000 more than 25% of the global steam turbine capacity will be older than 30 years. The heat rate of such units is generally considerably higher than that of equivalent new plant, and such equipment can be further disadvantaged by increased maintenance costs and forced outage rates. Over the past decade steam turbine conversion, modification, and upgrade packages have become an increasingly important part of the European steam turbine market. Furthermore, many utilities now realize that enhanced cost-effectiveness can often be obtained by moving away from the original equipment manufacturer (OEM), and the upgrading of other manufacturers' plant is now routine within the steam turbine industry. By working closely with customers, GE has developed a comprehensive range of steam turbine upgrade packages, including advanced design steampaths which can increase the performance of existing turbine installations to levels comparable with new plant. Such packages are tailor-made to the requirements of each customer, to ensure that the most cost-effective engineering solution is identified. This paper presents an overview of GE's state-of-the-art steam turbine technology, and continues to describe typical economic models for turbine upgrades.

Wakeley, G.R.

1998-07-01T23:59:59.000Z

51

ATLAS Upgrades Towards the High Luminosity LHC  

E-Print Network [OSTI]

After successful LHC operation at the center-of-mass energy of 7 and 8 TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about few hundred fb?1 expected for LHC running to 3000 fb?1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and data a...

Cinca, D; The ATLAS collaboration

2014-01-01T23:59:59.000Z

52

Solid–Liquid–Vapor Equilibrium Models for Cryogenic Biogas Upgrading  

Science Journals Connector (OSTI)

In cryogenic upgrading processes involving dry ice formation, accurate predictions of solid–liquid, solid–vapor, and solid–liquid–vapor equilibria are fundamental for a correct design of the heat exchanger surface in order to achieve the desired biomethane purity. ... Moreover, the liquefied biogas production process, particularly interesting for cryogenic upgrading processes due to the low temperature of the obtained biomethane, requires an accurate knowledge of carbon dioxide solubility in liquid methane to avoid solid deposition. ... For some applications demanding a high energy content gas, namely vehicle fuels and injection in the natural gas grid, the biogas has to be upgraded into biomethane. ...

Mauro Riva; Marco Campestrini; Joseph Toubassy; Denis Clodic; Paolo Stringari

2014-10-13T23:59:59.000Z

53

Global Scratch Upgrade in Progress  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Global Scratch Gets Global Scratch Gets an Upgrade Global Scratch Gets an Upgrade Improvements Will Include Higher Data Output Rates, Connection to PDSF October 29, 2013 The most used file system at the National Energy Research Scientific Computing Center (NERSC)-global scratch-just got an upgrade. As a result, some users may see their data output to global scratch reach up to 80 gigabytes per second. Although users will probably not see their 20-terabyte storage quotas increase, the upgrade ensures that global scratch remains flexible and paves the way for PDSF to eventually use the file system Because of the upgrade, users will also be able to better access their temporary data files or "scratch data" from any NERSC system, not just the one that generated it. Prior to the upgrade, Global scratch typically

54

Proactive Price Regulation for Upgrading Telecommunications Infrastructure and Jon M. Peha  

E-Print Network [OSTI]

1 Proactive Price Regulation for Upgrading Telecommunications Infrastructure Qiong Wang 1 and Jon M to which society benefits from an upgrade to a telecommunications network infrastructure depends on when, Infrastructure, Regulation, Telecommunications, Monopoly Information Economics and Policy, Vol. 9, No. 2, June

Peha, Jon M.

55

Global Scratch Upgrade in Progress  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the facility is now positioned to meet the performance demands of all its clusters. By upgrading the consolidated Global Scratch, users will be able to continue taking advantage...

56

Upgraded Coal Interest Group  

SciTech Connect (OSTI)

The Upgraded Coal Interest Group (UCIG) is an EPRI 'users group' that focuses on clean, low-cost options for coal-based power generation. The UCIG covers topics that involve (1) pre-combustion processes, (2) co-firing systems and fuels, and (3) reburn using coal-derived or biomass-derived fuels. The UCIG mission is to preserve and expand the economic use of coal for energy. By reducing the fuel costs and environmental impacts of coal-fired power generation, existing units become more cost effective and thus new units utilizing advanced combustion technologies are more likely to be coal-fired.

Evan Hughes

2009-01-08T23:59:59.000Z

57

Pacific Direct Current Intertie (PDCI) Upgrade Project  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Accommodate increased power transmission - The upgrade will allow even more clean power, including hydro, wind and solar, to reach markets that need it. Upgrading and...

58

Upgrading the Vanadium Redox Battery | EMSL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Upgrading the Vanadium Redox Battery Upgrading the Vanadium Redox Battery New electrolyte mix increases energy storage by 70 percent After developing a more effective...

59

The PS Upgrade Program: Recent Advances  

E-Print Network [OSTI]

The LHC Injectors Upgrade project (LIU) has been initiated to improve the performances of the existing injector complex at CERN to match the future requirements of the HL-LHC (High Luminosity LHC). In this framework, the Proton Synchrotron (PS) will undergo fundamental changes for many of its main systems: the injection energy will be increased to reduce space-charge effects, the transverse damper will be improved to cope with transverse instabilities, and the RF systems will be upgraded to accelerate higher beam intensity and brightness. These hardware improvements are triggered by a series of studies meant to identify the most critical performance bottlenecks, like space charge, impedances, longitudinal and transverse instabilities, as well as electron-cloud. Additionally, alternative production schemes for the LHC-type beams have been proposed and implemented to circumvent some of the present limitations. A summary of the most recent advances of the studies, as well as the proposed hardware improvements is...

Gilardoni, SS; Bertone, C; Biancacci, N; Blas, A; Damjanovic, S; Bodart, D; Borburgh, J; Chiggiato, P; Damerau, H; Devine, JD; Dobers, T; Gourber-Pace, M; Hancock, S; Huschauer, A; Iadarola, G; Lopez Hernandez, LA; Masi, A; Mataguez, S; M´etral, E; Paoluzzi, M; Persichelli, S; Pittet, S; Rossi, C; Roesler, S; Rumolo, G; Salvant, B; Steerenberg, R; Sterbini, G; Vollaire, J; Wasef, R; Ventura, L; Yin Vallgren, C; Migliorati, M

2013-01-01T23:59:59.000Z

60

Upgrade of the MAGIC telescopes  

E-Print Network [OSTI]

The MAGIC telescopes are two Imaging Atmospheric Cherenkov Telescopes (IACTs) located on the Canary island of La Palma. With 17m diameter mirror dishes and ultra-fast electronics, they provide an energy threshold as low as 50 GeV for observations at low zenith angles. The first MAGIC telescope was taken in operation in 2004 whereas the second one joined in 2009. In 2011 we started a major upgrade program to improve and to unify the stereoscopic system of the two similar but at that time different telescopes. Here we report on the upgrade of the readout electronics and digital trigger of the two telescopes, the upgrade of the camera of the MAGIC I telescope as well as the commissioning of the system after this major upgrade.

Mazin, Daniel; Garczarczyk, Markus; Giavitto, Gianluca; Sitarek, Julian

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

User and Performance Impacts from Franklin Upgrades  

SciTech Connect (OSTI)

The NERSC flagship computer Cray XT4 system"Franklin" has gone through three major upgrades: quad core upgrade, CLE 2.1 upgrade, and IO upgrade, during the past year. In this paper, we will discuss the various aspects of the user impacts such as user access, user environment, and user issues etc from these upgrades. The performance impacts on the kernel benchmarks and selected application benchmarks will also be presented.

He, Yun (Helen)

2009-05-10T23:59:59.000Z

62

Upgrading and enhanced recovery of Jobo heavy oil using hydrogen donor under in-situ combustion  

E-Print Network [OSTI]

UPGRADING AND ENHANCED RECOVERY OF JOBO HEAVY OIL USING HYDROGEN DONOR UNDER IN-SITU COMBUSTION A... UPGRADING AND ENHANCED RECOVERY OF JOBO HEAVY OIL USING HYDROGEN DONOR UNDER IN-SITU COMBUSTION A Thesis by SAMIR HUSEYNZADE Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements...

Huseynzade, Samir

2008-10-10T23:59:59.000Z

63

Requirements and architecture design principles for a smart city experiment with sensor and social networks integration  

Science Journals Connector (OSTI)

Smart city infrastructures offer unique testbeds ground for innovative experimentation and services offering. Sensors networks in cities with integrated social networks activities can improve people-centric services, while improving infrastructures setting. ... Keywords: collective aware applications, sensors data management, smart city, social networks mining

Christos Samaras; Athena Vakali; Maria Giatsoglou; Despoina Chatzakou; Lefteris Angelis

2013-09-01T23:59:59.000Z

64

E-Print Network 3.0 - assurance requirements document Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Approval Documentation Due Diligence (Formerly APA1) Quality Management and Assurance... documentation Full Abridged Not required Required Not required Decision to be...

65

LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES | Department...  

Energy Savers [EERE]

LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES LOWELL ADDS ENERGY EFFICIENCY TO HISTORIC UPGRADES Faced with the challenge of...

66

Tank farm instrumentation and data acquisition/management upgrade plan  

SciTech Connect (OSTI)

This plan provides the strategy, implementation, and schedule for upgrading tank farm instrumentation, data acquisition and data management. The focus is on surveillance parameters to verify and maintain tank safety. The criteria do not necessarily constitute mandatory requirements but are based upon engineering judgement and best available information. Schedules reflect preliminary funding for FY95. For out years they are best engineering judgment.

Scaief, C.C. III

1994-09-13T23:59:59.000Z

67

upgrade | OpenEI Community  

Open Energy Info (EERE)

4 4 Varnish cache server Home Groups Community Central Green Button Applications Developer Utility Rate FRED: FRee Energy Database More Public Groups Private Groups Features Groups Blog posts Content Stream Documents Discussions Polls Q & A Events Notices My stuff Energy blogs 429 Throttled (bot load) Error 429 Throttled (bot load) Throttled (bot load) Guru Meditation: XID: 2142235354 Varnish cache server upgrade Home Rmckeel's picture Submitted by Rmckeel(297) Contributor 22 October, 2012 - 07:23 Semantic Mediawiki Semantic Forms update developer Incentives and Policies Semantic Mediawiki upgrade Utility Rates We have just updated Semantic Forms on OpenEI to version 2.4 to enable some upgrades to the utility rate forms (thanks Teresa!). If you see any problems in forms you use on OpenEI, please notify us by commenting on this

68

Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Network Network Facts & Stats Engineering Services The Network Network Maps Network Facts & Stats Connected Sites Peering Connections ESnet Site Availabiliy OSCARS Fasterdata...

69

E-Print Network 3.0 - air monitoring requirements Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Trent University Environmental and Resource Studies Program Summary: Chemistry 2 Sep. 22 Air Pollution Overview The Atmosphere Air Quality Monitoring Networks 1 3 Sep. 29......

70

CATEGORICAL EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES,  

Broader source: Energy.gov (indexed) [DOE]

EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES, EXCLUSION FOR 331 BUILDING IRRIGATION UPGRADES, 300 AREA, HANFORD SITE, RICHLAND, WASHINGTON Proposed Action: The U.S. Department of Energy (DOE), Pacific Northwest Site Office (PNSO) proposes to upgrade a landscaping irrigation system in the 300 Area. Location of Action: In the landscaped area around the 331 Building, Hanford Site Description of the Proposed Action: The proposed action is to upgrade the existing 331 Building landscaping irrigation system by using nearby aquaculture effluent instead of

71

LCLS LLRF Upgrades to the SLAC Linac  

SciTech Connect (OSTI)

The Linac Coherent Light Source (LCLS) at SLAC will be the brightest X-ray laser in the world when it comes on line. In order to achieve the brightness a 200fS length electron bunch is passed through an undulator. To create the 200fS, 3kA bunch, a 10pS electron bunch, created from a photo cathode in an RF gun, is run off crest on the RF to set up a position to energy correlation. The bunch is then compressed by chicanes. The stability of the RF system is critical in setting up the position to energy correlation. Specifications derived from simulations require the RF system to be stable to below 200fS in several critical injector stations and the last kilometer of linac. The SLAC linac RF system is being upgraded to meet these requirements.

Akre, R.; Dowell, D.; Emma, P.; Frisch, J.; Hong, B.; Kotturi, K.; Krejcik, P.; Wu, J.; /SLAC; Byrd, J.; /LBL, Berkeley

2007-10-04T23:59:59.000Z

72

LHC challenges and upgrade options  

Science Journals Connector (OSTI)

The presentation summarizes the key parameters of the LHC collider. Following a discussion of the main challenges for reaching the nominal machine performance the presentation identifies options for increasing the operation tolerances and the potential performance reach of the LHC by means of future hardware upgrades of the LHC and its injector complex.

O Bruning

2008-01-01T23:59:59.000Z

73

ATLAS Upgrade for sLHC Motivation  

E-Print Network [OSTI]

ATLAS Upgrade for sLHC · Motivation · LHC Upgrades · ATLAS Upgrade/schedule · R&D Variety · Russian Institutes involvement · Conclusions A.Cheplakov JINR, Dubna (on behalf of the ATLAS Collaboration) Many thanks to ATLAS colleagues for the useful information - N.Hessey, A.Loginov, A.Romaniouk, P

74

ATLAS Upgrade Week 1 November 11, 2009  

E-Print Network [OSTI]

ATLAS Upgrade Week 1 November 11, 2009 Proposal to Develop On-Detector Array-based Optical Link A. Maettig Universität Wuppertal K.K. Gan A. Pellegrino, T. Sluijk NIKHEF (LHCb) #12;ATLAS Upgrade Week 2;ATLAS Upgrade Week 3 Introduction VCSEL and PIN are available in three forms: single channel or 4

Gan, K. K.

75

E-Print Network 3.0 - abscess requiring intensive Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Intensive Care Units. This step requires that all... , be sensitive enough to detect small variations in the occurrence rate and should not require too much effort... then be...

76

E-Print Network 3.0 - alix binding requirements Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

alix binding requirements Search Powered by Explorit Topic List Advanced Search Sample search results for: alix binding requirements Page: << < 1 2 3 4 5 > >> 1 3025Commentary...

77

E-Print Network 3.0 - adenylation enzyme required Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

kinases in adenine nucleotide homeostasis and the requirement for such adenine nucleo- tide... . It is possible that adenyl- ate kinase activity is required for flagellar...

78

E-Print Network 3.0 - activation requires mitochondrial Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is required for fission activity41 . The recruitment of Dnm1 to yeast mitochondrial fis- sion... . Mitochondrial trans- port is required to distribute mitochondria throughout...

79

E-Print Network 3.0 - apoptosis requires translational Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

not required... susceptibility protein RB (LIN-35) is required for ... Source: Blackwell, Keith - Harvard University; Gartner, Anton - Wellcome Trust Centre for Gene Expression and...

80

Progress in MPC and A upgrades at Luch  

SciTech Connect (OSTI)

Luch, a MINATOM facility, has been engaged in both scientific research and uranium processing for fifty years. Since the spring of 1996, Luch has participated in a program of US/Russia Cooperation in Nuclear MPC and A Upgrades. The program began with planning for immediate upgrades in MPC and A, with en emphasis on physical protection. In addition, US and Luch experts exchanged technical data during a number of workshops, to establish a common understanding of available MPC and A tools and equipment. Site characterizations and vulnerability assessments were then prepared by Luch, to form the basis for the current program of methodical upgrades in all areas of MPC and A. Access control, alarms and alarm communications are being improved as part of this program. Control of nuclear material is being enhanced through improvements in material monitoring and in transportation security when nuclear material is moved between buildings on the Luch site. A comprehensive, site-wide computer network for Luch was designed during a recent workshop. Acquiring and installing this computer system, complete with COREMAS software, is currently in progress. Nuclear material analysis will be improved through NDA techniques using Canberra InSpector systems. The planned upgrades in nuclear MPC and A will reinforce safeguards over large quantities of HEU at Luch.

Mizin, P.; Chukov, V.; Rogatchev, V. [Gosudarstvennyj Nauchno-Issledovatel`skij Inst. NPO Luch, Podol`sk (Russian Federation); Curtiss, J. [Brookhaven National Lab., Upton, NY (United States); Erkkila, B. [Los Alamos National Lab., NM (United States); Goodey, K. [Pacific Northwest National Lab., Richland, WA (United States); Hembree, D. Jr. [Oak Ridge National Lab., TN (United States); Lowe, D. [Sandia National Labs., Albuquerque, NM (United States); Turner, C. [Lawrence Livermore National Lab., CA (United States)

1997-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Upgraded recovery boiler meets low air emissions standards  

SciTech Connect (OSTI)

In the fall of 1990, the Boise Cascade mill in International Falls, MN, carried out a millwide modernization project. One critical element of the project was the upgrade of their recovery boiler. As a result of the recovery boiler upgrade, the mill was required to obtain a prevention of significant deterioration (PSD) air permit. A best available control technology (BACT) assessment was performed as a requirement of the PSD regulations. Ultimately, a number of more stringent air pollution emission limits were established for the boiler, and a continuous emissions monitoring system (CEMS) was purchased and installed to report daily results to the Minnesota Pollution Control Agency. This paper describes efforts to achieve increased firing capacity in the mill's recovery boiler while meeting more severe air emissions regulations. The authors will show that each of the emissions limits, including CO, SO[sub 2], NO[sub x], TRS, and opacity, are met by the upgraded boiler, while achieving an increase in firing capacity over pre-upgrade levels of up to 40%.

La Fond, J.F.; Jansen, J.H. (Jansen Combustion and Boiler Technologies, Inc., Woodinville, WA (United States)); Eide, P. (Boise Cascade Corp., International Falls, MN (United States))

1994-12-01T23:59:59.000Z

82

About: Why Energy Efficiency Upgrades  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Why Energy Efficiency Upgrades Why Energy Efficiency Upgrades Two photos side by side showing energy loss through the use of infrared technology. As part of a home energy evaluation, an energy professional can use an infrared camera to pinpoint where air leaks and drafts are occurring in your home or building. Although normally difficult to see, these infrared photos clearly show in color where energy losses are occurring in a typical house. How We Use Energy in Our Buildings How We Use Energy in Our Homes (% of Energy Consumption) A pie chart illustrating the following breakdown: Space heating 43%, space cooling 9.7%, water heating 17.1%, lighting 6.2%, refrigeration 3.9%, electronics 3%, wet cleaning 3.2%, cooking 3.1%, computers 1.6%. Source: 2010 Buildings Energy Data Book, Table 2.1.6

83

Categorical Exclusion 4598: Security Upgrade Project  

Broader source: Energy.gov (indexed) [DOE]

Determination Form Determination Form Proposed Action Title: Security Upgrade Project (4598) Program or Field Office~ Y·12 Site Office LocationCs) CCjty/County/State): Oak Ridge. Anderson County, Tennessee Proposed Action Description: PAGE 04 / 04 r~:·:~~s ·'-u ~'irllO:.'~~b ., .. y " ~e ··· ., ;:;;,il ,;: ; I·;;;:;;,; ;I ,' .: :~~. ,U,Illll\;: , "':ll ,l3~ . ~~~~ 1 ~; The proposed action is to add fence posts and run razor wire in various fence locations throughout the site. This project will not require excavation. This activity will disturb gravel but will not remove gravel and soil from post holes which will be placed back in the same area. Cat.eg,orieal Exc!usion(s) ,Mp!i.cd: 81.3- Routine maintenance

84

E-Print Network 3.0 - anrep effect requires Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1.0 requires that the matches... * Abstract ... Source: Myers, Eugene W. - Janelia Farm Research Campus, Howard Hughes Medical Institute Collection: Computer Technologies and...

85

E-Print Network 3.0 - active process requiring Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

invoking a service that a process activity requires, receiving the result after... -oriented architecture, services and business processes are typically integrated by invoking...

86

E-Print Network 3.0 - agency contract requirements Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Plan (HSP) Summary: Self Performance HUB Subcontracting Plan (HSP) The contracting agency has determined... Subcontracting Plan is required. 1. Respondent and...

87

D0 Silicon Upgrade: Upgrade on Cryogenic Lines at Refrigerator  

SciTech Connect (OSTI)

This is an upgrade to the thermal contraction analysis sound in D0 Engineering Note: 3823.115-EN-426. In this new design, a portion of the transfer lines are consolidated into one 6-inch vacuum jacket. Since all four transfer lines follow the same path and are of equal lengths, the stress analysis is performed on only one transfer line using the design system ALGOR{reg_sign}. The GHe Cooldown Supply line is analyzed for combined pressure, thermal movement, and dead weight and all the stresses were below the allowable stress limit of 25,050 psi.

Kuwazaki, Andrew; /Fermilab

1995-09-26T23:59:59.000Z

88

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

09, 2013 09, 2013 Innovative Technology Improves Upgrading Process for Unconventional Oil Resources Washington, D.C. - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology. Heavy oil is crude oil that is viscous and requires thermally enhanced oil recovery methods, such as steam and hot water injection, to reduce its viscosity and enable it to flow. The largest U.S. deposits of heavy oil are in California and on Alaska's North Slope. Estimates for the U.S. heavy oil resource total about 104 billion barrels of oil in place - nearly five times the United States' proved reserves. In addition, although no commercial-scale development of U.S. oil sands or oil shale has yet occurred, both represent another potential future domestic unconventional oil resource.

89

Energy Upgrade California | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Upgrade California Upgrade California Energy Upgrade California < Back Eligibility Multi-Family Residential Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Other Sealing Your Home Ventilation Manufacturing Heating Windows, Doors, & Skylights Program Info Funding Source The American Reinvestment and Recovery Act of 2009, ratepayer funds State California Program Type State Rebate Program Rebate Amount Basic Upgrade Package: 1,000 Advance Upgrade Package: 1,500 - 4,000 The Energy Upgrade California program serves as a one-stop shop for California homeowners who want to improve the energy efficiency of their homes. The program connects homeowners with qualified contractors, and helps homeowners find all the available incentives from their local

90

BIOREFINING COMPOUNDS AND ORGANOCATALYTIC UPGRADING METHODS ...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

invention provides new methods for the direct umpolung self-condensation of 5-hydroxymethylfurfural (HMF) by organocatalysis, thereby upgrading the readily available substrate...

91

Upgrade Boilers with Energy-Efficient Burners  

SciTech Connect (OSTI)

This revised ITP steam tip sheet on upgrading boilers provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

Not Available

2006-01-01T23:59:59.000Z

92

Metal Organic Framework Adsorbent for Biogas Upgrading  

Science Journals Connector (OSTI)

In this context, this adsorbent can be used for biogas upgrading to produce biomethane and reduce fossil-fuel CO2. ...

Simone Cavenati; Carlos A. Grande; Alírio E. Rodrigues; Christoph Kiener; Ulrich Müller

2008-07-25T23:59:59.000Z

93

Network bandwidth requirements for optimized streaming media transmission to interactive users  

Science Journals Connector (OSTI)

In order to minimize bandwidth requirements and improve on demand streaming media distribution scalability, several distribution protocols based on stream sharing by multiple users have been proposed. Despite the great scalability of these protocols ...

Marcelo Maia; Marcus Rocha; Ítalo Cunha; Jussara Almeida; Sérgio Campos

2006-11-01T23:59:59.000Z

94

E-Print Network 3.0 - arabidopsis requires crn Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

: Original ESE requirements stated students and to take one course in each of 5 cores (EcoBiol; Life Cycle... credit) CRN: 19209 ENTM 61200 - 001 10:30 am - 12:20 pm W Smith...

95

Residential Network Members Impact More Than 42,000 Households  

Broader source: Energy.gov [DOE]

Eligible Better Buildings Residential Network members reported completing 27,563 home energy upgrades during 2013 as part of the Residential Network’s first reporting cycle. In addition, 13 Better...

96

Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

SciTech Connect (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the technical feasibility and cost of upgrading low-BTU methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys modular microchannel process technology. The objective of Phase II is to demonstrate the process at the bench-scale. Natural gas upgrading systems have six main unit operations: feed compressor, dehydration unit, nitrogen rejection unit, deoxygenator, carbon dioxide scrubber, and a sales compressor. The NRU is the focus of the development program, and a bench-scale demonstration has been initiated. The Velocys NRU system targets producing methane with greater than 96% purity and at least 90% recovery for final commercial operation. A preliminary cost analysis of the methane upgrading system, including the Velocys NRU, suggests that costs below $2.00 per million (MM) BTU methane may be achieved. The cost for a conventional methane upgrading system is well above $2.30 per MM BTU, as benchmarked in an Environmental Protection Agency study. The project is on schedule and on budget. Task 4, a bench-scale demonstration of the ultra-fast TSA system is complete. Rapid thermal swing of an adsorbent bed using microchannels has been successfully demonstrated and the separation of a 70% methane and 30% nitrogen was purified to 92% methane. The bench-scale demonstration unit was small relative to the system dead volume for the initial phase of experiments and a purge step was added to sweep the dead volume prior to desorbing the bed and measuring purity. A technical and economic feasibility assessment was completed in Task 3. The proposed Velocys technology appears feasible for the methane upgrading market. Evaluated categories include adsorbent selection, rapid-cycle valve selection, microchannel manufacturability assessment, and system design and cost. The selected adsorbent, granular microporous carbon from either Barnaby-Sutcliffe or Calgon, experimentally demonstrated sufficient methane capacity under differential temperature at 100 pounds per square inch gauge. Several valve options were identified, including candidates that can operate millions of cycles between refurbishment. The microchannel adsorber and desorber designs were made using internal Velocys manufacturability standards, and the associated costs are acceptable as included with the complete nitrogen rejection unit (NRU) cost projection. A system design and cost estimate was completed for the NRU section of the methane upgrading system. As integrated into the complete system, the cost is in line with the market requirement.

Anna Lee Tonkovich

2005-07-01T23:59:59.000Z

97

The upgrade of the ALICE Inner Tracking System  

E-Print Network [OSTI]

ALICE is a general purpose experiment dedicated to the study of nucleus-nucleus collisions at LHC. After more than 3 years of successful operation, an upgrade of the apparatus during the second long shutdown of LHC (LS2) in 2017/18 is in preparation. One of the major goals of the proposed upgrade is to extend the physics reach for rare probes at low transverse momentum. The reconstruction of the rare probes requires a precise determination of the primary and secondary vertices that is performed in ALICE by the Inner Tracking System (ITS). The present ITS made of 6 layers of three technologies of silicon devices allows, for example, to reconstruct D mesons with the transverse momentum down to ~2 GeV/c. Further extension of this range towards lower pT requires the installation of the new ITS consisting of 7 layers of silicon detectors with significantly better single point resolution and reduced material budget. It is expected that the new system will allow to improve the impact parameter resolution by a factor of ~3. Moreover, the data rate capability of the upgraded ITS should be significantly improved in order to exploit the full expected LHC lead-lead interaction rate of 50 kHz, almost two orders of magnitude above the present readout rate. The present contribution describes first the ITS upgrade requirements followed by the conceptual design of the new system and its expected performance. Secondly, an overview of the different R&D activities from the concept towards the final detector is given.

Serhiy Senyukov for the ALICE-ITS collaboration

2013-04-04T23:59:59.000Z

98

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

Work Authorization Document NSTX Upgrade Project Control Account #: 1302 Title: WBS 1.1.11 Title Functional Manager P. Heitzenroeder Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS and includes design modifications and upgrade of the coil assembly stand; procedures for assembling the Center

Princeton Plasma Physics Laboratory

99

ATLAS Upgrade Week 1 November 10, 2010  

E-Print Network [OSTI]

VCSEL/PIN Irradiation Study radiation hardness of VCSEL/PIN arrays since 2006: vendors: AOC arrays (2010): see next slides AOC 10 Gb/s VCSEL (2010): see next slides #12;K.K. Gan ATLAS Upgrade/cm2: 76% consistent with NIEL hypothesis #12;K.K. Gan ATLAS Upgrade Week 9 Irradiation of AOC

Gan, K. K.

100

NSTXpool Computer Upgrade December 9, 2010  

E-Print Network [OSTI]

NSTXpool Computer Upgrade WP #1685 Bill Davis December 9, 2010 #12;Work Scope Upgrade Operating System, Application Software, and Programs that run on NSTX computers using Red Hat Enterprise Linux 3. nstxpool computers + nstxops nstxWindowsPC (Control Room Display Wall) Big Blue cluster for EFIT Selected

Princeton Plasma Physics Laboratory

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

The Bottom Line Space@Penn Upgrade  

E-Print Network [OSTI]

The Bottom Line Space@Penn Upgrade Coming Soon! A project is underway to upgrade the current that allows designated users in the field to update certain elements of their space. This project, whose: Grants & Projects ­ Used for invoice generation, overhead and revenue recognition, and award and project

Sharp, Kim

102

LHC set to halt for upgrades  

Science Journals Connector (OSTI)

... particle collider is ready to take a well-earned rest. The Large Hadron Collider (LHC) will shut down on 11 February ahead of around two years of upgrade work. ... there will be no long holiday for the thousands of physicists who depend on the LHC for their data. A bruising schedule of maintenance, upgrades and forward planning will keep ...

Geoff Brumfiel

2013-02-06T23:59:59.000Z

103

Cyber-Physical System Requirements -A Model Driven Approach Cyber-physical systems (CPS) networked  

E-Print Network [OSTI]

systems such as infusion pumps. Complete and consistent requirements are central to analysis. A generic patient controlled analgesia (GPCA) infusion pump system was used as a case example to provide: Generic Patient Controlled Analgesia Infusion Pump System. Figure: Infusion Pump Plant Model. Figure

Minnesota, University of

104

Work Plan Guidelines and Standards Requirement | Department of...  

Energy Savers [EERE]

Assistance Program's (WAP) comprehensive Quality Work Plan establishes a benchmark for quality home energy upgrades. The plan includes a Guidelines and Standards requirement...

105

MMCR Upgrades: Present Status and Future Plans  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MMCR Upgrades: Present Status and Future Plans MMCR Upgrades: Present Status and Future Plans K. B. Widener and A. S. Koontz Pacific Northwest National Laboratory Richland, Washington K. P. Moran and K. A. Clark National Oceanic and Atmospheric Administration Environmental Technology Laboratory Boulder, Colorado C. Chander STC xxxxxxxxx M. A. Miller and K. L. Johnson Brookhaven National Laboratory Upton, New York Abstract In September 2003, the Southern Great Plains (SGP) millimeter wave cloud radar (MMCR) was upgraded to a new digital signal processor that significantly increases the temporal resolution and the processing capability of the MMCR. The Barrow MMCR upgrade will be completed in early 2004. We will discuss the hardware and software C40 upgrade to the MMCRs at SGP and Barrow and the plans

106

Research Laboratory Experiments with Energy Efficiency Upgrades |  

Broader source: Energy.gov (indexed) [DOE]

Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades August 30, 2012 - 11:52am Addthis Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Julie McAlpin Communications Liaison, State Energy Program

107

Future Upgrades | Brookhaven and the LHC  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Future Upgrades Future Upgrades Magnetic field inside a Nb3Sn quadropole magnet Magnetic field inside a Nb3Sn quadropole magnet. Brookhaven leads various technical coordination efforts for the upgrade of the ATLAS detector, including constructing the new silicon tracker, liquid argon electronics, and the new muon chambers. Brookhaven also contributes to the commissioning and future upgrade of the LHC itself in two areas: accelerator physics and superconducting magnets. This work is carried out as part of the U.S. LHC Accelerator Research Program (LARP) in collaboration with Fermilab, Lawrence Berkeley National Lab, and the Stanford Linear Accelerator Center. The ultimate goal of the upgrade program is to increase the rate and efficiency of particle collisions, a measure known as luminosity.

108

Research Laboratory Experiments with Energy Efficiency Upgrades |  

Broader source: Energy.gov (indexed) [DOE]

Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades Research Laboratory Experiments with Energy Efficiency Upgrades August 30, 2012 - 11:52am Addthis Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Energy efficiency upgrades -- such as geothermal heating and cooling, nanogel-filled windows, and lighting sensors -- will help the University of Kentucky Center for Applied Energy Research reduce energy use and save money. | Photo courtesy of the University of Kentucky. Julie McAlpin Communications Liaison, State Energy Program

109

Progress on the upgrade of the CMS Hadron Calorimeter Front-End electronics  

SciTech Connect (OSTI)

We present a scheme to upgrade the CMS HCAL front-end electronics in the second long shutdown to upgrade the LHC (LS2), which is expected to occur around 2018. The HCAL electronics upgrade is required to handle the major instantaneous luminosity increase (up to 5 * 10{sup 34} cm{sup -2} s{sup -1}) and an expected integrated luminosity of {approx}3000 fb{sup -1}. A key aspect of the HCAL upgrade is to read out longitudinal segmentation information to improve background rejection, energy resolution, and electron isolation at the L1 trigger. This paper focuses on the requirements for the new electronics and on the proposed solutions. The requirements include increased channel count, additional timing capabilities, and additional redundancy. The electronics are required to operate in a harsh environment and are constrained by the existing infrastructure. The proposed solutions span from chip level to system level. They include the development of a new ASIC ADC, the design and testing of higher speed transmitters to handle the increased data volume, the evaluation and use of circuits from other developments, evaluation of commercial FPGAs, better thermal design, and improvements in the overall readout architecture. We will report on the progress of the designs for these upgraded systems, along with performance requirements and initial design studies.

Anderson, Jake; Whitmore, Juliana; /Fermilab

2011-11-01T23:59:59.000Z

110

Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

About About Printable Version Share this resource Send a link to Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades to someone by E-mail Share Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Facebook Tweet about Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Twitter Bookmark Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Google Bookmark Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Delicious Rank Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on Digg Find More places to share Better Buildings Neighborhood Program: Why Energy Efficiency Upgrades on AddThis.com... Our History Related Federal Programs Why Energy Efficiency Upgrades

111

EECBG Success Story: Energy Efficiency Upgrades Part of Winning...  

Energy Savers [EERE]

EECBG Success Story: Energy Efficiency Upgrades Part of Winning Formula for Oregon School District EECBG Success Story: Energy Efficiency Upgrades Part of Winning Formula for...

112

Federal Finance Facilities Available for Energy Efficiency Upgrades...  

Energy Savers [EERE]

Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy...

113

Algal Lipid Extraction and Upgrading to Hydrocarbons Technology...  

Broader source: Energy.gov (indexed) [DOE]

and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks. Algal Lipid Extraction and Upgrading to Hydrocarbons...

114

Weatherization and Workforce Guidelines for Home Energy Upgrades...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

for Home Energy Upgrades Fact Sheet Weatherization and Workforce Guidelines for Home Energy Upgrades Fact Sheet This fact sheet provides essential information about the 2011...

115

Posted CX Q14 Sprinkler System Upgrade.pdf  

Broader source: Energy.gov (indexed) [DOE]

(NEPA) Categorical Exclusion (eX) (NEPA) Categorical Exclusion (eX) Determination Summary Form Q14 Sprinkler System Upgrade Project REFERENCE J 10 CFR Part 1021 , Department of Energy National Environmental Policy Act Implementation Procedures, Subpart 0 , Typical Classes of Actions PROJECT SCOPE DISCUSSION The project scope will upgrade the Q14 sprinkler system to meet exposed plastic design basis requirements by installing a fire pump and performing modifications to the Q14 sprinkler piping. The fire pump will be a pre-assembled skid system with enclosure diesel powered pump and associated diesel storage tank. The fire pump assembly wi ll be located on a foundation pad in the grassy area ,;!orthwest of 014. Electrical work will include providing general power to the fire pump building and fire pump control/alarm wiring to a fire alarm panel in the 014

116

Microsoft Word - CX-2013ElectronicEquipmentUpgrades_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

April 12, 2013 April 12, 2013 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Cleareance Memorandum Molly Kovaka Bob Trismen Contractor - TEP-CSB-2 Electrical Engineer - TEP-CSB-1 Proposed Action: Electronic Equipment Upgrades and Emergency Generator Replacements PP&A Project No: 2571 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B1.7 Electronic Equipment; B1.3 Routine maintenance activities Location: Multiple locations within Bonneville Power Administration's (BPA) service area. Proposed by: BPA Description of the Proposed Action: BPA proposes to upgrade electronic equipment required for operation of its transmission grid and replace emergency generators. Several types of actions involving communications, meters, relays, and Remedial Action Scheme (RAS) and Supervisory

117

Upgrading the Radioactive Waste Management Infrastructure in Azerbaijan  

SciTech Connect (OSTI)

Radionuclide uses in Azerbaijan are limited to peaceful applications in the industry, medicine, agriculture and research. The Baku Radioactive Waste Site (BRWS) 'IZOTOP' is the State agency for radioactive waste management and radioactive materials transport. The radioactive waste processing, storage and disposal facility is operated by IZOTOP since 1963 being significantly upgraded from 1998 to be brought into line with international requirements. The BRWS 'IZOTOP' is currently equipped with state-of-art devices and equipment contributing to the upgrade the radioactive waste management infrastructure in Azerbaijan in line with current internationally accepted practices. The IAEA supports Azerbaijan specialists in preparing syllabus and methodological materials for the Training Centre that is currently being organized on the base of the Azerbaijan BRWS 'IZOTOPE' for education of specialists in the area of safety management of radioactive waste: collection, sorting, processing, conditioning, storage and transportation. (authors)

Huseynov, A. [Baku Radioactive Waste Site IZOTOP, Baku (Azerbaijan); Batyukhnova, O. [State Unitary Enterprise Scientific and Industrial Association Radon, Moscow (Russian Federation); Ojovan, M. [Sheffield Univ., Immobilisation Science Lab. (United Kingdom); Rowat, J. [International Atomic Energy Agency, Dept. of Nuclear Safety and Security, Vienna (Austria)

2007-07-01T23:59:59.000Z

118

UPGRADING THE AGS TO 1 MW PROTON BEAM POWER.  

SciTech Connect (OSTI)

The Brookhaven Alternating Gradient Synchrotron (AGS) is a strong focusing accelerator that is used to accelerate protons and various heavy ion species to an equivalent proton energy of 29 GeV. At this energy the maximum intensity achieved is around 7 x 10{sup 13} protons per pulse. This corresponds to an average beam power of about 0.2 MW. Future programs in high-energy physics, as for instance a neutrino factory with the AGS as the proton driver [l], may require an upgrade of the AGS to an average beam power of 1 MW, at the energy of 24 GeV. This can be achieved with an increase of the beam intensity to 1 x 1014 protons per pulse, a 1.2-GeV superconducting linac as a new injector, and by upgrading the power supply and rf systems to allow cycling at 2.5 beam pulses per second.

BRENNAN,M.J.; MARNERIS,I.; ROSER,T.; RUGGIERO,A.G.; TRBOJEVIC,D.; ZHANG,S.Y.

2001-06-18T23:59:59.000Z

119

Pulsed power supply for Nova Upgrade. Final report, August 1, 1991 to March 31, 1992  

SciTech Connect (OSTI)

This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 {mu}m light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps.

Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C. [Univ. of Texas, Austin, TX (US). Center for Electromechanics] [Univ. of Texas, Austin, TX (US). Center for Electromechanics

1992-12-31T23:59:59.000Z

120

APS Upgrade | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

APS APS View Larger The brightness and energy of x-ray beams are critical properties for research. Higher brightness means more x-rays can be focused onto a smaller, laser-like spot, allowing researchers to gather more data in greater detail in less time. Higher energies allow x-rays to penetrate deeper inside materials to reveal crucial information about a material's structure and function. The combination of high brightness and high energy allows the observation and imaging - in real time - of fast and ultrafast technologically important processes, including fuel sprays, magnetic switching, and biological processes in living organisms. The APS Upgrade project will increase the brightness of the APS high-energy (hard) x-ray beams. This will equip researchers for the groundbreaking

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

APS Upgrade | Advanced Photon Source  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Workshop on new science opportunities provided by a multi-bend achromat lattice at the APS APS-U MBA Lattice Workshop Registration is now closed. Please contact Diane Wilkinson ext. 7810 or a member of the Workshop Organizing Committee for changes or modifications to your registration. Submit Comments, Suggestions, and Ideas for MBA Lattice Workshop October 21-22 Advanced Photon Source Argonne National Lab The Advanced Photon Source Upgrade is focused on delivering a powerful, versatile facility for science using high-brightness, high-energy X-rays. At APS, and around the light source community, scientists have been developing storage ring designs that push closer to the ultimate diffraction limit for X-ray sources. A recent report by the Basic Energy Sciences Advisory Committee, which advises the Director of the U.S.

122

ATLAS Nightly Build System Upgrade  

E-Print Network [OSTI]

The ATLAS Nightly Build System is a facility for automatic production of software releases. Being the major component of ATLAS software infrastructure, it supports more than 50 multi-platform branches of nightly releases and provides ample opportunities for testing new packages, for verifying patches to existing software, and for migrating to new platforms and compilers. The Nightly System testing framework runs several hundred integration tests of different granularity and purpose. The nightly releases are distributed and validated, and some are transformed into stable releases used for data processing worldwide. The first LHC long shutdown (2013-2015) activities will elicit increased load on the Nightly System as additional releases and builds are needed to exploit new programming techniques, languages, and profiling tools. This paper describes the plan of the ATLAS Nightly Build System Long Shutdown upgrade. It brings modern database and web technologies into the Nightly System, improves monitoring of nigh...

Dimitrov, G; The ATLAS collaboration; Simmons, B; Undrus, A

2013-01-01T23:59:59.000Z

123

CMS hadron calorimeter front-end upgrade for SLHC phase I  

SciTech Connect (OSTI)

We present an upgrade plan for the CMS HCAL detector. The HCAL upgrade is required for the increased luminosity (3 * 10E34) of SLHC Phase I which is targeted for 2014. A key aspect of the HCAL upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at the L1 trigger. The increased segmentation is achieved by replacing the hybrid photodiodes (HPDs) with silicon PMTs (SIPMs). We plan to instrument each fiber of the calorimeter with an SIPM (103,000 total). We will then electrically sum outputs from selected SIPMs to form the longitudinal readout segments. In addition to having more longitudinal information, the upgrade plans include a new custom ADC with matched sensitivity and timing information. The increased data volume requires higher speed transmitters and the additional power dissipation for the readout electronics requires better thermal design, since much of the on-detector infrastructure (front-end electronics crates, cooling pipes, optical fiber plant, etc.) will remain the same. We will report on the preliminary designs for these upgraded systems, along with performance requirements and initial design studies.

