1

Naval Reactors Facility Environmental Monitoring Report, Calendar Year 2003  

SciTech Connect (OSTI)

The results of the radiological and nonradiological environmental monitoring programs for 2003 at the Naval Reactors Facility are presented in this report. The results obtained from the environmental monitoring programs verify that releases to the environment from operations at NRF were in accordance with Federal and State regulations. Evaluation of the environmental data confirms that the operation of NRF continues to have no adverse effect on the quality of the environment or the health and safety of the general public. Furthermore, a conservative assessment of radiation exposure to the general public as a result of NRF operations demonstrated that the dose received by any member of the public was well below the most restrictive dose limits prescribed by the U.S. Environmental Protection Agency and the U.S. Department of Energy.

None

2003-12-31T23:59:59.000Z

2

naval reactors  

National Nuclear Security Administration (NNSA)

After operating for 34 years and training over 14,000 sailors, the Department of Energy S1C Prototype Reactor Site in Windsor, Connecticut, was returned to "green field"...

3

Reactor Safety Planning for Prometheus Project, for Naval Reactors Information  

SciTech Connect (OSTI)

The purpose of this letter is to submit to Naval Reactors the initial plan for the Prometheus project Reactor Safety work. The Prometheus project is currently developing plans for cold physics experiments and reactor prototype tests. These tests and facilities may require safety analysis and siting support. In addition to the ground facilities, the flight reactor units will require unique analyses to evaluate the risk to the public from normal operations and credible accident conditions. This letter outlines major safety documents that will be submitted with estimated deliverable dates. Included in this planning is the reactor servicing documentation and shipping analysis that will be submitted to Naval Reactors.

P. Delmolino

2005-05-06T23:59:59.000Z

4

Accident Investigation of the June 17, 2012, Construction Accident- Structural Steel Collapse at The Over pack Storage Expansion #2 at the Naval Reactors Facility at the Idaho National Laboratory, Idaho Falls, Idaho  

Broader source: Energy.gov [DOE]

This report documents the Naval Reactors investigation into the collapse ofa partially-erected spent fuel storage building, Overpack Storage Expansion #2 (OSE2), at the Naval Reactors Facility. The Accident Investigation Board inspected the scene, collected physical and photographic evidence, interviewed involved personnel, and reviewed relevant documents to determine the key causes of the accident. Based on the information gathered during the investigation, the Board identified several engineering and safety deficiencies that need to be addressed to prevent recurrence.

5

About Naval Reactors | National Nuclear Security Administration  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

fleet to remain on station is further enhanced by our ability to forward-deploy repair and maintenance activities. Schools and Training Facilities The Naval Nuclear...

6

Management of Naval Reactors' Cyber Security Program, OIG-0884  

Broader source: Energy.gov (indexed) [DOE]

Naval Reactors' Naval Reactors' Cyber Security Program DOE/IG-0884 April 2013 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 April 12, 2013 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Management of Naval Reactors' Cyber Security Program" INTRODUCTION AND OBJECTIVE The Naval Reactors Program (Naval Reactors), an organization within the National Nuclear Security Administration, provides the military with safe and reliable nuclear propulsion plants to power warships and submarines. Naval Reactors maintains responsibility for activities supporting the United States Naval fleet nuclear propulsion systems, including research and

7

2014 Annual Planning Summary for the NNSA Naval Reactors  

Broader source: Energy.gov [DOE]

The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the NNSA Naval Reactors.

8

Audit Report - Naval Reactors Information Technology System Development Efforts, IG-0879  

Broader source: Energy.gov (indexed) [DOE]

Naval Reactors Information Naval Reactors Information Technology System Development Efforts DOE/IG-0879 December 2012 U.S. Department of Energy Office of Inspector General Office of Audits & Inspections Department of Energy Washington, DC 20585 December 21, 2012 MEMORANDUM FOR THE ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on the "Naval Reactors Information Technology System Development Efforts" INTRODUCTION AND OBJECTIVE The Naval Reactors Program (Naval Reactors), an organization within the National Nuclear Security Administration, was established to provide the military with safe and reliable nuclear propulsion plants to power warships and submarines. Naval Reactors maintains responsibility

9

Tag: Naval Reactors | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Naval Reactors Naval Reactors Tag: Naval Reactors Displaying 1 - 7 of 7... Category: Employees & Retirees "Cook"ing at Y-12 for 70 years We have an enduring mission. Y-12 plays a key role in it. And a nuclear deterrent remains the ultimate insurance policy for America. More... Category: News Y-12 Knows Uranium Y-12 produces many forms of uranium. More... Category: News A Rich Resource Requires Recovery Given the value and scarcity of enriched uranium, Y-12 recycles and reuses as much of it as possible. More... Category: News Seawolf Manufacturing Challenge For decades, attack submarines were either fast or quiet - but never both. The fast subs were so loud that an enemy could hear them long before they were within striking distance. More... Category: News Reliable fuel source

10

Statement on Defense Nuclear Nonproliferation and Naval Reactors Activities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Defense Nuclear Nonproliferation and Naval Reactors Activities Defense Nuclear Nonproliferation and Naval Reactors Activities before the House Committee on Appropriations Subcommittee on Energy & Water Development | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Congressional Testimony > Statement on Defense Nuclear

11

Statement on Defense Nuclear Nonproliferation and Naval Reactors Activities  

National Nuclear Security Administration (NNSA)

Defense Nuclear Nonproliferation and Naval Reactors Activities Defense Nuclear Nonproliferation and Naval Reactors Activities before the House Committee on Appropriations Subcommittee on Energy & Water Development | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Congressional Testimony > Statement on Defense Nuclear

12

EA-1889: Disposal of Decommissioned, Defueled Naval Reactor Plants from USS  

Broader source: Energy.gov (indexed) [DOE]

89: Disposal of Decommissioned, Defueled Naval Reactor Plants 89: Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) at the Hanford Site, Richland, Washington EA-1889: Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) at the Hanford Site, Richland, Washington Summary This EA, prepared by the Department of the Navy, evaluates the environmental impacts of the disposal of decommissioned, defueled, naval reactor plants from the USS Enterprise at DOE's Hanford Site, Richland, Washington. DOE participated as a cooperating agency in the preparation of this EA. The Department of the Navy issued its FONSI on August 23, 2012. Public Comment Opportunities No public comment opportunities available at this time. Documents Available for Download August 23, 2012

13

September 10, 2003, Board Public Meeting - Naval Reactors Approach to Oversight  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 4 25 22 As I previously mentioned this morning, we will receive testimony from experienced representatives from other organizations. First, I would like to welcome representatives from the U.S. Naval Sea Systems Command, Mr. Thomas Beckett and Mr. Storm Kauffman. If you would be kind enough to give your names and titles so the stenographer can identify you for the record. MR. BECKETT: Thank you, Mr. Chairman. Thomas H. Beckett. I ' m the Deputy Director for Naval Reactors, a joint Department of the Navy/Department of Energy Program. MR. KAUFFMAN: Storm Kauffman. I ' m the Director of Reactor Safety and Analysis for the Naval Reactors Program CHAIRMAN CONWAY: Mr. Beckett. MR. BECKETT: Thank you, Mr. Chairman, and let me thank you and the other Board Members f

14

PIA - Advanced Test Reactor National Scientific User Facility...  

Energy Savers [EERE]

Advanced Test Reactor National Scientific User Facility Users Week 2009 PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009 PIA - Advanced Test Reactor...

15

University of Virginia Reactor Facility Decommissioning Results  

SciTech Connect (OSTI)

The University of Virginia Reactor Facility started accelerated decommissioning in 2002. The facility consists of two licensed reactors, the CAVALIER and the UVAR. This paper will describe the progress in 2002, remaining efforts and the unique organizational structure of the project team.

Ervin, P. F.; Lundberg, L. A.; Benneche, P. E.; Mulder, R. U.; Steva, D. P.

2003-02-24T23:59:59.000Z

16

Reconnaissance of geothermal resources near US naval facilities in the San Diego area, California  

SciTech Connect (OSTI)

A reconnaissance study has found little evidence of potential geothermal resources useful at naval facilities in the greater San Diego metropolitan area. However, there is a zone of modest elevated water well temperatures and slightly elevated thermal gradients that may include the eastern portion of the Imperial Beach Naval Air Station south of San Diego Bay. An increase of 0.3/sup 0/ to 0.4/sup 0/F/100 ft over the regional thermal gradient of 1.56/sup 0/F/100 ft was conservatively calculated for this zone. The thermal gradient can be used to predict 150/sup 0/F temperatures at a depth of approximately 4000 ft. This zone of greatest potential for a viable geothermal resource lies within a negative gravity anomaly thought to be caused by a tensionally developed graben, approximately centered over the San Diego Bay. Water well production in this zone is good to high, with 300 gpm often quoted as common for wells in this area. The concentration of total dissolved solids (TDS) in the deeper wells in this zone is relatively high due to intrusion of sea water. Productive geothermal wells may have to be drilled to depths economically infeasible for development of the resource in the area of discussion.

Youngs, L.G.

1984-01-01T23:59:59.000Z

17

Advanced Test Reactor National Scientific User Facility  

SciTech Connect (OSTI)

The Advanced Test Reactor (ATR), at the Idaho National Laboratory (INL), is a large test reactor for providing the capability for studying the effects of intense neutron and gamma radiation on reactor materials and fuels. The ATR is a pressurized, light-water, high flux test reactor with a maximum operating power of 250 MWth. The INL also has several hot cells and other laboratories in which irradiated material can be examined to study material irradiation effects. In 2007 the US Department of Energy (DOE) designated the ATR as a National Scientific User Facility (NSUF) to facilitate greater access to the ATR and the associated INL laboratories for material testing research by a broader user community. This paper highlights the ATR NSUF research program and the associated educational initiatives.

Frances M. Marshall; Jeff Benson; Mary Catherine Thelen

2011-08-01T23:59:59.000Z

18

CRAD, Nuclear Reactor Facility Operations - December 4, 2014...  

Energy Savers [EERE]

Nuclear Reactor Facility Operations - December 4, 2014 (EA CRAD 31-08, Rev. 0) CRAD, Nuclear Reactor Facility Operations - December 4, 2014 (EA CRAD 31-08, Rev. 0) December 4, 2014...

19

Ames Laboratory Research Reactor Facility Ames, Iowa  

Office of Legacy Management (LM)

,, *' ; . Final Radiological Condition of the Ames Laboratory Research Reactor Facility Ames, Iowa _, . AGENCY: Office of Operational Safety, Department of Energy ' ACTION: Notice of Availability of Archival Information Package SUMMARY: The'Office of Operational Safety of the Department O i Energy (DOE) has reviewed documentation relating to the decontamination and decommissioning operations conducted at the Ames Laboratory Research Reactor Facility, Ames, Iowa and has prepared an archival informati0.n package to permanently document the results of the action and the site conditions and use restriction placed on the . site at the tim e of release. This review is based on post-decontamination survey data and other pertinent documentation referenced in and included in the archival package. The material and

20

Sandia National Laboratories: Research: Facilities: Sandia Pulsed Reactor  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Sandia Pulsed Reactor Facility - Critical Experiments Sandia Pulsed Reactor Facility - Critical Experiments Sandia scientist John Ford places fuel rods in the Seven Percent Critical Experiment (7uPCX) at the Sandia Pulsed Reactor Facility Critical Experiments (SPRF/CX) test reactor - a reactor stripped down to its simplest form. The Sandia Pulsed Reactor Facility - Critical Experiments (SPRF/CX) provides a flexible, shielded location for performing critical experiments that employ different reactor core configurations and fuel types. The facility is also available for hands-on nuclear criticality safety training. Research and other activities The 7% series, an evaluation of various core characteristics for higher commercial-fuel enrichment, is currently under way at the SPRF/CX. Past critical experiments at the SPRF/CX have included the Burnup Credit

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Former Reactor Facilities Surveillance and Maintenance and  

E-Print Network [OSTI]

and Dark (2010) Majority of remaining radiation contained in reactor vessel (inside biological shield window damage Minor roof leaks to former office areas Stack and Grounds: Stack drain tank Safety of confinement dome Replaced exhaust fan Security system hardware/software upgrade BGRR: Covered vents above 2

Ohta, Shigemi

22

Naval Station Newport Wind Resource Assessment. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites, and The Naval Facilities Engineering Service Center  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Naval Station Newport Naval Station Newport Wind Resource Assessment A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites, and The Naval Facilities Engineering Service Center Robi Robichaud, Jason Fields, and Joseph Owen Roberts Technical Report NREL/TP-6A20-52801 February 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401 303-275-3000 * www.nrel.gov Contract No. DE-AC36-08GO28308 Naval Station Newport

23

Tag: Naval Reactors  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

9/all en "Cook"ing at Y-12 for 70 9/all en "Cook"ing at Y-12 for 70 years http://www.y12.doe.gov/employees-retirees/y-12-times/cooking-y-12-70-years

We have an enduring mission. Y-12 plays a key role in it. And a nuclear deterrent remains the ultimate insurance policy for America.

Advanced Test Reactor National Scientific User Facility Partnerships  

SciTech Connect (OSTI)

In 2007, the United States Department of Energy designated the Advanced Test Reactor (ATR), located at Idaho National Laboratory, as a National Scientific User Facility (NSUF). This designation made test space within the ATR and post-irradiation examination (PIE) equipment at INL available for use by researchers via a proposal and peer review process. The goal of the ATR NSUF is to provide researchers with the best ideas access to the most advanced test capability, regardless of the proposer's physical location. Since 2007, the ATR NSUF has expanded its available reactor test space, and obtained access to additional PIE equipment. Recognizing that INL may not have all the desired PIE equipment, or that some equipment may become oversubscribed, the ATR NSUF established a Partnership Program. This program enables and facilitates user access to several university and national laboratories. So far, seven universities and one national laboratory have been added to the ATR NSUF with capability that includes reactor-testing space, PIE equipment, and ion beam irradiation facilities. With the addition of these universities, irradiation can occur in multiple reactors and post-irradiation exams can be performed at multiple universities. In each case, the choice of facilities is based on the user's technical needs. Universities and laboratories included in the ATR NSUF partnership program are as follows: (1) Nuclear Services Laboratories at North Carolina State University; (2) PULSTAR Reactor Facility at North Carolina State University; (3) Michigan Ion Beam Laboratory (1.7 MV Tandetron accelerator) at the University of Michigan; (4) Irradiated Materials at the University of Michigan; (5) Harry Reid Center Radiochemistry Laboratories at University of Nevada, Las Vegas; (6) Characterization Laboratory for Irradiated Materials at the University of Wisconsin-Madison; (7) Tandem Accelerator Ion Beam. (1.7 MV terminal voltage tandem ion accelerator) at the University of Wisconsin-Madison; (8) Illinois Institute of Technology (IIT) Materials Research Collaborative Access Team (MRCAT) beamline at Argonne National Laboratory's Advanced Photon Source; and (9) Nanoindenter in the University of California at Berkeley (UCB) Nuclear Engineering laboratory Materials have been analyzed for ATR NSUF users at the Advanced Photon Source at the MRCAT beam, the NIST Center for Neutron Research in Gaithersburg, MD, the Los Alamos Neutron Science Center, and the SHaRE user facility at Oak Ridge National Laboratory (ORNL). Additionally, ORNL has been accepted as a partner facility to enable ATR NSUF users to access the facilities at the High Flux Isotope Reactor and related facilities.

Frances M. Marshall; Todd R. Allen; Jeff B. Benson; James I. Cole; Mary Catherine Thelen

2012-03-01T23:59:59.000Z

25

The Advanced Test Reactor National Scientific User Facility  

SciTech Connect (OSTI)

In 2007, the Advanced Test Reactor (ATR), located at Idaho National Laboratory (INL), was designated by the Department of Energy (DOE) as a National Scientific User Facility (NSUF). This designation made test space within the ATR and post-irradiation examination (PIE) equipment at INL available for use by approved researchers via a proposal and peer review process. The goal of the ATR NSUF is to provide those researchers with the best ideas access to the most advanced test capability, regardless of the proposer’s physical location. Since 2007, the ATR NSUF has expanded its available reactor test space, obtained access to additional PIE equipment, taken steps to enable the most advanced post-irradiation analysis possible, and initiated an educational program and digital learning library to help potential users better understand the critical issues in reactor technology and how a test reactor facility could be used to address this critical research. Recognizing that INL may not have all the desired PIE equipment, or that some equipment may become oversubscribed, the ATR NSUF established a Partnership Program. This program invited universities to nominate their capability to become part of a broader user facility. Any university is eligible to self-nominate. Any nomination is then peer reviewed to ensure that the addition of the university facilities adds useful capability to the NSUF. Once added to the NSUF team, the university capability is then integral to the NSUF operations and is available to all users via the proposal process. So far, six universities have been added to the ATR NSUF with capability that includes reactor-testing space, PIE equipment, and ion beam irradiation facilities. With the addition of these university capabilities, irradiation can occur in multiple reactors and post-irradiation exams can be performed at multiple universities. In each case, the choice of facilities is based on the user’s technical needs. The current NSUF partners are shown in Figure 1. This article describes the ATR as well as the expanded capabilities, partnerships, and services that allow researchers to take full advantage of this national resource.

Todd R. Allen; Collin J. Knight; Jeff B. Benson; Frances M. Marshall; Mitchell K. Meyer; Mary Catherine Thelen

2011-08-01T23:59:59.000Z

26

E-Print Network 3.0 - advanced test reactor critical facility...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Powered by Explorit Topic List Advanced Search Sample search results for: advanced test reactor critical facility Page: << < 1 2 3 4 5 > >> 1 Engineers at Western are...

27

Radiochemical characteristics of tritium to be considered in fusion reactor facility design  

Science Journals Connector (OSTI)

The results of research and development related to radiochemical characteristics of tritium to be considered in a fusion reactor facility design are summarized. Reactions induced by...

S. O’hira; T. Hayashi; W. Shu; T. Yamanishi

2007-06-01T23:59:59.000Z

28

EIS-0275: Disposal of the S1C Prototype Reactor Plant, Hanford Site, Richland, WA (Navy Document)  

Broader source: Energy.gov [DOE]

This EIS analyzes the Office of Naval Reactors (Naval Reactors) proposed action to dismantle the defueled S1C Prototype reactor plant.

29

Decontamination of the Plum Brook Reactor Facility Hot Cells  

SciTech Connect (OSTI)

The NASA Plum Brook Reactor Facility decommissioning project recently completed a major milestone with the successful decontamination of seven hot cells. The cells included thick concrete walls and leaded glass windows, manipulator arms, inter cell dividing walls, and roof slabs. There was also a significant amount of embedded conduit and piping that had to be cleaned and surveyed. Prior to work starting evaluation studies were performed to determine whether it was more cost effective to do this work using a full up removal approach (rip and ship) or to decontaminate the cells to below required clean up levels, leaving the bulk of the material in place. This paper looks at that decision process, how it was implemented, and the results of that effort including the huge volume of material that can now be used as fill during site restoration rather than being disposed of as LLRW. (authors)

Peecook, K.M. [NASA Glenn Research Center, Plum Brook Station, Sandusky, OH (United States)

2008-07-01T23:59:59.000Z

30

Parametric Thermal Models of the Transient Reactor Test Facility (TREAT)  

SciTech Connect (OSTI)

This work supports the restart of transient testing in the United States using the Department of Energy’s Transient Reactor Test Facility at the Idaho National Laboratory. It also supports the Global Threat Reduction Initiative by reducing proliferation risk of high enriched uranium fuel. The work involves the creation of a nuclear fuel assembly model using the fuel performance code known as BISON. The model simulates the thermal behavior of a nuclear fuel assembly during steady state and transient operational modes. Additional models of the same geometry but differing material properties are created to perform parametric studies. The results show that fuel and cladding thermal conductivity have the greatest effect on fuel temperature under the steady state operational mode. Fuel density and fuel specific heat have the greatest effect for transient operational model. When considering a new fuel type it is recommended to use materials that decrease the specific heat of the fuel and the thermal conductivity of the fuel’s cladding in order to deal with higher density fuels that accompany the LEU conversion process. Data on the latest operating conditions of TREAT need to be attained in order to validate BISON’s results. BISON’s models for TREAT (material models, boundary convection models) are modest and need additional work to ensure accuracy and confidence in results.

Bradley K. Heath

2014-03-01T23:59:59.000Z

31

Advanced Test Reactor (ATR) Facility 10CFR830 Safety Basis Related to Facility Experiments  

SciTech Connect (OSTI)

The Idaho National Engineering and Environmental Laboratory (INEEL) Advanced Test Reactor (ATR), a DOE Category A reactor, was designed to provide an irradiation test environment for conducting a variety of experiments. The ATR Safety Analysis Report, determined by DOE to meet the requirements of 10 CFR 830, Subpart B, provides versatility in types of experiments that may be conducted. This paper addresses two general types of experiments in the ATR facility and how safety analyses for experiments are related to the ATR safety basis. One type of experiment is more routine and generally represents greater risks; therefore this type of experiment is addressed with more detail in the safety basis. This allows individual safety analyses for these experiments to be more routine and repetitive. The second type of experiment is less defined and is permitted under more general controls. Therefore, individual safety analyses for the second type of experiment tend to be more unique from experiment to experiment. Experiments are also discussed relative to "major modifications" and DOE-STD-1027-92. Application of the USQ process to ATR experiments is also discussed.

Tomberlin, Terry Alan

2002-06-01T23:59:59.000Z

32

Advanced Test Reactor (ATR) Facility 10CFR830 Safety Basis Related to Facility Experiments  

SciTech Connect (OSTI)

The Idaho National Engineering and Environmental Laboratory (INEEL) Advanced Test Reactor (ATR), a DOE Category A reactor, was designed to provide an irradiation test environment for conducting a variety of experiments. The ATR Safety Analysis Report, determined by DOE to meet the requirements of 10 CFR 830, Subpart B, provides versatility in types of experiments that may be conducted. This paper addresses two general types of experiments in the ATR facility and how safety analyses for experiments are related to the ATR safety basis. One type of experiment is more routine and generally represents greater risks; therefore this type of experiment is addressed with more detail in the safety basis. This allows individual safety analyses for these experiments to be more routine and repetitive. The second type of experiment is less defined and is permitted under more general controls. Therefore, individual safety analyses for the second type of experiment tend to be more unique from experiment to experiment. Experiments are also discussed relative to ''major modifications'' and DOE-STD-1027-92. Application of the USQ process to ATR experiments is also discussed.

Tomberlin, T.A.

2002-06-19T23:59:59.000Z

33

Multiple Irradiation Capsule Experiment (MICE)-3B Irradiation Test of Space Fuel Specimens in the Advanced Test Reactor (ATR) - Close Out Documentation for Naval Reactors (NR) Information  

SciTech Connect (OSTI)

Few data exist for UO{sub 2} or UN within the notional design space for the Prometheus-1 reactor (low fission rate, high temperature, long duration). As such, basic testing is required to validate predictions (and in some cases determine) performance aspects of these fuels. Therefore, the MICE-3B test of UO{sub 2} pellets was designed to provide data on gas release, unrestrained swelling, and restrained swelling at the upper range of fission rates expected for a space reactor. These data would be compared with model predictions and used to determine adequacy of a space reactor design basis relative to fission gas release and swelling of UO{sub 2} fuel and to assess potential pellet-clad interactions. A primary goal of an irradiation test for UN fuel was to assess performance issues currently associated with this fuel type such as gas release, swelling and transient performance. Information learned from this effort may have enabled use of UN fuel for future applications.

M. Chen; CM Regan; D. Noe

2006-01-09T23:59:59.000Z

34

Workers Demolish Reactor Support Facility as Part of River Corridor Contract  

Broader source: Energy.gov [DOE]

RICHLAND, Wash. – EM’s Richland Operations Office and cleanup contractor Washington Closure Hanford recently completed the cleanout and demolition of the last reactor support facility as part of the River Corridor Closure Contract.

35

Design, construction and evaluation of a facility for the simulation of fast reactor blankets  

E-Print Network [OSTI]

A facility has been designed and constructed at the MIT Reactor for the experimental investigation of typical LMFBR breeding blankets. A large converter assembly, consisting of a 20-cm-thick layer of graphite followed by ...

Forbes, Ian Alexander

1970-01-01T23:59:59.000Z

36

The development and evaluation of a neutron window filter facility utilizing the TAMU NSC TRIGA reactor  

E-Print Network [OSTI]

THE DEVELOPMENT AND EVALUATION OF A NEUTRON WINDOW FILTER FACILITY UTILIZING THE TAMU NSC TRIGA REACTOR A Thesis by PATRICIA COLLEEN HARDING Submitted to the Graduate College of Texas AAM University in partial fulfillment of the requirement... for the degree of MASTER OF SCIENCE December 1982 Major Subject: Nuclear Engineering THE DEVELOPMENT AND EVALUATION OF A NEUTRON WINDOW FILTER FACILITY UTILIZING THE TAMU NSC TRIGA REACTOR A Thesis by PATRICIA COLLEEN HARDING Approved as to style...

Harding, Patricia Colleen

2012-06-07T23:59:59.000Z

37

Critical Facility for lattice physics experiments for the Advanced Heavy Water Reactor and the 500 MWe pressurized heavy water reactors  

Science Journals Connector (OSTI)

Bhabha Atomic Research Centre (BARC), Mumbai, is embarking on a broad based program for thorium utilization in power production to achieve all-round capability in the entire thorium cycle. As a step in this direction, a low power Critical Facility is under construction at BARC. The facility will greatly contribute to the understanding and validation of the calculational models and nuclear data used in the design of thorium based Advanced Heavy Water Reactor. The facility is also designed to cater to the experimental requirements of future lattice studies related to 500 MWe pressurized heavy water reactors. This paper covers the basic design features, safety aspects and the planned experimental program of the new facility.

V.K. Raina; R. Srivenkatesan; D.C. Khatri; D.K. Lahiri

2006-01-01T23:59:59.000Z

38

A review of experiments and results from the transient reactor test (TREAT) facility.  

SciTech Connect (OSTI)

The TREAT Facility was designed and built in the late 1950s at Argonne National Laboratory to provide a transient reactor for safety experiments on samples of reactor fuels. It first operated in 1959. Throughout its history, experiments conducted in TREAT have been important in establishing the behavior of a wide variety of reactor fuel elements under conditions predicted to occur in reactor accidents ranging from mild off normal transients to hypothetical core disruptive accidents. For much of its history, TREAT was used primarily to test liquid-metal reactor fuel elements, initially for the Experimental Breeder Reactor-II (EBR-II), then for the Fast Flux Test Facility (FFTF), the Clinch River Breeder Reactor Plant (CRBRP), the British Prototype Fast Reactor (PFR), and finally, for the Integral Fast Reactor (IFR). Both oxide and metal elements were tested in dry capsules and in flowing sodium loops. The data obtained were instrumental in establishing the behavior of the fuel under off-normal and accident conditions, a necessary part of the safety analysis of the various reactors. In addition, TREAT was used to test light-water reactor (LWR) elements in a steam environment to obtain fission-product release data under meltdown conditions. Studies are now under way on applications of TREAT to testing of the behavior of high-burnup LWR elements under reactivity-initiated accident (RIA) conditions using a high-pressure water loop.

Deitrich, L. W.

1998-07-28T23:59:59.000Z

39

Naval Engineering A National Naval Obligation  

E-Print Network [OSTI]

As part of its national obligations, ONR must ensure US world leadership in those unique technology areas that insure naval superiority. ONR accomplishes this mission through research, recruitment and education, maintaining ...

Chryssostomidis, Chryssostomos

2000-05-16T23:59:59.000Z

40

Decontamination of Hot Cells and Hot Pipe Tunnel at NASA's Plum Brook Reactor Facility  

SciTech Connect (OSTI)

The large scale decontamination of the concrete Hot Cells and Hot Pipe Tunnel at NASA's Plum Brook Reactor Facility demonstrates that novel management and innovative methods are crucial to ensuring that the successful remediation of the most contaminated facilities can be achieved with minimal risk to the project stakeholders. (authors)

Anderson, M.G.; Halishak, W.F. [MOTA Corporation, West Columbia, SC (United States)

2008-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

An analysis of decommissioning costs for the AFRRI TRIGA reactor facility  

SciTech Connect (OSTI)

A decommissioning cost analysis for the AFRRI TRIGA Reactor Facility was made. AFRRI is not at this time suggesting that the AFRRI TRIGA Reactor Facility be decommissioned. This report was prepared to be in compliance with paragraph 50.33 of Title 10, Code of Federal Regulations which requires the assurance of availability of future decommissioning funding. The planned method of decommissioning is the immediate decontamination of the AFRRI TRIGA Reactor site to allow for restoration of the site to full public access - this is called DECON. The cost of DECON for the AFRRI TRIGA Reactor Facility in 1990 dollars is estimated to be $3,200,000. The anticipated ancillary costs of facility site demobilization and spent fuel shipment is an additional $600,000. Thus the total cost of terminating reactor operations at AFRRI will be about $3,800,000. The primary basis for this cost estimate is a study of the decommissioning costs of a similar reactor facility that was performed by Battelle Pacific Northwest Laboratory (PNL) as provided in USNRC publication NUREG/CR-1756. The data in this study were adapted to reflect the decommissioning requirements of the AFRRI TRIGA. (author)

Forsbacka, Matt [Armed Forces Radiobiology Research Institute, Bethesda, MD (United States)

1990-07-01T23:59:59.000Z

42

Neutron Radiography Facilities Using Neutron Beams from Nuclear Reactors  

Science Journals Connector (OSTI)

The paper represents diagrams, descriptions and main technical characteristics of a number of Soviet neutron radiography facilities. The said facilieties for the ... inspection of the objects to be studied utiliz...

E. R. Kartashev

1983-01-01T23:59:59.000Z

43

Research Reactors and Radiation Facilities for Joint Use Program  

E-Print Network [OSTI]

Observatory, a facility of the Graduate School of Science of Kyoto University, was constructed in 1968's current main research target is to unveil the origin of the solar magnetic activities that govern science and technology, material science, radiation life science, and radiation medical science

Takada, Shoji

44

Early American Naval Sigint  

Science Journals Connector (OSTI)

After the Battle of Midway, Laurance Safford, The primary source on early USN Comint work is the booklet US Naval Communications Intelligence Activities by Laurance Safford, J. N. Wenger and at le...

Peter Donovan; John Mack

2014-01-01T23:59:59.000Z

45

Analyses in support of the Laboratory Microfusion Facility and ICF commercial reactor designs  

SciTech Connect (OSTI)

Our work on this contract was divided into two major categories; two thirds of the total effort was in support of the Laboratory Microfusion Facility (LMF), and one third of the effort was in support of Inertial Confinement Fusion (ICF) commercial reactors. This final report includes copies of the formal reports, memoranda, and viewgraph presentations that were completed under this contract.

Meier, W.R.; Monsler, M.J.

1988-12-28T23:59:59.000Z

46

Development of a Safeguards Approach for a Small Graphite Moderated Reactor and Associated Fuel Cycle Facilities  

E-Print Network [OSTI]

in it and how nuclear material flows between facilities. The goals of the safeguards system were established next, using the normal IAEA standards for the non-detection and false alarm probabilities. The 5 MWe Reactor was modeled for both plutonium production...

Rauch, Eric B.

2010-07-14T23:59:59.000Z

47

Guidelines for preparing criticality safety evaluations at Department of Energy non-reactor nuclear facilities  

SciTech Connect (OSTI)

This document contains guidelines that should be followed when preparing Criticality Safety Evaluations that will be used to demonstrate the safety of operations performed at DOE non-reactor nuclear facilities. Adherence to these guidelines will provide consistency and uniformity in criticality safety evaluations (CSEs) across the complex and will document compliance with the requirements of DOE Order 5480.24.

Not Available

1993-11-01T23:59:59.000Z

48

A Blueprint for GNEP Advanced Burner Reactor Startup Fuel Fabrication Facility  

SciTech Connect (OSTI)

The purpose of this article is to identify the requirements and issues associated with design of GNEP Advanced Burner Reactor Fuel Facility. The report was prepared in support of providing data for preparation of a NEPA Environmental Impact Statement in support the U. S. Department of Energy (DOE) Global Nuclear Energy Partnership (GNEP). One of the GNEP objectives was to reduce the inventory of long lived actinide from the light water reactor (LWR) spent fuel. The LWR spent fuel contains Plutonium (Pu) -239 and other transuranics (TRU) such as Americium-241. One of the options is to transmute or burn these actinides in fast neutron spectra as well as generate the electricity. A sodium-cooled Advanced Recycling Reactor (ARR) concept was proposed to achieve this goal. However, fuel with relatively high TRU content has not been used in the fast reactor. To demonstrate the utilization of TRU fuel in a fast reactor, an Advanced Burner Reactor (ABR) prototype of ARR was proposed, which would necessarily be started up using weapons grade (WG) Pu fuel. The WG Pu is distinguished by relatively highest proportions of Pu-239 and lesser amount of other actinides. The WG Pu was assumed to be used as the startup fuel along with TRU fuel in lead test assemblies. Because such fuel is not currently being produced in the US, a new facility (or new capability in an existing facility) was being considered for fabrication of WG Pu fuel for the ABR. It was estimated that the facility will provide the startup fuel for 10-15 years and would take 3 to 5 years to construct.

S. Khericha

2010-12-01T23:59:59.000Z

49

Utilization of the Philippine Research Reactor as a training facility for nuclear power plant operators  

SciTech Connect (OSTI)

The Philippines has a 1-MW swimming-pool reactor facility operated by the Philippine Atomic Energy Commission (PAEC). The reactor is light-water moderated and cooled, graphite reflected, and fueled with 90% enriched uranium. Since it became critical in 1963 it has been utilized for research, radioisotope production, and training. It was used initially in the training of PAEC personnel and other research institutions and universities. During the last few years, however, it has played a key role in training personnel for the Philippine Nuclear Power Project (PNPP).

Palabrica, R.J.

1981-01-01T23:59:59.000Z

50

Applicability of base-isolation R D in non-reactor facilities to a nuclear reactor plant  

SciTech Connect (OSTI)

Seismic isolation is gaining increased attention worldwide for use in a wide spectrum of critical facilities, ranging from hospitals and computing centers to nuclear power plants. While the fundamental principles and technology are applicable to all of these facilities, the degree of assurance that the actual behavior of the isolation systems is as specified varies with the nature of the facility involved. Obviously, the level of effort to provide such assurance for a nuclear power plant will be much greater than that required for, say, a critical computer facility. The question, therefore, is to what extent can research and development (R D) for non-nuclear use be used to provide technological data needed for seismic isolation of a nuclear power plant. This question, of course is not unique to seismic isolation. Virtually every structural component, system, or piece of equipment used in nuclear power plants is also used in non- nuclear facilities. Experience shows that considerable effort is needed to adapt conventional technology into a nuclear power plant. Usually, more thorough analysis is required, material and fabrication quality-control requirements are more stringent as are controls on field installation. In addition, increased emphasis on maintainability and inservice inspection throughout the life of the plant is generally required to gain acceptance in nuclear power plant application. This paper reviews the R D programs ongoing for seismic isolation in non-nuclear facilities and related experience and makes a preliminary assessment of the extent to which such R D and experience can be used for nuclear power plant application. Ways are suggested to improve the usefulness of such non-nuclear R D in providing the high level of confidence required for the use of seismic isolation in a nuclear reactor plant. 2 refs.

Seidensticker, R.W.; Chang, Y.W.

1990-01-01T23:59:59.000Z

51

EIS-0259: Disposal of Decommissioned, Defueled Cruiser, Ohio Class and Los Angeles Class Naval Reactor Plants, Hanford Site, Richland (adopted from Navy)  

Broader source: Energy.gov [DOE]

This EIS analyzes the alternate ways for disposing of decommissioned, defieled reactor compliments from U.S. Navy nuclear-powered cruisers, (Bainbridge, Truxtun, Long Beach, California Class and Virginia Class) and Los Angeles Class, and Ohio Class submarines.

52

Descriptions of selected accidents that have occurred at nuclear reactor facilities  

SciTech Connect (OSTI)

This report was prepared at the request of the President's Commission on the Accident at Three Mile Island to provide the members of the Commission with some insight into the nature and significance of accidents that have occurred at nuclear reactor facilities in the past. Toward that end, this report presents a brief description of 44 accidents which have occurred throughout the world and which meet at least one of the severity criteria that were established.

Bertini, H.W.

1980-04-01T23:59:59.000Z

53

An Experimental Test Facility to Support Development of the Fluoride Salt Cooled High Temperature Reactor  

SciTech Connect (OSTI)

The need for high-temperature (greater than 600 C) energy exchange and delivery systems is significantly increasing as the world strives to improve energy efficiency and develop alternatives to petroleum-based fuels. Liquid fluoride salts are one of the few energy transport fluids that have the capability of operating at high temperatures in combination with low system pressures. The Fluoride Salt-Cooled High-Temperature Reactor design uses fluoride salt to remove core heat and interface with a power conversion system. Although a significant amount of experimentation has been performed with these salts, specific aspects of this reactor concept will require experimental confirmation during the development process. The experimental facility described here has been constructed to support the development of the Fluoride Salt Cooled High Temperature Reactor concept. The facility is capable of operating at up to 700 C and incorporates a centrifugal pump to circulate FLiNaK salt through a removable test section. A unique inductive heating technique is used to apply heat to the test section, allowing heat transfer testing to be performed. An air-cooled heat exchanger removes added heat. Supporting loop infrastructure includes a pressure control system; trace heating system; and a complement of instrumentation to measure salt flow, temperatures, and pressures around the loop. The initial experiment is aimed at measuring fluoride salt heat transfer inside a heated pebble bed similar to that used for the core of the pebble bed advanced high-temperature reactor. This document describes the details of the loop design, auxiliary systems used to support the facility, the inductive heating system, and facility capabilities.

Yoder Jr, Graydon L [ORNL] [ORNL; Aaron, Adam M [ORNL] [ORNL; Cunningham, Richard Burns [University of Tennessee, Knoxville (UTK)] [University of Tennessee, Knoxville (UTK); Fugate, David L [ORNL] [ORNL; Holcomb, David Eugene [ORNL] [ORNL; Kisner, Roger A [ORNL] [ORNL; Peretz, Fred J [ORNL] [ORNL; Robb, Kevin R [ORNL] [ORNL; Wilgen, John B [ORNL] [ORNL; Wilson, Dane F [ORNL] [ORNL

2014-01-01T23:59:59.000Z

54

Guidelines for preparing criticality safety evaluations at Department of Energy non-reactor nuclear facilities  

SciTech Connect (OSTI)

This Department of Energy (DOE) is approved for use by all components of DOE. It contains guidelines that should be followed when preparing Criticality Safety Evaluations that will be used to demonstrate the safety of operations performed at DOE Non-Reactor Nuclear Facilities. Adherence with these guidelines will provide consistency and uniformity in Criticality Safety Evaluations (CSEs) across the complex and will document compliance with DOE Order 5480.24 requirements as they pertain to CSEs.

NONE

1998-09-01T23:59:59.000Z

55

EIS-0259 Final Environmental Impact Statement On The Disposal Of Decommissioned, Defueled Cruiser, Ohio Class, And Los Angeles Class Naval Reactor Plants  

Broader source: Energy.gov (indexed) [DOE]

-. -. 1. PURPOSE AND NEED U.S. Navy nuclear ships are decommissioned and defieled at the end of their usefi Metime, when the cost of continued operation is not justified by their fitary capabfity, or when the ship is no longer needed. The Navy needs to disposition the reactor compartments born defieled and decommissioned ctisers, and OHIO Class and LOS ANGELES Class submarines. The number of reactor compartments under consideration by this Environmental Impact Statement is about 100. These reactor compartments are in addition to the pre-LOS ANGELES Class submarines tieady being disposed of under the Na&s 1984 Find Environmental hpact Statement (USN, 1984a). Newer types of U.S. Navy nuclear-powered stips that are not expected to be decommissioned in the next 20 years (e.g., aircraft carriers, SEAWOLF Class submarines) are not included in this fid Enviromentd Impact Statement.

56

EIS-0259 Final Environmental Impact Statement On The Disposal Of Decommissioned, Defueled Cruiser, Ohio Class, And Los Angeles Class Naval Reactor Plants  

Broader source: Energy.gov (indexed) [DOE]

... -. FEASIBILITY STUDY FOR LEAD REMOVAL FROM AND STRUCTURAL RESTORATION OF CRUISER, OHIO, AND LOS ANGELES CLASS REACTOR COMPARTMENT DISPOSAL PACWGES Appendix A A-i . Table of Contents E~CUT~ S~Y . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..A.3 1. ~TRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .." . . . . . . . . . . . . . . . ..A.3 2. DESCR~TION OF S~ELD~G LEAD CONTmD ~ REACTOR commmm PAcmGEs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..A.4 2.1 PermanentSMeldingLead . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..A-4 2.2 MisceUaneousLead . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..A-5 2.3 Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ................"A-5 2.4 Assumptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .................A-5 3. SHIELD~G LEAD REMOVQ

57

Summary engineering description of underwater fuel storage facility for foreign research reactor spent nuclear fuel  

SciTech Connect (OSTI)

This document is a summary description for an Underwater Fuel Storage Facility (UFSF) for foreign research reactor (FRR) spent nuclear fuel (SNF). A FRR SNF environmental Impact Statement (EIS) is being prepared and will include both wet and dry storage facilities as storage alternatives. For the UFSF presented in this document, a specific site is not chosen. This facility can be sited at any one of the five locations under consideration in the EIS. These locations are the Idaho National Engineering Laboratory, Savannah River Site, Hanford, Oak Ridge National Laboratory, and Nevada Test Site. Generic facility environmental impacts and emissions are provided in this report. A baseline fuel element is defined in Section 2.2, and the results of a fission product analysis are presented. Requirements for a storage facility have been researched and are summarized in Section 3. Section 4 describes three facility options: (1) the Centralized-UFSF, which would store the entire fuel element quantity in a single facility at a single location, (2) the Regionalized Large-UFSF, which would store 75% of the fuel element quantity in some region of the country, and (3) the Regionalized Small-UFSF, which would store 25% of the fuel element quantity, with the possibility of a number of these facilities in various regions throughout the country. The operational philosophy is presented in Section 5, and Section 6 contains a description of the equipment. Section 7 defines the utilities required for the facility. Cost estimates are discussed in Section 8, and detailed cost estimates are included. Impacts to worker safety, public safety, and the environment are discussed in Section 9. Accidental releases are presented in Section 10. Standard Environmental Impact Forms are included in Section 11.

Dahlke, H.J.; Johnson, D.A.; Rawlins, J.K.; Searle, D.K.; Wachs, G.W.

1994-10-01T23:59:59.000Z

58

Advanced Test Reactor National Scientific User Facility: Addressing advanced nuclear materials research  

SciTech Connect (OSTI)

The Advanced Test Reactor National Scientific User Facility (ATR NSUF), based at the Idaho National Laboratory in the United States, is supporting Department of Energy and industry research efforts to ensure the properties of materials in light water reactors are well understood. The ATR NSUF is providing this support through three main efforts: establishing unique infrastructure necessary to conduct research on highly radioactive materials, conducting research in conjunction with industry partners on life extension relevant topics, and providing training courses to encourage more U.S. researchers to understand and address LWR materials issues. In 2010 and 2011, several advanced instruments with capability focused on resolving nuclear material performance issues through analysis on the micro (10-6 m) to atomic (10-10 m) scales were installed primarily at the Center for Advanced Energy Studies (CAES) in Idaho Falls, Idaho. These instruments included a local electrode atom probe (LEAP), a field-emission gun scanning transmission electron microscope (FEG-STEM), a focused ion beam (FIB) system, a Raman spectrometer, and an nanoindentor/atomic force microscope. Ongoing capability enhancements intended to support industry efforts include completion of two shielded, irradiation assisted stress corrosion cracking (IASCC) test loops, the first of which will come online in early calendar year 2013, a pressurized and controlled chemistry water loop for the ATR center flux trap, and a dedicated facility intended to house post irradiation examination equipment. In addition to capability enhancements at the main site in Idaho, the ATR NSUF also welcomed two new partner facilities in 2011 and two new partner facilities in 2012; the Oak Ridge National Laboratory, High Flux Isotope Reactor (HFIR) and associated hot cells and the University California Berkeley capabilities in irradiated materials analysis were added in 2011. In 2012, Purdue University’s Interaction of Materials with Particles and Components Testing (IMPACT) facility and the Pacific Northwest Nuclear Laboratory (PNNL) Radiochemistry Processing Laboratory (RPL) and PIE facilities were added. The ATR NSUF annually hosts a weeklong event called User’s Week in which students and faculty from universities as well as other interested parties from regulatory agencies or industry convene in Idaho Falls, Idaho to see presentations from ATR NSUF staff as well as select researchers from the materials research field. User’s week provides an overview of current materials research topics of interest and an opportunity for young researchers to understand the process of performing work through ATR NSUF. Additionally, to increase the number of researchers engaged in LWR materials issues, a series of workshops are in progress to introduce research staff to stress corrosion cracking, zirconium alloy degradation, and uranium dioxide degradation during in-reactor use.

