Powered by Deep Web Technologies
Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


1

Isotopic Analysis At Lassen Volcanic National Park Area (Janik...  

Open Energy Info (EERE)

navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Isotopic Analysis At Lassen Volcanic National Park Area (Janik & Mclaren, 2010) Exploration Activity...

2

Mercury Vapor At Lassen Volcanic National Park Area (Varekamp...  

Open Energy Info (EERE)

Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Mercury Vapor At Lassen Volcanic National Park Area (Varekamp & Buseck, 1983) Exploration...

3

Surface Gas Sampling At Lassen Volcanic National Park Area (Janik...  

Open Energy Info (EERE)

Date Usefulness not indicated DOE-funding Unknown References Cathy J. Janik, Marcia K. McLaren (2010) Seismicity And Fluid Geochemistry At Lassen Volcanic National Park,...

4

Grazing Management in National Parks and Protected Areas: Science, Socio-economics and Legislation (Tenure)  

E-Print Network [OSTI]

functions as: 1. Depletion. Taking out (utilizing, exploiting) environmental resources (e.g. plants, nutrients, animals, etc.) in excess of regeneration rates; 2. Pollution. Putting in quantities of damaging elements in excess of rate of decomposition... Management in National Parks and Protected Areas 77 Activity Core Zone Multiple-Use Zone (Within Park Boundary) Buffer Zone (Outside Park Boundary) Construction (Including Roads, Fences, Any Physical Structures) No With Permit Yes Industry...

Wangchuk, Sangay

2002-01-01T23:59:59.000Z

5

How Much is Too Much ? Carrying capacity of National Parks and Protected Areas  

E-Print Network [OSTI]

Abstract: Increasing recreational use of national parks and protected areas can impact natural and cultural resources and the quality of the visitor experience. Determining how much recreational use can ultimately be accommodated in a park or protected area is often addressed through the concept of carrying capacity. Contemporary approaches to carrying capacity – including the Visitor Experience and Resource Protection (VERP) framework developed by the U.S. National Park Service – rely on formulation of indicators and standards of quality of natural/cultural resources and the visitor experience. This paper describes the VERP framework and its application in the U.S. national park system, including a program of research designed to help formulate indicators and standards of quality.

Robert E. Manning

2002-01-01T23:59:59.000Z

6

National Park Service- Yellowstone National Park, Wyoming  

Broader source: Energy.gov [DOE]

Yellowstone National Park, Wyoming, has many historical sites within its boundaries. One of these is the Lamar Buffalo Ranch, a ranch that was set up in the early 1900s to breed buffalo for replacement stock within the park during a time when their numbers were very low. The ranch buildings are currently being used by the Yellowstone Association Institute for ecology classes.

7

Mountain lion use of an area of high recreational development in Big Bend National Park, Texas  

E-Print Network [OSTI]

/Site Restrictions and Closures Habitat/Site Alterations. . . . . . . . . . . . Protocol for Incidents of Attack or Depredation. 113 113 120 128 135 141 147 150 Recommendations f or Management. . . . . . . . . Education of Visitors and Residents... subadults should be considered high risk. Alternative management actions for reducing risk to visitors were identified and evaluated. ACKNOWLEDGMENTS This study was cooperatively funded by Big Bend National Park (BIBE), Texas; The National Park Service...

Ruth, Toni Karen

1991-01-01T23:59:59.000Z

8

National Park Service- Chickasaw, Oklahoma  

Broader source: Energy.gov [DOE]

The Chickasaw National Recreation Area is located 100 miles south of Oklahoma City, Oklahoma, on the Lake of the Arbuckles. To save taxpayers' money and minimize adverse impacts on the environment, the National Park Service (NPS) recently incorporated solar energy into the design of three new comfort stations.

9

Bedrock acquifer geometry in the Panther Junction area of Big Bend National Park, Texas  

E-Print Network [OSTI]

for Permeability Testing and Data APPENDIX C 76 Gravity Survey Data 87 APPENDIX D Well Logs VITA 103 113 LIST OP TABLES Table 1. Phases of Well Development Page 2. Dry Density and Porosity of Rock Samples Determined by Laboratory Tests , 19 3... throughout the entire park. Hydrogeological data, drillers logs and geophysical logs, were included in the report. Figure 2 illustrates the location of the wells that are within the study area. The water-bearing bedrock formations in the area...

Abbott, Caroline Lownes

1983-01-01T23:59:59.000Z

10

AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Golden Gate National Recreation Area  

SciTech Connect (OSTI)

Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy's Idaho National Laboratory, is the lead laboratory for U.S. Department of Energy Advanced Vehicle Testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (ITSNA) to collect data on federal fleet operations as part of the Advanced Vehicle Testing Activity's Federal Fleet Vehicle Data Logging and Characterization study. The Advanced Vehicle Testing Activity study seeks to collect data to validate the utilization of advanced electric drive vehicle transportation. This report focuses on the Golden Gate National Recreation Area (GGNRA) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies' fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (PHEV) (collectively PEVs) can fulfill the mission requirements. GGNRA identified 182 vehicles in its fleet, which are under the management of the U.S. General Services Administration. Fleet vehicle mission categories are defined in Section 4, and while the GGNRA vehicles conduct many different missions, only two (i.e., support and law enforcement missions) were selected by agency management to be part of this fleet evaluation. The selected vehicles included sedans, trucks, and sport-utility vehicles. This report will show that battery electric vehicles and/or PHEVs are capable of performing the required missions and providing an alternative vehicle for support vehicles and PHEVs provide the same for law enforcement, because each has a sufficient range for individual trips and time is available each day for charging to accommodate multiple trips per day. These charging events could occur at the vehicle home base, high-use work areas, or intermediately along routes that the vehicles frequently travel. Replacement of vehicles in the current fleet would result in significant reductions in the emission of greenhouse gases and petroleum use, while also reducing fuel costs. The San Francisco Bay Area is a leader in the adoption of PEVs in the United States. PEV charging stations, or more appropriately identified as electric vehicle supply equipment, located on the GGNRA facility would be a benefit for both GGNRA fleets and general public use. Fleet drivers and park visitors operating privately owned PEVs benefit by using the charging infrastructure. ITSNA recommends location analysis of the GGNRA site to identify the optimal placement of the electric vehicle supply equipment station. ITSNA recognizes the support of Idaho National Laboratory and ICF International for their efforts to initiate communication with the National Parks Service and GGNRA for participation in the study. ITSNA is pleased to provide this report and is encouraged by the high interest and support from the National Park Service and GGNRA personnel.

Stephen Schey; Jim Francfort

2014-03-01T23:59:59.000Z

11

Mojave National Preserve Joshua Tree National Park  

E-Print Network [OSTI]

Forest (SBNF) Angeles National Forest (ANF) Cleveland National Forest (CNF) CNF CNF SBNF ANF CACA 049111°0'0"N 34°0'0"N 34°0'0"N 33°0'0"N 33°0'0"N California Desert Conservation Area BLM Solar Energy Project Contingent Corridor Deleted Corridor Land Status BLM National Park Service Forest Service Military USFWS

Laughlin, Robert B.

12

Transforming Parks and Protected Areas  

E-Print Network [OSTI]

Transforming Parks and Protected Areas Policy and governance in a changing world Edited by Kevin S from the British Library Library of Congress Cataloging In Publication Data Transforming parks

Bolch, Tobias

13

Review: Manufacturing National Park Nature  

E-Print Network [OSTI]

the Wilderness Industry of Jasper By J. Keri Cronin Reviewedthe Wilderness Industry of Jasper. Vancouver, BC: UBC Press,how photographic images of Jasper National Park in Alberta,

Mason, Fred

2012-01-01T23:59:59.000Z

14

Vehicle Technologies Office: AVTA - Evaluating National Parks...  

Energy Savers [EERE]

National Parks and Forest Service Fleets for Plug-in Electric Vehicles Vehicle Technologies Office: AVTA - Evaluating National Parks and Forest Service Fleets for Plug-in Electric...

15

Data Acquisition-Manipulation At Lassen Volcanic National Park...  

Open Energy Info (EERE)

82) Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Lassen Volcanic National Park Geothermal Area (1982)...

16

Teleseismic-Seismic Monitoring At Lassen Volcanic National Park...  

Open Energy Info (EERE)

navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Teleseismic-Seismic Monitoring At Lassen Volcanic National Park Area (Janik & Mclaren, 2010) Exploration...

17

Ground-water hydrology of the Panther Junction area of Big Bend National Park, Texas  

E-Print Network [OSTI]

of accumulated departure to zero following a drought indicates that the annual precipitation during the wet period has mostly been greater than the annual mean. Unfortunately, the length of the precipitation record makes it difficult to assess the frequency... and duration of droughts and wet periods in the area. Daily Precipitation Daily precipitation data recorded at each gauge in the temporary rain gauge network was plotted as a series of bar graphs; the bar graphs are shown in Figures 7 through 10...

Gibson, John Lawrence

1983-01-01T23:59:59.000Z

18

Mercury Vapor At Lassen Volcanic National Park Area (Varekamp & Buseck,  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429Lacey,(MonasterLowellisMcDonaldInformation Lahaina-Kaanapali Area

19

Flow Test At Lassen Volcanic National Park Area (Janik & Mclaren, 2010) |  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision has beenFfe2fb55-352f-473b-a2dd-50ae8b27f0a6Theoretical vsFlint Geothermal Area (DOE GTP) JumpEnergyOpen

20

Seeking Mountains Field Trip Jasper National Park  

E-Print Network [OSTI]

Seeking Mountains Field Trip Jasper National Park December 14-15, 2012 Jasper National Park of Jasper is one of only four communities located in a Canadian national park. We have arranged a special. The field trip includes as follows: a welcome reception at the Jasper Yellowhead Museum and Archives

MacMillan, Andrew

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


21

Research into wildlife/vehicle collisions in Jasper National Park  

E-Print Network [OSTI]

that have been used in Jasper National Park is also providedVEHICLE COLLISIONS IN JASPER NATIONAL PARK Jim Bertwistle (M.Sc. , National Park Warden, Jasper National Park, Box 10

Bertwistle, Jim

2003-01-01T23:59:59.000Z

22

The epidemiology and etiology of visitor injuries in Hawaii Volcanoes National Park  

E-Print Network [OSTI]

The U.S. National Park Service has recognized visitor health and safety as an important component of protected area management. Despite this recognition, research investigating visitor health and safety issues in national parks is lacking. In order...

Heggie, Travis Wade

2006-04-12T23:59:59.000Z

23

National Park Service- Lake Powell, Utah  

Broader source: Energy.gov [DOE]

Lake Powell is part of Utah's Glen Canyon National Recreation Area. The Dangling Rope Marina operates by using diesel generators to supply power. They use 65,000 gallons of diesel fuel per year that has to be barged in over Lake Powell. The potential for environmental damage to the marina in the event of a fuel spill is significant, and the cost to the National Park Service (NPS) for transporting each fuel delivery is considerable. Consequently, the installation of a photovoltaic (PV) system presented many advantages.

24

Hot Springs National Park Space Heating Low Temperature Geothermal...  

Open Energy Info (EERE)

National Park Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Hot Springs National Park Space Heating Low Temperature Geothermal Facility...

25

Before the Subcommittee on National Parks - Senate Committee...  

Office of Environmental Management (EM)

Subcommittee on National Parks - Senate Committee on Energy and Natural Resources Before the Subcommittee on National Parks - Senate Committee on Energy and Natural Resources...

26

National Park Service- San Miguel Island, California  

Broader source: Energy.gov [DOE]

San Miguel Island is one of five islands that make up Channel Islands National Park on the coast of southern California. The islands comprise 249,353 acres (100,910 hectares) of land and ocean that teems with terrestrial and marine life. The National Park Service (NPS) protects the pristine resources at Channel Islands National Park by conserving, recycling, using alternative fuel vehicles, applying renewable energy, and using resources wisely. It also seeks to replace conventional fuels with renewable energy wherever possible. This applies especially to diesel fuel and petroleum, which must be shipped in from the mainland to generate electricity.

27

LED Provides Effective and Efficient Parking Area Lighting at...  

Broader source: Energy.gov (indexed) [DOE]

White Light Options for Parking Area Lighting Demonstration Assessment of Light Emitting Diode (LED) Street Lighting, Final Report Guide to FEMP-Designated Parking Lot...

28

Some factors affecting the winter range of Jasper National Park.  

E-Print Network [OSTI]

??Recent studies by Dr. I. McT. Cowan in Jasper National Park have revealed that many of the winter game ranges of the Park are heavily… (more)

Pfeiffer, Egbert Wheeler

2012-01-01T23:59:59.000Z

29

Isle Royale National Park Bibliography of Publications 1 Isle Royale National Park  

E-Print Network [OSTI]

). 14:1-63. Armentano, T. V. and O. L. Loucks. 1983. Air pollution threats to US National Parks of Publications From National Park Service NatureBib Abrams, T. 1931. Mapping Isle Royale by air. Magazine Royales forests-Rupley talks conservation. Skillings mining review. Author unknown. 1935. Isle Royale

30

Strengthening the Natural and National Park system of Iberia to conserve vascular plants  

E-Print Network [OSTI]

of the land surface would be required above and beyond the existing protected area network, currently precisely the extra required areas for the protected area system to satisfy particular goals ­ efficiency ­ National Parks ­ Natural Parks ­ plants ­ priority areas analysis ­ range-size rarity ­ reserves

Moreno Saiz, Juan Carlos

31

Geology of the Shenandoah National Park Region  

E-Print Network [OSTI]

1 Geology of the Shenandoah National Park Region 39th Annual Virginia Geological Field Conference October 2nd - 3rd, 2009 Scott Southworth U. S. Geological Survey L. Scott Eaton James Madison University Meghan H. Lamoreaux College of William & Mary William C. Burton U. S. Geological Survey Christopher M

Eaton, L. Scott

32

Environmental Impacts of Tourism in Khao Yai National Park, Thailand  

E-Print Network [OSTI]

Knowledge of visitor impacts is critical for sustainable tourism management in national parks. The focus of past tourism impact research on national parks is either on bio-physical impacts (conducted as recreation ecology research) or on social...

Phumsathan, Sangsan

2011-10-21T23:59:59.000Z

33

E-Print Network 3.0 - aketajawe-lolobata national park Sample...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Forest Inyo National Forest Los Padres National Forest Los Angeles Yosemite National Park Kings Canyon... National Park Los Angeles San Diego Winema National Forest Nevada Arizona...

34

E-Print Network 3.0 - ankarafantsika national park Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Forest Inyo National Forest Los Padres National Forest Los Angeles Yosemite National Park Kings Canyon... National Park Los Angeles San Diego Winema National Forest Nevada Arizona...

35

Manhattan Project National Historical Park  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: VegetationEquipment Surfaces and InterfacesAdministration -LowellforRatesManhattan Project National

36

What is the purpose of our national parks?  

E-Print Network [OSTI]

. Psychological needs to relieve stress in natural environments have been responsible for millions of visitors seeking recreation in National Parks and retirement communities surrounding them. Parks have been losing species since the 1920's when...

Manning, Orlinda D.

2001-01-01T23:59:59.000Z

37

MANHATTAN PROJECT NATIONAL HISTORICAL PARK | Department of Energy  

Energy Savers [EERE]

PARK MANHATTAN PROJECT NATIONAL HISTORICAL PARK Shift change at the Y-12 facility in Oak Ridge, TN, where uranium-235 was separated from uranium-238. August 1945. Shift change...

38

National Parks Move Forward on Sustainable Transportation in...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Transportation in Partnership with Clean Cities National Parks Move Forward on Sustainable Transportation in Partnership with Clean Cities March 25, 2015 - 1:13pm...

39

Energy Department and National Park Service Announce Clean Cities...  

Energy Savers [EERE]

And there are multiple benefits - we use less petroleum which saves money and reduces air pollution in America's national parks. Some of these alternative fuel vehicles are...

40

National Parks Move Transportation Forward in America's Great...  

Broader source: Energy.gov (indexed) [DOE]

the country are using alternative fuels and advanced vehicle technologies to reduce air pollution and lower fuel costs. Building on the success of its existing National Park...

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


41

Compound and Elemental Analysis At Lassen Volcanic National Park...  

Open Energy Info (EERE)

Usefulness not indicated DOE-funding Unknown References J. Michael Thompson (1985) Chemistry Of Thermal And Nonthermal Springs In The Vicinity Of Lassen Volcanic National Park...

42

Health-hazard Evaluation Report Heta 90-179-2172, National Park Service, Hawaii Volcanoes National Park, Hilo, Hawaii  

SciTech Connect (OSTI)

In response to a request from the National Park Service, an evaluation was undertaken of possible hazardous exposures to volcanic emissions, both gases and particulates, at the Hawaii Volcanoes National Park (SIC-7999) on the island of Hawaii in the State of Hawaii. Concerns included exposures to sulfur-dioxide (7446095) (SO2), asphalt decomposition products from burning pavement, acid mists when lava enters the ocean, volcanic caused smog, and Pele's hair (a fibrous glass like material). Two other related requests for study were also received in regard to civil defense workers in these areas. No detectable levels of SO2 were found during long term colorimetric detector tube sampling used to characterize park workers' personal full shift exposures. Short term detector tube samples collected near a naturally occurring sulfur vent showed SO2 levels of 1.2 parts per million (ppm). Work related symptoms reported by more than 50% of the respondents included headache, eye irritation, throat irritation, cough, and phlegm. Chest tightness or wheezing and shortness of breath were also frequently reported. Samples collected for hydrochloric-acid (7647010) and hydrofluoric-acid (7664393) recorded concentrations of up to 15ppm for the former and 1.0ppm for the latter acid. Airborne particulates in the laze plume were comprised largely of chloride salts. Airborne fibers were detected at a concentration of 0.16 fibers per cubic centimeter. The authors conclude that excessive exposure to SO2 can occur at some locations within the park. The authors recommend that workers and visitors to the park be informed of the potential for exposures.

Burr, G.A.; Stephenson, R.L.; Kawamoto, M.W.

1992-01-01T23:59:59.000Z

43

Interagency Visitor Center at Santa Monica Mountains National Recreation Area  

High Performance Buildings Database

Calabasas, CA This project was to develop the first visitor center for the Santa Monica Mountains National Recreation Area located in the Los Angeles, California area. The previous visitor center was across from a shopping mall in rental space at park headquarters in Thousand Oaks. The new facility is centrally located in the park at a much more appropriate natural and cultural resource setting. It is a partnership project with the Mountains Recreation and Conservation Authority, which is a local land conservation and park agency. It is also a joint facility with California State Parks.

44

Analysis of seasonal and day-of-week traffic patterns at national parks  

E-Print Network [OSTI]

The National Park Service (NPS) is currently contemplating the implementation of a system-wide traffic monitoring program. While several of the national parks within this network collect continuous vehicle data at multiple stations within each park...

Liggett, Lindsay Elizabeth

2009-05-15T23:59:59.000Z

45

Photovoltaics and the National Park Service : an institutional analysis  

E-Print Network [OSTI]

This paper is one of a series resulting from institutional analysis of photovoltaic (PV) acceptance. The case reported here involves the acceptance of PV by the National Park Service. As part of the Department of the ...

Nutt-Powell, Thomas E.

1980-01-01T23:59:59.000Z

46

Description and analysis of vehicle and train collisions with wildlife in Jasper National Park, Alberta Canada, 1951-1999  

E-Print Network [OSTI]

measures that have been used in Jasper National Park is alsoCOLLISIONS WITH WILDLIFE IN JASPER NATIONAL PARK, ALBERTANational Park Warden, Jasper National Park, 780-852-6235,

Bertwistle, Jim

2001-01-01T23:59:59.000Z

47

The objectives for deep scientific drilling in Yellowstone National Park  

SciTech Connect (OSTI)

The western area of the United Stated contains three young silicic calderas, all of which contain attractive targets for scientific drilling. Of the three, the Yellowstone caldera complex is the largest, has the most intense geothermal anomalies, and is the most seismically active. On the basis of scientific objectives alone. it is easily the first choice for investigating active hydrothermal processes. This report briefly reviews what is known about the geology of Yellowstone National Park and highlights unique information that could be acquired by research drilling only in Yellowstone. However, it is not the purpose of this report to recommend specific drill sites or to put forth a specific drilling proposal. 175 refs., 9 figs., 2 tabs.

Not Available

1987-01-01T23:59:59.000Z

48

Power Parks System Simulation Sandia National Laboratories  

E-Print Network [OSTI]

at a steady rate to produce hydrogen, feeding a fuel cell stack to supply electricity to a transient load of a renewable energy source. Generation by photovoltaic collectors or wind turbines can be combined with energy storage technologies. Power parks provide an excellent opportunity for using hydrogen technologies

49

Parking  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

To define policies and procedures governing the assignment, use, and management of parking spaces controlled by the Department of Energy (DOE)/National Nuclear Security Agency (NNSA) in the Forrestal Facility. Cancels HQ O 344.1 Canceled by DOE N 251.92.

2001-11-02T23:59:59.000Z

50

North Fork well, Shoshone National Forest, Park County, Wyoming  

SciTech Connect (OSTI)

Drilling of a 5000-foot exploratory gas and oil well by Marathon Oil Company is proposed for Section 34, T52N, R106W, near Pagoda Creek in the Shoshone National Forest, Park County, Wyoming. An area 75 feet by 80 feet would be cleared of all vegetation and graded nearly flat for the drill pad and reserve pit. The drilling rig, pipe rack, generator, tool house, living facilities, drilling mud pump, pit, and supply platform all would be built on the drill pad. A blooie hole would contain cuttings and dust from the air drilling. Support facilities would include a helicopter staging area along Clocktower Creek approximately one mile south of the Yellowstone Highway and a 2550-foot temporary water pipeline from Pagoda Creek to the well site. Personnel, equipment, and supplies would be trucked to the helicopter staging area and shuttled to the proposed location by helicopters. Lease stipulations prohibit drilling before September 8; therefore, the starting date would be the late fall of the respective year and would have to be completed by the following January 1. Approval of the exploratory well would not include approval of production facilities.

Not Available

1985-03-01T23:59:59.000Z

51

Overview | Savannah River National Environmental Park  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeedingOptimizing I/O performanceOtherOutreach fordefaultPark

52

Seismic mapping of alluvial fans and sub-fan bedrock in Big Bend National Park, Texas  

E-Print Network [OSTI]

Layered Models Anomalous Time-Distance Plots Error Analysis Geologic Interpretations of Results CONCLUSIONS RECOMMENDATIONS REFERENCES ~ APPENDIX VITA 7 8 10 11 16 16 18 23 29 32 32 45 47 50 52 LIST OF FIGURES Figure Page 1 Ground...-water resource investigation study area Big Bend National Park, Texas 2 Location of seismic surveys within the Big Bend study area 3 Comparison of seismic surveys to driller's logs 12 4 Hypothetical three-layer case with dipping layers 20 5 Representative...

Monti, Joseph

1984-01-01T23:59:59.000Z

53

Skeletal Pathology in Pan troglodytes schweinfurthii in Kibale National Park, Uganda  

E-Print Network [OSTI]

Skeletal Pathology in Pan troglodytes schweinfurthii in Kibale National Park, Uganda Melinda L Kibale National Park, Uganda. We compare these data with other East African populations, especially Gombe data from skele- tal remains from chimpanzees in Kibale National Park (KNP), Uganda, and compare

Pontzer, Herman

54

Going-to-the-Sun Road, Glacier National Park, MT, USA  

E-Print Network [OSTI]

Going-to-the-Sun Road, Glacier National Park, MT, USA Avalanche Path Atlas Erich H. Peitzsch Daniel..................................................................................................................................... 2 Overview of Red Rock Group avalanche paths, Going-to-the-Sun Road, Glacier National Park, MT................................................................................................................................................... 3 Overview of Lower GTSR group avalanche paths, Going-to-the-Sun Road, Glacier National Park, MT

55

Chickasaw National Recreational Area, Chickasaw, Oklahoma | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Chickasaw National Recreational Area, Chickasaw, Oklahoma Chickasaw National Recreational Area, Chickasaw, Oklahoma Photo of Comfort Station at the Chickasaw National Recreation...

56

Sustainable Infrastructure Practices Bicycle Paths & Parking Areas, Page 1 UC SANTA BARBARA  

E-Print Network [OSTI]

Sustainable Infrastructure Practices ­ Bicycle Paths & Parking Areas, Page 1 UC SANTA BARBARA Sustainable Infrastructure Practices ­ Bicycle Paths and Parking Areas Contact: Administrative Services BICYCLE PATHS AND PARKING AREAS OVERVIEW The bicycle system at UCSB is a primary element of the campus

Bigelow, Stephen

57

National Park Service | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentrating Solar Powerstories onFocus AreaDataBus JumpEnvironmental Research Institute

58

Please note: A decal-restricted area is defined as an area within which an motor vehicle may be parked if it bears the appropriate decal for that area (eg. Red, Orange, Blue, Green, etc.). Parking facilities  

E-Print Network [OSTI]

/scooter parking areas Annual -- $154.00 ($6.42/pay period) Semester -- $51.33 2014-15 Faculty and Staff DecalPlease note: A decal-restricted area is defined as an area within which an motor vehicle may be parked if it bears the appropriate decal for that area (eg. Red, Orange, Blue, Green, etc.). Parking

Mazzotti, Frank

59

Please note: A decal-restricted area is defined as an area within which an motor vehicle may be parked if it bears the appropriate decal for that area (eg. Red, Orange, Blue, Green, etc.). Parking facilities  

E-Print Network [OSTI]

/scooter parking areas Annual -- $154.00 ($6.42/pay period) Semester -- $51.33 2013-14 Faculty and Staff DecalPlease note: A decal-restricted area is defined as an area within which an motor vehicle may be parked if it bears the appropriate decal for that area (eg. Red, Orange, Blue, Green, etc.). Parking

Roy, Subrata

60

Political Economy of Compensatory Conservation: A Case Study of proposed Omkareshwar National Park Complex, India  

E-Print Network [OSTI]

Proposed Omkareshwar National Park Complex (ONPC), is a planned park in Madhya Pradesh (central India) that is being designed as a compensatory conservation plan to overcome the loss of wildlife and forest by the construction and submergence from...

Goel, Abhineety

2013-08-08T23:59:59.000Z

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


61

AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Grand Canyon National Park  

SciTech Connect (OSTI)

This report focuses on the Grand Canyon National Park (GCNP) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively PEVs) can fulfill the mission requirements.

Stephen Schey; Jim Francfort; Ian Nienhueser

2014-08-01T23:59:59.000Z

62

Assessment of Nonnative Invasive Plants in the DOE Oak Ridge National Environmental Research Park  

SciTech Connect (OSTI)

The Department of Energy (DOE) National Environmental Research Park at Oak Ridge, Tennessee, is composed of second-growth forest stands characteristic of much of the eastern deciduous forest of the Ridge and Valley Province of Tennessee. Human use of natural ecosystems in this region has facilitated the establishment of at least 167 nonnative, invasive plant species on the Research Park. Our objective was to assess the distribution, abundance, impact, and potential for control of the 18 most abundant invasive species on the Research Park. In 2000, field surveys were conducted of 16 management areas on the Research Park (14 Natural Areas, 1 Reference Area, and Walker Branch Watershed) and the Research Park as a whole to acquire qualitative and quantitative data on the distribution and abundance of these taxa. Data from the surveys were used to rank the relative importance of these species using the ''Alien Plant Ranking System, Version 5.1'' developed by the U.S. Geological Survey. Microstegium (Microstegium vimineum) was ranked highest, or most problematic, for the entire Research Park because of its potential impact on natural systems, its tendency to become a management problem, and how difficult it is to control. Microstegium was present in 12 of the 16 individual sites surveyed; when present, it consistently ranked as the most problematic invasive species, particularly in terms of its potential impact on natural systems. Japanese honeysuckle (Lonicera japonica) and Chinese privet (Ligustrum sinense) were the second- and third-most problematic plant species on the Research Park; these two species were present in 12 and 9 of the 16 sites surveyed, respectively, and often ranked second- or third-most problematic. Other nonnative, invasive species, in decreasing rank order, included kudzu (Pueraria montma), multiflora rose (Rosa multiflora), Chinese lespedeza (Lespedeza cuneara), and other species representing a variety of life forms and growth forms. Results of this research can be used to prioritize management and research activities related to these invasive taxa on the Research Park as a whole and for specific Natural or Reference Areas. Additional research on the autecology and synecology of each species surveyed is suggested. In particular, research should focus on assessing the impacts of these species on the invaded plant and animal communities and ecosystems. Finally, this ranking system could be used to similarly rank the many other nonnative, invasive species present on the Research Park not included in this study.

Drake, S.J.

2002-11-05T23:59:59.000Z

63

The role of cemeteries in the development of municipal and national military parks: the cemetery-park connection  

E-Print Network [OSTI]

This thesis examines how cemeteries, both municipal and military, have developed in America based on internal and external influences and the role that they have played in the development of municipal and national military parks, respectively...

White, Carlton J

1995-01-01T23:59:59.000Z

64

Biological Inventory Colorado Canyons National Conservation Area  

E-Print Network [OSTI]

Biological Inventory of the Colorado Canyons National Conservation Area Prepared by: Joe Stevens .............................. 12 Identify Targeted Inventory Areas

65

Visitors' attitudes toward the maintenance, preservation and development of Ichkeul National Park, Tunisia  

E-Print Network [OSTI]

on citizens' attitudes and behaviors to support park maintenance. Ichkeul National Park includes a variety of natural resources. Individual resource use at Ichkeul today will determine whether or not resources will be available for all Tunisians... nearly tripled (International Union for the Conservation of Nature, 1971; 1985). In many nations, the concept of a national park is foreign, part of the inundation of ideas recently introduced to the society. Citizens who have traditional uses...

Nelson, Alanna Lee

2012-06-07T23:59:59.000Z

66

E-Print Network 3.0 - archipelago national park Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

et al., 1996), St Lawrence Islands National Park at the eastern... archipelagoes (Lake Erie, St Lawrence, Georgian Bay, Apostle) in the Laurentian Great Lakes of North America......

67

The plight of the parklands. [Exploration, development and pollution of National Parks  

SciTech Connect (OSTI)

As Congress continues its debate on the Clean air Act, concern over air pollution, aesthetic deterioration, and encroaching development in national parks is being expressed by many factions. Park superintendants themselves cite increasing threats of irreversible damage. A case study is presented of the Golden Circle of southwestern national parks, current attempts to regulate oil, gas and uranium exploration there, and the consequences of various proposals to protect these public lands. (JMT)

Rudzitis, G.; Schwartz, J.

1982-10-01T23:59:59.000Z

68

DOE Designates Southwest Area and Mid-Atlantic Area National...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Interest Electric Transmission Corridors DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors October 2, 2007 - 11:12am Addthis...

69

A Publication of the Savannah River Ecology Laboratory National Environmental Research Park Program  

E-Print Network [OSTI]

A Publication of the Savannah River Ecology Laboratory National Environmental Research Park Program of the Savannah River Site National Environmental Research Park Program SRO-NERP-28 2005 Prepared under the auspices of The University of Georgia Savannah River Ecology Laboratory P.O. Drawer E Aiken, South Carolina

Georgia, University of

70

Eighty years of change: vegetation in the montane ecoregion of Jasper National Park, Alberta,  

E-Print Network [OSTI]

Eighty years of change: vegetation in the montane ecoregion of Jasper National Park, Alberta and dis- tribution in the montane ecoregion of Jasper National Park, in the Rocky Mountains of Alberta parc natio- nal de Jasper, situé dans les Montagnes Rocheuses en Alberta, au Canada. Une approche

Macdonald, Ellen

71

Himalayan Semnopithecus entellus at Langtang National Park, Nepal: Diet, Activity Patterns,  

E-Print Network [OSTI]

Himalayan Semnopithecus entellus at Langtang National Park, Nepal: Diet, Activity Patterns provide foraging data from a field study of Himalayan langurs in Langtang National Park, Nepal at 3000. Bishop (1975, 1979) investigated langur social behavior at Melemchi, north-central Nepal (2442­ 3050 m

Norconk, Marilyn A.

72

BOTANICAL SURVEY OF WINTER PARK RESORT, ARAPAHO NATIONAL FOREST, GRAND COUNTY, COLORADO  

E-Print Network [OSTI]

BOTANICAL SURVEY OF WINTER PARK RESORT, ARAPAHO NATIONAL FOREST, GRAND COUNTY, COLORADO Colorado Natural Heritage Program College of Natural Resources, 8002 Campus Delivery Colorado State University Fort Collins, Colorado 80523-8002 #12;BOTANICAL SURVEY OF WINTER PARK RESORT, ARAPAHO NATIONAL FOREST, GRAND

73

Predicting Incursion of Plant Invaders into Kruger National Park, South Africa: The Interplay of General  

E-Print Network [OSTI]

Predicting Incursion of Plant Invaders into Kruger National Park, South Africa: The Interplay, South African National Parks, Skukuza, South Africa, 4 Centre for Invasion Biology, Department of Botany and Zoology, Stellenbosch University, Stellenbosch, South Africa, 5 Department of Plant Science, University

KratochvĂ­l, Lukas

74

A Publication of the Savannah River Ecology Laboratory National Environmental Research Park Program  

E-Print Network [OSTI]

, ".' .-.' .; . " c. ':-, A Publication of the Savannah River Ecology Laboratory National Laboratory A Publication of the Savannah River National Environmental Research Park 1988 , Present Address, 1988 Copies my be obtained from Savannah River Ecology Laboratory #12;#12;SEASONAL DYNAMICS OFBENTHIC

Georgia, University of

75

Effects of Podcast Tours on Tourists' Experiences in a National Park  

E-Print Network [OSTI]

OF PHILOSOPHY December 2009 Major Subject: Recreation, Park, and Tourism Sciences EFFECTS OF PODCAST TOURS ON TOURISTS? EXPERIENCES IN A NATIONAL PARK A Dissertation by MYUNG HWA KANG Submitted to the Office of Graduate Studies of Texas A&M University in partial...: Recreation, Park, and Tourism Sciences iii ABSTRACT Effects of Podcast Tours on Tourists? Experiences in a National Park. (December 2009) Myung Hwa Kang, B.A., Yonsei University at Seoul, Korea; M.S., Purdue University Chair of Advisory Committee: Dr. Ulrike...

Kang, Myung Hwa

2011-02-22T23:59:59.000Z

76

The application of GIScience to Search and Rescue in Yosemite National Park  

E-Print Network [OSTI]

The application of GIScience to Search and Rescue in Yosemite National Park Paul Doherty UC Merced PhD Student Yosemite National Park GISS/Park Ranger NSF #1031914 What is a Park Ranger? • NPS Mission: conserve the scenery the...Re?group Load assignments onto GPS units 3.6. Provide Ops and Search TeamsGPS unit download, OtiDbif with assignment mapsPlot GPS tracks and clues 4.5. OperationsDebr e Real?time GPS unit tracking Clue logging * The GISS falls...

Doherty, Paul

2010-11-18T23:59:59.000Z

77

Arizona State Park's Natural Area Program1 Patricia M. Bergthold2  

E-Print Network [OSTI]

of the identified Natural Areas contain riparian elements. Developing protective strategies, coop eration areas, to recommend protective measures, and to register protected sites. NATURAL AREA PROGRAM STRUCTUREArizona State Park's Natural Area Program1 Patricia M. Bergthold2 Abstract.--A Natural Area Program

78

An assessment of natural history representation in Texas state parks and natural areas  

E-Print Network [OSTI]

used as a pattern for format and style was Leisure Sciences. of citizens of as well as visitors to the state. These areas range from large parks of several thousand acres in size, which preserve natural landscapes and provide outdoor recreation.... 25. 26. 27. Marine Environments EStuaries Underground Ecosystems Lakes and Ponds Streams Table 2. Texas State Parks and Natural Areas PARK AREA COUNTY 1. 2. 3. 5. 6. 7. 8, 10. 11. 12. 13. 14. 15, 16. 17. 18. 19. 20. 21. 22...

Bishop, Glen Robert

1985-01-01T23:59:59.000Z

79

"Hot Water" in Lassen Volcanic National Park--Fumaroles, Steaming Ground, and Boiling Mudpots  

E-Print Network [OSTI]

"Hot Water" in Lassen Volcanic National Park-- Fumaroles, Steaming Ground, and Boiling Mudpots U, ydrothermal (hot water) and steaming ground. These features are re- lated to active volcanism, the largest fumarole (steam and volcanic-gas vent) in the park. The temperature of the high-velocity steam

Torgersen, Christian

80

Spatial Dynamics of Elephant Impacts on Trees in Chobe National Park, Botswana.  

E-Print Network [OSTI]

??SPATIAL DYNAMICS OF ELEPHANT IMPACTS ON TREES IN CHOBE NATIONAL PARK, BOTSWANA Timothy Jon Fullman 714-381-5337 School of Natural Resources and Environment Supervisory chair: Brian… (more)

Fullman, Timothy

2009-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


81

Exploring Spatial Variations in the Relationship between National Park Visitation and Associated Factors in Texas Counties  

E-Print Network [OSTI]

within the Texas boundary. Specifically, this study developed a spatial regression model of national park visitation demand in Texas using Geographically Weighted Regression (GWR). This model estimated the strength of the relationship between visitation...

Lee, Kyung Hee

2013-11-07T23:59:59.000Z

82

The application of a cognitive mapping and user analysis methodology to neighborhood park service area  

E-Print Network [OSTI]

geographic and social basis. The data will further help researchers and city planners identify the images that urban residents have toward their neighborhoods and the parks located within these areas. HYPOTHESES ANO ASSUHPTIONS The nature of the study...THE APPLICATION OF A COGNITIVE MAPPING ANO USER ANALYSIS METHODOLOGY TO NEIGHBORHOOD PARK SERVICE AREA DIFFERENTIATION A Thesis by LAWRENCE REED MUTTER Submitted to the Graduate College of Texas ASM University in partial fulfillment...