Whitmore, Juliana; /Fermilab

2009-09-01T23:59:59.000Z

124

Analysis of NSTX Upgrade OH Magnet and Center Stack  

SciTech Connect (OSTI)

The new ohmic heating (OH) coil and center stack for the National Spherical Torus Experiment (NSTX) upgrade are required to meet cooling and structural requirements for operation at the enhanced 1 Tesla toroidal field and 2 MA plasma current. The OH coil is designed to be cooled in the time between discharges by water flowing in the center of the coil conductor. We performed resistive heating and thermal hydraulic analyses to optimize coolant channel size to keep the coil temperature below 100 C and meet the required 20 minute cooling time. Coupled electromagnetic, thermal and structural FEA analyses were performed to determine if the OH coil meets the requirements of the structural design criteria. Structural response of the OH coil to its self-field and the field from other coils was analyzed. A model was developed to analyze the thermal and electromagnetic interaction of centerstack components such as the OH coil, TF inner legs and the Bellville washer preload mechanism. Torsional loads from the TF interaction with the OH and poloidal fields are transferred through the TF flag extensions via a torque transfer coupling to the rest of the tokamak structure. A 3D FEA analysis was performed to qualify this design. The results of these analyses, which will be presented in this paper, have led to the design of OH coil and centerstack components that meet the requirements of the NSTX-upgrade structural design criteria.

A. Zolfaghari, P. Titus, J. Chrzanowski, A. Salehzadeh, F. Dahlgren

2010-11-30T23:59:59.000Z

125

Screening of processing and upgrading schemes  

SciTech Connect (OSTI)

The RFP was predicated on DOE's desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily skimmed'' from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

Not Available

1991-10-01T23:59:59.000Z

126

AN APPLICATION OF GAME THEORY: FUNDING INTERDEPENDENT MC and A UPGRADE DECISIONS  

SciTech Connect (OSTI)

Funding Material, Control and Accountability (MC&A) system upgrades has been identified as a partial solution for mitigating the diversion threat of weapons-grade nuclear material. Effective MC&A system upgrades are dependent on appropriate decisions based on based on funding, implementation, operation and oversight. Traditional MC&A upgrade decisions inherently assumed that all decision-makers possessed similar payoff vectors allowing for a fairly consistent and unified approach to MC&A system enhancements; however, MC&A upgrade projects in non-traditional environments may be required to take into account situations where the potential payoff vectors among decision-makers may be significantly different. Once a decision-maker is required to take into account the decisions of others, the process can be modeled as a game. Game theory has been previously be used to shed light on many aspects of social and economic behavior where a payoff from a set of strategies is dependent on the strategy of others. In this paper, the application of game theory in the context of MC&A upgrades is discussed. Various MC&A upgrades decision payoff matrices for relevant circumstances are evaluated for static (simultaneous) and dynamic (sequential decisions) games. Optimal strategies and equilibrium conditions for these payoff matrices are analyzed. Additional game factors (bargaining, uncertain outcomes, moral hazards) that may affect the outcome of the game are briefly discussed. By demonstrating the application of game theory to a nontraditional environment that may require MC&A upgrades, this work increases the understanding out how outcomes are logically connected to the respective value decision-makers assign to choices.

B. G. SCOTT

2001-06-01T23:59:59.000Z

127

12 GeV Upgrade | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages

Science Science A Schematic of the 12 GeV Upgrade The 12 GeV Upgrade will greatly expand the research capabilities of Jefferson Lab, adding a fourth experimental hall, upgrading existing halls and doubling the power of the lab's accelerator. A D D I T I O N A L L I N K S: 12 GeV Home Public Interest Scientific Opportunities Hall D Status Updates Contacts Three-Year Accelerator Schedule 2014 - 2016 top-right bottom-left-corner bottom-right-corner 12 GeV Upgrade Physicists at Jefferson Lab are trying to find answers to some of nature's most perplexing questions about the universe by exploring the nucleus of the atom. Their goal is to answer such questions as: "What is the universe made of?" and "What holds everyday matter together?" In their search for answers, physicists smash electrons into atoms using

128

PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES  

Broader source: Energy.gov [DOE]

Designed to promote energy efficiency in buildings in Phoenix, Arizona’s 10-mile-long Light Rail Corridor, Energize Phoenix focused on performing energy upgrades and reducing energy use in...

129

EMPOWERING SANTA BARBARA TO INVEST IN UPGRADES  

Broader source: Energy.gov [DOE]

In Santa Barbara County, California, the weather is so temperate that even the least energy-efficient homes can still feel comfortable year-round. To help residents see that energy upgrades can...

130

MAST Upgrade Advancing compact fusion sources  

E-Print Network [OSTI]

as a stepping stone to greater involvement in the fusion sector and, in particular, the commercial opportunities to fusion research. MAST Upgrade will build on this progress, providing a truly world-class device capable

131

RECOVERY ACT: TAPOCO PROJECT: CHEOAH UPGRADE  

SciTech Connect (OSTI)

Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

Paul Tran; 293 Highway 740; Baden, NC 28009

2013-02-28T23:59:59.000Z

132

The upgraded scheme of Hefei Light Source  

SciTech Connect (OSTI)

To enhance the performance of Hefei Light Source, which was designed and constructed two decades ago, an upgrade project would be carried out in the near future. The detail upgrade scheme was described in this paper. Firstly, the magnet lattice of storage ring should be reconstructed with 4 DBA cells, whose advantages are lower beam emittance and more straight section available for insertion devices. Secondly, the beam diagnostics, main power supply, transverse and longitudinal multi-bunch feedback, beam control and manipulation system would be upgrade to improve the beam orbit stability. Finally, the injection system of storage ring and injector, which is composed of electron linac and beam transfer line, would be updated in order to assure smooth beam accumulation process under new low emittance lattice. With above improvement, it is hopeful to increase the brilliance of Hefei Light Source by two orders approximately. After three-year upgrade project, the performance of HLS would meet the demands of advanced SR users.

Li Weimin; Xu Hongliang; Wang Lin; Feng Guangyao; Zhang Shancai; Hao Hao [National Synchrotron Radiation Laboratory of University of Science and Technology of China, Anhui (China)

2010-06-23T23:59:59.000Z

133

High Flux Isotope Reactor power upgrade status  

SciTech Connect (OSTI)

A return to 100-MW operation is being planned for the High Flux Isotope Reactor (HFIR). Recent improvements in fuel element manufacturing procedures and inspection equipment will be exploited to reduce hot spot and hot streak factors sufficiently to permit the power upgrade without an increase in primary coolant pressure. Fresh fuel elements already fabricated for future use are being evaluated individually for power upgrade potential based on their measured coolant channel dimensions.

Rothrock, R.B.; Hale, R.E. [Oak Ridge National Lab., TN (United States); Cheverton, R.D. [Delta-21 Resources Inc., Oak Ridge, TN (United States)

1997-03-01T23:59:59.000Z

134

Framework TDR for the LHCb Upgrade Technical Design Report  

E-Print Network [OSTI]

This document is a Framework Technical Design Report for the upgrade of the LHCb experiment. It adds to the information in the Letter of Intent, in particular concerning the foreseen schedule, cost and participating institutes. Updates are given for the physics performance, based on the experience gained with the first full year of data taking, on the detector requirements and the progress of the sub-system R&D. Within the framework presented here, it is expected that the individual sub-system TDRs will follow on completion of the R&D phase in the next year.

Bediaga, I; Ferreira Rodrigues, F; Magnin, J; Massafferri, A; Nasteva, I; dos Reis, A C; Amato, S; Carvalho Akiba, K; De Paula, L; Francisco, O; Gandelman, M; Gomes, A; Lopes, J H; Otalora Goicochea, J M; Polycarpo, E; Rangel, M S; Souza De Paula, B; Vieira, D; Göbel, C; Molina Rodriguez, J; Chen, P; Gao, Y; Gong, G; Gong, H; Jing, F; Li, L; Li, Y; Liu, B; Lu, H; Shao, B; Wu, S; Xue, T; Yang, Z; Yuan, X; Zeng, M; Zhang, F; Zhang, Y; Zhong, L; De Bonis, I; Decamp, D; Drancourt, C; Ghez, Ph; Hopchev, P; Lees, J -P; Machikhiliyan, I V; Minard, M -N; Pietrzyk, B; T'Jampens, S; Tisserand, V; Tournefier, E; Vouters, G; Ajaltouni, Z; Chanal, H; Cogneras, E; Deschamps, O; El Rifai, I; Henrard, P; Hoballah, M; Jahjah Hussein, M; Lefèvre, R; Li Gioi, L; Monteil, S; Niess, V; Perret, P; Roa Romero, D A; Sobczak, K; Adrover, C; Aslanides, E; Cachemiche, J -P; Cogan, J; Duval, P -Y; Hachon, F; Khanji, B; Le Gac, R; Leroy, O; Mancinelli, G; Maurice, E; Perrin-Terrin, M; Rethore, F; Sapunov, M; Serrano, J; Tsaregorodtsev, A; Barsuk, S; Beigbeder-Beau, C; Cacérès, T; Callot, O; Charlet, D; Duarte, O; He, J; Jean-Marie, B; Kochebina, O; Lefrançois, J; Machefert, F; Martín Sánchez, A; Nicol, M; Robbe, P; Schune, M -H; Teklishyn, M; Tocut, V; Viaud, B; Videau, I; Ben-Haim, E; Benayoun, M; David, P; Del Buono, L; Martens, A; Polci, F; Brambach, T; Cauet, Ch; Deckenhoff, M; Domke, M; Ekelhof, R; Kaballo, M; Karbach, T M; Kruse, F; Merkel, J; Rudloff, K; Schleich, S; Schlupp, M; Spaan, B; Swientek, S; Warda, K; Wishahi, J; Bauer, C; Britsch, M; Föhr, C; Fontana, M; Fuchs, H; Hofmann, W; Kihm, T; Popov, D; Schmelling, M; Volyanskyy, D; Voss, H; Zavertyaev, M; Bachmann, S; Bien, A; Blouw, J; Dordei, F; Färber, C; Gersabeck, E; Hansmann-Menzemer, S; Jaeger, A; Kreplin, K; Krocker, G; Linn, C; Marks, J; Meissner, M; Nikodem, T; Seyfert, P; Stahl, S; van Tilburg, J; Uwer, U; Wandernoth, S; Wiedner, D; Zhelezov, A; Grünberg, O; Hartmann, T; Voß, C; Waldi, R; Bifani, S; Farry, S; Ilten, P; Kechadi, T; Mathe, Z; McNulty, R; Wallace, R; Zhang, W C; Milanes, D A; Palano, A; Carbone, A; D'Antone, I; Derkach, D; Falabella, A; Galli, D; Lax, I; Marconi, U; Perazzini, S; Vagnoni, V; Valenti, G; Zangoli, M; Bonivento, W; Cadeddu, S; Cardini, A; Lai, A; Manca, G; Oldeman, R; Saitta, B; Baldini, W; Bozzi, C; Evangelisti, F; Landi, L; Mazurov, A; Savrie, M; Squerzanti, S; Vecchi, S; Bizzeti, A; Frosini, M; Graziani, G; Passaleva, G; Veltri, M; Anelli, M; Archilli, F; Bencivenni, G; Campana, P; Ciambrone, P; De Simone, P; Felici, G; Lanfranchi, G; Palutan, M; Saputi, A; Sarti, A; Sciascia, B; Soomro, F; Cardinale, R; Fontanelli, F; Patrignani, C; Petrolini, A; Calvi, M; Furcas, S; Giachero, A; Gotti, C; Kucharczyk, M; Maino, M; Matteuzzi, C; Pessina, G; Carboni, G; De Capua, S; Sabatino, G; Santovetti, E; Satta, A; Alves Jr, A A; Auriemma, G; Bocci, V; Martellotti, G; Penso, G; Pinci, D; Santacesaria, R; Satriano, C; Sciubba, A; Nisar, S; Morawski, P; Polok, G; Witek, M; Muryn, B; Oblakowska-Mucha, A; Senderowska, K; Szumlak, T; Guzik, Z; Nawrot, A; Szczekowski, M; Ukleja, A; Burducea, I; Coca, C; Dogaru, M; Grecu, A; Maciuc, F; Muresan, R; Orlandea, M; Pavel-Nicorescu, C; Popovici, B; Stoica, S; Straticiuc, M; Teodorescu, E; Alkhazov, G; Bochin, B; Bondar, N; Dzyuba, A; Gets, S; Golovtsov, V; Kashchuk, A; Maev, O; Matveev, M; Sagidova, N; Shcheglov, Y; Volkov, S; Vorobyev, A; Balagura, V; Belogurov, S; Belyaev, I; Egorychev, V; Golubkov, D; Kvaratskheliya, T; Savrina, D; Semennikov, A; Shatalov, P; Shevchenko, V; Zhokhov, A; Berezhnoy, A; Bogdanova, G; Komarov, I; Korolev, M; Leflat, A; Nikitin, N; Volkov, V; Zverev, E; Filippov, S; Gushchin, E; Karavichev, O; Kravchuk, L; Kudenko, Y; Laptev, S; Tikhonov, A; Bondar, A; Eidelman, S; Krokovny, P; Kudryavtsev, V; Shekhtman, L; Vorobyev, V; Artamonov, A; Belous, K; Dzhelyadin, R; Guz, Yu; Novoselov, A; Obraztsov, V; Ostankov, A; Romanovsky, V; Shapkin, M; Stenyakin, O; Yushchenko, O; Abellan Beteta, C; Calvo Gomez, M; Camboni, A; Casajus Ramo, A; Comerma-Montells, A; Domingo Bonal, F; Garrido, L; Gascon, D; Grabalosa Gándara, M; Graciani Diaz, R; Graugés, E; Lopez Asamar, E; Mauricio, J; Mendez-Munoz, V; Pérez-Calero Yzquierdo, A; Picatoste Olloqui, E; Pie Valls, B; Potterat, C; Puig Navarro, A; Rosello, M; Ruiz, H; Vazquez Gomez, R; Vilasis-Cardona, X; Adeva, B; Alvarez Cartelle, P; Cid Vidal, X; Dosil Suárez, A; Esperante Pereira, D; Fernandez Albor, V; Gallas Torreira, A; Hernando Morata, J A; Pazos Alvarez, A; Perez Trigo, E; Plo Casasus, M; Rodriguez Perez, P; Saborido Silva, J J; Sanmartin Sedes, B; Santamarina Rios, C; Seco, M; Vazquez Regueiro, P; Visniakov, J; Albrecht, J; Alessio, F; Barschel, C; Blake, T; Bonaccorsi, E; Brarda, L; Buytaert, J; Cattaneo, M; Chadaj, B; Charpentier, Ph; Chebbi, M; Ciba, K; Clemencic, M

2012-01-01T23:59:59.000Z

135

IPNS upgrade: A feasibility study  

SciTech Connect (OSTI)

Many of Argonne National Laboratory`s (ANL`s) scientific staff members were very active in R&D work related to accelerator-based spoliation sources in the 1970s and early 1980s. In 1984, the Seitz/Eastman Panel of the National Academy of Sciences reviewed U.S. materials science research facilities. One of the recommendations of this panel was that the United States build a reactor-based steady-state source, the Advanced Neutron Source (ANS), at Oak Ridge National Laboratory. Subsequently, R&D activities related to the design of an accelerator-based source assumed a lower priority. The resumption of pulsed-source studies in this country started simultaneously with design activities in Europe aimed at the European Spallation Source (ESS). The European Community funded a workshop in September 1991 to define the parameters of the ESS. Participants in this workshop included both accelerator builders and neutron source users. A consortium of European countries has proposed to build a 5-MW pulsed source, and a feasibility study is currently under way. Soon after the birth of the ESS, a small group at ANL set about bringing themselves up to date on pulsed-source information since 1984 and studied the feasibility of upgrading ANL`s Intense Pulsed Neutron Source (IPNS) to 1 MW by means of a rapidly cycling synchrotron that could be housed, along with its support facilities, in existing buildings. In early 1993, the Kohn panel recommended that (1) design and construction of the ANS should be completed according to the proposed project schedule and (2) development of competitive proposals for cost-effective design and construction of a 1-MW pulsed spallation source should be authorized immediately.

NONE

1995-04-01T23:59:59.000Z

136

ASCR Science Network Requirements  

E-Print Network [OSTI]

1/10) needs to be moved to PPPL, the home institution of thesubsets of the data over to PPPL for smaller data analysis,

Dart, Eli

2010-01-01T23:59:59.000Z

137

ASCR Science Network Requirements  

E-Print Network [OSTI]

7 4 Argonne Leadership Computing Facility (programs include the Argonne Leadership Computing Facility (the world. ASCR has LCFs at Argonne National Laboratory and

Dart, Eli

2010-01-01T23:59:59.000Z

138

ASCR Science Network Requirements  

E-Print Network [OSTI]

next generation, high-performance computing architectures.Division. 3.2 High Performance Computing and Networkfacilities: High Performance Computing (HPC) Facility and

Dart, Eli

2010-01-01T23:59:59.000Z

139

BER Science Network Requirements  

E-Print Network [OSTI]

vulnerability. Such assessments span the natural phenomenaintegrated assessment models treat natural processes in aassessment models must be consistent with the representations of natural

Dart, Eli

2011-01-01T23:59:59.000Z

140

BER Science Network Requirements  

E-Print Network [OSTI]

global climate or Earth system models. Integrated assessmentdrive climate and Earth system model solutions. In turn,models and the full Earth system models used to simulate

Dart, Eli

2011-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

BER Science Network Requirements  

E-Print Network [OSTI]

of Energy, Office of Science, Office of Advanced Scientificthe Directors of the Office of Science, Office of Advanced5 Simulation Data Key Remote Science Drivers Instruments and

Dart, Eli

2011-01-01T23:59:59.000Z

142

ASCR Science Network Requirements  

E-Print Network [OSTI]

Computing Research, DOE Office of Science Energy SciencesDepartment of Energy, Office of Science, Office of Advancedthe Directors of the Office of Science, Office of Advanced

Dart, Eli

2010-01-01T23:59:59.000Z

143

BES Science Network Requirements  

E-Print Network [OSTI]

the Directors of the Office of Science, Office of AdvancedBasic Energy Sciences, DOE Office of Science Energy SciencesDepartment of Energy, Office of Science, Office of Advanced

Dart, Eli

2011-01-01T23:59:59.000Z

144

BES Science Network Requirements  

E-Print Network [OSTI]

in computational nanoscience, providing opportunities toby the needs of users in nanoscience research. The internalprogram and the broader nanoscience community. To understand

Dart, Eli

2011-01-01T23:59:59.000Z

145

NP Science Network Requirements  

E-Print Network [OSTI]

of the RHIC/ATLAS Computing Facility (RACF) for long-termComputing The RHIC/ATLAS Computing Facilities (RACF) aregluon plasma RHIC/ATLAS Computing Facility Research and

Dart, Eli

2013-01-01T23:59:59.000Z

146

BES Science Network Requirements  

E-Print Network [OSTI]

2 years) • Electronic structure calculations, quantum many-periodic electronic structure calculations for heteroatomwe do an electronic structure calculation on Franklin to

Dart, Eli

2011-01-01T23:59:59.000Z

147

NP Science Network Requirements  

E-Print Network [OSTI]

a small in-house nuclear physics research program by the NPnuclear physics program composed of a world-class scientific researchNuclear Physics program provides most of the Federal support for nuclear physics research

Dart, Eli

2013-01-01T23:59:59.000Z

148

NP Science Network Requirements  

E-Print Network [OSTI]

a small in-house nuclear physics research program by the NPNuclear Physics 12 Thomas Jefferson National Accelerator Facility .. 15 The ALICE Experiment . 23 CMS-HI Research Program research programs conducted by U.S. institutions in the CMS are supported by the Nuclear

Dart, Eli

2013-01-01T23:59:59.000Z

149

Beam Loss Ion Chamber System Upgrade for Experimental Halls  

SciTech Connect (OSTI)

The Beam loss Ion Chamber System (BLICS) was developed to protect Jefferson Labs transport lines, targets and beam dumps from a catastrophic ''burn through''. Range changes and testing was accomplished manually requiring the experiment to be shut down. The new upgraded system is based around an ''off the shelf'' Programmable Logic Controller located in a single control box supporting up to ten individual detectors. All functions that formerly required an entry into the experimental hall and manual adjustment can be accomplished from the Machine Control Center (MCC). A further innovation was the addition of a High Voltage ''Brick'' at the detector location. A single cable supplies the required voltage for the Brick and a return line for the ion chamber signal. The read back screens display range, trip point, and accumulated dose for each location. The new system is very cost effective and significantly reduces the amount of lost experimental time.

D.W. Dotson; D.J. Seidman

2005-05-16T23:59:59.000Z

150

Climate balance of biogas upgrading systems  

SciTech Connect (OSTI)

One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO{sub 2}.

Pertl, A., E-mail: andreas.pertl@boku.ac.a [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria); Mostbauer, P.; Obersteiner, G. [Institute of Waste Management, Department of Water, Atmosphere and Environment, University of Natural Resources and Applied Life Sciences, Vienna, Muthgasse 107, A-1190 Wien (Austria)

2010-01-15T23:59:59.000Z

151

Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Site Feedback: info@es.net About ESnet A Nationwide Platform for Science Discovery The Energy Sciences Network (ESnet) is a high-performance, unclassified national network built to...

152

Science-Driven Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Science-Driven Network Requirements for ESnet Update to the 2002 Office of Science Networking Requirements Workshop Report February 21, 2006 1-1 Science-Driven Network Requirements...

153

ATLAS upgrade June09_v3  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ATLAS efficiency and intensity upgrade ATLAS efficiency and intensity upgrade Guy Savard and Robert V. F. Janssens June 12, 2009 The ATLAS facility is on a constant quest to improve and increase the capabilities it offers to its Users. ATLAS currently provides beams of essentially all stable isotopes at energies in the vicinity of the Coulomb barrier. These can be used in conjunction with a suite of state-of-the-art instruments such as Gammasphere, the Fragment Mass Analyzer (FMA), the Canadian Penning Trap mass spectrometer (CPT), the split-pole spectrograph, an in-flight radioactive beam line, and the recently commissioned HELIOS spectrometer. At present, these capabilities are being augmented by (1) the addition of the CARIBU upgrade, which will provide low-intensity, neutron-rich radioactive beams from Californium fission fragments in both low-energy and re-

154

Instrumentation upgrades for the Macromolecular Crystallography beamlines  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Instrumentation upgrades for the Macromolecular Crystallography beamlines Instrumentation upgrades for the Macromolecular Crystallography beamlines of the Swiss Light Source Monday, October 29, 2012 - 2:00am SSRL, Bldg. 137, Rm. 322 Martin Fuchs, MX Group, Swiss Light Source; Paul Scherrer Institute (Villigen, Switzerland) A new unified diffractometer - the D3 - has been developed for the three MX beamlines. The first of the instruments is in general user operation at beamline X10SA since April 2012. The varied demands from both challenging academic research projects as well as high throughput industrial applications on today's macromolecular crystallography beamlines drive developments to both endstations and beamline optics. Recent instrumentation upgrades to the macromolecular crystallography (MX) beamlines of the Swiss Light Source therefore aimed to

155

Disruption Analysis and Response Implicattions of Passive Plates for the NSTX Upgrade  

SciTech Connect (OSTI)

The NSTX upgrade project requires analysis qualifications of existing vacuum vessel and passive stabilizing plates for increased plasma performance. Vertical stability is critically dependent on the passive conducting structure that surrounds the plasma. In this paper, the passive conducting structure is analyzed for the upgrade condition during plasma disruption to ensure the level of stress in the stabilizing plates and the fastener is within its design limits. The counter-bore of the passive plates for bolting is evaluated in details and counter-bore bushing is redesigned to prevent shear failure during disruptions as a result of high pulling and pushing forces, particularly for support at the corner bolts

Yuhu Zhai, Peter Titus, Art Brooks, and Ron Hatcher

2012-08-27T23:59:59.000Z

156

Nuclear safety procedure upgrade project at USEC/MMUS gaseous diffusion plants  

SciTech Connect (OSTI)

Martin Marietta Utility Services has embarked on a program to upgrade procedures at both of its Gaseous Diffusion Plant sites. The transition from a U.S. Department of Energy government-operated facility to U.S. Nuclear Regulatory Commission (NRC) regulated has necessitated a complete upgrade of plant operating procedures and practices incorporating human factors as well as a philosophy change in their use. This program is designed to meet the requirements of the newly written 10CFR76, {open_quotes}The Certification of Gaseous Diffusion Plants,{close_quotes} and aid in progression toward NRC certification. A procedures upgrade will help ensure increased nuclear safety, enhance plant operation, and eliminate personnel procedure errors/occurrences.

Kocsis, F.J. III

1994-12-31T23:59:59.000Z

157

LHC luminosity upgrade with large Piwinski angle scheme: a recent look  

SciTech Connect (OSTI)

Luminosity upgrade at the LHC collider using longitudinally flat bunches in combination with the large crossing angle (large Piwinski angle scheme) is being studied with renewed interest in recent years. By design, the total beam-beam tune shift at the LHC is less than 0.015 for two interaction points together. But the 2010-11 3.5 TeV collider operation and dedicated studies indicated that the beam-beam tune shift is >0.015 per interaction point. In view of this development we have revisited the requirements for the Large Piwinski Angle scheme at the LHC. In this paper we present a new set of parameters and luminosity calculations for the desired upgrade by investigating: (1) current performance of the LHC injectors, (2) e-cloud issues on nearly flat bunches and (3) realistic beam particle distributions from longitudinal beam dynamics simulations. We also make some remarks on the needed upgrades on the LHC injector accelerators.

Bhat, C.M.; /Fermilab; Zimmermann, f.; /CERN

2011-09-01T23:59:59.000Z

158

Better Buildings Neighborhood Program: Energy Upgrade California Drives  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Energy Upgrade Energy Upgrade California Drives Demand From Behind the Wheel to someone by E-mail Share Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Facebook Tweet about Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Twitter Bookmark Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Google Bookmark Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Delicious Rank Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on Digg Find More places to share Better Buildings Neighborhood Program: Energy Upgrade California Drives Demand From Behind the Wheel on

159

Missouri Water Treatment Plant Upgraded | Department of Energy  

Energy Savers [EERE]

Missouri Water Treatment Plant Upgraded Missouri Water Treatment Plant Upgraded July 13, 2010 - 11:30am Addthis The high service pumps at the St. Peters Water Treatment Plant are...

160

EECBG Success Story: Missouri Water Treatment Plant Upgraded...  

Energy Savers [EERE]

Missouri Water Treatment Plant Upgraded EECBG Success Story: Missouri Water Treatment Plant Upgraded July 13, 2010 - 11:30am Addthis The high service pumps at the St. Peters Water...

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Bio-oils Upgrading for Second Generation Biofuels  

Science Journals Connector (OSTI)

Bio-oils Upgrading for Second Generation Biofuels ... The present review is then focused on the upgrading possibilities of renewable nonedible feedstocks, obtained from biomass fast pyrolysis or liquefaction, in petroleum refineries, toward the production of second generation biofuels. ...

Inês Graça; José M. Lopes; Henrique S. Cerqueira; Maria F. Ribeiro

2012-11-21T23:59:59.000Z

162

Upgrading : an alternative approach towards housing reform in China  

E-Print Network [OSTI]

The thesis is a study on urban housing upgrading in China. The main objective is to look at upgrading, which has been widely used in many developing countries, as an alternative approach to solving the existing urban housing ...

He, Fang, 1956-

1989-01-01T23:59:59.000Z

163

EECBG Success Story: HVAC Upgrade Saving Money, Protecting History...  

Broader source: Energy.gov (indexed) [DOE]

HVAC Upgrade Saving Money, Protecting History EECBG Success Story: HVAC Upgrade Saving Money, Protecting History November 2, 2010 - 5:37pm Addthis A new heating and cooling system...

164

UPGRADE AND EVALUATION OF A LIGHTNING DETECTION SYSTEM  

E-Print Network [OSTI]

/11/2004 page 3 of 17 1 INTRODUCTION KNMI (Royal Netherlands Meteorological Institute) has upgraded itsUPGRADE AND EVALUATION OF A LIGHTNING DETECTION SYSTEM Hans Beekhuis Iwan Holleman the Netherlands

Stoffelen, Ad

165

Nuclear Materials Safeguards and Security Upgrade Project Completed...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Safeguards and Security Upgrade Project Completed Under Budget | National Nuclear Security Administration People Mission Managing the Stockpile Preventing Proliferation Powering...

166

Cost-effectiveness of conservation upgrades in manufactured homes  

SciTech Connect (OSTI)

This study addresses the costs of upgrading the efficiency of electrically heated manufactured homes in the Bonneville Power Administration's (Bonneville's) service territory. It was prepared by the Battelle Pacific Northwest Laboratory (PNL) for Bonneville under a Related Services Agreement with the US Department of Energy, Contract AC06-76RLO1830. Manufactured homes (commonly called mobile homes) represent a significant lost conservation resource in the region. Manufactured homes are required to meet national energy standards that do not reflect the recent increases in energy prices, and the preemptive nature of the national standards prevents local jurisdictions from establishing stricter requirements. Bonneville has undertaken several programs to analyze the efficiency of manufactured homes and encourage the industry to produce more efficient homes and consumers to increase their demand for efficient units. This study constitutes one portion of Bonneville's overall strategy. 45 refs.

Lee, A.D.; Conner, C.C.; Englin, J.E.; Hadley, D.L.; Lucas, R.G.; Miller, N.E.; Monroe, W.H.

1988-09-01T23:59:59.000Z

167

Work Authorization Document NSTX Upgrade Project  

E-Print Network [OSTI]

Work Authorization Document NSTX Upgrade Project Control Account #: 7900 Title: WBS 1.7.3 Title Functional Manager L. Dudek Approvals Signature Date NSTX-U Project Manager R. Strykowsky 4- WBS Dictionary procedures and documents to support the integrated tests, and to support performance of the pre

Princeton Plasma Physics Laboratory

168

MAST-Upgrade Advancing compact fusion sources  

E-Print Network [OSTI]

of innovation. It will also put the UK in a leading position to develop engineering systems for the future to the drive towards commercial fusion power. 1. Testing reactor concepts. MAST-Upgrade will be the first machine to include the Super-X divertor design, an innovative plasma exhaust system that, if successful

169

CMS: Present status, limitations, and upgrade plans  

SciTech Connect (OSTI)

An overview of the CMS upgrade plans will be presented. A brief status of the CMS detector will be given, covering some of the issues we have so far experienced. This will be followed by an overview of the various CMS upgrades planned, covering the main motivations for them, and the various R&D efforts for the possibilities under study. The CMS detector has been working extremely well since the start of data-taking at the LHC as is evidenced by the numerous excellent results published by CMS and presented at this workshop and recent conferences. Less well documented are the various issues that have been encountered with the detector. In the spirit of this workshop I will cover some of these issues with particular emphasis on problems that motivate some of the upgrades to the CMS detector for this decade of data-taking. Though the CMS detector has been working extremely well and expectations are great for making the most of the LHC luminosity, there have been a number of issues encountered so far. Some of these have been described and while none currently presents a problem for physics performance, some of them are expected to become more problematic, especially at the highest Phase 1 luminosities for which the majority of the integrated luminosity will be collected. These motivate upgrades for various parts of the CMS detector so that the current excellent physics performance can be maintained or even surpassed in the realm of the highest Phase 1 luminosities.

Cheung, H.W.K.; /Fermilab; ,

2011-09-01T23:59:59.000Z

170

Financing Energy Upgrades for K-12 School Districts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Financing Energy Upgrades for K-12 School Districts Financing Energy Upgrades for K-12 School Districts Page 2 Table of Contents Introduction................................................................................................................................................................................................................... 4 What This Guide Covers .................................................................................................................................................................................. 6 Chapter 1: Principles of Financing Energy Upgrades for Schools .................................................................................................. 7 Principle 1. Start with Clear Project Objectives.......................................................................................................................................... 7

171

STAR Vertex Detector Upgrade Development  

SciTech Connect (OSTI)

We report on the development and prototyping efforts undertaken with the goal of producing a micro-vertex detector for the STAR experiment at the RHIC accelerator at BNL. We present the basic detector requirements and show a sensor development path, conceptual mechanical design candidates and readout architecture. Prototyping and beam test results with current generation MimoSTAR-2 sensors and a readout system featuring FPGA based on-the-fly hit finding and data sparsification are also presented.

Greiner, Leo C.; Matis, Howard S.; Stezelberger, Thorsten; Vu,Chinh Q.; Wieman, Howard; Szelezniak, Michal; Sun, Xiangming

2008-01-28T23:59:59.000Z

172

Upgrade of CEBAF from 6 Gev To 12 Gev: Status  

SciTech Connect (OSTI)

The CEBAF accelerator is being upgraded from 6 GeV to 12 GeV by the US Department of Energy. The accelerator upgrade is being done within the existing tunnel footprint. The accelerator upgrade includes: 10 new srfbased high-performance cryomodules plus RF systems, doubling the 2K helium plant's capability, upgrading the existing beamlines to operate at nearly double the original performance envelope, and adding a beamline to a new experimental area. Construction is over 75% complete with final completion projected for late FY13. Details of the upgrade and status of the work will be presented.

Harwood, Leigh [Jefferson Lab, 12000 Jefferson Ave, Newport News, VA, 23606 (United States)

2013-04-19T23:59:59.000Z

173

Energy Star Building Upgrade Value Calculator | Open Energy Information  

Open Energy Info (EERE)

Energy Star Building Upgrade Value Calculator Energy Star Building Upgrade Value Calculator Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Energy Star Building Upgrade Value Calculator (for Office Properties) Agency/Company /Organization: ENERGY STAR Phase: "Evaluate Options and Determine Feasibility" is not in the list of possible values (Bring the Right People Together, Create a Vision, Determine Baseline, Evaluate Options, Develop Goals, Prepare a Plan, Get Feedback, Develop Finance and Implement Projects, Create Early Successes, Evaluate Effectiveness and Revise as Needed) for this property. User Interface: Spreadsheet Website: www.energystar.gov/index.cfm?c=comm_real_estate.building_upgrade_value The Building Upgrade Value Calculator allows practitioners to analyze the

174

Membership Criteria: Better Buildings Residential network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Criteria Criteria BETTER BUILDINGS RESIDENTIAL NETWORK Learn more at betterbuildings.energy.gov/bbrn Better Buildings Residential Network (BBRN) members must be supportive of residential energy efficiency and the mission of the BBRN. Members are expected to be legally incorporated organizations or institutions, rather than individuals, actively engaged in the field of existing residential building energy efficiency with an ability to impact the market. Members should have the ability and capacity to carry out the requirements for membership (i.e., reporting the annual number of upgrades in their sphere of influence, and associated benefits), and actively engage as a member. Members must actively engage in significant work supporting, studying, researching, reporting, and/or

175

ATU Advanced Technology Upgrading Ltd | Open Energy Information  

Open Energy Info (EERE)

ATU Advanced Technology Upgrading Ltd ATU Advanced Technology Upgrading Ltd Jump to: navigation, search Name ATU (Advanced Technology Upgrading) Ltd Place Israel Product Focused on development of rechargeable magnesium battery. References ATU (Advanced Technology Upgrading) Ltd[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. ATU (Advanced Technology Upgrading) Ltd is a company located in Israel . References ↑ "ATU (Advanced Technology Upgrading) Ltd" Retrieved from "http://en.openei.org/w/index.php?title=ATU_Advanced_Technology_Upgrading_Ltd&oldid=342420" Categories: Clean Energy Organizations Companies Organizations Stubs What links here Related changes Special pages Printable version

176

An Upgrade Proposal from the PHENIX Collaboration  

E-Print Network [OSTI]

In this document the PHENIX collaboration proposes a major upgrade to the PHENIX detector at the Relativistic Heavy Ion Collider. This upgrade, sPHENIX, enables an extremely rich jet and beauty quarkonia physics program addressing fundamental questions about the nature of the strongly coupled quark-gluon plasma (QGP), discovered experimentally at RHIC to be a perfect fluid. The startling dynamics of the QGP on fluid-like length scales is an emergent property of quantum chromodynamics (QCD), seemingly implicit in the Lagrangian but stubbornly hidden from view. QCD is an asymptotically free theory, but how QCD manifests as a strongly coupled fluid with specific shear viscosity near $T_C$, as low as allowed by the uncertainty principle, is as fundamental an issue as that of how confinement itself arises.

Adare, A; Aidala, C; Ajitanand, N N; Akiba, Y; Akimoto, R; Alexander, J; Aoki, K; Apadula, N; Asano, H; Atomssa, E T; Awes, T C; Azmoun, B; Babintsev, V; Bai, M; Bai, X; Bandara, N; Bannier, B; Barish, K N; Baron, O; Bassalleck, B; Bathe, S; Baublis, V; Baumgart, S; Bazilevsky, A; Beaumier, M; Beckman, S; Belmont, R; Benjamin, G; Berdnikov, A; Berdnikov, Y; Blackburn, J; Blau, D S; Bobrek, M; Bok, J; Boose, S; Boyle, K; Britton,, C L; Brooks, M L; Bryslawskyj, J; Bumazhnov, V; Butler, C; Butsyk, S; Campbell, S; Carollo, A; Chai, J -S; Chen, C -H; Chernichenko, S; Chi, C Y; Chiu, M; Choi, I J; Choi, J B; Choi, S; Chollet, S; Christiansen, P; Chujo, T; Cianciolo, V; Citron, Z; Cole, B A; Cronin, N; Crossett, N; Csanád, M; D'Orazio, L; Dairaku, S; Danley, D; Datta, A; Daugherity, M S; David, G; DeBlasio, K; Debraine, A; Dehmelt, K; Denisov, A; Deshpande, A; Desmond, E J; Dietzsch, O; Ding, L; Dion, A; Diss, P B; Do, J H; Donadelli, M; Drapier, O; Drees, A; Drees, K A; Durham, J M; Durum, A; Eberle, L; Efremenko, Y V; Engelmore, T; Enokizono, A; Esumi, S; Eyser, K O; Fadem, B; Feege, N; Fields, D E; Finger, M; FingerJr., M; Fleuret, F; Fokin, S L; Frantz, J E; Franz, A; Frawley, A D; Fukao, Y; Fusayasu, T; Gainey, K; Gal, C; Gallus, P; Garg, P; Garishvili, A; Garishvili, I; Gastaldi, F; Ge, H; Giannotti, P; Giordarno, F; Glenn, A; Gong, X; Gonin, M; Goto, Y; de Cassagnac, R Granier; Grau, N; Greene, S V; Perdekamp, M Grosse; Gu, Y; Gunji, T; Guragain, H; Hachiya, T; Haggerty, J S; Hahn, K I; Hamagaki, H; Hamilton, H F; Han, S Y; Hanks, J; Hasegawa, S; Haseler, T O S; Hashimoto, K; Hayano, R; Hayashi, S; He, X; Hemmick, T K; Hester, T; Hill, J C; Hoefferkamp, M; Hollis, R S; Homma, K; Hong, B; Hori, Y; Hoshino, T; Huang, J; Huang, S; Hutchins, J R; Ichihara, T; Ikeda, Y; Imai, K; Imazu, Y; Imrek, J; Inaba, M; Iordanova, A; Isenhower, D; Isinhue, A; Isupov, A; Ivanischev, D; Ivanov, V; Jacak, B V; Jeon, S J; Jezghani, M; Jia, J; Jiang, X; Johnson, B M; Joo, K S; Jouan, D; Jumper, D S; Kamin, J; Kanda, S; Kang, B H; Kang, J H; Kang, J S; Kapustinsky, J; Karatsu, K; Kawall, D; Kazantsev, A V; Kehayias, H -J; Key, J A; Khachatryan, V; Khandai, P K; Khanzadeev, A; Kijima, K M; Kim, C; Kim, D H; Kim, D J; Kim, E -J; Kim, H J; Kim, K -B; Kim, M; Kim, Y -J; Kim, Y K; Kimelman, B; Kiss, Á; Kistenev, E; Kitamura, R; Klatsky, J; Kleinjan, D; Kline, P; Koblesky, T; Kochenda, L; Kofarago, M; Komatsu, Y; Komkov, B; Koster, J; Kotchetkov, D; Kotov, D; Kravtsov, P; Krizek, F; Kurita, K; Kuriyama, M; Kurosawa, M; Kwon, Y; Lacey, R; Lai, Y S; Lajoie, J G; Lebedev, A; Lee, G H; Lee, J; Lee, K B; Lee, K S; Lee, S; Lee, S H; Lefferts, R; Leitch, M J; Leite, M A L; Leitgab, M; Lewis, B; Li, X; Lim, S H; Lipski, A; Litvinenko, A; Liu, M X; Love, B; Lynch, D; Lynch, M; Maguire, C F; Makdisi, Y I; Makek, M; Malakhov, A; Manion, A; Manko, V I; Mannel, E; Maruyama, T; Masumoto, S; McCumber, M; McGaughey, P L; McGlinchey, D; McKay, R; McKinney, C; Meles, A; Mendoza, M; Menegasso, R; Meredith, B; Miake, Y; Mibe, T; Mignerey, A C; Milov, A; Mishra, D K; Mitchell, J T; Miyasaka, S; Mizuno, S; Mohanty, A K; Montuenga, P; Moon, T; Morrison, D P; Moskowitz, M; Motschwiller, S; Moukhanova, T V; Murakami, T; Murata, J; Mwai, A; Nagae, T; Nagamiya, S; Nagashima, K; Nagle, J L; Nagy, M I; Nakagawa, I; Nakagomi, H; Nakamiya, Y; Nakamura, K R; Nakamura, T; Nakano, K; Nattrass, C; Nederlof, A; Netrakanti, P K; Nihashi, M; Niida, T; Ninomiya, K; Nishimura, S; Northacker, D; Nouicer, R; Novak, T; Novitzky, N; Nukariya, A; Nyanin, A S; O'Brien, E; Ogilvie, C A; Oide, H; Okada, K; Koop, J D Orjuela; Osborn, J D; Oskarsson, A; Österman, L; Ozawa, K; Pancake, C; Pantuev, V; Papavassiliou, V; Park, I H; Park, J S; Park, S; Park, S K; Pate, S F; Patel, L; Patel, M; Peng, J -C; Perepelitsa, D; Perera, G D N; Peresedov, V; Peressounko, D Yu; Perry, J; Petti, R; Pinkenburg, C; Pinson, R; Pisani, R P; Popule, J; Purschke, M L; Qu, H; Radhakrishnan, S; Rak, J; Ramson, B J; Ravinovich, I; Read, K F; Reynolds, D; Reynolds, R; Riabov, V; Riabov, Y; Richardson, E; Rinn, T; Riveli, N; Roach, D; Rolnick, S D; Rosati, M; Roschin, E; Rowan, Z; Rubin, J G; Rukoyatkin, P; Ryu, M S; Safonov, A; Sahlmueller, B; Saito, N; Sakaguchi, T; Sako, H; Samsonov, V; Sano, M; Sarsour, M; Sato, S; Sawada, S; Schaefer, B; Schmoll, B K; Sedgwick, K; Seele, J; Seidl, R; Sekiguchi, Y; Sen, A; Seto, R; Sett, P; Sexton, A; Shafto, E; Sharma, D; Shaver, A; Shein, I; Shibata, T -A; Shigaki, K; Shimomura, M; Shoji, K; Shukla, P; Sicho, P; Sickles, A; Silva, C L; Silvermyr, D; Singh, B K; Singh, C P; Singh, V; Sippach, F W; Skolnik, M; Snowball, M; Solano, S; Soldatov, A; Soltz, R A; Sondheim, W E; Sorensen, S P; Soumya, M; Sourikova, I V; Stankus, P W; Steinberg, P; Stenlund, E; Stepanov, M; Ster, A; Stevens, L; Stoll, S P; Stone, M R; Sugitate, T; Sukhanov, A; Sumita, T; Sun, J; Sziklai, J; Takagui, E M

2015-01-01T23:59:59.000Z

177

CHALLENGES FOR THE SNS RING ENERGY UPGRADE  

SciTech Connect (OSTI)

The Oak Ridge Spallation Neutron Source accumulator ring presently operates at a beam power of about 1 MW with a beam energy of about 910 MeV. A power upgrade is planned to increase the beam energy to 1.3 GeV. For the accumulator ring this mostly involves modifications to the injection and extraction sections. A variety of modifications to the existing injection section were necessary to achieve 1 MW, and the tools developed and the lessons learned from this work are now being applied to the design of the new injection section. This paper will discuss the tools and the lessons learned, and also present the design and status of the upgrades to the accumulator ring.

