Powered by Deep Web Technologies
Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

1999 Commercial Buildings Characteristics--Year Constructed  

U.S. Energy Information Administration (EIA) Indexed Site

Year Constructed Year Constructed Year Constructed More than one-third (37 percent) of the floorspace in commercial buildings was constructed since 1980 and more than one-half (55 percent) after 1969 (Figure 1). Less than one-third of floorspace was constructed before 1960. Detailed tables Figure 1. Distribution of Floorspace by Year Constructed, 1999 Figure 1. Distribution of Floorspace by Year Constructed, 1999. If having trouble viewing this page, please contact the National Energy Information Center at (202) 586-8800. Energy Information Administration Commercial Buildings Energy Consumption Survey Overall, relatively more buildings than floorspace were represented in the older age categories and more floorspace than buildings in the newer categories (see graphical comparison) because older buildings were smaller than more recently constructed buildings (Figure 2). Buildings constructed prior to 1960 were 11,700 square feet in size on average while those constructed after 1959 were 37 percent larger at 16,000 square feet per building.

2

Property:Building/YearConstruction2 | Open Energy Information  

Open Energy Info (EERE)

YearConstruction2 YearConstruction2 Jump to: navigation, search This is a property of type Date. Year of construction 2 (Year of construction) Pages using the property "Building/YearConstruction2" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 1921 + Sweden Building 05K0002 + 1999 + Sweden Building 05K0003 + 1960 + Sweden Building 05K0004 + 1914 + Sweden Building 05K0005 + 1940 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1900 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 1777 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1850 + Sweden Building 05K0014 + 1650 + Sweden Building 05K0015 + 1878 + Sweden Building 05K0016 + 1700 +

3

Property:Building/YearConstruction1 | Open Energy Information  

Open Energy Info (EERE)

YearConstruction1 YearConstruction1 Jump to: navigation, search This is a property of type Date. Year of construction 1 (taxation year) Subproperties This property has the following 1 subproperty: S Sweden Building 05K0004 Pages using the property "Building/YearConstruction1" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 2003 + Sweden Building 05K0002 + 27 June 2013 21:11:42 + Sweden Building 05K0003 + 27 June 2013 21:10:49 + Sweden Building 05K0005 + 27 June 2013 21:11:38 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1972 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 2004 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1992 +

4

Property:Building/YearConstruction | Open Energy Information  

Open Energy Info (EERE)

YearConstruction YearConstruction Jump to: navigation, search This is a property of type Date. Year of construction Pages using the property "Building/YearConstruction" Showing 25 pages using this property. (previous 25) (next 25) S Sweden Building 05K0001 + 2003 + Sweden Building 05K0002 + 1999 + Sweden Building 05K0003 + 1960 + Sweden Building 05K0004 + 1914 + Sweden Building 05K0005 + 1940 + Sweden Building 05K0006 + 1995 + Sweden Building 05K0007 + 1900 + Sweden Building 05K0008 + 1997 + Sweden Building 05K0009 + 1980 + Sweden Building 05K0010 + 1777 + Sweden Building 05K0011 + 1995 + Sweden Building 05K0012 + 2000 + Sweden Building 05K0013 + 1850 + Sweden Building 05K0014 + 1650 + Sweden Building 05K0015 + 1878 + Sweden Building 05K0016 + 1700 + Sweden Building 05K0017 + 1987 +

5

Buildings","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

B9. Year Constructed, Floorspace, 1999" B9. Year Constructed, Floorspace, 1999" ,"Total Floorspace (million square feet)" ,"All Buildings","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999" "All Buildings ................",67338,4034,6445,9127,10866,11840,13931,11094 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",6774,655,798,1025,928,1056,1153,1159 "5,001 to 10,000 ..............",8238,791,776,1777,1165,1392,1150,1188 "10,001 to 25,000 .............",11153,972,1504,1488,1267,2045,2767,1110 "25,001 to 50,000 .............",9311,489,673,1343,1987,1587,1594,1638

6

Table B8. Year Constructed, Number of Buildings, 1999  

U.S. Energy Information Administration (EIA) Indexed Site

B8. Year Constructed, Number of Buildings, 1999" B8. Year Constructed, Number of Buildings, 1999" ,"Number of Buildings (thousand)" ,"All Buildings","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999" "All Buildings ................",4657,419,499,763,665,774,846,690 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2348,227,270,359,321,367,413,390 "5,001 to 10,000 ..............",1110,107,102,240,166,193,156,145 "10,001 to 25,000 .............",708,63,90,97,84,130,179,65 "25,001 to 50,000 .............",257,13,20,39,53,44,43,44 "50,001 to 100,000 ............",145,7,9,19,24,26,33,27

7

Buildings*","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

B8. Year Constructed, Number of Buildings for Non-Mall Buildings, 2003" B8. Year Constructed, Number of Buildings for Non-Mall Buildings, 2003" ,"Number of Buildings (thousand)" ,"All Buildings*","Year Constructed" ,,"1919 or Before","1920 to 1945","1946 to 1959","1960 to 1969","1970 to 1979","1980 to 1989","1990 to 1999","2000 to 2003" "All Buildings* ...............",4645,330,527,562,579,731,707,876,334 "Building Floorspace" "(Square Feet)" "1,001 to 5,000 ...............",2552,174,315,331,298,350,438,481,165 "5,001 to 10,000 ..............",889,71,107,90,120,180,98,158,66 "10,001 to 25,000 .............",738,55,64,90,95,122,103,151,58 "25,001 to 50,000 .............",241,19,23,26,33,48,32,39,21

8

Comparative affinity purification of single chain antibody NC6.8  

E-Print Network (OSTI)

purification were compared: 1) anti c-myc mAb for a c-myc-scfv NC6.8 fusion construct, 2) metal chelation for a histidine hexamer-scfv NC6.8 fusion construct, and 3) polyclonal anti-scfv NC 6.8 antibody, for either of the above fusion constructs. The polyclonal...

Jackson, Michael Gary

1996-01-01T23:59:59.000Z

9

NC Sustainable Energy Association | Open Energy Information  

Open Energy Info (EERE)

NC Sustainable Energy Association NC Sustainable Energy Association Jump to: navigation, search Name NC Sustainable Energy Association Address PO Box 6465 Place Raleigh Zip 27628 Number of employees 1-10 Year founded 1978 Phone number 919-832-7601 Website http://www.energync.org Coordinates 35.7719°, -78.6388° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.7719,"lon":-78.6388,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

10

Table HC1-2a. Housing Unit Characteristics by Year of Construction,  

U.S. Energy Information Administration (EIA) Indexed Site

2a. Housing Unit Characteristics by Year of Construction, 2a. Housing Unit Characteristics by Year of Construction, Million U.S. Households, 2001 Housing Unit Characteristics RSE Column Factor: Total Year of Construction RSE Row Factors 1990 to 2001 1 1980 to 1989 1970 to 1979 1960 to 1969 1950 to 1959 1949 or Before 0.5 1.6 1.2 1.0 1.1 1.1 0.8 Total ............................................... 107.0 15.5 18.2 18.8 13.8 14.2 26.6 4.3 Census Region and Division Northeast ...................................... 20.3 1.5 2.4 2.1 2.8 3.0 8.5 8.8 New England .............................. 5.4 0.4 0.7 0.4 0.8 0.9 2.3 11.3 Middle Atlantic ............................ 14.8 1.1 1.7 1.7 2.0 2.2 6.2 11.2 Midwest ......................................... 24.5 2.8 3.7 3.6 2.9 3.5 8.1 10.2 East North Central ...................... 17.1 2.0 2.5 2.5 2.0 2.6 5.5 11.9

11

CT NC0  

Office of Legacy Management (LM)

x-L* d! x-L* d! CT NC0 - i , ,. i, .' i :.:(e.!' ,A\~, L.,t, - (iI :i' , . y- 2 .L i ._ 1 c\ :- i;! Ii $ 4. Ci:lc:i.nnati. 39, t>:::i.f> (J&l3 q-1 -3 sui3 Jrn T3 FRCM .I iirz 1 ?j ~ 1.3 bL1 T:' IP !REFOI?T TC 5YC?CZCiC~ :EWllIFl;j",tsSS L' I"JIsIc:;. .:;xli3;. iCAN !fA(=;-fL,yg-j L' sc,, E. $.iCLX:i?, -iIJ,x:q()Is. ON hL4X 24 - 25 ) 1.9tic ;i. A. Quiglel;, A.3, 3, M. ChenauEt gpxrIvB OF TP.~ The purpose of t3is trip was tc observe a proposed method for the dchy- dratim of green salt md to determine that all health and safety measures were being xrried out, SurveiU.ance of this nature provided protection against excessi3z personnel exposure, insured compliance with ICC shipping regulaticns, tion of the equ'~ and determined when adequate decontamira-

12

NC-JRA-007_LASER  

NLE Websites -- All DOE Office Websites (Extended Search)

Added to Reduce Risk: *Risk: 0 to 20 21 to 40 41-60 61 to 80 81 or greater Negligible Acceptable Moderate Substantial Intolerable NC Job Risk Assessment Bnlnt2cfn docs...

13

N.C. Solar Center | Open Energy Information  

Open Energy Info (EERE)

N.C. Solar Center N.C. Solar Center Jump to: navigation, search Name N.C. Solar Center Address NCSU, Box 7401 Place Raleigh, NC Zip 27695 Number of employees 11-50 Year founded 1988 Coordinates 35.762515267°, -78.5407447815° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":35.762515267,"lon":-78.5407447815,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

14

Category:Wilmington, NC | Open Energy Information  

Open Energy Info (EERE)

NC NC Jump to: navigation, search Go Back to PV Economics By Location Media in category "Wilmington, NC" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Wilmington NC Duke Energy Carolinas LLC.png SVFullServiceRestauran... 69 KB SVQuickServiceRestaurant Wilmington NC Duke Energy Carolinas LLC.png SVQuickServiceRestaura... 68 KB SVHospital Wilmington NC Duke Energy Carolinas LLC.png SVHospital Wilmington ... 67 KB SVLargeHotel Wilmington NC Duke Energy Carolinas LLC.png SVLargeHotel Wilmingto... 65 KB SVLargeOffice Wilmington NC Duke Energy Carolinas LLC.png SVLargeOffice Wilmingt... 68 KB SVMediumOffice Wilmington NC Duke Energy Carolinas LLC.png SVMediumOffice Wilming... 68 KB SVMidriseApartment Wilmington NC Duke Energy Carolinas LLC.png

15

Category:Greensboro, NC | Open Energy Information  

Open Energy Info (EERE)

NC NC Jump to: navigation, search Go Back to PV Economics By Location Media in category "Greensboro, NC" The following 16 files are in this category, out of 16 total. SVFullServiceRestaurant Greensboro NC Duke Energy Carolinas LLC.png SVFullServiceRestauran... 69 KB SVQuickServiceRestaurant Greensboro NC Duke Energy Carolinas LLC.png SVQuickServiceRestaura... 68 KB SVHospital Greensboro NC Duke Energy Carolinas LLC.png SVHospital Greensboro ... 67 KB SVLargeHotel Greensboro NC Duke Energy Carolinas LLC.png SVLargeHotel Greensbor... 66 KB SVLargeOffice Greensboro NC Duke Energy Carolinas LLC.png SVLargeOffice Greensbo... 68 KB SVMediumOffice Greensboro NC Duke Energy Carolinas LLC.png SVMediumOffice Greensb... 67 KB SVMidriseApartment Greensboro NC Duke Energy Carolinas LLC.png

16

NC CSC Open Science Conference  

Energy.gov (U.S. Department of Energy (DOE))

This three-day conference will bring the regional climate research community (North Central region universities, DOI agencies, and other research institutions) and stakeholders, including local, federal, and tribal resource managers and leaders, to foster productive engagement, interactions, and involvement with the North Central Climate Science Center (NC CSC). The conference will strive to identify emerging research issues and topics.

17

UNC Tomorrow: NC State Response  

E-Print Network (OSTI)

UNC Tomorrow: NC State Response Submitted by James L. Oblinger Chancellor May 1, 2008 #12;#12;Table of Engineering 47 Expanding the Industrial Extension Service 49 Entrepreneurship, Industry Clusters, and Economic Behavioral Health Institute 63 4.6 Our Environment Energy and Environment: Research and Extension 67

18

NC State Engineering A Wolfpack World  

E-Print Network (OSTI)

's Sierra Leone project includes work on a water sanitation system for a remote village. Russia Chemical of the coolest places. These programs and partnerships are just a small sampling of NC State's global reach. NC

Ning, Peng

19

I'NC.£F::.-------  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

I'NC.£F::.------- I'NC.£F::.------- u.s. DEPARTMENT OF ENERGY EERE PROJECT MANAGEMENT CENTER NEPA DETI!lUnNATION RECIPIENT:WA Dept of Commerce PROJECT TITLE: SEP ARRA· WSU Anaerobic Digester· Nutrient Recovery Technology Page 1 of3 STATE: WA funding Opportunity Announcement Number Procurement Instrument Number NEPA Cnntrol Number CID Number EEOOOO139 GF0-0000139-Q22 EE139 Based on my ",view of the informaUon concerning the proposed action, as NEPA Compliance Officer (authorized under DOE Order 4SI.IA), I have made the following determination: ex, EA, EIS APPENDIX AND NUMBER: Description: A9 Information gathering (including , but not limited to, literature surveys, inventories, audits), data analysis (including computer modeling), document preparation (such as conceptual design or feasibility studies, analytical energy supply

20

Automatic 5-axis NC toolpath generation  

E-Print Network (OSTI)

Despite over a decade of research, automatic toolpath generation has remained an elusive goal for 5-axis NC machining. This thesis describes the theoretical and practical issues associated with generating collision free ...

Balasubramaniam, Mahadevan, 1976-

2001-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Buildings*","Year Constructed"  

U.S. Energy Information Administration (EIA) Indexed Site

"Food Service ...",1654,281,138,194,"Q",227,182,327,"Q" "Health Care ...",3163,"Q",203,445,395,754,522,578,185 " Inpatient...

22

YEAR  

National Nuclear Security Administration (NNSA)

96 YEAR 2013 Males 69 Females 27 YEAR 2013 SES 1 EJEK 9 EN 04 27 NN (Engineering) 26 NQ (ProfTechAdmin) 30 NU (TechAdmin Support) 3 YEAR 2013 American Indian Alaska Native Male...

23

NOAA Climate Data Prepares Oahu Construction Industry for Wet Season Each year NOAA's Climate Prediction Center, a part of the  

E-Print Network (OSTI)

and landfill. Without the headsup, not only PVT but Oahu's entire construction industry would have been hurt, with losses in the millions of dollars. As the only construction landfill on the island, more constructed storm water retention pond at the PVT landfill in Nanakuli, Oahu, Hawai'i Road to landfill

24

NC State and Health PAC's  

E-Print Network (OSTI)

your first year at NCSU Interested in Medical School, Dental School or another Health Care Graduate science major is not required to apply to any type of health care graduate program, many of our students was designed with health care graduate programs of all types in mind. Students not only meet all the core

Langerhans, Brian

25

N.C. Agency Growing, Helping Citizens Save Money | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

N.C. Agency Growing, Helping Citizens Save Money N.C. Agency Growing, Helping Citizens Save Money N.C. Agency Growing, Helping Citizens Save Money March 12, 2010 - 5:20pm Addthis Reginald Speight, CEO of Martin County Community Action | Photo courtesy of Martin County Community Action Reginald Speight, CEO of Martin County Community Action | Photo courtesy of Martin County Community Action Joshua DeLung North Carolina will receive $132 million, or 10 times more money than in years past, for its weatherization program through the Recovery Act. Martin County Community Action is tasked with weatherizing about 1,029 units with its $7.7 million share. The agency has also surpassed its 123 units from its usual fiscal year funding. "It's been interesting ramping up like this, but we've put our agency in a position the last couple of years to be able to do more creative

26

N.C. Agency Growing, Helping Citizens Save Money | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

N.C. Agency Growing, Helping Citizens Save Money N.C. Agency Growing, Helping Citizens Save Money N.C. Agency Growing, Helping Citizens Save Money March 12, 2010 - 5:20pm Addthis Reginald Speight, CEO of Martin County Community Action | Photo courtesy of Martin County Community Action Reginald Speight, CEO of Martin County Community Action | Photo courtesy of Martin County Community Action Joshua DeLung North Carolina will receive $132 million, or 10 times more money than in years past, for its weatherization program through the Recovery Act. Martin County Community Action is tasked with weatherizing about 1,029 units with its $7.7 million share. The agency has also surpassed its 123 units from its usual fiscal year funding. "It's been interesting ramping up like this, but we've put our agency in a position the last couple of years to be able to do more creative

27

YEAR  

National Nuclear Security Administration (NNSA)

2540 YEAR 2013 Males 1677 Females 863 YEAR 2013 SES 102 EX 3 SL 1 EJEK 89 EN 05 41 EN 04 170 EN 03 18 NN (Engineering) 448 NQ (ProfTechAdmin) 1249 NU (TechAdmin Support) 76 NV...

28

Strong decays of excited baryons in Large Nc QCD  

SciTech Connect

We present the analysis of the strong decays widths of excited baryons in the framework of the 1/Nc expansion of QCD. These studies are performed up to order 1/Nc and include both positive and negative parity excited baryons.

Goity, J. L. [Physics Dept., Hampton University, Hampton, VA 23668 (United States); TJNAF, Newport News, VA 23606 (United States); Scoccola, N. N. [Lab. TANDAR, CNEA, Av.Libertador 8250, 1429 Buenos Aires (Argentina); CONICET, Rivadavia 1917, 1033 Buenos Aires (Argentina); Universidad Favaloro, Solis 453, 1078 Buenos Aires (Argentina)

2007-02-12T23:59:59.000Z

29

An advanced STEP-NC controller for intelligent machining processes  

Science Journals Connector (OSTI)

Major improvements in high speed machining technologies are not followed by suitable evolutions of the programming standard ISO 6983, also called G-code. New STEP-NC standard aims at performing high level intelligent NC programming adapted to modern ... Keywords: CNC Controller, Multiprocess manufacturing, Optimization, STEP-NC, Simulation

Matthieu Rauch; Raphael Laguionie; Jean-Yves Hascoet; Suk-Hwan Suh

2012-06-01T23:59:59.000Z

30

YEAR  

National Nuclear Security Administration (NNSA)

1 1 YEAR 2011 Males 18 Females 23 YEAR 2011 SES 2 EJ/EK 2 NQ (Prof/Tech/Admin) 35 NU (Tech/Admin Support) 2 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 9 Asian Male 0 Asian Female 0 Hispanic Male 2 Hispanic Female 6 White Male 12 White Female 6 DIVERSITY Workforce Diversity Associate Administrator for Information Management & Chief Information Officer, NA-IM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 18 43.9% 23 56.1% Gender Males Females 4.9% 4.9% 85.4% 4.9% Pay Plan SES EJ/EK NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 2.4% 4.9% 7.3% 22.0% 0.0% 0.0% 4.9% 14.6% 29.3% 14.6% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

31

YEAR  

National Nuclear Security Administration (NNSA)

4 4 YEAR 2011 Males 21 Females 23 YEAR 2011 SES 3 EJ/EK 1 EN 03 1 NN (Engineering) 3 NQ (Prof/Tech/Admin) 31 NU (Tech/Admin Support) 5 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 2 Asian Male 1 Asian Female 1 Hispanic Male 6 Hispanic Female 10 White Male 13 White Female 10 DIVERSITY Workforce Diversity Office of General Counsel, NA-GC As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 21 47.7% 23 52.3% Gender Males Females 6.8% 2.3% 2.3% 6.8% 70.5% 11.4% Pay Plan SES EJ/EK EN 03 NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.0% 0.0% 2.3% 4.5% 2.3% 2.3% 13.6% 22.7% 29.5% 22.7% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male

32

YEAR  

National Nuclear Security Administration (NNSA)

6 6 YEAR 2011 Males 7 Females 9 YEAR 2011 SES 1 NQ (Prof/Tech/Admin) 9 GS 15 2 GS 13 2 GS 12 1 GS 11 1 YEAR 2011 American Indian Male 0 American Indian Female 0 African American Male 1 African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 4 White Female 6 DIVERSITY Workforce Diversity Associate Administrator of External Affairs, NA-EA As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 7 43.8% 9 56.3% Gender Males Females 6.3% 56.3% 12.5% 12.5% 6.3% 6.3% Pay Plan SES NQ (Prof/Tech/Admin) GS 15 GS 13 GS 12 GS 11 0.0% 0.0% 6.3% 18.8% 6.3% 0.0% 6.3% 0.0% 25.0% 37.5% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male Asian Female Hispanic Male Hispanic Female White Male White Female FY11 Workforce Diversity

33

YEAR  

National Nuclear Security Administration (NNSA)

40 40 YEAR 2011 Males 68 Females 72 YEAR 2011 SES 5 EJ/EK 1 NN (Engineering) 16 NQ (Prof/Tech/Admin) 115 NU (Tech/Admin Support) 3 YEAR 2011 American Indian Male 1 American Indian Female 2 African American Male 3 African American Female 7 Asian Male 4 Asian Female 0 Hispanic Male 25 Hispanic Female 26 White Male 35 White Female 37 DIVERSITY Workforce Diversity Associate Administrator for Acquistion & Project Management, NA-APM As of Sep 24, 2011 PAY PLAN TOTAL WORKFORCE GENDER 68 48.6% 72 51.4% Gender Males Females 3.6% 0.7% 11.4% 82.1% 2.1% Pay Plan SES EJ/EK NN (Engineering) NQ (Prof/Tech/Admin) NU (Tech/Admin Support) 0.7% 1.4% 2.1% 5.0% 2.9% 0.0% 17.9% 18.6% 25.0% 26.4% Race and Gender American Indian Male American Indian Female African American Male African American Female Asian Male

34

Years  

NLE Websites -- All DOE Office Websites (Extended Search)

and Technology in and Technology in the National Interest 60 Years of Excellence Lawrence Livermore National Laboratory FY 2012 Annual Report About the Cover: Lawrence Livermore National Laboratory (LLNL) engineers Chris Spadaccini (left) and Eric Duoss are shown experimenting with direct ink-writing to create micro- to macroscale structures with extreme precision. The Laboratory is advancing this process and other additive manufacturing technologies to develop new materials with extraordinary properties for use in a wide range of national-security and other applications. About the Laboratory: Lawrence Livermore National Laboratory was founded in 1952 to enhance the security of the United States by advancing nuclear weapons science and technology. With a talented and dedicated workforce and

35

NC GreenPower Production Incentive | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NC GreenPower Production Incentive NC GreenPower Production Incentive NC GreenPower Production Incentive < Back Eligibility Agricultural Commercial Industrial Institutional Local Government Nonprofit Residential Schools State Government Savings Category Bioenergy Water Buying & Making Electricity Solar Wind Program Info State North Carolina Program Type Performance-Based Incentive Rebate Amount Varies by technology and system size PV up to 5 kW: $0.06/kWh PV larger than 5 kW: must enter bid process Wind up to 10 kW: $0.09/kWh Wind larger than 10 kW: must enter bid process Provider NC GreenPower NC GreenPower, a statewide green power program designed to encourage the use of renewable energy in North Carolina, offers production payments for grid-tied electricity generated by solar, wind, small hydro (10 megawatts

36

INGEN: A COBRA-NC input generator user's manual  

SciTech Connect

The INGEN (INput GENerator) computer program has been developed as a preprocessor to simplify input generation for the COBRA-NC computer program. INGEN uses several empirical correlations and geometric assumptions to simplify the data input requirements for the COBRA-NC computer code. The simplified input scheme is obtained at the expense of much flexibility provided by COBRA-NC. For more complex problems requiring additional flexibility however, INGEN may be used to provide a skeletal input file to which the more detailed input may be added. This report describes the input requirements for INGEN and describes the algorithms and correlations used to generate the COBRA-NC input. 9 refs., 3 figs., 6 tabs.

Wheeler, C.L.; Dodge, R.E.

1986-12-01T23:59:59.000Z

37

NC-JRA-004_Compressed_Gas_Work  

NLE Websites -- All DOE Office Websites (Extended Search)

to highly toxic gases Vented cabinets used for highly toxic gases, dedicated storage bunker Y 1 2 5 2 20 NC Job Risk Assessment Bnlnt2cfn docsESSH&QJRAs - FRAs2011...

38

precision deburring using NC and robot equipment. Final report  

SciTech Connect

Deburring precision miniature components is often time consuming and inconsistent. Although robots are available for deburring parts, they are not precise enough for precision miniature parts. Numerical control (NC) machining can provide edge break consistencies to meet requirements such as 76.2-..mu..m maximum edge break (chamfer). Although NC machining has a number of technical limitations which prohibits its use on many geometries, it can be an effective approach to features that are particularly difficult to deburr.

Gillespie, L.K.

1980-05-01T23:59:59.000Z

39

NC-1-B Wholesale Power Rate Schedule | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule NC-1-B Wholesale Power Rate Schedule Area: Virginia Power/CP&L System: Kerr-Philpott This rate schedule shall be available to public bodies and cooperatives (any one of whom is hereinafter called the Customer) in Virginia and North Carolina to whom power may be transmitted pursuant to a contract between the Government and Virginia Electric and Power Company (hereinafter called the Virginia Power) and PJM Interconnection LLC (hereinafter called PJM), scheduled pursuant to a contract between the Government and Carolina Power & Light Company (hereinafter called CP&L), and billed pursuant to contracts between the Government and the Customer. This rate schedule shall be applicable to the sale at wholesale of power

40

Non-global logarithms at finite Nc beyond leading order  

E-Print Network (OSTI)

We analytically compute non-global logarithms at finite Nc fully up to 4 loops and partially at 5 loops, for the hemisphere mass distribution in e+e- to di-jets to leading logarithmic accuracy. Our method of calculation relies solely on integrating the eikonal squared-amplitudes for the emission of soft energy-ordered real-virtual gluons over the appropriate phase space. We show that the series of non-global logarithms in the said distribution exhibits a pattern of exponentiation thus confirming - by means of brute force - previous findings. In the large-Nc limit, our results coincide with those recently reported in literature. A comparison of our proposed exponential form with all-orders numerical solutions is performed and the phenomenological impact of the finite-Nc corrections is discussed.

Khelifa-Kerfa, Kamel

2015-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Fiscal Year 2008 Phased Construction Completion Report for EU Z2-33 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect

The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2161&D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2224&D3) (Zone 2 RDR/RAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone 1 exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program and remedial actions (RAs) were completed for EU Z2-33. Remedial action was also performed at two additional areas in adjacent EU Z2-42 because of their close proximity and similar nature to a small surface soil RA in EU Z2-33. Remedial actions for building slabs performed in EU Z2-33 during fiscal year (FY) 2007 were reported in the Fiscal Year 2007 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2723&D1). Recommended RAs for EU Z2-42 were described in the Fiscal Year 2006 Phased Construction Completion Report for the Zone 2 Soils, Slabs, and Subsurface Structures at East Tennessee Technology Park, Oak Ridge, Tennessee (DOE/OR/01-2317&D2). Remedial actions performed in the Balance of Site (BOS) Laboratory Area of EU Z2-33 and two small areas in EU Z2-42 are described in Sects. 5 through 10 of this Phased Construction Completion Report (PCCR). The purpose of this PCCR is to address the following: (1) Document DVS characterization results for EU Z2-33; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs; (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results; and (4) Describe RAs performed in the EU Z2-33 BOS Laboratory Area and two small areas in EU Z2-42. Approximately 18 acres in EU Z2-33 are addressed in this PCCR. Based on the results of the DVS evaluation and RAs performed, all 18 acres are recommended for unrestricted industrial use to 10 ft bgs. Three Federal Facility Agreement sites are addressed and recommended for no further action within this acreage, including: (1) K-1004-L Recirculating Cooling Water Lines Leak Sites; (2) K-1044 Heavy Equipment Repair Shop; and (3) K-1015-A Laundry Pit. Remedial actions for EU Z2-33 were developed in response to DVS characterization results described in the EU Z2-33 Technical Memorandum (Appendix A) and to support reindustrialization of the East Tennessee Technology Park as a commercial industrial park. Remediation criteria were designed for the protection of a future industrial worker who normally would not have the potential for exposure to soil below 10ft bgs. Accordingly, the Zone 2 ROD required land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likel

Bechtel Jacobs

2008-09-11T23:59:59.000Z

42

Kh trng khn cp nc ung Trong nhng thi k ri ren, cc s y t a phng c th khuyn co ngi dn dng nc thn  

E-Print Network (OSTI)

nc cho gia ình bn, bn vn có th tìm c s lng gii hn dùng bng cách ly nc ra t bình nc nóng, hay là tan nc ni ó. Thuc kh trùng ít hiu nghim nu nc c. Cn phi lc nc c qua nhng khn sch hoc yên cho lng xung, và không b r sét. Có hai phng pháp kh trùng thông dng và hiu qu nu lng nc ít. Phng pháp th nht là Ðun

43

invites you to the NC State Forensic Science Symposium  

E-Print Network (OSTI)

invites you to the 5th NC State Forensic Science Symposium December 4, 2012 Convocation Room, College of Textiles Information and Registration: www.fsi.ncsu.edu Send questions to: forensics@ncsu.edu Agenda 8:00 Registration 9:00 Welcome David Hinks Director, Forensic Sciences Institute North Carolina

Liu, Paul

44

Fiscal Year 2009 Phased Construction Completion Report for EU Z2-36 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect

The purpose of this Phased Construction Completion Report (PCCR) is to present fiscal year (FY) 2009 results of Dynamic Verification Strategy (DVS) characterization activities for exposure unit (EU) Z2-36 in Zone 2 at the East Tennessee technology Park (ETTP). The ETTP is located in the northwest corner of the US Department of Energy (DOE) Oak Ridge Reservation in Oak Ridge, Tennessee and encompasses approximately 5000 acres that have been subdivided into three zones--Zone 1 ({approx} 1400 acres), Zone 2 ({approx} 800 acres), and the Boundary Area ({approx} 2800 acres). Zone 2 comprises the highly industrial portion of ETTP and consists of all formerly secured areas of the facility, including the large processing buildings and direct support facilities; experimental laboratories and chemical and materials handling facilities; materials storage and waste disposal facilities; secure document records libraries; and shipping and receiving warehouses. The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005) (Zone 2 ROD) specifies the future end use for Zone 2 acreage as uncontrolled industrial for the upper 10 ft of soils. Characterization activities in these areas were conducted in compliance with the Zone 2 ROD and the DVS and data quality objectives (DQOs) presented in the Main Plant Group DQO Scoping Package (July 2006) and the Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2007a) (Zone 2 RDR/RAWP). The purpose of this PCCR is to address the following: (1) Document EU Z2-36 DVS characterization results; (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs, and (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results. The Zone 2 ROD divided the area into 7 geographic areas and 44 EUs. To facilitate DQOs of the DVS process, the Zone 2 RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DqO process by placing similar facilities and their support facilities together and allowing identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed, and characterization was conducted as EUs became accessible. As the opportunity to complete characterization became available, the planned DVS program was completed in FY 2009 for EU Z2-36.

Bechtel Jacobs

2009-02-10T23:59:59.000Z

45

An intelligent NC program processor for CNC system of machine tool  

E-Print Network (OSTI)

NC Program Processor for CNC System of Machine Tool Yadongof the most important tasks of CNC in machine tool system.The existing CNC systems only support vendor-specific NC

Liu, Y; Guo, X; Li, W; Yamazaki, K; Kashihara, K; Fujishima, M

2007-01-01T23:59:59.000Z

46

STEP-NC enabled on-line inspection in support of closed-loop machining  

Science Journals Connector (OSTI)

The object-oriented STEP-NC data model provides a seamless and integrated programming interface for on-machine (or also known as on-line or in-line) inspections as well as interoperable manufacturing. This paper proposes a STEP-NC data model for on-line ... Keywords: Closed-loop machining, Machining, On-machine inspection, STEP-NC

Fiona Zhao; Xun Xu; Shane Xie

2008-04-01T23:59:59.000Z

47

NCSU Box 7401 Raleigh, NC 27695 (919) 515-3480 Toll Free 1-800-33-NC SUN Passive Solar Options  

E-Print Network (OSTI)

the solar elements. · If you've picked a passive solar house plan, is it designed for North Carolina1 NCSU · Box 7401 · Raleigh, NC 27695 · (919) 515-3480 · Toll Free 1-800-33-NC SUN Passive Solar, you may be considering passive solar design. A passive solar home has four features that distinguish

48

Constructive physics  

E-Print Network (OSTI)

Discussion of the necessity to use the constructive mathematics as the formalism of quantum theory for systems with many particles.

Yuri Ozhigov

2008-05-19T23:59:59.000Z

49

New Construction  

NLE Websites -- All DOE Office Websites (Extended Search)

Showerheads Residential Weatherization Performance Tested Comfort Systems Ductless Heat Pumps New Construction Residential Marketing Toolkit Retail Sales Allocation Tool...

50

Environmental Assessment for the Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

4 4 Environmental Assessment Proposed Upgrade and Operation of the CEBAF and FEL Accelerators and Construction and Use of Buildings Associated with the 2005 Ten-Year Site Plan at the Thomas Jefferson National Accelerator Facility Newport News, Virginia January 2007 U. S. Department of Energy Thomas Jefferson Site Office Newport News, VA DOE/EA-1534 January 2007 C:\TRANSFER\JANUARY 26 Final EA-1534-012607 (2).doc i TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................... 1 1.0 INTRODUCTION ...........................................................................................11 1.1 PREVIOUS ACTIONS....................................................................................11 1.2 SCOPE OF THIS PROPOSED ACTION .......................................................11

51

Baryons and Low-Density Baryonic Matter in 1+1 Dimensional Large N_c QCD with Heavy Quarks  

E-Print Network (OSTI)

This paper studies baryons and baryonic matter in the combined large N_c and heavy quark mass limits of QCD in 1+1 dimension. In this non-relativistic limit, baryons are composed of N_c quarks that interact, at leading order in N_c, through a color Coulomb potential. Using variational techniques, very accurate calculations of single baryon masses and interaction energies of low-density baryon crystal are performed. These results are used to cross-check a general numerical approach applicable for arbitrary quark masses and baryon densities recently proposed by Bringoltz, which is based on a lattice in a finite box with periodic boundary conditions. The Bringoltz method differs from a previous approach of Salcedo, et al. in its treatment of a finite box effect - namely gauge configurations that wind around the box. One might expect these effects to be small for large enough boxes, in which the baryon density approaches zero to high accuracy at the edges. However, the effects of these windings appear to be quite large even in such boxes. The large mass infinite volume calculations performed here are consistent with the results of numerical calculations using the Bringoltz method. The calculation of the baryon crystal interaction energy requires the assumption that at low-densities the ground state is composed of individual baryons, each in a color-singlet state and orthogonal to each other. This assumption is plausible but ad hoc in that one can construct configurations in which the entire state is color-singlet but cannot be broken into individual color-singlet baryons. The interaction energy of low-density baryon crystals calculated with the assumption is consistent with numerical results based on Bringoltz's approach suggesting that the assumption is justified. This further supports a similar assumption that was made in 3+1 dimensions, where no alternative means of calculation exist.