Mutter, Lawrence Reed

2012-06-07T23:59:59.000Z

83

Parking  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearch Welcome to the Pacific Northwest NationaltoParking Parking

84

Lamar Buffalo Ranch, Yellowstone National Park, Wyoming | Department...  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

Lamar Buffalo Ranch, a ranch that was set up in the early 1900s to breed buffalo for replacement stock within the park during a time when their numbers were very low. The ranch...

85

Parking  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

The Order defines policies and procedures governing the assignment, use, and management of parking spaces controlled by DOE/NNSA in the Forrestal Facility. Administrative changes have been made to update content. Canceled by DOE N 251.92. Cancels HQ O 344.1.

2001-11-02T23:59:59.000Z

86

Investigation of exfoliation joints in Navajo sandstone at the Zion National Park and in granite at the Yosemite National Park by tectonofractographic techniques  

SciTech Connect (OSTI)

Tectonofractographic techniques have been applied to the study of joint exfoliation in the Navajo sandstone at Zion National Park and in the granite at Yosemite National Park. New types of fracture surface morphologies have been observed which enabled the discerning of incipient joints and consequent fracture growth in these rocks. Incipient jointing in the sandstone is mostly manifested by elliptical and circular fractures (meters to tens meters across) initiating from independent origins. They interfere with each other and grow to larger circular fractures producing exfoliation surfaces up to hundreds of meters across. Less frequently, series of large concentric undulations demonstrate the propagation of a large fracture front producing exfoliation from an individual origin. One such fracture front reveals refraction of undulations at a layer boundary. Certain en echelon fringes surround the joint mirror plane with well defined rims of en echelons and hackles which enable the determination of the tensile fracture stress, {sigma}f. Arches in Zion National Park are ubiquitous in shape and size, revealing stages in their evolution by a mechanical process, which was associated with exfoliation, but independent of local faulting. Exfoliation and arching mostly occurred on vertical surfaces of N-NNW and NE sets of prominent joints, but there are also deviations from this general trend. In Yosemite National Park large exfoliations (hundreds of meters in size) developed on the El Capitan cliff by the interaction and merging of many previous smaller incipient joints that vary in size from meters to tens of meter.

Bahat, D.; Grossenbacher, K.; Karasaki, K.

1995-04-01T23:59:59.000Z

87

God Alone Can Make a National Park" the 1930 visit of the national park service officials to the smokies  

E-Print Network [OSTI]

dignitaries. The kickoff event on Monday, October 6, was a banquet at the Battery Park Hotel, the largest Smokies And Biltmore House." Harlan Kelsey, Roy Lyman Sexton, Arno Cammerer, and Horace Albright

Perfect, Ed

88

Solar energy system performance evaluation: seasonal report for Colt Yosemite, Yosemite National Park, California  

SciTech Connect (OSTI)

The Solar Energy System, Colt Yosemite, was designed to provide 52% of the heating (2500 sq ft area) for the Visitors Center at Yosemite National Park, California. The system consists of 980 sq ft of Colt A-151 series flat-plate liquid collectors, a petroleum-base thermal energy transport fluid, a 2500 gallon water-filled solar energy storage tank, heat exchangers, pumps, controls and associated plumbing. Solar heated water is pumped through a liquid-to-air heat exchanger in the space heating supply duct. Auxiliary hot water is provided from an oil-fired boiler to a second liquid-to-air heat exchanger when the solar energy is not sufficient to meet the space heating demand. There are four modes of system operation.

None

1980-08-01T23:59:59.000Z

89

Green Energy Parks Program  

Broader source: Energy.gov [DOE]

Presentation covers the National Park Services Green Energy Parks program given at the FUPWG Spring 2008 meeting in Destin, Florida.

90

Assessment of Inundation Risk from Sea Level Rise and Storm Surge in Northeastern Coastal National Parks  

E-Print Network [OSTI]

Assessment of Inundation Risk from Sea Level Rise and Storm Surge in Northeastern Coastal National of inundation risk from sea level rise and storm surge in northeastern coastal national parks. Journal of Coastal Research, 00(0), 000­000. Coconut Creek (Florida), ISSN 0749-0208. Sea level rise and an increase

Wang, Y.Q. "Yeqiao"

91

The effect of elephant utilisation on the Sterculia rogersii and Adsonia digitata populations of the Kruger National Park.  

E-Print Network [OSTI]

??This study assesses elephant induced damage and mortality of baobab and common star-chestnut trees in the northern Kruger National Park. Comparisons are made between the… (more)

Kelly, Henry Lyle Patrick

2006-01-01T23:59:59.000Z

92

Nitrogen and Sulfur in Rocky Mountain National Park  

E-Print Network [OSTI]

a variety of air pollution sources, including automobiles, power plants, industry, agriculture, and fires in nitrogen deposition in mountain ecosys- tems. Power plants and other point sources 26% Motor vehicles 25 threats to aquatic and terrestrial resources in the park. Lakes and streams have low concentrations

Fischer, Emily V.

93

Parking  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 - September 2006 TheSteven Ashby Dr.presentations PapersParking Print Finding a

94

AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Fort Vancouver National Historic Site  

SciTech Connect (OSTI)

Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for the U.S. Department of Energy’s Advanced Vehicle Testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (ITSNA) to collect data on federal fleet operations as part of the Advanced Vehicle Testing Activity’s Federal Fleet Vehicle Data Logging and Characterization study. The Advanced Vehicle Testing Activity study seeks to collect data to validate the use of advanced electric drive vehicle transportation. This report focuses on the Fort Vancouver National Historic Site (FVNHS) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of electric vehicles (EVs) into the agencies’ fleet. Individual observations of the selected vehicles provided the basis for recommendations related to EV adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles) could fulfill the mission requirements. FVNHS identified three vehicles in its fleet for consideration. While the FVNHS vehicles conduct many different missions, only two (i.e., support and pool missions) were selected by agency management to be part of this fleet evaluation. The logged vehicles included a pickup truck and a minivan. This report will show that BEVs and PHEVs are capable of performing the required missions and providing an alternative vehicle for both mission categories, because each has sufficient range for individual trips and time available each day for charging to accommodate multiple trips per day. These charging events could occur at the vehicle’s home base, high-use work areas, or in intermediate areas along routes that the vehicles frequently travel. Replacement of vehicles in the current fleet would result in significant reductions in emission of greenhouse gases and petroleum use, while also reducing fuel costs. The Vancouver, Washington area and neighboring Portland, Oregon are leaders in adoption of PEVs in the United States1. PEV charging stations, or more appropriately identified as electric vehicle supply equipment, located on the FVNHS facility would be a benefit for both FVNHS fleets and general public use. Fleet drivers and park visitors operating privately owned plug-in electric vehicles benefit by using the charging infrastructure. ITSNA recommends location analysis of the FVNHS site to identify the optimal station placement for electric vehicle supply equipment. ITSNA recognizes the support of Idaho National Laboratory and ICF International for their efforts to initiate communication with the National Parks Service and FVNHS for participation in this study. ITSNA is pleased to provide this report and is encouraged by the high interest and support from the National Park Service and FVNHS personnel

Stephen Schey; Jim Francfort

2014-03-01T23:59:59.000Z

95

Activists protest National Parks proposal to profit from microbes National parks in the US are usually teeming  

E-Print Network [OSTI]

January. They expect to publish the final environmental impact statement in the spring and make a decision of the proposed projects' environmental impact. Over the next six years, the agency drafted an assessment of environmental impact for all the parks. The agency supports a plan that would allow companies to take samples

Cai, Long

96

www.sciencemag.org SCIENCE VOL 320 13 JUNE 2008 1419 6. National Parks Board Singapore, National Parks Board  

E-Print Network [OSTI]

Potential of Renewable Energy. Also, the U.S. Department of Energy's Office of Energy Efficiency Parks Board Annual Report 2005­2006 Facts and Figures (www.nparks.gov.sg/imgs/pdfs/05/005- Facts&Figures.pdf). 7. General Motors et al., Well-to-Wheel Analysis of Energy Use and Greenhouse Gas Emissions

Minnesota, University of

97

VEGETATIVE CHARACTERISTICS OF PRONGHORN BED SITES IN WIND CAVE NATIONAL PARK, SOUTH DAKOTA --Much of the previous  

E-Print Network [OSTI]

49 NOTES VEGETATIVE CHARACTERISTICS OF PRONGHORN BED SITES IN WIND CAVE NATIONAL PARK, SOUTH DAKOTA mortality (Beale 1978, Barrett 1984, Gregg et al. 2001) and social behavior (Kitchen 1974, Autenrieth. The pronghorn was reintroduced into Wind Cave National Park, South Dakota, in 1914 and thus, has been maintained

98

National Parks Roll on With Alternative Fuels | Department of Energy  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy HealthCommentsAugust 2012NEVADAEnergyEnergyParks Roll on With

99

Culling and the dynamics of the Kruger National Park African elephant population  

E-Print Network [OSTI]

Culling and the dynamics of the Kruger National Park African elephant population INTRODUCTION For 30 years, managers have promoted culling as a man- agement tool for African elephant populations of elephant culling as a means of curtailing the anticipated destruction of the vegetation in the Kruger

Pretoria, University of

100

A PUBLICATION OF DOE'S SAVANNAH RIVER SITE NATIONAL ENVIRONMENTAL RESEARCH PARK  

E-Print Network [OSTI]

#12;A PUBLICATION OF DOE'S SAVANNAH RIVER SITE NATIONAL ENVIRONMENTAL RESEARCH PARK April 1990 River Ecology Laboratory Drawer E Aiken, SC 29802 USA #12;VEGETATION OF THE SAVANNAH RIVER SITE: MAJOR COMMUNITY TYPES Sarah W. Workman Kenneth W. McLeod Savannah River Ecology Laboratory A Publication

Georgia, University of

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


101

Drought triggered tree mortality in mixed conifer forests in Yosemite National Park, California, USA  

E-Print Network [OSTI]

such as fire or wind- throw may be identified easily, longer periods of elevated tree mortality are usuallyDrought triggered tree mortality in mixed conifer forests in Yosemite National Park, California form 26 July 2005; accepted 26 July 2005 Abstract Tree mortality is an important process causing forest

Taylor, Alan

102

Effects of forestry practices on vegetation structure and bird community of Kibale National Park, Uganda  

E-Print Network [OSTI]

, Uganda Cagan H. Sekercioglu* Center for Conservation Biology, Department of Biological Sciences, Stanford on the vegetation structure and bird community of Kibale National Park, Uganda. I compared four forest treatments Ltd. All rights reserved. Keywords: Uganda; Tropical forestry; Selective logging; Vegetation structure

Sekercioglu, Cagan Hakki

103

In Cooperation with the National Park Service Water Quality Program Biogeochemical Processes in an Urban, Restored  

E-Print Network [OSTI]

In Cooperation with the National Park Service Water Quality Program Biogeochemical Processes in an Urban, Restored Wetland of San Francisco Bay, California, 2007­ 2009: Methods and Data for Plant, Sediment, and Water Parameters By Lisamarie Windham-Myers, Mark C. Marvin-DiPasquale, Jennifer L. Agee, Le

104

RURAL-FRONTIER MIGRATION AND DEFORESTATION IN THE SIERRA DE LACANDON NATIONAL PARK, GUATEMALA  

E-Print Network [OSTI]

RURAL-FRONTIER MIGRATION AND DEFORESTATION IN THE SIERRA DE LACANDON NATIONAL PARK, GUATEMALA Robinson #12;ii © 2002 David L. Carr ALL RIGHTS RESERVED #12;iii ABSTRACT DAVID L. CARR: Rural-frontier the greatest risk for migration to the frontier. Evidently, attention to both migration origin and destination

Lopez-Carr, David

105

LONG-EARED OWLS NESTING IN BADLANDS NATIONAL PARK by Deborah D. Paulson  

E-Print Network [OSTI]

LONG-EARED OWLS NESTING IN BADLANDS NATIONAL PARK by Deborah D. Paulson and Carolyn Hull Sieg USDA Rocky Mountain Forest and Range Experiment Station Rapid City 57701 Long-eared Owls nest at high River, few nesting records have been reported. This paper reports the occurrence of Long-eared Owls

106

A hydrogeological evaluation of alluvial fans in northern Big Bend National Park, Texas, using geophysical methods  

E-Print Network [OSTI]

OF THE SEISMIC AND RESISTIVITY DATA INTERPRETATIONS CONCLUSIONS REFERENCES. APPENDIX. VITA. Page viii ix 9 11 11 15 16 17 17 19 24 28 35 40 46 46 48 52 52 54 55 59 92 97 100 104 106 LIST OF TABLES Table Page True seism1c... Representative four-layer case from the Big Bend Park study area 33 Frequency distribution of seismic velocities. . 34 10 Anomalous time-distance plots from the Bio Bend Park study area 37 Comparison of results from seismic sounding to driller's logs from...

Archer, Jerry Alan

1982-01-01T23:59:59.000Z

107

Rural groundwater supply for the Volcanoes National Park region, Rwanda  

E-Print Network [OSTI]

Water scarcity is a major issue faced by both developed and developing countries. According to the Millennium Development Goals set by the United Nations, the number of people that do not have access to an improved water ...

Zoghbi, Christiane A. (Christiane Antoine)

2007-01-01T23:59:59.000Z

108

Motorcycle and Moped Parking Map Moped Parking Only  

E-Print Network [OSTI]

Motorcycle and Moped Parking Map Moped Parking Only Motorcycle and Moped Parking All motorcycles and mopeds are required to have a valid UVa Parking Permit to park in designated motorcycle and/or moped parking spaces. Motorcycles and Mopeds may also park in BLUE parking areas, such as the commuter parking

Acton, Scott

109

Geothermometry At Lassen Volcanic National Park Area (Janik ...  

Open Energy Info (EERE)

sample taken had a pH of 8.35 and contained 2100 ppm Cl and 0.55 ppm NH3. Ratios of Na+K+ and Na+Cl remained nearly constant throughout the flow test. Cation geothermometers...

110

Lassen Volcanic National Park Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429Lacey, Washington:Lakeville, MN) JumpLarderello GeothermalTresLassen

111

Compound and Elemental Analysis At Lassen Volcanic National Park Area  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentratingRenewable Solutions LLC Jump to: navigation, search

112

Compound and Elemental Analysis At Lassen Volcanic National Park Area  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentratingRenewable Solutions LLC Jump to: navigation, search(Thompson, 1985) | Open Energy

113

Geothermometry At Lassen Volcanic National Park Area (Janik & Mclaren,  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation, searchGeaugaInformation Mexico - AInformation Hot2010) | Open

114

Geothermometry At Lassen Volcanic National Park Area (Thompson, 1985) |  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation, searchGeaugaInformation Mexico - AInformation Hot2010) | OpenOpen

115

Lassen Volcanic National Park Geothermal Area | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 No revision hasInformation Earth's Heat JumpInc Place:Keystone Clean AirjoinLakeshoreLambLangdonLaredoJump to:

116

Idaho National Laboratory Vadose Zone Research Park Geohydrological Monitoring Results  

SciTech Connect (OSTI)

Vadose zone lithology, hydrological characterization of interbed sediments, and hydrological data from subsurface monitoring of Idaho Nuclear Technology and Engineering Center wastewater infiltration are presented. Three-dimensional subsurface lithology of the vadose zone beneath the Vadose Zone Research Park is represented in a 2 dimensional (2 D) diagram showing interpolated lithology between monitoring wells. Laboratory-measured values for saturated hydraulic conductivity and porosity are given for three major interbeds, denoted as the B BC interbed (20 to 35 m bls), the C D interbed (40 to 45 m bls), and the DE 1 2 interbed (55 to 65 m bls), along with an overall physical description of the sediments and geologic depositional environments. Pre-operational pore water pressure conditions are presented to show the presence and location of perched water zones before pond discharge at the New Percolation Ponds. Subsurface infiltration conditions during initial high-volume discharge are presented to show water arrival times and arrival sequences. Steady-state conditions are then presented to show formation and locations of perched water zones and recharge sources after several months of discharge to the New Percolation Ponds.

Kristine Baker

2006-01-01T23:59:59.000Z

117

Wildlife conservation and reduced emissions from deforestation in a case study of Nantu National Park,  

E-Print Network [OSTI]

more effective than the PAs without international investment. In contrast with the recent hopes Park, Sulawesi 1. The effectiveness of forest protection--many measures, one goal Ewan A. Macdonald a o Published on line 3 April 2011 Keywords: Protected area Sulawesi REDD Wildlife conservation

Malhi, Yadvinder

118

Riparian mammals in Big Bend National Park and their interrelationships with visitor usages and impacts  

E-Print Network [OSTI]

. , 1944; McDougall and Sperry, 1951; Denyes, 1956; and Warnock and Kittams, 1970). The Chisos Mountains support dense stands of Mexican Pinyon-Oak-Juniper and Ponderosa Pine- Douglas Fir woodlands (for a list of scientific names of all plants... research work. Studies involving mammals of the Big Bend area began with gene. al surveys (Bailey, 1905; Johnson, 1936; Borell and Bryant, 1942; and Taylor et al. , 1944) designed to identify and document the varied fauna of the area. After the park...

Boeer, William Jacob

1977-01-01T23:59:59.000Z

119

Driving the National Parks Forward | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTanklessDOJ TitleDr. Steven Chu About Us Dr. Steven Chuthe National

120

Characterization of Habitat for Hawksbill Turtle (Eretmochelys imbricata) in Los Roques Archipelago National Park, Venezuela  

E-Print Network [OSTI]

CHARACTERIZATION OF HABITAT FOR HAWKSBILL TURTLE (Eretmochelys imbricata) IN LOS ROQUES ARCHIPELAGO NATIONAL PARK, VENEZUELA A Thesis by LUCIANA ESTELA HUNT Submitted to the Office of Graduate Studies of Texas A&M University..., VENEZUELA A Thesis by LUCIANA ESTELA HUNT Submitted to the Office of Graduate Studies of Texas A&M University in partial fulfillment of the requirements for the degree of MASTER OF SCIENCE Approved by: Chair of Committee, William D. Heyman...

Hunt, Luciana E.

2010-10-12T23:59:59.000Z

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


121

Hot Springs National Park Space Heating Low Temperature Geothermal Facility  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to: navigation,Ohio:GreerHi GtelHomer, Alaska:Horace,Geothermal Area Jump to: navigation,|

122

Estimating Biomass in the Mountain Regions of Bwindi Impenetrable National Park, Uganda using Radar and Optical Remote Sensing   

E-Print Network [OSTI]

Field measured estimates of aboveground biomass (AGB) for 15 transects in Bwindi Impenetrable National Park (BINP), Uganda were used to generate a number of prediction models for estimating aboveground biomass (AGB) over the full extent of BINP. AGB...

Fedrigo, Melissa

2009-11-26T23:59:59.000Z

123

Energy Department and National Park Service Announce Clean Cities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area. TheEPSCI Home It is Partnerships Storage andof

124

Energy Department and National Park Service Announce Clean Cities  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area. TheEPSCI Home It is Partnerships Storage

125

Free Parking Free Parking  

E-Print Network [OSTI]

Free Parking Free Parking Free Parking Free Parking Free Parking FreeParking(9.15-4.30) Free (sites marked P above) is by permit only. Free parking is available on surrounding roads (on Mayfield

Millar, Andrew J.

126

National parking  

E-Print Network [OSTI]

The mobility afforded by the rise of the information era solicits a reexamination of possible modes of mobile living. Mobility has always been closely tied to American life. Westwaid expansion defined United States history ...

Ihara, Toshiro, M. Arch. Massachusetts Institute of Technology

2014-01-01T23:59:59.000Z

127

Aerial photographic monitoring of spruce damage in Bayerischer Wald National Park, Federal Republic of Germany  

E-Print Network [OSTI]

) August, 1989 Forest damage or '%aldschaden" has became a matter of increasing ~ in ~ ~. In 1983, 34 ~ of the forests of the F~ ~lic of ~ were found to be affected. In Southern ~'s state of Bavaria, 45 percent of the forests were found... to be In an attempt to detecnine the rate at which the forest ~ phenomenon ? particularly with ~ to Norway spruce (Picea abies Karst. ) ? is wo~ in Bayerischer Weld National Park, an air photo interpretation study was conducted utilizing large scale 1:3000 color...

Goebel, John Martin

1989-01-01T23:59:59.000Z

128

Research Areas | National Nuclear Security Administration  

National Nuclear Security Administration (NNSA)

High Energy Density Laboratory Plasmas Research Areas Research Areas High Energy Density Laboratory Plasmas (HEDLP) Research Areas During open solicitations proposals are sought...

129

Climate change scenario planning in Alaska's National Parks: Stakeholder involvement in the decision-making process  

SciTech Connect (OSTI)

This article studies the participation of stakeholders in climate change decision-making in Alaska s National Parks. We place stakeholder participation within literatures on environmental and climate change decision-making. We conducted participant observation and interviews in two planning workshops to investigate the decision-making process, and our findings are three-fold. First, the inclusion of diverse stakeholders expanded climate change decision-making beyond National Park Service (NPS) institutional constraints. Second, workshops of the Climate Change Scenario Planning Project (CCSPP) enhanced institutional understandings of participants attitudes towards climate change and climate change decision-making. Third, the geographical context of climate change influences the decisionmaking process. As the first regional approach to climate change decision-making within the NPS, the CCSPP serves as a model for future climate change planning in public land agencies. This study shows how the participation of stakeholders can contribute to robust decisions, may move climate change decision-making beyond institutional barriers, and can provide information about attitudes towards climate change decision-making.

Ernst, Kathleen M [ORNL] [ORNL; Van Riemsdijk, Dr. Micheline [University of Tennessee (UT)] [University of Tennessee (UT)

2013-01-01T23:59:59.000Z

130

Climate Change Scenario Planning in Alaska's National Parks: Stakeholder Involvement in the Decision-Making Process  

SciTech Connect (OSTI)

This article studies the participation of stakeholders in climate change decision-making in Alaska s National Parks. We place stakeholder participation within literatures on environmental and climate change decision-making. We conducted participant observation and interviews in two planning workshops to investigate the decision-making process, and our findings are three-fold. First, the inclusion of diverse stakeholders expanded climate change decision-making beyond National Park Service (NPS) institutional constraints. Second, workshops of the Climate Change Scenario Planning Project (CCSPP) enhanced institutional understandings of participants attitudes towards climate change and climate change decision-making. Third, the geographical context of climate change influences the decision-making process. As the first regional approach to climate change decision-making within the NPS, the CCSPP serves as a model for future climate change planning in public land agencies. This study shows how the participation of stakeholders can contribute to robust decisions, may move climate change decision-making beyond institutional barriers, and can provide information about attitudes towards climate change decision-making.

Ernst, Kathleen M [ORNL] [ORNL; Van Riemsdijk, Dr. Micheline [University of Tennessee (UT)] [University of Tennessee (UT)

2013-01-01T23:59:59.000Z

131

Protected Areas in a Changing World: 147 Proceedings of the 2013 George Wright Society Conference on Parks, Protected Areas, and Cultural Sites  

E-Print Network [OSTI]

Protected Areas in a Changing World: · 147 Proceedings of the 2013 George Wright Society Conference in a Changing World: Proceedings of the 2013 George Wright Society Conference on Parks, Protected Areas, and Cultural Sites. Hancock, Michigan: George Wright Society. © 2014 George Wright Society. All rights reserved

132

EA-1640: Transfer of Land and Facilities within the East Tennessee Technology Park and Surrounding Area, Oak Ridge, Tennessee  

Broader source: Energy.gov [DOE]

DOE’s Oak Ridge Operations Office issued a final EA and a finding of no significant impact for a proposal to convey DOE property located at the East Tennessee Technology Park and the surrounding area to the Community Reuse Organization of East Tennessee, City of Oak Ridge, other agencies, or private entities for mixed use economic development.Public Comment Opportunities.

133

Environmental Research Park  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Attractions and Events Area Geography Area History Area Links Driving Directions Idaho Falls Attractions and Events INL History INL Today Research Park Sagebrush Steppe...

134

Public perceptions of, and attitudes toward, crime in the parks of a major metropolitan area  

E-Print Network [OSTI]

levels. It was found that some types of illegal activity (such as shooting guns) had a potential strong negative impact on park visitation but that often crimes with the strongest potential were perceived to seldom or never occur. Crimes that were... Frequency of Shooting Guns in Austin Parks by those Respondents Most Negatively Influenced by this Illegal Activity 53 Perceived Frequency of Murder in Austin Parks by those Respondents Most Negatively Influenced by this Illegal Activity. 53 Perceived...

Conway, Kenneth Lee

1980-01-01T23:59:59.000Z

135

Tenant Guidelines National Park Service and the U.S. Department of Energy, Federal Energy Management Program  

E-Print Network [OSTI]

Tenant Guidelines National Park Service and the U.S. Department of Energy, Federal Energy Management Program for Energy-Efficient Renovation of Buildings at the Presidio of San Francisco #12 like to thank the following reviewers for their comments: Anne Sprunt Crawley, Federal Energy

Diamond, Richard

136

Please cite this article in press as: Hart, S.J., Laroque, C.P., Searching for thresholds in climateradial growth rela-tionships of Engelmann spruce and subalpine fir, Jasper National Park, Alberta, Canada. Dendrochronologia (2012),  

E-Print Network [OSTI]

in climate­radial growth rela- tionships of Engelmann spruce and subalpine fir, Jasper National Park, Alberta for thresholds in climate­radial growth relationships of Engelmann spruce and subalpine fir, Jasper National Park

Walters, Bradley B.

137

Nevada National Security Site Underground Test Area (UGTA) Flow...  

Office of Environmental Management (EM)

December 12, 2014 To view all the P&RA CoP 2014 Technical Exchange Meeting videos click here. Video Presentation Nevada National Security Site Underground Test Area...

138

EMPLOYEES U-PASS & Parking Permits Shaded area to be completed by Cashier Office  

E-Print Network [OSTI]

Motorcycle Parking Permit * (Not Valid for Automobiles, valid 24/7) Pre-tax Payroll Deduction of $10.17 per paycheck *Motorcycle permits must be displayed and locked to the motorcycle in the holder provided. Copies by hanging forward on the rearview mirror or upright on driver side dashboard. Motorcycle permits must

Dunham, Maitreya

139

EMPLOYEES U-PASS & Parking Permits Shaded area to be completed by Cashier Office  

E-Print Network [OSTI]

Deduction of $26.67 per paycheck Mon Tues Wed Thurs Fri Sat Sun Quarterly Motorcycle Parking Permit of $10.17 per paycheck *Motorcycle permits must be displayed and locked to the motorcycle in the holder visible either by hanging forward on the rearview mirror or upright on driver side dashboard. Motorcycle

Yetisgen-Yildiz, Meliha

140

Hydrothermal alteration in research drill hole Y-2, Lower Geyser Basin, Yellowstone National Park, Wyoming  

SciTech Connect (OSTI)

Y-2, a US Geological Survey research diamond-drill hole in Lower Geyser Basin, Yellowstone National Park, was drilled to a depth of 157.4 meters. The hole penetrated interbedded siliceous sinter and travertine to 10.2 m, glacial sediments of the Pinedale Glaciation interlayered with pumiceous tuff from 10.2 to 31.7 m, and rhyolitic lavas of the Elephant Back flow of the Central Plateau Member and the Mallard Lake Member of the Pleistocene Plateau Rhyolite from 31.7 to 157.4 m. Hydrothermal alteration is pervasive in most of the nearly continuous drill core. Rhyolitic glass has been extensively altered to clay and zeolite minerals (intermediate heulandite, clinoptilolite, mordenite, montmorillonite, mixed-layer illite-montmorillonite, and illite) in addition to quartz and adularia. Numerous veins, vugs, and fractures in the core contain these and other minerals: silica minerals (opal, ..beta..-cristobalite, ..cap alpha..-cristobalite, and chalcedony), zeolites (analcime, wairakite, dachiardite, laumontite, and yugawaralite), carbonates (calcite and siderite), clay (kaolinite and chlorite), oxides (hematite, goethite, manganite, cryptomelane, pyrolusite, and groutite), and sulfides (pyrhotite and pyrite) along with minor aegirine, fluorite, truscottite, and portlandite. Interbedded travertine and siliceous sinter in the upper part of the drill core indicate that two distinct types of thermal water are responsible for precipitation of the surficial deposits, and further that the water regime has alternated between the two thermal waters more than once since the end of the Pinedale Glaciation (approx. 10,000 years B.P.). Alternation of zones of calcium-rich and sodium- and potassium-rich hydrothermal minerals also suggests that the calcium-rich and sodium- and potassium-rich hydrothermal minerals also suggests that the water chemistry in this drill hole varies with depth.

Bargar, K.E.; Beeson, M.H.

1981-05-01T23:59:59.000Z

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


141

Valuing the Invaluable: An Investigation of Outdoor Recreation Behavior, Perceived Values of Ecosystem Services, and Biophysical Conditions on Channel Islands National Park  

E-Print Network [OSTI]

Impacts on parks and protected areas are modifying ecosystems that provide benefits to sustain human health and well-being. Compelling evidence of ecological and economic values has been gathered to better understand the implications...

van Riper, Carena J

2014-05-06T23:59:59.000Z

142

Ecological risk assessment of elemental pollution in sediment from Tunku Abdul Rahman National Park, Sabah  

SciTech Connect (OSTI)

Eleven (11) surface sediment samples were collected from Tunku Abdul Rahman National Park, Sabah. The neutron activation analysis (NAA) and inductively coupled plasma-mass spectrometry (ICP-MS) techniques were applied for the determinations metal contents and their distributions in sediment samples. The results shown that Arsenic (As) concentrations are enriched at all sampling stations except for station TAR 09, with enrichment factor (EF) values ranged from 1.1 to 7.2. The elements such as Cd, Cr, Sb and U showed enrichment at a few stations and other elements (Cr, Cu, Pb, Th, Zn) shown as background levels in all stations. Degrees of contamination in this study were calculated base on concentrations of six elements (As, Cd, Cr, Cu, Pb, and Zn). TAR 11 station can be categorized as very high degree of contamination with degree of contamination value of 43.2. TAR 07 station can be categorized as a considerable degree of contamination (contamination value of 16.9). Six stations (TAR 01, 03, 04, 05, 06, 08, 10) showed moderate degree of contamination, with contamination values ranging from 8.0 to 16.0. TAR 02 and TAR 09 stations showed low degree of contaminations (< 8.0). TAR 11 showed very high ecological risk index (R{sub I}) with RI value is 916. TAR 07 and TAR 10 showed moderate ecological risk index with R{sub I} value 263 and 213, respectively. Other stations showed low ecological risk with RI values ranging from 42.3 to 117 (< 150). Very high ecological risk index could give an adverse effect to the benthic organism. The data obtained from the enrichment factor, degree of contamination and ecological risk index provided vital information, which can be used for future comparison. Information from the present study will be useful to the relevant government agencies and authorities in preparing preventive action to control direct discharge of heavy metals from industries, agro-base activities and domestic waste to the rivers and the sea.

Elias, Md Suhaimi; Hamzah, Mohd Suhaimi; Rahman, Shamsiah Ab; Salim, Nazaratul Ashifa Abdullah; Siong, Wee Boon; Sanuri, Ezwiza [Analytical Chemistry Application Group, Waste and Environmental Technology Division, Malaysian Nuclear Agency, Bangi 43000, Kajang, Selangor (Malaysia)

2014-02-12T23:59:59.000Z

143

LED Provides Effective and Efficient Parking Area Lighting at the NAVFAC Engineering Service Center  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeatMulti-Dimensionalthe10 DOEWashington, DCKickoffLDV HVAC ModelLEDLightsLED parking

144

A case study of the implementation of a parking fee at R. A. Apffel Park in Galveston, Texas  

E-Print Network [OSTI]

and Atmospheric Administration 1978). Through this effort, Cape Hatteras National Seashore was established. In 1955 the National Park Service (NPS ) issued a report entitled, A Re ort on a Seashore Recreation Area Surve ~ This report inventoried the amount...A CASF. STUDY OF THE IMFLEMENTAT ION OF A PARKING FEE AT R. A. APFFEL FARY. IN GALVESTON, TEXAS A Thesis by SHERYL DRUGGAN ALBERS Su'bmitted to the Graduate College of Texas A&M University in partial fulfillment of the reouirement...

Albers, Sheryl Druggan

1982-01-01T23:59:59.000Z

145

E-Print Network 3.0 - acadia national park Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Information Service, ... Source: National Oceanic and Atmospheric Administration (NOAA), Fishery Bulletin Collection: Environmental Sciences and Ecology 87 Fire and biofuel...

146

Options for National Parks and Reserves for Adapting to Climate Change  

E-Print Network [OSTI]

the transition to ecosystem-based management of the Greattransition toward sustainability. National Academy Press, Washington, DC Environmental Management (

2009-01-01T23:59:59.000Z

147

A study of historical vegetation in Lyndon B. Johnson National Historical Park  

E-Print Network [OSTI]

that established LYJO (Public Law 91-134, December 2, 1969, and amended by Public Law 96- 607, December 28, 1980), as well as NPS commitments to Johnson himself, r equire that the landscape of the park be carefully managed as a major component of the historic... exist but may be difficult to find. As landscape changes are made, outdated drawings may seem to lose their value and not be carefully filed or stor ed. For example, Zellie ( 1982) sear ching 16 for old landscape plans in Massachusetts found them...

Gardner, Gwendolyn Ann

1986-01-01T23:59:59.000Z

148

Protected Areas Stacy Philpott  

E-Print Network [OSTI]

· Convention of Biological Diversity, 1992 #12;IUCN Protected Area Management Categories Ia. Strict Nature. Protected Landscape/ Seascape VI. Managed Resource Protected Area #12;Ia. Strict Nature Preserves and Ib. Wilderness Areas · Natural preservation · Research · No · No #12;II. National Parks · Ecosystem protection

Gottgens, Hans

149

Discover the beauty of Taiwan...... 2-day Trip to National Scenic Area of Huadong Eastern Coast & Rift Valley  

E-Print Network [OSTI]

of Taidong begins with the journey... Day 1 07:00~ Departure from National Army Guest House/Chung Cheng hotel .... 15:30~17:30 Guanshan Water Ecological Park & Bikeway Guanshan Water Park is mainly divided into three. It is a place integrated with environment and ecological education, bringing water close to the visitors

Wong, Ngai-Ching

150

Monitoring of Olympic National Park Beaches to determine fate and effects of spilled bunker C fuel oil  

SciTech Connect (OSTI)

On December 23, 1988, the barge Nestucca was accidentally struck by its tow, a Souse Brothers Towing Company tug, releasing approximately 230,000 gallons of Bunker C fuel oil and fouling beaches from Grays Harbor north to Vancouver Island. Affected beaches in Washington included a 40-mile-long strip that has been recently added to Olympic National Park. The purpose of the monitoring program documented in this report was to determine the fate of spilled Bunker C fuel oil on selected Washington coastal beaches. We sought to determine (1) how much oil remained in intertidal and shallow subtidal habitats following clean-up and weathering, (2) to what extent intertidal and/or shallow subtidal biotic assemblages have been contaminated, and (3) how rapidly the oil has left the ecosystem. 45 refs., 18 figs., 8 tabs.

Strand, J.A.; Cullinan, V.I.; Crecelius, E.A.; Fortman, T.J.; Citterman, R.J.; Fleischmann, M.L.

1990-10-01T23:59:59.000Z

151

area idaho national: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Operated by Los Alamos National Security, LLC for the U.S. Department of Energy's NNSA Division -Los Alamos National Laboratory 2. Chemistry Division -Los Alamos National...

152

Case Study: Mobile Photovoltaic System at Bechler Meadows Ranger Station, Yellowstone National Park (Brochure)  

SciTech Connect (OSTI)

The mobile PV/generator hybrid system deployed at Bechler Meadows provides a number of advantages. It reduces on-site air emissions from the generator. Batteries allow the generator to operate only at its rated power, reducing run-time and fuel consumption. Energy provided by the solar array reduces fuel consumption and run-time of the generator. The generator is off for most hours providing peace and quiet at the site. Maintenance trips from Mammoth Hot Springs to the remote site are reduced. The frequency of intrusive fuel deliveries to the pristine site is reduced. And the system gives rangers a chance to interpret Green Park values to the visiting public. As an added bonus, the system provides all these benefits at a lower cost than the basecase of using only a propane-fueled generator, reducing life cycle cost by about 26%.

Not Available

2014-03-01T23:59:59.000Z

153

Linking Institutional Characteristics to Communal Natural Resource Conservation in Cumbres de Monterrey National Park  

E-Print Network [OSTI]

by the Springfield Research Award was instrumental in completing this research, for which I am very grateful. ix NOMENCLATURE SEMERNAT Secretary of the Environment and Natural Resources Secretaría de Medio Ambiente y Recursos Naturales PROCEDE National...

Clifton, Kathryn Marie

2014-05-08T23:59:59.000Z

154

Marketing the Mountains: An Environmental History of Tourism in Rocky Mountain National Park  

E-Print Network [OSTI]

the landscape as trains, later automobiles, and finally airplanes brought more people to and through the region.2 Pomeroy offers valuable insight into the complex processes through which the ?toured upon? assume roles that reflect the sort of authentic... Farrar Hyde?s An American Vision: Far Western Landscape and National Culture, 1820-1920 also marks an important contribution to the understanding the connections between national identity, the American West, and tourism. Of central concern to Hyde...

Frank, Jerritt

2008-09-05T23:59:59.000Z

155

National Park Service - Yellowstone National Park, Wyoming |...  