Plum, Michael A [ORNL; Gorlov, Timofey V [ORNL; Holmes, Jeffrey A [ORNL; Hunter, W Ted [ORNL; Roseberry, Jr., R Tom [ORNL; Wang, Jian-Guang [ORNL

2012-01-01T23:59:59.000Z

178

An Upgrade Proposal from the PHENIX Collaboration  

E-Print Network [OSTI]

In this document the PHENIX collaboration proposes a major upgrade to the PHENIX detector at the Relativistic Heavy Ion Collider. This upgrade, sPHENIX, enables an extremely rich jet and beauty quarkonia physics program addressing fundamental questions about the nature of the strongly coupled quark-gluon plasma (QGP), discovered experimentally at RHIC to be a perfect fluid. The startling dynamics of the QGP on fluid-like length scales is an emergent property of quantum chromodynamics (QCD), seemingly implicit in the Lagrangian but stubbornly hidden from view. QCD is an asymptotically free theory, but how QCD manifests as a strongly coupled fluid with specific shear viscosity near $T_C$, as low as allowed by the uncertainty principle, is as fundamental an issue as that of how confinement itself arises.

A. Adare; S. Afanasiev; C. Aidala; N. N. Ajitanand; Y. Akiba; R. Akimoto; J. Alexander; K. Aoki; N. Apadula; H. Asano; E. T. Atomssa; T. C. Awes; B. Azmoun; V. Babintsev; M. Bai; X. Bai; N. Bandara; B. Bannier; K. N. Barish; O. Baron; B. Bassalleck; S. Bathe; V. Baublis; S. Baumgart; A. Bazilevsky; M. Beaumier; S. Beckman; R. Belmont; G. Benjamin; A. Berdnikov; Y. Berdnikov; J. Blackburn; D. S. Blau; M. Bobrek; J. Bok; S. Boose; K. Boyle; C. L. Britton, Jr.; M. L. Brooks; J. Bryslawskyj; V. Bumazhnov; C. Butler; S. Butsyk; S. Campbell; A. Carollo; J. -S. Chai; C. -H. Chen; S. Chernichenko; C. Y. Chi; M. Chiu; I. J. Choi; J. B. Choi; S. Choi; S. Chollet; P. Christiansen; T. Chujo; V. Cianciolo; Z. Citron; B. A. Cole; N. Cronin; N. Crossett; M. Csanád; L. D'Orazio; S. Dairaku; D. Danley; A. Datta; M. S. Daugherity; G. David; K. DeBlasio; A. Debraine; K. Dehmelt; A. Denisov; A. Deshpande; E. J. Desmond; O. Dietzsch; L. Ding; A. Dion; P. B. Diss; J. H. Do; M. Donadelli; O. Drapier; A. Drees; K. A. Drees; J. M. Durham; A. Durum; L. Eberle; Y. V. Efremenko; T. Engelmore; A. Enokizono; S. Esumi; K. O. Eyser; B. Fadem; N. Feege; D. E. Fields; M. Finger; M. FingerJr.; F. Fleuret; S. L. Fokin; J. E. Frantz; A. Franz; A. D. Frawley; Y. Fukao; T. Fusayasu; K. Gainey; C. Gal; P. Gallus; P. Garg; A. Garishvili; I. Garishvili; F. Gastaldi; H. Ge; P. Giannotti; F. Giordarno; A. Glenn; X. Gong; M. Gonin; Y. Goto; R. Granier de Cassagnac; N. Grau; S. V. Greene; M. Grosse Perdekamp; Y. Gu; T. Gunji; H. Guragain; T. Hachiya; J. S. Haggerty; K. I. Hahn; H. Hamagaki; H. F. Hamilton; S. Y. Han; J. Hanks; S. Hasegawa; T. O. S. Haseler; K. Hashimoto; R. Hayano; S. Hayashi; X. He; T. K. Hemmick; T. Hester; J. C. Hill; M. Hoefferkamp; R. S. Hollis; K. Homma; B. Hong; Y. Hori; T. Hoshino; J. Huang; S. Huang; J. R. Hutchins; T. Ichihara; Y. Ikeda; K. Imai; Y. Imazu; J. Imrek; M. Inaba; A. Iordanova; D. Isenhower; A. Isinhue; A. Isupov; D. Ivanischev; V. Ivanov; B. V. Jacak; S. J. Jeon; M. Jezghani; J. Jia; X. Jiang; B. M. Johnson; K. S. Joo; D. Jouan; D. S. Jumper; J. Kamin; S. Kanda; B. H. Kang; J. H. Kang; J. S. Kang; J. Kapustinsky; K. Karatsu; D. Kawall; A. V. Kazantsev; H. -J. Kehayias; J. A. Key; V. Khachatryan; P. K. Khandai; A. Khanzadeev; K. M. Kijima; C. Kim; D. H. Kim; D. J. Kim; E. -J. Kim; H. J. Kim; K. -B. Kim; M. Kim; Y. -J. Kim; Y. K. Kim; B. Kimelman; Á. Kiss; E. Kistenev; R. Kitamura; J. Klatsky; D. Kleinjan; P. Kline; T. Koblesky; L. Kochenda; M. Kofarago; Y. Komatsu; B. Komkov; J. Koster; D. Kotchetkov; D. Kotov; P. Kravtsov; F. Krizek; K. Kurita; M. Kuriyama; M. Kurosawa; Y. Kwon; R. Lacey; Y. S. Lai; J. G. Lajoie; A. Lebedev; G. H. Lee; J. Lee; K. B. Lee; K. S. Lee; S. Lee; S. H. Lee; R. Lefferts; M. J. Leitch; M. A. L. Leite; M. Leitgab; B. Lewis; X. Li; S. H. Lim; A. Lipski; A. Litvinenko; M. X. Liu; B. Love; D. Lynch; M. Lynch; C. F. Maguire; Y. I. Makdisi; M. Makek; A. Malakhov; A. Manion; V. I. Manko; E. Mannel; T. Maruyama; S. Masumoto; M. McCumber; P. L. McGaughey; D. McGlinchey; R. McKay; C. McKinney; A. Meles; M. Mendoza; R. Menegasso; B. Meredith; Y. Miake; T. Mibe; A. C. Mignerey; A. Milov; D. K. Mishra; J. T. Mitchell; S. Miyasaka; S. Mizuno; A. K. Mohanty; P. Montuenga; T. Moon; D. P. Morrison; M. Moskowitz; S. Motschwiller; T. V. Moukhanova; T. Murakami; J. Murata; A. Mwai; T. Nagae; S. Nagamiya; K. Nagashima; J. L. Nagle; M. I. Nagy; I. Nakagawa; H. Nakagomi; Y. Nakamiya; K. R. Nakamura; T. Nakamura; K. Nakano; C. Nattrass; A. Nederlof; P. K. Netrakanti; M. Nihashi; T. Niida; K. Ninomiya; S. Nishimura; D. Northacker; R. Nouicer; T. Novak; N. Novitzky; A. Nukariya; A. S. Nyanin; E. O'Brien; C. A. Ogilvie; H. Oide; K. Okada; J. D. Orjuela Koop; J. D. Osborn; A. Oskarsson; L. Österman; K. Ozawa; C. Pancake; V. Pantuev; V. Papavassiliou; I. H. Park; J. S. Park; S. Park; S. K. Park; S. F. Pate; L. Patel; M. Patel; J. -C. Peng; D. Perepelitsa; G. D. N. Perera; V. Peresedov; D. Yu. Peressounko; J. Perry; R. Petti; C. Pinkenburg; R. Pinson; R. P. Pisani; J. Popule; M. L. Purschke; H. Qu; S. Radhakrishnan; J. Rak; B. J. Ramson; I. Ravinovich; K. F. Read; D. Reynolds; R. Reynolds; V. Riabov; Y. Riabov; E. Richardson; T. Rinn; N. Riveli; D. Roach; S. D. Rolnick; M. Rosati; E. Roschin; Z. Rowan; J. G. Rubin; P. Rukoyatkin; M. S. Ryu; A. Safonov; B. Sahlmueller; N. Saito; T. Sakaguchi; H. Sako; V. Samsonov; M. Sano; M. Sarsour; S. Sato; S. Sawada; B. Schaefer; B. K. Schmoll; K. Sedgwick; J. Seele; R. Seidl; Y. Sekiguchi; A. Sen; R. Seto; P. Sett; A. Sexton; E. Shafto; D. Sharma; A. Shaver; I. Shein; T. -A. Shibata; K. Shigaki; M. Shimomura; K. Shoji; P. Shukla; P. Sicho; A. Sickles; C. L. Silva; D. Silvermyr; B. K. Singh; C. P. Singh; V. Singh; F. W. Sippach; M. Skolnik; M. Snowball; S. Solano; A. Soldatov; R. A. Soltz; W. E. Sondheim; S. P. Sorensen; M. Soumya; I. V. Sourikova; P. W. Stankus

2015-01-25T23:59:59.000Z

179

Proposal to upgrade the MIPP experiment  

SciTech Connect (OSTI)

The upgraded MIPP physics results are needed for the support of NuMI projects, atmospheric cosmic ray and neutrino programs worldwide and will permit a systematic study of non-perturbative QCD interactions. The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and {approx} 20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost scheme of upgrading the MIPP data acquisition speed to 3000 Hz. This will also enable us to measure the medium energy numi target to be used for the NOvA/MINERvA experiments. We outline the capabilities of the upgraded MIPP detector to obtain high statistics particle production data on a number of nuclei that will help towards the understanding and simulation of hadronic showers in matter. Measurements of nitrogen cross sections will permit a better understanding of cosmic ray shower systematics in the atmosphere. In addition, we explore the possibilities of providing tagged neutral beams using the MIPP spectrometer that may be crucial for validating the Particle Flow Algorithm proposed for calorimeters for the International Linear Collider detectors. Lastly, we outline the physics potential of such a detector in understanding non-perturbative QCD processes.

Isenhower, D.; Sadler, M.; Towell, R.; Watson, S.; /Abilene Christian U.; Peterson, R.J.; /Colorado U.; Baker, W.; Carey, D.; Christian, D.; Demarteau, M.; Jensen, D.; Johnstone, C.; Meyer, H.; Raja, R.; Ronzhin, A.; Solomey, N.; Wester, W.; /Fermilab; Gutbrod, H.; Peters, K.; /Darmstadt, GSI; Feldman, G.; /Harvard U.; Torun, Y.; /IIT, Chicago; Messier, M.D.; /Indiana U. /Iowa U. /Dubna, JINR /Kent State U. /Groningen, KVI /Michigan U. /St. Petersburg, INP /Purdue U. /South Carolina U. /Virginia U. /Wisconsin U., Madison

2006-09-01T23:59:59.000Z

180

Upgrades to Monteburns, version 3.0  

SciTech Connect (OSTI)

Monteburns, a Monte Carlo burnup code which has the flexibility to model time-dependent isotopic changes for a variety of nuclear systems by linking the neutron transport code MCNP/X to a production/depletion code, has undergone several performance upgrades recently that have increased the code's capabilities. Once limited to a specific number of regions, enhancements have been implemented that afford a much greater number of burn materials, such that users will be more limited by the physical constraints of their computing environment as opposed to inherent limits built into the coding of Monteburns. In conjunction with the increase in the number of burn materials, parallel execution of a production/depletion code of choice has been implemented, such that users have the option of using CINDER90, 0RIGEN2, or the newly released version of ORIGEN. Finally, the recoverable energy per fission calculation was upgraded to include capture gamma energy deposited in all specified materials as a function of irradiation time. The sum of the prompt and delayed recoverable energies from fission was obtained as before. These upgrades were first tested on a rigorous 1/8 core model of a Pressurized Water Reactor with fresh, once- and twice-burned fuel. We can now model several orders of magnitude more materials using Monte Carlo techniques, which is a significant advance in the reactor modeling world. (authors)

Galloway, J. D.; Trellue, H. R. [Los Alamos National Laboratory, 30 Bikini Atoll Rd., Los Alamos, NM 87545-0001 (United States)

2012-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Upgrade of the cryogenic CERN RF test facility  

SciTech Connect (OSTI)

With the large number of superconducting radiofrequency (RF) cryomodules to be tested for the former LEP and the present LHC accelerator a RF test facility was erected early in the 1990’s in the largest cryogenic test facility at CERN located at Point 18. This facility consisted of four vertical test stands for single cavities and originally one and then two horizontal test benches for RF cryomodules operating at 4.5 K in saturated helium. CERN is presently working on the upgrade of its accelerator infrastructure, which requires new superconducting cavities operating below 2 K in saturated superfluid helium. Consequently, the RF test facility has been renewed in order to allow efficient cavity and cryomodule tests in superfluid helium and to improve its thermal performances. The new RF test facility is described and its performances are presented.

Pirotte, O.; Benda, V.; Brunner, O.; Inglese, V.; Maesen, P.; Vullierme, B. [CERN - European Organization for Nuclear Research, CH-1211 Geneva 23 (Switzerland); Koettig, T. [ESS - European Spallation Source, Box 176, 221 00 Lund (Sweden)

2014-01-29T23:59:59.000Z

182

ATLAS Upgrades Towards the High Luminosity LHC: extending the discovery potential  

E-Print Network [OSTI]

After successful LHC operation at the center-of-mass energy of 7 and 8 TeV in 2011 and 2012, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity levelling. The final goal is to extend the data set from about few hundred fb-1 expected for LHC running to 3000 fb-1 by around 2030. Current planning in ATLAS also has significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades to accommodate running already beyond nominal luminosity this decade. The challenge of coping with HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for an all-new inner-tracker, significant upgrades in the calorimeter and muon systems, as well as improved triggers and data acqui...

Cinca, D; The ATLAS collaboration

2014-01-01T23:59:59.000Z

183

Innovative Technology Improves Upgrading Process for Unconventional Oil  

Broader source: Energy.gov (indexed) [DOE]

Innovative Technology Improves Upgrading Process for Unconventional Innovative Technology Improves Upgrading Process for Unconventional Oil Resources Innovative Technology Improves Upgrading Process for Unconventional Oil Resources April 9, 2013 - 1:57pm Addthis Washington, DC - An innovative oil-upgrading technology that can increase the economics of unconventional petroleum resources has been developed under a U.S. Department of Energy -funded project. The promising technology, developed by Ceramatec of Salt Lake City, Utah, and managed by the Office of Fossil Energy's National Energy Technology Laboratory, has been licensed to Western Hydrogen of Calgary for upgrading bitumen or heavy oil from Canada. A new company, Field Upgrading (Calgary, Alberta), has been formed dedicated to developing and commercializing the technology.

184

County Aims to Save with Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

County Aims to Save with Upgrades County Aims to Save with Upgrades County Aims to Save with Upgrades August 5, 2010 - 6:50pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy Fulton County, Georgia is an example of how large-scale energy upgrades can save local governments millions of dollars and develop a new green workforce. A retrofit program, funded by an $814,300 Energy Efficiency and Conservation Block Grant (EECBG) through the American Recovery and Reinvestment Act, was the topic of a recent video. Under the program, more than a dozen county facilities are being upgraded with equipment such as occupancy sensors, digital thermostats and LED exit signs. County workers will also be trained on how to conduct the upgrades and keep buildings energy efficient.

185

Energy Efficiency Upgrades: Benefiting Homeowners and the Environment |  

Broader source: Energy.gov (indexed) [DOE]

Upgrades: Benefiting Homeowners and the Upgrades: Benefiting Homeowners and the Environment Energy Efficiency Upgrades: Benefiting Homeowners and the Environment May 10, 2013 - 4:37pm Addthis Energy efficient upgrades helped Margie Garmey save money while reducing her impact on the planet. | Photo courtesy of Margie Garmey. Energy efficient upgrades helped Margie Garmey save money while reducing her impact on the planet. | Photo courtesy of Margie Garmey. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs Looking for ways to save energy? Learn how to do a DIY home energy audit to help you identify and prioritize some energy efficiency upgrades. Check out Energy Saver for tips and advice on ways to save energy and money. When Margie Garmey and her partner bought their newly constructed two-story

186

County Aims to Save with Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Aims to Save with Upgrades Aims to Save with Upgrades County Aims to Save with Upgrades August 5, 2010 - 6:50pm Addthis Paul Lester Communications Specialist, Office of Energy Efficiency and Renewable Energy Fulton County, Georgia is an example of how large-scale energy upgrades can save local governments millions of dollars and develop a new green workforce. A retrofit program, funded by an $814,300 Energy Efficiency and Conservation Block Grant (EECBG) through the American Recovery and Reinvestment Act, was the topic of a recent video. Under the program, more than a dozen county facilities are being upgraded with equipment such as occupancy sensors, digital thermostats and LED exit signs. County workers will also be trained on how to conduct the upgrades and keep buildings energy efficient.

187

TA-55 Final Safety Analysis Report Comparison Document and DOE Safety Evaluation Report Requirements  

SciTech Connect (OSTI)

This document provides an overview of changes to the currently approved TA-55 Final Safety Analysis Report (FSAR) that are included in the upgraded FSAR. The DOE Safety Evaluation Report (SER) requirements that are incorporated into the upgraded FSAR are briefly discussed to provide the starting point in the FSAR with respect to the SER requirements.

Alan Bond

2001-04-01T23:59:59.000Z

188

Methods and apparatuses for preparing upgraded pyrolysis oil  

DOE Patents [OSTI]

Methods and apparatuses for preparing upgraded pyrolysis oil are provided herein. In an embodiment, a method of preparing upgraded pyrolysis oil includes providing a biomass-derived pyrolysis oil stream having an original oxygen content. The biomass-derived pyrolysis oil stream is hydrodeoxygenated under catalysis in the presence of hydrogen to form a hydrodeoxygenated pyrolysis oil stream comprising a cyclic paraffin component. At least a portion of the hydrodeoxygenated pyrolysis oil stream is dehydrogenated under catalysis to form the upgraded pyrolysis oil.

Brandvold, Timothy A; Baird, Lance Awender; Frey, Stanley Joseph

2013-10-01T23:59:59.000Z

189

List of Steam-system upgrades Incentives | Open Energy Information  

Open Energy Info (EERE)

upgrades Incentives upgrades Incentives Jump to: navigation, search The following contains the list of 100 Steam-system upgrades Incentives. CSV (rows 1 - 100) Incentive Incentive Type Place Applicable Sector Eligible Technologies Active AlabamaSAVES Revolving Loan Program (Alabama) State Loan Program Alabama Commercial Industrial Institutional Building Insulation Doors Energy Mgmt. Systems/Building Controls Lighting Lighting Controls/Sensors Steam-system upgrades Water Heaters Windows Biodiesel Biomass CHP/Cogeneration Ethanol Fuel Cells using Renewable Fuels Geothermal Electric Hydroelectric energy Landfill Gas Photovoltaics Renewable Fuels Solar Water Heat Commercial Refrigeration Equipment Natural Gas Yes Ameren Missouri (Gas) - Business Energy Efficiency Program (Missouri) Utility Rebate Program Missouri Commercial

190

Employee-Focused Structure Helps Produce Upgrades for Contractor...  

Energy Savers [EERE]

Progressive Energy Solutions around three pillars: employee ownership; development of energy efficiency best practices; and superior energy upgrade work. "We all have a real...

191

Office of Energy Policy and Systems Analysis Site Upgrade  

Broader source: Energy.gov [DOE]

Office of Energy Policy and Systems Analysis site is currently being upgraded to better serve on audience. Please check back shortly.

192

EECBG Success Story: County Partners with Siemens on Energy Upgrades...  

Office of Environmental Management (EM)

Block Grant (EECBG) to develop projects including a solar photovoltaic energy system, LED lighting at municipal buildings, boiler upgrades, energy efficiency retrofits at the...

193

Community based outreach strategies in residential energy upgrade programs  

E-Print Network [OSTI]

Home energy upgrades can reduce residential energy consumption and improve indoor conditions, thereby realizing environmental, economic, health and other social benefits. Utilities, government and other actors have established ...

McEwen, Brendan (Brendan Carl Francis)

2012-01-01T23:59:59.000Z

194

Conversion Technologies for Advanced Biofuels ? Bio-Oil Upgrading  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of bio-oils. Focus on process development activities and underlying science for biofuels production. Bio-oil Upgrading - Presenter Information Energy Efficiency & Renewable...

195

THREE VIRGINIA PROGRAMS OVERCOME BARRIERS TO UPGRADES | Department...  

Energy Savers [EERE]

upgrades. RREA used a home energy makeover contest to educate homeowners and drive demand. RREA also engaged faith-based institutions and neighborhood associations in its...

196

New Science on the Horizon as Upgraded Particle Accelerator Meets...  

Office of Science (SC) Website

New Science on the Horizon as Upgraded Particle Accelerator Meets Commissioning Milestones Nuclear Physics (NP) NP Home About Research Facilities Science Highlights Benefits of NP...

197

Jefferson Lab's upgraded Free-Electron Laser produces first ligh...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

upgraded Free-Electron Laser produces first light June 18, 2003 Researchers at the U.S. Department of Energy's Thomas Jefferson National Accelerator Facility have produced first...

198

Upgrading of Pitch Produced by Mild Gasification of Subbituminous Cal  

Science Journals Connector (OSTI)

Upgrading of Pitch Produced by Mild Gasification of Subbituminous Cal ... Structural Characterization of Coal Tar Pitches Obtained by Heat Treatment under Different Conditions ...

Robert L. McCormick; Mahesh C. Jha

1994-03-01T23:59:59.000Z

199

EA-1190: Wastewater Treatment Capability Upgrade, Amarillo, Texas  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts for the proposed upgrade of the U.S. Department of Energy Pantex Plant Wastewater Treatment Plant in Amarillo, Texas.

200

PHOENIX ENERGIZES LIGHT RAIL CORRIDOR WITH UPGRADES | Department...  

Energy Savers [EERE]

duct sealing; heating, ventilation, and air conditioning (HVAC) upgrades; sunscreens; and solar water heaters. Energize Phoenix eventually expanded its service area beyond the...

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange...  

Broader source: Energy.gov (indexed) [DOE]

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities: Best Management Practice Case Study 11: Commercial Kitchen Equipment (Brochure), Federal Energy...

202

Ribbon cutting marks chemistry laboratory upgrades at Northern...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico College Community Connections: Your link to news and opportunities from Los Alamos National Laboratory...

203

Bedford Energizes Other Communities to Upgrade | Department of...  

Energy Savers [EERE]

program and completed energy efficiency upgrades in their own homes, the rate of project completion was more than double the average of that across all participating...

204

Plains & Eastern Clean Line Project Proposal for New or Upgraded...  

Office of Environmental Management (EM)

Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project...

205

The value of steam turbine upgrades  

SciTech Connect (OSTI)

Technological advances in mechanical and aerodynamic design of the turbine steam path are resulting in higher reliability and efficiency. A recent study conducted on a 390 MW pulverized coal-fired unit revealed just how much these new technological advancements can improve efficiency and output. The empirical study showed that the turbine upgrade raised high pressure (HP) turbine efficiency by 5%, intermediate pressure (IP) turbine efficiency by 4%, and low pressure (LP) turbine efficiency by 2.5%. In addition, the unit's highest achievable gross generation increased from 360 MW to 371 MW. 3 figs.

Potter, K.; Olear, D.; [General Physics Corp. (United States)

2005-11-01T23:59:59.000Z

206

Syngas Upgrading to Hydrocarbon Fuels Technology Pathway  

Broader source: Energy.gov [DOE]

This technology pathway case investigates the upgrading of woody biomass derived synthesis gas (syngas) to hydrocarbon biofuels. While this specific discussion focuses on the conversion of syngas via a methanol intermediate to hydrocarbon blendstocks, there are a number of alternative conversion routes for production of hydrocarbons through a wide array of intermediates from syngas. Future work will also consider the variations to this pathway to determine the most economically viable and lowest risk conversion route. Technical barriers and key research needs have been identified that should be pursued for the syngas-to-hydrocarbon pathway to be competitive with petroleum-derived gasoline-, diesel- and jet-range hydrocarbon blendstocks.

207

ATLAS Tile Calorimeter Electronics and Future Upgrade  

E-Print Network [OSTI]

The Tile Calorimeter (TileCal) of the ATLAS experiment is the hadronic calorimeter designed for energy reconstruction of hadrons, jets, tau-particles and missing transverse energy. An overview of the on-detector and off-detector TileCal electronics used for ATLAS data taking is given. Upgrade plans for TileCal electronics for the High Luminosity LHC programme in 2024 are discussed, together with R&D activities at different laboratories that target different parts of the TileCal electronics. In particular, a demonstrator prototype for TileCal electronics to be installed during the long shutdown in 2014 is described.

Usai, G; The ATLAS collaboration

2014-01-01T23:59:59.000Z

208

MCNPX graphics and arithmetic tally upgrades  

SciTech Connect (OSTI)

The MCNPX MCPLOT package is the tool used to plot tallies and cross-sections. We report on an assortment of upgrades to MCPLOT that are intended to improve the appearance of two-dimensional tally and cross-section plots. We have also expanded the content and versatility of the MCPLOT 'help' command. Finally, we describe the initial phase of capability implementation to post-process tally data using arithmetic operations. These improvements will enable users to better display and manipulate simulation results.

Durkee, Joe W [Los Alamos National Laboratory; James, Michael R [Los Alamos National Laboratory; Waters, Laurie S [Los Alamos National Laboratory

2008-01-01T23:59:59.000Z

209

Extension - Upgrading Methane Using Ultra-Fast Thermal Swing Adsorption  

SciTech Connect (OSTI)

The need for cost effective technologies for upgrading coal mine methane to pipeline quality natural gas is becoming ever greater. The current work presents and investigates a new approach to reduce the impact of the most costly step in the conventional technology, nitrogen rejection. The proposed approach is based on the Velocys microchannel platform, which is being developed to commercialize compact and cost efficient chemical processing technology. For this separation, ultra fast thermal swing sorption is enabled by the very high rates of heat and mass transfer inherent in microchannel processing. In a first phase of the project solid adsorbents were explored. Feasibility of ultrafast thermal swing was demonstrated but the available adsorbents had insufficient differential methane capacity to achieve the required commercial economics. In a second phase, ionic liquids were adopted as absorbents of choice, and experimental work and economic analyses, performed to gauge their potential, showed promise for this novel alternative. Final conclusions suggest that a combination of a required cost target for ionic liquids or a methane capacity increase or a combination of both is required for commercialization.

Anna Lee Tonkovich

2008-08-11T23:59:59.000Z

210

EBR-II cover-gas cleanup system upgrade  

SciTech Connect (OSTI)

Technology advances in the past few years have prompted an effort at Argonne National Laboratory to replace existing equipment with high-performance digital computers and color-graphic displays. Improved operation of process systems can be achieved by utilizing state-of-the-art computer technology in the areas of process control and process monitoring. The cover-gas cleanup system (CGCS) at the Experimental Breeder Reactor II (EBR-II) is the first system to be upgraded with high-performance digital equipment. The upgrade consisted of a main control computer, a distributed control computer, a front-end input/output computer, a main graphics interface terminal, and a remote graphics interface terminal. This paper describes the main control computer and the operator interface control software. Argonne National Laboratory's EBR-II is a pool-type nuclear reactor demonstration facility that uses liquid sodium as the primary system and secondary system coolant. The primary system tank contains [approximately]330000 [ell] of liquid sodium blanketed with an argon cover gas. Despite this inert atmosphere, the primary system requires a cover-gas monitoring and cleanup system, the CGCS. The CGCS maintains low levels of impurities in the cover gas so that even small levels of impurities can be detected to flag a failed fuel element and to support mass spectrometer analysis to identify a failed fuel element. Impurities can be introduced to the argon cover gas by the failure of fuel element cladding and the subsequent release of gaseous fission products or xenon [open quotes]tag gas[close quotes] placed in the fuel elements for the purpose of signaling a fuel element breach. The CGCS consists of a main cleanup loop and a gas analysis system.

Staffon, J.D.; Carlson, R.B. (Argonne National Lab., Idaho Falls (United States))

1993-01-01T23:59:59.000Z

211

PINCETTE Validating Changes and Upgrades in Networked Software Hana Chockler  

E-Print Network [OSTI]

analysis; run-time monitoring; model checking; incremental software development I. INTRODUCTION, expensive, and unreliable. Yet in safety-critical applications such as aerospace, nuclear reactors in improve- ments in software reliability and reduction in maintenance costs. The demand of such a solution

Milano-Bicocca, Università

212

Nanoparticle technology for heavy oil in-situ upgrading and recovery enhancement: Opportunities and challenges  

Science Journals Connector (OSTI)

Abstract With more than 170 billion barrels of estimated oil sands reserves in Canada, Canada has the third largest oil reserves in the world. However, more than 80% of oil sand’s reserves are located deep underground and could not be accessed by surface mining. Nonetheless, a number of in-situ recovery methods have been developed to extract heavy oil and bitumen from deep reservoirs. Once produced, bitumen is transferred to upgraders converting low quality oil to synthetic crude oil. However, in the present context, heavy oil and bitumen exploitation process is not just high-energy and water intensive, but also it has significant environmental footprints as it produces significant amount of gaseous emissions and wastewater. In addition, the level of contaminants in bitumen requires special equipment, and has also environmental repercussions. Recently, nanotechnology has emerged as an alternative technology for in-situ heavy oil upgrading and recovery enhancement. Nanoparticle catalysts (nanocatalysts) are one of the important examples on nanotechnology applications. Nanocatalysts portray unique catalytic and sorption properties due to their exceptionally high surface area-to-volume ratio and active surface sites. In-situ catalytic conversion or upgrading of heavy oil with the aid of multi-metallic nanocatalysts is a promising cost effective and environmentally friendly technology for production of high quality oils that meet pipeline and refinery specifications. Further, nanoparticles could be employed as inhibitors for preventing or delaying asphaltene precipitation and subsequently enhance oil recovery. Nevertheless, as with any new technologies, there are a number of challenges facing the employment of nanoparticles for in-situ catalytic upgrading and recovery enhancement. The main goal of this article is to provide an overview of nanoparticle technology usage for enhancing the in-situ catalytic upgrading and recovery processes of crude oil. Furthermore, the article sheds lights on the advantages of employment of nanoparticles in heavy oil industry and addresses some of the limitations and challenges facing this new technology.

Rohallah Hashemi; Nashaat N. Nassar; Pedro Pereira Almao

2014-01-01T23:59:59.000Z

213

The enhanced ASDEX Upgrade pellet centrifuge launcher  

SciTech Connect (OSTI)

Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.

Plöckl, B.; Lang, P. T. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)] [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

2013-10-15T23:59:59.000Z

214

ATLAS Upgrade Instrumentation in the US  

E-Print Network [OSTI]

Planned upgrades of the LHC over the next decade should allow the machine to operate at a center of mass energy of 14 TeV with instantaneous luminosities in the range 5--7e34 cm^-2 s^-1. With these parameters, ATLAS could collect 3,000 fb^-1 of data in approximately 10 years. However, the conditions under which this data would be acquired are much harsher than those currently encountered at the LHC. For example, the number of proton-proton interactions per bunch crossing will rise from the level of 20--30 per 50 ns crossing observed in 2012 to 140--200 every 25 ns. In order to deepen our understanding of the newly discovered Higgs boson and to extend our searches for physics beyond that new particle, the ATLAS detector, trigger, and readout will have to undergo significant upgrades. In this whitepaper we describe R&D necessary for ATLAS to continue to run effectively at the highest luminosities foreseen from the LHC. Emphasis is placed on those R&D efforts in which US institutions are playing a leading role.

Gustaaf Brooijmans; Hal Evans; Abe Seiden

2013-07-22T23:59:59.000Z

215

ATLAS Upgrade Instrumentation in the US  

E-Print Network [OSTI]

Planned upgrades of the LHC over the next decade should allow the machine to operate at a center of mass energy of 14 TeV with instantaneous luminosities in the range 5--7e34 cm^-2 s^-1. With these parameters, ATLAS could collect 3,000 fb^-1 of data in approximately 10 years. However, the conditions under which this data would be acquired are much harsher than those currently encountered at the LHC. For example, the number of proton-proton interactions per bunch crossing will rise from the level of 20--30 per 50 ns crossing observed in 2012 to 140--200 every 25 ns. In order to deepen our understanding of the newly discovered Higgs boson and to extend our searches for physics beyond that new particle, the ATLAS detector, trigger, and readout will have to undergo significant upgrades. In this whitepaper we describe R&D necessary for ATLAS to continue to run effectively at the highest luminosities foreseen from the LHC. Emphasis is placed on those R&D efforts in which US institutions are playing a leadin...

Brooijmans, Gustaaf; Seiden, Abe

2013-01-01T23:59:59.000Z

216

CEBAF Upgrade: Cryomodule Performance And Lessons Learned  

SciTech Connect (OSTI)

The Thomas Jefferson National Accelerator Facility is currently engaged in the 12 GeV Upgrade Project. The goal of the 12 GeV Upgrade is a doubling of the available beam energy of the Continuous Electron Beam Accelerator Facility (CEBAF) from 6 GeV to 12 GeV. This increase in beam energy will be due in large part to the addition of ten C100 cryomodules plus associated new RF in the CEBAF linacs. The C100 cryomodules are designed to deliver 100 MeV per installed cryomodule. Each C100 cryomodule is built around a string of eight seven-cell, electro-polished, superconducting RF cavities. While an average performance of 100MV per cryomodule is needed to achieve the overall 12 GeV beam energy goal, the actual performance goal for the cryomodules is an average energy gain of 108 MV to provide operational headroom. Cryomodule production started in December 2010. All ten of the C100 cryomodules are installed in the linac tunnels and are on schedule to complete commissioning by September 2013. Performance during Commissioning has ranged from 104 MV to 118 MV. In May, 2012 a test of an early C100 achieved 108 MV with full beam loading. This paper will discuss the performance of the C100 cryomodules along with operational challenges and lessons learned for future designs.

Drury, Michael A.; Davis, G. Kirk; Hogan, John P.; Hovater, J. Curt; King, Lawrence; Marhauser, Frank; Park, HyeKyoung; Preble, Joe; Reece, Charles E.; Rimmer, Robert A.; Wang, Haipeng; Wiseman, Mark A.

2014-02-01T23:59:59.000Z

217

Algal Lipid Extraction and Upgrading to Hydrocarbons Technology Pathway  

Broader source: Energy.gov [DOE]

This technology pathway case investigates the cultivation of algal biomass followed by further lipid extraction and upgrading to hydrocarbon biofuels. Technical barriers and key research needs have been assessed in order for the algal lipid extraction and upgrading pathway to be competitive with petroleum-derived gasoline-, diesel-, and jet-range hydrocarbon blendstocks.

218

Recent ASDEX Upgrade Research in Support of ITER and DEMO  

E-Print Network [OSTI]

Energy Conference, OV2/2, St. Petersburg, Russia, 13.10.2014 · ASDEX Upgrade: machine and programme allowed (?) Virtually no disruptions #12;ASDEX Upgrade has a powerful H&CD system Neutral Beam Injection;Stagnation of core density build-up due to fuelling limit (source shifts to SOL) High SOL density leads

219

Health and Safety Plan for NSTX Upgrade Project Tasks  

E-Print Network [OSTI]

Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell PRINCETON PLASMA....~_____...L....,L....q..l:::::.......:.J Larry Dudek, NSTX Center Stack Manager Reviewed by: I( Jer evine, Environment, Safety, Health and S This document describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade

Princeton Plasma Physics Laboratory

220

Health and Safety Plan for NSTX Upgrade Project Tasks  

E-Print Network [OSTI]

Draft 0 6/17/11 1 Health and Safety Plan for NSTX Upgrade Project Tasks in the NSTX Test Cell: _____________________________________________________________ Jerry Levine, Environment, Safety, Health and Security Head Reviewed by describes the structure and implementation of the Health and Safety Plan for the NSTX Upgrade Project work

Princeton Plasma Physics Laboratory

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Properties of Upgraded Shengli Lignite and Its Behavior for Gasification  

Science Journals Connector (OSTI)

Low-rank coals (LRCs, i.e., brown coal and lignite) have an estimated proportion of 45% of the world’s coal reserves and constitute a significant resource for both energy and chemical feedstocks. ... (10)Figure 15 shows the calculating results of reactivity parameters (Rmax, Rave, and R) for SL lignite and different upgraded lignites obtained by isothermal upgrading. ...

Xianjun Yang; Cheng Zhang; Peng Tan; Tao Yang; Qingyan Fang; Gang Chen

2013-10-29T23:59:59.000Z

222

LHC accelerator R&D and upgrade scenarios  

Science Journals Connector (OSTI)

I report the results of a CERN task force set up to investigate a possible staged upgrade of the LHC and of its injectors, with a view...34 cm–2 s–1 to 1035 cm–2 s–1. Scenarios for an LHC energy upgrade by nearly...

F. Ruggiero

2004-07-01T23:59:59.000Z

223

RF System Modeling for the CEBAF Energy Upgrade  

SciTech Connect (OSTI)

An RF system model, based on MATLAB/SIMULINK, has been developed for analyzing the basic characteristics of the low level RF (LLRF) control system being designed for the CEBAF 12 GeV Energy Upgrade. In our model, a typical passband cavity representation is simplified to in-phase and quadrature (I&Q) components. Lorentz Force and microphonic detuning are incorporated as a new quadrature carrier frequency (frequency modulation). Beam is also represented as in-phase and quadrature components and superpositioned with the cavity field vector. Signals pass through two low pass filters, where the cutoff frequency is equal to half of the cavity bandwidth, then they are demodulated using the same detuning frequency. Because only baseband I&Q signals are calculated, the simulation process is very fast when compared to other controller-cavity models. During the design process we successfully analyzed gain requirements vs. field stability for different superconducting cavity microphonic backgrounds and Lorentz Force coefficients. Moreover, we were able to evaluate different types of a LLRF system’s control algorithm: GDR (Generator Driven Resonator) and SEL (Self Excited Loop) [1] as well as klystron power requirements for different cavities and beam loads.

Tomasz Plawski, J. Hovater

2009-05-01T23:59:59.000Z

224

Micromegas chambers for the ATLAS Muon Spectrometer Upgrade  

E-Print Network [OSTI]

Micromegas (Micro MEsh Gaseous Structure) chambers have been proven along the years to be reliable fast detectors with an excellent spatial resolution. The ATLAS collaboration at LHC has chosen the micromegas technology along with the small-strip Thin Gap Chambers (sTGC) for the high luminosity upgrade of the inner muon station in the high-rapidity region, the so called New Small Wheel (NSW). It employs eight layers of micromegas detectors and eight layers of sTGC. The NSW project requires fully efficient micromegas chambers with spatial resolution down to $100\\mu m$ over a total active area of $1200 m^2$ with a rate capability up to $10 kHz/cm^2$ and operation in a moderate magnetic field up to B=0.3 T. The required tracking capability is provided by the intrinsic space resolution combined with a mechanical precision at the level of $30 \\mu m$ along the precision coordinate. Moreover together with the precise tracking capability the micromegas chambers should provide a trigger signal. An extensive R&D pr...

Ntekas, Konstantinos; The ATLAS collaboration

2014-01-01T23:59:59.000Z

225

Unique Solar Thermal Laboratory Gets an Upgrade | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade Unique Solar Thermal Laboratory Gets an Upgrade September 10, 2010 - 2:54pm Addthis This “power tower” is part of the National Solar Thermal Test Facility in Albuquerque, which is getting upgrades through Recovery Act funding. | Photo Courtesy of Sandia National Laboratories This "power tower" is part of the National Solar Thermal Test Facility in Albuquerque, which is getting upgrades through Recovery Act funding. | Photo Courtesy of Sandia National Laboratories Lorelei Laird Writer, Energy Empowers The National Solar Thermal Test Facility at Sandia National Laboratories is unique - and in demand. The Facility has been instrumental in NASA tests, national defense programs and concentrated solar technology development.

226

EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade  

Broader source: Energy.gov (indexed) [DOE]

7: Idaho National Engineering Laboratory Sewer System Upgrade 7: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho EA-0907: Idaho National Engineering Laboratory Sewer System Upgrade Project, Idaho Falls, Idaho SUMMARY This EA evaluates the environmental impacts of a proposal to upgrade the Sewer System at the U.S. Department of Energy's Idaho National Engineering Laboratory (INEL) near Idaho Falls, Idaho. The proposed action would include activities conducted at the Central Facilities Area, Test Reactor Area, and the Containment Test Facility at the Test Area North at INEL. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD April 1, 1994 EA-0907: Finding of No Significant Impact Idaho National Engineering Laboratory Sewer System Upgrade Project

227

Energy Efficiency Upgrades Help Retired Military Officers Save Money |  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Upgrades Help Retired Military Officers Save Energy Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs What are the key facts? A retirement community in San Antonio worked with a local Better

228

Energy Efficiency Upgrades Help Retired Military Officers Save Money |  

Broader source: Energy.gov (indexed) [DOE]

Efficiency Upgrades Help Retired Military Officers Save Efficiency Upgrades Help Retired Military Officers Save Money Energy Efficiency Upgrades Help Retired Military Officers Save Money May 7, 2013 - 12:50pm Addthis A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. A retirement community in San Antonio worked with a local Better Buildings Neighborhood Program partner, CPS Energy Saver, to make energy efficiency upgrades to 189 single-family cottages. | Photo courtesy of CPS Energy. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs What are the key facts? A retirement community in San Antonio worked with a local Better

229

Energy Efficiency Upgrades Help Build Better Neighborhoods | Department of  

Broader source: Energy.gov (indexed) [DOE]

Efficiency Upgrades Help Build Better Neighborhoods Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs

230

Energy Efficiency Upgrades Help Build Better Neighborhoods | Department of  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods Energy Efficiency Upgrades Help Build Better Neighborhoods May 6, 2013 - 4:55pm Addthis In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. | Photo by Ed Hancock, NREL. Rebecca Matulka Rebecca Matulka Digital Communications Specialist, Office of Public Affairs

231

EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmissio...  