John Jackson; Todd Allen; Frances Marshall; Jim Cole

2013-03-01T23:59:59.000Z

59

Reliability Engineering Approach to Probabilistic Proliferation Resistance Analysis of the Example Sodium Fast Reactor Fuel Cycle Facility  

E-Print Network [OSTI]

-cooled fast reactor and pyroprocessing facility were designed by Argonne National Laboratory (ANL) for the purpose of facilitating discussion on the subject of fast reactor and pyroprocessing safeguards in the absence of a safeguards confidential design... proliferators due to the presence of bulk nuclear material and the ability to acquire plutonium in a form easier to convert to a weapon. The ESFR design includes four 800 MWth (300 MWe) reactors (Argonne National Laboratory 2006) and an on...

Cronholm, Lillian Marie

2012-10-19T23:59:59.000Z

60

Decommissioning an Active Historical Reactor Facility at the Savannah River Site - 13453  

SciTech Connect (OSTI)

The Savannah River Site (SRS) is an 802 square-kilometer United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina, where Management and Operations are performed by Savannah River Nuclear Solutions (SRNS). In 2004, DOE recognized SRS as structure within the Cold War Historic District of national, state and local significance composed of the first generation of facilities constructed and operated from 1950 through 1989 to produce plutonium and tritium for our nation's defense. DOE agreed to manage the SRS 105-C Reactor Facility as a potentially historic property due to its significance in supporting the U.S. Cold War Mission and for potential for future interpretation. This reactor has five primary areas within it, including a Disassembly Basin (DB) that received irradiated materials from the reactor, cooled them and prepared the components for loading and transport to a Separation Canyon for processing. The 6,317 square meter area was divided into numerous work/storage areas. The walls between the individual basin compartments have narrow vertical openings called 'slots' that permit the transfer of material from one section to another. Data indicated there was over 830 curies of radioactivity associated with the basin sediments and approximately 9.1 M liters of contaminated water, not including a large quantity of activated reactor equipment, scrap metal, and debris on the basin floor. The need for an action was identified in 2010 to reduce risks to personnel in the facility and to eliminate the possible release of contaminants into the environment. The release of DB water could potentially migrate to the aquifer and contaminate groundwater. DOE, its regulators [U. S. Environmental Protection Agency (USEPA)-Region 4 and the South Carolina Department of Health and Environmental Control (SCDHEC)] and the SC Historical Preservation Office (SHPO) agreed/concurred to perform a non-time critical removal action for the In Situ Decommissioning (ISD) of the 105-C Disassembly Basin. ISD consisted of stabilization/isolation of remaining contaminated water, sediment, activated reactor equipment, and scrap metal by filling the DB with underwater non-structural grout to the appropriate (-4.877 meter) grade-level, thence with dry area non-structural grout to the final -10 centimeter level. The roof over the DB was preserved due to its potential historical significance and to prevent the infiltration of precipitation. Forced evaporation was the form of treatment implemented to remove the approximately 9.1 M liters of contaminated basin water. Using specially formulated grouts, irradiated materials and sediment were treated by solidification/isolation thus reducing their mobility, reducing radiation exposure and creating an engineered barrier thereby preventing access to the contaminants. Grouting provided a low permeability barrier to minimize any potential transport of contaminants to the aquifer. Efforts were made to preserve the historical significance of the Reactor in accordance with the National Historic Preservation Act. ISD provides a cost effective means to isolate and contain residual radioactivity from past nuclear operations allowing natural radioactive decay to reduce hazards to manageable levels. This method limits release of radiological contamination to the environment, minimizes radiation exposure to workers, prevents human/animal access to the hazardous substances, and allows for ongoing monitoring of the decommissioned facility. Field construction was initiated in August 2011; evaporator operations commenced January 2012 and ended July 2012 with over 9 M liters of water treated/removed. Over 8,525 cubic meters of grout were placed, completing in August 2012. The project completed with an excellent safety record, on schedule and under budget. (authors)

Bergren, Christopher L.; Long, J. Tony; Blankenship, John K. [Savannah River Nuclear Solutions, LLC, Bldg. 730-4B, Aiken, SC 29808 (United States)] [Savannah River Nuclear Solutions, LLC, Bldg. 730-4B, Aiken, SC 29808 (United States); Adams, Karen M. [United States Department of Energy, Bldg. 730-B, Aiken, SC 29808 (United States)] [United States Department of Energy, Bldg. 730-B, Aiken, SC 29808 (United States)

2013-07-01T23:59:59.000Z

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

Commercial Light Water Reactor -Tritium Extraction Facility Process Waste Assessment (Project S-6091)  

SciTech Connect (OSTI)

The Savannah River Site (SRS) has been tasked by the Department of Energy (DOE) to design and construct a Tritium Extraction Facility (TEF) to process irradiated tritium producing burnable absorber rods (TPBARs) from a Commercial Light Water Reactor (CLWR). The plan is for the CLWR-TEF to provide tritium to the SRS Replacement Tritium Facility (RTF) in Building 233-H in support of DOE requirements. The CLWR-TEF is being designed to provide 3 kg of new tritium per year, from TPBARS and other sources of tritium (Ref. 1-4).The CLWR TPBAR concept is being developed by Pacific Northwest National Laboratory (PNNL). The TPBAR assemblies will be irradiated in a Commercial Utility light water nuclear reactor and transported to the SRS for tritium extraction and processing at the CLWR-TEF. A Conceptual Design Report for the CLWR-TEF Project was issued in July 1997 (Ref. 4).The scope of this Process Waste Assessment (PWA) will be limited to CLWR-TEF processing of CLWR irradiated TPBARs. Although the CLWR- TEF will also be designed to extract APT tritium-containing materials, they will be excluded at this time to facilitate timely development of this PWA. As with any process, CLWR-TEF waste stream characteristics will depend on process feedstock and contaminant sources. If irradiated APT tritium-containing materials are to be processed in the CLWR-TEF, this PWA should be revised to reflect the introduction of this contaminant source term.

Hsu, R.H.; Delley, A.O.; Alexander, G.J.; Clark, E.A.; Holder, J.S.; Lutz, R.N.; Malstrom, R.A.; Nobles, B.R. [Westinghouse Savannah River Co., Aiken, SC (United States); Carson, S.D. [Sandia National Laboratories, New Mexico, NM (United States); Peterson, P.K. [Sandia National Laboratories, New Mexico, NM (United States)

1997-11-30T23:59:59.000Z

62

THE COMPONENT TEST FACILITY – A NATIONAL USER FACILITY FOR TESTING OF HIGH TEMPERATURE GAS-COOLED REACTOR (HTGR) COMPONENTS AND SYSTEMS  

SciTech Connect (OSTI)

The Next Generation Nuclear Plant (NGNP) and other High-Temperature Gas-cooled Reactor (HTGR) Projects require research, development, design, construction, and operation of a nuclear plant intended for both high-efficiency electricity production and high-temperature industrial applications, including hydrogen production. During the life cycle stages of an HTGR, plant systems, structures and components (SSCs) will be developed to support this reactor technology. To mitigate technical, schedule, and project risk associated with development of these SSCs, a large-scale test facility is required to support design verification and qualification prior to operational implementation. As a full-scale helium test facility, the Component Test facility (CTF) will provide prototype testing and qualification of heat transfer system components (e.g., Intermediate Heat Exchanger, valves, hot gas ducts), reactor internals, and hydrogen generation processing. It will perform confirmation tests for large-scale effects, validate component performance requirements, perform transient effects tests, and provide production demonstration of hydrogen and other high-temperature applications. Sponsored wholly or in part by the U.S. Department of Energy, the CTF will support NGNP and will also act as a National User Facility to support worldwide development of High-Temperature Gas-cooled Reactor technologies.

David S. Duncan; Vondell J. Balls; Stephanie L. Austad

2008-09-01T23:59:59.000Z

63

Coastal Inundation due to Tide, Surge, Waves, and Sea Level Rise at Naval Station Norfolk  

E-Print Network [OSTI]

Coastal Inundation due to Tide, Surge, Waves, and Sea Level Rise at Naval Station Norfolk Honghai of future sea level rise (SLR) scenarios and to evaluate the potential coastal inundation at Naval Station and sea level rise threats to coastal residents and coastal military facilities, the US Strategic

US Army Corps of Engineers

64

Investigation of the November 8, 2011, Plutonium Contamination in the Zero Power Physics Reactor Facility, at the Idaho National Laboratory  

Broader source: Energy.gov [DOE]

On November 8, 2011, workers at the Idaho National Laboratory (INL) Materials and Fuels Complex (MFC) Zero Power Physics Reactor (ZPPR) Facility were packaging plutonium (Pu) reactor fuel plates. Two of the fuel storage containers had atypical labels indicating potential abnormalities with the fuel plates located inside. Upon opening one of the storage containers, the workers discovered a Pu fuel plate wrapped in plastic and tape. When the workers attempted to remove the wrapping material, an uncontrolled release of radioactive contaminants occurred, resulting in the contamination of 16 workers and the facility

65

FY 2012 Budget Hearing Testimony on Nuclear Nonproliferation and Naval  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

on Nuclear Nonproliferation and Naval on Nuclear Nonproliferation and Naval Reactor Programs before the House Appropriations Committee, Energy and Water Development Subcommittee | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Congressional Testimony > FY 2012 Budget Hearing Testimony on Nuclear ...

66

FY 2012 Budget Hearing Testimony on Nuclear Nonproliferation and Naval  

National Nuclear Security Administration (NNSA)

on Nuclear Nonproliferation and Naval on Nuclear Nonproliferation and Naval Reactor Programs before the House Appropriations Committee, Energy and Water Development Subcommittee | National Nuclear Security Administration Our Mission Managing the Stockpile Preventing Proliferation Powering the Nuclear Navy Emergency Response Recapitalizing Our Infrastructure Continuing Management Reform Countering Nuclear Terrorism About Us Our Programs Our History Who We Are Our Leadership Our Locations Budget Our Operations Media Room Congressional Testimony Fact Sheets Newsletters Press Releases Speeches Events Social Media Video Gallery Photo Gallery NNSA Archive Federal Employment Apply for Our Jobs Our Jobs Working at NNSA Blog Home > Media Room > Congressional Testimony > FY 2012 Budget Hearing Testimony on Nuclear ...

67

Advanced Test Reactor Complex Facilities Radioactive Waste Management Basis and DOE Manual 435.1-1 Compliance Tables  

SciTech Connect (OSTI)

U.S. Department of Energy Order 435.1, 'Radioactive Waste Management,' along with its associated manual and guidance, requires development and maintenance of a radioactive waste management basis for each radioactive waste management facility, operation, and activity. This document presents a radioactive waste management basis for Idaho National Laboratory's Advanced Test Reactor Complex facilities that manage radioactive waste. The radioactive waste management basis for a facility comprises existing laboratory-wide and facility-specific documents. U.S. Department of Energy Manual 435.1-1, 'Radioactive Waste Management Manual,' facility compliance tables also are presented for the facilities. The tables serve as a tool to develop the radioactive waste management basis.

Lisa Harvego; Brion Bennett

2011-11-01T23:59:59.000Z

68

Accident safety analysis for 300 Area N Reactor Fuel Fabrication and Storage Facility  

SciTech Connect (OSTI)

The purpose of the accident safety analysis is to identify and analyze a range of credible events, their cause and consequences, and to provide technical justification for the conclusion that uranium billets, fuel assemblies, uranium scrap, and chips and fines drums can be safely stored in the 300 Area N Reactor Fuel Fabrication and Storage Facility, the contaminated equipment, High-Efficiency Air Particulate filters, ductwork, stacks, sewers and sumps can be cleaned (decontaminated) and/or removed, the new concretion process in the 304 Building will be able to operate, without undue risk to the public, employees, or the environment, and limited fuel handling and packaging associated with removal of stored uranium is acceptable.

Johnson, D.J.; Brehm, J.R.

1994-01-01T23:59:59.000Z

69

Production of 37Ar in The University of Texas TRIGA reactor facility  

SciTech Connect (OSTI)

The detection of {sup 37}Ar is important for on-site inspections for the Comprehensive Nuclear-Test-Ban Treaty monitoring. In an underground nuclear explosion this radionuclide is produced by {sup 40}Ca(n,{alpha}){sup 37}Ar reaction in surrounding soil and rock. With a half-life of 35 days, {sup 37}Ar provides a signal useful for confirming the location of an underground nuclear event. An ultra-low-background proportional counter developed by Pacific Northwest National Laboratory is used to detect {sup 37}Ar, which decays via electron capture. The irradiation of Ar gas at natural enrichment in the 3L facility within the Mark II TRIGA reactor facility at The University of Texas at Austin provides a source of {sup 37}Ar for the calibration of the detector. The {sup 41}Ar activity is measured by the gamma activity using an HPGe detector after the sample is removed from the core. Using the {sup 41}Ar/{sup 37}Ar production ratio and the {sup 41}Ar activity, the amount of {sup 37}Ar created is calculated. The {sup 41}Ar decays quickly (half-life of 109.34 minutes) leaving a radioactive sample of high purity {sup 37}Ar and only trace levels of {sup 39}Ar.

Egnatuk, Christine M.; Lowrey, Justin; Biegalski, S.; Bowyer, Ted W.; Haas, Derek A.; Orrell, John L.; Woods, Vincent T.; Keillor, Martin E.

2011-06-19T23:59:59.000Z

70

Fracture of aluminum naval structures  

E-Print Network [OSTI]

Structural catastrophic failure of naval vessels due to extreme loads such as underwater or air explosion, high velocity impact (torpedoes), or hydrodynamic loads (high speed vessels) is primarily caused by fracture. ...

Galanis, Konstantinos, 1970-

2007-01-01T23:59:59.000Z

71

INDEPENDENT CONFIRMATORY SURVEY REPORT FOR THE REACTOR BUILDING, HOT LABORATORY, PRIMARY PUMP HOUSE, AND LAND AREAS AT THE PLUM BROOK REACTOR FACILITY, SANDUSKY, OHIO  

SciTech Connect (OSTI)

In 1941, the War Department acquired approximately 9,000 acres of land near Sandusky, Ohio and constructed a munitions plant. The Plum Brook Ordnance Works Plant produced munitions, such as TNT, until the end of World War II. Following the war, the land remained idle until the National Advisory Committee for Aeronautics later called the National Aeronautics and Space Administration (NASA) obtained 500 acres to construct a nuclear research reactor designed to study the effects of radiation on materials used in space flight. The research reactor was put into operation in 1961 and was the first of fifteen test facilities eventually built by NASA at the Plum Brook Station. By 1963, NASA had acquired the remaining land at Plum Brook for these additional test facilities

Erika N. Bailey

2011-10-10T23:59:59.000Z

72

REPORT NT-14-3  

National Nuclear Security Administration (NNSA)

3 MAY 2014 OCCUPATIONAL RADIATION EXPOSURE FROM NAVAL REACTORS' DEPARTMENT OF ENERGY FACILITIES NAVAL NUCLEAR PROPULSION PROGRAM OFFICE OF NAVAL REACTORS WASHINGTON, D.C. 20585...

73

Naval Spent Fuel Rail Shipment Accident Exercise Objectives ...  

Office of Environmental Management (EM)

Naval Spent Fuel Rail Shipment Accident Exercise Objectives Naval Spent Fuel Rail Shipment Accident Exercise Objectives Naval Spent Fuel Rail Shipment Accident Exercise Objectives...

74

DATE  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The...

75

Assessment of radioactive wastes from a DCLL fusion reactor: Disposal in El Cabril facility  

Science Journals Connector (OSTI)

Abstract Under the Spanish Breeding Blanket Technology Programme TECNO_FUS a conceptual design of a DCLL (Dual-Coolant Lithium–Lead) blanket-based reactor is being revised. The dually cooled breeding zone is composed of He/LiPb and SiC as material of the liquid metal flow channel inserts. Structural materials are ferritic-martensitic steel (Eurofer) for the blanket and austenitic steel (SS316LN) for the vacuum vessel (VV) and the cryostat. In this work, radioactive wastes are assessed in order to determine if they can be disposed as low and intermediate level radioactive waste (LILW) in the Spanish near surface disposal facility of El Cabril. Also, unconditional clearance and recycling waste management options are studied. The neutron transport calculations have been performed with MCNPX code, while the ACAB code is used for calculations of the inventory of activation products and for activation analysis, in terms of waste management ratings for the options considered. Results show that the total amount of the cryostat can be disposed in El Cabril joined to the outer layer of both VV and channel inserts, whereas only concrete-made biological shield can be managed through clearance and none of the steels can be recycled. Those results are compared with those corresponding to French regulation, showing similar conclusions.

Raquel García; Juan Pablo Catalán; Javier Sanz

2014-01-01T23:59:59.000Z

76

Nuclear-fuel-cycle risk assessment: descriptions of representative non-reactor facilities. Sections 1-14  

SciTech Connect (OSTI)

The Fuel Cycle Risk Assessment Program was initiated to provide risk assessment methods for assistance in the regulatory process for nuclear fuel cycle facilities other than reactors. This report, the first from the program, defines and describes fuel cycle elements that are being considered in the program. One type of facility (and in some cases two) is described that is representative of each element of the fuel cycle. The descriptions are based on real industrial-scale facilities that are current state-of-the-art, or on conceptual facilities where none now exist. Each representative fuel cycle facility is assumed to be located on the appropriate one of four hypothetical but representative sites described. The fuel cycles considered are for Light Water Reactors with once-through flow of spent fuel, and with plutonium and uranium recycle. Representative facilities for the following fuel cycle elements are described for uranium (or uranium plus plutonium where appropriate): mining, milling, conversion, enrichment, fuel fabrication, mixed-oxide fuel refabrication, fuel reprocessing, spent fuel storage, high-level waste storage, transuranic waste storage, spent fuel and high-level and transuranic waste disposal, low-level and intermediate-level waste disposal, and transportation. For each representative facility the description includes: mainline process, effluent processing and waste management, facility and hardware description, safety-related information and potential alternative concepts for that fuel cycle element. The emphasis of the descriptive material is on safety-related information. This includes: operating and maintenance requirements, input/output of major materials, identification and inventories of hazardous materials (particularly radioactive materials), unit operations involved, potential accident driving forces, containment and shielding, and degree of hands-on operation.

Schneider, K.J.

1982-09-01T23:59:59.000Z

77

Plutonium Consumption Program, CANDU Reactor Project: Feasibility of BNFP Site as MOX Fuel Supply Facility. Final report  

SciTech Connect (OSTI)

An evaluation was made of the technical feasibility, cost, and schedule for converting the existing unused Barnwell Nuclear Fuel Facility (BNFP) into a Mixed Oxide (MOX) CANDU fuel fabrication plant for disposition of excess weapons plutonium. This MOX fuel would be transported to Ontario where it would generate electricity in the Bruce CANDU reactors. Because CANDU MOX fuel operates at lower thermal load than natural uranium fuel, the MOX program can be licensed by AECB within 4.5 years, and actual Pu disposition in the Bruce reactors can begin in 2001. Ontario Hydro will have to be involved in the entire program. Cost is compared between BNFP and FMEF at Hanford for converting to a CANDU MOX facility.

NONE

1995-06-30T23:59:59.000Z

78

Naval Petroleum Reserves | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Naval Petroleum Reserves For much of the 20th century, the Naval Petroleum and Oil Shale Reserves served as a contingency source of fuel for the Nation's military. All that...

79

The Institution of Naval Architects  

Science Journals Connector (OSTI)

... THE annual spring meeting of the Institution of Naval Architects was held on Wednesday, Thursday, and Friday ... U.S. Navy."On the Method of initial Condensation and Heat Waste in Steam Engine Cylinders,"by Prof. R. H. Thurston, Sibley College, Cornell University, New ...

1895-04-11T23:59:59.000Z

80

The Institution of Naval Architects  

Science Journals Connector (OSTI)

... LAST week the Institution of Naval Architects held their annual spring meeting, under the chairmanship of Admiral Sir John Dalrymple Hay, one of the Vice ... Chief Surveyor Lloyd's Registry of Shipping; (13) "Steam pressure losses in marine engines,"by C. E. Stromeyer, Engineer Surveyor Lloyd's Registry of Shipping; (15 ...

1894-03-22T23:59:59.000Z

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

The Institution of Naval Architects  

Science Journals Connector (OSTI)

... THE annual spring meeting of the Institution of Naval Architects was held last week at the Society of ... elements of design of three imaginary battleships, propelled respectively by steam, gas, or oil engines. It is somewhat startling to find the chief engineer of one of our most ...

1907-03-28T23:59:59.000Z

82

E-Print Network 3.0 - afrri-triga reactor facility Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

emit to the environment significant quantities of heat, contributing... to the greenhouse effect. New Generation reactors to achieve the reuse of spent fuel. Fusion...

83

Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1, Appendix D, Part B: Naval spent nuclear fuel management  

SciTech Connect (OSTI)

This volume contains the following attachments: transportation of Naval spent nuclear fuel; description of Naval spent nuclear receipt and handling at the Expended Core Facility at the Idaho National Engineering Laboratory; comparison of storage in new water pools versus dry container storage; description of storage of Naval spent nuclear fuel at servicing locations; description of receipt, handling, and examination of Naval spent nuclear fuel at alternate DOE facilities; analysis of normal operations and accident conditions; and comparison of the Naval spent nuclear fuel storage environmental assessment and this environmental impact statement.

Not Available

1994-06-01T23:59:59.000Z

84

Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities Facilities Facilities LANL's mission is to develop and apply science and technology to ensure the safety, security, and reliability of the U.S. nuclear deterrent; reduce global threats; and solve other emerging national security and energy challenges. Contact Operator Los Alamos National Laboratory (505) 667-5061 Some LANL facilities are available to researchers at other laboratories, universities, and industry. Unique facilities foster experimental science, support LANL's security mission DARHT accelerator DARHT's electron accelerators use large, circular aluminum structures to create magnetic fields that focus and steer a stream of electrons down the length of the accelerator. Tremendous electrical energy is added along the way. When the stream of high-speed electrons exits the accelerator it is

85

Report of the ANS Project Feasibility Workshop for a High Flux Isotope Reactor-Center for Neutron Research Facility  

SciTech Connect (OSTI)

The Advanced Neutron Source (ANS) Conceptual Design Report (CDR) and its subsequent updates provided definitive design, cost, and schedule estimates for the entire ANS Project. A recent update to this estimate of the total project cost for this facility was $2.9 billion, as specified in the FY 1996 Congressional data sheet, reflecting a line-item start in FY 1995. In December 1994, ANS management decided to prepare a significantly lower-cost option for a research facility based on ANS which could be considered during FY 1997 budget deliberations if DOE or Congressional planners wished. A cost reduction for ANS of about $1 billion was desired for this new option. It was decided that such a cost reduction could be achieved only by a significant reduction in the ANS research scope and by maximum, cost-effective use of existing High Flux Isotope Reactor (HFIR) and ORNL facilities to minimize the need for new buildings. However, two central missions of the ANS -- neutron scattering research and isotope production-were to be retained. The title selected for this new option was High Flux Isotope Reactor-Center for Neutron Research (HFIR-CNR) because of the project`s maximum use of existing HFIR facilities and retention of selected, central ANS missions. Assuming this shared-facility requirement would necessitate construction work near HFIR, it was specified that HFIR-CNR construction should not disrupt normal operation of HFIR. Additional objectives of the study were that it be highly credible and that any material that might be needed for US Department of Energy (DOE) and Congressional deliberations be produced quickly using minimum project resources. This requirement made it necessary to rely heavily on the ANS design, cost, and schedule baselines. A workshop methodology was selected because assessment of each cost and/or scope-reduction idea required nearly continuous communication among project personnel to ensure that all ramifications of propsed changes.

Peretz, F.J.; Booth, R.S. [comp.

1995-07-01T23:59:59.000Z

86

CHARACTERIZATION OF A PRECIPITATE REACTOR FEED TANK (PRFT) SAMPLE FROM THE DEFENSE WASTE PROCESSING FACILITY (DWPF)  

SciTech Connect (OSTI)

A sample of from the Defense Waste Processing Facility (DWPF) Precipitate Reactor Feed Tank (PRFT) was pulled and sent to the Savannah River National Laboratory (SRNL) in June of 2013. The PRFT in DWPF receives Actinide Removal Process (ARP)/ Monosodium Titanate (MST) material from the 512-S Facility via the 511-S Facility. This 2.2 L sample was to be used in small-scale DWPF chemical process cell testing in the Shielded Cells Facility of SRNL. A 1L sub-sample portion was characterized to determine the physical properties such as weight percent solids, density, particle size distribution and crystalline phase identification. Further chemical analysis of the PRFT filtrate and dissolved slurry included metals and anions as well as carbon and base analysis. This technical report describes the characterization and analysis of the PRFT sample from DWPF. At SRNL, the 2.2 L PRFT sample was composited from eleven separate samples received from DWPF. The visible solids were observed to be relatively quick settling which allowed for the rinsing of the original shipping vials with PRFT supernate on the same day as compositing. Most analyses were performed in triplicate except for particle size distribution (PSD), X-ray diffraction (XRD), Scanning Electron Microscopy (SEM) and thermogravimetric analysis (TGA). PRFT slurry samples were dissolved using a mixed HNO3/HF acid for subsequent Inductively Coupled Plasma Atomic Emission Spectroscopy (ICPAES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS) analyses performed by SRNL Analytical Development (AD). Per the task request for this work, analysis of the PRFT slurry and filtrate for metals, anions, carbon and base were primarily performed to support the planned chemical process cell testing and to provide additional component concentrations in addition to the limited data available from DWPF. Analysis of the insoluble solids portion of the PRFT slurry was aimed at detailed characterization of these solids (TGA, PSD, XRD and SEM) in support of the Salt IPT chemistry team. The overall conclusions from analyses performed in this study are that the PRFT slurry consists of 0.61 Wt.% insoluble MST solids suspended in a 0.77 M [Na+] caustic solution containing various anions such as nitrate, nitrite, sulfate, carbonate and oxalate. The corresponding measured sulfur level in the PRFT slurry, a critical element for determining how much of the PRFT slurry gets blended into the SRAT, is 0.437 Wt.% TS. The PRFT slurry does not contain insoluble oxalates nor significant quantities of high activity sludge solids. The lack of sludge solids has been alluded to by the Salt IPT chemistry team in citing that the mixing pump has been removed from Tank 49H, the feed tank to ARP-MCU, thus allowing the sludge solids to settle out. ? The PRFT aqueous slurry from DWPF was found to contain 5.96 Wt.% total dried solids. Of these total dried solids, relatively low levels of insoluble solids (0.61 Wt.%) were measured. The densities of both the filtrate and slurry were 1.05 g/mL. ? Particle size distribution of the PRFT solids in filtered caustic simulant and XRD analysis of washed/dried PRFT solids indicate that the PRFT slurry contains a bimodal distribution of particles in the range of 1 and 6 ?m and that the particles contain sodium titanium oxide hydroxide Na2Ti2O4(OH)2 crystalline material as determined by XRD. These data are in excellent agreement with similar data obtained from laboratory sampling of vendor supplied MST. Scanning Electron Microscopy (SEM) combined with Energy Dispersive X-ray Spectroscopy (EDS) analysis of washed/dried PRFT solids shows the particles to be like previous MST analyses consisting of irregular shaped micron-sized solids consisting primarily of Na and Ti. ? Thermogravimetric analysis of the washed and unwashed PRFT solids shows that the washed solids are very similar to MST solids. The TGA mass loss signal for the unwashed solids shows similar features to TGA performed on cellulose nitrate filter paper indicating significant presence of the deteriorated filter

Crawford, C.; Bannochie, C.

2014-05-12T23:59:59.000Z

87

The development and demonstration of a thermal neutron radiography facility utilizing the TAMU NSC TRIGA reactor  

E-Print Network [OSTI]

of the beam port door and exposing detector at low reactor power. In order to permit operation 26 continously with minimal disruption of normal reactor operations and minimal radiation exposure to operating personnel, an object- detector holding apparatus... exposure except from the gamma rays in the beam. Righ quality radiographs were 29 obtained using Type R film with exposures of 20-30 minutes at a reactor power of 1 MW. Type M2/RP and Type AA films were used when speed was desired. Type AA...

Lorenz, Robert Wayne

2012-06-07T23:59:59.000Z

88

Verification Survey of the Building 315 Zero Power Reactor-6 Facility, Argonne National Laboratory-East, Argonne, Illinois  

SciTech Connect (OSTI)

Oak Ridge Institute for Science and Education (ORISE) conducted independent verification radiological survey activities at Argonne National Laboratory’s Building 315, Zero Power Reactor-6 facility in Argonne, Illinois. Independent verification survey activities included document and data reviews, alpha plus beta and gamma surface scans, alpha and beta surface activity measurements, and instrumentation comparisons. An interim letter report and a draft report, documenting the verification survey findings, were submitted to the DOE on November 8, 2006 and February 22, 2007, respectively (ORISE 2006b and 2007).

W. C. Adams

2007-05-25T23:59:59.000Z

89

EA-1236: Preparation for Transfer of Ownership of Naval Petroleum Reserve  

Broader source: Energy.gov (indexed) [DOE]

236: Preparation for Transfer of Ownership of Naval Petroleum 236: Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3, Natrona County, WY EA-1236: Preparation for Transfer of Ownership of Naval Petroleum Reserve No. 3, Natrona County, WY SUMMARY This EA evaluates activities that DOE would conduct in anticipation of possible transfer of Naval Petroleum Reserve No. 3 (NPR-3) out of Federal operation. Proposed activities would include accelerated plugging and abandoning of uneconomic wells, complete reclamation and restoration of abandoned sites including dismantling surface facilities, batteries, roads, test satellites, electrical distribution systems and associated power poles, when they are no longer needed for production, and the development of the Rocky Mountain Oilfield Testing Center (RMOTC).

90

DOE - Office of Legacy Management -- Naval Research Laboratory - DC 02  

Office of Legacy Management (LM)

Research Laboratory - DC 02 Research Laboratory - DC 02 FUSRAP Considered Sites Site: NAVAL RESEARCH LABORATORY (DC.02 ) Eliminated from consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Washington , D.C. DC.02-4 Evaluation Year: 1987 DC.02-4 Site Operations: Research and development on thermal diffusion. DC.02-4 Site Disposition: Eliminated - No Authority - AEC licensed - Military facility DC.02-4 DC.02-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Thorium DC.02-2 DC.02-3 Radiological Survey(s): None Indicated Site Status: Eliminated from consideration under FUSRAP - Referred to DOD DC.02-4 Also see Documents Related to NAVAL RESEARCH LABORATORY DC.02-1 - AEC Memorandum and Source Material License No. C-3393;

91

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2 reactor defueling and disassembly. Summary status report. Volume 3  

SciTech Connect (OSTI)

This document summarizes information relating to the preparations for defueling the Three Mile Island Unit 2 (TMI-2) reactor and disassembly activities being performed concurrently with decontamination of the facility. Data have been collected from activity reports, reactor containment entry records, and other sources and entered in a computerized data sysem which permits extraction/manipulation of specific data which can be used in planning for recovery from a loss of coolant event similar to that experienced at TMI-2 on March 28, 1979. This report contains summaries of man-hours, manpower, and radiation exposures incurred during the period of April 23, 1979 to April 16, 1985, in the completion of activities related to preparation for reactor defueling. Support activities conducted outside of radiation areas are not included within the scope of this report. Computerized reports included in this document are: A chronological summary listing work performed for the period; and summary reports for each major task undertaken in connection with the specific scope of this report. Presented in chronological order for the referenced time period. Manually-assembled table summaries are included for: Labor and exposures by department; and labor and exposures by major activity.

Doerge, D.H.; Miller, R.L.; Scotti, K.S.

1986-05-01T23:59:59.000Z

92

Demand response at the Naval Postgraduate School .  

E-Print Network [OSTI]

??The purpose of this MBA project is to assist the Naval Postgraduate School's Public Works department to assimilate into a Demand Response program that will… (more)

Stouffer, Dean

2008-01-01T23:59:59.000Z

93

Design of central irradiation facilities for the MITR-II research reactor  

E-Print Network [OSTI]

Design analysis studies have been made for various in-core irradiation facility designs which are presently used, or proposed for future use in the MITR-II. The information obtained includes reactivity effects, core flux ...

Meagher, Paul Christopher

1976-01-01T23:59:59.000Z

94

U.S. Naval war College Application | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

College Application U.S. Naval war College Application U.S. Naval War College Civilian Student Application. Naval War College Application More Documents & Publications DOE F 471.1...

95

Fresh and Spent Nuclear Fuel Repatriation from the IRT-2000 Research Reactor Facility, Sofia, Bulgaria  

SciTech Connect (OSTI)

The IRT 2000 research reactor, operated by the Bulgarian Institute for Nuclear Research and Nuclear Energy (INRNE), safely shipped all of their Russian-origin nuclear fuel from the Republic of Bulgaria to the Russian Federation beginning in 2003 and completing in 2008. These fresh and spent fuel shipments removed all highly enriched uranium (HEU) from Bulgaria. The fresh fuel was shipped by air in December 2003 using trucks and a commercial cargo aircraft. One combined spent fuel shipment of HEU and low enriched uranium (LEU) was completed in July 2008 using high capacity VPVR/M casks transported by truck, barge, and rail. The HEU shipments were assisted by the Russian Research Reactor Fuel Return Program (RRRFR) and the LEU spent fuel shipment was funded by Bulgaria. This report describes the work, approvals, organizations, equipment, and agreements required to complete these shipments and concludes with several major lessons learned.

K. J. Allen; T. G. Apostolov; I. S. Dimitrov

2009-03-01T23:59:59.000Z

96

2013 Federal Energy and Water Management Award Winner Naval Sea...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Naval Sea Systems Command 2013 Federal Energy and Water Management Award Winner Naval Sea Systems Command fewm13nswcphiladelphiahighres.pdf fewm13nswcphiladelphia.pdf More...

97

United States Naval Surface Warfare Center | Open Energy Information  

Open Energy Info (EERE)

Naval Surface Warfare Center Naval Surface Warfare Center Jump to: navigation, search Hydro | Hydrodynamic Testing Facilities Name United States Naval Surface Warfare Center Address Carderock, 9500 MacArthur Boulevard West Place Bethesda, Maryland Zip 20817 Sector Hydro Phone number (301) 227-1574 Website http://www.dt.navy.mil/hyd/fac Coordinates 38.9782231°, -77.1973878° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":38.9782231,"lon":-77.1973878,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

98

Theoretical analysis of the subcritical experiments performed in the IPEN/MB-01 research reactor facility  

SciTech Connect (OSTI)

The theoretical analysis of the subcritical experiments performed at the IPEN/MB-01 reactor employing the coupled NJOY/AMPX-II/TORT systems was successfully accomplished. All the analysis was performed employing ENDF/B-VII.0. The theoretical approach follows all the steps of the subcritical model of Gandini and Salvatores. The theory/experiment comparison reveals that the calculated subcritical reactivity is in a very good agreement to the experimental values. The subcritical index ({xi}) shows some discrepancies although in this particular case some work still have to be made to model in a better way the neutron source present in the experiments. (authors)

Lee, S. M.; Dos Santos, A. [Inst. de Pesquisas Energeticas e Nucleares, Cidade Universitaria, Av. Lineu Prestes, 2242, 05508-000 Sao Paulo - SP (Brazil)

2012-07-01T23:59:59.000Z

99

Calculation of damage function of Al2O3 in irradiation facilities for fusion reactor applications  

Science Journals Connector (OSTI)

A rigorous material testing program is essential for the development of the nuclear fusion world program. In particular, it is very important to predict the generation of the displacement damage in materials, because the irradiation intensity expected in fusion conditions is such that the performance of materials and components under these extreme conditions is unknown. To study the damage produced by neutrons in materials of interest for fusion, a specific computational methodology was developed. Neutron fluxes expected in different irradiation facilities (International Fusion Materials Irradiation Facility [IFMIF] and DEMO-HCLL) and in different irradiation spots were obtained with particles transport codes (McDeLicious, MCNP). The energy differential cross sections of primary knock-on atoms were calculated using the NJOY code. Resulting data were input into the Monte Carlo code MARLOWE to calculate the corresponding displacements (i.e., interstitials (I) and vacancies (V)). However, the number of Frenkel pairs created during irradiation strongly depends on the recombination radius between interstitials and vacancies. This parameter corresponds to the minimum distance below which instantaneous recombination occurs. Mainly, the influence of such parameter on the damage function in Al2O3 was assessed in this report. The displacements per atom values calculated as a function of the recombination radius considered are compared to experimental data to determine the most appropriate capture radius. In addition, the damage function and damage dose generated at different experimental irradiation facilities are compared with those expected in DEMO. The conclusion is that both IFMIF and TechnoFusión (future triple beam ion accelerator to emulate fusion neutron irradiation effects in materials) facilities are suited to perform relevant irradiation experiments for the design of DEMO.

F. Mota; C.J. Ortiz; R. Vila; N. Casal; A. García; A. Ibarra

2013-01-01T23:59:59.000Z

100

Fuel cycle facility control system for the Integral Fast Reactor Program  

SciTech Connect (OSTI)

As part of the Integral Fast Reactor (IFR) Fuel Demonstration, a new distributed control system designed, implemented and installed. The Fuel processes are a combination of chemical and machining processes operated remotely. To meet this special requirement, the new control system provides complete sequential logic control motion and positioning control and continuous PID loop control. Also, a centralized computer system provides near-real time nuclear material tracking, product quality control data archiving and a centralized reporting function. The control system was configured to use programmable logic controllers, small logic controllers, personal computers with touch screens, engineering work stations and interconnecting networks. By following a structured software development method the operator interface was standardized. The system has been installed and is presently being tested for operations.

Benedict, R.W.; Tate, D.A.

1993-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Occupational Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2008  

SciTech Connect (OSTI)

This report summarizes the occupational exposure data that are maintained in the U.S. Nuclear Regulatory Commission (NRC) Radiation Exposure Information and Reporting System (REIRS). The bulk of the information contained in the report was compiled from the 2008 annual reports submitted by five of the seven categories1 of NRC licensees subject to the reporting requirements of 10 CFR 20.2206. The annual reports submitted by these licensees consist of radiation exposure records for each monitored individual. These records are analyzed for trends and presented in this report in terms of collective dose and the distribution of dose among the monitored individuals. Because there are no geologic repositories for high-level waste currently licensed and no low-level waste disposal facilities in operation, only five categories will be considered in this report.

U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research

2009-12-01T23:59:59.000Z

102

Comparative naval architecture analysis of diesel submarines  

E-Print Network [OSTI]

Many comparative naval architecture analyses of surface ships have been performed, but few published comparative analyses of submarines exist. Of the several design concept papers, reports and studies that have been written ...

Torkelson, Kai Oscar

2005-01-01T23:59:59.000Z

103

DOE - Office of Legacy Management -- Naval Ordnance Test Station - CA 06  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Ordnance Test Station - CA 06 Ordnance Test Station - CA 06 FUSRAP Considered Sites Site: NAVAL ORDNANCE TEST STATION (CA.06) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: China Lake Naval Weapons Center Salt Wells Pilot Plant CA.06-1 Location: Inyokern , California CA.06-1 Evaluation Year: 1987 CA.06-1 Site Operations: Naval facility; experimental development work on shape charges and quality castings on a pilot plant scale. CA.06-1 Site Disposition: Eliminated - No indication that radioactive materials were handled at the site CA.06-1 Radioactive Materials Handled: None Indicated CA.06-1 Primary Radioactive Materials Handled: None CA.06-1 Radiological Survey(s): No Site Status: Eliminated from consideration under FUSRAP Also see

104

EIS-0290-SA-02: Supplement Analysis | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

2: Supplement Analysis EIS-0290-SA-02: Supplement Analysis Naval Reactors Facility Sludge Pan Container Disposition Project DOEEIS-0290-SA-02: Supplement Analysis Naval Reactors...

105

Personnel Support Facility (PSF)  

High Performance Buildings Database

Virginia Beach, VA The Personnel Support Facility (PSF) provides space for a library, the Navy Marine Corps Relief Society, the Substance Abuse Rehabilitation Program, St. Leo College, and the Navy College Program. A design-build project of brick, masonry, and steel, PSF is part of a post-occupancy evaluation study run by Naval Facilities Engineering Command. The study is being used to determine the benefits of green design.

106

The Naval Petroleum and Oil Shale Reserves | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

The Naval Petroleum and Oil Shale Reserves The Naval Petroleum and Oil Shale Reserves To ensure sufficient fuel for the fleet, the Government began withdrawing probable oil-bearing...

107

Fuel Cell Power Plant Experience Naval Applications | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Plant Experience Naval Applications Fuel Cell Power Plant Experience Naval Applications Presented at the DOE-DOD Shipboard APU Workshop on March 29, 2011. apu20118wolak.pdf More...

108

Title 10, Chapter 641 Pertaining to Naval Petroleum Reserves in U.S.C. |  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Title 10, Chapter 641 Pertaining to Naval Petroleum Reserves in Title 10, Chapter 641 Pertaining to Naval Petroleum Reserves in U.S.C. Title 10, Chapter 641 Pertaining to Naval Petroleum Reserves in U.S.C. CITE: 10USC7420 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7421 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7422 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7423 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7424 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7425 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7427 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7428 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7429 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7430 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7431 CHAPTER 641--NAVAL PETROLEUM RESERVES CITE: 10USC7432 CHAPTER 641--NAVAL PETROLEUM RESERVES

109

Naval Academy: Lockstep Program Is Abandoned  

Science Journals Connector (OSTI)

...and the building of safe water systems and sewers...Academy adopted two fundamental changes of policy...were descriptions of boilers, pumps, and guns included...Instruction in the operation of specific naval radar...such details of the operation as aquanaut experiences...

Luther J. Carter

1965-11-19T23:59:59.000Z

110

Yangtze Patrol: American Naval Forces in China  

E-Print Network [OSTI]

Yangtze Patrol: American Naval Forces in China A Selected, Partially-Annotated Bibliography literature of the United States Navy in China. mvh #12;"Like Chimneys in Summer" The thousands of men who served on the China Station before World War II have been all but forgotten, except in the mythology

111

Safety analysis report for the National Low-Temperature Neutron Irradiation Facility (NLTNIF) at the ORNL Bulk Shielding Reactor (BSR)  

SciTech Connect (OSTI)

This report provides information concerning: the experiment facility; experiment assembly; instrumentation and controls; materials; radioactivity; shielding; thermodynamics; estimated or measured reactivity effects; procedures; hazards; and quality assurance. (JDB)

Coltman, R.R. Jr.; Kerchner, H.R.; Klabunde, C.E.; Richardson, S.A.