Prabal Adhikari; Thomas D. Cohen; Arec Jamgochian; Nilay Kumar

2012-12-10T23:59:59.000Z

52

Fiscal Year 2010 Phased Construction Completion Report for EU Z2-32 in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee  

SciTech Connect

The Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee (DOEIORJO 1-2161 &D2) (Zone 2 ROD) acknowledged that most of the 800 acres in Zone 2 were contaminated, but that sufficient data to confirm the levels of contamination were lacking. The Zone 2 ROD further specified that a sampling strategy for filling the data gaps would be developed. The Remedial Design Report/Remedial Action Work Plan for Zone 2 Soils, Slabs, and Subsurface Structures, East Tennessee Technology Park, Oak Ridge, Tennessee (DOEIORIO 1 -2224&D3) (RDRJRAWP) defined the sampling strategy as the Dynamic Verification Strategy (DVS), generally following the approach used for characterization of the Zone I exposure units (EUs). The Zone 2 ROD divided the Zone 2 area into seven geographic areas and 44 EUs. To facilitate the data quality objectives (DQOs) of the DVS process, the RDR/RAWP regrouped the 44 EUs into 12 DQO scoping EU groups. These groups facilitated the DQO process by placing similar facilities and their support facilities together, which allowed identification of data gaps. The EU groups were no longer pertinent after DQO planning was completed and characterization was conducted as areas became accessible. As the opportunity to complete characterization became available, the planned DVS program was completed for the EU addressed in this document (EU Z2-32). The purpose of this Phased Construction Completion Report (PCCR) is to address the following: (1) Document DVS characterization results for EU Z2-32. (2) Describe and document the risk evaluation and determine if the EU meets the Zone 2 ROD requirements for unrestricted industrial use to 10 ft bgs. (3) Identify additional areas not defined in the Zone 2 ROD that require remediation based on the DVS evaluation results. (4) Describe the remedial action performed in the K-1066-G Yard in EU Z2-32. Approximately 18.4 acres are included in the EU addressed in this PCCR. Based on results of the DVS evaluation, all 18.4 acres are recommended for unrestricted industrial use to 10 ft bgs. There are no Federal Facility Agreement Sites included in Appendix A of the Zone 2 ROD in EU Z2-32. The Zone 2 ROD requires land use controls to prevent disturbance of soils below 10 ft deep and to restrict future land use to industrial/commercial activities. In response to stakeholder comments, the U.S. Department of Energy agreed to re-evaluate the need for such land use restrictions. This document includes a screening evaluation to determine the likelihood of land use controls in EU Z2-32 being modified to: (1) eliminate the restriction on disturbance of soils below 10 ft bgs where data indicate the absence of residual contamination at any depth that would result in an unacceptable risk to the future industrial worker, and (2) permit alternative land uses that would be protective of future site occupants. Results of this screening evaluation indicate a high probability that restrictions on disturbing soil below 10 ft bgs could be safely eliminated for EU Z2-32. A qualitative screening evaluation considered the likelihood of unrestricted land use being protective of future site occupants. Based on this qualitative assessment, all 18.4 acres addressed in this PCCR were assigned a high probability for consideration of release for unrestricted land use. This document contains the main text (Sects. 1 through 13) and one appendix. The main text addresses the purpose for this PCCR as described above. Additional supporting detail (e.g., field work and data summaries, graphics) is provided in the EU Z2-32 technical memorandum (Appendix A). Historical and DVS analytical data used in this PCCR are provided on a compact disc accompanying this document and can be accessed through the Oak Ridge Environmental Information System.

Bechtel Jacobs

2010-02-01T23:59:59.000Z

53

American Solar Energy Society Proc. ASES Annual Conference, Raleigh, NC, EVALUATION OF NUMERICAL WEATHER PREDICTION  

E-Print Network (OSTI)

© American Solar Energy Society ­ Proc. ASES Annual Conference, Raleigh, NC, EVALUATION;© American Solar Energy Society ­ Proc. ASES Annual Conference, Raleigh, NC, irradiance forecasts over OF NUMERICAL WEATHER PREDICTION SOLAR IRRADIANCE FORECASTS IN THE US Richard Perez ASRC, Albany, NY, Perez

Perez, Richard R.

54

Photo-production of Positive Parity Excited Baryons in the 1/Nc Expansion of QCD  

E-Print Network (OSTI)

We analyze the photo-production helicity amplitudes for the positive parity excited baryons in the context of the $1/N_c$ expansion of QCD. The results show that sub-leading corrections in $1/N_c$ are important and that, while 1-body effective operators are dominant, there is some evidence for the need of 2-body effects.

Jose L. Goity Norberto N. Scoccola

2007-01-29T23:59:59.000Z

55

Construction Machinery  

Science Journals Connector (OSTI)

...Even today many people employed in construction associate the use of robots with the manufacturing industry, mainly the automotive ... , where they are typically employed to spray paint and spot weld the car b...

Eugeniusz Budny Prof.; Miros?aw Ch?osta Dr.

2009-01-01T23:59:59.000Z

56

Environmental effects on electron spin relaxation in N@C60  

E-Print Network (OSTI)

We examine environmental effects of surrounding nuclear spins on the electron spin relaxation of the N@C60 molecule (which consists of a nitrogen atom at the centre of a fullerene cage). Using dilute solutions of N@C60 in regular and deuterated toluene, we observe and model the effect of translational diffusion of nuclear spins of the solvent molecules on the N@C60 electron spin relaxation times. We also study spin relaxation in frozen solutions of N@C60 in CS2, to which small quantities of a glassing agent, S2Cl2 are added. At low temperatures, spin relaxation is caused by spectral diffusion of surrounding nuclear (35,37)Cl spins in the S2Cl2, but nevertheless, at 20 K, T2 times as long as 0.23 ms are observed

Morton, J J L; Ardavan, A; Porfyrakis, K; Lyon, S A; Briggs, G A D; Morton, John J. L.; Tyryshkin, Alexei M.; Ardavan, Arzhang; Porfyrakis, Kyriakos

2006-01-01T23:59:59.000Z

57

Oligomerization-dependent Regulation of Motility and Morphogenesis by the Collagen XVIII NC1/Endostatin Domain  

E-Print Network (OSTI)

Collagen XVIII (c18) is a triple helical endothelial/epithelial basement membrane protein whose noncollagenous (NC)1 region trimerizes a COOH-terminal endostatin (ES) domain conserved in vertebrates, Caenorhabditis elegans and Drosophila. Here...

Kuo, Calvin J.; LaMontagne, Kenneth R.; Garcia-Cardeñ a, Guillermo; Ackley, Brian D.; Kalman, Daniel; Park, Susan; Christofferson, Rolf; Kamihara, Junne; Ding, Yuan-Hua; Lo, Kin-Ming; Gillies, Stephen; Folkman, Judah; Mulligan, Richard C.; Javaherian, Kashi

2001-03-19T23:59:59.000Z

58

Development of an NC equipment level controller in a hierarchical shop floor control system  

E-Print Network (OSTI)

The methodology of developing an NC equipment controller in a Computer Integrated Manufacturing (CIM) System, which is based on a philosophy of hierarchical shop floor control, is presented in this research. The underlying architecture consists...

Chang, William

2012-06-07T23:59:59.000Z

59

Environmental effects on electron spin relaxation in N@C60  

E-Print Network (OSTI)

We examine environmental effects of surrounding nuclear spins on the electron spin relaxation of the N@C60 molecule (which consists of a nitrogen atom at the centre of a fullerene cage). Using dilute solutions of N@C60 in regular and deuterated toluene, we observe and model the effect of translational diffusion of nuclear spins of the solvent molecules on the N@C60 electron spin relaxation times. We also study spin relaxation in frozen solutions of N@C60 in CS2, to which small quantities of a glassing agent, S2Cl2 are added. At low temperatures, spin relaxation is caused by spectral diffusion of surrounding nuclear 35Cl and 37Cl spins in the S2Cl2, but nevertheless, at 20 K, T2 times as long as 0.23 ms are observed.

John J. L. Morton; Alexei M. Tyryshkin; Arzhang Ardavan; Kyriakos Porfyrakis; S. A. Lyon; G. Andrew D. Briggs

2006-11-09T23:59:59.000Z

60

Preliminary Estimates of Specific Discharge and TransportVelocities near Borehole NC-EWDP-24PB  

SciTech Connect

This report summarizes fluid electrical conductivity (FEC)and thermal logging data collected in Borehole NC-EWDP-24PB, locatedapproximately 15 km south of the proposed repository at Yucca Mountain.Preliminary analyses of a small fraction of the FEC and temperature dataindicate that relatively large, localized fluid fluxes are likely toexist at this location. The implication that considerable flow is inducedby small gradients, and that flow is highly localized, is significant forthe estimation of groundwater transport velocities and radionuclidetravel times. The sensitivity of the data to potential perturbationsduring testing (i.e., internal wellbore flow in the case of FEC data, andbuoyancy effects in the case of thermal logging data) make it difficultto conclusively derive fluid fluxes and transport velocities without adetailed analysis of all data and processes involved. Such acomprehensive analysis has not yet been performed. However, thepreliminary results suggest that the ambient component of the estimatedflow rates is significant and on the order of liters per minute, yieldinggroundwater transport velocities in the range of kilometers per year. Oneparticular zone in the Bullfrog tuff exhibits estimated velocities on theorder of 10 km/yr. Given that the preliminary estimates of ambient flowrates and transport velocities are relatively high, and considering thepotential impact of high rates and velocities on saturated-zone flow andtransport behavior, we recommend that a comprehensive analysis of all theavailable data be performed. Moreover, additional data sets at otherlocations should be collected to examine whether the current data set isrepresentative of the regional flow system near YuccaMountain.

Freifeld, Barry; Doughty, Christine; Finsterle, Stefan

2006-06-21T23:59:59.000Z

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

The baryon vector current in the combined chiral and 1/Nc expansions  

E-Print Network (OSTI)

The baryon vector current is computed at one-loop order in large-Nc baryon chiral perturbation theory, where Nc is the number of colors. Loop graphs with octet and decuplet intermediate states are systematically incorporated into the analysis and the effects of the decuplet-octet mass difference and SU(3) flavor symmetry breaking are accounted for. There are large-Nc cancellations between different one-loop graphs as a consequence of the large-Nc spin-flavor symmetry of QCD baryons. The results are compared against the available experimental data through several fits in order to extract information about the unknown parameters. The large-Nc baryon chiral perturbation theory predictions are in very good agreement both with the expectations from the 1/Nc expansion and with the experimental data. The effect of SU(3) flavor symmetry breaking for the |Delta S|=1 vector current form factors f1(0) results in a reduction by a few percent with respect to the corresponding SU(3) symmetric values.

Ruben Flores-Mendieta; Jose L. Goity

2014-07-03T23:59:59.000Z

62

The baryon vector current in the combined chiral and 1/Nc expansions  

E-Print Network (OSTI)

The baryon vector current is computed at one-loop order in large-Nc baryon chiral perturbation theory, where Nc is the number of colors. Loop graphs with octet and decuplet intermediate states are systematically incorporated into the analysis and the effects of the decuplet-octet mass difference and SU(3) flavor symmetry breaking are accounted for. There are large-Nc cancellations between different one-loop graphs as a consequence of the large-Nc spin-flavor symmetry of QCD baryons. The results are compared against the available experimental data through several fits in order to extract information about the unknown parameters. The large-Nc baryon chiral perturbation theory predictions are in very good agreement both with the expectations from the 1/Nc expansion and with the experimental data. The effect of SU(3) flavor symmetry breaking for the |Delta S|=1 vector current form factors f1(0) results in a reduction by a few percent with respect to the corresponding SU(3) symmetric values.

Flores-Mendieta, Ruben

2014-01-01T23:59:59.000Z

63

Are There Tetraquarks at Large $N_c$ in QCD(F)?  

E-Print Network (OSTI)

Weinberg recently pointed out a flaw in the standard argument that large $N_c$ QCD with color-fundamental quarks [QCD(F)] cannot yield narrow tetraquark states. In particular, he observed that the argument does not rule out narrow tetraquarks associated with the leading-order connected diagrams; such tetraquarks would have a width scaling as $N_c^{-1}$. It is shown here, however, that while the standard analysis of tetraquarks does not rule them out, a more thorough analysis rules out quantum-number exotic tetraquarks associated with the leading-order connected diagrams. This analysis is based entirely on conventional assumptions used in large $N_c$ physics applied to the analytic properties of meson-meson scattering. Our result implies that one of three possibilities must be true: i) quantum-number exotic tetraquarks do not exist at large $N_c$; ii) quantum-number exotic tetraquarks exist, but are associated with subleading connected diagrams and have anomalously small widths that scale as $N_c^{-2}$ or smaller; or iii) the conventional assumptions used in large $N_c$ analysis are inadequate.

Thomas D. Cohen; Richard F. Lebed

2014-03-31T23:59:59.000Z

64

The baryon vector current in the combined chiral and 1/Nc expansions  

SciTech Connect

The baryon vector current is computed at one-loop order in large-Nc baryon chiral perturbation theory, where Nc is the number of colors. Loop graphs with octet and decuplet intermediate states are systematically incorporated into the analysis and the effects of the decuplet-octet mass difference and SU(3) flavor symmetry breaking are accounted for. There are large-Nc cancellations between different one-loop graphs as a consequence of the large-Nc spin-flavor symmetry of QCD baryons. The results are compared against the available experimental data through several fits in order to extract information about the unknown parameters. The large-Nc baryon chiral perturbation theory predictions are in very good agreement both with the expectations from the 1/Nc expansion and with the experimental data. The effect of SU(3) flavor symmetry breaking for the |Delta S|=1 vector current form factors f1(0) results in a reduction by a few percent with respect to the corresponding SU(3) symmetric values.

Flores-Mendieta, Ruben; Goity, Jose L [JLAB

2014-12-01T23:59:59.000Z

65

Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Sites at Slick Rock, Colorado: Appendix B to Attachment 3, Lithologic logs and monitor well construction information. Final report  

SciTech Connect

This volume contains lithology logs and monitor well construction information for: NC processing site; UC processing site; and Burro Canyon disposal site. This information pertains to the ground water hydrology investigations which is attachment 3 of this series of reports.

NONE

1995-09-01T23:59:59.000Z

66

North Carolina State University, Campus Box 7409, Raleigh, NC 27695 | 919-515-3480 | www.nccleantech.ncsu.edu | 8/2013 Formerly the NC Solar Center  

E-Print Network (OSTI)

a mobile phone with NearBio, www.nearbio.com · Locate alternative fuels with the Alternative Fuels Data Center, www.afdc.energy.gov This factsheet supported in part through the Clean Fuel Advanced Technology.nccleantech.ncsu.edu | 8/2013 Formerly the NC Solar Center BIODIESEL RETAIL STATIONS IN NORTH CAROLINA Clean Transportation

67

Are There Tetraquarks at Large $N_c$ in QCD(F)?  

E-Print Network (OSTI)

Weinberg recently pointed out a flaw in the standard argument that large $N_c$ QCD with color-fundamental quarks [QCD(F)] cannot yield narrow tetraquark states. In particular, he observed that the argument does not rule out narrow tetraquarks associated with the leading-order connected diagrams; such tetraquarks would have a width scaling as $N_c^{-1}$. It is shown here, however, that while the standard analysis of tetraquarks does not rule them out, a more thorough analysis rules out quantum-number exotic tetraquarks associated with the leading-order connected diagrams. This analysis is based entirely on conventional assumptions used in large $N_c$ physics applied to the analytic properties of meson-meson scattering. Our result implies that one of three possibilities must be true: i) quantum-number exotic tetraquarks do not exist at large $N_c$; ii) quantum-number exotic tetraquarks exist, but are associated with subleading connected diagrams and have anomalously small widths that scale as $N_c^{-2}$ or smal...

Cohen, Thomas D

2014-01-01T23:59:59.000Z

68

North Carolina School of Science and Mathematics from Durham, NC and  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

North Carolina School of Science and Mathematics from Durham, NC North Carolina School of Science and Mathematics from Durham, NC and Albuquerque Academy from Albuquerque, NM Win the U.S. Department of Energy National Science Bowl North Carolina School of Science and Mathematics from Durham, NC and Albuquerque Academy from Albuquerque, NM Win the U.S. Department of Energy National Science Bowl May 3, 2010 - 12:00am Addthis WASHINGTON, D.C. - A high school team from Durham and a middle school team from Albuquerque won the 2010 U.S. Department of Energy (DOE) National Science Bowl today at the National Building Museum in Washington. North Carolina School of Science and Mathematics beat Mira Loma High School from Sacramento CA in the high school national championship match by correctly answering a chemistry question. Albuquerque Academy beat Gale

69

1Construction Engineering Building Emphasis  

E-Print Network (OSTI)

1Construction Engineering Building Emphasis 2013-2014 Catalog 125 Total Credits First Year Semester 1 Semester 2 R Engr 101 (Engr Orientation) 2 CE 170 (Engineering Graphics) 3 CE 160 (Engr Problems Credits First Year Semester 1 Semester 2 R Engr 101 (Engr Orientation) 2 CE 170 (Engineering Graphics) 3

Lin, Zhiqun

70

Clean Transportation | Campus Box 7409, Raleigh, NC 27695 | 919-513-7831 | www.cleantransportation.org North Carolina State University, Campus Box 7409, Raleigh, NC 27695 | 919-513-7831 | www.cleantransportation.org 8/7/12  

E-Print Network (OSTI)

through sub- Advancing Clean Energy for a Sustainable Economy Clean Fuel Advanced Technology (CFAT) 2010Clean Transportation | Campus Box 7409, Raleigh, NC 27695 | 919-513-7831 | www.cleantransportation.org 8/7/12 Clean Fuel Advanced Technology (CFAT) Project 2006-20012: Administered by the NC Solar Center

71

Clean Transportation | Campus Box 7409, Raleigh, NC 27695 | 919-513-7831 | www.cleantransportation.org North Carolina State University, Campus Box 7409, Raleigh, NC 27695 | 919-513-7831 | www.cleantransportation.org 9/17/12  

E-Print Network (OSTI)

in an liquefied petroleum gas (LPG) sub-award with the Iredell Advancing Clean Energy for a Sustainable EconomyClean Transportation | Campus Box 7409, Raleigh, NC 27695 | 919-513-7831 | www.cleantransportation.org 9/17/12 Clean Fuel Advanced Technology (CFAT) Project 2006-20012: Administered by the NC Solar

72

The effect of host Chlorella NC64A carbon : phosphorus ratio on the production of Paramecium bursaria Chlorella  

E-Print Network (OSTI)

The effect of host Chlorella NC64A carbon : phosphorus ratio on the production of Paramecium bursaria Chlorella Virus-1 JESSICA L. CLASEN AND JAMES J. ELSER School of Life Sciences, Arizona State University, Tempe, AZ, U.S.A. SUMMARY 1. We used the freshwater alga Chlorella NC64A (Division Chlorophyta

Arizona State University

73

Produced by the NC State Department of Computer Science www.csc.ncsu.edu Fall 2011 Issue  

E-Print Network (OSTI)

and Academic Leaders 2 Predicting the Effects of Climate ChangeImpact Bytes NC State To Create Video Game this Issue Predicting the Effects of Climate Change NC State to Develop Game to Boost Science Lieracy Virtual over the past decade. Droves of companies have relocat- ed, expanded or started up in the area

Young, R. Michael

74

American Solar Energy Society Proc. ASES Annual Conference, Raleigh, NC, 2011 SHORT-TERM IRRADIANCE VARIABILITY  

E-Print Network (OSTI)

© American Solar Energy Society ­ Proc. ASES Annual Conference, Raleigh, NC, 2011 SHORT, as hypothesized in Hoff and Perez's optimum point. #12;© American Solar Energy Society ­ Proc. ASES Annual is the factor that determines whether the combined relative fluctuations of two solar systems add up when

Perez, Richard R.

75

A Guide to the External Review Process The Graduate School, NC State University  

E-Print Network (OSTI)

review by one of more faculty in the same field from other universities. The major steps in planning and disseminates the plan to participants in the upcoming post-review meeting. · At the post-review meetingA Guide to the External Review Process The Graduate School, NC State University The major purpose

Buckel, Jeffrey A.

76

NC State Chemical Engineering Degrees -MS Graduation Name NicknameGrad Date Hometown StateUndergrad Chair Initial Employer Employer City State  

E-Print Network (OSTI)

MIT Cambridge MA Floyd Edson Israel 6/4/1929 LeRoy KS Kansas State Randolph Mead Paper State Chesapeake-Camp Franklin VA Robert Perry Harris 6/5/1939 Raleigh NC NC State Carolina Coach

Velev, Orlin D.

77

File:USDA-CE-Production-GIFmaps-NC.pdf | Open Energy Information  

Open Energy Info (EERE)

NC.pdf NC.pdf Jump to: navigation, search File File history File usage North Carolina Ethanol Plant Locations Size of this preview: 776 × 600 pixels. Full resolution ‎(1,650 × 1,275 pixels, file size: 355 KB, MIME type: application/pdf) Description North Carolina Ethanol Plant Locations Sources United States Department of Agriculture Related Technologies Biomass, Biofuels, Ethanol Creation Date 2010-01-19 Extent State Countries United States UN Region Northern America States North Carolina External links http://www.nass.usda.gov/Charts_and_Maps/Ethanol_Plants/ File history Click on a date/time to view the file as it appeared at that time. Date/Time Thumbnail Dimensions User Comment current 16:17, 27 December 2010 Thumbnail for version as of 16:17, 27 December 2010 1,650 × 1,275 (355 KB) MapBot (Talk | contribs) Automated bot upload

78

STEPNCMillUoA: a CNC system based on STEP-NC and Function Block architecture  

Science Journals Connector (OSTI)

STEPNCMillUoA is the prototype of a new CNC system that utilises the STEP-NC data model and IEC 61499. STEP-NC provides a high-level data model and enables feature-based machining whereas the enabled layered Function Block architecture simplifies the design of the CNC controller. The architecture layers are responsible for data processing, storage and execution. The object-oriented Model-View-Control design pattern supports the system architecture and the design framework, in which simulation of the machining becomes natural and inherent part of the design process, with seamless transition from simulation to actual machining. This system possesses interoperability, portability, re-configurability and distribution characteristics. The system was tested through simulation and actual machining.

Mohamad Minhat; Xun Xu; Valeriy Vyatkin

2009-01-01T23:59:59.000Z

79

Career Map: Construction Worker  

Energy.gov (U.S. Department of Energy (DOE))

The Wind Program's Career Map provides job description information for Construction Worker positions.

80

Konrad Repository Facing its Construction  

SciTech Connect

According to the German Atomic Energy Act the Federation is responsible for the construction and operation of installations for the safekeeping and disposal of radioactive waste. This duty was assigned to the Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz - BfS). In 1982, the Federal Institute of Physics and Metrology (Physikalisch Technische Bundesanstalt - PTB) as the precursor of BfS applied for a license for the disposal of radioactive waste with negligible heat generation in the Konrad iron ore mine near Salzgitter at the Ministry for Environment of Lower Saxony. After 25 years of plan approval procedure and subsequent lawsuits the license is now valid and Konrad is waiting for construction. Facing this challenge BfS has established a project team to supervise the in-house and external activities to be done. It is intended to construct the Konrad repository within a preparation period of two years and a subsequent erection phase of four years. Thus, Konrad is planned to come into operation in 2013. In this paper the development of the plan approval procedure, the technical design of the planned repository, especially with regard to safety-related aspects, and the planning for the construction will be discussed. (authors)

Kunze, V. [Bundesamt fur Strahlenschutz (BfS), Salzgitter (Germany)

2008-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

* Department of Computer Science, Duke University, Box 90129, Durham, NC 27708-0129,  

E-Print Network (OSTI)

been recently considerable progress in construction of patterned nanostructures by use of synthetic DNA

Reif, John H.

82

A Framework to Explore Energy Saving Measures During Construction Phase  

Science Journals Connector (OSTI)

There has been a significant increase in interest and research in energy efficient buildings in recent years. In the ... construction. To make the construction phase less energy intensive, the contractor has to p...

Abdol R. Chini; Sandeep Shrivastava

2014-01-01T23:59:59.000Z

83

Architecture Engineering Construction (AEC)  

E-Print Network (OSTI)

Architecture Engineering Construction (AEC) Presented to FM Staff February 25, 2009 Updated March 1, 2010 #12;University of Maryland Baltimore Director Architecture, Engineering and Construction Vacant Administration & Finance Kathleen M. Byington #12;Division of Facilities Management Architecture, Engineering

Weber, David J.

84

Wanzek Construction | Open Energy Information  

Open Energy Info (EERE)

Wanzek Construction Wanzek Construction Jump to: navigation, search Logo: Wanzek Construction Name Wanzek Construction Address 2028 2nd Avenue NW Place West Fargo, ND Zip 58078 Country United States Sector Geothermal energy, Renewable Energy, Solar, Wind energy Product Turnkey Construction Services Stock Symbol MTZ Year founded 1971 Number of employees 1100 Company Type For Profit Company Ownership Public Small Business No Minority Business Yes Affiliated Companies MasTec N.A; MasTec Renewables; Phone number 2816064172 Website http://www.wanzek.com Coordinates 29.78577°, -95.66735° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":29.78577,"lon":-95.66735,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

85

Infrared spectra of ClCN{sup +}, ClNC{sup +}, and BrCN{sup +} trapped in solid neon  

SciTech Connect

When a mixture of ClCN or BrCN with a large excess of neon is codeposited at 4.3 K with a beam of neon atoms that have been excited in a microwave discharge, the infrared spectrum of the resulting solid includes prominent absorptions of the uncharged isocyanide, ClNC or BrNC, and of the corresponding cation, ClCN{sup +} or BrCN{sup +}. The NC-stretching fundamentals of the isocyanides trapped in solid neon lie close to the positions for their previously reported argon-matrix counterparts. The CN-stretching absorptions of ClCN{sup +} and BrCN{sup +} and the CCl-stretching absorption of ClCN{sup +} appear very close to the gas-phase band centers. Absorptions of two overtones and one combination band of ClCN{sup +} are identified. Reversible photoisomerization of ClCN{sup +} to ClNC{sup +} occurs. The two stretching vibrational fundamentals and several infrared and near infrared absorptions associated with electronic transitions of ClNC{sup +} are observed. Minor infrared peaks are attributed to the vibrational fundamental absorptions of the CX and CX{sup +} species (X=Cl,Br)

Jacox, Marilyn E.; Thompson, Warren E. [Optical Technology Division, National Institute of Standards and Technology, Gaithersburg, Maryland 20899-8441 (United States)

2007-06-28T23:59:59.000Z

86

Project Construction | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Construction Project Construction Project Construction October 16, 2013 - 5:14pm Addthis Building Design Project Construction Commisioning Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule. Construction Team

87

Feasibility, benefits and challenges of modular construction in high rise development in the United States : a developer's perspective  

E-Print Network (OSTI)

Modular construction has long been utilized in the construction of residential and many other commercial product types as a means for potentially quicker construction delivery times. Over the past 5 years this construction ...

Velamati, Sri

2012-01-01T23:59:59.000Z

88

Historical pipeline construction cost analysis  

Science Journals Connector (OSTI)

This study aims to provide a reference for the pipeline construction cost, by analysing individual pipeline cost components with historical pipeline cost data. Cost data of 412 pipelines recorded between 1992 and 2008 in the Oil and Gas Journal are collected and adjusted to 2008 dollars with the chemical engineering plant cost index (CEPCI). The distribution and share of these 412 pipeline cost components are assessed based on pipeline diameter, pipeline length, pipeline capacity, the year of completion, locations of pipelines. The share of material and labour cost dominates the pipeline construction cost, which is about 71% of the total cost. In addition, the learning curve analysis is conducted to attain learning rate with respect to pipeline material and labour costs for different groups. Results show that learning rate and construction cost are varied by pipeline diameters, pipeline lengths, locations of pipelines and other factors. This study also investigates the causes of pipeline construction cost differences among different groups. [Received: October 13, 2010; Accepted: December 20, 2010

Zhenhua Rui; Paul A. Metz; Doug B. Reynolds; Gang Chen; Xiyu Zhou

2011-01-01T23:59:59.000Z

89

Hygrothermal performance of EIFS-clad walls: Effect of vapor diffusion and air leakage on the drying of construction moisture [Exterior Insulation and Finish Systems  

SciTech Connect

Hydrothermal performance describes the response of the material layers that make up the wall to thermal and moisture loads. Modeling can be applied to determine the drying and wetting potential of walls with various initial construction moisture loads and to test alternative innovations. This paper investigates the drying performance of a particular barrier EIFS clad wall as a function of vapor diffusion control with a specific air leakage path. This investigation was conducted with constant interior temperature and relative humidity. The LATENITE model, developed at NRD, is employed in the investigation. This advanced hydrothermal model can incorporate system and sub-system performances by introducing simulated defects and wall system details derived from laboratory and field measurements. Moisture loads available to the EIFS structure originating either from the interior, the exterior or from initial construction moisture can be included. In this paper the authors present a study to determine the drying potential of a barrier EIFS clad wall for the climate of Wilmington, NC. This climate is characterized by the ASHRAE Handbook of Fundamentals as being mixed. The effect of drying and wetting by airflow was investigated by introducing airflow paths. Hydrothermal performance with three different vapor diffusion control strategies and two air leakage conditions was simulated for a period of one year. Initial oriented strand board (OSB) moisture content was assumed to be very high. The influence of rain water, solar radiation and air movement within the cavity was included in the analysis.

Karagiozis, A.N.; Salonvaara, M.H.

1999-07-01T23:59:59.000Z

90

Construction | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Construction Construction In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. Learn more about the Better Buildings Neighborhood Program. In neighborhoods all across the country, the Energy Department's Better Buildings Neighborhood Program is helping families and business owners make energy efficiency upgrades that are saving them money and improving the comfort of our buildings. Learn more about the Better Buildings Neighborhood Program. Learn about the energy-efficient construction projects that are saving businesses and communities money while creating jobs.

91

Construction of Channels (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

Permission is required from the Natural Resources Commission is required for the construction or alteration of artificial channels or improved channels of natural watercourses that connect to any...

92

NC pi0 Production in the MiniBooNE Antineutrino Data  

E-Print Network (OSTI)

The single largest background to future numubar to nuebar (numu to nue) oscillation searches is neutral current pi0 production. MiniBooNE, which began taking antineutrino data in January 2006, has the world's largest sample of pi0's produced by antineutrinos in the 1 GeV energy range. These neutral pions are primarily produced through the delta resonance but can also be created through "coherent production." The latter process is the coherent sum of glancing scatters of (anti)neutrinos off a neutron or proton, in which the nucleus is kept intact but a pi0 is created. Current analysis of NC pi0 production in the MiniBooNE antineutrino data will be discussed.

V. T. Nguyen

2008-01-02T23:59:59.000Z

93

Constructability -- from Qinshan to the ACR  

SciTech Connect

Atomic Energy of Canada Limited (AECL) has recognized the importance of constructability for many years, and it is applying its principals to CANDU projects with increasing success. The CANDU 6 Nuclear Power Plant has been constructed eleven times in the last 25 years. However, the last two units completed on the Qinshan project in China have employed some very innovative construction methods that have not been used on the previous units. In order to make nuclear power generation more competitive, shorter construction schedules and reduced project cost and risks are essential objectives. The application of constructability principles is a major contributor to achieving these objectives. The success of Qinshan has increased the confidence in the new construction methods, which are being implemented on the ACR (Advanced CANDU Reactor) successfully. An ACR construction strategy that utilizes advanced construction techniques has been developed by AECL. The strategy includes paralleling of activities by using extensive modularization and the vertical installation of equipment and modules into the reactor building using a VHL (Very Heavy Lift) crane. This strategy allows short schedules to be met with a minimum risk to the project.

Elgohary, Medhat; Fairclough, Neville; Ricciuti, Rick

2003-09-01T23:59:59.000Z

94

NC State Chemical Engineering Degrees -PhD Graduation Name NicknameGrad Date Hometown StateUndergrad Chair Initial Employer Employer City State  

E-Print Network (OSTI)

Viirginia Chemicals Portsmouth VA Arthur Alexander Armstrong Jr Art 1/15/1957 Gastonia NC NC State/StanDuPont Camden SC Roger Thomas Johnson 8/15/1970 Milwaukee WI U. Wisconsin McCabe Richard Busbee Phillips Richard

Velev, Orlin D.

95

North Carolina State University, Campus Box 7409, Raleigh, NC 27695 | 1 919-523-8888 | www.nccleantech.ncsu.edu 2014 TRAINING PROGRAM | www.nccleantech.ncsu.edu  

E-Print Network (OSTI)

.S. awarded by the Department of Energy `s Solar Instructor Training Network. In this capacity, the Center Recognitions and Accreditations: The NC Solar Center at NC State University has been a hub for con nuing and maintain the NCSU Solar House and the adjacent training and research facili es, including a fully

96

ENVIRONMENTAL CONSTRUCTABILITY IN  

E-Print Network (OSTI)

Engineering Storm Water Quality #12;Linear Construction Flux · Natural resource protection is a design and phase of construction, from start to finish · Be fair for both engineer and contractor · Develop.eqb.state.mn.us/EnvRevGuidanceDocuments.htm Highway Project Design Process (HPDP) Subject Guidance Accessibility Requirements Air Quality Airports

Minnesota, University of

97

The Chlorella variabilis NC64A Genome Reveals Adaptation to Photosymbiosis, Coevolution with Viruses, and Cryptic Sex  

SciTech Connect

Chlorella variabilis NC64A, a unicellular photosynthetic green alga (Trebouxiophyceae), is an intracellular photobiont of Paramecium bursaria and a model system for studying virus/algal interactions. We sequenced its 46-Mb nuclear genome, revealing an expansion of protein families that could have participated in adaptation to symbiosis. NC64A exhibits variations in GC content across its genome that correlate with global expression level, average intron size, and codon usage bias. Although Chlorella species have been assumed to be asexual and nonmotile, the NC64A genome encodes all the known meiosis-specific proteins and a subset of proteins found in flagella. We hypothesize that Chlorella might have retained a flagella-derived structure that could be involved in sexual reproduction. Furthermore, a survey of phytohormone pathways in chlorophyte algae identified algal orthologs of Arabidopsis thaliana genes involved in hormone biosynthesis and signaling, suggesting that these functions were established prior to the evolution of land plants. We show that the ability of Chlorella to produce chitinous cell walls likely resulted from the capture of metabolic genes by horizontal gene transfer from algal viruses, prokaryotes, or fungi. Analysis of the NC64A genome substantially advances our understanding of the green lineage evolution, including the genomic interplay with viruses and symbiosis between eukaryotes.