Broader source: Energy.gov (indexed) [DOE]

1: Midway-Moxee Rebuild and Midway-Grandview Upgrade Transmission Line, Benton and Yakima Counties, Washington EA-1951: Midway-Moxee Rebuild and Midway-Grandview Upgrade...

232

Standard Work Specifications for Single-Family Home Energy Upgrades Summary (Fact Sheet), Guidelines For Home Energy Professionals, Energy Efficiency & Renewable Energy (EERE)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Work Specifications Work Specifications for Single-Family Home Energy Upgrades Summary The U.S. Department of Energy (DOE), the National Renewable Energy Laboratory (NREL) and numer- ous industry stakeholders developed the Standard Work Specifications for Single-Family Home Energy Upgrades to define the minimum requirements for high- quality residential energy upgrades. The Standard Work Specifications for Single-Family Home Energy Upgrades is the first of three documents that will be published in 2012 and 2013 as part of the Guidelines for Home Energy Professionals project. Specifications for manufactured housing and multifamily homes will also be available. DOE, NREL, and industry developed the Standard Work Specifications under the Weatherization Assistance Program, building on more than 30 years of experience

233

Upgrading the TFTR Transrex Power Supplies  

SciTech Connect (OSTI)

In order to provide improved and expanded experimental capabilities, the existing Transrex power supplies at PPPL are to be upgraded and modernized. Each of the 39 power supplies consists of two six pulse silicon controlled rectifier sections forming a twelve pulse power supply. The first modification is to split each supply into two independent six pulse supplies by replacing the existing obsolete twelve pulse firing generator with two commercially available six pulse firing generators. The second change replaces the existing control link with a faster system, with greater capacity, which will allow for independent control of all 78 power supply sections. The third change replaces the existing Computer Automated Measurement and Control (CAMAC) based fault detector with an Experimental Physics and Industrial Control System (EPICS) compatible unit, eliminating the obsolete CAMAC modules. Finally the remaining relay logic and interfaces to the "Hardwired Control System" will be replaces with a Programmable Logic Controller (PLC).

J. E. Lawson, R. Marsala, S. Ramakrishnan, X. Zhao, P. Sichta

2009-05-29T23:59:59.000Z

234

Steam turbine upgrading: low-hanging fruit  

SciTech Connect (OSTI)

The thermodynamic performance of the steam turbine, more than any other plant component, determines overall plant efficiency. Upgrading steam path components and using computerized design tools and manufacturing techniques to minimise internal leaks are two ways to give tired steam turbines a new lease on life. The article presents three case studies that illustrate how to do that. These are at Unit 1 of Dairyland's J.P. Madgett Station in Alma, WI, a coal-fired subcritical steam plant; the four units at AmerenUE's 600 MW coal-fired Labadie plant west of St. Louis; and Unit 3 of KeyPlan Corp's Northport Power Station on Long Island. 8 figs.

Peltier, R.

2006-04-15T23:59:59.000Z

235

Building Adaptable Sensor Networks with Sensor Cubes  

E-Print Network [OSTI]

of layers allows easy experiments, upgrades and extensions Small-scale sensor network Example sensor module- world network algorithm and power management behavior · Results from small scale tests can be compared (short packets and high bit rate reduce collision probability); Transmitter's MAC table logic: Small

Roussos, George

236

Superconducting RF Lab Facility Upgrades at Los Alamos  

SciTech Connect (OSTI)

Research and testing of multi-cell superconducting cavities demands extensive contamination control resources to achieve high-cavity fields. Facility upgrades at Los Alamos National Laboratory (LANL) included the modernization of test equipment, expanding and modernizing cleanroom facilities, improving safety, and expanding the high-pressure rinse cleaning process equipment. Each upgrade was integrated into the facility to enable users to assemble prototype cryomodules. The scope of the upgrades, the new installed capability, and budget and schedule for certain aspects of the project are discussed in this paper.

Katonak, D.J.; Rusnak, B.

1999-03-01T23:59:59.000Z

237

Upgrading of petroleum oil feedstocks using alkali metals and hydrocarbons  

DOE Patents [OSTI]

A method of upgrading an oil feedstock by removing heteroatoms and/or one or more heavy metals from the oil feedstock composition. This method reacts the oil feedstock with an alkali metal and an upgradant hydrocarbon. The alkali metal reacts with a portion of the heteroatoms and/or one or more heavy metals to form an inorganic phase separable from the organic oil feedstock material. The upgradant hydrocarbon bonds to the oil feedstock material and increases the number of carbon atoms in the product. This increase in the number of carbon atoms of the product increases the energy value of the resulting oil feedstock.

Gordon, John Howard

2014-09-09T23:59:59.000Z

238

Screening of processing and upgrading schemes. Task 3  

SciTech Connect (OSTI)

The RFP was predicated on DOE`s desire to enhance the development of advanced transportation fuels made from coal via a program to process mild coal gasification (MCG) liquids into high volumetric energy density (HEDF) test fuels. The desired product fuels were to be cost effectively manufactured, have high volumetric energy density, and be hydrocarbon-based for existing and prototype turbine and diesel engines. The sources for these special fuels consist of the abundant and secure indigenous energy resources of coal. Comparison studies were also to be made using other non-petroleum fossil fuels such as shale oil and tar sands bitumen. METC has concluded that MCG technology has the potential to simultaneously satisfy the transportation and power generation fuel needs in the most cost-effective manner. MCG is based on low temperature pyrolysis, a technique known to the coal community for over a century. Most past pyrolysis developments were aimed at maximizing the liquids yield which results in a low quality tarry product requiring significant and capital intensive upgrading. By properly tailoring the pyrolysis severity to control the liquid yield-liquid quality relationship, it has been found that a higher quality distillate-boiling liquid can be readily ``skimmed`` from the coal. The resultant liquids have a much higher H/C ratio than conventional pyrolytic tars and therefore can be hydroprocessed at lower cost. These liquids are also extremely enriched in 1-, 2-, and 3-ring aromatics.

Not Available

1991-10-01T23:59:59.000Z

239

Booster Synchrotron RF System Upgrade for SPEAR3  

SciTech Connect (OSTI)

Recent progress at the SPEAR3 includes the increase in stored current from 100 mA to 200 mA and top-off injection to allow beamlines to stay open during injection. Presently the booster injects 3.0 GeV beam to SPEAR3 three times a day. The stored beam decays to about 150 mA between the injections. The growing user demands are to increase the stored current to the design value of 500 mA, and to maintain it at a constant value within a percent or so. To achieve this goal the booster must inject once every few minutes. For improved injection efficiency, all RF systems at the linac, booster and SPEAR3 need to be phase-locked. The present booster RF system is basically a copy of the SPEAR2 RF system with 358.5 MHz and 40 kW peak RF power driving a 5-cell RF cavity for 1.0 MV gap voltage. These requirements entail a booster RF system upgrade to a scaled down version of the SPEAR3 RF system of 476.3 MHz with 1.2 MW cw klystron output power capabilities. We will analyze each subsystem option for their merits within budgetary and geometric space constraints. A substantial portion of the system will come from the decommissioned PEP-II RF stations.

Park, Sanghyun; /SLAC; Corbett, Jeff; /SLAC

2012-07-06T23:59:59.000Z

240

Linac cryogenic distribution system maintenance and upgrades at JLab  

SciTech Connect (OSTI)

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

Dixon, K.; Wright, M.; Ganni, V. [Thomas Jefferson National Accelerator Facility (JLab), Newport News, VA 23606 (United States)

2014-01-29T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Linac cryogenic distribution system maintenance and upgrades at Jlab  

SciTech Connect (OSTI)

The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm{sup 3} of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

Dixon, Kelly D. [JLAB; Wright, Mathew C. [JLAB; Ganni, Venkatarao [JLAB

2014-01-01T23:59:59.000Z

242

Environmental assessment for the domestic water supply upgrades and consolidation on the Savannah River Site  

SciTech Connect (OSTI)

The domestic water systems on the Savannah River Site (SRS) are currently in need of upgrading to ensure compliance with the Safe Drinking Water Act and South Carolina Department of Health and Environmental Control (SCDHEC) Drinking Water Regulations. The SRS has 28 separate goundwater-based drinking water systems in use across the site. These aging systems were designed and constructed in the 1950s and are now facing increasing difficulties in meeting cur-rent regulations. Audits of the systems conducted by SCDHEC in 1986, 1988, 1991, and 1993 identified shortfalls in meeting the requirements for secondary maximum containment levels (MCLS) and SCDHEC design standards. Secondary MCLs are those items, such as odor or appearance, that do not pose a direct health impact. SRS has committed to SCDHEC to correct the drinking water discrepancies and construct two new consolidated inter-area drinking water systems. Upgrading the SRS drinking water systems would be necessary to support site activities regardless of the makeup or the mission at SRS. As such, the proposed upgrade and consolidation of SRS domestic water systems is treated as part of the ``No Action`` alternative for the Programmatic Environmental Impact Statement for Reconfiguration of the Nuclear Weapons Complex .

Not Available

1994-06-01T23:59:59.000Z

243

Upgrade fo the CMS Hadron Outer Calorimeter with SIPMs  

SciTech Connect (OSTI)

The CMS Hadron Outer Calorimeter (HO) is undergoing an upgrade to replace the existing photodetectors (HPDs) with SIPMs. The chosen device is the Hamamatsu 3 x 3mm 50 {mu}m pitch MPPC. The system has been developed to be a 'drop-in' replacement of the HPDs. A complete control system of bias voltage generation, leakage current monitoring, temperature monitoring, and temperature control using solid state Peltier coolers has been developed and tested. 108 channels of the system have been installed into CMS and operated for more than 2 years. The complete system of about 2200 channels is in production and will be installed in the next LHC long shutdown scheduled for 2013. The CMS central calorimeter consists of a detector inside the solenoidal magnet, HB, and a component outside the magnet, the Outer Hadron Calorimeter, HO [1]. The HO is installed inside the magnet flux return yoke and provides for typically 3{lambda} of additional absorber to the calorimetric measurement. The outer calorimeter is composed of one or more layers of scintillator with wavelength shifting fiber readout into photodetectors. Figure 1 (a) shows the schematic layout of the calorimeters in CMS and shows the location of the HO scintillator layers. The front end electronics are placed inside the CMS detector, close to the scintillators. Figure 1(b) shows a photograph of the scintillators. Note the four wavelength shifting fibers per tile. The tile size creates a projective tower with the HB. Currently the photodetector used is the HPD but for performance and operational reasons it is desired to upgrade these with SIPMs. The CMS HCAL group has developed a drop-in replacement for the HPD using SIPMs. SIPMs are very suitable for this application because of several factors: The radiation levels are modest with a lifetime expected fluence of less than 5*10{sup 11} neutrons (E > 100 KeV) per cm{sup 2}. The energy flux into HO is small, the rate of larger energy depositions is low, and the required dynamic range is modest. The HO is in the return magnetic field of up to 2KG and the photodetector needs to operate in that environment. Finally, the available physical volume for the photodetectors is small.

Anderson, Jacob; Freeman, James; Los, Sergey; Whitmore, Juliana; /Fermilab

2011-09-14T23:59:59.000Z

244

Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades  

Broader source: Energy.gov [DOE]

Hydropower Advancement Project (HAP): Audits and Feasibility Studies for Capacity and Efficiency Upgrades

245

Better Buildings: Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy Upgrade Conversions  

Broader source: Energy.gov [DOE]

Better Buildings: Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy Upgrade Conversions

246

Find Financing for Energy Efficiency Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Find Financing for Energy Efficiency Upgrades Find Financing for Energy Efficiency Upgrades Find Financing for Energy Efficiency Upgrades Photo of a block in lower downtown Denver that is part of Living City Block, a DOE Commercial Building Partnerships participant. Financing need not be a barrier to improving energy efficiency in your commercial building. There are federal, state, and local and tax incentives for energy efficiency upgrades, and other financial opportunities to help you meet your energy goals. The U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy, for example, offers financial assistance opportunities to business, industry, universities, and others for the development and demonstration of energy efficiency strategies and technologies. Other methods of financing energy efficiency improvements

247

SRS upgrades helium recovery system | National Nuclear Security  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

upgrades helium recovery system | National Nuclear Security upgrades helium recovery system | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > NNSA Blog > SRS upgrades helium recovery system SRS upgrades helium recovery system Posted By Office of Public Affairs Savannah River Site (SRS) Tritium Programs recently completed a project to design, build and relocate a new system for separating and capturing

248

Federal Finance Facilities Available for Energy Efficiency Upgrades and  

Broader source: Energy.gov (indexed) [DOE]

Federal Finance Facilities Available for Energy Efficiency Upgrades Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment "Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment" is a resource guide that lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local and tribal leaders, along with their partners in the private sector, to find capital for energy efficiency and clean energy projects. This first-edition guide is a product of a cooperative effort among seven federal agencies, including the U.S. Departments of Agriculture, Energy, Housing and Urban Development, Transportation and Treasury, along with the

249

Federal Finance Facilities Available for Energy Efficiency Upgrades and  

Broader source: Energy.gov (indexed) [DOE]

Federal Finance Facilities Available for Energy Efficiency Upgrades Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment "Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment" is a resource guide that lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local and tribal leaders, along with their partners in the private sector, to find capital for energy efficiency and clean energy projects. This first-edition guide is a product of a cooperative effort among seven federal agencies, including the U.S. Departments of Agriculture, Energy, Housing and Urban Development, Transportation and Treasury, along with the

250

Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure |  

Broader source: Energy.gov (indexed) [DOE]

Case Study - Energy Efficiency Upgrades for Fermilab Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure Case Study - Energy Efficiency Upgrades for Fermilab Infrastructure October 7, 2013 - 3:29pm Addthis Utility energy service contracting provides needed plant improvements. Photo of Project Coordinator Steve Krstulovich with Fermilab's new 1400-ton, high-efficiency chiller. Project Coordinator Steve Krstulovich with Fermilab's new 1400-ton, high-efficiency chiller. Overview The U.S. Department of Energy's (DOE's) Fermi National Accelerator Laboratory (Fermilab) has replaced old equipment and reduced energy consumption through a partnership with its electric utility, Commonwealth Edison. Fermilab upgraded the centralized cooling system and separated the system into two segments - a "comfort system" to cool the employee office

251

Energy Efficiency Upgrades Part of Winning Formula for Oregon School  

Broader source: Energy.gov (indexed) [DOE]

Upgrades Part of Winning Formula for Oregon Upgrades Part of Winning Formula for Oregon School District Energy Efficiency Upgrades Part of Winning Formula for Oregon School District August 27, 2012 - 9:45am Addthis The community of Vernonia, OR, celebrates the opening of a new energy efficient school. | Photo courtesy of April Baer, OPB. The community of Vernonia, OR, celebrates the opening of a new energy efficient school. | Photo courtesy of April Baer, OPB. Todd G. Allen Project Officer, Golden Field Office What are the key facts? Energy efficiency upgrades will reduce the Vernonia school district's energy usage by 43 percent and save taxpayers more than $62,000 a year. The school will also serve as a laboratory for forest technologies

252

EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook,  

Broader source: Energy.gov (indexed) [DOE]

37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, 37: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR EA-1937: Pacific Direct Intertie Upgrade Project, Lake, Jefferson, Crook, Deschutes, and Wasco Co, OR SUMMARY This project would replace aging equipment at BPA's Celilo converter station and to upgrade equipment on the Celilo-Sylmar 500-kilovolt (kV) transmission line from the Celilo converter station in The Dalles, Oregon to the Nevada-Oregon border. As part of the project, BPA would remove and salvage the converter terminals 1 and 2 at its Celilo converter station and install a new two-converter terminal. A 20-acre expansion of the existing substation would accommodate the new terminal equipment. About 265 miles of transmission towers on the Celilo-Sylmar 500-kV transmission line would be

253

NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

NERSC's Franklin NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability NERSC's Franklin Supercomputer Upgraded to Double Its Scientific Capability July 20, 2009 OCEAN EDDIES: This image comes from a computer simulation modeling eddies in the ocean. An interesting feature is the abundance of eddies away from the equator, which is shown in the center of the image at y=0. This research collaboration led by Paola Cessi of the Scripps Institute of Oceanography performed over 15,000 years worth of deep ocean circulation simulations with 1.6 million processor core hours on the upgraded Franklin system. The Department of Energy's (DOE) National Energy Research Scientific Computing (NERSC) Center has officially accepted a series of upgrades to its Cray XT4 supercomputer, providing the facility's 3,000 users with twice

254

Lowell, Massachusetts, Preserves Historic Home Through Energy Upgrades  

Broader source: Energy.gov [DOE]

Artist James MacNeil Whistler's birthplace home in Lowell, Massachusetts, was built in 1823 and now houses the Lowell Art Association. The house was in need of a series of upgrades that improved energy efficiency while catering to the specific needs of a historic home and museum. Through the BetterBuildings Lowell Energy Upgrade program, the historic house will receive upgrades that include a high-velocity, small-duct HVAC system, updated storm windows, and attic insulation. These upgrades will reduce humidity in order to preserve the artwork displayed, and catch up to modern electrical demand without sacrificing the home's historic characteristics—all while providing energy savings of more than 30%. To learn more about how the project was financed and further details on the innovative HVAC equipment, read the original post from Lowell's Office of the Mayor's blog.

255

Bioenergy Technologies Office R&D Pathways: Algal Lipid Upgrading  

Broader source: Energy.gov [DOE]

Algal lipid upgrading is one of eight priority pathways chosen to convert biomass into hydrocarbon fuels by the Bioenergy Technologies Office. These pathways were down-selected from an initial list of 18.

256

Financing Energy Upgrades for K-12 School Districts  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) presentation at a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

257

CHICAGO HOUSE PARTIES SHOW WAYS TO UPGRADE | Department of Energy  

Energy Savers [EERE]

created Energy Impact Illinois (EI2) to promote home energy upgrades in single-family homes, multifamily housing units, and commercial buildings to help the region meet its 2008...

258

EECBG Success Story: Michigan County's Energy Upgrades Back on...  

Broader source: Energy.gov (indexed) [DOE]

the 'middle of the mitten,' is using over 300,000 in Recovery Act funds to perform ene Michigan County's Energy Upgrades Back on Track EECBG Success Story: The Jury's In:...

259

Office of Science Approves Critical Decision 1 for APS Upgrade...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2008 | 2007 | 2006 | 2005 2004 | 2003 | 2002 | 2001 2000 Subscribe to APS News rss feed Office of Science Approves Critical Decision 1 for APS Upgrade Project SEPTEMBER 15, 2011...

260

Financing; A Cost Effective Alternative When Upgrading Energy Efficient Systems  

E-Print Network [OSTI]

in order to effectively compete in the marketplace. One obvious method of reducing costs and improving productivity is to upgrade old, antiquated equipment such as lighting to more modern energy efficient systems. Most projects provide a return...

Ertle, J. M.

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Energy Upgrade California Drives Demand From Behind the Wheel  

Broader source: Energy.gov [DOE]

With a goal of "energy efficiency or bust," the California Center for Sustainable Energy (CCSE) recently completed a statewide tour of its ongoing Energy Upgrade California Roadshow. The mobile...

262

Capturing Energy Efficiency Upgrades in the Real Estate Transaction  

Broader source: Energy.gov [DOE]

"Capturing Energy Efficiency Upgrades in the Real Estate Transaction," by Residential Energy Efficiency Solutions, July 10, 2012. Describes the concept of a residential MPG number as a simple way of describing a home’s energy consumption.

263

Idaho: Nez Perce Tribe Energy-Efficient Facilities Upgrade |...  

Office of Environmental Management (EM)

adding insulation and motion sensors. As a result of the upgrades, the Tribe's electrical energy consumption is estimated to be reduced by 30%, thereby reducing the cost to operate...

264

BEST OFFER EVER ACCELERATED TEXAS UPGRADES | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

of Reported Data Data Dashboard Stories & Case Studies "Homeowners Go Deeper in the Heart of Texas and Save With Austin Energy" Best Offer Ever Produces Upgrades in Record Time...

265

Kitchen Appliance Upgrades Improve Water Efficiency at DOD Exchange Facilities  

Broader source: Energy.gov [DOE]

Case study details the Exchange (formerly the Army and Air Force Exchange Service), which took a leadership role in kitchen appliance upgrades to improve water efficiency by integrating water efficiency concepts into the organization's overall sustainability plan and objectives.

266

J.R. Simplot: Burner Upgrade Project Improves Performance and...  

Broader source: Energy.gov (indexed) [DOE]

Company saved energy and money by increasing the efficiency of the steam system in its potato processing plant in Caldwell, Idaho. J.R. Simplot: Burner Upgrade Project Improves...

267

EECBG Success Story: Energy Upgrades to Save Small Arizona Town...  

Broader source: Energy.gov (indexed) [DOE]

Related Articles An aerial shot of Oro Valley, Ariz.'s town hall campus shows proposed solar locations. | Photo courtesy of Oro Valley Energy Upgrades to Save Small Arizona Town...

268

Optical Link ASICs for the LHC Upgrade  

E-Print Network [OSTI]

We have designed three ASICs for possible applications in the optical links of a new layer of pixel detector in the ATLAS experiment for the first phase of the LHC luminosity upgrade. The ASICs include a high-speed driver for the VCSEL, a receiver/decoder to decode the signal received at the PIN diode to extract the data and clock, and a clock multiplier to produce a higher frequency clock to serialize the data for transmission. These ASICs were designed using a 130 nm CMOS process to enhance the radiation-hardness. We have characterized the fabricated ASICs and the submission has been mostly successful. We irradiated the ASICs with 24 GeV/c protons at CERN to a dosage of 70 Mrad. We observed no significant degradation except the driver circuit in the VCSEL driver fabricated using the thick oxide process in order to provide sufficient voltage to drive a VCSEL. The degradation is due to a large threshold shifts in the PMOS transistors used.

K. K. Gan; H. P. Kagan; R. D. Kass; J. R. Moore; D. S. Smith

2009-11-23T23:59:59.000Z

269

Recent BES results and the BESIII upgrade  

E-Print Network [OSTI]

Using 58 million $J/\\psi$ and 14 million $\\psi(2S)$ events collected by the BESII detector at the BEPC, branching fractions or upper limits for the decays $J/\\psi$ and $\\psi(2S) \\to \\Lambda \\bar{\\Lambda} \\pi^0$ and $\\Lambda \\bar{\\Lambda} \\eta$ are measured, and the decays of $J/\\psi$ and $\\psi(2S)$ to $n K^0_S \\bar{\\Lambda}+c.c.$ are observed and measured for the first time. Finally, $R$ measurement data taken with the BESII detector at center-of-mass energies between 3.7 and 5.0 GeV are fitted to determine resonance parameters of the high mass charmonium states, $\\psi(3770)$, $\\psi(4040)$, $\\psi(4160)$, and $\\psi(4415)$. The Beijing Electron Collider is being upgraded to a two-ring collider (BEPCII) with a design luminosity of $1 \\times 10^{33}$cm$^{-2}$ s$^{-1}$ at 3.89 GeV and will operate between 2 and 4.2 GeV in the center of mass. With this luminosity, the new BESIII detector will beable to collect, for example, 10 billion $J/\\psi$ events in one year of running. BEPCII and BESIII are currently nearing completion, and commissioning of both is expected to begin in mid-2008.

Frederick A. Harris

2007-12-17T23:59:59.000Z

270

D0 Silicon Upgrade: Pipe Sizing for Solenoid / VLPC Cryogenic Systems  

SciTech Connect (OSTI)

The addition of a solenoid magnet and VLPC detectors are two of a number of upgrades which will occur at the D-Zero detector in the near future. Both of these upgrades will require cryogenic services for their operation. The purpose of this engineering note is to document the pipe/tube size choices made for these cryogenic services. This was done by calculating the required flow rates to cool down the magnet and VLPC's over a reasonable length of time and to determine the required piping sizes for a given allowable pressure drop. The pressure drops for steady state conditions also are addressed. The cool down requirements drove the pipe size decision. The raw engineering calculations that were done for this project are included as an appendix to this note. The body of this document discusses the methods and results of the calculations. As a quick summary, Figures 1 and 2 show the size selections. Tables 1 and 2 give a more detailed size and description of each section of Solenoid and VLPC transfer line.

Rucinski, Russ; Sakla, Steve; /Fermilab

1995-02-20T23:59:59.000Z

271

Status of the SPIRAL I upgrade at GANIL  

SciTech Connect (OSTI)

The upgrade of the ''Systeme de Production d'Ions Radioactifs en Ligne'' phase I (SPIRAL I) installed at the ''Grand Accelerateur National d'Ions Lourds'' (GANIL) situated at Caen, France, is in progress and should be ready by 2014. In parallel, the first part of SPIRAL II facility is currently under construction. The global status of the upgrade is presented: goal, radioactive ion production systems, modification of the production cave and impact of the current safety re-evaluation of GANIL.

Jardin, P.; Bajeat, O.; Delahaye, P.; Dubois, M.; Feierstein, C.; Pellemoine, F.; Lecomte, P.; Leherissier, P.; Maunoury, L.; Saint-Laurent, M. G.; Traykov, E. [GANIL, Grand Accelerateur National d'Ions Lourds, CEA-DSM/CNRS-IN2P3, Blvd. H. Becquerel, BP 55027 14076 Caen Cedex 5 (France); Couratin, C. [LPC, Laboratoire de Physique Corpusculaire, CNRS-IN2P3/Universite de Caen Basse-Normandie/ENSICaen, Blvd. Marechal Juin, 14050 Caen Cedex (France)

2012-02-15T23:59:59.000Z

272

Project X functional requirements specification  

SciTech Connect (OSTI)

Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.

Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Kourbanis, I.; Lebedev, V.; Mishra, S.; Nagaitsev, S.; Solyak, N.; Tschirhart, R.; /Fermilab

2012-05-01T23:59:59.000Z

273

Web System Upgrading with Transaction Failure and Strategic This paper considers pricing and web system upgrading problems for an online retailer  

E-Print Network [OSTI]

1 Web System Upgrading with Transaction Failure and Strategic Customers Abstract: This paper considers pricing and web system upgrading problems for an online retailer facing a group of strategic period and identify the optimal policy for web system upgrading: there exists a threshold for each period

Xie, Jinxing

274

Fusion Energy Sciences Network Requirements  

E-Print Network [OSTI]

Division, and the Office of Fusion Energy Sciences. This isEnergy Sciences, DOE Office of Science Energy SciencesDepartment of Energy, Office of Science, Office of Advanced

Dart, Eli

2014-01-01T23:59:59.000Z

275

Fusion Energy Sciences Network Requirements  

E-Print Network [OSTI]

program to achieve ignition, to provide laser facility timeIgnition Facility National Institute for Fusion Science National LaserIgnition Facility (NIF). In support of the OMEGA Laser

Dart, Eli

2014-01-01T23:59:59.000Z

276

Fusion Energy Sciences Network Requirements  

E-Print Network [OSTI]

the world’s first reactor-scale fusion device in Cadarache,vital to fusion research, as the newest reactors are those

Dart, Eli

2014-01-01T23:59:59.000Z

277

In Home Networking using Optical Fiber  

Science Journals Connector (OSTI)

Increased bandwidth requirements for in-home networks create opportunities for optical fiber interconnects. We outline the requirements for in-home networking and discuss the...

Ten, Sergey

278

REPOWERING BAINBRIDGE AND BREMERTON WITH UPGRADES  

Broader source: Energy.gov [DOE]

Faced with a utility system capacity challenge that would have required a new substation and additional power lines across their community, the environmentally conscious residents of Bainbridge...

279

Weatherization Assistance Program Quality Work Plan Requirements  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization services and leverages the resources developed through the Guidelines for Home Energy Professionals project. Below you will find links to QWP guidance, as well as links to the individual requirements.

280

Digital I and C system upgrade integration technique  

SciTech Connect (OSTI)

This work developed an integration technique for digital I and C system upgrade, the utility can replace the I and C systems step by step systematically by this method. Inst. of Nuclear Energy Research (INER) developed a digital Instrumentation and Control (I and C) replacement integration technique on the basis of requirement of the three existing nuclear power plants (NPPs), which are Chin-Shan (CS) NPP, Kuo-Sheng (KS) NPP, and Maanshan (MS) NPP, in Taiwan, and also developed the related Critical Digital Review (CDR) Procedure. The digital I and C replacement integration technique includes: (I) Establishment of Nuclear Power Plant Digital Replacement Integration Guideline, (2) Preliminary Investigation on I and C System Digitalization, (3) Evaluation on I and C System Digitalization, and (4) Establishment of I and C System Digitalization Architectures. These works can be a reference for performing I and C system digital replacement integration of the three existing NPPs of Taiwan Power Company (TPC). A CDR is the review for a critical system digital I and C replacement. The major reference of this procedure is EPRI TR- 1011710 (2005) 'Handbook for Evaluating Critical Digital Equipment and Systems' which was published by the Electric Power Research Inst. (EPRI). With this document, INER developed a TPC-specific CDR procedure. Currently, CDR becomes one of the policies for digital I and C replacement in TPC. The contents of this CDR procedure include: Scope, Responsibility, Operation Procedure, Operation Flow Chart, CDR review items. The CDR review items include the comparison of the design change, Software Verification and Validation (SVandV), Failure Mode and Effects Analysis (FMEA), Evaluation of Diversity and Defense-in-depth (D3), Evaluation of Watchdog Timer, Evaluation of Electromagnetic Compatibility (EMC), Evaluation of Grounding for System/Component, Seismic Evaluation, Witness and Inspection, Lessons Learnt from the Digital I and C Failure Events. A solid review can assure the quality of the digital I and C system replacement. (authors)

Huang, H. W. [Inst. of Nuclear Energy Research (INER), No. 1000, Wenhua Road, Chiaan Village, Longtan Township, Taoyuan County, 32546, Taiwan (China); Shih, C. [Inst. of Nuclear Engineering and Science, National Tsing Hua Univ., 101, Sec. 2, Kuang Fu Rd, Hsinchu, Taiwan (China); Wang, J. R. [Inst. of Nuclear Energy Research (INER), No. 1000, Wenhua Road, Chiaan Village, Longtan Township, Taoyuan County, 32546, Taiwan (China); Huang, K. C. [Inst. of Nuclear Engineering and Science, National Tsing Hua Univ., 101, Sec. 2, Kuang Fu Rd, Hsinchu, Taiwan (China)

2012-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Harmonic measurements made on the upgraded New Zealand inter-island HVdc transmission system  

SciTech Connect (OSTI)

This paper introduces the recent upgrade to the New Zealand inter-island HVdc transmission system. It then details the procedure of one of several tests conducted to measure harmonic levels created by the upgraded transmission system. Harmonic levels were measured using the CHART (Continuous Harmonic Analysis in Real-Time) harmonic monitoring instrumentation. The connection of CHART to the high voltage network and its configuration during the test is discussed. A sample of results gathered while monitoring are presented, including characteristic harmonics of the converter, and maximum voltage and current levels up to the 50th harmonic for each of the three a.c. phases. During the tests one of the two a.c. harmonic filters was switched out to observe its effect on harmonic levels. It was found that with both a.c. harmonic filters operating, most harmonic levels were lower than with only one filter operating. However some harmonic levels, namely the 4th harmonic, were larger with both filters operating. The paper is concluded with a discussion of the results and of the difficulties encountered in measuring harmonics of very low level.

Miller, A.J.V.; Dewe, M.B. (Univ. of Canterbury, Christchurch (New Zealand))

1994-07-01T23:59:59.000Z

282

The water-gas shift (WGS) reaction (CO + H2O = CO2+ H2) is an important reaction for hydrogen upgrading during fuel  

E-Print Network [OSTI]

-treatment units in practical low-temperature PEM fuel cell systems, whereby the deleterious CO should be totally for hydrogen upgrading during fuel gas processing. Emerging applications in fuel cells require active, non-pyrophoric, and cost-effective catalysts. Along with a new group of platinum catalysts with atomically dispersed Pt

Napp, Nils

283

Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program |  

Broader source: Energy.gov (indexed) [DOE]

Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program Idaho Power - Easy Upgrades for Simple Retrofits Rebate Program < Back Eligibility Commercial Industrial Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Appliances & Electronics Construction Design & Remodeling Manufacturing Sealing Your Home Windows, Doors, & Skylights Ventilation Heat Pumps Commercial Lighting Lighting Insulation Maximum Rebate Up to 100,000 per site per year. Program Info Funding Source Conservation Program Funding Charge State Oregon Program Type Utility Rebate Program Rebate Amount A/C or Heat Pumps: $25-$100/ton Economizer Control Addition: $75/ton Air-Side Economizer Repair: $250 Evaporative Coolers: $100-$300/ton

284

Forsyth County Slashes Energy Bills with Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades September 30, 2010 - 12:04pm Addthis A new energy management system in Forsyth County’s 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County A new energy management system in Forsyth County's 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Four large projects funded through Recovery Act grant Energy efficient retrofits to save county about $72,000 annually Forsyth County, Georgia has been among the nation's fastest growing counties for the past ten years. Given the growth, officials are working

285

County Partners with Siemens on Energy Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Partners with Siemens on Energy Upgrades Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis What does this project do? Allows McHenry County to install cutting edge technology to reduce our energy costs. When you're really committed to energy efficiency and looking at $118,000 in potential energy savings annually, you want to share it. That's the view in McHenry County, Ill., which partnered with Siemens Building Technologies to launch mchenrycounty-eecbg.net to let residents understand the connection between recent energy efficiency projects and C02 emissions. The county, located outside the Chicago metropolitan area, was awarded $2,475,900 in Energy Efficiency and Conservation Block Grant (EECBG) funds through the Recovery Act in November. Through the Recovery Act-funded

286

Tax Incentives for Energy Efficiency Upgrades in Commercial Buildings |  

Broader source: Energy.gov (indexed) [DOE]

Energy Efficiency Upgrades in Commercial Energy Efficiency Upgrades in Commercial Buildings Tax Incentives for Energy Efficiency Upgrades in Commercial Buildings On this page you'll find information about the tax deductions available for improving the energy efficiency of commercial buildings, as well as links to qualified software available for calculating these savings. The Energy Policy Act of 2005 (EPACT) offered businesses tax deductions for the costs of improving the energy efficiency of commercial buildings. The Emergency Economic Stabilization Act of 2008 extended provisions in EPACT. The following tax incentives are available under this act. Deduction of the Cost of Energy-Efficient Property Installed in Commercial Buildings Make quick calculations of the estimated energy cost savings from

287

Non-Profit Brighter After Upgrade | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Non-Profit Brighter After Upgrade Non-Profit Brighter After Upgrade Non-Profit Brighter After Upgrade September 21, 2010 - 11:09am Addthis Loretta Prencipe Senior Communications Analyst, Office of Energy Efficiency & Renewable Energy In the Spring of 2010, the Arizona State Energy Program awarded Recovery Act funds to 14 non-profit organizations throughout the state for energy projects. One of the recipients, St. Vincent de Paul, is a human services organization that assists people in need throughout Central and Northern Arizona. The nonprofit partnered with Glendale, Arizona-based Natural Lighting Company to install skylights at the facility. In the above video, find out how this project is helping both the nonprofit and the local company. The video was created by Jim Arwood, an independent producer and former

288

Cool Roofs: An Easy Upgrade | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Cool Roofs: An Easy Upgrade Cool Roofs: An Easy Upgrade Cool Roofs: An Easy Upgrade December 14, 2010 - 9:25am Addthis Cathy Zoi Former Assistant Secretary, Office of Energy Efficiency & Renewable Energy What does this mean for me? Dark roofs can be 50 degrees hotter than light roofs. Combined with dark roads and parking lots, dark roofs lead to the 'urban heat island' effect: cities tend to be 2-5 degrees hotter. A cooler roof means energy bills that are up to 10-15% lower because your air conditioner doesn't have to work as hard. Check out Google Earth - the 'view from above' of your favorite American city. And look at the roofs of the office buildings, warehouses, shopping centers, and even the homes. Most of them are probably pretty dark in color - and this means they heat up a lot when the weather is warm -

289

When Energy Efficiency Upgrades and Ghost Stories Meet | Department of  

Broader source: Energy.gov (indexed) [DOE]

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Tertia Speiser Project Officer, Golden Field Office What are the key facts? New heating and cooling equipment has saved the Homewood Public Library thousands of dollars a year. It hasn't done anything about the ghosts, though. I've always thought that the best ghost stories are found in books. But what happens when the building where the books are kept is also a ghost story? Such may be the case with the award-winning public library in Homewood, Alabama, a city of 23,000 just south of Birmingham.

290

Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade | Department  

Broader source: Energy.gov (indexed) [DOE]

Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade Disneyland's Dry Cleaning Gets an Energy Efficient Upgrade March 16, 2011 - 2:58pm Addthis April Saylor April Saylor Former Digital Outreach Strategist, Office of Public Affairs What does this project do? In three hours, enough energy is recovered from the TMC to heat 15 loads of water for L&N's largest-capacity washing machine, and enough water is recovered to fill 1-1/2 loads of that same machine. As the provider of laundry and dry cleaning services for Disneyland Resort's costumes and hospitality supply items, L&N Costume and Linen Service knows a little something about both quantity and quality. Now, with the help of the Gas Technology Institute (GTI) and the Department of Energy, this forward-looking enterprise is embracing new, clean energy

291

County Partners with Siemens on Energy Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

County Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades County Partners with Siemens on Energy Upgrades July 9, 2010 - 11:11am Addthis What does this project do? Allows McHenry County to install cutting edge technology to reduce our energy costs. When you're really committed to energy efficiency and looking at $118,000 in potential energy savings annually, you want to share it. That's the view in McHenry County, Ill., which partnered with Siemens Building Technologies to launch mchenrycounty-eecbg.net to let residents understand the connection between recent energy efficiency projects and C02 emissions. The county, located outside the Chicago metropolitan area, was awarded $2,475,900 in Energy Efficiency and Conservation Block Grant (EECBG) funds through the Recovery Act in November. Through the Recovery Act-funded

292

Secretary of Energy Announces Approval and Funding for Facilities Upgrade  

Broader source: Energy.gov (indexed) [DOE]

Announces Approval and Funding for Facilities Announces Approval and Funding for Facilities Upgrade at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs Secretary of Energy Announces Approval and Funding for Facilities Upgrade at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs February 22, 2006 - 12:09pm Addthis NEWPORT NEWS , VA - Secretary of Energy Samuel W. Bodman today announced that President Bush's Fiscal Year 2007 budget request includes $7 million for the upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at Department of Energy's (DOE) Thomas Jefferson National Accelerator Facility. The secretary also visited with students and teachers from the Newport News area who participate in the lab's highly successful Becoming Enthusiastic about Math and Science (BEAMS) educational

293

Builder Brings Tradition to Efficient Home Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Builder Brings Tradition to Efficient Home Upgrades Builder Brings Tradition to Efficient Home Upgrades Builder Brings Tradition to Efficient Home Upgrades October 15, 2009 - 5:51pm Addthis Joshua DeLung When Tom Wade's grandfather started building single-family homes, he may not have imagined how far his grandson would take the practice. Tom's father followed in the family footsteps and founded Artistic Homes in Albuquerque, N.M., in the mid-1980s. Now, Tom has led the company from simply building quality, affordable homes to innovating ones that are highly energy-efficient. "My grandfather would absolutely love what we're doing today because he had an incredible passion for - and an interest in - craftsmanship and improving the product, which in this case is the home," Tom says. "The fact that we're using science and technology is something he would

294

Energy Upgrade Program Revitalizing Oregon | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Energy Upgrade Program Revitalizing Oregon Energy Upgrade Program Revitalizing Oregon Energy Upgrade Program Revitalizing Oregon May 28, 2010 - 2:38pm Addthis Joshua DeLung What does this project do? Local businesses in 13 communities are getting energy makeovers in an effort to help business owners save hundreds of dollars each year and revitalize downtown areas. 'Main streets' in Clackamas County, Oregon, are undergoing a makeover - an energy-efficiency makeover. As part of the Clackamas County Energy Efficiency on Main Street Program, local businesses in 13 communities are getting energy makeovers in an effort to help business owners save hundreds of dollars each year and revitalize downtown areas. First to save The program needed a guinea pig to be the first to receive a free energy audit and found a willing participant in Key Carpets, a Molalla-based store

295

Forsyth County Slashes Energy Bills with Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades Forsyth County Slashes Energy Bills with Upgrades September 30, 2010 - 12:04pm Addthis A new energy management system in Forsyth County’s 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County A new energy management system in Forsyth County's 52,057 square foot courthouse is expected to save about $9,000 annually. | Photo courtesy of Forsyth County Maya Payne Smart Former Writer for Energy Empowers, EERE What are the key facts? Four large projects funded through Recovery Act grant Energy efficient retrofits to save county about $72,000 annually Forsyth County, Georgia has been among the nation's fastest growing counties for the past ten years. Given the growth, officials are working

296

Microsoft Word - CX_MerrittRadioStationUpgrade_2013.docx  

Broader source: Energy.gov (indexed) [DOE]

8, 2013 8, 2013 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Merritt Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19 Microwave, meteorological, and radio towers Location: Winton, Chelan County, WA Township 26N, Range 16E, and Section 2 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Merritt Radio Station in the Wenatchee River Ranger District of the Okanogan-Wenatchee National Forest (USFS). The proposed radio station upgrade would replace the existing communication building, electrical service, and propane tank with a new building and propane tank in adjacent locations on the

297

SLHC, the High-Luminosity Upgrade (public event)  

ScienceCinema (OSTI)

In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

None

2011-10-06T23:59:59.000Z

298

Living Comfortably: A Consumer's Guide to Home Energy Upgrades |  

Broader source: Energy.gov (indexed) [DOE]

Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades Living Comfortably: A Consumer's Guide to Home Energy Upgrades March 7, 2013 - 3:15pm Addthis A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL A weatherization worker drills holes to blow cellulose insulation in the interior walls of this home. | Photo courtesy of Dennis Schroeder, NREL Dr. Richard Knaub Project Leader in Weatherization & Workforce Development at the National Renewable Energy Laboratory Energy audit tools An infrared camera can display temperature differences between surfaces and help determine if a wall is insulated. It can show drafts and moisture, which can lead to mold problems.