1986-06-01T23:59:59.000Z

112

Fuel Cell Power Plant Experience Naval Applications  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

clean clean Fuel Cell Power Plant Experience Naval Applications US Department of Energy/ Office of Naval Research Shipboard Fuel Cell Workshop Washington, DC March 29, 2011 FuelCell Energy, the FuelCell Energy logo, Direct FuelCell and "DFC" are all registered trademarks (®) of FuelCell Energy, Inc. *FuelCell Energy, Inc. *Renewable and Liquid Fuels Experience *HTPEM Fuel Cell Stack for Shipboard APU *Solid Oxide Experience and Applications DOE-ONR Workshop FuelCell Energy, the FuelCell Energy logo, Direct FuelCell and "DFC" are all registered trademarks (®) of FuelCell Energy, Inc. FuelCell Energy, Inc. * Premier developer of fuel cell technology - founded in 1969 * Over 50 power installations in North America, Europe, and Asia * Industrial, commercial, utility

113

CX-008819: Categorical Exclusion Determination  

Broader source: Energy.gov [DOE]

Naval Reactors Facility Parking Lot Expansion General Plant Project CX(s) Applied: B1.15 Date: 06/20/2012 Location(s): Idaho Offices(s): Naval Nuclear Propulsion Program, Naval Reactors

114

Hazard Classification of the Remote Handled Low-Level Waste Disposal Facility  

SciTech Connect (OSTI)

The Battelle Energy Alliance (BEA) at the Idaho National Laboratory (INL) is constructing a new facility to replace remote-handled low-level radioactive waste disposal capability for INL and Naval Reactors Facility operations. Current disposal capability at the Radioactive Waste Management Complex (RWMC) will continue until the facility is full or closed for remediation (estimated at approximately fiscal year 2015). Development of a new onsite disposal facility is the highest ranked alternative and will provide RH-LLW disposal capability and will ensure continuity of operations that generate RH-LLW for the foreseeable future. As a part of establishing a safety basis for facility operations, the facility will be categorized according to DOE-STD-1027-92. This classification is important in determining the scope of analyses performed in the safety basis and will also dictate operational requirements of the completed facility. This paper discusses the issues affecting hazard classification in this nuclear facility and impacts of the final hazard categorization.

Boyd D. Christensen

2012-05-01T23:59:59.000Z

115

Experimental investigations on decay heat removal in advanced nuclear reactors using single heater rod test facility: Air alone in the annular gap  

SciTech Connect (OSTI)

During a loss of coolant accident in nuclear reactors, radiation heat transfer accounts for a significant amount of the total heat transfer in the fuel bundle. In case of heavy water moderator nuclear reactors, the decay heat of a fuel bundle enclosed in the pressure tube and outer concentric calandria tube can be transferred to the moderator. Radiation heat transfer plays a significant role in removal of decay heat from the fuel rods to the moderator, which is available outside the calandria tube. A single heater rod test facility is designed and fabricated as a part of preliminary investigations. The objective is to anticipate the capability of moderator to remove decay heat, from the reactor core, generated after shut down. The present paper focuses mainly on the role of moderator in removal of decay heat, for situation with air alone in the annular gap of pressure tube and calandria tube. It is seen that the naturally aspirated air is capable of removing the heat generated in the system compared to the standstill air or stagnant water situations. It is also seen that the flowing moderator is capable of removing a greater fraction of heat generated by the heater rod compared to a stagnant pool of boiling moderator. (author)

Bopche, Santosh B.; Sridharan, Arunkumar [Department of Mechanical Engineering, Indian Institute of Technology Bombay, Powai, Mumbai 400 076 (India)

2010-11-15T23:59:59.000Z

116

E-Print Network 3.0 - argonne fast source reactor Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

of the Omega Reactor Facility, Summary: fission. The benefits of a fast reactor over the water boiler reactor were a high intensity source offast... Reactors at Other Locations...

117

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2 reactor building decontamination. Summary status report. Volume 2  

SciTech Connect (OSTI)

This document summarizes information relating to decontamination of the Three Mile Island Unit 2 (TMI-2) reactor building. The report covers activities for the period of June 1, 1979 through March 29, 1985. The data collected from activity reports, reactor containment entry records, and other sources were entered into a computerized data system which permits extraction/manipulation of specific information which can be used in planning for recovery from an accident similar to that experienced at TMI-2 on March 28, 1979. This report contains summaries of man-hours, manpower, and radiation exposures incurred during decontamination of the reactor building. Support activities conducted outside of radiation areas are excluded from the scope of this report. Computerized reports included in this document are: a chronological summary listing work performed relating to reactor building decontamination for the period specified; and summary reports for each major task during the period. Each task summary is listed in chronological order for zone entry and subtotaled for the number of personnel entries, exposures, and man-hours. Manually-assembled table summaries are included for: labor and exposures by department and labor and exposures by major activity.

Doerge, D.H.; Miller, R.L.; Scotti, K.S.

1986-05-01T23:59:59.000Z

118

DOE - Office of Legacy Management -- Naval Oil Shale Reserves...  

Office of Legacy Management (LM)

Oil Shale Reserves Site - 013 FUSRAP Considered Sites Site: Naval Oil Shale Reserves Site (013 ) Designated Name: Alternate Name: Location: Evaluation Year: Site Operations: Site...

119

13.400 Introduction to Naval Architecture, Fall 2004  

E-Print Network [OSTI]

Introduction to principles of naval architecture, ship geometry, hydrostatics, calculation and drawing of curves of form, intact and damaged stability, hull structure strength calculations and ship resistance. Projects ...

Herbein, David

120

Naval Construction Battalion Center Gulfport- Mississippi Power Partnership Success Story  

Broader source: Energy.gov [DOE]

Presentation covers the Naval Construction Battalion Center Gulfport - Mississippi Power Partnership success story given at the Spring 2009 Federal Utility Partnership Working Group (FUPWG) meeting...

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

DOE - Office of Legacy Management -- Naval Petroleum Reserve...  

Office of Legacy Management (LM)

Naval Petroleum Reserve No. 3 is located in Natrona County, Wyoming. The site is a small oil field and covers approximately 9400 acres. Environmental remediation efforts are...

122

DOE-STD-3007-93 CN-1; DOE Standard Guidelines For Preparing Criticality Safety Evaluations at Department of Energy Non-Reactor Nuclear Facilities  

Broader source: Energy.gov (indexed) [DOE]

7-93 7-93 November 1993 CHANGE NOTICE NO. 1 September 1998 DOE STANDARD GUIDELINES FOR PREPARING CRITICALITY SAFETY EVALUATIONS AT DEPARTMENT OF ENERGY NON-REACTOR NUCLEAR FACILITIES U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. This document has been reproduced directly from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge, TN 37831; (423) 576-8401. Available to the public from the U.S. Department of Commerce, Technology Administration, National Technical Information Service, Springfield, VA 22161; (703) 605-6000. Order No. DE98003918 Change Notice No. 1 DOE-STD-3007-93 September 1998

123

Naval Spent Fuel Rail Shipment Accident Exercise Objectives  

Broader source: Energy.gov (indexed) [DOE]

NAVAL SPENT FUEL RAIL SHIPMENT NAVAL SPENT FUEL RAIL SHIPMENT ACCIDENT EXERCISE OBJECTIVES * Familiarize stakeholders with the Naval spent fuel ACCIDENT EXERCISE OBJECTIVES Familiarize stakeholders with the Naval spent fuel shipping container characteristics and shipping practices * Gain understanding of how the NNPP escorts who accompany the spent fuel shipments will interact with civilian emergency services representatives g y p * Allow civilian emergency services agencies the opportunity to evaluate their response to a pp y p simulated accident * Gain understanding of how the communications links that would be activated in an accident involving a Naval spent fuel shipment would work 1 NTSF May 11 ACCIDENT EXERCISE TYPICAL TIMELINE * Conceptual/Organizational Meeting - April 6 E R T i d it t t d TYPICAL TIMELINE

124

Integrated Surface Geophysical Methods for Characterization of the Naval  

Open Energy Info (EERE)

Integrated Surface Geophysical Methods for Characterization of the Naval Integrated Surface Geophysical Methods for Characterization of the Naval Air Warfare Center, New Jersey Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Integrated Surface Geophysical Methods for Characterization of the Naval Air Warfare Center, New Jersey Author USGS Published Publisher Not Provided, 2013 DOI Not Provided Check for DOI availability: http://crossref.org Online Internet link for Integrated Surface Geophysical Methods for Characterization of the Naval Air Warfare Center, New Jersey Citation USGS. Integrated Surface Geophysical Methods for Characterization of the Naval Air Warfare Center, New Jersey [Internet]. 2013. [updated 2013/01/03;cited 2013/11/22]. Available from: http://water.usgs.gov/ogw/bgas/toxics/NAWC-surface.html

125

Facilities and Capabilities | Neutron Science | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SHARE Facilities and Capabilities ORNL operates two of the world's most powerful neutron scattering user facilities: the High Flux Isotope Reactor and the Spallation...

126

The Fast-spectrum Transmutation Experimental Facility FASTEF: Main design achievements (part 2: Reactor building design and plant layout) within the FP7-CDT collaborative project of the European Commission  

SciTech Connect (OSTI)

MYRRHA (Multi-purpose hybrid Research Reactor for High-tech Applications) is the flexible experimental accelerator-driven system (ADS) in development at SCK-CEN in replacement of its material testing reactor BR2. SCK-CEN in association with 17 European partners from industry, research centres and academia, responded to the FP7 (Seventh Framework Programme) call from the European Commission to establish a Central Design Team (CDT) for the design of a Fast Spectrum Transmutation Experimental Facility (FASTEF) able to demonstrate efficient transmutation and associated technology through a system working in subcritical and/or critical mode. The project has started on April 01, 2009 for a period of three years. In this paper, we present the latest concept of the reactor building and the plant layout. The FASTEF facility has evolved quite a lot since the intermediate reporting done at the ICAPP'10 and ICAPP'11 conferences 1,2. Many iterations have been performed to take into account the safety requirements. The present configuration enables an easy operation and maintenance of the facility, including the possibility to change large components of the reactor. In a companion paper 3, we present the latest configuration of the reactor core and primary system. (authors)

De Bruyn, D.; Engelen, J. [Belgian Nuclear Research Centre SCK CEN, Boeretang 200, 2400 Mol (Belgium); Ortega, A.; Aguado, M. P. [Empresarios Agrupados A.I.E., Magallanes 3, 28015 Madrid (Spain)

2012-07-01T23:59:59.000Z

127

The intense slow positron beam facility at the PULSTAR reactor and applications in nano-materials study  

SciTech Connect (OSTI)

An intense slow positron beam has been established at the PULSTAR nuclear research reactor of North Carolina State University. The slow positrons are generated by pair production in a tungsten moderator from gammarays produced in the reactor core and by neutron capture reactions in cadmium. The moderated positrons are electrostatically extracted and magnetically guided out of the region near the core. Subsequently, the positrons are used in two spectrometers that are capable of performing positron annihilation lifetime spectroscopy (PALS) and positron Doppler broadening spectroscopy (DBS) to probe the defect and free volume properties of materials. One of the spectrometers (e{sup +}-PALS) utilizes an rf buncher to produce a pulsed beam and has a timing resolution of 277 ps. The second spectrometer (Ps-PALS) uses a secondary electron timing technique and is dedicated to positronium lifetime measurements with an approximately 1 ns timing resolution. PALS measurements have been conducted in the e{sup +}-PALS spectrometer on a series of nano-materials including organic photovoltaic thin films, membranes for filtration, and polymeric fibers. These studies have resulted in understanding some critical issues related to the development of the examined nano-materials.

Liu, Ming; Moxom, Jeremy; Hawari, Ayman I. [Nuclear Reactor Program, Department of Nuclear Engineering, North Carolina State University, P.O. Box 7909, Raleigh, NC 27695 (United States); Gidley, David W. [Department of Physics, University of Michigan, 450 Church Street, Ann Arbor MI 48109 (United States)

2013-04-19T23:59:59.000Z

128

SUPPLEMENT ANALYSIS OF FOREIGN RESEARCH REACTOR srENT NUCLEAR FUEL  

Broader source: Energy.gov (indexed) [DOE]

FOREIGN RESEARCH REACTOR srENT NUCLEAR FUEL FOREIGN RESEARCH REACTOR srENT NUCLEAR FUEL TRANSPORTATION ALONG OTHER THAN~. PRESENTATIVE ROUTE FROM CONCORD NAVAL WEAPO~~ STATION TO IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LADORA TORY Introduction The Department of Energy is planning to transport foreign research reactor spent nuclear fuel by rail from the Concord Naval Weapons Station (CNWS), Concord, California, to the Idaho National Engineering and Environmental Laboratory (INEEL). The environmental analysis supporting the decision to transport, by rail or truck, foreign research reactor spent nuclear fuel from CNWS to the INEEL is contained in +he Final Environmental Impact Statement on a Proposed Nuclear Weapons Nonproliftration Policy Concerning Foreign Research Reactor

129

Occupational radiation exposure at commercial nuclear power reactors and other facilities 1996: Twenty-ninth annual report. Volume 18  

SciTech Connect (OSTI)

This report summarizes the occupational exposure data that are maintained in the US Nuclear Regulatory Commission`s (NRC) Radiation Exposure Information and Reporting System (REIRS). The bulk of the information contained in the report was compiled from the 1996 annual reports submitted by six of the seven categories of NRC licensees subject to the reporting requirements of 10 CFR 20.2206. Since there are no geologic repositories for high level waste currently licensed, only six categories will be considered in this report. Annual reports for 1996 were received from a total of 300 NRC licensees, of which 109 were operators of nuclear power reactors in commercial operation. Compilations of the reports submitted by the 300 licensees indicated that 138,310 individuals were monitored, 75,139 of whom received a measurable dose. The collective dose incurred by these individuals was 21,755 person-cSv (person-rem){sup 2} which represents a 13% decrease from the 1995 value. The number of workers receiving a measurable dose also decreased, resulting in the average measurable dose of 0.29 cSv (rem) for 1996. The average measurable dose is defined to be the total collective dose (TEDE) divided by the number of workers receiving a measurable dose. These figures have been adjusted to account for transient reactor workers. Analyses of transient worker data indicate that 22,348 individuals completed work assignments at two or more licensees during the monitoring year. The dose distributions are adjusted each year to account for the duplicate reporting of transient workers by multiple licensees. In 1996, the average measurable dose calculated from reported was 0.24 cSv (rem). The corrected dose distribution resulted in an average measurable dose of 0.29 cSv (rem).

Thomas, M.L. [Nuclear Regulatory Commission, Washington, DC (United States). Div. of Regulatory Applications; Hagemeyer, D. [Science Applications International Corp., Oak Ridge, TN (United States)

1998-02-01T23:59:59.000Z

130

HFIR Experiment Facilities | ORNL Neutron Sciences  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Experiment Facilities Experiment Facilities HFIR Experiment Facilities Neutron Scattering Facilities Target Positions Experiment Facilities in the Beryllium Reflector Large Removable Beryllium Facilities Small Removable Beryllium Facilities Control-Rod Access Plug Facilities Small Vertical Experiment Facilities Large Vertical Experiment Facilities Hydraulic Tube Facility Peripheral Target Positions Neutron Activation Analysis (NAA) Laboratory and Pneumatic Tube Facilities Slant Engineering Facilities Gamma Irradiation Facility Quality Assurance Requirements Contact Information Neutron Scattering Facilities The fully instrumented HFIR will eventually include 15 state-of-the-art neutron scattering instruments, seven of which will be designed exclusively for cold neutron experiments, located in a guide hall south of the reactor

131

Hallam, Nebraska, Decommissioned Reactor Site Fact Sheet  

Office of Legacy Management (LM)

Program. Objectives for the reactor were fulfilled by 1966, and the Nebraska Public Power District decommissioned and dismantled the facility between 1967 and 1969. Facility...

132

Naval Petroleum Reserve No. 3 Disposition Decision Analysis and Timeline  

Broader source: Energy.gov [DOE]

This Report to Congress provides a summary of the analysis supporting DOE's determination to dispose of the Naval Petroleum Reserve No. 3 through sale of all right, title, interest on the open market.

133

DOE - Office of Legacy Management -- Naval Gun Factory and Bureau...  

Office of Legacy Management (LM)

Gun Factory and Bureau of Ordnance - DC 0-01 FUSRAP Considered Sites Site: NAVAL GUN FACTORY AND BUREAU OF ORDNANCE (DC.0-01) Eliminated from consideration under FUSRAP - Referred...

134

Technical Feasibility Study for Deployment of Ground-Source Heat Pump Systems: Portsmouth Naval Shipyard -- Kittery, Maine  

SciTech Connect (OSTI)

The U.S. Environmental Protection Agency (EPA) Office of Solid Waste and Emergency Response, in accordance with the RE-Powering America's Lands initiative, engaged the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) to conduct feasibility studies to assess the viability of developing renewable energy generating facilities on contaminated sites. Portsmouth Naval Shipyard (PNSY) is a United States Navy facility located on a series of conjoined islands in the Piscataqua River between Kittery, ME and Portsmouth, NH. EPA engaged NREL to conduct a study to determine technical feasibility of deploying ground-source heat pump systems to help PNSY achieve energy reduction goals.

Hillesheim, M.; Mosey, G.

2014-11-01T23:59:59.000Z

135

Final sitewide environmental assessment for continued development of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming  

SciTech Connect (OSTI)

The Secretary of Energy is required by law to explore, prospect, conserve, develop, use, and operate the Naval Petroleum and Oil Shale Reserves. The Naval Petroleum Reserves Production Act of 1976 (Public Law 94-258), requires that the Naval Petroleum Reserves be produced at their maximum efficient rate (MER), consistent with sound engineering practices, for a period of six years. To fulfill this mission, DOE is proposing continued development activities which would include the drilling of approximately 250 oil production and injection (gas, water, and steam) wells, the construction of between 25 and 30 miles of associated gas, water, and steam pipelines, the installation of several production and support facilities, and the construction of between 15 and 20 miles of access roads. These drilling and construction estimates include any necessary activities related to the operation of the Rocky Mountain Oilfield Testing Center (RMOTC). The purpose of RMOTC will be to provide facilities and necessary support to government and private industry for testing and evaluating new oilfield and environmental technologies, and to transfer these results to the petroleum industry through seminars and publications. Continued development activities either have no potential to result in adverse environmental impacts or would only result in adverse impacts that could be readily mitigated. The small amounts of disturbed surface area will be reclaimed to its original natural state when production operations terminate. The preparation of an environmental impact statement is not required, and the DOE is issuing this Finding of No Significant Impact (FONSI). 73 refs.

NONE

1995-07-01T23:59:59.000Z

136

User Facilities | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

USER PORTAL USER PORTAL BTRICBuilding Technologies Research Integration Center CNMSCenter for Nanophase Materials Sciences CSMBCenter for Structural Molecular Biology CFTFCarbon Fiber Technology Facility HFIRHigh Flux Isotope Reactor MDF Manufacturing Demonstration Facility NTRCNational Transportation Research Center OLCFOak Ridge Leadership Computing Facility SNSSpallation Neutron Source Keeping it fresh at the Spallation Neutron Source Nanophase material sciences' nanotech toolbox Home | User Facilities SHARE ORNL User Facilities ORNL is home to a number of highly sophisticated experimental user facilities that provide unmatched capabilities to the broader scientific community, including a growing user community from universities, industry, and other laboratories research institutions, as well as to ORNL

137

Heat Transfer Simulation of Reactor Cavity Cooling System Experimental Facility using RELAP5-3D and Generation of View Factors using MCNP  

E-Print Network [OSTI]

As one of the most attractive reactor types, The High Temperature Gas-cooled Reactor (HTGR) is designed to be passively safe with the incorporation of Reactor Cavity Cooling System (RCCS). In this paper, a RELAP5-3D simulation model is set up based...

Wu, Huali

2013-08-08T23:59:59.000Z

138

DOE - Office of Legacy Management -- Norfolk Naval Station - VA 05  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Norfolk Naval Station - VA 05 Norfolk Naval Station - VA 05 FUSRAP Considered Sites Site: NORFOLK NAVAL STATION (VA.05) Eliminated from consideration under FUSRAP Designated Name: Not Designated Alternate Name: None Location: Norfolk , Virginia VA.05-1 Evaluation Year: 1993 VA.05-1 Site Operations: Demonstration of extinguishing a uranium fire at the Fire Fighters School for AEC contractors. VA.05-3 VA.05-2 Site Disposition: Eliminated - Potential for contamination considered remote based on the limited quantity of materials handled VA.05-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium VA.05-2 Radiological Survey(s): Yes - Health and Safety Monitoring during operations only VA.05-2 Site Status: Eliminated from consideration under FUSRAP

139

NPS-SCAT electrical power system ; Naval Postgraduate School Solar Cell Array Tester .  

E-Print Network [OSTI]

??The Naval Postgraduate School Solar Cell Array Tester (NPS-SCAT) seeks to expand the CubeSat knowledge base and provide learning possibilities at the Naval Postgraduate School.… (more)

Dorn, Lawrence Tyrone.

2009-01-01T23:59:59.000Z

140

MAX Fluid Dynamics facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

MAX Fluid Dynamics facility MAX Fluid Dynamics facility Capabilities Engineering Experimentation Reactor Safety Testing and Analysis Overview Nuclear Reactor Severe Accident Experiments MAX NSTF SNAKE Aerosol Experiments System Components Laser Applications Robots Applications Other Facilities Other Capabilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr MAX Fluid Dynamics facility Providing high resolution data for development of computational tools that model fluid flow and heat transfer within complex systems such as the core of a nuclear reactor. 1 2 3 4 5 Hot and cold air jets are mixed within a glass tank while laser-based anemometers and a high-speed infrared camera characterize fluid flow and heat transfer behavior. Click on image to view larger size image.

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

High Flux Isotope Reactor (HFIR) | U.S. DOE Office of Science...  

Office of Science (SC) Website

(SUF) Division SUF Home About User Facilities User Facilities Dev X-Ray Light Sources Neutron Scattering Facilities High Flux Isotope Reactor (HFIR) Lujan Neutron Scattering...

142

Report to the President on agreements and programs relating to the Naval Petroleum and Oil Shale Reserves  

SciTech Connect (OSTI)

The Department of Energy monitors commercial natural gas production activities along the boundaries of Naval Oil Shale Reserve No. 1 and Naval Oil Shale Reserve No. 3, which are located in Garfield County, Colorado, and were created in the early part of this century to provide a future source of shale oil for the military. In response to the private sector`s drilling of natural gas wells along the south and southwest boundaries of the Reserves, which began in the early 1980`s, the Department developed a Natural Gas Protection Program to protect the Government`s resources from drainage due to the increasing number of commercial gas wells contiguous to Naval Oil Shale Reserve No. 3. This report provides an update of the Gas Protection Program being implemented and the agreements that have been placed in effect since December 19, 1991, and also includes the one communitized well containing Naval Petroleum Reserve No. 3 lands. The Protection Program employs two methods to protect the Government`s resources: (1) sharing with the private sector in the costs and production of wells by entering into ``communitization`` agreements; and (2) drilling wholly-owned Government wells to ``offset`` commercial wells that threaten to drain natural gas from the Reserves. The methods designed to protect the Government`s resources are achieving their objective of abating gas drainage and migration. As a result of the Protection Program, the Department of Energy is able to produce natural gas and either sell its share on the open market or transfer it for use at Government facilities. The Natural Gas Protection Program is a reactive, ongoing program that is continually revised as natural gas transportation constraints, market conditions, and nearby commercial production activities change.

Not Available

1994-08-01T23:59:59.000Z

143

DOE - Office of Legacy Management -- Naval Supply Depot AEC Warehouse - NY  

Office of Legacy Management (LM)

Supply Depot AEC Warehouse - Supply Depot AEC Warehouse - NY 36 FUSRAP Considered Sites Site: NAVAL SUPPLY DEPOT, AEC WAREHOUSE (NY.36) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Building 546 , Scotia , New York NY.36-1 Evaluation Year: 1987 NY.36-1 Site Operations: This facility served as a storage and transshipment point for feed materials between the Hanford and commercial metal fabricators in the northeastern states. NY.36-1 NY.36-2 NY.36-3 Site Disposition: Eliminated - Referred to DOD NY.36-1 Radioactive Materials Handled: Yes Primary Radioactive Materials Handled: Uranium, Thorium Metals NY.36-1 NY.36-2 NY.36-3 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP - Referred to DOD NY.36-1

144

362 SDSU General Catalog 2012-2013 Naval Science  

E-Print Network [OSTI]

turbine, and diesel propulsion engines receive in-depth study. Leadership topics in an engineering setting Power and Maritime Affairs (3) Sea power and maritime affairs; general concept of sea power including Merchant Marine; role of naval warfare components used to support the Navy's mission; sea power

Gallo, Linda C.

145

368 SDSU General Catalog 2013-2014 Naval Science  

E-Print Network [OSTI]

turbine, and diesel propulsion engines receive in-depth study. Leadership topics in an engineering setting Power and Maritime Affairs (3) Sea power and maritime affairs; general concept of sea power including Merchant Marine; role of naval warfare components used to support the Navy's mission; sea power

Gallo, Linda C.

146

Naval Postgraduate School Monterey, California 93943-5138  

E-Print Network [OSTI]

-related challenges of the future. To fulfill its mission, the Naval Postgraduate School strives to sustain excellence to achieve three major goals: 1) academic programs that are nationally recognized and support the current that focus on the integration of teaching and research in direct support of the four pillars of Joint Visions

147

Naval Postgraduate School Monterey, California 93943-5138  

E-Print Network [OSTI]

challenges of the future. To fulfill its mission, the Naval Postgraduate School strives to sustain excellence research programs to achieve three major goals: 1) academic programs that are nationally recognized of the four pillars of Joint Visions 2010 and 2020 and their enabling technologies; and, 3) executive

148

Naval Postgraduate School Monterey, California 93943-5138  

E-Print Network [OSTI]

related challenges of the future. To fulfill its mission, the Naval Postgraduate School strives to sustain programs to achieve three major goals: 1) academic programs that are nationally recognized and support) institutes that focus on the integration of teaching and research in direct support of the four pillars

149

Naval Postgraduate School Monterey, California 93943-5138  

E-Print Network [OSTI]

the security of the United States. To fulfill its mission, the Naval Postgraduate School strives to sustain programs to achieve three major goals: 1) academic programs that are nationally recognized and support) institutes that focus on the integration of teaching and research in direct support of the four pillars

150

Naval Postgraduate School Monterey, California 93943-5138  

E-Print Network [OSTI]

-related challenges of the future. To fulfill its mission, the Naval Postgraduate School strives to sustain excellence Postgraduate School has aligned its education and supporting research programs to achieve three major goals: 1 of teaching and research in direct support of the four pillars of Joint Visions 2010 and 2020

151

Calculation of the Naval Long and Short Waste Package Three-Dimensional Thermal Interface Temperatures  

SciTech Connect (OSTI)

The purpose of this calculation is to evaluate the thermal performance of the Naval Long and Naval Short spent nuclear fuel (SNF) waste packages (WP) in the repository emplacement drift. The scope of this calculation is limited to the determination of the temperature profiles upon the surfaces of the Naval Long and Short SNF waste package for up to 10,000 years of emplacement. The temperatures on the top of the outside surface of the naval canister are the thermal interfaces for the Naval Nuclear Propulsion Program (NNPP). The results of this calculation are intended to support Licensing Application design activities.

H. Marr

2006-10-25T23:59:59.000Z

152

Reactor operation safety information document  

SciTech Connect (OSTI)

The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

Not Available

1990-01-01T23:59:59.000Z

153

R- AND P- REACTOR BUILDING IN-SITU DECOMISSIONING VISUALIZATION  

SciTech Connect (OSTI)

During the early 1950s, five production reactor facilities were built at the Savannah River Site. These facilities were built to produce materials to support the building of the nation's nuclear weapons stockpile in response to the Cold War. R-Reactor and P-Reactor were the first two facilities completed in 1953 and 1954.

Bobbitt, J.; Vrettos, N.; Howard, M.

2010-06-15T23:59:59.000Z

154

Nuclear Reactor (atomic reactor)  

Science Journals Connector (OSTI)

A nuclear reactor splits Uranium or Plutonium nuclei, and the...235 is fissionable but more than 99% of the naturally occurring Uranium is U238 that makes enrichment mandatory. In some reactors U238 and Thorium23...

2008-01-01T23:59:59.000Z

155

Naval Construction Battalion Center Gulfport - Mississippi Power Partnership Success Story  

Broader source: Energy.gov (indexed) [DOE]

Construction Battalion Center Construction Battalion Center Gulfport - Mississippi Power Partnership Success Story Utilities Hardening Project Joe Bosco May 5, 2009 May 5, 2009 * Naval Construction Battalion Center * Established 1942 - Gulfport * Home of Atlantic Fleet Seabees Home of Atlantic Fleet Seabees * Mission: Prepare for & support all facets of the mobilization of construction forces * Naval Construction Battalion Center * 1,100 Acres * 9+ MVA; $3M/yr in Electricity 9+ MVA; $3M/yr in Electricity * One of two Battalion Centers in U.S. * Economic Impact - $500M Mississippi Power Company * Headquartered - Gulfport * Subsidiary y of Southern Comp pany y * Serves 23 counties Southeast Mississippi * 192,000 retail customers * * Generating capacity: 3 166 192 kW Generating capacity: 3,166,192 kW

156

DOE Designated User Facilities Multiple Laboratories * ARM Climate Research Facility  

Broader source: Energy.gov (indexed) [DOE]

Designated User Facilities Designated User Facilities Multiple Laboratories * ARM Climate Research Facility Argonne National Laboratory * Advanced Photon Source (APS) * Electron Microscopy Center for Materials Research * Argonne Tandem Linac Accelerator System (ATLAS) * Center for Nanoscale Materials (CNM) * Argonne Leadership Computing Facility (ALCF) * Brookhaven National Laboratory * National Synchrotron Light Source (NSLS) * Accelerator Test Facility (ATF) * Relativistic Heavy Ion Collider (RHIC) * Center for Functional Nanomaterials (CFN) * National Synchrotron Light Source II (NSLS-II ) (under construction) Fermi National Accelerator Laboratory * Fermilab Accelerator Complex Idaho National Laboratory * Advanced Test Reactor ** * Wireless National User Facility (WNUF)

157

Recovery Act Progress Update: Reactor Closure Feature  

ScienceCinema (OSTI)

A Recovery Act Progress Update. Decommissioning of two nuclear reactor sites at the Department of Energy's facilities has been approved and is underway.

Cody, Tom

2012-06-14T23:59:59.000Z

158

B Reactor | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Operational Management » History » Manhattan Project » Signature Operational Management » History » Manhattan Project » Signature Facilities » B Reactor B Reactor B Reactor Completed in September 1944, the B Reactor was the world's first large-scale plutonium production reactor. As at Oak Ridge, the need for labor turned Hanford into an atomic boomtown, with the population reaching 50,000 by summer 1944. Similar to the X-10 Graphite Reactor at Oak Ridge in terms of loading and unloading fuel, the B Reactor was built on a much larger scale and used water rather than air as a coolant. Whereas the X-10 had an initial design output of 1,000 kilowatts, the B Reactor was designed to operate at 250,000 kilowatts. Consisting of a 28- by 36-foot, 1,200-ton graphite cylinder lying on its side, the reactor was penetrated through its

159

Evaluation of nuclear facility decommissioning projects. Three Mile Island Unit 2 reactor coolant system and systems decontamination. Summary status report. Volume 1  

SciTech Connect (OSTI)

This document summarizes information relating to the decontamination and restoration of the Three Mile Island Unit 2 reactor coolant system and other plant systems. Data have been collected from activity reports, reactor containment entry records, and other sources and entered in a computerized data system which permits extraction/manipulation of specific data which can be used in planning for recovery from a loss of coolant event similar to that experienced by the Three Mile Island Unit 2 on March 28, 1979. This report contains a summary of radiation exposures, manpower, and time spent in radiation areas during the referenced period. Support activities conducted outside of radiation areas are not included. Computer reports included are: A chronological listing of all activities related to decomtamination and restoration of the reactor coolant system and other plant systems for the period of April 5, 1979, through December 19, 1984; a summary of labor and exposures by department for the same time period; and summary reports for each major task undertaken in connection with this specific work scope during the referenced time period.

Doerge, D.H.; Miller, R.L.; Scotti, K.S.

1986-05-01T23:59:59.000Z

160

E-Print Network 3.0 - andreyev bay naval Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

at the exact location (inside the bay) where the naval operations take place... . Armstrong, 2004. Prediction of instantaneous currents in San Diego ... Source: Chu, Peter C. -...

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Frequently Asked Questions Regarding DOE-STD-1195-2011, Design of Safety Significant Safety Instrumented Systems Used at DOE Non-Reactor Nuclear Facilities  

Broader source: Energy.gov [DOE]

Frequently Asked Questions Regarding DOE-STD-1195-2011 which provides requirements and guidance for the design, procurement, installation, testing, maintenance, operation, and quality assurance of safety instrumented systems (SIS) that may be used at Department of Energy (DOE) nonreactor nuclear facilities for safety significant (SS) functions.

162

Board of Advisors to the Presidents of the Naval Postgraduate School and the Naval War College Annual Joint Meeting of the Subcommittees: Board of Advisors to the President, Naval Postgraduate  

E-Print Network [OSTI]

as the NPS sub-committee board members reviewed SECNAVINST 1524.2B. During the lunch (Advanced Education Review Board). The AERB was originally put in placeBoard of Advisors to the Presidents of the Naval Postgraduate School

163

SPECKLE INTERFEROMETRY AT THE U.S. NAVAL OBSERVATORY. XVII  

SciTech Connect (OSTI)

The results of 3362 intensified CCD observations of double stars, made with the 26 inch refractor of the U.S. Naval Observatory, are presented. Each observation of a system represents a combination of over 2000 short-exposure images. These observations are averaged into 1970 mean relative positions and range in separation from 0.''78 to 72.''17, with a mean separation of 14.''76. This is the 17th in this series of papers and covers the period 2010 January 6 through December 20. Also presented are 10 pairs that are resolved for the first time.

Mason, Brian D.; Hartkopf, William I.; Wycoff, Gary L., E-mail: bdm@usno.navy.mil, E-mail: wih@usno.navy.mil [U.S. Naval Observatory, 3450 Massachusetts Avenue, NW, Washington, DC 20392-5420 (United States)

2011-08-15T23:59:59.000Z

164

SPECKLE INTERFEROMETRY AT THE U.S. NAVAL OBSERVATORY. XV  

SciTech Connect (OSTI)

Results of 2433 intensified CCD observations of double stars, made with the 26 inch refractor of the U.S. Naval Observatory, are presented. Each observation of a system represents a combination of over 2000 short-exposure images. These observations are averaged into 1013 mean relative positions and range in separation from 0.''96 to 58.''05, with a mean separation of 13.''50. This paper is the 15th in the series of papers and covers the period 2008 January 3 through 2008 December 21.

Mason, Brian D.; Hartkopf, William I.; Wycoff, Gary L., E-mail: bdm@usno.navy.mi, E-mail: wih@usno.navy.mi, E-mail: glw@usno.navy.mi [U.S. Naval Observatory, 3450 Massachusetts Avenue, NW, Washington, DC 20392-5420 (United States)

2010-08-15T23:59:59.000Z

165

Reactor Safety Research Programs  

SciTech Connect (OSTI)

This document summarizes the work performed by Pacific Northwest Laboratory (PNL) from January 1 through March 31, 1981, for the Division of Reactor Safety Research within the U.S. Nuclear Regulatory Commission (NRC). Evaluations of nondestructive examination (NDE) techniques and instrumentation are reported; areas of investigation include demonstrating the feasibility of determining the strength of structural graphite, evaluating the feasibility of detecting and analyzing flaw growth in reactor pressure boundary systems, examining NDE reliability and probabilistic fracture mechanics, and assessing the integrity of pressurized water reactor (PWR) steam generator tubes where service-induced degradation has been indicated. Experimental data and analytical models are being provided to aid in decision-making regarding pipeto- pipe impacts following postulated breaks in high-energy fluid system piping. Core thermal models are being developed to provide better digital codes to compute the behavior of full-scale reactor systems under postulated accident conditions. Fuel assemblies and analytical support are being provided for experimental programs at other facilities. These programs include loss-ofcoolant accident (LOCA) simulation tests at the NRU reactor, Chalk River, Canada; fuel rod deformation, severe fuel damage, and postaccident coolability tests for the ESSOR reactor Super Sara Test Program, Ispra, Italy; the instrumented fuel assembly irradiation program at Halden, Norway; and experimental programs at the Power Burst Facility, Idaho National Engineering Laboratory (INEL). These programs will provide data for computer modeling of reactor system and fuel performance during various abnormal operating conditions.

Edler, S. K.

1981-07-01T23:59:59.000Z

166

Fallon Naval Air Station Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

Page Page Edit with form History Facebook icon Twitter icon » Fallon Naval Air Station Geothermal Area Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Geothermal Resource Area: Fallon Naval Air Station Geothermal Area Contents 1 Area Overview 2 History and Infrastructure 3 Regulatory and Environmental Issues 4 Exploration History 5 Well Field Description 6 Geology of the Area 7 Geofluid Geochemistry 8 NEPA-Related Analyses (0) 9 Exploration Activities (0) 10 References Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"TERRAIN","zoom":6,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"500px","height":"300px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":39.38,"lon":-118.65,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

167

EA-0531: Proposed Natural Gas Protection Program for Naval Oil Shale  

Broader source: Energy.gov (indexed) [DOE]

31: Proposed Natural Gas Protection Program for Naval Oil 31: Proposed Natural Gas Protection Program for Naval Oil Shale Reserves Nos. 1 and 3, Garfield County, Colorado EA-0531: Proposed Natural Gas Protection Program for Naval Oil Shale Reserves Nos. 1 and 3, Garfield County, Colorado SUMMARY This EA evaluates the environmental impacts of a proposal for a Natural Gas Protection Program for Naval Oil Shale Reserves Nos. 1 and 3 which would be implemented over a five-year period that would encompass a total of 200 wells in Garfield County, Colorado. PUBLIC COMMENT OPPORTUNITIES None available at this time. DOCUMENTS AVAILABLE FOR DOWNLOAD August 9, 1991 EA-0531: Final Environmental Assessment Proposed Natural Gas Protection Program for Naval Oil Shale Reserves Nos. 1 and 3 August 9, 1991 EA-0531: Finding of No Significant Impact

168

Radiological performance assessment for the E-Area Vaults Disposal Facility  

SciTech Connect (OSTI)

The E-Area Vaults (EAVs) located on a 200 acre site immediately north of the current LLW burial site at Savannah River Site will provide a new disposal and storage site for solid, low-level, non-hazardous radioactive waste. The EAV Disposal Facility will contain several large concrete vaults divided into cells. Three types of structures will house four designated waste types. The Intermediate Level Non-Tritium Vaults will receive waste radiating greater than 200 mR/h at 5 cm from the outer disposal container. The Intermediate Level Tritium Vaults will receive waste with at least 10 Ci of tritium per package. These two vaults share a similar design, are adjacent, share waste handling equipment, and will be closed as one facility. The second type of structure is the Low Activity Waste Vaults which will receive waste radiating less than 200 mR/h at 5 cm from the outer disposal container and containing less than 10 Ci of tritium per package. The third facility, the Long Lived Waste Storage Building, provides covered, long term storage for waste containing long lived isotopes. Two additional types of disposal are proposed: (1) trench disposal of suspect soil, (2) naval reactor component disposal. To evaluate the long-term performance of the EAVs, site-specific conceptual models were developed to consider: (1) exposure pathways and scenarios of potential importance; (2) potential releases from the facility to the environment; (3) effects of degradation of engineered features; (4) transport in the environment; (5) potential doses received from radionuclides of interest in each vault type.

Cook, J.R.; Hunt, P.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

1994-04-15T23:59:59.000Z

169

Nuclear Reactor Safety Design Criteria  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes nuclear safety criteria applicable to the design, fabrication, construction, testing, and performance requirements of nuclear reactor facilities and safety class structures, systems, and components (SSCs) within these facilities. Cancels paragraphs 8a and 8b of DOE 5480.6. Cancels DOE O 5480.6 in part. Certified 11-18-10.

1993-01-19T23:59:59.000Z

170

Laser in situ keratomileusis in United States Naval aviators  

Science Journals Connector (OSTI)

Purpose To evaluate the safety and efficacy of femtosecond-assisted wavefront-guided laser in situ keratomileusis (LASIK) as well as higher-order aberrometric changes in a population of active-duty United States Naval aviators. Setting Navy Refractive Surgery Centers, San Diego, California, and Portsmouth, Virginia, USA. Design Prospective noncomparative 2-site study. Methods In this study of femtosecond-assisted wavefront-guided LASIK, 3 groups were differentiated according to the refractive status: myopia, mixed astigmatism, and hyperopia. Uncorrected (UDVA) and corrected (CDVA) distance visual acuities, refraction, mesopic low-contrast CDVA, higher-order aberrations (HOAs), and patient satisfaction were evaluated during a 3-month follow-up. Results The study enrolled, treated, and included for analysis 548 eyes with myopia, 60 eyes with mixed astigmatism, and 25 eyes with hyperopia. The UDVA was 20/20 or better in 98.3% of eyes with myopia and mixed astigmatism at all postoperative visits and in 95.7% of hyperopic eyes 3 months postoperatively. The gain in CDVA was 1 or more lines in 39.2%, 41.1%, and 30.4% of myopic, mixed astigmatic and hyperopic eyes, respectively. Loss of 2 lines of CDVA after surgery occurred in 2 myopic eyes (0.4%). At 3 months, a mean change of +0.03 ?m ± 0.10 (SD) and +0.05 ± 0.08 ?m was observed in higher-order root mean square and primary spherical aberration, respectively. Of the patients, 95.9% said they believed that LASIK had helped their effectiveness as Naval aviators and 99.6% would recommend the same treatment to others. Conclusion Femtosecond-assisted wavefront-guided LASIK was an efficacious and safe option for refractive correction in Naval aviators, enabling a quick return to flight status. Financial Disclosure Drs. Tanzer and Schallhorn are consultants to Abbott Medical Optics, Inc. No author has a financial or proprietary interest in any material or method mentioned.

David J. Tanzer; Tyson Brunstetter; Richard Zeber; Elizabeth Hofmeister; Sandor Kaupp; Neil Kelly; Myah Mirzaoff; William Sray; Mitch Brown; Steven Schallhorn

2013-01-01T23:59:59.000Z

171

Southwest Division, Naval Facilities Engineering Command, Demand Side Management Program Implementation  

E-Print Network [OSTI]

the many benefits of this program is the short time between initial audit and contract award. A project can be under construction within 60 days of completion of the audit. Light Emitting Diode (LED) Exit Signs - Over 9700 LED Exit Signs have been... the many benefits of this program is the short time between initial audit and contract award. A project can be under construction within 60 days of completion of the audit. Light Emitting Diode (LED) Exit Signs - Over 9700 LED Exit Signs have been...

Gates, G. G.

172

Commander, Naval Base ATTN: Ms. Cheryl Barnett Building N-26  

Office of Legacy Management (LM)

.J>?j 1.2 1990 .J>?j 1.2 1990 Commander, Naval Base ATTN: Ms. Cheryl Barnett Building N-26 Code N 9 E Norfolk, Virginia 23511-6002 Dear Ms. Barnett: I enjoyed speaking with you on the phone. The Department of Energy (DOE) has established its Formerly Utilized Sites Remedial Action Program (FUSRAP) to identify sites formerly utilized by its predecessor agencies in the early days of the nation's atomic energy program and to determine the potential for these sites to contain radiological contamination, related to DOE's past activities, which may require remedial action. When necessary, radiological surveys of individual sites are performed to provide the data necessary to make this necessary determination. As we discussed, in July 1956, the Atomic Energy Commission (a DOE

173

SPECKLE INTERFEROMETRY AT THE U.S. NAVAL OBSERVATORY. XIX  

SciTech Connect (OSTI)

The results of 2916 intensified CCD observations of double stars, made with the 26 inch refractor of the U.S. Naval Observatory, are presented. Each observation of a system represents a combination of over two thousand short-exposure images. These observations are averaged into 1584 mean relative positions and range in separation from 0.''54 to 98.''09, with a median separation of 11.''73. This is the 19th in this series of papers and covers the period 2012 January 5 through 2012 December 18. Also presented are 10 pairs that are reported for the first time, 17 pairs that appear to be lost, linear elements for 18 pairs, and orbital elements for 2 additional pairs.