Blanc, Guillaume; Duncan, Garry A.; Agarakova, Irina; Borodovsky, Mark; Gurnon, James; Kuo, Alan; Lindquist, Erika; Lucas, Susan; Pangailinan, Jasmyn; Polle, Juergen; Salamov, Asaf; Terry, Astrid; Yamada, Takashi; Dunigan, David D.; Grigoriev, Igor V.; Claverie, Jean-Michel; Etten, James L. Van

2010-05-06T23:59:59.000Z

98

Search for a Neutron Electric Dipole Moment at the SNS Brad Filippone (Caltech), Martin Cooper (LANL), Paul Huffman (NC State)  

E-Print Network (OSTI)

Search for a Neutron Electric Dipole Moment at the SNS Brad Filippone (Caltech), Martin Cooper (LANL), Paul Huffman (NC State) for the nEDM@SNS Collaboration The discovery of a neutron EDM (Electric and the empirical fact that matter exists in our universe. Experiments have searched for a neutron EDM for over six

99

Proceedings IEEE International Test Conference, Charlotte, NC, USA, September 30 October 2, 2003 A HYBRID CODING STRATEGY FOR  

E-Print Network (OSTI)

Proceedings IEEE International Test Conference, Charlotte, NC, USA, September 30 ­ October 2, 2003-fold solution: (1) The test data volume can be greatly reduced by simple encoding and decoding procedures. (2 A HYBRID CODING STRATEGY FOR OPTIMIZED TEST DATA COMPRESSION Armin Würtenberger, Christofer S. Tautermann

Hellebrand, Sybille

100

Two-phase nc-TiN/a-(C,CN{sub x}) nanocomposite films: A HRTEM and MC simulation study  

SciTech Connect

The grain growth in two-phase nanocomposite Ti-C{sub x}-N{sub y} thin films grown by reactive close-field unbalanced magnetron sputtering in an Ar-N{sub 2} gas mixture with microstructures comprising of nanocrystalline (nc-) Ti(N,C) phase surrounded by amorphous (a-) (C,CN{sub x}) phase was investigated by a combination of high-resolution transmission electron microscopy (HRTEM) and Monte Carlo (MC) simulations. The HRTEM results revealed that amorphous-free solid solution Ti(C,N) thin films exhibited polycrystallites with different sizes, orientations and irregular shapes. The grain size varied in the range between several nanometers and several decade nanometers. Further increase of C content (up to {approx}19 at.% C) made the amorphous phase wet nanocrystallites, which strongly hindered the growth of nanocrystallites. As a result, more regular Ti(C,N) nanocrystallites with an average size of {approx}5 nm were found to be separated by {approx}0.5-nm amorphous phases. When C content was further increased (up to {approx}48 at.% in this study), thicker amorphous matrices were produced and followed by the formation of smaller sized grains with lognormal distribution. Our MC analysis indicated that with increasing amorphous volume fraction (i.e. increasing C content), the transformation from nc/nc grain boundary (GB)-curvature-driven growth to a/nc GB-curvature-driven growth is directly responsible for the observed grain growth from great inhomogeneity to homogeneity process.

Guo, J.; Lu, Y. H.; Hu, X. J.; Shen, Y. G. [Department of Mechanical and Biomedical Engineering, City University of Hong Kong, Kowloon (Hong Kong)

2013-06-18T23:59:59.000Z

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Chapter 8: Constructing the Building  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

: : Constructing the Building Developing a Construction Plan Writing Effective Construction Documents Safeguarding Design Goals During Construction Protecting the Site Low-Impact Construction Processes Protecting Indoor Air Quality Managing Construction Waste LANL | Chapter 8 Constructing the Building Developing a Construction Plan A high-performance design is a great achievement, but it doesn't mean much if the building isn't then built as intended. Getting from design to a completed project happens in two stages: 1) development of construction documents and 2) actual construction. To successfully implement a sustainable design, the construction docu- ments must accurately convey the specifics that deter- mine building performance, and they have to set up

102

Y YEAR  

National Nuclear Security Administration (NNSA)

5 79 -7.06% YEAR 2013 2014 Males 59 57 -3.39% Females 26 22 -15.38% YEAR 2013 2014 SES 1 0 -100% EJEK 4 3 -25.00% EN 05 3 2 -33.33% EN 04 22 22 0% EN 03...

103

Y YEAR  

National Nuclear Security Administration (NNSA)

2 40 -4.76% YEAR 2013 2014 Males 37 35 -5.41% Females 5 5 0% YEAR 2013 2014 SES 2 2 0% EJEK 5 4 -20.00% EN 05 5 7 40.00% EN 04 6 6 0% EN 03 1 1 0% NN...

104

Y YEAR  

National Nuclear Security Administration (NNSA)

91 81 -10.99% YEAR 2013 2014 Males 67 56 -16.42% Females 24 25 4.17% YEAR 2013 2014 SES 1 2 100% EJEK 9 8 -11.11% EN 04 25 22 -12.00% NN (Engineering) 24...

105

Construction in year 2030: developing an information technology vision  

Science Journals Connector (OSTI)

...fuel cells or biomass boiler associated with it. Intelligent...the recession is over, high public investment will...Processes will become more efficient and streamlined through...Building (CIOB) and the Higher Education Academy. He...

2010-01-01T23:59:59.000Z

106

Construction in year 2030: developing an information technology vision  

Science Journals Connector (OSTI)

...associated with it: engineers or other users might...move beyond the visual environment and simulate the sensory...collaboration and collaboration environments; quality management...the Built and Human environment. He initially qualified...electronics design engineer with British Aerospace...

2010-01-01T23:59:59.000Z

107

Energy Efficient Residential Construction Tax Credit (Personal) |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Personal) Personal) Energy Efficient Residential Construction Tax Credit (Personal) < Back Eligibility Construction Residential Savings Category Home Weatherization Commercial Weatherization Sealing Your Home Heating & Cooling Commercial Heating & Cooling Cooling Construction Design & Remodeling Windows, Doors, & Skylights Ventilation Heating Heat Pumps Insulation Maximum Rebate 4,000 Program Info Start Date 11/01/2005 State Oklahoma Program Type Personal Tax Credit Rebate Amount Amount of eligible expenditures Provider Oklahoma Department of Commerce '''''Note: After a 2 year moratorium on all state tax credits, this credit may be claimed for tax year 2012 and subsequent tax years, for eligible expenditures on or after July 1, 2012.''''' Oklahoma allows a contractor who is the primary builder of an energy

108

Recovery Act Supports Construction of Site's Largest Groundwater Treatment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Supports Construction of Site's Largest Groundwater Supports Construction of Site's Largest Groundwater Treatment Facility Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility Construction of the largest groundwater treatment facility at the Hanford Site – a major American Recovery and Reinvestment Act project – is on schedule and more than 70 percent complete. Recovery Act workers with DOE contractor CH2M HILL Plateau Remediation Company are on pace to finish construction of the 200 West Groundwater Treatment Facility this year. Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility More Documents & Publications Hanford Treats Record Amount of Groundwater Recovery Act Invests in Cleanup, Preservation of Hanford Site Locomotives,

109

Existing schemes for constructing high concrete dams and ways to improve them  

Science Journals Connector (OSTI)

1. Improvement of the existing cyclic methods of constructing concrete dams in recent years made it possible to ...

V. I. Teleshev; V. K. Loshak

1982-10-01T23:59:59.000Z

110

Hackney Construction | Open Energy Information  

Open Energy Info (EERE)

Hackney Construction Hackney Construction Jump to: navigation, search Name Hackney Construction Address 309 Farrens Creek Lane/PO Box 13 Place Grangeville, Idaho Zip 83530 Sector Solar Product Green Building, renewable energy Year founded 1991 Number of employees 1-10 Phone number 208-983-3109 Website http://DigitalProductsAndRenew Coordinates 45.926552°, -116.1223654° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":45.926552,"lon":-116.1223654,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

111

Construction Readiness RM  

Energy.gov (U.S. Department of Energy (DOE))

The authorization to proceed with construction of a new facility is given at the CD-3 phase of the project management cycle, after completion of the final design. Between CD-3 and CD-4 stages of...

112

Pipeline Construction Guidelines (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

The Division of Pipeline Safety of the Indiana Utility Regulatory Commission regulates the construction of any segment of an interstate pipeline on privately owned land in Indiana. The division has...

113

Passive solar construction handbook  

SciTech Connect

Many of the basic elements of passive solar design are reviewed. The unique design constraints presented in passive homes are introduced and many of the salient issues influencing design decisions are described briefly. Passive solar construction is described for each passive system type: direct gain, thermal storage wall, attached sunspace, thermal storage roof, and convective loop. For each system type, important design and construction issues are discussed and case studies illustrating designed and built examples of the system type are presented. Construction details are given and construction and thermal performance information is given for the materials used in collector components, storage components, and control components. Included are glazing materials, framing systems, caulking and sealants, concrete masonry, concrete, brick, shading, reflectors, and insulators. The Load Collector Ratio method for estimating passive system performance is appended, and other analysis methods are briefly summarized. (LEW)

Levy, E.; Evans, D.; Gardstein, C.

1981-08-01T23:59:59.000Z

114

Genomic library construction  

SciTech Connect

Compositions and methods for amplifying nucleic acid sequences from a single cell are provided. Compositions and methods for constructing a genomic library from a single cell are also provided.

Church, George M. (Brookline, MA); Zhang, Kun (San Diego, CA)

2011-07-26T23:59:59.000Z

115

Weatherford Inclined Wellbore Construction  

SciTech Connect

The Rocky Mountain Oilfield Testing Center (RMOTC) has recently completed construction of an inclined wellbore with seven (7) inch, twenty-three (23) pound casing at a total depth of 1296 feet. The inclined wellbore is near vertical to 180 feet with a build angle of approximately 4.5 degrees per hundred feet thereafter. The inclined wellbore was utilized for further proprietary testing after construction and validation. The wellbore is available to other companies requiring a cased hole environment with known deviation out to fifty degrees (50) from vertical. The wellbore may also be used by RMOTC for further deepening into the fractured shales of the Steele and Niobrara formation.

Schulte, R.

2002-08-19T23:59:59.000Z

116

Univalent Foundation and Constructive Mathematics  

E-Print Network (OSTI)

Univalent Foundation and Constructive Mathematics Thierry Coquand Oberwolfach, November 18, 2014 #12;Univalent Foundation and Constructive Mathematics Univalent Foundations Voevodsky's program to express mathematics in type theory instead of set theory 1 #12;Univalent Foundation and Constructive

Coquand, Thierry

117

Construction Endorsement Process in Russia.  

E-Print Network (OSTI)

??The construction endorsement and receiving of construction permit is a long lasting and very complicated process in Russia. There is no one and only instruction (more)

Avanesov, Alexander

2010-01-01T23:59:59.000Z

118

Martifer Construction | Open Energy Information  

Open Energy Info (EERE)

services. The division operates in wind farm tower construction, also provides engineering services for solar projects. References: Martifer Construction1 This article...

119

Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

Construction Schedule Current Projects 27-ID and 35-ID APS Vibration Reporting Protocol Summary of Construction Equipment Tests and Activities Jan 2014 Past Projects APCF LOM438...

120

Material efficiency in construction  

E-Print Network (OSTI)

Japan Iron and Steel Federation kt Kilotonne LCA Life-cycle assessment MFA Mass flow analysis Mt Megatonne xix Nomenclature rebar Reinforcement bar RuFUS Reuse of Foundations on Urban Sites SCI Steel Construction Institute t Tonne U/R Utilisation ratio...

Moynihan, Muiris

2014-10-07T23:59:59.000Z

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

mail: Sitterson Hall CB3175, Chapel Hill, NC 27599-3175; phone: (919) 962-1700; email: lastname@cs.unc.edu.  

E-Print Network (OSTI)

mail: Sitterson Hall CB3175, Chapel Hill, NC 27599-3175; phone: (919) 962-1700; email: lastname and to swim around as the user moves. In a 1986 paper on Adaptive Refinement, Bergman, Fuchs, Grant, and Spach

Bishop, Gary

122

Philadelphia Gas Works - Residential and Commercial Construction Incentives  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Philadelphia Gas Works - Residential and Commercial Construction Philadelphia Gas Works - Residential and Commercial Construction Incentives Program (Pennsylvania) Philadelphia Gas Works - Residential and Commercial Construction Incentives Program (Pennsylvania) < Back Eligibility Commercial Industrial Multi-Family Residential Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Maximum Rebate Residential: $750 Commercial: $60,000 Program Info Start Date 9/1/2012 Expiration Date 8/31/2015 State Pennsylvania Program Type Utility Rebate Program Rebate Amount '''Residential''' Residential Construction: $750 '''Commercial/Industrial''' 10% to 20% to 30% above code, $40/MMBtu first-year savings Philadelphia Gas Works (PGW) provides incentives to developers, home

123

Sequence and annotation of the 369-kb NY-2A and the 345-kb AR158 viruses that infect Chlorella NC64A  

E-Print Network (OSTI)

Sequence and annotation of the 369-kb NY-2A and the 345-kb AR158 viruses that infect Chlorella NC64, unicellular, eukaryotic, chlorella-like green alga, Chlorella NC64A. The 368,683-bp genome of NY-2A and the 344,690-bp genome of AR158 are the two largest chlorella virus genomes sequenced to date; NY-2A

Graves, Michael V.

124

Construction Readiness RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Readiness Review Module Construction Readiness Review Module March 2010 CD- [This Rev Readiness -0 view Module w s Review (CRR OFFICE O CD-1 was used to dev R). This Review OF ENVIRO Standard R Construc Rev Critical D CD-2 M velop the Revie w Module cont ONMENTA Review Pla ction Rea view Modul Decision (CD C March 2010 ew Plan for Sal tains the lesson Review.] AL MANAG an (SRP) adiness le D) Applicabili D-3 lt Waste Proce ns learned from GEMENT ity CD-4 ssing Facility ( m the SWPF Co Post Ope (SWPF) Const onstruction Re eration truction eadiness Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental

125

Construction quality assurance report  

SciTech Connect

This report provides a summary of the construction quality assurance (CQA) observation and test results, including: The results of the geosynthetic and soil materials conformance testing. The observation and testing results associates with the installation of the soil liners. The observation and testing results associated with the installation of the HDPE geomembrane liner systems. The observation and testing results associated with the installation of the leachate collection and removal systems. The observation and testing results associated with the installation of the working surfaces. The observation and testing results associated with in-plant manufacturing process. Summary of submittal reviews by Golder Construction Services, Inc. The submittal and certification of the piping material specifications. The observation and verification associated of the Acceptance Test Procedure results of the operational equipment functions. Summary of the ECNs which are incorporated into the project.

Roscha, V.

1994-09-08T23:59:59.000Z

126

Toward a constructive physics  

SciTech Connect

We argue that the discretization of physics which has occurred thanks to the advent of quantum mechanics has replaced the continuum standards of time, length and mass which brought physics to maturity by counting. The (arbitrary in the sense of conventional dimensional analysis) standards have been replaced by three dimensional constants: the limiting velocity c, the unit of action h, and either a reference mass (eg m/sub p/) or a coupling constant (eg G related to the mass scale by hc/(2..pi..Gm/sub p//sup 2/) approx. = 1.7 x 10/sup 38/). Once these physical and experimental reference standards are accepted, the conventional approach is to connect physics to mathematics by means of dimensionless ratios. But these standards now rest on counting rather than ratios, and allow us to think of a fourth dimensionless mathematical concept, which is counting integers. According to constructive mathematics, counting has to be understood before engaging in the practice of mathematics in order to avoid redundancy. In its strict form constructive mathematics allows no completed infinities, and must provide finite algorithms for the computation of any acceptable concept. This finite requirement in constructive mathematics is in keeping with the practice of physics when that practice is restricted to hypotheses which are testable in a finite time. In this paper we attempt to outline a program for physics which will meet these rigid criteria while preserving, in so far as possible, the successes that conventional physics has already achieved.

Noyes, H.P.; Gefwert, C.; Manthey, M.J.

1983-06-01T23:59:59.000Z

127

Rocky Flats Former Construction Workers, Construction Worker Screening  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Rocky Flats Former Construction Workers, Construction Worker Rocky Flats Former Construction Workers, Construction Worker Screening Projects Rocky Flats Former Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Rocky Flats Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Local Outreach Office: Dwayne Adkins 7510 W. Mississippi Ave., Suite 230 Lakewood, CO 80226 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica

128

Idaho National Laboratory Former Construction Workers, Construction Worker  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Idaho National Laboratory Former Construction Workers, Construction Idaho National Laboratory Former Construction Workers, Construction Worker Screening Projects Idaho National Laboratory Former Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Idaho National Laboratory (INL) Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: 1-800-866-9663 Local Outreach Office: Dan Obray 456 N. Arthur Avenue Pocatello, ID 83204 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica

129

Waste Isolation Pilot Plant Construction Workers, Construction Worker  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Waste Isolation Pilot Plant Construction Workers, Construction Waste Isolation Pilot Plant Construction Workers, Construction Worker Screening Projects Waste Isolation Pilot Plant Construction Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: WIPP Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPh, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

130

Office of Design and Construction Architecture/Engineering/Construction Management  

E-Print Network (OSTI)

to construct the Orchestra Pit, and above-grade masonry walls will continue through winter, as weather permits 2011 Project Manager: Tim Burns, Sr. Project Manager - Construction Comments: This is part two

Moore, Paul A.

131

Pinellas Former Construction Worker, Construction Worker Screening Projects  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Pinellas Former Construction Worker, Construction Worker Screening Pinellas Former Construction Worker, Construction Worker Screening Projects Pinellas Former Construction Worker, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Pinellas Worker Population Served: Construction Workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: 1-800-866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by

132

Pipeline compressor station construction cost analysis  

Science Journals Connector (OSTI)

This study aims to provide a reference for pipeline compressor station construction costs by analysing individual compressor station cost components using historical compressor station cost data between 1992 and 2008. Distribution and share of these pipeline compressor station cost components are assessed based on compressor station capacity, year of completion, and locations. Average unit costs in material, labour, miscellaneous, land, and total costs are $866/hp, $466/hp, $367/hp, $13/hp, and $1,712/hp, respectively. Primary costs for compressor stations are material cost, approximately 50.6% of the total cost. This study conducts a learning curve analysis to investigate the learning rate of material and labour costs for different groups. Results show that learning rates and construction component costs vary by capacity and locations. This study also investigates the causes of pipeline compressor station construction cost differences. [Received: March 25, 2012; Accepted; 20 February 2013

Yipeng Zhao; Zhenhua Rui

2014-01-01T23:59:59.000Z

133

Student ID Advisor 1st Year Fall __________ (year) 1st Year Spr. __________ (year) 1st Year Sum. __________ (year)  

E-Print Network (OSTI)

Name Major Student ID Advisor 1st Year Fall __________ (year) 1st Year Spr. __________ (year) 1st) Projected Graduation Date SUBJECT SUBJECT CR. HRS. SUBJECT COURSE # CR. HRS. Advisor Signature Date Student

Barrash, Warren

134

Univalent Foundation and Constructive Mathematics  

E-Print Network (OSTI)

Univalent Foundation and Constructive Mathematics Thierry Coquand Luminy, April 7, 2014 #12;Univalent Foundation and Constructive Mathematics References on univalent foundation V. Voevodsky Univalent foundation home page and "Experimental library of univalent foundation of mathematics" B. Ahrens. C. Kapulkin

Coquand, Thierry

135

Construction Project Number  

NLE Websites -- All DOE Office Websites (Extended Search)

North Execution - (2009 - 2011) North Execution - (2009 - 2011) Construction Project Number 2009 2010 2011 Project Description ANMLPL 0001C 76,675.32 - - Animas-Laplata circuit breaker and power rights CRGRFL 0001C - - 7,177.09 Craig Rifle Bay and transfer bay upgrade to 2000 amps; / Convert CRG RFL to 345 kV out of Bears Ear Sub FGE 0019C - - 39,207.86 Replace 69/25kV transformer KX2A at Flaming Gorge FGE 0020C - - 52,097.12 Flaming Gorge: Replace failed KW2A transformer HDN 0069C 16,638.52 208,893.46 3,704,578.33 Replace failed transformer with KZ1A 250 MVA 230/138kv

136

SF6432-CN Construction  

NLE Websites -- All DOE Office Websites (Extended Search)

7/31/13 7/31/13 Page 1 of 31 Printed copies of this document are uncontrolled. Retrieve latest version electronically. SANDIA CORPORATION SF 6432-CN (07/2013) Section II STANDARD TERMS AND CONDITIONS FOR FIRM-FIXED PRICE COMMERCIAL CONSTRUCTION CONTRACTS THE FOLLOWING CLAUSES APPLY TO THIS CONTRACT AS INDICATED UNLESS SPECIFICALLY DELETED, OR EXCEPT TO THE EXTENT THEY ARE SPECIFICALLY SUPPLEMENTED OR AMENDED IN WRITING IN THE COVER PAGE OR SECTION I. (CTRL+CLICK ON A LINK BELOW TO ADVANCE DIRECTLY TO THAT SECTION) ACCEPTANCE OF TERMS AND CONDITIONS (Ts&Cs) APPLICABLE LAW ASSIGNMENT AUTHORIZED DISTRIBUTORS BANKRUPTCY CANCELLATION OR TERMINATION FOR CONVENIENCE CHANGES COMPLIANCE WITH LAWS DEFINITIONS DIFFERING SITE CONDITIONS DISPUTES

137

Immunosuppressive effects of fisetin against dinitrofluorobenzene-induced atopic dermatitis-like symptoms in NC/Nga mice  

Science Journals Connector (OSTI)

Abstract Atopic dermatitis (AD) is a multifactorial chronic skin disorder that is increasing in prevalence globally. In NC/Nga mice, repetitive epicutaneous applications of 2-4-dinitrofluorobenzene (DNFB) induces AD-like clinical symptoms. Bioflanonol fisetin (3,7,3?,4?-tetrahydroxyflavone) is a dietary component found in plants, fruits and vegetables. Fisetin has various physiological effects that include anti-oxidation, anti-angiogenesis, anti-carcinogenesis and anti-inflammation. In this study, we investigated whether fisetin relieves AD-like clinical symptoms induced by repeated DNFB treatment in NC/Nga mice. Fisetin significantly inhibited infiltration of inflammatory cells including eosinophils, mast cells and CD4+ T and CD8+ T cells, and suppressed the expressions of cytokines and chemokines associated with dermal infiltrates in AD-like skin lesions. Total serum immunoglobulin E (IgE) levels and the ratio of phospho-NF-?B p65 to total NF-?B p65 were markedly reduced by fisetin. Fisetin also reduced the production of interferon-gamma and interleukin-4 by activated CD4+ T cells in a dose-dependent manner, whereas the anti-inflammatory cytokine, interleukin-10 was increased. These results implicate fisetin as a potential therapeutic for AD.

Gun-Dong Kim; Seung Eun Lee; Yong Seek Park; Dong-Hoon Shin; Gwi Gun Park; Cheung-Seog Park

2014-01-01T23:59:59.000Z

138

Univalent Foundation and Constructive Mathematics  

E-Print Network (OSTI)

Univalent Foundation and Constructive Mathematics Thierry Coquand Oberwolfach, November 21, 2014 #12;Univalent Foundation and Constructive Mathematics Family of sets over a set Cf. Exercice 3,Richman and Ruitenburg 1 #12;Univalent Foundation and Constructive Mathematics Family of sets over a set We have

Coquand, Thierry

139

Cedar Falls Utilities - Residential New Construction Program | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Cedar Falls Utilities - Residential New Construction Program Cedar Falls Utilities - Residential New Construction Program Cedar Falls Utilities - Residential New Construction Program < Back Eligibility Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Program Info State Iowa Program Type Utility Rebate Program Rebate Amount 25% electric rate discount for 4 years (if home is heated with natural gas) 25% electric rate discount for 2 years (if home is heated with electricity) Provider Cedar Falls Utilities Cedar Falls Utilities offers incentives to residential customers who construct new energy efficient homes. A rate discount of 25% is available to customers who meet the 5 Star Home Program criteria for new home

140

Small business success story: Lindblad Construction | Argonne National  

NLE Websites -- All DOE Office Websites (Extended Search)

Lindblad is the contractor for the laboratory's Rapid Response Program, which allows for construction activities valued at $50,000 and under to be performed on an accelerated schedule. The contract is for a three-year period for an estimated total of $3 million. Lindblad is the contractor for the laboratory's Rapid Response Program, which allows for construction activities valued at $50,000 and under to be performed on an accelerated schedule. The contract is for a three-year period for an estimated total of $3 million. Lindblad is the contractor for the laboratory's Rapid Response Program, which allows for construction activities valued at $50,000 and under to be performed on an accelerated schedule. The contract is for a three-year period for an estimated total of $3 million. Small business success story: Lindblad Construction March 27, 2013 Tweet EmailPrint Based in Joliet, Ill., Lindblad Construction has been performing construction services in the Chicagoland area for more than 60 years. Over the last five years, Lindblad has secured a number of sub-contracts

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Power 2010 Program: Combined Construction and Operating Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

142

Nuclear Power 2010 Program: Combined Construction and Operating License &  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Power 2010 Program: Combined Construction and Operating Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program together with the financial incentives provided by the Energy Policy Act of 2005 are the two primary reasons why a number of license applications for new nuclear construction are before the NRC today, and why the first new nuclear plants in over 30 years are under construction in the United States. As with all significant endeavors, there are lessons to be learned from the

143

Hanford Construction Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONSTRUCTION CONSTRUCTION WORKES AT HANFORD: A NEEDS ASSESSMENT Submitted by Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Central Washington Building and Construction Trades Council In cooperation with United Brotherhood of Carpenters University of Cincinnati Occupational Health Foundation George Washington University Zenith Administrators, Inc. Duke University July 1, 1997 Table bt Cóütn 1. Introduction and Background a. Specific Aims b. Rationale for Program 2. Need for Establishing Medical Evaluation and Notification a. Medical Surveillance b. History of Site c. Special Issues for Construction Workers 3. Size of Construction Workers' Population (Since 1943) a. Crude Estimate of Population Size b. Population Before 1950 c. Population After 1950

144

SUN (re)construction | Open Energy Information  

Open Energy Info (EERE)

SUN (re)construction SUN (re)construction Jump to: navigation, search Logo: SUN (re)construction Name SUN (re)construction Address 1351 Harker Avenue Place Palo Alto, California Zip 94301 Sector Efficiency Product Zero-net and grid-neutral buildings Year founded 2009 Number of employees 1-10 Phone number 805.679.3616 Website http://www.sunreconstruction.c Coordinates 37.446933°, -122.141049° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":37.446933,"lon":-122.141049,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

145

Utility Power Plant Construction (Indiana)  

Energy.gov (U.S. Department of Energy (DOE))

This statute requires a certificate of necessity from the Indiana Utility Regulatory Commission for the construction, purchase, or lease of an electricity generation facility by a public utility.

146

Chapter 8: Constructing the Building  

Energy.gov (U.S. Department of Energy (DOE))

Chapter 8 of the LANL Sustainable Design Guide contains information for construction of the building so it will perform as intended and protect the environment.

147

Career Map: Construction Manager | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

A construction manager in a yellow safety vest instructs his team on proper wind turbine installation. Construction Manager Position Title Construction Manager Alternate...

148

Integrating Safety into Design and Construction | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Integrating Safety into Design and Construction Integrating Safety into Design and Construction DepSecMemoIntegratingSafetyInDesignAndConstruction05Dec2005.pdf More Documents &...

149

North Carolina State University, Campus Box 7409, Raleigh, NC 27695 | 919-513-7831 | www.nccleantech.ncsu.edu 9/17/12 Advancing Clean Energy for a Sustainable Economy  

E-Print Network (OSTI)

.nccleantech.ncsu.edu 9/17/12 Advancing Clean Energy for a Sustainable Economy Clean Transportation | www.nccleantech.ncsu.edu Clean Fuel Advanced Technology (CFAT) 2010-2012: Iredell County Sheriff Propane (LPG) Vehicle Summary Clean Fuel Advanced Technology (CFAT) Project 2006-2012: Administered by the NC Solar Center at NC State

150

Wind Energy | www.ncsc.ncsu.edu North Carolina State University, Campus Box 7401, Raleigh, NC 27695 | 1 919-515-3480 | www.ncsc.ncsu.edu  

E-Print Network (OSTI)

Wind Energy | www.ncsc.ncsu.edu North Carolina State University, Campus Box 7401, Raleigh, NC 27695 | 1 919-515-3480 | www.ncsc.ncsu.edu U.S. Wind Industry Wind energy development is growing rapidly in the United States, with utility scale projects installed in 37 states as of 2010. The U.S. wind energy

151

Resonant tunneling with high peak to valley current ratio in SiO{sub 2}/nc-Si/SiO{sub 2} multi-layers at room temperature  

SciTech Connect

We have investigated carrier transport in SiO{sub 2}/nc-Si/SiO{sub 2} multi-layers by room temperature current-voltage measurements. Resonant tunneling signatures accompanied by current peaks are observed. Carrier transport in the multi-layers were analyzed by plots of ln(I/V{sup 2}) as a function of 1/V and ln(I) as a function of V{sup 1/2}. Results suggest that besides films quality, nc-Si and barrier sub-layer thicknesses are important parameters that restrict carrier transport. When thicknesses are both small, direct tunneling dominates carrier transport, resonant tunneling occurs only at certain voltages and multi-resonant tunneling related current peaks can be observed but with peak to valley current ratio (PVCR) values smaller than 1.5. When barrier thickness is increased, trap-related and even high field related tunneling is excited, causing that multi-current peaks cannot be observed clearly, only one current peak with higher PVCR value of 7.7 can be observed. While if the thickness of nc-Si is large enough, quantum confinement is not so strong, a broad current peak with PVCR value as high as 60 can be measured, which may be due to small energy difference between the splitting energy levels in the quantum dots of nc-Si. Size distribution in a wide range may cause un-controllability of the peak voltages.

Chen, D. Y., E-mail: cdy7659@126.com [Department of Physics, Nanjing National Laboratory of Microstructures and Key Laboratory of Advanced Photonic and Electronic, materials, Nanjing University, Nanjing 210093 (China); Nanjing University of posts and Telecommunications, Nanjing 210046 (China); Sun, Y.; He, Y. J. [Nanjing University of posts and Telecommunications, Nanjing 210046 (China); Xu, L.; Xu, J. [Department of Physics, Nanjing National Laboratory of Microstructures and Key Laboratory of Advanced Photonic and Electronic, materials, Nanjing University, Nanjing 210093 (China)

2014-01-28T23:59:59.000Z

152

North Carolina State University, Campus Box 7401, Raleigh, NC 27695 | 1 919-515-3480 | www.ncsc.ncsu.edu 2012 Instructions for Site Assessment Request  

E-Print Network (OSTI)

cost / benefit analysis of recommended renewable energy systems for your business, along with financing sug- gestions. Potential renewable energy technologies include the following and more: solar PV, solar? An experienced energy engineer from the North Carolina Solar Center at NC State University will conduct your

153

Energy Policy Program | www.nccleantech.ncsu.edu North Carolina State University, Campus Box 7409, Raleigh, NC 27695 | 919-515-3480 | www.nccleantech.ncsu.edu 2014  

E-Print Network (OSTI)

Credit (ITC) The federal government provides a tax credit worth 30 percent of the full installed costs Renewable Energy Tax Credit North Carolina offers a tax credit of 35percent of the cost of renewable energy projects, note that the N.C. tax credit also applies to wind, hydroelectric, biomass, geothermal

154

June M. Merlino, Training & Organizational Development Consultant June Merlino joined NC State in April 2010 and currently serves as a training and organizational  

E-Print Network (OSTI)

organizational and leadership development consultant/coach supporting with change, learning strategies and talentJune M. Merlino, Training & Organizational Development Consultant June Merlino joined NC State in April 2010 and currently serves as a training and organizational development consultant. June offers

155

Compositions of constructed microbial mats  

DOE Patents (OSTI)

Compositions and methods of use of constructed microbial mats, comprising cyanobacteria and purple autotrophic bacteria and an organic nutrient source, in a laminated structure, are described. The constructed microbial mat is used for bioremediation of different individual contaminants and for mixed or multiple contaminants, and for production of beneficial compositions and molecules.

Bender, Judith A. (Atlanta, GA); Phillips, Peter C. (Decatur, GA)

1999-01-01T23:59:59.000Z

156

FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) | Department...  

Office of Environmental Management (EM)

FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) Form provides information on the federal assistance budget for...