299

When Energy Efficiency Upgrades and Ghost Stories Meet | Department of  

Broader source: Energy.gov (indexed) [DOE]

When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet When Energy Efficiency Upgrades and Ghost Stories Meet October 31, 2011 - 5:21pm Addthis Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Homewood Public Library at Night | Photo Courtesy of Homewood Public Library Tertia Speiser Project Officer, Golden Field Office What are the key facts? New heating and cooling equipment has saved the Homewood Public Library thousands of dollars a year. It hasn't done anything about the ghosts, though. I've always thought that the best ghost stories are found in books. But what happens when the building where the books are kept is also a ghost story? Such may be the case with the award-winning public library in Homewood, Alabama, a city of 23,000 just south of Birmingham.

300

Process and economic model of in-field heavy oil upgrading using aqueous pyrolysis  

SciTech Connect (OSTI)

A process and economic model for aqueous pyrolysis in-field upgrading of heavy oil has been developed. The model has been constructed using the ASPEN PLUS chemical process simulator. The process features cracking of heavy oil at moderate temperatures in the presence of water to increase oil quality and thus the value of the oil. Calculations with the model indicate that for a 464 Mg/day (3,000 bbl/day) process, which increases the oil API gravity of the processed oil from 13.5{degree} to 22.4{degree}, the required value increase of the oil would need to be at least $2.80/Mg{center_dot}{degree}API($0.40/bbl{center_dot}{degree}API) to make the process economically attractive. This level of upgrading has been demonstrated in preliminary experiments with candidate catalysts. For improved catalysts capable of having the coke make and increasing the pyrolysis rate, a required price increase for the oil as low as $1.34/Mg{center_dot}{degree}API ($0.21/bbl{center_dot}{degree}API)has been calculated.

Thorsness, C. B., LLNL

1997-01-21T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

Building Upgrade Manual | ENERGY STAR Buildings & Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Building Upgrade Manual Building Upgrade Manual Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In This Section Campaigns Commercial building design Communications resources Energy management guidance Financial resources Portfolio Manager Products and purchasing Recognition Research and reports Service and product provider (SPP) resources Success stories Target Finder

302

ENERGY STAR Building Upgrade Manual | ENERGY STAR Buildings & Plants  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

ENERGY STAR Building Upgrade Manual ENERGY STAR Building Upgrade Manual Secondary menu About us Press room Contact Us Portfolio Manager Login Facility owners and managers Existing buildings Commercial new construction Industrial energy management Small business Service providers Service and product providers Verify applications for ENERGY STAR certification Design commercial buildings Energy efficiency program administrators Commercial and industrial program sponsors Associations State and local governments Federal agencies Tools and resources Training In this section Learn the benefits Get started Use Portfolio Manager Save energy Stamp out energy waste Find cost-effective investments Engage occupants Purchase energy-saving products Put computers to sleep Get help from an expert Take a comprehensive approach

303

Phoenix Overcomes Barriers and Energizes Homeowners to Make Upgrades  

Broader source: Energy.gov [DOE]

Energize Phoenix is saving energy and money for homeowners, generating jobs, and transforming a diverse array of neighborhoods along a 10-mile stretch of the city's light rail line. Energize Phoenix's residential programs are open to homeowners of all income levels, but low-to-moderate income homeowners may realize greater benefits from energy efficiency upgrades because their homes often have older, inefficient equipment. Because upfront costs can deter low- to moderate-income residents from making upgrades, Energize Phoenix developed two programs to specifically address energy efficiency with this audience.

304

HFC-6000 for Nuclear I and C Upgrade  

SciTech Connect (OSTI)

The scalability of the HFC-6000 product line makes it an effective solution for nuclear power plant I and C upgrade applications. Its 19-in. rack-mounted platform provides a modular structure whose components can be used for many different nuclear power plant safety applications. This single-platform solution reduces the overall complexity of I and C implementation by minimizing operational and maintenance requirements. The HFC-6000 product line is designed to operate with either single or multiple control remote units in each channel. The main controller module in a remote unit is the system controller (HFCSBC06), which executes control logic programs, I/O scan, and C-Link communication. All three functions are handled by dedicated 64/32-bit microprocessors. A redundant configuration of system controllers consists of two HFC-SBC06 modules and one HFC-DPM06 dual-ported memory module. The hardware interface with external peripheral equipment is provided by an HFC-PCC06 peripheral interface module in the same rack. This module communicates with dedicated Control Switch Modules (the operator interface for digital control) and M/A stations (the operator interface for analog control), which are mounted on the plant main control board. Individual input/output modules serve as the hardware interface with the field devices under control and are implemented by different types of I/O modules. Each I/O module has a redundant serial communication interface. This serial interface employs a proprietary poll-response intercommunication link (ICL) protocol for communication with the system controllers. When a remote is configured with redundant controllers, the two ICL interfaces on each I/O module are connected to separate system controllers to create a redundant link. The I/O modules can be installed locally or remotely. If the I/O modules are physically remote from the controller, the ICL can be implemented with fiber optics to provide physical and electrical isolation from non-safety components. An HFC-FPD06 Flat Panel Display Module can be used as a human-machine interface (HMI). This HMI is composed of a qualified flat panel display and an HFC-FPC06 FPD controller. The FPC06 module has hardware interfaces for both the ICL and the fast Ethernet C-Link. It is configured as a subordinate to the HFC-SBC06 system controller and controls graphic displays on the HMI; it can also perform data voting and validation functions for redundant or triple redundant safety channels. The HFC-FPC06 can be used in either single or redundant configurations. The Power Supply Module consists of a redundant, rack-mounted power supply set. The typical configuration provides 24-vdc for all logic functions and 48-vdc for excitation power. Individual power supplies are redundant and hot swappable. Currently, HFC-6000 system is being installed in Kori Units no.1 to no.4 for its AAC D/G control and monitoring system and several other NPP I and C upgrade projects. (authors)

Taylor, Jonathan; Hsu, Allen; Gerardis, Terry; Stevens, John; McCreary, Tim; Yang, Steve [HF Controls Corporation, 16650 Westgrove Dr., Suite 500s (United States)

2006-07-01T23:59:59.000Z

305

Modeling diffusion of innovations in a social network X. Guardiola,1  

E-Print Network [OSTI]

Modeling diffusion of innovations in a social network X. Guardiola,1 A. Di´az-Guilera,1 C. J. Pe model of diffusion of innovations in a social network with upgrading costs is introduced. Agents of diffusion of innovations in a social network. In order to un- derstand the complex behavior of technology

Diaz-Guilera, Albert

306

Energy Efficiency Upgrades Make a Big Difference to a Small Organizati...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Efficiency Upgrades Make a Big Difference to a Small Organization Energy Efficiency Upgrades Make a Big Difference to a Small Organization Photo of a man and woman standing outside...

307

Q&A: Financing Energy Efficiency Upgrades for Your Home through...  

Office of Environmental Management (EM)

Q&A: Financing Energy Efficiency Upgrades for Your Home through PowerSaver Loans Q&A: Financing Energy Efficiency Upgrades for Your Home through PowerSaver Loans February 19, 2015...

308

Project L-070, ``300 Area process sewer piping system upgrade`` Project Management Plan  

SciTech Connect (OSTI)

This document is the project management plan for Project L-070, 300 Area process sewer system upgrades.

Wellsfry, H.E.

1994-09-16T23:59:59.000Z

309

Upgrade LCDs or TVs with improved ergonomic adjustability  

E-Print Network [OSTI]

Highlights · Upgrade LCDs or TVs with improved ergonomic adjustability · Constant Force (CFTM comfort and productivity · 5 (130 mm) height range easily meets the ergonomic height needs of the average compliant Product Sheet Affordable desktop ergonomics Neo-FlexTM LCD Stand 870-05-067, rev. 03/08/07 www

Saskatchewan, University of

310

Runner upgrading: Learning from Ontario Hydro`s experience  

SciTech Connect (OSTI)

Planning, design, and implementation of turbine runner replacement at Ontario Hydro is described in the article. The use of fully homologous modeling for upgrade projects, including both francis and propeller runner types, is outlined. Confirmation of physical model efficiency is obtained through numerical modeling. Inlet connections, setting cavitation-erosion guarantees, and other guarantees included in tender documents are also described in some detail.

Kee, D.C.; Markovich, M.S.; Munro, R.I. [Ontario Hydro (Canada)

1997-02-01T23:59:59.000Z

311

Ash Deposition Behavior of Upgraded Brown Coal and Bituminous Coal  

Science Journals Connector (OSTI)

Ash Deposition Behavior of Upgraded Brown Coal and Bituminous Coal ... Ash with a low melting point causes slagging and fouling problems in pulverized coal combustion boilers. ... The ash composition in coal and operational conditions in boilers such as heat load greatly affect the ash deposition behavior. ...

Katsuya Akiyama; Haeyang Pak; Toshiya Tada; Yasuaki Ueki; Ryo Yoshiie; Ichiro Naruse

2010-07-22T23:59:59.000Z

312

Employee-Focused Structure Helps Produce Upgrades for Contractor  

Broader source: Energy.gov [DOE]

Progressive Building Solutions, an energy efficiency contractor participating in Seattle, Washington's Community Power Works program, has an intriguing model to help its employees feel connected to the company's success—employees are part owners. The company's creator, Suraj Lobo, built Progressive Energy Solutions around three pillars: employee ownership; development of energy efficiency best practices; and superior energy upgrade work.

313

Westover ARB Fuel Hydrant System Upgrade set to begin  

E-Print Network [OSTI]

Westover ARB Fuel Hydrant System Upgrade set to begin Story on page 4 #12;2 YANKEE ENGINEER August, many along the East Coast felt the impact of Hurricane Sandy, one of the largest hurricanes in history's way. · Make sure to fully charge your cell phone or other mobile devices so you can communicate after

US Army Corps of Engineers

314

T Plant secondary containment and leak detection upgrades  

SciTech Connect (OSTI)

The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site.

Carlson, T.A.

1995-10-19T23:59:59.000Z

315

K.K. Gan ATLAS Tracker Upgrade Workshop 1 Progress Report on Joint ATLAS/CMS  

E-Print Network [OSTI]

K.K. Gan ATLAS Tracker Upgrade Workshop 1 Progress Report on Joint ATLAS/CMS SLHC Opto ATLAS Tracker Upgrade Workshop 2 Outline Introduction Subgroups activities Summary #12;K.K. Gan ATLAS System #12;K.K. Gan ATLAS Tracker Upgrade Workshop 4 Group A: Lesson Learned and to be Learned from LHC

Gan, K. K.

316

ATLAS ID Upgrade R&D Plan: Development of a Short-Strip Silicon Detector Module  

E-Print Network [OSTI]

ATLAS ID Upgrade R&D Plan: Development of a Short-Strip Silicon Detector Module and a Frontend of the optimum technology and layout of the tracking detectors for the upgraded ATLAS ID. The goal for the intermediate tracking region in the upgraded ATLAS ID. We anticipate that much of the work would then also

California at Santa Cruz, University of

317

Low rank coal upgrading in a flow of hot water  

SciTech Connect (OSTI)

Simultaneous hydrothermal degradation and extraction at around 350{sup o}C using flowing solvent as a reaction/extraction medium were proposed for upgrading brown coal, more specifically, for converting brown coal into several fractions having different molecular weight and chemical structure under mild conditions. When an Australian brown coal, Loy Yang coal, was treated by water at 350{sup o}C under 18 MPa, the coal was separated into four fractions: gaseous product by 8% yield, water-soluble extract at room temperature (soluble) by 23% yield, extract precipitates as solid at room temperature (deposit) by 23% yield, and residual coal (upgraded coal) by 46% yield on daf basis. The separation was found to be realized by in situ extraction of low-molecular-weight substances released from coal macromolecular structure and/or those generated by hydrothermal decomposition reactions at 350{sup o}C. The solid products obtained, deposit and upgraded coal, were characterized in detail to examine the possibility of their effective utilization as solid fuel and chemical feed stock. The upgraded coal showed higher heating value and higher gasification reactivity than the parent coal, indicating that the upgraded coal can be a better solid fuel than the parent coal. The solid extract, deposit, was found to show thermoplasticity at less than 200{sup o}C, suggesting the possibility of utilizing the deposit as a raw material of high performance carbon materials. Several variables affecting the performance of the proposed method are also examined in detail in this paper. 12 refs., 8 figs., 3 tabs.

Masato Morimoto; Hiroyuki Nakagawa; Kouichi Miura [Kyoto University, Kyoto (Japan). Department of Chemical Engineering

2009-09-15T23:59:59.000Z

318

High Temperature Calcination - MACT Upgrade Equipment Pilot Plant Test  

SciTech Connect (OSTI)

About one million gallons of acidic, hazardous, and radioactive sodium-bearing waste are stored in stainless steel tanks at the Idaho Nuclear Technology and Engineering Center (INTEC), which is a major operating facility of the Idaho National Engineering and Environmental Laboratory. Calcination at high-temperature conditions (600 C, with alumina nitrate and calcium nitrate chemical addition to the feed) is one of four options currently being considered by the Department of Energy for treatment of the remaining tank wastes. If calcination is selected for future processing of the sodium-bearing waste, it will be necessary to install new off-gas control equipment in the New Waste Calcining Facility (NWCF) to comply with the Maximum Achievable Control Technology (MACT) standards for hazardous waste combustors and incinerators. This will require, as a minimum, installing a carbon bed to reduce mercury emissions from their current level of up to 7,500 to <45 {micro}g/dscm, and a staged combustor to reduce unburned kerosene fuel in the off-gas discharge to <100 ppm CO and <10 ppm hydrocarbons. The staged combustor will also reduce NOx concentrations of about 35,000 ppm by 90-95%. A pilot-plant calcination test was completed in a newly constructed 15-cm diameter calciner vessel. The pilot-plant facility was equipped with a prototype MACT off-gas control system, including a highly efficient cyclone separator and off-gas quench/venturi scrubber for particulate removal, a staged combustor for unburned hydrocarbon and NOx destruction, and a packed activated carbon bed for mercury removal and residual chloride capture. Pilot-plant testing was performed during a 50-hour system operability test January 14-16, followed by a 100-hour high-temperature calcination pilot-plant calcination run January 19-23. Two flowsheet blends were tested: a 50-hour test with an aluminum-to-alkali metal molar ratio (AAR) of 2.25, and a 50-hour test with an AAR of 1.75. Results of the testing indicate that sodium-bearing waste can be successfully calcined at 600 C with an AAR of 1.75. Unburned hydrocarbons are reduced to less than 10 ppm (7% O2, dry basis), with >90% reduction of NOx emissions. Mercury removal by the carbon bed reached 99.99%, surpassing the control efficiency needed to meet MACT emissions standards. No deleterious impacts on the carbon bed were observed during the tests. The test results imply that upgrading the NWCF calciner with a more efficient cyclone separator and the proposed MACT equipment can process the remaining tanks wastes in 3 years or less, and comply with the MACT standards.

Richard D. Boardman; B. H. O'Brien; N. R. Soelberg; S. O. Bates; R. A. Wood; C. St. Michel

2004-02-01T23:59:59.000Z

319

HYBRID SULFUR RECOVERY PROCESS FOR NATURAL GAS UPGRADING  

SciTech Connect (OSTI)

This second quarter report of 2002 describes progress on a project funded by the U.S. Department of Energy (DOE) to test a hybrid sulfur recovery process for natural gas upgrading. The process concept represents a low cost option for direct treatment of natural gas streams to remove H{sub 2}S in quantities equivalent to 0.2-25 metric tons (LT) of sulfur per day. This process is projected to have lower capital and operating costs than the competing technologies, amine/aqueous iron liquid redox and amine/Claus/tail gas treating, and have a smaller plant footprint, making it well suited to both on-shore and offshore applications. CrystaSulf (service mark of CrystaTech, Inc.) is a new nonaqueous sulfur recovery process that removes hydrogen sulfide (H{sub 2}S) from gas streams and converts it into elemental sulfur. CrystaSulf features high sulfur recovery similar to aqueous-iron liquid redox sulfur recovery processes, but differs from the aqueous processes in that CrystaSulf controls the location where elemental sulfur particles are formed. In the hybrid process, approximately 1/3 of the total H{sub 2}S in the natural gas is first oxidized to SO{sub 2} at low temperatures over a heterogeneous catalyst. Low temperature oxidation is done so that the H{sub 2}S can be oxidized in the presence of methane and other hydrocarbons without oxidation of the hydrocarbons. The project involves the development of a catalyst using laboratory/bench-scale catalyst testing, and then demonstration of the catalyst at CrystaTech's pilot plant in west Texas. Previous reports described development of a catalyst with the required selectivity and efficiency for producing sulfur dioxide from H{sub 2}S. In the laboratory, the catalyst was shown to be robust and stable in the presence of several intentionally added contaminants, including condensate from the pilot plant site. This report describes testing using the laboratory apparatus but operated at the pilot plant using the actual pilot plant gas, which contains far more contaminants than can be simulated in the laboratory. The results are very encouraging, with stable and efficient operation being obtained for a prolonged period of time.

Girish Srinivas; Steven C. Gebhard; David W. DeBerry

2002-07-01T23:59:59.000Z

320

The feasibility of replacing or upgrading utility distribution transformers during routine maintenance  

SciTech Connect (OSTI)

It is estimated that electric utilities use about 40 million distribution transformers in supplying electricity to customers in the United States. Although utility distribution transformers collectively have a high average efficiency, they account for approximately 61 billion kWh of the 229 billion kWh of energy lost annually in the delivery of electricity. Distribution transformers are being replaced over time by new, more efficient, lower-loss units during routine utility maintenance of power distribution systems. Maintenance is typically not performed on units in service. However, units removed from service with appreciable remaining life are often refurbished and returned to stock. Distribution transformers may be removed from service for many reasons, including failure, over- or underloading, or line upgrades such as voltage changes or rerouting. When distribution transformers are removed from service, a decision must be made whether to dispose of the transformer and purchase a lower-loss replacement or to refurbish the transformer and return it to stock for future use. This report contains findings and recommendations on replacing utility distribution transformers during routine maintenance, which is required by section 124(c) of the Energy Policy Act of 1992. The objectives of the study are to evaluate the practicability, cost-effectiveness, and potential energy savings of replacing or upgrading existing transformers during routine utility maintenance and to develop recommendations on was to achieve the potential energy savings.

Barnes, P.R.; Van Dyke, J.W.; McConnell, B.W.; Cohn, S.M.; Purucker, S.L.

1995-04-01T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

F/H Effluent Treatment Facility filtration upgrade alternative evaluations overview  

SciTech Connect (OSTI)

The F/H Effluent Treatment Facility (ETF) at the Savannah River Site (SRS) was designed to treat process wastewater from the 200-F/H Production Facilities (routine wastewater) as well as intermittent flows from the F/H Retention Basins and F/H Cooling Water Basins (nonroutine wastewater). Since start-up of the ETF at SRS in 1988, the treatment process has experienced difficulties processing routine and nonroutine wastewater. Studies have identified high bacteria and bacterial decomposition products in the wastewater as the cause for excessive fouling of the filtration system. In order to meet Waste Management requirements for the treatment of processed wastewater, an upgrade of the ETF filtration system is being developed. This upgrade must be able to process the nonroutine wastewater at design capacity. As a result, a study of alternative filter technologies was conducted utilizing simulated wastewater. The simulated wastewater tests have been completed. Three filter technologies, centrifugal polymeric ultrafilters, tubular polymeric ultrafilters, and backwashable cartridge filters have been selected for further evaluation utilizing actual ETF wastewater.

Miles, W.C. Jr.; Poirier, M.R.; Brown, D.F.

1992-07-01T23:59:59.000Z

322

The Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Network Engineering Services The Network Network Maps Network Facts & Stats Connected Sites Peering Connections ESnet Site Availabiliy OSCARS Fasterdata IPv6 Network Network...

323

MFRSR Head Refurbishment, Data Logger Upgrade and Calibration Improvements  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MFRSR Head Refurbishment, Data Logger Upgrade MFRSR Head Refurbishment, Data Logger Upgrade and Calibration Improvements Gary Hodges, CIRES/NOAA and John Schmelzer, PNL gary.hodges@noaa.gov, john.schmelzer@pnl.gov 17th Annual ARM Science Team Meeting 26-30 March 2006 Monterey, CA Head Refurbishment The Process Includes: * New filter detectors * Relocate internal thermistors * New connectors * Gain resistors moved to head * Improved insulation The Finished Heads: * Are lamp calibrated * Have filter profiles measured * Cosine characterized * Are out-of-band tested What Does This Mean For Data Users? * Fewer data gaps * Fewer DQRs * Confidence in the data * Well calibrated data Calibration Improvements 5 6 7 8 0 2 4 6 Airmass ln Direct Data will now be calibrated by the Langley method Extrapolate to TOA to get V 0 Benefits of Langley vs. Lamp calibrations:

324

HERA Luminosity Upgrade Magnet Production | Superconducting Magnet Division  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

HERA Luminosity Upgrade Magnet Production HERA Luminosity Upgrade Magnet Production Photos taken on or before 12-May-2000. GO horizontal test setup GO horizontal test setup view toward lead tower GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup lead tower feedthroughs Close up of lead tower feedthroughs lead tower feedthroughs Close up of lead tower feedthroughs lead tower feedthroughs Close up of lead tower feedthroughs GO horizontal test setup GO horizontal test setup GO horizontal test setup GO horizontal test setup GO Coldmass GO Coldmass GO sextupole coil GO sextupole coil GO quadrupole coil lead end GO quadrupole coil lead end

325

Microsoft Word - CX_TunkRadioStationUpgrade_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

May 30, 2012 May 30, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Tunk Mountain Radio Station Upgrade Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Synarep, Okanogan County, WA Township 35N, Range 29E, and Section 8 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA plans to upgrade its Tunk Mountain Radio Station in the Tonasket Ranger District of the Okanogan-Wenatchee National Forest. BPA is coordinating with the U.S. Forest Service (USFS) to ensure the existing land use permit is

326

Microsoft Word - AlbionButteRSCommunicationUpgrade-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

4, 2011 4, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Albion Butte Radio Station Communication Upgrade Budget Information: Work Order # 00253466 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Location: Cassia County, Idaho - Section 19, Township 11 South, Range 26 East of the Nibbs Creek Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade the communication building and equipment at BPA's Albion Butte Radio Station located in Cassia County, ID. This project is part of an

327

Microsoft Word - Holcomb and Naselle Communication Upgrade CX.doc  

Broader source: Energy.gov (indexed) [DOE]

6, 2011 6, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Holcomb Radio Station and Naselle Substation Communication Upgrade Project Budget Information: Work Order # 00253203 and # 00253206 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Locations: Holcomb Radio Station: Pacific County, Washington - Township 13 North, Range 7 West, Section 30 of the Lebam Quadrangle Naselle Substation: Pacific County, Washington - Township 10 North, Range 9 West, Section 4 of the Oman Ranch Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA is proposing to upgrade the communication equipment at

328

Investment and Upgrade in Distributed Generation under Uncertainty  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Investment and Upgrade in Distributed Generation under Uncertainty Investment and Upgrade in Distributed Generation under Uncertainty Speaker(s): Afzal Siddiqui Karl Maribu Date: September 4, 2008 - 12:00pm Location: 90-3122 Seminar Host/Point of Contact: Galen Barbose The ongoing deregulation of electricity industries worldwide is providing incentives for microgrids to use small-scale distributed generation (DG) and combined heat and power (CHP) applications via heat exchangers (HXs) to meet local energy loads. Although the electric-only effciency of DG is lower than that of central-station production, relatively high tariff rates and the potential for CHP applications increase the attractiveness of on-site generation. Nevertheless, a microgrid contemplating the installation of gas-fired DG has to be aware of the uncertainty in the

329

Microsoft Word - Lower-MidColumbia-Upgrade-CX.doc  

Broader source: Energy.gov (indexed) [DOE]

3, 2010 3, 2010 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Steve Prickett Project Manager - TEP Proposed Action: Lower Mid-Columbia / Midway-Vantage 230-kV Transmission Line Upgrade Project Budget Information: Work Order #238901 and #231311, Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 "Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility..." B4.7 Adding fiber optic cable to transmission structures or burying fiber optic cable in existing transmission line rights-of-way. B4.13 "Reconstruction (upgrading or rebuilding) and/or minor relocation of existing electric powerlines

330

Microsoft Word - CX_MetalineRadioStationUpgrade_2012.docx  

Broader source: Energy.gov (indexed) [DOE]

July 11, 2012 July 11, 2012 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearance Memorandum Ben Deschuytter Project Manager - TEP-CSB-1 Proposed Action: Metaline Radio Station Upgrade Project Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.19- Siting/construction/operation of microwave/radio communication towers Location: Metaline Falls, Pend Orielle County, WA Township 40N, Range 43E, Section 31 Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to upgrade its Metaline Radio Station in the Sullivan Lake Ranger District of the Colville National Forest. BPA is coordinating with the US Forest Service (USFS) to ensure the existing land use agreement is modified to adequately address

331

Interaction Region Upgrades of e+ e- B-Factories  

SciTech Connect (OSTI)

Both the PEP-II and KEKB B-Factories have plans to upgrade their Interaction Regions (IRs) in order to improve luminosity performance. Last summer PEP-II added cooling to the IR beam pipe in order to increase beam currents thereby raising the luminosity. In addition, PEP-II is working on a design that modifies the permanent magnets near the Interaction Point (IP) for an even higher luminosity increase. KEKB is also planning an improvement to their IR that will decrease the detector beam pipe radius. In addition, KEK has a design to increase the luminosity of KEKB to 1 x 10{sup 35} cm{sup -2} sec{sup -1} which includes changes to the IR. PEP-II is also investigating the feasibility of a 1 x 10{sup 36} cm{sup -2} sec{sup -1} luminosity design. I summarize these various upgrades and concentrate on issues common to the different designs.

Sullivan, M.; /SLAC

2008-02-22T23:59:59.000Z

332

Upgrade of the proximity focusing RICH at Jlab  

SciTech Connect (OSTI)

The Hall A RICH at Jefferson Lab is undergoing an upgrade to adapt to the higher momentum kinematics of the neutron spin structure Transversity experiments planned to run in 2008. The JLab RICH is a proximity focusing detector using liquid C6F14 as Cherenkov radiator, a thin layer of CsI as photon converter, evaporated on segmented pad panels of a proportional chamber. The original RICH had a superior hadron identification up to 2 GeV/c with pion/kaon rejection at the level of 1:1000 at ~ similar90% intrinsic efficiency. The upgrade will extend this performance above 2.4 GeV/c by means of a larger photon detector (a multiwire-multipad proportional chamber) and a longer proximity gap which will improve the photon detection geometrical efficiency and the angular resolution, respectively.

Cisbani, Evaristo; Colilli, Stefano; Cusanno, Francesco; Fratoni, Rolando; Frullani, Salvatore; Garibaldi, Franco; Giuliani, Fausto; Gricia, Massimo; Lucentini, Maurizio; Santavenere, Fabio; Urciuoli, Guido; Iodice, Mauro; Argentieri, A.; de Cataldo, Giacinto; De Leo, Raffaele; Lagamba, Luigi; Marrone, Stefano; Nappi, E.; Camsonne, Alexandre; Kross, Brian; Michaels, Robert; Reitz, Bodo; Segal, John; Wojtsekhowski, Bogdan; Zorn, Carl; Monno, E.; Breuer, Herbert

2009-09-01T23:59:59.000Z

333

Phased approach to the LHC Insertion Upgrade and Magnet Challenges  

E-Print Network [OSTI]

The LHC is on its way for operation with beam in 2008. The first goal of CERN and the LHC community is to ensure that the collider is operated efficiently, gradually reaching its maximal performance. In parallel, discussions have started and there is already a wealth of ideas on the possible directions for upgrading the LHC insertions. In this talk, we illustrate some of the constraints limiting the upgrade scenarios, and argue that a phased approach with several intermediate targets is necessary. In the first phase, the known bottleneck in the low-? triplets needs to be removed in the perspective of the physics run of 2013. This phase relies on the mature Nb-Ti superconducting magnet technology, where improvements for a small scale production are still possible.

Ostojic, R

2008-01-01T23:59:59.000Z

334

Using EPICS enabled industrial hardware for upgrading control systems  

SciTech Connect (OSTI)

Los Alamos National Laboratory has been working with National Instruments (NI) and Cosy lab to implement EPICS Input Output Controller (IOC) software that runs directly on NI CompactRIO Real Time Controller (RTC) and communicates with NI LabVIEW through a shared memory interface. In this presentation, we will discuss our current progress in upgrading the control system at the Los Alamos Neutron Science Centre (LANSCE) and what we have learned about integrating CompactRIO into large experimental physics facilities. We will also discuss the implications of using Channel Access Server for LabVIEW which will enable more commercial hardware platforms to be used in upgrading existing facilities or in commissioning new ones.

Bjorkland, Eric A [Los Alamos National Laboratory; Veeramani, Arun [NATIONAL INSTRUMENTS; Debelle, Thierry [NATIONAL INSTRUMENTS

2009-01-01T23:59:59.000Z

335

Microwave interferometer for plasma-density measurement on TMX Upgrade  

SciTech Connect (OSTI)

A four-channel microwave interferometer operating at 140 GHz has been designed for installation on the upgrade to the Tandem Mirror Experiment (TMX Upgrade). The instrument can be used to measure plasma density simultaneously at four locations: by reconnecting the waveguide runs, density can be measured at other locations of interest. The design is an outgrowth of a system used on TMX, but includes some newly developed hardware. An over-mode circular waveguide system is used to transport the signals over long distances with only moderate losses. Several precautions have been taken to limit the effect of possible interference from the electron cyclotron resonant heating (ECRH) system used to heat the plasma. A high-resolution linear phase comparator has been designed that will operate over the wide range of signals expected. A CAMAC-based data-acquisition system provides for automatic data sampling and archival after each shot.

Coffield, F.E.; Stever, R.D.; Lund, N.P.

1981-09-25T23:59:59.000Z

336

2 MW upgrade of the Fermilab Main Injector  

SciTech Connect (OSTI)

In January 2002, the Fermilab Director initiated a design study for a high average power, modest energy proton facility. An intensity upgrade to Fermilab's 120-GeV Main Injector (MI) represents an attractive concept for such a facility, which would leverage existing beam lines and experimental areas and would greatly enhance physics opportunities at Fermilab and in the U.S. With a Proton Driver replacing the present Booster, the beam intensity of the MI is expected to be increased by a factor of five. Accompanied by a shorter cycle, the beam power would reach 2 MW. This would make the MI a more powerful machine than the SNS or the J-PARC. Moreover, the high beam energy (120 GeV) and tunable energy range (8-120 GeV) would make it a unique high power proton facility. The upgrade study has been completed and published. This paper gives a summary report.

Weiren Chou

2003-06-04T23:59:59.000Z

337

Federal Finance Facilities Available for Energy Efficiency Upgrades  

Broader source: Energy.gov (indexed) [DOE]

Finance Facilities Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2 Contents 1 Foreword ................................................................................................................................... 5 2 Acknowledgements ................................................................................................................... 6 3 Federal Finance Facilities At-A-Glance ................................................................................... 7 3.1 Matrix of Federal Finance Facilities by Type and Agency .............................................. 7 4 Profiles of Federal Finance Facilities Available for Clean Energy .......................................... 8

338

Plasma diagnostics for the DIII?D divertor upgrade (abstract)  

Science Journals Connector (OSTI)

The DIII?D tokamak is being upgraded to allow for divertor biasing baffling and pumping experiments. This paper gives an overview of the new diagnostics added to DIII?D as part of this advanced divertor program. They include tile current monitors fast reciprocating Langmuir probes a fixed probe array in the divertor fast neutral pressure gauges and H? measurements with TV cameras and fiber optics coupled to a high?resolution spectrometer.

D. N. Hill; A. Futch; D. Buchenauer; R. Doerner; R. Lehmer; L. Schmitz; C. C. Klepper; M. Menon; B. Leikind; S. Lippmann; M. A. Mahdavi; M. Schaffer; J. Smith; J. Salmonson; J. Watkins

1990-01-01T23:59:59.000Z

339

Plasma diagnostics for the DIII?D divertor upgrade  

Science Journals Connector (OSTI)

The DIII?D tokamak is being upgraded to allow for divertor biasing baffling and pumping experiments. This paper gives an overview of the new diagnostics added to DIII?D as part of this advanced divertor program. They include tile current monitors fast reciprocating Langmuir probes a fixed probe array in the divertor fast neutral pressure gauges and H?measurements with TV cameras and fiber optics coupled to a high?resolution spectrometer.

D. N. Hill; A. Futch; D. Buchenauer; R. Doerner; R. Lehmer; L. Schmitz; C. C. Klepper; M. Menon; B. Leikind; S. Lippmann; M. A. Mahdavi; M. Schaffer; J. Smith; J. Salmonson; J. Watkins

1990-01-01T23:59:59.000Z

340

Plasma diagnostics for the DIII-D divertor upgrade  

SciTech Connect (OSTI)

The DIII-D tokamak is being upgraded to allow for divertor biasing, baffling, and pumping experiments. This paper gives an overview of the new diagnostics added to DIII-D as part of this Advanced Divertor Program. They include tile current monitors, fast reciprocating Langmuir probes, a fixed probe array in the divertor, fast neutral pressure gauges, and H{sub {alpha}} measurements with TV cameras and fiber optics coupled to a high resolution spectrometer. 9 refs.

Hill, D.N.; Futch, A. (Lawrence Livermore National Lab., CA (USA)); Buchenauer, D. (Sandia National Labs., Livermore, CA (USA)); Doerner, R.; Lehmer, R.; Schmitz, L. (California Univ., Los Angeles, CA (USA)); Klepper, C.C.; Menon, M. (Oak Ridge National Lab., TN (USA)); Leikind, B.; Lippmann, S.; Mahdavi, M.A.; Schaffer, M.; Smith, J. (General Atomics, San Diego, CA (USA)); Salmonson, J.; Watkins, J. (San

1990-10-01T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Plasma diagnostics for the DIII-D divertor upgrade  

SciTech Connect (OSTI)

The DIII-D tokamak is being upgraded to allow for divertor biasing, baffling, and pumping experiments. This paper gives an overview of the new diagnostics added to DIII-D as part of this advanced divertor program. They include tile current monitors, fast reciprocating Langmuir probes, a fixed probe array in the divertor, fast neutral pressure gauges, and H{sub {alpha}} measurements with TV cameras and fiber optics coupled to a high-resolution spectrometer.

Hill, D.N.; Futch, A. (Lawrence Livermore National Laboratory, Livermore, CA (USA)); Buchenauer, D. (Sandia National Laboratory, Livermore, CA (USA)); Doerner, R.; Lehmer, R.; Schmitz, L. (University of California, Los Angeles, CA (USA)); Klepper, C.C.; Menon, M. (Oak Ridge National Laboratory, Oak Ridge, TN (USA)); Leikind, B.; Lippmann, S.; Mahdavi, M.A.; Schaffer, M.; Smith, J. (General Atomics, San Diego, CA (USA)); Salmonson, J.; Watkins, J. (Sandia National Laboratory, Albuquerque, NM (USA))

1990-11-01T23:59:59.000Z

342

Plasma diagnostics for the DIII-D divertor upgrade (abstract)  

SciTech Connect (OSTI)

The DIII-D tokamak is being upgraded to allow for divertor biasing, baffling, and pumping experiments. This paper gives an overview of the new diagnostics added to DIII-D as part of this advanced divertor program. They include tile current monitors, fast reciprocating Langmuir probes, a fixed probe array in the divertor, fast neutral pressure gauges, and H{sub {alpha}} measurements with TV cameras and fiber optics coupled to a high-resolution spectrometer.

Hill, D.N.; Futch, A. (Lawrence Livermore National Laboratory, Livermore, CA (USA)); Buchenauer, D. (Sandia National Laboratory, Livermore, CA (USA)); Doerner, R.; Lehmer, R.; Schmitz, L. (University of California, Los Angeles, CA (USA)); Klepper, C.C.; Menon, M. (Oak Ridge National Laboratory, Oak Ridge, TN (USA)); Leikind, B.; Lippmann, S.; Mahdavi, M.A.; Schaffer, M.; Smith, J. (General Atomics, San Diego, CA (USA)); Salmonson, J.; Watkins, J. (Sandia National Laboratory, Albuquerque, NM (USA))

1990-10-01T23:59:59.000Z

343

Providing protection: Agencies receive funding to repair, upgrade dams  

E-Print Network [OSTI]

Story by Kathy Wythe tx H2O | pg. 26 Providing protection Agencies receive funding to repair, upgrade dams along with local partners, can apply for grant funds, he said. Construction of the dams began through four federal authorizations... totaling about $11 million. Of the 343 dams currently classified as high hazard, Scattered across Texas are almost 2,000 nondescript, earthen dams built on private land to protect property, roads, and bridges from flood damages. Some of these dams...

Wythe, Kathy

2009-01-01T23:59:59.000Z

344

High temperature ceramic membrane reactors for coal liquid upgrading  

SciTech Connect (OSTI)

Membrane reactors are today finding extensive applications for gas and vapor phase catalytic reactions (see discussion in the introduction and recent reviews by Armor [92], Hsieh [93] and Tsotsis et al. [941]). There have not been any published reports, however, of their use in high pressure and temperature liquid-phase applications. The idea to apply membrane reactor technology to coal liquid upgrading has resulted from a series of experimental investigations by our group of petroleum and coal asphaltene transport through model membranes. Coal liquids contain polycyclic aromatic compounds, which not only present potential difficulties in upgrading, storage and coprocessing, but are also bioactive. Direct coal liquefaction is perceived today as a two-stage process, which involves a first stage of thermal (or catalytic) dissolution of coal, followed by a second stage, in which the resulting products of the first stage are catalytically upgraded. Even in the presence of hydrogen, the oil products of the second stage are thought to equilibrate with the heavier (asphaltenic and preasphaltenic) components found in the feedstream. The possibility exists for this smaller molecular fraction to recondense with the unreacted heavy components and form even heavier undesirable components like char and coke. One way to diminish these regressive reactions is to selectively remove these smaller molecular weight fractions once they are formed and prior to recondensation. This can, at least in principle, be accomplished through the use of high temperature membrane reactors, using ceramic membranes which are permselective for the desired products of the coal liquid upgrading process. An additional incentive to do so is in order to eliminate the further hydrogenation and hydrocracking of liquid products to undesirable light gases.

Tsotsis, T.T. (University of Southern California, Los Angeles, CA (United States). Dept. of Chemical Engineering); Liu, P.K.T. (Aluminum Co. of America, Pittsburgh, PA (United States)); Webster, I.A. (Unocal Corp., Los Angeles, CA (United States))

1992-01-01T23:59:59.000Z

345

High temperature ceramic membrane reactors for coal liquid upgrading  

SciTech Connect (OSTI)

In this project we will study a novel process concept, i.e., the use of ceramic membrane reactors in upgrading of coal model compounds and coal derived liquids. In general terms, the USC research team is responsible for constructing and operating the membrane reactor apparatus and for testing various inorganic membranes for the upgrading of coal derived asphaltenes and coal model compounds. The USC effort will involve the principal investigator of this project and two graduate research assistants. The ALCOA team is responsible for the preparation of the inorganic membranes, for construction and testing of the ceramic membrane modules, and for measurement of their transport properties. The ALCOA research effort will involve Dr. Paul K. T. Liu, who is the project manager of the ALCOA research team, an engineer and a technician. UNOCAL's contribution will be limited to overall technical assistance in catalyst preparation and the operation of the laboratory upgrading membrane reactor and for analytical back-up and expertise in oil analysis and materials characterization. UNOCAL is a no-cost contractor but will be involved in all aspects of the project, as deemed appropriate.

Tsotsis, T.T.

1992-01-01T23:59:59.000Z

346

UPGRADING METHANE USING ULTRA-FAST THERMAL SWING ADSORPTION  

SciTech Connect (OSTI)

The purpose of this project is to design and demonstrate an approach to upgrade low-BTU methane streams from coal mines to pipeline-quality natural gas. The objective of Phase I of the project was to assess the feasibility of upgrading low-Btu methane streams using ultra-fast thermal swing adsorption (TSA) using Velocys' modular microchannel process technology. The project is on schedule and under budget. For Task 1.1, the open literature, patent information, and vendor contacts were surveyed to identify adsorbent candidates for experimental validation and subsequent demonstration in an MPT-based ultra-fast TSA separation for methane upgrading. The leading candidates for preferential adsorption of methane over nitrogen are highly microporous carbons. A Molecular Gate{trademark} zeolite from Engelhard Corporation has emerged as a candidate. For Task 1.2, experimental evaluation of adsorbents was initiated, and data were collected on carbon (MGN-101) from PICA, Inc. This carbon demonstrated a preferential capacity for methane over nitrogen, as well as a reasonable thermal swing differential capacity for a 90% methane and 10% nitrogen mixture. A similar methane swing capacity at 2 psig was measured. The mixture composition is relevant because gob gas contains nearly 85% methane and must be purified to 97% methane for pipeline quality.

Anna Lee Tonkovich

2004-01-01T23:59:59.000Z

347

Microsoft Word - CX-McNary-Ross_UPGRADE_CIVIL_1_PPA_1876_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

1 1 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Theresa Berry Civil Engineer - TEP-TPP-3 Proposed Action: McNary-Ross No. 1 Upgrade Project, Surface Impairment Removal PP&A Project No.: 1876 Categorical Exclusions Applied (from Subpart D, 10 C.F.R. Part 1021): B1.3, Routine maintenance activities...for structures, rights-of-way, infrastructures such as roads, equipment... routine maintenance activities, corrective....are required to maintain...infrastructures...in a condition suitable for a facility to be used for its designated purpose. Location: Project activities would take place at five locations, identified in the table below: Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to address five surface impairments that were

348

Reaction Mechanisms in Petroleum: From Experimentation to Upgrading and Geological Conditions  

E-Print Network [OSTI]

Among the numerous questions that arise concerning the exploitation of petroleum from unconventional reservoirs, lie the questions of the composition of hydrocarbons present in deep seated HP-HT reservoirs or produced during in-situ upgrading steps of heavy oils and oil shales. Our research shows that experimental hydrocarbon cracking results obtained in the laboratory cannot be extrapolated to geological reservoir conditions in a simple manner. Our demonstration is based on two examples: 1) the role of the hydrocarbon mixture composition on reaction kinetics (the "mixing effect") and the effects of pressure (both in relationship to temperature and time). The extrapolation of experimental data to geological conditions requires investigation of the free-radical reaction mechanisms through a computed kinetic model. We propose a model that takes into account 52 reactants as of today, and which can be continuously improved by addition of new reactants as research proceeds. This model is complete and detailed enou...