Mason, Brian D.; Hartkopf, William I.; Hurowitz, Haley M., E-mail: bdm@usno.navy.mil, E-mail: wih@usno.navy.mil, E-mail: hurowitz@mit.edu [U.S. Naval Observatory, 3450 Massachusetts Avenue, NW, Washington, DC 20392-5420 (United States)

2013-09-15T23:59:59.000Z

174

SPECKLE INTERFEROMETRY AT THE U.S. NAVAL OBSERVATORY. XVIII  

SciTech Connect (OSTI)

The results of 2490 intensified CCD observations of double stars, made with the 26 inch refractor of the U.S. Naval Observatory, are presented. Each observation of a system represents a combination of over 2000 short-exposure images. These observations are averaged into 1462 mean relative positions and range in separation from 0.''56 to 71.''80, with a mean separation of 14.''81. This is the 18th in this series of papers and covers the period 2011 January 3 through 2011 December 18. Also presented are four pairs which are resolved for the first time, thirteen other pairs which appear to be lost, and linear elements for four additional pairs.

Mason, Brian D.; Hartkopf, William I.; Friedman, Elizabeth A., E-mail: bdm@usno.navy.mil, E-mail: wih@usno.navy.mil, E-mail: efriedman09@ucla.edu [U.S. Naval Observatory, 3450 Massachusetts Avenue, NW, Washington, DC 20392-5420 (United States)

2012-05-15T23:59:59.000Z

175

Naval Petroleum Reserves: assessment of alternative operating strategies beyond 1982  

SciTech Connect (OSTI)

Legislation authorizing production from two Naval Petroleum Reserves, i.e., NPR-1 (Elk Hills, California) and NPR-3 (Teapot Dome, Wyoming), expires in 1982. This paper presents an assessment of the trade-offs of extending production or returning to a shut-in status. Strategic, economic, and energy factors at the national, regional, and local levels are considered. The results of the study indicate that the only major local impact of shut-in will be on small refineries near NPR-1. At the national level, shut-in increases the size of the national petroleum reserve system. However, economic losses as measured by changes in the present value of real GNP also occur. The estimate of the increase in the size of the national petroleum reserve with shut-in of the NPRs was found to be most sensitive to the assumed length of future import interruptions.

Gsellman, L.R.; Mendis, M.S.; Rosenberg, J.I.

1981-08-01T23:59:59.000Z

176

LANSCE | Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Isotope Production Facility (IPF) Lujan Neutron Scattering Center Materials Test Station (MTS) Proton Radiography (pRad) Ultracold Neutrons (UCN) Weapons Neutron Research Facility...

177

Gas-cooled fast breeder reactor. Quarterly progress report, November 1, 1979 through January 31, 1980  

SciTech Connect (OSTI)

Information is presented concerning the nuclear steam supply system; reactor core; systems engineering; safety and reliability; and circulator test facility.

Not Available

1980-02-01T23:59:59.000Z

178

Microsoft Word - Tan Book.docx  

National Nuclear Security Administration (NNSA)

REPORT NT-12-4 MAY 2012 OCCUPATIONAL SAFETY, HEALTH, AND OCCUPATIONAL MEDICINE REPORT NAVAL NUCLEAR PROPULSION PROGRAM OFFICE OF NAVAL REACTORS WASHINGTON, D.C. 20585 DEPARTMENT OF THE NAVY WASHINGTON, D.C. 20350 This publication was printed on Recycled Paper i TABLE OF CONTENTS SUMMARY ...................................................................................................................... 1 NAVAL REACTORS PROGRAM BACKGROUND, MISSION, AND FACILITIES ............................................................................................ 2 Background ................................................................................................................ 2 Scope of Report ......................................................................................................... 3

179

Development Wells At Fallon Naval Air Station Area (Sabin, Et Al., 2010) |  

Open Energy Info (EERE)

Naval Air Station Area (Sabin, Et Al., 2010) Naval Air Station Area (Sabin, Et Al., 2010) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Development Wells At Fallon Naval Air Station Area (Sabin, Et Al., 2010) Exploration Activity Details Location Fallon Naval Air Station Area Exploration Technique Development Wells Activity Date Usefulness not indicated DOE-funding Unknown Notes As was mentioned previously, the Navy signed a development contract with Ormat in 2005 to produce power from a potential resource on the SE corner of the main side portion of NAS Fallon. Additionally the GPO began additional exploration activities on the Bombing Range 16 in collaboration with the Great Basin Center for Geothermal Energy. The introduction of $9.1M of Recovery Act funds in early 2009 led to a broadening as well as an

180

Sale of the Elk Hills Naval Petroleum Reserve | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Petroleum Reserves » Naval Reserves » Sale of the Elk Services » Petroleum Reserves » Naval Reserves » Sale of the Elk Hills Naval Petroleum Reserve Sale of the Elk Hills Naval Petroleum Reserve Energy Secretary Federico Pena (left) and Occidental Petroleum's David Hentschel sign the historic transfer agreement with Patricia Godley, DOE's Assistant Secretary for Fossil Energy, who orchestrated the sale, looking on. Energy Secretary Federico Pena (left) and Occidental Petroleum's David Hentschel sign the historic transfer agreement with Patricia Godley, DOE's Assistant Secretary for Fossil Energy, who orchestrated the sale, looking on. On February 5, 1998, the Department of Energy and Occidental Petroleum Corporation concluded the largest divestiture of federal property in the history of the U.S. government.

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

EA-1008: Continued Development of Naval Petroleum Reserve No. 3 (Sitewide), Natrona County, Wyoming  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of the proposal to continue development of the U.S. Department of Energy's Naval Petroleum Reserve No. 3 located in Natrona County, Wyoming over the next...

182

EIS-0158: Sale of the Naval Petroleum Reserve No. 1 at Elk Hills, California (1997)  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy developed this EIS to assess the potential environmental impacts of the continued operation of the Naval Petroleum Reserve No. 1 at the Maximum Efficient Rate authorized by Public Law 94-258.

183

Carl Vinson and pre-war naval legislation 1932-1940  

E-Print Network [OSTI]

in Congress who feared America would be drawn into another European war. Vinson also had to persuade fiscal conservatives opposed to increasing the budget deficit that funding naval construction was in the nation's best interests. Additionally, Vinson...

Svonavec, Stephen Charles

2012-06-07T23:59:59.000Z

184

Modular machinery arrangement and its impact in early-stage naval electric ship design  

E-Print Network [OSTI]

Electrical power demands for naval surface combatants are projected to rise with the development of increasingly complex and power intensive combat systems. This trend also coincides with the need of achieving maximum fuel ...

Jurkiewicz, David J. (David James)

2012-01-01T23:59:59.000Z

185

Design and analysis of a permanent magnet generator for naval applications  

E-Print Network [OSTI]

This paper discusses the electrical and magnetic design and analysis of a permanent magnet generation module for naval applications. Numerous design issues are addressed and several issues are raised about the potential ...

Rucker, Jonathan E. (Jonathan Estill)

2005-01-01T23:59:59.000Z

186

Analysis of harmonic distortion in an Integrated Power System for naval applications  

E-Print Network [OSTI]

This research quantifies the voltage distortion over the broad range of operating conditions experienced by a Naval warship. A steady state model of an Integrated Power System (IPS) was developed in a commercially available ...

West, Edward G., S.M. Massachusetts Institute of Technology

2005-01-01T23:59:59.000Z

187

RMOTC - Field Information - Equipment and Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Equipment & Facilities Equipment & Facilities Motor Grader at RMOTC Notice: As of July 15th 2013, the Department of Energy announced the intent to sell Naval Petroleum Reserve Number 3 (NPR3). The sale of NPR-3 will also include the sale of all equipment and materials onsite. A decision has been made by the Department of Energy to complete testing at RMOTC by July 1st, 2014. RMOTC will complete testing in the coming year with the currently scheduled testing partners. For more information on the sale of NPR-3 and sale of RMOTC equipment and materials please join our mailing list here. RMOTC's test facility has its own line of workover, support, and heavy equipment available for partner use on site. RMOTC can also offer its partners workspace on site in its Customer Operations Center which has

188

Nuclear Reactor Severe Accident Experiments  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nuclear Reactor Severe Accident Experiments Nuclear Reactor Severe Accident Experiments Capabilities Engineering Experimentation Reactor Safety Testing and Analysis Overview Nuclear Reactor Severe Accident Experiments MAX NSTF SNAKE Aerosol Experiments System Components Laser Applications Robots Applications Other Facilities Other Capabilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Nuclear Reactor Severe Accident Experiments 1 2 3 4 5 6 7 We perform experiments simulating reactor core melt phenomena in which molten core debris ("corium") erodes the concrete floor of a containment building. This occurred during the Fukushima nuclear power plant accident though the extent of concrete damage is yet unknown. This video shows the top view of a churning molten pool of uranium oxide at 2000°C (3600°F) seen during an experiment at Argonne. Corium behaves much like lava.

189

EIS-0068: Development Policy Options for the Naval Oil Shale Reserves in Colorado  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy Office of Naval Petroleum and Oil Shale Reserves prepared this programmatic statement to examine the environmental and socioeconomic impacts of development projects on the Naval Oil Shale Reserve 1, and examine select alternatives, such as encouraging production from other liquid fuel resources (coal liquefaction, biomass, offshore oil and enhanced oil recovery) or conserving petroleum in lieu of shale oil production.

190

SPECKLE INTERFEROMETRY AT THE U.S. NAVAL OBSERVATORY. XVI  

SciTech Connect (OSTI)

The results of 1031 speckle-interferometric observations of double stars, made with the 26 inch refractor of the U.S. Naval Observatory, are presented. Each speckle-interferometric observation of a system represents a combination of over two thousand short-exposure images. These observations are averaged into 457 mean relative positions and range in separation from 0.''15 to 16.''94, with a median separation of 3.''03. The range in V-band magnitudes for the primary (secondary) of observed targets is 3.1-12.9 (3.2-13.3). This is the sixteenth in a series of papers presenting measurements obtained with this system and covers the period 2009 January 12 through 2009 December 17. Included in these data are 12 older measurements whose positions were previously deemed possibly aberrant, but are no longer classified this way following a confirming observation. Also, 10 pairs with a single observation are herein confirmed. This paper also includes the first data obtained using a new ICCD with fiber optic cables.

Mason, Brian D.; Hartkopf, William I.; Wycoff, Gary L., E-mail: bdm@usno.navy.mil, E-mail: wih@usno.navy.mil [U.S. Naval Observatory, 3450 Massachusetts Avenue, NW, Washington, DC 20392-5420 (United States)

2011-05-15T23:59:59.000Z

191

Renewable Energy Optimization Report for Naval Station Newport  

SciTech Connect (OSTI)

In 2008, the U.S. Environmental Protection Agency (EPA) launched the RE-Powering America's Land initiative to encourage the development of renewable energy (RE) on potentially contaminated land and mine sites. As part of this effort, EPA is collaborating with the U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory (NREL) to evaluate RE options at Naval Station (NAVSTA) Newport in Newport, Rhode Island. NREL's Renewable Energy Optimization (REO) tool was utilized to identify RE technologies that present the best opportunity for life-cycle cost-effective implementation while also serving to reduce energy-related carbon dioxide emissions and increase the percentage of RE used at NAVSTA Newport. The technologies included in REO are daylighting, wind, solar ventilation preheating (SVP), solar water heating, photovoltaics (PV), solar thermal (heating and electric), and biomass (gasification and cogeneration). The optimal mix of RE technologies depends on several factors including RE resources; technology cost and performance; state, utility, and federal incentives; and economic parameters (discount and inflation rates). Each of these factors was considered in this analysis. Technologies not included in REO that were investigated separately per NAVSTA Newport request include biofuels from algae, tidal power, and ground source heat pumps (GSHP).

Robichaud, R.; Mosey, G.; Olis, D.

2012-02-01T23:59:59.000Z

192

Distributed energy resources at naval base ventura county building 1512  

SciTech Connect (OSTI)

This paper reports the findings of a preliminary assessment of the cost effectiveness of distributed energy resources at Naval Base Ventura County (NBVC) Building 1512. This study was conducted in response to the base's request for design assistance to the Federal Energy Management Program. Given the current tariff structure there are two main decisions facing NBVC: whether to install distributed energy resources (DER), or whether to continue the direct access energy supply contract. At the current effective rate, given assumptions about the performance and structure of building energy loads and available generating technology characteristics, the results of this study indicate that if the building installed a 600 kW DER system with absorption cooling and heat capabilities chosen by cost minimization, the energy cost savings would be about 14 percent, or $55,000 per year. However, under current conditions, this study also suggests that significant savings could be obtained if Building 1 512 changed from the direct access contract to a SCE TOU-8 (Southern California Edison time of use tariff number 8) rate without installing a DER system. At current SCE TOU-8 tariffs, the potential savings from installation of a DER system would be about 4 percent, or $15,000 per year.

Bailey, Owen C.; Marnay, Chris

2004-10-01T23:59:59.000Z

193

Facility Safety  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Establishes facility safety requirements related to: nuclear safety design, criticality safety, fire protection and natural phenomena hazards mitigation.

1996-10-24T23:59:59.000Z

194

Facility Safety  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Establishes facility safety requirements related to: nuclear safety design, criticality safety, fire protection and natural phenomena hazards mitigation.

1995-11-16T23:59:59.000Z

195

Certified Facilities  

Broader source: Energy.gov [DOE]

Industrial Leaders: The industrial facilities shown below are among the first to earn certification for Superior Energy Performance® (SEP™).

196

Using reactor operating experience to improve the design of a new Broad Application Test Reactor  

SciTech Connect (OSTI)

Increasing regulatory demands and effects of plant aging are limiting the operation of existing test reactors. Additionally, these reactors have limited capacities and capabilities for supporting future testing missions. A multidisciplinary team of experts developed sets of preliminary safety requirements, facility user needs, and reactor design concepts for a new Broad Application Test Reactor (BATR). Anticipated missions for the new reactor include fuels and materials irradiation testing, isotope production, space testing, medical research, fusion testing, intense positron research, and transmutation doping. The early BATR design decisions have benefited from operating experiences with existing reactors. This paper discusses these experiences and highlights their significance for the design of a new BATR.

Fletcher, C.D.; Ryskamp, J.M.; Drexler, R.L.; Leyse, C.F.

1993-07-01T23:59:59.000Z

197

DOE - Office of Legacy Management -- U S Naval Radiological Defense...  

Office of Legacy Management (LM)

1987 CA.0-06-1 Site Operations: NRC licensed DoD facility which used small quantities of nuclear materials for R&D purposes and decontaminated ships. Licensed to dispose of...

198

Transport reactor development status  

SciTech Connect (OSTI)

This project is part of METC`s Power Systems Development Facility (PSDF) located at Wilsonville, Alabama. The primary objective of the Advanced Gasifier module is to produce vitiated gases for intermediate-term testing of Particulate Control Devices (PCDs). The Transport reactor potentially allows particle size distribution, solids loading, and particulate characteristics in the off-gas stream to be varied in a number of ways. Particulates in the hot gases from the Transport reactor will be removed in the PCDs. Two PCDs will be initially installed in the module; one a ceramic candle filter, the other a granular bed filter. After testing of the initial PCDs they will be removed and replaced with PCDs supplied by other vendors. A secondary objective is to verify the performance of a Transport reactor for use in advanced Integrated Gasification Combined Cycle (IGCC), Integrated Gasification Fuel Cell (IG-FC), and Pressurized Combustion Combined Cycle (PCCC) power generation units. This paper discusses the development of the Transport reactor design from bench-scale testing through pilot-scale testing to design of the Process Development Unit (PDU-scale) facility at Wilsonville.

Rush, R.E.; Fankhanel, M.O.; Campbell, W.M.

1994-10-01T23:59:59.000Z

199

Radiation exposure assessment for portsmouth naval shipyard health studies  

Science Journals Connector (OSTI)

......shipyards 226 0.49 Training 177 0.79 Industry...working near an operating submarine reactor...number of affected personnel and the low doses...worker safety and training programmes. Figure...individuals eligible for selection to nested case-control...P. Study of a selection of 10 historical......

R. D. Daniels; T. D. Taulbee; P. Chen

2004-09-01T23:59:59.000Z

200

Naval R & D: Conversion Sought for Radiological Defense Lab  

Science Journals Connector (OSTI)

...7. W. E. Hoehn, The Economics of Nuclear Reactors for Power...P. Sporn in Nuclear Power Economics-1962 through 1967, report...First Int. Symp. Water Desalination [cited by Wolfo-witz...of the Committee on the Economics of Water Resource Development...

John Walsh

1969-06-06T23:59:59.000Z

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

BNL | Our History: Reactors as Research Tools  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

> See also: Accelerators > See also: Accelerators Brookhaven History: Using Reactors as Research Tools BGRR Brookhaven Graphite Research Reactor The Brookhaven Graphite Research Reactor (BGRR) was the Laboratory's first big machine and the first peace-time reactor built in the United States following World War II. The reactor's primary mission was to produce neutrons for scientific experimentation and to refine reactor technology. At the time, the BGRR could accommodate more simultaneous experiments than any other reactor. Scientists and engineers from every corner of the U.S. came to use the reactor, which was not only a source of neutrons for experiments, but also an excellent training facility. Researchers used the BGRR's neutrons as tools for studying atomic nuclei and the structure of solids, and to investigate many physical, chemical and

202

New case for naval arms control. Interim report, September-December 1992  

SciTech Connect (OSTI)

This paper opens with an examination of existing legal restraints on naval forces and arms control agreements and concludes that the U.S. is already heavily engaged in naval arms control. Given the new international security environment and the new U.S. regionally-oriented national security and military strategies, the author then recommends a series of additional naval arms control measures that should be taken: exchanges of data, transparency, INCSEA, cooperative measures, an agreement on the laws of submarine warfare, abolishing NCND, no first tactical nuclear use at sea, NWFZs, advanced notification of operational-level exercises, environmental protection measures, controls over maritime technologies, armed escorts of nuclear shipments, new Roes, PALs, the resolution of outstanding political issues at sea, deep cuts in nuclear forces, CFE follow-on, limits on specific types of naval forces, geographic limits, expanded standing naval forces, and a re negotiation of the ABM Treaty. The paper then addresses verification and compliance issues. Author concludes that since the U.S. Navy has already managed to avoid major arms control while balanced on the precarious slippery slope, there is no reason to continue its stonewalling policies.

Tritten, J.J.

1992-12-04T23:59:59.000Z

203

CANISTER HANDLING FACILITY CRITICALITY SAFETY CALCULATIONS  

SciTech Connect (OSTI)

This design calculation revises and updates the previous criticality evaluation for the canister handling, transfer and staging operations to be performed in the Canister Handling Facility (CHF) documented in BSC [Bechtel SAIC Company] 2004 [DIRS 167614]. The purpose of the calculation is to demonstrate that the handling operations of canisters performed in the CHF meet the nuclear criticality safety design criteria specified in the ''Project Design Criteria (PDC) Document'' (BSC 2004 [DIRS 171599], Section 4.9.2.2), the nuclear facility safety requirement in ''Project Requirements Document'' (Canori and Leitner 2003 [DIRS 166275], p. 4-206), the functional/operational nuclear safety requirement in the ''Project Functional and Operational Requirements'' document (Curry 2004 [DIRS 170557], p. 75), and the functional nuclear criticality safety requirements described in the ''Canister Handling Facility Description Document'' (BSC 2004 [DIRS 168992], Sections 3.1.1.3.4.13 and 3.2.3). Specific scope of work contained in this activity consists of updating the Category 1 and 2 event sequence evaluations as identified in the ''Categorization of Event Sequences for License Application'' (BSC 2004 [DIRS 167268], Section 7). The CHF is limited in throughput capacity to handling sealed U.S. Department of Energy (DOE) spent nuclear fuel (SNF) and high-level radioactive waste (HLW) canisters, defense high-level radioactive waste (DHLW), naval canisters, multicanister overpacks (MCOs), vertical dual-purpose canisters (DPCs), and multipurpose canisters (MPCs) (if and when they become available) (BSC 2004 [DIRS 168992], p. 1-1). It should be noted that the design and safety analyses of the naval canisters are the responsibility of the U.S. Department of the Navy (Naval Nuclear Propulsion Program) and will not be included in this document. In addition, this calculation is valid for the current design of the CHF and may not reflect the ongoing design evolution of the facility. However, it is anticipated that design changes to the facility layout will have little or no impact on the criticality results and/or conclusions presented in this document. This calculation is subject to the ''Quality Assurance Requirements and Description'' (DOE 2004 [DIRS 171539]) because the CHF is included in the Q-List (BSC 2005 [DIRS 171190], p. A-3) as an item important to safety. This calculation is prepared in accordance with AP-3.12Q, ''Design Calculations and Analyses'' [DIRS 168413].

C.E. Sanders

2005-04-07T23:59:59.000Z

204

Supplementary radiological and beryllium characterization of the facility at 425 Peek Street, Schenectady, New York  

SciTech Connect (OSTI)

At the request of the Office of Naval Reactors through the Office of Remedial Action and Waste Technology, a radiological survey of the Peek Street industrial facility, the adjacent state-owned bike path, and two nearby residential properties was conducted by Oak Ridge National Laboratory (ORNL) in November 1989. The results indicated small isolated areas that exceeded DOE guidelines. These areas totaled approximately 0.2 m{sup 2} of floor area and approximately 3 m{sup 2} of wall area inside the building, and two small areas totaling approximately 5 m{sup 2} outside the building. A small section of one of these areas extended beyond the fence on the east side of the industrial property onto the state-owned property. No residual radioactive material or elevated radiation levels were detected on any portion of the paved section of the bike path or the residential properties adjacent to the site. Because the elevated radiation levels were localized and limited in extent, any credible use scenario, including current use conditions, indicated that no significant radiation exposures would accrue to individuals frequenting the area. Samples were also analyzed for elemental beryllium since that material had formerly been used at the site. In conjunction with the planned remediation at the facility, a supplementary characterization survey was performed to further define the areas containing beryllium in excess of the identified guidelines. Additional radiological characterization of Ra-226, Th-232, and U-238 was also performed in areas that were largely inaccessible prior to the remediation efforts.

Foley, R.D.; Allred, J.F.; Carrier, R.F.

1994-10-01T23:59:59.000Z

205

Brookhaven Lab Completes Decommissioning of Graphite Research Reactor:  

Broader source: Energy.gov (indexed) [DOE]

Brookhaven Lab Completes Decommissioning of Graphite Research Brookhaven Lab Completes Decommissioning of Graphite Research Reactor: Reactor core and associated structures successfully removed; waste shipped offsite for disposal Brookhaven Lab Completes Decommissioning of Graphite Research Reactor: Reactor core and associated structures successfully removed; waste shipped offsite for disposal September 1, 2012 - 12:00pm Addthis The Brookhaven Graphite Research Reactor’s bioshield, which contains the 700-ton reactor core, is shown prior to decommissioning. The Brookhaven Graphite Research Reactor's bioshield, which contains the 700-ton reactor core, is shown prior to decommissioning. Pictured here is the Brookhaven Graphite Research Reactor, where major decommissioning milestones were recently reached after the remaining radioactive materials from the facility’s bioshield were shipped to a licensed offsite disposal facility.

206

Small Reactor for Deep Space Exploration  

ScienceCinema (OSTI)

This is the first demonstration of a space nuclear reactor system to produce electricity in the United States since 1965, and an experiment demonstrated the first use of a heat pipe to cool a small nuclear reactor and then harvest the heat to power a Stirling engine at the Nevada National Security Site's Device Assembly Facility confirms basic nuclear reactor physics and heat transfer for a simple, reliable space power system.

None

2014-05-30T23:59:59.000Z

207

Small Reactor for Deep Space Exploration  

SciTech Connect (OSTI)

This is the first demonstration of a space nuclear reactor system to produce electricity in the United States since 1965, and an experiment demonstrated the first use of a heat pipe to cool a small nuclear reactor and then harvest the heat to power a Stirling engine at the Nevada National Security Site's Device Assembly Facility confirms basic nuclear reactor physics and heat transfer for a simple, reliable space power system.

None

2012-11-29T23:59:59.000Z

208

NNSA B-Roll: MOX Facility  

SciTech Connect (OSTI)

In 1999, the National Nuclear Security Administration (NNSA) signed a contract with a consortium, now called Shaw AREVA MOX Services, LLC to design, build, and operate a Mixed Oxide (MOX) Fuel Fabrication Facility. This facility will be a major component in the United States program to dispose of surplus weapon-grade plutonium. The facility will take surplus weapon-grade plutonium, remove impurities, and mix it with uranium oxide to form MOX fuel pellets for reactor fuel assemblies. These assemblies will be irradiated in commercial nuclear power reactors.

2010-05-21T23:59:59.000Z

209

Estimating Fire Risks at Industrial Nuclear Facilities  

SciTech Connect (OSTI)

The Savannah River Site (SRS) has a wide variety of nuclear production facilities that include chemical processing facilities, machine shops, production reactors, and laboratories. Current safety documentation must be maintained for the nuclear facilities at SRS. Fire Risk Analyses (FRAs) are used to support the safety documentation basis. These FRAs present the frequency that specified radiological and chemical consequences will be exceeded. The consequence values are based on mechanistic models assuming specific fire protection features fail to function as designed.

Coutts, D.A.

1999-07-12T23:59:59.000Z

210

Science Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Electron Microscopy Lab Ion Beam Materials Lab Matter-Radiation Interactions in Extremes (MaRIE) Proton Radiography Trident Laser Facility LOOK INTO LANL - highlights...

211

Annual Report: 2010-2011 Storm Season Sampling For NON-DRY DOCK STORMWATER MONITORING FOR PUGET SOUND NAVAL SHIPYARD, BREMERTON, WA  

SciTech Connect (OSTI)

This interim report summarizes the stormwater monitoring conducted for non-dry dock outfalls in both the confined industrial area and the residential areas of Naval Base Kitsap within the Puget Sound Naval Shipyard (referred to as the Shipyard). This includes the collection, analyses, and descriptive statistics for stormwater sampling conducted from November 2010 through April 2011. Seven stormwater basins within the Shipyard were sampled during at least three storm events to characterize non-dry dock stormwater discharges at selected stormwater drains located within the facility. This serves as the Phase I component of the project and Phase II is planned for the 2011-2012 storm season. These data will assist the Navy, USEPA, Ecology and other stakeholders in understanding the nature and condition of stormwater discharges from the Shipyard and inform the permitting process for new outfall discharges. The data from Phase I was compiled with current stormwater data available from the Shipyard, Sinclair/Dyes Inlet watershed, and Puget Sound in order to support technical investigations for the Draft NPDES permit. The permit would require storm event sampling at selected stormwater drains located within the Shipyard. However, the data must be considered on multiple scales to truly understand potential impairments to beneficial uses within Sinclair and Dyes Inlets.

Brandenberger, Jill M.; Metallo, David; Johnston, Robert K.; Gebhardt, Christine; Hsu, Larry

2012-09-01T23:59:59.000Z

212

Facility Safety  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Order establishes facility and programmatic safety requirements for Department of Energy facilities, which includes nuclear and explosives safety design criteria, fire protection, criticality safety, natural phenomena hazards mitigation, and the System Engineer Program. Cancels DOE O 420.1A. DOE O 420.1B Chg 1 issued 4-19-10.

2005-12-22T23:59:59.000Z

213

Overview of Sandia National Laboratories pulse nuclear reactors  

SciTech Connect (OSTI)

Sandia National Laboratories has designed, constructed and operated bare metal Godiva-type and pool-type pulse reactors since 1961. The reactor facilities were designed to support a wide spectrum of research, development, and testing activities associated with weapon and reactor systems.

Schmidt, T.R. [Sandia National Labs., Albuquerque, NM (United States); Reuscher, J.A. [Texas A& M Univ., College Station, TX (United States)

1994-10-01T23:59:59.000Z

214

Updated 1-12 Mr. John C. Goodhart became the Vice Commander and senior civilian of the Naval Supply  

E-Print Network [OSTI]

is responsible for quality-of-life issues for our naval forces, including food service, postal services, Navy Executive Service since July 2002. NAVSUP's primary mission is to provide U.S. naval forces with quality supplies and services. The organization oversees logistics programs in the areas of supply operations

215

NUCLEAR REACTORS.  

E-Print Network [OSTI]

??Nuclear reactors are devices containing fissionable material in sufficient quantity and so arranged as to be capable of maintaining a controlled, self-sustaining NUCLEAR FISSION chain… (more)

Belachew, Dessalegn

2010-01-01T23:59:59.000Z

216

Mobile Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facility Facility AMF Information Science Architecture Baseline Instruments AMF1 AMF2 AMF3 Data Operations AMF Fact Sheet Images Contacts AMF Deployments Hyytiälä, Finland, 2014 Manacapuru, Brazil, 2014 Oliktok Point, Alaska, 2013 Los Angeles, California, to Honolulu, Hawaii, 2012 Cape Cod, Massachusetts, 2012 Gan Island, Maldives, 2011 Ganges Valley, India, 2011 Steamboat Springs, Colorado, 2010 Graciosa Island, Azores, 2009-2010 Shouxian, China, 2008 Black Forest, Germany, 2007 Niamey, Niger, 2006 Point Reyes, California, 2005 Mobile Facilities Pictured here in Gan, the second mobile facility is configured in a standard layout. Pictured here in Gan, the second mobile facility is configured in a standard layout. To explore science questions beyond those addressed by ARM's fixed sites at

217

Brookhaven Graphite Research Reactor Workshop | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Services » Site & Facility Restoration » Deactivation & Services » Site & Facility Restoration » Deactivation & Decommissioning (D&D) » D&D Workshops » Brookhaven Graphite Research Reactor Workshop Brookhaven Graphite Research Reactor Workshop The Brookhaven Graphite Research Reactor (BGRR) was the first reactor built in the U.S. for peacetime atomic research following World War II. Construction began in 1947 and the reactor started operating in August 1950. In the next 18 years, an estimated 25,000 scientific experiments were carried out at the BGRR using neutrons produced in the facility's 700-ton graphite core, made up of more than 60,000 individual graphite blocks. The BGRR was placed on standby in 1968 and then permanently shut down as the next-generation reactor, the High Flux Beam Reactor (HFBR), was

218

History of Research Reactors at Brookhaven  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

History of Research Reactors at Brookhaven History of Research Reactors at Brookhaven Brookhaven National Laboratory has three nuclear reactors on its site that were used for scientific research. The reactors are all shut down, and the Laboratory is addressing environmental issues associated with their operations. photo of BGRR Brookhaven Graphite Research Reactor - Beginning operations in 1950, the graphite reactor was used for research in medicine, biology, chemistry, physics and nuclear engineering. One of the most significant achievements at this facility was the development of technetium-99m, a radiopharmaceutical widely used to image almost any organ in the body. The graphite reactor was shut down in 1969. Parts of it have been decommissioned, with the remainder to be addressed by 2011. More history

219

Modeling of Coastal Inundation, Storm Surge, and Relative Sea-Level Rise at Naval Station Norfolk, Norfolk, Virginia, U.S.A.  

E-Print Network [OSTI]

Modeling of Coastal Inundation, Storm Surge, and Relative Sea- Level Rise at Naval Station Norfolk. Modeling of coastal inundation, storm surge, and relative sea-level rise at Naval Station Norfolk, Norfolk, and relative sea-level-rise (RSLR) scenarios were examined at the U.S. Naval Station, Norfolk, Virginia

US Army Corps of Engineers

220

Reactor Core Assembly - HFIR Technical Parameters | ORNL Neutron Sciences  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Home › Facilities › HFIR › Reactor Core Assembly Home › Facilities › HFIR › Reactor Core Assembly Reactor Core Assembly The reactor core assembly is contained in an 8-ft (2.44-m)-diameter pressure vessel located in a pool of water. The top of the pressure vessel is 17 ft (5.18 m) below the pool surface, and the reactor horizontal mid-plane is 27.5 ft (8.38 m) below the pool surface. The control plate drive mechanisms are located in a subpile room beneath the pressure vessel. These features provide the necessary shielding for working above the reactor core and greatly facilitate access to the pressure vessel, core, and reflector regions. In-core irradiation and experiment locations (cross section at horizontal midplane) Reactor core assembly Reactor core assembly: (1) in-core irradiation and experiment locations,

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

Facility Safety  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish facility safety requirements for the Department of Energy, including National Nuclear Security Administration. Cancels DOE O 420.1. Canceled by DOE O 420.1B.

2002-05-20T23:59:59.000Z

222

Naval Research Laboratory Memorandum Report, 2003 Perceptual and Ergonomic Issues in  

E-Print Network [OSTI]

Naval Research Laboratory Memorandum Report, 2003 1 Perceptual and Ergonomic Issues in Mobile paradigm, the field needs a much better understanding of the fundamental perceptual and ergonomic issues aimed at both understanding the fundamental perceptual and ergonomic issues in AR display

Swan II, J. Edward

223

Karen Swider-Lyons, Peter Bouwman, Norma Ugarte Naval Research Laboratory  

E-Print Network [OSTI]

metal oxides for PEMFC cathodes Low-platinum hydrous metal oxides for PEMFC cathodes #12;Naval Research-NbPOx compounds Receive LANL test results for Pt-FePOx catalyst performance in a PEMFC - poor performance Acquire on lowering Pt in fuel cell cathode · Cathode has most Pt because slow oxygen reduction kinetics poor Pt

224

Naval Station Norfolk, VA- Energy Conservation Program UESC Partnership Success Story  

Broader source: Energy.gov [DOE]

Presentation—given at the Federal Utility Partnership Working Group (FUPWG) Fall 2008 meeting—covers the basis for success of a U.S. Navy utility energy service contract (UESC) project at a Naval Station in Norfolk, Virginia, including the project phases and why the utility partnership works.

225

Boiler Upgrades and Decentralizing Steam Systems Save Water and Energy at Naval Air Station Oceana  

Broader source: Energy.gov [DOE]

Case study details Naval Air Station Oceana findings that its heating needs could be met more efficiently by replacing its central plant with a combination of distributed boilers and ground source heat pumps. The results saved more than 1 million MBtu in energy and 19,574 Kgal of water annually.

226

Don AtwoodNaval Postgraduate School Workshop 9 August 1 Monitoring Marine Ecosystems  

E-Print Network [OSTI]

School Workshop ­ 9 August 9 NRT Support Walrus Tracking U.S. Fish and Wildlife Service USGS Alaska Environment U.S. Fish and Wildlife Service USGS Alaska Science Center #12;Don AtwoodNaval Postgraduate School Interactions Hurricane Ivan What does SAR see? · surface roughness of the water Fortunately, wind, atmospheric

227

Symposium on Naval Hydrodynamics Gothenburg, Sweden, 26-31 August 2012  

E-Print Network [OSTI]

29th Symposium on Naval Hydrodynamics Gothenburg, Sweden, 26-31 August 2012 High will be dramatically different from current mainstream supercomputers in terms of computing power and parallel are demonstrated for plunging breaking waves behind a bump using 2.2 billion grid points running on thousands

Yang, Jianming

228

Low Energy Nuclear Reaction Research at the Naval Research Laboratory D.A. Kidwell1  

E-Print Network [OSTI]

Low Energy Nuclear Reaction Research at the Naval Research Laboratory D.A. Kidwell1 , D have explored the field of Low Energy Nuclear Reactions (LENR) for about eight years focusing energy (as heat) is produced ­ neither nuclear products nor transmutations have been firmly established

Noble, James S.

229

Facility Safety  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The objective of this Order is to establish facility safety requirements related to: nuclear safety design, criticality safety, fire protection and natural phenomena hazards mitigation. The Order has Change 1 dated 11-16-95, Change 2 dated 10-24-96, and the latest Change 3 dated 11-22-00 incorporated. The latest change satisfies a commitment made to the Defense Nuclear Facilities Safety Board (DNFSB) in response to DNFSB recommendation 97-2, Criticality Safety.

2000-11-20T23:59:59.000Z

230

Facility Safety  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The order establishes facility and programmatic safety requirements for nuclear and explosives safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH) mitigation, and the System Engineer Program.Chg 1 incorporates the use of DOE-STD-1189-2008, Integration of Safety into the Design Process, mandatory for Hazard Category 1, 2 and 3 nuclear facilities. Cancels DOE O 420.1A.

2005-12-22T23:59:59.000Z

231

Facility Safety  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

DOE-STD-1104 contains the Department's method and criteria for reviewing and approving nuclear facility's documented safety analysis (DSA). This review and approval formally document the basis for DOE, concluding that a facility can be operated safely in a manner that adequately protects workers, the public, and the environment. Therefore, it is appropriate to formally require implementation of the review methodology and criteria contained in DOE-STD-1104.

2013-06-21T23:59:59.000Z

232

Advanced Materials Facilities & Capabilites | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Highlights Research Highlights Facilities and Capabilities Science to Energy Solutions News & Awards Events and Conferences Supporting Organizations Advanced Materials Home | Science & Discovery | Advanced Materials | Facilities and Capabilities SHARE Facilities and Capabilities ORNL has resources that together provide a unique environment for Advanced Materials Researchers. ORNL hosts two of the most advanced neutron research facilities in the world, the Spallation Neutron Source (SNS) and the High Flux Isotope Reactor (HFIR). In addition, the Center for Nanophase Materials Sciences offers world-class capabilities and expertise for nanofabrication, scanning probe microscopy, chemical and laser synthesis, spectroscopy, and computational modeling and their. The ORNL

233

Gas Test Loop Facilities Alternatives Assessment Report Rev 1  

SciTech Connect (OSTI)

An important task in the Gas Test Loop (GTL) conceptual design was to determine the best facility to serve as host for this apparatus, which will allow fast-flux neutron testing in an existing nuclear facility. A survey was undertaken of domestic and foreign nuclear reactors and accelerator facilities to arrive at that determination. Two major research reactors in the U.S. were considered in detail, the Advanced Test Reactor (ATR) and the High Flux Isotope Reactor (HFIR), each with sufficient power to attain the required neutron fluxes. HFIR routinely operates near its design power limit of 100 MW. ATR has traditionally operated at less than half its design power limit of 250 MW. Both of these reactors should be available for at least the next 30 years. The other major U.S. research reactor, the Missouri University Research Reactor, does not have sufficient power to reach the required neutron flux nor do the smaller research reactors. Of the foreign reactors investigated, BOR-60 is perhaps the most attractive. Monju and BN 600 are power reactors for their respective electrical grids. Although the Joyo reactor is vigorously campaigning for customers, local laws regarding transport of radioactive material mean it would be very difficult to retrieve test articles from either Japanese reactor for post irradiation examination. PHENIX is scheduled to close in 2008 and is fully booked until then. FBTR is limited to domestic (Indian) users only. Data quality is often suspect in Russia. The only accelerator seriously considered was the Fuel and Material Test Station (FMTS) currently proposed for operation at Los Alamos National Laboratory. The neutron spectrum in FMTS is similar to that found in a fast reactor, but it has a pronounced high-energy tail that is atypical of fast fission reactor spectra. First irradiation in the FMTS is being contemplated for 2008. Detailed review of these facilities resulted in the recommendation that the ATR would be the best host for the GTL.

William J. Skerjanc; William F. Skerjanc

2005-07-01T23:59:59.000Z

234

X-10 Graphite Reactor | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

X-10 Graphite Reactor X-10 Graphite Reactor X-10 Graphite Reactor X-10 Graphite Reactor When President Roosevelt in December 1942 authorized the Manhattan Project, the Oak Ridge site in eastern Tennessee had already been obtained and plans laid for an air-cooled experimental pile, a pilot chemical separation plant, and support facilities. The X-10 Graphite Reactor, designed and built in ten months, went into operation on November 4, 1943. The X-10 used neutrons emitted in the fission of uranium-235 to convert uranium-238 into a new element, plutonium-239. The reactor consists of a huge block of graphite, measuring 24 feet on each side, surrounded by several feet of high-density concrete as a radiation shield. The block is pierced by 1,248 horizontal diamond-shaped channels in

235

HYTEST Phase I Facility Commissioning and Modeling  

SciTech Connect (OSTI)

The purpose of this document is to report the first year accomplishments of two coordinated Laboratory Directed Research and Development (LDRD) projects that utilize a hybrid energy testing laboratory that couples various reactors to investigate system reactance behavior. This work is the first phase of a series of hybrid energy research and testing stations - referred to hereafter as HYTEST facilities – that are planned for construction and operation at the Idaho National Laboratory (INL). A HYTEST Phase I facility was set up and commissioned in Bay 9 of the Bonneville County Technology Center (BCTC). The purpose of this facility is to utilize the hydrogen and oxygen that is produced by the High Temperature Steam Electrolysis test reactors operating in Bay 9 to support the investigation of kinetic phenomena and transient response of integrated reactor components. This facility provides a convenient scale for conducting scoping tests of new reaction concepts, materials performance, new instruments, and real-time data collection and manipulation for advance process controls. An enclosed reactor module was assembled and connected to a new ventilation system equipped with a variable-speed exhaust blower to mitigate hazardous gas exposures, as well as contract with hot surfaces. The module was equipped with a hydrogen gas pump and receiver tank to supply high quality hydrogen to chemical reactors located in the hood.

Lee P. Shunn; Richard D. Boardman; Shane J. Cherry; Craig G. Rieger

2009-09-01T23:59:59.000Z

236

Facility Operations 1993 fiscal year work plan: WBS 1.3.1  

SciTech Connect (OSTI)

The Facility Operations program is responsible for the safe, secure, and environmentally sound management of several former defense nuclear production facilities, and for the nuclear materials in those facilities. As the mission for Facility Operations plants has shifted from production to support of environmental restoration, each plant is making a transition to support the new mission. The facilities include: K Basins (N Reactor fuel storage); N Reactor; Plutonium-Uranium Reduction Extraction (PUREX) Plant; Uranium Oxide (UO{sub 3}) Plant; 300 Area Fuels Supply (N Reactor fuel supply); Plutonium Finishing Plant (PFP).

Not Available

1992-11-01T23:59:59.000Z

237

Research reactors - an overview  

SciTech Connect (OSTI)

A broad overview of different types of research and type reactors is provided in this paper. Reactor designs and operating conditions are briefly described for four reactors. The reactor types described include swimming pool reactors, the High Flux Isotope Reactor, the Mark I TRIGA reactor, and the Advanced Neutron Source reactor. Emphasis in the descriptions is placed on safety-related features of the reactors. 7 refs., 7 figs., 2 tabs.

West, C.D.

1997-03-01T23:59:59.000Z

238

Improved Design of Nuclear Reactor Control System | U.S. DOE...  

Office of Science (SC) Website

instrumentation: Improved Design of Nuclear Reactor Control System Developed at: Oak Ridge National Laboratory, Holifield Radioactive Ion Beam Facility (HRIBF) Developed...

239

Facility Safety  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

Establishes facility safety requirements related to: nuclear safety design, criticality safety, fire protection and natural phenomena hazards mitigation. Cancels DOE 5480.7A, DOE 5480.24, DOE 5480.28 and Division 13 of DOE 6430.1A. Canceled by DOE O 420.1A.

1995-10-13T23:59:59.000Z

240

Facility Safety  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order establishes facility and programmatic safety requirements for DOE and NNSA for nuclear safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH) mitigation, and System Engineer Program. Cancels DOE O 420.1B, DOE G 420.1-2 and DOE G 420.1-3.

2012-12-04T23:59:59.000Z

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

Light Water Reactor Sustainability  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 Light Water Reactor Sustainability ACCOMPLISHMENTS REPORT 2014 Accomplishments Report | Light Water Reactor Sustainability 2 T he mission of the Light Water Reactor...