Energy Savers [EERE]

isolated from the commercial power grid, and power has been traditionally supplied by propane generators. The generators are now only a backup system for a 7kW photovoltaic (PV)...

156

BIOTROPICA 37(4): 631640 2005 10.1111/j.1744-7429.2005.00080.x Factors Influencing Tree Phenology in Tai National Park, C^ote d'Ivoire1  

E-Print Network [OSTI]

in Ta¨i National Park, C^ote d'Ivoire1 Dean P. Anderson2,6, Erik. V. Nordheim3, Timothy C. Moermond2 leaf phenology for 797 trees from 38 species in the Ta¨i National Park, C^ote d'Ivoire. We determined nouvelles feuilles pour 797 arbres de 38 esp`eces dans le Parc National de Ta¨i, C^ote d'Ivoire. Nous avons

157

Reaching an agreement to build a new coal-fired power plant near a national park by mitigating potential environmental impacts  

SciTech Connect (OSTI)

This paper presents an interesting example of compromise through comprehensive environmental analysis and intensive negotiation to build a coal-fired power plant near an environmentally sensitive area. In December 1993, the US Department of Energy (DOE) completed the final environmental impact statement (EIS) for the Healy Clean Coal Project (HCCP), a proposed demonstration project that would be cost-shared by DOE and the Alaska Industrial Development and Export Authority (AIDEA). The HCCP would be built adjacent to the existing coal-fired Golden Valley Electric Association, Inc. (GVEA) Unit No. 1 in Healy, Alaska, about 4 miles north of Denali National Park and Preserve (DNPP). In response to US Department of the Interior (DOI) concerns about potential air quality related impacts on DNPP, DOE facilitated negotiations among DOI, AIDEA, and GVEA which overcame a ``stalemate`` situation. A Memorandum of Agreement was signed by all four parties, enabling DOI to withdraw its objections. The cornerstone of the Agreement is the planned retrofit of Unit No. 1 to reduce emissions of sulfur dioxide and oxides of nitrogen. if the demonstration technologies operate as expected, combined emissions from the Healy site would increase by only about 8% but electrical generation would triple. The Agreement is a ``win/win`` outcome: DOE can demonstrate the new technologies, AIDEA can build a new power plant for GVEA to operate, and DOI can safeguard the pristine environment of DNPP.

Miller, R.L. [Oak Ridge National Lab., TN (United States); Ruppel, T.C.; Evans, E.W.; Heintz, S.J. [USDOE Pittsburgh Energy Technology Center, PA (United States)

1994-12-31T23:59:59.000Z

158

Isotopic Analysis At Lassen Volcanic National Park Area (Janik & Mclaren,  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia: Energy Resources Jump to:46 - 429 Throttled (botOpen Energy Information 2006) JumpInformationOpen

159

Static Temperature Survey At Lassen Volcanic National Park Area (Janik &  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd JumpGTZHolland,0162112°,St.StanlyEnergy InformationEpp, 1983) |2005)

160

Surface Gas Sampling At Lassen Volcanic National Park Area (Janik &  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen, Minnesota:36052°,Sunfield,FarmsSupport Resources, Inc1983)

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


161

Teleseismic-Seismic Monitoring At Lassen Volcanic National Park Area (Janik  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty LtdSteen,Ltd Jump to:Taos County,Tees Valley

162

EA-1975: LINAC Coherent Light Source-Il, SLAC National Accelerator Laboratory, Menlo Park, California  

Broader source: Energy.gov [DOE]

DOE prepared an EA on the potential environmental impacts of a proposal to upgrade the existing LINAC Coherent Light Source (LCLS) at the SLAC National Accelerator Laboratory. The proposed LCLS-II would extend the photon energy range, increase control over photon pulses, and enable two-color pump-probe experiments. The X-ray laser beams generated by LCLS-II would enable a new class of experiments: the simultaneous investigation of a material’s electronic and structural properties.

163

AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Sleeping Bear Dunes National Lakeshore  

SciTech Connect (OSTI)

This report focuses on the Sleeping Bear Dunes National Lakeshore (SLBE) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements.

Stephen Schey; Jim Francfort

2014-11-01T23:59:59.000Z

164

Semi-Continuous Measurements of Aerosol Chemical Composition During the Summer 2002 Yosemite National Park Special Study  

SciTech Connect (OSTI)

Semi-continuous measurements of fine particle composition were made over a period of several weeks in summer 2002 in Yosemite National Park, California. These included measurement of aerosol ionic composition (by PILS- Particle-Into-Liquid System) and aerosol carbon (by dual wavelength aethalometer and an R&P particulate carbon monitor). The data reveal that aerosol composition at the site is highly :variable in time, with a strong diurnal cycle. Interestingly, however, different diurnal cycles were sometimes observed for different chemical constituents of the particles. Organic carbon was observed to dominate fine particle mass, with some periods apparently associated with influx of smoke from wildfires in the western U.S. Measurements of fine particle carbon isotopes revealed the fraction of carbon from biogenic sources to range from approximately 73 to 95%. The ionic fraction of the aerosol was usually dominated by ammoniated sulfate. During most periods, PM{sub 2.5} nitrate was found primarily in sea salt particles from which chloride had been displaced. Strong variations in the extent of ammonia neutralization of sulfate were also observed. The ability to observe rapid changes in aerosol composition using these semi-continuous aerosol composition measurements is helpful for understanding the dynamic chemical composition of fine particles responsible for regional haze.

Collette, J; Lee, T; Heath, J; Carrico, C; Herckes, P; Engling, G; McMeeking, G; Kreidenweis, S; Day, D; Malm, W; Cahill, T

2003-02-16T23:59:59.000Z

165

Determining the best source of renewable electricity to power a remote site for the National Park Service  

SciTech Connect (OSTI)

Renewable energy technologies have economic and environmental advantages in many remote applications. They can provide most of the power to off-grid loads, where batteries and another power source such as a generator or a fuel cell may be required to ensure availability and feasibility. In support of the National Park Service, the Federal Energy Management Program Team at the National Renewable Energy Laboratory has evaluated several methods for providing a renewable source of electricity to a beach campsite at Kirby Cove, Marin County, California. This site requires 2 kWh per day to power a campground host in a motor home five months power year. The existing electricity line to the site is in need of replacement and the NPS is interested in evaluating more cost-effective and environmentally sensitive alternatives. Photovoltaics, tidal current, and wind power systems in combination with a back-up electric system (standard, thermoelectric, and Stirling generator and fuel cell) and an energy storage medium (battery, flywheel, and hydrogen) were analyzed. Multi-objective optimization criteria include initial cost, operating cost, emissions, maintenance requirements, and to be consistent with the NPS requirements, the system must be clean, silent, and sustainable. The best system combination was designed according to these evaluation criteria and a demonstration system is to be constructed. This paper describes the optimization procedure and design. Results indicate that a 800 Watt photovoltaic array with a hydrogen fuel cell best serves the requirements for clean, silent power. Since fuel cells are developmental, a propane generator is recommended as an alternative.

Azerbegl, R.; Mas, C.; Walker, A.; Morris, R.; Christensen, J.

1999-07-01T23:59:59.000Z

166

On the Border in Everglades and Dry Tortugas: Identifying Federal Law Enforcement Perspectives on Response to Cuban Immigrant Landings in South Florida's National Parks  

E-Print Network [OSTI]

of national park studies includes literature on law enforcement and encroaching urban activities such as gang violence and break-ins, as well as increasing international activities such as drug smuggling, human smuggling and trafficking, legal and illegal....) people moved by migrant smugglers or human trafficking, 4.) people who deliberately abuse the asylum system. Human smugglers are paid to help migrants gain illegal entry into a country while human traffickers take control over the persons...

Bentley, Amanda

2012-10-19T23:59:59.000Z

167

http://www.caymannetnews.com/cgi-script/csArticles/articles/000107/010744.htm Barkers National Park or Dump?  

E-Print Network [OSTI]

by mega-ships which loomed over the island like mythical monoliths. Then up West Bay Road and past . . . the very thing that is the focus of the Brac's eco-tourism marketing program. Put in proper park gates. How

Exeter, University of

168

Kentucky Clinic Parking Parking Garage  

E-Print Network [OSTI]

BUS Kentucky Clinic Parking E Permit Parking Garage E Permit Parking Lot Reserved Parking Markey/2011 College of Pharmacy LEADERAVE. RoadClosed College of Medicine Building Kentucky Clinic GAZETTEAVE. TRANSCRIPTAVE. BBSRB University of Kentucky College of Medicine 138 Leader Avenue Lexington, KY 40506

Hayes, Jane E.

169

Landscaping and Parking Renovations  

Broader source: Energy.gov [DOE]

Renovations to Federal facility landscaping and parking areas can provide opportunities for several renewable energy options, including geothermal heat pumps (GHP), solar water heating, photovoltaics (PV), and energy efficiency technologies.

170

area argonne national: Topics by E-print Network  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

under appointment to the Applied Health Physics Fellowship program administered by Oak Ridge... Tharakan, Binesh Korah 1997-01-01 28 Argonne National Laboratory is a U.S....

171

Car Parking Permit Eligibility 1. Eligible Groups  

E-Print Network [OSTI]

the Site Security Staff on arrival and allow parking in loading areas when longer than one hour is required

Martin, Ralph R.

172

South Parking Garage SAN SALVADOR STREET  

E-Print Network [OSTI]

FOB YUH SPXC SPXE West Parking Garage DH South Parking Garage UPD MQH SH SAN SALVADOR STREET SAN Salvador Street · Once you enter, if you are Disabled, proceed to park in the Disabled parking area Salvador St. · Proceed to the West Garage (4th St.) entrance on right hand side · Once you enter, if you

Su, Xiao

173

Campus Parking Map University of California  

E-Print Network [OSTI]

Campus Parking Map University of California BERKELEY #12;Campus Building Locations Parking Lots/Garages Building Name Grid Building Name(Continued) Grid Building Name(Continued) Grid Grid Parking Information parking spaces are located throughout the campus; areas are indicated on the map on reverse. Bicycles

Lee, Seung-Wuk

174

Sustainability of Ganesha Park Pomona, California  

E-Print Network [OSTI]

1 Sustainability of Ganesha Park Pomona, California Professor Terry Young Parks and Protected Areas will begin to explore the relationship between sustainability and Ganesha Park in Pomona, California as well such as solar power systems and rain water reuse for irrigation purposes. In addition, sustainable parks employ

Young, Terence

175

Aerial survey of Bay Area continues through Saturday | National...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

California's Bay Area. The helicopter crew has been taking measurements of naturally-occurring background radiation. The survey is expected to be completed on Saturday, Sept. 1....

176

TEMPORAL AND SPATIAL VARIATION OF ATMOSPHERICALLY DEPOSITED ORGANIC CONTAMINANTS AT HIGH ELEVATION IN YOSEMITE NATIONAL PARK, CALIFORNIA, USA  

E-Print Network [OSTI]

be transported tens of kilometers and deposited in adjacent mountains in many parts of the world. Atmospherically guidelines or critical thresholds in both parks. A general pattern of difference between Yosemite and Sequoia to organophosphorus and carbamate pesticides. Variability of chemical concentrations among sites, between sampling

Knapp, Roland

177

The investment made in serving at-risk children and youth by a national sample of recreation and park agencies  

E-Print Network [OSTI]

. The objectives of this thesis were to: (1) identify the definitions of at-risk children and youth that are most prevalent in the recreation and parks field; (2) establish baseline data which reports the efforts being made by agencies to serve at-risk children...

Espericueta, Lorina

1995-01-01T23:59:59.000Z

178

Area Lodging: Oak Ridge | Y-12 National Security Complex  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone by E-mailRadioimmunotherapyArchiveAre EarthsOak Ridge Area

179

The Ecological Society of America www.frontiersinecology.org For most large US park and wilderness areas, legislation  

E-Print Network [OSTI]

ensure long- term conservation of biodiversity and ecosystems within protected-area boundaries. Recently goal for many protected areas; this includes the preservation of genetic diversity, species, biotic areas. Growing awareness of extensive Native American influences on "natural" landscapes and an under

Yung, Laurie

180

Relation of park types and visitors' expenditure patterns: an analysis  

E-Print Network [OSTI]

and Alderdice, 1979) . Increased awareness of national parks has developed two contrasting views (Nelson, 1973, as cited by Smith and Alderdice, 1979). According to the first view preservation of natural and historical features should be the main mandate... and texts will be discussed in the framework of this study. 15 Park Classification In 1951, Charles Sauers prepared a paper "The Order of Parks" at the National Conference on State Parks. In this paper he noted that in defining park types...

Currie, Russell Roger

1992-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


181

Urban Parks: Constraints on Park Visitation  

E-Print Network [OSTI]

in a Recreation research shows that there are marked inequalities among population groups in terms of their participation in different leisure activities and their use of local, regional and national park and recre- ation services. Those who do... studies focused primarily on factors that are physical and external to the individual, such as disabilities or lack of facilities. But there are also intrapersonal constraints, which have to do with people?s personality needs, prior socialization...

Scott, David

2006-12-19T23:59:59.000Z

182

Southeast Idaho Area Links  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Attractions and Events Area Geography Area History Area Links Driving Directions Idaho Falls Attractions and Events INL History INL Today Research Park Sagebrush Steppe...

183

E-Print Network 3.0 - areas sierra sur Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

R. MATTHEWS... water bodies in a 100,000-ha area in the John Muir Wilderness (JMW) and Kings Canyon National Park (KCNP... Sierra Nevada. At the landscape scale (JMW compared to...

184

Applications of solar energy in industrial parks  

SciTech Connect (OSTI)

The four phases of ongoing work at SERI that examines many unresolved questions regarding the purpose, solar applicability, economics, and energy modeling of industral parks are presented. The first phase involved site visits to approximately 300 parks in 12 major metropolitan areas of 9 states. Phase 2 entails an analysis of four parks selected from those parks surveyed. Phase 3 narrows the focus to two parks to be examined for detailed technical and engineering analysis. Phase 4 incorporates all of the work of the earlier phases with economic criteria to produce an energy allocation model describing energy delivery and consumption within the park.

Greaver, V.W.; Farrington, R.B.; Leboeuf, C.M.

1980-05-01T23:59:59.000Z

185

Nevada National Security Site 2012 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Site  

SciTech Connect (OSTI)

Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2012 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2012; 2013a; 2013b). Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are only slightly above detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. The 133.9 millimeters (mm) (5.27 inches [in.]) of precipitation at the Area 3 RWMS during 2012 is 12% below the average of 153.0 mm (6.02 in.), and the 137.6 mm (5.42 in.) of precipitation at the Area 5 RWMS during 2012 is 11% below the average of 122.4 mm (4.82 in.). Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Automated vadose zone monitoring on Area 5 and Area 3 RWMS cell covers show no evidence of precipitation percolating through the cover to the waste. Moisture from precipitation did not percolate below 60 centimeters (cm) (2 feet [ft]) in the vegetated final cover on the U-3ax/bl disposal unit at the Area 3 RWMS, and moisture from precipitation and irrigation did not percolate below 45 cm (1.5 ft) on the 92-Acre Area final cover. Irrigation was applied to this cover for seed germination and plant growth. During 2012, there was no drainage through 2.4 meters (8 ft) of soil from the Area 3 drainage lysimeters that received only natural precipitation. Twenty percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter that received 3 times natural precipitation. All 2012 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

Hudson, David B.

2013-09-10T23:59:59.000Z

186

Nevada National Security Site 2013 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Site  

SciTech Connect (OSTI)

Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) within the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2013 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2013; 2014a; 2014b). Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are close to detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below Derived Concentration Standards for these radionuclides. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. Leachate samples collected from the leachate collection system at the mixed low-level waste cell were below established contaminant regulatory limits. The 105.8 millimeters (mm) (4.17 inches [in.]) of precipitation at the Area 3 RWMS during 2013 is 30% below the average of 150.3 mm (5.92 in.), and the 117.5 mm (4.63 in.) of precipitation at the Area 5 RWMS during 2013 is 5% below the average of 123.6 mm (4.86 in.). Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Automated vadose zone monitoring on Area 5 and Area 3 RWMS cell covers show no evidence of precipitation percolating through the cover to the waste. Moisture from precipitation did not percolate below 60 centimeters (cm) (2 feet [ft]) in the vegetated final cover on the U-3ax/bl disposal unit at the Area 3 RWMS, and moisture from precipitation and irrigation did not percolate below 45 cm (1.5 ft) on the 92-Acre Area final cover. Irrigation was applied to this cover for seed germination and plant growth. During 2013, there was no drainage through 2.4 meters (8 ft) of soil from the Area 3 drainage lysimeters that received only natural precipitation. Twenty percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter that received 3-times natural precipitation. All 2013 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

Hudson, D. B.

2014-08-19T23:59:59.000Z

187

Nevada National Security Site 2010 Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites  

SciTech Connect (OSTI)

Environmental monitoring data were collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, vadose zone, subsidence, and biota. This report summarizes the 2010 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports (National Security Technologies, LLC, 2010a; 2010b; 2011). Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Air monitoring data at the Area 3 and Area 5 RWMSs indicate that tritium concentrations are slightly above background levels. All gamma spectroscopy results for air particulates collected at the Area 3 and Area 5 RWMS were below the minimum detectable concentrations, and concentrations of americium and plutonium are only slightly above detection limits. The measured levels of radionuclides in air particulates and moisture are below derived concentration guides for these radionuclides. Groundwater monitoring data indicate that the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by facility operations. The 246.9 millimeters (mm) (9.72 inches [in.]) of precipitation at the Area 3 RWMS during 2010 is 56 percent above the average of 158.7 mm (6.25 in.), and the 190.4 mm (7.50 in.) of precipitation at the Area 5 RWMS during 2010 is 50 percent above the average of 126.7 mm (4.99 in.). Soil-gas tritium monitoring at borehole GCD-05 continues to show slow subsurface migration consistent with previous results. Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Data from the automated vadose zone monitoring system for the operational waste pit covers show that moisture from precipitation did not percolate below 90 centimeters (cm) (3 feet [ft]) before being removed by evaporation. Moisture from precipitation did not percolate below 61 cm (2 ft) in the vegetated final mono-layer cover on the U-3ax/bl disposal unit at the Area 3 RWMS before being removed by evapotranspiration. During 2010, there was no drainage through 2.4 meters (8 ft) of soil from the Area 3 drainage lysimeters that received only natural precipitation. Water drained from both the bare-soil drainage lysimeter and the invader species drainage lysimeter that received 3 times natural precipitation. All 2010 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

NSTec Environmental Management

2011-06-01T23:59:59.000Z

188

Annual Report for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility - Fiscal Year 2011  

SciTech Connect (OSTI)

As a condition to the Disposal Authorization Statement issued to Los Alamos National Laboratory (LANL or the Laboratory) on March 17, 2010, a comprehensive performance assessment and composite analysis maintenance program must be implemented for the Technical Area 54, Area G disposal facility. Annual determinations of the adequacy of the performance assessment and composite analysis are to be conducted under the maintenance program to ensure that the conclusions reached by those analyses continue to be valid. This report summarizes the results of the fiscal year 2011 annual review for Area G. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 and formally approved in 2009. These analyses are expected to provide reasonable estimates of the long-term performance of Area G and, hence, the disposal facility's ability to comply with Department of Energy (DOE) performance objectives. Annual disposal receipt reviews indicate that smaller volumes of waste will require disposal in the pits and shafts at Area G relative to what was projected for the performance assessment and composite analysis. The future inventories are projected to decrease modestly for the pits but increase substantially for the shafts due to an increase in the amount of tritium that is projected to require disposal. Overall, however, changes in the projected future inventories of waste are not expected to compromise the ability of Area G to satisfy DOE performance objectives. The Area G composite analysis addresses potential impacts from all waste disposed of at the facility, as well as other sources of radioactive material that may interact with releases from Area G. The level of knowledge about the other sources included in the composite analysis has not changed sufficiently to call into question the validity of that analysis. Ongoing environmental surveillance activities are conducted at, and in the vicinity of, Area G. However, the information generated by many of these activities cannot be used to evaluate the validity of the performance assessment and composite analysis models because the monitoring data collected are specific to operational releases or address receptors that are outside the domain of the performance assessment and composite analysis. In general, applicable monitoring data are supportive of some aspects of the performance assessment and composite analysis. Several research and development (R and D) efforts have been initiated under the performance assessment and composite analysis maintenance program. These investigations are designed to improve the current understanding of the disposal facility and site, thereby reducing the uncertainty associated with the projections of the long-term performance of Area G. The status and results of R and D activities that were undertaken in fiscal year 2011 are discussed in this report. Special analyses have been conducted to determine the feasibility of disposing of specific waste streams, to address proposed changes in disposal operations, and to consider the impacts of changes to the models used to conduct the performance assessment and composite analysis. These analyses are described and the results of the evaluations are summarized in this report. The Area G disposal facility consists of Material Disposal Area (MDA) G and the Zone 4 expansion area. To date, all disposal operations at Area G have been confined to MDA G. Material Disposal Area G is scheduled to undergo final closure in 2015; disposal of waste in the pits and shafts is scheduled to end in 2013. In anticipation of the closure of MDA G, plans are being made to ship the majority of the waste generated at LANL to off-site locations for disposal. It is not clear at this time if waste that will be disposed of at LANL will be placed in Zone 4 or if disposal operations will move to a new location at the Laboratory. Separately, efforts to optimize the final cover used in the closure of MDA G are underway; a final cover design different than that adopted for the performance assessment and composite analy

French, Sean B. [Los Alamos National Laboratory; Shuman, Rob [WPS: WASTE PROJECTS AND SERVICES

2012-05-22T23:59:59.000Z

189

INDEPENDENT VERIFICATION SURVEY OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT OUTSIDE AREAS BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK  

SciTech Connect (OSTI)

5098-SR-03-0 FINAL REPORT- INDEPENDENT VERIFICATION SURVEY OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT OUTSIDE AREAS, BROOKHAVEN NATIONAL LABORATORY

P.C. Weaver

2010-12-15T23:59:59.000Z

190

Idaho National Laboratory History  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Attractions and Events Area Geography Area History Area Links Driving Directions Idaho Falls Attractions and Events INL History INL Today Research Park Sagebrush Steppe...

191

Idaho National Laboratory Today  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Attractions and Events Area Geography Area History Area Links Driving Directions Idaho Falls Attractions and Events INL History INL Today Research Park Sagebrush Steppe...

192

Nevada National Security Site 2011 Waste Management Monitoring Report, Area 3 and Area 5 Radioactive Waste Management Site  

SciTech Connect (OSTI)

Environmental monitoring data are collected at and around the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). These data are associated with radiation exposure, air, groundwater, meteorology, and vadose zone. This report summarizes the 2011 environmental data to provide an overall evaluation of RWMS performance and to support environmental compliance and performance assessment (PA) activities. Some of these data (e.g., radiation exposure, air, and groundwater) are presented in other reports. Direct radiation monitoring data indicate exposure levels at the RWMSs are within the range of background levels measured at the NNSS. Slightly elevated exposure levels outside the Area 3 RWMS are attributed to nearby historical aboveground nuclear weapons tests. Air monitoring data show tritium concentrations in water vapor and americium and plutonium concentrations in air particles are only slightly above detection limits and background levels. The measured levels of radionuclides in air particulates and moisture are below derived concentration guides for these radionuclides. During the last 2 weeks of March 2011, gamma spectroscopy results for air particles showed measurable activities of iodine-131 (131I), cesium-134 (134Cs), and cesium-137 (137Cs). These results are attributed to the release of fission products from the damaged Fukushima Daiichi power plant in Japan. The remaining gamma spectroscopy results for air particulates collected at the Area 3 and Area 5 RWMS were below minimum detectable concentrations. Groundwater monitoring data indicate the groundwater in the uppermost aquifer beneath the Area 5 RWMS is not impacted by RWMS operations. Results of groundwater analysis from wells around the Area 5 RWMS were all below established investigation levels. The 86.3 millimeters (mm) (3.40 inches [in.]) of precipitation at the Area 3 RWMS during 2011 is 44% below the average of 154.1 mm (6.07 in.), and the 64.8 mm (2.55 in.) of precipitation at the Area 5 RWMS during 2011 is 47% below the average of 122.4 mm (4.82 in.). Water balance measurements indicate that evapotranspiration from the vegetated weighing lysimeter dries the soil and prevents downward percolation of precipitation more effectively than evaporation from the bare-soil weighing lysimeter. Automated vadose zone monitoring on Area 5 RWMS operational waste covers was not done during 2011 due to construction of the final evapotranspiration cover at these monitoring locations. Moisture from precipitation did not percolate below 122 centimeters (4 feet) in the vegetated final mono-layer cover on the U-3ax/bl disposal unit at the Area 3 RWMS before being removed by evapotranspiration. During 2011, there was no drainage through 2.4 meters (8 feet) of soil from the Area 3 drainage lysimeters that received only natural precipitation. Ten percent of the applied precipitation and irrigation drained from the bare-soil drainage lysimeter that received 3 times natural precipitation. All 2011 monitoring data indicate that the Area 3 and Area 5 RWMSs are performing within expectations of the model and parameter assumptions for the facility PAs.

NSTec Environmental Management

2012-07-31T23:59:59.000Z

193

Your preferences for Parks, Open Spaces and Recreation Facilities  

E-Print Network [OSTI]

.Footballfields h. Indoor ice skating rinks i. Indoor hockey rinks j. Golf courses k. Park picnic areas l

Brown, Gregory G.

194

Geomorphology and morphometric characteristics of alluvial fans, Guadalupe Mountains National Park and adjacent areas, west Texas and New Mexico  

E-Print Network [OSTI]

............................................................ 29 14 Alluvial fans along the Guadalupe Mountains in Big Dog Canyon........ 31 15 Alluvial fans along the Brokeoff Mountains in Big Dog Canyon........... 35 16 View of alluvial fans from their drainage basins.................................. 75 27 Salt Basin-Brokeoff Mountains alluvial fan group ................................. 76 28 Big Dog Canyon-Brokeoff Mountains alluvial fan group....................... 77 29 Big Dog Canyon-Guadalupe Mountains alluvial fan group...

Given, Jeffrey Lyle

2004-09-30T23:59:59.000Z

195

Reviving upside-down architecture : using a historically transitional form of parking to reduce the impact of cars in mixed-use commercial areas  

E-Print Network [OSTI]

In the quest to reduce American automobile usage, critics have pointed to abundant and free parking as the root of a self-reinforcing pattern of scattered development that has led to a narcotic-like automobile dependency. ...

Groll, Stephanie (Stephanie Olinda)

2006-01-01T23:59:59.000Z

196

Area Monitoring Dosimeter Program for the Pacific Northwest National Laboratory: Results for CY 2005  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory (PNNL) established an area monitoring dosimeter program in accordance with Article 514 of the Department of Energy (DOE) Radiological Control Manual (RCM) in January 1993. This program is to minimize the number of areas requiring issuance of personnel dosimeters and to demonstrate that doses outside Radiological Buffer Areas are negligible. In accordance with 10 CFR Part 835.402 (a)(1)-(4) and Article 511.1 of the PNNL Radiological Control Program Description, personnel dosimetry shall be provided to (1) radiological workers who are likely to receive at least 100 mrem annually, and (2) declared pregnant workers, minors, and members of the public who are likely to receive at least 50 mrem annually. Program results for calendar years 1993-2005 confirm that personnel dosimetry is not needed for individuals located in areas monitored by the program

Bivins, Steven R.; Stoetzel, Gregory A.

2006-06-21T23:59:59.000Z

197

Area Monitoring Dosimeter Program for the Pacific Northwest National Laboratory: Results for CY 2006  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory (PNNL) established an area monitoring dosimeter program in accordance with Article 514 of the Department of Energy (DOE) Radiological Control Manual (RCM) in January 1993. This program is to minimize the number of areas requiring issuance of personnel dosimeters and to demonstrate that doses outside Radiological Buffer Areas are negligible. In accordance with 10 CFR Part 835.402 (a)(1)-(4) and Article 511.1 of the PNNL Radiological Control Program Description, personnel dosimetry shall be provided to 1) radiological workers who are likely to receive at least 100 mrem annually, and 2) declared pregnant workers, minors, and members of the public who are likely to receive at least 50 mrem annually. Program results for calendar years 1993-2005 confirm that personnel dosimetry is not needed for individuals located in areas monitored by the program.

Bivins, Steven R.; Stoetzel, Gregory A.

2007-07-19T23:59:59.000Z

198

Area Monitoring Dosimeter Program for the Pacific Northwest National Laboratory: Results for CY 2000  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory (PNNL) established an area monitoring dosimeter program in accordance with Article 514 of the Department of Energy (DOE) Radiological Control Manual (RCM) in January 1993. This program is to minimize the number of areas requiring issuance of personnel dosimeters and to demonstrate that doses outside Radiological Buffer Areas are negligible. In accordance with 10 CFR Part 835.402 (a) (1)-(4) and Article 511.1 of the DOE Standard Radiological Control, personnel dosimetry shall be provided to 1) radiological workers who are likely to receive at least 100 mrem annually, and 2) declared pregnant workers, minors, and members of the public who are likely to receive at least 50 mrem annually. Program results for calendar years 1993-2000 confirm that personnel dosimetry is not needed for individuals located in areas monitored by the program.

Bivins, Steven R.; Stoetzel, Gregory A.

2001-07-05T23:59:59.000Z

199

Area Monitoring Dosimeter Program for the Pacific Northwest National Laboratory: Results for CY 2001  

SciTech Connect (OSTI)

Pacific Northwest National Laboratory (PNNL) established an area monitoring dosimeter program in accordance with Article 514 of the U.S. Department of Energy (DOE) Radiological Control Manual (RCM) in January 1993. This program is to minimize the number of areas requiring issuance of personnel dosimeters and to demonstrate that doses outside Radiological Buffer Areas are negligible. In accordance with 10 CFR Part 835.402 (a) (1)-(4) and Article 511.1 of the PNNL Radiological Control Program Description, personnel dosimetry shall be provided to 1) radiological workers who are likely to receive at least 100 mrem annually, and 2) declared pregnant workers, minors, and members of the public who are likely to receive at least 50 mrem annually. Program results for calendar years 1993-2001 confirm that personnel dosimetry is not needed for individuals located in areas monitored by the program.

Bivins, Steven R.; Stoetzel, Gregory A.

2002-07-08T23:59:59.000Z

200

On the merits and feasibility of wildlife monitoring for conservation: a case study from Katavi National Park,  

E-Print Network [OSTI]

wildlife populations, it is currently carried out in surprisingly few protected areas in Africa. Here, data, are presented. These data provide information on large mammal densities, identify declines in populations of sev managers especially in identifying population declines; counts should be employed more often in East Africa

Caro, Tim

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


201

Derived concentration guideline levels for Argonne National Laboratory's building 310 area.  

SciTech Connect (OSTI)

The derived concentration guideline level (DCGL) is the allowable residual radionuclide concentration that can remain in soil after remediation of the site without radiological restrictions on the use of the site. It is sometimes called the single radionuclide soil guideline or the soil cleanup criteria. This report documents the methodology, scenarios, and parameters used in the analysis to support establishing radionuclide DCGLs for Argonne National Laboratory's Building 310 area.

Kamboj, S., Dr.; Yu, C ., Dr. (Environmental Science Division)

2011-08-12T23:59:59.000Z

202

Discovery Park Areas of Expertise  

E-Print Network [OSTI]

characteristics Cyber Center · Computer science - data management, information retrieval, security, privacy, networks, distributed systems, machine learning, computer graphics, mobile devices · Computer technology · Healthcare informatics · Energy ­ security and privacy of advanced meters infrastructures Network

Ginzel, Matthew

203

A checklist of plant and animal species at Los Alamos National Laboratory and surrounding areas  

SciTech Connect (OSTI)

Past and current members of the Biology Team (BT) of the Ecology Group have completed biological assessments (BAs) for all of the land that comprises Los Alamos National Laboratory (LANL). Within these assessments are lists of plant and animal species with the potential to exist on LANL lands and the surrounding areas. To compile these lists, BT members examined earlier published and unpublished reports, surveys, and data bases that pertained to the biota of this area or to areas that are similar. The species lists that are contained herein are compilations of the lists from these BAs, other lists that were a part of the initial research for the performance of these BAs, and more recent surveys.

Hinojosa, H. [comp.

1998-02-01T23:59:59.000Z

204

Area monitoring dosimeter program for the Pacific Northwest National Laboratory: Results for CY 1995  

SciTech Connect (OSTI)

In January 1993, Pacific Northwest National Laboratory (PNNL) established an are monitoring dosimeter program in accordance with the Department of Energy (DOE) Radiological Control Manual (RCM). The purpose of the program was to minimize the number of areas requiring issuance of personnel dosimeters and to demonstrate that doses outside Radiological Buffer Areas are negligible. In accordance with the RCM, personnel dosimetry shall be provided to (1) radiological workers who are likely to receive at least 100 mrem annually and (2) declared pregnant workers, minors, and members of the public who are likely to receive at least 50 mrem annually. Program results confirmed that personnel dosimetry was not needed for individuals located in areas monitored by the program.

Bivins, S.R.; Stoetzel, G.A.

1996-05-01T23:59:59.000Z

205

POLICE, PARKING AND TRANSPORTATION Parking Services  

E-Print Network [OSTI]

" Staff/Faculty, "G" General, and "DP" Discovery Park (Car and Motorcycle) permits o Select the "Parking Staff Permit - $180.00 o "G" General Permit - $115.00 o "MC" Motorcycle Permit - $93.00 o "DP" Discovery Park lots 3 & 4 ­ $36.00 (Both car and Discovery Park motorcycle permits) · If you currently do

Mohanty, Saraju P.

206

Functional requirements of the borrow area and haul route for the Waste Area Grouping projects at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report describes the mission and functional requirements for the development of a borrow area and the associated haul route to support closure and/or remediation of Waste Area Grouping (WAG) 6 and other WAGs at Oak Ridge National Laboratory. This document specifies the basic functional requirements that must be met by the borrow area and haul route developed to produce low-permeability soil for the covers or caps at WAG 6.

Miller, D.G.

1992-09-01T23:59:59.000Z

207

Lake George Park Commission: Stormwater Management (New York)  

Broader source: Energy.gov [DOE]

The Lake George Park Commission is a quasi-independent commission within the Department of Environmental Protection that is responsible for environmental conservation in the Lake George Park area....

208

Remedial investigation of the High-Explosives (HE) Process Area, Lawrence Livermore National Laboratory Site 300  

SciTech Connect (OSTI)

This report presents the results of a Remedial Investigation (RI) to define the extent of high explosives (HE) compounds and volatile organic compounds (VOCs) found in the soil, rocks, and ground water of the HE Process Area of Lawrence Livermore National Laboratory's (LLNL) Site 300 Facility. The report evaluates potential public health environmental risks associated with these compounds. Hydrogeologic information available before February 15, 1990, is included; however, chemical analyses and water-level data are reported through March 1990. This report is intended to assist the California Regional Water Quality Control Board (RWQCB)--Central Valley Region and the US Environmental Protection Agency (EPA) in evaluating the extent of environmental contamination of the LLNL HE Process Area and ultimately in designing remedial actions. 90 refs., 20 figs., 7 tabs.

Crow, N.B.; Lamarre, A.L.

1990-08-01T23:59:59.000Z

209

Underground Test Area Quality Assurance Project Plan Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurance Project Plan, Nevada Test Site, Nevada, Revision 4.

Irene Farnham

2011-05-01T23:59:59.000Z

210

Idaho National Laboratory Driving Directions  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Area Attractions and Events Area Geography Area History Area Links Driving Directions Idaho Falls Attractions and Events INL History INL Today Research Park Sagebrush Steppe...

211

Target area and diagnostic interface issues on the National Ignition Facility (invited)  

SciTech Connect (OSTI)

The National Ignition Facility (NIF) is under construction at Lawrence Livermore National Laboratory for the DOE Stockpile Stewardship Program. It will be used for experiments for inertial confinement fusion ignition, high energy density science, and basic science. Many interface issues confront the experimentalist who wishes to design, fabricate, and install diagnostics, and to help this process, a set of standards and guideline documents is being prepared. Compliance with these will be part of a formal diagnostic design review process. In this article we provide a short description of each, with reference to more complete documentation. The complete documentation will also be available through the NIF Diagnostics web page. Target area interface issues are grouped into three categories. First are the layout and utility interface issues which include the safety analysis report, target area facility layout; target chamber port locations; diagnostic interferences and envelopes; utilities and cable tray distribution; and timing and fiducial systems. Second are the environment interface issues which include radiation electromagnetic interference/electromagnetic pulse effects and mitigation; electrical grounding, shielding, and isolation; and cleanliness and vacuum guidelines. Third are the operational interface issues which include manipulator based target diagnostics, diagnostic alignment, shot life cycle and setup, diagnostic controllers; integrated computer control system; shot data archival; classified operations; and remote operations.

Bell, Perry; Lee, Dean; Wootton, Alan; Mascio, Bill; Kimbrough, Joe; Sewall, Noel; Hibbard, Wilthea; Dohoney, Pat; Landon, Mark; Christianson, George (and others) [and others

2001-01-01T23:59:59.000Z

212

Manhattan Project National Historical Park  

Broader source: Energy.gov [DOE]

The Department, as the direct descendent of the Manhattan Engineer District, owns and manages the Federal properties at most of the major Manhattan Project sites, including Oak Ridge, Tennessee;...

213

CHARTER NATIONAL ENVIRONMENTAL RESEARCH PARKS  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6Energy, science, andAnalysis1 SolelyCHANGE IN ACCEPTABLE

214

An analysis of Utah State Park visitors  

E-Print Network [OSTI]

(camping) use, activities in the parks, group type and state or country of origin, nature of the decision to visit the park, and visitor attitudes. Average Length of Stay For the first two question discussions (average length of stay and day... Yl Ct O O 0 4 0 ttl 0I ID 0 0 Z 31 Nature of the Decision to Visit State Parks In order to better understand the visitor to Utah's State Park areas, four questions will be analyzed in this section. These questions are: 1. Have you been...