Lannuzel, Frédéric; Bounaceur, Roda; Marquaire, Paul-Marie; Michels, Raymond

2009-01-01T23:59:59.000Z

349

Safety at a glance; Upgrading the displays in a nuclear plant control room  

SciTech Connect (OSTI)

As part of an effort to upgrade aging plants, computer-integrated data-acquisition systems are beginning to penetrate the nation's nuclear power control rooms. The impetus is also partly due to the legacy of Three Mile Island, where control room operators, confused about which stream pressure line reading was correct, unfortunately believed the wrong one. This paper reports on the Vermont Yankee nuclear generating facility near Brattleboro, Vt., where the new SPDS requirement provided the opportunity to reassess the existing automated data-acquisition system, an installation that came as original equipment when the plant opened in 1972. The system, a Honeywell industrial computer repackaged by General Electric (which built the reactor), has become obsolete.

Baer, T.

1992-01-01T23:59:59.000Z

350

Developing Enzyme and Biomimetic Catalysts for Upgrading Heavy Crudes via Biological Hydrogenation and Hydrodesulfurization  

SciTech Connect (OSTI)

The recovery and conversion of heavy oils is limited due to the high viscosity of these crudes and their high heteroatom content. Conventional technology relies on thermochemical hydrogenation and hydrodesulfurization to address these problems and is energy intensive due to the high operating temperature and pressure. This project was initiated to explore biological catalysts for adding hydrogen to the heavy oil molecules. Biological enzymes are efficient at hydrogen splitting at very mild conditions such as room temperature and pressure, however, they are very specific in terms of the substrates they hydrogenate. The goal of the project was to investigate how the specificity of these enzymes can be altered to develop catalysts for oil upgrading. Three approaches were used. First was to perform chemical modification of the enzyme surface to improve binding of other non-natural substrates. Second approach was to expose the deeply buried catalytic active site of the enzyme by removal of protein scaffolding to enable better interaction with other substrates. The third approach was based on molecular biology to develop genetically engineered systems for enabling targeted structural changes in the enzyme. The first approach was found to be limited in success due to the non-specificity of the chemical modification and inability to target the region near the active site or the site of substrate binding. The second approach produced a smaller catalyst capable of catalyzing hydrogen splitting, however, further experimentation is needed to address reproducibility and stability issues. The third approach which targeted cloning of hydrogenase in alternate hosts demonstrated progress, although further work is necessary to complete the cloning process. The complex nature of the hydrogenase enzyme structure-function relationship and role of various ligands in the protein require significant more research to better understand the enzyme and to enable success in strategies in developing catalysts with broader specificity as that required for crude upgrading.

Borole, A.P.

2006-08-22T23:59:59.000Z

351

Autonomic behaviour of opportunistic network routing  

Science Journals Connector (OSTI)

In opportunistic networks, end-to-end communication among users does not require a continuous end-to-end path between source and destination. Network protocols are designed to be extremely resilient to events such as long partitions, ... Keywords: autonomic communication, context-aware routing, delay-tolerant networks, mobile networks, opportunistic networks, self-organising networks

Chiara Boldrini; Marco Conti; Andrea Passarella

2008-07-01T23:59:59.000Z

352

NIST Releases Test Framework for Upgrading of Smart Meters | Department of  

Broader source: Energy.gov (indexed) [DOE]

NIST Releases Test Framework for Upgrading of Smart Meters NIST Releases Test Framework for Upgrading of Smart Meters NIST Releases Test Framework for Upgrading of Smart Meters July 12, 2012 - 10:46am Addthis The National Institute of Standards and Technology (NIST) has released a draft set of guidelines that will help utilities test their procedures for upgrading their smart meters securely from a remote location and determine whether their procedures conform with the National Electrical Manufacturers Association (NEMA) Standard for Smart Grid Upgradeability. Available now for public comment, the Advanced Metering Infrastructure Smart Meter Upgradeability Test Framework includes test procedures and detailed steps for conducting the test, reviewing results, and producing records to assess and report on these results.

353

What's Working in Residential Energy Efficiency Upgrade Programs Workshop, May 2011  

Broader source: Energy.gov [DOE]

On May 20, 2011, the Better Buildings Neighborhood Program held the What's Working in Residential Energy Efficiency Upgrade Programs workshop. Better Buildings hosted the workshop in collaboration...

354

Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment  

Broader source: Energy.gov [DOE]

This presentation, given through the DOE's Technical Assitance Program (TAP), provides information on Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment.

355

Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment  

Broader source: Energy.gov [DOE]

The Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment resource guide lists the various federal financing programs for which energy efficiency and clean...

356

Upgrading of heavy oil from the San Joaquin valley of California by aqueous pyrolysis  

SciTech Connect (OSTI)

Midway Sunset crude oil and well-head oil were treated at elevated temperatures in a closed system with the presence of water. Mild to moderate upgrading, as measured by increasing in API gravity, was observed at 400 C or above. Reduced pressure operation exhibited upgrading activity comparable to upgrading under normal aqueous pyrolysis conditions. Reduced pressure operation was obtained by the use of specific blending methods, a surfactant, and the proper amount of water. The use of metal complexes provided additional upgrading. The best of the minimum set tested was Co(II) 2-ethylhexanoate. Fe, Zn, Mo, Cu, and Ni complexes also showed some levels of activity.

Reynolds, J.G.; Murray, A.M.; Nuxoll, E.V.; Fox, G.A.; Thorsness, C.B. [Lawrence Livermore National Lab., CA (United States); Khan, M.R. [Texaco R and D, Beacon, NY (United States)

1997-08-01T23:59:59.000Z

357

Microsoft Word - CX-WallaWalla-Pendleton-Upgrade_FY14_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

3 REPLY TO ATTN OF: KEPRPasco SUBJECT: Environmental Clearance Memorandum Greg Wilfong Lineman Foreman III - TFPF-PASCO Proposed Action: Line upgrade on Bonneville Power...

358

Upgrade and Certification of the Los Alamos National Laboratory SHENC 2011 - 12270  

SciTech Connect (OSTI)

Nondestructive assay measurements of Transuranic (TRU) waste at Los Alamos National Laboratory (LANL) required the addition of a standard waste box (SWB) assay system. A Super High Efficiency Neutron Counter (SHENC) located at Hanford was identified to be relocated to LANL. After careful evaluation of waste streams at LANL, it was determined that the current configuration of the SHENC was not sufficient to quantify certain waste streams. At LANL, there is still a large amount of waste that needs to be retrieved and repackaged within SWB's to meet agreements with the State of New Mexico. Prior to relocating the SHENC, the only assay systems available were High Efficiency Neutron Counters having only a 55-gallon drum capacity. Further analyses indicated that the SHENC system should be capable of quantitative gamma measurements that are to be linked, and combined, with the neutron measurements. The SHENC system was therefore augmented with a new high-resolution gamma spectroscopy system using BE5030 detectors and upgraded gamma electronics. The neutron side of the system was also upgraded with an advanced shift register (JSR-15), an improved Programmable Logic Controller and NDA-2000 software. This report will include calibration of both the neutron and gamma modalities of the SHENC system and how the modality results are combined to produce a single assay result. Preliminary performance results will be discussed based on both mock and real waste measurements. Discussions will also include a complete description of the adjustable parameters as well as the calibration plan, techniques and validations including calibration confirmation based on the Waste Isolation Pilot Plant Waste Acceptance Criteria (WIPP-WAC). The SHENC was successfully upgraded to efficiently measure the complex waste streams at Los Alamos National Laboratory. A new PLC was successfully added to the system for Add-A-Source control. A new shift register was added to the SHENC (JSR-15) which provides more flexibility if replacement is required. The addition of the density based calibration on the gamma modality of the system increases the effectiveness of the SHENC for high alpha-n producing waste. Upgrading the system to new software also helped to standardize the program at Los Alamos. Only one new procedure was initiated for the integration of the SHENC. Add-A-Source measurements were effectively integrated with the system based on the confirmation results and positive results during two Department of Energy Performance Demonstration Program Box Cycles. Total measurement uncertainty estimates were completed for both the gamma modality and the neutron modality of the system. The SHENC was reviewed by both the Department of Energy and the Environmental Protection Agency in 2011. The certification letter for the SHENC was issued on November 16, 2011. With the certification letter issued to the Central Characterization Project the SHENC can perform waste measurements on SWB's at Los Alamos for shipment to WIPP. (authors)

Stanfield, S.B.; Villani, M.; Barton, P.T.; Gerlock, C.; Nakazawa, D.; Baumann, R.C.; Mowry, R. [Canberra Industries, Business Unit Nuclear Measurements of AREVA (BUMN), 800 Research Parkway, Meriden, CT 06450 (United States); Harvill, J.P. [Washington TRU Solutions, LLC2 Carlsbad, NM 88220 (United States)

2012-07-01T23:59:59.000Z

359

Performance of the upgraded LBNL AECR ion source  

SciTech Connect (OSTI)

The LBNL AECR ion source has been upgraded in July 1996 by increasing its magnetic fields to improve its plasma confinement and thereby enhance the source performance. After a few months of tailoring the magnetic field configuration to match the two-frequency plasma heating (14 and 10 GHz), the upgraded AECR ion source (AECR-U) with its higher magnetic fields and higher magnetic mirror ratios has demonstrated significantly enhanced performance. For heavy ions at intensity of about 1 e{mu}A, the charge state was shifted from 42+ to 48+ for uranium and from 41+ to 46+ for bismuth. An order of magnitude enhancement for fully stripped argon ions (I {ge} 60 enA) also has been achieved. Hydrogen-like krypton ions at intensity of about 10{sup 5} pps were extracted from the source and confirmed by measuring its characteristic x-ray with a SiLi crystal detector. High charge state heavy ion beams of xenon-136 and uranium-238 produced with the AECR-U ion source were accelerated by the 88-Inch Cyclotron. Despite poor transmission for the highly charged heavy ions due to vacuum losses in the cyclotron, 11 MeV/nucleon {sup 136}Xe{sup 41+} at 1 x 10{sup 7} pps, 13 MeV/nucleon {sup 136}Xe{sup 46+} at a few hundred pps, and 7 MeV/nucleon {sup 238}U{sup 55+} at 3 x 10{sup 4} pps and 8 MeV/nucleon {sup 238}U{sup 60+} at a few pps were confirmed with a crystal energy detector after extraction from the cyclotron. The total energy of 1.935 GeV of the extracted {sup 238}U{sup 60+} ions is the highest energy ever produced by the 88-Inch Cyclotron. Detailed optimization of the AECR Upgrade will be presented in this paper.

Xie, Z.Q.; Lyneis, C.M.

1997-02-01T23:59:59.000Z

360

Energy Efficiency Upgrades for Little Rock Air Force Base  

SciTech Connect (OSTI)

Little Rock Air Force Base (LRAFB), in partnership with the local utility, Entergy Services, Inc., has reduced energy costs and used savings from investments in high-efficiency equipment to maintain and improve the condition of base housing and other facilities. Three projects were completed, with over $10 million invested. Major accomplishments include replacing air-to-air heat pumps with high-efficiency ground-source heat pumps (GSHPs) in more than 1,500 base housing units, lighting modifications to 10 buildings, upgrade of HVAC equipment in the base's enlisted club, and energy-efficient lighting retrofits for LRAFB's flight simulator.

Goldman, C.; Dunlap, M.A.

2000-11-13T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Optimal control of investments for quality of supply improvement in electrical energy distribution networks  

Science Journals Connector (OSTI)

This paper considers the problem of deciding multi-period investments for maintenance and upgrade of electrical energy distribution networks. After describing the network as a constrained hybrid dynamical system, optimal control theory is applied to ... Keywords: Hybrid systems, Investment planning, Mixed-integer programming, Optimal control, Stochastic systems

A. Bemporad; D. Muñoz de la Peña; P. Piazzesi

2006-08-01T23:59:59.000Z

362

Design and Validation of Control Room Upgrades Using a Research Simulator Facility  

SciTech Connect (OSTI)

Since 1981, the United States (U.S.) Nuclear Regulatory Commission (NRC) [1] requires a plant- specific simulator facility for use in training at U.S. nuclear power plants (NPPs). These training simulators are in near constant use for training and qualification of licensed NPP operators. In the early 1980s, the Halden Man-Machine Laboratory (HAMMLab) at the Halden Reactor Project (HRP) in Norway first built perhaps the most well known set of research simulators. The HRP offered a high- fidelity simulator facility in which the simulator is functionally linked to a specific plant but in which the human-machine interface (HMI) may differ from that found in the plant. As such, HAMMLab incorporated more advanced digital instrumentation and controls (I&C) than the plant, thereby giving it considerable interface flexibility that researchers took full advantage of when designing and validating different ways to upgrade NPP control rooms. Several U.S. partners—the U.S. NRC, the Electrical Power Research Institute (EPRI), Sandia National Laboratories, and Idaho National Laboratory (INL) – as well as international members of the HRP, have been working with HRP to run control room simulator studies. These studies, which use crews from Scandinavian plants, are used to determine crew behavior in a variety of normal and off-normal plant operations. The findings have ultimately been used to guide safety considerations at plants and to inform advanced HMI design—both for the regulator and in industry. Given the desire to use U.S. crews of licensed operators on a simulator of a U.S. NPP, there is a clear need for a research simulator facility in the U.S. There is no general-purpose reconfigurable research oriented control room simulator facility in the U.S. that can be used for a variety of studies, including the design and validation of control room upgrades.

Ronald L. Boring; Vivek Agarwal; Jeffrey C. Joe; Julius J. Persensky

2012-11-01T23:59:59.000Z

363

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

Chapter 6.1 (July 2011) Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the

364

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

----------------------------------------------- ---------------------------------------- Chapter 6.1 (February 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must

365

Algorithms and Hardware for Implementing Artificial Neural Networks Nathan Hower  

E-Print Network [OSTI]

Algorithms and Hardware for Implementing Artificial Neural Networks Nathan Hower Abstract Complex problems require sophisticated processing techniques. Artificial neural networks are based require a parallel processing approach to be computed at practical speeds. Artificial neural networks

366

RF Power Upgrade for CEBAF at Jefferson Laboratory  

SciTech Connect (OSTI)

Jefferson Laboratory (JLab) is currently upgrading the 6GeV Continuous Electron Beam Accelerator Facility (CEBAF) to 12GeV. As part of the upgrade, RF systems will be added, bringing the total from 340 to 420. Existing RF systems can provide up to 6.5 kW of CW RF at 1497 MHZ. The 80 new systems will provide increased RF power of up to 13 kW CW each. Built around a newly designed and higher efficiency 13 kW klystron developed for JLab by L-3 Communications, each new RF chain is a completely revamped system using hardware different than our present installations. This paper will discuss the main components of the new systems including the 13 kW klystron, waveguide isolator, and HV power supply using switch-mode technology. Methodology for selection of the various components and results of initial testing will also be addressed. Notice: Authored by Jefferson Science Associates, LLC under U.S. DOE Contract No. DE-AC05-06OR23177. The U.S. Government retains a non-exclusive, paid-up, irrevocable, world-wide license to publish or reproduce this manuscript for U.S. Government purposes.

Andrew Kimber,Richard Nelson

2011-03-01T23:59:59.000Z

367

Post Retort, Pre Hydro-treat Upgrading of Shale Oil  

SciTech Connect (OSTI)

Various oil feedstocks, including oil from oil shale, bitumen from tar sands, heavy oil, and refin- ery streams were reacted with the alkali metals lithium or sodium in the presence of hydrogen or methane at elevated temperature and pressure in a reactor. The products were liquids with sub- stantially reduced metals, sulfur and nitrogen content. The API gravity typically increased. Sodi- um was found to be more effective than lithium in effectiveness. The solids formed when sodium was utilized contained sodium sulfide which could be regenerated electrochemically back to so- dium and a sulfur product using a "Nasicon", sodium ion conducting membrane. In addition, the process was found to be effective reducing total acid number (TAN) to zero, dramatically reduc- ing the asphaltene content and vacuum residual fraction in the product liquid. The process has promise as a means of eliminating sulfur oxide and carbon monoxide emissions. The process al- so opens the possibility of eliminating the coking process from upgrading schemes and upgrad- ing without using hydrogen.

Gordon, John

2012-09-30T23:59:59.000Z

368

12 GeV Upgrade Project - Cryomodule Production  

SciTech Connect (OSTI)

The Thomas Jefferson National Accelerator Facility (Jefferson Lab) is producing ten 100+MV SRF cryomodules (C100) as part of the CEBAF 12 GeV Upgrade Project. Once installed, these cryomodules will become part of an integrated accelerator system upgrade that will result in doubling the energy of the CEBAF machine from 6 to 12 GeV. This paper will present a complete overview of the C100 cryomodule production process. The C100 cryomodule was designed to have the major components procured from private industry and assembled together at Jefferson Lab. In addition to measuring the integrated component performance, the performance of the individual components is verified prior to being released for production and assembly into a cryomodule. Following a comprehensive cold acceptance test of all subsystems, the completed C100 cryomodules are installed and commissioned in the CEBAF machine in preparation of accelerator operations. This overview of the cryomodule production process will include all principal performance measurements, acceptance criterion and up to date status of current activities.

J. Hogan, A. Burrill, G.K. Davis, M.A. Drury, M. Wiseman

2012-07-01T23:59:59.000Z

369

Fast wave heating in the NSTX-Upgrade device  

SciTech Connect (OSTI)

NSTX-Upgrade will operate with toroidal magnetic fields (B T) up to 1 T, nearly twice the value used in the experiments on NSTX, and the available NBI power will be doubled. The doubling of B T while retaining the 30 MHz RF source frequency has moved the heating regime from the high harmonic fast wave (HHFW) regime used in NSTX to the mid harmonic fast wave (MHFW) regime. By making use of the full wave code AORSA, this work shows that direct ion damping (mainly by thermal ions localized at the 5th harmonic resonance) might be significant in NSTX-Upgrade under TRANSP predicted full performance conditions and the electron and ion absorption is sensitive to the ratio of electron and ion temperature. Launching at high toroidal wave number appears to be one way to significantly reduce the ion damping. By using the extended AORSA code, which includes a detailed description of the scrape-off layer in the field solutions, we found a large electric field amplitude outside of the last closed flux surface as previously seen in NSTX from AORSA simulations (D. L. Green, et al, Phys. Rev. Lett. 107, 145001 (2011)). Preliminary results by introducing a collision damping in the scrape-off layer in the AORSA code to represent a damping process are presented, showing for the first time absorbed power in the scrape-off layer.

Bertelli, Nicola [Princeton Plasma Physics Laboratory (PPPL); Jaeger, E. F. [XCEL; Berry, Lee Alan [XCEL Engineering Inc., Oak Ridge; Bonoli, P. [Massachusetts Institute of Technology (MIT); Budny, R. V. [Princeton Plasma Physics Laboratory (PPPL); Fu, GuoYong [Princeton Plasma Physics Laboratory (PPPL); Gerhardt, S. [Princeton Plasma Physics Laboratory (PPPL); Green, David L [ORNL; Harvey, R. W. [CompX, Del Mar, CA; Hosea, J. [Princeton Plasma Physics Laboratory (PPPL); Kramer, G. [Princeton Plasma Physics Laboratory (PPPL); LeBlanc, B [Princeton Plasma Physics Laboratory (PPPL); Perkins, R. J. [Princeton Plasma Physics Laboratory (PPPL); Phillips, C. K. [Princeton Plasma Physics Laboratory (PPPL); Ryan, Philip Michael [ORNL; Taylor, G. [Princeton Plasma Physics Laboratory (PPPL); Valeo, E. J. [Princeton Plasma Physics Laboratory (PPPL); Wilson, J. R. [Princeton Plasma Physics Laboratory (PPPL); Wright, J. [Massachusetts Institute of Technology (MIT)

2013-01-01T23:59:59.000Z

370

THERMAL UPGRADING OF 9977 RADIOACTIVE MATERIAL (RAM) TYPE B PACKAGE  

SciTech Connect (OSTI)

The 9977 package is a radioactive material package that was originally certified to ship Heat Sources and RTG contents up to 19 watts and it is now being reviewed to significantly expand its contents in support of additional DOE missions. Thermal upgrading will be accomplished by employing stacked 3013 containers, a 3013 aluminum spacer and an external aluminum sleeve for enhanced heat transfer. The 7th Addendum to the original 9977 package Safety Basis Report describing these modifications is under review for the DOE certification. The analyses described in this paper show that this well-designed and conservatively analyzed package can be upgraded to carry contents with decay heat up to 38 watts with some simple design modifications. The Model 9977 package has been designed as a replacement for the Department of Transportation (DOT) Fissile Specification 6M package. The 9977 package is a very versatile Type B package which is certified to transport and store a wide spectrum of radioactive materials. The package was analyzed quite conservatively to increase its usefulness and store different payload configurations. Its versatility is evident from several daughter packages such as the 9978 and H1700, and several addendums where the payloads have been modified to suit the Shipper's needs without additional testing.

Gupta, N.; Abramczyk, G.

2012-03-26T23:59:59.000Z

371

Steady State Heat Deposits Modeling in the Nb3Sn Quadrupole Magnets for the Upgrade of the LHC Inner Triplet  

SciTech Connect (OSTI)

In hadron colliders such as the LHC, the energy deposited in the superconductors by the particles lost from the beams or coming from the collision debris may provoke quenches detrimental to the accelerator operation. In previous papers, a Network Model has been used to study the thermodynamic behavior of magnet coils and to calculate the quench levels in the LHC magnets for expected beam loss profiles. This model was subsequently used for thermal analysis and design optimization of Nb{sub 3}Sn quadrupole magnets, which LARP (US LHC Accelerator Research Program) is developing for possible use in the LHC luminosity upgrade. For these new magnets, the heat transport efficiency from the coil to the helium bath needs to be determined and optimized. In this paper the study of helium cooling channels and the heat evacuation scheme are presented and discussed.

Bocian, D.; Ambrosio, G.; Felice, H.; Barzi, E.; Bossert, R.; Caspi, S.; Chlachidze, G.; Dietderich, D.; Feher, S.; Ferracin, P.; Hafalia, R.; /Fermilab /Lawrence Berkeley Lab /Brookhaven

2011-09-01T23:59:59.000Z

372

Modeling energy consumption in cellular networks L. Decreusefond  

E-Print Network [OSTI]

, the mobile industry continues to look for ways to reduce energy needs. Air conditioning is being replaced by fans or passive air flows whenever possible. Several programs are aiming to deploy solar, wind countries by 2012. Network optimization upgrades currently can reduce energy consumption by 44% and solar

Boyer, Edmond

373

Application of Carbon Nanocatalysts in Upgrading Heavy Crude Oil Assisted with Microwave Heating  

E-Print Network [OSTI]

Application of Carbon Nanocatalysts in Upgrading Heavy Crude Oil Assisted with Microwave Heating, Stanford, California 94305, United States *S Supporting Information ABSTRACT: Heavy crude oil can that by using carbon nano- catalysts, heavy crude oil can be efficiently upgraded to lighter oil at a relatively

Cui, Yi

374

Upgrading and enhanced recovery of Jobo heavy oil using hydrogen donor under in-situ combustion  

E-Print Network [OSTI]

In-situ upgrading of oil using hydrogen donors is a new process. In particular, very little research has been conducted with respect to in-situ oil upgrading using hydrogen donor under in-situ combustion. Several papers describe the use of metal...

Huseynzade, Samir

2009-05-15T23:59:59.000Z

375

Status of the Tandem Mirror Experiment-Upgrade (TMX-U) diagnostic system  

SciTech Connect (OSTI)

This paper presents the current status of the Tandem Mirror Experiment-Upgrade (TMX-U) diagnostics system. For the initial instruments active on TMX-U, the expansions or upgrades that have been implemented are outlined. For the newly added systems, more implementation details are presented.

Coutts, G.W.; Coffield, F.E.; Hornady, R.S.

1983-11-26T23:59:59.000Z

376

Effect of Upgraded Lignite Product Water Content on the Propensity for Spontaneous Ignition  

Science Journals Connector (OSTI)

At the end of 2005, worldwide lignite reserves were 207.4 billion tons and accounted for 17.7% of total coal. ... Therefore, there is still considerable interest in the propensity for spontaneous ignition of upgraded lignites products with different moisture contents and also the recommended water content for upgraded lignite products. ...

Kai Zhang; Changfu You

2012-12-11T23:59:59.000Z

377

PHOTOINJECTED ENERGY RECOVERY LINAC UPGRADE FOR THE NATIONAL SYNCHROTRON LIGHT SOURCE *  

E-Print Network [OSTI]

PHOTOINJECTED ENERGY RECOVERY LINAC UPGRADE FOR THE NATIONAL SYNCHROTRON LIGHT SOURCE * Ilan Ben of the National Synchrotron Light Source (NSLS). This upgrade will be based on the Photoinjected Energy Recovering limitations. First, the emittance of a storage ring based light source is proportional to the energy

Brookhaven National Laboratory

378

A new high-gradient correction quadrupole for the Fermilab luminosity upgrade  

SciTech Connect (OSTI)

Special superconducting correction quadrupoles are needed for the luminosity upgrade of the Fermilab Tevatron Collider. These correctors are part of the low-beta system for the interaction regions at B/phi/ and D/phi/. The requirements are high gradient and low current. A quadrupole has been designed that meets the operating gradient of 0.63 T/cm at 1086 A. The one-layer quadrupole is wound with a cable consisting of five individually insulated rectangular strands. The five strands are overwrapped with Kapton and epoxy impregnated glass tape. The winding, curing and collaring of the magnet is accomplished in the same manner as Tevatron-like magnets using Rutherford style cable. Once the magnet is complete the five strands are connected in series. A prototype quadrupole has been assembled and tested. The magnet reached a plateau current of 1560 A corresponding to a gradient of 0.91 T/cm without training. The measured field harmonics are substantially better than required. 8 refs., 6 figs., 4 tabs.

Mantsch, P.; Carson, J.; Riddiford, A.; Lamm, M.J.

1989-03-01T23:59:59.000Z

379

EA-1321: Proposed Upgrade and Improvement of The National Synchrotron Light  

Broader source: Energy.gov (indexed) [DOE]

21: Proposed Upgrade and Improvement of The National 21: Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York EA-1321: Proposed Upgrade and Improvement of The National Synchrotron Light Source Complex at Brookhaven National Laboratory, Upton, New York SUMMARY This EA evaluates the environmental impacts for the proposal to upgrade the facilities of the U.S. Department of Energy's National Synchrotron Light Source Complex, namely the National Synchrotron Light Source, the Accelerator Test Facility and the Source Development Laboratory. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD December 12, 2001 EA-1321: Finding of No Significant Impact Proposed Upgrade and Improvement of The National Synchrotron Light Source

380

Rebates Cut the Price of Big-Time Efficiency Upgrades | Department of  

Broader source: Energy.gov (indexed) [DOE]

Rebates Cut the Price of Big-Time Efficiency Upgrades Rebates Cut the Price of Big-Time Efficiency Upgrades Rebates Cut the Price of Big-Time Efficiency Upgrades February 22, 2010 - 5:52pm Addthis One of the smartest ways for homeowners to save money on major appliance upgrades is to hook into an energy efficiency rebate program. The Neighborhood Energy Connection (NEC), a non-profit organization in St. Paul, Minnesota, helps local residents take advantage of Xcel Energy's rebate programs that cut the cost of whole-house energy efficiency upgrades. It can start with a visit from the "Home Energy Squad", a program offered jointly by Xcel Energy and CenterPoint Energy, the local energy providers (NEC implements the program for Xcel Energy). The Energy Squad installs simple efficiency-improving products such as compact fluorescent

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Plains & Eastern Clean Line Project Proposal for New or Upgraded  

Broader source: Energy.gov (indexed) [DOE]

Plains & Eastern Clean Line Project Proposal for New or Upgraded Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (July 2010) Update to Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 (August 2011) More Documents & Publications EIS-0486: Notice of Intent and Notice of Potential Floodplain and Wetland Involvement Notice of Intent To Prepare an Environmental Impact Statement for the

382

Cost modeling and evaluation of capital expenditures in optical multilayer networks  

Science Journals Connector (OSTI)

Optical multilayer networks offer a high degree of freedom in network design, adapting to actual network requirements (demand types, topologies, etc.) and achieving cost-efficient...

Huelsermann, Ralf; Gunkel, Matthias; Meusburger, Clara; Schupke, Dominic A

2008-01-01T23:59:59.000Z

383

An overview of high-speed networking for workstations  

SciTech Connect (OSTI)

The telecommunications industry provides new technologies for GIS (Geographic Information System) workstation upgrades: Fast Ethernet, 100VG-AnyLAN, and Asynchronous Transfer Mode (ATM). These network technologies are based on approved standards and have industry backing (alliance for Fast Ethernet). This paper briefly examines these technologies. Fast Ethernet is an extension to its predecessor 10 Mbps Ethernet, providing a 10x increase in transmission rate. 100VG-AnyLAN offers extensions to Ethernet but embraces the Token Ring technology, allowing internetworking and better performance for networked video. ATM takes a radial approach by simplifying the information quantum to a 53-byte cell, resulting in rapid data handling for telecommunications equipment and allowing efficient transport of data, video, and voice communications. Switched Ethernet and Full Duplexing are among the other technologies competing for this market. The ultimate test of usefulness for any technology lies in how they handle the GIS environment requirements; working demonstration systems will help clarify marketing rhetoric and determine which vendor best implemented the standard.

Hake, K.

1995-04-01T23:59:59.000Z

384

Exploration of the Equilibrium Operating Space For NSTX-Upgrade  

SciTech Connect (OSTI)

This paper explores a range of high-performance equilibrium scenarios available in the NSTX-Upgrade device [J.E. Menard, submitted for publication to Nuclear Fusion]. NSTX-Upgrade is a substantial upgrade to the existing NSTX device [M. Ono, et al., Nuclear Fusion 40, 557 (2000)], with significantly higher toroidal field and solenoid capabilities, and three additional neutral beam sources with significantly larger current drive efficiency. Equilibria are computed with freeboundary TRANSP, allowing a self consistent calculation of the non-inductive current drive sources, the plasma equilibrium, and poloidal field coil current, using the realistic device geometry. The thermal profiles are taken from a variety of existing NSTX discharges, and different assumptions for the thermal confinement scalings are utilized. The no-wall and idealwall n=1 stability limits are computed with the DCON code. The central and minimum safety factors are quite sensitive to many parameters: they generally increases with large outer plasmawall gaps and higher density, but can have either trend with the confinement enhancement factor. In scenarios with strong central beam current drive, the inclusion of non-classical fast ion diffusion raises qmin, decreases the pressure peaking, and generally improves the global stability, at the expense of a reduction in the non-inductive current drive fraction; cases with less beam current drive are largely insensitive to additional fast ion diffusion. The non-inductive current level is quite sensitive to the underlying confinement and profile assumptions. For instance, for BT=1.0 T and Pinj=12.6 MW, the non-inductive current level varies from 875 kA with ITER-98y,2 thermal confinement scaling and narrow thermal profiles to 1325 kA for an ST specific scaling expression and broad profiles. This sensitivity should facilitate the determination of the correct scaling of transport with current and field to use for future fully non-inductive ST devices. Scenarios are presented which can be sustained for 8-10 seconds, or (20-30)?CR, at ?N=3.8-4.5, facilitating, for instance, the study of disruption avoidance for very long pulse. Scenarios have been documented which can operate with ?T~25% and equilibrated qmin>1. The value of qmin can be controlled at either fixed non-inductive fraction of 100% or fixed plasma current, by varying which beam sources are used, opening the possibility for feedback qmin control. In terms of quantities like collisionality, neutron emission, non-inductive fraction, or stored energy, these scenarios represent a significant performance extension compared to NSTX and other present spherical torii.

S.P. Gerhardt, R. Andre and J.E. Menard

2012-04-25T23:59:59.000Z

385

Required Documents  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Required Documents Required Documents Required Documents All foreign nationals, including students and postdocs, must select the foreign nationals employment category to complete the new-hire process. Contact (505) 665-7158 Email Complete following forms before New-Hire Orientation Be sure to bring the forms with you for the orientation event, but do not sign and date: Form I-9, Employment Eligibility Verification (pdf) - original, unexpired documents for verification of employment eligibility. Please refer to the I-9 verification form titled, "Lists of Acceptable Documents", which was included with your offer letter. (Laminated documents or hospital/temporary birth certificates are not accepted.) Note: Failure to provide required documents will result in delay and/or

386

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

Chapter 6.1 (April 2009) Chapter 6.1 (April 2009) Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is

387

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

Chapter 6.1 (April 2010) Chapter 6.1 (April 2010) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3. Documentation justifying the use of any of these exceptions is required. The exception, with supporting documentation, must be certified and approved at certain levels that vary according to the dollar value of the acquisition. The information that must be included in each justification is identified in FAR

388

Proposal concerning the participation of CERN in the procurement of depleted-uranium sheets for the UA1 calorimeter upgrading  

E-Print Network [OSTI]

Proposal concerning the participation of CERN in the procurement of depleted-uranium sheets for the UA1 calorimeter upgrading

1985-01-01T23:59:59.000Z

389

Spring 2006 CS 649 1 Sensor Networks  

E-Print Network [OSTI]

requirements vary · Sample-and-collect: can tolerate errors · Scales to large networks? (cf. GDI report [ZG+04

Amir, Yair

390

Microsoft Word - CX-Olympia-SouthElma_upgrades_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

0, 2011 0, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: The project consists of upgrades to the Olympia-South Elma No. 1, 115-kV transmission line from structure 21/10 to Elma Substation. Budget Information: Work Order #251089 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): B4.6 Additions or modifications to electric power transmission facilities that would not effect the environment beyond the previously developed facility area including but not limited to....tower modifications, changing insulators, and replacement of poles ...conductors...and crossarms. Location: The project is located in Grays Harbor County, Washington along Bonneville Power

391

Energy Star Building Upgrade Manual Retrocommissioning Chapter 5  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

5. Retrocommissioning 5. Retrocommissioning Revised October 2007 5. Overview 2 Energy and Non-energy Benefits 3 5.2 Project Planning 5 Selecting a Project 5 Benchmarking 5 Selecting a Provider and Team 6 Developing a Scope of Work 7 5.3 Project Execution 7 Implementing the Recommendations 8 Maintaining the Benefits 9 Planning for Recommissioning 10 5.4 Tune-up Opportunities  Lighting 11 Supplemental Loads 12 Distribution Systems 13 Heating and Cooling Systems 14 5.5 Summary 6 Bibliography 7 Glossary G- ENERGY STAR ® Building Manual 2 5. Retrocommissioning 5. Overview Retrocommissioning is the first stage in the building upgrade process. The staged approach accounts for the interactions among all the energy flows in a building (Figure 5.1) and pro-

392

Switchyards Rebuild and Upgrade Project in Mohave County, Arizona  

Broader source: Energy.gov (indexed) [DOE]

. . Categorical Exclusion for the Demolition of a Service Building at Davis Dam Lower 230-kV Switchyard as part of the Overall Switchyards Rebuild and Upgrade Project in Mohave County, Arizona RECORD OF CATEGORICAL EXCLUSION DETERMINATION A. Proposed Action: Western Area Power Administration (Western) plans to demolish a service building located in the Lower 230-kV Switchyard at Davis Dam, because it no longer meets our needs and we do not anticipate finding a use for it in the future. The building is currently vacant and has been for years. We plan to begin the work on April 1 ,2011 and complete it by December 31,2011. The attached map shows the project area location. Aerial photographs show that much of this area is developed. Western owns the land. The legal description is

393

Boiler Upgrades Save Money & Energy: Boeing Philadelphia  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Boeing Philadelphia Boeing Philadelphia The Boeing Company, headquartered in the U.S., is the world's largest aerospace company and is a leading manufacturer of commercial jetliners and defense, space, and security systems. The company controls over 84 million square feet of facilities enterprise-wide and employs over 159,000. Through its partnership with ENERGY STAR, Boeing has refined its corporate-wide energy management program. As a result, Boeing has been able to strengthen energy management across its sites, including the Philadelphia plant where the company produces the H-47 Chinook Helicopter. Increases in production prompted Boeing to undertake a project to upgrade 223,000 square feet of factory. The planned major retrofit afforded the opportunity to look holistically at energy use at the site, and

394

Microsoft PowerPoint - ATLAS_upgrade_physics_program  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Guy Savard Guy Savard Argonne National Laboratory and University of Chicago Science with the ATLAS Efficiency and Intensity Upgrade ATLAS Users Meeting August 8-9 2009 2 G. Savard 2009 ATLAS S&T Review May 18-19, 2009 Outline Evolving landscape for low-energy nuclear physics Self-assessment of ATLAS present and near future program Process followed to evaluate near and longer term physics program needs and role in community Option proposed - Physics - Machine - Instrumentation 3 G. Savard 2009 ATLAS S&T Review May 18-19, 2009 The new landscape: what is coming to a town near us ---- FRIB ---- At full power - Fast beams - Reaccelerated beams at a few % of that Starts operating ~ 2017-18

395

Microsoft Word - Noxon Radio Station Upgrade CX.doc  

Broader source: Energy.gov (indexed) [DOE]

5, 2011 5, 2011 REPLY TO ATTN OF: KEC-4 SUBJECT: Environmental Clearence Memorandum David Tripp - TEP-CSB-1 Proposed Action: Noxon Radio Station Upgrade Project Budget Information: Work Order # 00254987 Task 03 Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021: B1.7 "Acquisition, installation, operation, and removal of communication systems..." Location: Sanders County, Montana - Section 33, Township 26 North, Range 32 West of the Noxon Rapids Dam Quadrangle Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: BPA proposes to replace the existing building at Noxon Radio Station with a new 650 square foot building. The existing building, especially the floor, is deteriorating

396

NEUTRON RADIOGRAPHY (NRAD) REACTOR 64-ELEMENT CORE UPGRADE  

SciTech Connect (OSTI)

The neutron radiography (NRAD) reactor is a 250 kW TRIGA (registered) (Training, Research, Isotopes, General Atomics) Mark II , tank-type research reactor currently located in the basement, below the main hot cell, of the Hot Fuel Examination Facility (HFEF) at the Idaho National Laboratory (INL). It is equipped with two beam tubes with separate radiography stations for the performance of neutron radiography irradiation on small test components. The interim critical configuration developed during the core upgrade, which contains only 62 fuel elements, has been evaluated as an acceptable benchmark experiment. The final 64-fuel-element operational core configuration of the NRAD LEU TRIGA reactor has also been evaluated as an acceptable benchmark experiment. Calculated eigenvalues differ significantly (approximately +/-1%) from the benchmark eigenvalue and have demonstrated sensitivity to the thermal scattering treatment of hydrogen in the U-Er-Zr-H fuel.

John D. Bess

2014-03-01T23:59:59.000Z

397

PDQ physics analysis for the ATR-FSAR upgrade  

SciTech Connect (OSTI)

The final safety analysis report (FSAR) for the Advanced Test Reactor (ATR) is presently being updated at the Idaho National Engineering Laboratory and will use the US Nuclear Regulatory Commission's FSAR format as a guide to provide a safety analysis comparable with that used throughout the commercial nuclear industry. In upgrading the FSAR, an updated reactor core physics analysis is performed on the unique serpentine core design. Unlike the two-dimensional (2D) partial core model used in the original FSAR, this new physics analysis uses both 2D and Three-dimensional (3D) PDQ full-core models employing the most recent cross-section data libraries. The 2D PDQ benchmark comparison provides a reliable validation for the ATR FSAR power distribution calculations. And the new full-core depletion analysis now provides a more detailed picture of changes in core composition, power distributions, and reactivity as a function of time.

Kim, S.S.; Buescher, B.J. (EG and G Idaho, Inc., Idaho Falls (United States))

1992-01-01T23:59:59.000Z

398

THE SNS VACUUM CONTROL SYSTEM UPGRADE FOR THE SUPERCONDUCTING LINAC  

SciTech Connect (OSTI)

The superconducting linac of the Spallation Neutron Source (SNS) has 23 cryomodules whose vacuum system is monitored and controlled by custom built hardware. The original control hardware was provided by Thomas Jefferson National Accelerator Facility (JLab) and contained a variety of custom boards utilizing integrated circuits to perform logic. The need for control logic changes, a desire to increase maintainability, and a desire to increase flexibility to adapt for the future has led to a Programmable Logic Controller (PLC) based upgrade. This paper provides an overview of the commercial off-the-shelf (COTS) hardware being used in the superconducting vacuum control system. Details of the design and challenges to convert a control system during small windows of maintenance periods without disrupting beam operation will be covered in this paper.

Williams, Derrick C [ORNL] [ORNL

2009-01-01T23:59:59.000Z

399

Spectrally resolved motional Stark effect measurements on ASDEX Upgrade  

SciTech Connect (OSTI)

A spectrally resolved Motional Stark Effect (MSE) diagnostic has been installed at ASDEX Upgrade. The MSE data have been fitted by a forward model providing access to information about the magnetic field in the plasma interior [R. Reimer, A. Dinklage, J. Geiger et al., Contrib. Plasma Phys. 50, 731–735 (2010)]. The forward model for the beam emission spectra comprises also the fast ion D{sub ?} signal [W. W. Heidbrink and G. J. Sadler, Nucl. Fusion 34, 535–615 (1994)] and the smearing on the CCD-chip. The calculated magnetic field data as well as the revealed (dia)magnetic effects are consistent with the results from equilibrium reconstruction solver. Measurements of the direction of the magnetic field are affected by unknown and varying polarization effects in the observation.