242

"The Fourth Dimension of Naval Tactics": The U.S. Navy and Public Relations, 1919-1939  

E-Print Network [OSTI]

Prior to 1917, the United States Navy only utilized public relations techniques during times of war or to attract recruits into naval service. Following World I, the Navy confronted several daunting problems, including the postwar demobilization...

Wadle, Ryan David

2012-07-16T23:59:59.000Z

243

Natural Convection Shutdown Heat Removal Test Facility (NSTF)  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Natural Convection Natural Convection Shutdown Heat Removal Test Facility Scaling Basis Full Scale Half Scale NSTF Argonne National Laboratory's Natural Convection Shutdown Heat Removal Test Facility (NSTF) - one of the world's largest facilities for ex-vessel passive decay heat removal testing-confirms the performance of reactor cavity cooling systems (RCCS) and similar passive confinement or containment decay heat removal systems in modern Small Modular Reactors. Originally built to aid in the development of General Electric's Power Reactor Innovative Small Module (PRISM) Reactor Vessel Auxiliary Cooling System (RVACS), the NSTF has a long history of providing confirmatory data for the airside of the RVACS. Argonne National Laboratory's NSTF is a state-of-the-art, large-scale facility for evaluating performance

244

New PTB thermal neutron calibration facility: first results  

Science Journals Connector (OSTI)

......physikalisch-technische bundesanstalt (PTB) operated for almost 10 y an installation at the research reactor of the GKSS in Geesthacht/Germany for irradiations with thermal neutrons. After its shutdown in 2008, no thermal neutron calibration facility was......

M. Luszik-Bhadra; M. Reginatto; H. Wershofen; B. Wiegel; A. Zimbal

2014-10-01T23:59:59.000Z

245

DOE - Office of Legacy Management -- Naval Ordnance Plant - MI 0-03  

Office of Legacy Management (LM)

Plant - MI 0-03 Plant - MI 0-03 FUSRAP Considered Sites Site: NAVAL ORDNANCE PLANT (MI.0-03) Eliminated from further consideration under FUSRAP - Referred to DoD for action Designated Name: Not Designated Alternate Name: None Location: Centerline , Michigan MI.0-03-1 Evaluation Year: 1987 MI.0-03-1 Site Operations: Assembled bomb components. MI.0-03-1 Site Disposition: Eliminated - No Authority - Referred to DoD MI.0-03-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP - Referred to DoD for action MI.0-03-1 Also see Documents Related to NAVAL ORDNANCE PLANT MI.0-03-1 - DOE Letter; J.Fiore to C.Shafer; Subject: Information on

246

DOE - Office of Legacy Management -- Naval Proving Ground - VA 0-01  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Proving Ground - VA 0-01 Proving Ground - VA 0-01 FUSRAP Considered Sites Site: NAVAL PROVING GROUND (VA.0-01 ) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Dahlgren , Virginia VA.0-01-1 Evaluation Year: 1987 VA.0-01-1 Site Operations: Site operations were not specified; this site was identified on the 1954 Accountable Station Lists. VA.0-01-1 VA.0-01-2 Site Disposition: Eliminated - Referred to DOD VA.0-01-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP - Referred to DOD VA.0-01-1 Also see Documents Related to NAVAL PROVING GROUND VA.0-01-1 - DOE Letter; Fiore to Schafer; Referral of DOD or Former

247

DOE - Office of Legacy Management -- Naval Ordnance Laboratory - MD 0-03  

Office of Legacy Management (LM)

Ordnance Laboratory - MD 0-03 Ordnance Laboratory - MD 0-03 FUSRAP Considered Sites Site: NAVAL ORDNANCE LABORATORY (MD.0-03 ) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: Naval Ordnance Laboratory - White Oak Location: White Oak Area , Silver Spring , Maryland MD.0-03-1 MD.0-03-2 Evaluation Year: 1987 MD.0-03-2 Site Operations: Research and development - may have involved radioactive materials because the site was identified on a 1955 Accountability Station List. MD.0-03-1 Site Disposition: Eliminated - NRC licensed MD.0-03-2 Radioactive Materials Handled: None Specifically Identified Primary Radioactive Materials Handled: None specifically indicated Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP - Referred to DOD MD.0-03-2

248

Success Story: Naval Medical Center San Diego Co-Generation Project  

Broader source: Energy.gov (indexed) [DOE]

Success Story Success Story Success Story Naval Medical Center San Diego Naval Medical Center San Diego Co-Generation Project Co-Generation Project Karen Jackson, SDG&E Karen Jackson, SDG&E Project Manager Project Manager Edward Thibodo, NAVFAC SW Edward Thibodo, NAVFAC SW Energy Team Contract Energy Team Contract ' ' s Lead s Lead NAVFAC Contractor NAVFAC Contractor ' ' s Guide: s Guide:   Partnering Philosophy Partnering Philosophy - - " " We W are partners e are partners in every contract we award. Partnering is in every contract we award. Partnering is an attitude that we both work hard to an attitude that we both work hard to develop, an it requires both of us to take develop, an it requires both of us to take some extra risk and trust one another. some extra risk and trust one another.

249

DOE - Office of Legacy Management -- Naval Office at the University of New  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Office at the University of Office at the University of New Mexico - NM 0-03 FUSRAP Considered Sites Site: NAVAL OFFICE AT THE UNIVERSITY OF NEW MEXICO (NM.0-03) Eliminated from further consideration under FUSRAP - Referred to DOD Designated Name: Not Designated Alternate Name: None Location: Albuquerque , New Mexico NM.0-03-1 Evaluation Year: 1987 NM.0-03-1 Site Operations: Site was a transshipment station for equipment to the Los Alamos site. NM.0-03-1 Site Disposition: Eliminated - Referred to DOD NM.0-03-1 Radioactive Materials Handled: None Indicated Primary Radioactive Materials Handled: None NM.0-03-1 Radiological Survey(s): None Indicated Site Status: Eliminated from further consideration under FUSRAP - Referred to DOD NM.0-03-1 Also see Documents Related to NAVAL OFFICE AT THE UNIVERSITY OF NEW MEXICO

250

Advanced Safeguards Approaches for New Fast Reactors  

SciTech Connect (OSTI)

This third report in the series reviews possible safeguards approaches for new fast reactors in general, and the ABR in particular. Fast-neutron spectrum reactors have been used since the early 1960s on an experimental and developmental level, generally with fertile blanket fuels to “breed” nuclear fuel such as plutonium. Whether the reactor is designed to breed plutonium, or transmute and “burn” actinides depends mainly on the design of the reactor neutron reflector and the whether the blanket fuel is “fertile” or suitable for transmutation. However, the safeguards issues are very similar, since they pertain mainly to the receipt, shipment and storage of fresh and spent plutonium and actinide-bearing “TRU”-fuel. For these reasons, the design of existing fast reactors and details concerning how they have been safeguarded were studied in developing advanced safeguards approaches for the new fast reactors. In this regard, the design of the Experimental Breeder Reactor-II “EBR-II” at the Idaho National Laboratory (INL) was of interest, because it was designed as a collocated fast reactor with a pyrometallurgical reprocessing and fuel fabrication line – a design option being considered for the ABR. Similarly, the design of the Fast Flux Facility (FFTF) on the Hanford Site was studied, because it was a successful prototype fast reactor that ran for two decades to evaluate fuels and the design for commercial-scale fast reactors.

Durst, Philip C.; Therios, Ike; Bean, Robert; Dougan, A.; Boyer, Brian; Wallace, Rick L.; Ehinger, Michael H.; Kovacic, Don N.; Tolk, K.

2007-12-15T23:59:59.000Z

251

Catalytic reactor  

DOE Patents [OSTI]

A catalytic reactor is provided with one or more reaction zones each formed of set(s) of reaction tubes containing a catalyst to promote chemical reaction within a feed stream. The reaction tubes are of helical configuration and are arranged in a substantially coaxial relationship to form a coil-like structure. Heat exchangers and steam generators can be formed by similar tube arrangements. In such manner, the reaction zone(s) and hence, the reactor is compact and the pressure drop through components is minimized. The resultant compact form has improved heat transfer characteristics and is far easier to thermally insulate than prior art compact reactor designs. Various chemical reactions are contemplated within such coil-like structures such that as steam methane reforming followed by water-gas shift. The coil-like structures can be housed within annular chambers of a cylindrical housing that also provide flow paths for various heat exchange fluids to heat and cool components.

Aaron, Timothy Mark (East Amherst, NY); Shah, Minish Mahendra (East Amherst, NY); Jibb, Richard John (Amherst, NY)

2009-03-10T23:59:59.000Z

252

U.S. Department of Energy Naval Petroleum and Oil Shale Reserves combined financial statements, September 30, 1996 and 1995  

SciTech Connect (OSTI)

The Naval Petroleum and Oil Shale Reserves (NPOSR) produces crude oil and associated hydrocarbons from the Naval Petroleum Reserves (NPR) numbered 1, 2, and 3, and the Naval Oil Shale Reserves (NOSR) numbered 1, 2, and 3 in a manner to achieve the greatest value and benefits to the US taxpayer. NPOSR consists of the Naval Petroleum Reserve in California (NPRC or Elk Hills), which is responsible for operations of NPR-1 and NPR-2; the Naval Petroleum Oil Shale Reserve in Colorado, Utah, and Wyoming (NPOSR-CUW), which is responsible for operations of NPR-3, NOSR-1, 2, and 3 and the Rocky Mountain Oilfield Testing Center (RMOTC); and NPOSR Headquarters in Washington, DC, which is responsible for overall program direction. Each participant shares in the unit costs and production of hydrocarbons in proportion to the weighted acre-feet of commercially productive oil and gas formations (zones) underlying the respective surface lands as of 1942. The participating shares of NPR-1 as of September 30, 1996 for the US Government and Chevron USA, Inc., are listed. This report presents the results of the independent certified public accountants` audit of the Department of Energy`s (Department) Naval Petroleum and Oil Shale Reserves (NPOSR) financial statements as of September 30, 1996.

NONE

1997-03-01T23:59:59.000Z

253

Zircaloy performance in light water reactors  

SciTech Connect (OSTI)

Zircaloy has been successfully used as the primary light water reactor (LWR) core structural material since its introduction in the early days of the US naval nuclear program. Its unique combination of low neutron absorption cross section, fabricability, mechanical strength, and corrosion resistance in water and steam near 300{degrees}C has resulted in remarkable reliability of operation of pressurized and boiling water reactor (PWR, BWR) fuel through the years. At present time, BWRs use Zircaloy-2 and PWRs use Zircaloy-4 for fuel cladding. In BWRs, both Zircaloy-2 and -4 have been successfully used for spacer grids and channels, and in PWRs Zircaloy-4 is used for spacer grids and control rod guide tubes. Performance of fuel rods has been excellent thus far. The current trend for utilities worldwide is to expect both higher fuel reliability in the future. Fuel suppliers have already achieved extended exposures in lead use assemblies, and have demonstrated excellent performance in all areas; therefore unsuspected problems are not likely to arise. However, as exposure and expectations continue to increase, Zircaloy is being taken toward the limits of its known capabilities. This paper reviews Zircaloy performance capabilities in areas related to environmentally affected microstructure, mechanical properties, corrosion resistance, and dimensional stability. The effects of radiation and reactor environment on each property is illustrated with data, micrographs, and analysis.

Adamson, R.B.; Cheng, B.C.; Kruger, R.M. [GE Nuclear Energy, Pleasanton, CA (United States)

1992-12-31T23:59:59.000Z

254

Personnel Selection, Qualification, and Training Requirements for DOE Nuclear Facilities  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To establish selection, qualification, and training requirements for management and operating (M&O) contractor personnel involved in the operation, maintenance, and technical support of Department of Energy and National Nuclear Security Administration Category A and B reactors and non-reactor nuclear facilities. Canceled by DOE O 426.2

2001-07-12T23:59:59.000Z

255

SGP Central Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Central Facility Central Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Central Facility The ARM Climate Research Facility deploys specialized remote sensing instruments in a fixed location at the site to gather atmospheric data of unprecedented quality, consistency, and completeness. More than 30 instrument clusters have been placed around the site; the central facility; and the boundary, intermediate, and extended facilities. The locations for the instruments were chosen so that the measurements reflect conditions

256

ARM - SGP Central Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Central Facility Central Facility SGP Related Links Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration Facility Geographic Information ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Fact Sheet Images Information for Guest Scientists Contacts SGP Central Facility The ARM Climate Research Facility deploys specialized remote sensing instruments in a fixed location at the site to gather atmospheric data of unprecedented quality, consistency, and completeness. More than 30 instrument clusters have been placed around the site; the central facility; and the boundary, intermediate, and extended facilities. The locations for the instruments were chosen so that the measurements reflect conditions

257

Managerial Aspects of BNCT at a Nuclear Research Reactor  

Science Journals Connector (OSTI)

All BNCT facilities worldwide, performing clinical trials, are presently located at a nuclear research reactor. They are nevertheless, to all ... 43/EURATOM which stipulates that radiotherapy quality assurance programmes

Wolfgang A. G. Sauerwein; Ray Moss

2012-01-01T23:59:59.000Z

258

NREL: Energy Systems Integration Facility - Facility Design  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facility Design Throughout the Energy Systems Integration Facility design process, the National Renewable Energy Laboratory hosted workshops in which stakeholders from across the...

259

Recovery of Information from the Fast Flux Test Facility for the Advanced Fuel Cycle Initiative  

SciTech Connect (OSTI)

The Fast Flux Test Facility is the most recent Liquid Metal Reactor to operate in the United States. Information from the design, construction, and operation of this reactor was at risk as the facilities associated with the reactor are being shut down. The Advanced Fuel Cycle Initiative is a program managed by the Office of Nuclear Energy of the U.S. Department of Energy with a mission to develop new fuel cycle technologies to support both current and advanced reactors. Securing and preserving the knowledge gained from operation and testing in the Fast Flux Test Facility is an important part of the Knowledge Preservation activity in this program.

Nielsen, Deborah L.; Makenas, Bruce J.; Wootan, David W.; Butner, R. Scott; Omberg, Ronald P.

2009-09-30T23:59:59.000Z

260

EIS-0251: Department of the Navy Final Environmental Impact Statement for a Container System for the Management of Naval Spent Nuclear Fuel (November 1996)  

Broader source: Energy.gov [DOE]

This Final Environmental Impact Statement addresses six general alternative systems for the loading, storage, transport, and possible disposal of naval spent nuclear fuel following examination.

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Evaluation of existing United States` facilities for use as a mixed-oxide (MOX) fuel fabrication facility for plutonium disposition  

SciTech Connect (OSTI)

A number of existing US facilities were evaluated for use as a mixed-oxide fuel fabrication facility for plutonium disposition. These facilities include the Fuels Material Examination Facility (FMEF) at Hanford, the Washington Power Supply Unit 1 (WNP-1) facility at Hanford, the Barnwell Nuclear Fuel Plant (BNFP) at Barnwell, SC, the Fuel Processing Facility (FPF) at Idaho National Engineering Laboratory (INEL), the Device Assembly Facility (DAF) at the Nevada Test Site (NTS), and the P-reactor at the Savannah River Site (SRS). The study consisted of evaluating each facility in terms of available process space, available building support systems (i.e., HVAC, security systems, existing process equipment, etc.), available regional infrastructure (i.e., emergency response teams, protective force teams, available transportation routes, etc.), and ability to integrate the MOX fabrication process into the facility in an operationally-sound manner that requires a minimum amount of structural modifications.

Beard, C.A.; Buksa, J.J.; Chidester, K.; Eaton, S.L.; Motley, F.E.; Siebe, D.A.

1995-12-31T23:59:59.000Z

262

4858 recreation facility [n  

Science Journals Connector (OSTI)

plan. recr. (Installation and equipment provided for recreation; ? simply-provided recreation facility , ? well-provided recreation facility ...

2010-01-01T23:59:59.000Z

263

Facilities | Argonne National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Engineering Research Facility Distributed Energy Research Center Engine Research Facility Heat Transfer Laboratory Tribology Laboratory Transportation Beamline at the Advanced...

264

Light Water Reactors Technology Development - Nuclear Reactors  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Light Water Reactors Light Water Reactors About Director's Welcome Organization Achievements Highlights Fact Sheets, Brochures & Other Documents Multimedia Library Visit Argonne Work with Argonne Contact us Nuclear Energy Why Nuclear Energy? Why are some people afraid of Nuclear Energy? How do nuclear reactors work? Cheaper & Safer Nuclear Energy Helping to Solve the Nuclear Waste Problem Nuclear Reactors Nuclear Reactors Early Exploration Training Reactors Basic and Applied Science Research LWR Technology Development BORAX-III lighting Arco, Idaho (Press Release) Heavy Water and Graphite Reactors Fast Reactor Technology Integral Fast Reactor Argonne Reactor Tree CP-1 70th Anniversary CP-1 70th Anniversary Argonne's Nuclear Science and Technology Legacy Argonne's Nuclear Science and Technology Legacy

265

Facility Representatives  

Broader source: Energy.gov (indexed) [DOE]

063-2011 063-2011 February 2011 Superseding DOE-STD-1063-2006 April 2006 DOE STANDARD FACILITY REPRESENTATIVES U.S. Department of Energy AREA MGMT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE DOE-STD-1063-2011 ii Available on the Department of Energy Technical Standards Program Web site at http://www.hss.doe.gov/nuclearsafety/ns/techstds/ DOE-STD-1063-2011 iii FOREWORD 1. This Department of Energy (DOE) standard is approved for use by all DOE/National Nuclear Security Administration (NNSA) Components. 2. The revision to this DOE standard was developed by a working group consisting of headquarters and field participants. Beneficial comments (recommendations,

266

Facility Representatives  

Broader source: Energy.gov (indexed) [DOE]

DOE-STD-1063-2006 April 2006 Superseding DOE-STD-1063-2000 March 2000 DOE STANDARD FACILITY REPRESENTATIVES U.S. Department of Energy AREA MGMT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE DOE-STD-1063-2006 ii Available on the Department of Energy Technical Standards Program web site at http://www.eh.doe.gov/techstds/ DOE-STD-1063-2006 iii FOREWORD 1. This Department of Energy standard is approved for use by all DOE Components. 2. The revision to this DOE standard was developed by a working group consisting of headquarters and field participants. Beneficial comments (recommendations, additions, deletions) and any pertinent data that may improve this document should

267

Facility Type!  

Office of Legacy Management (LM)

ITY: ITY: --&L~ ----------- srct-r~ -----------~------~------- if yee, date contacted ------------- cl Facility Type! i I 0 Theoretical Studies Cl Sample 84 Analysis ] Production 1 Diepasal/Storage 'YPE OF CONTRACT .--------------- 1 Prime J Subcontract&- 1 Purchase Order rl i '1 ! Other information (i.e., ---------~---~--~-------- :ontrait/Pirchaee Order # , I C -qXlJ- --~-------~~-------~~~~~~ I I ~~~---~~~~~~~T~~~ FONTRACTING PERIODi IWNERSHIP: ,I 1 AECIMED AECMED GOVT GOUT &NTtiAC+OR GUN-I OWNED ----- LEEE!? M!s LE!Ps2 -LdJG?- ---L .ANDS ILJILDINGS X2UIPilENT IRE OR RAW HA-I-L :INAL PRODUCT IASTE Z. RESIDUE I I kility l pt I ,-- 7- ,+- &!d,, ' IN&"E~:EW AT SITE -' ---------------- , . Control 0 AEC/tlED managed operations

268

Research Facility,  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Collecting and Delivering the Data Collecting and Delivering the Data As a general condition for use of the ARM Climate Research Facility, users are required to include their data in the ARM Data Archive. All data acquired must be of sufficient quality to be useful and must be documented such that users will be able to clearly understand the meaning and organization of the data. Final, quality-assured data sets are stored in the Data Archive and are freely accessible to the general scientific community. Preliminary data may be shared among field campaign participants during and shortly following the campaign. To facilitate sharing of preliminary data, the ARM Data Archive establishes restricted access capability, limited to participants and data managers.

269

Naval Petroleum and Oil Shale Reserves. Annual report of operations, Fiscal year 1993  

SciTech Connect (OSTI)

During fiscal year 1993, the reserves generated $440 million in revenues, a $33 million decrease from the fiscal year 1992 revenues, primarily due to significant decreases in oil and natural gas prices. Total costs were $207 million, resulting in net cash flow of $233 million, compared with $273 million in fiscal year 1992. From 1976 through fiscal year 1993, the Naval Petroleum and Oil Shale Reserves generated $15.7 billion in revenues for the US Treasury, with expenses of $2.9 billion. The net revenues of $12.8 billion represent a return on costs of 441 percent. See figures 2, 3, and 4. In fiscal year 1993, production at the Naval Petroleum and Oil Shale Reserves at maximum efficient rates yielded 25 million barrels of crude oil, 123 billion cubic feet of natural gas, and 158 million gallons of natural gas liquids. The Naval Petroleum and Oil Shale Reserves has embarked on an effort to identify additional hydrocarbon resources on the reserves for future production. In 1993, in cooperation with the US Geological Survey, the Department initiated a project to assess the oil and gas potential of the program`s oil shale reserves, which remain largely unexplored. These reserves, which total a land area of more than 145,000 acres and are located in Colorado and Utah, are favorably situated in oil and gas producing regions and are likely to contain significant hydrocarbon deposits. Alternatively the producing assets may be sold or leased if that will produce the most value. This task will continue through the first quarter of fiscal year 1994.

Not Available

1993-12-31T23:59:59.000Z

270

Rocky Mountain Oilfield Testing Center RMOTC at the Naval Petroleum Reserve No. 3  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

RMOTC RMOTC The Rocky Mountain Oilfield Testing Center (RMOTC), is an operating oil field focusing on environmentally-balanced energy technologies and alternatives, and is the premiere energy testing and demonstration field in the nation. 3 3 * the opportunity to explore environmentally- balanced solutions to the nation's energy issues * opportunities to develop, demonstrate, and evaluate a variety of energy related technologies * a chance to collaborate with top professionals in the energy, environmental technology, and engineering fields * shared industry knowledge through technology transfer via reports, journal articles, and presentations Located within the Naval Petroleum Reserve No. 3 (NPR-3) near Casper, Wyoming, RMOTC offers: RMOTC Offers Solutions 4 4 The Administration and Engineering

271

Photocatalytic reactor  

DOE Patents [OSTI]

A photocatalytic reactor is described for processing selected reactants from a fluid medium comprising at least one permeable photocatalytic membrane having a photocatalytic material. The material forms an area of chemically active sites when illuminated by light at selected wavelengths. When the fluid medium is passed through the illuminated membrane, the reactants are processed at these sites separating the processed fluid from the unprocessed fluid. A light source is provided and a light transmitting means, including an optical fiber, for transmitting light from the light source to the membrane. 4 figs.

Bischoff, B.L.; Fain, D.E.; Stockdale, J.A.D.

1999-01-19T23:59:59.000Z

272

Harrisburg Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Harrisburg Facility Biomass Facility Harrisburg Facility Biomass Facility Jump to: navigation, search Name Harrisburg Facility Biomass Facility Facility Harrisburg Facility Sector Biomass Facility Type Landfill Gas Location Dauphin County, Pennsylvania Coordinates 40.2734277°, -76.7336521° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.2734277,"lon":-76.7336521,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

273

Brookhaven Facility Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Brookhaven Facility Biomass Facility Brookhaven Facility Biomass Facility Jump to: navigation, search Name Brookhaven Facility Biomass Facility Facility Brookhaven Facility Sector Biomass Facility Type Landfill Gas Location Suffolk County, New York Coordinates 40.9848784°, -72.6151169° Loading map... {"minzoom":false,"mappingservice":"googlemaps3","type":"ROADMAP","zoom":14,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"geoservice":"google","maxzoom":false,"width":"600px","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"wmsoverlay":"","layers":[],"controls":["pan","zoom","type","scale","streetview"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"kml":[],"gkml":[],"fusiontables":[],"resizable":false,"tilt":0,"kmlrezoom":false,"poi":true,"imageoverlays":[],"markercluster":false,"searchmarkers":"","locations":[{"text":"","title":"","link":null,"lat":40.9848784,"lon":-72.6151169,"alt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":""}]}

274

CRAD, Training - Oak Ridge National Laboratory High Flux Isotope Reactor |  

Broader source: Energy.gov (indexed) [DOE]

Reactor Reactor CRAD, Training - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Training Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor. RADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Training - Oak Ridge National Laboratory High Flux Isotope Reactor More Documents & Publications CRAD, Nuclear Safety - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Training - Oak Ridge National Laboratory High Flux Isotope Reactor

275

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor  

Broader source: Energy.gov (indexed) [DOE]

Reactor Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor More Documents & Publications CRAD, Safety Basis - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor

276

Hybrid adsorptive membrane reactor  

DOE Patents [OSTI]

A hybrid adsorbent-membrane reactor in which the chemical reaction, membrane separation, and product adsorption are coupled. Also disclosed are a dual-reactor apparatus and a process using the reactor or the apparatus.

Tsotsis, Theodore T. (Huntington Beach, CA); Sahimi, Muhammad (Altadena, CA); Fayyaz-Najafi, Babak (Richmond, CA); Harale, Aadesh (Los Angeles, CA); Park, Byoung-Gi (Yeosu, KR); Liu, Paul K. T. (Lafayette Hill, PA)

2011-03-01T23:59:59.000Z

277

Design of a 25-kWe Surface Reactor System Based on SNAP Reactor Technologies  

SciTech Connect (OSTI)

A Hastelloy-X clad, sodium-potassium (NaK-78) cooled, moderated spectrum reactor using uranium zirconium hydride (UZrH) fuel based on the SNAP program reactors is a promising design for use in surface power systems. This paper presents a 98 kWth reactor for a power system the uses multiple Stirling engines to produce 25 kWe-net for 5 years. The design utilizes a pin type geometry containing UZrHx fuel clad with Hastelloy-X and NaK-78 flowing around the pins as coolant. A compelling feature of this design is its use of 49.9% enriched U, allowing it to be classified as a category III-D attractiveness and reducing facility costs relative to highly-enriched space reactor concepts. Presented below are both the design and an analysis of this reactor's criticality under various safety and operations scenarios.

Dixon, David D. [Nuclear Systems Design Group, Los Alamos National Laboratory, Los Alamos, NM 87545 (United States); Department of Nuclear Engineering, North Carolina State University, Raleigh, NC 27695 (United States); Hiatt, Matthew T. [Nuclear Systems Design Group, Los Alamos National Laboratory, Los Alamos, NM 87545 (United States); Department of Nuclear Engineering, Texas A and M University, College Station, TX 77843 (United States); Poston, David I.; Kapernick, Richard J. [Nuclear Systems Design Group, Los Alamos National Laboratory, Los Alamos, NM 87545 (United States)

2006-01-20T23:59:59.000Z

278

International Facility Management Association Strategic Facility  

Broader source: Energy.gov (indexed) [DOE]

Facility Management Association Facility Management Association Strategic Facility Planning: A WhIte PAPer Strategic Facility Planning: A White Paper on Strategic Facility Planning © 2009 | International Facility Management Association For additional information, contact: 1 e. Greenway Plaza, Suite 1100 houston, tX 77046-0104 USA P: + 1-713-623-4362 F: + 1-713-623-6124 www.ifma.org taBle OF cOntentS PreFace ......................................................... 2 executive Summary .................................... 3 Overview ....................................................... 4 DeFinitiOn OF Strategic Facility Planning within the Overall cOntext OF Facility Planning ................. 5 SPecializeD analySeS ................................ 9 OrganizatiOnal aPPrOacheS tO SFP ... 10 the SFP PrOceSS .......................................

279

GEN-IV Reactors  

Science Journals Connector (OSTI)

Generation-IV reactors are a set of nuclear reactors currently being developed under international collaborations targeting ... economics, proliferation resistance, and physical protection of nuclear energy. Nuclear

Taek K. Kim

2013-01-01T23:59:59.000Z

280

The Netherlands Reactor Centre  

Science Journals Connector (OSTI)

... Two illustrated brochures in English have recently J. been issued by the Netherlands Reactor Centre ( ... Centre (Reactor Centrum Nederland). The first* gives a general survey of the ...

S. WEINTROUB

1964-04-04T23:59:59.000Z

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

E AREA LOW LEVEL WASTE FACILITY DOE 435.1 PERFORMANCE ASSESSMENT  

SciTech Connect (OSTI)

This Performance Assessment for the Savannah River Site E-Area Low-Level Waste Facility was prepared to meet requirements of Chapter IV of the Department of Energy Order 435.1-1. The Order specifies that a Performance Assessment should provide reasonable assurance that a low-level waste disposal facility will comply with the performance objectives of the Order. The Order also requires assessments of impacts to water resources and to hypothetical inadvertent intruders for purposes of establishing limits on radionuclides that may be disposed near-surface. According to the Order, calculations of potential doses and releases from the facility should address a 1,000-year period after facility closure. The point of compliance for the performance measures relevant to the all pathways and air pathway performance objective, as well as to the impact on water resources assessment requirement, must correspond to the point of highest projected dose or concentration beyond a 100-m buffer zone surrounding the disposed waste following the assumed end of active institutional controls 100 years after facility closure. During the operational and institutional control periods, the point of compliance for the all pathways and air pathway performance measures is the SRS boundary. However, for the water resources impact assessment, the point of compliance remains the point of highest projected dose or concentration beyond a 100-m buffer zone surrounding the disposed waste during the operational and institutional control periods. For performance measures relevant to radon and inadvertent intruders, the points of compliance are the disposal facility surface for all time periods and the disposal facility after the assumed loss of active institutional controls 100 years after facility closure, respectively. The E-Area Low-Level Waste Facility is located in the central region of the SRS known as the General Separations Area. It is an elbow-shaped, cleared area, which curves to the northwest, situated immediately north of the Mixed Waste Management Facility. The E-Area Low-Level Waste Facility is comprised of 200 acres for waste disposal and a surrounding buffer zone that extends out to the 100-m point of compliance. Disposal units within the footprint of the low-level waste facilities include the Slit Trenches, Engineered Trenches, Component-in-Grout Trenches, the Low-Activity Waste Vault, the Intermediate-Level Vault, and the Naval Reactor Component Disposal Area. Radiological waste disposal operations at the E-Area Low-Level Waste Facility began in 1994. E-Area Low-Level Waste Facility closure will be conducted in three phases: operational closure, interim closure, and final closure. Operational closure will be conducted during the 25-year operation period (30-year period for Slit and Engineered Trenches) as disposal units are filled; interim closure measures will be taken for some units. Interim closure will take place following the end of operations and will consist of an area-wide runoff cover along with additional grading over the trench units. Final closure of all disposal units in the E-Area Low-Level Waste Facility will take place at the end of the 100-year institutional control period and will consist of the installation of an integrated closure system designed to minimize moisture contact with the waste and to serve as a deterrent to intruders. Radiological dose to human receptors is analyzed in this PA in the all-pathways analysis, the inadvertent intruder analysis and the air pathway analysis, and the results are compared to the relevant performance measures. For the all-pathways analysis, the performance measure of relevance is a 25-mrem/yr EDE to representative members of the public, excluding dose from radon and its progeny in air. For the inadvertent intruder, the applicable performance measures are 100-mrem/yr EDE and 500 mrem/yr EDE for chronic and exposure scenarios, respectively. The relevant performance measure for the air pathway is 10-mrem/yr EDE via the air pathway, excluding dose from radon and its progeny in air. Protecti

Wilhite, E

2008-03-31T23:59:59.000Z

282

Hot Fuel Examination Facility/South  

SciTech Connect (OSTI)

This document describes the potential environmental impacts associated with proposed modifications to the Hot Fuel Examination Facility/South (HFEF/S). The proposed action, to modify the existing HFEF/S at the Argonne National Laboratory-West (ANL-W) on the Idaho National Engineering Laboratory (INEL) in southeastern Idaho, would allow important aspects of the Integral Fast Reactor (IFR) concept, offering potential advantages in nuclear safety and economics, to be demonstrated. It would support fuel cycle experiments and would supply fresh fuel to the Experimental Breeder Reactor-II (EBR-II) at the INEL. 35 refs., 12 figs., 13 tabs.

Not Available

1990-05-01T23:59:59.000Z

283

INL User Facility welcomes three new experiments | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

INL User Facility welcomes three new experiments INL User Facility welcomes three new experiments INL User Facility welcomes three new experiments March 17, 2010 - 12:27pm Addthis Idaho Falls - The number of universities conducting nuclear energy experiments in Idaho National Laboratory's one-of-a-kind research reactor has now reached an even dozen. Three universities have been chosen to begin the next round of experiments at INL's Advanced Test Reactor National Scientific User Facility (ATR NSUF). The ATR NSUF grants free access so university-led research teams can use the ATR and other resources at INL and affiliated partner institutions. The three projects were chosen from 11 proposals that were submitted during the most recent solicitation for the user facility. The University of California, Berkeley; University of Nevada, Las Vegas; and Idaho State

284

Energy Department Announces Small Modular Reactor Technology Partnerships  

Broader source: Energy.gov (indexed) [DOE]

Small Modular Reactor Technology Small Modular Reactor Technology Partnerships at Savannah River Site Energy Department Announces Small Modular Reactor Technology Partnerships at Savannah River Site March 2, 2012 - 10:27am Addthis WASHINGTON, D.C. -- The U.S. Energy Department and its Savannah River Site (SRS) announced today three public-private partnerships to develop deployment plans for small modular nuclear reactor (SMR) technologies at SRS facilities, near Aiken, South Carolina. As part of the Energy Department's commitment to advancing the next generation of nuclear reactor technologies and breaking down the technical and economic barriers to deployment, these Memorandums of Agreement (MOA) will help leverage Savannah River's land assets, energy facilities and nuclear expertise to

285

High Flux Isotope Reactor (HFIR) | Nuclear Science | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

High Flux Isotope Reactor High Flux Isotope Reactor May 30, 2013 The High Flux Isotope Reactor (HFIR) first achieved criticality on August 25, 1965, and achieved full power in August 1966. It is a versatile 85-MW isotope production, research, and test reactor with the capability and facilities for performing a wide variety of irradiation experiments and a world-class neutron scattering science program. HFIR is a beryllium-reflected, light water-cooled and moderated flux-trap type swimming pool reactor that uses highly enriched uranium-235 as fuel. HFIR typically operates seven 23-to-27 day cycles per year. Irradiation facility capabilities include Flux trap positions: Peak thermal flux of 2.5X1015 n/cm2/s with similar epithermal and fast fluxes (Highest thermal flux available in the

286

SHARP: Reactor Performance and Safety Simulation Suite  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

SHARP SHARP Argonne National Laboratory's Reactor Performance and Safety Simulation Suite SHARP could save millions in nuclear reactor design and development... The Simulation-based High-efficiency Advanced Reactor Prototyping (SHARP) suite of codes enables virtual design and engineering of nuclear plant behavior that would be impractical from a traditional experimental approach. ...by leveraging the computational power of one of the world's most powerful supercomputers. Exploiting the power of Argonne Leadership Computing Facility's near-petascale computers, researchers have developed a set of simulation tools that provide a highly detailed description of the reactor core and the nuclear plant behavior. This enables the efficient and precise design of tomorrow's safe and clean nuclear energy sources.

287

NREL: Biomass Research - Thermochemical Users Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Users Facility Users Facility Text version The state-of-the-art Thermochemical Users Facility (TCUF) consists of several complementary unit operations that can be configured to accommodate the testing and development of various reactors, filters, catalysts, and other unit operations. The TCUF offers clients the capability to test new processes and feedstocks in a timely and cost-effective manner and to quickly and safely obtain extensive performance data on their processes or equipment. The Thermochemical Users Facility contains the following equipment: Thermochemical Process Development Unit The heart of the TCUF is the 0.5-metric-ton-per-day Thermochemical Process Development Unit (TCPDU), which can be operated in either a pyrolysis or gasification mode. The main unit operations in the TCPDU include 8-inch

288

Nuclear Facility Operations | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Facility Operations Facility Operations Nuclear Facility Operations INL is a science-based, applied engineering national laboratory dedicated to meeting the nation's environmental, energy, nuclear technology, and national security needs. INL is a science-based, applied engineering national laboratory dedicated to meeting the nation's environmental, energy, nuclear technology, and national security needs. The Idaho Operations Office oversees these contract activities in accordance with DOE directives. INL is a multi-program laboratory In addition to enabling the Office of Nuclear Energy to develop space power systems and advanced fuel cycle and reactor technologies, INL facilities are used by the National Nuclear Security Administration and other DOE offices, together with other Federal agencies such as the Department of

289

Power Systems Development Facility  

SciTech Connect (OSTI)

This report discusses Test Campaign TC12 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier train with a Siemens Westinghouse Power Corporation (SW) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Gasifier is an advanced circulating fluidized-bed reactor designed to operate as either a combustor or a gasifier using a particulate control device (PCD). While operating as a gasifier, either air or oxygen can be used as the oxidant. Test run TC12 began on May 16, 2003, with the startup of the main air compressor and the lighting of the gasifier start-up burner. The Transport Gasifier operated until May 24, 2003, when a scheduled outage occurred to allow maintenance crews to install the fuel cell test unit and modify the gas clean-up system. On June 18, 2003, the test run resumed when operations relit the start-up burner, and testing continued until the scheduled end of the run on July 14, 2003. TC12 had a total of 733 hours using Powder River Basin (PRB) subbituminous coal. Over the course of the entire test run, gasifier temperatures varied between 1,675 and 1,850 F at pressures from 130 to 210 psig.

None

2003-07-01T23:59:59.000Z

290

Power Systems Development Facility  

SciTech Connect (OSTI)

This report discusses Test Campaign TC15 of the Kellogg Brown & Root, Inc. (KBR) Transport Gasifier train with a Siemens Power Generation, Inc. (SPG) particle filter system at the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama. The Transport Gasifier is an advanced circulating fluidized-bed reactor designed to operate as either a combustor or gasifier using a particulate control device (PCD). While operating as a gasifier, either air or oxygen can be used as the oxidant. Test run TC15 began on April 19, 2004, with the startup of the main air compressor and the lighting of the gasifier startup burner. The Transport Gasifier was shutdown on April 29, 2004, accumulating 200 hours of operation using Powder River Basin (PRB) subbituminous coal. About 91 hours of the test run occurred during oxygen-blown operations. Another 6 hours of the test run was in enriched-air mode. The remainder of the test run, approximately 103 hours, took place during air-blown operations. The highest operating temperature in the gasifier mixing zone mostly varied from 1,800 to 1,850 F. The gasifier exit pressure ran between 200 and 230 psig during air-blown operations and between 110 and 150 psig in oxygen-enhanced air operations.

Southern Company Services

2004-04-30T23:59:59.000Z

291

Technology, Safety and Costs of Decommissioning Nuclear Reactors At Multiple-Reactor Stations  

SciTech Connect (OSTI)

Safety and cost information is developed for the conceptual decommissioning of large (1175-MWe) pressurized water reactors (PWRs) and large (1155-MWe) boiling water reactors {BWRs) at multiple-reactor stations. Three decommissioning alternatives are studied: DECON (immediate decontamination), SAFSTOR (safe storage followed by deferred decontamination), and ENTOMB (entombment). Safety and costs of decommissioning are estimated by determining the impact of probable features of multiple-reactor-station operation that are considered to be unavailable at a single-reactor station, and applying these estimated impacts to the decommissioning costs and radiation doses estimated in previous PWR and BWR decommissioning studies. The multiple-reactor-station features analyzed are: the use of interim onsite nuclear waste storage with later removal to an offsite nuclear waste disposal facility, the use of permanent onsite nuclear waste disposal, the dedication of the site to nuclear power generation, and the provision of centralized services. Five scenarios for decommissioning reactors at a multiple-reactor station are investigated. The number of reactors on a site is assumed to be either four or ten; nuclear waste disposal is varied between immediate offsite disposal, interim onsite storage, and immediate onsite disposal. It is assumed that the decommissioned reactors are not replaced in one scenario but are replaced in the other scenarios. Centralized service facilities are provided in two scenarios but are not provided in the other three. Decommissioning of a PWR or a BWR at a multiple-reactor station probably will be less costly and result in lower radiation doses than decommissioning an identical reactor at a single-reactor station. Regardless of whether the light water reactor being decommissioned is at a single- or multiple-reactor station: • the estimated occupational radiation dose for decommissioning an LWR is lowest for SAFSTOR and highest for DECON • the estimated cost of decommissioning a PWR is lowest for ENTOMB and highest for SAFSTOR • the estimated cost of decommissioning a BWR is lowest for OECON and highest for SAFSTOR. In all cases, SAFSTOR has the lowest occupational radiation dose and the highest cost.

Wittenbrock, N. G.

1982-01-01T23:59:59.000Z

292

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

January 11, 2011 Facility News ARM Mobile Facility Completes Extended Campaign in the Azores; Next Stop-India Bookmark and Share The ARM Mobile Facility obtained data on Graciosa...

293

Facilities Services Overview & Discussion  

E-Print Network [OSTI]

& Finance Facilities Services Director: Jeff Butler Human Resources Administrative Services Engineering) Environmental Services Morrison (3) Admin Services Evans (1) Human Resources Engineering (4) ·EngineeringFacilities Services Overview & Discussion Jeff Butler Director ­ Facilities Services November 2011

Maxwell, Bruce D.

294

Property description and fact-finding report for NPR-3 Natrona County, Wyoming. Addendum to 22 August 1996 study of alternatives for future operations of the naval petroleum and oil shale reserves NPR-3  

SciTech Connect (OSTI)

The U.S. Department of Energy has asked Gustavson Associates, Inc. to serve as an Independent Petroleum Consultant under contract DE-AC01-96FE64202. This authorizes a study and recommendations regarding future development of Naval Petroleum Reserve No. 3 (NPR-3) in Natrona County, Wyoming. The report that follows is the Phase I fact-finding and property description for that study. The United States of America owns 100 percent of the mineral rights and surface rights in 9,321-acre NPR-3. This property comprises the Teapot Dome oil field and related production, processing and other facilities. Discovered in 1914, this field has 632 wells producing 1,807 barrels of oil per day. Production revenues are about $9.5 million per year. Remaining recoverable reserves are approximately 1.3 million barrels of oil. Significant plugging and abandonment (P&A) and environmental liabilities are present.

NONE

1997-05-01T23:59:59.000Z

295

Fuel Fabrication Facility  

National Nuclear Security Administration (NNSA)

Construction of the Mixed Oxide Fuel Fabrication Facility Construction of the Mixed Oxide Fuel Fabrication Facility November 2005 May 2007 June 2008 May 2012...

296

Sandia National Laboratories: Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Center in Vermont Achieves Milestone Installation On September 23, 2014, in Concentrating Solar Power, Energy, Facilities, National Solar Thermal Test Facility, News, News &...

297

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

January 15, 2008 Facility News ARM Mobile Facility Completes Field Campaign in Germany Bookmark and Share Researchers will study severe precipitation events that occurred in...

298

from Isotope Production Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Cancer-fighting treatment gets boost from Isotope Production Facility April 13, 2012 Isotope Production Facility produces cancer-fighting actinium 2:32 Isotope cancer treatment...

299

Programs & User Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities Programs & User Facilities Enabling remarkable discoveries and tools that transform our understanding of energy and matter and advance national, economic, and energy...

300

Facility Data Policy  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facility Data Policy About ESnet Our Mission The Network ESnet History Governance & Policies ESnet Policy Board ESCC Acceptable Use Policy Facility Data Policy Career Opportunities...

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

November 15, 2005 Facility News More Server Power Improves Performance at the ARM Data Management Facility Bookmark and Share Recently, several new Sun servers joined the...

302

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

approximately 22,500 square kilometers, or the approximate area of a modern climate model grid cell. Centered around the SGP Central Facility, these extended facilities are...

303

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

From Coastal Clouds to Desert Dust: ARM Mobile Facility Headed to Africa Bookmark and Share ARM operations staff prepare the ARM Mobile Facility in Point Reyes, California, for...