157

From Construction to Making Homes More Livable | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

From Construction to Making Homes More Livable From Construction to Making Homes More Livable From Construction to Making Homes More Livable July 21, 2010 - 3:14pm Addthis Barry Moir has seen the ebb and flow of the construction business. After working nine years in museum construction, he lost his job and started the challenging process of finding work. With a background that also included rehabilitating homes, Moir found an opportunity as a building performance specialist with weatherization service provider ACTION, Inc., in Gloucester, Mass. Compared to his previous work, Moir says, "[ACTION] is much more satisfying. We can do a much more thorough job where we don't have to leave things undone due to funding." Moir was one of two new hires with the nonprofit which has weatherized than 230 homes through the American Recovery and Reinvestment Act. In total,

158

Construction or Extended Operation of Nuclear Plant (Vermont) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction or Extended Operation of Nuclear Plant (Vermont) Construction or Extended Operation of Nuclear Plant (Vermont) Construction or Extended Operation of Nuclear Plant (Vermont) < Back Eligibility Investor-Owned Utility Utility Program Info State Vermont Program Type Siting and Permitting Any petition for approval of construction of a nuclear energy generating plant within the state, or any petition for approval of the operation of a nuclear energy generating plant beyond the date established in a certificate of public good issued under this title, must be submitted to the public service board no later than four years before the date upon which the approval may take effect. Upon receipt of a petition for approval of construction or operation as provided under this section, the public service board shall notify the

159

From Construction to Making Homes More Livable | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

From Construction to Making Homes More Livable From Construction to Making Homes More Livable From Construction to Making Homes More Livable July 21, 2010 - 3:14pm Addthis Barry Moir has seen the ebb and flow of the construction business. After working nine years in museum construction, he lost his job and started the challenging process of finding work. With a background that also included rehabilitating homes, Moir found an opportunity as a building performance specialist with weatherization service provider ACTION, Inc., in Gloucester, Mass. Compared to his previous work, Moir says, "[ACTION] is much more satisfying. We can do a much more thorough job where we don't have to leave things undone due to funding." Moir was one of two new hires with the nonprofit which has weatherized than 230 homes through the American Recovery and Reinvestment Act. In total,

160

MassSAVE (Electric) - Commercial New Construction Program | Department of  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

MassSAVE (Electric) - Commercial New Construction Program MassSAVE (Electric) - Commercial New Construction Program MassSAVE (Electric) - Commercial New Construction Program < Back Eligibility Commercial Construction Industrial Installer/Contractor Institutional Local Government Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Manufacturing Other Construction Heat Pumps Heating Appliances & Electronics Commercial Lighting Lighting Maximum Rebate 70% of incremental cost of higher efficiency equipment, or an amount that buys down the incremental investment to a 1.5 year simple payback. Program Info State Massachusetts Program Type Utility Rebate Program Rebate Amount Custom Lighting: $0.40 - $1.00/watt saved High Efficiency Fluorescent Systems: $10-$35/fixture High and Low Bay Fluorescents: $20 - $40/fixture

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Construction Spending | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Spending Spending BusinessUSA Data/Tools Apps Challenges Let's Talk BusinessUSA You are here Data.gov » Communities » BusinessUSA » Data Construction Spending Dataset Summary Description Construction Spending provides monthly estimates of the total dollar value of construction work done in the U.S. Construction Spending covers the dollar construction work done each month on new structures or improvements to existing structures for private and public sectors. Data estimates include the cost of labor and materials, cost of architectural and engineering work, overhead costs, interest and taxes paid during construction, and contractor's profits. Tags {construction,spending,value,"put in place",private,residential,nonresidential,public,state,local,federal,lodging,office,commercial,"health care",educational,religious,safety,amusement,recreation,transportation,communication,power,highway,street,sewage,waste,disposal,water,supply,conservation,development,manufacturing,structure,building,single-family,multifamily,housing,new,improvement,existing,sectors,cost," labor",materials,architectural,engineering,overhead,interest,taxes,contractor,profit}

162

Vectren Energy Delivery of Indiana (Electric) - Commercial New Construction  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Vectren Energy Delivery of Indiana (Electric) - Commercial New Vectren Energy Delivery of Indiana (Electric) - Commercial New Construction Rebates (Indiana) Vectren Energy Delivery of Indiana (Electric) - Commercial New Construction Rebates (Indiana) < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit State Government Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Windows, Doors, & Skylights Maximum Rebate Custom/HVAC Systems: $100,000 or 50% of the total project cost Incentive cannot buy down project below 1.5 years payback. Program Info State Indiana Program Type Utility Rebate Program Rebate Amount HVAC Systems (New Construction): $0.12/kWh reduced

163

Operating experience with constructed wetlands for wastewater treatment  

SciTech Connect

Constructed wetlands are treating a variety of municipal, industrial, and runoff wastewaters. The growing interest in this technology is based on 20 years of research demonstrating the beneficial effects of wetlands on water quality, particularly their ability to assimilate carbonaceous and nitrogenous wastes. Constructed wetlands are an attractive option for applications where a land-intensive, natural' treatment technology is desired and where ancillary wildlife benefits will enhance a project's overall environmental balance sheet. This paper summarizes design and operating experience from constructed wetlands representing a variety of applications, including pilot systems in place at several US pulp mills.

Knight, R. (CH2M Hill, Gainesville, FL (United States))

1993-01-01T23:59:59.000Z

164

Materials Requirements for Pipeline Construction  

Science Journals Connector (OSTI)

...find wide use in quality control procedures...problems to the engineer. Relatively...construction engineer is to build a...supply of high quality pipes and a sound...to offer the engineer reproducibility and quality at the right...

1976-01-01T23:59:59.000Z

165

Pipelines in the constructed environment  

SciTech Connect

New pipeline construction, the maintenance of existing pipelines, and the rehabilitation or replacement of deteriorating pipelines often takes place with many challenges and constraints imposed by developmental regulations. The 1998 Pipeline Division Conference provided a forum for those involved in the field to share ideas and learn more about the issues faced today. These 92 peer-reviewed papers reflect the current methods and technology in the field of pipeline construction.

Castronovo, J.P.; Clark, J.A. [eds.

1998-07-01T23:59:59.000Z

166

Fiscal Year 2013 Revegetation Assessment  

SciTech Connect

This report summarizes the Fiscal Year 2013 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to supplement documentation related to the Storm Water Pollution Prevention Plan for Construction Activities and to ensure that disturbed vegetation and soil at various locations are being restored. This report provides the following information for each site being monitored by the Idaho National Laboratory Environmental Support and Services: Summary of each site Assessment of vegetation status and site stabilization at each location Actions and Resolutions for each site. Six disturbed sites were evaluated for this assessment. One has achieved final stabilization. The remaining five sites not meeting the criteria for final stabilization will be evaluated again in the next fiscal year.

Jenifer Nordstrom

2013-11-01T23:59:59.000Z

167

FALL SPRING FALL SPRING FALL SPRINGFALL SPRING YEAR 1 YEAR 2 YEAR 3 YEAR 4  

E-Print Network (OSTI)

B FALL SPRING FALL SPRING FALL SPRINGFALL SPRING YEAR 1 YEAR 2 YEAR 3 YEAR 4 ECHM 100 (CHBE 100) 2). There is a pre- requisite of M-273Q (MATH 224). CHMY-373 (CHEM 324) could be taken Spring of year 3. Also, CHMY Math Placement ExamB M-172-Q (MATH 182) 4 cr Chemical Engineering Prerequisite Flowchart Catalog: 2010

Lawrence, Rick L.

168

FALL SPRING FALL SPRING FALL SPRINGFALL SPRING YEAR 1 YEAR 2 YEAR 3 YEAR 4  

E-Print Network (OSTI)

B FALL SPRING FALL SPRING FALL SPRINGFALL SPRING YEAR 1 YEAR 2 YEAR 3 YEAR 4 CHBE 100 2 cr CHMY-141 324) could be taken Spring of year 3. Also, CHMY-371 (CHEM 323) may be substituted for CHMY-373 (CHEM Engineering Prerequisite Flowchart Catalog: 2008-2010 updated 2009 rev. 06/29/10, rwl ­ new course numbers E

Lawrence, Rick L.

169

First & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall Spring Fall  

E-Print Network (OSTI)

) Social World Elective2 (3) Technical Elective5 CHEMICAL ENGINEERING Curriculum for Spring SemesterFirst & Second Years Third Year (Junior) Forth Year (Senior) Fifth Year Fall1 Spring1 Fall Spring Fall For your Freshman and Sophomore years, students should follow

Mountziaris, T. J.

170

Berkeley Lab Site Construction Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Construction Projects Construction Projects Old Town Demolition Project Manager: Ted Mankowski, TMankowski@lbl.gov Seismic Upgrades: Phase 2 Project Manager: Jack Heffernan, JSHeffernan@lbl.gov User Test Bed Facility/ FLEXLAB Project Manager: Dan Galvez, DCGalvez@lbl.gov UC Capital Projects Computational Research and Theory Facility Project Manager: Henry Martinez, HMartinez@lbl.gov Solar Energy Research Center (SERC) Project Manager: Jules Feher, JFeher@lbl.gov In Partnership with UC Berkeley Second Campus Sr. Project Manager: Doug Lockhart, DELockhart@lbl.gov What's Happening in the Next Several Weeks: Computational Research & Theory Facility: Currently, the main construction activities are steel and deck placement. The steel placement is due to be complete in December of 2013 and the exterior skin will follow. Project

171

Thesaurus construction through knowledge representation  

Science Journals Connector (OSTI)

Semantic metadata describing subject content plays a vital role in supporting indexing and retrieval in Digital Libraries. Mechanisms used to deliver this metadata include keyword collections, thesauri and classifications. Constructing a large thesaurus, however, is a difficult process which can be facilitated through the application of knowledge representation techniques developed for managing and reasoning about concepts. We describe such a scheme a Description Logic (DL) and show through an example how a DL can play a part in the classification construction process, aiding in the production of coherent hierarchies and ensuring that the relationships represented in a thesaurus are sensible.

Sean Bechhofer; Carole Goble

2001-01-01T23:59:59.000Z

172

Commissioning through "EDF Tower" construction  

E-Print Network (OSTI)

michel rouillot -architecte d.p.l.g. CommissioningCommissioningthrough through ??EDF TowerEDF Tower? construction? construction by Michel Rouillot Architect D.P.L.G. michel rouillot -architecte d.p.l.g. What is a building project ? michel rouillot... -architecte d.p.l.g. A spatial answerfor a work structure michel rouillot -architecte d.p.l.g. A very strong relationship between many building participants michel rouillot -architecte d.p.l.g. The production of the buildingThe production of the building...

Rouillot, M.

2004-01-01T23:59:59.000Z

173

DOE - Office of Legacy Management -- Chemical Construction Co Linden Pilot  

Office of Legacy Management (LM)

Chemical Construction Co Linden Chemical Construction Co Linden Pilot Plant - NJ 12 FUSRAP Considered Sites Site: Chemical Construction Co., Linden Pilot Plant (NJ.12 ) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: Chemical Construction Corporation Pilot Plant Chemico NJ.12-1 NJ.12-2 Location: Linden , New Jersey NJ.12-3 Evaluation Year: 1987 NJ.12-4 Site Operations: Performed research and development operations under AEC contract to develop a process for recovering uranium, cobalt, nickel, and copper from low grade residues. NJ.12-5 NJ.12-6 NJ.12-7 Site Disposition: Eliminated - Potential for contamination considered remote due to nature and duration of the operations NJ.12-4 NJ.12-8 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium NJ.12-6

174

Austin Energy - Commercial New Construction Efficiency Rebates | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Austin Energy - Commercial New Construction Efficiency Rebates Austin Energy - Commercial New Construction Efficiency Rebates Austin Energy - Commercial New Construction Efficiency Rebates < Back Eligibility Commercial Fed. Government Industrial Local Government Nonprofit State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Other Appliances & Electronics Commercial Lighting Lighting Maximum Rebate $200,000 per site, per fiscal year Program Info State Texas Program Type Utility Rebate Program Rebate Amount Tier 1: 125% of qualifying rebates Tier 2: 100% of qualifying rebates Tier 3: 50% of qualifying rebates Provider Austin Energy Austin Energy offers incentives for the construction and major renovation of commercial buildings within its service territory. The program rewards customers by using a tiered payment format, which provides incentives to

175

AEP Ohio - Commercial New Construction Energy Efficiency Rebate Program  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

AEP Ohio - Commercial New Construction Energy Efficiency Rebate AEP Ohio - Commercial New Construction Energy Efficiency Rebate Program (Ohio) AEP Ohio - Commercial New Construction Energy Efficiency Rebate Program (Ohio) < Back Eligibility Commercial Industrial Local Government Municipal Utility Nonprofit Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Cooling Home Weatherization Construction Commercial Weatherization Design & Remodeling Other Heat Pumps Appliances & Electronics Commercial Lighting Lighting Manufacturing Water Heating Maximum Rebate General: 50% of total project cost; Contact AEP Ohio Design Incentives: 50% of cost up to $50,000 Program Info State Ohio Program Type Utility Rebate Program Rebate Amount Custom: $0.08/kWh first year savings and $100/peak kW reduction

176

EA-1790: Construction and Operation of a Heterogeneous Feed Biorefinery  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

EA-1790: Construction and Operation of a Heterogeneous Feed EA-1790: Construction and Operation of a Heterogeneous Feed Biorefinery Enerkem Corporation Pontotoc, MS EA-1790: Construction and Operation of a Heterogeneous Feed Biorefinery Enerkem Corporation Pontotoc, MS SUMMARY The U.S. Department of Energy (DOE or the Department) is proposing to provide cost share funding to Enerkem, Inc (Enerkem) for the final design, construction, and operation of a proposed Heterogeneous Feed Biorefinery Project to be located in Pontotoc, Mississippi (hereafter referred to as the biorefinery or the proposed project). The biorefinery would use the dried and post-sorted biomass fraction of municipal solid waste (MSW) and wood biomass as feedstock. Enerkem's biorefinery would produce approximately 10 million gallons (38 million liters) of ethanol per year

177

DOE Announces $160 Million for Biorefinery Construction and Highlights New  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

$160 Million for Biorefinery Construction and $160 Million for Biorefinery Construction and Highlights New Agricultural Program to Promote Biofuels DOE Announces $160 Million for Biorefinery Construction and Highlights New Agricultural Program to Promote Biofuels February 22, 2006 - 12:11pm Addthis Funding Paves the Way for Diversifying America's Energy Mix DECATUR, IL - Energy Secretary Samuel W. Bodman, today announced $160 million in cost-shared funding over three years to construct up to three biorefineries in the United States. The Secretary made the announcement while visiting the Archer Daniels Midland Ethanol Plant, his second of four stops to promote the Advanced Energy Initiative announced by President Bush in his State of the Union address. Secretary Bodman also highlighted the United States Department of Agriculture's announcement today of almost $188

178

New Jersey SmartStart Buildings - New Construction and Retrofits |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

You are here You are here Home » New Jersey SmartStart Buildings - New Construction and Retrofits New Jersey SmartStart Buildings - New Construction and Retrofits < Back Eligibility Commercial Fed. Government Industrial Institutional Local Government Nonprofit Schools State Government Savings Category Heating & Cooling Commercial Heating & Cooling Heating Cooling Manufacturing Other Construction Heat Pumps Appliances & Electronics Commercial Lighting Lighting Water Heating Maximum Rebate General: incentives may be limited to $500,000 per utility account per year. Custom Measures: limited to lesser of $0.16/kWh or $1.60/therm saved annually; 50% of total costs; or buydown to a 1-year payback period Program Info Funding Source New Jersey Societal Benefits Charge (public benefits fund)

179

Graduate Certificate in Construction Engineering and Management  

E-Print Network (OSTI)

, Green Building Materials and Techniques, Sustainable Development and Construction Dr. Tewodros Ghebrab, Sustainable construction methods and materials in buildings and infrastructure systems, Engineering cost Management. Students choose two electives from: · Construction Safety and Risk Management, · Sustainable

Gelfond, Michael

180

NRC allows TVA to resume construction on unit 1  

SciTech Connect

The article very briefly describes the construction status of the Tennessee Valley Authority (TVA) Watts Bar Nuclear Plant unit 1. The project was halted by TVA for two years due to quality assurance issues. The US Nuclear Regulatory Commission approved resumption of work, noting that corrective actions were adequate. The status of other TVA reactors is also noted.

NONE

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Construction Timing and Expectations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Timing and Expectations Construction Timing and Expectations Construction Timing and Expectations October 16, 2013 - 5:07pm Addthis Creating a detailed construction schedule that allows all the project elements to be coordinated in a timely manner is fundamental to any successful construction project. The construction schedule should take into account that many tasks cannot be started before others are finished. It should also account for special schedule considerations related to renewable energy systems. Key elements of most new construction or major renovation projects include landscape, structural, architectural, mechanical, electrical, plumbing, communication systems, and renewable energy systems. Maintaining the highest quality of construction across all elements is fundamental to any

182

CRAD, Nuclear Facility Construction - Mechanical Equipment -...  

Office of Environmental Management (EM)

Nuclear Facility Construction - Mechanical Equipment - June 26, 2012 CRAD, Nuclear Facility Construction - Mechanical Equipment - June 26, 2012 June 26, 2012 Nuclear Facility...

183

Summary of Construction Equipment Tests and Activities  

NLE Websites -- All DOE Office Websites (Extended Search)

Equipment Tests A series of tests were conducted by the APS Construction Vibration Measurement Task Force using various pieces of construction equipment at the APCF...

184

FAQS Job Task Analyses - Construction Management | Department...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Management FAQS Job Task Analyses - Construction Management FAQS Job Task Analyses are performed on the Function Area Qualification Standards. The FAQS Job Task...

185

ALGORITHMS FOR CONSTRUCTING COMPARATIVE MAPS  

E-Print Network (OSTI)

. In this paper we present e#cient algorithms that help in automating this e#ort and o#er an explicit setALGORITHMS FOR CONSTRUCTING COMPARATIVE MAPS Debra S. Goldberg Susan McCouch Jon Kleinberg expert analysis, a simple linear algorithm, and a more complex stack­based algorithm. All three methods

Kleinberg, Jon

186

PHP: Constructs and Variables Introduction  

E-Print Network (OSTI)

PHP: Constructs and Variables Introduction This document describes: 1. the syntax and types of variables, 2. PHP control structures (i.e., conditionals and loops), 3. mixed-mode processing, 4. how to use one script from within another, 5. how to define and use functions, 6. global variables in PHP, 7

Vander Zanden, Brad

187

Materials Requirements for Pipeline Construction  

Science Journals Connector (OSTI)

...the same time, pipeline failure must be...the huge cost of repair. The first oil...where the initial pipeline construction cost...cost of a single repair can exceed C1M. TABLE 2. NORTH SEA PIPELINES grade max. water...

1976-01-01T23:59:59.000Z

188

Costume construction for digital characters  

E-Print Network (OSTI)

This paper attempts to gauge how effectively two top-of-the-line cloth simulation programs - MIRALab's MIRA Cloth and Alias/Wavefront's Maya Cloth - could be used by an artist trained in theatrical costume construction to create a digital costume...

Ellison, Barbara Lynn

2012-06-07T23:59:59.000Z

189

Foundation Year Aguideforinternationalstudents  

E-Print Network (OSTI)

Foundation Year Aguideforinternationalstudents #12;2 Contents TheFoundationYears 5 Engineering/Physics/Geophysics FoundationYear 6 ScienceFoundationYear 7 EntryRequirements 8 Moneymatters 10 Universitylife 10 The-termcommitmentandabig investmentinyourfuture.OurFoundationYearsare designedtoprepareyouforundergraduatestudyandto

Molinari, Marc

190

Foundation Year Aguideforstudents  

E-Print Network (OSTI)

Foundation Year Aguideforstudents #12;2 Contents TheFoundationYears 5 Engineering/Physics/Geophysics FoundationYear 6 ScienceFoundationYear 7 EntryRequirements 8 Moneymatters 10 Universitylife 10 TheUniversity 10 Thecity 10 Accommodation 10 Studentaccommodation MontefioreHouse4.. #12;3 OurFoundation

Anderson, Jim

191

Year 1 Year 2 Year 3 Year 4 Children's Hospital of  

E-Print Network (OSTI)

Year 1 Year 2 Year 3 Year 4 July General Pediatric Children's Hospital of Michigan High Risk Obstetrics Hutzel Women's Hospital Biochemical Genetics Lab/Metabolic Clinic Harper Hospital/ Children's Hospital of Michigan Reproductive Genetics Hutzel Women's Hospital August General Pediatric Children

Finley Jr., Russell L.

192

Alternative Fuels Data Center: Clean Construction USA  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Construction USA Construction USA to someone by E-mail Share Alternative Fuels Data Center: Clean Construction USA on Facebook Tweet about Alternative Fuels Data Center: Clean Construction USA on Twitter Bookmark Alternative Fuels Data Center: Clean Construction USA on Google Bookmark Alternative Fuels Data Center: Clean Construction USA on Delicious Rank Alternative Fuels Data Center: Clean Construction USA on Digg Find More places to share Alternative Fuels Data Center: Clean Construction USA on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type Clean Construction USA Clean Construction USA is a voluntary program that promotes the reduction of diesel exhaust emissions from construction equipment and vehicles by encouraging proper operations and maintenance, use of emissions-reducing

193

FALL SPRING FALL SPRING FALL SPRING FALL SPRING FALL Year 1 Year 2 Year 3 Year 4 Year 5  

E-Print Network (OSTI)

FALL SPRING FALL SPRING FALL SPRING FALL SPRING FALL Year 1 Year 2 Year 3 Year 4 Year 5 CORE W to meet BioE Engineering Elective Reqt. (c) ­ course used to meet ChE Techical Elective Reqt Revised 11

Lawrence, Rick L.

194

RFI for NC  

NLE Websites -- All DOE Office Websites (Extended Search)

Statement of Energy Service Requirements Statement of Energy Service Requirements & Format for Responses to a Request for Information GENERAL INFORMATION Document Type: Request for Information Posted Date: June 12, 2003 Original Response Date: June 26, 2003 Classification Code: 99-Miscellaneous-Renewable Energy/Renewable Energy Certificates (REC) DESCRIPTION The Federal Government is seeking interested parties to potentially supply renewable energy/REC in North Carolina behind the Duke Energy Service Territory, with the possibility of other locations as well. Requirements are estimated at approximately 30 million kWh. We are seeking Green-e certified (or the equivalent) REC, or renewable energy located close to North Carolina, but not necessarily within the state.

195

SRS Construction Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

SAVANNAH RIVER BUILDING TRADES SAVANNAH RIVER BUILDING TRADES MEDICAL SCREENING PROGRAM A NEEDS ASSESSMENT Submitted by The Center to Protect Workers' Rights on behalf of The Building and Construction Trades Dept., AFL-CIO and The Augusta, Georgia Building and Construction Trades Council In Cooperation with Duke University Medical Center Medlantic Research Institute United Brotherhood of Carpenters Health and Safety Fund University of Cincinnati Medical Center Zenith Administrators, Inc. June 23, 1998 Contents Summary and Response to Needs Assessment Questions , page i 1. Introduction and Rationale, 1 a. Aims, 1 b. Focus of Needs Assessment, 1 c. Organization, 1 d. Rationale for Program, 2 2. Need for Medical Evaluation and Notification, 3 a. Medical Surveillance, 3

196

Project Construction Team | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Project Construction Team Project Construction Team Project Construction Team October 16, 2013 - 5:06pm Addthis Photo of two men reviewing a large print document. Both men are wearing construction hats and bright vests. A construction team reviews plans for a 1.9 megawatt methane power generator for a U.S. Marine Corps landfill gas-to-energy project. Assembling the right project construction team is crucial and begins with the request for proposal (RFP). Federal agencies create and RFP for construction services using construction documents developed during the final stage of building design. Construction documents are the blueprints on which every project is built and will be used to generate bids for the construction phase of the project. Renewable energy will either be specified in detail in the

197

Year Report (FY 2000) Evaluation of uncertainties in satellite retrievals of aerosol  

E-Print Network (OSTI)

. Third Year Statement of Work 1. Construct clean aerosol data sets for the Mauna Loa (Hawaii), and Cheeka retrievals to the observed variability of ae

198

School construction in Sierra Leone  

E-Print Network (OSTI)

After years of British rule and a decade of civil unrest, rural communities in Sierra Leone were left with the residues of a colonial mentality and the psychological, physical and economic ravages of war. As a result, ...

Rodrguez-Noyola, Joanna

2009-01-01T23:59:59.000Z

199

Estimation of ship construction costs  

E-Print Network (OSTI)

Since the end of the Cold War naval procurement for the US Navy has seen a dramatic decrease. This decrease in defense spending has placed existing programs under more scrutiny than previous years. As a result there is ...

Miroyannis, Aristides

2006-01-01T23:59:59.000Z

200

Secretary Moniz's First Year  

Energy.gov (U.S. Department of Energy (DOE))

Check out our new interactive timeline to recap top moments from Energy Secretary Ernest Moniz's first year in office.

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Secretary Moniz's First Year  

Energy.gov (U.S. Department of Energy (DOE))

We're looking back at some of the biggest moments from Energy Secretary Ernest Moniz's first year in office.

202

Handbook of energy use for building construction  

SciTech Connect

The construction industry accounts for over 11.14% of the total energy consumed in the US annually. This represents the equivalent energy value of 1 1/4 billion barrels of oil. Within the construction industry, new building construction accounts for 5.19% of national annual energy consumption. The remaining 5.95% is distributed among new nonbuilding construction (highways, ralroads, dams, bridges, etc.), building maintenance construction, and nonbuilding maintenance construction. The handbook focuses on new building construction; however, some information for the other parts of the construction industry is also included. The handbook provides building designers with information to determine the energy required for buildings construction and evaluates the energy required for alternative materials, assemblies, and methods. The handbook is also applicable to large-scale planning and policy determination in that it provides the means to estimate the energy required to carry out major building programs.

Stein, R.G.; Stein, C.; Buckley, M.; Green, M.

1980-03-01T23:59:59.000Z

203

Year 1 Year 2 Anne 3 Anne 4 Year 5 Year 6 Year 7Year 3 Year 4 INGENIEUR POLYTECHNICIENINGENIEUR POLYTECHNICIEN  

E-Print Network (OSTI)

: Biology / Chemistry / Computer Science / Economics / Energy / Mechanics and Environmental Sciences / Mathematics and Applied Mathematics / Physics / Science, Technology & Society / Software Systems / Innovation Duration: 2 years - Possibility to be directly admitted to Year 2 Master of ScienceMaster of Science #12

Cengarle, María Victoria

204

Roadmap: Technology Construction Management Bachelor of Science [AT-BS-TECH-COMA  

E-Print Network (OSTI)

Roadmap: Technology ­ Construction Management­ Bachelor of Science [AT-BS-TECH-COMA] College;Roadmap: Technology ­ Construction Management­ Bachelor of Science [AT-BS-TECH-COMA] College of Applied of Applied Engineering, Sustainability and Technology Catalog Year: 2012­2013 Page 1 of 2 | Last Updated: 11

Sheridan, Scott

205

Best practices for system dynamics model design and construction with powersim studio.  

SciTech Connect

This guide addresses software quality in the construction of Powersim{reg_sign} Studio 8 system dynamics simulation models. It is the result of almost ten years of experience with the Powersim suite of system dynamics modeling tools (Constructor and earlier Studio versions). It is a guide that proposes a common look and feel for the construction of Powersim Studio system dynamics models.

Malczynski, Leonard A.

2011-06-01T23:59:59.000Z

206

Constructed Wetlands Research Group meeting Forth Suite, SEPA Riccarton Office, Edinburgh EH14 4AP  

E-Print Network (OSTI)

1 Minutes of Constructed Wetlands Research Group meeting Forth Suite, SEPA Riccarton Office. It was set up several years ago, particularly to support the implementation of constructed farm wetlands be obtained on disk from Neil McLean. Aberdeen Council is applying for funding to implement a wetland

Heal, Kate

207

Fifth Annual Report: 2008 Pre-Construction Eelgrass Monitoring and Propagation for King County Outfall Mitigation  

SciTech Connect

This is the fifth and final report in a series documenting progress of the pre-construction eelgrass restoration and mitigation activities for the proposed King County Brightwater marine outfall, discharging to Puget Sound near Point Wells, Washington. King County began implementing a multiyear eelgrass monitoring and restoration program in 2004, with the primary goal of returning intertidal and shallow subtidal habitat and eelgrass to pre-construction conditions, after construction of the outfall. Major eelgrass mitigation program elements include: a) pre-construction monitoring, i.e., documenting initial eelgrass conditions and degree of fluctuation over a 5 year period prior to construction, b) eelgrass transplanting, including harvesting, offsite propagation and stockpiling of local plants for post-construction planting, and c) post-construction planting and subsequent monitoring, occurring in 2009 and beyond. The overall program is detailed in the Eelgrass Restoration and Biological Resources Implementation Workplan (King County 2008).

Woodruff, Dana L.; Judd, Chaeli; Thom, Ronald M.; Sather, Nichole K.; Kaufmann, Ronald M.

2010-01-01T23:59:59.000Z

208

Strategic Plan for Patient Care and Prevention Facilities Design & Construction; Engineering Strategic Business Unit  

E-Print Network (OSTI)

The UTMDACC (University of Texas MD Anderson Cancer Center) will realize net savings of $1.6 million in five years by utilizing the PCPF-E SBU (Patient Care and Prevention Facilities Design & Construction; Engineering Strategic Business Unit...

Wangia, Peter Odongo

2009-07-31T23:59:59.000Z

209

Using a Business Process Model as a Central Organizing Construct for an Undergraduate Weather Forecasting Course  

Science Journals Connector (OSTI)

For the last five years, the author has employed a business process model as a central organizing construct for the senior-level Forecasting Techniques course at Embry- Riddle Aeronautical University's Daytona Beach, Florida, campus. The process model ...

John M. Lanicci

2012-05-01T23:59:59.000Z

210

Roseville Electric - Residential New Construction Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

New Construction Rebate Program New Construction Rebate Program Roseville Electric - Residential New Construction Rebate Program < Back Eligibility Commercial Construction Installer/Contractor Residential Savings Category Home Weatherization Commercial Weatherization Heating & Cooling Commercial Heating & Cooling Cooling Construction Design & Remodeling Sealing Your Home Ventilation Solar Buying & Making Electricity Program Info State California Program Type Utility Rebate Program Rebate Amount Energy Efficiency: $500/unit Solar PV: $2/watt Shade Trees: $30/tree Provider Roseville Electric Roseville Electric provides financial incentives to encourage local builders to construct energy efficient homes which incorporate solar resources. Participating builders can choose to build Preferred Homes or

211

Allocation Year Rollover  

NLE Websites -- All DOE Office Websites (Extended Search)

Allocation Year Rollover Allocation Year Rollover Allocation Year Rollover: 2013 to 2014 Note: Allocation Year 2013 (AY13) ends at 23:59:59 on Monday, January 13, 2014. AY14 runs from Tuesday, January 14, 2014 through Monday, January 12, 2015. Below are major changes that will go into effect with the beginning of AY14 on Tuesday, January 14, 2014. All times listed are PST. Scheduled System Downtimes There will be no service disruption during the allocation year rollover this year. Interactive and batch use will continue uninterrupted (except for "premium" jobs on Hopper; see below). Charging Across AY Boundary All batch jobs will continue running during the rollover. Time accrued before midnight will be charged to AY13 repos; time accrued after midnight will be charged to AY14 repos. Running batch jobs that are associated with

212

CONSTRUCTION MANAGEMENT QUALIFICATION STANDARD REFERENCE GUIDE  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Construction Management Qualification Standard Reference Guide August 2009 This page is intentionally blank. Table of Contents i LIST OF FIGURES ..................................................................................................................... iv LIST OF TABLES ........................................................................................................................ v ACRONYMS ................................................................................................................................ vi PURPOSE...................................................................................................................................... 1 SCOPE ...........................................................................................................................................

213

Soap and sand: construction tools for nanotechnology  

Science Journals Connector (OSTI)

...and sand: construction tools for nanotechnology Karen J. Edler Department of Chemistry...UK ( k.edler@bath.ac.uk ) Nanotechnology is the science of making and using...and sand: construction tools for nanotechnology. | Nanotechnology is the science...

2004-01-01T23:59:59.000Z

214

Nuclear Facility Construction - Structural Concrete, May 29,...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Nuclear Facility Construction - Structural Concrete, May 29, 2009 (HSS CRAD 64-15, Rev. 0) Nuclear Facility Construction - Structural Concrete, May 29, 2009 (HSS CRAD 64-15, Rev....

215

Landscape Design, Construction and Management Concentration  

E-Print Network (OSTI)

Landscape Design, Construction and Management Concentration Program of Study The Landscape for careers in the landscape and nursery industries, public gardens and arboreta. Opportunities include plant production, landscape design, construction and maintenance, marketing, management

Isaacs, Rufus

216

Constructing the ASCI computational grid  

SciTech Connect

The Accelerated Strategic Computing Initiative (ASCI) computational grid is being constructed to interconnect the high performance computing resources of the nuclear weapons complex. The grid will simplify access to the diverse computing, storage, network, and visualization resources, and will enable the coordinated use of shared resources regardless of location. To match existing hardware platforms, required security services, and current simulation practices, the Globus MetaComputing Toolkit was selected to provide core grid services. The ASCI grid extends Globus functionality by operating as an independent grid, incorporating Kerberos-based security, interfacing to Sandia's Cplant{trademark},and extending job monitoring services. To fully meet ASCI's needs, the architecture layers distributed work management and criteria-driven resource selection services on top of Globus. These services simplify the grid interface by allowing users to simply request ''run code X anywhere''. This paper describes the initial design and prototype of the ASCI grid.

BEIRIGER,JUDY I.; BIVENS,HUGH P.; HUMPHREYS,STEVEN L.; JOHNSON,WILBUR R.; RHEA,RONALD E.

2000-06-01T23:59:59.000Z

217

Berkeley Lab Site Construction Information  

NLE Websites -- All DOE Office Websites (Extended Search)

Old Town Demolition Old Town Demolition The demolition of Old Town Area Buildings 25A, 40, 41, 44, 44A, 44B, 52 and 52A has been completed to make way for the construction of the Solar Energy Research Center (SERC) and a General Purpose Laboratory (GPL). A phased plan has been developed to abate and demolish the remaining buildings within the Old Town Area, namely Buildings 4, 5, 7, 7C, 14, 16 and 16A. Subsurface remediation is subsequently planned to take place to address existing subsurface contamination. The demolition of the subject buildings is part of an overall plan to remediate and redevelop the Old Town area of the Lab. Critical Decision 1 (CD-1, Selection of Alternatives) was approved in October 2013 and $19.4M of funding has been approved for the characterization, deactivation, abatement, demolition and soil remediation

218

Stanford University Sustainable Design & Construction Program  

E-Print Network (OSTI)

March 14, 2014 Y2E2 Building, Room 292E 473 Via Ortega, Stanford, CA 94305 #12;Sustainable DesignStanford University Sustainable Design & Construction Program 2014-2015 Admitted Student Open House for sophisticated structural/construction engineers " Support Design-Build Firms, Design Firms, Construction Firms

Prinz, Friedrich B.

219

Construction Coordination Jan. 2014 March. 2014  

E-Print Network (OSTI)

­ Construct Hut · SU Diesel Storage Tanks ­ Install tanks & polishers, leak detection and power to system. #12 and repair sink holes · Coffee Hut ­ Utility Locate, Utility rough-in · SU Diesel Storage ­ BIO Submit ­ Construct Hut · SU Diesel Storage Tanks ­ Grading, UG elec. and slab construction #12;4 March 2014

Wechsler, Risa H.

220

Constructed wetlands for industry and commerce  

E-Print Network (OSTI)

23/05/2012 1 Constructed wetlands for industry and commerce Brian D'Arcy and Kate Heal Types drainage Resource recovery #12;23/05/2012 2 How do constructed wetlands improve water quality? Treatment of GHG emissions (N2O and CH4) Types of constructed wetland · Stormwater wetlands · Retention ponds

Heal, Kate

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Applied Science and Technology Task Order Fiscal Year 2008 Year...  

Energy Savers (EERE)

8 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2008 Year-End...

222

Applied Science and Technology Task Order Fiscal Year 2009 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

9 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2009 Year-End...

223

Applied Science and Technology Task Order Fiscal Year 2010 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

0 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2010 Year-End...

224

Applied Science and Technology Task Order Fiscal Year 2011 Year...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

1 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End Summary Report Applied Science and Technology Task Order Fiscal Year 2011 Year-End...

225

Project management knowledge and skills for green construction: Overcoming  

E-Print Network (OSTI)

for green buildings in the construction industry. In line with this, the Building and Construction Authority

Chaudhuri, Sanjay

226

Project Year Project Team  

E-Print Network (OSTI)

design goals for this project include low cost (less than $30 per paddle) and robustness. The projectProject Year 2001 Project Team Faculty: Allison Okamura, Mechanical Engineering, Whiting School Project Title Haptic Display of Dynamic Systems Audience 30 to 40 students per year, enrolled

Gray, Jeffrey J.