Reimer, R.; Dinklage, A.; Wolf, R. [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, Wendelsteinstraße 1, 17491 Greifswald (Germany)] [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Teilinstitut Greifswald, Wendelsteinstraße 1, 17491 Greifswald (Germany); Fischer, R.; Hobirk, J.; Löbhard, T.; Mlynek, A.; Reich, M. [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstraße 2, 85748 Garching (Germany)] [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstraße 2, 85748 Garching (Germany); Sawyer, L. [Department of Physics and Astronomy, University of Sheffield, Sheffield S3 7RH (United Kingdom)] [Department of Physics and Astronomy, University of Sheffield, Sheffield S3 7RH (United Kingdom); Collaboration: ASDEX Upgrade

2013-11-15T23:59:59.000Z

400

Integrated EM & Thermal Simulations with Upgraded VORPAL Software  

SciTech Connect (OSTI)

Nuclear physics accelerators are powered by microwaves which must travel in waveguides between room-temperature sources and the cryogenic accelerator structures. The ohmic heat load from the microwaves is affected by the temperature-dependent surface resistance and in turn affects the cryogenic thermal conduction problem. Integrated EM & thermal analysis of this difficult non-linear problem is now possible with the VORPAL finite-difference time-domain simulation tool. We highlight thermal benchmarking work with a complex HOM feed-through geometry, done in collaboration with researchers at the Thomas Jefferson National Accelerator Laboratory, and discuss upcoming design studies with this emerging tool. This work is part of an effort to generalize the VORPAL framework to include generalized PDE capabilities, for wider multi-physics capabilities in the accelerator, vacuum electronics, plasma processing and fusion R&D fields, and we will also discuss user interface and algorithmic upgrades which facilitate this emerging multiphysics capability.

D.N. Smithe, D. Karipides, P. Stoltz, G. Cheng, H. Wang

2011-03-01T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Nuclear materials control and accountability criteria for upgrades measures  

SciTech Connect (OSTI)

As a result of major political and societal changes in the past several years, methods of nuclear material control may no longer be as effective as in the past in Russia, the Newly Independent States (NIS), and the Baltic States (BS). The objective of the Department of Energy (DOE) Material Protection, Control, and Accounting Program (MPC and A) is to reduce the threat of nuclear proliferation by collaborating with Russia, NIS, and BS governments to promote western-style MPC and A. This cooperation will improve the MPC and A on all weapons useable nuclear materials and will establish a sustainable infrastructure to provide future support and maintenance for these technology-based improvements. Nuclear materials of proliferation concern include materials of the types and quantities that can be most easily and directly used in a nuclear weapon. Sabotage of nuclear material is an event of great concern and potentially disastrous consequences to both the US and the host country. However, sabotage is currently beyond the scope of program direction and cannot be used to justify US-funded MPC and A upgrades. Judicious MPC and A upgrades designed to protect against insider and outsider theft scenarios would also provide addition, although not comprehensive, protection against saboteurs. This paper provides some suggestions to establish consistency in prioritizing system-enhancement efforts at nuclear material facilities. The suggestions in this paper are consistent with DOE policy and directions and should be used as a supplement to any policy directives issued by NN-40, DOE Russia/NIS Task Force.

Erkkila, B.H.; Hatcher, C.R.

1998-11-01T23:59:59.000Z

402

Interconnecting PV on New York City's Secondary Network Distribution System  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) has teamed with cities across the country through the Solar America Cities (SAC) partnership program to help reduce barriers and accelerate implementation of solar energy. The New York City SAC team is a partnership between the City University of New York (CUNY), the New York City Mayor s Office of Long-term Planning and Sustainability, and the New York City Economic Development Corporation (NYCEDC).The New York City SAC team is working with DOE s National Renewable Energy Laboratory (NREL) and Con Edison, the local utility, to develop a roadmap for photovoltaic (PV) installations in the five boroughs. The city set a goal to increase its installed PV capacity from1.1 MW in 2005 to 8.1 MW by 2015 (the maximum allowed in 2005). A key barrier to reaching this goal, however, is the complexity of the interconnection process with the local utility. Unique challenges are associated with connecting distributed PV systems to secondary network distribution systems (simplified to ���¢��������networks���¢������� in this report). Although most areas of the country use simpler radial distribution systems to distribute electricity, larger metropolitan areas like New York City typically use networks to increase reliability in large load centers. Unlike the radial distribution system, where each customer receives power through a single line, a network uses a grid of interconnected lines to deliver power to each customer through several parallel circuits and sources. This redundancy improves reliability, but it also requires more complicated coordination and protection schemes that can be disrupted by energy exported from distributed PV systems. Currently, Con Edison studies each potential PV system in New York City to evaluate the system s impact on the network, but this is time consuming for utility engineers and may delay the customer s project or add cost for larger installations. City leaders would like to streamline this process to facilitate faster, simpler, and less expensive distributed PV system interconnections. To assess ways to improve the interconnection process, NREL conducted a four-part study with support from DOE. The NREL team then compiled the final reports from each study into this report. In Section 1���¢��������PV Deployment Analysis for New York City���¢��������we analyze the technical potential for rooftop PV systems in the city. This analysis evaluates potential PV power production in ten Con Edison networks of various locations and building densities (ranging from high density apartments to lower density single family homes). Next, we compare the potential power production to network loads to determine where and when PV generation is most likely to exceed network load and disrupt network protection schemes. The results of this analysis may assist Con Edison in evaluating future PV interconnection applications and in planning future network protection system upgrades. This analysis may also assist other utilities interconnecting PV systems to networks by defining a method for assessing the technical potential of PV in the network and its impact on network loads. Section 2���¢��������A Briefing for Policy Makers on Connecting PV to a Network Grid���¢��������presents an overview intended for nontechnical stakeholders. This section describes the issues associated with interconnecting PV systems to networks, along with possible solutions. Section 3���¢��������Technical Review of Concerns and Solutions to PV Interconnection in New Y

K. Anderson; M. Coddington; K. Burman; S. Hayter; B. Kroposki; and A. Watson

2009-11-30T23:59:59.000Z

403

Network Maps  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Fasterdata IPv6 Network Network Performance Tools The ESnet Engineering Team Network R&D Overview Experimental Network Testbeds Performance (perfSONAR) Software & Tools...

404

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

--------------------------- Chapter 6.5 (January 2011) 1 Competition Advocate Responsibilities [Reference: FAR 6.5, FAR 7 and DEAR 906.501] Overview This section discusses the competition advocate requirements and provides a Federal Procurement Data System-New Generation (FPDS-NG) coding assistance sheet and screen shots for the FPDS-NG Competition Report. Background FAR Part 6.5, -Competition Advocates,‖ implements section 20 of the Office of Federal Procurement Policy Act, which requires the head of each executive agency to designate an Agency Competition Advocate and Procuring Activity Advocates (hereafter referred to as Activity Competition Advocates). In accordance with DEAR 906.501, the Secretary of

405

MHUG process for production of low sulfur and low aromatic diesel fuel. [Medium-pressure Hydro UpGrading  

SciTech Connect (OSTI)

A new hydro-upgrading process operated under medium pressure has been developed to reduce the sulfur and the aromatics content in light cycle oil (LCO). Two catalysts were used in series in this technology. The commercial RN-1 catalyst, which is known as having high activity in hydrodenitrogenation, desulfurization and aromatic saturation, was chosen as the first catalyst. The second one was a nickel-tungsten zeolite catalyst, named RT-5, which was developed by RIPP specially for hydrogenolysis of naphthenic and aromatic hydrocarbons. The pilot plant tests showed that high quality diesel oil with aromatics content less than 20 v% and sulfur content less than 0.05 wt% could be produced from various LCO/straight-run-gas-oil (SRGO) blended feedstocks under hydrogen partial pressure of 6.4 MPa. The reaction temperature and overall space velocity (S.V.) varied in the range of 350--380 C and 0.6--1.2 h[sup [minus]1], respectively, depending on the properties of the feedstocks to be processed and the upgrading depth required. Several examples presented also illustrated that this technology could be used to prepare catalytic reforming feedstock as well, which is in urgent need in China. A life test operated in relatively high severity for 3,000 hr. indicated that the catalysts possessed excellent stability. A commercial demonstration unit has been running well since the last Oct 1.

Shi, Yu Lin; Shi, Jian Wen; Zhang, Xin Wei; Shi, Ya Hua; Li, Da Dong (SINOPEC, Beijing (China). Research Inst. of Petroleum Processing)

1993-01-01T23:59:59.000Z

406

A Silicon Strip Detector for the Phase II High Luminosity Upgrade of the ATLAS Detector at the Large Hadron Collider  

E-Print Network [OSTI]

This thesis presents the work carried out in the testing of the ATLAS Phase-II Upgrade electronic systems in the future strips tracker after 2023, to be installed for operations in the HL-LHC period. The high luminosity and number of interactions per crossing that will happen after the HL-LHC starts require a complete replacement of the ATLAS tracker. The systems that have been defined for the Phase-II Upgrade will be designed to cope with that increased radiation and have the right granularity to maintain the performance with higher pile-up. In this thesis I present results on single modules and larger structures comprising multiple modules. In the context of the current ATLAS Semiconductor Tracker studies, I present an analysis of the data taken by the detector from the beginning of operation in 2010 until the first Long Shut-down in 2013. The analysis consists of an energy loss study in the Semiconductor Tracker, a task the detector was not designed to perform. However, the availability of the Time-over-Th...

García-Argos, Carlos

2015-01-01T23:59:59.000Z

407

ESnet: Advanced Networking for Science  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Similarly, the experiment facilities at the new Spallation Neu- tron Source and Magnetic Fusion Energy facili- ties will start using the network in ways that require...

408

Microsoft Word - CX-AlveyMaintenanceHQ_PoleStorageUpgrade_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

4 4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Environmental protection system upgrades at pole storage facility at Alvey Maintenance Headquarters. Budget Information: Work Order #00283226 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms.

409

Microsoft Word - CX-HatwaiSubstationUpgradesFY11_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

18, 2011 18, 2011 REPLY TO ATTN OF: KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at Hatwai Substation Budget Information: Work Order: 00004952 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to: switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms.

410

Potential Peak Load Reductions From Residential Energy Efficient Upgrades  

E-Print Network [OSTI]

of the distribution network can be improved; and added environmental pollution can be minimized. Energy efficiency improvements, especially through residential programs, are increasingly being used to mitigate this rise in peak demand. This paper examines...

Meisegeier, D.; Howes, M.; King, D.; Hall, J.

2002-01-01T23:59:59.000Z

411

Competition Requirements  

Broader source: Energy.gov (indexed) [DOE]

- Chapter 5.2 (April 2008) - Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in FAR Part 6. One exception permits contracting without full and open competition when the required supplies or services are available from only one responsible source (FAR 6.302-1). This exception is

412

Novel Fast Pyrolysis/Catalytic Technology for the Production of Stable Upgraded Liquids  

SciTech Connect (OSTI)

The objective of the proposed research is the demonstration and development of a novel biomass pyrolysis technology for the production of a stable bio-oil. The approach is to carry out catalytic hydrodeoxygenation (HDO) and upgrading together with pyrolysis in a single fluidized bed reactor with a unique two-level design that permits the physical separation of the two processes. The hydrogen required for the HDO will be generated in the catalytic section by the water-gas shift reaction employing recycled CO produced from the pyrolysis reaction itself. Thus, the use of a reactive recycle stream is another innovation in this technology. The catalysts will be designed in collaboration with BASF Catalysts LLC (formerly Engelhard Corporation), a leader in the manufacture of attrition-resistant cracking catalysts. The proposed work will include reactor modeling with state-of-the-art computational fluid dynamics in a supercomputer, and advanced kinetic analysis for optimization of bio-oil production. The stability of the bio-oil will be determined by viscosity, oxygen content, and acidity determinations in real and accelerated measurements. A multi-faceted team has been assembled to handle laboratory demonstration studies and computational analysis for optimization and scaleup.

Ted Oyama, Foster Agblevor, Francine Battaglia, Michael Klein

2013-01-18T23:59:59.000Z

413

Darlington tritium removal facility and station upgrading plant dynamic process simulation  

SciTech Connect (OSTI)

Ontario Power Generation Nuclear (OPGN) has a 4 x 880 MWe CANDU nuclear station at its Darlington Nuclear Div. located in Bowmanville. The station has been operating a Tritium Removal Facility (TRF) and a D{sub 2}O station Upgrading Plant (SUP) since 1989. Both facilities were designed with a Distributed Control System (DCS) and programmable logic controllers (PLC) for process control. This control system was replaced with a DCS only, in 1998. A dynamic plant simulator was developed for the Darlington TRF (DTRF) and the SUP, as part of the computer control system replacement. The simulator was used to test the new software, required to eliminate the PLCs. The simulator is now used for operator training and testing of process control software changes prior to field installation. Dynamic simulation will be essential for the ITER isotope separation system, where the process is more dynamic than the relatively steady-state DTRF process. This paper describes the development and application of the DTRF and SUP dynamic simulator, its benefits, architecture, and the operational experience with the simulator. (authors)

Busigin, A. [NITEK USA, Inc., 6405 NW 77 PL, Parkland, FL 33067 (United States); Williams, G. I. D.; Wong, T. C. W.; Kulczynski, D.; Reid, A. [Ontario Power Generation Nuclear, Box 4000, Bowmanville, ON L1C 3Z8 (Canada)

2008-07-15T23:59:59.000Z

414

Development of COTS ADC SEE Test System for the ATLAS LAr Calorimeter Upgrade  

E-Print Network [OSTI]

Radiation-tolerant, high speed, high density and low power commercial off-the-shelf (COTS) analog-to-digital converters (ADCs) are planned to be used in the upgrade to the Liquid Argon (LAr) calorimeter front end (FE) trigger readout electronics. Total ionization dose (TID) and single event effect (SEE) are two important radiation effects which need to be characterized on COTS ADCs. In our initial TID test, Texas Instruments (TI) ADS5272 was identified to be the top performer after screening a total 17 COTS ADCs from different manufacturers with dynamic range and sampling rate meeting the requirements of the FE electronics. Another interesting feature of ADS5272 is its 6.5 clock cycles latency, which is the shortest among the 17 candidates. Based on the TID performance, we have designed a SEE evaluation system for ADS5272, which allows us to further assess its radiation tolerance. In this paper, we present a detailed design of ADS5272 SEE evaluation system and show the effectiveness of this system while evalu...

Hu, Xueye; Chen, Kai; Mead, Joseph; Liu, Shubin; An, Qi

2014-01-01T23:59:59.000Z

415

TORCH — an Innovative High-Precision Time-of-Flight PID Detector for the LHCb Upgrade  

E-Print Network [OSTI]

TORCH is a Cherenkov time-of-flight detector being developed as a particle identification system for the upgraded LHCb experiment. The DIRC-type detector is located at 10m distance from the interaction point with an area of 30m$^2$ and is formed from 10mm thick synthetic amorphous fused silica plates. In this Cherenkov radiator the photons that propagate by total internal reflection to the plate edge are focussed onto an array of position-sensitive micro-channel plate sensors. Combining the photon timings the goal is to achieve a $\\sigma$ = 15 ps timing resolution per particle, yielding 3$\\sigma$ pion-kaon separation up to 10 GeV/c or better. Requirements for the photon detectors are presented together with preliminary prototype results. Preparations for the upcoming test beam are discussed. Optical design studies have been performed for using one of the available bar boxes of the BaBar DIRC detector containing assembled quartz radiator bars in a future test beam experiment.

Fohl, Klaus

2015-01-01T23:59:59.000Z

416

Design aspects of upgradation from 6 pulse to 12 pulse operation of NHVDC project  

SciTech Connect (OSTI)

In India, the first HVDC project was a back to back link between the northern grid and the Western grid at Vindhyachal. This project was commissioned by an external agency. By 1982 it was abundantly clear that HVDC would find a significant place in Indian power system. Government of India in its wisdom approved a proposal for an experimental HVDC line project to give Indian planners, manufacturers and utilities an opportunity to absorb the technology. The stage-1 of this National HVDC (NHVDC) project was successfully commissioned in October 1990, and has since been operating quite satisfactorily. In continuation of that effort, Government of India has since approved stage-2 of NHVDC project, which is under execution, at present. In stage-1, the challenge was to do the system studies, manufacture main circuit equipment and develop a controller. In stage-2 the focus will be on modernization and project engineering. The major change in stage-2 shall be the modernization of the controls. Upgradation details and the care being taken to have minimum disturbance to the existing setup, it discussed in this paper. The operational requirements, system solutions and control system aspects which have been considered and are being implemented for this project are also covered.

Singhal, A.; Gera, R.; Tripathy, A.K.; Adhikari, T.; Hanif, M. [Bharat Heavy Electricals Ltd., New Delhi (India). Transmission Projects Dept.; Prakash, K.S.; Das, R.L. [Bharat Heavy Electricals Ltd., Bangalore (India). Electronics Div.

1995-12-31T23:59:59.000Z

417

The Relativistic Heavy Ion Collider (RHIC) Refrigerator System at Brookhaven National Laboratory: Phase III of the System Performance and Operations Upgrades for 2006  

Science Journals Connector (OSTI)

An ongoing program at Brookhaven National Laboratory (BNL) consists of improving the efficiency of the Relativistic Heavy Ion Collider (RHIC) cryogenic system and reducing its power consumption. Phase I and II of the program addressed plant operational improvements and modifications that resulted in substantial operational cost reduction and improved system reliability and stability and a compressor input power reduction of 2 MW has been demonstrated. Phase III now under way consists of plans for further increasing the efficiency of the plant by adding a load “wet” turbo?expander and its associated heat exchangers at the low temperature end of the plant. This additional stage of cooling at the coldest level will further reduce the required compressor flow and therefore compressor power input. This paper presents the results of the plant characterization as it is operating presently as well as the results of the plant simulations of the various planned upgrades for the plant. The immediate upgrade includes the changes associated with the load expander. The subsequent upgrade will involve the resizing of expander 5 and 6 to increase their efficiencies. The paper summarizes the expected improvement in the plant efficiency and the overall reduction in the compressor power.

A. Sidi?Yekhlef; R. Than; J. Tuozzolo; V. Ganni; P. Knudsen; D. Arenius

2006-01-01T23:59:59.000Z

418

LOW LEVEL LIQUID RADIOACTIVE WASTE TREATMENT AT MURMANSK, RUSSIA: FACILITY UPGRADE AND EXPANSION  

SciTech Connect (OSTI)

Today there exist many almost overfilled storage tanks with liquid radioactive waste in the Russian Federation. This waste was generated over several years by the civil and military utilization of nuclear power. The current waste treatment capacity is either not available or inadequate. Following the London Convention, dumping of the waste in the Arctic seas is no longer an alternative. Waste is being generated from today's operations, and large volumes are expected to be generated from the dismantling of decommissioned nuclear submarines. The US and Norway have an ongoing co-operation project with the Russian Federation to upgrade and expand the capacity of a treatment facility for low level liquid waste at the RTP Atomflot site in Murmansk. The capacity will be increased from 1,200 m{sup 3}/year to 5,000 m{sup 3} /year. The facility will also be able to treat high saline waste. The construction phase will be completed the first half of 1998. This will be followed by a start-up and a one year post-construction phase, with US and Norwegian involvement for the entire project. The new facility will consist of 9 units containing various electrochemical, filtration, and sorbent-based treatment systems. The units will be housed in two existing buildings, and must meet more stringent radiation protection requirements that were not enacted when the facility was originally designed. The US and Norwegian technical teams have evaluated the Russian design and associated documentation. The Russian partners send monthly progress reports to US and Norway. Not only technical issues must be overcome but also cultural differences resulting from different methods of management techniques. Six to eight hour time differentials between the partners make real time decisions difficult and relying on electronic age tools becomes extremely important. Language difficulties is another challenge that must be solved. Finding a common vocabulary, and working through interpreters make the process very vulnerable. Each of these obstacles can be overcome when there is a common goal and vision shared by all parties and adequate funds are provided to accomplish the task. The upgrading and expansion of this facility and the construction of a similar facility on the Far East coast of Russia will enable the Russians to sign the London Convention dumping prohibition. This project is one of the first waste management construction projects in the north-west of Russia with foreign contribution. Its success may open for additional co-operative projects with Russia in the future.

BOWERMAN,B.; CZAJKOWSKI,C.; DYER,R.S.; SORLIE,A.

2000-03-01T23:59:59.000Z

419

FPGA-based Upgrade to RITS-6 Control System, Designed with EMP Considerations  

SciTech Connect (OSTI)

The existing control system for the RITS-6, a 20-MA 3-MV pulsed-power accelerator located at Sandia National Laboratories, was built as a system of analog switches because the operators needed to be close enough to the machine to hear pulsed-power breakdowns, yet the electromagnetic pulse (EMP) emitted would disable any processor-based solutions. The resulting system requires operators to activate and deactivate a series of 110-V relays manually in a complex order. The machine is sensitive to both the order of operation and the time taken between steps. A mistake in either case would cause a misfire and possible machine damage. Based on these constraints, a field-programmable gate array (FPGA) was chosen as the core of a proposed upgrade to the control system. An FPGA is a series of logic elements connected during programming. Based on their connections, the elements can mimic primitive logic elements, a process called synthesis. The circuit is static; all paths exist simultaneously and do not depend on a processor. This should make it less sensitive to EMP. By shielding it and using good electromagnetic interference-reduction practices, it should continue to operate well in the electrically noisy environment. The FPGA has two advantages over the existing system. In manual operation mode, the synthesized logic gates keep the operators in sequence. In addition, a clock signal and synthesized countdown circuit provides an automated sequence, with adjustable delays, for quickly executing the time-critical portions of charging and firing. The FPGA is modeled as a set of states, each state being a unique set of values for the output signals. The state is determined by the input signals, and in the automated segment by the value of the synthesized countdown timer, with the default mode placing the system in a safe configuration. Unlike a processor-based system, any system stimulus that results in an abort situation immediately executes a shutdown, with only a tens-of-nanoseconds delay to propagate across the FPGA. This paper discusses the design, installation, and testing of the proposed system upgrade, including failure statistics and modifications to the original design.

Harold D. Anderson, John T. Williams

2009-07-01T23:59:59.000Z

420

Mechanical Analysis of the 400 MHz RF-Dipole Crabbing Cavity Prototype for LHC High Luminosity Upgrade  

SciTech Connect (OSTI)

The proposed LHC high luminosity upgrade requires two crabbing systems in increasing the peak luminosity, operating both vertically and horizontally at two interaction points of IP1 and IP5. The required system has tight dimensional constraints and needs to achieve higher operational gradients. A proof-of-principle 400 MHz crabbing cavity design has been successfully tested and has proven to be an ideal candidate for the crabbing system. The cylindrical proof-of-principle rf-dipole design has been adapted in to a square shaped design to further meet the dimensional requirements. The new rf-dipole design has been optimized in meeting the requirements in rf-properties, higher order mode damping, and multipole components. A crabbing system in a cryomodule is expected to be tested on the SPS beam line prior to the test at LHC. The new prototype is required to achieve the mechanical and thermal specifications of the SPS test followed by the test at LHC. This paper discusses the detailed mechanical and thermal analysis in minimizing Lorentz force detuning and sensitivity to liquid He pressure fluctuations.

De Silva, Subashini U. [ODU; Park, HyeKyoung [ODU, JLAB; Delayen, Jean R. [ODU, JLAB; Li, Z. [SLAC

2013-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Solar Classroom Update: Making Clean Energy Upgrades a Back-to-School  

Broader source: Energy.gov (indexed) [DOE]

Classroom Update: Making Clean Energy Upgrades a Classroom Update: Making Clean Energy Upgrades a Back-to-School Priority Solar Classroom Update: Making Clean Energy Upgrades a Back-to-School Priority August 21, 2013 - 2:52pm Addthis Watch as Aaron Sebens, a fourth-grade teacher in Durham, North Carolina, gives an update on his student's solar-powered classroom project. Erin R. Pierce Erin R. Pierce Digital Communications Specialist, Office of Public Affairs Clean Energy Resources Watch our first video on the solar-powered classroom. Check out Lawrence Berkeley National Laboratory's guide on planning and financing energy upgrades for schools. Visit Energy Saver for more resources on saving energy and money. This week, Energy.gov is heading back to school. We'll be featuring stories on the role students and schools play in driving America's energy

422

EA-1906: Operations, Consolidation, and Upgrades at the Office of Secure  

Broader source: Energy.gov (indexed) [DOE]

6: Operations, Consolidation, and Upgrades at the Office of 6: Operations, Consolidation, and Upgrades at the Office of Secure Transportation Western Command Site, Albuquerque, NM EA-1906: Operations, Consolidation, and Upgrades at the Office of Secure Transportation Western Command Site, Albuquerque, NM Summary This EA evaluates environmental impacts associated with the siting and construction of several proposed buildings, including a new vehicle maintenance facility and mobile equipment maintenance building (and their support structures) at the Western Command Site, Albuquerque, NM. Public Comment Opportunities None available at this time. Documents Available for Download July 10, 2012 EA-1906: Finding of No Significant Impact Operations, Upgrades, and Consolidation at the Western Command Site, NM July 10, 2012 EA-1906: Final Environmental Assessment

423

Saving Money on Your Energy-Saving Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Saving Money on Your Energy-Saving Upgrades Saving Money on Your Energy-Saving Upgrades Saving Money on Your Energy-Saving Upgrades August 16, 2011 - 11:17am Addthis Eric Barendsen Energy Technology Program Specialist, Office of Energy Efficiency and Renewable Energy Summer is one of the best times of the year to get motivated to make those energy efficiency upgrades on your to-do list, and the Department of Energy can point you to some incentives to make the initial investment more affordable. Energy-saving products will save you considerable money over the long term, helping these products pay for themselves and significantly reducing your monthly energy bills. Homeowners ready to take advantage of the savings should check out the energy efficiency tax credits offered through the IRS and promoted by the

424

EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, 48: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona EA-1948: Gila-North Gila Rebuild and Upgrade Project, Yuma County, Arizona SUMMARY DOE's Western Area Power Administration (Western) is preparing an EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile transmission lines between the Gila and North Gila Substations and take actions in support of portions of Arizona Public Service's construction of a new, 12.8 mile 230-kV transmission line between North Gila and a proposed substation in Yuma County, Arizona. The U.S. Bureau of Reclamation and U.S. Army Corps of Engineers are cooperating agencies. PUBLIC COMMENT OPPORTUNITIES Send comments on the Draft Environmental Assessment by January 21, 2014, by

425

Have You Added Value to Your Home with Energy Saving Upgrades? | Department  

Broader source: Energy.gov (indexed) [DOE]

Have You Added Value to Your Home with Energy Saving Upgrades? Have You Added Value to Your Home with Energy Saving Upgrades? Have You Added Value to Your Home with Energy Saving Upgrades? July 15, 2011 - 3:47pm Addthis This week, Eric shared his thoughts on Building Value with Energy-Saving Upgrades in Homes and Businesses. He also mentioned the U.S. Department of Energy's Commercial Building Initiative, which is a partnership between the department and industry representatives to encourage the development of higher commercial building efficiency measures. Read the full text of the partnership agreement. How about you? Have you done any energy-efficient remodeling and seen your home increase in either value or appeal to potential buyers? Or are you planning to do so in the next few years? Each week, you have the chance to share your thoughts on a question about

426

U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava  

Broader source: Energy.gov (indexed) [DOE]

And Russia Complete Nuclear Security Upgrades Under Bratislava And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative U.S. And Russia Complete Nuclear Security Upgrades Under Bratislava Initiative December 23, 2008 - 9:18am Addthis WASHINGTON, DC -The U.S. Department of Energy today delivered the Bratislava Nuclear Security report to the White House, which detailed the status of work agreed to by Presidents Bush and Putin in Bratislava in 2005. U.S. and Russian officials from the U.S. Department of Energy's National Nuclear Security Administration (NNSA), the U.S. Department of Defense, the Russian Ministry of Defense and State Atomic Energy Corporation "Rosatom" reviewed work to complete nuclear security upgrades in Russia at meetings in Moscow last week. Building on this success, both

427

Microsoft Word - CX-BettasRd-ColumbiaThermalUpgradeFY12_WEB.docx  

Broader source: Energy.gov (indexed) [DOE]

25, 2012 25, 2012 REPLY TO ATTN OF: KEPR-4 SUBJECT: Environmental Clearance Memorandum Chad Hamel Project Manager - TEP-TPP-1 Proposed Action: Bettas Road-Columbia No. 1 230-kV transmission line thermal upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.13, Upgrading and rebuilding existing powerlines Location: Kittitas and Chelan counties, WA Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The project, as proposed, is to upgrade the existing Bettas Road-Columbia No. 1 230-kV transmission line to a maximum operating temperature of 100 °C. Five small segments (equal to approximately 3 miles) along the transmission line will be upgraded in order to meet this overall objective. Construction includes the relocation and

428

FY 2013 Reactor Upgrades FOA (DE-FOA-0000815) | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

3 Reactor Upgrades FOA (DE-FOA-0000815) 3 Reactor Upgrades FOA (DE-FOA-0000815) FY 2013 Reactor Upgrades FOA (DE-FOA-0000815) This Funding Opportunity Announcement (FOA) is the fiscal year 2013 solicitation for Nuclear Energy University Programs (NEUP) University Reactor Upgrades Infrastructure Support for the Department of Energy's (DOE) Office of Nuclear Energy (NE). The development of nuclear energy-related infrastructure and basic capabilities in the university and college community is necessary to promote R&D that supports nuclear science and engineering (NS&E), DOE-NE's mission, and the Nation's nuclear energy challenges. Accordingly, we intend to enable the education and training of nuclear scientists, engineers, and policy-makers in graduate and undergraduate study and two-year programs, as well as R&D that is relevant to the

429

ASDEX-UPGRADE TOKAMAK EMULATOR FOR TEST OF CONTROL SYSTEM AND SHOT PROGRAMME  

E-Print Network [OSTI]

for controlled nuclear fusion. Its main component is a vacuum vessel, in torus shape, in which the plasma is kept, their output is the control system's output. At ASDEX-Upgrade only used as input for the emulator to close

Zachmann, Gabriel

430

Guidelines for Home Energy Professionals: Standard Work Specifications for Single-Family Home Energy Upgrades  

Broader source: Energy.gov [DOE]

The Standard Work Specifications (SWS) for Single-Family Home Energy Upgrades define the minimum acceptable outcomes for any weatherization or home performance task to be effective, durable, and safe.

431

Automation of airlift scheduling for the upgraded command and control system of military airlift command  

E-Print Network [OSTI]

This report describes a conceptual design for automation of the scheduling of airlift activities as part of the current upgrade of the MAC C2 System. It defines the airlift scheduling problem in generic terms before reviewing ...

Simpson, R. W.

1984-01-01T23:59:59.000Z

432

New challenges in beamline instrumentation for the ESRF Upgrade Programme Phase II  

Science Journals Connector (OSTI)

A comprehensive review of some of the challenges in scientific instrumentation encountered by the ESRF in the context of the preparation of the Phase II of its upgrade programme is presented.

Susini, J.

2014-08-29T23:59:59.000Z

433

Participation as an end versus a means : understanding a recurring dilemma in urban upgrading  

E-Print Network [OSTI]

Since the 1920s, participatory approaches to urban upgrading in developing nations have demonstrated that involving the urban poor in the physical, social, and economic development of their settlements could improve their ...

Fallavier, Pierre

2007-01-01T23:59:59.000Z

434

Transcript of April 11, 2013, TAP webinar titled Financing Energy Upgrades for K-12 School Districts  

Broader source: Energy.gov [DOE]

U.S. Department of Energy (DOE) Technical Assistance Program (TAP) transcript of a TAP webinar held on April 11, 2013 and dealing with how to finance energy efficiency upgrades for K-12 school districts.

435

Bioenergy Technologies Office Conversion R&D Pathway: Syngas Upgrading to Hydrocarbon Fuels  

Broader source: Energy.gov [DOE]

Syngas upgrading to hydrocarbon fuels is one of eight priority pathways chosen to convert biomass into hydrocarbon fuels by the Bioenergy Technologies Office. These pathways were down-selected from an initial list of 18.

436

All that glitters is not gold : unexpected lessons from a slum upgrading program in Brazil  

E-Print Network [OSTI]

This paper looks at the Ribeira Azul Slum Upgrading Program in Salvador de Bahia Brazil, implemented by the development agency of the state of Bahia, CONDER, and the Italian NGO Associazione Volontari per il Servizio ...

Zuin, Valentina

2005-01-01T23:59:59.000Z

437

INTEGRATED CONCEPTS FOR REUSE OF UPGRADED WASTEWATER – ROLE OF MEMBRANES IN WATER RECYCLING  

Science Journals Connector (OSTI)

The AQUAREC project on “Integrated Concepts for Reuse of Upgraded Wastewater” is funded by the European Commission within the 5th Framework Programme as well as in Australia by the Commonwealth Department of E...

THOMAS WINTGENS; THOMAS MELIN; DAVIDE BIXIO…

2006-01-01T23:59:59.000Z

438

Upgrading of Fast Pyrolysis Oil via HDO Using Nano-Structured Catalysts.  

E-Print Network [OSTI]

??The effects of type of solvents (hydro-treated or upgraded pyrolysis oil and ethanol) on hydro-de-oxygenation (HDO) of fast pyrolysis oil were studied. The presence and… (more)

Ahmadi, Shima

2014-01-01T23:59:59.000Z

439

EIS-0484: Montana-to-Washington Transmission System Upgrade Project in  

Broader source: Energy.gov (indexed) [DOE]

4: Montana-to-Washington Transmission System Upgrade Project 4: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana EIS-0484: Montana-to-Washington Transmission System Upgrade Project in Washington, Idaho, and Montana SUMMARY This EIS will evaluate the environmental impacts of a proposal to replace roughly 12 miles of transmission line on the Taft-Dworshak 500-kV transmission line, install new series capacitors on the Garrison-Taft 500-kV transmission line, and perform various upgrades to Bell, Hatwai, Dworshak, Garrison, and Hot Springs substations. The project website is http://efw.bpa.gov/environmental_services/Document_Library/M2W/. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVALABLE FOR DOWNLOAD May 3, 2012 EIS-0484: Notice of Intent to Prepare an Environmental Impact Statement

440

EA-1247: Electrical Power System Upgrades at Los Alamos National Laboratory, Los Alamos, New Mexico  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts for the proposal to upgrade the electrical power supply system for the U.S. Department of Energy Los Alamos National Laboratory to increase the...

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

A Superconducting Magnet Upgrade of the ATF2 Final Focus  

SciTech Connect (OSTI)

The ATF2 facility at KEK is a proving ground for linear collider technology with a well instrumented extracted beam line and Final Focus (FF). The primary ATF2 goal is to demonstrate the extreme beam demagnification and spot stability needed for a linear collider FF. But the ATF2 FF uses water cooled magnets and the ILC baseline has a superconducting (SC) FF. We plan to upgrade ATF2 and replace some of the warm FF magnets with SC FF magnets. The ATF2 SC magnets, like the ILC FF, will made via direct wind construction. ATF2 coil winding is in progress at BNL and warm magnetic measurements indicate we have achieved good field quality. Studies indicate that having ATF2 FF magnets with larger aperture and better field quality should allow reducing the ATF2 FF beta function for study of focusing regimes relevant to CLIC. The ATF2 magnet cryostat will have laser view ports for directly monitoring cold mass movement. We plan to make stability measurements at BNL and KEK to relate ATF2 FF magnet performance to that of a full length ILC QD0 R and D FF prototype under construction at BNL.

Parker B.; Anerella M.; Escallier J.; He P.; Jain A.; Marone A.; Wanderer P.; Wu K.C.; Hauviller C.; Marin E.; Tomas R.; Zimmermann F.; Bolzon B.; Jeremie A.; Kimura N.; Kubo K.; Kume T.; Kuroda S.; Okugi T.; Tauchi T.; Terunuma N.; Tomaru T.; Tsuchiya K.; Urakawa J.; Yamamoto A.; Bambabe P.; Coe P.; Urner D.; Seryi A.; Spencer C.; White G.

2010-05-23T23:59:59.000Z

442

A Superconducting Magnet Upgrade of the ATF2 Final Focus  

SciTech Connect (OSTI)

The ATF2 facility at KEK is a proving ground for linear collider technology with a well instrumented extracted beam line and Final Focus (FF). The primary ATF2 goal is to demonstrate the extreme beam demagnification and spot stability needed for a linear collider FF. But the ATF2 FF uses water cooled magnets and the ILC baseline has a superconducting (SC) FF. We plan to upgrade ATF2 and replace some of the warm FF magnets with SC FF magnets. The ATF2 SC magnets, like the ILC FF, will made via direct wind construction. ATF2 coil winding is in progress at BNL and warm magnetic measurements indicate we have achieved good field quality. Studies indicate that having ATF2 FF magnets with larger aperture and better field quality should allow reducing the ATF2 FF beta function for study of focusing regimes relevant to CLIC. The ATF2 magnet cryostat will have laser view ports for directly monitoring cold mass movement. We plan to make stability measurements at BNL and KEK to relate ATF2 FF magnet performance to that of a full length ILC QD0 R&D FF prototype under construction at BNL.

Parker, Brett; /Brookhaven; Anerella, Michael; /Brookhaven; Escallier, John; /Brookhaven; He, Ping; /Brookhaven; Jain, Animesh; /Brookhaven; Marone, Andrew; /Brookhaven; Wanderer, Peter; /Brookhaven; Wu, Kuo-Chen; /Brookhaven; Bambade, Philip; /Orsay, LAL; Bolzon, Benoit; /Annecy, LAPP; Jeremie, Andrea; /Annecy, LAPP; Coe, Paul; /Oxford U.; Urner, David /Oxford U.; Hauviller, Claude; /CERN; Marin, Eduardo; /CERN; Tomas, Rogelio; /CERN; Zimmermann, Frank; /CERN; Kimura, Nobuhiro; /KEK, Tsukuba; Kubo, Kiyoshi; /KEK, Tsukuba; Kume, Tatsuya /KEK, Tsukuba; Kuroda, Shigeru; /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /KEK, Tsukuba /SLAC /SLAC /SLAC

2012-07-05T23:59:59.000Z

443

The NIR Upgrade to the SALT Robert Stobie Spectrograph  

E-Print Network [OSTI]

The near infrared (NIR) upgrade to the Robert Stobie Spectrograph (RSS) on the Southern African Large Telescope (SALT), RSS/NIR, extends the spectral coverage of all modes of the visible arm. The RSS/NIR is a low to medium resolution spectrograph with broadband imaging, spectropolarimetric, and Fabry-Perot imaging capabilities. The visible and NIR arms can be used simultaneously to extend spectral coverage from approximately 3200 A to 1.6 um. Both arms utilize high efficiency volume phase holographic gratings via articulating gratings and cameras. The NIR camera is designed around a 2048x2048 HAWAII-2RG detector housed in a cryogenic dewar. The Epps optical design of the camera consists of 6 spherical elements, providing sub-pixel rms image sizes of 7.5 +/- 1.0 um over all wavelengths and field angles. The exact long wavelength cutoff is yet to be determined in a detailed thermal analysis and will depend on the semi-warm instrument cooling scheme. Initial estimates place instrument limiting magnitudes at J = 23.4 and H(1.4-1.6 um) = 21.6 for S/N = 3 in a 1 hour exposure well below the sky noise.

Andrew I. Sheinis; Marsha J. Wolf; Matthew A. Bershady; David A. H. Buckley; Kenneth H. Nordsieck; Ted B. Williams

2006-06-05T23:59:59.000Z

444

Upgrading the performance of groudwater VOC air strippers  

SciTech Connect (OSTI)

Rocketdynes Santa Susana Field Laboratory has been treating groundwater to remove chlorinated solvents since 1987. Six air stripping treatment installations, using vapor-phase carbon to control air emissions, have consistently met effluent quality standards over nine years of operation. In 1995, Rocketdyne embarked on an inspection and maintenance program to thoroughly check tower equipment and packing condition and to improve treatment efficiency using new packing technology now available. Baseline removal efficiency measurements were made on one large-capacity air stripper, which was then shut down for inspection. The original random packing was found to be fouled, and had settled too far below the level of the spray nozzle. The packing was removed, and replaced with a newer, high-efficiency packing. As a result, single-stage removal efficiency for trichloroethylene increased from 98.5% to > 99.60%. Aside from demonstrating the improvement attainable by upgrading the packing media, Rocketdyne`s maintenance program also highlighted the critical importance of proper liquid distribution. At one point, the refurbished air stripper was overpacked, resulting in concentration of the water spray near the center of the packed section. The liquid distribution was found to remain grossly nonuniform even after the water had trickled down over 8.2 meters of packing in a 91-cm diameter column. 4 refs., 1 fig., 5 tabs.

Nelson, A.D. [Rockwell International Corp., Canoga Park, CA (United States); Schmitt, R.J. [EnviroSolve Corp., Agoura Hills, CA (United States); Dickeson, D. [Lantec Products, Inc., Agoura Hills, CA (United States)

1997-12-31T23:59:59.000Z

445

OPERATIONAL EXPERIENCE OF THE UPGRADED CRYOGENIC SYSTEMS AT THE NSCL  

SciTech Connect (OSTI)

The National Superconducting Cyclotron Laboratory (NSCL) is a NSF-supported facility, with additional support from Michigan State University (MSU) for conducting research in nuclear and accelerator science. The facility consists of two superconducting cyclotrons and over fifty individual cryostats, each containing several superconducting magnets that are used in the beam transport system. Beginning in 1999 a major facility upgrade was started. New, larger magnets were added, increasing the total 4.5 K loads, necessitating an increase of the cryogenic capacity. A helium plant (nominal 1750-Watt at 4.5 K) was acquired from the United States Bureau of Mines where it had been operating as a pure liquefier since the early 1980's. It was refurbished for the NSCL with extensive support from the cryogenics group at Thomas Jefferson National Laboratory. The new cryogenic system came online early in 2001. The cold-mass is relatively high in relation to the installed capacity, presenting challenges during cool downs. Reliability over the last five years has been greater than 99%. An overview of the last seven years of operations of our cryogenic systems is presented that includes normal operations, testing of new equipment, noteworthy breakdowns, routine maintenance, and system reliability.

McCartney, A. H.; Laumer, H. L.; Jones, S. A. [National Superconducting Cyclotron Laboratory, Michigan State University, East Lansing, MI, 48824 (United States)

2010-04-09T23:59:59.000Z

446

Prototype of time digitizing system for BESIII endcap TOF upgrade  

E-Print Network [OSTI]

The prototype of time digitizing system for the upgrade of BESIII endcap TOF (ETOF) is introduced in this paper. The ETOF readout electronics has a formation of distributed architecture that hit signal from multi-gap resistive plate chamber (MRPC) is signaled as LVDS by front-end electronics (FEE) and sent to the back-end time digitizing system via long shield differential twisted pair cables. The ETOF digitizing system consists of 2 VME crates each of which contains modules of time digitizing, clock, trigger and fast control etc. The time digitizing module (TDIG) of this prototype can support up to 72 electrical channels of hit information measurement. The fast control (FCTL) module can operate at barrel or endcap mode. The barrel FCTL fans fast control signals from the trigger system out to endcap FCTLs, merges data from endcaps and transfers to the trigger system. Without modifying the barrel TOF structure, this time digitizing architecture benefits for improving ETOF performance without degrading barrel TOF measuring. Lab experiments show that the time resolution of this digitizing system can be less than 20ps, and the data throughput to DAQ can be about 92Mbps. Beam experiments show that the complete time resolution can be less than 45ps.