304

Role of research reactors in training of NPP personnel with special focus on training reactor VR-1  

SciTech Connect (OSTI)

Research reactors play an important role in providing key personnel of nuclear power plants a hands-on experience from operation and experiments at nuclear facilities. Training of NPP (Nuclear Power Plant) staff is usually deeply theoretical with an extensive utilisation of simulators and computer visualisation. But a direct sensing of the reactor response to various actions can only improve the personnel awareness of important aspects of reactor operation. Training Reactor VR-1 and its utilization for training of NPP operators and other professionals from Czech Republic and Slovakia is described. Typical experimental exercises and good practices in organization of a training program are demonstrated. (authors)

Sklenka, L.; Rataj, J.; Frybort, J.; Huml, O. [Dept. of Nuclear Reactors, Faculty of Nuclear Sciences and Physical Engineering, Czech Technical Univ. in Prague, V Holesovickach 2, Prague 8, 180 00 (Czech Republic)

2012-07-01T23:59:59.000Z

305

Nuclear Facilities | Department of Energy  

Energy Savers [EERE]

Nuclear Facilities Nuclear Facilities Nuclear Facilities Locator Map Numerical map data points indicate two or more nuclear facilities in the same geographic location. Nuclear...

306

EIS-0158-S2: Supplemental Environmental Impact Statement Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy developed this statement, the supplement to DOE/EIS-0158, to analyze the environmental and socioeconomic impacts of the sale of Naval Petroleum Reserve No. 1 in Kern County, California to Occidental Petroleum Corporation.

307

Multi-star multi-phase winding for a high power naval propulsion machine with low ripple torques  

E-Print Network [OSTI]

Permanent Magnet (SMPM) Machine designed for naval propulsion is proposed. The design objective of this high if the magnetic couplings between the stars is weak. The 4-star 3-phase winding proposed in this paper is designed star being magnetically shifted by an angle of 15 degrees. This 4-star 3-phase configuration allows

Boyer, Edmond

308

COMPUTER SIMULATION OF THE UMER ELECTRON GUN* I. Haber, Plasma Physics Division, Naval Research Laboratory, Washington, DC 20375  

E-Print Network [OSTI]

COMPUTER SIMULATION OF THE UMER ELECTRON GUN* I. Haber, Plasma Physics Division, Naval Research conducted with the aim of understanding the space-charge-dominated physics in the gun and injector transport is on simulating the beam propagation in the gun region between the cathode grid and the anode grid for comparison

Valfells, Ágúst

309

The Immortal Fausto: The Life, Works, and Ships of the Venetian Humanist and Naval Architect Vettor Fausto (1490-1546)  

E-Print Network [OSTI]

At the beginning of the sixteenth century, the maritime power of the Republic of Venice was seriously threatened by the Ottoman Sultan Suleiman I in the East, and by the Holy Roman Emperor Charles V in the West. In order to regain its naval power...

Campana, Lilia

2014-06-11T23:59:59.000Z

310

Facility Representative Program: 2003 Facility Representative Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

3 Facility Representative Workshop 3 Facility Representative Workshop May 13 - 15, 2003 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Day 1: Tuesday, May 13, 2003 Theme: Program Successes and Challenges 8:00 a.m. John Evans, Facility Representative Program Manager 8:15 a.m. Welcome Kathleen Carlson Manager, Nevada Site Office 8:30 a.m. Keynote Address Savannah River Site and Facility Reps - A Shared History and Common Future Jeffrey M. Allison Manager, Savannah River Operations Office 9:00 a.m. Videotaped Remarks from the Deputy Secretary Kyle E. McSlarrow, Deputy Secretary of Energy 9:10 a.m. Facility Representative of the Year Presentation Mark B. Whitaker, Jr., Departmental Representative to the Defense Nuclear Facilities Safety Board

311

NREL: Research Facilities - Test and User Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Test and User Facilities Test and User Facilities NREL has test and user facilities available to industry and other organizations for researching, developing, and evaluating renewable energy and energy efficiency technologies. Here you'll find an alphabetical listing and brief descriptions of NREL's test and user facilities. A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z A Advanced Research Turbines At our wind testing facilities, we have turbines available to test new control schemes and equipment for reducing loads on wind turbine components. Learn more about the Advanced Research Turbines on our Wind Research website. Back to Top D Distributed Energy Resources Test Facility This facility was designed to assist the distributed power industry in the

312

Facility Representative Program: 2000 Facility Representative Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

0 Facility Representative Workshop 0 Facility Representative Workshop May 16-18, 2000 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Tuesday, May 16, 2000 Theme for Day 1: Sustaining the Success of the Facility Representative Program 8:00 a.m. - Opening Remarks - Joe Arango, Facility Representative Program Manager 8:05 a.m. - Welcome - Kenneth Powers, Deputy Manager Nevada Operations Office 8:15 a.m. - Deputy Secretary Remarks - T. J. Glauthier, Deputy Secretary of Energy 8:30 a.m. - Keynote Address - Jerry Lyle, Assistant Manager for Environmental Management, Idaho Operations Office 9:00 a.m. - Facility Representative of the Year Presentation - Mark B. Whitaker, Departmental Representative 9:30 a.m. - Break 9:50 a.m. - Program Results and Goals - Joe Arango, Facility Representative Program Manager

313

Low-Level Radioactive Waste Disposal Regional Facility Act (Pennsylvania) |  

Broader source: Energy.gov (indexed) [DOE]

Low-Level Radioactive Waste Disposal Regional Facility Act Low-Level Radioactive Waste Disposal Regional Facility Act (Pennsylvania) Low-Level Radioactive Waste Disposal Regional Facility Act (Pennsylvania) < Back Eligibility Utility Investor-Owned Utility State/Provincial Govt Industrial Construction Municipal/Public Utility Local Government Program Info State Pennsylvania Program Type Environmental Regulations Fees This act establishes a low-level radioactive waste disposal regional facility siting fund that requires nuclear power reactor constructors and operators to pay to the Department of Environmental Resources funds to be utilized for disposal facilities. This act ensures that nuclear facilities and the Department comply with the Low-Level Radioactive Disposal Act. The regional facility siting fund is used for reimbursement of expenses

314

SRS Small Modular Reactors  

SciTech Connect (OSTI)

The small modular reactor program at the Savannah River Site and the Savannah River National Laboratory.

None

2012-04-27T23:59:59.000Z

315

SRS Small Modular Reactors  

ScienceCinema (OSTI)

The small modular reactor program at the Savannah River Site and the Savannah River National Laboratory.

None

2014-05-21T23:59:59.000Z

316

FEMP ESPC Success Story - U.S. Naval Station, Guantanamo Bay, Cuba  

Broader source: Energy.gov (indexed) [DOE]

a m a m ESPC Success Stories Environmental Stewardship and Cost Savings These photographs chronicle the installation of the wind turbines at John Paul Jones Hill, Guantanamo Bay. The four wind turbine towers are about 185 feet high. The blade lengths are 90 feet. The top of the blades are about 275 feet off the g round. The blades rotate at a maximum of 22 RPM, or a rotation every three seconds. This translates to a blade tip speed of 140 mph. During construction there were as many as 20 workers on the project. However, operating the wind turbines will only take one part-time staff-person who will check on them daily. Photos courtesy of: Jeffrey M. Johnston, Public Works Officer, Guantanamo Bay; Paul DelSignore, NFESC; Daniel Ingold, NORESCO. U.S. NAVAL STATION

317

Rocky Mountain Oilfield Testing Center RMOTC at the Naval Petroleum Reserve No. 3  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

& Renewable Energy Scoping Meeting & Renewable Energy Scoping Meeting March 26, 2004 2 2 RMOTC The Rocky Mountain Oilfield Testing Center (RMOTC), is an operating oil field focusing on environmentally-balanced energy technologies and alternatives, and is the premiere energy testing and demonstration field in the nation. 3 3 * the opportunity to explore environmentally- balanced solutions to the nation's energy issues * opportunities to develop, demonstrate, and evaluate a variety of energy related technologies * a chance to collaborate with top professionals in the energy, environmental technology, and engineering fields * shared industry knowledge through technology transfer via reports, journal articles, and presentations Located within the Naval Petroleum Reserve No. 3 (NPR-3) near Casper, Wyoming, RMOTC offers:

318

Department of Energy, Office of Naval Petroleum & Oil Shale Reserves  

Broader source: Energy.gov (indexed) [DOE]

Request for Records Disposition Authority Leave Blank (NARA Use Only) (See Instructions on reverse) Job Number I / {£. 0- _~ To. National Archives and Records Administration (NIR) NI-'-r 3 7- 6 6 J Washington, DC 20408 Date Received 1 From (Agencyor establishment) Department of Energy Notification to Agency 2 MajorSubdivrsion In accordance with the provisions of 44 Assistant Secretary for Fossil Energy USC 3303a. the disposition request. In- cluding amendments. ISapproved except for 3 Minorsubcrvrsron Items that may be marked "disposrtron not Office of Naval Petroleum & Oil Shale Reserves approved" or "withdrawn" In column 10 4 Nameof Personwith whom to confer 5 Telephone (Includearea code) [ Pamela Gentel 301-903-1856 6 Agency Certification

319

Major General Harold Holesinger The Adjutant General Illinois Kilitary and Naval Dept.  

Office of Legacy Management (LM)

General Harold Holesinger General Harold Holesinger The Adjutant General Illinois Kilitary and Naval Dept. 1301 North MacArthur Boulevard Springfield, Illinois 62702-2399 Dear General Holesinger: I am enclosing a copy of the radiological survey report for the National Guard Armory, Chicago, Illinois. Although the data ncted in the report indicate levels of radioactivity in excess of current guidelines, the radioactive residues presently there do not pose a health hazard provided they were not disturbed in the past and will not be disturbed in the future; i.e., no excavation, building, or construction that would disturb the areas in which contamination was found. Based on these data and on an authority record review, the National Guard Armory property is being authorized for remedial action and will be

320

Environmental Survey preliminary report, Naval Petroleum Reserves in California (NPRC), Tupman, California  

SciTech Connect (OSTI)

This report presents the preliminary environmental findings from the first phase of the Environmental Survey of the US Department of Energy (DOE) Naval Petroleum Reserves 1 (NPR-1) and 2 (NPR-2) in California (NPRC), conducted May 9--20, 1988. The Survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with NPRC. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. The on-site phase of the Survey involved the review of existing site environmental data, observations of the operations carried on at NPRC, and interviews with site personnel. 120 refs., 28 figs., 40 tabs.

Not Available

1989-02-01T23:59:59.000Z

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

Vertical Drop of the Naval SNF Long Waste Package On Unyielding Surface  

SciTech Connect (OSTI)

The purpose of this calculation is to determine the structural response of a Naval SNF (Spent Nuclear Fuel) Long Waste Package (WP) subjected to 2 m-vertical drop on unyielding surface (US). The scope of this document is limited to reporting the calculation results in terms of maximum stress intensities. This calculation is associated with the waste package design; calculation is performed by the Waste Package Design group. AP-3.12Q, Revision 0, ICN 0, Calculations, is used to perform the calculation and develop the document. The finite element calculation is performed by using the commercially available ANSYS Version (V) 5.4 finite element code. The result of this calculation is provided in terms of maximum stress intensities.

S. Mastilovic

2006-07-21T23:59:59.000Z

322

Naval Petroleum Reserves: assessment of alternative operating strategies beyond 1982. Analysis and supporting data  

SciTech Connect (OSTI)

Legislation authorizing production from two of the Naval Petroleum Reserves, i.e., NPR-1 (Elk Hills, California) and NPR-3 (Teapot Dome, Wyoming), expires in 1982. This paper presents analyses and supporting data concerning the trade-offs of extending production or returning to a shut-in status in order to provide the Department of Energy with information needed to formulate a recommendation. The primary objective of the study is to evaluate a range of possible futures (through 1990) to determine technical, economic, energy, strategic and political trade-offs between the two options. A secondary objective is to develop a data base for use by DOE to respond to questions and issues raised by interested parties during executive branch and Congressional reviews.

Gsellman, L.R.; Mendis, M.S.; Rosenberg, J.I.

1981-06-01T23:59:59.000Z

323

Rocky Mountain Oilfield Testing Center RMOTC at the Naval Petroleum Reserve No. 3  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

OILFIELD TESTING OILFIELD TESTING OILFIELD TESTING CENTER CENTER 2 2 HISTORY OF TEAPOT DOME Mark Milliken 3 3 TEAPOT DOME LOCATION 4 4 Salt Creek 670 MMBBLS 722 BCF Teapot Dome 27 MMBBLS 57 BCF N P R - 3 Cumulative Production 5 5 The Great White Fleet December 1907 - February 1909 6 6 THE END OF COAL-FIRED SHIPS * 2-week cruising time. * Labor and time intensive cleaning and reloading. * At the mercy of foreign countries for coal supply. * 1912: All battleships will be oil-powered. Great White Fleet 7 7 NAVAL PETROLEUM RESERVES ARE BORN * 1908: Dr. Otis Smith, USGS Director, recommends DOI retain oil lands for fuel reserve for Navy. * 1909: Taft withdraws 3,000,000 acres in Wyoming and California. * 1910: Concern over the President's authority to withdraw lands, so Congress passed the Pickett Act. * 1910: Taft issues a 2nd land withdrawal executive

324

Order Module--DOE O 420.1B, FACILITY SAFETY | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

DOE O 420.1B, FACILITY SAFETY DOE O 420.1B, FACILITY SAFETY Order Module--DOE O 420.1B, FACILITY SAFETY To ensure that new DOE hazard category 1, 2, and 3 nuclear facilities are designed and constructed in a manner that ensures adequate protection to the public, workers, and the environment from nuclear hazards. To ensure that major modifications to hazard category 1, 2, and 3 nuclear facilities comply with the design and construction requirements for new hazard category 1, 2, and 3 nuclear facilities. To ensure that new DOE nuclear reactors comply with the requirements of DOE O 420.1B and the design requirements of DOE O 5480.30, Nuclear Reactor Safety Design Criteria. DOE Order Self Study Modules - DOE O 420.1B Facility Safety More Documents & Publications Order Module--DOE O 420.2B, SAFETY OF ACCELERATOR FACILITIES

325

Nuclear reactor  

DOE Patents [OSTI]

A nuclear reactor comprising a cylindrical pressure vessel, an elongated annular core centrally disposed within and spaced from the pressure vessel, and a plurality of ducts disposed longitudinally of the pressure vessel about the periphery thereof, said core comprising an annular active portion, an annular reflector just inside the active portion, and an annular reflector just outside the active a portion, said annular active portion comprising rectangular slab, porous fuel elements radially disposed around the inner reflector and extending the length of the active portion, wedge-shaped, porous moderator elements disposed adjacent one face of each fuel element and extending the length of the fuel element, the fuel and moderator elements being oriented so that the fuel elements face each other and the moderator elements do likewise, adjacent moderator elements being spaced to provide air inlet channels, and adjacent fuel elements being spaced to provide air outlet channels which communicate with the interior of the peripheral ducts, and means for introducing air into the air inlet channels which passes through the porous moderator elements and porous fuel elements to the outlet channel.

Thomson, Wallace B. (Severna Park, MD)

2004-03-16T23:59:59.000Z

326

Matched Index of Refraction Flow Facility  

ScienceCinema (OSTI)

What's 27 feet long, 10 feet tall and full of mineral oil (3000 gallons' worth)? If you said INL's Matched Index of Refraction facility, give yourself a gold star. Scientists use computers to model the inner workings of nuclear reactors, and MIR helps validate those models. INL's Hugh McIlroy explains in this video. You can learn more about INL energy research at the lab's facebook site http://www.facebook.com/idahonationallaboratory.

Mcllroy, Hugh

2013-05-28T23:59:59.000Z

327

Commissioning for Federal Facilities  

Broader source: Energy.gov [DOE]

Guide describes building commissioning, recommissioning, retrocommissioning, and continuous commissioning for federal facilities.

328

Development and Evaluation of a Safeguards System Concept for a Pebble-Fueled High Temperature Gas-cooled Reactor  

E-Print Network [OSTI]

............................................................................................... 24 8 Flow diagram for an Advanced CANDU reactor ..................................... 27 9 Implementation of safeguards measures at a CANDU facility using video surveillance and radiation monitors... ................................................ 28 10 Implementation of safeguards measures at a CANDU facility using core discharge monitor.............................................................................. 28 11 Primary safeguards measures at MONJU Fast Reactor in Japan...

Gitau, Ernest Travis Ngure

2012-10-19T23:59:59.000Z

329

STATEMENT OF CONSIDERATIONS Advance Test Reactor Class Waiver  

Broader source: Energy.gov (indexed) [DOE]

Advance Test Reactor Class Waiver Advance Test Reactor Class Waiver W(C)-2008-004 The Advanced Test Reactor (A TR) is a pressurized water test reactor at the Idaho National Laboratory (INL) that operates at low pressure and temperature. The ATR was originally designed to study the effects of intense radiation on reactor material and fuels . It has a "Four Leaf Clover" design that allows a diverse array of testing locations. The unique design allows for different flux in various locations and specialized systems also allow for certain experiments to be run at their own temperature and pressure. The U.S. Department of Energy (DOE) designated the Advanced Test Reactor (ATR) as a National Scientific User Facility (NSUF) in April 2007. This designation will allow the ATR to

330

University Research Reactor Task Force to the Nuclear Energy Research  

Broader source: Energy.gov (indexed) [DOE]

University Research Reactor Task Force to the Nuclear Energy University Research Reactor Task Force to the Nuclear Energy Research Advisory Committee University Research Reactor Task Force to the Nuclear Energy Research Advisory Committee In mid-February, 2001 The University Research Reactor (URR) Task Force (TF), a sub-group of the Department of Energy (DOE) Nuclear Energy Research Advisory Committee (NERAC), was asked to: * Analyze information collected by DOE, the NERAC "Blue Ribbon Panel," universities, and other sources pertaining to university reactors including their research and training capabilities, costs to operate, and operating data, and * Provide DOE with clear, near-term recommendations as to actions that should be taken by the Federal Government and a long-term strategy to assure the continued operation of vital university reactor facilities in

331

The High Flux Isotope Reactor at Oak Ridge National Laboratory  

Broader source: All U.S. Department of Energy (DOE) Office Webpages

The High Flux Isotope Reactor at ORNL The High Flux Isotope Reactor at ORNL Aerial of the High Flux Isotope Reactor Site The High Flux Isotope Reactor site is located on the south side of the ORNL campus and is about a three-minute drive from her sister neutron facility, the Spallation Neutron Source. Operating at 85 MW, HFIR is the highest flux reactor-based source of neutrons for research in the United States, and it provides one of the highest steady-state neutron fluxes of any research reactor in the world. The thermal and cold neutrons produced by HFIR are used to study physics, chemistry, materials science, engineering, and biology. The intense neutron flux, constant power density, and constant-length fuel cycles are used by more than 500 researchers each year for neutron scattering research into

332

Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight  

Broader source: Energy.gov (indexed) [DOE]

Safety Culture in the US Nuclear Regulatory Commission's Reactor Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight Process Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight Process September 19, 2012 Presenter: Undine Shoop, Chief, Health Physics and Human Performance Branch, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission Topics covered: Purpose of the Reactor Oversight Process (ROP) ROP Framework Safety Culture within the ROP Safety Culture Assessments Safety Culture in the US Nuclear Regulatory Commission's Reactor Oversight Process More Documents & Publications A Commissioner's Perspective on USNRC Actions in Response to the Fukushima Nuclear Accident Comparison of Integrated Safety Analysis (ISA) and Probabilistic Risk Assessment (PRA) for Fuel Cycle Facilities, 2/17/11

333

CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor  

Broader source: Energy.gov (indexed) [DOE]

Reactor Contractor ORR Reactor Contractor ORR CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR February 2007 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Maintenance Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Maintenance - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR More Documents & Publications CRAD, Engineering - Oak Ridge National Laboratory High Flux Isotope Reactor

334

Engineering Test Reactor (ETR) Vessel Relocated after 50 years.  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Printer Friendly Printer Friendly Engineering Test Reactor (ETR) Vessel Relocated Engineering Test Reactor Vessel Pre-startup 1957 Click on image to enlarge. Image 1 of 5 Gantry jacks attached to ETR vessel. Initial lift starts. - Click on image to enlarge. Image 2 of 5 ETR vessel removed from substructure. Vessel lifted approximately 40 ft. - Click on image to enlarge. On Monday, September 24, 2007 the Engineering Test Reactor (ETR) vessel was removed from its location and delivered to the Idaho CERCLA Disposal Facility (ICDF). The long history of the ETR began for this water-cooled reactor with its start up in 1957, after taking only 2 years to build. According to "Proving the Principles," by Susan M. Stacy: When the Engineering Test Reactor started up at the Test Reactor Area in

335

The Cornell University cold neutron beam facility  

SciTech Connect (OSTI)

The final version of a cold neutron beam facility under development at the Cornell 500-kW TRIGA reactor is nearing completion. The facility will provide an ultra-low background subthermal neutron beam, primarily for nuclear reaction experiments such as (n,gamma) and (n,ce) studies and applications such as prompt gamma neutron activation analysis. Its uses will also include exploration of new cold neutron methods and training of graduate students in cold neutron techniques. The facility employs a 13-m long Curved (500-m radius) Ni-on-glass neutron guide (2 cm x 5 cm) to filter out fast neutrons and gamma rays, location of the guide exit in a room isolated from other beams, cold neutrons to increase transmission through the guide, a mesitylene moderator at ca. 30K that avoids hazards of liquid hydrogen or solid methane, and cooling by Cu cold fingers attached to a cryorefrigerator outside the reactor bulk shield. The mesitylene chamber and the first 3 meters of guide are installed in a standard beamplug shell so that no modifications of the reactor structure were required. Design features of the cold source proper have been published in an article that also describes earlier stages of the project, and more recent design details and extensive subsystem tests are reported elsewhere. Final assembly and testing of the beamplug assembly is Currently underway (June 1994); completion is expected in Fall 1994. The project has involved more than seven graduate and undergraduate students.

Clark, D.D. [Cornell Univ., Ithaca, NY (United States)

1994-12-31T23:59:59.000Z

336

MANAGING BERYLLIUM IN NUCLEAR FACILITY APPLICATIONS  

SciTech Connect (OSTI)

Beryllium plays important roles in nuclear facilities. Its neutron multiplication capability and low atomic weight make it very useful as a reflector in fission reactors. Its low atomic number and high chemical affinity for oxygen have led to its consideration as a plasma-facing material in fusion reactors. In both applications, the beryllium and the impurities in it become activated by neutrons, transmuting them to radionuclides, some of which are long-lived and difficult to dispose of. Also, gas production, notably helium and tritium, results in swelling, embrittlement, and cracking, which means that the beryllium must be replaced periodically, especially in fission reactors where dimensional tolerances must be maintained. It has long been known that neutron activation of inherent iron and cobalt in the beryllium results in significant {sup 60}Co activity. In 2001, it was discovered that activation of naturally occurring contaminants in the beryllium creates sufficient {sup 14}C and {sup 94}Nb to render the irradiated beryllium 'Greater-Than-Class-C' for disposal in U.S. radioactive waste facilities. It was further found that there was sufficient uranium impurity in beryllium that had been used in fission reactors up to that time that the irradiated beryllium had become transuranic in character, making it even more difficult to dispose of. In this paper we review the extent of the disposal issue, processes that have been investigated or considered for improving the disposability of irradiated beryllium, and approaches for recycling.

R. Rohe; T. N. Tranter

2011-12-01T23:59:59.000Z

337

A Simplified Shuttle Irradiation Facility for ATR  

SciTech Connect (OSTI)

During the past fifteen years there has been a steady increase in the demand for radioisotopes in nuclear medicine and a corresponding decline in the number of reactors within the U.S. capable of producing them. The Advanced Test Reactor (ATR) is the largest operating test reactor in the U.S., but its isotope production capabilities have been limited by the lack of an installed isotope shuttle irradiation system. A concept for a simple "low cost" shuttle irradiation facility for ATR has been developed. Cost were reduced (in comparison to previous ATR designs) by using a shielded trough of water installed in an occupiable cubicle as a shielding and contamination control barrier for the send and receive station. This shielding concept also allows all control valves to be operated by hand and thus the need for an automatic control system was eliminated. It was determined that 4-5 ft of water would be adequate to shield the isotopes of interest while shuttles are transferred to a small carrier. An additional feature of the current design is a non-isolatable by-pass line, which provides a minimum coolant flow to the test region regardless of which control valves are opened or closed. This by-pass line allows the shuttle facility to be operated without bringing reactor coolant water into the cubicle except for send and receive operations.

A. J. Palmer; S. T. Laflin

1999-08-01T23:59:59.000Z

338

Modifications to the NRAD Reactor, 1977 to present  

SciTech Connect (OSTI)

Argonne National Laboratory-West, operated by the University of Chicago, is located near Idaho Falls, ID, on the Idaho National Engineering laboratory Site. ANL-West performs work in support of the Liquid Metal Fast Breeder Reactor Program (LMFBR) sponsored by the United States Department of Energy. The NRAD reactor is located at the Argonne Site within the Hot Fuel Examination Facility/North, a large hot cell facility where both non-destructive and destructive examinations are performed on highly irradiated reactor fuels and materials in support of the LMFBR program. The NRAD facility utilizes a 250-kW TRIGA reactor and is completely dedicated to neutron radiography and the development of radiography techniques. Criticality was first achieved at the NRAD reactor in October of 1977. Since that time, a number of modifications have been implemented to improve operational efficiency and radiography production. This paper describes the modifications and changes that significantly improved operational efficiency and reliability of the reactor and the essential auxiliary reactor systems.

Weeks, A.A.; Pruett, D.P.; Heidel, C.C.

1986-01-01T23:59:59.000Z

339

EVALUATION OF ACTIVATION PRODUCTS IN REMAINING IN REMAINING K-, L- AND C-REACTOR STRUCTURES  

SciTech Connect (OSTI)

An analytic model and calculational methodology was previously developed for P-reactor and R-reactor to quantify the radioisotopes present in Savannah River Site (SRS) reactor tanks and the surrounding structural materials as a result of neutron activation of the materials during reactor operation. That methodology has been extended to K-reactor, L-reactor, and C-reactor. The analysis was performed to provide a best-estimate source term input to the Performance Assessment for an in-situ disposition strategy by Site Decommissioning and Demolition (SDD). The reactor structure model developed earlier for the P-reactor and R-reactor analyses was also used for the K-reactor and L-reactor. The model was suitably modified to handle the larger Creactor tank and associated structures. For all reactors, the structure model consisted of 3 annular zones, homogenized by the amount of structural materials in the zone, and 5 horizontal layers. The curie content on an individual radioisotope basis and total basis for each of the regions was determined. A summary of these results are provided herein. The efficacy of this methodology to accurately predict the radioisotopic content of the reactor systems in question has been demonstrated and is documented in Reference 1. As noted in that report, results for one reactor facility cannot be directly extrapolated to other SRS reactors.

Vinson, D.; Webb, R.

2010-09-30T23:59:59.000Z

340

Facility Representative Program: 2010 Facility Representative Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

10 Facility Representative Workshop 10 Facility Representative Workshop May 12 - 13, 2010 Las Vegas, NV Facility Rep of the Year Award | Attendees | Summary Report Workshop Agenda and Presentations Day 1: Wednesday, May 12, 2010 8:00 a.m. Opening Remarks James Heffner, Facility Representative Program Manager Earl Hughes, Safety System Oversight Program Manager Office of Nuclear Safety Policy and Assistance Office of Health, Safety and Security 8:15 a.m. Welcome from the Nevada Site Office John Mallin, Deputy Assistant Manager for Site Operations Nevada Site Office 8:30 a.m. Workshop Keynote Address Todd Lapointe Chief of Nuclear Safety Central Technical Authority Staff 9:15 a.m. Facility Representative and Safety System Oversight Award Ceremony James Heffner, Facility Representative Program Manager

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Facility Representative Program: 2007 Facility Representative Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7 Facility Representative Workshop 7 Facility Representative Workshop May 15 - 17, 2007 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Final Day 1: Tuesday, May 15, 2007 8:00 a.m. Opening Remarks Joanne Lorence, Facility Representative Program Manager 8:15 a.m. Welcome from the Nevada Site Office Gerald Talbot, Manager, Nevada Site Office 8:30 a.m. Videotaped Remarks from the Deputy Secretary The Honorable Clay Sell, Deputy Secretary of Energy 8:45 a.m. Keynote Address - Safety Oversight Perspective and Expectations Glenn Podonsky, Chief Health, Safety and Security Officer, Office of Health, Safety and Security 9:10 a.m. Facility Representative of the Year Presentation Mark B. Whitaker, Jr., Departmental Representative to the Defense Nuclear Facilities Safety Board,

342

Facility Representative Program: 2001 Facility Representative Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

1 Facility Representative Workshop 1 Facility Representative Workshop May 15 - 17, 2001 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Day 1: Tuesday, May 15, 2001 Theme: Program Successes and Challenges 8:00 a.m. - Logistics Announcements & Opening Remarks - Joe Arango, Facility Representative Program Manager 8:15 a.m. - Welcome - Debbie Monette, Assistant Manager for National Security, Nevada Operations Office 8:30 a.m. - Keynote Address - Ralph Erickson, National Nuclear Security Administration 9:00 a.m.- DOE Facility Representative of the Year Presentation - Mark B. Whitaker, Jr., Departmental Representative to the Defense Nuclear Facilities Safety Board 9:30 a.m. - Break 9:50 a.m. - Program Summary - Joe Arango 10:10 a.m. - Management Panel/Questions and Answers

343

EIS-0070: Mining, Construction and Operation for a Full-size Module at the Anvil Points Oil Shale Facility, Rifle, Garfield County, Colorado  

Broader source: Energy.gov [DOE]

The U.S. Department of Energy prepared this environmental impact statement to assess the environmental and socioeconomic implications of its proposal to mine 11 million tons of oil shale from the Naval Oil Shale Reserves (NOSR) at Anvil Points, Colorado; to construct an experimental full-size shale retort module on a 365-acre lease tract having a 4700 bbl/day production capacity; and to consider extension, modification or new leasing of the facility.

344

IGORR-IV -- Proceedings of the fourth meeting of the International Group on Research Reactors  

SciTech Connect (OSTI)

The International Group on Research Reactors was formed to facilitate the sharing of knowledge and experience among those institutions and individuals who are actively working to design, build, and promote new research reactors or to make significant upgrades to existing facilities. Twenty-nine papers were presented in five sessions and written versions of the papers or hard copies of the vugraphs used are published in these proceedings. The five sessions were: (1) Operating Research Reactors and Facility Upgrades; (2) Research Reactors in Design and Construction; (3) ANS Closeout Activities; (4) and (5) Research, Development, and Analysis Results.

Rosenbalm, K.F. [comp.] [comp.

1995-12-31T23:59:59.000Z

345

Monte Carlo estimation of the dose and heating of cobalt adjuster rods irradiated in the CANDU 6 reactor core  

Science Journals Connector (OSTI)

......cobalt adjuster rods irradiated in the CANDU 6 reactor core Daniela Gugiu Ion Dumitrache...adjuster rods with cobalt assemblies in the CANDU 6 reactor core. The 60Co produced by 59Co...the cobalt adjusters. INTRODUCTION In CANDU reactors, one has the facility to replace......

Daniela Gugiu; Ion Dumitrache

2005-12-20T23:59:59.000Z

346

NREL: Photovoltaics Research - Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities Facilities NREL's world-class research facilities provide the venue for innovative advances in photovoltaic technologies and applications. These facilities within the National Center for Photovoltaics (NCPV) serve both multi-use and dedicated-use functions. We encourage our research colleagues in industry, universities, and other laboratories to pursue opportunities in working with our staff in these facilities. Dedicated-Use Facilities Photo of a red-hot coil glowing inside a round machine. Research within these facilities focuses on targeted areas of interest that require specific tools, techniques, or unique capabilities. Our two main dedicated-use facilities are the following: Outdoor Test Facility (OTF) OTF researchers study and evaluate advanced or emerging PV technologies

347

CRAD, Facility Safety- Nuclear Facility Safety Basis  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) that can be used for assessment of a contractor's Nuclear Facility Safety Basis.

348

Hot cell facility design for large fusion devices  

SciTech Connect (OSTI)

Large hot cell facilities will be necessary to support the operation of large fusion devices. The supporting hot cells will be needed to serve a variety of different functions and tasks, which include reactor component maintenance, tool and maintenance equipment repair, and preparation of radioactive material for shipment and disposal. This paper discusses hot cell facility functions, requirements, and design issues and techniques. Suggested solutions and examples are given.

Barrett, R.J.; Bussell, G.T.

1985-01-01T23:59:59.000Z

349

Hot cell facility design for large fusion devices  

SciTech Connect (OSTI)

Large hot cell facilities will be necessary to support the operation of large fusion devices. The supporting hot cells will be needed to serve a variety of different functions and tasks, which include reactor component maintenance, tool and maintenance equipment repair, and preparation of radioactive material for shipment and disposal. This paper discusses hot cell facility functions, requirements, and design issues and techniques. Suggested solutions and examples are given.

Barrett, R.J.; Bussell, G.T.

1985-07-01T23:59:59.000Z

350

New Groundwater Treatment Facility Begins Operation: Boost in Cleanup  

Broader source: Energy.gov (indexed) [DOE]

New Groundwater Treatment Facility Begins Operation: Boost in New Groundwater Treatment Facility Begins Operation: Boost in Cleanup Accelerated by Recovery Act Funding New Groundwater Treatment Facility Begins Operation: Boost in Cleanup Accelerated by Recovery Act Funding January 19, 2011 - 12:00pm Addthis Media Contacts Andre Armstrong, CH2M HILL (509)376-6773 Andre_L_Armstrong@rl.gov Geoff Tyree, DOE (509) 376-4171 Geoffrey.Tyree@rl.doe.gov RICHLAND, WASH. - The U.S. Department of Energy (DOE) is boosting its capacity for treating groundwater to remove chromium near the Columbia River by 40 percent with the recent completion of a new treatment facility. Contractor CH2M HILL Plateau Remediation Company (CH2M HILL) finished building and started operating the new 100-DX groundwater treatment facility in December. The facility is located near the D and DR Reactors on

351

Facility Representative Program: Facility Representative Program Sponsors  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facility Representative Program Sponsors Facility Representative Program Sponsors There are 29 Facility Representative Program Sponsors Office Name Title E-Mail Phone ASO Larry Pendexter ES&H Div Dir (Argonne) larry.pendexter@ch.doe.gov 630-252-1485 BHSO Bob Desmarais Operations Management Division Director desmarai@bnl.gov 631-344-5434 CBFO Glenn Gamlin Facility Representative Supervisor glenn.gamlin@wipp.ws 575-234-8136 CBFO Casey Gadbury Operations Manager casey.gadbury@wipp.ws 575-234-7372 FSO Mark Bollinger Deputy Manager Mark.Bollinger@ch.doe.gov 630-840-8130 FSO John Scott FR Team Lead john.scott@ch.doe.gov 630-840-2250 HS-30 James O'Brien Director, Office of Nuclear Safety James.O'Brien@hq.doe.gov 301-903-1408 HS-32 Earl Hughes Facility Representative Program Manager Earl.Hughes@hq.doe.gov 202-586-0065

352

Advanced Safeguards Approaches for New Reprocessing Facilities  

SciTech Connect (OSTI)

U.S. efforts to promote the international expansion of nuclear energy through the Global Nuclear Energy Partnership (GNEP) will result in a dramatic expansion of nuclear fuel cycle facilities in the United States. New demonstration facilities, such as the Advanced Fuel Cycle Facility (AFCF), the Advanced Burner Reactor (ABR), and the Consolidated Fuel Treatment Center (CFTC) will use advanced nuclear and chemical process technologies that must incorporate increased proliferation resistance to enhance nuclear safeguards. The ASA-100 Project, “Advanced Safeguards Approaches for New Nuclear Fuel Cycle Facilities,” commissioned by the NA-243 Office of NNSA, has been tasked with reviewing and developing advanced safeguards approaches for these demonstration facilities. Because one goal of GNEP is developing and sharing proliferation-resistant nuclear technology and services with partner nations, the safeguards approaches considered are consistent with international safeguards as currently implemented by the International Atomic Energy Agency (IAEA). This first report reviews possible safeguards approaches for the new fuel reprocessing processes to be deployed at the AFCF and CFTC facilities. Similar analyses addressing the ABR and transuranic (TRU) fuel fabrication lines at AFCF and CFTC will be presented in subsequent reports.

Durst, Philip C.; Therios, Ike; Bean, Robert; Dougan, A.; Boyer, Brian; Wallace, Richard; Ehinger, Michael H.; Kovacic, Don N.; Tolk, K.

2007-06-24T23:59:59.000Z

353

TRANSPORTATION CASK RECEIPT/RETURN FACILITY CRITICALITY SAFETY EVALUATIONS  

SciTech Connect (OSTI)

The purpose of this design calculation is to demonstrate that the handling operations of transportation casks performed in the Transportation Cask Receipt and Return Facility (TCRRF) and Buffer Area meet the nuclear criticality safety design criteria specified in the ''Project Design Criteria (PDC) Document'' (BSC [Bechtel SAIC Company] 2004 [DIRS 171599], Section 4.9.2.2), and the functional nuclear criticality safety requirement described in the ''Transportation Cask Receipt/Return Facility Description Document'' (BSC 2004 [DIRS 170217], Section 3.2.3). Specific scope of work contained in this activity consists of the following items: (1) Evaluate criticality effects for both dry and fully flooded conditions pertaining to TCRRF and Buffer Area operations for defense in depth. (2) Evaluate Category 1 and 2 event sequences for the TCRRF as identified in the ''Categorization of Event Sequences for License Application'' (BSC 2004 [DIRS 167268], Section 7). This evaluation includes credible fuel reconfiguration conditions. In addition to the scope of work listed above, an evaluation was also performed of modeling assumptions for commercial spent nuclear fuel (CSNF) regarding inclusion of plenum and end regions of the active fuel. This calculation is limited to CSNF and US Department of Energy (DOE) SNF. it should be mentioned that the latter waste form is evaluated more in depth in the ''Canister Handling Facility Criticality Safety Calculations (BSC 2004 [DIRS 167614]). Further, the design and safety analyses of the naval SNF canisters are the responsibility of the US Department of the Navy (Naval Nuclear Propulsion Program) and will not be included in this document. In addition, this calculation is valid for the current design of the TCRRF and Buffer Area and may not reflect the ongoing design evolution of the facility. However, it is anticipated that design changes to the facility layout will have little or no impact on the criticality results and/or conclusions presented in this document. This calculation is subject to the ''Quality Assurance Requirements and Description'' (DOE 2004 [DIRS 171539]) because the TCRRF is included in the Q-List (BSC 2004 [DIRS 168361], p. A-3) as an item important to safety. This calculation is prepared in accordance with AP-3.12Q, ''Design Calculations and Analyses'' [DIRS 168413].

C.E. Sanders

2005-04-26T23:59:59.000Z

354

Resource book: Decommissioning of contaminated facilities at Hanford  

SciTech Connect (OSTI)

In 1942 Hanford was commissioned as a site for the production of weapons-grade plutonium. The years since have seen the construction and operation of several generations of plutonium-producing reactors, plants for the chemical processing of irradiated fuel elements, plutonium and uranium processing and fabrication plants, and other facilities. There has also been a diversification of the Hanford site with the building of new laboratories, a fission product encapsulation plant, improved high-level waste management facilities, the Fast Flux test facility, commercial power reactors and commercial solid waste disposal facilities. Obsolescence and changing requirements will result in the deactivation or retirement of buildings, waste storage tanks, waste burial grounds and liquid waste disposal sites which have become contaminated with varying levels of radionuclides. This manual was established as a written repository of information pertinent to decommissioning planning and operations at Hanford. The Resource Book contains, in several volumes, descriptive information of the Hanford Site and general discussions of several classes of contaminated facilities found at Hanford. Supplementing these discussions are appendices containing data sheets on individual contaminated facilities and sites at Hanford. Twelve appendices are provided, corresponding to the twelve classes into which the contaminated facilities at Hanford have been organized. Within each appendix are individual data sheets containing administrative, geographical, physical, radiological, functional and decommissioning information on each facility within the class. 68 refs., 54 figs., 18 tabs.

Not Available

1991-09-01T23:59:59.000Z

355

EA-1889-FEA-FONSI-2012.pdf  

Broader source: Energy.gov (indexed) [DOE]

UNITED STATES UNITED STATES DEPARTMENT OF THE NAVY FINAL ENVIRONMENTAL ASSESSMENT ON THE DISPOSAL OF DECOMMISSIONED, DEFUELED NAVAL REACTOR PLANTS FROM USS ENTERPRISE (CVN 65) AUGUST 2012 FINAL USS ENTERPRISE EA RESPONSIBLE AGENCIES: Lead Federal Agency: U.S. Department of the Navy Cooperating Agency: U.S. Department of Energy TITLE: Final Environmental Assessment on the Disposal of Decommissioned, Defueled, Naval Reactor Plants from USS ENTERPRISE (CVN 65) FINAL USS ENTERPRISE EA S-1 SUMMARY: The United States Navy proposes to remove the reactor compartments of USS ENTERPRISE (CVN 65), hereafter referred to as ENTERPRISE, at Puget Sound Naval Shipyard & Intermediate Maintenance Facility (PSNS & IMF), prepare the reactor compartments for disposal

356

Attrition reactor system  

DOE Patents [OSTI]

A reactor vessel for reacting a solid particulate with a liquid reactant has a centrifugal pump in circulatory flow communication with the reactor vessel for providing particulate attrition, resulting in additional fresh surface where the reaction can occur. 2 figures.

Scott, C.D.; Davison, B.H.

1993-09-28T23:59:59.000Z

357

Elementary Reactor Physics  

Science Journals Connector (OSTI)

... THERE are few subjects which have developed at the rate at which reactor physics and ... physics and reactor theory have done. This, of course, is largely due to the circumstances in ...

J. F. HILL

1962-02-10T23:59:59.000Z

358

Colliding Beam Fusion Reactors  

Science Journals Connector (OSTI)

The recirculating power for virtually all types of fusion reactors has previously been calculated [1] with the Fokker–Planck equation. The reactors involve non-Maxwellian plasmas. The calculations are ... the rec...

Norman Rostoker; Artan Qerushi; Michl Binderbauer

2003-06-01T23:59:59.000Z

359

Superfund record of decision (EOA Region 1): Newport Naval Education/Training Center, Newport, RI, September 1993  

SciTech Connect (OSTI)

The U.S. Naval Education and Training Center (NETC) Newport is a National Priorities List (NPL) site. There are currently four areas of contamination (AOC) and six study areas (SAs) within NETC Newport that are under investigation. This Record of Decision (ROD) relates to the presence of the existing landfill area at McAllister Point as a source of contamination. McAllister Point Landfill was the site of a sanitary landfill which operated over a 20-year period. From 1955 until the mid-1970's, the site accepted all wastes generated at the Naval complex. The landfill received waste from all operational areas (machine shops, ship repair, etc.), Navy housing areas (domestic refuse), and from the 55 ships homeported at Newport prior to 1973 (approximately fourteen 40-cubic yard containers each day). The materials disposed of at the site reportedly included spent acids, paints, solvents, waste oils (diesel, lube and fuel), and polychlorinated biphenyl (PCB)-contaminated transformer oil.

Not Available

1993-09-01T23:59:59.000Z

360

Generic small modular reactor plant design.  

SciTech Connect (OSTI)

This report gives an overview of expected design characteristics, concepts, and procedures for small modular reactors. The purpose of this report is to provide those who are interested in reducing the cost and improving the safety of advanced nuclear power plants with a generic design that possesses enough detail in a non-sensitive manner to give merit to their conclusions. The report is focused on light water reactor technology, but does add details on what could be different in a more advanced design (see Appendix). Numerous reactor and facility concepts were used for inspiration (documented in the bibliography). The final design described here is conceptual and does not reflect any proposed concept or sub-systems, thus any details given here are only relevant within this report. This report does not include any design or engineering calculations.

Lewis, Tom Goslee,; Cipiti, Benjamin B.; Jordan, Sabina Erteza; Baum, Gregory A.