Burns, Dennis C.

2012-06-07T23:59:59.000Z

215

Violations & Enforcement Parking Violation Definitions  

E-Print Network [OSTI]

Vehicles parked on a grade should have the emergency brake set. Keys should never be left in the ignition - · Improper parking and failure to park within lines Improper parking includes parking compact vehicles

Hong, Jason I.

216

Public Parking > Agriculture Building Parkade**  

E-Print Network [OSTI]

Engineering Poultry Science Kirk Hall Agriculture Agriculture and Agri-Food Canada SCIENCE PLACE VETERINARY > Agriculture Building Parkade** > Pay Parking Lots** > Stadium Parkade** > Diefenbaker Lot > Health Sciences Parkade** Disabled Persons' Parking* Motorcyle Parking* Faculty & Sta Parking Lots* Student Parking Lots

Saskatchewan, University of

217

Design and initial deployment of the wireless local area networking infrastructure at Sandia National Laboratories.  

SciTech Connect (OSTI)

A major portion of the Wireless Networking Project at Sandia National Laboratories over the last few years has been to examine IEEE 802.11 wireless networking for possible use at Sandia and if practical, introduce this technology. This project team deployed 802.11a, b, and g Wireless Local Area Networking at Sandia. This report examines the basics of wireless networking and captures key results from project tests and experiments. It also records project members thoughts and designs on wireless LAN architecture and security issues. It documents some of the actions and milestones of this project, including pilot and production deployment of wireless networking equipment, and captures the team's rationale behind some of the decisions made. Finally, the report examines lessons learned, future directions, and conclusions.

Long, John P.; Hamill, Michael J.; Mitchell, M. G.; Miller, Marc M.; Witzke, Edward L.; Wiener, Dallas J

2006-11-01T23:59:59.000Z

218

Source document for waste area groupings at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This document serves as a source document for Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and other types of documents developed for and pertaining to Environmental Restoration (ER) Program activities at Oak Ridge National Laboratory (ORNL). It contains descriptions of the (1) regulatory requirements for the ORR ER Program, (2) Oak Ridge Reservation (ORR) ER Program, (3) ORNL site history and characterization, and (4) history and characterization of Waste Area Groupings (WAGS) 1-20. This document was created to save time, effort, and money for persons and organizations drafting documents for the ER Program and to improve consistency in the documents prepared for the program. By eliminating the repetitious use of selected information about the program, this document will help reduce the time and costs associated with producing program documents. By serving as a benchmark for selected information about the ER Program, this reference will help ensure that information presented in future documents is accurate and complete.

Osborne, P.L.; Kuhaida, A.J., Jr.

1996-09-01T23:59:59.000Z

219

Plutonium Surveillance Destructive Examination Requirements at Savannah River National Laboratory for K-Area Interim Surveillance  

SciTech Connect (OSTI)

The DOE 3013 storage standard requires nested, welded 300 series stainless steel containers to store plutonium-bearing materials for up to 50 years. Packaged contents include stabilized plutonium-bearing residues that contain chloride salts and a low (< 0.5 weight %) water content. The DOE 3013 STD requires surveillance of the packages over the 50 year lifetime. These surveillance requirements have been further defined by the Integrated Surveillance Program to include both non-destructive examination (NDE) and destructive examination (DE) of the 3013 container. The DE portion of surveillance involves examining the 3013 nested containers, analyzing the head space gas, and evaluating the plutonium oxide chemistry. At SRS, the stored 3013 containers will undergo preparation for the DE surveillance activities in facilities located in K-Area. The actual DE surveillance will be performed in SRNL. This report provides preliminary functional requirements for the destructive examination (DE) of plutonium-bearing oxide materials and containers in support of K-Area Interim Surveillance (KIS). The KIS project will install interim facilities to prepare the samples for analysis in SRNL. This document covers the requirements for the interim period beginning in 2007, and lasting until the Container Storage and Surveillance Capability (CSSC) project provides the permanent facilities in K-Area to perform sampling and repackaging operations associated with the 3013 container storage and surveillance program. Initial requirements for the CSSC project have been previously defined in WSRC-TR-2004-00584 ''Plutonium Surveillance Destructive Examination Requirements at Savannah River National Laboratory''. As part of the Plutonium Surveillance Program of 3013 Containers at the Savannah River Site (SRS), the Savannah River National Laboratory (SRNL) will receive the emptied 3013 container components, plutonium oxide samples and headspace gas samples from K-Area. The DE program scope includes chemical and metallurgical analyses for a maximum of 25 DE sets a year to provide essential data in support of the SRS Plutonium Surveillance Program. The normal operation is expected to be approximately 15 DE sets a year.

Stefek, T. M.

2005-09-29T23:59:59.000Z

220

Radionuclide contaminant analysis of small mammals at Area G, TA-54, Los Alamos National Laboratory, 1995  

SciTech Connect (OSTI)

At Los Alamos National Laboratory, small mammals were sampled at two waste burial sites (Site 1-recently disturbed and Site 2-partially disturbed) at Area G, Technical Area 54 and a control site on Frijoles Mesa (Site 4) in 1995. Our objectives were (1) to identify radionuclides that are present within surface and subsurface soils at waste burial sites, (2) to compare the amount of radionuclide uptake by small mammals at waste burial sites to a control site, and (3) to identify if the primary mode of contamination to small mammals is by surface contact or ingestion/inhalation. Three composite samples of at least rive animals per sample were collected at each site. Pelts and carcasses of each animal were separated and analyzed independently. Samples were analyzed for {sup 241}Am, {sup 90}Sr , {sup 238}Pu, {sup 239}Pu, total U, {sup 137}Cs, and {sup 3}H. Significantly higher (parametric West at p=0.05) levels of total U, {sup 241}Am, {sup 238}Pu and {sup 239}Pu were detected in pelts than in carcasses of small mammals at TA-54. Concentrations of other measured radionuclides in carcasses were nearly equal to or exceeded the mean concentrations in the pelts. Our results show higher concentrations in pelts compared to carcasses, which is similar to what has been found at waste burial/contaminated sites outside of Los Alamos National Laboratory. Site 1 had a significantly higher (alpha=0.05, P=0.0125) mean tritium concentration in carcasses than Site 2 or Site 4. In addition Site 1 also had a significantly higher (alpha=0.05, p=0.0024) mean tritium concentration in pelts than Site 2 or Site 4. Site 2 had a significantly higher (alpha=0.05, P=0.0499) mean {sup 239}Pu concentration in carcasses than either Site 1 or Site 4.

Bennett, K.; Biggs, J.; Fresquez, P.

1997-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


221

SUSTAINABLE AGROECOSYSTEMS ENTOMOLOGIST, UNIVERSITY OF MARYLAND, COLLEGE PARK The Department of Entomology at the University of Maryland, College Park, seeks a tenuretrack  

E-Print Network [OSTI]

SUSTAINABLE AGROECOSYSTEMS ENTOMOLOGIST, UNIVERSITY OF MARYLAND, COLLEGE PARK The Department will build a nationally prominent, externally funded research program committed to developing sustainable of Entomology at the University of Maryland, College Park, seeks a tenuretrack Assistant Professor

Gruner, Daniel S.

222

Screening of contaminants in Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

Waste Area Grouping 2 (WAG 2) of the Oak Ridge National Laboratory (ORNL) is located in the White Oak Creek Watershed and is composed of White Oak Creek Embayment, White Oak Lake and associated floodplain, and portions of White Oak Creek (WOC) and Melton Branch downstream of ORNL facilities. Contaminants leaving other ORNL WAGs in the WOC watershed pass through WAG 2 before entering the Clinch River. Health and ecological risk screening analyses were conducted on contaminants in WAG 2 to determine which contaminants were of concern and would require immediate consideration for remedial action and which contaminants could be assigned a low priority or further study. For screening purposes, WAG 2 was divided into four geographic reaches: Reach 1, a portion of WOC; Reach 2, Melton Branch; Reach 3, White Oak Lake and the floodplain area to the weirs on WOC and Melton Branch; and Reach 4, the White Oak Creek Embayment, for which an independent screening analysis has been completed. Screening analyses were conducted using data bases compiled from existing data on carcinogenic and noncarcinogenic contaminants, which included organics, inorganics, and radionuclides. Contaminants for which at least one ample had a concentration above the level of detection were placed in a detectable contaminants data base. Those contaminants for which all samples were below the level of detection were placed in a nondetectable contaminants data base.

Blaylock, B.G.; Frank, M.L.; Hoffman, F.O.; Hook, L.A.; Suter, G.W.; Watts, J.A.

1992-07-01T23:59:59.000Z

223

Radionuclides in shallow groundwater at Solid Waste Storage Area 5 North, Oak Ridge National Laboratory  

SciTech Connect (OSTI)

This report presents a compilation of groundwater monitoring data from Solid Waste Storage Area (SWSA) 5 North at Oak Ridge National Laboratory (ORNL) between November 1989 and September 1993. Monitoring data were collected as part of the Active Sites Environmental Monitoring Program that was implemented in 1989 in response to DOE Order 5820.2A. SWSA 5 North was established for the retrievable storage of transuranic (TRU) wastes in 1970. Four types of storage have been used within SWSA 5 North: bunkers, vaults, wells, and trenches. The fenced portion of SWSA 5 North covers about 3.7 ha (9 acres) in the White Oak Creek watershed south of ORNL. The area is bounded by White Oak Creek and two ephemeral tributaries of White Oak Creek. Since 1989, groundwater has been monitored in wells around SWSA 5 North. During that time, elevated gross alpha contamination (reaching as high as 210 Bq/L) has consistently been detected in well 516. This well is adjacent to burial trenches in the southwest corner of the area. Water level measurements in wells 516 and 518 suggest that water periodically inundates the bottom of some of those trenches. Virtually all of the gross alpha contamination is generated by Curium 244 and Americium 241. A special geochemical investigation of well 516 suggests that nearly all of the Curium 44 and Americium 241 is dissolved or associated with dissolved organic matter. These are being transported at the rate of about 2 m/year from the burial trenches, through well 516, to White Oak Creek, where Curium 244 has been detected in a few bank seeps. Concentrations at these seeps are near detection levels (<1 Bq/L).

Ashwood, T.L.; Marsh, J.D. Jr.

1994-04-01T23:59:59.000Z

224

Spatial patterns of cadmium and lead deposition on and adjacent to National Park Service lands in the vicinity of Red Dog Mine, Alaska  

SciTech Connect (OSTI)

Heavy metal escapement associated with ore trucks is known to affect the DeLong Mountain Regional Transportation System (DMTS) haul road corridor in Cape Krusenstern National Monument, northwest Alaska. Tissue concentrations in Hylocomium splendens moss (n = 226) were used to determine the extent and pattern of airborne heavy metal deposition on Monument lands. A stratified grid-based sample design was used with more intensive sampling near mining-related activities. Spatial predictions using geostatistical models were employed to produce maps of depositional patterns, and to estimate the geographic area affected above various thresholds. Spatial regression analyses indicated that heavy metal deposition decreased with the log of distance from the DMTS haul road and the DMTS port site. Analysis of subsurface soil demonstrated that observed patterns of heavy metal deposition reflected in moss tissue concentrations were not attributable to local subsurface lithology. Based on comparisons with regional background data from arctic Alaska, deposition of airborne heavy metals related to mining activities appears to affect the northern half of the Monument. The affected area extends northward (beyond Monument boundaries) through the Kisimilot/Iyikrok hills (north of the Wulik River), and possibly beyond. South of the DMTS haul road, airborne deposition appears to be constrained by the Tahinichok Mountains. Moss tissue concentrations were highest immediately adjacent to the DMTS haul road (Cd > 24 mg/kg dw; Pb > 900 mg/kg dw). The influence of the mine site was not studied.

Hasselbach, L; Ver Hoef, J M.; Ford, Jesse; Neitlich, P; Crecelius, Eric A.; Berryman, Shanti D.; Wolk, B; Boehle, T

2005-04-26T23:59:59.000Z

225

Urban Parks: Responding to Changing Racial and Ethnic Composition  

E-Print Network [OSTI]

im- plications for park and recreation agencies. Hispanics and other ethnic minorities visit state and national parks and national forests at a rate far lower than Anglos. They also are far less likely than Anglos to participate in wildlife... information Allison, M.T. (2000). Leisure and Social Justice. Journal of Leisure Research, 32:2-6. Bureau of the Census. (2002). 2001 National Survey of Fishing, Hunting and Wildlife-Associated Recre- ation: National Overview. Washington, D.C.: U...

Scott, David

2006-11-27T23:59:59.000Z

226

2010 Annual Summary Report for the Area 3 and Area 5 Radioactive Management Sites at the Nevada National Security Site, Nye County, Nevada  

SciTech Connect (OSTI)

The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 Radioactive Waste Management Site (RWMS) Performance Assessments (PAs) and Composite Analyses (CAs) in fiscal year (FY) 2010. This annual summary report presents data and conclusions from the FY 2010 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) (formerly the Nevada Test Site) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs.

NSTec Environmental Management

2011-03-01T23:59:59.000Z

227

Deployment of the National Transparent Optical Network around the San Francisco Bay Area  

SciTech Connect (OSTI)

We report on the deployment and initial operation of the National Transparent Optical Network, an experimental WDM network testbed around the San Francisco Bay Area, during the Optical Fiber Conference (OFC`96) held in San Jose, CA. The deployment aspects of the physical plant, optical and SONET layers are examined along with a discussion of broadband applications which utilized the network during the OFC`96 demonstration. The network features dense WDM technology, transparent optical routing technology using acousto- optic tunable filter based switches, and network modules with add/drop, multicast, and wavelength translation capabilities. The physical layer consisted of over 300 km of Sprint and Pacific Bell conventional single mode fiber which was amplified with I I optical amplifiers deployed in pre-amp, post-amp, and line amp configurations. An out-of-band control network provided datacom channels from remote equipment sites to the SONET network manager deployed at the San Jose Convention Center for the conference. Data transport over five wavelengths was achieved in the 1550 nm window using a variety of signal formats including analog and digital signal transmission on different wavelengths on the same fiber. The network operated throughout the week of OFC`96 and is still in operation today.

McCammon, K.; Haigh, R.; Armstrong, G. [and others

1996-06-01T23:59:59.000Z

228

Early implementation of the Los Alamos National Laboratory Environmental Restoration Program at Technical Area 54  

SciTech Connect (OSTI)

The Los Alamos National Laboratory (LANL) Environmental Restoration (ER) Program at Technical Area (TA) 54 is currently in the RCRA Facility Investigation (RFI) phase of an expanded Resource, Conservation, and Recovery Act (RCRA) corrective action program. Site characterization will focus on filling data gaps in a conceptual model constructed from existing information. An interim remedial measure involving vacuum extraction of a known organic vapor vadose zone plume will be modeled this year and hopefully implemented in fiscal year 1993. Long-term environmental restoration will probably involve vadose zone monitoring to confirm modeling predictions on the performance of existing disposal unit caps. However, it is possible that removal or in-situ treatment of some isolated bad actors'' will be necessary to ensure the long-term success of vapor extraction, or to remove surface hot spots that are unacceptably contributing contaminants to the surface water on air pathways. Public sentiment related to the long-term dedication of TA 54 as a waste disposal facility will have to be factored in early in the process to ensure that the most appropriate data are gathered during site characterization, and to instill confidence, both internally and external to LANL, that the ER Program Office is headed in the right direction at TA 54. 7 refs., 5 figs.

Krueger, J.W.

1991-01-01T23:59:59.000Z

229

Plutonium Equivalent Inventory for Belowground Radioactive Waste at the Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility - Fiscal Year 2011  

SciTech Connect (OSTI)

The Los Alamos National Laboratory (LANL) generates radioactive waste as a result of various activities. Many aspects of the management of this waste are conducted at Technical Area 54 (TA-54); Area G plays a key role in these management activities as the Laboratory's only disposal facility for low-level radioactive waste (LLW). Furthermore, Area G serves as a staging area for transuranic (TRU) waste that will be shipped to the Waste Isolation Pilot Plant for disposal. A portion of this TRU waste is retrievably stored in pits, trenches, and shafts. The radioactive waste disposed of or stored at Area G poses potential short- and long-term risks to workers at the disposal facility and to members of the public. These risks are directly proportional to the radionuclide inventories in the waste. The Area G performance assessment and composite analysis (LANL, 2008a) project long-term risks to members of the public; short-term risks to workers and members of the public, such as those posed by accidents, are addressed by the Area G Documented Safety Analysis (LANL, 2011a). The Documented Safety Analysis uses an inventory expressed in terms of plutonium-equivalent curies, referred to as the PE-Ci inventory, to estimate these risks. The Technical Safety Requirements for Technical Area 54, Area G (LANL, 2011b) establishes a belowground radioactive material limit that ensures the cumulative projected inventory authorized for the Area G site is not exceeded. The total belowground radioactive waste inventory limit established for Area G is 110,000 PE-Ci. The PE-Ci inventory is updated annually; this report presents the inventory prepared for 2011. The approach used to estimate the inventory is described in Section 2. The results of the analysis are presented in Section 3.

French, Sean B. [Los Alamos National Laboratory; Shuman, Rob [WPS: WASTE PROJECTS AND SERVICES

2012-04-18T23:59:59.000Z

230

RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report presents compiled information concerning a facility investigation of waste area group 6(WAG-6), of the solid waste management units (SWMU'S) at Oak Ridge National Laboratory (ORNL). The WAG is a shallow ground disposal area for low-level radioactive wastes and chemical wastes. The report contains information on hydrogeological data, contaminant characterization, radionuclide concentrations, risk assessment from doses to humans and animals and associated cancer risks, exposure via food chains, and historical data. (CBS)

Not Available

1991-09-01T23:59:59.000Z

231

Conference Topic: Integrated Water Resources and Coastal Areas Management National Water Information Systems: A Tool to Support Integrated Water Resources  

E-Print Network [OSTI]

Conference Topic: Integrated Water Resources and Coastal Areas Management National Water Information Systems: A Tool to Support Integrated Water Resources Management in the Caribbean Marie-Claire St of Integrated Water Resources Management (IWRM) in the Caribbean and to address the problems

Barthelat, Francois

232

Abstract--Joshua Tree National Monument's nursery created methods for using native desert vegetation on disturbed areas in  

E-Print Network [OSTI]

, these containers offer benefits for use in remote areas, such as abandoned mine sites. Joshua Tree National, used along roadsides following road im- provements, on closed dirt roads and jeep trails, abandoned mine sites, as well as for facilities landscaping, and his- toric plant restoration. Joshua Tree's work

233

2010 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant  

SciTech Connect (OSTI)

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2009, through October 31, 2010. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of special compliance conditions • Discussion of the facility’s environmental impacts. During the 2010 permit year, approximately 2.2 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Area Sewage Treatment plant.

Mike lewis

2011-02-01T23:59:59.000Z

234

2011 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant  

SciTech Connect (OSTI)

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site's Central Facilities Area Sewage Treatment Plant from November 1, 2010, through October 31, 2011. The report contains the following information: (1) Site description; (2) Facility and system description; (3) Permit required monitoring data and loading rates; (4) Status of special compliance conditions and activities; and (5) Discussion of the facility's environmental impacts. During the 2011 permit year, approximately 1.22 million gallons of treated wastewater was land-applied to the irrigation area at Central Facilities Area Sewage Treatment plant.

Michael G. Lewis

2012-02-01T23:59:59.000Z

235

2012 Annual Wastewater Reuse Report for the Idaho National Laboratory Site's Central facilities Area Sewage Treatment Plant  

SciTech Connect (OSTI)

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2011, through October 31, 2012. The report contains the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2012 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant.

Mike Lewis

2013-02-01T23:59:59.000Z

236

Underground Test Area Fiscal Year 2013 Annual Quality Assurance Report Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This report is required by the Underground Test Area (UGTA) Quality Assurance Plan (QAP) and identifies the UGTA quality assurance (QA) activities for fiscal year (FY) 2013. All UGTA organizations—U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO); Desert Research Institute (DRI); Lawrence Livermore National Laboratory (LLNL); Los Alamos National Laboratory (LANL); Navarro-Intera, LLC (N-I); National Security Technologies, LLC (NSTec); and the U.S. Geological Survey (USGS)—conducted QA activities in FY 2013. The activities included conducting assessments, identifying findings and completing corrective actions, evaluating laboratory performance, and publishing documents. In addition, integrated UGTA required reading and corrective action tracking was instituted.

Krenzien, Susan; Marutzky, Sam

2014-01-01T23:59:59.000Z

237

Underground Test Area Fiscal Year 2012 Annual Quality Assurance Report Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This report is mandated by the Underground Test Area (UGTA) Quality Assurance Project Plan (QAPP) and identifies the UGTA quality assurance (QA) activities for fiscal year (FY) 2012. All UGTA organizations—U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO); Desert Research Institute (DRI); Lawrence Livermore National Laboratory (LLNL); Los Alamos National Laboratory (LANL); Navarro-Intera, LLC (N-I); National Security Technologies, LLC (NSTec); and the U.S. Geological Survey (USGS)—conducted QA activities in FY 2012. The activities included conducting assessments, identifying findings and completing corrective actions, evaluating laboratory performance, revising the QAPP, and publishing documents. In addition, processes and procedures were developed to address deficiencies identified in the FY 2011 QAPP gap analysis.

Farnham, Irene; Marutzky, Sam

2013-01-01T23:59:59.000Z

238

Jackson Park Hospital Green Building Medical Center  

SciTech Connect (OSTI)

Jackson Park Hospital completed the construction of a new Medical Office Building on its campus this spring. The new building construction has adopted the City of Chicago�s recent focus on protecting the environment, and conserving energy and resources, with the introduction of green building codes. Located in a poor, inner city neighborhood on the South side of Chicago, Jackson Park Hospital has chosen green building strategies to help make the area a better place to live and work.

William Dorsey; Nelson Vasquez

2010-03-01T23:59:59.000Z

239

The National Natural Landmark Program: A Natural Areas Protection Technique for the 1980s and Beyond  

E-Print Network [OSTI]

protected is more or less available for passive recreation by the public unless it is an extremely sensitive natural area.

Cohen, Russell A.

1982-01-01T23:59:59.000Z

240

Class 1 Permit Modification Notification Addition of Structures within Technical Area 54, Area G, Pad 11, Dome 375 Los Alamos National Laboratory Hazardous Waste Facility Permit, July 2012  

SciTech Connect (OSTI)

The purpose of this letter is to notify the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of a Class 1 Permit Modification to the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit issued to the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) in November 2010. The modification adds structures to the container storage unit at Technical Area (TA) 54 Area G, Pad 11. Permit Section 3.1(3) requires that changes to the location of a structure that does not manage hazardous waste shall be changed within the Permit as a Class 1 modification without prior approval in accordance with Code of Federal Regulations, Title 40 (40 CFR), {section}270.42(a)(1). Structures have been added within Dome 375 located at TA-54, Area G, Pad 11 that will be used in support of waste management operations within Dome 375 and the modular panel containment structure located within Dome 375, but will not be used as waste management structures. The Class 1 Permit Modification revises Figure 36 in Attachment N, Figures; and Figure G.12-1 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Descriptions of the structures have also been added to Section A.4.2.9 in Attachment A, TA - Unit Descriptions; and Section 2.0 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Full description of the permit modification and the necessary changes are included in Enclosure 1. The modification has been prepared in accordance with 40 CFR {section}270.42(a)(l). This package includes this letter and an enclosure containing a description of the permit modification, text edits of the Permit sections, and the revised figures (collectively LA-UR-12-22808). Accordingly, a signed certification page is also enclosed. Three hard copies and one electronic copy of this submittal will be delivered to the NMED-HWB.

Vigil-Holterman, Luciana R. [Los Alamos National Laboratory; Lechel, Robert A. [Los Alamos National Laboratory

2012-08-31T23:59:59.000Z

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


241

AREA  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergy Cooperation |South Valley ResponsibleSubmissionofDepartmentNo.7-052 ofFocusAREA FAQ #

242

Closure Report for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.

NSTec Environmental Restoration

2012-02-21T23:59:59.000Z

243

VISITOR PARKING Pay station parking meters are available around  

E-Print Network [OSTI]

temporary parking needs. Daily scratch-off permits are available in advance from Parking Services. LOT METER PAY STATION RATES (SUMMER RATES MAY BE DISCOUNTED) HOW DO I GET A PERMIT? When parking on campus, a CSM parking permit is required Monday through Friday, from 7AM until 5 PM. Permits authorize parking

244

Protection of Public Parks and Recreational Lands (Texas)  

Broader source: Energy.gov [DOE]

A program or project that requires the use of a public park, recreational area, scientific area, wildlife refuge, or historic site may not be approved by any department, agency, political...

245

EA-1212: Lease of Land for the Development of a Research Park at Los Alamos National Laboratory, Los Alamos, New Mexico  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts for the proposal to lease undeveloped land that is part of the U.S. Department of Energy's Los Alamos National Laboratory in Los Alamos, New Mexico, to...

246

Site characterization plan for groundwater in Waste Area Grouping 1 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Waste Area Grouping (WAG) 1 Groundwater Operable Unit (OU) at Oak Ridge National Laboratory (ORNL) in Oak Ridge, Tennessee, is undergoing a site characterization to identify environmental contamination that may be present. This document, Site Characterization Report for Groundwater in Waste Area Grouping I at Oak Ridge National Laboratory, Oak Ridge, Tennessee, identifies areas of concern with respect to WAG 1 groundwater and presents the rationale, justification, and objectives for conducting this continuing site characterization. This report summarizes the operations that have taken place at each of the areas of concern in WAG 1, summarizes previous characterization studies that have been performed, presents interpretations of previously collected data and information, identifies contaminants of concern, and presents an action plan for further site investigations and early actions that will lead to identification of contaminant sources, their major groundwater pathways, and reduced off-site migration of contaminated groundwater to surface water. Site characterization Activities performed to date at WAG I have indicated that groundwater contamination, principally radiological contamination, is widespread. An extensive network of underground pipelines and utilities have contributed to the dispersal of contaminants to an unknown extent. The general absence of radiological contamination in surface water at the perimeter of WAG 1 is attributed to the presence of pipelines and underground waste storage tank sumps and dry wells distributed throughout WAG 1 which remove more than about 40 million gal of contaminated groundwater per year.

Lee, R.R.; Curtis, A.H.; Houlberg, L.M.; Purucker, S.T.; Singer, M.L.; Tardiff, M.F.; Wolf, D.A.

1994-07-01T23:59:59.000Z

247

2013 Annual Wastewater Reuse Report for the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant  

SciTech Connect (OSTI)

This report describes conditions, as required by the state of Idaho Wastewater Reuse Permit (#LA-000141-03), for the wastewater land application site at the Idaho National Laboratory Site’s Central Facilities Area Sewage Treatment Plant from November 1, 2012, through October 31, 2013. The report contains, as applicable, the following information: • Site description • Facility and system description • Permit required monitoring data and loading rates • Status of compliance conditions and activities • Discussion of the facility’s environmental impacts. During the 2013 permit year, no wastewater was land-applied to the irrigation area of the Central Facilities Area Sewage Treatment Plant and therefore, no effluent flow volumes or samples were collected from wastewater sampling point WW-014102. However, soil samples were collected in October from soil monitoring unit SU-014101.

Mike Lewis

2014-02-01T23:59:59.000Z

248

Summary of environmental characterization activities at the Oak Ridge National Laboratory Solid Waste Storage Area Six, FY 1986 through 1987  

SciTech Connect (OSTI)

The Oak Ridge National Laboratory (ORNL) Remedial Action Program (RAP), has supported characterization activities in Solid Waste Storage Area (SWSA 6) to acquire information necessary for identification and planning of remedial actions that may be warranted, and to facilitate eventual closure of the site. In FY 1986 investigations began in the areas of site hydrology, geochemistry, soils, geology, and geohydrologic model application. This report summarizes work carried out in each of these areas during FY`s 1986 and 1987 and serves as a status report pulling together the large volume of data that has resulted. Characterization efforts are by no means completed; however, a sufficient data base has been generated to begin data interpretation and analysis of site contaminants.

Davis, E.C.; Solomon, D.K.; Dreier, R.B.; Lee, S.Y.; Kelmers, A.D.; Lietzke, D.A. [Oak Ridge National Lab., TN (United States); Craig, P.M. [Environmental Consulting Engineers, Inc., Knoxville, TN (United States)

1987-09-30T23:59:59.000Z

249

Summary of environmental characterization activities at the Oak Ridge National Laboratory Solid Waste Storage Area Six, FY 1986 through 1987  

SciTech Connect (OSTI)

The Oak Ridge National Laboratory (ORNL) Remedial Action Program (RAP), has supported characterization activities in Solid Waste Storage Area (SWSA 6) to acquire information necessary for identification and planning of remedial actions that may be warranted, and to facilitate eventual closure of the site. In FY 1986 investigations began in the areas of site hydrology, geochemistry, soils, geology, and geohydrologic model application. This report summarizes work carried out in each of these areas during FY's 1986 and 1987 and serves as a status report pulling together the large volume of data that has resulted. Characterization efforts are by no means completed; however, a sufficient data base has been generated to begin data interpretation and analysis of site contaminants.

Davis, E.C.; Solomon, D.K.; Dreier, R.B.; Lee, S.Y.; Kelmers, A.D.; Lietzke, D.A. (Oak Ridge National Lab., TN (United States)); Craig, P.M. (Environmental Consulting Engineers, Inc., Knoxville, TN (United States))

1987-09-30T23:59:59.000Z

250

Area Monitoring Dosimeter Program for the Pacific Northwest National Laboratory: Results for CY 1999  

SciTech Connect (OSTI)

In January 1993, PNNL established an area monitoring dosimeter program in accordance with Article 514 of the DOE Radiological Control Manual. This program was to minimize the number of areas requiring issuance of personnel dosimeters and to demonstrate that doses outside Radiological Buffer Areas are negligible. In accordance with 10 CFR Part 835.402 (a)(1)-(4) and Article 511.1 of the DOE Standard Radiological Control, personnel dosimetry shall be provided to 1) radiological workers who are likely to receive at least 100 mrem annually and 2) declared pregnant workers, minors, and members of the public who are likely to receive at least 50 mrem annually. Program results for calendar years 1993-1998 confirmed that personnel dosimetry was not needed for individuals located in areas monitored by the program. A total of 123 area thermoluminescent dosimeters (TLDs) were placed in PNNL facilities during calendar year 1999. The TLDs were exchanged and analyzed quarterly. All routine area monitoring TLD results were less than 50 mrem annually after correcting for worker occupancy. The results support the conclusion that personnel dosimeters are not necessary for staff, declared pregnant workers, minors, or members of the public in these monitored areas.

Bivins, Steven R.; Stoetzel, Gregory A.

2000-09-19T23:59:59.000Z

251

Idaho National Engineering Laboratory, Test Area North, Hangar 629 -- Photographs, written historical and descriptive data  

SciTech Connect (OSTI)

The report describes the history of the Idaho National Engineering Laboratory`s Hangar 629. The hangar was built to test the possibility of linking jet engine technology with nuclear power. The history of the project is described along with the development and eventual abandonment of the Flight Engine Test hangar. The report contains historical photographs and architectural drawings.

NONE

1994-12-31T23:59:59.000Z

252

Discovery Park Impact NNSA PRISM Center for  

E-Print Network [OSTI]

Discovery Park Impact NNSA PRISM Center for Prediction of Reliability, Integrity and Survivability in PRISM. Purdue is one of 5 centers funded under NNSA's Predictive Science Academic Alliance Program Computing, a division of Information Technology at Purdue. The NNSA national laboratories will be involved

Holland, Jeffrey

253

National Institute for Advanced Transportation Technology A N N U A L R E P O R T A U G U S T 2 0 0 2  

E-Print Network [OSTI]

for Clean Vehicle Technology relates to the area's environmental concerns of preserving national parks1 National Institute for Advanced Transportation Technology A N N U A L R E P O R T · A U G U S T 2;2 Theme: Advanced Transportation Technology M I S S I O N Our mission is to work with industry, government

Kyte, Michael

254

Adapting state and national electricity consumption forecasting methods to utility service areas. Final report  

SciTech Connect (OSTI)

This report summarizes the experiences of six utilities (Florida Power and Light Co., Municipal Electric Authority of Georgia, Philadelphia Electric Co., Public Service Co. of Colorado, Sacramento Municipal Utility District, and TVA) in adapting to their service territories models that were developed for forecasting loads on a national or regional basis. The models examined were of both end-use and econometric design and included the three major customer classes: residential, commercial, and industrial.

Swift, M.A.

1984-07-01T23:59:59.000Z

255

Closure Report for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 [as amended March 2010]). CAU 116 consists of the following two Corrective Action Sites (CASs), located in Area 25 of the Nevada National Security Site: (1) CAS 25-23-20, Nuclear Furnace Piping and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 consisted of Building 3210 and the attached concrete shield wall. CAS 25-23-20 consisted of the nuclear furnace piping and tanks. Closure activities began in January 2007 and were completed in August 2011. Activities were conducted according to Revision 1 of the Streamlined Approach for Environmental Restoration Plan for CAU 116 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2008). This CR provides documentation supporting the completed corrective actions and provides data confirming that closure objectives for CAU 116 were met. Site characterization data and process knowledge indicated that surface areas were radiologically contaminated above release limits and that regulated and/or hazardous wastes were present in the facility.

NSTec Environmental Restoration

2011-09-29T23:59:59.000Z

256

Cultural Resource Assessment of the Test Area North Demolition Landfill at the Idaho National Engineering and Environmental Laboratory  

SciTech Connect (OSTI)

The proposed new demolition landfill at Test Area North on the Idaho National Engineering and Environmental Laboratory (INEEL) will support ongoing demolition and decontamination within the facilities on the north end of the INEEL. In June of 2003, the INEEL Cultural Resource Management Office conducted archival searches, field surveys, and coordination with the Shoshone-Bannock Tribes to identify all cultural resources that might be adversely affected by the project and to provide recommendations to protect those listed or eligible for listing on the National Register of Historic Places. These investigations showed that landfill construction and operation would affect two significant cultural resources. This report outlines protective measures to ensure that these effects are not adverse.

Brenda R. Pace

2003-07-01T23:59:59.000Z

257

HISTORICAL AMERICAN ENGINEERING RECORD - IDAHO NATIONAL ENGINEERING AND ENVIRONMENTAL LABORATORY, TEST AREA NORTH, HAER NO. ID-33-E  

SciTech Connect (OSTI)

Test Area North (TAN) was a site of the Aircraft Nuclear Propulsion (ANP) Project of the U.S. Air Force and the Atomic Energy Commission. Its Cold War mission was to develop a turbojet bomber propelled by nuclear power. The project was part of an arms race. Test activities took place in five areas at TAN. The Assembly & Maintenance area was a shop and hot cell complex. Nuclear tests ran at the Initial Engine Test area. Low-power test reactors operated at a third cluster. The fourth area was for Administration. A Flight Engine Test facility (hangar) was built to house the anticipated nuclear-powered aircraft. Experiments between 1955-1961 proved that a nuclear reactor could power a jet engine, but President John F. Kennedy canceled the project in March 1961. ANP facilities were adapted for new reactor projects, the most important of which were Loss of Fluid Tests (LOFT), part of an international safety program for commercial power reactors. Other projects included NASA's Systems for Nuclear Auxiliary Power and storage of Three Mile Island meltdown debris. National missions for TAN in reactor research and safety research have expired; demolition of historic TAN buildings is underway.