227

Project Year Project Team  

E-Print Network (OSTI)

-year section of the summer project will cost $1344.) This project will be measured by the CER surveys conductedProject Year 2005 Project Team Sean Greenberg, Faculty, Philosophy Department, Krieger School of Arts & Sciences; Kevin Clark, Student, Philosophy Department, Krieger School of Arts & Sciences Project

Gray, Jeffrey J.

228

Guide to Integrating Renewable Energy in Federal Construction: Project  

NLE Websites -- All DOE Office Websites (Extended Search)

Project Construction to someone by E-mail Project Construction to someone by E-mail Share Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Facebook Tweet about Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Twitter Bookmark Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Google Bookmark Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Delicious Rank Guide to Integrating Renewable Energy in Federal Construction: Project Construction on Digg Find More places to share Guide to Integrating Renewable Energy in Federal Construction: Project Construction on AddThis.com... Home Introduction Assessing Renewable Energy Options Planning, Programming, & Budgeting

229

Imagine Homes New Construction Occupied Test House  

SciTech Connect

This report summarizes the research findings of a long-term monitoring plan to evaluate the performance of an energy-efficient home constructed in 2010 in San Antonio, Texas. Monitoring of the energy use, energy generation, and temperature conditions for this project occurred between July 2010 and October 2011. The heating, ventilation, and air conditioning system effectively maintained acceptable temperatures and humidity levels in peak cooling and heating and non-peak operating periods. Discrepancies were found between modeled and actual energy use values, with actual space cooling energy use closest to the corresponding modeled value. Energy consumption predicted for lighting, appliances, and miscellaneous electrical loads was significantly higher than measured amounts, and energy consumption predicted for cooling was significantly lower than measured amounts. A high amount of the 1,600 kWh of PV-generated electricity produced annually was sent to the electric grid every month. The solar thermal DHW system was the main source of hot water for most of the year and performed well; during summer, electrical use by the backup system was rare.

Stecher, D.; Rapport, A.; Allison, K.

2013-07-01T23:59:59.000Z

230

Previous Year Awards  

NLE Websites -- All DOE Office Websites (Extended Search)

Awards Awards Previous Year Awards 2013 Allocation Awards This page lists the allocation awards for NERSC for the 2013 allocation year (Jan 8, 2013 through Jan 13, 2014). Read More » NERSC Initiative for Scientific Exploration (NISE) 2013 Awards NISE is a mechanism used for allocating the NERSC reserve (10% of the total allocation). In 2013 we made the second year of the two-year awards made in 2012, supplemented by projects selected by the NERSC director. Read More » Data Intensive Computing Pilot Program 2012/2013 Awards NERSC's new data-intensive science pilot program is aimed at helping scientists capture, analyze and store the increasing stream of scientific data coming out of experiments, simulations and instruments. Read More » 2012 Allocation Awards This page lists the allocation awards for NERSC for the 2012 allocation

231

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2002 Project Team Faculty: Louise Pasternack, Chemistry Department, Krieger School, Krieger School of Arts & Sciences Project Title Introductory Chemistry Lab Demonstrations Audience an interactive virtual lab manual that will facilitate understanding of the procedures and techniques required

Gray, Jeffrey J.

232

Buildings Energy Data Book: 1.3 Value of Construction and Research  

Buildings Energy Data Book (EERE)

2 2 Value of New Building Construction Relative to GDP, by Year ($2010 Billion) Value of New Construction Put in Place Bldgs. Percent of Residential Commercial (1) All Bldgs. (1) GDP Total U.S. GDP 1980 5.0% 1985 5.8% 1990 4.9% 1995 4.4% 2000 5.2% 2005 6.0% 2006 5.9% 2007 5.2% 2008 4.4% 2009 3.3% 2010 2.6% Note(s): Source(s): 129.8 247.7 377.4 14,660 1) New buildings construction differs from Table 1.3.2 by excluding industrial building construction. DOC, Current Construction Reports: Value of New Construction Put in Place, C30, Aug. 2003, Table 1 for 1980-1990; DOC, Annual Value of Private Construction Put in Place, August 2008 for 1995-2000; DOC, Annual Value of Private Construction Put in Place, February 2012 for 2002-2010; DOC, Annual Value of Public Construction Put in Place, August 2008 for 1995-2000; DOC, Annual Value of Public Construction Put in Place, February 2012 for 2002-2010;

233

Consolidated Construction Consortium Ltd | Open Energy Information  

Open Energy Info (EERE)

Ltd Ltd Jump to: navigation, search Name Consolidated Construction Consortium Ltd Place Chennai - 600 004., Tamil Nadu, India Zip 600004 Sector Biomass, Solar Product Chennai-based construction and engineering firm. The firm is planning to foray into solar and biomass energy via its subsidiary CCCL Infrastructure. References Consolidated Construction Consortium Ltd[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. Consolidated Construction Consortium Ltd is a company located in Chennai - 600 004., Tamil Nadu, India . References ↑ "Consolidated Construction Consortium Ltd" Retrieved from "http://en.openei.org/w/index.php?title=Consolidated_Construction_Consortium_Ltd&oldid=34386

234

Interior Construction Renovations | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Interior Construction Renovations Interior Construction Renovations Interior Construction Renovations October 16, 2013 - 4:53pm Addthis Renewable Energy Options for Interior Construction Renovations Daylighting Passive Solar Heating Solar Water Heating (SWH) Solar Ventilation Air Preheating When a renovation realigns the interior space in a Federal building, proper design of the new space can take advantage of a number of energy technologies. Primarily, the new interior construction should be developed in conjunction with daylighting design to maximize the use of natural light in the space and minimize glare or other lighting issues that affect performance. Passive solar heating, solar water heating (SWH), solar ventilation air preheating, and energy efficiency technologies can also be considered for interior construction renovations.

235

Onsite Wastewater Treatment Systems: Constructed Wetlands  

E-Print Network (OSTI)

Two-compartment septic tank Soil absorption field Constructed wetland Onsite wastewater treatment systems Constructed wetlands Natural wetlands generally have visible water in the system. However, for those at homes, the water flows beneath... the media surface, which limits contact between residents and wastewater. The constructed wetland waste- water treatment system has three main components that work together to purify wastewater: ? A septic tank, which is an en- closed watertight...

Lesikar, Bruce J.

2008-10-23T23:59:59.000Z

236

OMEGA EP Construction - Laboratory for Laser Energetics  

NLE Websites -- All DOE Office Websites (Extended Search)

Construction - Laboratory for Laser Energetics Laboratory for Laser Energetics Logo Search Home Around the Lab Past Issues Past Quick Shots About Office of the Director Map to LLE...

237

Catawba County- Green Construction Permitting Incentive Program  

Energy.gov (U.S. Department of Energy (DOE))

Catawba County is providing incentives to encourage the construction of sustainably built homes and commercial buildings. Rebates on permit fees and plan reviews are available for certain...

238

Example Cost Codes for Construction Projects  

Directives, Delegations, and Requirements

This chapter provides an example outline of cost items and their corresponding cost codes that may be used for construction projects.

1997-03-28T23:59:59.000Z

239

Fermilab | Illinois Accelerator Research Center | Construction...  

NLE Websites -- All DOE Office Websites (Extended Search)

Construction Progress 08142013 photo photo 04152013 photo 04012013 photo 03262013 photo 03192013 photo 03112013 photo 03042013 photo 02252013 photo 02182013 photo...

240

ODEQ - Construction Stormwater Application and Forms Manual ...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: ODEQ - Construction Stormwater Application and Forms ManualPermittingRegulatory...

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

ODEQ - Construction Stormwater Best Management Practices Manual...  

Open Energy Info (EERE)

search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: ODEQ - Construction Stormwater Best Management Practices ManualPermittingRegulatory...

242

Construction Contractor Checklist | Argonne National Laboratory  

NLE Websites -- All DOE Office Websites (Extended Search)

Construction Contractor Checklist For small businesses seeking contracting opportunities with Argonne in the constructiondemolition field, please be sure you have taken the...

243

Construction project scheduling problem with uncertain resource ...  

E-Print Network (OSTI)

... on-going activities. 7 Conclusions and future work .... constrained construction scheduling, Journal of Computing in Civil Engineering, 13(3),. 207-216. [23] Liu...

2004-06-01T23:59:59.000Z

244

Alternative Energy in New State Construction  

Energy.gov (U.S. Department of Energy (DOE))

Texas requires state government departments to compare the cost of providing energy alternatives for new and reconstructed state government buildings and for certain construction or repair to...

245

Wastewater Construction and Operation Permits (Iowa)  

Energy.gov (U.S. Department of Energy (DOE))

These regulations describe permit requirements for the construction and operation of facilities treating wastewater, and provide separation distances from other water sources.

246

Hawaii Well Construction & Pump Installation Standards Webpage...  

Open Energy Info (EERE)

Webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Hawaii Well Construction & Pump Installation Standards Webpage Abstract This webpage provides...

247

Colorado Air Pollution Control Division - Construction Permits...  

Open Energy Info (EERE)

Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Colorado Air Pollution Control Division - Construction Permits Forms and Air Pollutant Emission...

248

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM&R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA`s power system. This document -- the 1992 OM&R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction`s critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA`s ability to accomplish its OM&R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

249

Calendar Year 1996 | Department of Energy  

NLE Websites -- All DOE Office Websites (Extended Search)

6 6 Calendar Year 1996 Documents marked with the * are published in Adobe PDF format. 1996-11-21 - Report IG-0398: Special Report on the Audit of the Management of Department of Energy Construction Projects 1996-11-15 - Report WR-B-97-03: Audit of Groundwater Monitoring at Hanford 1996-11-07 - Report WR-B-97-02: Audit of Bus Service Subsidies at the Idaho National Engineering Laboratory 1996-11-06 - Report WR-B-97-01: Audit of Electrical System Construction Projects at the Nevada Operations Office 1996-10-22 - Report ER-B-97-01: Audit of Economic Development Grants and a Cooperative Agreement with East Tennessee Not-For-Profit Organizations 1996-10-13 - Report INS-9601: Report on the Intelligence Oversight Inspection of the Special Technologies Laboratory 1996-10-07 - Report IG-0397:*

250

WHICH HYDRAULIC MODEL TO USE IN VERTICAL FLOW CONSTRUCTED WETLANDS?  

E-Print Network (OSTI)

WHICH HYDRAULIC MODEL TO USE IN VERTICAL FLOW CONSTRUCTED WETLANDS? Ania Morvannoua , Nicolas-equilibrium model, preferential flow path, vertical flow constructed wetlands INTRODUCTION Constructed wetlands (CWs

Paris-Sud XI, Université de

251

North Carolina State University, Campus Box 7409, Raleigh, NC 27695 | 919-513-7831 | www.cleantransportation.org 9/17/12 Advancing Clean Energy for a Sustainable Economy  

E-Print Network (OSTI)

.cleantransportation.org 9/17/12 Advancing Clean Energy for a Sustainable Economy Clean Transportation | Campus Box 7409, Raleigh, NC 27695 | 919-513-7831 | www.cleantransportation.org Clean Fuel Advanced Technology (CFAT) 2010-2012: Iredell County Sheriff Propane (LPG) Vehicle Summary Clean Fuel Advanced Technology (CFAT) Project 2006

252

Influence of Ge content and annealing conditions on the PL properties of nc-Si1?xGex embedded in SiO2 matrix in weak quantum confined regime  

Science Journals Connector (OSTI)

Abstract Fabrication of Si (nc-Si), Ge (nc-Ge), and Si1?xGex (nc-Si1?xGex) nanocrystals embedded in SiO2 matrix is achieved by thermal annealing of magnetron-sputtered thin films. Effects of annealing conditions, namely duration and temperature, as well as Ge content on the photoluminescence properties are investigated. Origin and evolution of the photoluminescence signal in the weak quantum confinement regime are discussed. It is found that photoluminescence signals can be decomposed into four Gaussian peaks originating from Ge-related radiative defects located at the sub-oxide (GeOx), either inside the matrix or at the interface region (peak M), nc-Si1?xGex/SiO2 interface-related localized states (peak I), localized states in the amorphous Si1?xGex bandgap (peak A) and quantum confinement of excitons in small nanocrystals (peak Q). The role of small and large nanocrystals in the photoluminescence mechanism is investigated by varying the mean nanocrystal size from 3nm to 23nm (from strong to weak quantum confined regime). Our results demonstrate that the quantum confinement effect in Ge nanocrystals manifests though spectral blueshift due to increase in Ge content. We also propose that the decreasing photoluminescence signal intensity with an increase in Ge content may originate from Ge-related nonradiative Pb centers.

Evrin Tu?ay; Serim Ilday; Ra?it Turan; Treje G. Finstad

2014-01-01T23:59:59.000Z

253

Construction of an Electric Vehicle Implemented in Egypt  

E-Print Network (OSTI)

The design and manufacture of electric vehicles is becoming important with the rising cost of petrol, and the effect of emissions from petrol powered vehicles on our environment. Operating a battery electric vehicle will eliminate emissions inside our cities and reduce our dependence on oil. The number of electric vehicles on the roads is increasing every year as people become more environmentally conscious and gasoline prices are volatile. This study produces a design and construction a battery electric vehicle, and describes the process of constructing and testing of an electric vehicle. This design comprises many steps from choosing the vehicle design, sizing a motor, and the type of batteries used. Finally, a set of experimental results which showing the performance of the designed electric vehicle under certain conditions were conducted. Key Words: electric vehicle, performance, experimental work, lead-acid battery and DC electric motor.

unknown authors

254

APS team works smarter, cuts substation construction costs by 36%  

SciTech Connect

An aggressive, cost-cutting, team of T D employees at Arizona Public Service Co (APS) is building a new distribution substation in Phoenix for less than half the original cost that APS planners had calculated for the project's land, labor and materials. Scheduled for service in June of this year, APS analysts had originally projected land, labor and materials costs for the 20-MVA Bell substation at nearly $1.7-million-not including major equipment such as transformers, circuit breakers, and switches. However, after studying the project, an empowered APS crew was able to slash 36% off the original estimate-more than $610,000. What's more, APS spokesmen say that its new approach to substation construction and design has given its engineers and construction crews a laundry list of additional ideas to try out on future substation ventures. 4 figs., 1 tab.

Not Available

1993-05-01T23:59:59.000Z

255

Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

June 7, 2011 June 7, 2011 Recovery Act Supports Construction of Site's Largest Groundwater Treatment Facility RICHLAND, Wash. - Construction of the largest ground- water treatment facility at the Hanford Site - a major American Recovery and Reinvestment Act project - is on schedule and more than 70 percent complete. Recovery Act workers with DOE contractor CH2M HILL Plateau Remediation Company are on pace to finish con- struction of the 200 West Groundwater Treatment Facil- ity this year. Funding for the project comes from the $1.6 billion the Richland Operations Office received from the Recovery Act. The 52,000-square-foot facility will pump contaminated water from the ground, remove contaminants with a combination of treatment technologies, and return clean water to the aquifer. The system will have the capacity to

256

Project Year Project Title  

E-Print Network (OSTI)

operators, matrix indexing, vector computations, loops, functions, and plotting graphs, among others basic arithmetic operators, matrix indexing, and vector computations in MATLAB. After creatingProject Year 2011-2012 Project Title Online Tutorial for MATLAB Project Team Eileen Haase, Whiting

Gray, Jeffrey J.

257

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2005 Project Team Krysia Hudson, Faculty, School of Nursing, Undergraduate Instruction for Educational Resources Project Title Enhanced Web-based Learning Environments for Beginning Nursing Students (e.g., demonstrations of procedures or tasks) into the WBL systems, it will be possible to increase

Gray, Jeffrey J.

258

Project Year Project Title  

E-Print Network (OSTI)

that incorporate video taped procedures for student preview. Solution This project will create videos for more to study the procedure and techniques before coming to class. Our previous fellowship project addressedProject Year 2009 Project Title Enhancing Biology Laboratory Preparation through Video

Gray, Jeffrey J.

259

Project Year Project Team  

E-Print Network (OSTI)

, there is no resource available to view the procedure before class. Solution The purpose of this project is to capture available to view the procedure before class. The purpose #12;of this project is to capture variousProject Year 2007 Project Team Kristina Obom, Faculty, Advanced Academic Programs, Krieger School

Gray, Jeffrey J.

260

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2002 Project Team Faculty: Michael McCloskey, Cognitive Science/Neuroscience, Krieger of Arts & Sciences Project Title Cognitive Neuropsychology Audience The initial audience to access. The current procedure calls for individual students or researchers to contact the faculty member

Gray, Jeffrey J.

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Project Year Project Title  

E-Print Network (OSTI)

Project Year 2011-2012 Project Title Using M-Health and GIS Technology in the Field to Improve into teams and having each team use a different m-health data collection tool (e.g., cellular phones, smart health patterns. The Tech Fellow, Jacqueline Ferguson, will assist in creating an m-health project

Gray, Jeffrey J.

262

Project Year Project Team  

E-Print Network (OSTI)

Project Year 2002 Project Team Faculty: Gregory Hager, Computer Science, Whiting School of Engineering Fellow: Alan Chen, Biomedical Engineering, Whiting School of Engineering Project Title Robotics is complicated, time-consuming, and costly, making a robot for an introductory-level class is not practical

Gray, Jeffrey J.

263

Project Year Project Title  

E-Print Network (OSTI)

the cost of the project to labor only. The efficacy of the examples will be assessed through their useProject Year 2012-2013 Project Title Sight-Reading at the Piano Project Team Ken Johansen, Peabody) Faculty Statement The goal of this project is to create a bank of practice exercises that student pianists

Gray, Jeffrey J.

264

Project Year Project Title  

E-Print Network (OSTI)

Project Year 2013-2014 Project Title German Online Placement Exam Project Team Deborah Mifflin to increased cost. As well, it lacked listening comprehension, writing and speaking components providing support, we will use Blackboard for this project. The creation will require numerous steps

Gray, Jeffrey J.

265

Project Year Spring 2009  

E-Print Network (OSTI)

Project Year Spring 2009 Project Title A Database of Film and Media History and Aesthetics Part 2 experience with colleagues, they were eager to participate in expanding the database to include clips or they simply don't have the time, or both. Solution: The development of a user-friendly database of clips would

Gray, Jeffrey J.

266

Construction Safety Advisory Committee- Membership Roster  

Energy.gov (U.S. Department of Energy (DOE))

CSAC members shall consist of DOE and DOE contractor employees whose normal job duties include program management or operational direction of construction safety. Members shall be nominated by their management based on their construction safety expertise and on the needs of the committee.

267

New method for classifying construction information  

E-Print Network (OSTI)

general classification system is felt more than ever by the construction professionals. The purpose of this study is to analyze the major classification systems of construction works, such as MasterFormat or UniFormat used in the United States, and SfB...

Lee, Sunku

2012-06-07T23:59:59.000Z

268

Construction Design anD Materials  

E-Print Network (OSTI)

Firewise Construction Design anD Materials #12;Firewise Construction Design anD Materials Peter 2000. Peter`s practice included many homes and other buildings in the Interface. His design empha- sized the integration of fire-resistive elements with other important design principles such as proper

269

Survey Constructive nonlinear control: a historical perspective  

Science Journals Connector (OSTI)

In the early days of nonlinear control theory most of the stability, optimality and uncertainty concepts were descriptive rather than constructive. This survey describes their 'activation' into design tools and constructive procedures. Structural properties ... Keywords: Applications, Design tools, Feedback passivation, Inverse optimality, Recursive procedures, Robust stabilization

Petar Kokotovi?; Murat Arcak

2001-05-01T23:59:59.000Z

270

NRC Construction Light Source Flicker: What We  

E-Print Network (OSTI)

frequency] (CFF) ·Health - World Health Organization (1947): · ...a state of complete physical, mental Handbook: Reference & Application (9th Ed.), 2000, p. 3-20 #12;NRC Construction Flicker Effects 1;NRC Construction Flicker Problem 2 ·Does it matter what light source produces the flicker

California at Davis, University of

271

Bicrossproduct construction versus Weyl-Heisenberg algebra  

E-Print Network (OSTI)

We are focused on detailed analysis of the Weyl-Heisenberg algebra in the framework of bicrossproduct construction. We argue that however it is not possible to introduce full bialgebra structure in this case, it is possible to introduce non-counital bialgebra counterpart of this construction. Some remarks concerning bicrossproduct basis for kappa-Poincare Hopf algebra are also presented.

A. Borowiec; A. Pacho?

2012-04-26T23:59:59.000Z

272

Constructive membership predicates as index James Caldwell  

E-Print Network (OSTI)

. This interpretation of membership predicates as index types arises completely naturally in the constructive setting2Constructive membership predicates as index types James Caldwell and Josef Pohl Department, membership predicates over recursive types are inhabited by terms indexing the elements that satisfy

Caldwell, James

273

Construction Documents (100%) | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Documents (100%) Construction Documents (100%) Construction Documents (100%) October 16, 2013 - 4:38pm Addthis Construction documents (100%) represent the final set of drawings that will be issued for contractors to bid on. At this point, all architectural and engineering systems have been reviewed and designed to ensure that project goals are being met. A final review with all members participating in previous reviews should be planned to ensure all information from previous design reviews have been incorporated into the construction documents and all other renewable energy integration issues have been resolved before being issued for bid. At this point, it is expected there will be few, if any, changes to the overall building design. The planned renewable energy technologies will

274

GC GUIDANCE ON MINOR CONSTRUCTION THRESHOLDS  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

GUIDANCE GUIDANCE ON MINOR CONSTRUCTION THRESHOLDS We have been asked about how the Department implements what is known as the "minor construction threshold," which limits the amount of certain funds that can be spent on minor construction projects that are not specifically authorized by law. This Guidance is intended to clarify both the applicable law and Department policy. The Secretary's authority to carry out construction projects is subject to several limitations in the Atomic Energy Defense Act (AEDA) on the use of funds appropriated for DOE national security programs. One of these limitations, the "minor construction threshold," caps the amount of "operation and maintenance funds" or "facilities and "infrastructure funds authorized by a DOE

275

Ruihua Construction Corporation RHC | Open Energy Information  

Open Energy Info (EERE)

Ruihua Construction Corporation RHC Ruihua Construction Corporation RHC Jump to: navigation, search Name Ruihua Construction Corporation (RHC) Place Shenzhen, Guangdong Province, China Zip 518040 Sector Solar Product A construction company whose solar subsidiary Resun Solar is constructing a building-integrated PV (BIPV) installation for the Olympics. Coordinates 22.546789°, 114.112556° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":22.546789,"lon":114.112556,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

276

Amchitka Former Workers, Construction Worker Screening Projects |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Amchitka Former Workers, Construction Worker Screening Projects Amchitka Former Workers, Construction Worker Screening Projects Amchitka Former Workers, Construction Worker Screening Projects Project Name: Building Trades National Medical Screening Program Covered DOE Site: Amchitka Worker Population Served: All workers Principal Investigator: Knut Ringen, DrPH, MHA, MPH Toll-free Telephone: (800) 866-9663 Website: http://www.btmed.org This project is intended to provide free medical screening to former workers in the building trades (construction workers). The screening targets health problems resulting from exposures, including asbestos, beryllium, cadmium, chromium, lead, mercury, noise, radiation, silica and/or solvents. The project is being carried out by a large group led by CPWR - The Center for Construction Research and Training, an applied

277

Through the years  

NLE Websites -- All DOE Office Websites (Extended Search)

Through the years Through the years Early 1960s Researchers at PNL (now called PNNL) developed the standards and devices for setting and measuring radiation doses received by nuclear industry work- ers. Tens of thousands of people, including children, have been mea- sured by whole-body counters since the 1960s to relate their physical content of radioactive materials to sources such as food and water. 1960s PNL formulated the first use of a digital computer for complete process control of a mass spectrometer. Mid-1960s PNL devised a computer code, called COBRA for COolant Boiling in Rod Arrays, which allowed for three-dimensional, multiphase hydrothermal modeling of reactor and other complex systems. 1967 PNL researchers continued the fundamental scientific and

278

Oak Ridge Facilities Construction | Y-12 National Security Complex  

NLE Websites -- All DOE Office Websites (Extended Search)

Facilities ... Oak Ridge Facilities Construction Work in wet and mud was common during the construction of Oak Ridge facilities...

279

Sustainable Hazard Resistant Construction Using Indigenous Materials -Bamboo Construction in Darjeeling and Sikkim-  

E-Print Network (OSTI)

Sustainable Hazard Resistant Construction Using Indigenous Materials -Bamboo Construction July 2014 4pm A206a � School of Engineering ABSTRACT Interest in sustainable construction materials material resources, such as bamboo, are an integral part of sustainable development. The use of natural

Davies, Christopher

280

40 Years of Discovery  

SciTech Connect

History is most interesting when seen through the eyes of those who lived it. In this 40th anniversary retrospective of bioscience research at Lawrence Livermore National Laboratory, we've asked 19 scientists to share their personal recollections about a major accomplishment in the program's history. We have not tried to create a comprehensive or seamless story. Rather, we've attempted to capture the perspectives of key individuals, each of whom worked on a research program that met significant milestones. We have focused particularly on programs and accomplishments that have shaped the current Biology and Biotechnology Research Program (BBRP). In addition, we have included a timeline of biosciences at LLNL, a history of the directorate that appeared in the Laboratory's magazine, ''Science & Technology Review'', in 2002, and a list of bioscience-related articles that have appeared over the years in ''Science & Technology Review and its predecessor, Energy & Technology Review''. The landscape of biological science today is stunningly different from 40 years ago. When LLNL bioscience began in 1963, we knew about the structure of DNA and that it was the carrier of genetic information. However, it would be another year before scientists would understand how DNA codes for the production of proteins and more than a decade before the earliest DNA sequence would be known. It is sometimes difficult to remember that it was only 15 years ago that the polymerase chain reaction, a synthetic method to amplify pieces of DNA was developed, and that only within the last half-dozen years has sequence data for entire organisms begun to be available. In this publication, we have tried to capture some of the landmark and seminal research history: radiation effects studies, which were a major reason for founding the biological research program, and flow sorting and chromosome painting, which dramatically changed our ability to study DNA damage and enabled the creation of chromosome-specific clone libraries, a key step toward sequencing the human genome. Several histories relate to the Human Genome Project itself and surrounding technologies, and several to long-standing research themes such as DNA repair, food mutagens, and reproductive biology. Others describe more recent developments such as computational biology, health-care technologies, and biodefense research.

Weinstein, B; Heller, A

2003-07-08T23:59:59.000Z

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

Language constructs for modular parallel programs  

SciTech Connect

We describe programming language constructs that facilitate the application of modular design techniques in parallel programming. These constructs allow us to isolate resource management and processor scheduling decisions from the specification of individual modules, which can themselves encapsulate design decisions concerned with concurrence, communication, process mapping, and data distribution. This approach permits development of libraries of reusable parallel program components and the reuse of these components in different contexts. In particular, alternative mapping strategies can be explored without modifying other aspects of program logic. We describe how these constructs are incorporated in two practical parallel programming languages, PCN and Fortran M. Compilers have been developed for both languages, allowing experimentation in substantial applications.

Foster, I.

1996-03-01T23:59:59.000Z

282

Construction progress of the RHIC electron lenses  

SciTech Connect

In polarized proton operation the RHIC performance is limited by the head-on beam-beam effect. To overcome this limitation two electron lenses are under construction. We give an overview of the construction progress. Guns, collectors and the warm electron beam transport solenoids with their power supplies have been constructed. The superconducting solenoids that guide the electron beam during the interaction with the proton beam are near completion. A test stand has been set up to verify the performance of the gun, collector and some of the instrumentation. The infrastructure is being prepared for installation, and simulations continue to optimize the performance.

Fischer W.; Altinbas, Z.; Anerella, M.; Beebe, E.; et al

2012-05-20T23:59:59.000Z

283

Construction Worker Screening Projects | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Worker » Former Worker Program » Worker » Former Worker Program » Construction Worker Screening Projects Construction Worker Screening Projects Sites listed below are the primary DOE sites served. Construction workers from DOE sites not listed below are covered by the Building Trades National Medical Screening Program (BTMed). Additional information regarding BTMed can be found on their website or by calling 1-800-866-9663. Alaska: Amchitka California: Lawrence Berkeley National Laboratory Lawrence Livermore National Laboratory Sandia National Laboratories (Livermore, CA) Colorado: Rocky Flats Florida: Pinellas Idaho: Argonne National Laboratory-West Idaho National Laboratory Illinois: Argonne National Laboratory Fermi National Accelerator Laboratory Iowa: Ames Laboratory Iowa Army Ammunition Plant

284

,"Projected Year Base","Year","Summer",,,"Eastern Power Grid...  

U.S. Energy Information Administration (EIA) Indexed Site

2009 " ,"(Megawatts and Percent)" ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid",,,"Texas Power Grid",,,"Western Power Grid" ,,,"Contiguous...

285

,"Projected Year Base","Year","Summer",,,"Eastern Power Grid...  

U.S. Energy Information Administration (EIA) Indexed Site

2008 " ,"(Megawatts and Percent)" ,"Projected Year Base","Year","Summer",,,"Eastern Power Grid",,,"Texas Power Grid",,,"Western Power Grid" ,,,"Contiguous...

286

Third Annual Report: 2006 Pre-Construction Eelgrass Monitoring and Propagation for King County Outfall Mitigation  

SciTech Connect

King County proposes to build a new sewer outfall discharging to Puget Sound near Point Wells, Washington. Construction is scheduled for 2008. The Point Wells site was selected to minimize effects on the nearshore marine environment, but unavoidable impacts to eelgrass (Zostera marina) beds are anticipated during construction. To mitigate for these impacts and prepare for post-construction restoration, King County began implementation of a multi-year eelgrass monitoring and restoration program in 2004, with the primary goal of returning intertidal and shallow subtidal habitat and eelgrass to pre-construction conditions. Major program elements are a) pre-construction monitoring, i.e., documenting initial eelgrass conditions and degree of fluctuation over 5 years prior to construction, b) eelgrass transplanting, including harvesting, offsite propagating and stockpiling of local plantstock, and post-construction planting, and c) post-construction monitoring. The program is detailed in the Eelgrass Restoration and Biological Resources Implementation Workplan (King County 2006). This report describes calendar year 2006 pre-construction activities conducted by Pacific Northwest National Laboratory (PNNL) in support of King County. Activities included continued propagation of eelgrass shoots and monitoring of the experimental harvest plots in the marine outfall corridor area to evaluate recovery rates relative to harvest rates. Approximately 1500 additional shoots were harvested from the marine outfall corridor in August 2006 to supplement the plants in the propagation tank at the PNNL Marine Sciences Laboratory in Sequim, Washington, bringing the total number of shoots to 4732. Eelgrass densities were monitored in the five experimental harvest plots established in the marine outfall corridor. Changes in eelgrass density were evaluated in year-to-year comparisons with initial harvest rates. Net eelgrass density decreased from 2004 post-harvest to 2006 in all plots, despite density increases observed in 2005 in some plots and at some harvest rates. Eelgrass densities within individual subplots were highly variable from year to year, and the change in density in any interannual period did not correlate to the initial 2004 harvest rate. Continued monitoring should help project managers determine an optimum harvest rate that supports rapid recovery of donor eelgrass beds.

Woodruff, Dana L.; Southard, Susan S.; Cullinan, Valerie I.; Kohn, Nancy P.; Anderson, Michael G.; Vavrinec, John

2007-02-01T23:59:59.000Z

287

The role of construction education: a study to evaluate the success of construction education programs in serving the current and future needs of the construction profession  

E-Print Network (OSTI)

prevailing attitudes toward construction education, the role of construction education within the profession, and the success of construction education programs in serving the current and future needs of the profession. A survey questionnaire was used as a...

Brock, Alan Joseph

1988-01-01T23:59:59.000Z

288

MEMORANDUM FROM: PAUL BOSCO AND CONSTRUCTION MANAGEMENTISENIOR REAL  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

15 2009 15 2009 MEMORANDUM FROM: PAUL BOSCO AND CONSTRUCTION MANAGEMENTISENIOR REAL PROPERTY OFFICER SUBJECT: FY 2009 Federal Real Property Reporting Requirement The attached document provides implementing instructions for FY 2009 real property inventory reporting. Please distribute it to the appropriate elements of your organization. This effort is central to the Department's efforts toward removal from the GAO High Risk List. As in previous years, the Department will use the data in the Facility Information Management System (FIMS) to report to GSA. There is very little change in reporting requirements h m last year. The attached guidance contains detailed instructions for each of the requireddata elements. Please ensure that the requireddata is entered into FIMS by November 13,2009, so that the

289

Draft 1992 : Operations, Maintenance, and Replacement 10-Year Plan.  

SciTech Connect

Two years ago, BPA released its first-ever Operations, Maintenance, and Replacement (OM R) 10-Year Plan. That effort broke new ground and was an extensive look at the condition of Operations, Maintenance, and Replacement on BPA's power system. This document -- the 1992 OM R 10-Year Plan -- uses that original plan as its foundation. It takes a look at how well BPA has accomplished the challenging task set out in the 1990 Plan. The 1992 Plan also introduces the Construction Program. Construction's critical role in these programs is explored, and the pressures of construction workload -- such as the seasonal nature of the work and the broad swings in workload between projects and years -- are discussed. The document then looks at how situations may have changed with issues explored initially in the 1990 Plan. Importantly, this Plan also surfaces and explains some new issues that threaten to impact BPA's ability to accomplish its OM R workload. Finally, the document focuses on the revised strategies for Operations, Maintenance, Replacement, Construction, and Environment for the 1992 to 2001 time period, including the financial and human resources needed to accomplish those strategies.

United States. Bonneville Power Administration.

1992-05-01T23:59:59.000Z

290

Master of Architecture Plan (180 credits) Year 1 (35 credits)  

E-Print Network (OSTI)

Master of Architecture Plan (180 credits) Year 1 (35 credits) Fall (16 credits) Spring (19 credits) ARCH 108 Arch. Foundations I (4) ARCH 109 Arch. Foundations II (6) ARCH 103 Intro. to Architecture (3 626 Construction Systems & Assemblies (3) ARCH 530 Environmental Systems I (3) ARCH 541 Global History

291

Oak Ridge Construction Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

CONSTRUCT ON WORKERS CONSTRUCT ON WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT* December, 1997 Dr. Eula Bingharn, P.1. University of Cincinnati *Ts revised needs assessment reflects an a4fressçs comments from the NIOSH review of our original needs assessment, July, 1997. SURVEILLANCE OF FORMER CONSTRUCTION WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT* December, 1997 * * Dr. Eula Bingham, P.1. University of Cincinnati * * *Thjs rerised needs assessment reflects and addtesses comments from the NIOSH review of our original needs assessment, July, 1997! * SURVEILLANCE OF FORMER CONSTRUCTION WORKERS AT OAK RIDGE RESERVATION: A REVISED NEEDS ASSESSMENT Principal Investigator Eula Bingham Introduction - Need for Establishing Medical Evaluation and Page Notification 1 a. Medical Surveillance

292

IWTU Construction Workers Set Largest Process Vessel  

NLE Websites -- All DOE Office Websites (Extended Search)

IWTU Construction Workers Set Largest Process Vessel IWTU Construction Workers Set Largest Process Vessel Click on image to enlarge Construction of the Integrated Waste Treatment Unit (IWTU) took a major step forward on Sept. 2, 2009 as crews lifted into place the largest of the six process vessels that will be used to treat radioactive liquid waste stored at the site. The IWTU will use a steam reforming process to solidify the waste for eventual shipment out of Idaho. The vessel and its skid, or framework, were constructed at Premier Technologies in Blackfoot. (Premier is the main small business partner for CH2M-WG Idaho (CWI), the contractor for DOE's Idaho Cleanup Project.) The Carbon Reduction Reformer vessel and skid weigh approximately 60 tons (120,000 lbs.). Because of the weight of the vessel and the location of the

293

Digital Construction Platform: A Compound Arm Approach  

E-Print Network (OSTI)

We introduce a novel large-scale Digital Construction Platform (DCP) for on-site sensing, analysis, and fabrication. The DCP is an in-progress research project consisting of a compound robotic arm system comprised of a ...