2012-12-01T23:59:59.000Z

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

NREL: Wind Research - Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities Facilities Our facilities are designed to meet the wind industry's critical research needs with state-of-the-art design and testing facilities. NREL's unique and highly versatile facilities at the National Wind Technology Center offer research and analysis of wind turbine components and prototypes rated from 400 watts to 3 megawatts. Satellite facilities support the growth of wind energy development across the United States. National Wind Technology Center Facilities Our facilities are contained within a 305-acre area that comprises field test sites, test laboratories, industrial high-bay work areas, machine shops, electronics and instrumentation laboratories, and office areas. In addition, there are hundreds of test articles and supporting components such as turbines, meteorological towers, custom test apparatus, test sheds,

362

FACET User Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages

AD SLACPortal > Accelerator Research Division > FACET User Facility AD SLACPortal > Accelerator Research Division > FACET User Facility Sign In Launch the Developer Dashboard SLAC National Accelerator Laboratory DOE | Stanford | SLAC | SSRL | LCLS | AD | PPA | Photon Science | PULSE | SIMES FACET User Facility : FACET An Office of Science User Facility Search this site... Search Help (new window) Top Link Bar FACET User Facility FACET Home About FACET FACET Experimental Facilities FACET Users Research at FACET SAREC Expand SAREC FACET FAQs FACET User Facility Quick Launch FACET Users Home FACET Division ARD Home About FACET FACET News FACET Users FACET Experimental Facilities FACET Research Expand FACET Research FACET Images Expand FACET Images SAREC Expand SAREC FACET Project Site (restricted) FACET FAQs FACET Site TOC All Site Content

363

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

October 15, 2005 [Facility News] October 15, 2005 [Facility News] Room to Share-New Guest Facility Ready for Users at North Slope of Alaska Bookmark and Share In September, installation was completed on the new Guest Instrument Facility in Barrow to provide additional space and ease crowded conditions. In September, installation was completed on the new Guest Instrument Facility in Barrow to provide additional space and ease crowded conditions. To alleviate crowded conditions at its research facilities on the North Slope of Alaska (NSA) site in Barrow, ARM operations staff recently completed the installation of a new Guest Instrument Facility. Similar to the platform at the Atqasuk site, the facility consists of two insulated shipping containers mounted on pilings, with a mezzanine to accommodate

364

Jupiter Laser Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Jupiter Laser Facility The commissioning of the Titan Petawatt-Class laser to LLNL's Jupiter Laser Facility (JLF) has provided a unique platform for the use of petawatt (PW)-class...

365

Facilities | Jefferson Lab  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

JLab Buildings Facilities Management & Logistics is responsible for performing or specifying performance of all Jefferson Lab facility maintenance. A D D I T I O N A L L I N K S:...

366

Environmental Survey preliminary report, Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming, Casper, Wyoming  

SciTech Connect (OSTI)

This report presents the preliminary environmental findings from the first phase of the Environmental Survey of the United States Department of Energy (DOE) Naval Petroleum and Oil Shale Reserves in Colorado, Utah, and Wyoming (NPOSR-CUW) conducted June 6 through 17, 1988. NPOSR consists of the Naval Petroleum Reserve No. 3 (NPR-3) in Wyoming, the Naval Oil Shale Reserves No. 1 and 3 (NOSR-1 and NOSR-3) in Colorado and the Naval Oil Shale Reserve No. 2 (NOSR-2) in Utah. NOSR-2 was not included in the Survey because it had not been actively exploited at the time of the on-site Survey. The Survey is being conducted by an interdisciplinary team of environmental specialists, lead and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team specialists are outside experts being supplied by a private contractor. The objective of the Survey is to identify environmental problems and areas of environmental risk associated with NPOSR. The Survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the Survey involves the review of existing site environmental data, observations of the operations carried on at NPOSR and interviews with site personnel. The Survey team has developed a Sampling and Analysis Plan to assist in further assessing specific environmental problems identified at NOSR-3 during the on-site Survey. There were no findings associated with either NPR-3 or NOSR-1 that required Survey-related sampling and Analysis. The Sampling and Analysis Plan will be executed by Idaho National Engineering Laboratory. When completed, the results will be incorporated into the Environmental Survey Summary report. The Summary Report will reflect the final determinations of the NPOSR-CUW Survey and the other DOE site-specific Surveys. 110 refs., 38 figs., 24 tabs.

Not Available

1989-02-01T23:59:59.000Z

367

ORNL - Restart of the High Flux Isotope Reactor 2-07  

Broader source: Energy.gov (indexed) [DOE]

CONFIGURATION MANAGEMENT (CM) CONFIGURATION MANAGEMENT (CM) OBJECTIVE CM-1: The facility systems and procedures, as affected by the facility modifications, are consistent with the description of the facility, procedures, and accident analysis included in the safety basis. (Core Requirement 9) Criteria * The CS and reactor systems affected by the CS and facility modifications are consistent with the description and accident analysis included in the DSA. * The reactor and CS procedures (including system drawings, operating procedures, annunciator response procedures, abnormal operating procedures, emergency operating procedures, surveillance test procedures, and other procedures affected by the CS modification) are consistent with the description and accident analysis included in the DSAs.

368

Fission, Fusion Materials Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

is shown in illustration. Materials are the immediate priority of both the fission and fusion communities. Extending the lifetime of the current fleet of light water reactors...

369

Prospects for spheromak fusion reactors  

Science Journals Connector (OSTI)

The reactor study of Hagenson and Krakowski demonstrated the attractiveness of the spheromak as a compact fusion reactor, based on...

T. K. Fowler; D. D. Hua

1995-06-01T23:59:59.000Z

370

The digital preservation facility  

Science Journals Connector (OSTI)

Critical listening should be an essential part of all archiving and restoration facilities quality control. We review the priorities and requirements for listening spaces ranging from the individual collector and small community archives to large?scale facilities. Examples discussed include the Library of Congress Culpepper facility university libraries and commercial facilities. Adapting listening rooms to the requirements of n?channel audio are discussed. Public recommendations of the Sound Preservation Board of the Library of Congress will be reviewed.

2006-01-01T23:59:59.000Z

371

Sandia National Laboratories: Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

DETL, Energy, Facilities, Materials Science, News, News & Events, Photovoltaic, Renewable Energy, Research & Capabilities, Solar, Solar Newsletter, Systems Analysis Sandia...

372

ORAU South Campus Facility  

Broader source: Energy.gov [DOE]

This document explains the cleanup activities and any use limitations for the land surrounding the ORAU South Campus Facility.

373

DOE Designated Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Research Argonne Wakefield Accelerator (AWA) Argonne Tandem Linac Accelerator System (ATLAS) Center for Nanoscale Materials Leadership Computing Facility* Brookhaven National...

374

Advanced Test Reactor Tour  

SciTech Connect (OSTI)

The Advanced Test Reactor at Idaho National Laboratory is the foremost nuclear materials test reactor in the world. This virtual tour describes the reactor, how experiments are conducted, and how spent nuclear fuel is handled and stored. For more information about INL research, visit http://www.facebook.com/idahonationallaboratory.

Miley, Don

2011-01-01T23:59:59.000Z

375

Improved vortex reactor system  

DOE Patents [OSTI]

An improved vortex reactor system for affecting fast pyrolysis of biomass and Refuse Derived Fuel (RDF) feed materials comprising: a vortex reactor having its axis vertically disposed in relation to a jet of a horizontally disposed steam ejector that impels feed materials from a feeder and solids from a recycle loop along with a motive gas into a top part of said reactor.

Diebold, James P. (Lakewood, CO); Scahill, John W. (Evergreen, CO)

1995-01-01T23:59:59.000Z

376

Advanced Test Reactor Tour  

ScienceCinema (OSTI)

The Advanced Test Reactor at Idaho National Laboratory is the foremost nuclear materials test reactor in the world. This virtual tour describes the reactor, how experiments are conducted, and how spent nuclear fuel is handled and stored. For more information about INL research, visit http://www.facebook.com/idahonationallaboratory.

Miley, Don

2013-05-28T23:59:59.000Z

377

DATE  

Broader source: Energy.gov (indexed) [DOE]

0 0 SECTION A. Project Title: Test Reactor Cask Implementation. SECTION B. Project Description: This proposed action is a process and facility modification. Background / Purpose & Need The Advanced Test Reactor (ATR) uses the Naval Reactors (NR) Casks to transport test trains between the Naval Reactors Facility (NRF) Expended Core Facility and the ATR. The Naval Reactor (NR) Casks, however, are approaching the end of their design life. In 1997, Bettis initiated a contract for construction of the NR Cask replacement, the Test Reactor Cask (TRC). The TRC is a revised and updated design of the NR cask and will be more robust structurally and provide more shielding than the current NR Casks. Construction of two TRCs is nearly finished and the INL must now modify the ATR facility and update ATR safety

378

Action Memorandum for the Engineering Test Reactor under the Idaho Cleanup Project  

SciTech Connect (OSTI)

This Action Memorandum documents the selected alternative for decommissioning of the Engineering Test Reactor at the Idaho National Laboratory under the Idaho Cleanup Project. Since the missions of the Engineering Test Reactor Complex have been completed, an engineering evaluation/cost analysis that evaluated alternatives to accomplish the decommissioning of the Engineering Test Reactor Complex was prepared adn released for public comment. The scope of this Action Memorandum is to encompass the final end state of the Complex and disposal of the Engineering Test Reactor vessol. The selected removal action includes removing and disposing of the vessel at the Idaho CERCLA Disposal Facility and demolishing the reactor building to ground surface.

A. B. Culp

2007-01-26T23:59:59.000Z

379

Wheelabrator Bridgeport Biomass Facility | Open Energy Information  

Open Energy Info (EERE)

Wheelabrator Bridgeport Biomass Facility Jump to: navigation, search Name Wheelabrator Bridgeport Biomass Facility Facility Wheelabrator Bridgeport Sector Biomass Facility Type...

380

Research reactor usage at the Idaho National Engineering Laboratory in support of university research and education  

SciTech Connect (OSTI)

The Idaho National Engineering Laboratory is a US Department of Energy laboratory which has a substantial history of research and development in nuclear reactor technologies. There are a number of available nuclear reactor facilities which have been incorporated into the research and training needs of university nuclear engineering programs. This paper addresses the utilization of the Advanced Reactivity Measurement Facility (ARMF) and the Coupled Fast Reactivity Measurement Facility (CFRMF) for thesis and dissertation research in the PhD program in Nuclear Science and Engineering by the University of Idaho and Idaho State University. Other reactors at the INEL are also being used by various members of the academic community for thesis and dissertation research, as well as for research to advance the state of knowledge in innovative nuclear technologies, with the EBR-II facility playing an essential role in liquid metal breeder reactor research. 3 refs.

Woodall, D.M.; Dolan, T.J.; Stephens, A.G. (Idaho National Engineering Lab., Idaho Falls, ID (USA))

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Final joint environmental assessment for the construction and routine operation of a 12-kilovolt (KV) overhead powerline right-of-way, and formal authorization for a 10-inch and 8-inch fresh water pipeline right-of-way, Naval Petroleum Reserve No. 1, Kern County, California  

SciTech Connect (OSTI)

The purpose and need of the proposed action, which is the installation of an overhead powerline extension from an Naval Petroleum Reserve No. 1 (NPR-1) power source to the WKWD Station A, is to significantly reduce NPR-1`s overall utility costs. While the proposed action is independently justified on its own merits and is not tied to the proposed NPR-1 Cogeneration Facility, the proposed action would enable DOE to tie the NPR-1 fresh water pumps at Station A into the existing NPR-1 electrical distribution system. With the completion of the cogeneration facility in late 1994 or early 1995, the proposed action would save additional utility costs. This report deals with the environmental impacts of the construction of the powerline and the water pipeline. In addition, information is given about property rights and attaining permission to cross the property of proposed affected owners.

Not Available

1994-10-01T23:59:59.000Z

382

The Argonaut Reactor - Reactors designed/built by Argonne National  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Achievements > Achievements > Argonne Reactors > Training Reactors About Director's Welcome Organization Achievements Highlights Fact Sheets, Brochures & Other Documents Multimedia Library Visit Argonne Work with Argonne Contact us Nuclear Energy Why Nuclear Energy? Why are some people afraid of Nuclear Energy? How do nuclear reactors work? Cheaper & Safer Nuclear Energy Helping to Solve the Nuclear Waste Problem Nuclear Reactors Nuclear Reactors Early Exploration Training Reactors Basic and Applied Science Research LWR Technology Development BORAX-III lighting Arco, Idaho (Press Release) Heavy Water and Graphite Reactors Fast Reactor Technology Integral Fast Reactor Argonne Reactor Tree CP-1 70th Anniversary CP-1 70th Anniversary Argonne's Nuclear Science and Technology Legacy

383

Final sitewide environmental assessment for preparation for transfer of ownership of Naval Petroleum Reserve No. 3 (NPR-3), Natrona County, Wyoming  

SciTech Connect (OSTI)

The Secretary of Energy is authorized to produce the Naval Petroleum Reserves No. 3 (NPR-3) at its maximum efficient rate (MER) consistent with sound engineering practices, for a period extending to April 5, 2000 subject to extension. Production at NPR-3 peaked in 1981 and has declined since until it has become a mature stripper field, with the average well yielding less than 2 barrels per day. The Department of Energy (DOE) has decided to discontinue Federal operation of NPR-3 at the end of its life as an economically viable oilfield currently estimated to be 2003. Although changes in oil and gas markets or shifts in national policy could alter the economic limit of NPR-3, it productive life will be determined largely by a small and declining reserve base. DOE is proposing certain activities over the next six years in anticipation of the possible transfer of NPR-3 out of Federal operation. These activities would include the accelerated plugging and abandoning of uneconomic wells, complete reclamation and restoration of abandoned sites including dismantling surface facilities, batteries, roads, test satellites, electrical distribution systems and associated power poles, when they are no longer needed for production, and the continued development of the Rocky Mountain Oilfield Testing Center (RMOTC). DOE has prepared this environmental assessment that analyzes the proposed plugging and abandonment of wells, field restoration and development of RMOTC. Based on the analysis in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). The preparation of an environmental impact statement is not required, and DOE is issuing this Finding of No Significant Impact (FONSI).

NONE

1998-04-01T23:59:59.000Z

384

DECONTAMINATION TECHNOLOGIES FOR FACILITY REUSE  

SciTech Connect (OSTI)

As nuclear research and production facilities across the U.S. Department of Energy (DOE) nuclear weapons complex are slated for deactivation and decommissioning (D&D), there is a need to decontaminate some facilities for reuse for another mission or continued use for the same mission. Improved technologies available in the commercial sector and tested by the DOE can help solve the DOE's decontamination problems. Decontamination technologies include mechanical methods, such as shaving, scabbling, and blasting; application of chemicals; biological methods; and electrochemical techniques. Materials to be decontaminated are primarily concrete or metal. Concrete materials include walls, floors, ceilings, bio-shields, and fuel pools. Metallic materials include structural steel, valves, pipes, gloveboxes, reactors, and other equipment. Porous materials such as concrete can be contaminated throughout their structure, although contamination in concrete normally resides in the top quarter-inch below the surface. Metals are normally only contaminated on the surface. Contamination includes a variety of alpha, beta, and gamma-emitting radionuclides and can sometimes include heavy metals and organic contamination regulated by the Resource Conservation and Recovery Act (RCRA). This paper describes several advanced mechanical, chemical, and other methods to decontaminate structures, equipment, and materials.

Bossart, Steven J.; Blair, Danielle M.

2003-02-27T23:59:59.000Z

385

Facility Representative Program: 2004 Facility Representative Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4 Facility Representative Workshop 4 Facility Representative Workshop May 18 - 20, 2004 Las Vegas, NV Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Final Day 1: Tuesday, May 18, 2004 Theme: Program Successes and Challenges 8:00 a.m. Opening Remarks John Evans, Facility Representative Program Manager 8:15 a.m. Welcome Kathy Carlson, Nevada Site Office Manager 8:30 a.m. Videotaped Remarks from the Deputy Secretary Kyle E. McSlarrow, Deputy Secretary of Energy Deputy Secretary's Remarks 8:40 a.m. Keynote Address - NNSA Evaluation of Columbia Accident Investigation Board Report Brigadier General Ronald J. Haeckel, Principal Assistant Deputy Administrator for Military Applications, NNSA Other Information: NASA’S Columbia Accident Investigation Board Report

386

Facility Representative Program: 2006 Facility Representative Workshop  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6 Facility Representative Workshop 6 Facility Representative Workshop May 16 - 19, 2006 Knoxville, Tennessee Facility Rep of the Year Award | Attendees list | Summary Report [PDF] WORKSHOP AGENDA Final To view Pictures, scroll the mouse over the Picture icon To view Presentations, Picture Slideshows and Video, click on the icon Day 1: Tuesday, May 16, 2006 8:00 a.m. Opening Remarks John Evans, Facility Representative Program Manager 8:15 a.m. Welcome from Oak Ridge Office Gerald Boyd, Manager, Oak Ridge Office 8:25 a.m. Welcome from Y-12 Site Office Theodore Sherry, Manager, Y-12 Site Office 8:35 a.m. Videotaped Remarks from the Deputy Secretary The Honorable Clay Sell, Deputy Secretary of Energy 8:40 a.m. Keynote Address - Safety Oversight at Environmental Management Activities Dr. Inés Triay, Chief Operating Officer, Office of Environmental Management

387

Nuclear reactors built, being built, or planned 1992  

SciTech Connect (OSTI)

Nuclear Reactors Built, Being Built, or Planned contains unclassified information about facilities built, being built, or planned in the United States for domestic use or export as of December 31, 1992. The Office of Scientific and Technical Information, US Department of Energy, gathers this information annually from Washington headquarters and field offices of DOE from the US Nuclear Regulatory Commission (NRC); from the US reactor manufacturers who are the principal nuclear contractors for foreign reactor locations; from US and foreign embassies; and from foreign governmental nuclear departments. Information is presented on five parts: Civilian, Production, Military, Export and Critical Assembly.

Not Available

1993-07-01T23:59:59.000Z

388

Reactor vessel support system  

DOE Patents [OSTI]

A reactor vessel support system includes a support ring at the reactor top supported through a box ring on a ledge of the reactor containment. The box ring includes an annular space in the center of its cross-section to reduce heat flow and is keyed to the support ledge to transmit seismic forces from the reactor vessel to the containment structure. A coolant channel is provided at the outside circumference of the support ring to supply coolant gas through the keyways to channels between the reactor vessel and support ledge into the containment space.

Golden, Martin P. (Trafford, PA); Holley, John C. (McKeesport, PA)

1982-01-01T23:59:59.000Z

389

NREL: Buildings Research - Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities Facilities NREL provides industry, government, and university researchers with access to state-of-the-art and unique equipment for analyzing a wide spectrum of building energy efficiency technologies and innovations. NREL engineers and researchers work closely with industry partners to research and develop advanced technologies. NREL's existing facilities have been used to test and develop many award-winning building technologies and innovations that deliver significant energy savings in buildings, and the new facilities further extend those capabilities. In addition, the NREL campus includes living laboratories, buildings that researchers and other NREL staff use every day. Researchers monitor real-time building performance data in these facilities to study energy use

390

Idaho National Laboratory Advanced Test Reactor Probabilistic Risk  

Broader source: Energy.gov (indexed) [DOE]

Idaho National Laboratory Advanced Test Reactor Probabilistic Risk Idaho National Laboratory Advanced Test Reactor Probabilistic Risk Assessment Idaho National Laboratory Advanced Test Reactor Probabilistic Risk Assessment September 19, 2012 Presenter: Bentley Harwood, Advanced Test Reactor Nuclear Safety Engineer Battelle Energy Alliance Idaho National Laboratory Topics covered: PRA studies began in the late 1980s 1989, ATR PRA published as a summary report 1991, ATR PRA full report 1994 and 2004 various model changes 2011, Consolidation, update and improvement of previous PRA work 2012/2013, PRA risk monitor implementation Idaho National Laboratory Advanced Test Reactor Probabilistic Risk Assessment More Documents & Publications DOE's Approach to Nuclear Facility Safety Analysis and Management Nuclear Regulatory Commission Handling of Beyond Design Basis Events for

391

Light Water Reactors [Corrosion and Mechanics of Materials] - Nuclear  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Light Water Reactors Light Water Reactors Capabilities Materials Testing Environmentally Assisted Cracking (EAC) of Reactor Materials Corrosion Performance/Metal Dusting Overview Light Water Reactors Fatigue Testing of Carbon Steels and Low-Alloy Steels Environmentally Assisted Cracking of Ni-Base Alloys Irradiation-Induced Stress Corrosion Cracking of Austenitic Stainless Steels Steam Generator Tube Integrity Program Air Oxidation Kinetics for Zr-based Alloys Fossil Energy Fusion Energy Metal Dusting Publications List Irradiated Materials Steam Generator Tube Integrity Other Facilities Work with Argonne Contact us For Employees Site Map Help Join us on Facebook Follow us on Twitter NE on Flickr Corrosion and Mechanics of Materials Light Water Reactors Bookmark and Share To continue safe operation of current LWRs, the aging degradation of the

392

CRAD, Engineering - Oak Ridge National Laboratory High Flux Isotope Reactor  

Broader source: Energy.gov (indexed) [DOE]

Engineering - Oak Ridge National Laboratory High Flux Isotope Engineering - Oak Ridge National Laboratory High Flux Isotope Reactor CRAD, Engineering - Oak Ridge National Laboratory High Flux Isotope Reactor February 2007 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Engineering Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Engineering - Oak Ridge National Laboratory High Flux Isotope Reactor More Documents & Publications CRAD, Engineering - Oak Ridge National Laboratory High Flux Isotope Reactor

393

CRAD, Training - Oak Ridge National Laboratory High Flux Isotope Reactor  

Broader source: Energy.gov (indexed) [DOE]

Reactor Contractor ORR Reactor Contractor ORR CRAD, Training - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR February 2007 A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Training Program portion of an Operational Readiness Review of the Oak Ridge National Laboratory High Flux Isotope Reactor. CRADs provide a recommended approach and the types of information to gather to assess elements of a DOE contractor's programs. CRAD, Training - Oak Ridge National Laboratory High Flux Isotope Reactor Contractor ORR More Documents & Publications CRAD, Conduct of Operations - Oak Ridge National Laboratory High Flux

394

Facility Name Facility Name Facility FacilityType Owner Developer EnergyPurchaser  

Open Energy Info (EERE)

Name Facility Name Facility FacilityType Owner Developer EnergyPurchaser Name Facility Name Facility FacilityType Owner Developer EnergyPurchaser Place GeneratingCapacity NumberOfUnits CommercialOnlineDate WindTurbineManufacturer FacilityStatus Coordinates D Metals D Metals D Metals Definition Small Scale Wind Valley City OH MW Northern Power Systems In Service AB Tehachapi Wind Farm AB Tehachapi Wind Farm AB Tehachapi Definition Commercial Scale Wind Coram Energy AB Energy Southern California Edison Co Tehachapi CA MW Vestas In Service AFCEE MMR Turbines AFCEE MMR Turbines AFCEE MMR Turbines Definition Commercial Scale Wind AFCEE Air Force Center for Engineering and the Environment Distributed generation net metered Camp Edwards Sandwich MA MW GE Energy In Service AG Land AG Land AG Land Definition Community Wind AG Land Energy LLC

395

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

March 22, 2007 [Facility News] March 22, 2007 [Facility News] GEWEX News Features Dust Data from ARM Mobile Facility Deployment Bookmark and Share Data from the recent deployment of the ARM Mobile Facility are featured in the February issue of GEWEX News. Data from the recent deployment of the ARM Mobile Facility are featured in the February issue of GEWEX News. The February 2007 issue (Vol. 17, No. 1) of GEWEX News features early results from special observing periods of the African Monsoon Mutidisciplinary Analysis, including data obtained by the ARM Mobile Facility (AMF). The AMF was stationed in the central Sahel from January through December 2006, with the primary facility at the Niamey airport, and an ancillary site in Banizoumbou. The AMF recorded a major dust storm that passed through the area in March, and combined with simultaneous satellite

396

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

February 16, 2005 [Facility News] February 16, 2005 [Facility News] Mobile Facility Arrives Safe and Sound in Point Reyes Bookmark and Share Image - The ARM Mobile Facility in Point Reyes, California Image - The ARM Mobile Facility in Point Reyes, California Safe and sound at Point Reyes, the ARM Mobile Facility instrumentation is set up on the roof of a shelter until a fence is installed to keep out the curious local cattle. On February 9, the ARM Mobile Facility (AMF) withstood an accident on the way to its deployment location at Point Reyes, California. About an hour from its destination, the truck carrying the two AMF shelters packed with instrumentation and associated equipment swerved to avoid another vehicle and slid off the road and down a steep embankment. Emergency personnel soon

397

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

22, 2011 [Facility News] 22, 2011 [Facility News] Request for Proposals Now Open Bookmark and Share The ARM Climate Research Facility is now accepting applications for use of an ARM mobile facility (AMF), the ARM aerial facility (AAF), and fixed sites. Proposals are welcome from all members of the scientific community for conducting field campaigns and scientific research using the ARM Facility, with availability as follows: AMF2 available December 2013 AMF1 available March 2015 AAF available between June and October 2013 Fixed sites available FY2013 Priority will be given to proposals that make comprehensive use of the ARM facilities and focus on long-term goals of the DOE Office of Biological and Environmental Research. Successful proposals will be supplied all operational and logistical resources (provided at no cost to the principal

398

Reactor water cleanup system  

DOE Patents [OSTI]

A reactor water cleanup system includes a reactor pressure vessel containing a reactor core submerged in reactor water. First and second parallel cleanup trains are provided for extracting portions of the reactor water from the pressure vessel, cleaning the extracted water, and returning the cleaned water to the pressure vessel. Each of the cleanup trains includes a heat exchanger for cooling the reactor water, and a cleaner for cleaning the cooled reactor water. A return line is disposed between the cleaner and the pressure vessel for channeling the cleaned water thereto in a first mode of operation. A portion of the cooled water is bypassed around the cleaner during a second mode of operation and returned through the pressure vessel for shutdown cooling.

Gluntz, Douglas M. (San Jose, CA); Taft, William E. (Los Gatos, CA)

1994-01-01T23:59:59.000Z

399

Reactor water cleanup system  

DOE Patents [OSTI]

A reactor water cleanup system includes a reactor pressure vessel containing a reactor core submerged in reactor water. First and second parallel cleanup trains are provided for extracting portions of the reactor water from the pressure vessel, cleaning the extracted water, and returning the cleaned water to the pressure vessel. Each of the cleanup trains includes a heat exchanger for cooling the reactor water, and a cleaner for cleaning the cooled reactor water. A return line is disposed between the cleaner and the pressure vessel for channeling the cleaned water thereto in a first mode of operation. A portion of the cooled water is bypassed around the cleaner during a second mode of operation and returned through the pressure vessel for shutdown cooling. 1 figure.

Gluntz, D.M.; Taft, W.E.

1994-12-20T23:59:59.000Z

400

INTEGRATION OF FACILITY MODELING CAPABILITIES FOR NUCLEAR NONPROLIFERATION ANALYSIS  

SciTech Connect (OSTI)

Developing automated methods for data collection and analysis that can facilitate nuclear nonproliferation assessment is an important research area with significant consequences for the effective global deployment of nuclear energy. Facility modeling that can integrate and interpret observations collected from monitored facilities in order to ascertain their functional details will be a critical element of these methods. Although improvements are continually sought, existing facility modeling tools can characterize all aspects of reactor operations and the majority of nuclear fuel cycle processing steps, and include algorithms for data processing and interpretation. Assessing nonproliferation status is challenging because observations can come from many sources, including local and remote sensors that monitor facility operations, as well as open sources that provide specific business information about the monitored facilities, and can be of many different types. Although many current facility models are capable of analyzing large amounts of information, they have not been integrated in an analyst-friendly manner. This paper addresses some of these facility modeling capabilities and illustrates how they could be integrated and utilized for nonproliferation analysis. The inverse problem of inferring facility conditions based on collected observations is described, along with a proposed architecture and computer framework for utilizing facility modeling tools. After considering a representative sampling of key facility modeling capabilities, the proposed integration framework is illustrated with several examples.

Gorensek, M.; Hamm, L.; Garcia, H.; Burr, T.; Coles, G.; Edmunds, T.; Garrett, A.; Krebs, J.; Kress, R.; Lamberti, V.; Schoenwald, D.; Tzanos, C.; Ward, R.

2011-07-18T23:59:59.000Z

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Impacts of criticality safety on hot fuel examination facility operations  

SciTech Connect (OSTI)

The Hot Fuel Examination Facility (HFEF) complex comprises four large hot cells. These cells are used to support the nation's nuclear energy program, especially the liquid-metal fast breeder reactor, by providing nondestructive and destructive testing of irradiated reactor fuels and furnishing the hot cell services required for operation of Experimental Breeder Reactor II (EBR-II). Because it is a research rather than a production facility, HFEF assignments are varied and change from time to time to meet the requirements of our experimenters. Such a variety of operations presents many challenges, especially for nuclear criticality safety. The following operations are reviewed to assure that accidental criticality is not possible, and that all rules and regulations are met: transportation, temporary storage, examinations, and disposition.

Garcia, A.S.; Courtney, J.C.; Bacca, J.P.

1985-11-01T23:59:59.000Z

402

Economic Evaluation of Nuclear Reactor Coupling with Seawater Desalination Facility  

SciTech Connect (OSTI)

Nowadays only 1/2000 of overall fresh water resource can be used in the world, 1.1 billion people in the world are short of safety drinkable water, so the supply of freshwater is one of the major problems facing to the world in 21. century. China is one of the thirteen water-poorest countries and fresh water has become a choke point of the economic development in those water-poor regions. The desalination of sea water is a very important way to find new fresh water resource and sea water is inexhaustible. (authors)

Danrong Song; Tong Liu; Hua Zhao [Nuclear power institute of china (China)

2006-07-01T23:59:59.000Z

403

The Operation of the Tokamak Fusion Test Reactor Tritium Facility  

Science Journals Connector (OSTI)

Design, Operation, and Maintenance of Tritium System / Proceedings of the Fifth Topical Meeting on Tritium Technology In Fission, Fusion, and Isotopic Applications Belgirate, Italy May 28-June 3, 1995

Charles A. Gentile; James L. Anderson; Paul H. LaMarche

404

224-T Facility - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

T Facility Projects & Facilities 100 Area 118-K-1 Burial Ground 200 Area 209-E Critical Mass Laboratory 222-S Laboratory 224-B Facility 224-T Facility 242-A Evaporator 300 Area 324...

405

Cold Test Facility - Hanford Site  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Projects & Facilities > Cold Test Facility Projects & Facilities 100 Area 118-K-1 Burial Ground 200 Area 209-E Critical Mass Laboratory 222-S Laboratory 224-B Facility 224-T...

406

RMOTCTrainingFacilityNEW.doc  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

* Field Laboratory with surface outcrops of Cretaceous fluvial and marine units * Gas Processing Facilities * Production Facilities * Tanks & Pipelines * Aquaculture &...

407

Solar Thermal Reactor Materials Characterization  

SciTech Connect (OSTI)

Current research into hydrogen production through high temperature metal oxide water splitting cycles has created a need for robust high temperature materials. Such cycles are further enhanced by the use of concentrated solar energy as a power source. However, samples subjected to concentrated solar radiation exhibited lifetimes much shorter than expected. Characterization of the power and flux distributions representative of the High Flux Solar Furnace(HFSF) at the National Renewable Energy Laboratory(NREL) were compared to ray trace modeling of the facility. In addition, samples of candidate reactor materials were thermally cycled at the HFSF and tensile failure testing was performed to quantify material degradation. Thermal cycling tests have been completed on super alloy Haynes 214 samples and results indicate that maximum temperature plays a significant role in reduction of strength. The number of cycles was too small to establish long term failure trends for this material due to the high ductility of the material.

Lichty, P. R.; Scott, A. M.; Perkins, C. M.; Bingham, C.; Weimer, A. W.

2008-03-01T23:59:59.000Z

408

Integrated Safety Analysis: Why It Is Appropriate for Fuel Recycling Facilities  

Broader source: Energy.gov (indexed) [DOE]

Integrated Safety Analysis: Why It Is Appropriate for Fuel Recycling Facilities Executive Summary This paper addresses why the use of an Integrated Safety Analysis ("ISA") is appropriate for fuel recycling facilities 1 which would be licensed under new regulations currently being considered by NRC. The use of the ISA for fuel facilities under Part 70 is described and compared to the use of a Probabilistic Risk Assessment ("PRA") for reactor facilities. A basis is provided for concluding that future recycling facilities - which will possess characteristics similar to today's fuel cycle facilities and distinct from reactors - can best be assessed using established qualitative or semi-quantitative ISA techniques to achieve and demonstrate safety in an effective and efficient manner.

409

Endangered species and cultural resources program, Naval Petroleum Reserves in California: Annual report FY95  

SciTech Connect (OSTI)

In FY95, EG and G Energy Measurements, Inc. (EG and G/EM) continued to support efforts to protect endangered species and cultural resources at the Naval Petroleum Reserves in California (NPRC). These efforts are conducted to ensure NPRC compliance with regulations regarding the protection of listed species and cultural resources on Federal properties. Population monitoring activities are conducted annually for San Joaquin kit foxes, giant kangaroo rats, blunt-nosed leopard lizards, and Hoover`s wooly-star. To mitigate impacts of oil field activities on listed species, 674 preactivity surveys covering approximately 211 hectares (521 acres) were conducted in FY95. EG and G/EM also assisted with mitigating effects from third-party projects, primarily by conducting biological and cultural resource consultations with regulatory agencies. EG and G/EM has conducted an applied habitat reclamation program at NPRC since 1985. In FY95, an evaluation of revegetation rates on reclaimed and non-reclaimed disturbed lands was completed, and the results will be used to direct future habitat reclamation efforts at NPRC. In FY95, reclamation success was monitored on 50 sites reclaimed in 1985. An investigation of factors influencing the distribution and abundance of kit foxes at NPRC was initiated in FY94. Factors being examined include habitat disturbance, topography, grazing, coyote abundance, lagomorph abundance, and shrub density. This investigation continued in FY95 and a manuscript on this topic will be completed in FY96. Also, Eg and G/EM completed collection of field data to evaluate the effects of a well blow-out on plant and animal populations. A final report will be prepared in FY96. Finally, EG and G/EM completed a life table analysis on San Joaquin kit foxes at NPRC.

NONE

1996-04-01T23:59:59.000Z

410

Human health risk assessment for off-shore media at Portsmouth Naval Shipyard  

SciTech Connect (OSTI)

A human health risk assessment for off-shore media was performed at the Portsmouth Naval Shipyard, Kittery, Maine. The purpose was to determine whether any potential human health risks could be posed by exposures to the estuary. Included in the study were the evaluations of potential risks existing from human exposures to surface water and sediment, as well as potential risks posed by ingestion of various species of fish and shellfish which are caught commercially and recreationally in the estuary. Three species were chosen for study. They were lobsters, mussels, and flounder. The USEPA prescribed protocols for performing human health risk assessments under CERCLA and RCRA were followed to estimate risks associated with ingestion of these species caught in the lower estuary, in the vicinity of the Shipyard. USEPA required the evaluation of two potential seafood ingestion scenarios recreational fishermen and subsistence fishermen. The results indicated that the USEPA risk target of 10{sup {minus}6} for carcinogens or the hazard index of one was exceeded in at least one species for the subsistence ingestion scenario for some inorganics and organic compounds. Based on these results, it was necessary to propose Media Protection Standards in the biota, which would represent the USEPA target risk level for carcinogens and noncarcinogens, as potential cleanup targets. In performing this task, a review of regional background levels for these chemicals found in biota throughout the Great Bay Estuarine System, at locations removed from the Shipyard, was performed. Also examined were regional Maine data from the NOAA Mussel Watch Program. Biota concentrations near the Shipyard were found to be within the range of biota concentrations for most of these chemicals throughout the region, suggesting possible multiple, non-point sources for the contaminants found in seafood throughout the region.

Mahoney, E. [Eileen Mahoney Associates, Inc., Philadelphia, PA (United States)

1995-12-31T23:59:59.000Z

411

Use of microbes for paraffin cleanup at Naval Petroleum Reserve No. 3  

SciTech Connect (OSTI)

Naval Petroleum Reserve No. 3 (NPR-3), also known as Teapot Dome, is a government-owned oil field in Natrona County, Wyoming. It is an asymmetrical anticline located on the western edge of the Powder River Basin, just south of the Salt Creek Anticline. Production started in 1922, and today the field is a marginally economic stripper field with average production of less than 3 BOPD (0.5 m{sup 3}/D) per well. Total field production is about 1,800 BOPD (286 m{sup 3}/D). The Second Wall Creek Formation was waterflooded from 1979 until June 1992 with poor results due to the extensive natural fracture system in this sandstone unit. Since water injection ceased, reservoir pressure has declined to very low levels. Liquids extraction and reinjection of the gas produced from high-GOR wells along the gas-oil contact continues, but the average gas cap pressure has fallen to approximately 150 psi (1.03 MPa) from an original pressure of 1,120 psi (7.72 MPa). Since the oil is highly paraffinic, wax deposition in the hydraulic fractures and the perforations has become a serious production problem. Microbial treatment was considered as a possible low-cost solution. Four wells were selected in the Second Wall Creek Reservoir with severe paraffin problems and production rates high enough to economically justify the treatment. Problems were experienced with the production of thick oil after approximately three months. This was interpreted to be a result of previously immobile paraffin being cleaned up. A slight decrease in the decline rate was seen in the wells, although some external factors cloud the interpretation. Microbial treatments were discontinued because of marginal economics. Three of the four wells produced additional oil and had a positive incremental cash flow. Oil viscosity tests did indicate that some positive microbial thinning was occurring, and changes to the treatment procedure may potentially yield more economic results in the future.

Giangiacomo, L.; Khatib, A.

1995-12-31T23:59:59.000Z

412

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

July 31, 2009 [Facility News] July 31, 2009 [Facility News] President of the Regional Government Speaks at Opening Ceremony for Mobile Facility in the Azores Bookmark and Share Highlighting the opening ceremony for the ARM Mobile Facility on Graciosa Island, Carlos César, President of the Regional Government of the Azores, signs a weather balloon while local media record the event. Photo by Mike Alsop. Highlighting the opening ceremony for the ARM Mobile Facility on Graciosa Island, Carlos César, President of the Regional Government of the Azores, signs a weather balloon while local media record the event. Photo by Mike Alsop. On June 30, officials from the Regional Government of the Azores recognized the deployment of the ARM Mobile Facility on Graciosa Island during an official opening ceremony held at the site. Notable among the participants

413

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

6, 2012 [Facility News] 6, 2012 [Facility News] News Tips from 2012 EGU General Assembly Bookmark and Share The ARM Facility is attending the 2012 European Geophysical Union General Assembly at the Austria Center in Vienna for the first time. The ARM Facility is attending the 2012 European Geophysical Union General Assembly at the Austria Center in Vienna for the first time. VIENNA - The U.S. Department of Energy's Atmospheric Radiation Measurement (ARM) Climate Research Facility is the world's most comprehensive outdoor laboratory and data archive for research related to atmospheric processes that affect Earth's climate. At the European Geophysical Union (EGU) General Assembly 2012 in Vienna, find out how scientists use the ARM Facility to study the interactions between clouds,

414

BNL | Accelerator Test Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Accelerator Test Facility Accelerator Test Facility Home Core Capabilities Photoinjector S-Band Linac Laser Systems CO2 Laser Nd:Yag Laser Beamlines Beamline Simulation Data Beamline Parameters Beam Diagnostics Detectors Beam Schedule Operations Resources Fact Sheet (.pdf) Image Library Upgrade Proposal (.pdf) Publications ES&H Experiment Start-up ATF Handbook Laser Safety Collider-Accelerator Dept. C-AD ES&H Resources Staff Users' Place Apply for Access ATF photo ATF photo ATF photo ATF photo ATF photo A user facility for advanced accelerator research The Brookhaven Accelerator Test Facility (ATF) is a proposal driven, steering committee reviewed facility that provides users with high-brightness electron- and laser-beams. The ATF pioneered the concept of a user facility for studying complex properties of modern accelerators and

415

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8, 2011 [Facility News, Publications] 8, 2011 [Facility News, Publications] Journal Special Issue Includes Mobile Facility Data from Germany Bookmark and Share The ARM Mobile Facility operated in Heselbach, Germany, as part of the COPS surface network. The ARM Mobile Facility operated in Heselbach, Germany, as part of the COPS surface network. In 2007, the ARM Mobile Facility participated in one of the most ambitious field studies ever conducted in Europe-the Convective and Orographically Induced Precipitation Study (COPS). Now, 21 papers published in a special issue of the Quarterly Journal of the Royal Meteorological Society demonstrate that the data collected during COPS are providing new insight into: the key chemical and physical processes leading to convection initiation and to the modification of precipitation by orography;

416

WIPP - Public Reading Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Public Reading Facilities/Electronic Reading Facilities The Freedom of Information Act (FOIA) and Electronic FOIA (E-FOIA) require that various specific types of records, as well as various other records, be maintained in public reading facilities. Before you submit a FOIA request, we recommend you contact or visit the appropriate public reading facility to determine if the records you are seeking have already been released. The U.S. Department of Energy (DOE), as well as other related DOE sites, have established home pages on the Internet with links to other web sites. If you determine a specific facility might have records in which you are interested, requests for those records can be made directly to the public reading rooms identified below. Copying of records located in the public reading rooms must be made by the staff of those facilities.

417

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

15, 2005 [Facility News] 15, 2005 [Facility News] Aging, Overworked Computer Network at SGP Gets Overhauled Bookmark and Share This aerial map of instruments deployed at the SGP Central Facility provides an indication of the computer resources needed to manage data at the site, let alone communicate with other ARM sites. This aerial map of instruments deployed at the SGP Central Facility provides an indication of the computer resources needed to manage data at the site, let alone communicate with other ARM sites. Established as the first ARM research facility in 1992, the Southern Great Plains (SGP) site in Oklahoma is the "old man on the block" when it comes to infrastructure. Though significant improvements have been made to facilities and equipment throughout the years, the computer network at the

418

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 7, 2011 [Facility News] April 7, 2011 [Facility News] Review Panel States ARM Facility "Without Peer" Bookmark and Share Every three years, DOE Office of Science user facilities undergo a review to evaluate their effectiveness in contributing to their respective science areas. The latest ARM Facility review was conducted in mid-February by a six-member review panel led by Minghua Zhang of Stony Brook University. Notably, in a debriefing following the review, the panel stated that ARM was a "world class facility without peer." The panel convened in Ponca City, Oklahoma, near ARM's Southern Great Plains site to conduct their review. Their first agenda item was an SGP site tour, which provided a realtime example of the scope and expertise of site operations and included a demonstration of the site's newly

419

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

8, 2010 [Facility News] 8, 2010 [Facility News] Europeans Keen to Hear About Effects of Dust Using Data from Africa Bookmark and Share In 2006, the ARM Mobile Facility joined the AMMA project to obtain data for scientists to study the impact that airborne Saharan dust has on incoming solar radiation. This photo shows the sun setting through a dusty atmosphere near Niamey, Niger, where the mobile facility was deployed for one year. In 2006, the ARM Mobile Facility joined the AMMA project to obtain data for scientists to study the impact that airborne Saharan dust has on incoming solar radiation. This photo shows the sun setting through a dusty atmosphere near Niamey, Niger, where the mobile facility was deployed for one year. Researcher Xiaohong Liu from Pacific Northwest National Laboratory was

420

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

April 30, 2008 [Facility News] April 30, 2008 [Facility News] Team Scouts Graciosa Island for 2009 Mobile Facility Deployment Site Bookmark and Share A location near the airport on the northern end of Graciosa Island was identified as an excellent location for operating the ARM Mobile Facility. Image source: Luis Miguens A location near the airport on the northern end of Graciosa Island was identified as an excellent location for operating the ARM Mobile Facility. Image source: Luis Miguens Indications from a scouting trip by the ARM Mobile Facility (AMF) science and operations management team are that an excellent site for the 2009 deployment may have been found. From April 8 through April 16, the team traveled to Graciosa Island in the Azores to scout sites for the Clouds, Aerosol, and Precipitation in the Marine Boundary Layer (CAP-MBL) field

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

340 Facility compliance assessment  

SciTech Connect (OSTI)

This study provides an environmental compliance evaluation of the RLWS and the RPS systems of the 340 Facility. The emphasis of the evaluation centers on compliance with WAC requirements for hazardous and mixed waste facilities, federal regulations, and Westinghouse Hanford Company (WHC) requirements pertinent to the operation of the 340 Facility. The 340 Facility is not covered under either an interim status Part A permit or a RCRA Part B permit. The detailed discussion of compliance deficiencies are summarized in Section 2.0. This includes items of significance that require action to ensure facility compliance with WAC, federal regulations, and WHC requirements. Outstanding issues exist for radioactive airborne effluent sampling and monitoring, radioactive liquid effluent sampling and monitoring, non-radioactive liquid effluent sampling and monitoring, less than 90 day waste storage tanks, and requirements for a permitted facility.