Susan Stacy; Hollie K. Gilbert

2005-02-01T23:59:59.000Z

258

PARKING MAP Sales Office  

E-Print Network [OSTI]

PARKING MAP BayDr. Main Entrance Parking Sales Office Main Entrance Kiosk East Remote Lot, B, C111, MC, N, NC, , Medical M 2hr 112 Core West Structure A, B, EV, MC, N, NC, , Medical P 2hr 113

Wilmers, Chris

259

& Education Structure 2 Parking  

E-Print Network [OSTI]

Cinema East Hall University Technology Services Honors Stratford Building Parkway Science Building 1N Kononia House Fourth Ave Building Art Building Science & Education Center Parking Structure 2 Helen Gordon Child Center Science Research & Teaching Center Parking Structure 3 Ho man Hall West

Caughman, John

260

PARKS, RECREATION & TOURISM Concentration in  

E-Print Network [OSTI]

PARKS, RECREATION & TOURISM Concentration in Conservation Law Enforcement School Experience in Parks, Recreation, and Tourism 1 Semester 5 Semester 6 SFR 434/534 - Recreation Site Planning

Thomas, Andrew

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


261

Dead Mans Run parking for  

E-Print Network [OSTI]

@unlnotes.unl.edu or telephone: at (402) 472-1800. Current as of August 27, 2012 Motorcycle Parking Motorcycle Parking 32 5 6 5 5

Farritor, Shane

262

Modeling Aeolian Transport of Contaminated Sediments at Los Alamos National Laboratory, Technical Area 54, Area G: Sensitivities to Succession, Disturbance, and Future Climate  

SciTech Connect (OSTI)

The Technical Area 54 (TA-54) Area G disposal facility is used for the disposal of radioactive waste at Los Alamos National Laboratory (LANL). U.S. Department of Energy (DOE) Order 435.1 (DOE, 2001) requires that radioactive waste be managed in a manner that protects public health and safety and the environment. In compliance with that requirement, DOE field sites must prepare and maintain site-specific radiological performance assessments for facilities that receive waste after September 26, 1988. Sites are also required to conduct composite analyses for facilities that receive waste after this date; these analyses account for the cumulative impacts of all waste that has been (and will be) disposed of at the facilities and other sources of radioactive material that may interact with these facilities. LANL issued Revision 4 of the Area G performance assessment and composite analysis in 2008. In support of those analyses, vertical and horizontal sediment flux data were collected at two analog sites, each with different dominant vegetation characteristics, and used to estimate rates of vertical resuspension and wind erosion for Area G. The results of that investigation indicated that there was no net loss of soil at the disposal site due to wind erosion, and suggested minimal impacts of wind on the long-term performance of the facility. However, that study did not evaluate the potential for contaminant transport caused by the horizontal movement of soil particles over long time frames. Since that time, additional field data have been collected to estimate wind threshold velocities for initiating sediment transport due to saltation and rates of sediment transport once those thresholds are reached. Data such as these have been used in the development of the Vegetation Modified Transport (VMTran) model. This model is designed to estimate patterns and long-term rates of contaminant redistribution caused by winds at the site, taking into account the impacts of plant succession and environmental disturbance. Aeolian, or wind-driven, sediment transport drives soil erosion, affects biogeochemical cycles, and can lead to the transport of contaminants. Rates of aeolian sediment transport depend in large part on the type, amount, and spatial pattern of vegetation. In particular, the amount of cover from trees and shrubs, which act as roughness elements, alters rates of aeolian sediment transport. The degree to which the understory is disturbed and the associated spacing of bare soil gaps further influence sediment transport rates. Changes in vegetation structure and patterns over periods of years to centuries may have profound impacts on rates of wind-driven transport. For recently disturbed areas, succession is likely to occur through a series of vegetation communities. Area G currently exhibits a mosaic of vegetation cover, with patches of grass and forbs over closed disposal units, and bare ground in heavily used portions of the site. These areas are surrounded by less disturbed regions of shrubland and pinon-juniper woodland; some ponderosa pine forest is also visible in the canyon along the road. The successional trajectory for the disturbed portions of Area G is expected to proceed from grasses and forbs (which would be established during site closure), to shrubs such as chamisa, to a climax community of pinon-juniper woodland. Although unlikely under current conditions, a ponderosa pine forest could develop over the site if the future climate is wetter. In many ecosystems, substantial and often periodic disturbances such as fire or severe drought can rapidly alter vegetation patterns. Such disturbances are likely to increase in the southwestern US where projections call for a warmer and drier climate. With respect to Area G, the 3 most likely disturbance types are surface fire, crown fire, and drought-induced tree mortality. Each type of disturbance has a different frequency or likelihood of occurrence, but all 3 tend to reset the vegetation succession cycle to earlier stages. The Area G performance assessment and composite an

Whicker, Jeffrey J. [Los Alamos National Laboratory; Kirchner, Thomas B. [New Mexico State University; Breshears, David D. [University of Arizona; Field, Jason P. [University of Arizona

2012-03-27T23:59:59.000Z

263

The impact of camping activity on vegetation and soils: a case study at Tyler State Park  

E-Print Network [OSTI]

mary camping areas. TYLER g STATE PARK TYLER 0 200 EMIT CO Ml Fig. 1. Location of Tyler State Park in Texas. TYLER STATE PARK &al AMPHITHEATER LAKEVEW MULTI-USE FISHINI CAMPING AREA P CEDAR POINT MULTI-USE AREA HEADOUARTERS QP P P... of Tyler State Park Fig. 3. Tent-camping site, Tyler State Park -'-' ~ '4NB54lsSIRa~+ Fig. 4. 11ulti-use sites, Lakeview unit. VEGETAT)ON REG(ONS + STYLER m- + DESERT SHRUS SAVANNA g MESQUITE ? CHAPARRAL SAVANNA Q JUNIPER ? OAK ? MESQUITE SAVANNA...

Koehler, Janet Elaine

1979-01-01T23:59:59.000Z

264

Nevada National Security Site 2012 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site  

SciTech Connect (OSTI)

This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2012 results. During 2012, groundwater samples were collected and static water levels were measured at the three pilot wells surrounding the Area 5 RWMS. Groundwater samples were collected at UE5PW-1, UE5PW-2, and UE5PW-3 on March 21, August 7, August 21, and September 11, 2012, and static water levels were measured at each of the three pilot wells on March 19, June 6, August 2, and October 15, 2012. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Final results from samples collected in 2012 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

NSTec Environmental Management

2013-02-11T23:59:59.000Z

265

Nevada National Security Site 2010 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site  

SciTech Connect (OSTI)

This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2010 results. During 2010, groundwater samples were collected and static water levels were measured at the three pilot wells surrounding the Area 5 RWMS. Samples were collected at UE5PW-1 on March 10 and August 10, 2010; at UE5PW-2 on March 10, August 10, and August 25, 2010; and at UE5PW-3 on March 31, August 10, and August 25, 2010. Static water levels were measured at each of the three pilot wells on March 1, April 26, August 9, and November 9, 2010. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Results from all samples collected in 2010 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

NSTec Environmental Management

2011-01-01T23:59:59.000Z

266

Hydrogeochemical and stream-sediment reconnaissance, orientation study, Ouachita Mountain area, Arkansas. National Uranium Resource Evaluation Program  

SciTech Connect (OSTI)

A hydrogeochemical ground water orientation study was conducted in the multi-mineralized area of the Ouachita Mountains, Arkansas in order to evaluate the usefulness of ground water as a sampling medium for uranium exploration in similar areas. Ninety-three springs and nine wells were sampled in Clark, Garland, Hot Springs, Howard, Montgomery, Pike, Polk, and Sevier Counties. Manganese, barite, celestite, cinnabar, stibnite, copper, lead, and zinc are present. The following parameters were determined: pH, conductivity, alkalinity, U, Br, Cl, F, He, Mn, Na, V, Al, Dy, NO/sub 3/, NH/sub 3/, SO/sub 4/, and PO/sub 4/. The minerals appear to significantly affect the chemistry of the ground water. This report is issued in draft form, without detailed technical and copy editing. This was done to make the report available to the public before the end of the National Uranium Resource Evaluation.

Steele, K. F.

1982-08-01T23:59:59.000Z

267

Nevada National Security Site 2011 Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site  

SciTech Connect (OSTI)

This report is a compilation of the groundwater sampling results from the Area 5 Radioactive Waste Management Site (RWMS). The data have been collected since 1993 and include calendar year 2011 results. During 2011, groundwater samples were collected and static water levels were measured at the three pilot wells surrounding the Area 5 RWMS. Samples were collected at UE5PW-1 on March 8, August 2, August 24, and October 19, 2011; at UE5PW-2 on March 8, August 2, August 23, and October 19, 2011; and at UE5PW-3 on March 8, August 2, August 23, and October 19, 2011. Static water levels were measured at each of the three pilot wells on March 1, June 7, August 1, and October 17, 2011. Groundwater samples were analyzed for the following indicators of contamination: pH, specific conductance, total organic carbon, total organic halides, and tritium. Indicators of general water chemistry (cations and anions) were also measured. Initial total organic carbon and total organic halides results for samples collected in August 2011 were above previous measurements and, in some cases, above the established investigation limits. However, after field sample pumps and tubing were disinfected with Clorox solution, the results returned to normal levels. Final results from samples collected in 2011 were within the limits established by agreement with the Nevada Division of Environmental Protection for each analyte. These data indicate that there has been no measurable impact to the uppermost aquifer from the Area 5 RWMS. There were no significant changes in measured groundwater parameters compared to previous years. The report contains an updated cumulative chronology for the Area 5 RWMS Groundwater Monitoring Program and a brief description of the site hydrogeology.

NSTec Environmental Management

2012-02-27T23:59:59.000Z

268

Evaluation of Low-Level Waste Disposal Receipt Data for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility - Fiscal Year 2011  

SciTech Connect (OSTI)

The Los Alamos National Laboratory (LANL or the Laboratory) generates radioactive waste as a result of various activities. Operational or institutional waste is generated from a wide variety of research and development activities including nuclear weapons development, energy production, and medical research. Environmental restoration (ER), and decontamination and decommissioning (D and D) waste is generated as contaminated sites and facilities at LANL undergo cleanup or remediation. The majority of this waste is low-level radioactive waste (LLW) and is disposed of at the Technical Area 54 (TA-54), Area G disposal facility. U.S. Department of Energy (DOE) Order 435.1 (DOE, 2001) requires that radioactive waste be managed in a manner that protects public health and safety, and the environment. To comply with this order, DOE field sites must prepare and maintain site-specific radiological performance assessments for LLW disposal facilities that accept waste after September 26, 1988. Furthermore, sites are required to conduct composite analyses that account for the cumulative impacts of all waste that has been (or will be) disposed of at the facilities and other sources of radioactive material that may interact with the facilities. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 (LANL, 2008). These analyses estimate rates of radionuclide release from the waste disposed of at the facility, simulate the movement of radionuclides through the environment, and project potential radiation doses to humans for several on-site and off-site exposure scenarios. The assessments are based on existing site and disposal facility data and on assumptions about future rates and methods of waste disposal. The accuracy of the performance assessment and composite analysis depends upon the validity of the data used and assumptions made in conducting the analyses. If changes in these data and assumptions are significant, they may invalidate or call into question certain aspects of the analyses. For example, if the volumes and activities of waste disposed of during the remainder of the disposal facility's lifetime differ significantly from those projected, the doses projected by the analyses may no longer apply. DOE field sites are required to implement a performance assessment and composite analysis maintenance program. The purpose of this program is to ensure the continued applicability of the analyses through incremental improvement of the level of understanding of the disposal site and facility. Site personnel are required to conduct field and experimental work to reduce the uncertainty in the data and models used in the assessments. Furthermore, they are required to conduct periodic reviews of waste receipts, comparing them to projected waste disposal rates. The radiological inventory for Area G was updated in conjunction with Revision 4 of the performance assessment and composite analysis (Shuman, 2008). That effort used disposal records and other sources of information to estimate the quantities of radioactive waste that have been disposed of at Area G from 1959, the year the facility started receiving waste on a routine basis, through 2007. It also estimated the quantities of LLW that will require disposal from 2008 through 2044, the year in which it is assumed that disposal operations at Area G will cease. This report documents the fourth review of Area G disposal receipts since the inventory was updated and examines information for waste placed in the ground during fiscal years (FY) 2008 through 2011. The primary objective of the disposal receipt review is to ensure that the future waste inventory projections developed for the performance assessment and composite analysis are consistent with the actual types and quantities of waste being disposed of at Area G. Toward this end, the disposal data that are the subject of this review are used to update the future waste inventory projections for the disposal facility. These projections are compared to the future inventory projections that were develope

French, Sean B. [Los Alamos National Laboratory; Shuman, Robert [WPS: WASTE PROJECTS AND SERVICES

2012-04-17T23:59:59.000Z

269

X-ray area backlighter development at the National Ignition Facility (invited)  

SciTech Connect (OSTI)

1D spectral imaging was used to characterize the K-shell emission of Z ? 30–35 and Z ? 40–42 laser-irradiated foils at the National Ignition Facility. Foils were driven with up to 60 kJ of 3? light, reaching laser irradiances on target between 0.5 and 20 × 10{sup 15} W/cm{sup 2}. Laser-to-X-ray conversion efficiency (CE) into the He{sub ?} line (plus satellite emission) of 1.0%–1.5% and 0.15%–0.2% was measured for Z ? 30–32 and Z ? 40–42, respectively. Measured CE into He{sub ?} (plus satellite emission) of Br (Z = 35) compound foils (either KBr or RbBr) ranged between 0.16% and 0.29%. Measured spectra are compared with 1D non-local thermodynamic equilibrium atomic kinetic and radiation transport simulations, providing a fast and accurate predictive capability.

Barrios, M. A., E-mail: barriosgarci1@llnl.gov; Fournier, K. B.; Smith, R.; Lazicki, A.; Rygg, R.; Fratanduono, D. E.; Eggert, J.; Park, H.-S.; Huntington, C.; Bradley, D. K.; Landen, O. L.; Collins, G. W. [Lawrence Livermore National Laboratory, Livermore, California 94550 (United States); Regan, S. P.; Epstein, R. [Laboratory for Laser Energetics, University of Rochester, Rochester, New York 14623 (United States)

2014-11-15T23:59:59.000Z

270

Corrective Action Plan for Corrective Action Unit 366: Area 11 Plutonium Valley Dispersion Sites, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 366, Area 11 Plutonium Valley Dispersion Sites, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996 as amended). CAU 366 consists of the following six Corrective Action Sites (CASs) located in Area 11 of the Nevada National Security Site: · CAS 11-08-01, Contaminated Waste Dump #1 · CAS 11-08-02, Contaminated Waste Dump #2 · CAS 11-23-01, Radioactively Contaminated Area A · CAS 11-23-02, Radioactively Contaminated Area B · CAS 11-23-03, Radioactively Contaminated Area C · CAS 11-23-04, Radioactively Contaminated Area D Site characterization activities were performed in 2011 and 2012, and the results are presented in Appendix A of the Corrective Action Decision Document (CADD) for CAU 366 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2012a). The following closure alternatives were recommended in the CADD: · No further action for CAS 11-23-01 · Closure in place for CASs 11-08-01, 11-08-02, 11-23-02, 11-23-03, and 11-23-04 The scope of work required to implement the recommended closure alternatives includes the following: · Non-engineered soil covers approximately 3 feet thick will be constructed at CAS 11-08-01 over contaminated waste dump (CWD) #1 and at CAS 11-08-02 over CWD #2. · FFACO use restrictions (URs) will be implemented for the areas where the total effective dose (TED) exceeds the final action level (FAL) of 25 millirems per Occasional Use Area year (mrem/OU-yr). The FAL is based on an assumption that the future use of the site includes occasional work activities and that workers will not be assigned to the area on a regular basis. A site worker under this scenario is assumed to be on site for a maximum of 80 hours per year for 5 years. The FFACO UR boundaries will encompass the areas where a worker would be exposed to 25 millirems of radioactivity per year if they are present for 80 hours per year. These boundaries will be defined as follows: – It is assumed that radiological contaminants are present at CAS 11-08-01 and CAS 11-08-02 within CWDs #1 and #2 at levels exceeding the FAL. Therefore, UR boundaries will be established around the perimeters of the soil covers that will be constructed at CWD #1 and CWD #2. A geophysical survey revealed buried metallic debris outside the fence and adjacent to CWD #1. Therefore, the UR boundary for CWD #1 will be expanded to include the mound containing buried material. – It is assumed that radiological contaminants are present at CAS 11-23-02, CAS 11-23-03, and CAS 11-23-04, within the three High Contamination Area (HCA) boundaries associated with the 11b, 11c, and 11d test areas at levels exceeding the FAL. Therefore, the UR boundaries will be established around the perimeters of the HCAs. The TED at an area of soil impacted by radiological debris outside the fence and adjacent to the 11c test area HCA exceeds the FAL of 25 mrem/OU-yr. Because the radiological impact from the debris at this location is visible on the aerial flyover radiological survey, all other areas within this isopleth of the flyover survey are conservatively also assumed to exceed the FAL. Therefore, the UR boundaries for the 11b, 11c, and 11d test areas will be expanded to include the areas within this isopleth. · The FFACO URs will all be located within the large Contamination Area (CA) that encompasses Plutonium Valley. Because access to the CA is limited and entry into the CA for post-closure inspections and maintenance would be impractical, UR warning signs will be posted along the existing CA fence. In accordance with the Soils Risk-Based Corrective Action Evaluation Process (NNSA/NSO, 2012b), an administrative UR will be implemented as a best management practice for the areas where the TED exceeds 25 millirems per Industrial Area year. This limit is based on continuous industrial use of the site and addresses exposure to industrial workers who would regularly be assigned to the work area for an entire career (250 days

none,

2013-04-30T23:59:59.000Z

271

Characterization plan for the Oak Ridge National Laboratory Area-Wide Groundwater Program, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This characterization plan has been developed as part of the U.S. Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the characterization plan is intended to serve as a strategy document to guide subsequent GWOU remedial investigations. The plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It is important to note that the characterization plan for the ORNL GWOU is not a prototypical work plan. As such, remedial investigations will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This characterization plan outlines the overall strategy for the remedial investigations and defines tasks that are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.

Not Available

1994-08-01T23:59:59.000Z

272

Smart Parking on Campus  

E-Print Network [OSTI]

Anxiety Because parking without a permit is often difficult,students apply for a permit even if they don’t intend topriority for campus permits. ” A student’s chance of

Shoup, Donald C

2007-01-01T23:59:59.000Z

273

Strategic Energy Planning (Area 1) Consultants Reports to Citizen Potawatomi Nation Federally Recognized Indian Tribe  

SciTech Connect (OSTI)

The assets that Citizen Potawatomi Nation holds were evaluated to help define the strengths and weaknesses to be used in pursuing economic prosperity. With this baseline assessment, a Planning Team will create a vision for the tribe to integrate into long-term energy and business strategies. Identification of energy efficiency devices, systems and technologies was made, and an estimation of cost benefits of the more promising ideas is submitted for possible inclusion into the final energy plan. Multiple energy resources and sources were identified and their attributes were assessed to determine the appropriateness of each. Methods of saving energy were evaluated and reported on and potential revenue-generating sources that specifically fit the tribe were identified and reported. A primary goal is to create long-term energy strategies to explore development of tribal utility options and analyze renewable energy and energy efficiency options. Associated goals are to consider exploring energy efficiency and renewable economic development projects involving the following topics: (1) Home-scale projects may include construction of a home with energy efficiency or renewable energy features and retrofitting an existing home to add energy efficiency or renewable energy features. (2) Community-scale projects may include medium to large scale energy efficiency building construction, retrofit project, or installation of community renewable energy systems. (3) Small business development may include the creation of a tribal enterprise that would manufacture and distribute solar and wind powered equipment for ranches and farms or create a contracting business to include energy efficiency and renewable retrofits such as geothermal heat pumps. (4) Commercial-scale energy projects may include at a larger scale, the formation of a tribal utility formed to sell power to the commercial grid, or to transmit and distribute power throughout the tribal community, or hydrogen production, and propane and natural-gas distribution systems.

Smith, Marvin; Bose, James; Beier, Richard; Chang, Young Bae

2004-12-01T23:59:59.000Z

274

Elevation of surficial sediment/basalt contact in the Subsurface Disposal Area, Idaho National Engineering Laboratory  

SciTech Connect (OSTI)

The elevation of the surficial sediment/basalt contact at the Subsurface Disposal Area (SDA), within the Radioactive Waste Management Complex (RWMC) is presented to provide a data base for future remedial actions at this site. About 1,300 elevation data from published and unpublished reports, maps, and surveyors notes were compiled to generate maps and cross-sections of the surficial sediment/basalt contact. In general, an east to west trending depression exists in the south central portion of the SDA with basalt closer to land surface on the northern and southern boundaries of the SDA. The lowest elevation of the surficial sediment/basalt contact is 4,979 ft and the greatest is land surface at 5,012 ft. The median elevation of the sediment/basalt interface is 4,994 ft. The median depth to basalt in the SDA is 16 ft if land surface elevation is assumed to be 5,010 ft. The depth from land surface to the sediment/basalt interface ranges from 24 ft in the southeast corner of the SDA to less than 3 ft at the north-central boundary of the SDA.

Hubbell, J.M.

1993-05-13T23:59:59.000Z

275

Parks Township Shallow Land Disposal Area  

E-Print Network [OSTI]

of the trenches will also be removed. Uranium, thorium, americium and plutonium contaminated waste has been- ment. Americium and plutonium, whose presence is attributed to storage of equipment used

US Army Corps of Engineers

276

Area Science Park | Open Energy Information  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home5b9fcbce19 NoPublic Utilities Address: 160 East 300AlgoilEnergy InformationArcata, California:Ardmore,

277

CCCP CEBAF Laydown Area Construction Parking  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth7-1D: Vegetation Proposed New Substation Sites Proposed Route Segments (notCAMDL20-000'IUDeputyof CCCCACCCP

278

RCRA Facility investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This report provides a detailed summary of the activities carried out to sample groundwater at Waste Area Grouping (WAG) 6. The analytical results for samples collected during Phase 1, Activity 2 of the WAG 6 Resource Conservation and Recovery Act Facility Investigation (RFI) are also presented. In addition, analytical results for Phase 1, activity sampling events for which data were not previously reported are included in this TM. A summary of the groundwater sampling activities of WAG 6, to date, are given in the Introduction. The Methodology section describes the sampling procedures and analytical parameters. Six attachments are included. Attachments 1 and 2 provide analytical results for selected RFI groundwater samples and ORNL sampling event. Attachment 3 provides a summary of the contaminants detected in each well sampled for all sampling events conducted at WAG 6. Bechtel National Inc. (BNI)/IT Corporation Contract Laboratory (IT) RFI analytical methods and detection limits are given in Attachment 4. Attachment 5 provides the Oak Ridge National Laboratory (ORNL)/Analytical Chemistry Division (ACD) analytical methods and detection limits and Resource Conservation and Recovery Act (RCRA) quarterly compliance monitoring (1988--1989). Attachment 6 provides ORNL/ACD groundwater analytical methods and detection limits (for the 1990 RCRA semi-annual compliance monitoring).

Not Available

1991-09-01T23:59:59.000Z

279

An evaluation of the social meanings of the boundary park: implications for municipal planning and race relations  

E-Print Network [OSTI]

This thesis examines the boundary park hypothesis, which posits that municipal governments tend not to distribute resources to maintain or upgrade parks that separate two distinct racial groups in a geographic area. It examines the effects of socio...

Aguirre, Carlos Agustin

2012-06-07T23:59:59.000Z

280

Radiological survey results at Porter Street City Park, Beverly, Massachusetts (VB026)  

SciTech Connect (OSTI)

At the request of the US Department of Energy (DOE), a team from Oak Ridge National Laboratory conducted a radiological survey at the Porter Street City Park, Beverly, Massachusetts. The survey was performed in May 1991. The purpose of the survey was to determine if uranium from work performed under government contract at the former Ventron facility had migrated off-site to neighboring areas. The survey included a surface gamma scan and the collection of soil samples for radionuclide analyses. Results of the survey demonstrated no radionuclide concentrations or radiation measurements in excess of the DOE Formerly Utilized Sites Remedial Action Program guidelines

Foley, R.D.; Johnson, C.A.

1992-08-01T23:59:59.000Z

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


281

The Access Almanac: Solar Parking Requirements  

E-Print Network [OSTI]

these requirements. Solar panels in parking lots will startto install solar panels on their parking lots the option tosupport solar panels. Therefore, parking lots will generate

Shoup, Donald

2012-01-01T23:59:59.000Z

282

Screening of contaminants in Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect (OSTI)

Waste Area Grouping 2 (WAG 2) of the Oak Ridge National Laboratory (ORNL) is located in the White Oak Creek Watershed and is composed of White Oak Creek Embayment, White Oak Lake and associated floodplain, and portions of White Oak Creek (WOC) and Melton Branch downstream of ORNL facilities. Contaminants leaving other ORNL WAGs in the WOC watershed pass through WAG 2 before entering the Clinch River. Health and ecological risk screening analyses were conducted on contaminants in WAG 2 to determine which contaminants were of concern and would require immediate consideration for remedial action and which contaminants could be assigned a low priority or further study. For screening purposes, WAG 2 was divided into four geographic reaches: Reach 1, a portion of WOC; Reach 2, Melton Branch; Reach 3, White Oak Lake and the floodplain area to the weirs on WOC and Melton Branch; and Reach 4, the White Oak Creek Embayment, for which an independent screening analysis has been completed. Screening analyses were conducted using data bases compiled from existing data on carcinogenic and noncarcinogenic contaminants, which included organics, inorganics, and radionuclides. Contaminants for which at least one ample had a concentration above the level of detection were placed in a detectable contaminants data base. Those contaminants for which all samples were below the level of detection were placed in a nondetectable contaminants data base.

Blaylock, B.G.; Frank, M.L.; Hoffman, F.O.; Hook, L.A.; Suter, G.W.; Watts, J.A.

1992-07-01T23:59:59.000Z

283

SCIENTIFIC INFORMATION FOR MARINE PROTECTED AREAS IN THE UNION OF COMOROS.  

E-Print Network [OSTI]

biodiversity. In the Comoros island of Moheli, a National Marine Park, was established in April 2001, by

unknown authors

284

A permit is required for ALL motorized vehicles parking on the Vanderbilt University Campus. Motorcycles, motorized bicycles, motor scooters and mopeds are  

E-Print Network [OSTI]

. Motorcycles, motorized bicycles, motor scooters and mopeds are required to display "U" permits. The cost. Motorcycle, motorized bicycle, motor scooter and moped parking areas can be found on the parking map (http://www.vanderbilt.edu/parking and click on "Maps") as designated by the motorcycle symbols. Parking is authorized only in spaces marked

Simaan, Nabil

285

Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. This site is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for the CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The site will be investigated based on the data quality objectives (DQOs) developed on July 6, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for the Baneberry site. The primary release associated with Corrective Action Unit 365 was radiological contamination from the Baneberry nuclear test. Baneberry was an underground weapons-related test that vented significant quantities of radioactive gases from a fissure located in close proximity to ground zero. A crater formed shortly after detonation, which stemmed part of the flow from the fissure. The scope of this investigation includes surface and shallow subsurface (less than 15 feet below ground surface) soils. Radionuclides from the Baneberry test with the potential to impact groundwater are included within the Underground Test Area Subproject. Investigations and corrective actions associated with the Underground Test Area Subproject include the radiological inventory resulting from the Baneberry test.

Patrick Matthews

2010-12-01T23:59:59.000Z

286

Fruit and Spice Park Park n r a n  

E-Print Network [OSTI]

1 Fruit and Spice Park Park n r a n 24801 S.W. 187th Avenue Homestead, Florida 33031 Main: 305 with disa ili es. Tr pical Fruit & Vegetable S ciety the Redland The Tropical Fruit & Vegeta le Societ of the Redland is a non-pro t group formed to promote exo c fruits and the Miami- ade Count Fruit & Spice Park

Koptur, Suzanne

287

Hawaii hydrogen power park Hawaii Hydrogen Power Park  

E-Print Network [OSTI]

. (Barrier R ­ Cost) Generate public interest & support. (Barrier S­Siting) #12;Hawaii hydrogen power park H Electrolyzer ValveManifold Water High Pressure H2 Storage Fuel Cell AC Power H2 Compressor Hydrogen Supply O2Hawaii hydrogen power park H Hawaii Hydrogen Power Park 2003 Hydrogen & Fuel Cells Merit Review

288

Carbon Park Environmental Impact Assessment  

E-Print Network [OSTI]

of offsetting the University's carbon footprint, promoting biodiversity and establishing easily maintained Carbon Park Environmental Impact Assessment A B.E.S.T. Project By, Adam Bond 2011 #12; Bishop's University Carbon Park

289

DOE - Office of Legacy Management -- U S Steel Co National Tube...  

Office of Legacy Management (LM)

CO., NATIONAL TUBE DIV., CHRISTY PARK WORKS PA.35-1 - NLO Trip Report; Halcomb to Quigley; Subject: Trip Report to National Tube Division, Christy Park Works, McKeesport,...

290

Closure Report for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 104 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management. CAU 104 consists of the following 15 Corrective Action Sites (CASs), located in Area 7 of the Nevada National Security Site: · CAS 07-23-03, Atmospheric Test Site T-7C · CAS 07-23-04, Atmospheric Test Site T7-1 · CAS 07-23-05, Atmospheric Test Site · CAS 07-23-06, Atmospheric Test Site T7-5a · CAS 07-23-07, Atmospheric Test Site - Dog (T-S) · CAS 07-23-08, Atmospheric Test Site - Baker (T-S) · CAS 07-23-09, Atmospheric Test Site - Charlie (T-S) · CAS 07-23-10, Atmospheric Test Site - Dixie · CAS 07-23-11, Atmospheric Test Site - Dixie · CAS 07-23-12, Atmospheric Test Site - Charlie (Bus) · CAS 07-23-13, Atmospheric Test Site - Baker (Buster) · CAS 07-23-14, Atmospheric Test Site - Ruth · CAS 07-23-15, Atmospheric Test Site T7-4 · CAS 07-23-16, Atmospheric Test Site B7-b · CAS 07-23-17, Atmospheric Test Site - Climax Closure activities began in October 2012 and were completed in April 2013. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan for CAU 104. The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste, mixed waste, and recyclable material. Some wastes exceeded land disposal limits and required treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite landfills. The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NFO for closure of CAU 104 · The transfer of CAU 104 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO

none,

2013-06-27T23:59:59.000Z

291

Golden Gate Park Marina Blvd.  

E-Print Network [OSTI]

St. Eureka S.VanNessAve. M arket St. Broadway St. To Golden Gate Bridge H ow ard St. Folsom St. Bryant St. 10 North / Golden Gate Bridge 2. Exit I­280 North toward Downtown San Francisco 3. Exit Mariposa St. toward80 280 Presidio Golden Gate Park Lincoln Park Buena Vista Park 101 101 101 101 1 1 Marina Blvd. Bay

Derisi, Joseph

292

Stag Hill Campus Manor Park,  

E-Print Network [OSTI]

­44) UNIVERSITY COURT (45­66) SCS HC Yorkie's Bridge Rising Barrier Path to Ridgemount MILLENNIUMHOUSE SE AQA Car Park AQA Car Park PM Barrier Entrance Exit IAC LLC SenateCarPark Guildford Railway Station Pedestrians R Chancellors SU Mole 23 W Bourne 22 Black Water 21 Wey 27 Thames 24 Wandle 26Tilling Bourne 25

Doran, Simon J.

293

National Park Service Exotic Plant Management Teams  

E-Print Network [OSTI]

including air and water quality monitoring · Improve resource planning · Increase collaboration Supply Touch Screen Laptops (networked) Software & Imagery #12;#12;DASM Methods ·East-west transects on 1 On Foot Helicopter Airboat Boat Off Road Vehicle Pack Animals #12;Treatment Methods Heavy Equipment Hand

Watson, Craig A.

294

Sandia National Laboratories: Sandia Science & Technology Park...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

and Exhibition (EU PVSC) EC Top Publications Reference Model 5 (RM5): Oscillating Surge Wave Energy Converter Experimental Wave Tank Test for Reference Model 3 Floating- Point...

295

Sustainable Transportation and National Parks Initiative Featured...  

Office of Environmental Management (EM)

and performance while reducing costs. Research and development is helping create biofuels indistinguishable from conventional petroleum-based fuels. Research, development, and...

296

Publications | Savannah River National Environmental Park  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromising Science for PlutoniumAboutAboutPublicationsSavannah River

297

Research | Savannah River National Environmental Park  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar HomePromisingStories »Submitter A B C D E F G HResearch The SRS's

298

NERPs Definition | Savannah River National Environmental Park  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Regionat Cornell Batteries & FuelTechnologies |T I O N A L S E C

299

Biodiversity | Savannah River National Environmental Park  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsruc DocumentationP-Series to someone6 M. Babzien, I.ProgramBig Sol BigNatural Resources and

300

New Directions for the National Park System  

E-Print Network [OSTI]

HeinOnline -- 25 U. Kan. L. Rev. 477 1976-1977 HeinOnline -- 25 U. Kan. L. Rev. 478 1976-1977 HeinOnline -- 25 U. Kan. L. Rev. 479 1976-1977 HeinOnline -- 25 U. Kan. L. Rev. 480 1976-1977 HeinOnline -- 25 U. Kan. L. Rev. 481 1976-1977 Hein...Online -- 25 U. Kan. L. Rev. 482 1976-1977 HeinOnline -- 25 U. Kan. L. Rev. 483 1976-1977 HeinOnline -- 25 U. Kan. L. Rev. 484 1976-1977 HeinOnline -- 25 U. Kan. L. Rev. 485 1976-1977 HeinOnline -- 25 U. Kan. L. Rev. 486 1976-1977 HeinOnline -- 25 U. Kan. L...

Coggins, George Cameron

1976-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


301

RCRA Facility Investigation report for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 3, Appendixes 1 through 8: Environmental Restoration Program  

SciTech Connect (OSTI)

This report presents compiled information concerning a facility investigation of waste area group 6(WAG-6), of the solid waste management units (SWMU`S) at Oak Ridge National Laboratory (ORNL). The WAG is a shallow ground disposal area for low-level radioactive wastes and chemical wastes. The report contains information on hydrogeological data, contaminant characterization, radionuclide concentrations, risk assessment from doses to humans and animals and associated cancer risks, exposure via food chains, and historical data. (CBS)

Not Available

1991-09-01T23:59:59.000Z

302

Constructing use in surface parking lots : strategies for enhancing lots as part-time public spaces  

E-Print Network [OSTI]

Surface parking lots occupy vast amounts of land in urbanized areas-at times covering up to 40% of land in downtown areas in the United States. It is estimated that there are seven parking spaces for every vehicle in the ...

Ziegenfuss, Kathleen Kane

2009-01-01T23:59:59.000Z

303

Special Analysis of the Area 3 Radioactive Waste Management Site at the Nevada National Security Site, Nye County, Nevada  

SciTech Connect (OSTI)

This report describes the methods and results of a special analysis (SA) of the Area 3 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). The purpose of the SA is to determine if the approved performance assessment (PA) and composite analysis (CA) (Shott et al., 2001) remain valid. The Area 3 RWMS PA and CA were prepared as a single document and received conditional approval on October 6, 1999. A conditional Disposal Authorization Statement (DAS) for the Area 3 RWMS was issued on October 20, 1999. Since preparation of the approved PA and CA, new information and additional environmental monitoring data have been used to update the PA and CA. At the same time, continual advancements in computer processors and software have allowed improvement to the PA and CA models. Annual reviews of the PA and CA required by U.S. Department of Energy (DOE) Order DOE O 435.1 have documented multiple changes occurring since preparation of the PA and CA. Potentially important changes include: Development of a new and improved baseline PA and CA model implemented in the probabilistic GoldSim simulation platform. A significant increase in the waste inventory disposed at the site. Revision and updating of model parameters based on additional years of site monitoring data and new research and development results. Although changes have occurred, many important PA/CA issues remain unchanged, including the site conceptual model, important features, events, and processes, and the points of compliance. The SA is performed to document the current status of the PA/CA model and to quantitatively assess the impact of cumulative changes on the PA and CA results. The results of the SA are used to assess the validity of the approved PA/CA and make a determination if revision of the PA or CA is necessary. The SA was performed using the Area 3 RWMS, version 2.102, GoldSim model, the current baseline PA/CA model. Comparison of the maximum SA results with the PA performance objectives indicates that there continues to be a reasonable expectation of compliance. The resident exposure scenario was evaluated for compliance with the air pathway and all-pathways annual total effective dose (TED) performance objectives. The maximum mean air pathway TED, 7E-6 millisievert (mSv) at 1,000 years (y) has decreased relative to the approved PA and is significantly less than the 0.1 mSv limit. The maximum mean all-pathways annual TED, 7E-5 mSv at 1,000 y has increased but remains a small fraction of the 0.25 mSv limit. The SA maximum mean radon-222 (222Rn) flux density, 0.03 becquerel per square meter per second (Bq m-2 s-1), has increased relative to the PA results but is significantly less than the 0.74 Bq m-2 s-1 limit. The SA results continue to support a conclusion that the disposed waste inventory is protective of intruders and groundwater resources. The maximum mean intruder TED, 0.01 mSv for an acute construction scenario at the U-3ah/at disposal unit, was less than the 5 mSv performance measure. Site monitoring data and research results continue to support a conclusion that a groundwater pathway will not exist within the 1,000 y compliance period. Projected releases to the environment are a small fraction of the performance objectives. Cost-effective options for reducing releases further are unlikely to exist. Therefore, releases from the Area 3 RWMS are judged to be as low as reasonably achievable. Comparison of the maximum CA result with the 0.3 mSv CA dose constraint indicates that no action is required to reduce the dose from the Area 3 RWMS and all interacting sources of residual radioactive contamination. The SA maximum mean CA annual TED, 0.02 mSv at 1,000 y, has increased from the approved CA result but remains less than 10% of the dose constraint. The CA TED continues to be due predominantly to inhalation of plutonium-239 resuspended from soils contaminated by nuclear weapons tests conducted near the Area 3 RWMS. The SA results estimated with the Area 3 RWMS version 2.102 model indicate that changes to the PA and CA do not

National Security Technologies, LLC, Environmental Management

2012-09-30T23:59:59.000Z

304

Corrective Action Investigation Plan for Corrective Action Unit 550: Smoky Contamination Area Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 550 is located in Areas 7, 8, and 10 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 550, Smoky Contamination Area, comprises 19 corrective action sites (CASs). Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plumes, it was determined that some of the CAS releases are co-located and will be investigated as study groups. This document describes the planned investigation of the following CASs (by study group): (1) Study Group 1, Atmospheric Test - CAS 08-23-04, Atmospheric Test Site T-2C; (2) Study Group 2, Safety Experiments - CAS 08-23-03, Atmospheric Test Site T-8B - CAS 08-23-06, Atmospheric Test Site T-8A - CAS 08-23-07, Atmospheric Test Site T-8C; (3) Study Group 3, Washes - Potential stormwater migration of contaminants from CASs; (4) Study Group 4, Debris - CAS 08-01-01, Storage Tank - CAS 08-22-05, Drum - CAS 08-22-07, Drum - CAS 08-22-08, Drums (3) - CAS 08-22-09, Drum - CAS 08-24-03, Battery - CAS 08-24-04, Battery - CAS 08-24-07, Batteries (3) - CAS 08-24-08, Batteries (3) - CAS 08-26-01, Lead Bricks (200) - CAS 10-22-17, Buckets (3) - CAS 10-22-18, Gas Block/Drum - CAS 10-22-19, Drum; Stains - CAS 10-22-20, Drum - CAS 10-24-10, Battery. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each study group. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 31, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 550. The potential contamination sources associated with the study groups are from nuclear testing activities conducted at CAU 550. The DQO process resulted in an assumption that the total effective dose (TED) within the default contamination boundary of CAU 550 exceeds the final action level and requires corrective action. The presence and nature of contamination outside the default contamination boundary at CAU 550 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the TED at sample locations to the dose-based final action level. The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each group of CASs.