Spielberg, Nathan A.

2014-01-01T23:59:59.000Z

294

Techniques for Wetlands Construction and Management  

E-Print Network (OSTI)

Wetlands are important ecosystems that contain a vast array of plants and animals. Wetlands perform a variety of vital functions, such as purifying water. This publication explains the role of wetlands and how to construct and manage them....

Locke, Shawn; Frentress, C.; Cathey, James; Mason, C.; Hirsch, R.; Wagner, M.

2007-09-04T23:59:59.000Z

295

General overview of the Nigerian construction industry  

E-Print Network (OSTI)

The purpose of this study is to investigate and provide a general overview of the Nigerian construction industry, its role in the national economy, the main participants in the industry, the problems that they face, and ...

Dantata, Sanusi (Sanusi A.)

2008-01-01T23:59:59.000Z

296

Self-assembling multimeric nucleic acid constructs  

DOE Patents (OSTI)

The invention is directed to constructs and compositions containing multimeric forms of nucleic acid. Multimeric nucleic acids comprise single-stranded nucleic acids attached via biotin to streptavidin and bound with a functional group. These constructs can be utilized in vivo to treat or identify diseased tissue or cells. Repeated administrations of multimeric nucleic acid compositions produce a rapid and specific amplification of nucleic acid constructs and their attached functional groups. For treatment purposes, functional groups may be toxins, radioisotopes, genes or enzymes. Diagnostically, labeled multimeric constructs may be used to identify specific targets in vivo or in vitro. Multimeric nucleic acids may also be used in nanotechnology and to create self-assembling polymeric aggregates such as membranes of defined porosity, microcircuits and many other products.

Cantor, Charles R. (Boston, MA); Niemeyer, Christof M. (Bremen, DE); Smith, Cassandra L. (Boston, MA); Sano, Takeshi (Boston, MA); Hnatowich, Donald J. (Brookline, MA); Rusckowski, Mary (Southborough, MA)

1996-01-01T23:59:59.000Z

297

Self-assembling multimeric nucleic acid constructs  

DOE Patents (OSTI)

The invention is directed to constructs and compositions containing multimeric forms of nucleic acid. Multimeric nucleic acids comprise single-stranded nucleic acids attached via biotin to streptavidin and bound with a functional group. These constructs can be utilized in vivo to treat or identify diseased tissue or cells. Repeated administrations of multimeric nucleic acid compositions produce a rapid and specific amplification of nucleic acid constructs and their attached functional groups. For treatment purposes, functional groups may be toxins, radioisotopes, genes or enzymes. Diagnostically, labeled multimeric constructs may be used to identify specific targets in vivo or in vitro. Multimeric nucleic acids may also be used in nanotechnology and to create self-assembling polymeric aggregates such as membranes of defined porosity, microcircuits and many other products.

Cantor, Charles R. (Boston, MA); Niemeyer, Christof M. (Bremen, DE); Smith, Cassandra L. (Boston, MA); Sano, Takeshi (Boston, MA); Hnatowich, Donald J. (Brookline, MA); Rusckowski, Mary (Southborough, MA)

1999-10-12T23:59:59.000Z

298

Regulating new construction in historic areas  

E-Print Network (OSTI)

This study is an examination of how the restrictiveness of different design regulations impacts the process of new construction in historic areas. The North End, South End, and Back Bay neighborhoods of Boston were identified ...

Sellers-Garcia, Oliver

2006-01-01T23:59:59.000Z

299

Construction Safety Advisory Committee | Department of Energy  

Office of Environmental Management (EM)

meeting and included in the minutes of the meeting. Approved: Larry McCabe, P.E., MBA, CSP, DOEHQ Program Lead DOE Construction Safety Advisory Committee Jeffrey D. Feit,...

300

How to Construct a Seasonal Index  

E-Print Network (OSTI)

For many crops, seasonality is often the dominant factor influencing prices within a single production period. This publication explains how to construct and use several kinds of seasonal indexes for crop marketing information....

Tierney Jr., William I.; Waller, Mark L.; Amosson, Stephen H.

1999-07-12T23:59:59.000Z

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

New Construction Commercial Reference Buildings Archive  

Energy.gov (U.S. Department of Energy (DOE))

Here you will find past versions of the reference buildings for new construction commercial buildings, organized by building type and location. A summary of building types and climate zones is...

302

Statistical Downscaling Using Localized Constructed Analogs (LOCA)  

Science Journals Connector (OSTI)

A new technique for statistically downscaling climate model simulations of daily temperature and precipitation is introduced and demonstrated over the western United States. The localized constructed analogs (LOCA) method produces downscaled ...

David W. Pierce; Daniel R. Cayan; Bridget L. Thrasher

2014-12-01T23:59:59.000Z

303

DNA Assembly Line for Nano-Construction  

ScienceCinema (OSTI)

Building on the idea of using DNA to link up nanoparticles scientists at Brookhaven National Lab have designed a molecular assembly line for high-precision nano-construction. Nanofabrication is essential for exploiting the unique properties of nanoparticl

Oleg Gang

2010-01-08T23:59:59.000Z

304

Doctoral Defense "CONSTRUCTION WORKERS' ABSENCE BEHAVIOR  

E-Print Network (OSTI)

of the dynamic processes of the emergence and exertion of social controls for worker absence behavior in construction projects. To achieve these goals, five interrelated, interdisciplinary studies using survey

Kamat, Vineet R.

305

Construction of Higher Order Finite Element with  

E-Print Network (OSTI)

accuracy, stability Previous work: ffl Cohen, Joly, Tordjman (2D, construction, analysis, performance) ffl \\Gamma4 [b] with b = ?? 1 ?? 2 ?? 3 ?? 4 (bubble function), and b f a iface bubblej function. Accuracy

Kern, Michel

306

Construction Project Safety and Health Plan RM  

Energy.gov (U.S. Department of Energy (DOE))

The Construction Project Safety and Health Plan (CPSHP) Review Module is a tool that assists DOE federal project review teams in evaluating the technical sufficiency of the project readiness in...

307

Existing Commercial Reference Buildings Constructed Before 1980 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Existing Commercial Reference Buildings Constructed Before 1980 Existing Commercial Reference Buildings Constructed Before 1980 Existing Commercial Reference Buildings Constructed Before 1980 The files on this page contain commercial reference building models for existing buildings constructed before 1980, organized by building type and location. These U.S. Department of Energy (DOE) reference buildings are complete descriptions for whole building energy analysis. You can also return to a summary of building types and climate zones and information about other building vintages. These files are updated regularly. There are two versions of these files on this page. Version 1.3_5.0 was updated September 27, 2010 and Version 1.4_7.2 was updated November 13, 2012. You can also view related resources: an archive of past reference buildings files

308

Engineering, Procurement, and Construction Contracts and Performance  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Engineering, Procurement, and Construction Contracts and Engineering, Procurement, and Construction Contracts and Performance Guarantees Engineering, Procurement, and Construction Contracts and Performance Guarantees October 16, 2013 - 5:03pm Addthis Engineering, procurement, and construction (EPC) contracts with long-term performance guarantees are becoming increasingly popular for some renewable energy technologies, such as commercial-scale photovoltaics systems. EPC contracts give the owner unprecedented assurance that the system will provide the long-term energy benefits advertised without wasting time and money with the architectural and engineering (A&E) firm or expensive change orders. These performance guarantees cover the entire installation and go way beyond manufacturer warranties that only cover specific parts and not

309

Constructing Reliable Distributed Communication Systems with CORBA  

E-Print Network (OSTI)

Constructing Reliable Distributed Communication Systems with CORBA Silvano Maffeis Douglas C Communication software and distributed services for next- generation applications must be reliable, efficient model to support reliable data- and process- oriented distributed systems that communicate through syn

Schmidt, Douglas C.

310

A knowledge based constructability analysis prototype  

E-Print Network (OSTI)

: "Optimum integration of construction knowledge and experience in planning, engineering, procurement, and field operations to achieve overall project objectives. " (Tatum, Vanegas, and Williams, 1986) When defined by the contractor, the following results... methods and technologies. " (Tatum 1987) 1. 2. 2 Project Delivery System The constructability of a project is also contingent on the project delivery system. A project delivery system is: ". . . an organizational concept which assigns specific...

Winter, Laura Jo

2012-06-07T23:59:59.000Z

311

Construction Price Indexes | Data.gov  

NLE Websites -- All DOE Office Websites (Extended Search)

Price Indexes Price Indexes BusinessUSA Data/Tools Apps Challenges Let's Talk BusinessUSA You are here Data.gov » Communities » BusinessUSA » Data Construction Price Indexes Dataset Summary Description The Construction Price Indexes provide price indexes for single-family houses sold and for single-family houses under construction. The houses sold index incorporates the value of the land and is available quarterly at the national level and annually by region. The indexes for houses under construction are available monthly at the national level. The indexes are based on data funded by HUD and collected in the Survey of Construction (SOC). Tags {Laspeyres,Constant,Quality,Paasche,Output,Deflator,Fisher,Ideal,Index,absorption,apartment,authorized,authorization,build,building,built,characteristic,completed,completion,construction,contract,contractor,cost,development,dwelling,economic,existing,expenditures,family,financing,finished,floor,home,house,houses,housing,hud,indicator,index,issue,issuing,living,manufactured,market,metropolitan,microdata,month,multifamily,multiple,new,nonresidential,occupancy,occupants,occupied,office,one-unit,owner,permanent,permit,permits,price,private,privately-owned,public,quarters,rebuilt,region,regional,rent,rental,residential,rural,sale,sectional,single,single-family,site-built,size,sold,speculative,spending,stage,started,starts,structure,timeshare,under,unit,units,urban,u.s.,vacancy,valuation,zoning}

312

Planning for Years to Come  

NLE Websites -- All DOE Office Websites (Extended Search)

Planning for Years to Come Planning for Years to Come LANL's Governing Policy on the Environment August 1, 2013 Water sampling tour for the Association of Experiential Education...

313

A New Years Trip A New Years Trip  

E-Print Network (OSTI)

A New Years Trip A New Years Trip December 26, 2003 - January 3, 2004 By Saul Wilson #12;A New Years Trip 7 INTRODUCTION #12;A New Years Trip 8 rom December 26, 2003 to January 3, 2004 my dad and I

Wilson, W. Stephen

314

Calendar Year 2013  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

3 Office of Inspector General 
1000 3 Office of Inspector General 
1000 Independence Avenue, SW 
 Washington, DC 20585 202-586-4128 en Audit Report: OAS-FS-14-03 http://energy.gov/ig/downloads/audit-report-oas-fs-14-03 Audit Report: OAS-FS-14-03

315

Fourth Annual Report: 2007 Pre-Construction Eelgrass Monitoring and Propagation for King County Outfall Mitigation  

SciTech Connect

King County proposes to build a new sewer outfall discharging to Puget Sound near Point Wells, Washington. Construction is scheduled for 2008. The Point Wells site was selected to minimize effects on the nearshore marine environment, but unavoidable impacts to eelgrass (Zostera marina) beds are anticipated during construction. To mitigate these impacts and prepare for post-construction restoration, King County began implementing a multiyear eelgrass monitoring and restoration program in 2004, with the primary goal of returning intertidal and shallow subtidal habitat and eelgrass to pre-construction conditions. Major program elements related to eelgrass are (a) pre-construction monitoring, i.e., documenting initial eelgrass conditions and degree of fluctuation over 5 years prior to construction, (b) eelgrass transplanting, including harvesting, offsite propagating, and stockpiling of local plants for post-construction planting, and (c) post-construction planting and subsequent monitoring. The program is detailed in the Eelgrass Restoration and Biological Resources Implementation Workplan (King County 2006). This report describes calendar year 2007 pre-construction activities conducted by Pacific Northwest National Laboratory (PNNL) for King County. Activities included continued propagation of eelgrass shoots at the PNNL Marine Sciences Laboratory (MSL) in Sequim, Washington, and monitoring of the experimental harvest plots in the marine outfall corridor area to evaluate recovery rates relative to harvest rates. In addition, 490 eelgrass shoots were also harvested from the Marine Outfall Corridor in July 2007 to supplement the plants in the propagation tank at the MSL, bringing the total number of shoots to 1464. Eelgrass densities were monitored in four of five experimental harvest plots established in the Marine Outfall Corridor. Changes in eelgrass density were evaluated in year-to-year comparisons with initial harvest rates. A net increase in eelgrass density from 2004 post-harvest to 2007 was observed in all plots, despite density decreases observed in 2006 in all plots and at most harvest rates. Eelgrass densities within individual subplots were highly variable from year to year, and the change in density in any interannual period was not related to initial 2004 harvest rate. Harvest rates of neighboring subplots did not appear to affect subplot eelgrass density (Woodruff et al. 2007). Three years post-harvest, eelgrass shoot densities were not significantly different from pre-harvest shoot densities at any harvest level. Additional plans are being discussed with King County to harvest all eelgrass from the construction corridor and hold in the propagation tanks at the MSL for post-construction planting. Under this plan, plants that would have been lost to construction will be held offsite until construction is completed. This strategy reduces and possibly eliminates the need to harvest eelgrass from donor beds located south of the construction area, allowing them to remain undisturbed. However, if eelgrass is harvested from donor beds, the monitoring of eelgrass growth at different harvest rates should help determine an optimum harvest rate that supports rapid recovery of donor eelgrass beds.

Woodruff, Dana L.; Kohn, Nancy P.; Cullinan, Valerie I.; Southard, Susan S.; Vavrinec, John

2007-10-04T23:59:59.000Z

316

The Foundation Year Monash University  

E-Print Network (OSTI)

The Foundation Year Monash University Foundation Year Monash College has helped me to make my future better. By studying the Foundation Year, I am always learning something new and still having lots of fun. Thanks to the Foundation Year, I am preparing for a successful future. Vonny Leonardy, Monash

Albrecht, David

317

NUCLEAR ENGINEERING Four Year Plan  

E-Print Network (OSTI)

NUCLEAR ENGINEERING Four Year Plan Fall 2009 Nuclear Engineering (67 hrs) CH Grade Perspectives (15;Nuclear Engineering Four Year Plan Starting Fall 2009 FALL Year 1 Credits WINTER Year 1 Credits SPRING I NE 452 3 Neutronic Analysis II NE 457 2 Nuclear Reactor Lab Western Culture (3): NE 467 4 Nucl

Tullos, Desiree

318

Residential Commercial Industrial Year  

Gasoline and Diesel Fuel Update (EIA)

4 4 Residential Commercial Industrial Year and State Volume (million cubic feet) Consumers Volume (million cubic feet) Consumers Volume (million cubic feet) Consumers 2000 Total ................... 4,996,179 59,252,728 3,182,469 5,010,817 8,142,240 220,251 2001 Total ................... 4,771,340 60,286,364 3,022,712 4,996,446 7,344,219 217,026 2002 Total ................... 4,888,816 61,107,254 3,144,169 5,064,384 7,507,180 205,915 2003 Total ................... R 5,079,351 R 61,871,450 R 3,179,493 R 5,152,177 R 7,150,396 R 205,514 2004 Total ................... 4,884,521 62,469,142 3,141,653 5,135,985 7,250,634 212,191 Alabama ...................... 43,842 806,175 26,418 65,040 169,135 2,800 Alaska.......................... 18,200 104,360 18,373 13,999 46,580 10 Arizona ........................

319

Manhattan Project: Y-12 Construction, 1943  

Office of Scientific and Technical Information (OSTI)

Groundbreaking for Y-12, Oak Ridge Y-12: CONSTRUCTION Groundbreaking for Y-12, Oak Ridge Y-12: CONSTRUCTION (Oak Ridge: Clinton, 1943) Events > The Uranium Path to the Bomb, 1942-1944 Y-12: Design, 1942-1943 Y-12: Construction, 1943 Y-12: Operation, 1943-1944 Working K-25 into the Mix, 1943-1944 The Navy and Thermal Diffusion, 1944 Groundbreaking for the Alpha plant of the Y-12 Electromagnetic Plant took place at Oak Ridge on February 18, 1943 (right). Soon blueprints could not be produced fast enough to keep up with construction as Stone & Webster labored to meet Leslie Groves's deadline. The Beta facility was actually begun before formal authorization. While laborers were aggressively recruited, there was always a shortage of workers skilled Y-12 construction, Oak Ridge enough to perform jobs according to the rigid specifications. (A further complication was that some tasks could be performed only by workers with security clearances.) Huge amounts of material had to be obtained (38 million board feet of lumber, for instance), and the magnets needed so much copper for windings that the Army had to borrow almost 15,000 tons of silver bullion from the United States Treasury to fabricate into strips and wind on to coils as a substitute for copper. Treasury silver was also used to manufacture the busbars that ran around the top of the racetracks.

320

Table 2 -Lime use and practices on Corn, major producing states, 2001 CO GA IL IN IA KS KY MI MN MO NE NY NC ND OH PA SD TX WI Area  

E-Print Network (OSTI)

Table 2 - Lime use and practices on Corn, major producing states, 2001 CO GA IL IN IA KS KY MI MN.7 Table 2 - Lime use and practices on Corn, major producing states, 2000 CO IL IN IA KS KY MI MN MO NE NY use and practices on Corn, major producing states, 1999 CO IL IN IA KS KY MI MN MO NE NC OH SD TX WI

Kammen, Daniel M.

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Categorical Exclusion 4565, Waste Management Construction Support  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

FornI FornI Project Title: Waste Management Construction Support (4565) Program or Program Office: Y -12 Site Office Location: Oak Ridge Tennessee Project Description: This work scope is an attempt to cover the general activities that construction would perform in support of Waste Management activities. Work includes construction work performed in support of Waste Management Sustainability and Stewardship projects and programs to include: load waste into containers; open, manipulate containers; empty containers; decommission out-of-service equipment (includes removal of liquids, hazardous, and universal wastes); apply fabric and gravel to ground; transport equipment; transport materials; transport waste; remove vegetation; place barriers; place erosion controls; operate wheeled and tracked equipment; general carpentry. Work will be performed on dirt, vegetated, graveled, or paved surfaces in

322

FAQS Job Task Analyses - Construction Management  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

80-2004: Construction Management Functional Area Qualification Standard 80-2004: Construction Management Functional Area Qualification Standard 1 Conducting the Job / Task Analysis DOE-STD-1180-2004: Construction Management Functional Area Qualification Standard Step 1: Identify and evaluate tasks * Develop a comprehensive list of tasks that define the job. o A great starting point is the list of Duties and Responsibilities from the FAQS. o Give careful thought to additional tasks that could be considered. o Don't worry about deleting tasks at this point - that is a part of the process further down. * List the tasks (and their sources, e.g., Duties and Responsibilities #1) in the chart below. * Discuss each task as a group and come to a consensus pertaining to Importance and Frequency of the task (i.e., each team

323

Achieving Sustainable Construction in Affordable Housing  

SciTech Connect

An energy-efficient design and construction checklist and information sheets on energy-efficient design and construction are two products being developed. These products will help affordable housing providers take the first steps toward a whole-house approach to the design and implementation of energy-efficient construction practices. The checklist presents simple and clear guidance on energy improvements that can be readily addressed now by most affordable housing providers. The information sheets complement the checklist by providing installation instructions and material specifications that are accompanied by detailed graphics. The information sheets also identify benefits of recommended energy-efficiency measures and procedures including cost savings and impacts on health and comfort. This paper presents details on the checklist and information sheets and discusses their use in two affordable housing projects.

Barcik, M.K.; Creech, D.B.; Ternes, M.P.

1998-12-07T23:59:59.000Z

324

Department of Energy Construction Safety Reference Guide  

SciTech Connect

DOE has adopted the Occupational Safety and Health Administration (OSHA) regulations Title 29 Code of Federal Regulations (CFR) 1926 ``Safety and Health Regulations for Construction,`` and related parts of 29 CFR 1910, ``Occupational Safety and Health Standards.`` This nonmandatory reference guide is based on these OSHA regulations and, where appropriate, incorporates additional standards, codes, directives, and work practices that are recognized and accepted by DOE and the construction industry. It covers excavation, scaffolding, electricity, fire, signs/barricades, cranes/hoists/conveyors, hand and power tools, concrete/masonry, stairways/ladders, welding/cutting, motor vehicles/mechanical equipment, demolition, materials, blasting, steel erection, etc.

Not Available

1993-09-01T23:59:59.000Z

325

Impacts of Rising Construction and Equipment Costs on Energy Industries (released in AEO2007)  

Reports and Publications (EIA)

Costs related to the construction industry have been volatile in recent years. Some of the volatility may be related to higher energy prices. Prices for iron and steel, cement, and concrete -- commodities used heavily in the construction of new energy projects -- rose sharply from 2004 to 2006, and shortages have been reported. How such price fluctuations may affect the cost or pace of new development in the energy industries is not known with any certainty, and short-term changes in commodity prices are not accounted for in the 25-year projections in Annual Energy Outlook 2007. Most projects in the energy industries require long planning and construction lead times, which can lessen the impacts of short-term trends.

2007-01-01T23:59:59.000Z

326

Landscape Architecture Construction Winter, 2013 MWF 9-11:40  

E-Print Network (OSTI)

Landscape Architecture Construction Winter, 2013 NRE 688 MWF 9-11:40 3556 Dana Hall Site Planning. Timesaver Standards for Landscape Architects Hopper. Landscape Architectural Graphic Standards Landphair & Klatt. Landscape Architecture Construction. Thallon. Graphic Guide to Wood Frame Construction. Thallon

Awtar, Shorya

327

Buildings Energy Data Book: 3.5 Commercial Builders and Construction  

Buildings Energy Data Book (EERE)

1 1 Value of New Commercial Building Construction, by Year ($2010 Billion) 1980 159.8 2.5% 1985 226.3 3.0% 1990 227.2 2.6% 1995 203.8 2.0% 2000 312.7 2.5% 2005 302.2 2.2% 2006 334.7 2.3% 2007 383.3 2.6% 2008 399.6 2.7% 2009 328.5 2.3% 2010 257.5 1.8% Source(s): 14,639 14,639 14,254 14,660 DOC, Current Construction Reports: Value of New Construction Put in Place, C30, Aug. 2003, Table 1 for 1980-1990; DOC, Annual Value of Private Construction Put in Place, Aug. 2008 for 1995-2000; DOC, Annual Value of Private Construction Put in Place, Aug. 2011 for 2002-2010; DOC, Annual Value of Public Construction Put in Place, Aug. 2008 for 1995-2000; DOC, Annual Value of Public Construction Put in Place, Aug. 2011 for 2002-2010; and EIA, Annual Energy Review 2010, Aug. 2011, Appendix D, p. 353 for GDP and price deflators.

328

Developing a technology roadmap for construction R&D through interdisciplinary research efforts  

Science Journals Connector (OSTI)

Construction projects are getting bigger and more complex while the average productivity at the industry level is not improving enough. It is essential to look at the means available, in order to improve the efficiency and effectiveness of the construction industry. Technology fusion, which refers to a truly interdisciplinary approach of combining different technology areas, is a new way of sparking off the currently stagnant level of construction technologies. This paper presents a comprehensive technology roadmap developed under the support of Korea Ministry of Construction and Transportation (KMOCT), where the needs for innovative future construction technology are well organized through the interdisciplinary research efforts. To succeed in developing a technology fusion-based construction research plan, four major approaches are adopted: technology foresight, socio-economic prediction, market needs identification, and benchmarking of other efforts. Through these integrated processes, research and development (R&D) programs that cover the entire life cycle of construction projects are proposed. KMOCT is expected to launch 14 of the proposed programs during the next five years on a priority base, funding a total of approximately US$ 5 to 15million for each program.

Changyoon Kim; Hyoungkwan Kim; Seung H. Han; Changwan Kim; Moon Kyum Kim; Sang H. Park

2009-01-01T23:59:59.000Z

329

Nepal Migration Year Book 2011 Migration Year Book  

E-Print Network (OSTI)

Nepal Migration Year Book 2011 1 #12;Nepal Migration Year Book 2011 NIDS NCCR North-South #12;Book Nepal Migration Year Book 2011 Publishers Nepal Institute of Development Studies (NIDS) G.P.O. Box: 7647, Kathmandu, Nepal Email: nids@mail.com.np Web: www.nids.org.np National Centre of Competence in Research

Richner, Heinz

330

After 70 years of service, taking action for the future  

NLE Websites -- All DOE Office Websites (Extended Search)

After 70 years of service, taking action for the future After 70 years of service, taking action for the future Community Connections: Our link to Northern New Mexico Communities Latest Issue:Dec. 2013 - Jan. 2014 All Issues » submit After 70 years of service, taking action for the future April 1, 2013 Director Charlie McMillan Lab Director Charlie McMillan. Contact Editor Linda Anderman Email Community Programs Office Kurt Steinhaus Email Welcome, everyone, to the latest edition of Connections. As we at the Laboratory commemorate 70 years of service to the nation, I think it's appropriate to talk a little about the next 70 years as well. But first, allow me to extend an invitation. On Friday, April 5, the Los Alamos Historical Society will unveil the official military portrait of the man who oversaw construction of the Laboratory-Gen. Leslie Groves. (See

331

Alternative Fuels Data Center: Biofuels Construction and Permitting  

Alternative Fuels and Advanced Vehicles Data Center (EERE)

Biofuels Construction Biofuels Construction and Permitting Assistance to someone by E-mail Share Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Facebook Tweet about Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Twitter Bookmark Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Google Bookmark Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Delicious Rank Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on Digg Find More places to share Alternative Fuels Data Center: Biofuels Construction and Permitting Assistance on AddThis.com... More in this section... Federal State Advanced Search All Laws & Incentives Sorted by Type

332

Minnesota Power - Residential New Construction Rebate Program | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Minnesota Power - Residential New Construction Rebate Program Minnesota Power - Residential New Construction Rebate Program Minnesota Power - Residential New Construction Rebate Program < Back Eligibility Construction Residential Savings Category Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Program Info State Minnesota Program Type Utility Rebate Program Rebate Amount $2,000 Provider Minnesota Power Through Minnesota Power's Triple E New Construction Program, homeowners and builders can qualify for special incentive rebates by meeting specific energy standards on new home construction. These standards cover thermal integrity (insulation, windows and doors, exterior wind barriers), airtight construction, moisture control, appliances, lighting, ventilation, and

333

CRAD, Nuclear Facility Construction - Piping and Pipe Supports...  

Office of Environmental Management (EM)

Nuclear Facility Construction - Piping and Pipe Supports Inspection - March 29, 2012 CRAD, Nuclear Facility Construction - Piping and Pipe Supports Inspection - March 29, 2012...

334

Project Level Factors Affecting Quality of Construction Projects.  

E-Print Network (OSTI)

??Quality management is an important topic in today s construction industry as it has become essential for construction companies to focus on increasing quality performance (more)

Bansal, Ankit

2009-01-01T23:59:59.000Z

335

DTE Energy- Commercial New Construction Energy Efficiency Program  

Energy.gov (U.S. Department of Energy (DOE))

DTE Energy offers rebates for commercial facility new construction. Measures eligible for new construction and remodeling incentives encourage an integrated approach to incorporating energy...

336

Hythane project by Hydrogen China Ltd and China Railway Construction...  

Open Energy Info (EERE)

by Hydrogen China Ltd and China Railway Construction Corporation Jump to: navigation, search Name: Hythane project by Hydrogen China Ltd and China Railway Construction Corporation...

337

UPDES Storm Water Permits: General Construction Website | Open...  

Open Energy Info (EERE)

Construction Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: UPDES Storm Water Permits: General Construction Website Abstract this website...

338

Colorado Construction Air Permit Application | Open Energy Information  

Open Energy Info (EERE)

for a construction permit for construction of a commercial or industrial source of air pollution. Form Type ApplicationNotice Form Topic Air Pollution Control Division -...

339

Pepco Update on Current Construction Work and Mirant Generation...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Update on Current Construction Work and Mirant Generation Needs for Pepco's Planned June Line Outage Pepco Update on Current Construction Work and Mirant Generation Needs for...

340

Wanzek Construction Inc | Open Energy Information  

Open Energy Info (EERE)

Wanzek Construction Inc Wanzek Construction Inc Jump to: navigation, search Name Wanzek Construction, Inc. Place Fargo, North Dakota Zip 58103 Sector Renewable Energy, Wind energy Product Fargo (North Dakota)-based engineering firm specializing in heavy and industrial projects for the market sectors of power, renewable energy, industrial process, heavy/civil and wind energy construction. Coordinates 36.37617°, -99.622804° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":36.37617,"lon":-99.622804,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Constructing and Forbidding Automorphisms in Lifted Maps  

E-Print Network (OSTI)

Constructing and Forbidding Automorphisms in Lifted Maps Dan Archdeacon Department of Mathematics an algebraic description of surfaces with boundary to study covering maps. The focus is on the relationship between automor­ phisms in the base and lifted maps. We show how to introduce and/or prohibit additional

Archdeacon, Dan

342

31 Tannery Road- Ferreira Construction Headquarters  

Branchburg, NJ The 31 Tannery project, located in Branchburg, New Jersey, is the corporate headquarters for Ferreira Construction and Ferreira Group. The facility is 42,000 square feet and serves as office space, shop, and living lab. This state-of-the-art facility raises the bar for a commercial high-performance building, with an eye towards energy independence.

343

Acoustics of modular constructionIndustry overview  

Science Journals Connector (OSTI)

This session will provide an overview of the issues and efforts impacting the commercial modular construction industry throughout North America with particular focus on acoustics in relocatable classrooms. The Modular Building Institute is the international nonprofit trade association representing manufacturers and dealers of commercial modular facilites both temporary and permanent serving educational health care retail industrial military and multi?family markets.

Thomas E. Hardiman

2007-01-01T23:59:59.000Z

344

Symmetries and "principles of construction" in Foundations  

E-Print Network (OSTI)

Symmetries and "principles of construction" in Foundations Giuseppe Longo LIENS, CNRS ­ ENS, Paris Preliminaries A "foundational analysis" (a fully justified search for "unshakable certainties", in 1900) Frege and Hilbert: the search for (proof) principles and "unshakable certainties" (different: absolute laws

Longo, Giuseppe

345

Composite RCS frame systems: construction and peformance  

E-Print Network (OSTI)

The objective of this research program is to further evaluate the performance and constructability of reinforced concrete (RC) column-steel beam-slab systems (RCS) for use in low- to mid-rise space frame buildings located in regions of high wind...

Steele, John Phillip

2004-09-30T23:59:59.000Z

346

The Frankenstein Approach to Wordnet Construction Sprkbanken  

E-Print Network (OSTI)

by scaveng- ing and recycling information from a num- ber of existing lexical resources. Among its more constructed mainly by scav- enging and recycling lexical-semantic information from a number of existing lexical resources. Other noteworthy features of Swesaurus which distin- guish it from most other wordnets

347

Energy and Labor in the Construction Sector  

Science Journals Connector (OSTI)

...The opera-. tional energy demand would be 60.5 mil-lion...and an operational energy demand, due to conduction heat loss...is, 1 percent of the 1976 refinery output of No. 6 fuel oil...final new building construction demand; nevertheless, they may be...

Bruce Hannon; Richard G. Stein; B. Z. Segal; Diane Serber

1978-11-24T23:59:59.000Z

348

Statistical Emulator Construction for Nonlinear Smart Systems  

E-Print Network (OSTI)

efficient surrogates for nonlinear smart material models. We will primarily focus on emulators ferroelectric materials ideal components of a number of smart systems [3]. For example, polyvinylidene fluorideStatistical Emulator Construction for Nonlinear Smart Systems Francesca D. Reale1 and Ralph C

349

ATNI Mid-year Convention  

Energy.gov (U.S. Department of Energy (DOE))

The Affiliated Tribes of Northwest Indians Mid-year Convention will be hosted by the Chehalis Tribe.

350

ESR NC-08-2011  

NLE Websites -- All DOE Office Websites (Extended Search)

in the system and the flow of liquid as dictated by the process recipe entered in the software. The other end of the T goes to a vacuum-insulated transfer line which can be...

351

ESR NC-30-2011  

NLE Websites -- All DOE Office Websites (Extended Search)

(Area: 0735-FIRST-1-1L43) Ionizing and Non-ionizing Radiation Hazards: Radio frequency (RF) or Microwave sources exceeding 10 mW radiated output (Area: 0735-FIRST-1-1L43)...

352

NC-FRA-001_Walking  

NLE Websites -- All DOE Office Websites (Extended Search)

Walking and movement in building and around grounds Severity (C) First Aid Only Medical Treatment Lost Time Partial Disability Death or Permanent Disability Training...

353

ESR NC-10-2011  

NLE Websites -- All DOE Office Websites (Extended Search)

room temperature stations (Signatone CheckMate and Rucker and Kolls model 260), and a cryogenic probe station, the LakeShore Model HFTP4, which uses liquid helium and liquid...

354

ESR NC-07-2011  

NLE Websites -- All DOE Office Websites (Extended Search)

to "suit up" - i.e. put on a clean room coverall, a head covering, shoe covers and boots and nitrile gloves at all times. The proper procedure for clean room gowning is...