English, S.L. [Pacific Northwest Lab., Richland, WA (United States)

1993-10-01T23:59:59.000Z

422

Integrated Facilities Disposition Program  

Broader source: Energy.gov (indexed) [DOE]

Facilities Facilities Disposition Program Tank Waste Corporate Board Meeting at ORNL Sharon Robinson Dirk Van Hoesen Robert Jubin Brad Patton July 29, 2009 2 Managed by UT-Battelle for the U.S. Department of Energy The Integrated Facility Disposition Program (IFDP) addresses the remaining EM Scope at both ORNL and Y-12 Cost Range: $7 - $14B Schedule: 26 Years 3 Managed by UT-Battelle for the U.S. Department of Energy Scope of work * Treatment and disposition of legacy materials and waste * D&D 327 (1.5 M ft 2 ) excess facilities generating >2 M yd 3 debris * Soil and groundwater remedial actions generating >1 M yd 3 soils * Facilities surveillance and maintenance * Reconfiguration of waste management facilities * Ongoing waste management operations * Project management

423

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

4, 2013 [Facility News] 4, 2013 [Facility News] Work Cut Out for ARM Science Board Bookmark and Share With a new fixed site on the horizon in the Azores, a third ARM Mobile Facility gearing up for action in the Arctic, and more aircraft probes and sensors than scientists can shake a stick at, the ARM Facility continues to expand its considerable suite of assets for conducting climate research. Along with this impressive inventory comes the responsibility to ensure the Facility is supporting the highest-value science possible. Enter the ARM Science Board. This eleven-member group annually reviews complex proposals for use of the ARM mobile and aerial facilities. To maintain excellence and integrity in the review process, each member serves a renewable term of two years, with membership updated annually.

424

Poultry Facility Biosecurity  

E-Print Network [OSTI]

of organic materials on tires and shoes. Design features should include a one-way traff_ic system for all poultry facilities. The system should route personnel, vehicles and poultry from youngest birds to oldest birds, from ?clean? areas to ?dirty? areas... from waterways used by migra - tory waterfowl. Locate new facilities as far as possible from roads handling high volumes of poultry vehicles such as feed trucks or live-haul vehicles. Poultry facilities also need adequate amounts of potable water...

Carey, John B.; Prochaska, J. Fred; Jeffrey, Joan S.

2005-12-21T23:59:59.000Z

425

Generation -IV Reactor Concepts  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Generation-IV Reactor Concepts Generation-IV Reactor Concepts Thomas H. Fanning Argonne National Laboratory 9700 South Cass Avenue Argonne, Illinois 60439, USA The Generation-IV International Forum (GIF) is a multi-national research and development (R&D) collaboration. The GIF pursues the development of advanced, next generation reactor technology with goals to improve: a) sustainability (effective fuel utilization and minimization of waste) b) economics (competitiveness with respect to other energy sources) c) safety and reliability (e.g., no need for offsite emergency response), and d) proliferation resistance and physical protection The GIF Technology Roadmap exercise selected six generic systems for further study: the Gas- cooled Fast Reactor (GFR), the Lead-cooled Fast Reactor (LFR), the Molten Salt Reactor (MSR),

426

Elastic neutron-scattering experiments at the Geesthacht Neutron Facility (GeNF)  

Science Journals Connector (OSTI)

The Geesthacht Neutron Facility (GeNF) comprises experimental facilities for elastic neutron scattering for materials research and engineering problems as well as for environmental research purposes at the research reactor FRG-1. The experimental facilities for elastic neutron-scattering experiments at GeNF, most of which can be optimally used with polarized neutrons, will be presented. They are open to national and international users from universities and other research institutes at no cost.

R Kampmann; R Wagner

1997-01-01T23:59:59.000Z

427

ARM Climate Research Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages

banner banner Home | People | Site Index Atmospheric Radiation Measurement Climate Research Facility US Department of Energy About Science Campaigns Sites Instruments Measurements Data News Publications Education Become a User Recovery Act Mission FAQ Outreach Displays History Organization Participants Facility Statistics Forms Contacts Research Themes Research Highlights Journal Articles Collaborations Atmospheric System Research (ASR) ARM Science Team Meetings Propose a Campaign Submitting Proposals: Guidelines Featured Campaigns Campaign Data List of Campaigns Aerial Facility Eastern North Atlantic Mobile Facilities North Slope of Alaska Southern Great Plains Tropical Western Pacific Location Table Contacts Instrument Datastreams Value-Added Products PI Data Products Field Campaign Data Related Data

428

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

20, 2008 Facility News ARM Scientists Lead International Radiation Symposium in Brazil Bookmark and Share The ARM Science Team showed up in force at the 2008 International...

429

Sandia National Laboratories: Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Facilities Sandian Presents on PV Failure Analysis at European PV Solar Energy Conference and Exhibition (EU PVSC) On December 15, 2014, in Computational Modeling & Simulation,...

430

Sandia National Laboratories: Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Production Method Could Lead to Better Lights, Lenses, Solar Cells On July 1, 2014, in Capabilities, CINT, Energy, Energy Efficiency, Facilities, Materials Science,...

431

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

June 30, 2007 Facility News New Radar Wind Profiler Joins AMF Instrument Suite in Germany Bookmark and Share The 1290 MHz wind profiler (foreground) joins the eddy correlation...

432

ARM Mobile Facilities  

ScienceCinema (OSTI)

This video provides an overview of the ARM Mobile Facilities, two portable climate laboratories that can deploy anywhere in the world for campaigns of at least six months.

Orr, Brad; Coulter, Rich

2014-09-15T23:59:59.000Z

433

AMF ARM Mobile FAcility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AMF ARM Mobile FAcility Details on the AMF proposal process can be found at http:www.arm.govacrfsubmitproposals.stm. For more information, contact: Mark Miller Mary Jane...

434

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

2007 Facility News Field Campaigns Generate Interest from Aviation Aficionados in Oklahoma Bookmark and Share Dr. Pete Lamb On November 13, Dr. Pete Lamb attended a meeting of...

435

Lighting Test Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Custom Projects Lighting Test Facilities SSL Guidelines Industrial Federal Agriculture LED Street and Area Lighting Field Test of Exterior LED Down Lights Abstract Outdoor...

436

ARM Mobile Facilities  

SciTech Connect (OSTI)

This video provides an overview of the ARM Mobile Facilities, two portable climate laboratories that can deploy anywhere in the world for campaigns of at least six months.

Orr, Brad; Coulter, Rich

2010-12-13T23:59:59.000Z

437

Facility Survey & Transfer  

Broader source: Energy.gov [DOE]

As DOE facilities become excess, many that are radioactively and/or chemically contaminated will become candidate for transfer to DOE-EM for deactivation and decommissioning.

438

Neutron Scattering Facilities  

Science Journals Connector (OSTI)

The past history, present performance and future prospects for neutron scattering facilities will be discussed. Special features of neutron scattering techniques applicable to biological problems will be ... . Th...

D. L. Price

1996-01-01T23:59:59.000Z

439

Sandia National Laboratories: Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

July 31, 2014, in DETL, Distribution Grid Integration, Energy, Energy Surety, Facilities, Grid Integration, Infrastructure Security, News, News & Events, Photovoltaic, Renewable...

440

Science and Technology Facility  

Office of Environmental Management (EM)

IBRF Project Lessons Learned Report Integrated Biorefinery Research Facility Lessons Learned - Stage I Acquisition through Stage II Construction Completion August 2011 This...

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Supercomputing | Facilities | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

facilities, and authorization checks for physical access. An integrated cyber security plan encompasses all aspects of computing. Cyber security plans are risk-based....

442

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

the website still features the familiar faces of Professor Polar Bear, Teacher Turtle, and PI Prairie Dog (each representing an ARM Climate Research Facility site), but now...

443

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

(left) and 2-channel (right) NFOV radiometers are collocated with the infrared thermometer (green stripe) at the SGP Central Facility. Numerous other instruments are situated...

444

A Simplified Shuttle Irradiation Facility for ATR  

SciTech Connect (OSTI)

During the past fifteen years there has been a steady increase in the demand for radioisotopes in nuclear medicine and a corresponding decline in the number of reactors within the U.S. capable of producing them. The Advanced Test Reactor (ATR) is the largest operating test reactor in the U.S., but its isotope production capabilities have been limited by the lack of an installed isotope shuttle irradiation system. A concept for a simple “low cost” shuttle irradiation facility for ATR has been developed. Costs were reduced (in comparison to previous ATR designs) by using a shielded trough of water installed in an occupiable cubicle as a shielding and contamination control barrier for the send and receive station. This shielding concept also allows all control valves to be operated by hand and thus the need for an automatic control system was eliminated. It was determined that 4 – 5 ft of water would be adequate to shield the isotopes of interest while shuttles are transferred to a small carrier. An additional feature of the current design is a non-isolatable by-pass line, which provides a minimum coolant flow to the test region regardless of which control valves are opened or closed. This by-pass line allows the shuttle facility to be operated without bringing reactor coolant water into the cubicle except for send and receive operations. The irradiation position selected for this concept is a 1.5 inch “B” hole (B-11). This position provides neutron fluxes of approximately: 1.6 x 1014 (<0.5 eV) and 4.0 x 1013 (>0.8 MeV) n/cm2*sec.

Palmer, Alma Joseph; Laflin, S. T.

1999-09-01T23:59:59.000Z

445

Power Reactor Progress  

Science Journals Connector (OSTI)

Argonne kicks off EBWR; Allis-Chalmers plans power reactor using both nuclear and conventional fuels ... NUCLEAR POWER took two giant steps last week. ... Just as the first nuclear power system in the U. S. designed and built solely for the generation of electric power went into full operation at Argonne, Allis-Chalmers came up with a new twist in power reactors—a controlled recirculation boiling reactor (CRBR) using both nuclear and conventional fuels (C&EN, Feb. 18, page 7). ...

1957-02-25T23:59:59.000Z

446

Improved vortex reactor system  

DOE Patents [OSTI]

An improved vortex reactor system is described for affecting fast pyrolysis of biomass and Refuse Derived Fuel (RDF) feed materials comprising: a vortex reactor having its axis vertically disposed in relation to a jet of a horizontally disposed steam ejector that impels feed materials from a feeder and solids from a recycle loop along with a motive gas into a top part of said reactor. 12 figs.

Diebold, J.P.; Scahill, J.W.

1995-05-09T23:59:59.000Z

447

CRAD, Engineering- Oak Ridge National Laboratory High Flux Isotope Reactor  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Engineering Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

448

CRAD, Management- Oak Ridge National Laboratory High Flux Isotope Reactor  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Management in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

449

CRAD, Training- Oak Ridge National Laboratory High Flux Isotope Reactor  

Broader source: Energy.gov [DOE]

A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) used for a February 2007 assessment of the Training Program in preparation for restart of the Oak Ridge National Laboratory High Flux Isotope Reactor.

450

Japan prepares to pitch for international fusion reactor  

Science Journals Connector (OSTI)

... Japan has taken another tentative step towards hosting the International Thermonuclear Experimental Reactor (ITER), ... 's Atomic Energy Commission approved a report supporting construction of the multibillion dollar project in Japan. But the commission also emphasized that hosting the facility must not harm existing Japanese ...

David Cyranoski

2001-04-19T23:59:59.000Z

451

AEC Pushes Fusion Reactors  

Science Journals Connector (OSTI)

AEC Pushes Fusion Reactors ... Project Sherwood, as the study program is called, began in 1951-52 soon after the first successful thermonuclear explosion in the Pacific. ...

1955-10-10T23:59:59.000Z

452

Tokamak reactor first wall  

DOE Patents [OSTI]

This invention relates to an improved first wall construction for a tokamak fusion reactor vessel, or other vessels subjected to similar pressure and thermal stresses.

Creedon, R.L.; Levine, H.E.; Wong, C.; Battaglia, J.

1984-11-20T23:59:59.000Z

453

Advanced Nuclear Research Reactor  

SciTech Connect (OSTI)

This report describes technical modifications implemented by INVAP to improve the safety of the Research Reactors the company designs and builds.

Lolich, J.V.

2004-10-06T23:59:59.000Z

454

A review of decommissioning considerations for new reactors  

SciTech Connect (OSTI)

At a time of 'nuclear renaissance' when the focus is on advanced reactor designs and construction, it is easy to overlook the decommissioning considerations because such a stage in the life of the new reactors will be some sixty years down the road. Yet, one of the lessons learned from major decommissioning projects has been that decommissioning was not given much thought when these reactors were designed three or four decades ago. Hence, the time to examine what decommissioning considerations should be taken into account is right from the design stage with regular updates of the decommissioning strategy and plans throughout the life cycle of the reactor. Designing D and D into the new reactor designs is necessary to ensure that the tail end costs of the nuclear power are manageable. Such considerations during the design stage will facilitate a more cost-effective, safe and timely decommissioning of the facility when a reactor is eventually retired. This paper examines the current regulatory and industry design guidance for the new reactors with respect to the decommissioning issues and provides a review of the design considerations that can help optimize the reactor designs for the eventual decommissioning. (authors)

Devgun, J.S.Ph.D. [Manager Nuclear Power Technologies, Sargent and Lundy LLC, Chicago, IL (United States)

2008-07-01T23:59:59.000Z

455

Waste minimization at a plutonium processing facility  

SciTech Connect (OSTI)

As part of Los Alamos National Laboratory`s (LANL) mission to reduce the nuclear danger throughout the world, the plutonium processing facility at LANL maintains expertise and skills in nuclear weapons technologies as well as leadership in all peaceful applications of plutonium technologies, including fuel fabrication for terrestrial and space reactors and heat sources and thermoelectric generators for space missions. Another near-term challenge resulted from two safety assessments performed by the Defense Nuclear Facilities Safety Board and the U.S. Department of Energy during the past two years. These assessments have necessitated the processing and stabilization of plutonium contained in tons of residues so that they can be stored safely for an indefinite period. This report describes waste streams and approaches to waste reduction of plutonium management.

Pillay, K.K.S. [Los Alamos National Laboratory, NM (United States)

1995-12-31T23:59:59.000Z

456

Naval Petroleum Reserve No. 3 (NPR-3), Teapot Dome Field, Wyoming: Case history of the in situ combustion pilot operation  

SciTech Connect (OSTI)

Naval Petroleum Reserve No. 3 (NPR-3) is a federally owned oil field that has been in operation since 1922 and has produced more than 15 million barrels of oil since full production began in 1976. The Shannon sandstone is the shallowest and most productive of nine producing formations at NPR-3. Since only 5% of the Shannon`s estimated 144 million bbl of original oil in place (OOIP) was estimated to be recoverable by primary means, studies were undertaken in 1978 to determine the most suitable enhanced oil recovery (EOR) method which would merit a pilot test and could ultimately lead to a fieldwide application.

Sarathi, P.S.; Olsen, D.K.; Williams, C.R.

1995-02-01T23:59:59.000Z

457

Partnerships Help Advance Small Modular Reactor Technology | Department of  

Broader source: Energy.gov (indexed) [DOE]

Partnerships Help Advance Small Modular Reactor Technology Partnerships Help Advance Small Modular Reactor Technology Partnerships Help Advance Small Modular Reactor Technology March 5, 2012 - 12:00pm Addthis WASHINGTON, D.C. - DOE recently announced three public-private partnerships to develop deployment plans for small modular nuclear reactor (SMR) technologies at Savannah River Site (SRS) facilities near Aiken, S.C. Read the full story on the Memorandums of Agreement to help leverage SRS land assets, energy facilities and nuclear expertise to support potential private sector development, testing and licensing of prototype SMR technologies. Addthis Related Articles Energy Department Announces Small Modular Reactor Technology Partnerships at Savannah River Site The development of clean, affordable nuclear power options is a key element of the Energy Department's Nuclear Energy Research and Development Roadmap. As a part of this strategy, a high priority of the Department has been to help accelerate the timelines for the commercialization and deployment of small modular reactor (SMR) technologies through the SMR Licensing Technical Support program. | Photo by the Energy Department.

458

Reactor Safety Research Programs Quarterly Report October - December 1981  

SciTech Connect (OSTI)

This document summarizes the work performed by Pacific Northwest laboratory (PNL) from October 1 through December 31, 1981, for the Division of Accident Evaluation, U.S. Nuclear Regulatory Commission (NRC). Evaluations of nondestructive examination (NDE) techniques and instrumentation are reported; areas of investigation include demonstrating the feasibility of determining the strength of structural graphite, evaluating the feasibility of detecting and analyzing flaw growth in reactor pressure boundary systems, examining NDE reliability and probabilistic fracture mechanics, and assessing the integrity of pressurized water reactor (PWR) steam generator tubes where serviceinduced degradation has been indicated. Experimental data and analytical models are being provided to aid in decision-making regarding pipe-to-pipe impacts following postulated breaks in high-energy fluid system piping. Core thermal models are being developed to provide better digital codes to compute the behavior of full-scale reactor systems under postulated accident conditions. Fuel assemblies and analytical support are being provided for experimental programs at other facilities. These programs include loss-of-coolant accident (LOCA) simulation tests at the NRU reactor, Chalk River, Canada; fuel rod deformation, severe fuel damage, and post accident coolability tests for the ESSOR reactor Super Sara Test Program, lspra, Italy; the instrumented fuel assembly irradiation program at Halden, Norway; and experimental programs at the Power Burst Facility, Idaho National Engineering Laboratory (INEL), Idaho Falls, Idaho. These programs will provide data for computer modeling of reactor system and fuel performance during various abnormal operating conditions.

Edler, S. K.

1982-03-01T23:59:59.000Z

459

Hanford Site Near-Facility Environmental Monitoring Data Report for Calendar Year 2008  

SciTech Connect (OSTI)

Near-facility environmental monitoring is defined as monitoring near facilities that have the potential to discharge or have discharged, stored, or disposed of radioactive or hazardous materials. Monitoring locations are associated with nuclear facilities such as the Plutonium Finishing Plant, Canister Storage Building, and the K Basins; inactive nuclear facilities such as N Reactor and the Plutonium-Uranium Extraction (PUREX) Facility; and waste storage or disposal facilities such as burial grounds, cribs, ditches, ponds, tank farms, and trenches. Much of the monitoring consists of collecting and analyzing environmental samples and methodically surveying areas near facilities. The program is also designed to evaluate acquired analytical data, determine the effectiveness of facility effluent monitoring and controls, assess the adequacy of containment at waste disposal units, and detect and monitor unusual conditions.

Perkins, Craig J.; Dorsey, Michael C.; Mckinney, Stephen M.; Wilde, Justin W.; Poston, Ted M.

2009-09-15T23:59:59.000Z

460

Science &Technology Facilities Council  

E-Print Network [OSTI]

and Science & Technology Facilities Council invite you to The ESA Technology Transfer Network SpaceTech2012Science &Technology Facilities Council Innovations Issue 31 October 2012 This issue: 1 STFC International prize for `no needles' breast cancer diagnosis technique 6 CEOI Challenge Workshop ­ Current

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Nanotechnology User Facility for  

E-Print Network [OSTI]

A National Nanotechnology User Facility for Industry Academia Government #12;The National Institute of Commerce's nanotechnology user facility. The CNST enables innovation by providing rapid access to the tools new measurement and fabrication methods in response to national nanotechnology needs. www

462

Facilities Management CAD Standards  

E-Print Network [OSTI]

Facilities Management CAD Standards 2011 #12;Facilities Management CAD Standards Providing: Layering Standards 2.1 Layer Name Format 2.2 Layer Name Modifiers 2.3 Layer Attributes 2.4 Special Layer of PDF and DWG Files APPENDIX A: DAL FM CAD Standard Layers APPENDIX B: DAL FM CAD Special Layers

Brownstone, Rob

463

Cornell University Facilities Services  

E-Print Network [OSTI]

requirements, building code, and sustainability objectives. This plan takes a long- term view, projecting workCornell University Facilities Services Contract Colleges Facilities Fernow and Rice Hall in Fernow, Rice, Bruckner, Bradfield and Plant Science buildings. It includes a surging and phasing plan

Manning, Sturt

464

Emergency Facilities and Equipment  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This volume clarifies requirements of DOE O 151.1 to ensure that emergency facilities and equipment are considered as part of emergency management program and that activities conducted at these emergency facilities are fully integrated. Canceled by DOE G 151.1-4.

1997-08-21T23:59:59.000Z

465

Safety of Decommissioning of Nuclear Facilities  

SciTech Connect (OSTI)

Full text of publication follows: ensuring safety during all stages of facility life cycle is a widely recognised responsibility of the operators, implemented under the supervision of the regulatory body and other competent authorities. As the majority of the facilities worldwide are still in operation or shutdown, there is no substantial experience in decommissioning and evaluation of safety during decommissioning in majority of Member States. The need for cooperation and exchange of experience and good practices on ensuring and evaluating safety of decommissioning was one of the outcomes of the Berlin conference in 2002. On this basis during the last three years IAEA initiated a number of international projects that can assist countries, in particular small countries with limited resources. The main IAEA international projects addressing safety during decommissioning are: (i) DeSa Project on Evaluation and Demonstration of Safety during Decommissioning; (ii) R{sup 2}D{sup 2}P project on Research Reactors Decommissioning Demonstration Project; and (iii) Project on Evaluation and Decommissioning of Former Facilities that used Radioactive Material in Iraq. This paper focuses on the DeSa Project activities on (i) development of a harmonised methodology for safety assessment for decommissioning; (ii) development of a procedure for review of safety assessments; (iii) development of recommendations on application of the graded approach to the performance and review of safety assessments; and (iv) application of the methodology and procedure to the selected real facilities with different complexities and hazard potentials (a nuclear power plant, a research reactor and a nuclear laboratory). The paper also outlines the DeSa Project outcomes and planned follow-up activities. It also summarises the main objectives and activities of the Iraq Project and introduces the R{sup 2}D{sup 2} Project, which is a subject of a complementary paper.

Batandjieva, B.; Warnecke, E.; Coates, R. [International Atomic Energy Agency, Vienna (Austria)

2008-01-15T23:59:59.000Z

466

Privacy Impact Assessment OFEO Facilities Management System Facilities Center  

E-Print Network [OSTI]

Privacy Impact Assessment OFEO Facilities Management System ­ Facilities Center I. System Identification 1. IT System Name: Facilities Management System - FacilityCenter 2. IT System Sponsor: Office. IT System Manager: Michelle T. Gooch, Facilities Management Systems Manager 5. PIA Author: Michelle T. Gooch

Mathis, Wayne N.

467

A TEN MEGAWATT BOILING HETEROGENEOUS PACKAGE POWER REACTOR. Reactor...  

Office of Scientific and Technical Information (OSTI)

A TEN MEGAWATT BOILING HETEROGENEOUS PACKAGE POWER REACTOR. Reactor Design and Feasibility Problem Re-direct Destination: Temp Data Fields Rosen, M. A.; Coburn, D. B.; Flynn, T....

468

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

30, 2007 [Facility News] 30, 2007 [Facility News] High-Speed Internet Deflects Information Overload Bookmark and Share Covering approximately 143,000 square kilometers in Oklahoma and Kansas, instruments at the various facilities throughout the SGP site generate approximately 27 gigabytes of data every day. Covering approximately 143,000 square kilometers in Oklahoma and Kansas, instruments at the various facilities throughout the SGP site generate approximately 27 gigabytes of data every day. A little more room in the internet link at the ARM Southern Great Plains site is providing needed relief to the crowded lines that keep data flowing from the site. In July 2007, the internet service from the SGP Central Facility was switched to a higher speed (6 megabits) link, increasing the

469

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

, 2009 [Facility News] , 2009 [Facility News] Mobile Facility Begins Marine Cloud Study in the Azores Bookmark and Share Located next to the airport on Graciosa Island, the ARM Mobile Facility's comprehensive and sophisticated instrument suite will obtain atmospheric measurements from the marine boundary layer. Located next to the airport on Graciosa Island, the ARM Mobile Facility's comprehensive and sophisticated instrument suite will obtain atmospheric measurements from the marine boundary layer. Extended deployment will obtain seasonal statistics to improve climate models Today marks the beginning of a 20-month field campaign on Graciosa Island in the Azores to study the seasonal life cycle of marine clouds and how they modulate the global climate system. Sponsored by the U.S. Department

470

BNL | Research Facilities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Brookhaven's Research Facilities Brookhaven's Research Facilities Tools of Discovery Brookhaven National Lab excels at the design, construction, and operation of large-scale, cutting-edge research facilities-some available nowhere else in the world. Each year, thousands of scientists from laboratories, universities, and industries around the world use these facilities to delve into the basic mysteries of physics, chemistry, biology, materials science, energy, and the environment-and develop innovative applications that arise, sometimes at the intersections of these disciplines. construction Brookhaven Lab is noted for the design, construction and operation of large-scale, cutting-edge research facilities that support thousands of scientists worldwide. RHIC tunnel Relativistic Heavy Ion Collider

471

ARM Aerial Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

govSitesAerial Facility govSitesAerial Facility AAF Information Proposal Process Science (PDF) Baseline Instruments Campaign Instruments Instrumentation Workshop 2008 AAF Fact Sheet G-1 Fact Sheet Images Field Campaigns AAF Campaigns 2007 - UAV Campaigns 1993 - 2006, 2015 Other Aircraft Campaigns 1993 - 2010 AAF Contacts Rickey Petty DOE AAF Program Director Beat Schmid Technical Director ARM Aerial Facility Numerous instrumented aircraft participated in CLASIC, a cross-disciplinary interagency research effort. Numerous instrumented aircraft participated in CLASIC, a cross-disciplinary interagency research effort. As an integral measurement capability of the ARM Climate Research Facility, the ARM Aerial Facility (AAF) provides airborne measurements required to answer science questions proposed by the ARM Science Team and the external

472

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

15, 2010 [Facility News] 15, 2010 [Facility News] Water Vapor Network at SGP Site Goes Offline Bookmark and Share Each of the 24 solar-powered GPS stations streamed data via a wireless network to the SGP Central Facility for data collection and storage. Each of the 24 solar-powered GPS stations streamed data via a wireless network to the SGP Central Facility for data collection and storage. After nearly eleven years, the Single Frequency GPS Water Vapor Network field campaign at the ARM Southern Great Plains (SGP) site came to a close on July 1, 2010. Installed between 1999 and 2000, this network consisted of 24 GPS stations operating within an 8-kilometer radius around the SGP Central Facility near Lamont, Oklahoma. Developed to function as a single instrument, the network simultaneously measured "slant water vapor" in

473

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

30, 2005 [Facility News] 30, 2005 [Facility News] Coastal Clouds Field Campaign Takes Off in July Bookmark and Share The 2-channel NFOV gets careful attention as it joins the suite of instruments collecting data for the ARM Mobile Facility field campaign at Point Reyes National Seashore. The 2-channel NFOV gets careful attention as it joins the suite of instruments collecting data for the ARM Mobile Facility field campaign at Point Reyes National Seashore. Since March 2005, the ARM Mobile Facility (AMF) has been at Point Reyes National Seashore in northern California for the Marine Stratus Radiation, Aerosol, and Drizzle Intensive Operational Period. The goals of this 6-month field campaign are to collect data from cloud/aerosol interactions and to improve understanding of cloud organization that is often associated

474

NSA Barrow Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Barrow Facility Barrow Facility NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts NSA Barrow Facility Location: 71° 19' 23.73" N, 156° 36' 56.70" W Altitude: 8 meters The Barrow facility was dedicated in July 1997 and chosen because the Arctic is particularly sensitive to climate changes. Barrow is located at the northernmost point in the United States, 330 miles north of the Arctic Circle. Also known as the Top of the World, Barrow is Alaska's largest Eskimo village (home to 4,581 people). Tax revenue from the Slope's oil fields pay for services borough wide, and natural gas is used to heat homes and generate electricity in Barrow. Many residents, however, maintain

475

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

25, 2013 [Education, Facility News] 25, 2013 [Education, Facility News] Junior Rangers Enjoy Science Education at ARM Facility on Cape Cod Bookmark and Share Children and adults join in the balloon launch countdown at the ARM Mobile Facility site at Cape Cod National Seashore. Weather balloons are launched at regular intervals four times per day throughout the one-year campaign. Children and adults join in the balloon launch countdown at the ARM Mobile Facility site at Cape Cod National Seashore. Weather balloons are launched at regular intervals four times per day throughout the one-year campaign. School break means vacation, and around Cape Cod, that often means a trip to the seashore. On April 17, families looking for fun and educational outdoor activities spent several hours at Cape Cod National Seashore's

476

ARM - NSA Barrow Facility  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Barrow Facility Barrow Facility NSA Related Links Facilities and Instruments Barrow Atqasuk ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site Images Information for Guest Scientists Contacts NSA Barrow Facility Location: 71° 19' 23.73" N, 156° 36' 56.70" W Altitude: 8 meters The Barrow facility was dedicated in July 1997 and chosen because the Arctic is particularly sensitive to climate changes. Barrow is located at the northernmost point in the United States, 330 miles north of the Arctic Circle. Also known as the Top of the World, Barrow is Alaska's largest Eskimo village (home to 4,581 people). Tax revenue from the Slope's oil fields pay for services borough wide, and natural gas is used to heat homes and generate electricity in Barrow. Many residents, however, maintain

477

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

May 15, 2004 [Facility News] May 15, 2004 [Facility News] Mid-latitude Cirrus Cloud Experiment Underway Bookmark and Share NASA's WB-57F research aircraft can carry an instrument payload up to 6,000 lbs. NASA's WB-57F research aircraft can carry an instrument payload up to 6,000 lbs. In late April, scientific collaborators at the National Aeronautics and Space Administration (NASA) carried out two high-altitude flights over the ARM Climate Research Facility Southern Great Plains (SGP) central facility. The purpose of these flights was to use a new suite of cloud property probes on the WB-57F aircraft to more accurately characterize the properties of mid-latitude cirrus clouds-which are composed solely of ice crystals-than has previously been possible. Eight flights over the SGP central facility were originally planned, but the expected cirrus clouds

478

FACILITY SAFETY (FS)  

Broader source: Energy.gov (indexed) [DOE]

FACILITY SAFETY (FS) FACILITY SAFETY (FS) OBJECTIVE FS.1 - (Core Requirement 7) Facility safety documentation in support of SN process operations,is in place and has been implemented that describes the safety envelope of the facility. The, safety documentation should characterize the hazards/risks associated with the facility and should, identify preventive and mitigating measures (e.g., systems, procedures, and administrative, controls) that protect workers and the public from those hazards/risks. (Old Core Requirement 4) Criteria 1. A DSA has been prepared by FWENC, approved by DOE, and implemented to reflect the SN process operations in the WPF. (10 CFR 830.200, DOE-STD-3009-94) 2. A configuration control program is in place and functioning such that the DSA is

479

ARM - Facility News Article  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

7, 2009 [Facility News] 7, 2009 [Facility News] Town Hall Meeting at AGU 2009 Fall Meeting Bookmark and Share ARM Climate Research Facility - New Measurement Capabilities for Climate Research Thursday, December 17, 6:15-7:15 pm, Moscone West Room 2002 American Recovery and Reinvestment Act American Recovery and Reinvestment Act Scientists from around the world use data from the ARM Climate Research Facility to study the interactions between clouds, aerosol and radiation. Through the American Recovery and Reinvestment Act of 2009, the DOE Office of Science received $1.2 billion, with $60 million allocated to the ARM Climate Research Facility. With these funds, ARM will purchase and deploy dual-frequency scanning cloud radars to all the ARM sites, enhance several sites with precipitation radars and energy flux measurement capabilities,

480

Irradiation research capabilities at HFIR (High Flux Isotope Reactor) and ANS (Advanced Neutron Source)  

SciTech Connect (OSTI)

A variety of materials irradiation facilities exist in the High Flux Isotope Reactor (HFIR) and are planned for the Advanced Neutron Source (ANS) reactor. In 1986 the HFIR Irradiation Facilities Improvement (HIFI) project began modifications to the HFIR which now permit the operation of two instrumented capsules in the target region and eight capsules of 46-mm OD in the RB region. Thus, it is now possible to perform instrumented irradiation experiments in the highest continuous flux of thermal neutrons available in the western world. The new RB facilities are now large enough to permit neutron spectral tailoring of experiments and the modified method of access to these facilities permit rotation of experiments thereby reducing fluence gradients in specimens. A summary of characteristics of irradiation facilities in HFIR is presented. The ANS is being designed to provide the highest thermal neutron flux for beam facilities in the world. Additional design goals include providing materials irradiation and transplutonium isotope production facilities as good, or better than, HFIR. The reference conceptual core design consists of two annular fuel elements positioned one above the other instead of concentrically as in the HFIR. A variety of materials irradiation facilities with unprecedented fluxes are being incorporated into the design of the ANS. These will include fast neutron irradiation facilities in the central hole of the upper fuel element, epithermal facilities surrounding the lower fuel element, and thermal facilities in the reflector tank. A summary of characteristics of irradiation facilities presently planned for the ANS is presented. 2 tabs.

Thoms, K.R.

1990-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "naval reactors facility" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Portfolio for fast reactor collaboration  

SciTech Connect (OSTI)

The development of the LMFBR type reactor in the United Kingdom is reviewed. Design characteristics of a commercial demonstration fast reactor are presented and compared with the Super Phenix reactor.

Rippon, S.

1981-12-01T23:59:59.000Z

482

Interim Storage of Plutonium in Existing Facilities  

SciTech Connect (OSTI)

'In this era of nuclear weapons disarmament and nonproliferation treaties, among many problems being faced by the Department of Energy is the safe disposal of plutonium. There is a large stockpile of plutonium at the Rocky Flats Environmental Technology Center and it remains politically and environmentally strategic to relocate the inventory closer to a processing facility. Savannah River Site has been chosen as the final storage location, and the Actinide Packaging and Storage Facility (APSF) is currently under construction for this purpose. With the ability of APSF to receive Rocky Flats material an estimated ten years away, DOE has decided to use the existing reactor building in K-Area of SRS as temporary storage to accelerate the removal of plutonium from Rocky Flats. There are enormous cost savings to the government that serve as incentive to start this removal as soon as possible, and the KAMS project is scheduled to receive the first shipment of plutonium in January 2000. The reactor building in K-Area was chosen for its hardened structure and upgraded seismic qualification, both resulting from an effort to restart the reactor in 1991. The KAMS project has faced unique challenges from Authorization Basis and Safety Analysis perspectives. Although modifying a reactor building from a production facility to a storage shelter is not technically difficult, the nature of plutonium has caused design and safety analysis engineers to make certain that the design of systems, structures and components included will protect the public, SRS workers, and the environment. A basic overview of the KAMS project follows. Plutonium will be measured and loaded into DOT Type-B shipping packages at Rocky Flats. The packages are 35-gallon stainless steel drums with multiple internal containment boundaries. DOE transportation vehicles will be used to ship the drums to the KAMS facility at SRS. They will then be unloaded, stacked and stored in specific locations throughout the reactor building. The storage life is projected to be ten years to allow the preparation of APSF. DOE has stipulated that there be no credible release during storage, since there are no design features in place to mitigate a release of plutonium (i.e. HEPA filters, facility containment boundaries, etc.). This mandate has presented most of the significant challenges to the safety analysis team. The shipping packages are designed to withstand certain accidents and conditions, but in order to take credit for these the storage environment must be strictly controlled. Damages to the packages from exposure to fire, dropping, crushing and other impact accidents have been analyzed, and appropriate preventative design features have been incorporated. Other efforts include the extension of the shipping life (roughly two years) to a suitable storage life of ten years. These issues include the effects of internal pressure increases, seal degradation and the presence of impurities. A process known as the Container Qualification Program has been conducted to address these issues. The KAMS project will be ready to receive the first shipment from Rocky Flats in January 2000. No credible design basis scenarios resulting in the release of plutonium exist. This work has been useful in the effort to provide a safer disposition of plutonium, but also the lessons learned and techniques established by the team will help with the analysis of future facility modifications.'

Woodsmall, T.D.

1999-05-10T23:59:59.000Z

483

Naval Research Laboratory`s programs in advanced indium phosphide solar cell development  

SciTech Connect (OSTI)

The Naval Research Laboratory has been involved in developing InP solar cell technology since 1988. The purpose of these programs was to produce advanced cells for use in very high radiation environments, either as a result of operating satellites in the Van Allen belts or for very long duration missions in other orbits. Richard Statler was technical representative on the first program, with Spire Corporation as the contractor, which eventually produced several hundred, high efficiency 2 x 2 sq cm single crystal InP cells. The shallow homojunction technology which was developed in this program enabled cells to be made with AMO, one sun efficiencies greater than 19%. Many of these cells have been flown on space experiments, including PASP Plus, which have confirmed the high radiation resistance of InP cells. NRL has also published widely on the radiation response of these cells and also on radiation-induced defect levels detected by DLTS, especially the work of Rob Walters and Scott Messenger. In 1990 NRL began another Navy-sponsored program with Tim Coutts and Mark Wanlass at the National Renewable Energy Laboratory (NREL), to develop a one sun, two terminal space version of the InP-InGaAs tandem junction cell being investigated at NREL for terrestrial applications. These cells were grown on InP substrates. Several cells with AMO, one sun efficiencies greater than 22% were produced. Two 2 x 2 sq cm cells were incorporated on the STRV lA/B solar cell experiment. These were the only two junction, tandem cells on the STRV experiment. The high cost and relative brittleness of InP wafers meant that if InP cell technology were to become a viable space power source, the superior radiation resistance of InP would have to be combined with a cheaper and more robust substrate. The main technical challenge was to overcome the effect of the dislocations produced by the lattice mismatch at the interface of the two materials.

Summers, G.P.

1995-10-01T23:59:59.000Z

484

Handbook of Reactor Physics  

Science Journals Connector (OSTI)

... THIS handbook is one volume in a series sponsored by the United States Atomic Energy Commission with ... data and reference information in the field of reactors. The volume is devoted to reactor physics and radiation shielding, the latter subject occupying approximately a quarter of the book.

PETER W. MUMMERY

1956-08-25T23:59:59.000Z

485

Fast reactor safety  

Science Journals Connector (OSTI)

... SIR, - In his article on fast reactor safety (26 July, page 270) Norman Dombey claims to introduce to non-specialists ... , page 270) Norman Dombey claims to introduce to non-specialists some features of fast reactors that are not available outside the technical literature. The non-specialist would do well ...

R.D. SMITH

1979-08-23T23:59:59.000Z

486

Instrumentation of Nuclear Reactors  

Science Journals Connector (OSTI)

... s Lecture Theatre on January 8, a symposium of papers on the instrumentation of nuclear reactors was organized, at which about five hundred members and visitors attended, including guests from ... the Institution, took the chair and introduced Sir John Cockcroft, whose lecture on "Nuclear Reactors and their Applications" provided a general background for the three specialized papers which followed. ...

1953-03-07T23:59:59.000Z

487

Nuclear Research Reactors  

Science Journals Connector (OSTI)

... their countries for the advent of nuclear power. A few countries had built large research reactors for the production of isotopes and to study the behaviour of nuclear fuel, but ... production of isotopes and to study the behaviour of nuclear fuel, but the small training reactor had not been developed. Since then, research ...

T. E. ALLIBONE

1963-07-20T23:59:59.000Z

488

Calibration Facilities | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities Calibration Facilities DOE supports the development, standardization, and maintenance of calibration facilities for environmental radiation sensors. Radiation standards at the facilities are primarily used to calibrate portable surface gamma-ray survey meters and borehole logging instruments used for uranium and other mineral exploration and remedial action measurements. Standards for calibrating borehole fission neutron devices are also available, but are used infrequently. Radiation standards are constructed of concrete with elevated, uniform concentrations of naturally occurring potassium, uranium, and/or thorium. Pad standards have large, flat surfaces suitable for calibration

489

Canadian university research reactors  

SciTech Connect (OSTI)

In Canada there are seven university research reactors: one medium-power (2-MW) swimming pool reactor at McMaster University and six low-power (20-kW) SLOWPOKE reactors at Dalhousie University, Ecole Polytechnique, the Royal Military College, the University of Toronto, the University of Saskatchewan, and the University of Alberta. This paper describes primarily the McMaster Nuclear Reactor (MNR), which operates on a wider scale than the SLOWPOKE reactors. The MNR has over a hundred user groups and is a very broad-based tool. The main applications are in the following areas: (1) neutron activation analysis (NAA); (2) isotope production; (3) neutron beam research; (4) nuclear engineering; (5) neutron radiography; and (6) nuclear physics.

Ernst, P.C.; Collins, M.F.

1989-11-01T23:59:59.000Z

490

Reactor & Nuclear Systems Publications | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Nuclear Science Home | Science & Discovery | Nuclear Science | Publications and Reports | Reactor and Nuclear Systems Publications SHARE Reactor and Nuclear Systems Publications...

491

RCRA facility assessments  

SciTech Connect (OSTI)

The Hazardous and Solid Waste Amendments of 1984 (HSWA) broadened the authorities of the Resource Conservation and Recovery Act (RCRA) by requiring corrective action for releases of hazardous wastes and hazardous constituents at treatment, storage, and disposal (TSD) facilities. The goal of the corrective action process is to ensure the remediation of hazardous waste and hazardous constituent releases associated with TSD facilities. Under Section 3004(u) of RCRA, operating permits issued to TSD facilities must address corrective actions for all releases of hazardous waste and hazardous constituents from any solid waste management unit (SWMU) regardless of when the waste was placed in such unit. Under RCRA Section 3008(h), the Environmental Protection Agency (EPA) may issue administrative orders to compel corrective action at facilities authorized to operate under RCRA Section 3005(e) (i.e., interim status facilities). The process of implementing the Corrective Action program involves the following, in order of implementation; (1) RCRA Facility Assessment (RFA); (2) RCRA Facility Investigation (RFI); (3) the Corrective Measures Study (CMS); and (4) Corrective Measures Implementation (CMI). The RFA serves to identify and evaluate SWMUs with respect to releases of hazardous wastes and hazardous constituents, and to eliminate from further consideration SWMUs that do not pose a threat to human health or the environment. This Information Brief will discuss issues concerning the RFA process.

NONE

1994-07-01T23:59:59.000Z

492

Improved catalyst loading reduces guard reactor fouling  

SciTech Connect (OSTI)

A new catalyst-loading strategy reduced the fouling tendency of the gas oil hydrotreater guard reactors at Syncrude Canada Ltd.'s heavy-crude upgrading facilities. Studies conducted on the guard reactors were designed to determine the thermal stability of the coker gas oil and to understand the properties of the fouling material. Small particles (described as fines) were present in the upper section of the removed catalyst bed. This part of the bed was then replaced in one of three ways. One way was to replace the catalyst with used, nonregenerated catalyst, and cover the catalyst with nonactive support balls, 10 and 13 mm in diameter. The second way was to fill the entire space with nonactive support balls, and the third way was to fill with regenerated oxidic catalyst combined with semiactive support balls (unsulf