Grant Evenson

2012-05-01T23:59:59.000Z

305

Idaho National Engineering Laboratory Waste Area Groups 1-7 and 10 Technology Logic Diagram. Volume 3  

SciTech Connect (OSTI)

The Idaho National Engineering Laboratory (INEL) Technology Logic Diagram (TLD) was developed to provide a decision support tool that relates Environmental Restoration (ER) and Waste Management (WM) problems at the INEL to potential technologies that can remediate these problems. The TLD identifies the research, development, demonstration, testing, and evaluation needed to develop these technologies to a state that allows technology transfer and application to an environmental restoration need. It is essential that follow-on engineering and system studies be conducted to build on the output of this project. These studies will begin by selecting the most promising technologies identified in this TLD and finding an optimum mix of technologies that will provide a socially acceptable balance between cost and risk to meet the site windows of opportunity. The TLD consists of three separate volumes: Volume I includes the purpose and scope of the TLD, a brief history of the INEL Waste Area Groups, and environmental problems they represent. A description of the TLD, definitions of terms, a description of the technology evaluation process, and a summary of each subelement, is presented. Volume II describes the overall layout and development of the TLD in logic diagram format. This section addresses the environmental restoration of contaminated INEL sites. Volume III (this volume) provides the Technology Evaluation Data Sheets (TEDS) for Environmental Restoration and Waste Management (EM) activities that are reference by a TEDS code number in Volume II. Each of these sheets represents a single logic trace across the TLD. These sheets contain more detail than provided for technologies in Volume II. Data sheets are arranged alphanumerically by the TEDS code number in the upper right corner of each sheet.

O`Brien, M.C.; Meservey, R.H.; Little, M.; Ferguson, J.S.; Gilmore, M.C.

1993-09-01T23:59:59.000Z

306

2013 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada; Review of the Performance Assessments and Composite Analyses  

SciTech Connect (OSTI)

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2013 • Evaluation of new or revised waste streams by special analysis • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2013 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2013 PA results, generated with the Area 5 RWMS v4.115 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2013. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (Corrective Action Unit [CAU] 97) source term, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan in FY 2015. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 Closure Report in FY 2015. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMS.

Shott, Gregory [NSTec] [NSTec

2014-03-01T23:59:59.000Z

307

What can I do with this degree? AREAS EMPLOYERS  

E-Print Network [OSTI]

Natural Resource Management Recreation Management Center of Special Facility Management Program Management Business Management City, county or regional government agencies including parks and public recreation including parks, forests, wildlife areas and water resources Department of Defense military bases in U

Escher, Christine

308

PEABODY PARK TAYLOR GARDEN  

E-Print Network [OSTI]

BOOTH BELL TOWER ·MAP BY RBS- GPS/GIS PROJECT MANAGER Trail Golf Course Loop- 1.0 Mi. Lori's Long Walk-2.1 Mi Lori's Short Walk-1.7 Mi NorthDriveLoop -.85 Mi Peabody Park Walk- .70 Mi. TheQuadLoop- .75 Mi WestDriveLoop -1.05 Mi 1 inch = 150 feet #12;

Saidak, Filip

309

Equilibrium analysis in the parking search game with heuristic strategies  

E-Print Network [OSTI]

smart city environments, admittedly, can be proved to be a very complicated task. On one side the congestion phenomena in city areas. In this paper, we model drivers' decision-making with respect in city areas caused by the circulation of large numbers of vehicles in search for available parking space

Stavrakakis, Ioannis

310

UNIVERSITY of HOUSTON Parking and Transportation Services  

E-Print Network [OSTI]

UNIVERSITY of HOUSTON Parking and Transportation Services Proposed FY14 and FY15 Parking Rates March ­ April Auxiliary Services Parking and Transportation Shared Governance Committee - Transportation of University of Houston parking and transportation programs. 2. To improve and maintain parking infrastructure

Bittner, Eric R.

311

Bexar County Parking Garage Photovoltaic Panels  

SciTech Connect (OSTI)

The main objective of the Bexar County Parking Garage Photovoltaic (PV) Panel project is to install a PV System that will promote the use of renewable energy. This project will also help sustain Bexar County ongoing greenhouse gas emissions reduction and energy efficiency goals. The scope of this project includes the installation of a 100-kW system on the top level of a new 236,285 square feet parking garage. The PV system consists of 420 solar panels that covers 7,200 square feet and is tied into the electric-grid. It provides electricity to the office area located within the garage. The estimated annual electricity production of the PV system is 147,000 kWh per year.

Golda Weir

2012-01-23T23:59:59.000Z

312

EA-0969: Low Energy Accelerator Laboratory Technical Area 53 Los Alamos National Laboratory, Los Alamos, New Mexico  

Broader source: Energy.gov [DOE]

This EA evaluates the environmental impacts of the U.S. Department of Energy's Los Alamos National Laboratory in Los Alamos, New Mexico to construct and operate a small research and development...

313

Use of Management and Operating Contractor and National Laboratory Employees for Services in the D.C. Area  

Broader source: Directives, Delegations, and Requirements [Office of Management (MA)]

This Notice provides requirements for Headquarters use of employees from Management and Operating (M&O) contractors and National Laboratories and establishes limitations on payments to those employees whose assignments to Headquarters exceed 365 days.

1997-03-05T23:59:59.000Z

314

College of Communication & Information 1345 Circle Park Drive | Suite 302  

E-Print Network [OSTI]

College of Communication & Information 1345 Circle Park Drive | Suite 302 Knoxville, TN 37996 & Communication Studies (CICS) - Awarded grants total $7 million +, NSF, IMLS, Sloan Foundation and more - 2.5+ million in science information and communication contract work at Oak Ridge National Labs. · Hands

Grissino-Mayer, Henri D.

315

Designing for ecology : the ecological park  

E-Print Network [OSTI]

This thesis aims to define a) what an ecological park is, and b) whether it is a new model in park design. Reference to the literature on landscape ecology is used to analyze the natural ecological merit of these parks, ...

Power, Andres M

2006-01-01T23:59:59.000Z

316

National Park Service Statue of Liberty National Monument | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy HealthCommentsAugust 2012NEVADAEnergyEnergy

317

Parking Services Rules and Regulations  

E-Print Network [OSTI]

: Violations and Associated Fines 16 #12;Bowling Green State University Parking Services Parking Rules by Bowling Green State University. 1.2 The Manager will exercise discretion and authority in a manner, and the benefit and maximum convenience of visitors, students, and employees on the Bowling Green State University

Moore, Paul A.

318

Department of Parks, Recreation, and Tourism  

E-Print Network [OSTI]

Department of Parks, Recreation, and Tourism Therapeutic Recreation #12;3 Department of Parks, Recreation, and Tourism (PRT) Cooperative Education I & II

Tipple, Brett

319

LANL: CPO: Los Alamos National Laboratory Impacts and Investments...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Veterinary Hospital * Santa Cruz Farm * Secure Logistics, LLC * Sky Mountain Resort RV Park, LLC Community Giving Los Alamos National Laboratory is committed to giving back to...

320

Final Environmental Impact Statement for the Proposed Relocation of Technical Area 18 Capabilities and Materials at the Los Alamos National Laboratory  

SciTech Connect (OSTI)

The National Nuclear Security Administration, a separately organized agency within DOE, is responsible for providing the Nation with nuclear weapons, ensuring the safety and reliability of those nuclear weapons, and supporting programs that reduce global nuclear proliferation. These missions are accomplished with a core team of highly trained nuclear experts. One of the major training facilities for these personnel is located at Technical Area 18 (TA-18), within the Los Alamos National Laboratory (LANL), Los Alamos, New Mexico. Principal TA-18 operational activities involve research in and the design, development, construction, and application of experiments on nuclear criticality. Though TA-18 is judged to be secure by DOE's independent inspection office, its buildings and infrastructure are from 30 to more than 50 years old and are increasingly expensive to maintain and operate. Additionally, the TA-18 operations are located in a relatively isolated area, resulting in increasingly high costs to maintain a security Category I infrastructure. NNSA wishes to maintain the important capabilities currently provided at TA-18 in a manner that reduces the long-term costs for safeguards and security. NNSA proposes to accomplish this by relocating the TA-18 security Category I/II capabilities and materials to new locations. The TA-18 Relocation EIS evaluates the potential direct, indirect, and cumulative environmental impacts associated with this proposed action at the following DOE sites: (1) a different site at LANL at Los Alamos, New Mexico; (2) the Sandia National Laboratories/New Mexico at Albuquerque, New Mexico; (3) the Nevada Test Site near Las Vegas, Nevada (the Preferred Alternative); and (4) the Argonne National Laboratory-West near Idaho Falls, Idaho. The EIS also analyzes the alternatives of upgrading the existing TA-18 facilities and the No Action Alternative of maintaining the operations at the current TA-18 location.

N /A

2002-09-20T23:59:59.000Z

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


321

A New "Smart Parking" System Based on Optimal Resource Allocation and Reservations  

E-Print Network [OSTI]

, it is estimated that 30% of vehicles on the road in the downtown area of major cities are cruising for a parking and fuel for drivers looking for parking, but it also contributes to additional waste of time and fuel be disseminated through the Internet [1], [9], [15]. PGI systems are based on the development of autonomous

Cassandras, Christos G.

322

Dynamic Resource Allocation in Urban Settings: A "Smart Parking" Yanfeng Geng and Christos G. Cassandras  

E-Print Network [OSTI]

) system is based on the development of autonomous vehicle detection and parking spot monitoring, typically in urban settings. On a daily basis, it is estimated that 30% of vehicles on the road in the downtown area]. This causes not only a waste of time and fuel for drivers looking for parking, but it also contributes

Cassandras, Christos G.

323

2012 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses  

SciTech Connect (OSTI)

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: ? Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA ? Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012 ? Evaluation of new or revised waste streams by special analysis ? Development of version 4.114 of the Area 5 RWMS GoldSim PA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term R&D efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.

Shott, G. [National Security Technologies, LLC

2013-03-18T23:59:59.000Z

324

2011 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses  

SciTech Connect (OSTI)

The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC, 2007a) requires an annual review to assess the adequacy of the Performance Assessments (PAs) and Composite Analyses (CAs), with the results submitted annually to U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part of the maintenance plan (DOE, 1999a; 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2011. This annual summary report presents data and conclusions from the FY 2011 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R and D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) (formerly the Nevada Test Site) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R and D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2011 include the following: (1) Operation of a new shallow land disposal unit and a new Resource Conservation and Recovery Act (RCRA)-compliant lined disposal unit at the Area 5 RWMS; (2) Development of new closure inventory estimates based on disposals through FY 2011; (3) Evaluation of new or revised waste streams by special analysis; (4) Development of version 2.102 of the Area 3 RWMS GoldSim PA model; and (5) Development of version 4.113 of the Area 5 RWMS GoldSim PA model. Analysis of the latest available data using the Area 5 RWMS v4.113 GoldSim PA model indicates that all performance objectives can be met. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. In FY 2011, there were no operational changes, monitoring results, or R and D results for the Area 3 RWMS that would impact PA validity. Despite the increase in waste volume and inventory at the Area 3 RWMS since 1996 when the PA was approved, the facility performance evaluated with the Area 3 RWMS PA GoldSim model, version 2.0 (with the final closure inventory), remains well below the performance objectives set forth in U.S. Department of Energy Order DOE O 435.1, 'Radioactive Waste Management' (DOE, 2001). The conclusions of the Area 3 RWMS PA remain valid. A special analysis was prepared to update the PA and CA results for the Area 3 RWMS in FY 2011. Release of the special analysis is planned for FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. Inclusion of the Frenchman Flat Underground Test Area (UGTA) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the closure report for the Frenchman Flat UGTA corrective action unit (CAU) in FY 2015. An industrial site, CAU 547, with corrective action sites near the Area 3 RWMS was found to have a significant plutonium inventory in 2009. CAU 547 will be evaluated for inclusion of future revisions or updates of the Area 3 RWMS CA. The revision of the Area 3 RWMS CA, which will include the UGTA source terms, is expected in FY 2024, following the completion of the Yucca Flat CAU Corrective Action Decision Document, scheduled for FY 2023. Near-term R and D efforts will focus on continuing development of the Are

NSTec Environmental Management

2012-03-20T23:59:59.000Z

325

Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.

NSTec Environmental Restoration

2010-11-22T23:59:59.000Z

326

Special Analysis for the Disposal of the Idaho National Laboratory Unirradiated Light Water Breeder Reactor Rods and Pellets Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada  

SciTech Connect (OSTI)

The purpose of this special analysis (SA) is to determine if the Idaho National Laboratory (INL) Unirradiated Light Water Breeder Reactor (LWBR) Rods and Pellets waste stream (INEL103597TR2, Revision 2) is suitable for disposal by shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS). The INL Unirradiated LWBR Rods and Pellets waste stream consists of 24 containers with unirradiated fabricated rods and pellets composed of uranium oxide (UO2) and thorium oxide (ThO2) fuel in zirconium cladding. The INL Unirradiated LWBR Rods and Pellets waste stream requires an SA because the 229Th, 230Th, 232U, 233U, and 234U activity concentrations exceed the Nevada National Security Site (NNSS) Waste Acceptance Criteria (WAC) Action Levels.

Shott, Gregory [NSTec

2014-08-31T23:59:59.000Z

327

Parking Options 2011/12 Reserved Permits  

E-Print Network [OSTI]

Parking Options 2011/12 Reserved Permits A Reserved permit is $275 this fiscal year and is only available to faculty and staff through payroll deduction. Individuals issued a Reserved permit may park is completely full someone is parked illegally and Parking Services should be notified. Reserved permit holders

328

White Oak Creek Watershed: Melton Valley Area Remedial Investigation Report, Oak Ridge National Laboratory, Oak Ridge, Tennessee: Volume 3 Appendix C  

SciTech Connect (OSTI)

This report provides details on the baseline ecological risk assessment conducted in support of the Remedial Investigation (RI) Report for the Melton Valley areas of the White Oak Creek watershed (WOCW). The RI presents an analysis meant to enable the US Department of Energy (DOE) to pursue a series of remedial actions resulting in site cleanup and stabilization. The ecological risk assessment builds off of the WOCW screening ecological risk assessment. All information available for contaminated sites under the jurisdiction of the US Department of Energy`s Comprehensive Environmental Response, Compensation, and Liability Act Federal Facilities Agreement within the White Oak Creek (WOC) RI area has been used to identify areas of potential concern with respect to the presence of contamination posing a potential risk to ecological receptors within the Melton Valley area of the White Oak Creek watershed. The risk assessment report evaluates the potential risks to receptors within each subbasin of the watershed as well as at a watershed-wide scale. The WOC system has been exposed to contaminant releases from Oak Ridge National Laboratory and associated operations since 1943 and continues to receive contaminants from adjacent waste area groupings.

NONE

1996-11-01T23:59:59.000Z

329

Criteria for Car Parking Allocation System Criteria for Car Parking Allocation System  

E-Print Network [OSTI]

. The sharing of car parking spaces is encouraged. It should be noted that both (or all) members of staffCriteria for Car Parking Allocation System Criteria for Car Parking Allocation System 2014-15 Criteria for Car Parking All #12;The issue and control of car parking permits is vested in Estates Services

Mottram, Nigel

330

Corrective Action Decision Document/Closure Report for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The purpose of the CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed.

Matthews, Patrick

2013-11-01T23:59:59.000Z

331

University of Minnesota UMore Park Sand and Gravel Resources  

E-Print Network [OSTI]

aggregate mines adjacent to and near the UMore Mining Area. An Environmental Impact Statement (EIS;UMore Park Sand and Gravel Resources Project ­ Final Scoping Decision Document University of Minnesota and Gravel Resources Project ­ Final Scoping Decision Document University of Minnesota, May 2009 Page 2

Netoff, Theoden

332

Thank you for purchasing a York University Parking Permit  

E-Print Network [OSTI]

84, determined at time of purchase, 24 hours daily. Motorcycle Allows you to park your motorcycle in any Unreserved Lot or designated motorcycle area, 24 hours daily. Day Unreserved/Evening Reserved in Reserved lots A-Lot 4 and B-Lot 5 from 4pm to 7:30am and 24 hours daily on weekends. Motorcycle Allows you

333

JOHNSON PARK RUTGERS GOLF COURSE  

E-Print Network [OSTI]

JOHNSON PARK RUTGERS GOLF COURSE MITCHELL AVE TOOLANST HOES LN MARIONCT HOES LN W GATES AVE RIVER McCormick Hall Richardson Apartments Russell Apartments Johnson Apartments Waksman Greenhouse Civil

Hanson, Stephen José

334

Sampling and analysis plan for the site characterization of the waste area Grouping 1 groundwater operable unit at Oak Ridge National Laboratory  

SciTech Connect (OSTI)

Waste Area Grouping (WAG) 1 at Oak Ridge National Laboratory (ORNL) includes all of the former ORNL radioisotope research, production, and maintenance facilities; former waste management areas; and some former administrative buildings. Site operations have contaminated groundwater, principally with radiological contamination. An extensive network of underground pipelines and utilities have contributed to the dispersal of contaminants to a known extent. In addition, karst geology, numerous spills, and pipeline leaks, together with the long and varied history of activities at specific facilities at ORNL, complicate contaminant migration-pathway analysis and source identification. To evaluate the extent of contamination, site characterization activity will include semiannual and annual groundwater sampling, as well as monthly water level measurements (both manual and continuous) at WAG 1. This sampling and analysis plan provides the methods and procedures to conduct site characterization for the Phase 1 Remedial Investigation of the WAG 1 Groundwater Operable Unit.

NONE

1994-11-01T23:59:59.000Z

335

Public Parking > Agriculture Building Parkade**  

E-Print Network [OSTI]

P P P P P P P P P P M M M 1 C 3 2 B A R O O 9 L 5 Y Q T U U 16 15 4 P 18 17 7 H Public Parking > Agriculture Building Parkade** > Pay Parking Lots** > Stadium Parkade** > Diefenbaker Lot > Health Sciences Lots Buildings Place Riel Student Centre - PH 306-966-6988 1 Campus Drive Royal University Hospital

Saskatchewan, University of

336

Intense Diagnostic Neutral Beam for ITER LANL-Park and Wurden Intense Diagnostic Neutral Beam for ITER  

E-Print Network [OSTI]

for ITER Jaeyoung Park and Glen A. Wurden Plasma Physics Group (P-24) Los Alamos National Laboratory LosIntense Diagnostic Neutral Beam for ITER LANL-Park and Wurden 2 Intense Diagnostic Neutral Beam Alamos, NM 87545 Executive Summary An intense pulsed diagnostic neutral beam (IDNB) is proposed to enable

337

National Ignition Facility subsystem design requirements laser {ampersand} target area building (LTAB) SSDR 1.2.2.1  

SciTech Connect (OSTI)

This Subsystem Design Requirements (SSDR) document establishes the performance, design, and verification requirements for the conventional building systems and subsystems of the Laser and Target Area Building (LTAB), including those that house and support the operation of high-energy laser equipment and the operational flow of personnel and materials throughout the facility. This SSDR addresses the following subsystems associated with the LTAB: Building structural systems for the Target Bay, Switchyards, Diagnostic Building, Decontamination Area, Laser Bays, Capacitor Bays and Operations Support Area, and the necessary space associated with building-support equipment; Architectural building features associated with housing the space and with the operational cleanliness of the functional operation of the facilities; Heating, Ventilating, and Air Conditioning (HVAC) systems for maintaining a clean and thermally stable ambient environment within the facilities; Plumbing systems that provide potable water and sanitary facilities for the occupants, plus stormwater drainage for transporting rainwater; Fire Protection systems that guard against fire damage to the facilities and their contents; Material handling systems for transporting personnel and heavy materials within the building areas; Mechanical process piping systems for liquids and gases that provide cooling and other service to experimental laser equipment and components; Electrical power and grounding systems that provide service and standby power to building and experimental equipment, including lighting distribution and communications systems for the facilities; Instrumentation and control systems that ensure the safe operation of conventional facilities systems, such as those listed above. Detailed requirements for building subsystems that are not addressed in this document (such as specific sizes, locations, or capacities) are included in detail-level NIP Project Interface Control Documents (ICDS).

Kempel, P.; Hands, J.

1996-08-19T23:59:59.000Z

338

Public Geology at Griffith Park in Los Angeles: A Sample Teachers’ Guide  

E-Print Network [OSTI]

http://www.geo.cornell.edu/geology/faculty/RWA/programs.htmlR. J. (1987). Quaternary geology and seismic hazard of the1953). Special Report 33: Geology of the Griffith Park area,

Helman, Daniel S

2012-01-01T23:59:59.000Z

339

Multinational underground nuclear parks  

SciTech Connect (OSTI)

Newcomer countries expected to develop new nuclear power programs by 2030 are being encouraged by the International Atomic Energy Agency to explore the use of shared facilities for spent fuel storage and geologic disposal. Multinational underground nuclear parks (M-UNPs) are an option for sharing such facilities. Newcomer countries with suitable bedrock conditions could volunteer to host M-UNPs. M-UNPs would include back-end fuel cycle facilities, in open or closed fuel cycle configurations, with sufficient capacity to enable M-UNP host countries to provide for-fee waste management services to partner countries, and to manage waste from the M-UNP power reactors. M-UNP potential advantages include: the option for decades of spent fuel storage; fuel-cycle policy flexibility; increased proliferation resistance; high margin of physical security against attack; and high margin of containment capability in the event of beyond-design-basis accidents, thereby reducing the risk of Fukushima-like radiological contamination of surface lands. A hypothetical M-UNP in crystalline rock with facilities for small modular reactors, spent fuel storage, reprocessing, and geologic disposal is described using a room-and-pillar reference-design cavern. Underground construction cost is judged tractable through use of modern excavation technology and careful site selection. (authors)

Myers, C.W. [Nuclear Engineering and Nonproliferation Division, Los Alamos National Laboratory, MS F650, Los Alamos, NM 87544 (United States); Giraud, K.M. [Wolf Creek Nuclear Operating Corporation, 1550 Oxen Lane NE, P.O. Box 411, Burlington, KS 66839-0411 (United States)

2013-07-01T23:59:59.000Z

340

Urban Parks: The Value of Small Urban Parks, Plazas and Other Outdoor Spaces  

E-Print Network [OSTI]

People need parks. Great urban parks are places where communities come together, people interact, and social capital develops. Learn the characteristics of great urban parks and how they are created....

Shafer, Carl Scott; Jacob, John

2006-11-27T23:59:59.000Z

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


341

Implementing waste minimization at an active plutonium processing facility: Successes and progress at technical area (TA) -55 of the Los Alamos National Laboratory  

SciTech Connect (OSTI)

The Los Alamos National Laboratory has ongoing national security missions that necessitate increased plutonium processing. The bulk of this activity occurs at Technical Area -55 (TA-55), the nations only operable plutonium facility. TA-55 has developed and demonstrated a number of technologies that significantly minimize waste generation in plutonium processing (supercritical CO{sub 2}, Mg(OH){sub 2} precipitation, supercritical H{sub 2}O oxidation, WAND), disposition of excess fissile materials (hydride-dehydride, electrolytic decontamination), disposition of historical waste inventories (salt distillation), and Decontamination & Decommissioning (D&D) of closed nuclear facilities (electrolytic decontamination). Furthermore, TA-55 is in the process of developing additional waste minimization technologies (molten salt oxidation, nitric acid recycle, americium extraction) that will significantly reduce ongoing waste generation rates and allow volume reduction of existing waste streams. Cost savings from reduction in waste volumes to be managed and disposed far exceed development and deployment costs in every case. Waste minimization is also important because it reduces occupational exposure to ionizing radiation, risks of transportation accidents, and transfer of burdens from current nuclear operations to future generations.

Balkey, J.J.; Robinson, M.A.; Boak, J.

1997-12-01T23:59:59.000Z

342

Corrective Action Investigation Plan for Corrective Action Unit 569: Area 3 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 569 is located in Area 3 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 569 comprises the nine numbered corrective action sites (CASs) and one newly identified site listed below: (1) 03-23-09, T-3 Contamination Area (hereafter referred to as Annie, Franklin, George, and Moth); (2) 03-23-10, T-3A Contamination Area (hereafter referred to as Harry and Hornet); (3) 03-23-11, T-3B Contamination Area (hereafter referred to as Fizeau); (4) 03-23-12, T-3S Contamination Area (hereafter referred to as Rio Arriba); (5) 03-23-13, T-3T Contamination Area (hereafter referred to as Catron); (6) 03-23-14, T-3V Contamination Area (hereafter referred to as Humboldt); (7) 03-23-15, S-3G Contamination Area (hereafter referred to as Coulomb-B); (8) 03-23-16, S-3H Contamination Area (hereafter referred to as Coulomb-A); (9) 03-23-21, Pike Contamination Area (hereafter referred to as Pike); and (10) Waste Consolidation Site 3A. Because CAU 569 is a complicated site containing many types of releases, it was agreed during the data quality objectives (DQO) process that these sites will be grouped. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each study group. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the DQOs developed on September 26, 2011, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 569. The presence and nature of contamination at CAU 569 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose (TED) at sample locations to the dose-based final action level (FAL). The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. A field investigation will be performed to define any areas where TED exceeds the FAL and to determine whether contaminants of concern are present at the site from other potential releases. The presence and nature of contamination from other types of releases (e.g., excavation, migration, and any potential releases discovered during the investigation) will be evaluated using soil samples collected from biased locations indicating the highest levels of contamination. Appendix A provides a detailed discussion of the DQO methodology and the objectives specific to each study group.

Patrick Matthews; Christy Sloop

2012-02-01T23:59:59.000Z

343

National Nuclear Security Administration  

Broader source: Energy.gov (indexed) [DOE]

and Related Structures within TA-3 at Los Alamos National Laboratory, Los Alamos, New Mexico U. S. Department of Energy National Nuclear Security Administration Los Alamos Area...

344

Oak Ridge Science and Technology Park | ornl.gov  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Economic Development | Oak Ridge Science and Technology Park SHARE Oak Ridge Science and Technology Park The Oak Ridge Science and Technology Park is ideal for companies that want...

345

Forrestal Garage Parking Procedures, Revised August 12, 2010  

Broader source: Energy.gov [DOE]

Forrestal Garage Parking Procedures - The Forrestal Facility Parking Guide was created to define policies and procedures governing the assignment, use, and management of parking spaces controlled...

346

Closure Report for Corrective Action Unit 366: Area 11 Plutonium Valley Dispersion Sites, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 366, Area 11 Plutonium Valley Dispersion Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 366 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended).

none,

2013-12-31T23:59:59.000Z

347

Closure Report for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks Nevada National Security Site, Nevada with ROTC-1, Revision 0  

SciTech Connect (OSTI)

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 539: Areas 25 and 26 Railroad Tracks, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 539 are located within Areas 25 and 26 of the Nevada National Security Site. Corrective Action Unit 539 comprises the following CASs: • 25-99-21, Area 25 Railroad Tracks • 26-99-05, Area 26 Railroad Tracks The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 539 were met. To achieve this, the following actions were performed: • Reviewed documentation on historical and current site conditions, including the concentration and extent of contamination. • Conducted radiological walkover surveys of railroad tracks in both Areas 25 and 26. • Collected ballast and soil samples and calculated internal dose estimates for radiological releases. • Collected in situ thermoluminescent dosimeter measurements and calculated external dose estimates for radiological releases. • Removed lead bricks as potential source material (PSM) and collected verification samples. • Implemented corrective actions as necessary to protect human health and the environment. • Properly disposed of corrective action and investigation wastes. • Implemented an FFACO use restriction (UR) for radiological contamination at CAS 25-99-21. The approved UR form and map are provided in Appendix F and will be filed in the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Facility Information Management System; the FFACO database; and the NNSA/NSO CAU/CAS files. From November 29, 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: • At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. • At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed low-level radioactive waste. Wastes were disposed of in the appropriate onsite landfills. The NNSA/NSO prov

Mark Kauss

2011-06-01T23:59:59.000Z

348

Corrective Action Decision Document/Closure Report for Corrective Action Unit 569: Area 3 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada with ROTC 1, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 569: Area 3 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 569 comprises the following nine corrective action sites (CASs): • 03-23-09, T-3 Contamination Area • 03-23-10, T-3A Contamination Area • 03-23-11, T-3B Contamination Area • 03-23-12, T-3S Contamination Area • 03-23-13, T-3T Contamination Area • 03-23-14, T-3V Contamination Area • 03-23-15, S-3G Contamination Area • 03-23-16, S-3H Contamination Area • 03-23-21, Pike Contamination Area The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 569 based on the implementation of the corrective actions listed in Table ES-2.

Sloop, Christy

2013-04-01T23:59:59.000Z

349

The function of interpretation as perceived by park visitors and interpreters  

E-Print Network [OSTI]

in the National Park Service was studied by Clark (1949) and in state park systems by Weaver (1952). These writi ngs identify i nterpretati on and nature study as the same activity. Merriam (1972) used the term educat1on synonymously with interpretat1on 1n... to the resource. Due to the nature of the activity, settings of interpreation are often organizationally based, that is, occurring within an organizational jurisdiction, not alone. In this case, one park system was selected for sampling: Texas...

Silvy, Valeen Adams

2012-06-07T23:59:59.000Z

350

WILDLIFE REFUGE BACA NATIONAL  

E-Print Network [OSTI]

Rio Grande National Forest Rio Grande National Forest San Isabel National Forest Solar Energy Study Great Sand Dunes National Preserve 285 160 160 160 285 Carson National Forest Grand Mesa National Forest Note 2) (As of 6/5/2009) Solar Energy Study Area (As of 6/5/2009) BLM Lands Being Analyzed for Solar

Laughlin, Robert B.

351

E-Print Network 3.0 - area-subsurface central nevada Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

California. Unpublished final... report to Sierra Nevada Global Change Program. Sequoia, Kings Canyon, and Yosemite National Parks. Labo... , USA. Journal of Biogeography...

352

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 575: Area 15 Miscellaneous Sites, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 575, Area 15 Miscellaneous Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 575 comprises the following four corrective action sites (CASs) located in Area 15 of the Nevada National Security Site: • 15-19-02, Waste Burial Pit • 15-30-01, Surface Features at Borehole Sites • 15-64-01, Decontamination Area • 15-99-03, Aggregate Plant This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 575 using the SAFER process. Additional information will be obtained by conducting a field investigation to document and verify the adequacy of existing information, to affirm the predicted corrective action decisions, and to provide sufficient data to implement the corrective actions. This will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

Matthews, Patrick

2014-12-01T23:59:59.000Z

353

Groundwater quality monitoring well installation for Waste Area Grouping at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect (OSTI)

This report documents the drilling and installation of 18 groundwater quality monitoring (GQM) wells on the perimeter of Waste Area Grouping (WAG) 11. WAG 11 (White Wing Scrap Yard) is located on the west end of East Fork Ridge between White Wing Road and the Oak Ridge Turnpike. The scrap yard is approximately 25 acres in size. The wells at WAG 11 were drilled and developed between January 1990 and October 1990. These wells were installed to characterize and assess the WAG in accordance with applicable Department of Energy, state, and Environmental Protection Agency regulatory requirements. The wells at WAG 11 were drilled with auger or air rotary rigs. Depending on the hydrogeologic conditions present at each proposed well location, one of four basic installation methods was utilized. Detailed procedures for well construction were specified by the Engineering Division to ensure that the wells would provide water samples representative of the aquifer. To ensure conformance with the specifications, Energy Systems Construction Engineering and ERCE provided continuous oversight of field activities. The purpose of the well installation program was to install GQM wells for groundwater characterization at WAG 11. Data packages produced during installation activities by the ERCE hydrogeologists are an important product of the program. These packages document the well drilling, installation, and development activities and provide valuable data for well sampling and WAG characterization. The forms contained in the packages include predrilling and postdrilling checklists, drilling and construction logs, development and hydraulic conductivity records, and quality control-related documents.

Mortimore, J.A.; Lee, T.A.

1994-09-01T23:59:59.000Z

354

Health and Safety Work Plan for Sampling Colloids in Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

This Work Plan/Site Safety and Health Plan (SSHP) and the attached work plan are for the performance of the colloid project at WAG 5. The work will be conducted by the Oak Ridge National Laboratory (ORNL) Environmental Sciences Division (ESD) and associated ORNL environmental, safety, and health support groups. The purpose of this document is to establish health and safety guidelines to be followed by all personnel involved in conducting work for this project. The levels of protection and the procedures specified in this plan are based on the best information available from historical data and preliminary evaluations of the area. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.

Marsh, J.D.; McCarthy, J.F.

1994-01-01T23:59:59.000Z

355

Environmental, safety, and health plan for the remedial investigation of Waste Area Grouping 10, Operable Unit 3, at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect (OSTI)

This document outlines the environmental, safety, and health (ES&H) approach to be followed for the remedial investigation of Waste Area Grouping (WAG) 10 at Oak at Ridge National Laboratory. This ES&H Plan addresses hazards associated with upcoming Operable Unit 3 field work activities and provides the program elements required to maintain minimal personnel exposures and to reduce the potential for environmental impacts during field operations. The hazards evaluation for WAG 10 is presented in Sect. 3. This section includes the potential radiological, chemical, and physical hazards that may be encountered. Previous sampling results suggest that the primary contaminants of concern will be radiological (cobalt-60, europium-154, americium-241, strontium-90, plutonium-238, plutonium-239, cesium-134, cesium-137, and curium-244). External and internal exposures to radioactive materials will be minimized through engineering controls (e.g., ventilation, containment, isolation) and administrative controls (e.g., procedures, training, postings, protective clothing).

Not Available

1993-10-01T23:59:59.000Z

356

Parking & Transportation Department RESIDENT -PERSONAL INFORMATION  

E-Print Network [OSTI]

Parking & Transportation Department RESIDENT - PERSONAL INFORMATION Date know if you are interested in: Public Transportation Car Pool Van Pool _____________________________________________________________________________________ Please be sure to contact the Parking & Transportation Department with any changes to your information, i

Oliver, Douglas L.

357

The Access Almanac: Solar Parking Requirements  

E-Print Network [OSTI]

spaces be covered with solar panels to meet the increasedone parking space with solar panels will produce about 2who prefer not to install solar panels on their parking lots

Shoup, Donald

2012-01-01T23:59:59.000Z

358

Parking & Transportation Services Sustainability &  

E-Print Network [OSTI]

: 2011 #12;As a long-time leader in the areas of waste abatement, pollution reduction, energy management emissions from automobiles and buses, and reduce fuel consumption. Since the 1980's, PTS has consistently and municipal entities throughout the state. The University of Minnesota Twin Cities campus is the third largest

Minnesota, University of

359

ParkingPermit.docx 11/2/2012 Eligibility for Visitors/Temporary Parking Permits  

E-Print Network [OSTI]

ParkingPermit.docx 11/2/2012 Eligibility for Visitors/Temporary Parking Permits Visitor or Temporary Parking Permits will only be issued based on the following policies: Visitors · Visitors (Non WVU employees) to the Statler College can receive a single day visitor Parking Permit for lots 40, 41, 44

Mohaghegh, Shahab

360

Health assessment for Richardson Flat Tailings, Park City, Summit County, Utah, Region 8. CERCLIS No. UTD980952840. Preliminary report  

SciTech Connect (OSTI)

The Richardson Flat Tailings, an Update 7 site proposed for the National Priorities List, is located 3.5 miles northeast of Park City, Summit County, Utah. From 1975 to 1981, the 160-acre site was used for disposing mine tailing wastes from the Keetly Ontario Mine and other mines owned by United Park City Mines. Currently no tailings are dumped at the site; however, soil from the site is being excavated and used to cover the tailings piles. Several metal contaminants, including arsenic, cadmium, chromium, lead, and zinc, have been detected in on-site and off-site areas. Contaminants may migrate from the site to off-site areas through surface water, groundwater, and airborne-associated pathways. Human exposure to site contaminants may occur through the ingestion of contaminated groundwater, food-chain entities, and soil; through dermal contact with contaminants; and through the inhalation of airborne dusts. The site is considered to be of potential public health concern because of the high levels of on-site contaminants.