355

(Amorphous Computing) "(Natural Computation : NC)  

E-Print Network (OSTI)

and Informatics (SCI 2002), Vol.11, pp.329-336, 2002. [7] , : Programming with Logical Links 19 , 2002.(CD-ROM) [8] , : occurs- check 19 , 2002.(CD-ROM) [9] , , , , : DKLIC 19 , 2002.(CD-ROM) [10] , : GHC LMNtal 2002 , 2002.(http://www.ipsj.or.jp/prosym/sprosym/program/index.html) [11] A* 17 1E3-02, 2002 6 (CD-ROM) [12

Hagiya, Masami

356

The Construction of the Konrad Repository - Status and Perspective - 13034  

SciTech Connect

Due to the Atomic Energy Act of Germany the Federation is responsible for the construction and operation of installations for the safekeeping and disposal of radioactive waste. The Federal Office for Radiation Protection (Bundesamt fuer Strahlenschutz - BfS) is assigned with this duty. In 1982 the abandoned iron ore mine Konrad near Salzgitter (Federal State of Lower Saxony) was proposed as a repository for low and intermediate level radioactive waste with negligible heat generation. After 20 years of plan approval procedure the license was granted by the Ministry for Environment of Lower Saxony in May 2002. This decision was finally confirmed by the Federal Administrative Court in March 2007. The construction has started, but former assumptions about the beginning of waste emplacement tuned out to be too optimistic. In the course of the preparatory work and the implementation planning it turned out that many changes need to be done. As a matter of fact most of the documents and planning originate from the 1990's and need to be revised because from that time on until now no adaptation was appropriate. The necessity to apply the state-of-the-art technology and other legal implications give rise to further changes and new licensing procedures, especially building licenses. Furthermore, the license from 2002 also includes a lot of collateral clauses that need to be fulfilled before radioactive waste can be emplaced. With this in mind, the time frame for the construction of the Konrad repository was revised in 2010. As a result, the completion of the erection before 2019 does not seem to be realistic. (authors)

Kunze, V. [Bundesamt fuer Strahlenschutz - BfS, Postfach 10 01 49, 38201 Salzgitter (Germany)] [Bundesamt fuer Strahlenschutz - BfS, Postfach 10 01 49, 38201 Salzgitter (Germany)

2013-07-01T23:59:59.000Z

357

Geopolymer concretes: a green construction technology rising from the ash  

SciTech Connect

Researchers at Louisiana Tech University have embarked on a multi-year research initiative to develop applications for inorganic polymer concrete, or geopolymer concrete, in the area of civil construction, and to bring solve of these applications to market. One objective was to produce a spray-on coating for use in the harsh environment of wastewater conveyance and treatment facilities. Another project is to establish relationships between fly ash composition and particle size distribution and the mechanical attributes and workability of the resulting geopolymer concrete. A third project is to develop a 'smart' geopolymer concrete whose response to a given electric current can be correlated to the stress level to which the structure is subjected. 1 fig., 6 photos.

Allouche, E. [Louisiana Tech University, LA (United States)

2009-07-01T23:59:59.000Z

358

An Australian Icon - Planning and Construction of the Parkes Telescope  

E-Print Network (OSTI)

By almost any measure, the Parkes Radio Telescope is the most successful scientific instrument ever built in Australia. The telescope is unsurpassed in terms of the number of astronomers, both national and international, who have used the instrument, the number of research papers that have flowed from their research, and the sheer longevity of its operation (now over fifty years). The original planners and builders could not have envisaged that the telescope would have such an extraordinarily long and productive future. From the start, it was an international project by CSIRO that in the 1950s launched Australia into the world of `big science'. Partly funded by the US Carnegie and Rockefeller foundations, it was designed in England by Freeman Fox & Partners, and built by the German firm MAN. This article will give an overview of the origins of the idea for the telescope and the funding, planning and construction of the Parkes dish over the period 1954 to 1961.

Robertson, Peter

2012-01-01T23:59:59.000Z

359

SRNL RADIONUCLIDE FIELD LYSIMETER EXPERIMENT: BASELINE CONSTRUCTION AND IMPLEMENTATION  

SciTech Connect

The purpose of this document is to compile information regarding experimental design, facility design, construction, radionuclide source preparation, and path forward for the ten year Savannah River National Laboratory (SRNL) Radionuclide Field Lysimeter Experiment at the Savannah River Site (SRS). This is a collaborative effort by researchers at SRNL and Clemson University. The scientific objectives of this study are to: Study long-term radionuclide transport under conditions more representative of vadose zone conditions than laboratory experiments; Provide more realistic quantification of radionuclide transport and geochemistry in the vadose zone, providing better information pertinent to radioactive waste storage solutions than presently exists; Reduce uncertainty and improve justification for geochemical models such as those used in performance assessments and composite analyses.

Roberts, K.; Kaplan, D.; Bagwell, L.; Powell, B.; Almond, P.; Emerson, H.; Hixon, A.; Jablonski, J.; Buchanan, C.; Waterhouse, T.

2012-10-17T23:59:59.000Z

360

Updated 5/20/14 Freshman Year (32) Sophomore Year (34) Junior Year (34)  

E-Print Network (OSTI)

Updated 5/20/14 Freshman Year (32) Sophomore Year (34) Junior Year (34) Fall (15) Spring (18) Fall (17) Spring (16) Fall (18) Spring (16) Fall (16) Spring (13) CALC I (4) CALC III [4] SOLIDS (3) CALC membership recommended prerequisite corequisite Engineering-related summer job or internship recommended lab

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

Updated 3/21/13 Freshman Year (32) Sophomore Year (34) Junior Year (34)  

E-Print Network (OSTI)

Updated 3/21/13 Freshman Year (32) Sophomore Year (34) Junior Year (34) Fall (15) Spring (17) Fall (18) Spring (16) Fall (18) Spring (16) Fall (16) Spring (13) CALC I (4) CALC III [4] SOLIDS (3) CALC membership recommended prerequisite corequisite Engineering-related summer job or internship recommended lab

362

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

. Income Expenditure Assets Liabilities http://www.fin.mmu.ac.uk/f18_001b.htm06/07/2004 13:02:41 #12;5 Year Financial Profile - Charts - Income 5 Year Financial Profile Charts Income Back http://www.fin.mmu.ac.uk/f18 Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_001d.htm06/07/2004 13:02:52 #12;5 Year

363

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

. Income Expenditure Assets Liabilities http://www.fin.mmu.ac.uk/f18_0029.htm06/07/2004 13:01:23 #12;5 Year Financial Profile - Charts - Income 5 Year Financial Profile Charts Income Back http://www.fin.mmu.ac.uk/f18 Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_002d.htm06/07/2004 13:01:34 #12;5 Year

364

400A Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APCF APCF Past APCF Memoranda APCF Past Construction Past APCF Construction Day Activity Impact Monday - 10.01.12 Excavation Small Concrete Small Site Utilities Small Tuesday - 10.02.12 Excavation Small Concrete Small Site Utilities Small Wednesday - 10.03.12 Excavation Small Concrete Small Site Utilities Moderate Thursday - 10.04.12 Excavation Small Concrete Small Site Utilities Moderate Friday - 10.05.12 Excavation Small Concrete Small Site Utilities Moderate Site Utility water line hot tap Moderate Saturday - 10.06.12 No work is scheduled for the weekends -/- Sunday - 10.07.12 No work is scheduled for the weekends -/- Monday - 10.08.12 Excavation Small Concrete Small Interior underground plumbing Small Site Utilities Moderate Site Utility water line hot tap Moderate

365

Hanford Waste Treatment Plant Construction Quality Review  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

ARPT-WTP-2011-002 ARPT-WTP-2011-002 Site: DOE Hanford Waste Treatment Plant Subject: Office of Independent Oversight's Office of Environment, Safety and Health Evaluations Activity Report for the Hanford Waste Treatment Plant Construction Quality Review Dates of Activity 02/14/2011 - 02/17/2011 Report Preparer Joseph Lenahan Activity Description/Purpose: The purpose of the visit was to perform a review of construction quality assurance at the Waste Treatment Plant (WTP) site activities concurrently with the Department of Energy (DOE) WTP staff. One focus area for this visit was piping and pipe support installations. The Office of Health, Safety and Security (HSS) attended several Bechtel National Incorporated (BNI) project meetings, reviewed the WTP project quality assurance program, reviewed DOE-WTP inspection reports completed by the DOE-WTP

366

APCF Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

APCF APCF Past APCF Memoranda APCF, Construction Schedule This is a tentative schedule of the daily construction at APCF. For the preliminary two to three week look ahead schedule, please click the PDF calendar to the left. The potential for ground vibration is noted in the "Impact" column (None, Small, Moderate, High, Very High). Daily schedule for dates up to 01.17.2014 Day Activity Impact Monday - 08.05.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Site Grading Low Tuesday - 08.06.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Landscaping Low Wednesday - 08.07.13 Studs and Drywall None Ceiling Piping None Curtain Wall None Landscaping Low Thursday - 08.08.13 Studs and Drywall None Ceiling Piping None Curtain Wall None

367

The construction of the L3 experiment  

Science Journals Connector (OSTI)

The L3 experiment is one of the six large detectors designed for the new generation of electron-positron accelerators. It is the only detector that concentrates its efforts on limited goals of measuring electrons, muons and photons. By not attempting to identify hadrons, L3 has been able to provide an order of magnitude better resolution for electrons, muons and photons. Vertices and hadron jets are also studied. The construction of L3 has involved much state of the art technology in new principles of vertex detection and in new crystals for large scale electromagnetic shower detection and ultraprecise muon detection. This paper presents a summary of the construction of L3.

B. Adeva; M. Aguilar-Benitez; H. Akbari; J. Alcaraz; A. Aloisio; J. Alvarez-Taviel; G. Alverson; M.G. Alviggi; H. Anderhub; A.L. Anderson; A.M. Angelov; T.H. Angelov; G.H. Antchev; L. Antonov; D. Antreasyan; A. Arefiev; I.H. Atanasov; B. Auroy; R. Ayad; O.L. Ayranov; T. Azemoon; T. Aziz; U. Bachmann; P. Bhler; J.A. Bakken; L. Baksay; H. Baldinger; R.C. Ball; J. Ballansat; S. Banerjee; J. Bao; G. Barbier; L. Barone; G. Basti; A. Bay; F. Beauvais; U. Becker; R. Beissel; S. Bendig; P. Bn; J. Berdugo; P. Berges; M. Berthet; Y. Bertsch; B.L. Betev; A. Biland; A. Bischoff; M. Bischops; R. Bizzarri; J.J. Blaising; M. Blanc; P. Blmeke; B. Blumenfeld; G.J. Bobbink; M. Bocciolini; K.D. Boffin; W. Bohlen; A. Bhm; T. Bhringer; H. Bonnefon; C. Bopp; B. Borgia; K. Bosseler; J.F. Bottolier; M. Bourquin; D. Boutigny; P. Bowditch; J.G. Branson; D. Braun; I.C. Brock; F. Bruyant; M. Buchholz; B. Bcken; W. Bulgeroni; R. Burel; J.D. Burger; C. Burgos; J.P. Burq; L. Caiazzo; M. Caillat; B. Camberlin; D. Campana; C. Camps; V. Canale; M. Capell; F. Carbonara; F. Carminati; A.M. Cartacci; M. Cerrada; F. Cesaroni; Y.H. Chang; J.W. Chapman; M. Chemarin; A. Chen; C. Chen; H.F. Chen; H.S. Chen; M. Chen; M.L. Chen; S.R. Chendvankar; G. Chevenier; S. Chidzik; G. Chiefari; C.Y. Chien; F. Chollet; M. Chumakov; C. Civinini; I. Clare; R. Clare; G. Coignet; N. Colino; V. Commichau; G. Conforto; P. Cristofori; F. Crijns; X.Y. Cui; T.S. Dai; R. D'Alessandro; M. Daniel; X. De Bouard; B. Debye; G. Decreuse; A. Degr; K. Deiters; E. Dnes; P. Denes; F. DeNotaristefani; M. Deutschmann; M. Dhina; B. Didierjean; M. Diemoz; M. Dietrich; H.A. Dimitrov; C. Dionisi; F. Dittus; M. Dohmen; R. Dolin; J.F. Donahue; A. Donat; E. Drago; K.H. Dreger; T. Driever; G. Dromby; P. Duinker; I. Duran; M. Elkacimi; H. Elmamouni; A. Engler; F.J. Eppling; F.C. Ern; I. Erne; H. Esser; P. Extermann; R. Fabbretti; G. Faber; S. Falciano; T. Falk; S.J. Fan; M. Favre; J. Fay; S. Fehr; J. Fehlmann; M. Feldmann; H. Fenker; T. Ferguson; M. Fernandez; F. Ferroni; H. Fesefeldt; J. Field; J.M. Figarola; C.F. Figueroa; G.A. Filipov; B. Folign; G. Forconi; T. Foreman; V. Franzke; W. Frei; K. Freudenreich; W. Friebel; M. Fukushima; G. Gaillard; M. Gailloud; Yu. Galaktionov; E. Gallo; S.N. Ganguli; D. Garelick; S.S. Gau; G. Gavrilov; E. Gennari; S. Gentile; M. Gettner; C. Girard; M. Glaubman; S. Goldfarb; Z.F. Gong; E. Gonzalez; A. Gordeev; Yu. Gorodkov; P. Gttlicher; C. Goy; M. Goyot; G. Gratta; A. Grimes; C. Grinnell; M. Gruenewald; M. Guanziroli; S. Guerra; C. Guillon; A. Gurtu; D. Gsewell; H.R. Gustafson; M. Haensli; M. Haan; C. Haller; T. Hamacher; H. Hammers; K. Hangarter; S. Hancke; M. Harris; D. Harting; F.G. Hartjes; C.F. He; A. Heavey; T. Hebbeker; M. Hebert; R. Heller; Ch. Helmrath; J. Herrmann; G. Herten; U. Herten; A. Herv; H. Hesser; G. Hilgers; K. Hilgers; H. Hofer; H. Hofer; M. Hofer; T. Hofer; F. Hoffmann; U. Horisberger; I. Horvath; L.S. Hsu; G.Q. Hu; B. Ille; M.M. Ilyas; G. Improta; V. Innocente; E. Isiksal; E. Jagel; B.N. Jin; L.W. Jones; M. Jongmanns; H. Jung; P. Kaaret; O. Kaelin; W. Kaestli; Yu. Kamyshkov; D. Kaplan; W. Karpinski; Y. Karyotakis; W. Kertzer; V. Khoze; G. Kirchhoff; W. Kittel; A. Klimentov; P.F. Klok; M. Kollek; M. Koller; A.C. Knig; O. Kornadt; V. Koutsenko; R.W. Kraemer; V.R. Krastev; A. Kratel; W. Krenz; A. Kuhn; A. Kunin; S. Kwan; J. Lacotte; M. LaMarra; G. Landi; W. Lange; K. Lanius; D. Lanske; S. Lanzano; J.M. Le Goff; J.C. Le Marec; D. Lea; M. Lebeau; P. Lebrun; P. Lecomte; J. Lecoq; P. Le Coultre; I. Leedom; A. Lger; F. Lehmann; L. Leistam; R. Leiste; E. Lejeune; B. Leoni; J. Lettry; X. Leytens; C. Li; H.T. Li; L. Li; P.J. Li; X.G. Li; J.Y. Liao; Z.Y. Lin; F.L. Linde; D. Linnhfer; E. Loftin; W. Lohmann; S. Lks; E. Longo; Y.S. Lu; J.M. Lubbers; K. Lbelsmeyer; C. Luci; D. Luckey; X. Lue; L. Luminari; G. Lunadei; F. Lrken; H. Ma; W.G. Ma; M. MacDermott; N. Madjar; R. Magahiz; M. Maire; P.K. Malhotra; A. Malinin; C. Mana; F. Manna; G. Manto; Y.F. Mao; M. Maolinbay; P. Marchesini; A. Marchionni; M. Markwalder; P. Marsden; J.P. Martin; L. Martinez; H.U. Martyn; F. Marzano; V. Marzullo; F. Masciocchi; G.G.G. Massaro; L. Massonnet; T. Matsuda; G. Maurelli; K. Mazumdar; P. McBride; G. Medici; H. Meier; Th. Meinholz; M. Merk; R. Mermod; L. Merola; M. Meschini; W.J. Metzger; M. Micke; U. Micke; G.B. Mills; J. Mnich; M. Moeller; A. Molinero; L. Montanet; B. Monteleoni; R. Montino; G. Morand; R. Morand; S. Morganti; V. Morgunov; R. Mount; M. Moynot; P. Mugnier; W. Ngeli; E. Nagy; M. Napolitano; S. Neboux; H. Newman; Ch. Neyer; K. Nguyen; L. Niessen; A. Nikitin; W.D. Nowak; M. Okle; P. Olmos; J. Onvlee; D. Osborne; J. Ossmann; D. Pandoulas; H. Paprotny; A. Parmentola; G. Passeggio; G. Paternoster; S. Patricelli; Y.J. Pei; Y. Peng; Y. Peng; D. Perret-Gallix; J. Perrier; E. Perrin; G. Perrot; P. Petitpas; P. Petschner

1990-01-01T23:59:59.000Z

368

Construction Project Safety and Health Plan RM  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Project Safety and Construction Project Safety and Health Plan Review Module March 2010 CD-0 Co 0 Le OFFICE O onstructi CD-1 This Review ssons learned f OF ENVIRO Standard ion Proje Rev Critical D CD-2 M w Module has b from the pilot h ONMENTA Review Pla ect Safety view Modul Decision (CD CD March 2010 been piloted at have been inco AL MANAG an (SRP) y and He le D) Applicabili D-3 the INL IWTU orporated in Re GEMENT alth Plan ity CD-4 U Project. eview Module. n Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of Environmental Management (EM) projects are identified early and addressed proactively. The internal EM

369

Portsmouth and Paducah Construction Workers Needs Assessment  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Needs Assessment for Needs Assessment for Medical Screening of Construction Workers at the Portsmouth and Paducah Gaseous Diffusion Plants Introduction In 1993 the U.S. Congress enacted Section 3162 of the Defense Authorization Act, which directed the Department of Energy (DOE) to initiate programs to evaluate the health of former DOE defense nuclear facility workers. Consistent with the mandate to DOE from Congress, this project implements a notification, health evaluation (including medical screening) and intervention program for former building and construction trades workers at the DOE Oak Ridge, TN site and the Gaseous Diffusion Plants (GDP) at Portsmouth, OH and Paducah, KY, who may have been exposed to health hazards as a result of work at these sites. Based on congressional language, current workers at GDP's may request

370

Contacts for Integrating Renewable Energy into Federal Construction Projects  

Energy.gov (U.S. Department of Energy (DOE))

Contacts to learn more about integrating renewable energy technologies into Federal construction projects.

371

Plants in constructed wetlands help to treat agricultural processing wastewater  

E-Print Network (OSTI)

Plants in constructed wetlands help to treat agriculturalhas been available to help guide that selection. We

Grismer, Mark E; Shepherd, Heather L

2011-01-01T23:59:59.000Z

372

ADVANCES IN FORCE FIELD TAILORING FOR CONSTRUCTION IN SPACE  

E-Print Network (OSTI)

economy. The complete validation and refinement of the technique for large-scale construction in deep

373

Types of Lighting in Commercial Buildings - Building Size and Year  

U.S. Energy Information Administration (EIA) Indexed Site

Lighting and Building Size and Year Constructed Lighting and Building Size and Year Constructed Building Size Smaller commercial buildings are much more numerous than larger commercial buildings, but comprise less total floorspace-the 1,001 to 5,000 square feet category includes more than half of total buildings, but just 11 percent of total floorspace. In contrast, just 5 percent of buildings are larger than 50,000 square feet, but they account for half of total floorspace. Lighting consumes 38 percent of total site electricity. Larger buildings consume relatively more electricity for lighting than smaller buildings. Nearly half (47%) of electricity is consumed by lighting in the largest buildings (larger than 500,000 square feet). In the smallest buildings (1,001 to 5,000 square feet), one-fourth of electricity goes to lighting

374

Constructibility review process framework for transportation facilities  

E-Print Network (OSTI)

. 49 5. CRITICAL ISSUES REI. ATED TO CONSTRUCTIBILITY . . . . . 51 5. 1 Questionnaire Results . 5. 2 Observations Regarding Critical Issues. . 6. THE IDEFO MODELING TECHNIQUE 6. 1 Historical Background 6. 2 IDEF Modeling Entities.... . . . . . . . . . . . 6. 3 Structure of IDEFO Model. 6. 4 IDEFO Labeling Conventions. 6. 5 Data Flow. 6. 6 Example . 51 . 62 . 68 . 69 . 70 . 71 73 . 74 7. PROJECT DEVELOPMENT PROCESS. . 7. 1 Source of Information 7. 2 Development of the Project Development...

Liman, Majed

2012-06-07T23:59:59.000Z

375

Advanced materials for flexible pipe construction  

SciTech Connect

New materials have been developed for use in the construction of non-bonded flexible pipe for offshore oil and gas production in sever environmental conditions. Internal environmental conditions include high conveyed fluid temperatures with sour and waxy production fluids. External environmental conditions include low water temperatures and water depths of up to 2,000 m. In this paper, the results of test to verify the suitability of materials developed by Wellstream and its vendors specifically for these severe applications is presented.

Kalman, M.D.; Belcher, J.R.; Plaia, J.R. [Wellstream Company, L.P., Panama City, FL (United States). Dept. of Engineering

1995-10-01T23:59:59.000Z

376

Standard information system for construction management  

E-Print Network (OSTI)

of the Internet with public domain from the Extranet used by the partners, and from the Intranet, which is available only to a company' s permanent employees. The Construction Industry Institute (CII) at the University of Texas at Austin has done a... compatibility problems; 5. User-friendliness and clearness of XML documents (Walsh 1998) Virtual Private Networks Virtual Private Networks (VPN) use the Internet to securely link two or more private networks (Intranets) . VPN consist of 'tunnels' created...

Sultanbekov, Kanat A

2012-06-07T23:59:59.000Z

377

The construction of the Browns Bay Vessel  

E-Print Network (OSTI)

INVESTIGATIVE TECHNIQUES. 10 19 The Site. National Historic Sites Service Excavation and Raising of the Vessel Vessel on Display. The Vessel in 1985. 19 20 27 28 Method of Recording III THE CONSTRUCTION OF THE VESSEL 31 36 The Keel 36 The Stem... A flat-bottomed boat being built. 17 9 Forelocked eye-bolts from the midship beam of the Browne Bay Vessel 21 10 Broad arrow stamped in an eye-bolt from the Browns Bay Vessel. . . . . . . . . . . . . . . . . . . . . . . . . . . 22 11 Pulley...

Amer, Christopher Francis

2012-06-07T23:59:59.000Z

378

400A Construction Schedule | Advanced Photon Source  

NLE Websites -- All DOE Office Websites (Extended Search)

27-ID and 35-ID 27-ID and 35-ID Past 27-ID and 35-ID Long Range Schedule (pdf) 27-ID and 35-ID Past Construction Past 27-ID and 35-ID Construction Day Activity Impact Week of 06.11.13 35-ID-D panels arrive, 35-ID-C panel installation complete. Start installation of 35-ID-D. -/- Week of 06.13.13 DCS/RIXS Construction Progress Meeting, LOM 438-C010, 9AM -/- Week of 06.18.13 27-ID-A panels arrive -/- Week of 06.25.13 first shipment of 35-ID-E panels arrives -/- Week of 06.03.13 continue installation of 35-ID-C panels, doors, roof and floor trim Low Week of 05.20.13 35-ID-C panels arrive begin installation of 35-ID-C wall and roof panels Low Week of 05.13.13 completion of 35-ID-B roof panels, installation of lead trim, steel capping and door installation. Low Tuesday - 03.05.13

379

Constructing Hydraulic Barriers in Deep Geologic Formations  

SciTech Connect

Many construction methods have been developed to create hydraulic barriers to depths of 30 to 50 meters, but few have been proposed for depths on the order of 500 meters. For these deep hydraulic barriers, most methods are potentially feasible for soil but not for hard rock. In the course of researching methods of isolating large subterranean blocks of oil shale, the authors have developed a wax thermal permeation method for constructing hydraulic barriers in rock to depths of over 500 meters in competent or even fractured rock as well as soil. The technology is similar to freeze wall methods, but produces a permanent barrier; and is potentially applicable in both dry and water saturated formations. Like freeze wall barriers, the wax thermal permeation method utilizes a large number of vertical or horizontal boreholes around the perimeter to be contained. However, instead of cooling the boreholes, they are heated. After heating these boreholes, a specially formulated molten wax based grout is pumped into the boreholes where it seals fractures and also permeates radially outward to form a series of columns of wax-impregnated rock. Rows of overlapping columns can then form a durable hydraulic barrier. These barriers can also be angled above a geologic repository to help prevent influx of water due to atypical rainfall events. Applications of the technique to constructing containment structures around existing shallow waste burial sites and water shutoff for mining are also described. (authors)

Carter, E.E.; Carter, P.E. [Technologies Co, Texas (United States); Cooper, D.C. [Ph.D. Idaho National Laboratory, Idaho Falls, ID (United States)

2008-07-01T23:59:59.000Z

380

Black Hills Energy (Gas) - Residential New Construction Rebate Program |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Black Hills Energy (Gas) - Residential New Construction Rebate Black Hills Energy (Gas) - Residential New Construction Rebate Program Black Hills Energy (Gas) - Residential New Construction Rebate Program < Back Eligibility Construction Residential Savings Category Appliances & Electronics Heating & Cooling Home Weatherization Construction Commercial Weatherization Commercial Heating & Cooling Design & Remodeling Other Program Info State Iowa Program Type Utility Rebate Program Rebate Amount Builder Incentive: $800 - $2300 Provider Black Hills Energy Black Hills Energy offers new construction rebates for home builders in the eligible service area. Rebates between $800 and $5,000 are available for a range of efficiency measures incorporated into home construction. Qualifying homes must use natural gas and meet the minimum efficiency

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

CRAD, Nuclear Facility Construction - Structural Steel, May 29, 2009 |  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Steel, May 29, Steel, May 29, 2009 CRAD, Nuclear Facility Construction - Structural Steel, May 29, 2009 May 29, 2009 Nuclear Facility Construction - Structural Steel (HSS CRAD 64-16, Rev. 0) Nuclear Facility Construction - Structural Steel criteria, review, and approach document, observes construction activities and review records and design documentation to assess the quality of structural steel fabrication and erection and to determine if requirements specified by design basis documents, contracts, and applicable codes and standards have been met. CRAD, Nuclear Facility Construction - Structural Steel, May 29, 2009 More Documents & Publications CRAD, Nuclear Facility Construction - Structural Concrete, May 29, 2009 CRAD, Nuclear Facility Construction - Mechanical Equipment - June 26, 2012

382

Guide to Integrating Renewable Energy in Federal Construction: Training  

NLE Websites -- All DOE Office Websites (Extended Search)

Training to someone by E-mail Training to someone by E-mail Share Guide to Integrating Renewable Energy in Federal Construction: Training on Facebook Tweet about Guide to Integrating Renewable Energy in Federal Construction: Training on Twitter Bookmark Guide to Integrating Renewable Energy in Federal Construction: Training on Google Bookmark Guide to Integrating Renewable Energy in Federal Construction: Training on Delicious Rank Guide to Integrating Renewable Energy in Federal Construction: Training on Digg Find More places to share Guide to Integrating Renewable Energy in Federal Construction: Training on AddThis.com... Home Introduction Assessing Renewable Energy Options Planning, Programming, & Budgeting Project Funding Building Design Project Construction Commissioning Operations & Maintenance

383

Guide to Integrating Renewable Energy in Federal Construction: Outreach  

NLE Websites -- All DOE Office Websites (Extended Search)

Outreach to someone by E-mail Outreach to someone by E-mail Share Guide to Integrating Renewable Energy in Federal Construction: Outreach on Facebook Tweet about Guide to Integrating Renewable Energy in Federal Construction: Outreach on Twitter Bookmark Guide to Integrating Renewable Energy in Federal Construction: Outreach on Google Bookmark Guide to Integrating Renewable Energy in Federal Construction: Outreach on Delicious Rank Guide to Integrating Renewable Energy in Federal Construction: Outreach on Digg Find More places to share Guide to Integrating Renewable Energy in Federal Construction: Outreach on AddThis.com... Home Introduction Assessing Renewable Energy Options Planning, Programming, & Budgeting Project Funding Building Design Project Construction Commissioning Operations & Maintenance

384

Guide to Integrating Renewable Energy in Federal Construction: Resources  

NLE Websites -- All DOE Office Websites (Extended Search)

Resources to someone by E-mail Resources to someone by E-mail Share Guide to Integrating Renewable Energy in Federal Construction: Resources on Facebook Tweet about Guide to Integrating Renewable Energy in Federal Construction: Resources on Twitter Bookmark Guide to Integrating Renewable Energy in Federal Construction: Resources on Google Bookmark Guide to Integrating Renewable Energy in Federal Construction: Resources on Delicious Rank Guide to Integrating Renewable Energy in Federal Construction: Resources on Digg Find More places to share Guide to Integrating Renewable Energy in Federal Construction: Resources on AddThis.com... Home Introduction Assessing Renewable Energy Options Planning, Programming, & Budgeting Project Funding Building Design Project Construction Commissioning Operations & Maintenance

385

Buildings Energy Data Book: 1.3 Value of Construction and Research  

Buildings Energy Data Book (EERE)

7 7 Buildings Design and Construction Trades, by Year | | | 1980 | 1982 14.4 1990 | 1987 38.4 2000 (4) | 1992 36.3 2005 | 1997 46.6 2006 | 2002 95.4 2007 | 2007 52.4 2008 | 2009 | 2010 | Note(s): Source(s): 1) Does not include industrial building or heavy construction (e.g., dam and bridge building). In 1999, 76% of the employment shown is considered for "production." The entire U.S. construction industry employs an estimated 10 million people, including manufacturing. 2) In 2000, NAHB report having 200,000 members, one-third of which were builders. 3) Excludes homebuilding establishments without payrolls, estimated by NAHB at an additional 210,000 in 1992. 4) NAHB reports that 2,448 full-time jobs in construction and related industries are generated from the construction of every 1,000 single-family homes and 1,030 jobs are created from the construction of every 1,000 multi-

386

Construction of an embankment with a fly and bottom ash mixture: field performance study  

SciTech Connect

Fly ash and bottom ash are coal combustion by-products (CCBPs) that are generated in large quantities throughout the world. It is often economical to dispose ash as mixtures rather than separately; that notwithstanding, only a few studies have been performed to investigate the behavior of fly and bottom ash mixtures, particularly those with high contents of fly ash. Also, there is very limited data available in the literature on the field performance of structures constructed using ash mixtures. This paper describes the construction and the instrumentation of a demonstration embankment built with an ash mixture (60:40 by weight of fly ash:bottom ash) on State Road 641, Terre Haute, Ind. Monitoring of the demonstration embankment was conducted for a period of 1 year from the start of construction of the embankment. The settlement of the embankment stabilized approximately 5 months after the end of its construction. According to horizontal inclinometer readings, the differential settlement at the top of the embankment is about 5 mm. Results from field quality control tests performed during construction of the demonstration embankment and monitoring data from vertical and horizontal inclinometers and settlement plates indicate that the ash mixture investigated can be considered an acceptable embankment construction material.

Yoon, S.; Balunaini, U.; Yildirim, I.Z.; Prezzi, M.; Siddiki, N.Z. [Louisiana Transportation Research Center, Baton Rouge, LA (United States)

2009-06-15T23:59:59.000Z

387

Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Final Report  

SciTech Connect

Final report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Mockups applied to design review of AP600/1000, Construction planning for AP 600, and AP 1000 maintenance evaluation. Proof of concept study also performed for GenIV PBMR models.

Timothy Shaw; Anthony Baratta; Vaughn Whisker

2005-02-28T23:59:59.000Z

388

Small Employer Quality Jobs 7-Year Cash Incentive (Oklahoma) | Department  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Employer Quality Jobs 7-Year Cash Incentive (Oklahoma) Employer Quality Jobs 7-Year Cash Incentive (Oklahoma) Small Employer Quality Jobs 7-Year Cash Incentive (Oklahoma) < Back Eligibility Agricultural Commercial Construction Fuel Distributor Industrial Installer/Contractor Investor-Owned Utility Municipal/Public Utility Nonprofit Retail Supplier Rural Electric Cooperative Systems Integrator Transportation Utility Savings Category Alternative Fuel Vehicles Hydrogen & Fuel Cells Buying & Making Electricity Home Weatherization Water Solar Wind Program Info State Oklahoma Program Type Grant Program Performance-Based Incentive Provider Oklahoma Department of Commerce This program provides incentive payments to a qualifying small employer (90 employees or less). The payments may reach as high as 5% of new taxable payroll and last for up to seven years. Annual salaries must meet at least

389

Fiscal Year 2012 Congressional Budget  

Office of Energy Efficiency and Renewable Energy (EERE)

The Fiscal Year 2012 Congressional Budget of the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

390

One Year Passport to Success  

Energy.gov (U.S. Department of Energy (DOE))

Describes the framework for the Department's on-boarding program for a new employee from day one through their first year.

391

Fiscal Year 2011 Congressional Budget  

Office of Energy Efficiency and Renewable Energy (EERE)

The Fiscal Year 2011 Congressional Budget of the U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

392

Lasers: The First Fifty Years  

SciTech Connect

This year marks the 50th anniversary of the invention of the laser. The Optical Society of America is publishing this feature issue to celebrate this auspicious birthday.

Boyd, Robert W.; Athale, Ravindra; Onural, Levent; Seka, Wolf

2010-09-01T23:59:59.000Z

393

Yearly  

E-Print Network (OSTI)

In 2009, a new activity was launched under the International Energy Agency Wind Implementing Agreement (IEA Wind) for the small wind sector. The main focus of this activity, called Task 27, is to develop recommended practices for consumer labeling of existing commercial small wind turbines. Participants will also exchange information about the status of the small wind industry in the member countries. This report outlines the status of the small wind sector in 2009 in the countries participating in Task 27. (For more information about IEA Wind and the consumer label developed under Task 27, see www.ieawind.org.)

unknown authors

2009-01-01T23:59:59.000Z

394

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 10 White Female (W F) 2 DIVERSITY TOTAL WORKFORCE GENDER Associate...

395

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 5 Asian Male 0 Asian Female 0 Hispanic Male 0 Hispanic Female 3 White Male 9 White Female 1 Workforce Diversity Office of the Administrator (NA-1) As of...

396

YEAR  

National Nuclear Security Administration (NNSA)

American Female 2 Asian Male 2 Asian Female 0 Hispanic Male 13 Hispanic Female 17 White Male 37 White Female 17 DIVERSITY GENDER Workforce Diversity Sandia Site Office As of...

397

YEAR  

National Nuclear Security Administration (NNSA)

American Female 6 Asian Male 0 Asian Female 0 Hispanic Male 7 Hispanic Female 18 White Male 40 White Female 25 DIVERSITY GENDER Workforce Diversity As of March 24, 2012 PAY...

398

YEAR  

National Nuclear Security Administration (NNSA)

(AAPI,F) 2 2 0.00% Hispanic Male (H,M) 6 6 0.00% Hispanic Female (H,F) 6 6 0.00% White Male (W,M) 53 50 -5.66% White Female (W,F) 19 13 -31.58% Change DIVERSITY...

399

YEAR  

National Nuclear Security Administration (NNSA)

American Female 39 Asian Male 4 Asian Female 5 Hispanic Male 20 Hispanic Female 50 White Male 57 White Female 84 DIVERSITY Workforce Diversity Associate Administrator for...