Cao Ping; Sun Wei-Jia; Ji Xiao-Lu; Fan Huan-Huan; Wang Si-Yu; Liu Shu-Bin; An Qi

2013-05-30T23:59:59.000Z

447

Co-processing studied for upgrading low grade feedstocks  

SciTech Connect (OSTI)

In the future refiners will have to consider processing bottom-of-the-barrel feedstocks to a much greater extent. A serious decline in light oil production and light oil find rates in the Western Hemisphere and in the North Sea, along with the politically-controlled availability of Middle East petroleum supplies, indicate that there is a need for technology that will give the refiner greater flexibility in feedstock selection and processability. At the American Chemical Society's Spring Conference in New York, Lummus Crest, Inc. (LCI) presented a paper on the co-processing of petroleum feedstocks with other more plentiful and less costly fuels, one route to satisfying the refiners' needs. LCI has formulated a concept for co-processing bottom-of-the-barrel oils with coal and other solid carbonaceous feedstocks to produce high quality distillate fuels. The concept is based on a two-stage approach in which the solid carbonaceous feedstocks are converted to liquids in a thermal reaction zone without any externally-supplied catalysts followed by catalytic hydroprocessing of the thermal stage products together with petroleum in an expanded-bed hydrotreater. The unconverted solids from the thermal reactor can be removed by known solids separation techniques, such as Anti-Solvent Deashing (ASDA), prior to upgrading in the expanded-bed hydrotreater. A distillate fraction from the hydrotreater can be recycled to serve as the slurry vehicle for the solid carbonaceous feedstock.

Not Available

1986-09-01T23:59:59.000Z

448

Study of GSO scintillator for the LHCf upgrade  

SciTech Connect (OSTI)

The GSO scintillator has a very excellent radiation resistance, fast decay time and large amounts of light yield. Because of these features, GSO will be used to upgrade the current LHCf detector. We examined the features of GSO by using heavy ion beam at Heavy Ion Medical Accelerator in Chiba (HIMAC) Japan. The linearity of PMT R7400 for the large light yield of GSO with a {sup 132}Xe beam and the radiation hardness with a {sup 12}C beam were measured. As a result, GSO scintillator showed a good linearity up to the signal corresponding to 6 TeV EM-shower maximum in the LHCf detector, and a good radiation hardness up to 7x10{sup 5} Gy. For the LHCf Arm1 detector, small scaled GSO crystals (GSO bars), have been fabricated for the position determination detector. 5 GSO bars have been manufactured and its performance have been evaluated using {sup 12}C beam. Its light yield and position dependency have been evaluated.

Kawade, K.; Fukatsu, K.; Itow, Y.; Mase, T.; Masuda, K.; Matsubara, Y.; Mitsuka, G.; Sako, T.; Suzuki, K.; Taki, K. [Solar-Terrestrial Environment Laboratory, Nagoya University, Nagoya (Japan); Suzuki, T.; Kasahara, K.; Nakai, M.; Torii, S. [Research Institute for Science and Engineering, Waseda University, Tokyo (Japan); Adriani, O.; Bonechi, L.; D'Alessandro, R. [Universita degli Studi di Firenze and INFN Sezione di Firenze, Firenze (Italy); Bongi, M.; Menjo, H.; Papini, P. [INFN Sezione di Firenze, Firenze (Italy)

2011-09-22T23:59:59.000Z

449

Energy Sciences Network (ESnet)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages

ESnet ESnet ESnet ESnet ESnet ESnet » MyESnet search... Go Home Network Overview Tools Peering Information Interactive Network Map Network Maps Connected Sites Services Overview ECS Audio/Video Conferencing Fasterdata IPv6 Network Network Performance Tools (perfSONAR) ESnet OID Registry PGP Key Service Virtual Circuits (OSCARS) DOE Grids Service Transition R&D Overview 100G Testbed Virtual Circuits (OSCARS) Performance (perfSONAR) Tools Development Green Networking Authentication & Trust Federation (ATF) Partnerships News & Publications ESnet in the News ESnet News Publications and Presentations Galleries ESnet Awards and Honors About ESnet Overview ESnet Staff Governance Our Network Case Studies ESnet Strategic Plan ESnet Organizational Chart ESnet History Science Requirements Careers Contact Us

450

High Resolution BPM Upgrade for the ATF Damping Ring at KEK  

E-Print Network [OSTI]

A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and processing, and also implements a new automatic gain error correction schema. The technical concept and realization as well as results of beam studies are presented.

Eddy, N; Fellenz, B; Gianfelice-Wendt, E; Prieto, P; Rechenmacher, R; Semenov, A; Voy, D; Wendt, M; Zhang, D; Terunuma, N; Urakawa, J

2012-01-01T23:59:59.000Z

451

Re: NBP RFI: Communications Requirements | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

NBP RFI: Communications Requirements NBP RFI: Communications Requirements Re: NBP RFI: Communications Requirements CTIA - The Wireless Association® ("CTIA")1 submits this response to the Department of Energy's ("DOE") Request for Information ("RFI") regarding the communications requirements of utilities pursuant to the National Broadband Plan.2 Wireless communications are a critical component of "Smart Grids" and commercial wireless networks can readily satisfy the communications requirements of Smart Grid applications. As CTIA explains below, (1) commercial wireless solutions are already meeting communications needs to implement the Smart Grid with both utility network and consumer applications; (2) commercial wireless networks" ubiquity, security and reliability support the operational requirements of Smart Grid

452

Real time MHD mode control using ECCD in KSTAR: Plan and requirements  

SciTech Connect (OSTI)

For a high-performance, advanced tokamak mode in KSTAR, we have been developing a real-time control system of MHD modes such as sawtooth and Neo-classical Tearing Mode (NTM) by ECH/ECCD. The active feedback control loop will be also added to the mirror position and the real-time detection of the mode position. In this year, for the stabilization of NTM that is crucial to plasma performance we have implemented open-loop ECH antenna control system in KSTAR Plasma Control System (PCS) for ECH mirror movement during a single plasma discharge. KSTAR 170 GHz ECH launcher which was designed and fabricated by collaboration with PPPL and POSTECH has a final mirror of a poloidally and toroidally steerable mirror. The poloidal steering motion is only controlled in the real-time NTM control system and its maximum steering speed is 10 degree/sec by DC motor. However, the latency of the mirror control system and the return period of ECH antenna mirror angle are not fast because the existing launcher mirror control system is based on PLC which is connected to the KSTAR machine network through serial to LAN converter. In this paper, we present the design of real time NTM control system, ECH requirements, and the upgrade plan.

Joung, M.; Woo, M. H.; Jeong, J. H.; Hahn, S. H.; Yun, S. W.; Lee, W. R.; Bae, Y. S.; Oh, Y. K.; Kwak, J. G.; Yang, H. L. [National Fusion Research Institute, 52 Eoeun-dong, Yuseong-gu, Daejeon (Korea, Republic of); Namkung, W.; Park, H.; Cho, M. H. [Department of Physics, POSTECH, Hyoja-dong, Nam-gu, Pohang, Gyeongangbuk-do (Korea, Republic of); Kim, M. H.; Kim, K. J.; Na, Y. S. [Department of Nuclear Engineering, Seoul National University, Daehak-dong, Gwanak-gu, Seoul (Korea, Republic of); Hosea, J.; Ellis, R. [Princeton Plasma Physics Laboratory, Princeton (United States)

2014-02-12T23:59:59.000Z

453

222-S radioactive liquid waste line replacement and 219-S secondary containment upgrade, Hanford Site, Richland, Washington  

SciTech Connect (OSTI)

The U.S. Department of Energy (DOE) is proposing to: (1) replace the 222-S Laboratory (222-S) radioactive liquid waste drain lines to the 219-S Waste Handling Facility (219-S); (2) upgrade 219-S by replacing or upgrading the waste storage tanks and providing secondary containment and seismic restraints to the concrete cells which house the tanks; and (3) replace the transfer lines from 219-S to the 241-SY Tank Farm. This environmental assessment (EA) has been prepared in compliance with the National Environmental Policy Act (NEPA) of 1969, as amended, the Council on Environmental Quality Regulations for Implementing the Procedural Provisions of NEPA (40 Code of Federal Regulations [CFR] 1500-1508), and the DOE Implementing Procedures for NEPA (10 CFR 1021). 222-S is used to perform analytical services on radioactive samples in support of the Tank Waste Remediation System and Hanford Site environmental restoration programs. Activities conducted at 222-S include decontamination of analytical processing and support equipment and disposal of nonarchived radioactive samples. These activities generate low-level liquid mixed waste. The liquid mixed waste is drained through pipelines in the 222-S service tunnels and underground concrete encasements, to two of three tanks in 219-S, where it is accumulated. 219-S is a treatment, storage, and/or disposal (TSD) unit, and is therefore required to meet Washington Administrative Code (WAC) 173-303, Dangerous Waste Regulations, and the associated requirements for secondary containment and leak detection. The service tunnels are periodically inspected by workers and decontaminated as necessary to maintain as low as reasonably achievable (ALARA) radiation levels. Although no contamination is reaching the environment from the service tunnels, the risk of worker exposure is present and could increase. 222-S is expected to remain in use for at least the next 30 years to serve the Hanford Site environmental cleanup mission.

NONE

1995-01-01T23:59:59.000Z

454

Advanced Scientific Computing Research Network Requirements  

E-Print Network [OSTI]

Plasma Physics Laboratory (PPPL). ESnet and ORNL willOSF PB/sec Pbps perfSONAR PF PPPL PTF PVFS QDR RDMA REST RPI

Dart, Eli

2014-01-01T23:59:59.000Z

455

Biological and Environmental Research Network Requirements  

E-Print Network [OSTI]

Globus Online is operated by Argonne National Laboratory andNational Laboratory, Argonne National Laboratory, BrookhavenCenter (NERSC) Hopper system, Argonne National Laboratory’s

Dart, Eli

2014-01-01T23:59:59.000Z

456

Advanced Scientific Computing Research Network Requirements  

E-Print Network [OSTI]

cover image courtesy of the Argonne Leadership ComputingFacility (ALCF), Argonne National Laboratory. Hopper image12 Argonne Leadership Computing Facility (

Dart, Eli

2014-01-01T23:59:59.000Z

457

SG Network System Requirements Specification- Interim Release...  

Energy Savers [EERE]

More Documents & Publications Report to NIST on the Smart Grid Interoperability Standards Roadmap Buildings-to-Grid Technical Opportunities: From the Information and Communications...

458

Science-Driven Network Requirements for ESnet  

E-Print Network [OSTI]

Magnetic Fusion Energy Science.Magnetic Fusion Energy Science..data sets Magnetic Fusion Energy Science Executive Summary

2006-01-01T23:59:59.000Z

459

HEP Science Network Requirements--Final Report  

E-Print Network [OSTI]

The next generation Dark Energy Survey, DES, with its 500surveys as a new and powerful approach to understanding cosmology and dark energy.

Dart Ed, Eli

2010-01-01T23:59:59.000Z

460

Advanced Scientific Computing Research Network Requirements  

E-Print Network [OSTI]

partners at LBNL and Princeton Plasma Physics Laboratory (Architecture petaflop Princeton Plasma Physics Laboratory

Dart, Eli

2014-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Biological and Environmental Research Network Requirements  

E-Print Network [OSTI]

Cesar Izaurralde, PNNL (GLBRC) Bill Johnston, ESnet (Bioenergy Research Center (GLBRC) needs assistance with dataBioenergy Research Center (GLBRC) has developed a high-

Dart, Eli

2014-01-01T23:59:59.000Z

462

Issues and R&D Required for the Intensity Frontier Accelerators  

SciTech Connect (OSTI)

Operation, upgrade and development of accelerators for Intensity Frontier face formidable challenges in order to satisfy both the near-term and long-term Particle Physics program. Here we discuss key issues and R&D required for the Intensity Frontier accelerators.

Shiltsev, V.; Henderson, S.; Hurh, P.; Kourbanis, I.; Lebedev, V.

2013-09-26T23:59:59.000Z

463

Smart power monitoring utility system using wireless sensor networks : a project report submitted in partial fulfilment of the requirements for the degree of Master of Engineering in Electronics and Electrical Engineering.  

E-Print Network [OSTI]

??The design and development of a Wireless Sensor Networks based Smart Grid for home utility system for power utility has been presented in this thesis.… (more)

Gill, Satinder Pal Singh

2013-01-01T23:59:59.000Z

464

E-Print Network 3.0 - asdex upgrade invited Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Axially Symmetric Divertor Experiment tokamak Plasma Physics and Controlled Nuclear Fusion... -modes discharges, but discharges of many types in ASDEX ... Source: Pitcher, C....

465

E-Print Network 3.0 - asdex upgrade enhancements Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Axially Symmetric Divertor Experiment tokamak Plasma Physics and Controlled Nuclear Fusion... -modes discharges, but discharges of many types in ASDEX ... Source: Pitcher, C....

466

Non-thermal plasma enhanced heavy oil upgrading  

Science Journals Connector (OSTI)

Abstract A process was proposed for upgrading heavy oil using non-thermal plasma technology in a conventional thermal cracking system under atmospheric pressure. Results from a comparison of the reactivity of a N2, H2 and CH4 plasma showed that the plasma can increase the trap oil yield significantly. The trap oil yield increased by ?9% when the N2 plasma was applied and showed a further increase of ?19% when the H2 or CH4 plasma was applied. A detailed study on the H2 plasma-enhanced upgrading process was carried out and the results showed that the trap oil yields of the plasma-on runs can be 8–33% higher than those of the plasma-off runs, depending on experimental conditions. Compared with the plasma-off runs, trap oil from the plasma-on runs had a higher (H/C)atomic but less heteroatoms (S and N). Over-balanced hydrogen in the products from plasma-on runs revealed the H2 plasma reactivity, which was further demonstrated by an increase in the substitution and condensation indices of trap oil from the plasma-on runs. Although thermal cracking was mainly involved whether the plasma was applied or not, the electrical field for generating the plasma and the generated plasma may assist with hydrocarbon bond cleavage. This was shown by the increased trap oil yield with the N2 plasma and the hydrogen and carbon residue distribution. Compared with the feedstock, more aromatic and ?-hydrogen (HA and H?, respectively) and less ?- and ?-hydrogen (H? and H?, respectively) were present in the residues, which agrees with the bond dissociation energy data. Similarly, the amounts of saturated (Cs) and alkyl (Cp) carbons in the residues were significantly lower than those in the feedstock while the amount of aromatic carbons (Ca) in the residues was higher than the feedstock. The changes in hydrogen and carbon distribution were more significant for the plasma-on runs. This implies that mainly side chain losses and bridged bond breakage are involved in the processes. This was demonstrated further by the molecular weight distribution. In general, the molecular weight of the residues was lower than that of the feedstock, especially for residues from the plasma-on runs. However, compared with the feedstock, the residues contained less saturated, aromatic and resin fractions but more asphaltene and toluene insoluble fractions. This implies that intra-molecular condensation was more significant than inter-molecular condensation, especially in the plasma-on runs. This should be attributed to the higher stabilization ability of the H2 plasma for fragments or radicals and gas (plasma) flow by which the fragments or radicals are separated rapidly.

Haigang Hao; Bao S. Wu; Jianli Yang; Qiang Guo; Yong Yang; Yong W. Li

2014-01-01T23:59:59.000Z

467

Multi-Resolution Storage and Search in Sensor Networks  

E-Print Network [OSTI]

users of a micro-climate monitoring network [Hamilton 2004]Fig. 21. Micro-climate monitoring sensor network deploymentNetworks Table I. Data Requirement Estimates for Scienti?c Applications Application Building Health Monitoring [Kohler] Micro-

Ganesan, Deepak; Greenstein, Ben; Estrin, D; Heidemann, John; Govindan, Ramesh

2007-01-01T23:59:59.000Z

468

Design and implementation of a distributed virtual machine for networked computers  

E-Print Network [OSTI]

. This partitioning of system functionality reduces resource requirements on network clients, improves site security

Mohri, Mehryar

469

Design review report: 200 East upgrades for Project W-314, tank farm restoration and safe operations  

SciTech Connect (OSTI)

This Design Review Report (DRR) documents the contractor design verification methodology and records associated with project W-314`s 200 East (200E) Upgrades design package. The DRR includes the documented comments and their respective dispositions for this design. Acceptance of the comment dispositions and closure of the review comments is indicated by the signatures of the participating reviewers. Project W-314 is a project within the Tank Waste Remediation System (TWRS) Tank Waste Retrieval Program. This project provides capital upgrades for the existing Hanford tank farm waste transfer, instrumentation, ventilation, and electrical infrastructure systems. To support established TWRS programmatic objectives, the project is organized into two distinct phases. The initial focus of the project (i.e., Phase 1) is on waste transfer system upgrades needed to support the TWRS Privatization waste feed delivery system. Phase 2 of the project will provide upgrades to support resolution of regulatory compliance issues, improve tank infrastructure reliability, and reduce overall plant operating/maintenance costs. Within Phase 1 of the W-314 project, the waste transfer system upgrades are further broken down into six major packages which align with the project`s work breakdown structure. Each of these six sub-elements includes the design, procurement, and construction activities necessary to accomplish the specific tank farm upgrades contained within the package. The first design package (AN Valve Pit Upgrades) was completed in November 1997, and the associated design verification activities are documented in HNF-1893. The second design package, 200 East (200E) Upgrades, was completed in March 1998. This design package identifies modifications to existing valve pits 241-AX-B and 241-A-B, as well as several new waste transfer pipelines to be constructed within the A Farm Complex of the 200E Area. The scope of the valve pit modifications includes new pit cover blocks, valve manifolds, leak detectors, and special protective coatings similar to those previously approved for the AN Valve Pit Upgrades design package. The new transfer lines included in this package (with official line number designations) are described within.

Boes, K.A.

1998-04-15T23:59:59.000Z

470

Development of hydrothermal liquefaction and upgrading technologies for lipid-extracted algae conversion to liquid fuels  

Science Journals Connector (OSTI)

Abstract Bench-scale tests were performed for lipid-extracted microalgae (LEA) conversion to liquid fuels via hydrothermal liquefaction (HTL) and upgrading processes. Process simulation and economic analysis for a large-scale LEA HTL and upgrading system were developed based on the best available experimental results. The system assumed an LEA feed rate of 608 dry metric tons/day and that the feedstock was converted to a crude HTL bio-oil and further upgraded via hydrotreating and hydrocracking to produce liquid fuels, mainly alkanes. Performance and cost results demonstrated that HTL and upgrading is effective for converting LEA to liquid fuels. The liquid fuels annual yield was estimated to be 26.9 million gallon gasoline-equivalent (GGE) and the overall energy efficiency on a higher heating value (HHV) basis was estimated to be 69.5%. The variation range of the minimum fuel selling price (MFSP) was estimated to be $2.07 to $7.11/GGE by combining the effects of selected process factors. Key factors affecting the production cost were identified to be the LEA feedstock cost, final products yields, and the upgrading equipment cost. The impact of plant scale on MFSP was also investigated.

Yunhua Zhu; Karl O. Albrecht; Douglas C. Elliott; Richard T. Hallen; Susanne B. Jones

2013-01-01T23:59:59.000Z

471

U.S.-Russia MPC and A upgrades at the Beloyarsk Nuclear Power Plant  

SciTech Connect (OSTI)

During the January 1996 meeting of the Gore-Chernomyrdin Commission, the Beloyarsk Nuclear Power Plant (BNPP) was identified as one of the additional sites for cooperative projects on upgrading Materials Protection, Control and Accounting (MPC and A). Since June 1996, Sandia National Laboratories (SNL), Pacific Northwest National Laboratories (PNNL), and Los Alamos National Laboratory (LANL) have worked with BNPP to upgrade MPC and A at the facility. Some unique challenges were encountered because BNPP has an operating BN-600 600-Megawatt breeder reactor. SNL has been responsible for working with BNPP to implement physical protection upgrades to the Central Alarm Station, Fresh Fuel Storage building, Spent Fuel Storage Area, and Vehicle/Personnel Portal. In addition, improved communication equipment for the Ministry of the Interior (MVD) guards and training of personnel were provided. PNNL has been responsible for coordinating Material Control and Accounting (MC and A) upgrades at BNPP. PNNL, in conjunction with LANL, has implemented such MC and A upgrades as a computerized nuclear materials accounting system, training in MC and A elements, nondestructive assay instrumentation for fresh fuel, installation of a fork detector for measuring spent fuel, and installation of an underwater video camera for verification of spent fuel serial numbers.

Saraev, O. [Beloyarsk Nuclear Power Plant, Zarechny (Russian Federation); Haase, M.; Smarto, C. [Dept. of Energy, Washington, DC (United States); Mikkelsen, K.; Heinberg, C. [Pacific Northwest National Labs., Richland, WA (United States); Showalter, R.; Soo Hoo, M. [Sandia National Labs., Albuquerque, NM (United States); Hatcher, C.; Forehand, M. [Los Alamos National Lab., NM (United States)

1998-08-01T23:59:59.000Z

472

Conceptual design report: Neutrino physics after the Main Injector upgrade  

SciTech Connect (OSTI)

The Main Injector will provide an unprecedented opportunity for challenging the Standard Model. The increased fluxes available from this essential upgrade make possible neutrino experiments of great power both at the Tevatron and at intermediate energies. With a factor of six increase in flux, experiments at higher energies probe with great sensitivity the electroweak sector, test QCD, and search for rare processes which could point the way to new physics. Such experiments can make simultaneous measurements of the Standard Model {rho} parameter and sin{sup 2} {theta}{sub W} to 0.25% and 0.6%, respectively. Measurements of the radiative corrections in electroweak physics will reveal physics at the TeV mass scale. {rho} probes the Higgs sector, and deviations from its expected value would be unambiguous signals of new phenomena and possibly our first clear window into physics beyond the Standard Model. Another way to quantify these corrections is through measurements of sin{sup 2} {theta}{sub W} in different processes; comparisons among an ensemble of precise electroweak measurements can then distinguish among alternatives and pin down the sources of new phenomena. Four processes likely to be important in the coming decade are the direct boson mass measurements, Z polarization asymmetries, atomic parity violation, and neutrino-nucleon scattering. Each of these processes has a different dependence on the various sources of new physics: such phenomena as multiple Z's, supersymmetry, or technicolor are just three of many possibilities. Neutral current measurements of sin{sup 2} {theta}{sub W} and {rho} have already provided constraints on m{sub t}; improved measurements will extend their reach and help us interpret the information from the colliders. QCD tests, especially those involving the structure function xF{sub 3}, can check two fundamental predictions of the theory: the dependence of the strong-coupling constant {alpha}{sub S}(Q{sup 2}) on Q{sup 2}, and the value (and Q{sup 2} dependence) of R{sub QCD} = {sigma}{sub L}/{sigma}{sub T}. A Main Injector experiment will check the scaling violation of the theory and provide solid measurements of the gluon distributions.

Bernstein, R.; Beverly, L.; Browning, F.; Childress, S.; Freeman, W.; Jacobsen, V.; Koizumi, G.; Krider, J.; Kula, L.; Malensek, A.; Pordes, Stephen H.; /Fermilab /Ohio State U.

1991-01-01T23:59:59.000Z

473

The Ural Electrochemical Integrated Plant Process for Managing Equipment Intended for Nuclear Material Protection, Control and Accounting System Upgrades  

SciTech Connect (OSTI)

Since 1996, the Ural Electrochemical Integrated Plant (UEIP) located in the town of Novouralsk, Russia, (previously known as Sverdlovsk-44) and the United States Department of Energy (U.S. DOE) have been cooperating under the Nuclear Material Protection, Control and Accounting (MPC&A) Program. Because UEIP is involved in the processing of highly enriched uranium (HEU) into low enriched uranium (LEU), and there are highly enriched nuclear materials on its territory, the main goal of the MPC&A cooperation is to upgrade those systems that ensure secure storage, processing and transportation of nuclear materials at the plant. UEIP has completed key upgrades (equipment procurement and installation) aimed at improving MPC&A systems through significant investments made by both the U.S. DOE and UEIP. These joint cooperative efforts resulted in bringing MPC&A systems into compliance with current regulations, which led to nuclear material (NM) theft risk reduction and prevention from other unlawful actions with respect to them. Upon the U.S. MPC&A project team’s suggestion, UEIP has developed an equipment inventory control process to track all the property provided through the MPC&A Program. The UEIP process and system for managing equipment provides many benefits including: greater ease and efficiency in determining the quantities, location, maintenance and repair schedule for equipment; greater assurance that MPC&A equipment is in continued satisfactory operation; and improved control in the development of a site sustainability program. While emphasizing UEIP’s equipment inventory control processes, this paper will present process requirements and a methodology that may have practical and helpful applications at other sites.

Yuldashev, Rashid; Nosov, Andrei; Carroll, Michael F.; Garrett, Albert G.; Dabbs, Richard D.; Ku, Esther M.

2008-10-01T23:59:59.000Z

474

Aircraft System Identification Using Artificial Neural Networks  

E-Print Network [OSTI]

Artificial neural networks o Require minimal user input o Easily implemented o Robust to noise o Fast #12 interactions between neurons that pass electrochemical signals between each other Artificial neural networks

Valasek, John

475

Appliance Upgrades to Consider for Next Tax Season | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Appliance Upgrades to Consider for Next Tax Season Appliance Upgrades to Consider for Next Tax Season Appliance Upgrades to Consider for Next Tax Season April 15, 2013 - 2:28pm Addthis Solar energy systems are among the renewable and efficiency purchases that are eligible for tax credits. | Photo courtesy of Industrial Solar Technology Corp. Solar energy systems are among the renewable and efficiency purchases that are eligible for tax credits. | Photo courtesy of Industrial Solar Technology Corp. Erik Hyrkas Erik Hyrkas Media Relations Specialist, Office of Energy Efficiency & Renewable Energy What does this mean for me? If you missed the energy efficiency and renewable energy tax credits for 2012, you can still take advantage of them in 2013. Tax season comes to a close today, and if you missed the energy efficiency

476

Building Value with Energy-Saving Upgrades in Homes and Businesses |  

Broader source: Energy.gov (indexed) [DOE]

Building Value with Energy-Saving Upgrades in Homes and Businesses Building Value with Energy-Saving Upgrades in Homes and Businesses Building Value with Energy-Saving Upgrades in Homes and Businesses July 12, 2011 - 10:09am Addthis Eric Barendsen Energy Technology Program Specialist, Office of Energy Efficiency and Renewable Energy When I'm at a dinner party or going to a baseball game with friends, the conversation sometimes turns to what people are doing to improve their homes. As many of our readers have discovered on their own, improving the energy performance of your home can also make it more comfortable and attractive, increase its value, and help you save money on your energy bills. Remodeling a kitchen with granite countertops or stainless steel fixtures, for example, might make a home more attractive to a potential buyer. In the

477

Out With the Old, In With the New: New Hampshire Town to Upgrade Lighting |  

Broader source: Energy.gov (indexed) [DOE]

Out With the Old, In With the New: New Hampshire Town to Upgrade Out With the Old, In With the New: New Hampshire Town to Upgrade Lighting Out With the Old, In With the New: New Hampshire Town to Upgrade Lighting June 17, 2010 - 3:09pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE Newfields, New Hampshire's town hall has a lot of old-time charm worth keeping, with its steeple, rusted-red brick and chimney stacks, but the town lights are ready for a makeover. "Obviously, they don't have gas lamps from the 1800s," jokes Clay Mitchell, Newfields' town planner. "But the lights are old. In the town hall meeting room, they are awful. They are big, fat and hum when you turn them on." Now, with a $2,000 Energy Efficiency and Conservation Block Grant (EECBG) from the U.S. Department of Energy and New Hampshire Office of Energy and

478

Building Value with Energy-Saving Upgrades in Homes and Businesses |  

Broader source: Energy.gov (indexed) [DOE]

Building Value with Energy-Saving Upgrades in Homes and Businesses Building Value with Energy-Saving Upgrades in Homes and Businesses Building Value with Energy-Saving Upgrades in Homes and Businesses July 12, 2011 - 10:09am Addthis Eric Barendsen Energy Technology Program Specialist, Office of Energy Efficiency and Renewable Energy When I'm at a dinner party or going to a baseball game with friends, the conversation sometimes turns to what people are doing to improve their homes. As many of our readers have discovered on their own, improving the energy performance of your home can also make it more comfortable and attractive, increase its value, and help you save money on your energy bills. Remodeling a kitchen with granite countertops or stainless steel fixtures, for example, might make a home more attractive to a potential buyer. In the

479

NEPA CX Determination SS-SC-11-01 for SSRL Seismic Upgrade Phase 2  

Broader source: Energy.gov (indexed) [DOE]

1 for SSRL Seismic Upgrade Phase 2 1 for SSRL Seismic Upgrade Phase 2 National Environmental Policy Act (NEPA) Categorical Exclusion (CX) Determination A. SSO NEPA Control #: SS-SC-11-01 B. Brief Description of Proposed Action: The Stanford Synchrotron Radiation Lightsource (SSRL) is proposing to upgrade a portion of the existing Stanford Positron-Electron Asymmetric Ring (SPEAR) to meet seismic standards. The proposed work includes : 1) the replacement of concrete roof blocks, placement of footings and new concrete walls, and installation of seismic connections at the old Beam Line 4; 2) the replacement of existing concrete roof blocks with precast roof blocks, placement of new footings, and installation of seismic anchors and connections at the northeast section of the

480

Energy Upgrades to Save Small Arizona Town Big Money | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Upgrades to Save Small Arizona Town Big Money Upgrades to Save Small Arizona Town Big Money Energy Upgrades to Save Small Arizona Town Big Money July 19, 2010 - 1:00pm Addthis An aerial shot of Oro Valley, Ariz.'s town hall campus shows proposed solar locations. | Photo courtesy of Oro Valley An aerial shot of Oro Valley, Ariz.'s town hall campus shows proposed solar locations. | Photo courtesy of Oro Valley Temperatures above 100 degrees mean that staying cool and being energy efficient is important to the small town of Oro Valley, Ariz. But finding the funds to do both can be a challenge. It was this heat - and the availability of a federal grant - that Bayer Vella, the town's conservation and sustainability manager, cited as a reason the city is forging ahead with energy retrofits and solar projects.

Note: This page contains sample records for the topic "networks require upgrading" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4  

Broader source: Energy.gov (indexed) [DOE]

Hydropower Upgrades to Yield Added Generation at Average Costs Less Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams Hydropower Upgrades to Yield Added Generation at Average Costs Less Than 4 cents per kWh - Without New Dams November 4, 2009 - 12:00am Addthis WASHINGTON, DC - U.S. Energy Secretary Steven Chu today announced up to $30.6 million in Recovery Act funding for the selection of seven hydropower projects that modernize hydropower infrastructure by increasing efficiency and reducing environmental impacts at existing facilities. The expanded hydro generation projects have estimated incremental costs of less than 4 cents per kWh on average. The selections announced today will deploy innovative technologies such as high-efficiency, fish-friendly turbines, improved water intakes, and

482

Oak Ridge EM Program Upgrades Environmental Database for Public's Ease of  

Broader source: Energy.gov (indexed) [DOE]

Upgrades Environmental Database for Public's Upgrades Environmental Database for Public's Ease of Use Oak Ridge EM Program Upgrades Environmental Database for Public's Ease of Use October 30, 2013 - 12:00pm Addthis Oak Ridge’s environmental database contains data from more than 14 million field samples. These samples provide a clear picture of clean and contaminated areas at the site. Oak Ridge's environmental database contains data from more than 14 million field samples. These samples provide a clear picture of clean and contaminated areas at the site. OAK RIDGE, Tenn. - Oak Ridge is working to remediate contaminated areas in one of the EM program's most diverse and complex cleanup sites due to the research and production that occurred there during the Manhattan Project and Cold War. Oak Ridge employees use an array of tools to educate the public about the

483

Out With the Old, In With the New: New Hampshire Town to Upgrade Lighting |  

Broader source: Energy.gov (indexed) [DOE]

Out With the Old, In With the New: New Hampshire Town to Upgrade Out With the Old, In With the New: New Hampshire Town to Upgrade Lighting Out With the Old, In With the New: New Hampshire Town to Upgrade Lighting June 17, 2010 - 3:09pm Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE Newfields, New Hampshire's town hall has a lot of old-time charm worth keeping, with its steeple, rusted-red brick and chimney stacks, but the town lights are ready for a makeover. "Obviously, they don't have gas lamps from the 1800s," jokes Clay Mitchell, Newfields' town planner. "But the lights are old. In the town hall meeting room, they are awful. They are big, fat and hum when you turn them on." Now, with a $2,000 Energy Efficiency and Conservation Block Grant (EECBG) from the U.S. Department of Energy and New Hampshire Office of Energy and

484

Microsoft Word - CX-Big Eddy-TroutdaleUpgradeFY12_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

Erich Orth Erich Orth Project Manager - TEP-TPP-3 Proposed Action: Big Eddy - Troutdale No. 1 230 kV Transmission Line Upgrade Categorical Exclusion Applied (from Subpart D, 10 C.F.R. Part 1021): Appendix B4.13, Upgrading and Rebuilding Existing Powerlines. Location: Wasco, Hood River and Clackamas counties, OR Proposed by: Bonneville Power Administration (BPA) Description of the Proposed Action: The project, as proposed, is the thermal upgrade of the BPA Big Eddy - Troutdale No.1 230 kV Transmission Line: Background BPA's Big Eddy - Troutdale No. 1 230-kV transmission line is one of three major transmission lines that cross the Oregon Cascade Mountains. These lines transport The Dalles hydro generation and northwest wind generation output in the east to load centers west of the Cascades, like

485

Program Finds Unique Way to Fund Energy Upgrades | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Program Finds Unique Way to Fund Energy Upgrades Program Finds Unique Way to Fund Energy Upgrades Program Finds Unique Way to Fund Energy Upgrades May 4, 2010 - 11:11am Addthis Stephen Graff Former Writer & editor for Energy Empowers, EERE The $40 million of Recovery Acts funds used for weatherizing more than 6,500 homes over the next two years in Arkansas is a welcomed boost, but Martha Jane Murray of the Clinton Foundation is thinking bigger. "How do we create a more robust delivery system that is not just relying on federal dollars," asks Martha Jane, the program director for the foundation's Arkansas Clinton Climate Initiative (CCI AR). For CCI AR, one answer is the Home Energy Affordability Loan, or HEAL, program. In a unique approach to help chip away at the list of homes in need of weatherization and lower industrial energy consumption, CCI AR developed a

486

Homeowner Q&A: How I Benefitted from Energy Efficiency Upgrades |  

Broader source: Energy.gov (indexed) [DOE]

Homeowner Q&A: How I Benefitted from Energy Efficiency Upgrades Homeowner Q&A: How I Benefitted from Energy Efficiency Upgrades Homeowner Q&A: How I Benefitted from Energy Efficiency Upgrades August 14, 2013 - 4:33pm Addthis Pictured here is the knee wall in Seth Budick's daughter's room. While insulating behind the knee wall, Budick and his wife took advantage of the construction and added a built-in shelf -- an improvement that increased the room's comfort and storage. | Photo courtesy of Seth Budick. Pictured here is the knee wall in Seth Budick's daughter's room. While insulating behind the knee wall, Budick and his wife took advantage of the construction and added a built-in shelf -- an improvement that increased the room's comfort and storage. | Photo courtesy of Seth Budick. Rebecca Matulka Rebecca Matulka

487

Microsoft Word - CX-DixieSubstationUpgradesFY11_WEB.doc  

Broader source: Energy.gov (indexed) [DOE]

KEP-4 KEP-4 SUBJECT: Environmental Clearance Memorandum Brett Sherer Project Manager - KEP-4 Proposed Action: Upgrade of secondary containment facilities at Dixie Substation Budget Information: Work Order: 00004952 Categorical Exclusion Applied (Appendix B to Subpart D, 10 C.F.R. Part 1021): B4.6: Additions or modifications to electric power transmission facilities that would not affect the environment beyond the previously developed facility area including, but not limited to, switchyard rock grounding upgrades, secondary containment projects, paving projects, seismic upgrading, tower modifications, changing insulators, and replacement of poles, circuit breakers, conductors, transformers, and crossarms. Location: PLS T1S R8E S1 Dixie Substation in Elmore County, Idaho.

488

Addendum to the Technical Design Report for the Upgrade of the ALICE Time Projection Chamber  

E-Print Network [OSTI]

This is the addendum to the TDR of the upgrade of the ALICE Time Projection Chamber (CERN-LHCC-2013-020 ; ALICE-TDR-016). The key objective of the upgrade is the replacement of the present MWPC-based readout chambers by detectors that allow continuous operation without active ion gating. In the TDR, we propose a solution that employs stacks of four Gas Electron Multipliers (GEMs) and demonstrate that it fulfills the design specifications, in particular in terms of intrinsic position resolution, energy resolution, and ion backflow. In this document we demonstrate with additional results from both detector R&D and simulations that the technological solution chosen in the TDR has sufficient safety margin for a successful campaign with the upgraded detector in RUN 3 and beyond.

The ALICE Collaboration

2015-01-01T23:59:59.000Z

489

Building America Perspective and Overlay to the Energy Upgrade California Approach  

Broader source: Energy.gov (indexed) [DOE]

Perspective & Perspective & Overlay to the Energy Upgrade California Approach Driving demand through targeted neighborhood programs By Mark Berman, Alliance for Residential Building Innovation BA Residential Energy Efficiency Stakeholder Meeting - March 1, 2012 Austin, TX Relevant BAP Gaps & Barriers 1. Difficulty in recruiting homeowners to participate in home energy upgrade programs. (Recruitment) 2. Need to develop sustainable retrofit business models (Biz Models) - Review business models in Better Buildings Program & other programs 3. Data mining - need to analyze utility bills to get a sense of whole-house efficiency and savings (Aggregate Results) 2 Overview: Stockton CA

490

K.K. Gan ATLAS Tracker Upgrade Workshop 1 Nov 5, 2008  

E-Print Network [OSTI]

channel Preliminary #12;K.K. Gan ATLAS Tracker Upgrade Workshop 8 Radiation-Hardness of GaAs PIN AOC.03 AOC 5.0 0.60 0.04 Optowell 3.125 0.60 0.10 Hamamatsu G8921 2.5 0.50 0.20 Si Taiwan 1.0 0.55 0 irradiation with SLHC dose: AOC(5 & 10 G) have good power #12;K.K. Gan ATLAS Tracker Upgrade Workshop 12

Gan, K. K.

491

Mechanical and Thermal Prototype Testing for a Rotatable Collimator for the LHC Phase II Collimation Upgrade  

SciTech Connect (OSTI)

The Phase II upgrade to the LHC collimation system calls for complementing the robust Phase I graphite collimators with high Z, low impedance Phase II collimators. The design for the collimation upgrade has not been finalized. One option is to use metallic rotatable collimators and testing of this design will be discussed here. The Phase II collimators must be robust in various operating conditions and accident scenarios. A prototype collimator jaw has been tested for both mechanical and thermal compliance with the design goals. Thermal expansion bench-top tests are compared to ANSYS simulation results.

Smith, Jeffrey Claiborne; Doyle, Eric; Keller, Lewis; Lundgren, Steven; Markiewicz, Thomas Walter; /SLAC; ,

2010-08-26T23:59:59.000Z

492

Microsoft Word - NEGTN02-#214732-v2-FY_2013_NEUP_REACTOR_UPGRADE_FOA_.DOCX  

Broader source: Energy.gov (indexed) [DOE]

FINANCIAL ASSISTANCE FINANCIAL ASSISTANCE FUNDING OPPORTUNITY ANNOUNCEMENT U. S. Department of Energy Idaho Operations Office Nuclear Energy University Programs - Reactor Upgrades Funding Opportunity Number: DE-FOA-0000815 Announcement Type: Initial CFDA Number: 81.121 Issue Date: December 13, 2012 Letter of Intent Due Date: Not Applicable Pre-Application Due Date: Not Applicable Application Due Date: May 20, 2013 Nuclear Energy University Programs - Reactor Upgrades DE-FOA-0000815 i Section I - FUNDING OPPORTUNITY DESCRIPTION ............................................ 1 Section II - AWARD INFORMATION .......................................................................... 2 A. TYPE OF AWARD INSTRUMENT ....................................................................

493

Clock and timing distribution in the LHCb upgraded detector and readout system  

E-Print Network [OSTI]

The LHCb experiment is upgrading part of its detector and the entire readout system towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity and increase its trigger efficiency. In this paper, the new timing, trigger and control distribution system for such an upgrade is reviewed with particular attention given to the distribution of the clock and timing information across the entire readout system, up to the FE and the on-detector electronics. Current ideas are here presented in terms of reliability, jitter, complexity and implementation.

Alessio, F; Barros Marin, M; Cachemiche, JP; Hachon, F; Jacobsson, R; Wyllie, K

2014-01-01T23:59:59.000Z

494

LHCb : Clock and timing distribution in the LHCb upgraded detector and readout system  

E-Print Network [OSTI]

The LHCb experiment is upgrading part of its detector and the entire readout system towards a full 40 MHz readout system in order to run between five and ten times its initial design luminosity and increase its trigger efficiency. In this paper, the new timing, trigger and control distribution system for such an upgrade is reviewed with particular attention given to the distribution of the clock and timing information across the entire readout system, up to the FE and the on-detector electronics. Current ideas are here presented in terms of reliability, jitter, complexity and implementation.

Alessio, Federico; Barros Marin, M; Cachemiche, JP; Hachon, F; Jacobsson, Richard; Wyllie, Ken

2014-01-01T23:59:59.000Z

495

Negative-potential operation of TMX-Upgrade  

SciTech Connect (OSTI)

A tandem-mirror configuration can be created by combining hot electron end-cell plasmas with neutral-beam pumping. A region of large negative potential formed in each end cell confines electrons in the central cell. The requirement of charge neutrality causes the central-cell potential to become negative with respect to ground in order to equate ion loss to electron loss. Start-up and formation of the axial potential distribution, neutral-beam pumping, hot electron feed, electron-cyclotron-resonance heating (ECRH) power requirements, and stability are discussed in general terms. Each of these considerations impose constraints on the operation of TMX as a negative machine. The start-up requirements and scenario are also presented. Work on the design and analysis of n