Not Available

1990-07-24T23:59:59.000Z

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


361

{00029558 / ver 1 } 1 Parking Regulations  

E-Print Network [OSTI]

on the main and south campuses must have a valid parking permit properly displayed or are required to pay, first served" basis with the required permit (except for spaces specially marked by signage as "reserved"). Possession of a parking permit does not guarantee that a space will be available. Lack of available parking

362

Jackson Park Hospital Green Building Medical Center  

SciTech Connect (OSTI)

Jackson Park Hospital completed the construction of a new Medical Office Building on its campus this spring. The new building construction has adopted the City of Chicago's recent focus on protecting the environment, and conserving energy and resources, with the introduction of green building codes. Located in a poor, inner city neighborhood on the South side of Chicago, Jackson Park Hospital has chosen green building strategies to help make the area a better place to live and work. The new green building houses the hospital's Family Medicine Residency Program and Specialty Medical Offices. The residency program has been vital in attracting new, young physicians to this medically underserved area. The new outpatient center will also help to allure needed medical providers to the community. The facility also has areas designated to women's health and community education. The Community Education Conference Room will provide learning opportunities to area residents. Emphasis will be placed on conserving resources and protecting our environment, as well as providing information on healthcare access and preventive medicine. The new Medical Office Building was constructed with numerous energy saving features. The exterior cladding of the building is an innovative, locally-manufactured precast concrete panel system with integral insulation that achieves an R-value in excess of building code requirements. The roof is a 'green roof' covered by native plantings, lessening the impact solar heat gain on the building, and reducing air conditioning requirements. The windows are low-E, tinted, and insulated to reduce cooling requirements in summer and heating requirements in winter. The main entrance has an air lock to prevent unconditioned air from entering the building and impacting interior air temperatures. Since much of the traffic in and out of the office building comes from the adjacent Jackson Park Hospital, a pedestrian bridge connects the two buildings, further decreasing the amount of unconditioned air that enters the office building. The HVAC system has an Energy Efficiency Rating 29% greater than required. No CFC based refrigerants were used in the HVAC system, thus reducing the emission of compounds that contribute to ozone depletion and global warming. In addition, interior light fixtures employ the latest energy-efficient lamp and ballast technology. Interior lighting throughout the building is operated by sensors that will automatically turn off lights inside a room when the room is unoccupied. The electrical traction elevators use less energy than typical elevators, and they are made of 95% recycled material. Further, locally manufactured products were used throughout, minimizing the amount of energy required to construct this building. The primary objective was to construct a 30,000 square foot medical office building on the Jackson Park Hospital campus that would comply with newly adopted City of Chicago green building codes focusing on protecting the environment and conserving energy and resources. The energy saving systems demonstrate a state of the-art whole-building approach to energy efficient design and construction. The energy efficiency and green aspects of the building contribute to the community by emphasizing the environmental and economic benefits of conserving resources. The building highlights the integration of Chicago's new green building codes into a poor, inner city neighborhood project and it is designed to attract medical providers and physicians to a medically underserved area.

William Dorsey; Nelson Vasquez

2010-03-31T23:59:59.000Z

363

Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

Matthews, Patrick

2013-09-01T23:59:59.000Z

364

Remedial investigation report on Waste Area Grouping 5 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Volume 2 -- Appendix A: Characterization methods and data summary  

SciTech Connect (OSTI)

This document provides the Environmental Restoration Program with information about the results of investigations performed at Waste Area Grouping (WAG) 5. It includes information on risk assessments that have evaluated long-term impacts to human health and the environment. Information provided in this document forms the basis for decisions regarding the need for subsequent remediation work at WAG 5. This appendix presents background regulatory and technical information regarding the solid waste management units (SWMUs) at WAG 5 to address requirements established by the Federal Facility Agreement (FFA) for the Oak Ridge Reservation (ORR). The US Department of Energy (DOE) agreed to conduct remedial investigations (RIs) under the FFA at various sites at Oak Ridge National Laboratory (ORNL), including SWMUs and other areas of concern on WAG 5. The appendix gives an overview of the regulatory background to provide the context in which the WAG 5 RI was planned and implemented and documents how historical sources of data, many of which are SWMU-specific, were evaluated and used.

NONE

1995-09-01T23:59:59.000Z

365

Health and safety plan for the Remedial Investigation and Site Investigation of Waste Area Grouping 2 at the Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect (OSTI)

This health and safety plan (HASP) was developed by the members of the Measurement Applications and Development Group of the Health Science Research Division at the Oak Ridge National Laboratory (ORNL). This plan was prepared to ensure that health and safety related items for the Waste Area Grouping (WAG) 2 Remedial Investigation (RI)/Feasibility Study and Site Investigation projects conform with the requirements of 29 CFR 1910.120 (April 18, 1992). The RI Plan calls for the characterization, monitoring, risk assessment, and identification of remedial needs and alternatives that have been structured and staged with short-term and long-term objectives. In early FY 1992, the WAG 2 RI was integrated with the ORNL Environmental Restoration (ER) Site Investigations program in order to achieve the complimentary objectives of the projects more effectively by providing an integrated basis of support. The combined effort was named the WAG 2 Remedial Investigation and Site Investigations Program (WAG 2 RI&SI). The Site Investigation activities are a series of monitoring efforts and directed investigations that support other ER activities by providing information about (1) watershed hydrogeology; (2) contaminants, pathways, and fluxes for groundwater at ORNL; (3) shallow subsurface areas that can act as secondary sources of contaminants; and (4) biological populations and contaminants in biota, in addition to other support and coordination activities.

Cofer, G.H.; Holt, V.L.; Roupe, G.W.

1993-11-01T23:59:59.000Z

366

University of Campus Parking Garage  

E-Print Network [OSTI]

Garage Uni irchel Parking Garage Urania a1 to Zurich airport / St. Gallen a3W to Chur / lucerne a3 to lucerne a1h to bern / basel #12;Campuses at the University of Zurich University of Zurich rämistrasse 71

Zürich, Universität

367

Vehicle Operation and Parking Policy  

E-Print Network [OSTI]

Vehicle Operation and Parking Policy Responsible Administrative Unit: Finance & Administration in this policy. 2.0 POLICY STATEMENT This policy is intended to promote safe driving by operators of all vehicles are in effect at all times and apply to all persons and vehicles physically present on the CSM campus

368

Vehicle Operation and Parking Policy  

E-Print Network [OSTI]

Vehicle Operation and Parking Policy Responsible Administrative Unit: Finance & Administration STATEMENT This policy is intended to promote safe driving by operators of all vehicles utilizing streets and apply to all persons and vehicles physically present on the CSM campus. For the purpose of this policy

369

Staunton State Park Biological Inventory  

E-Print Network [OSTI]

Staunton State Park Biological Inventory Prepared by: Susan Spackman, David Anderson, Jeremy Biological Inventory Prepared by: Susan Spackman, David Anderson, Jeremy Siemers, Phyllis Pineda, and Jill. The information management staff with CNHP was responsible for integrating the data resulting from the inventory

370

An exploration of the relationship between use of parks and access, park appeal, and communication effectiveness  

E-Print Network [OSTI]

AN EXPLORATION OF THE RELATIONSHIP BETWEEN USE OF PARKS AND ACCESS, PARK APPEAL, AND COMMUNICATION EFFECTIVENESS A Dissertation by JAMIE RAE WALKER Submitted to the Office of Graduate Studies of Texas A&M University in partial... fulfillment of the requirements for the degree of DOCTOR OF PHILOSOPHY December 2008 Major Subject: Recreation, Park and Tourism Sciences AN EXPLORATION OF THE RELATIONSHIP BETWEEN USE OF PARKS AND ACCESS, PARK APPEAL, AND COMMUNICATION...

Walker, Jamie Rae

2009-05-15T23:59:59.000Z

371

Corrective Action Decision Document/Closure Report for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 372, Area 20 Cabriolet/Palanquin Unit Craters, located within Areas 18 and 20 at the Nevada National Security Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 372 comprises four corrective action sites (CASs): • 18-45-02, Little Feller I Surface Crater • 18-45-03, Little Feller II Surface Crater • 20-23-01, U-20k Contamination Area • 20-45-01, U-20L Crater (Cabriolet) The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 372 based on the implementation of the corrective action of closure in place with administrative controls at all CASs. Corrective action investigation (CAI) activities were performed from November 9, 2009, through December 10, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 372 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL was established of 25 millirem per year based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present at all four CASs. It is assumed that radionuclide levels present within the Little Feller I and Cabriolet high contamination areas and within the craters at Palanquin and Cabriolet exceed the FAL. It is also assumed that potential source material in the form of lead bricks at Little Feller I and lead-acid batteries at Palanquin and Cabriolet exceed the FAL. Therefore, corrective actions were undertaken that consist of removing potential source material, where present, and implementing a use restriction and posting warning signs at each CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 372. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 372. • Corrective Action Unit 372 should be moved from Appendix III to Appendix IV of the FFACO.

Matthews, Patrick and Sloop, Christy

2011-04-01T23:59:59.000Z

372

Field sampling and analysis plan for the remedial investigation of Waste Area Grouping 2 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program  

SciTech Connect (OSTI)

This field sampling and analysis (S & A) plan has been developed as part of the Department of Energy`s (DOE`s) remedial investigation (RI) of Waste Area Grouping (WAG) 2 at Oak Ridge National Laboratory (ORNL) located in Oak Ridge, Tennessee. The S & A plan has been written in support of the remedial investigation (RI) plan for WAG 2 (ORNL 1990). WAG 2 consists of White Oak Creek (WOC) and its tributaries downstream of the ORNL main plant area, White Oak Lake (WOL), White Oak Creek embayment (WOCE) on the Clinch River, and the associated floodplain and subsurface environment (Fig. 1.1). The WOC system is the surface drainage for the major ORNL WAGs and has been exposed to a diversity of contaminants from operations and waste disposal activities in the WOC watershed. WAG 2 acts as a conduit through which hydrologic fluxes carry contaminants from upgradient areas to the Clinch River. Water, sediment, soil, and biota in WAG 2 are contaminated and continue to receive contaminants from upgradient WAGs. This document describes the following: an overview of the RI plan, background information for the WAG 2 system, and objectives of the S & A plan; the scope and implementation of the first 2 years of effort of the S & A plan and includes recent information about contaminants of concern, organization of S & A activities, interactions with other programs, and quality assurance specific to the S & A activities; provides details of the field sampling plans for sediment, surface water, groundwater, and biota, respectively; and describes the sample tracking and records management plan.

Boston, H.L.; Ashwood, T.L.; Borders, D.M.; Chidambariah, V.; Downing, D.J.; Fontaine, T.A.; Ketelle, R.H.; Lee, S.Y.; Miller, D.E.; Moore, G.K.; Suter, G.W.; Tardiff, M.F.; Watts, J.A.; Wickliff, D.S.

1992-02-01T23:59:59.000Z

373

E-Print Network 3.0 - alamos national environmental Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

carries out the Trails Management Program Summary: from local citizen hiking groups, Los Alamos County, Forest Service, Park Service, Los Alamos National... stipulated in an NNSA...

374

Assessment of Water Resources and Watershed Conditions in Moores Creek National Battlefield, North Carolina  

E-Print Network [OSTI]

Assessment of Water Resources and Watershed Conditions in Moores Creek National Battlefield, North Assessment of Park Water Resources.......................................................................25 resources........................................................................15 Biological resources

Mallin, Michael

375

Energy Park - SRSCRO  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest Region service area. TheEPSCI Home It is Partnershipsn e r g y F r

376

MYUNGHWAN PARK 6200 Westchester Park Drive, APT 1510, College Park, Maryland 20740  

E-Print Network [OSTI]

RuOx, M. Park Page 1/5 #12;· Developed a low power voltage regulator for energy harvesting power system. · Assisted in integration of the energy harvesting power system of battery, voltage regulator effect of microwave CMOS circuits. · Built numerical and Berkeley Short-channel IGFET(BSIM) model

Lathrop, Daniel P.

377

An evaluation and analysis of the Texas Local Parks, Recreation and Open Space Fund  

E-Print Network [OSTI]

purposes only. Acquisition may include vacant or developed city lots, floodplains, open space/greenways, existing parks, natural areas, water resources, beaches, or other habitats appropriate for almost any outdoor recreational activity. An extensive...AN EVALUATION AND ANALYSIS OF THE TEXAS LOCAL PARKS, RECREATION AND OPEN SPACE FUND A PROFESSIONAL PAPER by Ellen Elaine Dill Submitted to the College of Agriculture and Life Sciences of Texas A!AM University in partial fulfillment...

Dill, Ellen Elaine

2012-06-07T23:59:59.000Z

378

Preliminary engineering report waste area grouping 5, Old Hydrofracture Facility Tanks content removal project, Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

The Superfund Amendments and Reauthorization Act of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires a Federal Facilities Agreement (FFA) for federal facilities placed on the National Priorities List. The Oak Ridge Reservation was placed on that list on December 21, 1989, and the agreement was signed in November 1991 by the U.S. Department of Energy (DOE) Oak Ridge Operations Office, the U.S. Environmental Protection Agency (EPA) Region IV, and the Tennessee Department of Environment and Conservation (TDEC). The effective date of the FFA is January 1, 1992. One objective of the FFA is to ensure that liquid low-level waste (LLLW) tanks that are removed from service are evaluated and remediated through the CERCLA process. Five inactive LLLW tanks, designated T-1, T-2, T-3, T-4, and T-9, located at the Old Hydrofracture (OHF) Facility in the Melton Valley area of Oak Ridge National Laboratory (ORNL) have been evaluated and are now entering the remediation phase. As a precursor to final remediation, this project will remove the current liquid and sludge contents of each of the five tanks (System Requirements Document, Appendix A). It was concluded in the Engineering Evaluation/Cost Analysis [EE/CA] for the Old Hydrofracture Facility Tanks (DOE 1996) that sluicing and pumping the contaminated liquid and sludge from the five OHF tanks was the preferred removal action. Evaluation indicated that this alternative meets the removal action objective and can be effective, implementable, and cost-effective. Sluicing and removing the tank contents was selected because this action uses (1) applicable experience, (2) the latest information about technologies and techniques for removing the wastes from the tanks, and (3) activities that are currently acceptable for storage of transuranic (TRU) mixed waste.

NONE

1996-06-01T23:59:59.000Z

379

Corrective Action Decision Document/Closure Report for Corrective Action Unit 365: Baneberry Contamination Area, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 365 based on the implementation of the corrective action of closure in place with a use restriction (UR). Corrective action investigation (CAI) activities were performed from January 18, 2011, through August 2, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 365 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in supporting the DQO decisions. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present to the southwest of the Baneberry crater. It was also assumed that radionuclide levels present within the crater and fissure exceed the FAL. Corrective actions were undertaken that consisted of establishing a UR and posting warning signs for the crater, fissure, and the area located to the southwest of the crater where soil concentrations exceeded the FAL. These URs were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions beyond what are described in this document are necessary for CAU 365. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 365. (3) Corrective Action Unit 365 should be moved from Appendix III to Appendix IV of the FFACO.

Patrick Matthews

2011-09-01T23:59:59.000Z

380

Corrective Action Decision Document/Closure Report for Corrective Action Unit 106: Area 5, 11 Frenchman Flat Atmospheric Sites, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit 106 comprises four corrective action sites (CASs): (1) 05-20-02, Evaporation Pond; (2) 05-23-05, Atmospheric Test Site - Able; (3) 05-45-04, 306 GZ Rad Contaminated Area; (4) 05-45-05, 307 GZ Rad Contaminated Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 106 based on the implementation of corrective actions. The corrective action of clean closure was implemented at CASs 05-45-04 and 05-45-05, while no corrective action was necessary at CASs 05-20-02 and 05-23-05. Corrective action investigation (CAI) activities were performed from October 20, 2010, through June 1, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (mechanical displacement and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 106 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Industrial Area exposure scenario (2,250 hours of annual exposure). The only radiological dose exceeding the FAL was at CAS 05-45-05 and was associated with potential source material (PSM). It is also assumed that additional PSM in the form of depleted uranium (DU) and DU-contaminated debris at CASs 05-45-04 and 05-45-05 exceed the FAL. Therefore, corrective actions were undertaken at these CASs that consisted of removing PSM and collecting verification samples. Results of verification samples show that remaining soil does not contain contamination exceeding the FALs. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) provides the following recommendations: (1) No further corrective actions are necessary for CAU 106. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 106. (3) Corrective Action Unit 106 should be moved from Appendix III to Appendix IV of the FFACO.

Patrick Matthews and Dawn Peterson

2011-09-01T23:59:59.000Z

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


381

Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

Corrective Action Unit 106 comprises the four corrective action sites (CASs) listed below: • 05-20-02, Evaporation Pond • 05-23-05, Atmospheric Test Site - Able • 05-45-04, 306 GZ Rad Contaminated Area • 05-45-05, 307 GZ Rad Contaminated Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 19, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 106. The presence and nature of contamination at CAU 106 will be evaluated based on information collected from a field investigation. The CAU includes land areas impacted by the release of radionuclides from groundwater pumping during the Radionuclide Migration study program (CAS 05-20-02), a weapons-related airdrop test (CAS 05-23-05), and unknown support activities at two sites (CAS 05-45-04 and CAS 05-45-05). The presence and nature of contamination from surface-deposited radiological contamination from CAS 05-23-05, Atmospheric Test Site - Able, and other types of releases (such as migration and excavation as well as any potential releases discovered during the investigation) from the remaining three CASs will be evaluated using soil samples collected from the locations most likely containing contamination, if present. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 106 includes the following activities: • Conduct radiological surveys. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates and the presence of contaminants of concern. • If contaminants of concern are present, collect additional samples to define the extent of the contamination and determine the area where the total effective dose at the site exceeds final action levels (i.e., corrective action boundary). • Collect samples of investigation-derived waste, as needed, for waste management purposes.

Patrick Matthews

2011-07-01T23:59:59.000Z

382

Environmental Protection Agency Research Triangle Park (RTP) Research Facility  

High Performance Buildings Database

Research Triangle Park, NC The EPA's new RTP campus houses over 2,000 people in 600 laboratory modules--one of the largest multi-disciplinary groups of environmental scientists in the world. The complex includes four 5-story laboratory blocks, three 3-story office blocks, and a 6-story office building that also houses special program areas. The facility design embodies the EPA's environmental ethics.

383

Program Areas | National Security | ORNL  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassive Solar Home DesignPresentationsSRS RespondsLiftPetroleumProfiling clouds'

384

Closure Report for Corrective Action Unit 548: Areas 9, 10, 18, 19, and 20 Housekeeping Sites, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

This Closure Report (CR) documents closure activities for Corrective Action Unit (CAU) 548, Areas 9, 10, 18, 19, and 20 Housekeeping Sites, and complies with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 548 consists of the following Corrective Action Sites (CASs), located in Areas 9, 10, 12, 18, 19, and 20 of the Nevada National Security Site: · CAS 09-99-02, Material Piles (2) · CAS 09-99-04, Wax, Paraffin · CAS 09-99-05, Asbestos, Vermiculite · CAS 09-99-07, Tar Spill · CAS 10-22-02, Drums · CAS 10-22-05, Gas Block · CAS 10-22-07, Gas Block · CAS 10-22-34, Drum · CAS 10-22-38, Drum; Cable · CAS 12-99-04, Epoxy Tar Spill · CAS 12-99-08, Cement Spill · CAS 18-14-01, Transformers (3) · CAS 19-22-01, Drums · CAS 19-22-11, Gas Block (2) · CAS 19-44-01, Fuel Spill · CAS 20-22-07, Drums (2) · CAS 20-22-09, Drums (3) · CAS 20-22-14, Drums (2) · CAS 20-22-16, Drums (2) · CAS 20-24-09, Battery Closure activities began in July 2011 and were completed in December 2011 and included removal and disposal of material piles, spills, sanitary debris, a lead acid battery, lead and steel shot, and stained soil. Activities were conducted according to the Sectored Clean-up Work Plan for Housekeeping Category Waste Sites (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2003). Closure activities generated sanitary waste, hydrocarbon waste, low-level waste, hazardous waste, and mixed waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 548 · The transfer of CAU 548 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO

NSTec Environmental Restoration

2012-08-27T23:59:59.000Z

385

Corrective Action Investigation Plan for Corrective Action Unit 366: Area 11 Plutonium Valley Dispersion Sites, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit 366 comprises the six corrective action sites (CASs) listed below: (1) 11-08-01, Contaminated Waste Dump No.1; (2) 11-08-02, Contaminated Waste Dump No.2; (3) 11-23-01, Radioactively Contaminated Area A; (4) 11-23-02, Radioactively Contaminated Area B; (5) 11-23-03, Radioactively Contaminated Area C; and (6) 11-23-04, Radioactively Contaminated Area D. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed July 6, 2011, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 366. The presence and nature of contamination at CAU 366 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose (TED) at sample locations to the dose-based final action level (FAL). The TED will be calculated by summing the estimates of internal and external dose. Results from the analysis of soil samples collected from sample plots will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at each sample location will be used to measure external radiological dose. Based on historical documentation of the releases associated with the nuclear tests, it was determined that CASs 11-23-02, 11-23-03, and 11-23-04 will be investigated as one release site. The three test areas associated with these CASs are in close proximity; the devices tested were all composed of plutonium and enriched uranium; and the ground zeroes are all posted high contamination areas (HCAs). Because the device tested at CAS 11-23-01 was composed primarily of enriched uranium and the ground zero is not a posted HCA, the CAS will be investigated as a separate release. The DQO process also resulted in an assumption that TED within the HCAs and contaminated waste dumps exceeds the FAL and requires corrective action. A field investigation will be performed to define where TED exceeds the FAL and to determine whether other contaminants of concern are present at the site associated with other activities that took place at the site or from spills or waste discovered during the investigation. The presence and nature of contamination from other types of releases (such as migration and any potential releases discovered during the investigation) will be evaluated using soil samples collected from the locations most likely containing contamination, if present. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.

Patrick Matthews

2011-09-01T23:59:59.000Z

386

Bridgeview Park facility solar retrofit  

SciTech Connect (OSTI)

The weatherization and insulation of a presently unheated frame park building and the installation of a Trombe wall on the south side of the structure for passive solar heating are planned. The major objectives of the project are to increase the exposure of local residents and visitors to passive solar technology and to demonstrate the applicability of passive solar technology to residential, commercial and recreational buildings. Some changes in the original plans are discussed. Five blueprints illustrate the planned improvements. (LEW)

Not Available

1981-01-01T23:59:59.000Z

387

Design report on the test system used to assess treatment of trench water from Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee  

SciTech Connect (OSTI)

New liquid waste streams will be generated as a consequence of closure activities at Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory (ORNL). It is proposed that these waste streams be treated for removal of contaminants by adding them to the ORNL wastewater treatment facilities. Previous bench-scale treatability studies indicate that ORNL treatment operations will adequately remove the contaminants, although additional study is required to characterize the secondary waste materials produced as a result of the treatment. A larger scale treatment system was constructed to produce secondary wastes in the quantities necessary for characterization and US Environmental protection Agency toxicity characteristic leaching procedure (TCLP) testing. The test system is designed to simulate the operation of the ORNL process waste treatment facilities and to treat a mixture of ORNL process wastewater and WAG 6 wastewater at a combined flow rate of 0.5 L/min. The system is designed to produce the necessary quantities of waste sludges and spent carbon for characterization studies and TCLP testing.

Kent, T.E.; Taylor, P.A.

1992-09-01T23:59:59.000Z

388

E-Print Network 3.0 - area southern nevada Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Western Birds 42:226, 2011 elevation ranges of birds on Summary: on data from Sequoia and kings canyon national parks in the southern Sierra nevada and yosemite national... slope...

389

E-Print Network 3.0 - airport parking facilities Sample Search...  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

Occasional Parking n Smart... Way Elite Discount n Visitor Parking n Event Parking n Motorcycle Parking Shuttle Services http:web.mit.edufacilities... ... Source: Leiserson,...

390

PARKING AND TRANSPORTATION ADVISORY COMMITTEE MINUTES May 13, 2014 2:00 PM 206 TAPS  

E-Print Network [OSTI]

and drive area next to the Sigma Nu fraternity house. The proposal included expansion of the Red 1 noted the parking by students has progressively drifted into the wooded area next to the house in the lot or close by Emergency vehicle access #12;2 Water permeation and ecological effects Consultation

Block, Louis

391

Smart Parking Mangement Field Test: A Bay Area Rapid Transit (BART) District Parking Demonstration Final Report  

E-Print Network [OSTI]

and destinations using a grid map. They were then asked towhich they located using a grid map attached to the survey.

Rodier, Caroline J.; Shaheen, Susan; Kemmerer, Charlene

2008-01-01T23:59:59.000Z

392

An Assessment of Bus Rapid Transit Opportunities in the San Francisco Bay Area  

E-Print Network [OSTI]

Monte Rio-Santa Rosa Downtown Sebastopol-Downtown SantaRosa Express Sebastopol AreaLocal Service Sebastopol-Rohnert Park-Sonoma State

Miller, Mark A.; White, Dustin

2004-01-01T23:59:59.000Z

393

E-Print Network 3.0 - area south carolina Sample Search Results  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

A bibliography of floras conducted within the state of North Carolina... conducted in North Carolina cover areas of varying size, from small islands and state parks to...

394

DEPARTMENT OF ENERGY National Electric Transmission Congestion...  

Broader source: Energy.gov (indexed) [DOE]

National Electric Transmission Congestion Report Docket No. 2007-OE-01, Mid-Atlantic Area National Interest Electric Transmission Corridor; Docket No. 2007-0E-02, Southwest Area...

395

City of Ellensburg Renewable Energy Park  

Office of Energy Efficiency and Renewable Energy (EERE)

This presentation was given at the March 19, 2013, CommRE webinar on Renewable Energy Parks by Robert Titus, City of Ellensburg, Washington special projects manager.

396

WIND DATA REPORT Deer Island Parking Lot  

E-Print Network [OSTI]

WIND DATA REPORT Deer Island Parking Lot May 1, 2003 ­ July 15, 2003 Prepared for Massachusetts...................................................................................................................... 7 Wind Speed Time Series............................................................................................................. 7 Wind Speed Distributions

Massachusetts at Amherst, University of

397

University Park Data Dashboard | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

data dashboard for University Park, Maryland, a partner in the Better Buildings Neighborhood Program. bbnpbban0003809pmcdashboardy13-q3.xls More Documents & Publications...

398

Nellis AFB 'Sun Park' Photovoltaic Power Project  

Broader source: Energy.gov (indexed) [DOE]

Briefing is: UNCLASSIFIED Headquarters Air Combat Command Nellis AFB 'Sun Park' Photovoltaic Power Project *Capt Frank Hollifield *AFLOAJACLULT Overview *Objective * Provide...

399

University Park “STEP-UP” Proposal  

Broader source: Energy.gov [DOE]

University Park “STEP-UP” Proposal: DE-FOA-0000148, from the Tool Kit Framework: Small Town University Energy Program (STEP).

400

Low-Energy Parking Structure Design (Brochure)  

SciTech Connect (OSTI)

This guide provides design teams with best practices for parking structure energy efficiency in the form of goals for each design aspect that affects energy use.

Not Available

2013-01-01T23:59:59.000Z

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


401

Parking Infrastructure and the Environment  

E-Print Network [OSTI]

Costs and Benefits of Energy Production and Consumption.Unpriced Consequences of Energy Production and Use, National

Chester, Mikhail; Horvath, Aprad; Madanat, Samer

2011-01-01T23:59:59.000Z

402

New PAD Parking Initiatives Coming in Beginning in March 2010, VAPAHCS will implement several new parking initiatives.  

E-Print Network [OSTI]

registration months once the off-site parking lot is in use. (see map below) Late March ­ VALET PARKING will be sent to all users with an exact start date when contract is finalized. Late March ­ OFF-SITE PARKING AND SHUTTLE SERVICE VAPAHCS is leasing a local, off-site parking lot to make up for parking lots

Puglisi, Joseph

403

Public Park Ecology and Neighborhood Crime: Assessing Resident Perceptions of Crime and Park Quality  

E-Print Network [OSTI]

Public Park Ecology and Neighborhood Crime: Assessing Resident Perceptions of Crime and Park's perceptions of danger [2]. · The Ecology of fear hypothesis suggests that the types and maintenance of park vegetation and landscaping affect both the incidence of crime and public perceptions of it [2]. Analyses

Hall, Sharon J.

404

Effective White Light Options for Parking Area Lighting | Department of  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.Program - LibbyofThisStatement Tuesday,Department of EnergyDepartment

405

Effective White Light Options for Parking Area Lighting  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-UpHeat PumpRecord ofESPC ENABLE: ECM Summary ECMWear | DepartmentDepartment

406

Identification of remediation needs and technology development focus areas for the Environmental Restoration (ER) Project at Sandia National Laboratories/New Mexico (SNL/NM)  

SciTech Connect (OSTI)

The Environmental Restoration (ER) Project has been tasked with the characterization, assessment, remediation and long-term monitoring of contaminated waste sites at Sandia National Laboratories/New Mexico (SNL/NM). Many of these sites will require remediation which will involve the use of baseline technologies, innovative technologies that are currently under development, and new methods which will be developed in the near future. The Technology Applications Program (TAP) supports the ER Project and is responsible for development of new technologies for use at the contaminated waste sites, including technologies that will be used for remediation and restoration of these sites. The purpose of this report is to define the remediation needs of the ER Project and to identify those remediation needs for which the baseline technologies and the current development efforts are inadequate. The area between the remediation needs and the existing baseline/innovative technology base represents a technology gap which must be filled in order to remediate contaminated waste sites at SNL/NM economically and efficiently. In the first part of this report, the remediation needs of the ER Project are defined by both the ER Project task leaders and by TAP personnel. The next section outlines the baseline technologies, including EPA defined Best Demonstrated Available Technologies (BDATs), that are applicable at SNL/NM ER sites. This is followed by recommendations of innovative technologies that are currently being developed that may also be applicable at SNL/NM ER sites. Finally, the gap between the existing baseline/innovative technology base and the remediation needs is identified. This technology gap will help define the future direction of technology development for the ER Project.

Tucker, M.D. [Sandia National Labs., Albuquerque, NM (United States). Site Restoration Technology Program Office; Valdez, J.M.; Khan, M.A. [IT Corp., Albuquerque, NM (United States)

1995-06-01T23:59:59.000Z

407

Results of the radiological survey at 48 Schlosser Drive, Rochelle Park, New Jersey (RJ005)  

SciTech Connect (OSTI)

Maywood Chemical Works (MCW) of Maywood, New Jersey, generated process wastes and residues associated with the production and refining of thorium and thorium compounds from monazite ores from 1916 to 1956.MCW supplied rare earth metals and thorium compounds to the Atomic Energy Commission and various other government agencies from the late 1940s to the mid-1950s. Area residents used the sandlike waste from thisthorium extraction process mixed with tea and cocoa leaves as mulch in their yards. Some of these contaminated wastes were also eroded from the site into Lodi Brook. At the request of the US Department of Energy(DOE), a group from Oak Ridge National Laboratory conducts investigative radiological surveys of properties in the vicinity of MCW to determine whether a property is contaminated with radioactive residues, principally [sup 232]Tb, derived from the MCW site. The survey typically includes direct measurement of gamma radiation levels and soil sampling for radionuclide analyses. The survey of this site, 48 Schlosser Drive, Rochelle Park, New Jersey (RJO05), was conducted on July 14, 1991. Results of the survey demonstrated no radionuclide concentrations in excess of the DOE Formerly Utilized Sites Remedial Action Program criteria. The radionuclide distributions were not significantly different from normal background levels in the northern New Jersey area.

Foley, R.D.; Brown, K.S.

1992-10-01T23:59:59.000Z

408

Results of the radiological survey at 37 Schlosser Drive, Rochelle Park, New Jersey (RJ002)  

SciTech Connect (OSTI)

Maywood Chemical Works (MCW) of Maywood, New Jersey, generated process wastes and residues associated with the production and refining of thorium and thorium compounds from monazite ores from 1916 to 1956. MCW supplied rare earth metals and thorium compounds to the Atomic Energy Commission and various other government agencies from the late 1940s to the mid-1950s. Area residents used the sandlike waste from this thorium extraction process mixed with tea and cocoa leaves as mulch in their yards. Some of these contaminated wastes were also eroded from the site into Lodi Brook. At the request of the US Department of Energy (DOE), a group from Oak Ridge National Laboratory conducts investigative radiological surveys of properties in the vicinity of MCW to determine whether a property is contaminated with radioactive residues, principally [sup 232]Th derived from the MCW site. The survey typically includes direct measurement of gamma radiation levels and soil sampling for radionuclide analyses. The survey of this site, 37 Schlosser Drive, Rochelle Park, New Jersey (RJ002), was conducted on July 14, 1991. Results of the survey demonstrated no radionuclide concentrations in excess of the DOE Formerly Utilized Sites Remedial Action Program criteria. The radionuclide distributions were not significantly different from normal background levels in the northern New Jersey area.

Foley, R.D.; Brown, K.S.

1992-10-01T23:59:59.000Z

409

Results of the radiological survey at 27 Schlosser Drive, Rochelle Park, New Jersey (RJ004)  

SciTech Connect (OSTI)

Maywood Chemical Works (MCW) of Maywood, New Jersey, generated process wastes and residues associated with the production and refining of thorium and thorium compounds from monazite ores from 1916 to 1956. MCW supplied rare earth metals and thorium compounds to the Atomic Energy Commission and various other government agencies from the late 1940s to the mid-1950s. Area residents used the sandlike waste from this thorium extraction process mixed with tea and cocoa leaves as mulch in their yards. Some of these contaminated wastes were also eroded from the site into Lodi Brook. At the request of the US Department of Energy (DOE), a group from Oak Ridge National Laboratory conducts investigative radiological surveys of properties in the vicinity of MCW to determine whether a property is contaminated with radioactive residues, principally {sup 232}Tb, derived from the MCW site. The survey typically includes direct measurement of gamma radiation levels and soil sampling for radionuclide analyses. The survey of this site, 27 Schlosser Drive, Rochelle Park, New Jersey (RJ004), was conducted on July 14, 1991. Results of the survey demonstrated no radionuclide concentrations in excess of the DOE Formerly Utilized Sites Remedial Action Program criteria. The radionuclide distributions were not significantly different from normal background levels in the northern New Jersey area.

Foley, R.D.; Brown, K.S.

1992-10-01T23:59:59.000Z

410

Results of the radiological survey at 37 Schlosser Drive, Rochelle Park, New Jersey (RJ002)  

SciTech Connect (OSTI)

Maywood Chemical Works (MCW) of Maywood, New Jersey, generated process wastes and residues associated with the production and refining of thorium and thorium compounds from monazite ores from 1916 to 1956. MCW supplied rare earth metals and thorium compounds to the Atomic Energy Commission and various other government agencies from the late 1940s to the mid-1950s. Area residents used the sandlike waste from this thorium extraction process mixed with tea and cocoa leaves as mulch in their yards. Some of these contaminated wastes were also eroded from the site into Lodi Brook. At the request of the US Department of Energy (DOE), a group from Oak Ridge National Laboratory conducts investigative radiological surveys of properties in the vicinity of MCW to determine whether a property is contaminated with radioactive residues, principally {sup 232}Th derived from the MCW site. The survey typically includes direct measurement of gamma radiation levels and soil sampling for radionuclide analyses. The survey of this site, 37 Schlosser Drive, Rochelle Park, New Jersey (RJ002), was conducted on July 14, 1991. Results of the survey demonstrated no radionuclide concentrations in excess of the DOE Formerly Utilized Sites Remedial Action Program criteria. The radionuclide distributions were not significantly different from normal background levels in the northern New Jersey area.

Foley, R.D.; Brown, K.S.

1992-10-01T23:59:59.000Z

411

Results of the radiological survey at 48 Schlosser Drive, Rochelle Park, New Jersey (RJ005)  

SciTech Connect (OSTI)

Maywood Chemical Works (MCW) of Maywood, New Jersey, generated process wastes and residues associated with the production and refining of thorium and thorium compounds from monazite ores from 1916 to 1956.MCW supplied rare earth metals and thorium compounds to the Atomic Energy Commission and various other government agencies from the late 1940s to the mid-1950s. Area residents used the sandlike waste from thisthorium extraction process mixed with tea and cocoa leaves as mulch in their yards. Some of these contaminated wastes were also eroded from the site into Lodi Brook. At the request of the US Department of Energy(DOE), a group from Oak Ridge National Laboratory conducts investigative radiological surveys of properties in the vicinity of MCW to determine whether a property is contaminated with radioactive residues, principally {sup 232}Tb, derived from the MCW site. The survey typically includes direct measurement of gamma radiation levels and soil sampling for radionuclide analyses. The survey of this site, 48 Schlosser Drive, Rochelle Park, New Jersey (RJO05), was conducted on July 14, 1991. Results of the survey demonstrated no radionuclide concentrations in excess of the DOE Formerly Utilized Sites Remedial Action Program criteria. The radionuclide distributions were not significantly different from normal background levels in the northern New Jersey area.

Foley, R.D.; Brown, K.S.

1992-10-01T23:59:59.000Z

412

Results of the radiological survey at 27 Schlosser Drive, Rochelle Park, New Jersey (RJ004)  

SciTech Connect (OSTI)

Maywood Chemical Works (MCW) of Maywood, New Jersey, generated process wastes and residues associated with the production and refining of thorium and thorium compounds from monazite ores from 1916 to 1956. MCW supplied rare earth metals and thorium compounds to the Atomic Energy Commission and various other government agencies from the late 1940s to the mid-1950s. Area residents used the sandlike waste from this thorium extraction process mixed with tea and cocoa leaves as mulch in their yards. Some of these contaminated wastes were also eroded from the site into Lodi Brook. At the request of the US Department of Energy (DOE), a group from Oak Ridge National Laboratory conducts investigative radiological surveys of properties in the vicinity of MCW to determine whether a property is contaminated with radioactive residues, principally [sup 232]Tb, derived from the MCW site. The survey typically includes direct measurement of gamma radiation levels and soil sampling for radionuclide analyses. The survey of this site, 27 Schlosser Drive, Rochelle Park, New Jersey (RJ004), was conducted on July 14, 1991. Results of the survey demonstrated no radionuclide concentrations in excess of the DOE Formerly Utilized Sites Remedial Action Program criteria. The radionuclide distributions were not significantly different from normal background levels in the northern New Jersey area.

Foley, R.D.; Brown, K.S.