400

YEAR  

National Nuclear Security Administration (NNSA)

American Female 43 Asian Male 3 Asian Female 4 Hispanic Male 21 Hispanic Female 47 White Male 61 White Female 92 DIVERSITY Workforce Diversity Associate Administrator for...

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 4 White Female (W F) 5 DIVERSITY TOTAL WORKFORCE GENDER Associate...

402

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 25 Hispanic Male (H M) 202 Hispanic Female (H F) 177 White Male (W M) 1244 White Female (W F) 453 Total includes 2425 permanent and 21 temporary...

403

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 1 Hispanic Male (H, M) 5 Hispanic Female (H, F) 6 White Male (W, M) 75 White Female (W, F) 32 TOTAL WORKFORCE GENDER NNSA Production Office...

404

YEAR  

National Nuclear Security Administration (NNSA)

American Female 19 Asian Male 9 Asian Female 5 Hispanic Male 18 Hispanic Female 12 White Male 101 White Female 49 DIVERSITY Workforce Diversity Immediate Office of the Deputy...

405

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 5 Hispanic Female (H F) 3 White Male (W M) 30 White Female (W F) 3 DIVERSITY TOTAL WORKFORCE GENDER Associate...

406

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 3 Hispanic Male (H M) 15 Hispanic Female (H F) 33 White Male (W M) 44 White Female (W F) 68 DIVERSITY TOTAL WORKFORCE GENDER Associate...

407

YEAR  

National Nuclear Security Administration (NNSA)

0 0 0.00% Hispanic Male (H,M) 12 12 0.00% Hispanic Female (H,F) 12 11 -8.33% White Male (W,M) 34 34 0.00% White Female (W,F) 17 16 -5.88% Change DIVERSITY Change...

408

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 5 Hispanic Female (H F) 3 White Male (W M) 26 White Female (W F) 16 DIVERSITY TOTAL WORKFORCE GENDER Livermore Field...

409

YEAR  

National Nuclear Security Administration (NNSA)

American Female 1 Asian Male 9 Asian Female 2 Hispanic Male 75 Hispanic Female 21 White Male 400 White Female 19 DIVERSITY Workforce Diversity Assistant Deputy Administrator...

410

YEAR  

National Nuclear Security Administration (NNSA)

3 2 -33.33% Hispanic Male (H,M) 5 5 0.00% Hispanic Female (H,F) 4 4 0.00% White Male (W,M) 29 26 -10.34% White Female (W,F) 19 16 -15.79% Change DIVERSITY...

411

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 4 Hispanic Female (H F) 7 White Male (W M) 13 White Female (W F) 11 DIVERSITY TOTAL WORKFORCE GENDER Office of General...

412

YEAR  

National Nuclear Security Administration (NNSA)

(AAPI,F) 1 1 0.00% Hispanic Male (H,M) 5 5 0.00% Hispanic Female (H,F) 6 6 0.00% White Male (W,M) 85 71 -16.47% White Female (W,F) 33 30 -9.09% Change DIVERSITY...

413

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 1 Asian Male 2 Asian Female 0 Hispanic Male 4 Hispanic Female 3 White Male 29 White Female 3 Workforce Diversity Associate Administrator for Safety & Health...

414

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 2 Hispanic Male (H, M) 74 Hispanic Female (H, F) 22 White Male (W, M) 393 White Female (W, F) 19 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER...

415

YEAR  

National Nuclear Security Administration (NNSA)

American Female 4 Asian Male 22 Asian Female 4 Hispanic Male 5 Hispanic Female 4 White Male 30 White Female 19 Workforce Diversity Livermore Site Office As of March 24, 2012...

416

YEAR  

National Nuclear Security Administration (NNSA)

American Female 7 Asian Male 3 Asian Female 0 Hispanic Male 23 Hispanic Female 24 White Male 36 White Female 35 DIVERSITY Workforce Diversity Associate Administrator for...

417

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 0 Hispanic Male (H, M) 12 Hispanic Female (H, F) 11 White Male (W, M) 34 White Female (W, F) 16 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER Sandia...

418

YEAR  

National Nuclear Security Administration (NNSA)

Hispanic Male (H,M) 217 207 -4.61% Hispanic Female (H,F) 196 182 -7.14% White Male (W,M) 1318 1271 -3.57% White Female (W,F) 511 463 -9.39% Total includes...

419

YEAR  

National Nuclear Security Administration (NNSA)

American Female 158 Asian Male 79 Asian Female 29 Hispanic Male 220 Hispanic Female 202 White Male 1340 White Female 519 Workforce Diversity National Nuclear Security...

420

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 13 White Female (W F) 5 DIVERSITY TOTAL WORKFORCE GENDER Savannah River...

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 76 Hispanic Female (H F) 21 White Male (W M) 401 White Female (W F) 20 DIVERSITY TOTAL WORKFORCE GENDER Assistant Deputy...

422

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 3 Hispanic Female (H F) 5 White Male (W M) 43 White Female (W F) 10 DIVERSITY TOTAL WORKFORCE GENDER Associate...

423

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 12 Hispanic Female (H F) 12 White Male (W M) 34 White Female (W F) 16 DIVERSITY TOTAL WORKFORCE GENDER Sandia Field...

424

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 1 Asian Male 2 Asian Female 0 Hispanic Male 5 Hispanic Female 3 White Male 29 White Female 5 DIVERSITY Workforce Diversity Associate Administrator for...

425

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 0 Hispanic Female 0 White Male 14 White Female 8 DIVERSITY GENDER Workforce Diversity Savannah River Site Office...

426

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 25 Hispanic Female (H F) 25 White Male (W M) 61 White Female (W F) 41 DIVERSITY TOTAL WORKFORCE GENDER Associate...

427

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 2 Hispanic Female (H F) 0 White Male (W M) 154 White Female (W F) 71 * Total numbers are combined. NA-30 total numbers...

428

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 2 Hispanic Female (H F) 6 White Male (W M) 10 White Female (W F) 3 DIVERSITY TOTAL WORKFORCE GENDER Associate...

429

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 0 Hispanic Male (H, M) 1 Hispanic Female (H, F) 0 White Male (W, M) 25 White Female (W, F) 6 TOTAL WORKFORCE GENDER Kansas City Field Office...

430

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 7 Hispanic Male (H M) 7 Hispanic Female (H F) 10 White Male (W M) 82 White Female (W F) 60 DIVERSITY TOTAL WORKFORCE GENDER Deputy...

431

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 3 Asian Male 1 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 5 White Female 6 DIVERSITY Workforce Diversity Associate Administrator of...

432

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 2 Hispanic Male (H M) 12 Hispanic Female (H F) 7 White Male (W M) 66 White Female (W F) 22 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER Deputy...

433

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 2 Asian Male 3 Asian Female 0 Hispanic Male 5 Hispanic Female 5 White Male 44 White Female 13 Workforce Diversity Pantex Site Office As of March 24, 2012...

434

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 2 Asian Male 1 Asian Female 0 Hispanic Male 0 Hispanic Female 0 White Male 8 White Female 3 DIVERSITY Workforce Diversity As of March 24, 2012 PAY PLAN...

435

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 2 Hispanic Male (H, M) 5 Hispanic Female (H, F) 4 White Male (W, M) 25 White Female (W, F) 17 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER...

436

YEAR  

National Nuclear Security Administration (NNSA)

2 2 0.00% Hispanic Male (H,M) 76 75 -1.32% Hispanic Female (H,F) 22 21 -4.55% White Male (W,M) 389 400 2.83% White Female (W,F) 21 19 -9.52% Change DIVERSITY...

437

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 2 Hispanic Male (H, M) 6 Hispanic Female (H, F) 6 White Male (W, M) 51 White Female (W, F) 14 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER Nevada...

438

YEAR  

National Nuclear Security Administration (NNSA)

American Female 11 Asian Male 2 Asian Female 1 Hispanic Male 3 Hispanic Female 6 White Male 50 White Female 11 DIVERSITY GENDER Workforce Diversity Associate Administrator...

439

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 6 Hispanic Female (H F) 14 White Male (W M) 39 White Female (W F) 21 DIVERSITY TOTAL WORKFORCE GENDER Associate...

440

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 4 Asian Male 2 Asian Female 3 Hispanic Male 7 Hispanic Female 5 White Male 52 White Female 20 Workforce Diversity Nevada Site Office As of March 24, 2012...

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 2 Asian Male 1 Asian Female 1 Hispanic Male 6 Hispanic Female 9 White Male 13 White Female 10 Workforce Diversity Office of General Counsel (NA-GC) As of...

442

YEAR  

National Nuclear Security Administration (NNSA)

American Female 6 Asian Male 0 Asian Female 0 Hispanic Male 7 Hispanic Female 18 White Male 40 White Female 28 DIVERSITY Workforce Diversity Associate Administrator for...

443

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI, F) 0 Hispanic Male (H, M) 0 Hispanic Female (H, F) 0 White Male (W, M) 15 White Female (W, F) 7 TOTAL WORKFORCE GENDER Savannah River Field...

444

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 8 Asian Male 3 Asian Female 1 Hispanic Male 1 Hispanic Female 0 White Male 76 White Female 22 DIVERSITY Workforce Diversity Deputy Administrator for Naval...

445

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 5 Asian Male 3 Asian Female 1 Hispanic Male 0 Hispanic Female 1 White Male 46 White Female 22 Workforce Diversity Y-12 Site Office As of March 24, 2012 PAY...

446

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 0 White Male (W M) 24 White Female (W F) 6 TOTAL WORKFORCE GENDER Kansas City Field Office As...

447

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 4 Asian Male 0 Asian Female 0 Hispanic Male 1 Hispanic Female 0 White Male 28 White Female 6 Workforce Diversity Kansas City Site Office As of March 24,...

448

YEAR  

National Nuclear Security Administration (NNSA)

African American Female 8 Asian Male 1 Asian Female 0 Hispanic Male 2 Hispanic Female 6 White Male 11 White Female 5 DIVERSITY Workforce Diversity Associate Administrator for...

449

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 0 Hispanic Male (H M) 0 Hispanic Female (H F) 3 White Male (W M) 7 White Female (W F) 1 PAY PLAN DIVERSITY TOTAL WORKFORCE GENDER National...

450

YEAR  

National Nuclear Security Administration (NNSA)

(AAPI,F) 0 0 0.00% Hispanic Male (H,M) 1 1 0.00% Hispanic Female (H,F) 0 0 0.00% White Male (W,M) 27 25 -7.41% White Female (W,F) 6 6 0.00% Change DIVERSITY Change...

451

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 4 Hispanic Male (H M) 3 Hispanic Female (H F) 6 White Male (W M) 26 White Female (W F) 18 TOTAL WORKFORCE GENDER Associate Administrator for...

452

YEAR  

National Nuclear Security Administration (NNSA)

Pacific Islander Female (AAPI F) 1 Hispanic Male (H M) 6 Hispanic Female (H F) 6 White Male (W M) 68 White Female (W F) 30 DIVERSITY TOTAL WORKFORCE GENDER NNSA Production...

453

Proton therapy construction projects in the United States  

SciTech Connect

Proton and heavy-ion radiation therapy has been taking place now for 40 years, at many accelerator laboratories around the world, essentially all of these centers built originally for physics research. The high degree of promise shown for using these particles for treating and curing cancer has stimulated the medical community to look seriously at building dedicated accelerator facilities in a hospital setting, where more rapid progress can be made in clinical research, and development of effective treatments with these beams. In the United States, the first such facility, at the Loma Linda University Medical Center, has been in operation now for two years, and is currently treating a total of 35 to 40 patients per day. Two new projects are being designed at present, one at the Massachusetts General Hospital in Boston, Massachusetts, the second a joint project of the Lawrence Berkeley Laboratory and the University of California at Davis Medical Center in Sacramento, California. This paper will discuss accelerator and beam characteristics relevant to the proton-therapy application, and will present performance and operations characteristics for the Loma Linda facility, as well as details of the plans, process and progress towards construction of the new facilities in Boston and Sacramento.

Alonso, J.R.

1992-11-01T23:59:59.000Z

454

Dangerous and severe personality disorder: An investigation of the construct  

Science Journals Connector (OSTI)

Introduction of the construct Dangerous and Severe Personality Disorder (DSPD) by the UK Home Office and Department of Health has provoked strong debate and opposition. Its aims and that of proposed subsequent legislation was to enhance public protection by identifying and detaining a minority of persons with severe personality disorder who pose a high risk of serious sexual/violent offending. The most serious criticism was the ethical implication of allowing indefinite detention of people without criminal convictions. More recently, policy emphasis has shifted towards treatment. 1396 male prisoners serving sentences of 2+years for sexual/violent offenses were prospectively interviewed (personality disorders, psychopathy, and risk) at a mean follow-up of 2years. The prevalence of DSPD was 15%. Significantly more re-offended. Five DSPD offenders would need treatment to prevent one violent act. Based on an estimate of attributable risk, successful treatment of DSPD could reduce violent re-convictions among DSPD offenders by 71% and violent/sexual re-offenses in the prison population by 27%. DSPD criteria correctly identify high risk prisoners but primarily through risk-related demographic features. DSPD does not accurately identify serious sexual/violent re-offenders. The DSPD programme may reduce major violent re-offending if treatment interventions prove effective.

Simone Ullrich; Min Yang; Jeremy Coid

2010-01-01T23:59:59.000Z

455

Implementation of SAFT + Cubic, PC-SAFT, and SoaveBenedictWebbRubin Equations of State for Comprehensive Description of Thermodynamic Properties in Binary and Ternary Mixtures of CH4, CO2, and n-C16H34  

Science Journals Connector (OSTI)

Implementation of SAFT + Cubic, PC-SAFT, and SoaveBenedictWebbRubin Equations of State for Comprehensive Description of Thermodynamic Properties in Binary and Ternary Mixtures of CH4, CO2, and n-C16H34 ... The recently proposed SAFT + Cubic EoS passes this test relatively successfully (AAD% for the single phase properties less than 6%), proving its robustness as a predictive tool. ... PC-SAFT appears to be the less reliable estimator of the data, whose AAD% might exceed 22%. ...

Ilya Polishuk

2011-11-09T23:59:59.000Z

456

Venice data > year = 1931:1981  

E-Print Network (OSTI)

:3,] year r1 1 1931 103 2 1932 78 3 1933 121 > attach(venice) ## > plot(year,r1) > lm(r1 ~ year) Call: lm(formula = r1 ~ year) #12;Coefficients: (Intercept) year -989.382 0.567 > lm(r1 ~ year - mean(year)) ## Error differ (found for 'mean(year)') ### > lm(r1 ~ I(year - mean(year))) Call: lm(formula = r1 ~ I(year - mean

Reid, Nancy

457

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

Charts Income Back http://www.fin.mmu.ac.uk/f18_004b.htm06/07/2004 12:57:08 #12;5 Year Financial Profile - Charts - zoom 5 Year Financial Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_004c.htm06 http://www.fin.mmu.ac.uk/f18_004d.htm06/07/2004 12:57:19 #12;5 Year Financial Profile - Charts - zoom 5

458

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

Charts Income Back http://www.fin.mmu.ac.uk/f18_008b.htm06/07/2004 12:51:21 #12;5 Year Financial Profile - Charts - zoom 5 Year Financial Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_008c.htm06 http://www.fin.mmu.ac.uk/f18_008d.htm06/07/2004 12:51:31 #12;5 Year Financial Profile - Charts - zoom 5

459

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

Charts Income Back http://www.fin.mmu.ac.uk/f18_010b.htm06/07/2004 10:57:23 #12;5 Year Financial Profile - Charts - zoom 5 Year Financial Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_010c.htm06 http://www.fin.mmu.ac.uk/f18_010d.htm06/07/2004 12:40:15 #12;5 Year Financial Profile - Charts - zoom 5

460

ASME post construction pressure technology codes  

SciTech Connect

The need to continue to operate pressurized equipment and other facilities in a safe, reliable and cost effective manner has led to the development of many new approaches to in-service inspection, flaw evaluation, and repair. Interest on the part of users, regulatory authorities and others in standardizing these approaches has led to the formation of a new ASME Main Committee on Post Construction under the Board on Pressure Technology Codes and Standards, and a new Division of the Pressure Vessel Research Council on Continued Operation of Equipment. This paper provides a brief overview of these activities.

Sims, J.R. [Exxon Research and Engineering Co., Florham Park, NJ (United States)

1996-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Neural network construction via back-propagation  

SciTech Connect

A method is presented that combines back-propagation with multi-layer neural network construction. Back-propagation is used not only to adjust the weights but also the signal functions. Going from one network to an equivalent one that has additional linear units, the non-linearity of these units and thus their effective presence is then introduced via back-propagation (weight-splitting). The back-propagated error causes the network to include new units in order to minimize the error function. We also show how this formalism allows to escape local minima.

Burwick, T.T.

1994-06-01T23:59:59.000Z

462

Hades: The Construction of a Graphic Novel  

E-Print Network (OSTI)

33 Hades: The Construction of a Graphic Novel Bethany Christiansen Hades is a short graphic novel that reinterprets the sixth chapter of James Joyces Ulysses in light of Dantes Inferno. Descent into a pit, animal symbolism, guilt... acquaintance, Paddy Dignam. As they travel, Blooms convoluted internal narrative touches on subjects such as suicide, the death of his infant son, his estranged wife, and the many forms and consequences of death. I chose to do Hades as a graphic novel...

Christiansen, Bethany

2011-04-01T23:59:59.000Z

463

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

. Income Expenditure Assets Liabilities & Reserves http://www.fin.mmu.ac.uk/f18_0067.htm06/07/2004 13 Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_006b.htm06/07/2004 13:04:46 #12;5 Year Financial Profile - Charts - Assets 5 Year Financial Profile Charts Assets Back http://www.fin.mmu.ac.uk/f18

464

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

. Income Expenditure Assets Liabilities Income Breakdown Expenditure Breakdown http://www.fin.mmu.ac.uk/f18 Charts Income Back http://www.fin.mmu.ac.uk/f18_005b.htm06/07/2004 13:00:29 #12;5 Year Financial Profile - Charts - zoom 5 Year Financial Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_005c.htm06

465

5 Year Financial Profile -Charts 5 Year Financial Profile Charts  

E-Print Network (OSTI)

. Income Expenditure Assets Liabilities & Reserves http://www.fin.mmu.ac.uk/f18_0079.htm06/07/2004 13 Profile Charts Expenditure Back http://www.fin.mmu.ac.uk/f18_007b.htm06/07/2004 13:05:59 #12;5 Year Financial Profile - Charts - Assets 5 Year Financial Profile Charts Assets Back http://www.fin.mmu.ac.uk/f18

466

Guidance on New Construction under an Energy Savings Performance Contract  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Guidance on New Construction under an Energy Savings Performance Guidance on New Construction under an Energy Savings Performance Contract November 2013 This document provides guidance on the limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. 2 Guidance on "New" Construction under an Energy Savings Performance Contract Subject: Limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. Summary: In general, an ESPC must be used for the energy efficiency improvement and retrofit of exisiting Federal buildings. An ESPC may be used for the construction of "new" buildings under an ESPC only under limited circumstances:

467

Guidance on New Construction under an Energy Savings Performance Contract  

NLE Websites -- All DOE Office Websites (Extended Search)

Guidance on New Construction under an Energy Savings Performance Guidance on New Construction under an Energy Savings Performance Contract November 2013 This document provides guidance on the limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. 2 Guidance on "New" Construction under an Energy Savings Performance Contract Subject: Limitations on the use of an energy savings performance contract (ESPC) for the construction of a "new" building. Summary: In general, an ESPC must be used for the energy efficiency improvement and retrofit of exisiting Federal buildings. An ESPC may be used for the construction of "new" buildings under an ESPC only under limited circumstances:

468

FAQS Qualification Card - Construction Management | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Construction Management Construction Management FAQS Qualification Card - Construction Management A key element for the Department's Technical Qualification Programs is a set of common Functional Area Qualification Standards (FAQS) and associated Job Task Analyses (JTA). These standards are developed for various functional areas of responsibility in the Department, including oversight of safety management programs identified as hazard controls in Documented Safety Analyses (DSA). For each functional area, the FAQS identify the minimum technical competencies and supporting knowledge and skills for a typical qualified individual working in the area. FAQC-ConstructionManagement.docx Description Construction Management Qualification Card More Documents & Publications FAQS Gap Analysis Qualification Card - Construction Management

469

Illumina Unamplified Indexed Library Construction: An Automated Approach  

SciTech Connect

Manual library construction is a limiting factor in Illumina sequencing. Constructing libraries by hand is costly, time-consuming, low-throughput, and ergonomically hazardous, and constructing multiple libraries introduces risk of library failure due to pipetting errors. The ability to construct multiple libraries simultaneously in automated fashion represents significant cost and time savings. Here we present a strategy to construct up to 96 unamplified indexed libraries using Illumina TruSeq reagents and a Biomek FX robotic platform. We also present data to indicate that this library construction method has little or no risk of cross-contamination between samples.

Hack, Christopher A.; Sczyrba, Alexander; Cheng, Jan-Fang

2011-03-21T23:59:59.000Z

470

Guide to Integrating Renewable Energy in Federal Construction: Major  

NLE Websites -- All DOE Office Websites (Extended Search)

Major Renovations to someone by E-mail Major Renovations to someone by E-mail Share Guide to Integrating Renewable Energy in Federal Construction: Major Renovations on Facebook Tweet about Guide to Integrating Renewable Energy in Federal Construction: Major Renovations on Twitter Bookmark Guide to Integrating Renewable Energy in Federal Construction: Major Renovations on Google Bookmark Guide to Integrating Renewable Energy in Federal Construction: Major Renovations on Delicious Rank Guide to Integrating Renewable Energy in Federal Construction: Major Renovations on Digg Find More places to share Guide to Integrating Renewable Energy in Federal Construction: Major Renovations on AddThis.com... Home Introduction Assessing Renewable Energy Options Planning, Programming, & Budgeting Project Funding

471

70 Images for 70 Years  

NLE Websites -- All DOE Office Websites (Extended Search)

70 Images for 70 Years 70 Images for 70 Years 70 Images for 70 Years Los Alamos has a proud history and heritage of almost 70 years of science and innovation. The people of the Laboratory work on advanced technologies to provide the best scientific and engineering solutions to many of the nation's most crucial security challenges. Click thumbnails to enlarge. Photos arranged by most recent first, horizontal formats before vertical. See Flickr for more sizes and details. 1938 Hahn and Meitner Fission 1938 Hahn and Meitner Fission 1939 Einstein-Szilard 1939 Einstein-Szilard 1940s Main Guard Gate (671938) 1940s Main Guard Gate (671938) 1940s Security check 1940s Security check 1940 Boys Ranch School hockey on Ashley Pond 1940 Boys Ranch School hockey on Ashley Pond 1942 Fuller Lodge 1942 Fuller Lodge

472

WIPP_Marks_12_Years  

NLE Websites -- All DOE Office Websites (Extended Search)

Marks 12 Years of Operations CARLSBAD, N.M., March 28, 2011 - On Saturday, March 26, 2011, the Department of Energy's Waste Isolation Pilot Plant marked another anniversary. It has...

473

Accountability report - fiscal year 1997  

SciTech Connect

This document contains the US NRC`s accountability report for fiscal year 1997. Topics include uses of funds, financial condition, program performance, management accountability, and the audited financial statement.

NONE

1998-04-01T23:59:59.000Z

474

Myths of the Year 2000  

Science Journals Connector (OSTI)

......system monitoring nuclear waste storage recommended the release of radioactive waste several years too early...and 2000. If there is long-term disruption at the end of...few days and building new storage tanks will take time......

M. Thomas

1998-01-01T23:59:59.000Z

475

Chapeau! First-Year French  

E-Print Network (OSTI)

Chapeau! is a first-year college text. Although it may appear, at first glance, o move very fast and introduce a large amount of material early, the vocabulary and grammatical structures that we expect students to control ...

Dinneen, David A.; Kernen, Madeleine

1989-01-01T23:59:59.000Z

476

NIST 3-Year Programmatic Plan  

E-Print Network (OSTI)

areas critical to the nation's economy.The America COMPETES Act outlines major roles for NIST-year period.NIST will continue to refine this plan as it works with the Administration to address national

477

Federal Energy Management Program: FDA Construction Project Serves as a  

NLE Websites -- All DOE Office Websites (Extended Search)

FDA Construction FDA Construction Project Serves as a Super ESPC Model to someone by E-mail Share Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Facebook Tweet about Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Twitter Bookmark Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Google Bookmark Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Delicious Rank Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on Digg Find More places to share Federal Energy Management Program: FDA Construction Project Serves as a Super ESPC Model on AddThis.com... Energy Savings Performance Contracts

478

China Nuclear Engineering Construction Corporation CNEC | Open Energy  

Open Energy Info (EERE)

Engineering Construction Corporation CNEC Engineering Construction Corporation CNEC Jump to: navigation, search Name China Nuclear Engineering & Construction Corporation (CNEC) Place Beijing, China Zip 100840 Product CNEC conducts engineering, construction, research and design, finance and trade activities related to nuclear power. References China Nuclear Engineering & Construction Corporation (CNEC)[1] LinkedIn Connections CrunchBase Profile No CrunchBase profile. Create one now! This article is a stub. You can help OpenEI by expanding it. China Nuclear Engineering & Construction Corporation (CNEC) is a company located in Beijing, China . References ↑ "China Nuclear Engineering & Construction Corporation (CNEC)" Retrieved from "http://en.openei.org/w/index.php?title=China_Nuclear_Engineering_Construction_Corporation_CNEC&oldid=343517"

479

GRR/Section 6 - Construction Permits Overview | Open Energy Information  

Open Energy Info (EERE)

6 - Construction Permits Overview 6 - Construction Permits Overview < GRR Jump to: navigation, search GRR-logo.png GEOTHERMAL REGULATORY ROADMAP Roadmap Home Roadmap Help List of Sections Section 6 - Construction Permits Overview 06 - ConstructionPermitsOverview.pdf Click to View Fullscreen Triggers None specified Click "Edit With Form" above to add content 06 - ConstructionPermitsOverview.pdf 06 - ConstructionPermitsOverview.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number not in range. Flowchart Narrative Constructing a geothermal power plant requires numerous permits from Federal, state, and local governments, related to transporting construction materials, encroaching upon Federal and state right-of-ways, demolishing existing structures and building new structures.

480

The design of a panelized roof system for residential construction  

E-Print Network (OSTI)

The cost of housing in the U.S. continues to rise faster than household income. Innovative building materials and construction technologies have the potential to reduce housing construction costs. One strategy to do this ...

Dentz, Jordan Lewis

1991-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "nc year constructed" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

About the Design & Construction Collaborative Life Sciences Building & Skourtes Tower  

E-Print Network (OSTI)

About the Design & Construction Collaborative Life Sciences Building & Skourtes Tower With an emphasis on connection, the inter-disciplinary, multi-institutional building's design reflects its. Anticipating LEED Platinum rating, the building incorporated sustainable construction practices, including div

Chapman, Michael S.

482

Application of lean enterprise concept to construction firms in Japan  

E-Print Network (OSTI)

Construction firms in Japan are struggling with the change in construction industry environment and need a new business model to meet the change. On the other hand, Japanese manufacturing companies, especially automobile ...

Taguchi, Hiroshi, 1973-

2004-01-01T23:59:59.000Z

483

SC COLLABORATOR: A SERVICE ORIENTED FRAMEWORK FOR CONSTRUCTION SUPPLY CHAIN  

E-Print Network (OSTI)

, service oriented architecture (SOA) with open source technologies is a desirable computing modelSC COLLABORATOR: A SERVICE ORIENTED FRAMEWORK FOR CONSTRUCTION SUPPLY CHAIN COLLABORATION for construction supply chain collaboration and management, through a prototype service oriented system framework

Stanford University

484

Floodplain and Wetlands Assessment for Construction of a Second...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

associated with the bridge and road construction. Additionally, the possibility of sediment run-off or erosion could occur as a result of a storm during the construction period....

485

National Safety Stand-Down To Prevent Falls In Construction ...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Safety Stand-Down To Prevent Falls In Construction National Safety Stand-Down To Prevent Falls In Construction June 2, 2014 - 1:54pm Addthis National Safety Stand-Down To Prevent...

486

Automated crack control analysis for concrete pavement construction  

E-Print Network (OSTI)

The focus of this research is on the control of random cracking in concrete paving by using sawcut notch locations in the early stages of construction. This is a major concern in concrete pavement construction. This research also addresses a...

Jang, Se Hoon

2005-11-01T23:59:59.000Z

487

THE PENNSYLVANIA STATE UNIVERSITY HANKIN CHAIR IN RESIDENTIAL BUILDING CONSTRUCTION  

E-Print Network (OSTI)

research in the areas of residential building design and construction, sustainable buildings, energy issues in residential buildings, lifecycle analysis of buildings and related infrastructure, and sustainable landTHE PENNSYLVANIA STATE UNIVERSITY HANKIN CHAIR IN RESIDENTIAL BUILDING CONSTRUCTION The College

Guiltinan, Mark

488

Consent Order, URS Energy & Construction, Inc.- NCO-2011-02  

Energy.gov (U.S. Department of Energy (DOE))

Issued to URS Energy & Construction, Inc., related to Quality Improvement and Work Control Program Deficiencies associated with Construction of the Sodium Bearing Waste Treatment Project at the Idaho National Laboratory

489

Automated construction technologies : analyses and future development strategies  

E-Print Network (OSTI)

Substandard productivity and the lack of skilled workers in the construction industry have led major corporations all over the world aiming to produce various types of automated construction technologies. During the process, ...

Hoang, Han (Han Mai)

2005-01-01T23:59:59.000Z

490

Master of Architecture Bylaws School of Architecture and Construction Management  

E-Print Network (OSTI)

Master of Architecture Bylaws School of Architecture and Construction Management Washington State University Administrative Home: School of Architecture and Construction Management I. Objectives Degrees offered: Master of Architecture: Professional Accredited Degree. Discipline: Architecture is a general

Collins, Gary S.

491

CDPHE Construction Storm Water Forms | Open Energy Information  

Open Energy Info (EERE)

CDPHE Construction Storm Water Forms Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: CDPHE Construction Storm Water FormsLegal...

492

Construction of transmission lines above valuable standing timber  

Science Journals Connector (OSTI)

Problems with the construction of transmission lines above a forest are examined. Construction of lines above standing timber makes it possible to shorten the length of the route, eliminate the clearing of a cont...

L. O. Aizenberg; E. A. Khvoles

2007-11-01T23:59:59.000Z

493

World Year of Physics 2005  

NLE Websites -- All DOE Office Websites (Extended Search)

IMAGE: World Year of Physics 2005 nameplate Berkeley Lab logo Berkeley Lab Celebrates World Year of Physics 2005 Berkeley Lab Web Search Berkeley Lab Phone Book Berkeley Lab A-Z Index Berkeley Lab Privacy and Security Notice IMAGE: World Year of Physics 2005 nameplate Berkeley Lab logo Berkeley Lab Celebrates World Year of Physics 2005 Berkeley Lab Web Search Berkeley Lab Phone Book Berkeley Lab A-Z Index Berkeley Lab Privacy and Security Notice IMAGE: World of Physics graphic Symposia page link Special Events page link Lectures page link Education page link The World Year of Physics is a worldwide celebration of physics and its importance in our everyday lives. Physics not only plays an important role in the development of science and technology but also has a tremendous impact on our society. WYP aims to raise the worldwide awareness of physics and physical science. The United Nations has declared 2005 to be the International Year of Physics. This declaration coincides with the 100th anniversary of physicist

494

Electronic Construction Coordination with AutoCAD  

E-Print Network (OSTI)

and nonspecific to the desired topic. Background of development of AutoCAD AutoCAD is a three dimensional design software package developed by Autodesk. The first version was released in 1982. In the past 25 years, there have been 21 major revisions. John Walker, the founder of Autodesk...

Neal, Christopher

2007-12-14T23:59:59.000Z

495

Indoor airPLUS Construction Specifications Version 1 (Rev. 02)  

Energy.gov (U.S. Department of Energy (DOE))

Indoor airPLUS Construction Specifications Version 1 (Rev. 02), November 2013, from the U.S. Environmental Protection Agency.

496

Nuclear Power 2010 Program: Combined Construction and Operating...  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design...

497

Architecture, Engineering and Construction Sustainability Report Biannual Sustainability Report  

E-Print Network (OSTI)

Architecture, Engineering and Construction Sustainability Report i Biannual Sustainability Report Projects $5 Million and Over August 2012 Active Projects

Kamat, Vineet R.

498

Solar Construction Permitting Standards | Department of Energy  

Energy.gov (U.S. Department of Energy (DOE)) Indexed Site

Standards Standards Solar Construction Permitting Standards < Back Eligibility Agricultural Commercial General Public/Consumer Industrial Local Government Nonprofit Residential Savings Category Solar Buying & Making Electricity Heating & Cooling Water Heating Program Info State Colorado Program Type Solar/Wind Permitting Standards Provider Colorado Energy Office Owners of solar photovoltaic (PV) systems and solar water heating systems in Colorado are required to obtain a building permit before their systems may be installed. Permits are handled at the local level and awarded by counties and municipalities. Traditionally, counties and municipalities have been free to assign their own fees for a permit. These fees can vary broadly in size across jurisdictions and in some cases, can be large enough

499

Chapter 15: Commercial New Construction Protocol  

SciTech Connect

This protocol is intended to describe the recommended method when evaluating the whole-building performance of new construction projects in the commercial sector. The protocol focuses on energy conservation measures (ECMs) measures (or packages of measures) where evaluators can best analyze impacts using building simulation. These ECMs typically require the use of calibrated building simulations under Option D of the International Performance Measurement and Verification Protocol. Examples of such measures include Leadership in Energy and Environmental Design building certification, novel and/or efficient heating, ventilation, and air conditioning system designs, and extensive building controls systems. In general, it is best to evaluate any ECM (or set of measures) expected to significantly interact with other systems within the building and with savings sensitive to seasonal variations in weather.

Keates, S.

2014-09-01T23:59:59.000Z

500

Decisions in thesaurus construction and use  

Science Journals Connector (OSTI)

A thesaurus and an ontology provide a set of structured terms, phrases, and metadata, often in a hierarchical arrangement, that may be used to index, search, and mine documents. We describe the decisions that should be made when including a term, deciding whether a term should be subdivided into its subclasses, or determining which of more than one set of possible subclasses should be used. Based on retrospective measurements or estimates of future performance when using thesaurus terms in document ordering, decisions are made so as to maximize performance. These decisions may be used in the automatic construction of a thesaurus. The evaluation of an existing thesaurus is described, consistent with the decision criteria developed here. These kinds of user-focused decision-theoretic techniques may be applied to other hierarchical applications, such as faceted classification systems used in information architecture or the use of hierarchical terms in breadcrumb navigation.

Robert M. Losee

2007-01-01T23:59:59.000Z