1992-10-01T23:59:59.000Z

413

Results of the radiological survey at 31 Schlosser Drive, Rochelle Park, New Jersey (RJ003)  

SciTech Connect (OSTI)

Maywood Chemical Works (MCW) of Maywood, New Jersey, generated process wastes and residues associated with the production and refining of thorium and thorium compounds from monazite ores from 1916 to 1956. MCW supplied rare earth metals and thorium compounds to the Atomic Energy Commission and various other government agencies from the late 1940s to the mid-1950s. Area residents used the sandlike waste from this thorium extraction process mixed with tea and cocoa leaves as mulch in their yards. Some of these contaminated wastes were also eroded from the site into Lodi Brook. At the request of the US Department of Energy (DOE), a group from Oak Ridge National Laboratory conducts investigative radiological surveys of properties in the vicinity of MCW to determine whether a property is contaminated with radioactive residues, principally {sup 232}Tb, derived from the MCW site. The survey typically includes direct measurement of gamma radiation levels and soil sampling for radionuclide analyses. The survey of this site, 31 Schlosser Drive, Rochelle Park, New Jersey (RJ003), was conducted on July 14, 1991. Results of the survey demonstrated no radionuclide concentrations in excess of the DOE Formerly Utilized Sites Remedial Action Program criteria. The radionuclide distributions were not significantly different from normal background levels in the northern New Jersey area.

Foley, R.D.; Brown, K.S.

1992-10-01T23:59:59.000Z

414

Results of the radiological survey at 31 Schlosser Drive, Rochelle Park, New Jersey (RJ003)  

SciTech Connect (OSTI)

Maywood Chemical Works (MCW) of Maywood, New Jersey, generated process wastes and residues associated with the production and refining of thorium and thorium compounds from monazite ores from 1916 to 1956. MCW supplied rare earth metals and thorium compounds to the Atomic Energy Commission and various other government agencies from the late 1940s to the mid-1950s. Area residents used the sandlike waste from this thorium extraction process mixed with tea and cocoa leaves as mulch in their yards. Some of these contaminated wastes were also eroded from the site into Lodi Brook. At the request of the US Department of Energy (DOE), a group from Oak Ridge National Laboratory conducts investigative radiological surveys of properties in the vicinity of MCW to determine whether a property is contaminated with radioactive residues, principally [sup 232]Tb, derived from the MCW site. The survey typically includes direct measurement of gamma radiation levels and soil sampling for radionuclide analyses. The survey of this site, 31 Schlosser Drive, Rochelle Park, New Jersey (RJ003), was conducted on July 14, 1991. Results of the survey demonstrated no radionuclide concentrations in excess of the DOE Formerly Utilized Sites Remedial Action Program criteria. The radionuclide distributions were not significantly different from normal background levels in the northern New Jersey area.

Foley, R.D.; Brown, K.S.

1992-10-01T23:59:59.000Z

415

Report: EM Energy Park Initiative  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of Energy Power.pdf11-161-LNG |September 15,2015Department of Energy onACQUISITION ANDEM Energy Park

416

Todd Park | Department of Energy  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomenthe House Committee on EnergyEnergyThe sun rises on theMarch 8,AmandaPark -

417

Herald Square, Greeley Square, Bryant Park [PLACEMARK Award: Hugh Hardy  

E-Print Network [OSTI]

W. Bressi PLACES 14:2 Bryant Park Kiosks, Cafe and Grill Angreatest open space. The Bryant Park Grill and cafe attractwas the restoration of Bryant Park, the largest open space

Bressi, Todd W

2001-01-01T23:59:59.000Z

418

Energy SmartPARKS Retrofitting Parks, Landmarks | Department...  

Broader source: Energy.gov (indexed) [DOE]

home - that example is the prominent Washington Monument, towering up 555 feet from the heart of our nation's capital. An advanced new lighting system for the Washington Monument...

419

UMore Park Update October 2013 UMore Park. The University of Minnesota Outreach, Research and Education (UMore) Park is a 5,000-acre site 25 miles southeast  

E-Print Network [OSTI]

UMore Park Update ­ October 2013 UMore Park. The University of Minnesota Outreach, Research and Education (UMore) Park is a 5,000-acre site 25 miles southeast of the Twin Cities at the suburban presentation set for October 11 The UMore Development LLC will provide an update on UMore Park activities

Amin, S. Massoud

420

Parking  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas Conchas recoveryLaboratorySpeedingOptimizingToolsto controlParc Periodical Parc

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


421

Statistical Sciences Group, Los Alamos National Laboratory,  

E-Print Network [OSTI]

Luke Bornn CCS-6, Statistical Sciences Group, Los Alamos National Laboratory, MS F600, Los Alamos, NM 87545 Charles R. Farrar1 e-mail: farrar@lanl.gov Gyuhae Park Kevin Farinholt The Engineering Institute, Los Alamos National Laboratory, MS T006, Los Alamos, NM 87545 Structural Health Monitoring

Wolfe, Patrick J.

422

Discovery Park Impact Network for Photovoltaic Technology  

E-Print Network [OSTI]

Discovery Park Impact Network for Photovoltaic Technology NEED Discovery Park provides for Photovoltaic Technology (NPT). The NPT is designed to be a unique venue for industry-directed, university aims to become an international center of gravity for photovoltaic research that connects islands

Holland, Jeffrey

423

University of Calgary Motorcycle & Moped parking  

E-Print Network [OSTI]

on 2 or 3 wheels and is powered by an engine or motor. Motor can be gasoline, diesel or electric-3 wheel motor vehicles will be required to purchase a parking pass from Parking and Transportation vehicles being used for commuting. Although we support the sustainable nature of these vehicles

Calgary, University of

424

University of Essex Conference Colchester Wivenhoe Park  

E-Print Network [OSTI]

in the Valley Building adjacent to the Astroturf near the Visitors Car Park, where our team of Receptionists will be happy to assist you. Below is some general information about some of the facilities available on campus in the Valley Building adjacent to the astroturf near the Visitors Car Reception: Park, open daily from 08

Codling, Edward A.

425

University of Calgary Motorcycle & Moped parking  

E-Print Network [OSTI]

University of Calgary Motorcycle & Moped parking (Updated July 10, 2013) As of August 1, 2013 2, safe environment grows with it. The campus has seen a dramatic increase in motorcycle and moped of use: This pass will permit parking of these vehicles in any of the 6 designated motorcycle zones

Habib, Ayman

426

Marine Corps Base Quantico Achieves 85% Savings in Parking Lighting...  

Energy Savers [EERE]

Marine Corps Base Quantico Achieves 85% Savings in Parking Lighting Marine Corps Base Quantico Achieves 85% Savings in Parking Lighting Marine Corps Base Quantico (MCBQ) in...

427

Shoshone Motel & Trailer Park Space Heating Low Temperature Geothermal...  

Open Energy Info (EERE)

Shoshone Motel & Trailer Park Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Shoshone Motel & Trailer Park Space Heating Low Temperature...

428

Agua Calientes Trailer Park Space Heating Low Temperature Geothermal...  

Open Energy Info (EERE)

Calientes Trailer Park Space Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Agua Calientes Trailer Park Space Heating Low Temperature Geothermal...

429

City of Winter Park Energy Conservation Rebate Program (Florida)  

Broader source: Energy.gov [DOE]

The City of Winter Park is now offering rebates to Winter Park electric residential and commercial customers for implementing energy conservation measures.

430

University Park Summary of Reported Data | Department of Energy  

Energy Savers [EERE]

Summary of Reported Data University Park Summary of Reported Data Summary of data reported by Better Buildings Neighborhood Program partner Town of University Park, Maryland....

431

Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit (CAU) 105 is located in Area 2 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 105 is a geographical grouping of sites where there has been a suspected release of contamination associated with atmospheric nuclear testing. This document describes the planned investigation of CAU 105, which comprises the following corrective action sites (CASs): • 02-23-04, Atmospheric Test Site - Whitney • 02-23-05, Atmospheric Test Site T-2A • 02-23-06, Atmospheric Test Site T-2B • 02-23-08, Atmospheric Test Site T-2 • 02-23-09, Atmospheric Test Site - Turk These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 105. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The potential contamination sources associated with all CAU 105 CASs are from atmospheric nuclear testing activities. The presence and nature of contamination at CAU 105 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted after the plan is approved.

Patrick Matthews

2012-09-01T23:59:59.000Z

432

Remediation of Mercury-Contaminated Storm Sewer Sediments from the West End Mercury Area at the Y-12 National Security Complex in Oak Ridge, Tennessee - 12061  

SciTech Connect (OSTI)

The Y-12 National Security Complex in Oak Ridge, TN has faced an ongoing challenge from mercury entrapped in soils beneath and adjacent to buildings, storm sewers, and process pipelines. Previous actions to reduce the quantity and/or mobilization of mercury-contaminated media have included plugging of building floor drains, cleaning of sediment and sludge from sumps, manholes, drain lines, and storm sewers, lining/relining of storm sewers and replacement of a portion of the storm sewer trunk line, re-routing and removal of process piping, and installation of the Central Mercury Treatment System to capture and treat contaminated sump water. Despite the success of these actions, mercury flux in the storm sewer out-falls that discharge to Upper East Fork Poplar Creek (UEFPC) continues to pose a threat to long-term water quality. A video camera survey of the storm sewer network revealed several sections of storm sewer that had large cracks, separations, swells, and accumulations of sediment/sludge and debris. The selected remedy was to clean and line the sections of storm sewer pipe that were determined to be primary contributors to the mercury flux in the storm sewer out-falls. The project, referred to as the West End Mercury Area (WEMA) Storm Sewer Remediation Project, included cleaning sediment and debris from over 2,460 meters of storm sewer pipe followed by the installation of nearly 366 meters of cure-in-place pipe (CIPP) liner. One of the greatest challenges to the success of this project was the high cost of disposal associated with the mercury-contaminated sludge and wastewater generated from the storm sewer cleaning process. A contractor designed and operated an on-site wastewater pre-treatment system that successfully reduced mercury levels in 191 cubic meters of sludge to levels that allowed it to be disposed at Nevada Nuclear Security Site (NNSS) disposal cell as a non-hazardous, low-level waste. The system was also effective at pre-treating over 1,514,000 liters of wastewater to levels that met the waste acceptance criteria for the on-site West End [wastewater] Treatment Facility (WETF). This paper describes the storm sewer cleaning and lining process and the methods used to process the mercury-contaminated sludge and wastewater, as well as several 'lessons learned' that would be relevant to any future projects involving storm sewer cleaning and debris remediation. (authors)

Tremaine, Diana [Science and Ecology Corporation, Knoxville, Tennessee, 37931 (United States); Douglas, Steven G. [B and W Y-12, Oak Ridge, Tennessee, 37831 (United States)

2012-07-01T23:59:59.000Z

433

Corrective Action Investigation Plan for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

CAU 570 comprises the following six corrective action sites (CASs): • 02-23-07, Atmospheric Test Site - Tesla • 09-23-10, Atmospheric Test Site T-9 • 09-23-11, Atmospheric Test Site S-9G • 09-23-14, Atmospheric Test Site - Rushmore • 09-23-15, Eagle Contamination Area • 09-99-01, Atmospheric Test Site B-9A These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 30, 2012, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 570. The site investigation process will also be conducted in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices to be applied to this activity. The presence and nature of contamination at CAU 570 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose at sample locations to the dose-based final action level. The total effective dose will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed near the center of each sample location will be used to measure external radiological dose. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.

Patrick Matthews

2012-08-01T23:59:59.000Z

434

Sustainable Housing for Park Rangers in Big Bend National Park, Texas  

E-Print Network [OSTI]

by substituting fly-ash for 20-30% of the portland cement used in normal concrete. This actually improves the performance and quality of the concrete by improving workability, reducing segregation and bleeding, and lowering the heat hydration. 3. Insulated... Permanent Fiber Cement Wall Forms-"Faswall" use recycled mineralized wood waste along with portland cement to produce a CMU like unit that can be worked with normal wood working tools. The 9" thick form block bonds monolithically with a concrete...

Garrison, M.; Griswold, S.

1996-01-01T23:59:59.000Z

435

Los Alamos National Laboratory Postdoc Career Fair 2014  

E-Print Network [OSTI]

Los Alamos National Laboratory Postdoc Career Fair 2014 Location Information Sessions Research Park TA-03, Bldg 4200 2nd To Crossroads Bible Church 97 East Road Los Alamos, NM From Santa Fe: Take

436

Corrective Action Decision Document/Closure Report for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada National Security Site, Nevada with ROTC 1, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit 374 comprises five corrective action sites (CASs): • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 374 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at CASs 18-23-01 and 20-45-03, and a corrective action of removing potential source material (PSM) was conducted at CAS 20-45-03. The other CASs require no further action; however, best management practices of removing PSM and drums at CAS 18-22-06, and removing drums at CAS 18-22-08 were performed. Corrective action investigation (CAI) activities were performed from May 4 through October 6, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigating the primary release of radionuclides and investigating other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 374 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were found to be present in the surface soil that was sampled. It is assumed that radionuclide levels present in subsurface media within the craters and ejecta fields (default contamination boundaries) at the Danny Boy and Schooner sites exceed the FAL. It is also assumed that PSM in the form of lead-acid batteries at Schooner exceeds the FAL. Therefore, corrective actions were undertaken that consist of removing PSM, where present, and implementing a use restriction and posting warning signs at the Danny Boy and Schooner sites. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 374. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 374. • Corrective Action Unit 374 should be moved from Appendix III to Appendix IV of the FFACO.

Patrick Matthews

2011-07-01T23:59:59.000Z

437

Corrective Action Decision Document/Closure Report for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit 375 comprises three corrective action sites (CASs): (1) 25-23-22, Contaminated Soils Site; (2) 25-34-06, Test Cell A Bunker; and (3) 30-45-01, U-30a, b, c, d, e Craters. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 375 based on the implementation of corrective action of closure in place with administrative controls at CAS 25-23-22, no further action at CAS 25-34-06, and closure in place with administrative controls and removal of potential source material (PSM) at CAS 30-45-01. Corrective action investigation (CAI) activities were performed from July 28, 2010, through April 4, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 375 dataset of investigation results was evaluated based on the data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were assumed to be present within the default contamination boundaries at CASs 25-23-22 and 30-45-01. No contaminants were identified at CAS 25-34-06, and no corrective action is necessary. Potential source material in the form of lead plate, lead-acid batteries, and oil within an abandoned transformer were identified at CAS 30-45-01, and corrective actions were undertaken that consisted of removing the PSM. Use restrictions and warning signs were implemented for the remaining radiological contamination at CASs 25-23-22 and 30-45-01. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions are necessary for CAU 375; (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 375; and (3) Move CAU 375 from Appendix III to Appendix IV of the FFACO.

Patrick Matthews

2011-08-01T23:59:59.000Z

438

Chiltern Woodland Burial Park Chiltern Woodland Burial Park  

E-Print Network [OSTI]

opportunity to restore the brownfield areas and re-establish the ancient semi-natural woodland. Chiltern

439

Laboratory Evaluation of In Situ Chemical Oxidation for Groundwater Remediation, Test Area North, Operable Unit 1-07B, Idaho National Engineering and Environmental Laboratory, Volume Three - Appendix F  

SciTech Connect (OSTI)

This appendix supports the results and discussion of the laboratory work performed to evaluate the feasibility of in situ chemical oxidation for Idaho National Environmental and Engineering Laboratory's (INEEL) Test Area North (TAN) which is contained in ORNL/TM-13711/V1. This volume contains Appendix F. Appendix F is essentially a photocopy of the ORNL researchers' laboratory notebooks from the Environmental Sciences Division (ESD) and the Radioactive Materials Analytical Laboratory (RMAL).

Cline, S.R.; Denton, D.L.; Giaquinto, J.M.; McCracken, M.K.; Starr, R.C.

1999-04-01T23:59:59.000Z

440

Research Areas  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearch Welcome toResearch Areas Our Vision National User Facilities

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


441

Research Areas  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearch Welcome toResearch Areas Our Vision National User

442

Corrective Action Investigation Plan for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

CAU 568 is a grouping of sites where there has been a suspected release of contamination associated with nuclear testing. This document describes the planned investigation of CAU 568, which comprises the following corrective action sites (CASs): • 03-23-17, S-3I Contamination Area • 03-23-19, T-3U Contamination Area • 03-23-20, Otero Contamination Area • 03-23-22, Platypus Contamination Area • 03-23-23, San Juan Contamination Area • 03-23-26, Shrew/Wolverine Contamination Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the investigation report.

Matthews, Patrick

2014-01-01T23:59:59.000Z

443

Soil Resource Inventory of Sequoia National Park, Central Part, California  

E-Print Network [OSTI]

near vicinity of Marble Falls. Sf - Schistose felsenmeer.itself to a point below Marble Falls. Thence, the westernCanyon just south of Marble Falls. Elevations range from

Huntington, Gordon L.; Akeson, Mark A.

1987-01-01T23:59:59.000Z

444

Genetic Analysis of Bull Trout in Glacier National Park  

E-Print Network [OSTI]

communication). A fin clip was taken non-lethally from each individual and stored in 95% ethanol. DNA

445

ORIGINAL ARTICLE [FeFe]-hydrogenase in Yellowstone National Park  

E-Print Network [OSTI]

, MT, USA Hydrogen (H2) has an important role in the anaerobic degradation of organic carbon), hydrothermal vents (Jannasch and Mottl, 1985), salt-evaporation ponds (Hoehler et al., 2001) and a range

446

Desert pavement morphology and dynamics, Big Bend National Park, Texas  

E-Print Network [OSTI]

Desert pavements consist of a one- to two-layer thick surface armory of stones overlying finer, virtually stone-free material which often adopts the appearance of a meticulously tiled mosaic. They cover half of the arid land surface in North America...

Harmon, Courtney Michelle

2009-05-15T23:59:59.000Z

447

Notes and records Reptiles of Katavi National Park, western  

E-Print Network [OSTI]

of Zoology and Wildlife Conservation, University of Dar es Salaam, Tanzania, PO Box 35064, Dar es Salaam

Shaffer, H. Bradley

448

The seasonality of aerosol properties in Big Bend National Park  

E-Print Network [OSTI]

growth cycle present in the daily averaged 32 Day (December 2003) Dp (um) Day (December 2003) Dp (um) Day (January 2004) Dp (um) Day (January 2004) Dp (um) Day (June 2003) Dp (um) Day (June 2003) Dp (um) Day (April 2003) Dp (um) Day (April 2003) Dp... (um) Day (December 2003) Dp (um) Day (December 2003) Dp (um) Day (January 2004) Dp (um) Day (January 2004) Dp (um) Day (June 2003) Dp (um) Day (June 2003) Dp (um) Day (April 2003) Dp (um) Day (April 2003) Dp (um) Fig. 12. Seasonal aerosol number...

Allen, Christopher Lee

2007-04-25T23:59:59.000Z

449

Compound and Elemental Analysis At Lassen Volcanic National Park...  

Open Energy Info (EERE)

sample taken had a pH of 8.35 and contained 2100 ppm Cl and 0.55 ppm NH3. Ratios of Na+K+ and Na+Cl remained nearly constant throughout the flow test. Cation geothermometers...

450

MANHATTAN PROJECT NATIONAL HISTORICAL PARK | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehicles »Exchange Visitorsfor Shade Landscaping forDepartment

451

The Making of a National Park | Department of Energy  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTankless or Demand-Type Water Heaters TanklessDepartmentManhattan

452

Energy Department and National Park Service Announce Clean Cities  

Energy Savers [EERE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy UsageAUDITVehiclesTanklessDOJ TitleDr.Double | Department ofEnergy TrainsEfforts

453

National Parks Clean Up with Alternative Fuels | Department of Energy  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalanced Scorecard Federal2 to:DieselEnergyHydrogen Storage1, 2011 -

454

National Parks Move Forward on Sustainable Transportation in Partnership  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalanced Scorecard Federal2 to:DieselEnergyHydrogen Storage1, 2011 -with Clean

455

Vehicle Technologies Office: AVTA - Evaluating National Parks and Forest  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGYWomen Owned SmallOf The 2012Nuclear GuideReport | Department ofEnergyService Fleets

456

THE LABORATORY Located in Menlo Park, California, SLAC National  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary)morphinanInformation Desert Southwest RegionatSearchScheduled System Burst BufferFluorite TopologyPlasmaTHE

457

Y-12 and the National Park Service study, part  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear SecurityTensile Strain Switched FerromagnetismWaste and MaterialsWenjun1ofRadiative1 Over the years and2Y-12 and the1

458

Data Acquisition-Manipulation At Lassen Volcanic National Park Geothermal  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Office of InspectorConcentratingRenewable Solutions LLC JumpCrow Lake Wind107 CXArea (1982) | Open Energy

459

Sustainable Transportation and National Parks Initiative Featured in  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious RankCombustion |Energy Usage »of Energy Strain Rate4SuperhardSuspect andCoaches AimDepartment ofMagazine

460

Lamar Buffalo Ranch, Yellowstone National Park, Wyoming | Department of  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:Year in3.pdfEnergy Health andofIanJennifer SomersKnownLabor Standards

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


461

Seismicity And Fluid Geochemistry At Lassen Volcanic National Park,  

Open Energy Info (EERE)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data CenterFranconia, Virginia:FAQ < RAPID Jump to:Seadov Pty Ltd Jump to: navigation, search Name: SeadovSedgwick,Hawaii | OpenCalifornia-

462

San Clemente Island, Channel Islands National Park, California | Department  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from the Gridwise Global Forum Round-UpSTATE ENERGYof|Data Dashboard SanDepartment

463

San Miguel Island, Channel Islands National Park, California | Department  

Office of Energy Efficiency and Renewable Energy (EERE) Indexed Site

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE: Alternative Fuels Data Center Home Page on Google Bookmark EERE: Alternative Fuels Data Center Home Page on Delicious Rank EERE:YearRound-Up from the Gridwise Global Forum Round-UpSTATE ENERGYof|Data DashboardCalifornia

464

Lamar Buffalo Ranch, Yellowstone National Park, Wyoming | Department of  

Broader source: Energy.gov (indexed) [DOE]

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "ofEarly Career Scientists'Montana.ProgramJulietipDepartmentJuneWhen IAjaniAs reported inn d e rThe

465

Sandia National Laboratories: Sandia Science & Technology Park  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErikGroundbreaking Work on Criegee Intermediates in Science Magazine&

466

Sandia National Laboratories: Sandia Science and Technology Park  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmosphericNuclear Security Administration the1 -theErikGroundbreaking Work on Criegee Intermediates in Science Magazine&and

467

San Clemente Island, Channel Islands National Park, California | Department  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalancedDepartmentRestrictionsExample Sheet) | Departmentof Energy Clemente

468

San Miguel Island, Channel Islands National Park, California | Department  

Office of Environmental Management (EM)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May Jun Jul(Summary) "of EnergyEnergyENERGY TAXBalancedDepartmentRestrictionsExample Sheet) | Departmentof Energy

469

Alternative Fuels Data Center: Propane Mowers Help National Park Cut  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAbout theOFFICE OFFuels inGoIndianaPennsylvania

470

Alternative Fuels Data Center: Yellowstone National Park Commits to  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAbout theOFFICE OFFuelsPropane TankWashington InformationAlternative

471

Sandia National Laboratories: Sandia Science & Technology Park: Acquisition  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr May JunDatastreamsmmcrcalgovInstrumentsrucLas ConchasPassiveSubmitted for US Patent ClimateECEnergyComputational Modelingof Companies

472

Alternative Fuels Data Center: Mammoth Cave National Park Uses Only  

Broader source: All U.S. Department of Energy (DOE) Office Webpages (Extended Search)

AFDC Printable Version Share this resource Send a link to EERE: Alternative Fuels Data Center Home Page to someone by E-mail Share EERE: Alternative Fuels Data Center Home Page on Facebook Tweet about EERE: Alternative Fuels Data Center Home Page on Twitter Bookmark EERE:1 First Use of Energy for All Purposes (Fuel and Nonfuel),Feet) Year Jan Feb Mar Apr MayAtmospheric Optical Depth (AOD)ProductssondeadjustsondeadjustAbout theOFFICE OFFuels in ItsStationHydrogenNaturalNaturalMaineAlternative

473

OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY  

E-Print Network [OSTI]

1/17/2008 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Hydrologic variability-order forested stream on DOE's Oak Ridge National Environmental Research Park. · Rates of GPP and ER varied-1) 2004 2005 #12;1/17/2008 OAK RIDGE NATIONAL LABORATORY U. S. DEPARTMENT OF ENERGY Investigations

474

Rethinking Biodiversity Conservation Effectiveness and Evaluation in the National Protected Areas Systems of Tropical Islands: The Case of Jamaica and the Dominican Republic.  

E-Print Network [OSTI]

??Island conservation theory and practice with regard to conservation of tropical terrestrial biodiversity in protected areas systems has yet to be adequately addressed in conservation… (more)

Davis, Suzanne Mae Camille

2010-01-01T23:59:59.000Z

475

Corrective Action Decision Document/Closure Report for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

Corrective Action Unit 367 comprises four corrective action sites (CASs): • 10-09-03, Mud Pit • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-45-03, Uncle Crater Site The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation of the corrective actions and site closure activities implemented at CAU 367. A corrective action of closure in place with use restrictions was completed at each of the three crater CASs (10-45-01, 10-45-02, and 10-45-03); corrective actions were not required at CAS 10-09-03. In addition, a limited soil removal corrective action was conducted at the location of a potential source material release. Based on completion of these correction actions, no additional corrective action is required at CAU 367, and site closure is considered complete. Corrective action investigation (CAI) activities were performed from February 2010 through March 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of non-test or other releases (e.g., migration in washes and potential source material). Based on the proximity of the Uncle, Ess, and Sedan craters, the impact of the Sedan test on the fallout deposited from the two earlier tests, and aerial radiological surveys, the CAU 367 investigation was designed to study the releases from the three crater CASs as one combined release (primary release). Corrective Action Site 10-09-03, Mud Pit, consists of two mud pits identified at CAU 367. The mud pits are considered non-test releases or other releases and were investigated independent of the three crater CASs. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 367 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. For the primary release, radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface or shallow subsurface soil outside the default contamination boundary. However, it was assumed that radionuclides are present in subsurface media within each of the three craters (Sedan, Ess, and Uncle) due to prompt injection of radionuclides from the tests. Based on the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consisted of implementing a use restriction and posting warning signs at each crater CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. With regard to other releases, no contaminants of concern were identified at the mud pits or any of the other release locations, with one exception. Potential source material in the form of lead was found at one location. A corrective action of clean closure was implemented at this location, and verification samples indicated that no further action is necessary. Therefore, NNSA/NSO provides the following recommendations: • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 367. • Corrective Action Unit 367 should be promoted from Appendix III to Appendix IV of the FFACO.

Patrick Matthews

2011-06-01T23:59:59.000Z

476

Corrective Action Investigation Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

CAU 104 comprises the 15 CASs listed below: (1) 07-23-03, Atmospheric Test Site T-7C; (2) 07-23-04, Atmospheric Test Site T7-1; (3) 07-23-05, Atmospheric Test Site; (4) 07-23-06, Atmospheric Test Site T7-5a; (5) 07-23-07, Atmospheric Test Site - Dog (T-S); (6) 07-23-08, Atmospheric Test Site - Baker (T-S); (7) 07-23-09, Atmospheric Test Site - Charlie (T-S); (8) 07-23-10, Atmospheric Test Site - Dixie; (9) 07-23-11, Atmospheric Test Site - Dixie; (10) 07-23-12, Atmospheric Test Site - Charlie (Bus); (11) 07-23-13, Atmospheric Test Site - Baker (Buster); (12) 07-23-14, Atmospheric Test Site - Ruth; (13) 07-23-15, Atmospheric Test Site T7-4; (14) 07-23-16, Atmospheric Test Site B7-b; (15) 07-23-17, Atmospheric Test Site - Climax These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on April 28, 2011, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 104. The releases at CAU 104 consist of surface-deposited radionuclides from 30 atmospheric nuclear tests. The presence and nature of contamination at CAU 104 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose (TED) to the dose-based final action level (FAL). The presence of TED exceeding the FAL is considered a radiological contaminant of concern (COC). Anything identified as a COC will require corrective action. The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters will be used to measure external radiological dose. Based on process knowledge of the releases associated with the nuclear tests and radiological survey information about the location and shape of the resulting contamination plume, it was determined that the releases from the nuclear tests are co-located and will be investigated concurrently. A field investigation will be performed to define areas where TED exceeds the FAL and to determine whether other COCs are present at the site. The investigation will also collect information to determine the presence and nature of contamination associated with migration and excavation, as well as any potential releases discovered during the investigation. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS.

Patrick Matthews

2011-08-01T23:59:59.000Z

477

Corrective Action Decision Document for Corrective Action Unit 366: Area 11 Plutonium Valley Dispersion Sites Nevada National Security Site, Nevada, Revision 0  

SciTech Connect (OSTI)

CAU 366 comprises six corrective action sites (CASs): • 11-08-01, Contaminated Waste Dump #1 • 11-08-02, Contaminated Waste Dump #2 • 11-23-01, Radioactively Contaminated Area A • 11-23-02, Radioactively Contaminated Area B • 11-23-03, Radioactively Contaminated Area C • 11-23-04, Radioactively Contaminated Area D The purpose of this CADD is to identify and provide the rationale for the recommendation of corrective action alternatives (CAA) for the six CASs within CAU 366. Corrective action investigation (CAI) activities were performed from October 12, 2011, to May 14, 2012, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 366: Area 11 Plutonium Valley Dispersion Sites.

Patrick Matthews

2012-09-01T23:59:59.000Z

478

Digging the New York City Skyline: Soil Fungal Communities in Green Roofs and City Parks  

E-Print Network [OSTI]

microbes across the greater New York City area is locally variable. Green roof fungal communities wereDigging the New York City Skyline: Soil Fungal Communities in Green Roofs and City Parks Krista L a number of benefits, including decreased urban heat island effects and reduced energy costs for buildings

Fierer, Noah

479

Roadmap: Recreation, Park and Tourism Management Tourism Management Bachelor of Science  

E-Print Network [OSTI]

Roadmap: Recreation, Park and Tourism Management ­ Tourism Management ­ Bachelor of Science [EH to Global Tourism 3 Offered in fall onlyRPTM 26071 Maintenance and Operation of Areas and Facilities 3 HM requirement RPTM 36060 Commercial Recreation and Tourism 3 Offered in fall only RPTM 36040 Inclusion

Sheridan, Scott

480

NATIONAL ENVIRONMENTAL RESEARCH PARKS A National Environmental Research Park is an outdoor laboratory where research may be  

E-Print Network [OSTI]

of the environmental impacts of energy developments, and for informing the public of the environmental and land of research and demonstration programs will be necessary to systematically address the environmental impacts and continuously assess and monitor the environmental impact of human activities, (2) to develop methods

Georgia, University of

Note: This page contains sample records for the topic "national park area" from the National Library of EnergyBeta (NLEBeta).
While these samples are representative of the content of NLEBeta,
they are not comprehensive nor are they the most current set.
We encourage you to perform a real-time search of NLEBeta
to obtain the most current and comprehensive results.


481

Parking Functions And Generalized Catalan Numbers  

E-Print Network [OSTI]

Since their introduction by Konheim and Weiss, parking functions have evolved into objects of surprising combinatorial complexity for their simple definitions. First, we introduce these structures, give a brief history of their development and give...

Schumacher, Paul R.

2010-01-14T23:59:59.000Z

482

UH Parking Access & Mid-Pacific Institute  

E-Print Network [OSTI]

/Staff Housing MAILE W AY FARRINGTON ROAD CAMPUS RO A D ET Dean Hall Hawai`i Hall Crawford Hall Architecture Campus Center CORREA RO A D VISITO R PARKING Jakuan Tea House Thai Pavilion PAMOAROAD Sustainability

483

March 19, 2013 Webinar: Renewable Energy Parks  

Office of Energy Efficiency and Renewable Energy (EERE)

This webinar was held March 19, 2013, and provided information on how two cities in Washington and New York integrated multiple renewable energy technologies to create renewable energy parks in...

484

Urban Parks: Volunteers and Civic Engagement  

E-Print Network [OSTI]

When citizens are engaged with urban park and recreation departments, everyone benefits. This publication describes successful programs that involve community volunteers, and explains what managers can do to engage citizens in such programs....

Schuett, Michael A.

2007-03-02T23:59:59.000Z

485

PARKINGPERMIT STANFORD UNIVERSITY PARKING & TRANSPORTATION SERVICES  

E-Print Network [OSTI]

MC (Motorcycle) Parking space: MC A C Duration Annual (Expires 8/31/14) Academic (Expires 6 date: How many months? Type RESIDENT STUDENT RES (Residential) Residence name: Varsity MC (Motorcycle

486

Post-Closure Evaluation of the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site in Support of the Site-Wide Environmental Impact Statement  

SciTech Connect (OSTI)

The post-closure performance of the Area 3 Radioactive Waste Management Site (RWMS) and Area 5 RWMS are evaluated for the Site-Wide Environmental Impact Statement using current performance assessment and composite analysis methods and models. Two alternatives with different future waste volumes and inventories are evaluated. The No Action Alternative evaluates the inventory disposed through fiscal year (FY) 2010 plus an additional 4.5E5 cubic meters (m3) (1.59E7 cubic feet [ft3]) of waste disposed at the Area 5 RWMS. The Expanded Operations Alternative evaluates the FY 2010 inventory plus an additional 1.42E6 m3 (5.03E7 ft3) of waste disposed at the Area 5 RWMS and 4.93E4 m3 (1.74E6 ft3) disposed at the Area 3 RWMS. Both the No Action and Expanded Operations Alternatives have a reasonable expectation of meeting all performance objectives of U.S. Department of Energy Order DOE O 435.1, “Radioactive Waste Management.” No significant difference between the two alternatives was found because the waste concentrations are similar. The performance assessment model assesses radiological risk for residents at the RWMS boundary where risk is more closely related to waste concentration than total waste inventory. Results for the composite analysis also indicate that the dose constraint and dose limit can be met for both alternatives.

NSTec Environmental Restoration

2011-04-26T23:59:59.000Z

487

The Social Life of Steeplechase Park: Neighborhood Dog-Park as a "Third Place  

E-Print Network [OSTI]

that in the American suburbs, neighborhood parks have the potential to serve as ‘third places.’ The twofold purpose of this research was to examine Steeplechase dog-park using Oldenburg’s Third Place construct as a starting point; and then to operationalize third place...

Gulati, Nidhi 1986-

2012-12-11T23:59:59.000Z

488

Application for Special Use Parking Permit Parking and Transportation Services EMPLOYEES ONLY  

E-Print Network [OSTI]

Application for Special Use Parking Permit Parking and Transportation Services EMPLOYEES ONLY (657 CHAIR/ DIRECTOR NAME CSUF EMAIL ADDRESS DAY PHONE # DEPARTMENT Individual Special Permit Department "Shared Use" Special Permit Please provide a written explanation of the purpose for the Special Use Permit

de Lijser, Peter

489

Overview of The Ariel Sharon (Ayalon) Park PARK ARIEL SHARON TEL AVIV METROPOLITAN GEM  

E-Print Network [OSTI]

recycling and solid waste treatment center, a midsize neighborhood park, and Mikve Israel School's protected lands. At the same time, The District planner, together with public partners- metropolitan recycling team led by Prof. Peter Latz from Munich (Emscher Valley Park designer). At the same time, "reinventing

Sadeh, Norman M.

490

Park Profiler/Jump Analyzer Practical method for determining terrain park jump performance  

E-Print Network [OSTI]

for best practices in terrain park management, design, maintenance, and operations to maximize user. Management II. Planning and Design III. Operations and Maintenance US Terrain Park Council #12;a. start. transition: 1. radial acceleration 1second x v0 above transition d

491

Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada  

SciTech Connect (OSTI)

This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

NSTec Environmental Restoration

2011-02-24T23:59:59.000Z

492

Special Analysis for the Disposal of the Neutron Products Incorporated Sealed Source Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada  

SciTech Connect (OSTI)

The purpose of this special analysis (SA) is to determine if the Neutron Products Incorporated (NPI) Sealed Sources waste stream (DRTK000000056, Revision 0) is suitable for disposal by shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS). The NPI Sealed Sources waste stream consists of 850 60Co sealed sources (Duratek [DRTK] 2013). The NPI Sealed Sources waste stream requires a special analysis (SA) because the waste stream 60Co activity concentration exceeds the Nevada National Security Site (NNSS) Waste Acceptance Criteria (WAC) Action Levels.

Shott, Gregory

2014-08-31T23:59:59.000Z

493

Big George to Carter Mountain 115-kV transmission line project, Park and Hot Springs Counties, Wyoming. Environmental Assessment  

SciTech Connect (OSTI)

The Western Area Power Administration (Western) is proposing to rebuild, operate, and maintain a 115-kilovolt (kV) transmission line between the Big George and Carter Mountain Substations in northwest Wyoming (Park and Hot Springs Counties). This environmental assessment (EA) was prepared in compliance with the National Environmental Policy Act (NEPA) and the regulations of the Council on Environmental Quality (CEQ) and the Department of Energy (DOE). The existing Big George to Carter Mountain 69-kV transmission line was constructed in 1941 by the US Department of Interior, Bureau of Reclamation, with 1/0 copper conductor on wood-pole H-frame structures without an overhead ground wire. The line should be replaced because of the deteriorated condition of the wood-pole H-frame structures. Because the line lacks an overhead ground wire, it is subject to numerous outages caused by lightning. The line will be 54 years old in 1995, which is the target date for line replacement. The normal service life of a wood-pole line is 45 years. Under the No Action Alternative, no new transmission lines would be built in the project area. The existing 69-kV transmission line would continue to operate with routine maintenance, with no provisions made for replacement.

Not Available

1994-02-01T23:59:59.000Z

494

Investigation of Stinson Beach Park storm damage and evaluation of alternative shore protection measures  

SciTech Connect (OSTI)

An investigation was made of storm damage during the winter of 1982-83 to the National Park Service's St